JUMLAH
NO URAIAN PEKERJAAN
( Rp )
JUMLAH 589,791,798.17
TOTAL (SUDAH TERMASUK PPN 11%) 589,791,798.17
DIBULATKAN 589,791,000.00
LIMA RATUS DELAPAN PULUH SEMBILAN JUTA TUJUH RATUS SEMBILAN PULUH
Terbilang : SATU RIBU RUPIAH
PEKERJAAN : PEMBUATAN SUMUR TANAH / BOR, POMPA AIR DAN PROFIL TANK
HARGA JUMLAH
Pajak
No. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) % (Rp.)
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN
6 Air Dan Daya Listrik Untuk Kerja ( Genset ) Ls 1.00 300,000.00 11.00 333,000.00
4 Pek. Sloof Si Beton 15/30 (163 Kg/M³) M3 7.80 7,669,876.54 11.00 66,405,791.05
5 Pek. Kolom K1 Beton 20/20 (134 Kg/M³) M3 2.91 8,776,007.35 11.00 28,347,381.34
6 Pek. Kolom KP Beton 15/15 (173 Kg/M³) M3 1.36 12,805,561.35 11.00 19,331,275.41
7 Pek. Balok RB1 Beton 15/30 (163 Kg/M³) M3 12.72 8,816,706.70 11.00 124,484,845.22
8 Pek. Balok B1 Beton 15/20 (230 Kg/M³) M3 2.66 10,422,029.51 11.00 30,772,084.34
Page 2
HARGA JUMLAH
Pajak
No. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) % (Rp.)
1 2 3 4 5 6 7
D PEKERJAAN LANTAI, DINDING DAN PLESTERAN
E PEKERJAAN PENGECATAN
1 Pek. Cat Dinding & Kolom Dengan Dulux M² 516.76 66,649.75 11.00 38,230,533.67
2 Pek. Cat Bidang Kayu Dengan Cat Minyak M² 64.95 58,746.60 11.00 4,235,306.75
3 Pek. Cat List Plafon Dengan Cat Minyak M' 21.00 58,746.60 11.00 1,369,383.25
F PEKERJAAN LISTRIK
Page 3
HARGA JUMLAH
Pajak
No. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) % (Rp.)
1 2 3 4 5 6 7
2 Pek. Stop Kontak Bh 16.00 88,415.83 11.00 1,570,265.20
G PEKERJAAN SANITAIR
H PEKERJAAN AKHIR
1 Dokumentasi (Warna Tiap Lembar 2 Foto) Buku 3.00 100,000.00 11.00 333,000.00
Page 4
DAFTAR HARGA BAHAN
Daftar Upah
Daftar Bahan
I PEKERJAAN PONDASI
A.2.3.1.1. Penggalian 1 M3 Tanah Biasa Sedalam 1 Meter
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.750 86,000.00 64,500.00
Mandor L.04 OH 0.025 187,000.00 4,675.00
Jumlah Tenaga Kerja 69,175.00
B BAHAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 86,000.00 25,800.00
Mandor L.04 OH 0.010 187,000.00 1,870.00
Jumlah Tenaga Kerja 27,670.00
B BAHAN
Pasir Urug M3 1.200 353,100.00 423,720.00
Jumlah Harga Bahan 423,720.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.500 86,000.00 43,000.00
Mandor L.04 OH 0.050 187,000.00 9,350.00
Jumlah Tenaga Kerja 52,350.00
B BAHAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.250 86,000.00 21,500.00
Mandor L.04 OH 0.025 187,000.00 4,675.00
Jumlah Tenaga Kerja 26,175.00
B BAHAN
Tanah Urug M3 1.200 290,400.00 348,480.00
Jumlah Harga Bahan 348,480.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.780 86,000.00 67,080.00
Tukang Batu L.02 OH 0.390 107,000.00 41,730.00
Kepala Tukang L.03 OH 0.039 161,000.00 6,279.00
Mandor L.04 OH 0.039 187,000.00 7,293.00
Jumlah Tenaga Kerja 122,382.00
B BAHAN
Batu Belah M3 1.200 535,700.00 642,840.00
Pasir Urug M3 0.432 353,100.00 152,539.20
Jumlah Harga Bahan 795,379.20
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.500 86,000.00 129,000.00
Tukang Batu L.02 OH 0.750 107,000.00 80,250.00
Kepala Tukang L.03 OH 0.075 161,000.00 12,075.00
Mandor L.04 OH 0.075 187,000.00 14,025.00
Jumlah Tenaga Kerja 235,350.00
B BAHAN
Batu Belah M3 1.200 535,700.00 642,840.00
Semen Portland Kg 202.000 1,787.50 361,075.00
Pasir Pasang M3 0.485 353,100.00 171,253.50
Jumlah Harga Bahan 1,175,168.50
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 86,000.00 17,200.00
Tukang Batu L.02 OH 0.200 107,000.00 21,400.00
Kepala Tukang L.03 OH 0.020 161,000.00 3,220.00
Mandor L.04 OH 0.060 187,000.00 11,220.00
Jumlah Tenaga Kerja 53,040.00
B BAHAN
Semen Portland Kg 230.000 1,787.50 411,125.00
Pasir Beton Kg 893 252.21 225,227.36
Kerikil (Maks. 30 mm) Kg 1,027 413.11 424,265.11
Air Ltr 200 1,100.00 220,000.00
Jumlah Harga Bahan 1,280,617.47
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 86,000.00 141,900.00
Tukang Batu L.02 OH 0.275 107,000.00 29,425.00
Kepala Tukang L.03 OH 0.028 161,000.00 4,508.00
Mandor L.04 OH 0.083 187,000.00 15,521.00
Jumlah Tenaga Kerja 191,354.00
B BAHAN
Semen Portland Kg 326.000 1,787.50 582,725.00
Pasir Beton Kg 760 252.21 191,682.86
Kerikil (Maks. 30 mm) Kg 1,029 413.11 425,091.33
Air Ltr 215 1,100.00 236,500.00
Jumlah Harga Bahan 1,435,999.19
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 86,000.00 141,900.00
Tukang Batu L.02 OH 0.275 107,000.00 29,425.00
Kepala Tukang L.03 OH 0.028 161,000.00 4,508.00
Mandor L.04 OH 0.083 187,000.00 15,521.00
Jumlah Tenaga Kerja 191,354.00
B BAHAN
Semen Portland Kg 371.000 1,787.50 663,162.50
Pasir Beton Kg 698 252.21 176,045.57
Kerikil (Maks. 30 mm) Kg 1,047 413.11 432,527.33
Air Ltr 215 1,100.00 236,500.00
Jumlah Harga Bahan 1,508,235.40
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.070 86,000.00 6,020.00
Tukang Batu L.02 OH 0.070 107,000.00 7,490.00
Kepala Tukang L.03 OH 0.007 161,000.00 1,127.00
Mandor L.04 OH 0.004 187,000.00 748.00
Jumlah Tenaga Kerja 15,385.00
B BAHAN
Besi Beton (Polos/Ulir) Kg 10.500 17,820.00 187,110.00
Kawat Beton Kg 0.150 33,000.00 4,950.00
Jumlah Harga Bahan 192,060.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.520 86,000.00 44,720.00
Tukang Batu L.02 OH 0.260 107,000.00 27,820.00
Kepala Tukang L.03 OH 0.026 161,000.00 4,186.00
Mandor L.04 OH 0.026 187,000.00 4,862.00
Jumlah Tenaga Kerja 81,588.00
