HARGA SEWA
NO. PERALATAN SATUAN ALAT KET.
(Rp)
18 Molen hr 250,000
1 Pekerja Hr 80,000
2 Mandor Hr 115,000
10 T u k a n g c a t Hr 100,000
11 K e p . t k . c a t Hr 110,000
12 T u k a n g p l i t u r Hr 100,000
13 T u k a n g g a l i Hr 100,000
14 M a n d o r P i p a Hr 110,000
15 T k . P i p a Hr 100,000
16 P e k e r j a . P i p a Hr 75,000
17 T k . l e i d e n g Hr 100,000
23 Operator Hr 100,000
26 Supir Hr 100,000
28 Mekanik Hr 100,000
KABUPATEN JEPARA
HARGA
BAHAN
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)
I. B A H A N DASAR
1 BATU KALI
Timbun/Sirtu m3 150,000
HARGA
BAHAN
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)
Kalipucang/Clering bh 600
Beton/Muntilan m3 475,000
8 PORTLAND CEMENT
Semen PC kg 1,300
GENTENG METAL
GENTENG SIRAP
3 ASBES GELOMBANG
4 ASBES PLAT
. 100cm X 100 cm X 4 mm bh 55,000
6 SENG PLAT
7 SENG GELOMBANG
III . B A H A N K A Y U
1 JATI
Papan
Kelas II m3 35,518,000
Balok
HARGA
BAHAN
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)
Kelas II m3 34,629,000
Papan
Kelas I m3 16,555,000
Kelas II m3 14,333,000
Balok
Kelas I m3 16,666,000
Kelas II m3 14,444,000
2 KAMPER m3 9,000,000
3 KRUING m3 6,750,000
4 MERANTI m3 6,750,000
5 SENGON/HUTAN m3 2,000,000
6 BENGKIRAI m3 9,500,000
8 DOLKEN
Bambu bt 8,000
9 UKIRAN
PC polos 30 X 30 cm bh 2,950
20 X 20 cm bh 2,950
40 X 40 cm bh 2,950
PC warna 30 X 30 cm bh 6,750
20 X 20 cm bh 6,750
40 X 40 cm bh 6,750
Teraso 30 X 30 cm bh 9,000
20 X 20 cm bh 2,000
20 X 25 cm bh 2,700
6 GRANITILE/HOMOGEN40 x 40 cm bh 32,800
60 x 60 cm bh 37,500
V.BAHAN CETAK
1 BUIS BETON
Ø 20 cm - 100 cm bh 80,000
Ø 30 cm - 100 cm bh 85,000
Ø 60 cm - 100 cm bh 227,400
Ø 80 cm - 100 cm bh 240,000
U 15 cm - 100 cm bh 38,700
U 20 cm - 100 cm bh 46,200
U 30 cm - 100 cm bh 76,200
VI . B A H A N B E S I
1 BESI BETON besi beton polos/Ulir kg 11,500
5 BESI SIKU L
L 50 X 50 X 5 m' 35,800
VII . B A H A N P I P A
1 Pipa PVC AW
VIII . B A H A N L A N G I T - L A N G I T
1 List Kayu Profil Mahoni m' 10,000
3 PLY WOOD
Teak wood
Tripleks
Multipleks
4 KalsiBoard
IX . B A H A N F I N I S H I N G
1 KAYU
Menie kg 33,000
Kuas bh 15,000
2 TEMBOK
Kalkarium kg 6,900
Plamur kg 16,000
3 BESI
Menie kg 30,600
Wallpaper m2 70,000.00
Lem Kg 45,000.00
Underlayer m2 6,000.00
X.BAHAN KACA
1 POLOS 3 mm m2 85,000
5 mm m2 120,000
8 mm m2 135,000
5 mm m2 150,000
8 mm m2 200,000
HARGA
BAHAN
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)
MCB 6 A bh 40,000
MCB 4 A bh 38,000
Isolasi bh 8,000
Outlet TV bh 10,000
T Dus bh 2,000
L Bow bh 3,000
Klem bh 1,000
Espagnoled - bh 32,000
5 URINOIR bh 1,050,000
8 LAIN - LAIN
X V . PAVING BLOCK
1 Blok pafing tebal 6 cm lokal m2 55,300
9 BATACO bh 4,500
XVI. L A I N - L A I N
1 Rel Pintu dorong bh 216,200
9 ASPAL.
10 K A C A
12 LAIN-LAIN
Sabun kg 8,000
Air ltr 20
21 "Accessories"
Grouting m 480,300
Bentonite kg 11,400
Veet/grease kg 33,100
Pembina Tk.1
NIP. 19710905 199803 1 006
DAFTAR HARGA SATUAN PEKERJAAN KONSTRUKSI
KABUPATEN JEPARA
TAHUN ANGGARAN 2021
( Harga sudah termasuk bahan,upah tenaga,alat tahun 2021, Overhead & Profit 12.5%)
(Ket :belum termasuk PPN 10%)
27 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm m' A.5.1.1.33 512,527.50
28 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm m' A.5.1.1.34 309,115.13
Rp 203,793.75
Rp 558,376.88
Rp 1,164,206.25
Rp 17,156.25
Rp 1,244,030
Rp 15,393
Rp 150,975.00
HARGA SATUAN
NO. URAIAN PEKERJAAN SAT KODE
(Rp)
1 Penggalian 1m3 tanah biasa Sedalam 1 m m3 A.2.3.1.1 Rp 70,734.38
Rp 51,149,086.06
Rp 51,149,000.00
panjang pondasi H = 3400 cm
panjang pondasi V = 4250 cm
NO JENIS PEKERJAAN
panjang lebar tinggi volume
1 GALIAN TANAH
76.50 0.8 0.75 45.9 m3
2 PASIR URUG
76.50 0.8 0.1 6.12 m3
3 AANSTAMPING
76.50 0.8 0.15 9.18 m3
4 PAS. BATU KALI
76.50 0.9 0.7 2 24.10 m3
5 URUGAN PONDASI
45.9 6.12 9.18 24.10 6.50 m3
6 BETON SLOOF
76.50 0.15 0.2 2.295 m3
7 PEMBESIAN SLOOF
utama 76.50 0.888 4 271.728 kg
begel 510.00 0.395 0.55 110.7975 kg
382.5255 kg
8 BEKISTING SLOOF
76.50 0.2 2 30.6 m2
round*nmr,-3
DAFTAR ANALISIS HARGA SATUAN PEKERJAAN
(AHSP)
KABUPATEN JEPARA
TAHUN 2021
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
1 A.2.2.1.2 (K3) Pembuatan 1 m2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 meter
A TENAGA
Pekerja L.01 OH 0.2 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.4 100,000.00 40,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.02 115,000.00 2,300.00
60,500.00
B BAHAN
Bambu Btg 1.25 8,000.00 10,000.00
Portland Semen Kg 2.5 1,300.00 3,250.00
Seng Gelombang 3" - 5" Lbr 1.2 55,000.00 66,000.00
Pasir Beton m3 0.005 475,000.00 2,375.00
Koral Beton m3 0.009 325,000.00 2,925.00
Kayu 5/7X4m Kayu Hutan m3 0.072 2,000,000.00 144,000.00
Paku Biasa 2" - 5" Kg 0.06 15,000.00 900.00
Meni Besi Kg 0.45 30,600.00 13,770.00
243,220.00
C PERALATAN
D Jumlah A + B + C 303,720.00
E Overhead & Profit 12.5% 37,965.00
F Harga Satuan Pekerjaan (D+E) 341,685.00
Overhead & Profit
2 A.2.2.1.4 ( K3 ) Pengukuran dan Pemasangan 1m' Bouwplank
A Tenaga
Pekerja L.01 OH 0.1 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.1 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.005 115,000.00 575.00
19,675.00
B Bahan
Kayu Balok 5/7 Randu m3 0.012 1,250,000.00 15,000.00
Paku Biasa 2" - 5" Kg 0.02 15,000.00 300.00
Kayu Papan 3/20 randu m3 0.007 1,250,000.00 8,750.00
24,050.00
C PERALATAN
D Jumlah A + B + C 43,725.00
E Overhead & Profit 12.5% 5,465.63
HARGA JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
F Harga Satuan Pekerjaan (D+E) 49,190.63
HARGA JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
3 A.2.2.1.9 (K3) Pembersihan 1 m2 Lapangan dan Perataan
A Tenaga
Pekerja L.01 OH 0.1 80,000.00 8,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
13,750.00
B Bahan
C PERALATAN
D Jumlah A + B + C 13,750.00
E Overhead & Profit 12.5% 1,718.75
F Harga Satuan Pekerjaan (D+E) 15,468.75
1m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/
8 A.2.2.1.19 tumbuhan diameter < 15cm
A Tenaga
AHSP-SDA Pekerja L.01 OH 0.0750 80,000.00 6,000.00
Mandor L.04 OH 0.0075 115,000.00 862.50
6,862.50
B Bahan
Minyak tanah ltr 0.010 15,000.00 150.00
150.00
C PERALATAN
D Jumlah A + B + C 7,012.50
E Overhead & Profit 12.5% 876.56
F Harga Satuan Pekerjaan (D+E) 7,889.06
HARGA JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
SNI A PERALATAN
7,759.00
B BAHAN
72,000.00
C PERALATAN
18,000.00
D Jumlah A + B + C 97,759.00
SNI A PERALATAN
11,437.50
B BAHAN
C PERALATAN
D Jumlah A + B + C 20,341.63
B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 32.95 1,300.00
Pasir Muntilan m3 0.091 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
2 A.4.4.1.3 Pemasangan 1m2 Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00
B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 26.55 1,300.00
Pasir Muntilan m3 0.093 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 22.2 1,300.00
Pasir Muntilan m3 0.102 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
4 A.4.4.1.5 Pemasangan 1m2 Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00
B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 18.5 1,300.00
Pasir Muntilan m3 0.122 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 14.37 1,300.00
Pasir Muntilan m3 0.04 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
6 A.4.4.1.9 Pemasangan 1m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 11.50 1,300.00
Pasir Muntilan m3 0.043 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
7 A.4.4.1.10 Pemasangan 1m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 9.68 1,300.00
Pasir Muntilan m3 0.045 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
8 A.4.4.1.11 Pemasangan 1m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 8.32 1,300.00
Pasir Muntilan m3 0.049 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 6.50 1,300.00
Pasir Muntilan m3 0.05 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
10 A.4.4.1.23 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Terawang / Roster Buah 30 6,000.00
Portland Semen kg 11 1,300.00
Pasir Muntilan m3 0.035 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 32.95 1,300.00
