HARGA JUMLAH
NO URAIAN PEKERJAAN NO. ANALISA SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6) (7)
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls Ls 1.00 200,000.00 200,000.00
2 Pengukuran dan Pemasangan Bowplank Ls Ls 1.00 500,000.00 500,000.00
Sub Total 700,000.00
B PEKERJAAN STRUKTUR
I PEKERJAAN TANAH
1 Galian Tanah Pondasi A.2.3.1.1. m3 11.88 35,000.00 415,800.00
2 Timbunan Sisi Pondasi (Tanah Bekas Galian) A.2.3.1.9. m3 3.36 30,000.00 100,782.00
3 Tanah Timbunan A.2.3.1.9. m3 8.57 51,750.00 443,620.41
Sub Total 960,202.41
II PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1:4 A.3.2.1.2 m3 3.30 1,010,735.00 3,335,425.50
2 Pasang Pondasi Rolag Bata A.4.1.1.8. m² 7.56 219,029.00 1,655,859.24
Sub Total 4,991,284.74
C PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
1 Pasang Dinding 1/2 Bata Camp. 1:4 A.4.4.1.9 m² 87.00 105,570.00 9,184,590.00
Sub Total 9,184,590.00
V PEKERJAAN PLAFOND
1 Pasang Rangka Plafond Baja Ringan A.4.6.1.20 m² 18.67 100,399.11 1,874,702.33
2 Pasang Plafond Gipsum A.4.5.1.5 m² 18.67 56,033.46 1,046,284.78
Sub Total 2,920,987.11
VI PEKERJAAN LANTAI
1 Rabat Beton Bawah Lantai A.4.1.1.1 m3 1.22 230,000.00 281,663.75
2 Pasangan Lantai Kramik 25x25 cm A.4.4.3.36. m² 24.49 474,299.58 11,616,782.38
Sub Total 11,898,446.13
DisetujuiOleh :
Kepala Sekolah SMA N 5 Binjai
Dihitung Oleh :
A.2.2.1.2 (K3) Pembuatan 1m2 pagar sementara dari seng gelombang tinggi 2 meter
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.200 80,000.00 16,000.00
Tukang Kayu OH 0.400 110,000.00 44,000.00
Kepala Tukang OH 0.020 110,000.00 2,200.00
Mandor OH 0.020 100,000.00 2,000.00
JUMLAH TENAGA KERJA 64,200.00
B. BAHAN
Dolken kayu bulat Ø 8-10/400 cm Batang 1.250 20,000.00 25,000.00
Sement Portland Kg 2.500 1,200.00 3,000.00
Seng gelombang tebal 0,2 mm Lbr 1.200 151,228.00 181,473.60
Pasir Beton M3 0.010 275,000.00 2,750.00
Kerikil Guli uk. 2-3 mm M3 0.009 425,000.00 3,825.00
Kayu balok sembarang 5/7 M3 0.070 8,000,000.00 560,000.00
Paku biasa 2" - 5" Kg 0.060 28,000.00 1,680.00
Meni Besi Liter 0.450 55,000.00 24,750.00
A. TENAGA
Pekerja OH 1.000 80,000.00 80,000.00
Mandor OH 0.032 100,000.00 3,200.00
JUMLAH TENAGA KERJA 83,200.00
B. BAHAN
A. TENAGA
Pekerja OH 1.000 #REF! #REF!
Mandor OH 0.032 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B. BAHAN
A. TENAGA
Pekerja OH 1.000 150.00 150.00
Mandor OH 0.032 425,000.00 13,600.00
JUMLAH TENAGA KERJA 13,750.00
B. BAHAN
C. PERALATAN
A.4.1.1.2 Membuat 1 M3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 1.650 80,000.00 132,000.00
Tukang OH 0.275 110,000.00 30,250.00
Kepala Tukang OH 0.028 - -
Mandor OH 0.083 - -
JUMLAH TENAGA KERJA 162,250.00
B. BAHAN
Semen Portland Kg 276.000 1,200.00 331,200.00
Pasir beton Kg 828.000 142.86 118,285.71
Kerikil Guli (maks 30 mm) Kg 1012.000 300.00 303,600.00
Air Liter 215.000 - -
JUMLAH HARGA BAHAN 753,085.71
C. PERALATAN
Concrete Mixer Plant jam 0.420 - -
Concrete Vibrator jam 0.500 - -
JUMLAH HARGA ALAT -
A.4.1.1.3 Membuat 1 M3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm, w/c = 0,72
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 1.650 80,000.00 132,000.00
Tukang OH 0.275 110,000.00 30,250.00
Kepala Tukang OH 0.028 - -
Mandor OH 0.083 - -
JUMLAH TENAGA KERJA 162,250.00
B. BAHAN
Semen Portland Kg 299.000 1,200.00 358,800.00
Pasir beton Kg 799.000 142.86 114,142.86
Kerikil Guli (maks 30 mm) Kg 1017.000 300.00 305,100.00
Air Liter 215.000 - -
JUMLAH HARGA BAHAN 778,042.86
C. PERALATAN
Concrete Mixer Plant jam 0.420 - -
Concrete Vibrator jam 0.500 - -
JUMLAH HARGA ALAT -
A.4.1.1.5. Membuat 1 M3 beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 1.650 80,000.00 132,000.00
Tukang OH 0.275 110,000.00 30,250.00
Kepala Tukang OH 0.028 110,000.00 3,080.00
Mandor OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 173,630.00
B. BAHAN
Semen Portland Kg 326.000 1,200.00 391,200.00
Pasir pasangan Kg 760.000 142.86 108,571.43
Batu Pecah 2 - 3 cm Kg 1029.000 150.00 154,350.00
Air Liter 215.000 - -
JUMLAH HARGA BAHAN 654,121.43
C. PERALATAN
Concrete Mixer Plant jam 0.420 76,000.00 31,920.00
Concrete Vibrator jam 0.500 70,000.00 35,000.00
JUMLAH HARGA ALAT 66,920.00
A.4.1.1.6 Membuat 1 M3 beton mutu f'c = 16,9 Mpa (K200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 1.650 80,000.00 132,000.00
