% Thd.
No. Mata
Total
Pembayaran
Uraian
Satuan
Perkiraan
Kuantitas
Biaya
a
0.5719
1.2
###Mobilisasi
LS
1.0
0.0572
1.8
LS
1.0
0.0000
1.18.(1)
LS
0.0000
1.18.(2)
LS
0.0000
1.18.(3)
LS
0.0000
1.18.(4)
LS
0.0000
1.18.(5)
LS
0.0000
1.20.1
M1
0.0000
1.20.2
M1
0.0487
2.1
M3
209.0
1.1181
2.2
M3
144.0
0.0000
2.3.1
M1
0.0000
2.3.2
M1
0.0000
2.3.3
M1
0.0000
2.3.4
M1
0.0000
2.3.5
Ton
0.0000
2.3.6
M1
0.0000
2.3.7
M1
0.0000
2.3.8
M1
0.0000
2.3.9
M1
0.0000
2.3.10
M1
0.0000
2.3.11
M1
0.0000
2.3.12
M3
0.0000
2.3.13
Kg
0.0000
2.3.14
M3
0.0000
2.4.1
M3
0.0000
2.4.2
M2
0.0000
2.4.3
M1
162714.9200
3.1.1
###Galian Biasa
M3
4.0
0.0000
3.1.2
###Galian Batu
M3
14290446.7292
3.1.3
M3
284.5
95286250.3754
3.1.4
M3
153.9
0.0000
3.1.5
M3
0.0000
3.1.7
M3
0.0000
3.1.8
M3
0.0000
3.1.9.
M3
0.0000
3.2.1
M3
51250000.0000
3.2.2
###Timbunan Biasa
M3
500.0
50347600.0000
3.2.3
###Timbunan Pilihan
M3
400.0
0.0000
3.3
M3
35183063.4646
3.4.1
M2
2,000.0
0.0000
3.4.2
M2
0.0000
3.4.3
Pohon
0.0000
3.4.4
Pohon
0.0000
3.4.5
Pohon
0.0000
3.4.6
Pohon
###
###
###
###
###
###
###
0.0000
4.2.1
M3
13824091.2000
4.2.2
M3
30.0
0.0000
4.2.3
Ton
0.0000
4.2.4
M3
0.0000
4.2.5
M2
0.0000
4.2.6
Liter
0.0000
4.2.7
Liter
20917381.3452
5.1.1
M3
48.0
32933967.9667
5.1.2
M3
72.0
0.0000
5.1.3
M3
0.0000
5.2,1
M3
0.0000
5.3.1
M3
0.0000
5.3.2
M3
0.0000
5.3.3
M3
0.0000
5.4.1
Ton
0.0000
5.4.2
M3
0.0000
5.5.(1)
###Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB))
M3
0.0000
5.5.(2)
M3
6893192.7015
6.1 (1)(a)
Liter
630.0
0.0000
6.1 (1)(b)
Liter
###
25582745.1600
6.1 (2)(a)
Liter
2,268.0
0.0000
6.1 (2)(b)
Liter
0.0000
6.1 (2)(c)
Liter
0.0000
6.2 (1)
M2
0.0000
6.2 (2)
M2
0.0000
6.2 (3)(a)
Liter
0.0000
6.2 (3)(b)
Liter
0.0000
6.2 (4)(a)
Liter
0.0000
6.2 (4)(b)
Liter
0.0000
6.2 (4)(c)
Liter
0.0000
6.2 (4)(d)
Liter
0.0000
6.2 (4)(e)
Liter
0.0000
6.3 (1)
M2
0.0000
6.3 (2)
M2
0.0000
6.3(3a)
Ton
0.0000
6.3(3b)
Ton
0.0000
6.3.4a
Ton
0.0000
6.3.4b
Ton
15821115.2332
6.3(5a)
Ton
40.7
0.0000
6.3(5b)
Ton
0.0000
6.3(5c)
Ton
0.0000
6.3(5d)
Ton
26962081.8835
6.3(6a)
Ton
69.0
0.0000
6.3(6b)
Ton
0.0000
6.3(6c)
Ton
0.0000
6.3(6d)
Ton
0.0000
6.3(7a)
Ton
0.0000
6.3(7b)
Ton
0.0000
6.3(7c)
Ton
0.0000
6.3(7d)
Ton
70794.0000
6.3.8
###Aspal
Ton
7.5
2980800.0000
6.3.9
Kg
99.4
29162160.0000
6.3.10
Kg
24,840.0
0.0000
6.4 (1)
### Lasbutag
M2
0.0000
6.4 (2)
M2
0.0000
6.4 (3)
M2
0.0000
6.4 (4)
Ton
0.0000
6.4 (5)
Ton
0.0000
6.4 (6)
Liter
0.0000
6.5
M3
0.0000
6.6.1
M3
0.0000
6.6.2
M3
0.0000
7.1 (1)
M3
0.0000
7.1 (2)
M3
0.0000
7.1 (3)
M3
0.0000
7.1 (4)
M3
217610214.3108
7.1 (5)
M3
112.7
0.0000
7.1 (6)
M3
412935883.2733
7.1 (7)
M3
253.0
22776826.2336
7.1 (8)
M3
17.8
67870106.2745
7.1 (9)
M3
59.1
2691771.0031
7.1 (10)
M3
2.4
0.0000
7.2 (1)
0.0000
7.2 (1)
Buah
0.0000
7.2 (1)
Buah
###
7.2 (1)
Buah
5.0
0.0000
7.2 (1)
Buah
0.0000
7.2 (2)
0.0000
7.2 (2)
Buah
0.0000
7.2 (2)
Buah
0.0000
7.2 (2)
Buah
0.0000
7.2 (2)
Buah
0.0000
7.2 (3)
0.0000
7.2 (3)
Buah
0.0000
7.2 (3)
Buah
0.0000
7.2 (3)
Buah
0.0000
7.2 (3)
Buah
0.0000
7.2.(4)
###Baja Prategang
Kg
91078960.0000
7.2.(5)
6356366.0691
7.2.(6)
0.0000
35157500.0000
7.3 (1)
Kg
0.0000
7.3 (2)
Kg
###
7.3 (3)
Kg
52,490.0
0.0000
7.3 (4)
Kg
0.0000
7.3 (5)
Kg
0.0000
7.3 (6)
Kg
0.0000
7.4 (1)
Kg
0.0000
7.4 (2)
Kg
0.0000
7.4 (3)
Kg
0.0000
7.4 (4)
Kg
0.0000
7.4 (5)
Kg
0.0000
7.4 (6)
0.0000
Kg
0.0000
Kg
0.0000
Kg
0.0000
Kg
0.0000
Kg
0.0000
7.4 (7)
Buah
0.0000
7.4 (8)
Buah
0.0000
7.5 (1)
Buah
0.0000
7.5 (2)
Buah
0.0000
7.6 (1)
Meter Panjang
0.0000
7.6 (2)
Meter Panjang
0.0000
7.6 (3)
Meter Panjang
0.0000
7.6 (4)
Buah
140.0
m3
###(post-tension)
5.0
-
2,009.0
0.0000
###a)
Kg
0.0000
###b)
Kg
0.0000
###c)
Kg
0.0000
7.6 (5)
0.0000
###a)
350 mm x 350 mm
Meter Panjang
0.0000
###b)
400 mm x 400 mm
Meter Panjang
0.0000
###c)
450 mm x 450 mm
Meter Panjang
0.0000
7.6 (6)
0.0000
###a)
0.0000
0.0000
0.0000
7.6 (7)
0.0000
7.6 (8)
Diameter 350 mm
Meter Panjang
###b)
Diameter 400 mm
Meter Panjang
###c)
Diameter 450 mm
Meter Panjang
Meter Panjang
###a)
350 mm x 350 mm
Meter Panjang
###b)
400 mm x 400 mm
Meter Panjang
0.0000
###c)
450 mm x 450 mm
Meter Panjang
0.0000
7.6 (9)
0.0000
###a)
350 mm x 350 mm
Meter Panjang
0.0000
###b)
400 mm x 400 mm
Meter Panjang
0.0000
###c)
450 mm x 450 mm
Meter Panjang
0.0000
7.6 (10)
0.0000
###a)
Meter Panjang
0.0000
###b)
Meter Panjang
0.0000
###c)
Meter Panjang
0.0000
7.6 (11)
Meter Panjang
0.0000
7.6 (12)
###Tambahan Biaya untuk no. Mata Pembayaran 7.6.(7) s/d 7.6.(10) bila tianMeter Panjang
0.0000
7.6 (13)
###Tambahan Biaya untuk no. Mata Pembayaran 7.6.(11) bila tiang bor dikerjak
Meter Panjang
0.0000
7.6 (14)
0.0000
7.6 (15)
0.0000
Buah
0.0000
Buah
0.0000
7.6 (16)
0.0000
Buah
0.0000
Buah
0.0000
7.6 (17)
Buah
4378000.0000
7.7 (1)
Meter Panjang
16.0
2733548.3806
7.7 (2)
Meter Panjang
16.0
0.0000
Meter Panjang
-
17030459.3000
7.9
###Pasangan Batu
Meter Kubik
31.4
0.0000
7.10 (1)
Meter Kubik
0.0000
7.10 (2)
Meter Kubik
0.0000
7.10 (3)
###Bronjong
Meter Kubik
2429502.0000
7.11 (1)
Meter Panjang
11.8
0.0000
7.11 (2)
Meter Panjang
0.0000
7.11 (3)
Meter Panjang
0.0000
7.11 (4)
Meter Panjang
0.0000
7.11 (5)
Meter Panjang
0.0000
7.11 (6)
Meter Panjang
0.0000
7.12 (1)
###Perletakan Logam
Buah
16549800.0000
7.12 (2)
Buah
10.0
0.0000
7.12 (3)
Buah
0.0000
7.12 (4)
Buah
0.0000
7.12 (5)
###Perletakan Strip
Meter Panjang
33388977.6000
7.13.
###Sandaran (Railing)
Meter Panjang
158.4
306383.0000
7.14
Buah
2.0
0.0000
7.15 (1)
Meter Kubik
0.0000
7.15 (2)
###Pembongkaran Beton
Meter Kubik
0.0000
7.15 (3)
Meter Kubik
0.0000
7.15 (4)
Meter Persegi
0.0000
7.15 (5)
Meter Persegi
0.0000
7.15 (6)
Meter Panjang
0.0000
7.15 (7)
Meter Persegi
0.0000
7.15 (8)
Meter Persegi
0.0000
7.15.(9)
M3 / Km
0.0000
7.16
Meter Panjang
0.0000
8.1 (1)
M3
0.0000
8.1 (2)
M3
0.0000
8.1 (3)
###Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur)
0.0000
8.1 (4)
M3
0.0000
8.1 (5)
M3
0.0000
8.1 (6)
M3
0.0000
8.1 (7)
M3
0.0000
8.1 (8)
M3
0.0000
8.1 (9)
Liter
0.0000
8.2(1)
M3
0.0000
8.2(2)
M2
0.0000
8.2(3)
Buah
0.0000
8.2(4)
Buah
0.0000
8.2(5)
Buah
0.0000
8.3.(1)
M2
0.0000
8.3.(2)
###Semak / Perdu
M2
0.0000
8.3.(3)
###Pohon
9846196.9485
8.4.(1)
8.4.(2)
0.0000
Buah
M2
84.9
M2
844064.0087
8.4.(3) .(a) ###Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade
Buah
2.0
1250492.7974
8.4.(3) .(b) ###Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade
Buah
2.0
0.0000
8.4.(4) .(a) ###Rambu Jalan Tunggal dengan Pemantul High Intensity Grade
Buah
0.0000
8.4.(4) .(b) ###Rambu Jalan Ganda dengan Pemantul High Intensity Grade
Buah
###Patok Pengarah
Buah
56.0
0.0000
Buah
0.0000
Buah
7380932.7020
8.4.(5)
0.0000
8.4.(7)
###Rel Pengaman
M1
0.0000
8.4.(8)
###Paku Jalan
Buah
0.0000
8.4.(9)
###Mata Kucing
Buah
0.0000
Buah
16297164.0000
M1
71.8
0.0000
M1
0.0000
Buah
0.0000
Buah
0.0000
Buah
0.0000
Buah
0.0000
Buah
0.0000
Buah
0.0000
8.4.(11)
M1
0.0000
8.4.(12)
M2
0.0000
8.5(1)
M2
0.0000
8.5(2)
M2
0.0000
8.5(3)
M2
0.0000
8.6(1)
M1
0.0000
8.7(1)
###Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 Watt
Buah
0.0000
8.7(2)
###Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 Watt
Buah
0.0000
8.7(3)
###Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt
Buah
0.0000
8.7(4)
###Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt
Buah
0.0000
8.7(5)
###Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt
Buah
0.0000
8.7(6)
###Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt
Buah
0.0000
8.8(1)
M1
0.0000
8.8(2)
M1
0.0000
9.1
###Mandor
Jam
0.0000
9.2
###Pekerja Biasa
Jam
0.0000
9.3
Jam
0.0000
9.4
Jam
0.0000
9.5
Jam
0.0000
9.6
Jam
0.0000
9.7
Jam
0.0000
9.8
Jam
0.0000
0.0000
9.9
9.10
Jam
Jam
0.0000
9.11
Jam
0.0000
9.12
###Crane 10 - 15 Ton
Jam
0.0000
9.13
Jam
0.0000
9.14
Jam
0.0000
9.15
Jam
0.0000
9.16
Jam
0.0000
9.17
Jam
0.0000
9.18
Jam
0.0000
9.19
Jam
0.0000
9.20
###Jack Hammer
Jam
0.0000
10.1 (1)
LS
0.0000
10.1 (2)
LS
0.0000
10.1 (3)
LS
0.0000
10.1 (4)
LS
38814548.1500
10.1 (5)
LS
1.0
TOTAL BIAYA
###
Cumm
Harga
Jumlah
% for
Satuan
Harga-Harga
Major
(Rupiah)
(Rupiah)
Items
50,000,000
50,000,000
5,000,000
5,000,000
20,356
4,254,502
678,820
97,750,052
581,853
834,387
1,479,208
1,960,217
18,485,010
144,151
163,479
182,973
311,959
26,739
66,451
40,679
162,715
50,223
14,290,447
619,305
95,286,250
621,458
114,617
561,843
102,500
51,250,000
125,869
50,347,600
187,228
17,592
35,183,063
69,224
117,474
109,154
164,044
335,160
437,290
460,803
13,824,091
1,468,246
127,712
7,048
12,383
11,497
435,779
20,917,381
457,416
32,933,968
441,547
434,703
1,750,501
105,722
1,490,024
93,889
10,942
6,893,193
11,280
25,582,745
12,253
19,365
11,618
47,904
59,044
347,240
347,240
352,745
352,745
388,261
15,821,115
416,769
388,261
416,769
390,755
26,962,082
425,658
390,755
725,903
397,397
400,350
397,397
400,350
9,500
70,794
30,000
2,980,800
1,174
29,162,160
8,561
2,952
4,804
1,915,469
10,168,070
24,000
2,024,077
1,793,265
1,917,768
2,366,426
2,245,507
1,930,880
217,610,214
1,666,682
1,632,222
412,935,883
1,279,597
22,776,826
1,148,783
67,870,106
1,121,571
2,691,771
31,314,755
52,552,832
210,650,000
1,053,250,000
680,855
31,314,755
52,552,832
210,000,000
680,855
214,342
650,564
91,078,960
1,281,525
6,356,366
17,500
35,157,500
19,623
20,888
1,096,400,360
11,960
13,141
54,309
13,313
13,313
13,313
767
608
767
608
40,868
48,741
43,240
109,068
###
1,677,624
2,966,927
134,285
44,762
900,961
24,432
11,897
273,625
4,378,000
170,847
2,733,548
542,890
17,030,459
1,038,937
529,927
892,603
205,890
2,429,502
1,200,000
77,864
1,654,980
16,549,800
1,980,000
210,789
33,388,978
153,192
306,383
196,746
354,196
173,398
57,505
247,152
200,843
51,518
179,768
80,000
499,056
498,571
422,477
437,317
2,626,618
1,769,967
1,863,040
12,264
57,696
72,001
109,154
164,044
335,160
10,064
9,773
9,198
115,947
9,846,197
104,734
422,032
844,064
625,246
1,250,493
468,607
717,582
131,802
7,380,933
504,724
217,404
734,406
144,888
187,956
226,980
16,297,164
41,726
50,848
86,561
360,456
48,381
881,336
24,268,438
1,729,081
1,708,536
1,729,081
1,708,536
1,729,081
332,780
736,890
8,200
6,843
8,924
179,124
323,825
179,144
444,244
235,449
172,754
130,960
0
0
232,238
240,310
150,198
150,207
27,632
179,942
147,597
34,421
27,996
18,354
96,960,126
28,326,865
35,907,602
6,263,278
38,814,548
38,814,548
3,736,051,015
No. Mata
Uraian
Pembayaran
a
Satuan
Perkiraan
Kuantitas
d
1.2
Mobilisasi
LS
1.0
1.8
LS
1.0
1.18.(1)
LS
1.18.(2)
LS
1.18.(3)
LS
1.18.(4)
LS
1.18.(5)
LS
1.20.1
M1
1.20.2
M1
2.1
M3
209.0
2.2
M3
144.0
2.3.1
M1
2.3.2
M1
2.3.3
M1
2.3.4
M1
2.3.5
Ton
2.3.6
M1
2.3.7
M1
2.3.8
M1
2.3.9
M1
2.3.10
M1
2.3.11
M1
2.3.12
M3
2.3.13
Kg
2.3.14
M3
2.4.1
M3
2.4.2
M2
2.4.3
M1
3.1.1
Galian Biasa
M3
4.0
3.1.2
Galian Batu
M3
3.1.3
M3
284.5
3.1.4
M3
153.9
3.1.5
M3
3.1.7
M3
3.1.8
M3
3.1.9.
M3
3.2.1
M3
3.2.2
Timbunan Biasa
M3
500.0
3.2.3
Timbunan Pilihan
M3
400.0
M3
3.4.1
M2
2,000.0
3.4.2
M2
3.4.3
Pohon
3.4.4
Pohon
3.4.5
Pohon
3.4.6
Pohon
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
3.3
Err:509
Err:509
Err:509
Err:509
4.2.1
M3
4.2.2
M3
30.0
4.2.3
Ton
4.2.4
M3
4.2.5
M2
4.2.6
Liter
4.2.7
Liter
5.1.1
M3
48.0
5.1.2
M3
72.0
5.1.3
M3
5.2,1
M3
5.3.1
M3
5.3.2
M3
5.3.3
M3
5.4.1
Ton
5.4.2
M3
5.5.(1)
Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB))
M3
5.5.(2)
M3
6.1 (1)(a)
Liter
630.0
6.1 (1)(b)
Err:509
Err:509
Liter
Err:509
Err:509
6.1 (2)(a)
Liter
2,268.0
6.1 (2)(b)
Liter
6.1 (2)(c)
Liter
6.2 (1)
M2
6.2 (2)
M2
6.2 (3)(a)
Liter
6.2 (3)(b)
Liter
6.2 (4)(a)
Liter
6.2 (4)(b)
Liter
6.2 (4)(c)
Liter
6.2 (4)(d)
Liter
6.2 (4)(e)
Liter
6.3 (1)
M2
6.3 (2)
M2
6.3(3a)
Ton
6.3(3b)
Ton
6.3.4a
Ton
6.3.4b
Ton
6.3(5a)
Ton
40.7
6.3(5b)
Ton
6.3(5c)
Ton
6.3(5d)
Ton
6.3(6a)
Ton
69.0
6.3(6b)
Ton
6.3(6c)
Ton
6.3(6d)
Ton
6.3(7a)
Ton
6.3(7b)
Ton
6.3(7c)
Ton
6.3(7d)
Ton
6.3.8
Aspal
Ton
7.5
6.3.9
Kg
99.4
6.3.10
Kg
24,840.0
6.4 (1)
Lasbutag
M2
6.4 (2)
Latasbusir Kelas A
M2
6.4 (3)
Latasbusir Kelas B
M2
6.4 (4)
Bitumen Asbuton
Ton
6.4 (5)
Ton
6.4 (6)
Liter
M3
6.6.1
M3
6.5
6.6.2
M3
7.1 (1)
M3
7.1 (2)
M3
7.1 (3)
M3
7.1 (4)
M3
7.1 (5)
M3
112.7
7.1 (6)
M3
7.1 (7)
M3
253.0
7.1 (8)
M3
17.8
7.1 (9)
M3
59.1
7.1 (10)
M3
2.4
7.2 (1)
7.2 (1)
Buah
7.2 (1)
Buah
7.2 (1)
Buah
5.0
7.2 (1)
Buah
7.2 (2)
7.2 (2)
Buah
7.2 (2)
Buah
7.2 (2)
Buah
7.2 (2)
Buah
7.2 (3)
7.2 (3)
Buah
7.2 (3)
Buah
7.2 (3)
Buah
7.2 (3)
Buah
7.2.(4)
Baja Prategang
Kg
7.2.(5)
7.2.(6)
Buah
(post-tension)
m3
0
140.0
5.0
-
7.3 (1)
Kg
2,009.0
7.3 (2)
Kg
7.3 (3)
Kg
52,490.0
7.3 (4)
Kg
7.3 (5)
Kg
7.3 (6)
Kg
7.4 (1)
Kg
7.4 (2)
Kg
7.4 (3)
Kg
7.4 (4)
Kg
7.4 (5)
Kg
7.4 (6)
a) Panjang 40 m, Lebar 9 m
Kg
b) Panjang 45 m, Lebar 9 m
Kg
c) Panjang 50 m, Lebar 9 m
Kg
d) Panjang 60 m, Lebar 9 m
Kg
Kg
7.4 (7)
Buah
7.4 (8)
Buah
7.5 (1)
Buah
7.5 (2)
Buah
7.6 (1)
Meter Panjang
7.6 (2)
Meter Panjang
7.6 (3)
Meter Panjang
7.6 (4)
a)
Kg
b)
Kg
c)
Kg
7.6 (5)
a)
350 mm x 350 mm
Meter Panjang
b)
400 mm x 400 mm
Meter Panjang
c)
450 mm x 450 mm
Meter Panjang
7.6 (6)
Diameter 350 mm
Meter Panjang
a)
b)
Diameter 400 mm
Meter Panjang
c)
Diameter 450 mm
Meter Panjang
Meter Panjang
7.6 (7)
7.6 (8)
a)
350 mm x 350 mm
Meter Panjang
b)
400 mm x 400 mm
Meter Panjang
c)
450 mm x 450 mm
Meter Panjang
7.6 (9)
a)
350 mm x 350 mm
Meter Panjang
b)
400 mm x 400 mm
Meter Panjang
c)
450 mm x 450 mm
Meter Panjang
7.6 (10)
Meter Panjang
b)
Meter Panjang
c)
Meter Panjang
7.6 (11)
Meter Panjang
7.6 (12)
Tambahan Biaya untuk no. Mata Pembayaran 7.6.(7) s/d 7.6.(10) bila tianMeter Panjang
7.6 (13)
Tambahan Biaya untuk no. Mata Pembayaran 7.6.(11) bila tiang bor dikerjak
Meter Panjang
7.6 (14)
Meter Panjang
7.6 (15)
Buah
b) Cara Dongkrak
Buah
7.6 (16)
Buah
Buah
7.6 (17)
Buah
7.7 (1)
Meter Panjang
16.0
7.7 (2)
Meter Panjang
16.0
7.9
Pasangan Batu
Meter Kubik
31.4
7.10 (1)
Meter Kubik
7.10 (2)
Meter Kubik
7.10 (3)
Bronjong
Meter Kubik
7.11 (1)
Meter Panjang
11.8
7.11 (2)
Meter Panjang
7.11 (3)
Meter Panjang
7.11 (4)
Meter Panjang
7.11 (5)
Meter Panjang
7.11 (6)
Meter Panjang
7.12 (1)
Perletakan Logam
Buah
7.12 (2)
Buah
10.0
7.12 (3)
Buah
7.12 (4)
Buah
7.12 (5)
Perletakan Strip
Meter Panjang
7.13.
