Anda di halaman 1dari 7

ENGINEERING ESTIMATE ( EE )

REKAPITULASI DAFTAR KUANTITAS DAN HARGA


KEGIATAN : PENYEDIAAN PRASARANA DAN SARANA SANITASI BAGI MASYARAKAT
PEKERJAAN
: PEMBANGUNAN MCK

LOKASI : GORONTALO
T.A : 2024

NO. URAIAN PEKERJAAN HARGA ( Rp )


1 2 3
I PEKERJAAN PERSIAPAN 2,160,000.00

II PEKERJAAN MANDI CUCI KAKUS ( MCK ) 185,738,204.18

III PEK. PENGADAAN & PEMAS. HYDRANT 54,666,930.29

IV PEKERJAAN JALAN SETAPAK 9,689,058.78

V PEKERJAAN AKHIR 500,000.00

JUMLAH 252,754,193.25
PPn 10 % 27,802,961.26
TOTAL 280,557,154.51
DIBULATKAN 280,550,000.00

TERBILANG : "SEMBILAN PULUH JUTA RUPIAH "

Gorontalo, Maret 204


Mengetahui Diperiksa
Kepala Bidang Cipta Karya Kepala Seksi Perencanaan
Dinas Pekerjaan Umum Dinas Pekerjaan Umum

Ir. IWAN S. MOKOGINTA,M.Si HIFNY TEGELA, SE, MM


NIP. 197001271996031002 NIP. 197404042007011024
ENGINEERING ESTIMATE ( EE )

DAFTAR KUANTITAS DAN HARGA

KEGIATAN : PENYEDIAAN PRASARANA DAN SARANA SANITASI BAGI MASYARAKAT


PEKERJAAN
: PEMBANGUNAN MCK

LOKASI : GORONTALO
T.A : 2024

HARGA JUMLAH
NO. URAIAN JENIS PEKERJAAN SATUAN VOLUME SATUAN HARGA
Rp. Rp.

I PEKERJAAN PERSIAPAN Ls 1.00 2,160,000.00 2,160,000.00

II PEKERJAAN MANDI CUCI KAKUS ( MCK ) Unit 2.00 92,869,102.091 185,738,204.18

III PEK. PENGADAAN & PEMAS. HYDRANT Bh 2.00 27,333,465.147 54,666,930.29

IV PEKERJAAN JALAN SETAPAK M1 22.00 440,411.763 9,689,058.78

V PEKERJAAN AKHIR Ls 1.00 500,000.000 500,000.00

JUMLAH DIPINDAHKAN KE REKAPITULASI 252,754,193.25


ENGINEERING ESTIMATE ( EE )

DAFTAR HARGA SATUAN JADI


KEGIATAN : PENYEDIAAN PRASARANA DAN SARANA SANITASI BAGI MASYARAKAT
PEKERJAAN
: PEMBANGUNAN MCK
LOKASI : GORONTALO
T.A : 2024

