Anda di halaman 1dari 48

MENU UTAMA

R.A.B MANDIRI SEMI OTO

UNTUK TENDER GEDUNG SKALA KECI

17 LANGKAH MENGERJAKAN SURAT PENAWARAN DAN RAB UNTUK TENDER GEDUN

KERJAKAN SESUAI URUTAN LANGKAH-LANGKAH DI BAW

1. ISI FORM ID

2. MENGERJAKAN BILL OF QUANTITY (ISI JENIS PEKERJAAN VOLUME D


OF QUANTITY BELUM JADI
3. MENGISI KODE BAHAN DAN TENAGA

4. PRINT KODE BAHAN DAN TENAGA UNTUK DILIHAT SAAT MENGETIK

5. MENGERJAKAN ANALISA HARGA SATUAN (ISI KODE BAHAN/ NAMA K


JUGA FORM ISIAN LAINNYA YG DIPERLUKAN) --> ANALISA JADI
6. ISI HARGA SATUAN BAHAN --> HARGA SATUAN BAHAN JADI

7. MENGERJAKAN BILL OF QUANTITY (ISI KODE ANALISA / HARGA MAN


QUANTITY JADI

8. MENGERJAKAN SCHEDULE ( ISI JANGKA WAKTU PELAKSANAAN DAN PEM


JADWAL TIAP ITEM PEKERJAAN :MULAI MINGGU KE BERAPA & BERAPA MING
JIKA MENGIKUTI JADWAL OTOMATIS)

9. MENGATUR KURVA S (TEMPATKAN KURSOR PADA AREA KURVA LALU


DATA DAN PASTIKAN DATA BERISIKAN (='SCHEDULE JADI'!$F$232:$M
PELAKSANAAN 8 MINGGU, (='SCHEDULE JADI'!$F$232:$O$232) JIKA
MINGGU, (='SCHEDULE JADI'!$F$232:$Q$232) JIKA WAKTU PELAKSAN
(='SCHEDULE JADI'!$F$232:$U$232 )JIKA WAKTU PELAKSANAAN 16 M
KOLOM-KOLOM YG TIDAK TERPAKAI--> SCHEDULE JADI
10. MENGERJAKAN SURAT PENAWARAN --> SURAT PENAWARAN JADI
11. MENGISI DATA PERSONIL --> PERSONIL JADI

12. MENGISI DATA PERALATAN UTAMA --> DATA PERALATAN UTAMA J

13. MENGERJAKAN METODE PELAKSANAAN --> METODE PELAKSANA


14. TKDN JADI

15. INSERT KOP, TTD & STEMPEL DIREKTUR LALU ATUR BATAS AREA P
(TAB HIJAU)

15. INSERT KOP, TTD & STEMPEL DIREKTUR LALU ATUR BATAS AREA P
(TAB HIJAU)
16. SILAHKAN HIDE SHEETUNTUK TAB WARNA KUNING (SILAHKAN ME
YG TIDAK ADA KATA 'JADI')
17. TERAKHIR SILAHKAN HIDE SHEET MENU KEMUDIAN SAVE AS PDF
WORKBOOK)

UTAMA
SEMI OTOMATIS

DUNG SKALA KECIL

B UNTUK TENDER GEDUNG SKALA KECIL :

NGKAH-LANGKAH DI BAWAH INI !

EKERJAAN VOLUME DAN SATUANNYA) --> BILL

HAT SAAT MENGETIK KODE BAHAN DAN TENAGA

KODE BAHAN/ NAMA KEBUTUHAN DAN INDEX


ANALISA JADI

AN BAHAN JADI

NALISA / HARGA MANUAL) --> BILL OF

ELAKSANAAN DAN PEMELIHARAAN KEMUDIAN ISI


BERAPA & BERAPA MINGGU. ATAU BIARKAN KOSONG

DA AREA KURVA LALU KLIK KANAN PILIH SELECT


ULE JADI'!$F$232:$M$232) JIKA WAKTU
F$232:$O$232) JIKA WAKTU PELAKSANAAN 10
KA WAKTU PELAKSANAAN 12 MINGGU DAN
U PELAKSANAAN 16 MINGGU), KEMUDIAN HIDE
LE JADI

AT PENAWARAN JADI

PERALATAN UTAMA JADI

METODE PELAKSANAAN JADI

U ATUR BATAS AREA PRINT UNTUK YG 'JADI' SAJA

U ATUR BATAS AREA PRINT UNTUK YG 'JADI' SAJA

UNING (SILAHKAN MENUJU LINK MENU DI ATAS

MUDIAN SAVE AS PDF (OPTION: ENTIRE

SILAHKAN DIISI KOTAK YG BERWARNA

FORM DI BAWAH INI DIISI SEBELUM ANDA MENGERJAKAN RA


: Namakota/kabupaten, 04 Oktob
1 TANGGAL
2 NAMA CV

: CV. ORIGINAL MITRA TEKNIK

3 NAMA DIREKTUR

: DIO A. HEMAWAN, ST

4 ALAMAT

: Jl. Diponegoro No. 17 Namakot

5 NO TELP

: 08111111111

6 NAMA PROGRAM

: PENDIDIKAN MENENGAH

7 NAMA KEGIATAN

: Perencanaan Teknis Pembangu

8 SUMBER DANA

: APBD

9 TAHUN ANGGARAN

: 2014

10 LOKASI

: SMPN I SUKAMAJU KECAMAT


Kab. Namakota/kabupaten

11

NAMA PEKERJAAN

: PEMBANGUNAN RUANG KELA

12 JANGKA WAKTU PELAKSANAAN

75

13 JANGKA WAKTU PEMELIHARAAN

180

FORM DI BAWAH INI DIISI SETELAH ANDA SELESAI


MENGERJAKAN RAB MANDIRI ANDA
: Rp
14 HPS
600,000,000.00
15 PENAWARAN ANDA

: Rp

16 PENAWARAN ANDA TURUN

584,761,000.00

2.540

17 PENAWARAN ANDA DIBUAT TURUN :


- Simpan dengan SAVE AS agar file RAB MSO MASTER Anda tetap dalam keadaan kosong untuk digunakan mengerjakan
- Jika dalam menyimpan muncul pop up (kotak dialog) klik OK

- Kadang terjadi dalam menyimpan butuh proses agak lama, harap tunggu hingga proses penyimpanan selesai
- Jika pekerjaan RAB Anda sudah selesai harap di hide baris-baris atau kolom-kolom yang tidak digunakan
- Hal-hal lainnya bisa Anda sesuaikan sendiri

M ANDA MENGERJAKAN RAB MANDIRI ANDA


amakota/kabupaten, 04 Oktober 2014

V. ORIGINAL MITRA TEKNIK

O A. HEMAWAN, ST
Diponegoro No. 17 Namakota/kabupaten, Namapropinsi

8111111111

ENDIDIKAN MENENGAH

erencanaan Teknis Pembangunan Ruang Kelas

PBD

014

MPN I SUKAMAJU KECAMATAN SUKAJAYA


ab. Namakota/kabupaten

EMBANGUNAN RUANG KELAS


HARI

ATAU

MINGGU

HARI

AH ANDA SELESAI
DIRI ANDA
p
600,000,000.00

10

584,761,000.00

KEMBALI
KE MENU
UTAMA

%
%

eadaan kosong untuk digunakan mengerjakan RAB lainnya

ngga proses penyimpanan selesai


m-kolom yang tidak digunakan

KOP

Nomor
Lampiran

: 002/OMT/IX/2014
: 1 ( Satu ) Berkas.

Namakota/kabupaten, 04 Oktober 2014

Kepada Yth :
Kelompok Kerja I
ULP Kabupaten Kota
diNAMAKAB U PAT E N

Perihal

: Penawaran Pekerjaan PEMBANGUNAN RUANG KELAS

Sehubungan dengan pengumuman Pemilihan Langsung dengan Pascakualifikasi dan Dokumen


Pengadaan nomor: 050/260.XVIII.1/POKJA-I/ULP-BJN/VIII/2014 tanggal 25 September 2014 dan setelah kam
pelajari dengan saksama Dokumen Pengadaan dan Berita Acara Pemberian Penjelasan [serta adendum
Dokumen Pengadaan], dengan ini kami mengajukan penawaran untuk pekerjaan :
PEMBANGUNAN RUANG KELAS

Rp

sebesar :

584,761,000.00

#VALUE!

Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen
Pengadaan untuk melaksanakan pekerjaan tersebut.

Penawaran ini berlaku sejak batas akhir pemasukan Dokumen Penawaran sampai dengan tanggal 01 Nopember
2014.
Sesuai dengan persyaratan, bersama Surat Penawaran ini kami lampirkan :
1. Daftar Kuantitas dan Harga
2. Dokumen penawaran teknis terdiri dari :
a. Metode Pelaksanaan;
b. Jadwal Waktu Pelaksanaan;
c. Daftar Personil Inti;
d. Jenis, kapasitas, komposisi, dan jumlah peralatan utama minimal yang dibutuhkan;
e. Spesifikasi Teknis
3. Formulir rekapitulasi perhitungan Tingkat Komponen Dalam Negeri (TKDN)
Isian Pra RK3K
4. Hasil Pemindaian (scan Sertifikast Keterampilan (SKT) bagi Penanggungjawan Teknis (PJT)

Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada
semua ketentuan yang tercantum dalam Dokumen Pengadaan.

CV. ORIGINAL MITRA TEKNIK

DIO A. HEMAWAN, ST
Direktur

KOP

Namakota/kabupaten, 04 Oktober 2014

PEMBANGUNAN RUANG KELAS

n pengumuman Pemilihan Langsung dengan Pascakualifikasi dan Dokumen


1/POKJA-I/ULP-BJN/VIII/2014 tanggal 25 September 2014 dan setelah kami
men Pengadaan dan Berita Acara Pemberian Penjelasan [serta adendum
kami mengajukan penawaran untuk pekerjaan :
PEMBANGUNAN RUANG KELAS

memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen


ekerjaan tersebut.
akhir pemasukan Dokumen Penawaran sampai dengan tanggal 01 Nopember

an, bersama Surat Penawaran ini kami lampirkan :

n Sertifikast Keterampilan (SKT) bagi Penanggungjawan Teknis (PJT)

Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada
dalam Dokumen Pengadaan.

CV. ORIGINAL MITRA TEKNIK

DIO A. HEMAWAN, ST
Direktur

REKAPITULASI
BILL OF QUANTITY
Nama Program
Nama Kegiatan
Jenis Pekerjaan

:
:
:

PENDIDIKAN MENENGAH
Perencanaan Teknis Pembangunan Ruang Kelas
PEMBANGUNAN RUANG KELAS

Sumber Dana
Tahun Anggaran
Lokasi

:
:
:

APBD
2014
SMPN I SUKAMAJU KECAMATAN SUKAJAYA
Kab. Namakota/kabupaten

NO.
A
I
II
B
I
II
III
IV
V
VI
VII
C
I
II
D
I
E

JENIS PEKERJAAN
PEKERJAAN PERSIAPAN DAN TANAH
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN STRUKTUR
PEKERJAAN PONDASI STRUKTUR
PEKERJAAN BETON STRUKTUR
PEKERJAAN PEMBESIAN
PEKERJAAN BEGESTING
PEKERJAAN DINDING
PEKERJAAN RANGKA ATAP
PEKERJAAN KUSEN, PINTU, JENDELA & BV
PEKERJAAN ARSITEKTUR
PEKERJAAN KERAMIK
PEKERJAAN CAT
PEKERJAAN M/E
PEKERJAAN ELEKTRIKAL
PEKERJAAN TANGGA BETON
JUMLAH
PPN 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang :
#VALUE!

