JUMLAH
No. URAIAN PEKERJAAN HARGA
(Rp)
1 2 3
A. TOTAL 214,279,994.93
B. JUMLAH BANGUNAN 2 UNIT 536,056,921.56
C. PAJAK PERTAMBAHAN NILAI ( 11 % ) 58,966,261.37
D. JUMLAH TOTAL BIAYA PEKERJAAN 595,023,182.93
E. FAKTOR PEMBULATAN 595,000,000.00
HARGA JUMLAH
No. URAIAN PEKERJAAN SAT VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
A PEKERJAAN TAMBAHAN
1 Mobilisasi Alat Ls 1.00 101,250,000.00 101,250,000.00
2 Pematangan Lokasi 1 (Kampung susumuk) M³ 88.8 70,348.33 6,246,931.70
107,496,931.70
I PEKERJAAN PERSIAPAN
3 Pembersian Awal M² 72.00 94,000.00 6,768,000.00
4 Pemasangan Bowplank M 22.00 154,790.00 3,405,380.00
5 Foto Dokumentasi + Laporan Ls 1.00 7,000,000.00 7,000,000.00
6 Papan Nama Proyek Ls 1.00 1,500,000.00 1,500,000.00
Jumlah 18,673,380.00
II PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah M³ 12.30 94,000.00 1,155,805.20
2 Pasangan Pondasi Batu gunung M³ 7.48 7,183,886.36 53,735,470.00
3 Pasangan Batu Kosong M³ 1.92 3,428,850.00 6,600,536.25
4 Urugan Pasir Bawah Pondasi M³ 1.85 1,623,500.00 3,007,371.40
5 Urugan Pasir Bawah Lantai M³ 1.18 1,623,500.00 1,911,314.08
6 Urugan Tanah Kembali M³ 4.62 45,050.00 208,131.00
7 Urugan Tanah Dan Pemadatan M³ 4.71 1,227,500.00 5,780,444.80
Jumlah 72,399,072.73
III PEKERJAAN KAYU
1 Kolom Kayu besi 10/10 M³ 0.30 12,082,400.00 3,624,720.00
2 Pekerjaan Ring Balok Kayu Besi 10/10 M³ 0.22 12,082,400.00 2,658,128.00
3 Kuda-kuda kayu besi 5/10 M³ 0.69 12,082,400.00 8,336,856.00
4 Pekerjaan Gording kayu besi 5/10 M³ 0.88 12,082,400.00 10,632,512.00
5 Pekerjaan kusen kayu besi 5/10 M³ 0.15 14,705,000.00 2,205,750.00
6 Pekerjaan daun jendela kaca M² 1.00 1,203,500.00 1,203,500.00
7 Pekerjaan Daun pintu M² 1.42 1,210,000.00 1,714,449.00
Jumlah 30,375,915.00
IV PEKERJAAN PASANGAN DINDING DAN LANTAI
1 Pas. Batu Tela Dinding 1 pc : 4 ps M³ 5.83 2,413,127.27 14,068,532.00
2 Plesteran Dinding,t.15 mm M² 77.90 247,018.18 19,242,716.36
3 Pek. Acian Dinding M² 77.90 130,590.91 10,173,031.82
4 Pek Lantai Beton Tumbuk M³ 1.82 379,431.82 691,597.96
5 Pek Pasangan Tegel 30/30 M² 11.52 558,509.09 6,434,024.73
6 Pek Pasangan Tegel 10/10 M² 1.38 558,509.09 770,742.55
Jumlah 51,380,645.42
V PEKERJAAN ATAP DAN PLAFON
1 Atap Seng Gelombang M² 25.77 99,400.00 2,561,975.36
2 Rangka Plafon + tripleks 3mm M² 13.89 894,085.00 12,415,353.72
3 Pemasangan lisplank M 21.48 249,135.00 5,351,419.80
Jumlah 20,328,748.88
VI PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Kunci Pintu Bh 3.00 456,050.00 1,368,150.00
2 Engsel Pintu 4" - Stainles Steel Bh 3.00 65,262.50 195,787.50
3 Engsel Jendela Bh 3.00 45,175.00 135,525.00
4 Grendel Jendela / Ventilasi Bh 3.00 83,500.00 250,500.00
5 Hak Angin Jendela Bh 3.00 65,262.50 195,787.50
Jumlah 2,145,750.00
VII PEKERJAAN PENGECATAN
1 Cat Dinding M² 77.90 160,515.00 12,504,118.50
2 Cat Kayu Kusen M² 5.20 57,850.00 300,820.00
3 Cat Kayu Lisplank M² 8.59 50,815.00 436,602.48
4 Cat Plafon M² 13.89 45,725.00 634,941.92
Jumlah 13,876,482.90
VIII PEKERJAAN AKHIR
1 Pembersihan Akhir Ls 1.00 5,100,000.00 5,100,000.00
Jumlah 5,100,000.00
A. TOTAL 214,279,994.93
ANALISA HARGA SATUAN UPAH DAN BAHAN
I. PEKERJAAN PERSIAPAN
1. An. SNI 2002, 1 M² Pembersihan Lokasi
Upah :
0.40 Oh Pekerja @Rp. 200,000.00 = Rp. 80,000.00
0.04 Oh Mandor @Rp. 350,000.00 = Rp. 14,000.00
Jumlah Rp. 94,000.00
Upah :
0.05 Oh Pekerja @Rp. 200,000.00 = Rp. 10,000.00
0.05 Oh Mandor @Rp. 350,000.00 = Rp. 17,500.00
27,500.00
Bahan :
1.20 M3 Tanah Timbunan @Rp. 1,000,000.00 = Rp. 1,200,000.00
Jumlah Rp. 1,227,500.00
4. An. SNI 2002, 1 M3 Urugan Pasir di Bawah Pondasi dan Lantai
Upah :
0.30 Oh Pekerja @Rp. 200,000.00 = Rp. 60,000.00
0.01 Oh Mandor @Rp. 350,000.00 = Rp. 3,500.00
63,500.00
Bahan :
1.20 M3 Pasir Urug @Rp. 1,300,000.00 = Rp. 1,560,000.00
Jumlah Rp. 1,623,500.00
III. PEKERJAAN PASANGAN DAN BETON
1. An. SNI 2002, 1M3 Pasang Batu Kosong / Aanstamping
Upah :
0.39 Oh Tukang Batu @Rp. 250,000.00 = Rp. 97,500.00
0.04 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 11,700.00
0.78 Oh Pekerja @Rp. 200,000.00 = Rp. 156,000.00
0.04 Oh Mandor @Rp. 350,000.00 = Rp. 13,650.00
278,850.00
Bahan :
0.30 M3 Pasir Urug @Rp. 1,300,000.00 = Rp. 390,000.00
1.20 M3 Batu Gunung @Rp. 2,300,000.00 = Rp. 2,760,000.00
Jumlah Rp. 3,428,850.00
2. An. SNI 2002, 1 M Pasang Pondasi Batu Gunung 1 : 4