Tukang OH 0.275 110,000.00 30,250.00
Kepala Tukang OH 0.028 110,000.00 3,080.00
Mandor OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 173,630.00
B. BAHAN
Semen Portland Kg 352.000 1,200.00 422,400.00
Pasir pasangan Kg 731.000 142.86 104,428.57
Batu Pecah 2 - 3 cm Kg 1031.000 150.00 154,650.00
Air Liter 215.000 - -
JUMLAH HARGA BAHAN 681,478.57
C. PERALATAN
Concrete Mixer Plant jam 0.420 76,000.00 31,920.00
Concrete Vibrator jam 0.500 70,000.00 35,000.00
JUMLAH HARGA ALAT 66,920.00
A.4.1.1.8. Membuat 1 M3 beton mutu f'c = 21,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 1.6500 80,000.00 132,000.00
Tukang OH 0.2750 100,000.00 27,500.00
Kepala Tukang OH 0.0280 110,000.00 3,080.00
Mandor OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 170,880.00
B. BAHAN
Semen Portland Kg 384.000 1,200.00 460,800.00
Pasir pasangan Kg 692.000 142.86 98,857.14
Batu Pecah 2 - 3 cm Kg 1039.000 150.00 155,850.00
Air Liter 215.000 - -
JUMLAH HARGA BAHAN 715,507.14
C. PERALATAN
Concrete Mixer jam 0.420 - -
Concrete Vibrator jam 0.500 - -
JUMLAH HARGA ALAT -
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0500 80,000 84,000.000
Tukang L L.02.11 OH 1.0500 110,000 115,500.00
Kepala t L.03.01 OH 0.1050 110,000 11,550.00
Mandor L.04.01 OH 0.0520 100,000 5,200.00
JUMLAH TENAGA KERJA 216,250.00
B BAHAN
Besi siku L 30.30.3 Kg 15.0000 -
Besi plat baja Kg 32.8000 -
Kawat las Kg 0.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 216,250.00
E Overhead & Profit 10% 10% 21,625.00
F Harga Satuan Pekerjaan (D+E) - 237,875.00
A.4.2.1.19 Pemasangan 1 mtr Talang 1/2 Lingkaran D-15 cm, seng plat BJLS 30 Lebar 45 cm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 0.150 80,000.00 12,000.00
Tukang OH 0.300 110,000.00 33,000.00
Kepala Tukang OH 0.030 110,000.00 3,300.00
Mandor OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 49,100.00
B. BAHAN
Seng Plat BJLS 30 Lbr 1.050 190,415.00 199,935.75
Paku 1 cm - 2,5 cm Kg 0.010 28,000.00 280.00
Besi Strip Kg 0.500 125,000.00 62,500.00
JUMLAH HARGA BAHAN 262,715.75
C. PERALATAN
A.4.2.1.22 Pemasangan 1 m2 Rangka Atap Baja Ringan Profil C75, Atap Pelana
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 0.734 80,000.00 58,720.00
Tukang OH 0.734 110,000.00 80,740.00
Kepala Tukang OH 0.073 110,000.00 8,030.00
Mandor OH 0.037 100,000.00 3,700.00
JUMLAH TENAGA KERJA 151,190.00
B. BAHAN
Baja Ringan Canal C75 m' 3.065 13,500.00 41,377.50
JUMLAH HARGA BAHAN 41,377.50
C. PERALATAN
A.4.2.1.22.b Pemasangan 1 m2 Rangka Atap Baja Ringan Profil C75, Atap Jurai
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 0.7604 80,000.00 60,832.00
Tukang OH 0.7604 110,000.00 83,644.00
Kepala Tukang OH 0.0760 110,000.00 8,360.00
Mandor OH 0.0380 100,000.00 3,800.00
JUMLAH TENAGA KERJA 156,636.00
B. BAHAN
Baja Ringan Canal C75 m' 4.050 13,500.00 54,675.00
JUMLAH HARGA BAHAN 54,675.00
C. PERALATAN
A.4.4.1.7. Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal 1/2 bata camp. 1SP:2PP
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.300 80,000.00 24,000.00
Tukang OH 0.100 110,000.00 11,000.00
Kepala Tukang OH 0.010 110,000.00 1,100.00
Mandor OH 0.020 100,000.00 2,000.00
JUMLAH TENAGA KERJA 38,100.00
B. BAHAN
Bata Merah bh 70.000 500.00 35,000.00
Semen Portland kg 18.950 1,200.00 22,740.00
Pasir Pasang m3 0.040 275,000.00 11,000.00
JUMLAH HARGA BAHAN 68,740.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.4.1.9. Pemasangan 1 m2 dinding bata merah (5x11x22)cm tebal 1/2 bata camp. 1SP:4PP
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.300 80,000.00 24,000.00
Tukang OH 0.100 110,000.00 11,000.00
Kepala Tukang OH 0.010 - -
Mandor OH 0.020 - -
JUMLAH TENAGA KERJA 35,000.00
B. BAHAN
Bata Merah bh 70.000 500.00 35,000.00
Semen Portland kg 11.500 1,200.00 13,800.00
Pasir Pasang m3 0.040 200,000.00 8,000.00
JUMLAH HARGA BAHAN 56,800.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
ANL SUPL-ACP
Memasang 1 m2 Aluminium Composit Panel (ACP)
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah Kerja Borongan Ls 1.000 120,000.00 120,000.00
B. BAHAN
Frame Hollow m' 19.50 869,688.00 16,958,916.00
Besi siku 40.40.4 kg 2.93 15,000.00 43,950.00
Aluminium Composit Panel (ACP), tebal 4 mm m2 1.05 #REF! #REF!