HARGA SATUAN
Rp
Rp

1,950,000.00
2,928,076.80

Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,757,531.31
90,520,031.92
126,461,639.18
59,451,871.89
49,678,411.30
90,892,787.77
34,947,284.43

Rp
Rp

41,089,120.66
14,991,354.65

Rp
Rp

8,927,190.00
6,005,669.12

Rp
Rp
Rp
Rp

531,600,969.03
53,160,096.90
584,761,065.93
584,761,000.00

BILL OF QUANTITY
NAMA PROGRAM

PENDIDIKAN MENENGAH

NAMA KEGIATAN

Perencanaan Teknis Pembangunan Ruang Kelas

TAHUN ANGGARAH

2014

LOKASI

SMPN I SUKAMAJU KECAMATAN SUKAJAYA

PERINCIAN SUB PEKERJAAN

NO

JENIS PEKERJAAN

VOLUME

HARGA SATUAN

JUMLAH HARGA

(1)

(2)

(3)

(4)

(5)

PEKERJAAN PERSIAPAN DAN TANAH

PEKERJAAN PERSIAPAN

Pembersihan Lokasi

1.000

Ls

Rp

300,000.00

Rp

300,000.00#

Pembongkaran Atap

1.000

Ls

Rp

1,250,000.00

Rp

1,250,000.00#

Papan Nama Proyek

1.000

Ls

Rp

400,000.00

Rp

400,000.00#

JUMLAH

Rp

1,950,000.00

II

PEKERJAAN TANAH

Galian Tanah Pondasi Poer

41.280

m3

Rp

43,175.00

Rp

1,782,264.00

Bongkar dan Galian Sloof Lama

20.640

m3

Rp

43,175.00

Rp

891,132.00

Urugan Pasir Bawah Poer, tebal 5 cm

2.640

m3

Rp

96,470.00

Rp

254,680.80

JUMLAH

Rp

2,928,076.80

48,683.25

Rp

2,726,262.00

PEKERJAAN STRUKTUR

PEKERJAAN PONDASI STRUKTUR

Pengeboran Strauss pile Dia 25 cm - 300 Cm

56.000

Pengeboran Strauss pile Dia 25 cm - 200 Cm

Lantai Rabbat Beton Mutu B0, tebal 5 cm

II

PEKERJAAN BETON STRUKTUR

ttk

Rp

5.000

ttk

Rp

32,455.50

Rp

162,277.50

1.110

m3

Rp

782,875.50

Rp

868,991.81

JUMLAH

Rp

3,757,531.31

9,943,038.34

LANTAI I
1

Beton Strauss pile 30-3.00 m, K 175 Kg/Cm2

10.880

m3

Rp

913,882.20

Rp

Beton Strauss pile 30-1.50 m, K 175 Kg/Cm2

0.530

m3

Rp

913,882.20

Rp

484,357.57

Beton Poer Besar 0,60 x 1,40 x 0,20 m, K.175 Kg/cm2

7.060

m3

Rp

913,882.20

Rp

6,452,008.33

Beton Poer Kecil 0,60 x 0,60 x 0,20 m, K.175 Kg/cm2

0.540

m3

Rp

913,882.20

Rp

493,496.39

Beton Sloof Penyambungan S1, 20x40 cm, K 175 Kg/cm2

2.240

m3

Rp

913,882.20

Rp

2,047,096.13

Beton Sloof Teras S2, 15x20 cm, K 175 Kg/cm2

1.200

m3

Rp

913,882.20

Rp

1,096,658.64

Beton Kolom Baru Struktur K1 15x40 cm, K 175 Kg/cm2

6.300

m3

Rp

913,882.20

Rp

5,757,457.86

Beton Kolom Tambahan 15x10 cm, K 175 Kg/cm2

1.580

m3

Rp

913,882.20

Rp

1,443,933.88

Beton Balok Struktur B1 25x50 cm, K 175 Kg/cm2

6.000

m3

Rp

913,882.20

Rp

5,483,293.20

10

Beton Balok Struktur B2 20x45 cm, K 175 Kg/cm2

14.220

m3

Rp

913,882.20

Rp

12,995,404.88

11

Beton Balok Struktur B3 15x20 cm, K 175 Kg/cm2

0.810

m3

Rp

913,882.20

Rp

740,244.58

12

Beton Struktur Listplank 10x40 cm, K.175 Kg/cm2

13

Beton Struktur Plat Lantai tebal 12 cm, K.175 Kg/cm2

14

Beton Balok Latai, 12x15 cm, K.175 Kg/cm2

1.220

m3

Rp

913,882.20

Rp

1,114,936.28

31.750

m3

Rp

913,882.20

Rp

29,015,759.85

1.540

m3

Rp

913,882.20

Rp

1,407,378.59

LANTAI II
1

Beton Kolom Baru Struktur K1 20x30 cm, K 175 Kg/cm2

6.300

m3

Rp

913,882.20

Rp

5,757,457.86

Beton Balok Latai, 12x15 cm, K 175 Kg/cm2

1.540

m3

Rp

913,882.20

Rp

1,407,378.59

Beton Ring Balok, 15x20 cm, K 175 Kg/cm2

2.560

m3

Rp

913,882.20

Rp

2,339,538.43

Beton Konsol dan Gewel, 15x20 cm, K 175 Kg/cm2

2.780

m3

Rp

913,882.20

Rp

2,540,592.52

JUMLAH

Rp

90,520,031.92

NO
III

JENIS PEKERJAAN

VOLUME

HARGA SATUAN

JUMLAH HARGA

PEKERJAAN PEMBESIAN
LANTAI I

Beton Strauss pile 30-3.00 m

318.148

Kg

Rp

16,253.88

Rp

5,171,139.41

Beton Strauss pile 30-1.50 m

15.494

Kg

Rp

16,253.88

Rp

251,837.62

Beton Poer Besar

595.015

Kg

Rp

16,253.88

Rp

9,671,302.41

Beton Poer Kecil

32.256

Kg

Rp

16,253.88

Rp

524,285.15

Beton Sloof Penyambungan S1

157.791

Kg

Rp

16,253.88

Rp

2,564,715.98

Beton Sloof S2

90.953

Kg

Rp

16,253.88

Rp

1,478,339.15

Beton Kolom Baru Struktur K1

631.130

Kg

Rp

16,253.88 Rp

10,258,311.28

Beton Kolom Tambahan

286.700

Kg

Rp

16,253.88

Rp

4,659,987.40

Beton Balok Struktur B1

829.570

Kg

Rp

16,253.88

Rp

13,483,731.23

10

Beton Balok Struktur B2

1,171.340

Kg

Rp

16,253.88

Rp

19,038,819.80

11

Beton Balok Struktur B3

103.110

Kg

Rp

16,253.88

Rp

1,675,937.57

12

Beton Struktur Listplank

13

Beton Struktur Plat Lantai

14

Beton Balok Latai

79.630

Kg

Rp

16,253.88

Rp

1,294,296.46

2,113.170

Kg

Rp

16,253.88 Rp

34,347,211.60

154.230

Kg

Rp

16,253.88

Rp

2,506,835.91

10,258,311.28

LANTAI II
1

Beton Kolom Baru Struktur K1

631.130

m3

Rp

16,253.88 Rp

Beton Balok Latai

175.000

m3

Rp

16,253.88

Rp

2,844,429.00

Beton Ring Balok

238.160

m3

Rp

16,253.88

Rp

3,871,024.06

Beton Konsol dan Gewel

157.570

Kg

Rp

16,253.88

Rp

2,561,123.87

JUMLAH

Rp

126,461,639.18

IV

PEKERJAAN BEGESTING
LANTAI I

Beton Poer Besar 0,60 x 1,40 x 0,20

56.000

m2

Rp

119,501.25

Rp

6,692,070.00

Beton Poer Kecil 0,60 x 0,60 x 0,20

12.000

m2

Rp

119,501.25

Rp

1,434,015.00

Beton Sloof Penyambungan S1, 20x40 cm

22.400

m2

Rp

119,501.25

Rp

2,676,828.00

Beton Sloof Teras S2, 15x20 cm

Beton Kolom Baru Struktur K1 15x40 cm

6
7

2.000

m2

Rp

119,501.25

Rp

239,002.50

19.600

m2

Rp

119,501.25

Rp

2,342,224.50

Beton Kolom Tambahan 15x10 cm

5.600

m2

Rp

119,501.25

Rp

669,207.00

Beton Balok Struktur B1 25x50 cm

36.000

m2

Rp

119,501.25

Rp

4,302,045.00

Beton Balok Struktur B2 20x45 cm

75.600

m2

Rp

119,501.25

Rp

9,034,294.50
1,451,940.19

Beton Balok Struktur B3 15x20 cm

12.150

m2

Rp

119,501.25

Rp

10

Beton Struktur Listplank 10x40 cm

12.240

m2

Rp

119,501.25

Rp

1,462,695.30

11

Beton Struktur Plat Lantai tebal 12 cm

128.510

m2

Rp

119,501.25

Rp

15,357,105.64

12

Beton Balok Latai, 12x15 cm

17.080

m2

Rp

119,501.25

Rp

2,041,081.35

LANTAI II
1

Beton Kolom Baru Struktur K1 20x30 cm

18.670

m2

Rp

119,501.25

Rp

2,231,088.34

Beton Balok Latai, 12x15 cm

25.620

m2

Rp

119,501.25

Rp

3,061,622.03

Beton Ring Balok, 15x20 cm

17.080

m2

Rp

119,501.25

Rp

2,041,081.35

Beton Konsol dan Gewel, 15x20 cm

36.950

m2

Rp

119,501.25

Rp

4,415,571.19

JUMLAH

Rp

59,451,871.89

PEKERJAAN DINDING

Pasang Dinding Bata 1Pc : 6Ps Tambahan 50 cm Lantai I

Pasang Dinding Bata 1Pc : 6Ps Lantai II + Gewel

Pasang Dinding Bata Trasram 1Pc : 3Ps Lantai I + II

Plesteran Dinding Trasram 1Pc : 3Ps Lantai II

Plesteran Dinding 1Pc : 6Ps Lantai I + II

Pasangan Bata Berongga

Benangan Sudut Dinding dan Kolom

34.160

m2

Rp

94,651.70

Rp

3,233,302.07

231.810

m2

Rp

94,651.70

Rp

21,941,210.58

15.730

m2

Rp

102,472.70

Rp

1,611,895.57

31.460

m2

Rp

43,824.11

Rp

1,378,706.50

522.830

m2

Rp

39,318.51

Rp

20,556,896.58

2.000

Unit

Rp

200,000.00

Rp

400,000.00#

222.560

m1

Rp

2,500.00

Rp

556,400.00#

NO

JENIS PEKERJAAN

VOLUME

HARGA SATUAN
JUMLAH Rp

JUMLAH HARGA
49,678,411.30

NO

JENIS PEKERJAAN

VOLUME

HARGA SATUAN

JUMLAH HARGA

VI

PEKERJAAN RANGKA ATAP

Pasang Kuda-2 kayu bangkirai, 6x12 cm (kelas II)

0.780

m3

Rp

9,980,080.00

Rp

7,784,462.40

Pasang Kuda-2 kayu bahan lama

0.780

m3

Rp

1,510,080.00

Rp

1,177,862.40

Pasang Nok gording kayu bangkirai , 6x12 cm (kelas II)

0.778

m3

Rp

10,741,087.50

Rp

8,356,566.08

Pasang Nok gording kayu bahan lama

0.778

m3

Rp

2,271,087.50

Rp

1,766,906.08

Pasang Usuk dan Reng kayu Kruing

109.890

m2

Rp

368,472.50

Rp

40,491,443.03

Pasang Usuk dan Reng kayu bahan lama

187.110

m2

Rp

17,352.50

Rp

3,246,826.28

Pasang Papan Reuter

5.800

m2

Rp

350,000.00

Rp

2,030,000.00#

Pasang Listplank Woodplank

76.000

m1

Rp

65,450.00

Rp

4,974,200.00

Pasang Papan Kompres

22.000

m1

Rp

72,957.50

Rp

1,605,065.00

10

Pasang Genteng Beton

297.000

m2

Rp

56,391.50

Rp

16,748,275.50

11

Pasang Bubungan Genteng Beton

29.000

m1

Rp

93,489.00

Rp

2,711,181.00

JUMLAH

Rp

90,892,787.77

Rp

6,705,466.03 Rp

20,116,398.09
10,143,880.02

VII

PEKERJAAN KUSEN, PINTU, JENDELA & BV

Kusen Alumunium Colour P2

3.000

Unit

Kusen Alumunium Colour J2

9.000

Unit

Rp

1,127,097.78

Rp

Kusen Alumunium Colour J3

6.000

Unit

Rp

781,167.72

Rp

4,687,006.32

JUMLAH

Rp

34,947,284.43

PEKERJAAN ARSITEKTUR

PEKERJAAN KERAMIK

Pasang Keramik Lantai 40x40 Cm Dalam Gedung + Baduk

2
3
4

Pasang Keramik Sudut

II

PEKERJAAN CAT

Cat Dinding Exterior (Weathershield)

