Anda di halaman 1dari 46

Paket Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN

Nama Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Kontraktor : PT.TONGKANG MAS
Konsultan : CV.BETA ALAMBA REKAYASA
DATA REKAYASA LAPANGAN
Jenis Pekerjaan : Overlay AC-BC
Mata Pemb. No. : 6.1(2) / 6.3.(6a) / 6.3.8.a / 6.3.10.a

6.3.(7a) 6.3.8.a 6.3.10.a 6.1(2)


LEBAR TEBAL
PANJANG LUAS Laston AC-BC Aspal Minyak Filler Asbuton Lapis Perekat
No. LOKASI STA L/R Volume Volume Komp. Komp. KET
Lebar Rata-2 Diterima Design Core Diterima Berat Jenis Volume Volume Lebar Tebal Volume
Kubikasi Tonase Camp. Camp.
(m) (m) (m) (m) (m) (m) (m) (m2) (m) (ton/m3) (Ton) (%) (Ton) (%) (Kg) (M) (ltr/m2) (Liter)

1 00 + 800 L/R 4.50 0.050


300.00 4.50 4.50 0.060 1,350.00 67.50 2.275 153.56 5.70 8.75 2.00 3,071.25 4.50 0.35 472.50 OVERLAY
2 01 + 100 L/R 4.50 0.050 0.060

- -
3 01 + 300 L/R 4.50 0.050
150.00 4.50 4.50 - 675.00 33.75 2.275 76.78 5.70 4.38 2.00 1,535.63 4.50 0.35 236.25 OVERLAY
4 01 + 450 L/R 4.50 0.050
-

5 01 + 750 L/R 4.50 0.050 0.060


365.00 4.50 4.50 0.060 1,642.50 82.13 2.275 186.83 5.70 10.65 2.00 3,736.69 4.50 0.35 574.88 OVERLAY
6 02 + 115 L/R 4.50 0.050

7 06 + 250 L/R 4.50 0.050 0.060


50.00 4.50 4.50 0.060 225.00 11.25 2.275 25.59 5.70 1.46 2.00 511.88 4.50 0.35 78.75
8 06 + 300 L/R 4.50 0.050

9 06 + 725 L/R 4.50 0.050 0.060


50.00 4.50 4.50 0.060 225.00 11.25 2.275 25.59 5.70 1.46 2.00 511.88 4.50 0.35 78.75
10 06 + 775 L/R 4.50 0.050

11 07 + 300 L/R 4.50 0.050 0.060


50.00 4.50 4.50 0.060 225.00 11.25 2.275 25.59 5.70 1.46 2.00 511.88 4.50 0.35 78.75
12 07 + 350 L/R 4.50 0.050

SUB TOTAL 965.00 493.96 28.16 9,879.19 1,519.88

Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor


PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR CV.BETA ALAMBA REKAYASA PT.TONGKANG MAS

RUDI SUSILO,ST DHARMA ARISYANDI,ST M.TAUFIQ, ST


NIP.19711022199403.1002 Supervision Engineer General Superintendent
DATA REKAYASA LAPANGAN

Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN


Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Kontraktor : PT.TONGKANG MAS
Konsultan : CV.BETA ALAMBA REKAYASA
Item Pekerjaan : TIMBUNAN BIASA

L/R
PANJANG LEBAR LUAS TEBAL VOLUME KET
NO STA - STA
/CL
(M) (M) ( M2 ) (M) ( M3 )
1 07+200 - 07+250 FULL 50.00 5.50 275.00 0.25 68.75
2 07+250 - 07+300 FULL 50.00 5.50 275.00 0.25 68.75
3 07+300 - 07+350 FULL 50.00 5.50 275.00 0.25 68.75
4 07+350 - 07+400 FULL 50.00 5.50 275.00 0.25 68.75
5 07+400 - 07+450 FULL 50.00 5.50 275.00 0.25 68.75
6 07+450 - 07+500 FULL 50.00 5.50 275.00 0.25 68.75
7 07+500 - 07+550 FULL 50.00 5.50 275.00 0.25 68.75
8 07+550 - 07+600 FULL 50.00 5.50 275.00 0.25 68.75
9 07+600 - 07+650 FULL 50.00 5.50 275.00 0.25 68.75
10 07+650 - 07+700 FULL 50.00 5.50 275.00 0.25 68.75
11 07+700 - 07+750 FULL 50.00 5.50 275.00 0.25 68.75
12 07+750 - 07+800 FULL 50.00 5.50 275.00 0.25 68.75
13 07+800 - 07+850 FULL 50.00 5.50 275.00 0.25 68.75
14 07+850 - 07+900 FULL 50.00 5.50 275.00 0.25 68.75
15 07+900 - 07+950 FULL 50.00 5.50 275.00 0.25 68.75
16 07+950 - 08+000 FULL 50.00 5.50 275.00 0.25 68.75
17 08+000 - 08+050 FULL 50.00 5.50 275.00 0.25 68.75
18 08+050 - 08+100 FULL 50.00 5.50 275.00 0.25 68.75
19 08+100 - 08+150 FULL 50.00 5.50 275.00 0.25 68.75
20 08+150 - 08+200 FULL 50.00 5.50 275.00 0.25 68.75