B BAHAN
Kayu Kelas III M3 0.045 1,800,000.00 81,000.00
Paku 5 cm - 10 cm Kg 0.300 63,900.00 19,170.00
Jumlah Harga Bahan 100,170.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 86,000.00 56,760.00
Tukang Batu L.02 OH 0.330 107,000.00 35,310.00
Kepala Tukang L.03 OH 0.033 161,000.00 5,313.00
Mandor L.04 OH 0.033 187,000.00 6,171.00
Jumlah Tenaga Kerja 103,554.00
B BAHAN
Kayu Kelas III M3 0.040 1,800,000.00 72,000.00
Paku 5 cm - 10 cm Kg 0.400 63,900.00 25,560.00
Balok Kayu Kelas II M3 0.015 3,300,000.00 49,500.00
Plywood Tebal 9 mm Lbr 0.350 221,142.86 77,400.00
Jumlah Harga Bahan 224,460.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 86,000.00 56,760.00
Tukang Batu L.02 OH 0.330 107,000.00 35,310.00
Kepala Tukang L.03 OH 0.033 161,000.00 5,313.00
Mandor L.04 OH 0.033 187,000.00 6,171.00
Jumlah Tenaga Kerja 103,554.00
B BAHAN
Kayu Kelas III M3 0.040 1,800,000.00 72,000.00
Paku 5 cm - 10 cm Kg 0.400 63,900.00 25,560.00
Balok Kayu Kelas II M3 0.018 3,300,000.00 59,400.00
Plywood Tebal 9 mm Lbr 0.350 221,142.86 77,400.00
Jumlah Harga Bahan 234,360.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 86,000.00 56,760.00
Tukang Batu L.02 OH 0.330 107,000.00 35,310.00
Kepala Tukang L.03 OH 0.033 161,000.00 5,313.00
Mandor L.04 OH 0.033 187,000.00 6,171.00
Jumlah Tenaga Kerja 103,554.00
B BAHAN
Kayu Kelas III M3 0.040 1,800,000.00 72,000.00
Paku 5 cm - 10 cm Kg 0.400 63,900.00 25,560.00
Balok Kayu Kelas II M3 0.015 3,300,000.00 49,500.00
Plywood Tebal 9 mm Lbr 0.350 221,142.86 77,400.00
Jumlah Harga Bahan 224,460.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 86,000.00 56,760.00
Tukang Kayu L.02 OH 0.330 107,000.00 35,310.00
Kepala Tukang L.03 OH 0.033 161,000.00 5,313.00
Mandor L.04 OH 0.033 187,000.00 6,171.00
Jumlah Tenaga Kerja 103,554.00
B BAHAN
Kayu Kelas III M3 0.030 1,800,000.00 54,000.00
Paku 5 cm - 10 cm Kg 0.400 63,900.00 25,560.00
Balok Kayu Kelas II M3 0.020 3,300,000.00 66,000.00
Plywood Tebal 9 mm Lbr 0.350 221,142.86 77,400.00
Jumlah Harga Bahan 222,960.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.520 86,000.00 44,720.00
Tukang Kayu L.02 OH 0.260 107,000.00 27,820.00
Kepala Tukang L.03 OH 0.026 161,000.00 4,186.00
Mandor L.04 OH 0.026 187,000.00 4,862.00
Jumlah Tenaga Kerja 81,588.00
B BAHAN
Kayu Kelas III M3 0.040 1,800,000.00 72,000.00
Paku 5 cm - 10 cm Kg 0.300 63,900.00 19,170.00
Minyak Bekisting Liter 0.100 0.00
Jumlah Harga Bahan 91,170.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.660 86,000.00 56,760.00
Tukang Kayu L.02 OH 0.330 107,000.00 35,310.00
Kepala Tukang L.03 OH 0.033 161,000.00 5,313.00
Mandor L.04 OH 0.033 187,000.00 6,171.00
Jumlah Tenaga Kerja 103,554.00
B BAHAN
Kayu Kelas III M3 0.030 1,800,000.00 54,000.00
Paku 5 cm - 10 cm Kg 0.400 63,900.00 25,560.00
Balok Kayu Kelas II M3 0.015 3,300,000.00 49,500.00
Plywood Tebal 9 mm Lbr 0.350 221,142.86 77,400.00
Jumlah Harga Bahan 206,460.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.040 86,000.00 3,440.00
Mandor L.04 OH 0.004 187,000.00 748.00
B Jumlah (A) 4,188.00
C Overhead & Profit 15% 628.20
D Harga Satuan Pekerjaan (B+C) 4,816.20
Pengumpulan Beton
a. 1M3 Beton Pondasi (104 Kg/M3)
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,871,456.17 1,871,456.17
Pembesian Kg 104.00 22,720.17 2,362,897.33
Bekisting M2 0.17 198,671.70 33,774.19
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah Tenaga Kerja 4,272,943.89
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,871,456.17 1,871,456.17
Pembesian Kg 199.00 22,720.17 4,521,313.17
Bekisting Cetakan 1/2 M2 8.33 209,021.70 1,741,150.76
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 8,138,736.30
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,871,456.17 1,871,456.17
Pembesian Kg 182.00 22,720.17 4,135,070.33
Bekisting Cetakan 1/2 M2 8.33 209,021.70 1,741,150.76
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 7,752,493.46
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,871,456.17 1,871,456.17
Pembesian Kg 230.00 22,720.17 5,225,638.33
Bekisting Cetakan 1/2 M2 10.00 209,021.70 2,090,217.00
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 9,192,127.70
d. 1M3 Beton Sloof 15/30 (163 Kg/M3)
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,871,456.17 1,871,456.17
Pembesian Kg 163.00 22,720.17 3,703,387.17
Bekisting Cetakan 1/2 M2 10.00 209,021.70 2,090,217.00
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 7,669,876.54
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,871,456.17 1,871,456.17
Pembesian Kg 221.00 22,720.17 5,021,156.83
Bekisting Cetakan 1/2 M2 8.33 377,216.10 3,142,210.11
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 10,039,639.32
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,871,456.17 1,871,456.17
Pembesian Kg 169.00 22,720.17 3,839,708.17
Bekisting Cetakan 1/2 M2 8.33 377,216.10 3,142,210.11
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 8,858,190.65
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,954,527.82 1,954,527.82
Pembesian Kg 159.00 22,720.17 3,612,506.50
Bekisting Cetakan 1/2 M2 8.33 388,601.10 3,237,047.16
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 8,808,897.68
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,954,527.82 1,954,527.82
Pembesian Kg 230.00 22,720.17 5,225,638.33
