PEKERJAAN : COR BETON JALAN SETAPAK MENUJU MASJID NURUL IMAN RT.19 JALAN PRUMNAS KEL. BALAI AGUNG KEC. SEKAYU
LOKASI : KECAMATAN SEKAYU
BIAYA : Rp 99,383,000.00
HARGA SATUAN
NO URAIAN PEKERJAAN ANALISA VOLUME SATUAN BAHAN + UPAH JUMLAH
REKAPITULASI BIAYA
KEGIATAN : APBD PADA DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN KABUPATEN MUSI BANYUASIN TAHUN ANGGARAN 2022
PEKERJAAN : COR BETON JALAN SETAPAK MENUJU MASJID NURUL IMAN RT.19 JALAN PRUMNAS KEL. BALAI AGUNG KEC. SEKAYU
LOKASI : KECAMATAN SEKAYU
TERBILANG : #NAME?
DELA NOVITA SARI, S.T. BAMBANG IRAWAN, ST. SURATMAN TUBAGUS, ST.
NIP. 19781124 200801 2003 NIP. 19720505 200701 1015 NIP. 19720803 201001 1001
MENGETAHUI,
KEPALA DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN
KABUPATEN MUSI BANYUASIN
1 Pek. Bekisting Jalan Cor Beton (pemakaian berulang) 135.00 - 0.20 2.00 135 x 0,2 x 2 / 4 13.50 M2
2 Pek. Pas. Lapisan Plastik Cor Beton 135.00 2.50 - - 135 x 2,5 337.50 M2
3 Pek. Cor Beton Ad. 1:2:3 135.00 2.00 0.20 - 135 x 2 x 0,2 54.00 M3
4 Pek. Pelaburan Aspal (Buras) 135.00 2.00 - 0.80 135 x 2 x 0,8 216.00 Ltr
SPESIFIKASI TEKNIK
KEGIATAN : APBD PADA DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN KABUPATEN MUSI BANYUASIN TAHUN ANGGARAN 2022
PEKERJAAN : COR BETON JALAN SETAPAK MENUJU MASJID NURUL IMAN RT.19 JALAN PRUMNAS KEL. BALAI AGUNG KEC. SEKAYU
LOKASI : KECAMATAN SEKAYU
Pek. Pas. Lapisan Plastik Cor Beton - Plastik non woven sebagai separator/pemisah untuk mencegah
tercampurnya material satu dengan yang lain.
#NAME?
0
0
#NAME?
0
0
#NAME?
#NAME?
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK Dinas Pekerjaan Umum Bina Marga
NAMA PAKET 0
Sekayu
PROP / KAB / KODYA Musi Banyuasin
ITEM PEMBAYARAN NO. #REF! PERKIRAAN VOL. PEK.
JENIS PEKERJAAN #REF! TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN #REF! % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK Dinas Pekerjaan Umum Bina Marga
NAMA PAKET 0
Sekayu
PROP / KAB / KODYA Musi Banyuasin
ITEM PEMBAYARAN NO. #REF! PERKIRAAN VOL. PEK.
JENIS PEKERJAAN #REF! TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN #REF! % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
1. Pekerja (L01) Jam #REF! 12,051.40
2. Mandor (L03) Jam #REF! 13,089.35
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK Dinas Pekerjaan Umum Bina Marga
NAMA PAKET 0
Sekayu
PROP / KAB / KODYA Musi Banyuasin
ITEM PEMBAYARAN NO. #REF! PERKIRAAN VOL. PEK.
JENIS PEKERJAAN #REF! TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN #REF! % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
1. #REF! (M31) Kg #REF! 4,836.72
2 Kerosene (M11) Liter #REF! 8,525.00
C. PERALATAN
PROYEK :
No. PAKET KONTRAK Dinas Pekerjaan Umum Bina Marga
NAMA PAKET 0
Sekayu
PROP / KAB / KODYA Musi Banyuasin
ITEM PEMBAYARAN NO. #REF! PERKIRAAN VOL. PEK.
JENIS PEKERJAAN #REF! TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN #REF! % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
UK
HARGA SATUAN
JUMLAH
HARGA
(Rp.)
279.89
60.27
340.16
11,082.80
4,154.78
15,237.58
100.00
100.00
15,677.75
2,351.66
18,029.41
Kerja dan Peralatan, volume dan/atau ukuran
UK
HARGA SATUAN
: 1.00
: 7,792.18
: 0.00
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Kerja dan Peralatan, volume dan/atau ukuran
UK
HARGA SATUAN
: 1.00
: 31,431.42
: 0.00
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Kerja dan Peralatan, volume dan/atau ukuran
UK
HARGA SATUAN
: 1.00
: 40,421.71
: 0.00
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Kerja dan Peralatan, volume dan/atau ukuran
UK
HARGA SATUAN
: 1.00
: 40,454.30
: 0.00
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Kerja dan Peralatan, volume dan/atau ukuran
DPU.CK.PENG
BJ BESI BERAT BESI / KG
7,850.00 1.18
7,850.00 2.66
7,850.00 4.73
7,850.00 7.39
7,850.00 10.65
7,850.00 14.49
7,850.00 18.93
8.58
DPU.CK.PENG
LEVEL 1 LEVEL 2
Divisi 1 Design development 1.1
1.2
1.3
1.4
1.5
Setting-out
Fasiltas sementara
Mobilisasi dan demobilisasi
Pembersihan lahan dan removal
Galian, pemotongan, timbunan dan buangan
Beton
Logam
Kayu dan plastik
Pasangan (masonry)
Perlindungan suhu dan kelembaban
Bukaan (jendela, pintu, kusen)
Finishing
Plumbing
Pemanasan, ventilasi dan pengkondisian udara
Pencegahan kebakaran
Peralatan
Konstruksi khusus
Conveying equipmentair minum di luar
Pekerjaan perpipaan
bangunan gedung
KERTAS KERJA STANDAR SATUAN HARGA KONSTRUKSI
KABUPATEN MUSI BANYUASIN TAHUN ANGGARAN 2020 553,280 520,000 33,280
KECAMATAN SEKAYU 70,224 66,000 4,224
NO GOLONGAN KELOMPOK SUB KELOMPOK ITEM SSH MERK SPESIFIKASI SATUAN Sekayu Babat Supat Sungai Lilin Tungkal Jaya Bayung Lencir Lawang Wetan Babat Toman Sanga Desa Batanghari Leko Keluang Sungai Keruh Jirak Jaya Plakat Tinggi Lais Lalan
1 MATERIAL / BAHAN BAHAN BANGUNAN LAINNYA Minyak Bekisting - - liter 15,787 14,352 12,480 15,787 14,352 12,480 15,787 14,352 12,480 15,787 15,787 15,787 15,787 15,787 15,787 15,787 15,787 15,787 15,787 15,787 15,787
2 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku 1/2 Inci - - Kg 37,014 33,649 29,260 41,300 37,545 32,648 37,223 33,839 29,425 37,397 32,005 37,223 35,345 39,658 56,008 43,375 46,128 46,128 37,571 37,638 31,715
3 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku 1 Inci - - Kg 34,995 31,814 27,664 33,925 30,841 26,818 29,778 27,071 23,540 37,397 37,824 29,778 33,416 37,495 45,388 45,878 46,128 46,128 49,730 40,911 31,715
4 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku 1 1/2 Inci - - Kg 27,996 25,451 22,131 30,680 27,891 24,253 28,154 25,594 22,256 37,397 30,259 29,778 33,416 39,658 45,388 43,375 46,128 46,128 45,085 32,728 30,274
5 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku 2 Inci - - Kg 25,197 22,906 19,918 27,891 25,355 22,048 22,334 20,304 17,655 25,430 24,208 29,778 26,733 37,495 45,388 30,585 36,343 36,343 31,560 27,849 25,949
6 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku 2,5 Inci - - Kg 25,197 22,906 19,918 27,891 25,355 22,048 22,334 20,304 17,655 23,934 24,208 29,778 26,733 37,495 45,388 30,585 36,343 36,343 33,814 27,849 25,949
7 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku 3 Inci - - Kg 25,197 22,906 19,918 27,891 25,355 22,048 22,334 20,304 17,655 23,934 24,208 29,778 26,733 37,495 45,388 30,585 36,343 36,343 30,056 27,849 23,787
8 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku 4 Inci - - Kg 25,197 22,906 19,918 27,891 25,355 22,048 22,334 20,304 17,655 23,934 24,208 29,778 26,733 37,495 45,388 30,585 36,343 36,343 34,565 27,849 23,787
9 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku 5 Inci - - Kg 25,197 22,906 19,918 27,891 25,355 22,048 22,334 20,304 17,655 47,868 24,208 29,778 26,733 37,495 45,388 30,585 36,343 36,343 36,068 27,849 23,787
10 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Seng - - Kg 48,993 44,539 38,730 59,000 53,636 46,640 56,308 51,189 44,512 49,364 60,518 59,556 53,466 53,935 64,009 86,751 76,880 76,880 52,599 61,886 57,664
11 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Asbes - - Kg 62,991 57,264 49,795 48,809 44,372 38,584 56,308 51,189 44,512 49,364 48,007 63,346 53,466 63,452 68,082 115,668 58,150 58,150 63,938 61,886 57,664
12 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Plywood - - Kg 59,222 53,838 46,816 41,300 37,545 32,648 52,112 47,375 41,195 44,876 40,006 63,346 42,413 74,989 48,007 86,751 43,612 43,612 52,599 108,300 51,897
13 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Beton Biasa - - Kg 59,222 53,838 46,816 51,625 46,932 40,810 74,445 67,678 58,850 37,397 40,006 56,308 80,199 47,589 64,009 76,463 38,441 38,441 45,085 32,728 43,248
14 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Beton 2" isi 100 batang - - Kotak 48,993 44,539 38,730 38,350 34,863 30,316 81,890 74,446 64,735 37,397 40,006 84,462 80,199 79,316 42,363 76,463 33,827 33,827 37,571 38,679 57,664
15 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Beton 3" isi 100 batang - - Kotak 88,833 80,758 70,224 66,375 60,341 52,470 89,334 81,213 70,620 67,314 40,006 84,462 80,199 79,316 45,388 76,463 46,128 46,128 46,888 38,679 57,664
16 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Beton 4" isi 100 batang - - Kotak 69,990 63,627 55,328 81,125 73,750 64,130 104,223 94,749 82,390 59,835 40,006 84,462 80,199 79,316 52,953 86,751 81,494 81,494 42,625 38,679 72,080
17 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Sewkrup 1" Kuningan - - Kotak 118,983 108,166 94,058 18,438 16,761 14,575 44,667 40,607 35,310 26,926 16,002 141,447 28,275 97,486 22,694 24,579 23,065 23,065 15,630 38,679 21,624
18 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Sewkrup 1/2" Kuningan - - Kotak 22,209 20,190 17,556 20,918 19,016 16,536 42,231 38,392 33,384 22,438 16,002 141,447 20,050 15,863 22,694 31,808 29,075 29,075 17,432 30,943 21,624
19 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Sewkrup 1/4" Kuningan - - Kotak 22,209 20,190 17,556 27,891 25,355 22,048 119,112 108,284 94,160 14,959 16,002 141,447 20,050 15,863 32,005 50,605 29,075 29,075 21,791 23,207 21,624
20 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Khusus Onduline - - Kotak 2,517 2,289 1,990 2,950 2,682 2,332 2,675 2,432 2,115 2,543 2,721 2,675 2,404 2,697 2,721 101,209 2,907 2,907 3,006 2,785 2,883
21 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku beton kuning (daikin) 4'' - - Kotak 69,990 63,627 55,328 81,125 73,750 64,130 70,385 63,986 55,640 52,356 53,607 49,269 53,466 79,316 48,414 86,751 84,569 84,569 71,042 38,679 50,456
22 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku beton kuning (daikin) 3'' - - Kotak 62,991 57,264 49,795 66,375 60,341 52,470 59,556 54,142 47,080 52,356 40,006 39,416 46,783 38,071 45,388 72,292 50,742 50,742 39,784 40,911 36,040
23 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku beton kuning (daikin ) 2'' - - Kotak 48,993 44,539 38,730 36,875 33,523 29,150 42,231 38,392 33,384 29,917 35,205 52,112 40,099 39,658 45,388 57,834 49,203 49,203 35,521 38,679 31,715
24 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku beton kuning (daikin )1,5'' - - Kotak 34,995 31,814 27,664 32,450 29,500 25,652 35,192 31,993 27,820 22,438 24,004 35,192 33,416 23,795 45,388 51,995 49,203 49,203 28,417 38,679 22,344
25 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku beton kuning (daikin )1'' - - Kotak 27,996 25,451 22,131 22,125 20,114 17,490 35,192 31,993 27,820 14,959 16,002 14,921 20,050 28,554 45,388 28,917 21,806 21,806 25,575 23,207 15,137
26 MATERIAL / BAHAN BAHAN BANGUNAN PAKU Paku Biasa - - Kg 25,197 22,906 19,918 27,891 25,355 22,048 22,334 20,304 17,655 25,430 24,208 29,778 26,733 37,495 45,388 30,585 36,343 36,343 31,560 27,849 25,949
27 MATERIAL / BAHAN BAHAN BANGUNAN BATU Koral - - M3 699,899 636,272 553,280 766,995 697,268 606,320 714,674 649,704 564,960 871,191 756,470 670,007 777,570 634,524 756,470 994,018 768,804 768,804 826,551 850,930 1,297,435
28 MATERIAL / BAHAN BAHAN BANGUNAN BATU Kerikil - - M3 740,278 672,980 585,200 737,495 670,450 583,000 729,563 663,240 576,730 871,191 864,122 714,674 706,882 1,031,102 1,120,158 841,092 768,804 768,804 826,551 818,202 1,239,771
29 MATERIAL / BAHAN BAHAN BANGUNAN BATU Kerikil (Maks 30 mm) - - M3 740,278 672,980 585,200 737,495 670,450 583,000 729,563 663,240 576,730 871,191 864,122 714,674 706,882 1,031,102 1,120,158 841,092 768,804 768,804 826,551 818,202 1,239,771
30 MATERIAL / BAHAN BAHAN BANGUNAN BATU Agregat Kasar - - M3 740,278 672,980 585,200 737,495 670,450 583,000 714,674 649,704 564,960 855,633 864,122 699,785 706,882 761,429 862,730 841,092 768,804 768,804 826,551 834,566 1,297,435
31 MATERIAL / BAHAN BAHAN BANGUNAN BATU Agregat A - - M3 749,527 681,388 592,511 774,638 704,217 612,362 777,480 706,800 614,609 913,359 918,554 739,575 726,811 833,885 902,931 898,567 835,618 835,618 855,040 852,883 1,404,250
32 MATERIAL / BAHAN BAHAN BANGUNAN BATU Agregat B - - M3 800,213 727,466 632,579 850,752 773,411 672,531 701,159 637,417 554,276 930,981 984,149 718,399 714,259 835,482 922,476 817,343 873,549 873,549 797,540 882,953 1,078,383
33 MATERIAL / BAHAN BAHAN BANGUNAN BATU Beton K-250 - - M3 1,619,979 1,472,708 1,280,615 1,655,715 1,505,195 1,308,865 1,703,262 1,548,420 1,346,452 1,882,594 1,905,473 1,652,012 1,611,564 1,887,654 2,219,958 1,858,322 1,886,123 1,886,123 1,936,782 1,897,838 2,669,977
34 MATERIAL / BAHAN BAHAN BANGUNAN BATU Batu kali - - M3 699,899 636,272 553,280 737,495 670,450 583,000 670,007 609,098 529,650 917,861 756,470 556,038 706,882 523,482 756,470 535,240 654,182 654,182 751,410 752,746 1,225,355
35 MATERIAL / BAHAN BAHAN BANGUNAN BATU Batu pecah 5 - 7 - - M3 699,899 636,272 553,280 737,495 670,450 583,000 684,896 622,633 541,420 840,076 801,858 670,007 706,882 745,566 800,113 764,629 707,299 707,299 751,410 818,202 1,225,355
36 MATERIAL / BAHAN BAHAN BANGUNAN BATU Batu pecah 3 - 5 - - M3 699,899 636,272 553,280 737,495 670,450 583,000 684,896 622,633 541,420 855,633 898,686 670,007 735,157 713,840 832,117 764,629 691,923 691,923 751,410 850,930 1,239,771
37 MATERIAL / BAHAN BAHAN BANGUNAN BATU Batu pecah 2 - 3 - - M3 740,278 672,980 585,200 737,495 670,450 583,000 714,674 649,704 564,960 855,633 864,122 699,785 706,882 761,429 800,113 841,092 768,804 768,804 826,551 834,566 1,297,435
38 MATERIAL / BAHAN BAHAN BANGUNAN BATU Batu pecah 1 - 2 (Split) - - M3 740,278 672,980 585,200 737,495 670,450 583,000 729,563 663,240 576,730 871,191 864,122 714,674 706,882 1,031,102 1,120,158 841,092 768,804 768,804 826,551 818,202 1,239,771
39 MATERIAL / BAHAN BAHAN BANGUNAN BATU Batu pecah 0,5 - 1 (Split halus) - - M3 755,084 686,440 596,904 737,495 670,450 583,000 729,563 663,240 576,730 886,747 915,329 714,674 706,882 713,840 800,113 917,555 784,180 784,180 751,410 850,930 1,225,355
40 MATERIAL / BAHAN BAHAN BANGUNAN BATU Batu Krokos - - M3 666,250 605,682 526,680 663,746 603,405 524,700 774,231 703,846 612,040 700,064 915,329 714,674 636,194 475,893 736,104 688,166 654,182 654,182 901,692 1,227,303 1,225,355
41 MATERIAL / BAHAN BAHAN BANGUNAN BATU Batu Sikat - - M3 666,250 605,682 526,680 663,746 603,405 524,700 703,846 639,860 556,400 700,064 915,329 446,672 636,194 634,524 720,101 688,166 654,182 654,182 901,692 818,202 1,225,355
42 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Susun Sirih) 3 x 20 - - M2 214,681 195,165 169,708 213,874 194,431 169,070 215,892 196,265 170,665 230,244 249,635 236,492 209,237 237,947 240,034 229,389 230,641 230,641 232,938 240,552 230,655
43 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Susun Sirih) 3 x 30 - - M2 229,487 208,624 181,412 228,624 207,840 180,730 230,781 209,801 182,435 245,800 266,278 239,308 223,375 253,810 256,036 244,681 247,135 247,135 240,451 256,916 245,071
44 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Susun Sirih) 3 x 40 - - M2 244,292 222,084 193,116 243,374 221,249 192,390 245,670 223,336 194,205 261,357 282,920 267,461 237,512 269,673 272,038 259,974 261,393 261,393 255,479 273,280 259,487
45 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Susun Sirih) 3 x 50 - - M2 259,098 235,543 204,820 258,124 234,658 204,050 260,559 236,872 205,975 276,914 299,562 281,538 251,650 285,536 288,041 275,267 290,748 290,748 270,508 289,644 273,903
46 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Susun Sirih) 3 x 60 - - M2 266,500 242,273 210,672 265,498 241,362 209,880 268,003 243,639 211,860 284,692 348,733 281,538 258,719 293,468 296,042 282,913 290,748 290,748 278,022 297,826 281,111
47 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Susun Sirih) 6 x 30 - - M2 266,500 242,273 210,672 265,498 241,362 209,880 268,003 243,639 211,860 284,692 307,884 288,577 258,719 293,468 296,042 282,913 298,016 298,016 278,022 297,826 281,111
48 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Susun Sirih) 9 x 30 - - M2 273,903 249,003 216,524 272,874 248,067 215,710 275,448 250,407 217,745 292,471 316,204 281,538 265,788 301,399 304,043 290,559 292,145 292,145 285,536 306,008 288,319
49 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Diagonal) 15 x 30 - - M2 266,500 242,273 210,672 265,498 241,362 209,880 268,003 243,639 211,860 292,471 307,884 281,538 258,719 293,468 296,042 282,913 305,285 305,285 278,022 297,826 281,111
50 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Diagonal) 20 x 40 - - M2 288,709 262,463 228,228 287,624 261,476 227,370 290,337 263,943 229,515 308,028 332,847 295,615 279,925 317,262 320,045 305,852 307,522 307,522 300,564 322,372 302,735
51 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Bintik Bakar) 15 x 15 - - M2 229,487 208,624 181,412 228,624 207,840 180,730 230,781 209,801 182,435 308,028 266,278 295,615 223,375 253,810 256,036 244,681 261,673 261,673 240,451 256,916 245,071
52 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Bintik Bakar) 10 x 20 - - M2 251,695 228,813 198,968 250,748 227,953 198,220 253,114 230,104 200,090 269,136 291,241 256,092 244,582 277,605 280,040 267,621 290,748 290,748 262,994 281,461 266,695
53 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Bintik Bakar) 10 x 30 - - M2 244,292 222,084 193,116 243,374 221,249 192,390 245,670 223,336 194,205 269,136 272,038 253,385 237,512 269,673 272,038 259,974 290,748 290,748 255,479 273,280 259,487
54 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Bintik Bakar) 15 x 30 - - M2 296,111 269,192 234,080 294,998 268,180 233,200 297,781 270,710 235,400 315,806 328,047 300,759 286,995 325,194 328,047 313,499 392,509 392,509 308,079 330,554 309,943
55 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Bintik Bakar) 20 x 40 - - M2 310,917 282,652 245,784 309,748 281,589 244,860 312,670 284,246 247,170 331,363 344,049 315,648 301,132 341,057 344,049 328,791 330,586 330,586 323,107 346,918 324,359
56 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Bintik Bakar) 30 x 60 - - M2 392,348 356,680 310,156 390,873 355,339 308,990 394,560 358,691 311,905 416,927 432,061 408,231 378,889 428,304 432,061 412,900 421,584 421,584 405,761 436,920 403,646
57 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Alur) 10 x 20 - - M2 229,487 208,624 181,412 228,624 207,840 180,730 230,781 209,801 182,435 254,569 256,036 242,123 223,375 253,810 256,036 244,681 290,748 290,748 240,451 256,916 245,071
58 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Alur) 15 x 30 - - M2 266,500 242,273 210,672 265,498 241,362 209,880 268,003 243,639 211,860 284,692 296,042 281,538 258,719 293,468 296,042 282,913 290,748 290,748 278,022 297,826 281,111
59 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Andesit Polos (Alur) 20 x 40 - - M2 281,306 255,732 222,376 280,248 254,771 221,540 282,892 257,175 223,630 300,250 312,044 295,615 272,857 309,331 312,044 298,206 305,285 305,285 293,050 314,190 295,527
60 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Candi 15 x 15 - - M2 229,487 208,624 181,412 228,624 207,840 180,730 230,781 209,801 182,435 300,250 256,036 239,308 223,375 253,810 256,036 244,681 246,017 246,017 240,451 256,916 245,071
61 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Candi 15 x 30 - - M2 236,889 215,354 187,264 235,998 214,544 186,560 238,225 216,568 188,320 253,579 264,038 246,346 230,444 261,742 264,038 252,328 253,706 253,706 247,966 265,097 252,279
62 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Candi 20 x 40 - - M2 251,695 228,813 198,968 250,748 227,953 198,220 253,114 230,104 200,090 269,136 280,040 256,092 244,582 277,605 280,040 267,621 269,082 269,082 262,994 281,461 266,695
63 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Paticitoroso 10 x 20 - - M2 310,917 282,652 245,784 309,748 281,589 244,860 312,670 284,246 247,170 331,363 344,049 388,241 301,132 341,057 344,049 328,791 363,435 363,435 323,107 346,918 324,359
64 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Paticitoroso 15 x 30 - - M2 333,126 302,841 263,340 331,873 301,703 262,350 335,004 304,549 264,825 354,698 368,052 394,154 322,338 364,851 368,052 351,729 353,650 353,650 345,649 371,464 345,983
65 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Paticitoroso 20 x 40 - - M2 333,126 302,841 263,340 331,873 301,703 262,350 335,004 304,549 264,825 354,698 368,052 394,154 322,338 364,851 368,052 351,729 353,650 353,650 345,649 371,464 345,983
66 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Salagedang (S) 15 x 15 - - M2 259,098 235,543 204,820 258,124 234,658 204,050 260,559 236,872 205,975 354,698 288,041 274,500 251,650 285,536 288,041 275,267 282,025 282,025 270,508 289,644 273,903
67 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Banjar 40 x 40 - - M2 259,098 235,543 204,820 258,124 234,658 204,050 260,559 236,872 205,975 276,914 288,041 273,092 251,650 285,536 288,041 275,267 276,769 276,769 270,508 289,644 273,903
68 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Napoli 10 x 20 - - M2 229,487 208,624 181,412 228,624 207,840 180,730 230,781 209,801 182,435 276,914 256,036 242,123 223,375 253,810 256,036 244,681 290,748 290,748 240,451 256,916 245,071
69 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Napoli 15 x 30 - - M2 266,500 242,273 210,672 265,498 241,362 209,880 268,003 243,639 211,860 284,692 296,042 281,538 258,719 293,468 296,042 282,913 290,748 290,748 278,022 297,826 281,111
70 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Napoli 20 x 40 - - M2 266,500 242,273 210,672 265,498 241,362 209,880 268,003 243,639 211,860 284,692 296,042 281,538 258,719 293,468 296,042 282,913 290,748 290,748 278,022 297,826 281,111
71 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Papan Catur 20 x 40 - - M2 273,903 249,003 216,524 272,874 248,067 215,710 275,448 250,407 217,745 284,692 304,043 288,577 265,788 301,399 304,043 290,559 298,016 298,016 285,536 306,008 288,319
72 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Alur Miring 20 x 40 - - M2 273,903 249,003 216,524 272,874 248,067 215,710 275,448 250,407 217,745 292,471 304,043 281,538 265,788 301,399 304,043 290,559 292,145 292,145 285,536 306,008 288,319
73 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Alur Cacing 20 x 50 - - M2 273,903 249,003 216,524 272,874 248,067 215,710 275,448 250,407 217,745 292,471 304,043 281,538 265,788 301,399 304,043 290,559 292,145 292,145 285,536 306,008 288,319
74 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Kombinasi 20 x 50 - - M2 407,153 370,139 321,860 405,623 368,748 320,650 409,449 372,227 323,675 432,483 448,063 337,982 393,026 444,167 448,063 428,192 433,214 433,214 420,790 450,012 418,062
75 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Polos Bakar 6 x 30 - - M2 259,098 235,543 204,820 258,124 234,658 204,050 260,559 236,872 205,975 276,914 288,041 267,461 251,650 285,536 288,041 275,267 290,748 290,748 270,508 289,644 273,903
76 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Polos Bakar 6 x 40 - - M2 251,695 228,813 198,968 250,748 227,953 198,220 253,114 230,104 200,090 269,136 280,040 260,423 244,582 277,605 280,040 267,621 269,082 269,082 262,994 281,461 266,695
77 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Susun Sirih Boros 3 x 30 - - M2 214,681 195,165 169,708 213,874 194,431 169,070 215,892 196,265 170,665 230,244 240,034 226,639 209,237 237,947 240,034 229,389 234,052 234,052 225,423 240,552 230,655
78 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Susun Sirih Boros 3 x 40 - - M2 222,083 201,894 175,560 221,249 201,135 174,900 223,336 203,033 176,550 245,800 248,035 232,269 216,306 245,879 248,035 237,036 239,867 239,867 232,938 248,733 237,864
79 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Purwakarta 5 x 20 - - M2 214,681 195,165 169,708 213,874 194,431 169,070 215,892 196,265 170,665 230,244 240,034 232,269 209,237 237,947 240,034 229,389 276,210 276,210 225,423 240,552 230,655
80 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Purwakarta 5 x 30 - - M2 229,487 208,624 181,412 228,624 207,840 180,730 230,781 209,801 182,435 245,800 256,036 242,123 223,375 253,810 256,036 244,681 276,210 276,210 240,451 256,916 245,071
81 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Purwakarta 10 x 20 - - M2 207,278 188,434 163,856 206,499 187,726 163,240 208,447 189,497 164,780 222,465 232,033 242,123 202,169 230,016 232,033 221,743 261,673 261,673 217,909 232,369 223,448
82 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Purwakarta 10 x 30 - - M2 222,083 201,894 175,560 221,249 201,135 174,900 223,336 203,033 176,550 238,021 248,035 226,314 216,306 245,879 248,035 237,036 261,673 261,673 232,938 248,733 237,864
83 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Purwakarta 15 x 30 - - M2 229,487 208,624 181,412 228,624 207,840 180,730 230,781 209,801 182,435 245,800 256,036 233,759 223,375 253,810 256,036 244,681 407,047 407,047 240,451 256,916 245,071
84 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Templek Purwakarta - - M2 133,250 121,136 105,336 132,749 120,681 104,940 134,001 121,820 105,930 144,680 152,022 228,046 131,481 150,700 152,022 145,280 247,135 247,135 142,768 150,549 151,368
85 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Templek Salagedang - - M2 133,250 121,136 105,336 132,749 120,681 104,940 134,001 121,820 105,930 144,680 158,102 228,046 131,481 150,700 152,022 145,280 247,135 247,135 142,768 150,549 151,368
86 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Hijau Sukabumi - - M2 244,292 222,084 193,116 243,374 221,249 192,390 245,670 223,336 194,205 261,357 282,920 253,385 237,512 269,673 272,038 259,974 261,393 261,393 255,479 273,280 259,487
87 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Novotel 3 x 20 - - M2 214,681 195,165 169,708 213,874 194,431 169,070 215,892 196,265 170,665 230,244 249,635 225,231 209,237 237,947 240,034 229,389 232,598 232,598 225,423 245,461 230,655
88 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Novotel 3 x 30 - - M2 222,083 201,894 175,560 221,249 201,135 174,900 223,336 203,033 176,550 238,021 257,957 232,269 216,306 245,879 248,035 237,036 239,867 239,867 232,938 248,733 237,864
89 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Coating (DOF-Candi-Gloss) - - M2 74,028 67,298 58,520 73,750 67,045 58,300 74,445 67,678 58,850 77,785 83,212 77,423 70,688 79,316 80,011 76,463 94,493 94,493 75,141 81,820 72,080
90 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Batu Palimanan (RTM) 10 x 20 cm - - M2 222,083 201,894 175,560 294,998 268,180 233,200 223,336 203,033 176,550 238,021 291,241 232,269 216,306 245,879 248,035 237,036 238,330 238,330 232,938 309,429 360,399
91 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Batu Palimanan (RTM) 15 x 30 cm - - M2 236,889 215,354 187,264 235,998 214,544 186,560 238,225 216,568 188,320 253,579 307,884 241,203 230,444 261,742 264,038 252,328 253,706 253,706 247,966 309,429 252,279
92 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Batu Palimanan (RTM) 20 x 40 cm - - M2 259,098 235,543 204,820 258,124 234,658 204,050 260,559 236,872 205,975 276,914 299,562 263,537 251,650 285,536 288,041 275,267 276,769 276,769 270,508 309,429 273,903