Sub total : 1,000.00 5,500.00 1,375.00

GAMBAR : 5.50

TIMBUNAN TANAH BIASA

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR

PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA PT.TONGKANG MAS

h a l ………..1
DATA REKAYASA LAPANGAN

Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN


Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Kontraktor : PT.TONGKANG MAS
Konsultan : CV.BETA ALAMBA REKAYASA
Item Pekerjaan : TIMBUNAN BIASA

L/R
PANJANG LEBAR LUAS TEBAL VOLUME KET
NO STA - STA
/CL
(M) (M) ( M2 ) (M) ( M3 )
21 08+200 - 08+250 FULL 50.00 5.50 275.00 0.25 68.75
22 08+250 - 08+300 FULL 50.00 5.50 275.00 0.25 68.75
23 08+300 - 08+350 FULL 50.00 5.50 275.00 0.25 68.75
24 08+350 - 08+400 FULL 50.00 5.50 275.00 0.25 68.75
25 08+400 - 08+450 FULL 50.00 5.50 275.00 0.25 68.75
26 08+450 - 08+500 FULL 50.00 5.50 275.00 0.25 68.75
27 08+500 - 08+550 FULL 50.00 5.50 275.00 0.25 68.75
28 08+550 - 08+600 FULL 50.00 5.50 275.00 0.25 68.75
29 08+600 - 08+650 FULL 50.00 5.50 275.00 0.25 68.75
30 08+650 - 08+700 FULL 50.00 5.50 275.00 0.25 68.75
31 08+700 - 08+750 FULL 50.00 5.50 275.00 0.25 68.75
32 08+750 - 08+800 FULL 50.00 5.50 275.00 0.25 68.75
33 08+800 - 08+850 FULL 50.00 5.50 275.00 0.25 68.75
34 08+850 - 08+900 FULL 50.00 5.50 275.00 0.25 68.75
35 08+900 - 08+950 FULL 50.00 5.50 275.00 0.25 68.75
36 08+950 - 09+000 FULL 50.00 5.50 275.00 0.25 68.75
37 09+000 - 09+050 FULL 50.00 5.50 275.00 0.25 68.75
38 09+050 - 09+100 FULL 50.00 5.50 275.00 0.25 68.75
39 09+100 - 09+150 FULL 50.00 5.50 275.00 0.25 68.75
40 09+150 - 09+200 FULL 50.00 5.50 275.00 0.25 68.75

Sub total : 1,000.00 5,500.00 1,375.00


GAMBAR : 5.50

TIMBUNAN TANAH BIASA

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR


PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA PT.TONGKANG MAS

h a l ………..2
DATA REKAYASA LAPANGAN
Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN
Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR

Kontraktor : PT.TONGKANG MAS

Konsultan : CV.BETA ALAMBA REKAYASA

Item Pekerjaan : TIMBUNAN BIASA

L/R
PANJANG LEBAR LUAS TEBAL VOLUME KET
NO STA - STA
/CL
(M) (M) ( M2 ) (M) ( M3 )
41 09+200 - 09+250 FULL 50.00 5.50 275.00 0.25 68.75
42 09+250 - 09+300 FULL 50.00 5.50 275.00 0.25 68.75
43 09+300 - 09+350 FULL 50.00 5.50 275.00 0.25 68.75
44 09+350 - 09+400 FULL 50.00 5.50 275.00 0.25 68.75
45 09+400 - 09+450 FULL 50.00 5.50 275.00 0.25 68.75
46 09+450 - 09+500 FULL 50.00 5.50 275.00 0.25 68.75
47 09+500 - 09+550 FULL 50.00 5.50 275.00 0.25 68.75
48 09+550 - 09+600 FULL 50.00 5.50 275.00 0.25 68.75
49 09+600 - 09+650 FULL 50.00 5.50 275.00 0.25 68.75
50 09+650 - 09+700 FULL 50.00 5.50 275.00 0.25 68.75
51 09+700 - 09+750 FULL 50.00 5.50 275.00 0.25 68.75
52 09+750 - 09+800 FULL 50.00 5.50 275.00 0.25 68.75
53 09+800 - 09+850 FULL 50.00 5.50 275.00 0.25 68.75
54 09+850 - 09+900 FULL 50.00 5.50 275.00 0.25 68.75
55 09+900 - 09+950 FULL 50.00 5.50 275.00 0.25 68.75
56 09+950 - 10+000 FULL 50.00 5.50 275.00 0.25 68.75
57 10+000 - 10+050 FULL 50.00 5.50 275.00 0.25 68.75
58 10+050 - 10+100 FULL 50.00 5.50 275.00 0.25 68.75
59 10+100 - 10+150 FULL 50.00 5.50 275.00 0.25 68.75
60 10+150 - 10+200 FULL 50.00 5.50 275.00 0.25 68.75