Bekisting Cetakan 1/2 M2 8.33 388,601.10 3,237,047.16
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 10,422,029.51
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,871,456.17 1,871,456.17
Pembesian Kg 163.00 22,720.17 3,703,387.17
Bekisting Cetakan 1/2 M2 8.33 388,601.10 3,237,047.16
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 8,816,706.70
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,871,456.17 1,871,456.17
Pembesian Kg 113.00 22,720.17 2,567,378.83
Bekisting Cetakan 1/2 M2 8.33 388,601.10 3,237,047.16
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 7,680,698.37
i. 1M3 Beton Balok 20/45 (131 Kg/M3)
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,954,527.82 1,954,527.82
Pembesian Kg 131.00 22,720.17 2,976,341.83
Bekisting Cetakan 1/2 M2 8.33 388,601.10 3,237,047.16
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 8,172,733.01
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,954,527.82 1,954,527.82
Pembesian Kg 137.00 22,720.17 3,112,662.83
Bekisting Cetakan 1/2 M2 7.27 375,491.10 2,729,820.30
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 7,801,827.15
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,954,527.82 1,954,527.82
Pembesian Kg 100.00 22,720.17 2,272,016.67
Bekisting Cetakan 1/2 M2 8.33 377,216.10 3,142,210.11
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 7,373,570.80
A BAHAN
Mutu Beton ad. 1 : 2 : 3 M3 1.00 1,954,527.82 1,954,527.82
Pembesian Kg 82.00 22,720.17 1,863,053.67
Bekisting Cetakan 1/2 M2 8.33 356,516.10 2,969,779.11
Bongkar Bekisting M2 1.00 4,816.20 4,816.20
Jumlah 6,792,176.80
III PEKERJAAN DINDING DAN PLESTERAN.
1. A.4.4.1.10. Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22)cm tebal 1/2 Batu Campuran 1 SP : 4 PP
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 86,000.00 25,800.00
Tukang Batu L.02 OH 0.100 107,000.00 10,700.00
Kepala Tukang L.03 OH 0.010 161,000.00 1,610.00
Mandor L.04 OH 0.015 187,000.00 2,805.00
Jumlah Tenaga Kerja 40,915.00
B BAHAN
Bata Merah Bh 70.000 4,400.00 308,000.00
Semen Portland Kg 11.500 1,787.50 20,556.25
Pasir Pasang M3 0.043 353,100.00 15,183.30
Jumlah Harga Bahan 343,739.55
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.300 86,000.00 25,800.00
Tukang Batu L.02 OH 0.100 107,000.00 10,700.00
Kepala Tukang L.03 OH 0.010 161,000.00 1,610.00
Mandor L.04 OH 0.150 187,000.00 28,050.00
Jumlah Tenaga Kerja 66,160.00
B BAHAN
Batu Bata Bh 8.33 5,000.00 41,666.67
Semen Portland Kg 11.000 1,787.50 19,662.50
Pasir Pasang M3 0.04 353,100.00 12,358.50
Jumlah Harga Bahan 73,687.67
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 86,000.00 25,800.00
Tukang Batu L.02 OH 0.150 107,000.00 16,050.00
Kepala Tukang L.03 OH 0.015 161,000.00 2,415.00
Mandor L.04 OH 0.015 187,000.00 2,805.00
Jumlah Tenaga Kerja 47,070.00
B BAHAN
Semen Portland Kg 7.776 1,787.50 13,899.60
Pasir Pasang M3 0.023 353,100.00 8,121.30
Jumlah Harga Bahan 22,020.90
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 86,000.00 25,800.00
Tukang Batu L.02 OH 0.150 107,000.00 16,050.00
Kepala Tukang L.03 OH 0.015 161,000.00 2,415.00
Mandor L.04 OH 0.015 187,000.00 2,805.00
Jumlah Tenaga Kerja 47,070.00
B BAHAN
Semen Portland Kg 6.240 1,787.50 11,154.00
Pasir Pasang M3 0.024 353,100.00 8,474.40
Jumlah Harga Bahan 19,628.40
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.400 86,000.00 34,400.00
Tukang Batu L.02 OH 0.200 107,000.00 21,400.00
Kepala Tukang L.03 OH 0.020 161,000.00 3,220.00
Mandor L.04 OH 0.002 187,000.00 374.00
Jumlah Tenaga Kerja 59,394.00
B BAHAN
Semen Portland Kg 8.320 1,787.50 14,872.00
Pasir Pasang M3 0.032 353,100.00 11,299.20
Jumlah Harga Bahan 85,565.20
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.200 86,000.00 17,200.00
Tukang Batu L.02 OH 0.100 107,000.00 10,700.00
Kepala Tukang L.03 OH 0.010 161,000.00 1,610.00
Mandor L.04 OH 0.010 187,000.00 1,870.00
Jumlah Tenaga Kerja 31,380.00
B BAHAN
Semen PC Kg 3.250 1,787.50 5,809.38
Jumlah Harga Bahan 5,809.38
C PERALATAN
A TENAGA
Pekerja L.01 OH 7.000 86,000.00 602,000.00
Tukang Kayu L.02 OH 21.000 107,000.00 2,247,000.00
Kepala Tukang L.03 OH 2.100 161,000.00 338,100.00
Mandor L.04 OH 0.350 187,000.00 65,450.00
Jumlah Tenaga Kerja 3,252,550.00
B BAHAN
Balok Kayu Kls I M3 1.100 4,400,000.00 4,840,000.00
Paku 10 cm Kg 1.250 63,900.00 79,875.00
Lem Kayu Kg 1.000 160,000.00 160,000.00
Jumlah Harga Bahan 5,079,875.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.000 86,000.00 86,000.00
Tukang Kayu L.02 OH 3.000 107,000.00 321,000.00
Kepala Tukang L.03 OH 0.300 161,000.00 48,300.00
Mandor L.04 OH 0.050 187,000.00 9,350.00
Jumlah Tenaga Kerja 464,650.00
B BAHAN
Papan Kayu Kls I M3 0.040 4,400,000.00 176,000.00
Lem Kayu Kg 0.500 160,000.00
Jumlah Harga Bahan 176,000.00
C PERALATAN
A.4.6.1.6. Pembuatan dan Pemasangan 1 M2 Pintu dan Jendela Kaca, Kayu Kls II
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.800 86,000.00 68,800.00
Tukang Kayu L.02 OH 2.400 107,000.00 256,800.00
Kepala Tukang L.03 OH 0.240 161,000.00 38,640.00
Mandor L.04 OH 0.040 187,000.00 7,480.00
Jumlah Tenaga Kerja 371,720.00
B BAHAN
Papan Kayu Kls II M3 0.024 4,400,000.00 105,600.00
Lem Kayu Kg 0.300 160,000.00 48,000.00
Jumlah Harga Bahan 153,600.00
C PERALATAN
V PEKERJAAN ATAP.
