Anda di halaman 1dari 4

ADDENDUM PENAMBAHAN AITEM VOLUME PEKERJAAN (RAB)

INSTANSI : DENAS PENDAPATAN DAERAH


KABUPATEN : MAYBRAT
PAKET : PENGADAAN GEDUNG KANTOR ATAU BANGUNAN LAINNYA
NO. KONTRAK : 600/045/ADD-KTRK/DPU-CK-MBT/VIII/2023

AITEM RAB VOLUME PERENCANAAN AITEM RAB VOLUME PERUBAHAN/ REALISASI DI LAPANGAN

Harga Harga
VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA
No Uraian Satuan Satuan (Rp) No Uraian Satuan Satuan (Rp)
1 Unit 2 Unit (Rp.) 1 Unit 2 Unit (Rp.)
A PEKERJAAN TAMBAHAN
1 Mobilisasi Alat Ls 1.00 101,250,000.00 101,250,000.00
2 Pematangan Khusus Lokasi (1) M³ 88.8 70,348.33 6,246,931.70
I PEKERJAAN PERSIAPAN I PEKERJAAN PERSIAPAN
2 Pembersian Awal M² 72.00 144.00 94,000.00 13,536,000.00 2 Pembersian Awal M² 72.00 144.00 94,000.00 13,536,000.00
3 Pemasangan Bowplank M 22.00 44.00 154,790.00 6,810,760.00 3 Pemasangan Bowplank M 22.00 44.00 154,790.00 6,810,760.00
4 Foto Dokumentasi + Laporan Ls 1.00 2.00 7,000,000.00 14,000,000.00 4 Foto Dokumentasi + Laporan Ls 1.00 2.00 7,000,000.00 14,000,000.00
5 Papan Nama Proyek Ls 1.00 2.00 1,500,000.00 3,000,000.00 5 Papan Nama Proyek Ls 1.00 2.00 1,500,000.00 3,000,000.00
II PEKERJAAN TANAH DAN PONDASI - - II PEKERJAAN TANAH DAN PONDASI - -
1 Galian Tanah M³ 12.30 24.59 94,000.00 2,311,610.40 1 Galian Tanah M³ 12.30 24.59 94,000.00 2,311,610.40
2 Pasangan Pondasi Batu gunung M³ 7.48 14.96 7,183,886.36 107,470,940.00 2 Pasangan Pondasi Batu gunung M³ 7.48 14.96 7,183,886.36 107,470,940.00
3 Pasangan Batu Kosong M³ 1.92 3.85 3,428,850.00 13,201,072.50 3 Pasangan Batu Kosong M³ 1.92 3.85 3,428,850.00 13,201,072.50
4 Urugan Pasir Bawah Pondasi M³ 1.85 3.70 1,623,500.00 6,014,742.80 4 Urugan Pasir Bawah Pondasi M³ 1.85 3.70 1,623,500.00 6,014,742.80
5 Urugan Pasir Bawah Lantai M³ 1.18 2.35 1,623,500.00 3,822,628.16 5 Urugan Pasir Bawah Lantai M³ 1.18 2.35 1,623,500.00 3,822,628.16
6 Urugan Tanah Kembali M³ 4.62 9.24 45,050.00 416,262.00 6 Urugan Tanah Kembali M³ 4.62 9.24 45,050.00 416,262.00
7 Urugan Tanah Dan Pemadatan M³ 4.71 9.42 1,227,500.00 11,560,889.60 7 Urugan Tanah Dan Pemadatan M³ 4.71 9.42 1,227,500.00 11,560,889.60
III PEKERJAAN KAYU - - III PEKERJAAN KAYU - -
1 Kolom Kayu besi 10/10 M³ 0.30 0.60 12,082,400.00 7,249,440.00 1 Kolom Kayu besi 10/10 M³ 0.30 0.60 12,082,400.00 7,249,440.00
2 Pekerjaan Ring Balok Kayu Besi 10/ M³ 0.22 0.44 12,082,400.00 5,316,256.00 2 Pekerjaan Ring Balok Kayu Besi 10/1 M³ 0.22 0.44 12,082,400.00 5,316,256.00
3 Kuda-kuda kayu besi 5/10 M³ 0.69 1.38 12,082,400.00 16,673,712.00 3 Kuda-kuda kayu besi 5/10 M³ 0.69 1.38 12,082,400.00 16,673,712.00
4 Pekerjaan Gording kayu besi 5/10 M³ 0.88 1.76 12,082,400.00 21,265,024.00 4 Pekerjaan Gording kayu besi 5/10 M³ 0.88 1.76 12,082,400.00 21,265,024.00
5 Pekerjaan kusen kayu besi 5/10 M³ 0.15 0.30 14,705,000.00 4,411,500.00 5 Pekerjaan kusen kayu besi 5/10 M³ 0.15 0.30 14,705,000.00 4,411,500.00
6 Pekerjaan daun jendela kaca M² 1.00 2.00 1,203,500.00 2,407,000.00 6 Pekerjaan daun jendela kaca M² 1.00 2.00 1,203,500.00 2,407,000.00