3
Upah :
0.60 Oh Tukang Batu @Rp. 250,000.00 = Rp. 150,000.00
0.06 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 18,000.00
1.50 Oh Pekerja @Rp. 200,000.00 = Rp. 300,000.00
0.08 Oh Mandor @Rp. 350,000.00 = Rp. 26,250.00
494,250.00
Bahan :
1.10 M3 Batu Gunung @Rp. 2,300,000.00 = Rp. 2,530,000.00
163.00 Kg Semen Portland @Rp. 18,181.82 = Rp. 2,963,636.36
0.52 M3 Pasir Pasang @Rp. 2,300,000.00 = Rp. 1,196,000.00
Jumlah Rp. 7,183,886.36
3. An. SNI 2002, 1 M2 Pasangan 1 Batu Bata Merah 1 : 4
Upah :
0.20 Oh Tukang Batu @Rp. 250,000.00 = Rp. 50,000.00
0.02 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 6,000.00
0.65 Oh Pekerja @Rp. 200,000.00 = Rp. 130,000.00
0.03 Oh Mandor @Rp. 350,000.00 = Rp. 10,500.00
196,500.00
Bahan :
152.00 Bh Batu Bata Merah @Rp. 10,000.00 = Rp. 1,520,000.00
26.55 Kg Semen Portland @Rp. 18,181.82 = Rp. 482,727.27
0.09 M3 Pasir Pasang @Rp. 2,300,000.00 = Rp. 213,900.00
Jumlah Rp. 2,413,127.27
5. An. SNI 2002, 1M Beton Tumbuk 1 : 3 : 5
3
Upah :
0.25 Oh Tukang Batu @Rp. 250,000.00 = Rp. 62,500.00
0.03 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 7,500.00
1.65 Oh Pekerja @Rp. 200,000.00 = Rp. 330,000.00
0.08 Oh Mandor @Rp. 350,000.00 = Rp. 28,000.00
428,000.00
Bahan :
218.00 Kg Semen Portland @Rp. 18,181.82 = Rp. 3,963,636.36
0.87 M3 Batu Kerikil @Rp. 2,300,000.00 = Rp. 2,001,000.00
0.52 M3 Pasir Beton @Rp. 2,300,000.00 = Rp. 1,196,000.00
Jumlah Rp. 7,588,636.36
0.05 Untuk 1 m 2
Tebal 5 cm @Rp. 7,588,636.36 Rp. 379,431.82
IV. PEKERJAAN LANTAI DAN PLESTERAN
1. An. SNI 2002, 1M2 Pasang Lantai Keramik
Upah :
0.35 Oh Tukang Batu @Rp. 250,000.00 = Rp. 87,500.00
0.04 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 10,500.00
0.62 Oh Pekerja @Rp. 200,000.00 = Rp. 124,000.00
0.03 Oh Mandor @Rp. 350,000.00 = Rp. 10,500.00
Rp. 232,500.00
Bahan :
11.38 Kg Semen Portland @Rp. 18,181.82 = Rp. 206,909.09
0.04 M3 Pasir Pasang @Rp. 2,300,000.00 = Rp. 96,600.00
1.50 Kg Semen Warna @Rp. 15,000.00 = Rp. 22,500.00
Jumlah Rp. 558,509.09
5. An. SNI 2002, 1M2 Plesteran ad. 1 : 3 tebal 15 mm
Upah :
0.15 Oh Tukang Batu @Rp. 250,000.00 = Rp. 37,500.00
0.02 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 4,500.00
0.20 Oh Pekerja @Rp. 200,000.00 = Rp. 40,000.00
0.01 Oh Mandor @Rp. 350,000.00 = Rp. 3,500.00
Rp. 85,500.00
Bahan :
0.02 M3 Pasir Plester @Rp. 2,300,000.00 = Rp. 43,700.00
6.48 Kg Semen Portland @Rp. 18,181.82 = Rp. 117,818.18
Jumlah Rp. 247,018.18
7. An. SNI 2002, 1M Pekerjaan Acian Dinding
2
Upah :
0.10 Oh Tukang Batu @Rp. 250,000.00 = Rp. 25,000.00
0.01 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 3,000.00
0.20 Oh Pekerja @Rp. 200,000.00 = Rp. 40,000.00
0.01 Oh Mandor @Rp. 350,000.00 = Rp. 3,500.00
Rp. 71,500.00
Bahan :
3.25 Kg Semen Portland @Rp. 18,181.82 = Rp. 59,090.91
Jumlah Rp. 130,590.91
V. PEKERJAAN KAYU, PLAFOND DAN ATAP
1. An. SNI 2002, 1M3 Pasang Kusen Pintu, Dan Jendela Kayu
Upah :
20.00 Oh Tukang Kayu @Rp. 250,000.00 = Rp. 5,000,000.00
2.00 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 600,000.00
6.00 Oh Pekerja @Rp. 200,000.00 = Rp. 1,200,000.00
0.30 Oh Mandor @Rp. 350,000.00 = Rp. 105,000.00
Rp. 6,905,000.00
Bahan :
1.20 M3 Balok Kayu 6/12 Klas I @Rp. 6,500,000.00 = Rp. 7,800,000.00
Jumlah Rp. 14,705,000.00
2. An. SNI 2002, 1M2 Pasang Pintu Panil Kayu
Upah :
2.50 Oh Tukang Kayu @Rp. 250,000.00 = Rp. 625,000.00
0.25 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 75,000.00
1.00 Oh Pekerja @Rp. 200,000.00 = Rp. 200,000.00
0.05 Oh Mandor @Rp. 350,000.00 = Rp. 17,500.00
Rp. 917,500.00
Bahan :
0.05 M3 Papan Klas I @Rp. 6,500,000.00 = Rp. 292,500.00
Jumlah Rp. 1,210,000.00
3. An. SNI 2002, 1M2 Pasang Jendela/Ventilasi Bingkai Kayu Kaca Tebal 5 mm
Upah :
2.00 Oh Tukang Kayu @Rp. 250,000.00 = Rp. 500,000.00
0.20 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 60,000.00
0.80 Oh Pekerja @Rp. 200,000.00 = Rp. 160,000.00
0.04 Oh Mandor @Rp. 350,000.00 = Rp. 14,000.00
Rp. 734,000.00
Bahan :
0.04 M3 Papan Klas I @Rp. 6,500,000.00 = Rp. 227,500.00
1.10 M2 Kaca Ryben 5 mm @Rp. 220,000.00 = Rp. 242,000.00
Jumlah 1,203,500.00
6. An. SNI 2002, 1M³ Pasang Konstruksi Kuda-kuda Kayu + Gording
Upah :
12.00 Oh Tukang Kayu @Rp. 250,000.00 = Rp. 3,000,000.00
1.20 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 360,000.00