Dinabolt dia. 10 mm bh 8.00 6,800.00 54,400.00
Seallent tube 2.40 62,000.00 148,800.00
JUMLAH HARGA BAHAN #REF!
C. PERALATAN
Alat Bantu Ls 1.000 25,000.00 25,000.00
JUMLAH HARGA ALAT 25,000.00
Roof
Bottom /
Reng R
33-0.45 m 5.10 Rp 7,666.67 Rp 39,100.00
Self
drilling
screw
dia 6 x
20 mm
(truss
Screw) 25.00 Rp 375.00 Rp 9,375.00
Self
drilling
screw
dia 4 x
16 mm
(Roof
Bottom
Screw) 35.00 Rp 350.00 Rp 12,250.00
Dynabol dia 12 x 120 mm 1.00 Rp 1,500.00 Rp 1,500.00
Rp 99,558.33
C PERALATAN
Alat Bantu (Mesin Bor Listrik)/Genset 1.00 Rp 2,000.00 Rp 2,000.00
JUMLAH HARGA ALAT Rp 2,000.00
Gpysum
Board Lembar 0.364 Rp 99,450.00 Rp 36,199.80
Paku
Skrup Kg 0.110 Rp 35,306.00 Rp 3,883.66
JUMLAH HARGA BAHAN Rp 40,083.46
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -
A.4.6.1.2 Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela , kayu kelas II
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 7.000 80,000.00 560,000.00
Tukang Kayu OH 21.000 110,000.00 2,310,000.00
Kepala Tukang OH 2.100 110,000.00 231,000.00
Mandor OH 0.350 100,000.00 35,000.00
JUMLAH TENAGA KERJA 3,136,000.00
B. BAHAN
Balok Kayu Kelas II mᶟ 1.100 10,000,000.00 11,000,000.00
Paku 10 cm Kg 1.250 28,000.00 35,000.00
Lem Kayu Kg 1.000 15,300.00 15,300.00
JUMLAH HARGA BAHAN 11,050,300.00
C. PERLATAN
A.4.6.1.5 Pembuatan dan Pemasangan 1 m2 daun pintu panel, kayu kelas II Meranti
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 1.000 80,000.00 80,000.00
Tukang Kayu OH 3.000 110,000.00 330,000.00
Kepala Tukang OH 0.300 110,000.00 33,000.00
Mandor OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 448,000.00
B. BAHAN
Papan Kayu Kelas II mᶟ 0.040 10,000,000.00 400,000.00
Lem Kayu Kg 0.500 15,300.00 7,650.00
JUMLAH HARGA BAHAN 407,650.00
C. PERLATAN
A.4.6.1.6. Pembuatan dan Pemasangan 1 m2 daun pintu dan jendela kaca, kayu kelas II
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 0.800 80,000.00 64,000.00
Tukang Kayu OH 2.400 110,000.00 264,000.00
Kepala Tukang OH 0.240 110,000.00 26,400.00
Mandor OH 0.040 100,000.00 4,000.00
JUMLAH TENAGA KERJA 358,400.00
B. BAHAN
Papan Kayu Kelas II mᶟ 0.024 10,000,000.00 240,000.00
Lem Kayu Kg 0.300 15,300.00 4,590.00
JUMLAH HARGA BAHAN 244,590.00
C. PERLATAN
A.4.6.1.7. Pembuatan dan Pemasangan 1 m2 pintu dan jendela jalusi, kayu kelas II Meranti
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 1.000 80,000.00 80,000.00
Tukang Kayu OH 3.000 110,000.00 330,000.00
Kepala Tukang OH 0.300 110,000.00 33,000.00
Mandor OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 448,000.00
B. BAHAN
Papan Kayu Kelas II mᶟ 0.064 10,000,000.00 640,000.00
Lem Kayu Kg 0.500 15,300.00 7,650.00
JUMLAH HARGA BAHAN 647,650.00
C. PERLATAN
A.4.6.1.8 Pembuatan 1 m2 pintu Tripleks rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 0.700 80,000.00 56,000.00
Tukang Kayu OH 2.100 110,000.00 231,000.00
Kepala Tukang OH 0.210 110,000.00 23,100.00
Mandor OH 0.035 100,000.00 3,500.00
JUMLAH TENAGA KERJA 313,600.00
B. BAHAN
Papan Kayu Kelas II mᶟ 0.025 10,000,000.00 250,000.00
Paku Biasa 2"- 4" Kg 0.030 28,000.00 840.00
Lem kayu kg 0.500 15,300.00 7,650.00
Tripleks 6 mm lbr 0.500 155,000.00 77,500.00
JUMLAH HARGA BAHAN 335,990.00
C. PERLATAN
A.4.6.1.21 Pemasangan 1 m' Lisplank ukuran (3x20) cm, Kayu kelas II Meranti
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 0.1000 80,000.00 8,000.00
Tukang Kayu OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 32,700.00
B. BAHAN
Papan Kayu Kelas II mᶟ 0.0108 10,000,000.00 108,000.00
Paku Biasa 2"- 4" Kg 0.1000 28,000.00 2,800.00
