DIBULATKAN 199,500,000.00
Terbilang :
Seratus Sembilan Puluh Sembilan Juta Lima Ratus Ribu Rupiah
Dibuat Oleh :
Konsultan Perencana
CV. ASKANA JAVA
A PEKERJAAN PERSIAPAN
1 Manajemen Keselamatan dan Kesehatan Kerja (SMK) 1.00 Pkt 2,940,000.00 11 3,263,400.00
JUMLAH B 3,263,400.00
C PEKERJAAN KONSTRUKSI
JUMLAH I 4,519,293.41
II PEKERJAAN PONDASI
Page 5
HARGA SATUAN PPN
NO URAIAN PEKERJAAN VOL. SAT. JUMLAH HARGA (Rp)
(Rp) 11 %
1 2 3 4 5 6 7 = (3X5)+(3X5X6)/100
E PEKERJAAN SANITAIR
I PASANGAN PIPA 1/2"AERASI/AERATOR - POMPA UDARA
1 - Pipa 1/2" AW 49.80 m1 23,214.89 11 1,283,272.63
2 - Elbow 90° 1/2" AW 27.00 bh 12,099.39 11 362,618.69
3 - Tee 1/2" AW 15.00 bh 12,099.39 11 201,454.83
4 - Socket drat dalam kuningan 1/2" AW 21.00 bh 26,399.39 11 615,369.76
5 - Konektor Selang kuningan 1/2 " 21.00 bh 25,635.50 11 597,563.51
6 - Pompa Aerator 3.00 unit 486,530.00 11 1,620,144.90
Sub Jumlah I 4,680,424.30
II PASANGAN PIPA GALVANIS 1 " DARI BACKWASH
1 - Pipa 1" AW 18.15 m1 34,233.22 11 689,679.61
2 - Elbow 90° 1 AW 6.00 bh 15,307.72 11 101,949.43
3 - Tee 1 AW 9.00 bh 17,507.72 11 174,902.15
4 - Gate Valve 1 inch 15.00 bh 39,293.22 11 654,232.15
5 - Pompa Sunsun CEF 22000 95 Watt 3.00 unit 2,114,530.00 11 7,041,384.90
Sub Jumlah II 8,662,148.24
III PASANGAN PIPA 3" SKIMMER AREA KOLAM
1 - Pipa 3" AW 21.15 m1 87,644.33 11 2,057,582.19
2 - Elbow 90° 3" AW 12.00 bh 54,418.83 11 724,858.86
3 - Tee 3" AW 3.00 bh 59,918.83 11 199,529.72
4 - Socket 3" AW 6.00 bh 45,924.39 11 305,856.43
5 - Skimmer 4 ke 3" AW 6.00 bh 108,068.89 11 719,738.80
Sub Jumlah III 4,007,566.00
IV PASANGAN PIPA 3" PEMBUANGAN CHAMBER
1 - Pipa 3" AW 66.30 m1 87,644.33 11 6,450,009.42
2 - Elbow 90° 3" AW 24.00 bh 54,418.83 11 1,449,717.72
Sub Jumlah IV 7,899,727.14
V FILTER BAK CHAMBER
KOLAM 1
1 Bak Chamber Mekanis 1 1.00 unit 6,172,100.00 11 6,851,031.00
2 Bak Chamber Mekanis 2 1.00 unit 2,529,230.00 11 2,807,445.30
3 Bak Chamber Biologis 1.00 unit 2,166,686.50 11 2,405,022.02
4 Bak Chamber Kimiawi 1.00 unit 1,230,366.50 11 1,365,706.82
KOLAM 2
1 Bak Chamber Mekanis 1 1.00 unit 6,172,100.00 11 6,851,031.00
2 Bak Chamber Mekanis 2 1.00 unit 2,529,230.00 11 2,807,445.30
3 Bak Chamber Biologis 1.00 unit 2,166,686.50 11 2,405,022.02
4 Bak Chamber Kimiawi 1.00 unit 1,230,366.50 11 1,365,706.82
KOLAM 3
1 Bak Chamber Mekanis 1 1.00 unit 6,172,100.00 11 6,851,031.00
2 Bak Chamber Mekanis 2 1.00 unit 2,529,230.00 11 2,807,445.30
3 Bak Chamber Biologis 1.00 unit 2,166,686.50 11 2,405,022.02
4 Bak Chamber Kimiawi 1.00 unit 1,230,366.50 11 1,365,706.82
Sub Jumlah V 40,287,615.39
VI PASANGAN PIPA 4" AREA BOTTOM DRAIN
1 - Pipa 4" AW 33.30 m1 123,589.89 11 4,568,253.06
2 - Elbow 90° 4" AW 21.00 bh 62,209.89 11 1,450,112.51
3 - Bottom Drain 4" AW 6.00 unit 176,330.00 11 1,174,357.80
Sub Jumlah VI 7,192,723.37
VII PASANGAN PIPA 4" SIRKULASI CHAMBER
