2 Pondasi Footplate
- Pek. Galian tanah m3 A.2.3.1.1. 0.59 Rp 86,625.00 Rp 50,935.50
- Pek. Urugan Pasir 10 cm m3 A.2.3.1.11. 0.10 Rp 350,618.00 Rp 34,360.56
- Beton K-250 m3 A.4.1.1.8. 0.26 Rp 1,415,696.00 Rp 361,002.48
- Besi kg A.4.1.1.17 24.96 Rp 18,161.00 Rp 453,298.56
- Bekisting m2 A.4.1.1.20 2.4 Rp 229,944.00 Rp 551,865.60
B PEKERJAAN BETON
1 Sloof 20 x 25 K-250
- Beton K 250 m3 A.4.1.1.8. 1.80 Rp 1,415,696.00 Rp 2,548,252.80
- Besi kg A.4.1.1.17 359.62 Rp 18,161.00 Rp 6,531,080.76
- Bekisting m2 A.4.1.1.21 9.00 Rp 245,344.00 Rp 2,208,096.00
2 Kolom 25 x 25 K-250
- Beton K 250 m3 A.4.1.1.8. 0.17 Rp 1,415,696.00 Rp 238,898.70
- Besi kg A.4.1.1.17 19.61 Rp 18,161.00 Rp 356,152.76
- Bekisting m2 A.4.1.1.22 1.35 Rp 428,747.00 Rp 578,808.45
3 Kolom Praktis 15 x 15 K-250
- Beton K 250 m3 A.4.1.1.8. 0.64 Rp 1,415,696.00 Rp 903,037.09
- Besi kg A.4.1.1.17 53.01 Rp 18,161.00 Rp 962,649.23
- Bekisting m2 A.4.1.1.22 3.95 Rp 428,747.00 Rp 1,693,014.72
5 Plat Lantai
- Urugan Pasir Ruang Ibadah m3 A.2.3.1.11. 3.42 Rp 350,618.00 Rp 1,200,779.00
- Pek. Timbunan Tanah m3 A.2.3.1.9. 24.00 Rp 31,625.00 Rp 759,000.00
- Pek. Timbunan Tanah Ruang Ibadah m3 A.2.3.1.9. 10.27 Rp 31,625.00 Rp 324,923.16
- Pas. Bata m2 A.4.4.1.9 9.44 Rp 115,975.00 Rp 1,094,804.00
6 Rabat beton
- Beton K-100 m3 A.4.1.1.1 8.05 Rp 1,267,426.00 Rp 10,197,709.60
- Bekisting m2 A.4.1.1.24 8.80 Rp 538,747.00 Rp 4,740,973.60
Rp 51,940,137.63
B PEKERJAAN BETON
1 Sloof 20 x 25 K-250
- Beton K 250 m3 A.4.1.1.8. 3.60 Rp 1,415,696.00 Rp 5,096,505.60
- Besi kg A.4.1.1.17 846.482449 Rp 18,161.00 Rp 15,372,967.76
- Bekisting m2 A.4.1.1.21 24 Rp 245,344.00 Rp 5,888,256.00
2 Kolom Praktis 15 x 15 K-250
- Beton K 250 m3 A.4.1.1.8. 2.70 Rp 1,415,696.00 Rp 3,823,398.50
- Besi kg A.4.1.1.17 417.16 Rp 18,161.00 Rp 7,575,959.22
- Bekisting m2 A.4.1.1.22 14.58 Rp 428,747.00 Rp 6,251,131.26
3 Ring lintel 15 x 15 K-250
- Beton K 250 m3 A.4.1.1.8. #NAME? Rp 766,811.00 #NAME?
- Besi kg A.4.1.1.17 #NAME? Rp 23,438.00 #NAME?
- Bekisting m2 A.4.1.1.23 #NAME? Rp 443,597.00 #NAME?
4 Ring balok 15 x 20 K-250
- Beton K 250 m3 #REF! 2.16 Rp 766,811.00 Rp 1,656,311.76
- Besi kg #REF! 574.7884836667 Rp 23,438.00 Rp 13,471,892.48
- Bekisting m2 #REF! 18.00 Rp 443,597.00 Rp 7,984,746.00
5 Plat Lantai
- Urugan Pasir m3 A.2.3.1.11. 26.40 Rp 350,618.00 Rp 9,256,315.20
NO. JENIS PEKERJAAN SATUAN KODE VOLUME HARGA SATUAN JUMLAH
- Pek. Timbunan Tanah m3 A.2.3.1.9. 0.00 Rp 31,625.00 Rp -
6 Rabat beton
- Beton K-100 m3 A.4.1.1.1 36.00 Rp 1,267,426.00 Rp 45,627,336.00
- Bekisting m2 A.4.1.1.24 0.00 Rp 538,747.00 Rp -
A PEKERJAAN PONDASI
1 Pondasi Menerus
- Pek. Galian tanah m3 A.2.3.1.1. 39.36 Rp 86,625.00 Rp 3,409,560.00
- Pek. Timbunan Tanah m3 A.2.3.1.9. 13.12 Rp 31,625.00 Rp 414,920.00
- Pek. Urugan Pasir 10 cm m3 A.2.3.1.11. 4.92 Rp 350,618.00 Rp 1,725,040.56
- Pas Batu Belah 1:5 m3 A.3.2.1.3. 13.07 Rp 989,876.00 Rp 12,936,441.98
- Pas. Aanstamping m3 A.3.2.1.9. 9.84 Rp 633,069.00 Rp 6,229,398.96
B PEKERJAAN BETON
1 Sloof 20 x 25 K-250
- Beton K 250 m3 A.4.1.1.8. 3.08 Rp 1,415,696.00 Rp 4,353,265.20
- Besi kg A.4.1.1.17 607.28 Rp 18,161.00 Rp 11,028,761.37
- Bekisting m2 A.4.1.1.21 15.38 Rp 245,344.00 Rp 3,772,164.00
2 Kolom Praktis 15 x 15 K-250
- Beton K 250 m3 A.4.1.1.8. 1.73 Rp 1,415,696.00 Rp 2,451,100.66
- Besi kg A.4.1.1.17 25.8876 Rp 18,161.00 Rp 470,144.70
- Bekisting m2 A.4.1.1.22 5.77125 Rp 428,747.00 Rp 2,474,406.12
3 Ring balok 12 x 18 K-250
- Beton K 250 m3 #REF! 1.38 Rp 766,811.00 Rp 1,061,074.72
- Besi kg #REF! 384.61 Rp 23,438.00 Rp 9,014,421.21
- Bekisting m2 #REF! 9.23 Rp 443,597.00 Rp 4,092,182.33
4 Ring lintel 15 x 15 K-250
- Beton K 250 m3 A.4.1.1.8. 0.67 Rp 766,811.00 Rp 513,456.65
- Besi kg A.4.1.1.17 187.01 Rp 23,438.00 Rp 4,383,032.44
- Bekisting m2 A.4.1.1.23 5.58 Rp 443,597.00 Rp 2,475,271.26
5 Plat Lantai
- Urugan Pasir m3 A.2.3.1.11. 8.00 Rp 350,618.00 Rp 2,804,944.00
- Pek. Timbunan Tanah m3 A.2.3.1.9. 24.00 Rp 31,625.00 Rp 759,000.00
6 Rabat beton
- Beton K-100 m3 A.4.1.1.1 8.05 Rp 1,267,426.00 Rp 10,197,709.60
- Bekisting m2 A.4.1.1.24 8.80 Rp 538,747.00 Rp 4,740,973.60
B PEKERJAAN BETON
1 Sloof 20 x 25 K-250
- Beton K 250 m3 A.4.1.1.8. 2.04 Rp 1,415,696.00 Rp 2,892,266.93
- Besi kg A.4.1.1.17 406.82 Rp 18,161.00 Rp 7,388,285.77
- Bekisting m2 A.4.1.1.21 10.22 Rp 245,344.00 Rp 2,506,188.96
2 Kolom Praktis 15 x 15 K-250
- Beton K 250 m3 A.4.1.1.8. 1.37 Rp 1,415,696.00 Rp 1,935,079.47
- Besi kg A.4.1.1.17 53.01 Rp 18,161.00 Rp 962,649.23
- Bekisting m2 A.4.1.1.22 4.55625 Rp 428,747.00 Rp 1,953,478.52
3 Ring lintel 15 x 15 K-250
- Beton K 250 m3 A.4.1.1.8. 0.49 Rp 766,811.00 Rp 372,670.15
NO. JENIS PEKERJAAN SATUAN KODE VOLUME HARGA SATUAN JUMLAH
- Besi kg A.4.1.1.17 136.19 Rp 23,438.00 Rp 3,191,944.53
- Bekisting m2 A.4.1.1.23 4.05 Rp 443,597.00 Rp 1,796,567.85
3 Ring balok 15 x 20 K-250
- Beton K 250 m3 #REF! 0.92 Rp 766,811.00 Rp 704,967.69
- Besi kg #REF! 256.09 Rp 23,438.00 Rp 6,002,206.95
- Bekisting m2 #REF! 6.13 Rp 443,597.00 Rp 2,718,806.01
4 Plat Lantai
- Urugan Pasir m3 A.2.3.1.11. 8.00 Rp 350,618.00 Rp 2,804,944.00
- Pek. Timbunan Tanah m3 A.2.3.1.9. 24.00 Rp 31,625.00 Rp 759,000.00
5 Rabat beton
- Beton K-100 m3 A.4.1.1.1 8.05 Rp 1,267,426.00 Rp 10,197,709.60
- Bekisting m2 A.4.1.1.24 8.80 Rp 538,747.00 Rp 4,740,973.60
6 Panggung
- timbunan m3 A.2.3.1.9. 5.13 Rp 31,625.00 Rp 162,236.25
- Pas. Bata m2 A.4.4.1.9 4.68 Rp 115,975.00 Rp 543,226.90
- Beton K 150 m3 A.4.1.1.2 1.63 Rp 1,299,793.00 Rp 2,125,083.57
B PEKERJAAN BETON
1 Sloof 20 x 25 K-250
- Beton K 250 m3 A.4.1.1.8. 2.04 Rp 1,415,696.00 Rp 2,892,266.93
- Besi kg A.4.1.1.17 406.82 Rp 18,161.00 Rp 7,388,285.77
- Bekisting m2 A.4.1.1.21 10.22 Rp 245,344.00 Rp 2,506,188.96
2 Kolom Praktis 15 x 15 K-250
- Beton K 250 m3 A.4.1.1.8. 1.37 Rp 1,415,696.00 Rp 1,935,079.47
- Besi kg A.4.1.1.17 53.0064 Rp 18,161.00 Rp 962,649.23
- Bekisting m2 A.4.1.1.22 4.55625 Rp 428,747.00 Rp 1,953,478.52
3 Ring lintel 15 x 15 K-250
- Beton K 250 m3 A.4.1.1.8. 0.49 Rp 766,811.00 Rp 372,670.15
- Besi kg A.4.1.1.17 136.19 Rp 23,438.00 Rp 3,191,944.53
- Bekisting m2 A.4.1.1.23 4.05 Rp 443,597.00 Rp 1,796,567.85
3 Ring balok 15 x 20 K-250
- Beton K 250 m3 #REF! 0.92 Rp 766,811.00 Rp 704,967.69
- Besi kg #REF! 256.09 Rp 23,438.00 Rp 6,002,206.95
- Bekisting m2 #REF! 6.13 Rp 443,597.00 Rp 2,718,806.01
4 Plat Lantai
- Urugan Pasir m3 A.2.3.1.11. 8.00 Rp 350,618.00 Rp 2,804,944.00
- Pek. Timbunan Tanah m3 A.2.3.1.9. 24.00 Rp 31,625.00 Rp 759,000.00
5 Rabat beton Rp -
- Beton K-100 m3 A.4.1.1.1 8.05 Rp 1,267,426.00 Rp 10,197,709.60
- Bekisting m2 A.4.1.1.24 8.80 Rp 538,747.00 Rp 4,740,973.60
6 Panggung
- timbunan m3 A.2.3.1.9. 5.13 Rp 31,625.00 Rp 162,236.25
- Pas. Bata m2 A.4.4.1.9 4.68 Rp 115,975.00 Rp 543,226.90
- Beton K 150 m3 A.4.1.1.2 1.63 Rp 1,299,793.00 Rp 2,125,083.57
B PEKERJAAN BETON
1 Sloof 20 x 25 K-250
- Beton K 250 m3 A.4.1.1.8. 1.80 Rp 1,415,696.00 Rp 2,548,252.80
- Besi kg A.4.1.1.17 359.621208 Rp 18,161.00 Rp 6,531,080.76
- Bekisting m2 A.4.1.1.21 9 Rp 245,344.00 Rp 2,208,096.00
2 Kolom Praktis 15 x 15 K-250
- Beton K 250 m3 A.4.1.1.8. 1.184625 Rp 1,415,696.00 Rp 1,677,068.87
- Besi kg A.4.1.1.17 53.0064 Rp 18,161.00 Rp 962,649.23
- Bekisting m2 A.4.1.1.22 3.94875 Rp 428,747.00 Rp 1,693,014.72
3 Ring lintel 15 x 15 K-250
- Beton K 250 m3 A.4.1.1.8. 0.50 Rp 766,811.00 Rp 380,951.70
- Besi kg A.4.1.1.17 139.18 Rp 23,438.00 Rp 3,262,008.53
- Bekisting m2 A.4.1.1.23 4.14 Rp 443,597.00 Rp 1,836,491.58
3 Ring balok 15 x 20 K-250
- Beton K 250 m3 #REF! 0.81 Rp 766,811.00 Rp 621,116.91
- Besi kg #REF! 225.8271 Rp 23,438.00 Rp 5,292,935.57
- Bekisting m2 #REF! 5.4 Rp 443,597.00 Rp 2,395,423.80
4 Plat Lantai
- Urugan Pasir m3 A.2.3.1.11. 8.00 Rp 350,618.00 Rp 2,804,944.00
- Pek. Timbunan Tanah m3 A.2.3.1.9. 24.00 Rp 31,625.00 Rp 759,000.00
5 Rabat beton
- Beton K-100 m3 A.4.1.1.1 8.05 Rp 1,267,426.00 Rp 10,197,709.60
- Bekisting m2 A.4.1.1.24 8.8 Rp 538,747.00 Rp 4,740,973.60
2 Pondasi Footplate
- Pek. Galian tanah m3 A.2.3.1.1. 1.23 Rp 86,625.00 Rp 106,722.00
- Pek. Urugan Pasir 10 cm m3 A.2.3.1.11. 0.11 Rp 350,618.00 Rp 39,269.22
- Beton K-250 m3 A.4.1.1.8. 1.12 Rp 1,415,696.00 Rp 1,585,579.52
- Besi kg A.4.1.1.17 24.75 Rp 18,161.00 Rp 449,521.07
- Bekisting m2 A.4.1.1.20 0.56 Rp 229,944.00 Rp 128,768.64
B PEKERJAAN BETON
1 Sloof 20 x 25 K-250
- Galian Tanah m3 A.2.3.1.1. 7.69 Rp 86,625.00 Rp 665,799.75
- Beton K 250 m3 A.4.1.1.8. 4.27 Rp 1,415,696.00 Rp 6,045,021.92
- Besi kg A.4.1.1.17 109.75 Rp 18,161.00 Rp 1,993,191.54
- Bekisting m2 A.4.1.1.21 21.35 Rp 245,344.00 Rp 5,238,094.40
2 Kolom 25 x 15
- Beton K 250 m3 A.4.1.1.8. 1.31 Rp 1,415,696.00 Rp 1,858,101.00
- Besi kg A.4.1.1.17 22.15 Rp 18,161.00 Rp 402,302.47
- Bekisting m2 A.4.1.1.22 10.50 Rp 428,747.00 Rp 4,501,843.50
3 Pelat lantai
- Urugan Pasir m3 A.2.3.1.11. 23.97 Rp 350,618.00 Rp 8,405,996.43
- Pek. Timbunan Tanah m3 A.3.2.1.3. 157.64 Rp 31,625.00 Rp 4,985,494.66
C PEKERJAAN ATAP
- Pek. Pas. Atap Spandek Lapis Pasir m2 400.75 Rp 109,425.75 Rp 43,852,369.31
- Pek. Pas. Gording C m2 A.4.2.1.22. 400.75 Rp 276,939.00 Rp 110,983,304.25
- Pek. Nok Genteng Metal m' A.4.5.2.37. 115.50 Rp 172,146.00 Rp 19,882,863.00
- Pek. Pas. Talang Jurai seng m' A.4.2.1.18. 111.30 Rp 156,629.00 Rp 17,432,807.70
- Pek. Pipa Galvanis 6" kg 11353.53 Rp 50,201.04 Rp 569,959,013.67
- Pek. Pipa Galvanis 5" kg 1706.46 Rp 50,600.66 Rp 86,348,002.26
NO. JENIS PEKERJAAN SATUAN KODE VOLUME HARGA SATUAN JUMLAH
- Pek. Plat Landas dan Stifenerse ls 15.17 Rp -
Rp 1,048,938,765.73
TOTAL #NAME?
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN GEDUNG MULTI IBADAH
LOKASI : KAMPUS INSTITUT TEKNOLOGI SUMATRA
TAHUN : 2021
PEKERJAAN ARSITEKTUR
HARGA SATUAN
NO. JENIS PEKERJAAN SATUAN KODE VOLUME JUMLAH
Rp 35,421,182.37
D PEKERJAAN PLAFOND
- Pek. Rangka Hollow m2 =AHSP!B2482 0 Rp 200,860.00 Rp -
- Pek. Plafond Gypsum m2 =AHSP!B5044 0 Rp 64,392.00 Rp -
- Pek. Plafond GRC m2 A.4.5.1.10. a 0 Rp 104,227.00 Rp -
- Pek. List Plafond m =AHSP!B5082 0 Rp 17,687.00 Rp -
E PEKERJAAN PENGECATAN
- Pengecatan dinding luar (eksterior) m2 A.4.7.1.10. a 288 Rp 58,505.00 Rp 16,849,440.00
F PEKERJAAN ATAP
- Pek. List plank m A.4.5.1.9.a 0 Rp 84,645.00 Rp -
Rp 301,379,443.22
D PEKERJAAN SANITAIR
- Closet Jongkok unit 2.00 Rp 160,500.00 Rp 321,000.00
- keran Air unit 6.00 Rp 15,000.00 Rp 90,000.00
D PEKERJAAN PLAFOND
- Pek. Rangka Hollow m2 =D52 109.16 Rp 200,860.00 Rp 21,925,877.60
- Pek. Plafond Gypsum m2 =D53 77.32 Rp 64,392.00 Rp 4,978,789.44
- Pek. Plafond GRC m2 =D54 31.84 Rp 104,227.00 Rp 3,318,587.68
- Pek. List Plafond m =D55 7.36 Rp 17,687.00 Rp 130,140.95
E PEKERJAAN PENGECATAN
- Pengecatan dinding luar (eksterior) m2 A.4.7.1.10. a 129.61 Rp 58,505.00 Rp 7,582,833.05
HARGA SATUAN
NO. JENIS PEKERJAAN SATUAN KODE VOLUME JUMLAH
- Pengecatan dinding dalam(Interior) m2 A.4.7.1.10. 312.38 Rp 48,495.00 Rp 15,148,868.10
- Pengecatan Plafond Gypsum m2 A.4.7.1.10. 109.16 Rp 48,495.00 Rp 5,293,714.20
F PEKERJAAN ATAP
- Pek. List plank m A.4.5.1.9.a 43 Rp 84,645.00 Rp 3,639,735.00
Rp 1,112,963,373.22
D PEKERJAAN PLAFOND
- Pek. Rangka Hollow m2 =D89 109.16 Rp 200,860.00 Rp 21,925,877.60
- Pek. Plafond Gypsum m2 77.32 Rp 64,392.00 Rp 4,978,789.44
- Pek. Plafond GRC m2 31.84 Rp 104,227.00 Rp 3,318,587.68
- Pek. List Plafond m =D90 81.72 Rp 17,687.00 Rp 1,445,381.64
E PEKERJAAN PENGECATAN
- Pengecatan dinding luar (eksterior) m2 A.4.7.1.10. a 106.24 Rp 58,505.00 Rp 6,215,454.19
- Pengecatan dinding dalam(Interior) m2 A.4.7.1.10. 145.12 Rp 48,495.00 Rp 7,037,497.41
- Pengecatan Plafond Gypsum m2 A.4.7.1.10. 109.16 Rp 48,495.00 Rp 5,293,714.20
F PEKERJAAN ATAP
- Pek. List plank m A.4.5.1.9.a 43.00 Rp 84,645.00 Rp 3,639,735.00
Rp 136,609,414.37
D PEKERJAAN PLAFOND
- Pek. Rangka Hollow m2 =D118 109.16 Rp 200,860.00 Rp 21,925,877.60
- Pek. Plafond Gypsum m2 =D119 77.32 Rp 64,392.00 Rp 4,978,789.44
- Pek. Plafond GRC m2 31.84 Rp 104,227.00 Rp 3,318,587.68
- Pek. List Plafond m 81.72 Rp 17,687.00 Rp 1,445,381.64
E PEKERJAAN PENGECATAN
- Pengecatan dinding luar (eksterior) m2 A.4.7.1.10. a 106.24 Rp 58,505.00 Rp 6,215,454.19
- Pengecatan dinding dalam(Interior) m2 A.4.7.1.10. 145.12 Rp 48,495.00 Rp 7,037,497.41
- Pengecatan Plafond Gypsum m2 A.4.7.1.10. 109.16 Rp 48,495.00 Rp 5,293,714.20
F PEKERJAAN ATAP
- Pek. List plank m A.4.5.1.9.a 43.00 Rp 84,645.00 Rp 3,639,735.00
Rp 136,609,414.37
D PEKERJAAN PLAFOND
- Pek. Rangka Hollow m2 =D147 109.16 Rp 200,860.00 Rp 21,925,877.60
- Pek. Plafond Gypsum m2 =D148 77.32 Rp 64,392.00 Rp 4,978,789.44
- Pek. Plafond GRC m2 31.84 Rp 104,227.00 Rp 3,318,587.68
- Pek. List Plafond m 35.40 Rp 17,687.00 Rp 626,119.80
E PEKERJAAN PENGECATAN
- Pengecatan dinding luar (eksterior) m2 A.4.7.1.10. a 95.84 Rp 58,505.00 Rp 5,607,119.20
- Pengecatan dinding dalam(Interior) m2 A.4.7.1.10. 95.84 Rp 48,495.00 Rp 4,647,760.80
- Pengecatan Plafond Gypsum m2 A.4.7.1.10. 109.16 Rp 48,495.00 Rp 5,293,714.20
F PEKERJAAN ATAP
- Pek. List plank m A.4.5.1.9.a 43.00 Rp 84,645.00 Rp 3,639,735.00
Rp 137,804,939.76
VII AULA
A PEKERJAAN PASANGAN
- Plesteran Struktur adk. 1:4 m2 A.4.4.2.4. 21.00 Rp 72,564.00 Rp 1,523,844.00
- Acian m2 A.4.4.2.27. 21.00 Rp 42,680.00 Rp 896,280.00
- Pas. Paving Block m2 =AHSP!B4821 167.25 Rp 172,004.00 Rp 28,767,841.00
- Pas. Kantin m2 =AHSP!B4915 168.00 Rp 132,047.00 Rp 22,183,896.00
E PEKERJAAN PENGECATAN
- Pengecatan Pipa Galvanis m2 =AHSP!B7159 394.27 Rp 80,571.00 Rp 31,766,728.17
- Pengecatan Struktur (eksterior) m2 A.4.7.1.10. a 76.86 Rp 58,505.00 Rp 4,496,694.30
Rp 210,132,579.34
TOTAL
- Rp 2,070,920,346.65
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN GEDUNG MULTI IBADAH
LOKASI : KAMPUS INSTITUT TEKNOLOGI SUMATRA
TAHUN : 2021
I PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI
1 Pondasi Menerus
- Pek. Galian tanah m3 A.2.3.1.1. 67.44 124.80 Rp 86,625.00 Rp 10,810,800.00
- Pek. Timbunan Tanah m3 A.2.3.1.9. 22.48 42.00 Rp 31,625.00 Rp 1,328,250.00
- Pek. Urugan Pasir 10 cm m3 A.2.3.1.11. 9.60 Rp 350,618.00 Rp 3,365,932.80
- Pas Batu Belah 1:5 m3 A.3.2.1.3. 59.71 42.00 Rp 989,876.00 Rp 41,574,792.00
- Pas. Aanstamping m3 A.3.2.1.9. 14.40 Rp 633,069.00 Rp 9,116,193.60
Rp 66,195,968.40
B PEKERJAAN BETON
1 Sloof 20 x 25 K-225
- Beton K 250 m3 A.4.1.1.7. 3.65 3.60 Rp 1,403,726.00 Rp 5,053,413.60
- Besi kg A.4.1.1.17 846.48 Rp 18,161.00 Rp 15,372,967.76
- Bekisting m2 A.4.1.1.21 24.00 Rp 245,344.00 Rp 5,888,256.00
2 Kolom Praktis 15 x 15 K-225
- Beton K 250 m3 A.4.1.1.7. m1 211.5 2.70 Rp 1,403,726.00 Rp 3,791,070.88
- Besi kg A.4.1.1.17 417.16 Rp 18,161.00 Rp 7,575,959.22
- Bekisting m2 A.4.1.1.22 14.58 Rp 428,747.00 Rp 6,251,131.26
4 Ring balok 15 x 20 K-225
- Beton K 250 m3 A.4.1.1.7. 2.16 Rp 1,403,726.00 Rp 3,032,048.16
- Besi kg A.4.1.1.17 3.65 574.79 Rp 18,161.00 Rp 10,438,733.65
- Bekisting m2 A.4.1.1.23 18.00 Rp 443,597.00 Rp 7,984,746.00
5 Plat Lantai
- Urugan Pasir m3 A.2.3.1.11. 5.62 26.40 Rp 350,618.00 Rp 9,256,315.20
- Pek. Timbunan Tanah m3 A.2.3.1.9. 0.00 Rp 31,625.00 Rp -
Rp 74,644,641.73
II PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN
- Pas. Dinding Bata Ringan adk. 1:4 m2 A.4.4.1.10 452.01 407.36 Rp 114,134.00 Rp 46,493,444.77
- Plesteran adk. 1:4 m2 A.4.4.2.4. 801.67 862.24 Rp 72,564.00 Rp 62,567,352.61
- Acian m2 A.4.4.2.27. 801.67 862.24 Rp 42,680.00 Rp 36,800,267.48
Rp 145,861,064.85
D PEKERJAAN PLAFOND
- Pek. Rangka Hollow m2 A.4.2.1.21. 0.00 Rp 200,860.00 Rp -
- Pek. Plafond Gypsum m2 A.4.5.1.7. 0.00 Rp 64,392.00 Rp -
- Pek. Plafond GRC m2 A.4.5.1.10. a 0.00 Rp 104,227.00 Rp -
- Pek. List Plafond m A.4.5.1.9. 0.00 Rp 17,687.00 Rp -
Rp -
E PEKERJAAN PENGECATAN
- Pengecatan dinding luar (eksterior) m2 A.4.7.1.10. a 288.00 Rp 58,505.00 Rp 16,849,440.00
- Pengecatan dinding dalam (Interior) m2 A.4.7.1.10. 574.24 Rp 48,495.00 Rp 27,847,614.59
- Pengecatan Plafond Gypsum m2 A.4.7.1.10. 0.00 Rp 48,495.00 Rp -
Rp 44,697,054.59
F PEKERJAAN ATAP
NO. JENIS PEKERJAAN SATUAN KODE VOLUME HARGA SATUAN JUMLAH
Rp -
TOTAL Rp 347,615,705.66
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.4000 100,000 40,000.00
Tukang Kayu L.02.04 OH 0.2000 120,000 24,000.00
Kepala Tukang L.03.01 OH 0.0200 140,000 2,800.00
Mandor L.04.01 OH 0.0200 150,000 3,000.00
JUMLAH TENAGA KERJA 69,800.00
B BAHAN -
Dolken kayu Ø 8-10/400 cm Batang 1.2500 25,000 31,250.00
semen Kg 5.0000 1,200 6,000.00
Pasir beton m3 0.0050 257,600 1,288.00 #VALUE!