Pasir Pasang lokal m3 0.091 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
12 A.4.4.1.3.1 Pemasangan 1m2 Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00
B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 26.55 1,300.00
Pasir Pasang lokal m3 0.093 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 22.2 1,300.00
Pasir Pasang lokal m3 0.102 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
14 A.4.4.1.5.1 Pemasangan 1m2 Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00
B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 18.5 1,300.00
Pasir Pasang lokal m3 0.122 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 14.37 1,300.00
Pasir Pasang lokal m3 0.04 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
16 A.4.4.1.9.1 Pemasangan 1m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 11.50 1,300.00
Pasir Pasang lokal m3 0.043 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 9.68 1,300.00
Pasir Pasang lokal m3 0.045 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
18 A.4.4.1.11.1 Pemasangan 1m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 8.32 1,300.00
Pasir Pasang lokal m3 0.049 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 6.50 1,300.00
Pasir Pasang lokal m3 0.05 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
20 A.4.4.1.23.1 Pemasangan 1m2 Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Terawang / Roster Buah 30 6,000.00
Portland Semen kg 11 1,300.00
Pasir Pasang lokal m3 0.035 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 150 600.00
Portland Semen (PC) Kg 32.95 1,300.00
Pasir Muntilan m3 0.091 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
22 A.4.4.1.3.2 Pemasangan 1m2 Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00
B Bahan
Bata Merah Buah 140 600.00
Portland Semen (PC) Kg 26.55 1,300.00
Pasir Muntilan m3 0.093 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 140 600.00
Portland Semen (PC) Kg 22.2 1,300.00
Pasir Muntilan m3 0.102 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
24 A.4.4.1.5.2 Pemasangan 1m2 Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00
B Bahan
Bata Merah Buah 140 600.00
Portland Semen (PC) Kg 18.5 1,300.00
Pasir Muntilan m3 0.122 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 70 600.00
Portland Semen Kg 14.37 1,300.00
Pasir Muntilan m3 0.04 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
26 A.4.4.1.9.2 Pemasangan 1m2 Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Bata Merah Buah 70 600.00
Portland Semen Kg 11.50 1,300.00
Pasir Muntilan m3 0.043 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 70 600.00
Portland Semen Kg 9.68 1,300.00
Pasir Muntilan m3 0.045 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
28 A.4.4.1.11.2 Pemasangan 1m2 Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Bata Merah Buah 70 600.00
Portland Semen Kg 8.32 1,300.00
Pasir Muntilan m3 0.049 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 70 600.00
Portland Semen Kg 6.50 1,300.00
Pasir Muntilan m3 0.05 475,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
30 A.4.4.1.2.3 Pemasangan 1m2 Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00
B Bahan
Bata Merah Buah 140 600.00
Portland Semen (PC) Kg 32.95 1,300.00
Pasir Pasang Lokal m3 0.091 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 140 600.00
Portland Semen (PC) Kg 26.55 1,300.00
Pasir Pasang Lokal m3 0.093 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
32 A.4.4.1.4.3 Pemasangan 1m2 Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00
B Bahan
Bata Merah Buah 140 600.00
Portland Semen (PC) Kg 22.2 1,300.00
Pasir Pasang Lokal m3 0.102 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 140 600.00
Portland Semen (PC) Kg 18.5 1,300.00
Pasir Pasang Lokal m3 0.122 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
34 A.4.4.1.8.3 Pemasangan 1m2 Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Bata Merah Buah 70 600.00
Portland Semen Kg 14.37 1,300.00
Pasir Pasang Lokal m3 0.04 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 70 600.00
Portland Semen Kg 11.50 1,300.00
Pasir Pasang Lokal m3 0.043 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
36 A.4.4.1.10.3 Pemasangan 1m2 Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Bata Merah Buah 70 600.00
Portland Semen Kg 9.68 1,300.00
Pasir Pasang Lokal m3 0.045 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Merah Buah 70 600.00
Portland Semen Kg 8.32 1,300.00
Pasir Pasang Lokal m3 0.049 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
38 A.4.4.1.12.3 Pemasangan 1m2 Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 8PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Bata Merah Buah 70 600.00
Portland Semen Kg 6.50 1,300.00
Pasir Pasang Lokal m3 0.05 200,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Batako buah 15.000 4,500.00
PC kg 15.160 1,300.00
Pasir Pasang muntilan m3 0.364 475,000.00
Besi Angkur Ø 8 mm kg 0.280 11,500.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
40 A.4.4.1.20.1 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP Lokal
A Tenaga
Pekerja L.01 OH 0.300 80,000.00
Tukang Batu L.02 OH 0.100 100,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Batako buah 15.000 4,500.00
PC kg 15.160 1,300.00
Pasir Pasang lokal m3 0.364 200,000.00
Besi Angkur Ø 8 mm kg 0.280 11,500.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Batako buah 15.000 4,500.00
PC kg 12.130 1,300.00
Pasir Pasang muntilan m3 0.388 475,000.00
Besi Angkur Ø 8 mm kg 0.280 11,500.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
42 A.4.4.1.21.1 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP Lokal
A Tenaga
Pekerja L.01 OH 0.300 80,000.00
Tukang Batu L.02 OH 0.100 100,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 115,000.00
B Bahan
Batako buah 15.000 4,500.00
PC kg 12.130 1,300.00
Pasir Pasang lokal m3 0.388 200,000.00
Besi Angkur Ø 8 mm kg 0.280 11,500.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Ringan bh 8.400 7,200.00
Mortar Perekat kg 0.473 2,125.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
B Bahan
Bata Ringan bh 8.400 9,600.00
Mortar Perekat kg 0.063 2,125.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
Rp
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
126,000.00
42,835.00
43,225.00
212,060.00
285,710.00
35,713.75
321,423.75
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
126,000.00
34,515.00
44,175.00
204,690.00
278,340.00
34,792.50
313,132.50
JUMLAH HARGA
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
126,000.00
28,860.00
48,450.00
203,310.00
276,960.00
34,620.00
311,580.00
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
126,000.00
24,050.00
57,950.00
208,000.00
281,650.00
35,206.25
316,856.25
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
63,000.00
18,681.00
19,000.00
100,681.00
137,506.00
17,188.25
154,694.25
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
63,000.00
14,950.00
20,425.00
98,375.00
135,200.00
16,900.00
152,100.00
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
63,000.00
12,584.00
21,375.00
96,959.00
133,784.00
16,723.00
150,507.00
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
63,000.00
10,816.00
23,275.00
97,091.00
133,916.00
16,739.50
150,655.50
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
63,000.00
8,450.00
23,750.00
95,200.00
132,025.00
16,503.13
148,528.13
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
180,000.00
14,300.00
16,625.00
210,925.00
247,750.00
30,968.75
278,718.75
JUMLAH HARGA
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
126,000.00
42,835.00
18,200.00
187,035.00
260,685.00
32,585.63
293,270.63
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
126,000.00
34,515.00
18,600.00
179,115.00
252,765.00
31,595.63
284,360.63
JUMLAH HARGA
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
126,000.00
28,860.00
20,400.00
175,260.00
248,910.00
31,113.75
280,023.75
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
126,000.00
24,050.00
24,400.00
