JUMLAH HARGA
NO JENIS PEKERJAAN
(Rp)
1 2 3
A PEKERJAAN PERSIAPAN 224,187,996.13
B PEKERJAAN SALURAN PENGELAK 44,414,023.50
C PERKERJAAN KONTRUKSI UTAMA BENDUNG 6,214,527,651.24
D PEKERJAAN PEMBUATAN BANGUNAN PENGURAS 224,567,145.86
E PEKERJAAN TEMBOK PANGKAL,DAN SAYAP KIRI KANAN DIHULU 4,130,522,793.10
F PEKERJAAN TEMBOK PANGKAL DAN SAYAP KIRI KANAN DIHILIR 1,153,442,312.99
G PEKERJAAN PEMBUATAN RIP RAP 182,358,247.41
H PEKERJAAN PEMBUATAN BANGUNAN INTAKE 166,645,120.14
JUMLAH TOTAL 12,340,665,290.37
PPN 10 % 1,234,066,529.04
JUMLAH TOTAL + PPN 10% 13,574,731,819.41
DIBULATKAN 13,574,731,000.00
TERBILANG : Tiga Belas Milyar Lima Ratus Tujuh Puluh Empat Juta Tujuh Ratus Tiga Puluh Satu Ribu Rupiah
RENCANA ANGGARAN BIAYA
PERENCANAAN BENDUNG BATANG BAYANG PESISIR SELATAN
Jumlah 12,340,665,290.37
REKAPITULASI HARGA SATUAN PEKERJAAN
PERENCANAAN BENDUNG BATANG BAYANG PESISIR SELATAN
Harga Satuan
No Uraian Pekerjaan Satuan
(Rp.)
1 2 3 5
A Pekerjaan Persiapan
1 Ulitzetten dan Dokumentasi Ls 5,726,784.25
2 Pekerjaan Pengukuran Ls 7,231,009.72
3 Pekerjaan Pembersihan Lokasi M2 16,824.50
4 Pekerjaan Bowplank M2 56,180.63
5 Pembuatan Direksi Keet M2 905,251.60
6 Papan nama proyek ukuran 0.9 m x 0.8 m M2 201,096.06
D Pekerjaan Pilar
1 Pekerjaan Cyclopen 1:2:3+40% Batu Kali termasuk cetakan untuk 2 pilar M3 927,425.48
I BANGUNAN PELENGKAP
1 Pekerjaan Pintu
a. Pintu Penguras bh 45,650,000.00
b. Pintu Intake bh 20,401,875.00
Jumlah 89,969,146.26
Terbilang:
25000
20000
15000
C
Jumlah Harga
Overhead + Fee 10%
Total Harga Satuan
10000
5000
0
1 2 3 4 5
ANALISA HARGA SATUAN PEKERJAAN
B BAHAN
1 Cetak Photo Ls 1 500,000.00 500,000.00
2 Tinta Printer Ls 1 500,000.00 500,000.00
C ALAT
1 Camera Digital Ls 0.500 1,500,000.00 750,000.00
2 Komputer Ls 0.500 3,000,000.00 1,500,000.00
3 Printer Ls 0.500 3,500,000.00 1,750,000.00
B BAHAN
1 Cetak Gambar (A0) Ls 1 1,000,000.00 1,000,000.00
2 Pembuatan Laporan Ls 1 1,500,000.00 1,500,000.00
3 Tinta Printer Ls 1 500,000.00 500,000.00
C ALAT
1 Theodolite Ls 1.000 150,000.00 150,000.00
2 Waterpass Ls 1.000 120,000.00 120,000.00
3 Komputer Ls 0.500 3,000,000.00 1,500,000.00
4 Printer A0 Ls 0.500 3,500,000.00 1,750,000.00
B BAHAN
C ALAT
B BAHAN
1 Kayu Balok 5/7 M3 0.013 1,962,100.00 25,507.30
2 Paku 2"-3" Kg 0.020 16,700.00 334.00
3 Kayu Papan 3/20 M3 0.007 1,890,000.00 13,230.00
C ALAT
1 Waterpass Ls 0.004 120,000.00 480.00
Jumlah Harga 51,073.30
Overhead + Fee 10% 5,107.33
Total Harga Satuan 56,180.63
Jenis Pekerjaan : 1 m2 Pembuatan Direksi Keet atap abses gelombang, dinding triplek, kaca nako
