Anda di halaman 1dari 155

REKAPITULASI

RUMAH TINGGAL LANTAI 2


KAB. GOWA

NO URAIAN PEKERJAAN JUMLAH

1 PEKERJAAN PRELIMINARIES Rp 6,126,114.72


2 PEKERJAAN TANAH Rp 46,786,876.18
3 PEKERJAAN STRUKTUR Rp 136,571,296.35
4 PEKERJAAN ARSITEKTUR Rp 219,250,229.87
5 PEKERJAAN MEP Rp 29,757,900.16

JUMLAH Rp 438,492,417.27
SUB TOTAL Rp 438,492,417.27
DIBULATKAN Rp 438,490,000.00
TERBILANG EMPAT RATUS TIGA PULUH DELAPAN JUTA EMPAT RATUS SEMBILAN PULUH RUPIAH
RENCANA ANGGARAN BIAYA

NO. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

I. PEKERJAAN PRELIMINARIES Rp. 6,126,114.72


Rp 6,126,114.72
1. Pembersihan Lokasi Awasl s/d Selesai 128.64 m2 Rp. 18,425.00 Rp. 2,370,192.00
2. Pasangan Bouwplank 48.00 m1 Rp. 78,248.39 Rp. 3,755,922.72
II. PEKERJAAN TANAH Rp. 46,786,876.18

1. Pek. Pondasi Rp. 46,786,876.18


1. Pek. Galian tanah pondasi 66.36 m3 Rp. 82,362.50 Rp. 5,465,921.42
2. Pek. Urugan pasir bawah pondasi 27.65 m3 Rp. 85,217.00 Rp. 2,356,399.18
3. Pas. Batu Kosong/ Aanstamping 4.96 m3 Rp. 494,587.50 Rp. 2,452,021.70
4. Pas. Pondasi batu Kali 35.41 m3 Rp. 966,553.50 Rp. 34,222,551.97
5. Pek. Urugan tanah kembali 38.02 m3 Rp. 60,225.00 Rp. 2,289,981.91
III. PEKERJAAN STRUKTUR Rp. 136,571,296.3

1. Pek. Pondasi Poer Plat 90x90x30cm 7.00 Bh Rp. 9,546,003.34


- Galian tanah Pondasi Poer 6.48 m3 Rp. 82,362.50 Rp. 533,709.00
- Pas. Batu Kosong/ Aanstamping 2.08 m3 Rp. 494,587.50 Rp. 1,028,742.00
- Urugan pasir bawah poer 7.20 m3 Rp. 85,217.00 Rp. 613,562.40
- Urugan kembali bekas galian 2.59 m3 Rp. 60,225.00 Rp. 156,103.20
- Bekisting pile cape 8.89 m2/m3 15.12 m2 Rp. 98,543.50 Rp. 1,489,977.72
- Pembesian pile cape 87.68 kg/m3 149.14 kg Rp. 13,411.38 Rp. 2,000,223.06
- Cor Beton K-250 1.70 m3 Rp. 1,246,698.75 Rp. 2,120,634.57
- Bekisting tie beam 16.00 m2/m3 6.72 m2 Rp. 127,822.75 Rp. 858,968.88
- Pembesian tie beam 39.14 kg/m3 16.44 kg Rp. 13,411.38 Rp. 220,469.03
- Cor Beton K-250 0.42 m3 Rp. 1,246,698.75 Rp. 523,613.48
2. Pek. Sloof Rp. 25,459,222.25
Sloof uk. 15x20 75.62 m1 Rp. 25,459,222.25
- Bekisting 2x pakai 13.33 m2/m3 30.25 m2 Rp. 99,060.50 Rp. 2,996,382.00
- Pembesian 276.19 kg/m3 1,253.14 kg Rp. 13,411.38 Rp. 16,806,318.68
- Cor Beton K - 250 4.54 m3 Rp. 1,246,698.75 Rp. 5,656,521.57

3. Pek. Kolom Rp. 14,069,112.38


Kolom Utama 25x40 Lantai 1 7.0 bh Rp. 3,777,477.03
- Bekisting 2x pakai 16.00 m2/m3 10.1 m2 Rp. 127,822.75 Rp. 1,288,453.32
- Pembesian 55.21 kg/m3 69.6 kg Rp. 13,411.38 Rp. 932,881.81
- Cor Beton K-225 1.26 m3 Rp. 1,235,033.25 Rp. 1,556,141.90

Kolom Utama 25x40 Lantai 2 7.00 bh Rp. 4,002,502.12


- Bekisting 2x pakai 16.00 m2/m3 10.08 m2 Rp. 127,822.75 Rp. 1,288,453.32
- Pembesian 68.52 kg/m3 86.3 kg Rp. 13,411.38 Rp. 1,157,906.91
- Cor Beton K-225 1.26 m3 Rp. 1,235,033.25 Rp. 1,556,141.90

Kolom Praktis 15x15 Lantai 1 15.00 bh Rp. 4,492,467.64


- Bekisting 2x pakai 26.67 m2/m3 13.50 m2 Rp. 127,822.75 Rp. 1,725,607.13
- Pembesian 111.67 kg/m3 113.07 kg Rp. 13,411.38 Rp. 1,516,389.35
- Cor Beton K-225 1.01 m3 Rp. 1,235,033.25 Rp. 1,250,471.17

Kolom Praktis 15x15 Lantai 2 6.00 bh Rp. 1,796,665.59


- Bekisting 2x pakai 26.67 m2/m3 5.40 m2 Rp. 127,822.75 Rp. 690,242.85
- Pembesian 111.61 kg/m3 45.20 kg Rp. 13,411.38 Rp. 606,234.27
- Cor Beton K-225 0.41 m3 Rp. 1,235,033.25 Rp. 500,188.47
4. Pek. Balok Rp. 25,024,226.36
Balok uk. 15x20 cm 31.55 m1 Rp. 7,898,385.39
- Bekisting 2x pakai 15.00 m2/m3 11.83 m2 Rp. 316,954.00 Rp. 3,749,962.01
- Pembesian 103.12 kg/m3 162.68 kg Rp. 13,411.38 Rp. 2,181,756.10
- Cor Beton K - 250 1.58 m3 Rp. 1,246,698.75 Rp. 1,966,667.28

Balok uk. 20x30cm 25.16 m1 Rp. 11,177,533.73


- Bekisting 2x pakai 20.00 m2/m3 20.13 m2 Rp. 316,954.00 Rp. 6,379,650.11
- Pembesian 84.78 kg/m3 170.64 kg Rp. 13,411.38 Rp. 2,288,528.37
- Cor Beton K - 250 2.01 m3 Rp. 1,246,698.75 Rp. 2,509,355.24
Ring Balok uk. 15x20 52.99 m1 Rp. 5,948,307.24
- Bekisting 2x pakai 13.33 m2/m3 10.60 m2 Rp. 316,954.00 Rp. 3,359,078.49
- Pembesian 121.45 kg/m3 193.06 kg Rp. 13,411.38 Rp. 2,589,228.75
- Cor Beton K - 250 1.59 m3 Rp. 1,246,698.75 Rp. 1,981,877.00

5. Pekerjaan Tangga Beton Rp. 10,756,319.76


1. Pondasi Pile Cape 90x90x30 cm 1.00 bh Rp. 1,879,614.60
- Galian tanah 0.72 m3 Rp. 82,362.50 Rp. 59,301.00
- Urugan tanah kembali 1.80 m3 Rp. 60,225.00 Rp. 108,405.00
- Urugan pasir bawah pondasi 0.45 m3 Rp. 85,217.00 Rp. 38,347.65
- Bekisting 3.33 m2/m3 0.81 m2 Rp. 494,587.50 Rp. 400,615.88
- Pembesian 78.91 kg/m3 19.18 kg Rp. 13,411.38 Rp. 257,171.54
- Cor Beton K-250 0.24 m3 Rp. 1,246,698.75 Rp. 302,947.80
- Bekisting tie beam 15.00 m2/m3 2.55 m2 Rp. 98,543.50 Rp. 251,285.93
- Pembesiantie beam 109.48 kg/m3 18.61 kg Rp. 13,411.38 Rp. 249,601.03
- Cor Beton K-250 0.17 m3 Rp. 1,246,698.75 Rp. 211,938.79

2. Plat Tangga Rp. 4,060,822.41


- Bekisting 8.33 m2/m3 4.05 m2 Rp. 632,692.50 Rp. 2,562,404.63
- Pembesian 136.93 kg/m3 66.55 kg Rp. 13,411.38 Rp. 892,522.20
- Cor Beton K-250 0.49 m3 Rp. 1,246,698.75 Rp. 605,895.59

3. Anak Tangga 12.00 bh Rp. 2,707,214.94


- Bekisting 8.33 m2/m3 2.70 m2 Rp. 632,692.50 Rp. 1,708,269.75
- Pembesian 136.93 kg/m3 44.37 kg Rp. 13,411.38 Rp. 595,014.80
- Cor Beton K-250 0.32 m3 Rp. 1,246,698.75 Rp. 403,930.40

4. Balok Bordes 15/40 1.20 m1 Rp. 606,322.46


- Bekisting 20.00 m2/m3 1.44 m2 Rp. 316,954.00 Rp. 456,413.76
- Pembesian 62.29 kg/m3 4.48 kg Rp. 13,411.38 Rp. 60,146.39
- Cor Beton K-250 0.07 m3 Rp. 1,246,698.75 Rp. 89,762.31

5. Plat Bordes 1 Rp. 1,082,885.98


- Bekisting 8.33 m2/m3 1.08 m2 Rp. 632,692.50 Rp. 683,307.90
- Pembesian 136.93 kg/m3 17.75 kg Rp. 13,411.38 Rp. 238,005.92
- Cor Beton K-250 0.13 m3 Rp. 1,246,698.75 Rp. 161,572.16

6. Keramik Rp. 414,618.87


Keramik Anak Tangga + Bordes 1.66 m2 Rp 249,289.85 Rp. 414,618.87

Rp. 4,840.50
7. Relling Tangga 13.83 m1 Taksir 350.00 4,840.500

6. Pekerjaan Plat Lantai 2 Rp. 14,112,234.23


- Bekisting 2x pakai 8.33 m2/m3 13.32 m2 Rp. 318,835.00 Rp. 4,246,882.20
- Pembesian 137.15 kg/m3 438 kg Rp. 13,411.38 Rp. 5,879,905.47
- Cor Beton K - 250 3.20 m3 Rp. 1,246,698.75 Rp. 3,985,446.56

7. Pekerjaan Atap Rp. 26,958,384.54


- Pekerjaan pas kuda-kuda bata merah 30.27 m2 Rp. 126,940.00 Rp. 3,842,727.68
- Pekerjaan Rangka Gording 1.44 m2 Rp. 7,572,562.36 Rp. 10,904,489.80
- Pas. Penutup atap spandek 80.74 m2 Rp. 138,508.33 Rp. 11,183,661.46
- Pas. Listplank Calsiboard 8.00 m1 Rp. 128,438.20 Rp. 1,027,505.60

Pekerjaan Plat Atap 10,645,793.48


- Bekisting 2x pakai 1.43 m2/m3 7.42 m2 Rp. 318,835.00 Rp. 2,364,815.14
- Pembesian 25.97 kg/m3 135 kg Rp. 13,411.38 Rp. 1,808,199.47
- Cor Beton K - 250 5.19 m3 Rp. 1,246,698.75 Rp. 6,472,778.87

IV. PEKERJAAN ARSITEKTUR Rp. 219,250,229.9

1. Pekerjaan Lantai Rp. 36,938,256.49


- Pas. Urugan Pasir Di bawah Lantai t: 10 cm 3.15 m3 Rp. 158,345.00 Rp. 498,470.06
- Pas. Urugan Pasir Di bawah Lantai t: 7 cm 1.45 m3 Rp. 158,345.00 Rp. 229,441.91
- Pas. Urugan Pasir Di bawah Lantai t: 2 cm 0.39 m3 Rp. 158,345.00 Rp. 62,229.59
- Pek. Rabat Beton t: 5 cm 3.00 m2 Rp. 94,949.96 Rp. 285,039.77
- Pas. Tegel Keramik 60x60 53.58 m2 Rp. 429,765.60 Rp. 23,027,786.33
- Pas. Tegel Keramik 40x40 38.11 m2 Rp. 249,289.85 Rp. 9,500,436.06
- Pas. Tegel Keramik 20x20 wc 6.98 m2 Rp. 181,410.68 Rp. 1,265,412.06
- Pas. Tegel Dinding Granit 20x20 wc 15.42 m2 Rp. 181,410.68 Rp. 2,797,352.69
2. Pekerjaan Dinding Rp. 79,757,616.23
- Pas. Dinding Bata merah 1/2 bata (1:4) 243.90 m2 Rp. 11,540.00 Rp. 2,814,629.08
- Pas. Dinding Bata merah 1/2 bata (1:4) (pagar) 37.48 m2 Rp. 126,940.00 Rp. 4,757,711.20
- Pas. Plesteran 1:3 668.36 m2 Rp. 64,283.47 Rp. 42,964,758.48
- Pas. Campuran Trasram 1:2 52.80 m2 Rp. 67,997.03 Rp. 3,590,243.08
- Pas. Acian Tembok 668.36 m2 Rp. 42,559.00 Rp. 28,444,903.48

3. Pekerjaan Kusen Pintu, Jendela dan Ventilasi Rp. 37,136,183.60


- Pas. Kusen Pintu 2 + Jendela 0.07 m3 Rp. 17,469,375.00 Rp. 1,197,525.66
- Pas. Daun Pintu 2 + jendela 2.52 m3 Rp. 827,475.00 Rp. 2,085,237.00
- Kaca 5 mm 0.45 m2 Rp. 358,315.10 Rp. 161,241.80
- Pas.Engsel 6.00 bh Rp. 63,460.10 Rp. 380,760.60
- Pas.Kunci 1.00 bh Rp. 239,151.00 Rp. 239,151.00

- Pas. Kusen Pintu + Jendela 0.12 m3 Rp. 17,469,375.00 Rp. 2,017,712.81


- Pas. Daun Pintu + Jendela 3.78 m3 Rp. 827,475.00 Rp. 3,127,855.50
- Kaca 5 mm 1.36 m2 Rp. 358,315.10 Rp. 487,308.54
- Pas.Engsel 6.00 bh Rp. 63,460.10 Rp. 380,760.60
- Pas.Kunci 2.00 bh Rp. 239,151.00 Rp. 478,302.00

- Pas. Kusen Pintu 0.15 m3 Rp. 17,469,375.00 Rp. 2,672,814.38


- Pas. Daun Pintu 7.56 m3 Rp. 827,475.00 Rp. 6,255,711.00
- Pas.Engsel 12.00 bh Rp. 63,460.10 Rp. 761,521.20
- Pas.Kunci 4.00 bh Rp. 239,151.00 Rp. 956,604.00

- Pas. Pintu Wc pvc crystal elegan coklat 2.00 bh TAKSIR 990,000.00 1,980,000.00

- Pas. Kusen jendela 0.08 m3 Rp. 17,469,375.00 Rp. 1,456,945.88


- Pas. Daun Jendela 0.10 m3 Rp. 655,600.00 Rp. 62,937.60
- Kaca 5 mm 0.92 m2 Rp. 358,315.10 Rp. 331,083.15
- Kaca 5 mm 0.45 m2 Rp. 358,315.10 Rp. 161,241.80
- Pas.Engsel 4.00 bh Rp. 21,000.00 Rp. 84,000.00
- Pas.Kunci 2.00 bh Rp. 150,000.00 Rp. 300,000.00
- Pas.Hak Angin 2.00 bh Rp. 15,700.00 Rp. 31,400.00

- Pas. Kusen jendela dua 0.06 m3 Rp. 17,469,375.00 Rp. 980,031.94


- Pas. Daun Jendela 0.10 m3 Rp. 655,600.00 Rp. 62,937.60
- Kaca 5 mm 0.92 m2 Rp. 358,315.10 Rp. 331,083.15
- Pas.Engsel 6.00 bh Rp. 21,000.00 Rp. 126,000.00
- Pas.Kunci 2.00 bh Rp. 150,000.00 Rp. 300,000.00
- Pas.Hak Angin 2.00 bh Rp. 15,700.00 Rp. 31,400.00

- Pas. Kusen jendela satu 0.03 m3 Rp. 17,469,375.00 Rp. 602,693.44


- Pas. Daun Jendela 0.13 m3 Rp. 17,469,375.00 Rp. 2,236,080.00
- Kaca 5 mm 1.23 m2 Rp. 655,600.00 Rp. 807,699.20
- Pas.Engsel 4.00 bh Rp. 21,000.00 Rp. 84,000.00
- Pas.Kunci 2.00 bh Rp. 150,000.00 Rp. 300,000.00
- Pas.Hak Angin 2.00 bh Rp. 15,700.00 Rp. 31,400.00

- Pas. Kusen ventilasi WC 0.01 m2 Rp. 17,469,375.00 Rp. 235,836.56


- Kaca 5 mm 0.09 m2 Rp. 358,315.10 Rp. 32,248.36

- Pas. Kusen ventilasi type 1 0.02 m2 Rp. 17,469,375.00 Rp. 428,436.42

- Pas. Kusen ventilasi type 2 0.02 m2 Rp. 17,469,375.00 Rp. 352,444.64

- Pas. Kusen ventilasi type 3 0.01 m2 Rp. 17,469,375.00 Rp. 259,420.22

- Pas. Kusen ventilasi type 4 0.02 m2 Rp. 17,469,375.00 Rp. 360,305.86

- Pas. Kusen ventilasi type 5 0.01 m2 Rp. 17,469,375.00 Rp. 131,020.31

- Pas. Kusen ventilasi type 1 0.10 m2 Rp. 17,469,375.00 Rp. 1,671,819.19


- Kaca 5 mm 2.31 m2 Rp. 358,315.10 Rp. 828,424.51

- Pas. Kusen ventilasi type 2 0.05 m2 Rp. 17,469,375.00 Rp. 917,142.19


- Kaca 5 mm 1.16 m2 Rp. 358,315.10 Rp. 415,645.52
4. Pekerjaan Plafond Rp. 14,878,130.32
- Pas. R. Plafond (hollow 20/40 dan 40/40) 62.87 m2 Rp. 154,781.00 Rp. 9,730,926.69
- Pas. Plafond Gypsum Board 62.87 m2 Rp. 56,725.35 Rp. 3,566,266.03
uk. (120x240)cm. tebal 9mm
- Pekerjaan list plafond 70.40 m2 Rp. 22,456.50 1,580,937.60
5. Pekerjaan Pengecatan Rp. 50,540,043.22
- Pengecatan Dinding Luar 593.40 m2 Rp. 43,439.00 Rp. 25,776,876.36
- Pengecatan Dinding Dalam 562.76 m2 Rp. 39,589.00 Rp. 22,279,264.00
- Pengecatan Plafond 62.87 m2 Rp. 39,161.10 Rp. 2,462,019.20
- Pengecatan kusen pj 0.61 m2 Rp. 35,744.50 Rp. 21,883.68

V. PEKERJAAN MEKANIKAL, ELEKTRIKAL, dan PLUMBING (MEP) Rp. 29,757,900.16

1. Pekerjaan Instalasi Listrik Rp. 2,681,706.00


- Pas. Instalasi listrik 30 Bh Rp. 93,518.00 Rp. 2,805,540.00
- Pas. Titik Lampu Philip Down Light 6 Bh Rp. 294,893.50 Rp. 1,769,361.00
- Pas. Titik Lampu Down Light 6 Bh Rp. 294,893.50 Rp. 1,769,361.00
- Pas. Stop Kontak 6 Bh Rp. 59,015.00 Rp. 354,090.00
- Pas. Saklar & stop kontak 3 Bh Rp. 1,450.00 Rp. 4,350.00
- Pas. Saklar Tunggal 6 Bh Rp. 45,550.00 Rp. 273,300.00
- Pas. Saklar Ganda 2 Bh Rp. 90,255.00 Rp. 180,510.00
- Pas. Mcb 1 Bh Rp. 104,445.00 Rp. 104,445.00

2. Pekerjaan Sanitary Rp. 19,791,949.72


- Pas. Closet Duduk 2.00 Bh Rp. 3,253,613.00 Rp. 6,507,226.00
- Pas. Wasthafel 1.00 Bh Rp. 1,973,213.00 Rp. 1,973,213.00
- Pas. Bak Cuci Piring 1.00 Bh Rp. 983,248.75 Rp. 983,248.75
- Pas. Kran Air 4.00 Bh Rp. 110,668.25 Rp. 442,673.00
- Pas. Floor Drain 2.00 Bh Rp. 39,594.50 Rp. 79,189.00
- Pas.Pipa 4'' Air Kotor 11.02 m1 Rp. 99,284.53 Rp. 1,094,115.56
- Pas. Pipa 3" 1/2 Air kotor 20.16 m1 Rp. 99,284.53 Rp. 2,001,576.19
- Pas. Pipa 3/4" Air Bersih 23.27 m1 Rp. 99,284.53 Rp. 2,310,351.09
- Sambungan L '4 Inch 2.00 Bh Rp. 110,045.65 Rp. 220,091.30
- Sambungan L '3 Inch 2.00 Bh Rp. 74,240.65 Rp. 148,481.30
- Sambungan L '3/4 Inch 1.00 Bh Rp. 99,284.53 Rp. 99,284.53
- Tandom Air 3600 L 1.00 Ls Rp. 3,850,000.00 Rp. 3,850,000.00
- Fitting & Alat Bantu 5.00 ls Rp. 16,500.00 Rp. 82,500.00

3. Pekerjaan Septicktank Rp. 6,626,718.38


- Pek. Galian Tanah 7.18 m3 Rp. 82,362.50 Rp. 591,527.48
- Pas. Bata merah 1/2 bata (1:4) 7.35 m2 Rp. 126,940.00 Rp. 933,389.82
- Pas. Plasteran 1:3 14.71 m2 Rp. 64,283.47 Rp. 945,352.74
- Penutup Beton Rp. 4,156,448.35
Bekisting 10 m2/m3 5.04 m2 Rp. 318,835.00 Rp. 1,606,928.40
Pembesian 284.23 kg/m3 143.25 kg Rp. 13,411.38 Rp. 1,921,183.78
Cor Beton K - 250 0.50 m3 Rp. 1,246,698.75 Rp. 628,336.17
4. Pekerjaan Bak Kontrol Rp. 657,526.05
- Pek. Galian Tanah 0.43 m3 Rp. 82,362.50 Rp. 35,111.13
- Pas. Bata merah 1/2 bata (1:4) 2.44 m2 Rp. 126,940.00 Rp. 309,225.84
- Pas. Plasteran 1:3 4.87 m2 Rp. 64,283.47 Rp. 313,189.08
Rp. 438,492,417.27
JUMLAH Rp. 438,492,417.27
ANALISA HARGA SATUAN PEKERJAAN

I PEKERJAAN PRELIMINARIES
Pembersihan Lokasi Awasl s/d Selesai

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA Rp 9,500.00
1 Pekerja OH 0.1000 Rp 95,000.00 Rp 7,250.00
2 Mandor OH 0.0500 Rp 145,000.00 Rp 16,750.00
Jumlah Tenaga Kerja
B. BAHAN Rp -
Jumlah Bahan
C. PERALATAN Rp -
Jumlah Peralatan Rp 16,750.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 1,675.00
E Overhead & Profit 10% X D Rp 18,425.00
F Harga Satuan Pekerjaan ( D + E )
Pengkuran dan pemasangan 1 m' Bouwplank
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 95,000.00 9,500.00
Tukang Kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 23,525.00
B BAHAN
Kayu balok 5/7 kls III m3 0.0120 2,500,000.00 30,000.00
Paku biasa m3 0.0070 15,700.00 109.90
Kayu papan 3/20 m3 0.0070 2,500,000.00 17,500.00
JUMLAH HARGA BAHAN 47,609.90
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 71,134.90


E Overhead & Profit 10.00% 7,113.49
F Harga Satuan Pekerjaaan (D+E) 78,248.39

II PEKERJAAN TANAH
Penggalian 1 m³ tanah biasa sedalam 1 m'
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.75 95,000.00 71,250.00
Mandor L.04 OH 0.03 145,000.00 3,625.00
JUMLAH TENAGA KERJA 74,875.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 74,875.00


E Overhead & Profit 10.00% 7,487.50
F Harga Satuan Pekerjaaan (D+E) 82,362.50
Pengurugan 1 m³ dengan Urugan Pasir Dibawah Lantai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.30 95,000.00 28,500.00
Mandor L.04 OH 0.01 145,000.00 1,450.00
JUMLAH TENAGA KERJA 29,950.00
B BAHAN
Pasir urug m3 1.20 95,000.00 114,000.00
JUMLAH HARGA BAHAN 114,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 143,950.00


E Overhead & Profit 10.00% 14,395.00
F Harga Satuan Pekerjaaan (D+E) 158,345.00
Pengurugan 1 m³ dengan Urugan Pasir Dibawah Batu Kosong
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.30 95,000.00 28,500.00
Mandor L.04 OH 0.01 145,000.00 1,450.00
JUMLAH TENAGA KERJA 29,950.00
B BAHAN
Pasir urug m3 0.43 110,000.00 47,520.00
JUMLAH HARGA BAHAN 47,520.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 77,470.00


E Overhead & Profit 10.00% 7,747.00
F Harga Satuan Pekerjaaan (D+E) 85,217.00
Pemasangan 1 m³ pondasi batu kosong (anstamping)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7800 95,000.00 74,100.00
Tukang batu L.02 OH 0.3900 120,000.00 46,800.00
Kepala Tukang L.03 OH 0.0390 130,000.00 5,070.00
Mandor L.04 OH 0.0390 145,000.00 5,655.00
JUMLAH TENAGA KERJA 131,625.00
B BAHAN
Batu Kali m3 1.2000 265,000.00 318,000.00
JUMLAH HARGA BAHAN 318,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 449,625.00


E Overhead & Profit 10.00% 44,962.50
F Harga Satuan Pekerjaaan (D+E) 494,587.50
Pemasangan 1 m³ pondasi batu belah campuran 1SP:4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 95,000.00 142,500.00
Tukang batu L.02 OH 0.7500 120,000.00 90,000.00
Kepala Tukang L.03 OH 0.0750 130,000.00 9,750.00
Mandor L.04 OH 0.0750 145,000.00 10,875.00
JUMLAH TENAGA KERJA 253,125.00
B BAHAN
Batu Kali m3 1.2000 265,000.00 318,000.00
Semen Portland Kg 163.000 1,520.00 247,760.00
Pasir pasang m3 0.5200 115,000.00 59,800.00
JUMLAH HARGA BAHAN 625,560.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 878,685.00


E Overhead & Profit 10.00% 87,868.50
F Harga Satuan Pekerjaaan (D+E) 966,553.50
Pengurugan kembali 1 m³ galian tanah
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.50 95,000.00 47,500.00
Mandor L.04 OH 0.05 145,000.00 7,250.00
JUMLAH TENAGA KERJA 54,750.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 54,750.00


E Overhead & Profit 10.00% 5,475.00
F Harga Satuan Pekerjaaan (D+E) 60,225.00
Pengurugan 1 m³ dengan tanah urug
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.30 95,000.00 28,500.00
Mandor L.04 OH 0.01 145,000.00 1,450.00
JUMLAH TENAGA KERJA 29,950.00
B BAHAN
Tanah Timbunan m3 1.20 100,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN
Bulldozer D65 Jam 0.0139 500,000.00 6,944.44
Vibratory Roller Jam 0.0104 300,000.00 3,125.00
Water Tanker Jam 0.0219 275,000.00 6,015.63
Alat Bantu Jam 1.0000 5,000.00 5,000.00
JUMLAH HARGA ALAT 21,085.07

D Jumlah (A+B+C) 171,035.07


E Overhead & Profit 10.00% 17,103.51
F Harga Satuan Pekerjaaan (D+E) 188,138.58
III PEKERJAAN STRUKTUR
Pembesian 1 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 95,000.00 6,650.00
Tukang besi L.02 OH 0.0700 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.0070 130,000.00 910.00
Mandor L.04 OH 0.0040 145,000.00 580.00
JUMLAH TENAGA KERJA 16,540.00
B BAHAN
Besi beton (polos/ulir) Kg 10.5000 9,460.00 99,330.00
Kawat beton Kg 0.1500 20,900.00 3,135.00
JUMLAH HARGA BAHAN 102,465.00
C PERALATAN
Katrol electrik Jam 0.12 25,000.00 2,916.67
JUMLAH HARGA ALAT 2,916.67