1 - Pipa 4" AW 35.10 m1 123,589.89 11 4,815,185.66
2 - Elbow 90° 4" AW 27.00 bh 62,209.89 11 1,864,430.37
Sub Jumlah VII 6,679,616.03
VIII PASANGAN PIPA 4" PEMBUANGAN
1 - Pipa 4" AW 13.80 m1 123,589.89 11 1,893,149.92
2 -Tee 4" AW 2.00 bh 67,709.89 11 150,315.95
3 - Elbow 90° 4" AW 2.00 bh 62,209.89 11 138,105.95
Sub Jumlah VIII 2,181,571.82
IX PASANGAN PIPA 1 DARI SUMBER AIR
1 - Pipa 1" AW 6.00 m1 34,233.22 11 227,993.26
Sub Jumlah IX 227,993.26
JUMLAH E 81,819,385.55
F PEKERJAAN ELEKTRIKAL
1 Pek. Inst. Stop Kontak 6.00 bh 112,596.00 11 749,889.36
2 Pek. Stop kontak 6.00 bh 40,000.00 11 266,400.00
JUMLAH F 1,016,289.36
Page 6
HARGA SATUAN PPN
NO URAIAN PEKERJAAN VOL. SAT. JUMLAH HARGA (Rp)
(Rp) 11 %
1 2 3 4 5 6 7 = (3X5)+(3X5X6)/100
Page 7
-
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
-
101 Aerator Koi Sunsun Yuting ACO 001 Pompa Udara Air Pump Kolam Ikan Unit 395,000.00
102 Tatakan Alas Dasar Chamber Media Filter Kolam Koi 100X50X3 m2 360,000.00
103 Japmat Japmate Media Filter Mekanis Kolam Koi 200x100x3.8 m2 415,000.00
104 Media filter kolam koi batu apung kg 25,000.00
105 Kulit kerang Oyster shell 1kg kantong waring media filter kolam koi kg 15,000.00
106 Waring ikan m2 10,000.00
107 Pipa listrik 5/8” Btg 12,000.00
108 Kabel M¹ 10,000.00
NO BAHAN SATUAN HARGA (Rp) KET
109 T Dus Buah 3,500.00
110 L Bow Buah 2,500.00
111 Klem biasa Buah 100.00
112 MCCB (Boks MCB) Buah 100,000.00
113 MCB Buah 35,000.00
114 Exshaus fan unit 215,000.00
115 Saklar Broko Tunggal Standard ( 1 Phase ) bh 20,000.00
116 Saklar Broko Seri Standard ( 1 Phase ) bh 25,000.00
117 Stop Kontak Broko Standard ( 1 Phase ) bh 25,000.00
118 Stop Kontak Broko Standard ( 3 Phase ) bh 22,800.00
119 Lampu Pijar 25 watt + Amature bh 11,500.00
120 Lampu SL 25 watt + Amature bh 40,300.00
121 Lampu TL 40 watt + Amature bh 73,900.00
122 Lampu led 7 watt bh 65,000.00
123 Lampu led 5 watt bh 45,000.00
124 Downlight PHILIPS 44082 LED 3.5" 7W - Lis Putih bh 100,000.00
125 Lampu Baret Kotak bh 250,000.00
126 Kabel NYM 3 x 2,5 Prima rol 326,000.00
127 NCB 4 Amper MG bh 60,000.00
128 NCB 6 Amper MG bh 75,000.00
129 NCB 10 Amper MG bh 80,000.00
130 NCB 16 Amper MG bh 90,000.00
131 Kabel NYM 3 x 1,5 Prima Rol/50m 228,400.00
132 Kabel NYM 2 X 2,5 mm2 Rol/50m 340,000.00
133 Kabel NYM 3 X 2,5 mm2 Rol/50m 422,000.00
134 Kabel NYM 4 x 2,5 Prima Rol/50m 391,500.00
135 Bok Panel PVC bh 15,000.00
136 Pipa Pvc 5/8 " btg 12,500.00
137 Mangkok Listrik bh 2,500.00
138 Klem Kabel bh 100.00
139 Klem Pipa bh 500.00
140 Isolasi bh 5,000.00
141 T Dus bh 3,500.00
142 L Bow bh 2,500.00
143 Las Dop bh 2,500.00
144 Fiiting lampu bh 10,000.00
145 Socket Pipa bh 1,200.00
146 Pipa Listrik btg 6,000.00
147 Lampu RM 2 x 18 Watt + Komponen Philips bh 350,000.00
148 Fsiher bh 1,200.00
HARGA SATUAN PEKERJAAN
Page 14
NO KODE JENIS PEKERJAAN HARGA Rp.