Asumsi Pekerjaan : m2
B BAHAN
1 Kaso 4/6 M3 0.050 1,250,000.00 62,500.00
2 Dinding triplek 4 mm lbr 0.600 117,800.00 70,680.00
3 Semen zak 0.520 1,300.00 676.00
4 Pasir Pasang M3 0.100 159,500.00 15,950.00
5 Plafon asbes 3 mm lbr 1.000 74,000.00 74,000.00
6 Paku kg 0.750 16,700.00 12,525.00
7 Asbes Gelombang lbr 0.300 73,000.00 21,900.00
8 Paku Asbes bh 0.100 25,000.00 2,500.00
9 Flor lantai 1 : 3 : 5 M2 0.700 20,000.00 14,000.00
10 Pintu teakwood M2 0.060 650,000.00 39,000.00
11 Jendela kaca nako dn 1.000 189,100.00 189,100.00
12 Cat dinding/ plafon M2 1.000 22,800.00 22,800.00
C ALAT
B BAHAN
1 Triplek tebal 12 mm lbr 0.266 170,600.00 45,379.60
2 Paku kg 0.250 16,700.00 4,175.00
3 Cat Kayu m2 0.500 57,500.00 28,750.00
C ALAT
C ALAT
1 Excavator jam 0.0278 500,000.00 13,900.00
Jumlah Harga 91,827.50
Overhead + Fee 10% 9,182.75
Total Harga Satuan 101,010.25
Analisa Harga Satuan Pekerjaan Konstruksi Bangunan dibagian Hulu,Utama dan Hilir
B BAHAN
1 Batu Kali M3 0.480 170,459.00 81,820.32
2 Pasir beton/cor M3 0.312 159,500.00 49,764.00
3 Kerikil M3 0.468 137,000.00 64,116.00
3 Semen PC (50 kg/zak) Kg 194.000 1,300.00 252,200.00
4 Air ltr 200.000 25.00 5,000.00
5 Plastik Alas M2 1.000 67,840.00 67,840.00
C ALAT
1 Molen Unit/hari 0.167 250,000.00 41,750.00
3 Ember bh 0.0100 6,000.00 60.00
Jumlah Harga 746,820.07
Overhead + Fee 10% 74,682.01
Total Harga Satuan 821,502.08
B BAHAN
1 Kayu Papan 3/20 Kelas IV M3 0.014 1,890,000.00 26,460.00
2 Kaso 5/7 cm M3 0.003 1,250,000.00 3,750.00
3 Paku 5-10 mm kg 0.300 16,700.00 5,010.00
4 Minyak Bekisting ltr 0.200 13,800.00 2,760.00
C ALAT
B BAHAN
1 Batu Kali M3 0.480 170,459.00 81,820.32
2 Pasir beton/cor M3 0.312 159,500.00 49,764.00
3 Kerikil M3 0.468 137,000.00 64,116.00
4 Semen PC (50 kg/zak) Kg 194.000 1,300.00 252,200.00
5 Plastik Alas M2 1.000 67,840.00 67,840.00
6 Air ltr 200.000 25.00 5,000.00
7 Bekisting M2 1.000 96,294.00 96,294.00
C ALAT
1 Molen Unit/hari 0.167 250,000.00 41,750.00
3 Ember bh 0.0100 6,000.00 60.00
Jumlah Harga 843,114.07
Overhead + Fee 10% 84,311.41
Total Harga Satuan 927,425.48
B BAHAN
1 Batu koral beton kg 1021.000 104.58 106,776.34
2 Pasir beton/cor kg 681.000 121.76 82,915.65
3 Semen PC (50 kg/zak) kg 413.000 1,300.00 536,900.00
4 Air ltr 215.000 25.00 5,375.00
C ALAT
1 Molen Unit/hari 0.25 250,000.00 62,500.00
2 Vibrator Unit/hari 0.2000 397,565.12 79,513.02
3 Ember bh 0.0100 6,000.00 60.00
Jumlah Harga 1,026,751.66
Overhead + Fee 10% 102,675.17
Total Harga Satuan 1,129,426.82
B BAHAN
1 Besi Beton Ulir Kg 1.050 15,500.00 16,275.00