D Jumlah (A+B+C) 121,921.67


E Overhead & Profit 10.00% 12,192.17
F Harga Satuan Pekerjaaan (D+E) 134,113.83
G Harga Satuan untuk 1 kg 13,411.38
Membuat 1 m³ beton mutu f' = 21,7 Mpa (K 250), slump (12 ±2) cm, w/c = 0,56
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 95,000.00 156,750.00
Tukang batu L.02 OH 0.2750 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.0280 130,000.00 3,640.00
Mandor L.04 OH 0.0830 145,000.00 12,035.00
JUMLAH TENAGA KERJA 205,425.00
B BAHAN
Ready mix K-250 m3 1.0100 918,750.00 927,937.50
JUMLAH HARGA BAHAN 927,937.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,133,362.50


E Overhead & Profit 10.00% 113,336.25
F Harga Satuan Pekerjaaan (D+E) 1,246,698.75
Membuat 1 m³ beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 95,000.00 156,750.00
Tukang batu L.02 OH 0.2750 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.0280 130,000.00 3,640.00
Mandor L.04 OH 0.0830 145,000.00 12,035.00
JUMLAH TENAGA KERJA 205,425.00
B BAHAN
Ready mix K-225 m3 1.0100 908,250.00 917,332.50
JUMLAH HARGA BAHAN 917,332.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,122,757.50


E Overhead & Profit 10.00% 112,275.75
F Harga Satuan Pekerjaaan (D+E) 1,235,033.25
Pemasangan 1 m² bekisting untuk pondasi
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 95,000.00 49,400.00
Tukang Kayu L.02 OH 0.2600 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.0260 130,000.00 3,380.00
Mandor L.04 OH 0.0260 145,000.00 3,770.00
JUMLAH TENAGA KERJA 87,750.00
B BAHAN
Kayu kelas III m3 0.0400 2,500,000.00 100,000.00
Paku 5 - 10 cm Kg 0.3000 20,900.00 6,270.00
Minyak bekisting Ltr 0.1000 5000 500.00
JUMLAH HARGA BAHAN 106,770.00
C PERALATAN

JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 199,520


E Overhead & Profit 10.00% 19,952.00
F Harga Satuan Pekerjaaan (D+E) 219,472
G Untuk 2x pakai (A+1/2B+C) 89,585.00
H Overhead & Profit 10.00% 8,958.50
I Harga Satuan Pekerjaaan (D+E) 98,543.50
Pemasangan 1 m² bekisting untuk sloof
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 95,000.00 49,400.00
Tukang Kayu L.02 OH 0.2600 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.0260 130,000.00 3,380.00
Mandor L.04 OH 0.0260 145,000.00 3,770.00
JUMLAH TENAGA KERJA 87,750.00
B BAHAN
Kayu kelas III m3 0.0450 2,500,000.00 112,500.00
Paku 5 - 10 cm Kg 0.3000 15,700.00 4,710.00
Minyak bekisting Ltr 0.1000 5,000.00 500.00
JUMLAH HARGA BAHAN 117,710.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 205,460.00


E Overhead & Profit 10.00% 20,546.00
F Harga Satuan Pekerjaaan (D+E) 226,006.00
G Untuk 2x pakai (A+1/2B+C) 90,055.00
H Overhead & Profit 10.00% 9,005.50
I Harga Satuan Pekerjaaan (D+E) 99,060.50
Pemasangan 1 m² bekisting untuk lantai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 95,000.00 62,700.00
Tukang Kayu L.02 OH 0.3300 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.0330 130,000.00 4,290.00
Mandor L.04 OH 0.0330 145,000.00 4,785.00
JUMLAH TENAGA KERJA 111,375.00
B BAHAN
Paku 5 - 10 cm Kg 0.4000 23,000.00 9,200.00
Minyak bekisting Ltr 0.2000 7,500.00 1,500.00
Balok kayu kelas II m3 0.0550 3,150,000.00 173,250.00
Plywood tebal 9 mm Lbr 0.3500 130,000.00 45,500.00
Scafholding set/bln 1.5000 85,000 127,500.00
JUMLAH HARGA BAHAN 356,950.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 468,325.00


E Overhead & Profit 10.00% 46,832.50
F Harga Satuan Pekerjaaan (D+E) 515,157.50
G Untuk 2x pakai (A+1/2B+C) 289,850.00
H Overhead & Profit 10.00% 28,985.00
I Harga Satuan Pekerjaaan (D+E) 318,835.00
Memasang Bekisting Untuk Tangga M2
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6600 Rp 95,000.00 Rp 62,700.00
2 Tukang OH 0.3300 Rp 120,000.00 Rp 39,600.00
3 Kepala Tukang OH 0.0330 Rp 130,000.00 Rp 4,290.00
4 Mandor OH 0.0330 Rp 145,000.00 Rp 4,785.00
Jumlah Tenaga Kerja Rp 111,375.00
B. BAHAN
1 Kayu Kelas III M3 0.0300 Rp 3,900,000 Rp 117,000.00
2 Paku 5cm-10cm kg 0.4000 Rp 23,000 Rp 9,200.00
3 Minyak Bekisting Liter 0.2000 Rp 8,000 Rp 1,600.00
4 Balok kayu kelas II m3 0.0200 Rp 3,150,000 Rp 63,000.00
5 Plywood Tebal 9 mm Lbr 0.3500 130,000.00 Rp 63,000.00
6 Kayu dolken dia.8-10 cm, L 4 m Batang 3.0000 Rp 70,000 Rp 210,000.00
Jumlah Bahan Rp 463,800
C. PERALATAN
Jumlah Peralatan Rp 575,175
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 575,175.0
E Overhead & Profit 10% X D Rp 57,517.50
F Harga Satuan Pekerjaan ( D + E ) Rp 632,693
Pemasangan 1 m² bekisting untuk kolom
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 95,000.00 62,700.00
Tukang Kayu L.02 OH 0.3300 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.0330 130,000.00 4,290.00
Mandor L.04 OH 0.0330 145,000.00 4,785.00
JUMLAH TENAGA KERJA 111,375.00
B BAHAN
Paku 5 - 10 cm Kg 0.4000 15,700.00 6,280.00
Minyak bekisting Ltr 0.2000 5,000.00 1,000.00
Balok kayu kelas II m3 0.0150 3,150,000.00 47,250.00
Plywood tebal 9 mm Lbr 0.3500 130,000.00 45,500.00
Pipa dan jack base set/bln 2.8000 7,500.00 21,000.00
JUMLAH HARGA BAHAN 121,030.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 232,405.00


E Overhead & Profit 10.00% 23,240.50
F Harga Satuan Pekerjaaan (D+E) 255,645.50
G Untuk 2x pakai (A+1/2B+C) 171,890.00
H Overhead & Profit 10.00% 17,189.00
I Harga Satuan Pekerjaaan (D+E) 189,079.00
G Harga Satuan untuk 2 kali pakai 127,822.75
Pemasangan 1 m² bekisting untuk balok
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 95,000.00 62,700.00
Tukang Kayu L.02 OH 0.3300 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.0330 130,000.00 4,290.00
Mandor L.04 OH 0.0330 145,000.00 4,785.00
JUMLAH TENAGA KERJA 111,375.00
B BAHAN
Paku 5 - 10 cm Kg 0.4000 15,700.00 6,280.00
Minyak bekisting Ltr 0.2000 5,000.00 1,000.00
Balok kayu kelas II m3 0.0550 3,150,000.00 173,250.00
Plywood tebal 9 mm Lbr 0.3500 130,000.00 45,500.00
Scafholding lengkap set/bln 1.5000 85,000.00 127,500.00
JUMLAH HARGA BAHAN 353,530.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 464,905.00


E Overhead & Profit 10.00% 46,490.50
F Harga Satuan Pekerjaaan (D+E) 511,395.50
G Untuk 2x pakai (A+1/2B+C) 288,140.00
H Overhead & Profit 10.00% 28,814.00
I Harga Satuan Pekerjaaan (D+E) 316,954.00
Pemasangan M2 kg jaring kawat baja (wiremesh)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 95,000.00 2,375.00
Tukang besi L.02 OH 0.0250 120,000.00 3,000.00
Kepala Tukang L.03 OH 0.0250 130,000.00 3,250.00
Mandor L.04 OH 0.0010 145,000.00 145.00
JUMLAH TENAGA KERJA 8,770.00
B BAHAN
Wire mesh M-8 M2 1.0000 165,000.00 165,000.00
Kawat beton Kg 0.0500 20,900.00 1,045.00
JUMLAH HARGA BAHAN 166,045.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 174,815.00


E Overhead & Profit 10.00% 17,481.50
F Harga Satuan Pekerjaaan (D+E) 192,296.50
Membuat 1 m2 Rabat beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58 t = 5cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2857 95,000.00 27,142.86
Tukang batu L.02 OH 0.0714 120,000.00 8,571.43
Kepala Tukang L.03 OH 0.0071 130,000.00 928.57
Mandor L.04 OH 0.0143 145,000.00 2,071.43
JUMLAH TENAGA KERJA 38,714.29
B BAHAN
Semen portland Kg 9.2821 1,520.00 14,108.86
Pasir beton Kg 54.0000 115.00 6,210.00
Kerikil (Maks. 30 mm) Kg 87.7500 265.00 23,253.75
Air Ltr 16.1250 250.00 4,031.25
JUMLAH HARGA BAHAN 47,603.86
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 86,318.14


E Overhead & Profit 10.00% 8,631.81
F Harga Satuan Pekerjaaan (D+E) 94,949.96
Pemasangan Rangka Atap Baja Ringan
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.4000 95,000.00 38,000.00
Tukang besi L.02 OH 0.4000 120,000.00 48,000.00
Kepala tukang L.03 OH 0.1050 130,000.00 13,650.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 100,375.00
B BAHAN
Profil C 75. 100 M2 0.720 20,000.00 14,400.00
Profil C 75. 75 M2 0.620 15,250.00 9,455.00
Profil U 50.60.100 M2 1.740 35,000.00 60,900.00
Profil U 35.30.40 M2 0.290 17,500.00 5,075.00
Screw Kuda-kuda 12-14x40 Bh 5.000 1,000.00 5,000.00
Screw Reng 10-16x16 Bh 5.000 1,000.00 5,000.00
JUMLAH HARGA BAHAN 99,830.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 200,205.00


E Overhead & Profit 10.00% 20,020.50
F Harga Satuan Pekerjaaan (D+E) 220,225.50
Pemasangan 1 m² atap spandeks t = 0,4mm coated
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.1200 95,000.00 11,400.00
Tukang kayu L.02 OH 0.0600 120,000.00 7,200.00
Kepala tukang L.03 OH 0.0060 130,000.00 780.00
Mandor L.04 OH 0.0060 145,000.00 870.00
JUMLAH TENAGA KERJA 20,250.00
B BAHAN
Spandeks t = 0,4mm m2 1.6667 58,000.00 96,666.67
Steping screw bh 9.0000 1,000.00 9,000.00
JUMLAH HARGA BAHAN 105,666.67
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 125,916.67


E Overhead & Profit 10.00% 12,591.67
F Harga Satuan Pekerjaaan (D+E) 138,508.33
Memasang Atap Seng Genteng M2
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.2000 Rp 95,000.00 Rp 19,000.00
2 Tukang OH 0.1000 Rp 11,400.00 Rp 1,140.00
3 Kepala Tukang OH 0.0100 Rp 7,200.00 Rp 72.00
4 Mandor OH 0.0010 Rp 780.00 Rp 0.78
Jumlah Tenaga Kerja Rp 20,212.78
B. BAHAN
1 Atap Seng Genteng Lbr 1.0500 Rp 45,000.00 Rp 47,250.00
2 Paku Seng Kg 0.2000 Rp 20,000.00 Rp 4,000.00
Jumlah Bahan Rp 51,250.00
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 71,462.78
E Overhead & Profit 0% X D Rp -
F Harga Satuan Pekerjaan ( D + E ) Rp 71,462.78
Memasang Konstruksi Kuda-Kuda, Kayu Kelas I M3
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 6.7000 Rp 95,000.00 Rp 636,500.00
2 Tukang OH 20.1000 Rp 11,400.00 Rp 229,140.00
3 Kepala Tukang OH 2.0100 Rp 7,200.00 Rp 14,472.00
4 Mandor OH 0.3350 Rp 780.00 Rp 261.30
Jumlah Tenaga Kerja Rp 880,373.30
B. BAHAN
1 Balok Kayu Kelas I M3 1.200 Rp 5,500,000.00 Rp 6,600,000.00
2 Besi Strip Tebal 5 mm Kg 15.000 Rp 33,858.00 Rp 507,870.00
3 Paku Kayu Kg 5.600 Rp 18,000.00 Rp 100,800.00
Jumlah Bahan Rp 7,208,670
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 8,089,043
E Overhead & Profit 0% X D Rp -
F Harga Satuan Pekerjaan ( D + E ) Rp 8,089,043
Memasang Konstruksi gording, Kayu Kelas II M3
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 2.4000 Rp 95,000.00 Rp 228,000.00
2 Tukang OH 7.2000 Rp 120,000.00 Rp 864,000.00
3 Kepala Tukang OH 0.7200 Rp 7,200.00 Rp 5,184.00
4 Mandor OH 0.1200 Rp 780.00 Rp 93.60
Jumlah Tenaga Kerja Rp 1,097,277.60
B. BAHAN
1 Balok Kayu Kelas II M3 1.1000 Rp 4,750,000.00 Rp 5,225,000.00
2 Besi Strip Tebal 5 mm Kg 15.0000 Rp 33,858.00 Rp 507,870.00
3 Paku Kayu Kg 3.0000 Rp 18,000.00 Rp 54,000.00
Jumlah Bahan Rp 5,786,870
C. PERALATAN
Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 6,884,148
E Overhead & Profit 10% X D Rp 688,414.76
F Harga Satuan Pekerjaan ( D + E ) Rp 7,572,562
Memasang Calsiboard M2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.1000 95,000.00 9,500.00
Tukang kayu L.02 OH 0.2000 120,000.00 24,000.00
JUMLAH TENAGA KERJA 33,500.00
B BAHAN
Calsiboard m1 1.1000 61,420.00 67,562.00
Paku Biasa kg 1.0000 15,700.00 15,700.00
JUMLAH HARGA BAHAN 83,262.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 116,762.00


E Overhead & Profit 10.00% 11,676.20
F Harga Satuan Pekerjaaan (D+E) 128,438.20
Pemasangan 1 m² lantai Granit 60 x 60cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.7000 95,000.00 66,500.00
Tukang batu L.02 OH 0.3500 120,000.00 42,000.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0350 145,000.00 5,075.00
JUMLAH TENAGA KERJA 118,125.00
B BAHAN
Granit 60x60 bh 2.7778 90,000.00 250,000.00
Semen portland kg 9.8000 1,520.00 14,896.00
Pasir pasang m3 0.0450 115,000.00 5,175.00
JUMLAH HARGA BAHAN 270,071.00
C PERALATAN
Alat pemotong ls 1.000 2500 2,500.00
JUMLAH HARGA ALAT 2,500.00

D Jumlah (A+B+C) 390,696.00


E Overhead & Profit 10.00% 39,069.60
F Harga Satuan Pekerjaaan (D+E) 429,765.60
Pemasangan 1 m² lantai Keramik ukuran 20x20cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.7000 95,000.00 66,500.00
Tukang batu L.02 OH 0.3500 120,000.00 42,000.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0350 145,000.00 5,075.00
JUMLAH TENAGA KERJA 118,125.00
B BAHAN
Keramik 20x25 bh 6.2500 2,960.00 18,500.00
Semen portland kg 8.1900 1,520.00 12,448.80
Semen warna kg 1.6200 3,500.00 5,670.00
Pasir pasang m3 0.0450 115,000.00 5,175.00
JUMLAH HARGA BAHAN 41,793.80
C PERALATAN
Alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 164,918.80


E Overhead & Profit 10.00% 16,491.88
F Harga Satuan Pekerjaaan (D+E) 181,410.68
Pemasangan 1 m² lantai Keramik ukuran 40x40cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.7000 95,000.00 66,500.00
Tukang batu L.02 OH 0.3500 120,000.00 42,000.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0350 145,000.00 5,075.00
JUMLAH TENAGA KERJA 118,125.00
B BAHAN
Keramik 40x40 bh 6.2500 12,833.33 80,208.33
Semen portland kg 8.1900 1,520.00 12,448.80
Semen warna kg 1.6200 3,500.00 5,670.00
Pasir pasang m3 0.0450 115,000.00 5,175.00
JUMLAH HARGA BAHAN 103,502.13
C PERALATAN
Alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 226,627.13


E Overhead & Profit 10.00% 22,662.71
F Harga Satuan Pekerjaaan (D+E) 249,289.85
Pemasangan 1 m² dinding Keramik 40x40cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.9000 95,000.00 85,500.00
Tukang batu L.02 OH 0.4500 120,000.00 54,000.00
Kepala tukang L.03 OH 0.0450 130,000.00 5,850.00
Mandor L.04 OH 0.0450 145,000.00 6,525.00
JUMLAH TENAGA KERJA 151,875.00
B BAHAN
Porslen bh 6.2500 12,833.33 80,208.33
Semen portland kg 9.3000 1,520.00 14,136.00
Semen warna kg 1.9400 3,500.00 6,790.00
Pasir pasang m3 0.0180 115,000.00 2,070.00
JUMLAH HARGA BAHAN 103,204.33
C PERALATAN
alat bantu 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 260,079.33


E Overhead & Profit 10.00% 26,007.93
F Harga Satuan Pekerjaaan (D+E) 286,087.27
Pemasangan 1 m' plint granit tile 10x60cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0900 95,000.00 8,550.00
Tukang batu L.02 OH 0.0900 120,000.00 10,800.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 24,625.00
B BAHAN
Keramik 10/60 m' 1.6667 15,000.00 25,000.00
Semen portland kg 12.4400 1,520.00 18,908.80
Semen warna kg 0.6500 3,500.00 2,275.00
Pasir pasang m3 0.0250 115,000.00 2,875.00
Paku 12cm bh 3.0300 150.00 454.50
JUMLAH HARGA BAHAN 49,513.30
C PERALATAN
alat bantu ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 79,138.30


E Overhead & Profit 10.00% 7,913.83
F Harga Satuan Pekerjaaan (D+E) 87,052.13
Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP:4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3000 95,000.00 28,500.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0150 145,000.00 2,175.00
JUMLAH TENAGA KERJA 43,975.00
B BAHAN
Bata merah bh 70.0000 700.00 49,000.00
Semen portland kg 11.5000 1,520.00 17,480.00
Pasir pasang m3 0.0430 115,000.00 4,945.00
JUMLAH HARGA BAHAN 71,425.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 115,400.00


E Overhead & Profit 10.00% 11,540.00
F Harga Satuan Pekerjaaan (D+E) 126,940.00
Pemasangan 1 m² plesteran 1SP:3PP tebal 15mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3000 95,000.00 28,500.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0150 145,000.00 2,175.00
JUMLAH TENAGA KERJA 43,975.00
B BAHAN
Semen portland kg 7.7760 1,520.00 11,819.52
Pasir pasang m3 0.0230 115,000.00 2,645.00
JUMLAH HARGA BAHAN 14,464.52
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,439.52


E Overhead & Profit 10.00% 5,843.95
F Harga Satuan Pekerjaaan (D+E) 64,283.47
Pemasangan 1 m² plesteran 1SP:2PP tebal 15mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3000 95,000.00 28,500.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0150 145,000.00 2,175.00
JUMLAH TENAGA KERJA 43,975.00
B BAHAN
Semen portland kg 10.2240 1,520.00 15,540.48
Pasir pasang m3 0.0200 115,000.00 2,300.00
JUMLAH HARGA BAHAN 17,840.48
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 61,815.48


E Overhead & Profit 10.00% 6,181.55
F Harga Satuan Pekerjaaan (D+E) 67,997.03
Pemasangan 1 m² acian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.2000 95,000.00 19,000.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0100 145,000.00 1,450.00
JUMLAH TENAGA KERJA 33,750.00
B BAHAN
Semen portland kg 3.2500 1,520.00 4,940.00
JUMLAH HARGA BAHAN 4,940.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 38,690.00


E Overhead & Profit 10.00% 3,869.00
F Harga Satuan Pekerjaaan (D+E) 42,559.00
Pemasangan 1 m2 rangka hollow mudul 100x100cm (40.40.2mm), modul 60 x 60 cm (20.40.2 mm)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3500 95,000.00 33,250.00
Tukang besi L.02 OH 0.3500 120,000.00 42,000.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0180 145,000.00 2,610.00
JUMLAH TENAGA KERJA 82,410.00
B BAHAN
Rangka metal hollow 40.40.2 mm m' 4.0000 6,500.00 26,000.00
Rangka metal hollow 40.20.2 mm m' 3.0000 5,000.00 15,000.00
assesoris (perkuatan, las, dll) Ls 30% 41,000.00 12,300.00
JUMLAH HARGA BAHAN 53,300.00
C PERALATAN
Alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 140,710.00


E Overhead & Profit 10.00% 14,071.00
F Harga Satuan Pekerjaaan (D+E) 154,781.00
Pemasangan 1 m² langit-langit gypsum board ukuran (120x240x9)mm. tebal 9mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.1000 95,000.00 9,500.00
Tukang kayu L.02 OH 0.0500 120,000.00 6,000.00
Kepala tukang L.03 OH 0.0050 130,000.00 650.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 16,875.00
B BAHAN
Gypsum board Lbr 0.3640 81,500.00 29,666.00
Paku skrup kg 0.1100 250.00 27.50
JUMLAH HARGA BAHAN 29,693.50
C PERALATAN
alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 51,568.50


E Overhead & Profit 10.00% 5,156.85
F Harga Satuan Pekerjaaan (D+E) 56,725.35
Pengecatan 1 m² tembok luar (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0200 95,000.00 1,900.00
Tukang cat L.02 OH 0.0630 120,000.00 7,560.00
JUMLAH TENAGA KERJA 9,460.00
B BAHAN
Plamuur ltr 0.1000 25,000.00 2,500.00
Cat dasar kg 0.1000 27,500.00 2,750.00
Cat Weather Coat setara Mowilex ltr 0.3500 65,000.00 22,750.00
Amplas Lbr 0.2600 3,000.00 780.00
JUMLAH HARGA BAHAN 28,780.00
C PERALATAN
Kuas 4" bh 0.250 5,000.00 1,250.00
JUMLAH HARGA ALAT 1,250.00

D Jumlah (A+B+C) 39,490.00


E Overhead & Profit 10.00% 3,949.00
F Harga Satuan Pekerjaaan (D+E) 43,439.00
Pengecatan 1 m² tembok dalam (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0200 95,000.00 1,900.00
Tukang cat L.02 OH 0.0630 120,000.00 7,560.00
JUMLAH TENAGA KERJA 9,460.00
B BAHAN
Plamuur ltr 0.1000 25,000.00 2,500.00
Cat dasar kg 0.1000 27,500.00 2,750.00
Cat Tembok Dalam setara Mowilex lter 0.3500 55,000.00 19,250.00
Amplas Lbr 0.2600 3,000.00 780.00
JUMLAH HARGA BAHAN 25,280.00
C PERALATAN
Kuas 4" bh 0.250 5,000.00 1,250.00
JUMLAH HARGA ALAT 1,250.00

D Jumlah (A+B+C) 35,990.00


E Overhead & Profit 10.00% 3,599.00
F Harga Satuan Pekerjaaan (D+E) 39,589.00
Pengecatan 1 m² Plafond
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0300 95,000.00 2,850.00
Tukang cat L.02 OH 0.0945 120,000.00 11,340.00
Kepala tukang L.03 OH 0.0095 130,000.00 1,228.50
Mandor L.04 OH 0.0045 145,000.00 652.50
JUMLAH TENAGA KERJA 16,071.00
B BAHAN
Plamuur ltr 0.1000 25,000.00 2,500.00
Cat Dasar kg 0.1000 27,500.00 2,750.00
Cat Penutup Kg 0.3500 35,000.00 12,250.00
Amplas Lbr 0.2600 3,000.00 780.00
JUMLAH HARGA BAHAN 18,280.00
C PERALATAN
Kuas 4" bh 0.250 5,000.00 1,250.00
JUMLAH HARGA ALAT 1,250.00

D Jumlah (A+B+C) 35,601.00


E Overhead & Profit 10.00% 3,560.10
F Harga Satuan Pekerjaaan (D+E) 39,161.10
Pengecatan 1 m² permukaan baja dengan menie besi
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0200 95,000.00 1,900.00
Tukang cat L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 132,000.00 2,640.00
Mandor L.04 OH 0.0025 145,000.00 362.50
JUMLAH TENAGA KERJA 28,902.50
B BAHAN
Menie besi kg 0.1000 45,000.00 4,500.00
JUMLAH HARGA BAHAN 4,500.00
C PERALATAN
Kuas bh 0.0100 5,000.00 50.00
JUMLAH HARGA ALAT 50.00

D Jumlah (A+B+C) 33,452.50


E Overhead & Profit 10.00% 3,345.25
F Harga Satuan Pekerjaaan (D+E) 36,797.75
Cat Bidang Kayu Baru ( 1 x Plamir,1 x Cat Dasar 2x Cat Penutup) M2
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0700 Rp 95,000.00 Rp 6,650.00
2 Tukang OH 0.0090 Rp 120,000.00 Rp 1,080.00
3 Kepala Tukang OH 0.0060 Rp 130,000.00 Rp 780.00
4 Mandor OH 0.0030 Rp 145,000.00 Rp 435.00
Jumlah Tenaga Kerja Rp 8,945.00
B. BAHAN
1 Cat Menie Kg 0.2000 Rp 25,000.00 Rp 5,000.00
2 Plamir Kayu Kg 0.1500 Rp 25,000.00 Rp 3,750.00
3 Cat Dasar Kayu Kg 0.1700 Rp 27,500.00 Rp 4,675.00
4 Cat Kayu penutup Kg 0.2600 Rp 35,000.00 Rp 9,100.00
5 Kuas Bh 0.0100 Rp 5,000.00 Rp 50.00
6 Pengecer / Minyak Cat Liter 0.0300 Rp 12,500.00 Rp 375.00
7 Kertas Amplas Lembar 0.2000 Rp 3,000.00 Rp 600.00
Jumlah Bahan Rp 23,550.00
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 32,495.00
E Overhead & Profit 10% X D Rp 3,249.50
F Harga Satuan Pekerjaan ( D + E ) Rp 35,744.50
Memasang List Profil Kayu M2
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0500 Rp 95,000.00 Rp 4,750.00
2 Tukang OH 0.0500 Rp 120,000.00 Rp 6,000.00
3 Kepala Tukang OH 0.0050 Rp 130,000.00 Rp 650.00
4 Mandor OH 0.0030 Rp 145,000.00 Rp 435.00
Jumlah Tenaga Kerja Rp 11,835.00
B. BAHAN
1 List Eternit Kayu M 1.0500 Rp 8,000.00 Rp 8,400.00
2 Paku kayu Kg 0.0100 Rp 18,000.00 Rp 180.00
Jumlah Bahan Rp 8,580.00
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 20,415.00
E Overhead & Profit 10% X D Rp 2,041.50
F Harga Satuan Pekerjaan ( D + E ) Rp 22,456.50
Memasang 1 M2 Kaca Tebal 5mm M2
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0150 Rp 95,000.00 Rp 1,425.00
2 Tukang OH 0.1500 Rp 120,000.00 Rp 18,000.00
3 Kepala Tukang OH 0.0150 Rp 130,000.00 Rp 1,950.00
4 Mandor OH 0.0008 Rp 145,000.00 Rp 116.00
Jumlah Tenaga Kerja Rp 21,491.00
B. BAHAN
1 Kaca Tebal 5mm M2 1.1000 Rp 275,000.00 Rp 302,500.00
2 Sealant Kg 0.0500 Rp 35,000.00 Rp 1,750.00
Jumlah Bahan Rp 304,250.00
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 325,741.00
E Overhead & Profit 10% X D Rp 32,574.10
F Harga Satuan Pekerjaan ( D + E ) Rp 358,315.10
DAFTAR UPAH DAN HARGA MATERIAL

NO. DAFTAR UPAH SAT. HARGA

1 Pekerja Org/Hr Rp. 95,000.00


2 Tukang Batu Org/Hr Rp. 120,000.00
3 Kepala Tukang Org/Hr Rp. 130,000.00
4 Mandor Org/Hr Rp. 145,000.00
5 Tukang Org/Hr Rp. 120,000.00
6 Operator crane Org/Hr Rp. 250,000.00
7 Operator Org/Hr Rp. 200,000.00
8 Operator Alat Berat Org/Hr Rp. 250,000.00
9 Tukang Cat Org/Hr Rp. 120,000.00
10 Tukang Kayu Org/Hr Rp. 120,000.00
11 Tukang Las Konstruksi Org/Hr Rp. 120,000.00
12 Tukang Las Biasa Org/Hr Rp. 120,000.00
13 Tukang Pipa Org/Hr Rp. 120,000.00
###
14 Tukang Khusus Alumunium Org/Hr Rp. 120,000.00
15 Tukang Vibrator Org/Hr Rp. 120,000.00
16 Tukang erection Org/Hr Rp. 120,000.00
17 Tukang Besi Org/Hr Rp. 120,000.00
18 Pembantu operator crane Org/Hr Rp. 150,000.00