HARGA JUMLAH
NO. URAIAN JENIS PEKERJAAN SATUAN VOLUME SATUAN BIAYA
Rp. Rp.
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN 2,160,000.00
1 Papan Nama Proyek Bh 1.000 250,000.00 250,000.00
2 Pek. Pembersihan Lokasi Ls 1.000 300,000.00 300,000.00
3 Administrasi dan Dokumentasi Ls 1.000 1,370,000.00 1,370,000.00
4 Pek.Pengukuran Awal Ls 1.000 240,000.00 240,000.00
II. PEKERJAAN MANDI CUCI KAKUS ( MCK ) 92,869,102.09
A. BANGUNAN 76,747,361.62
1 Galian tanah M3 2.100 107,237.50 225,198.75
2 Urugan kembali M3 0.525 76,475.00 40,149.38
3 Pasir Urug dibawah lantai Pondasi M3 0.300 157,435.00 47,230.50
4 Pasangan Batu Kali 1 : 5 M3 1.800 6,092,769.00 10,966,984.20
5 Pasangan Dinding 1/2 Batu Bata Sp. 1 : 5 M2 24.404 518,563.75 12,655,029.76
6 Plesteran Sp. 1 : 5 M2 36.328 284,199.50 10,324,399.44
7 Pek Acian Semen M2 36.328 177,330.00 6,442,044.24
8 Pek Beton Bertulang ( Sloof ) uk. 12/15 M3 0.216 ### 3,701,346.30
9 Pek Beton Bertulang ( Kolom ) uk. 11/11 M3 0.185 ### 3,170,134.56
10 Pek Ring Balok 12/15 M3 0.216 ### 3,701,346.30
11 Pengad. / Pemas Pintu ( Bahan PVC ) Set 2.000 850,000.00 1,700,000.00
12 Pek. Kap Kuda-kuda kayu kelas II M3 0.244 6,656,200.00 1,624,112.80
13 Pek. Gordeng Kayu M3 0.174 8,526,157.50 1,483,551.40
14 Atap Genteng Metal M2 18.800 102,913.50 1,934,773.80
15 Nok Atap Genteng Metal M' 9.450 173,477.50 1,639,362.37
16 Listplank papan, kayu kelas II M2 3.316 70,978.00 235,363.05
17 Rangka Plafond kayu kelas III M2 15.244 121,670.00 1,854,737.48
18 Pek. Plafond Tripleks M2 15.244 57,931.25 883,103.98
19 Pek. List Profil Sp. 3 M' 22.800 21,493.50 490,051.80
20 Cor Lantai Beton Tumbuk 1:3:5 Tbl = 7 cm M3 0.420 841,915.00 353,604.30
21 Pas. Lantai Keramik 20 x 20 cm M2 4.995 588,150.25 2,937,810.50
22 Pas. Dinding Keramik 20 x 20 cm M2 12.480 588,150.25 7,340,115.12
23 Kloset Jongkok Bh 2.000 802,527.50 1,605,055.00
24 Pegadaan Ember Bh 2.000 150,000.00 300,000.00
25 Pek Cat Dinding M2 36.328 21,171.50 769,118.25
26 Pek Cat Plafon M2 15.244 21,171.50 322,738.35
B. SEPTIC TANK 15,752,265.47
1 Galian Tanah M3 5.882 107,237.50 630,770.98
2 Pasangan Dinding 1/2 Batu Bata Sp. 1 : 3 M2 6.270 706,675.00 4,430,852.25
3 Plesteran 1 : 3 M2 8.250 388,130.75 3,202,078.69
4 Acian Semen M2 8.250 177,330.00 1,462,972.50
5 Plat beton tulangan 1 : 2 : 3 M3 0.306 ### 5,243,573.93
6 Beton Tumbuk 1 : 3 : 5 M3 0.189 841,915.00 159,121.94
7 Pipa Penguapan GIP Dia. 1 1/2" M' 1.000 147,616.30 147,616.30
8 Pipa Pembuangan PVC dia. 4" M' 6.000 79,213.15 475,278.90
C. REMBESAN 369,475.00
1 Galian Tanah M3 2.000 107,237.50 214,475.00
2 Batu Gunung M3 1.000 135,000.00 135,000.00
3 Ijuk Ikat 1.000 20,000.00 20,000.00
III. PEK. PENGADAAN & PEMAS. HYDRANT 27,333,465.15
A PEKERJAAN HYDRANT 7,506,297.56
1 Galian tanah M3 0.30 107,237.50 32,171.25
2 Urugan Pasir M3 0.58 157,435.00 91,312.30
3 Cor Beton Tanpa Tulangan Ad. 1 : 2 : 3 M3 0.54 284,199.50 153,467.73
4 Cor Beton Bertulang Ad. 1 : 2 : 3 M3 0.13 ### 2,227,662.13
5 Plesteran 1 : 5 M² 8.04 388,130.75 3,120,571.23
6 Acian Semen M² 8.04 177,330.00 1,425,733.20
7 Pek. Cat Mengkilap M² 4.08 21,171.50 86,379.72
8 Double Drat Pipa GIP Dia. 1/2 " Bh 2.00 25,000.00 50,000.00
9 Tee GIP Dia. 1" x 1/2 " Bh 1.00 23,000.00 23,000.00
10 Tap Kran 1/2 " Bh 2.00 22,000.00 44,000.00
11 Stop Kran Bronze Dia.1/2" Bh 1.00 49,000.00 49,000.00
12 Pipa GIP Dia.3/4' M' 1.00 190,000.00 190,000.00
13 Knee GIP Dia.3/4" Bh 1.00 13,000.00 13,000.00
B. PEKERJAAN PIRINGAN 19,827,167.59
1 Galian tanah M3 0.340 107,237.50 36,460.75
2 Pasangan Batu Kali 1 : 5 M3 1.360 6,092,769.00 8,286,165.84
3 Urugan Tanah dibawah lantai M3 5.000 146,395.00 731,975.00
4 Pasir Urug dibawah lantai M3 1.250 157,435.00 196,793.75
5 Cor Lantai Beton Tumbuk 1:3:5 Tbl = 7 cm M3 0.861 841,915.00 724,888.82
6 Plesteran 1 : 5 M2 17.232 284,199.50 4,897,325.78
7 Pek. Saluran Pembuangan M1 15.000 330,237.18 4,953,557.65
IV PEKERJAAN JALAN SETAPAK 440,411.76
1 Galian Tanah M3 0.015 107,237.50 1,608.56
3 Urugan Pasir M3 0.150 157,435.00 23,615.25
4 Cor Cansteen 1 : 3 : 5 M3 0.075 841,915.00 63,143.63
5 Lantai beton tumbuk 1 : 3 : 5 M3 0.300 841,915.00 252,574.50
6 Plesteran 1 : 5 M2 0.350 284,199.50 99,469.83
IV. PEKERJAAN AKHIR 500,000.00
1 Pek. Pembersihan Akhir Lokasi Ls 1.000 500,000.00 500,000.00
Nomor Jenis Pekerjaan : List Profil Sp.3
Kuantitas Pekerjaan : 1 M1
Hasil Per hari / jam :
Harga
No. Uraian Satuan Kuantitas Satuan Jumlah
Rp.
A. BAHAN
List Profil Sp.3 M1 1.100 3,500.00 3,850.00
Paku Campur Kg 0.010 20,000.00 200.00
JUMLAH HARGA BAHAN 4,050.00
B. TENAGA
Pekerja Orang 0.050 120,000.00 6,000.00
Mandor Orang 0.0030 130,000.00 390.00
Tukang Orang 0.050 150,000.00 7,500.00
Kepala Tukang Orang 0.005 150,000.00 750.00
JUMLAH HARGA TENAGA 14,640.00
C. PERALATAN