174,450.00
248,100.00
31,012.50
279,112.50
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
63,000.00
18,681.00
8,000.00
89,681.00
126,506.00
15,813.25
142,319.25
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
63,000.00
14,950.00
8,600.00
86,550.00
123,375.00
15,421.88
138,796.88
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
63,000.00
12,584.00
9,000.00
84,584.00
121,409.00
15,176.13
136,585.13
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
63,000.00
10,816.00
9,800.00
83,616.00
120,441.00
15,055.13
135,496.13
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
63,000.00
8,450.00
10,000.00
81,450.00
118,275.00
14,784.38
133,059.38
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
180,000.00
14,300.00
7,000.00
201,300.00
238,125.00
29,765.63
267,890.63
JUMLAH HARGA
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
90,000.00
42,835.00
43,225.00
176,060.00
249,710.00
31,213.75
280,923.75
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
84,000.00
34,515.00
44,175.00
162,690.00
236,340.00
29,542.50
265,882.50
JUMLAH HARGA
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
84,000.00
28,860.00
48,450.00
161,310.00
234,960.00
29,370.00
264,330.00
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
84,000.00
24,050.00
57,950.00
166,000.00
239,650.00
29,956.25
269,606.25
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
42,000.00
18,681.00
19,000.00
79,681.00
116,506.00
14,563.25
131,069.25
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
42,000.00
14,950.00
20,425.00
77,375.00
114,200.00
14,275.00
128,475.00
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
42,000.00
12,584.00
21,375.00
75,959.00
112,784.00
14,098.00
126,882.00
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
42,000.00
10,816.00
23,275.00
76,091.00
112,916.00
14,114.50
127,030.50
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
42,000.00
8,450.00
23,750.00
74,200.00
111,025.00
13,878.13
124,903.13
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
84,000.00
42,835.00
18,200.00
145,035.00
218,685.00
27,335.63
246,020.63
JUMLAH HARGA
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
84,000.00
34,515.00
18,600.00
137,115.00
210,765.00
26,345.63
237,110.63
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
84,000.00
28,860.00
20,400.00
133,260.00
206,910.00
25,863.75
232,773.75
JUMLAH HARGA
48,000.00
20,000.00
2,200.00
3,450.00
73,650.00
84,000.00
24,050.00
24,400.00
132,450.00
206,100.00
25,762.50
231,862.50
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
42,000.00
18,681.00
8,000.00
68,681.00
105,506.00
13,188.25
118,694.25
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
42,000.00
14,950.00
8,600.00
65,550.00
102,375.00
12,796.88
115,171.88
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
42,000.00
12,584.00
9,000.00
63,584.00
100,409.00
12,551.13
112,960.13
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
42,000.00
10,816.00
9,800.00
62,616.00
99,441.00
12,430.13
111,871.13
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
42,000.00
8,450.00
10,000.00
60,450.00
97,275.00
12,159.38
109,434.38
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
67,500.00
19,708.00
172,900.00
3,220.00
263,328.00
300,153.00
37,519.13
337,672.13
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
67,500.00
19,708.00
72,800.00
3,220.00
163,228.00
200,053.00
25,006.63
225,059.63
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
67,500.00
15,769.00
184,300.00
3,220.00
270,789.00
307,614.00
38,451.75
346,065.75
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
67,500.00
15,769.00
77,600.00
3,220.00
164,089.00
200,914.00
25,114.25
226,028.25
JUMLAH HARGA
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
60,480.00
1,005.13
61,485.13
98,310.13
12,288.77
110,598.89
24,000.00
10,000.00
1,100.00
1,725.00
36,825.00
80,640.00
133.88
80,773.88
117,598.88
14,699.86
132,298.73
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
V A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
1 A.4.4.2.3 Pemasangan 1m2 Plesteran 1 Pc : 3 Pp muntilan Tebal 15 mm
A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 7.7760 1,300.00 10,108.80
Pasir Muntilan m3 0.0230 475,000.00 10,925.00
21,033.80
C PERALATAN
D Jumlah A + B + C 63,408.80
E Overhead & Profit 12.5% 7,926.10
F Harga Satuan Pekerjaan (D+E) 71,334.90
20 A.4.4.2.26 Pemasangan 1m2 Finishing Siar Pas.Batu Kali Adukan 1Pc : 2PP Muntilan
A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Pc Kg 6.3400 1,300.00 8,242.00
PP Muntilan m3 0.0120 475,000.00 5,700.00
13,942.00
C PERALATAN
D Jumlah A + B + C 56,317.00
E Overhead & Profit 12.5% 7,039.63
F Harga Satuan Pekerjaan (D+E) 63,356.63
21 A.4.4.2.26.1 Pemasangan 1m2 Finishing Siar Pas.Batu Kali Adukan 1Pc : 2PP Lokal
A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Pc Kg 6.3400 1,300.00 8,242.00
PP Lokal m3 0.0120 200,000.00 2,400.00
10,642.00
C PERALATAN
D Jumlah A + B + C 53,017.00
E Overhead & Profit 12.5% 6,627.13
F Harga Satuan Pekerjaan (D+E) 59,644.13
B Bahan B
Kayu bengkirai m3 1.1000 9,500,000.00
Paku Biasa 2" - 5 " kg 1.2500 15,000.00
Lem Kayu kg 1.0000 12,800.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
2 A.4.6.1.2 Pembuatan & Pemasangan 1 m3 Kosen Pintu & Jendela Kayu kamfer
A Tenaga
Pekerja L.01 OH 6.0000 80,000.00
Tukang Kayu L.02 OH 18.0000 100,000.00
Kepala Tukang L.03 OH 1.8000 110,000.00
Mandor L.04 OH 0.3000 115,000.00
B Bahan
Kayu kamfer m3 1.2000 9,000,000.00
Paku Biasa 2" - 5 " kg 1.2500 15,000.00
Lem Kayu kg 1.0000 12,800.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
3 A.4.6.1.5 Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Jati Kelas 1 TPK
A Tenaga
Pekerja L.01 OH 1.0000 80,000.00
Tukang Kayu L.02 OH 3.0000 100,000.00
Kepala Tukang L.03 OH 0.3000 110,000.00
Mandor L.04 OH 0.0500 115,000.00
B Bahan
Kayu jati Kelas 1(Hara) TPK m3 0.0400 36,740,000.00
Lem Kayu kg 0.0500 12,800.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
3a A.4.6.1.5 a Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Jati Kelas 2 TPK
A Tenaga
Pekerja L.01 OH 1.0000 80,000.00
Tukang Kayu L.02 OH 3.0000 100,000.00
Kepala Tukang L.03 OH 0.3000 110,000.00
Mandor L.04 OH 0.0500 115,000.00
B Bahan
Kayu jati Kelas 2 TPK m3 0.0400 35,518,000.00
Lem Kayu kg 0.0500 12,800.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
3b A.4.6.1.5 b Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Jati Kelas 3 TPK
A Tenaga
Pekerja L.01 OH 1.0000 80,000.00
Tukang Kayu L.02 OH 3.0000 100,000.00
Kepala Tukang L.03 OH 0.3000 110,000.00
Mandor L.04 OH 0.0500 115,000.00
B Bahan
Kayu jati Kelas 3 TPK m3 0.0400 32,296,000.00
Lem Kayu kg 0.0500 12,800.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu kamfer m3 0.0400 9,000,000.00
Lem Kayu kg 0.0500 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
5 A.4.6.1.6 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Jati Kelas 1 TPK
A Tenaga
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
Pekerja L.01 OH 0.8000 80,000.00
Tukang Kayu L.02 OH 2.4000 100,000.00
Kepala Tukang L.03 OH 0.2400 110,000.00
Mandor L.04 OH 0.0400 115,000.00
B Bahan
Kayu jati, papan Kelas 1 TPK m3 0.0240 36,740,000.00
Lem Kayu kg 0.3000 12,800.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
5a A.4.6.1.6 a Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Jati Kelas 2 TPK
A Tenaga
Pekerja L.01 OH 0.8000 80,000.00
Tukang Kayu L.02 OH 2.4000 100,000.00
Kepala Tukang L.03 OH 0.2400 110,000.00
Mandor L.04 OH 0.0400 115,000.00
B Bahan
Kayu jati, papan Kelas 2 TPK m3 0.0240 35,518,000.00
Lem Kayu kg 0.3000 12,800.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
5b A.4.6.1.6 b Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Jati Kelas 3 TPK
A Tenaga
Pekerja L.01 OH 0.8000 80,000.00
Tukang Kayu L.02 OH 2.4000 100,000.00
Kepala Tukang L.03 OH 0.2400 110,000.00
Mandor L.04 OH 0.0400 115,000.00
B Bahan
Kayu jati, papan Kelas 1 TPK m3 0.0240 32,296,000.00
Lem Kayu kg 0.3000 12,800.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