NO. JENIS MATERIAL SAT. HARGA

AGREGAT HALUS :
1 Pasir urug / Pasir Timbun M3 Rp. 110,000.00
2 Pasir pasang/kali M3 Rp. 115,000.00
3 Pasir Beton M3 Rp. 115,000.00
4 Sirtu M3 Rp. 115,000.00
5 Tanah Timbunan M3 Rp. 100,000.00
6 Kerirkil M3 Rp. 265,000.00

AGREGAT KASAR :
1 Batu pecah 0,5 - 1 M3 Rp. 350,000.00
2 Batu koral/Batu pecah 2-3 (kerikil) M3 Rp. 325,000.00
3 Batu Kali M3 Rp. 265,000.00
4 Batu Bata ukuran tebal Bh Rp. 700.00
5 Kapur zak Rp. 77,500.00

SEMEN:
1 Semen Tonasa @ 50 Kg Zak Rp. 76,000.00
2 Semen Tonasa @ 40 Kg Zak Rp. 54,000.00
3 Semen Bosowa @ 50 Kg Zak Rp. 63,000.00
4 Semen Warna Kg Rp. 3,500.00
5 Semen Putih Zak Rp. 100,000.00
6 Semen Portland kg Rp. 1,520.00

BETON READY MIX


1 K - 225 M3 Rp. 908,250.00
2 K - 250 M3 Rp. 918,750.00
3 K - 275 M3 Rp. 971,250.00
3 K - 300 M3 Rp. 1,050,000.00
4 K - 325 M3 Rp. 1,076,250.00
5 K - 350 M3 Rp. 1,102,500.00

HAL-28
DAFTAR UPAH DAN HARGA MATERIAL

NO. DAFTAR UPAH SAT. HARGA


KAYU:
Kayu Balok:
1 Balok 4/6 - 6/12 Klas I M3 Rp. 11,000,000.00
2 Balok Reng 2/3 klas I M3 Rp. 11,000,000.00
3 Balok 4/6 - 6/12 Klas I M3 Rp. 11,000,000.00
4 Balok 5/7 kls III M3 Rp. 2,500,000.00
5 Kayu kelas II (Balok) M3 Rp. 3,150,000.00

1 Kayu Kelas I (Seumantok /Ulim /dll) M3 Rp. 5,500,000.00


2 Kayu Kelas II (Kamper /Kruing /dll) M3 Rp. 4,750,000.00
3 Kayu Kelas III (Borneo /dll) M3 Rp. 3,900,000.00
4 Kayu Kelas IV (Sengon /dll) M3 Rp. 3,500,000.00
5 Kayu Dolken Btg Rp. 70,000.000

Kayu Papan :
1 Papan (Meranti) M3 Rp. 2,500,000.00
2 Papan (Natou) M3 Rp. 5,000,000.00
3 Papan (Kapur) M3 Rp. 5,000,000.00
4 Papan bayam SM M3 Rp. 11,000,000.00
5 Papan jati raha SM M3 Rp. 11,000,000.00
6 Kayu Papan 3/20 kls III M3 Rp. 2,500,000.00
7 Minyak Bekisting Ltr Rp. 7,500.00
8 Penjaga jarak bekisting(Spacer) bh Rp. 7,500.00

BAMBU :
1 Bambu Petung btg Rp. 30,000.00
2 Bambu Besar btg Rp. 20,000.00
3 Bambu Sedang btg Rp. 15,000.00
4 Bambu Kecil btg Rp. 12,500.00

KAYU LAPIS :
1 Multipleks 18mm lbr Rp. 275,000.00
2 Multipleks 15mm lbr Rp. 250,000.00
3 Multipleks 12mm lbr Rp. 200,000.00
4 Tripleks 9 mm lbr Rp. 130,000.00
5 Tripleks 6 mm lbr Rp. 91,000.00
6 Tripleks 4 mm lbr Rp. 62,000.00
8 HPL m2 Rp. 200,000.00
9 Tripleks 3 mm lbr Rp. 55,000.00
12 Kalsiboard lbr Rp. 78,500.00

BAHAN TIANG PANCANG


Tiang Pancang dia. 40cm K-600 m' Rp. 550,000.00

BAHAN DINDING & LANGIT-LANGIT


1 Gypsum knauf 9mm lbr Rp. 89,500.00
2 Gypsum Elephant 9 mm lbr Rp. 96,500.00
3 Gypsum jayaboard 9mm lbr Rp. 81,500.00
8 Glasswall m2 Rp. 75,000.00
9 Kalsiboard lbr Rp. 78,500.00

PAKU:
1 2, 3, 4 cm Kg Rp. 20,900.00
2 5, 7, 10, 12 cm Kg Rp. 23,000.00
3 Paku Beton 2, 3, 4 cm Dos Rp. 15,700.00
HAL-29
DAFTAR UPAH DAN HARGA MATERIAL

NO. DAFTAR UPAH SAT. HARGA


4 Paku Beton 5, 7, 10 cm Dos Rp. 16,700.00
9 Paku Biasa kg Rp. 15,700.00
10 Paku Seng Kg Rp 20,000.00
11 Paku Kayu Kg Rp 18,000.00
BESI:
1 Besi tulangan (besi beton) Kg Rp. 9,460.00
3 Rangka metal hollow 40.40.2 mm m' Rp. 6,500.00
4 Rangka metal hollow 40.20.2 mm m' Rp. 5,000.00
5 Besi Baja IWF Kg Rp. 13,500.00
8 Kawat Beton Kg Rp. 20,900.00
9 Besi siku L 30.30.3 Kg Rp. 15,000.00
10 Besi plat baja t = 1mm Kg Rp. 15,000.00
11 Besi plat baja t = 2mm Kg Rp. 15,000.00
15 Wire mesh M- 8 m2 Rp. 165,000.00
16 Besi Profil kg Rp. 16,500.00
23 Besi Strip kg Rp. 33,858.00
24 Kawat Las kg Rp. 35,000.00
25 Profil C 75. 100 M' Rp. 20,000.00
26 Profil C 75. 75 M' Rp. 15,250.00
27 Profil U 50.60.100 M' Rp. 35,000.00
28 Profil U 35.30.40 M' Rp. 17,500.00
29 Screw Kuda-kuda 12-14x40 bh Rp. 1,000.00
30 Screw Reng 10-16x16 bh Rp. 1,000.00
31 Steel Floor Decking m2 Rp. 175,000.00

KERAMIK DAN BATU ALAM


Vinyl 15x90 bh Rp. 43,875.00
1 Keramik 60 x 60 bh Rp. 90,000.00
2 Keramik 30x60 bh Rp. 25,333.33
Keramik 40x40 bh Rp. 12,833.33
3 Keramik Biasa Uk. 30 cm x 30 cm bh Rp. 6,454.55
4 Keramik 20 x 25 bh Rp. 2,960.00
5 Homogeneus Tile 60 x 60 E bh Rp. 91,666.67
7 stop nosing bh Rp. 25,000.00
8 Paving Block t = 8cm K - 300 bh Rp. 2,750.00
9 Plint keramik 10/60 bh Rp. 15,000.00
10 Plint rumah sakit bh Rp. 25,000.00
11 Plint vinyl bh Rp. 19,500.00

KUNCI PINTU + HANDLE PINTU


1 Kunci pintu setara sess set Rp. 400,000.00
2 Kunci Tanam bh Rp. 203,500.00
3 Kunci Tanam Antik bh Rp. 450,000.00
4 Kunci Tanam KM bh Rp. 125,000.00
5 Kunci Silinder bh Rp. 375,000.00
6 Kunci locked card system bh Rp. 1,250,000.00
8 Handle Pintu set Rp. 350,000.00
9 Door closer bh Rp. 275,000.00
10 Door Holder bh Rp. 100,000.00
11 Door Stop bh Rp. 12,500.00
13 Grendel bh Rp. 35,000.00
14 Kunci Alumunium bh Rp. 350,000.00
15 Grendel jendela bh Rp. 10,450.00
16 Hak Angin psg Rp. 15,700.00
17 Jendela Nako bh Rp. 225,500.00

HAL-30
DAFTAR UPAH DAN HARGA MATERIAL

NO. DAFTAR UPAH SAT. HARGA


18 Skrup fixer bh Rp. 300.00
19 Sealant tube Rp. 35,000.00

ENGSEL
1 Merk SESS 4 x 3 bh Rp. 35,000.00
2 Engsel jendela bh Rp. 21,000.00
3 Engsel Pintu bh Rp. 36,200.00
Engsel pintu alumunium bh Rp. 25,000.00
4 Engsel alumunium bh Rp. 20,000.00
5 Engsel Angin bh Rp. 35,000.00
6 Spring Knip bh Rp. 25,000.00

ALUMUNIUM + STAINLESS STEEL


1 Rangka Pintu m' Rp. 125,000.00
2 Profil Aluminium m Rp. 65,000.00
3 Alumunium 4" m' Rp. 127,500.00
4 Alumunium 4" tebal 1mm m' Rp. 112,500.00
5 Alumunium rangka tegak curtain wall 4" m' Rp. 85,000.00
6 Alumunium rangka datar 4" m' Rp. 65,000.00
7 Alumunium rangka tegak curtain wall 6" Setara m' Rp. 250,000.00
YKK
9 Pintu alumunium uk 80 x 210 bh Rp. 750,000.00
13 Rangka jendela m' Rp. 75,000.00
17 Metal stud 76mm m' Rp. 50,000.00
18 Alumunium Composite Panel (type PPDF) m2 Rp. 350,000.00
5 Kaca Tebal 5mm Panasap m2 Rp. 275,000.00
6 Kaca Tebal 6mm Panasap m2 Rp. 285,000.00
7 Kaca Tebal 8mm Panasap m2 Rp. 500,000.00
8 Kaca Tebal 10mm Panasap m2 Rp. 1,250,000.00
9 Kaca cermin Tebal 5mm m2 Rp. 200,000.00
10 Kaca cermin Tebal 8mm m2 Rp. 500,000.00
13 Kaca Polos m2 Rp. 109,100.00

CAT TEMBOK :
2 Cat Dasar/Undercoat setara Mowilex Ltr Rp. 47,500.00
3 Cat Weather Coat setara Mowilex Ltr Rp. 65,000.00
4 Cat Tembok Dalam setara Mowilex Ltr Rp. 55,000.00
5 Cat dalam mowileks Vinil silk Ltr Rp. 70,000.00
6 Cat epoxi setara jotun Ltr Rp. 125,000.00

BAHAN CAT BESI / KAYU :


1 Cat Dasar kg Rp. 27,500.00
2 Cat Antara kg Rp. 27,500.00
3 Cat Penutup kg Rp. 35,000.00
4 Cat meni Besi kg Rp. 45,000.00
5 Cat Menie kg Rp. 25,000.00
Epoxi Kg Rp. 75,000.00
10 Plamur kg Rp. 25,000.00
11 Kuas bh Rp. 5,000.00
19 Tinner super ltr Rp. 12,500.00

BAHAN ATAP
1 Spandeks t = 0,4mm m' Rp. 58,000.00
2 Nok Atap Zinc Alum t = 0,4mm m' Rp. 30,000.00
3 Ram kawat 1 x 1 m2 Rp. 8,500.00

HAL-31
DAFTAR UPAH DAN HARGA MATERIAL

NO. DAFTAR UPAH SAT. HARGA


4 Alumunium foil m2 Rp. 5,000.00
5 Seng gelombang m' Rp. 45,000.00

HAL-32
DAFTAR UPAH DAN HARGA MATERIAL

NO. DAFTAR UPAH SAT. HARGA


SANITASI/SALURAN AIR
1 Waterstop m' Rp. 200,000.00
2 Kloset Duduk Tabung unit Rp. 2,550,000.00
3 Kloset Jongkok unit Rp. 385,000.00
4 Urinoir unit Rp. 2,705,000.00
5 Wastafel unit Rp. 1,250,000.00
6 Bathtub unit Rp. 3,000,000.00
7 Bak fiberglass unit Rp. 750,000.00
8 Bak Cuci Piring unit Rp. 750,000.00
9 Water Drain unit Rp. 150,000.00
10 Floor Drain unit Rp. 21,000.00
11 Pipa galvanis φ ½" bh Rp. 20,000.00
12 Sealtape bh Rp. 4,500.00
13 Kran Air m' Rp. 85,500.00
14 Pipa galvanis φ 3/4" m' Rp. 44,673.33
15 Pipa galvanis φ 2" m' Rp. 141,193.33
16 Pipa galvanis φ 1.5" m' Rp. 92,006.67
17 Pipa galvanis φ 1" m' Rp. 61,420.00
18 Pipa PVC φ ¾" m' Rp. 5,000.00
19 Pipa PVC φ 1" m' Rp. 7,500.00
20 Pipa PVC φ 1½" m' Rp. 10,000.00
21 Pipa PVC D φ 2" m' Rp. 15,000.00
22 Pipa PVC AW φ 2" m' Rp. 17,500.00
23 Pipa PVC D φ 21/2" m' Rp. 20,000.00
24 Pipa PVC AW φ 2½" m' Rp. 25,000.00
25 Pipa PVC D φ 3" m' Rp. 36,000.00
26 Pipa PVC AW φ 3" m' Rp. 40,000.00
27 Pipa PVC D φ 4" m' Rp. 57,000.00
28 Pipa PVC AW φ 4" m' Rp. 60,000.00
29 Pipa PVC AW φ 6" m; Rp. 127,000.00
30 Kran Leher angsa bh Rp. 127,000.00

Material Elektrikal
1 Cok Lampu Besar Buah Rp. Rp 12,500
2 Cok Lampu Kecil Buah Rp. Rp 6,500
3 Kabel Listrik NYM 1x2,5mm Roll Rp. Rp 355,000
4 Kabel Listrik NYM 2x1,5mm Roll Rp. Rp 655,000
5 Kabel Listrik NYM 2x2,5mm Roll Rp. Rp 885,000
6 Kabel Listrik NYM 3x1.5 mm Roll Rp. Rp 995,500
7 Kabel Listrik Eterna 3x2.5 mm Roll Rp. Rp 1,285,000
8 Box Panel isi 2 MCB Rp. Rp 24,000
9 Box Panel isi 4 MCB Rp. Rp 45,000
10 MCB 4 A Rp. Rp 45,500
11 MCB 6 A Rp. Rp 51,000
12 Isolator Rp. Rp 2,500
13 Saklar Tunggal Rp. Rp 26,000
14 Saklar Ganda Rp. Rp 36,500
15 Stop Kontak Besar Rp. Rp 29,500
16 Stop Kontak Kecil Rp. Rp 18,500
17 Down Light Rp. Rp 61,500
18 RM 300 GLOSS ALML Reflektor 2x 18 W Rp. Rp 225,000
19 Fitting Plafon Rp. Rp 16,500
20 Lampu Philips Sumpit 5 Watt Buah Rp. Rp 34,000
21 Lampu Philips Sumpit 8 Watt Buah Rp. Rp 40,000
22 Lampu Philips Sumpit 14 Watt Buah Rp. Rp 50,000

HAL-33
DAFTAR UPAH DAN HARGA MATERIAL

NO. DAFTAR UPAH SAT. HARGA


23 Lampu Philips Sumpit 18 Watt Buah Rp. Rp 65,000
24 Down Light philip Rp. Rp 89,000

Lain- lain
1 Air ltr Rp. 3,500.00
2 Solar ltr Rp. 5,500.00
3 Minyak Pelumas ltr Rp. 35,000.00
4 Lem Fox kg Rp. 125,000.00
7 Lem Kayu kg Rp. 250,000.00
9 Amplas lbr Rp. 3,000.00
12 Wallpaper m2 Rp. 60,000.00
13 Perancah Kayu m3 Rp. 3,500,000.00
14 Tandom TDA 3600 L buah 3,850,000.00
15 Minyak Bekisting Liter Rp. 8,000.00
Lain- lain
1 Hummer + Crane jam Rp. 500,000.00
2 Mesin Las jam Rp. 250,000.00
3 Trowel jam Rp. 200,000.00
4 List Eternit Kayu M1 Rp 8,000.00

HAL-34
HARGA SATUAN PEKERJAAN PLESTERAN

1 Pemasangan 1 m² plesteran 1SP:1PP tebal 15mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3000 95,000.00 28,500.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0150 145,000.00 2,175.00
JUMLAH TENAGA KERJA 43,975.00
B BAHAN
Semen portland kg 15.5040 1,520.00 23,566.08
Pasir pasang m3 0.0160 115,000.00 1,840.00
JUMLAH HARGA BAHAN 25,406.08
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 69,381.08


E Overhead & Profit 10.00% 6,938.11
F Harga Satuan Pekerjaaan (D+E) 76,319.19

2 Pemasangan 1 m² plesteran 1SP:2PP tebal 15mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3000 95,000.00 28,500.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0150 145,000.00 2,175.00
JUMLAH TENAGA KERJA 43,975.00
B BAHAN
Semen portland kg 10.2240 1,520.00 15,540.48
Pasir pasang m3 0.0200 115,000.00 2,300.00
JUMLAH HARGA BAHAN 17,840.48
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 61,815.48


E Overhead & Profit 10.00% 6,181.55
F Harga Satuan Pekerjaaan (D+E) 67,997.03

HAL-35
3 Pemasangan 1 m² plesteran 1SP:3PP tebal 15mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3000 95,000.00 28,500.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0150 145,000.00 2,175.00
JUMLAH TENAGA KERJA 43,975.00
B BAHAN
Semen portland kg 7.7760 1,520.00 11,819.52
Pasir pasang m3 0.0230 115,000.00 2,645.00
JUMLAH HARGA BAHAN 14,464.52
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,439.52


E Overhead & Profit 10.00% 5,843.95
F Harga Satuan Pekerjaaan (D+E) 64,283.47

4 Pemasangan 1 m² plesteran 1SP:4PP tebal 15mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3000 95,000.00 28,500.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0150 145,000.00 2,175.00
JUMLAH TENAGA KERJA 43,975.00
B BAHAN
Semen portland kg 6.2400 1,520.00 9,484.80
Pasir pasang m3 0.0240 115,000.00 2,760.00
JUMLAH HARGA BAHAN 12,244.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,219.80


E Overhead & Profit 10.00% 5,621.98
F Harga Satuan Pekerjaaan (D+E) 61,841.78

HAL-36
5 Pemasangan 1 m² plesteran 1SP:5PP tebal 15mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3000 95,000.00 28,500.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0150 145,000.00 2,175.00
JUMLAH TENAGA KERJA 43,975.00
B BAHAN
Semen portland kg 5.1840 1,520.00 7,879.68
Pasir pasang m3 0.0260 115,000.00 2,990.00
JUMLAH HARGA BAHAN 10,869.68
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 54,844.68


E Overhead & Profit 10.00% 5,484.47
F Harga Satuan Pekerjaaan (D+E) 60,329.15

6 Pemasangan 1 m² plesteran 1SP:6PP tebal 15mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3000 95,000.00 28,500.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0150 145,000.00 2,175.00
JUMLAH TENAGA KERJA 43,975.00
B BAHAN
Semen portland kg 4.4160 1,520.00 6,712.32
Pasir pasang m3 0.0270 115,000.00 3,105.00
JUMLAH HARGA BAHAN 9,817.32
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 53,792.32


E Overhead & Profit 10.00% 5,379.23
F Harga Satuan Pekerjaaan (D+E) 59,171.55

HAL-37
7 Pemasangan 1 m² plesteran 1SP:7PP tebal 15mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3000 95,000.00 28,500.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0150 145,000.00 2,175.00
JUMLAH TENAGA KERJA 43,975.00
B BAHAN
Semen portland kg 3.9360 1,520.00 5,982.72
Pasir pasang m3 0.0280 115,000.00 3,220.00
JUMLAH HARGA BAHAN 9,202.72
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 53,177.72


E Overhead & Profit 10.00% 5,317.77
F Harga Satuan Pekerjaaan (D+E) 58,495.49

8 Pemasangan 1 m² plesteran 1SP:8PP tebal 15mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3000 95,000.00 28,500.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0150 145,000.00 2,175.00
JUMLAH TENAGA KERJA 43,975.00
B BAHAN
Semen portland kg 3.4560 1,520.00 5,253.12
Pasir pasang m3 0.0290 115,000.00 3,335.00
JUMLAH HARGA BAHAN 8,588.12
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 52,563.12


E Overhead & Profit 10.00% 5,256.31
F Harga Satuan Pekerjaaan (D+E) 57,819.43

HAL-38
9 Pemasangan 1 m² plesteran 1SP:1PP tebal 20mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.4000 95,000.00 38,000.00
Tukang batu L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 130,000.00 2,600.00
Mandor L.04 OH 0.0220 145,000.00 3,190.00
JUMLAH TENAGA KERJA 67,790.00
B BAHAN
Semen portland kg 13.6320 1,520.00 20,720.64
Pasir pasang m3 0.0270 115,000.00 3,105.00
JUMLAH HARGA BAHAN 23,825.64
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 91,615.64


E Overhead & Profit 10.00% 9,161.56
F Harga Satuan Pekerjaaan (D+E) 100,777.20

10 Pemasangan 1m² plesteran 1SP:3PP tebal 20mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.2600 95,000.00 24,700.00
Tukang batu L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 130,000.00 2,600.00
Mandor L.04 OH 0.0130 145,000.00 1,885.00
JUMLAH TENAGA KERJA 53,185.00
B BAHAN
Semen portland kg 10.3680 1,520.00 15,759.36
Pasir pasang m3 0.0310 115,000.00 3,565.00
JUMLAH HARGA BAHAN 19,324.36
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 72,509.36


E Overhead & Profit 10.00% 7,250.94
F Harga Satuan Pekerjaaan (D+E) 79,760.30

HAL-39
11 Pemasangan 1 m² plesteran 1SP:4PP tebal 20mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.4000 95,000.00 38,000.00
Tukang batu L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 130,000.00 2,600.00
Mandor L.04 OH 0.0220 145,000.00 3,190.00
JUMLAH TENAGA KERJA 67,790.00
B BAHAN
Semen portland kg 8.3200 1,520.00 12,646.40
Pasir pasang m3 0.0320 115,000.00 3,680.00
JUMLAH HARGA BAHAN 16,326.40
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 84,116.40


E Overhead & Profit 10.00% 8,411.64
F Harga Satuan Pekerjaaan (D+E) 92,528.04

12 Pemasangan 1 m² plesteran 1SP:5PP tebal 20mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.4000 95,000.00 38,000.00
Tukang batu L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 130,000.00 2,600.00
Mandor L.04 OH 0.0220 145,000.00 3,190.00
JUMLAH TENAGA KERJA 67,790.00
B BAHAN
Semen portland kg 6.9120 1,520.00 10,506.24
Pasir pasang m3 0.0350 115,000.00 4,025.00
JUMLAH HARGA BAHAN 14,531.24
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 82,321.24


E Overhead & Profit 10.00% 8,232.12
F Harga Satuan Pekerjaaan (D+E) 90,553.36

HAL-40
13 Pemasangan 1 m² acian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.2000 95,000.00 19,000.00
Tukang batu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0100 145,000.00 1,450.00
JUMLAH TENAGA KERJA 33,750.00
B BAHAN
Semen portland kg 3.2500 1,520.00 4,940.00
JUMLAH HARGA BAHAN 4,940.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 38,690.00


E Overhead & Profit 10.00% 3,869.00
F Harga Satuan Pekerjaaan (D+E) 42,559.00

14 Pemasangan 1 m² plesteran 1SP:4PP tebal 20mm motif


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.4000 95,000.00 38,000.00
Tukang batu L.02 OH 0.3000 120,000.00 36,000.00
Kepala tukang L.03 OH 0.0200 130,000.00 2,600.00
Mandor L.04 OH 0.0220 145,000.00 3,190.00
JUMLAH TENAGA KERJA 79,790.00
B BAHAN
Semen portland kg 8.3200 1,520.00 12,646.40
Pasir pasang m3 0.0320 115,000.00 3,680.00
alumiunium 2x2 m1 5.0000 5,000.00 25,000.00
Paku kg 0.1000 23,000.00 2,300.00
JUMLAH HARGA BAHAN 43,626.40
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 123,416.40


E Overhead & Profit 10.00% 12,341.64
F Harga Satuan Pekerjaaan (D+E) 135,758.04

HAL-41
HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

1 Pemasangan 1 m² lantai Vinyl


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.7000 95,000.00 66,500.00
Tukang batu L.02 OH 0.3500 120,000.00 42,000.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0350 145,000.00 5,075.00
JUMLAH TENAGA KERJA 118,125.00
B BAHAN
Vinyl 15x90 bh 7.4074 43,875.00 325,000.00
Lem Vinyl kg 0.3500 250,000.00 87,500.00
JUMLAH HARGA BAHAN 412,500.00
C PERALATAN
Alat pemotong ls 1.000 2500 2,500.00
JUMLAH HARGA ALAT 2,500.00

D Jumlah (A+B+C) 533,125.00


E Overhead & Profit 10.00% 53,312.50
F Harga Satuan Pekerjaaan (D+E) 586,437.50

1 Pemasangan 1 m² lantai Keramik 60 x 60cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.7000 95,000.00 66,500.00
Tukang batu L.02 OH 0.3500 120,000.00 42,000.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0350 145,000.00 5,075.00
JUMLAH TENAGA KERJA 118,125.00
B BAHAN
Keramik 60x60 bh 2.7778 90,000.00 250,000.00
Semen portland kg 9.8000 1,520.00 14,896.00
Pasir pasang m3 0.0450 115,000.00 5,175.00
JUMLAH HARGA BAHAN 270,071.00
C PERALATAN
Alat pemotong ls 1.000 2500 2,500.00
JUMLAH HARGA ALAT 2,500.00

D Jumlah (A+B+C) 390,696.00


E Overhead & Profit 10.00% 39,069.60
F Harga Satuan Pekerjaaan (D+E) 429,765.60

HAL-42
3 Pemasangan 1 m² lantai type H keramik ukuran 20x20cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.7000 95,000.00 66,500.00
Tukang batu L.02 OH 0.3500 120,000.00 42,000.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0350 145,000.00 5,075.00
JUMLAH TENAGA KERJA 118,125.00
B BAHAN
Ubin keramik 20x20 bh 25.0000 2,960.00 74,000.00
Semen portland kg 8.1900 1,520.00 12,448.80
Semen warna kg 1.6200 3,500.00 5,670.00
Pasir pasang m3 0.0450 115,000.00 5,175.00
JUMLAH HARGA BAHAN 97,293.80
C PERALATAN
Alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 220,418.80


E Overhead & Profit 10.00% 22,041.88
F Harga Satuan Pekerjaaan (D+E) 242,460.68

4 Pemasangan 1 m' Step nosing


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0900 95,000.00 8,550.00
Tukang batu L.02 OH 0.0900 120,000.00 10,800.00
Kepala tukang L.03 OH 0.0090 130,000.00 1,170.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 21,245.00
B BAHAN
Step nosing bh 5.0000 25,000.00 125,000.00
Semen portland kg 1.1400 1,520.00 1,732.80
Semen warna kg 0.1000 3,500.00 350.00
Pasir pasang m3 0.0030 115,000.00 345.00
JUMLAH HARGA BAHAN 127,427.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 148,672.80


E Overhead & Profit 10.00% 14,867.28
F Harga Satuan Pekerjaaan (D+E) 163,540.08

HAL-43
5 Pemasangan 1 m² lantai keramik ukuran 30x30cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.7000 95,000.00 66,500.00
Tukang batu L.02 OH 0.3500 120,000.00 42,000.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0350 145,000.00 5,075.00
JUMLAH TENAGA KERJA 118,125.00
B BAHAN
Ubin keramik bh 11.1100 6,454.55 71,710.00
Semen portland kg 8.1900 1,520.00 12,448.80
Semen warna kg 1.6200 3,500.00 5,670.00
Pasir pasang m3 0.0450 115,000.00 5,175.00
JUMLAH HARGA BAHAN 95,003.80
C PERALATAN
Alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 218,128.80


E Overhead & Profit 10.00% 21,812.88
F Harga Satuan Pekerjaaan (D+E) 239,941.68

6 Pemasangan 1 m² dinding keramik 40x40cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.9000 95,000.00 85,500.00
Tukang batu L.02 OH 0.4500 120,000.00 54,000.00
Kepala tukang L.03 OH 0.0450 130,000.00 5,850.00
Mandor L.04 OH 0.0450 145,000.00 6,525.00
JUMLAH TENAGA KERJA 151,875.00
B BAHAN
Porslen bh 6.2500 12,833.33 80,208.33
Semen portland kg 9.3000 1,520.00 14,136.00
Semen warna kg 1.9400 3,500.00 6,790.00
Pasir pasang m3 0.0180 115,000.00 2,070.00
JUMLAH HARGA BAHAN 103,204.33
C PERALATAN
alat bantu ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 260,079.33