138.570

m2

Cat Dinding Interior

421.140

m2

208.420

m2

Rp

147,899.63

Rp

30,825,241.09

Pasang Keramik Lantai 30x30 Cm Lantai I

20.000

m2

Rp

148,513.75

Rp

2,970,275.00

Pasang Keramik Lantai 40x40 Cm Teras Warna

48.600

m2

Rp

147,899.63

Rp

7,187,922.07

4.500

m1

Rp

23,485.00

Rp

105,682.50

JUMLAH

Rp

41,089,120.66

Rp

45,903.28

Rp

6,360,816.82

Rp

20,493.28

Rp

8,630,537.83

JUMLAH

Rp

14,991,354.65

Rp

145,475.00

Rp

3,782,350.00

PEKERJAAN M/E

PEKERJAAN ELEKTRIKAL

Pasang Instalasi Listrik dan stop kontak

Lampu V Shape Mirror TL 2x18 W/54

9.000

Ttk

Rp

97,900.00

Rp

881,100.00

Pasang Down Light IDL 108/A White + Lampu PLC 82, 18 W

3.000

bh

Rp

74,800.00

Rp

224,400.00

Pasang Saklar Engkel Push On Off Cream A107

8.000

bh

Rp

51,700.00

Rp

413,600.00

Pasang Saklar Seri Push On Off Cream A108

6.000

bh

Rp

57,475.00

Rp

344,850.00

Pasang Stop Kontak 6100/6122, 240

9.000

bh

Rp

55,165.00

Rp

496,485.00

Pasang Presto + MCB MG 2x6 Amp

2.000

bh

Rp

142,202.50

Rp

284,405.00

Penyambungan ke Instalasi Terdekat

1.000

Unit

Rp

2,500,000.00

Rp

2,500,000.00#

JUMLAH

Rp

8,927,190.00

26.000

Ls
E

PEKERJAAN TANGGA BETON

Pasang Dinding Bata 1 Pc : 6 Ps

22.000

Rp

94,651.70

Rp

2,082,337.40

Plesteran Dinding 1 Pc : 6 Ps

44.000

m2

Rp

39,318.51

Rp

1,730,014.44

Plat Beton Tangga Tebal 20 cm ( Termasuk Plat Injak )

2.400

m2

Rp

913,882.20

Rp

2,193,317.28

JUMLAH

Rp

6,005,669.12

JUMLAH TOTAL

Rp

531,600,969.03

m3

ANALISA HARGA SATUAN


NO.

KEBUTUHAN

SATUAN

INDEKS

HARGA BAHAN

UPAH

1 TITIK GALIAN TANAH PENGEBORAN STROUSS PILE 25-3.00 M


Pekerja

org/hari

0.3000 @

Rp

BAHAN

Tukang Batu
Kepala Tukang Batu
Mandor
Alat Bantu

org/hari
org/hari
org/hari
Set

0.0300
0.0030
0.0015
0.3000

@
@
@
@

Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
90,000.00
PROFIT 10%
JUMLAH

1 TITIK GALIAN TANAH PENGEBORAN STROUSS PILE 25-2.00 M


Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Alat Bantu

org/hari
org/hari
org/hari
org/hari
Set

0.2000
0.0200
0.0020
0.0010
0.2000

@
@
@
@
@

2
UPAH

BAHAN

50,000.00

HARGA SATUAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
1,950.00
202.50
105.00
27,000.00
4,425.75
48,683.25

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
90,000.00
PROFIT 10%

Rp.
Rp.
Rp.
Rp.

10,000.00
1,300.00
135.00
70.00

Rp.
Rp.

18,000.00
2,950.50

JUMLAH

Rp.

32,455.50

1 M3 Galian Tanah Biasa < 1 M Manual


UPAH

4
UPAH
BAHAN

5
UPAH

BAHAN

6
UPAH

BAHAN

7
UPAH

BAHAN

Pekerja
Mandor

org/hari
org/hari

0.7500 @
0.0250 @

Rp
50,000.00
Rp
70,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.

37,500.00
1,750.00
3,925.00
43,175.00

1 M3 Urugan Pasir
Pekerja
Mandor
Pasir Urug / Puk

org/hari
org/hari
M3

0.3000 @
0.0100 @
1.2000 @

Rp
Rp
Rp

Rp.

15,000.00

Rp.
Rp.

700.00
72,000.00

PROFIT 10%
JUMLAH

Rp.
Rp.

8,770.00
96,470.00

1 M3 Pembuatan Beton Lantai Kerja


Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Kerikil Beton 1-2 Cm Pecah Mesin
Pasir Cor
Semen Pc
Air

org/hari
org/hari
org/hari
org/hari
M3
M3
Kg
Ltr

1.3200
0.2200
0.0220
0.1320
0.7400
0.6210
247.0000
215.0000

@
@
@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
250,000.00
Rp
130,000.00
Rp
1,350.00
Rp
100.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,000.00
14,300.00
1,485.00
9,240.00
185,000.00
80,730.00
333,450.00
21,500.00
71,170.50
782,875.50

1 M3 Pembuatan Beton K.175 Kg/Cm2


Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Kerikil Beton 1-2 Cm Pecah Mesin
Pasir Cor
Semen Pc
Air

org/hari
org/hari
org/hari
org/hari
M3
M3
Kg
Ltr

1.6500
0.2750
0.0280
0.0830
0.7622
0.5429
326.0000
215.0000

@
@
@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
250,000.00
Rp
130,000.00
Rp
1,350.00
Rp
100.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

82,500.00
17,875.00
1,890.00
5,810.00
190,550.00
70,577.00
440,100.00
21,500.00
83,080.20
913,882.20

10 Kg Pekerjaan Pembesian Polos Dan Ulir


Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
Besi Beton Ulir Dan Polos Sni
Kawat Beton / Bendrat

org/hari
org/hari
org/hari
org/hari
Kg
Kg

0.0700
0.0700
0.0070
0.0070
10.5000
0.1500

@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
13,000.00
Rp
15,000.00
PROFIT 10%
JUMLAH
Rp
162,538.75
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,500.00
4,550.00
472.50
490.00
136,500.00
2,250.00
14,776.25
162,538.75
16,253.88
(0.00)
16,253.88

1 Kg Pekerjaan Pembesian Polos Dan Ulir

9
UPAH

BAHAN

UPAH

BAHAN

0.1000 @

1 M2 Pekerjaan Bekisting Beton Biasa Dg Multipleks 12 Mm (Pemakaian Ke 3)


Pekerja
Tukang Kayu
Kepala Tukang Kayu

org/hari
org/hari
org/hari

0.5000 @
0.2500 @
0.0250 @

Rp
Rp
Rp

50,000.00
65,000.00
67,500.00

Rp.

25,000.00

Rp.
Rp.

16,250.00
1,687.50

Mandor
Multipleks 6 Mm 1,2 X 2,4 M

org/hari
Lbr

0.0500 @
0.2100 @

Rp
Rp

70,000.00
90,000.00

M3
Kg
Ltr

0.0113 @
0.2500 @
0.2000 @

Rp 3,500,000.00
Rp
13,000.00
Rp
2,500.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,500.00
18,900.00
39,550.00
3,250.00
500.00
10,863.75
119,501.25

1 M1 Pekerjaan Pemasangan Kusen Allumunium Coklat


Pekerja
Tukang Aluminium

org/hari
org/hari

0.0430 @
0.0430 @

Rp
Rp

50,000.00
65,000.00

Rp.
Rp.

2,150.00
2,795.00

Kepala Tukang Aluminium


Mandor

org/hari
org/hari

0.0043 @
0.0021 @

Rp
Rp

67,500.00
70,000.00

M1
Bh
Kg

1.1000 @
2.0000 @
0.0600 @

Rp
95,000.00
Rp
2,500.00
Rp
63,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

290.25
147.00
104,500.00
5,000.00
3,780.00
11,866.23
130,528.48

Kayu Usuk Meranti


Paku Biasa Usuk
Oli Bekas

10

50,000.00
70,000.00
60,000.00

Alumunium Casment
Sekrup Fixer Dan Peralatan
Sealent

11

BAHAN

12

1 Unit Pekerjaan Pemasangan Pintu Tipe P2


KUSEN CASEMENT
PASANG PINTU
Kunci Paloma
Engsel Pintu Kuningan Asli
Grendel Jendela Kuningan
Kaca Rayband Tebal 5 Mm
Door Stop

M1
M2
Set
Set
Bh
M2
Bh

5.8000
2.9960
1.0000
6.0000
1.0000
0.4125
2.0000

@
@
@
@
@
@
@

Rp
130,528.48
Rp 1,820,938.63
Rp
150,000.00
Rp
35,000.00
Rp
17,000.00
Rp
85,000.00
Rp
18,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

757,065.16
5,455,532.12
150,000.00
210,000.00
17,000.00
35,062.50
36,000.00
44,806.25

Rp.

6,705,466.03

Rp
Rp

Rp.
Rp.
Rp.
Rp.

994,626.98
120,428.00
12,042.80
1,127,097.78

Rp
130,528.48
Rp
85,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.

665,695.22
104,975.00
10,497.50

Rp.

781,167.72

Rp
Rp

4,250.00
5,525.00
573.75
294.00
389,500.00
1,241,000.00
14,256.00
165,539.88
1,820,938.63

1 Unit Pekerjaan Pemasangan Jendela Tipe J2


BAHAN

KUSEN CASEMENT
Kaca Rayband Tebal 5 Mm

M1
M2

7.6200 @
1.4168 @

130,528.48
85,000.00

PROFIT 10%
JUMLAH
13
BAHAN

14

1 Unit Pekerjaan Pemasangan Jendela Tipe J3


KUSEN CASEMENT
Kaca Rayband Tebal 5 Mm

M1
M2

5.1000 @
1.2350 @

1 M2 Pekerjaan Pemasangan Pintu Alumunium Strip Coklat Lebar 8 Cm


UPAH

Pekerja
Tukang Aluminium

org/hari
org/hari

Kepala Tukang Aluminium


Mandor
Alumunium Casment
Alumunium Strip
Kaca Es

org/hari
org/hari
M1
M1
M2

0.0085
0.0042
4.1000
14.6000
0.1782

@
@
@
@
@

Rp
67,500.00
Rp
70,000.00
Rp
95,000.00
Rp
85,000.00
Rp
80,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1 M2 Pasangan Bata Merah Tebal 1/2 Campuran 1 Pc : 3 Ps


Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Bata Merah
Pasir Pasang
Semen Pc

org/hari
org/hari
org/hari
org/hari
Bh
M3
Kg

0.3000
0.1000
0.0100
0.0150
70.0000
0.0400
14.3200

@
@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
660.00
Rp
110,000.00
Rp
1,350.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
6,500.00
675.00
1,050.00
46,200.00
4,400.00
19,332.00
9,315.70
102,472.70

1 M2 Pasangan Bata Merah Tebal 1 Campuran 1 Pc : 6 Ps


Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Bata Merah
Pasir Pasang
Semen Pc

org/hari
org/hari
org/hari
org/hari
Bh
M3
Kg

0.3000
0.1000
0.0100
0.0150
70.0000
0.0490
8.3200

@
@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
660.00
Rp
110,000.00
Rp
1,350.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
6,500.00
675.00
1,050.00
46,200.00
5,390.00
11,232.00
8,604.70
94,651.70

1 M2 Plesteran Tebal 1,5 Cm Campuran 1 Pc : 3 Ps


Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Pasir Pasang
Semen Pc

org/hari
org/hari
org/hari
org/hari
M3
Kg

0.3000
0.1500
0.0150
0.0150
0.0230
7.7760

@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
110,000.00
Rp
1,350.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
9,750.00
1,012.50
1,050.00
2,530.00
10,497.60
3,984.01
43,824.11

1 M2 Plesteran Tebal 1,5 Cm Campuran 1 Pc : 6 Ps


Pekerja

org/hari

0.3000 @

Rp

50,000.00

Rp.

15,000.00

Tukang Batu
Kepala Tukang Batu

org/hari
org/hari

0.1500 @
0.0150 @

Rp
Rp

65,000.00
67,500.00

BAHAN

Mandor
Pasir Pasang
Semen Pc

org/hari
M3
Kg

0.0150 @
0.0270 @
4.4160 @

Rp
70,000.00
Rp
110,000.00
Rp
1,350.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,750.00
1,012.50
1,050.00
2,970.00
5,961.60
3,574.41
39,318.51

UPAH

1 M2 Pekerjaan Pasangan Keramik 30X30 Cm


Pekerja
Tukang Batu

org/hari
org/hari

0.7000 @
0.3500 @

Rp
Rp

50,000.00
65,000.00

Rp.
Rp.