2 Kawat Beton Kg 0.015 20,000.00 300.00
C ALAT
Jumlah Harga 19,079.95
Overhead + Fee 10% 1,908.00
Total Harga Satuan 20,987.95
B BAHAN
1 Beton K-300 M3 1.000 1,129,426.82 1,129,426.82
2 Besi Ulir kg 100.000 20,987.95 2,098,794.50
C ALAT
Jumlah Harga 3,231,385.15
Overhead + Fee 10% 323,138.51
Total Harga Satuan 3,554,523.66
B BAHAN
1 Batu Kali M3 1.200 170,459.00 204,550.80
C ALAT
B BAHAN
1 Portland Cement (PC) kg 10.224 1,300.00 13,291.20
2 Pasir Pasang M3 0.020 159,500.00 3,190.00
C ALAT
1 Alat Bantu Ls 1.000 2,500.00 2,500.00
B BAHAN
1 Portland Cement (PC) kg 202.000 1,300.00 262,600.00
2 Pasir Pasang M3 0.485 159,500.00 77,357.50
3 Batu Kali M3 1.200 170,459.00 204,550.80
C ALAT
B BAHAN
1 Batu Kali M3 0.480 - -
2 Pasir beton/cor M3 0.312 - -
3 Semen PC (50 kg/zak) Kg 194.000 - -
4 Air ltr 200.000 - -
5 Plastik Alas M2 1.000 - -
C ALAT
1 Molen Unit/hari 0.167 - -
3 Ember bh 0.0100 - -
Jumlah Harga -
Overhead + Fee 10% -
Total Harga Satuan -
2 0
20
3
3
3
40%BatuKlieonCycp +
2
0,361
No Beton K-30/1kg
4 0,39 8
galinth
,9
6
,1
9
6 5 ,6
0
,5
4
,1
3
5,1
A. Pekerjaan Persiapan
2 ,6 5 0,5 0,2 0,5
G alia n tan ah
2,6
,18
4
g alin
1 0,3
t anh
+40%Cyclo penBatuKli
9,04
1
4,5
0,8
2
4,3
P = 200.00
,9
0
,8
0
0 3 4 7 8 1 1 1 152 16 19 20
10,6 2 1,8 50 ,6 1,8 90,6 1 10 ,81 140,63 1,8 17 0 ,91 8 21
1,8 1,8
2
23 2 4
1 2,8 5 3,6 7
2 7
0,326 3, 2 3 ,24
28
31
0,329 0,9 30
V = 200.00 x 200.00 40,000.00
2 ,65
Galin tanh
4,96
4,3
2, 6
e to
B n C ly c
o p
e n+
0 %B
4 a tu K a
li
0 ,5
C yclop en
2
10 ,23
1 ,
8 0 ,
6 1 ,
8 6
,
0 1 ,
8 0 ,
6 8
,
1 0 ,
6
0,8
2
4,3
P as an gan Ba tuK al i
2 Konstruksi di Hulu
a Cyclopen 1:2:3 + 40% Batu Kali M3 Luas = 8.4
Panjang = 53.80
Volume = 8.40 x 53.80 451.92
M3 Panjang = 9.60
Plastik alas Panjang = 53.80
Volume = 9.60 x 53.80 516.48
3 Tubuh Bendung
a Cyclopen 1:2:3 + 40% Batu Kali M3
Bagian 1 Luas = 2.31
P = 53.80
V = 2.31 x 53.80 124.28
4 ,42
3, 02
3,78
12 ,34
P = 53.80
V = 8.73 x 53.80 469.67
D Pekerjaan Pilar
M3 Luas = 8.73
1 Cyclopen 1:2:3 + 40% Batu Kali n = 2
Tinggi = 8.23
V = 8.73 x 8.23 x 2 143.696
M3 Luas = 36.55
Panjang = 59.45 x 2.00 = 118.90
2 Cyclopen 1:2:3 + 40% Batu Kali Pangkal V = 36.55 x 118.90 4,345.80
dan Tembok Sayap Hulu
Luas = 21.27
b Galian Tanah Kanan P = 19.19
V = 21.27 x 19.19 408.171
Total Galian 756.854
M3 Luas = 34.15
2 Cyclopen 1:2:3 + 40% Batu Kali pada Panggal P = 19.19 x 2 = 38.38
dan Tembok Sayap Hulu V = 34.15 x 38.38 1310.677
0,8
3,0 9
1 2, 09
M2 Luas = 6.3
3 Plesteran 1:3 Tebal = 0.015
V = 6.3 x 0.015 x 2 0.189
DAFTAR HARGA SATUAN UPAH
Harga
No Uraian Satuan Satuan Dasar Ket.