93 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Batu Palimanan (RTA) 10 x 20 cm - - M2 222,083 201,894 175,560 221,249 201,135 174,900 223,336 203,033 176,550 238,021 257,957 239,308 216,306 245,879 248,035 237,036 247,135 247,135 232,938 278,486 237,864
94 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Doreng / Cacing (Bevel) 10 x 20 cm - - M2 222,083 201,894 175,560 221,249 201,135 174,900 223,336 203,033 176,550 238,021 257,957 268,003 216,306 245,879 248,035 237,036 247,135 247,135 232,938 294,553 237,864
95 MATERIAL / BAHAN BAHAN BANGUNAN BATU ALAM Doreng / Cacing (Bevel) 15 x 30 cm - - M2 236,889 215,354 187,264 235,998 214,544 186,560 238,225 216,568 188,320 253,579 274,598 246,346 230,444 261,742 264,038 252,328 253,706 253,706 247,966 265,097 252,279
96 MATERIAL / BAHAN BAHAN BANGUNAN Batu Bata - - Buah 1,036 942 819 805 700 879 765
885 967 1,089 1,059 915 918 1,110 1,513 1,223 1,154 1,154 1,128 1,005 1,730
97 MATERIAL / BAHAN BAHAN BANGUNAN Batako - - Buah 3,109 2,826 2,458 2,950 2,565 3,519 3,060
3,245 3,871 5,445 5,825 4,467 4,010 6,345 6,401 4,129 4,361 4,361 6,011 4,091 5,766
98 MATERIAL / BAHAN BAHAN BANGUNAN Paving Block Persegi t = 6 cm - - Buah 3,702 3,365 2,926 1,877 1,632 2,233 1,942
2,065 2,457 3,889 2,996 3,519 2,828 3,490 3,200 3,059 3,634 3,634 4,509 3,109 3,748
99 MATERIAL / BAHAN BAHAN BANGUNAN Paving Block Persegi Warna t = 6 cm - - Buah 4,145 3,768
210 MATERIAL / BAHAN BAHAN BANGUNAN PIPA BESI Pipa Galvanized Medium dia. 2 " - - M' 340,528 309,571 269,192 339,248 308,407 268,180 342,448 311,317 270,710 348,537 376,053 358,961 329,408 372,783 376,053 359,376 370,703 370,703 353,163 376,373 353,191
211 MATERIAL / BAHAN BAHAN BANGUNAN PIPA BESI Pipa Galvanized Medium dia. 4 " - - M' 636,639 578,763 503,272 634,246 576,587 501,380 640,229 582,027 506,110 647,709 696,098 668,654 612,160 690,045 696,098 665,228 690,526 690,526 653,727 703,654 641,510
212 MATERIAL / BAHAN BAHAN BANGUNAN PIPA BESI Pipa Galvanized Medium dia. 6 " - - M' 1,125,223 1,022,930 889,504 1,120,992 1,019,084 886,160 1,131,568 1,028,698 894,520 1,141,344 1,224,173 1,175,423 1,078,702 1,213,528 1,224,173 1,169,883 1,213,871 1,213,871 1,149,658 1,243,667 1,117,236
213 MATERIAL / BAHAN BAHAN BANGUNAN KAYU Kayu Kelas I - - M3 5,922,224 5,383,840 4,681,600 5,899,960 5,363,600 4,664,000 4,764,496 4,331,360 3,766,400 6,731,381 4,800,675 4,905,807 5,683,331 4,758,930 6,432,905 4,893,627 5,088,083 5,088,083 4,508,460 6,152,879 6,487,173
214 MATERIAL / BAHAN BAHAN BANGUNAN KAYU Kayu Kelas II - - M3 3,701,390 3,364,900 2,926,000 4,424,970 4,022,700 3,498,000 4,168,934 3,789,940 3,295,600 4,682,050 4,587,846 4,384,961 3,534,410 3,965,775 5,600,788 4,281,924 4,528,394 4,528,394 4,057,614 4,909,212 5,045,579
215 MATERIAL / BAHAN BAHAN BANGUNAN KAYU Kayu Kelas II Balok - - M3 3,701,390 3,364,900 2,926,000 4,424,970 4,022,700 3,498,000 4,168,934 3,789,940 3,295,600 4,682,050 4,587,846 4,384,961 3,534,410 3,965,775 5,600,788 4,281,924 4,528,394 4,528,394 4,057,614 4,909,212 5,045,579
216 MATERIAL / BAHAN BAHAN BANGUNAN KAYU Kayu Kelas III - - M3 2,961,112 2,691,920 2,340,800 2,949,980 2,681,800 2,332,000 3,424,482 3,113,165 2,707,100 3,365,691 3,738,126 3,448,845 2,615,463 3,172,620 4,000,563 3,517,295 3,568,927 3,568,927 3,757,050 4,091,010 3,892,304
217 MATERIAL / BAHAN BAHAN BANGUNAN KAYU Kayu Kelas IV - - M3 2,665,001 2,422,728 2,106,720 2,654,982 2,413,620 2,098,800 2,828,920 2,571,745 2,236,300 2,842,139 3,058,031 2,688,692 2,474,087 3,965,775 2,960,416 3,058,517 3,159,700 3,159,700 3,306,204 2,945,527 3,603,985
218 MATERIAL / BAHAN BAHAN BANGUNAN KAYU - - Batang 29,611 26,919 23,408 20,114 17,490 16,243 14,124
22,125 17,867 16,455 19,203 18,300 18,379 19,036 22,403 21,410 21,527 21,527 21,039 16,364 21,624
219 MATERIAL / BAHAN BAHAN BANGUNAN KAYU - - M' 7,403 6,730 5,852 5,028 4,373 4,061 3,531
5,531 4,467 4,114 4,801 4,575 4,595 4,759 5,601 5,352 5,382 5,382 5,260 4,091 5,406
220 MATERIAL / BAHAN BAHAN BANGUNAN KAYU - - Batang 37,014 33,649 29,260 26,818 23,320 27,071 23,540
29,500 29,778 23,934 27,204 23,931 25,448 28,554 28,804 35,173 26,140 26,140 30,056 23,207 28,832
221 MATERIAL / BAHAN BAHAN BANGUNAN KAYU Dolken Kayu Ø 8-10/400 cm - - Batang 29,611 26,919 23,408 22,125 20,114 17,490 17,867 16,243 14,124 16,455 19,203 18,300 18,379 19,036 22,403 21,410 21,527 21,527 21,039 16,364 21,624
222 MATERIAL / BAHAN BAHAN BANGUNAN KAYU Dolken Kayu Ø 8-10/400 cm - - Batang 29,611 26,919 23,408 22,125 20,114 17,490 17,867 16,243 14,124 16,455 19,203 18,300 18,379 19,036 22,403 21,410 21,527 21,527 21,039 16,364 21,624
223 MATERIAL / BAHAN BAHAN BANGUNAN IJUK Ijuk - - Kg 32,572 29,611 25,749 33,925 30,841 26,818 34,245 31,132 27,071 32,909 35,205 34,840 32,517 36,486 36,806 35,173 49,427 49,427 34,565 37,638 34,598
224 MATERIAL / BAHAN BAHAN BANGUNAN PLYWOOD - - Lembar 74,028 67,298 58,520 73,750 64,130 67,678 58,850
81,125 74,445 82,273 86,540 77,423 80,199 71,990 72,011 99,402 76,880 76,880 75,141 81,820 86,496
225 MATERIAL / BAHAN BAHAN BANGUNAN PLYWOOD - - Lembar 96,237 87,488 76,076 93,863 81,620 87,981 76,505
103,249 96,779 115,182 108,175 92,908 106,033 109,456 98,341 107,048 107,633 107,633 92,355 108,003 115,328
226 MATERIAL / BAHAN BAHAN BANGUNAN PLYWOOD - - Lembar 115,483 104,985 91,291 113,977 99,110 121,820 105,930
125,375 134,001 143,603 133,139 147,104 120,170 134,837 136,020 183,511 133,772 133,772 165,310 147,276 259,487
227 MATERIAL / BAHAN BAHAN BANGUNAN PLYWOOD - - Lembar 170,264 154,786 134,596 174,317 151,580 182,730 158,895
191,749 201,003 186,983 332,847 192,854 176,721 199,875 200,029 321,144 196,255 196,255 211,898 229,097 202,544
228 MATERIAL / BAHAN BAHAN BANGUNAN PLYWOOD - - Lembar 244,292 222,084 193,116 348,634 303,160 236,872 205,975
383,497 260,559 261,776 274,598 309,692 230,444 325,194 320,045 361,461 261,393 261,393 234,440 294,553 304,177
229 MATERIAL / BAHAN BAHAN BANGUNAN PLYWOOD - - Lembar 335,952 305,411 265,574 321,816 279,840 284,246 247,170
353,998 312,670 351,528 416,059 346,293 303,960 364,851 363,106 344,084 356,166 356,166 341,004 371,315 403,646
230 MATERIAL / BAHAN BAHAN BANGUNAN PLYWOOD - - Lembar 392,348 356,680 310,156 375,452 326,480 365,459 317,790
412,997 402,004 388,924 441,022 387,115 339,303 407,682 400,056 382,315 385,241 385,241 369,420 441,829 504,558
231 MATERIAL / BAHAN BAHAN BANGUNAN PLYWOOD Plywood 9 mm - - Lembar 170,264 154,786 134,596 191,749 174,317 151,580 201,003 182,730 158,895 186,983 332,847 192,854 176,721 199,875 200,029 321,144 196,255 196,255 211,898 229,097 202,544
232 MATERIAL / BAHAN BAHAN BANGUNAN PLYWOOD Plywood 12 mm - - Lembar 244,292 222,084 193,116 383,497 348,634 303,160 260,559 236,872 205,975 261,776 274,598 309,692 230,444 325,194 320,045 361,461 261,393 261,393 234,440 294,553 304,177
233 MATERIAL / BAHAN BAHAN BANGUNAN TEAKWOOD - - Lembar 176,187 160,170 139,278 160,908 139,920 172,762 150,228
176,999 190,038 179,504 204,701 181,592 168,238 191,944 192,027 308,910 218,061 218,061 178,836 194,733 177,185
234 MATERIAL / BAHAN BAHAN BANGUNAN TEAKWOOD - - Lembar 174,975 159,068 138,320 167,613 145,750 257,175 223,630
184,374 282,892 284,214 349,490 288,577 291,235 306,158 328,047 308,910 307,522 307,522 297,558 310,917 299,852
235 MATERIAL / BAHAN BAHAN BANGUNAN TEAKWOOD - - Lembar 118,444 107,677 93,632 101,908 88,616 108,284 94,160
112,099 119,112 97,232 99,855 100,650 91,895 112,629 104,015 122,341 99,945 99,945 112,712 106,367 122,667
236 MATERIAL / BAHAN BAHAN BANGUNAN PLAFOND - - Lembar 96,237 87,488 76,076 93,863 81,620 108,284 94,160
103,249 119,112 112,190 133,139 116,135 100,378 111,042 113,617 114,695 119,933 119,933 101,440 114,548 115,328
237 MATERIAL / BAHAN BAHAN BANGUNAN PLAFOND Textille tape - - Kg 29,611 26,919 23,408 30,975 28,159 24,486 31,268 28,425 24,717 31,414 36,614 31,673 32,079 33,313 33,605 32,115 32,290 32,290 30,808 34,365 34,074
238 MATERIAL / BAHAN BAHAN BANGUNAN PLAFOND Cornice @5 Kg - - Zak 103,639 94,217 81,928 117,999 107,272 93,280 126,557 115,052 100,045 106,070 121,489 116,135 100,378 112,629 120,017 131,516 119,206 119,206 106,701 130,912 122,536
239 MATERIAL / BAHAN BAHAN BANGUNAN PLAFOND List Gypsum Board - - M2 37,014 33,649 29,260 35,400 32,182 27,984 35,734 32,485 28,248 37,397 72,621 37,303 46,783 44,994 38,405 38,232 37,798 37,798 36,068 40,911 36,040
240 MATERIAL / BAHAN BAHAN BANGUNAN PLAFOND List Plafond Kayu 1 (Uk. 4 m) - - Batang 35,533 32,303 28,090 29,500 26,818 23,320 29,778 27,071 23,540 29,917 41,606 23,226 46,783 31,726 36,806 38,232 36,903 36,903 29,305 42,547 30,274
241 MATERIAL / BAHAN BAHAN BANGUNAN PLAFOND List Plafond Kayu 3/5 (Uk. 4 m) - - Batang 24,429 22,209 19,312 38,350 34,863 30,316 38,712 35,192 30,602 29,917 44,934 30,969 36,758 39,658 41,606 38,232 46,128 46,128 43,582 49,092 38,924
242 MATERIAL / BAHAN BAHAN BANGUNAN PLAFOND Eternit uk. 1 x 1 Meter - - Lembar 37,014 33,649 29,260 29,500 26,818 23,320 52,112 47,375 41,195 29,917 33,284 30,969 28,275 31,726 32,005 30,585 31,982 31,982 30,056 38,679 36,040
243 MATERIAL / BAHAN BAHAN BANGUNAN PLAFOND Rangka Plafond Mental Furing - - M2 74,028 67,298 58,520 73,750 67,045 58,300 74,445 67,678 58,850 74,793 83,212 77,423 70,688 79,316 80,011 76,463 79,956 79,956 75,141 81,820 72,080
244 MATERIAL / BAHAN BAHAN BANGUNAN BAMBU Bambu Kecil (Uk. 6 m) - - Batang 29,611 26,919 23,408 29,500 26,818 23,320 29,033 26,394 22,951 29,917 34,949 30,125 28,275 32,520 33,605 30,585 30,752 30,752 29,305 37,638 43,248
245 MATERIAL / BAHAN BAHAN BANGUNAN BAMBU Bambu Besar (Uk. 6 m) - - Batang 66,626 60,569 52,668 56,050 50,954 44,308 56,578 51,435 44,726 55,347 66,569 58,419 53,723 63,452 60,809 76,463 61,504 61,504 57,107 62,183 72,080
246 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Genteng Buleleng - - Buah 3,109 2,826 2,458 3,688 3,352 2,915 3,723 3,384 2,943 7,180 3,495 2,680 3,110 3,331 3,520 4,588 3,518 3,518 3,126 3,273 3,604
247 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Genteng Biasa - - Buah 3,109 2,826 2,458 2,360 2,145 1,865 3,871 3,519 3,060 2,992 3,495 2,394 3,251 24,746 4,001 3,211 2,907 2,907 3,126 2,631 2,883
248 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Genteng Kodok - - Buah 4,145 3,768 3,277 3,688 3,352 2,915 5,658 5,144 4,473 3,740 4,827 2,680 3,958 4,760 4,801 3,823 5,117 5,117 3,126 4,091 3,892
249 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Genteng Keramik Morando - - Buah 6,218 5,653 4,915 7,375 6,705 5,830 6,700 6,091 5,297 5,983 6,491 7,038 7,069 6,345 8,002 6,117 7,196 7,196 5,861 7,364 5,766
250 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Genteng Beton - - Buah 6,070 5,518 4,799 5,900 5,364 4,664 5,956 5,414 4,708 7,480 6,823 7,038 5,655 6,504 6,401 6,270 7,269 7,269 7,515 8,183 6,487
251 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Genteng Keramik Natural (Setara KIA) - - Buah 18,507 16,825 14,630 14,080 12,243 12,858 11,181
15,488 14,144 14,959 15,977 18,440 13,431 15,070 16,002 19,881 15,992 15,992 17,761 16,364 14,416
252 MATERIAL / BAHAN BAHAN BANGUNAN ATAP - - Buah 23,689 21,535 18,726 22,125 19,239 22,334 19,421
24,338 24,567 14,210 27,204 24,635 23,327 26,174 26,404 24,468 26,140 26,140 21,791 26,182 24,508
253 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Genteng Metal Biasa - - Buah 53,300 48,455 42,134 45,725 41,568 36,146 49,134 44,668 38,841 43,843 61,577 49,269 53,016 44,417 60,008 59,642 58,429 58,429 57,859 57,275 54,781
254 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Genteng Metal Zincalume - - Buah 54,781 49,801 43,305 50,150 45,591 39,644 55,090 50,082 43,549 60,814 72,394 57,716 52,310 48,383 59,209 65,759 72,687 72,687 75,141 57,275 57,664
255 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Genteng Metal Zincalume motif pasir - - Buah 143,614 130,559 113,529 147,499 134,090 116,600 145,913 132,648 115,346 145,099 161,431 147,808 138,549 158,631 160,023 149,867 153,761 153,761 147,276 157,095 160,017
256 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Genteng Palentong - - Buah 4,442 4,038 3,512 5,162 4,693 4,081 5,211 4,737 4,119 5,235 5,326 4,786 5,019 5,076 5,681 4,894 5,757 5,757 4,659 5,073 5,045
257 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Genteng Palentong Super - - Buah 4,738 4,307 3,745 5,162 4,693 4,081 4,913 4,467 3,884 5,235 5,326 4,927 5,019 5,552 5,681 4,894 5,815 5,815 6,913 5,400 5,045
258 MATERIAL / BAHAN BAHAN BANGUNAN ATAP - - Buah 127,328 115,753 100,654 116,659 101,442 119,112 103,576
128,325 131,024 130,141 151,446 135,139 123,704 142,768 140,019 134,575 138,105 138,105 131,496 142,368 136,952
259 MATERIAL / BAHAN BAHAN BANGUNAN ATAP - - Buah 121,406 110,369 95,973 113,977 99,110 115,052 100,045
125,375 126,557 131,636 145,621 130,212 119,463 136,423 136,020 134,575 133,744 133,744 132,248 144,004 129,743
260 MATERIAL / BAHAN BAHAN BANGUNAN ATAP - - Buah 112,522 102,293 88,950 117,999 102,608 102,870 89,452
129,799 113,157 127,149 123,218 117,543 109,566 120,560 124,017 134,575 120,660 120,660 114,214 124,367 129,743
261 MATERIAL / BAHAN BAHAN BANGUNAN ATAP - - Buah 76,989 69,990 60,861 67,045 58,300 73,092 63,558
73,750 80,401 77,785 106,511 81,646 75,636 87,248 88,013 73,404 89,987 89,987 87,164 86,730 82,171
262 MATERIAL / BAHAN BAHAN BANGUNAN ATAP - - lembar 91,794 83,450 72,565 117,999 102,608 86,627 75,328
129,799 95,290 167,537 102,414 105,577 113,615 103,111 104,015 99,402 145,374 145,374 96,180 103,094 98,028
263 MATERIAL / BAHAN BAHAN BANGUNAN ATAP - - lembar 108,081 98,256 85,440 84,477 73,458 101,517 88,275
92,925 111,668 97,232 109,840 114,023 19,793 118,974 120,017 114,695 159,911 159,911 111,209 119,458 112,444
264 MATERIAL / BAHAN BAHAN BANGUNAN ATAP - - lembar 140,653 127,867 111,188 87,159 75,790 132,648 115,346
95,875 145,913 112,190 161,431 147,808 138,549 158,631 160,023 152,926 167,180 167,180 147,276 157,095 151,368
265 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Atap Fiber Polycarbonat tebal 4-5 mm - - M2 219,122 199,202 173,219 201,135 174,900 205,740 178,904
221,249 226,314 221,388 249,635 224,825 214,892 245,879 243,234 226,330 230,641 230,641 226,926 243,825 230,655
266 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Atap Onduline (Uk. 95 x 200 cm) - - lembar 217,642 197,857 172,049 228,624 207,840 180,730 150,380 136,709 118,877 224,379 261,285 208,339 141,376 163,391 160,023 230,919 210,792 210,792 156,293 237,279 151,368
267 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Karpet Talang L= 50 cm - - M' 22,209 20,190 17,556 37,652 34,229 29,765 23,822 21,657 18,832 23,186 29,956 28,154 22,620 31,726 25,604 43,375 24,602 24,602 21,791 24,547 28,832
268 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Karpet Talang L = 80 cm - - M' 29,611 26,919 23,408 55,781 50,710 44,096 37,223 33,839 29,425 37,397 44,934 35,192 42,413 36,486 33,605 57,834 36,343 36,343 28,554 36,001 38,924
269 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Listplank Metal (Uk 200 x 2440 mm) - - Buah 76,989 69,990 60,861 48,675 44,250 38,478 91,500 83,182 72,332 53,851 55,752 49,269 80,199 52,349 51,207 39,761 58,429 58,429 78,147 78,547 50,456
270 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Listplank GRC (Uk 200 x 2440 mm) - - Keping 66,626 60,569 52,668 98,825 89,841 78,122 104,223 94,749 82,390 103,242 88,013 84,462 84,826 103,111 88,013 86,751 87,224 87,224 82,656 114,548 100,912
271 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Talang Paralon - - Buah 148,056 134,596 117,040 85,549 77,772 67,628 96,779 87,981 76,505 89,752 105,906 168,923 93,565 87,248 96,014 137,633 84,569 84,569 142,085 98,184 82,171
272 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Klem Talang Paralon - - Buah 11,199 10,181 8,853 14,750 13,409 11,660 11,911 10,828 9,416 21,214 8,321 7,743 86,882 9,518 10,402 14,458 9,914 9,914 10,971 12,377 12,975
273 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Fiber Gelombang Transparan - - Lembar 19,248 17,498 15,216 36,875 33,523 29,150 38,712 35,192 30,602 38,892 41,606 40,120 63,620 39,658 40,006 41,291 41,516 41,516 49,730 52,602 68,148
274 MATERIAL / BAHAN BAHAN BANGUNAN ATAP Rangka Atap Baja Ringan - - M2 185,070 168,245 146,300 225,674 205,158 178,398 230,781 209,801 182,435 228,868 244,835 236,492 216,306 242,706 244,835 237,036 242,774 242,774 229,932 278,189 256,237
275 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Bubungan Genteng Kodok - - Buah 7,403 6,730 5,852 7,375 6,705 5,830 11,911 10,828 9,416 10,472 6,241 5,349 4,948 9,518 6,401 9,176 11,194 11,194 8,526 8,183 10,092
276 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Bubungan Genteng Beton Biasa - - Buah 12,585 11,441 9,949 13,275 12,069 10,494 12,953 11,776 10,240 13,463 14,978 13,373 12,300 14,277 13,922 9,176 15,376 15,376 10,520 12,273 14,416
277 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Bubungan Keramik Natural (Setara KIA) - - Buah 37,014 33,649 29,260 34,863 30,316 35,192 30,602
38,350 38,712 38,892 44,934 40,120 36,758 42,038 41,606 39,761 39,978 39,978 37,571 39,274 39,644
278 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN - - Buah 38,494 34,995 30,430 36,205 31,482 37,899 32,956
39,825 41,689 40,389 46,598 40,120 38,172 43,623 43,207 40,526 41,516 41,516 36,068 40,911 41,086
279 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Bubungan Keramik Morando - - Buah 19,248 17,498 15,216 19,175 17,432 15,158 18,612 16,920 14,713 19,447 22,468 19,990 18,379 21,415 20,804 20,645 19,989 19,989 18,034 19,637 20,182
280 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Bubungan Genteng Kodok - - Buah 7,403 6,730 5,852 7,375 6,705 5,830 11,911 10,828 9,416 10,472 6,241 5,349 4,948 9,518 6,401 9,176 11,194 11,194 8,526 8,183 10,092
281 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Bubungan Genteng Tanah Glazur - - Buah 5,479 4,980 4,331 5,900 5,364 4,664 5,956 5,414 4,708 8,227 5,825 5,913 4,948 8,549 6,401 7,952 7,269 7,269 6,011 8,183 5,766
282 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Bubungan Genteng Metal - - Buah 31,092 28,266 24,579 32,075 29,159 25,355 37,223 33,839 29,425 31,414 36,614 35,192 35,345 39,658 35,205 36,702 32,290 32,290 37,571 40,911 30,274
283 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Alumunium Foil Double Side - - M2 51,820 47,109 40,964 48,675 44,250 38,478 50,623 46,021 40,018 49,364 52,808 51,803 49,482 55,521 56,008 50,466 53,817 53,817 51,096 61,886 36,040
284 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Alumunium tape (Won Tape) - - M2 48,859 44,417 38,624 50,150 45,591 39,644 50,623 46,021 40,018 47,868 56,008 50,184 47,361 52,349 53,607 49,701 49,203 49,203 48,842 54,819 54,781
285 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Ujung Bubungan Genteng Keramik - - Buah 142,133 129,212 112,358 147,499 134,090 116,600 145,913 132,648 115,346 145,099 166,423 147,808 137,842 161,804 160,023 155,984 153,761 153,761 151,034 159,549 151,368
286 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Nok Genteng Keramik Kanmuri Hijau - - Buah 39,976 36,341 31,601 39,825 36,205 31,482 41,689 37,899 32,956 40,389 46,598 41,668 38,172 44,417 43,207 41,291 41,516 41,516 36,068 40,911 50,456
287 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Nok Genteng Keramik Kanmuri Natural - - Buah 23,689 21,535 18,726 22,125 19,239 22,334 19,421
24,338 24,567 23,934 28,292 24,776 23,327 26,174 32,005 24,774 41,516 41,516 21,791 32,728 41,807
288 MATERIAL / BAHAN BAHAN BANGUNAN BUBUNGAN Nok Onduline - - Buah 112,522 102,293 88,950 125,375 113,977 99,110 126,557 115,052 100,045 124,157 144,788 130,212 120,170 136,423 136,020 129,223 116,858 116,858 112,712 122,731 109,561
289 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos BJLS 027 (Lebar 80 cm) - - M' 10,364 9,422 8,193 10,057 8,745 9,598 8,346
11,062 10,558 11,219 12,482 23,226 10,038 22,497 13,616 10,858 13,083 13,083 10,520 12,377 25,949
290 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos BJLS 029 (Lebar 80 cm) - - M' 11,104 10,094 8,778 10,727 9,328 10,287 8,945
11,800 11,315 11,967 12,981 11,966 10,744 14,998 14,373 12,387 13,810 13,810 10,520 13,151 27,391
291 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos BJLS 030 (Lebar 80 cm) - - M' 20,997 19,088 16,598 10,727 9,328 10,828 9,416
11,800 11,911 11,967 13,480 30,969 11,310 23,997 15,129 12,234 15,992 15,992 14,208 13,924 14,416
292 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos BJLS 038 (Lebar 80 cm) - - M' 22,209 20,190 17,556 20,114 17,490 27,071 23,540
22,125 29,778 22,438 26,628 28,154 21,207 26,996 27,233 22,939 29,075 29,075 22,543 122,731 28,832
293 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos BJLS 045 (Lebar 80 cm) - - M' 28,131 25,574 22,238 24,136 20,988 27,071 23,540
26,550 29,778 28,422 33,284 39,416 27,568 31,091 34,798 29,820 31,982 31,982 28,417 130,912 30,274
294 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos BJLS 055 (Lebar 80 cm) - - M' 34,995 31,814 27,664 24,136 20,988 29,778 25,894
26,550 32,756 32,909 38,278 33,221 27,286 32,995 37,824 33,644 33,827 33,827 35,521 139,095 33,157
295 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos BJLS 090 (Lebar 80 cm) - - M' 44,417 40,379 35,112 40,227 34,980 47,375 41,195
44,250 52,112 52,356 59,913 52,084 46,655 38,071 60,518 53,525 53,817 53,817 43,582 147,276 53,339
296 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos BLJS 060 (Lebar 80 cm) - - M' 39,195 35,631 30,984 28,159 24,486 33,839 29,425
30,975 37,223 37,397 29,956 36,107 33,930 37,495 45,388 38,232 41,516 41,516 39,784 163,640 37,481
297 MATERIAL / BAHAN BAHAN BANGUNAN - - M' 83,988 76,353 66,394 45,591 39,644 45,479 39,547
50,150 50,027 49,364 56,583 50,677 45,240 59,991 57,492 51,230 52,335 52,335 85,251 52,365 50,456
298 MATERIAL / BAHAN BAHAN BANGUNAN - - M' 10,364 9,422 8,193 8,716 7,579 10,151 8,827
9,588 11,167 9,723 12,149 10,699 9,897 11,422 12,860 12,234 53,817 53,817 9,017 98,184 10,812
299 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos L = 40 cm - - M' 32,572 29,611 25,749 29,500 25,652 29,778 25,894
32,450 32,756 26,926 26,628 33,221 21,207 28,554 37,824 43,375 43,053 43,053 52,599 36,001 33,157
300 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos L = 45 cm - - M' 35,533 32,303 28,090 32,182 27,984 32,485 28,248
35,400 35,734 35,901 39,942 37,163 32,517 31,726 42,363 53,525 43,612 43,612 36,068 40,911 36,040
301 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos L = 55 cm - - M' 29,611 26,919 23,408 34,863 30,316 35,192 30,602
38,350 38,712 29,917 36,614 39,416 28,275 34,899 45,388 61,170 53,817 53,817 52,599 40,911 39,644
302 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos L = 60 cm - - M' 53,193 48,357 42,049 40,227 34,980 43,314 37,664
44,250 47,645 41,884 39,942 42,231 35,345 36,486 48,414 65,063 50,881 50,881 42,831 49,092 43,248
303 MATERIAL / BAHAN BAHAN BANGUNAN Seng plat polos L = 88 cm - - M' 48,993 44,539 38,730 40,227 34,980 54,142 47,080
44,250 59,556 44,876 49,927 44,483 49,482 55,521 52,953 72,292 58,150 58,150 43,582 61,886 50,456
304 MATERIAL / BAHAN BAHAN BANGUNAN PIPA PARALON TIPIS Pipa Paralon diameter. 0,50" - - 4 M / Batang 25,170 22,882 19,897 29,500 26,818 23,320 35,192 31,993 27,820 29,917 39,942 30,969 35,345 35,994 30,259 38,232 37,672 37,672 34,565 40,911 30,274
305 MATERIAL / BAHAN BAHAN BANGUNAN PIPA PARALON TIPIS Pipa Paralon diameter 0,75" - - 4 M / Batang 37,014 33,649 29,260 36,875 33,523 29,150 49,269 44,790 38,948 37,397 49,927 46,454 46,783 44,994 36,806 53,525 47,974 47,974 45,085 49,092 43,248
306 MATERIAL / BAHAN BAHAN BANGUNAN PIPA PARALON TIPIS Pipa Paralon diameter 1,00" - - 4 M / Batang 51,820 47,109 40,964 51,625 46,932 40,810 63,346 57,587 50,076 52,356 66,569 53,493 60,149 59,991 60,518 76,463 95,332 95,332 52,599 100,564 44,690
307 MATERIAL / BAHAN BAHAN BANGUNAN PIPA PARALON TIPIS Pipa Paralon diameter. 0,50" - - M 25,170 22,882 19,897 29,500 26,818 23,320 35,192 31,993 27,820 29,917 39,942 30
382 MATERIAL / BAHAN BAHAN BANGUNAN ELBOW Elbow PVC diameter (0,50") - - Buah 4,442 4,038 3,512 4,426 4,023 3,498 8,933 8,121 7,062 7,779 6,657 4,645 7,775 6,345 8,002 7,647 17,445 17,445 5,683 4,910 8,650
383 MATERIAL / BAHAN BAHAN BANGUNAN ELBOW Elbow PVC diameter (0,75") - - Buah 7,403 6,730 5,852 10,325 9,387 8,162 10,423 9,475 8,239 10,890 8,321 7,743 7,069 7,932 8,002 7,647 21,806 21,806 7,515 11,455 12,975
384 MATERIAL / BAHAN BAHAN BANGUNAN ELBOW Elbow PVC diameter (1,00") - - Buah 14,806 13,460 11,704 14,750 13,409 11,660 13,401 12,182 10,593 14,001 9,985 14,710 9,613 15,070 11,202 10,705 29,075 29,075 18,471 16,364 18,741
385 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 63 x 50 x 63 mm - - Buah 621,834 565,303 491,568 576,587 501,380 580,673 504,933
634,246 638,741 661,171 707,299 654,577 603,678 691,631 683,297 654,523 661,171 661,171 643,207 700,381 648,717
386 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 90 x 80 x 90 mm - - Buah 814,306 740,278 643,720 757,609 658,790 762,049 662,651
833,370 838,254 863,412 931,972 862,915 791,708 907,369 896,126 859,443 872,243 872,243 843,083 919,659 864,956
387 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 90 x 50 x 90 mm - - Buah 756,565 687,786 598,075 703,973 612,150 706,553 614,394
774,370 777,208 801,184 865,401 800,555 735,157 842,331 832,117 798,273 799,556 799,556 781,466 854,203 792,877
388 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 110 x 100 x 110 mm - - Buah 935,711 850,647 739,693 871,585 757,900 873,040 759,165
958,744 960,344 1,011,203 1,065,109 1,072,661 907,636 1,040,619 1,027,344 984,842 1,017,617 1,017,617 966,314 1,055,481 973,076
389 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 110 x 80 x 110 mm - - Buah 876,489 796,808 692,877 811,245 705,430 817,544 710,908
892,369 899,299 933,418 998,540 926,262 848,258 973,994 960,135 922,143 922,565 922,565 904,698 988,388 915,413
390 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 110 x 50 x 110 mm - - Buah 876,489 796,808 692,877 811,245 705,430 817,544 710,908
892,369 899,299 933,418 998,540 926,262 848,258 973,994 960,135 925,202 922,565 922,565 904,698 988,388 2,162,391
391 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 160 x 150 x 160 mm - - Buah 2,072,778 1,884,344 1,638,560 1,944,305 1,690,700 1,930,162 1,678,402
2,138,736 2,123,179 2,224,647 2,359,884 2,190,369 2,007,545 2,301,736 2,272,320 2,179,194 2,369,593 2,369,593 2,138,513 2,336,785 1,931,736
392 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 160 x 100 x 160 mm - - Buah 1,850,695 1,682,450 1,463,000 1,716,352 1,492,480 1,729,837 1,504,206
1,887,987 1,902,821 2,022,406 2,113,577 1,956,692 1,809,618 2,062,203 2,048,288 1,957,451 2,180,607 2,180,607 1,916,096 2,092,961 2,234,471
393 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 160 x 80 x 160 mm - - Buah 2,117,195 1,924,723 1,673,672 1,971,123 1,714,020 1,978,890 1,720,774
2,168,235 2,176,779 2,333,546 2,416,467 2,238,230 2,064,095 2,358,844 2,336,329 2,234,247 2,306,411 2,306,411 2,191,112 2,394,060 2,090,311
394 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 200 x 200 x 200 mm - - Buah 2,013,556 1,830,506 1,591,744 1,877,260 1,632,400 1,876,020 1,631,322