13 A.5.1.1.27c. Pemasangan 1 bh Tee 1 ” 17,507.72
14 A.5.1.1.27d. Pemasangan 1 bh Gate Valve 1 inch 39,293.22
15 A.5.1.1.27e. Pemasangan 1 unit SUNSUN CEF-22000 WATER PUMP POMPA CELUP KOLAM IKAN KOI CEF 22000 L/h 2,114,530.00
16 A.5.1.1.28. Pemasangan 1 m’ Pipa PVC tipe AW Diameter 2 ” 48,324.71
17 A.5.1.1.31. Pemasangan 1 m’ Pipa PVC tipe AW Diameter 3” 87,644.33
18 A.5.1.1.31a. Pemasangan 1 bh Elbow 90° 3" AW 54,418.83
19 A.5.1.1.31b. Pemasangan 1 bh Tee 3" AW 59,918.83
20 A.5.1.1.31d. Pemasangan Socket 3" AW ex. Rucika Standar 45,924.39
21 A.5.1.1.31d. Pemasangan 1 bh Skimmer 4 - 3" AW 108,068.89
22 A.5.1.1.32. Pemasangan 1 m’ Pipa PVC tipe AW Diameter 4” 123,589.89
23 A.5.1.1.32a. Pemasangan 1 bh elbow 4" AW 62,209.89
24 A.5.1.1.32b. Pemasangan 1 bh Tee 4" AW 67,709.89
25 A.5.1.1.32c. Pemasangan 1 bh Socket 4" AW 80,909.89
26 A.5.1.1.32d. Pemasangan 1 bh Bottom Drain 4" AW 176,330.00
27 A.5.1.1.32e. Chember Mekanis 1 6,172,100.00
28 A.5.1.1.32e. Chember Mekanis 2 2,529,230.00
29 A.5.1.1.32e. Chember Biologis 2,166,686.50
30 A.5.1.1.32e. Chember Kimiawi 1,230,366.50
31 A.5.1.1.36 Pemasangan 1 buah Floor Drain 68,145.00
32 A.5.1.1.37. Pek. 1 m Saluran air hujan keliling bangunan 143,990.00
Page 15
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7500 85,000.00 63,750.00
Mandor L.04 OH 0.0250 110,000.00 2,750.00
B BAHAN
C PERALATAN
B BAHAN
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Mandor L.04 OH 0.0100 110,000.00 1,100.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2500 85,000.00 21,250.00
Mandor L.04 OH 0.0250 110,000.00 2,750.00
B BAHAN
Batu belah M3 1.2000 200,000.00 240,000.00
Semen portland Kg 202.0000 1,240.00 250,480.00
Pasir Pasang M3 0.4850 200,000.00 97,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.5000 85,000.00 127,500.00
Tukang batu L.02 OH 0.7500 95,000.00 71,250.00
Kepala tukang L.03 OH 0.0750 105,000.00 7,875.00
Mandor L.04 OH 0.0750 110,000.00 8,250.00
JUMLAH HARGA TENAGA KERJA 214,875.00
B BAHAN
Batu belah M3 1.2000 200,000.00 240,000.00
Semen portland Kg 163.0000 1,240.00 202,120.00
Pasir Pasang M3 0.5200 200,000.00 104,000.00
JUMLAH HARGA BAHAN 546,120.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang batu L.02 OH 0.2750 95,000.00 26,125.00
Kepala tukang L.03 OH 0.0280 105,000.00 2,940.00
Mandor L.04 OH 0.0830 110,000.00 9,130.00
B BAHAN
Semen Portland Kg 247.0000 1,240.00 306,280.00
Pasir Beton (1400 Kg/m3) m3 0.6379 250,000.00 159,475.00
Kerikil (1350 Kg/m3) m3 0.7607 330,000.00 251,031.00
Air Liter 215.0000 250.00 53,750.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang batu L.02 OH 0.2750 95,000.00 26,125.00
Kepala tukang L.03 OH 0.0280 105,000.00 2,940.00
Mandor L.04 OH 0.0830 110,000.00 9,130.00
B BAHAN
Semen Portland Kg 326.0000 1,240.00 404,240.00
Pasir Beton (1400 Kg/m3) m3 0.5429 250,000.00 135,725.00
Kerikil (1350 Kg/m3) m3 0.7622 330,000.00 251,526.00
Air Liter 215.0000 250.00 53,750.00
C PERALATAN
- -
- -
B BAHAN
Papan Kayu kelas III M3 0.0450 850,000.00 38,250.00
Paku 5 – 10 cm Kg 0.3000 20,000.00 6,000.00
Minyak bekisting Liter 0.1000 3,000.00 300.00
JUMLAH HARGA BAHAN 44,550.00
C PERALATAN
- -
- -
JUMLAH HARGA PERALATAN -
D Jumlah (A+B+C) 119,040.00
E Biaya Umum dan Keuntungan (Maksimum 15%) 10% xD 11,904.00
F Harga Satuan Pekerjaan (D+E) 130,944.00
A.4.1.1.20. Pemasangan 1 m2 Bekisting untuk Kolom Beton Bangunan Gedung
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6600 85,000.00 56,100.00