4.00 Oh Pekerja @Rp. 200,000.00 = Rp. 800,000.00
0.20 Oh Mandor @Rp. 350,000.00 = Rp. 70,000.00
Rp. 4,230,000.00
Bahan :
1.20 M3 Kayu Klas I @Rp. 6,500,000.00 = Rp. 7,800,000.00
1.10 Btg Besi Strip @Rp. 28,000.00 = Rp. 30,800.00
0.80 Kg Paku Biasa @Rp. 27,000.00 = Rp. 21,600.00
Jumlah Rp. 12,082,400.00
8. An. SNI 2002, 1M2 Pasang Plafond + Rangka Plafond Tripleks 4 mm
Upah :
0.40 Oh Tukang Kayu @Rp. 250,000.00 = Rp. 100,000.00
0.04 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 12,000.00
0.27 Oh Pekerja @Rp. 200,000.00 = Rp. 54,000.00
0.01 Oh Mandor @Rp. 350,000.00 = Rp. 4,725.00
Rp. 170,725.00
Bahan :
0.38 Lbr Tripleks 4 mm @Rp. 160,000.00 =Rp. 60,000.00
0.12 M3 Kayu Klas II @Rp. 5,500,000.00 =Rp. 660,000.00
0.10 Kg Paku Biasa @Rp. 27,000.00 =Rp. 2,700.00
0.03 Kg Paku Tripleks @Rp. 22,000.00 =Rp. 660.00
Jumlah Rp. 894,085.00
12. An. SNI 2002, 1M2 Pasang Listplank Papan
Upah :
0.22 Oh Tukang Kayu @Rp. 250,000.00 = Rp. 55,000.00
0.02 Oh Kepala Tukang @Rp. 300,000.00 = Rp. 6,600.00
0.11 Oh Pekerja @Rp. 200,000.00 = Rp. 22,000.00
0.01 Oh Mandor @Rp. 350,000.00 = Rp. 1,750.00
Rp. 85,350.00
Bahan :
0.02 M3 Papan Klas I @Rp. 6,500,000.00 = Rp. 162,435.00
0.05 Kg Paku Biasa @Rp. 27,000.00 = Rp. 1,350.00
Jumlah Rp. 249,135.00
2. An. SNI 2002, 1M Pengecatan Bidang Kayu Baru, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
2
Upah :
0.01 Tukang Cat @Rp. 250,000.00 = Rp. 2,250.00
0.01 Kepala Tukang @Rp. 300,000.00 = Rp. 1,800.00
0.07 Pekerja @Rp. 200,000.00 = Rp. 14,000.00
0.00 Mandor @Rp. 350,000.00 = Rp. 875.00
Rp. 18,925.00
Bahan :
0.20 Kg Cat Meni Dasar @Rp. 35,000.00 =Rp. 7,000.00
0.15 Kg Plamur Kayu @Rp. 30,000.00 =Rp. 4,500.00
0.26 Kg Cat Kayu (2x) @Rp. 55,000.00 =Rp. 14,300.00
0.10 Bh Kuas Biasa @Rp. 10,000.00 =Rp. 1,000.00
Jumlah Rp. 45,725.00
3. An. SNI 2002, 1M2 Pengecatan Tembok Baru, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Upah :
0.06 Tukang Cat @Rp. 250,000.00 = Rp. 15,750.00
0.01 Kepala Tukang @Rp. 300,000.00 = Rp. 1,890.00
0.02 Pekerja @Rp. 200,000.00 = Rp. 4,000.00
0.00 Mandor @Rp. 350,000.00 = Rp. 875.00
Rp. 22,515.00
Bahan :
0.10 Kg Cat Dasar @Rp. 55,000.00 = Rp. 5,500.00
0.26 Kg Cat Tembok (2x) ex. Harmoni Warna @Rp. 1,200,000.00 = Rp. 312,000.00
0.10 Bh Kuas Roll @Rp. 25,000.00 = Rp. 2,500.00
Jumlah Rp. 342,515.00
Upah :
0.06 Tukang Cat @Rp. 250,000.00 = Rp. 15,750.00
0.01 Kepala Tukang @Rp. 300,000.00 = Rp. 1,890.00
0.02 Pekerja @Rp. 200,000.00 = Rp. 4,000.00
0.00 Mandor @Rp. 350,000.00 = Rp. 875.00
Rp. 22,515.00
Bahan :
0.26 Kg Aqua Proof @Rp. 105,000.00 = Rp. 27,300.00
0.10 Bh Kuas Biasa @Rp. 10,000.00 = Rp. 1,000.00
Jumlah Rp. 50,815.00
5. An. SNI 2002, 1M Pengecatan Plafond + List Profil Gypsum Board dengan Cat Tembok
2
Upah :
0.06 Tukang Cat @Rp. 250,000.00 = Rp. 15,750.00
0.01 Kepala Tukang @Rp. 300,000.00 = Rp. 1,800.00
0.02 Pekerja @Rp. 200,000.00 = Rp. 4,000.00
0.00 Mandor @Rp. 350,000.00 = Rp. 1,050.00
Rp. 22,600.00
Bahan :
0.10 Kg Cat Dasar @Rp. 55,000.00 = Rp. 5,500.00
0.05 Kg Cat Tembok (2x) ex. Harmoni Putih Bersih @Rp. 500,000.00 = Rp. 25,000.00
0.15 Kg Compone (Dempul) @Rp. 30,000.00 = Rp. 4,500.00
0.01 Roll Perban @Rp. 25,000.00 = Rp. 250.00
Jumlah Rp. 57,850.00
VII. PEKERJAAN PENGGANTUNG DAN PENGUNCI
1. An. SNI 2002, 1 Set Pasang Kunci Tanam Stainless Steel 2x Putar
Upah :
0.60 Tukang Kayu @Rp. 250,000.00 = Rp. 150,000.00
0.06 Kepala Tukang @Rp. 300,000.00 = Rp. 18,000.00
0.06 Pekerja @Rp. 200,000.00 = Rp. 12,000.00
0.00 Mandor @Rp. 350,000.00 = Rp. 1,050.00
Rp. 181,050.00
Bahan :
1.00 Set Kunci Stainless Steel 2x Putar @Rp. 275,000.00 = Rp. 275,000.00
Jumlah Rp. 456,050.00
5. An. SNI 2002, 1 Bh Pasang Engsel Pintu
Upah :
0.15 Tukang Kayu @Rp. 250,000.00 = Rp. 37,500.00
0.02 Kepala Tukang @Rp. 300,000.00 = Rp. 4,500.00
0.02 Pekerja @Rp. 200,000.00 = Rp. 3,000.00
0.00 Mandor @Rp. 350,000.00 = Rp. 262.50
Rp. 45,262.50
Bahan :
1.00 Bh Engsel 4" ex. SES @Rp. 20,000.00 = Rp. 20,000.00
Jumlah Rp. 65,262.50
6. An. SNI 2002, 1 Bh Pasang Engsel Jendela
Upah :
0.10 Tukang Kayu @Rp. 250,000.00 = Rp. 25,000.00
0.01 Kepala Tukang @Rp. 300,000.00 = Rp. 3,000.00
0.01 Pekerja @Rp. 200,000.00 = Rp. 2,000.00
0.00 Mandor @Rp. 350,000.00 = Rp. 175.00
Rp. 30,175.00
Bahan :
1.00 Bh Engsel 3" ex. SES @Rp. 15,000.00 = Rp. 15,000.00
Jumlah Rp. 45,175.00