2,064,986 2,063,622 2,177,976 2,291,650 2,111,538 1,965,132 2,236,697 2,224,313 2,119,552 2,173,338 2,173,338 2,078,401 2,269,693 1,816,408
395 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 200 x 150 x 200 mm - - Buah 1,732,251 1,574,773 1,369,368 1,609,080 1,399,200 1,625,614 1,413,577
1,769,988 1,788,175 1,866,836 1,985,431 1,842,668 1,693,689 1,936,885 1,920,270 1,835,110 1,889,859 1,889,859 1,800,378 1,963,685 1,614,585
396 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 200 x 100 x 200 mm - - Buah 1,551,623 1,410,566 1,226,579 1,474,990 1,282,600 1,444,238 1,255,859
1,622,489 1,588,662 1,633,482 1,764,089 1,638,553 1,504,245 1,722,733 1,702,639 1,631,719 1,744,486 1,744,486 1,600,504 1,747,679 1,513,674
397 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 200 x 80 x 200 mm - - Buah 1,437,620 1,306,928 1,136,459 1,340,900 1,166,000 1,340,015 1,165,230
1,474,990 1,474,016 1,555,697 1,637,606 1,520,307 1,395,386 1,597,415 1,579,423 1,513,966 1,599,112 1,599,112 1,484,786 1,621,677 3,603,985
398 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 250 x 250 x 250 mm - - Buah 3,360,862 3,055,329 2,656,808 3,131,002 2,722,610 3,141,590 2,731,817
3,444,102 3,455,749 3,578,103 3,827,738 3,564,276 3,272,864 3,745,278 3,704,521 3,547,880 4,215,840 4,215,840 3,480,531 3,803,003 5,297,858
399 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 315 x 300 x 315 mm - - Buah 5,078,307 4,616,643 4,014,472 4,693,150 4,081,000 4,733,365 4,115,969
5,162,465 5,206,701 5,444,940 5,783,213 5,368,937 4,931,209 5,642,505 5,600,788 5,352,405 5,541,649 5,541,649 5,243,340 5,727,414 4,065,295
400 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 315 x 200 x 315 mm - - Buah 3,893,862 3,539,875 3,078,152 3,620,430 3,148,200 3,627,514 3,154,360
3,982,473 3,990,265 4,122,597 4,433,519 4,114,684 3,778,992 4,325,868 4,277,402 4,096,884 4,244,915 4,244,915 4,018,541 4,390,473 3,676,065
401 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 315 x 150 x 315 mm - - Buah 3,494,112 3,176,466 2,762,144 3,352,250 2,915,000 3,264,763 2,838,924
3,687,475 3,591,239 3,733,673 3,994,162 3,702,230 3,400,103 3,892,805 3,848,542 3,687,043 3,823,331 3,823,331 3,615,785 3,951,916 3,315,666
402 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 315 x 100 x 315 mm - - Buah 3,183,195 2,893,814 2,516,360 2,949,980 2,565,200 2,972,396 2,584,692
3,244,978 3,269,635 3,422,533 3,631,358 3,371,422 3,103,212 3,543,817 3,520,495 3,356,723 3,481,703 3,481,703 3,292,679 3,596,816 3,315,666
403 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 63 x 50 x 63 mm - - Buah 621,834 565,303 491,568 576,587 501,380 580,673 504,933
634,246 638,741 661,171 707,299 654,577 603,678 691,631 683,297 654,523 661,171 661,171 643,207 700,381 648,717
404 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 90 x 80 x 90 mm - - Buah 814,306 740,278 643,720 757,609 658,790 762,049 662,651
833,370 838,254 863,412 931,972 862,915 791,708 907,369 896,126 859,443 872,243 872,243 843,083 919,659 864,956
405 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 90 x 50 x 90 mm - - Buah 756,565 687,786 598,075 703,973 612,150 706,553 614,394
774,370 777,208 801,184 865,401 800,555 735,157 842,331 832,117 798,273 799,556 799,556 781,466 854,203 792,877
406 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 110 x 100 x 110 mm - - Buah 935,711 850,647 739,693 871,585 757,900 873,040 759,165
958,744 960,344 1,011,203 1,065,109 1,072,661 907,636 1,040,619 1,027,344 984,842 1,017,617 1,017,617 966,314 1,055,481 973,076
407 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 110 x 80 x 110 mm - - Buah 876,489 796,808 692,877 811,245 705,430 817,544 710,908
892,369 899,299 933,418 998,540 926,262 848,258 973,994 960,135 922,143 922,565 922,565 904,698 988,388 915,413
408 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 110 x 50 x 110 mm - - Buah 876,489 796,808 692,877 811,245 705,430 817,544 710,908
892,369 899,299 933,418 998,540 926,262 848,258 973,994 960,135 925,202 922,565 922,565 904,698 988,388 2,162,391
409 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 160 x 150 x 160 mm - - Buah 2,072,778 1,884,344 1,638,560 1,944,305 1,690,700 1,930,162 1,678,402
2,138,736 2,123,179 2,224,647 2,359,884 2,190,369 2,007,545 2,301,736 2,272,320 2,179,194 2,369,593 2,369,593 2,138,513 2,336,785 1,931,736
410 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 160 x 100 x 160 mm - - Buah 1,850,695 1,682,450 1,463,000 1,716,352 1,492,480 1,729,837 1,504,206
1,887,987 1,902,821 2,022,406 2,113,577 1,956,692 1,809,618 2,062,203 2,048,288 1,957,451 2,180,607 2,180,607 1,916,096 2,092,961 2,234,471
411 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 160 x 80 x 160 mm - - Buah 2,117,195 1,924,723 1,673,672 1,971,123 1,714,020 1,978,890 1,720,774
2,168,235 2,176,779 2,333,546 2,416,467 2,238,230 2,064,095 2,358,844 2,336,329 2,234,247 2,306,411 2,306,411 2,191,112 2,394,060 2,090,311
412 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 200 x 200 x 200 mm - - Buah 2,013,556 1,830,506 1,591,744 1,877,260 1,632,400 1,876,020 1,631,322
2,064,986 2,063,622 2,177,976 2,291,650 2,111,538 1,965,132 2,236,697 2,224,313 2,119,552 2,173,338 2,173,338 2,078,401 2,269,693 1,816,408
413 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 200 x 150 x 200 mm - - Buah 1,732,251 1,574,773 1,369,368 1,609,080 1,399,200 1,625,614 1,413,577
1,769,988 1,788,175 1,866,836 1,985,431 1,842,668 1,693,689 1,936,885 1,920,270 1,835,110 1,889,859 1,889,859 1,800,378 1,963,685 1,614,585
414 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 200 x 100 x 200 mm - - Buah 1,551,623 1,410,566 1,226,579 1,474,990 1,282,600 1,444,238 1,255,859
1,622,489 1,588,662 1,633,482 1,764,089 1,638,553 1,504,245 1,722,733 1,702,639 1,631,719 1,744,486 1,744,486 1,600,504 1,747,679 1,513,674
415 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 200 x 80 x 200 mm - - Buah 1,437,620 1,306,928 1,136,459 1,340,900 1,166,000 1,340,015 1,165,230
1,474,990 1,474,016 1,555,697 1,637,606 1,520,307 1,395,386 1,597,415 1,579,423 1,513,966 1,599,112 1,599,112 1,484,786 1,621,677 3,603,985
416 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 250 x 250 x 250 mm - - Buah 3,360,862 3,055,329 2,656,808 3,131,002 2,722,610 3,141,590 2,731,817
3,444,102 3,455,749 3,578,103 3,827,738 3,564,276 3,272,864 3,745,278 3,704,521 3,547,880 4,215,840 4,215,840 3,480,531 3,803,003 5,297,858
417 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 315 x 300 x 315 mm - - Buah 5,078,307 4,616,643 4,014,472 4,693,150 4,081,000 4,733,365 4,115,969
5,162,465 5,206,701 5,444,940 5,783,213 5,368,937 4,931,209 5,642,505 5,600,788 5,352,405 5,541,649 5,541,649 5,243,340 5,727,414 4,065,295
418 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 315 x 200 x 315 mm - - Buah 3,893,862 3,539,875 3,078,152 3,620,430 3,148,200 3,627,514 3,154,360
3,982,473 3,990,265 4,122,597 4,433,519 4,114,684 3,778,992 4,325,868 4,277,402 4,096,884 4,244,915 4,244,915 4,018,541 4,390,473 3,676,065
419 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 315 x 150 x 315 mm - - Buah 3,494,112 3,176,466 2,762,144 3,352,250 2,915,000 3,264,763 2,838,924
3,687,475 3,591,239 3,733,673 3,994,162 3,702,230 3,400,103 3,892,805 3,848,542 3,687,043 3,823,331 3,823,331 3,615,785 3,951,916 3,315,666
420 MATERIAL / BAHAN BAHAN BANGUNAN PVC TEE RR / FLANGES JOINT (INJ.) Diameter 315 x 100 x 315 mm - - Buah 3,183,195 2,893,814 2,516,360 2,949,980 2,565,200 2,972,396 2,584,692
3,244,978 3,269,635 3,422,533 3,631,358 3,371,422 3,103,212 3,543,817 3,520,495 3,356,723 3,481,703 3,481,703 3,292,679 3,596,816 3,315,666
421 MATERIAL / BAHAN BAHAN BANGUNAN DOP / CAP PVC SC Diameter 63 mm - - Buah 38,494 34,995 30,430 39,825 36,205 31,482 39,456 35,869 31,191 31,414 44,934 40,823 37,465 42,038 43,207 40,526 42,158 42,158 40,577 44,183 40,365
422 MATERIAL / BAHAN BAHAN BANGUNAN DOP / CAP PVC SC Diameter 90 mm - - Buah 62,183 56,530 49,157 63,425 57,659 50,138 64,023 58,203 50,611 67,314 71,562 66,161 60,085 68,212 68,010 65,759 68,325 68,325 63,118 65,456 64,872
423 MATERIAL / BAHAN BAHAN BANGUNAN DOP / CAP PVC SC Diameter 110 mm - - Buah 75,509 68,644 59,691 76,699 69,727 60,632 76,678 69,708 60,615 77,785 86,540 78,831 72,102 82,488 81,612 79,521 84,569 84,569 76,644 81,820 79,288
424 MATERIAL / BAHAN BAHAN BANGUNAN DOP / CAP PVC SC Diameter 160 mm - - Buah 162,861 148,056 128,744 162,249 147,499 128,260 160,802 146,183 127,116 164,545 183,066 164,700 152,687 174,494 176,025 165,160 169,137 169,137 162,305 176,732 165,784
425 MATERIAL / BAHAN BAHAN BANGUNAN DOP / CAP PVC RRJ Diameter 63 mm - - Buah 38,494 34,995 30,430 39,825 36,205 31,482 39,456 35,869 31,191 31,414 44,934 40,823 37,465 42,038 43,207 40,526 42,158 42,158 40,577 44,183 40,365
426 MATERIAL / BAHAN BAHAN BANGUNAN DOP / CAP PVC RRJ Diameter 90 mm - - Buah 62,183 56,530 49,157 63,425 57,659 50,138 64,023 58,203 50,611 67,314 71,562 66,161 60,085 68,212 68,010 65,759 68,325 68,325 63,118 65,456 64,872
427 MATERIAL / BAHAN BAHAN BANGUNAN DOP / CAP PVC RRJ Diameter 110 mm - - Buah 75,509 68,644 59,691 76,699 69,727 60,632 76,678 69,708 60,615 77,785 86,540 78,831 72,102 82,488 81,612 79,521 84,569 84,569 76,644 81,820 79,288
428 MATERIAL / BAHAN BAHAN BANGUNAN DOP / CAP PVC RRJ Diameter 160 mm - - Buah 162,861 148,056 128,744 162,249 147,499 128,260 160,802 146,183 127,116 164,545 183,066 164,700 152,687 174,494 176,025 165,160 169,137 169,137 162,305 176,732 165,784
429 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 63 mm - - Buah 38,494 34,995 30,430 39,825 36,205 31,482 39,456 35,869 31,191 31,414 44,934 40,823 37,465 42,038 43,207 40,526 42,158 42,158 40,577 44,183 40,365
430 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 90 mm - - Buah 62,183 56,530 49,157 63,425 57,659 50,138 64,023 58,203 50,611 67,314 71,562 66,161 60,085 68,212 68,010 65,759 68,325 68,325 63,118 65,456 64,872
431 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 110 mm - - Buah 75,509 68,644 59,691 76,699 69,727 60,632 76,678 69,708 60,615 77,785 86,540 78,831 72,102 82,488 81,612 79,521 84,569 84,569 76,644 81,820 79,288
432 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 160 mm - - Buah 162,861 148,056 128,744 162,249 147,499 128,260 160,802 146,183 127,116 164,545 183,066 164,700 152,687 174,494 176,025 165,160 169,137 169,137 162,305 176,732 165,784
433 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 200 mm - - Buah 2,271,173 2,064,703 1,795,394 2,315,734 2,105,213 1,830,620 2,327,159 2,115,599 1,839,651 2,333,546 2,579,563 2,400,115 2,202,644 2,522,233 2,493,151 2,388,702 2,478,623 2,478,623 2,342,897 2,559,336 2,367,097
434 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 250 mm - - Buah 3,224,651 2,931,501 2,549,131 3,296,603 2,996,912 2,606,010 3,303,881 3,003,528 2,611,763 3,290,898 3,692,935 3,406,615 3,128,660 3,580,302 3,541,299 3,391,895 3,536,945 3,536,945 3,327,243 3,636,090 3,360,356
435 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 315 mm - - Buah 6,514,446 5,922,224 5,149,760 6,711,205 6,101,095 5,305,300 6,692,629 6,084,208 5,290,615 6,731,381 7,510,688 6,901,914 6,337,905 7,254,196 7,201,013 6,870,959 7,166,928 7,166,928 6,738,645 7,363,818 6,808,649
436 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 63 x 50 mm - - Buah 389,387 353,988 307,816 398,247 362,043 314,820 399,027 362,751 315,436 403,883 459,328 411,891 377,475 433,063 432,061 409,841 425,364 425,364 402,756 438,556 403,646
437 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 90 x 80 mm - - Buah 605,548 550,498 478,694 619,496 563,178 489,720 622,362 565,784 491,986 620,783 715,621 641,063 588,126 674,182 665,694 637,701 705,063 705,063 626,676 682,381 634,301
438 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 110 x 100 mm - - Buah 883,892 803,539 698,729 907,119 824,654 717,090 905,254 822,958 715,616 897,518 1,043,474 931,892 856,741 981,926 969,736 929,789 962,374 962,374 912,212 996,571 922,620
439 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 160 x 150 mm - - Buah 1,437,620 1,306,928 1,136,459 1,474,990 1,340,900 1,166,000 1,474,016 1,340,015 1,165,230 1,465,945 1,697,518 1,513,269 1,395,386 1,597,415 1,600,225 1,512,437 1,563,640 1,563,640 1,454,730 1,621,677 1,513,674
440 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 200 x 200 mm - - Buah 2,271,173 2,064,703 1,795,394 2,315,734 2,105,213 1,830,620 2,327,159 2,115,599 1,839,651 2,318,587 3,806,103 2,400,115 2,202,644 2,522,233 2,493,151 2,388,702 2,471,355 2,471,355 2,342,897 2,559,336 2,378,630
441 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 250 x 250 mm - - Buah 3,224,651 2,931,501 2,549,131 3,318,728 3,017,025 2,623,500 3,303,881 3,003,528 2,611,763 3,290,898 3,806,103 3,406,615 3,128,660 3,580,302 3,541,299 3,391,895 3,518,046 3,518,046 3,327,243 3,636,090 3,358,914
442 MATERIAL / BAHAN BAHAN BANGUNAN PVC FLANGES SOCKET RR JOINT Diameter 315 x 300 mm - - Buah 6,514,446 5,922,224 5,149,760 6,637,455 6,034,050 5,247,000 6,692,629 6,084,208 5,290,615 6,664,068 7,710,396 6,968,075 6,337,905 7,252,609 7,201,013 6,870,959 7,196,003 7,196,003 6,738,645 7,363,818 6,775,492
443 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 63 mm - - Buah 38,494 34,995 30,430 36,205 31,482 35,869 31,191
39,825 39,456 31,414 44,934 40,823 37,465 42,038 43,207 40,526 42,158 42,158 40,577 44,183 40,365
444 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 90 mm - - Buah 62,183 56,530 49,157 57,659 50,138 58,203 50,611
63,425 64,023 67,314 71,562 66,161 60,085 68,212 68,010 65,759 68,325 68,325 63,118 65,456 64,872
445 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 110 mm - - Buah 75,509 68,644 59,691 69,727 60,632 69,708 60,615
76,699 76,678 77,785 86,540 78,831 72,102 82,488 81,612 79,521 84,569 84,569 76,644 81,820 79,288
446 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 160 mm - - Buah 162,861 148,056 128,744 147,499 128,260 146,183 127,116
162,249 160,802 164,545 183,066 164,700 152,687 174,494 176,025 165,160 169,137 169,137 162,305 176,732 165,784
447 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 200 mm - - Buah 2,271,173 2,064,703 1,795,394 2,105,213 1,830,620 2,115,599 1,839,651
2,315,734 2,327,159 2,333,546 2,579,563 2,400,115 2,202,644 2,522,233 2,493,151 2,388,702 2,478,623 2,478,623 2,342,897 2,559,336 2,367,097
448 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 250 mm - - Buah 3,224,651 2,931,501 2,549,131 2,996,912 2,606,010 3,003,528 2,611,763
3,296,603 3,303,881 3,290,898 3,692,935 3,406,615 3,128,660 3,580,302 3,541,299 3,391,895 3,536,945 3,536,945 3,327,243 3,636,090 3,360,356
449 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 315 mm - - Buah 6,514,446 5,922,224 5,149,760 6,101,095 5,305,300 6,084,208 5,290,615
6,711,205 6,692,629 6,731,381 7,510,688 6,901,914 6,337,905 7,254,196 7,201,013 6,870,959 7,166,928 7,166,928 6,738,645 7,363,818 6,808,649
450 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 63 mm - - Buah 38,494 34,995 30,430 36,205 31,482 35,869 31,191
39,825 39,456 31,414 44,934 40,823 37,465 42,038 43,207 40,526 42,158 42,158 40,577 44,183 40,365
451 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 90 mm - - Buah 62,183 56,530 49,157 57,659 50,138 58,203 50,611
63,425 64,023 67,314 71,562 66,161 60,085 68,212 68,010 65,759 68,325 68,325 63,118 65,456 64,872
452 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 110 mm - - Buah 75,509 68,644 59,691 69,727 60,632 69,708 60,615
76,699 76,678 77,785 86,540 78,831 72,102 82,488 81,612 79,521 84,569 84,569 76,644 81,820 79,288
453 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 160 mm - - Buah 162,861 148,056 128,744 147,499 128,260 146,183 127,116
162,249 160,802 164,545 183,066 164,700 152,687 174,494 176,025 165,160 169,137 169,137 162,305 176,732 165,784
454 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 200 mm - - Buah 2,271,173 2,064,703 1,795,394 2,105,213 1,830,620 2,115,599 1,839,651
2,315,734 2,327,159 2,333,546 2,579,563 2,400,115 2,202,644 2,522,233 2,493,151 2,388,702 2,478,623 2,478,623 2,342,897 2,559,336 2,367,097
455 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 250 mm - - Buah 3,224,651 2,931,501 2,549,131 2,996,912 2,606,010 3,003,528 2,611,763
3,296,603 3,303,881 3,290,898 3,692,935 3,406,615 3,128,660 3,580,302 3,541,299 3,391,895 3,536,945 3,536,945 3,327,243 3,636,090 3,360,356
456 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 315 mm - - Buah 6,514,446 5,922,224 5,149,760 6,101,095 5,305,300 6,084,208 5,290,615
6,711,205 6,692,629 6,731,381 7,510,688 6,901,914 6,337,905 7,254,196 7,201,013 6,870,959 7,166,928 7,166,928 6,738,645 7,363,818 6,808,649
457 MATERIAL / BAHAN BAHAN BANGUNAN TEDMOND/Tandon Air Fiber Kapasitas 500 - - Buah 1,258,473 1,144,066 994,840 1,401,241 1,273,855 1,107,700 1,196,538 1,087,762 945,880 1,346,276 1,414,599 1,191,124 1,372,765 1,439,793 1,360,191 1,452,796 1,330,170 1,330,170 1,207,721 1,309,123 2,090,311
458 MATERIAL / BAHAN BAHAN BANGUNAN TEDMOND/Tandon Air Fiber Kapasitas 1000 - - Buah 2,072,778 1,884,344 1,638,560 2,064,986 1,877,260 1,632,400 2,010,022 1,827,293 1,588,950 1,944,621 2,246,716 1,900,384 2,288,884 2,324,665 2,160,304 2,446,814 2,376,862 2,376,862 2,131,272 2,320,718 2,883,188
459 MATERIAL / BAHAN BAHAN BANGUNAN TEDMOND/Tandon Air Fiber Kapasitas 2000 - - Buah 4,059,415 3,690,378 3,209,024 3,687,475 3,352,250 2,915,000 4,011,922 3,647,202 3,171,480 3,889,243 4,160,585 3,519,230 4,241,292 3,965,775 4,387,526 4,281,924 4,288,527 4,288,527 4,120,459 4,486,722 4,901,420
460 MATERIAL / BAHAN BAHAN BANGUNAN TEDMOND/Tandon Air Pelampung Otomatis - - Buah 222,083 201,894 175,560 221,249 201,135 174,900 223,336 203,033 176,550 224,379 249,635 223,336 212,065 237,947 240,034 229,389 230,641 230,641 225,423 245,461 216,239
461 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 63 mm - - Buah 38,494 34,995 30,430 36,205 31,482 35,869 31,191
39,825 39,456 31,414 44,934 40,823 37,465 42,038 43,207 40,526 42,158 42,158 40,577 44,183 40,365
462 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 90 mm - - Buah 62,183 56,530 49,157 57,659 50,138 58,203 50,611
63,425 64,023 67,314 71,562 66,161 60,085 68,212 68,010 65,759 68,325 68,325 63,118 65,456 64,872
463 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 110 mm - - Buah 75,509 68,644 59,691 69,727 60,632 69,708 60,615
76,699 76,678 77,785 86,540 78,831 72,102 82,488 81,612 79,521 84,569 84,569 76,644 81,820 79,288
464 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 160 mm - - Buah 162,861 148,056 128,744 147,499 128,260 146,183 127,116
162,249 160,802 164,545 183,066 164,700 152,687 174,494 176,025 165,160 169,137 169,137 162,305 176,732 165,784
465 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 200 mm - - Buah 2,271,173 2,064,703 1,795,394 2,105,213 1,830,620 2,115,599 1,839,651
2,315,734 2,327,159 2,333,546 2,579,563 2,400,115 2,202,644 2,522,233 2,493,151 2,388,702 2,478,623 2,478,623 2,342,897 2,559,336 2,367,097
466 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 250 mm - - Buah 3,224,651 2,931,501 2,549,131 2,996,912 2,606,010 3,003,528 2,611,763
3,296,603 3,303,881 3,290,898 3,692,935 3,406,615 3,128,660 3,580,302 3,541,299 3,391,895 3,536,945 3,536,945 3,327,243 3,636,090 3,360,356
467 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 315 mm - - Buah 6,514,446 5,922,224 5,149,760 6,101,095 5,305,300 6,084,208 5,290,615
6,711,205 6,692,629 6,731,381 7,510,688 6,901,914 6,337,905 7,254,196 7,201,013 6,870,959 7,166,928 7,166,928 6,738,645 7,363,818 6,808,649
468 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 63 mm - - Buah 38,494 34,995 30,430 36,205 31,482 35,869 31,191
39,825 39,456 31,414 44,934 40,823 37,465 42,038 43,207 40,526 42,158 42,158 40,577 44,183 40,365
469 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 90 mm - - Buah 62,183 56,530 49,157 57,659 50,138 58,203 50,611
63,425 64,023 67,314 71,562 66,161 60,085 68,212 68,010 65,759 68,325 68,325 63,118 65,456 64,872
470 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 110 mm - - Buah 75,509 68,644 59,691 69,727 60,632 69,708 60,615
76,699 76,678 77,785 86,540 78,831 72,102 82,488 81,612 79,521 84,569 84,569 76,644 81,820 79,288
471 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 160 mm - - Buah 162,861 148,056 128,744 147,499 128,260 146,183 127,116
162,249 160,802 164,545 183,066 164,700 152,687 174,494 176,025 165,160 169,137 169,137 162,305 176,732 165,784
472 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 200 mm - - Buah 2,271,173 2,064,703 1,795,394 2,105,213 1,830,620 2,115,599 1,839,651
2,315,734 2,327,159 2,333,546 2,579,563 2,400,115 2,202,644 2,522,233 2,493,151 2,388,702 2,478,623 2,478,623 2,342,897 2,559,336 2,367,097
473 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 250 mm - - Buah 3,224,651 2,931,501 2,549,131 2,996,912 2,606,010 3,003,528 2,611,763
3,296,603 3,303,881 3,290,898 3,692,935 3,406,615 3,128,660 3,580,302 3,541,299 3,391,895 3,536,945 3,536,945 3,327,243 3,636,090 3,360,356
474 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 315 mm - - Buah 6,514,446 5,922,224 5,149,760 6,101,095 5,305,300 6,084,208 5,290,615
6,711,205 6,692,629 6,731,381 7,510,688 6,901,914 6,337,905 7,254,196 7,201,013 6,870,959 7,166,928 7,166,928 6,738,645 7,363,818 6,808,649
475 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 63 mm - - Buah 38,494 34,995 30,430 36,205 31,482 35,869 31,191
39,825 39,456 31,414 44,934 40,823 37,465 42,038 43,207 40,526 42,158 42,158 40,577 44,183 40,365
476 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 90 mm - - Buah 62,183 56,530 49,157 57,659 50,138 58,203 50,611
63,425 64,023 67,314 71,562 66,161 60,085 68,212 68,010 65,759 68,325 68,325 63,118 65,456 64,872
477 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 110 mm - - Buah 75,509 68,644 59,691 69,727 60,632 69,708 60,615
76,699 76,678 77,785 86,540 78,831 72,102 82,488 81,612 79,521 84,569 84,569 76,644 81,820 79,288
478 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 160 mm - - Buah 162,861 148,056 128,744 147,499 128,260 146,183 127,116
162,249 160,802 164,545 183,066 164,700 152,687 174,494 176,025 165,160 169,137 169,137 162,305 176,732 165,784
479 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 63 mm - - Buah 38,494 34,995 30,430 36,205 31,482 35,869 31,191
39,825 39,456 31,414 44,934 40,823 37,465 42,038 43,207 40,526 42,158 42,158 40,577 44,183 40,365
480 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 90 mm - - Buah 62,183 56,530 49,157 57,659 50,138 58,203 50,611
63,425 64,023 67,314 71,562 66,161 60,085 68,212 68,010 65,759 68,325 68,325 63,118 65,456 64,872
481 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 110 mm - - Buah 75,509 68,644 59,691 69,727 60,632 69,708 60,615
76,699 76,678 77,785 86,540 78,831 72,102 82,488 81,612 79,521 84,569 84,569 76,644 81,820 79,288
482 MATERIAL / BAHAN BAHAN BANGUNAN Diameter 160 mm - - Buah 162,861 148,056 128,744 147,499 128,260 146,183 127,116
162,249 160,802 164,545 183,066 164,700 152,687 174,494 176,025 165,160 169,137 169,137 162,305 176,732 165,784
483 MATERIAL / BAHAN BAHAN BANGUNAN PVC REDUSER SOCKET RR JOINT Diameter 90 x 63 mm - - Buah 139,172 126,520 110,018 140,125 127,386 110,770 142,190 129
553 MATERIAL / BAHAN BAHAN BANGUNAN KUNCI TANAM Kunci Tanam Padri - - Buah 200,467 182,243 158,472 200,599 182,362 158,576 202,491 184,083 160,072 210,020 223,007 209,746 190,859 199,875 216,031 382,315 207,578 207,578 178,836 221,569 209,032
554 MATERIAL / BAHAN BAHAN BANGUNAN KUNCI TANAM Kunci Tanam Kodai - - Buah 195,972 178,156 154,918 167,344 152,131 132,288 190,038 172,762 150,228 157,066 226,941 223,336 240,340 214,152 211,812 361,461 254,404 254,404 225,423 216,600 259,487
555 MATERIAL / BAHAN BAHAN BANGUNAN KUNCI TANAM Kunci Muller - - Set 296,111 269,192 234,080 294,998 268,180 233,200 260,559 236,872 205,975 299,173 324,525 225,231 282,753 239,533 314,445 361,461 436,121 436,121 355,212 363,282 302,735
556 MATERIAL / BAHAN BAHAN BANGUNAN KUNCI TANAM Kunci SES - - Set 666,250 605,682 526,680 619,496 563,178 489,720 342,448 311,317 270,710 427,817 457,664 422,308 424,129 356,920 464,065 428,192 461,282 461,282 447,840 443,466 425,271
557 MATERIAL / BAHAN BAHAN BANGUNAN KUNCI TANAM Kunci Max - - Set 155,459 141,326 122,892 154,874 140,795 122,430 153,358 139,416 121,231 158,681 169,752 154,846 565,506 166,563 200,029 142,222 159,911 159,911 154,791 196,368 288,319
558 MATERIAL / BAHAN BAHAN BANGUNAN KUNCI TANAM Kunci Bolzano - - Set 118,444 107,677 93,632 221,249 201,135 174,900 260,559 236,872 205,975 77,785 79,884 77,423 69,275 79,316 98,341 74,934 76,880 76,880 75,305 92,829 360,399
559 MATERIAL / BAHAN BAHAN BANGUNAN KUNCI TANAM Kunci Maverik - - Set 162,861 148,056 128,744 162,249 147,499 128,260 162,291 147,537 128,293 171,127 178,073 164,700 152,687 174,494 176,025 168,218 170,087 170,087 162,305 196,368 165,784
560 MATERIAL / BAHAN BAHAN BANGUNAN KUNCI TANAM Kunci Gavani - - Set 136,211 123,828 107,677 135,699 123,363 107,272 148,891 135,355 117,700 141,569 151,446 140,769 142,084 148,320 160,823 140,692 145,374 145,374 138,259 185,657 144,159
561 MATERIAL / BAHAN BAHAN BANGUNAN KUNCI TANAM Kunci Nobelza - - Set 222,083 201,894 175,560 191,749 174,317 151,580 260,559 236,872 205,975 188,239 201,372 195,106 212,065 153,079 200,029 198,804 215,265 215,265 210,395 204,551 194,616
562 MATERIAL / BAHAN BAHAN BANGUNAN KUNCI TANAM Kunci Incole - - Set 185,070 168,245 146,300 202,208 183,825 159,848 186,114 169,194 147,125 186,683 203,037 183,000 176,721 199,875 200,029 189,628 247,135 247,135 247,966 204,551 187,407
563 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Kupu-Kupu ART 3" - - Buah 11,844 10,768 9,363 32,450 29,500 25,652 17,867 16,243 14,124 14,001 18,307 46,454 33,416 19,036 12,802 38,232 19,989 19,989 19,537 40,911 15,858
564 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Kupu-Kupu RRT 4" - - Buah 19,248 17,498 15,216 51,625 46,932 40,810 22,334 20,304 17,655 15,557 24,963 22,524 46,783 39,658 16,002 45,878 26,140 26,140 24,797 17,019 18,741
565 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Kuningan ART - - Buah 31,092 28,266 24,579 51,625 46,932 40,810 31,268 28,425 24,717 32,669 38,278 32,377 40,099 33,313 24,004 61,170 16,914 16,914 16,532 32,728 31,715
566 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Eiffel 4" - - Buah 62,183 56,530 49,157 53,100 48,272 41,976 61,046 55,496 48,257 63,784 72,011 61,046 58,671 66,625 65,610 64,229 64,580 64,580 61,616 60,548 64,872
567 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Kobra 3" - - Buah 42,937 39,033 33,942 44,250 40,227 34,980 37,223 33,839 29,425 38,892 46,407 37,223 35,345 39,658 40,805 38,996 39,978 39,978 - 47,456 37,481
568 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Dovin 4" - - Buah 39,976 36,341 31,601 54,575 49,614 43,142 68,490 62,263 54,142 57,561 71,562 56,578 53,723 30,933 64,009 72,292 61,504 61,504 57,107 44,183 57,664