Tukang kayu L.02 OH 0.3300 95,000.00 31,350.00
Kepala tukang L.03 OH 0.0330 105,000.00 3,465.00
Mandor L.04 OH 0.0330 110,000.00 3,630.00
JUMLAH HARGA TENAGA KERJA 94,545.00
B BAHAN
Papan Kayu kelas III M3 0.0200 850,000.00 17,000.00
Paku 5 cm – 12 cm Kg 0.2000 18,000.00 3,600.00
Minyak bekisting Liter 0.1000 3,000.00 300.00
Balok kayu kelas II M3 0.0075 2,300,000.00 17,250.00
Multiplek 9mm Lbr 0.1750 90,000.00 15,750.00
Dolken kayu ø 8-10cm panjang 4 m Batang 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 73,900.00
C PERALATAN
- -
- -
JUMLAH HARGA PERALATAN -
B BAHAN
Papan Kayu kelas III M3 0.0400 850,000.00 34,000.00
Paku 5 cm – 12 cm Kg 0.4000 18,000.00 7,200.00
Minyak bekisting Liter 0.2000 3,000.00 600.00
Balok kayu kelas II M3 0.0180 2,300,000.00 41,400.00
Multiplek 9mm Lbr 0.3500 90,000.00 31,500.00
Dolken kayu ø 8-10cm panjang 4 m Batang 1.5000 20,000.00 30,000.00
JUMLAH HARGA BAHAN 144,700.00
C PERALATAN
- -
- -
JUMLAH HARGA PERALATAN -
D Jumlah (A+B+C) 239,245.00
E Biaya Umum dan Keuntungan (Maksimum 15%) 10% xD 23,924.50
F Harga Satuan Pekerjaan (D+E) 263,169.50
Pemasangan 1 m2 Bekisting untuk Balok Lintel Bangunan Gedung
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3300 85,000.00 28,050.00
Tukang kayu L.02 OH 0.1650 95,000.00 15,675.00
Kepala tukang L.03 OH 0.0165 105,000.00 1,732.50
Mandor L.04 OH 0.0165 110,000.00 1,815.00
JUMLAH HARGA TENAGA KERJA 47,272.50
B BAHAN
Papan Kayu kelas III M3 0.0024 850,000.00 2,040.00
Paku 5 cm – 12 cm Kg 0.4000 18,000.00 7,200.00
Minyak bekisting Liter 0.1200 3,000.00 360.00
Multiplek 9mm Lbr 0.1750 90,000.00 15,750.00
JUMLAH HARGA BAHAN 25,350.00
C PERALATAN
- -
- -
JUMLAH HARGA PERALATAN -
D Jumlah (A+B+C) 72,622.50
E Biaya Umum dan Keuntungan (Maksimum 15%) 10% xD 7,262.25
F Harga Satuan Pekerjaan (D+E) 79,884.75
Pemasangan 1 m2 Bekisting untuk Ring Balk Bangunan Gedung
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3300 85,000.00 28,050.00
Tukang kayu L.02 OH 0.1650 95,000.00 15,675.00
Kepala tukang L.03 OH 0.0165 105,000.00 1,732.50
Mandor L.04 OH 0.0165 110,000.00 1,815.00
JUMLAH HARGA TENAGA KERJA 47,272.50
B BAHAN
Papan Kayu kelas III M3 0.0200 850,000.00 17,000.00
Paku 5 cm – 12 cm Kg 0.2000 18,000.00 3,600.00
Minyak bekisting Liter 0.1000 3,000.00 300.00
Multiplek 9mm Lbr 0.0875 90,000.00 7,875.00
JUMLAH HARGA BAHAN 28,775.00
C PERALATAN
- -
- -
JUMLAH HARGA PERALATAN -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6600 85,000.00 56,100.00
Tukang kayu L.02 OH 0.3300 95,000.00 31,350.00
Kepala tukang L.03 OH 0.0330 105,000.00 3,465.00
Mandor L.04 OH 0.0330 110,000.00 3,630.00
JUMLAH HARGA TENAGA KERJA 94,545.00
B BAHAN
Papan Kayu kelas III M3 0.0150 850,000.00 12,750.00
Paku 5 cm – 12 cm Kg 0.2000 18,000.00 3,600.00
Minyak bekisting Liter 0.1000 3,000.00 300.00
Balok kayu kelas II m3 0.0100 2,300,000.00 23,000.00
Multiplek 9 mm Lbr 0.1750 90,000.00 15,750.00
Dolken kayu Ø 8-10/400 cm Batang 1.1000 20,000.00 22,000.00
B BAHAN
Besi beton (polos/ulir) Kg 10.5000 10,650.00 111,825.00
Kawat beton Kg 0.1500 20,000.00 3,000.00
C PERALATAN
- -
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0250 85,000.00 2,125.00
Tukang Besi L.02 OH 0.0250 95,000.00 2,375.00
Kepala tukang L.03 OH 0.0250 105,000.00 2,625.00
Mandor L.04 OH 0.0010 110,000.00 110.00
B BAHAN
Jaring kawat baja dilas Kg 10.2000 10,000.00 102,000.00
Kawat beton Kg 0.0500 20,000.00 1,000.00
C PERALATAN
- -
- -
A.4.4.1.1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP.