Koral beton m3 0.0090 235,990 2,123.91
Kayu balok 5/7 kelas III m3 0.0720 2,499,000 179,928.00
Paku 5 - 10 cm Kg 0.0600 16,000 960.00
Residu Liter 0.4000 8,330 3,332.00
JUMLAH HARGA BAHAN 224,881.91
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 294,681.91
E Overhead & Profit 10% 10% 29,468.19
F Harga Satuan Pekerjaan (D+E) - 324,150.00
A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari Seng Gelombang 3" x 6" BJLS 28 tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.2000 100,000 20,000.00
Tukang Kayu L.02.04 OH 0.4000 120,000 48,000.00
Kepala Tukang L.03.01 OH 0.0200 140,000 2,800.00
Mandor L.04.01 OH 0.0200 150,000 3,000.00
JUMLAH TENAGA KERJA 73,800.00
B BAHAN -
Dolken kayu Ø 8-10/400 cm Batang 1.2500 25,000 31,250.00
semen Kg 2.5000 1,200 3,000.00
Seng Gelombang 3" x 6" BJLS 28 Lbr 1.2000 56,500 67,800.00
Pasir beton m3 0.0050 257,600 1,288.00
Koral beton m3 0.0090 235,990 2,123.91
Kayu balok 5/7 kelas III m3 0.0720 2,499,000 179,928.00
Paku 5 - 10 cm Kg 0.0600 16,000 960.00
Meni besi Liter 0.4500 31,800 14,310.00
JUMLAH HARGA BAHAN 300,659.91
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 374,459.91
E Overhead & Profit 10% 10% 37,445.99
F Harga Satuan Pekerjaan (D+E) - 411,905.00
A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.2000 100,000 20,000.00
Tukang Kayu L.02.04 OH 0.3000 120,000 36,000.00
Kepala Tukang L.03.01 OH 0.0200 120,000 2,400.00
Mandor L.04.01 OH 0.0200 150,000 3,000.00
JUMLAH TENAGA KERJA 61,400.00
B BAHAN - -
Dolken kayu Ø 8-10/400 cm Batang 1.0000 25,000 25,000.00
semen Kg 2.0000 1,200 2,400.00
Kawat duri M’ 25.0000 22,000 550,000.00
Pasir beton m3 0.0050 257,600 1,288.00
Koral beton m3 0.0090 235,990 2,123.91
Paku Biasa 2" - 5" Kg 0.0600 26,750 1,605.00
JUMLAH HARGA BAHAN 643,816.91
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 674,516.91
E Overhead & Profit 10% 10% 67,451.69
F Harga Satuan Pekerjaan (D+E) - 741,968.00
A.3.2.1.10. (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4000 100,000 340,000.00
Tukang Batu L.02.03 OH 0.8500 120,000 102,000.00
Kepala Tukang L.03.01 OH 0.0850 140,000 11,900.00
Mandor L.04.01 OH 0.1700 150,000 25,500.00
JUMLAH TENAGA KERJA 479,400.00
B BAHAN
Batu belah m3 0.4800 280,000 134,400.00
semen Kg 194.0000 1,200 232,800.00
Pasir Beton m3 0.3120 257,600 80,371.20
Kerikil m3 0.4680 350,000 163,800.00
Besi beton Kg 126.0000 13,750 1,732,500.00
Kawat beton Kg 1.8000 25,000 45,000.00
JUMLAH HARGA BAHAN 2,388,871.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,868,271.20
E Overhead & Profit 10% 10% 286,827.12
F Harga Satuan Pekerjaan (D+E) - 3,155,098.00
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 100,000 120,000.00
Tukang Batu L.02.03 OH 0.2000 120,000 24,000.00
Kepala Tukang L.03.01 OH 0.0200 140,000 2,800.00
Mandor L.04.01 OH 0.0600 150,000 9,000.00
JUMLAH TENAGA KERJA 155,800.00
B BAHAN
semen kg 230.0000 1,200 276,000.00
Pasir Beton (kg) kg 893.0000 257 229,501.00
Kerikil (kg) kg 1027.0000 397 407,719.00
Air Liter 200.0000 100 20,000.00
JUMLAH HARGA BAHAN 933,220.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,089,020.00
E Overhead & Profit 10% 10% 108,902.00
F Harga Satuan Pekerjaan (D+E) - 1,197,922.00
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 100,000 165,000.00
Tukang Batu L.02.03 OH 0.2750 120,000 33,000.00
Kepala Tukang L.03.01 OH 0.0280 140,000 3,920.00
Mandor L.04.01 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 214,370.00
B BAHAN
semen kg 326.0000 1,200 391,200.00
Pasir Beton (kg) kg 760.0000 257 195,320.00
Kerikil (kg) kg 1029.0000 397 408,513.00
Air Liter 215.0000 100 21,500.00
JUMLAH HARGA BAHAN 1,016,533.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,230,903.00
E Overhead & Profit 10% 10% 123,090.30
F Harga Satuan Pekerjaan (D+E) - 1,353,993.00
A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 100,000 165,000.00
Tukang Batu L.02.03 OH 0.2750 120,000 33,000.00
Kepala Tukang L.03.01 OH 0.0280 140,000 3,920.00
Mandor L.04.01 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 214,370.00
B BAHAN
semen kg 352.0000 1,200 422,400.00
Pasir Beton (kg) kg 731.0000 257 187,867.00
Kerikil (kg) kg 1031.0000 397 409,307.00
Air Liter 215.0000 100 21,500.00
JUMLAH HARGA BAHAN 1,041,074.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,255,444.00
E Overhead & Profit 10% 10% 125,544.40
F Harga Satuan Pekerjaan (D+E) - 1,380,988.00
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 100,000 165,000.00
Tukang Batu L.02.03 OH 0.2750 120,000 33,000.00
Kepala Tukang L.03.01 OH 0.0280 140,000 3,920.00
Mandor L.04.01 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 214,370.00
B BAHAN
semen kg 371.0000 1,200 445,200.00
Pasir Beton (kg) kg 698.0000 257 179,386.00
Kerikil (kg) kg 1047.0000 397 415,659.00
Air Liter 215.0000 100 21,500.00
JUMLAH HARGA BAHAN 1,061,745.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,276,115.00
E Overhead & Profit 10% 10% 127,611.50
F Harga Satuan Pekerjaan (D+E) - 1,403,726.00
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 100,000 165,000.00
Tukang Batu L.02.03 OH 0.2750 120,000 33,000.00
Kepala Tukang L.03.01 OH 0.0280 140,000 3,920.00
Mandor L.04.01 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 214,370.00
B BAHAN
semen kg 384.0000 1,200 460,800.00
Pasir Beton (kg) kg 692.0000 257 177,844.00
Kerikil (kg) kg 1039.0000 397 412,483.00
Air Liter 215.0000 100 21,500.00
JUMLAH HARGA BAHAN 1,072,627.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,286,997.00
E Overhead & Profit 10% 10% 128,699.70
F Harga Satuan Pekerjaan (D+E) - 1,415,696.00
A.4.1.1.9. Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 100,000 165,000.00
Tukang Batu L.02.03 OH 0.2750 120,000 33,000.00
Kepala Tukang L.03.01 OH 0.0280 140,000 3,920.00
Mandor L.04.01 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 214,370.00
B BAHAN
semen kg 406.0000 1,200 487,200.00
Pasir Beton (kg) kg 684.0000 257 175,788.00
Kerikil (kg) kg 1026.0000 397 407,322.00
Air Liter 215.0000 100 21,500.00
JUMLAH HARGA BAHAN 1,091,810.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,306,180.00
E Overhead & Profit 10% 10% 130,618.00
F Harga Satuan Pekerjaan (D+E) - 1,436,798.00
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 100,000 165,000.00
Tukang Batu L.02.03 OH 0.2750 120,000 33,000.00
Kepala Tukang L.03.01 OH 0.0280 140,000 3,920.00
Mandor L.04.01 OH 0.0830 150,000 12,450.00
JUMLAH TENAGA KERJA 214,370.00
B BAHAN
semen kg 413.0000 1,200 495,600.00
Pasir Beton (kg) kg 681.0000 257 175,017.00
Kerikil (kg) kg 1021.0000 397 405,337.00
Air Liter 215.0000 100 21,500.00
JUMLAH HARGA BAHAN 1,097,454.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,311,824.00
E Overhead & Profit 10% 10% 131,182.40
F Harga Satuan Pekerjaan (D+E) - 1,443,006.00
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 100,000 210,000.00
Tukang Batu L.02.03 OH 0.3500 120,000 42,000.00
Kepala Tukang L.03.01 OH 0.0350 140,000 4,900.00
Mandor L.04.01 OH 0.1050 150,000 15,750.00
JUMLAH TENAGA KERJA 272,650.00
B BAHAN
semen kg 439.0000 1,200 526,800.00
Pasir Beton kg 670.0000 257,600 172,592,000.00
Kerikil (kg) kg 1006.0000 397 399,382.00
Air Liter 215.0000 100 21,500.00
JUMLAH HARGA BAHAN 173,539,682.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 173,812,332.00
E Overhead & Profit 10% 10% 17,381,233.20
F Harga Satuan Pekerjaan (D+E) - 191,193,565.00
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 100,000 210,000.00
Tukang Batu L.02.03 OH 0.3500 120,000 42,000.00
Kepala Tukang L.03.01 OH 0.0350 140,000 4,900.00
Mandor L.04.01 OH 0.1050 150,000 15,750.00
JUMLAH TENAGA KERJA 272,650.00
B BAHAN
semen kg 448.0000 1,200 537,600.00
Pasir Beton (kg) kg 667.0000 257 171,419.00
Kerikil (kg) kg 1000.0000 397 397,000.00
Air Liter 215.0000 100 21,500.00
JUMLAH HARGA BAHAN 1,127,519.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,400,169.00
E Overhead & Profit 10% 10% 140,016.90
F Harga Satuan Pekerjaan (D+E) - 1,540,185.00
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan sesuai Tabel berikut:
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%
A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1320 100,000 13,200.00
Tukang batu L.02.03 OH 0.0220 120,000 2,640.00
Kepala tukang L.03.01 OH 0.0020 140,000 280.00
Mandor L.04.01 OH 0.0070 150,000 1,050.00
JUMLAH TENAGA KERJA 17,170.00
B BAHAN
semen Kg 26.0800 1,200 31,296.00
Pasir beton Kg 60.8000 257,600 15,662,080.00
Kerikil (kg) Kg 82.3200 397 32,681.04
Air L 17.2000 100 1,720.00
JUMLAH HARGA BAHAN 15,727,777.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 15,744,947.04
E Overhead & Profit 10% 10% 1,574,494.70
F Harga Satuan Pekerjaan (D+E) - 17,319,441.00
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1650 100,000 16,500.00
Tukang batu L.02.03 OH 0.0280 120,000 3,360.00
Kepala tukang L.03.01 OH 0.0030 140,000 420.00
Mandor L.04.01 OH 0.0080 150,000 1,200.00
JUMLAH TENAGA KERJA 21,480.00
B BAHAN
semen Kg 32.6000 1,200 39,120.00
Pasir beton Kg 76.0000 257,600 19,577,600.00
Kerikil (kg) Kg 102.9000 397 40,851.30
Air L 21.5000 100 2,150.00
JUMLAH HARGA BAHAN 19,659,721.30
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 19,681,201.30
E Overhead & Profit 10% 10% 1,968,120.13
F Harga Satuan Pekerjaan (D+E) - 21,649,321.00
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1980 100,000 19,800.00
Tukang batu L.02.03 OH 0.0330 120,000 3,960.00
Kepala tukang L.03.01 OH 0.0030 140,000 420.00
Mandor L.04.01 OH 0.0100 150,000 1,500.00
JUMLAH TENAGA KERJA 25,680.00
B BAHAN
semen Kg 32.1200 1,200 38,544.00
Pasir beton Kg 91.2000 257,600 23,493,120.00
Kerikil (kg) Kg 123.4800 397 49,021.56
Air L 25.8000 100 2,580.00
JUMLAH HARGA BAHAN 23,583,265.56
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 23,608,945.56
E Overhead & Profit 10% 10% 2,360,894.56
F Harga Satuan Pekerjaan (D+E) - 25,969,840.00
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2480 100,000 24,800.00
Tukang batu L.02.03 OH 0.0410 120,000 4,920.00
Kepala tukang L.03.01 OH 0.0040 140,000 560.00
Mandor L.04.01 OH 0.0130 150,000 1,950.00
JUMLAH TENAGA KERJA 32,230.00
B BAHAN
semen Kg 48.9000 1,200 58,680.00
Pasir beton Kg 114.0000 257,600 29,366,400.00
Kerikil (kg) Kg 154.3500 397 61,276.95
Air L 32.2500 100 3,225.00
JUMLAH HARGA BAHAN 29,489,581.95
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 29,521,811.95
E Overhead & Profit 10% 10% 2,952,181.20
F Harga Satuan Pekerjaan (D+E) - 32,473,993.00
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 100,000 400.00
Tukang batu L.02.03 OH 0.0380 120,000 4,560.00
Kepala tukang L.03.01 OH 0.0040 140,000 560.00
Mandor L.04.01 OH 0.0010 150,000 150.00
JUMLAH TENAGA KERJA 5,670.00
B BAHAN
Kaso 5/7 Kelas II m3 0.0050 3,605,000 18,025.00
Phenol film 12mm Lbr 0.0430 142,100 6,110.30
Minyak bekisting L 0.2000 15,000 3,000.00
Dynabol dia 12 x 120 mm Bh 0.6930 6,300 4,365.90
JUMLAH HARGA BAHAN 31,501.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 37,171.20
E Overhead & Profit 10% 10% 3,717.12
F Harga Satuan Pekerjaan (D+E) - 40,888.00
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 100,000 400.00
Tukang batu L.02.03 OH 0.0380 120,000 4,560.00
Kepala tukang L.03.01 OH 0.0040 140,000 560.00
Mandor L.04.01 OH 0.0010 150,000 150.00
JUMLAH TENAGA KERJA 5,670.00
B BAHAN
Kaso 5/7 Kelas II m3 0.0040 3,605,000 14,420.00
Phenol film 12mm Lbr 0.0480 142,100 6,820.80
Minyak bekisting L 0.2000 15,000 3,000.00
Paku 5 - 10 cm Kg 0.0460 16,000 736.00
Dynabol dia 12 x 120 mm Bh 0.6930 6,300 4,365.90
JUMLAH HARGA BAHAN 29,342.70
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 35,012.70
E Overhead & Profit 10% 10% 3,501.27
F Harga Satuan Pekerjaan (D+E) - 38,513.00
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0530 100,000 5,300.00
Tukang kayu L.02.04 OH 0.0180 120,000 2,160.00
Mandor L.04.01 OH 0.0050 150,000 750.00
JUMLAH TENAGA KERJA 8,210.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 8,210.00
E Overhead & Profit 10% 10% 821.00
F Harga Satuan Pekerjaan (D+E) - 9,031.00
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0890 100,000 8,900.00
Tukang kayu L.02.04 OH 0.0300 120,000 3,600.00
Mandor L.04.01 OH 0.0050 150,000 750.00
JUMLAH TENAGA KERJA 13,250.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 13,250.00
E Overhead & Profit 10% 10% 1,325.00
F Harga Satuan Pekerjaan (D+E) - 14,575.00
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0710 100,000 7,100.00
Tukang kayu L.02.04 OH 0.0240 120,000 2,880.00
Mandor L.04.01 OH 0.0050 150,000 750.00
JUMLAH TENAGA KERJA 10,730.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 10,730.00
E Overhead & Profit 10% 10% 1,073.00
F Harga Satuan Pekerjaan (D+E) - 11,803.00
A.4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0640 100,000 6,400.00
Tukang batu L.02.03 OH 0.2440 120,000 29,280.00
Tukang vibrator L.02.14 OH 0.1280 120,000 15,360.00
Kepala Tukang L.03.01 OH 0.0340 140,000 4,760.00
Mandor L.04.01 OH 0.0730 150,000 10,950.00
JUMLAH TENAGA KERJA 66,750.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 66,750.00
E Overhead & Profit 10% 10% 6,675.00
F Harga Satuan Pekerjaan (D+E) - 73,425.00
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0500 100,000 105,000.00
Tukang Las L.02.11 OH 1.0500 120,000 126,000.00
Kepala tukang L.03.01 OH 0.1050 140,000 14,700.00
Mandor L.04.01 OH 0.0520 150,000 7,800.00
JUMLAH TENAGA KERJA 253,500.00
B BAHAN
Besi siku L 30.30.3 Kg 15.0000 14,340 215,100.00
Besi plat baja Kg 32.8000 10,200 334,560.00
Kawat las listrik Kg 0.0500 55,350 2,767.50
JUMLAH HARGA BAHAN 552,427.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 805,927.50
E Overhead & Profit 10% 10% 80,592.75
F Harga Satuan Pekerjaan (D+E) - 886,520.00
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 100,000 15,000.00
Tukang L.02.01 OH 0.3000 120,000 36,000.00
Kepala tukang L.03.01 OH 0.0300 140,000 4,200.00
Mandor L.04.01 OH 0.0080 150,000 1,200.00
JUMLAH TENAGA KERJA 56,400.00
B BAHAN
Seng plat m 1.0500 40,000 42,000.00
Paku 5 - 10 cm kg 0.0100 16,000 160.00
Besi strip kg 0.5000 - -
JUMLAH HARGA BAHAN 42,160.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 98,560.00
E Overhead & Profit 10% 10% 9,856.00
F Harga Satuan Pekerjaan (D+E) - 108,416.00
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 100,000 25,000.00
Tukang Besi L.02.05 OH 0.2500 120,000 30,000.00
Kepala Tukang L.03.01 OH 0.0250 140,000 3,500.00
Mandor L.04.01 OH 0.0130 150,000 1,950.00
JUMLAH TENAGA KERJA 60,450.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.5000 - -
Assesoris (perkuatan, las dll) Ls 1.0000 150,100 150,100.00
JUMLAH HARGA BAHAN 150,100.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 210,550.00
E Overhead & Profit 10% 10% 21,055.00
F Harga Satuan Pekerjaan (D+E) - 231,605.00
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7604 100,000 76,040.00
Tukang Besi L.02.05 OH 0.7604 120,000 91,248.00
Kepala Tukang L.03.01 OH 0.0760 140,000 10,640.00
Mandor L.04.01 OH 0.0380 150,000 5,700.00
JUMLAH TENAGA KERJA 183,628.00
B BAHAN
Baja ringan canai dingin C75 kg 4.0500 15,294 61,941.18
JUMLAH HARGA BAHAN 61,941.18
C PERALATAN - -
Alat Rangka Atap Baja Canai Dingin 0.1000 486,000 6,194.12
JUMLAH HARGA ALAT 6,194.12
D Jumlah (A+B+C) - 251,763.29
E Overhead & Profit 10% 10% 25,176.33
F Harga Satuan Pekerjaan (D+E) - 276,939.00
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7340 100,000 73,400.00
Tukang Besi L.02.05 OH 0.7340 120,000 88,080.00
Kepala Tukang L.03.01 OH 0.0730 140,000 10,220.00
Mandor L.04.01 OH 0.0370 150,000 5,550.00
JUMLAH TENAGA KERJA 177,250.00
B BAHAN
Baja ringan canai dingin C75 kg 4.0500 - 15,294.12
JUMLAH HARGA BAHAN 15,294.12
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 486,000 1,529.41
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 193,308.82
E Overhead & Profit 10% 10% 19,330.88
F Harga Satuan Pekerjaan (D+E) - 212,639.00
A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 100,000 20,000.00
Tukang Besi L.02.05 OH 0.4500 120,000 54,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0500 150,000 7,500.00
JUMLAH TENAGA KERJA 82,900.00
B BAHAN
Baja ringan canai dingin C75 M' 3.7200 12,667 47,120.00
Baut (Srew driver) bh 28.0000 490 13,720.00
Dynabol dia 12 x 120 mm bh 2.0000 6,300 12,600.00
Reng Canai Dingin M' 5.4000 8,000 43,200.00
Talang / Jurai Canai Dingin M' 0.1240 54,450 6,751.80
JUMLAH HARGA BAHAN 123,391.80
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 486,000 12,339.18
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 212,461.39
E Overhead & Profit 10% 10% 21,246.14
F Harga Satuan Pekerjaan (D+E) - 233,707.00
A.4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 100,000 60,000.00
Tukang Batu L.02.03 OH 0.2000 120,000 24,000.00
Kepala Tukang L.03.01 OH 0.0200 140,000 2,800.00
Mandor L.04.01 OH 0.0300 150,000 4,500.00
JUMLAH TENAGA KERJA 91,300.00
B BAHAN
Bata merah m3 140.0000 500 70,000.00
semen Kg 32.9500 1,200 39,540.00
Pasir Pasang m3 0.0910 255,400 23,241.40
JUMLAH HARGA BAHAN 132,781.40
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 224,081.40
E Overhead & Profit 10% 10% 22,408.14
F Harga Satuan Pekerjaan (D+E) - 246,489.00
A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 100,000 60,000.00
Tukang Batu L.02.03 OH 0.2000 120,000 24,000.00
Kepala Tukang L.03.01 OH 0.0200 140,000 2,800.00
Mandor L.04.01 OH 0.0300 150,000 4,500.00
JUMLAH TENAGA KERJA 91,300.00
B BAHAN
Bata merah m3 140.0000 500 70,000.00
semen Kg 26.5500 1,200 31,860.00
Pasir Pasang m3 0.0930 255,400 23,752.20
JUMLAH HARGA BAHAN 125,612.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 216,912.20
E Overhead & Profit 10% 10% 21,691.22
F Harga Satuan Pekerjaan (D+E) - 238,603.00
A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 100,000 60,000.00
Tukang Batu L.02.03 OH 0.2000 120,000 24,000.00
Kepala Tukang L.03.01 OH 0.0200 140,000 2,800.00
Mandor L.04.01 OH 0.0300 150,000 4,500.00
JUMLAH TENAGA KERJA 91,300.00
B BAHAN
Bata merah m3 140.0000 500 70,000.00
semen Kg 22.2000 1,200 26,640.00
Pasir Pasang m3 0.1020 255,400 26,050.80