569 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel MDR 3" - - Buah 17,767 16,152 14,045 44,250 40,227 34,980 16,378 14,890 12,947 18,527 20,804 16,378 28,275 23,795 17,603 17,350 18,451 18,451 18,034 24,547 17,299
570 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Ferza 4" - - Buah 39,976 36,341 31,601 44,250 40,227 34,980 41,689 37,899 32,956 37,397 40,006 40,201 42,413 43,623 43,207 50,605 46,128 46,128 - 40,911 43,248
571 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Jendela 3 "( Casament) - - Buah 22,209 20,190 17,556 29,500 26,818 23,320 29,778 27,071 23,540 26,447 24,963 30,969 35,345 31,726 28,004 28,917 27,677 27,677 27,051 40,911 28,832
572 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Majesti 4" - - Buah 14,806 13,460 11,704 29,500 26,818 23,320 14,889 13,536 11,770 15,557 21,635 15,485 28,275 15,863 20,003 28,917 17,445 17,445 15,780 18,566 15,858
573 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Valle 3" - - Buah 45,898 41,725 36,283 35,400 32,182 27,984 46,157 41,961 36,487 32,669 56,583 47,861 43,827 49,968 49,608 47,408 49,427 49,427 46,588 50,729 47,573
574 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Iron Hing 3 " - - Buah 22,209 20,190 17,556 29,500 26,818 23,320 12,357 11,234 9,769 14,001 24,963 12,852 11,876 31,726 13,602 14,458 13,272 13,272 21,313 18,566 12,975
575 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Iron Hing 4 " - - Buah 29,611 26,919 23,408 29,500 26,818 23,320 15,634 14,213 12,359 16,335 24,963 16,892 14,845 39,658 16,803 20,241 17,445 17,445 24,154 21,660 15,858
576 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Hinge 4 " - - Buah 22,209 20,190 17,556 29,500 26,818 23,320 17,867 16,243 14,124 18,668 23,299 18,300 17,672 18,242 20,003 21,688 21,527 21,527 19,837 32,728 17,299
577 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Hanter 4" - - Buah 22,209 20,190 17,556 29,500 26,818 23,320 19,356 17,597 15,301 20,224 27,233 19,707 18,379 21,415 20,804 20,965 21,806 21,806 45,085 32,728 20,182
578 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Sapphire 4" - - Buah 48,859 44,417 38,624 59,000 53,636 46,640 48,390 43,991 38,253 49,782 66,569 49,269 45,948 52,349 52,808 57,834 52,279 52,279 50,344 54,002 50,456
579 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel East 4" - - Buah 51,820 47,109 40,964 50,150 45,591 39,644 53,601 48,728 42,372 56,005 74,890 54,900 50,472 57,901 57,129 57,834 56,695 56,695 54,102 32,728 54,781
580 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel East 5 " - - Buah 60,703 55,185 47,987 59,000 53,636 46,640 67,001 60,910 52,965 63,784 74,890 63,346 57,965 66,625 65,610 72,292 65,418 65,418 61,616 54,150 64,872
581 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Kupu-kupu Piono 3" - - Buah 51,820 47,109 40,964 53,100 48,272 41,976 49,134 44,668 38,841 54,450 63,241 50,677 46,512 52,349 56,008 50,466 52,335 52,335 48,842 57,275 50,456
582 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Biasa - - Buah 31,092 28,266 24,579 91,449 83,136 72,292 7,891 7,174 6,238 32,669 38,278 32,377 35,345 31,726 33,605 29,820 32,290 32,290 31,560 34,365 31,715
583 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Glx 4" - - Buah 25,170 22,882 19,897 29,500 26,818 23,320 24,567 22,334 19,421 24,892 27,204 23,931 23,044 26,174 26,083 25,233 26,140 26,140 24,797 32,728 24,508
584 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Glx 3" - - Buah 19,248 17,498 15,216 29,500 26,818 23,320 19,356 17,597 15,301 23,335 27,233 19,707 18,379 21,415 20,804 19,881 20,352 20,352 19,537 24,547 20,182
585 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Viper 4" - - Buah 44,417 40,379 35,112 45,725 41,568 36,146 44,667 40,607 35,310 46,671 51,591 46,454 42,413 53,935 48,007 45,878 47,974 47,974 45,085 49,092 44,690
586 MATERIAL / BAHAN BAHAN BANGUNAN ENGSEL Engsel Viper 3" - - Buah 32,572 29,611 25,749 32,450 29,500 25,652 32,756 29,778 25,894 31,114 38,278 33,784 30,396 38,071 35,205 33,644 34,889 34,889 32,310 36,001 33,157
587 MATERIAL / BAHAN BAHAN BANGUNAN HAK ANGIN Hak Angin 6" - 8" Kuningan - - Buah 20,997 19,088 16,598 23,600 21,454 18,656 14,889 13,536 11,770 17,113 19,971 28,154 28,275 15,863 20,003 30,585 15,376 15,376 22,543 21,274 36,040
588 MATERIAL / BAHAN BAHAN BANGUNAN HAK ANGIN Hak Angin 6" - 8" Biasa - - Buah 8,883 8,076 7,022 17,700 16,091 13,992 63,346 57,587 50,076 14,143 12,482 7,445 14,138 7,932 16,002 21,688 9,995 9,995 7,515 16,364 17,299
589 MATERIAL / BAHAN BAHAN BANGUNAN GRENDEL Grendel Ferza 2 " - - Buah 16,287 14,806 12,875 13,945 12,678 11,024 16,892 15,356 13,353 14,959 14,978 21,115 14,845 15,863 15,129 30,585 16,914 16,914 18,034 17,183 100,912
590 MATERIAL / BAHAN BAHAN BANGUNAN GRENDEL Grendel Dolphin 2" - - Buah 16,287 14,806 12,875 10,325 9,387 8,162 14,889 13,536 11,770 16,335 18,307 29,778 14,845 15,863 16,803 38,232 17,445 17,445 12,023 17,183 25,949
591 MATERIAL / BAHAN BAHAN BANGUNAN GRENDEL Grendel 3" Biasa - - Buah 8,883 8,076 7,022 7,375 6,705 5,830 11,262 10,238 8,903 7,779 8,654 14,077 16,040 8,408 8,801 10,121 8,723 8,723 8,265 18,566 7,929
592 MATERIAL / BAHAN BAHAN BANGUNAN GRENDEL Grendel 3" ARCT - - Buah 14,065 12,786 11,119 11,800 10,727 9,328 14,889 13,536 11,770 14,779 16,643 21,115 13,572 15,070 15,202 14,458 15,376 15,376 10,520 23,207 14,416
593 MATERIAL / BAHAN BAHAN BANGUNAN GRENDEL Tarikan jendela ART - - Buah 16,797 15,270 13,279 16,225 14,750 12,826 22,334 20,304 17,655 23,335 26,628 18,612 17,672 23,795 22,694 30,585 21,527 21,527 18,034 20,455 18,741
594 MATERIAL / BAHAN BAHAN BANGUNAN GRENDEL Tarikan jendela Biasa - - Buah 8,883 8,076 7,022 9,762 8,874 7,717 20,845 18,950 16,478 11,668 16,643 14,077 13,366 19,036 12,802 15,293 14,537 14,537 8,526 13,091 11,533
595 MATERIAL / BAHAN BAHAN BANGUNAN GRENDEL Handle Pintu - - Buah 222,083 201,894 175,560 147,499 134,090 116,600 260,559 236,872 205,975 155,570 166,423 211,154 200,497 179,974 160,023 168,218 307,522 307,522 248,648 204,551 165,784
596 MATERIAL / BAHAN BAHAN BANGUNAN GRENDEL Door Stoper - - Buah 148,056 134,596 117,040 209,180 190,164 165,360 148,891 135,355 117,700 155,570 166,423 148,891 141,376 158,631 160,023 152,926 153,761 153,761 150,282 204,551 144,159
597 MATERIAL / BAHAN BAHAN BANGUNAN GRENDEL Door Closer - - Buah 518,195 471,086 409,640 516,247 469,315 408,100 521,117 473,743 411,950 544,494 582,482 521,117 494,817 555,209 560,079 535,240 538,163 538,163 525,987 572,741 504,558
598 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Closet Duduk KIA (Lux) - - Unit 2,294,862 2,086,238 1,814,120 2,949,980 2,681,800 2,332,000 2,467,116 2,242,833 1,950,289 3,111,394 3,228,614 2,998,384 2,756,840 2,599,963 3,200,450 2,752,665 3,169,149 3,169,149 2,581,845 2,945,527 2,955,268
599 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Closet Duduk TOTO (Lux) - - Buah 2,961,112 2,691,920 2,340,800 3,097,479 2,815,890 2,448,600 3,074,589 2,795,081 2,430,505 3,189,179 3,641,344 3,164,492 2,926,491 3,326,493 3,312,466 2,599,739 3,268,003 3,268,003 2,173,078 3,600,089 3,121,052
600 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Closet Jongkok KIA - - Buah 296,111 269,192 234,080 398,247 362,043 314,820 291,825 265,296 230,692 256,690 379,445 422,308 395,854 380,714 400,056 382,315 398,324 398,324 226,926 433,201 281,111
601 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Closet Jongkok TOTO - - Buah 503,389 457,626 397,936 309,748 281,589 244,860 372,226 338,388 294,250 381,146 321,197 492,692 261,547 317,262 328,047 230,919 399,778 399,778 252,474 587,915 408,888
602 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Closet Jongkok Global - - Buah 174,975 159,068 138,320 209,180 190,164 165,360 208,447 189,497 164,780 280,026 181,553 253,385 212,065 214,152 192,027 198,804 299,834 299,834 187,853 245,461 172,991
603 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Closet Jongkok Amerika Standart - - Buah 391,944 356,312 309,837 398,247 362,043 314,820 446,672 406,065 353,100 395,996 332,847 387,115 424,129 555,209 440,062 458,778 399,778 399,778 428,304 548,196 504,558
604 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Soap Holder - - Unit 79,950 72,682 63,202 81,125 73,750 64,130 98,538 89,580 77,896 54,450 99,855 81,646 100,249 79,316 86,412 107,048 84,317 84,317 81,152 88,366 80,729
605 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Floor Drain 3 inci - - Unit 74,028 67,298 58,520 61,950 56,318 48,972 62,534 56,849 49,434 63,784 71,562 63,346 66,832 72,177 65,610 63,158 65,418 65,418 57,107 68,729 93,704
606 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Bak Cuci Piring + Kran Aluminium - - Unit 1,063,847 967,133 840,986 612,121 556,474 483,890 409,449 372,227 323,675 637,836 845,431 321,603 868,822 666,250 649,691 630,055 622,732 622,732 608,643 656,199 3,906,720
607 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Bath Tube + Hand Shower - - Set 3,819,834 3,472,577 3,019,632 3,834,974 3,486,340 3,031,600 3,835,419 3,486,745 3,031,952 3,974,806 4,418,542 3,941,538 3,647,511 4,157,719 4,128,581 3,937,841 4,041,392 4,041,392 3,041,708 4,254,650 3,704,897
608 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Bak Cuci Stainless Stell 1 lobang - - Buah 909,869 827,154 719,264 383,497 348,634 303,160 384,137 349,216 303,666 299,173 282,920 381,160 357,683 674,903 423,623 458,778 436,121 436,121 380,214 327,281 389,230
609 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Bak Cuci Stainless Stell 2 lobang - - Buah 1,329,808 1,208,917 1,051,232 737,495 670,450 583,000 732,000 665,454 578,656 713,527 584,146 703,846 706,882 872,471 847,246 1,012,091 872,243 872,243 781,466 656,199 792,877
610 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Bak Fiber - - Buah 444,167 403,788 351,120 442,497 402,270 349,800 422,308 383,916 333,840 427,817 416,059 448,161 452,404 524,924 512,072 458,778 616,384 616,384 593,614 458,193 482,935
611 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Jetwaser (Setara TOTO) - - Buah 355,333 323,030 280,896 353,998 321,816 279,840 352,871 320,792 278,949 368,700 394,424 464,538 339,303 375,956 384,054 362,435 479,734 479,734 356,169 392,737 341,658
612 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Tempat Sabun (Setara TOTO) - - Buah 784,695 713,359 620,312 781,745 710,677 617,980 789,120 717,382 623,810 824,520 882,044 789,120 777,570 840,744 880,124 810,507 828,631 828,631 796,495 900,022 764,045
613 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Wastapel Lengkap (Setara TOTO) - - Buah 1,140,028 1,036,389 901,208 737,495 670,450 583,000 1,689,230 1,535,664 1,335,360 490,044 605,176 527,885 445,336 499,688 504,071 734,044 545,152 545,152 497,297 1,083,002 648,717
614 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Urinoir (Setara TOTO) - - Unit 2,887,084 2,624,622 2,282,280 2,876,231 2,614,755 2,273,700 2,903,365 2,639,423 2,295,150 3,033,609 3,245,256 3,019,499 2,756,840 3,093,305 3,120,439 2,982,054 3,110,999 3,110,999 2,930,499 3,190,988 2,811,108
615 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Kran Zink - - Buah 266,500 242,273 210,672 265,498 241,362 209,880 268,003 243,639 211,860 280,026 299,562 268,003 254,478 285,536 288,041 275,267 276,769 276,769 270,508 294,553 324,359
616 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Kran Dinding - - Buah 167,976 152,705 132,787 103,249 93,863 81,620 119,112 108,284 94,160 108,899 116,496 108,392 98,963 111,042 128,018 107,048 111,938 111,938 170,502 114,548 100,912
617 MATERIAL / BAHAN BAHAN BANGUNAN SANITAIR Roof Drain Metal - - Buah 222,083 201,894 175,560 221,249 201,135 174,900 223,336 203,033 176,550 233,355 249,635 232,269 212,065 237,947 240,034 229,389 239,867 239,867 225,423 245,461 216,239
618 MATERIAL / BAHAN BAHAN BANGUNAN Pintu fiber Kaca Grafir - - Buah 999,376 908,523 790,020 972,153 845,350 1,082,840 941,600
1,069,368 1,191,124 933,418 1,539,416 1,231,731 1,074,461 1,189,733 1,216,171 1,153,061 1,264,752 1,264,752 1,369,070 1,068,572 1,095,611
619 MATERIAL / BAHAN BAHAN BANGUNAN Pintu Fiber kaca biasa - - Buah 1,189,829 1,081,662 940,576 576,587 501,380 913,647 794,475
634,246 1,005,011 747,931 632,409 633,461 777,570 610,730 1,155,362 851,798 799,556 799,556 601,128 656,199 937,036
620 MATERIAL / BAHAN BAHAN BANGUNAN Pintu Fiber biasa - - Buah 349,950 318,136 276,640 316,940 275,600 406,065 353,100
348,634 446,672 373,966 324,525 297,781 296,890 309,331 504,071 420,547 363,435 363,435 300,564 360,009 418,062
621 MATERIAL / BAHAN BAHAN BANGUNAN Pintu Aluminium - - Buah 1,819,738 1,654,307 1,438,528 710,677 617,980 879,808 765,050
781,745 967,788 975,302 973,577 950,192 1,403,482 1,903,572 928,131 1,070,481 899,863 899,863 399,750 932,750 864,956
622 MATERIAL / BAHAN BAHAN BANGUNAN Kusen Almunium - - M 91,794 83,450 72,565 83,136 72,292 83,920 72,974
91,449 92,312 96,453 103,183 98,538 87,653 98,351 99,214 107,048 100,307 100,307 93,175 101,457 89,379
623 MATERIAL / BAHAN BAHAN BANGUNAN Rangka Jendela Almunium - - M 133,250 121,136 105,336 120,681 104,940 121,820 105,930
132,749 134,001 140,012 150,084 140,769 127,239 142,768 144,020 137,633 143,920 143,920 135,254 147,276 129,743
624 MATERIAL / BAHAN BAHAN BANGUNAN Rangka Pintu Almunium - - M 229,487 208,624 181,412 207,840 180,730 209,801 182,435
228,624 230,781 241,133 257,957 253,385 219,134 245,879 248,035 237,036 247,135 247,135 232,938 253,643 223,448
625 MATERIAL / BAHAN BAHAN BANGUNAN RAILLING Wraight Iron Type.I - - M' 2,072,778 1,884,344 1,638,560 2,087,111 1,897,374 1,649,890 2,093,400 1,903,091 1,654,862 2,177,976 2,413,139 2,159,399 1,979,270 2,270,010 2,240,315 2,150,137 2,227,126 2,227,126 2,108,457 2,290,966 2,133,559
626 MATERIAL / BAHAN BAHAN BANGUNAN RAILLING Wraight Iron Type.II - - M' 1,628,612 1,480,556 1,287,440 1,622,489 1,474,990 1,282,600 1,610,995 1,464,541 1,273,514 1,664,596 1,784,059 1,661,077 1,526,865 1,744,941 1,728,243 1,654,658 1,715,411 1,715,411 1,623,046 1,963,685 1,636,210
627 MATERIAL / BAHAN BAHAN BANGUNAN RAILLING Stainless Steel - - M' 836,515 760,468 661,276 840,744 764,313 664,620 838,254 762,049 662,651 872,464 928,642 862,915 794,535 908,956 899,326 854,856 891,142 891,142 844,585 966,966 864,956
628 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Kabel Biasa 1, 5 mm - - Rol 355,057 322,779 280,677 353,722 321,565 279,622 357,059 324,599 282,260 358,728 383,755 457,500 339,039 380,418 383,755 366,736 368,739 368,739 360,396 392,431 345,713
629 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Kabel Biasa 2, 5 mm - - Rol 563,913 512,648 445,781 561,793 510,721 444,105 567,093 515,539 448,294 569,742 609,492 668,654 538,473 604,192 609,492 582,462 585,642 585,642 572,392 623,272 549,073
630 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Saklar Forsel - - Buah 48,993 44,539 38,730 48,809 44,372 38,584 49,269 44,790 38,948 49,499 52,953 70,385 46,783 52,492 52,953 32,359 50,881 50,881 49,730 54,150 47,704
631 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Saklar Dobel - - Buah 83,988 76,353 66,394 83,672 76,066 66,144 84,462 76,783 66,768 84,856 90,776 84,462 80,199 89,987 90,776 36,135 87,224 87,224 85,251 92,829 81,778
632 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Stop Kontak - - Buah 48,993 44,539 38,730 48,809 44,372 38,584 49,269 44,790 38,948 49,499 52,953 49,269 46,783 52,492 52,953 28,917 50,881 50,881 49,730 54,150 47,704
633 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Fitting " T " - - Buah 34,995 31,814 27,664 34,863 31,694 27,560 35,192 31,993 27,820 35,357 37,824 35,192 33,416 37,495 37,824 43,375 36,343 36,343 35,521 38,679 34,074
634 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Bola Lampu Pijar 10 W - - Buah 23,796 21,633 18,811 23,707 21,552 18,741 23,931 21,755 18,917 24,042 25,720 35,192 22,723 25,496 30,259 65,063 24,713 24,713 24,154 30,943 23,170
635 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Bola Lampu Pijar 40 W - - Buah 34,995 31,814 27,664 34,863 31,694 27,560 35,192 31,993 27,820 113,142 37,824 63,346 33,416 37,495 37,824 86,751 36,343 36,343 35,521 38,679 34,074
636 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Bola Lampu TL 10 W - - Buah 48,993 44,539 38,730 48,809 44,372 38,584 49,269 44,790 38,948 49,499 52,953 49,269 46,783 52,492 52,953 72,292 50,881 50,881 49,730 54,150 47,704
637 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Bola Lampu TL 40 W - - Buah 114,871 104,428 90,807 114,439 104,035 90,465 115,518 105,017 91,319 116,058 124,155 115,518 109,688 123,076 124,155 130,126 119,297 119,297 116,598 126,962 111,848
638 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Titik Lampu + Instalasi - - Titik 139,980 127,254 110,656 139,454 126,776 110,240 140,769 127,972 111,280 141,427 151,294 140,769 133,665 149,978 151,294 115,668 145,374 145,374 142,085 154,715 136,296
639 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Stop Kontak + Instalasi - - Titik 139,980 127,254 110,656 139,454 126,776 110,240 140,769 127,972 111,280 141,427 151,294 140,769 133,665 149,978 151,294 115,668 145,374 145,374 142,085 154,715 136,296
640 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK MCB 2 - 10 A - - Buah 132,981 120,892 105,123 132,481 120,437 104,728 133,731 121,573 105,716 134,356 143,729 133,731 126,982 142,479 143,729 129,437 138,105 138,105 134,981 146,979 129,481
641 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Sekering Otomatis 6 A - - Buah 97,986 89,078 77,459 97,618 88,743 77,168 98,538 89,580 77,896 98,999 105,906 98,538 93,565 104,985 105,906 88,448 101,762 101,762 99,459 108,300 95,407
642 MATERIAL / BAHAN BAHAN BANGUNAN ALAT LISTRIK Sekering Otomatis 10 A - - Buah 125,982 114,529 99,590 125,508 114,098 99,216 126,692 115,175 100,152 127,284 136,165 126,692 120,298 134,981 136,165 112,177 130,836 130,836 127,876 139,243 122,667
643 MATERIAL / BAHAN BAHAN BANGUNAN ADIKTIF Curing Compound - - Kg 7,954 7,231 6,288 7,954 7,231 6,288 7,954 7,231 6,288 7,954 7,954 7,954 7,954 7,954 7,954 7,954 7,954 7,954 7,954 7,954 7,954
644 MATERIAL / BAHAN BAHAN BANGUNAN ADIKTIF Admixture Retarder - - Liter 28,763 26,148 22,738 28,763 26,148 22,738 28,763 26,148 22,738 28,763 28,763 28,763 28,763 28,763 28,763 28,763 28,763 28,763 28,763 28,763 28,763
645 MATERIAL / BAHAN BAHAN BANGUNAN ALAT-ALAT BANTU Amplas Niken (Niken Kensul) - - Lembar 13,998 12,725 11,066 10,325 9,387 8,162 11,262 10,238 8,903 12,445 12,802 14,077 13,366 15,897 9,078 21,688 14,537 14,537 9,017 11,455 11,533
646 MATERIAL / BAHAN BAHAN BANGUNAN ALAT-ALAT BANTU Amplas - - Lembar 13,998 12,725 11,066 10,325 9,387 8,162 11,262 10,238 8,903 12,445 12,802 14,077 13,366 15,897 9,078 21,688 14,537 14,537 9,017 11,455 11,533
647 MATERIAL / BAHAN BAHAN BANGUNAN ALAT-ALAT BANTU Benang Bouplank - - Rol 13,998 12,725 11,066 8,112 7,375 6,413 7,445 6,768 5,885 9,334 9,078 7,038 13,366 9,518 8,002 7,647 9,226 9,226 7,515 8,183 20,444
648 MATERIAL / BAHAN BAHAN BANGUNAN ALAT-ALAT BANTU Kuas 4" ETERNA - - Buah 48,993 44,539 38,730 29,500 26,818 23,320 37,223 33,839 29,425 30,337 37,824 35,192 33,223 38,071 30,405 32,115 32,290 32,290 37,571 30,274 34,074
649 MATERIAL / BAHAN BAHAN BANGUNAN ALAT-ALAT BANTU Kuas 3" ETERNA - - Buah 39,195 35,631 30,984 20,918 19,016 16,536 22,334 20,304 17,655 28,285 27,233 22,334 22,620 22,208 22,694 22,939 26,140 26,140 30,056 22,091 25,215
650 MATERIAL / BAHAN BAHAN BANGUNAN ALAT-ALAT BANTU Kuas 2,5 " ETERNA - - Buah 34,995 31,814 27,664 18,585 16,895 14,692 17,867 16,243 14,124 21,214 22,694 18,612 18,379 20,623 22,694 20,645 20,757 20,757 27,051 19,637 20,989
651 MATERIAL / BAHAN BAHAN BANGUNAN ALAT-ALAT BANTU Kuas 2" ETERNA - - Buah 20,997 19,088 16,598 14,012 12,738 11,077
KELOMPOK PEKERJAAN
LEVEL 1
(LEVEL 2)
Divisi 2 2.2.1 Pekerjaan persiapan
2.2.1.1
2.2.1.2
2.2.1.3
2.2.1.4
2.2.1.5
2.2.1.6
2.2.1.7
2.2.1.8
2.2.1.9
2.2.1.10
2.2.1.11
2.2.1.12
2.2.1.13
2.2.1.14
2.2.1.15
2.2.1.16
Divisi 2 2.3.1 Pekerjaan tanah
2.3.1.1
2.3.1.2
2.3.1.3
2.3.1.4
2.3.1.5
2.3.1.6
2.3.1.7
2.3.1.8
2.3.1.9
2.3.1.10
2.3.1.11
2.3.1.12
2.3.1.13
2.3.1.14
Divisi 3 3.2.1 Pekerjaan pondasi
3.2.1.1
3.2.1.2
3.2.1.3
3.2.1.4
3.2.1.5
3.2.1.6
3.2.1.7
3.2.1.8
3.2.1.9
3.2.1.10
3.2.1.11
Divisi 4 4.1.1 Pekerjaan beton
Divisi 4 4.1.2 Pekerjaan beton pracetak
4.2.1
Divisi 4 Pekerjaan besi & alumunium
KECAMATAN SEKAYU
1 2 3 4
A BATU
1 Koral M3 553,261
2 Batu kali M3 553,261
3 Batu pecah 5 - 7 M3 553,261
4 Batu pecah 3 - 5 M3 553,261
5 Batu pecah 2 - 3 M3 585,174
6 Batu pecah 1 - 2 ( Split ) M3 585,174
7 Batu pecah 0,5 - 1 ( Split halus ) M 3
596,870
8 Batu Krokos M3 526,652
9 Batu Sikat M3 526,652
-
B BATU ALAM -
1 Batu Palimanan (RTM) 10 x 20 cm M2 175,522
2 Batu Palimanan (RTM) 15 x 30 cm M2 187,261
3 Batu Palimanan (RTM) 20 x 40 cm M 2
204,783
4 Batu Palimanan (RTA) 10 x 20 cm M2 175,522
5 Doreng / Cacing (Bevel) 10 x 20 cm M2 175,522
6 Doreng / Cacing (Bevel) 15 x 30 cm M2 187,261
7 Andesit Polos (Susun Sirih) 3 x 20 M2 169,696
8 Andesit Polos (Susun Sirih) 3 x 30 M2 181,391
9 Andesit Polos (Susun Sirih) 3 x 40 M2 193,087
10 Andesit Polos (Susun Sirih) 3 x 50 M2 204,783
11 Andesit Polos (Susun Sirih) 3 x 60 M2 210,652
12 Andesit Polos (Susun Sirih) 6 x 30 M 2
210,652
13 Andesit Polos (Susun Sirih) 9 x 30 M2 216,522
14 Andesit Polos (Diagonal) 15 x 30 M2 210,652
15 Andesit Polos (Diagonal) 20 x 40 M2 228,217
16 Andesit Polos (Bintik Bakar) 15 x 15 M2 181,391
17 Andesit Polos (Bintik Bakar) 10 x 20 M2 181,391
18 Andesit Polos (Bintik Bakar) 10 x 30 M2 193,087
19 Andesit Polos (Bintik Bakar) 15 x 30 M2 234,043
20 Andesit Polos (Bintik Bakar) 20 x 40 M2 245,783
21 Andesit Polos (Bintik Bakar) 30 x 60 M2 310,130
22 Andesit Polos (Alur) 10 x 20 M2 181,391
23 Andesit Polos (Alur) 15 x 30 M2 210,652
24 Andesit Polos (Alur) 20 x 40 M2 222,348
25 Candi 15 x 15 M2 181,391
26 Candi 15 x 30 M2 187,261
27 Candi 20 x 40 M2 198,957
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
28 Paticitoroso 10 x 20 M2 245,783
29 Paticitoroso 15 x 30 M2 263,304
30 Paticitoroso 20 x 40 M2 263,304
31 Salagedang (S) 15 x 15 M2 204,783
32 Banjar 40 x 40 M2 204,783
33 Napoli 10 x 20 M2 181,391
34 Napoli 15 x 30 M2 210,652
35 Napoli 20 x 40 M2 210,652
36 Papan Catur 20 x 40 M2 216,522
37 Alur Miring 20 x 40 M2 216,522
38 Alur Cacing 20 x 50 M2 216,522
39 Kombinasi 20 x 50 M2 321,826
40 Polos Bakar 6 x 30 M2 204,783
41 Polos Bakar 6 x 40 M2
198,957
42 Susun Sirih Boros 3 x 30 M2 169,696
43 Susun Sirih Boros 3 x 40 M2 175,522
45 Purwakarta 5 x 20 M2 169,696
46 Purwakarta 5 x 30 M2 181,391
47 Purwakarta 10 x 20 M2 163,826
48 Purwakarta 10 x 30 M2 175,522
49 Purwakarta 15 x 30 M2 181,391
50 Templek Purwakarta M2 105,304
51 Templek Salagedang M2
105,304
52 Hijau Sukabumi M2 193,087
53 Novotel 3 x 20 M2
169,696
54 Novotel 3 x 30 M2 175,522
55 Coating (DOF-Candi-Gloss) M2 58,478
-
C BATU BATA / BATAKO / CONTBLOCK / CANSTEIN -
1 Batu Bata Lobang Buah 783
2 Batako Buah 2,435
3 Paving Block Persegi t = 6 cm Buah 2,913
4 Paving Block Persegi Warna t = 6 cm Buah 3,261
5 Paving Block Segi Delapan + kubus tebal 6 cm Buah 3,478
6 Paving Block Segi Enam tebal 6 cm Buah 3,478
7 Canstein uk. 40 x 20 x 10 CM Buah 28,087
8 Canstein uk. 40 x 30 x 10/15 CM Buah 37,435
9 Canstein uk. 60 x 20 x 10 CM Buah 35,087
10 Canstein uk. 60 x 30 x 10/15 CM Buah 50,304
11 Canstein uk. 60 x 30 x 20/12 CM Buah 53,826
12 Canstein uk. 80 x 30 x 15 CM Buah 51,478
-
D PASIR / TANAH -
1 Pasir Urug M3 132,783
2 Pasir Pasangan M3 117,000
3 Pasir Batu (Sirtu) M3 415,478
4 Tanah Pilihan M3 81,913
5 Tanah Timbunan/Urug M3 70,217
-
E KERAMIK -
1 Keramik Uk. 20 x 20 ( Std. Roman ) Buah 4,348
2 Keramik Uk. 20 x 25 ( Std. Roman ) Buah 4,435
3 Keramik Uk. 20 x 40 ( Std. Roman ) Buah 9,261
4 Keramik Uk. 20 x 60 ( Std. Roman ) Buah 23,000
5 Keramik Uk. 25 x 25 ( Std. Roman ) Buah 7,348
6 Keramik Uk. 25 x 33,3 ( Std. Roman ) Buah 8,478
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
7 Keramik Uk. 25 x 45 ( Std Roman ) Buah 12,652
8 Keramik Uk. 30 x 30 ( Std Roman ) Buah 17,783
9 Keramik Uk. 30 x 60 ( Std Roman ) Buah 34,522
10 Keramik Uk. 40 x 40 ( Std Roman ) Buah 19,870
11 Keramik Uk. 45 x 45 ( Std Roman ) Buah 24,565
12 Keramik Uk. 50 x 50 ( Std Roman ) Buah 38,000
13 Keramik Uk. 59 x 59 ( Std Roman ) Buah 65,261
14 Keramik Uk. 60 x 60 ( Std Roman ) Buah 59,261
15 Kuku Keramik M' 11,043
16 List Keramik uk. 10 x 20 cm Buah 4,391
17 List Keramik uk.10 x 30 cm Buah 14,043
18 List Granitetile 10 x 40 cm Buah 14,043
-
F GRANIT -
1 Granit Uk. 30 x 30 cm (Std Essenza) Buah 314,826
2 Granit Uk. 30 x 60 cm (Std Essenza) Buah 371,000
3 Granit Uk. 60 x 15 cm (Std Essenza) Buah 457,609
4 Granit Uk. 60 x 60 cm (Std Essenza) Buah 292,565
-
G LANTAI VINYL -
1 Lantai Vinyl Sheet M2 702,217
2 Plint Vinyl Sheet M2 234,043
3 Karpet Meteran Vinyl M2 234,043
-
H MARMER -
1 Marmer (Warna Cream) M2 1,111,870
-
I ROOSTER -
1 Rooster Tanah Liat Buah 9,348
2 Rooster Batako Buah 23,391
3 Rooster Keramik Buah 60,826
4 Rooster Kayu Buah 58,478
-
J GORONG-GORONG (BUIS BETON) -
1 Buis Beton Diameter 20 cm ( 100 cm ) Buah 102,957
2 Buis Beton Diameter 30 cm ( 100 cm ) Buah 141,609
3 Buis Beton Diameter 40 cm ( 100 cm ) Buah 234,043
4 Buis Beton Diameter 60 cm ( 100 cm ) Buah 403,783
5 Buis Beton Diameter 80 cm ( 50 cm ) Buah 585,174
6 Buis Beton Diameter 100 cm ( 50 cm ) Buah 877,783
-
K ASPAL BITUMEN -
1 Aspal Drum kg 14,261
2 Aspal Curah kg 11,696
-
L SEMEN -
1 Semen Portland Zak 69,565
2 Semen Putih Zak 60,000
-
M BESI -
1 Baja IWF / H-Beam Kg 14,174
2 Baja Sling M' 317,174
3 Besi Hollow Baja 20 x 40, tbl 2 mm Btg 105,304
4 Besi Hollow Baja 40 x 40, tbl 2 mm Btg 140,435
5 Besi Hollow Baja 60 x 40, tbl 2 mm Btg 232,348
6 Besi Siku L 25 x 25 x 3 mm - 6 Meter Batang 75,217
7 Besi Siku L 30 x 30 x 3 mm - 6 Meter Batang 82,957
8 Besi Siku L 40 x 40 x 4 mm - 6 Meter Batang 111,174
9 Besi Siku L 50 x 50 x 5 mm - 6 Meter Batang 210,217
10 Besi Beton Diameter 4 mm Kg 13,217
11 Besi Beton Diameter 6 mm Kg 13,217
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
12 Besi Beton Diameter 8 mm Kg 13,217
13 Besi Beton Diameter 10 mm Kg 13,217
14 Besi Beton Diameter 12 mm Kg 13,217
15 Besi Beton Diameter 14 mm Kg 13,217
16 Besi Beton Diameter 16 mm Kg 13,217
17 Besi Plat Rata-Rata Kg 15,391
18 Besi Tempa M2 266,000
19 Kusen Alumunium M 79,739
-
-
N KAWAT -
1 Kawat Ikat Beton Kg 22,130
2 Kawat Nyamuk Hijau M2 23,391
3 Kawat Kasa M2 27,652
4 Kawat Bronjongan 2 X 1 X 0,5 M2 121,696
5 Kawat Duri @100 m Roll 149,348
-
O PAKU -
1 Paku 1/2 Inci Kg 29,260
2 Paku 1 Inci Kg 27,664
3 Paku 1 1/2 Inci Kg 22,131
4 Paku 2 Inci Kg 19,918
5 Paku 2,5 Inci Kg 19,918
6 Paku 3 Inci Kg 19,918
7 Paku 4 Inci Kg 19,918
8 Paku 5 Inci Kg 19,918
9 Paku Seng Kg 38,730
10 Paku Asbes Kg 49,795
11 Paku Plywood Kg 46,816
12 Paku Beton Biasa Kg 46,816
13 Paku Beton 2" isi 100 batang Kotak 38,730
14 Paku Beton 3" isi 100 batang Kotak 70,224
15 Paku Beton 4" isi 100 batang Kotak 55,328
16 Paku Sewkrup 1" Kuningan Kotak 94,057
17 Paku Sewkrup 1/2" Kuningan Kotak 17,557
18 Paku Sewkrup 1/4" Kuningan Kotak 17,557