Sub total : 1,000.00 5,500.00 1,375.00


GAMBAR : 5.50

TIMBUNAN TANAH BIASA

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR

PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA PT.TONGKANG MAS

h a l ………..3
DATA REKAYASA LAPANGAN

Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN

Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR

Kontraktor : PT.TONGKANG MAS

Konsultan : CV.BETA ALAMBA REKAYASA

Item Pekerjaan : TIMBUNAN BIASA

L/R
PANJANG LEBAR LUAS TEBAL VOLUME KET
NO STA - STA
/CL
(M) (M) ( M2 ) (M) ( M3 )
61 10+200 - 10+250 FULL 50.00 5.50 275.00 0.25 68.75
62 10+250 - 10+300 FULL 50.00 5.50 275.00 0.25 68.75
63 10+300 - 10+350 FULL 50.00 5.50 275.00 0.25 68.75
64 10+350 - 10+400 FULL 50.00 5.50 275.00 0.25 68.75
65 10+400 - 10+450 FULL 50.00 5.50 275.00 0.25 68.75
66 10+450 - 10+500 FULL 50.00 5.50 275.00 0.25 68.75
67 10+500 - 10+550 FULL 50.00 5.50 275.00 0.25 68.75
68 10+550 - 10+600 FULL 50.00 5.50 275.00 0.25 68.75
69 10+600 - 10+650 FULL 50.00 5.50 275.00 0.25 68.75
70 10+650 - 10+700 FULL 50.00 5.50 275.00 0.25 68.75
71 10+700 - 10+750 FULL 50.00 5.50 275.00 0.25 68.75
72 10+750 - 10+800 FULL 50.00 5.50 275.00 0.25 68.75
73 10+800 - 10+850 FULL 50.00 5.50 275.00 0.25 68.75
74 10+850 - 10+900 FULL 50.00 5.50 275.00 0.25 68.75
75 10+900 - 10+950 FULL 50.00 5.50 275.00 0.25 68.75
76 10+950 - 11+000 FULL 50.00 5.50 275.00 0.25 68.75
77 11+000 - 11+050 FULL 50.00 5.50 275.00 0.25 68.75
78 11+050 - 11+100 FULL 50.00 5.50 275.00 0.25 68.75
79 11+100 - 11+150 FULL 50.00 5.50 275.00 0.25 68.75
80 11+150 - 11+200 FULL 50.00 5.50 275.00 0.25 68.75

Sub total : 1,000.00 5,500.00 1,375.00


GAMBAR : 5.50

TIMBUNAN TANAH BIASA

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR

PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA PT.TONGKANG MAS

h a l ………..4
DATA REKAYASA LAPANGAN

Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN

Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR

Kontraktor : PT.TONGKANG MAS

Konsultan : CV.BETA ALAMBA REKAYASA

Item Pekerjaan : TIMBUNAN BIASA

L/R
PANJANG LEBAR LUAS TEBAL VOLUME KET
NO STA - STA
/CL
(M) (M) ( M2 ) (M) ( M3 )
61 11+200 - 11+250 FULL 50.00 5.50 275.00 0.25 68.75
62 11+250 - 11+300 FULL 50.00 5.50 275.00 0.25 68.75
63 11+300 - 11+350 FULL 50.00 5.50 275.00 0.25 68.75
64 11+350 - 11+400 FULL 50.00 5.50 275.00 0.25 68.75
65 11+400 - 11+450 FULL 50.00 5.50 275.00 0.25 68.75
66 11+450 - 11+500 FULL 50.00 5.50 275.00 0.25 68.75
67 11+500 - 11+550 FULL 50.00 5.50 275.00 0.25 68.75
68 11+550 - 11+600 FULL 50.00 5.50 275.00 0.25 68.75
69 11+600 - 11+650 FULL 50.00 5.50 275.00 0.25 68.75
70 11+650 - 11+700 FULL 50.00 5.50 275.00 0.25 68.75
71 11+700 - 11+750 FULL 50.00 5.50 275.00 0.25 68.75
72 11+750 - 11+800 FULL 50.00 5.50 275.00 0.25 68.75
73 11+800 - 11+850 FULL 50.00 5.50 275.00 0.25 68.75
74 11+850 - 11+900 FULL 50.00 5.50 275.00 0.25 68.75

Sub total : 700.00 3,850.00 962.50

GAMBAR : 5.50

TIMBUNAN TANAH BIASA

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR

PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA PT.TONGKANG MAS


h a l ………..5
DATA REKAYASA LAPANGAN
REKAPITULASI AGREGAT KLS. B
Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN
Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Kontraktor : PT.TONGKANG MAS
Konsultan : CV.BETA ALAMBA REKAYASA
Item Pekerjaan : Agg.Klas B