JUMLAH HARGA BAHAN 122,690.80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 213,990.80
E Overhead & Profit 10% 10% 21,399.08
F Harga Satuan Pekerjaan (D+E) - 235,389.00
A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 100,000 60,000.00
Tukang Batu L.02.03 OH 0.2000 120,000 24,000.00
Kepala Tukang L.03.01 OH 0.0200 140,000 2,800.00
Mandor L.04.01 OH 0.0300 150,000 4,500.00
JUMLAH TENAGA KERJA 91,300.00
B BAHAN
Bata merah m3 140.0000 500 70,000.00
semen Kg 18.5000 1,200 22,200.00
Pasir Pasang m3 0.1220 255,400 31,158.80
JUMLAH HARGA BAHAN 123,358.80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 214,658.80
E Overhead & Profit 10% 10% 21,465.88
F Harga Satuan Pekerjaan (D+E) - 236,124.00
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 100,000 60,000.00
Tukang Batu L.02.03 OH 0.2000 120,000 24,000.00
Kepala Tukang L.03.01 OH 0.0200 140,000 2,800.00
Mandor L.04.01 OH 0.0300 150,000 4,500.00
JUMLAH TENAGA KERJA 91,300.00
B BAHAN
Bata merah m3 140.0000 500 70,000.00
semen Kg 10.0800 1,200 12,096.00
Kapur m3 0.0275 200,000 5,500.00
Pasir Pasang m3 0.0925 255,400 23,624.50
JUMLAH HARGA BAHAN 111,220.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 202,520.50
E Overhead & Profit 10% 10% 20,252.05
F Harga Satuan Pekerjaan (D+E) - 222,772.00
A.4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1000 120,000 12,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
Bata merah m3 70.0000 500 35,000.00
semen Kg 18.9500 1,200 22,740.00
Pasir Pasang m3 0.0380 255,400 9,705.20
JUMLAH HARGA BAHAN 67,445.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 113,095.20
E Overhead & Profit 10% 10% 11,309.52
F Harga Satuan Pekerjaan (D+E) - 124,404.00
A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1000 120,000 12,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
Bata merah m3 70.0000 500 35,000.00
semen Kg 14.3700 1,200 17,244.00
Pasir Pasang m3 0.0400 255,400 10,216.00
JUMLAH HARGA BAHAN 62,460.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 108,110.00
E Overhead & Profit 10% 10% 10,811.00
F Harga Satuan Pekerjaan (D+E) - 118,921.00
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1000 120,000 12,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
Bata merah m3 70.0000 500 35,000.00
semen Kg 11.5000 1,200 13,800.00
Pasir Pasang m3 0.0430 255,400 10,982.20
JUMLAH HARGA BAHAN 59,782.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 105,432.20
E Overhead & Profit 10% 10% 10,543.22
F Harga Satuan Pekerjaan (D+E) - 115,975.00
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1000 120,000 12,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
Bata merah m3 70.0000 500 35,000.00
semen Kg 9.6800 1,200 11,616.00
Pasir Pasang m3 0.0450 255,400 11,493.00
JUMLAH HARGA BAHAN 58,109.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 103,759.00
E Overhead & Profit 10% 10% 10,375.90
F Harga Satuan Pekerjaan (D+E) - 114,134.00
A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1000 120,000 12,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
Bata merah m3 70.0000 500 35,000.00
semen Kg 8.3200 1,200 9,984.00
Pasir Pasang m3 0.0490 255,400 12,514.60
JUMLAH HARGA BAHAN 57,498.60
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 103,148.60
E Overhead & Profit 10% 10% 10,314.86
F Harga Satuan Pekerjaan (D+E) - 113,463.00
A.4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1000 120,000 12,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
Bata merah m3 70.0000 500 35,000.00
semen Kg 6.5000 1,200 7,800.00
Pasir Pasang m3 0.0500 255,400 12,770.00
JUMLAH HARGA BAHAN 55,570.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 101,220.00
E Overhead & Profit 10% 10% 10,122.00
F Harga Satuan Pekerjaan (D+E) - 111,342.00
A.4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1000 120,000 12,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
Bata merah m3 70.0000 500 35,000.00
semen Kg 4.5000 1,200 5,400.00
Kapur m3 0.0150 200,000 3,000.00
Pasir Pasang m3 0.0500 255,400 12,770.00
JUMLAH HARGA BAHAN 56,170.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 101,820.00
E Overhead & Profit 10% 10% 10,182.00
F Harga Satuan Pekerjaan (D+E) - 112,002.00
A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1000 120,000 12,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
Bata merah m3 70.0000 500 35,000.00
Semen Merah Kg 0.0180 - -
Kapur m3 0.0180 200,000 3,600.00
Pasir Pasang m3 0.0180 255,400 4,597.20
JUMLAH HARGA BAHAN - 43,197.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 88,847.20
E Overhead & Profit 10% 10% 8,884.72
F Harga Satuan Pekerjaan (D+E) - 97,731.00
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1000 120,000 12,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
Bata merah m3 70.0000 500 35,000.00
Semen Merah Kg 0.0140 - -
Kapur m3 0.0140 200,000 2,800.00
Pasir Pasang m3 0.0280 255,400 7,151.20
JUMLAH HARGA BAHAN 44,951.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 90,601.20
E Overhead & Profit 10% 10% 9,060.12
F Harga Satuan Pekerjaan (D+E) - 99,661.00
A.4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1000 120,000 12,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
Bata rooster m3 30.0000 840 25,200.00
semen Kg 11.0000 1,200 13,200.00
Pasir Pasang m3 0.0350 255,400 8,939.00
JUMLAH HARGA BAHAN 47,339.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 92,989.00
E Overhead & Profit 10% 10% 9,298.90
F Harga Satuan Pekerjaan (D+E) - 102,287.00
A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1000 120,000 12,000.00
Kepala Tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
Bata berongga m3 30.0000 1,640 49,200.00
semen Kg 11.0000 1,200 13,200.00
Pasir Pasang m3 0.0350 255,400 8,939.00
JUMLAH HARGA BAHAN 71,339.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 116,989.00
E Overhead & Profit 10% 10% 11,698.90
F Harga Satuan Pekerjaan (D+E) - 128,687.00
A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B.
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.350 100,000 35,000.00
Tukang Batu L.02.03 OH 0.130 120,000 15,600.00
Kepala Tukang L.03.01 OH 0.013 140,000 1,820.00
Mandor L.04.01 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 52,870.00
B BAHAN
Bata ringan tebal 7,5 cm m3 0.075 3,405,930 255,444.75
Mortar siap pakai Kg 2.772 11,550 32,016.60
JUMLAH HARGA BAHAN 287,461.35
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 274,400 27,440.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 354,051.35
E Overhead & Profit 10% 10% 35,405.14
F Harga Satuan Pekerjaan (D+E) - 389,456.00
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.350 100,000 35,000.00
Tukang Batu L.02.03 OH 0.130 120,000 15,600.00
Kepala Tukang L.03.01 OH 0.013 140,000 1,820.00
Mandor L.04.01 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 52,870.00
B BAHAN
Bata ringan tebal 7,5 cm m3 0.1 3,405,930 340,593.00
Mortar siap pakai Kg 4.4 11,550 50,820.00
JUMLAH HARGA BAHAN 391,413.00
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 274,400 27,440.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 458,003.00
E Overhead & Profit 10% 10% 45,800.30
F Harga Satuan Pekerjaan (D+E) - 503,803.00
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 100,000 30,000.00
Tukang Batu L.02.03 OH 0.1500 120,000 18,000.00
Kepala Tukang L.03.01 OH 0.0150 140,000 2,100.00
Mandor L.04.01 OH 0.0150 150,000 2,250.00
JUMLAH TENAGA KERJA 52,350.00
B BAHAN
semen Kg 6.3400 1,200 7,608.00
Pasir Pasang m3 0.0120 239,080 2,868.96
JUMLAH HARGA BAHAN 10,476.96
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 62,826.96
E Overhead & Profit 10% 10% 6,282.70
F Harga Satuan Pekerjaan (D+E) - 69,109.00
A.4.4.3.11. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 100,000 25,000.00
Tukang Batu L.02.03 OH 0.1250 120,000 15,000.00
Kepala tukang L.03.01 OH 0.0130 140,000 1,820.00
Mandor L.04.01 OH 0.0130 150,000 1,950.00
JUMLAH TENAGA KERJA 43,770.00
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh 6.6300 15,000 99,450.00
semen kg 9.8000 1,200 11,760.00
Semen Warna Kg 1.3000 3,500 4,550.00
Pasir Pasang M3 0.0450 255,400 11,493.00
JUMLAH HARGA BAHAN - 127,253.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 171,023.00
E Overhead & Profit 10% 10% 17,102.30
F Harga Satuan Pekerjaan (D+E) - 188,125.00
A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2400 100,000 24,000.00
Tukang Batu L.02.03 OH 0.1200 120,000 14,400.00
Kepala tukang L.03.01 OH 0.0120 140,000 1,680.00
Mandor L.04.01 OH 0.0120 150,000 1,800.00
JUMLAH TENAGA KERJA 41,880.00
B BAHAN
ubin teralux marmer ukuran 60cm x60cm Bh 3.1000 49,500 153,450.00
semen kg 9.6000 1,200 11,520.00
Semen Warna Kg 1.5000 3,500 5,250.00
Pasir Pasang M3 0.0450 255,400 11,493.00
JUMLAH HARGA BAHAN - 181,713.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 223,593.00
E Overhead & Profit 10% 10% 22,359.30
F Harga Satuan Pekerjaan (D+E) - 245,952.00
A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 100,000 25,000.00
Tukang Batu L.02.03 OH 0.1250 120,000 15,000.00
Kepala tukang L.03.01 OH 0.0130 140,000 1,820.00
Mandor L.04.01 OH 0.0130 150,000 1,950.00
JUMLAH TENAGA KERJA 43,770.00
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh 6.6300 38,520 255,387.60
semen kg 9.8000 1,200 11,760.00
Semen Warna Kg 1.3000 3,500 4,550.00
Pasir Pasang M3 0.0450 255,400 11,493.00
JUMLAH HARGA BAHAN - 283,190.60
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 326,960.60
E Overhead & Profit 10% 10% 32,696.06
F Harga Satuan Pekerjaan (D+E) - 359,656.00
A.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2600 100,000 26,000.00
Tukang Batu L.02.03 OH 0.1300 120,000 15,600.00
Kepala tukang L.03.01 OH 0.0130 140,000 1,820.00
Mandor L.04.01 OH 0.0130 150,000 1,950.00
JUMLAH TENAGA KERJA 45,370.00
B BAHAN
ubin teralux marmer ukuran 30cm x30cm Bh 11.8700 35,360 419,723.20
semen kg 10.0000 1,200 12,000.00
Semen Warna Kg 1.5000 3,500 5,250.00
Pasir Pasang M3 0.0450 255,400 11,493.00
JUMLAH HARGA BAHAN - 448,466.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 493,836.20
E Overhead & Profit 10% 10% 49,383.62
F Harga Satuan Pekerjaan (D+E) - 543,219.00
A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 100,000 70,000.00
Tukang Batu L.02.03 OH 0.3500 120,000 42,000.00
Kepala tukang L.03.01 OH 0.0350 140,000 4,900.00
Mandor L.04.01 OH 0.0350 150,000 5,250.00
JUMLAH TENAGA KERJA 122,150.00
B BAHAN
keramik artistik 10cm x 10cm atau 5cm x 20cm Bh 106.0000 3,150 333,900.00
semen Kg 8.1900 1,200 9,828.00
Pasir Pasang M3 0.0450 255,400 11,493.00
Semen Warna Kg 3.2000 3,500 11,200.00
JUMLAH HARGA BAHAN - 366,421.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 488,571.00
E Overhead & Profit 10% 10% 48,857.10
F Harga Satuan Pekerjaan (D+E) - 537,428.00
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 100,000 10,000.00
Tukang kayu L.02.04 OH 0.1000 120,000 12,000.00
Kepala tukang L.03.01 OH 0.0100 140,000 1,400.00
Mandor L.04.01 OH 0.0050 150,000 750.00
JUMLAH TENAGA KERJA 24,150.00
B BAHAN
Tripleks Lembar 0.3750 44,400 16,650.00
Paku tripleks kg 0.0300 19,260 577.80
JUMLAH HARGA BAHAN - 17,227.80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 41,377.80
E Overhead & Profit 10% 10% 4,137.78
F Harga Satuan Pekerjaan (D+E) - 45,515.00
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5000 100,000 50,000.00
Tukang kayu L.02.04 OH 0.5000 120,000 60,000.00
Kepala tukang L.03.01 OH 0.0500 140,000 7,000.00
Mandor L.04.01 OH 0.0250 150,000 3,750.00
JUMLAH TENAGA KERJA 120,750.00
B BAHAN
Profil Allum"T" m 3.6000 14,520 52,272.00
Kawat dia 4 mm kg 0.1500 38,640 5,796.00
Ramset Buah 1.0500 4,750 4,987.50
Akustik 60 x 120 Lembar 1.5000 143,360 215,040.00
JUMLAH HARGA BAHAN - 278,095.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 398,845.50
E Overhead & Profit 10% 10% 39,884.55
F Harga Satuan Pekerjaan (D+E) - 438,730.00
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.0000 100,000 600,000.00
Tukang kayu L.02.04 OH 18.0000 120,000 2,160,000.00
Kepala tukang L.03.01 OH 1.8000 140,000 252,000.00
Mandor L.04.01 OH 0.3000 150,000 45,000.00
JUMLAH TENAGA KERJA 3,057,000.00
B BAHAN
Balok kayu kelas II m3 1.2000 4,500,000 5,400,000.00
Paku 5 - 10 cm Kg 1.2500 16,000 20,000.00
Lem Kayu/Karet Kg 1.0000 - -
JUMLAH HARGA BAHAN - 5,420,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 8,477,000.00
E Overhead & Profit 10% 10% 847,700.00
F Harga Satuan Pekerjaan (D+E) - 9,324,700.00
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, Kayu papan kelas III (papan) kelas III
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 100,000 35,000.00
Tukang kayu L.02.04 OH 1.0500 120,000 126,000.00
Kepala tukang L.03.01 OH 0.1050 140,000 14,700.00
Mandor L.04.01 OH 0.0180 150,000 2,700.00
JUMLAH TENAGA KERJA 178,400.00
B BAHAN
Kayu Kelas III m3 0.0400 3,200,000 128,000.00
Paku 5 - 10 cm Kg 0.0500 16,000 800.00
JUMLAH HARGA BAHAN - 128,800.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 307,200.00
E Overhead & Profit 10% 10% 30,720.00
F Harga Satuan Pekerjaan (D+E) - 337,920.00
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 100,000 100,000.00
Tukang kayu L.02.04 OH 3.0000 120,000 360,000.00
Kepala tukang L.03.01 OH 0.3000 140,000 42,000.00
Mandor L.04.01 OH 0.0500 150,000 7,500.00
JUMLAH TENAGA KERJA 509,500.00
B BAHAN
Kayu Kelas II (Papan) m3 0.0400 5,000,000 200,000.00
Lem Kayu/Karet Kg 0.5000 - -
JUMLAH HARGA BAHAN - 200,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 709,500.00
E Overhead & Profit 10% 10% 70,950.00
F Harga Satuan Pekerjaan (D+E) - 780,450.00
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 100,000 80,000.00
Tukang kayu L.02.04 OH 2.4000 120,000 288,000.00
Kepala tukang L.03.01 OH 0.2400 140,000 33,600.00
Mandor L.04.01 OH 0.0400 150,000 6,000.00
JUMLAH TENAGA KERJA 407,600.00
B BAHAN
Alluminium B m3 0.0240 29,760 714.24
Lem Kayu/Karet Kg 0.3000 - -
JUMLAH HARGA BAHAN - 714.24
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 408,314.24
E Overhead & Profit 10% 10% 40,831.42
F Harga Satuan Pekerjaan (D+E) - 449,145.00
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 100,000 100,000.00
Tukang kayu L.02.04 OH 3.0000 120,000 360,000.00
Kepala tukang L.03.01 OH 0.3000 140,000 42,000.00
Mandor L.04.01 OH 0.0500 150,000 7,500.00
JUMLAH TENAGA KERJA 509,500.00
B BAHAN
Kayu Kelas II ( 5 x 7 cm) m3 0.0640 4,000,000 256,000.00
Lem Kayu/Karet Kg 0.5000 - -
JUMLAH HARGA BAHAN - 256,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 765,500.00
E Overhead & Profit 10% 10% 76,550.00
F Harga Satuan Pekerjaan (D+E) - 842,050.00
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 100,000 70,000.00
Tukang kayu L.02.04 OH 2.1000 120,000 252,000.00
Kepala tukang L.03.01 OH 0.2100 140,000 29,400.00
Mandor L.04.01 OH 0.0350 150,000 5,250.00
JUMLAH TENAGA KERJA 356,650.00
B BAHAN
Kaso 5/7 Kelas II m3 0.0250 3,605,000 90,125.00
Paku 5 - 10 cm kg 0.0300 16,000 480.00
Lem Kayu/Karet kg 0.5000 - -
Plywood 120x240 tbl. 4 mm Lembar 1.0000 72,000 72,000.00
JUMLAH HARGA BAHAN - 162,605.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 519,255.00
E Overhead & Profit 10% 10% 51,925.50
F Harga Satuan Pekerjaan (D+E) - 571,180.00
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 100,000 80,000.00
Tukang kayu L.02.04 OH 2.4000 120,000 288,000.00
Kepala tukang L.03.01 OH 0.2400 140,000 33,600.00
Mandor L.04.01 OH 0.0400 150,000 6,000.00
JUMLAH TENAGA KERJA 407,600.00
B BAHAN
Kayu Kelas II ( 5 x 7 cm) m3 0.0256 4,000,000 102,400.00
Paku 5 - 10 cm kg 0.0300 16,000 480.00
Lem Kayu/Karet kg 0.5000 - -
Plywood 120x240 tbl. 4 mm Lembar 1.0000 72,000 72,000.00
JUMLAH HARGA BAHAN - 174,880.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 582,480.00
E Overhead & Profit 10% 10% 58,248.00
F Harga Satuan Pekerjaan (D+E) - 640,728.00
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.85 100,000 85,000.00
Tukang kayu L.02.04 OH 2.550 120,000 306,000.00
Kepala tukang L.03.01 OH 0.255 140,000 35,700.00
Mandor L.04.01 OH 0.043 150,000 6,450.00
JUMLAH TENAGA KERJA 433,150.00
B BAHAN
Kayu Kelas II ( 5 x 7 cm) m3 0.025 4,000,000 100,000.00
Paku 5 - 10 cm kg 0.03 16,000 480.00
Lem Kayu/Karet kg 0.8 - -
Teakwood 4 mm 90 x 220 cm Lembar 1.000 61,480 61,480.00
Formika Lembar 0.5 111,600 55,800.00
JUMLAH HARGA BAHAN - 217,760.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 650,910.00
E Overhead & Profit 10% 10% 65,091.00
F Harga Satuan Pekerjaan (D+E) - 716,001.00
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.000 100,000 400,000.00
Tukang kayu L.02.04 OH 12.000 120,000 1,440,000.00
Kepala tukang L.03.01 OH 1.200 140,000 168,000.00
Mandor L.04.01 OH 0.2 150,000 30,000.00
JUMLAH TENAGA KERJA 2,038,000.00
B BAHAN
Balok kayu m3 1.100 - -
Besi strip kg 15.000 - -
Paku 5 - 10 cm kg 5.600 16,000 89,600.00
JUMLAH HARGA BAHAN - 89,600.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,127,600.00
E Overhead & Profit 10% 10% 212,760.00
F Harga Satuan Pekerjaan (D+E) - 2,340,360.00
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.15 100,000 15,000.00
Tukang kayu L.02.04 OH 0.3 120,000 36,000.00
Kepala tukang L.03.01 OH 0.03 140,000 4,200.00
Mandor L.04.01 OH 0.075 150,000 11,250.00
JUMLAH TENAGA KERJA 66,450.00
B BAHAN
Kayu balok 5/7 kelas III m3 0.0154 2,499,000 38,484.60
Paku 5 - 10 cm kg 0.2 16,000 3,200.00
JUMLAH HARGA BAHAN - 41,684.60
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 108,134.60
E Overhead & Profit 10% 10% 10,813.46
F Harga Satuan Pekerjaan (D+E) - 118,948.00
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2 100,000 20,000.00
Tukang kayu L.02.04 OH 0.3 120,000 36,000.00
Kepala tukang L.03.01 OH 0.03 140,000 4,200.00
Mandor L.04.01 OH 0.01 150,000 1,500.00
JUMLAH TENAGA KERJA 61,700.00
B BAHAN
Kayu balok 5/7 kelas III m3 0.0163 2,499,000 40,733.70
Paku 5 - 10 cm kg 0.25 16,000 4,000.00
JUMLAH HARGA BAHAN - 44,733.70
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 106,433.70
E Overhead & Profit 10% 10% 10,643.37
F Harga Satuan Pekerjaan (D+E) - 117,077.00