35,000.00
22,750.00

Kepala Tukang Batu


Mandor

org/hari
org/hari

0.0350 @
0.0350 @

Rp
Rp

67,500.00
70,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,362.50
2,450.00
51,000.00
3,000.00
4,950.00
13,500.00
13,501.25
148,513.75

BAHAN

15
UPAH

BAHAN

16
UPAH

BAHAN

17
UPAH

BAHAN

18
UPAH

19

BAHAN

20
UPAH

BAHAN

Keramik 30X30 Cm Lantai Warna Putih/Motif


Semen Warna
Pasir Pasang
Semen Pc

1 M2 Pekerjaan Pasangan Keramik 40X40 Cm Polos


Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Keramik 40X40 Cm Lantai Warna Putih/Motif
Semen Warna
Pasir Pasang
Semen Pc

0.0850 @
0.0850 @

50,000.00
65,000.00

M2
Kg
M3
Kg

11.8700
1.5000
0.0450
10.0000

@
@
@
@

Rp
4,296.55
Rp
2,000.00
Rp
110,000.00
Rp
1,350.00
PROFIT 10%
JUMLAH

org/hari
org/hari
org/hari
org/hari
M2
Kg

0.7000
0.3500
0.0350
0.0350
6.4740
1.5000

@
@
@
@
@
@

Rp
Rp
Rp
Rp
Rp
Rp

50,000.00
65,000.00
67,500.00
70,000.00
7,791.43
2,000.00

Rp.
Rp.
Rp.
Rp.

35,000.00
22,750.00
2,362.50
2,450.00

Rp.
Rp.

50,441.71
3,000.00

0.0450 @
10.0000 @

Rp
Rp

110,000.00
1,350.00

Rp.
Rp.
Rp.
Rp.

4,950.00
13,500.00
13,445.42
147,899.63

M3
Kg

PROFIT 10%
JUMLAH

21
UPAH

BAHAN

22

1 M1 Pekerjaan Pasangan Keramik Sudut (Kuku Macan)


Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Keramik Sponing (Kuku Macan)
Semen Warna
Semen Pc

org/hari
org/hari
org/hari
org/hari
Bh
Kg
Kg

0.0500
0.0500
0.0050
0.0025
11.0000
0.1000
1.2500

@
@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
1,200.00
Rp
2,000.00
Rp
1,350.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,500.00
3,250.00
337.50
175.00
13,200.00
200.00
1,687.50
2,135.00

Rp.

23,485.00

Rp
Rp

Rp
67,500.00
Rp
70,000.00
Rp
3,000.00
Rp
13,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,000.00
6,500.00
675.00
700.00
33,000.00
390.00
5,126.50
56,391.50

1 M2 Pasang Genteng Beton Polos


UPAH

BAHAN

23
UPAH

BAHAN

24
UPAH

BAHAN

25
UPAH

BAHAN

26
UPAH

BAHAN

27

Pekerja
Tukang Kayu

org/hari
org/hari

0.2000 @
0.1000 @

Kepala Tukang Kayu


Mandor
Genteng Beton
Paku Biasa Usuk

org/hari
org/hari
Bh
Kg

1 M2 Pasang Genteng Bubungan Beton


Pekerja

org/hari

0.4000 @

Rp

50,000.00

Rp.

20,000.00

Tukang Kayu
Kepala Tukang Kayu

org/hari
org/hari

0.2000 @
0.0200 @

Rp
Rp

65,000.00
67,500.00

Mandor
Genteng Bubungan Beton
Pasir Pasang
Semen Pc
Paku Biasa Usuk
Semen Warna

org/hari
Bh
M3
Kg
Kg
Kg

0.0020
3.5000
0.0320
10.8000
0.0500
1.0000

@
@
@
@
@
@

Rp
70,000.00
Rp
8,500.00
Rp
110,000.00
Rp
1,350.00
Rp
13,000.00
Rp
2,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,000.00
1,350.00
140.00
29,750.00
3,520.00
14,580.00
650.00
2,000.00
8,499.00
93,489.00

1 M3 Pekerjaan Pembuatan Dan Pemasangan Kuda-Kuda Kayu Bangkirai


Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Bangkirai Balok
Besi Strip
Paku Biasa Usuk

org/hari
org/hari
org/hari
org/hari
M3
Kg
Kg

4.0000
12.0000
1.2000
0.2000
1.1000
15.0000
5.6000

@
@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp 7,000,000.00
Rp
15,000.00
Rp
13,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

200,000.00
780,000.00
81,000.00
14,000.00
7,700,000.00
225,000.00
72,800.00
907,280.00
9,980,080.00

1 M3 Pekerjaan Pembuatan Dan Pemasangan Kuda-Kuda Kayu Bangkirai Bahan Lama


Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Besi Strip
Paku Biasa Usuk

org/hari
org/hari
org/hari
org/hari
Kg
Kg

4.0000
12.0000
1.2000
0.2000
15.0000
5.6000

@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
15,000.00
Rp
13,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

200,000.00
780,000.00
81,000.00
14,000.00
225,000.00
72,800.00
137,280.00
1,510,080.00

1 M3 Pekerjaan Pembuatan Dan Pemasangan Gording Kayu Bangkirai


Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Kayu Bangkirai Balok
Besi Strip
Paku Biasa Usuk

org/hari
org/hari
org/hari
org/hari
M3
Kg
Kg

6.7000
20.1000
2.0100
0.3350
1.1000
15.0000
3.0000

@
@
@
@
@
@
@

Rp
50,000.00 Rp.
Rp
65,000.00 Rp.
Rp
67,500.00 Rp.
Rp
70,000.00 Rp.
Rp 7,000,000.00 Rp.
Rp
15,000.00 Rp.
Rp
13,000.00 Rp.
Rp.
PROFIT 10%
JUMLAH
Rp.

335,000.00
1,306,500.00
135,675.00
23,450.00
7,700,000.00
225,000.00
39,000.00
976,462.50

0.0100
0.0100
11.0000
0.0300

@
@
@
@

50,000.00
65,000.00

10,741,087.50

1 M3 Pekerjaan Pembuatan Dan Pemasangan Gording Kayu Bahan Lama


UPAH

BAHAN

28
UPAH

BAHAN

29
UPAH

BAHAN

Pekerja
Tukang Kayu

org/hari
org/hari

6.7000 @
20.1000 @

Rp
Rp

Kepala Tukang Kayu


Mandor
Besi Strip
Paku Biasa Usuk

org/hari
org/hari
Kg
Kg

2.0100
0.3350
15.0000
3.0000

Rp
67,500.00
Rp
70,000.00
Rp
15,000.00
Rp
13,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

335,000.00
1,306,500.00
135,675.00
23,450.00
225,000.00
39,000.00
206,462.50
2,271,087.50

1 M2 Pekerjaan Pemasangan Usuk Dan Reng Genteng Glazuur Topaz Natural


Pekerja

org/hari

Tukang Kayu
Kepala Tukang Kayu

org/hari
org/hari

0.1000 @

Rp

50,000.00

Rp.

5,000.00

0.1000 @
0.0100 @

Rp
Rp

65,000.00
67,500.00

org/hari
M3
M3
Kg

0.0050
0.0096
0.0360
0.2500

@
@
@
@

Rp
70,000.00
Rp 7,000,000.00
Rp 7,000,000.00
Rp
13,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
675.00
350.00
67,200.00
252,000.00
3,250.00
33,497.50
368,472.50

Mandor
Kayu Bangkirai Balok
Kayu Bangkirai Balok
Paku Biasa Usuk

1 M2 Pekerjaan Pemasangan Usuk Dan Reng Bahan Lama


Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Paku Biasa Usuk

org/hari
org/hari
org/hari
org/hari
Kg

0.1000
0.1000
0.0100
0.0050
0.2500

@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
13,000.00
PROFIT 10%

Rp.
Rp.
Rp.
Rp.

5,000.00
6,500.00
675.00
350.00

Rp.
Rp.

3,250.00
1,577.50

JUMLAH

Rp.

17,352.50

@
@
@
@

50,000.00
65,000.00

30

1 M1 Pekerjaan Pemasangan Listplank (Woodplank)


Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Wood Plank
Paku Biasa Usuk

org/hari
org/hari
org/hari
org/hari
M1
Kg

0.1000
0.2000
0.0200
0.0050
1.1000
0.1000

1 M1 Pekerjaan Pemasangan Papan Kompres


Pekerja

org/hari

Tukang Kayu
Kepala Tukang Kayu

org/hari
org/hari

BAHAN

Mandor
Kayu Papan
Paku Biasa Usuk

UPAH

UPAH

BAHAN

31
UPAH

32

BAHAN

33
UPAH

BAHAN

34
UPAH

BAHAN

35
UPAH

BAHAN

36
UPAH

BAHAN

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
35,000.00
Rp
13,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,000.00
13,000.00
1,350.00
350.00
38,500.00
1,300.00
5,950.00
65,450.00

0.0500 @

Rp

50,000.00

Rp.

2,500.00

0.1000 @
0.0100 @

Rp
Rp

65,000.00
67,500.00

org/hari
M1
Kg

0.0050 @
1.1000 @
0.1000 @

Rp
70,000.00
Rp
50,000.00
Rp
13,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
675.00
350.00
55,000.00
1,300.00
6,632.50
72,957.50

1 Bh Pekerjaan Pemasangan Engsel Pintu 4"


Pekerja
Tukang Kayu

org/hari
org/hari

0.0150 @
0.1500 @

Rp
Rp

50,000.00
65,000.00

Rp.
Rp.

750.00
9,750.00

Kepala Tukang Kayu


Mandor

org/hari
org/hari

0.0150 @
0.0008 @

Rp
Rp

67,500.00
70,000.00

Set

1.0000 @

Rp
35,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.

1,012.50
56.00
35,000.00
4,656.85
51,225.35

Engsel Pintu Kuningan Asli

@
@
@
@
@
@

1 M2 Pekerjaan Pengecatan Dinding Interior


Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Plamir Tembok
Cat Dasar/Penutup Dinding Interior
Cat Dasar/Penutup Dinding Interior

org/hari
org/hari
org/hari
org/hari
Kg
Kg
Kg

0.0200
0.0630
0.0063
0.0030
0.1000
0.1000
0.2600

@
@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
21,000.00
Rp
30,000.00
Rp
30,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,000.00
4,095.00
425.25
210.00
2,100.00
3,000.00
7,800.00
1,863.03
20,493.28

1 M2 Pekerjaan Pengecatan Dinding Exterior (Weathershield)


Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor
Cat Dasar/Penutup Weathershield/Eksterior
Cat Dasar/Penutup Weathershield/Eksterior

org/hari
org/hari
org/hari
org/hari
Kg
Kg

0.0200
0.0630
0.0063
0.0030
0.1000
0.2600

@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
100,000.00
Rp
100,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,000.00
4,095.00
425.25
210.00
10,000.00
26,000.00
4,173.03
45,903.28

1 M1 Pasang Instalasi Titik Lampu 3 X 1,5 Mm2


Pekerja
Tukang Listrik
Kepala Tukang Listrik
Mandor
Kabel Nym Eterna 3X1,5 Mm
Pipa Tanam Pvc 5/8"
Spiral
PERALATAN DAN KELENGKAPAN

org/hari
org/hari
org/hari
org/hari
M1
Ljr
M1
Ls

0.2000
0.4000
0.0200
0.0200
12.0000
1.1000
0.7500
0.2000

@
@
@
@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
6,500.00
Rp
8,000.00
Rp
4,000.00
Rp
18,500.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,000.00
26,000.00
1,350.00
1,400.00
78,000.00
8,800.00
3,000.00
3,700.00
13,225.00
145,475.00

1 Bh Pasang Lampu V Shape Mirror Tl 2X18 W/54 Lengkap


Pekerja
Tukang Listrik
Kepala Tukang Listrik
Mandor

org/hari
org/hari
org/hari
org/hari

0.1000
0.2000
0.0200
0.0200

@
@
@
@

Rp
Rp
Rp
Rp

50,000.00
65,000.00
67,500.00
70,000.00

Rp.
Rp.

5,000.00
13,000.00

Rp.
Rp.

1,350.00
1,400.00

1.0000 @
0.0500 @

Rp
Rp

65,000.00
65,000.00

Rp.
Rp.
Rp.
Rp.

65,000.00
3,250.00
8,900.00
97,900.00

50,000.00
65,000.00
67,500.00
70,000.00
45,000.00

Rp.
Rp.
Rp.

5,000.00
13,000.00
1,350.00

Rp.
Rp.

1,400.00
45,000.00

Rp
45,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.