L/R
PANJANG VOLUME KET
NO STA - STA
/CL
(M) ( M3 )

1 07+050 - 08+050 FULL 1000.00 1,000.00

2 08+050 - 09+050 FULL 1000.00 1,000.00

3 09+050 - 10+050 FULL 1000.00 1,000.00

4 10+050 - 11+050 FULL 1000.00 1,000.00

5 11+050 - 11+750 FULL 1000.00 850.00

Sub total : 5,000.00 4,850.00

GAMBAR : 5.50

AGREGAT KLS. B

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR


PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA PT.TONGKANG MAS

h a l ………..1
GRAFIK PENANGGANAN
DATA REKAYASA LAPANGAN

Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN


Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Kontraktor : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Konsultan : CV.BETA ALAMBA REKAYASA
Item Pekerjaan : Agg.Klas B

L/R
PANJANG LEBAR LUAS TEBAL VOLUME KET
NO STA - STA
/CL
(M) (M) ( M2 ) (M) ( M3 )
1 07+050 - 07+100 FULL 50.00 5.00 250.00 0.20 50.00
2 07+100 - 07+150 FULL 50.00 5.00 250.00 0.20 50.00
3 07+150 - 07+200 FULL 50.00 5.00 250.00 0.20 50.00
4 07+200 - 07+250 FULL 50.00 5.00 250.00 0.20 50.00
5 07+250 - 07+300 FULL 50.00 5.00 250.00 0.20 50.00
6 07+300 - 07+350 FULL 50.00 5.00 250.00 0.20 50.00
7 07+350 - 07+400 FULL 50.00 5.00 250.00 0.20 50.00
8 07+400 - 07+450 FULL 50.00 5.00 250.00 0.20 50.00
9 07+450 - 07+500 FULL 50.00 5.00 250.00 0.20 50.00
10 07+500 - 07+550 FULL 50.00 5.00 250.00 0.20 50.00
11 07+550 - 07+600 FULL 50.00 5.00 250.00 0.20 50.00
12 07+600 - 07+650 FULL 50.00 5.00 250.00 0.20 50.00
13 07+650 - 07+700 FULL 50.00 5.00 250.00 0.20 50.00
14 07+700 - 07+750 FULL 50.00 5.00 250.00 0.20 50.00
15 07+750 - 07+800 FULL 50.00 5.00 250.00 0.20 50.00
16 07+800 - 07+850 FULL 50.00 5.00 250.00 0.20 50.00
17 07+850 - 07+900 FULL 50.00 5.00 250.00 0.20 50.00
18 07+900 - 07+950 FULL 50.00 5.00 250.00 0.20 50.00
19 07+950 - 08+000 FULL 50.00 5.00 250.00 0.20 50.00
20 08+000 - 08+050 FULL 50.00 5.00 250.00 0.20 50.00

Sub total : 1,000.00 5,000.00 1,000.00

GAMBAR : 5.00

AGREGAT KLS.B

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR

PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA CV.BETA ALAMBA REKAYASA

h a l ………..1
DATA REKAYASA LAPANGAN

Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN


Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Kontraktor : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Konsultan : CV.BETA ALAMBA REKAYASA
Item Pekerjaan : Agg.Klas B

L/R
PANJANG LEBAR LUAS TEBAL VOLUME KET
NO STA - STA
/CL
(M) (M) ( M2 ) (M) ( M3 )
21 08+050 - 08+100 FULL 50.00 5.00 250.00 0.20 50.00
22 08+100 - 08+150 FULL 50.00 5.00 250.00 0.20 50.00
23 08+150 - 08+200 FULL 50.00 5.00 250.00 0.20 50.00
24 08+200 - 08+250 FULL 50.00 5.00 250.00 0.20 50.00
25 08+250 - 08+300 FULL 50.00 5.00 250.00 0.20 50.00
26 08+300 - 08+350 FULL 50.00 5.00 250.00 0.20 50.00
27 08+350 - 08+400 FULL 50.00 5.00 250.00 0.20 50.00
28 08+400 - 08+450 FULL 50.00 5.00 250.00 0.20 50.00
29 08+450 - 08+500 FULL 50.00 5.00 250.00 0.20 50.00
30 08+500 - 08+550 FULL 50.00 5.00 250.00 0.20 50.00
31 08+550 - 08+600 FULL 50.00 5.00 250.00 0.20 50.00
32 08+600 - 08+650 FULL 50.00 5.00 250.00 0.20 50.00
33 08+650 - 08+700 FULL 50.00 5.00 250.00 0.20 50.00
34 08+700 - 08+750 FULL 50.00 5.00 250.00 0.20 50.00
35 08+750 - 08+800 FULL 50.00 5.00 250.00 0.20 50.00
36 08+800 - 08+850 FULL 50.00 5.00 250.00 0.20 50.00
37 08+850 - 08+900 FULL 50.00 5.00 250.00 0.20 50.00
38 08+900 - 08+950 FULL 50.00 5.00 250.00 0.20 50.00
39 08+950 - 09+000 FULL 50.00 5.00 250.00 0.20 50.00
40 09+000 - 09+050 FULL 50.00 5.00 250.00 0.20 50.00