7 Pekerjaan Daun pintu M² 1.42 2.83 1,210,000.00 3,428,898.00 7 Pekerjaan Daun pintu M² 1.42 2.83 1,210,000.00 3,428,898.00
IV PEKERJAAN PASANGAN DINDING DAN LANTAI - - IV PEKERJAAN PASANGAN DINDING DAN LANTAI - -
1 Pas. Batu Tela Dinding 1 pc : 4 ps M³ 5.83 11.66 2,413,127.27 28,137,064.00 1 Pas. Batu Tela Dinding 1 pc : 4 ps M³ 5.83 11.66 2,413,127.27 28,137,064.00
2 Plesteran Dinding,t.15 mm M² 77.90 155.80 247,018.18 38,485,432.73 2 Plesteran Dinding,t.15 mm M² 77.90 155.80 247,018.18 38,485,432.73
3 Pek. Acian Dinding M² 77.90 155.80 130,590.91 20,346,063.64 3 Pek. Acian Dinding M² 77.90 155.80 130,590.91 20,346,063.64
4 Pek Lantai Beton Tumbuk M³ 1.82 3.65 379,431.82 1,383,195.93 4 Pek Lantai Beton Tumbuk M³ 1.82 3.65 379,431.82 1,383,195.93
5 Pek Pasangan Tegel 30/30 M² 11.52 23.04 558,509.09 12,868,049.45 5 Pek Pasangan Tegel 30/30 M² 11.52 23.04 558,509.09 12,868,049.45
6 Pek Pasangan Tegel 10/10 M² 1.38 2.76 558,509.09 1,541,485.09 6 Pek Pasangan Tegel 10/10 M² 1.38 2.76 558,509.09 1,541,485.09
V PEKERJAAN ATAP DAN PLAFON - - V PEKERJAAN ATAP DAN PLAFON - -
1 Atap Seng Gelombang M² 25.77 51.55 99,400.00 5,123,950.72 1 Atap Seng Gelombang M² 25.77 51.55 99,400.00 5,123,950.72
2 Rangka Plafon + tripleks 3mm M² 13.89 27.77 894,085.00 24,830,707.44 2 Rangka Plafon + tripleks 3mm M² 13.89 27.77 894,085.00 24,830,707.44
3 Pemasangan lisplank M 21.48 42.96 249,135.00 10,702,839.60 3 Pemasangan lisplank M 21.48 42.96 249,135.00 10,702,839.60
VI PEKERJAAN PENGGANTUNG DAN PENGUNCI - - VI PEKERJAAN PENGGANTUNG DAN PENGUNCI - -
1 Kunci Pintu Bh 3.00 6.00 456,050.00 2,736,300.00 1 Kunci Pintu Bh 3.00 6.00 456,050.00 2,736,300.00
2 Engsel Pintu 4" - Stainles Steel Bh 3.00 6.00 65,262.50 391,575.00 2 Engsel Pintu 4" - Stainles Steel Bh 3.00 6.00 65,262.50 391,575.00
3 Engsel Jendela Bh 3.00 6.00 45,175.00 271,050.00 3 Engsel Jendela Bh 3.00 6.00 45,175.00 271,050.00
4 Grendel Jendela / Ventilasi Bh 3.00 6.00 83,500.00 501,000.00 4 Grendel Jendela / Ventilasi Bh 3.00 6.00 83,500.00 501,000.00
5 Hak Angin Jendela Bh 3.00 6.00 65,262.50 391,575.00 5 Hak Angin Jendela Bh 3.00 6.00 65,262.50 391,575.00
VII PEKERJAAN PENGECATAN - - VII PEKERJAAN PENGECATAN - -
1 Cat Dinding M² 77.90 155.80 160,515.00 25,008,237.00 1 Cat Dinding M² 77.90 155.80 160,515.00 25,008,237.00
2 Cat Kayu Kusen M² 5.20 10.40 57,850.00 601,640.00 2 Cat Kayu Kusen M² 5.20 10.40 57,850.00 601,640.00
3 Cat Kayu Lisplank M² 8.59 17.18 50,815.00 873,204.96 3 Cat Kayu Lisplank M² 8.59 17.18 50,815.00 873,204.96
4 Cat Plafon M² 13.89 27.77 45,725.00 1,269,883.85 4 Cat Plafon M² 13.89 27.77 45,725.00 1,269,883.85
VIII PEKERJAAN AKHIR - - VIII PEKERJAAN AKHIR - -
1 Pembersihan Akhir Ls 1.00 2.00 5,100,000.00 10,200,000.00 1 Pembersihan Akhir Ls 1.00 2.00 5,100,000.00 10,200,000.00
Jumlah 428,559,989.86 Jumlah 536,056,921.56
PPN 11% 47,141,598.88 PPN 11% 58,966,261.37
Jumlah Total 475,701,588.74 Jumlah Total 595,023,182.93
Pembulatan Jumlah 475,000,000.00 Pembulatan Jumlah 595,000,000.00

