Anda di halaman 1dari 71

REKAPITULASI

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : KOS-KOSAN
LOKASI : LABUAN BAJO
KABUPATEN : MANGGARAI BARAT
TAHUN ANGGARAN : 2022

Total Harga Satuan


No Uraian Pekerjaan
(Rp.)
A PEKERJAAN PERSIAPAN 6,500,000.00
B PEKERJAAN TANAH DAN URUGAN 85,495,961.00
C PEKERJAAN PASANGAN PONDASI 227,304,610.00
D PEKERJAAN PASANGAN TEMBOK, PLESTERAN DAN ACIAN 640,892,254.00
E PEKERJAAN BETON BERTULANG 953,106,000.00
F PEKERJAAN PINTU, JENDELA, RILLING TANGGA 481,684,000.00
G PEKERJAAN ATAP & PLAFOND 377,158,106.00
H PEKERJAAN MEKANIKAL ELEKTRIKAL dan PLAMBING 264,314,590.00
I PEKERJAAN GRANIT DAN RABAT LANTAI 401,081,000.00
J PEKERJAAN SANITAIR 165,559,000.00
K PEKERJAAN PENGECATAN 132,841,000.00
M PEKERJAAN LAIN-LAIN 4,500,000.00

a TOTAL PEKERJAAN FISIK 3,740,436,521.00


b PPN 11% x a 411,448,017.31
c TOTAL ( a + b ) 4,151,884,538.31
d DIBULATKAN 4,151,884,000.00
Terbilang :
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : KOS-KOSAN
LOKASI : LABUAN BAJO
KABUPATEN : MANGGARAI BARAT
TAHUN ANGGARAN : 2022

Bobot
Total Harga Satuan
No Uraian Pekerjaan Satuan Volume Harga Satuan
(Rp.) %
A PEKERJAAN PERSIAPAN 6,500,000.00
1 Penyewaan Scafolding Ls 1.00 1,500,000.00 1,500,000.00 0.04
2 Penyediaan Air Kerja Ls 1.00 2,000,000.00 2,000,000.00 0.05
4 Pekerjaan Pengukuran dan Pemasangan Bouwplank Ls 1.00 3,000,000.00 3,000,000.00 0.08
Jumlah Pekerjaan Persiapan 6,500,000.00 0.17
B PEKERJAAN TANAH DAN URUGAN 85,495,961.00
3
1 Pek.Galian Tanah Pondasi Foot plat dengan cara mekanis M 86.40 93,248.00 8,056,627.00 0.22
3
2 Pek. Galian Tanah Pondasi Menerus dengan Cara Mekanis M 215.04 93,248.00 20,052,050.00 0.54
3
4 Pek. Urugan Tanah Kembali Bekas Galian M 100.48 25,261.00 2,538,225.00 0.07
Pek. Urugan Tanah Peninggi Lantai Menggunakan tanah Urug dipadatkan 3
5 M 148.65 271,741.00 40,394,300.00 1.08
semi mekanis( Stamper)
3
7 Pek. Urugan Pasir dibawah rabat lantai Bangunan M 14.87 837,229.00 12,445,409.00 0.33
3
9 Pek. Urugan pasir dibawah lantai Kerja pondasi Foot plat M 2.40 837,229.00 2,009,350.00 0.05
Jumlah Pekerjaan Tanah dan Urugan 85,495,961.00 2.29
C PEKERJAAN PASANGAN PONDASI 227,304,610.00
3
1 Pek. Pas. Pondasi Bangunan Batu Belah / Batu Kali Camp. 1 Pc : 4 Psr M 153.60 1,223,921.00 187,994,266.00 5.03
3
2 Pek Pas. Batu Kosong/Aanstamping M 40.32 809,942.00 32,656,861.00 0.87
Pek Coran Rabat Lantai Kerja camp. 1PC : 3 Psr : 5 Krkl di Bawah Foot Plat 3
4 M 4.80 1,386,142.21 6,653,483.00 0.18
t=10 cm
Jumlah Pekerjaan Pondasi 227,304,610.00 6.08
D PEKERJAAN PASANGAN TEMBOK, PLESTERAN DAN ACIAN 640,892,254.00
Pek. Pas. Tembok Bata ringan/ Hebel tebal 10 cm dengan Semen MU 380 2
1 M 1053.60 268,450.00 282,838,920.00 7.56
(Untuk Perekat Bata)
Pek. Plesteran Tembok Bata Ringan tebal 8 mm dengan menggunakan 2
2 M 2027.00 112,110.00 227,246,970.00 6.08
Semen MU 301 (Untuk Plesteran)
Pek. Acian Dinding /Tembok Bata Ringan dengan Semen MU 270 (Untuk 2
3 M 2027.00 64,532.00 130,806,364.00 3.50
acian )
Jumlah Pekerjaan Tembok, Plesteran dan Acian 640,892,254.00 17.13
E PEKERJAAN BETON BERTULANG 953,106,000.00
3
1 Pekerjaan Pondasi Foot Plat K - 250 Type 1 ( FP - 1 ) 100 x 100 x 30 cm M 14.40 4,145,339.00 59,692,882.00 1.60
Pekerjaan Pengecoran Beton Bertulang K-250 Footing Kolom FK1 - 30 x 30 3
4 M 6.05 8,383,100.00 50,700,989.00 1.36
cm
3
13 Pekerjaan Pengecoran Beton Bertulang K-250 Kolom K1 - 30 x 30 cm M 27.65 7,990,565.00 220,923,141.00 5.91
3
14 Pekerjaan Pengecoran Beton Bertulang K-175 Kolom KP - 12 x 12 cm M 4.63 13,013,655.00 60,266,757.00 1.61
3
16 Pekerjaan Pengecoran Beton Sloof K-250 (BS1) 20 x 35 cm M 18.34 5,895,631.00 108,125,873.00 2.89
3
18 Pekerjaan Pengecoran Beton Sloof K-175 (BSa) 15 X 20 cm M 1.50 5,745,384.00 8,618,076.00 0.23
3
20 Pekerjaan Beton Balok Induk K-250 (B2) 25 x 35 cm M 15.07 7,096,300.00 106,905,760.00 2.86
3
22 Pekerjaan Beton Balok Anak K-250 (Ba) 20 x 30 cm M 2.30 8,043,573.00 18,500,218.00 0.49
3
24 Pekerjaan Pengecoran Beton Balok Tangga K-250 (BT) 20 x 40 cm M 0.72 7,606,433.00 5,476,632.00 0.15
3
27 Pekerjaan Beton Ring Balok K-250 (RB1) 20 x 30 cm M 15.72 6,950,394.00 109,260,194.00 2.92
3
29 Pekerjaan Pengecoran Beton Ring Balok K-175 (RB2) 15 X 20 cm M 1.50 8,875,876.00 13,313,814.00 0.36
3
30 Pekerjaan Beton Plat Lantai K-250 (BP1) T 12 cm M 34.18 5,322,946.00 181,917,002.00 4.86
3
36 Pekerjaan Coran Beton Plat Tangga K-250 (BP7) T 12 cm M 1.58 5,964,287.00 9,404,488.00 0.25
Jumlah Pekerjaan Beton Bertulang 953,106,000.00 25.48
Bobot
Total Harga Satuan
No Uraian Pekerjaan Satuan Volume Harga Satuan
(Rp.) %
F PEKERJAAN PINTU, JENDELA, RILLING TANGGA 481,684,000.00
1 Pekerjaan Pintu dan Jendela Aluminium
1 Pintu lengkap Assesories Type P-01 Unit 32.00 3,153,224.11 100,903,172.00 2.70
2 Pintu lengkap Assesories Type P-02 Unit 64.00 2,937,353.56 187,990,628.00 5.03
3 Jendela lengkap Assesories Type J-01 Unit 32.00 2,092,339.46 66,954,863.00 1.79
4 Boven Unit 32.00 240,196.39 7,686,284.00 0.21
Pengadaan dan Pemasangan Rilling Tangga dan Teras pada lt.2 besi hollow + 2
2 M 100.64 1,173,975.00 118,148,844.00 3.16
Handraill kayu Jati
Jumlah Pekerjaan Pintu, Jendela dan Rilling Tangga 481,684,000.00 12.88
G PEKERJAAN ATAP & PLAFOND 377,158,106.00
2
1 Pekerjaan Kuda-kuda Baja Ringan / Main truss C - 75 - 75 Klas A M 400.00 362,057.00 144,822,800.00 3.87
2
2 Pekerjaan Pas. Atap Multiroof Berpasir M 420.00 100,619.00 42,259,980.00 1.13
3 Pekerjaan Pas. Jurai atap dan Nok Multiroof Berpasir M 50.00 64,079.00 3,203,950.00 0.09
5 Pekerjaan Lisplang Papan Kalsiplang Board tebal 9 MM L = CM 20 M 132.00 110,510.00 14,587,320.00 0.39
2
6 Pekerjaan Plafond Gypsum Ex. Elephant tebal 9 MM M 700.00 74,838.00 52,386,600.00 1.40
Pekerjaan Kerangka Plafond besi hollow 35.35.2 mm dan 15,35,2 mm , 2
7 M 700.00 137,988.00 96,591,600.00 2.58
modul 60 x 120 cm
8 Pekerjaan Pasangan List Plafon Shadowline/Tali air M 947.20 24,605.00 23,305,856.00 0.62
Jumlah Pekerjaan Atap dan Plafon 377,158,106.00 10.08
H PEKERJAAN MEKANIKAL ELEKTRIKAL dan PLAMBING 264,314,590.00
I ELECTRICAL WORKS
3 Panel Lantai 1 Unit 1.00 5,000,000.00 5,000,000.00 0.13
4 Panel Lantai 2 Unit 1.00 5,000,000.00 5,000,000.00 0.13
ELECTRICAL FEEDER CABLES.
Electrical feeder cable from KWH PLN to LVMDP FRC 4 X 150
1 Mtr' 12.00 1,850,000.00 22,200,000.00 0.59
mm² + BC 95 mm2
2 Panel Lantai 1 NYY 4X50 mm + BC 35 mm Mtr' 6.00 466,900.00 2,801,400.00 0.07
3 Pump Room NYY 3X4 mm Mtr' 14.00 101,500.00 1,421,000.00 0.04
4 PENERANGAN NYY 3X4 mm Mtr' 33.00 101,500.00 3,349,500.00 0.09
5 STOP KONTAK NYY 3X10 mm Mtr' 33.00 126,300.00 4,167,900.00 0.11
7 Panel Lantai 2 NYY 4X50 mm + BC 35 mm Mtr' 12.00 466,900.00 5,602,800.00 0.15
8 PENERANGAN NYY 3X4 mm Mtr' 43.00 101,500.00 4,364,500.00 0.12
9 STOP KONTAK NYY 3X10 mm Mtr' 43.00 126,300.00 5,430,900.00 0.15
Panel Pump Room
15 PP TRANSFER PUMP NYY 3X4 Mtr' 12.00 101,500.00 1,218,000.00 0.03
16 PP BOOTER PUMP NYY 3X4 Mtr' 12.00 101,500.00 1,218,000.00 0.03
17 Testing Comisioning Lot 1.00 1,000,000.00 1,000,000.00 0.03
a. Cable installation
Lantai 1
1 Instalasi Penerangan NYM 3x2.5 mm2 in HIC Clipsal 20 mm. Point 80.00 278,000.00 22,240,000.00 0.59
2 Instalasi Stop Kontak, NYM 3x2.5 mm2 in HIC Clipsal 20mm. Point 80.00 278,000.00 22,240,000.00 0.59
Lantai 2
1 Instalasi Penerangan NYM 3x2.5 mm2 in HIC Clipsal 20 mm. Point 80.00 278,000.00 22,240,000.00 0.59
2 Instalasi Stop Kontak, NYM 3x2.5 mm2 in HIC Clipsal 20mm. Point 80.00 278,000.00 22,240,000.00 0.59
b. Lampu, Accessories & Exhaust Fan
Lantai 1
1 Downlight 10 W Pcs 80.00 186,800.00 14,944,000.00 0.40
3 Saklar Tunggal Pcs 16.00 33,800.00 540,800.00 0.01
4 Saklar Ganda Pcs 32.00 46,000.00 1,472,000.00 0.04
5 Stop Kontak Pcs 32.00 38,000.00 1,216,000.00 0.03
Lantai 2
1 Downlight 10 W Pcs 80.00 186,800.00 14,944,000.00 0.40
3 Saklar Tunggal Pcs 16.00 33,800.00 540,800.00 0.01
4 Saklar Ganda Pcs 32.00 46,000.00 1,472,000.00 0.04
5 Stop Kontak Pcs 32.00 38,000.00 1,216,000.00 0.03
Instalasi Penangkal petir
1 Penangkal Petir Radius 100 Meter Pcs 1.00 7,500,000.00 7,500,000.00 0.20
2 Kabel BC-50 Mtr 12.00 345,000.00 4,140,000.00 0.11
3 Grounding System Ls 1.00 7,500,000.00 7,500,000.00 0.20
Jumlah Pekerjaan Elektikal Works 207,219,600.00
Bobot
Total Harga Satuan
No Uraian Pekerjaan Satuan Volume Harga Satuan
(Rp.) %
Jumlah Pekerjaan Electronic Works -
III PLUMBING WORK
1 Main Equipmwnt Plumbing
1 Transfer Pump 1 Set Pompa & Accessories Unit 1.00 5,000,000.00 5,000,000.00 0.13
2 Boster Pump 1 Set Pompa & Accessories Unit 1.00 5,000,000.00 5,000,000.00 0.13
3 Fitting & Accessories Lot 1.00 500,000.00 500,000.00 0.01
4 Tandon Air Stainles Steel 2000 Lot 1.00 8,975,392.00 8,975,392.00 0.24
2 Instalation
Pipa Header
1 PVC AW 2' Mtr' 8.00 83,471.00 667,768.00 0.02
2 PVC AW 1 1/2' Pipa Tegak Mainline dari Header Ke tanki atas Mtr' 40.00 70,513.00 2,820,520.00 0.08
PVC AW 1 1/2' Pipa Tegak Mainline dari pompa Header Pompa boster ke
3 Mtr' 40.00 70,513.00 2,820,520.00 0.08
pipa tegak mainline
2a Lantai 1
1 Cold water plumbing
1 Pipa PVC AW Ø1" Mtr' 18.00 40,700.00 732,600.00 0.02
2 Pipa PVC AW Ø1/2" Mtr' 48.00 27,742.00 1,331,616.00 0.04
3 Pipe fitting Lot 1.00 1,500,000.00 1,500,000.00 0.04
4 valve 1 ' PVC Pcs 1.00 168,200.00 168,200.00 0.00
3 Waste & Sewage Water Plumbing
1 PVC AW dia. 4" Mtr' 19.00 213,185.00 4,050,515.00 0.11
2 PVC AW dia. 3" Mtr' 17.00 139,700.00 2,374,900.00 0.06
3 PVC AW dia. 2" Mtr' 4.00 83,471.00 333,884.00 0.01
4 Floor drain Pcs 5.00 88,526.00 442,630.00 0.01
5 V trap Pcs 5.00 125,000.00 625,000.00 0.02
6 CO Pcs 2.00 291,890.00 583,780.00 0.02
7 Pipe fitting Lot 1.00 1,800,000.00 1,800,000.00 0.05
2b Lantai 2
1 Cold water plumbing
1 Pipa PVC AW Ø1" Mtr' 40.00 40,700.00 1,628,000.00 0.04
2 Pipa PVC AW Ø1/2" Mtr' 48.00 27,742.00 1,331,616.00 0.04
3 Pipe fitting Lot 1.00 1,500,000.00 1,500,000.00 0.04
4 valve 1 ' PVC Pcs 1.00 168,200.00 168,200.00 0.00
3 Waste & Sewage Water Plumbing
1 PVC AW Wavin dia. 4" Mtr' 23.00 213,185.00 4,903,255.00 0.13
2 PVC AW Wavin dia. 3" Mtr' 29.00 139,700.00 4,051,300.00 0.11
3 PVC AW Wavin dia. 2" Mtr' 4.00 83,471.00 333,884.00 0.01
4 Floor drain Pcs 5.00 88,526.00 442,630.00 0.01
5 V trap Pcs 5.00 125,000.00 625,000.00 0.02
6 CO Pcs 2.00 291,890.00 583,780.00 0.02
7 Pipe fitting Rucika class TS Lot 1.00 1,800,000.00 1,800,000.00 0.05
Jumlah Pekerjaan Plumbing Works 57,094,990.00
Total Pekerjaan Mekanikal Elektrikal dan Plumbing 264,314,590.00 7.07
I PEKERJAAN GRANIT DAN RABAT LANTAI 401,081,000.00
3
1 Pek. Rabat Beton Lantai Camp 1Pc : 3 Psr : 5 Krkl t = 7 cm M 49.00 1,386,142.21 67,921,000.00 1.82
2
2 Pek. Pas. Granit 60 x 60 Anti Slip Bordes dan anak Tangga M 14.90 417,405.00 6,219,000.00 0.17
2
3 Pek. Pas. Lantai Granit 60 x 60 CM M 374.40 354,661.00 132,785,000.00 3.55
2
4 Pek. Pas. Granit Anti Slip Ukuran 60 x 60 CM Lantai ; Toilet + Teras M 294.40 417,405.00 122,884,000.00 3.29
2
5 Pek. Pas. Granit dinding 60 x 60 cm ; Toilet M 153.60 464,009.00 71,272,000.00 1.91
Jumlah Pekerjaan Granit dan Rabat Lantai 401,081,000.00 10.72
Bobot
Total Harga Satuan
No Uraian Pekerjaan Satuan Volume Harga Satuan
(Rp.) %
J PEKERJAAN SANITAIR 165,559,000.00
Pekerjaan 2 Unit Septiktank dan Peresapannya
3
1 Pekerjaan Galian Tanah Biasa cara Mekanis M 17.80 25,297.00 450,000.00 0.01
2
2 Pasangn bata Merah Camp. 1PC : 4 Psr M 40.42 209,565.00 8,471,000.00 0.23
2
3 Plesteran Dinding tebal 15 mm Camp. 1PC : 3 Psr M 40.36 78,506.00 3,169,000.00 0.08
2
4 Acian Bidang diplester M 29.08 41,222.00 1,199,000.00 0.03
3
5 Coran Beton Sloof 15/20 CM K-250 M 0.74 5,812,419.00 4,292,000.00 0.11
3
6 Coran Beton Kolom 12/12 CM K-250 M 0.40 13,080,690.00 5,274,000.00 0.14
3
7 Pekerjaan Plat Beton tebal 12 CM K-250 M 1.12 5,322,946.00 5,979,000.00 0.16
3
8 Urugan Batu Kosong M 0.40 409,285.00 164,000.00 0.00
3
9 Urugan Pasir M 0.40 837,229.00 335,000.00 0.01
2
10 Pemasangan Ijuk M 0.20 214,694.00 43,000.00 0.00
11 Pipa Hawa ( P=1.00 M ) GIP 1.5" Mtr' 2.00 251,500.00 503,000.00 0.01
3
12 Coran Rabat Lantai Camp. 1PC : 3 Psr : 5 Kerikil M 0.20 1,476,163.00 295,000.00 0.01
3
13 Urugan Pasir dibawah lantai M 0.20 837,229.00 167,000.00 0.00
Pas. Bak Peresapan Air Kotor 1 Unit
3
1 Pekerjaan Galian Tanah Biasa cara Mekanis M 2.37 25,297.00 60,000.00 0.00
2
2 Pasangn bata Merah Camp. 1PC : 4 Psr M 5.75 209,565.00 1,205,000.00 0.03
3
3 Coran Beton Sloof 15/20 CM K-250 M 0.03 5,812,419.00 196,000.00 0.01
3
4 Coran Beton Kolom 12/12 CM K-250 M 0.08 13,080,690.00 1,055,000.00 0.03
3
5 Pekerjaan Plat Beton tebal 12 CM K-250 M 0.20 5,322,946.00 1,079,000.00 0.03
3
6 Urugan Batu Kosong M 0.20 409,285.00 82,000.00 0.00
3
7 Urugan Pasir M 0.20 837,229.00 167,000.00 0.00
2
8 Pemasangan Ijuk M 0.10 214,694.00 21,000.00 0.00
9 Pipa Penguap GIP SNI Ø 1.5 " Mtr' 1.00 251,500.00 252,000.00 0.01
Pek. Bak Penampung Air Bersih Kap. 3000 L 1 Unit
3
1 Pekerjaan Galian Tanah Biasa cara Mekanis M 5.38 25,297.00 136,000.00 0.00
2
2 Pasangn bata Merah Camp. 1PC : 4 Psr M 4.28 209,565.00 897,000.00 0.02
3
3 Pekerjaan Pengecoran Beton Bertulang Bak Air Tebal 15 cm K-250 M 2.38 4,935,496.00 11,756,000.00 0.31
2
4 Plesteran Dinding kedap Air camp 1Pc : 2 PP M 13.00 82,468.00 1,072,000.00 0.03
2
5 Acian Bidang diplester M 13.00 41,222.00 536,000.00 0.01
2
6 Pek. Pengecatan Aqua Proof M 13.00 33,085.00 430,000.00 0.01
Pek. Pas Kloset Duduk American Standard Complete + Tabung Unit 32.00 3,602,320.00 115,274,000.00 3.08
Pek. Biaya Pengujian aliran air dalam Pipa Air Bersih, Pipa Faces, Pipa Air Kotor Ls 1.00 1,000,000.00 1,000,000.00 0.03
Jumlah Pekerjaan Sanitair 165,559,000.00 4.43
K PEKERJAAN PENGECATAN 132,841,000.00
Pengecatan Tembok Exterior dan Interior menggunakan Cat Tembok Jotun 2
4 M 2027.00 54,304.00 110,074,000.00 2.94
setara
2
6 Cat Plafond menggunakan Cat Jotun Warna Cream susu M 700.00 32,524.00 22,767,000.00 0.61
Jumlah Pekerjaan Pengecatan 132,841,000.00 3.55
M PEKERJAAN LAIN-LAIN 4,500,000.00
1 Pembersihan bahan bekas pekerjaan Ls 1.00 4,500,000.00 4,500,000.00 0.12
Jumlah Pekerjaan Lain - Lain 4,500,000.00 0.12
a TOTAL PEKERJAAN FISIK Rp 3,740,436,521.00 100.00
b PPN 11% x a Rp 411,448,017.31
c TOTAL ( a + b ) Rp 4,151,884,538.31
d DIBULATKAN Rp 4,151,884,000.00
Terbilang :
DATA SURVEY BAHAN LOKAL DAN NON LOKAL TAHUN ANGGARAN 2022

DIRENCANAKAN

LOKASI/ QUARY
KAPASITAS/SAT

MATERIAL/BAH
SUMBER DATA

BARANG YANG
SMS/WA/TELP/

LANGSUNG

MAXIMUM

RENCANA
BARANG
SATUAN

SATUAN
HARGA

HARGA
TANYA

UAN
VIA

AN
NO MATERIAL/BAHAN SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP /
PENDEKATAN
LANGSUNG
Data Via
I BAHAN LOKAL

1 Balok Kayu Kelas I (Lokal) Jati 130,000.00 / Btg (P=2 M)70 M³ 9,100,000.00 9,100,000.00 9,100,000.00 M³ L. Bajo

2 Papan Kayu Kelas I (Lokal) Jati 125,000.00 / Lbr (P=2 M) 63 M³ 7,875,000.00 7,875,000.00 7,875,000.00 M³ L. Bajo

3 Papan Kayu Klas II Lokal 60,000.00 / Lbr 51 M³ 3,060,000.00 3,060,000.00 3,060,000.00 M³ L. Bajo

4 Balok Kayu Klas II 5/7 CM (Lokal) 40,000.00 / Btg (P=3 M )96 M³ 3,840,000.00 3,840,000.00 3,840,000.00 M³ L. Bajo

5 Balok Kayu Klas II 8/12 CM (Lokal) 80,000.00 / Btg (P=3 M )35 Btg 2,800,000.00 2,800,000.00 2,800,000.00 M³ L. Bajo

6 Kayu Klas III (Lokal) 40,000.00 / Btg (P=3 M )56 Btg 2,240,000.00 2,240,000.00 2,240,000.00 M³ L. Bajo

7 Bambu Diameter 6 - 8 / 600 cm 35,000.00 / Btg 1 Btg 35,000.00 35,000.00 35,000.00 Btg L. Bajo

8 Kayu Dolken/Perancah (Ø 8-10 ) cm, P= 4 m 15,000.00 / Btg 1 btg 15,000.00 15,000.00 15,000.00 btg L. Bajo

9 Ready Mix K-300 . / M3 M³ - - M³ L. Bajo

10 Ready Mix K-250 / M3 M³ - - M³ L. Bajo

11 Ready Mix K-200 / M3 M³ - - M³ L. Bajo

12 Batu Pecah 2 - 3 cm 250,000.00 / M3 1 M3 250,000.00 250,000.00 250,000.00 M³ L. Bajo

13 Batu Belah/Batu Kali 400,000.00 / Ret 3 M3 133,333.33 133,333.33 133,333.00 M³ L. Bajo

14 Pasir beton 150,000.00 / M3 1 M3 150,000.00 150,000.00 150,000.00 M³ Wae Longge

15 Pasir Pasang 150,000.00 / M3 1 M3 150,000.00 150,000.00 150,000.00 M³ Wae Longge

16 Pasir Urug 600,000.00 / Ret 3 M3 200,000.00 200,000.00 200,000.00 M³ Nanga Nae

17 Timbunan Sirtu Kali 300,000.00 / Ret 3 M3 100,000.00 100,000.00 100,000.00 M³ L. Bajo

18 Tanah Urug (Cadas) 150,000.00 / Ret 3 M3 50,000.00 50,000.00 50,000.00 M³ L. Bajo

19 Ijuk 30,000.00 / Kg 1 Kg 30,000.00 30,000.00 30,000.00 Kg L. Bajo

20 Tali Ijuk 10,000.00 / Kg 1 Kg 10,000.00 10,000.00 10,000.00 Kg L. Bajo

21 Air Kerja 60.00 / Liter 1 Liter 60.00 60.00 60.00 Liter L. Bajo

22 Bata Merah 1,100.00 / Bh 1 Bh 1,100.00 1,100.00 1,100.00 Bh L. Bajo

23 Bataco Uk. 12 x 15 x 25 cm 3,000.00 / Bh 1 Bh 3,000.00 3,000.00 3,000.00 Bh L. Bajo

24 Stone Block/Paving Block tebal 8 cm 120,000.00 / m2 1 m2 120,000.00 120,000.00 120,000.00 M² L. Bajo

25 Roster uk. 20 x 20 x 8 cm 20,000.00 / Bh 1 Bh 20,000.00 20,000.00 20,000.00 Btg L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
LANGSUNG

DEPO BANGUNAN

MAXIMUM
CV. GLASSINDO
SATUAN

SMS/WA/TELP /

BAJO GYPSUM
EKA MANDIRI
PENDEKATAN

BANGUNAN
LANGSUNG

ANUGRAH
BINTANG

PERKASA
NO MATERIAL/BAHAN

LOGAM
Data Via
II BAHAN NON LOKAL

A Aluminium dan Besi

Aluminium Composit Panel ( ACP ) Cutting Laser


1 / Lbr 1 Lbr - 850,000.00 850,000.00 850,000.00 Lbr L. Bajo
Sparkling tebal 4 mm setara

Alumanium Foil/Sisalation Double Side bahan dasar


2 / Roll @ 50 M50 M' - 750,000.00 420,000.00 15,000.00 15,000.00 M' L. Bajo
plastik

3 Metal Cutting Laser tebal 3 mm setara / M2 - 1,300,000.00 1,300,000.00 1,300,000.00 M² L. Bajo

4 Pintu, Jendela dan Boven Aluminium / M' 1 M' - 1,800,000.00 1,800,000.00 1,800,000.00 M' L. Bajo

5 Huruf timbul Acrylic t=5mm / Cm 20,000.00 20,000.00 20,000.00 Cm L. Bajo

6 Kosen Aluminium Alexindo 4 inch Coating 5/10 '' / Btg 6 M' - 450,000.00 450,000.00 450,000.00 M' L. Bajo

Roof Bottom/Bottom Cord Bracing /Reng 33 - 0.45


7 / Btg 6 M' - 8,333.33 8,333.33 8,333.33 8,333.00 M' L. Bajo
Klas A

8 Baja Ringan / Main truss C - 75 - 75 Klas A / Btg 6 M' - 20,833.33 19,166.67 20,833.33 20,833.33 20,833.00 M' L. Bajo

9 Alluminium strip lebar 8 cm / M' 1 M' - 47,500.00 47,500.00 47,500.00 M' L. Bajo

10 List Plafon Shadowline/Tali air / Btg 3 M' - 25,000.00 15,000.00 8,333.33 8,333.00 M' L. Bajo

11 C Stud Metal / Btg 3 M - 18,333.33 18,333.33 18,333.00 M L. Bajo

12 U Channel (Uranner) / Btg 3 M - 15,000.00 15,000.00 15,000.00 M L. Bajo

13 Conctrete Bracket/ Angle Clip / Bh 1 Bh - - - Bh L. Bajo

14 List/Profil Kaca Elaxindo Warna / Btg 6 M' - 310,000.00 310,000.00 310,000.00 M' L. Bajo

15 Frame Alumunium Alexindo 30/70 -100 MM / Btg 6 M' - 27,500.00 27,500.00 27,500.00 M' L. Bajo

16 Rangka metal stud (MS 100) uk.100 x 34 mm / Btg 6 M' - - - M' L. Bajo

17 Rangka U runner (U 100) uk.100 x 30 mm / Btg 6 M' - - - M' L. Bajo

18 Kawat Beton/ikat / Kg 1 Kg - 25,000.00 25,000.00 20,000.00 25,000.00 25,000.00 Kg L. Bajo

19 Kawat Las RB 26 / Kg 5 Kg - 233,000.00 225,000.00 237,500.00 175,000.00 47,500.00 47,500.00 Kg L. Bajo

20 (Wiremesh) M6 x 2.1M x 5.4M (SNI-SERTIF) / Lbr 35 Kg - 500,000.00 485,000.00 14,384.35 14,384.00 Lbr L. Bajo
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
21 (Wiremesh) M8 x 2.1M x 5.4M (SNI-SERTIF) / Lbr 62 Kg - 950,000.00 950,000.00 870,000.00 15,374.66 15,375.00 Lbr L. Bajo

22 (Wiremesh) M10 x 2.1M x 5.4M (SNI-SERTIF) / Lbr 97 Kg - - - Lbr L. Bajo

Jaring kawat baja dilas Standart SNI Uk.2,1 m x 5,4 m


23 / Lbr 97 Kg - - - Kg L. Bajo
M Ø 10 mm

24 Kawat Jaring Galvanis / Lbr - - - M² L. Bajo

Pengadaan dan Pemasangan Rilling Tangga besi


25 / M2 1 M2 - 700,000.00 700,000.00 700,000.00 M² L. Bajo
hollow + Plat besi 2 mm

26 Hollow Besi 40x40 210,000.00 / Btg 210,000.00 185,000.00 160,000.00 135,000.00 210,000.00 210,000.00 Btg L. Bajo

27 Hollow Besi 20/40 / Btg - 140,000.00 130,000.00 95,000.00 140,000.00 140,000.00 Btg L. Bajo

28 Hollow Besi 50x50x2 mm / Btg - 385,000.00 350,000.00 215,000.00 385,000.00 385,000.00 Btg L. Bajo

29 Hollow Besi 40x60x2 mm / Btg 18 Kg - 15,101.59 14,277.87 19,220.21 19,220.21 19,220.00 Kg L. Bajo

30 Pipa Galvanis 1/2 Dim / Btg - 250,000.00 230,000.00 185,000.00 250,000.00 250,000.00 Btg L. Bajo

31 Hollow 50x10 650,000.00 / Btg 650,000.00 650,000.00 650,000.00 Btg L. Bajo

32 Hollow 35.35. 2 mm Zincoromate / Btg 6 M' - 46,000.00 40,000.00 34,000.00 7,666.67 7,667.00 M' L. Bajo

33 Hollow 15 . 35 . 2 mm Zincoromate / Btg 6 M' - 26,000.00 30,000.00 26,000.00 5,000.00 5,000.00 M' L. Bajo

34 Hollow 35.35. 2 mm Galvanum / Btg 6 M' - M' L. Bajo

35 Hollow 15 . 35 . 2 mm Galvanum / Btg 6 M' - M' L. Bajo

36 Hollow Galvalum 40x40 / Btg - 280,000.00 280,000.00 280,000.00 Btg L. Bajo

37 Hollow Galvalum 20/40 / Btg - 175,000.00 175,000.00 175,000.00 Btg L. Bajo

38 Besi Ulir Ø 19 mm; P= 12 M 360,000.00 / Btg 27 Kg 360,000.00 13,479.72 13,480.00 Kg L. Bajo

39 Besi Ulir Ø 16 mm; P= 12 M 265,000.00 / Btg 19 Kg 265,000.00 250,000.00 245,000.00 236,000.00 13,992.38 13,992.00 Kg L. Bajo

40 Besi Ulir Ø 13 mm; P= 12 M / Btg 13 Kg - 165,000.00 185,000.00 154,000.00 14,796.90 14,797.00 Kg L. Bajo

41 Besi Polos Ø 12 mm; P 12 M / Btg 11 Kg - 125,000.00 140,000.00 125,000.00 129,000.00 13,141.69 13,142.00 Kg L. Bajo

42 Besi Polos Ø 10 mm; P = 12 M / Btg 7 Kg - 90,000.00 100,000.00 88,000.00 89,000.00 13,517.17 13,517.00 Kg L. Bajo

43 Besi polos Ø 8 mm; P=12 M / Btg 5 Kg - 60,000.00 80,000.00 58,000.00 57,000.00 16,896.46 16,896.00 Kg L. Bajo

44 Pipa Hawa ( P=1.00 M ) GIP 1.5" + Complit 250,000.00 / Btg 250,000.00 38,000.00 40,000.00 38,000.00 33,000.00 250,000.00 250,000.00 Kg L. Bajo

B Pengisi Lantai dan Dinding

Bata Ringan AAC (Autoclaved Aerated Concrete) uk.