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.000 86,000.00 344,000.00
Tukang Batu L.02 OH 12.000 107,000.00 1,284,000.00
Kepala Tukang L.03 OH 1.200 161,000.00 193,200.00
Mandor L.04 OH 0.200 187,000.00 37,400.00
Jumlah Tenaga Kerja 1,858,600.00
B BAHAN
Balok Kayu Kls I M3 1.100 4,400,000.00 4,840,000.00
Besi Strip Tebal 5 mm Kg 15.000
Paku 12 cm Kg 5.600 63,900.00 357,840.00
Jumlah Harga Bahan 5,197,840.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.700 86,000.00 576,200.00
Tukang Batu L.02 OH 20.100 107,000.00 2,150,700.00
Kepala Tukang L.03 OH 2.010 161,000.00 323,610.00
Mandor L.04 OH 0.335 187,000.00 62,645.00
Jumlah Tenaga Kerja 3,113,155.00
B BAHAN
Balok Kayu M3 1.100 3,300,000.00 3,630,000.00
Besi Strip Tebal 5 mm Kg 15.000
Paku 12 cm Kg 3.000 63,900.00 191,700.00
Jumlah Harga Bahan 3,821,700.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.120 86,000.00 10,320.00
Tukang Batu L.02 OH 0.060 107,000.00 6,420.00
Kepala Tukang L.03 OH 0.006 161,000.00 966.00
Mandor L.04 OH 0.006 187,000.00 1,122.00
Jumlah Tenaga Kerja 18,828.00
B BAHAN
Seng Gelombang BJLS 0.25 Lbr 0.70 156,650.00 109,655.00
Paku Biasa 1/2" - 1" Kg 0.02 60,000.00 1,200.00
Jumlah Harga Bahan 110,855.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.150 86,000.00 12,900.00
Tukang Batu L.02 OH 0.070 107,000.00 7,490.00
Kepala Tukang L.03 OH 0.007 161,000.00 1,127.00
Mandor L.04 OH 0.006 187,000.00 1,122.00
Jumlah Tenaga Kerja 22,639.00
B BAHAN
Seng Plat 3" x 6" BJLS 0.2 Lbr 0.30 89,550.00 26,865.00
Paku Biasa 1/2" - 1" Kg 0.04 60,000.00 2,400.00
Jumlah Harga Bahan 29,265.00
C PERALATAN
A.4.6.1.21. Pemasangan 1 M' Lisplank ukuran (3 x 20) cm, Kayu Kelas I atau Kelas II
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 86,000.00 8,600.00
Tukang Batu L.02 OH 0.200 107,000.00 21,400.00
Kepala Tukang L.03 OH 0.020 161,000.00 3,220.00
Mandor L.04 OH 0.005 187,000.00 935.00
Jumlah Tenaga Kerja 34,155.00
B BAHAN
Papan Kayu M3 0.0108 4,400,000.00 47,520.00
Paku Biasa 1/2" - 1" Kg 0.100 63,900.00 6,390.00
Jumlah Harga Bahan 53,910.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.060 86,000.00 5,160.00
Tukang Batu L.02 OH 0.060 107,000.00 6,420.00
Kepala Tukang L.03 OH 0.006 161,000.00 966.00
Mandor L.04 OH 0.003 187,000.00 561.00
Jumlah Tenaga Kerja 13,107.00
B BAHAN
Lisplank Kasiplank M' 1.0500 65,100.00 68,355.00
Skrup Kg 0.150 1,000.00 150.00
Jumlah Harga Bahan 68,505.00
C PERALATAN
VI PEKERJAAN PLAFOND
A.4.6.1.19. Pemasangan 1 M' Rangka Langit-langit (50 x 100) cm, Kayu Kelas II atau Kelas III
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.150 86,000.00 12,900.00
Tukang Batu L.02 OH 0.300 107,000.00 32,100.00
Kepala Tukang L.03 OH 0.030 161,000.00 4,830.00
Mandor L.04 OH 0.075 187,000.00 14,025.00
Jumlah Tenaga Kerja 63,855.00
B BAHAN
Kaso - kaso 5 x 7 cm M3 0.0154 3,300,000.00 50,820.00
Paku 7 cm - 10 cm Kg 0.200 63,900.00 12,780.00
Jumlah Harga Bahan 63,600.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.350 86,000.00 30,100.00
Tukang Besi L.02 OH 0.350 107,000.00 37,450.00
Kepala Tukang L.03 OH 0.035 161,000.00 5,635.00
Mandor L.04 OH 0.018 187,000.00 3,366.00
Jumlah Tenaga Kerja 76,551.00
B BAHAN
Rangka metal hololw 4 x 4 x 0.3 M' 4.0000 80,100.00 320,400.00
Asesoris Ls 100.00% 80,100.00 80,100.00
Jumlah Harga Bahan 400,500.00
C PERALATAN
A.4.5.1.5. Pemasangan 1 M2 Langit-langit Tripleks Ukuran (120 x 240) cm, Tebal 3 mm, 4 mm & 6 mm
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.100 86,000.00 8,600.00
Tukang Batu L.02 OH 0.100 107,000.00 10,700.00
Kepala Tukang L.03 OH 0.010 161,000.00 1,610.00
Mandor L.04 OH 0.005 187,000.00 935.00
Jumlah Tenaga Kerja 21,845.00
B BAHAN
Tripleks 4 mm Lbr 0.375 221,142.86 82,928.57
Paku Tripleks Kg 0.030 67,400.00 2,022.00
Jumlah Harga Bahan 84,950.57
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.050 107,000.00 5,350.00
Tukang Batu L.02 OH 0.050 161,000.00 8,050.00
Kepala Tukang L.03 OH 0.005 187,000.00 935.00
Mandor L.04 OH 0.003 0.00 0.00
Jumlah Tenaga Kerja 14,335.00