Sub total : 1,000.00 5,000.00 1,000.00


GAMBAR : 5.00

AGREGAT KLS.B

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR


PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA CV.BETA ALAMBA REKAYASA

h a l ………..2
DATA REKAYASA LAPANGAN
Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN
Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR

Kontraktor : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR

Konsultan : CV.BETA ALAMBA REKAYASA

Item Pekerjaan : Agg.Klas B

L/R
PANJANG LEBAR LUAS TEBAL VOLUME KET
NO STA - STA
/CL
(M) (M) ( M2 ) (M) ( M3 )
41 09+050 - 09+100 FULL 50.00 5.00 250.00 0.20 50.00
42 09+100 - 09+150 FULL 50.00 5.00 250.00 0.20 50.00
43 09+150 - 09+200 FULL 50.00 5.00 250.00 0.20 50.00
44 09+200 - 09+250 FULL 50.00 5.00 250.00 0.20 50.00
45 09+250 - 09+300 FULL 50.00 5.00 250.00 0.20 50.00
46 09+300 - 09+350 FULL 50.00 5.00 250.00 0.20 50.00
47 09+350 - 09+400 FULL 50.00 5.00 250.00 0.20 50.00
48 09+400 - 09+450 FULL 50.00 5.00 250.00 0.20 50.00
49 09+450 - 09+500 FULL 50.00 5.00 250.00 0.20 50.00
50 09+500 - 09+550 FULL 50.00 5.00 250.00 0.20 50.00
51 09+550 - 09+600 FULL 50.00 5.00 250.00 0.20 50.00
52 09+600 - 09+650 FULL 50.00 5.00 250.00 0.20 50.00
53 09+650 - 09+700 FULL 50.00 5.00 250.00 0.20 50.00
54 09+700 - 09+750 FULL 50.00 5.00 250.00 0.20 50.00
55 09+750 - 09+800 FULL 50.00 5.00 250.00 0.20 50.00
56 09+800 - 09+850 FULL 50.00 5.00 250.00 0.20 50.00
57 09+850 - 09+900 FULL 50.00 5.00 250.00 0.20 50.00
58 09+900 - 09+950 FULL 50.00 5.00 250.00 0.20 50.00
59 09+950 - 10+000 FULL 50.00 5.00 250.00 0.20 50.00
60 10+000 - 10+050 FULL 50.00 5.00 250.00 0.20 50.00

Sub total : 1,000.00 5,000.00 1,000.00


GAMBAR : 5.00

AGREGAT KLS.B

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR

PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA CV.BETA ALAMBA REKAYASA

h a l ………..3
DATA REKAYASA LAPANGAN

Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN

Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR

Kontraktor : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR

Konsultan : CV.BETA ALAMBA REKAYASA

Item Pekerjaan : Agg.Klas B

L/R
PANJANG LEBAR LUAS TEBAL VOLUME KET
NO STA - STA
/CL
(M) (M) ( M2 ) (M) ( M3 )
61 10+050 - 10+100 FULL 50.00 5.00 250.00 0.20 50.00
62 10+100 - 10+150 FULL 50.00 5.00 250.00 0.20 50.00
63 10+150 - 10+200 FULL 50.00 5.00 250.00 0.20 50.00
64 10+200 - 10+250 FULL 50.00 5.00 250.00 0.20 50.00
65 10+250 - 10+300 FULL 50.00 5.00 250.00 0.20 50.00
66 10+300 - 10+350 FULL 50.00 5.00 250.00 0.20 50.00
67 10+350 - 10+400 FULL 50.00 5.00 250.00 0.20 50.00
68 10+400 - 10+450 FULL 50.00 5.00 250.00 0.20 50.00
69 10+450 - 10+500 FULL 50.00 5.00 250.00 0.20 50.00
70 10+500 - 10+550 FULL 50.00 5.00 250.00 0.20 50.00
71 10+550 - 10+600 FULL 50.00 5.00 250.00 0.20 50.00
72 10+600 - 10+650 FULL 50.00 5.00 250.00 0.20 50.00
73 10+650 - 10+700 FULL 50.00 5.00 250.00 0.20 50.00
74 10+700 - 10+750 FULL 50.00 5.00 250.00 0.20 50.00
75 10+750 - 10+800 FULL 50.00 5.00 250.00 0.20 50.00
76 10+800 - 10+850 FULL 50.00 5.00 250.00 0.20 50.00
77 10+850 - 10+900 FULL 50.00 5.00 250.00 0.20 50.00
78 10+900 - 10+950 FULL 50.00 5.00 250.00 0.20 50.00
79 10+950 - 11+000 FULL 50.00 5.00 250.00 0.20 50.00
80 11+000 - 11+050 FULL 50.00 5.00 250.00 0.20 50.00