6 A.4.6.1.6.1 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu kamfer
A Tenaga
Pekerja L.01 OH 0.8000 80,000.00
Tukang Kayu L.02 OH 2.4000 100,000.00
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
Kepala Tukang L.03 OH 0.2400 110,000.00
Mandor L.04 OH 0.0400 115,000.00
B Bahan
Kayu kamfer m3 0.0240 9,000,000.00
Lem Kayu kg 0.3000 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
7 A.4.6.1.8 Pembuatan&Pemasangan 1 m2 Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kamfer
A Tenaga
Pekerja L.01 OH 0.7000 80,000.00
Tukang Kayu L.02 OH 2.1000 100,000.00
Kepala Tukang L.03 OH 0.2100 110,000.00
Mandor L.04 OH 0.0350 115,000.00
B Bahan
Kayu Kamfer m3 0.0250 9,000,000.00
Paku Biasa 1/2" - 1" Kg 0.0300 15,000.00
Lem Kayu Ltr 0.5000 15,000.00
Plywood tebal 4 mm uk.90x220cm Lbr 1.0000 80,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kamfer m3 0.0256 9,000,000.00
Paku Biasa 1/2" - 1" Kg 0.0300 15,000.00
Lem Kayu Ltr 0.5000 15,000.00
Plywood tebal 4 mm uk.90x220cm Lbr 1.0000 80,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Bengkirai m3 0.0600 9,500,000.00
Paku Biasa 1/2" - 1" Kg 0.1500 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
F Harga Satuan Pekerjaan (D+E)
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
10 A.4.6.1.11 Pembuatan & Pemasangan 1 m2 Pintu Teakwood Rangkap, Rangka Expose Kayu Bengkirai
A Tenaga
Pekerja L.01 OH 0.8000 80,000.00
Tukang Kayu L.02 OH 2.4000 100,000.00
Kepala Tukang L.03 OH 0.2400 110,000.00
Mandor L.04 OH 0.0400 115,000.00
B Bahan
Kayu Bengkirai m3 0.0250 9,500,000.00
Paku Biasa 1/2" - 1" Kg 0.0300 15,000.00
Lem Kayu kg 0.3000 15,000.00
Teakwood (90 x 220) cm x 4 mm Lbr 1.0000 80,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
11 A.4.6.1.12 Pembuatan&Pemasangan 1 m2 Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Kamfer
A Tenaga
Pekerja L.01 OH 0.8500 80,000.00
Tukang Kayu L.02 OH 2.5500 100,000.00
Kepala Tukang L.03 OH 0.2550 110,000.00
Mandor L.04 OH 0.0430 115,000.00
B Bahan
Kayu Kamfer m3 0.0250 9,000,000.00
Paku Biasa 1/2" - 1" Kg 0.0300 15,000.00
Lem Kayu kg 0.0800 15,000.00
Teakwood (90 x 220) cm x 4 mm Lbr 1.0000 80,000.00
Formika Lbr 0.5000 75,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
12 A.4.6.1.13 Pemasangan 1 m3 Konstruksi Kuda-kuda Konvensional Kayu Bengkirai
A Tenaga
Pekerja L.01 OH 4.0000 80,000.00
Tukang Kayu L.02 OH 12.0000 100,000.00
Kepala Tukang L.03 OH 1.2000 110,000.00
Mandor L.04 OH 0.2000 115,000.00
B Bahan
Kayu Bengkirai m3 1.1000 9,500,000.00
Besi Strip Kg 15.0000 20,200.00
Paku Biasa 2" - 5" Kg 5.6000 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kruing m3 1.1000 6,750,000.00
Besi Strip Kg 15.0000 20,200.00
Paku Biasa 2" - 5" Kg 5.6000 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Bengkirai m3 1.1000 9,500,000.00
Besi Strip Kg 15.0000 20,200.00
Paku Biasa 2" - 5" Kg 3.0000 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
15 A.4.6.1.15.1 Pemasangan konstruksi 1 m3 Gording, Kayu Kruing
A Tenaga
Pekerja L.01 OH 2.4000 80,000.00
Tukang Kayu L.02 OH 7.2000 100,000.00
Kepala Tukang L.03 OH 0.7200 110,000.00
Mandor L.04 OH 0.1200 115,000.00
B Bahan
Kayu Kruing m3 1.1000 6,750,000.00
Besi Strip Kg 15.0000 20,200.00
Paku Biasa 2" - 5" Kg 3.0000 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Bengkirai, Kaso-kaso (5x7) cm m3 0.0140 9,500,000.00
Reng (2x3) cm bengkirai m3 0.0036 9,500,000.00
Paku Biasa 2" - 5" Kg 0.2500 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Bengkirai, Kaso-kaso (5x7) cm m3 0.0140 9,500,000.00
Reng (2x3) cm bengkirai m3 0.0072 9,500,000.00
Paku Biasa 2" - 5" Kg 0.2500 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
B Bahan
Kayu Kruing m3 0.0154 6,750,000.00
Paku Biasa 2" - 5" Kg 0.2000 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Sengon m3 0.0154 2,000,000.00
Paku Biasa 2" - 5" Kg 0.2000 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kruing m3 0.0163 6,750,000.00
Paku Biasa 2" - 5" Kg 0.2500 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
21 A.4.6.1.20.1 Pemasangan 1 m2 Rangka Langit-langit (60x60) cm, kayu Sengon
A Tenaga
Pekerja L.01 OH 0.2000 80,000.00
Tukang Kayu L.02 OH 0.3000 100,000.00
Kepala Tukang L.03 OH 0.0300 110,000.00
Mandor L.04 OH 0.0100 115,000.00
B Bahan
Kayu Sengon m3 0.0163 2,000,000.00
Paku Biasa 2" - 5" Kg 0.2500 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Bengkirai m3 0.0108 9,500,000.00
Paku Biasa 2" - 5" Kg 0.1000 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Bengkirai m3 0.0110 9,500,000.00
Paku Biasa 2" - 5" Kg 0.0500 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
24 A.4.6.1.23 Pemasangan 1 m2 Rangka Dinding Pemisah (60x120) cm Kayu Kruing
A Tenaga
Pekerja L.01 OH 0.1500 80,000.00
Tukang Kayu L.02 OH 0.4500 100,000.00
Kepala Tukang L.03 OH 0.0450 110,000.00
Mandor L.04 OH 0.0080 115,000.00
B Bahan
Kayu Kruing m3 0.0280 6,750,000.00
Paku Biasa 2" - 5" Kg 0.1500 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kruing m3 0.0280 6,750,000.00
Paku Biasa 2" - 5" Kg 0.1500 15,000.00
Teakwood 120 x 240 cm tebal 4mm Lbr 0.8600 80,000.00
Lem Ltr 0.5600 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kruing m3 0.0280 6,750,000.00
Paku Biasa 2" - 5" Kg 0.1500 15,000.00
Plywood 120 x 240 cm tebal 4mm Lbr 0.8600 80,000.00
Lem Ltr 0.5600 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
F Harga Satuan Pekerjaan (D+E)
27 A.4.6.1.26 Pemasangan 1 m2 Dinding Lambriziring dari Papan kayu jati Kelas 1 TPK
A Tenaga
Pekerja L.01 OH 0.6000 80,000.00
Tukang Kayu L.02 OH 1.8000 100,000.00
Kepala Tukang L.03 OH 0.1800 110,000.00
Mandor L.04 OH 0.0300 115,000.00
B Bahan
Kayu Jati Kelas 1 TPK m3 0.0070 36,740,000.00
Paku Biasa 2" - 5" Kg 0.1000 15,000.00
Paku Sekrup 3,5" Kg 0.1500 13,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Bengkirai m3 0.0120 9,500,000.00
Paku Biasa 2" - 5" Kg 0.1500 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kruing m3 0.0120 6,750,000.00
Paku Biasa 2" - 5" Kg 0.1500 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp
30 A.4.6.1.31 Pasang Papan sirip
A Tenaga
SNI Pekerja L.01 OH 0.1000 80,000.00
Tukang Kayu L.02 OH 0.1000 100,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00
Mandor L.04 OH 0.0500 115,000.00
B Bahan
Kayu Kruing m3 0.0050 6,750,000.00
Paku Biasa 2" - 5" Kg 0.0500 15,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA
Rp
560,000.00
2,100,000.00
231,000.00
40,250.00
2,931,250.00
10,450,000.00
18,750.00
12,800.00
10,481,550.00
13,412,800.00
1,676,600.00
15,089,400.00
480,000.00
1,800,000.00
198,000.00
34,500.00
2,512,500.00
10,800,000.00
18,750.00
12,800.00
10,831,550.00
13,344,050.00
1,668,006.25
15,012,056.25
80,000.00
300,000.00
33,000.00
5,750.00
418,750.00
1,469,600.00
640.00
1,470,240.00
1,888,990.00
236,123.75
2,125,113.75
JUMLAH HARGA
Rp
80,000.00
300,000.00
33,000.00
5,750.00
418,750.00
1,420,720.00
640.00
1,421,360.00
1,840,110.00
230,013.75
2,070,123.75
80,000.00
300,000.00
33,000.00
5,750.00
418,750.00
1,291,840.00
640.00
1,292,480.00
1,711,230.00
213,903.75
1,925,133.75
80,000.00
300,000.00
33,000.00
5,750.00
418,750.00
360,000.00
750.00
360,750.00
779,500.00
97,437.50
876,937.50
JUMLAH HARGA
Rp
64,000.00
240,000.00
26,400.00
4,600.00
335,000.00
881,760.00
3,840.00
885,600.00
1,220,600.00
152,575.00
1,373,175.00
64,000.00
240,000.00
26,400.00
4,600.00
335,000.00
852,432.00
3,840.00
856,272.00
1,191,272.00
148,909.00
1,340,181.00
64,000.00
240,000.00
26,400.00
4,600.00
335,000.00
775,104.00
3,840.00
778,944.00
1,113,944.00
139,243.00
1,253,187.00
64,000.00
240,000.00
JUMLAH HARGA
Rp
26,400.00
4,600.00
335,000.00
216,000.00
4,500.00
220,500.00
555,500.00
69,437.50
624,937.50
JUMLAH HARGA
Rp
56,000.00
210,000.00
23,100.00
4,025.00
293,125.00
225,000.00
450.00
7,500.00
80,000.00
312,950.00
606,075.00
75,759.38
681,834.38
64,000.00
240,000.00
26,400.00
4,600.00
335,000.00
230,400.00
450.00
7,500.00
80,000.00
318,350.00
653,350.00
81,668.75
735,018.75
53,600.00
200,000.00
22,000.00
38,525.00
314,125.00
570,000.00
2,250.00
572,250.00
886,375.00
110,796.88
JUMLAH HARGA
Rp
997,171.88