1 1,200,000.00 / M3 1 M3 1,200,000.00 1,070,000.00 1,050,000.00 1,200,000.00 1,200,000.00 M³ L. Bajo
60 x 20 x 10 cm

2 Paving Block Hexagon Diameter 20 cm Tebal 8 cm / Bh - - - M² L. Bajo

3 Roster Beton 20x20 / Bh - - - Bh L. Bajo

4 Granitile 60x60 Polish 190,000.00 / Dos 3 Bh 190,000.00 165,000.00 195,000.00 65,000.00 65,000.00 Bh L. Bajo

5 Granitile 60x60 Unpolish 250,000.00 / Dos 3 Bh 250,000.00 83,333.33 83,333.00 Bh L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
6 Keramik 50x50 Unpolish / Dos - - - Dos L. Bajo

7 Keramik 60x60 Polish / Dos - 150,000.00 150,000.00 150,000.00 Dos L. Bajo

8 Keramik 60x60 Unpolish / Dos - - - Dos L. Bajo

9 Keramik 30x30 / Dos - 55,000.00 60,000.00 60,000.00 60,000.00 Dos L. Bajo

10 Keramik Ukuran 40 x 40 cm warna/motif / Dos 6 Bh - 75,000.00 75,000.00 75,000.00 75,000.00 Dos L. Bajo

11 Keramik ukuran 60 x 60 cm Warna/motif / Dos 3 Bh - 150,000.00 150,000.00 150,000.00 Dos L. Bajo

12 Keramik Anti Slip Ukuran 40 x 40 cm / Dos 6 Bh - 80,000.00 95,000.00 95,000.00 95,000.00 Dos L. Bajo

13 Keramik Anti Slip ukuran 60 x 60 cm / Dos 3 Bh - - - Dos L. Bajo

14 Keramik Ukuran 30 x 30 cm warna/motif / Dos 11 Bh - - - Bh L. Bajo

15 Plint Keramik 10x30 / Btg - - - Btg L. Bajo

16 Plint Keramik 10x40 / Btg - 15,000.00 15,000.00 15,000.00 Btg L. Bajo

17 Plint Keramik 10x50 / Btg - - - Btg L. Bajo

18 Plint Keramik 10x60 / Btg - 25,000.00 25,000.00 25,000.00 Btg L. Bajo

19 Granit 60 x 60 CM / Dos 3 Bh - - - Dos L. Bajo

20 Granit Anti Slip Ukuran 60 x 60 CM / Dos 3 Bh - - - Dos L. Bajo

21 Plint Granit Ukuran 10 x 60 cm Timbul Motif / Btg 1 Bh - 35,000.00 35,000.00 35,000.00 Btg L. Bajo

22 Vynil lantai , anti bacterial / M2 - - - L. Bajo

23 Rumput Jepang / M2 - 45,000.00 45,000.00 45,000.00 M² L. Bajo

24 Partisi Toilet Cubicle Phenolic+Aksesoris 2,500,000.00 / M2 2,500,000.00 2,500,000.00 2,500,000.00 M² L. Bajo

25 Karpet Karet Ramp Motif Koin Tebal 4 mm / Roll 30 M - 9,500,000.00 316,666.67 316,667.00 M L. Bajo

C Besi Baja

Besi Baja H Beam Panjang 12 meter

1 L 100x100x6x8 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

2 L 125x125x5x7 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

3 L 125x125x6.5×9 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

4 L 150x150x7x10 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

5 L 175x175x7x11 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

6 L 200x200x8x12 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

7 L 250x250x9x14 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

8 L 300x300x10x15 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

9 L 250x350x12x19 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

10 L 400x400x13x21 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
Besi Baja WF ( Wide Flange ) Panjang 12 meter - - L. Bajo

1 WF 100X50X5 X7 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

2 WF 125X60X6 X8 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

3 WF 148X100X6X9 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

4 WF 150X75X5X7 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

5 WF 175X90X5X8 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

6 WF 198X99X4,5X7 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

7 WF 200X100X3,2X4,5 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

8 WF 200X100X5,5X8 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

9 WF 248X124X5X8 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

10 WF 250X125X6X9 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

11 WF 298X149X6X8 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

12 WF 300X150X6,5X9 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

13 WF 346X174X6X9 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

14 WF 350X175X7X11 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

15 WF 396X199X7X11 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

16 WF 400X200X8 X13 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

17 WF 446X199X8X12 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

18 WF 450X200X9X14 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

19 WF 500X200X10X16 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

20 WF 588X300X10X16 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

21 WF 600X200X11X17 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

22 WF 700X300X13X24 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

23 WF 800X300X14X26 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

Besi Baja kanal C/ CNP Panjang 6 meter - -

1 L 60X30X10X1,6 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

2 L 75X35X15X1,6 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

3 L 75 X45X15X1,6 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

4 L 75X45X15X2,3 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

5 L 100X50X20X1,6 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
6 L 100X50X20X2,3 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

7 L 100X50X20X3,2 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

8 L 125X50X20X2,3 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

9 L 125X50X20X3,2 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

10 L 150X50X20X2,3 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

11 L 150X50X20X3,2 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

12 L 150X65X20X2,3 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

13 L 150X65X20X3,2 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

14 L 200X75X20X3,2 / Kg - 27,000.00 27,000.00 27,000.00 Kg L. Bajo

D Penutup Atap

1 Atap Bitumen gelombang Monolayer 3 mm Onduline / Lbr 1 Lbr - 190,000.00 190,000.00 190,000.00 Lbr L. Bajo

2 Nok / Ridge Onduline / Lbr 1 Lbr - 75,000.00 75,000.00 75,000.00 Lbr L. Bajo

3 Atap Spandek 0.3 / Lbr 1 Lbr - 240,000.00 270,000.00 390,000.00 390,000.00 390,000.00 Lbr L. Bajo

4 Atap Policarbonat 5 mm Twinlite 2,500,000.00 / Lbr 1 Lbr 2,500,000.00 2,500,000.00 2,500,000.00 Lbr L. Bajo

5 Profil Sambungan Policarbonat 5 mm 200,000.00 / Lbr 1 Lbr 200,000.00 200,000.00 200,000.00 Lbr L. Bajo

6 Nok Bubungan Spandek L=30 / Lbr 1 M' - 50,000.00 75,000.00 48,000.00 75,000.00 75,000.00 M' L. Bajo

7 Talang Jurai 0.4/3m / Lbr 4 M' - 60,000.00 60,000.00 60,000.00 M' L. Bajo

8 Atap Multiroof Berpasir 45,000.00 / Lbr 1 Lbr 45,000.00 42,000.00 45,000.00 45,000.00 Lbr L. Bajo

9 Jurai atap dan Nok Multiroof Berpasir 32,000.00 / Pcs 1 Pcs 32,000.00 30,000.00 32,000.00 32,000.00 Pcs L. Bajo

10 Wall Flashing ( rainbow roof ) / M' 1 M' - 35,000.00 50,000.00 50,000.00 50,000.00 M' L. Bajo

E Penutup Plafon

1 List PVC / Btg 1 Btg - 50,000.00 70,000.00 65,000.00 70,000.00 70,000.00 Btg L. Bajo

2 Plafon PVC 8 mm / Lbr 1 M' - 70,000.00 70,000.00 70,000.00 M' L. Bajo

3 List Gypsum / Btg 1 M' - 25,000.00 25,000.00 25,000.00 M' L. Bajo

4 Papan Kalsiplang Board tebal 9 MM / Lbr 3 M' - 65,000.00 55,000.00 21,666.67 21,667.00 M' L. Bajo

5 Papan GRC tebal 6 mm 120,000.00 / Lbr 0 40,800.00 18,700.00 34,000.00 39,100.00 40,800.00 40,800.00 M² L. Bajo

6 Papan GRC tebal 10 mm 260,000.00 / Lbr 0 88,400.00 39,100.00 51,000.00 88,400.00 88,400.00 M² L. Bajo

7 Gypsum Ex. Elephant tebal 9 MM / Lbr 1 - 95,000.00 75,000.00 65,000.00 95,000.00 95,000.00 Lbr L. Bajo

8 Kalsi Board tbl 6 mm / Lbr Lmbr - 70,000.00 110,000.00 110,000.00 110,000.00 Lbr L. Bajo
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
F Skrup & Paku

1 Paku rivet / Kotak 665 Bh - 187.97 413.53 338.35 181.95 413.53 414.00 Bh L. Bajo

2 Top Plat/Mur Plate / Bh 1 Bh - - - Bh L. Bajo

3 Speedy Screw / Bh 1 bh - 1,300.00 1,300.00 1,300.00 bh L. Bajo

4 Dinabolt/Ramset dia 12 x 120 mm Klas A 12,500.00 / Bh 1 Bh 12,500.00 6,000.00 8,000.00 5,000.00 12,500.00 12,500.00 Bh L. Bajo

5 Self drilling screw dia 6 x 20 mm ( truss screw ) Klas A / Dos 100 Bh - 30,000.00 175,000.00 1,750.00 1,750.00 Bh L. Bajo

Self drilling screw dia 4 x 16 mm ( Roof bottom ) Klas


6 / Dos 100 Bh - 28,000.00 280.00 280.00 Bh L. Bajo
A

7 Sekrup F i s e r 3" / Bh 1 Bh - 1,500.00 1,500.00 1,500.00 Bh L. Bajo

8 Skrup Fixer / Bh - 1,500.00 1,500.00 1,500.00 Bh L. Bajo

9 Screw 60.00 / Pcs 1 Pcs 60.00 60.00 60.00 Pcs L. Bajo

10 Ramset/Dinabolt / Bh 1 Bh - - - Bh L. Bajo

11 Skrup Metal 60,000.00 / Dos 1,000 Bh 60,000.00 60,000.00 60,000.00 Bh L. Bajo

12 Paku skrup Gypsum / Dos 1 Dos - 55,000.00 54,000.00 85,000.00 150,000.00 80,000.00 150,000.00 150,000.00 Dos L. Bajo

13 Paku skrup / Dos 500 Bh - 16,000.00 16,000.00 16,000.00 Bh L. Bajo

14 Paku Seng / Kg 1 Kg - 35,000.00 52,000.00 50,000.00 35,000.00 30,000.00 52,000.00 52,000.00 Kg L. Bajo

15 Paku Ukuran 1,5 cm / Kg 1 Kg - 25,000.00 25,000.00 25,000.00 Kg L. Bajo

16 Paku Ukuran 2 cm / Kg 1 Kg - 25,000.00 25,000.00 22,000.00 25,000.00 25,000.00 Kg L. Bajo

17 Paku Ukuran 2,5 cm / Kg 1 Kg - 20,000.00 20,000.00 20,000.00 Kg L. Bajo

18 Paku Ukuran 3 cm / Kg 1 Kg - 25,000.00 18,000.00 30,000.00 25,000.00 22,000.00 30,000.00 30,000.00 Kg L. Bajo

19 Paku Ukuran 5-12 cm / Kg 1 Kg - 20,000.00 22,000.00 20,000.00 20,000.00 22,000.00 22,000.00 Kg L. Bajo

G Cat

1 Sabun Besi / Bh 1 Bh - - - Bh L. Bajo

2 Soda Api / Ltr 1 Ltr - 35,000.00 20,000.00 30,000.00 35,000.00 35,000.00 Ltr L. Bajo

3 Cat Besi Delta / Kg 1 Kg - 95,000.00 95,000.00 95,000.00 Kg L. Bajo

4 Cat Kayu Mengkilat setara Emco Polibest / Kg 1 Kg - 55,000.00 72,000.00 85,000.00 85,000.00 85,000.00 Kg L. Bajo

5 Cat Tembok Jotun Interior setara 900,000.00 / Kaleng 18 Kg 50,000.00 50,000.00 50,000.00 Kg L. Bajo

6 Cat Tembok Jotun Exterior setara 2,100,000.00 / Kaleng 20 Kg 105,000.00 105,000.00 105,000.00 Kg L. Bajo

7 Cat Kayu ex. Emco / Kg 1 Kg - 84,000.00 72,000.00 80,000.00 84,000.00 84,000.00 Kg L. Bajo

8 Cat Tembok Paragon / Kg 20 Kg - 425,000.00 456,000.00 496,000.00 24,800.00 24,800.00 Kg L. Bajo

9 Cat Menie 65,000.00 / Kg 65,000.00 65,000.00 65,000.00 Kg L. Bajo

10 Dumpul/plamir Skim Coat 20 Kg/Big Lion / Kg 20 Kg - 110,000.00 80,000.00 5,500.00 5,500.00 Kg L. Bajo
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
11 Kwas 4 inch / Bh 1 Bh - 15,000.00 40,000.00 25,000.00 15,000.00 20,000.00 40,000.00 40,000.00 Bh L. Bajo

12 Lem Kayu Aibon / Kg 1 Kg - 100,000.00 80,000.00 73,000.00 100,000.00 100,000.00 Kg L. Bajo

13 Minyak Cat/ Thiner Spesial Avian / Kg 1 Kg - 28,000.00 35,000.00 65,000.00 65,000.00 65,000.00 Kg L. Bajo

14 Water Proof/ Aquaproof / Kg 4 Kg - 50,000.00 53,000.00 53,000.00 53,000.00 Kg L. Bajo

15 Wood Filler / Kg 1 Kg - 50,000.00 49,000.00 55,000.00 48,000.00 55,000.00 55,000.00 Kg L. Bajo

16 Kuas Roll / Bh 1 Bh - 20,000.00 50,000.00 25,000.00 25,000.00 50,000.00 50,000.00 Bh L. Bajo

H Pintu Jendela dan Aksesoris

1 Gerendel Kuping Jendela / set 1 Bh - 45,000.00 8,000.00 41,000.00 45,000.00 45,000.00 set L. Bajo

2 Engsel Pintu 4" Paori / set - 40,000.00 20,000.00 31,000.00 45,000.00 38,000.00 45,000.00 45,000.00 set L. Bajo

3 Door Closer / Bh - 400,000.00 250,000.00 352,000.00 350,000.00 400,000.00 400,000.00 Bh L. Bajo

4 Lockcase / bh - 350,000.00 70,400.00 120,000.00 350,000.00 350,000.00 Bh L. Bajo

5 Clinder Look / bh - 150,000.00 93,000.00 150,000.00 150,000.00 Bh L. Bajo

6 Handle on Roses (HRE) / set - 150,000.00 130,000.00 150,000.00 150,000.00 set L. Bajo

7 Handle Sliding / set - 200,000.00 40,000.00 45,000.00 200,000.00 200,000.00 set L. Bajo

8 Pull Handle 60 Cm 215,000.00 / set 215,000.00 300,000.00 783,000.00 783,000.00 783,000.00 set L. Bajo

9 Grendel Biasa / bh - 20,000.00 10,000.00 24,000.00 12,000.00 24,000.00 24,000.00 bh L. Bajo

10 Casement / set - 70,000.00 59,000.00 70,000.00 70,000.00 set L. Bajo

11 Floor hinges mutu tinggi 1,250,000.00 / Psg 1,250,000.00 1,250,000.00 1,250,000.00 Psg L. Bajo

12 patch Fitting ambang Bawah 300,000.00 / Psg 300,000.00 300,000.00 300,000.00 Psg L. Bajo

13 patch Fitting ambang Atas 300,000.00 / Psg 300,000.00 300,000.00 300,000.00 Psg L. Bajo

14 Kosen Aluminium (berwarna/anodized) 4' 245,000.00 / M' 245,000.00 245,000.00 245,000.00 M' L. Bajo

15 Pintu Swing (Inc. Kusen, Daun Pintu Dan Aks.) 450,000.00 / M' 450,000.00 450,000.00 450,000.00 M' L. Bajo

Jendela Swing UPVC (Incl. Kusen, Daun Jendela Dan


16 380,000.00 / M' 380,000.00 380,000.00 380,000.00 M' L. Bajo
Aks.)

Jendela Sliding UPVC (Incl. Kusen, Daun Jendela Dan


17 340,000.00 / M' 340,000.00 340,000.00 340,000.00 M' L. Bajo
Aks.)

Jendela Kaca Mati UPVC (Incl. Kusen, Daun Jendela


18 310,000.00 / M' 310,000.00 310,000.00 310,000.00 M' L. Bajo
Dan Aks.)

19 Daun Pintu Alumunium Jalusi Kamar mandi 833,000.00 / M2 833,000.00 833,000.00 833,000.00 M2 L. Bajo

20 Braket Acp 5,000.00 / 5,000.00 5,000.00 5,000.00 Bh L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
21 Handle Jendela Alumunium / bh - 30,000.00 17,000.00 30,000.00 30,000.00 bh L. Bajo

22 Flush Handle Stainless Stell / bh - 250,000.00 250,000.00 250,000.00 bh L. Bajo

23 Taco TH 325-Brown Kraftwood 185,000.00 / Lbr 0 62,147.27 62,147.27 62,147.27 62,147.00 M² L. Bajo

24 Gerendel Pintu / Bh 1 Bh - 40,000.00 12,000.00 18,000.00 20,000.00 40,000.00 40,000.00 Bh L. Bajo

25 Kunci Tanam ex. Paori / Bh 1 Bh - 350,000.00 100,000.00 350,000.00 350,000.00 Bh L. Bajo

26 Hengsel Pintu 4 " Paori / Bh 1 Bh - 50,000.00 20,000.00 69,000.00 25,000.00 45,000.00 38,000.00 69,000.00 69,000.00 Bh L. Bajo

27 Hengsel Jendela 3" Paori / Bh 1 Bh - 60,000.00 15,000.00 64,000.00 20,000.00 35,000.00 30,000.00 64,000.00 64,000.00 Bh L. Bajo

28 Handle Pintu / Set 1 Set - 250,000.00 450,000.00 278,000.00 200,000.00 100,000.00 450,000.00 450,000.00 Set L. Bajo

29 Kait Angin / Bh 1 Bh - 30,000.00 12,000.00 57,000.00 20,000.00 15,000.00 13,000.00 57,000.00 57,000.00 Bh L. Bajo

30 Door Closer / Set 1 Set - 400,000.00 331,000.00 350,000.00 400,000.00 400,000.00 Set L. Bajo

31 Floor hinges ; Kualitas Baik ( No. 1) / Set 1 Set - 1,800,000.00 1,800,000.00 1,800,000.00 Set L. Bajo

32 Overpanel ; Kualitas Baik ( No. 1) / Set 1 Set - 2,000,000.00 2,000,000.00 2,000,000.00 Set L. Bajo

I Kaca

1 Kaca Tempered tebal 12 mm / M² 1 M² - 1,600,000.00 1,600,000.00 1,600,000.00 M² L. Bajo

2 Kaca Tempered tebal 10 mm / M² 1 M² - 1,400,000.00 1,400,000.00 1,400,000.00 M² L. Bajo

3 Kaca Tempered tebal 8 mm / M² 1 M² - 1,200,000.00 1,200,000.00 1,200,000.00 M² L. Bajo

4 Kaca Panasap Glass 5 mm / M² 1 M² - 300,000.00 300,000.00 300,000.00 M² L. Bajo

5 Kaca Polos tebal 6 mm (clear) 290,000.00 / M² 1 M² 290,000.00 290,000.00 290,000.00 M² L. Bajo

6 Kaca Polos tebal 8 mm (clear) 320,000.00 / M² 1 M² 320,000.00 320,000.00 320,000.00 M² L. Bajo

7 Kaca tebal 8 mm (Dark Blue) 345,000.00 / M² 1 M² 345,000.00 345,000.00 345,000.00 M² L. Bajo

8 Kaca tebal 6 mm (Dark Blue) 320,000.00 / M² 1 M² 320,000.00 320,000.00 320,000.00 M² L. Bajo

9 Kopling Besar 310,000.00 / M 1 M 310,000.00 310,000.00 310,000.00 M L. Bajo

10 Silikon/sealant / Bh 1 Bh - 80,000.00 65,000.00 40,000.00 80,000.00 80,000.00 Bh L. Bajo

J Semen

1 Semen Portland (40 Kg) 55,000.00 / Zak 1 Zak 55,000.00 53,000.00 55,000.00 55,000.00 Zak L. Bajo

2 Semen warna / Kg 1 Kg - 15,000.00 15,000.00 15,000.00 15,000.00 Kg L. Bajo

3 Semen MU 301 130,000.00 / Zak 40 Kg 3,250.00 2,500.00 3,250.00 3,250.00 Kg L. Bajo

4 Semen MU 270 (Untuk acian ) 180,000.00 / Zak 25 Kg 7,200.00 6,800.00 5,200.00 7,200.00 7,200.00 Kg L. Bajo

5 Semen MU 380 ( Untuk Perekat Bata ) / Zak 1 Zak - 120,000.00 120,000.00 120,000.00 120,000.00 Kg L. Bajo
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
6 Sika Waterproofing / Kg - - - L. Bajo

7 Politur Jadi K Indian / Ltr 1 Ltr - 75,000.00 75,000.00 75,000.00 75,000.00 Ltr L. Bajo

8 Cornice/Compound / Zak 1 Zak - 85,000.00 85,000.00 78,000.00 85,000.00 85,000.00 Zak L. Bajo

9 Amplas/Kertas Pasir / M 1 M - 10,000.00 5,000.00 10,000.00 10,000.00 10,000.00 Lbr L. Bajo

10 Jointing Coumpound 15,000.00 / Kg 1 Kg 15,000.00 15,000.00 15,000.00 Kg L. Bajo

11 Joint Tape 3,500.00 / M 1 M 3,500.00 3,500.00 3,500.00 M L. Bajo

12 Lem Raja wali / Kg 1 Kg - 23,000.00 23,000.00 25,000.00 22,000.00 25,000.00 25,000.00 Kg L. Bajo

13 Alat bantu ( Mesin Bor Listrik) Genset / Jam 1 Jam - - - Jam L. Bajo

14 Alat Sambung / Bh 1 Bh - - - Bh L. Bajo

15 Multipleks 9 mm / Lbr 1 Lbr - 150,000.00 120,000.00 13,000.00 135,000.00 150,000.00 150,000.00 Lbr L. Bajo

16 Plywood tebal 9 mm / Lbr 1 Lbr - 160,000.00 75,000.00 160,000.00 160,000.00 Lbr L. Bajo

17 Tripleks 5 mm / Lbr 1 Lbr - 95,000.00 70,000.00 85,000.00 75,000.00 85,000.00 95,000.00 95,000.00 Lbr L. Bajo

18 Calsium / Zak 40 Kg - 90,000.00 55,000.00 80,000.00 90,000.00 90,000.00 Kg L. Bajo

19 Cornice/Compound / Zak 40 Kg - 75,000.00 85,000.00 85,000.00 85,000.00 Kg L. Bajo

20 Colton Plaster / Bh 1 Bh - 90,000.00 90,000.00 90,000.00 Bh L. Bajo

21 Tepung Gypsum / Kg 1 Kg - 15,000.00 2,750.00 70,000.00 70,000.00 70,000.00 Kg L. Bajo

K Sanitair

1 Kloset Jongkok INA / Bh 1 Bh - 330,000.00 240,000.00 250,000.00 330,000.00 330,000.00 Bh L. Bajo

Pas Kloset Duduk American Standart complit Midle


2 2,650,000.00 / Bh 1 Bh 2,650,000.00 2,500,000.00 2,140,000.00 2,500,000.00 2,100,000.00 2,650,000.00 2,650,000.00 Bh L. Bajo
Sofer + Tabung

3 Kloset Duduk Tanpa Tabung INA / Bh 1 Bh - 500,000.00 565,000.00 750,000.00 450,000.00 750,000.00 750,000.00 Bh L. Bajo

4 Anodised Aluminium U/F Channel 12 mm 250,000.00 / 6 M 41,666.67 41,666.67 41,667.00 M L. Bajo

5 Aluminium Top Rail 550,000.00 / 6 M 91,666.67 91,666.67 91,667.00 M L. Bajo

6 Coat Hook 15,000.00 / Bh 15,000.00 15,000.00 15,000.00 Bh L. Bajo

7 Door Knob 65,000.00 / Bh 65,000.00 65,000.00 65,000.00 Bh L. Bajo

8 Thumb-Turn & Indikator 95,000.00 / Bh 95,000.00 95,000.00 95,000.00 Bh L. Bajo

9 Gravity Hinge 80,000.00 / Psg 80,000.00 80,000.00 80,000.00 Psg L. Bajo

10 Bottom Pedestal 120,000.00 / Bh 120,000.00 120,000.00 120,000.00 Bh L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
11 Polyamide Top Rail End Cap 15,000.00 / Bh 1 Bh 15,000.00 15,000.00 15,000.00 Bh L. Bajo

12 Aluminium Door Stopper Channel 150,000.00 / 6 M 25,000.00 25,000.00 25,000.00 M L. Bajo

13 GRC Board 12 mm 310,000.00 / Lbr 310,000.00 310,000.00 310,000.00 Lbr L. Bajo

14 Water Heater 15 Liter / Bh 1 Bh - 1,350,000.00 2,615,000.00 2,615,000.00 2,615,000.00 Bh L. Bajo

15 Shower + Kran air Double Pipe / Bh 1 Bh - 2,321,000.00 2,321,000.00 2,321,000.00 Bh L. Bajo

16 Wastafel Lengkap Asesories Amerikan standart 1,200,000.00 / Bh 1 Bh 1,200,000.00 400,000.00 890,000.00 1,200,000.00 1,200,000.00 Bh L. Bajo

17 Urinoir American Standar / Bh 1 Bh - 1,850,000.00 1,850,000.00 1,850,000.00 Bh L. Bajo

18 Dispenser sabun manual/Hand Soap Oil / Bh 1 Bh - 53,000.00 53,000.00 53,000.00 Bh L. Bajo

19 Kotak Tisu / Bh 1 Bh - 158,000.00 158,000.00 158,000.00 Bh L. Bajo

20 Hanger Besi Stenliss / Bh 1 Bh - - - Bh L. Bajo

21 Sofer / Bh 1 Bh - - - Bh L. Bajo

22 Floor Draine / Bh 1 Bh - 40,000.00 65,000.00 65,000.00 65,000.00 Bh L. Bajo

23 Stop kran Ø 1" 135,000.00 / Bh 1 Bh 135,000.00 135,000.00 135,000.00 Bh L. Bajo

24 Stop Kran Air Biasa PVC Ø 1/2" / Bh 1 Bh - 15,000.00 20,000.00 13,000.00 20,000.00 20,000.00 Bh L. Bajo

25 Handrail Paloma BAP 1524 Corina BTH GRB = 50CM / unit 1 unit - 450,000.00 450,000.00 450,000.00 unit L. Bajo

26 Pipa Hawa ( P=1.00 M ) GIP 1.5" + Complit / Bh 1 Bh - - - Bh L. Bajo

27 Pipa PVC AW ø 1/2" / Btg (P=4 M ) 4 M' - 25,000.00 30,000.00 35,000.00 30,000.00 31,000.00 8,750.00 8,750.00 M' L. Bajo

28 Pipa PVC AW ø 3/4" / Btg (P=4 M ) 4 M' - 30,000.00 41,000.00 45,000.00 40,000.00 42,000.00 11,250.00 11,250.00 M' L. Bajo

29 Pipa PVC AW ø 1" / Btg (P=4 M ) 4 M' - 40,000.00 56,000.00 65,000.00 45,000.00 57,000.00 16,250.00 16,250.00 M' L. Bajo

30 Pipa PVC AW ø 1 1/2" / Btg (P=4 M ) 4 M' - 70,000.00 63,000.00 110,000.00 120,000.00 97,000.00 30,000.00 30,000.00 M' L. Bajo

31 Pipa PVC AW ø 4" / Btg (P=4 M ) 4 M' - 270,000.00 227,000.00 420,000.00 275,000.00 430,000.00 107,500.00 107,500.00 M' L. Bajo

32 Pipa PVC AW ø 2 " 150,000.00 / Btg (P=4 M ) 4 M' 150,000.00 90,000.00 80,000.00 140,000.00 95,000.00 125,000.00 37,500.00 37,500.00 M' L. Bajo

33 Pipa PVC AW ø 3 " / Btg (P=4 M ) 4 M' - 180,000.00 144,000.00 250,000.00 185,000.00 258,000.00 64,500.00 64,500.00 M' L. Bajo

34 Isolasi Pipa/Sealtape / Bh 1 Bh - 6,000.00 4,000.00 10,000.00 7,000.00 3,000.00 10,000.00 10,000.00 Bh L. Bajo

35 Clean Out Ø 3" (Stainless stell) 176,800.00 / Bh 1 Bh 176,800.00 176,800.00 176,800.00 Bh L. Bajo

L Mekanikal Elektrikal

1 Tee dos ( Listrik ) / Bh 1 Bh - 5,000.00 5,000.00 5,000.00 3,000.00 4,000.00 5,000.00 5,000.00 Bh L. Bajo

2 Biaya Penyambungan Daya Listrik 23000 Watt / Watt 1 Watt - - - Watt L. Bajo

3 Top patch fitting ; Kualitas Baik ( No. 1) Broco / Set 1 Set - 13,000.00 23,000.00 23,000.00 23,000.00 Set L. Bajo

4 Bottom patch fitting ; Kualitas Baik ( No. 1) / Set 1 Set - - - Set L. Bajo

5 Bottom patch lock + cylinder ; Kualitas Baik ( No. 1) / Set 1 Set - - - Set L. Bajo
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
6 Pull handle ; Kualitas Baik ( No. 1) / Set 1 Set - - - Set L. Bajo

Kabel Listrik NYM 3 x 2.5 mm ( Standart PLN )


7 / Roll @ 50 M 50 M' - 800,000.00 1,100,000.00 785,000.00 820,000.00 22,000.00 22,000.00 M' L. Bajo
Eterna

Kabel Listrik NYM 2 x 2.5 mm ( Standart PLN )


8 / Roll @ 50 M 50 M' - 650,000.00 850,000.00 685,000.00 650,000.00 17,000.00 17,000.00 M' L. Bajo
Eterna

9 Pipa Listrik 5/8 " / Btg 1 Btg - 8,000.00 8,000.00 13,000.00 12,000.00 11,000.00 13,000.00 13,000.00 Btg L. Bajo

10 Saklar Tunggal Bronco Super / Bh 1 Bh - 15,000.00 40,000.00 20,000.00 23,000.00 16,000.00 40,000.00 40,000.00 Bh L. Bajo

11 Saklar Ganda Bronco Super / Bh 1 Bh - 20,000.00 46,000.00 25,000.00 25,000.00 20,000.00 46,000.00 46,000.00 Bh L. Bajo

12 Stop Contak Bronco Super / Bh 1 Bh - 18,000.00 34,000.00 20,000.00 25,000.00 17,000.00 34,000.00 34,000.00 Bh L. Bajo

13 Fitting Tanam (Brocco/stara ) / Bh 1 Bh - 15,000.00 20,000.00 20,000.00 20,000.00 Bh L. Bajo

14 Lampu Downlight 18 Watt / Bh 1 Bh - 65,000.00 131,000.00 131,000.00 131,000.00 Bh L. Bajo

15 Lampu Philips Spiral 20 Watt / Bh 1 Bh - 56,000.00 65,000.00 63,000.00 65,000.00 65,000.00 Bh L. Bajo

16 Fitting Tempel ( Broco /Stara ) / Bh 1 Bh - 20,000.00 13,000.00 20,000.00 20,000.00 Bh L. Bajo

17 MCB Group 16 A ex Broco / Bh 1 Bh - 50,000.00 42,000.00 50,000.00 50,000.00 Bh L. Bajo

18 MCB Group 6 A ex Broco / Bh 1 Bh - 50,000.00 65,000.00 42,000.00 65,000.00 65,000.00 Bh L. Bajo

19 Panel Box Control Server uk. 40x50x20 cm / Unit 1 Unit - 600,000.00 600,000.00 600,000.00 Unit L. Bajo

20 Panel Box Control Server uk. 20x30x12 cm / Bh 1 Bh - 240,000.00 240,000.00 240,000.00 Bh L. Bajo

21 Lampu panel box control server / Bh 1 Bh - - - Bh L. Bajo

22 Plat rell MCB Box Control / Bh 1 Bh - - - Bh L. Bajo

23 Panel Box 4 MCB / Bh 1 Bh - - - Bh L. Bajo

24 Lampu Emergency Nicad Batteray 20 Watt / Bh 1 Bh - - - Bh L. Bajo

Lampu RM Artolite Passat CL 2x18 watt M5 White;


25 / Bh 1 Bh - - - Bh L. Bajo
Out Bow

26 L Bow Ø 5/8" / Bh 1 Bh - 2,000.00 500.00 2,000.00 1,000.00 2,000.00 2,000.00 Bh L. Bajo

27 Klem pipa Listrik Ø 5/8" / Bh 1 Bh - 2,000.00 500.00 2,000.00 500.00 2,000.00 2,000.00 Bh L. Bajo

28 Fhiser / Bh 1 Bh - 1,500.00 1,500.00 1,500.00 1,500.00 Bh L. Bajo

29 Las Dop Listrik / Bh 1 Bh - 1,500.00 1,000.00 1,500.00 1,500.00 Bh L. Bajo

30 Mata tombak EF, / Bh 1 Bh - - - Bh L. Bajo

31 pipa PVC AW Ø 1" / Btg 4 M' - 65,000.00 16,250.00 16,250.00 M' L. Bajo

32 Kabel BC 10 mm, dengan Pipa Konduit / M' 1 M' - - - M' L. Bajo

33 Grounding didalam arde / Unit 1 Unit - - - Unit L. Bajo

34 Kotak teks dan acceroies / Bh 1 Bh - - - Bh L. Bajo

35 AC Panasonic 2 1/2 PK / Bh 1 Bh - - - Bh L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
36 AC Panasonic 2 PK / Bh 1 Bh - - - Bh L. Bajo