2,250.00
6,800.00
74,800.00

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
25,000.00
Rp
25,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,000.00
13,000.00
1,350.00
1,400.00
25,000.00
1,250.00
4,700.00
51,700.00

Lampu V Shape Mirror Tl 2X18 W'/54 Lengkap


PERALATAN DAN KELENGKAPAN

Bh
Ls

PROFIT 10%
JUMLAH
37
UPAH

BAHAN

1 Bh Pasang Down Light 6" + Fl 13 Watt Phillips


Pekerja
Tukang Listrik
Kepala Tukang Listrik
Mandor
Down Light 6"+Fl13W Phillips
PERALATAN DAN KELENGKAPAN

38
UPAH

BAHAN

39
UPAH

BAHAN

org/hari
org/hari
org/hari
org/hari
Bh
Ls

0.1000
0.2000
0.0200
0.0200
1.0000

@
@
@
@
@

0.0500 @

Rp
Rp
Rp
Rp
Rp

1 Bh Pasang Saklar Tunggal


Pekerja
Tukang Listrik
Kepala Tukang Listrik
Mandor
Saklar Tunggal
PERALATAN DAN KELENGKAPAN

org/hari
org/hari
org/hari
org/hari
Bh
Ls

0.1000
0.2000
0.0200
0.0200
1.0000
0.0500

1 Bh Pasang Saklar Ganda


Pekerja
Tukang Listrik

org/hari
org/hari

0.1000 @
0.2000 @

Rp
Rp

50,000.00
65,000.00

Rp.
Rp.

5,000.00
13,000.00

Kepala Tukang Listrik


Mandor

org/hari
org/hari

0.0200 @
0.0200 @

Rp
Rp

67,500.00
70,000.00

Bh
Ls

1.0000 @
0.0500 @

Rp
Rp

30,000.00
30,000.00

Rp.
Rp.
Rp.
Rp.

1,350.00
1,400.00
30,000.00
1,500.00

Saklar Ganda
PERALATAN DAN KELENGKAPAN

@
@
@
@
@
@

PROFIT 10%
JUMLAH

Rp.
Rp.

5,225.00
57,475.00

40
UPAH

BAHAN

41
UPAH

BAHAN

1 Bh Pasang Stop Kontak


Pekerja
Tukang Listrik
Kepala Tukang Listrik
Mandor
Stop Kontak
PERALATAN DAN KELENGKAPAN

org/hari
org/hari
org/hari
org/hari
Bh
Ls

0.1000
0.2000
0.0200
0.0200
1.0000
0.0500

1 Bh Pasang Presto
Pekerja

org/hari

0.1000 @

Rp

50,000.00

Rp.

5,000.00

Tukang Listrik
Kepala Tukang Listrik

org/hari
org/hari

0.2000 @
0.0200 @

Rp
Rp

65,000.00
67,500.00

Mandor
Presto
Mcb 6 Amp
Kabel Nya 2,5 Mm
PERALATAN DAN KELENGKAPAN

org/hari
Bh
Bh
M1
Ls

0.0200
1.0000
1.0000
2.5000
0.0500

Rp
70,000.00
Rp
25,000.00
Rp
65,000.00
Rp
5,500.00
Rp
95,500.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,000.00
1,350.00
1,400.00
25,000.00
65,000.00
13,750.00
4,775.00
12,927.50

Rp.

142,202.50

@
@
@
@
@
@

@
@
@
@
@

Rp
50,000.00
Rp
65,000.00
Rp
67,500.00
Rp
70,000.00
Rp
28,000.00
Rp
28,000.00
PROFIT 10%
JUMLAH

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,000.00
13,000.00
1,350.00
1,400.00
28,000.00
1,400.00
5,015.00
55,165.00

DAFTAR HARGA SATUAN UPAH DAN BAHAN

KODE NO.
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

NAMA BARANG / BAHAN / TENAGA

SATUAN

HARGA SATUAN
ASLI

TENAGA
1

Tukang kayu

org/hari

Rp

65,000.00

Kepala tukang kayu

org/hari

Rp

67,500.00

Tukang batu

org/hari

Rp

65,000.00

Kepala tukang batu

org/hari

Rp

67,500.00

Tukang besi

org/hari

Rp

65,000.00

Kepala tukang besi

org/hari

Rp

67,500.00

Tukang las

org/hari

Kepala tukang las

org/hari

Tukang cat

org/hari

Rp

65,000.00

10

Kepala tukang cat

org/hari

Rp

67,500.00

11

Tukang plitur

org/hari

12

Kepala tukang plitur

org/hari

13

Tukang bor

org/hari

14

Kepala tukang bor

org/hari

15

Tukang listrik

org/hari

Rp

65,000.00

16

Kepala tukang listrik

org/hari

Rp

67,500.00

17

Tukang kapur

org/hari

18

Pekerja

org/hari

Rp

50,000.00

19

Mandor

org/hari

Rp

70,000.00

20

Pengawas / Ahli Teknik

org/hari

21

Ahli ukur

org/hari

22

Asisten ahli ukur

org/hari

23

Sopir

org/hari

24

Masinis

org/hari

25

Kernet / pembantu sopir

org/hari

26

Mekanik terlatih

org/hari

27

Operator tak terlatih

org/hari

28

Operator terlatih

org/hari

29

Operator semi terlatih

org/hari

30

Butuh terlatih

org/hari

31

Buruh semi terlatih

org/hari

32

Buruh tak terlatih

org/hari

33

Tukang gali

org/hari

34

Juru godog aspal

org/hari

35

Penjaga

org/hari

36

Penyemprot

org/hari

37

Tukang Sungging

org/hari

38

Kepala Tukang Sungging

org/hari

39

Tukang Ukir

org/hari

40

Kepala Tukang Ukir

org/hari

41

Tukang Prodo

org/hari

42

Kepala Tukang Prodo

org/hari

43

Tukang Gambar

org/hari

44

Tukang Grouting

org/hari

45

Kepala tukang Grouting

org/hari

46

Operator mesin sondir

org/hari

47
48

47

Tukang Aluminium

org/hari

Rp

65,000.00

48

Kepala Tukang Aluminium

org/hari

Rp

67,500.00

49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98

99

100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152

BAHAN/ MATERIAL
1

Kerikil Beton 1-2 cm pecah mesin

M3

Rp

250,000.00

Kerikil Beton 1-2 cm pecah mesin

Kg

Alat Bantu

Set

Rp

90,000.00

Bata Merah

Bh

Rp

660.00

Pasir Urug / Puk

M3

Rp

60,000.00

Pasir Pasang

M3

Rp

110,000.00

Pasir Cor

M3

Rp

130,000.00

Semen PC

Zak

Semen PC

Kg

Rp

1,350.00

10

Semen Warna

Kg

Rp

2,000.00

11

Air

Ltr

Rp

100.00

12

Pipa tanam PVC 5/8"

Ljr

Rp

8,000.00

13

Kabel NYM Eterna 3x1,5 mm

M1

Rp

6,500.00

14

MCB MG 6 Amp

Bh

15

Multipleks 6 mm 1,2 x 2,4 m

Lbr

Rp

90,000.00

16

Calsiboard

Lbr

17

Kayu cetakan sejenis sengon

M3

18

Kayu Bangkirai Balok

M3

Rp

7,000,000.00

19

Kayu Bangkirai Papan

M3

20

Kayu Usuk Meranti

M3

Rp

3,500,000.00

21

Kayu Perancah

M3

22

Papan Kompres

M2

23

Besi Beton ulir dan polos SNI

Kg

Rp

13,000.00

24

Kawat Beton / bendrat

Kg

Rp

15,000.00

25

Genteng Beton

Bh

Rp

3,000.00

26

Genteng Bubungan Beton

Bh

Rp

8,500.00

27

Wood Plank

M1

Rp

35,000.00

28

Seng Talang Datar Lebar 40 cm

M1

29

Keramik Dinding 25x40 cm KW1

M2

30

Keramik List 7x20 cm

Bh

31

Keramik Sponing (kuku macan)

Bh

Rp

1,200.00

32

Cat Meni

Kg

33

Cat Dasar/penutup Dinding Interior

Kg

Rp

30,000.00

34

Cat dasar/penutup Weathershield/Eksterior

Kg

Rp

100,000.00

35

Plamir Tembok

Kg

Rp

21,000.00

36

Plamir Kayu

Kg

37

Plamir Besi

Kg

38

Oli Bekas

Ltr

Rp

2,500.00

39

Kertas Gosok

Lbr

40

Cat Kayu

41

Minyak Cat

42

Kuas ukuran 3-4 Dim

Bh

43

Dempul

Kg

44

Kapek

Bh

45

Lem Kayu

Kg

46

Engsel Pintu Kuningan Asli

Set

Rp

35,000.00

47

Engsel Jendela

Set

48

Grendel Jendela Kuningan

Bh

Rp

17,000.00

49

Hak Angin Kecil

Bh

50

Handle Jendela

Bh

51

Kunci tanam Antik

Bh

52

Kunci Paloma

Set

Rp

150,000.00

Kg
Liter

153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186

53

Kunci Tanam Tanggung

Bh

54

Kaca Polos Tebal 5 mm

M2

55

Kaca Rayband Tebal 5 mm

M2

Rp

85,000.00

56

Paku Biasa Usuk

Kg

Rp

13,000.00

57

Paku Biasa Reng

Kg

Rp

2,500.00

58

Paku Seng

Kg

59

Alumunium 38x38-0,2 mm

M1

60

Alumunium 38x18-0,2 mm

M1

61

Sekrup Fixer dan peralatan

Bh

62

Alumunium Colour 45x100-1 mm

M1

63

Alumunium Colour 35x80-t =3 mm

M1

64

Alumunium Strip Colour lebar 8 cm, t=1.3 mm

M1

65

Karet

M1

66

Sealent

Kg

Rp

63,000.00

67

Spiral

M1

Rp

4,000.00

68

Grendel Pintu

Bh

69

Door Stop

Bh

Rp

18,000.00

70

Grendel Tanam Espanyolet

Set

71

Keramik 40x40 cm Lantai Warna Putih/Motif

M2

Rp

7,791.43

72

Keramik 30x30 cm Lantai Warna Putih/Motif

M2

Rp

4,296.55

73

Bambu

74

Lampu V Shape Mirror TL 2x18 W'/54 Lengkap

Bh

Rp

65,000.00

75

Down Light 6"+FL13W Phillips

Bh

Rp

45,000.00

76

Saklar Tunggal

Bh

Rp

25,000.00

77

Saklar Ganda

Bh

Rp

30,000.00

78

Stop Kontak

Bh

Rp

28,000.00

79

Presto

Bh

Rp

25,000.00

80

MCB 6 Amp

Bh

Rp

65,000.00

81

Kabel NYA 2,5 mm

M1

Rp

5,500.00

82

Alumunium Casment

M1

Rp

95,000.00

83

Alumunium Strip

M1

Rp

85,000.00

84

Kaca Es

M2

Rp

80,000.00

85

Besi Strip

Kg

Rp

15,000.00

86

Kayu Papan

M1

Rp

50,000.00

87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105

Batang

106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158

159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211

212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264

265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298

299
300

ALAT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

REKAPITULASI KEBUTUHAN TENAGA DAN BAHAN/ MATERIAL PROYEK :


PEMBANGUNAN RUANG KELAS
NO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67

NAMA

BARANG

BAHAN

TENAGA INDEX

Tukang kayu
Kepala tukang kayu
Tukang batu
Kepala tukang batu
Tukang besi
Kepala tukang besi
Tukang cat
Kepala tukang cat
Tukang listrik
Kepala tukang listrik
Pekerja
Mandor
Tukang Aluminium
Kepala Tukang Aluminium
Kerikil Beton 1-2 cm pecah mesin
Alat Bantu
Bata Merah
Pasir Urug / Puk
Pasir Pasang
Pasir Cor
Semen PC
Semen Warna
Air
Pipa tanam PVC 5/8"
Kabel NYM Eterna 3x1,5 mm
Multipleks 6 mm 1,2 x 2,4 m
Kayu Bangkirai Balok
Kayu Usuk Meranti
Besi Beton ulir dan polos SNI
Kawat Beton / bendrat
Genteng Beton
Genteng Bubungan Beton
Wood Plank
Keramik Sponing (kuku macan)
Cat Dasar/penutup Dinding Interior
Cat dasar/penutup Weathershield/Eksterior
Plamir Tembok
Oli Bekas
Engsel Pintu Kuningan Asli
Grendel Jendela Kuningan
Kunci Paloma
Kaca Rayband Tebal 5 mm
Paku Biasa Usuk
Sekrup Fixer dan peralatan
Sealent
Spiral
Door Stop
Keramik 40x40 cm Lantai Warna Putih/Motif
Keramik 30x30 cm Lantai Warna Putih/Motif
Lampu V Shape Mirror TL 2x18 W'/54 Lengkap
Down Light 6"+FL13W Phillips
Saklar Tunggal
Saklar Ganda
Stop Kontak
Presto
MCB 6 Amp
Kabel NYA 2,5 mm
Alumunium Casment
Alumunium Strip
Kaca Es
Besi Strip
Kayu Papan
Pembersihan Lokasi
Pembongkaran Atap
Papan Nama Proyek
Pasangan Bata Berongga
Benangan Sudut Dinding dan Kolom