Sandaran (Railing)
Meter Panjang
158.4
7.14
Buah
2.0
7.15 (1)
Meter Kubik
7.15 (2)
Pembongkaran Beton
Meter Kubik
7.15 (3)
Meter Kubik
7.15 (4)
Meter Persegi
7.15 (5)
Meter Persegi
7.15 (6)
Meter Panjang
7.15 (7)
Meter Persegi
7.15 (8)
Meter Persegi
7.15.(9)
M3 / Km
Meter Panjang
8.1 (1)
7.16
M3
8.1 (2)
M3
8.1 (3)
Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur)
8.1 (4)
M3
8.1 (5)
M3
8.1 (6)
M3
8.1 (7)
M3
8.1 (8)
M3
8.1 (9)
Liter
8.2(1)
M3
8.2(2)
M2
8.2(3)
Buah
8.2(4)
Buah
8.2(5)
Buah
8.3.(1)
M2
8.3.(2)
Semak / Perdu
M2
8.3.(3)
Pohon
8.4.(1)
8.4.(2)
Buah
M2
84.9
M2
8.4.(3) .(a)
Buah
2.0
8.4.(3) .(b)
Buah
2.0
8.4.(4) .(a)
Buah
8.4.(4) .(b)
Buah
8.4.(5)
Patok Pengarah
Buah
56.0
8.4.(6) .(a)
Patok Kilometer
Buah
8.4.(6) .(b)
Patok Hektometer
Buah
8.4.(7)
Rel Pengaman
M1
8.4.(8)
Paku Jalan
Buah
8.4.(9)
Mata Kucing
Buah
8.4.(10)(a)
Buah
8.4.(10)(b)
M1
71.8
8.4.(10)(c)
M1
8.4.(10)(d)
Buah
8.4.(10)(e)
Buah
8.4.(10)(f)
Buah
8.4.(10)(g)
Buah
8.4.(10)(h)
Buah
8.4.(10)(i)
Buah
8.4.(11)
M1
8.4.(12)
M2
8.5(1)
M2
8.5(2)
M2
8.5(3)
M2
8.6(1)
M1
8.7(1)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 Watt
Buah
8.7(2)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 Watt
Buah
8.7(3)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt
Buah
8.7(4)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt
Buah
8.7(5)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt
Buah
8.7(6)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt
Buah
8.8(1)
M1
8.8(2)
M1
9.1
Mandor
Jam
9.2
Pekerja Biasa
Jam
9.3
Jam
9.4
Jam
9.5
Jam
9.6
Jam
9.7
Jam
9.8
Jam
9.9
Jam
9.10
Jam
9.11
Jam
9.12
Crane 10 - 15 Ton
Jam
9.13
Jam
9.14
Jam
9.15
Jam
9.16
Jam
9.17
Jam
9.18
Jam
9.19
Jam
9.20
Jack Hammer
Jam
10.1 (1)
LS
10.1 (2)
LS
10.1 (3)
LS
10.1 (4)
LS
10.1 (5)
LS
1.0
Harga
% Thd.
Jumlah
Satuan
Total Biaya
Harga-Harga
(Rupiah)
(%)
(Rupiah)
g = (d x e)
50,000,000
0.5719
50,000,000
5,000,000
0.0572
5,000,000
20,356
0.0487
4,254,502
678,820
1.1181
97,750,052
581,853
834,387
1,479,208
1,960,217
18,485,010
144,151
163,479
182,973
311,959
26,739
66,451
40,679
162,714.9200
162,715
50,223
14,290,446.7292
14,290,447
619,305
95,286,250.3754
95,286,250
621,458
114,617
561,843
102,500
51,250,000.0000
51,250,000
125,869
50,347,600.0000
50,347,600
187,228
17,592
35,183,063.4646
35,183,063
69,224
117,474
109,154
164,044
335,160
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
437,290
Err:509
0 ###
460,803
13,824,091.2000
13,824,091 ###
1,468,246
0 ###
127,712
0 ###
7,048
0 ###
12,383
0 ###
11,497
0 ###
435,779
20,917,381.3452
20,917,381 ###
457,416
32,933,967.9667
32,933,968 ###
441,547
0 ###
434,703
0 ###
1,750,501
0 ###
0 ###
105,722
0 ###
1,490,024
0 ###
93,889
0 ###
0 ###
0 ###
10,942
6,893,192.7015
6,893,193 ###
0 ###
Err:509
Err:509
Err:509 ###
11,280
25,582,745.1600
25,582,745 ###
0 ###
0 ###
12,253
0 ###
19,365
0 ###
11,618
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
47,904
0 ###
59,044
0 ###
347,240
0 ###
347,240
0 ###
352,745
0 ###
352,745
0 ###
388,261
15,821,115.2332
15,821,115 ###
416,769
0 ###
388,261
0 ###
416,769
0 ###
390,755
26,962,081.8835
26,962,082 ###
425,658
0 ###
390,755
0 ###
725,903
0 ###
397,397
0 ###
400,350
0 ###
397,397
0 ###
400,350
0 ###
9,500
70,794.0000
70,794 ###
30,000
2,980,800.0000
2,980,800 ###
1,174
29,162,160.0000
29,162,160 ###
8,561
0 ###
2,952
0 ###
4,804
0 ###
1,915,469
0 ###
10,168,070
0 ###
24,000
0 ###
2,024,077
0 ###
1,793,265
0 ac-WC
1,917,768
0 ###
2,366,426
2,245,507
1,930,880
217,610,214.3108
217,610,214
1,666,682
1,632,222
412,935,883.2733
412,935,883
1,279,597
22,776,826.2336
22,776,826
1,148,783
67,870,106.2745
67,870,106
1,121,571
2,691,771.0031
2,691,771
31,314,755
52,552,832
210,650,000
1,053,250,000.0000
1,053,250,000
680,855
31,314,755
52,552,832
210,000,000
680,855
214,342
650,564
91,078,960.0000
91,078,960
1,281,525
6,356,366.0691
6,356,366
17,500
35,157,500.0000
35,157,500
19,623
20,888
1,096,400,359.5500
1,096,400,360
11,960
13,141
54,309
13,313
13,313
13,313
767
608
767
608
40,868
48,741
43,240
109,068
1,677,624
2,966,927
134,285
0
#VALUE!
44,762
900,961
24,432
11,897
273,625
4,378,000.0000
4,378,000
170,847
2,733,548.3806
2,733,548
542,890
17,030,459.3000
17,030,459
1,038,937
529,927
892,603
205,890
2,429,502.0000
2,429,502
1,200,000
77,864
1,654,980
16,549,800.0000
16,549,800
1,980,000
210,789
33,388,977.6000
33,388,978
153,192
306,383.0000
306,383
196,746
354,196
173,398
57,505
247,152
200,843
51,518
179,768
80,000
499,056
498,571
422,477
437,317
2,626,618
1,769,967
1,863,040
12,264
57,696
72,001
109,154
164,044
335,160
10,064
9,773
9,198
115,947
9,846,196.9485
9,846,197
104,734
422,032
844,064.0087
844,064
625,246
1,250,492.7974
1,250,493
468,607
717,582
131,802
7,380,932.7020
7,380,933
504,724
217,404
734,406
144,888
187,956
226,980
16,297,164.0000
16,297,164
41,726
50,848
86,561
360,456
48,381
881,336
24,268,438
1,729,081
1,708,536
1,729,081
1,708,536
1,729,081
332,780
736,890
8,200
6,843
8,924
179,124
323,825
179,144
444,244
235,449
172,754
130,960
232,238
240,310
150,198
150,207
27,632
179,942
147,597
34,421
27,996
18,354
96,960,126
28,326,865
35,907,602
6,263,278
38,814,548
38,814,548.1500
38,814,548
Nama Paket
No. Mata
Uraian
Satuan
Pembayaran
a
DIVISI 1. UMUM
1.2
Mobilisasi
LS
1.8
LS
1.18.(1)
LS
1.18.(2)
LS
1.18.(3)
LS
1.18.(4)
LS
1.18.(5)
LS
1.20.1
M1
1.20.2
M1
Manajemen Mutu
LS
1.21
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1
M3
2.2
M3
2.3.1
M1
2.3.2
M1
2.3.3
M1
2.3.4
M1
2.3.5
Ton
2.3.6
M1
2.3.7
M1
2.3.8
M1
2.3.9
M1
2.3.10
M1
2.3.11
M1
2.3.12
M3
2.3.13
Kg
2.3.14
M3
2.4.1
M3
2.4.2
2.4.3
M2
M1
Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Galian Biasa
M3
3.1.2
Galian Batu
M3
3.1.3
M3
3.1.4
M3
3.1.5
M3
3.1.6
LS
Uraian
No. Mata
Satuan
Pembayaran
3.1.7
M3
3.1.8
M3
3.1.9.
M3
3.2.1
M3
3.2.2
Timbunan Biasa
M3
3.2.3
Timbunan Pilihan
M3
M3
3.4.1
M2
3.4.2
M2
3.4.3
Pohon
3.4.4
Pohon
3.4.5
Pohon
3.4.6
Pohon
3.3
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Uraian
No. Mata
Satuan
Pembayaran
M3
4.2.2
M3
4.2.3
Ton
4.2.4
M3
4.2.5
M2
4.2.6
Liter
4.2.7
Liter
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
M3
5.1.2
M3
5.1.3
M3
5.2,1
M3
5.3.1
M3
5.3.2
M3
5.3.3
M3
5.4.1
Ton
5.4.2
M3
5.5.(1)
Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB))
M3
5.5.(2)
M3
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Liter
6.1 (1)(b)
Liter
6.1 (2)(a)
Liter
6.1 (2)(b)
Liter
6.1 (2)(c)
Liter
6.2 (1)
M2
6.2 (2)
M2
6.2 (3)(a)
Liter
6.2 (3)(b)
Liter
6.2 (4)(a)
Liter
6.2 (4)(b)
Liter
6.2 (4)(c)
Liter
6.2 (4)(d)
Liter
6.2 (4)(e)
Liter
6.3 (1)
M2
6.3 (2)
M2
6.3(3a)
Ton
6.3(3b)
Ton
6.3.4a
Ton
6.3.4b
Ton
6.3(5a)
Ton
6.3(5b)
Ton
6.3(5c)
Ton
6.3(5d)
Ton
6.3(6a)
Ton
6.3(6b)
Ton
Uraian
No. Mata
Satuan
Pembayaran
6.3(6c)
Ton
6.3(6d)
Ton
6.3(7a)
Ton
6.3(7b)
Ton
6.3(7c)
Ton
6.3(7d)
Ton
6.3.8
Aspal
Ton
6.3.9
Kg
6.3.10
Kg
6.4 (1)
Lasbutag
M2
6.4 (2)
Latasbusir Kelas A
M2
6.4 (3)
Latasbusir Kelas B
M2
6.4 (4)
Bitumen Asbuton
Ton
6.4 (5)
Ton
6.4 (6)
Liter
M3
6.6.1
6.5
M3
6.6.2
M3
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Uraian
No. Mata
Satuan
Pembayaran
DIVISI 7. STRUKTUR
7.1 (1)
M3
7.1 (2)
M3
7.1 (3)
M3
7.1 (4)
M3
7.1 (5)
M3
7.1 (6)
M3
7.1 (7)
M3
7.1 (8)
M3
7.1 (9)
M3
7.1 (10)
M3
7.2 (1)
7.2 (1)
Buah
7.2 (1)
Buah
7.2 (1)
Buah
7.2 (1)
Buah
7.2 (2)
7.2 (2)
Buah
7.2 (2)
Buah
7.2 (2)
Buah
7.2 (2)
Buah
7.2 (3)
7.2 (3)
Buah
7.2 (3)
Buah
7.2 (3)
Buah
7.2 (3)
Buah
7.2.(4)
Baja Prategang
7.2.(5)
7.2.(6)
Kg
Buah
m3
(post-tension)
7.3 (1)
Kg
7.3 (2)
Kg
7.3 (3)
Kg
7.3 (4)
Kg
7.3 (5)
Kg
7.3 (6)
7.4 (1)
Kg
Kg
7.4 (2)
Kg
7.4 (3)
Kg
7.4 (4)
Kg
7.4 (5)
Kg
7.4 (6)
Kg
b) Panjang 45 m, Lebar 9 m
Kg
c) Panjang 50 m, Lebar 9 m
Kg
d) Panjang 60 m, Lebar 9 m
Kg
Kg
7.4 (7)
Buah
7.4 (8)
7.5 (1)
Buah
Buah
7.5 (2)
7.6 (1)
Meter Panjang
7.6 (2)
Meter Panjang
7.6 (3)
Meter Panjang
7.6 (4)
Buah
a)
Kg
b)
Kg
Uraian
No. Mata
Satuan
Pembayaran
c)
7.6 (5)
7.6 (6)
350 mm x 350 mm
Meter Panjang
b)
400 mm x 400 mm
Meter Panjang
c)
450 mm x 450 mm
Meter Panjang
Diameter 350 mm
Meter Panjang
b)
Diameter 400 mm
Meter Panjang
c)
Diameter 450 mm
Meter Panjang
7.6 (7)
7.6 (8)
7.6 (9)
7.6 (10)
Kg
Meter Panjang
350 mm x 350 mm
Meter Panjang
b)
400 mm x 400 mm
Meter Panjang
c)
450 mm x 450 mm
Meter Panjang
350 mm x 350 mm
Meter Panjang
b)
400 mm x 400 mm
Meter Panjang
c)
450 mm x 450 mm
Meter Panjang
Meter Panjang
b)
Meter Panjang
c)
Meter Panjang
Uraian
No. Mata
Satuan
Pembayaran
7.6 (11)
Meter Panjang
7.6 (12)
Tambahan Biaya untuk no. Mata Pembayaran 7.6.(7) s/d 7.6.(10) bila tiang pancang
Meter Panjang
dikerjakan di air
7.6 (13)
Tambahan Biaya untuk no. Mata Pembayaran 7.6.(11) bila tiang bor dikerjakan di air
Meter Panjang
7.6 (14)
Meter Panjang
7.6 (15)
7.6 (16)
Buah
b) Cara Dongkrak
Buah
Buah
Buah
7.6 (17)
Buah
7.7 (1)
Meter Panjang
7.7 (2)
Meter Panjang
7.9
Pasangan Batu
Meter Kubik
7.10 (1)
Meter Kubik
7.10 (2)
Meter Kubik
7.10 (3)
Bronjong
7.11 (1)
Meter Panjang
7.11 (2)
Meter Panjang
7.11 (3)
Meter Panjang
7.11 (4)
Meter Panjang
7.11 (5)
Meter Panjang
7.11 (6)
Meter Panjang
7.12 (1)
Perletakan Logam
Buah
7.12 (2)
Buah
7.12 (3)
Buah
7.12 (4)
Buah
7.12 (5)
Meter Kubik
Perletakan Strip
Meter Panjang
7.13.
Sandaran (Railing)
Meter Panjang
7.14
Buah
7.15 (1)
Meter Kubik
7.15 (2)
Pembongkaran Beton
Meter Kubik
7.15 (3)
Meter Kubik
7.15 (4)
7.15 (5)
Meter Persegi
7.15 (6)
Meter Panjang
7.15 (7)
Meter Persegi
7.15 (8)
Meter Persegi
7.15.(9)
7.16
Meter Persegi
M3 / Km
Meter Panjang
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
M3
8.1 (2)
8.1 (3)
8.1 (4)
M3
8.1 (5)
M3
8.1 (6)
M3
8.1 (7)
M3
8.1 (8)
M3
M3
M (vol. gembur)
3
8.1 (9)
8.2(1)
Liter
M3
8.2(2)
M2
Uraian
No. Mata
Satuan
Pembayaran
8.2(3)
Buah
8.2(4)
Buah
8.2(5)
Buah
8.3.(1)
8.3.(2)
Semak / Perdu
8.3.(3)
Pohon
8.4.(1)
M2
8.4.(2)
M2
M2
M2
Buah
8.4.(3) .(a)
Buah
8.4.(3) .(b)
Buah
8.4.(4) .(a)
Buah
8.4.(4) .(b)
Buah
8.4.(5)
Patok Pengarah
Buah
8.4.(6) .(a)
Patok Kilometer
Buah
8.4.(6) .(b)
Patok Hektometer
Buah
8.4.(7)
Rel Pengaman
8.4.(8)
Paku Jalan
Buah
M1
8.4.(9)
Mata Kucing
Buah
8.4.(10)(a)
Buah
8.4.(10)(b)
M1
8.4.(10)(c)
M1
8.4.(10)(d)
Buah
8.4.(10)(e)
Buah
8.4.(10)(f)
Buah
8.4.(10)(g)
Buah
8.4.(10)(h)
Buah
8.4.(10)(i)
Buah
8.4.(11)
M1
8.4.(12)
M2
8.5(1)
M2
8.5(2)
M2
8.5(3)
M2
8.6(1)
8.7(1)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 Watt
Buah
8.7(2)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 Watt
Buah
8.7(3)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt
Buah
8.7(4)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt
Buah
8.7(5)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt
Buah
8.7(6)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt
Buah
8.8(1)
M1
8.8(2)
M1
M1
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Mandor
Jam
9.2
Pekerja Biasa
Jam
9.3
Jam
9.4
Jam
9.5
Jam
9.6
Jam
9.7
Jam
9.8
Jam
9.9
Jam
9.10
Jam
9.11
Jam
Uraian
No. Mata
Satuan
Pembayaran
9.12
Crane 10 - 15 Ton
Jam
9.13
Jam
9.14
Jam
9.15
Jam
9.16
Jam
9.17
9.18
9.19
Jam
9.20
Jack Hammer
Jam
Jam
3
Jam
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
LS
10.1 (2)
LS
10.1 (3)
LS
10.1 (4)
LS
10.1 (5)
LS
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
RGA
Perkiraan
Kuantitas
d
Harga
Jumlah
Satuan
Harga-Harga
(Rupiah)
(Rupiah)
f = (d x e)
1.0
50,000,000
50,000,000
1.0
5,000,000
5,000,000
55,000,000
209.0
20,356.47
4,254,502.23
144.0
678,819.80
97,750,051.85
581,852.81
0.00
834,386.55
0.00
1,479,207.85
0.00
1,960,216.89
0.00
18,485,009.66
144,151.25
163,478.94
182,973.21
0
0
0
0
0
0
0
311,959.31
26,738.88
66,451.11
102,004,554
4.00
40,678.73
-
162,715
0
284.5
50,222.98
14,290,447
153.9
619,304.89
95,286,250
621,458.04
15,000,000.00
Perkiraan
Harga
Jumlah
Kuantitas
Satuan
Harga-Harga
(Rupiah)
(Rupiah)
114,616.55
561,843.31
0
0
0
500.0
102,500.00
51,250,000
400.0
125,869.00
50,347,600
2,000.0
187,228.41
17,591.53
35,183,063
69,223.62
117,473.91
109,154.07
164,044.40
335,159.91
0
246,520,075
Perkiraan
Harga
Jumlah
Kuantitas
Satuan
Harga-Harga
(Rupiah)
(Rupiah)
30.0
437,290.33
460,803.04
13,824,091
1,468,245.50
127,711.69
7,047.87
12,382.90
11,496.90
13,824,091
48.0
435,778.78
20,917,381
72.0
457,416.22
32,933,968
441,547.30
434,702.90
1,750,500.86
0
105,722.16
1,490,023.62
93,889.35
53,851,349
630.0
10,941.58
6,893,193
2,268.0
11,279.87
25,582,745
12,253.15
19,365.10
11,618.16
47,903.60
59,044.41
347,240.43
347,240.43
352,744.74
352,744.74
388,261.18
15,821,115
416,769.24
388,261.18
40.7
69.0
416,769.24
390,754.81
26,962,082
425,658.32
Perkiraan
Harga
Jumlah
Kuantitas
Satuan
Harga-Harga
(Rupiah)
(Rupiah)
390,754.81
725,903.01
397,396.93
400,349.82
397,396.93
400,349.82
7.5
9,500.00
70,794
99.4
30,000.00
2,980,800
24,840.0
1,174.00
29,162,160
8,560.86
2,951.52
4,803.98
1,915,468.75
10,168,069.54
24,000.00
2,024,076.88
1,793,264.75
1,917,767.94
107,472,889
Perkiraan
Harga
Jumlah
Kuantitas
Satuan
Harga-Harga
(Rupiah)
(Rupiah)
0
2,366,425.58
0
0
112.7
2,245,506.90
1,930,880.34
217,610,214
1,666,682.46
253.0
1,632,222.16
412,935,883
17.8
1,279,596.98
22,776,826
59.1
1,148,783.11
67,870,106
2.4
1,121,571.25
2,691,771
31,314,754.89
52,552,832.06
5.0
210,650,000.00
1,053,250,000
680,855.42
31,314,754.89
52,552,832.06
210,000,000.00
680,855.42
0
0
0
0
0
214,341.97
140.0
650,564.00
91,078,960
5.0
1,281,525.42
6,356,366
2,009.00
17,500.00
35,157,500
52,490.00
19,622.80
20,887.80
1,096,400,360
11,959.77
13,141.40
54,308.81
0
0
0
13,312.64
13,312.64
13,312.64
0
0
0
0
0
0
0
767.06
608.37
767.06
608.37
40,868.13
48,740.83
43,240.00
109,067.93
Perkiraan
Harga
Jumlah
Kuantitas
Satuan
Harga-Harga
(Rupiah)
(Rupiah)
1,677,623.92
0
0
0
0
2,966,926.98
134,285.02
10,215.19
44,761.67
Perkiraan
Harga
Jumlah
Kuantitas
Satuan
Harga-Harga
(Rupiah)
(Rupiah)
900,961.25
24,431.87
11,896.69
0
0
0
0
0
0
0
0
0
16.0
273,625.00
16.0
170,846.77
2,733,548
31.4
542,890.00
17,030,459
1,038,936.52
529,927.19
11.8
4,378,000
892,602.69
205,890.00
2,429,502
1,200,000.00
77,863.63
10.0
1,654,980.00
16,549,800
1,980,000.00
158.4
210,789.00
33,388,978
2.0
153,191.50
306,383
196,745.93
354,196.29
173,398.15
0
0
57,505.32
247,151.53
200,842.90
51,517.64
179,768.17
0
0
80,000.00
3,082,944,657
499,055.60
498,570.66
422,476.55
437,317.45
2,626,617.51
0
0
1,769,967.10
1,863,040.08
12,263.89
57,695.82
72,001.05
Perkiraan
Harga
Jumlah
Kuantitas
Satuan
Harga-Harga
(Rupiah)
(Rupiah)
84.9
109,154.07
164,044.40
335,159.91
10,064.23
9,772.82
9,197.82
115,946.74
9,846,197
104,734.24
2.0
422,032.00
844,064
2.0
625,246.40
1,250,493
468,607.00
717,582.00
131,802.37
7,380,933
504,724.48
217,404.43
734,405.74
144,888.11
187,955.61
226,980.00
16,297,164
41,725.74
50,848.01
86,561.27
360,456.00
48,380.50
881,336.23
24,268,437.82
1,729,080.54
1,708,536.26
1,729,080.54
1,708,536.26
1,729,080.54
332,780.26
736,890.26
56.0
71.8
-
35,618,850
8,199.50
6,842.50
8,924.00
179,124.37
323,824.55
179,144.48
444,243.62
235,449.07
Err:511
Err:511
130,960.39
232,238.27
Perkiraan
Harga
Jumlah
Kuantitas
Satuan
Harga-Harga
(Rupiah)
(Rupiah)
240,310.20
150,197.66
150,206.55
27,632.17
179,942.13
147,596.63
34,420.96
27,996.42
18,353.96
1.0
96,960,126.07
28,326,865.22
35,907,601.92
6,263,278.35
38,814,548.15
38,814,548
38,814,548
MATA PEMBA
YARAN
:
:
:
:
:
:
URAIAN
a
DIV. I
1.1
1.2
1.3
1.4
1.5
1.6
1.7
P E K E R J AA N
SATU
AN
PERKIRAAN
KUANTITAS
UMUM
Pengadaan dan/atau Sewa Kantor Lapangan (termasuk sewa tanah)
Pengadaan dan/atau Sewa Barak Kerja & Gudang
Pengukuran, Pemasangan Patok dan Papan Proyek
Mobilisasi dan Demomilisasi Peralatan Utama
Pemeliharaan dan Perlindungan Lalu :Lintas
Pengujian/Quality Control
Shop & Asbuilt Drawings
Ls
Ls
Ls
Ls
1.00
Ls
Ls
1.00
1.00
1.00
1.00
PEKERJAAN DRAINASE
2.1
2.2
2.3 (1)
2.3 (2)
M3
M3
M3
M'
2.3 (3)
M'
M3
M3
M3
M3
M2
M'
M3
M3
M3
M3
M2
M'
37.87
9.47
159.47
3.4 (1) b
3.4 (6)
M'
M2
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Kg
Kg
Kg
Kg
Kg
M'
M2
M2
M2
M2
M3
M3
Kg
M'
M'
M3
M3
M'
M'
M'
M'
M'
M'
Buah
Buah
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M3
M3
135.02
7.10 (1)
7.10 (2)
7.10 (3)
7.10 (4)
7.11 (3)
M3
M3
M3
M2
Kg
F.3
F.8
K.710
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
m3
m3
m'
M'
Buah
Buah
Buah
Buah
Buah
M'
M'
M2
Kg
m'
m'
m2
kg
kg
bh
bh
bh
bh
bh
m3
m2
m2
24.18
2.71
5,590.87
4.00
46.00
Patok Kilometer
M'
Rel Pengaman
Buah
Paku jalan (road stud) Tipe ..