19 Paku Khusus Onduline Kotak 1,990
20 Paku beton kuning (daikin) 4'' Kotak 55,328
21 Paku beton kuning (daikin) 3'' Kotak 49,795
22 Paku beton kuning (daikin ) 2'' Kotak 38,730
23 Paku beton kuning (daikin )1,5'' Kotak 27,664
24 Paku beton kuning (daikin )1'' Kotak 22,131
25 Paku Biasa Kg 24,304
-
P PIPA BESI -
1 Pipa Besi dia. 0,50" tebal 2 mm @ 6 m Batang 93,609
2 Pipa Besi dia. 0,50" tebal 2,3 mm @ 6 m Batang 128,739
3 Pipa Besi dia. 0,75" tebal 2 mm @ 6 m Batang 117,000
4 Pipa Besi dia. 0,75" tebal 2,3 mm @ 6 m Batang 163,826
5 Pipa Besi dia. 1,00" tebal 2 mm @ 6 m Batang 128,739
6 Pipa Besi dia. 1,00" tebal 2,8 mm @ 6 m Batang 234,043
7 Pipa Besi dia. 1,50" tebal 2 mm @ 6 m Batang 188,087
8 Pipa Besi dia. 1,50" tebal 2,8 mm @ 6 m Batang 292,565
9 Pipa Besi dia. 2,00" tebal 3,2 mm @ 6 m Batang 526,652
10 Pipa Besi dia. 2,00" tebal 5 mm @ 6 m Batang 807,565
11 Pipa Ex Pertamina dia. 2.50" - 5 mm M' 136,913
12 Pipa Ex Pertamina dia. 3.50" - 5 mm M' 292,565
13 Pipa Ex Pertamina dia. 4.00" - 6 mm M' 272,696
14 Pipa Ex Pertamina dia. 5.00" - 7 mm M' 335,870
15 Pipa Ex Pertamina dia. 6.00" - 7 mm M' 433,043
16 Pipa Ex Pertamina dia. 8.00" - 8 mm M' 684,652
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
17 Pipa Galvanized Medium dia. 2 " M' 269,174
18 Pipa Galvanized Medium dia. 4 " M' 503,261
19 Pipa Galvanized Medium dia. 6 " M' 889,478
-
Q KAYU -
1 Kayu Gesek Kelas I M3 4,681,565
2 Kayu Gesek Kelas II M3 2,926,000
3 Kayu Gesek Kelas III M3 2,340,783
4 Kayu Gesek Kelas IV M3 2,106,696
5 Kayu Gelam Diameter 8 - 10 CM Panjang 4 M Batang 23,391
6 Kayu Gelam Diameter 10 - 15 CM Panjang 4 M Batang 29,217
-
R IJUK Kg 25,739
-
S PLYWOOD -
1 Plywood Tebal 3 mm (Uk. 244 cm x 122 cm) Lembar 58,478
2 Plywood Tebal 4 mm (Uk. 244 cm x 122 cm) Lembar 76,043
3 Plywood Tebal 6 mm (Uk. 244 cm x 122 cm) Lembar 91,261
4 Plywood Tebal 9 mm (Uk. 244 cm x 122 cm) Lembar 138,304
5 Plywood Tebal 12 mm (Uk. 244 cm x 122 cm) Lembar 193,087
6 Plywood Tebal 15 mm (Uk. 244 cm x 122 cm) Lembar 265,565
7 Plywood Tebal 18 mm (Uk. 244 cm x 122 cm) Lembar 310,130
-
T TEAKWOOD -
2 Teakwood Tebal 3 mm (Uk. 244 cm x 122 cm) Lembar 139,261
3 Jabarwood Tebal 3 mm (Uk. 244 cm x 122 cm) Lembar 143,826
4 Kalsiboard Tebal 4 mm (Uk. 244 cm x 122 cm) Lembar 93,609
-
U PLAFOND -
1 Gypsum Board (Uk. 9mm x 240 cm x 120 cm) Lembar 76,043
2 Textille tape Kg 23,391
3 Cornice @5 Kg Zak 88,522
4 List Gypsum Board M2 29,217
5 List Plafond Kayu 1 (Uk. 4 m) Batang 28,087
6 List Plafond Kayu 3/5 (Uk. 4 m) Batang 22,130
7 Eternit uk. 1 x 1 Meter Lembar 29,217
8 Rangka Plafond Mental Furing M2 58,478
-
V BAMBU -
1 Bambu Kecil (Uk. 6 m) Batang 23,391
2 Bambu Besar (Uk. 6 m) Batang 52,652
-
W ATAP -
1 Genteng Buleleng Buah 2,435
2 Genteng Biasa Buah 2,435
3 Genteng Kodok Buah 3,261
4 Genteng Keramik Morando Buah 4,913
5 Genteng Beton Buah 4,783
6 Genteng Keramik Natural (Setara KIA) Buah 15,957
7 Genteng Keramik Berglazur (Setara KIA) Buah 19,130
8 Genteng Metal Biasa Buah 42,130
9 Genteng Metal Zincalume Buah 43,304
10 Genteng Metal Zincalume motif pasir Buah 113,522
11 Genteng Palentong Buah 3,478
12 Genteng Palentong Super Buah 3,739
13 Cabang Tiga 'T' Genteng Keramik (Setara KIA) Buah 100,652
14 Cabang Tiga 'T' Genteng Keramik morando Buah 95,957
15 Penutup jurai atap (Helni limas) (Setara KIA) Buah 88,913
16 Penutup jurai (helni limas) Genteng Keramik morando Buah 60,826
17 Atap Alumunium Zincalume 0,25 mm (Uk. 1 m x 77 cm) Lbr 72,522
18 Atap Alumunium Zincalume 0,3 mm (Uk. 1 m x 77 cm) Lbr 85,435
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
19 Atap Alumunium Zincalume 0,4 mm (Uk. 1 m x 77 cm) Lbr 111,174
20 Atap Fiber Polycarbonat tebal 4-5 mm M2 173,217
21 Atap Onduline (Uk. 95 x 200 cm) Lbr 172,043
22 Karpet Talang L= 50 cm M' 22,130
23 Karpet Talang L = 80 cm M' 66,391
24 Listplank Metal (Uk 200 x 2440 mm) Buah 60,826
25 Listplank GRC (Uk 200 x 2440 mm) Keping 60,826
26 Talang Paralon Buah 117,000
27 Klem Talang Paralon Buah 8,826
28 Fiber Gelombang Transparan Lembar 77,435
29 Rangka Atap Baja Ringan M2 146,261
-
X BUBUNGAN -
1 Bubungan Genteng Kodok Buah 5,826
2 Bubungan Genteng Beton Biasa Buah 9,913
3 Bubungan Keramik Natural (Setara KIA) Buah 24,739
4 Bubungan Keramik KIA Berwarna Glazur (Setara KIA) Buah 31,565
5 Bubungan Keramik Morando Buah 15,174
6 Bubungan Genteng Kodok Buah 5,826
7 Bubungan Genteng Tanah Glazur Buah 6,609
8 Bubungan Genteng Metal Buah 27,652
9 Alumunium Foil Double Side M2 40,957
10 Alumunium tape (Won Tape) M2 38,609
11 Ujung Bubungan Genteng Keramik Buah 112,348
12 Nok Genteng Keramik Kanmuri Hijau Buah 31,565
13 Nok Genteng Keramik Kanmuri Natural Buah 18,696
14 Nok Onduline Buah 88,913
-
Y SENG PLAT POLOS DAN SENG GELOMBANG -
1 Seng plat polos BJLS 027 (Lebar 80 cm) M' 8,174
2 Seng plat polos BJLS 029 (Lebar 80 cm) M' 8,739
3 Seng plat polos BJLS 030 (Lebar 80 cm) M' 16,565
4 Seng plat polos BJLS 038 (Lebar 80 cm) M' 17,522
5 Seng plat polos BJLS 045 (Lebar 80 cm) M' 22,217
6 Seng plat polos BJLS 055 (Lebar 80 cm) M' 27,652
7 Seng plat polos BJLS 090 (Lebar 80 cm) M' 35,087
8 Seng plat polos BLJS 060 (Lebar 80 cm) M' 30,957
9 Seng Plat polos Aluminium 0,2 (Lebar 80 cm) M' 66,391
10 Seng gelombang BJLS 027 (Lebar 80 cm) M' 8,261
11 Seng plat polos L = 40 cm M' 25,739
12 Seng plat polos L = 45 cm M' 28,609
13 Seng plat polos L = 55 cm M' 24,304
14 Seng plat polos L = 60 cm M' 42,043
15 Seng plat polos L = 88 cm M' 38,696
-
Z PIPA PARALON TIPIS -
1 Pipa Paralon diameter. 0,50" 4 M / Batang 19,870
2 Pipa Paralon diameter 0,75" 4 M / Batang 29,217
3 Pipa Paralon diameter 1,00" 4 M / Batang 40,957
-
Aa PIPA PARALON TEBAL -
1 Pipa Paralon diameter 1,50" 4 M / Batang 70,217
2 Pipa Paralon diameter. 2,00" 4 M / Batang 91,261
3 Pipa Paralon diameter 2,50" 4 M / Batang 122,870
4 Pipa Paralon diameter 3,00" 4 M / Batang 169,696
-
Ab PIPA PVC WAVIN STANDARD TIPE AW -
1 Pipa PVC diameter 22 mm (1/2") 4 M / Batang 29,217
2 Pipa PVC diameter 26 mm (3/4") 4 M / Batang 35,304
3 Pipa PVC diameter 32 mm (1") 4 M / Batang 49,739
4 Pipa PVC diameter 60 mm (2") 4 M / Batang 106,261
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
5 Pipa PVC diameter 89 mm (3") 4 M / Batang 223,304
6 Pipa PVC diameter 114 mm (4") 4 M / Batang 331,826
7 Pipa PVC diameter 165 mm (6") 4 M / Batang 696,348
8 Pipa PVC diameter 216 mm (8") 4 M / Batang 1,170,391
9 Pipa PVC diameter 267 mm (10") 4 M / Batang 1,807,087
10 Pipa PVC diameter 318 mm (12") 4 M / Batang 2,574,870
-
Ac PIPA PVC WAVIN STANDARD TIPE D -
1 Pipa PVC diameter 60 mm (2") 4 M / Batang -
2 Pipa PVC diameter 89 mm (3") 4 M / Batang -
3 Pipa PVC diameter 114 mm (4") 4 M / Batang -
4 Pipa PVC diameter 165 mm (6") 4 M / Batang -
5 Pipa PVC diameter 216 mm (8") 4 M / Batang -
6 Pipa PVC diameter 267 mm (10") 4 M / Batang -
7 Pipa PVC diameter 318 mm (12") 4 M / Batang -
-
Ad STOP KRAN -
1 Stop Kran PVC Diameter 0,50" Buah 22,130
2 Stop Kran PVC Diameter 0,75" Buah 27,652
3 Stop Kran PVC Diameter 1,00" Buah 40,957
4 Stop Kran PVC Diameter 2,00" Buah 105,304
-
Ae KRAN AIR -
1 Kran Air GIV diameter 0,50" (RRT) Buah 29,217
2 Kran Air GIV diameter 0,75" Buah 55,304
3 Kran Air Leher Angsa Buah 292,565
4 Kran Air Wastafel ( CNN ) Buah 221,304
-
Af METER AIR -
1 Meter Air diameter 1/2" Unit 338,217
2 Meter Air diameter 3/4" Unit 853,217
3 Meter Air diameter 1" Unit 1,420,826
4 Meter Air diameter 2" Unit 4,662,870
-
Ag METER INDUK -
1 Meter Induk diameter 3" (80 mm) Unit 9,714,304
2 Meter Induk diameter 4" (100 mm) Unit 12,055,087
3 Meter Induk diameter 6" (150 mm) Unit 17,556,000
4 Meter Induk diameter 8" (200 mm) Unit 34,760,870
5 Meter Induk diameter 10" (250 mm) Unit 46,933,000
6 Meter Induk diameter 12" (300 mm) Unit 56,296,217
-
Ah CLAMB SADLE LOGAM PADUAN -
1 Clamb Sadle diameter (2" x 1/2") Buah 62,000
2 Clamb Sadle diameter (3" x 1/2") Buah 99,478
3 Clamb Sadle diameter (4" x 1/2") Buah 111,174
-
Ai SOCK -
1 Sock Drat GIV diameter (0,50") Buah 5,522
2 Sock Drat GIV diameter (0,75") Buah 6,174
3 Sock Drat GIV diameter (1,00") Buah 16,348
4 Sock PVC diameter (0,50") Buah 5,522
5 Sock PVC diameter (0,75") Buah 5,522
6 Sock PVC diameter (1,00") Buah 14,043
-
Aj ELBOW -
1 Elbow GIV diameter (0,50") Buah 5,522
2 Elbow GIV diameter (0,75") Buah 5,826
3 Elbow GIV diameter (1,00") Buah 15,478
4 Elbow PVC diameter (0,50") Buah 5,522
5 Elbow PVC diameter (0,75") Buah 5,826
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
6 Elbow PVC diameter (1,00") Buah 11,696
-
Ak PVC TEE ALL SOCKET RR JOINT (INJ.) -
1 Diameter 63 x 50 x 63 mm Buah 491,565
2 Diameter 90 x 80 x 90 mm Buah 643,696
3 Diameter 90 x 50 x 90 mm Buah 598,043
4 Diameter 110 x 100 x 110 mm Buah 739,652
5 Diameter 110 x 80 x 110 mm Buah 692,870
6 Diameter 110 x 50 x 110 mm Buah 692,870
7 Diameter 160 x 150 x 160 mm Buah 1,638,522
8 Diameter 160 x 100 x 160 mm Buah 1,463,000
9 Diameter 160 x 80 x 160 mm Buah 1,673,652
10 Diameter 200 x 200 x 200 mm Buah 1,591,739
11 Diameter 200 x 150 x 200 mm Buah 1,369,348
12 Diameter 200 x 100 x 200 mm Buah 1,226,565
13 Diameter 200 x 80 x 200 mm Buah 1,136,435
14 Diameter 250 x 250 x 250 mm Buah 2,656,783
15 Diameter 315 x 300 x 315 mm Buah 4,014,435
16 Diameter 315 x 200 x 315 mm Buah 3,078,130
17 Diameter 315 x 150 x 315 mm Buah 2,762,130
18 Diameter 315 x 100 x 315 mm Buah 2,516,348
-
Al PVC TEE RR / FLANGES JOINT (INJ.) -
1 Diameter 63 x 50 x 63 mm Buah 491,565
2 Diameter 90 x 80 x 90 mm Buah 643,696
3 Diameter 90 x 50 x 90 mm Buah 598,043
4 Diameter 110 x 100 x 110 mm Buah 739,652
5 Diameter 110 x 80 x 110 mm Buah 692,870
6 Diameter 110 x 50 x 110 mm Buah 692,870
7 Diameter 160 x 150 x 160 mm Buah 1,638,522
8 Diameter 160 x 100 x 160 mm Buah 1,463,000
9 Diameter 160 x 80 x 160 mm Buah 1,673,652
10 Diameter 200 x 200 x 200 mm Buah 1,591,739
11 Diameter 200 x 150 x 200 mm Buah 1,369,348
12 Diameter 200 x 100 x 200 mm Buah 1,226,565
13 Diameter 200 x 80 x 200 mm Buah 1,136,435
14 Diameter 250 x 250 x 250 mm Buah 2,656,783
15 Diameter 315 x 300 x 315 mm Buah 4,014,435
16 Diameter 315 x 200 x 315 mm Buah 3,078,130
17 Diameter 315 x 150 x 315 mm Buah 2,762,130
18 Diameter 315 x 100 x 315 mm Buah 2,516,348
-
Am DOP / CAP PVC SC -
1 Diameter 63 mm Buah 30,391
2 Diameter 90 mm Buah 49,130
3 Diameter 110 mm Buah 59,652
4 Diameter 160 mm Buah 128,739
-
An DOP / CAP PVC RRJ -
1 Diameter 63 mm Buah 30,391
2 Diameter 90 mm Buah 49,130
3 Diameter 110 mm Buah 59,652
4 Diameter 160 mm Buah 128,739
-
Ao PVC DOUBLE SOCKET RR JOINT -
1 Diameter 63 mm Buah 30,391
2 Diameter 90 mm Buah 49,130
3 Diameter 110 mm Buah 59,652
4 Diameter 160 mm Buah 128,739
5 Diameter 200 mm Buah 1,795,391
6 Diameter 250 mm Buah 2,549,130
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
7 Diameter 315 mm Buah 5,149,739
-
Ap PVC FLANGES SOCKET RR JOINT -
1 Diameter 63 x 50 mm Buah 307,783
2 Diameter 90 x 80 mm Buah 478,652
3 Diameter 110 x 100 mm Buah 698,696
4 Diameter 160 x 150 mm Buah 1,136,435
5 Diameter 200 x 200 mm Buah 1,795,391
6 Diameter 250 x 250 mm Buah 2,549,130
7 Diameter 315 x 300 mm Buah 5,149,739
-
Aq LONG BEND SOCKET / SPIGOT RR JOINT L 900 -
1 Diameter 63 mm Buah 30,391
2 Diameter 90 mm Buah 49,130
3 Diameter 110 mm Buah 59,652
4 Diameter 160 mm Buah 128,739
5 Diameter 200 mm Buah 1,795,391
6 Diameter 250 mm Buah 2,549,130
7 Diameter 315 mm Buah 5,149,739
-
Ar LONG BEND SOCKET / SPIGOT RR JOINT L 450 -
1 Diameter 63 mm Buah 30,391
2 Diameter 90 mm Buah 49,130
3 Diameter 110 mm Buah 59,652
4 Diameter 160 mm Buah 128,739
5 Diameter 200 mm Buah 1,795,391
6 Diameter 250 mm Buah 2,549,130
7 Diameter 315 mm Buah 5,149,739
-
As TEDMOND/Tandon Air -
1 Fiber Kapasitas 500 Buah 994,826
2 Fiber Kapasitas 1000 Buah 1,638,522
3 Fiber Kapasitas 2000 Buah 3,209,000
4 Pelampung Otomatis Buah 186,174
-
At LONG BEND ALL SOCKET RR JOINT L 900 -
1 Diameter 63 mm Buah 30,391
2 Diameter 90 mm Buah 49,130
3 Diameter 110 mm Buah 59,652
4 Diameter 160 mm Buah 128,739
5 Diameter 200 mm Buah 1,795,391
6 Diameter 250 mm Buah 2,549,130
7 Diameter 315 mm Buah 5,149,739
-
Au LONG BEND ALL SOCKET RR JOINT L 450 -
1 Diameter 63 mm Buah 30,391
2 Diameter 90 mm Buah 49,130
3 Diameter 110 mm Buah 59,652
4 Diameter 160 mm Buah 128,739
5 Diameter 200 mm Buah 1,795,391
6 Diameter 250 mm Buah 2,549,130
7 Diameter 315 mm Buah 5,149,739
-
Av LONG BEND ALL SOCKET SC JOINT L 900 -
1 Diameter 63 mm Buah 30,391
2 Diameter 90 mm Buah 49,130
3 Diameter 110 mm Buah 59,652
4 Diameter 160 mm Buah 128,739
-
Aw LONG BEND ALL SOCKET SC JOINT L 450 -
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
1 Diameter 63 mm Buah 30,391
2 Diameter 90 mm Buah 49,130
3 Diameter 110 mm Buah 59,652
4 Diameter 160 mm Buah 128,739
-
Ax PVC REDUSER SOCKET RR JOINT -
1 Diameter 90 x 63 mm Buah 110,000
2 Diameter 110 x 90 mm Buah 153,304
3 Diameter 110 x 63 mm Buah 155,652
4 Diameter 160 x 110 mm Buah 298,435
5 Diameter 200 x 160 mm Buah 476,348
6 Diameter 250 x 200 mm Buah 834,478
7 Diameter 315 x 250 mm Buah 1,341,261
-
Az PVC REDUSER SOCKET SC -
1 Diameter 63 x 50 mm Buah 307,783
2 Diameter 90 x 63 mm Buah 110,000
3 Diameter 110 x 90 mm Buah 153,304
4 Diameter 160 x 110 mm Buah 298,435
-
Ba PVC FLANGES SPIGOT -
1 Diameter 63 mm Buah 30,391
2 Diameter 90 mm Buah 49,130
3 Diameter 110 mm Buah 59,652
4 Diameter 160 mm Buah 128,739
5 Diameter 200 mm Buah 1,795,391
6 Diameter 250 mm Buah 2,549,130
7 Diameter 315 mm Buah 5,149,739
-
Bb SEAL TAPE Kotak 5,826
-
Bc LEM PVC -
1 Lem Pipa Fujika Tube 11,696
2 Lem Pipa Isarplas Tube 9,348
3 Lem Pipa Superplas Tube 16,565
-
Bd KACA POLOS -
1 Tebal 2 mm M2 83,087
2 Tebal 3 mm M2 98,913
3 Tebal 5 mm M2 122,348
4 Tebel 8 mm M2 192,565
-
Be KACA ES / RAYBEN -
1 Kaca Tebal 3 mm M2 136,913
2 Kaca Rayben 5 mm M2 142,783
3 Kaca Rayben Gelap 5 mm M2 149,783
4 Glass Block Buah 24,304
5 Kaca Grafir M2 1,026,435
6 Kaca Patri M2 2,173,391
-
Bf CAT TEMBOK -
1 Cat Tembok Interior @ 5 Kg (Setara Catylac) Galon 169,696
2 Cat Tembok Interior @ 25 Kg (Setara Catylac) Galon 904,348
3 Cat Tembok Eksterior @ 5 Kg (Setara Catylac) Galon 343,000
4 Cat Tembok Eksterior @ 25 Kg (Setara Catylac) Galon 1,825,000
5 Kapur Kg 11,043
-
Bg INTERIOR -
1 Wallpaper M2 132,217
-
Bh CAT GENTENG -
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
1 Sanlex Uk. 5 Liter Galon 234,043
2 Sanlex Special Uk. 5 Liter Galon 205,957
-
Bi CAT TAMAN -
1 Mowilex Uk. 1 Liter Galon 110,652
-
Bj CAT KAYU / BESI -
1 Ftalit ( 1 Liter) Kaleng 69,130
2 Nippon Paint ( 1 Liter) Kaleng 99,565
3 Platone ( 1 Liter) Kaleng 60,826
4 Kuda Terbang ( 1 Liter) Kaleng 64,348
5 Avian ( 1 Liter) Kaleng 69,696
6 Platon 8000 ( 1 Liter) Kaleng 62,000
7 Globe super Gloss 0,85 Liter Kaleng 49,130
8 Meni ( 1 Liter) Kaleng 66,391
9 Politur ( 1 Liter) Botol 71,913
10 Minyak Cat ( 1 Liter) Botol 33,174
11 Sirlak Kuning Kg 112,348
12 Terpentin ( 1 Liter) Botol 11,696
13 Dempul (Wood Filler) Kg 28,696
14 Thinner Cobra ( 1 Liter) Kaleng 34,043
15 Teer ( 1 Liter) Kaleng 77,435
16 Plamir (20 kg) Galon 169,565
17 Lem Kayu Kg 17,522
-
Bk KUNCI TANAM -
1 Kunci Tanam GDO Buah 158,000
2 Kunci Tanam Exito SES Buah 292,565
3 Kunci Tanam Padri Buah 158,435
4 Kunci Tanam Buah 199,174
5 Kunci Muller Set 234,043
6 Kunci SES Set 526,652
7 Kunci Max Set 122,870
8 Kunci Bolzano Set 221,304
9 Kunci Maverik Set 128,739
10 Kunci Gavani Set 107,652
11 Kunci Nobelza Set 175,522
12 Kunci Incole Set 146,261
-
Bl ENGSEL -
1 Engsel Kupu-Kupu ART 3" Buah 11,043
2 Engsel Kupu-Kupu RRT 4" Buah 16,565
3 Engsel Kuningan ART Buah 26,565
4 Engsel Eiffel 4" Buah 55,304
5 Engsel Kobra 3" Buah 44,261
6 Engsel Dovin 4" Buah 31,565
7 Engsel MDR 3" Buah 14,043
8 Engsel Ferza 4" Buah 31,565
9 Engsel Jendela 3 "( Casament) Buah 17,522
10 Engsel Majesti 4" Buah 38,696
11 Engsel Valle 3" Buah 36,261
12 Engsel Iron Hing 3 " Buah 17,522
13 Engsel Iron Hing 4 " Buah 23,391
14 Engsel Hinge 4 " Buah 27,652
15 Engsel Hanter 4" Buah 17,522
16 Engsel Sapphire 4" Buah 38,609
17 Engsel East 4" Buah 40,957
18 Engsel East 5 " Buah 49,783
19 Engsel Kupu-kupu Piono 3" Buah 40,957
20 Engsel Biasa Buah 28,696
21 Engsel Glx 4" Buah 19,870
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
22 Engsel Glx 3" Buah 15,174
23 Engsel Viper 4" Buah 35,087
24 Engsel Viper 3" Buah 25,739
-
Bm HAK ANGIN -
1 Hak Angin 6" - 8" Kuningan Buah 38,696
2 Hak Angin 6" - 8" Biasa Buah 13,043
-
Bn GRENDEL -
1 Grendel Ferza 2 " Buah 12,870
2 Grendel Dolphin 2" Buah 12,870
3 Grendel 3" Biasa Buah 12,174
4 Grendel 3" ARCT Buah 11,087
5 Tarikan jendela ART Buah 27,652
6 Tarikan jendela Biasa Buah 7,739
7 Handle Pintu Buah 186,174
8 Door Stoper Buah 165,957
9 Door Closer Buah 409,609
-
Bo SANIT AIR -
1 Closet Duduk KIA (Lux) Unit 1,814,087
2 Closet Duduk TOTO (Lux) Buah 2,340,783
3 Closet Jongkok KIA Buah 234,043
4 Closet Jongkok TOTO Buah 397,913
5 Closet Jongkok Global Buah 138,304
6 Closet Jongkok Amerika Standart Buah 331,957
7 Soap Holder Unit 63,174
8 Floor Drain Buah 283,739
9 Bak Cuci Piring + Kran Aluminium Unit 840,957
10 Bath Tube + Hand Shower Set 3,019,609
11 Bak Cuci Stainless Stell 1 lobang Buah 719,261
12 Bak Cuci Stainless Stell 2 lobang Buah 1,051,217
13 Bak air fibreglass Buah 372,391
14 Jetwaser (Setara TOTO) Buah 280,870
15 Tempat Sabun Buah 620,304
16 Wastapel Buah 904,391
17 Urinoir Unit 2,282,261
18 Kran Zink Buah 210,652
19 Kran Dinding Buah 132,783
20 Roof Drain Metal Buah 175,522
-
Bp PINTU KM / WC DAN KUSEN ALMUNIUM -
1 Pintu fiber Kaca Grafir Buah 790,000
2 Pintu Fiber kaca biasa Buah 940,565
3 Pintu Fiber biasa Buah 276,609
4 Pintu Aluminium Buah 2,102,435
5 Kusen Almunium M 79,739
6 Rangka Jendela Almunium M 106,391
7 Rangka Pintu Almunium M 181,391
-
Bq RAILLING -
1 Wraight Iron Type.I M' 1,638,522
2 Wraight Iron Type.II M' 1,287,435
3 Stainless Steel M' 661,261
-
Br ALAT LISTRIK -
1 Kabel Biasa 1, 5 mm Rol 280,652
2 Kabel Biasa 2, 5 mm Rol 445,739
3 Saklar Forsel Bh 38,696
4 Saklar Dobel Bh 66,391
5 Stop Kontak Bh 38,696
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
6 Fitting " T " Bh 27,652
7 Bola Lampu Pijar 10 W Bh 18,783
8 Bola Lampu Pijar 40 W Bh 27,652
9 Bola Lampu TL 10 W Bh 38,696
10 Bola Lampu TL 40 W Bh 90,783
11 Titik Lampu + Instalasi Ttk 120,000
12 Stop Kontak + Instalasi Ttk 110,652
13 MCB 2 - 10 A Bh 105,087
14 Sekering Otomatis 6 A Bh 77,435
15 Sekering Otomatis 10 A Bh 99,565
-
Bu ALAT-ALAT BANTU -
1 Amplas Niken (Niken Kensul) Lembar 11,043
2 Benang Bouplank Roll 11,043
3 Kuas 4" ETERNA Buah 44,261
4 Kuas 3" ETERNA Buah 33,174
5 Kuas 2,5 " ETERNA Buah 27,652
6 Kuas 2" ETERNA Buah 22,130
7 Kuas 1,5" ETERNA Buah 16,565
8 Kuas 1" ETERNA Buah 11,043
9 Kuas Roll Ace Buah 49,783
10 Kuas Roll Supra Buah 38,696
11 Ember Cor Buah 9,957
-
Bv BAHAN BAKAR, PELUMAS -
1 Premium Liter 11,043
2 Minyak Tanah Liter 14,348
3 Minyak bekisting Liter 12,478
4 Minyak Bakar Liter 9,957
5 Minyak Pelumas (Olie) Liter 38,696
6 Minyak Hydrolik Liter 38,696
7 Minyak Gemuk @16 Kg Pail 741,391
8 Minyak Rem Liter 77,435
9 Air Liter 174
-
Bz UPAH -
1 Mandor Org / Hari 144,652
2 Mekanik Org / Hari 164,391
3 Pembantu Mekanik Org / Hari 124,087
4 Kepala Tukang Org / Hari 164,391
5 Tukang Org / Hari 159,652
6 Pekerja Org / Hari 134,348
7 Operator Org / Hari 164,391
8 Pembantu Operator Org / Hari 124,087
9 Sopir (Driver) Org / Hari 154,130
10 Pembantu Sopir Org / Hari 124,087
11 Tukang Las (Welder) Org / Hari 164,391
425,019,763
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
HARGA SATUAN PEKERJAAN
No Kode
384,793
396,750
220,773
407,668
1,426,553
1,306,273
931,261
1,022,964
23,767
606,958
216,022
309,377
2,172,437
1,085,446
19,148
Err:509
120,033
146,535
173,370
159,823
241,731
192,885
8,556
52,648
85,567
85,567
231,253
273,444
203,270
616,143
1,548,061
1,490,371
1,450,400
1,422,287
1,383,782
1,479,511
1,325,270
1,297,238
1,027,600
3,642,263
1,489,056
1,199,351
1,246,406
1,302,921
1,092,721
1,346,859
1,386,420
1,419,630
1,436,863
1,466,434
1,475,476
1,598,689
1,610,558
1,626,377
15,844
19,161
21,125
189,073
180,494
338,977
254,812
268,271
455,953
466,047
563,553
472,758
428,316
135,917
5,557,340
6,760,303
10,807,938
8,422,001
7,655,599
6,622,110
7,870,565
134,326
169,850
112,534
140,730
157,519
211,060
117,244
8,517
8,517
12,325
20,090
16,207
96,758
99,566
89,312
59,740
54,390
74,006
9,912
9,912
9,912
-
-
67,381
26,989
40,392
42,601
40,991
54,175
54,175
1,820,227
65,631
1,553,554
435,944
160,741
175,029
365,322
15,700
31,044
31,271
127,946
2,387,314
765,701
68,455
154,429
112,313
273,101
450,946
952,838
277,780
123,728
326,555
311,155
301,184
295,435
2,922,066
275,114
158,528
151,469
147,281
144,638
143,000
140,223
146,213
125,775
127,063
238,165
234,389
191,044
188,086
146,583
144,965
898,405
413,905
1,988,926
367,270
367,425
106,180
98,270
94,757
92,434
91,013
89,919
89,286
88,652
93,918
90,469
84,254
85,033
131,404
103,593
123,578
121,729
120,225
118,741
51,580
96,576
2,153,259
2,153,259
76,815
44,761
21,222
90,979
58,014
104,821
58,574
239,425
330,991
226,671
-
-
-
-
-
-
-
-
-
347,610
-
-
-
92,359
78,147
-
-
-
-
-
-
-
-
-
-
-
-
95,203
475,452
-
-
-
-
-
-
-
-
-
-
1,560,273
-
-
176,812
176,812
-
-
-
-
-
360,759
390,142
1,810,202
-
-
430,393
52,495
85,849
41,932
27,955
60,999
288,924
485,089
305,811
180,571
39,788
56,974
46,530
46,530
39,224
70,941
373,553
70,137
182,661
27,107
86,277
26,407
139,693
133,538
91,388
153,239
206,989
165,339
36,419
38,243
38,243
36,969
36,969
36,969
36,969
36,969
36,969
36,969
36,969
36,969
36,969
36,969
36,969
39,051
39,051
39,051
39,051
39,051
39,051
46,113
39,051
114,152
88,210
119,392
153,307
77,604
237,511
70,936
125,855
93,071
38,897
53,971
176,997
226,272
34,631
11,369,595
11,137,642
486,449
486,449
995,759
751,522
1,124,970
772,191
852,454
891,472
917,894
966,569
9,425,530
12,043,807
11,432,757
312,709
425,769
120,805
184,903
188,058
117,722
117,402
270,571
419,584
395,496
505,709
55,688
26,742
467,722
285,329
316,624
102,524
63,376
40,928
100,534
32,544
65,824
580,526
41,854
104,716
149,127
125,564
52,326
162,263
191,908
286,834
60,742
214,644
#REF!
#REF!
#REF!
25,686
23,817
24,649
68,987
93,389
30,156
89,289
47,615
79,919
47,543
69,627
13,330
27,222
14,212
230,496
51,896
95,113
110,979
44,684
252,959
228,257
2,755,695
1,908,588
764,969
941,420
3,791,531
1,900,044
4,331,025
1,928,507
2,017,150
1,795,995
592,672
10,768,883
1,371,431
1,118,963
348,927
674,102
978,327
1,139,000
60,125
419,996
81,927
71,033
112,369
231,205
151,258
31,653
34,488
41,211
27,067
76,558
40,518
144,522
195,066
80,893
20,161
54,030
134,813
21,372
24,649
27,783
31,059
49,803
67,377
77,236
142,970
176,011
212,822
251,770
425,462
444,698
498,436
552,009 #REF! #REF!
605,581
9,027
10,517
12,007
16,268
26,786
35,012
44,698
76,251
94,502
113,709
134,589
234,659
355,792
436,317
478,049
623,155
90,537
105,174
117,828
133,111
209,362
249,633
251,925
318,643
355,609
386,359
349,056
611,807
689,720
765,478
841,392
432,144
101,694
113,673
127,438
177,632
197,616
202,266
201,701
236,810
267,324
262,593
504,058
652,288
791,199
907,627
1,052,183
103,773
120,401
134,796
147,268
231,366
275,491
294,031
491,814
463,671
505,396
459,050
809,987
768,329
1,017,367
1,119,691
1,224,813
1,222
3,614
5,751
8,042
21,189
33,688
40,579
87,106
77,987
136,233
163,666
286,444
300,084
338,046
375,842
413,638
525
1,644
2,474
4,273
11,502
17,574
23,664
46,497
59,335
72,974
87,599
158,099
239,917
295,626
325,546
425,616
5,104
15,283
24,156
34,519
89,397
124,719
132,452
194,079
223,002
247,497
227,109
411,977
465,394
518,967
572,705
626,277
14,704
23,173
33,102
76,104
98,968
106,315
195,538
236,307
272,599
272,135
540,114
700,471
835,731
983,308
1,143,511
5,926
17,584
27,668
38,215
98,968
137,831
154,768
299,311
290,842
323,944
298,664
545,381
617,483
689,924
762,180
834,621
375,842
450,604
450,604
525,870
901,712
901,712
1,051,740
373,705
375,842
469,668
450,604
676,081
788,805
788,805
27,937
56,860
85,783
114,706
172,551
201,474
230,397
288,243
346,089
403,934
461,780
519,626
577,471
635,317
385,529
432,857
551,178
669,499
787,819
906,140
1,142,782
1,261,102
1,379,423
1,616,065
1,852,706
2,089,348
1,369
1,369
1,369
1,369
1,369
1,369
1,369
1,369
1,369
1,369
-
-
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKA -
C PERALATAN -
Pipa listrik 5/8” btg 3 #N/A
T Dus buah 1 #N/A
L Bow buah 2 #N/A
-
-
#N/A
#N/A
#N/A
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 134,347.83 161,217.39
Tukang Batu L.02.03 OH 0.2000 159,652.17 31,930.43
Kepala Tukang L.03.01 OH 0.0200 164,391.30 3,287.83
Mandor L.04.01 OH 0.0600 144,652.17 8,679.13
JUMLAH TENAGA KERJA 205,114.78
B BAHAN
Semen portland kg 230.0000 1,391.30 320,000.00
Pasir Beton kg 893.0000 83.57 74,629.29
Kerikil (Maks 30 mm) kg 1,027.0000 307.37 315,666.06
Air Liter 200.0000 173.91 34,782.61
JUMLAH HARGA BAHAN 745,077.96
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 950,192.74
E Overhead & Profit 15% 0.1500 142,528.91
F Harga Satuan Pekerjaan (D+E) - 1,092,721.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (120 ±20) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 134,347.83 221,673.91
Tukang Batu L.02.03 OH 0.2750 159,652.17 43,904.35
Kepala Tukang L.03.01 OH 0.0280 164,391.30 4,602.96
Mandor L.04.01 OH 0.0830 144,652.17 12,006.13
JUMLAH TENAGA KERJA 282,187.35
B BAHAN
Semen portland kg 326.0000 1,391.30 453,565.22
Pasir Beton kg 760.0000 83.57 63,514.29
Batu Pecah 2-3 kg 1,029.0000 325.10 334,524.42
Air Liter 215.0000 173.91 37,391.30
JUMLAH HARGA BAHAN 888,995.23
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,171,182.58
E Overhead & Profit 15% 0.1500 175,677.39
F Harga Satuan Pekerjaan (D+E) - 1,346,859.00
A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 134,347.83 221,673.91
Tukang Batu L.02.03 OH 0.2750 159,652.17 43,904.35
Kepala Tukang L.03.01 OH 0.0280 164,391.30 4,602.96
Mandor L.04.01 OH 0.0830 144,652.17 12,006.13
JUMLAH TENAGA KERJA 282,187.35
B BAHAN
Semen portland kg 352.0000 1,391.30 489,739.13
Pasir Beton kg 731.0000 83.57 61,090.71
Batu Pecah 2-3 kg 1,031.0000 325.10 335,174.61
Air Liter 215.0000 173.91 37,391.30
JUMLAH HARGA BAHAN 923,395.76
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,205,583.11
E Overhead & Profit 15% 0.1500 180,837.47
F Harga Satuan Pekerjaan (D+E) - 1,386,420.00
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 134,347.83 221,673.91
Tukang Batu L.02.03 OH 0.2750 159,652.17 43,904.35
Kepala Tukang L.03.01 OH 0.0280 164,391.30 4,602.96
Mandor L.04.01 OH 0.0830 144,652.17 12,006.13
JUMLAH TENAGA KERJA 282,187.35
B BAHAN
Semen portland kg 371.0000 1,391.30 516,173.91
Pasir Beton kg 698.0000 83.57 58,332.86
Batu Pecah 2-3 kg 1,047.0000 325.10 340,376.16
Air Liter 215.0000 173.91 37,391.30
JUMLAH HARGA BAHAN 952,274.23
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,234,461.58
E Overhead & Profit 15% 0.1500 185,169.24
F Harga Satuan Pekerjaan (D+E) - 1,419,630.00
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 134,347.83 221,673.91
Tukang Batu L.02.03 OH 0.2750 159,652.17 43,904.35
Kepala Tukang L.03.01 OH 0.0280 164,391.30 4,602.96
Mandor L.04.01 OH 0.0830 144,652.17 12,006.13
JUMLAH TENAGA KERJA 282,187.35
B BAHAN
Semen portland kg 384.0000 1,391.30 534,260.87
Pasir Beton kg 692.0000 83.57 57,831.43