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.6000 85,000.00 51,000.00
Tukang batu L.02 OH 0.2000 95,000.00 19,000.00
Kepala tukang L.03 OH 0.0200 105,000.00 2,100.00
Mandor L.04 OH 0.0300 110,000.00 3,300.00
B BAHAN
Bata merah Buah 140.0000 700.00 98,000.00
Semen Portland Kg 22.2000 1,240.00 27,528.00
Pasir pasang M3 0.1020 200,000.00 20,400.00
C PERALATAN
- -
A.4.4.1.8 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal ½ Batu dengan Mortar tipe S, fc’ 12, 5 Mpa ( Setara Campuran 1SP : 3PP).
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang batu L.02 OH 0.1000 95,000.00 9,500.00
Kepala tukang L.03 OH 0.0100 105,000.00 1,050.00
Mandor L.04 OH 0.0150 110,000.00 1,650.00
B BAHAN
Bata merah Buah 70.0000 700.00 49,000.00
Semen Portland Kg 14.3700 1,240.00 17,818.80
Pasir pasang M3 0.0400 200,000.00 8,000.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang batu L.02 OH 0.1000 95,000.00 9,500.00
Kepala tukang L.03 OH 0.0100 105,000.00 1,050.00
Mandor L.04 OH 0.0150 110,000.00 1,650.00
JUMLAH HARGA TENAGA KERJA 37,700.00
B BAHAN
Bata merah Buah 70.0000 700.00 49,000.00
Semen Portland Kg 9.6800 1,240.00 12,003.20
Pasir pasang M3 0.0450 200,000.00 9,000.00
JUMLAH HARGA BAHAN 70,003.20
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 85,000.00 12,750.00
Tukang batu L.02 OH 0.0750 95,000.00 7,125.00
Kepala tukang L.03 OH 0.0080 105,000.00 840.00
Mandor L.04 OH 0.0080 110,000.00 880.00
B BAHAN
Semen Portlan Kg 5.1840 1,240.00 6,428.16
Pasir Pasang M3 0.0260 200,000.00 5,200.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang batu L.02 OH 0.1500 95,000.00 14,250.00
Kepala tukang L.03 OH 0.0150 105,000.00 1,575.00
Mandor L.04 OH 0.0150 110,000.00 1,650.00
B BAHAN
Semen Portlan Kg 7.7760 1,240.00 9,642.24
Pasir Pasang M3 0.0230 200,000.00 4,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang batu L.02 OH 0.1000 95,000.00 9,500.00
Kepala tukang L.03 OH 0.0100 105,000.00 1,050.00
Mandor L.04 OH 0.0100 110,000.00 1,100.00
JUMLAH HARGA TENAGA KERJA 28,650.00
B BAHAN
Semen Portlan Kg 3.2500 1,240.00 4,030.00
JUMLAH HARGA BAHAN 4,030.00
C PERALATAN
A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 25cm x 25cm Warna Kasar
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 85,000.00 59,500.00
Tukang batu L.02 OH 0.3500 95,000.00 33,250.00
Kepala tukang L.03 OH 0.0350 105,000.00 3,675.00
Mandor L.04 OH 0.0350 110,000.00 3,850.00
B BAHAN
Keramik ukuran 25cm x 25cm Bh 26.5000 2,800.00 74,200.00
Semen portland Kg 10.4000 1,240.00 12,896.00
Pasir Pasang M3 0.0450 200,000.00 9,000.00
Semen Warna Kg 1.6200 19,500.00 31,590.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2500 85,000.00 21,250.00
Tukang batu L.02 OH 0.1250 95,000.00 11,875.00
Kepala tukang L.03 OH 0.0130 105,000.00 1,365.00
Mandor L.04 OH 0.0130 110,000.00 1,430.00
B BAHAN
keramik warna ukuran 40cm x40 cm Bh 6.6300 11,000.00 72,930.00
Semen portland Kg 9.8000 1,240.00 12,152.00
Semen Warna M3 1.3000 19,500.00 25,350.00
Pasir Pasang Kg 0.0450 200,000.00 9,000.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.9000 85,000.00 76,500.00
Tukang batu L.02 OH 0.4500 95,000.00 42,750.00
Kepala tukang L.03 OH 0.0450 105,000.00 4,725.00
Mandor L.04 OH 0.0450 110,000.00 4,950.00