Sub total : 1,000.00 5,000.00 1,000.00


GAMBAR : 5.00

AGREGAT KLS.B

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR

PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA CV.BETA ALAMBA REKAYASA

h a l ………..4
DATA REKAYASA LAPANGAN

Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN

Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR

Kontraktor : PT.TONGKANG MAS

Konsultan : CV.BETA ALAMBA REKAYASA

Item Pekerjaan : Agg.Klas B

L/R
PANJANG LEBAR LUAS TEBAL VOLUME KET
NO STA - STA
/CL
(M) (M) ( M2 ) (M) ( M3 )
61 11+050 - 11+100 FULL 50.00 5.00 250.00 0.20 50.00
62 11+100 - 11+150 FULL 50.00 5.00 250.00 0.20 50.00
63 11+150 - 11+200 FULL 50.00 5.00 250.00 0.20 50.00
64 11+200 - 11+250 FULL 50.00 5.00 250.00 0.20 50.00
65 11+250 - 11+300 FULL 50.00 5.00 250.00 0.20 50.00
66 11+300 - 11+350 FULL 50.00 5.00 250.00 0.20 50.00
67 11+350 - 11+400 FULL 50.00 5.00 250.00 0.20 50.00
68 11+400 - 11+450 FULL 50.00 5.00 250.00 0.20 50.00
69 11+450 - 11+500 FULL 50.00 5.00 250.00 0.20 50.00
70 11+500 - 11+550 FULL 50.00 5.00 250.00 0.20 50.00
71 11+550 - 11+600 FULL 50.00 5.00 250.00 0.20 50.00
72 11+600 - 11+650 FULL 50.00 5.00 250.00 0.20 50.00
73 11+650 - 11+700 FULL 50.00 5.00 250.00 0.20 50.00
74 11+700 - 11+750 FULL 50.00 5.00 250.00 0.20 50.00
75 11+750 - 11+800 FULL 50.00 5.00 250.00 0.20 50.00
76 11+800 - 11+850 FULL 50.00 5.00 250.00 0.20 50.00
77 11+850 - 11+900 FULL 50.00 5.00 250.00 0.20 50.00

Sub total : 850.00 4,250.00 850.00

GAMBAR : 5.00

AGREGAT KLS.B

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR

PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA CV.BETA ALAMBA REKAYASA


h a l ………..5
Paket Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN
Nama Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Kontraktor : PT.TONGKANG MAS
Konsultan : CV.BETA ALAMBA REKAYASA
DATA REKAYASA LAPANGAN
Jenis Pekerjaan : Overlay AC-BASE
Mata Pemb. No. : 6.1(2) / 6.3.(7a) / 6.3.8.a / 6.3.10.a

6.3.(7a) 6.3.8.a 6.3.10.a 6.1(2)


LEBAR TEBAL
PANJANG LUAS Laston AC-BASE Aspal Minyak Filler Asbuton Lapis Resap Pengikat
No. LOKASI STA L/R Volume Volume Komp. Komp. KET
Lebar Rata-2 Diterima Design Core Diterima Berat Jenis Volume Volume Lebar Tebal Volume
Kubikasi Tonase Camp. Camp.
(m) (m) (m) (m) (m) (m) (m) (m2) (m) (ton/m3) (Ton) (%) (Ton) (%) (Kg) (M) (ltr/m2) (Liter)

1 00 + 800 L/R 4.50 0.060


300.00 4.50 4.50 0.060 1,350.00 81.00 2.300 186.30 5.70 10.62 2.00 3,726.00 4.50 0.80 1,080.00 OVERLAY
2 01 + 100 L/R 4.50 0.060 0.060

- -
3 01 + 300 L/R 4.50 0.060
150.00 4.50 4.50 - 675.00 40.50 2.300 93.15 5.70 5.31 2.00 1,863.00 4.50 0.80 540.00
4 01 + 450 L/R 4.50 0.060
-

5 01 + 750 L/R 4.50 0.060 0.060


365.00 4.50 4.50 0.060 1,642.50 98.55 2.300 226.67 5.70 12.92 2.00 4,533.30 4.50 0.80 1,314.00
6 02 + 115 L/R 4.50 0.060

7 06 + 250 L/R 4.50 0.060 0.060


50.00 4.50 4.50 0.060 225.00 13.50 2.300 31.05 5.70 1.77 2.00 621.00 4.50 0.80 180.00
8 06 + 300 L/R 4.50 0.060

9 06 + 725 L/R 4.50 0.060 0.060


50.00 4.50 4.50 0.060 225.00 13.50 2.300 31.05 5.70 1.77 2.00 621.00 4.50 0.80 180.00
10 06 + 775 L/R 4.50 0.060

11 07 + 300 L/R 4.50 0.060 0.060


50.00 4.50 4.50 0.060 225.00 13.50 2.300 31.05 5.70 1.77 2.00 621.00 4.50 0.80 180.00
12 07 + 350 L/R 4.50 0.060

SUB TOTAL 965.00 599.27 34.16 11,985.30 3,474.00

Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor


PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR CV.BETA ALAMBA REKAYASA PT.TONGKANG MAS