Buah
Mata Kucing (cad Eyes) Tipe ..
Buah
Kerb Pracetak
Buah
Kerb yang digunakan kembali
Buah
Tutup baja untuk lubang Drainase Tipe ..
M'
Pipa untuk pembuangan Air Dari Jembatan
Buah
Papan Nama Jembatan
Buah
Lampu penerangan jalan lengan tunggal
Buah
Lampu penerangan jalan lengan ganda
Ls
Sistem & Pesawat pengatur lalu lintas
M2
Pengembalian kondisi Lantai Jembatan Beton
M2
Pengembalian kondisi Lantai Jembatan Kayu
M2
Pengembalian kondisi Pelapis Permukaan Baja Struktur Galvanis
M2
Pengembalian kondisi Pelapis Permukaan Baja Struktur Non Galvanis
M2
Siaran/Voog Talud
M2
Jumlah Harga Pekerjaan Divisi VI (Dipindahkan ke Rekapitulasi Biaya)
HARGA
SATUAN
( Rp.)
HARGA
PEKERJAAN
( Rp.)
f=(d x e)
5,000,000.00
5,000,000.00
5,000,000.00
41,805,000.00
5,000,000.00
41,805,000.00
2,000,000.00
2,000,000.00
2,000,000.00
2,000,000.00
55,805,000.00
0.00
36,578.64
1,385,306.38
79,358.12
751,362.64
137,905.43
21,991,916.81
24,128,585.83
570,167.10
76,984,131.11
76,984,131.11
994,724.76
24,050,055.62
769,759.88
2,087,011.48
16,851.01
94,211,880.98
450,000.00
1,800,000.00
70,000.00
3,220,000.00
125368948.074197
320,876.32
3,349,948.82
0.00
3,349,948.82
: 1.4
: MOBILISASI & DEMOBILISASI
No.
U RAIAN
A.
Sewa Tanah
B.
PERALATAN
Periksa lembar 1.2-2
C.
FASILITAS KONTRAKTOR
Base Camp
Kantor
Barak
Bengkel
Gudang, dan lain-lain
......................
1
2
SATUAN
M2
1
2
3
4
5
6
D.
0.4782 %
HARGA
SATUAN
(Rp.)
VOL.
300
24,850,000
M2
M2
M2
M2
M2
....
0
0
0
0
0
0
50,000
75,000
45,000
25,000
25,000
0
FASILITAS LABORATORIUM
Fasilitas Laboratorium
Ls
5,500,000
Set
Set
Set
Set
Set
Set
Set
Bln
0
0
0
0
0
0
0
0
15,000,000
10,000,000
5,000,000
5,000,000
12,500,000
6,500,000
6,000,000
5,000,000
Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor
Set
Set
Set
Set
Set
Set
Set
Set
Bln
Set
Set
0
0
0
0
0
0
0
0
0
0
0
20,000,000
9,000,000
9,000,000
9,000,000
15,000,000
15,000,000
1,000,000
5,000,000
1,000,000
6,000,000
15,000,000
Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine
Set
Set
Set
Set
500,000
7,000,000
7,000,000
50,000,000
Pendukung
Operasional
E.
E.I.
1
2
3
4
5
6
MOBILISASI LAINNYA
PEKERJAAN DARURAT
Perkuatan Jembatan Lama
Pemeliharaan Jalan Kerja / Samping
......................
......................
......................
......................
LS
LS
....
....
....
....
0
0
100,000,000
25,000,000
E.II.
1
2
3
4
5
6
LAIN-LAIN
Komunikasi Lapangan Lengkap
......................
......................
......................
......................
......................
Set
....
....
....
....
....
1
0
0
0
0
0
4,000,000
0
0
0
0
0
LS
7,455,000
F.
DEMOBILISASI
No.
B.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
1.4
: MOBILISASI & DEMOBILISASI
JENIS ALAT
KODE
ALAT
SATUAN
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
HARGA
SATUAN
(Rp.)
VOL.
PERALATAN
ASPHALT MIXING PLANT
ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100-150 HP
COMPRESSOR 4000-6500 L\M
CONCRETE MIXER 0.3-0.6 M3
CRANE 10-15 TON
DUMP TRUCK 3.5 TON
DUMP TRUCK 10 TON
EXCAVATOR 80-140 HP
FLAT BED TRUCK 3-4 M3
GENERATOR SET
MOTOR GRADER >100 HP
TRACK LOADER 75-100 HP
WHEEL LOADER 1.0-1.6 M3
THREE WHEEL ROLLER 6-8 T
TANDEM ROLLER 6-8 T.
TIRE ROLLER 8-10 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
STONE CRUSHER
0
0
0
0
0
3
1
3
2
1
1
1
0
0
1
1
1
0
0
2
200,000,000
500,000
100,000
500,000
150,000
300,000
1,000,000
150,000
150,000
1,000,000
150,000
300,000
500,000
500,000
500,000
500,000
500,000
500,000
500,000
150,000
40,000,000
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E37
E36
E38
E39
E40
E41
E42
E43
E44
E45
E46
E47
E48
E49
E50
E51
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
2
1
0
1
1
0
1
0
1
2
2
1
1
2
50,000
150,000
50,000
50,000
50,000
500,000
500,000
1,000,000
5,000,000
5,000,000
200,000
500,000
300,000
300,000
300,000
300,000
500,000
1,000,000
Lembar 1.2-1
JUMLAH
HARGA
(Rp.)
24,850,000
0
0
0
0
0
0
5,500,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4,000,000
0
0
0
0
0
7,455,000
41,805,000
Lembar 1.2-2
JUMLAH
HARGA
(Rp.)
0
0
0
0
0
900,000
1,000,000
450,000
300,000
1,000,000
150,000
300,000
0
0
500,000
500,000
500,000
0
0
300,000
0
100,000
150,000
0
50,000
50,000
0
500,000
0
5,000,000
10,000,000
400,000
500,000
300,000
600,000
0
0
0
0
0
0
0
0
0
0
0
300,000
0
0
0
1,000,000
24,850,000.00
FASILITAS LABORATORIUM
SATUAN PENGUKURAN
HARGA SATUAN
NO.
:
:
URAIAN
SATUAN
I.
1.
Laboratory Building
Laboratory Building
m2
II.
1.
2.
3
4
5
6
7
8
Set
Set
Set
Set
Set
Set
Set
Bln
III.
1.
2.
3
4
5
6
7
8
9
10
11
Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Reflux Method
Specific Gravity of Coarse Aggregate
Specific Gravity of Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor
Set
Set
Set
Set
Set
Set
Set
Set
Bln
Set
Set
IV.
1
2
3
4
Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength
Crushing Machine
Set
Set
Set
Set
V.
1
2
3
Peralatan pendukung
Mobil Pick Up
Komputer + Printer
Furniture
Unit
Set
Set
VI.
Operasional
Teknisi Laboratorium
Tenaga Kerja Terampil
Bln
Bln
VII.
Test Luar
Ls
1.
2.
41805000
Catatan :
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan
yang dibayar kontrak) dan biaya lain-lainnya.
Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Peng
TAS LABORATORIUM
Lump sum
Rp.
VOLUME
67,025,000.00
HARGA
SATUAN
TOTAL
KETERANGAN
1.00
25,000.00
SUB TOTAL
25,000.00
25,000.00
1.00
1.00
1.00
1.00
1.00
-
10,000,000.00
20,000,000.00
5,000,000.00
5,000,000.00
7,500,000.00
6,500,000.00
6,000,000.00
5,000,000.00
SUB TOTAL
10,000,000.00
0.00
5,000,000.00
0.00
7,500,000.00
6,500,000.00
6,000,000.00
0.00
35,000,000.00
20,000,000.00
9,000,000.00
9,000,000.00
9,000,000.00
15,000,000.00
15,000,000.00
1,000,000.00
5,000,000.00
1,000,000.00
6,000,000.00
15,000,000.00
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
1.00
1.00
1.00
-
500,000.00
5,000,000.00
5,000,000.00
50,000,000.00
SUB TOTAL
500,000.00
5,000,000.00
5,000,000.00
0.00
10,500,000.00
Beli
Beli
Beli
Beli
1.00
1.00
1.00
2,500,000.00
3,500,000.00
5,000,000.00
SUB TOTAL
2,500,000.00
3,500,000.00
5,000,000.00
11,000,000.00
Sewa
Beli
Beli
3.00
-
3,500,000.00
3,000,000.00
SUB TOTAL
10,500,000.00
0.00
10,500,000.00
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Sewa
1.00
0.00
SUB TOTAL
0.00
0.00
Rp
67,025,000.00
INFORMASI UMUM
No.
U RAIAN
I N F O R MAS I
1.
2.
Nama Paket
3.
4.
Lokasi pekerjaan
Periksa lampiran
5.
PERKERASAN ASPAL
6.
Panjang efektif
7.
( 1.00
+ 6.00
+ 1.00
8.
Lebar Rencana
( 1.00
+ 6.00
+ 1.00
9.
10.
11.
L=
3.15 Km = a
Lihat lampiran.
2.00 Kilometer
2.85 Km = b
0.5 Km = c
12.
13.
14.
15.
16.
a.
b.
c.
7.0
0.002
10.00
15.00
jam
x Harga Pokok Alat
%
% x Biaya Langsung
d.
e.
f.
g.
17.
Lokasi Quarry
Periksa lampiran.
18
Periksa lampiran.
19
Periksa lampiran.
20
....................................
21
....................................
22
....................................
N F O R MAS I
( Leff = a + b )
meter
meter
eriode Pelaksanaan)
...........
............
.............
...........
............
REKAPITULASI
KABUPATEN
KECAMATAN
JENIS PEKERJAAN
RUAS
NO. LINK
VULUME
:
:
:
:
:
:
No. Divisi
Uraian
Umum
Drainase
Pekerjaan Harian
(A)
(B)
(C)
(D)
Terbilang :
Sembilan Milyar Enam Ratus Enam Belas Juta Tiga Ratus Delapan Puluh Delapan R
Sengkang ,
Diperiksa Oleh
Pejabat Pembuat Komitmen Konsultansi
Dinas Pekerjaan Umum Kab. Wajo
Desemb
Konsultan Perenca
CV. Nuritama Mand
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Jumlah Harga
Pekerjaan
(Rupiah)
61,805,000.00
159,384,306.49
2,687,511,331.52
3,478,037,005.22
2,194,577,968.08
160,855,598.04
-
8,742,171,209.36
874,217,120.94
9,616,388,330.29
9,616,388,000.00
am Ratus Enam Belas Juta Tiga Ratus Delapan Puluh Delapan Ribu Rupiah,-
Sengkang ,
Desember 201
Konsultan Perencana
CV. Nuritama Mandiri
WAJO
KECAMATAN
SABBANG PARU
JENIS PEKERJAAN
RUAS
NO. LINK
VULUME
60 x 6.0 M
Uraian
No. Mata
Pembayaran
a
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
b
DIVISI 1. UMUM
Pengadaan dan/atau Sewa Kantor Lapangan (termasuk sewa tanah)
Pengadaan dan/atau Sewa Barak Kerja & Gudang
Pengukuran, Pemasangan Patok dan Papan Proyek
Mobilisasi dan Demomilisasi Peralatan Utama
Pemeliharaan dan Perlindungan Lalu :Lintas
Pengujian/Quality Control
Shop & Asbuilt Drawings
Pembangunan jembatan Semetara
Satuan
Perkiraan
Kuantitas
Ls
Ls
1.00
1.00
Ls
Set
Ls
Ls
Ls
Unit
1.00
1.00
1.00
1.00
1.00
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air
Pasangan Batu dengan Mortar
M3
2.3.1
M1
2.3.2
M1
2.3.3
M1
2.3.4
M1
2.3.5
2.3.6
2.3.7
2.3.8
2.3.9
2.3.10
2.3.11
2.3.12
2.3.13
2.3.14
2.4.1
2.4.2
2.4.3
Ton
M1
M1
M1
M1
M1
M1
M3
Kg
M3
M3
M2
M1
2.1
2.2
M3
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
M3
M3
M3
M3
M3
Ls
M3
257.36
No. Mata
Pembayaran
3.1.8
3.1.9.
3.2.1
3.2.2
3.2.3
3.3
3.4.1
3.4.2
3.4.3
3.4.4
3.4.5
3.4.6
Uraian
Satuan
Perkiraan
Kuantitas
M3
M3
M3
M3
M3
M3
M2
M2
Pohon
Pohon
Pohon
Pohon
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
7.1 (1)
7.1 (2)
7.1 (3)
7.1 (4)
7.1 (5)
7.1 (6)
7.1 (7)
7.1 (8)
M3
M3
M3
M3
M3
M3
M3
M3
282.68
10.74
No. Mata
Pembayaran
7.1 (9)
7.1 (10)
7.2 (1)
7.2 (1)
7.2 (1)
7.2 (1)
7.2 (1)
7.2 (2)
7.2 (2)
7.2 (2)
7.2 (2)
7.2 (2)
7.2 (3)
7.2 (3)
7.2 (3)
7.2 (3)
7.2 (3)
7.2.(4)
7.2.(5)
7.2.(6)
7.3 (1)
7.3 (2)
7.3 (3)
7.3 (4)
7.3 (5)
7.3 (6)
7.4 (1)
7.4 (2)
7.4 (3)
7.4 (4)
7.4 (5)
7.4 (6)
7.4 (7)
7.4 (8)
7.5 (1)
7.5 (2)
7.6 (1)
7.6 (2)
7.6 (3)
7.6 (4)
7.6 (5)
7.6 (6)
7.6 (7)
Uraian
Satuan
Perkiraan
Kuantitas
M3
M3
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Kg
Buah
m3
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
5,085.64
30,151.75
Kg
Kg
Kg
Kg
Kg
Buah
Buah
Buah
Buah
M'
M'
M'
Kg
Kg
Kg
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
216.00
168.00
No. Mata
Pembayaran
7.6 (8)
7.6 (8 a)
7.6 (9)
7.6 (10)
7.6 (11)
7.6 (12)
7.6 (13)
7.6 (14)
7.6 (15)
Uraian
Satuan
Perkiraan
Kuantitas
M'
M'
M'
M'
M'
M'
M'
288.00
96.00
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Buah
2.00
No. Mata
Pembayaran
7.6 (16)
7.6 (17)
7.7 (1)
7.7 (2)
7.9
7.10 (1)
7.10 (2)
7.10 (3)
Uraian
Satuan
Perkiraan
Kuantitas
Buah
Buah
Buah
M'
M'
M3
M3
M3
M3
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
7.1 (1)
7.1 (2)
7.1 (3)
7.1 (4)
7.1 (5)
7.1 (6)
7.1 (7)
7.1 (8)
7.1 (9)
7.1 (10)
7.2 (1)
7.2 (2)
7.2 (3)
7.2 (4)
7.2 (5)
7.2 (6)
7.2 (7)
7.2 (8)
7.2 (8.1)
7.2 (8.2)
7.2 (9)
7.2 (10)
7.2 (11)
7.2.(12)
7.2.(13)
7.3 (1)
7.3 (2)
7.3 (3)
7.3 (4)
7.3 (5)
7.3 (6)
7.4 (1)
7.4 (2)
7.4 (3)
7.4 (4)
7.4 (5)
7.5
7.11 (1)
7.11 (2)
7.11 (3)
7.11 (4)
7.11 (5)
7.11 (6)
7.12 (1)
7.12 (2)
7.12 (3)
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M'
M'
M'
M'
M'
M'
M'
Buah
Buah
Buah
117.32
35.46
8.00
-
30.00
180.00
16.00
2,230.75
19,215.57
16.00
72.00
No. Mata
Pembayaran
7.12 (4)
7.12 (5)
7.13.