E Overhead & Profit 10.00% 26,007.93
F Harga Satuan Pekerjaaan (D+E) 286,087.27

HAL-44
7 Pemasangan 1 m² dinding keramik 30x30cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.9000 95,000.00 85,500.00
Tukang batu L.02 OH 0.4500 120,000.00 54,000.00
Kepala tukang L.03 OH 0.0450 130,000.00 5,850.00
Mandor L.04 OH 0.0450 145,000.00 6,525.00
JUMLAH TENAGA KERJA 151,875.00
B BAHAN
Porslen bh 11.1100 12,833.33 142,578.33
Semen portland kg 9.3000 1,520.00 14,136.00
Semen warna kg 1.9400 3,500.00 6,790.00
Pasir pasang m3 0.0180 115,000.00 2,070.00
JUMLAH HARGA BAHAN 165,574.33
C PERALATAN
alat bantu 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 322,449.33


E Overhead & Profit 10.00% 32,244.93
F Harga Satuan Pekerjaaan (D+E) 354,694.27

8 Pemasangan 1 m² dinding homogeneous tile 60x60cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.3000 95,000.00 123,500.00
Tukang batu L.02 OH 0.6500 120,000.00 78,000.00
Kepala tukang L.03 OH 0.0650 130,000.00 8,450.00
Mandor L.04 OH 0.0650 145,000.00 9,425.00
JUMLAH TENAGA KERJA 219,375.00
B BAHAN
Keramik 60 x 60 bh 2.7800 91,666.67 254,833.33
Semen portland kg 12.4400 1,520.00 18,908.80
Semen warna kg 0.6500 3,500.00 2,275.00
Pasir pasang m3 0.0250 115,000.00 2,875.00
Paku 12cm bh 3.0000 150.00 450.00
JUMLAH HARGA BAHAN 279,342.13
C PERALATAN
alat bantu ls 1.000 10,000.00 10,000.00
JUMLAH HARGA ALAT 10,000.00

D Jumlah (A+B+C) 508,717.13


E Overhead & Profit 10.00% 50,871.71
F Harga Satuan Pekerjaaan (D+E) 559,588.85

HAL-45
9 Pemasangan 1 m² dinding tile 30x60cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.3000 95,000.00 123,500.00
Tukang batu L.02 OH 0.6500 120,000.00 78,000.00
Kepala tukang L.03 OH 0.0650 130,000.00 8,450.00
Mandor L.04 OH 0.0650 145,000.00 9,425.00
JUMLAH TENAGA KERJA 219,375.00
B BAHAN
Keramik 30 x 60 bh 5.5600 25,333.33 140,853.33
Semen portland kg 12.4400 1,520.00 18,908.80
Semen warna kg 0.6500 3,500.00 2,275.00
Pasir pasang m3 0.0250 115,000.00 2,875.00
Paku 12cm bh 3.0000 150.00 450.00
JUMLAH HARGA BAHAN 165,362.13
C PERALATAN
alat bantu ls 1.000 10,000.00 10,000.00
JUMLAH HARGA ALAT 10,000.00

D Jumlah (A+B+C) 394,737.13


E Overhead & Profit 10.00% 39,473.71
F Harga Satuan Pekerjaaan (D+E) 434,210.85

10 Pemasangan 1 m' plint granit tile 10x60cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0900 95,000.00 8,550.00
Tukang batu L.02 OH 0.0900 120,000.00 10,800.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 24,625.00
B BAHAN
Keramik 10/60 m' 1.6667 15,000.00 25,000.00
Semen portland kg 12.4400 1,520.00 18,908.80
Semen warna kg 0.6500 3,500.00 2,275.00
Pasir pasang m3 0.0250 115,000.00 2,875.00
Paku 12cm bh 3.0300 150.00 454.50
JUMLAH HARGA BAHAN 49,513.30
C PERALATAN
alat bantu ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 79,138.30


E Overhead & Profit 10.00% 7,913.83
F Harga Satuan Pekerjaaan (D+E) 87,052.13

HAL-46
Pemasangan 1 m' plint Vinyl tile 10x60cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0900 95,000.00 8,550.00
Tukang batu L.02 OH 0.0900 120,000.00 10,800.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 24,625.00
B BAHAN
Keramik 10/60 m' 1.6667 19,500.00 32,500.00
Lem Vinyl kg 0.3500 250,000.00 87,500.00
Paku 12cm bh 3.0300 150.00 454.50
JUMLAH HARGA BAHAN 120,454.50
C PERALATAN
alat bantu ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 150,079.50


E Overhead & Profit 10.00% 15,007.95
F Harga Satuan Pekerjaaan (D+E) 165,087.45

11 Pemasangan 1 m² plint rumahsakit tile 10x20cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0900 95,000.00 8,550.00
Tukang batu L.02 OH 0.0900 120,000.00 10,800.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 24,625.00
B BAHAN
Plint rumah sakit bh 5.0000 25,000.00 125,000.00
Semen portland kg 12.4400 1,520.00 18,908.80
Semen warna kg 0.6500 3,500.00 2,275.00
Pasir pasang m3 0.0250 115,000.00 2,875.00
Paku 7cm bh 10.0000 150.00 1,500.00
JUMLAH HARGA BAHAN 150,558.80
C PERALATAN
alat bantu ls 1.000 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 180,183.80


E Overhead & Profit 10.00% 18,018.38
F Harga Satuan Pekerjaaan (D+E) 198,202.18

HAL-47
12 Pemasangan 1 m² Paving block t = 8cm K-300
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.500 95,000.00 47,500.00
Tukang batu L.02 OH 0.250 120,000.00 30,000.00
Kepala tukang L.03 OH 0.010 130,000.00 1,300.00
Mandor L.04 OH 0.005 145,000.00 725.00
JUMLAH TENAGA KERJA 79,525.00
B BAHAN
Paving Block bh 50.0000 2,750.00 137,500.00
JUMLAH HARGA BAHAN 137,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 217,025.00


E Overhead & Profit 10.00% 21,702.50
F Harga Satuan Pekerjaaan (D+E) 238,727.50

HAL-48
SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

1 Pemasangan 1 m² langit-langit gypsum board ukuran (120x240x9)mm. tebal 9mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.1000 95,000.00 9,500.00
Tukang kayu L.02 OH 0.0500 120,000.00 6,000.00
Kepala tukang L.03 OH 0.0050 130,000.00 650.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 16,875.00
B BAHAN
Gypsum board Lbr 0.3640 96,500.00 35,126.00
Paku skrup kg 0.1100 250.00 27.50
JUMLAH HARGA BAHAN 35,153.50
C PERALATAN
alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 57,028.50


E Overhead & Profit 10.00% 5,702.85
F Harga Satuan Pekerjaaan (D+E) 62,731.35

2 Pemasangan 1 m² langit-langit Kalsiboard ukuran (120x240x9)mm. tebal 6mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.1000 95,000.00 9,500.00
Tukang kayu L.02 OH 0.0500 120,000.00 6,000.00
Kepala tukang L.03 OH 0.0050 130,000.00 650.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 16,875.00
B BAHAN
Kalsiboard Lbr 0.3640 78,500.00 28,574.00
Paku skrup kg 0.1100 250.00 27.50
JUMLAH HARGA BAHAN 28,601.50
C PERALATAN
alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 50,476.50


E Overhead & Profit 10.00% 5,047.65
F Harga Satuan Pekerjaaan (D+E) 55,524.15

HAL-1
3 Pemasangan 1 m² langit-langit gypsum board ukuran (120x240x9)mm. tebal 9mm + rangka hollow
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pas Rangka Hollow m2 1.0000 82,410.00 82,410.00
Upah pas. plafond gypsum m2 1.0000 16,875.00 16,875.00
JUMLAH TENAGA KERJA 99,285.00
B BAHAN
Rangka hollow m2 1.0000 53,300.00 53,300.00
Plafond gypsum m2 1.0000 35,153.50 35,153.50
JUMLAH HARGA BAHAN 88,453.50
C PERALATAN
alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 192,738.50


E Overhead & Profit 10.00% 19,273.85
F Harga Satuan Pekerjaaan (D+E) 212,012.35

4 Pemasangan 1 m² langit-langit gypsum board ukuran (120x240x9)mm. tebal 9mm + rangka hollow
lapis insulasi glasswool
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pas Rangka Hollow m2 1.0000 82,410.00 82,410.00
Upah pas. plafond gypsum m2 1.0000 16,875.00 16,875.00
Upah pasang glaswool m2 1.0000 10,000.00 10,000.00
JUMLAH TENAGA KERJA 109,285.00
B BAHAN
Rangka hollow m2 1.0000 53,300.00 53,300.00
Plafond gypsum m2 1.0000 28,574.00 28,574.00
glass wool t = 5cm m2 1.0000 30,000.00 30,000.00
Paku skrup kg 0.1100 40,000.00 4,400.00
JUMLAH HARGA BAHAN 116,274.00
C PERALATAN
alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 230,559.00


E Overhead & Profit 10.00% 23,055.90
F Harga Satuan Pekerjaaan (D+E) 253,614.90

HAL-1
5 Pemasangan 1 m² langit-langit gypsum board ukuran (120x240x9)mm. tebal 9mm + rangka hollow
lapis HPL
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pas Rangka Hollow m2 1.0000 82,410.00 82,410.00
Upah pas. plafond gypsum m2 1.0000 16,875.00 16,875.00
Upah pasang HPL m2 1.0000 25,000.00 25,000.00
JUMLAH TENAGA KERJA 124,285.00
B BAHAN
Rangka hollow m2 1.0000 53,300.00 53,300.00
Plafond gypsum m2 1.0000 88,453.50 88,453.50
HPL m2 1.0000 200,000.00 200,000.00
Lem fox kg 0.2500 125,000.00 31,250.00
JUMLAH HARGA BAHAN 373,003.50
C PERALATAN
alat bantu ls 1.000 10,000 10,000.00
JUMLAH HARGA ALAT 10,000.00

D Jumlah (A+B+C) 507,288.50


E Overhead & Profit 10.00% 50,728.85
F Harga Satuan Pekerjaaan (D+E) 558,017.35

6 Pemasangan 1 m² langit-langit gypsum sound proof ukuran (120x240x9)mm. tebal 9mm


+ rangka hollow lapis glass wool
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pas Rangka Hollow m2 1.0000 82,410.00 82,410.00
Upah pas. plafond gypsum m2 1.0000 16,875.00 16,875.00
kedap suara
Upah pasang glaswool m2 1.0000 10,000.00 10,000.00
JUMLAH TENAGA KERJA 109,285.00
B BAHAN
Rangka hollow m2 1.0000 53,300.00 53,300.00
Plafond gypsum sound proof lbr 0.3472 81,500.00 28,298.61
glass wool t = 5cm m2 1.0000 30,000.00 30,000.00
Paku skrup kg 0.1100 40,000.00 4,400.00
JUMLAH HARGA BAHAN 115,998.61
C PERALATAN
alat bantu ls 1.000 15,000 15,000.00
JUMLAH HARGA ALAT 15,000.00

D Jumlah (A+B+C) 240,283.61


E Overhead & Profit 10.00% 24,028.36
F Harga Satuan Pekerjaaan (D+E) 264,311.97

HAL-1
7 Pemasangan 1 m² langit-langit Kalsiboard 5mm rangka hollow
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pas Rangka Hollow m2 1.0000 82,410.00 82,410.00
Upah pas. plafond kalsiboard m2 1.0000 16,875.00 16,875.00
JUMLAH TENAGA KERJA 99,285.00
B BAHAN
Rangka hollow m2 1.0000 53,300.00 53,300.00
Plafond kalsiboard m2 1.0000 28,601.50 28,601.50
JUMLAH HARGA BAHAN 81,901.50
C PERALATAN
alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 186,186.50


E Overhead & Profit 10.00% 18,618.65
F Harga Satuan Pekerjaaan (D+E) 204,805.15

HAL-1
HARGA SATUAN PEKERJAAN PENGECATAN

1 Pengecatan 1 m² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0300 95,000.00 2,850.00
Tukang cat L.02 OH 0.0945 120,000.00 11,340.00
Kepala tukang L.03 OH 0.0095 130,000.00 1,228.50
Mandor L.04 OH 0.0045 145,000.00 652.50
JUMLAH TENAGA KERJA 16,071.00
B BAHAN
Plamuur ltr 0.1000 25,000.00 2,500.00
Cat dasar kg 0.1000 27,500.00 2,750.00
Cat finishing Kg 0.3500 50,000.00 17,500.00
Amplas Lbr 0.2600 3,000.00 780.00
JUMLAH HARGA BAHAN 23,530.00
C PERALATAN
Kuas 4" bh 0.250 5,000.00 1,250.00
Alat bantu ls 1.000 7,500.00 7,500.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 39,601.00


E Overhead & Profit 10.00% 3,960.10
F Harga Satuan Pekerjaaan (D+E) 43,561.10

2 Pengecatan 1 m² tembok luar (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0300 95,000.00 2,850.00
Tukang cat L.02 OH 0.0945 120,000.00 11,340.00
Kepala tukang L.03 OH 0.0095 130,000.00 1,228.50
Mandor L.04 OH 0.0045 145,000.00 652.50
JUMLAH TENAGA KERJA 16,071.00
B BAHAN
Plamuur ltr 0.1000 25,000.00 2,500.00
Cat dasar kg 0.1000 27,500.00 2,750.00
Cat finishing Kg 0.3500 65,000.00 22,750.00
Amplas Lbr 0.2600 3,000.00 780.00
JUMLAH HARGA BAHAN 28,780.00
C PERALATAN
Kuas 4" bh 0.250 5,000.00 1,250.00
Alat bantu ls 1.000 7,500.00 7,500.00
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 44,851.00


E Overhead & Profit 10.00% 4,485.10
F Harga Satuan Pekerjaaan (D+E) 49,336.10

HAL-1
3 Pengecatan 1 m² epoxi (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.1000 95,000.00 9,500.00
Tukang cat L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0095 130,000.00 1,228.50
Mandor L.04 OH 0.0045 145,000.00 652.50
JUMLAH TENAGA KERJA 35,381.00
B BAHAN
Plamuur ltr 0.1000 25,000.00 2,500.00
Cat dasar kg 0.1000 27,500.00 2,750.00
Cat epoxi Kg 0.3500 75,000.00 26,250.00
Tinner super ltr 0.3000 12,500.00 3,750.00
Amplas Lbr 0.2600 3,000.00 780.00
JUMLAH HARGA BAHAN 36,030.00
C PERALATAN
Kuas 4" bh 0.250 5,000.00 1,250.00
Alat bantu ls 1.000 7,500.00 7,500.00
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 71,411.00


E Overhead & Profit 10.00% 7,141.10
F Harga Satuan Pekerjaaan (D+E) 78,552.10

4 Pemasangan 1 m² wallpaper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0200 95,000.00 1,900.00
Tukang cat L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 130,000.00 2,600.00
Mandor L.04 OH 0.0025 145,000.00 362.50
JUMLAH TENAGA KERJA 28,862.50
B BAHAN
Wall paper m2 1.2000 60,000.00 72,000.00
Lem lbr 0.2000 125,000.00 25,000.00
JUMLAH HARGA BAHAN 97,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 125,862.50


E Overhead & Profit 10.00% 12,586.25
F Harga Satuan Pekerjaaan (D+E) 138,448.75

HAL-1
5 Pengecatan 1 m² permukaan baja dengan menie besi
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0200 95,000.00 1,900.00
Tukang cat L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 132,000.00 2,640.00
Mandor L.04 OH 0.0025 145,000.00 362.50
JUMLAH TENAGA KERJA 28,902.50
B BAHAN
Menie besi kg 0.1000 45,000.00 4,500.00
Kuas bh 0.0100 5,000.00 50.00
JUMLAH HARGA BAHAN 4,550.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 33,452.50


E Overhead & Profit 10.00% 3,345.25
F Harga Satuan Pekerjaaan (D+E) 36,797.75

HAL-1
ANALISA
PEKERJAAN MEP

1 Memasang 1 buah kloset duduk

A Bahan
- Klosed duduk 1.000 Bh x Rp. 2,550,000 = Rp.
- Perlengkapan 6% harga klosed x Rp. 2,550,000 = Rp.
Jumlah (A) = Rp.
B Tenaga
- Pekerja 1.200 Oh x Rp. 95,000 = Rp.
- Tukang batu 1.100 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.001 Oh x Rp. 130,000 = Rp.
- Mandor 0.060 Oh x Rp. 145,000 = Rp.
Jumlah (B) = Rp.
C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)

1 Memasang 1 buah Washtafel

A Bahan
- Washtafel 1.000 Bh x Rp. 1,250,000 = Rp.
- Perlengkapan 6% harga klosed x Rp. 1,250,000 = Rp.
Jumlah (A) = Rp.
B Tenaga
- Pekerja 3.300 Oh x Rp. 95,000 = Rp.
- Tukang batu 1.100 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.001 Oh x Rp. 130,000 = Rp.
- Mandor 0.160 Oh x Rp. 145,000 = Rp.
Jumlah (B) = Rp.
C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)
1 Memasang 1 buah Urinoir

A Bahan
- Urinoir 1.000 Bh x Rp. 2,705,000 = Rp.
- Perlengkapan 6% harga klosed x Rp. 2,705,000 = Rp.
Jumlah (A) = Rp.
B Tenaga
- Pekerja 3.300 Oh x Rp. 95,000 = Rp.
- Tukang batu 1.100 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.001 Oh x Rp. 130,000 = Rp.
- Mandor 0.160 Oh x Rp. 145,000 = Rp.
Jumlah (B) = Rp.
C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)

6.20. Memasang 1 m' pipa galvalium diameter 3/4"

A Bahan
- Pipa galvalium 3/4 1.200 M´ x Rp. 44,673 = Rp.
- Perlengkapan 35% Harga Pipa x Rp. 44,673 = Rp.
Jumlah (1) = Rp.
V Tenaga
- Pekerja 0.054 Oh x Rp. 95,000 = Rp.
- Tukang pipa 0.090 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp.
- Mandor 0.027 Oh x Rp. 145,000 = Rp.
Jumlah (2) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)
6.20. Memasang 1 m' pipa galvalium diameter 2"

A Bahan
- Pipa galvalium 3/4 1.200 M´ x Rp. 141,193 = Rp.
- Perlengkapan 35% Harga Pipa x Rp. 141,193 = Rp.
Jumlah (1) = Rp.
V Tenaga
- Pekerja 0.054 Oh x Rp. 95,000 = Rp.
- Tukang pipa 0.090 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp.
- Mandor 0.027 Oh x Rp. 145,000 = Rp.
Jumlah (2) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)

6.20. Memasang 1 m' pipa galvalium diameter 1.5"

A Bahan
- Pipa galvalium 3/4 1.200 M´ x Rp. 92,007 = Rp.
- Perlengkapan 35% Harga Pipa x Rp. 92,007 = Rp.
Jumlah (1) = Rp.
V Tenaga
- Pekerja 0.054 Oh x Rp. 95,000 = Rp.
- Tukang pipa 0.090 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp.
- Mandor 0.027 Oh x Rp. 145,000 = Rp.
Jumlah (2) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)
6.20. Memasang 1 m' pipa galvalium diameter 1"

A Bahan
- Pipa galvalium 3/4 1.200 M´ x Rp. 61,420 = Rp.
- Perlengkapan 35% Harga Pipa x Rp. 61,420 = Rp.
Jumlah (1) = Rp.
V Tenaga
- Pekerja 0.054 Oh x Rp. 95,000 = Rp.
- Tukang pipa 0.090 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp.
- Mandor 0.027 Oh x Rp. 145,000 = Rp.
Jumlah (2) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)

6.31. Memasang 1 m' pipa PVC tipe AW diameter 3"

A Bahan
- Pipa PVC 1.200 M´ x Rp. 36,000 = Rp.
- Perlengkapan 35% harga pipa x Rp. 36,000 = Rp.
Jumlah (1) = Rp.
B Tenaga
- Pekerja 0.081 Oh x Rp. 95,000 = Rp.
- Tukang Pipa 0.135 Oh x Rp. 12,000 = Rp.
- Kepala tukang 0.0135 Oh x Rp. 132,000 = Rp.
- Mandor 0.0041 Oh x Rp. 145,000 = Rp.
Jumlah (2) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)
6.32. Memasang 1 m' pipa PVC tipe AW diameter 4"
A Bahan
- Pipa PVC 1.200 M´ x Rp. 57,000 = Rp.
- Perlengkapan 35% harga pipa x Rp. 57,000 = Rp.
Jumlah (1) = Rp.
B Tenaga
- Pekerja 0.081 Oh x Rp. 95,000 = Rp.
- Tukang batu 0.135 Oh x Rp. 12,000 = Rp.
- Kepala tukang 0.0135 Oh x Rp. 132,000 = Rp.
- Mandor 0.0041 Oh x Rp. 145,000 = Rp.
Jumlah (2) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)

6.32. Memasang 1 m' pipa PVC tipe AW diameter 6"


A Bahan
- Pipa PVC 1.200 M´ x Rp. 127,000 = Rp.
- Perlengkapan 35% harga pipa x Rp. 127,000 = Rp.
Jumlah (1) = Rp.
B Tenaga
- Pekerja 0.081 Oh x Rp. 95,000 = Rp.
- Tukang batu 0.135 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.0135 Oh x Rp. 130,000 = Rp.
- Mandor 0.0041 Oh x Rp. 145,000 = Rp.
Jumlah (2) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)
6.34. Memasang 1 bh bak cuci piring

A Bahan
- Bak cuci teraso 1.000 Bh x Rp. 750,000 = Rp.
- Water drain + asesories 1.000 Bh x Rp. 36,000 = Rp.
- Semen portland 20.000 Kg x Rp. 1,520 = Rp.
- Pasir 0.050 M³ x Rp. 115,000 = Rp.
Jumlah (A) = Rp.
B Tenaga
- Pekerja 0.050 Oh x Rp. 95,000 = Rp.
- Tukang batu 0.500 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.050 Oh x Rp. 132,000 = Rp.
- Mandor 0.0025 Oh x Rp. 145,000 = Rp.
Jumlah (B) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)

6.35. Memasang 1 bh kran diameter ¾" atau ½"

A Bahan
- Kran air 1.000 Bh x Rp. 85,500 = Rp.
- Seal tape 0.025 Bh x Rp. 4,500 = Rp.
Jumlah (1) = Rp.

B Tenaga
- Pekerja 0.010 Oh x Rp. 95,000 = Rp.
- Tukang Pipa 0.100 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.010 Oh x Rp. 132,000 = Rp.
- Mandor 0.005 Oh x Rp. 145,000 = Rp.
Jumlah (2)

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)
6.35. Memasang 1 bh kran leher angsa

A Bahan
- Kran Leher angsa 1.000 Bh x Rp. 127,000 = Rp.
- Seal tape 0.025 Bh x Rp. 4,500 = Rp.
Jumlah (1) = Rp.

B Tenaga
- Pekerja 0.010 Oh x Rp. 95,000 = Rp.
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.010 Oh x Rp. 132,000 = Rp.
- Mandor 0.005 Oh x Rp. 145,000 = Rp.
Jumlah (2)

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)

6.36. Memasang 1 bh Floor drain

A Bahan
- Floor drain 1.000 Bh x Rp. 21,000 = Rp.
Jumlah (1) = Rp.

B Tenaga
- Pekerja 0.010 Oh x Rp. 95,000 = Rp.
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp.
- Kepala tukang 0.010 Oh x Rp. 132,000 = Rp.
- Mandor 0.005 Oh x Rp. 145,000 = Rp.
Jumlah (2)

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)
7.1 1 Bh Pasangan Stop Kontak

A Bahan
- Stop Kontak 1.0000 Bh x Rp. 29,500.00 = Rp.
Jumlah (1) = Rp.
B Tenaga
- Pekerja 0.200 Oh x Rp. 95,000.00 = Rp.
- Tukang Listrik 0.020 Oh x Rp. 120,000.00 = Rp.
- Kepala tukang Listrik 0.010 Oh x Rp. 130,000.00 = Rp.
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp.
Jumlah (2) = Rp.
C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)

7.3 1 Bh Pasangan Saklar Ganda

7.3.1 Bahan
- Saklar Ganda 1.0000 Bh x Rp. 36,500.00 = Rp.
Jumlah (1) = Rp.
7.3.2 Tenaga
- Pekerja 0.400 Oh x Rp. 95,000.00 = Rp.
- Tukang Listrik 0.040 Oh x Rp. 120,000.00 = Rp.
- Kepala tukang Listrik 0.010 Oh x Rp. 130,000.00 = Rp.
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp.
Jumlah (2) = Rp.
C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)
7.4 1 Bh Pasangan Saklar Tunggal

A Bahan
- Saklar Tunggal 1.0000 Bh x Rp. 26,000.00 = Rp.
Jumlah (1) = Rp.
B Tenaga
- Pekerja 0.400 Oh x Rp. 95,000.00 = Rp.
- Tukang Listrik 0.040 Oh x Rp. 120,000.00 = Rp.
- Kepala tukang Listrik 0.010 Oh x Rp. 130,000.00 = Rp.
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp.
Jumlah (2) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)

7.5 1 Bh Pasangan Mcb

A Bahan
- MCB 1.0000 Bh x Rp. 45,500.00 = Rp.
Jumlah (1) = Rp.
B Tenaga
- Pekerja 0.400 Oh x Rp. 95,000.00 = Rp.
- Tukang Listrik 0.040 Oh x Rp. 120,000.00 = Rp.
- Kepala tukang Listrik 0.040 Oh x Rp. 130,000.00 = Rp.
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp.
Jumlah (2) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)
7.5 A 1 Bh Pasangan Titik Lampu DL

A Bahan
- #REF! 1.0000 Bh x Rp. 61,500.00 = Rp.
- Pipa pvc 2.2000 m' x Rp. 1,153.85 = Rp.
- Kabel NYA 3 X 2.5 11.1000 M' x Rp. 12,850.00 = Rp.
Jumlah (1) = Rp.
B Tenaga
- Pekerja 0.200 Oh x Rp. 95,000.00 = Rp.
- Tukang Listrik 0.020 Oh x Rp. 120,000.00 = Rp.
- Kepala tukang Listrik 0.020 Oh x Rp. 130,000.00 = Rp.
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp.
Jumlah (2) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)

7.5 B 1 Bh Pasangan Titik Lampu RM

7.5.1 Bahan
RM 300 GLOSS ALML
- 1.0000 Bh x Rp. 225,000.00 = Rp.
Reflektor 2x 18 W
- Pipa pvc 2.2000 m' x Rp. 1,153.85 = Rp.
- Kabel NYA 3 X 2.5 11.1000 M' x Rp. 12,850.00 = Rp.
Jumlah (1) = Rp.
7.5.2 Tenaga
- Pekerja 0.200 Oh x Rp. 95,000.00 = Rp.
- Tukang Listrik 0.020 Oh x Rp. 120,000.00 = Rp.
- Kepala tukang Listrik 0.020 Oh x Rp. 130,000.00 = Rp.
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp.
Jumlah (2) = Rp.

C PERALATAN
Katrol electrik
Jumlah (C) = Rp.

D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaaan (D+E)

7.5 C 1 Bh Pasangan Titik Lampu

7.5.1 Bahan
- Fitting TL 1.0000 Bh x Rp. 134,500.00 = Rp.
- Pipa pvc 2.2000 m' x Rp. 21,794.87 = Rp.
- Kabel NYA 3 X 2.5 11.1000 M' x Rp. 12,850.00 = Rp.
Jumlah (1) = Rp.
7.5.2 Tenaga
- Pekerja 0.200 Oh x Rp. 95,000.00 = Rp.
- Tukang Listrik 0.020 Oh x Rp. 120,000.00 = Rp.
- Kepala tukang Listrik 0.020 Oh x Rp. 130,000.00 = Rp.
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2) = Rp.