37 AC Panasonic 1 1/2 PK / Bh 1 Bh - - - Bh L. Bajo

38 AC Panasonic 1 PK / Bh 1 Bh - - - Bh L. Bajo

39 AC Panasonic 3/4 PK / Bh 1 Bh - - - Bh L. Bajo

40 AC Panasonic 1/2 PK / Bh 1 Bh - - - Bh L. Bajo

41 Gas Refrigerent ( Fereon AC ) R22/R407 / Kg 1 Kg - - - Kg L. Bajo

42 Dudukan Unit outdoor, bracket, Penggantung dll / Set 1 Set - - - Set L. Bajo

43 Sewa alat-alat bantu, steger kerja, Pengukuran dll / Ls 1 Ls - - - Ls L. Bajo

Pemasangan Pipa Refrigerant, (in-out), Pipa Drain AC


44 / Unit 1 Unit - - - Unit L. Bajo
PVC AW, Isolasi Poliurethane

45 Handle Jendela / Bh 1 Bh - 42,000.00 42,000.00 42,000.00 Bh L. Bajo

46 Bak Cuci Satinless Steel / Bh 1 Bh - 480,000.00 480,000.00 480,000.00 Bh L. Bajo

47 Bidet /Sofer + Selang Move / Set 1 Set - 115,000.00 115,000.00 115,000.00 Set L. Bajo

48 Profil Tank Pinguin 2000 Liter Stainless 6,500,000.00 / Bh 1 Bh 6,500,000.00 6,500,000.00 6,500,000.00 Bh L. Bajo

49 Sanyo Sumur Dangkal ( Automatic ) / Bh 1 Bh - 750,000.00 750,000.00 750,000.00 Bh L. Bajo

50 Water Booster / Bh 1 Bh - - - Bh L. Bajo

51 Grease Trap Stainless / Bh 1 Bh - - - Bh L. Bajo

PEKERJAAN PENARIKAN KABEL -

KABEL FEEDER -

1 Kabel FRC 4 x 10 mm2 356,000.00 / M 356,000.00 356,000.00 356,000.00 M L. Bajo

2 Kabel FRC 4 x 150 mm2 3,605,000.00 / M 3,605,000.00 3,605,000.00 3,605,000.00 M L. Bajo

3 Kabel FRC 4 x 70 mm2 1,760,000.00 / M 1,760,000.00 1,760,000.00 1,760,000.00 M L. Bajo

4 Kabel FRC 4 x 4 mm2 185,000.00 / M 185,000.00 185,000.00 185,000.00 M L. Bajo

5 Kabel FRC 4 x 16 mm2 504,000.00 / M 504,000.00 504,000.00 504,000.00 M L. Bajo

6 Kabel NYFGbY 4 x 240 mm2 1,817,000.00 / M 1,817,000.00 1,817,000.00 1,817,000.00 M L. Bajo

7 Kabel NYY 4 x 240 mm2 1,779,000.00 / M 1,779,000.00 1,779,000.00 1,779,000.00 M L. Bajo

8 Kabel NYFGbY 4 x 70 mm2 533,500.00 / M 533,500.00 533,500.00 533,500.00 M L. Bajo

9 Kabel NYFGbY 4 x 35 mm2 289,000.00 / M 289,000.00 289,000.00 289,000.00 M L. Bajo

10 Kabel NYFGbY 4 x 25 mm2 225,000.00 / M 225,000.00 225,000.00 225,000.00 M L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
11 Kabel NYFGbY 4 x 16 mm2 144,500.00 / M 144,500.00 144,500.00 144,500.00 M L. Bajo

12 Kabel NYFGbY 4 x 10 mm2 123,600.00 / M 123,600.00 123,600.00 123,600.00 M L. Bajo

13 Kabel NYFGbY 4 x 6 mm2 86,200.00 / M 86,200.00 86,200.00 86,200.00 M L. Bajo

14 Kabel NYFGbY 4 x 4 mm2 66,100.00 / M 66,100.00 66,100.00 66,100.00 M L. Bajo

15 Kabel NYY 4 x 95 mm2 698,500.00 / M 698,500.00 698,500.00 698,500.00 M L. Bajo

16 Kabel NYY 4 x 50 mm2 357,500.00 / M 357,500.00 357,500.00 357,500.00 M L. Bajo

17 Kabel FRC 4 x 50 mm2 1,280,000.00 / M 1,280,000.00 1,280,000.00 1,280,000.00 M L. Bajo

18 Kabel NYY 4 x 35 mm2 269,000.00 / M 269,000.00 269,000.00 269,000.00 M L. Bajo

19 Kabel NYY 4 x 25 mm3 197,500.00 / M 197,500.00 197,500.00 197,500.00 M L. Bajo

20 Kabel NYY 4 x 16 mm2 128,000.00 / M 128,000.00 128,000.00 128,000.00 M L. Bajo

21 Kabel NYY 4 x 10 mm2 93,800.00 / M 93,800.00 93,800.00 93,800.00 M L. Bajo

22 Kabel NYY 4 x 6 mm2 58,500.00 / M 58,500.00 58,500.00 58,500.00 M L. Bajo

23 Kabel NYY 4 x 4 mm2 42,000.00 / M 42,000.00 42,000.00 42,000.00 M L. Bajo

KABEL INSTALASI

1 Kabel NYFGbY 2 x 2.5 mm2 33,100.00 / M 33,100.00 33,100.00 33,100.00 M L. Bajo

2 Kabel NYFGbY 3 x 2,5 mm3 38,800.00 / M 38,800.00 38,800.00 38,800.00 M L. Bajo

3 Kabel NYFGbY 2 x 6 mm4 53,200.00 / M 53,200.00 53,200.00 53,200.00 M L. Bajo

4 Kabel NYA 2 x 2.5 mm2 10,200.00 / M 10,200.00 10,200.00 10,200.00 M L. Bajo

5 Kabel NYA 3 x 2.5 mm2 15,300.00 / M 15,300.00 15,300.00 15,300.00 M L. Bajo

6 Kabel NYA 70 mm2 81,000.00 / M 81,000.00 81,000.00 81,000.00 M L. Bajo

7 Kabel NYY 3 x 2,5 mm2 38,800.00 / M 38,800.00 38,800.00 38,800.00 M L. Bajo

8 Kabel NYY 3 x 4 mm2 53,200.00 / M 53,200.00 53,200.00 53,200.00 M L. Bajo

9 Kabel NYM 3 x 2,5 mm2 16,000.00 / M 16,000.00 16,000.00 16,000.00 M L. Bajo

10 Kabel NYM 2 x 2,5 mm3 13,000.00 / M 13,000.00 13,000.00 13,000.00 M L. Bajo

11 Kabel NYM 4 x 4 mm2 37,800.00 / M 37,800.00 37,800.00 37,800.00 M L. Bajo

12 Kabel NYMHY 4 x 2,5 mm2 29,400.00 / M 29,400.00 29,400.00 29,400.00 M L. Bajo

KABEL GROUNDING TERPASANG

1 Kabel BC 240 mm2 245,000.00 / M 245,000.00 245,000.00 245,000.00 M L. Bajo

2 Kabel BC 185 mm2 194,800.00 / M 194,800.00 194,800.00 194,800.00 M L. Bajo

3 Kabel BC 150 mm2 153,000.00 / M 153,000.00 153,000.00 153,000.00 M L. Bajo

4 Kabel BC 120 mm2 93,200.00 / M 93,200.00 93,200.00 93,200.00 M L. Bajo

5 Kabel BC 95 mm2 78,800.00 / M 78,800.00 78,800.00 78,800.00 M L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
6 Kabel BC 70 mm2 60,775.00 / M 60,775.00 60,775.00 60,775.00 M L. Bajo

7 Kabel BC 50 mm2 45,045.00 / M 45,045.00 45,045.00 45,045.00 M L. Bajo

8 Kabel BC 35 mm2 32,175.00 / M 32,175.00 32,175.00 32,175.00 M L. Bajo

9 Kabel BC 25 mm2 22,880.00 / M 22,880.00 22,880.00 22,880.00 M L. Bajo

10 Kabel BC 16 mm2 15,015.00 / M 15,015.00 15,015.00 15,015.00 M L. Bajo

11 Kabel BC 10 mm2 9,009.00 / M 9,009.00 9,009.00 9,009.00 M L. Bajo

12 Kabel BC 6 mm2 5,863.00 / M 5,863.00 5,863.00 5,863.00 M L. Bajo

13 Kabel BC 4 mm2 3,900.00 / M 3,900.00 3,900.00 3,900.00 M L. Bajo

PEKERJAAN PEMASANGAN LAMPU

LAMPU

Lampu RM 300 3X18W ACR SAVY,T LED ESS 3 X


1 1,520,503.00 / Bh 1,520,503.00 1,520,503.00 1,520,503.00 Bh L. Bajo
8W

2 Lampu RM 300 ACR 3X18W/54 + BATT 2,041,200.00 / Bh 2,041,200.00 2,041,200.00 2,041,200.00 Bh L. Bajo

Lampu RM 300 2X18W ACR SAVY ,T LED ESS 2 X


3 923,256.00 / Bh 923,256.00 923,256.00 923,256.00 Bh L. Bajo
8W

Lampu RM 300 2X18W ACR SAVY T LED 2 X 8W


4 2,647,900.00 / Bh 2,647,900.00 2,647,900.00 2,647,900.00 Bh L. Bajo
+ BATT

5 BARET SCB 20 ACR 11,5 W 477,500.00 / Bh 477,500.00 477,500.00 477,500.00 Bh L. Bajo

6 BARET SCB 20 ACR LED KTK 24W + BATT 2,470,425.00 / Bh 2,470,425.00 2,470,425.00 2,470,425.00 Bh L. Bajo

7 Down Light RD 125 E 27 SAVY LED BULB 6,5-60W 120,000.00 / Bh 120,000.00 120,000.00 120,000.00 Bh L. Bajo

Lampu RM 300 2X18W M2 SAVY ,T LED ESS 2 X


8 833,474.00 / Bh 833,474.00 833,474.00 833,474.00 Bh L. Bajo
8W

Down Light RD 150 E 27 SAVY LED BULB 10,5-


9 150,000.00 / Bh 150,000.00 150,000.00 150,000.00 Bh L. Bajo
85W

TK CG 1X36W SAVY T LED ESS 1 X 14,5W


10 430,037.00 / Bh 430,037.00 430,037.00 430,037.00 Bh L. Bajo
1600lm
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
11 Lampu Taman GL TOP TRP T 27 PL ESS 35W 2,171,100.00 / Bh 2,171,100.00 2,171,100.00 2,171,100.00 Bh L. Bajo

Lampu RM 300 2X36W M2 SAVY ,T LED ESS 2 X


12 1,276,238.00 / Bh 1,276,238.00 1,276,238.00 1,276,238.00 Bh L. Bajo
14,5W

WATHERPROOF ELEKTRA,PC 1X36,T-LED


13 2,976,238.00 / Bh 2,976,238.00 2,976,238.00 2,976,238.00 Bh L. Bajo
ESST.1X16W+BATT.

14 RM 300 2X36 ACR SAVY, T LED ESS 2X14,5W 862,000.00 / Bh 862,000.00 862,000.00 862,000.00 Bh L. Bajo

RM 300 2X36W ACR SAVY T LED 2 X 16W


15 3,078,525.00 / Bh 3,078,525.00 3,078,525.00 3,078,525.00 Bh L. Bajo
+BATT.

Lampu Strip Light indoor 10-77W ( 10 m) life time


16 343,980.00 / Bh 343,980.00 343,980.00 343,980.00 Bh L. Bajo
50.000 jam + trafo

Down Light Outbow chotac 150 E 27 LED BULB 8-


17 373,700.00 / Bh 373,700.00 373,700.00 373,700.00 Bh L. Bajo
70W

18 EXIT LED AL 1MKHUGO (komplet set) 1,403,804.00 / Bh 1,403,804.00 1,403,804.00 1,403,804.00 Bh L. Bajo

19 Lampu sorot LED 80W (set) 3,494,300.00 / Bh 3,494,300.00 3,494,300.00 3,494,300.00 Bh L. Bajo

20 Lampu sorot pohon morisca 50w 560,900.00 / Bh 560,900.00 560,900.00 560,900.00 Bh L. Bajo

21 Lampu PJU led 80W + Tiang 7m+fondasi 9,277,626.00 / Bh 9,277,626.00 9,277,626.00 9,277,626.00 Bh L. Bajo

22 Stop Kontak 15,600.00 / Bh 15,600.00 15,600.00 15,600.00 Bh L. Bajo

23 Stop Kontak Lantai(3 MODUL) 759,500.00 / Bh 759,500.00 759,500.00 759,500.00 Bh L. Bajo

24 Sakelar Ganda 22,500.00 / Bh 22,500.00 22,500.00 22,500.00 Bh L. Bajo

25 Sakelar Tunggal 11,900.00 / Bh 11,900.00 11,900.00 11,900.00 Bh L. Bajo

26 Sakelar Hotel 14,500.00 / Bh 14,500.00 14,500.00 14,500.00 Bh L. Bajo

27 Sakelar Cam/Handle 57,500.00 / Bh 57,500.00 57,500.00 57,500.00 Bh L. Bajo

BAHAN INSTALASI

1 Kabel, NYM 3 x 2,5 mm2 ( Ex Supreme ) 13,000.00 / M 13,000.00 13,000.00 13,000.00 M L. Bajo

2 Pipa Conduit 20MM 3,500.00 / M 3,500.00 3,500.00 3,500.00 M L. Bajo

3 In Bow Doos 1,950.00 / Bh 1,950.00 1,950.00 1,950.00 Bh L. Bajo

4 Tee Doos 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

5 Klem Pipa 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

6 Fhiser 1,500.00 / Bh 1,500.00 1,500.00 1,500.00 Bh L. Bajo

7 Las Doop 500.00 / Bh 500.00 500.00 500.00 Bh L. Bajo

8 Isolasi 5,000.00 / Bh 5,000.00 5,000.00 5,000.00 Bh L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
PEKERJAAN PEMASANGAN PANEL

PANEL

1 Panel 80 x 200 x 70 cm Standing Floor 7,500,000.00 / Unit 7,500,000.00 7,500,000.00 7,500,000.00 Unit L. Bajo

2 Panel 80 x 180 x 70 cm Standing Floor 6,000,000.00 / Unit 6,000,000.00 6,000,000.00 6,000,000.00 Unit L. Bajo

3 Panel 80 x 120 x 30 cm wall mounted 2,500,000.00 / Unit 2,500,000.00 2,500,000.00 2,500,000.00 Unit L. Bajo

4 Panel 70 x 110 x 30 cm wall mounted 2,250,000.00 / Unit 2,250,000.00 2,250,000.00 2,250,000.00 Unit L. Bajo

5 Panel 60 x 80 x 30 cm wall mounted 2,000,000.00 / Unit 2,000,000.00 2,000,000.00 2,000,000.00 Unit L. Bajo

6 Panel 40 x 60 x 25 cm wall mounted 1,800,000.00 / Unit 1,800,000.00 1,800,000.00 1,800,000.00 Unit L. Bajo

7 Panel 30 x 40 x 20 cm wall mounted 1,400,000.00 / Unit 1,400,000.00 1,400,000.00 1,400,000.00 Unit L. Bajo

8 Panel PJU 40 x 60 x 25 cm outdoor 1,250,000.00 / Unit 1,250,000.00 1,250,000.00 1,250,000.00 Unit L. Bajo

9 Box Hager 4 group 221,700.00 / Unit 221,700.00 221,700.00 221,700.00 Unit L. Bajo

10 Box Hager 6 group 258,000.00 / Unit 258,000.00 258,000.00 258,000.00 Unit L. Bajo

11 Box Hager 8 group 280,000.00 / Ttk 280,000.00 280,000.00 280,000.00 Ttk L. Bajo

ACCESSORIS

1 Lampu Indikator 3 warna (Telemekanic) + fuse 115,000.00 / Bh 115,000.00 115,000.00 115,000.00 Bh L. Bajo

2 Selector Switch Volt meter, 7 posisi 500,000.00 / Bh 500,000.00 500,000.00 500,000.00 Bh L. Bajo

3 Ampere meter, Skala 400 A (GAE) 445,500.00 / Bh 445,500.00 445,500.00 445,500.00 Bh L. Bajo

4 Volt Meter AC 220 / 380 V (GAE) 415,000.00 / Bh 415,000.00 415,000.00 415,000.00 Bh L. Bajo

5 Cos φ meter 450,000.00 / Bh 450,000.00 450,000.00 450,000.00 Bh L. Bajo

6 Frequensi Meter 48-52 LED (GAE) 517,000.00 / Bh 517,000.00 517,000.00 517,000.00 Bh L. Bajo

7 kWH Meter 3 fasa 3,800,000.00 / Bh 3,800,000.00 3,800,000.00 3,800,000.00 Bh L. Bajo

8 CT 1000/5 781,000.00 / Bh 781,000.00 781,000.00 781,000.00 Bh L. Bajo

9 CT 500/5 461,000.00 / Bh 461,000.00 461,000.00 461,000.00 Bh L. Bajo

10 CT 100/5 315,000.00 / Bh 315,000.00 315,000.00 315,000.00 Bh L. Bajo

11 Timer Switch + kontaktor 934,800.00 / Bh 934,800.00 934,800.00 934,800.00 Bh L. Bajo

BAHAN INSTALASI

1 Pipa Spitzen / tembaga dia 1 1/2 " 250,000.00 / Ljr 250,000.00 250,000.00 250,000.00 Ljr L. Bajo

2 Kawat BC 70 46,750.00 / M 46,750.00 46,750.00 46,750.00 M L. Bajo

3 Kawat BC 35 24,750.00 / M 24,750.00 24,750.00 24,750.00 M L. Bajo

4 klem tembaga 75,000.00 / Bh 75,000.00 75,000.00 75,000.00 Bh L. Bajo

5 shock besi dia 1 1/2' 5,000.00 / Bh 5,000.00 5,000.00 5,000.00 Bh L. Bajo

6 Bak kontrol 40 x 40 lengkap 500,000.00 / Unit 500,000.00 500,000.00 500,000.00 Unit L. Bajo
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
ACB, MCCB DAN MCB

MCCB

1 MCCB NS Micrologic 5.1 320-800 A/3P/70ka 14,500,000.00 / Bh 14,500,000.00 14,500,000.00 14,500,000.00 Bh L. Bajo

2 MCCB 100, 125, 160, 200, 225, 250 A /3 P/36 kA 1,800,000.00 / Bh 1,800,000.00 1,800,000.00 1,800,000.00 Bh L. Bajo

MCCB 15, 20, 25, 30, 40, 50, 60, 75, 80, 100 A /3
3 938,000.00 / Bh 938,000.00 938,000.00 938,000.00 Bh L. Bajo
P/30 kA

4 MCCB 100, 125, 160, 200, 225, 250 A /3 P/25 kA 1,731,000.00 / Bh 1,731,000.00 1,731,000.00 1,731,000.00 Bh L. Bajo

5 MCCB 100, 125, 160, 200, 225, 250 A /3 P/18 kA 1,385,000.00 / Bh 1,385,000.00 1,385,000.00 1,385,000.00 Bh L. Bajo

MCCB 15, 20, 25, 30, 40, 50, 60, 75, 80, 100 A /3
6 797,500.00 / Bh 797,500.00 797,500.00 797,500.00 Bh L. Bajo
P/18 kA

MCB 3 PHASE

1 MCB 25, 32, 40A/3P/6 KA 269,000.00 / Bh 269,000.00 269,000.00 269,000.00 Bh L. Bajo

2 MCB 6, 10, 16, 20A/3P/6 KA 240,000.00 / Bh 240,000.00 240,000.00 240,000.00 Bh L. Bajo

3 MCB 25, 32, 40 A/3P/4,5 KA 245,000.00 / Bh 245,000.00 245,000.00 245,000.00 Bh L. Bajo

4 MCB 6, 10, 16, 20A/3P/4,5 KA 222,000.00 / Bh 222,000.00 222,000.00 222,000.00 Bh L. Bajo

MCB 1 PHASE

1 MCB 50, 63A/1P/4.5 KA 136,000.00 / Bh 136,000.00 136,000.00 136,000.00 Bh L. Bajo

2 MCB 2, 4, 6,10,16 ,20, 25, 32, 40A/1P/4.5 KA 62,500.00 / Bh 62,500.00 62,500.00 62,500.00 Bh L. Bajo

PEKERJAAN PEMASANGAN AIR CONDITIONER


& EXHAUST FAN

AC

1 AC 2 PK Split Wall Mounted 13,000,000.00 / Unit 13,000,000.00 13,000,000.00 13,000,000.00 Unit L. Bajo

2 AC 5 PK Ceiling Cassete 20,000,000.00 / Unit 20,000,000.00 20,000,000.00 20,000,000.00 Unit L. Bajo

3 AC 3 PK Ceiling Cassete 15,000,000.00 / Unit 15,000,000.00 15,000,000.00 15,000,000.00 Unit L. Bajo

4 AC 2,5 PK Ceiling Cassete 19,750,000.00 / Unit 19,750,000.00 19,750,000.00 19,750,000.00 Unit L. Bajo

5 AC 2,5 PK Split Wall Mounted 19,750,000.00 / Unit 19,750,000.00 19,750,000.00 19,750,000.00 Unit L. Bajo
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
6 AC 1.5 PK Split Wall Mounted 10,500,000.00 / Unit 10,500,000.00 10,500,000.00 10,500,000.00 Unit L. Bajo

7 AC 1 PK Split Wall Mounted 6,750,000.00 / Unit 6,750,000.00 6,750,000.00 6,750,000.00 Unit L. Bajo

8 AC 3/4 PK Split Wall Mounted 2,500,000.00 / Unit 2,500,000.00 2,500,000.00 2,500,000.00 Unit L. Bajo

9 AC 2 PK Ceiling Cassete 12,000,000.00 / Unit 12,000,000.00 12,000,000.00 12,000,000.00 Unit L. Bajo

10 Ceiling Concealed (High Static) 29,834,200.00 / Unit 29,834,200.00 29,834,200.00 29,834,200.00 Unit L. Bajo

11 95900 BTU/H

12 Outdoor Multi-V IV 49,129,300.00 / Unit 49,129,300.00 49,129,300.00 49,129,300.00 Unit L. Bajo

13 95900 BTU/H

EXHAUST FAN

1 Exhaust fan 110 Cfm Ceiling Mounted 450,000.00 / Unit 450,000.00 450,000.00 450,000.00 Unit L. Bajo

2 Exhaust fan 1000 Cfm Wall Mounted 3,762,000.00 / Unit 3,762,000.00 3,762,000.00 3,762,000.00 Unit L. Bajo

3 Exhaust fan 2000 Cfm Wall Mounted 4,068,900.00 / Unit 4,068,900.00 4,068,900.00 4,068,900.00 Unit L. Bajo

BAHAN INSTALASI

1 Pipa Refrigerant 1-2 pk + isolasi 93,800.00 / M 93,800.00 93,800.00 93,800.00 M L. Bajo

2 Pipa Refrigerant 3-4 pk + isolasi 134,600.00 / M 134,600.00 134,600.00 134,600.00 M L. Bajo

3 Pangkon out door 137,500.00 / Psng 137,500.00 137,500.00 137,500.00 Psng L. Bajo

4 Pipa drain PVC 3/4" 7,200.00 / m 7,200.00 7,200.00 7,200.00 m L. Bajo

5 Kabel Power NYM 3 x 2.5 mm2 (1-2 PK) 16,000.00 / M 16,000.00 16,000.00 16,000.00 M L. Bajo

6 Kabel kontrol NYM 2 x 2.5 mm2 (1-2 PK) 13,000.00 / M 13,000.00 13,000.00 13,000.00 M L. Bajo

7 Kabel kontrol NYM 4 x 2.5 mm2 (3-5 PK) 22,200.00 / M 22,200.00 22,200.00 22,200.00 M L. Bajo

8 Kabel Power NYM 4 x 4 mm2 (3-5 PK) 32,000.00 / M 32,000.00 32,000.00 32,000.00 M L. Bajo

9 Kabel NYA 2.5 mm 10,200.00 / M 10,200.00 10,200.00 10,200.00 M L. Bajo

10 Exhaust Air Grille 45X45 cm 159,000.00 / Bh 159,000.00 159,000.00 159,000.00 Bh L. Bajo

11 Ducting dengan pipa PVC Ø 4' 40,000.00 / M 40,000.00 40,000.00 40,000.00 M L. Bajo

12 Klem Pipa 7,000.00 / Bh 7,000.00 7,000.00 7,000.00 Bh L. Bajo

13 T dos 5,000.00 / Bh 5,000.00 5,000.00 5,000.00 Bh L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
PEKERJAAN SOUND SISTEM

SOUND SYSTEM

1 Power Amplifier 1000 (4X250) Watt 20,000,000.00 / Unit 20,000,000.00 20,000,000.00 20,000,000.00 Unit L. Bajo

2 Power Amplifier 240 Watt 4,565,000.00 / Unit 4,565,000.00 4,565,000.00 4,565,000.00 Unit L. Bajo

3 Power Amplifier 120 Watt 2,667,000.00 / Unit 2,667,000.00 2,667,000.00 2,667,000.00 Unit L. Bajo

4 Power Amplifier 60 Watt 1,500,000.00 / Unit 1,500,000.00 1,500,000.00 1,500,000.00 Unit L. Bajo

5 Digital Mixer Pre- Amp(build in equalizer) 25,000,000.00 / Unit 25,000,000.00 25,000,000.00 25,000,000.00 Unit L. Bajo

6 Equalizer 30 Channel 1,500,000.00 / Unit 1,500,000.00 1,500,000.00 1,500,000.00 Unit L. Bajo

7 Emergency Massage w/Evac Voice 9,083,800.00 / Unit 9,083,800.00 9,083,800.00 9,083,800.00 Unit L. Bajo

8 CD/MMC/USB Player with tunner 4,420,900.00 / Unit 4,420,900.00 4,420,900.00 4,420,900.00 Unit L. Bajo

9 Dynamic Microphone 669,000.00 / Bh 669,000.00 669,000.00 669,000.00 Bh L. Bajo

10 Outlet Microphone 165,000.00 / Bh 165,000.00 165,000.00 165,000.00 Bh L. Bajo

11 Outlet Sound System 78,000.00 / Bh 78,000.00 78,000.00 78,000.00 Bh L. Bajo

12 Selector Switch 10 Zone 3,960,000.00 / Bh 3,960,000.00 3,960,000.00 3,960,000.00 Bh L. Bajo

13 Sound Terminal Box 10 pairs uk. 20x15x25 cm + mtrl 455,000.00 / Bh 455,000.00 455,000.00 455,000.00 Bh L. Bajo

14 Volume Control 6 watt 156,200.00 / Bh 156,200.00 156,200.00 156,200.00 Bh L. Bajo

15 Ceiling speaker 6 watt 240,900.00 / Bh 240,900.00 240,900.00 240,900.00 Bh L. Bajo

16 Coloum Speaker 20 watt 728,000.00 / Bh 728,000.00 728,000.00 728,000.00 Bh L. Bajo

17 Horn Speaker 25 w 599,000.00 / Bh 599,000.00 599,000.00 599,000.00 Bh L. Bajo

18 Cabinet Rack with Acc 24,500,000.00 / Bh 24,500,000.00 24,500,000.00 24,500,000.00 Bh L. Bajo

19 Remote micropone w/keypad zone selector 7,370,550.00 / Bh 7,370,550.00 7,370,550.00 7,370,550.00 Bh L. Bajo

BAHAN INSTALASI

1 Kabel, NYMHY 2 X 2,5 mm2 15,400.00 / M 15,400.00 15,400.00 15,400.00 M L. Bajo

2 Pipa Conduit 3,500.00 / M 3,500.00 3,500.00 3,500.00 M L. Bajo

3 Socket Pipa 850.00 / Bh 850.00 850.00 850.00 Bh L. Bajo

4 Tee Doos 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

5 Klem Pipa 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

6 Fhiser 1,500.00 / Bh 1,500.00 1,500.00 1,500.00 Bh L. Bajo


HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
PEKERJAAN FIRE ALARM & APAR

1 Mater Control Panel 5 Zone 5,564,160.00 / Unit 5,564,160.00 5,564,160.00 5,564,160.00 Unit L. Bajo

2 Annunciator Panel 5 Zone 2,632,500.00 / Unit 2,632,500.00 2,632,500.00 2,632,500.00 Unit L. Bajo

3 Terminal Box Fire Alarm 12 Pair 325,000.00 / Bh 325,000.00 325,000.00 325,000.00 Bh L. Bajo

4 Terminal Box Fire Alarm 24 Pair 575,000.00 / Bh 575,000.00 575,000.00 575,000.00 Bh L. Bajo

5 Rate Of Rise Heat Detector HC-306 295,000.00 / Bh 295,000.00 295,000.00 295,000.00 Bh L. Bajo

6 Fixed Temperature Heat Detector HC-407 62,000.00 / Bh 62,000.00 62,000.00 62,000.00 Bh L. Bajo

7 Smoke Detector (Independent) HC-208 521,640.00 / Bh 521,640.00 521,640.00 521,640.00 Bh L. Bajo

8 Manual Push Button (Break glass) 375,500.00 / Bh 375,500.00 375,500.00 375,500.00 Bh L. Bajo

9 Alarm Bell 6" 24 VDC 318,020.60 / Bh 318,020.60 318,020.60 318,021.00 Bh L. Bajo

10 Indicating Lamp HC-300L 165,000.00 / Bh 165,000.00 165,000.00 165,000.00 Bh L. Bajo

11 Fire Extinguser's 25 Kg Trolly u/ R. Pompa, Genset 12,500,000.00 / Bh 12,500,000.00 12,500,000.00 12,500,000.00 Bh L. Bajo

12 Fire Extinguser's 50 Kg u/ R. Panel 14,000,000.00 / Bh 14,000,000.00 14,000,000.00 14,000,000.00 Bh L. Bajo

13 Fire Extinguisher 6 kg 2,800,000.00 / Bh 2,800,000.00 2,800,000.00 2,800,000.00 Bh L. Bajo

14 Fire Extinguisher 3 kg 850,000.00 / Bh 850,000.00 850,000.00 850,000.00 Bh L. Bajo

BAHAN INSTALASI

1 Kabel, NYMHY 2 X 1,5 mm2 9,800.00 / M 9,800.00 9,800.00 9,800.00 M L. Bajo

2 Pipa Conduit 3,500.00 / M 3,500.00 3,500.00 3,500.00 M L. Bajo

3 Socket Pipa 850.00 / Bh 850.00 850.00 850.00 Bh L. Bajo

4 Tee Doos 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

5 Klem Pipa 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

6 Fhiser 1,500.00 / Bh 1,500.00 1,500.00 1,500.00 Bh L. Bajo

PEKERJAAN PEMASANGAN TELEPHONE

1 PABX 3 Line 8 ext 2,250,000.00 / Unit 2,250,000.00 2,250,000.00 2,250,000.00 Unit L. Bajo

2 PABX 6 Line 16 ext 4,150,000.00 / Unit 4,150,000.00 4,150,000.00 4,150,000.00 Unit L. Bajo

3 PABX 8 Line 24 ext KX TDA 100 8,300,000.00 / Unit 8,300,000.00 8,300,000.00 8,300,000.00 Unit L. Bajo

4 PABX 16 Line 40 ext KX TDA 200 16,600,000.00 / Unit 16,600,000.00 16,600,000.00 16,600,000.00 Unit L. Bajo

5 PABX 8 line 64 ext 75,000,000.00 / Unit 75,000,000.00 75,000,000.00 75,000,000.00 Unit L. Bajo
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
6 Terminal Box Telephone 455,000.00 / Bh 455,000.00 455,000.00 455,000.00 Bh L. Bajo

7 Outlet telephon 66,000.00 / Bh 66,000.00 66,000.00 66,000.00 Bh L. Bajo

8 Key telephon display 2,000,000.00 / Bh 2,000,000.00 2,000,000.00 2,000,000.00 Bh L. Bajo

9 Pesawat Telepon Standart 500,000.00 / Bh 500,000.00 500,000.00 500,000.00 Bh L. Bajo

MDF+Arester pelindung petir + kabel power +


10 5,500,000.00 / Unit 5,500,000.00 5,500,000.00 5,500,000.00 Unit L. Bajo
grounding

11 Batteryfor back up stanby (-/+30 menite) 6,500,000.00 / Bh 6,500,000.00 6,500,000.00 6,500,000.00 Bh L. Bajo

12 Kabel ITC 1 (2x0,6) mm2 (1 pair) 2,500.00 / M 2,500.00 2,500.00 2,500.00 M L. Bajo

13 Kabel ITC 10 (2x0,6) mm2 (10 pair) 16,000.00 / M 16,000.00 16,000.00 16,000.00 M L. Bajo

14 Kabel ITC 20 (2x0,6) mm2 (20 pair) 26,000.00 / M 26,000.00 26,000.00 26,000.00 M L. Bajo

15 Kabel ITC 40 (2x0,6) mm2 (40 pair) 53,000.00 / M 53,000.00 53,000.00 53,000.00 M L. Bajo

16 Kabel ITC 50 (2x0,6) mm2 (50 pair) 62,000.00 / M 62,000.00 62,000.00 62,000.00 M L. Bajo

BAHAN INSTALASI

1 Kabel ITC 2x0,6mm2 2,500.00 / M 2,500.00 2,500.00 2,500.00 M L. Bajo

2 Pipa Conduit 3,500.00 / M 3,500.00 3,500.00 3,500.00 M L. Bajo

3 Socket Pipa 850.00 / M 850.00 850.00 850.00 M L. Bajo

4 Tee Doos 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

5 Klem Pipa 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

6 Fhiser 1,500.00 / Bh 1,500.00 1,500.00 1,500.00 Bh L. Bajo

PEKERJAAN KABEL TRAY

1 Kabel Tray Tipe U (200x100 mm) 176,333.33 / M 176,333.33 176,333.33 176,333.00 M L. Bajo

2 Kabel Tray Tipe U (300x100 mm) 220,333.33 / M 220,333.33 220,333.33 220,333.00 M L. Bajo

3 Kabel Ladder Tipe U (200x100 mm) 127,000.00 / M 127,000.00 127,000.00 127,000.00 M L. Bajo

4 Kabel Ladder Tipe U (400x100 mm) 197,666.67 / M 197,666.67 197,666.67 197,667.00 M L. Bajo

5 Besi siku 4.4.4 24,166.67 / M 24,166.67 24,166.67 24,167.00 M L. Bajo

6 Mur Baut + Fisher 1,650.00 / Pcs 1,650.00 1,650.00 1,650.00 Pcs L. Bajo
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
BAHAN INSTALASI