Batu Pecah 2-3 kg 1,039.0000 325.10 337,775.39
Air Liter 215.0000 173.91 37,391.30
JUMLAH HARGA BAHAN 967,258.99
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,249,446.34
E Overhead & Profit 15% 0.1500 187,416.95
F Harga Satuan Pekerjaan (D+E) - 1,436,863.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.1.9. Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 134,347.83 221,673.91
Tukang Batu L.02.03 OH 0.2750 159,652.17 43,904.35
Kepala Tukang L.03.01 OH 0.0280 164,391.30 4,602.96
Mandor L.04.01 OH 0.0830 144,652.17 12,006.13
JUMLAH TENAGA KERJA 282,187.35
B BAHAN
Semen portland kg 406.0000 1,391.30 564,869.57
Pasir Beton kg 684.0000 83.57 57,162.86
Batu Pecah 2-3 kg 1,026.0000 325.10 333,549.13
Air Liter 215.0000 173.91 37,391.30
JUMLAH HARGA BAHAN 992,972.86
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,275,160.20
E Overhead & Profit 15% 0.1500 191,274.03
F Harga Satuan Pekerjaan (D+E) - 1,466,434.00
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 134,347.83 221,673.91
Tukang Batu L.02.03 OH 0.2750 159,652.17 43,904.35
Kepala Tukang L.03.01 OH 0.0280 164,391.30 4,602.96
Mandor L.04.01 OH 0.0830 144,652.17 12,006.13
JUMLAH TENAGA KERJA 282,187.35
B BAHAN
Semen portland kg 413.0000 1,391.30 574,608.70
Pasir Beton kg 681.0000 83.57 56,912.14
Batu Pecah 2-3 kg 1,021.0000 325.10 331,923.65
Air Liter 215.0000 173.91 37,391.30
JUMLAH HARGA BAHAN 1,000,835.79
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,283,023.14
E Overhead & Profit 15% 0.1500 192,453.47
F Harga Satuan Pekerjaan (D+E) - 1,475,476.00
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 134,347.83 282,130.43
Tukang Batu L.02.03 OH 0.3500 159,652.17 55,878.26
Kepala Tukang L.03.01 OH 0.0350 164,391.30 5,753.70
Mandor L.04.01 OH 0.1050 144,652.17 15,188.48
JUMLAH TENAGA KERJA 358,950.87
B BAHAN
Semen portland kg 439.0000 1,391.30 610,782.61
Pasir Beton kg 670.0000 83.57 55,992.86
Batu Pecah 2-3 kg 1,006.0000 325.10 327,047.20
Air Liter 215.0000 173.91 37,391.30
JUMLAH HARGA BAHAN 1,031,213.97
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,390,164.84
E Overhead & Profit 15% 0.1500 208,524.73
F Harga Satuan Pekerjaan (D+E) - 1,598,689.00
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 134,347.83 282,130.43
Tukang Batu L.02.03 OH 0.3500 159,652.17 55,878.26
Kepala Tukang L.03.01 OH 0.0350 164,391.30 5,753.70
Mandor L.04.01 OH 0.1050 144,652.17 15,188.48
JUMLAH TENAGA KERJA 358,950.87
B BAHAN
Semen portland kg 448.0000 1,391.30 623,304.35
Pasir Beton kg 667.0000 83.57 55,742.14
Batu Pecah 2-3 kg 1,000.0000 325.10 325,096.62
Air Liter 215.0000 173.91 37,391.30
JUMLAH HARGA BAHAN 1,041,534.41
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,400,485.28
E Overhead & Profit 15% 0.1500 210,072.79
F Harga Satuan Pekerjaan (D+E) - 1,610,558.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan sesuai Tabel berikut:
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 134,347.83 282,130.43
Tukang Batu L.02.03 OH 0.3500 159,652.17 55,878.26
Kepala Tukang L.03.01 OH 0.0350 164,391.30 5,753.70
Mandor L.04.01 OH 0.1050 144,652.17 15,188.48
JUMLAH TENAGA KERJA 358,950.87
B BAHAN
Semen portland kg 448.0000 1,391.30 623,304.35
Pasir Beton kg 667.0000 83.57 55,742.14
Kerikil (Maks 30 mm) kg 1,000.0000 325.10 325,096.62
Bahan tambahan kimia Liter 4.5000 -
Air Liter 215.0000 173.91 37,391.30
JUMLAH HARGA BAHAN 1,041,534.41
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,400,485.28
E Overhead & Profit 15% 0.1500 210,072.79
F Harga Satuan Pekerjaan (D+E) - 1,610,558.00
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm - 320 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0800 134,347.83 10,747.83
Tukang Batu L.02.03 OH 0.0400 159,652.17 6,386.09
Kepala Tukang L.03.01 OH 0.0040 164,391.30 657.57
Mandor L.04.01 OH 0.0040 144,652.17 578.61
JUMLAH TENAGA KERJA 18,370.09
B BAHAN
Waterstop lebar 230 mm - 320 mm m 1.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 18,370.09
E Overhead & Profit 15% 0.1500 2,755.51
F Harga Satuan Pekerjaan (D+E) - 21,125.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5200 134,347.83 69,860.87
Tukang Kayu L.02.04 OH 0.2600 159,652.17 41,509.57
Kepala Tukang L.03.01 OH 0.0260 164,391.30 4,274.17
Mandor L.04.01 OH 0.0260 144,652.17 3,760.96
JUMLAH TENAGA KERJA 119,405.57
B BAHAN
Kayu kelas III m3 0.0400 2,340,782.61 93,631.30
Paku 5 - 10 cm kg 0.3000 24,304.35 7,291.30
Minyak bekisting Liter 0.1000 12,478.26 1,247.83
JUMLAH HARGA BAHAN 102,170.43
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 221,576.00
E Overhead & Profit 15% 0.1500 33,236.40
F Harga Satuan Pekerjaan (D+E) - 254,812.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
Pekerja L.01.01 OH 0.6600 134,347.83 88,669.57
Tukang Kayu L.02.04 OH 0.3300 159,652.17 52,685.22
Kepala Tukang L.03.01 OH 0.0330 164,391.30 5,424.91
Mandor L.04.01 OH 0.0330 144,652.17 4,773.52
JUMLAH TENAGA KERJA 151,553.22
B BAHAN
Kayu kelas III m3 0.0400 2,340,782.61 93,631.30
Paku 5 - 12 cm kg 0.4000 24,304.35 9,721.74
Minyak bekisting Liter 0.2000 12,478.26 2,495.65
Balok kayu kelas II m3 0.0180 2,926,000.00 52,668.00
Plywood 9 mm Lbr 0.3500 138,304.35 48,406.52
Dolken kayu Ø 8-10/400 cm Batang 2.0000 23,391.30 46,782.61
JUMLAH HARGA BAHAN 253,705.83
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 405,259.04
E Overhead & Profit 15% 0.1500 60,788.86
F Harga Satuan Pekerjaan (D+E) - 466,047.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6600 134,347.83 88,669.57
Tukang Kayu L.02.04 OH 0.3300 159,652.17 52,685.22
Kepala Tukang L.03.01 OH 0.0330 164,391.30 5,424.91
Mandor L.04.01 OH 0.0330 144,652.17 4,773.52
JUMLAH TENAGA KERJA 151,553.22
B BAHAN
Kayu kelas III m3 0.0400 2,340,782.61 93,631.30
Paku 5 - 12 cm kg 0.4000 24,304.35 9,721.74
Minyak bekisting Liter 0.2000 12,478.26 2,495.65
Balok kayu kelas II m3 0.0150 2,926,000.00 43,890.00
Plywood 9 mm Lbr 0.3500 138,304.35 48,406.52
Dolken kayu Ø 8-10/400 cm Batang 6.0000 23,391.30 140,347.83
JUMLAH HARGA BAHAN 338,493.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 490,046.26
E Overhead & Profit 15% 0.1500 73,506.94
F Harga Satuan Pekerjaan (D+E) - 563,553.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.1.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5.3000 134,347.83 712,043.48
Tukang batu L.02.03 OH 0.2750 159,652.17 43,904.35
Tukang kayu L.02.04 OH 1.3000 159,652.17 207,547.83
Tukang besi L.02.05 OH 1.0500 159,652.17 167,634.78
Kepala tukang L.03.01 OH 0.2620 164,391.30 43,070.52
Mandor L.04.01 OH 0.2650 144,652.17 38,332.83
JUMLAH TENAGA KERJA 1,212,533.78
B BAHAN
Kayu kelas III m3 0.2000 2,340,782.61 468,156.52
Paku Biasa kg 1.5000 24,304.35 36,456.52
Minyak bekisting Liter 0.4000 12,478.26 4,991.30
Besi beton (polos/ulir) kg 157.5000 13,217.39 2,081,739.13
Kawat beton kg 2.2500 22,130.43 49,793.48
Semen portland kg 336.0000 1,391.30 467,478.26
Pasir Beton m3 0.5400 117,000.00 63,180.00
Kerikil m3 0.8100 553,260.87 448,141.30
JUMLAH HARGA BAHAN 3,619,936.52
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 4,832,470.30
E Overhead & Profit 15% 0.1500 724,870.55
F Harga Satuan Pekerjaan (D+E) - 5,557,340.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.0500 134,347.83 947,152.17
Tukang batu L.02.03 OH 0.2750 159,652.17 43,904.35
Tukang kayu L.02.04 OH 1.6500 159,652.17 263,426.09
Tukang besi L.02.05 OH 2.1000 159,652.17 335,269.57
Kepala tukang L.03.01 OH 0.4030 164,391.30 66,249.70
Mandor L.04.01 OH 0.3530 144,652.17 51,062.22
JUMLAH TENAGA KERJA 1,707,064.09
B BAHAN
Kayu kelas III m3 0.4000 2,340,782.61 936,313.04
Paku Biasa kg 4.0000 24,304.35 97,217.39
Minyak bekisting Liter 2.0000 12,478.26 24,956.52
Besi beton (polos/ulir) kg 315.0000 13,217.39 4,163,478.26
Kawat beton kg 4.5000 22,130.43 99,586.96
Semen portland kg 336.0000 1,391.30 467,478.26
Pasir Beton m3 0.5400 117,000.00 63,180.00
Kerikil m3 0.8100 553,260.87 448,141.30
Kayu kelas II balok M3 0.1500 2,926,000.00 438,900.00
Plywood 9 mm Lbr 3.5000 138,304.35 484,065.22
Dolken kayu Ø 8-10/400 cm Batang 20.0000 23,391.30 467,826.09
JUMLAH HARGA BAHAN 7,691,143.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 9,398,207.13
E Overhead & Profit 15% 0.1500 1,409,731.07
F Harga Satuan Pekerjaan (D+E) - 10,807,938.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.1.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.3500 134,347.83 853,108.70
Tukang batu L.02.03 OH 0.2750 159,652.17 43,904.35
Tukang kayu L.02.04 OH 1.6500 159,652.17 263,426.09
Tukang besi L.02.05 OH 1.4000 159,652.17 223,513.04
Kepala tukang L.03.01 OH 0.3330 164,391.30 54,742.30
Mandor L.04.01 OH 0.3180 144,652.17 45,999.39
JUMLAH TENAGA KERJA 1,484,693.87
B BAHAN
Kayu kelas III m3 0.3200 2,340,782.61 749,050.43
Paku Biasa kg 3.2000 24,304.35 77,773.91
Minyak bekisting Liter 1.6000 12,478.26 19,965.22
Besi beton (polos/ulir) kg 210.0000 13,217.39 2,775,652.17
Kawat beton kg 3.0000 22,130.43 66,391.30
Semen portland kg 336.0000 1,391.30 467,478.26
Pasir Beton m3 0.5400 117,000.00 63,180.00
Kerikil m3 0.8100 553,260.87 448,141.30
Kayu kelas II balok m3 0.1400 2,926,000.00 409,640.00
Plywood 9 mm Lembar 2.8000 138,304.35 387,252.17
Dolken kayu Ø 8-10/400 cm Batang 16.0000 23,391.30 374,260.87
JUMLAH HARGA BAHAN 5,838,785.65
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 7,323,479.52
E Overhead & Profit 15% 0.1500 1,098,521.93
F Harga Satuan Pekerjaan (D+E) - 8,422,001.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.1.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5300 134,347.83 71,204.35
Tukang batu L.02.03 OH 0.2750 159,652.17 43,904.35
Tukang kayu L.02.04 OH 1.3000 159,652.17 207,547.83
Tukang besi L.02.05 OH 1.0500 159,652.17 167,634.78
Kepala tukang L.03.01 OH 0.2620 164,391.30 43,070.52
Mandor L.04.01 OH 0.2650 144,652.17 38,332.83
JUMLAH TENAGA KERJA 571,694.65
B BAHAN
Kayu kelas III m3 0.2400 2,340,782.61 561,787.83
Paku Biasa kg 3.2000 24,304.35 77,773.91
Minyak bekisting Liter 1.6000 12,478.26 19,965.22
Besi beton (polos/ulir) kg 157.5000 13,217.39 2,081,739.13
Kawat beton kg 2.2500 22,130.43 49,793.48
Semen portland kg 336.0000 1,391.30 467,478.26
Pasir Beton m3 0.5400 117,000.00 63,180.00
Kerikil m3 0.8100 553,260.87 448,141.30
Kayu kelas II balok m3 0.1600 2,926,000.00 468,160.00
Plywood 9 mm Lembar 2.8000 138,304.35 387,252.17
Dolken kayu Ø 8-10/400 cm Batang 24.0000 23,391.30 561,391.30
JUMLAH HARGA BAHAN 5,186,662.61
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 5,758,357.26
E Overhead & Profit 15% 0.1500 863,753.59
F Harga Satuan Pekerjaan (D+E) - 6,622,110.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
Kayu kelas II balok m3 0.1600 2,926,000.00 468,160.00
Plywood 9 mm Lembar 2.8000 138,304.35 387,252.17
Dolken kayu Ø 8-10/400 cm Batang 24.0000 23,391.30 561,391.30
JUMLAH HARGA BAHAN 5,484,053.91
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 6,055,748.57
E Overhead & Profit 15% 0.1500 908,362.28
F Harga Satuan Pekerjaan (D+E) - 6,964,110.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.1.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5.6500 134,347.83 759,065.22
Tukang batu L.02.03 OH 0.2750 159,652.17 43,904.35
Tukang kayu L.02.04 OH 1.5600 159,652.17 249,057.39
Tukang besi L.02.05 OH 1.4000 159,652.17 223,513.04
Kepala tukang L.03.01 OH 0.3230 164,391.30 53,098.39
Mandor L.04.01 OH 0.2830 144,652.17 40,936.57
JUMLAH TENAGA KERJA 1,369,574.96
B BAHAN
Kayu kelas III m3 0.2500 2,340,782.61 585,195.65
Paku Biasa kg 3.0000 24,304.35 72,913.04
Minyak bekisting Liter 1.2000 12,478.26 14,973.91
Besi beton (polos/ulir) kg 210.0000 13,217.39 2,775,652.17
Kawat beton kg 3.0000 22,130.43 66,391.30
Semen portland kg 336.0000 1,391.30 467,478.26
Pasir Beton m3 0.5400 117,000.00 63,180.00
Kerikil m3 0.8100 553,260.87 448,141.30
Kayu kelas II balok m3 0.1050 2,926,000.00 307,230.00
Plywood 9 mm Lembar 2.5000 138,304.35 345,760.87
Dolken kayu Ø 8-10/400 cm Batang 14.0000 23,391.30 327,478.26
JUMLAH HARGA BAHAN 5,474,394.78
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 6,843,969.74
E Overhead & Profit 15% 0.1500 1,026,595.46
F Harga Satuan Pekerjaan (D+E) - 7,870,565.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1320 134,347.83 17,733.91
Tukang batu L.02.03 OH 0.0220 159,652.17 3,512.35
Kepala tukang L.03.01 OH 0.0020 164,391.30 328.78
Mandor L.04.01 OH 0.0070 144,652.17 1,012.57
JUMLAH TENAGA KERJA 22,587.61
B BAHAN
Semen portland Kg 26.0800 1,391.30 36,285.22
Pasir beton Kg 60.8000 83.57 5,081.14
Kerikil (Maks 30 mm) Kg 82.3200 307.37 25,302.46
Air L 17.2000 500.00 8,600.00
JUMLAH HARGA BAHAN 75,268.82
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 97,856.43
E Overhead & Profit 15% 0.1500 14,678.46
F Harga Satuan Pekerjaan (D+E) - 112,534.00
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1650 134,347.83 22,167.39
Tukang batu L.02.03 OH 0.0280 159,652.17 4,470.26
Kepala tukang L.03.01 OH 0.0030 164,391.30 493.17
Mandor L.04.01 OH 0.0080 144,652.17 1,157.22
JUMLAH TENAGA KERJA 28,288.04
B BAHAN
Semen portland Kg 32.6000 1,391.30 45,356.52
Pasir beton Kg 76.0000 83.57 6,351.43
Kerikil (Maks 30 mm) Kg 102.9000 307.37 31,628.08
Air Ltr 21.5000 500.00 10,750.00
JUMLAH HARGA BAHAN 94,086.03
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 122,374.07
E Overhead & Profit 15% 0.1500 18,356.11
F Harga Satuan Pekerjaan (D+E) - 140,730.00
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1980 134,347.83 26,600.87
Tukang batu L.02.03 OH 0.0330 159,652.17 5,268.52
Kepala tukang L.03.01 OH 0.0030 164,391.30 493.17
Mandor L.04.01 OH 0.0100 144,652.17 1,446.52
JUMLAH TENAGA KERJA 33,809.09
B BAHAN
Semen portland Kg 32.1200 1,391.30 44,688.70
Pasir beton Kg 91.2000 83.57 7,621.71
Kerikil (Maks 30 mm) Kg 123.4800 307.37 37,953.70
Air Ltr 25.8000 500.00 12,900.00
JUMLAH HARGA BAHAN 103,164.11
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 136,973.19
E Overhead & Profit 15% 0.1500 20,545.98
F Harga Satuan Pekerjaan (D+E) - 157,519.00
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2480 134,347.83 33,318.26
Tukang batu L.02.03 OH 0.0410 159,652.17 6,545.74
Kepala tukang L.03.01 OH 0.0040 164,391.30 657.57
Mandor L.04.01 OH 0.0130 144,652.17 1,880.48
JUMLAH TENAGA KERJA 42,402.04
B BAHAN
Semen portland Kg 48.9000 1,391.30 68,034.78
Pasir beton Kg 114.0000 83.57 9,527.14
Kerikil (Maks 30 mm) Kg 154.3500 307.37 47,442.12
Air Ltr 32.2500 500.00 16,125.00
JUMLAH HARGA BAHAN 141,129.05
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 183,531.09
E Overhead & Profit 15% 0.1500 27,529.66
F Harga Satuan Pekerjaan (D+E) - 211,060.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0070 134,347.83 940.43
Tukang batu L.02.03 OH 0.0760 159,652.17 12,133.57
Kepala tukang L.03.01 OH 0.0080 164,391.30 1,315.13
Mandor L.04.01 OH 0.0010 144,652.17 144.65
JUMLAH TENAGA KERJA 14,533.78
B BAHAN
Lantai kerja tebal 10cm m3 0.0800 1,092,721.00 87,417.68
Besi hollow 50.50.3 Kg 9.3940 -
Kayu kaso 5/7 m3 0.0050 -
Phenol film 12mm Lbr 0.0800 -
Minyak bekisting L 0.2000 -
Dynabol dia 12 x 120 mm Bh 3.8820 -
JUMLAH HARGA BAHAN 87,417.68
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 101,951.46
E Overhead & Profit 15% 0.1500 15,292.72
F Harga Satuan Pekerjaan (D+E) - 117,244.00
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 134,347.83 537.39
Tukang batu L.02.03 OH 0.0380 159,652.17 6,066.78
Kepala tukang L.03.01 OH 0.0040 164,391.30 657.57
Mandor L.04.01 OH 0.0010 144,652.17 144.65
JUMLAH TENAGA KERJA 7,406.39
B BAHAN
Kayu kaso 5/7 m3 0.0050 -
Phenol film 12mm Lbr 0.0430 -
Minyak bekisting L 0.2000 -
Dynabol dia 12 x 120 mm Bh 0.6930 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 7,406.39
E Overhead & Profit 15% 0.1500 1,110.96
F Harga Satuan Pekerjaan (D+E) - 8,517.00
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 134,347.83 537.39
Tukang batu L.02.03 OH 0.0380 159,652.17 6,066.78
Kepala tukang L.03.01 OH 0.0040 164,391.30 657.57
Mandor L.04.01 OH 0.0010 144,652.17 144.65
JUMLAH TENAGA KERJA 7,406.39
B BAHAN
Kayu kaso 5/7 m3 0.0040 -
Phenol film 12mm Lbr 0.0480 -
Minyak bekisting L 0.2000 -
Paku Biasa Kg 0.0460 -
Dynabol dia 12 x 120 mm Bh 0.6930 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 7,406.39
E Overhead & Profit 15% 0.1500 1,110.96
F Harga Satuan Pekerjaan (D+E) - 8,517.00
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0530 134,347.83 7,120.43
Tukang kayu L.02.04 OH 0.0180 159,652.17 2,873.74
Mandor L.04.01 OH 0.0050 144,652.17 723.26
JUMLAH TENAGA KERJA 10,717.43
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 10,717.43
E Overhead & Profit 15% 0.1500 1,607.62
F Harga Satuan Pekerjaan (D+E) - 12,325.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0890 134,347.83 11,956.96
Tukang kayu L.02.04 OH 0.0300 159,652.17 4,789.57
Mandor L.04.01 OH 0.0050 144,652.17 723.26
JUMLAH TENAGA KERJA 17,469.78
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 17,469.78
E Overhead & Profit 15% 0.1500 2,620.47
F Harga Satuan Pekerjaan (D+E) - 20,090.00
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0710 134,347.83 9,538.70
Tukang kayu L.02.04 OH 0.0240 159,652.17 3,831.65
Mandor L.04.01 OH 0.0050 144,652.17 723.26
JUMLAH TENAGA KERJA 14,093.61
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 14,093.61
E Overhead & Profit 15% 0.1500 2,114.04
F Harga Satuan Pekerjaan (D+E) - 16,207.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.2.14. Ereksi 1 buah komponen untuk pelat pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Operator crane L.10.01 OH 0.0670 - -
Pembantu operator crane L.10.02 OH 0.0670 - -
Pekerja L.01.01 OH 0.0670 134,347.83 9,001.30
Tukang batu L.02.03 OH 0.0670 159,652.17 10,696.70
Tukang ereksi L.02.09 OH 0.1340 159,652.17 21,393.39
Kepala tukang L.03.01 OH 0.0670 164,391.30 11,014.22
Mandor L.04.01 OH 0.0670 144,652.17 9,691.70
JUMLAH TENAGA KERJA 61,797.30
B BAHAN
Solar L 6.6760 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa crane unit hari 0.0670 -
Sewa pipe support Buah hari 1.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 51,948.30
E Overhead & Profit 15% 0.1500 7,792.25
F Harga Satuan Pekerjaan (D+E) - 59,740.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0190 134,347.83 2,552.61
Tukang batu L.02.03 OH 0.0380 159,652.17 6,066.78
Operator crane L.10.01 OH 0.0190 - -
Pembantu operator crane L.10.02 OH 0.0190 - -
JUMLAH TENAGA KERJA 8,619.39
B BAHAN
Solar L 1.8970 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa crane UH 0.0190 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 8,619.39
E Overhead & Profit 15% 0.1500 1,292.91
F Harga Satuan Pekerjaan (D+E) - 9,912.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Tukang batu L.02.03 OH 0.3670 159,652.17 58,592.35
Kepala tukang L.03.01 OH 0.0740 - -
Mandor L.04.01 OH 0.0370 - -
JUMLAH TENAGA KERJA 58,592.35
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 58,592.35
E Overhead & Profit 15% 0.1500 8,788.85
F Harga Satuan Pekerjaan (D+E) - 67,381.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
181.73913
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
22130.435
12478.261
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
14100
12260.87
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.2.2.1 ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja OH 0.2000 134,347.83 26,869.57
Tukang Kayu OH 0.4000 159,652.17 63,860.87
Kepala Tukang OH 0.0200 164,391.30 3,287.83
Mandor OH 0.0200 144,652.17 2,893.04
JUMLAH TENAGA KERJA 96,911.30
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.2500 23,391.30 29,239.13
Semen portland Kg 2.5000 1,391.30 3,478.26
Seng gelombang Lbr 1.2000 8,260.87 9,913.04
Pasir beton m3 0.0050 117,000.00 585.00
Koral beton m3 0.0090 585,173.91 5,266.57
Kayu 5/7 Kls III m3 0.0720 2,340,782.61 168,536.35
Paku biasa Kg 0.0600 19,918.26 1,195.10
Meni besi Liter 0.4500 66,391.30 29,876.09
JUMLAH HARGA BAHAN 248,089.53
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 345,000.83
E Overhead & Profit 15% 0.1500 51,750.13
F Harga Satuan Pekerjaan (D+E) - 396,750.00
A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja OH 0.2000 134,347.83 26,869.57
Tukang Kayu OH 0.3000 159,652.17 47,895.65
Kepala Tukang OH 0.0200 164,391.30 3,287.83
Mandor OH 0.0200 144,652.17 2,893.04
JUMLAH TENAGA KERJA 80,946.09
B BAHAN - -
Dolken kayu Ø 8-10/400 cm Batang 1.0000 23,391.30 23,391.30
Semen portland Kg 2.0000 1,391.30 2,782.61
Kawat duri M’ 25.0000 1,493.48 37,336.96
Pasir beton m3 0.0050 117,000.00 585.00
Koral beton m3 0.0090 585,173.91 5,266.57
Paku biasa 2” - 5” Kg 0.0600 19,918.26 1,195.10
JUMLAH HARGA BAHAN 151,503.62
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 191,976.66
E Overhead & Profit 15% 0.1500 28,796.50
F Harga Satuan Pekerjaan (D+E) - 220,773.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja OH 0.1000 134,347.83 13,434.78
Tukang Kayu OH 0.1000 159,652.17 15,965.22
Kepala Tukang OH 0.0100 164,391.30 1,643.91
Mandor OH 0.0050 144,652.17 723.26
JUMLAH TENAGA KERJA 31,767.17
B BAHAN - -
Kayu balok 5/7 Kls III m3 0.1200 2,340,782.61 280,893.91
Paku 2”-3” Kg 0.0200 19,918.26 398.37
Kayu papan 3/20 Kls III m3 0.0070 2,340,782.61 16,385.48
JUMLAH HARGA BAHAN 347,777.32
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 354,494.71
E Overhead & Profit 15% 0.1500 53,174.21
F Harga Satuan Pekerjaan (D+E) - 407,668.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1.0000 134,347.83 134,347.83
Tukang Kayu L.02.04 OH 2.0000 159,652.17 319,304.35
Kepala Tukang L.03.01 OH 0.2000 164,391.30 32,878.26
Mandor L.04.01 OH 0.0500 144,652.17 7,232.61
JUMLAH TENAGA KERJA 493,763.04
B BAHAN - -
Dolken kayu Ø 8-10/400 cm Batang 1.7000 23,391.30 39,765.22
Kayu Kls III m3 0.2100 2,340,782.61 491,564.35
Paku biasa Kg 0.3000 19,918.26 5,975.48
Semen portland Kg 10.5000 1,391.30 14,608.70
Pasir beton m3 0.0300 117,000.00 3,510.00
Koral beton m3 0.0500 585,173.91 29,258.70
Seng gelombang Lbr 1.5000 - -
Seng plat Lbr 0.2500 - -
JUMLAH HARGA BAHAN 47,377.39
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 809,792.96
E Overhead & Profit 15% 0.1500 121,468.94
F Harga Satuan Pekerjaan (D+E) - 931,261.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Tukang Kayu L.02.04 OH 0.3000 159,652.17 47,895.65
Kepala Tukang L.03.01 OH 0.0300 164,391.30 4,931.74
JUMLAH TENAGA KERJA 52,827.39
B BAHAN - -
Kayu papan kelas III m3 0.0360 2,340,782.61 84,268.17
Kayu balok 5/7 kelas III m3 0.0210 2,340,782.61 49,156.43
Paku biasa kg 0.0800 19,918.26 1,593.46
JUMLAH HARGA BAHAN 135,018.07
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 187,845.46
E Overhead & Profit 15% 0.1500 28,176.82
F Harga Satuan Pekerjaan (D+E) - 216,022.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
50.46875
80000
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1.2000 134,347.83 161,217.39
Mandor L.04.01 OH 0.0450 144,652.17 6,509.35
JUMLAH TENAGA KERJA 167,726.74
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 167,726.74
E Overhead & Profit 15% 0.1500 25,159.01
F Harga Satuan Pekerjaan (D+E) - 192,885.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Mandor L.04.01 OH 0.0100 144,652.17 1,446.52
JUMLAH TENAGA KERJA 41,750.87
B BAHAN - -
Pasir urug M3 1.2000 132,782.61 159,339.13
JUMLAH HARGA BAHAN 159,339.13
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 201,090.00
E Overhead & Profit 15% 0.1500 30,163.50
F Harga Satuan Pekerjaan (D+E) - 231,253.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0700 134,347.83 9,404.35
Tukang cat L.02.08 OH 0.0090 159,652.17 1,436.87
Kepala tukang L.03.01 OH 0.0060 164,391.30 986.35
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 12,261.52
B BAHAN
Cat menie Kg 0.2000 66,391.30 13,278.26
Plamuur Kg 0.1500 8,478.26 1,271.74
Cat dasar Kayu Kg 0.1700 69,130.43 11,752.17
Cat Penutup Kayu Kg 0.2600 69,130.43 17,973.91
Kuas Bh 0.0100 22,130.43 221.30
Thineer Kg 0.0300 34,043.48 1,021.30
Ampelas Lbr 0.2000 11,043.48 2,208.70
JUMLAH HARGA BAHAN 47,727.39
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 59,988.91
E Overhead & Profit 15% 0.1500 8,998.34
F Harga Satuan Pekerjaan (D+E) - 68,987.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0700 134,347.83 9,404.35
Tukang cat L.02.08 OH 0.1050 159,652.17 16,763.48
Kepala tukang L.03.01 OH 0.0040 164,391.30 657.57
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 27,259.35
B BAHAN
Cat menie Kg 0.2000 66,391.30 13,278.26
Plamuur Kg 0.1500 8,478.26 1,271.74
Cat dasar Kayu Kg 0.1700 69,130.43 11,752.17
Cat Penutup Kayu Kg 0.3500 69,130.43 24,195.65
Kuas Bh 0.0100 22,130.43 221.30
Thiner Kg 0.0300 34,043.48 1,021.30
Ampelas Lbr 0.2000 11,043.48 2,208.70
JUMLAH HARGA BAHAN 53,949.13
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 81,208.48
E Overhead & Profit 15% 0.1500 12,181.27
F Harga Satuan Pekerjaan (D+E) - 93,389.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1600 134,347.83 21,495.65
Tukang cat L.02.08 OH 0.1600 159,652.17 25,544.35
Kepala tukang L.03.01 OH 0.0160 164,391.30 2,630.26
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 50,104.22
B BAHAN
Vernis L 0.1500 112,347.83 16,852.17
Dempul Kg 0.0500 28,695.65 1,434.78
Ampelas Lbr 0.1000 11,043.48 1,104.35
JUMLAH HARGA BAHAN 19,391.30
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 69,495.52
E Overhead & Profit 15% 0.1500 10,424.33
F Harga Satuan Pekerjaan (D+E) - 79,919.00
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0200 134,347.83 2,686.96
Tukang cat L.02.08 OH 0.0630 159,652.17 10,058.09
Kepala tukang L.03.01 OH 0.0063 164,391.30 1,035.67
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 14,214.67
B BAHAN
Plamuur Kg 0.1000 8,478.26 847.83
Cat dasar Tembok Kg 0.1000 73,000.00 7,300.00
Cat Penutup Tembok Kg 0.2600 73,000.00 18,980.00
JUMLAH HARGA BAHAN 27,127.83
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 41,342.49
E Overhead & Profit 15% 0.1500 6,201.37
F Harga Satuan Pekerjaan (D+E) - 47,543.00
A.4.7.1.11.a Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) EXTERIOR
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0280 134,347.83 3,761.74
Tukang cat L.02.08 OH 0.0420 159,652.17 6,705.39
Kepala tukang L.03.01 OH 0.0042 164,391.30 690.44
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 11,591.53
B BAHAN
Cat dasar Tembok Kg 0.1200 73,000.00 8,760.00
Cat Tembok Eksterior (Setara Catylac) Kg 0.1800 223,300.00 40,194.00
JUMLAH HARGA BAHAN 48,954.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 60,545.53
E Overhead & Profit 15% 0.1500 9,081.83
F Harga Satuan Pekerjaan (D+E) - 69,627.00
A.4.7.1.11.b Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) INTERIOR
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0280 - -
Tukang cat L.02.08 OH 0.0420 134,347.83 5,642.61
Kepala tukang L.03.01 OH 0.0042 159,652.17 670.54
Mandor L.04.01 OH 0.0030 164,391.30 493.17
JUMLAH TENAGA KERJA 6,806.32
B BAHAN
Cat dasar Tembok Kg 0.1200 223,300.00 26,796.00
Cat Tembok Interior (Setara Catylac) Kg 0.1800 243,100.00 43,758.00
JUMLAH HARGA BAHAN 70,554.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 77,360.32
E Overhead & Profit 15% 0.1500 11,604.05
F Harga Satuan Pekerjaan (D+E) - 88,964.00
Pelaburan
A.4.7.1.12.