8. An. SNI 2002, 1 Bh Pasang Tarikan ( Handle ) Jendela
Upah :
0.15 Tukang Kayu @Rp. 250,000.00 = Rp. 37,500.00
0.02 Kepala Tukang @Rp. 300,000.00 = Rp. 4,500.00
0.02 Pekerja @Rp. 200,000.00 = Rp. 3,000.00
0.00 Mandor @Rp. 350,000.00 = Rp. 262.50
Rp. 45,262.50
Bahan :
1.00 Bh Tarikan ( Handle ) Jendela @Rp. 20,000.00 = Rp. 20,000.00
Jumlah Rp. 65,262.50
9. An. SNI 2002, 1 Bh Pasang Gerendel Pintu dan Jendela
Upah :
0.20 Tukang Kayu @Rp. 250,000.00 = Rp. 50,000.00
0.02 Kepala Tukang @Rp. 300,000.00 = Rp. 6,000.00
0.02 Pekerja @Rp. 200,000.00 = Rp. 4,000.00
0.01 Mandor @Rp. 350,000.00 = Rp. 3,500.00
Rp. 63,500.00
Bahan :
1.00 Bh Grendel ex. SES @Rp. 20,000.00 = Rp. 20,000.00
Jumlah Rp. 83,500.00
IX. PEKERJAAN LISTRIK
1. 1 Titik Mengerjakan Lampu Dan Penerangan
5.00 M' Kabel NYM 2 X 2.5 mm @ Rp. 13,000.00 = Rp. 65,000.00
1.00 Set Acesories Listrik ( Lengkap ) @ Rp. 50,000.00 = Rp. 50,000.00
1.00 Ttk Pasang Instalasi Lampu @ Rp. 85,000.00 = Rp. 85,000.00
Rp. 200,000.00
2. 1 Titik Mengerjakan Stop Kontak
2.00 M' Kabel NYM 2 X 2.5 mm @ Rp. 13,000.00 = Rp. 26,000.00
1.00 Set Acesories Listrik ( Lengkap ) @ Rp. 50,000.00 = Rp. 50,000.00
1.00 Ttk Pasang Instalasi Stop Kontak @ Rp. 24,000.00 = Rp. 24,000.00
Jumlah Rp. 100,000.00
DAFTAR HARGA UPAH
A BAHAN DASAR
1 Batu Gunung / Batu Belah 15 - 20 cm M3 Rp 2,300,000.00 On Site / Lokasi Proyek
2 Batu Karang M 3
Rp 2,300,000.00 On Site / Lokasi Proyek
3 Batu Pecah / Kerikil / Split 2, 3 cm M3 Rp 2,300,000.00 On Site / Lokasi Proyek
4 Batu Pecah / Kerikil / Split 5, 7 cm M 3
Rp 2,300,000.00 On Site / Lokasi Proyek
5 Tanah Timbunan / Urug M3 Rp 1,000,000.00 On Site / Lokasi Proyek
6 Timbunan Cadas M 3
Rp 2,300,000.00 On Site / Lokasi Proyek
7 Pasir Pasang M 3
Rp 2,300,000.00 On Site / Lokasi Proyek
8 Pasir Plesteran M3 Rp 2,300,000.00 On Site / Lokasi Proyek
9 Pasir Cor / Beton M 3
Rp 2,300,000.00 On Site / Lokasi Proyek
10 Sirtu M3 Rp 1,300,000.00 On Site / Lokasi Proyek
11 Batu Bata Merah Bh Rp 10,000.00 On Site / Lokasi Proyek
12 Batu Tela Bh Rp 10,000.00 On Site / Lokasi Proyek
13 Semen Portland ( PC ) 50 kg Kg Rp 18,181.82 On Site / Lokasi Proyek
14 Semen Putih Kg Rp 6,500.00 On Site / Lokasi Proyek
15 Semen Warna Kg Rp 15,000.00 On Site / Lokasi Proyek
B BAHAN KAYU
1 Papan Kayu Kls I ( 3/30 x 400 ) M3 Rp 6,500,000.00 On Site / Lokasi Proyek
2 Balok Kayu Kls I ( 6/12 x 400 ) M3 Rp 6,500,000.00 On Site / Lokasi Proyek
3 Balok Kayu Kls I ( 5/10 x 400 ) M 3
Rp 6,500,000.00 On Site / Lokasi Proyek
4 Balok Kayu Kls I ( 5/5 x 400 ) M3 Rp 6,500,000.00 On Site / Lokasi Proyek
5 Kayu Kelas II M 3
Rp 5,500,000.00 On Site / Lokasi Proyek
6 Kayu Bakar / Putih M3 Rp 3,000,000.00 On Site / Lokasi Proyek
7 Dolken Kayu Galam / Mangi-mangi dia. 8 - 15 / 4 Meter Btg Rp 20,000.00 On Site / Lokasi Proyek
D BAHAN LANTAI
1 Tegel Keramik 20/20 Warna / Tekstur Kasar Doz Rp 72,000.00
2 Tegel Keramik 30/30 Warna / Motif Doz Rp 80,000.00
3 Tegel Keramik 40/40 Putih Polos Doz Rp 90,000.00
4 Marmer Putih 30/30 Standar / Polos Bh Rp 165,000.00
5 Marmer Putih 40/60 Standar / Polos Bh Rp 450,000.00
6 Marmer Hitam 40/60 Standar / Polos Bh Rp 480,000.00
7 Marmer Hitam 60/90 Standar / Polos Bh Rp 1,080,000.00
8 Plint Tegel 10/40 bh Rp
E BAHAN LANGIT-LANGIT
1 Tripleks 122 X 244 X 0,3 - 0,4 mm Lbr Rp 160,000.00
2 Multipleks 122 X 244 X 0,4 cm Lbr Rp 80,000.00
3 Multipleks 122 X 244 X 0,6 cm Lbr Rp 105,000.00
4 Multipleks 122 X 244 X 0,9 cm Lbr Rp 160,000.00
5 Playwood Lbr Rp 120,000.00
6 Gypsumboard 122 X 244 X 0,9 cm ex. Jayaboard Lbr Rp 95,000.00
7 List Profil Kayu M' Rp 8,750.00
8 List Profil Gypsum M' Rp 35,000.00
9 Compone (Dempul Gypsum) Kg Rp 35,000.00
10 Perban Gypsum Bh/Roll Rp 150,000.00
11 Lem Kayu Kg Rp 20,000.00
12 Kawat Besi Penggantung Kg Rp 25,000.00
F BAHAN KACA
1 Kaca Bening 5 mm Lbr Rp 220,000.00
2 Kaca Bening 3 mm Lbr Rp 135,000.00
3 Kaca Ryben 5 mm Lbr Rp 248,000.00
4 Kaca Ryben 3 mm Lbr Rp 147,000.00
5 Kaca Nako Dengan Trali 6 Klip Set Rp 220,000.00
6 Kaca Nako Dengan Trali 7 Klip Set Rp 248,000.00
7 Kaca Nako Dengan Trali 8 Klip Set Rp 275,000.00
8 Kaca Nako Dengan Trali 9 Klip Set Rp 308,000.00
G BAHAN ATAP
1 Atap Multiroof Lbr Rp 40,000.00
2 Nok Atap Multiroof Bh Rp 40,000.00
3 Rp
4 Rp
5 Aluminium Foil - Double Rool Rp 375,000.00
NO BAHAN MATERIAL SATUAN HARGA SATUAN KETERANGAN