B BAHAN
List Sunda Plafond M 1.050 35,100.00 36,855.00
Skrup Kg 0.010 45,000.00 450.00
Jumlah Harga Bahan 37,305.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.050 86,000.00 4,300.00
Tukang Batu L.02 OH 0.050 107,000.00 5,350.00
Kepala Tukang L.03 OH 0.005 161,000.00 805.00
Mandor L.04 OH 0.003 187,000.00 561.00
Jumlah Tenaga Kerja 11,016.00
B BAHAN
List Kayu Profil M 1.050 43,100.00 45,255.00
Paku Kg 0.010 67,400.00 674.00
Jumlah Harga Bahan 45,929.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.030 86,000.00 2,580.00
Tukang Kayu L.02 OH 0.070 107,000.00 7,490.00
Kepala Tukang L.03 OH 0.007 161,000.00 1,127.00
Mandor L.04 OH 0.004 187,000.00 748.00
Jumlah Tenaga Kerja 11,945.00
B BAHAN
Plywood tbl. 9 mm m2 1.10 221,142.86 243,257.14
Paku Sekrup Kg 0.010 45,000.00 450.00
Jumlah Harga Bahan 243,707.14
C PERALATAN
PEMASANGAN 1 M2 RANGKA BESI HOLLOW 1x40.40.2 MM, MODUL 60 x 120 CM, DINDING PARTISI
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.250 86,000.00 21,500.00
Tukang Besi L.02 OH 0.250 107,000.00 26,750.00
Kepala Tukang L.03 OH 0.025 161,000.00 4,025.00
Mandor L.04 OH 0.013 187,000.00 2,431.00
Jumlah Tenaga Kerja 54,706.00
B BAHAN
Rangka metal hollow 40.40.2 mm m' 3.50 80,100.00 280,350.00
Assesoris (perkuatan, las dll) Ls 1.000 5,000.00 5,000.00
Jumlah Harga Bahan 285,350.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.020 86,000.00 1,720.00
Tukang Batu L.02 OH 0.063 107,000.00 6,741.00
Kepala Tukang L.03 OH 0.0063 161,000.00 1,014.30
Mandor L.04 OH 0.003 187,000.00 561.00
Jumlah Tenaga Kerja 10,036.30
B BAHAN
Plamuur Kg 0.10 47,300.00 4,730.00
Cat Dasar Kg 0.10 62,700.00 6,270.00
Cat Penutup Kg 0.260 142,000.00 36,920.00
Jumlah Harga Bahan 47,920.00
C PERALATAN
A.4.7.1.4. Pengecatan 1 M2 Bidang Kayu Baru ( 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.070 86,000.00 6,020.00
Tukang Cat L.02 OH 0.009 107,000.00 963.00
Kepala Tukang L.03 OH 0.006 161,000.00 966.00
Mandor L.04 OH 0.003 187,000.00 561.00
Jumlah Tenaga Kerja 8,510.00
B BAHAN
Cat Menie Kg 0.20 5,000.00 1,000.00
Plamuur Kg 0.15 62,700.00 9,405.00
Cat Dasar Kg 0.17 62,700.00 10,659.00
Cat Penutup Kg 0.26 21,000.00 5,460.00
Kuas Bh 0.03 5,000.00 150.00
Pengencer Kg 0.03 70,000.00 2,100.00
Ampelas Lbr 0.2 69,000.00 13,800.00
Jumlah Harga Bahan 42,574.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.020 86,000.00 1,720.00
Tukang Cat L.02 OH 0.200 107,000.00 21,400.00
Kepala Tukang L.03 OH 0.0020 161,000.00 322.00
Mandor L.04 OH 0.0025 187,000.00 467.50
Jumlah Tenaga Kerja 23,909.50
B BAHAN
Meni Besi Kg 0.10 0.00 0.00
Kuas Bh 0.01 5,000.00 50.00
Jumlah Harga Bahan 50.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.060 86,000.00 5,160.00
Tukang Cat L.02 OH 0.060 107,000.00 6,420.00
Kepala Tukang L.03 OH 0.0120 161,000.00 1,932.00
Mandor L.04 OH 0.0030 187,000.00 561.00
Jumlah Tenaga Kerja 14,073.00
B BAHAN
Cat Glotex Kg 0.30 21,000.00 6,300.00
Pengencer L 0.01 62,700.00
Kuas Bh 0.01 5,000.00 50.00
Jumlah Harga Bahan 6,350.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.00 86,000.00 86,000.00
Tukang Batu L.02 OH 1.10 107,000.00 117,700.00
Kepala Tukang L.03 OH 0.01 161,000.00 1,610.00
Mandor L.04 OH 0.16 187,000.00 29,920.00
Jumlah Tenaga Kerja 235,230.00
B BAHAN
Closet jongkok Unit 1.00 0.00 0.00
Semen portland Kg 6.00 40.00 240.00
Pasir pasang M3 0.01 55,000.00 550.00
Jumlah Harga Bahan 790.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.01 86,000.00 860.00
Mandor L.04 OH 0.005 187,000.00 935.00
Jumlah Tenaga Kerja 1,795.00
B BAHAN
Kran Air M 1.00 48,000.00 48,000.00
Sealtape Bh 0.025 7,500.00 187.50
Jumlah Harga Bahan 48,187.50
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.00 86,000.00 516,000.00
Tukang Batu L.02 OH 3.00 107,000.00 321,000.00
Kepala Tukang L.03 OH 0.30 161,000.00 48,300.00
Mandor L.04 OH 0.03 187,000.00 5,610.00
Jumlah Tenaga Kerja 890,910.00
B BAHAN
Bata Merah M3 150.00 4,400.00 660,000.00
Semen Portland Kg 120.00 1,787.50 214,500.00
Pasir Pasang M3 0.30 353,100.00 105,930.00