1 m2 tembok dengan kalkarium
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0280 134,347.83 3,761.74
Tukang cat L.02.08 OH 0.0420 159,652.17 6,705.39
Kepala tukang L.03.01 OH 0.0042 164,391.30 690.44
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 11,591.53
B BAHAN
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
Kalkarium Kg 0.1000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 11,591.53
E Overhead & Profit 15% 0.1500 1,738.73
F Harga Satuan Pekerjaan (D+E) - 13,330.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur Tembok
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 134,347.83 20,152.17
Tukang cat L.02.08 OH 0.0010 159,652.17 159.65
Kepala tukang L.03.01 OH 0.0001 164,391.30 16.44
Mandor L.04.01 OH 0.0025 144,652.17 361.63
JUMLAH TENAGA KERJA 20,689.90
B BAHAN
Kapur Tembok Kg 0.1500 11,043.48 1,656.52
Ampelas Lbr 0.1000 11,043.48 1,104.35
Kuas Bh 0.0100 22,130.43 221.30
JUMLAH HARGA BAHAN 2,982.17
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 23,672.07
E Overhead & Profit 15% 0.1500 3,550.81
F Harga Satuan Pekerjaan (D+E) - 27,222.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 134,347.83 33,586.96
Tukang cat L.02.08 OH 0.2250 159,652.17 35,921.74
Kepala tukang L.03.01 OH 0.0225 164,391.30 3,698.80
Mandor L.04.01 OH 0.0075 144,652.17 1,084.89
JUMLAH TENAGA KERJA 74,292.39
B BAHAN
Menie besi Kg 0.1000 66,391.30 6,639.13
Thiner L 0.0100 34,043.48 340.43
Kuas Bh 0.0100 22,130.43 221.30
Perancah kayu m3 0.0020 606,958.00 1,213.92
JUMLAH HARGA BAHAN 8,414.79
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 82,707.18
E Overhead & Profit 15% 0.1500 12,406.08
F Harga Satuan Pekerjaan (D+E) - 95,113.00
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0600 134,347.83 8,060.87
Tukang cat L.02.08 OH 0.0600 159,652.17 9,579.13
Kepala tukang L.03.01 OH 0.0120 164,391.30 1,972.70
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 20,046.65
B BAHAN
Cat Besi Kg 0.3000 60,826.09 18,247.83
Kuas Bh 0.0100 22,130.43 221.30
Thiner L 0.0100 34,043.48 340.43
JUMLAH HARGA BAHAN 18,809.57
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 38,856.22
E Overhead & Profit 15% 0.1500 5,828.43
F Harga Satuan Pekerjaan (D+E) - 44,684.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.4000 134,347.83 53,739.13
Tukang cat L.02.08 OH 0.7000 159,652.17 111,756.52
Kepala tukang L.03.01 OH 0.0700 164,391.30 11,507.39
Mandor L.04.01 OH 0.0200 144,652.17 2,893.04
JUMLAH TENAGA KERJA 179,896.09
B BAHAN
Cat Besi Kg 0.3000 60,826.09 18,247.83
Thiner L 0.0100 34,043.48 340.43
JUMLAH HARGA BAHAN 18,588.26
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 198,484.35
E Overhead & Profit 15% 0.1500 29,772.65
F Harga Satuan Pekerjaan (D+E) - 228,257.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
0.9000
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.5000 134,347.83 201,521.74
Tukang Batu L.02.03 OH 0.7500 159,652.17 119,739.13
Kepala Tukang L.03.01 OH 0.0750 164,391.30 12,329.35
Mandor L.04.01 OH 0.0750 144,652.17 10,848.91
JUMLAH TENAGA KERJA 344,439.13
B BAHAN - -
Batu Kali m3 1.2000 553,260.87 663,913.04
Semen portland Kg 91.0000 1,391.30 126,608.70
Pasir Pasang m3 0.5840 117,000.00 68,328.00
JUMLAH HARGA BAHAN 858,849.74
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,203,288.87
E Overhead & Profit 15% 0.1500 180,493.33
F Harga Satuan Pekerjaan (D+E) - 1,383,782.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7800 134,347.83 104,791.30
Tukang Batu L.02.03 OH 0.3900 159,652.17 62,264.35
Kepala Tukang L.03.01 OH 0.0390 164,391.30 6,411.26
Mandor L.04.01 OH 0.0390 144,652.17 5,641.43
JUMLAH TENAGA KERJA 179,108.35
B BAHAN
Batu Kali m3 1.2000 553,260.87 663,913.04
Pasir urug m3 0.4320 117,000.00 50,544.00
JUMLAH HARGA BAHAN 714,457.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 893,565.39
E Overhead & Profit 15% 0.1500 134,034.81
F Harga Satuan Pekerjaan (D+E) - 1,027,600.00
A.3.2.1.10. (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4000 134,347.83 456,782.61
Tukang Batu L.02.03 OH 0.8500 159,652.17 135,704.35
Kepala Tukang L.03.01 OH 0.0850 164,391.30 13,973.26
Mandor L.04.01 OH 0.1700 144,652.17 24,590.87
JUMLAH TENAGA KERJA 631,051.09
B BAHAN
Batu Kali m3 0.4800 553,260.87 265,565.22
Semen portland Kg 194.0000 1,391.30 269,913.04
Pasir Beton m3 0.3120 117,000.00 36,504.00
Kerikil m3 0.4680 553,260.87 258,926.09
Besi beton (polos/ulir) Kg 126.0000 13,217.39 1,665,391.30
Kawat beton Kg 1.8000 22,130.43 39,834.78
JUMLAH HARGA BAHAN 2,536,134.43
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 3,167,185.52
E Overhead & Profit 15% 0.1500 475,077.83
F Harga Satuan Pekerjaan (D+E) - 3,642,263.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.1 ANALISA HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.1. Pemasangan 1m2 dinding bata merah (8x8x16) cm tebal 1 batu campuran 1 SP : 2 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 134,347.83 80,608.70
Tukang Batu L.02.03 OH 0.2000 159,652.17 31,930.43
Kepala Tukang L.03.01 OH 0.0200 164,391.30 3,287.83
Mandor L.04.01 OH 0.0300 144,652.17 4,339.57
JUMLAH TENAGA KERJA 120,166.52
B BAHAN
Bata merah buah 120.0000 782.61 93,913.04
Semen portland Kg 43.5000 1,391.30 60,521.74
Pasir Pasang m3 0.0800 117,000.00 9,360.00
JUMLAH HARGA BAHAN 163,794.78
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 283,961.30
E Overhead & Profit 15% 0.1500 42,594.20
F Harga Satuan Pekerjaan (D+E) - 326,555.00
A.4.4.1.2. Pemasangan 1m2 dinding bata merah (8x8x16) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 134,347.83 80,608.70
Tukang Batu L.02.03 OH 0.2000 159,652.17 31,930.43
Kepala Tukang L.03.01 OH 0.0200 164,391.30 3,287.83
Mandor L.04.01 OH 0.0300 144,652.17 4,339.57
JUMLAH TENAGA KERJA 120,166.52
B BAHAN
Bata merah buah 120.0000 782.61 93,913.04
Semen portland Kg 32.9500 1,391.30 45,843.48
Pasir Pasang m3 0.0910 117,000.00 10,647.00
JUMLAH HARGA BAHAN 150,403.52
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 270,570.04
E Overhead & Profit 15% 0.1500 40,585.51
F Harga Satuan Pekerjaan (D+E) - 311,155.00
A.4.4.1.3. Pemasangan 1m2 dinding bata merah (8x8x16) cm tebal 1 batu campuran 1 SP : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 134,347.83 80,608.70
Tukang Batu L.02.03 OH 0.2000 159,652.17 31,930.43
Kepala Tukang L.03.01 OH 0.0200 164,391.30 3,287.83
Mandor L.04.01 OH 0.0300 144,652.17 4,339.57
JUMLAH TENAGA KERJA 120,166.52
B BAHAN
Bata merah buah 120.0000 782.61 93,913.04
Semen portland Kg 26.5500 1,391.30 36,939.13
Pasir Pasang m3 0.0930 117,000.00 10,881.00
JUMLAH HARGA BAHAN 141,733.17
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 261,899.70
E Overhead & Profit 15% 0.1500 39,284.95
F Harga Satuan Pekerjaan (D+E) - 301,184.00
A.4.4.1.4. Pemasangan 1m2 dinding bata merah (8x8x16) cm tebal 1 batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 134,347.83 80,608.70
Tukang Batu L.02.03 OH 0.2000 159,652.17 31,930.43
Kepala Tukang L.03.01 OH 0.0200 164,391.30 3,287.83
Mandor L.04.01 OH 0.0300 144,652.17 4,339.57
JUMLAH TENAGA KERJA 120,166.52
B BAHAN
Bata merah buah 120.0000 782.61 93,913.04
Semen portland Kg 22.2000 1,391.30 30,886.96
Pasir Pasang m3 0.1020 117,000.00 11,934.00
JUMLAH HARGA BAHAN 136,734.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 256,900.52
E Overhead & Profit 15% 0.1500 38,535.08
F Harga Satuan Pekerjaan (D+E) - 295,435.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (8x8x16) cm tebal 1 batu campuran 1 SP : 6 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.0000 134,347.83 806,086.96
Tukang Batu L.02.03 OH 2.0000 159,652.17 319,304.35
Kepala Tukang L.03.01 OH 0.2000 164,391.30 32,878.26
Mandor L.04.01 OH 0.3000 144,652.17 43,395.65
JUMLAH TENAGA KERJA 1,201,665.22
B BAHAN
Bata merah buah 1,200.0000 782.61 939,130.43
Semen portland Kg 185.0000 1,391.30 257,391.30
Pasir Pasang m3 1.2200 117,000.00 142,740.00
JUMLAH HARGA BAHAN 1,339,261.74
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,540,926.96
E Overhead & Profit 15% 0.1500 381,139.04
F Harga Satuan Pekerjaan (D+E) - 2,922,066.00
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (8x8x16) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 134,347.83 80,608.70
Tukang Batu L.02.03 OH 0.2000 159,652.17 31,930.43
Kepala Tukang L.03.01 OH 0.0200 164,391.30 3,287.83
Mandor L.04.01 OH 0.0300 144,652.17 4,339.57
JUMLAH TENAGA KERJA 120,166.52
B BAHAN
Bata merah buah 120.0000 782.61 93,913.04
Semen portland Kg 10.0800 1,391.30 14,024.35
Kapur m3 0.0275 11,043.48 303.70
Pasir Pasang m3 0.0925 117,000.00 10,822.50
JUMLAH HARGA BAHAN 119,063.59
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 239,230.11
E Overhead & Profit 15% 0.1500 35,884.52
F Harga Satuan Pekerjaan (D+E) - 275,114.00
A.4.4.1.7 Pemasangan 1m2 dinding bata merah (8x8x16) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
Bata merah buah 60.0000 782.61 46,956.52
Semen portland Kg 18.9500 1,391.30 26,365.22
Pasir Pasang m3 0.0380 117,000.00 4,446.00
JUMLAH HARGA BAHAN 77,767.74
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 137,851.00
E Overhead & Profit 15% 0.1500 20,677.65
F Harga Satuan Pekerjaan (D+E) - 158,528.00
A.4.4.1.8 Pemasangan 1m2 dinding bata merah (8x8x16) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
Bata merah buah 60.0000 782.61 46,956.52
Semen portland Kg 14.3700 1,391.30 19,993.04
Pasir Pasang m3 0.0400 117,000.00 4,680.00
JUMLAH HARGA BAHAN 71,629.57
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 131,712.83
E Overhead & Profit 15% 0.1500 19,756.92
F Harga Satuan Pekerjaan (D+E) - 151,469.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (8x8x16) cm tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
Bata merah buah 60.0000 782.61 46,956.52
Semen portland Kg 11.5000 1,391.30 16,000.00
Pasir Pasang m3 0.0430 117,000.00 5,031.00
JUMLAH HARGA BAHAN 67,987.52
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 128,070.78
E Overhead & Profit 15% 0.1500 19,210.62
F Harga Satuan Pekerjaan (D+E) - 147,281.00
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (8x8x16)cm tebal ½ batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
Bata merah buah 60.0000 782.61 46,956.52
Semen portland Kg 9.6800 1,391.30 13,467.83
Pasir Pasang m3 0.0450 117,000.00 5,265.00
JUMLAH HARGA BAHAN 65,689.35
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 125,772.61
E Overhead & Profit 15% 0.1500 18,865.89
F Harga Satuan Pekerjaan (D+E) - 144,638.00
A.4.4.1.11 Pemasangan 1m2 dinding bata merah (8x8x16)cm tebal ½ batu campuran 1 SP : 6 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
Bata merah buah 60.0000 782.61 46,956.52
Semen portland Kg 8.3200 1,391.30 11,575.65
Pasir Pasang m3 0.0490 117,000.00 5,733.00
JUMLAH HARGA BAHAN 64,265.17
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 124,348.43
E Overhead & Profit 15% 0.1500 18,652.27
F Harga Satuan Pekerjaan (D+E) - 143,000.00
A.4.4.1.12 Pemasangan 1m2 dinding bata merah (8x8x16)cm tebal ½ batu campuran 1SP : 8 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
Bata merah buah 60.0000 782.61 46,956.52
Semen portland Kg 6.5000 1,391.30 9,043.48
Pasir Pasang m3 0.0500 117,000.00 5,850.00
JUMLAH HARGA BAHAN 61,850.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 121,933.26
E Overhead & Profit 15% 0.1500 18,289.99
F Harga Satuan Pekerjaan (D+E) - 140,223.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.1.13 Pemasangan 1m2 dinding bata merah (8x8x16)cm tebal ½ batu campuran 1SP : 3KP :10PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
Bata merah buah 70.0000 782.61 54,782.61
Semen portland Kg 4.5000 1,391.30 6,260.87
Kapur m3 0.0150 11,043.48 165.65
Pasir Pasang m3 0.0500 117,000.00 5,850.00
JUMLAH HARGA BAHAN 67,059.13
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 127,142.39
E Overhead & Profit 15% 0.1500 19,071.36
F Harga Satuan Pekerjaan (D+E) - 146,213.00
A.4.4.1.14 Pemasangan 1m2 dinding bata merah (8x8x16)cm tebal ½ batu campuran 1SM : 1KP :1PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
Bata merah buah 60.0000 782.61 46,956.52
Semen Merah Kg 0.0180 1,391.30 25.04
Kapur m3 0.0180 11,043.48 198.78
Pasir Pasang m3 0.0180 117,000.00 2,106.00
JUMLAH HARGA BAHAN 49,286.35
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 109,369.61
E Overhead & Profit 15% 0.1500 16,405.44
F Harga Satuan Pekerjaan (D+E) - 125,775.00
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (8x8x16) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
Bata merah buah 60.0000 782.61 46,956.52
Semen Merah Kg 0.0140 1,391.30 19.48
Kapur m3 0.0140 11,043.48 154.61
Pasir Pasang m3 0.0280 117,000.00 3,276.00
JUMLAH HARGA BAHAN 50,406.61
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 110,489.87
E Overhead & Profit 15% 0.1500 16,573.48
F Harga Satuan Pekerjaan (D+E) - 127,063.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.1.17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP:4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 134,347.83 47,021.74
Tukang Batu L.02.03 OH 0.1500 159,652.17 23,947.83
Kepala Tukang L.03.01 OH 0.0150 164,391.30 2,465.87
Mandor L.04.01 OH 0.0180 144,652.17 2,603.74
JUMLAH TENAGA KERJA 76,039.17
B BAHAN
HB-20 m3 12.5000 -
Semen portland Kg 24.2600 1,391.30 33,753.04
Pasir Pasang m3 0.7720 117,000.00 90,324.00
Besi angker dia 8 Kg 0.2800 13,217.39 3,700.87
JUMLAH HARGA BAHAN 127,777.91
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 203,817.09
E Overhead & Profit 15% 0.1500 30,572.56
F Harga Satuan Pekerjaan (D+E) - 234,389.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.1.21 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
HB-10 m3 12.5000 -
Semen portland Kg 12.1300 1,391.30 16,876.52
Pasir Pasang m3 0.3880 117,000.00 45,396.00
Besi angker dia 8 Kg 0.2800 13,217.39 3,700.87
JUMLAH HARGA BAHAN 65,973.39
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 126,056.65
E Overhead & Profit 15% 0.1500 18,908.50
F Harga Satuan Pekerjaan (D+E) - 144,965.00
A.4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
Bata rooster m3 30.0000 23,391.30 701,739.13
Semen portland Kg 11.0000 1,391.30 15,304.35
Pasir Pasang m3 0.0350 117,000.00 4,095.00
JUMLAH HARGA BAHAN 721,138.48
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 781,221.74
E Overhead & Profit 15% 0.1500 117,183.26
F Harga Satuan Pekerjaan (D+E) - 898,405.00
A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1000 159,652.17 15,965.22
Kepala Tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 60,083.26
B BAHAN
Bata berongga m3 30.0000 9,347.83 280,434.78
Semen portland Kg 11.0000 1,391.30 15,304.35
Pasir Pasang m3 0.0350 117,000.00 4,095.00
JUMLAH HARGA BAHAN 299,834.13
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 359,917.39
E Overhead & Profit 15% 0.1500 53,987.61
F Harga Satuan Pekerjaan (D+E) - 413,905.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6700 134,347.83 90,013.04
Tukang Batu L.02.03 OH 1.3000 159,652.17 207,547.83
Kepala Tukang L.03.01 OH 0.1300 164,391.30 21,370.87
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 319,365.70
B BAHAN
Bata ringan tebal 7,5 cm m3 8.4000 -
Mortar siap pakai Kg 0.4730 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 319,365.70
E Overhead & Profit 15% 0.1500 47,904.85
F Harga Satuan Pekerjaan (D+E) - 367,270.00
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6710 134,347.83 90,147.39
Tukang Batu L.02.03 OH 1.3000 159,652.17 207,547.83
Kepala Tukang L.03.01 OH 0.1300 164,391.30 21,370.87
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 319,500.04
B BAHAN
Bata ringan tebal 7,5 cm m3 8.4000 -
Mortar siap pakai Kg 0.0630 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 319,500.04
E Overhead & Profit 15% 0.1500 47,925.01
F Harga Satuan Pekerjaan (D+E) - 367,425.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
29220660
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1500 159,652.17 23,947.83
Kepala Tukang L.03.01 OH 0.0150 164,391.30 2,465.87
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 68,887.83
B BAHAN
Semen portland Kg 5.1840 1,391.30 7,212.52
Pasir Pasang m3 0.0260 117,000.00 3,042.00
JUMLAH HARGA BAHAN 10,254.52
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 79,142.35
E Overhead & Profit 15% 0.1500 11,871.35
F Harga Satuan Pekerjaan (D+E) - 91,013.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3600 134,347.83 48,365.22
Tukang Batu L.02.03 OH 0.1200 159,652.17 19,158.26
Kepala Tukang L.03.01 OH 0.0120 164,391.30 1,972.70
Mandor L.04.01 OH 0.0180 144,652.17 2,603.74
JUMLAH TENAGA KERJA 72,099.91
B BAHAN
Semen portland Kg 5.7600 1,391.30 8,013.91
Kapur Pasang m3 0.0030 11,043.48 33.13
Pasir Pasang m3 0.0130 117,000.00 1,521.00
JUMLAH HARGA BAHAN 9,568.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 81,667.96
E Overhead & Profit 15% 0.1500 12,250.19
F Harga Satuan Pekerjaan (D+E) - 93,918.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.4000 134,347.83 53,739.13
Tukang Batu L.02.03 OH 0.2000 159,652.17 31,930.43
Kepala Tukang L.03.01 OH 0.0200 164,391.30 3,287.83
Mandor L.04.01 OH 0.0220 144,652.17 3,182.35
JUMLAH TENAGA KERJA 92,139.74
B BAHAN
Semen portland Kg 13.6320 1,391.30 18,966.26
Pasir Pasang m3 0.0270 117,000.00 3,159.00
JUMLAH HARGA BAHAN 22,125.26
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 114,265.00
E Overhead & Profit 15% 0.1500 17,139.75
F Harga Satuan Pekerjaan (D+E) - 131,404.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.4000 134,347.83 53,739.13
Tukang Batu L.02.03 OH 0.2000 159,652.17 31,930.43
Kepala Tukang L.03.01 OH 0.0200 164,391.30 3,287.83
Mandor L.04.01 OH 0.0220 144,652.17 3,182.35
JUMLAH TENAGA KERJA 92,139.74
B BAHAN
Semen portland Kg 5.8880 1,391.30 8,192.00
Pasir Pasang m3 0.0360 117,000.00 4,212.00
JUMLAH HARGA BAHAN 12,404.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 104,543.74
E Overhead & Profit 15% 0.1500 15,681.56
F Harga Satuan Pekerjaan (D+E) - 120,225.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.4500 134,347.83 60,456.52
Tukang Batu L.02.03 OH 0.2250 159,652.17 35,921.74
Kepala Tukang L.03.01 OH 0.0230 164,391.30 3,781.00
Mandor L.04.01 OH 0.0230 144,652.17 3,327.00
JUMLAH TENAGA KERJA 103,486.26
B BAHAN
Semen portland Kg 10.0000 1,391.30 13,913.04
Batu granit Kg 15.0000 117,000.00 1,755,000.00
JUMLAH HARGA BAHAN 1,768,913.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,872,399.30
E Overhead & Profit 15% 0.1500 280,859.90
F Harga Satuan Pekerjaan (D+E) - 2,153,259.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0700 134,347.83 9,404.35
Tukang Batu L.02.03 OH 0.0350 159,652.17 5,587.83
Kepala Tukang L.03.01 OH 0.0040 164,391.30 657.57
Mandor L.04.01 OH 0.0040 144,652.17 578.61
JUMLAH TENAGA KERJA 16,228.35
B BAHAN
Semen portland Kg 1.6000 1,391.30 2,226.09
JUMLAH HARGA BAHAN 2,226.09
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 18,454.43
E Overhead & Profit 15% 0.1500 2,768.17
F Harga Satuan Pekerjaan (D+E) - 21,222.00
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 134,347.83 40,304.35
Tukang Batu L.02.03 OH 0.1500 159,652.17 23,947.83
Kepala Tukang L.03.01 OH 0.0150 164,391.30 2,465.87
Mandor L.04.01 OH 0.0150 144,652.17 2,169.78
JUMLAH TENAGA KERJA 68,887.83
B BAHAN
Semen portland Kg 6.3400 1,391.30 8,820.87
Pasir Pasang m3 0.0120 117,000.00 1,404.00
JUMLAH HARGA BAHAN 10,224.87
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 79,112.70
E Overhead & Profit 15% 0.1500 11,866.90
F Harga Satuan Pekerjaan (D+E) - 90,979.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.0000 134,347.83 940,434.78
Tukang kayu L.02.04 OH 21.0000 159,652.17 3,352,695.65
Kepala tukang L.03.01 OH 2.1000 164,391.30 345,221.74
Mandor L.04.01 OH 0.3500 144,652.17 50,628.26
JUMLAH TENAGA KERJA 4,688,980.43
B BAHAN
Balok kayu m3 1.1000 4,681,565.22 5,149,721.74
Paku Biasa Kg 1.2500 24,304.35 30,380.43
Lem Kayu/Karet Kg 1.0000 17,521.74 17,521.74
JUMLAH HARGA BAHAN 5,197,623.91
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 9,886,604.35
E Overhead & Profit 15% 0.1500 1,482,990.65
F Harga Satuan Pekerjaan (D+E) - 11,369,595.00
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.0000 134,347.83 806,086.96
Tukang kayu L.02.04 OH 18.0000 159,652.17 2,873,739.13
Kepala tukang L.03.01 OH 1.8000 164,391.30 295,904.35
Mandor L.04.01 OH 0.3000 144,652.17 43,395.65
JUMLAH TENAGA KERJA 4,019,126.09
B BAHAN
Balok kayu m3 1.2000 4,681,565.22 5,617,878.26
Paku Biasa Kg 1.2500 24,304.35 30,380.43
Lem Kayu/Karet Kg 1.0000 17,521.74 17,521.74
JUMLAH HARGA BAHAN 5,665,780.43
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 9,684,906.52
E Overhead & Profit 15% 0.1500 1,452,735.98
F Harga Satuan Pekerjaan (D+E) - 11,137,642.00
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 134,347.83 47,021.74
Tukang kayu L.02.04 OH 1.0500 159,652.17 167,634.78
Kepala tukang L.03.01 OH 0.1050 164,391.30 17,261.09
Mandor L.04.01 OH 0.0180 144,652.17 2,603.74
JUMLAH TENAGA KERJA 234,521.35
B BAHAN
kayu Papan m3 0.0400 4,681,565.22 187,262.61
Paku Biasa Kg 0.0500 24,304.35 1,215.22
JUMLAH HARGA BAHAN 188,477.83
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 422,999.17
E Overhead & Profit 15% 0.1500 63,449.88
F Harga Satuan Pekerjaan (D+E) - 486,449.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 134,347.83 134,347.83
Tukang kayu L.02.04 OH 3.0000 159,652.17 478,956.52
Kepala tukang L.03.01 OH 0.3000 164,391.30 49,317.39
Mandor L.04.01 OH 0.0500 144,652.17 7,232.61
JUMLAH TENAGA KERJA 669,854.35
B BAHAN
kayu Papan m3 0.0400 4,681,565.22 187,262.61
Lem Kayu/Karet Kg 0.5000 17,521.74 8,760.87
JUMLAH HARGA BAHAN 196,023.48
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 865,877.83
E Overhead & Profit 15% 0.1500 129,881.67
F Harga Satuan Pekerjaan (D+E) - 995,759.00
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 134,347.83 107,478.26
Tukang kayu L.02.04 OH 2.4000 159,652.17 383,165.22
Kepala tukang L.03.01 OH 0.2400 164,391.30 39,453.91
Mandor L.04.01 OH 0.0400 144,652.17 5,786.09
JUMLAH TENAGA KERJA 535,883.48
B BAHAN
kayu Papan m3 0.0240 4,681,565.22 112,357.57
Lem Kayu/Karet Kg 0.3000 17,521.74 5,256.52
JUMLAH HARGA BAHAN 117,614.09
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 653,497.57
E Overhead & Profit 15% 0.1500 98,024.63
F Harga Satuan Pekerjaan (D+E) - 751,522.00
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 134,347.83 134,347.83
Tukang kayu L.02.04 OH 3.0000 159,652.17 478,956.52
Kepala tukang L.03.01 OH 0.3000 164,391.30 49,317.39
Mandor L.04.01 OH 0.0500 144,652.17 7,232.61
JUMLAH TENAGA KERJA 669,854.35
B BAHAN
kayu Papan m3 0.0640 4,681,565.22 299,620.17
Lem Kayu/Karet Kg 0.5000 17,521.74 8,760.87
JUMLAH HARGA BAHAN 308,381.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 978,235.39
E Overhead & Profit 15% 0.1500 146,735.31
F Harga Satuan Pekerjaan (D+E) - 1,124,970.00
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 134,347.83 94,043.48
Tukang kayu L.02.04 OH 2.1000 159,652.17 335,269.57
Kepala tukang L.03.01 OH 0.2100 164,391.30 34,522.17
Mandor L.04.01 OH 0.0350 144,652.17 5,062.83
JUMLAH TENAGA KERJA 468,898.04
B BAHAN
kayu Papan m3 0.0250 4,681,565.22 117,039.13
Paku Biasa kg 0.0300 24,304.35 729.13
Lem Kayu/Karet kg 0.5000 17,521.74 8,760.87
Plywood 4 mm Lembar 1.0000 76,043.48 76,043.48
JUMLAH HARGA BAHAN 202,572.61
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 671,470.65
E Overhead & Profit 15% 0.1500 100,720.60
F Harga Satuan Pekerjaan (D+E) - 772,191.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 134,347.83 107,478.26
Tukang kayu L.02.04 OH 2.4000 159,652.17 383,165.22
Kepala tukang L.03.01 OH 0.2400 164,391.30 39,453.91
Mandor L.04.01 OH 0.0400 144,652.17 5,786.09
JUMLAH TENAGA KERJA 535,883.48
B BAHAN
kayu Papan m3 0.0256 4,681,565.22 119,848.07
Paku Biasa kg 0.0300 24,304.35 729.13
Lem Kayu/Karet kg 0.5000 17,521.74 8,760.87
Plywood 4 mm Lembar 1.0000 76,043.48 76,043.48
JUMLAH HARGA BAHAN 205,381.55
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 741,265.03
E Overhead & Profit 15% 0.1500 111,189.75
F Harga Satuan Pekerjaan (D+E) - 852,454.00
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8500 134,347.83 114,195.65
Tukang kayu L.02.04 OH 2.5500 159,652.17 407,113.04
Kepala tukang L.03.01 OH 0.2550 164,391.30 41,919.78
Mandor L.04.01 OH 0.0430 144,652.17 6,220.04
JUMLAH TENAGA KERJA 569,448.52
B BAHAN
Kayu Papan m3 0.0250 4,681,565.22 117,039.13
Paku Biasa kg 0.0300 24,304.35 729.13
Lem Kayu/Karet kg 0.8000 17,521.74 14,017.39
Teakwood 4 mm 90 x 220 cm Lembar 1.0000 139,260.87 139,260.87
Formika Lembar 0.5000 -
JUMLAH HARGA BAHAN 271,046.52
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 840,495.04
E Overhead & Profit 15% 0.1500 126,074.26
F Harga Satuan Pekerjaan (D+E) - 966,569.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.0000 134,347.83 537,391.30
Tukang kayu L.02.04 OH 12.0000 159,652.17 1,915,826.09
Kepala tukang L.03.01 OH 1.2000 164,391.30 197,269.57
Mandor L.04.01 OH 0.2000 144,652.17 28,930.43
JUMLAH TENAGA KERJA 2,679,417.39
B BAHAN
Balok kayu m3 1.1000 4,681,565.22 5,149,721.74
Besi strip kg 15.0000 15,391.30 230,869.57
Paku Biasa kg 5.6000 24,304.35 136,104.35
JUMLAH HARGA BAHAN 5,516,695.65
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 8,196,113.04
E Overhead & Profit 15% 0.1500 1,229,416.96
F Harga Satuan Pekerjaan (D+E) - 9,425,530.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 134,347.83 13,434.78
Tukang kayu L.02.04 OH 0.1000 159,652.17 15,965.22
Kepala tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0050 144,652.17 723.26
JUMLAH TENAGA KERJA 31,767.17
B BAHAN
Kayu 5/7 m3 0.0140 4,681,565.22 65,541.91
Reng (3 x 4) cm m3 0.0570 4,681,565.22 266,849.22
Paku Biasa kg 0.2500 24,304.35 6,076.09
JUMLAH HARGA BAHAN 338,467.22
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 370,234.39
E Overhead & Profit 15% 0.1500 55,535.16
F Harga Satuan Pekerjaan (D+E) - 425,769.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 134,347.83 13,434.78
Tukang kayu L.02.04 OH 0.2000 159,652.17 31,930.43
Kepala tukang L.03.01 OH 0.0200 164,391.30 3,287.83
Mandor L.04.01 OH 0.0050 144,652.17 723.26
JUMLAH TENAGA KERJA 49,376.30
B BAHAN
Kayu Papan m3 0.0108 4,681,565.22 50,560.90
Paku Biasa kg 0.1000 24,304.35 2,430.43
JUMLAH HARGA BAHAN 52,991.34
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 102,367.64
E Overhead & Profit 15% 0.1500 15,355.15
F Harga Satuan Pekerjaan (D+E) - 117,722.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 134,347.83 26,869.57
Tukang kayu L.02.04 OH 0.6000 159,652.17 95,791.30
Kepala tukang L.03.01 OH 0.0600 164,391.30 9,863.48
Mandor L.04.01 OH 0.0100 144,652.17 1,446.52
JUMLAH TENAGA KERJA 133,970.87
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 4,681,565.22 131,083.83
Paku Biasa kg 0.1500 24,304.35 3,645.65
Plywood 4 mm Lembar 0.8600 76,043.48 65,397.39
Lem Kayu/Karet kg 0.5600 17,521.74 9,812.17
JUMLAH HARGA BAHAN 209,939.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 343,909.91
E Overhead & Profit 15% 0.1500 51,586.49
F Harga Satuan Pekerjaan (D+E) - 395,496.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.2.5. Pemasangan 1 m’ bubung genteng keramik morando
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.4000 134,347.83 53,739.13
Tukang Kayu L.02.04 OH 0.2000 159,652.17 31,930.43
Kepala tukang L.03.01 OH 0.0200 164,391.30 3,287.83
Mandor L.04.01 OH 0.0020 144,652.17 289.30
JUMLAH TENAGA KERJA 89,246.70
B BAHAN
Genteng bubung Bh 5.0000 15,173.91 75,869.57
Semen portland Kg 8.0000 1,391.30 11,130.43
Pasir Pasang M3 0.0320 117,000.00 3,744.00
JUMLAH HARGA BAHAN 90,744.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 179,990.70
E Overhead & Profit 15% 0.1500 26,998.60
F Harga Satuan Pekerjaan (D+E) - 206,989.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1400 134,347.83 18,808.70
Tukang Kayu L.02.04 OH 0.0750 159,652.17 11,973.91
Kepala tukang L.03.01 OH 0.0080 164,391.30 1,315.13
Mandor L.04.01 OH 0.0080 144,652.17 1,157.22
JUMLAH TENAGA KERJA 33,254.96
B BAHAN
Asbes gelombang 92x250 Lbr 0.6000 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 33,254.96
E Overhead & Profit 15% 0.1500 4,988.24
F Harga Satuan Pekerjaan (D+E) - 38,243.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1400 134,347.83 18,808.70
Tukang Kayu L.02.04 OH 0.0700 159,652.17 11,175.65
Kepala tukang L.03.01 OH 0.0070 164,391.30 1,150.74
Mandor L.04.01 OH 0.0070 144,652.17 1,012.57
JUMLAH TENAGA KERJA 32,147.65
B BAHAN
Asbes gelombang 92x250 Lbr 0.4200 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 32,147.65
E Overhead & Profit 15% 0.1500 4,822.15
F Harga Satuan Pekerjaan (D+E) - 36,969.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1400 134,347.83 18,808.70
Tukang Kayu L.02.04 OH 0.0700 159,652.17 11,175.65
Kepala tukang L.03.01 OH 0.0070 164,391.30 1,150.74
Mandor L.04.01 OH 0.0070 144,652.17 1,012.57
JUMLAH TENAGA KERJA 32,147.65
B BAHAN
Asbes gelombang 92x250 Lbr 0.3700 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 32,147.65
E Overhead & Profit 15% 0.1500 4,822.15
F Harga Satuan Pekerjaan (D+E) - 36,969.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1400 134,347.83 18,808.70
Tukang Kayu L.02.04 OH 0.0700 159,652.17 11,175.65
Kepala tukang L.03.01 OH 0.0070 164,391.30 1,150.74
Mandor L.04.01 OH 0.0070 144,652.17 1,012.57
JUMLAH TENAGA KERJA 32,147.65
B BAHAN
Asbes gelombang 92x250 Lbr 0.5700 -
Paku pancing 6x23 Kg 0.1200 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 32,147.65
E Overhead & Profit 15% 0.1500 4,822.15
F Harga Satuan Pekerjaan (D+E) - 36,969.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0840 134,347.83 11,285.22
Tukang Kayu L.02.04 OH 0.1250 159,652.17 19,956.52
Kepala tukang L.03.01 OH 0.0130 164,391.30 2,137.09
Mandor L.04.01 OH 0.0040 144,652.17 578.61
JUMLAH TENAGA KERJA 33,957.43
B BAHAN
Nok paten 92cm Lbr 1.2000 -
Paku skrup Bh 6.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 33,957.43
E Overhead & Profit 15% 0.1500 5,093.62
F Harga Satuan Pekerjaan (D+E) - 39,051.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0840 134,347.83 11,285.22
Tukang Kayu L.02.04 OH 0.1250 159,652.17 19,956.52
Kepala tukang L.03.01 OH 0.0130 164,391.30 2,137.09
Mandor L.04.01 OH 0.0040 144,652.17 578.61
JUMLAH TENAGA KERJA 33,957.43
B BAHAN
Nok paten 92cm Lbr 1.1000 -
Paku skrup Bh 6.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 33,957.43
E Overhead & Profit 15% 0.1500 5,093.62
F Harga Satuan Pekerjaan (D+E) - 39,051.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap Jurai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 134,347.83 26,869.57
Tukang Kayu L.02.04 OH 0.1000 159,652.17 15,965.22
Kepala tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0010 144,652.17 144.65
JUMLAH TENAGA KERJA 44,623.35
B BAHAN
Genteng metal Bh 2.0000 42,130.43 84,260.87
Paku biasa ½”-1” Kg 0.2000 22,131.30 4,426.26
JUMLAH HARGA BAHAN 88,687.13
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 133,310.48
E Overhead & Profit 15% 0.1500 19,996.57
F Harga Satuan Pekerjaan (D+E) - 153,307.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.2.37. Pemasangan 1 m’ nok genteng metal
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 134,347.83 33,586.96
Tukang Kayu L.02.04 OH 0.1500 159,652.17 23,947.83
Kepala tukang L.03.01 OH 0.0150 164,391.30 2,465.87
Mandor L.04.01 OH 0.0130 144,652.17 1,880.48
JUMLAH TENAGA KERJA 61,881.13
B BAHAN
Nok genteng metal Bh 1.1000 42,130.43 46,343.48
Paku Biasa Kg 0.0500 24,304.35 1,215.22
JUMLAH HARGA BAHAN 47,558.70
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 109,439.83
E Overhead & Profit 15% 0.1500 16,415.97
F Harga Satuan Pekerjaan (D+E) - 125,855.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.2.41. Pemasangan 1 m2 atap alumunium
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 134,347.83 20,152.17
Tukang Kayu L.02.04 OH 0.7500 159,652.17 119,739.13
Kepala tukang L.03.01 OH 0.0800 164,391.30 13,151.30
Mandor L.04.01 OH 0.0060 144,652.17 867.91
JUMLAH TENAGA KERJA 153,910.52
B BAHAN
Alumunium gel tbl 0,55 Lbr 1.0500 -
Paku hak panj 15cm Kg 0.0200 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 153,910.52
E Overhead & Profit 15% 0.1500 23,086.58
F Harga Satuan Pekerjaan (D+E) - 176,997.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 134,347.83 13,434.78
Tukang kayu L.02.04 OH 0.1000 159,652.17 15,965.22
Kepala tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0050 144,652.17 723.26
JUMLAH TENAGA KERJA 31,767.17
B BAHAN
Tripleks 4 mm Lembar 0.3750 76,043.48 28,516.30
Paku tripleks kg 0.0300 46,815.65 1,404.47
JUMLAH HARGA BAHAN 29,920.77
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 61,687.95
E Overhead & Profit 15% 0.1500 9,253.19
F Harga Satuan Pekerjaan (D+E) - 70,941.00
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5000 134,347.83 67,173.91
Tukang kayu L.02.04 OH 0.5000 159,652.17 79,826.09
Kepala tukang L.03.01 OH 0.0500 164,391.30 8,219.57
Mandor L.04.01 OH 0.0250 144,652.17 3,616.30
JUMLAH TENAGA KERJA 158,835.87
B BAHAN
Profil Allum"T" m 3.6000 -
Kawat dia 4 mm kg 0.1500 -
Ramset Buah 1.0500 -
Akustik 60 x 120 Lembar 1.5000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 158,835.87
E Overhead & Profit 15% 0.1500 23,825.38
F Harga Satuan Pekerjaan (D+E) - 182,661.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0500 134,347.83 6,717.39
Tukang Kayu L.02.04 OH 0.0500 159,652.17 7,982.61
Kepala tukang L.03.01 OH 0.0050 164,391.30 821.96
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 15,955.91
B BAHAN
List kayu profil m 1.0500 7,021.74 7,372.83
Paku Biasa kg 0.0100 24,304.35 243.04
JUMLAH HARGA BAHAN 7,615.87
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 23,571.78
E Overhead & Profit 15% 0.1500 3,535.77
F Harga Satuan Pekerjaan (D+E) - 27,107.00
A.4.5.1.10 Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40
Lihat pada kelompok Pekerjaan Besi dan Alumunium ( A.9.21)
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.5.1.1 5. (K3) Pemasangan 1 buah wastafel
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 134,347.83 161,217.39
Tukang batu L.02.03 OH 1.4500 159,652.17 231,495.65
Kepala tukang L.03.01 OH 0.1500 164,391.30 24,658.70
Mandor L.04.01 OH 0.0600 144,652.17 8,679.13
JUMLAH TENAGA KERJA 426,050.87
B BAHAN
Wastafel Unit 1.2000 904,391.30 1,085,269.57
Semen portland Kg 6.0000 1,391.30 8,347.83
Pasir pasang M3 0.0100 117,000.00 1,170.00
Perlengkapan % 12.0000 10,947.87 131,374.49
JUMLAH HARGA BAHAN 1,226,161.88
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,652,212.75
E Overhead & Profit 15% 0.1500 247,831.91
F Harga Satuan Pekerjaan (D+E) - 1,900,044.00
A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.0000 134,347.83 806,086.96
Tukang batu L.02.03 OH 3.0000 159,652.17 478,956.52
Kepala tukang L.03.01 OH 0.3000 164,391.30 49,317.39
Mandor L.04.01 OH 0.0300 144,652.17 4,339.57
JUMLAH TENAGA KERJA 1,338,700.43
B BAHAN
Bata merah M3 150.0000 782.61 117,391.30
Semen portland Kg 120.0000 1,391.30 166,956.52
Pasir pasang M3 0.3000 117,000.00 35,100.00
Keramik 20x25 bh 20.0000 4,434.78 88,695.65
Semen warna Kg 6.0000 1,200.00 7,200.00
JUMLAH HARGA BAHAN 415,343.48
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,754,043.91
E Overhead & Profit 15% 0.1500 263,106.59