(Rp.)
1 2 3 4 5
I UPAH
1 Mandor OH 143,500.00
2 Kepala Tukang OH 143,500.00
3 Tukang Batu OH 124,950.00
4 Tukang Besi OH 124,950.00
5 Tukang Kayu OH 124,950.00
6 Pekerja OH 81,200.00
8 Juru ukur, operator/ mekanik alat berat OH 187,250.00
9 Pembantu Juru ujur & operator/ mekanik alat berat OH 124,950.00
10 Juru Foto OH 124,950.00
13 Juru gambar (draftmen) OH 187,250.00
14 Pembantu juru gambar OH 81,200.00
15 Operator OH 168,000.00
DAFTAR HARGA SATUAN BAHAN
Harga
No Uraian Satuan Satuan Dasar Ket.
(Rp.)
1 2 3 4 5
II BAHAN
1 Batu Kali m3 170,459.00
2 Pasir Pasang m3 159,500.00
4 Pasir Beton m3 159,500.00 121.76 kg
5 Batu Koral Beton m3 137,000.00 104.58 kg
6 Batu belah/Split m3 297,000.00
7 Tanah Timbunan m3 64,266.00
8 Air ltr 25.00
9 Portland Cement (PC 50 kg/ zak) zak 65,000.00 1,300.00 Kg
10 Kayu Kelas IV m3 1,890,600.00
11 Kayu Balok 5/7 Kelas IV M3 1,962,100.00
12 Kayu Papan 3/20 Kelas IV M3 1,890,000.00
13 Kaso 5/7 Kelas IV M3 1,250,000.00
14 Dolken kayu galam (8-10) btg 34,177.00
15 Plywood 9 mm lbr 117,800.00
16 Kawat beton/ Bendrat kg 16,900.00
17 Paku 5-10 cm kg 16,700.00
18 Paku 2-3 cm Kg 16,700.00
19 Paku biasa 4 cm - 7 cm kg 16,700.00
20 Minyak bekisting ltr 13,800.00
21 Cat dinding/ plafon m2 22,800.00
22 Jendela kaca nako dn 189,100.00
23 Pintu teakwood m2 650,000.00
24 Asbes Gelombang lbr 73,000.00
25 Plafon asbes 3 mm lbr 74,000.00
26 Multiplek t = 12-18 mm Lbr 170,600.00
27 Cat Minyak Plafon kg 57,500.00
28 Karung plastik/ bagor bh 5,000.00
29 Pintu Penguras b = 2 m, h = 3,06 m bh 45,650,000.00
30 Pintu intake b = 0.35 m, h = 0.6 m bh 20,401,875.00
31 Flor lantai 1 : 3 : 5 m2 20,000.00
32 Paku asbes kg 25,000.00
33 Karung pasir bh 5,000.00
34 Kayu Kelas IV m3 1,890,600.00
35 Besi Baja kg 15,500.00
36 Kawat beton/ Bendrat kg 20,000.00
38 Baja Profil Kg 17,500.00
39 Plastik alas m2 67,840.00
40 Gebalan Rumput m2 40,000.00
DAFTAR HARGA SATUAN ALAT
Harga
No Uraian Satuan Satuan Dasar Ket.
(Rp.)
1 2 3 4 5
II BAHAN
1 Molen (Concrete Mixer 0,35 m3) Hari 250,000.00
2 Theodolit Hari 150,000.00
3 Waterpass Hari 120,000.00
7 Excavator Jam 500,000.00
8 Ember buah 6,000.00
9 Kotak adukan buah 200,000.00
10 Vibrator Hari 397,565.12
11 Stemper Unit/hari 200,000.00
12 Gunting pemotong baja bh 250,000.00