7.14
7.15 (1)
7.15 (2)
7.15 (3)
7.15 (4)
7.15 (5)
7.15 (6)
7.15 (7)
7.15 (8)
7.15.(9)
7.16
Uraian
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Satuan
Buah
M'
M'
Buah
M'
M'
M'
M2
M2
M'
M2
M2
M3 / km
M'
Perkiraan
Kuantitas
240.00
2.00
-
No. Mata
Pembayaran
3.1.(1)
3.1.(2)
3.1.(3)
3.1.(6)
3.1.(7)
3.1.(8)
3.1.(9)
3.2.(2)
3.2.(3)
3.4.(1)
3.4.(2)
3.4.(3)
3.4.(4)
4.2.(1)
4.2.(2)
5.1.1
5.1.2
5.2,1
5.5.(1)
5.5.(2)
5.6
5.7
6.1 (1)(a)
6.1 (2)(a)
6.3(3a)
6.3(3b)
6.3.4a
6.3.4b
6.3(5a)
6.3(5b)
6.3(5c)
6.3(5d)
6.3(6a)
6.3(6b)
6.3(6c)
6.3(6d)
6.3(7a)
6.3(7b)
6.3(7c)
6.3(7d)
6.3.8
6.3.9
6.3.10
6.4 (1)
6.4 (2)
6.4 (3)
6.4 (4)
6.4 (5)
6.4 (6)
6.5
6.6.1
6.6.2
7.9
Uraian
Satuan
M3
M3
M3
Ls
M3
M3
M3
M3
M3
M2
M2
Pohon
Pohon
M3
M3
M3
M3
M3
M3
M3
M3
Kg
Liter
Liter
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Kg
Kg
M2
M2
M2
Ton
Ton
Liter
M3
M3
M3
M3
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
8.1 (1)
M3
Perkiraan
Kuantitas
18.20
-
2,904.26
1,050.00
180.00
6.30
207.00
10.80
1,485.10
No. Mata
Pembayaran
8.1 (2)
8.1 (3)
8.1 (4)
8.1 (5)
8.1 (6)
8.1 (7)
8.1 (8)
8.1 (9)
8.2(1)
8.2(2)
8.2(3)
8.2(4)
8.2(5)
8.3.(1)
8.3.(2)
8.3.(3)
8.4.(1)
8.4.(2)
Uraian
Satuan
M3
M3(vol.gbr)
M3
M3
M3
M3
M3
Liter
M3
M2
Buah
Buah
Buah
M2
M2
Buah
M2
M2
Perkiraan
Kuantitas
39.12
Uraian
No. Mata
Pembayaran
8.4.(3) .(a)
8.4.(3) .(b)
8.4.(4) .(a)
8.4.(4) .(b)
8.4.(5)
8.4.(6) .(a)
8.4.(6) .(b)
8.4.(7)
8.4.(8)
8.4.(9)
8.4.(10)(a)
8.4.(10)(b)
8.4.(10)(c)
8.4.(10)(d)
8.4.(10)(e)
8.4.(10)(f)
8.4.(10)(g)
8.4.(10)(h)
8.4.(10)(i)
8.4.(11)
8.4.(12)
8.5(1)
8.5(2)
8.5(3)
8.6(1)
8.7(1)
8.7(2)
8.7(3)
8.7(4)
8.7(5)
8.7(6)
8.8(1)
8.8(2)
Satuan
Buah
Buah
Buah
Buah
Buah
Buah
Buah
M1
Buah
Buah
Buah
M1
M1
Buah
Buah
Buah
Buah
Buah
Buah
M1
M2
M2
M2
M2
M1
Buah
Buah
Buah
Buah
Buah
Buah
M1
M1
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.8
9.9
9.10
9.11
9.12
9.13
9.14
9.15
9.16
9.17
9.18
9.19
9.20
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Perkiraan
Kuantitas
2.00
2.00
210.00
No. Mata
Pembayaran
10.1 (1)
10.1 (2)
10.1 (3)
10.1 (4)
10.1 (5)
Uraian
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Satuan
LS
LS
LS
LS
LS
Perkiraan
Kuantitas
AYA
GA
Harga
Satuan
(Rupiah)
e
Jumlah
Harga-Harga
(Rupiah)
f = (d x e)
5,000,000.00
5,000,000.00
5,000,000.00
5,000,000.00
1,000,000.00
41,805,000.00
1,000,000.00
5,000,000.00
3,000,000.00
1,000,000.00
41,805,000.00
1,000,000.00
5,000,000.00
3,000,000.00
-
61,805,000
20,356.47
0.00
678,819.80
0.00
581,852.81
834,386.55
1,479,207.85
1,960,216.89
18,485,009.66
144,151.25
163,478.94
182,973.21
311,959.31
26,738.88
66,451.11
40,678.73
187,810.42
50,222.98
619,304.89
621,458.04
15,000,000.00
114,616.55
159,384,306.49
-
Harga
Satuan
(Rupiah)
561,843.31
153,290.76
237,688.96
187,228.41
17,591.53
69,223.62
117,473.91
109,154.07
164,044.40
335,159.91
Jumlah
Harga-Harga
(Rupiah)
159,384,306.49
2,366,425.58
2,245,506.90
1,930,880.34
1,666,682.46
1,632,222.16
1,279,596.98
461,396,559.09
13,742,871.56
Harga
Satuan
(Rupiah)
1,148,783.11
1,121,571.25
Jumlah
Harga-Harga
(Rupiah)
-
31,314,754.89
52,552,832.06
210,650,000.00
680,855.42
31,314,754.89
52,552,832.06
210,000,000.00
680,855.42
214,341.97
650,564.00
1,281,525.42
17,500.00
19,622.80
20,887.80
11,959.77
13,141.40
54,308.81
13,312.64
13,312.64
13,312.64
767.06
608.37
767.06
608.37
40,868.13
48,740.83
43,240.00
109,067.93
1,677,623.92
1,677,623.92
2,966,926.98
1,906,268.04
2,859,114.48
2,966,926.98
134,285.02
99,794,471.16
629,803,572.89
-
617,568,728.65
498,443,733.39
-
Harga
Satuan
(Rupiah)
556,580.60
556,580.60
556,580.60
556,580.60
556,580.60
700,550.51
700,550.51
Jumlah
Harga-Harga
(Rupiah)
201,758,546.09
67,252,848.70
44,761.67
900,961.25
24,431.87
11,896.69
48,875,000.00
97,750,000.00
Harga
Satuan
(Rupiah)
9,500,000.00
273625
170,846.77
772,057.25
1,038,936.52
529,927.19
892,602.69
Jumlah
Harga-Harga
(Rupiah)
2,687,511,331.52
2,366,425.58
2,245,506.90
1,930,880.34
1,666,682.46
1,632,222.16
1,279,596.98
1,148,783.11
1,121,571.25
31,314,754.89
0.00
210,650,000.00
296,250,000.00
-
226,530,881.48
57,878,597.66
-
500,000,000.00
513,750,000.00
-
2,370,000,000.00
-
2,750,000.00
82,500,000.00
750,000.00
2,500,000.00
19,239.01
19,622.80
20,887.80
11,959.77
13,141.40
54,308.81
135,000,000.00
40,000,000.00
43,773,549.95
401,370,886.97
540,000.00
-
33,750.00
205,890.00
901,561.36
77,863.63
2,544,613.63
267,613.63
64,912,418.17
-
Harga
Satuan
(Rupiah)
1,980,000.00
230,101.20
153,191.50
196,745.93
354,196.29
173,398.15
57,505.32
247,151.53
200,842.90
51,517.64
179,768.17
80,000.00
Jumlah
Harga-Harga
(Rupiah)
55,224,288.00
306,383.00
-
3,478,037,005.22
Harga
Satuan
(Rupiah)
Jumlah
Harga-Harga
(Rupiah)
40,678.73
50,222.98
15,000,000.00
114,616.55
561,843.31
914,058.24
-
153,290.76
237,688.96
17,591.53
69,223.62
117,473.91
109,154.07
437,290.33
460,803.04
435,778.78
457,416.22
434,702.90
831,949.06
690,310,526.43
18,471,108.32
78,712,259.40
5,241,279.07
254,270,917.40
75,600.00
1,146,582,219.22
1,228,361.92
7,000.00
10,941.58
11,279.87
347,240.43
347,240.43
352,744.74
352,744.74
388,261.18
416,769.24
388,261.18
416,769.24
390,754.81
425,658.32
390,754.81
725,903.01
397,396.93
400,349.82
397,396.93
400,349.82
9,500.00
30,000.00
1,174.00
8,560.86
2,951.52
4,803.98
1,915,468.75
10,168,069.54
24,000.00
2,024,076.88
1,793,264.75
1,917,767.94
772,057.25
2,194,577,968.08
499,055.60
Harga
Satuan
(Rupiah)
498,570.66
422,476.55
437,317.45
2,626,617.51
1,769,967.10
1,863,040.08
12,263.89
57,695.82
72,001.05
109,154.07
164,044.40
335,159.91
10,064.23
9,772.82
9,197.82
115,946.74
104,734.24
Jumlah
Harga-Harga
(Rupiah)
4,535,836.37
-
Harga
Satuan
(Rupiah)
422,032.00
625,246.40
468,607.00
717,582.00
131,802.37
504,724.48
217,404.43
734,405.74
144,888.11
187,955.61
Jumlah
Harga-Harga
(Rupiah)
844,064.01
1,250,492.80
154,225,204.86
-
226,980.00
41,725.74
50,848.01
86,561.27
360,456.00
48,380.50
881,336.23
24,268,437.82
1,729,080.54
1,708,536.26
1,729,080.54
1,708,536.26
1,729,080.54
332,780.26
736,890.26
160,855,598.04
8,199.50
6,842.50
8,924.00
179,124.37
323,824.55
179,144.48
444,243.62
235,449.07
Err:511
130,960.39
232,238.27
240,310.20
150,197.66
150,206.55
27,632.17
179,942.13
147,596.63
34,420.96
27,996.42
18,353.96
Err:511
-
Harga
Satuan
(Rupiah)
96,960,126.07
28,326,865.22
35,907,601.92
6,263,278.35
38,814,548.15
Jumlah
Harga-Harga
(Rupiah)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
U RAIAN
Pekerja
Tukang
Mandor
Operator
Pembantu Operator
Sopir / Driver
Pembantu Sopir / Driver
Mekanik
Pembantu Mekanik
Kepala Tukang
Petugas Flagman
KODE
SATUAN
(L01)
(L02)
(L03)
(L04)
(L05)
(L06)
(L07)
(L08)
(L09)
(L10)
(L11)
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
HARGA
SATUAN
( Rp.)
5,950.00
7,760.00
7,130.00
10,000.00
5,950.00
8,080.00
5,500.00
8,680.00
7,760.00
8,680.00
DAFTAR
HARGA DASAR SATUAN BAHAN
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
U RAIAN
KODE
SATUAN
M01b
M01a
M01c
M01d
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M12
M13
M14
M15
M16
M17a
M17b
M18
M19
M20
M21
M22
M23
M24
M25
M26
M27
M28
M29
M30
M31
M32
M33
M34
M35a
M35b
M36
M37
M39a
M39b
M40
M41
M41kg
M42
M43
M3
M3
M3
M3
M3
M3
M3
Kg
M3
M3
M3
M3
KG
LITER
Zak
Kg
Kg
Kg
Kg
M3
Kg
Kg
Kg
M3
LITER
LITER
LITER
M2
Batang
M'
M3
M3
M3
M3
M2
Kg
M2
LITER
Kg
BH
BH
M'
M3
Kg
Kg
M3
M3
Kg
Kg
Bh.
HARGA
SATUAN
( Rp.)
120,000.00
232,900.00
188,418.98
232,900.00
230,300.00
326,724.15
326,724.15
750.00
372,500.00
112,100.00
49,330.00
97,180.00
9,500.00
8,000.00
58,700.00
1,174.00
13,750.00
19,070.00
31,000.00
231,800.00
22,500.00
27,500.00
37,550.00
1,764,140.00
4,575.00
6,425.00
25,075.00
15,000.00
154,000.00
40,000.00
283,120.27
299,348.85
287,138.80
0.00
27,500.00
8,000.00
5,000.00
12,000.00
28,600.00
176,000.00
216,500.00
412,500.00
1,419,323.61
12,760.00
13,760.00
40,000.00
326,724.15
173.35
27,500.00
12,600.00
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
Pasir Urug
Arbocell
Baja Bergelombang
Beton K-125
Baja Struktur
Tiang Pancang Baja
Tiang Pancang Beton (dia.500 mm) kls B (Bottom)
Tiang Pancang Beton (dia.500 mm) kls B (Middle)
Kawat Las
Pipa Baja
Minyak Fluks
Bunker Oil
Asbuton Halus
Baja Prategang
Baja Tulangan (Polos) U32
Baja Tulangan (Ulir) D39
Baja Tulangan (Ulir) D48
PCI Girder L=17m
PCI Girder L=21m
PCI Girder L=26m
PCI Girder L=30 m
PCI Girder L=38 m
PCI Girder L=40 m
PCI Girder L=42 m
Diafgrama
Plat pracetak
Elastomer Bearing pad
Beton K-300
Beton K-175
Cerucuk
Elastomer
Bahan pengawet: kreosot
Mata Kucing
Anchorage
Anti strpping agent
Bahan Modifikasi
Beton K-500
Beton K-400
Ducting (Kabel prestress)
Ducting (Strand prestress)
Beton K-350
Multipleks 12 mm
Elastomer jenis 1
Elastomer jenis 2
Elastomer jenis 3
Expansion Tipe Joint Asphaltic Plug
Expansion Join Tipe Rubber
Expansion Join Baja Siku (150 150 16)
Marmer
Kerb Type A
Paving Block
Mini Timber Pile
Expansion Joint Tipe Torma
Strip Bearing
Joint Socket Pile 35x35
Joint Socket Pile 16x16x16
Mikro Pile 16x16x16
Matras Concrete
M44
M45
M46
M47
M48
M49
M50
M50
M51
M52
M53
M54
M55
M56
M57a
M39c
M39d
M58a
M58b
M58c
M58d
M58e
M58f
M58f
M59a
M59b
M59c
M59
M60
M61
M62
M63
M64
M65
M66
M67
M68
M69
M70
M71
M72
M73
M74a
M74b
M74c
M75d
M75e
M75f
M76
M77
M78
M79
M80
M81
M82
M83
M84
M85
M3
Kg.
Kg
M3
Kg
M'
M3
M3
Dos
Kg
Liter
Liter
Ton
Kg
Kg
Kg
Kg
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
M3
M3
M
buah
liter
buah
buah
liter
Kg
M3
M3
M'
M'
M3
Lbr
buah
buah
buah
M
M
M
Buah
Buah
Buah
Buah
M1
Buah
Set
Set
M1
Buah
72,700.00
32,000.00
12,500.00
975,279.35
11,000.00
25,247.37
725,000.00
818,750.00
25,000.00
15,000.00
6,237.00
3,000.00
325,000.00
8,000.00
8,400.00
8,450.00
9,000.00
296,250,000.00
456,250,000.00
500,000,000.00
513,750,000.00
2,750,000.00
750,000.00
2,500,000.00
1,449,289.09
1,112,693.03
15,000
300,000
5,000
75,000
480,000
24,000.00
1,000.00
2,057,761.38
1,952,614.70
150,000
50,000
1,679,026.38
181,500.00
1,285,500.00
1,980,000.00
1,000,000.00
1,200,000.00
475,000.00
400,000.00
45,000.00
40,000.00
27,000.00
1,200,000.00
229,500.00
607,500.00
67,500.00
60,750.00
405,000.00
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
Assetilline
Oxygen
Batu Bara
Pipa Galvanis Dia 3"
Pipa Galvanis Dia 1,5"
Pipa PVC Dia 3"
Agregat Pecah Mesin 0-5 mm
Agregat Pecah Mesin 5-10 & 10-20 mm
Agregat Pecah Mesin 20-30 mm
Joint Sealent
Cat Anti Karat
Expansion Cap
Polytene 125 mikron
Curing Compound
Kayu Acuan
Additive
Casing
Pasir Tailing
Polimer
Batubara
Kerb jenis 1
Kerb jenis 2
Kerb jenis 3
Bahan Modifikasi
Aditif anti pengelupasan
Bahan Pengisi (Filler) Tambahan
135
130
131
M86
M87
M88
M24a
M24b
M24b
M91
M92
M93
M94
M95
M96
M97
M98
M99
M67a
M100
Botol
Botol
Kg
M
M
M
M3
M3
M3
Kg
Kg
M2
Kg
Ltr
M3
Ltr
M2
M3
kg
Buah
Buah
Buah
Kg
Kg
Kg
229,500.00
114,750.00
600.00
80,000.00
15,000.00
33,750.00
326,724.15
326,724.15
326,724.15
34,100.00
35,750.00
6,050.00
19,250.00
38,500.00
1,764,140.00
38,500.00
9,000.00
259,000.00
45,000.00
500.00
45,000.00
50,000.00
55,000.00
75,000.00
30,000.00
1,174.00
M3
M'
2,750,000.00
61,875.00
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
KETERANGAN
41,600.00
54,300.00
49,900.00
70,000.00
41,600.00
56,500.00
38,500.00
60,700.00
54,300.00
60,700.00
N
KETERANGAN
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Base Camp
Base Camp
Proses/Base Camp
Lokasi Pekerjaan
Base Camp
Borrow Pit/quarry
Quarry
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pertamina
Pertamina
Pertamina
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Tidak tersedia
Lokasi Pekerjaan
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Hasil Proses
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Pelabuhan terdekat
Lokasi Pekerjaan
Wajo
Wajo
Lokasi Pekerjaan
Pelabuhan terdekat
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Makassar
Makassar
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Jenis Alat
Harga
yang
digunakan
3,698,800
205,000
52,600
402,500
110,700
27,861
480,800
101,000
240,100
349,400
178,400
337,400
332,800
342,300
331,200
137,100
136,800
154,800
171,000
25,000
823,200
25,900
178,400
25,900
24,400
44,100
102,300
169,700
325,800
68,000
327,600
59,700
1,166,100
Harga
3,698,800.00
205,000.00
52,600.00
402,500
110,700
27,861
480,800
101,000
240,100
349,400
178,400
337,400
332,800
342,300
331,200
137,100
136,800
154,800
171,000
25,000
823,200
25,900
178,400
25,900
24,400
44,100
102,300
169,700
325,800
68,000
327,600
59,700
1,166,100
Trailler 15 Ton
Rock Drill Breaker
Cold Milling
Cold Recycler
Hot Recycler
Aggregat (chip) Spreader
Asphalt Distribution
Split Form Paver
Concrete Pan Mixer
Concrete Breaker
Asphalt Tanker
Cement Tanker
Concrete Mixer (350)
Vibrating Rammer
Truk Mixer
Bore Pile Machine Dia 60
Crane On Track 75 - 100Ton
Blending Equipment
Asphalt Liquid Mixer (kap 10000)
Alat tambahan Batubara Direct
Alat tambahan Gas Batubara
Chain Saw
25,600
25,600
450,000,000
900,000,000
1,674,900
6,170,400
8,177,100
458,700
284,700
1,345,300
394,600
528,700
323,500
323,500
51,600
31,500
345,900
955,800
433,000
187,700
63,300
100
100
31,100
450,000,000
900,000,000
1,674,900
6,170,400
8,177,100
458,700
284,700
1,345,300
394,600
528,700
323,500
323,500
51,600
31,500
345,900
955,800
433,000
187,700
63,300.00
100
100
31,100
725,000.00
818,750.00
580,000.00
655,000.00
10
58,000.00
65,500.00
15
87,000.00
98,250.00
620,000.00
62,000.00
682,000.00
Overheed 15%
296,250,000.00
456,250,000.00
500,000,000.00
513,750,000.00
2,750,000.00
750,000.00
2,500,000.00
1,350,000.00
1,620,000.00
1,944,000.00
35,550,000.00
54,750,000.00
60,000,000.00
61,650,000.00
330,000.00
90,000.00
300,000.00
23,700,000.00
36,500,000.00
40,000,000.00
41,100,000.00
220,000.00
60,000.00
200,000.00
33750
7.41
0.14
0.1
458,333.33
61,875.00
458,333.33
Sumber
Data
Keterangan
3,698,800.00
54,500,000.00
45,200,000.00
843,500,000.00
2,500,000.00
27,861.00
480,800.00
101,000.00
240,100.00
349,400.00
178,400.00
337,400.00
332,800.00
342,300.00
331,200.00
137,100.00
136,800.00
154,800.00
171,000.00
25,000.00
823,200.00
25,900.00
178,400.00
59,700.00
24,400.00
44,100.00
102,300.00
169,700.00
325,800.00
188,200.00
327,600.00
60,200.00
955,800.00
###
250,000.00
53,600.00
402,500.00
110,700.00
27,861.00
480,800.00
101,000.00
240,100.00
349,400.00
178,400.00
337,400.00
332,800.00
342,300.00
331,200.00
137,100.00
136,800.00
154,800.00
171,000.00
25,000.00
823,200.00
25,900.00
178,400.00
28,258.76
24,027.97
15,959.96
608,023.55
155,773.23
260,646.73
50,912.24
190,753.36
71,878.49
225,876.80
739,760.00
25,600.00
323,900.00
1,397,900.00
6,170,400.00
8,177,100.00
458,700.00
284,700.00
408,100.00
394,600.00
528,700.00
323,500.00
323,500.00
51,600.00
31,500.00
345,900.00
230,711.87
433,000.00
187,700.00
63,300.00
22,945.75
279,580.51
374,901.46
###
588,847.69
225,430.09
188,669.96
174,910.16
257,902.11
433,353.21
307,314.37
281,614.37
43,926.41
23,173.69
322,560.66
230,711.87
295,622.84
101,779.53
71,871.38
237,000,000.00
365,000,000.00
400,000,000.00
411,000,000.00
2,200,000.00
600,000.00
2,000,000.00
1.
U RAIAN
HARGA
ROYALTY
(Rp)
SATUAN
JARAK
QUARRY
( Km )
2.
M01 - P a s i r Pasang
M01 - P a s i r Beton
M02 - Batu Kali
M3
M3
M3
39,000.00
61,000.00
71,000.00
19.00
35.00
37.00
3.
M3
72,000.00
69.00
4.
M07 - G r a v e l
M3
35,000.00
10.00
5.
KG
9,100.00
90.00
6.
M16 - S i r t u
M3
41,000.00
48.00
7.
M3
22,500.00
10.00
M3
20,000.00
10.00
M3
33,000.00
31.00
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
7,45 km
Medan
km 000+000
7,45 km
5,00 km
10,00 km
Lokasi Quarry Patumbak
- Gravel
- Batu Kali
- Batu Belah
Base Camp
ke Rantau Prapat
Catatan :
Patumbak - Medan
Medan - Lokasi Proyek
Total Sumber Quarry Patumbak s/d Lokasi Proyek
= 10 km
= 165.20 km
= 175.20 km
= 8.73 km
= 176.73 km
= 50 km
= 45 km
= 18.73 km
= 10 km
No.
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke lokasi Base Camp
Harga satuan pasir di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume pasir
KODE
L
RpM01
RpE10
RpE09
Bil
KOEF.