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 100,000 10,000.00
Tukang kayu L.02.04 OH 0.2 120,000 24,000.00
Kepala tukang L.03.01 OH 0.02 140,000 2,800.00
Mandor L.04.01 OH 0.005 150,000 750.00
JUMLAH TENAGA KERJA 37,550.00
B BAHAN
Kayu papan kelas III (papan) m3 0.0108 1,710,000 18,468.00
Paku 5 - 10 cm kg 0.1 16,000 1,600.00
JUMLAH HARGA BAHAN - 20,068.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 57,618.00
E Overhead & Profit 10% 10% 5,761.80
F Harga Satuan Pekerjaan (D+E) - 63,379.00
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 100,000 10,000.00
Tukang kayu L.02.04 OH 0.2 120,000 24,000.00
Kepala tukang L.03.01 OH 0.02 140,000 2,800.00
Mandor L.04.01 OH 0.005 150,000 750.00
JUMLAH TENAGA KERJA 37,550.00
B BAHAN
Kayu papan kelas III (papan) m3 0.011 2,800,000 30,800.00
Paku 5 - 10 cm kg 0.05 16,000 800.00
JUMLAH HARGA BAHAN - 31,600.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 69,150.00
E Overhead & Profit 10% 10% 6,915.00
F Harga Satuan Pekerjaan (D+E) - 76,065.00
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.15 100,000 15,000.00
Tukang kayu L.02.04 OH 0.45 120,000 54,000.00
Kepala tukang L.03.01 OH 0.045 140,000 6,300.00
Mandor L.04.01 OH 0.008 150,000 1,200.00
JUMLAH TENAGA KERJA 76,500.00
B BAHAN
Balok kayu m3 0.028 - -
Paku 5 - 10 cm kg 0.15 16,000 2,400.00
JUMLAH HARGA BAHAN - 2,400.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 78,900.00
E Overhead & Profit 10% 10% 7,890.00
F Harga Satuan Pekerjaan (D+E) - 86,790.00
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari Kayu papan kelas III (papan) kelas I
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.600 100,000 60,000.00
Tukang kayu L.02.04 OH 1.800 120,000 216,000.00
Kepala tukang L.03.01 OH 0.180 140,000 25,200.00
Mandor L.04.01 OH 0.030 150,000 4,500.00
JUMLAH TENAGA KERJA 305,700.00
B BAHAN
Kayu papan kelas III (papan) m3 0.007 2,800,000 19,600.00
Paku 5 - 10 cm kg 0.100 16,000 1,600.00
Paku skrup kg 0.150 60,000 9,000.00
JUMLAH HARGA BAHAN - 30,200.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 335,900.00
E Overhead & Profit 10% 10% 33,590.00
F Harga Satuan Pekerjaan (D+E) - 369,490.00
A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka Kayu papan kelas III (papan) kelas III atau IV
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.100 100,000 10,000.00
Tukang kayu L.02.04 OH 0.050 120,000 6,000.00
Kepala tukang L.03.01 OH 0.005 140,000 700.00
Mandor L.04.01 OH 0.005 150,000 750.00
JUMLAH TENAGA KERJA 17,450.00
B BAHAN
Bilik bambu m2 1.500 81,750 122,625.00
Kayu balok 5/7 kelas III m3 0.014 2,499,000 34,986.00
Paku 5 - 10 cm kg 0.012 16,000 192.00
List kayu 2/4 m3 0.003 6,765,000 20,295.00
JUMLAH HARGA BAHAN - 178,098.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 195,548.00
E Overhead & Profit 10% 10% 19,554.80
F Harga Satuan Pekerjaan (D+E) - 215,102.00
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 100,000 7,000.00
Tukang cat L.02.08 OH 0.009 120,000 1,080.00
Kepala tukang L.03.01 OH 0.006 140,000 840.00
Mandor L.04.01 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 9,370.00
B BAHAN
Cat menie Kg 0.200 102,000 20,400.00
Plamuur Kg 0.150 - -
Cat dasar Kayu Kg 0.170 38,130 6,482.10
Cat Penutup Kayu Kg 0.260 62,500 16,250.00
Kuas Bh 0.010 30,000 300.00
Pengencer Kg 0.030 43,400 1,302.00
Ampelas Lbr 0.200 8,130 1,626.00
JUMLAH HARGA BAHAN - 46,360.10
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 55,730.10
E Overhead & Profit 10% 10% 5,573.01
F Harga Satuan Pekerjaan (D+E) - 61,303.00
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 100,000 7,000.00
Tukang cat L.02.08 OH 0.105 120,000 12,600.00
Kepala tukang L.03.01 OH 0.004 140,000 560.00
Mandor L.04.01 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 20,610.00
B BAHAN
Cat menie Kg 0.200 102,000 20,400.00
Plamuur Kg 0.150 - -
Cat dasar Kayu Kg 0.170 38,130 6,482.10
Cat Penutup Kayu Kg 0.350 62,500 21,875.00
Kuas Bh 0.010 30,000 300.00
Pengencer Kg 0.030 43,400 1,302.00
Ampelas Lbr 0.200 8,130 1,626.00
JUMLAH HARGA BAHAN - 51,985.10
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 72,595.10
E Overhead & Profit 10% 10% 7,259.51
F Harga Satuan Pekerjaan (D+E) - 79,854.00
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.020 100,000 2,000.00
Tukang cat L.02.08 OH 0.069 120,000 8,280.00
Kepala tukang L.03.01 OH 0.006 140,000 882.00
Mandor L.04.01 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 11,612.00
B BAHAN
Plamir Kg 0.010 17,500 175.00
Cat dasar Tembok Kg 0.100 115,000 11,500.00
Cat Tembok Interior Kg 0.260 80,000 20,800.00
JUMLAH HARGA BAHAN - 32,475.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 44,087.00
E Overhead & Profit 10% 10% 4,408.70
F Harga Satuan Pekerjaan (D+E) - 48,495.00
A.4.7.1.10. a Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) eksterior
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.020 100,000 2,000.00
Tukang cat L.02.08 OH 0.069 120,000 8,280.00
Kepala tukang L.03.01 OH 0.006 140,000 882.00
Mandor L.04.01 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 11,612.00
B BAHAN
Plamir Kg 0.010 17,500 175.00
Cat dasar Tembok Kg 0.100 115,000 11,500.00
Cat Tembok Eksterior Kg 0.260 115,000 29,900.00
JUMLAH HARGA BAHAN - 41,575.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 53,187.00
E Overhead & Profit 10% 10% 5,318.70
F Harga Satuan Pekerjaan (D+E) - 58,505.00
cat tembok lama
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.028 100,000 2,800.00
Tukang cat L.02.08 OH 0.042 120,000 5,040.00
Kepala tukang L.03.01 OH 0.004 140,000 588.00
Mandor L.04.01 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 8,878.00
B BAHAN
Cat dasar Tembok Kg 0.120 115,000 13,800.00
Cat Penutup Tembok Kg 0.180 115,000 20,700.00
JUMLAH HARGA BAHAN - 34,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 43,378.00
E Overhead & Profit 10% 10% 4,337.80
F Harga Satuan Pekerjaan (D+E) - 47,715.00
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.060 100,000 6,000.00
Tukang cat L.02.08 OH 0.060 120,000 7,200.00
Kepala tukang L.03.01 OH 0.012 140,000 1,680.00
Mandor L.04.01 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 15,330.00
B BAHAN
Cat Besi Kg 0.300 70,000 21,000.00
Kuas Bh 0.010 30,000 300.00
Pengencer L 0.010 43,400 434.00
JUMLAH HARGA BAHAN - 21,734.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 37,064.00
E Overhead & Profit 10% 10% 3,706.40
F Harga Satuan Pekerjaan (D+E) - 40,770.00
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.400 100,000 40,000.00
Tukang cat L.02.08 OH 0.700 120,000 84,000.00
Kepala tukang L.03.01 OH 0.070 140,000 9,800.00
Mandor L.04.01 OH 0.020 150,000 3,000.00
JUMLAH TENAGA KERJA 136,800.00
B BAHAN
Cat Besi Kg 0.300 70,000 21,000.00
Pengencer L 0.010 43,400 434.00
JUMLAH HARGA BAHAN - 21,434.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 158,234.00
E Overhead & Profit 10% 10% 15,823.40
F Harga Satuan Pekerjaan (D+E) - 174,057.00
A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.000 100,000 600,000.00
Tukang batu L.02.03 OH 3.000 120,000 360,000.00
Kepala tukang L.03.01 OH 0.300 140,000 42,000.00
Mandor L.04.01 OH 0.030 150,000 4,500.00
JUMLAH TENAGA KERJA 1,006,500.00
B BAHAN
Bata merah M3 150.000 500 75,000.00
semen Kg 120.000 1,200 144,000.00
Pasir pasang M3 0.300 255,400 76,620.00
Porselen 11x11 bh 360.000 6,240 2,246,400.00
Semen warna Kg 6.000 3,500 21,000.00
JUMLAH HARGA BAHAN - 2,563,020.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 3,569,520.00
E Overhead & Profit 10% 10% 356,952.00
F Harga Satuan Pekerjaan (D+E) - 3,926,472.00
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.160 100,000 216,000.00
Tukang batu L.02.03 OH 0.720 120,000 86,400.00
Kepala tukang L.03.01 OH 0.072 140,000 10,080.00
Mandor L.04.01 OH 0.011 150,000 1,650.00
JUMLAH TENAGA KERJA 314,130.00
B BAHAN
Bata merah bh 40.000 500 20,000.00
semen Kg 44.000 1,200 52,800.00
Pasir pasang M3 0.070 255,400 17,878.00
Pasir beton M3 0.060 257,600 15,456.00
Kerikil M3 0.070 350,000 24,500.00
Baja tulangan Kg 1.600 13,750 22,000.00
JUMLAH HARGA BAHAN - 152,634.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 466,764.00
E Overhead & Profit 10% 10% 46,676.40
F Harga Satuan Pekerjaan (D+E) - 513,440.00
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.200 100,000 320,000.00
Tukang batu L.02.03 OH 1.150 120,000 138,000.00
Kepala tukang L.03.01 OH 0.011 140,000 1,540.00
Mandor L.04.01 OH 0.016 150,000 2,400.00
JUMLAH TENAGA KERJA 461,940.00
B BAHAN
Bata merah bh 70.000 500 35,000.00
semen Kg 77.000 1,200 92,400.00
Pasir pasang M3 0.130 255,400 33,202.00
Pasir beton M3 0.090 257,600 23,184.00
Kerikil M3 0.020 350,000 7,000.00
Baja tulangan Kg 2.600 13,750 35,750.00
JUMLAH HARGA BAHAN - 226,536.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 688,476.00
E Overhead & Profit 10% 10% 68,847.60
F Harga Satuan Pekerjaan (D+E) - 757,323.00
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.200 100,000 320,000.00
Tukang batu L.02.03 OH 1.150 120,000 138,000.00
Kepala tukang L.03.01 OH 0.011 140,000 1,540.00
Mandor L.04.01 OH 0.016 150,000 2,400.00
JUMLAH TENAGA KERJA 461,940.00
B BAHAN
Bata merah bh 123.000 500 61,500.00
semen Kg 114.000 1,200 136,800.00
Pasir pasang M3 0.184 255,400 46,993.60
Pasir beton M3 0.120 257,600 30,912.00
Kerikil M3 0.033 350,000 11,550.00
Baja tulangan Kg 4.850 13,750 66,687.50
JUMLAH HARGA BAHAN - 354,443.10
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 816,383.10
E Overhead & Profit 10% 10% 81,638.31
F Harga Satuan Pekerjaan (D+E) - 898,021.00
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.060 100,000 6,000.00
Tukang batu L.02.03 OH 0.030 120,000 3,600.00
Kepala tukang L.03.01 OH 0.003 140,000 420.00
Mandor L.04.01 OH 0.003 150,000 450.00
JUMLAH TENAGA KERJA 10,470.00
B BAHAN
Pipa tanah Bh 1.600 56,270 90,032.00
semen Kg 0.680 1,200 816.00
Pasir pasang M3 0.013 255,400 3,320.20
Pasir urug M3 0.011 239,370 2,633.07
JUMLAH HARGA BAHAN - 96,801.27
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 107,271.27
E Overhead & Profit 10% 10% 10,727.13
F Harga Satuan Pekerjaan (D+E) - 117,998.00
A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6460 100,000 164,600.00
Tukang pipa L.02.13 OH 0.8230 120,000 98,760.00
Mandor L.04.01 OH 0.1650 150,000 24,750.00
JUMLAH TENAGA KERJA 288,110.00
B BAHAN
Pipa Ø 100 mm bh 1.0000 86,330 86,330.00
JUMLAH HARGA BAHAN 86,330.00
C PERALATAN
Bahan potong pipa T2/mekanik / cilinder hari 0.6500 656,500 426,725.00
Sewa Genset 1500 watt hari 0.1590 321,300 51,086.70
Sewa Pompa Submersible 3m3/h hari 1.0780 287,000 309,386.00
Sewa Tripot/Tackel & handle crane 2 T hari 0.9110 500,850 456,274.35
JUMLAH HARGA ALAT - 1,243,472.05
D Jumlah (A+B+C) - 1,617,912.05
E Overhead & Profit 10% 10% 161,791.21
F Harga Satuan Pekerjaan (D+E) - 1,779,703.00
A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.0960 100,000 209,600.00
Tukang pipa L.02.13 OH 1.0480 120,000 125,760.00
Mandor L.04.01 OH 0.2100 150,000 31,500.00
JUMLAH TENAGA KERJA 366,860.00
B BAHAN
Pipa Ø 150 mm bh 1.0000 108,300 108,300.00
JUMLAH HARGA BAHAN 108,300.00
C PERALATAN
Bahan potong pipa T2/mekanik / cilinder hari 0.7600 656,500 498,940.00
Sewa Genset 1500 watt hari 0.3690 321,300 118,559.70
Sewa Pompa Submersible 3m3/h hari 1.3530 287,000 388,311.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.0260 500,850 513,872.10
JUMLAH HARGA ALAT - 1,519,682.80
D Jumlah (A+B+C) - 1,994,842.80
E Overhead & Profit 10% 10% 199,484.28
F Harga Satuan Pekerjaan (D+E) - 2,194,327.00
A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.5460 100,000 254,600.00
Tukang pipa L.02.13 OH 1.2730 120,000 152,760.00
Mandor L.04.01 OH 0.2550 150,000 38,250.00
JUMLAH TENAGA KERJA 445,610.00
B BAHAN
Pipa Ø 200 mm bh 1.0000 186,900 186,900.00
JUMLAH HARGA BAHAN 186,900.00
C PERALATAN
Bahan potong pipa T2/mekanik / cilinder hari 0.8700 656,500 571,155.00
Sewa Genset 1500 watt hari 0.5790 321,300 186,032.70
Sewa Pompa Submersible 3m3/h hari 1.6280 287,000 467,236.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.1410 500,850 571,469.85
JUMLAH HARGA ALAT - 1,795,893.55
D Jumlah (A+B+C) - 2,428,403.55
E Overhead & Profit 10% 10% 242,840.36
F Harga Satuan Pekerjaan (D+E) - 2,671,243.00
A.8.4.4.5 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.9960 100,000 299,600.00
Tukang pipa L.02.13 OH 1.4980 120,000 179,760.00
Mandor L.04.01 OH 0.3000 150,000 45,000.00
JUMLAH TENAGA KERJA 524,360.00
B BAHAN
Pipa Ø 250 mm bh 1.0000 275,000 275,000.00
JUMLAH HARGA BAHAN 275,000.00
C PERALATAN
Bahan potong pipa T2/mekanik / cilinder hari 0.9800 656,500 643,370.00
Sewa Genset 1500 watt hari 0.7890 321,300 253,505.70
Sewa Pompa Submersible 3m3/h hari 1.9030 287,000 546,161.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.2560 500,850 629,067.60
JUMLAH HARGA ALAT - 2,072,104.30
D Jumlah (A+B+C) - 2,871,464.30
E Overhead & Profit 10% 10% 287,146.43
F Harga Satuan Pekerjaan (D+E) - 3,158,610.00
A.8.4.4.6 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4460 100,000 344,600.00
Tukang pipa L.02.13 OH 1.7230 120,000 206,760.00
Mandor L.04.01 OH 0.3450 150,000 51,750.00
JUMLAH TENAGA KERJA 603,110.00
B BAHAN
Pipa Ø 300 mm bh 1.0000 337,680 337,680.00
JUMLAH HARGA BAHAN 337,680.00
C PERALATAN
Bahan potong pipa T2/mekanik / cilinder hari 1.0900 656,500 715,585.00
Sewa Genset 1500 watt hari 0.9990 321,300 320,978.70
Sewa Pompa Submersible 3m3/h hari 2.1780 287,000 625,086.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.3710 500,850 686,665.35
JUMLAH HARGA ALAT - 2,348,315.05
D Jumlah (A+B+C) - 3,289,105.05
E Overhead & Profit 10% 10% 328,910.51
F Harga Satuan Pekerjaan (D+E) - 3,618,015.00
A.8.4.4.7 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.3460 100,000 434,600.00
Tukang pipa L.02.13 OH 2.1730 120,000 260,760.00
Mandor L.04.01 OH 0.4350 150,000 65,250.00
JUMLAH TENAGA KERJA 760,610.00
B BAHAN
Pipa Ø 400 mm bh 1.0000 342,720 342,720.00
JUMLAH HARGA BAHAN 342,720.00
C PERALATAN
Bahan potong pipa T2/mekanik / cilinder hari 1.3100 656,500 860,015.00
Sewa Genset 1500 watt hari 1.4190 321,300 455,924.70
Sewa Pompa Submersible 3m3/h hari 2.7280 287,000 782,936.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.6010 500,850 801,860.85
JUMLAH HARGA ALAT - 2,900,736.55
D Jumlah (A+B+C) - 4,004,066.55
E Overhead & Profit 10% 10% 400,406.66
F Harga Satuan Pekerjaan (D+E) - 4,404,473.00
A.8.4.4.8 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.7960 100,000 479,600.00
Tukang pipa L.02.13 OH 2.3980 120,000 287,760.00
Mandor L.04.01 OH 0.4800 150,000 72,000.00
JUMLAH TENAGA KERJA 839,360.00
B BAHAN
Pipa Ø 450 mm bh 1.0000 538,020 538,020.00
JUMLAH HARGA BAHAN 538,020.00
C PERALATAN
Bahan potong pipa T2/mekanik / cilinder hari 1.4200 656,500 932,230.00
Sewa Genset 1500 watt hari 1.6290 321,300 523,397.70
Sewa Pompa Submersible 3m3/h hari 3.0030 287,000 861,861.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.7160 500,850 859,458.60
JUMLAH HARGA ALAT - 3,176,947.30
D Jumlah (A+B+C) - 4,554,327.30
E Overhead & Profit 10% 10% 455,432.73
F Harga Satuan Pekerjaan (D+E) - 5,009,760.00
A.8.4.4.9 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5.2460 100,000 524,600.00
Tukang pipa L.02.13 OH 2.6230 120,000 314,760.00
Mandor L.04.01 OH 0.5250 150,000 78,750.00
JUMLAH TENAGA KERJA 918,110.00
B BAHAN
Pipa Ø 500 mm bh 1.0000 528,640 528,640.00
JUMLAH HARGA BAHAN 528,640.00
C PERALATAN
Bahan potong pipa T2/mekanik / cilinder hari 1.5300 656,500 1,004,445.00
Sewa Genset 1500 watt hari 1.8390 321,300 590,870.70
Sewa Pompa Submersible 3m3/h hari 3.2780 287,000 940,786.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.8310 500,850 917,056.35
JUMLAH HARGA ALAT - 3,453,158.05
D Jumlah (A+B+C) - 4,899,908.05
E Overhead & Profit 10% 10% 489,990.81
F Harga Satuan Pekerjaan (D+E) - 5,389,898.00
A.8.4.4.10 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.1460 100,000 614,600.00
Tukang pipa L.02.13 OH 3.0730 120,000 368,760.00
Mandor L.04.01 OH 0.6150 150,000 92,250.00
JUMLAH TENAGA KERJA 1,075,610.00
B BAHAN
Pipa Ø 600 mm bh 1.0000 629,160 629,160.00
JUMLAH HARGA BAHAN 629,160.00
C PERALATAN
Bahan potong pipa T2/mekanik / cilinder hari 1.7500 656,500 1,148,875.00
Sewa Genset 1500 watt hari 2.2590 321,300 725,816.70
Sewa Pompa Submersible 3m3/h hari 3.8280 287,000 1,098,636.00
Sewa Tripot/Tackel & handle crane 2 T hari 2.0610 500,850 1,032,251.85
JUMLAH HARGA ALAT - 4,005,579.55
D Jumlah (A+B+C) - 5,710,349.55
E Overhead & Profit 10% 10% 571,034.96
F Harga Satuan Pekerjaan (D+E) - 6,281,384.00
A.8.4.4.11 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.0460 100,000 704,600.00
Tukang pipa L.02.13 OH 3.5230 120,000 422,760.00
Mandor L.04.01 OH 0.7050 150,000 105,750.00
JUMLAH TENAGA KERJA 1,233,110.00
B BAHAN
Pipa Ø 700 mm bh 1.0000 785,400 785,400.00
JUMLAH HARGA BAHAN 785,400.00
C PERALATAN
Bahan potong pipa T2/mekanik / cilinder hari 1.9700 656,500 1,293,305.00
Sewa Genset 1500 watt hari 2.6790 321,300 860,762.70
Sewa Pompa Submersible 3m3/h hari 4.3780 287,000 1,256,486.00
Sewa Tripot/Tackel & handle crane 2 T hari 2.2910 500,850 1,147,447.35
JUMLAH HARGA ALAT - 4,558,001.05
D Jumlah (A+B+C) - 6,576,511.05
E Overhead & Profit 10% 10% 657,651.11
F Harga Satuan Pekerjaan (D+E) - 7,234,162.00
A.8.4.4.12 (K3) Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.9460 100,000 794,600.00
Tukang pipa L.02.13 OH 3.9730 120,000 476,760.00
Mandor L.04.01 OH 0.7950 150,000 119,250.00
JUMLAH TENAGA KERJA 1,390,610.00
B BAHAN
Pipa Ø 800 mm bh 1.0000 755,520 755,520.00
JUMLAH HARGA BAHAN 755,520.00
C PERALATAN
Bahan potong pipa T2/mekanik / cilinder hari 2.1900 656,500 1,437,735.00
Sewa Genset 1500 watt hari 3.0990 321,300 995,708.70
Sewa Pompa Submersible 3m3/h hari 4.9280 287,000 1,414,336.00
Sewa Tripot/Tackel & handle crane 2 T hari 2.5210 500,850 1,262,642.85
JUMLAH HARGA ALAT - 5,110,422.55
D Jumlah (A+B+C) - 7,256,552.55
E Overhead & Profit 10% 10% 725,655.26
F Harga Satuan Pekerjaan (D+E) - 7,982,207.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
1 2 3 4
A. UPAH KERJA
.