1 Kabel NYM 3 X 2,5 mm 16,000.00 / M 16,000.00 16,000.00 16,000.00 M L. Bajo

2 Pipa conduit 3,500.00 / ljr 3,500.00 3,500.00 3,500.00 ljr L. Bajo

3 Socket Pipa 850.00 / bh 850.00 850.00 850.00 bh L. Bajo

4 Tee Doos 4,400.00 / bh 4,400.00 4,400.00 4,400.00 bh L. Bajo

5 Klem Pipa 4,400.00 / bh 4,400.00 4,400.00 4,400.00 bh L. Bajo

6 Inbow dos 3,500.00 / bh 3,500.00 3,500.00 3,500.00 bh L. Bajo

PEKERJAAN PEMASANGAN MA TV

1 Antena UHV/VHF 358,580.00 / Unit 358,580.00 358,580.00 358,580.00 Unit L. Bajo

2 Boster 48 db 4,275,500.00 / Unit 4,275,500.00 4,275,500.00 4,275,500.00 Unit L. Bajo

3 Spliter 8 way 487,200.00 / Unit 487,200.00 487,200.00 487,200.00 Unit L. Bajo

4 Outlet TV 85,000.00 / Unit 85,000.00 85,000.00 85,000.00 Unit L. Bajo

5 Spliter 4 way 260,000.00 / Unit 260,000.00 260,000.00 260,000.00 Unit L. Bajo

6 Televisi LED 32 inc + support galvanis gantungan 2,500,000.00 / Bh 2,500,000.00 2,500,000.00 2,500,000.00 Bh L. Bajo

BAHAN INSTALASI

1 Kabel, Coaxial 5C-2V 13,000.00 / M 13,000.00 13,000.00 13,000.00 M L. Bajo

2 Pipa Conduit 3,500.00 / M 3,500.00 3,500.00 3,500.00 M L. Bajo

3 Socket Pipa 850.00 / Bh 850.00 850.00 850.00 Bh L. Bajo

4 Tee Doos 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

5 Klem Pipa 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

6 Fhiser 1,500.00 / Bh 1,500.00 1,500.00 1,500.00 Bh L. Bajo

PEKERJAAN PEMASANGAN CCTV

1 Indoor Fixed Dome Camera 1,350,000.00 / Unit 1,350,000.00 1,350,000.00 1,350,000.00 Unit L. Bajo

2 IP Indoor Dome Camera 602,000.00 / Unit 602,000.00 602,000.00 602,000.00 Unit L. Bajo

3 Indoor Pan / Tilt / Zoom Camera 1,500,000.00 / Unit 1,500,000.00 1,500,000.00 1,500,000.00 Unit L. Bajo

4 NVR 16 Channel W/ HDD 4TB 5,283,000.00 / Unit 5,283,000.00 5,283,000.00 5,283,000.00 Unit L. Bajo

5 32" LED TV 2,500,000.00 / Unit 2,500,000.00 2,500,000.00 2,500,000.00 Unit L. Bajo

6 24 VAC Power Supply 1,342,500.00 / Unit 1,342,500.00 1,342,500.00 1,342,500.00 Unit L. Bajo

7 Positioning Device Colroller 6,662,750.00 / Unit 6,662,750.00 6,662,750.00 6,662,750.00 Unit L. Bajo
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
BAHAN INSTALASI

1 Kabel RG - 59 3,500.00 / M 3,500.00 3,500.00 3,500.00 M L. Bajo

2 Kabel STP 18 AWG 10,500.00 / M 10,500.00 10,500.00 10,500.00 M L. Bajo

3 Kabel NYMHY 3 x 2,5 mm2 21,000.00 / M 21,000.00 21,000.00 21,000.00 M L. Bajo

4 Pipa Conduit 3,500.00 / M 3,500.00 3,500.00 3,500.00 M L. Bajo

5 Socket Pipa 850.00 / Bh 850.00 850.00 850.00 Bh L. Bajo

6 Tee Doos 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

7 Klem Pipa 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

8 Fhiser 1,500.00 / Bh 1,500.00 1,500.00 1,500.00 Bh L. Bajo

PEKERJAAN PEMASANGAN LAN

1 Switch Hub 24 port 800,000.00 / Unit 800,000.00 800,000.00 800,000.00 Unit L. Bajo

2 Switch Hub 16 port 764,905.00 / Unit 764,905.00 764,905.00 764,905.00 Unit L. Bajo

3 Switch Hub 8 port 390,500.00 / Unit 390,500.00 390,500.00 390,500.00 Unit L. Bajo

4 Outlet RJ45 inbow 73,000.00 / Bh 73,000.00 73,000.00 73,000.00 Bh L. Bajo

BAHAN INSTALASI

1 Kabel UTP CAT 6 E 3,960.00 / M 3,960.00 3,960.00 3,960.00 M L. Bajo

2 Kabel labeling 6,600.00 / M 6,600.00 6,600.00 6,600.00 M L. Bajo

3 Pipa Conduit 3,500.00 / M 3,500.00 3,500.00 3,500.00 M L. Bajo

4 Socket Pipa 850.00 / M 850.00 850.00 850.00 M L. Bajo

5 Tee Doos 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

6 Klem Pipa 4,400.00 / Bh 4,400.00 4,400.00 4,400.00 Bh L. Bajo

7 Fhiser 1,500.00 / Bh 1,500.00 1,500.00 1,500.00 Bh L. Bajo

PEKERJAAN PEMASANGAN NURSE CALL

1 20 Call Master Master 16,715,500.00 / Bh 16,715,500.00 16,715,500.00 16,715,500.00 Bh L. Bajo

2 Power Supply 1,700,500.00 / Bh 1,700,500.00 1,700,500.00 1,700,500.00 Bh L. Bajo

3 Call Button u/ Bed 350,900.00 / Bh 350,900.00 350,900.00 350,900.00 Bh L. Bajo

4 Receptacle For Call Button 335,500.00 / Bh 335,500.00 335,500.00 335,500.00 Bh L. Bajo

5 Call Speaker Sub Station Ceiling Mounted 1,450,000.00 / Bh 1,450,000.00 1,450,000.00 1,450,000.00 Bh L. Bajo
HRAGA BARANG YANG
TOKO SUMBER BAHAN / MATERIAL ( Rp. )

SMS/WA/TELP / TANYA

KAPASITAS/SATUAN
SUMBER DATA VIA

SATUAN RENCANA

MATERIAL/BAHAN
HARGA BARANG

DIRENCANAKAN

LOKASI/ QUARY
6 Reset Button 246,350.00 / Bh 246,350.00 246,350.00 246,350.00 Bh L. Bajo

7 Corridor Lamp 315,250.00 / Bh 315,250.00 315,250.00 315,250.00 Bh L. Bajo

8 Bathroom pullcord u/kamar mandi 925,200.00 / Bh 925,200.00 925,200.00 925,200.00 Bh L. Bajo

9 Installasi kabel ITC 2 X 2 X 0,6 mm dalam conduite ttk ttk

PEKERJAAN PEMASANGAN PENANGKAL PETIR

Head Penangkal Petir non radioaktif radius 150 m Ex.


1 5,400,000.00 / unit 5,400,000.00 5,400,000.00 5,400,000.00 unit L. Bajo
Kurn

2 Down Conductor NYY 1x70 mm 133,500.00 / m 133,500.00 133,500.00 133,500.00 m L. Bajo

Dudukan Tiang, Tiang Penangkal Petir (5 Meter) dan


3 1,000,000.00 / unit 1,000,000.00 1,000,000.00 1,000,000.00 unit L. Bajo
mtrl bantu

4 Grounding Sistem, Bak kontrol, dan Instalasi 1,800,000.00 / ls 1,800,000.00 1,800,000.00 1,800,000.00 ls L. Bajo

5 Klem & material bantu 450,000.00 / ls 450,000.00 450,000.00 450,000.00 ls L. Bajo

6 Perijinanan 3,000,000.00 / ls 3,000,000.00 3,000,000.00 3,000,000.00 ls L. Bajo

M Bahan Bakar dan Minyak Pelumas

1 Bahan Bakar Premium ( Non Subsidi ) 7,650.00 / Ltr 1 Ltr 7,650.00 7,650.00 7,650.00 Ltr L. Bajo

2 Bahan Bakar Solar ( Non Subsidi ) 13,700.00 / Ltr 1 Ltr 13,700.00 13,700.00 13,700.00 Ltr L. Bajo

3 Minyak Pelumas 27,000.00 / Ltr 1 Ltr 27,000.00 27,000.00 27,000.00 Ltr L. Bajo

4 Minyak Bekisting 7,500.00 / Ltr 1 Liter 7,500.00 7,500.00 7,500.00 Liter L. Bajo

-
PERHITUNGAN ANGKUTAN MATERIAL ON SITE MENGGUNAKAN DUMP TRUCK KAP. 3 - 4 TON

PERHITUNGAN ANGKUTAN MATERIAL

PERHITUNGAN ANGKUTAN PERHITUNGAN TENAGA MANUSIA

TOTAL ONGKOS/UNIT (RP) SAMPAI DI LOKASI PEKERJAAN


BIAYA

(KM/JAM)
MEMBONGKAR +
BIAYA MEMUAT

(KM/JAM)
WAKTU SIKLUS (TS ) MENGGANGKUT
KE DUMP TRUCK

JARAK ANGKUT RATA-RATA (KM)


KE LOKASI

KAPASITAS PRODUKSI/UNIT
(MENIT)
PEKERJAAN

SUMBER MATERIAL/ QUARY


SEWA DUMP TRUCK (JAM )
KAPASITAS BAK (M3)

ONGKOS ANGKUT
WAKTU MEMUAT KE DUMPTRUCK
WAKTU TEMPUH BERMUATAN
EFISIENSI ALAT

KEC. RATA-RATA BERMUATAN

WAKTU TEMPUH KOSONG (


KEC. RATA-RATA KOSONG

BIAYA MEMBONGKAR
SATUAN

NO MATERIAL

WAKTU MEMBONGKAR

JUMLAH PEKERJA

BIAYA MEMUAT

JUMLAH PEKERJA
TOTAL WAKTU
(MENIT)

MENIT)
( L / V1 ) x 60 ( L / V2 ) x 60 (Kb X EaX60)/TS ( 1 / Q) x FT (T3/60XJPk)/Kb (T4/60XJPk)/Kb
Kb. Ea L V1 V2 FT T1 T2 T3 T4 TS Q ( RP. ) JPk R1 JPk R1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 = 16 +18 +20 22
I BAHAN LOKAL
1 Balok Kayu Kelas I (Lokal) Jati M³ 3.50 0.80 1.50 20.00 30.00 308,324.11 4.50 3.00 30.00 30.00 67.50 2.49 123,880.22 - - - - 123,880.22 L. Bajo
2 Papan Kayu Kelas I (Lokal) Jati M³ 3.50 0.80 1.50 20.00 30.00 308,324.11 4.50 3.00 30.00 30.00 67.50 2.49 123,880.22 - - - - 123,880.22 L. Bajo
3 Papan Kayu Klas II Lokal M³ 3.50 0.80 1.50 20.00 30.00 308,324.11 4.50 3.00 30.00 30.00 67.50 2.49 123,880.22 - - - - 123,880.22 L. Bajo
4 Balok Kayu Klas II 5/7 CM (Lokal) M³ 3.50 0.80 1.50 20.00 30.00 308,324.11 4.50 3.00 30.00 30.00 67.50 2.49 123,880.22 - - - - 123,880.22 L. Bajo
5 Balok Kayu Klas II 8/12 CM (Lokal) M³ 3.50 0.80 1.50 20.00 30.00 308,324.11 4.50 3.00 30.00 30.00 67.50 2.49 123,880.22 - - - - 123,880.22 L. Bajo
6 Kayu Klas III (Lokal) M³ 3.50 0.80 1.50 20.00 30.00 308,324.11 4.50 3.00 30.00 30.00 67.50 2.49 123,880.22 - - - - 123,880.22 L. Bajo
7 Bambu Diameter 6 - 8 / 600 cm Btg 350.00 0.80 1.50 20.00 30.00 308,324.11 4.50 3.00 30.00 30.00 67.50 248.89 1,238.80 - - - - 1,238.80 L. Bajo

8 Kayu Dolken/Perancah (Ø 8-10 ) cm, P= 4 m btg 350.00 0.80 1.50 20.00 30.00 308,324.11 4.50 3.00 30.00 30.00 67.50 248.89 1,238.80 - - - - 1,238.80 L. Bajo

9 Ready Mix K-300 M³ 4.00 0.80 5.00 20.00 30.00 308,324.11 15.00 10.00 30.00 30.00 85.00 2.26 136,497.65 - - - - 136,497.65 L. Bajo
10 Ready Mix K-250 M³ 4.00 0.80 5.00 20.00 30.00 308,324.11 15.00 10.00 30.00 30.00 85.00 2.26 136,497.65 - - - - 136,497.65 L. Bajo
11 Ready Mix K-200 M³ 4.00 0.80 5.00 20.00 30.00 308,324.11 15.00 10.00 30.00 30.00 85.00 2.26 136,497.65 - - - - 136,497.65 L. Bajo
12 Batu Pecah 2 - 3 cm M³ 4.00 0.80 10.00 20.00 30.00 308,324.11 30.00 20.00 20.00 5.00 75.00 2.56 120,439.11 - - - - 120,439.11 L. Bajo
13 Batu Belah/Batu Kali M³ 4.00 0.80 10.00 20.00 30.00 308,324.11 30.00 20.00 20.00 5.00 75.00 2.56 120,439.11 - - - - 120,439.11 L. Bajo
14 Pasir beton M³ 4.00 0.80 40.00 20.00 30.00 308,324.11 120.00 80.00 20.00 5.00 225.00 0.85 361,317.32 - - - - 361,317.32 Wae Longge
15 Pasir Pasang M³ 4.00 0.80 40.00 20.00 30.00 308,324.11 120.00 80.00 20.00 5.00 225.00 0.85 361,317.32 - - - - 361,317.32 Wae Longge
16 Pasir Urug M³ 4.00 0.80 40.00 20.00 30.00 308,324.11 120.00 80.00 20.00 5.00 225.00 0.85 361,317.32 - - - - 361,317.32 Nanga Nae
17 Timbunan Sirtu Kali M³ 4.00 0.80 10.00 20.00 30.00 308,324.11 30.00 20.00 20.00 5.00 75.00 2.56 120,439.11 - - - - 120,439.11 L. Bajo
18 Tanah Urug (Cadas) M³ 4.00 0.80 10.00 20.00 30.00 308,324.11 30.00 20.00 20.00 5.00 75.00 2.56 120,439.11 - - - - 120,439.11 L. Bajo
19 Ijuk Kg 7,000.00 0.80 10.00 20.00 30.00 308,324.11 30.00 20.00 20.00 5.00 75.00 4,480.00 68.82 - - - - 68.82 L. Bajo
20 Tali Ijuk Kg 7,000.00 0.80 10.00 20.00 30.00 308,324.11 30.00 20.00 20.00 5.00 75.00 4,480.00 68.82 - - - - 68.82 L. Bajo
21 Air Kerja Liter 5,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 5.00 40.00 6,000.00 51.39 - - - - 51.39 L. Bajo
22 Bata Merah Bh 4,000.00 0.80 40.00 20.00 30.00 308,324.11 120.00 80.00 60.00 60.00 320.00 600.00 513.87 - - - - 513.87 L. Bajo
23 Bataco Uk. 12 x 15 x 25 cm Bh 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 384.00 802.93 - - - - 802.93 L. Bajo
24 Stone Block/Paving Block tebal 8 cm M² 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 384.00 802.93 - - - - 802.93 L. Bajo
25 Roster uk. 20 x 20 x 8 cm Btg 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 384.00 802.93 - - - - 802.93 L. Bajo
II BAHAN NON LOKAL
A Aluminium dan Besi
Aluminium Composit Panel ( ACP ) Cutting
1 Lbr 300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 221.54 1,391.74 4.00 0.007 4.00 0.007 1,391.75 L. Bajo
Laser Sparkling tebal 4 mm setara

Alumanium Foil/Sisalation Double Side bahan


2 M' 13,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 9,600.00 32.12 4.00 0.000 4.00 0.000 32.12 L. Bajo
dasar plastik
3 Metal Cutting Laser tebal 3 mm setara M² 300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 221.54 1,391.74 4.00 0.007 4.00 0.007 1,391.75 L. Bajo
4 Pintu, Jendela dan Boven Aluminium M' 300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 221.54 1,391.74 4.00 0.007 4.00 0.007 1,391.75 L. Bajo
5 Huruf timbul Acrylic t=5mm Cm 13,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 9,600.00 32.12 4.00 0.000 4.00 0.000 32.12 L. Bajo
Kosen Aluminium Alexindo 4 inch Coating
6 M' 300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 221.54 1,391.74 4.00 0.007 4.00 0.007 1,391.75 L. Bajo
5/10 ''

Roof Bottom/Bottom Cord Bracing /Reng 33 -


7 M' 300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 221.54 1,391.74 4.00 0.007 4.00 0.007 1,391.75 L. Bajo
0.45 Klas A

8 Baja Ringan / Main truss C - 75 - 75 Klas A M' 300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 221.54 1,391.74 4.00 0.007 4.00 0.007 1,391.75 L. Bajo

9 Alluminium strip lebar 8 cm M' 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 738.46 417.52 4.00 0.002 4.00 0.002 417.53 L. Bajo
10 List Plafon Shadowline/Tali air M' 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 738.46 417.52 4.00 0.002 4.00 0.002 417.53 L. Bajo
11 C Stud Metal M 300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 221.54 1,391.74 4.00 0.007 4.00 0.007 1,391.75 L. Bajo
12 U Channel (Uranner) M 300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 221.54 1,391.74 4.00 0.007 4.00 0.007 1,391.75 L. Bajo
13 Conctrete Bracket/ Angle Clip Bh 3,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 2,215.38 139.17 4.00 0.001 4.00 0.001 139.18 L. Bajo
14 List/Profil Kaca Elaxindo Warna M' 3,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 2,215.38 139.17 4.00 0.001 4.00 0.001 139.18 L. Bajo

15 Frame Alumunium Alexindo 30/70 -100 MM M' 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 738.46 417.52 4.00 0.002 4.00 0.002 417.53 L. Bajo

16 Rangka metal stud (MS 100) uk.100 x 34 mm M' 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 738.46 417.52 4.00 0.002 4.00 0.002 417.53 L. Bajo

17 Rangka U runner (U 100) uk.100 x 30 mm M' 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 738.46 417.52 4.00 0.002 4.00 0.002 417.53 L. Bajo
18 Kawat Beton/ikat Kg 2,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,476.92 208.76 4.00 0.001 4.00 0.001 208.76 L. Bajo
19 Kawat Las RB 26 Kg 2,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,476.92 208.76 4.00 0.001 4.00 0.001 208.76 L. Bajo

20 (Wiremesh) M6 x 2.1M x 5.4M (SNI-SERTIF) Lbr 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 2,584.62 119.29 4.00 0.001 4.00 0.001 119.29 L. Bajo

21 (Wiremesh) M8 x 2.1M x 5.4M (SNI-SERTIF) Lbr 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 2,584.62 119.29 4.00 0.001 4.00 0.001 119.29 L. Bajo

(Wiremesh) M10 x 2.1M x 5.4M (SNI-


22 Lbr 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 2,584.62 119.29 4.00 0.001 4.00 0.001 119.29 L. Bajo
SERTIF)

Jaring kawat baja dilas Standart SNI Uk.2,1 m


23 Kg 36.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 26.58 11,597.84 4.00 0.056 4.00 0.056 11,597.95 L. Bajo
x 5,4 m M Ø 10 mm
24 Kawat Jaring Galvanis M² 36.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 26.58 11,597.84 4.00 0.056 4.00 0.056 11,597.95 L. Bajo
Pengadaan dan Pemasangan Rilling Tangga
25 M² 36.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 26.58 11,597.84 4.00 0.056 4.00 0.056 11,597.95 L. Bajo
besi hollow + Plat besi 2 mm
26 Hollow Besi 40x40 Btg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,846.15 167.01 4.00 0.001 4.00 0.001 167.01 L. Bajo
27 Hollow Besi 20/40 Btg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,846.15 167.01 4.00 0.001 4.00 0.001 167.01 L. Bajo
28 Hollow Besi 50x50x2 mm Btg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,846.15 167.01 4.00 0.001 4.00 0.001 167.01 L. Bajo
29 Hollow Besi 40x60x2 mm Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,846.15 167.01 4.00 0.001 4.00 0.001 167.01 L. Bajo
30 Pipa Galvanis 1/2 Dim Btg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,846.15 167.01 4.00 0.001 4.00 0.001 167.01 L. Bajo
31 Hollow 50x10 Btg 150.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 110.77 2,783.48 4.00 0.013 4.00 0.013 2,783.51 L. Bajo
32 Hollow 35.35. 2 mm Zincoromate M' 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,846.15 167.01 4.00 0.001 4.00 0.001 167.01 L. Bajo
33 Hollow 15 . 35 . 2 mm Zincoromate M' 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,846.15 167.01 4.00 0.001 4.00 0.001 167.01 L. Bajo
34 Hollow 35.35. 2 mm Galvanum M' 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,846.15 167.01 4.00 0.001 4.00 0.001 167.01 L. Bajo
35 Hollow 15 . 35 . 2 mm Galvanum M' 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,846.15 167.01 4.00 0.001 4.00 0.001 167.01 L. Bajo
36 Hollow Galvalum 40x40 Btg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,846.15 167.01 4.00 0.001 4.00 0.001 167.01 L. Bajo
37 Hollow Galvalum 20/40 Btg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 30.00 30.00 65.00 1,846.15 167.01 4.00 0.001 4.00 0.001 167.01 L. Bajo
38 Besi Ulir Ø 19 mm; P= 12 M Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 20.00 85.00 1,976.47 156.00 4.00 0.001 4.00 0.000 156.00 L. Bajo
39 Besi Ulir Ø 16 mm; P= 12 M Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 20.00 85.00 1,976.47 156.00 4.00 0.001 4.00 0.000 156.00 L. Bajo
40 Besi Ulir Ø 13 mm; P= 12 M Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 20.00 85.00 1,976.47 156.00 4.00 0.001 4.00 0.000 156.00 L. Bajo
41 Besi Polos Ø 12 mm; P 12 M Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 20.00 85.00 1,976.47 156.00 4.00 0.001 4.00 0.000 156.00 L. Bajo
42 Besi Polos Ø 10 mm; P = 12 M Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 20.00 85.00 1,976.47 156.00 4.00 0.001 4.00 0.000 156.00 L. Bajo
43 Besi polos Ø 8 mm; P=12 M Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 20.00 85.00 1,976.47 156.00 4.00 0.001 4.00 0.000 156.00 L. Bajo

44 Pipa Hawa ( P=1.00 M ) GIP 1.5" + Complit Kg 350.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 20.00 85.00 197.65 1,559.97 4.00 0.011 4.00 0.004 1,559.99 L. Bajo

B Pengisi Lantai dan Dinding


Bata Ringan AAC (Autoclaved Aerated
1 M³ 3.50 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1.34 229,407.82 4.00 1.142857 4.00 1.143 229,410.11 L. Bajo
Concrete) uk. 60 x 20 x 10 cm

Paving Block Hexagon Diameter 20 cm Tebal


2 M² 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 384.00 802.93 4.00 0.004 4.00 0.004 802.94 L. Bajo
8 cm
3 Roster Beton 20x20 Bh 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 384.00 802.93 4.00 0.004 4.00 0.004 802.94 L. Bajo
4 Granitile 60x60 Polish Bh 120.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 46.08 6,691.06 4.00 0.033 4.00 0.033 6,691.13 L. Bajo
5 Granitile 60x60 Unpolish Bh 120.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 46.08 6,691.06 4.00 0.033 4.00 0.033 6,691.13 L. Bajo
6 Keramik 50x50 Unpolish Dos 150.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 57.60 5,352.85 4.00 0.027 4.00 0.027 5,352.90 L. Bajo
7 Keramik 60x60 Polish Dos 120.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 46.08 6,691.06 4.00 0.033 4.00 0.033 6,691.13 L. Bajo
8 Keramik 60x60 Unpolish Dos 120.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 46.08 6,691.06 4.00 0.033 4.00 0.033 6,691.13 L. Bajo
9 Keramik 30x30 ####### Dos 240.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 92.16 3,345.53 4.00 0.017 4.00 0.017 3,345.56 L. Bajo
10 Keramik Ukuran 40 x 40 cm warna/motif Dos 200.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 76.80 4,014.64 4.00 0.020 4.00 0.020 4,014.68 L. Bajo
11 Keramik ukuran 60 x 60 cm Warna/motif Dos 120.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 46.08 6,691.06 4.00 0.033 4.00 0.033 6,691.13 L. Bajo
12 Keramik Anti Slip Ukuran 40 x 40 cm Dos 200.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 76.80 4,014.64 4.00 0.020 4.00 0.020 4,014.68 L. Bajo
13 Keramik Anti Slip ukuran 60 x 60 cm Dos 120.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 46.08 6,691.06 4.00 0.033 4.00 0.033 6,691.13 L. Bajo
14 Keramik Ukuran 30 x 30 cm warna/motif Bh 240.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 92.16 3,345.53 4.00 0.017 4.00 0.017 3,345.56 L. Bajo
15 Plint Keramik 10x30 Btg 11,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 4,224.00 72.99 4.00 0.000 4.00 0.000 72.99 L. Bajo
16 Plint Keramik 10x40 Btg 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
17 Plint Keramik 10x50 Btg 9,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,456.00 89.21 4.00 0.000 4.00 0.000 89.22 L. Bajo
18 Plint Keramik 10x60 Btg 8,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,072.00 100.37 4.00 0.001 4.00 0.001 100.37 L. Bajo
19 Granit 60 x 60 CM Dos 200.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 76.80 4,014.64 4.00 0.020 4.00 0.020 4,014.68 L. Bajo
20 Granit Anti Slip Ukuran 60 x 60 CM Dos 200.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 76.80 4,014.64 4.00 0.020 4.00 0.020 4,014.68 L. Bajo

21 Plint Granit Ukuran 10 x 60 cm Timbul Motif Btg 8,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,072.00 100.37 4.00 0.001 4.00 0.001 100.37 L. Bajo

22 Vynil lantai , anti bacterial - 3.50 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1.34 229,407.82 4.00 1.143 4.00 1.143 229,410.11 L. Bajo
23 Rumput Jepang M² 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
24 Partisi Toilet Cubicle Phenolic+Aksesoris M² 400.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 153.60 2,007.32 4.00 0.010 4.00 0.010 2,007.34 L. Bajo

25 Karpet Karet Ramp Motif Koin Tebal 4 mm M 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
C Besi Baja -
Besi Baja H Beam Panjang 12 meter -
1 L 100x100x6x8 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
2 L 125x125x5x7 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
3 L 125x125x6.5×9 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
4 L 150x150x7x10 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
5 L 175x175x7x11 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
6 L 200x200x8x12 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
7 L 250x250x9x14 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
8 L 300x300x10x15 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
9 L 250x350x12x19 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
10 L 400x400x13x21 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
Besi Baja WF ( Wide Flange ) Panjang 12
-
meter
1 WF 100X50X5 X7 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
2 WF 125X60X6 X8 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
3 WF 148X100X6X9 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
4 WF 150X75X5X7 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
5 WF 175X90X5X8 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
6 WF 198X99X4,5X7 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
7 WF 200X100X3,2X4,5 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
8 WF 200X100X5,5X8 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
9 WF 248X124X5X8 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
10 WF 250X125X6X9 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
11 WF 298X149X6X8 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
12 WF 300X150X6,5X9 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
13 WF 346X174X6X9 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
14 WF 350X175X7X11 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
15 WF 396X199X7X11 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
16 WF 400X200X8 X13 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
17 WF 446X199X8X12 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
18 WF 450X200X9X14 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
19 WF 500X200X10X16 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
20 WF 588X300X10X16 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
21 WF 600X200X11X17 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
22 WF 700X300X13X24 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
23 WF 800X300X14X26 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
Besi Baja kanal C/ CNP Panjang 6 meter -
1 L 60X30X10X1,6 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
2 L 75X35X15X1,6 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
3 L 75 X45X15X1,6 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
4 L 75X45X15X2,3 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
5 L 100X50X20X1,6 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
6 L 100X50X20X2,3 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
7 L 100X50X20X3,2 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
8 L 125X50X20X2,3 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
9 L 125X50X20X3,2 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
10 L 150X50X20X2,3 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
11 L 150X50X20X3,2 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
12 L 150X65X20X2,3 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
13 L 150X65X20X3,2 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
14 L 200X75X20X3,2 Kg 2,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 960.00 321.17 4.00 0.002 4.00 0.002 321.17 L. Bajo
D Penutup Atap
Atap Bitumen gelombang Monolayer 3 mm
1 Lbr 450.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 172.80 1,784.28 4.00 0.009 4.00 0.009 1,784.30 L. Bajo
Onduline
2 Nok / Ridge Onduline Lbr 1,400.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 537.60 573.52 4.00 0.003 4.00 0.003 573.53 L. Bajo
3 Atap Spandek 0.3 Lbr 450.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 172.80 1,784.28 4.00 0.009 4.00 0.009 1,784.30 L. Bajo
4 Atap Policarbonat 5 mm Twinlite Lbr 450.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 172.80 1,784.28 4.00 0.009 4.00 0.009 1,784.30 L. Bajo
5 Profil Sambungan Policarbonat 5 mm Lbr 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
6 Nok Bubungan Spandek L=30 M' 1,400.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 537.60 573.52 4.00 0.003 4.00 0.003 573.53 L. Bajo
7 Talang Jurai 0.4/3m M' 1,400.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 537.60 573.52 4.00 0.003 4.00 0.003 573.53 L. Bajo
8 Atap Multiroof Berpasir Lbr 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
9 Jurai atap dan Nok Multiroof Berpasir Pcs 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
10 Wall Flashing ( rainbow roof ) M' 2,300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 883.20 349.10 4.00 0.002 4.00 0.002 349.10 L. Bajo
E Penutup Plafon
1 List PVC Btg 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 384.00 802.93 4.00 0.004 4.00 0.004 802.94 L. Bajo
2 Plafon PVC 8 mm M' 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
3 List Gypsum M' 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 384.00 802.93 4.00 0.004 4.00 0.004 802.94 L. Bajo
4 Papan Kalsiplang Board tebal 9 MM M' 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
5 Papan GRC tebal 6 mm M² 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
6 Papan GRC tebal 10 mm M² 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
7 Gypsum Ex. Elephant tebal 9 MM Lbr 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
8 Kalsi Board tbl 6 mm Lbr 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
F Skrup & Paku
1 Paku rivet Bh 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
2 Top Plat/Mur Plate Bh 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
3 Speedy Screw bh 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
4 Dinabolt/Ramset dia 12 x 120 mm Klas A Bh 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
Self drilling screw dia 6 x 20 mm ( truss screw
5 Bh 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
) Klas A

Self drilling screw dia 4 x 16 mm ( Roof


6 Bh 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
bottom ) Klas A
7 Sekrup F i s e r 3" Bh 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
8 Skrup Fixer Bh 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
9 Screw Pcs 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
10 Ramset/Dinabolt Bh 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
11 Skrup Metal Bh 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
12 Paku skrup Gypsum Dos 11,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 4,224.00 72.99 4.00 0.000 4.00 0.000 72.99 L. Bajo
13 Paku skrup Bh 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
14 Paku Seng Kg 11,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 4,224.00 72.99 4.00 0.000 4.00 0.000 72.99 L. Bajo
15 Paku Ukuran 1,5 cm Kg 11,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 4,224.00 72.99 4.00 0.000 4.00 0.000 72.99 L. Bajo
16 Paku Ukuran 2 cm Kg 11,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 4,224.00 72.99 4.00 0.000 4.00 0.000 72.99 L. Bajo
17 Paku Ukuran 2,5 cm Kg 11,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 4,224.00 72.99 4.00 0.000 4.00 0.000 72.99 L. Bajo
18 Paku Ukuran 3 cm Kg 11,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 4,224.00 72.99 4.00 0.000 4.00 0.000 72.99 L. Bajo
19 Paku Ukuran 5-12 cm Kg 11,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 4,224.00 72.99 4.00 0.000 4.00 0.000 72.99 L. Bajo
G Cat
1 Sabun Besi Bh 3,000,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,152,000.00 0.27 4.00 0.000 4.00 0.000 0.27 L. Bajo
2 Soda Api Ltr 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
3 Cat Besi Delta Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo

4 Cat Kayu Mengkilat setara Emco Polibest Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo

5 Cat Tembok Jotun Interior setara Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
6 Cat Tembok Jotun Exterior setara Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
7 Cat Kayu ex. Emco Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
8 Cat Tembok Paragon Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
9 Cat Menie Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
10 Dumpul/plamir Skim Coat 20 Kg/Big Lion Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
11 Kwas 4 inch Bh 7,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 2,688.00 114.70 4.00 0.001 4.00 0.001 114.71 L. Bajo
12 Lem Kayu Aibon Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
13 Minyak Cat/ Thiner Spesial Avian Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
14 Water Proof/ Aquaproof Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
15 Wood Filler Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
16 Kuas Roll Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
H Pintu Jendela dan Aksesoris
1 Gerendel Kuping Jendela set 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001143 4.00 0.001143 229.41 L. Bajo
2 Engsel Pintu 4" Paori set 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
3 Door Closer Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
4 Lockcase Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
5 Clinder Look Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
6 Handle on Roses (HRE) set 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
7 Handle Sliding set 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
8 Pull Handle 60 Cm set 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
9 Grendel Biasa bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
10 Casement set 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
11 Floor hinges mutu tinggi Psg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
12 patch Fitting ambang Bawah Psg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
13 patch Fitting ambang Atas Psg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
14 Kosen Aluminium (berwarna/anodized) 4' M' 150.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 57.60 5,352.85 4.00 0.027 4.00 0.027 5,352.90 L. Bajo
Pintu Swing (Inc. Kusen, Daun Pintu Dan
15 M' 150.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 57.60 5,352.85 4.00 0.027 4.00 0.027 5,352.90 L. Bajo
Aks.)

Jendela Swing UPVC (Incl. Kusen, Daun


16 M' 150.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 57.60 5,352.85 4.00 0.027 4.00 0.027 5,352.90 L. Bajo
Jendela Dan Aks.)

Jendela Sliding UPVC (Incl. Kusen, Daun


17 M' 150.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 57.60 5,352.85 4.00 0.027 4.00 0.027 5,352.90 L. Bajo
Jendela Dan Aks.)

Jendela Kaca Mati UPVC (Incl. Kusen, Daun


18 M' 150.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 57.60 5,352.85 4.00 0.027 4.00 0.027 5,352.90 L. Bajo
Jendela Dan Aks.)