JUMLAH HARGA BAHAN 110,800.00
C. PERLATAN
A.4.6.1.22. Pemasangan 1 m' Lisplank ukuran (3x30) cm, Kayu kelas II Meranti
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 0.1000 80,000.00 8,000.00
Tukang Kayu OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 32,700.00
B. BAHAN
Papan Kayu Kelas II mᶟ 0.0110 10,000,000.00 110,000.00
Paku Biasa 2"- 4" Kg 0.0500 28,000.00 1,400.00
JUMLAH HARGA BAHAN 111,400.00
C. PERLATAN
A.4.6.1.23.B Pemasangan 1 m2 Dinding Pemisah Gypsum Board uk. (120x240) cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 0.1000 80,000.00 8,000.00
Tukang Kayu OH 0.0500 110,000.00 5,500.00
Kepala Tukang OH 0.0050 110,000.00 550.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 14,550.00
B. BAHAN
Gypsum Board Tebal 9 mm Lembar 0.3640 181,229.00 65,967.36
Paku Sekrup Kg 0.1100 64,009.00 7,040.99
JUMLAH HARGA BAHAN 73,008.35
C. PERLATAN
A.4.6.1.23.C Pemasangan 1 m2 Dinding Pemisah Calsiboard uk. (120x240) cm, tebal 4mm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 0.1000 80,000.00 8,000.00
Tukang Kayu OH 0.0500 110,000.00 5,500.00
Kepala Tukang OH 0.0050 110,000.00 550.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 14,550.00
B. BAHAN
Calsiboard Tebal 4 mm Lembar 0.3640 102,000.00 37,128.00
Paku Sekrup Kg 0.1100 64,009.00 7,040.99
JUMLAH HARGA BAHAN 44,168.99
C. PERLATAN
A.4.6.1.23.D Pemasangan 1 m2 Dinding Pemisah Tripleks uk. (120x240) cm, tebal 4mm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 0.1000 80,000.00 8,000.00
Tukang Kayu OH 0.0500 110,000.00 5,500.00
Kepala Tukang OH 0.0050 110,000.00 550.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 14,550.00
B. BAHAN
Tripleks 4 mm Lembar 0.3640 105,000.00 38,220.00
Paku Sekrup Kg 0.1100 64,009.00 7,040.99
JUMLAH HARGA BAHAN 45,260.99
C. PERLATAN
A.4.6.1.23.E Pemasangan 1 m2 Dinding Pemisah Tripleks uk. (120x240) cm, tebal 9mm
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja terlatih OH 0.1000 80,000.00 8,000.00
Tukang Kayu OH 0.0500 110,000.00 5,500.00
Kepala Tukang OH 0.0050 110,000.00 550.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 14,550.00
B. BAHAN
Tripleks 9 mm Lembar 0.3640 225,000.00 81,900.00
Paku Sekrup Kg 0.1100 64,009.00 7,040.99
JUMLAH HARGA BAHAN 88,940.99
C. PERLATAN
A.4.7.1.4. Pengecatan 1m2 bidang cat kilat baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.070 80,000.00 5,600.00
Tukang Cat OH 0.009 110,000.00 990.00
Kepala Tukang OH 0.006 110,000.00 660.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 7,550.00
B. BAHAN
Cat menie Kg 0.200 65,000.00 13,000.00
Plamuur Kg 0.150 9,000.00 1,350.00
Cat dasar Kg 0.170 30,000.00 5,100.00
Cat kilat Bee Brand Kg 0.260 70,000.00 18,200.00
Kuas uk. 4" Bh 0.010 24,000.00 240.00
Pengencer Thinner kg 0.030 17,800.00 534.00
Ampelas Bh 0.010 7,000.00 70.00
JUMLAH HARGA BAHAN 38,494.00
C. PERALATAN
A.4.7.1.5. Pengecatan 1m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.070 80,000.00 5,600.00
Tukang Cat OH 0.105 110,000.00 11,550.00
Kepala Tukang OH 0.004 110,000.00 440.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 17,890.00
B. BAHAN
Cat menie Kg 0.200 65,000.00 13,000.00
Plamuur Kg 0.150 9,000.00 1,350.00
Cat dasar Kg 0.170 30,000.00 5,100.00
Cat kilat Bee Brand Kg 0.260 59,000.00 15,340.00
Kuas uk. 4" Bh 0.010 9,000.00 90.00
Pengencer Thinner kg 0.030 11,000.00 330.00
Ampelas Bh 0.010 7,000.00 70.00
JUMLAH HARGA BAHAN 35,280.00
C. PERALATAN
A.4.7.1.10. Pengecatan 1m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.020 80,000.00 1,600.00
Tukang Cat OH 0.063 110,000.00 6,930.00