SATUAN
19.00
1.00
1.00
1.00
1.42
Km
M3
Jam
Jam
ton/m3
0.93
0.90
0.83
M3
-
0.50
0.50
1.00
menit
menit
menit
URUTAN KERJA
Pasir digali dengan Excavator
Excavator sekaligus memuat pasir hasil
galian ke dalam Dump Truck
Dump Truck mengangkut pasir ke lokasi
Base Camp
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/Q1 x Bil)
- Waktu tempuh isi = (L/v1) x 60
- Waktu tempuh kosong = (L/v2) x 60
- Lain-lain
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
41.6826 M3 / Jam
8,382.39
Rupiah
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
10.14
57.00
38.00
1.00
106.14
menit
menit
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
3.30
Rp2
72,663.76
Rupiah
M01
120,046.15
Rupiah
M01
120,000.00
Rupiah
M3 / Jam
No.
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke Lokasi Pekerjaan
Harga satuan batu kali di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume batu kali
KODE
L
RpM02
RpE10
RpE09
Bil
KOEF.
SATUAN
37.00
1.00
1.00
1.00
1.50
Km
M3
Jam
Jam
ton/m3
0.93
0.75
0.83
M3
-
0.85
0.50
1.35
menit
menit
menit
URUTAN KERJA
Batu kali digali dengan Excavator
Excavator sekaligus memuat batu kali
hasil galian ke dalam Dump Truck
Dump Truck mengangkut batu kali ke
lokasi pekerjaan
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
- Waktu tempuh isi = (L/v1) x 60
- Waktu tempuh kosong = (L/v2) x 60
- Lain-lain
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
25.73 M3 / Jam
13,579.48
Rupiah
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
15.55
111.00
74.00
1.00
201.55
menit
menit
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
1.65
Rp2
145,756.65
Rupiah
M02
230,336.13
Rupiah
M02
230,300.00
Rupiah
M3 / Jam
No.
URAIAN
I.
1
2
3
4
5
6
7
8
9
II.
1
2
3
III.
3.a
3.b
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke Lokasi Pekerjaan
Harga satuan batu kali di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Harga Satuan Dasar Wheel Loader
Harga Satuan Upah Pekerja
Berat volume batu belah
KODE
L
RpM06
RpE10
RpE09
RpE15
RpL01
Bil
KOEF.
SATUAN
69.00
1.00
1.00
1.00
1.00
1.00
1.60
Km
M3
Jam
Jam
Jam
Jam
ton/m3
0.93
0.75
0.83
M3
-
0.75
0.50
1.25
menit
menit
menit
URUTAN KERJA
Batu kali digali dengan Excavator
Batu kali dibelah oleh Pekerja
Dengan Wheel Loader batu belah dimuat
ke Dump Truck yang mengangkut batu
belah ke lokasi pekerjaan
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
WHEEL LOADER
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
Waktu sklus
- Muat
- Lain-lain
(E15)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q2
27.7884 M3 / Jam
12,573.59
Rupiah
1.50
0.75
0.83
M3
-
0.75
0.50
1.25
menit
menit
menit
44.82 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q2) x RpE15
Rp2
7,389.56
Rupiah
No.
3.c
3.d
IV.
URAIAN
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
- Waktu tempuh isi = (L/v1) x 60
- Waktu tempuh kosong = (L/v2) x 60
- Lain-lain
KODE
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
KOEF.
SATUAN
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
13.49
207.00
138.00
1.00
359.49
menit
menit
menit
menit
menit
Q3
0.87
Rp3
277,316.34
M3 / Jam
Rupiah
PEKERJA
Produksi menentukan : Excavator
Hasil galian batu / hari = Q1 x 7 Jam
Kebutuhan Pekerja
Q1
Qt
P
27.7884 M3 / Jam
194.5188 M3 / 7 jam
15.00
Orang
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01
Rp4
3,211.77
Rupiah
M06
372,491.26
Rupiah
M06
372,500.00
Rupiah
No.
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke Lokasi Pekerjaan
Harga satuan Gravel di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume gravel
KODE
L
RpM07
RpE10
RpE09
Bil
KOEF.
SATUAN
10.00
1.00
1.00
1.00
2.20
Km
M3
Jam
Jam
ton/m3
0.93
0.75
0.83
M3
-
0.75
0.50
1.25
menit
menit
menit
URUTAN KERJA
Gravel digali dengan Excavator
Excavator sekaligus memuat gravel
hasil galian ke dalam Dump Truck
Dump Truck mengangkut gravel ke
lokasi pekerjaan
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
- Waktu tempuh isi = (L/v1) x 60
(E09)
V
Fa
v1
v2
Ts2
T1
T2
27.7884 M3 / Jam
12,573.59
Rupiah
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
9.81
30.00
menit
menit
T3
T4
Ts2
20.00
1.00
60.81
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
3.72
Rp2
64,504.81
Rupiah
M07
112,078.41
Rupiah
M07
112,100.00
Rupiah
M3 / Jam
No.
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke lokasi Base Camp
Harga satuan Sirtu di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume sirtu
KODE
L
RpM16
RpE10
RpE09
Bil
KOEF.
SATUAN
48.00
1.00
1.00
1.00
1.51
Km
M3
Jam
Jam
ton/m3
0.93
0.90
0.83
M3
-
0.50
0.50
1.00
menit
menit
menit
URUTAN KERJA
Sirtu digali dengan Excavator
Excavator sekaligus memuat sirtu hasil
galian ke dalam Dump Truck
Dump Truck mengangkut sirtu ke lokasi
Base Camp
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
(E09)
V
Fa
v1
v2
Ts2
T1
41.6826 M3 / Jam
8,382.39
Rupiah
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
9.53
menit
T2
T3
T4
Ts2
144.00
96.00
1.00
250.53
menit
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
1.32
Rp2
182,391.38
Rupiah
M16
231,773.78
Rupiah
M16
231,800.00
Rupiah
M3 / Jam
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke lokasi pekerjaan
Harga satuan pasir urug di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume pasir urug
KODE
L
RpM44
RpE10
RpE09
Bil
KOEF.
SATUAN
10.00
1.00
1.00
1.00
1.42
Km
M3
Jam
Jam
ton/m3
0.93
0.90
0.83
M3
-
0.50
0.50
1.00
menit
menit
menit
URUTAN KERJA
pasir urug digali dengan Excavator
Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
Dump Truck mengangkut pasir urug
ke lokasi pekerjaan
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
8,382.39
Rupiah
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
(E09)
V
Fa
v1
v2
Ts2
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
41.6826 M3 / Jam
T1
T2
T3
T4
Ts2
10.14
30.00
20.00
1.00
61.14
menit
menit
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
5.74
Rp2
41,855.74
Rupiah
M44
72,738.14
Rupiah
M44
72,700.00
Rupiah
M3 / Jam
No.
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke lokasi pekerjaan
Harga satuan pasir urug di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat isi volume pasir beton
KODE
L
RpM44
RpE10
RpE09
Bil
KOEF.
SATUAN
35.00
1.00
1.00
1.00
1.69
Km
M3
Jam
Jam
ton/m3
0.50
0.90
0.83
M3
-
0.50
0.50
1.00
menit
menit
menit
URUTAN KERJA
pasir urug digali dengan Excavator
Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
Dump Truck mengangkut pasir urug
ke lokasi pekerjaan
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
(E09)
V
Fa
v1
v2
Ts2
T1
22.41 M3 / Jam
15,591.25
Rupiah
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
15.84
menit
T1
T2
T4
Ts2
105.00
70.00
1.00
191.84
menit
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
1.54
Rp2
156,312.70
Rupiah
M44
232,903.95
Rupiah
M44
232,900.00
Rupiah
M3 / Jam
Y)
KET.
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Base Camp
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
7,45 km
Sp. Kawat
Km 172+900
ke Tanjung
Balai
ke Rantau Prapat
HAN
HARGA
SATUAN
(Rp.)
39,000.00
349,400.00
240,100.00
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
71,000.00
349,400.00
240,100.00
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
72,000.00
349,400.00
240,100.00
331,200.00
5,950.00
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
35,000.00
349,400.00
240,100.00
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
41,000.00
349,400.00
240,100.00
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
22,500.00
349,400.00
240,100.00
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
61,000.00
349,400.00
240,100.00
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
Uraian Kegiatan
1 Harga di Cibinong
Biaya
Rp/satuan Jumlah (Rp)
Rp/ton
2 Handling
Jumlah Kombinasi
(Rp)
280,000.00
280,000.00
3 Transport ke proyek
Rp/ton
4 Pembongkaran, gudang
Rp/ton
1,000.00
1,000.00
5 Waste 5%
Rp/ton
2,250.00
2,250.00
subtotal
Rp/ton
283,250.00
Rp/ton
14,162.50
total jumlah
Rp/ton
Rp/zak
297,412.50
14,870.63
Harga Netto
Harga setelah ditambah
Rp/zak
Rp/zak
25,000.00
39,870.63
7
8
Bahan : Aspal
No
Uraian Kegiatan
Biaya
Rp/satuan Jumlah (Rp)
Jumlah Kombinasi
(Rp)
1 Harga di pelabuhan
dari Jakarta
Rp/ton
214,700.00
214,700.00
2 Handling
Rp/ton
1,500.00
1,500.00
3 Transport ke proyek
Rp/ton
3,360.00
3,360.00
4 Pembongkaran, gudang
Rp/ton
1,500.00
1,500.00
5 Waste 2%
Rp/ton
4,300.00
4,300.00
subtotal
6 Keuntungan & Overhead
5 % (hanya utk pekerjaan
harian)
total jumlah
Rp/ton
225,360.00
Rp/ton
11,268.00
Rp/ton
Rp/kg
236,628.00
236.63
7
8
Harga Netto
Harga setelah ditambah
Rp/kg
Rp/kg
1,850.00
2,086.63
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
URAIAN
KO
DE
HP
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37
E38
E39
E40
E41
E42
E43
E44
E45
E46
E47
E48
E49
E50
E51
220.0
100.0
15.0
140.0 80.0
10.0
138.0
100.0
190.0
133.0
190.0
180.0
135.0
70.0
96.0
55.0
82.0
100.5
82.0
5.5
220.0
6.0 100.0
8.8
4.7
0.0
345.0
100.0
175.0
25.0
125.0
40.0
150.0
5.0
150.0
248.0
3.0 900.0
400.0
115.0
115.0
105.0
134.0
290.0
190.0
190.0
20.0
4.2
220.0
125.0
200.0
KAP.
50.0 T/Jam
80.0 Ton
800.0 Liter
5,000.0
5,000.00
250.0 Liter
15.0 Ton
3.5 Ton
10.0 Ton
0.9 M3
10.0 ton
135.0 KVA
10,800.0
10,800.00
0.8 M3
1.5 M3
8.0 Ton
8.1 Ton
9.0 Ton
7.1 Ton
25.0
25.00
50.0 T/Jam
4,000.0 Liter
835.00 Ton
121.00 Ton
1,330.00
1,330.00
2,005.00
2,005.00
8.00 M3
20.00 Ton
2.50 Ton
35.0 Ton
250.0 Amp
2,000.0 Meter
1,000.0 Liter
15.0 Ton
1,000.0 m
2.2 M
3.0 M
3.5 M
4,000.0 Liter
2.5 M
600.0 Liter
20.0 m3/jam
4,000.0 liter
4,000.0 liter
350.0 liter
80.0 KG
5.0 M3
60.0 CM
75.0 Ton
HARGA
ALAT
1,450,000,000
54,500,000
45,200,000
843,500,000
2,500,000
27,861
480,800
101,000
240,100
349,400
178,400
337,400
332,800
342,300
331,200
137,100
136,800
154,800
171,000
25,000
823,200
25,900
178,400
25,900
24,400
44,100
102,300
169,700
325,800
188,200.00
327,600
59,700
1,166,100
25,600
450,000,000
1,674,900
900,000,000
6,170,400
8,177,100
458,700
284,700
1,345,300
394,600
528,700
323,500
323,500
51,600
31,500
345,900
955,800
433,000
52
BLENDING EQUIPMENT
E52
50.0
30.0 Ton
187,700
53
E34a
40.0
54
55
MESIN LIER
PONTON ANGKUT
E35
E46 a
80.0
50.0
10.0 ton
50.0 ton
56
57
PONTON PANCANG
E47 a
100.0
100.0 ton
58
59
20,000.0 Liter
25,600
JAM KERJA
BIAYA
SEWA
KET.
ALAT/JAM
(di luar PPN)
3,698,800.00
204,917.85
52,592.72
402,248.80
110,700.00
27,861.00
480,800.00
101,000.00
240,100.00
349,400.00
178,400.00
337,400.00
332,800.00
342,300.00
331,200.00
137,100.00
136,800.00
154,800.00
171,000.00
25,900.00
823,200.00
25,900.00
178,400.00
59,700.00
24,400.00
44,100.00
102,300.00
169,700.00
325,800.00
188,200.00
327,600.00
60,200.00
955,800.00
25,600.00
433,600.00
1,397,900.00
323,900.00
6,170,400.00
8,177,100.00
458,700.00
284,700.00
408,100.00
394,600.00
528,700.00
323,500.00
323,500.00
51,600.00
31,500.00
345,900.00
230,711.87
433,000.00
T x Te1 x Te2 x Fa
187,700.00
63,300.00
102,300.00
92,500.00
149,800.00
A.
1.
2.
3.
4.
U RAIAN
KODE
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
Pw
Cp
A
W
B
KOEF.
TRONTON
150.0
15.0
10.0
1,500.0
450,000,000
5.
B.
1.
2.
3.
b. Asuransi, dll =
45,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.16275
(B-C)xD
W
43,941.26
600.00
44,541.26
0.002 x B
W
(E+F)
1.
144,562.50
2.
Pelumas
112,837.50
26,250
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
52,500.00
L
M
10,000.00
17,850.00
364,000.00
408,541.26
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
7.
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
167,490
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
198.83
1.67
200.50
0.002 x B
W
Pw
Cp
A
W
B
KOEF.
(E+F)
1.
191,208.00
2.
Pelumas
155,465.00
73
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
104.68
L
M
10,000.00
17,850.00
374,700.96
374,901.46
i
U1
U2
Mb
Ms
10.00
10,000.00
5,950.00
4,575.00
6,425.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
6.
7.
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Mp
25,075.00
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
90,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.16275
(B-C)xD
W
87,882.51
1,200.00
89,082.51
0.002 x B
W
Pw
Cp
A
W
B
KOEF.
(E+F)
1.
2,891.25
2.
Pelumas
2,256.75
52,500
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4.
5.
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
105,000.00
L
M
10,000.00
17,850.00
190,498.00
(H+I+K+L+M)
D.
279,580.51
E.
1.
LAIN - LAIN
Tingkat Suku Bunga
10.00
2.
3.
4.
5.
6.
7.
U1
U2
Mb
Ms
Mp
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
A.
1.
2.
3.
4.
U RAIAN
KODE
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
Pw
Cp
A
W
B
KOEF.
COLD RECYCLER
900.0
2,200
5.0
2,000.0
6,170,400
5.
B.
1.
2.
3.
b. Asuransi, dll =
617,040
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
732.48
6.17
738.65
0.002 x B
W
(E+F)
1.
693,900.00
2.
Pelumas
564,187.50
270
Biaya bengkel
3.
4.
5.
D.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
385.65
L
M
10,000.00
17,850.00
1,286,593.11
1,287,331.76
(H+I+K+L+M)
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
HOT RECYCLER
400.0
3
5.0
2,000.0
8,177,100
817,710
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
970.69
8.18
978.87
0.002 x B
W
Pw
Cp
A
W
B
KOEF.
(E+F)
1.
308,400.00
2.
Pelumas
250,750.00
358
(12,5 % - 17,5 %) x B
W
= ( 1 Orang / Jam ) x U1
511.07
10,000.00
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4.
Perawatan dan
perbaikan
Operator
5.
17,850.00
587,868.82
588,847.69
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
KOEF.
45,870
i x (1 + i)^A
(1 + i)^A - 1
0.31547
(B-C)xD
W
130.24
0.92
131.15
0.002 x B
W
=
(E+F)
1.
110,831.25
2.
Pelumas
86,508.75
29
Biaya bengkel
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
3.
4.
5.
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 13 Orang / Jam ) x U2
80.27
L
M
10,000.00
17,850.00
225,298.94
225,430.09
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
Pw
Cp
A
W
B
KOEF.
ASPHALT DISTRIBUTOR
115
4,000
5.0
2,000.0
284,700
28,470
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
33.80
0.28
34.08
88,665.00
0.002 x B
W
=
(E+F)
2.
Pelumas
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4.
5.
72,090.63
12
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
17.79
L
M
10,000.00
17,850.00
188,635.87
188,669.96
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
134,530
i x (1 + i)^A
(1 + i)^A - 1
0.22961
(B-C)xD
W
139.00
1.35
140.35
0.002 x B
W
=
Pw
Cp
A
W
B
KOEF.
(E+F)
1.
80,955.00
2.
Pelumas
65,821.88
59
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4.
5.
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
84.08
L
M
10,000.00
17,850.00
174,769.81
174,910.16
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
Pw
Cp
A
W
B
KOEF.
39,460
i x (1 + i)^A
(1 + i)^A - 1
0.16275
(B-C)xD
W
38.53
0.53
0.002 x B
W
(E+F)
39.06
1.
129,142.50
2.
Pelumas
100,801.50
23
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
46.04
L
M
10,000.00
17,850.00
257,863.06
257,902.11
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
Pw
Cp
A
W
B
KOEF.
CONCRETE BREAKER
290
20.00
5.0
2,000.0
528,700
52,870
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
62.76
W
b. Asuransi, dll =
0.002 x B
W
(E+F)
0.53
63.29
1.
223,590.00
2.
Pelumas
181,793.75
23
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4.
5.
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
33.04
L
M
10,000.00
17,850.00
433,289.92
433,353.21
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A.
1.
2.
3.
4.
5.
B.
1.
U RAIAN
KODE
KOEF.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
Pw
Cp
A
W
B
Ca
4,000.00
32,350
ASPAHLT TANKER
190
4,000.00
6.0
2,000.0
323,500
2.
i x (1 + i)^A
(1 + i)^A - 1
0.22961
3.
(B-C)xD
W
33.43
0.32
(E+F)
33.75
1.
H1
H2
146,490.00
25,700.00
2.
Pelumas
119,106.25
14
b. Asuransi, dll =
0.002 x B
W
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
20.22
L
M
10,000.00
5,950.00
307,280.62
307,314.37
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A.
1.
2.
3.
4.
U RAIAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
KODE
Pw
Cp
A
W
B
KOEF.
CEMENT TANKER
190
4,000.00
6.0
2,000.0
323,500
B.
1.
2.
3.
b. Asuransi, dll =
32,350
i x (1 + i)^A
(1 + i)^A - 1
0.22961
(B-C)xD
W
33.43
0.32
33.75
0.002 x B
W
(E+F)
1.
146,490.00
2.
Pelumas
119,106.25
14
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
20.22
L
M
10,000.00
5,950.00
281,580.62
281,614.37
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A.
1.
2.
3.
4.
U RAIAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
KODE
Pw
Cp
A
W
KOEF.
c. Harga Alat
B.
1.
51,600
5,160
i x (1 + i)^A
(1 + i)^A - 1
0.57619
(B-C)xD
W
13.38
0.05
13.43
2.
3.
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
15,420.00
2.
Pelumas
12,537.50
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
3.23
L
M
10,000.00
5,950.00
43,912.98
43,926.41
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A.
1.
U RAIAN
URAIAN PERALATAN
Jenis Peralatan
KODE
KOEF.
VIBRATING RAMMER
2.
3.
4.
B.
1.
Tenaga
Kapasitas
Alat Baru
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
2.
3.
b. Asuransi, dll =
C.
4
80.00
4.0
1,000.0
31,500
3,150
i x (1 + i)^A
(1 + i)^A - 1
0.31547
(B-C)xD
W
8.94
0.06
9.01
0.002 x B
W
Pw
Cp
A
W
B
(E+F)
1.
4,047.75
2.
Pelumas
3,159.45
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
5.51
L
M
10,000.00
5,950.00
23,164.68
23,173.69
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
KOEF.
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
34,590
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
41.06
0.35
41.41
0.002 x B
W
Pw
Cp
A
W
B
(E+F)
1.
169,620.00
2.
Pelumas
137,912.50
15
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
21.62
L
M
10,000.00
5,950.00
323,519.25
323,560.66
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
95,580
i x (1 + i)^A
(1 + i)^A - 1
0.16275
(B-C)xD
W
93.33
1.27
94.61
0.002 x B
W
Pw
Cp
A
W
B
KOEF.
(E+F)
1.
120,468.75
2.
Pelumas
94,031.25
56
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
111.51
L
M
10,000.00
5,950.00
230,617.27
230,711.87
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
7.
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
43,300
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
51.40
0.43
51.83
0.002 x B
W
KOEF.
(E+F)
1.
154,200.00
2.
Pelumas
125,375.00
19
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
27.06
L
M
10,000.00
5,950.00
295,571.01
295,622.84
i
U1
10.00
10,000.00
(H+I+K+L+M)
D.
E.
1.
2.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
3.
4.
5.
6.
7.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
BLENDING EQUIPMENT
50
30.00
10.0
1,500.0
187,700
18,770
i x (1 + i)^A
(1 + i)^A - 1
0.16275
(B-C)xD
W
18.33
0.25
18.58
0.002 x B
W
Pw
Cp
A
W
B
KOEF.
(E+F)
1.
48,187.50
2.
Pelumas
37,612.50
11
Biaya bengkel
3.
4.
5.
D.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
0.0000
L
M
10,000.00
5,950.00
101,760.95
101,779.53
(H+I+K+L+M)
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
10.00
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
SATUAN
RONTON
E35
HP
Ton
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
UE'
###
E35
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
###
###
###
###
###
###
###
###
###
###
###
###
HARGA
SATUAN
KET.
BARU
Depresiasi
LLING MACHINE
HP
m
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
E37
E38
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
E40
###
###
###
###
###
###
###
###
###
###
###
###
Liter
###
Kondisi Alat
Nilai B' dari
SATUAN
KET.
##
E41
RILL BREAKER
E36
HP
Tahun
Jam
Rupiah
Rupiah
-
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Depresiasi
##
E42
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Depresiasi
#
E43
###
###
###
###
###
###
###
###
###
###
###
###
###
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Kondisi Alat
Nilai B' dari
##
SATUAN
KET.