1 Pekerja L.1 oh Rp 100,000.00
2 Tukang L.2 oh Rp 120,000.00
3 Tukang Atap L.3 oh Rp 120,000.00
4 Tukang batu L.4 oh Rp 120,000.00
5 Tukang Besi L.5 oh Rp 120,000.00
6 Tukang Besi Konstruksi L.6 oh Rp 120,000.00
7 Tukang cat L.7 oh Rp 120,000.00
8 Tukang ereksi L.8 oh Rp 120,000.00
9 Tukang Pancang L.9 oh Rp 120,000.00
10 Tukang Kayu/Bekisting L.10 oh Rp 120,000.00
11 Tukang gambar L.11 oh Rp 120,000.00
12 Tukang Interior L.12 oh Rp 120,000.00
13 Tukang Kayu L.13 oh Rp 120,000.00
14 Tukang Las L.14 oh Rp 120,000.00
15 Tukang Las Konstruksi L.15 oh Rp 120,000.00
16 Tukang Listrik L.16 oh Rp 120,000.00
17 Tukang Pipa L.17 oh Rp 120,000.00
18 Tukang Plafon L.18 oh Rp 120,000.00
19 Tukang Prodo L.19 oh Rp 120,000.00
20 Tukang Ukir L.20 oh Rp 120,000.00
21 Tukang vibrator L.21 oh Rp 120,000.00
22 Tukang Bor L.22 oh Rp 120,000.00
23 Tukang cat dan tulis *) L.23 oh Rp 120,000.00
24 Tukang Jahit L.24 oh Rp 120,000.00
25 Tukang Las biasa L.25 oh Rp 120,000.00
26 Tukang Las Listrik L.26 oh Rp 120,000.00
27 Tukang penganyam L.27 oh Rp 120,000.00
28 Tukang Gali L.28 oh Rp 120,000.00
29 Tukang gali sumur L.29 oh Rp 120,000.00
30 Mandor L.30 oh Rp 150,000.00
31 Operator L.31 oh Rp 150,000.00
32 Pembantu Operator L.32 oh Rp 100,000.00
33 Sopir / Driver L.33 Rp 125,000.00
34 Pembantu Sopir / Driver L.34 oh Rp 100,000.00
35 Mekanik L.35 oh Rp 150,000.00
36 Pembantu Mekanik L.36 oh Rp 100,000.00
37 Kepala Tukang L.37 oh Rp 140,000.00
38 Instalatir Listrik L.38 oh Rp 150,000.00
39 Petugas K3 (safety Officer) Rp 3,600,000.00
BAHAN
40 Abu Batu 0/0,5 M3 Rp 399,100.00
41 Acrylic Bening 10 mm 1 m x 2 m Lembar Rp 1,500,000.00
42 Acrylic Bening 2 mm 100 cm x 200 cm Lembar Rp 340,000.00
43 Acrylic Bening 3 mm 100 cm x 200 cm Lembar Rp 465,000.00
44 Acrylic Bening 8 mm 100 cm x 200 cm Lembar Rp 1,250,000.00
45 Acrylic Hitam Dof 2 mm , uk.100 x 200cm Lembar Rp 425,000.00
46 Acrylic Kuning 3 mm - kode 235 A1 100cm x 200 cm Lembar Rp 580,000.00
47 Acrylic Susu 3 mm 100 cm x 200 cm Lembar Rp 560,000.00
48 Additive Liter Rp 43,000.00
49 Air Liter Rp 100.00
50 Alat Bantu Set Rp 75,000.00
51 Almunium Composit M2 Rp 650,000.00
52 Almunium Foil M2 Rp 10,000.00
53 Amplas Lembar Rp 7,000.00
54 Asbes Gelombang 1.8 x 0.8 x 0.35 m Lembar Rp 40,000.00
55 Asbes Gelombang 1.8 x 1.05 x 0.4 m Lembar Rp 40,000.00
56 Nok Asbes Bh Rp 28,000.00
57 Nok Asbes Gelombang Kecil Bh Rp 30,000.00
58 Aspal pen 60/70 Kg Rp 13,310.00
59 Automatic pompa Buah Rp 60,000.00
60 Baja Sling dia. 12 mm M' Rp 40,000.00
61 Baja Sling dia. 14 mm M' Rp 45,000.00
62 Baja Sling dia. 16 mm M' Rp 55,000.00
63 Baja Sling dia. 18 mm M' Rp 75,000.00
64 Baja Sling dia. 20 mm M' Rp 85,000.00
65 Baja Sling dia. 25 mm M' Rp 125,000.00
66 Baja Strip Kg Rp 12,000.00
67 Bak Mandi Fiber 60,60,6 Buah Rp 250,000.00
68 Bak Mandi Plastik Buah Rp 250,000.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
69 Batako Buah Rp 4,500.00
70 Bathtube Buah Rp 3,000,000.00
71 Batu Alam Kota Agung M2 Rp 70,000.00
72 Batu Alam Palimanan M2 Rp 135,000.00
73 Batu Andesit 30 x 30 cm M2 Rp 160,000.00
74 Bata merah Buah Rp 500.00
75 Batu Bata Bolong Buah Rp 650.00
76 Batu Bata Ringan Buah Rp 12,350.00
77 Batu Belah M3 Rp 280,000.00
78 Batu Belah Putih M3 Rp 270,000.00
79 Batu Candi M2 Rp 150,000.00
80 Batu Kali Besar M3 Rp 150,000.00
81 Batu Koral Sikat M2 Rp 60,000.00
82 Batu Koral Sikat (Pasang dengan bahan) M2 Rp 175,000.00
83 Batu Andesit M2 Rp 150,000.00
84 Batu Muka M2 Rp 60,000.00
85 Batu pecah 0,5 - 1 cm / Screning M3 Rp 340,600.00
86 Batu pecah 1 - 2 cm A.1 M3 Rp 404,600.00
87 Batu pecah 10 - 15 cm (onderlaag H) A.2 M3 Rp 338,200.00
88 Batu Pecah 15 - 20 cm (onderlaag K) A.3 M3 Rp 350,100.00
89 Batu pecah 2 - 3 cm A.4 M3 Rp 397,000.00
90 Batu pecah 3 - 5 cm A.5 M3 Rp 373,100.00
91 Batu pecah 5 - 7 cm A.6 M3 Rp 378,900.00
92 Batu pecah 7 - 10 cm A.7 M3 Rp 378,900.00
93 Baut hitam dia. 16 mm A.8 Buah Rp 19,000.00
94 Baut hitam dia. 19 mm A.9 Buah Rp 20,000.00
95 Base A A.10 M3 Rp 392,800.00
96 Base B A.11 M3 Rp 340,000.00
97 Bensin (Non Subsidi) A.12 Liter Rp 9,600.00
98 Besi Baja Profil A.13 Kg Rp 15,000.00
99 Besi Beton A.14 Kg Rp 13,750.00
100 Besi Beton Polos A.15 Kg Rp 13,750.00
101 Besi Wire mess M6 (210x540) A.16 lbr Rp 350,000.00
102 Besi Wire mess M8 (210x540) A.17 lbr Rp 640,000.00
103 Besi Hollow Plafond Meni 2x4 A.18 m Rp 13,500.00
104 Besi Hollow Plafond Meni 4x4 A.19 m Rp 16,500.00
105 Besi Hollow Plafond Galvanis 2x4 A.20 m Rp 17,000.00
106 Besi Hollow Plafond Galvanis 4x4 A.21 m Rp 22,000.00
107 Besi Plat Baja Motif A.22 Kg Rp 12,000.00
108 Besi Plat Baja Polos A.23 Kg Rp 12,000.00
109 Box meter A.24 Buah Rp 35,000.00
110 Box Culvert 500 x 500, L = 1 m A.25 Unit Rp 1,986,250.00
111 Box Culvert 600 x 600, L = 1 m A.26 Unit Rp 2,370,000.00
112 Box Culvert 800 x 800, L = 1 m A.27 Unit Rp 3,130,000.00
113 Box Culvert 1000 x 1000, L = 1 m A.28 Unit Rp 6,848,300.00
114 Box Culvert 1500 x 1500, L = 1 m A.29 Unit Rp 7,395,000.00
115 Box Culvert 2000 x 2000, L = 1 m A.30 Unit Rp 14,369,000.00
116 Buis beton Ø 20 cm tidak bertulang M.2 M' Rp 70,000.00
117 Buis beton Ø 30 cm tidak bertulang M.3 M' Rp 75,000.00
118 Buis beton Ø 40 cm tidak bertulang M.4 M' Rp 135,000.00
119 Buis beton Ø 50 cm tidak bertulang M.5 M' Rp 150,000.00
120 Buis beton Ø 60 cm bertulang M.6 M' Rp 350,000.00
121 Buis beton Ø 60 cm tidak bertulang M.7 M' Rp 300,000.00
122 Buis beton Ø 70 cm bertulang M.8 M' Rp 400,000.00
123 Buis beton Ø 80 cm bertulang M.9 M' Rp 475,000.00
124 Buis beton Ø 80 cm tidak bertulang M.10 M' Rp 400,000.00
125 Buis beton Ø 90 cm tidak bertulang M.11 M' Rp 500,000.00
126 Buis beton Ø 90 cm bertulang M.12 M' Rp 550,000.00
127 Buis beton Ø 100 cm bertulang M.13 M' Rp 650,000.00
128 Cat Alkali/Dasar M.14 Kg Rp 68,000.00
129 Cat Anti Karat (galvanis) M.15 Kg Rp 80,000.00
130 Cat Besi M.16 Kg Rp 70,000.00
131 Cat Genteng M.17 Kg Rp 70,000.00
132 Cat Penutup Kayu M.18 Kg Rp 62,500.00
133 Cat Marka (non Thermoplas) M.19 Kg Rp 40,400.00
134 Cat Marka (Thermoplastic) M.20 Kg Rp 88,000.00
135 Cat menie M.21 Kg Rp 102,000.00
136 Cat Tembok Eksterior M.22 Kg Rp 115,000.00
137 Cat Tembok Interior M.23 Kg Rp 80,000.00
138 Cat Waterproofing M.24 Kg Rp 55,000.00
139 Cat Tembok Anti Bakteri M.25 Kg Rp 52,000.00
140 Cat Scotlight/Fluorescent M.26 Kg Rp 132,000.00
141 Dolken kayu Ø 8-10/400 cm M.27 Btg Rp 25,000.00
142 Closet Duduk Keramik Granit (Natural) M.28 Buah Rp 2,900,000.00
143 Closet Jongkok Keramik Granit M.29 Buah Rp 375,000.00
144 Dempul Besi M.30 Kg Rp 76,000.00
145 Dempul Kayu M.31 Kg Rp 40,000.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
146 Door Closer M.32 Buah Rp 300,000.00
147 Elastomer Ukuran 350mm x 400mm x 52mm M.33 Buah Rp 1,240,000.00
148 Elastomer Ukuran 450mm x 650mm x 71 mm M.34 Buah Rp 3,540,000.00
149 Engsel Jendela M.35 Buah Rp 20,000.00
150 Engsel Pintu M.36 Buah Rp 40,000.00
151 Filler M.40 Kg Rp 37,000.00
152 Formika 120 x 240 cm Lembar Rp 320,000.00
153 Floor Deck EFF 1000 mm tebal 0,75 mm M.41 M2 Rp 124,000.00
154 Floor Drain Plastik M.42 Buah Rp 20,000.00
155 Floor Drain Stenless M.43 Buah Rp 150,000.00
156 Floor Hardener MU-700 M.44 Kg Rp 3,625.00
157 Folding Gate M.46 M2 Rp 1,200,000.00
158 Handle Almunium Set Rp 40,000.00
159 Frame Jendela Alumunium 4" M.47 m' Rp 110,000.00
160 Frame Jendela Aluminium caouder Couting 4" Ponder M.48 m' Rp 110,000.00
161 Frame Jendela Alumunium Coklat 4" coating M.49 m' Rp 130,000.00
162 Gebalan Rumput M.50 M2 Rp 35,000.00
163 Genteng Beton Gelombang M.51 Buah Rp 10,000.00
164 Genteng Beton Flat M.52 Buah Rp 12,000.00
165 Genteng Glasur Kecil M.53 Buah Rp 8,500.00
166 Genteng Kramik M.54 Buah Rp 15,000.00
167 Genteng Mantili M.55 Buah Rp 1,250.00
168 Genteng Metal berpasir uk. 0,77x1 m, t = 0,4 mm M.56 M2 Rp 164,935.06
169 Genteng Metal polos uk. 0,88x0,88, t = 0,25 mm M2 Rp 68,624.56
170 Genteng Plentong M.57 Buah Rp 1,500.00
171 Nok Genteng Beton M.58 Buah Rp 15,000.00
172 Nok Genteng Kramik / Glasur M.59 Buah Rp 15,000.00
173 Nok Genteng Mantili M.60 Buah Rp 3,000.00
174 Nok Genteng Metal Polos B M.61 M Rp 30,000.00
175 Nok Genteng Metal Polos K M.62 M Rp 29,000.00
176 Nok Genteng Metal Pasir M.63 M Rp 47,000.00
177 Nok Genteng Plentong M.64 bh Rp 900.00
178 Geribik uk. 2 x 2 m M.65 Lbr Rp 80,000.00
179 Glass Bead M.66 Kg Rp 66,000.00
180 Glass Block M.67 Buah Rp 25,000.00
183 Grandel Pintu pendek M.70 Buah Rp 25,000.00
184 Grandel Pintu panjang M.71 Buah Rp 50,000.00
185 Grandel Pintu tanam set Rp 150,000.00
186 Grendel Jendela M.72 Buah Rp 25,000.00
187 Granit Tile 40 x 40 cm M.73 Buah Rp 28,000.00
188 Granit Tile 60 x 60 cm M.74 Buah Rp 130,000.00
190 Grass Block 8 x 30 x 45 cm M.76 M2 Rp 115,500.00
191 GRC Tebal 4 mm M.77 Lembar Rp 70,000.00 2.928 Rp 23,907.10
192 GRC Tebal 6 mm M.78 Lembar Rp 125,000.00
193 GRC Tebal 9 mm M.79 Lembar Rp 200,000.00
194 Gypsum board M.80 Lembar Rp 73,000.00
195 Hak Angin / Pengkait M.81 Buah Rp 25,000.00
196 Engsel Angin (Cashement) M.82 Buah Rp 50,000.00
197 Ijuk M.83 Ikat Rp 25,000.00
198 Jendela nako (rangka + kaca 5 mm) M.84 M2 Rp 95,000.00
199 Kabel NYA 1 x 1.5 M.85 M' Rp 2,700.00
200 Kabel NYA 1 x 2.5 M.86 M' Rp 4,000.00
201 Kabel NYM 2 x 1.5 M.87 M' Rp 6,000.00
202 Kabel NYM 2 x 2.5 M.88 M' Rp 8,800.00
203 Kabel NYM 3 x 1.5 M.89 M' Rp 7,700.00
204 Kabel NYM 3 x 2.5 M.90 M' Rp 11,000.00
205 Kabel NYY 2 x 1.5 M.91 M' Rp 8,700.00
206 Kabel NYY 2 x 2.5 M' Rp 11,600.00
207 Kabel NYY 3 x 1.5 M.92 M' Rp 10,600.00
208 Kabel NYY 3 x 2.5 M.93 M' Rp 14,200.00
209 Kabel NYYGBY 4 x 25 M.94 M' Rp 160,000.00
210 Kabel NYYGBY 4 x 35 M.95 M' Rp 195,000.00
211 Kabel NYYHY 1 x 1,5 M.96 M' Rp 6,900.00
212 Kabel NYYHY 3 x 2,5 M.97 M' Rp 14,200.00
213 Kaca Cermin Tebal 5 mm M.98 M2 Rp 190,800.00
214 Kaca Darkblue 6 mm M.99 M2 Rp 150,000.00
215 Kaca Es M.100 M2 Rp 120,000.00
216 Kaca Film Sandblas M.101 M2 Rp 58,300.00
217 Kaca Polos 3 mm M.102 M2 Rp 85,000.00
218 Kaca Polos 5 mm M.103 M2 Rp 125,000.00
219 Kaca Polos Tebal 8 mm M.104 M2 Rp 210,000.00
220 Kaca Rayband 3 mm M.105 M2 Rp 90,000.00
221 Kaca Rayband 5 mm M.106 M2 Rp 127,200.00
222 Kaca Tempered Tebal 12 - 18 mm M.107 M2 Rp 742,000.00
223 Kaca Tempered Tebal 10 mm M.108 M2 Rp 636,000.00
224 Kaca Tempered Tebal 8 mm M.109 M2 Rp 455,800.00
225 Kanstin tipe tegak - horizontal M.110 Bh Rp 35,000.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
226 Kanstin tipe tegak - vertikal M.111 Bh Rp 55,000.00
227 Kanstin tipe miring M.112 Bh Rp 35,000.00
228 Kanstin tipe peninggi M.113 Bh Rp 27,000.00
229 Kanstin tipe penghubung Bh Rp 35,000.00
230 Kawat Beton M.114 Kg Rp 25,000.00
231 Kawat Duri M.115 M' Rp 22,000.00
232 Kawat Galvanis M.116 Kg Rp 22,500.00
233 Kawat Harmonika M.117 m' Rp 20,000.00
234 Kawat Bronjong M16 mm M Rp 20,000.00
235 Kawat Las M.118 Kotak Rp 137,500.00
236 Kayu M3 Rp 2,400,000.00
237 Kayu Bakar M.119 M3 Rp 150,000.00
238 Kayu Kelas I (Balok/Merbau Jambi) M.120 M3 Rp 17,500,000.00
239 Kayu Kelas I (Papan/Merbau Jambi) M.121 M3 Rp 17,500,000.00
240 Kayu Kelas II ( 2 x 3 Cm) M.122 M3 Rp 5,100,000.00
241 Kayu Kelas II ( 3 x 4 Cm) M.123 M3 Rp 4,500,000.00
242 Kayu Kelas II ( 5 x 7 cm) M.124 M3 Rp 4,000,000.00
243 Balok kayu kelas II M.125 M3 Rp 4,500,000.00
244 Kayu Kelas II (Papan) M.126 M3 Rp 5,000,000.00
245 Kayu Kelas III ( 2 x 3 cm) M.127 M3 Rp 3,400,000.00
246 Kayu Kelas III ( 5 x 7 cm) M.128 M3 Rp 3,200,000.00
247 Kayu Kelas III M.129 M3 Rp 3,200,000.00
248 Kayu papan kelas III M.130 M3 Rp 3,500,000.00
249 Kayu Kelas IV M.131 M3 Rp 3,200,000.00
250 Kayu (balok) Racuk M.132 M3 Rp 2,400,000.00
251 Kayu (papan) Racuk M.133 Rp 2,000,000.00
252 Kayu Perancah/Struktur M.134 M3 Rp 1,800,000.00
254 Keramik Granit Granit 20/20 Polos M.136 M2 Rp 115,000.00
255 Keramik Granit 20/20 Warna M.137 M2 Rp 130,000.00
256 Keramik Granit 20/25 Polos M.138 M2 tdk produksi lg
257 Keramik Granit 20/25 Warna M.139 M2 tdk produksi lg
258 Keramik Granit 30/30 Polos M.140 M2 Rp 120,000.00
259 Keramik Granit 30/30 Warna M.141 M2 Rp 130,000.00
260 Keramik Granit 30/60 Warna M.142 M2 Rp 200,000.00
261 Keramik Granit 40/40 Polos M.143 M2 Rp 115,000.00
262 Keramik Granit 40/40 Warna M.144 M2 Rp 125,000.00
263 Keramik Granit 50/50 Polos M.145 Buah Rp 32,500.00
264 Keramik Granit 50/50 Warna M.146 Buah Rp 36,250.00
265 Keramik Granit 60/60 Polos Unpolished M.147 Buah Rp 77,400.00
266 Keramik Granit 60/60 Warna Polished M.148 Buah Rp 80,000.00
267 Keramik Granit Anti Selip ( Kasar ) M.149 Buah Rp 73,000.00
268 Keramik Granit Border M.150 Buah Rp 12,000.00
269 Keramik Granit Kuku Macan M.151 m Rp 8,000.00
270 Keramik Trotoar 30/30 (Tegel Trotoar) M.152 Buah Rp 78,530.00
271 Plint Keramik Granit 10 x 20 cm M.153 Buah Rp 3,000.00
272 Plint Keramik Granit 10 x 30 cm Polos M.154 Buah Rp 3,700.00
273 Plint Keramik Granit 10 x 30 cm Warna M.155 Buah Rp 4,000.00
274 Plint Keramik Granit 10 x 40 cm Polos M.156 Buah Rp 5,000.00
275 Plint Keramik Granit 10 x 40 cm Warna M.157 Buah Rp 5,300.00
276 Plint Keramik Granit 10 x 50 cm Polos M.158 Buah Rp 8,500.00
277 Plint Keramik Granit 10 x 50 cm Warna M.159 Buah Rp 10,000.00
278 Plint Keramik Granit 10 x 60 cm Polos Unpolished M.160 Buah Rp 25,800.00
279 Plint Keramik Granit 10 x 60 cm Warna Polished M.161 Buah Rp 26,700.00
280 Kuas M.162 Buah Rp 30,000.00
281 Kuas roll M.163 Buah Rp 27,500.00
282 Kusen UPVC M.164 m Rp 250,000.00
283 Kusen UPVC List Fantasi /Variasi M.165 m' Rp 100,000.00
284 Kusen UPVC Pintu Kamar Mandi (70x190) M.166 Unit Rp 1,400,000.00
285 Kunci Tanam (Rumah Kunci + Handle) M.167 Set Rp 320,000.00
286 Lampu Downlight Inbow 3" silver M.168 Buah Rp 65,000.00
287 Lampu Downlight Inbow 4" silver M.169 Buah Rp 75,000.00
288 Lampu Downlight Outbow M.170 Buah Rp 150,000.00
289 Lampu SL 18 watt M.171 Buah Rp 30,000.00
290 Lampu LED 15 W M.172 Buah Rp 65,000.00
291 Lampu LED 10 W M.173 Buah Rp 45,000.00
292 Lampu LED 9 W M.174 Buah Rp 30,000.00
293 Lampu LED 7 W M.175 Buah Rp 28,000.00
294 Lampu LED 5 W M.176 Buah Rp 25,000.00
296 Lampu LED 3 W M.178 Buah Rp 18,000.00
297 Lampu TL 2 x 20 watt inbow LED M.179 Buah Rp 200,000.00
298 Lem Kayu M.180 Kg Rp 18,000.00
299 List Gipsum Per / M M.181 M' Rp 35,000.00
300 List Plafond Kayu M.182 M' Rp 25,000.00
301 Listplank GRC lebar 20 cm M.183 M' Rp 45,000.00
302 Minyak Cat (Tiner) M.184 Liter Rp 21,000.00