JUMLAH HARGA PERALATAN -


D. Jumlah harga, tenaga, bahan dan peralatan ( A + B + C ) 18,690.00
E. Overhead & Profit 15 % x D 2,803.50
F. Harga Satuan Pekerjaan ( D + E ) 21,493.50
ENGINEERING ESTIMATE ( EE )

DAFTAR HARGA UPAH DAN BAHAN


KEGIATAN : PENYEDIAAN PRASARANA DAN SARANA SANITASI BAGI MASYARAKAT
PEKERJAAN
: PEMBANGUNAN MCK
LOKASI : GORONTALO
T.A : 2024

HARGA SATUAN
NO. URAIAN SATUAN KET
( Rp )

1 2 3 4 5
A. UPAH
1 Pekerja OH 120,000.00
2 Mandor OH 130,000.00
3 Tukang OH 150,000.00
4 Kepala Tukang OH 150,000.00

B. BAHAN LOKAL
1 Batu Kali / Batu Belah M3 135,000.00
2 Batu Gunung M3 135,000.00
3 Batu Bata Standard Bh 750.00
4 Batu Kerikil M3 135,000.00
5 Pasir Pasang M3 115,000.00
6 Pasir Urug M3 83,000.00
7 Tanah Urug M3 75,000.00
8 Papan kayu Kls. II M3 2,900,000.00
9 Balok Kayu Kelas II M3 2,900,000.00
10 Papan kayu Kls. III M3 2,487,500.00
11 Balok Kayu Kelas III M3 2,487,500.00
12 Sirtu M3 90,000.00
13 Ijuk Ikat 20,000.00

C. BAHAN TOKO
1 Semen @ 50 Kg Sak 70,000.00 Rp. 1400 / Kg
2 Genteng Metal Lbr 43,000.00
3 Seng Plat BJLS 20 K M' 42,450.00
4 Besi Beton Kg 12,000.00
5 Kawat Beton Kg 21,000.00
6 Tripleks Lbr 55,000.00
7 Tegel Keramik 20 x 20 cm Lbr 2,500.00
9 Tegel Keramik 30 x 30 cm Lbr 5,250.00
10 Super Grout Kg 12,000.00
11 Paku Seng Kg 25,000.00
12 Paku Biasa Kg 20,000.00
1 2 3 4 5

12 Paku Tripleks Kg 21,000.00


13 Closet Jongkok Bh 300,000.00
14 Kunci Union 2 slaag Bh 65,000.00
15 Pipa Galvanis dia. 1 1/2" M' 62,500.00
16 Pipa PVC dia 4" M' 31,000.00
17 Pipa PVC dia 2" M' 10,000.00
18 Pipa GIP Dia.3/4' M' 190,000.00
19 Knee GIP Dia.3/4" Bh 13,000.00
20 Tap Kran 1/2 " Bh 26,000.00
21 Stop Kran Bronze Dia.1/2" Bh 49,000.00
22 Double Drat Pipa GIP Dia. 1/2 " Bh 25,000.00
23 Tee GIP Dia. 1" x 1/2 " Bh 23,000.00
24 Profil Sp. 3 M' 3,500.00
25 Cat Meni Kayu Kg 35,000.00
26 Cat Dasar Kg 13,500.00
27 Cat Mengkilap Kg 50,000.00
28 Nok Genteng Metal Bh 20,000.00
29 Cat Tembok Kg 20,000.00

Anda mungkin juga menyukai