7.6 Pemasangan Instalasi Pelaluan Arde Panel Meter

7.6.1 Bahan
- Pipa PVC Pelaluan Arde Dim 2.0000 Btg x Rp. 14,500.00 = Rp.
- Keni Pipa PVC 1/2" (Putih) 2.0000 Bh x Rp. 4,000.00 = Rp.
- Kabel 10 mm 2.2000 m' x Rp. 8,340.00 = Rp.
Jumlah (1) = Rp.
7.5.2 Tenaga
- Pekerja 0.300 Oh x Rp. 95,000.00 = Rp.
- Tukang Listrik 0.036 Oh x Rp. 120,000.00 = Rp.
- Kepala tukang Listrik 0.030 Oh x Rp. 130,000.00 = Rp.
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2) = Rp.
2,550,000.00
153,000.00
2,703,000.00

114,000.00
132,000.00
130.00
8,700.00
254,830.00

0.00

2,957,830.00
295,783.00
3,253,613.00

1,250,000.00
75,000.00
1,325,000.00

313,500.00
132,000.00
130.00
23,200.00
468,830.00

0.00

1,793,830.00
179,383.00
1,973,213.00
2,705,000.00
162,300.00
2,867,300.00

313,500.00
132,000.00
130.00
23,200.00
468,830.00

0.00

3,336,130.00
333,613.00
3,669,743.00

53,608.00
15,635.67
69,243.67

5,130.00
10,800.00
1,170.00
3,915.00
21,015.00

0.00

90,258.67
9,025.87
99,284.53
169,432.00
49,417.67
218,849.67

5,130.00
10,800.00
1,170.00
3,915.00
21,015.00

0.00

239,864.67
23,986.47
263,851.13

110,408.00
32,202.33
142,610.33

5,130.00
10,800.00
1,170.00
3,915.00
21,015.00

0.00

163,625.33
16,362.53
179,987.87
73,704.00
21,497.00
95,201.00

5,130.00
10,800.00
1,170.00
3,915.00
21,015.00

0.00

116,216.00
11,621.60
127,837.60

43,200.00
12,600.00
55,800.00

7,695.00
1,620.00
1,782.00
594.50
11,691.50

0.00

67,491.50
6,749.15
74,240.65
68,400.00
19,950.00
88,350.00

7,695.00
1,620.00
1,782.00
594.50
11,691.50

0.00

100,041.50
10,004.15
110,045.65

152,400.00
44,450.00
196,850.00

7,695.00
16,200.00
1,755.00
594.50
26,244.50

0.00

223,094.50
22,309.45
245,403.95
750,000.00
36,000.00
30,400.00
5,750.00
822,150.00

4,750.00
60,000.00
6,600.00
362.50
71,712.50

0.00

893,862.50
89,386.25
983,248.75

85,500.00
112.50
85,612.50

950.00
12,000.00
1,320.00
725.00
14,995.00

0.00

100,607.50
10,060.75
110,668.25
127,000.00
112.50
127,112.50

950.00
12,000.00
1,320.00
725.00
14,995.00

0.00

142,107.50
14,210.75
156,318.25

21,000.00
21,000.00

950.00
12,000.00
1,320.00
725.00
14,995.00

0.00

35,995.00
3,599.50
39,594.50
29,500.00
29,500.00

19,000.00
2,400.00
1,300.00
1,450.00
24,150.00

0.00

53,650.00
5,365.00
59,015.00

36,500.00
36,500.00

38,000.00
4,800.00
1,300.00
1,450.00
45,550.00

0.00

82,050.00
8,205.00
90,255.00
26,000.00
26,000.00

38,000.00
4,800.00
1,300.00
1,450.00
45,550.00

0.00

71,550.00
7,155.00
78,705.00

45,500.00
45,500.00

38,000.00
4,800.00
5,200.00
1,450.00
49,450.00

0.00

94,950.00
9,495.00
104,445.00
61,500.00
2,538.46
142,635.00
206,673.46

19,000.00
2,400.00
2,600.00
1,450.00
25,450.00

0.00

232,123.46
23,212.35
255,335.81

225,000.00

2,538.46
142,635.00
370,173.46

19,000.00
2,400.00
2,600.00
1,450.00
25,450.00

0.00

395,623.46
39,562.35
435,185.81

134,500.00
47,948.72
142,635.00
325,083.72

19,000.00
2,400.00
2,600.00
1,450.00
25,450.00
350,533.72

29,000.00
8,000.00
18,348.00
55,348.00

28,500.00
4,320.00
3,900.00
1,450.00
38,170.00
93,518.00
HARGA SATUAN PEKERJAAN KUNCI DAN KACA

1 Pemasangan 1 buah kunci tanam antik


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0600 95,000.00 5,700.00
Tukang kayu L.02 OH 0.6000 120,000.00 72,000.00
Kepala tukang L.03 OH 0.0600 130,000.00 7,800.00
Mandor L.04 OH 0.0030 145,000.00 435.00
JUMLAH TENAGA KERJA 85,935.00
B BAHAN
Kunci tanam antik bh 1.0000 450,000.00 450,000.00
JUMLAH HARGA BAHAN 450,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 535,935.00


E Overhead & Profit 10.00% 53,593.50
F Harga Satuan Pekerjaaan (D+E) 589,528.50

2 Pemasangan 1 buah kunci tanam biasa


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0100 95,000.00 950.00
Tukang kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala tukang L.03 OH 0.0500 130,000.00 6,500.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 68,175.00
B BAHAN
Kunci tanam biasa bh 1.0000 203,500.00 203,500.00
JUMLAH HARGA BAHAN 203,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 271,675.00


E Overhead & Profit 10.00% 27,167.50
F Harga Satuan Pekerjaaan (D+E) 298,842.50

3 Pemasangan 1 buah kunci kamar mandi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0050 95,000.00 475.00
Tukang kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala tukang L.03 OH 0.0500 130,000.00 6,500.00
Mandor L.04 OH 0.0030 145,000.00 435.00
JUMLAH TENAGA KERJA 67,410.00
B BAHAN
Kunci tanam KM bh 1.0000 125,000.00 125,000.00
JUMLAH HARGA BAHAN 125,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 192,410.00


E Overhead & Profit 10.00% 19,241.00
F Harga Satuan Pekerjaaan (D+E) 211,651.00

hal-78
4 Pemasangan 1 buah kunci silinder
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0050 95,000.00 475.00
Tukang kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala tukang L.03 OH 0.0500 130,000.00 6,500.00
Mandor L.04 OH 0.0030 145,000.00 435.00
JUMLAH TENAGA KERJA 67,410.00
B BAHAN
Kunci Alumunium bh 1.0000 375,000.00 375,000.00
JUMLAH HARGA BAHAN 375,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 442,410.00


E Overhead & Profit 10.00% 44,241.00
F Harga Satuan Pekerjaaan (D+E) 486,651.00

5 Pemasangan 1 pasang Handle


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0050 95,000.00 475.00
Tukang kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala tukang L.03 OH 0.0500 130,000.00 6,500.00
Mandor L.04 OH 0.0030 145,000.00 435.00
JUMLAH TENAGA KERJA 67,410.00
B BAHAN
Handel ps 1.0000 350,000.00 350,000.00
JUMLAH HARGA BAHAN 350,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 417,410.00


E Overhead & Profit 10.00% 41,741.00
F Harga Satuan Pekerjaaan (D+E) 459,151.00

6 Pemasangan 1 buah kunci Alumunium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0100 95,000.00 950.00
Tukang kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala tukang L.03 OH 0.0500 130,000.00 6,500.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 68,175.00
B BAHAN
Kunci Alumunium bh 1.0000 350,000.00 350,000.00
JUMLAH HARGA BAHAN 350,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 418,175.00


E Overhead & Profit 10.00% 41,817.50
F Harga Satuan Pekerjaaan (D+E) 459,992.50

hal-79
7 Pemasangan 1 buah engsel pintu
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0150 95,000.00 1,425.00
Tukang kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala tukang L.03 OH 0.0150 130,000.00 1,950.00
Mandor L.04 OH 0.0008 145,000.00 116.00
JUMLAH TENAGA KERJA 21,491.00
B BAHAN
Engsel pintu bh 1.0000 36,200.00 36,200.00
JUMLAH HARGA BAHAN 36,200.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 57,691.00


E Overhead & Profit 10.00% 5,769.10
F Harga Satuan Pekerjaaan (D+E) 63,460.10

8 Pemasangan 1 buah engsel pintu alumunium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0150 95,000.00 1,425.00
Tukang alumunium L.02 OH 0.1500 120,000.00 18,000.00
Kepala tukang L.03 OH 0.0150 130,000.00 1,950.00
Mandor L.04 OH 0.0008 145,000.00 116.00
JUMLAH TENAGA KERJA 21,491.00
B BAHAN
Engsel pintu bh 1.0000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,491.00


E Overhead & Profit 10.00% 4,649.10
F Harga Satuan Pekerjaaan (D+E) 51,140.10

9 Pemasangan 1 buah engsel jendela aluminium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 95,000.00 950.00
Tukang kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0005 145,000.00 72.50
JUMLAH TENAGA KERJA 14,322.50
B BAHAN
Engsel alumunium bh 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN
Alat bantu ls 1.000 2500 2,500.00
JUMLAH HARGA ALAT 2,500.00

D Jumlah (A+B+C) 36,822.50


E Overhead & Profit 10.00% 3,682.25
F Harga Satuan Pekerjaaan (D+E) 40,504.75

hal-80
10 Pemasangan 1 buah engsel angin
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0100 95,000.00 950.00
Tukang kayu L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 130,000.00 2,600.00
Mandor L.04 OH 0.0005 145,000.00 72.50
JUMLAH TENAGA KERJA 27,622.50
B BAHAN
Engsel angin bh 1.0000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 62,622.50


E Overhead & Profit 10.00% 6,262.25
F Harga Satuan Pekerjaaan (D+E) 68,884.75

11 Pemasangan 1 buah Hak angin


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0150 95,000.00 1,425.00
Tukang kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala tukang L.03 OH 0.0150 130,000.00 1,950.00
Mandor L.04 OH 0.0080 145,000.00 1,160.00
JUMLAH TENAGA KERJA 22,535.00
B BAHAN
Hak angin bh 1.0000 15,700.00 15,700.00
JUMLAH HARGA BAHAN 15,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 38,235.00


E Overhead & Profit 10.00% 3,823.50
F Harga Satuan Pekerjaaan (D+E) 42,058.50

12 Pemasangan 1 buah door closer


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0500 95,000.00 4,750.00
Tukang kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala tukang L.03 OH 0.0500 130,000.00 6,500.00
Mandor L.04 OH 0.0030 145,000.00 435.00
JUMLAH TENAGA KERJA 71,685.00
B BAHAN
Door closer set 1.0000 275,000.00 275,000.00
JUMLAH HARGA BAHAN 275,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 346,685.00


E Overhead & Profit 10.00% 34,668.50
F Harga Satuan Pekerjaaan (D+E) 381,353.50

hal-81
13 Pemasangan 1 buah kunci slot
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0200 95,000.00 1,900.00
Tukang kayu L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 130,000.00 2,600.00
Mandor L.04 OH 0.0010 145,000.00 145.00
JUMLAH TENAGA KERJA 28,645.00
B BAHAN
Kunci slot bh 1.0000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 63,645.00


E Overhead & Profit 10.00% 6,364.50
F Harga Satuan Pekerjaaan (D+E) 70,009.50

14 Pemasangan 1 buah Door holder


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0500 95,000.00 4,750.00
Tukang kayu L.02 OH 0.5000 120,000.00 60,000.00
Kepala tukang L.03 OH 0.0500 130,000.00 6,500.00
Mandor L.04 OH 0.0030 145,000.00 435.00
JUMLAH TENAGA KERJA 71,685.00
B BAHAN
Door holder bh 1.0000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 100,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 171,685.00


E Overhead & Profit 10.00% 17,168.50
F Harga Satuan Pekerjaaan (D+E) 188,853.50

15 Pemasangan 1 buah Door stop


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0100 95,000.00 950.00
Tukang kayu L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0100 130,000.00 1,300.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 14,975.00
B BAHAN
Door stop bh 1.0000 12,500.00 12,500.00
JUMLAH HARGA BAHAN 12,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 27,475.00


E Overhead & Profit 10.00% 2,747.50
F Harga Satuan Pekerjaaan (D+E) 30,222.50

hal-82
16 Pemasangan 1 m² kaca tebal 5 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0150 95,000.00 1,425.00
Tukang kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala tukang L.03 OH 0.0150 130,000.00 1,950.00
Mandor L.04 OH 0.0008 145,000.00 116.00
JUMLAH TENAGA KERJA 21,491.00
B BAHAN
Kaca tebal 5 mm bening m2 1.1000 109,800.00 120,780.00
Sealent kg 0.0500 35,000.00 1,750.00
JUMLAH HARGA BAHAN 122,530.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 144,021.00


E Overhead & Profit 10.00% 14,402.10
F Harga Satuan Pekerjaaan (D+E) 158,423.10

17 Pemasangan 1 m² kaca tebal 8 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0170 95,000.00 1,615.00
Tukang kayu L.02 OH 0.1700 120,000.00 20,400.00
Kepala tukang L.03 OH 0.0170 130,000.00 2,210.00
Mandor L.04 OH 0.0009 145,000.00 130.50
JUMLAH TENAGA KERJA 24,355.50
B BAHAN
Kaca tebal 8 mm m2 1.1000 229,900.00 252,890.00
Sealent kg 0.0700 35,000.00 2,450.00
JUMLAH HARGA BAHAN 255,340.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 279,695.50


E Overhead & Profit 10.00% 27,969.55
F Harga Satuan Pekerjaaan (D+E) 307,665.05

18 Pemasangan 1 m² kaca tebal 10 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0250 95,000.00 2,375.00
Tukang kayu L.02 OH 0.2500 120,000.00 30,000.00
Kepala tukang L.03 OH 0.0250 130,000.00 3,250.00
Mandor L.04 OH 0.0013 145,000.00 188.50
JUMLAH TENAGA KERJA 35,813.50
B BAHAN
Kaca tebal 10 mm temper m2 1.1000 1,250,000.00 1,375,000.00
Sealent kg 0.0700 35,000.00 2,450.00
JUMLAH HARGA BAHAN 1,377,450.00
C PERALATAN
Alat bantu ls 1.000 75,000 75,000.00
JUMLAH HARGA ALAT 75,000.00

D Jumlah (A+B+C) 1,488,263.50


E Overhead & Profit 10.00% 148,826.35
F Harga Satuan Pekerjaaan (D+E) 1,637,089.85

hal-83
19 Pemasangan 1 m² kaca buram tebal 12 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0250 95,000.00 2,375.00
Tukang kayu L.02 OH 0.2500 120,000.00 30,000.00
Kepala tukang L.03 OH 0.0250 130,000.00 3,250.00
Mandor L.04 OH 0.0013 145,000.00 188.50
JUMLAH TENAGA KERJA 35,813.50
B BAHAN
Kaca tebal 12 mm m2 1.1000 750,000.00 825,000.00
Sealent kg 0.0700 35,000.00 2,450.00
JUMLAH HARGA BAHAN 827,450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 863,263.50


E Overhead & Profit 10.00% 86,326.35
F Harga Satuan Pekerjaaan (D+E) 949,589.85

20 Pemasangan 1 m² kaca cermin tebal 5 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0150 95,000.00 1,425.00
Tukang kayu L.02 OH 0.1500 120,000.00 18,000.00
Kepala tukang L.03 OH 0.0150 130,000.00 1,950.00
Mandor L.04 OH 0.0080 145,000.00 1,160.00
JUMLAH TENAGA KERJA 22,535.00
B BAHAN
Kaca cermin tebal 5 mm m2 1.1000 200,000.00 220,000.00
JUMLAH HARGA BAHAN 220,000.00
C PERALATAN

JUMLAH HARGA ALAT 220,000.00

D Jumlah (A+B+C) 462,535.00


E Overhead & Profit 10.00% 46,253.50
F Harga Satuan Pekerjaaan (D+E) 508,788.50

21 Pemasangan Partisi kaca 5mm rangka alumunium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0150 95,000.00 1,425.00
Tukang alumunium L.02 OH 0.1500 120,000.00 18,000.00
Kepala tukang L.03 OH 0.0150 130,000.00 1,950.00
Mandor L.04 OH 0.0008 145,000.00 116.00
Upah pas alumunium m' 3.0000 10,108.50 30,325.50
JUMLAH TENAGA KERJA 51,816.50
B BAHAN
Alumunium 4" m' 3.0000 127,500.00 382,500.00
Kaca tebal 5 mm m2 1.1000 109,800.00 120,780.00
Sealent kg 0.0500 35,000.00 1,750.00
JUMLAH HARGA BAHAN 505,030.00
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 564,346.50


E Overhead & Profit 10.00% 56,434.65
F Harga Satuan Pekerjaaan (D+E) 620,781.15

hal-84
22 Pemasangan dinding kaca curtain wall 5mm rangka alumunium
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0300 95,000.00 2,850.00
Tukang alumunium L.02 OH 0.5000 120,000.00 60,000.00
Kepala tukang L.03 OH 0.0300 130,000.00 3,900.00
Mandor L.04 OH 0.0016 145,000.00 232.00
JUMLAH TENAGA KERJA 66,982.00
B BAHAN
Aluminium rangka tegak m' 2.0000 85,000.00 170,000.00
Alumunium profil rangka datar m' 2.0000 65,000.00 130,000.00
Kaca tebal 5 mm setara panasap m2 1.1000 275,000.00 302,500.00
Sealent kg 0.0500 35,000.00 1,750.00
JUMLAH HARGA BAHAN 604,250.00
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
Scafholding ls 1.000 12,500 12,500.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 691,232.00


E Overhead & Profit 10.00% 69,123.20
F Harga Satuan Pekerjaaan (D+E) 760,355.20

23 Pemasangan dinding kaca curtain wall 8mm rangka alumunium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0300 95,000.00 2,850.00
Tukang alumunium L.02 OH 0.5000 120,000.00 60,000.00
Kepala tukang L.03 OH 0.0300 130,000.00 3,900.00
Mandor L.04 OH 0.0016 145,000.00 232.00
JUMLAH TENAGA KERJA 66,982.00
B BAHAN
Aluminium rangka tegak m' 2.0000 85,000.00 170,000.00
Alumunium profil rangka datar m' 2.0000 65,000.00 130,000.00
Kaca tebal 8 mm panasap m2 1.1000 500,000.00 550,000.00
Sealent kg 0.0500 35,000.00 1,750.00
JUMLAH HARGA BAHAN 851,750.00
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
Scafholding ls 1.000 12,500 12,500.00
JUMLAH HARGA ALAT 20,000.00
D Jumlah (A+B+C) 938,732.00
E Overhead & Profit 10.00% 93,873.20
F Harga Satuan Pekerjaaan (D+E) 1,032,605.20

hal-85
24 Pemasangan dinding kaca curtain wall 10mm rangka alumunium
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien (Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0300 95,000.00 2,850.00
Tukang alumunium L.02 OH 0.5000 120,000.00 60,000.00
Kepala tukang L.03 OH 0.0300 130,000.00 3,900.00
Mandor L.04 OH 0.0016 145,000.00 232.00
JUMLAH TENAGA KERJA 66,982.00
B BAHAN
Aluminium rangka tegak m' 2.0000 250,000.00 500,000.00
Alumunium profil rangka datar m' 2.0000 65,000.00 130,000.00
Kaca tebal 10 mm panasap m2 1.1000 1,250,000.00 1,375,000.00
Sealent kg 0.0500 35,000.00 1,750.00
JUMLAH HARGA BAHAN 2,006,750.00
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
Scafholding ls 1.000 12,500 12,500.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 2,093,732.00


E Overhead & Profit 10.00% 209,373.20
F Harga Satuan Pekerjaaan (D+E) 2,303,105.20

25 Pemasangan jendela kaca rangka alumunium type J1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah pas kusen alumunium m' 13.8500 10,108.50 140,002.73
Upah pas. Rangka jendela m' 6.8000 10,108.50 68,737.80
Upah pas. Kaca m2 3.3150 21,491.00 71,242.67
Upah pasang hak angin bh 2.0000 22,535.00 45,070.00
Upah pasang grendel bh 2.0000 10,000.00 20,000.00
Upah pasang engsel jendela bh 4.0000 14,322.50 57,290.00
JUMLAH TENAGA KERJA 402,343.19
B BAHAN
Alumunium kusen jendela m' 13.8500 142,950.00 1,979,857.50
Alumunium rangka jendela m' 6.8000 112,500.00 765,000.00
Kaca tebal 5 mm m2 3.3150 122,530.00 406,186.95
Hak angin ps 2.0000 35,000.00 70,000.00
Grendel bh 2.0000 10,450.00 20,900.00
Engsel jendela bh 4.0000 21,000.00 84,000.00
Sealent tube 0.5000 35,000.00 17,500.00
JUMLAH HARGA BAHAN 3,343,444.45
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
Scafholding ls 1.000 12,500 12,500.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 3,765,787.64


E Overhead & Profit 10.00% 376,578.76
F Harga Satuan Pekerjaaan (D+E) 4,142,366.40

hal-86
26 Pemasangan jendela kaca rangka alumunium type J2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah pas kusen alumunium m' 8.2000 10,108.50 82,889.70
Upah pas. Rangka jendela m' 8.4000 10,108.50 84,911.40
Upah pas. Kaca m2 1.0000 21,491.00 21,491.00
Upah pasang hak angin bh 3.0000 22,535.00 67,605.00
Upah pasang grendel bh 3.0000 10,000.00 30,000.00
Upah pasang engsel jendela bh 6.0000 14,322.50 85,935.00
JUMLAH TENAGA KERJA 372,832.10
B BAHAN
Alumunium kusen jendela m' 8.2000 142,950.00 1,172,190.00
Alumunium rangka jendela m' 8.4000 112,500.00 945,000.00
Kaca tebal 5 mm m2 1.0000 122,530.00 122,530.00
Hak angin ps 3.0000 35,000.00 105,000.00
Grendel bh 3.0000 10,450.00 31,350.00
Engsel jendela bh 6.0000 21,000.00 126,000.00
Sealent tube 0.5000 35,000.00 17,500.00
JUMLAH HARGA BAHAN 2,519,570.00
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
Scafholding ls 1.000 12,500 12,500.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 2,912,402.10


E Overhead & Profit 10.00% 291,240.21
F Harga Satuan Pekerjaaan (D+E) 3,203,642.31

27 Pemasangan jendela kaca rangka alumunium type J3


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah pas kusen alumunium m' 13.8500 10,108.50 140,002.73
Upah pas. Kaca m2 2.5150 21,491.00 54,049.87
JUMLAH TENAGA KERJA 194,052.59
B BAHAN
Alumunium kusen jendela m' 13.8500 142,950.00 1,979,857.50
Kaca tebal 5 mm m2 2.5150 122,530.00 308,162.95
Sealent tube 1.0000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 2,323,020.45
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
Scafholding ls 1.000 12,500 12,500.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 2,537,073.04


E Overhead & Profit 10.00% 253,707.30
F Harga Satuan Pekerjaaan (D+E) 2,790,780.34

Pemasangan jendela kaca rangka alumunium type J4


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah pas kusen alumunium m' 4.5000 10,108.50 45,488.25
Upah pas. Kaca m2 0.6000 21,491.00 12,894.60
JUMLAH TENAGA KERJA 58,382.85
B BAHAN
Alumunium kusen jendela m' 4.5000 142,950.00 643,275.00
Kaca tebal 5 mm m2 0.6000 122,530.00 73,518.00
Sealent tube 1.0000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 751,793.00
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
Scafholding ls 1.000 12,500 12,500.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 830,175.85

hal-87
E Overhead & Profit 10.00% 83,017.59
F Harga Satuan Pekerjaaan (D+E) 913,193.44

Pemasangan jendela kaca rangka alumunium type J5


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah pas kusen alumunium m' 10.8000 10,108.50 109,171.80
Upah pas. Kaca m2 1.8000 21,491.00 38,683.80
JUMLAH TENAGA KERJA 147,855.60
B BAHAN
Alumunium kusen jendela m' 10.8000 142,950.00 1,543,860.00
Kaca tebal 5 mm m2 1.8000 122,530.00 220,554.00
Sealent tube 1.0000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 1,799,414.00
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
Scafholding ls 1.000 12,500 12,500.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 1,967,269.60


E Overhead & Profit 10.00% 196,726.96
F Harga Satuan Pekerjaaan (D+E) 2,163,996.56

Pemasangan jendela kaca rangka alumunium type J6


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah pas kusen alumunium m' 2.2000 10,108.50 22,238.70
Upah pas. Rangka jendela m' 1.6000 10,108.50 16,173.60
Upah pas. Kaca m2 0.0900 21,491.00 1,934.19
Upah pasang hak angin bh 1.0000 22,535.00 22,535.00
Upah pasang grendel bh 1.0000 10,000.00 10,000.00
Upah pasang engsel jendela bh 2.0000 14,322.50 28,645.00
JUMLAH TENAGA KERJA 101,526.49
B BAHAN
Alumunium kusen jendela m' 2.2000 142,950.00 314,490.00
Alumunium rangka jendela m' 1.6000 112,500.00 180,000.00
Kaca tebal 5 mm m2 0.0900 122,530.00 11,027.70
Hak angin ps 1.0000 35,000.00 35,000.00
Grendel bh 1.0000 10,450.00 10,450.00
Engsel jendela bh 2.0000 21,000.00 42,000.00
Sealent tube 0.5000 35,000.00 17,500.00
JUMLAH HARGA BAHAN 610,467.70
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
Scafholding ls 1.000 12,500 12,500.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 731,994.19


E Overhead & Profit 10.00% 73,199.42
F Harga Satuan Pekerjaaan (D+E) 805,193.61

Pemasangan jendela kaca rangka alumunium Ventilasi type 1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah pas kusen alumunium m' 2.4000 10,108.50 24,260.40
Upah pas. Rangka jendela m' 1.8000 10,108.50 18,195.30
Upah pas. Kaca m2 0.1200 21,491.00 2,578.92
Upah pasang hak angin bh 1.0000 22,535.00 22,535.00
Upah pasang grendel bh 1.0000 10,000.00 10,000.00
Upah pasang engsel jendela bh 2.0000 14,322.50 28,645.00
JUMLAH TENAGA KERJA 106,214.62
B BAHAN
Alumunium kusen jendela m' 2.4000 142,950.00 343,080.00
Alumunium rangka jendela m' 1.8000 112,500.00 202,500.00
Kaca tebal 5 mm m2 0.1200 122,530.00 14,703.60
Hak angin ps 1.0000 35,000.00 35,000.00

hal-88
Grendel bh 1.0000 10,450.00 10,450.00
Engsel jendela bh 2.0000 21,000.00 42,000.00
Sealent tube 0.5000 35,000.00 17,500.00
JUMLAH HARGA BAHAN 665,233.60
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
Scafholding ls 1.000 12,500 12,500.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 791,448.22


E Overhead & Profit 10.00% 79,144.82
F Harga Satuan Pekerjaaan (D+E) 870,593.04

hal-89
Pemasangan Pintu rangka alumunium type P10
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Kusen Alumunium m' 4.4000 10,108.50 44,477.40
Upah daun Pintu m' 0.9000 70,595.00 63,535.50
Upah pasang engsel bh 2.0000 21,491.00 42,982.00
Upah Handel Pintu Alumunium ps 0.0000 67,410.00 -
Upah pasang Kunci Alumunium bh 1.0000 68,175.00 68,175.00
JUMLAH TENAGA KERJA 219,169.90
B BAHAN
Alumunium kusen pintu m' 4.4000 142,950.00 628,980.00
Pintu alumunium m2 0.9000 748,860.00 673,974.00
Sealent tube 0.5000 35,000.00 17,500.00
Engsel Alumunium bh 2.0000 25,000.00 50,000.00
Handel Pintu ps 0.0000 350,000.00 -
Kunci Alumunium bh 1.0000 350,000.00 350,000.00
JUMLAH HARGA BAHAN 1,720,454.00
C PERALATAN
Alat bantu ls 1.000 15,000 15,000.00
JUMLAH HARGA ALAT 15,000.00

D Jumlah (A+B+C) 1,954,623.90


E Overhead & Profit 10.00% 195,462.39
F Harga Satuan Pekerjaaan (D+E) 2,150,086.29

Pemasangan Pintu kaca rangka alumunium type P11


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah pas kusen alumunium m' 2.4000 10,108.50 24,260.40
Upah pas. Rangka pintu m' 3.8000 10,108.50 38,412.30
Upah pas. Kaca m2 0.5200 21,491.00 11,175.32
Upah pasang hak angin bh 1.0000 22,535.00 22,535.00
Upah pasang grendel bh 1.0000 10,000.00 10,000.00
Upah pasang engsel bh 2.0000 14,322.50 28,645.00
JUMLAH TENAGA KERJA 135,028.02
B BAHAN
Alumunium kusen m' 2.4000 142,950.00 343,080.00
Alumunium rangka m' 3.8000 112,500.00 427,500.00
Kaca tebal 5 mm m2 0.5200 122,530.00 63,715.60
Hak angin ps 1.0000 35,000.00 35,000.00
Grendel bh 1.0000 10,450.00 10,450.00
Engsel bh 2.0000 21,000.00 42,000.00
Sealent tube 0.5000 35,000.00 17,500.00
JUMLAH HARGA BAHAN 939,245.60
C PERALATAN
Alat Pemotong ls 1.000 7,500 7,500.00
Scafholding ls 1.000 12,500 12,500.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 1,094,273.62