19 Daun Pintu Alumunium Jalusi Kamar mandi M2 150.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 57.60 5,352.85 4.00 0.027 4.00 0.027 5,352.90 L. Bajo

20 Braket Acp Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
21 Handle Jendela Alumunium bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
22 Flush Handle Stainless Stell bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
23 Taco TH 325-Brown Kraftwood M² 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
24 Gerendel Pintu Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
25 Kunci Tanam ex. Paori Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
26 Hengsel Pintu 4 " Paori Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
27 Hengsel Jendela 3" Paori Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
28 Handle Pintu Set 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
29 Kait Angin Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
30 Door Closer Set 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
31 Floor hinges ; Kualitas Baik ( No. 1) Set 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
32 Overpanel ; Kualitas Baik ( No. 1) Set 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
I Kaca
1 Kaca Tempered tebal 12 mm M² 50.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 19.20 16,058.55 4.00 0.080 4.00 0.080 16,058.71 L. Bajo
2 Kaca Tempered tebal 10 mm M² 50.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 19.20 16,058.55 4.00 0.080 4.00 0.080 16,058.71 L. Bajo
3 Kaca Tempered tebal 8 mm M² 50.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 19.20 16,058.55 4.00 0.080 4.00 0.080 16,058.71 L. Bajo
4 Kaca Panasap Glass 5 mm M² 80.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 30.72 10,036.59 4.00 0.050 4.00 0.050 10,036.69 L. Bajo
5 Kaca Polos tebal 6 mm (clear) M² 80.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 30.72 10,036.59 4.00 0.050 4.00 0.050 10,036.69 L. Bajo
6 Kaca Polos tebal 8 mm (clear) M² 80.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 30.72 10,036.59 4.00 0.050 4.00 0.050 10,036.69 L. Bajo
7 Kaca tebal 8 mm (Dark Blue) M² 80.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 30.72 10,036.59 4.00 0.050 4.00 0.050 10,036.69 L. Bajo
8 Kaca tebal 6 mm (Dark Blue) M² 80.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 30.72 10,036.59 4.00 0.050 4.00 0.050 10,036.69 L. Bajo
9 Kopling Besar M 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
10 Silikon/sealant Bh 5,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,920.00 160.59 4.00 0.001 4.00 0.001 160.59 L. Bajo
J Semen
1 Semen Portland (40 Kg) Zak 250.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 96.00 3,211.71 4.00 0.016 4.00 0.016 3,211.74 L. Bajo
2 Semen warna Kg 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
3 Semen MU 301 Kg 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
4 Semen MU 270 (Untuk acian ) Kg 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
5 Semen MU 380 ( Untuk Perekat Bata ) Kg 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
6 Sika Waterproofing - 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
7 Politur Jadi K Indian Ltr 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
8 Cornice/Compound Zak 250.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 96.00 3,211.71 4.00 0.016 4.00 0.016 3,211.74 L. Bajo
9 Amplas/Kertas Pasir Lbr 7,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 2,688.00 114.70 4.00 0.001 4.00 0.001 114.71 L. Bajo
10 Jointing Coumpound Kg 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
11 Joint Tape M 3,500,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344,000.00 0.23 4.00 0.000 4.00 0.000 0.23 L. Bajo
12 Lem Raja wali Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
13 Alat bantu ( Mesin Bor Listrik) Genset Jam 1.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 0.38 802,927.37 4.00 4.000 4.00 4.000 802,935.37 L. Bajo
14 Alat Sambung Bh 1.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 0.38 802,927.37 4.00 4.000 4.00 4.000 802,935.37 L. Bajo
15 Multipleks 9 mm Lbr 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
16 Plywood tebal 9 mm Lbr 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
17 Tripleks 5 mm Lbr 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
18 Calsium Kg 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
19 Cornice/Compound Kg 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
20 Colton Plaster Bh 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
21 Tepung Gypsum Kg 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
K Sanitair
1 Kloset Jongkok INA Bh 100.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 38.40 8,029.27 4.00 0.040 4.00 0.040 8,029.35 L. Bajo
Pas Kloset Duduk American
2 Standart complit Midle Sofer + Bh 50.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 19.20 16,058.55 4.00 0.080 4.00 0.080 16,058.71 L. Bajo
Tabung
3 Kloset Duduk Tanpa Tabung INA Bh 50.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 19.20 16,058.55 4.00 0.080 4.00 0.080 16,058.71 L. Bajo
4 Anodised Aluminium U/F Channel 12 mm M 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 384.00 802.93 4.00 0.004 4.00 0.004 802.94 L. Bajo
5 Aluminium Top Rail M 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 384.00 802.93 4.00 0.004 4.00 0.004 802.94 L. Bajo
6 Coat Hook Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
7 Door Knob Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
8 Thumb-Turn & Indikator Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
9 Gravity Hinge Psg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
10 Bottom Pedestal Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
11 Polyamide Top Rail End Cap Bh 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 384.00 802.93 4.00 0.004 4.00 0.004 802.94 L. Bajo
12 Aluminium Door Stopper Channel M 1,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 384.00 802.93 4.00 0.004 4.00 0.004 802.94 L. Bajo
13 GRC Board 12 mm Lbr 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
14 Water Heater 15 Liter Bh 50.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 19.20 16,058.55 4.00 0.080 4.00 0.080 16,058.71 L. Bajo
15 Shower + Kran air Double Pipe Bh 50.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 19.20 16,058.55 4.00 0.080 4.00 0.080 16,058.71 L. Bajo
Wastafel Lengkap Asesories Amerikan
16 Bh 100.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 38.40 8,029.27 4.00 0.040 4.00 0.040 8,029.35 L. Bajo
standart
17 Urinoir American Standar Bh 100.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 38.40 8,029.27 4.00 0.040 4.00 0.040 8,029.35 L. Bajo
18 Dispenser sabun manual/Hand Soap Oil Bh 500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 192.00 1,605.85 4.00 0.008 4.00 0.008 1,605.87 L. Bajo
19 Kotak Tisu Bh 17,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 6,720.00 45.88 4.00 0.000 4.00 0.000 45.88 L. Bajo
20 Hanger Besi Stenliss Bh 17,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 6,720.00 45.88 4.00 0.000 4.00 0.000 45.88 L. Bajo
21 Sofer Bh 17,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 6,720.00 45.88 4.00 0.000 4.00 0.000 45.88 L. Bajo
22 Floor Draine Bh 17,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 6,720.00 45.88 4.00 0.000 4.00 0.000 45.88 L. Bajo
23 Stop kran Ø 1" Bh 17,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 6,720.00 45.88 4.00 0.000 4.00 0.000 45.88 L. Bajo
24 Stop Kran Air Biasa PVC Ø 1/2" Bh 17,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 6,720.00 45.88 4.00 0.000 4.00 0.000 45.88 L. Bajo
Handrail Paloma BAP 1524 Corina BTH GRB
25 unit 17,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 6,720.00 45.88 4.00 0.000 4.00 0.000 45.88 L. Bajo
= 50CM

26 Pipa Hawa ( P=1.00 M ) GIP 1.5" + Complit Bh 1,300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 499.20 617.64 4.00 0.003 4.00 0.003 617.64 L. Bajo

27 Pipa PVC AW ø 1/2" M' 21,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 8,064.00 38.23 4.00 0.000 4.00 0.000 38.24 L. Bajo
28 Pipa PVC AW ø 3/4" M' 16,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 6,144.00 50.18 4.00 0.000 4.00 0.000 50.18 L. Bajo
29 Pipa PVC AW ø 1" M' 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
30 Pipa PVC AW ø 1 1/2" M' 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
31 Pipa PVC AW ø 4" M' 1,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 576.00 535.28 4.00 0.003 4.00 0.003 535.29 L. Bajo
32 Pipa PVC AW ø 2 " M' 5,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,920.00 160.59 4.00 0.001 4.00 0.001 160.59 L. Bajo
33 Pipa PVC AW ø 3 " M' 2,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 768.00 401.46 4.00 0.002 4.00 0.002 401.47 L. Bajo
34 Isolasi Pipa/Sealtape Bh 70,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 26,880.00 11.47 4.00 0.000 4.00 0.000 11.47 L. Bajo
35 Clean Out Ø 3" (Stainless stell) Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
L Mekanikal Elektrikal
1 Tee dos ( Listrik ) Bh 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo

2 Biaya Penyambungan Daya Listrik 23000 Watt Watt

3 Top patch fitting ; Kualitas Baik ( No. 1) Broco Set 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo

4 Bottom patch fitting ; Kualitas Baik ( No. 1) Set 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo
Bottom patch lock + cylinder ; Kualitas Baik (
5 Set 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo
No. 1)

6 Pull handle ; Kualitas Baik ( No. 1) Set 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo

Kabel Listrik NYM 3 x 2.5 mm ( Standart


7 M' 25,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 9,600.00 32.12 4.00 0.000 4.00 0.000 32.12 L. Bajo
PLN ) Eterna

Kabel Listrik NYM 2 x 2.5 mm ( Standart


8 M' 21,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 8,064.00 38.23 4.00 0.000 4.00 0.000 38.24 L. Bajo
PLN ) Eterna
9 Pipa Listrik 5/8 " Btg 5,250.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 2,016.00 152.94 4.00 0.001 4.00 0.001 152.94 L. Bajo
10 Saklar Tunggal Bronco Super Bh 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo
11 Saklar Ganda Bronco Super Bh 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo
12 Stop Contak Bronco Super Bh 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo
13 Fitting Tanam (Brocco/stara ) Bh 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo
14 Lampu Downlight 18 Watt Bh 14,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 5,376.00 57.35 4.00 0.000 4.00 0.000 57.35 L. Bajo
15 Lampu Philips Spiral 20 Watt Bh 14,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 5,376.00 57.35 4.00 0.000 4.00 0.000 57.35 L. Bajo
16 Fitting Tempel ( Broco /Stara ) Bh 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo
17 MCB Group 16 A ex Broco Bh 5,300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 2,035.20 151.50 4.00 0.001 4.00 0.001 151.50 L. Bajo
18 MCB Group 6 A ex Broco Bh 5,300.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 2,035.20 151.50 4.00 0.001 4.00 0.001 151.50 L. Bajo

19 Panel Box Control Server uk. 40x50x20 cm Unit 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo

20 Panel Box Control Server uk. 20x30x12 cm Bh 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo

21 Lampu panel box control server Bh 70,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 26,880.00 11.47 4.00 0.000 4.00 0.000 11.47 L. Bajo
22 Plat rell MCB Box Control Bh 28,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 10,752.00 28.68 4.00 0.000 4.00 0.000 28.68 L. Bajo
23 Panel Box 4 MCB Bh 5,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,920.00 160.59 4.00 0.001 4.00 0.001 160.59 L. Bajo

24 Lampu Emergency Nicad Batteray 20 Watt Bh 5,800.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 2,227.20 138.44 4.00 0.001 4.00 0.001 138.44 L. Bajo

Lampu RM Artolite Passat CL 2x18 watt M5


25 Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
White; Out Bow
26 L Bow Ø 5/8" Bh 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo
27 Klem pipa Listrik Ø 5/8" Bh 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo
28 Fhiser Bh 5,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,920.00 160.59 4.00 0.001 4.00 0.001 160.59 L. Bajo
29 Las Dop Listrik Bh 5,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,920.00 160.59 4.00 0.001 4.00 0.001 160.59 L. Bajo
30 Mata tombak EF, Bh 4,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,536.00 200.73 4.00 0.001 4.00 0.001 200.73 L. Bajo
31 pipa PVC AW Ø 1" M' 10,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 3,840.00 80.29 4.00 0.000 4.00 0.000 80.29 L. Bajo
32 Kabel BC 10 mm, dengan Pipa Konduit M' 21,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 8,064.00 38.23 4.00 0.000 4.00 0.000 38.24 L. Bajo
33 Grounding didalam arde Unit 3,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,152.00 267.64 4.00 0.001 4.00 0.001 267.65 L. Bajo
34 Kotak teks dan acceroies Bh 580.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 222.72 1,384.36 4.00 0.007 4.00 0.007 1,384.37 L. Bajo
35 AC Panasonic 2 1/2 PK Bh 100.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 38.40 8,029.27 4.00 0.040 4.00 0.040 8,029.35 L. Bajo
36 AC Panasonic 2 PK Bh 100.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 38.40 8,029.27 4.00 0.040 4.00 0.040 8,029.35 L. Bajo
37 AC Panasonic 1 1/2 PK Bh 100.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 38.40 8,029.27 4.00 0.040 4.00 0.040 8,029.35 L. Bajo
38 AC Panasonic 1 PK Bh 100.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 38.40 8,029.27 4.00 0.040 4.00 0.040 8,029.35 L. Bajo
39 AC Panasonic 3/4 PK Bh 100.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 38.40 8,029.27 4.00 0.040 4.00 0.040 8,029.35 L. Bajo
40 AC Panasonic 1/2 PK Bh 100.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 38.40 8,029.27 4.00 0.040 4.00 0.040 8,029.35 L. Bajo
41 Gas Refrigerent ( Fereon AC ) R22/R407 Kg 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
Dudukan Unit outdoor, bracket, Penggantung
42 Set 35,000.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 13,440.00 22.94 4.00 0.000 4.00 0.000 22.94 L. Bajo
dll
Sewa alat-alat bantu, steger kerja, Pengukuran
43 Ls
dll

Pemasangan Pipa Refrigerant, (in-out), Pipa


44 Unit 350.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 134.40 2,294.08 4.00 0.011 4.00 0.011 2,294.10 L. Bajo
Drain AC PVC AW, Isolasi Poliurethane
45 Handle Jendela Bh 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
46 Bak Cuci Satinless Steel Bh 150.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 57.60 5,352.85 4.00 0.027 4.00 0.027 5,352.90 L. Bajo
47 Bidet /Sofer + Selang Move Set 7,700.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 2,956.80 104.28 4.00 0.001 4.00 0.001 104.28 L. Bajo
48 Profil Tank Pinguin 2000 Liter Stainless Bh 2.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 10.00 10.00 25.00 3.84 80,292.74 4.00 0.333 4.00 0.333 80,293.40 L. Bajo
49 Sanyo Sumur Dangkal ( Automatic ) Bh 50.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 19.20 16,058.55 4.00 0.080 4.00 0.080 16,058.71 L. Bajo
50 Water Booster Bh 50.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 19.20 16,058.55 4.00 0.080 4.00 0.080 16,058.71 L. Bajo
51 Grease Trap Stainless Bh 50.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 19.20 16,058.55 4.00 0.080 4.00 0.080 16,058.71 L. Bajo
PEKERJAAN PENARIKAN KABEL -
KABEL FEEDER -
1 Kabel FRC 4 x 10 mm2 M L. Bajo
2 Kabel FRC 4 x 150 mm2 M L. Bajo
3 Kabel FRC 4 x 70 mm2 M L. Bajo
4 Kabel FRC 4 x 4 mm2 M L. Bajo
5 Kabel FRC 4 x 16 mm2 M L. Bajo
6 Kabel NYFGbY 4 x 240 mm2 M L. Bajo
7 Kabel NYY 4 x 240 mm2 M L. Bajo
8 Kabel NYFGbY 4 x 70 mm2 M L. Bajo
9 Kabel NYFGbY 4 x 35 mm2 M L. Bajo
10 Kabel NYFGbY 4 x 25 mm2 M L. Bajo
11 Kabel NYFGbY 4 x 16 mm2 M L. Bajo
12 Kabel NYFGbY 4 x 10 mm2 M L. Bajo
13 Kabel NYFGbY 4 x 6 mm2 M L. Bajo
14 Kabel NYFGbY 4 x 4 mm2 M L. Bajo
15 Kabel NYY 4 x 95 mm2 M L. Bajo
16 Kabel NYY 4 x 50 mm2 M L. Bajo
17 Kabel FRC 4 x 50 mm2 M L. Bajo
18 Kabel NYY 4 x 35 mm2 M L. Bajo
19 Kabel NYY 4 x 25 mm3 M L. Bajo
20 Kabel NYY 4 x 16 mm2 M L. Bajo
21 Kabel NYY 4 x 10 mm2 M L. Bajo
22 Kabel NYY 4 x 6 mm2 M L. Bajo
23 Kabel NYY 4 x 4 mm2 M L. Bajo
KABEL INSTALASI - -
1 Kabel NYFGbY 2 x 2.5 mm2 M L. Bajo
2 Kabel NYFGbY 3 x 2,5 mm3 M L. Bajo
3 Kabel NYFGbY 2 x 6 mm4 M L. Bajo
4 Kabel NYA 2 x 2.5 mm2 M L. Bajo
5 Kabel NYA 3 x 2.5 mm2 M L. Bajo
6 Kabel NYA 70 mm2 M L. Bajo
7 Kabel NYY 3 x 2,5 mm2 M L. Bajo
8 Kabel NYY 3 x 4 mm2 M L. Bajo
9 Kabel NYM 3 x 2,5 mm2 M L. Bajo
10 Kabel NYM 2 x 2,5 mm3 M L. Bajo
11 Kabel NYM 4 x 4 mm2 M L. Bajo
12 Kabel NYMHY 4 x 2,5 mm2 M L. Bajo
KABEL GROUNDING TERPASANG -
1 Kabel BC 240 mm2 M L. Bajo
2 Kabel BC 185 mm2 M L. Bajo
3 Kabel BC 150 mm2 M L. Bajo
4 Kabel BC 120 mm2 M L. Bajo
5 Kabel BC 95 mm2 M L. Bajo
6 Kabel BC 70 mm2 M L. Bajo
7 Kabel BC 50 mm2 M L. Bajo
8 Kabel BC 35 mm2 M L. Bajo
9 Kabel BC 25 mm2 M L. Bajo
10 Kabel BC 16 mm2 M L. Bajo
11 Kabel BC 10 mm2 M L. Bajo
12 Kabel BC 6 mm2 M L. Bajo
13 Kabel BC 4 mm2 M L. Bajo

PEKERJAAN PEMASANGAN LAMPU


LAMPU
Lampu RM 300 3X18W ACR SAVY,T LED
1 Bh L. Bajo
ESS 3 X 8W

2 Lampu RM 300 ACR 3X18W/54 + BATT Bh L. Bajo

Lampu RM 300 2X18W ACR SAVY ,T LED


3 Bh L. Bajo
ESS 2 X 8W

Lampu RM 300 2X18W ACR SAVY T LED


4 Bh L. Bajo
2 X 8W + BATT
5 BARET SCB 20 ACR 11,5 W Bh L. Bajo
BARET SCB 20 ACR LED KTK 24W +
6 Bh L. Bajo
BATT

Down Light RD 125 E 27 SAVY LED BULB


7 Bh L. Bajo
6,5-60W

Lampu RM 300 2X18W M2 SAVY ,T LED


8 Bh L. Bajo
ESS 2 X 8W

Down Light RD 150 E 27 SAVY LED BULB


9 Bh L. Bajo
10,5-85W

TK CG 1X36W SAVY T LED ESS 1 X


10 Bh L. Bajo
14,5W 1600lm

Lampu Taman GL TOP TRP T 27 PL ESS


11 Bh L. Bajo
35W

Lampu RM 300 2X36W M2 SAVY ,T LED


12 Bh L. Bajo
ESS 2 X 14,5W

WATHERPROOF ELEKTRA,PC 1X36,T-


13 Bh L. Bajo
LED ESST.1X16W+BATT.

RM 300 2X36 ACR SAVY, T LED ESS


14 Bh L. Bajo
2X14,5W

RM 300 2X36W ACR SAVY T LED 2 X


15 Bh L. Bajo
16W +BATT.
Lampu Strip Light indoor 10-77W ( 10 m) life
16 Bh L. Bajo
time 50.000 jam + trafo

Down Light Outbow chotac 150 E 27 LED


17 Bh L. Bajo
BULB 8-70W

18 EXIT LED AL 1MKHUGO (komplet set) Bh L. Bajo

19 Lampu sorot LED 80W (set) Bh L. Bajo


20 Lampu sorot pohon morisca 50w Bh L. Bajo
21 Lampu PJU led 80W + Tiang 7m+fondasi Bh L. Bajo
22 Stop Kontak Bh L. Bajo
23 Stop Kontak Lantai(3 MODUL) Bh L. Bajo
24 Sakelar Ganda Bh L. Bajo
25 Sakelar Tunggal Bh L. Bajo
26 Sakelar Hotel Bh L. Bajo
27 Sakelar Cam/Handle Bh L. Bajo

BAHAN INSTALASI
1 Kabel, NYM 3 x 2,5 mm2 ( Ex Supreme ) M L. Bajo
2 Pipa Conduit 20MM M L. Bajo
3 In Bow Doos Bh L. Bajo
4 Tee Doos Bh L. Bajo
5 Klem Pipa Bh L. Bajo
6 Fhiser Bh L. Bajo
7 Las Doop Bh L. Bajo
8 Isolasi Bh L. Bajo

PEKERJAAN PEMASANGAN PANEL


PANEL
1 Panel 80 x 200 x 70 cm Standing Floor Unit L. Bajo
2 Panel 80 x 180 x 70 cm Standing Floor Unit L. Bajo
3 Panel 80 x 120 x 30 cm wall mounted Unit L. Bajo
4 Panel 70 x 110 x 30 cm wall mounted Unit L. Bajo
5 Panel 60 x 80 x 30 cm wall mounted Unit L. Bajo
6 Panel 40 x 60 x 25 cm wall mounted Unit L. Bajo
7 Panel 30 x 40 x 20 cm wall mounted Unit L. Bajo
8 Panel PJU 40 x 60 x 25 cm outdoor Unit L. Bajo
9 Box Hager 4 group Unit L. Bajo
10 Box Hager 6 group Unit L. Bajo
11 Box Hager 8 group Ttk L. Bajo
ACCESSORIS

1 Lampu Indikator 3 warna (Telemekanic) + fuse Bh L. Bajo

2 Selector Switch Volt meter, 7 posisi Bh L. Bajo


3 Ampere meter, Skala 400 A (GAE) Bh L. Bajo
4 Volt Meter AC 220 / 380 V (GAE) Bh L. Bajo
5 Cos φ meter Bh L. Bajo
6 Frequensi Meter 48-52 LED (GAE) Bh L. Bajo
7 kWH Meter 3 fasa Bh L. Bajo
8 CT 1000/5 Bh L. Bajo
9 CT 500/5 Bh L. Bajo
10 CT 100/5 Bh L. Bajo
11 Timer Switch + kontaktor Bh L. Bajo

BAHAN INSTALASI -
1 Pipa Spitzen / tembaga dia 1 1/2 " Ljr L. Bajo
2 Kawat BC 70 M L. Bajo
3 Kawat BC 35 M L. Bajo
4 klem tembaga Bh L. Bajo
5 shock besi dia 1 1/2' Bh L. Bajo
6 Bak kontrol 40 x 40 lengkap Unit L. Bajo

ACB, MCCB DAN MCB -


MCCB -

1 MCCB NS Micrologic 5.1 320-800 A/3P/70ka Bh L. Bajo

MCCB 100, 125, 160, 200, 225, 250 A /3


2 Bh L. Bajo
P/36 kA

MCCB 15, 20, 25, 30, 40, 50, 60, 75, 80, 100
3 Bh L. Bajo
A /3 P/30 kA

MCCB 100, 125, 160, 200, 225, 250 A /3


4 Bh L. Bajo
P/25 kA

MCCB 100, 125, 160, 200, 225, 250 A /3


5 Bh L. Bajo
P/18 kA

MCCB 15, 20, 25, 30, 40, 50, 60, 75, 80, 100
6 Bh L. Bajo
A /3 P/18 kA

MCB 3 PHASE -
1 MCB 25, 32, 40A/3P/6 KA Bh L. Bajo
2 MCB 6, 10, 16, 20A/3P/6 KA Bh L. Bajo
3 MCB 25, 32, 40 A/3P/4,5 KA Bh L. Bajo
4 MCB 6, 10, 16, 20A/3P/4,5 KA Bh L. Bajo
0 0 -
0 MCB 1 PHASE -
1 MCB 50, 63A/1P/4.5 KA Bh L. Bajo
2 MCB 2, 4, 6,10,16 ,20, 25, 32, 40A/1P/4.5 KA Bh L. Bajo

PEKERJAAN PEMASANGAN AIR


-
CONDITIONER & EXHAUST FAN
AC -
1 AC 2 PK Split Wall Mounted Unit L. Bajo
2 AC 5 PK Ceiling Cassete Unit L. Bajo
3 AC 3 PK Ceiling Cassete Unit L. Bajo
4 AC 2,5 PK Ceiling Cassete Unit L. Bajo
5 AC 2,5 PK Split Wall Mounted Unit L. Bajo
6 AC 1.5 PK Split Wall Mounted Unit L. Bajo
7 AC 1 PK Split Wall Mounted Unit L. Bajo
8 AC 3/4 PK Split Wall Mounted Unit L. Bajo
9 AC 2 PK Ceiling Cassete Unit L. Bajo
10 Ceiling Concealed (High Static) Unit L. Bajo
11 95900 BTU/H -
12 Outdoor Multi-V IV Unit L. Bajo
13 95900 BTU/H -

EXHAUST FAN -
1 Exhaust fan 110 Cfm Ceiling Mounted Unit L. Bajo
2 Exhaust fan 1000 Cfm Wall Mounted Unit L. Bajo
3 Exhaust fan 2000 Cfm Wall Mounted Unit L. Bajo

BAHAN INSTALASI -
1 Pipa Refrigerant 1-2 pk + isolasi M L. Bajo
2 Pipa Refrigerant 3-4 pk + isolasi M L. Bajo
3 Pangkon out door Psng L. Bajo
4 Pipa drain PVC 3/4" m L. Bajo
5 Kabel Power NYM 3 x 2.5 mm2 (1-2 PK) M L. Bajo
6 Kabel kontrol NYM 2 x 2.5 mm2 (1-2 PK) M L. Bajo
7 Kabel kontrol NYM 4 x 2.5 mm2 (3-5 PK) M L. Bajo
8 Kabel Power NYM 4 x 4 mm2 (3-5 PK) M L. Bajo
9 Kabel NYA 2.5 mm M L. Bajo
10 Exhaust Air Grille 45X45 cm Bh L. Bajo
11 Ducting dengan pipa PVC Ø 4' M L. Bajo
12 Klem Pipa Bh L. Bajo
13 T dos Bh L. Bajo

PEKERJAAN SOUND SISTEM -


SOUND SYSTEM -
1 Power Amplifier 1000 (4X250) Watt Unit L. Bajo
2 Power Amplifier 240 Watt Unit L. Bajo
3 Power Amplifier 120 Watt Unit L. Bajo
4 Power Amplifier 60 Watt Unit L. Bajo
5 Digital Mixer Pre- Amp(build in equalizer) Unit L. Bajo
6 Equalizer 30 Channel Unit L. Bajo
7 Emergency Massage w/Evac Voice Unit L. Bajo
8 CD/MMC/USB Player with tunner Unit L. Bajo
9 Dynamic Microphone Bh L. Bajo
10 Outlet Microphone Bh L. Bajo
11 Outlet Sound System Bh L. Bajo
12 Selector Switch 10 Zone Bh L. Bajo
13 Sound Terminal Box 10 pairs uk. 20x15x25 cm + mtrl
Bh L. Bajo
14 Volume Control 6 watt Bh L. Bajo
15 Ceiling speaker 6 watt Bh L. Bajo
16 Coloum Speaker 20 watt Bh L. Bajo
17 Horn Speaker 25 w Bh L. Bajo
18 Cabinet Rack with Acc Bh L. Bajo
19 Remote micropone w/keypad zone selector Bh L. Bajo

BAHAN INSTALASI -
1 Kabel, NYMHY 2 X 2,5 mm2 M L. Bajo
2 Pipa Conduit M L. Bajo
3 Socket Pipa Bh L. Bajo
4 Tee Doos Bh L. Bajo
5 Klem Pipa Bh L. Bajo
6 Fhiser Bh L. Bajo

PEKERJAAN FIRE ALARM & APAR -


1 Mater Control Panel 5 Zone Unit L. Bajo
2 Annunciator Panel 5 Zone Unit L. Bajo
3 Terminal Box Fire Alarm 12 Pair Bh L. Bajo
4 Terminal Box Fire Alarm 24 Pair Bh L. Bajo
5 Rate Of Rise Heat Detector HC-306 Bh L. Bajo
6 Fixed Temperature Heat Detector HC-407 Bh L. Bajo
7 Smoke Detector (Independent) HC-208 Bh L. Bajo
8 Manual Push Button (Break glass) Bh L. Bajo
9 Alarm Bell 6" 24 VDC Bh L. Bajo
10 Indicating Lamp HC-300L Bh L. Bajo
Fire Extinguser's 25 Kg Trolly u/ R. Pompa,
11 Bh L. Bajo
Genset
12 Fire Extinguser's 50 Kg u/ R. Panel Bh L. Bajo
13 Fire Extinguisher 6 kg Bh L. Bajo
14 Fire Extinguisher 3 kg Bh L. Bajo

BAHAN INSTALASI -
1 Kabel, NYMHY 2 X 1,5 mm2 M L. Bajo
2 Pipa Conduit M L. Bajo
3 Socket Pipa Bh L. Bajo
4 Tee Doos Bh L. Bajo
5 Klem Pipa Bh L. Bajo
6 Fhiser Bh L. Bajo
PEKERJAAN PEMASANGAN
-
TELEPHONE
1 PABX 3 Line 8 ext Unit L. Bajo
2 PABX 6 Line 16 ext Unit L. Bajo
3 PABX 8 Line 24 ext KX TDA 100 Unit L. Bajo
4 PABX 16 Line 40 ext KX TDA 200 Unit L. Bajo
5 PABX 8 line 64 ext Unit L. Bajo
6 Terminal Box Telephone Bh L. Bajo
7 Outlet telephon Bh L. Bajo
8 Key telephon display Bh L. Bajo
9 Pesawat Telepon Standart Bh L. Bajo
MDF+Arester pelindung petir + kabel power +
10 Unit L. Bajo
grounding
11 Batteryfor back up stanby (-/+30 menite) Bh L. Bajo
12 Kabel ITC 1 (2x0,6) mm2 (1 pair) M L. Bajo
13 Kabel ITC 10 (2x0,6) mm2 (10 pair) M L. Bajo
14 Kabel ITC 20 (2x0,6) mm2 (20 pair) M L. Bajo
15 Kabel ITC 40 (2x0,6) mm2 (40 pair) M L. Bajo
16 Kabel ITC 50 (2x0,6) mm2 (50 pair) M L. Bajo

BAHAN INSTALASI -
1 Kabel ITC 2x0,6mm2 M L. Bajo
2 Pipa Conduit M L. Bajo
3 Socket Pipa M L. Bajo
4 Tee Doos Bh L. Bajo
5 Klem Pipa Bh L. Bajo
6 Fhiser Bh L. Bajo

PEKERJAAN KABEL TRAY -


1 Kabel Tray Tipe U (200x100 mm) M L. Bajo
2 Kabel Tray Tipe U (300x100 mm) M L. Bajo
3 Kabel Ladder Tipe U (200x100 mm) M L. Bajo
4 Kabel Ladder Tipe U (400x100 mm) M L. Bajo
5 Besi siku 4.4.4 M L. Bajo
6 Mur Baut + Fisher Pcs L. Bajo

BAHAN INSTALASI -
1 Kabel NYM 3 X 2,5 mm M L. Bajo
2 Pipa conduit ljr L. Bajo
3 Socket Pipa bh L. Bajo
4 Tee Doos bh L. Bajo
5 Klem Pipa bh L. Bajo
6 Inbow dos bh L. Bajo
PEKERJAAN PEMASANGAN MA TV -
1 Antena UHV/VHF Unit L. Bajo
2 Boster 48 db Unit L. Bajo
3 Spliter 8 way Unit L. Bajo
4 Outlet TV Unit L. Bajo
5 Spliter 4 way Unit L. Bajo
Televisi LED 32 inc + support galvanis
6 Bh L. Bajo
gantungan

BAHAN INSTALASI -
1 Kabel, Coaxial 5C-2V M L. Bajo
2 Pipa Conduit M L. Bajo
3 Socket Pipa Bh L. Bajo
4 Tee Doos Bh L. Bajo
5 Klem Pipa Bh L. Bajo
6 Fhiser Bh L. Bajo

PEKERJAAN PEMASANGAN CCTV -


1 Indoor Fixed Dome Camera Unit L. Bajo
2 IP Indoor Dome Camera Unit L. Bajo
3 Indoor Pan / Tilt / Zoom Camera Unit L. Bajo
4 NVR 16 Channel W/ HDD 4TB Unit L. Bajo
5 32" LED TV Unit L. Bajo
6 24 VAC Power Supply Unit L. Bajo
7 Positioning Device Colroller Unit L. Bajo

BAHAN INSTALASI -
1 Kabel RG - 59 M L. Bajo
2 Kabel STP 18 AWG M L. Bajo
3 Kabel NYMHY 3 x 2,5 mm2 M L. Bajo
4 Pipa Conduit M L. Bajo
5 Socket Pipa Bh L. Bajo
6 Tee Doos Bh L. Bajo
7 Klem Pipa Bh L. Bajo
8 Fhiser Bh L. Bajo

PEKERJAAN PEMASANGAN LAN -


1 Switch Hub 24 port Unit L. Bajo
2 Switch Hub 16 port Unit L. Bajo
3 Switch Hub 8 port Unit L. Bajo
4 Outlet RJ45 inbow Bh L. Bajo

BAHAN INSTALASI -
1 Kabel UTP CAT 6 E M L. Bajo
2 Kabel labeling M L. Bajo
3 Pipa Conduit M L. Bajo
4 Socket Pipa M L. Bajo
5 Tee Doos Bh L. Bajo
6 Klem Pipa Bh L. Bajo
7 Fhiser Bh L. Bajo

PEKERJAAN PEMASANGAN NURSE


-
CALL
1 20 Call Master Master Bh L. Bajo
2 Power Supply Bh L. Bajo
3 Call Button u/ Bed Bh L. Bajo
4 Receptacle For Call Button Bh L. Bajo

5 Call Speaker Sub Station Ceiling Mounted Bh L. Bajo

6 Reset Button Bh L. Bajo


7 Corridor Lamp Bh L. Bajo
8 Bathroom pullcord u/kamar mandi Bh L. Bajo
Installasi kabel ITC 2 X 2 X 0,6 mm dalam
9 ttk
conduite

PEKERJAAN PEMASANGAN
-
PENANGKAL PETIR

Head Penangkal Petir non


1 unit L. Bajo
radioaktif radius 150 m Ex. Kurn
2 Down Conductor NYY 1x70 mm m L. Bajo
Dudukan Tiang, Tiang Penangkal
3 unit L. Bajo
Petir (5 Meter) dan mtrl bantu

Grounding Sistem, Bak kontrol, dan


4 ls L. Bajo
Instalasi
5 Klem & material bantu ls L. Bajo
6 Perijinanan ls L. Bajo

M Bahan Bakar dan Minyak Pelumas


1 Bahan Bakar Premium ( Non Subsidi ) Ltr L. Bajo
2 Bahan Bakar Solar ( Non Subsidi ) Ltr L. Bajo
3 Minyak Pelumas Ltr 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
4 Minyak Bekisting Liter 3,500.00 0.80 1.00 20.00 30.00 308,324.11 3.00 2.00 60.00 60.00 125.00 1,344.00 229.41 4.00 0.001 4.00 0.001 229.41 L. Bajo
DAFTAR HARGA SATUAN BAHAN

DIAMBIL HARGA TERENDAH


HARGA TOTAL

KE LOKASI PEKERJAAN (Rp)


NON LOKAL HASIL SURVEY
DAN HARGA STANDAR (HS)