JUMLAH HARGA
Rp
64,000.00
240,000.00
26,400.00
4,600.00
335,000.00
237,500.00
450.00
4,500.00
80,000.00
322,450.00
657,450.00
82,181.25
739,631.25
68,000.00
255,000.00
28,050.00
4,945.00
355,995.00
225,000.00
450.00
1,200.00
80,000.00
37,500.00
344,150.00
700,145.00
87,518.13
787,663.13
JUMLAH HARGA
Rp
320,000.00
1,200,000.00
132,000.00
23,000.00
1,675,000.00
10,450,000.00
303,000.00
84,000.00
10,837,000.00
12,512,000.00
1,564,000.00
14,076,000.00
320,000.00
1,200,000.00
132,000.00
23,000.00
1,675,000.00
7,425,000.00
303,000.00
84,000.00
7,812,000.00
9,487,000.00
1,185,875.00
10,672,875.00
192,000.00
720,000.00
79,200.00
13,800.00
1,005,000.00
10,450,000.00
303,000.00
45,000.00
10,798,000.00
11,803,000.00
1,475,375.00
13,278,375.00
JUMLAH HARGA
Rp
192,000.00
720,000.00
79,200.00
13,800.00
1,005,000.00
7,425,000.00
303,000.00
45,000.00
7,773,000.00
8,778,000.00
1,097,250.00
9,875,250.00
8,000.00
10,000.00
1,100.00
575.00
19,675.00
133,000.00
34,200.00
3,750.00
170,950.00
190,625.00
23,828.13
214,453.13
8,000.00
10,000.00
1,100.00
575.00
19,675.00
133,000.00
68,400.00
3,750.00
205,150.00
224,825.00
28,103.13
252,928.13
JUMLAH HARGA
Rp
12,000.00
30,000.00
3,300.00
8,625.00
53,925.00
103,950.00
3,000.00
106,950.00
160,875.00
20,109.38
180,984.38
12,000.00
30,000.00
3,300.00
8,625.00
53,925.00
30,800.00
3,000.00
33,800.00
87,725.00
10,965.63
98,690.63
16,000.00
30,000.00
3,300.00
1,150.00
50,450.00
110,025.00
3,750.00
113,775.00
164,225.00
20,528.13
184,753.13
JUMLAH HARGA
Rp
16,000.00
30,000.00
3,300.00
1,150.00
50,450.00
32,600.00
3,750.00
36,350.00
86,800.00
10,850.00
97,650.00
8,000.00
20,000.00
2,200.00
575.00
30,775.00
102,600.00
1,500.00
104,100.00
134,875.00
16,859.38
151,734.38
8,000.00
20,000.00
2,200.00
575.00
30,775.00
104,500.00
750.00
105,250.00
136,025.00
17,003.13
153,028.13
JUMLAH HARGA
Rp
12,000.00
45,000.00
4,950.00
920.00
62,870.00
189,000.00
2,250.00
191,250.00
254,120.00
31,765.00
285,885.00
12,000.00
45,000.00
4,950.00
920.00
62,870.00
189,000.00
2,250.00
68,800.00
8,400.00
268,450.00
331,320.00
41,415.00
372,735.00
1,600.00
60,000.00
6,600.00
1,150.00
69,350.00
189,000.00
2,250.00
68,800.00
8,400.00
268,450.00
337,800.00
42,225.00
JUMLAH HARGA
Rp
380,025.00
48,000.00
180,000.00
19,800.00
3,450.00
251,250.00
257,180.00
1,500.00
1,950.00
260,630.00
511,880.00
63,985.00
575,865.00
8,000.00
10,000.00
1,100.00
575.00
19,675.00
114,000.00
2,250.00
116,250.00
135,925.00
16,990.63
152,915.63
8,000.00
10,000.00
1,100.00
575.00
19,675.00
81,000.00
2,250.00
83,250.00
102,925.00
12,865.63
115,790.63
JUMLAH HARGA
Rp
8,000.00
10,000.00
1,100.00
5,750.00
24,850.00
33,750.00
750.00
34,500.00
59,350.00
7,418.75
66,768.75
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
D Jumlah A + B + C 193,725.00
E Overhead & Profit 12.5% 24,215.63
F Harga Satuan Pekerjaan (D+E) 217,940.63
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
21 A.4.1.1.37 Pemasangan 1m2 bekisting untuk permukaan beton biasa dengan kayu randu tebal 2 cm
A Tenaga
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.500 100,000.00 50,000.00
Kepala Tukang L.03 OH 0.050 110,000.00 5,500.00
Mandor L.04 OH 0.010 115,000.00 1,150.00
72,650.00
B Bahan
kayu randu tebal 2 cm m3 0.022 1,250,000.00 27,500.00
Paku Biasa 2" - 5" Kg 0.400 15,000.00 6,000.00
33,500.00
C PERALATAN
D Jumlah A + B + C 106,150.00
E Overhead & Profit 12.5% 13,268.75
F Harga Satuan Pekerjaan (D+E) 119,418.75
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
D Jumlah A + B + C 55,225.00
E Overhead & Profit 12.5% 6,903.13
F Harga Satuan Pekerjaan (D+E) 62,128.13
D Jumlah A + B + C 135,250.00
E Overhead & Profit 12.5% 16,906.25
F Harga Satuan Pekerjaan (D+E) 152,156.25
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
D Jumlah A + B + C 191,250.00
E Overhead & Profit 12.5% 23,906.25
F Harga Satuan Pekerjaan (D+E) 215,156.25
D Jumlah A + B + C 206,950.00
E Overhead & Profit 12.5% 25,868.75
F Harga Satuan Pekerjaan (D+E) 232,818.75
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
D Jumlah A + B + C 134,600.00
E Overhead & Profit 12.5% 16,825.00
F Harga Satuan Pekerjaan (D+E) 151,425.00
D Jumlah A + B + C 184,100.00
E Overhead & Profit 12.5% 23,012.50
F Harga Satuan Pekerjaan (D+E) 207,112.50
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
D Jumlah A + B + C 92,662.50
E Overhead & Profit 12.5% 11,582.81
F Harga Satuan Pekerjaan (D+E) 104,245.31
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
A Tenaga
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang Kayu L.02 OH 0.070 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.007 110,000.00 770.00
Mandor L.04 OH 0.004 115,000.00 460.00
10,630.00
B Bahan
B Bahan
Tripleks (4 mm) Lbr 0.375 65,000.00 24,375.00
Paku Tripleks Kg 0.030 15,000.00 450.00
24,825.00
C PERALATAN
D Jumlah A + B + C 44,500.00
E Overhead & Profit 12.5% 5,562.50
F Harga Satuan Pekerjaan (D+E) 50,062.50
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
3 A.4.5.1.6 Pemasangan 1m2 Langit-langit Lambriziring Kayu Jati, tebal 6 mm
A Tenaga
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang Kayu L.02 OH 0.800 100,000.00 80,000.00
Kepala Tukang L.03 OH 0.080 110,000.00 8,800.00
Mandor L.04 OH 0.040 115,000.00 4,600.00
157,400.00
B Bahan
Kayu Jati,Papan kelas 3 TPK m3 0.015 32,296,000.00 484,440.00
Paku Kg 0.010 15,000.00 150.00
484,590.00
C PERALATAN
D Jumlah A + B + C 641,990.00
E Overhead & Profit 12.5% 80,248.75
F Harga Satuan Pekerjaan (D+E) 722,238.75
B Bahan
C PERALATAN
D Jumlah A + B + C 29,055.00
B Bahan
Besi Baja IWF kg 1.1500 15,000.00 17,250.00
17,250.00
C PERALATAN
D Jumlah A + B + C 29,055.00
A Tenaga
18,685.00
B Bahan
Solar Liter 1.0000 5,900.00 5,900.00
C PERALATAN
D Jumlah A + B + C 25,585.00
3 A.4.2.1.4 Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku
A TENAGA
Pekerja L.01 OH 1.05 80,000.00 84,000.00
Tukang las biasa L.03 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.11 110,000.00 11,550.00
Mandor L.04 OH 0.05 115,000.00 5,980.00
206,530.00
B BAHAN
Besi siku L 30.30.3 Kg 15.00 35,800.00 537,000.00
Besi pelat baja Kg 32.80 20,200.00 662,560.00
Kawat las Kg 0.05 900.00 45.00
1,199,605.00
C PERALATAN
D Jumlah A + B + C 1,406,135.00
E Overhead & Profit 12.5% 175,766.88
F Harga Satuan Pekerjaan (D+E) 1,581,901.88
D Jumlah A + B + C 16,680.00
E Overhead & Profit 12.5% 2,085.00
F Harga Satuan Pekerjaan (D+E) 18,765.00
A Tenaga
Pekerja L.01 OH 1.2000 80,000.00 96,000.00
Tukang Besi L.02 OH 1.2000 100,000.00 120,000.00
229,890.00
B Bahan
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
D Jumlah A + B + C 579,890.00
E Overhead & Profit 12.5% 72,486.25
86,570.00
B Bahan
Pintu Lipat m2 1.0000 434,000.00 434,000.00
434,000.00
C PERALATAN
D Jumlah A + B + C 520,570.00
E Overhead & Profit 12.5% 65,071.25
F Harga Satuan Pekerjaan (D+E) 585,641.25
A Tenaga
196,750.00
B Bahan
D Jumlah A + B + C 560,750.00
E Overhead & Profit 12.5% 70,093.75
A Tenaga
Pekerja L.01 OH 0.0430 80,000.00 3,440.00
Tukang Besi L.02 OH 0.0430 100,000.00 4,300.00
Kepala Tukang L.03 OH 0.0043 110,000.00 473.00
8,454.50
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
B Bahan
Profil Allumunium 4 " m' 1.1000 103,200.00 113,520.00
Skrup Fixer buah 2.0000 1,600.00 3,200.00
C PERALATAN
D Jumlah A + B + C 126,524.50
16,718.00
B Bahan
Profil Allumunium m' 4.4000 103,200.00 454,080.00
Allumunium Strip m' 14.6000 34,300.00 500,780.00
954,860.00
C PERALATAN
D Jumlah A + B + C 971,578.00
E Overhead & Profit 12.5% 121,447.25
A Tenaga
Pekerja L.01 OH 0.0850 80,000.00 6,800.00
B Bahan
Pintu Allumunium m' 4.4000 103,200.00 454,080.00
Sealant tube 0.2700 22,500.00 6,075.00
460,155.00
C PERALATAN
D Jumlah A + B + C 477,020.00
E Overhead & Profit 12.5% 59,627.50
F Harga Satuan Pekerjaan (D+E) 536,647.50
B Bahan
C PERALATAN
D Jumlah A + B + C 193,040.00
E Overhead & Profit 12.5% 24,130.00
13 A.4.2.1.19 Pemasangan 1m' Talang 1/2 Lingkaran Ø 15 cm, Seng Plat BJLS 30 Lebar 45 cm
A Tenaga
46,220.00
B Bahan
Seng Plaat Lbr 1.0500 25,000.00 26,250.00
Paku Biasa 1 - 2,5 cm Kg 0.0100 15,000.00 150.00