6 Rp
7 Seng Gelombang Bjls 20 Lbr Rp 50,000.00
8 Seng Gelombang Bjls 30 Lbr Rp 68,000.00
9 Seng Plat Bjls 20 Lbr Rp 60,000.00
10 Seng Plat Bjls 30 Lbr Rp 80,000.00
H BAHAN PIPA
Air Bersih
1 Pipa PVC dia. 1/2" - 4 m M' Rp 3,750.00
2 Pipa PVC dia. 3/4" - 4 m M' Rp 8,750.00
3 Pipa Gip dia. 1" - 6 m M' Rp 18,330.00
4 Pipa Gip dia. 3" - 6 m M' Rp 375,000.00
5 Pipa Gip dia. 2" - 6 m M' Rp 350,000.00
6 Pipa Gip dia. 1½" - 6 m M' Rp 225,000.00
7 Talang PVC 4 - 8" M' Rp 43,750.00
Air Kotor
1 Pipa PVC dia. 1" - 4 m M' Rp 15,000.00
2 Pipa PVC dia. 2" - 4 m M' Rp 25,000.00
3 Pipa PVC dia. 3" - 4 m M' Rp 30,000.00
4 Pipa PVC dia. 4" - 4 m M' Rp 47,500.00
5 Elbow 4" Medium A Bh Rp 210,000.00
6 Elbow 2" Medium A Bh Rp 25,000.00
I BAHAN PENGGANTUNG
1 Kunci Tanam 2 x putar - Stainless Steel Bh Rp 275,000.00
2 Engsel Pintu 4" x 3" x 2.0 mm ex. SES Bh Rp 20,000.00
3 Engsel Jendela 3" x 2.5" x 2.0 mm ex. SES Bh Rp 15,000.00
4 Kunci Tanam Biasa 2 x putar Bh Rp 85,000.00
5 Grendel Pintu - Double ex. SES Bh Rp 20,000.00
6 Grendel Jendela ex. SES Bh Rp 20,000.00
7 Kait Angin Jendela Psg Rp 20,000.00
8 Tarikan ( Handle ) Jendela Bh Rp 20,000.00
9 Handle Pintu Stainless Steel Double Set Rp 750,000.00
10 Kunci Tanam Double Handle - Stainless Steel Set Rp 317,575.00
J BAHAN SANITAIR
1 Kran Air - KW 1 Bh Rp 35,000.00
2 Floor Drain Bh Rp 47,500.00
3 Shower Spray Siram / Mandi Bh Rp 275,000.00
4 Shower Spray Kloset Duduk Bh Rp 175,000.00
5 Kloset Duduk Toto - Warna Bh Rp 2,250,000.00
6 Kloset Jongkok Toto - Warna Bh Rp 450,000.00
7 Urinoir ex. Toto + Accesoris Unit Rp 1,750,000.00
8 Washtafel ex. Toto Unit Rp 550,000.00
9 Cermin Washtafel Unit Rp 125,000.00
10 Bak Cuci Piring 2 Lubang - Stainless Steel Unit Rp 750,000.00
11 Mesin Pompa Air 3.5 PK Unit Rp 3,750,000.00
12 Mesin Pompa Celup Unit Rp 3,750,000.00
13 Isolasi/Sealtape Bh Rp 1,500.00
14 Ijuk Kg Rp 21,000.00
15 14.5 29.5
PANJANG GORDING
6.04 9.44 5.38 3.00 2.00
9.64 7.84 6.04 3.00 2.00
11.23 6.24 7.64 3.00 2.00
12.84 4.64 9.24 3.00 2.00
14.44 3.04 10.84 3.00 2.00
5.38 12.44
16.15 183.50
RENCANA ANGGARAN BIAYA
PROGRAM :
PEKERJAAN : PENGADAAN GEDUNG KANTOR ATAU BANGUNAN LAINNYA
LOKASI : SUSUMUK DAN FRATAFEN
KABUPATEN : MAYBRAT
PROPINSI : PAPUA BARAT
TAHUN ANGGARAN : 2023
HARGA JUMLAH
No. URAIAN PEKERJAAN SAT VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersian Awal M² 72.00 94,000.00 6,768,000.00
2 Pemasangan Bowplank M 35.00 154,790.00 5,417,650.00
3 Foto Dokumentasi + Laporan Ls 1.00 7,000,000.00 7,000,000.00
4 Direksi Keet / Gudang Semen Dan Alat M² 9.00 2,401,509.09 21,613,581.82
5 Papan Nama Proyek Ls 1.00 1,500,000.00 1,500,000.00
II PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah M³ 42.54 94,000.00 3,998,995.00
2 Pasangan Pondasi Batu gunung M³ 11.90 7,183,886.36 85,488,247.73
3 Pasangan Batu Kosong M³ 8.47 3,428,850.00 29,042,359.50
4 Urugan Pasir Bawah Pondasi M³ 2.95 1,623,500.00 4,784,454.50
5 Urugan Pasir Bawah Lantai M³ 1.18 1,623,500.00 1,911,314.08
6 Urugan Tanah Kembali M³ 18.55 45,050.00 835,677.50
7 Urugan Tanah Dan Pemadatan M³ 4.71 1,227,500.00 5,780,444.80
III PEKERJAAN KAYU
1 Kolom Kayu besi 10/10 M³ 0.33 12,082,400.00 3,987,192.00
2 Pekerjaan Ring Balok Kayu Besi 10/10 M³ 0.35 12,082,400.00 4,228,840.00
3 Kuda-kuda kayu besi 5/10 M³ 2.20 12,082,400.00 26,581,280.00
4 Pekerjaan Gording kayu besi 5/10 M³ 1.20 12,082,400.00 14,498,880.00
5 Pekerjaan kusen kayu besi 5/10 M³ 0.67 14,705,000.00 9,852,350.00
6 Pekerjaan daun jendela kaca M² 1.00 1,203,500.00 1,203,500.00
7 Pekerjaan Daun pintu M² 1.42 1,210,000.00 1,714,449.00
IV PEKERJAAN PASANGAN DINDING DAN LANTAI
1 Pas. Batu Tela Dinding 1 pc : 4 ps M³ 8.37 2,413,127.27 20,197,875.27
2 Plesteran Dinding,t.15 mm M² 40.84 247,018.18 10,088,222.55
3 Pek. Acian Dinding M² 40.84 130,590.91 5,333,332.73
4 Pek Lantai Beton Tumbuk M³ 1.82 379,431.82 691,597.96
5 Pek Pasangan Tegel 30/30 M² 18.62 558,509.09 10,400,109.48
6 Pek Pasangan Tegel 10/10 M² 1.99 558,509.09 1,110,539.48
V PEKERJAAN ATAP DAN PLAFON
1 Atap Seng Gelombang M² 36.45 99,400.00 3,623,567.36
2 Rangka Plafon + tripleks 3mm M² 36.45 894,085.00 32,593,332.22
3 Pemasangan lisplank M 24.00 249,135.00 5,979,240.00
VI PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Kunci Pintu Bh 3.00 456,050.00 1,368,150.00