256.9706
25.6971
247.2185
24.7726
54.4628
5.4463
35.2617
3.5262
17.8000
1.2600
1,153.7748
72.8463
5.7769
0.5777
78.1466
17.8000
21,259.0000
3.1680
44.1616
55.7665
41,804.8132
444.9800
22,050.4000
28.6000
312.0000
104.4750
6.7248
5.6218
8,169.4169
116.7060
3,267.0000
101.5000
83.6000
49.5000
151.6104
49.8852
42.1140
99.5000
18.0000
3.0000
3.0000
21.3987
232.1890
233.1600
6.9948
19.5000
6.0000
1,663.9475
237.4000
9.0000
3.0000
8.0000
6.0000
9.0000
2.0000
2.0000
5.0000
165.0888
131.2248
1.6017
46.7400
24.2000
1.0000
1.0000
1.0000
2.0000
222.5600

SATUAN

org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
org/hari
M3
Set
Bh
M3
M3
M3
Kg
Kg
Ltr
Ljr
M1
Lbr
M3
M3
Kg
Kg
Bh
Bh
M1
Bh
Kg
Kg
Kg
Ltr
Set
Bh
Set
M2
Kg
Bh
Kg
M1
Bh
M2
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M1
M1
M1
M2
Kg
M1
Ls
Ls
Ls
Unit
m1

HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

SATUAN

TOTAL BIAYA DIKELUARKAN

65,000.00 Rp
67,500.00 Rp
65,000.00 Rp
67,500.00 Rp
65,000.00 Rp
67,500.00 Rp
65,000.00 Rp
67,500.00 Rp
65,000.00 Rp
67,500.00 Rp
50,000.00 Rp
70,000.00 Rp
65,000.00 Rp
67,500.00 Rp
250,000.00 Rp
90,000.00 Rp
660.00 Rp
60,000.00 Rp
110,000.00 Rp
130,000.00 Rp
1,350.00 Rp
2,000.00 Rp
100.00 Rp
8,000.00 Rp
6,500.00 Rp
90,000.00 Rp
7,000,000.00 Rp
3,500,000.00 Rp
13,000.00 Rp
15,000.00 Rp
3,000.00 Rp
8,500.00 Rp
35,000.00 Rp
1,200.00 Rp
30,000.00 Rp
100,000.00 Rp
21,000.00 Rp
2,500.00 Rp
35,000.00 Rp
17,000.00 Rp
150,000.00 Rp
85,000.00 Rp
13,000.00 Rp
2,500.00 Rp
63,000.00 Rp
4,000.00 Rp
18,000.00 Rp
7,791.43 Rp
4,296.55 Rp
65,000.00 Rp
45,000.00 Rp
25,000.00 Rp
30,000.00 Rp
28,000.00 Rp
25,000.00 Rp
65,000.00 Rp
5,500.00 Rp
95,000.00 Rp
85,000.00 Rp
80,000.00 Rp
15,000.00 Rp
50,000.00 Rp
300,000.00 Rp
1,250,000.00 Rp
400,000.00 Rp
200,000.00 Rp
2,500.00 Rp

16,703,089.00
1,734,551.55
16,069,199.25
1,672,148.48
3,540,080.64
367,623.76
2,292,012.45
238,016.68
1,157,000.00
85,050.00
57,688,739.95
5,099,241.39
375,499.80
38,994.21
19,536,647.50
1,602,000.00
14,030,940.00
190,080.00
4,857,778.20
7,249,646.95
56,436,497.87
889,960.00
2,205,040.00
228,800.00
2,028,000.00
9,402,750.00
47,073,488.00
19,676,125.00
106,202,419.05
1,750,589.33
9,801,000.00
862,750.00
2,926,000.00
59,400.00
4,548,312.00
4,988,520.00
884,394.00
248,750.00
630,000.00
51,000.00
450,000.00
1,818,889.50
3,018,457.00
582,900.00
440,672.40
78,000.00
108,000.00
12,964,529.36
1,020,000.00
585,000.00
135,000.00
200,000.00
180,000.00
252,000.00
50,000.00
130,000.00
27,500.00
15,683,436.00
11,154,108.00
128,132.93
701,100.00
1,210,000.00
300,000.00
1,250,000.00
400,000.00
400,000.00
556,400.00

68
69
70
71
72
73
74
75
76

Pasang Papan Reuter


Penyambungan ke Instalasi Terdekat
PERALATAN DAN KELENGKAPAN
PERALATAN DAN KELENGKAPAN
PERALATAN DAN KELENGKAPAN
PERALATAN DAN KELENGKAPAN
PERALATAN DAN KELENGKAPAN
PERALATAN DAN KELENGKAPAN
PERALATAN DAN KELENGKAPAN

5.8000
1.0000
5.2000
0.4500
0.1500
0.4000
0.3000
0.4500
0.1000

m2
Unit
Ls
Ls
Ls
Ls
Ls
Ls
Ls

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

350,000.00
2,500,000.00
18,500.00
65,000.00
45,000.00
25,000.00
30,000.00
28,000.00
95,500.00

SUB TOTAL
PROFIT 10 % (KECUALI LS DI RAB)
JUMLAH
PPN 10 %
TOTAL JUMLAH

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,030,000.00
2,500,000.00
96,200.00
29,250.00
6,750.00
10,000.00
9,000.00
12,600.00
9,550.00

Rp
Rp
Rp
Rp
Rp

483,949,610.23
47,651,321.02
531,600,931.25
53,160,093.13
584,761,000.00

DAFTAR HARGA SATUAN UPAH DAN BAHAN

NO.

NAMA BARANG / BAHAN / TENAGA

SATUAN

HARGA SATUAN

TENAGA
1

Tukang kayu

org/hari

Rp

65,000.00

Kepala tukang kayu

org/hari

Rp

67,500.00

Tukang batu

org/hari

Rp

65,000.00

Kepala tukang batu

org/hari

Rp

67,500.00

Tukang besi

org/hari

Rp

65,000.00

Kepala tukang besi

org/hari

Rp

67,500.00

Tukang cat

org/hari

Rp

65,000.00

Kepala tukang cat

org/hari

Rp

67,500.00

Tukang listrik

org/hari

Rp

65,000.00

10

Kepala tukang listrik

org/hari

Rp

67,500.00

11

Pekerja

org/hari

Rp

50,000.00

12

Mandor

org/hari

Rp

70,000.00

13

Tukang Aluminium

org/hari

Rp

65,000.00

14

Kepala Tukang Aluminium

org/hari

Rp

67,500.00

BAHAN/ MATERIAL
1

Kerikil Beton 1-2 cm pecah mesin

M3

Rp

250,000.00

Alat Bantu

Set

Rp

90,000.00

Bata Merah

Bh

Rp

660.00

Pasir Urug / Puk

M3

Rp

60,000.00

Pasir Pasang

M3

Rp

110,000.00

Pasir Cor

M3

Rp

130,000.00

Semen PC

Kg

Rp

1,350.00

Semen Warna

Kg

Rp

2,000.00

Air

Ltr

Rp

100.00

10

Pipa tanam PVC 5/8"

Ljr

Rp

8,000.00

11

Kabel NYM Eterna 3x1,5 mm

M1

Rp

6,500.00

12

Multipleks 6 mm 1,2 x 2,4 m

Lbr

Rp

90,000.00

13

Kayu Bangkirai Balok

M3

Rp

7,000,000.00

14

Kayu Usuk Meranti

M3

Rp

3,500,000.00

15

Besi Beton ulir dan polos SNI

Kg

Rp

13,000.00

16

Kawat Beton / bendrat

Kg

Rp

15,000.00

17

Genteng Beton

Bh

Rp

3,000.00

18

Genteng Bubungan Beton

Bh

Rp

8,500.00

19

Wood Plank

M1

Rp

35,000.00

20

Keramik Sponing (kuku macan)

Bh

Rp

1,200.00

21

Cat Dasar/penutup Dinding Interior

Kg

Rp

30,000.00

22

Cat dasar/penutup Weathershield/Eksterior

Kg

Rp

100,000.00

23

Plamir Tembok

Kg

Rp

21,000.00

24

Oli Bekas

Ltr

Rp

2,500.00

25

Engsel Pintu Kuningan Asli

Set

Rp

35,000.00

26

Grendel Jendela Kuningan

Bh

Rp

17,000.00

27

Kunci Paloma

Set

Rp

150,000.00

28

Kaca Rayband Tebal 5 mm

M2

Rp

85,000.00

29

Paku Biasa Usuk

Kg

Rp

13,000.00

30

Sekrup Fixer dan peralatan

Bh

Rp

2,500.00

31

Sealent

Kg

Rp

63,000.00

32

Spiral

M1

Rp

4,000.00

33

Door Stop

Bh

Rp

18,000.00

34

Keramik 40x40 cm Lantai Warna Putih/Motif

M2

Rp

7,791.43

35

Keramik 30x30 cm Lantai Warna Putih/Motif

M2

Rp

4,296.55

36

Lampu V Shape Mirror TL 2x18 W'/54 Lengkap

Bh

Rp

65,000.00

37

Down Light 6"+FL13W Phillips

Bh

Rp

45,000.00

38

Saklar Tunggal

Bh

Rp

25,000.00

39

Saklar Ganda

Bh

Rp

30,000.00

40

Stop Kontak

Bh

Rp

28,000.00

41

Presto

Bh

Rp

25,000.00

42

MCB 6 Amp

Bh

Rp

65,000.00

43

Kabel NYA 2,5 mm

M1

Rp

5,500.00

44

Alumunium Casment

M1

Rp

95,000.00

45

Alumunium Strip

M1

Rp

85,000.00

46

Kaca Es

M2

Rp

80,000.00

47

Besi Strip

Kg

Rp

15,000.00

48

Kayu Papan

M1

Rp

50,000.00

DAFTAR PERSONIL INTI


NAMA PERUSAHAAN
ALAMAT
KEGIATAN
PEKERJAAN
LOKASI
No.

:
:
:
:
:

CV. ORIGINAL MITRA TEKNIK


Jl. Diponegoro No. 17 Namakota/kabupaten, Namapropinsi
Perencanaan Teknis Pembangunan Ruang Kelas
PEMBANGUNAN RUANG KELAS
SMPN I SUKAMAJU KECAMATAN SUKAJAYA
Kab. Namakota/kabupaten

Nama

Tempat / Tanggal Lahir

DIO HEMAWAN, ST

Bojonegoro

03 Maret 1975

SUJOKO

Tuban

18 Agustus 1979

SUSILO PRIO

Nganjuk

12 Juli 1982

SUSI SUSIATI

Tukungagung 21 Januari 1990

REVAN ALVINO

Jember

19 Juni 1989

Jabatan

Pendidikan

No. Ijazah

Pengalaman Kerja
(Tahun)

Pen Jawab Tehnik

S-1

153202317

Pelaksana

STM

04 OB on 0011356

005632-13/ASTTI/SKT/IV/2014
005633-13/ASTTI/SKT/IV/2014
-

Logistik

SMK

04 Mk 0196239

Admisnitrasi

SMK

DN-05 Mk 0380159

Keuangan

S MA

04 OB og 0628494

No. SKT/SKA

Namakota/kabupaten, 04 Oktober 2014


CV. ORIGINAL MITRA TEKNIK

DIO A. HEMAWAN, ST
Direktur

DAFTAR PERALATAN UTAMA YANG DIGUNAKAN


NAMA PERUSAHAAN
ALAMAT
KEGIATAN
PEKERJAAN
LOKASI
No.