B BAHAN
Keramik lantai 25x40, Sek Roman Bh 21.0000 3,000.00 63,000.00
Semen Portland Kg 9.3000 1,240.00 11,532.00
Pasir pasang M3 0.0180 200,000.00 3,600.00
Semen Warna Kg 1.9400 19,500.00 37,830.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.7000 85,000.00 59,500.00
Tukang batu L.02 OH 0.3500 95,000.00 33,250.00
Kepala tukang L.03 OH 0.0350 105,000.00 3,675.00
Mandor L.04 OH 0.0350 110,000.00 3,850.00
JUMLAH HARGA TENAGA KERJA 100,275.00
B BAHAN
papan kayu kls 1 raksamala m3 0.0330 4,500,000.00 148,500.00
JUMLAH HARGA BAHAN 148,500.00
C PERALATAN
- -
B BAHAN
Soda api ltr 0.0500 25,000.00 1,250.00
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
B BAHAN
Plamuur Kg 0.1000 16,000.00 1,600.00
Cat dasar Tembok Kg 0.1000 30,000.00 3,000.00
Cat Penutup Tembok Kg 0.2600 30,000.00 7,800.00
JUMLAH HARGA BAHAN 12,400.00
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
D Jumlah (A+B+C) 21,076.50
E Biaya Umum dan Keuntungan (Maksimum 15%) 10% xD 2,107.65
F Harga Satuan Pekerjaan (D+E) 23,184.15
Pengecatan 1 m2 tembok lama
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0200 85,000.00 1,700.00
Tukang cat L.02 OH 0.0630 95,000.00 5,985.00
Kepala tukang L.03 OH 0.0063 105,000.00 661.50
Mandor L.04 OH 0.0030 110,000.00 330.00
JUMLAH HARGA TENAGA KERJA 8,676.50
B BAHAN
Cat Penutup Tembok Kg 0.2600 30,000.00 7,800.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0700 85,000.00 5,950.00
Tukang cat L.02 OH 0.0090 95,000.00 855.00
Kepala tukang L.03 OH 0.0060 105,000.00 630.00
Mandor L.04 OH 0.0030 110,000.00 330.00
JUMLAH HARGA TENAGA KERJA 7,765.00
B BAHAN
Cat menie Kg 0.2000 50,000.00 10,000.00
Plamuur Kg 0.1500 50,000.00 7,500.00
Cat dasar Kayu Kg 0.1700 75,000.00 12,750.00
Cat Penutup Kayu Kg 0.2600 75,000.00 19,500.00
Kuas Bh 0.0100 15,000.00 150.00
Pengencer Kg 0.0300 15,000.00 450.00
Ampelas Lbr 0.2000 5,000.00 1,000.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0700 85,000.00 5,950.00
Tukang cat L.02 OH 0.0090 95,000.00 855.00
Kepala tukang L.03 OH 0.0060 105,000.00 630.00
Mandor L.04 OH 0.0030 110,000.00 330.00
JUMLAH HARGA TENAGA KERJA 7,765.00
B BAHAN
Cat menie Kg 0.2000 50,000.00 10,000.00
Cat Penutup Kayu Kg 0.2600 75,000.00 19,500.00
Kuas Bh 0.0100 15,000.00 150.00
Pengencer Kg 0.0300 15,000.00 450.00
JUMLAH HARGA BAHAN 30,100.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0200 85,000.00 1,700.00
Tukang cat L.02 OH 0.0630 95,000.00 5,985.00
Kepala tukang L.03 OH 0.0063 105,000.00 661.50
Mandor L.04 OH 0.0030 110,000.00 330.00
JUMLAH HARGA TENAGA KERJA 8,676.50
B BAHAN
Cat dasar Tembok Kg 0.1000 56,000.00 5,600.00
Cat Penutup Tembok Kg 0.2600 56,000.00 14,560.00
JUMLAH HARGA BAHAN 20,160.00
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
D Jumlah (A+B+C) 28,836.50
E Biaya Umum dan Keuntungan (Maksimum 15%) 10% xD 2,883.65
F Harga Satuan Pekerjaan (D+E) 31,720.15
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0180 85,000.00 1,530.00
Tukang batu L.02 OH 0.0300 95,000.00 2,850.00
Kepala tukang L.03 OH 0.0030 105,000.00 315.00
Mandor L.04 OH 0.0010 110,000.00 110.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0180 85,000.00 1,530.00
Tukang batu L.02 OH 0.0300 95,000.00 2,850.00
Kepala tukang L.03 OH 0.0030 105,000.00 315.00