E Overhead & Profit 10.00% 109,427.36
F Harga Satuan Pekerjaaan (D+E) 1,203,700.98

hal-90
30 Pemasangan Partisi Gypsum rangka rangka metal stud
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0150 95,000.00 1,425.00
Tukang alumunium L.02 OH 0.1500 120,000.00 18,000.00
Kepala tukang L.03 OH 0.0150 130,000.00 1,950.00
Mandor L.04 OH 0.0008 145,000.00 116.00
Upah pas alumunium m' 3.0000 10,270.00 30,810.00
JUMLAH TENAGA KERJA 52,301.00
B BAHAN
Metal stud m' 3.0000 50,000.00 150,000.00
Gypsum 9mm m2 1.1000 89,500.00 98,450.00
Screw bh 12.0000 250.00 3,000.00
JUMLAH HARGA BAHAN 251,450.00
C PERALATAN
Alat Pemotong ls 1.000 10,000 10,000.00
JUMLAH HARGA ALAT 10,000.00

D Jumlah (A+B+C) 313,751.00


E Overhead & Profit 10.00% 31,375.10
F Harga Satuan Pekerjaaan (D+E) 345,126.10

31 Pemasangan Partisi Gypsum rangka rangka metal stud lapis insulasi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0150 95,000.00 1,425.00
Tukang alumunium L.02 OH 0.1500 120,000.00 18,000.00
Kepala tukang L.03 OH 0.0150 130,000.00 1,950.00
Mandor L.04 OH 0.0008 145,000.00 116.00
Upah pas alumunium m' 3.0000 10,270.00 30,810.00
Upah pas insulasi m2 1.0000 20,000.00 20,000.00
JUMLAH TENAGA KERJA 72,301.00
B BAHAN
Metal stud m' 3.0000 50,000.00 150,000.00
Gypsum jaya bell m2 1.1000 150,000.00 165,000.00
Screw bh 12.0000 250.00 3,000.00
Insulasi (Glaswool) m2 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 368,000.00
C PERALATAN
Alat bantu ls 1.000 25,000 25,000.00
JUMLAH HARGA ALAT 25,000.00

D Jumlah (A+B+C) 465,301.00


E Overhead & Profit 10.00% 46,530.10
F Harga Satuan Pekerjaaan (D+E) 511,831.10

hal-91
HARGA SATUAN PEKERJAAN KAYU

Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 7.0000 95,000.00 665,000.00
Tukang kayu L.02 OH 21.0000 120,000.00 2,520,000.00
Kepala tukang L.03 OH 2.1000 130,000.00 273,000.00
Mandor L.04 OH 0.3500 145,000.00 50,750.00
JUMLAH TENAGA KERJA 3,508,750.00
B BAHAN
Balok kayu m3 1.1000 11,000,000.00 12,100,000.00
Paku 10cm kg 1.2500 23,000.00 28,750.00
Lem kayu kg 1.0000 250,000.00 250,000.00
JUMLAH HARGA BAHAN 12,378,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 15,887,500.00


E Overhead & Profit 10.00% 1,588,750.00
F Harga Satuan Pekerjaaan (D+E) 17,476,250.00

Pembuatan dan pemasangan 1 m² daun pintu panel, kayu kelas I jati raha
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.0000 95,000.00 95,000.00
Tukang kayu L.02 OH 3.0000 120,000.00 360,000.00
Kepala tukang L.03 OH 0.3000 130,000.00 39,000.00
Mandor L.04 OH 0.0500 145,000.00 7,250.00
JUMLAH TENAGA KERJA 501,250.00
B BAHAN
Papan kayu klas (jati raha) m3 0.0400 2,500,000.00 100,000.00
Lem kayu kg 0.0500 250,000.00 12,500.00
JUMLAH HARGA BAHAN 112,500.00
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 621,250.00


E Overhead & Profit 10.00% 62,125.00
F Harga Satuan Pekerjaaan (D+E) 683,375.00

HAL-92
Pembuatan dan pemasangan 1 m² daun pintu dan jendela kaca, kayu kelas I atau II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.8000 95,000.00 76,000.00
Tukang kayu L.02 OH 2.4000 120,000.00 288,000.00
Kepala tukang L.03 OH 0.2400 130,000.00 31,200.00
Mandor L.04 OH 0.0400 145,000.00 5,800.00
JUMLAH TENAGA KERJA 401,000.00
B BAHAN
Papan kayu m3 0.0140 11,000,000.00 154,000.00
Lem kayu kg 0.2500 250,000.00 62,500.00
JUMLAH HARGA BAHAN 216,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 617,500.00


E Overhead & Profit 10.00% 61,750.00
F Harga Satuan Pekerjaaan (D+E) 679,250.00

Pembuatan dan pemasangan 1 m² daun pintu dan jendela jalusi, kayu kelas I atau II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 1.0000 95,000.00 95,000.00
Tukang kayu L.02 OH 3.0000 120,000.00 360,000.00
Kepala tukang L.03 OH 0.3000 130,000.00 39,000.00
Mandor L.04 OH 0.0500 145,000.00 7,250.00
JUMLAH TENAGA KERJA 501,250.00
B BAHAN
Papan kayu m3 0.0640 2,500,000.00 160,000.00
Lem kayu kg 0.5000 250,000.00 125,000.00
JUMLAH HARGA BAHAN 285,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 786,250.00


E Overhead & Profit 10.00% 78,625.00
F Harga Satuan Pekerjaaan (D+E) 864,875.00

HAL-93
Pembuatan 1 m² daun pintu plywood rangkap, rangka kayu kelas II tertutup
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.7000 95,000.00 66,500.00
Tukang kayu L.02 OH 2.1000 120,000.00 252,000.00
Kepala tukang L.03 OH 0.2100 130,000.00 27,300.00
Mandor L.04 OH 0.0350 145,000.00 5,075.00
JUMLAH TENAGA KERJA 350,875.00
B BAHAN
Papan kayu m3 0.0250 2,500,000.00 62,500.00
Paku 1-2,5cm kg 0.0300 20,900.00 627.00
Lem kayu kg 0.5000 250,000.00 125,000.00
Plywood tebal 4mm ukuran
90x220cm lbr 1.0000 -
JUMLAH HARGA BAHAN 188,127.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 539,002.00


E Overhead & Profit 10.00% 53,900.20
F Harga Satuan Pekerjaaan (D+E) 592,902.20

Pembuatan 1 m² daun pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.8000 95,000.00 76,000.00
Tukang kayu L.02 OH 2.4000 120,000.00 288,000.00
Kepala tukang L.03 OH 0.2400 130,000.00 31,200.00
Mandor L.04 OH 0.0400 145,000.00 5,800.00
JUMLAH TENAGA KERJA 401,000.00
B BAHAN
Papan kayu m3 0.0256 2,500,000.00 64,000.00
Paku 1-2,5cm kg 0.0300 20,900.00 627.00
Lem kayu kg 0.5000 250,000.00 125,000.00
Plywood tebal 4mm ukuran
90x220cm lbr 1.0000 62,000.00 62,000.00
JUMLAH HARGA BAHAN 251,627.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 652,627.00


E Overhead & Profit 10.00% 65,262.70
F Harga Satuan Pekerjaaan (D+E) 717,889.70

HAL-94
Pemasangan 1 m² jalusi kusen, kayu kelas I atau II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.6700 95,000.00 63,650.00
Tukang kayu L.02 OH 2.0000 120,000.00 240,000.00
Kepala tukang L.03 OH 0.2000 130,000.00 26,000.00
Mandor L.04 OH 0.3350 145,000.00 48,575.00
JUMLAH TENAGA KERJA 378,225.00
B BAHAN
Papan kayu m3 0.0600 20,900.00 1,254.00
Paku 1-2,5cm kg 0.1500 20,900.00 3,135.00
JUMLAH HARGA BAHAN 4,389.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 382,614.00


E Overhead & Profit 10.00% 38,261.40
F Harga Satuan Pekerjaaan (D+E) 420,875.40

Pemasangan daun pintu 1 m² multipleks t = 6mm rangkap rangka kayu kelas I


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.8500 95,000.00 80,750.00
Tukang kayu L.02 OH 2.5500 120,000.00 306,000.00
Kepala tukang L.03 OH 0.2550 130,000.00 33,150.00
Mandor L.04 OH 0.0430 145,000.00 6,235.00
Upah rangka pintu OH 1.0430 145,000.00 151,235.00
JUMLAH TENAGA KERJA 426,135.00
B BAHAN
Papan kayu kayu klass I m3 0.0250 11,000,000.00 275,000.00
Paku 1-2,5cm kg 0.0300 20,900.00 627.00
Lem kayu kg 0.3000 250,000.00 75,000.00
multipleks 6mm 120x240cm lbr 0.3472 91,000.00 31,597.22
JUMLAH HARGA BAHAN 382,224.22
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 808,359.22


E Overhead & Profit 10.00% 80,835.92
F Harga Satuan Pekerjaaan (D+E) 889,195.14

HAL-95
Pembuatan dan pemasangan Pintu type 1
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pintu m2 2.26 382,224.22 863,826.74
Upah pas. HPL m2 4.52 40,000.00 180,800.00
Upah Pas. Engsel bh 6.0000 21,491.00 128,946.00
Upah pas. Kunci bh 1.0000 68,175.00 68,175.00
Upah Kusen m1 6.0000 10,108.50 60,651.00
Upah pas. Kaca m2 1.2600 21,491.00 27,078.66
JUMLAH TENAGA KERJA 1,329,477.40
B BAHAN
Pintu Multipleks rangka kayu m2 2.2600 426,135.00 963,065.10
HPL m2 4.5200 200,000.00 904,000.00
Kusen Alumunium m2 6.00 142,950.00 857,700.00
Kunci bh 1.0000 350,000.00 350,000.00
Engsel Pintu bh 6.0000 36,200.00 217,200.00
Kaca panasap 5mm m2 1.2600 122,530.00 154,387.80
JUMLAH HARGA BAHAN 3,446,352.90
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 4,783,330.30


E Overhead & Profit 10.00% 478,333.03
F Harga Satuan Pekerjaaan (D+E) 5,261,663.33

Pembuatan dan pemasangan Pintu type 2


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pintu m2 2.03 382,224.22 775,915.17
Upah pas. HPL m2 4.06 40,000.00 162,400.00
Upah Pas. Engsel bh 6.0000 21,491.00 128,946.00
Upah pas. Kunci bh 1.0000 68,175.00 68,175.00
Upah Kusen m1 5.8000 10,108.50 58,629.30
Upah pas. Kaca m2 1.0500 21,491.00 22,565.55
JUMLAH TENAGA KERJA 1,216,631.02
B BAHAN
Pintu Multipleks rangka kayu m2 2.0300 426,135.00 865,054.05
HPL m2 4.0600 200,000.00 812,000.00
Kusen Alumunium m2 5.80 142,950.00 829,110.00
Kunci bh 1.0000 350,000.00 350,000.00
Engsel Pintu bh 6.0000 36,200.00 217,200.00
Kaca panasap 5mm m2 1.0500 122,530.00 128,656.50
JUMLAH HARGA BAHAN 3,202,020.55
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 4,426,151.57


E Overhead & Profit 10.00% 442,615.16
F Harga Satuan Pekerjaaan (D+E) 4,868,766.73

HAL-96
Pembuatan dan pemasangan Pintu type 3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pintu m2 3.37 382,224.22 1,288,095.63
Upah pas. HPL m2 6.74 40,000.00 269,600.00
Upah Pas. Engsel bh 6.0000 21,491.00 128,946.00
Upah pas. Kunci bh 1.0000 68,175.00 68,175.00
Upah Kusen m1 6.0000 10,108.50 60,651.00
Upah pas. Kaca m2 0.1500 21,491.00 3,223.65
JUMLAH TENAGA KERJA 1,818,691.28
B BAHAN
Pintu Multipleks rangka kayu m2 3.3700 426,135.00 1,436,074.95
HPL m2 6.7400 200,000.00 1,348,000.00
Kusen Alumunium m2 6.00 142,950.00 857,700.00
Kunci bh 1.0000 350,000.00 350,000.00
Engsel Pintu bh 6.0000 36,200.00 217,200.00
Kaca panasap 5mm m2 0.1500 122,530.00 18,379.50
JUMLAH HARGA BAHAN 4,227,354.45
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 6,053,545.73


E Overhead & Profit 10.00% 605,354.57
F Harga Satuan Pekerjaaan (D+E) 6,658,900.30

Pembuatan dan pemasangan Pintu type 4


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pintu m2 2.93 382,224.22 1,119,916.97
Upah pas. HPL m2 5.86 40,000.00 234,400.00
Upah Pas. Engsel bh 6.0000 21,491.00 128,946.00
Upah pas. Kunci bh 1.0000 68,175.00 68,175.00
Upah Kusen m1 5.8000 10,108.50 58,629.30
Upah pas. Kaca m2 0.1500 21,491.00 3,223.65
JUMLAH TENAGA KERJA 1,613,290.92
B BAHAN
Pintu Multipleks rangka kayu m2 2.9300 426,135.00 1,248,575.55
HPL m2 5.8600 200,000.00 1,172,000.00
Kusen Alumunium m2 5.80 142,950.00 829,110.00
Kunci bh 1.0000 350,000.00 350,000.00
Engsel Pintu bh 6.0000 36,200.00 217,200.00
Kaca panasap 5mm m2 0.1500 122,530.00 18,379.50
JUMLAH HARGA BAHAN 3,835,265.05
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 5,456,055.97


E Overhead & Profit 10.00% 545,605.60
F Harga Satuan Pekerjaaan (D+E) 6,001,661.57

HAL-97
Pembuatan dan pemasangan Pintu type 5
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pintu m2 3.37 382,224.22 1,288,095.63
Upah pas. HPL m2 6.74 40,000.00 269,600.00
Upah Pas. Engsel bh 6.0000 21,491.00 128,946.00
Upah pas. Kunci bh 1.0000 68,175.00 68,175.00
Upah Kusen m1 6.0000 10,108.50 60,651.00
Upah pas. Kaca m2 0.1500 21,491.00 3,223.65
JUMLAH TENAGA KERJA 1,818,691.28
B BAHAN
Pintu Multipleks rangka kayu m2 3.3700 426,135.00 1,436,074.95
HPL m2 6.7400 200,000.00 1,348,000.00
Kusen Alumunium m2 6.00 142,950.00 857,700.00
Kunci bh 1.0000 350,000.00 350,000.00
Engsel Pintu bh 6.0000 36,200.00 217,200.00
Kaca panasap 5mm m2 0.1500 122,530.00 18,379.50
JUMLAH HARGA BAHAN 4,227,354.45
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 6,053,545.73


E Overhead & Profit 10.00% 605,354.57
F Harga Satuan Pekerjaaan (D+E) 6,658,900.30

Pembuatan dan pemasangan Pintu type 6


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pintu m2 1.69 382,224.22 644,047.81
Upah pas. HPL m2 3.37 40,000.00 134,800.00
Upah Pas. Engsel bh 3.0000 21,491.00 64,473.00
Upah pas. Kunci bh 1.0000 68,175.00 68,175.00
Upah Kusen m1 5.3000 10,108.50 53,575.05
Upah pas. Kaca m2 0.0750 21,491.00 1,611.83
JUMLAH TENAGA KERJA 966,682.69
B BAHAN
Pintu Multipleks rangka kayu m2 1.6850 426,135.00 718,037.48
HPL m2 3.3700 200,000.00 674,000.00
Kusen Alumunium m2 5.30 142,950.00 757,635.00
Kunci bh 1.0000 350,000.00 350,000.00
Engsel Pintu bh 3.0000 36,200.00 108,600.00
Kaca panasap 5mm m2 0.0750 122,530.00 9,189.75
JUMLAH HARGA BAHAN 2,617,462.23
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 3,591,644.91


E Overhead & Profit 10.00% 359,164.49
F Harga Satuan Pekerjaaan (D+E) 3,950,809.41

HAL-98
Pembuatan dan pemasangan Pintu type 7
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pintu m2 1.24 382,224.22 473,958.04
Upah pas. HPL m2 2.48 40,000.00 99,200.00
Upah Pas. Engsel bh 3.0000 21,491.00 64,473.00
Upah pas. Kunci bh 1.0000 68,175.00 68,175.00
Upah Kusen m1 2.7500 10,108.50 27,798.38
Upah pas. Kaca m2 0.0000 21,491.00 -
JUMLAH TENAGA KERJA 733,604.41
B BAHAN
Pintu Multipleks rangka kayu m2 1.2400 426,135.00 528,407.40
HPL m2 2.4800 200,000.00 496,000.00
Kusen Alumunium m2 2.75 142,950.00 393,112.50
Kunci bh 1.0000 350,000.00 350,000.00
Engsel Pintu bh 3.0000 36,200.00 108,600.00
Kaca panasap 5mm m2 0.0000 122,530.00 -
JUMLAH HARGA BAHAN 1,876,119.90
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 2,617,224.31


E Overhead & Profit 10.00% 261,722.43
F Harga Satuan Pekerjaaan (D+E) 2,878,946.74

Pembuatan dan pemasangan Pintu type 8


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pintu m2 1.24 382,224.22 473,958.04
Upah pas. HPL m2 1.24 40,000.00 49,600.00
Upah pas. Lapis Aluminium m2 1.24 40,000.00 49,600.00
Upah Pas. Engsel bh 3.0000 21,491.00 64,473.00
Upah pas. Kunci bh 1.0000 68,175.00 68,175.00
Upah Kusen m1 2.7500 10,108.50 27,798.38
Upah pas. Kaca m2 0.0000 21,491.00 -
JUMLAH TENAGA KERJA 733,604.41
B BAHAN
Pintu Multipleks rangka kayu m2 1.2400 426,135.00 528,407.40
HPL m2 1.2400 200,000.00 248,000.00
Lapisan Aluminium m2 1.2400 325,000.00 403,000.00
Kusen Alumunium m2 2.75 142,950.00 393,112.50
Kunci bh 1.0000 350,000.00 350,000.00
Engsel Pintu bh 3.0000 36,200.00 108,600.00
Kaca panasap 5mm m2 0.0000 122,530.00 -
JUMLAH HARGA BAHAN 2,031,119.90
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 2,772,224.31


E Overhead & Profit 10.00% 277,222.43
F Harga Satuan Pekerjaaan (D+E) 3,049,446.74

HAL-99
Pembuatan dan pemasangan Pintu type 9
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pintu m2 1.69 382,224.22 644,047.81
Upah pas. HPL m2 3.37 40,000.00 134,800.00
Upah Pas. Engsel bh 3.0000 21,491.00 64,473.00
Upah pas. Kunci bh 1.0000 68,175.00 68,175.00
Upah Handel Pintu bh 2.0000 67,410.00 134,820.00
Upah Kusen m1 5.3000 10,108.50 53,575.05
Upah pas. Kaca m2 0.0750 21,491.00 1,611.83
JUMLAH TENAGA KERJA 1,101,502.69
B BAHAN
Pintu Multipleks rangka kayu m2 1.6850 426,135.00 718,037.48
HPL m2 3.3700 200,000.00 674,000.00
Kusen Alumunium m2 5.30 142,950.00 757,635.00
Kunci bh 1.0000 350,000.00 350,000.00
Handel Pintu bh 2.0000 350,000.00 700,000.00
Engsel Pintu bh 3.0000 36,200.00 108,600.00
Kaca panasap 5mm m2 0.0750 122,530.00 9,189.75
JUMLAH HARGA BAHAN 3,317,462.23
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 4,426,464.91


E Overhead & Profit 10.00% 442,646.49
F Harga Satuan Pekerjaaan (D+E) 4,869,111.41

Pembuatan dan pemasangan Pintu type PJ1


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pintu m2 2.93 382,224.22 1,119,916.97
Upah pas. HPL m2 5.86 40,000.00 234,400.00
Upah Pas. Engsel bh 6.0000 21,491.00 128,946.00
Upah pas. Kunci bh 1.0000 68,175.00 68,175.00
Upah Kusen m1 16.6000 10,108.50 167,801.10
Upah pas. Kaca m2 4.3200 21,491.00 92,841.12
JUMLAH TENAGA KERJA 1,812,080.19
B BAHAN
Pintu Multipleks rangka kayu m2 2.9300 426,135.00 1,248,575.55
HPL m2 5.8600 200,000.00 1,172,000.00
Kusen Alumunium m2 16.60 142,950.00 2,372,970.00
Kunci bh 1.0000 350,000.00 350,000.00
Engsel Pintu bh 6.0000 36,200.00 217,200.00
Kaca panasap 5mm m2 4.3200 122,530.00 529,329.60
JUMLAH HARGA BAHAN 5,890,075.15
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) 7,709,655.34


E Overhead & Profit 10.00% 770,965.53
F Harga Satuan Pekerjaaan (D+E) 8,480,620.88

HAL-100
Pembuatan dan pemasangan Pintu type 3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Upah Pintu m2 2.25 0.00 -
Upah pas. HPL m2 4.50 0.00 -
Upah Pas. Engsel bh 3.0000 0.00 -
Upah pas. Kunci bh 1.0000 0.00 -
Upah Kusen m1 5.9000 0.00 -
JUMLAH TENAGA KERJA -
B BAHAN
Pintu Multipleks rangka kayu m2 2.2500 #REF! #REF!
HPL m2 4.5000 #REF! #REF!
Kusen Alumunium m2 5.90 #REF! #REF!
Kunci bh 1.0000 #REF! #REF!
Engsel Pintu bh 3.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Alat bantu ls 1.000 7500 7,500.00
JUMLAH HARGA ALAT 7,500.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10.00% #REF!
F Harga Satuan Pekerjaaan (D+E) #REF!

Pemasangan 1 m' listplank ukuran 3x20cm, kayu kelas I dan II


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.1000 95,000.00 9,500.00
Tukang kayu L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 130,000.00 2,600.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 36,825.00
B BAHAN
Papan kayu m3 0.0108 2,500,000.00 27,000.00
Paku 5cm - 7cm kg 0.1000 23,000.00 2,300.00
JUMLAH HARGA BAHAN 29,300.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 66,125.00


E Overhead & Profit 10.00% 6,612.50
F Harga Satuan Pekerjaaan (D+E) 72,737.50

HAL-101
Pemasangan 1 m' listplank ukuran 3x30cm, kayu kelas I dan II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.1000 95,000.00 9,500.00
Tukang kayu L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 130,000.00 2,600.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 36,825.00
B BAHAN
Papan kayu m3 0.0110 2,500,000.00 27,500.00
Paku 5cm - 7cm kg 0.0500 23,000.00 1,150.00
JUMLAH HARGA BAHAN 28,650.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 65,475.00


E Overhead & Profit 10.00% 6,547.50
F Harga Satuan Pekerjaaan (D+E) 72,022.50

HAL-102
HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

1 Pemasangan 1 kg besi profil


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0600 95,000.00 5,700.00
Tukang las konstruksi L.02 OH 0.0600 120,000.00 7,200.00
Kepala tukang L.03 OH 0.0060 130,000.00 780.00
Mandor L.04 OH 0.0030 145,000.00 435.00
JUMLAH TENAGA KERJA 14,115.00
B BAHAN
Besi profil Kg 1.1500 16,500.00 18,975.00
JUMLAH HARGA BAHAN 18,975.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 33,090.00


E Overhead & Profit 10.00% 3,309.00
F Harga Satuan Pekerjaaan (D+E) 36,399.00

2 Pemasangan 1 kg rangka kuda-kuda baja IWF


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0600 95,000.00 5,700.00
Tukang las konstruksi L.02 OH 0.0600 120,000.00 7,200.00
Kepala tukang L.03 OH 0.0060 130,000.00 780.00
Mandor L.04 OH 0.0030 145,000.00 435.00
JUMLAH TENAGA KERJA 14,115.00
B BAHAN
Besi baja IWF Kg 1.1500 13,500.00 15,525.00
JUMLAH HARGA BAHAN 15,525.00
C PERALATAN
Peralatan dan material bantu ls 1.00 5,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 34,640.00


E Overhead & Profit 10.00% 3,464.00
F Harga Satuan Pekerjaaan (D+E) 38,104.00

HAL-103
3 Pemasangan 100 kg pekerjaan perakitan
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.1000 95,000.00 9,500.00
Tukang las konstruksi L.02 OH 0.1000 120,000.00 12,000.00
Kepala tukang L.03 OH 0.0010 130,000.00 130.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 22,355.00
B BAHAN
Solar Ltr 1.0000 5,500.00 5,500.00
Minyak pelumas Ltr 0.1000 35,000.00 3,500.00
JUMLAH HARGA BAHAN 9,000.00
C PERALATAN
Sewa alat Jam 0.800 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,355.00


E Overhead & Profit 10.00% 3,135.50
F Harga Satuan Pekerjaaan (D+E) 34,490.50

4 Pemasangan 1 m² sunscreen alluminium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0800 95,000.00 7,600.00
Tukang L.02 OH 0.8000 120,000.00 96,000.00
Kepala tukang L.03 OH 0.0800 130,000.00 10,400.00
Mandor L.04 OH 0.0040 145,000.00 580.00
JUMLAH TENAGA KERJA 114,580.00
B BAHAN
Alumunium 5/10 m' 1.0000 65,000.00 65,000.00
alumunium 4/6 m' 10.0000 65,000.00 650,000.00
JUMLAH HARGA BAHAN 715,000.00
C PERALATAN
Material bantu ls 1.000 20,000.0 20,000.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 849,580.00


E Overhead & Profit 10.00% 84,958.00
F Harga Satuan Pekerjaaan (D+E) 934,538.00

HAL-104
5 Pemasangan 1 m1 kusen pintu alluminium
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0430 95,000.00 4,085.00
Tukang khusus aluminium L.02 OH 0.0430 120,000.00 5,160.00
Kepala tukang L.03 OH 0.0043 130,000.00 559.00
Mandor L.04 OH 0.0021 145,000.00 304.50
JUMLAH TENAGA KERJA 10,108.50
B BAHAN
Profil Aluminium m 1.1000 127,500.00 140,250.00
Skrup fixer bh 2.0000 300.00 600.00
Sealant tube 0.0600 35,000.00 2,100.00
JUMLAH HARGA BAHAN 142,950.00
C PERALATAN
Alat bantu ls 1.000 2500 2,500.00
JUMLAH HARGA ALAT 2,500.00

D Jumlah (A+B+C) 155,558.50


E Overhead & Profit 10.00% 15,555.85
F Harga Satuan Pekerjaaan (D+E) 171,114.35

6 Pemasangan 1 m1 rangka pintu pintu alluminium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0430 95,000.00 4,085.00
Tukang khusus aluminium L.02 OH 0.0430 120,000.00 5,160.00
Kepala tukang L.03 OH 0.0043 130,000.00 559.00
Mandor L.04 OH 0.0021 145,000.00 304.50
JUMLAH TENAGA KERJA 10,108.50
B BAHAN
Profil Aluminium rangka pintu m 1.1000 125,000.00 137,500.00
Skrup fixer bh 2.0000 300.00 600.00
Sealant tube 0.0600 35,000.00 2,100.00
JUMLAH HARGA BAHAN 140,200.00
C PERALATAN
Alat bantu ls 1.000 2500 2,500.00
JUMLAH HARGA ALAT 2,500.00

D Jumlah (A+B+C) 152,808.50


E Overhead & Profit 10.00% 15,280.85
F Harga Satuan Pekerjaaan (D+E) 168,089.35

HAL-105
7 Pemasangan 1 m1 rangka jendela alluminium
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.0430 95,000.00 4,085.00
Tukang khusus aluminium L.02 OH 0.0430 120,000.00 5,160.00
Kepala tukang L.03 OH 0.0043 130,000.00 559.00
Mandor L.04 OH 0.0021 145,000.00 304.50
JUMLAH TENAGA KERJA 10,108.50
B BAHAN
Profil Aluminium rangka jendela m 1.1000 75,000.00 82,500.00
Skrup fixer bh 2.0000 300.00 600.00
Sealant tube 0.0600 35,000.00 2,100.00
JUMLAH HARGA BAHAN 85,200.00
C PERALATAN
Alat bantu ls 1.000 2500 2,500.00
JUMLAH HARGA ALAT 2,500.00

D Jumlah (A+B+C) 97,808.50


E Overhead & Profit 10.00% 9,780.85
F Harga Satuan Pekerjaaan (D+E) 107,589.35

8 Pemasangan 1 m² pintu kaca rangka alluminium


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.2975 95,000.00 28,262.50
Tukang L.02 OH 0.2975 120,000.00 35,700.00
Kepala tukang L.03 OH 0.0315 130,000.00 4,095.00
Mandor L.04 OH 0.0175 145,000.00 2,537.50
JUMLAH TENAGA KERJA 70,595.00
B BAHAN
Alumunium rangka daun pintu m 4.4000 140,200.00 616,880.00
Kaca panasap 5mm m 1.0000 122,530.00 122,530.00
Sealant tube 0.2700 35,000.00 9,450.00
JUMLAH HARGA BAHAN 748,860.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 819,455.00