###
###
###
D RECYCLER
E38
HP
M
Tahun
Jam
Rupiah
Rupiah
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Depresiasi
##
E45
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
##
E46
###
###
###
###
###
###
###
###
###
###
###
###
###
###
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Kondisi Alat
Nilai B' dari
Depresiasi
E47
###
SATUAN
KET.
###
###
###
RECYCLER
E39
HP
M
Tahun
Jam
Rupiah
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Depresiasi
#
E48
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Rupiah
Rupiah
Rupiah
Depresiasi
##
E49
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Kondisi Alat
Nilai B' dari
Depresiasi
#
E50
###
###
SATUAN
KET.
###
###
###
(CHIP) SPREADER
HP
M
Tahun
Jam
Rupiah
E40
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
##
E51
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Rupiah
Rupiah
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
SATUAN
KET.
###
###
###
T DISTRIBUTOR
HP
Liter
Tahun
Jam
Rupiah
E41
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
-
Rupiah
Rupiah
Rupiah
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Kondisi Alat
Nilai B' dari
Depresiasi
#
E
###
###
###
###
###
###
SATUAN
KET.
###
###
###
FORM PAVER
E42
HP
M
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Kondisi Alat
Nilai B' dari
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Depresiasi
#
E
###
###
###
###
###
###
###
###
SATUAN
KET.
###
###
###
E43
HP
Liter
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Kondisi Alat
Nilai B' dari
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Kondisi Alat
Nilai B' dari
Depresiasi
#
E
###
###
###
###
###
###
###
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
###
###
###
SATUAN
KET.
###
> 15th ?
Kondisi Alat
ETE BREAKER
E44
HP
m3/jam
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Kondisi Alat
Nilai B' dari
Rupiah
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
###
###
###
SATUAN
KET.
Kondisi Alat
Nilai B' dari
Depresiasi
HLT TANKER
E45
HP
liter
Tahun
Jam
Rupiah
liter
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Kondisi Alat
Nilai B' dari
Rupiah
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Kondisi Alat
Nilai B' dari
Rupiah
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
###
###
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
###
> 15th ?
Kondisi Alat
SATUAN
KET.
Depresiasi
ENT TANKER
E46
HP
liter
Tahun
Jam
Rupiah
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
-
Kondisi Alat
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Kondisi Alat
Rupiah
Rupiah
###
###
###
###
###
###
###
###
###
###
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
#
E
###
###
###
###
###
SATUAN
KET.
###
###
###
E47
###
###
> 15th ?
Kondisi Alat
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN
TING RAMMER
KET.
E48
HP
KG
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN
KET.
XER (AGITATOR)
HP
M3
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
E49
SATUAN
PILE MACHINE
KET.
E50
HP
CM
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
KET.
E51
Rp./Jam
Liter
Liter
Liter
SATUAN
NG EQUIPMENT
KET.
E52
HP
Ton
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
ITEM PEMBAYARAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN
No.
III.2.
III.3.
3.a.
U RAIAN
KODE
KOEFISIEN
70.00
HSAk
326,724.15
H
Hs1
30.00
326,724.15
SATUAN
KETERANGAN
%
Rupiah
Di Luar PPN
%
Rupiah
per 1 M3
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: AGREGAT KELAS A (kondisi lepas)
: PENGADAAN AGREGAT KELAS A
: M3
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
jam
jam
:
:
:
HARGA
SATUAN
(Rp.)
0.0630
0.0315
5,950.00
7,130.00
BAHAN
1.
2.
3
Agregat 20-30
Agregat 5-10 & 10-20
Pasir Urug
M93
M92
M44
M3
M3
M3
0.2940
0.4410
0.3150
326,724.15
326,724.15
72,700.00
PERALATAN
Wheel Loader
Blending Equpment
Alat Bantu
(E15)
(E52)
jam
jam
Ls
0.0315
0.0482
1.0000
331,200.00
187,700.00
0.00
JUMLAH
HARGA
(Rp.)
TUAN
JUMLAH
HARGA
(Rp.)
374.83
224.58
599.42
96,056.90
144,085.35
22,900.50
263,042.75
10,432.32
9,045.78
0.00
19,478.10
283,120.27
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: AGREGAT KELAS B (kondisi lepas)
: PENGADAAN AGREGAT KELAS B
: M3
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
jam
jam
:
:
:
HARGA
SATUAN
(Rp.)
0.0630
0.0315
5,950.00
7,130.00
BAHAN
1.
2.
3
Aggregat 20-30
Agg 5 - 10 & 10 - 20
Sirtu
M93
M92
M16
M3
M3
M3
0.1890
0.1890
0.6720
326,724.15
326,724.15
231,800.00
PERALATAN
Wheel Loader
Blending Equpment
Alat Bantu
(E15)
(E52)
jam
jam
Ls
0.0315
0.0482
1.0000
331,200.00
187,700.00
0.00
JUMLAH
HARGA
(Rp.)
TUAN
JUMLAH
HARGA
(Rp.)
374.83
224.58
599.42
61,750.87
61,750.87
155,769.60
279,271.33
10,432.32
9,045.78
0.00
19,478.10
299,348.85
ITEM PEMBAYARAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN
No.
I
1
2
3
: AGREGAT KELAS C
: PENGADAAN AGREGAT KELAS C
: M3
U RAIAN
ASUMSI
Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
Kegiatan dilakukan di dalam lokasi Base Camp
Proporsi campuran : - Agregat Kasar
- Pasir
Ak
Ps
Harga Satuan :
- Agregat Kasar
- Pasir
HSAk
HSPs
5
6
7
- Wheel Loader
- Wheel Loader
- Wheel Loader
Rp1
Fa1
Cp2
II
32.50
67.50
326,724.15
120,000.00
%
%
Rp./M3
Rp./M3
331,200.00 Rp./Jam
0.83
1.50
M3
METHODE PELAKSANAAN
1
III.1
1.a.
1.b.
III.2
- Agregat Kasar
= Ak x 1 M3
- Pasir
= Ps x 1 M3
- Tanah
= Tn x 1 M3
- Total volume agregat = Vk + Vp + Vt
Waktu pencampuran (blending) oleh Blending Equipmen
Vk
Vp
Vt
Va
0.325
0.675
0.000
1.000
M3
M3
M3
M3
Tc
0.083 Jam/M3
2.a.
Agregat Kasar
= Vk x HSAk
Hs1
39,000.00
Rupiah
2.b.
Pasir
= Vh x HSPs
Hs2
220,538.80
Rupiah
2.c.
Tanah
= Vs x HSTn
Hs3
0.00
Rupiah
2.d.
Biaya Pencampuran
= Tc x Rp1
Hs4
27,600.00
Rupiah
2.e.
HSAB
287,138.80
Rupiah
KETERANGAN
Kap. Bucket
Di luar PPN
: 7.6 (17)
: Pemancangan Tiang Pancang Beton di Air
: M1
:
:
No.
URAIAN
TENAGA
1
2
3
Pekerja Terlatih
Tukang
Mandor
SATUAN
KUANTITAS
BIAYA SATUAN
(Rp)
Jam
Jam
Jam
15.1389
3.0278
0.7569
5,950.00
7,760.00
10,000.00
Kg
0.1389
25,000.00
0.3288
0.3288
0.3288
0.3288
0.3288
0.1355
0.1355
0.1355
1.0000
188,200.00
149,800.00
327,600.00
92,500.00
480,800.00
115,000.00
337,400.00
102,300.00
2,000.00
Sub Total A
B
BAHAN
Kawat Las
Sub Total B
C
PERALATAN
1
2
3
4
5
6
7
8
9
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Ls
D
E
F
Sub Total C
Jumlah
Biaya Umum dan Keuntungan
Harga Satuan (Rp)
:(A+B+C)
: ( 15% x D )
:(D+E)
Note: SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
JUMLAH
(Rp)
90,076.34
23,495.54
7,569.44
121,141.32
3,472.22
3,472.22
61,887.43
49,260.03
107,727.54
30,417.58
158,105.62
15,582.66
45,718.16
13,861.79
2,000.00
484,560.81
609,174.35
91,376.15
700,550.51
: 7.6 (17)
: Pemancangan Tiang Pancang Beton
: M1
:
:
No.
SATUAN
URAIAN
KUANTITAS
TENAGA
1
2
3
Pekerja Terlatih
Tukang
Mandor
BIAYA SATUAN
(Rp)
Jam
Jam
Jam
9.6848
1.9370
0.4842
5,950.00
7,760.00
10,000.00
Kg
0.1389
25,000.00
0.2630
0.2630
0.2630
0.2630
0.2630
0.1355
0.1355
0.1355
1.0000
188,200.00
149,800.00
327,600.00
92,500.00
480,800.00
115,000.00
337,400.00
102,300.00
2,000.00
Sub Total A
B
BAHAN
Kawat Las
Sub Total B
C
PERALATAN
1
2
3
4
5
6
7
8
9
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Ls
D
E
F
Sub Total C
Jumlah
Biaya Umum dan Keuntungan
Harga Satuan (Rp)
:(A+B+C)
: ( 15% x D )
:(D+E)
Note:1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
JUMLAH
(Rp)
57,624.72
15,030.85
4,842.41
77,497.98
3,472.22
3,472.22
49,499.58
39,399.77
86,163.99
24,328.97
126,458.02
15,582.66
45,718.16
13,861.79
2,000.00
403,012.93
483,983.13
72,597.47
556,580.60
: 2.4 (3)
Analisa LI-243
: Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan
: M'
URAIAN ANALISA HARGA SATUAN
No.
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
1.
2.
2.b.
3.
4.
5.
U RAIAN
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan terpengaruh oleh aliran air tanah
Jam kerja efektif per-hari
Diameter dalam pipa
Material penyaring terdiri dari material porus
Penyangga sambungan pipa dengan mortar
7.
Tk
d
KOEF.
SATUAN
7.00
0.10
Jam
M
1.0500
0.0003
0.0900
0.0002
-
M'
M3
Kg
M3
Ls
KETERANGAN
URUTAN KERJA
Semua material diterima di lokasi pekerjaan
Pekerjaan dilakukan secara manual dengan
menggunakan alat bantu kecil
Pekerjaan galian dibayar tersendiri.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Diperlukan material :
- Pipa Porous
- Mortar (penyangga sambungan pipa) = 2 x (0.05x0.05x0.05)
- Semen
= 20% x Mr x Bj Mortar 1.8 T/m3
- Pasir
= 80% x Mr
- Filter stripe dan lain2 (pada sambungan)
ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Pacul = 2 buah
- Alat-alat kecil lain
TENAGA
Produksi yang dapat diselesaikan / hari
Kebutuhan tenaga :
- Pekerja
- Tukang
- Mandor
Koefisien tenaga / M1 :
- Pekerja
= (Tk x P) : Qt
- Tukang
= (Tk x T) : Qt
- Mandor
= (Tk x M) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.
6.
KODE
66,451.11 / M'
(M25)
Mr
(M12)
(M01)
-
Lump Sump
Qt
12.00
M'
P
T
M
2.00
1.00
1.00
orang
orang
orang
(L01)
(L02)
(L03)
1.1667
0.5833
0.5833
Jam
Jam
Jam
Analisa EI-314
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
0
: SUL SEL / KAB. WAJO
: 3.1 (4)
PERKIRAAN VOL. PEK.
: Galian Struktur dengan Kedalaman 2 - 4 TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.0829
0.0083
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
BAHAN
1.
2
Urugan Pilihan
(EI-322)
Bahan pengaman tebing galian
M3
Ls
1.0000
1.0000
PERALATAN
Excavator
Bulldozer
Alat bantu
(E10)
(E04)
Jam
Jam
Ls
0.0083
0.014502
1.0000
3
4
153.86
95,286,250.38
0.99
JUMLAH
HARGA
(Rp.)
493.33
59.12
552.44
1.00
529,242.00
:
:
:
1.00
529,242.00
529,243.00
349,400.00
402,248.80
0.00
2,896.96
5,833.59
0.00
8,730.55
No.
I.
1
2
3
4
5
6
7
8
9
10
II.
1
2
3
4
: 4.2 (1)
: Lps. Pond. Agg. Kls. A
: M3
URAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis Agregat padat
Berat isi padat
Jam kerja efektif per-hari
Lebar bahu jalan
Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Pasir Urug
Berat Isi Agregat (lepas)
Faktor kehilangan
- Agregat A
1.
BAHAN
- Agregat A
= 1 M3 x (Bip/Bil) x Fh
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Memuat dan lain-lain
Kap. Prod. / jam =
Koefisien Alat / M3
2.b.
KODE
L
t
Bip
Tk
Lb
20-30
KOEF.
SATUAN
PU
Bil
Fh
2.00
0.15
1.81
7.00
1.00
28.00
42.00
30.00
1.51
1.05
KM
M
Jam
M
%
%
%
ton/m3
(M26)
1.25861
M3
(E15)
V
Fb
Fa
1.50
0.85
0.83
M3
-
Ts1
0.45
menit
Q1
141.10
M3
(E15)
0.0071
Jam
(E08)
V
Fa
v1
v2
3.50
0.80
20.00
30.00
ton
KM / Jam
KM / Jam
T1
T2
T3
T4
Ts2
0.99
6.00
4.00
2.00
12.99
menit
menit
menit
menit
menit
5-10&10-20
KETERANGAN
Gradasi harus
memenuhi Spec.
URUTAN KERJA
Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan Motor Grader
Hamparan Agregat dibasahi dengan Water Tank Truck
sebelum dipadatkan dengan Tandem Roller
Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
III.
2.
2.a.
Analisa EI-421
V x Fb x Fa x 60
Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
- Waktu memuat =
(V x 60)/(Q1 x Bil)
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- Lain-lain termasuk menurunkan Agregat
(lepas)
kondisi sedang
panduan
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
III.
1.
2.
2.a.
: 5.1 (1)
: Lps. Pond. Agg. Kls. A
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis agregat padat
Berat isi padat
Jam kerja efektif per-hari
Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Pasir Urug
Berat Isi Agregat (lepas)
Faktor kehilangan
- Agregat A
KODE
L
t
Bip
Tk
20-30
5-10&10-20
PU
Bil
Fh1
KOEF.
2.00
0.15
1.81
7.00
28.00
42.00
30.00
1.51
1.05
SATUAN
KM
M
jam
%
%
%
ton/m3
URUTAN KERJA
Wheel Loader memuat Agregat campuran ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat kelas A ke lokasi
pekerjaan dan dihampar dengan Motor Grader
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Tandem
Roller
Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
- Agregat A
= 1 M3 x (Bip/Bil) x Fh
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Memuat dan lain-lain
Kap. Prod. / jam =
Koefisien Alat / M3
2.b.
V x Fb x Fa x 60
Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
- Waktu memuat =
V x 60/Q1 x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
(M26)
###
M3
(E15)
V
Fb
Fa
1.50
0.85
0.83
M3
-
Ts1
0.45
menit
Q1
141.10
M3
(E15)
0.0071
jam
(E08)
V
Fa
v1
v2
3.50
0.80
20.00
30.00
ton
KM/jam
KM/jam
T1
T2
0.99
6.01
menit
menit
T3
T4
Ts2
4.01
2.00
13.00
menit
menit
menit
Analisa EI-511
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Gradasi harus
memenuhi Spec.
(lepas)
kondisi sedang
panduan
No.
U RAIAN
I.
1
2
3
4
5
6
7
8
II
1
2
3
III.
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Kadar semen minimum (spesifikasi)
Perbandingan air/Semen maksimum (spesifikasi)
Perbandingan camp.
1 : Semen
3 : Pasir
6 : Kerikil pecah
Berat jenis material :
- Beton
- Semen
- Pasir
- Kerikil
KODE
L
Tk
Ks
Wcr
Sm
Ps
Kr
D1
D2
D3
D4
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete mixer
Beton di-cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1
1.a.
1.b.
1.c.
1.d.
1.e.
2
2.a.
: 5.4 (1)
: Cemen Treated Sub Base (CTSB)
: M3
BAHAN
Semen PC
Pasir beton
Kerikil pecah
kayu perancah
paku
ALAT
CONCRETE MIXER
Kapasitas alat
Faktor efisiensi alat
Waktu siklus :
(T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
(M12)
(M01)
(M03)
(M19)
(M18)
(E06)
V
Fa
Ts
T1
T2
T3
T4
Ts
Q1
Koefisien prod,/Jam=1 : Q1
(E06)
: 5.4 (1)
: Cemen Treated Sub Base (CTSB)
: M3
No.
2.b
U RAIAN
(E23)
V
Wc
Fa
n
Q2
Koefisien Alat / M3 = 1 : Q2
2.c
(E23)
CONCRETE VIBRATOR
Kebutuhan alat penggetar beton ini disesuikan dengan
kapasitas produksi alat pencampur (concrete mixer)
Kap. Prod. / jam = Kap. prod./ Jam alat concrete mixer
Koefisien alat / M3 = 1 : Q3
ALAT BANTU
Diperlukan :
- Sekop
- Pacul
- Sendok semen
- Ember cor
- Gerobak Dorong
Q3
(E20)
= 2 buah
= 2 buah
= 2 buah
= 4 buah
= 1 buah
TENAGA
Produksi beton dalam 1 hari
= Tk x Q1
KODE
Qt
M
Tb
P
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
(L03)
(L03)
(L03)
: 5.4 (1)
: Cemen Treated Sub Base (CTSB)
: M3
No.
5.
U RAIAN
831,949.06 / M3.
6.
7.
KODE
: 5.6 (1)
: Perkerasan Beton dengan Beton K-300
: M3
No.
U RAIAN
I.
1
2
3
4
5
6
7
8
9
10
II.
1
2
3
III.
1.
1.a.
1.b.
1.c.
2.
2.a.
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Kadar Semen Minimum (Spesifikasi)
Ukuran Agregat Maksimum
Perbandingan Air/Semen Maksimum (Spesifikasi)
Perbandingan Camp.
1 : Semen
2 : Pasir
3.1 : Agregat Kasar
Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
KODE
L
Tk
Ks
Ag
Wcr
Sm
Ps
Kr
D1
D2
D3
D4
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
Beton di cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Semen (PC)
Pasir Beton
Agregat Kasar
Kayu perancah
Paku
ALAT
CONCRETE PAN MIXER (BATCHING PLANT)
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
(T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
V x Fa x 1
(M12)
(M01)
(M03)
(M19)
(M18)
(E43)
V
Fa
Ts
T1
T2
T3
T4
Ts
Q1
1000 x Ts
Koefisien Alat / M3
= 1 : Q1
: 5.6 (1)
(E43)
JENIS PEKERJAAN
SATUAN PEMBAYARAN
No.
2.b.
U RAIAN
2.c.
= 1 : Q2
CONCRETE VIBRATOR
Kebutuhan Alat Penggetar Beton ini disesuaikan dengan kapasitas
produksi Alat Pencampur (Concrete Mixer)
Kap. Prod. / jam
Koefisien Alat / M3
2.d.
Koefisien Alat / M3
Koefisien Alat / M3
Q3
(E23)
(E20)
Q3
(E20)
(E44)
V
Fa
TRUK MIXER
Kapasitas drum
Faktor efisiensi alat
Kecepatan rata rata bermuatan
Kecepatan rata rata kosong
Waktu siklus :
- waktu tempuh isi L : Q1 x 60
- tempuh kosong
L x 60 : v2
- waktu lain-lain (bongkar & muat)
2.f
= 1 : Q3
CONCRETE PUMP
Kapasitas Alat
Faktor Efiesiensi Alat
Kap. Prod. / jam
2.e
(E23)
V
Wc
Fa
n
V x Fa x n
Wc
Koefisien Alat / M3
KODE
V x Fa x 60
Ts
= 1 : Q5
GENSET
kebutuhan genset disesuikan dengan kapasitas
produksi alat pencampur (baching plant)
Kap. Prod. / jam
Kap. Prod. / Jam baching plant
Q2
(E44)
(E49)
V
Fa
v1
v2
T1
T2
T3
Ts
Q5
(E49)
Koefisien Alat / M3
= 1 : Q6
(E44)
: 5.6 (1)
: Perkerasan Beton dengan Beton K-300
: M3
No.
U RAIAN
KODE
ALAT BANTU
Diperlukan :
- Sekop
-pacul
-Sendok semen
-Ember Cor
-Alat Finishing
-Pelepaan
3
TENAGA
Produksi beton dalam 1 hari
Tk x Q1
Qt
M
Tb
P
=(Tk x M) : Qt
=(Tk x Tb) : Qt
=(Tk x P) : Qt
(L.03)
(L.02)
(L.01)
BESI
Besi dowel berdasarkan analisa El-732
Volume beton
6.21 m3/segmen
Produksi besi
12.64 kg
Kebutuhan besi = Db : Vb
Vb
Db
BD
Vb
Db
BD
Vb
Db
BD
1,228,361.92 / M3
Analisa EI-532
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN KETERANGAN
2.00 KM
7.00 jam
250.00 Kg/m3
0.60
10.00 %
30.00 %
60.00 %
2.25
1.44
1.80
1.80
230.625
0.384
0.769
0.013
0.050
berdasarkan
JMF & sesuai
dgn spesifikasi
T/M3
T/M3
T/M3
T/M3
Kg
M3
M3
M3
Kg
Agregat Kasar
250.0000 Liter
0.8300
3.0000
4.0000
1.0000
1.5000
9.5000
1.3105
menit
menit
menit
menit
menit
M3
0.7631
jam
Analisa EI-532
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN KETERANGAN
4.000
0.138
0.830
1.000
M3
M3
kali
23.993
M3
0.042
jam
1.311
M3
0.763
jam
9.174
M3
1.000
1.000
6.000
orang
orang
orang
0.763
0.763
4.578
jam
jam
jam
Analisa EI-532
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN KETERANGAN
Analisa El-55
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN KETERANGAN
2.00
7.00
365
19
0.45
16.39
32.79
50.82
KM
jam
Kg/M3
mm
%
%
%
2.25
1.44
1.80
1.80
T/M3
T/M3
T/M3
T/M3
372.541
0.4139
0.6416
0.0250
0.2500
Kg
M3
M3
Kg
Kg
50.00
0.83
liter
-
1.00
1.00
menit
menit
menit
menit
menit
41.500
M3/jam
Berdasarkan
JMF & sesuai
dgn Spesifikasi
745
1,155
0.0241
jam
Analisa El-55
KOEF.