Semen Warna Kg 6.00 21,000.00 126,000.00
Jumlah Harga Bahan 1,106,430.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.036 86,000.00 3,096.00
Mandor L.04 OH 0.002 187,000.00 374.00
Jumlah Tenaga Kerja 3,470.00
B BAHAN
Pipa PVC 1/2" M' 1.20 33,000.00 39,600.00
Perlengkapan % 35.00 39,600.00 13,860.00
Jumlah Harga Bahan 53,460.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Tukang Listrik OH 0.6000 107,000.00 64,200.00
Mandor OH 0.0180 187,000.00 3,366.00
Jumlah Tenaga Kerja 67,566.00
B BAHAN
Kabel NYY 2.5 mm x 3 M' 24.0000 34,700.00 832,800.00
Pipa PVC 3/8" Btng 3.0000 46,200.00 138,600.00
Tdooz Bh 3.0000 10,500.00 31,500.00
Isolasi Bh 0.2000 15,000.00 3,000.00
Las Dop Bh 1.0000 8,500.00 8,500.00
Veting Panasonic Bh 1.0000 85,000.00 85,000.00
Jumlah Harga Bahan 1,099,400.00
C PERALATAN
B Bahan 124,000.00
Lampu Downlight Inbow LED 15 Watt Bh 1.000 124,000.00 124,000.00
C Peralatan -
D Jumlah (A + B + C) 162,600.00
E Overhead & Profit 15.00% x D 24,390.00
F Harga Satuan Pekerjaan (D + E) 186,990.00
B Bahan 143,000.00
Lampu Downlight Outbow LED 15 Watt Bh 1.000 143,000.00 143,000.00
C Peralatan -
D Jumlah (A + B + C) 181,600.00
E Overhead & Profit 15.00% x D 27,240.00
F Harga Satuan Pekerjaan (D + E) 208,840.00
B Bahan 114,000.00
Lampu Downlight Inbow LED 13 Watt Bh 1.000 114,000.00 114,000.00
C Peralatan -
D Jumlah (A + B + C) 152,600.00
E Overhead & Profit 15.00% x D 22,890.00
F Harga Satuan Pekerjaan (D + E) 175,490.00
Pemasangan 1 Buah
Lampu LED Sorot Downlight 5 Watt
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Tenaga 38,600.00
Pekerja L.01 OH 0.200 86,000.00 17,200.00
Tukang Listrik L.02 OH 0.200 107,000.00 21,400.00
Kepala Tukang Listrik L.03 OH - - -
Mandor L.04 OH - - -
B Bahan 120,000.00
C Peralatan -
D Jumlah (A + B + C) 158,600.00
E Overhead & Profit 15.00% x D 23,790.00
F Harga Satuan Pekerjaan (D + E) 182,390.00
Pemasangan 1 Buah
Lampu Sorot Spotlight Outdoor Led 10 Watt
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Tenaga 38,600.00
Pekerja L.01 OH 0.200 86,000.00 17,200.00
Tukang Listrik L.02 OH 0.200 107,000.00 21,400.00
Kepala Tukang Listrik L.03 OH - - -
Mandor L.04 OH - - -
B Bahan 135,000.00
Lampu Sorot Spotlight Outdoor Led
Bh 1.000 135,000.00 135,000.00
10 Watt
C Peralatan -
D Jumlah (A + B + C) 173,600.00
E Overhead & Profit 15.00% x D 26,040.00
F Harga Satuan Pekerjaan (D + E) 199,640.00
Pemasangan 1 meter
Lampu LED Strip RGB
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Tenaga 38,600.00
Pekerja L.01 OH 0.200 86,000.00 17,200.00
Tukang Listrik L.02 OH 0.200 107,000.00 21,400.00
Kepala Tukang Listrik L.03 OH - - -
Mandor L.04 OH - - -
B Bahan 150,000.00
Lampu LED Strip RGB M' 1.000 150,000.00 150,000.00
C Peralatan -
D Jumlah (A + B + C) 188,600.00
E Overhead & Profit 15.00% x D 28,290.00
F Harga Satuan Pekerjaan (D + E) 216,890.00
1 BUAH PEMASANGAN SAKLAR TUNGGAL PANASONIC
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Tenaga 25,733.33
Pekerja L.01 OH 0.133 86,000.00 11,466.67
Tukang Listrik L.02 OH 0.133 107,000.00 14,266.67
Kepala Tukang Listrik L.03 OH - - -
Mandor L.04 OH - - -
B Bahan 51,150.00
Armatur Saklar Tunggal Panasonic Bh 1.000 40,500.00 40,500.00
Inbouw Dust Bh 1.000 10,500.00 10,500.00
Isolasi Bh 0.010 15,000.00 150.00
C Peralatan -
D Jumlah (A + B + C) 76,883.33
E Overhead & Profit 15.00% x D 11,532.50
F Harga Satuan Pekerjaan (D + E) 88,415.83
B Bahan 61,850.00
Armatur Saklar Ganda Panasonic Bh 1.000 51,200.00 51,200.00
Inbouw Dust Bh 1.000 10,500.00 10,500.00
Isolasi Bh 0.010 15,000.00 150.00
C Peralatan -
D Jumlah (A + B + C) 87,583.33
E Overhead & Profit 15.00% x D 13,137.50
F Harga Satuan Pekerjaan (D + E) 100,720.83
B Bahan 51,150.00
Armatur Stop Kontak Panasonic Bh 1.000 40,500.00 40,500.00
Inbouw Dust Bh 1.000 10,500.00 10,500.00
Isolasi Bh 0.010 15,000.00 150.00
C Peralatan -
D Jumlah (A + B + C) 76,883.33
E Overhead & Profit 15.00% x D 11,532.50
F Harga Satuan Pekerjaan (D + E) 88,415.83
IX PEKERJAAN KUNCI DAN KACA.