Disetujui : Diketahui Oleh : Dilaksanakan Oleh :


PEJABAT PEMBUAT KOMITMEN KEPALA DINAS PEKERJAAN UMUM KONTRAKTOR
DINAS PENDAPATAN DAERAH KABUPTEN MAYBRAT CV. RIOF MASE

OKTAVIANUS ATANAY, SKM MELIANUS SAA, SH.M.Si DELILA OCE KAMAT


NIP. 19661016 199503 1 003 NIP. 19690323 199610 1 001 Direktur
LAMPIRAN BERITA ACARA PENELITIAN DRAFT JUSTIFIKASI TEKNIS
PERSETUJUAN PERUBAHAN KONTRAK (NILAI KONTRAK BERUBAH)
Nomor : ________________________600/03.bm/BA-CCO/MBT/X/2023________________________________
SATKER : Preservasi Jalan dan Jembatan Prov. Kaltim Nilai Kontrak Awal : Rp 930,000,000.00
KEGIATAN : PENATAAN TAMAN MAKAM PAHLAWAN Nilai CCO -01 : Rp -
PAKET : KONTRAKTOR : CV. MANDIRI PAPUA PERKASA
NO. KONTRAK : 600/03.bm/KTRK/DPU-BM/MBT/VIII/2023 KONSULTAN : CV. ATELIER PAPUA