2 Engsel Pintu 4" - Stainles Steel Bh 3.00 65,262.50 195,787.50
3 Engsel Jendela Bh 3.00 45,175.00 135,525.00
4 Grendel Jendela / Ventilasi Bh 3.00 83,500.00 250,500.00
5 Hak Angin Jendela Bh 3.00 65,262.50 195,787.50
VII PEKERJAAN LISTRIK
1 Lampu SL 25 Watt Bh 2.00 200,000.00 400,000.00
2 Lampu SL 18 Watt Bh 3.00 200,000.00 600,000.00
3 Pemasangan Stop Kontak Bh 5.00 100,000.00 500,000.00
4 Pasang Meteran Ls 1.00 5,600,000.00 5,600,000.00
5 Instalasi Listrik Ttk 8.00 500,000.00 4,000,000.00
VIII PEKERJAAN PENGECATAN
1 Cat Dinding M² 110.20 160,515.00 17,688,753.00
2 Cat Kayu Kusen M² 11.50 57,850.00 665,275.00
3 Cat Kayu Lisplank M² 9.60 50,815.00 487,824.00
4 Cat Plafon M² 36.45 45,725.00 1,666,877.44
IX PEKERJAAN AKHIR
1 Pembersihan Akhir Ls 1.00 5,000,000.00 5,000,000.00
A. TOTAL #REF!
BACK UPA DATA
PEKERJAAN : PENGADAAN GEDUNG KANTOR ATAU BANGUNAN LAINNYA
LOKASI : SUSUMUK DAN FRATAFEN
KABUPATEN : MAYBRAT
PROPINSI : PAPUA BARAT
TAHUN ANGGARAN : 2023
a b c d e f=dxe g=f+g
I PEKERJAAN PERSIAPAN
1 Pembersian Awal M² 9.00 9.00 81.00 81.00
81.00
a b c d e=d f=e+f
2 Pemasangan Bowplank M
Galian Tanah 3.00 3.00 3.00
Panjang Depan 3.00 3.00 6.00
Panjang dinding dalam 1.50 1.50 7.50
Panjang Kanan 5.50 5.50 13.00
Panjang Kanan 1.50 1.50 14.50
Panjang Belakang 1.50 1.50 16.00
Panjang Belakang 4.50 4.50 20.50
Panjang sebelah kiri 1.50 1.50 22.00
Panjang teras 15.74 15.74 37.74
37.74
a b c d e=d f=e+f
3 Foto Dokumentasi + Laporan Ls 1.00 1.00 1.00
5 Papan Nama Proyek Ls 1.00 1.00 1.00
BACK UP DATA
PEKERJAAN : PENGADAAN GEDUNG KANTOR ATAU BANGUNAN LAINNYA
LOKASI : SUSUMUK DAN FRATAFEN
KABUPATEN : MAYBRAT
PROPINSI : PAPUA BARAT DAYA
TAHUN ANGGARAN : 2023
LUAS PENAMPANG
No. URAIAN PEKERJAAN SAT PANJANG TINGGI TOTAL
LEBAR
LEBAR ATAS
BAWAH
h = 1/2 x (e + f) x
a b c d e f g
gxd
II PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah
Panjang Depan 3.00 1.10 1.27 0.42 1.49
Panjang dinding dalam 3.00 1.10 1.27 0.42 1.49
Panjang dinding dalam 1.50 1.10 1.27 0.42 0.75
Panjang Kanan M³ 5.50 1.10 1.27 0.42 2.74
Panjang Belakang 1.50 1.10 1.27 0.42 0.75
Panjang Belakang 1.50 1.10 1.27 0.42 0.75
Panjang sebelah kiri 4.50 1.10 1.27 0.42 2.24
Panjang sebelah kiri 1.50 1.10 1.27 0.42 0.75
Panjang teras 16.00 0.30 0.30 0.45 2.16
LUAS PENAMPANG
No. URAIAN PEKERJAAN SAT PANJANG TINGGI TOTAL
LEBAR
LEBAR ATAS
BAWAH
h = 1/2 x (e + f) x
a b c d e f g
gxd
2 Pasangan Pondasi Batu gunung
F1 10.00 0.80 0.30 0.70 3.85
F2 4.50 0.66 0.30 0.50 1.08
F3 7.50 0.62 0.30 0.45 1.55
a b c d e f g=d xexf
LUAS PENAMPANG
No. URAIAN PEKERJAAN SAT PANJANG TOTAL
PANJANG TINGGI
a b c d e f g=dxexf
3 Pasangan Batu Kosong
F1 M³ 10.00 1.10 0.10 1.10
F2 4.50 0.96 0.10 0.43
F3 7.50 0.92 0.10 0.69
LUAS PENAMPANG
No. URAIAN PEKERJAAN SAT PANJANG TOTAL
PANJANG TINGGI
a b c d e f g=dxexf
4 Urugan Pasir Bawah Pondasi
F1 10.00 1.10 0.15 1.65
M³
F2 4.50 0.96 0.15 0.65
F3 7.50 0.92 0.15 1.04
No. URAIAN PEKERJAAN SAT PANJANG LEBAR TEBAL TOTAL
a b c d e f g=dxexf
5 Urugan Pasir Bawah Lantai M³
L1 2.88 1.88 0.10 0.54
L2 2.88 2.12 0.10 0.61
L3 1.38 1.38 0.10 0.19
LUAS PENAMPANG
JUMLAH
No. URAIAN PEKERJAAN SAT PANJANG TINGGI TOTAL
LEBAR SISI
LEBAR ATAS
BAWAH
i = 1/2 x (e + f) x
a b c d e f g h
(g x d) x h
6 Urugan Tanah Kembali
F1 10.00 0.47 0.20 0.47 2.00 3.15
M³
F2 4.50 0.47 0.20 0.47 2.00 1.42
F3 7.50 0.47 0.20 0.47 2.00 2.36
a b c d e f g=d xexf
F4 9.24 0.10 0.30 0.28
F5 9.56 0.10 0.30 0.29
a b c d e f g=dxexf
7 Urugan Tanah Dan Pemadatan M³
L1 2.88 1.88 0.30 1.62
L2 2.88 2.12 0.20 1.22
L3 1.38 1.38 0.20 0.38
BACK UP DATA
VOLUME
TOTAL
I=h+i
-
1.49
2.99
3.73
6.47
7.22
7.96
10.20
10.95
13.11
13.11
VOLUME
TOTAL
I=h+i
-
3.85
4.93
6.48
h=g+h
12.40
15.84
15.84
VOLUME
TOTAL
h=g+h
-
1.10
1.53
2.22
2.22
VOLUME
TOTAL
h=g+h
-
1.65
2.30
3.33
3.33
VOLUME
TOTAL
h=g+h
0.54
1.15
1.34
1.34
VOLUME
TOTAL
I=h+i
3.15
4.57
6.93
h=g+h
7.20
7.49
7.49
VOLUME
TOTAL
h=g+h
-
1.62
2.85
3.23
3.23
BACK UP DATA
PEKERJAAN : PENGADAAN GEDUNG KANTOR ATAU BANGUNAN LAINNYA
LOKASI : SUSUMUK DAN FRATAFEN
KABUPATEN : MAYBRAT
PROPINSI : PAPUA BARAT DAYA
TAHUN ANGGARAN : 2023
LUAS PENAMPANG
No. URAIAN PEKERJAAN SAT TINGGI JUMLAH TOTAL
PANJANG LEBAR
a b c d e f g h=dxexfxg
III PEKERJAAN KAYU
M³
1 Kolom Kayu besi 10/10 0.10 0.10 3.00 11.00 0.33
LUAS PENAMPANG
No. URAIAN PEKERJAAN SAT PANJANG TOTAL
PANJANG LEBAR
a b c d e f g=dxexf
2 Pekerjaan Ring Balok Kayu Besi 10/10
Panjang Depan 0.10 0.10 3.00 0.03
Panjang dinding dalam 0.10 0.10 3.00 0.03
Panjang dinding dalam 0.10 0.10 1.50 0.02
Panjang Kanan M³ 0.10 0.10 5.50 0.06
Panjang Belakang 0.10 0.10 1.50 0.02
Panjang Belakang 0.10 0.10 1.50 0.02
Panjang sebelah kiri 0.10 0.10 4.50 0.05
Panjang sebelah kiri 0.10 0.10 1.50 0.02
LUAS PENAMPANG JUMLAH KUDA -
No. URAIAN PEKERJAAN SAT PANJANG TOTAL
KUDA
PANJANG LEBAR
a b c d e f g h = (d x e x f) x g
3 Kuda-kuda kayu besi 5/10
Type kuda kuda 1 0.12 0.06 20.92 2.00 0.30
Type kuda-kuda 2 M³ 0.12 0.06 11.78 1.00 0.08
Type kuda-kuda 3 0.12 0.06 7.45 5.00 0.27
Type kuda-kuda 4 0.12 0.06 5.97 3.00 0.13
LUAS PENAMPANG
No. URAIAN PEKERJAAN SAT PANJANG TOTAL
PANJANG LEBAR
a b c d e f g=dxexf