Besi strip Kg 0.5000 20,200.00 10,100.00
36,500.00
C PERALATAN
D Jumlah A + B + C 82,720.00
D Jumlah A + B + C 105,495.00
E Overhead & Profit 12.5% 13,186.88
F Harga Satuan Pekerjaan (D+E) 118,681.88
15 A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.0,6 mm, modul 60 x 60 cm, plafon
A Tenaga
Pekerja L.01 OH 0.3500 80,000.00 28,000.00
Tukang Besi L.02 OH 0.3500 100,000.00 35,000.00
68,920.00
B Bahan
Rangka metal hollow 40.40.0.6 mm M1 4.0000 11,300.00 45,200.00
C PERALATAN
D Jumlah A + B + C 125,420.00
B Bahan
Kunci Tanam Biasa Buah 1.0000 77,200.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit
2 A.4.6.2.3 Pemasangan Kunci Kamar Mandi
A Tenaga
Pekerja L.01 OH 0.0050 80,000.00
Tukang Kayu L.02 OH 0.5000 100,000.00
Kepala Tukang L.03 OH 0.0500 110,000.00
Mandor L.04 OH 0.0030 115,000.00
B Bahan
Kunci Tanam Kamar Mandi Buah 1.0000 46,400.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
3 A.4.6.2.4 Pemasangan Kunci Selinder
A Tenaga
Pekerja L.01 OH 0.0050 80,000.00
Tukang Kayu L.02 OH 0.5000 100,000.00
Kepala Tukang L.03 OH 0.0500 110,000.00
Mandor L.04 OH 0.0030 115,000.00
B Bahan
Kunci Selinder Buah 1.0000 77,200.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Engsel pintu Buah 1.0000 26,100.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
5 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu
A Tenaga
Pekerja L.01 OH 0.0100 80,000.00
Tukang Kayu L.02 OH 0.1000 100,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00
Mandor L.04 OH 0.0005 115,000.00
B Bahan
Engsel Jendela Buah 1.0000 18,500.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Engsel Angin Buah 1.0000 19,800.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
7 A.4.6.2.9 Pemasangan Kait Angin
A Tenaga
Pekerja L.01 OH 0.0150 80,000.00
Tukang Kayu L.02 OH 0.1500 100,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00
Mandor L.04 OH 0.0080 115,000.00
B Bahan
Kait Angin Buah 1.0000 6,900.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Door Closer Buah 1.0000 118,400.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
9 A.4.6.2.11 Pemasangan Kunci Selot
A Tenaga
Pekerja L.01 OH 0.0200 80,000.00
Tukang Kayu L.02 OH 0.2000 100,000.00
Kepala Tukang L.03 OH 0.0200 110,000.00
Mandor L.04 OH 0.0010 115,000.00
B Bahan
Kunci Selot Buah 1.0000 8,900.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Door Stop Buah 1.0000 35,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
11 A.4.6.2.14 Pemasangan Rel Pintu Dorong
A Tenaga
Pekerja L.01 OH 0.0600 80,000.00
Tukang Kayu L.02 OH 0.6000 100,000.00
Kepala Tukang L.03 OH 0.0600 110,000.00
Mandor L.04 OH 0.0030 115,000.00
B Bahan
Rel Pintu Dorong Buah 1.0000 216,200.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kaca tebal 3mm m2 1.1000 85,000.00
Sealant Kg 0.0500 22,500.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
13 A.4.6.2.17 Pemasangan Kaca tebal 5 mm
A Tenaga
Pekerja L.01 OH 0.0150 80,000.00
Tukang Kayu L.02 OH 0.1500 100,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00
Mandor L.04 OH 0.0008 115,000.00
B Bahan
Kaca tebal 5mm m2 1.1000 120,000.00
Sealant Kg 0.0500 22,500.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kaca Cermin m2 1.1000 170,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
B BAHAN
Kaca wireglassed 5 900,000.00
mm m2 1.10
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B BAHAN
1,430,000.00
Kaca patri 5mm m2 1.10
22,500.00
Sealant Kg 0.05
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA
Rp
800.00
50,000.00
5,500.00
575.00
56,875.00
77,200.00
77,200.00
134,075.00
16,759.38
150,834.38
400.00
50,000.00
5,500.00
345.00
56,245.00
46,400.00
46,400.00
102,645.00
12,830.63
115,475.63
JUMLAH HARGA
Rp
400.00
50,000.00
5,500.00
345.00
56,245.00
77,200.00
77,200.00
133,445.00
16,680.63
150,125.63
1,200.00
15,000.00
1,650.00
92.00
17,942.00
26,100.00
26,100.00
44,042.00
5,505.25
49,547.25
JUMLAH HARGA
Rp
800.00
10,000.00
1,100.00
57.50
11,957.50
18,500.00
18,500.00
30,457.50
3,807.19
34,264.69
8,000.00
20,000.00
2,200.00
57.50
30,257.50
19,800.00
19,800.00
50,057.50
6,257.19
56,314.69
JUMLAH HARGA
Rp
1,200.00
15,000.00
1,650.00
920.00
18,770.00
6,900.00
6,900.00
25,670.00
3,208.75
28,878.75
4,000.00
50,000.00
5,500.00
345.00
59,845.00
118,400.00
118,400.00
178,245.00
22,280.63
200,525.63
JUMLAH HARGA
Rp
1,600.00
20,000.00
2,200.00
115.00
23,915.00
8,900.00
8,900.00
32,815.00
4,101.88
36,916.88
800.00
10,000.00
1,100.00
57.50
11,957.50
35,000.00
35,000.00
46,957.50
5,869.69
52,827.19
JUMLAH HARGA
Rp
4,800.00
60,000.00
6,600.00
345.00
71,745.00
216,200.00
216,200.00
287,945.00
35,993.13
323,938.13
1,200.00
15,000.00
1,650.00
86.25
17,936.25
93,500.00
1,125.00
94,625.00
112,561.25
14,070.16
126,631.41
JUMLAH HARGA
Rp
1,200.00
15,000.00
1,650.00
86.25
17,936.25
132,000.00
1,125.00
133,125.00
151,061.25
18,882.66
169,943.91
1,200.00
15,000.00
1,650.00
86.25
17,936.25
187,000.00
187,000.00
204,936.25
25,617.03
230,553.28
JUMLAH HARGA
Rp
1,200.00
15,000.00
1,650.00
920.00
18,770.00
990,000.00
1,008,770.00
1,027,540.00
128,442.50
1,155,982.50
6,000.00
15,000.00
1,650.00
460.00
23,110.00
1,573,000.00
1,125.00
1,574,125.00
1,597,235.00
199,654.38
1,796,889.38
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
D Jumlah A + B + C 89,098.50
E Overhead & Profit 12.5% 11,137.31
F Harga Satuan Pekerjaan (D+E) 100,235.81
D Jumlah A + B + C 115,072.50
E Overhead & Profit 12.5% 14,384.06
F Harga Satuan Pekerjaan (D+E) 129,456.56
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
D Jumlah A + B + C 144,810.00
E Overhead & Profit 12.5% 18,101.25
F Harga Satuan Pekerjaan (D+E) 162,911.25
D Jumlah A + B + C 195,930.00
E Overhead & Profit 12.5% 24,491.25
F Harga Satuan Pekerjaan (D+E) 220,421.25
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
SNI A Tenaga
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 110,000.00 3,850.00
Mandor L.04 OH 0.0350 115,000.00 4,025.00
98,875.00
B Bahan
Ubin Keramik 40 x 40 cm Buah 6.6300 8,571.43 56,828.57
Portland Semen Kg 9.8000 1,300.00 12,740.00
Semen Warna Kg 1.3000 12,000.00 15,600.00
Pasir Beton/Muntilan m3 0.0450 475,000.00 21,375.00
106,543.57
C PERALATAN
D Jumlah A + B + C 205,418.57
E Overhead & Profit 12.5% 25,677.32
F Harga Satuan Pekerjaan (D+E) 231,095.89
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
SNI A Tenaga
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 110,000.00 3,850.00
Mandor L.04 OH 0.0350 115,000.00 4,025.00
98,875.00
B Bahan
Ubin Keramik 40 x 40 cm putih Buah 6.6300 7,857.14 52,092.86
Portland Semen Kg 9.8000 1,300.00 12,740.00
Semen Warna Kg 1.3000 12,000.00 15,600.00
Pasir Beton/Muntilan m3 0.0450 475,000.00 21,375.00
101,807.86
C PERALATAN
D Jumlah A + B + C 200,682.86
E Overhead & Profit 12.5% 25,085.36
F Harga Satuan Pekerjaan (D+E) 225,768.21
D Jumlah A + B + C 206,755.00
E Overhead & Profit 12.5% 25,844.38
F Harga Satuan Pekerjaan (D+E) 232,599.38
D Jumlah A + B + C 45,660.00
E Overhead & Profit 12.5% 5,707.50
F Harga Satuan Pekerjaan (D+E) 51,367.50
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
A Tenaga
B Bahan
C PERALATAN
D Jumlah A + B + C
A Tenaga
Pekerja L.01 OH 0.1500 80,000.00
B Bahan
C PERALATAN
D Jumlah A + B + C
B Bahan
Sabun Kg 0.0500 8,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
4 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
A Tenaga
Pekerja L.01 OH 0.0700 80,000.00
Tukang Cat L.02 OH 0.0090 100,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00
Mandor L.04 OH 0.0030 115,000.00
B Bahan
Cat Menie kg 0.2000 33,000.00
Plamuur kg 0.1500 30,000.00
Cat Dasar kg 0.1700 33,500.00
Cat Penutup kg 0.2600 55,000.00
Kuas bh 0.0100 15,000.00
Pengencer kg 0.0300 20,000.00
Amplas lbr 0.2000 9,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
5 A.4.7.1.5 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup)
A Tenaga
Pekerja L.01 OH 0.0700 80,000.00
Tukang Cat L.02 OH 0.1050 100,000.00
Kepala Tukang L.03 OH 0.0040 110,000.00
Mandor L.04 OH 0.0030 115,000.00
B Bahan
Cat Menie kg 0.2000 33,000.00
Plamuur kg 0.1500 30,000.00