Kepala Tukang OH 0.0063 - -
Mandor OH 0.0030 - -
JUMLAH TENAGA KERJA 8,530.00
B. BAHAN
Plamuur Kg 0.100 - -
Cat dasar Kg 0.100 30,000.00 3,000.00
Cat tembok Kg 0.260 60,000.00 15,600.00
JUMLAH HARGA BAHAN 18,600.00
C. PERALATAN
C. PERALATAN
A.5.1.1.2.A Pemasangan 1 buah closet Jongkok porselen setara TOTO dengan Flusher Tanam
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 1.0000 80,000.00 80,000.00
Tukang OH 1.5000 110,000.00 165,000.00
Kepala Tukang OH 0.1500 110,000.00 16,500.00
Mandor OH 0.1600 100,000.00 16,000.00
JUMLAH TENAGA KERJA 277,500.00
B. BAHAN
Kloset Jongkok Porselen Setara TOTO dengan Flusher Unit 1.0000 2,414,000.00 2,414,000.00
Semen Portland Kg 6.0000 1,200.00 7,200.00
Pasir Pasang m3 0.0100 275,000.00 2,750.00
JUMLAH HARGA BAHAN 2,423,950.00
C. PERALATAN
B. BAHAN
Kran air Unit 1.00 30,000.00 30,000.00
Seal tape bh 0.03 20,000.00 500.00
C. PERALATAN
B. BAHAN
Kayu Kls II Unit 0.50 10,000,000.00 5,000,000.00
Paku Biasa (2-4") 0.30 28,000.00 8,400.00
JUMLAH HARGA BAHAN 5,008,400.00
C. PERALATAN
B. BAHAN
Kabel NYA 3 x2,5 mm m' 9.0000 24750 222,750.00
Conduit Btg 3.0000 9350 28,050.00
Alat Bantu Ls 1.0000 1000 1,000.00
C. PERALATAN
B. BAHAN
Stop Kontak m' 1.0000 18150 18,150.00
Alat Bantu Ls 1.0000 1000 1,000.00
C. PERALATAN
B. BAHAN
Saklar Tunggal Tanam m' 1.0000 14300 14,300.00
Alat Bantu Ls 1.0000 1000 1,000.00
C. PERALATAN
B. BAHAN
Saklar Ganda Tanam m' 1.0000 18700 18,700.00
Alat Bantu Ls 1.0000 1000 1,000.00
C. PERALATAN
B. BAHAN
Saklar Triple Tanam m' 1.0000 22000 22,000.00
Alat Bantu Ls 1.0000 1000 1,000.00
C. PERALATAN
B DAFTAR BAHAN
1 AC Split Wall Mounted 0.5 PK Rp 4,500,000.00
2 AC Split Wall Mounted 2 PK Rp 7,000,000.00
3 AC Split Ceiling Cassette 2 PK Rp 16,000,000.00
4 Air kerja Rp -
5 Alarm Bell Rp 600,000.00
6 Alat Bantu Rp 2,500,000.00
7 AsbesSemen Rp 45,767.00
8 Atap Bitumen Gelombang uk.200x95 cm,tebal 3 mm Rp 160,000.00
9 Atap Zincalume tebal 0,35 Rp 11,475.00
10 Atap Sirap Kayu Rp 5,000.00
11 Baja Ringan Canal C 75 Rp 13,500.00
12 Bambu diameter 6-8/600 cm Rp 46,915.00
13 Batu Bata merah Rp 500.00
14 Batu alam/paras Rp 205,000.00
15 Batu alam Andesit Hitam Rp 180,000.00
16 Batu Kali Rp 300,000.00
17 Batu Belah Rp 475,000.00
18 Batu kerikil guli (2 - 3 cm) Rp 425,000.00
19 Batu kerikil guli (2 - 3 cm) Rp 300.00
20 Batu belah 5/10 cm Rp 212,500.00
21 Batu pecah 3 - 5 cm Rp 230,000.00
22 Batu pecah 3 - 5 cm Rp 132.22
23 Batu pecah 2 - 3 cm Rp 279,256.00
24 Batu pecah 2 - 3 cm Rp 150.00
25 Batu Koral/Batu Kacang Rp 425,000.00
26 Besi Angkur Rp 500,000.00
27 Besi Beton Polos Rp 16,500.00
28 Besi Beton Ulir Rp 28,000.00
29 Besi Profil Rp 15,000.00
30 Besi Plat Implet Rp 190,000.00
31 Besi Plat Strip Rp 125,000.00
32 Besi IWF Rp 38,583.00
33 Besi H Beam Rp 16,500.00
34 Besi Hollow 40x40x3 mm Rp 869,688.00
35 Besi Square tube Rp 150,000.00
36 Besi Tiang Lampu Hot Deep Rp 3,700,000.00
37 Besi Lis Kaca 1x1 cm Rp 10,000.00
38 Besi Wiremesh Rp 12,500.00
39 Calsiboard tebal 4 mm Rp 102,000.00
40 Cat Kilat setara Bee Brand Rp 70,000.00
41 Cat Perak setara Bee Brand Rp 70,000.00
42 Cat Tembok setara Jotun Wheatershields Rp 60,000.00
N0 NAMA BAHAN HARGA
43 Cat Tembok setara Vinilex Rp 65,000.00
44 Cat Tembok Lainya Rp 295,757.00
45 Cat Meni Besi Rp 55,000.00
46 Cat Menie kayu Rp 65,000.00
47 Cat dasar Rp 30,000.00
48 Closet duduk monoblok Setara TOTO Rp 2,550,000.00
49 Closet duduk monoblok Standart Rp 1,500,000.00
50 Closet Jongkok Porselen Rp 144,000.00
51 Closet Jongkok Porselen Setara TOTO dengan Flusher Rp 2,414,000.00
52 Coneblok HB-20 Rp 3,400.00