4 Pekerjaan Gording kayu besi 5/10 M³ 0.10 0.05 183.00 0.92
LUAS PENAMPANG
No. URAIAN PEKERJAAN SAT PANJANG JUMLAH KUSEN TOTAL
PANJANG LEBAR
a b c d e f g h = (d x e x f) x g
5 Pekerjaan kusen kayu besi 5/10 M³
- Kusen pintu Utama 0.10 0.05 6.60 2.00 0.07
- Kusen Pintu Kamar mand 0.10 0.05 5.60 1.00 0.03
- Kusen Jendela 0.10 0.05 4.80 3.00 0.07
- Jelusi 0.10 0.05 2.20 1.00 0.01
LUAS PENAMPANG
No. URAIAN PEKERJAAN SAT JUMLAH DAUN JENDELA TOTAL
PANJANG LEBAR
a b c d e f g=dxexf
6 Pekerjaan daun jendela kaca 1.00 0.50 3.00 1.50
M²
LUAS PENAMPANG
No. URAIAN PEKERJAAN SAT JUMLAH KUSEN TOTAL
PANJANG LEBAR
a b c d e f g=dxexf
7 Pekerjaan Daun pintu M²
Daun pintu utama 2.00 0.80 2.00 3.20
Daun pintu km/ WC 2.00 0.60 1.00 1.20
BACK UP DATA
TOTAL
VOLUME
i=h+i
0.33
0.33
TOTAL
VOLUME
h=g+h
-
0.03
0.06
0.08
0.13
0.15
0.16
0.21
0.22
0.22
TOTAL
VOLUME
i=g+h
0.30
0.39
0.65
0.78
0.78
TOTAL
VOLUME
i=g+h
0.92
0.92
TOTAL
VOLUME
i=g+h
0.07
0.09
0.17
0.18
0.18
TOTAL
VOLUME
h=g+h
1.50
1.50
TOTAL
VOLUME
h=g+h
3.20
4.40
4.40
BACK UP DATA
PEKERJAAN : PENGADAAN GEDUNG KANTOR ATAU BANGUNAN LAINNYA
LOKASI : SUSUMUK DAN FRATAFEN
KABUPATEN : MAYBRAT
PROPINSI : PAPUA BARAT DAYA
TAHUN ANGGARAN : 2023
LUAS LOBANG
VOLUME
No. URAIAN PEKERJAAN SAT PANJANG TINGGI PINTU, JENDELA TEBAL DINDING TOTAL
TOTAL
DAN JELUSI
a b c d e f g h = (d x e - f) x g I=h+I
IV PEKERJAAN PASANGAN DINDING DAN LANTAI
1 Pas. Batu Tela Dinding 1 pc : 4 ps
M³
Dinding utama 15.00 2.90 8.53 0.15 5.25 5.25
Dinding teras depan 5.00 0.80 - 0.15 0.60 5.85
5.85
LUAS LOBANG
VOLUME
No. URAIAN PEKERJAAN SAT PANJANG TINGGI PINTU, JENDELA JUMLAH SISI TOTAL
TOTAL
DAN JELUSI
a b c d e f g g = (d x e - f) x g h=g+h
2 Plesteran Dinding,t.15 mm
Dinding utama M² 15.00 2.90 8.53 2.00 69.94 69.94
Dinding teras depan 5.00 0.80 2.00 8.00 77.94
77.94
LUAS LOBANG
VOLUME
No. URAIAN PEKERJAAN SAT PANJANG TINGGI PINTU, JENDELA JUMLAH SISI TOTAL
TOTAL
DAN JELUSI
a b c d e f g g = (d x e - f) x g h=g+h
3 Pek. Acian Dinding -
Dinding utama M² 15.00 2.90 8.53 2.00 69.94 69.94
Dinding teras depan 5.00 0.80 2.00 8.00 77.94
77.94
VOLUME
No. URAIAN PEKERJAAN SAT PANJANG LEBAR TEBAL LANTAI TOTAL
TOTAL
a b c d e f g=dxexf h=g+h
4 Pek Lantai Beton Tumbuk
L1 2.88 1.88 0.07 0.38 0.38
L2 M³ 2.88 2.12 0.07 0.43 0.81
L3 1.38 1.38 0.07 0.13 0.94
Rabat luar 17.86 0.50 0.12 1.07 2.01
2.01
VOLUME
No. URAIAN PEKERJAAN SAT PANJANG LEBAR TOTAL
TOTAL
a b c d e f=dxe g=f+g
5 Pek Pasangan Tegel 30/30 -
L1 2.88 1.88 5.41 5.41
M²
L2 2.88 2.12 6.11 11.52
-
11.52
-
VOLUME
No. URAIAN PEKERJAAN SAT PANJANG LEBAR TOTAL
TOTAL
a b c d e f=dxe g=f+g
6 Pek Pasangan Tegel 10/10
M²
L3 1.38 1.38 1.38 1.38
1.38
BACK UP DATA
PEKERJAAN : PENGADAAN GEDUNG KANTOR ATAU BANGUNAN LAINNYA
LOKASI : SUSUMUK DAN FRATAFEN
KABUPATEN : MAYBRAT
PROPINSI : PAPUA BARAT DAYA
TAHUN ANGGARAN : 2023
VOLUME
No. URAIAN PEKERJAAN SAT PANJANG LEBAR TOTAL
TOTAL
a b c d e f=dxe g=f+g
V PEKERJAAN ATAP DAN PLAFON
1 Atap Seng Gelombang A1 M² 6.22 4.72 29.36 29.36
A2 1.00 3.22 3.22 32.58
32.58
VOLUME
No. URAIAN PEKERJAAN SAT PANJANG LEBAR TOTAL
TOTAL
a b c d e f=dxe g=f+g
2 Rangka Plafon + tripleks 3mm
A1 1.88 2.88 5.41 5.41
A2 M² 1.00 3.22 3.22 8.63
A3 1.38 1.38 1.90 10.54
Keliling teras 20.68 0.80 16.54 27.08
27.08
TOTAL
No. URAIAN PEKERJAAN SAT PANJANG TOTAL
VOLUME
a b c d e=d f=e+f
3 Pemasangan lisplank -
4.72 4.72 4.72
6.22 6.22 10.94
M 1.50 1.50 12.44
1.00 1.00 13.44
3.22 3.22 16.66
7.22 7.22 23.88
23.88
TOTAL
No. URAIAN PEKERJAAN SAT JUMLAH TOTAL
VOLUME
a b c d e=d f=d
VI PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Kunci Pintu Bh 3.00 3.00 3.00
2 Engsel Pintu 4" - Stainles Steel Bh 6.00 6.00 6.00
3 Engsel Jendela Bh 6.00 6.00 6.00
4 Grendel Jendela Bh 3.00 3.00 3.00
5 Hak Angin Jendela Bh 6.00 6.00 6.00
BACK UP DATA
PEKERJAAN : PENGADAAN GEDUNG KANTOR ATAU BANGUNAN LAINNYA
LOKASI : SUSUMUK DAN FRATAFEN
KABUPATEN : MAYBRAT
PROPINSI : PAPUA BARAT DAYA
TAHUN ANGGARAN : 2023
LUAS LOBANG
No. URAIAN PEKERJAAN SAT PANJANG TINGGI PINTU, JENDELA JUMLAH SISI TOTAL
DAN JELUSI
a b c d e f g g = (d x e - f) x g
VIII PEKERJAAN PENGECATAN
1 Plesteran Dinding,t.15 mm
Dinding utama M² 15.00 2.90 8.53 2.00 69.94
Dinding teras depan 5.00 0.80 2.00 8.00
a b c d e f g g = (d + e) x f x g
2 Cat Kayu Kusen M²
Kusen pintu Utama 0.10 0.10 4.80 2.00 1.92
Kusen Pintu Kamar mandi/ Wc 0.10 0.10 4.70 1.00 0.94
Kusen Jendela 0.10 0.10 4.90 3.00 2.94
Jelusi 0.10 0.10 2.20 1.00 0.44
LEBAR
No. URAIAN PEKERJAAN SAT PANJANG LISPLANK JUMLAH SISI LISPLANK TOTAL
a b c d e f g=dxexf
3 Cat Lisplak
4.72 0.20 2.00 1.89
6.22 0.20 2.00 2.49
M² 1.50 0.20 2.00 0.60
1.00 0.20 2.00 0.40
3.22 0.20 2.00 1.29
7.22 0.20 2.00 2.89
a b c d e f=dxe
4 Cat Plafon
A1 1.88 2.88 5.41
A2 M² 1.00 3.22 3.22
A3 1.38 1.38 1.90
Keliling teras 20.68 0.80 16.54
-
a b c d e=d
IX PEKERJAAN AKHIR
Ls
1 Pembersihan Akhir 1.00 1.00
BACK UP DATA
VOLUME
TOTAL
h=g+h
69.94
77.94
77.94
VOLUME
TOTAL
h=g+h
1.92
2.86
5.80
6.24
6.24
TOTAL
VOLUME
h=g+h
-
1.89
4.38
4.98
5.38
6.66
9.55
9.55
VOLUME
TOTAL
g=f+g
-
5.41
8.63
10.54
27.08
27.08
VOLUME
TOTAL
f=e+f
1.00
1.00
REKAP BACK UP DATA
PEKERJAAN : PENGADAAN GEDUNG KANTOR ATAU BANGUNAN LAINNYA