Cat Dasar kg 0.1700 33,500.00
Cat Penutup kg 0.3500 55,000.00
Kuas bh 0.0100 15,000.00
Pengencer kg 0.0300 20,000.00
Amplas lbr 0.2000 9,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
6 A.4.7.1.6 Pelaburan Bidang Kayu dg Teak Oil
A Tenaga
Pekerja L.01 OH 0.0400 80,000.00
Tukang Cat L.02 OH 0.0630 100,000.00
Kepala Tukang L.03 OH 0.0630 110,000.00
Mandor L.04 OH 0.0030 115,000.00
B Bahan
Teak Oil Ltr 0.3600 42,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Politur Ltr 0.1500 16,900.00
Spiritus Ltr 0.3720 12,000.00
Ampelas Lbr 2.0000 9,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
8 A.4.7.1.8 Pelaburan Bidang Kayu dg Cat Residu & Ter
A Tenaga
Pekerja L.01 OH 0.1000 80,000.00
Mandor L.04 OH 0.0060 115,000.00
B Bahan
Residu atau Ter Ltr 0.3500 3,400.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Vernis Ltr 0.1500 27,900.00
Dempul Ltr 0.0500 30,000.00
Ampelas Lbr 0.1000 9,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
10 A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Decolite
A Tenaga
Pekerja L.01 OH 0.0200 80,000.00
Tukang Cat L.02 OH 0.0630 100,000.00
Kepala Tukang L.03 OH 0.0063 110,000.00
Mandor L.04 OH 0.0030 115,000.00
B Bahan
Plamir Kg 0.1000 16,000.00
Cat Dasar Kg 0.1000 19,000.00
Cat Penutup 2 kali Kg 0.2600 50,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
11 A.4.7.1.10.1 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex dalam ruangan
A Tenaga
Pekerja L.01 OH 0.0200 80,000.00
Tukang Cat L.02 OH 0.0630 100,000.00
Kepala Tukang L.03 OH 0.0063 110,000.00
Mandor L.04 OH 0.0030 115,000.00
B Bahan
Plamir Kg 0.1000 16,000.00
Cat Dasar Kg 0.1000 19,000.00
Cat Penutup 2 kali Kg 0.2600 75,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
12 A.4.7.1.10.2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex luar ruangan
A Tenaga
Pekerja L.01 OH 0.0200 80,000.00
Tukang Cat L.02 OH 0.0630 100,000.00
Kepala Tukang L.03 OH 0.0063 110,000.00
Mandor L.04 OH 0.0030 115,000.00
B Bahan
Plamir Kg 0.1000 16,000.00
Cat Dasar Kg 0.1000 19,000.00
Cat Penutup 2 kali Kg 0.2600 115,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Cat Dasar Kg 0.1200 19,000.00
Cat Penutup 2 kali Kg 0.1800 50,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
14 A.4.7.1.11.1 Pengecatan Tembok Lama dengan Mowilex dalam ruangan
A Tenaga
Pekerja L.01 OH 0.0280 80,000.00
Tukang Cat L.02 OH 0.0420 100,000.00
Kepala Tukang L.03 OH 0.0042 110,000.00
Mandor L.04 OH 0.0030 115,000.00
B Bahan
Cat Dasar Kg 0.1200 19,000.00
Cat Penutup 2 kali Kg 0.1800 75,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Cat Dasar Kg 0.1200 19,000.00
Cat Penutup 2 kali Kg 0.1800 115,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
B BAHAN
70,000.00
Wall paper m2 1.20
45,000.00
Lem Kg 0.20
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Meni Besi Kg 0.1000 30,600.00
Perekat / Lem Kg 0.0100 35,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
18 A.4.7.1.22 Pengecatan 1 m2 permukaan Besi 3x
SNI A Tenaga
Pekerja L.01 OH 0.0500 80,000.00
Tukang Cat L.02 OH 0.0750 100,000.00
Kepala Tukang L.03 OH 0.0075 110,000.00
Mandor L.04 OH 0.0025 115,000.00
B Bahan
Cat Kg 0.2600 55,000.00
Pengencer L 0.1740 20,000.00
Meni Kg 0.0750 30,600.00
Amplas Bh 0.2000 9,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Cat Kg 0.2600 55,000.00
Pengencer L 0.1740 20,000.00
Amplas Bh 0.2000 9,000.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
B Bahan
Cat Waterproof sekualitas No Drop Kg 0.3500 50,000.00
C PERALATAN
D Jumlah A + B + C
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
JUMLAH HARGA
Rp
12,000.00
345.00
12,345.00
1,160.00
1,160.00
13,505.00
1,688.13
15,193.13
12,000.00
345.00
12,345.00
400.00
400.00
12,745.00
1,593.13
14,338.13
12,000.00
920.00
12,920.00
400.00
400.00
13,320.00
1,665.00
14,985.00
JUMLAH HARGA
Rp
5,600.00
900.00
660.00
345.00
7,505.00
6,600.00
4,500.00
5,695.00
14,300.00
150.00
600.00
1,800.00
33,645.00
41,150.00
5,143.75
46,293.75
5,600.00
10,500.00
440.00
345.00
16,885.00
6,600.00
4,500.00
5,695.00
19,250.00
150.00
600.00
1,800.00
38,595.00
55,480.00
6,935.00
62,415.00
JUMLAH HARGA
Rp
3,200.00
6,300.00
6,930.00
345.00
16,775.00
15,120.00
15,120.00
31,895.00
3,986.88
35,881.88
3,200.00
6,000.00
1,760.00
345.00
11,305.00
2,535.00
4,464.00
18,000.00
24,999.00
36,304.00
4,538.00
40,842.00
JUMLAH HARGA
Rp
8,000.00
690.00
8,690.00
1,190.00
1,190.00
9,880.00
1,235.00
11,115.00
12,800.00
16,000.00
1,760.00
345.00
30,905.00
4,185.00
1,500.00
900.00
6,585.00
37,490.00
4,686.25
42,176.25
JUMLAH HARGA
Rp
1,600.00
6,300.00
693.00
345.00
8,938.00
1,600.00
1,900.00
13,000.00
16,500.00
25,438.00
3,179.75
28,617.75
p.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex dalam ruangan
1,600.00
6,300.00
693.00
345.00
8,938.00
1,600.00
1,900.00
19,500.00
23,000.00
31,938.00
3,992.25
35,930.25
JUMLAH HARGA
Rp
p.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex luar ruangan
1,600.00
6,300.00
693.00
345.00
8,938.00
1,600.00
1,900.00
29,900.00
33,400.00
42,338.00
5,292.25
47,630.25
2,240.00
4,200.00
462.00
345.00
7,247.00
2,280.00
9,000.00
11,280.00
18,527.00
2,315.88
20,842.88
JUMLAH HARGA
Rp
2,240.00
4,200.00
462.00
345.00
7,247.00
2,280.00
13,500.00
15,780.00
23,027.00
2,878.38
25,905.38
2,240.00
4,200.00
462.00
345.00
7,247.00
2,280.00
20,700.00
22,980.00
30,227.00
3,778.38
34,005.38
JUMLAH HARGA
Rp
1,600.00
20,000.00
2,200.00
287.50
24,087.50
84,000.00
9,000.00
93,000.00
117,087.50
14,635.94
131,723.44
1,600.00
20,000.00
2,200.00
287.50
24,087.50
3,060.00
350.00
3,410.00
27,497.50
3,437.19
30,934.69
JUMLAH HARGA
Rp
4,000.00
7,500.00
825.00
287.50
12,612.50
14,300.00
3,480.00
2,295.00
1,800.00
21,875.00
34,487.50
4,310.94
38,798.44
4,000.00
7,500.00
825.00
287.50
12,612.50
14,300.00
3,480.00
1,800.00
19,580.00
32,192.50
4,024.06
36,216.56
1,600.00
6,300.00
693.00
345.00
8,938.00
17,500.00
17,500.00
26,438.00
JUMLAH HARGA
Rp
3,304.75
29,742.75
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
XV A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA
1 A.8.4.1.1 Pemasangan 1 m pipa PVC Ø 50 mm (2")
A TENAGA
Pekerja L.01 OH 0.081 75,000.00 6,075.00
Tukang pipa L.02 OH 0.041 100,000.00 4,100.00
Mandor L.04 OH 0.008 110,000.00 880.00
11,055.00
B BAHAN
Pipa PVC Ø 50 mm m 1.000 36,800.00 36,800.00
36,800.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.006 -
-
D Jumlah A + B + C 47,855.00
E Overhead & Profit 12.5% 5,981.88
F Harga Satuan Pekerjaan (D+E) 53,836.88
9 A.8.4.1.80 Biaya 1 m' pemasangan pipa PVC Ø 25 mm (galian 0,25m x 0,3m + Bahan)
Galian tanah keras m3 0.075 94,140.00 7,060.50
Urugan tanah kembali m3 0.065 17,156.25 1,115.16
Buangan sisa galian m3 0.010 30,993.75 309.94
Pemasangan Pipa 1.000 21,978.41 21,978.41
Harga Satuan Pekerjaan 30,464.00
10 A.8.4.1.81 Biaya 1 m' pemasangan pipa PVC Ø 40 mm (galian 0,25m x 0,4m + Bahan)
Galian tanah keras m3 0.100 94,140.00 9,414.00
Urugan tanah kembali m3 0.080 17,156.25 1,372.50
Buangan sisa galian m3 0.020 30,993.75 619.88
Pemasangan Pipa 1.000 37,631.25 37,631.25
Harga Satuan Pekerjaan 49,037.63
11 A.8.4.1.82 Biaya 1 m' pemasangan pipa PVC Ø 50 mm (galian 0,25m x 0,5m + Bahan)
Galian tanah keras m3 0.125 94,140.00 11,767.50
Urugan tanah kembali m3 0.095 17,156.25 1,629.84
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
Buangan sisa galian m3 0.030 30,993.75 929.81
Pemasangan Pipa 1.000 53,836.88 53,836.88
Harga Satuan Pekerjaan 68,164.03
12 A.8.4.1.83 Biaya 1 m' pemasangan pipa PVC Ø 75 mm (galian 0,25m x 0,6m + Bahan)
Galian tanah keras m3 0.150 94,140.00 14,121.00
Urugan tanah kembali m3 0.120 17,156.25 2,058.75
Buangan sisa galian m3 0.030 30,993.75 929.81
Pemasangan Pipa 1.000 98,145.00 98,145.00
Harga Satuan Pekerjaan 115,254.56
13 A.8.4.1.84 Biaya 1 m' pemasangan pipa PVC Ø 100 mm (galian 0,30m x 1,00m + Bahan)
Galian tanah keras m3 0.300 94,140.00 28,242.00
Urugan tanah kembali m3 0.265 17,156.25 4,546.41
Buangan sisa galian m3 0.035 30,993.75 1,084.78
Pemasangan Pipa 1.000 142,295.63 142,295.63
Harga Satuan Pekerjaan 176,168.81