A.4.6.2.17. Pemasangan 1 M2 Kaca Tebal 5 mm
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.015 86,000.00 1,290.00
Tukang Batu L.02 OH 0.15 107,000.00 16,050.00
Kepala Tukang L.03 OH 0.015 161,000.00 2,415.00
Mandor L.04 OH 0.0008 187,000.00 149.60
Jumlah Tenaga Kerja 19,904.60
B BAHAN
Kaca Tebal 5 mm M2 1.10 332,857.14 366,142.86
Sealant Kg 0.05 35,000.00 1,750.00
Jumlah Harga Bahan 367,892.86
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.017 86,000.00 1,462.00
Tukang Batu L.02 OH 0.17 107,000.00 18,190.00
Kepala Tukang L.03 OH 0.017 161,000.00 2,737.00
Mandor L.04 OH 0.0009 187,000.00 168.30
Jumlah Tenaga Kerja 22,557.30
B BAHAN
Kaca Tebal 10 mm M2 1.10 625,857.14 688,442.86
Sealant Kg 0.07 35,000.00 2,450.00
Jumlah Harga Bahan 690,892.86
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.010 86,000.00 860.00
Tukang Kayu L.02 OH 0.50 107,000.00 53,500.00
Kepala Tukang L.03 OH 0.050 161,000.00 8,050.00
Mandor L.04 OH 0.0050 187,000.00 935.00
Jumlah Tenaga Kerja 63,345.00
B BAHAN
Kunci Union Elite Bh 1.00 282,400.00 282,400.00
Jumlah Harga Bahan 282,400.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.005 86,000.00 430.00
Tukang Kayu L.02 OH 0.50 107,000.00 53,500.00
Kepala Tukang L.03 OH 0.050 161,000.00 8,050.00
Mandor L.04 OH 0.0030 187,000.00 561.00
Jumlah Tenaga Kerja 62,541.00
B BAHAN
Kunci Keyless Stainless Steel Bh 1.00 150,000.00 150,000.00
Jumlah Harga Bahan 150,000.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.010 86,000.00 860.00
Tukang Kayu L.02 OH 0.50 107,000.00 53,500.00
Kepala Tukang L.03 OH 0.050 161,000.00 8,050.00
Mandor L.04 OH 0.0050 187,000.00 935.00
Jumlah Tenaga Kerja 63,345.00
B BAHAN
Pull Handle 60 cm Stainless Steel Bh 1.00 270,000.00 270,000.00
Jumlah Harga Bahan 270,000.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.015 86,000.00 1,290.00
Tukang Kayu L.02 OH 0.15 107,000.00 16,050.00
Kepala Tukang L.03 OH 0.015 161,000.00 2,415.00
Mandor L.04 OH 0.0008 187,000.00 149.60
Jumlah Tenaga Kerja 19,904.60
B BAHAN
Engsel pintu Bh 1.00 43,000.00 43,000.00
Jumlah Harga Bahan 43,000.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.010 86,000.00 860.00
Tukang Kayu L.02 OH 0.10 107,000.00 10,700.00
Kepala Tukang L.03 OH 0.010 161,000.00 1,610.00
Mandor L.04 OH 0.0005 187,000.00 93.50
Jumlah Tenaga Kerja 13,263.50
B BAHAN
Engsel pintu Bh 1.00 43,000.00 43,000.00
Jumlah Harga Bahan 43,000.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.015 86,000.00 1,290.00
Tukang Kayu L.02 OH 0.15 107,000.00 16,050.00
Kepala Tukang L.03 OH 0.015 161,000.00 2,415.00
Mandor L.04 OH 0.0080 187,000.00 1,496.00
Jumlah Tenaga Kerja 21,251.00
B BAHAN
Engsel pintu Bh 1.00 43,000.00 43,000.00
Jumlah Harga Bahan 43,000.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.015 86,000.00 1,290.00
Tukang Kayu L.02 OH 0.15 107,000.00 16,050.00
Kepala Tukang L.03 OH 0.015 161,000.00 2,415.00
Mandor L.04 OH 0.0008 187,000.00 140.25
Jumlah Tenaga Kerja 19,895.25
B BAHAN
Engsel pintu Bh 1.00 43,000.00 43,000.00
Jumlah Harga Bahan 43,000.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.010 86,000.00 860.00
Mandor L.04 OH 0.050 187,000.00 9,350.00
Jumlah Tenaga Kerja 10,210.00
B BAHAN
Floor Drain Bh 1.00 37,000.00 37,000.00
Jumlah Harga Bahan 37,000.00
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.010 86,000.00 860.00
Mandor L.04 OH 0.005 187,000.00 935.00
Jumlah Tenaga Kerja 1,795.00
B BAHAN
Krain 3/4'' Bh 1.00 48,000.00 48,000.00
Sealtape Bh 0.025 7,500.00 187.50
Jumlah Harga Bahan 48,187.50
C PERALATAN
No Uraian Kode Satuan Koofisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.000 86,000.00 86,000.00
Tukang Kayu L.02 OH 2.000 107,000.00 214,000.00
Kepala Tukang L.03 OH 0.200 161,000.00 32,200.00
Mandor L.04 OH 0.050 187,000.00 9,350.00
Jumlah Tenaga Kerja 341,550.00
B BAHAN
Dolken Kayu Diameter 8-10/400 m Batang 1.70 79,300.00 134,810.00
Kayu Klas II M3 0.21 3,300,000.00 693,000.00
Paku Kg 0.30 63,900.00 19,170.00
Semen Portland Kg 10.50 1,787.50 18,768.75
Pasir Beton M3 0.03 353,100.00 10,593.00
Koral Beton M3 0.05 535,700.00 26,785.00
Seng Gelombang Lbr 1.50 156,650.00 234,975.00
Seng Plat Lbr 0.250 132,750.00 33,187.50
Jumlah Harga Bahan 1,171,289.25
C PERALATAN
A PEKERJAAN PERSIAPAN
Pek. Pembersihan Lokasi 1.00
Pek. Pengukuran Dan Pemasangan Bouplank 1.00
Gudang 3.00 2.00 6.00
Papan Nama Proyek 1.00
Pek. Pembongkaran Dinding Exsisting -
Pek. Pembongkaran Lantai Exsisting -
Pek. Pembongkaran Plafond Exsisting -
Pek. Pembongkaran Atap Exsisting -
Kesehatan Dan Keselamatan Kerja ( K3 ) 1.00
Pek. Urugan Pasir Bawah Pondasi t. 5 cm 32.70 0.60 0.05 1.00 0.98 Pondasi menerus Type 1
60.52 0.20 0.05 1.00 0.61 Pondasi Rabat keliling
3.20 0.20 0.05 1.00 0.03 Pondasi trap depan
0.50 0.50 0.05 16.00 0.20 Pondasi setempat