LOKASI : SUSUMUK DAN FRATAFEN
KABUPATEN : MAYBRAT
PROPINSI : PAPUA BARAT
TAHUN ANGGARAN : 2023
VOLUME
REALISASI
No. URAIAN PEKERJAAN SAT KETERANGAN
KONTRAK JUMLAH JUMLAH
BANGUNAN 1 BANGUNAN 2
UNIT UNIT
a b c d f g h
I PEKERJAAN PERSIAPAN
1 Pembersian Awal M² 72.00 81.00 81.00 Volume Lebih
2 Pemasangan Bowplank M 22.00 37.74 38.74 Volume Lebih
3 Foto Dokumentasi + Laporan Ls 1.00 1.00 1.00 Volume Pas
5 Papan Nama Proyek Ls 1.00 1.00 1.00 Volume Pas
II PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah M³ 12.30 13.11 14.11 Volume Lebih
2 Pasangan Pondasi Batu gunung M³ 7.48 15.84 17.57 Volume Lebih
3 Pasangan Batu Kosong M³ 1.92 2.22 2.22 Volume Lebih
4 Urugan Pasir Bawah Pondasi M³ 1.85 3.33 3.33 Volume Lebih
5 Urugan Pasir Bawah Lantai M³ 1.18 1.34 1.34 Volume Lebih
6 Urugan Tanah Kembali M³ 4.62 7.49 7.49 Volume Lebih
7 Urugan Tanah Dan Pemadatan M³ 4.71 3.23 3.23 Volume Lebih
III PEKERJAAN KAYU
1 Kolom Kayu besi 10/10 M³ 0.30 0.33 0.33 Volume Lebih
2 Pekerjaan Ring Balok Kayu Besi 10/10 M³ 0.22 0.22 0.22 Volume Pas
3 Kuda-kuda kayu besi 5/10 M³ 0.69 0.78 0.78 Volume Lebih
4 Pekerjaan Gording kayu besi 5/10 M³ 0.88 0.92 0.92 Volume Lebih
5 Pekerjaan kusen kayu besi 5/10 M³ 0.15 0.18 0.18 Volume Lebih
6 Pekerjaan daun jendela kaca M² 1.00 1.50 1.50 Volume Lebih
7 Pekerjaan Daun pintu M² 1.42 4.40 4.40 Volume Lebih
IV PEKERJAAN PASANGAN DINDING DAN LANTAI
1 Pas. Batu Tela Dinding 1 pc : 4 ps M³ 5.83 5.85 5.85 Volume Lebih
2 Plesteran Dinding,t.15 mm M² 77.90 77.94 77.94 Volume Lebih
3 Pek. Acian Dinding M² 77.90 77.94 77.94 Volume Lebih
4 Pek Lantai Beton Tumbuk M³ 1.82 2.01 2.01 Volume Lebih
5 Pek Pasangan Tegel 30/30 M² 11.52 11.52 11.52 Volume Lebih
6 Pek Pasangan Tegel 10/10 M² 1.38 1.38 1.38 Volume Lebih
V PEKERJAAN ATAP DAN PLAFON
1 Atap Seng Gelombang M² 25.77 32.58 32.58 Volume Lebih
2 Rangka Plafon + tripleks 3mm M² 13.89 27.08 27.08 Volume Lebih
3 Pemasangan lisplank M 21.48 23.88 23.88 Volume Lebih
VI PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Kunci Pintu Bh 3.00 3.00 3.00 VolumePas
2 Engsel Pintu 4" - Stainles Steel Bh 3.00 6.00 6.00 Volume Lebih
3 Engsel Jendela Bh 3.00 6.00 6.00 Volume Lebih
4 Grendel Jendela / Ventilasi Bh 3.00 3.00 3.00 VolumePas
5 Hak Angin Jendela Bh 3.00 6.00 6.00 Volume Lebih
VIII PEKERJAAN PENGECATAN
1 Cat Dinding M² 77.90 77.94 77.94 Volume Lebih
2 Cat Kayu Kusen M² 5.20 6.24 6.24 Volume Lebih
3 Cat Kayu Lisplank M² 8.59 9.55 9.55 Volume Lebih
4 Cat Plafon M² 13.89 27.08 27.08 Volume Lebih
IX PEKERJAAN AKHIR
1 Pembersihan Akhir Ls 1.00 1.00 1.00 Volume Pas
Menyetujui :
PEJABAT PEMBUAT KOMITMEN
DINAS PEKERJAAN UMUM
HARGA JUMLAH
No. URAIAN PEKERJAAN SAT VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersian Awal M² 72.00 94,000.00 6,768,000.00
2 Pemasangan Bowplank M 22.00 154,790.00 3,405,380.00
3 Foto Dokumentasi + Laporan Ls 1.00 7,000,000.00 7,000,000.00
5 Papan Nama Proyek Ls 1.00 1,500,000.00 1,500,000.00
II PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah M³ 12.30 94,000.00 1,155,805.20
2 Pasangan Pondasi Batu gunung M³ 7.48 7,183,886.36 53,735,470.00
3 Pasangan Batu Kosong M³ 1.92 3,428,850.00 6,600,536.25
4 Urugan Pasir Bawah Pondasi M³ 1.85 1,623,500.00 3,007,371.40
5 Urugan Pasir Bawah Lantai M³ 1.18 1,623,500.00 1,911,314.08
6 Urugan Tanah Kembali M³ 4.62 45,050.00 208,131.00
7 Urugan Tanah Dan Pemadatan M³ 4.71 1,227,500.00 5,780,444.80
III PEKERJAAN KAYU
1 Kolom Kayu besi 10/10 M³ 0.30 12,082,400.00 3,624,720.00
2 Pekerjaan Ring Balok Kayu Besi 10/10 M³ 0.22 12,082,400.00 2,658,128.00
3 Kuda-kuda kayu besi 5/10 M³ 0.69 12,082,400.00 8,336,856.00
4 Pekerjaan Gording kayu besi 5/10 M³ 0.88 12,082,400.00 10,632,512.00
5 Pekerjaan kusen kayu besi 5/10 M³ 0.15 14,705,000.00 2,205,750.00
6 Pekerjaan daun jendela kaca M² 1.00 1,203,500.00 1,203,500.00
7 Pekerjaan Daun pintu M² 1.42 1,210,000.00 1,714,449.00
IV PEKERJAAN PASANGAN DINDING DAN LANTAI
1 Pas. Batu Tela Dinding 1 pc : 4 ps M³ 5.83 2,413,127.27 14,068,532.00
2 Plesteran Dinding,t.15 mm M² 77.90 247,018.18 19,242,716.36
3 Pek. Acian Dinding M² 77.90 130,590.91 10,173,031.82
4 Pek Lantai Beton Tumbuk M³ 1.82 379,431.82 691,597.96
5 Pek Pasangan Tegel 30/30 M² 11.52 558,509.09 6,434,024.73
6 Pek Pasangan Tegel 10/10 M² 1.38 558,509.09 770,742.55
V PEKERJAAN ATAP DAN PLAFON
1 Atap Seng Gelombang M² 25.77 99,400.00 2,561,975.36
2 Rangka Plafon + tripleks 3mm M² 13.89 894,085.00 12,415,353.72
3 Pemasangan lisplank M 21.48 249,135.00 5,351,419.80
VI PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Kunci Pintu Bh 3.00 456,050.00 1,368,150.00
2 Engsel Pintu 4" - Stainles Steel Bh 3.00 65,262.50 195,787.50
3 Engsel Jendela Bh 3.00 45,175.00 135,525.00
4 Grendel Jendela / Ventilasi Bh 3.00 83,500.00 250,500.00
5 Hak Angin Jendela Bh 3.00 65,262.50 195,787.50
VII PEKERJAAN PENGECATAN
1 Cat Dinding M² 77.90 160,515.00 12,504,118.50
2 Cat Kayu Kusen M² 5.20 57,850.00 300,820.00
3 Cat Kayu Lisplank M² 8.59 50,815.00 436,602.48
4 Cat Plafon M² 13.89 45,725.00 634,941.92
VIII PEKERJAAN AKHIR
1 Pembersihan Akhir Ls 1.00 5,100,000.00 5,100,000.00
Jumlah 5,100,000.00
A. TOTAL #REF!