Mandor L.04 OH 0.0010 110,000.00 110.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 105,000.00 630.00
Mandor L.04 OH 0.0020 110,000.00 220.00
JUMLAH HARGA TENAGA KERJA 9,610.00
B BAHAN
Pipa PVC 1 ” M¹ 1.2000 17,000.00 20,400.00
Lem Pipa PVC g 8.0000 138.89 1,111.11
JUMLAH HARGA BAHAN 21,511.11
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 105,000.00 630.00
Mandor L.04 OH 0.0020 110,000.00 220.00
JUMLAH HARGA TENAGA KERJA 9,610.00
B BAHAN
Pipa Galvanis 1 ” M¹ 1.0500 60,000.00 63,000.00
Sealtape ls 0.2500 5,000.00 1,250.00
JUMLAH HARGA BAHAN 64,250.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0180 85,000.00 1,530.00
Tukang batu L.02 OH 0.0300 95,000.00 2,850.00
Kepala tukang L.03 OH 0.0030 105,000.00 315.00
Mandor L.04 OH 0.0010 110,000.00 110.00
JUMLAH HARGA TENAGA KERJA 4,805.00
B BAHAN
Elbow 1 ” bh 1.0000 8,000.00 8,000.00
Lem Pipa PVC g 8.0000 138.89 1,111.11
JUMLAH HARGA BAHAN 9,111.11
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0180 85,000.00 1,530.00
Tukang batu L.02 OH 0.0300 95,000.00 2,850.00
Kepala tukang L.03 OH 0.0030 105,000.00 315.00
Mandor L.04 OH 0.0010 110,000.00 110.00
JUMLAH HARGA TENAGA KERJA 4,805.00
B BAHAN
Tee 1 ” bh 1.0000 10,000.00 10,000.00
Lem Pipa PVC g 8.0000 138.89 1,111.11
JUMLAH HARGA BAHAN 11,111.11
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1000 85,000.00 8,500.00
Tukang batu L.02 OH 0.1000 95,000.00 9,500.00
Kepala tukang L.03 OH 0.0200 105,000.00 2,100.00
Mandor L.04 OH 0.0200 110,000.00 2,200.00
JUMLAH HARGA TENAGA KERJA 22,300.00
B BAHAN
SUNSUN CEF-22000 WATER PUMP POMPA
unit 1.0000 1,875,000.00 1,875,000.00
CELUP KOLAM IKAN KOI CEF 22000 L/h
bahan/alat pelengkap ls 1.0000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 1,900,000.00
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
D Jumlah (A+B+C) 1,922,300.00
E Biaya Umum dan Keuntungan (Maksimum 15%) 10% xD 192,230.00
F Harga Satuan Pekerjaan (D+E) 2,114,530.00
A.5.1.1.28. Pemasangan 1 m’ Pipa PVC tipe AW Diameter 2 ”
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 105,000.00 630.00
Mandor L.04 OH 0.0020 110,000.00 220.00
JUMLAH HARGA TENAGA KERJA 9,610.00
B BAHAN
Pipa PVC 2 ” M¹ 1.2000 24,000.00 28,800.00
Lem Pipa PVC g 11.0000 138.89 1,527.78
JUMLAH HARGA BAHAN 30,327.78
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 105,000.00 630.00
Mandor L.04 OH 0.0020 110,000.00 220.00
JUMLAH HARGA TENAGA KERJA 9,610.00
B BAHAN
Pipa PVC 3” M¹ 1.2000 57,000.00 68,400.00
Lem Pipa PVC g 12.0000 138.89 1,666.67
JUMLAH HARGA BAHAN 70,066.67
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0180 85,000.00 1,530.00
Tukang batu L.02 OH 0.0300 95,000.00 2,850.00
Kepala tukang L.03 OH 0.0030 105,000.00 315.00
Mandor L.04 OH 0.0010 110,000.00 110.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0180 85,000.00 1,530.00
Tukang batu L.02 OH 0.0300 95,000.00 2,850.00
Kepala tukang L.03 OH 0.0030 105,000.00 315.00
Mandor L.04 OH 0.0010 110,000.00 110.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0015 105,000.00 157.50
Mandor L.04 OH 0.0010 110,000.00 110.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0015 105,000.00 157.50
Mandor L.04 OH 0.0010 110,000.00 110.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0015 105,000.00 157.50