E Overhead & Profit 10.00% 81,945.50
F Harga Satuan Pekerjaaan (D+E) 901,400.50

HAL-106
9 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafond
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3500 95,000.00 33,250.00
Tukang besi L.02 OH 0.3500 120,000.00 42,000.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0180 145,000.00 2,610.00
JUMLAH TENAGA KERJA 82,410.00
B BAHAN
Rangka metal hollow
40.40.2 mm m' 4.0000 6,500.00 26,000.00
Rangka metal hollow
40.20.2 mm m' 3.0000 5,000.00 15,000.00
assesoris (perkuatan, las,
dll) Ls 30% 41,000.00 12,300.00
JUMLAH HARGA BAHAN 53,300.00
C PERALATAN
Alat bantu ls 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 140,710.00


E Overhead & Profit 10.00% 14,071.00
F Harga Satuan Pekerjaaan (D+E) 154,781.00

10 Pemasangan Rangka Atap Baja Ringan


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.4000 95,000.00 38,000.00
Tukang besi L.02 OH 0.4000 120,000.00 48,000.00
Kepala tukang L.03 OH 0.1050 130,000.00 13,650.00
Mandor L.04 OH 0.0050 145,000.00 725.00
JUMLAH TENAGA KERJA 100,375.00
B BAHAN
Profil C 75. 100 M2 0.720 20,000.00 14,400.00
Profil C 75. 75 M2 0.620 15,250.00 9,455.00
Profil U 50.60.100 M2 1.740 35,000.00 60,900.00
Profil U 35.30.40 M2 0.290 17,500.00 5,075.00
Screw Kuda-kuda 12-14x40 Bh 5.000 1,000.00 5,000.00
Screw Reng 10-16x16 Bh 5.000 1,000.00 5,000.00
JUMLAH HARGA BAHAN 99,830.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 200,205.00


E Overhead & Profit 10.00% 20,020.50
F Harga Satuan Pekerjaaan (D+E) 220,225.50

HAL-107
11 Pemasangan 1 m2 rangka utama ACP siku 50.50.5
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.3500 95,000.00 33,250.00
Tukang besi L.02 OH 0.3500 120,000.00 42,000.00
Kepala tukang L.03 OH 0.0350 130,000.00 4,550.00
Mandor L.04 OH 0.0180 145,000.00 2,610.00
JUMLAH TENAGA KERJA 82,410.00
B BAHAN
siku 50.50.5 kg 14.8400 15,000.00 222,600.00
assesoris (perkuatan, las,
dll) Ls 30% 66,780.00 20,034.00
JUMLAH HARGA BAHAN 242,634.00
C PERALATAN
Alat bantu lot 1.000 5000 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 330,044.00


E Overhead & Profit 10.00% 33,004.40
F Harga Satuan Pekerjaaan (D+E) 363,048.40

12 Pemasangan 1 m2 alumunium composite panel rangka besi hollow 1x40.40.2


dan rangka utama siku 40 x 40 x 4
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.6250 95,000.00 59,375.00
Tukang besi L.02 OH 0.6250 120,000.00 75,000.00
Kepala tukang L.03 OH 0.0625 130,000.00 8,125.00
Mandor L.04 OH 0.0325 145,000.00 4,712.50
JUMLAH TENAGA KERJA 147,212.50
B BAHAN
Rangka metal hollow
40.40.2 mm m' 4.0000 6,500.00 26,000.00
Rangka metal hollow
40.20.2 mm m' 4.0000 5,000.00 20,000.00
siku 40.40.4 kg 5.5000 36,399.00 200,194.50
Alumunium composite
Panel (Type PPDF) m2 1.000 350,000.00 350,000.00
Sealant tube
Screw bh
JUMLAH HARGA BAHAN 596,194.50
C PERALATAN
Alat bantu ls 1.000 20000 20,000.00
JUMLAH HARGA ALAT 20,000.00

D Jumlah (A+B+C) 763,407.00


E Overhead & Profit 10.00% 76,340.70
F Harga Satuan Pekerjaaan (D+E) 839,747.70

HAL-108
INDONESIA
KWITANSI No. 1 ( #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR BILLION AND

KWITANSI No. 2 ( ( Empat Ratus Tiga Puluh Delapan Juta Empat Ratus S
438,492,417.267
438492417 0
438492417.267 0 0 0
0 MILYAR BILLION AND

KWITANSI No. 3 ( ( Rupiah )


0.000
0 0
0.000 0 0 0
0 MILYAR BILLION AND

KWITANSI No. 4 ( ( Rupiah )


0.000
0 0
0.000 0 0 0
0 MILYAR BILLION AND

No AMOUNTH TO SAYED
001 #REF! #REF!
002 ( Empat Ratus Tiga Puluh Delapan Juta Empat Ratus Sembilan Puluh Dua Ribu Empat Ratus Tujuh B
003 ( Rupiah )
004 ( Rupiah )

SATUAN
ANGKA
1 Satu Satu ONE
2 Dua Dua TWO
3 Tiga Tiga THREE
4 Empat Empat FOUR
5 Lima Lima FIVE
6 Enam Enam SIX
7 Tujuh Tujuh SEVEN
8 Delapan Delapan EIGHT
9 Sembilan Sembilan NINE

PULUHAN
ANGKA
1 Sepuluh Sepuluh TEN
2 Dua Puluh Dua Puluh TWENTY
3 Tiga Puluh Tiga Puluh THIRTY
4 Empat Puluh Empat Puluh FOURTY
5 Lima Puluh Lima Puluh FIVETY
6 Enam Puluh Enam Puluh SIXTY
7 Tujuh Puluh Tujuh Puluh SEVENTY
8 Delapan Puluh Delapan Puluh EIGHTY
9 Sembilan Puluh Sembilan Puluh NINETY

BELASAN
ANGKA
10 Sepuluh Sepuluh TEN
11 Sebelas Sebelas ELEVEN
12 Dua Belas Dua Belas TWELVE
13 Tiga Belas Tiga Belas THIRTEEN
14 Empat Belas Empat Belas FOURTEEN
15 Lima Belas Lima Belas FIVETEEN
16 Enam Belas Enam Belas SIXTEEN
17 Tujuh Belas Tujuh Belas SEVENTEEN
18 Delapan Belas Delapan Belas EIGHTEEN
19 Sembilan Belas Sembilan Belas NINETEEN

RATUSAN
ANGKA
1 Seratus Seratus HUNDRED AND
2 Dua Ratus Dua Ratus TWO HUNDRED AND
3 Tiga Ratus Tiga Ratus THREE HUNDRED AND
4 Empat Ratus Empat Ratus FOUR HUNDRED AND
5 Lima Ratus Lima Ratus FIVE HUNDRED AND
6 Enam Ratus Enam Ratus SIX HUNDRED AND
7 Tujuh Ratus Tujuh Ratus SEVEN HUNDRED AND
8 Delapan Ratus Delapan Ratus EIGHT HUNDRED AND
9 Sembilan Ratus Sembilan Ratus NINE HUNDRED AND
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
BILLION AND #REF! Juta

uh Delapan Juta Empat Ratus Sembilan Puluh Dua Ribu Empat Ratus Tujuh Belas Koma Dua Ratus Enam Puluh Tujuh Rupiah )
438 4 3 Empat Ratus Tiga Puluh Delapan Juta
438492417.267
4 3 Empat Ratus Tiga Puluh
BILLION AND Juta Juta

0.000
0 0
BILLION AND Juta

0.000
0 0
BILLION AND Juta

Dua Ribu Empat Ratus Tujuh Belas Koma Dua Ratus Enam Puluh Tujuh Rupiah )
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
MILLION AND

492 4 9
492417.267
Delapan 4 9
MILLION AND

0.000
0 0
MILLION AND

0.000
0 0
MILLION AND
#REF! #REF!
#REF!
#REF! #REF! #REF! #REF!
#REF! #REF! Ribu THOUSAND AND

2 Empat Ratus Sembilan Puluh Dua Ribu


0
2 Empat Ratus Sembilan Puluh Dua
15 Ribu Ribu THOUSAND AND

0
0
0 Ribu THOUSAND AND

0
0
0 Ribu THOUSAND AND
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

417 4 1 7
417.267 17 17
4 1 7

0 0
0.000 0
0 0 0

0 0
0.000 0
0 0 0
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! Rupiah )

Empat Ratus Tujuh Belas 267 2 6 7 Koma Dua Ratus Enam Puluh Tujuh
0
Empat Ratus Tujuh Belas 2 6 7 Dua Ratus Enam Puluh Tujuh Koma
2 15 Rupiah )

000 0 0 0
0
0 0 0
0 0 Rupiah )

000 0 0 0
0
0 0 0
0 0 Rupiah )
Koma
Rupiah )

Koma
Rupiah )

Koma
Rupiah )

Koma
Rupiah )
Pnjng Ekivalen=1m3 Kbthn. Tul
No. Tipe konstruksi
lbr tg panj (mm)

A. PONDASI POER
1. Pile Cape 90x90x30
- Tulangan 90 0.90 0.30 3.70 7 Ø
- Tulangan 90 0.90 0.30 3.70 7 Ø
- Kawat 0.90 0.30
- Kawat 0.90 0.30
2. Tie Beam 25x40
- Tulangan Utama 0.25 0.40 10.00 4 Ø
- Tulangan Pinggang 0.20 0.40 12.50 4 Ø
- Beugel 0.25 0.40 1.38 7 Ø
B. TANGGA
1. Pile Cape90x90x30
- Tulangan 60 0.60 0.20 8.33 7 Ø
- Tulangan 100 1.00 0.20 5.00 7 Ø
- Kawat 1.00 0.20
2. Tie Beam 25x40
- Tulangan Utama 0.20 0.30 16.67 4 Ø
- Tulangan Pinggang 0.20 0.30 16.67 4 Ø
- Beugel 0.20 0.30 1.08 10 Ø
3. Balok 15x40
- Tulangan Utama 0.15 0.40 16.67 4 Ø
- Tulangan Pinggang 0.15 0.40 16.67 4 Ø
- Beugel 0.15 0.40 1.18 7 Ø
C. KOLOM
1. Kolom 25x40 Lantai 1
- Tulangan Utama 0.25 0.40 10.00 4 Ø
- Tulangan Pinggang 0.25 0.40 10.00 2 Ø
- Beugel 0.25 0.40 2.80 7 Ø

1. Kolom 25x40 Lantai 2


- Tulangan Utama 0.25 0.30 13.33 4 Ø
- Tulangan Pinggang 0.25 0.30 13.33 2 Ø
- Beugel 0.25 0.30 2.40 5 Ø

2. Kolom 15x15 Lantai 1


- Tulangan Utama 0.15 0.15 44.44 4 Ø
- Beugel 0.15 0.15 1.40 7 Ø

2. Kolom 15x15 Lantai 2


- Tulangan Utama 0.15 0.15 44.44 4 Ø
- Beugel 0.15 0.15 1.36 7 Ø

D. SLOOF
1. Sloof 15x20
- Tulangan Utama 0.15 0.20 33.33 4 Ø
- Tulangan Pinggang 0.15 0.20 33.33 4 Ø
- Beugel 0.15 0.20 0.80 7 Ø

E. BALOK
1. Balok 20x30
Tulangan Utama 0.20 0.30 16.67 4 Ø
Tulangan Pinggang 0.20 0.30 16.67 4 Ø
Beugel 0.20 0.30 1.08 7 Ø

2. Balok 15x20
Tulangan Utama 0.15 0.20 33.33 4 Ø
Tulangan Pinggang 0.15 0.20 33.33 2 Ø
Beugel 0.20 0.25 0.98 7 Ø

F. RING BALOK
1. RingBalok 15x20
Tulangan Utama 0.15 0.20 33.33 4 Ø
Tulangan Pinggang 0.15 0.20 33.33 2 Ø
Beugel 0.15 0.20 0.78 10 Ø
Kbthn. Tul Brt Tul Berat per Kbthn Jml Btg Dalam 1m3 Jumlah Begel Kebutuhan Kawat
Per M3
(mm) (Kg/m') 1m' (kg) per m3 (kg) bkstng (m2) dlm m3 (Bh) Beton dlm1 m3
12.00

87.68 8.89 0.44


12 0.888 5.9184 43.84 4.4444
12 0.888 5.9184 43.84 4.4444
37.04 Bh 0.44 Kg
37.04 Bh 0.44 Kg
39.14 16.00 1.20
12 0.888 3.55104 35.51 2.96 16.0000
10 0.617 2.466 30.83 2.57
8 0.395 2.63 3.63 0.30 100.00 Bh 1.20 Kg

78.91 3.33 0.60


12 0.888 5.9184 49.32 Err:522 3.3333
12 0.888 5.9184 29.59 Err:522
50.00 Bh 0.60 Kg
109.48 15.00 2.00
16 1.578 6.31296 105.22 8.77 15.0000
10 0.617 2.466 41.10 3.43
8 0.395 3.95 4.26 0.36 166.67 Bh 2.00 Kg
62.29 20.00 2.00
12 0.888 3.55104 59.18 4.93 20.0000
10 0.617 2.466 41.10 3.43
8 0.395 2.63 3.10 0.26 166.67 Bh 2.00 Kg

55.21 16.00 0.60


12 0.888 3.55104 35.51 2.96 16.0000
10 0.617 1.233 12.33 1.03
8 0.395 2.63 7.37 0.61 50.00 Bh 0.60 Kg

68.52 16.00 0.80


12 0.888 3.55104 47.35 3.95 16.0000
10 0.617 1.233 16.44
8 0.395 1.97 4.73 66.67 Bh 0.80 Kg

111.67 26.67 3.56


10 0.617 2.466 109.60 9.13 26.6667
6 0.222 1.48 2.07 0.17 296.30 Bh 3.56 Kg

111.61 26.67 3.56


10 0.617 2.466 109.60 9.13 26.6667
6 0.222 1.48 2.01 0.17 296.30 Bh 3.56 Kg

276.19 13.33 4.00


12 0.888 3.55104 118.37 9.86 13.3333
8 0.395 1.57824 52.61 4.38
8 0.395 2.63 105.22 8.77 333 Bh 4.00 Kg

103.12 15.00 1.00


12 0.888 3.55104 59.18 4.93 15.0000
10 0.617 2.466 41.10 3.43
8 0.395 2.63 2.84 0.24 83.33 Bh 1.00 Kg

84.78 20.00 1.20


10 0.617 2.466 82.20 6.85 20.0000
8 0.395 0.78912 26.30 2.19
8 0.395 2.63 2.58 0.21 100.00 Bh 1.20 Kg

121.45 13.33 4.00


12 0.888 3.55104 118.37 9.86 13.3333
8 0.395 0.78912 26.30 2.19
8 0.395 3.95 3.08 0.26 333.33 Bh 4.00 Kg
JENIS
NO PEKERJAAN SAT DIMENSI
P L
1 PEMBERSIHAN LAPANGAN m2 16 8.0
2 PEK. BOUWPLANK m2 16 8.0
3 LUAS LAHAN m2
4 PEK GALIAN TANAH PONDASI m3 37.37 0.84
5 PEK URUGAN PASIR BAWA PONDASI m3 37.37 0.84
7 PAS. BATU KOSONG (AANSTAMPING) m3 37.37 0.84
8 PAS.BATU KALI m3 37.37
9 PEK.URUGAN TANAH KEMBALI m3

DIMENSI
NO JENIS PEKERJAAN SAT
P L
1 LUAS LAHAN PONDASI STENGAH m2
2 PEK GALIAN TANAH PONDASI STENGAH m3 40.53 0.59
3 PEK URUGAN PASIR BAWA PONDASI m3 40.53 0.59
4 PAS. BATU KOSONG (AANSTAMPING) m3 40.53 0.04
5 PAS.BATU KALI m3 40.53
6 PEK.URUGAN TANAH KEMBALI m3

DIMENSI
NO JENIS PEKERJAAN SAT
P/A L
1 PLAT TANGGA m3 4.5 0.9
2 PEK. ANAK TANGGA m3 0.3 0.9
3 PEK.PLAT BORDES 1 m3 1.8 0.6
5 BALOK BORDES 15/40 m3 1.80 0.15
7 PAS. KERAMIK BORDES m2 1.80 0.60
8 PAS. KERAMIK ANAK TANGGA m2 0.18 0.27
9 PAS.RELLING TANGGA m1 16.00
10 PEK.PLAT LANTAI 2 m1 26.64
11 PEK.PLAT ATAP m1 7.53 9.85
4. PEKERJAAN PLAFOND GYPSUM
DIMENSI
NO JENIS PEKERJAAN SAT
P/A L
1 Plafond Ruang Tamu m' 3.71 4.13
2 Plafond Ruang keluarga m' 4.23 4.13
3 Plafond Ruang Kamar Utama m' 3.12 2.7
4 Plafond Ruang Kamar 1 m' 2.7 3.12
5 Plafond Ruang Kamar 2 m' 3.12 4.24
JUMLAH
3. PEKERJAAN R.PLAFOND
DIMENSI
NO JENIS PEKERJAAN SAT
P L
1 Pekerjaan list plafond Tamu m' 3.71 4.13
2 Pekerjaan list plafond Ruang keluarga m' 4.23 4.13
3 Plafond Ruang Kamar Utama m' 3.12 2.7
4 Pekerjaan list plafond K.M 1 m' 2.7 3.12
5 Pekerjaan list plafond K.M 2 m' 3.12 4.24
JUMLAH

DIMENSI
NO JENIS PEKERJAAN SAT
P L
1 Pekerjaan Rangka Di dinding R.K m' 3.71 4.13
2 Pekerjaan Rangka Di dinding K.M m' 3.12 3.23
3 Pekerjaan Rangka Di dinding K.M 1 m' 2.7 3.12
4 Pekerjaan Rangka Di dinding K.M 2 m' 3.13 2.7
JUMLAH
DIMENSI
NO JENIS PEKERJAAN SAT
P L
1 Pekerjaan Rangka holllow R.K m' 3.71 4.13
2 Pekerjaan Rangka cross holllow Ruang Tamu m' 4.23 4.13
3 Pekerjaan Rangka cross holllow KM m' 3.12 2.7
4 Pekerjaan Rangka cross holllow KM 1 m' 2.7 3.12
5 Pekerjaan Rangka cross holllow KM 2 m' 3.12 4.24
JUMLAH
KEBUTUHAN RANGKA HOLLOW bh TOTAL

4 PEKERJAAN BAK KONTROL


DIMENSI
NO JENIS PEKERJAAN SAT
P L
1 Pekerjaan Galian Bak Kontrol m3 0.7 0.7
2 Pekerjaan Pas. Batu Bata m2 0.7
3 Pekerjaan Pleseran m2 0.7
5 PEKERJAAN SEPTICTANK
DIMENSI
NO JENIS PEKERJAAN SAT
P L
1 Pekerjaan Galian m3 2.8 1.5
2 Pekerjaan Pas. Batu Bata m2 2.8
3 Pekerjaan Pas. Batu Bata m2 1.5
4 Pekerjaan Pleseran m2 1.5
5 Pekerjaan Penutup m3 2.8 1.5
VOLUME
Tg LUAS
128.64
48.0
37.37
1.2 66.36
0.5 27.7
0.15 4.96
0.50 35.41
38.02

DIMENSI
VOLUME
Tg LUAS
40.53
1.2 28.70
0.5 12.0
0.15 0.25
0.41 16.76
11.48

DIMENSI
VOLUME
Tg UNIT
0.12 0.49
0.2 12 0.32
0.12 0.13
0.4 0.11
1.08
12 1.66
16.00
0.12 3.20
0.07 5.19

VOLUME

15.32
17.47
8.42
8.42
13.23
62.87 `

VOLUME

15.68
16.72
11.64
12
14.72
70.40

VOLUME

15.68
12.70
12
11.66
#REF!

VOLUME

15
17
8
8
13
62.87
62.87

VOLUME
DIMENSI
Tg
0.87 0.43
0.87 2.44
0.87 4.87
VOLUME
DIMENSI
Tg
1.71 7.18
1.71 4.79
1.71 7.35
1.71 14.71
0.12 0.50
NO. BENTUK / DIMENSI / UKURAN

1 2

PERHITUNGAN
Plat Tangga = 12

Bidang X = 0.90
Bidang Y = 4.50
Tebal Pengecoran = 0.12
Diameter Besi = 10.00
Jarak Tulangan = 0.15

2 PERHITUNGAN
Plat bordes = 12

Bidang X = 1.80
Bidang Y = 0.60
Tebal Pengecoran = 0.12
Diameter Besi = 10.00
Jarak Tulangan = 0.15
PERHITUNGAN
14 Anak Tangga = 12

Bidang X = 0.20
Bidang Y = 0.30
Tebal Pengecoran = 0.12
Diameter Besi = 10.00
Jarak Tulangan = 0.15
NO. BENTUK / DIMENSI / UKURAN

1 2

PERHITUNGAN
1 Plat Lantai = 12

Bidang X = 13.63
Bidang Y = 14.41
Tebal Pengecoran = 0.12
Diameter Besi = 10.00
Jarak Tulangan = 0.15

NO. BENTUK / DIMENSI / UKURAN

1 2

PERHITUNGAN
1 Penutup Septictank = 12

Bidang X = 1.50
Bidang Y = 2.80
Tebal Pengecoran = 0.10
Diameter Besi = 12.00
Jarak Tulangan = 0.15
NO. BENTUK / DIMENSI / UKURAN

1 2

PERHITUNGAN
1 Plat Atap = 7

Bidang X = 9.08
Bidang Y = 14.34
Tebal Pengecoran = 0.70
Diameter Besi = 10.00
Jarak Tulangan = 0.15
PERHITUNGAN VOLUME

1. Untuk Bidang 0,90 Meter


cm Panjang Besi (Pjb) = 4.50 M
Jumlah Baris Besi (Jb) = 6.00 M
0.90 M Jumlah Lapis (Jl) = 2.00 Lapis
4.50 M Diameter Besi (d) = 10.00 mm
0.12 M
10.00 mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
0.15 M = 33.275 Kg

2. Untuk Bidang 4,5 Meter


Panjang Besi (Pjb) = 0.90 M
Jumlah Baris Besi (Jb) = 30.00 M
Jumlah Lapis (Jl) = 2.00 Lapis
Diameter Besi (d) = 10.00 mm

Berat besi Ø 10, = Pjg*Jb*Jl*0.006162*d*d


= 33.275 Kg

Total Berat Besi = 66.55 Kg

Berat Besi Untuk 1 m3 = 136.93 Kg / M3 Beton

Luas Bekisting Untuk 1 = 8.333 M2 / M3 Beton

1. Untuk Bidang 1.80 Meter


cm Panjang Besi (Pjb) = 0.60 M
Jumlah Baris Besi (Jb) = 12.00 M
1.80 M Jumlah Lapis (Jl) = 2.00 Lapis
0.60 M Diameter Besi (d) = 10.00 mm
0.12 M
10.00 mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
0.15 M = 8.873 Kg
2. Untuk Bidang 0,6Meter
Panjang Besi (Pjb) = 1.80 M
Jumlah Baris Besi (Jb) = 4.00 M
Jumlah Lapis (Jl) = 2.00 Lapis
Diameter Besi (d) = 10.00 mm

Berat besi Ø 10, = Pjg*Jb*Jl*0.006162*d*d


= 8.873 Kg

Total Berat Besi = 17.75 Kg

Berat Besi Untuk 1 m3 = 136.93 Kg / M3 Beton

Luas Bekisting Untuk 1 = 8.333 M2 / M3 Beton

1. Untuk Bidang 1.80 Meter


cm Panjang Besi (Pjb) = 0.30 M
Jumlah Baris Besi (Jb) = 1.33 M
0.20 M Jumlah Lapis (Jl) = 2.00 Lapis
0.30 M Diameter Besi (d) = 10.00 mm
0.12 M
10.00 mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
0.15 M = 0.493 Kg

2. Untuk Bidang 2.70 Meter


Panjang Besi (Pjb) = 0.20 M
Jumlah Baris Besi (Jb) = 2.00 M
Jumlah Lapis (Jl) = 2.00 Lapis
Diameter Besi (d) = 10.00 mm

Berat besi Ø 10, = Pjg*Jb*Jl*0.006162*d*d


= 0.493 Kg

Total Berat Besi = 0.99 Kg

Berat Besi Untuk 1 m3 = 136.93 Kg / M3 Beton

Luas Bekisting Untuk 1 = 8.333 M2 / M3 Beton


PERHITUNGAN VOLUME

1. Untuk Bidang 7,08 Meter


cm Panjang Besi (Pjb) = 14.41 M
Jumlah Baris Besi (Jb) = 96.07 M
M Jumlah Lapis (Jl) = 2.00 Lapis
M Diameter Besi (d) = 10.00 mm
M
mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
M = 1706.037 Kg

2. Untuk Bidang 10,36 Meter


Panjang Besi (Pjb) = 13.63 M
Jumlah Baris Besi (Jb) = 90.87 M
Jumlah Lapis (Jl) = 2.00 Lapis
Diameter Besi (d) = 10.00 mm

Berat besi Ø 10, = Pjg*Jb*Jl*0.006162*d*d


= 1526.343 Kg

Total Berat Besi = 3,232.38 Kg

Berat Besi Untuk 1 m3 = 137.15 Kg / M3 Beton

Luas Bekisting Untuk 1 = 8.333 M2 / M3 Beton

PERHITUNGAN VOLUME

1. Untuk Bidang 1,50Meter


cm Panjang Besi (Pjb) = 2.80 M
Jumlah Baris Besi (Jb) = 18.67 M
M Jumlah Lapis (Jl) = 2.00 Lapis
M Diameter Besi (d) = 12.00 mm
M
mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
M = 92.755 Kg
2. Untuk Bidang 2,80 Meter
Panjang Besi (Pjb) = 1.50 M
Jumlah Baris Besi (Jb) = 10.00 M
Jumlah Lapis (Jl) = 2.00 Lapis
Diameter Besi (d) = 12.00 mm

Berat besi Ø 12, = Pjg*Jb*Jl*0.006162*d*d


= 26.620 Kg

Total Berat Besi = 119.38 Kg

Berat Besi Untuk 1 m3 = 284.23 Kg / M3 Beton

Luas Bekisting Untuk 1 = 10.000 M2 / M3 Beton

PERHITUNGAN VOLUME

1. Untuk Bidang 9,85 Meter


cm Panjang Besi (Pjb) = 14.34 M
Jumlah Baris Besi (Jb) = 95.60 M
M Jumlah Lapis (Jl) = 2.00 Lapis
M Diameter Besi (d) = 10.00 mm
M
mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
M = 1689.502 Kg

2. Untuk Bidang 7,53 Meter


Panjang Besi (Pjb) = 9.08 M
Jumlah Baris Besi (Jb) = 60.53 M
Jumlah Lapis (Jl) = 2.00 Lapis
Diameter Besi (d) = 10.00 mm

Berat besi Ø 10, = Pjg*Jb*Jl*0.006162*d*d


= 677.380 Kg

Total Berat Besi = 2,366.88 Kg

Berat Besi Untuk 1 m3 = 25.97 Kg / M3 Beton


Luas Bekisting Untuk 1 = 1.429 M2 / M3 Beton
0.01
0.62784
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Daun Pintu Panel Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0000 Rp 95,000.00 Rp 95,000.00
2 Tukang OH 3.0000 Rp 120,000.00 Rp 360,000.00
3 Kepala Tukang OH 0.3000 Rp 130,000.00 Rp 39,000.00
4 Mandor OH 0.0500 Rp 145,000.00 Rp 7,250.00
Jumlah Tenaga Kerja Rp 501,250.00
B. BAHAN
1 Balok Kayu kelas II M3 0.0400 Rp 3,150,000.0 Rp 126,000.00
2 Lem Kayu Kg 0.5000 Rp 250,000.00 Rp 125,000.00
Jumlah Bahan Rp 251,000.00
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 752,250.00
E Overhead & Profit 10% X D Rp 75,225.00
F Harga Satuan Pekerjaan ( D + E ) Rp 827,475.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Daun Jendela Kayu Kelas II