303 Minyak Fluks Liter Rp 22,000.00
304 Minyak Pelumas M.185 Liter Rp 34,000.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
306 Multiplek ( 122 x 244 ) 10 mm M.187 Lembar Rp 160,000.00
307 Multiplek ( 122 x 244 ) 12 mm M.188 Lembar Rp 195,000.00
308 Multiplek ( 122 x 244 ) 9 mm M.189 Lembar Rp 120,000.00
312 Paku M.193 Kg Rp 16,000.00
313 Paku 5 - 10 cm M.193 Kg Rp 16,000.00
314 Paku 1,5 - 3" M.194 Kg Rp 16,000.00
315 Paku 1/2 - 1" M.195 Kg Rp 20,000.00
316 Paku 4 - 6" M.196 Kg Rp 15,000.00
317 Paku Asbes M.197 Kg Rp 45,000.00
318 Paku Baja M.198 Buah Rp 55,000.00
319 Paku Beton M.199 Kotak Rp 45,000.00
320 Paku Seng M.200 Kg Rp 40,000.00
321 Paku skrup M.201 Kotak Rp 60,000.00
322 Paku Triplek M.202 Kg Rp 30,000.00
323 Pasir Beton (kg) Kg Rp 257.00
324 Pasir Beton M.203 M3 Rp 257,600.00
325 Pasir Pasang M.204 M3 Rp 255,400.00
326 Pasir Urug M.205 M3 Rp 242,900.00
327 Paving Block tebal 6 cm M.206 Buah Rp 2,700.00
328 Paving block 8 cm natural M.207 Buah Rp 3,250.00
329 Paving Block tebal 6 cm Warna M.208 Buah Rp 3,500.00
330 Paving Block tebal 8 cm Warna M.209 Buah Rp 4,000.00
331 Penangkal petir KURN R150 (Sudah Terpasang) M.210 Buah Rp 3,850,000.00
332 Pintu WC Fiber/PVC M.211 Buah Rp 252,000.00
333 Pipa Galvanis Medium 1 - 1/2 " x 3,20mm x 6M M.212 Batang Rp 550,000.00
334 Pipa Galvanis Medium 1 - 1/4 " x 3,20mm x 6M M.213 Batang Rp 450,000.00
335 Pipa Galvanis Medium 1 " x 3,20mm x 6M M.214 Batang Rp 400,000.00
336 Pipa Galvanis Medium 1/2 " x 2,60mm x 6M M.215 Batang Rp 200,000.00
337 Pipa Galvanis Medium 2 - 1/2 " x 3,60mm x 6M M.216 Batang Rp 995,000.00
338 Pipa Galvanis Medium 2 " x 3,60mm x 6M M.217 Batang Rp 800,000.00
339 Pipa Galvanis Medium 3 " x 3,2mm x 6M M.218 Batang Rp 1,345,000.00
340 Pipa Galvanis Medium 3/4 " x 3mm x 6M M.219 Batang Rp 250,000.00
341 Pipa Galvanis Medium 4 " x 4,50mm x 6M M.220 Batang Rp 1,680,000.00
342 Pipa Galvanis Medium 5 " x 4,5mm x 6M M.221 Batang Rp 2,220,000.00
357 Pipa Hitam Medium 1 - 1/2 " x 3mm x 6M M.236 Batang Rp 300,000.00
358 Pipa Hitam Medium 1 - 1/4 " x 3mm x 6M M.237 Batang Rp 280,000.00
359 Pipa Hitam Medium 1 " x 3mm x 6M M.238 Batang Rp 220,000.00
360 Pipa Hitam Medium 1/2 " x 2,3mm x 6M M.239 Batang Rp 125,000.00
361 Pipa Hitam Medium 2 - 1/2 " x 3mm x 6M M.240 Batang Rp 550,000.00
362 Pipa Hitam Medium 2 " x 2,1 mm x 6M M.241 Batang Rp 425,000.00
363 Pipa Hitam Medium 3 " x 4 mm x 6M M.242 Batang Rp 700,000.00
364 Pipa Hitam Medium 3/4 " x 2mm x 6M M.243 Batang Rp 160,000.00
365 Pipa Hitam Medium 4 " x 1,8 mm x 6M M.244 Batang Rp 1,175,000.00
366 Pipa Hitam Medium 4 " x 4,50 mm x 6M M.245 Batang Rp 1,175,000.00
367 Pipa Hitam Medium 5 " x 4,85 mm x 6M M.246 Batang Rp 1,350,000.00
368 Pipa Hitam Medium 6 " x 4,85mm x 6M M.247 Batang Rp 2,300,000.00
369 Pipa Hitam Medium 8 " x 4,5mm x 6M M.248 Batang Rp 2,650,000.00
370 Pipa Hitam SCH 40 1 - 1/2 " x 3,2mm x 6M M.249 Batang Rp 475,000.00
371 Pipa Hitam SCH 40 1 - 1/4 " x 3,2mm x 6M M.250 Batang Rp 425,000.00
372 Pipa Hitam SCH 40 1 " x 3,2mm x 6M M.251 Batang Rp 330,000.00
373 Pipa Hitam SCH 40 1/2 " x 2,8mm x 6M M.252 Batang Rp 180,000.00
374 Pipa Hitam SCH 40 2 - 1/2 " x 3,6 mm x 6M M.253 Batang Rp 925,000.00
375 Pipa Hitam SCH 40 2 " x 3,6mm x 6M M.254 Batang Rp 630,000.00
376 Pipa Hitam SCH 40 3 " x 4 mm x 6M M.255 Batang Rp 1,225,000.00
377 Pipa Hitam SCH 40 3/4 " x 2,6mm x 6M M.256 Batang Rp 210,000.00
378 Pipa Hitam SCH 40 4 " x 4,5mm x 6M M.257 Batang Rp 1,600,000.00
379 Pipa Hitam SCH 40 5 " x 4,85mm x 6M M.258 Batang Rp 2,110,000.00
380 Pipa Hitam SCH 40 6 " x 4,85mm x 6M M.259 Batang Rp 2,810,000.00
381 Pipa Hitam SCH 40 8 " x 5 mm x 6M M.260 Batang Rp 4,050,000.00
382 Pipa PVC Berlubang 4" M.261 M Rp 72,500.00
383 PVC 4 m diameter 0,5" M.262 Batang Rp 23,300.00
384 PVC 4 m diameter 0,75" M.263 Batang Rp 31,700.00
385 PVC 4 m diameter 1" M.264 Batang Rp 43,300.00
386 PVC 4 m diameter 1,5" M.265 Batang Rp 74,400.00
387 PVC 4 m diameter 2" M.266 Batang Rp 88,000.00
388 PVC 4 m diameter 2,5" M.267 Batang Rp 128,000.00
389 PVC 4 m diameter 3" M.268 Batang Rp 251,000.00
390 PVC 4 m diameter 4" M.269 Batang Rp 291,500.00
391 PVC 4 m diameter 5" M.270 Batang Rp 450,000.00
392 PVC 4 m diameter 6 " M.271 Batang Rp 875,000.00
394 Plamir Kayu M.273 Liter Rp 50,000.00
395 Plamir M.274 Kg Rp 17,500.00
396 Plat Bordes / Spandek 2,3mm x 4’ x 8’ M.275 Lembar Rp 700,000.00
397 Plat Bordes / Spandek3,2mm x 4’ x 8’ M.276 Lembar Rp 1,050,000.00
398 Plat Bordes / Spandek3mm x 4’ x 8’ M.277 Lembar Rp 975,000.00
414 Plat Strip M.293 Kg Rp 12,000.00
417 Plafond PVC Polos M.296 M2 Rp 250,000.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
418 Plafond PVC Motif M.297 M2 Rp 350,000.00
419 Plafond PVC List 1,5 cm M.298 M' Rp 18,000.00
420 Plafond PVC List 5 cm M.299 M' Rp 55,000.00
421 Plafond PVC List 8 cm M.300 M' Rp 70,000.00
424 Politur M.303 Kg Rp 30,000.00
425 Politur Jadi M.304 Kg Rp 58,000.00
426 Polycarbonate roofing sheet 5 ml (10-15 th) M.305 m2 Rp 120,000.00
427 Polycarbonate roofing sheet 6 ml (10-15 th) M.306 m2 Rp 160,000.00
428 Polycarbonate roofing sheet 10 ml (10-15 th) M.307 m2 Rp 190,000.00
429 Pompa sub marsible 1 Pk M.308 Buah Rp 8,800,000.00
430 Pompa sub marsible 3/4 Pk M.309 Buah Rp 8,500,000.00
431 Pompa sub marsible 2 Pk M.310 Buah Rp 12,500,000.00
433 Profil baja ringan reng R32 M.312 Batang Rp 47,700.00
434 Profil baja ringan reng R40 M.313 Batang Rp 61,900.00
439 Profil baja ringan C.65 M.318 Batang Rp 86,000.00
440 Profil baja ringan C.75 M.319 Batang Rp 96,000.00
443 Talang Juray M.322 Batang Rp 202,000.00
444 Guard Rail M.323 Bh Rp 1,834,000.00
445 End Block M.324 Bh Rp 425,000.00
446 Post M.325 Bh Rp 833,100.00
447 Steel Block M.326 Bh Rp 173,500.00
448 Mur Baut Guard Rail M.327 Bh Rp 11,000.00
449 Mur Baut Hexagon M.328 Bh Rp 6,500.00
450 Guard Rail Reflector M.329 Bh Rp 27,500.00
451 Rolling Door Almunium M.330 M2 Rp 516,000.00
452 Rolling Door Besi M.331 M2 Rp 354,000.00
453 Rolling Door Perforated 20 cm M.332 M2 Rp 620,000.00
454 Rolling Door Perforated 80 cm M.333 M2 Rp 660,000.00
455 Rolling Door Perforated Full M.334 M2 Rp 780,000.00
456 Roster Beton M.335 Buah Rp 25,000.00
457 Reducer PVC diameter 6" M.336 Buah Rp 35,000.00
458 Saklar ganda M.337 Buah Rp 36,000.00
459 Saklar Triple M.338 Buah Rp 40,000.00
460 Saklar tunggal Buah Rp 19,000.00
461 Sand Bag ( 50 Kg ) M.339 Buah Rp 3,500.00
462 Sealtape Listrik M.340 Buah Rp 3,500.00
466 Semen M.342 Kg Rp 1,200.00
467 Semen Putih/Nat M.343 Kg Rp 3,500.00
468 Semen Warna M.344 Kg Rp 3,500.00
469 Semen Anti Karat (M215) M.345 Kg Rp 5,600.00
470 Seng Gelombang BJLS 27 M.346 Lembar Rp 65,000.00
471 Seng Gelombang BJLS 30 M.347 Lembar Rp 50,000.00
472 Seng Gelombang Fiber M.348 Lembar Rp 85,000.00
473 Seng Plat Alumunium M.349 Lembar Rp 61,000.00
477 Sel tape M.353 Buah Rp 4,000.00
478 Septic Tank Biotech (IPAL Komunal) Kap. 2 m3 M.354 Buah Rp 14,500,000.00
479 Septic Tank Biotech (IPAL Komunal) Kap. 6 m3 M.355 Buah Rp 30,000,000.00
480 Septic Tank Biotech (IPAL Komunal) Kap. 15 m3 M.356 Buah Rp 78,000,000.00
481 Sirtu M3 Rp 260,000.00
482 Solar M.357 Liter Rp 9,600.00
483 Sok PVC diameter 1,5" M.358 Buah Rp 16,500.00
484 Shok drat Luar PVC diameter 1,5 " M.359 Buah Rp 12,000.00
485 Shok drat Dalam PVC diameter 1,5 " M.360 Buah Rp 17,000.00
486 Spandek 0,30 mm M.361 m2 Rp 67,100.00
487 Spandek warna L 1m t =0,30 mm M.362 m2 Rp 130,000.00
488 Spandek warna L 1m t =0,40 mm M.363 m2 Rp 158,000.00
489 Spandek warna L 1m t =0,35 mm M.364 m2 Rp 58,000.00
490 Spandek warna L 80 m t =0,35 mm M.365 m2 Rp 56,000.00
491 Spandek warna L 80m x 180 lbr M.366 kodi Rp 768,000.00
492 Spandek Fiber M.367 m2 Rp 960,000.00
493 Spandekk UPVC Biasa M.368 M2 Rp 185,000.00
494 Spandekk UPVC Transparan M.369 M2 Rp 190,000.00
495 Stop kontak M.370 Buah Rp 34,000.00
496 Stop Kran diameter 1,5 " M.371 Buah Rp 200,000.00
497 Tali Tambang Nilon M.372 m' Rp 4,000.00
498 Tanah Urug Pilihan M.373 m3 Rp 75,000.00
499 Tanah Urug Biasa M.374 M3 Rp 40,000.00
500 Tarikan Jendela Buah Rp 25,000.00
502 Tempat Sabun Keramik Granit M.375 Buah Rp 35,000.00
505 Tower Air Fiber 1 m3 M.378 Buah Rp 2,250,000.00
506 Tower Air Fiber 2 m3 M.379 Buah Rp 4,000,000.00
507 Tower Air Fiber 3 m3 M.380 Buah Rp 5,290,000.00
508 Tower Air Fiber 5 m3 M.381 Buah Rp 8,395,000.00
509 Tower Air Stainless Steel 1 m3 M.382 Buah Rp 3,300,000.00
510 Tower Air Stainless Steel 2 m3 M.383 Buah Rp 4,200,000.00
511 Tower Air Stainless Steel 3 m3 M.384 Buah Rp 9,600,000.00
512 Tower Air Stainless Steel 5 m3 M.385 Buah Rp 15,700,000.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
513 Triplek 3 mm M.386 Lembar Rp 60,000.00
514 Triplek 4 mm M.387 Lembar Rp 75,000.00
515 Triplek 6 mm M.388 Lembar Rp 82,000.00
518 M.391 Set Rp 2,670,000.00
519 U Ditch 400 x 400, L = 1,2 m M.392 Buah Rp 1,158,454.00
520 U Ditch 500 x 500, L = 1,2 m M.393 Buah Rp 1,697,872.00
521 U Ditch 600 x 600, L = 1,2 m M.394 Buah Rp 2,237,532.00
522 U Ditch 800 x 800, L = 1,2 m M.395 Buah Rp 3,212,792.00
523 U Ditch 1000 x 1000, L = 1,2 m M.396 Buah Rp 5,070,384.00
524 wallpaper lebar 50 cm M.397 M2 Rp 50,000.00
525 Wastafel (lengkap) M.398 set Rp 1,800,000.00
526 Kitchen Zink M.399 set Rp 1,100,000.00
527 Kerikil (kg) M.400 Kg Rp 397.00
528 Minyak bekisting M.401 Rp 15,000.00
529 Jaring kawat baja dilas M.402 Rp 13,750.00
530 Plywood 120x240 tbl. 9 mm M.403 lbr Rp 102,000.00
531 Bahan tambahan kimia M.404 Liter Rp 52,000.00
532 Kapur M.405 Rp 200,000.00
533 koral beton M.406 Rp 235,990.00
534 Seng Gelombang 3" x 6" BJLS 28 M.407 Rp 56,500.00
535 Plywood 120x240 tbl. 4 mm M.408 lbr Rp 72,000.00
536 kaso 5/7 M.409 Rp 2,499,000.00
537 Paku Biasa 2" - 5" M.410 kg Rp 26,750.00
538 meni Besi M.411 Rp 31,800.00
539 Batu pecah M.412 m3 Rp 381,500.00
540 seng plat M.413 Rp 40,000.00
541 Cat dasar Tembok M.414 kg Rp 115,000.00
542 Cat Penutup Tembok M.415 kg Rp 115,000.00
543 Kansteen 60x14x30 cm M.416 bh Rp 70,000.00
544 Kerikil M.417 m3 Rp 350,000.00
545 keramik ukuran 30cm x 30cm M.418 bh Rp 11,000.00
546 phenol film tebal 12 mm lbr Rp 195,000.00
547 Besi Hollow (50 x 50 x 3) mm kg Rp 18,040.00
548 Dynabol dia 12 x 120 mm bh Rp 6,300.00
549 mobile crane UH Rp 1,102,500.00
550 skafolding UH Rp 27,500.00
551 operator crane o/h Rp 150,000.00
552 pipe support UH Rp 342,400.00
553 semen grout kg Rp 1,640.00
554 screening kg Rp 2,650.00
Pekerja penganyam L.2 oh Rp 160,800.00
Pekerja pengisi batu L.3 oh Rp 160,800.00
Teknisi sampling kualitas air L.4 oh Rp 160,800.00
Buruh Kasar L.5 oh Rp 157,700.00
Tukang Atap L.6 oh Rp 120,000.00
Tukang batu L.7 oh Rp 120,000.00
Tukang Besi L.8 oh Rp 120,000.00
Tukang Besi Konstruksi L.9 oh Rp 120,000.00
Tukang cat L.10 oh Rp 120,000.00
Tukang ereksi L.11 oh Rp 120,000.00
Tukang Pancang L.12 oh Rp 120,000.00
Tukang Kayu/Bekisting L.13 oh Rp 120,000.00
Tukang gambar L.14 oh Rp 120,000.00
Tukang Interior L.15 oh Rp 120,000.00
Tukang Kayu L.16 oh Rp 120,000.00
Tukang Las L.17 oh Rp 120,000.00
Tukang Las Konstruksi L.18 oh Rp 120,000.00
Tukang Listrik L.19 oh Rp 120,000.00
Tukang Alumunium L.20 oh Rp 120,000.00
Tukang Pipa L.21 oh Rp 120,000.00
Tukang Plafon L.22 oh Rp 120,000.00
Tukang Prodo L.23 oh Rp 120,000.00
Tukang Ukir L.24 oh Rp 120,000.00
Tukang vibrator L.25 oh Rp 120,000.00
Tukang Bor L.26 oh Rp 120,000.00
Tukang cat dan tulis *) L.27 oh Rp 120,000.00
Tukang Jahit L.28 oh Rp 120,000.00
Tukang Las biasa L.29 oh Rp 120,000.00
Tukang Las Listrik L.30 oh Rp 120,000.00
Tukang penganyam L.31 oh Rp 120,000.00
Tukang Gali L.32 oh Rp 120,000.00
Tukang gali sumur L.32 oh Rp 120,000.00
LEADER
Direktur Kontraktor (Pemberi Tugas) L.33 oh Rp 378,400.00
Supervisor (Staf Kontraktor) L.34 oh Rp 315,300.00
Mandor L.35 oh Rp 150,000.00
Kepala Tukang L.36 oh Rp 140,000.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
OPERATOR
Operator alat berat L.37 oh Rp 140,000.00
Operator Alat Pipa L.38 oh Rp 140,000.00
Operator crane L.39 oh Rp 140,000.00
Supir truck L.40 oh Rp 120,000.00
Supir kendaraan < 2 ton (termasuk sedan) L.41 oh Rp 120,000.00
Kenek L.42 oh Rp 100,000.00
Pembantu operator crane L.43 oh Rp 120,000.00
Operator Alat Pipa Ahli L.44 oh Rp 140,000.00
Pembantu Operator Alat Pipa L.45 oh Rp 120,000.00
Operator Alat Elektronik L.46 oh Rp 140,000.00
Operator Pompa L.47 oh Rp 140,000.00
Operator printer L.48 oh Rp 140,000.00
Operator Tripod/Crane *) L.49 oh Rp 140,000.00
Operator, driver speedboat L.50 oh Rp 140,000.00
TENAGA AHLI
Ahli madya (sipil/hidrologi) L.51 oh Rp 283,800.00
Ahli madya geologist L.52 oh Rp 283,800.00
Engineer (sipil/geologi)/ahli madya L.53 oh Rp 283,800.00
Ahli Alat Berat L.54 oh Rp 283,800.00
Ahli K3 L.55 oh Rp 283,800.00
Dokter L.56 oh Rp 283,800.00
Perawat L.57 oh Rp 283,800.00
Juru Ukur L.58 oh Rp 283,800.00
Asisten Ahli Ukur L.59 oh Rp 236,500.00
LAINNYA
Penjaga malam/Satpam L.60 oh Rp 157,700.00
Tukang gambar Drafter L.61 oh Rp 236,500.00
Desain Engineer L.62 oh Rp 315,300.00
Operator komputer/printer/ploter L.63 oh Rp 157,700.00
KELOMPOK AIR, TANAH, BATU DAN SEMEN
Air M.1 Ltr Rp 103.00
Air test (air bersih) M.2 m3 Rp 49,500.00
Alang-alang M.3 Ikat Rp 590.00
Alkasit M.4 kg Rp 56,700.00
Bata ringan tebal 7,5 cm M.5 m3 Rp 3,405,930.00
Bata berongga M.6 bh Rp 1,640.00
Bata merah M.7 Bh Rp 1,020.00
Bata pelapis Dinding 3cm x 7cm x 24cm M.8 Bh Rp 900.00
Bata rooster M.9 bh Rp 840.00
Batako M.10 bh Rp 4,780.00
Batu alam / tempel M.11 m2 Rp 316,250.00
Batu apung M.12 kg Rp 33,810.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
Batu belah M.13 m3 Rp 305,250.00
Batu granit M.14 Kg Rp 15,300.00
Batu paras M.15 m2 Rp 98,400.00
Batu paras Dinding M.16 Bh Rp 78,400.00
Batu pecah 2/3 M.17 m3 Rp 353,500.00
Batu teraso M.18 Kg Rp 2,330.00
Ijuk M.19 m3 Rp 216,300.00
Kapur M.20 m3 Rp 360,570.00
Kapur padam M.21 m3 Rp 97,120.00
Kapur Pasang M.22 m3 Rp 514,500.00
Kapur sirih M.23 Kg Rp 14,520.00
Kerikil M.24 m3 Rp 253,800.00
Kerikil (kg) M.25 kg Rp 190.00
Koral beton M.26 m3 Rp 235,990.00
Mortar siap pakai M.27 Kg Rp 11,550.00
Pasir beton M.28 m3 Rp 257,000.00
Pasir Beton (kg) M.29 kg Rp 280.00
Pasir pasang M.30 m3 Rp 239,080.00
Pasir Silika M.31 Kg Rp 2,480.00
Pasir urug M.32 M3 Rp 239,370.00
Semen M.33 Kg Rp 1,500.00
Semen grout M.34 Kg Rp 2,000.00
Semen nat M.35 Kg Rp 10,440.00
Semen Warna M.36 Kg Rp 2,360.00
Sirtu M.37 m3 Rp 289,190.00