53 Coneblok HB-15 Rp 2,975.00
54 Coneblok HB-10 Rp 2,550.00
55 Daun Pintu Panel UPVC Lebar 80 cm Rp 986,000.00
56 Dinabolt dia. 10 mm Rp 6,800.00
57 Dokumentasi Rp 500,000.00
58 Dinding Karawang GRC (Lengkap Terpasang) Rp 1,350,000.00
59 Dolken kayu galam Ø 8 - 10 cm panjang 4 m Rp 20,000.00
60 Dolken kayu galam Ø 8 - 10 cm panjang 4 m Rp 5,000.00
61 Door Closer Rp 178,500.00
62 Door Holder Rp 89,000.00
63 Door Stop Rp 25,500.00
64 DOWNLIGHT (DN027B LED9/WW D150 RD) Rp 250,000.00
65 Engsel pintu Biasa 4" Rp 40,715.00
66 Engsel pintu tanam Rp 450,000.00
67 Engsel Floorhinge 84 BTS setara Dekson Rp 1,800,000.00
68 Engsel Pivot Rp 59,000.00
69 Engsel Jendela Biasa 3" Rp 8,000.00
70 Engsel Jendela Casement 12" Rp 48,500.00
71 Fitting - Fitting Rp 500,000.00
72 Fitting - Fitting Rp 500,000.00
73 Fitting - Fitting Rp 1,000,000.00
74 Flood drain Rp 200,000.00
75 Floor drain stainless steel Rp 125,000.00
76 Floor deck tebal 0,75 mm Rp 4,500.00
77 Floor hardener Rp 90,000.00
78 Frame Aluminium Hollow Rp 181,229.00
79 Gate valve ø 25 Rp 250,000.00
80 Gypsum board tebal 9 mm Rp 60,000.00
81 Gentenng metal 0.35 mm Rp 20,500.00
82 Gayung Rp 260,000.00
83 HPL Rp 16,993.00
84 Hak Angin Jendela Rp 129,870.00
85 Handle/Tarikan Pintu Stainless Minimalis uk. 35 cm Rp 25,350.00
86 Handle Jendela rambuncis Rp 10,000.00
87 Handle/Tarikan Jendela Rp 93,926.00
88 Horn / Strobe Rp 600,000.00
89 Ijuk Rp 320,000.00
90 Instalasi Penerangan Rp 350,000.00
91 Instalasi Stop Kontak Rp 450,000.00
92 Instalasi Convensional Detector FRC 2 x 1,5mm Rp 750,000.00
93 Jet Wahser TOTO Rp 148,500.00
94 Jendela nako (Rangka + Kaca Tebal 5 mm) Rp 390,000.00
95 Jerjak Besi biasa
96 Kabel Kontrol NYY 3x2.5 mm2 c/w isolasi Rp 25,000.00
97 Kaca cermin tebal 5 mm Rp 91,000.00
98 Kaca Rayben tebal 5 mm Rp 169,000.00
N0 NAMA BAHAN HARGA
99 Kaca Rayben tebal 8 mm Rp 292,500.00
100 Kaca Rayben tebal 10 mm Rp 500,500.00
101 Kaca Tempered 8 mm Rp 533,000.00
102 Kaca Tempered 10 mm Rp 598,000.00
103 Kaca Tempered 12 mm Rp 1,316,000.00
Kaca Tempered Laminated tebal (5+0,38+5)mm, Komposisi Kaca+PVB+Kaca
104 Rp 122,500.00
105 Kaca polos 5 mm Rp 160,000.00
106 Kaca polos 6 mm Rp 270,000.00
107 Kaca polos 8 mm Rp 300,300.00
108 Kaca Reflective 5 mm Stopsol Rp 385,000.00
109 Kaca Reflective 6 mm Stopsol Rp 499,800.00
110 Kaca Reflective 8 mm Stopsol Rp 776,300.00
111 Kaca Low-E tebal 6 mm Sunergy Rp 1,001,000.00
N0 NAMA BAHAN HARGA
112 Kaca Low-E tebal 8 mm Sunergy Rp 12,000,000.00
113 Kayu Papan / Broti (Setara Kelas I) Rp 10,000,000.00
114 Kayu Papan / Broti (Setara Kelas II) Rp 8,000,000.00
115 Kayu Papan / Broti (Setara Kelas III) Rp 17,500.00
116 Kawat Beton Rp 200,000.00
117 Kawat las Rp 45,870.00
118 Kawat Duri Rp 36,250.00
119 Kawat jaring Rp 7,200.00
120 Kawat dia. 4 mm Rp 6,826.00
121 Keramik uk. 20 x 20 cm Rp 10,400.00
122 Keramik uk. 30 x 30 cm Rp 12,975.00
123 Keramik uk. 40 x 40 cm Rp 30,000.00
124 Keramik uk. 30 x 60 cm Rp 56,100.00
125 Keramik uk. 60 x 60 cm Rp 95,000.00
126 Granit uk. 60 x 60 cm Rp 3,500.00
127 Keramik uk. 20 x 25 cm Rp 6,000.00
128 Keramik uk. 20 x 40 cm Rp 8,755.00
129 Keramik uk. 25 x 40 cm Rp 30,000.00
130 Kran air Ø1/2" - 3/4" Rp 100,000.00
131 Kran Wastafel Rp 2,450,000.00
132 Kursi Tunggu 4 Seet Rp 35,000.00
133 Lisplank GRC tebal 9 mm Rp 800,000.00
134 Granit Tile uk. 120 x 120 cm Rp 24,000.00
135 Kuas Rp 43,560.00
136 Kunci Silinder Rp 217,800.00
137 Kunci Tanam Antik Rp 80,586.00
138 Kunci Tanam Biasa Rp 275,000.00
139 Kunci tanam pintu kaca Rp 180,000.00