Total 1.82
Pek. Urugan Pasir Bawah Lantai t. 5 cm 12.00 14.00 0.05 8.40 Bawah lantai
Pek. Timbunan Pondasi 14.00 1.50 0.50 10.50 Dalam Bangunan
Pek Pas Batu Kosong Bawah Pondasi 32.70 0.60 0.10 1.00 1.96 Pondasi menerus Type 1
- 6.00 0.10 - Halaman depan
14.20 3.00 0.10 2.00 8.52 halaman samping
22.20 3.00 0.10 6.66 Halaman belakng
Total 17.14
Rabat beton bawah lantai ad. 1:3:5 t. 7 cm 13.85 11.80 0.10 16.34 Halaman depan
Rabat beton keliling ad. 1:3:5 t. 7 cm 14.20 1.00 0.10 2.00 2.84 halaman samping
Pek. Pondasi Telapak (45 Kg/m3) 0.50 0.50 0.15 16.00 0.60 Pondasi setempat pr1
Total 0.60
Pek. Kolom K1-P1 Beton 25/25 (158 Kg/M³) 0.20 0.20 3.45 16.00 2.21 Kolom K1
0.20 0.20 1.10 16.00 0.70 Kolom K2 pedestal
Total 2.91
Pek. Kolom KP Beton 15/15 (221 Kg/M³) 0.15 0.15 3.55 17.00 1.36 Kolom praktis
Total 1.36
Pek. Sloof S1 Beton 15/30 (199 Kg/M³) 94.30 0.2 0.20 1.00 3.77
Pek. Sloof S2 Beton 15/20 (163 Kg/M³) 25.20 0.2 0.20 4.00 4.03
Pek. Balok RB3 Beton 15/30 (139 Kg/M³) 282.60 0.15 0.30 1.00 12.72
Pek. Balok RB4 Beton 15/20 (143 Kg/M³) 88.80 0.15 0.20 1.00 2.66
Pek. Balok BL Beton 15/15 (159 Kg/M³) 45.82 0.15 0.15 1.00 1.03
Plat Talang t. 10 cm (100 Kg/M³) 60.52 1.00 0.10 1.00 6.05 Kanopi 1 Elv. 3.05
60.52 0.70 0.08 1.00 3.39 Lisplank beton teras
Total 9.44
Pek. Plesteran Dinding ad. 1:4 53.55 2.00 107.10 bangunan utama
Total 107.10
Pek. Acian Dinding Baru 107.10
Pek. Plesteran Batako Saluran Keliling ad. 1:4 60.52 - -
Pek. Pemasangan Alumunium Composite Panel (ACP) + Rangka Hollow 60.52 - 1.00 - bagian pintu depan
Total -
Pek Pemasangan Lantai Granit 60/60 (Cream) 14.00 12.00 - - - teras
Total -
Pek Pemasangan Lantai Keramik 60/60 (Anti Selip) 3.20 0.90 - - entrance
Pek Pemasangan Lantai Keramik 30/30 (anti slip) 2.00 2.00 2.00 - - wc
2.00 1.50 - - wc
Total -
Pek Pemasangan Dinding Batu Alam 6.64 1.20 1.00 - -
Total -
G PEKERJAAN PENGECATAN
Pek. Acian Dinding 699.50
Pek. Cat Dinding & Kolom Dengan Metrolite 699.50
H PEKERJAAN LISTRIK
Pek. Pas. Titik Lampu 36.00
Lampu Philips 18 Watt 36.00
Pek. Saklar Tunggal Panasonik 12.00
I PEKERJAAN SANITAIR
Kloset Jongkok 3.00
Pipa PVC 3/4'' 70.00
Kran biasa 3/4'' 7.00
Floor Drain Besi 3.00
Wastafel keramik 4.00
Shower Kloset 3.00
J PEKERJAAN ATAP
Pek Rangka Kuda-Kuda Kayu 6/12 Kls I 45.80 0.06 0.12 1.10 0.36 kuda2
Total 0.73
Pek Gording Kayu 5/10 Kls II 116.84 0.05 0.10 1.10 0.64 atap tengah
145.50 0.05 0.10 1.10 0.80 atap kiri dan kanan
Total 1.44
Pek. Atap Spandek 0.30 mm 16.13 14.13 0.96 236.43
Total 236.43
K PEKERJAAN RESERVOIR 1 Bh
Pek. Galian Tanah Pondasi 4.80
Pek. Urugan Tanah Bekas Galian 4.16
Pek. Urugan Pasir Bawah Pondasi t. 10 cm 1.04
Pek Pas Batu Karang ad. 1 : 5 3.60
Pek Pas Batu Kosong Bawah Pondasi 5.00 5.00 0.10 1.00 2.50
M PEKERJAAN AKHIR
Dokumentasi dan Pelaporan 1.00
Pembuatan Asbuild Drawing 1.00
Pembersihan Akhir 1.00
Perhitungan kg Besi Slof
Balok
Kolom
Volume 0.03
Tinggi Q 0.3
Volume 0.045
Tinggi Q 0.2
Volume 0.03
Tinggi Q 0.3
Volume 0.09
Volume 0.125
Tinggi Q 0.15
Volume 0.0225
Volume 0.04
Volume 0.09
Volume 0.08
Tinggi Q 0.3
Volume 0.045
Tinggi Q 0.15
Volume 0.0225
Volume 0.0375
Tinggi Q 0.1
Volume 0.1
Tinggi Q 0.1
Volume 0.1
Tinggi Q 1
Volume 1
Pengumpulan 9.872 Kg 1 10
Tinggi Q 1
Volume 0.5
Tinggi Q 0.25
Volume 0.4
Volume 0.82
Tinggi Q 0.15
Volume 0.225
Tinggi Q 0.12
Volume 0.12
Volume 0.1365
Tinggi Q 0.25
Volume 0.95
Jumlah total 75
Tinggi Q 0.07
Volume 0.112
Tinggi Q 0.07
Volume 0.112
0.21
0.16
Banyak Q 6.666667
5.328
4x 0.40
0.21
Banyak Q 6.666667
5.328
5.066667 x 0.40
0.21
Banyak Q 6.666667
3.552
3.866667 x 0.40
Koefisien sat Besi Beugel
8 0.89 7.104 Ukuran BeQ 8
Panjang BQ 1.14
Banyak Q 6.666667
7.104
7.6 x 0.40
Banyak Q 6.666667
9.864
9.066667 x 0.40
Banyak Q 6.666667
2.48
3.6 x 0.40
Koefisien sat Besi Beugel
Ukuran BeQ 8
6 0.89 5.328 Panjang BQ 0.76
Banyak Q 0.066667
5.328
0.050667 x 0.40
Banyak Q 6.666667
8.982
7.2 x 0.40
Koefisien sat Besi Beugel
4 1.58 6.312 Ukuran BeQ 8
3 0.89 2.67 Panjang BQ 0.98
Banyak Q 0.066667
8.982
0.065333 x 0.40
Banyak Q 0.066667
6.23
0.050667 x 0.40
Banyak Q 0.066667
3.56
0.036 x 0.40
Banyak Q 0.066667
5.34
0.049333 x 0.40
4.113333
4.113333
Koefisien sat Besi Banyk besi
16 0.62 9.872 8
9.872
1.851
6.581333
6.17
4.113333
15.63067
16.45333
6.00 0.22
8.00 0.40
9.00 0.50
10.00 0.62
12.00 0.89
13.00 1.04
16.00 1.58
16.00 1.58
19.00 2.22
1.58 22.00 2.99
25.00 3.85
28.00 4.83
29.00 5.19
32.00 6.31
36.00 7.99
2.001333
1.527333
6p 0.22
8p 0.40
9p 0.50
10p 0.62
12p 0.89
13p 1.04
16p 1.57
16p 1.58
19p 2.23
3.002 22p 2.98
25p 3.85
28p 4.83
29p 5.19
32p 6.31
36p 7.99
9p 0.50
10p 0.62
12p 0.89
13p 1.04
16p 1.57
16p 1.58
19p 2.23
3.581333 22p 2.98
25p 3.85
28p 4.83
29p 5.19
32p 6.31
36p 7.99
1.422
0.28
0.020013
2.844
0.025807
0.020013
0.01422
0.019487