RUDI SUSILO,ST DHARMA ARISYANDI,ST M.TAUFIQ, ST


NIP.19711022199403.1002 Supervision Engineer General Superintendent
Nama Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN
Nama Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Konsultan : PT.TONGKANG MAS
Kontraktor : CV.BETA ALAMBA REKAYASA
REKAPITULASI
Jenis Pekerjaan : Overlay AC-BASE
Mata Pemb. No. : 6.1(2) / 6.3.(7a) / 6.3.8.a / 6.3.10.a

6.3.(7a) 6.3.8.a 6.3.10.a


NO URAIAN STATION Laston AC-BASE Aspal Minyak Filler Asbuton
(m3) (ton/m3) (Ton) (%) (Ton) (%) (Kg)
12=10x11 13 14=12x13 15 16=14x15 17 18=14x17

1 SUB TOTAL ( 1 ) 00 + 800 - 07 + 350 599.27 34.16 11,985.30

TOTAL - 599.27 34.16 11,985.30

Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi


PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR CV.BETA ALAMBA REKAYASA
RUDI SUSILO,ST DHARMA ARISYANDI,ST
NIP.19711022199403.1002 Supervision Engineer
6.1(2)
Lapis Resap Pengikat KET
(M) (ltr/m2) (Liter)
19 20 21=4x19x20 26

3,474.00

3,474.00

Kontraktor
PT.TONGKANG MAS
M.TAUFIQ, ST
General Superintendent
DATA REKAYASA LAPANGAN

Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN


Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Kontraktor : PT.TONGKANG MAS
Konsultan : CV.BETA ALAMBA REKAYASA
Item Pekerjaan : Agg.Klas A

L/R
PANJANG LEBAR LUAS TEBAL VOLUME KET
NO STA - STA
/CL
(M) (M) ( M2 ) (M) ( M3 )
1 01+800 - 01+850 FULL 50.00 5.00 250.00 0.15 37.50
2 01+850 - 01+900 FULL 50.00 5.00 250.00 0.15 37.50
3 01+900 - 01+950 FULL 50.00 5.00 250.00 0.15 37.50
4 01+950 - 02+000 FULL 50.00 5.00 250.00 0.15 37.50
5 02+000 - 02+050 FULL 50.00 5.00 250.00 0.15 37.50
6 02+050 - 02+100 FULL 50.00 5.00 250.00 0.15 37.50
7 02+100 - 02+150 FULL 50.00 5.00 250.00 0.15 37.50
8 02+150 - 02+200 FULL 50.00 5.00 250.00 0.15 37.50
9 02+200 - 02+250 FULL 50.00 5.00 250.00 0.15 37.50
10 02+250 - 02+300 FULL 50.00 5.00 250.00 0.15 37.50

11 06+675 - 06+725 FULL 50.00 5.00 250.00 0.15 37.50 RECOND

Sub total : 550.00 2,750.00 412.50

GAMBAR : 5.50

AGREGAT KLS.A

BINA MARGA KONSULTAN SUPERVISI KONTRAKTOR


PENGAWAS LAPANGAN CV.BETA ALAMBA REKAYASA PT.TONGKANG MAS

h a l ………..1
Nama Kegiatan : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN
Nama Paket : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
Kontraktor : PT.TONGKANG MAS
Konsultan : CV.BETA ALAMBA REKAYASA
REKAPITULASI DATA REKAYASA LA
Jenis Pekerjaan : Overlay AC-BC
Mata Pemb. No. : 6.1(2) / 6.3.(6a) / 6.3.8.a / 6.3.10.a

6.3.(6a)
NO URAIAN STATION Laston AC-BC
(m3) (ton/m3) (Ton)
12=10x11 13 14=12x13

1 SUB TOTAL ( 1 ) 18 + 305 - 19 + 632 #REF!

TOTAL - #REF!

Pengawas PU Bina Marga Konsultan Supervisi

HAMZAH DEOSI ARISANDI, ST


Nip. 1958 0406 1980 031006 Inspector
A SELATAN

A REKAYASA LAPANGAN

6.3.8.a 6.3.10.a 6.1(2)


Aspal Minyak Filler Asbuton Lapis Perekat KET
(%) (Ton) (%) (Kg) (M) (ltr/m2) (Liter)
15 16=14x15 17 18=14x17 19 20 21=4x19x20 26

#REF! #REF! #REF!