140 Kunci tanam uk. 4" setara SES GOLD Rp 162,500.00
141 Kunci Pintu Pisah Handle/Rosses Rp 13,050.00
142 Kunci Slot/Grendel Rp 1,750,000.00
143 Lampu LED 90 watt dan Kelengkapannya Rp 15,300.00
144 LED Panel G2 (RC091V LED36S/865 PSU W30L120 GM G2) Rp 1,000,000.00
145 Lem kayu Rp 19,550.00
146 Lem fox Rp 25,000.00
147 List aluminium T Rp 10,200.00
148 List profil kayu Rp 267,600.00
149 Lock Bottom + Cilinder Pintu Kaca Rp 29,000.00
150 Minyak Bekisting Rp 25,000.00
151 Minyak Cat/Pengencer Rp 88,000.00
152 Main Control Fire Alarm Conventional 5 Zone c/w Battery Rp 15,000,000.00
153 Smoke Detector Rp 600,000.00
154 Matrial Bantu Rp 3,000,000.00
155 Manual Call Point Rp 500,000.00
156 Nok/Ridge Onduline Rp 286,000.00
157 Over Panel Pivot Pintu Kaca PT 30 Rp 198,000.00
158 Patch Fitting Pintu Kaca PT 30 Rp 28,000.00
159 Paku Biasa 2"- 4" Rp 995.00
160 Paku Pancing 6x23 Rp 64,009.00
161 Paku sekrup Rp 200.00
162 Paku sekrup 1 cm - 2,5 cm Rp 500.00
163 Paku sekrup 3,5" Rp 1,000.00
164 Paku sekrup fixer Rp 55,000.00
165 Paku Seng Rp 32,000.00
166 Paku Beton Rp 9,000.00
167 Panel Listrik Rp 13,000,000.00
N0 NAMA BAHAN HARGA
168 Plamur Rp 9,557.00
169 Plint Vinyl uk. 15 x 30 cm Rp 71,400.00
170 Plywood 4 mm uk. 90x220 cm Rp 306,000.00
171 Parquet 1,2 x 5 x 30 cm (Kayu Kelas I) Rp 178,500.00
172 Parquet 1,2 x 5 x 20 cm (Kayu Kelas II) Rp 275,000.00
173 Pasir Pasang / Beton Rp 142.86
174 Pasir Pasang / Beton Rp 200,000.00
175 Pasir Urug Rp 467,544.00
176 Paving Blok tebal 6 cm K125 Rp 83,600.00
177 Paving Blok tebal 8 cm K175 Rp 820,000.00
178 Pipa PVC AW ø 25 Rp 35,000.00
179 Pipa PVC AW ø 20 Rp 25,000.00
180 Pipa PVC AW ø 40 Rp 70,000.00
181 Pipa PVC AW ø 80 Rp 130,000.00
182 Pipa PVC AW ø 100 Rp 400,000.00
183 Pipa Reff 1/4 x 3/8 c/w isolasi Rp 90,000.00
184 Pipa Reff 1/4 x 1/2 c/w isolasi Rp 130,000.00
185 Pipa Drain 3/4" c/w Isolasi Rp 30,000.00
186 Pintu Gulung Besi (Rolling Door) Rp 820,000.00
187 Pintu Gulung Alluminium (Rolling Door) Rp 1,050,000.00
188 Pintu lipat (folding door) Rp 51,000.00
189 Politur Rp 260,000.00
190 Polycarbonat Rp 22,000.00
191 Prime Cote Rp 110,000.00
192 Profil Aluminium 4" warna Rp 100,000.00
193 Profil Aluminium 4" silver Rp 100,000.00
194 Profil Aluminium 3" warna Rp 90,000.00
195 Profil Aluminium 3" silver Rp 90,000.00
196 Profil Pintu Kaca Aluminium Rp 51,000.00
197 Profil Bingkai Aluminium Strip Rp 20,000.00
198 Profil List Kaca Rp 258,000.00
199 Profil kusen UPVC Rp 456,000.00
200 Profil Bingkai Daun Pintu UPVC Rp 300,000.00
201 Profil Bingkai Daun Jendela UPVC Rp 510,000.00
202 Panel Daun Pintu UPVC Rp 480,000.00
203 Jalusi Kusen UPVC Rp 200,000.00
204 Rangka atap baja ringan Rp 20,000.00
205 Rangka Furing Utama (Main Tee) Rp 18,500.00
206 Rangka Furing Silang (Cross Tee) Rp 34,000.00
207 Rangka Furing Ke dinding (Wall Angle) Rp 6,350.00
208 Penggantung (Adjustable Hanger Clip) Rp 7,200.00
209 Pengikat (Suspension Rod) 3mmx2400 mm Rp 2,500.00
210 Braket Sudut (angle Braket) Rp 102,300.00
211 Rabung Atap Bitumen Tile Rp 74,000.00
212 Rabung Atap Bitumen Gelombang Rp 26,350.00
213 Rabung Atap Zincalume Rp 2,900.00
214 Ramset Rp 53,550.00
215 Roof light fiberglass uk. 90 x 180 cm Rp 235,000.00
216 Rel Pintu Sorong Rp 8,400.00
217 Residu/ter
218 Refrigerant R41OA (10kg) Rp 2,200,000.00
219 Saklar Tunggal Rp 62,000.00
220 Saklar Ganda Rp 62,000.00
221 Seallent Rp 20,000.00
222 Seal tape Rp 1,000.00
223 Sekrup fisher Rp 250,109.00
N0 NAMA BAHAN HARGA
224 Semen putih @40 Kg Rp 6,252.73
225 Semen putih Rp 92,000.00
226 Semen Portland 50Kg Rp 1,200.00
227 Semen Portland Rp 4,675.00