Mandor L.04 OH 0.0010 110,000.00 110.00
JUMLAH HARGA TENAGA KERJA 9,027.50
B BAHAN
Tee 4" AW bh 1.0000 100,000.00 100,000.00
Lem Pipa PVC g 14.0000 138.89 1,944.44
JUMLAH HARGA BAHAN 101,944.44
C PERALATAN
- -
JUMLAH HARGA PERALATAN -
D Jumlah (A+B+C) 110,971.94
E Biaya Umum dan Keuntungan (Maksimum 15%) 10% xD 11,097.19
F Harga Satuan Pekerjaan (D+E) 122,069.14
A.5.1.1.31f. Pemasangan 1 bh socket 4" AW
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0015 105,000.00 157.50
Mandor L.04 OH 0.0010 110,000.00 110.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0180 85,000.00 1,530.00
Tukang batu L.02 OH 0.0300 95,000.00 2,850.00
Kepala tukang L.03 OH 0.0030 105,000.00 315.00
Mandor L.04 OH 0.0010 110,000.00 110.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang batu L.02 OH 0.2000 95,000.00 19,000.00
Kepala tukang L.03 OH 0.0200 105,000.00 2,100.00
Mandor L.04 OH 0.0200 110,000.00 2,200.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 105,000.00 630.00
Mandor L.04 OH 0.0020 110,000.00 220.00
JUMLAH HARGA TENAGA KERJA 9,610.00
B BAHAN
Pipa PVC 4” M¹ 1.2000 84,000.00 100,800.00
Lem Pipa PVC g 14.0000 138.89 1,944.44
JUMLAH HARGA BAHAN 102,744.44
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 105,000.00 630.00
Mandor L.04 OH 0.0020 110,000.00 220.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 105,000.00 630.00
Mandor L.04 OH 0.0020 110,000.00 220.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0360 85,000.00 3,060.00
Tukang batu L.02 OH 0.0600 95,000.00 5,700.00
Kepala tukang L.03 OH 0.0060 105,000.00 630.00
Mandor L.04 OH 0.0020 110,000.00 220.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang batu L.02 OH 0.2000 95,000.00 19,000.00
Kepala tukang L.03 OH 0.0200 105,000.00 2,100.00
Mandor L.04 OH 0.0200 110,000.00 2,200.00
Harga Jumlah
No Uraian Bahan dan Upah Pasang Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN DAN UPAH
Tatakan Alas Dasar Chamber Media Filter Kolam Koi m2 0.7980 360,000.00 287,280.00
Harga Jumlah
No Uraian Bahan dan Upah Pasang Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN DAN UPAH
Tatakan Alas Dasar Chamber Media Filter Kolam Koi m2 0.7980 360,000.00 287,280.00
Tatakan Alas Dasar Chamber Media Filter Kolam Koi m2 0.798 360,000.00 287,280.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.2000 85,000.00 17,000.00
Tukang batu L.02 OH 0.2000 95,000.00 19,000.00
Kepala tukang L.03 OH 0.0200 105,000.00 2,100.00
Mandor L.04 OH 0.0200 110,000.00 2,200.00
B BAHAN
Bata Merah Buah 30.0000 700.00 21,000.00
Semen Portlan Kg 40.0000 1,240.00 49,600.00
Pasir Pasang M3 0.1000 200,000.00 20,000.00
C PERALATAN
- -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 85,000.00 12,750.00
Tukang batu L.02 OH 0.1500 95,000.00 14,250.00
Kepala tukang L.03 OH 0.0300 105,000.00 3,150.00
Mandor L.04 OH 0.0300 110,000.00 3,300.00
B BAHAN
Kabel NYM 3x2,5 mm2 M' 4.0000 8,440.00 33,760.00
Pipa Conduit M' 4.0000 3,000.00 12,000.00
Socket Pipa bh 1.0000 1,200.00 1,200.00
Tee Doos bh 2.0000 3,500.00 7,000.00
Klem Pipa bh 3.0000 500.00 1,500.00
Fhiser bh 6.0000 1,200.00 7,200.00
Las Dop bh 2.0000 2,500.00 5,000.00
Sealtape Listrik bh 0.2500 5,000.00 1,250.00
C PERALATAN
Page 51