ONGKOS ANGKUT BAHAN


KONSULTAN PERENCANA

KONSULTAN DAN HARGA

HARGA BAHAN LOKAL &

HARGA SATUAN (Rp. )


STANDARISASI 2022 )

TERMASUK ONGKOS
RETRI- BAHAN HRG. BAHAN

BUPATI 2021 BELUM

MATERIAL/BAHAN
(HARGA SURVEY

LOKASI/ QUARY
HRAGA SURVEY
PROYEK

ANGKUT (Rp)
TAHUN 2022

SATUAN
BUSI PROYEK (HBP)
NO JENIS MATERIAL/BAHAN
GAL.C 25 % (HBP) TERMASUK
25% PAJAK
(Rp) (Rp) (Rp)
25%

A BAHAN LOKAL
1 Balok Kayu Kelas I (Lokal) Jati 9,100,000.00 9,100,000.00 M³ 9,100,000.00 123,880.22 9,223,880.22 9,223,880.22 9,223,800.00 L. Bajo
2 Papan Kayu Kelas I (Lokal) Jati 7,875,000.00 7,875,000.00 M³ 7,875,000.00 123,880.22 7,998,880.22 7,998,880.22 7,998,800.00 L. Bajo
3 Papan Kayu Klas II Lokal 3,060,000.00 3,060,000.00 M³ 3,060,000.00 123,880.22 3,183,880.22 3,183,880.22 3,183,800.00 L. Bajo
4 Balok Kayu Klas II 5/7 CM (Lokal) 3,840,000.00 3,840,000.00 M³ 3,840,000.00 123,880.22 3,963,880.22 3,963,880.22 3,963,800.00 L. Bajo
5 Balok Kayu Klas II 8/12 CM (Lokal) 2,800,000.00 2,800,000.00 M³ 2,800,000.00 123,880.22 2,923,880.22 2,923,880.22 2,923,800.00 L. Bajo
6 Kayu Klas III (Lokal) 2,240,000.00 2,240,000.00 M³ 2,240,000.00 123,880.22 2,363,880.22 2,363,880.22 2,363,880.22 L. Bajo
7 Bambu Diameter 6 - 8 / 600 cm 35,000.00 35,000.00 Btg 35,000.00 1,238.80 36,238.80 36,238.80 36,200.00 L. Bajo

8 Kayu Dolken/Perancah (Ø 8-10 ) cm, P= 4 m 15,000.00 15,000.00 btg 15,000.00 1,238.80 16,238.80 16,238.80 16,200.00 L. Bajo

9 Ready Mix K-300 - - M³ - 136,497.65 136,497.65 136,497.65 L. Bajo


10 Ready Mix K-250 - - M³ - 136,497.65 136,497.65 136,497.65 L. Bajo
11 Ready Mix K-200 - - M³ - 136,497.65 136,497.65 136,497.65 L. Bajo
12 Batu Pecah 2 - 3 cm 250,000.00 250,000.00 M³ 250,000.00 62,500.00 120,439.11 432,939.11 432,939.11 432,900.00 L. Bajo
13 Batu Belah/Batu Kali 133,333.00 133,333.00 M³ 133,333.00 33,333.25 120,439.11 287,105.36 287,105.36 287,100.00 L. Bajo
14 Pasir beton 150,000.00 150,000.00 M³ 150,000.00 37,500.00 361,317.32 548,817.32 548,817.32 548,800.00 Wae Longge
15 Pasir Pasang 150,000.00 150,000.00 M³ 150,000.00 37,500.00 361,317.32 548,817.32 548,817.32 548,800.00 Wae Longge
16 Pasir Urug 200,000.00 200,000.00 M³ 200,000.00 50,000.00 361,317.32 611,317.32 611,317.32 611,300.00 Nanga Nae
17 Timbunan Sirtu Kali 100,000.00 100,000.00 M³ 100,000.00 25,000.00 120,439.11 245,439.11 245,439.11 245,400.00 L. Bajo
18 Tanah Urug (Cadas) 50,000.00 50,000.00 M³ 50,000.00 12,500.00 120,439.11 182,939.11 182,939.11 182,900.00 L. Bajo
19 Ijuk 30,000.00 30,000.00 Kg 30,000.00 68.82 30,068.82 30,068.82 30,000.00 L. Bajo
20 Tali Ijuk 10,000.00 10,000.00 Kg 10,000.00 68.82 10,068.82 10,068.82 10,000.00 L. Bajo
21 Air Kerja 60.00 60.00 Liter 60.00 51.39 111.39 111.39 100.00 L. Bajo
22 Bata Merah 1,100.00 1,100.00 Bh 1,100.00 275.00 513.87 1,888.87 1,888.87 1,800.00 L. Bajo
23 Bataco Uk. 12 x 15 x 25 cm 3,000.00 3,000.00 Bh 3,000.00 750.00 802.93 4,552.93 4,552.93 4,500.00 L. Bajo
24 Stone Block/Paving Block tebal 8 cm 120,000.00 120,000.00 M² 120,000.00 30,000.00 802.93 150,802.93 150,802.93 150,800.00 L. Bajo
25 Roster uk. 20 x 20 x 8 cm 20,000.00 20,000.00 Btg 20,000.00 802.93 20,802.93 20,802.93 20,800.00 L. Bajo
DAN HARGA STANDARISASI 2022 )

2021 BELUM TERMASUK ONGKOS


HARGA TOTAL

HARGA STANDAR (HS) BUPATI


HARGA BAHAN LOKAL & NON
(HARGA SURVEY KONSULTAN

ONGKOS ANGKUT BAHAN KE


HRAGA SURVEY KONSULTAN

DIAMBIL HARGA TERENDAH

LOKAL HASIL SURVEY DAN


PERENCANA TAHUN 2022

LOKASI PEKERJAAN (Rp)


RETRI- BAHAN HRG. BAHAN

HARGA SATUAN (Rp. )

MATERIAL/BAHAN
LOKASI/ QUARY
PROYEK

ANGKUT (Rp)
SATUAN
BUSI PROYEK (HBP)
NO JENIS MATERIAL/BAHAN
GAL.C 25 % (HBP) TERMASUK

25% PAJAK

(Rp) (Rp) (Rp)

25%
B BAHAN NON LOKAL
Aluminium Composit Panel ( ACP ) Cutting
1 850,000.00 850,000.00 Lbr 850,000.00 1,391.75 851,391.75 851,391.75 851,300.00 L. Bajo
Laser Sparkling tebal 4 mm setara
Alumanium Foil/Sisalation Double Side bahan
2 15,000.00 15,000.00 M' 15,000.00 32.12 15,032.12 15,032.12 15,000.00 L. Bajo
dasar plastik
3 Metal Cutting Laser tebal 3 mm setara 1,300,000.00 1,300,000.00 M² 1,300,000.00 1,391.75 1,301,391.75 1,301,391.75 1,301,300.00 L. Bajo
4 Pintu, Jendela dan Boven Aluminium 1,800,000.00 1,800,000.00 M' 1,800,000.00 1,391.75 1,801,391.75 1,801,391.75 1,801,300.00 L. Bajo
5 Huruf timbul Acrylic t=5mm 20,000.00 20,000.00 Cm 20,000.00 32.12 20,032.12 20,032.12 20,000.00 L. Bajo
Kosen Aluminium Alexindo 4 inch Coating
6 450,000.00 450,000.00 M' 450,000.00 1,391.75 451,391.75 451,391.75 451,300.00 L. Bajo
5/10 ''
Roof Bottom/Bottom Cord Bracing /Reng 33 -
7 8,333.00 8,333.00 M' 8,333.00 1,391.75 9,724.75 9,724.75 9,700.00 L. Bajo
0.45 Klas A
8 Baja Ringan / Main truss C - 75 - 75 Klas A 20,833.00 20,833.00 M' 20,833.00 1,391.75 22,224.75 22,224.75 22,200.00 L. Bajo
9 Alluminium strip lebar 8 cm 47,500.00 47,500.00 M' 47,500.00 417.53 47,917.53 47,917.53 47,900.00 L. Bajo
10 List Plafon Shadowline/Tali air 8,333.00 8,333.00 M' 8,333.00 417.53 8,750.53 8,750.53 8,700.00 L. Bajo
11 C Stud Metal 18,333.00 18,333.00 M 18,333.00 1,391.75 19,724.75 19,724.75 19,700.00 L. Bajo
12 U Channel (Uranner) 15,000.00 15,000.00 M 15,000.00 1,391.75 16,391.75 16,391.75 16,300.00 L. Bajo
13 Conctrete Bracket/ Angle Clip - - Bh - 139.18 139.18 139.18 100.00 L. Bajo
14 List/Profil Kaca Elaxindo Warna 310,000.00 310,000.00 M' 310,000.00 139.18 310,139.18 310,139.18 310,100.00 L. Bajo

15 Frame Alumunium Alexindo 30/70 -100 MM 27,500.00 27,500.00 M' 27,500.00 417.53 27,917.53 27,917.53 27,900.00 L. Bajo

16 Rangka metal stud (MS 100) uk.100 x 34 mm - - M' - 417.53 417.53 417.53 400.00 L. Bajo

17 Rangka U runner (U 100) uk.100 x 30 mm - - M' - 417.53 417.53 417.53 400.00 L. Bajo
18 Kawat Beton/ikat 25,000.00 25,000.00 Kg 25,000.00 208.76 25,208.76 25,208.76 25,200.00 L. Bajo
19 Kawat Las RB 26 47,500.00 47,500.00 Kg 47,500.00 208.76 47,708.76 47,708.76 47,700.00 L. Bajo

20 (Wiremesh) M6 x 2.1M x 5.4M (SNI-SERTIF) 14,384.00 14,384.00 Lbr 14,384.00 119.29 14,503.29 14,503.29 14,500.00 L. Bajo
21 (Wiremesh) M8 x 2.1M x 5.4M (SNI-SERTIF) 15,375.00 15,375.00 Lbr 15,375.00 119.29 15,494.29 15,494.29 15,400.00 L. Bajo

22 (Wiremesh) M10 x 2.1M x 5.4M (SNI-SERTIF) - - Lbr - 119.29 119.29 119.29 100.00 L. Bajo

Jaring kawat baja dilas Standart SNI Uk.2,1 m x


23 - - Kg - 11,597.95 11,597.95 11,597.95 11,500.00 L. Bajo
5,4 m M Ø 10 mm
24 Kawat Jaring Galvanis - - M² - 11,597.95 11,597.95 11,597.95 11,500.00 L. Bajo
Pengadaan dan Pemasangan Rilling Tangga besi
25 700,000.00 700,000.00 M² 700,000.00 11,597.95 711,597.95 711,597.95 711,500.00 L. Bajo
hollow + Plat besi 2 mm
26 Hollow Besi 40x40 210,000.00 210,000.00 Btg 210,000.00 167.01 210,167.01 210,167.01 210,100.00 L. Bajo
27 Hollow Besi 20/40 140,000.00 140,000.00 Btg 140,000.00 167.01 140,167.01 140,167.01 140,100.00 L. Bajo
28 Hollow Besi 50x50x2 mm 385,000.00 385,000.00 Btg 385,000.00 167.01 385,167.01 385,167.01 385,100.00 L. Bajo
29 Hollow Besi 40x60x2 mm 19,220.00 19,220.00 Kg 19,220.00 167.01 19,387.01 19,387.01 19,300.00 L. Bajo
30 Pipa Galvanis 1/2 Dim 250,000.00 250,000.00 Btg 250,000.00 167.01 250,167.01 250,167.01 250,100.00 L. Bajo
31 Hollow 50x10 650,000.00 650,000.00 Btg 650,000.00 2,783.51 652,783.51 652,783.51 652,700.00 L. Bajo
32 Hollow 35.35. 2 mm Zincoromate 7,667.00 7,667.00 M' 7,667.00 167.01 7,834.01 7,834.01 7,800.00 L. Bajo
33 Hollow 15 . 35 . 2 mm Zincoromate 5,000.00 5,000.00 M' 5,000.00 167.01 5,167.01 5,167.01 5,100.00 L. Bajo
34 Hollow 35.35. 2 mm Galvanum - - M' - 167.01 167.01 167.01 100.00 L. Bajo
35 Hollow 15 . 35 . 2 mm Galvanum - - M' - 167.01 167.01 167.01 100.00 L. Bajo
36 Hollow Galvalum 40x40 280,000.00 280,000.00 Btg 280,000.00 167.01 280,167.01 280,167.01 280,100.00 L. Bajo
37 Hollow Galvalum 20/40 175,000.00 175,000.00 Btg 175,000.00 167.01 175,167.01 175,167.01 175,100.00 L. Bajo
38 Besi Ulir Ø 19 mm; P= 12 M 13,480.00 13,480.00 Kg 13,480.00 156.00 13,636.00 13,636.00 13,600.00 L. Bajo
39 Besi Ulir Ø 16 mm; P= 12 M 13,992.00 13,992.00 Kg 13,992.00 156.00 14,148.00 14,148.00 14,100.00 L. Bajo
40 Besi Ulir Ø 13 mm; P= 12 M 14,797.00 14,797.00 Kg 14,797.00 156.00 14,953.00 14,953.00 14,900.00 L. Bajo
41 Besi Polos Ø 12 mm; P 12 M 13,142.00 13,142.00 Kg 13,142.00 156.00 13,298.00 13,298.00 13,200.00 L. Bajo
42 Besi Polos Ø 10 mm; P = 12 M 13,517.00 13,517.00 Kg 13,517.00 156.00 13,673.00 13,673.00 13,600.00 L. Bajo
43 Besi polos Ø 8 mm; P=12 M 16,896.00 16,896.00 Kg 16,896.00 156.00 17,052.00 17,052.00 17,000.00 L. Bajo

44 Pipa Hawa ( P=1.00 M ) GIP 1.5" + Complit 250,000.00 250,000.00 Kg 250,000.00 1,559.99 251,559.99 251,559.99 251,500.00 L. Bajo

B Pengisi Lantai dan Dinding - - - - - - - - -


Bata Ringan AAC (Autoclaved Aerated
1 1,200,000.00 1,200,000.00 M³ 1,200,000.00 229,410.11 1,429,410.11 1,429,410.11 1,429,400.00 L. Bajo
Concrete) uk. 60 x 20 x 10 cm
Paving Block Hexagon Diameter 20 cm Tebal 8
2 - - M² - 802.94 802.94 802.94 800.00 L. Bajo
cm
3 Roster Beton 20x20 - - Bh - 802.94 802.94 802.94 800.00 L. Bajo
4 Granitile 60x60 Polish 65,000.00 65,000.00 Bh 65,000.00 6,691.13 71,691.13 71,691.13 71,600.00 L. Bajo
5 Granitile 60x60 Unpolish 83,333.00 83,333.00 Bh 83,333.00 6,691.13 90,024.13 90,024.13 90,000.00 L. Bajo
6 Keramik 50x50 Unpolish - - Dos - 5,352.90 5,352.90 5,352.90 5,300.00 L. Bajo
7 Keramik 60x60 Polish 150,000.00 150,000.00 Dos 150,000.00 6,691.13 156,691.13 156,691.13 156,600.00 L. Bajo
8 Keramik 60x60 Unpolish - - Dos - 6,691.13 6,691.13 6,691.13 6,600.00 L. Bajo
9 Keramik 30x30 60,000.00 60,000.00 Dos 60,000.00 3,345.56 63,345.56 63,345.56 63,300.00 L. Bajo
10 Keramik Ukuran 40 x 40 cm warna/motif 75,000.00 75,000.00 Dos 75,000.00 4,014.68 79,014.68 79,014.68 79,000.00 L. Bajo
11 Keramik ukuran 60 x 60 cm Warna/motif 150,000.00 150,000.00 Dos 150,000.00 6,691.13 156,691.13 156,691.13 156,600.00 L. Bajo
12 Keramik Anti Slip Ukuran 40 x 40 cm 95,000.00 95,000.00 Dos 95,000.00 4,014.68 99,014.68 99,014.68 99,000.00 L. Bajo
13 Keramik Anti Slip ukuran 60 x 60 cm - - Dos - 6,691.13 6,691.13 6,691.13 6,600.00 L. Bajo
14 Keramik Ukuran 30 x 30 cm warna/motif - - Bh - 3,345.56 3,345.56 3,345.56 3,300.00 L. Bajo
15 Plint Keramik 10x30 - - Btg - 72.99 72.99 72.99 - L. Bajo
16 Plint Keramik 10x40 15,000.00 15,000.00 Btg 15,000.00 80.29 15,080.29 15,080.29 15,000.00 L. Bajo
17 Plint Keramik 10x50 - - Btg - 89.22 89.22 89.22 - L. Bajo
18 Plint Keramik 10x60 25,000.00 25,000.00 Btg 25,000.00 100.37 25,100.37 25,100.37 25,100.00 L. Bajo
19 Granit 60 x 60 CM - - Dos - 4,014.68 4,014.68 4,014.68 4,000.00 L. Bajo
20 Granit Anti Slip Ukuran 60 x 60 CM - - Dos - 4,014.68 4,014.68 4,014.68 4,000.00 L. Bajo

21 Plint Granit Ukuran 10 x 60 cm Timbul Motif 35,000.00 35,000.00 Btg 35,000.00 100.37 35,100.37 35,100.37 35,100.00 L. Bajo

22 Vynil lantai , anti bacterial - - - - 229,410.11 229,410.11 229,410.11 229,400.00 L. Bajo


23 Rumput Jepang 45,000.00 45,000.00 M² 45,000.00 229.41 45,229.41 45,229.41 45,200.00 L. Bajo
24 Partisi Toilet Cubicle Phenolic+Aksesoris 2,500,000.00 2,500,000.00 M² 2,500,000.00 2,007.34 2,502,007.34 2,502,007.34 2,502,000.00 L. Bajo

25 Karpet Karet Ramp Motif Koin Tebal 4 mm 316,667.00 316,667.00 M 316,667.00 229.41 316,896.41 316,896.41 316,800.00 L. Bajo

C Besi Baja
0 Besi Baja H Beam Panjang 12 meter
1 L 100x100x6x8 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
2 L 125x125x5x7 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
3 L 125x125x6.5×9 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
4 L 150x150x7x10 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
5 L 175x175x7x11 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
6 L 200x200x8x12 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
7 L 250x250x9x14 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
8 L 300x300x10x15 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
9 L 250x350x12x19 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,229.41 L. Bajo
10 L 400x400x13x21 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
0 Besi Baja WF ( Wide Flange ) Panjang 12 meter
1 WF 100X50X5 X7 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
2 WF 125X60X6 X8 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
3 WF 148X100X6X9 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
4 WF 150X75X5X7 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
5 WF 175X90X5X8 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
6 WF 198X99X4,5X7 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
7 WF 200X100X3,2X4,5 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
8 WF 200X100X5,5X8 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
9 WF 248X124X5X8 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
10 WF 250X125X6X9 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
11 WF 298X149X6X8 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
12 WF 300X150X6,5X9 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
13 WF 346X174X6X9 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
14 WF 350X175X7X11 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
15 WF 396X199X7X11 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
16 WF 400X200X8 X13 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
17 WF 446X199X8X12 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
18 WF 450X200X9X14 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
19 WF 500X200X10X16 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
20 WF 588X300X10X16 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
21 WF 600X200X11X17 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
22 WF 700X300X13X24 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
23 WF 800X300X14X26 27,000.00 27,000.00 Kg 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
0 Besi Baja kanal C/ CNP Panjang 6 meter - - - - - - - - -
1 L 60X30X10X1,6 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
2 L 75X35X15X1,6 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
3 L 75 X45X15X1,6 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
4 L 75X45X15X2,3 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
5 L 100X50X20X1,6 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
6 L 100X50X20X2,3 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
7 L 100X50X20X3,2 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
8 L 125X50X20X2,3 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
9 L 125X50X20X3,2 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
10 L 150X50X20X2,3 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
11 L 150X50X20X3,2 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
12 L 150X65X20X2,3 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
13 L 150X65X20X3,2 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
14 L 200X75X20X3,2 27,000.00 27,000.00 Kg 27,000.00 321.17 27,321.17 27,321.17 27,300.00 L. Bajo
D Penutup Atap
Atap Bitumen gelombang Monolayer 3 mm
1 190,000.00 190,000.00 Lbr 190,000.00 1,784.30 191,784.30 191,784.30 191,700.00 L. Bajo
Onduline
2 Nok / Ridge Onduline 75,000.00 75,000.00 Lbr 75,000.00 573.53 75,573.53 75,573.53 75,500.00 L. Bajo
3 Atap Spandek 0.3 390,000.00 390,000.00 Lbr 390,000.00 1,784.30 391,784.30 391,784.30 391,700.00 L. Bajo
4 Atap Policarbonat 5 mm Twinlite 2,500,000.00 2,500,000.00 Lbr 2,500,000.00 1,784.30 2,501,784.30 2,501,784.30 2,501,700.00 L. Bajo
5 Profil Sambungan Policarbonat 5 mm 200,000.00 200,000.00 Lbr 200,000.00 229.41 200,229.41 200,229.41 200,200.00 L. Bajo
6 Nok Bubungan Spandek L=30 75,000.00 75,000.00 M' 75,000.00 573.53 75,573.53 75,573.53 75,500.00 L. Bajo
7 Talang Jurai 0.4/3m 60,000.00 60,000.00 M' 60,000.00 573.53 60,573.53 60,573.53 60,500.00 L. Bajo
8 Atap Multiroof Berpasir 45,000.00 45,000.00 Lbr 45,000.00 229.41 45,229.41 45,229.41 45,200.00 L. Bajo
9 Jurai atap dan Nok Multiroof Berpasir 32,000.00 32,000.00 Pcs 32,000.00 229.41 32,229.41 32,229.41 32,200.00 L. Bajo
10 Wall Flashing ( rainbow roof ) 50,000.00 50,000.00 M' 50,000.00 349.10 50,349.10 50,349.10 50,300.00 L. Bajo
E Penutup Plafon - - - - - - - - -
1 List PVC 70,000.00 70,000.00 Btg 70,000.00 802.94 70,802.94 70,802.94 70,800.00 L. Bajo
2 Plafon PVC 8 mm 70,000.00 70,000.00 M' 70,000.00 1,605.87 71,605.87 71,605.87 71,600.00 L. Bajo
3 List Gypsum 25,000.00 25,000.00 M' 25,000.00 802.94 25,802.94 25,802.94 25,800.00 L. Bajo
4 Papan Kalsiplang Board tebal 9 MM 21,667.00 21,667.00 M' 21,667.00 1,605.87 23,272.87 23,272.87 23,200.00 L. Bajo
5 Papan GRC tebal 6 mm 40,800.00 40,800.00 M² 40,800.00 1,605.87 42,405.87 42,405.87 42,400.00 L. Bajo
6 Papan GRC tebal 10 mm 88,400.00 88,400.00 M² 88,400.00 1,605.87 90,005.87 90,005.87 90,000.00 L. Bajo
7 Gypsum Ex. Elephant tebal 9 MM 95,000.00 95,000.00 Lbr 95,000.00 1,605.87 96,605.87 96,605.87 96,600.00 L. Bajo
8 Kalsi Board tbl 6 mm 110,000.00 110,000.00 Lbr 110,000.00 1,605.87 111,605.87 111,605.87 111,600.00 L. Bajo
F Skrup & Paku - - - - - - - - -
1 Paku rivet 414.00 414.00 Bh 414.00 0.23 414.23 414.23 400.00 L. Bajo
2 Top Plat/Mur Plate - - Bh - 0.23 0.23 0.23 - L. Bajo
3 Speedy Screw 1,300.00 1,300.00 bh 1,300.00 0.23 1,300.23 1,300.23 1,300.00 L. Bajo
4 Dinabolt/Ramset dia 12 x 120 mm Klas A 12,500.00 12,500.00 Bh 12,500.00 0.23 12,500.23 12,500.23 12,500.00 L. Bajo
Self drilling screw dia 6 x 20 mm ( truss screw )
5 1,750.00 1,750.00 Bh 1,750.00 0.23 1,750.23 1,750.23 1,700.00 L. Bajo
Klas A
Self drilling screw dia 4 x 16 mm ( Roof bottom
6 280.00 280.00 Bh 280.00 0.23 280.23 280.23 200.00 L. Bajo
) Klas A
7 Sekrup F i s e r 3" 1,500.00 1,500.00 Bh 1,500.00 0.23 1,500.23 1,500.23 1,500.00 L. Bajo
8 Skrup Fixer 1,500.00 1,500.00 Bh 1,500.00 0.23 1,500.23 1,500.23 1,500.00 L. Bajo
9 Screw 60.00 60.00 Pcs 60.00 0.23 60.23 60.23 60.23 L. Bajo
10 Ramset/Dinabolt - - Bh - 0.23 0.23 0.23 - L. Bajo
11 Skrup Metal 60,000.00 60,000.00 Bh 60,000.00 0.23 60,000.23 60,000.23 60,000.00 L. Bajo
12 Paku skrup Gypsum 150,000.00 150,000.00 Dos 150,000.00 72.99 150,072.99 150,072.99 150,000.00 L. Bajo
13 Paku skrup 16,000.00 16,000.00 Bh 16,000.00 0.23 16,000.23 16,000.23 16,000.00 L. Bajo
14 Paku Seng 52,000.00 52,000.00 Kg 52,000.00 72.99 52,072.99 52,072.99 52,000.00 L. Bajo
15 Paku Ukuran 1,5 cm 25,000.00 25,000.00 Kg 25,000.00 72.99 25,072.99 25,072.99 25,000.00 L. Bajo
16 Paku Ukuran 2 cm 25,000.00 25,000.00 Kg 25,000.00 72.99 25,072.99 25,072.99 25,000.00 L. Bajo
17 Paku Ukuran 2,5 cm 20,000.00 20,000.00 Kg 20,000.00 72.99 20,072.99 20,072.99 20,000.00 L. Bajo
18 Paku Ukuran 3 cm 30,000.00 30,000.00 Kg 30,000.00 72.99 30,072.99 30,072.99 30,000.00 L. Bajo
19 Paku Ukuran 5-12 cm 22,000.00 22,000.00 Kg 22,000.00 72.99 22,072.99 22,072.99 22,000.00 L. Bajo
G Cat - - - - - - - - -
1 Sabun Besi - - Bh - 0.27 0.27 0.27 - L. Bajo
2 Soda Api 35,000.00 35,000.00 Ltr 35,000.00 229.41 35,229.41 35,229.41 35,200.00 L. Bajo
3 Cat Besi Delta 95,000.00 95,000.00 Kg 95,000.00 229.41 95,229.41 95,229.41 95,200.00 L. Bajo
4 Cat Kayu Mengkilat setara Emco Polibest 85,000.00 85,000.00 Kg 85,000.00 229.41 85,229.41 85,229.41 85,200.00 L. Bajo
5 Cat Tembok Jotun Interior setara 50,000.00 50,000.00 Kg 50,000.00 229.41 50,229.41 50,229.41 50,200.00 L. Bajo
6 Cat Tembok Jotun Exterior setara 105,000.00 105,000.00 Kg 105,000.00 229.41 105,229.41 105,229.41 105,200.00 L. Bajo
7 Cat Kayu ex. Emco 84,000.00 84,000.00 Kg 84,000.00 229.41 84,229.41 84,229.41 84,200.00 L. Bajo
8 Cat Tembok Paragon 24,800.00 24,800.00 Kg 24,800.00 229.41 25,029.41 25,029.41 25,000.00 L. Bajo
9 Cat Menie 65,000.00 65,000.00 Kg 65,000.00 229.41 65,229.41 65,229.41 65,200.00 L. Bajo
10 Dumpul/plamir Skim Coat 20 Kg/Big Lion 5,500.00 5,500.00 Kg 5,500.00 229.41 5,729.41 5,729.41 5,700.00 L. Bajo
11 Kwas 4 inch 40,000.00 40,000.00 Bh 40,000.00 114.71 40,114.71 40,114.71 40,100.00 L. Bajo
12 Lem Kayu Aibon 100,000.00 100,000.00 Kg 100,000.00 229.41 100,229.41 100,229.41 100,200.00 L. Bajo
13 Minyak Cat/ Thiner Spesial Avian 65,000.00 65,000.00 Kg 65,000.00 229.41 65,229.41 65,229.41 65,200.00 L. Bajo
14 Water Proof/ Aquaproof 53,000.00 53,000.00 Kg 53,000.00 229.41 53,229.41 53,229.41 53,200.00 L. Bajo
15 Wood Filler 55,000.00 55,000.00 Kg 55,000.00 229.41 55,229.41 55,229.41 55,200.00 L. Bajo
16 Kuas Roll 50,000.00 50,000.00 Bh 50,000.00 229.41 50,229.41 50,229.41 50,200.00 L. Bajo
H Pintu Jendela dan Aksesoris - - - - - - - - -
1 Gerendel Kuping Jendela 45,000.00 45,000.00 set 45,000.00 229.41 45,229.41 45,229.41 45,200.00 L. Bajo
2 Engsel Pintu 4" Paori 45,000.00 45,000.00 set 45,000.00 229.41 45,229.41 45,229.41 45,200.00 L. Bajo
3 Door Closer 400,000.00 400,000.00 Bh 400,000.00 229.41 400,229.41 400,229.41 400,200.00 L. Bajo
4 Lockcase 350,000.00 350,000.00 Bh 350,000.00 229.41 350,229.41 350,229.41 350,200.00 L. Bajo
5 Clinder Look 150,000.00 150,000.00 Bh 150,000.00 229.41 150,229.41 150,229.41 150,200.00 L. Bajo
6 Handle on Roses (HRE) 150,000.00 150,000.00 set 150,000.00 229.41 150,229.41 150,229.41 150,200.00 L. Bajo
7 Handle Sliding 200,000.00 200,000.00 set 200,000.00 229.41 200,229.41 200,229.41 200,200.00 L. Bajo
8 Pull Handle 60 Cm 783,000.00 783,000.00 set 783,000.00 229.41 783,229.41 783,229.41 783,200.00 L. Bajo
9 Grendel Biasa 24,000.00 24,000.00 bh 24,000.00 229.41 24,229.41 24,229.41 24,200.00 L. Bajo
10 Casement 70,000.00 70,000.00 set 70,000.00 229.41 70,229.41 70,229.41 70,200.00 L. Bajo
11 Floor hinges mutu tinggi 1,250,000.00 1,250,000.00 Psg 1,250,000.00 229.41 1,250,229.41 1,250,229.41 1,250,200.00 L. Bajo
12 patch Fitting ambang Bawah 300,000.00 300,000.00 Psg 300,000.00 229.41 300,229.41 300,229.41 300,200.00 L. Bajo
13 patch Fitting ambang Atas 300,000.00 300,000.00 Psg 300,000.00 229.41 300,229.41 300,229.41 300,200.00 L. Bajo
14 Kosen Aluminium (berwarna/anodized) 4' 245,000.00 245,000.00 M' 245,000.00 5,352.90 250,352.90 250,352.90 250,300.00 L. Bajo