F Harga Satuan Pekerjaan (D+E) - 2,017,150.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.0000 134,347.83 403,043.48
Tukang batu L.02.03 OH 4.5000 159,652.17 718,434.78
Kepala tukang L.03.01 OH 0.0500 164,391.30 8,219.57
Mandor L.04.01 OH 0.9000 144,652.17 130,186.96
JUMLAH TENAGA KERJA 1,259,884.78
B BAHAN
Bak fibreglass Unit 1.0000 372,391.30 372,391.30
Perlengkapan % 0.1200 3,723.91 446.87
JUMLAH HARGA BAHAN 372,838.17
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,632,722.96
E Overhead & Profit 10% 0.1000 163,272.30
F Harga Satuan Pekerjaan (D+E) - 1,795,995.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0500 134,347.83 6,717.39
Tukang batu L.02.03 OH 0.5000 159,652.17 79,826.09
Kepala tukang L.03.01 OH 0.0500 164,391.30 8,219.57
Mandor L.04.01 OH 0.0250 144,652.17 3,616.30
JUMLAH TENAGA KERJA 98,379.35
B BAHAN
Bak cuci piring Unit 1.0000 840,956.52 840,956.52
Waterdrain Bh 1.0000 -
Semen portland Kg 20.0000 1,391.30 27,826.09
Pasir pasang M3 0.0500 117,000.00 5,850.00
JUMLAH HARGA BAHAN 874,632.61
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 973,011.96
E Overhead & Profit 15% 0.1500 145,951.79
F Harga Satuan Pekerjaan (D+E) - 1,118,963.00
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1600 134,347.83 290,191.30
Tukang batu L.02.03 OH 0.7200 159,652.17 114,949.57
Kepala tukang L.03.01 OH 0.0720 164,391.30 11,836.17
Mandor L.04.01 OH 0.0110 144,652.17 1,591.17
JUMLAH TENAGA KERJA 418,568.22
B BAHAN
Bata merah bh 40.0000 782.61 31,304.35
Semen portland Kg 44.0000 1,391.30 61,217.39
Pasir pasang M3 0.0700 117,000.00 8,190.00
Pasir beton M3 0.0600 117,000.00 7,020.00
Kerikil M3 0.0700 553,260.87 38,728.26
Besi Beton Kg 1.6000 13,217.39 21,147.83
JUMLAH HARGA BAHAN 167,607.83
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 586,176.04
E Overhead & Profit 15% 0.1500 87,926.41
F Harga Satuan Pekerjaan (D+E) - 674,102.00
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.2000 134,347.83 429,913.04
Tukang batu L.02.03 OH 1.1500 159,652.17 183,600.00
Kepala tukang L.03.01 OH 0.0110 164,391.30 1,808.30
Mandor L.04.01 OH 0.0160 144,652.17 2,314.43
JUMLAH TENAGA KERJA 617,635.78
B BAHAN
Bata merah bh 70.0000 782.61 54,782.61
Semen portland Kg 77.0000 1,391.30 107,130.43
Pasir pasang M3 0.1300 117,000.00 15,210.00
Pasir beton M3 0.0900 117,000.00 10,530.00
Kerikil M3 0.0200 553,260.87 11,065.22
Besi beton Kg 2.6000 13,217.39 34,365.22
JUMLAH HARGA BAHAN 233,083.48
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 850,719.26
E Overhead & Profit 15% 0.1500 127,607.89
F Harga Satuan Pekerjaan (D+E) - 978,327.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.2000 134,347.83 429,913.04
Tukang batu L.02.03 OH 1.1500 159,652.17 183,600.00
Kepala tukang L.03.01 OH 0.0110 164,391.30 1,808.30
Mandor L.04.01 OH 0.0160 144,652.17 2,314.43
JUMLAH TENAGA KERJA 617,635.78
B BAHAN
Bata merah bh 123.0000 782.61 96,260.87
Semen portland Kg 114.0000 1,391.30 158,608.70
Pasir pasang M3 0.1840 117,000.00 21,528.00
Pasir beton M3 0.1200 117,000.00 14,040.00
Kerikil M3 0.0330 553,260.87 18,257.61
Besi beton Kg 4.8500 13,217.39 64,104.35
JUMLAH HARGA BAHAN 372,799.52
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 990,435.30
E Overhead & Profit 15% 0.1500 148,565.30
F Harga Satuan Pekerjaan (D+E) - 1,139,000.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0540 134,347.83 7,254.78
Tukang batu L.02.03 OH 0.0900 159,652.17 14,368.70
Kepala tukang L.03.01 OH 0.0090 164,391.30 1,479.52
Mandor L.04.01 OH 0.0270 144,652.17 3,905.61
JUMLAH TENAGA KERJA 27,008.61
B BAHAN
Pipa galvanis 1” M 1.2000 21,456.52 25,747.83
Perlengkapan % 35.0000 257.48 9,011.74
JUMLAH HARGA BAHAN 34,759.57
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 61,768.17
E Overhead & Profit 15% 0.1500 9,265.23
F Harga Satuan Pekerjaan (D+E) - 71,033.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0360 134,347.83 4,836.52
Tukang batu L.02.03 OH 0.0600 159,652.17 9,579.13
Kepala tukang L.03.01 OH 0.0060 164,391.30 986.35
Mandor L.04.01 OH 0.0020 144,652.17 289.30
JUMLAH TENAGA KERJA 15,691.30
B BAHAN
Pipa PVC 3/4” M 1.2000 8,826.09 10,591.30
Perlengkapan % 35.0000 105.91 3,706.96
JUMLAH HARGA BAHAN 14,298.26
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 29,989.57
E Overhead & Profit 15% 0.1500 4,498.43
F Harga Satuan Pekerjaan (D+E) - 34,488.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0810 134,347.83 10,882.17
Tukang batu L.02.03 OH 0.1350 159,652.17 21,553.04
Kepala tukang L.03.01 OH 0.0135 164,391.30 2,219.28
Mandor L.04.01 OH 0.0040 144,652.17 578.61
JUMLAH TENAGA KERJA 35,233.11
B BAHAN
Pipa PVC 3” M 1.2000 55,826.09 66,991.30
Perlengkapan % 35.0000 669.91 23,446.96
JUMLAH HARGA BAHAN 90,438.26
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 125,671.37
E Overhead & Profit 15% 0.1500 18,850.71
F Harga Satuan Pekerjaan (D+E) - 144,522.00
A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 20 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0800 134,347.83 10,747.83
Tukang batu L.02.03 OH 0.0400 159,652.17 6,386.09
Kepala tukang L.03.01 OH 0.0040 164,391.30 657.57
Mandor L.04.01 OH 0.0040 144,652.17 578.61
JUMLAH TENAGA KERJA 18,370.09
B BAHAN
Pipa tanah Bh 1.6000 -
Semen portland Kg 35.0000 1,391.30 48,695.65
Pasir pasang M3 0.0140 117,000.00 1,638.00
Pasir urug M3 0.0140 117,000.00 1,638.00
JUMLAH HARGA BAHAN 51,971.65
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 70,341.74
E Overhead & Profit 15% 0.1500 10,551.26
F Harga Satuan Pekerjaan (D+E) - 80,893.00
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0600 134,347.83 8,060.87
Tukang batu L.02.03 OH 0.0300 159,652.17 4,789.57
Kepala tukang L.03.01 OH 0.0030 164,391.30 493.17
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 13,777.57
B BAHAN
Pipa tanah Bh 1.6000 -
Semen portland Kg 0.6800 1,391.30 946.09
Pasir pasang M3 0.0130 117,000.00 1,521.00
Pasir urug M3 0.0110 117,000.00 1,287.00
JUMLAH HARGA BAHAN 3,754.09
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 17,531.65
E Overhead & Profit 15% 0.1500 2,629.75
F Harga Satuan Pekerjaan (D+E) - 20,161.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.5.1.1 35. Pemasangan 1 m’ pipa beton ( Gorong - Gorong ) diameter 20 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1400 134,347.83 18,808.70
Tukang batu L.02.03 OH 0.0700 159,652.17 11,175.65
Kepala tukang L.03.01 OH 0.0070 164,391.30 1,150.74
Mandor L.04.01 OH 0.0070 144,652.17 1,012.57
JUMLAH TENAGA KERJA 32,147.65
B BAHAN
Pipa Beton Bh 1.1000 - -
Bata merah M3 0.0270 782.61 21.13
Semen portland Kg 3.9200 1,391.30 5,453.91
Pasir pasang M3 0.0560 117,000.00 6,552.00
Pasir urug M3 0.0240 117,000.00 2,808.00
JUMLAH HARGA BAHAN 14,835.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 46,982.70
E Overhead & Profit 15% 0.1500 7,047.40
F Harga Satuan Pekerjaan (D+E) - 54,030.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.5 (K3) Pemasngan 1 m pipa PVC Ø 216 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1890 134,347.83 25,391.74
Tukang pipa L.02.13 OH 0.0950 159,652.17 15,166.96
Mandor L.04.01 OH 0.0190 144,652.17 2,748.39
JUMLAH TENAGA KERJA 43,307.09
B BAHAN
Pipa PVC Ø 216 mm m 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0240 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 43,307.09
E Overhead & Profit 15% 0.1500 6,496.06
F Harga Satuan Pekerjaan (D+E) - 49,803.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.9 (K3) Pemasangan 1 m pipa PVC Ø 450 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6690 134,347.83 89,878.70
Tukang pipa L.02.13 OH 0.3350 159,652.17 53,483.48
Mandor L.04.01 OH 0.0670 144,652.17 9,691.70
JUMLAH TENAGA KERJA 153,053.87
B BAHAN
Pipa PVC Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 153,053.87
E Overhead & Profit 15% 0.1500 22,958.08
F Harga Satuan Pekerjaan (D+E) - 176,011.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.13 (K3) Pemasangan 1 m pipa PVC Ø 900 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6910 134,347.83 227,182.17
Tukang pipa L.02.13 OH 0.8460 159,652.17 135,065.74
Mandor L.04.01 OH 0.1690 144,652.17 24,446.22
JUMLAH TENAGA KERJA 386,694.13
B BAHAN
Pipa PVC Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.2620 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 386,694.13
E Overhead & Profit 15% 0.1500 58,004.12
F Harga Satuan Pekerjaan (D+E) - 444,698.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0350 134,347.83 4,702.17
Tukang pipa L.02.13 OH 0.0170 159,652.17 2,714.09
Mandor L.04.01 OH 0.0030 144,652.17 433.96
JUMLAH TENAGA KERJA 7,850.22
B BAHAN
Pipa HDPE Ø 63 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0190 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 7,850.22
E Overhead & Profit 15% 0.1500 1,177.53
F Harga Satuan Pekerjaan (D+E) - 9,027.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1020 134,347.83 13,703.48
Tukang pipa L.02.13 OH 0.0510 159,652.17 8,142.26
Mandor L.04.01 OH 0.0100 144,652.17 1,446.52
JUMLAH TENAGA KERJA 23,292.26
B BAHAN
Pipa HDPE Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0190 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 23,292.26
E Overhead & Profit 15% 0.1500 3,493.84
F Harga Satuan Pekerjaan (D+E) - 26,786.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.25 (K3) Pemasangan 1 m pipa HDPE Ø 450 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3590 134,347.83 48,230.87
Tukang pipa L.02.13 OH 0.1800 159,652.17 28,737.39
Mandor L.04.01 OH 0.0360 144,652.17 5,207.48
JUMLAH TENAGA KERJA 82,175.74
B BAHAN
Pipa HDPE Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.2000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 82,175.74
E Overhead & Profit 15% 0.1500 12,326.36
F Harga Satuan Pekerjaan (D+E) - 94,502.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.29 (K3) Pemasangan 1 m pipa HDPE Ø 900 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.3530 134,347.83 181,772.61
Tukang pipa L.02.13 OH 0.6770 159,652.17 108,084.52
Mandor L.04.01 OH 0.1350 144,652.17 19,528.04
JUMLAH TENAGA KERJA 309,385.17
B BAHAN
Pipa HDPE Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.8830 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 309,385.17
E Overhead & Profit 15% 0.1500 46,407.78
F Harga Satuan Pekerjaan (D+E) - 355,792.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP Ø 63 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3450 134,347.83 46,350.00
Tukang pipa L.02.13 OH 0.1720 159,652.17 27,460.17
Mandor L.04.01 OH 0.0340 144,652.17 4,918.17
JUMLAH TENAGA KERJA 78,728.35
B BAHAN
Pipa GIP Ø 63 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0380 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 78,728.35
E Overhead & Profit 15% 0.1500 11,809.25
F Harga Satuan Pekerjaan (D+E) - 90,537.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7960 134,347.83 106,940.87
Tukang pipa L.02.13 OH 0.3980 159,652.17 63,541.57
Mandor L.04.01 OH 0.0800 144,652.17 11,572.17
JUMLAH TENAGA KERJA 182,054.61
B BAHAN
Pipa GIP Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0420 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 182,054.61
E Overhead & Profit 15% 0.1500 27,308.19
F Harga Satuan Pekerjaan (D+E) - 209,362.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.41 (K3) Pemasangan 1 m pipa GIP Ø 450 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.3530 134,347.83 181,772.61
Tukang pipa L.02.13 OH 0.6760 159,652.17 107,924.87
Mandor L.04.01 OH 0.1350 144,652.17 19,528.04
JUMLAH TENAGA KERJA 309,225.52
B BAHAN
Pipa GIP Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0575 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 309,225.52
E Overhead & Profit 15% 0.1500 46,383.83
F Harga Satuan Pekerjaan (D+E) - 355,609.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.45 (K3) Pemasangan 1 m pipa GIP Ø 900 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.6230 134,347.83 352,394.35
Tukang pipa L.02.13 OH 1.3120 159,652.17 209,463.65
Mandor L.04.01 OH 0.2620 144,652.17 37,898.87
JUMLAH TENAGA KERJA 599,756.87
B BAHAN
Pipa GIP Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0863 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 599,756.87
E Overhead & Profit 15% 0.1500 89,963.53
F Harga Satuan Pekerjaan (D+E) - 689,720.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.49 (K3) Pemasangan 1 m pipa DCI Ø 100 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.4890 134,347.83 65,696.09
Tukang pipa L.02.13 OH 0.0980 159,652.17 15,645.91
Mandor L.04.01 OH 0.0490 144,652.17 7,087.96
JUMLAH TENAGA KERJA 88,429.96
B BAHAN
Pipa DCI Ø 100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3800 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 88,429.96
E Overhead & Profit 15% 0.1500 13,264.49
F Harga Satuan Pekerjaan (D+E) - 101,694.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.53 (K3) Pemasangan 1 m pipa DCI Ø 250 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.9510 134,347.83 127,764.78
Tukang pipa L.02.13 OH 0.1900 159,652.17 30,333.91
Mandor L.04.01 OH 0.0950 144,652.17 13,741.96
JUMLAH TENAGA KERJA 171,840.65
B BAHAN
Pipa DCI Ø 250 mm M 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0500 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 171,840.65
E Overhead & Profit 15% 0.1500 25,776.10
F Harga Satuan Pekerjaan (D+E) - 197,616.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.57 (K3) Pemasangan 1 m pipa DCI Ø 500 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.0470 134,347.83 275,010.00
Tukang pipa L.02.13 OH 0.4090 159,652.17 65,297.74
Operator alat berat L.08.01 OH 0.1930 - -
Mandor L.04.01 OH 0.2050 144,652.17 29,653.70
JUMLAH TENAGA KERJA 369,961.43
B BAHAN
Pipa DCI Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0340 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.0450 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 232,456.43
E Overhead & Profit 15% 0.1500 34,868.47
F Harga Satuan Pekerjaan (D+E) - 267,324.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.61 (K3) Pemasangan 1 m pipa DCI Ø1000 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5.9310 134,347.83 796,816.96
Tukang pipa L.02.13 OH 1.1860 159,652.17 189,347.48
Operator alat berat L.08.01 OH 0.7930 - -
Mandor L.04.01 OH 0.6930 144,652.17 100,243.96
JUMLAH TENAGA KERJA 1,086,408.39
B BAHAN
Pipa DCI Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.1120 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.2980 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 687,999.91
E Overhead & Profit 15% 0.1500 103,199.99
F Harga Satuan Pekerjaan (D+E) - 791,199.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.65 (K3) Pemasangan 1 m pipa baja Ø 100 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5790 134,347.83 77,787.39
Tukang pipa L.02.13 OH 0.1160 159,652.17 18,519.65
Mandor L.04.01 OH 0.0580 144,652.17 8,389.83
JUMLAH TENAGA KERJA 104,696.87
B BAHAN
Pipa Baja Ø 100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 104,696.87
E Overhead & Profit 15% 0.1500 15,704.53
F Harga Satuan Pekerjaan (D+E) - 120,401.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.69 (K3) Pemasangan pipa baja Ø 250 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.3250 134,347.83 178,010.87
Tukang pipa L.02.13 OH 0.2650 159,652.17 42,307.83
Mandor L.04.01 OH 0.1330 144,652.17 19,238.74
JUMLAH TENAGA KERJA 239,557.43
B BAHAN
Pipa Baja Ø 250 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 239,557.43
E Overhead & Profit 15% 0.1500 35,933.62
F Harga Satuan Pekerjaan (D+E) - 275,491.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.73 (K3) Pemasangan 1 m pipa baja Ø 500 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.4320 134,347.83 326,733.91
Tukang pipa L.02.13 OH 0.4860 159,652.17 77,590.96
Mandor L.04.01 OH 0.2430 144,652.17 35,150.48
JUMLAH TENAGA KERJA 439,475.35
B BAHAN
Pipa Baja Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0290 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.0450 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 439,475.35
E Overhead & Profit 15% 0.1500 65,921.30
F Harga Satuan Pekerjaan (D+E) - 505,396.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.1.77 (K3) Pemasangan 1 m pipa baja Ø 1000 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.8950 134,347.83 657,632.61
Tukang pipa L.02.13 OH 0.9790 159,652.17 156,299.48
Mandor L.04.01 OH 0.4890 144,652.17 70,734.91
JUMLAH TENAGA KERJA 884,667.00
B BAHAN
Pipa Baja Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.0580 -
Sewa Tripot/Tackel & handle crane 2 T hari 0.1330 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 884,667.00
E Overhead & Profit 15% 0.1500 132,700.05
F Harga Satuan Pekerjaan (D+E) - 1,017,367.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.3.2 (K3) Pemasangan 1 buah Valve Ø 200 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.7140 134,347.83 230,272.17
Tukang pipa L.02.13 OH 0.8570 159,652.17 136,821.91
Mandor L.04.01 OH 0.1710 144,652.17 24,735.52
JUMLAH TENAGA KERJA 391,829.61
B BAHAN
Valve Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 391,829.61
E Overhead & Profit 15% 0.1500 58,774.44
F Harga Satuan Pekerjaan (D+E) - 450,604.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.3.6 (K3) Pemasangan 1 buah Valve Ø 450 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4290 134,347.83 460,678.70
Tukang pipa L.02.13 OH 1.7150 159,652.17 273,803.48
Mandor L.04.01 OH 0.3430 144,652.17 49,615.70
JUMLAH TENAGA KERJA 784,097.87
B BAHAN
Valve Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.0000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 784,097.87
E Overhead & Profit 15% 0.1500 117,614.68
F Harga Satuan Pekerjaan (D+E) - 901,712.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.3.10 (K3) Pemasangan 1 buah Valve Ø 800 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.7860 134,347.83 239,945.22
Tukang pipa L.02.13 OH 0.8930 159,652.17 142,569.39
Mandor L.04.01 OH 0.1790 144,652.17 25,892.74
JUMLAH TENAGA KERJA 408,407.35
B BAHAN
Valve Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.5000 -
Mobile crane =< 3 ton hari 0.5000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 408,407.35
E Overhead & Profit 15% 0.1500 61,261.10
F Harga Satuan Pekerjaan (D+E) - 469,668.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.3.14 (K3) Pemasangan 1 buah Valve Ø 1200 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.0000 134,347.83 403,043.48
Tukang pipa L.02.13 OH 1.5000 159,652.17 239,478.26
Mandor L.04.01 OH 0.3000 144,652.17 43,395.65
JUMLAH TENAGA KERJA 685,917.39
B BAHAN
Valve Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.0000 -
Mobile crane =< 3 ton hari 1.0000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 685,917.39
E Overhead & Profit 15% 0.1500 102,887.61
F Harga Satuan Pekerjaan (D+E) - 788,805.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.3.18 (K3) Pemasangan 1 buah Tee Ø 300 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.4360 134,347.83 58,575.65
Tukang pipa L.02.13 OH 0.2180 159,652.17 34,804.17
Mandor L.04.01 OH 0.0440 144,652.17 6,364.70
JUMLAH TENAGA KERJA 99,744.52
B BAHAN
Tee Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.5000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 99,744.52
E Overhead & Profit 15% 0.1500 14,961.68
F Harga Satuan Pekerjaan (D+E) - 114,706.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.3.22 (K3) Pemasangan 1 buah Tee Ø 600 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0960 134,347.83 147,245.22
Tukang pipa L.02.13 OH 0.5480 159,652.17 87,489.39
Mandor L.04.01 OH 0.1100 144,652.17 15,911.74
JUMLAH TENAGA KERJA 250,646.35
B BAHAN
Tee Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.1930 -
Mobile crane =< 3 ton hari 0.0960 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 250,646.35
E Overhead & Profit 15% 0.1500 37,596.95
F Harga Satuan Pekerjaan (D+E) - 288,243.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.3.27 (K3) Pemasangan 1 buah Tee Ø 1100 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1960 134,347.83 295,027.83
Tukang pipa L.02.13 OH 1.0980 159,652.17 175,298.09
Mandor L.04.01 OH 0.2200 144,652.17 31,823.48
JUMLAH TENAGA KERJA 502,149.39
B BAHAN
Tee Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.3860 -
Mobile crane =< 3 ton hari 0.1930 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 502,149.39
E Overhead & Profit 15% 0.1500 75,322.41
F Harga Satuan Pekerjaan (D+E) - 577,471.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
Pemasangan
A.4.6.2.2. 1 buah kunci tanam biasa
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0100 134,347.83 1,343.48
Tukang kayu L.02.04 OH 0.5000 159,652.17 79,826.09
Kepala tukang L.03.01 OH 0.0500 164,391.30 8,219.57
Mandor L.04.01 OH 0.0050 144,652.17 723.26
JUMLAH TENAGA KERJA 90,112.39
B BAHAN
Kunci tanam biasa Bh 1.0000 158,000.00 158,000.00
JUMLAH HARGA BAHAN 158,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 248,112.39
E Overhead & Profit 10% 0.1500 37,216.86
F Harga Satuan Pekerjaan (D+E) - 285,329.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.2.5. Pemasangan 1 buah engsel pintu ARCT Kuningan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0150 134,347.83 2,015.22
Tukang kayu L.02.04 OH 0.1500 159,652.17 23,947.83
Kepala tukang L.03.01 OH 0.0150 164,391.30 2,465.87
Mandor L.04.01 OH 0.0008 144,652.17 115.72
JUMLAH TENAGA KERJA 28,544.63
B BAHAN
Engsel pintu Bh 1.0000 26,565.22 26,565.22
JUMLAH HARGA BAHAN 26,565.22
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 55,109.85
E Overhead & Profit 15% 0.1500 8,266.48
F Harga Satuan Pekerjaan (D+E) - 63,376.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.2.9. Pemasangan 1 buah Tarikan Jendela
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0150 134,347.83 2,015.22
Tukang kayu L.02.04 OH 0.1500 159,652.17 23,947.83
Kepala tukang L.03.01 OH 0.0150 164,391.30 2,465.87
Mandor L.04.01 OH 0.0080 144,652.17 1,157.22
JUMLAH TENAGA KERJA 29,586.13
B BAHAN
Tarikan Jendela Bh 1.0000 27,652.17 27,652.17
JUMLAH HARGA BAHAN 27,652.17
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 57,238.30
E Overhead & Profit 15% 0.1500 8,585.75
F Harga Satuan Pekerjaan (D+E) - 65,824.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.2.13. Pemasangan 1 buah door stop
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0100 134,347.83 1,343.48
Tukang kayu L.02.04 OH 0.1000 159,652.17 15,965.22
Kepala tukang L.03.01 OH 0.0100 164,391.30 1,643.91
Mandor L.04.01 OH 0.0050 144,652.17 723.26
JUMLAH TENAGA KERJA 19,675.87
B BAHAN
Door stop Bh 1.0000 110,000.00 110,000.00
JUMLAH HARGA BAHAN 110,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 129,675.87
E Overhead & Profit 15% 0.1500 19,451.38
F Harga Satuan Pekerjaan (D+E) - 149,127.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0150 134,347.83 2,015.22
Tukang kayu L.02.04 OH 0.1500 159,652.17 23,947.83
Kepala tukang L.03.01 OH 0.0150 164,391.30 2,465.87
Mandor L.04.01 OH 0.0008 144,652.17 115.72
JUMLAH TENAGA KERJA 28,544.63
B BAHAN
Kaca tebal 5 mm m2 1.1000 122,347.83 134,582.61
SEalant Kg 0.0500 75,000.00 3,750.00
JUMLAH HARGA BAHAN 138,332.61
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 166,877.24
E Overhead & Profit 15% 0.1500 25,031.59
F Harga Satuan Pekerjaan (D+E) - 191,908.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.3.17. Pemasangan 1 m’ plint Keramik ukuran 10cm x 30cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA -
Pekerja L.01.01 OH 0.0900 134,347.83 12,091.30
Tukang Batu L.02.03 OH 0.0900 159,652.17 14,368.70
Kepala tukang L.03.01 OH 0.0090 164,391.30 1,479.52
Mandor L.04.01 OH 0.0050 144,652.17 723.26
JUMLAH TENAGA KERJA 28,662.78
B BAHAN
Plint Keramik ukuran 10cm x 30cm Bh 3.5300 14,043.48 49,573.48
Semen portland kg 1.2400 1,391.30 1,725.22
Pasir Pasang M3 0.0030 117,000.00 351.00
JUMLAH HARGA BAHAN 51,649.70
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 80,312.48
E Overhead & Profit 15% 0.1500 12,046.87
F Harga Satuan Pekerjaan (D+E) - 92,359.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7500 134,347.83 100,760.87
Tukang Batu L.02.03 OH 0.7500 159,652.17 119,739.13
Kepala tukang L.03.01 OH 0.0750 164,391.30 12,329.35
Mandor L.04.01 OH 0.0380 144,652.17 5,496.78
JUMLAH TENAGA KERJA 238,326.13
B BAHAN
Plint internal cove artistik 5cm x 5cm x 20cm Bh 5.3000 -
Semen portland Kg 1.1400 -
Pasir Pasang M3 0.0030 -
Semen Warna Kg 0.1000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 238,326.13
E Overhead & Profit 15% 0.1500 35,748.92
F Harga Satuan Pekerjaan (D+E) - 274,075.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.3.53. Pemasangan 1 m2 dinding keramik 20cm x 25cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.9000 134,347.83 120,913.04
Tukang Batu L.02.03 OH 0.4500 159,652.17 71,843.48
Kepala tukang L.03.01 OH 0.0450 164,391.30 7,397.61
Mandor L.04.01 OH 0.0450 144,652.17 6,509.35
JUMLAH TENAGA KERJA 206,663.48
B BAHAN
keramik Dinding 10cm x 20cm Bh 20.0000 4,434.78 88,695.65
Semen portland Kg 9.3000 1,391.30 12,939.13
Pasir Pasang M3 0.0180 117,000.00 2,106.00
Semen Warna Kg 2.7500 1,200.00 3,300.00
JUMLAH HARGA BAHAN 107,040.78
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 313,704.26
E Overhead & Profit 15% 0.1500 47,055.64
F Harga Satuan Pekerjaan (D+E) - 360,759.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 134,347.83 20,152.17
Tukang Batu L.02.03 OH 0.1500 159,652.17 23,947.83
Kepala tukang L.03.01 OH 0.0150 164,391.30 2,465.87
Mandor L.04.01 OH 0.0080 144,652.17 1,157.22
JUMLAH TENAGA KERJA 47,723.09
B BAHAN
Vynil ukuran 30cm x 30cm Bh 11.8700 -
Lem Kayu/Karet Kg 0.3500 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 47,723.09
E Overhead & Profit 10% 0.1000 4,772.31
F Harga Satuan Pekerjaan (D+E) - 52,495.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1200 134,347.83 16,121.74
Tukang Batu L.02.03 OH 0.1200 159,652.17 19,158.26
Kepala tukang L.03.01 OH 0.0120 164,391.30 1,972.70
Mandor L.04.01 OH 0.0060 144,652.17 867.91
JUMLAH TENAGA KERJA 38,120.61
B BAHAN
Kayu Papan kelas I M3 0.0030 4,681,565.22 14,044.70
Paku skrup Kg 0.0500 17,556.52 877.83
JUMLAH HARGA BAHAN 14,922.52
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 53,043.13
E Overhead & Profit 15% 0.1500 7,956.47
F Harga Satuan Pekerjaan (D+E) - 60,999.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.4.3.67. Pemasangan 1 m2 paving block berwarna tebal 8 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5000 134,347.83 67,173.91
Tukang Batu L.02.03 OH 0.5000 159,652.17 79,826.09
Kepala tukang L.03.01 OH 0.0050 164,391.30 821.96
Mandor L.04.01 OH 0.0013 144,652.17 188.05
JUMLAH TENAGA KERJA 148,010.00
B BAHAN
Paving block 8 cm berwarna M2 1.0100 -
Pasir beton M3 0.0700 117,000.00 8,190.00
JUMLAH HARGA BAHAN 8,190.00
C PERALATAN -
Peralatan Kerja Paving Blok % 0.1000 8,190.00 819.00
JUMLAH HARGA ALAT 819.00
D Jumlah (A+B+C) - 157,019.00
E Overhead & Profit 15% 0.1500 23,552.85
F Harga Satuan Pekerjaan (D+E) - 180,571.00
A.4.4.3.68.
Pemasangan 1 M2 Aluminium Composite Panel
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 134,347.83 20,152.17
Tukang Besi L.02.05 OH 0.0750 159,652.17 11,973.91
Kepala Tukang L.03.01 OH 0.0080 164,391.30 1,315.13
Mandor L.04.01 OH 0.0080 144,652.17 1,157.22
JUMLAH TENAGA KERJA 34,598.43
B BAHAN
Aluminium Composite Panel Lbr 0.3650 -
Screw bh 20.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 34,598.43
E Overhead & Profit 15% 0.1500 5,189.77
F Harga Satuan Pekerjaan (D+E) - 39,788.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
2.777778
0.277778 1.6
3.6
0.625
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0500 134,347.83 141,065.22
Tukang Las L.02.11 OH 1.0500 164,391.30 172,610.87
Kepala tukang L.03.01 OH 0.1050 164,391.30 17,261.09
Mandor L.04.01 OH 0.0520 144,652.17 7,521.91
JUMLAH TENAGA KERJA 338,459.09
B BAHAN
Besi siku L 30.30.3 Kg 15.0000 82,956.52 1,244,347.83
Besi plat baja Kg 32.8000 -
Kawat las Kg 0.0500 -
JUMLAH HARGA BAHAN 1,244,347.83
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,582,806.91
E Overhead & Profit 15% 0.1500 237,421.04
F Harga Satuan Pekerjaan (D+E) - 1,820,227.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0400 134,347.83 5,373.91
Tukang Besi Konstruksi L.02.06 OH 0.0200 164,391.30 3,287.83
Kepala tukang L.03.01 OH 0.0020 164,391.30 328.78
Mandor L.04.01 OH 0.0020 144,652.17 289.30
JUMLAH TENAGA KERJA 9,279.83
B BAHAN
Kawat las listrik Kg 0.4000 -
Solar Liter 0.3000 12,478.26 3,743.48
Minyak pelumas Liter 0.0400 38,695.65 1,547.83
JUMLAH HARGA BAHAN 5,291.30
C PERALATAN
Sewa alat Las Listrik Jam 0.1700 250,000.00 42,500.00
JUMLAH HARGA ALAT 42,500.00
D Jumlah (A+B+C) - 57,071.13
E Overhead & Profit 15% 0.1500 8,560.67
F Harga Satuan Pekerjaan (D+E) - 65,631.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0800 134,347.83 10,747.83
Tukang L.02.01 OH 0.8000 159,652.17 127,721.74
Kepala tukang L.03.01 OH 0.0800 164,391.30 13,151.30
Mandor L.04.01 OH 0.0040 144,652.17 578.61
JUMLAH TENAGA KERJA 152,199.48
B BAHAN
Sunscreen alluminium m2 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 152,199.48
E Overhead & Profit 15% 0.1500 22,829.92
F Harga Satuan Pekerjaan (D+E) - 175,029.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0850 134,347.83 11,419.57
Tukang Alumunium L.02.02 OH 0.0850 159,652.17 13,570.43
Kepala tukang L.03.01 OH 0.0090 164,391.30 1,479.52
Mandor L.04.01 OH 0.0050 144,652.17 723.26
JUMLAH TENAGA KERJA 27,192.78
B BAHAN
Pintu alluminium m 4.4000 -
Profil kaca m 4.5000 -
Sealant Tube 0.2700 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 27,192.78
E Overhead & Profit 15% 0.1500 4,078.92
F Harga Satuan Pekerjaan (D+E) - 31,271.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
Pemasangan
A.4.2.1.17. 1 m2 jendela nako & tralis
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 134,347.83 26,869.57
Tukang L.02.01 OH 0.2000 159,652.17 31,930.43
Kepala tukang L.03.01 OH 0.0200 164,391.30 3,287.83
Mandor L.04.01 OH 0.0010 144,652.17 144.65
JUMLAH TENAGA KERJA 62,232.48
B BAHAN
Jendela nako (rangka + kaca 5 mm) m2 1.1000 -
Paku skrup buah 10.0000 -
Besi strip m 7.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 62,232.48
E Overhead & Profit 10% 0.1000 6,223.25
F Harga Satuan Pekerjaan (D+E) - 68,455.00
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 134,347.83 20,152.17
Tukang L.02.01 OH 0.3000 159,652.17 47,895.65
Kepala tukang L.03.01 OH 0.0300 164,391.30 4,931.74
Mandor L.04.01 OH 0.0080 144,652.17 1,157.22
JUMLAH TENAGA KERJA 74,136.78
B BAHAN
Seng plat m 1.0500 22,217.39 23,328.26
Paku Biasa kg 0.0100 19,918.26 199.18
Besi strip kg 0.5000 -
JUMLAH HARGA BAHAN 23,527.44
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 97,664.23
E Overhead & Profit 15% 0.1500 14,649.63
F Harga Satuan Pekerjaan (D+E) - 112,313.00
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 134,347.83 33,586.96
Tukang Besi L.02.05 OH 0.2500 159,652.17 39,913.04
Kepala Tukang L.03.01 OH 0.0250 164,391.30 4,109.78
Mandor L.04.01 OH 0.0130 144,652.17 1,880.48
JUMLAH TENAGA KERJA 79,490.26
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.5000 35,108.70 122,880.43
Assesoris (perkuatan, las dll) Ls 1.0000 35,108.70 35,108.70
JUMLAH HARGA BAHAN 157,989.13
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 237,479.39
E Overhead & Profit 15% 0.1500 35,621.91
F Harga Satuan Pekerjaan (D+E) - 273,101.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 134,347.83 47,021.74
Tukang Besi L.02.05 OH 0.3500 159,652.17 55,878.26
Kepala Tukang L.03.01 OH 0.0350 164,391.30 5,753.70
Mandor L.04.01 OH 0.0180 144,652.17 2,603.74
JUMLAH TENAGA KERJA 111,257.43
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.0000 35,108.70 140,434.78
Assesoris (perkuatan, las dll) Ls 1.0000 140,434.78 140,434.78
JUMLAH HARGA BAHAN 280,869.57
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 392,127.00
E Overhead & Profit 15% 0.1500 58,819.05
F Harga Satuan Pekerjaan (D+E) - 450,946.00
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canal dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7340 134,347.83 98,611.30
Tukang Besi L.02.05 OH 0.7340 159,652.17 117,184.70
Kepala Tukang L.03.01 OH 0.0730 164,391.30 12,000.57
Mandor L.04.01 OH 0.0370 144,652.17 5,352.13
JUMLAH TENAGA KERJA 233,148.70
B BAHAN
Baja ringan canai dingin C75 kg 3.0650 176,600.00 541,279.00
Genteng Metal Biasa
JUMLAH HARGA BAHAN 541,279.00
C PERALATAN - -
Alat Rangka Atap Baja Canai Dingin 0.1000 54,127.90
JUMLAH HARGA ALAT 54,127.90
D Jumlah (A+B+C) - 828,555.60
E Overhead & Profit 15% 0.1500 124,283.34
F Harga Satuan Pekerjaan (D+E) - 952,838.00
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canal dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7604 134,347.83 102,158.09
Tukang Besi L.02.05 OH 0.7604 159,652.17 121,399.51
Kepala Tukang L.03.01 OH 0.0760 164,391.30 12,493.74
Mandor L.04.01 OH 0.0380 144,652.17 5,496.78
JUMLAH TENAGA KERJA 241,548.12
B BAHAN
Baja ringan canai dingin C75 kg 4.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 241,548.12
E Overhead & Profit 15% 0.1500 36,232.22
F Harga Satuan Pekerjaan (D+E) - 277,780.00
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
Dinas Perumahan dan Kawasan Permukiman Kabupaten Musi Banyuasin TA. 2018
A.4.5.1.10.Pemasangan 1 m2 Plafond PVC
No Uraian Kode
A TENAGA
Pekerja L.01.01
Tukang Kayu L.02.04
Kepala tukang L.03.01
Mandor L.04.01
B BAHAN
Plafond PVC (setara Shunda Plafon,
Flat Gloss Half Silver)
Screw
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)
B BAHAN
List PVC (setara Shunda Plafon,LS
301-1 Min.Silver Metalic)
Screw
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.24.Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/
No Uraian Kode
A TENAGA
Pekerja L.01.01
Tukang Besi L.02.05
Kepala Tukang L.03.01
Mandor L.04.01
B BAHAN
Baja ringan canai dingin C75
Baut (Srew driver)
Dynabol dia 12 x 120 mm
Reng Canai Dingin
Talang / Jurai Canai Dingin
C PERALATAN
Alat Rangka Atap Baja Canai Dingin
D Jumlah (A+B+C)
E Overhead & Profit 15%
F Harga Satuan Pekerjaan (D+E)
B BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Harga Satuan Pekerjaan (D+E)
Satuan Koefisien Harga Satuan (Rp.)
OH 0.1500 134,347.83
OH 0.2500 159,652.17
OH 0.0250 164,391.30
OH 0.0750 144,652.17
JUMLAH TENAGA KERJA
m2 1.0500
bh 18.0000
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
0.1500
-
OH 0.1000 134,347.83
OH 0.0500 159,652.17
OH 0.0050 164,391.30
OH 0.0050 144,652.17
JUMLAH TENAGA KERJA
M' 1.0500
bh 6.0000
JUMLAH HARGA BAHAN
-
JUMLAH HARGA ALAT
-
0.1500
-
OH 0.2000 134,347.83
OH 0.4500 159,652.17
OH 0.0100 164,391.30
OH 0.0500 144,652.17
JUMLAH TENAGA KERJA
M' 3.7200
bh 28.0000
bh 2.0000
M' 5.4000
M' 0.1240
JUMLAH HARGA BAHAN
0.1000
JUMLAH HARGA ALAT
-
0.1500
-
m2 8.0000 563,553.00
kg 110.0000 18,049.40
m3 1.0000 1,419,630.00
JUMLAH TENAGA KERJA
20,152.17
39,913.04
4,109.78
10,848.91
75,023.91
-
-
-
-
-
75,023.91
11,253.59
86,277.00
13,434.78
7,982.61
821.96
723.26
22,962.61
-
-
-
-
-
22,962.61
3,444.39
26,407.00
26,869.57
71,843.48
1,643.91
7,232.61
107,589.57
-
-
-
-
-
-
-
-
107,589.57
16,138.43
123,728.00
4,508,424.00
1,985,434.00
1,419,630.00
7,913,488.00
-
-
-
7,913,488.00
7,913,488.00