1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lapangan dan Perataan A. 2.2.1.9. 78.00 m2 20,000.00 1,560,000.00
2 Pek. Bowplank A. 2.2.1.4. 56.00 m 68,000.00 3,808,000.00
3 Pek.Langsiran - 1.00 ls 3,000,000.00 3,000,000.00
Sub. Jumlah 8,368,000.00
II PEKERJAAN BONGKARAN
1 Pek. Menurunkan Atap Genteng ABK.990.07 129.36 m2 1,900.00 245,790.01
2 Pek. Bongkar Rangka Atap ABK.990.09 129.36 m2 6.000,00 776.178.98
3 Pek. Bongkar Kuda Kuda ABK.990.12 1.29 m3 776.178,98
75,000.00 96,379.20
4 Pek. Bongkar Rangka Plafon ABK.990.09 104.00 m2 6,000.00 624,000.00
5 Pek. Bongkar Lisplank ABK.990.09 14.32 m2 6,000.00 85,912.24
6 Pek. Bongkar Lantai Kramik ABK.990.05 105.00 m2 6,400.00 672,000.00
7 Pek. Bongkaran Dinding Bangunan - 20.52 m3 120,000.00 2,462,625.00
8 Bongkaran Jendala dan Pintu lama - 0.70 m3 120.000,00 84,240.00
9 Bongkaran Bangunan Wc Lama - 4.50 m3 120.000,00 540,000.00
120.000,01
Sub. Jumlah 5,587,125.44
II PEKERJAAN KAMAR Uk 3,3 x 5,5 m
I PEKERJAAN PONDASI
1 Pek.Galian Rolag tinggi 25 cm A.2.3.1.1. 3.24 m3 65,000.00 210,600.00
2 Pek. Pasangan Pondasi Bata Rolag 40 cm A.4.4.1.9 25.92 m2 130,000.00 3,369,600.00
3 Pek.Urugan Sirtu Padat t = 5 cm A.2.3.1.14. 1.30 m3 250,000.00 324,000.00
Sub. Jumlah 3,904,200.00
I PEKERJAAN PEMBESIAN
V 1 Pek. Kolom 15 x 15 ( 10 unit ) -
Tulangan Pokok 4 dia.8 A.4.1.1.17 41.03 kg 18,000.00 738,616.32
Tulangan Sengkang dia.6 - 200 cm A.4.1.1.17 13.85 kg 18,000.00 249,283.01
Beksiting asumsi 2x pakai A.4.1.1.21 1.95 m2 75,000.00 146,250.00
Pek.Cor Beton ad 1:2:3 ABK.300.19 0.59 m3 950,000.00 555,750.00
2 Pek. Balok 15 x 20 ( keliling luar ) -
Tulangan Pokok 4 dia.8 A.4.1.1.17 79.86 kg 18,000.00 1,437,460.99
Tulangan Sengkang dia.6 - 200 cm A.4.1.1.17 32.57 kg 18,000.00 586,214.56
Beksiting asumsi 2x pakai A.4.1.1.21 10.12 m2 75,000.00 759,000.00
Pek.Cor Beton ad 1:2:3 ABK.300.19 1.52 m3 950,000.00 1,442,100.00
Sub. Jumlah 5,914,674.88
I PEKERJAAN PENGECATAN
X 1 Pek. Cat Lisplang A.4.7.1.4. 9.81 m2 35,000.00 343,448.12
2 Pek. Cat Tembok A.4.7.1.10. 260.99 m2 25,000.00 6,524,750.00
Sub. Jumlah 6,868,198.12
X PEKERJAAN KERAMIK LANTAI DAN TERAS
1 Pek.Urugan Sirtu 3 cm A.2.3.1.14. 3.62 m3 250,000.00 905,850.00
2 Pek.Keramik 40 x 40 (+ teras 60 cm) - 104.49 m2 120,000.00 12,538,800.00
3 Pek Keramik Kasar 25 x 25 u/ wc - 7.56 m2 150,000.00 1,134,000.00
5 Pek.Keramik Dinding 25 x 40 u/ wc ( tinggi 80cm) - 5.76 m2 120,000.00 691,200.00
Sub. Jumlah 15,269,850.00
X PEKERJAAN ELEKTRIKAL 6
I 1 Pek. Instalasi Lampu dan Stop Kontak - 48.00 titik 50,000.00 2,400,000.00
2 Pek. Stop Kontak ( 3titik / kamar ) - 18.00 bh 37,000.00 666,000.00
3 Pek. Lampu SL 18 Watt + Fitting ( 5titik / kamar ) - 30.00 bh 65,000.00 1,950,000.00
4 Pek. Saklar Ganda - 6.00 bh 60,000.00 360,000.00
5 Pek. Saklar Tunggal ( 3titik/ kamar ) - 18.00 bh 55,000.00 990,000.00
6 Pemasangan Baru Listrik 900 watt/SLO/NIDI 1 bh 1,500,000 1,500,000
Sub. Jumlah 7,866,000.00