15 Pintu Swing (Inc. Kusen, Daun Pintu Dan Aks.) 450,000.00 450,000.00 M' 450,000.00 5,352.90 455,352.90 455,352.90 455,300.00 L. Bajo
Jendela Swing UPVC (Incl. Kusen, Daun
16 380,000.00 380,000.00 M' 380,000.00 5,352.90 385,352.90 385,352.90 385,300.00 L. Bajo
Jendela Dan Aks.)
Jendela Sliding UPVC (Incl. Kusen, Daun
17 340,000.00 340,000.00 M' 340,000.00 5,352.90 345,352.90 345,352.90 345,300.00 L. Bajo
Jendela Dan Aks.)
18 Jendela Kaca Mati UPVC (Incl. Kusen, Daun Jendela Dan
310,000.00
Aks.) 310,000.00 M' 310,000.00 5,352.90 315,352.90 315,352.90 315,300.00 L. Bajo
19 Daun Pintu Alumunium Jalusi Kamar mandi 833,000.00 833,000.00 M2 833,000.00 5,352.90 838,352.90 838,352.90 838,300.00 L. Bajo
20 Braket Acp 5,000.00 5,000.00 Bh 5,000.00 229.41 5,229.41 5,229.41 5,200.00 L. Bajo
21 Handle Jendela Alumunium 30,000.00 30,000.00 bh 30,000.00 229.41 30,229.41 30,229.41 30,200.00 L. Bajo
22 Flush Handle Stainless Stell 250,000.00 250,000.00 bh 250,000.00 229.41 250,229.41 250,229.41 250,200.00 L. Bajo
23 Taco TH 325-Brown Kraftwood 62,147.00 62,147.00 M² 62,147.00 229.41 62,376.41 62,376.41 62,300.00 L. Bajo
24 Gerendel Pintu 40,000.00 40,000.00 Bh 40,000.00 229.41 40,229.41 40,229.41 40,200.00 L. Bajo
25 Kunci Tanam ex. Paori 350,000.00 350,000.00 Bh 350,000.00 229.41 350,229.41 350,229.41 350,200.00 L. Bajo
26 Hengsel Pintu 4 " Paori 69,000.00 69,000.00 Bh 69,000.00 229.41 69,229.41 69,229.41 69,200.00 L. Bajo
27 Hengsel Jendela 3" Paori 64,000.00 64,000.00 Bh 64,000.00 229.41 64,229.41 64,229.41 64,200.00 L. Bajo
28 Handle Pintu 450,000.00 450,000.00 Set 450,000.00 229.41 450,229.41 450,229.41 450,200.00 L. Bajo
29 Kait Angin 57,000.00 57,000.00 Bh 57,000.00 229.41 57,229.41 57,229.41 57,200.00 L. Bajo
30 Door Closer 400,000.00 400,000.00 Set 400,000.00 229.41 400,229.41 400,229.41 400,200.00 L. Bajo
31 Floor hinges ; Kualitas Baik ( No. 1) 1,800,000.00 1,800,000.00 Set 1,800,000.00 229.41 1,800,229.41 1,800,229.41 1,800,200.00 L. Bajo
32 Overpanel ; Kualitas Baik ( No. 1) 2,000,000.00 2,000,000.00 Set 2,000,000.00 229.41 2,000,229.41 2,000,229.41 2,000,200.00 L. Bajo
I Kaca - - - - - - - - -
1 Kaca Tempered tebal 12 mm 1,600,000.00 1,600,000.00 M² 1,600,000.00 16,058.71 1,616,058.71 1,616,058.71 1,616,000.00 L. Bajo
2 Kaca Tempered tebal 10 mm 1,400,000.00 1,400,000.00 M² 1,400,000.00 16,058.71 1,416,058.71 1,416,058.71 1,416,000.00 L. Bajo
3 Kaca Tempered tebal 8 mm 1,200,000.00 1,200,000.00 M² 1,200,000.00 16,058.71 1,216,058.71 1,216,058.71 1,216,000.00 L. Bajo
4 Kaca Panasap Glass 5 mm 300,000.00 300,000.00 M² 300,000.00 10,036.69 310,036.69 310,036.69 310,000.00 L. Bajo
5 Kaca Polos tebal 6 mm (clear) 290,000.00 290,000.00 M² 290,000.00 10,036.69 300,036.69 300,036.69 300,000.00 L. Bajo
6 Kaca Polos tebal 8 mm (clear) 320,000.00 320,000.00 M² 320,000.00 10,036.69 330,036.69 330,036.69 330,000.00 L. Bajo
7 Kaca tebal 8 mm (Dark Blue) 345,000.00 345,000.00 M² 345,000.00 10,036.69 355,036.69 355,036.69 355,000.00 L. Bajo
8 Kaca tebal 6 mm (Dark Blue) 320,000.00 320,000.00 M² 320,000.00 10,036.69 330,036.69 330,036.69 330,000.00 L. Bajo
9 Kopling Besar 310,000.00 310,000.00 M 310,000.00 229.41 310,229.41 310,229.41 310,200.00 L. Bajo
10 Silikon/sealant 80,000.00 80,000.00 Bh 80,000.00 160.59 80,160.59 80,160.59 80,100.00 L. Bajo
J Semen - - - - - - - - -
1 Semen Portland (40 Kg) 55,000.00 55,000.00 Zak 55,000.00 3,211.74 58,211.74 58,211.74 58,200.00 L. Bajo
2 Semen warna 15,000.00 15,000.00 Kg 15,000.00 80.29 15,080.29 15,080.29 15,000.00 L. Bajo
3 Semen MU 301 3,250.00 3,250.00 Kg 3,250.00 80.29 3,330.29 3,330.29 3,300.00 L. Bajo
4 Semen MU 270 (Untuk acian ) 7,200.00 7,200.00 Kg 7,200.00 80.29 7,280.29 7,280.29 7,200.00 L. Bajo
5 Semen MU 380 ( Untuk Perekat Bata ) 120,000.00 120,000.00 Kg 120,000.00 80.29 120,080.29 120,080.29 120,000.00 L. Bajo
6 Sika Waterproofing - - - - 80.29 80.29 80.29 - L. Bajo
7 Politur Jadi K Indian 75,000.00 75,000.00 Ltr 75,000.00 229.41 75,229.41 75,229.41 75,200.00 L. Bajo
8 Cornice/Compound 85,000.00 85,000.00 Zak 85,000.00 3,211.74 88,211.74 88,211.74 88,200.00 L. Bajo
9 Amplas/Kertas Pasir 10,000.00 10,000.00 Lbr 10,000.00 114.71 10,114.71 10,114.71 10,100.00 L. Bajo
10 Jointing Coumpound 15,000.00 15,000.00 Kg 15,000.00 80.29 15,080.29 15,080.29 15,000.00 L. Bajo
11 Joint Tape 3,500.00 3,500.00 M 3,500.00 0.23 3,500.23 3,500.23 3,500.00 L. Bajo
12 Lem Raja wali 25,000.00 25,000.00 Kg 25,000.00 229.41 25,229.41 25,229.41 25,200.00 L. Bajo
13 Alat bantu ( Mesin Bor Listrik) Genset - - Jam - 802,935.37 802,935.37 802,935.37 802,900.00 L. Bajo
14 Alat Sambung - - Bh - 802,935.37 802,935.37 802,935.37 802,900.00 L. Bajo
15 Multipleks 9 mm 150,000.00 150,000.00 Lbr 150,000.00 1,605.87 151,605.87 151,605.87 151,600.00 L. Bajo
16 Plywood tebal 9 mm 160,000.00 160,000.00 Lbr 160,000.00 1,605.87 161,605.87 161,605.87 161,600.00 L. Bajo
17 Tripleks 5 mm 95,000.00 95,000.00 Lbr 95,000.00 1,605.87 96,605.87 96,605.87 96,600.00 L. Bajo
18 Calsium 90,000.00 90,000.00 Kg 90,000.00 80.29 90,080.29 90,080.29 90,000.00 L. Bajo
19 Cornice/Compound 85,000.00 85,000.00 Kg 85,000.00 80.29 85,080.29 85,080.29 85,000.00 L. Bajo
20 Colton Plaster 90,000.00 90,000.00 Bh 90,000.00 1,605.87 91,605.87 91,605.87 91,600.00 L. Bajo
21 Tepung Gypsum 70,000.00 70,000.00 Kg 70,000.00 80.29 70,080.29 70,080.29 70,000.00 L. Bajo
K Sanitair - - - - - - - - -
1 Kloset Jongkok INA 330,000.00 330,000.00 Bh 330,000.00 8,029.35 338,029.35 338,029.35 338,000.00 L. Bajo
Pas Kloset Duduk American Standart complit
2 2,650,000.00 2,650,000.00 Bh 2,650,000.00 16,058.71 2,666,058.71 2,666,058.71 2,666,000.00 L. Bajo
Midle Sofer + Tabung
3 Kloset Duduk Tanpa Tabung INA 750,000.00 750,000.00 Bh 750,000.00 16,058.71 766,058.71 766,058.71 766,000.00 L. Bajo
4 Anodised Aluminium U/F Channel 12 mm 41,667.00 41,667.00 M 41,667.00 802.94 42,469.94 42,469.94 42,400.00 L. Bajo
5 Aluminium Top Rail 91,667.00 91,667.00 M 91,667.00 802.94 92,469.94 92,469.94 92,400.00 L. Bajo
6 Coat Hook 15,000.00 15,000.00 Bh 15,000.00 229.41 15,229.41 15,229.41 15,200.00 L. Bajo
7 Door Knob 65,000.00 65,000.00 Bh 65,000.00 229.41 65,229.41 65,229.41 65,200.00 L. Bajo
8 Thumb-Turn & Indikator 95,000.00 95,000.00 Bh 95,000.00 229.41 95,229.41 95,229.41 95,200.00 L. Bajo
9 Gravity Hinge 80,000.00 80,000.00 Psg 80,000.00 229.41 80,229.41 80,229.41 80,200.00 L. Bajo
10 Bottom Pedestal 120,000.00 120,000.00 Bh 120,000.00 229.41 120,229.41 120,229.41 120,200.00 L. Bajo
11 Polyamide Top Rail End Cap 15,000.00 15,000.00 Bh 15,000.00 802.94 15,802.94 15,802.94 15,800.00 L. Bajo
12 Aluminium Door Stopper Channel 25,000.00 25,000.00 M 25,000.00 802.94 25,802.94 25,802.94 25,800.00 L. Bajo
13 GRC Board 12 mm 310,000.00 310,000.00 Lbr 310,000.00 1,605.87 311,605.87 311,605.87 311,600.00 L. Bajo
14 Water Heater 15 Liter 2,615,000.00 2,615,000.00 Bh 2,615,000.00 16,058.71 2,631,058.71 2,631,058.71 2,631,000.00 L. Bajo
15 Shower + Kran air Double Pipe 2,321,000.00 2,321,000.00 Bh 2,321,000.00 16,058.71 2,337,058.71 2,337,058.71 2,337,000.00 L. Bajo

16 Wastafel Lengkap Asesories Amerikan standart 1,200,000.00 1,200,000.00 Bh 1,200,000.00 8,029.35 1,208,029.35 1,208,029.35 1,208,000.00 L. Bajo

17 Urinoir American Standar 1,850,000.00 1,850,000.00 Bh 1,850,000.00 8,029.35 1,858,029.35 1,858,029.35 1,858,000.00 L. Bajo
18 Dispenser sabun manual/Hand Soap Oil 53,000.00 53,000.00 Bh 53,000.00 1,605.87 54,605.87 54,605.87 54,600.00 L. Bajo
19 Kotak Tisu 158,000.00 158,000.00 Bh 158,000.00 45.88 158,045.88 158,045.88 158,000.00 L. Bajo
20 Hanger Besi Stenliss - - Bh - 45.88 45.88 45.88 - L. Bajo
21 Sofer - - Bh - 45.88 45.88 45.88 - L. Bajo
22 Floor Draine 65,000.00 65,000.00 Bh 65,000.00 45.88 65,045.88 65,045.88 65,000.00 L. Bajo
23 Stop kran Ø 1" 135,000.00 135,000.00 Bh 135,000.00 45.88 135,045.88 135,045.88 135,000.00 L. Bajo
24 Stop Kran Air Biasa PVC Ø 1/2" 20,000.00 20,000.00 Bh 20,000.00 45.88 20,045.88 20,045.88 20,000.00 L. Bajo
Handrail Paloma BAP 1524 Corina BTH GRB =
25 450,000.00 450,000.00 unit 450,000.00 45.88 450,045.88 450,045.88 450,000.00 L. Bajo
50CM

26 Pipa Hawa ( P=1.00 M ) GIP 1.5" + Complit - - Bh - 617.64 617.64 617.64 600.00 L. Bajo

27 Pipa PVC AW ø 1/2" 8,750.00 8,750.00 M' 8,750.00 38.24 8,788.24 8,788.24 8,700.00 L. Bajo
28 Pipa PVC AW ø 3/4" 11,250.00 11,250.00 M' 11,250.00 50.18 11,300.18 11,300.18 11,300.00 L. Bajo
29 Pipa PVC AW ø 1" 16,250.00 16,250.00 M' 16,250.00 80.29 16,330.29 16,330.29 16,300.00 L. Bajo
30 Pipa PVC AW ø 1 1/2" 30,000.00 30,000.00 M' 30,000.00 80.29 30,080.29 30,080.29 30,000.00 L. Bajo
31 Pipa PVC AW ø 4" 107,500.00 107,500.00 M' 107,500.00 535.29 108,035.29 108,035.29 108,000.00 L. Bajo
32 Pipa PVC AW ø 2 " 37,500.00 37,500.00 M' 37,500.00 160.59 37,660.59 37,660.59 37,600.00 L. Bajo
33 Pipa PVC AW ø 3 " 64,500.00 64,500.00 M' 64,500.00 401.47 64,901.47 64,901.47 64,900.00 L. Bajo
34 Isolasi Pipa/Sealtape 10,000.00 10,000.00 Bh 10,000.00 11.47 10,011.47 10,011.47 10,000.00 L. Bajo
35 Clean Out Ø 3" (Stainless stell) 176,800.00 176,800.00 Bh 176,800.00 229.41 177,029.41 177,029.41 177,000.00 L. Bajo
L Mekanikal Elektrikal - - - - - - - - -
1 Tee dos ( Listrik ) 5,000.00 5,000.00 Bh 5,000.00 22.94 5,022.94 5,022.94 5,000.00 L. Bajo

2 Biaya Penyambungan Daya Listrik 23000 Watt - - Watt - - - - - -

3 Top patch fitting ; Kualitas Baik ( No. 1) Broco 23,000.00 23,000.00 Set 23,000.00 22.94 23,022.94 23,022.94 23,000.00 L. Bajo

4 Bottom patch fitting ; Kualitas Baik ( No. 1) - - Set - 22.94 22.94 22.94 - L. Bajo

Bottom patch lock + cylinder ; Kualitas Baik (


5 - - Set - 22.94 22.94 22.94 - L. Bajo
No. 1)
6 Pull handle ; Kualitas Baik ( No. 1) - - Set - 22.94 22.94 22.94 - L. Bajo
Kabel Listrik NYM 3 x 2.5 mm ( Standart PLN
7 22,000.00 22,000.00 M' 22,000.00 32.12 22,032.12 22,032.12 22,000.00 L. Bajo
) Eterna
Kabel Listrik NYM 2 x 2.5 mm ( Standart PLN
8 17,000.00 17,000.00 M' 17,000.00 38.24 17,038.24 17,038.24 17,000.00 L. Bajo
) Eterna
9 Pipa Listrik 5/8 " 13,000.00 13,000.00 Btg 13,000.00 152.94 13,152.94 13,152.94 13,100.00 L. Bajo
10 Saklar Tunggal Bronco Super 40,000.00 40,000.00 Bh 40,000.00 22.94 40,022.94 40,022.94 40,000.00 L. Bajo
11 Saklar Ganda Bronco Super 46,000.00 46,000.00 Bh 46,000.00 22.94 46,022.94 46,022.94 46,000.00 L. Bajo
12 Stop Contak Bronco Super 34,000.00 34,000.00 Bh 34,000.00 22.94 34,022.94 34,022.94 34,000.00 L. Bajo
13 Fitting Tanam (Brocco/stara ) 20,000.00 20,000.00 Bh 20,000.00 22.94 20,022.94 20,022.94 20,000.00 L. Bajo
14 Lampu Downlight 18 Watt 131,000.00 131,000.00 Bh 131,000.00 57.35 131,057.35 131,057.35 131,000.00 L. Bajo
15 Lampu Philips Spiral 20 Watt 65,000.00 65,000.00 Bh 65,000.00 57.35 65,057.35 65,057.35 65,000.00 L. Bajo
16 Fitting Tempel ( Broco /Stara ) 20,000.00 20,000.00 Bh 20,000.00 22.94 20,022.94 20,022.94 20,000.00 L. Bajo
17 MCB Group 16 A ex Broco 50,000.00 50,000.00 Bh 50,000.00 151.50 50,151.50 50,151.50 50,100.00 L. Bajo
18 MCB Group 6 A ex Broco 65,000.00 65,000.00 Bh 65,000.00 151.50 65,151.50 65,151.50 65,100.00 L. Bajo

19 Panel Box Control Server uk. 40x50x20 cm 600,000.00 600,000.00 Unit 600,000.00 80.29 600,080.29 600,080.29 600,000.00 L. Bajo

20 Panel Box Control Server uk. 20x30x12 cm 240,000.00 240,000.00 Bh 240,000.00 80.29 240,080.29 240,080.29 240,000.00 L. Bajo

21 Lampu panel box control server - - Bh - 11.47 11.47 11.47 - L. Bajo


22 Plat rell MCB Box Control - - Bh - 28.68 28.68 28.68 - L. Bajo
23 Panel Box 4 MCB - - Bh - 160.59 160.59 160.59 100.00 L. Bajo

24 Lampu Emergency Nicad Batteray 20 Watt - - Bh - 138.44 138.44 138.44 100.00 L. Bajo

Lampu RM Artolite Passat CL 2x18 watt M5


25 - - Bh - 229.41 229.41 229.41 200.00 L. Bajo
White; Out Bow
26 L Bow Ø 5/8" 2,000.00 2,000.00 Bh 2,000.00 22.94 2,022.94 2,022.94 2,000.00 L. Bajo
27 Klem pipa Listrik Ø 5/8" 2,000.00 2,000.00 Bh 2,000.00 22.94 2,022.94 2,022.94 2,000.00 L. Bajo
28 Fhiser 1,500.00 1,500.00 Bh 1,500.00 160.59 1,660.59 1,660.59 1,600.00 L. Bajo
29 Las Dop Listrik 1,500.00 1,500.00 Bh 1,500.00 160.59 1,660.59 1,660.59 1,600.00 L. Bajo
30 Mata tombak EF, - - Bh - 200.73 200.73 200.73 200.00 L. Bajo
31 pipa PVC AW Ø 1" 16,250.00 16,250.00 M' 16,250.00 80.29 16,330.29 16,330.29 16,300.00 L. Bajo
32 Kabel BC 10 mm, dengan Pipa Konduit - - M' - 38.24 38.24 38.24 - L. Bajo
33 Grounding didalam arde - - Unit - 267.65 267.65 267.65 200.00 L. Bajo
34 Kotak teks dan acceroies - - Bh - 1,384.37 1,384.37 1,384.37 1,300.00 L. Bajo
35 AC Panasonic 2 1/2 PK - - Bh - 8,029.35 8,029.35 8,029.35 8,000.00 L. Bajo
36 AC Panasonic 2 PK - - Bh - 8,029.35 8,029.35 8,029.35 8,000.00 L. Bajo
37 AC Panasonic 1 1/2 PK - - Bh - 8,029.35 8,029.35 8,029.35 8,000.00 L. Bajo
38 AC Panasonic 1 PK - - Bh - 8,029.35 8,029.35 8,029.35 8,000.00 L. Bajo
39 AC Panasonic 3/4 PK - - Bh - 8,029.35 8,029.35 8,029.35 8,000.00 L. Bajo
40 AC Panasonic 1/2 PK - - Bh - 8,029.35 8,029.35 8,029.35 8,000.00 L. Bajo
41 Gas Refrigerent ( Fereon AC ) R22/R407 - - Kg - 229.41 229.41 229.41 200.00 L. Bajo

42 Dudukan Unit outdoor, bracket, Penggantung dll - - Set - 22.94 22.94 22.94 - L. Bajo

Sewa alat-alat bantu, steger kerja, Pengukuran


43 - - Ls - - - - - -
dll
Pemasangan Pipa Refrigerant, (in-out), Pipa
44 - - Unit - 2,294.10 2,294.10 2,294.10 2,200.00 L. Bajo
Drain AC PVC AW, Isolasi Poliurethane
45 Handle Jendela 42,000.00 42,000.00 Bh 42,000.00 229.41 42,229.41 42,229.41 42,200.00 L. Bajo
46 Bak Cuci Satinless Steel 480,000.00 480,000.00 Bh 480,000.00 5,352.90 485,352.90 485,352.90 485,300.00 L. Bajo
47 Bidet /Sofer + Selang Move 115,000.00 115,000.00 Set 115,000.00 104.28 115,104.28 115,104.28 115,100.00 L. Bajo
48 Profil Tank Pinguin 2000 Liter Stainless 6,500,000.00 6,500,000.00 Bh 6,500,000.00 80,293.40 6,580,293.40 6,580,293.40 6,580,200.00 L. Bajo
49 Sanyo Sumur Dangkal ( Automatic ) 750,000.00 750,000.00 Bh 750,000.00 16,058.71 766,058.71 766,058.71 766,000.00 L. Bajo
50 Water Booster - - Bh - 16,058.71 16,058.71 16,058.71 16,000.00 L. Bajo
51 Grease Trap Stainless - - Bh - 16,058.71 16,058.71 16,058.71 16,000.00 L. Bajo
PEKERJAAN PENARIKAN KABEL
KABEL FEEDER
1 Kabel FRC 4 x 10 mm2 356,000.00 356,000.00 M 356,000.00 - 356,000.00 356,000.00 356,000.00 L. Bajo
2 Kabel FRC 4 x 150 mm2 3,605,000.00 3,605,000.00 M 3,605,000.00 - 3,605,000.00 3,605,000.00 3,605,000.00 L. Bajo
3 Kabel FRC 4 x 70 mm2 1,760,000.00 1,760,000.00 M 1,760,000.00 - 1,760,000.00 1,760,000.00 1,760,000.00 L. Bajo
4 Kabel FRC 4 x 4 mm2 185,000.00 185,000.00 M 185,000.00 - 185,000.00 185,000.00 185,000.00 L. Bajo
5 Kabel FRC 4 x 16 mm2 504,000.00 504,000.00 M 504,000.00 - 504,000.00 504,000.00 504,000.00 L. Bajo
6 Kabel NYFGbY 4 x 240 mm2 1,817,000.00 1,817,000.00 M 1,817,000.00 - 1,817,000.00 1,817,000.00 1,817,000.00 L. Bajo
7 Kabel NYY 4 x 240 mm2 1,779,000.00 1,779,000.00 M 1,779,000.00 - 1,779,000.00 1,779,000.00 1,779,000.00 L. Bajo
8 Kabel NYFGbY 4 x 70 mm2 533,500.00 533,500.00 M 533,500.00 - 533,500.00 533,500.00 533,500.00 L. Bajo
9 Kabel NYFGbY 4 x 35 mm2 289,000.00 289,000.00 M 289,000.00 - 289,000.00 289,000.00 289,000.00 L. Bajo
10 Kabel NYFGbY 4 x 25 mm2 225,000.00 225,000.00 M 225,000.00 - 225,000.00 225,000.00 225,000.00 L. Bajo
11 Kabel NYFGbY 4 x 16 mm2 144,500.00 144,500.00 M 144,500.00 - 144,500.00 144,500.00 144,500.00 L. Bajo
12 Kabel NYFGbY 4 x 10 mm2 123,600.00 123,600.00 M 123,600.00 - 123,600.00 123,600.00 123,600.00 L. Bajo
13 Kabel NYFGbY 4 x 6 mm2 86,200.00 86,200.00 M 86,200.00 - 86,200.00 86,200.00 86,200.00 L. Bajo
14 Kabel NYFGbY 4 x 4 mm2 66,100.00 66,100.00 M 66,100.00 - 66,100.00 66,100.00 66,100.00 L. Bajo
15 Kabel NYY 4 x 95 mm2 698,500.00 698,500.00 M 698,500.00 - 698,500.00 698,500.00 698,500.00 L. Bajo
16 Kabel NYY 4 x 50 mm2 357,500.00 357,500.00 M 357,500.00 - 357,500.00 357,500.00 357,500.00 L. Bajo
17 Kabel FRC 4 x 50 mm2 1,280,000.00 1,280,000.00 M 1,280,000.00 - 1,280,000.00 1,280,000.00 1,280,000.00 L. Bajo
18 Kabel NYY 4 x 35 mm2 269,000.00 269,000.00 M 269,000.00 - 269,000.00 269,000.00 269,000.00 L. Bajo
19 Kabel NYY 4 x 25 mm3 197,500.00 197,500.00 M 197,500.00 - 197,500.00 197,500.00 197,500.00 L. Bajo
20 Kabel NYY 4 x 16 mm2 128,000.00 128,000.00 M 128,000.00 - 128,000.00 128,000.00 128,000.00 L. Bajo
21 Kabel NYY 4 x 10 mm2 93,800.00 93,800.00 M 93,800.00 - 93,800.00 93,800.00 93,800.00 L. Bajo
22 Kabel NYY 4 x 6 mm2 58,500.00 58,500.00 M 58,500.00 - 58,500.00 58,500.00 58,500.00 L. Bajo
23 Kabel NYY 4 x 4 mm2 42,000.00 42,000.00 M 42,000.00 - 42,000.00 42,000.00 42,000.00 L. Bajo
KABEL INSTALASI
1 Kabel NYFGbY 2 x 2.5 mm2 33,100.00 33,100.00 M 33,100.00 - 33,100.00 33,100.00 33,100.00 L. Bajo
2 Kabel NYFGbY 3 x 2,5 mm3 38,800.00 38,800.00 M 38,800.00 - 38,800.00 38,800.00 38,800.00 L. Bajo
3 Kabel NYFGbY 2 x 6 mm4 53,200.00 53,200.00 M 53,200.00 - 53,200.00 53,200.00 53,200.00 L. Bajo
4 Kabel NYA 2 x 2.5 mm2 10,200.00 10,200.00 M 10,200.00 - 10,200.00 10,200.00 10,200.00 L. Bajo
5 Kabel NYA 3 x 2.5 mm2 15,300.00 15,300.00 M 15,300.00 - 15,300.00 15,300.00 15,300.00 L. Bajo
6 Kabel NYA 70 mm2 81,000.00 81,000.00 M 81,000.00 - 81,000.00 81,000.00 81,000.00 L. Bajo
7 Kabel NYY 3 x 2,5 mm2 38,800.00 38,800.00 M 38,800.00 - 38,800.00 38,800.00 38,800.00 L. Bajo
8 Kabel NYY 3 x 4 mm2 53,200.00 53,200.00 M 53,200.00 - 53,200.00 53,200.00 53,200.00 L. Bajo
9 Kabel NYM 3 x 2,5 mm2 16,000.00 16,000.00 M 16,000.00 - 16,000.00 16,000.00 16,000.00 L. Bajo
10 Kabel NYM 2 x 2,5 mm3 13,000.00 13,000.00 M 13,000.00 - 13,000.00 13,000.00 13,000.00 L. Bajo
11 Kabel NYM 4 x 4 mm2 37,800.00 37,800.00 M 37,800.00 - 37,800.00 37,800.00 37,800.00 L. Bajo
12 Kabel NYMHY 4 x 2,5 mm2 29,400.00 29,400.00 M 29,400.00 - 29,400.00 29,400.00 29,400.00 L. Bajo
KABEL GROUNDING TERPASANG
1 Kabel BC 240 mm2 245,000.00 245,000.00 M 245,000.00 - 245,000.00 245,000.00 245,000.00 L. Bajo
2 Kabel BC 185 mm2 194,800.00 194,800.00 M 194,800.00 - 194,800.00 194,800.00 194,800.00 L. Bajo
3 Kabel BC 150 mm2 153,000.00 153,000.00 M 153,000.00 - 153,000.00 153,000.00 153,000.00 L. Bajo
4 Kabel BC 120 mm2 93,200.00 93,200.00 M 93,200.00 - 93,200.00 93,200.00 93,200.00 L. Bajo
5 Kabel BC 95 mm2 78,800.00 78,800.00 M 78,800.00 - 78,800.00 78,800.00 78,800.00 L. Bajo
6 Kabel BC 70 mm2 60,775.00 60,775.00 M 60,775.00 - 60,775.00 60,775.00 60,700.00 L. Bajo
7 Kabel BC 50 mm2 45,045.00 45,045.00 M 45,045.00 - 45,045.00 45,045.00 45,000.00 L. Bajo
8 Kabel BC 35 mm2 32,175.00 32,175.00 M 32,175.00 - 32,175.00 32,175.00 32,100.00 L. Bajo
9 Kabel BC 25 mm2 22,880.00 22,880.00 M 22,880.00 - 22,880.00 22,880.00 22,800.00 L. Bajo
10 Kabel BC 16 mm2 15,015.00 15,015.00 M 15,015.00 - 15,015.00 15,015.00 15,000.00 L. Bajo
11 Kabel BC 10 mm2 9,009.00 9,009.00 M 9,009.00 - 9,009.00 9,009.00 9,000.00 L. Bajo
12 Kabel BC 6 mm2 5,863.00 5,863.00 M 5,863.00 - 5,863.00 5,863.00 5,800.00 L. Bajo
13 Kabel BC 4 mm2 3,900.00 3,900.00 M 3,900.00 - 3,900.00 3,900.00 3,900.00 L. Bajo

PEKERJAAN PEMASANGAN LAMPU


LAMPU
Lampu RM 300 3X18W ACR SAVY,T LED
1 1,520,503.00 1,520,503.00 Bh 1,520,503.00 - 1,520,503.00 1,520,503.00 1,520,500.00 L. Bajo
ESS 3 X 8W
2 Lampu RM 300 ACR 3X18W/54 + BATT 2,041,200.00 2,041,200.00 Bh 2,041,200.00 - 2,041,200.00 2,041,200.00 2,041,200.00 L. Bajo
Lampu RM 300 2X18W ACR SAVY ,T LED
3 923,256.00 923,256.00 Bh 923,256.00 - 923,256.00 923,256.00 923,200.00 L. Bajo
ESS 2 X 8W
Lampu RM 300 2X18W ACR SAVY T LED 2
4 2,647,900.00 2,647,900.00 Bh 2,647,900.00 - 2,647,900.00 2,647,900.00 2,647,900.00 L. Bajo
X 8W + BATT
5 BARET SCB 20 ACR 11,5 W 477,500.00 477,500.00 Bh 477,500.00 - 477,500.00 477,500.00 477,500.00 L. Bajo
6 BARET SCB 20 ACR LED KTK 24W + BATT 2,470,425.00 2,470,425.00 Bh 2,470,425.00 - 2,470,425.00 2,470,425.00 2,470,400.00 L. Bajo

Down Light RD 125 E 27 SAVY LED BULB


7 120,000.00 120,000.00 Bh 120,000.00 - 120,000.00 120,000.00 120,000.00 L. Bajo
6,5-60W
Lampu RM 300 2X18W M2 SAVY ,T LED
8 833,474.00 833,474.00 Bh 833,474.00 - 833,474.00 833,474.00 833,400.00 L. Bajo
ESS 2 X 8W
Down Light RD 150 E 27 SAVY LED BULB
9 150,000.00 150,000.00 Bh 150,000.00 - 150,000.00 150,000.00 150,000.00 L. Bajo
10,5-85W
TK CG 1X36W SAVY T LED ESS 1 X
10 430,037.00 430,037.00 Bh 430,037.00 - 430,037.00 430,037.00 430,000.00 L. Bajo
14,5W 1600lm

11 Lampu Taman GL TOP TRP T 27 PL ESS 35W 2,171,100.00 2,171,100.00 Bh 2,171,100.00 - 2,171,100.00 2,171,100.00 2,171,100.00 L. Bajo

Lampu RM 300 2X36W M2 SAVY ,T LED


12 1,276,238.00 1,276,238.00 Bh 1,276,238.00 - 1,276,238.00 1,276,238.00 1,276,200.00 L. Bajo
ESS 2 X 14,5W
WATHERPROOF ELEKTRA,PC 1X36,T-
13 2,976,238.00 2,976,238.00 Bh 2,976,238.00 - 2,976,238.00 2,976,238.00 2,976,200.00 L. Bajo
LED ESST.1X16W+BATT.
RM 300 2X36 ACR SAVY, T LED ESS
14 862,000.00 862,000.00 Bh 862,000.00 - 862,000.00 862,000.00 862,000.00 L. Bajo
2X14,5W
RM 300 2X36W ACR SAVY T LED 2 X 16W
15 3,078,525.00 3,078,525.00 Bh 3,078,525.00 - 3,078,525.00 3,078,525.00 3,078,500.00 L. Bajo
+BATT.
Lampu Strip Light indoor 10-77W ( 10 m) life
16 343,980.00 343,980.00 Bh 343,980.00 - 343,980.00 343,980.00 343,900.00 L. Bajo
time 50.000 jam + trafo
Down Light Outbow chotac 150 E 27 LED
17 373,700.00 373,700.00 Bh 373,700.00 - 373,700.00 373,700.00 373,700.00 L. Bajo
BULB 8-70W
18 EXIT LED AL 1MKHUGO (komplet set) 1,403,804.00 1,403,804.00 Bh 1,403,804.00 - 1,403,804.00 1,403,804.00 1,403,800.00 L. Bajo
19 Lampu sorot LED 80W (set) 3,494,300.00 3,494,300.00 Bh 3,494,300.00 - 3,494,300.00 3,494,300.00 3,494,300.00 L. Bajo
20 Lampu sorot pohon morisca 50w 560,900.00 560,900.00 Bh 560,900.00 - 560,900.00 560,900.00 560,900.00 L. Bajo
21 Lampu PJU led 80W + Tiang 7m+fondasi 9,277,626.00 9,277,626.00 Bh 9,277,626.00 - 9,277,626.00 9,277,626.00 9,277,600.00 L. Bajo
22 Stop Kontak 15,600.00 15,600.00 Bh 15,600.00 - 15,600.00 15,600.00 15,600.00 L. Bajo
23 Stop Kontak Lantai(3 MODUL) 759,500.00 759,500.00 Bh 759,500.00 - 759,500.00 759,500.00 759,500.00 L. Bajo
24 Sakelar Ganda 22,500.00 22,500.00 Bh 22,500.00 - 22,500.00 22,500.00 22,500.00 L. Bajo
25 Sakelar Tunggal 11,900.00 11,900.00 Bh 11,900.00 - 11,900.00 11,900.00 11,900.00 L. Bajo
26 Sakelar Hotel 14,500.00 14,500.00 Bh 14,500.00 - 14,500.00 14,500.00 14,500.00 L. Bajo
27 Sakelar Cam/Handle 57,500.00 57,500.00 Bh 57,500.00 - 57,500.00 57,500.00 57,500.00 L. Bajo
BAHAN INSTALASI
1 Kabel, NYM 3 x 2,5 mm2 ( Ex Supreme ) 13,000.00 13,000.00 M 13,000.00 - 13,000.00 13,000.00 13,000.00 L. Bajo
2 Pipa Conduit 20MM 3,500.00 3,500.00 M 3,500.00 - 3,500.00 3,500.00 3,500.00 L. Bajo
3 In Bow Doos 1,950.00 1,950.00 Bh 1,950.00 - 1,950.00 1,950.00 1,900.00 L. Bajo
4 Tee Doos 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
5 Klem Pipa 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
6 Fhiser 1,500.00 1,500.00 Bh 1,500.00 - 1,500.00 1,500.00 1,500.00 L. Bajo
7 Las Doop 500.00 500.00 Bh 500.00 - 500.00 500.00 500.00 L. Bajo
8 Isolasi 5,000.00 5,000.00 Bh 5,000.00 - 5,000.00 5,000.00 5,000.00 L. Bajo

PEKERJAAN PEMASANGAN PANEL


PANEL
1 Panel 80 x 200 x 70 cm Standing Floor 7,500,000.00 7,500,000.00 Unit 7,500,000.00 - 7,500,000.00 7,500,000.00 7,500,000.00 L. Bajo
2 Panel 80 x 180 x 70 cm Standing Floor 6,000,000.00 6,000,000.00 Unit 6,000,000.00 - 6,000,000.00 6,000,000.00 6,000,000.00 L. Bajo
3 Panel 80 x 120 x 30 cm wall mounted 2,500,000.00 2,500,000.00 Unit 2,500,000.00 - 2,500,000.00 2,500,000.00 2,500,000.00 L. Bajo
4 Panel 70 x 110 x 30 cm wall mounted 2,250,000.00 2,250,000.00 Unit 2,250,000.00 - 2,250,000.00 2,250,000.00 2,250,000.00 L. Bajo
5 Panel 60 x 80 x 30 cm wall mounted 2,000,000.00 2,000,000.00 Unit 2,000,000.00 - 2,000,000.00 2,000,000.00 2,000,000.00 L. Bajo
6 Panel 40 x 60 x 25 cm wall mounted 1,800,000.00 1,800,000.00 Unit 1,800,000.00 - 1,800,000.00 1,800,000.00 1,800,000.00 L. Bajo
7 Panel 30 x 40 x 20 cm wall mounted 1,400,000.00 1,400,000.00 Unit 1,400,000.00 - 1,400,000.00 1,400,000.00 1,400,000.00 L. Bajo
8 Panel PJU 40 x 60 x 25 cm outdoor 1,250,000.00 1,250,000.00 Unit 1,250,000.00 - 1,250,000.00 1,250,000.00 1,250,000.00 L. Bajo
9 Box Hager 4 group 221,700.00 221,700.00 Unit 221,700.00 - 221,700.00 221,700.00 221,700.00 L. Bajo
10 Box Hager 6 group 258,000.00 258,000.00 Unit 258,000.00 - 258,000.00 258,000.00 258,000.00 L. Bajo
11 Box Hager 8 group 280,000.00 280,000.00 Ttk 280,000.00 - 280,000.00 280,000.00 280,000.00 L. Bajo
ACCESSORIS