SATUAN KETERANGAN
4.00
0.168
0.83
1.00
M3
M3
kali
19.804
M3
0.0505
jam
41.50
m3
0.0241
jam
M3
41.50
m3
0.0241
jam
5.0000
0.8300
20.0000
30.0000
M3
km/jam
km/jam
6.0000
menit
4.0000
menit
1.0000
menit
11.0000 menit
22.6364
M3
0.0442
jam
41.50
m3
0.0241
jam
Analisa El-55
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN KETERANGAN
290.50
1
4
16
org
org
org
0.0241
0.0964
0.3855
jam
jam
jam
6.210
12.640
2.035
M3
Kg
Kg/m3
6.210
13.430
2.163
M3
Kg
Kg/m3
6.210
49.984
8.049
M3
Kg
Kg/m3
PROYEK
NAMA KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
4.578
0.763
0.763
JUMLAH HARGA TENAGA
B.
BAHAN
1.
2.
3.
4.
5.
Semen
Pasir
Agregat Kasar
Kayu perancah
Paku
(M12)
(M01)
(M03)
(M19)
(M18)
Kg
M3
M3
M3
Kg
230.625
0.384
0.769
0.013
0.050
JUMLAH HARGA BAHAN
C.
1.
2.
3.
4.
PERALATAN
Conc. Mixer
Water Tanker
Conc. Vivrator
Alat Bantu
(E06)
(E23)
(E20)
jam
jam
jam
Ls
0.7631
0.0417
0.7631
1.0000
D.
E.
F.
Note: 1
2
3
4
SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan d
mata pembayaran.
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termas
yang dibayar dari kontrak) dan biaya-biaya lainnya.
PROYEK
NAMA KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
0.386
(0.096)
0.024
JUMLAH HARGA TENAGA
945
1210
B.
BAHAN
1.
2.
3.
4
5
6
7
8
Semen
Pasir beton
Agregat Kasar
(M12)
(M01a)
(M03)
kayu perancah
Paku
Besi dowel berdasarkan analisa El.733
Besi tie bar berdasarkan analisa El.732
Besi praktis berdasarkan analisa El.731
Kg
M3
M3
M3
Kg
Kg/m3
Kg/m3
Kg/m3
372.5410
0.4139
0.6416
0.0250
0.2500
2.0354
2.1626
8.0490
JUMLAH HARGA BAHAN
C.
PERALATAN
1.
2.
3.
4.
5
6
7
BTCHING PLANT
Water Tank Truck
Concrete Vibrator
Concrete Pump
Truck Mixer
Genset
Alat Bantu
(E43)
(E23)
(E20)
(E44)
(E49)
(E12)
jam
jam
jam
jam
jam
jam
Ls
0.0241
0.0505
0.0241
0.0241
0.0442
0.0241
1.0000
JUMLAH HARGA PERALATAN
D.
E.
F.
Note: 1
2
3
4
panjang dowel
10 mm
16 mm
10 mm
16 mm
panjang dowel
jarak
lebar
0.85 m
0.62 kg
1.58 kg
0.62 kg
1.58 kg
0.8 m
0.5 m
4.5 m
volume beton
6
6.21
4.5
0.75 cm
0.23
dowel
a.
dia. 16 - 50
n
10 bh
12.64 kg
0.8
b.
dia.12 - 30
n
c.
16
7.44 kg
4' dia.12
11.16 kg
31.24 kg
JUMLAH
TIEBAR
a.
dia. 16 - 50
n
b.
10 bh
13.43 kg
dia.12 - 30
16
20.224 kg
c.
4' dia.12
JUMLAH
11.16 kg
44.814 kg
TOTAL
76.054 KG
tul praktis
49.984
panjang beton
jumlah segmen
jmlh dowel 1 segmen dia 16
berat dia 16
Panjang dowel
Berat dowel dia 16
Koefisien Besi
kebutuhan
1770.0000
354.0000
16.0000
2.9800
0.6000
10098.6240
1626.1874
0.0038 6.7591839
panjang beton
Besi arah memanjang
Besi arah melintang
berat dia 10
Jumlah Tie bar
Berat Tie Bar
Koefisien Bvesi
kebutuhan
200.0000
194.0000
1743.8200
0.6250
4.0000
4844.5500
780.1208
0.4913 98.259494
panjang beton
Panjang besi praktis
Besi arah melintang
berat dia 10
Jumlah Tie bar
Berat Tie Bar
Koefisien Bvesi
kebutuhan
200.0000
0.5700
953.4200
0.6200
4.0000
2365.8952
380.9815
0.0000
Analisa EI-511
R UNTUK
ASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,174.00
232,900.00
326,724.15
1,764,140.00
37,550.00
JUMLAH HARGA BAHAN
27,861.00
178,400.00
25,900.00
1,000.00
:
:
:
56.25
34,272,474.39
0.77
JUMLAH
HARGA
(Rp.)
27,240.96
5,921.29
5,440.56
38,602.81
270,753.75
89,520.94
251,169.19
22,051.75
1,877.50
635,373.13
21,259.40
7,435.57
19,763.05
1,000.00
49,458.02
723,433.96
108,515.09
831,949.06
Analisa EI-55
R UNTUK
ASING HARGA SATUAN
:
:
:
258.75
300,811,104.23
6.7529021663
HARGA
SATUAN
(Rp.)
5,142.857
6,857.143
9,428.571
JUMLAH HARGA TENAGA
1,174.00
232,900.00
326,724.15
1,764,140.00
37,550.00
17,063.30
18,163.30
17,063.30
JUMLAH HARGA BAHAN
521800
171,560.00
22,080.00
614,400.00
298,000.00
316,030.00
1,000.00
JUMLAH HARGA PERALATAN
1,982.79
(660.93)
227.19
1,549.05
437,363.11
96,405.33
209,625.68
44,103.50
9,387.50
34,731.10
39,280.70
137,341.70
1,008,238.62
12,573.49
8,662.92
532.05
14,804.82
13,164.66
7,615.18
1,000.00
58,353.13
1,068,140.80
160,221.12
1,228,361.92
Kerja dan Peralatan, volume dan/atau ukuran
No.
I.
1
2
3
4
5
6
7
8
9
10
11
12
II.
1
2
III.
: 6.3(7c)
: Laston Lapis Antara Perata (AC-Base(L)) (gradasi halus/kasar)
: Ton
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : rusak
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal Lapis (AC) padat
Jam kerja efektif per-hari
Faktor kehilanganmaterial :
- Agregat
- Aspal
Berat isi Agregat (padat)
Berat Isi Agregat (lepas)
Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm
- Agr Pch Mesin 5 - 10 & 10 - 20 mm
- Agregat Pecah Mesin 0 - 5 mm
- Semen
- Asphalt
- Anti Stripping Agent
Berat Isi bahan :
- AC-Base
- Agr Pch Mesin 20 - 30 mm
- Agr Pch Mesin 5 - 10 & 10 - 20 mm
- Agr Pch Mesin 0 - 5 mm
Jarak Stock pile ke Cold Bin
KODE
L
t
Tk
Fh1
Fh2
Bip
Bil
20-30
5-10&10-20
0-5
FF
As
Asa
D1
D2
D3
D4
l
1.
1.a.
1.b.
1.c.
BAHAN
Agr 20-30
Agr 5-10 & 10-20
Agr 0-5
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
= ("20-30" x Fh1) : D2
= ("5-10&10-20" x Fh1) : D3
= ("0-5" x Fh1) : D4
(M93)
(M92)
(M91)
(E15)
V
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
T1 + T2 + T3
- Kecepatan maju rata rata
- Kecepatan kembali rata rata
- Muat ke Bin
=
(l x 60) / Vf
- Kembali ke Stock pile = (l x 60) / Vr
- Lain - lain (waktu pasti)
Fb
Fa
Ts1
Vf
Vr
T1
T2
T3
Ts1
: 6.3(7c)
: Laston Lapis Antara Perata (AC-Base(L)) (gradasi halus/kasar)
: Ton
No.
U RAIAN
Kap. Prod./jam =
V x Fb x Fa x 60 x Bip
Ts1
= 1 : Q1
Koefisien Alat / M3
Q1
(E15)
KODE
(E01)
V
Fa
V x Fa
Q2
= 1 : Q2
(E01)
2.c.
GENERATORSET ( GENSET )
Kap.Prod. / Jam = SAMA DENGAN AMP
Koefisien Alat / ton = 1 : Q3
(E12)
Q3
(E12)
2.d.
(E08)
V
Fa
v1
v2
Q2b
Tb
Ts2
T1
T2
T3
T4
Ts2
Kap.Prod. / jam =
Q4
= 1 : Q4
ASPHALT FINISHER
Kecepatan menghampar
Faktor efisiensi alat
Lebar hamparan
Kap.Prod. / jam =
Koefisien Alat / ton
2.f.
V x Fa x 60
Ts2
= 1 : Q5
TANDEM ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
(E09)
V x b x 60 x Fa x t x D1
(E02)
V
Fa
b
Q5
(E02)
(E17)
v
b
n
N
bo
Fa
Kap. Prod./jam =
Koefisien Alat / ton
2.g.
(v x 1000) x (N(b-bo)+bo) x t x Fa x D1
n
= 1 : Q6
(E17)
(E18)
v
b
n
N
bo
Fa
: 6.3(7c)
: Laston Lapis Antara Perata (AC-Base(L)) (gradasi halus/kasar)
: Ton
No.
U RAIAN
Kap.Prod. / jam =
Koefisien Alat / ton
Q6
(v x 1000) x (N(b-bo)+bo) x t x Fa x D1
n
= 1 : Q7
2.h.
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Garpu
= 2 buah
- Tongkat Kontrol ketebalan hanparan
3.
TENAGA
Produksi menentukan : AMP
Produksi AC-BC / hari = Tk x Q5
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / ton :
- Pekerja
- Mandor
KODE
Q7
(E18)
Q2
Qt
P
M
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
(L01)
(L03)
Rp.
397,396.93
/ TON
6.
7.
Analisa EI-637c
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
2.00
0.06
7.00
1.05
1.03
1.81
1.51
KM
M
Jam
ton/m3
ton/m3
18.00
50.30
26.30
0.90
4.50
0.30
%
%
%
%
%
%As
2.32
1.42
1.42
1.57
0.05
ton / M3
ton / M3
ton / M3
ton / M3
km
0.1331
0.3719
0.1759
M3
M3
M3
1.50
M3
KETERANGAN
0.85
0.83
15.00
20.00
0.20
0.15
0.75
1.10
km/jam
km/jam
menit
menit
menit
menit
panduan
panduan
Analisa EI-637c
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
104.48
ton
0.0096
Jam
50.00
0.83
ton / Jam
-
41.50
ton
0.0241
Jam
41.50
0.0241
ton
Jam
3.50
0.80
20.00
30.00
1.00
1.00
ton
Km / Jam
Km / Jam
ton
menit
3.50
6.01
15.00
4.01
28.52
menit
menit
menit
menit
menit
5.89
ton
0.1698
Jam
5.00
0.83
3.15
109.18
m/menit
meter
ton
0.0092
Jam
1.50
1.48
6.00
Km / Jam
M
lintasan
KETERANGAN
Normal
3.00
0.30
0.83
m
-
110.91
ton
0.0090
Jam
2.50
1.99
8.00
3.00
0.30
0.83
Normal
KM / Jam
M
lintasan
M
-
Analisa EI-637c
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
193.88
ton
0.0052
Jam
KETERANGAN
Lump Sum
41.50
290.50
ton
ton
10.00
1.00
orang
orang
0.2410
0.0241
Jam
Jam
No.
I.
1
2
3
4
5
6
7
8
9
10
11
II.
1
2
3
4
5
6
: 6.4 (1)
: Lasbutag
: M2
U RAIAN
ASUMSI
Menggunakan cara mekanik
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Pek. ini tdk. termasuk Bitumen Asbuton & Peremaja
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor pemadatan material
Tebal LASBUTAG
Lasbutag terdiri dari (spesifikasi) :
- Agregat Kasar
- Pasir
- Asbuton
- Peremaja, terdiri atas :
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
- Bahan Anti Stripping (jarang digunakan)
Penyiapan campuran dilaksanakan di Base Camp
Berat Isi bahan :
- Agregat Kasar
- Pasir
- Asbuton
- Modifier
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
- Lasbutag
URUTAN KERJA
KODE
KOEF.
SATUAN
L
Tk
Fp
t
2.00
7.00
1.15
3.00
Km
Jam
Cm
CA
Ps
Asb
Md
Bo
Asp
Mt
As
30.00
49.50
16.00
4.50
47.00
38.00
15.00
0.00
%
%
%
%
%
%
%
%
D1
D2
D3
D4
D5
D6
D7
D8
1.80
1.80
1.05
0.99
0.97
1.03
0.80
2.20
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
III.
1.
BAHAN
1.a
1.b
1.c
1.d
Agregat Kasar
= (CA x (D8 x tM3) x 1.025) : D1
Pasir
= (Ps x (D8 x tM3) x 1.025) : D2
Asbuton (dibayar terpisah)
Peremaja (dibayar terpisah)
(M03)
(M01)
0.0113
0.0186
M3
M3
Berlanjut ke hal. be
No.
2
2.a.
: 6.4 (1)
: Lasbutag
: M2
U RAIAN
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
Koefisien Alat / M2
V x Fb x Fa x 60 x 100
Fp x Ts1 x t
= 1 : Q1
KOEF.
SATUAN
Koefisien Alat / M2
V x Fa x 60 x 100
D8 x Ts2 x t
= 1 : Q2
(E15)
V
Fb
Fa
Ts1
1.50
0.90
0.83
0.45
M3
menit
Ts1
0.45
menit
Q1
4,330.43
M2
0.0002
Jam
3.50
0.80
20.00
30.00
Ton
KM / Jam
KM / Jam
0.73
6.01
15.00
4.01
25.75
menit
menit
menit
menit
menit
Q2
98.84
M2
(E08)
0.0101
Jam
(E18)
v
b
n
N
bo
Fa
2.50
1.99
6.00
3.00
0.30
0.83
(E15)
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus
- Waktu muat = ( V : D8 ) : ( Q1 x t/100 ) x 60
- Waktu tempuh isi = (L : v1) x 60 menit
- Tuang ke penghampar dan lain-lain
- Waktu tempuh kosong = (L : v2) x 60 menit
Kap. Prod./jam =
2.c.
KODE
ALAT
2.b.
(v x 1000) x (N(b-bo)+bo) x Fa
n
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Q3
1,857.13
Km/Jam
M
lintasan
M
M2
Koefisien Alat / M2
2.d.
= 1 : Q3
TANDEM ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod./jam =
Koefisien Alat / M2
2.e.
(v x 1000) x b x Fa
n
= 1 : Q4
ASPHALT FINISHER
Kecepatan menghampar
Faktor efisiensi alat
Lebar hamparan
Kap.Prod. / jam =
Koefisien Alat / M2
V x b x 60 x Fa
= 1 : Q5
(E18)
0.00054
(E17)
v
b
n
Fa
3.50
1.68
4.00
0.83
Q4
Jam
Km / Jam
M
lintasan
-
1,220.10
M2
(E17)
0.0008
Jam
(E02)
V
Fa
b
Q5
20.00
0.85
3.15
3,213.00
(E02)
0.0003
m/menit
meter
M2
Jam
Berlanjut ke hal. be
No.
2.f.
: 6.4 (1)
: Lasbutag
: M2
U RAIAN
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Menunggu, dll.
2.d.
3.
ALAT BANTU
diperlukan :
- Kereta dorong
- Sekop
- Sapu lidi
KODE
(E06)
V
Fa
Ts3
T1
T2
T3
T4
Ts1
Koefisien Alat / M2
V x Fa x 60 x 100
1000 x Ts1 x t
= 1 : Q6
KOEF.
250.00
0.85
0.50
1.00
0.30
0.20
2.00
SATUAN
liter
menit
menit
menit
menit
menit
Q6
212.50
M2
(E06)
0.0047
jam
3,213.00
22,491.00
M2
M2
= 2 buah
= 3 buah
= 5 buah
TENAGA
Produksi menentukan : ASPHALT FINISHER
Produksi / hari = Tk x Q5
Kebutuhan tenaga :
- Pekerja
Q5
Qt
P
20.00
orang
- Mandor
1.00
orang
Koefisien Tenaga / M2 :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
7.
No.
I.
1
2
3
4
5
6
7
8
9
0.0062
0.0003
Jam
Jam
8,560.86 / M2.
6.
(L01)
(L02)
: 6.4 (2)
: Latasbusir Kelas A
: M2
U RAIAN
ASUMSI
Menggunakan cara mekanik
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Dalam pek. ini tdk. termasuk Asbuton & Peremaja
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor pemadatan material
Tebal Latasbusir
Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar (umumnya tidak digunakan)
- Pasir
- Asbuton
- Peremaja, terdiri atas :
- Bunker Oil (BO)
KODE
KOEF.
SATUAN
L
Tk
Fp
t
2.00
7.00
1.15
1.50
Km
Jam
Cm
CA
Ps
Asb
Md
Bo
0.00
73.00
21.00
6.00
44.00
%
%
%
%
%
10
11
- Aspal Semen
- Minyak Tanah
- Bahan Anti Stripping
Penyiapan campuran dilaksanakan di Base Camp
Berat Isi bahan :
- Agregat Kasar
- Pasir
- Asbuton
- Modifier
- Bunker Oil (BO)
Asp
Mt
As
38.00
18.00
0.00
%
%
%
D1
D2
D3
D4
D5
1.80
1.80
1.05
0.99
0.97
T/m3
T/m3
T/m3
T/m3
T/m3
- Aspal Semen
- Minyak Tanah
- Latasbusir
II.
D6
D7
D8
1.03
0.80
2.20
T/m3
T/m3
T/m3
URUTAN KERJA
1
2
3
4
5
6
III.
1.
BAHAN
1.a
1.b
1.c
1.d
Agregat Kasar
= (CA x (D8 x tM3) x 1.025) : D1
Pasir
= (Ps x (D8 x tM3) x 1.025) : D2
Asbuton (dibayar terpisah)
Peremaja (dibayar terpisah)
2
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
(M03)
(M01)
0.0000
0.0137
M3
M3
(E15)
V
Fb
Fa
Ts1
1.50
0.90
0.85
0.45
M3
menit
Ts1
0.45
menit
Berlanjut ke hal. be
No.
U RAIAN
Koefisien Alat / M2
2.b.
: 6.4 (2)
: Latasbusir Kelas A
: M2
V x Fb x Fa x 60 x 100
Fp x Ts1 x t
KODE
Q1
KOEF.
SATUAN
8,869.57
M2
= 1 : Q1
(E15)
0.0001
Jam
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus
(E08)
V
Fa
v1
v2
Ts2
3.50
0.80
20.00
30.00
Ton
KM / Jam
KM / Jam
T1
T2
T3
0.94
6.01
4.01
menit
menit
menit
T4
Ts2
15.00
25.95
menit
menit
Kap. Prod./jam =
Q2
196.15
M2
(E08)
0.0051
Jam
(E18)
v
b
n
N
bo
Fa
2.50
1.99
6.00
3.00
0.30
0.83
Koefisien Alat / M2
2.c.
V x Fa x 60 x 100
D8 x Ts2 x t
= 1 : Q2
Koefisien Alat / M2
2.d.
(v x 1000) x (N(b-bo)+bo) x Fa
n
= 1 : Q3
TANDEM ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod./jam =
Koefisien Alat / M2
2.e.
= 1 : Q4
ASPHALT FINISHER
Kecepatan menghampar
Faktor efisiensi alat
Lebar hamparan
Kap.Prod. / jam =
Koefisien Alat / M2
2.f.
(v x 1000) x b x Fa
n
V x b x 60 x Fa
= 1 : Q5
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Menunggu, dll.
Km/Jam
M
lintasan
M
Q3
1,857.13
M2
(E18)
0.00054
Jam
(E17)
v
b
n
Fa
3.50
1.68
4.00
0.83
Q4
Km / Jam
M
lintasan
-
1,220.10
M2
(E17)
0.0008
Jam
(E02)
V
Fa
b
Q5
20.00
0.83
3.15
3,137.40
(E02)
0.0003
Jam
250.00
0.83
liter
-
(E06)
V
Fa
Ts3
T1
T2
T3
T4
Ts1
0.50
1.00
0.30
0.20
2.00
m/menit
meter
M2
menit
menit
menit
menit
menit
Berlanjut ke hal. be
No.
: 6.4 (2)
: Latasbusir Kelas A
: M2
U RAIAN
KODE
KOEF.
SATUAN
Koefisien Alat / M2
V x Fa x 60 x 100
1000 x Ts1 x t
= 1 : Q6
2.d.
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Sapu lidi
= 2 buah
3.
TENAGA
Produksi menentukan : Asphal Finisher
Produksi / hari = Tk x Q5
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M2 :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
Q6
415.00
M2
(E06)
0.0024
jam
Q5
Qt
3,137.40
21,961.80
M2
M2
P
M
20.00
1.00
orang
orang
(L01)
(L02)
0.0064
0.0003
Jam
Jam
: 6.4 (2)
: Latasbusir Kelas A
: M2
No.
U RAIAN
4.
5.
2,951.52 / M2.
6.
7.
460.0000
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
7
: 6.4 (3)
: Latasbusir Kelas B
: M2
U RAIAN
ASUMSI
Menggunakan cara mekanik
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Dalam pek. ini tdk. termasuk Asbuton & Peremaja
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor pemadatan material
KODE
L
Tk
Fp
KOEF.
2.00
7.00
1.15
SATUAN
Km
Jam
-
8
9
Tebal Latasbusir
Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar
2.00
Cm
CA
14.00
10
11
II.