Tanah Liat M.38 m3 Rp 128,440.00
Tanah urug M.39 m3 Rp 190,550.00
Tepung gypsum M.40 kg Rp 3,930.00
KELOMPOK KAYU
Bambu Ø 6 - 8 / 600 cm M.41 btg Rp 18,540.00
Dolken kayu Ø 8-10/400 cm M.42 btg Rp 23,750.00
List kayu 2/4 M.43 m3 Rp 6,765,000.00
List kayu profil M.44 m Rp 3,590.00
Plepet kayu M.45 m1 Rp 2,400.00
Kayu cetakan M.46 m2 Rp 169,500.00
Kelompok Kayu Reng
Reng 2 x 3 cm Kayu Kelas II M.47 m3 Rp 3,840,000.00
Reng bengkirai 2/3 M.48 m1 Rp 4,860.00
Reng bengkirai 3/4 M.49 m1 Rp 11,340.00
Reng jati (lokal) 2/3 M.50 m1 Rp 5,710.00
Reng jati (lokal) 3/4 M.51 m1 Rp 14,380.00
Reng jati 3/4 (klas 1) M.52 m1 Rp 17,320.00
Reng kamper 2/3 M.53 m1 Rp 4,640.00
Reng kamper 3/4 M.54 m1 Rp 8,200.00
Reng kruing 2/3 M.55 m1 Rp 3,760.00
Reng kruing 3/4 M.56 m1 Rp 8,850.00
Kelompok Kayu Kaso
Kaso 5/7 Kelas II M.57 m3 Rp 3,605,000.00
Kaso 5/7 ( albasiah/meranti ) M.58 m3 Rp 4,375,000.00
Kaso-kaso (5 x 7) cm bengkirai M.59 m3 Rp 7,625,000.00
Kaso-kaso (5 x 7) cm jati lokal M.60 m3 Rp 11,877,000.00
Kaso-kaso (5 x 7) cm kamper M.61 m3 Rp 6,474,000.00
Kaso-kaso (5 x 7) cm kruing M.62 m3 Rp 5,445,000.00
Kayu Kaso 5 / 7 (borneo) M.63 btg Rp 48,510.00
Kayu Kaso 5 / 7 (borneo/meranti) M.64 m3 Rp 4,305,000.00
Kayu kruing 5/7 M.65 m3 Rp 4,995,000.00
Usuk kayu bengkirai 5/7 M.66 m1 Rp 24,800.00
Usuk kayu jati (lokal) 5/7 M.67 m1 Rp 34,580.00
Usuk kayu jati 5/7 (klas 1) M.68 m1 Rp 47,100.00
Usuk kayu kamper 5/7 M.69 m1 Rp 22,530.00
Usuk kayu kruing 5/7 M.70 m1 Rp 15,750.00
Usuk Kayu meranti 5/7 Kelas III M.71 m3 Rp 2,850,000.00
Kelompok Kayu Balok
Balok kayu 8/15 Kelas I M.72 m3 Rp 7,650,000.00
Balok kayu bengkirai M.73 m3 Rp 7,187,500.00
Balok Kayu Borneo M.74 m3 Rp 3,990,000.00
Balok kayu jati (klas plitur) M.75 m3 Rp 12,987,000.00
Balok kayu jati (lokal) M.76 m3 Rp 11,193,000.00
Balok kayu kamper M.77 m3 Rp 5,913,750.00
Balok kayu kelas II M.78 m3 Rp 3,500,000.00
Balok kayu kruing M.79 m3 Rp 5,400,000.00
Balok kayu papan (klas plitur) M.80 m3 Rp 7,670,000.00
Balok kayu, 6 x 12 M.81 m3 Rp 5,220,000.00
Kayu balok 5/7 Kelas II M.82 m3 Rp 2,875,000.00
Kayu balok 5/7 kelas III M.83 m3 Rp 2,499,000.00
Kayu balok borneo M.84 M3 Rp 4,305,000.00
Kayu bengkirai balok M.85 m3 Rp 7,125,000.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
Kayu glugu balok M.86 m3 Rp 1,792,000.00
Kayu jati (klas plitur) balok M.87 m3 Rp 10,830,000.00
Kayu jati (lokal) balok M.88 m3 Rp 7,200,000.00
Kayu kamper balok M.89 m3 Rp 6,411,750.00
Kayu kelas II balok M.90 M3 Rp 3,720,000.00
Kayu kruing balok M.91 m3 Rp 5,670,000.00
Kelompok Kayu Papan
Kayu bengkirai papan M.92 m3 Rp 7,562,500.00
Kayu jati (lokal) papan M.93 m3 Rp 7,562,500.00
Kayu jati papan M.94 m3 Rp 11,400,000.00
Kayu jati papan (klas 1) M.95 m3 Rp 12,765,000.00
Kayu kamper papan M.96 m3 Rp 7,532,250.00
Kayu papan kelas III (papan) M.97 m3 Rp 2,800,000.00
Kayu kruing papan M.98 m3 Rp 4,455,000.00
Kayu Papan 3 / 20 borneo/meranti M.99 m3 Rp 3,745,000.00
Kayu papan 3/20 M.100 m3 Rp 3,605,000.00
Kayu Papan kelas I M.101 M3 Rp 7,158,750.00
Kayu Papan kelas II M.102 m3 Rp 4,375,000.00
Kayu papan kelas III M.103 m3 Rp 2,700,000.00
Papan cetakan M.104 m3 Rp 1,584,000.00
Papan kayu 3/20 Kelas II M.105 m3 Rp 3,282,500.00
Papan kayu 3/20 Kelas III M.106 m3 Rp 1,710,000.00
Papan kayu bengkirai M.107 m3 Rp 6,875,000.00
Papan Kayu Borneo tebal 3cm M.108 m3 Rp 3,815,000.00
Papan kayu jati (klas plitur) M.109 m3 Rp 9,025,000.00
Papan kayu jati (lokal) M.110 m3 Rp 9,785,000.00
Papan kayu kamper M.111 m3 Rp 6,100,500.00
Papan kayu kelas II M.112 m3 Rp 3,885,000.00
Papan kayu kruing M.113 m3 Rp 4,905,000.00
Kelompok Kayu Ram
Ram kayu bengkirai M.114 m3 Rp 5,985,000.00
Ram kayu jati (lokal) M.115 m3 Rp 7,500,000.00
Ram kayu kamper M.116 m3 Rp 5,852,000.00
Ram kayu kruing M.117 m3 Rp 3,640,000.00
KELOMPOK BESI DAN ALUMINIUM
Alluminium B M.118 Kg Rp 29,760.00
Alluminium C M.119 Kg Rp 24,580.00
Aluminium Composite Panel M.120 Lbr Rp 372,690.00
Alumunium foil M.121 M2 Rp 37,080.00
Aluminium strip M.122 m Rp 25,600.00
Alumunium gel tbl 0,55 M.123 Lbr Rp 182,700.00
Baja Ringan- Reng Truss M.124 M' Rp 8,820.00
Baja Ringan-C Truss M.125 m1 Rp 14,700.00
Baja Siku M.126 Kg Rp 16,440.00
Baja WF M.127 Kg Rp 18,870.00
Baja strip (0,2 x 2) cm M.128 Kg Rp 14,000.00
Baut (Srew driver) M.129 bh Rp 490.00
Ramset M.130 bh Rp 4,750.00
Besi angkur Ø=8 mm M.131 Kg Rp 13,310.00
Besi beton M.132 Kg Rp 15,000.00
Besi hollow 50.50.3 M.133 Kg Rp 19,380.00
Besi IWF M.134 Kg Rp 8,510.00
Besi lis kaca (1 x 1) cm M.135 m Rp 43,650.00
Besi plat baja M.136 Kg Rp 10,200.00
Besi Profil M.137 Kg Rp 18,100.00
Besi rangka M.138 kg Rp 1,540.00
Besi siku L 30.30.3 M.139 Kg Rp 14,340.00
Besi square tube M.140 m Rp 33,130.00
Hollow 4/4 M.141 M1 Rp 10,400.00
Kait angin M.142 Bh Rp 5,670.00
Kawat beton M.143 Kg Rp 23,030.00
Kawat burung M.144 m2 Rp 14,730.00
Kawat dia 4 mm M.145 kg Rp 38,640.00
Kawat duri M.146 M’ Rp 25,000.00
Kawat harmonika M.147 m2 Rp 40,740.00
Kawat jaring M.148 Lbr Rp 136,400.00
Kawat kassa M.149 m2 Rp 12,840.00
Kawat las listrik M.150 Kg Rp 55,350.00
Kawat las gas M.151 Kg Rp 45,450.00
Kawat nyamuk M.152 m2 Rp 12,480.00
Kawat penggantung M.153 m1 Rp 590.00
Pagar kawat jaring M.154 lbr Rp 42,350.00
Paku 5 - 10 cm M.155 kg Rp 24,440.00
Paku anti karat M.156 kg Rp 21,940.00
Paku Biasa ½" - 1" M.157 Kg Rp 24,440.00
Paku Biasa 2" - 5" M.158 Kg Rp 26,750.00
Paku eternit M.159 kg Rp 20,480.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
Paku gypsum M.160 kg Rp 19,430.00
Paku Hak Panjang 15cm M.161 Kg Rp 11,330.00
Paku pancing 6x23 M.162 Kg Rp 14,280.00
Paku plepet M.163 kg Rp 20,300.00
Paku reng M.164 kg Rp 17,160.00
Paku sekrup M.165 bh Rp 910.00
Paku sekrup 3,5" M.166 Kg Rp 15,120.00
Paku skrup 1 cm – 2,5 cm M.167 bh Rp 630.00
Paku skrup 10 cm M.168 kg Rp 17,500.00
Paku skrup 5 cm M.169 kg Rp 16,830.00
Paku sumbat M.170 bh Rp 420.00
Paku tripleks M.171 kg Rp 19,260.00
Paku usuk M.172 kg Rp 15,200.00
Paku/skrup atap anti karat M.173 bh Rp 1,070.00
Pintu alluminium M.174 m Rp 468,000.00
Pintu alumunium M.175 m2 Rp 249,930.00
Pintu gulung besi M.176 m2 Rp 588,500.00
Profil Allum"T" M.177 m Rp 14,520.00
Profil kusen alluminium M.178 m1 Rp 136,800.00
Rel pintu dorong M.179 Set Rp 198,000.00
Rolling dor alluminium M.180 m2 Rp 566,800.00
Screening M.181 Kg Rp 2,450.00
Screw M.182 bh Rp 550.00
Sekrup fixer M.183 bh Rp 270.00
Sunscreen alluminium M.184 m2 Rp 277,500.00
KELOMPOK PIPA, SANITASI DAN ACCESORIS
Bak cuci piring M.185 Unit Rp 494,500.00
Bak fiberglass M.186 Unit Rp 342,400.00
Bak mandi teraso M.187 bh Rp 184,140.00
Bathcuip M.188 Unit Rp 3,190,000.00
Floor drain M.189 Unit Rp 75,000.00
Klem Pipa M.190 bh Rp 1,770.00
Kloset duduk / monoblock M.191 Unit Rp 2,450,000.00
Kloset jongkok porselen M.192 bh Rp 160,500.00
Kloset jongkok teraso M.193 Unit Rp 247,500.00
Kran air M.194 M Rp 24,750.00
L.Bow M.195 bh Rp 9,800.00
Pipa Beton M.196 Bh Rp 61,050.00
Pipa Conduit M.197 M' Rp 5,980.00
Pipa tanah M.198 Bh Rp 56,270.00
Socket Pipa M.199 bh Rp 13,440.00
Urinoir M.200 Unit Rp 1,736,000.00
Wastafel M.201 Unit Rp 1,479,000.00
Waterdrain M.202 Bh Rp 85,120.00
Pipa PVC 1/2” M.203 M Rp 4,200.00
Pipa PVC 3/4” M.204 M Rp 5,230.00
Pipa PVC 1” M.205 M Rp 6,060.00
Pipa PVC 11/2” M.206 M Rp 7,090.00
Pipa PVC 2” M.207 M Rp 8,610.00
Pipa PVC 21/2” M.208 M Rp 9,300.00
Pipa PVC 3" M.209 m1 Rp 8,320.00
Pipa PVC 3” M.210 M Rp 9,860.00
Pipa PVC 4” M.211 M Rp 9,990.00
Pipa galvanis ½” M.212 M Rp 20,580.00
Pipa galvanis 3/4” M.213 M Rp 31,720.00
Pipa galvanis 1” M.214 M Rp 45,200.00
Pipa galvanis 11/2” M.215 M Rp 95,000.00
Pipa galvanis 3” M.216 M Rp 119,000.00
Pipa galvanis 4” M.217 M Rp 128,640.00
Pipa Baja Ø 63 mm M.218 m Rp 254,170.00
Pipa Baja Ø 100 mm M.219 m Rp 367,500.00
Pipa Baja Ø 125 mm M.220 m Rp 220,840.00
Pipa Baja Ø 150 mm M.221 m Rp 128,960.00
Pipa Baja Ø 200 mm M.222 m Rp 235,400.00
Pipa Baja Ø 250 mm M.223 m Rp 306,540.00
Pipa Baja Ø 300 mm M.224 m Rp 330,750.00
Pipa Baja Ø 400 mm M.225 m Rp 487,200.00
Pipa Baja Ø 450 mm M.226 m Rp 453,120.00
Pipa Baja Ø 500 mm M.227 m Rp 593,250.00
Pipa Baja Ø 600 mm M.228 m Rp 787,400.00
Pipa Baja Ø 800 mm M.229 m Rp 1,033,200.00
Pipa Baja Ø 900 mm M.230 m Rp 1,039,500.00
Pipa Baja Ø 1000 mm M.231 m Rp 1,356,000.00
Pipa Baja Ø 1100 mm M.232 m Rp 1,287,500.00
Pipa Baja Ø 1200 mm M.233 m Rp 1,261,000.00
Pipa DCI Ø 100 mm M.234 m Rp 167,140.00
Pipa DCI Ø 125 mm M.235 m Rp 192,000.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
Pipa DCI Ø 150 mm M.236 m Rp 386,250.00
Pipa DCI Ø 200 mm M.237 M Rp 539,000.00
Pipa DCI Ø 250 mm M.238 M Rp 928,800.00
Pipa DCI Ø 300 mm M.239 m Rp 1,323,000.00
Pipa DCI Ø 400 mm M.240 m Rp 2,664,000.00
Pipa DCI Ø 450 mm M.241 m Rp 2,884,000.00
Pipa DCI Ø 500 mm M.242 m Rp 3,264,000.00
Pipa DCI Ø 600 mm M.243 m Rp 3,420,000.00
Pipa DCI Ø 800 mm M.244 m Rp 5,472,000.00
Pipa DCI Ø 900 mm M.245 m Rp 5,457,000.00
Pipa DCI Ø 1000 mm M.246 m Rp 7,140,000.00
Pipa DCI Ø 1100 mm M.247 m Rp 6,565,000.00
Pipa DCI Ø 1200 mm M.248 m Rp 7,154,000.00
Pipa GIP Ø 63 mm M.249 m Rp 168,000.00
Pipa GIP Ø 100 mm M.250 m Rp 247,470.00
Pipa GIP Ø 125 mm M.251 m Rp 292,170.00
Pipa GIP Ø 150 mm M.252 m Rp 360,520.00
Pipa GIP Ø 200 mm M.253 m Rp 551,250.00
Pipa GIP Ø 250 mm M.254 m Rp 667,020.00
Pipa GIP Ø 300 mm M.255 m Rp 727,650.00
Pipa GIP Ø 400 mm M.256 m Rp 873,180.00
Pipa GIP Ø 450 mm M.257 m Rp 962,490.00
Pipa GIP Ø 500 mm M.258 m Rp 1,223,780.00
Pipa GIP Ø 600 mm M.259 m Rp 1,455,300.00
Pipa GIP Ø 800 mm M.260 m Rp 1,711,080.00
Pipa GIP Ø 900 mm M.261 m Rp 2,440,940.00
Pipa GIP Ø 1000 mm M.262 m Rp 2,138,850.00
Pipa GIP Ø 1100 mm M.263 m Rp 2,571,030.00
Pipa GIP Ø 1200 mm M.264 m Rp 3,254,580.00
Pipa HDPE Ø 63 mm M.265 m Rp 58,850.00
Pipa HDPE Ø 100 mm M.266 m Rp 147,560.00
Pipa HDPE Ø 125 mm M.267 m Rp 297,500.00
Pipa HDPE Ø 150 mm M.268 m Rp 352,240.00
Pipa HDPE Ø 200 mm M.269 m Rp 631,280.00
Pipa HDPE Ø 250 mm M.270 m Rp 993,300.00
Pipa HDPE Ø 300 mm M.271 m Rp 1,672,000.00
Pipa HDPE Ø 400 mm M.272 m Rp 3,046,680.00
Pipa HDPE Ø 450 mm M.273 m Rp 3,338,670.00
Pipa HDPE Ø 500 mm M.274 m Rp 3,959,000.00
Pipa HDPE Ø 600 mm M.275 bh Rp 5,880,000.00
Pipa HDPE Ø 800 mm M.276 m Rp 10,614,000.00
Pipa HDPE Ø 900 mm M.277 m Rp 11,956,000.00
Pipa HDPE Ø 1000 M.278 bh Rp 10,815,000.00
Pipa HDPE Ø 1000 mm M.279 m Rp 14,145,000.00
Pipa HDPE Ø 1100 M.280 bh Rp 10,395,000.00
Pipa HDPE Ø 1100 mm M.281 m Rp 14,030,000.00
Pipa HDPE Ø 1200 mm M.282 m Rp 12,750,000.00
Pipa Ø 80 mm M.283 bh Rp 65,540.00
Pipa Ø 100 mm M.284 bh Rp 86,330.00
Pipa Ø 150 mm M.285 bh Rp 108,300.00
Pipa Ø 200 mm M.286 bh Rp 186,900.00
Pipa Ø 250 mm M.287 bh Rp 275,000.00
Pipa Ø 300 mm M.288 bh Rp 337,680.00
Pipa Ø 400 mm M.289 bh Rp 342,720.00
Pipa Ø 450 mm M.290 bh Rp 538,020.00
Pipa Ø 500 mm M.291 bh Rp 528,640.00
Pipa Ø 600 mm M.292 bh Rp 629,160.00
Pipa Ø 700 mm M.293 bh Rp 785,400.00
Pipa Ø 800 mm M.294 bh Rp 755,520.00
Pipa PVC Ø 63 mm M.295 m Rp 102,090.00
Pipa PVC Ø 90 mm M.296 m Rp 96,900.00
Pipa PVC Ø 110 mm M.297 m Rp 149,160.00
Pipa PVC Ø 150 mm M.298 m Rp 166,650.00
Pipa PVC Ø 200 mm M.299 m Rp 396,500.00
Pipa PVC Ø 250 mm M.300 m Rp 457,840.00
Pipa PVC Ø 300 mm M.301 m Rp 845,250.00
Pipa PVC Ø 400 mm M.302 m Rp 1,460,160.00
Pipa PVC Ø 450 mm M.303 m Rp 1,872,000.00
Pipa PVC Ø 500 mm M.304 m Rp 2,599,000.00
Pipa PVC Ø 600 mm M.305 m Rp 4,500,000.00
Pipa PVC Ø 800 mm M.306 m Rp 6,125,000.00
Pipa PVC Ø 900 mm M.307 m Rp 5,890,000.00
Pipa PVC Ø 1000 mm M.308 m Rp 8,250,000.00
Pipa PVC Ø 1100 mm M.309 m Rp 8,624,000.00
Pipa PVC Ø 1200 mm M.310 m Rp 9,696,000.00
Tee Ø 150 mm M.311 bh Rp 189,000.00
Tee Ø 200 mm M.312 bh Rp 214,000.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
Tee Ø 250 mm M.313 bh Rp 252,500.00
Tee Ø 300 mm M.314 bh Rp 327,000.00
Tee Ø 400 mm M.315 bh Rp 395,500.00
Tee Ø 450 mm M.316 bh Rp 504,000.00
Tee Ø 500 mm M.317 bh Rp 463,500.00
Tee Ø 600 mm M.318 bh Rp 545,000.00
Tee Ø 700 mm M.319 bh Rp 583,000.00
Tee Ø 800 mm M.320 bh Rp 738,000.00
Tee Ø 900 mm M.321 bh Rp 676,000.00
Tee Ø 1000 mm M.322 bh Rp 763,000.00
Tee Ø 1100 mm M.323 bh Rp 765,000.00
Tee Ø 1200 mm M.324 bh Rp 904,000.00
Valve Ø 150 mm M.325 bh Rp 6,608,000.00
Valve Ø 200 mm M.326 bh Rp 6,901,000.00
Valve Ø 250 mm M.327 bh Rp 11,685,000.00
Valve Ø 300 mm M.328 bh Rp 14,022,000.00
Valve Ø 400 mm M.329 bh Rp 16,610,000.00
Valve Ø 450 mm M.330 bh Rp 19,332,000.00
Valve Ø 500 mm M.331 bh Rp 20,907,000.00
Valve Ø 600 mm M.332 bh Rp 24,910,000.00
Valve Ø 700 mm M.333 bh Rp 33,138,000.00
Valve Ø 800 mm M.334 bh Rp 34,920,000.00
Valve Ø 900 mm M.335 bh Rp 33,176,000.00
Valve Ø 1000 mm M.336 bh Rp 33,312,000.00
Valve Ø 1100 mm M.337 bh Rp 37,125,000.00
Valve Ø 1200 mm M.338 bh Rp 47,554,000.00
BAHAN PELAPIS DAN LEMBARAN
Akustik 60 x 120 M.339 Lbr Rp 143,360.00
Akustik ukuran 30 x 30 cm M.340 Lbr Rp 35,000.00
Akustik ukuran 30 x 60 cm M.341 Lbr Rp 60,500.00
Asbes semen M.342 m2 Rp 88,800.00
Asbes 1,00 x 1,00 m M.343 lbr Rp 30,240.00
Asbes Gelombang M.344 lbr Rp 112,200.00
Asbes gelombang 92x250 M.345 Lbr Rp 113,420.00
Asbes plat M.346 m2 Rp 41,140.00
Asbes semen tebal 4 mm M.347 m2 Rp 20,670.00
Asbes semen tebal 5 mm M.348 m2 Rp 22,280.00
Asbes semen tebal 6 mm M.349 m2 Rp 24,250.00
Bilik bambu M.350 m2 Rp 81,750.00
Formika M.351 Lbr Rp 111,600.00
Gymfloor M.352 m2 Rp 167,140.00
Gypsum board 9 mm M.353 lbr Rp 107,010.00
Kalsiboard 3.5 mm M.354 lbr Rp 64,320.00
Karpet M.355 m2 Rp 547,200.00
List profil cornees gypsum M.356 m1 Rp 32,400.00
List PVC (setara Shunda Plafon,LS 301-1 Min.Silver Metalic) M.357 M' Rp 32,980.00
Multiplek M.358 lbr Rp 85,850.00
Parquet kayu M.359 m2 Rp 17,080.00
Parquet kayu gymfloor M.360 m2 Rp 321,900.00
Phenol film 12mm M.361 Lbr Rp 142,100.00
Plafond PVC (setara Shunda Plafon, Flat Gloss Half Silver) M.362 m2 Rp 109,000.00
Plastic aerator M.363 Bh Rp 39,900.00
Polycarbonat M.364 m2 Rp 181,880.00
Plywood 120x240 tbl. 4 mm M.365 Lbr Rp 72,000.00
Plywood 120x240 tbl. 6 mm M.366 Lbr Rp 78,400.00
Plywood 120x240 tbl. 9 mm M.367 Lbr Rp 124,800.00
Seng Gelombang 3" x 6" BJLS 28 M.368 Lbr Rp 56,500.00
Seng Gelombang BJLS 32 M.369 lbr Rp 132,250.00
Teakwood 4 mm 90 x 220 cm M.370 Lbr Rp 61,480.00
Teakwood 4 mm, 120 x 240 M.371 Lbr Rp 70,700.00
Tripleks M.372 Lbr Rp 44,400.00
underlayer (pelapis bawah karpet) M.373 m2 Rp 33,060.00
Wallpaper M.374 m Rp 42,350.00
.