1 Lampu Indikator 3 warna (Telemekanic) + fuse 115,000.00 115,000.00 Bh 115,000.00 - 115,000.00 115,000.00 115,000.00 L. Bajo

2 Selector Switch Volt meter, 7 posisi 500,000.00 500,000.00 Bh 500,000.00 - 500,000.00 500,000.00 500,000.00 L. Bajo
3 Ampere meter, Skala 400 A (GAE) 445,500.00 445,500.00 Bh 445,500.00 - 445,500.00 445,500.00 445,500.00 L. Bajo
4 Volt Meter AC 220 / 380 V (GAE) 415,000.00 415,000.00 Bh 415,000.00 - 415,000.00 415,000.00 415,000.00 L. Bajo
5 Cos φ meter 450,000.00 450,000.00 Bh 450,000.00 - 450,000.00 450,000.00 450,000.00 L. Bajo
6 Frequensi Meter 48-52 LED (GAE) 517,000.00 517,000.00 Bh 517,000.00 - 517,000.00 517,000.00 517,000.00 L. Bajo
7 kWH Meter 3 fasa 3,800,000.00 3,800,000.00 Bh 3,800,000.00 - 3,800,000.00 3,800,000.00 3,800,000.00 L. Bajo
8 CT 1000/5 781,000.00 781,000.00 Bh 781,000.00 - 781,000.00 781,000.00 781,000.00 L. Bajo
9 CT 500/5 461,000.00 461,000.00 Bh 461,000.00 - 461,000.00 461,000.00 461,000.00 L. Bajo
10 CT 100/5 315,000.00 315,000.00 Bh 315,000.00 - 315,000.00 315,000.00 315,000.00 L. Bajo
11 Timer Switch + kontaktor 934,800.00 934,800.00 Bh 934,800.00 - 934,800.00 934,800.00 934,800.00 L. Bajo
BAHAN INSTALASI
1 Pipa Spitzen / tembaga dia 1 1/2 " 250,000.00 250,000.00 Ljr 250,000.00 - 250,000.00 250,000.00 250,000.00 L. Bajo
2 Kawat BC 70 46,750.00 46,750.00 M 46,750.00 - 46,750.00 46,750.00 46,700.00 L. Bajo
3 Kawat BC 35 24,750.00 24,750.00 M 24,750.00 - 24,750.00 24,750.00 24,700.00 L. Bajo
4 klem tembaga 75,000.00 75,000.00 Bh 75,000.00 - 75,000.00 75,000.00 75,000.00 L. Bajo
5 shock besi dia 1 1/2' 5,000.00 5,000.00 Bh 5,000.00 - 5,000.00 5,000.00 5,000.00 L. Bajo
6 Bak kontrol 40 x 40 lengkap 500,000.00 500,000.00 Unit 500,000.00 - 500,000.00 500,000.00 500,000.00 L. Bajo

ACB, MCCB DAN MCB


MCCB

1 MCCB NS Micrologic 5.1 320-800 A/3P/70ka 14,500,000.00 14,500,000.00 Bh 14,500,000.00 - 14,500,000.00 14,500,000.00 14,500,000.00 L. Bajo

MCCB 100, 125, 160, 200, 225, 250 A /3 P/36


2 1,800,000.00 1,800,000.00 Bh 1,800,000.00 - 1,800,000.00 1,800,000.00 1,800,000.00 L. Bajo
kA
MCCB 15, 20, 25, 30, 40, 50, 60, 75, 80, 100
3 938,000.00 938,000.00 Bh 938,000.00 - 938,000.00 938,000.00 938,000.00 L. Bajo
A /3 P/30 kA
MCCB 100, 125, 160, 200, 225, 250 A /3 P/25
4 1,731,000.00 1,731,000.00 Bh 1,731,000.00 - 1,731,000.00 1,731,000.00 1,731,000.00 L. Bajo
kA
MCCB 100, 125, 160, 200, 225, 250 A /3 P/18
5 1,385,000.00 1,385,000.00 Bh 1,385,000.00 - 1,385,000.00 1,385,000.00 1,385,000.00 L. Bajo
kA
MCCB 15, 20, 25, 30, 40, 50, 60, 75, 80, 100
6 797,500.00 797,500.00 Bh 797,500.00 - 797,500.00 797,500.00 797,500.00 L. Bajo
A /3 P/18 kA

MCB 3 PHASE
1 MCB 25, 32, 40A/3P/6 KA 269,000.00 269,000.00 Bh 269,000.00 - 269,000.00 269,000.00 269,000.00 L. Bajo
2 MCB 6, 10, 16, 20A/3P/6 KA 240,000.00 240,000.00 Bh 240,000.00 - 240,000.00 240,000.00 240,000.00 L. Bajo
3 MCB 25, 32, 40 A/3P/4,5 KA 245,000.00 245,000.00 Bh 245,000.00 - 245,000.00 245,000.00 245,000.00 L. Bajo
4 MCB 6, 10, 16, 20A/3P/4,5 KA 222,000.00 222,000.00 Bh 222,000.00 - 222,000.00 222,000.00 222,000.00 L. Bajo

MCB 1 PHASE
1 MCB 50, 63A/1P/4.5 KA 136,000.00 136,000.00 Bh 136,000.00 - 136,000.00 136,000.00 136,000.00 L. Bajo
2 MCB 2, 4, 6,10,16 ,20, 25, 32, 40A/1P/4.5 KA 62,500.00 62,500.00 Bh 62,500.00 - 62,500.00 62,500.00 62,500.00 L. Bajo

PEKERJAAN PEMASANGAN AIR CONDITIONER & EXHAUST FAN


AC
1 AC 2 PK Split Wall Mounted 13,000,000.00 13,000,000.00 Unit 13,000,000.00 - 13,000,000.00 13,000,000.00 13,000,000.00 L. Bajo
2 AC 5 PK Ceiling Cassete 20,000,000.00 20,000,000.00 Unit 20,000,000.00 - 20,000,000.00 20,000,000.00 20,000,000.00 L. Bajo
3 AC 3 PK Ceiling Cassete 15,000,000.00 15,000,000.00 Unit 15,000,000.00 - 15,000,000.00 15,000,000.00 15,000,000.00 L. Bajo
4 AC 2,5 PK Ceiling Cassete 19,750,000.00 19,750,000.00 Unit 19,750,000.00 - 19,750,000.00 19,750,000.00 19,750,000.00 L. Bajo
5 AC 2,5 PK Split Wall Mounted 19,750,000.00 19,750,000.00 Unit 19,750,000.00 - 19,750,000.00 19,750,000.00 19,750,000.00 L. Bajo
6 AC 1.5 PK Split Wall Mounted 10,500,000.00 10,500,000.00 Unit 10,500,000.00 - 10,500,000.00 10,500,000.00 10,500,000.00 L. Bajo
7 AC 1 PK Split Wall Mounted 6,750,000.00 6,750,000.00 Unit 6,750,000.00 - 6,750,000.00 6,750,000.00 6,750,000.00 L. Bajo
8 AC 3/4 PK Split Wall Mounted 2,500,000.00 2,500,000.00 Unit 2,500,000.00 - 2,500,000.00 2,500,000.00 2,500,000.00 L. Bajo
9 AC 2 PK Ceiling Cassete 12,000,000.00 12,000,000.00 Unit 12,000,000.00 - 12,000,000.00 12,000,000.00 12,000,000.00 L. Bajo
10 Ceiling Concealed (High Static) 29,834,200.00 29,834,200.00 Unit 29,834,200.00 - 29,834,200.00 29,834,200.00 29,834,200.00 L. Bajo
11 95900 BTU/H
12 Outdoor Multi-V IV 49,129,300.00 49,129,300.00 Unit 49,129,300.00 - 49,129,300.00 49,129,300.00 49,129,300.00 L. Bajo
13 95900 BTU/H

EXHAUST FAN
1 Exhaust fan 110 Cfm Ceiling Mounted 450,000.00 450,000.00 Unit 450,000.00 - 450,000.00 450,000.00 450,000.00 L. Bajo
2 Exhaust fan 1000 Cfm Wall Mounted 3,762,000.00 3,762,000.00 Unit 3,762,000.00 - 3,762,000.00 3,762,000.00 3,762,000.00 L. Bajo
3 Exhaust fan 2000 Cfm Wall Mounted 4,068,900.00 4,068,900.00 Unit 4,068,900.00 - 4,068,900.00 4,068,900.00 4,068,900.00 L. Bajo

BAHAN INSTALASI
1 Pipa Refrigerant 1-2 pk + isolasi 93,800.00 93,800.00 M 93,800.00 - 93,800.00 93,800.00 93,800.00 L. Bajo
2 Pipa Refrigerant 3-4 pk + isolasi 134,600.00 134,600.00 M 134,600.00 - 134,600.00 134,600.00 134,600.00 L. Bajo
3 Pangkon out door 137,500.00 137,500.00 Psng 137,500.00 - 137,500.00 137,500.00 137,500.00 L. Bajo
4 Pipa drain PVC 3/4" 7,200.00 7,200.00 m 7,200.00 - 7,200.00 7,200.00 7,200.00 L. Bajo
5 Kabel Power NYM 3 x 2.5 mm2 (1-2 PK) 16,000.00 16,000.00 M 16,000.00 - 16,000.00 16,000.00 16,000.00 L. Bajo
6 Kabel kontrol NYM 2 x 2.5 mm2 (1-2 PK) 13,000.00 13,000.00 M 13,000.00 - 13,000.00 13,000.00 13,000.00 L. Bajo
7 Kabel kontrol NYM 4 x 2.5 mm2 (3-5 PK) 22,200.00 22,200.00 M 22,200.00 - 22,200.00 22,200.00 22,200.00 L. Bajo
8 Kabel Power NYM 4 x 4 mm2 (3-5 PK) 32,000.00 32,000.00 M 32,000.00 - 32,000.00 32,000.00 32,000.00 L. Bajo
9 Kabel NYA 2.5 mm 10,200.00 10,200.00 M 10,200.00 - 10,200.00 10,200.00 10,200.00 L. Bajo
10 Exhaust Air Grille 45X45 cm 159,000.00 159,000.00 Bh 159,000.00 - 159,000.00 159,000.00 159,000.00 L. Bajo
11 Ducting dengan pipa PVC Ø 4' 40,000.00 40,000.00 M 40,000.00 - 40,000.00 40,000.00 40,000.00 L. Bajo
12 Klem Pipa 7,000.00 7,000.00 Bh 7,000.00 - 7,000.00 7,000.00 7,000.00 L. Bajo
13 T dos 5,000.00 5,000.00 Bh 5,000.00 - 5,000.00 5,000.00 5,000.00 L. Bajo

PEKERJAAN SOUND SISTEM


SOUND SYSTEM
1 Power Amplifier 1000 (4X250) Watt 20,000,000.00 20,000,000.00 Unit 20,000,000.00 - 20,000,000.00 20,000,000.00 20,000,000.00 L. Bajo
2 Power Amplifier 240 Watt 4,565,000.00 4,565,000.00 Unit 4,565,000.00 - 4,565,000.00 4,565,000.00 4,565,000.00 L. Bajo
3 Power Amplifier 120 Watt 2,667,000.00 2,667,000.00 Unit 2,667,000.00 - 2,667,000.00 2,667,000.00 2,667,000.00 L. Bajo
4 Power Amplifier 60 Watt 1,500,000.00 1,500,000.00 Unit 1,500,000.00 - 1,500,000.00 1,500,000.00 1,500,000.00 L. Bajo
5 Digital Mixer Pre- Amp(build in equalizer) 25,000,000.00 25,000,000.00 Unit 25,000,000.00 - 25,000,000.00 25,000,000.00 25,000,000.00 L. Bajo
6 Equalizer 30 Channel 1,500,000.00 1,500,000.00 Unit 1,500,000.00 - 1,500,000.00 1,500,000.00 1,500,000.00 L. Bajo
7 Emergency Massage w/Evac Voice 9,083,800.00 9,083,800.00 Unit 9,083,800.00 - 9,083,800.00 9,083,800.00 9,083,800.00 L. Bajo
8 CD/MMC/USB Player with tunner 4,420,900.00 4,420,900.00 Unit 4,420,900.00 - 4,420,900.00 4,420,900.00 4,420,900.00 L. Bajo
9 Dynamic Microphone 669,000.00 669,000.00 Bh 669,000.00 - 669,000.00 669,000.00 669,000.00 L. Bajo
10 Outlet Microphone 165,000.00 165,000.00 Bh 165,000.00 - 165,000.00 165,000.00 165,000.00 L. Bajo
11 Outlet Sound System 78,000.00 78,000.00 Bh 78,000.00 - 78,000.00 78,000.00 78,000.00 L. Bajo
12 Selector Switch 10 Zone 3,960,000.00 3,960,000.00 Bh 3,960,000.00 - 3,960,000.00 3,960,000.00 3,960,000.00 L. Bajo
Sound Terminal Box 10 pairs uk. 20x15x25 cm
13 455,000.00 455,000.00 Bh 455,000.00 - 455,000.00 455,000.00 455,000.00 L. Bajo
+ mtrl
14 Volume Control 6 watt 156,200.00 156,200.00 Bh 156,200.00 - 156,200.00 156,200.00 156,200.00 L. Bajo
15 Ceiling speaker 6 watt 240,900.00 240,900.00 Bh 240,900.00 - 240,900.00 240,900.00 240,900.00 L. Bajo
16 Coloum Speaker 20 watt 728,000.00 728,000.00 Bh 728,000.00 - 728,000.00 728,000.00 728,000.00 L. Bajo
17 Horn Speaker 25 w 599,000.00 599,000.00 Bh 599,000.00 - 599,000.00 599,000.00 599,000.00 L. Bajo
18 Cabinet Rack with Acc 24,500,000.00 24,500,000.00 Bh 24,500,000.00 - 24,500,000.00 24,500,000.00 24,500,000.00 L. Bajo
19 Remote micropone w/keypad zone selector 7,370,550.00 7,370,550.00 Bh 7,370,550.00 - 7,370,550.00 7,370,550.00 7,370,500.00 L. Bajo

BAHAN INSTALASI
1 Kabel, NYMHY 2 X 2,5 mm2 15,400.00 15,400.00 M 15,400.00 - 15,400.00 15,400.00 15,400.00 L. Bajo
2 Pipa Conduit 3,500.00 3,500.00 M 3,500.00 - 3,500.00 3,500.00 3,500.00 L. Bajo
3 Socket Pipa 850.00 850.00 Bh 850.00 - 850.00 850.00 850.00 L. Bajo
4 Tee Doos 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
5 Klem Pipa 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
6 Fhiser 1,500.00 1,500.00 Bh 1,500.00 - 1,500.00 1,500.00 1,500.00 L. Bajo

PEKERJAAN FIRE ALARM & APAR


1 Mater Control Panel 5 Zone 5,564,160.00 5,564,160.00 Unit 5,564,160.00 - 5,564,160.00 5,564,160.00 5,564,100.00 L. Bajo
2 Annunciator Panel 5 Zone 2,632,500.00 2,632,500.00 Unit 2,632,500.00 - 2,632,500.00 2,632,500.00 2,632,500.00 L. Bajo
3 Terminal Box Fire Alarm 12 Pair 325,000.00 325,000.00 Bh 325,000.00 - 325,000.00 325,000.00 325,000.00 L. Bajo
4 Terminal Box Fire Alarm 24 Pair 575,000.00 575,000.00 Bh 575,000.00 - 575,000.00 575,000.00 575,000.00 L. Bajo
5 Rate Of Rise Heat Detector HC-306 295,000.00 295,000.00 Bh 295,000.00 - 295,000.00 295,000.00 295,000.00 L. Bajo
6 Fixed Temperature Heat Detector HC-407 62,000.00 62,000.00 Bh 62,000.00 - 62,000.00 62,000.00 62,000.00 L. Bajo
7 Smoke Detector (Independent) HC-208 521,640.00 521,640.00 Bh 521,640.00 - 521,640.00 521,640.00 521,600.00 L. Bajo
8 Manual Push Button (Break glass) 375,500.00 375,500.00 Bh 375,500.00 - 375,500.00 375,500.00 375,500.00 L. Bajo
9 Alarm Bell 6" 24 VDC 318,021.00 318,021.00 Bh 318,021.00 - 318,021.00 318,021.00 318,000.00 L. Bajo
10 Indicating Lamp HC-300L 165,000.00 165,000.00 Bh 165,000.00 - 165,000.00 165,000.00 165,000.00 L. Bajo
Fire Extinguser's 25 Kg Trolly u/ R. Pompa,
11 12,500,000.00 12,500,000.00 Bh 12,500,000.00 - 12,500,000.00 12,500,000.00 12,500,000.00 L. Bajo
Genset
12 Fire Extinguser's 50 Kg u/ R. Panel 14,000,000.00 14,000,000.00 Bh 14,000,000.00 - 14,000,000.00 14,000,000.00 14,000,000.00 L. Bajo
13 Fire Extinguisher 6 kg 2,800,000.00 2,800,000.00 Bh 2,800,000.00 - 2,800,000.00 2,800,000.00 2,800,000.00 L. Bajo
14 Fire Extinguisher 3 kg 850,000.00 850,000.00 Bh 850,000.00 - 850,000.00 850,000.00 850,000.00 L. Bajo

BAHAN INSTALASI
1 Kabel, NYMHY 2 X 1,5 mm2 9,800.00 9,800.00 M 9,800.00 - 9,800.00 9,800.00 9,800.00 L. Bajo
2 Pipa Conduit 3,500.00 3,500.00 M 3,500.00 - 3,500.00 3,500.00 3,500.00 L. Bajo
3 Socket Pipa 850.00 850.00 Bh 850.00 - 850.00 850.00 850.00 L. Bajo
4 Tee Doos 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
5 Klem Pipa 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
6 Fhiser 1,500.00 1,500.00 Bh 1,500.00 - 1,500.00 1,500.00 1,500.00 L. Bajo

PEKERJAAN PEMASANGAN TELEPHONE


1 PABX 3 Line 8 ext 2,250,000.00 2,250,000.00 Unit 2,250,000.00 - 2,250,000.00 2,250,000.00 2,250,000.00 L. Bajo
2 PABX 6 Line 16 ext 4,150,000.00 4,150,000.00 Unit 4,150,000.00 - 4,150,000.00 4,150,000.00 4,150,000.00 L. Bajo
3 PABX 8 Line 24 ext KX TDA 100 8,300,000.00 8,300,000.00 Unit 8,300,000.00 - 8,300,000.00 8,300,000.00 8,300,000.00 L. Bajo
4 PABX 16 Line 40 ext KX TDA 200 16,600,000.00 16,600,000.00 Unit 16,600,000.00 - 16,600,000.00 16,600,000.00 16,600,000.00 L. Bajo
5 PABX 8 line 64 ext 75,000,000.00 75,000,000.00 Unit 75,000,000.00 - 75,000,000.00 75,000,000.00 75,000,000.00 L. Bajo
6 Terminal Box Telephone 455,000.00 455,000.00 Bh 455,000.00 - 455,000.00 455,000.00 455,000.00 L. Bajo
7 Outlet telephon 66,000.00 66,000.00 Bh 66,000.00 - 66,000.00 66,000.00 66,000.00 L. Bajo
8 Key telephon display 2,000,000.00 2,000,000.00 Bh 2,000,000.00 - 2,000,000.00 2,000,000.00 2,000,000.00 L. Bajo
9 Pesawat Telepon Standart 500,000.00 500,000.00 Bh 500,000.00 - 500,000.00 500,000.00 500,000.00 L. Bajo
MDF+Arester pelindung petir + kabel power +
10 5,500,000.00 5,500,000.00 Unit 5,500,000.00 - 5,500,000.00 5,500,000.00 5,500,000.00 L. Bajo
grounding
11 Batteryfor back up stanby (-/+30 menite) 6,500,000.00 6,500,000.00 Bh 6,500,000.00 - 6,500,000.00 6,500,000.00 6,500,000.00 L. Bajo
12 Kabel ITC 1 (2x0,6) mm2 (1 pair) 2,500.00 2,500.00 M 2,500.00 - 2,500.00 2,500.00 2,500.00 L. Bajo
13 Kabel ITC 10 (2x0,6) mm2 (10 pair) 16,000.00 16,000.00 M 16,000.00 - 16,000.00 16,000.00 16,000.00 L. Bajo
14 Kabel ITC 20 (2x0,6) mm2 (20 pair) 26,000.00 26,000.00 M 26,000.00 - 26,000.00 26,000.00 26,000.00 L. Bajo
15 Kabel ITC 40 (2x0,6) mm2 (40 pair) 53,000.00 53,000.00 M 53,000.00 - 53,000.00 53,000.00 53,000.00 L. Bajo
16 Kabel ITC 50 (2x0,6) mm2 (50 pair) 62,000.00 62,000.00 M 62,000.00 - 62,000.00 62,000.00 62,000.00 L. Bajo
BAHAN INSTALASI
1 Kabel ITC 2x0,6mm2 2,500.00 2,500.00 M 2,500.00 - 2,500.00 2,500.00 2,500.00 L. Bajo
2 Pipa Conduit 3,500.00 3,500.00 M 3,500.00 - 3,500.00 3,500.00 3,500.00 L. Bajo
3 Socket Pipa 850.00 850.00 M 850.00 - 850.00 850.00 850.00 L. Bajo
4 Tee Doos 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
5 Klem Pipa 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
6 Fhiser 1,500.00 1,500.00 Bh 1,500.00 - 1,500.00 1,500.00 1,500.00 L. Bajo

PEKERJAAN KABEL TRAY


1 Kabel Tray Tipe U (200x100 mm) 176,333.00 176,333.00 M 176,333.00 - 176,333.00 176,333.00 176,300.00 L. Bajo
2 Kabel Tray Tipe U (300x100 mm) 220,333.00 220,333.00 M 220,333.00 - 220,333.00 220,333.00 220,300.00 L. Bajo
3 Kabel Ladder Tipe U (200x100 mm) 127,000.00 127,000.00 M 127,000.00 - 127,000.00 127,000.00 127,000.00 L. Bajo
4 Kabel Ladder Tipe U (400x100 mm) 197,667.00 197,667.00 M 197,667.00 - 197,667.00 197,667.00 197,600.00 L. Bajo
5 Besi siku 4.4.4 24,167.00 24,167.00 M 24,167.00 - 24,167.00 24,167.00 24,100.00 L. Bajo
6 Mur Baut + Fisher 1,650.00 1,650.00 Pcs 1,650.00 - 1,650.00 1,650.00 1,600.00 L. Bajo

BAHAN INSTALASI
1 Kabel NYM 3 X 2,5 mm 16,000.00 16,000.00 M 16,000.00 - 16,000.00 16,000.00 16,000.00 L. Bajo
2 Pipa conduit 3,500.00 3,500.00 ljr 3,500.00 - 3,500.00 3,500.00 3,500.00 L. Bajo
3 Socket Pipa 850.00 850.00 bh 850.00 - 850.00 850.00 850.00 L. Bajo
4 Tee Doos 4,400.00 4,400.00 bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
5 Klem Pipa 4,400.00 4,400.00 bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
6 Inbow dos 3,500.00 3,500.00 bh 3,500.00 - 3,500.00 3,500.00 3,500.00 L. Bajo

PEKERJAAN PEMASANGAN MA TV
1 Antena UHV/VHF 358,580.00 358,580.00 Unit 358,580.00 - 358,580.00 358,580.00 358,500.00 L. Bajo
2 Boster 48 db 4,275,500.00 4,275,500.00 Unit 4,275,500.00 - 4,275,500.00 4,275,500.00 4,275,500.00 L. Bajo
3 Spliter 8 way 487,200.00 487,200.00 Unit 487,200.00 - 487,200.00 487,200.00 487,200.00 L. Bajo
4 Outlet TV 85,000.00 85,000.00 Unit 85,000.00 - 85,000.00 85,000.00 85,000.00 L. Bajo
5 Spliter 4 way 260,000.00 260,000.00 Unit 260,000.00 - 260,000.00 260,000.00 260,000.00 L. Bajo
Televisi LED 32 inc + support galvanis
6 2,500,000.00 2,500,000.00 Bh 2,500,000.00 - 2,500,000.00 2,500,000.00 2,500,000.00 L. Bajo
gantungan
BAHAN INSTALASI
1 Kabel, Coaxial 5C-2V 13,000.00 13,000.00 M 13,000.00 - 13,000.00 13,000.00 13,000.00 L. Bajo
2 Pipa Conduit 3,500.00 3,500.00 M 3,500.00 - 3,500.00 3,500.00 3,500.00 L. Bajo
3 Socket Pipa 850.00 850.00 Bh 850.00 - 850.00 850.00 850.00 L. Bajo
4 Tee Doos 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
5 Klem Pipa 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
6 Fhiser 1,500.00 1,500.00 Bh 1,500.00 - 1,500.00 1,500.00 1,500.00 L. Bajo

PEKERJAAN PEMASANGAN CCTV


1 Indoor Fixed Dome Camera 1,350,000.00 1,350,000.00 Unit 1,350,000.00 - 1,350,000.00 1,350,000.00 1,350,000.00 L. Bajo
2 IP Indoor Dome Camera 602,000.00 602,000.00 Unit 602,000.00 - 602,000.00 602,000.00 602,000.00 L. Bajo
3 Indoor Pan / Tilt / Zoom Camera 1,500,000.00 1,500,000.00 Unit 1,500,000.00 - 1,500,000.00 1,500,000.00 1,500,000.00 L. Bajo
4 NVR 16 Channel W/ HDD 4TB 5,283,000.00 5,283,000.00 Unit 5,283,000.00 - 5,283,000.00 5,283,000.00 5,283,000.00 L. Bajo
5 32" LED TV 2,500,000.00 2,500,000.00 Unit 2,500,000.00 - 2,500,000.00 2,500,000.00 2,500,000.00 L. Bajo
6 24 VAC Power Supply 1,342,500.00 1,342,500.00 Unit 1,342,500.00 - 1,342,500.00 1,342,500.00 1,342,500.00 L. Bajo
7 Positioning Device Colroller 6,662,750.00 6,662,750.00 Unit 6,662,750.00 - 6,662,750.00 6,662,750.00 6,662,700.00 L. Bajo

BAHAN INSTALASI
1 Kabel RG - 59 3,500.00 3,500.00 M 3,500.00 - 3,500.00 3,500.00 3,500.00 L. Bajo
2 Kabel STP 18 AWG 10,500.00 10,500.00 M 10,500.00 - 10,500.00 10,500.00 10,500.00 L. Bajo
3 Kabel NYMHY 3 x 2,5 mm2 21,000.00 21,000.00 M 21,000.00 - 21,000.00 21,000.00 21,000.00 L. Bajo
4 Pipa Conduit 3,500.00 3,500.00 M 3,500.00 - 3,500.00 3,500.00 3,500.00 L. Bajo
5 Socket Pipa 850.00 850.00 Bh 850.00 - 850.00 850.00 850.00 L. Bajo
6 Tee Doos 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
7 Klem Pipa 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
8 Fhiser 1,500.00 1,500.00 Bh 1,500.00 - 1,500.00 1,500.00 1,500.00 L. Bajo

PEKERJAAN PEMASANGAN LAN


1 Switch Hub 24 port 800,000.00 800,000.00 Unit 800,000.00 - 800,000.00 800,000.00 800,000.00 L. Bajo
2 Switch Hub 16 port 764,905.00 764,905.00 Unit 764,905.00 - 764,905.00 764,905.00 764,900.00 L. Bajo
3 Switch Hub 8 port 390,500.00 390,500.00 Unit 390,500.00 - 390,500.00 390,500.00 390,500.00 L. Bajo
4 Outlet RJ45 inbow 73,000.00 73,000.00 Bh 73,000.00 - 73,000.00 73,000.00 73,000.00 L. Bajo
BAHAN INSTALASI
1 Kabel UTP CAT 6 E 3,960.00 3,960.00 M 3,960.00 - 3,960.00 3,960.00 3,900.00 L. Bajo
2 Kabel labeling 6,600.00 6,600.00 M 6,600.00 - 6,600.00 6,600.00 6,600.00 L. Bajo
3 Pipa Conduit 3,500.00 3,500.00 M 3,500.00 - 3,500.00 3,500.00 3,500.00 L. Bajo
4 Socket Pipa 850.00 850.00 M 850.00 - 850.00 850.00 850.00 L. Bajo
5 Tee Doos 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
6 Klem Pipa 4,400.00 4,400.00 Bh 4,400.00 - 4,400.00 4,400.00 4,400.00 L. Bajo
7 Fhiser 1,500.00 1,500.00 Bh 1,500.00 - 1,500.00 1,500.00 1,500.00 L. Bajo

PEKERJAAN PEMASANGAN NURSE CALL


1 20 Call Master Master 16,715,500.00 16,715,500.00 Bh 16,715,500.00 - 16,715,500.00 16,715,500.00 16,715,500.00 L. Bajo
2 Power Supply 1,700,500.00 1,700,500.00 Bh 1,700,500.00 - 1,700,500.00 1,700,500.00 1,700,500.00 L. Bajo
3 Call Button u/ Bed 350,900.00 350,900.00 Bh 350,900.00 - 350,900.00 350,900.00 350,900.00 L. Bajo
4 Receptacle For Call Button 335,500.00 335,500.00 Bh 335,500.00 - 335,500.00 335,500.00 335,500.00 L. Bajo
5 Call Speaker Sub Station Ceiling Mounted 1,450,000.00 1,450,000.00 Bh 1,450,000.00 - 1,450,000.00 1,450,000.00 1,450,000.00 L. Bajo
6 Reset Button 246,350.00 246,350.00 Bh 246,350.00 - 246,350.00 246,350.00 246,300.00 L. Bajo
7 Corridor Lamp 315,250.00 315,250.00 Bh 315,250.00 - 315,250.00 315,250.00 315,200.00 L. Bajo
8 Bathroom pullcord u/kamar mandi 925,200.00 925,200.00 Bh 925,200.00 - 925,200.00 925,200.00 925,200.00 L. Bajo
Installasi kabel ITC 2 X 2 X 0,6 mm dalam
9
conduite

PEKERJAAN PEMASANGAN PENANGKAL PETIR


Head Penangkal Petir non radioaktif radius 150
1 5,400,000.00 5,400,000.00 unit 5,400,000.00 - 5,400,000.00 5,400,000.00 5,400,000.00 L. Bajo
m Ex. Kurn
2 Down Conductor NYY 1x70 mm 133,500.00 133,500.00 m 133,500.00 - 133,500.00 133,500.00 133,500.00 L. Bajo
Dudukan Tiang, Tiang Penangkal Petir (5
3 1,000,000.00 1,000,000.00 unit 1,000,000.00 - 1,000,000.00 1,000,000.00 1,000,000.00 L. Bajo
Meter) dan mtrl bantu

4 Grounding Sistem, Bak kontrol, dan Instalasi 1,800,000.00 1,800,000.00 ls 1,800,000.00 - 1,800,000.00 1,800,000.00 1,800,000.00 L. Bajo

5 Klem & material bantu 450,000.00 450,000.00 ls 450,000.00 - 450,000.00 450,000.00 450,000.00 L. Bajo
6 Perijinanan 3,000,000.00 3,000,000.00 ls 3,000,000.00 - 3,000,000.00 3,000,000.00 3,000,000.00 L. Bajo

M Bahan Bakar dan Minyak Pelumas


1 Bahan Bakar Premium ( Non Subsidi ) 7,650.00 7,650.00 Ltr 7,650.00 - 7,650.00 7,650.00 7,650.00 L. Bajo
2 Bahan Bakar Solar ( Non Subsidi ) 13,700.00 13,700.00 Ltr 13,700.00 - 13,700.00 13,700.00 13,700.00 L. Bajo
3 Minyak Pelumas 27,000.00 27,000.00 Ltr 27,000.00 229.41 27,229.41 27,229.41 27,200.00 L. Bajo
4 Minyak Bekisting 7,500.00 7,500.00 Liter 7,500.00 229.41 7,729.41 7,729.41 7,700.00 L. Bajo
HARGA DASAR SATUAN UPAH

Harga Satuan (Rp.)


No. Tenaga Kerja Kode Satuan Keterangan
Jam Hari

1 Pekerja L.01.01 OH Rp. 12,400.00 Rp. 87,200.00


2 Tukang L.02.01 OH Rp. 17,800.00 Rp. 125,100.00
3 Tukang Gali L.02.02 OH Rp. 12,400.00 Rp. 87,200.00
4 Tukang Batu L.02.03 OH Rp. 17,800.00 Rp. 125,100.00
5 Tukang Kayu L.02.04 OH Rp. 17,800.00 Rp. 125,100.00
6 Tukang Besi L.02.05 OH Rp. 17,800.00 Rp. 125,100.00
7 Tukang Cat / Pelitur L.02.06 OH Rp. 17,800.00 Rp. 125,100.00
8 Tukang Pipa / Operator Pompa L.02.07 OH Rp. 17,800.00 Rp. 125,100.00
9 Tukang Pengayam Bronjong L.02.08 OH Rp. 17,800.00 Rp. 125,100.00
10 TUKANG ALUMUNIUM L.02.09 OH Rp. 17,800.00 Rp. 125,100.00
11 Tukang ereksi L.02.10 OH Rp. 17,800.00 Rp. 125,100.00
12 Tukang Las Konstruksi L.02.11 OH Rp. 17,800.00 Rp. 125,100.00
13 Tukang Las L.02.12 OH Rp. 17,800.00 Rp. 125,100.00
14 TUKANG LISTRIK L.02.13 OH Rp. 17,800.00 Rp. 125,100.00
15 TUKANG VIBRATOR L.02.14 OH Rp. 17,800.00 Rp. 125,100.00
16 TUKANG PASANG KERAMIK L.02.15 OH Rp. 17,800.00 Rp. 125,100.00
17 Tukang Tebas L.02.16 OH Rp. 12,400.00 Rp. 87,200.00
18 Kepala Tukang L.03.01 OH Rp. 19,900.00 Rp. 139,800.00
19 Mandor L.04.01 OH Rp. 19,900.00 Rp. 139,800.00
20 PENJAGA MALAM L.05.01 OH Rp. 17,800.00 Rp. 125,100.00
21 Oprator L.06.01 OH Rp. 17,800.00 Rp. 125,100.00
22 Pembantu Oprator L.06.02 OH Rp. 12,400.00 Rp. 87,200.00
23 Operator Alat Elektronik L.07.01 OH Rp. 17,800.00 Rp. 125,100.00

Anda mungkin juga menyukai