Jenis Peralatan

:
:
:
:
:

CV. ORIGINAL MITRA TEKNIK


Jl. Diponegoro No. 17 Namakota/kabupaten, Namapropinsi
Perencanaan Teknis Pembangunan Ruang Kelas
PEMBANGUNAN RUANG KELAS
SMPN I SUKAMAJU KECAMATAN SUKAJAYA
Kab. Namakota/kabupaten
Merek dan
Tahun
Jumlah
Kapasitas
Type
Pembuatan

Kondisi

Lokasi Sekarang

Bukti Kepemilikan

Truck

5 M3

Mitshubisi

2008

Baik

Basecamp

Sewa

Stamper

Kubota

2003

Baik

Basecamp

Milik Sendiri

Beton Molen

0,5 M3

Dong Feng

2003

Baik

Basecamp

Milik Sendiri

Sepeda Motor

Honda

1997

Baik

Basecamp

Milik Sendiri

Pompa Air

4 PK

Kubota

2003

Baik

Basecamp

Milik Sendiri

Vibrator

Honda

2003

Baik

Basecamp

Milik Sendiri

Mesin Gilas

2008

Baik

Basecamp

Sewa

Namakota/kabupaten, 04 Oktober 2014


CV. ORIGINAL MITRA TEKNIK

DIO A. HEMAWAN, ST
Direktur

A
1
2
3
1
2
3
B
1
2
3
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
IV
1
2
3
4
5
6

PEKERJAAN PERSIAPAN DAN TANAH


Pembersihan Lokasi
Pembongkaran Atap
Papan Nama Proyek
Galian Tanah Pondasi Poer
Bongkar dan Galian Sloof Lama
Urugan Pasir Bawah Poer, tebal 5 cm
PEKERJAAN STRUKTUR
Pengeboran Strauss pile Dia 25 cm - 300 Cm
Pengeboran Strauss pile Dia 25 cm - 200 Cm
Lantai Rabbat Beton Mutu B0, tebal 5 cm
PEKERJAAN BETON STRUKTUR
Beton Strauss pile 30-3.00 m, K 175 Kg/Cm2
Beton Strauss pile 30-1.50 m, K 175 Kg/Cm2
Beton Poer Besar 0,60 x 1,40 x 0,20 m, K.175 Kg/cm2
Beton Poer Kecil 0,60 x 0,60 x 0,20 m, K.175 Kg/cm2
Beton Sloof Penyambungan S1, 20x40 cm, K 175 Kg/cm2
Beton Sloof Teras S2, 15x20 cm, K 175 Kg/cm2
Beton Kolom Baru Struktur K1 15x40 cm, K 175 Kg/cm2
Beton Kolom Tambahan 15x10 cm, K 175 Kg/cm2
Beton Balok Struktur B1 25x50 cm, K 175 Kg/cm2
Beton Balok Struktur B2 20x45 cm, K 175 Kg/cm2
Beton Balok Struktur B3 15x20 cm, K 175 Kg/cm2
Beton Struktur Listplank 10x40 cm, K.175 Kg/cm2
Beton Struktur Plat Lantai tebal 12 cm, K.175 Kg/cm2
Beton Balok Latai, 12x15 cm, K.175 Kg/cm2
Beton Kolom Baru Struktur K1 20x30 cm, K 175 Kg/cm2
Beton Balok Latai, 12x15 cm, K 175 Kg/cm2
Beton Ring Balok, 15x20 cm, K 175 Kg/cm2
Beton Konsol dan Gewel, 15x20 cm, K 175 Kg/cm2
PEKERJAAN PEMBESIAN
Beton Strauss pile 30-3.00 m
Beton Strauss pile 30-1.50 m
Beton Poer Besar
Beton Poer Kecil
Beton Sloof Penyambungan S1
Beton Sloof S2
Beton Kolom Baru Struktur K1
Beton Kolom Tambahan
Beton Balok Struktur B1
Beton Balok Struktur B2
Beton Balok Struktur B3
Beton Struktur Listplank
Beton Struktur Plat Lantai
Beton Balok Latai
Beton Kolom Baru Struktur K1
Beton Balok Latai
Beton Ring Balok
Beton Konsol dan Gewel
PEKERJAAN BEGESTING
Beton Poer Besar 0,60 x 1,40 x 0,20
Beton Poer Kecil 0,60 x 0,60 x 0,20
Beton Sloof Penyambungan S1, 20x40 cm
Beton Sloof Teras S2, 15x20 cm
Beton Kolom Baru Struktur K1 15x40 cm
Beton Kolom Tambahan 15x10 cm

0.056
0.235
0.075
0.335
0.168
0.048
0.513
0.031
0.163
1.870
0.091
1.214
0.093
0.385
0.206
1.083
0.272
1.031
2.445
0.139
0.210
5.458
0.265
1.083
0.265
0.440
0.478
0.973
0.047
1.819
0.099
0.482
0.278
1.930
0.877
2.536
3.581
0.315
0.243
6.461
0.472
1.930
0.535
0.728
0.482
1.259
0.270
0.504
0.045
0.441
0.126

1
1
1
1
1
1

1
1
1
1
1
1

1
1
1

1
1
1

1
1
1
1
2
2
2
2
3
3
3
3
4
4
5
5
5
5

1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1

5
5
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
6

1
1
1
1
1
1
1
1
4
2
1
1
2
1
1
1
1
1

7
7
7
7
7
7

1
1
1
1
1
1

7
8
9
10
11
12
1
2
3
4
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
9
10
11
1
2
3
C
1
2
3
4
1
2
D
1
2
3
4
5
6
7
8
1
2
3

Beton Balok Struktur B1 25x50 cm


Beton Balok Struktur B2 20x45 cm
Beton Balok Struktur B3 15x20 cm
Beton Struktur Listplank 10x40 cm
Beton Struktur Plat Lantai tebal 12 cm
Beton Balok Latai, 12x15 cm
Beton Kolom Baru Struktur K1 20x30 cm
Beton Balok Latai, 12x15 cm
Beton Ring Balok, 15x20 cm
Beton Konsol dan Gewel, 15x20 cm
Pasang Dinding Bata 1Pc : 6Ps Tambahan 50 cm Lantai I
Pasang Dinding Bata 1Pc : 6Ps Lantai II + Gewel
Pasang Dinding Bata Trasram 1Pc : 3Ps Lantai I + II
Plesteran Dinding Trasram 1Pc : 3Ps Lantai II
Plesteran Dinding 1Pc : 6Ps Lantai I + II
Pasangan Bata Berongga
Benangan Sudut Dinding dan Kolom
Pasang Kuda-2 kayu bangkirai, 6x12 cm (kelas II)
Pasang Kuda-2 kayu bahan lama
Pasang Nok gording kayu bangkirai , 6x12 cm (kelas II)
Pasang Nok gording kayu bahan lama
Pasang Usuk dan Reng kayu Kruing
Pasang Usuk dan Reng kayu bahan lama
Pasang Papan Reuter
Pasang Listplank Woodplank
Pasang Papan Kompres
Pasang Genteng Beton
Pasang Bubungan Genteng Beton
Kusen Alumunium Colour P2
Kusen Alumunium Colour J2
Kusen Alumunium Colour J3
PEKERJAAN ARSITEKTUR
Pasang Keramik Lantai 40x40 Cm Dalam Gedung + Badukan
Pasang Keramik Lantai 30x30 Cm Lantai I
Pasang Keramik Lantai 40x40 Cm Teras Warna
Pasang Keramik Sudut
Cat Dinding Exterior (Weathershield)
Cat Dinding Interior
PEKERJAAN M/E
Pasang Instalasi Listrik dan stop kontak
Lampu V Shape Mirror TL 2x18 W/54
Pasang Down Light IDL 108/A White + Lampu PLC 82, 18 Watt
Pasang Saklar Engkel Push On Off Cream A107
Pasang Saklar Seri Push On Off Cream A108
Pasang Stop Kontak 6100/6122, 240
Pasang Presto + MCB MG 2x6 Amp
Penyambungan ke Instalasi Terdekat
Pasang Dinding Bata 1 Pc : 6 Ps
Plesteran Dinding 1 Pc : 6 Ps
Plat Beton Tangga Tebal 20 cm ( Termasuk Plat Injak )

0.809
1.699
0.273
0.275
2.889
0.384
0.420
0.576
0.384
0.831
0.608
4.127
0.303
0.259
3.867
0.075
0.105
1.464
0.222
1.572
0.332
7.617
0.611
0.382
0.936
0.302
3.151
0.510
3.784
1.908
0.882
5.799
0.559
1.352
0.020
1.197
1.623
0.712
0.166
0.042
0.078
0.065
0.093
0.053
0.470
0.392
0.325
0.413

7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
8
8
8
8
8
8
8
8
8
8
8
8
9
9

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
2
1
2
2
1

9
9
9
9
10
10

2
1
1
1
1
1

10
10
10
10
10
10
10
10
10
10
10

1
1
1
1
1
1
1
1
1
1
1

100.00
99.000
1
2

TARGET PELAKSANAAN
JML. KOMULATIF PELAKSANAAN

10
10
1.925

JADWAL PELAKSANAAN PEKERJAAN


NAMA PROGRAM
NAMA KEGIATAN
LOKASI

NO.

: PENDIDIKAN MENENGAH
: Perencanaan Teknis Pembangunan Ruang Kelas
: SMPN I SUKAMAJU KECAMATAN SUKAJAYA
Kab. Namakota/kabupaten
URAIAN PEKERJAAN

WAKTU PELAKSANAAN
WAKTU PEMELIHARAAN

JANGKA WAKTU PELAKSANAAN

BOBOT
(%)