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.8000 Rp 95,000.00 Rp 76,000.00
2 Tukang OH 2.4000 Rp 120,000.00 Rp 288,000.00
3 Kepala Tukang OH 0.2400 Rp 130,000.00 Rp 31,200.00
4 Mandor OH 0.0400 Rp 145,000.00 Rp 5,800.00
Jumlah Tenaga Kerja Rp 401,000.00
B. BAHAN
1 Papan Kayu Kelas II M3 0.0240 Rp 5,000,000.0 Rp 120,000.00
2 Lem Kayu Kg 0.3000 Rp 250,000.00 Rp 75,000.00
Jumlah Bahan Rp 195,000.00
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 596,000.00
E Overhead & Profit 10% X D Rp 59,600.00
F Harga Satuan Pekerjaan ( D + E ) Rp 655,600.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Jelusi Kusen, Kayu Kelas I


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6700 Rp 95,000.00 Rp 63,650.00
2 Tukang OH 2.0000 Rp 120,000.00 Rp 240,000.00
3 Kepala Tukang OH 0.2000 Rp 130,000.00 Rp 26,000.00
4 Mandor OH 0.3350 Rp 145,000.00 Rp 48,575.00
Jumlah Tenaga Kerja Rp 378,225.00
B. BAHAN
1 Papan Kayu Kelas I M3 0.0600 Rp 5,000,000.0 Rp 300,000.00
2 Paku Kayu Kg 0.1500 Rp 18,000.00 Rp 2,700.00
Jumlah Bahan Rp 302,700.00
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 680,925.00
E Overhead & Profit 10% X D Rp 68,092.50
F Harga Satuan Pekerjaan ( D + E ) Rp 749,017.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kunci Silinder


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0050 Rp 95,000.00 Rp 475.00
2 Tukang OH 0.5000 Rp 120,000.00 Rp 60,000.00
3 Kepala Tukang OH 0.0500 Rp 130,000.00 Rp 6,500.00
4 Mandor OH 0.0030 Rp 145,000.00 Rp 435.00
Jumlah Tenaga Kerja Rp 67,410.00
B. BAHAN
1 Kunci Pintu Standar Bh 1.0000 Rp 150,000.00 Rp 150,000.00
Jumlah Bahan Rp 150,000.00
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 217,410.00
E Overhead & Profit 10% X D Rp 21,741.00
F Harga Satuan Pekerjaan ( D + E ) Rp 239,151.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Engsel Pintu


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 Rp 95,000.00 Rp 1,425.00
2 Tukang OH 0.1500 Rp 120,000.00 Rp 18,000.00
3 Kepala Tukang OH 0.0150 Rp 130,000.00 Rp 1,950.00
4 Mandor OH 0.0008 Rp 145,000.00 Rp 116.00
Jumlah Tenaga Kerja Rp 21,491.00
B. BAHAN
1 Engsel Pintu Bh 1.0000 Rp 36,200.00 Rp 36,200.00
Jumlah Bahan Rp 36,200.00
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 57,691.00
E Overhead & Profit 10% X D Rp 5,769.10
F Harga Satuan Pekerjaan ( D + E ) Rp 63,460.10

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Engsel Jendela Kupu_kupu


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 Rp 95,000.00 Rp 1,425.00
2 Tukang OH 0.1500 Rp 120,000.00 Rp 18,000.00
3 Kepala Tukang OH 0.0150 Rp 130,000.00 Rp 1,950.00
4 Mandor OH 0.0008 Rp 145,000.00 Rp 116.00
Jumlah Tenaga Kerja Rp 21,491.00
B. BAHAN
1 Engsel Jendela Bh 1.0000 Rp 21,000.00 Rp 21,000.00
Jumlah Bahan Rp 21,000.00
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 42,491.00
E Overhead & Profit 10% X D Rp 4,249.10
F Harga Satuan Pekerjaan ( D + E ) Rp 46,740.10

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Hak/Kait Angin Jendela


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 Rp 95,000.00 Rp 1,425.00
2 Tukang OH 0.1500 Rp 120,000.0 Rp 18,000.00
3 Kepala Tukang OH 0.0150 Rp 130,000.0 Rp 1,950.00
4 Mandor OH 0.0008 Rp 145,000.0 Rp 116.00
Jumlah Tenaga Kerja Rp 21,491.00
B. BAHAN
1 Hak Angin Jendela Bh 1.0000 Rp 15,700.00 Rp 15,700.00
Jumlah Bahan Rp 15,700.00
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 37,191.00
E Overhead & Profit 10% X D Rp 3,719.10
F Harga Satuan Pekerjaan ( D + E ) Rp 40,910.10

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Pacok Jendela


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 Rp 95,000.00 Rp 1,425.00
2 Tukang OH 0.1500 Rp 120,000.0 Rp 18,000.00
3 Kepala Tukang OH 0.0150 Rp 130,000.0 Rp 1,950.00
4 Mandor OH 0.0008 Rp 145,000.0 Rp 116.00
Jumlah Tenaga Kerja Rp 21,491.00
B. BAHAN
1 Pacok Jendela Bh 1.0000 Rp -
Jumlah Bahan Rp -
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 21,491.00
E Overhead & Profit 10% X D Rp 2,149.10
F Harga Satuan Pekerjaan ( D + E ) Rp 23,640.10

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Kusen Pintu dan Kusen Jendela, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 7.0000 Rp 95,000.00 Rp 665,000.00
2 Tukang OH 21.0000 Rp 120,000.0 Rp 2,520,000.00
3 Kepala Tukang OH 2.1000 Rp 130,000.0 Rp 273,000.00
4 Mandor OH 0.3500 Rp 145,000.0 Rp 50,750.00
Jumlah Tenaga Kerja Rp 3,508,750.0
B. BAHAN
1 Balok Kayu kelas I M3 1.1000 Rp 11,000,000 Rp 12,100,000.0
2 Paku kayu Kg 1.2500 Rp 18,000.00 Rp 22,500.00
3 Lem Kayu Kg 1.0000 Rp 250,000.0 Rp 250,000.00
Jumlah Bahan Rp 12,372,500.0
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 15,881,250
E Overhead & Profit 10% X D Rp 1,588,125.00
F Harga Satuan Pekerjaan ( D + E ) Rp 17,469,375.0
1. PEKERJAAN KUSEN

DIMENSI
NO JENIS PEKERJAAN SAT
P LUAS P.BALOK
1 Pekerjaan Pintu
Pekerjaan Kusen Pintu + Jendela m2 9.14 0.0075
Pekerjaan Daun Pintu 2 m2 2.52
Pekerjaan Kaca jendela mati 5 mm m2 0.3 0.3
Pekerjaan Engsel pintu 6 bh
Pekerjaan Kunci 1 bh

Pekerjaan Kusen Pintu + Jendela m2 7.7 0.0075


Pekerjaan Daun Pintu m2 1.89
Pekerjaan Kaca jendela mati 5 mm m2 1.7 0.4
Pekerjaan Engsel pintu 3 bh
Pekerjaan Kunci 1 bh

Pekerjaan Kusen Pintu m2 5.1 0.0075


Pekerjaan Daun Pintu m2 1.89
Pekerjaan Engsel pintu 3 bh
Pekerjaan Kunci 1 bh

2 Pekerjaan Jendela
Pekerjaan Kusen m2 11.12 0.0075
Pekerjaan Daun m2 1.7 0.3
Pekerjaan Kaca 5 mm m2 1.54 0.3
Pekerjaan Kaca 5 mm m2 0.3 0.3
Pekerjaan Engsel 2 bh
Pekerjaan Kunci 1 bh
Pekerjaan Hak Angin 1 bh

Pekerjaan Kusen m2 7.48 0.0075


Pekerjaan Daun m2 1.7 0.3
Pekerjaan Kaca 5 mm m2 1.54 0.3
Pekerjaan Engsel 3 bh
Pekerjaan Kunci 1 bh
Pekerjaan Hak Angin 1 bh

Pekerjaan Kusen m2 2.30 0.0075


Pekerjaan Daun m2 1.7 0.4
Pekerjaan Kaca 5 mm m2 1.54 0.4
Pekerjaan Engsel 2 bh
Pekerjaan Kunci 1 bh
Pekerjaan Hak Angin 1 bh

3 Pekerjaan Ventilasi
1 Pekerjaan Kusen Ventilasi Type 1 m2 3.27 0.0075

2 Pekerjaan Kusen Ventilasi Type 2 m2 2.69 0.0075

3 Pekerjaan Kusen Ventilasi Type 3 m2 1.98 0.0075

4 Pekerjaan Kusen Ventilasi Type 4 m2 2.75 0.0075

5 Pekerjaan Kusen Ventilasi Type 5 m2 1 0.0075

6 Pekerjaan Kusen Ventilasi Wc m2 1.8 0.0075


Pekerjaan Kaca 5 mm m2 0.3 0.3

3 Pekerjaan Ventilasi
1 Pekerjaan Kusen Ventilasi Type 1 m2 12.76 0.0075
Pekerjaan Kaca 5 mm m2 0.4 5.78
2 Pekerjaan Kusen Ventilasi Type 2 m2 7 0.0075
Pekerjaan Kaca 5 mm m2 2.9 0.4
ENSI
VOLUME
UNIT

1 0.07
1 2.52
5 0.45
1 6.00
1 1.00

2 0.12
2 3.78
2 1.36
2 6.00
2 2.00

4 0.15
4 7.56
4 12.00
4 4.00

1 0.08
2 0.10
2 0.92
5 0.45
2 4.00
2 2.00
2 2.00

1 0.06
2 0.10
2 0.92
2 6.00
2 2.00
2 2.00

2 0.03
2 0.13
2 1.23
2 4.00
2 2.00
2 2.00

1 0.02
0:09
1 0.02

1 0.01

1 0.02

1 0.01

1 0.01
1 0.09

1 0.10
1 2.31
1 0.05
1 1.16
ANALISA MEP

PS 1 Memasang 1 buah kloset duduk

A Bahan
- Klosed duduk 1.000 Bh x Rp. 2,550,000 = Rp. 2,550,000.00
- Perlengkapan 6% harga klosed x Rp. 2,550,000 = Rp. 153,000.00
Jumlah (A) = Rp. 2,703,000.00
B Tenaga
- Pekerja 1.200 Oh x Rp. 95,000 = Rp. 114,000.00
- Tukang batu 1.100 Oh x Rp. 120,000 = Rp. 132,000.00
- Kepala tukang 0.001 Oh x Rp. 130,000 = Rp. 130.00
- Mandor 0.060 Oh x Rp. 145,000 = Rp. 8,700.00
Jumlah (B) = Rp. 254,830.00
C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 2,957,830.00


E Overhead & Profit 10% 295,783.00
F Harga Satuan Pekerjaaan (D+E) 3,253,613.00

PS 1 Memasang 1 buah Washtafel

A Bahan
- Washtafel 1.000 Bh x Rp. 1,250,000 = Rp. 1,250,000.00
- Perlengkapan 6% harga klosed x Rp. 1,250,000 = Rp. 75,000.00
Jumlah (A) = Rp. 1,325,000.00
B Tenaga
- Pekerja 3.300 Oh x Rp. 95,000 = Rp. 313,500.00
- Tukang batu 1.100 Oh x Rp. 120,000 = Rp. 132,000.00
- Kepala tukang 0.001 Oh x Rp. 130,000 = Rp. 130.00
- Mandor 0.160 Oh x Rp. 145,000 = Rp. 23,200.00
Jumlah (B) = Rp. 468,830.00
C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 1,793,830.00


E Overhead & Profit 10% 179,383.00
F Harga Satuan Pekerjaaan (D+E) 1,973,213.00

PS 1 Memasang 1 buah Urinoir

A Bahan
- Urinoir 1.000 Bh x Rp. 2,705,000 = Rp. 2,705,000.00
- Perlengkapan 6% harga klosed x Rp. 2,705,000 = Rp. 162,300.00
Jumlah (A) = Rp. 2,867,300.00
B Tenaga
- Pekerja 3.300 Oh x Rp. 95,000 = Rp. 313,500.00
- Tukang batu 1.100 Oh x Rp. 120,000 = Rp. 132,000.00
- Kepala tukang 0.001 Oh x Rp. 130,000 = Rp. 130.00
- Mandor 0.160 Oh x Rp. 145,000 = Rp. 23,200.00
Jumlah (B) = Rp. 468,830.00
C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 3,336,130.00


E Overhead & Profit 10% 333,613.00
F Harga Satuan Pekerjaaan (D+E) 3,669,743.00

PS 6.20. Memasang 1 m' pipa galvalium diameter 3/4"

A Bahan
- Pipa galvalium 3/4 1.200 M´ x Rp. 44,673 = Rp. 53,608.00
- Perlengkapan 35% Harga Pipa x Rp. 44,673 = Rp. 15,635.67
Jumlah (1) = Rp. 69,243.67
V Tenaga
- Pekerja 0.054 Oh x Rp. 95,000 = Rp. 5,130.00
- Tukang pipa 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.027 Oh x Rp. 145,000 = Rp. 3,915.00
Jumlah (2) = Rp. 21,015.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 90,258.67


E Overhead & Profit 10% 9,025.87
F Harga Satuan Pekerjaaan (D+E) 99,284.53

PS 6.20. Memasang 1 m' pipa galvalium diameter 2"

A Bahan
- Pipa galvalium 3/4 1.200 M´ x Rp. 141,193 = Rp. 169,432.00
- Perlengkapan 35% Harga Pipa x Rp. 141,193 = Rp. 49,417.67
Jumlah (1) = Rp. 218,849.67
V Tenaga
- Pekerja 0.054 Oh x Rp. 95,000 = Rp. 5,130.00
- Tukang pipa 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.027 Oh x Rp. 145,000 = Rp. 3,915.00
Jumlah (2) = Rp. 21,015.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 239,864.67


E Overhead & Profit 10% 23,986.47
F Harga Satuan Pekerjaaan (D+E) 263,851.13

PS 6.20. Memasang 1 m' pipa galvalium diameter 1.5"

A Bahan
- Pipa galvalium 3/4 1.200 M´ x Rp. 92,007 = Rp. 110,408.00
- Perlengkapan 35% Harga Pipa x Rp. 92,007 = Rp. 32,202.33
Jumlah (1) = Rp. 142,610.33
V Tenaga
- Pekerja 0.054 Oh x Rp. 95,000 = Rp. 5,130.00
- Tukang pipa 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.027 Oh x Rp. 145,000 = Rp. 3,915.00
Jumlah (2) = Rp. 21,015.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 163,625.33


E Overhead & Profit 10% 16,362.53
F Harga Satuan Pekerjaaan (D+E) 179,987.87

PS 6.20. Memasang 1 m' pipa galvalium diameter 1"

A Bahan
- Pipa galvalium 3/4 1.200 M´ x Rp. 61,420 = Rp. 73,704.00
- Perlengkapan 35% Harga Pipa x Rp. 61,420 = Rp. 21,497.00
Jumlah (1) = Rp. 95,201.00
V Tenaga
- Pekerja 0.054 Oh x Rp. 95,000 = Rp. 5,130.00
- Tukang pipa 0.090 Oh x Rp. 120,000 = Rp. 10,800.00
- Kepala tukang 0.009 Oh x Rp. 130,000 = Rp. 1,170.00
- Mandor 0.027 Oh x Rp. 145,000 = Rp. 3,915.00
Jumlah (2) = Rp. 21,015.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 116,216.00


E Overhead & Profit 10% 11,621.60
F Harga Satuan Pekerjaaan (D+E) 127,837.60

PS 6.31. Memasang 1 m' pipa PVC tipe AW diameter 3"

A Bahan
- Pipa PVC 1.200 M´ x Rp. 36,000 = Rp. 43,200.00
- Perlengkapan 35% harga pipa x Rp. 36,000 = Rp. 12,600.00
Jumlah (1) = Rp. 55,800.00
B Tenaga
- Pekerja 0.081 Oh x Rp. 95,000 = Rp. 7,695.00
- Tukang Pipa 0.135 Oh x Rp. 12,000 = Rp. 1,620.00
- Kepala tukang 0.0135 Oh x Rp. 132,000 = Rp. 1,782.00
- Mandor 0.0041 Oh x Rp. 145,000 = Rp. 594.50
Jumlah (2) = Rp. 11,691.50

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 67,491.50


E Overhead & Profit 10% 6,749.15
F Harga Satuan Pekerjaaan (D+E) 74,240.65

PS 6.32. Memasang 1 m' pipa PVC tipe AW diameter 4"


A Bahan
- Pipa PVC 1.200 M´ x Rp. 57,000 = Rp. 68,400.00
- Perlengkapan 35% harga pipa x Rp. 57,000 = Rp. 19,950.00
Jumlah (1) = Rp. 88,350.00
B Tenaga
- Pekerja 0.081 Oh x Rp. 95,000 = Rp. 7,695.00
- Tukang batu 0.135 Oh x Rp. 12,000 = Rp. 1,620.00
- Kepala tukang 0.0135 Oh x Rp. 132,000 = Rp. 1,782.00
- Mandor 0.0041 Oh x Rp. 145,000 = Rp. 594.50
Jumlah (2) = Rp. 11,691.50

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 100,041.50


E Overhead & Profit 10% 10,004.15
F Harga Satuan Pekerjaaan (D+E) 110,045.65

PS 6.32. Memasang 1 m' pipa PVC tipe AW diameter 6"


A Bahan
- Pipa PVC 1.200 M´ x Rp. 127,000 = Rp. 152,400.00
- Perlengkapan 35% harga pipa x Rp. 127,000 = Rp. 44,450.00
Jumlah (1) = Rp. 196,850.00
B Tenaga
- Pekerja 0.081 Oh x Rp. 95,000 = Rp. 7,695.00
- Tukang batu 0.135 Oh x Rp. 120,000 = Rp. 16,200.00
- Kepala tukang 0.0135 Oh x Rp. 130,000 = Rp. 1,755.00
- Mandor 0.0041 Oh x Rp. 145,000 = Rp. 594.50
Jumlah (2) = Rp. 26,244.50
C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 223,094.50


E Overhead & Profit 10% 22,309.45
F Harga Satuan Pekerjaaan (D+E) 245,403.95

PS 6.34. Memasang 1 bh bak cuci piring

A Bahan
- Bak cuci teraso 1.000 Bh x Rp. 750,000 = Rp. 750,000.00
- Water drain + asesories 1.000 Bh x Rp. 36,000 = Rp. 36,000.00
- Semen portland 20.000 Kg x Rp. 1,520 = Rp. 30,400.00
- Pasir 0.050 M³ x Rp. 115,000 = Rp. 5,750.00
Jumlah (A) = Rp. 822,150.00
B Tenaga
- Pekerja 0.050 Oh x Rp. 95,000 = Rp. 4,750.00
- Tukang batu 0.500 Oh x Rp. 120,000 = Rp. 60,000.00
- Kepala tukang 0.050 Oh x Rp. 132,000 = Rp. 6,600.00
- Mandor 0.0025 Oh x Rp. 145,000 = Rp. 362.50
Jumlah (B) = Rp. 71,712.50

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 893,862.50


E Overhead & Profit 10% 89,386.25
F Harga Satuan Pekerjaaan (D+E) 983,248.75

PS 6.35. Memasang 1 bh kran diameter ¾" atau ½"

A Bahan
- Kran air 1.000 Bh x Rp. 85,500 = Rp. 85,500.00
- Seal tape 0.025 Bh x Rp. 4,500 = Rp. 112.50
Jumlah (1) = Rp. 85,612.50

B Tenaga
- Pekerja 0.010 Oh x Rp. 95,000 = Rp. 950.00
- Tukang Pipa 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 132,000 = Rp. 1,320.00
- Mandor 0.005 Oh x Rp. 145,000 = Rp. 725.00
Jumlah (2) 14,995.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 100,607.50


E Overhead & Profit 10% 10,060.75
F Harga Satuan Pekerjaaan (D+E) 110,668.25

PS 6.35. Memasang 1 bh kran leher angsa

A Bahan
- Kran Leher angsa 1.000 Bh x Rp. 127,000 = Rp. 127,000.00
- Seal tape 0.025 Bh x Rp. 4,500 = Rp. 112.50
Jumlah (1) = Rp. 127,112.50

B Tenaga
- Pekerja 0.010 Oh x Rp. 95,000 = Rp. 950.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 132,000 = Rp. 1,320.00
- Mandor 0.005 Oh x Rp. 145,000 = Rp. 725.00
Jumlah (2) 14,995.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 142,107.50


E Overhead & Profit 10% 14,210.75
F Harga Satuan Pekerjaaan (D+E) 156,318.25

PS 6.36. Memasang 1 bh Floor drain

A Bahan
- Floor drain 1.000 Bh x Rp. 21,000 = Rp. 21,000.00
Jumlah (1) = Rp. 21,000.00

B Tenaga
- Pekerja 0.010 Oh x Rp. 95,000 = Rp. 950.00
- Tukang batu 0.100 Oh x Rp. 120,000 = Rp. 12,000.00
- Kepala tukang 0.010 Oh x Rp. 132,000 = Rp. 1,320.00
- Mandor 0.005 Oh x Rp. 145,000 = Rp. 725.00
Jumlah (2) 14,995.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 35,995.00


E Overhead & Profit 10% 3,599.50
F Harga Satuan Pekerjaaan (D+E) 39,594.50

PL 7.1 1 Bh Pasangan Stop Kontak

A Bahan
- Stop Kontak 1.0000 Bh x Rp. 29,500.00 = Rp. 29,500.00
Jumlah (1) = Rp. 29,500.00
B Tenaga
- Pekerja 0.200 Oh x Rp. 95,000.00 = Rp. 19,000.00
- Tukang Listrik 0.020 Oh x Rp. 120,000.00 = Rp. 2,400.00
- Kepala tukang Listrik 0.010 Oh x Rp. 130,000.00 = Rp. 1,300.00
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp. 1,450.00
Jumlah (2) = Rp. 24,150.00
C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 53,650.00


E Overhead & Profit 10% 5,365.00
F Harga Satuan Pekerjaaan (D+E) 59,015.00

PL 7.3 1 Bh Pasangan Saklar Ganda

7.3.1 Bahan
- Saklar Ganda 1.0000 Bh x Rp. 36,500.00 = Rp. 36,500.00
Jumlah (1) = Rp. 36,500.00
7.3.2 Tenaga
- Pekerja 0.400 Oh x Rp. 95,000.00 = Rp. 38,000.00
- Tukang Listrik 0.040 Oh x Rp. 120,000.00 = Rp. 4,800.00
- Kepala tukang Listrik 0.010 Oh x Rp. 130,000.00 = Rp. 1,300.00
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp. 1,450.00
Jumlah (2) = Rp. 45,550.00
C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 82,050.00


E Overhead & Profit 10% 8,205.00
F Harga Satuan Pekerjaaan (D+E) 90,255.00

PL 7.4 1 Bh Pasangan Saklar Tunggal

A Bahan
- Saklar Tunggal 1.0000 Bh x Rp. 26,000.00 = Rp. 26,000.00
Jumlah (1) = Rp. 26,000.00
B Tenaga
- Pekerja 0.400 Oh x Rp. 95,000.00 = Rp. 38,000.00
- Tukang Listrik 0.040 Oh x Rp. 120,000.00 = Rp. 4,800.00
- Kepala tukang Listrik 0.010 Oh x Rp. 130,000.00 = Rp. 1,300.00
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp. 1,450.00
Jumlah (2) = Rp. 45,550.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 71,550.00


E Overhead & Profit 10% 7,155.00
F Harga Satuan Pekerjaaan (D+E) 78,705.00

PL 7.5 1 Bh Pasangan Mcb

A Bahan
- MCB 1.0000 Bh x Rp. 45,500.00 = Rp. 45,500.00
Jumlah (1) = Rp. 45,500.00
B Tenaga
- Pekerja 0.400 Oh x Rp. 95,000.00 = Rp. 38,000.00
- Tukang Listrik 0.040 Oh x Rp. 120,000.00 = Rp. 4,800.00
- Kepala tukang Listrik 0.040 Oh x Rp. 130,000.00 = Rp. 5,200.00
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp. 1,450.00
Jumlah (2) = Rp. 49,450.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 94,950.00


E Overhead & Profit 10% 9,495.00
F Harga Satuan Pekerjaaan (D+E) 104,445.00

PL 7.5 A 1 Bh Pasangan Titik Lampu DL

A Bahan
- Err:540 1.0000 Bh x Rp. 61,500.00 = Rp. 61,500.00
- Pipa pvc 2.2000 m' x Rp. 1,153.85 = Rp. 2,538.46
- Kabel NYA 3 X 2.5 11.1000 M' x Rp. 12,850.00 = Rp. 142,635.00
Jumlah (1) = Rp. 206,673.46
B Tenaga
- Pekerja 0.200 Oh x Rp. 95,000.00 = Rp. 19,000.00
- Tukang Listrik 0.020 Oh x Rp. 120,000.00 = Rp. 2,400.00
- Kepala tukang Listrik 0.020 Oh x Rp. 130,000.00 = Rp. 2,600.00
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp. 1,450.00
Jumlah (2) = Rp. 25,450.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 232,123.46


E Overhead & Profit 10% 23,212.35
F Harga Satuan Pekerjaaan (D+E) 255,335.81

PL 7.5 B 1 Bh Pasangan Titik Lampu RM

7.5.1 Bahan
- RM 300 GLOSS ALML Reflektor 2x 18 W 1.0000 Bh x Rp. 225,000.00 = Rp. 225,000.00
- Pipa pvc 2.2000 m' x Rp. 1,153.85 = Rp. 2,538.46
- Kabel NYA 3 X 2.5 11.1000 M' x Rp. 12,850.00 = Rp. 142,635.00
Jumlah (1) = Rp. 370,173.46
7.5.2 Tenaga
- Pekerja 0.200 Oh x Rp. 95,000.00 = Rp. 19,000.00
- Tukang Listrik 0.020 Oh x Rp. 120,000.00 = Rp. 2,400.00
- Kepala tukang Listrik 0.020 Oh x Rp. 130,000.00 = Rp. 2,600.00
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp. 1,450.00
Jumlah (2) = Rp. 25,450.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 395,623.46


E Overhead & Profit 10% 39,562.35
F Harga Satuan Pekerjaaan (D+E) 435,185.81

7.5 A 1 Bh Pasangan Titik Lampu DL

A Bahan
- Lampu Down Light Philip 1.0000 Bh x Rp. 89,000.00 = Rp. 89,000.00
- Pipa pvc 2.2000 m' x Rp. 5,000.00 = Rp. 11,000.00
- Kabel NYA 3 X 2.5 11.1000 M' x Rp. 12,850.00 = Rp. 142,635.00
Jumlah (1) = Rp. 242,635.00
B Tenaga
- Pekerja 0.200 Oh x Rp. 95,000.00 = Rp. 19,000.00
- Tukang Listrik 0.020 Oh x Rp. 120,000.00 = Rp. 2,400.00
PL - Kepala tukang Listrik 0.020 Oh x Rp. 130,000.00 = Rp. 2,600.00
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp. 1,450.00
Jumlah (2) = Rp. 25,450.00

C PERALATAN
Katrol electrik
Jumlah (C) = Rp. 0.00

D Jumlah (A+B+C) 268,085.00


E Overhead & Profit 10% 26,808.50
F Harga Satuan Pekerjaaan (D+E) 294,893.50

7.5.1 Bahan
- Fitting TL 1.0000 Bh x Rp. 134,500.00 = Rp. 134,500.00
- Pipa pvc 2.2000 m' x Rp. 21,794.87 = Rp. 47,948.72
- Kabel NYA 3 X 2.5 11.1000 M' x Rp. 12,850.00 = Rp. 142,635.00
PL Jumlah (1) = Rp. 325,083.72
7.5.2 Tenaga
- Pekerja 0.200 Oh x Rp. 95,000.00 = Rp. 19,000.00
- Tukang Listrik 0.020 Oh x Rp. 120,000.00 = Rp. 2,400.00
- Kepala tukang Listrik 0.020 Oh x Rp. 130,000.00 = Rp. 2,600.00
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp. 1,450.00
Jumlah (2) = Rp. 25,450.00
Jumlah (1) +(2) = Rp. 350,533.72

7.6 Pemasangan Instalasi Pelaluan Arde Panel Meter

7.6.1 Bahan
- Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 2.0000 Btg x Rp. 14,500.00 = Rp. 29,000.00
- Keni Pipa PVC 1/2" (Putih) 2.0000 Bh x Rp. 4,000.00 = Rp. 8,000.00
- Kabel 10 mm 2.2000 m' x Rp. 8,340.00 = Rp. 18,348.00
Jumlah (1) = Rp. 55,348.00
7.5.2 Tenaga
- Pekerja 0.300 Oh x Rp. 95,000.00 = Rp. 28,500.00
- Tukang Listrik 0.036 Oh x Rp. 120,000.00 = Rp. 4,320.00
- Kepala tukang Listrik 0.030 Oh x Rp. 130,000.00 = Rp. 3,900.00
- Mandor 0.010 Oh x Rp. 145,000.00 = Rp. 1,450.00
Jumlah (2) = Rp. 38,170.00
Jumlah (1) +(2) = Rp. 93,518.00