No. Kontrak Awal Pekerjaan Tambah


Prosentase
Mata Uraian Satuan Harga Jumlah Penambahan Pengurangan CCO - 01 Bobot
Harga Satuan Perubahan
Satuan Kwantitas Harga Perubahan (Rupiah) Jumlah Harga Jumlah Harga (%)
Kwantitas Kwantitas Jumlah Harga (Rupiah) Kwantitas
(Rupiah) (Rupiah)
Pembayaran (Rupaih) (Rupaih)
a b c d e f = (dxe) g h i = (gxh) j k = (gxj) l = (e+h-j) m = (gxl) n
I PEKERJAAN PERSIAPAN
1 Mobilisasi Ls 167,000,000.00 1.00 167,000,000.00 - - - - - 1.00 - -
2 Pengukuran dan Pemasangan Bouwplank M¹ 111,500.00 86.00 9,589,000.00 - 100.96 - - - 186.96 - 117.40
3 Foto Dokumentasi + Laporan Ls 6,600,000.00 1.00 6,600,000.00 - - - - - 1.00 - -
4 Direksi Keet / Gudang Semen Dan Alat M² 1,657,350.00 6.00 9,944,100.00 - - - - - 6.00 - -
5 Papan Nama Proyek Ls 800,000.00 1.00 800,000.00 - - - - - 1.00 - -
6 Pekerjaan Rehabilitasi Kuburan Bh 3,000,000.00 8.00 24,000,000.00 - - - - - 8.00 - -
-
II PEKERJAAN TANAH DAN PONDASI - - - - - - -
1 Pematangan lokasi (galian tanah) M³ 210,578.00 1,340.00 282,174,520.00 - 995.00 - - - 2,335.00 - 74.25
2 Galian Tanah Fondasi M³ 48,000.00 16.27 781,017.60 - 12.36 - - - 28.63 - 75.97
3 Pasangan Pondasi Batu gunung M³ 3,778,014.29 18.28 69,043,211.07 - 17.79 - - - 36.06 - 97.34
4 Urugan Tanah Kembali M³ 23,000.00 3.97 91,383.60 - 10.34 - - - 14.32 - 260.31
5 Urugan Tanah Timbunan M³ 855,000.00 90.00 76,950,000.00 - 13.50 - - - 103.50 - 15.00
- -
III PEKERJAAN PAGAR - - - - - - - -
1 Pas. Sloof 20/20 M³ 13,100,053.81 3.44 45,064,185.10 - 4.27 - - - 7.71 - 124.19
2 Pas. Kolom 20/20 M³ 13,255,913.81 1.56 20,712,365.33 - 1.82 - - - 3.39 - 116.70
3 Pas. Batu tela M³ 2,051,732.14 4.50 9,232,794.64 - 2.83 - - - 7.33 - 62.89
4 Pek. Plesteran M² 145,837.62 72.00 10,500,308.57 - 15.34 - - - 87.34 - 21.31
5 Pek. Acian M² 79,710.71 72.00 5,739,171.43 - 49.53 - - - 121.53 - 68.79
6 Pas. Tegel M² 342,554.29 24.72 8,467,085.56 - 80.54 - - - 105.26 - 325.84
7 Pek. Pengecetan M² 149,509.00 72.00 10,764,648.00 - 289.95 - - - 361.95 - 402.70
8 Pek. Finising Kolom Pagar Ls 22,000,000.00 1.00 22,000,000.00 - - - - - 1.00 - -
9 Pek. Dinding dan Tulisan Nama Ls 28,000,000.00 1.00 28,000,000.00 - - - - - 1.00 - -
10 Pas. Pagar Besi Stenlis M 500,000.00 61.00 30,500,000.00 - 3.55 - - - 64.55 - 5.82

(A) Jumlah Harga Pekerjaan 837,953,790.90 - - -

(B) Pajak Pertambahan Nilai (PPN) = 10% x (A) 92,174,917.00 -

(C) Jumlah Harga Pekerjaan = (A) + (B) 930,128,707.90 -

(D) Pembulatan 930,000,000.00 -

PANITIA PENELITI PELAKSANAAN KONTRAK DAN NEGOSIASI HARGA

Mengetahui Kontraktor, 1. AMINADAP ATKANA ……………………………………………..


PPK CV. MANDIRI PAPUA PERKASA Ketua

2. ASER KOCU ……………………………………………..


Sekretaris

JEFRIANUS DARIUS WAIMBEWER, ST KATRINCE MAMBRASAR 3. MAKSI SAME ……………………………………………..


NIP. 19820112201203 1 001 Direktris Anggota

4. MELKIANUS JITMAU ……………………………………………..


Anggota

5. YEFTA NAUW ……………………………………………..


Anggota