228 Semen mortar Rp 140,761.00
229 Semen Grout Rp 151,228.00
230 Seng Gelombang bjls 0,20 mm pjng 7 kk Rp 65,000.00
231 Seng Gelombang bjls 0,30 mm pjng 7 kk Rp 190,415.00
232 Seng Plat BJLS 30 Rp 27,202.14
233 Seng Plat BJL30 Rp 18,000.00
234 Smoke Detector Rp 600,000.00
235 Soda Api Rp 525,000.00
236 Sirtu Rp 20,000.00
237 Spring Knip/Grendel Rp 100,000.00
238 Storox - 100 Rp 90,000.00
239 Sticker Sandblast Rp 135,000.00
240 Stop Kontak Dinding Rp 62,000.00
241 Sunscreen Aluminium Rp 150,000.00
242 Tanah Timbun Rp 32,725.00
243 Tali Ijuk Rp 65,000.00
244 Teak Oil Rp 16,500.00
245 Tepung Dempul Rp 71,400.00
246 Teakwood 4 mm uk. 90x220 cm Rp 11,000.00
247 tiner pengencer cat) Rp 105,000.00
248 Tripleks 4 mm Rp 155,000.00
249 Tripleks 6 mm Rp 225,000.00
250 Tripleks 9 mm Rp 650,000.00
251 Tangki Air Rp 175,000.00
252 Test & Commissioning Rp 2,000,000.00
253 UPS 2 Kva Rp 5,000,000.00
254 Ventions Blinds Rp 150,000.00
255 Vertikal blind Rp 61,000.00
256 Vernis Rp 18,000.00
257 Vynil uk. 30 x 30 cm Rp 20,000.00
258 Wallpaper lebar 50 cm Rp 390,000.00
259 Wall Panel UPVC Rangka Hollow Galvanis(Terpasang) Rp 80,000.00
260 Waterstop PVC Lebar 200 mm Rp 95,000.00
261 Waterproofing Sika Rp 55,000.00
262 Waterproofing acian Rp 1,500,000.00
263 Wastafel Rp 1,500,000.00
264 Wastafel setara TOTO Rp 12,500.00
265 Wire mesh Rp 35,000.00
266 Wood Filler Rp 52,000.00
267 Wood stain Rp 45,000.00
268 Sending sealer Rp 45,000.00
N0 NAMA BAHAN HARGA
269 Pintu KM/WC PVC lengkap terpasang Rp 391,650.00
270 Urinoir lengkap Rp 1,700,000.00
271 Septictank cap.3 mᶟ komplet peresapan siap terpasang Rp 3,500,000.00
272 Kaca tebal 5 mm Rp 134,365.00
273 Atap bitumen type single Rp 165,000.00
274 Paku untuk atap bitumen Rp 84,200.00
275 Lem bitustic Rp 114,600.00
276 Underlayer Rp 77,000.00
277 Conblok Rp 2,200.00
278 Marmer uk. 100 x 100 cm Rp 650,000.00
279 Paku uk. 12 cm Rp 18,000.00
Alat/Bahan Pendukung
1 Amplas Rp 7,000.00
2 Kuas Rp 27,225.00
3 Sewa alat pemadatan Stamper Rp 200,000.00
4 Sewa alat las listrik Rp 85,000.00
5 Sewa Hammer 1-2 Ton manual Rp 75,000.00
6 Sewa alat Crane Truck 10 ton Rp 150,000.00
7 Concrete Mixer Rp 76,000.00
Concrete Vibrator Rp 70,000.00
Bahan-bahan Minyak
1 Bensin premium Rp 7,000.00
2 Minyak Pelumas/ Silinder Rp 50,000.00
3 Minyak Gemuk Rp 50,000.00
4 Minyak Solar Rp 6,500.00
5 Kerosene Rp 10,000.00
6 Minyak bekesting Rp 29,000.00
7 Minyak Gerdang Rp 40,500.00
8 Teak Oil Rp 65,000.00
UAN UPAH DAN HARGA SATUAN BAHAN
ERMUKIMAN DAN PENATAAN RUANG KOTA MEDAN
SATUAN
Hari
Hari
Hari
Hari
Hari
Hari
Ltr
lbr
bh
Kaki
bh
m'
btg
bh
m2
m2
M3
M3
M3
Kg
m3
m3
Kg
m3
Kg
M3
Kg
Kg
Kg
Kg
Kg
Kg
Kg
m'
m'
Bh
m'
Kg
Lbr
Kg
Kg
Kg
SATUAN
Kg
Kg
Kg
Kg
Kg
bh
bh
bh
bh
bh
bh
bh
Unit
bh
paket
m2
Batang
mtr
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
kg
m'
lbr
lbr
bh
Lembar
bh
Psg
Bh
Bh
m3
Bh
bh
M2
m2
m2
m2
SATUAN
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
SATUAN
M3
M3
M3
Kg
kg
m'
Lbr
kg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Lbr
m2
Bh
Bh
Bh
Bh
Bh
Bh
Set
Bh
Bh
Kg
Kg
mtr
mtr
Bh
Liter
Liter
lbr
Bh
Bh
Kg
Kg
kg
bh
bh
bh
Kg
bh
Kg
SATUAN
bh
Lembar
m2
m2
m3
Kg
M3
m2
m2
m2
m'
m2
m2
Liter
m2
Kg
m'
m'
m'
m'
m'
m'
m'
mtr
mtr
mtr
m2
m2
m2
btg
btg
btg
bh
bh
bh
lbr
lbr
bh
bh
lbr
Set
Liter
tube
bh
bh
Zak
SATUAN
Kg
Zak
Kg
Kg
Kg
Lbr
Lbr
Lbr
kaki
Kg
m3
Bh
Kg
m2
m2
m3
kg
Liter
Kg
Lembar
kg
Lembar
Lembar
Lembar
Bh
m2
m2
Liter
bh
m'
m2
m'
m2
m2
bh
bh
kg
kg
kg
kg
kg
SATUAN
set
bh
set
m2
m2
dus
tube
m2
bh
bh
bh
Lbr
bh
Hari
Jam
Hari
Jam
Jam
Jam
ltr
ltr
ltr
ltr
ltr
ltr
ltr
ltr