14 A.8.4.1.85 Biaya 1 m' pemasangan pipa HDPE OD 63 mm (galian 0,25m x 0,5m + Bahan)
Galian tanah keras m3 0.125 94,140.00 11,767.50
Urugan tanah kembali m3 0.095 17,156.25 1,629.84
Buangan sisa galian m3 0.030 30,993.75 929.81
Pemasangan Pipa 1.000 67,843.13 67,843.13
Harga Satuan Pekerjaan 82,170.28
15 A.8.4.1.86 Biaya 1 m' pemasangan pipa HDPE OD 75 mm (galian 0,25m x 0,6m + Bahan)
Galian tanah keras m3 0.150 94,140.00 14,121.00
Urugan tanah kembali m3 0.120 17,156.25 2,058.75
Buangan sisa galian m3 0.030 30,993.75 929.81
Pemasangan Pipa 1.000 93,173.06 93,173.06
Harga Satuan Pekerjaan 110,282.63
16 A.8.4.1.87 Biaya 1 m' pemasangan pipa HDPE OD 90 mm (galian 0,25m x 0,70m + Bahan)
Galian tanah keras m3 0.175 94,140.00 16,474.50
Urugan tanah kembali m3 0.140 17,156.25 2,401.88
Buangan sisa galian m3 0.035 30,993.75 1,084.78
Pemasangan Pipa 1.000 132,851.25 132,851.25
Harga Satuan Pekerjaan 152,812.41
A Tenaga
100,000.00
B Bahan
134,900.00
C PERALATAN
D Jumlah A + B + C 234,900.00
A Tenaga
100,000.00
B Bahan
119,250.00
C PERALATAN
D Jumlah A + B + C 219,250.00
A Tenaga
Upah L.01 % 100% 100,000.00 100,000.00
100,000.00
B Bahan
Pipa Listrik 5/8" btg 3.000 4,000.00 12,000.00
93,250.00
C PERALATAN
D Jumlah A + B + C 193,250.00
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
E Overhead & Profit 12.5% 24,156.25
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Crew pengeboran Hari 4.00 x 1.00 50,000.00
4 Pengemudi Hari 2.00 x 2.00 40,000.00
II. PERALATAN
1 Sewa kendaraan Hari 2.00 x 2.00 250,000.00
angkut ( truk )
JUMLAH
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 70.00 x 1.00 5,900.00
2 Olie mesin Ltr 5.00 x 1.00 35,300.00
3 Veet Kg 2.00 x 1.00 33,100.00
4 Bentonite Kg 40.00 x 1.00 11,400.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 400,000.00
JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
An.3 Jenis pekerjaan :Pemboran pilot hole diameter 6", 50 -- 100 m
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 75.00 x 1.00 5,900.00
2 Olie mesin Ltr 5.00 x 1.00 35,300.00
3 Veet Kg 2.00 x 1.00 33,100.00
4 Bentonite Kg 50.00 x 1.00 11,400.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
An.4 Jenis pekerjaan :Pemboran pilot hole diameter 6", 100 -- 150 m
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 85.00 x 1.00 5,900.00
2 Olie mesin Ltr 6.00 x 1.00 35,300.00
3 Veet Kg 3.00 x 1.00 33,100.00
4 Bentonite Kg 60.00 x 1.00 11,400.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
An.5 Jenis pekerjaan : Pekerjaan reaming, 0 -- 65 m
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 60.00 x 1.00 5,900.00
2 Olie mesin Ltr 4.00 x 1.00 35,300.00
3 Veet Kg 2.00 x 1.00 33,100.00
4 Bentonite Kg 40.00 x 1.00 11,400.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 75.00 x 1.00 5,900.00
2 Olie mesin Ltr 6.00 x 1.00 35,300.00
3 Veet Kg 3.00 x 1.00 33,100.00
4 Bentonite Kg 55.00 x 1.00 11,400.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
An.7 Jenis pekerjaan : Electric logging
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Operator pemboran Hari 1.00 x 1.00 50,000.00
4 Crew pengeboran Hari 2.00 x 1.00 50,000.00
II. PERALATAN
1 Recorder paper Unit 1.00 x 1.00 20,000.00
2 Alat tulis Unit 1.00 x 1.00 15,000.00
III. PERALATAN
Mesin peralatan logging Unit 1.00 x 1.00 700,000.00
Tranportasi peralatan logging Unit 1.00 x 1.00 150,000.00
JUMLAH
1 HARI RATA-RATA 50 M' ----> JADI PER METER
An.8 Jenis pekerjaan : Pengadaan dan pemasangan pipa jambang diametr 8"
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 120.00 x 1.00 5,900.00
2 Olie mesin Ltr 3.00 x 1.00 35,300.00
3 Veet Kg 2.00 x 1.00 33,100.00
4 Kawat las Btg 120.00 x 1.00 900.00
Pipa jambang diameter 8" Mtr 60.00 x 440,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00
JUMLAH
1 HARI RATA-RATA 60 M' ----> JADI PER METER
DIBULATKAN
An.9 Jenis pekerjaan : Pengadaan dan pemasangan pipa buta diametr 6"
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00
2 Olie mesin Ltr 1.00 x 35,300.00
3 Veet Kg 0.60 x 33,100.00
4 Kawat las Btg 60.00 x 900.00
5 Pipa buta diameter 6" Mtr 30.00 x 310,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00
JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN
An.10 Jenis pekerjaan : Pengad. dan pemasangan screen stainless steel diametr 6"
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00
2 Olie mesin Ltr 1.00 x 35,300.00
3 Veet Kg 0.60 x 33,100.00
4 Kawat las Btg 60.00 x 900.00
5 Screen stainless steel dia 6 : Mtr 30.00 x 1,955,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00
JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN
An.8' Jenis pekerjaan : Pengadaan dan pemasangan pipa jambang diametr 6" (GIP)
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 120.00 x 1.00 5,900.00
2 Olie mesin Ltr 3.00 x 1.00 35,300.00
3 Veet Kg 2.00 x 1.00 33,100.00
4 Kawat las Btg 120.00 x 1.00 900.00
5 Pipa jambang diameter 6" Mtr 60.00 x 302,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00
JUMLAH
1 HARI RATA-RATA 60 M' ----> JADI PER METER
DIBULATKAN
An.9' Jenis pekerjaan : Pengadaan dan pemasangan pipa buta diametr 4" (GIP)
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00
2 Olie mesin Ltr 1.00 x 35,300.00
3 Veet Kg 0.60 x 33,100.00
4 Kawat las Btg 60.00 x 900.00
5 Pipa buta diameter 4" Mtr 30.00 x 198,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00
JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN
An.10' Jenis pekerjaan : Pengad. dan pemasangan screen stainless steel diametr 4"
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00
2 Olie mesin Ltr 1.00 x 35,300.00
3 Veet Kg 0.60 x 33,100.00
4 Kawat las Btg 60.00 x 900.00
5 Screen stainless steel dia 4" : Mtr 30.00 x 1,335,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00
JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN
PEMBUATAN SUMUR PRODUKSI
JUML. HARGA
75,000.00
50,000.00
200,000.00
160,000.00
1,000,000.00
1,485,000.00
JUML. HARGA
75,000.00
60,000.00
50,000.00
50,000.00
50,000.00
60,000.00
100,000.00
80,000.00
413,000.00
176,500.00
66,200.00
456,000.00
400,000.00
2,036,700.00
203,670.00
JUML. HARGA
75,000.00
60,000.00
50,000.00
50,000.00
50,000.00
60,000.00
100,000.00
80,000.00
442,500.00
176,500.00
66,200.00
570,000.00
375,000.00
2,155,200.00
215,520.00
JUML. HARGA
75,000.00
60,000.00
50,000.00
50,000.00
50,000.00
60,000.00
100,000.00
80,000.00
501,500.00
211,800.00
99,300.00
684,000.00
375,000.00
2,396,600.00
239,660.00
JUML. HARGA
75,000.00
60,000.00
50,000.00
50,000.00
50,000.00
60,000.00
100,000.00
80,000.00
354,000.00
141,200.00
66,200.00
456,000.00
375,000.00
1,917,400.00
191,740.00
JUML. HARGA
75,000.00
60,000.00
50,000.00
50,000.00
50,000.00
60,000.00
100,000.00
80,000.00
442,500.00
211,800.00
99,300.00
627,000.00
375,000.00
2,280,600.00
228,060.00
JUML. HARGA
75,000.00
60,000.00
50,000.00
100,000.00
20,000.00
15,000.00
700,000.00
150,000.00
1,170,000.00
23,400.00
JUML. HARGA
75,000.00
50,000.00
60,000.00
150,000.00
80,000.00
708,000.00
105,900.00
66,200.00
108,000.00
26,400,000.00
375,000.00
50,000.00
28,228,100.00
470,468.33
470,000.00
JUML. HARGA
75,000.00
50,000.00
60,000.00
150,000.00
80,000.00
236,000.00
35,300.00
19,860.00
54,000.00
9,300,000.00
375,000.00
50,000.00
10,485,160.00
349,505.33
349,000.00
JUML. HARGA
75,000.00
50,000.00
60,000.00
150,000.00
80,000.00
236,000.00
35,300.00
19,860.00
54,000.00
58,650,000.00
375,000.00
50,000.00
59,835,160.00
1,994,505.33
1,994,000.00
engadaan dan pemasangan pipa jambang diametr 6" (GIP)
JUML. HARGA
75,000.00
50,000.00
60,000.00
150,000.00
80,000.00
708,000.00
105,900.00
66,200.00
108,000.00
18,120,000.00
375,000.00
50,000.00
19,948,100.00
332,468.33
332,000.00
JUML. HARGA
75,000.00
50,000.00
60,000.00
150,000.00
80,000.00
236,000.00
35,300.00
19,860.00
54,000.00
5,940,000.00
375,000.00
50,000.00
7,125,160.00
237,505.33
237,000.00
engad. dan pemasangan screen stainless steel diametr 4"
JUML. HARGA
75,000.00
50,000.00
60,000.00
150,000.00
80,000.00
236,000.00
35,300.00
19,860.00
54,000.00
40,050,000.00
375,000.00
50,000.00
41,235,160.00
1,374,505.33
1,374,000.00