JANGKA WAKTU PEMELIHARAAN

MINGGU / PERIODE KE 1

PEKERJAAN PERSIAPAN DAN TANAH

Pembersihan Lokasi

0.056

0.056

Pembongkaran Atap

0.235

0.235

Papan Nama Proyek

0.075

0.075

Galian Tanah Pondasi Poer

0.335

0.335

Bongkar dan Galian Sloof Lama

0.168

0.168

Urugan Pasir Bawah Poer, tebal 5 cm

0.048

0.048

PEKERJAAN STRUKTUR

Pengeboran Strauss pile Dia 25 cm - 300 Cm

0.513

0.513

Pengeboran Strauss pile Dia 25 cm - 200 Cm

0.031

0.031

Lantai Rabbat Beton Mutu B0, tebal 5 cm

0.163

0.163

II

PEKERJAAN BETON STRUKTUR

Beton Strauss pile 30-3.00 m, K 175 Kg/Cm2

1.870

1.870

Beton Strauss pile 30-1.50 m, K 175 Kg/Cm2

0.091

0.091

Beton Poer Besar 0,60 x 1,40 x 0,20 m, K.175 Kg/cm2

1.214

1.214

Beton Poer Kecil 0,60 x 0,60 x 0,20 m, K.175 Kg/cm2

0.093

0.093

Beton Sloof Penyambungan S1, 20x40 cm, K 175 Kg/cm2

0.385

0.385

Beton Sloof Teras S2, 15x20 cm, K 175 Kg/cm2

0.206

0.206

Beton Kolom Baru Struktur K1 15x40 cm, K 175 Kg/cm2

1.083

1.083

Beton Kolom Tambahan 15x10 cm, K 175 Kg/cm2

0.272

0.272

Beton Balok Struktur B1 25x50 cm, K 175 Kg/cm2

1.031

1.031

10

Beton Balok Struktur B2 20x45 cm, K 175 Kg/cm2

2.445

2.445

11

Beton Balok Struktur B3 15x20 cm, K 175 Kg/cm2

0.139

0.139

12

Beton Struktur Listplank 10x40 cm, K.175 Kg/cm2

0.210

0.210

13

Beton Struktur Plat Lantai tebal 12 cm, K.175 Kg/cm2

5.458

4.930

14

Beton Balok Latai, 12x15 cm, K.175 Kg/cm2

0.265

0.265

Beton Kolom Baru Struktur K1 20x30 cm, K 175 Kg/cm2

1.083

1.083

Beton Balok Latai, 12x15 cm, K 175 Kg/cm2

0.265

0.265

Beton Ring Balok, 15x20 cm, K 175 Kg/cm2

0.440

0.440

Beton Konsol dan Gewel, 15x20 cm, K 175 Kg/cm2

0.478

0.478

III

PEKERJAAN PEMBESIAN

Beton Strauss pile 30-3.00 m

0.973

0.973

Beton Strauss pile 30-1.50 m

0.047

0.047

Beton Poer Besar

1.819

1.819

Beton Poer Kecil

0.099

0.099

Beton Sloof Penyambungan S1

0.482

0.482

Beton Sloof S2

0.278

0.278

Beton Kolom Baru Struktur K1

1.930

1.930

Beton Kolom Tambahan

0.877

0.877

Beton Balok Struktur B1

2.536

0.837

0.837

10

Beton Balok Struktur B2

3.581

1.882

1.700

11

Beton Balok Struktur B3

0.315

0.315

12

Beton Struktur Listplank

0.243

0.243

13

Beton Struktur Plat Lantai

6.461

4.762

14

Beton Balok Latai

0.472

0.472

Beton Kolom Baru Struktur K1

1.930

1.930

Beton Balok Latai

0.535

0.535

Beton Ring Balok

0.728

0.728

Beton Konsol dan Gewel

0.482

0.482

IV

PEKERJAAN BEGESTING

Beton Poer Besar 0,60 x 1,40 x 0,20

1.259

1.259

Beton Poer Kecil 0,60 x 0,60 x 0,20

0.270

0.270

Beton Sloof Penyambungan S1, 20x40 cm

0.504

0.504

Beton Sloof Teras S2, 15x20 cm

0.045

0.045

Beton Kolom Baru Struktur K1 15x40 cm

0.441

0.441

Beton Kolom Tambahan 15x10 cm

0.126

0.126

Beton Balok Struktur B1 25x50 cm

0.809

0.809

BOBOT (%)
8

10

II

III

IV

KETERANGAN
VI

0.528

0.837

0.026

1.700

50%

Beton Balok Struktur B2 20x45 cm

1.699

1.699

Beton Balok Struktur B3 15x20 cm

0.273

0.273

Beton Struktur Listplank 10x40 cm

0.275

0.275

11

Beton Struktur Plat Lantai tebal 12 cm

2.889

2.889

12

Beton Balok Latai, 12x15 cm

0.384

0.384

Beton Kolom Baru Struktur K1 20x30 cm

0.420

0.420

Beton Balok Latai, 12x15 cm

0.576

0.576

Beton Ring Balok, 15x20 cm

0.384

0.384

Beton Konsol dan Gewel, 15x20 cm

0.831

0.831

Pasang Dinding Bata 1Pc : 6Ps Tambahan 50 cm Lantai I

0.608

0.608

Pasang Dinding Bata 1Pc : 6Ps Lantai II + Gewel

4.127

4.127

Pasang Dinding Bata Trasram 1Pc : 3Ps Lantai I + II

0.303

0.303

Plesteran Dinding Trasram 1Pc : 3Ps Lantai II

0.259

0.259

Plesteran Dinding 1Pc : 6Ps Lantai I + II

3.867

3.867

Pasangan Bata Berongga

0.075

0.075

Benangan Sudut Dinding dan Kolom

0.105

0.105

Pasang Kuda-2 kayu bangkirai, 6x12 cm (kelas II)

1.464

1.464

Pasang Kuda-2 kayu bahan lama

0.222

0.222

Pasang Nok gording kayu bangkirai , 6x12 cm (kelas II)

1.572

1.572

Pasang Nok gording kayu bahan lama

0.332

0.332

Pasang Usuk dan Reng kayu Kruing

7.617

7.514

Pasang Usuk dan Reng kayu bahan lama

0.611

0.611

Pasang Papan Reuter

0.382

0.382

0.103

Pasang Listplank Woodplank

0.936

0.936

Pasang Papan Kompres

0.302

0.302

10

Pasang Genteng Beton

3.151

3.048

11

Pasang Bubungan Genteng Beton

0.510

0.510

Kusen Alumunium Colour P2

3.784

3.681

Kusen Alumunium Colour J2

1.908

1.779

Kusen Alumunium Colour J3

0.882

0.882

PEKERJAAN ARSITEKTUR

Pasang Keramik Lantai 40x40 Cm Dalam Gedung + Badukan

5.799

5.669

Pasang Keramik Lantai 30x30 Cm Lantai I

0.559

0.559

Pasang Keramik Lantai 40x40 Cm Teras Warna

1.352

1.352

Pasang Keramik Sudut

0.020

0.020

Cat Dinding Exterior (Weathershield)

1.197

1.197

Cat Dinding Interior

1.623

1.623

PEKERJAAN M/E

Pasang Instalasi Listrik dan stop kontak

0.712

0.712

Lampu V Shape Mirror TL 2x18 W/54

0.166

0.166

Pasang Down Light IDL 108/A White + Lampu PLC 82, 18 Watt

0.042

0.042

Pasang Saklar Engkel Push On Off Cream A107

0.078

0.078

Pasang Saklar Seri Push On Off Cream A108

0.065

0.065

Pasang Stop Kontak 6100/6122, 240

0.093

0.093

Pasang Presto + MCB MG 2x6 Amp

0.053

0.053

Penyambungan ke Instalasi Terdekat

0.470

0.470

Pasang Dinding Bata 1 Pc : 6 Ps

0.392

0.392

Plesteran Dinding 1 Pc : 6 Ps

0.325

0.325

Plat Beton Tangga Tebal 20 cm ( Termasuk Plat Injak )

0.413

0.413

1
2

TARGET PELAKSANAAN
JML. KOMULATIF PELAKSANAAN

4.892
4.892

BULAN/PERIODE KEI

100%

10

0.000

75 HARI
180 HARI

1.946
6.839

3.825
10.664

5.195
15.858

9.299
25.157

12.185
37.342

24.765
62.107

21.410
83.517

0.103
0.103

10.594
94.112

0.130

0.130

0%

5.888
100.000

Namakota/kabupaten, 04 Oktober 2014


CV. ORIGINAL MITRA TEKNIK

DIO A. HEMAWAN, ST
Direktur

METODE
PELAKSANAAN PEKERJAAN :
PEMBANGUNAN RUANG KELAS

PENDAHULUAN
Berkenaan dengan Kegiatan Pembangunan Ruang Kelas Baru SMP N 1 Purwosari Kec. Purwosari
Kab. Bojonegoro, maka kami selaku kontraktor pelaksana ingin ikut berpartisipasi dengan
mengajukan metode pelaksanaan pekerjaan tersebut diatas yang di dalamnya memuat sistematika
dan konsepsi dasar pelaksanaan dengan tetap memperhatikan kesatuan (unity) dan keselarasan
harmoni tanpa menimbulkan dampak terhadap lingkungan sekitarnya.
MAKSUD DAN TUJUAN
Metode pelaksanaan ini sebagai pedoman yang berisikan kerangka dasar pekerjaan pelaksanaan
yang memuat informasi sebagai masukan serta beberapa ketentuan mengenai sasaran, kriteria,
batasan dan keluaran (out put) yang dituntut dari garis besar proses yang harus dipenuhi,
diperhatikan dan diterjemahkan lebih lanjut agar kontraktor pelaksana dapat melaksanakan tugas
dan tanggung jawabnya dengan baik sehingga pengaturan, pengembangan dan peningkatan tugas
(sinkronisasi koordinatif) dapat terselenggara sesuai dengan waktu yang telah
direncanakan/ditentukan.
METODE PENYELESAIAN PEKERJAAN UTAMA
A

PEKERJAAN PERSIAPAN DAN TANAH

I.

PEKERJAAN PERSIAPAN
Sebelum melaksanakan pekerjaan terlebih dahulu akan kita lakukan pembersihan lokasi.
pembongkaran sekaligus pasang bouwplank dan uitset, dan juga melakukan mobilisasi alat.

II.

PEKERJAAN TANAH
Setelah persiapan selesai selanjutnya kita akan melakukan galian tanah untuk pondasi, sloof
dan saluran dan melakukan urugan pasir.

PEKERJAAN STRUKTUR

PEKERJAAN PONDASI STRUKTUR


Sebelum melaksanakan pekerjaan beton, terlebih dahulu kita lakukan pengeboran strous pile
untuk pondasi dan juga menyiapkan lantai kerja.

II

PEKERJAAN BETON STRUKTUR


Setelah pekerjaan pondasi struktur dan perakitan besi maupun begesting selesai selanjutnya
kita melakukan pengecoran beton struktur.

III

PEKERJAAN PEMBESIAN
Perakitan besi kita lakukan sebelum pengecoran beton kita lakukan. Perakitan kita
laksanakan sesuai dengan syarat tehnis dan gambar yang ada.

IV

PEKERJAAN BEGESTING
Pekerjaan begesting kita pasang sesuai dengan kebutuhan yang ada, untuk pondasi, sloof
maupun balok.

PEKERJAAN DINDING
Setelah pekerjaan pondasi struktur dan kita lakukan pengecoran sloof selesai, selanjutnya
kita akan melakukan pekerjaan pasangan dinding bata yang kita lengkapi dengan plesteran
acian dan benangan.

VI

PEKERJAAN RANGKA ATAP


Setelah pekerjaan pasangan dinding selesai selanjutnya kita melakukan pekerjaan rangka
atap, dimana kita akan memasang kuda-kuda kayu, nok gording, usuk dan menggunakan
bahan baru dan juga lama, listplank, genteng dan bubungan genteng.

VII

PEKERJAAN KUSEN, PINTU, JENDELA & BV


Sambil berjalan pekerjaan pasangan, kita akan memasang kusen, baik pintu maupun jendela
dan setelah pasangan selesai selanjutnya kita pasang daun pintu dan juga jendela.

PEKERJAAN ARSITEKTUR

PEKERJAAN KERAMIK
Setelah kita rabat selanjutnya kita pasang keramik dan kita sesuaikan ukurannya dan
warnanya untuk masing-masing ruangan, untuk lantai.

II

PEKERJAAN CAT
Setelah pekerjaan dinding dan plafond selesai kita akan melaksanakan pengecatan, baik
interior maupun eksterior.

D
I

PEKERJAAN M/E
PEKERJAAN ELEKTRIKAL
Pekerjaan ini kita laksanakan dengan terlebih dahulu memasang instalasi listrik, baru
kemudian kita pasang stop kontak, saklar maupun lampu. Dan juga kita akan melakukan
penyambungan instalasi terdekat.

E
I

PEKERJAAN TANGGA BETON


PEKERJAAN TANGGA BETON
Pekerjaan tangga beton kita lakukan dengan melakukan pemasangan dinding bata,
termasuk plesteran dan plat beton tangga.
PENUTUP

Sehubungan dengan terbatasnya waktu pelaksanaan yang ditetapkan, maka efektifitas dan
efisiensi dalam penyusunan program dan pelaksanaan pekerjaan menjadi hal utama yang perlu
mendapatkan perhatian utama sehingga dapat mencapai hasil karya yang lebih optimal
Demikian uraian singkat kami yang merupakan pendekatan dalam pencapaian hasil karya
pelaksanaan secara sistematika berdasarkan pengalaman kami selama ini dalam menangani
pelaksanaan pembangunan proyek fisik pemerintahan.

Namakota/kabupaten, 04 Oktober 2014


Pemimpin
CV. ORIGINAL MITRA TEKNIK

DIO A. HEMAWAN, ST
Direktur

REKAPITULASI PERHITUNGAN TKDN


Penyedia Jasa
Alamat
Paket

: CV. ORIGINAL MITRA TEKNIK


: Jl. Diponegoro No. 17 Namakota/kabupaten, Namapropinsi
: PEMBANGUNAN RUANG KELAS

Nilai Gabungan Barang/Jasa (Rp.)


Uraian Pekerjaan

(1)
Barang
I. Material Langsung
( Bahan baku )
II. Peralatan ( Barang
jadi )
A. Sub Total Barang
Jasa
III. Manajemen Proyek
dan Perekayasaan
IV. Alat Kerja / Fasilitas
Kerja
V. Konstruksi dan
Fabrikasi
VI. Jasa Umum
B. Sub Total Jasa
C. TOTAL Biaya ( A +
B)

TKDN

Total
DN

LN

(2)

(3)

Ribu Rp.
(4)

KDN
(5)

Barang/Jasa
Gabungan %
%
(7)

(8)

279,090,508.74

279,090,508.74

52.50%

52.50%

52.50%

93,030,169.58

93,030,169.58

17.50%

17.50%

17.50%

372,120,678.32

372,120,678.32

70.00%

70.00%

70.00%

23,922,043.61

23,922,043.61

4.50%

4.50%

4.50%

39,870,072.68

39,870,072.68

7.50%

7.50%

7.50%

79,740,145.35

79,740,145.35

15.00%

15.00%

15.00%

15,948,029.07
159,480,290.71

15,948,029.07
159,480,290.71

3.00%
30.00%

3.00%
30.00%

3.00%
30.00%

531,600,969.03

100.00%

100.00%

100.00%

531,600,969.03

Namakota/kabupaten, 04 Oktober 2014


Pemimpin
CV. ORIGINAL MITRA TEKNIK

DIO A. HEMAWAN, ST
Direktur

Anda mungkin juga menyukai