BAHAN CAT DAN LABURAN
Cat alkali resisting primer M.375 kg Rp 38,400.00
Cat antara M.376 Kg Rp 56,700.00
Cat Besi M.377 Kg Rp 57,000.00
Cat dasar M.378 kg Rp 28,560.00
Cat dasar Besi M.379 Kg Rp 35,340.00
Cat dasar Kayu M.380 Kg Rp 38,130.00
Cat dasar Tembok M.381 Kg Rp 69,550.00
Cat duco M.382 kg Rp 72,800.00
Cat emco M.383 kg Rp 40,740.00
Cat ICI Weathershield M.384 kg Rp 66,600.00
Cat kayu M.385 kg Rp 57,390.00
Cat meni M.386 Kg Rp 17,930.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
Cat Penutup Tembok M.387 Kg Rp 43,400.00
Dempul M.388 Kg Rp 36,860.00
Flincoat M.389 kg Rp 38,850.00
Kuas M.390 Bh Rp 17,170.00
Meni ( Read Lead ) A M.391 Kg Rp 38,420.00
Meni ( Read Lead ) B M.392 Kg Rp 41,400.00
Meni besi M.393 Ltr Rp 31,200.00
Menie A M.394 Kg Rp 41,140.00
Menie B M.395 Kg Rp 41,040.00
Menie besi M.396 Kg Rp 27,540.00
Minyak cat M.397 kg Rp 42,350.00
Pengencer M.398 Kg Rp 43,400.00
Plamir M.399 Kg Rp 54,050.00
Politur M.400 L Rp 42,000.00
Teak oil M.401 L Rp 18,650.00
Tinner M.402 ltr Rp 39,520.00
Vernis M.403 L Rp 117,300.00
Vinyl M.404 Bh Rp 19,830.00
BAHAN KERAMIK
Hospital plint M.405 bh Rp 13,920.00
keramik artistik 10cm x 10cm atau 5cm x 20cm M.406 Bh Rp 3,150.00
keramik artistik 10cm x 20cm M.407 m2 Rp 94,500.00
keramik Dinding 10cm x 20cm M.408 m2 Rp 105,400.00
keramik Dinding 20cm x 20cm M.409 m2 Rp 73,750.00
Keramik Dinding artistik M.410 m2 Rp 64,680.00
Keramik mozaik ukuran 30cm x 30cm M.411 Bh Rp 12,000.00
Keramik ukuran 20cm x 20cm M.412 Bh Rp 5,310.00
keramik ukuran 30cm x 30cm M.413 Bh Rp 6,900.00
keramik ukuran 33cm x 33cm M.414 Bh Rp 7,350.00
List keramik dinding motif M.415 bh Rp 13,920.00
Marmer M.416 m2 Rp 490,500.00
marmer ukuran 100cm x 100cm M.417 Bh Rp 61,480.00
Mosaik M.418 m2 Rp 245,700.00
Plint internal cove artistik 5cm x 5cm x 20cm M.419 Bh Rp 5,270.00
Plint keramik artistik M.420 bh Rp 10,450.00
Plint keramik ukuran 10cm x 10cm M.421 Bh Rp 6,050.00
Plint keramik ukuran 10cm x 20cm M.422 Bh Rp 6,700.00
Plint keramik ukuran 5cm x 20cm M.423 Bh Rp 5,090.00
Plint Ubin M.424 bh Rp 4,100.00
Plint ubin granit M.425 bh Rp 15,000.00
Plint ubin granit ukuran 10cm x 30cm M.426 Bh Rp 13,000.00
Plint ubin granit ukuran 10cm x 40cm M.427 Bh Rp 16,940.00
Plint ubin keramik 10 x 30 cm M.428 bh Rp 4,560.00
Plint ubin keramik 10 x 40 cm M.429 bh Rp 6,720.00
Plint ubin Pc abu-abu ukuran 10cm x 30cm M.430 Bh Rp 5,200.00
Plint ubin Pc abu-abu ukuran 10cm x 40cm M.431 Bh Rp 6,480.00
Plint ubin Pc abu-abu ukuran 15cm x 20cm M.432 Bh Rp 8,190.00
Plint ubin PC warna M.433 bh Rp 6,490.00
Plint ubin teralux kerang M.434 bh Rp 6,300.00
Plint ubin teralux kerang ukuran 10cm x 30cm M.435 Bh Rp 6,790.00
Plint ubin teralux kerang ukuran 10cm x 40cm M.436 Bh Rp 8,610.00
Plint ubin teralux marmer M.437 bh Rp 14,170.00
Plint ubin teralux marmer ukuran 10cm x 30cm M.438 Bh Rp 13,580.00
Plint ubin teralux marmer ukuran 10cm x 40cm M.439 Bh Rp 18,000.00
plint ubin teralux marmer ukuran 10cm x 60cm M.440 Bh Rp 20,400.00
Plint ubin teraso M.441 bh Rp 4,740.00
Plint ubin teraso ukuran 10cm x 30cm M.442 Bh Rp 5,650.00
Plint ubin teraso ukuran 10cm x 40cm M.443 Bh Rp 6,790.00
Plint ubin warna ukuran 10cm x 20cm M.444 Bh Rp 5,670.00
Plint ubin warna ukuran 10cm x 30cm M.445 Bh Rp 5,900.00
Plint ubin warna ukuran 10cm x 40cm M.446 Bh Rp 7,150.00
plint vynil 15cm x 30cm M.447 Bh Rp 31,500.00
Porselen M.448 m2 Rp 136,350.00
Porselen 11x11 M.449 Bh Rp 6,240.00
Porselen Dinding 10x20 M.450 Bh Rp 5,550.00
Porselen Dinding 20x20 M.451 Bh Rp 8,400.00
Print outdoor flexi M.452 m2 Rp 56,700.00
Stepnosing granito M.453 bh Rp 13,230.00
Ubin abu-abu M.454 m2 Rp 33,600.00
Ubin granit M.455 m2 Rp 319,200.00
ubin granit ukuran 30cm x30cm M.456 Bh Rp 16,800.00
ubin granit ukuran 40cm x40cm M.457 Bh Rp 20,800.00
Ubin keramik M.458 Bh Rp 18,600.00
Ubin keramik artistik M.459 m2 Rp 55,440.00
ubin PC abu-abu ukuran 20cm x20 cm M.460 Bh Rp 3,630.00
ubin PC abu-abu ukuran 30cm x30 cm M.461 Bh Rp 4,320.00
ubin PC abu-abu ukuran 40cm x40cm M.462 Bh Rp 7,260.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
Ubin porselen M.463 Bh Rp 7,540.00
ubin teralux marmer ukuran 40cm x40cm M.464 Bh Rp 15,000.00
ubin teralux ukuran 30cm x30cm M.465 Bh Rp 16,240.00
Ubin teralux kerang M.466 m2 Rp 78,000.00
Ubin teralux marmer M.467 m2 Rp 335,240.00
ubin teralux marmer ukuran 30cm x30cm M.468 Bh Rp 35,360.00
ubin teralux marmer ukuran 40cm x40cm M.469 Bh Rp 38,520.00
ubin teralux marmer ukuran 60cm x60cm M.470 Bh Rp 49,500.00
Ubin teraso M.471 m2 Rp 178,350.00
ubin teraso ukuran 30cm x30cm M.472 Bh Rp 16,740.00
ubin teraso ukuran 40cm x40cm M.473 Bh Rp 15,350.00
Ubin warna M.474 m2 Rp 125,400.00
ubin warna ukuran 20cm x20cm M.475 Bh Rp 13,460.00
ubin warna ukuran 30cm x30cm M.476 Bh Rp 14,750.00
ubin warna ukuran 40cm x40 cm M.477 Bh Rp 16,530.00
BAHAN ATAP DAN ACCESORIS ATAP
Atap Alluminium Gelombang tebal 0.55 M.478 m2 Rp 207,900.00
Atap metal gelombang t 0.35 mm M.479 m2 Rp 70,400.00
Bubung stel gel. M.480 Lbr Rp 17,600.00
Bubungan gent.krmk KIA natural M.481 bh Rp 26,400.00
Bubungan genteng beton warna M.482 bh Rp 22,440.00
Bubungan genteng paris M.483 bh Rp 25,830.00
Genteng aspal M.484 Bh Rp 3,110.00
Genteng beton M.485 Bh Rp 2,680.00
Genteng beton natural M.486 bh Rp 3,080.00
Genteng beton Warna M.487 bh Rp 2,970.00
Genteng bubung M.488 Bh Rp 5,900.00
Genteng Bubung Kodok M.489 bh Rp 1,490.00
Genteng Bubung Palentong M.490 bh Rp 2,420.00
Genteng keramik KIA natural M.491 bh Rp 8,000.00
Genteng kodok M.492 Bh Rp 1,490.00
Genteng metal M.493 Bh Rp 38,500.00
Genteng palentong M.494 Bh Rp 3,030.00
Genteng Palentong Super M.495 bh Rp 4,060.00
Genteng paris M.496 bh Rp 770.00
Genteng Sirap M.497 lbr Rp 4,640.00
nok genteng aspal M.498 Bh Rp 30,000.00
nok genteng beton M.499 Bh Rp 15,300.00
Nok Genteng Decra Bond M.500 lbr Rp 83,070.00
nok genteng metal M.501 Bh Rp 98,770.00
Nok metal M.502 bh Rp 76,960.00
Nok paten 92cm M.503 Lbr Rp 47,310.00
Nok standar 40 cm 18, swg 22 M.504 m2 Rp 81,000.00
Nok standar 40x18 M.505 Bh Rp 6,950.00
Nok Stel Gelombang M.506 lbr Rp 71,040.00
Nok Stel rata M.507 lbr Rp 65,450.00
Roof Light Fiberglass M.508 lbr Rp 160,080.00
Rooflight 90x180 M.509 Lbr Rp 148,800.00
Sirap kayu M.510 Bh Rp 2,900.00
Talang / Jurai Canai Dingin M.511 M' Rp 54,450.00
BAHAN LISTRIK & ACCESORIS
Fitting Lampu M.512 bh Rp 24,750.00
Kabel NYM 3x2,5 mm2 M.513 m Rp 22,310.00
Klem Pipa Listrik M.514 bh Rp 940.00
Las Dop M.515 bh Rp 1,080.00
Mongkok (Listrik) M.516 bh Rp 1,620.00
Saklar (standar) M.517 bh Rp 40,600.00
Tee Doos M.518 bh Rp 1,530.00
Pipa listrik 5/8” M.519 btg Rp 13,880.00
BAHAN KACA
Kaca buram 12 mm M.520 m2 Rp 156,000.00
Kaca cermin 5 mm M.521 m2 Rp 142,980.00
Kaca cermin 8 mm M.522 m2 Rp 239,700.00
Kaca patri 5mm M.523 m2 Rp 94,350.00
Kaca polos M.524 m2 Rp 136,400.00
Kaca tebal 3mm M.525 m2 Rp 108,000.00
Kaca tebal 5 mm M.526 m2 Rp 151,200.00
Kaca tebal 8 mm M.527 m2 Rp 220,200.00
Kaca wireglassed 5mm M.528 m2 Rp 251,450.00
Profil kaca M.529 m Rp 81,900.00
BAHAN BETON DAN CETAKAN/CAMPURAN
Bahan teraso cor M.530 m3 Rp 989,800.00
Beton 1:2:3 M.531 M3 Rp 1,272,000.00
Beton kedap air M.532 m3 Rp 333,760.00
Buis beton D. 80 cm M.533 bh Rp 75,020.00
Conblock M.534 m2 Rp 6,480.00
Hollow Block 10 M.535 bh Rp 6,440.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
Hollow Block 15 M.536 bh Rp 7,140.00
Hollow Block 20 M.537 bh Rp 13,750.00
Kasa gypsum M.538 roll Rp 546,560.00
Kolom beton pracetak M.539 btg Rp 209,670.00
Panel Beton Pracetak M.540 Lbr Rp 145,500.00
Paving block 8 cm berwarna M.541 M2 Rp 111,100.00
Paving block 6 cm M.542 M2 Rp 141,750.00
Paving block 6cm berwarna M.543 M2 Rp 133,900.00
Paving block 8 cm natural M.544 M2 Rp 3,540.00
Roster 25/25 cm M.545 bh Rp 18,600.00
Teraso cor di tempat, tebal 3cm M.546 M3 Rp 5,670.00
Terawang (roster) M.547 bh Rp 8,420.00
BAHAN HABIS PAKAI (COMSUMABLE)
Ampelas M.548 Lbr Rp 8,130.00
Bahan Bakar M.549 Ltr Rp 10,400.00
Bahan Kimia M.550 Ltr Rp 44,950.00
Batu Gerinda M.551 bh Rp 78,000.00
Lem M.552 kg Rp 14,850.00
Lem kayu M.553 Kg Rp 14,170.00
Lem Putih M.554 Kg Rp 15,600.00
Lem vinyl M.555 kg Rp 20,200.00
Minyak bekisting M.556 Ltr Rp 6,330.00
Minyak pelumas M.557 Ltr Rp 43,050.00
Oli M.558 Ltr Rp 43,050.00
Perekat M.559 Kg Rp 51,750.00
Residu M.560 Ltr Rp 8,330.00
Sabun M.561 Kg Rp 10,640.00
Soda api M.562 Kg Rp 49,500.00
Solar M.563 L Rp 10,290.00
Gas Oxigen M.564 Tbg Rp 1,527,330.00
Gas Aceteline M.565 Tbg Rp 1,868,500.00
Kawat Solder (Timah) M.566 kg Rp 1,041,250.00
Kawat Brazing (Kuningan) M.567 kg Rp 988,000.00
PINTU JENDELA DAN ACCESORIS
Door closer M.568 set Rp 307,500.00
Door holder M.569 Bh Rp 103,790.00
Door stop M.570 Bh Rp 115,640.00
Engsel angin M.571 Bh Rp 9,600.00
Engsel jendela M.572 bh Rp 10,800.00
Engsel kupu-kupu M.573 Bh Rp 23,200.00
Engsel pintu M.574 Bh Rp 16,320.00
Jendela besi M.575 m2 Rp 1,006,500.00
Jendela naco M.576 Bh Rp 26,710.00
Jendela nako (rangka + kaca 5 mm) M.577 m2 Rp 69,300.00
Kait angin Standar M.578 Bh Rp 7,150.00
Kunci lemari M.579 Set Rp 12,600.00
Kunci silinder M.580 Bh Rp 83,250.00
Kunci slot M.581 Bh Rp 60,500.00
Kunci tanam biasa antik M.582 Bh Rp 265,000.00
Kunci tanam biasa M.583 Bh Rp 124,800.00
Kunci tanam KM M.584 Bh Rp 59,000.00
Pintu lipat M.585 m2 Rp 610,000.00
LAIN-LAIN
Badkip M.586 bh Rp 18,000.00
floor harderner M.587 Kg Rp 3,570.00
Grassblock M.588 m2 Rp 53,550.00
Gebalan Rumput M.589 m2 Rp 34,200.00
Internal cove M.590 bh Rp 7,880.00
Jaring kawat baja dilas M.591 kg Rp 14,880.00
Kalkarium M.592 Kg Rp 6,460.00
Kerta karbon M.593 lbr Rp 4,530.00
Kertas 100 x 100 cm M.594 lb Rp 6,330.00
Lantai kerja tebal 10cm M.595 m3 Rp 795,000.00
Pengelasan M.596 cm Rp 4,950.00
Prodo M.597 m2 Rp 3,360,000.00
Sealant M.598 Tube Rp 237,620.00
Sealtape M.599 bh Rp 4,240.00
Spring knip M.600 Bh Rp 8,700.00
Strorox - 100 M.601 kg Rp 52,700.00
Tali ijuk M.602 Kg Rp 22,230.00
Underlayer irubber corrugated M.603 m2 Rp 112,200.00
Venetions blinds dan vertical blinds (tirai) M.604 m2 Rp 85,500.00
Waterstop lebar 150 mm M.605 m Rp 97,500.00
Waterstop lebar 200 mm M.606 m Rp 84,800.00
Waterstop lebar 230 mm - 320 mm M.607 m Rp 117,800.00
Paket Satuan Pekerjaan Tambahan
Upah Kerja Mobiliasasi/Demobilisasi M.608 Ls Rp 1,017,000.00
No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
Alat Kerja Mobilisasi/Demobilisasi A.IV.a.1 Ls Rp 526,500.00
Bahan Kerja Mobilisasi/Demobilisasi M.IV.a.1 Ls Rp 312,500.00
Upah Kerja Pembuatan Septik Tank M.609 Ls Rp 1,740,000.00
Alat Kerja Pembuatan Septik Tank A.IV.a.2 Ls Rp 526,500.00
Bahan Kerja Pembuatan Septik Tank M.IV.a.1 Ls Rp 7,865,000.00
Upah Kerja Pembuatan Sumur Resapan Limbah M.610 Ls Rp 1,089,000.00
Alat Kerja Pembuatan Sumur Resapan Limbah A.IV.a.3 Ls Rp 413,000.00
Bahan Kerja Pembuatan Sumur Resapan Limbah M.IV.a.2 Ls Rp 4,320,000.00
Biaya Pengurusan Daya Listrik PLN M.IV.a.3 Ls Rp 6,930,000.00
Biaya Pengurusan Instalasai PDAM M.IV.a.4 Ls Rp 3,025,000.00
Bahan.Material Tambahan lainnya
Shower Mandi M.608 Unit Rp 129,600.00
Tangki Air M.609 Unit Rp 1,275,000.00
Pompa Air M.610 Unit Rp 570,000.00
Pintu Utama (Kusen+Panel) Type P1 M.611 set Rp 2,268,000.00
Pintu Utama (Kusen+Panel) Type P2 M.612 set Rp 1,888,000.00
Pintu Utama (Kusen+Panel) Type P3 M.613 set Rp 1,375,000.00
Jendela Type J1 M.614 set Rp 1,107,400.00
Jendela Type J2 M.615 set Rp 708,000.00
Jendela Type J3 M.616 set Rp 2,675,000.00
Lubang Angin M.617 Unit Rp 30,860.00
MCB + Box M.618 Unit Rp 332,500.00
Tembaga dia.1/2"-1.5m M.619 btg Rp 741,000.00
Kabel NYM 3x2,5 mm2-SNI M.620 m1 Rp 12,120.00
Kabel NYM 2x1,5 mm2-SNI M.621 m1 Rp 11,600.00
Saklar Listrik M.622 unit Rp 30,750.00
Lampu 5W M.623 unit Rp 27,600.00
Lampu 15W M.624 unit Rp 36,750.00
Lampu 20W M.625 unit Rp 45,000.00
Receiptackle M.626 unit Rp 32,700.00
Air Conditioner M.627 unit Rp 3,392,000.00
Exhaust Fan M.628 unit Rp 810,000.00
Cat Anti Bocor+Waterproofing M.629 kg Rp 20,740.00
Pohon Perdu M.630 unit Rp 535,000.00
papan nama proyek Rp 400,000.00
peralatan k3 Rp 20,000,000.00
Besi strip
Bambu diameter 6 - 8 / 600 cm
Rangka metal hollow 40.40.2 mm
Baja ringan canai dingin C75 kg Rp 15,294.12
Reng Canai Dingin m'
Semen Merah kg
HB-10 m3
HB-15 m3
HB-20 m3
Besi angker dia 8 kg
Batu traso
Semen mortar pasangan
Semen mortar Acian
ubin granit ukuran 60cm x60cm bh
lantai karpet m2
Lem Kayu/Karet Kg
Porselen Dinding 11x11 bh
keramik Dinding artistik 5cm x 20cm bh
marmer Dinding 100cm x 100cm bh
dinding batu tempel hitam bh
Vynil ukuran 30cm x 30cm bh
Reng 2 x 3 cm m3
Plamuur
Kayu bekisting m2
Peralatan potong pipa T1/manual (gergaji) /saw hari
Fhiser bh
Gedung A
No Nama pekerjaan Diameter (D) Panjang (P) Lebar (L)
1. Galian Pondasi 120.00
120.00
3 footplat
galian
pasir bawah
lantai kerja
bekisting 120.00
bekisting 0.15
bekisting 120.00
Pek lantai
galian 12.00
timbunan tanah kembali -
urugan pasir 12.00
adukan lantai
panggung
granit tile 60 x 60 10.00
keramik anti slip 1.50
pek. Lantai rabat keramik
betn 12.00
10.00
14.00
bekisting 38.40
Jendela
Pintu
Pek.Plafon PVC
GRC
gymsum
Rangka hollow
Pek.Pengecatan dinding
luar
dalam
Pek.Profilan 8.15
6.30
9.00
2.19
Pek. Lisplank -
Pek. Bubungan Atap Genteng 6.89
KUDA KUDA
segitiga
trap 1
trap 2
trap 3
total
Gedung A
Tinggi (T) Tebal Kg Jumlah Volume satuan
41.60 m3
0.10 9.60 m3
0.15 14.40 m3
- m3
- m3
- m3
0.20 3.60 m3
0.15 2.16 m3
1.0 12.00
1.0 10.00
1.0 14.00
36.00 m2
0.1
4.50 540.00 m2
PAS BATA TTAL 407.36 m2
2.00 108.88 m2
68.09
40.79
- -
-
-
- 25.47
- 61.6
-
2.00 -
-
-
-
-
862.24
-
m2
288.00
574.24 m2
- m2
-
-
4.00 27.56
-
-
1,000 2000
3,000
pengurangan kusen jendela
lebar tinggi jumlah volume
bv1 0.9 0.6 5 2.7
gw1 5.2268 2.7 1 14.11236
gw2 4.1701 2.3 1 9.59123
gw3 2.61 2.7 1 7.047
w2 1.5 1.7 9 22.95
w4 4.33 2.7 1 11.691
68.09159
garasi 4 3 1 12
215.5
80 -