#REF! #REF! #REF!

sultan Supervisi Kontraktor

SI ARISANDI, ST YURIADI
Pelaksana
DAFTAR KUANTITAS DAN HARGA ( BALANCE BUDGET )
TAHUN ANGGARAN 2012
SKPD : DINAS PU BINA MARGA SUMATERA SELATAN
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN PROVINSI SUMATERA SELATAN
PAKET : PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR
KONTRAKTOR : PT.TONGKANG MAS
KONSULTAN : CV.BETA ALAMBA REKAYASA
LOKASI : OKI PROVINSI SUMATERA SELATAN
TAHUN ANGGARAN : 2012

Kontrak Awal PEKERJAAN KURANG PEKERJAAN TAMBAH DRAFT CCO-01


No.
Uraian Pekerjaan Sat.
Divisi Volume Bobot Harga Satuan Jumlah Harga Bobot Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga

DIVISI 1 MOBILISASI

1.2 Mobilisasi Ls 1.00 4.699 156,950,000.00 156,950,000.00 4.699 1.000 156,950,000.00

DIVISI 2 DRAINASE

2.1 Galian untuk Selokan Drainase dan Saluran Air M³ 500.00 0.590 39,409.33 19,704,665.00 0.590 500.000 19,704,665.00

2.2 Pasangan Batu Mortar M³ 100.00 3.001 1,002,503.79 100,250,379.00 3.001 50.000 50,125,189.50 50.000 50,125,189.50

DIVISI PEKERJAAN TANAH

3.1.1 Galian Biasa M³ 500.00 0.561 37,480.85 18,740,425.00 0.561 500.000 18,740,425.00

3.1 (1) Timbunan Biasa M³ 500.00 1.837 122,698.96 61,349,480.00 1.837 1353.191 166,035,114.40 1853.191 227,384,594.40

DIVISI 5 PEREKERASAN BERBUTR

5.1.1 Lapis Pondasi Agregat Kls.A M³ 405.00 6.832 563,449.31 228,196,970.55 6.832 720.00 405,683,503.20 1125.00 633,880,473.75

5.1.2 Lapis Pondasi Agregat Kls.B M³ 921.95 14.575 528,055.08 486,840,381.01 14.575 578.05 305,242,238.99 1500.00 792,082,620.00

DIVISI 6 PEKRJAAN ASPAL

6.1.(1a) Lapis Resap Pengikat - Aspal Cair Liter 8,100.00 2.755 11,360.99 92,024,019.00 2.755 1,600.00 18,177,584.00 6,500.00 73,846,435.00

6.1.(2a) Lapis Perekat - Aspal Cair Liter 2,205.00 0.671 10,168.91 22,422,446.55 0.671 805.00 8,185,972.55 1,400.00 14,236,474.00

6.3.(6a) Laston Lapis Antara ( AC-BC) ( Gradasi halus/kasar) Ton 873.83 14.339 548,084.85 478,932,984.48 14.339 413.83 226,813,953.48 460.00 252,119,031.00

6.3.(7a) Laston Lapis Antara ( AC-Base) ( Gradasi halus/kasar) Ton 829.60 13.055 525,641.27 436,071,997.59 13.055 277.60 145,918,016.55 552.00 290,153,981.04

6.3.(8a) Aspal Minyak Ton 87.38 21.692 8,291,779.29 724,559,720.52 21.692 27.67 229,474,162.67 59.708 495,085,557.85

6.3.(7a) Bahan Pengisi ( Filler ) Tambahan Kg 25,745.04 2.563 3,324.85 85,598,396.24 2.563 5,505.04 18,303,432.24 20,240.00 67,294,964.00

DIVISI 7 STRUKTUR
7.9 Pasangan Batu M³ 194.21 6.540 1,124,765.91 218,440,787.38 6.540 160.00 179,962,545.60 34.210 38,478,241.78

DIVISI 8 PENGEMBALIAN KONDISI DAN PEKERJAAAN MINOR

8.1 (1) Lapis Pondasi Agregat Kls.A untuk pekerjaan minor M³ 49.50 0.944 637,109.17 31,536,903.92 0.944 49.500 31,536,903.92

8.1 (5) Campuran Aspal Panas ( CAP ) untuk pekerjaan minor M³ 68.50 5.345 2,606,358.08 178,535,528.48 5.345 68.500 178,535,528.48

JUMLAH 100.00 3,340,155,084.71 100.00 876,960,856.59 876,960,856.59 3,340,155,084.71


PPN 10 % 334,015,508.47 334,015,508.47
JUMLAH HARGA 3,674,170,593.19 3,674,170,593.19
DIBULATKAN 3,674,170,000.00 3,674,170,000.00

Mengetahui : Diperiksa Oleh - Palembang, April 2012


Pejabat Pelaksana Teknis Kegiatan KONSULTAN SUPERVISI Dibuat Oleh :
PENINGKATAN JALAN DABUK REJO - BATAS KAB. OKU TIMUR PT.BETA ALAMBA REKAYASA PT. TONGKANG MAS

RUDI SUSILO,ST DHARMA ARISYANDI,ST M. TAUFIQ, ST


Nip. 19711022199403 1 002 Site Engineering General Superintendent

Anda mungkin juga menyukai