1
2
3
4
5
6
- Pasir
- Asbuton
- Peremaja, terdiri atas :
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
- Bahan Anti Stripping
Penyiapan campuran dilaksanakan di Base Camp
Berat Isi bahan :
- Agregat Kasar
- Pasir
- Asbuton
- Modifier
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
- Latasbusir
URUTAN KERJA
Ps
Asb
Md
Bo
Asp
Mt
As
63.00
18.00
5.00
44.00
38.00
18.00
0.00
%
%
%
%
%
%
%
D1
D2
D3
D4
D5
D6
D7
D8
1.80
1.80
1.05
0.99
0.97
1.03
0.80
2.20
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
III.
1.
BAHAN
1.a
1.b
1.c
1.d
Agregat Kasar
= (CA x (D8 x tM3) x 1.025) : D1
Pasir
= (Ps x (D8 x tM3) x 1.025) : D2
Asbuton (dibayar terpisah)
Peremaja (dibayar terpisah)
2
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
(M03)
(M01)
0.0035
0.0158
M3
M3
(E15)
V
Fb
Fa
Ts1
1.50
0.90
0.83
0.45
M3
menit
Ts1
0.45
menit
Berlanjut ke hal. be
No.
: 6.4 (3)
: Latasbusir Kelas B
: M2
U RAIAN
KODE
KOEF.
SATUAN
V x Fb x Fa x 60 x 100
Q1
6,495.65
M2
Fp x Ts1 x t
Koefisien Alat / M2
2.b.
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus
- Waktu muat = ( V : D8 ) : ( Q1 x t/100 ) x 60
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- Tuang ke penghampar dan lain-lain
Kap. Prod./jam =
Koefisien Alat / M2
2.c.
V x Fa x 60 x 100
D8 x Ts2 x t
= 1 : Q2
Koefisien Alat / M2
2.d.
(v x 1000) x (N(b-bo)+bo) x Fa
n
= 1 : Q3
TANDEM ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod./jam =
Koefisien Alat / M2
2.e.
(v x 1000) x b x Fa
n
= 1 : Q4
ASPHALT FINISHER
Kecepatan menghampar
Faktor efisiensi alat
Lebar hamparan
Kap.Prod. / jam =
Koefisien Alat / M2
2.f.
(E15)
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
= 1 : Q5
V x b x 60 x Fa
0.0002
Jam
3.50
0.80
20.00
30.00
Ton
KM / Jam
KM / Jam
1.28
6.01
4.01
15.00
26.30
menit
menit
menit
menit
menit
Q2
145.20
M2
(E08)
0.0069
Jam
(E18)
v
b
n
N
bo
Fa
2.50
1.99
6.00
3.00
0.30
0.83
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Km/Jam
M
lintasan
M
Q3
1,857.13
M2
(E18)
0.00054
Jam
(E17)
v
b
n
Fa
3.50
1.68
4.00
0.83
Q4
Km / Jam
M
lintasan
-
1,220.10
M2
(E17)
0.0008
Jam
(E02)
V
Fa
b
Q5
20.00
0.83
3.15
3,137.40
(E02)
0.0003
Jam
250.00
0.83
liter
-
(E06)
V
Fa
Ts3
T1
T2
T3
0.50
1.00
0.30
m/menit
meter
M2
menit
menit
menit
- Menunggu, dll.
T4
Ts1
0.20
2.00
menit
menit
Berlanjut ke hal. be
: 6.4 (3)
: Latasbusir Kelas B
: M2
No.
U RAIAN
Koefisien Alat / M2
KODE
V x Fa x 60 x 100
1000 x Ts1 x t
= 1 : Q6
2.d.
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Sapu lidi
= 2 buah
3.
TENAGA
Produksi menentukan : Asphalt Finisher
Produksi / hari = Tk x Q5
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M2 :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
4,803.98 / M2.
6.
7.
KOEF.
SATUAN
Q6
311.25
M2
(E06)
0.0032
jam
Q5
Qt
3,137.40
21,961.80
M2
M2
P
M
20.00
1.00
orang
orang
(L01)
(L02)
0.0064
0.0003
Jam
Jam
No.
I.
: 6.4 (4)
: Bitumen Asbuton
: Ton
U RAIAN
KODE
KOEF.
SATUAN
ASUMSI
1
2
3
4
5
6
II.
L
Tk
Ba
Ma
2.00
7.00
20.00
80.00
Km
Jam
%
%
(M55)
5.1250
Ton
URUTAN KERJA
Tidak ada kegiatan yang signifikan kecuali sedikit
pemeliharaan tumpukan stock
III.
1.
BAHAN
1.a
Asbuton halus =
( 1 Ton : Ba ) x 1.025
ALAT
Tidak diperlukan peralatan dalam mata pembayaran ini
3.
TENAGA
Tidak diperlukan tenaga kerja dalam mata pemb. ini
4.
Lihat lampiran.
5.
1,915,468.75 / M2.
6.
7.
No.
I.
1
2
3
4
5
6
II.
: 6.4 (5)
: Bitumen Bahan Peremaja
: Ton
U RAIAN
ASUMSI
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Kandungan Bitumen dalam Bunker Oil (BO)
Kandungan Bitumen dalam Aspal Semen
Kandungan Bitumen dalam Kerosene
Proporsi Peremaja (modifier Lasbutag) :
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
- Bahan Anti Stripping (umumnya tidak digunakan)
Berat Isi bahan :
- Modifier
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
Penyiapan Peremaja dilaksanakan di Base Camp
URUTAN KERJA
1
KODE
KOEF.
SATUAN
L
Tk
Bbo
Bas
Bk
2.00
7.00
80.00
100.00
0.00
Km
Jam
%
%
%
Bo
Asp
Mt
As
D1
D2
D3
D4
47.00
38.00
15.00
0.00
0.99
0.97
1.03
0.80
%
%
%
%
T/m3
T/m3
T/m3
T/m3
III.
1.
BAHAN
1 Ton Bahan Peremaja terdiri atas :
- Bunker Oil (BO)
= Bo x 1 Ton x 1000
- Aspal Semen
= Asp x 1 Ton x 1000
- Minyak Tanah
= Mt x 1 Ton x 1000
Bp1
Bp2
Bp3
470.00
380.00
150.00
Kg
Kg
Kg
Bit
756.00
Kg
(M54)
(M10)
(M11)
647.3300
507.6720
250.4960
Liter
Kg
Liter
1,000.00
0.83
liter
-
ALAT
LIQUID ASPHALT MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Pemanasan
- Mengaduk
- Menuang
- Tunggu, dll.
(E34)
V
Fa
Ts3
T1
T2
T3
T4
T5
Ts1
3.00
20.00
10.00
3.00
3.00
39.00
menit
menit
menit
menit
menit
menit
Berlanjut ke hal. be
No.
U RAIAN
Koefisien Alat/Ton
3.
: 6.4 (5)
: Bitumen Bahan Peremaja
: Ton
V x Fa x 60 x D1
1000 x Ts1
= 1 : Q1
TENAGA
Produksi menentukan : Liquid Asphalt Mixer
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
KODE
Q1
KOEF.
SATUAN
1.26
Ton
0.7910
jam
Q1
Qt
1.26
8.85
Ton
Ton
P
M
10.00
1.00
orang
orang
(E34)
= (Tk x P) / Qt
(L01)
7.9104
Jam
- Mandor
= (Tk x M) / Qt
4.
5.
10,168,069.54
/ Ton
6.
7.
(L02)
0.7910
Jam
Analisa EI-641
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
Analisa EI-641
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
lihat tabel
V - loading
Panduan
Analisa EI-641
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-642
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
lihat tabel
V - loading
Analisa EI-642
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Panduan
Analisa EI-642
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-642
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-643
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
lihat tabel
V - loading
Analisa EI-643
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Panduan
Analisa EI-643
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-644
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Analisa EI-645
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Total Modifier
Total Modifier
Total Modifier
Total Modifier
Analisa EI-645
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: Pembangunan Jembatan Ujung Kassi
0
: SUL SEL / KAB. WAJO
: 6.4 (1)
: Lasbutag
: M2
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L02)
Jam
Jam
0.0062
0.0003
BAHAN
1.
2.
Agr. Kasar
Pasir
(M03)
(M01)
M3
M3
0.0113
0.0186
PERALATAN
1.
2.
3.
4.
5.
6.
7.
Wheel Loader
Dump Truck
P. Tyre Roller
Tnd. Roller
Asp. Finisher
Conc. Mixer
Alat Bantu
(E15)
(E08)
(E18)
(E17)
(E02)
(E06)
Jam
Jam
Jam
Jam
Jam
Jam
Ls
0.0002
0.0101
0.0005
0.0008
0.0003
0.0047
1.0000
JUMLAH HARGA PERALATAN
D.
E.
F.
Note: 1
2
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah k
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: Pembangunan Jembatan Ujung Kassi
0
: SUL SEL / KAB. WAJO
: 6.4 (2)
: Latasbusir Kelas A
: M2
NO.
A.
KOMPONEN
TENAGA
PERKIRAAN
SATUAN KUANTITAS
1.
2.
Pekerja
Mandor
(L01)
(L02)
Jam
Jam
0.0064
0.0003
BAHAN
1.
Pasir
(M01)
M3
0.0137
PERALATAN
1.
2.
3.
4.
5.
6.
7.
Wheel Loader
Dump Truck
P. Tyre Roller
Tnd. Roller
Asp. Finisher
Conc. Mixer
Alat Bantu
(E15)
(E08)
(E18)
(E17)
(E02)
(E06)
Jam
Jam
Jam
Jam
Jam
Jam
Ls
0.0001
0.0051
0.0005
0.0008
0.0003
0.0024
1.0000
JUMLAH HARGA PERALATAN
D.
E.
F.
Note: 1
2
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: Pembangunan Jembatan Ujung Kassi
0
: SUL SEL / KAB. WAJO
: 6.4 (3)
: Latasbusir Kelas B
: M2
NO.
KOMPONEN
PERKIRAAN
SATUAN KUANTITAS
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L02)
Jam
Jam
0.0064
0.0003
BAHAN
1.
2.
Agr. Kasar
Pasir
(M03)
(M01)
M3
M3
0.0035
0.0158
PERALATAN
1.
2.
3.
4.
5.
6.
7.
Wheel Loader
Dump Truck
P. Tyre Roller
Tnd. Roller
Asp. Finisher
Conc. Mixer
Alat Bantu
(E15)
(E08)
(E18)
(E17)
(E02)
(E06)
Jam
Jam
Jam
Jam
Jam
Jam
Ls
0.0002
0.0069
0.0005
0.0008
0.0003
0.0032
1.0000
JUMLAH HARGA PERALATAN
D.
E.
F.
Note: 1
2
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: Pembangunan Jembatan Ujung Kassi
0
: SUL SEL / KAB. WAJO
: 6.4 (4)
: Bitumen Asbuton
: Ton
NO.
A.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
TENAGA
BAHAN
1.
Asbuton halus
(M55)
M3
5.1250
PERALATAN
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: Pembangunan Jembatan Ujung Kassi
0
: SUL SEL / KAB. WAJO
: 6.4 (5)
: Bitumen Bahan Peremaja
: Ton
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L02)
Jam
Jam
7.9104
0.7910
BAHAN
1.
2.
Bunker Oil
Aspal Semen
(M54)
(M10)
Ltr
Kg
647.3300
507.6720
4.
Minyak Tanah
(M11)
Ltr
250.4960
PERALATAN
1.
Liq.Asp.Mixer
(E34)
Jam
0.7910
3
4
Analisa EI-641
NTUK
NG HARGA SATUAN
HARGA
SATUAN
(Rp.)
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
5,950.00
7,130.00
326,724.15
120,000.00
331,200.00
101,000.00
154,800.00
136,800.00
204,917.85
27,861.00
0.00
37.04
2.22
39.26
3,683.81
2,232.45
5,916.26
76.48
1,021.86
83.35
112.12
63.78
131.11
0.00
1,488.71
7,444.23
1,116.63
8,560.86
Analisa EI-642
NTUK
NG HARGA SATUAN
HARGA
SATUAN
(Rp.)
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
5,950.00
7,130.00
37.93
2.27
40.20
120,000.00
331,200.00
101,000.00
154,800.00
136,800.00
204,917.85
27,861.00
0.00
1,646.15
1,646.15
37.34
514.92
83.35
112.12
65.31
67.13
0.00
880.19
2,566.54
384.98
2,951.52
Analisa EI-643
NTUK
NG HARGA SATUAN
:
:
:
0.00
0.00
0.00
HARGA
SATUAN
JUMLAH
HARGA
(Rp.)
5,950.00
7,130.00
326,724.15
120,000.00
331,200.00
101,000.00
154,800.00
136,800.00
204,917.85
27,861.00
0.00
(Rp.)
37.93
2.27
40.20
1,146.08
1,894.20
3,040.28
50.99
695.61
83.35
112.12
65.31
89.51
0.00
1,096.90
4,177.38
626.61
4,803.98
Analisa EI-644
NTUK
NG HARGA SATUAN
HARGA
SATUAN
(Rp.)
325,000.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
0.00
1,665,625.00
1,665,625.00
0.00
1,665,625.00
249,843.75
1,915,468.75
Analisa EI-645
NTUK
NG HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
47,067.06
5,640.14
52,707.19
3,000.00
9,500.00
1,941,989.85
4,822,883.60
8,000.00
2,003,968.25
8,768,841.71
25,600.00
20,250.70
20,250.70
8,841,799.60
1,326,269.94
10,168,069.54
a dan Peralatan, volume dan/atau ukuran
Analisa EI-733
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
0
: SUL SEL / KAB. WAJO
: 7.3 (3)
: Baja Tulangan 32 Ulir
: Kg
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
:
:
:
HARGA
SATUAN
(Rp.)
0.1050
0.0350
0.0350
5,950.00
7,760.00
7,130.00
BAHAN
1.
2.
Kg
Kg
1.1000
0.0200
13,760.00
19,070.00
PERALATAN
1.
Alat Bantu
Ls
1.0000
1,500.00
3
4
52,490.00
1,096,400,359.55
11.40
JUMLAH
HARGA
(Rp.)
624.75
271.60
249.55
1,145.90
15,136.00
381.40
15,517.40
1,500.00
1,500.00
18,163.30
2,724.50
20,887.80
Analisa EI-7610
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: Pembangunan Jembatan Ujung Kassi
0
: SUL SEL / KAB. WAJO
: 7.6 (10)
PERKIRAAN VOL. PEK.
: Pengadaan Tiang Pancang Beton Prategang PraTOTAL HARGA (Rp.)
: M'
% THD. BIAYA PROYEK
:
:
:
0.00
0.00
0.00
Bottom
NO.
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
4.0169
0.8034
0.4017
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH
HARGA
(Rp.)
23,900.36
6,234.18
2,864.03
32,998.57
B.
BAHAN
1.
M'
1.000
725,000.00
725,000.00
M'
10.500
61,875.00
649,687.50
PERALATAN
1.
2.
3.
Trailer
Crane
Alat Bantu
E29
E07
jam
jam
Ls
2.7114
0.4017
1.0000
1,374,687.50
325,800.00
480,800.00
2,000.00
3
4
883,369.44
193,131.00
2,000.00
1,078,500.44
2,486,186.51
372,927.98
2,859,114.48
No.
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
1.
: 7.7 (1)
: Penyediaan Dinding Sumuran Silinder, Diameter 250 cm
: M1
U RAIAN
KODE
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Kebutuhan baja tulangan
d
L
Tk
t
Mb
KOEF.
SATUAN
2.50
2.00
7.00
0.40
150
M
Km
Jam
M
Kg/M3
URUTAN KERJA
Caison dicetak di Lokasi
Pengecoran dengan Beton K 250 berdasarkan
analisa item pekerjaan ybs
Sekelompok pekerja akan mengerjakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Kebutuhan bahan untuk 1 M' Caison
- Beton K-250
= { Phi {(d/2)^2 - {(d-t)/2}^2)}
- Baja Tulangan
= (M37 x Mb)
- Kayu Bekisting = (2 x phi x (d/2) x 1 x 0.025 x 2 x 1.5)
- Paku
2.
ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
2 buah
- Alat-alat kecil lain
3.
TENAGA
Produksi Caison / hari
Kebutuhan tenaga tambahan :
- Pekerja
- Tukang
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Tukang
- Mandor
= (Tk x P) : Qt
= (Tk x T) : Qt
= (Tk x M) : Qt
4.
5.
(M37)
(M39)
(M19)
(M18)
1.45
216.77
0.5890
2.00
M3
Kg
M3
Kg
Qt
6.00
M'
P
T
M
9.00
3.00
1.00
orang
orang
orang
(L01)
(L02)
(L03)
10.500
3.500
1.167
jam
jam
jam
6,933,709
/ M'
6.
7.
No.
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
1.
: 7.7 (2)
: Penyediaan Dinding Sumuran Silinder, Diameter 300 cm
: M1
U RAIAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Kebutuhan baja tulangan
KODE
d
L
Tk
t
Mb
KOEF.
SATUAN
3.00
2.00
7.00
0.40
150
M
Km
Jam
M
Kg/M3
URUTAN KERJA
Caison dicetak di Lokasi
Pengecoran dengan Beton K 250 berdasarkan
analisa item pekerjaan ybs
Sekelompok pekerja akan mengerjakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Kebutuhan bahan untuk 1 M' Caison
- Beton K-250
= { Phi {(d/2)^2 - {(d-t)/2}^2)}
- Baja Tulangan
= (M37 x Mb)
- Kayu Bekisting = (2 x phi x (d/2) x 1 x 0.025 x 2 x 1.5)
- Paku
2.
ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
2 buah
- Alat-alat kecil lain
3.
TENAGA
Produksi Caison / hari
Kebutuhan tenaga tambahan :
- Pekerja
- Tukang
- Mandor
(M37)
(M39)
(M19)
(M18)
1.76
263.89
0.7069
2.00
M3
Kg
M3
Kg
Qt
6.00
M'
P
T
M
9.00
3.00
1.00
orang
orang
orang
= (Tk x P) : Qt
= (Tk x T) : Qt
= (Tk x M) : Qt
4.
5.
8,376,991
7.
No.
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
1.
10.500
3.500
1.167
jam
jam
jam
/ M'
6.
(L01)
(L02)
(L03)
: 7.7 (3)
: Penyediaan Dinding Sumuran Silinder, Diameter 350 cm
: M1
U RAIAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Kebutuhan baja tulangan
KODE
d
L
Tk
t
Mb
KOEF.
SATUAN
3.50
2.00
7.00
0.40
150
M
Km
Jam
M
Kg/M3
URUTAN KERJA
Caison dicetak di Lokasi
Pengecoran dengan Beton K 250 berdasarkan
analisa item pekerjaan ybs
Sekelompok pekerja akan mengerjakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Kebutuhan bahan untuk 1 M' Caison
- Beton K-250
= { Phi {(d/2)^2 - {(d-t)/2}^2)}
- Baja Tulangan
= (M37 x Mb)
- Kayu Bekisting = (2 x phi x (d/2) x 1 x 0.025 x 2 x 1.5)
(M37)
(M39)
(M19)
2.07
311.02
0.8247
M3
Kg
M3
- Paku
2.
ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
2 buah
- Alat-alat kecil lain
3.
TENAGA
Produksi Caison / hari
Kebutuhan tenaga tambahan :
- Pekerja
- Tukang
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Tukang
- Mandor
= (Tk x P) : Qt
= (Tk x T) : Qt
= (Tk x M) : Qt
4.
5.
9,864,393
7.
No.
I.
1
2
3
4
5
6
7
2.50
Kg
Qt
5.00
M'
P
T
M
9.00
3.00
1.00
orang
orang
orang
(L01)
(L02)
(L03)
12.600
4.200
1.400
jam
jam
jam
/ M'
6.
(M18)
: 7.7 (4)
: Penyediaan Dinding Sumuran Silinder, Diameter 400 cm
: M1
U RAIAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Kebutuhan baja tulangan
KODE
d
L
Tk
t
Mb
KOEF.
SATUAN
4.00
2.0
7.00
0.45
150
M
Km
Jam
M
Kg/M3
II.
1
2
3
III.
1.
URUTAN KERJA
Caison dicetak di Lokasi
Pengecoran dengan Beton K 250 berdasarkan
analisa item pekerjaan ybs
Sekelompok pekerja akan mengerjakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Kebutuhan bahan untuk 1 M' Caison
- Beton K-250
= { Phi {(d/2)^2 - {(d-t)/2}^2)}
- Baja Tulangan
= (M37 x Mb)
- Kayu Bekisting = (2 x phi x (d/2) x 1 x 0.025 x 2 x 1.5)
- Paku
2.
ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
2 buah
- Alat-alat kecil lain
3.
TENAGA
Produksi Caison / hari
Kebutuhan tenaga tambahan :
- Pekerja
- Tukang
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Tukang
- Mandor
= (Tk x P) : Qt
= (Tk x T) : Qt
= (Tk x M) : Qt
4.
5.
12,405,585
2.67
400.26
0.9425
3.00
M3
Kg
M3
Kg
Qt
5.00
M'
P
T
M
9.00
3.00
1.00
orang
orang
orang
(L01)
(L02)
(L03)
12.600
4.200
1.400
jam
jam
jam
/ M'
6.
7.
(M37)
(M39)
(M19)
(M18)
: 7.7 (5)
: Penurunan Dinding Sumuran Silinder, Diameter 250 cm
: M1
No.
I.
1
2
3
4
5
6
7
8
II.
1
U RAIAN
KODE
SATUAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Banyak Galian pada Caison / M'
Faktor pengembangan bahan
d
L
Tk
t
Vt
Fk
2.50
2.0
7.00
0.40
4.91
1.20
M
Km
Jam
M
M3
-
URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
Lb
2.00
Km
(E10)
V
Fb
Fa
0.93
0.90
0.83
M3
-
Ts1
T1
T2
Ts1
0.75
0.50
1.25
menit
menit
menit
menit
Q1
Q1
27.79
5.66
M3/Jam
M'/Jam
(E10)
0.1766
Jam
3.50
0.83
20.00
30.00
7.56
6.00
4.00
5.00
22.56
ton
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
6.44
1.31
M3/Jam
M'/Jam
III.
1.
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
KOEF.
V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
- Waktu tempuh kosong
- lain-lain
= 1 : Q2
= (V : Q1) x 60
= (L : v1) x 60
= (L : v2) x 60
V x Fa x 60
Fk x Ts2
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Q2
Q2
(E08)
0.7623
Jam
2.d.
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang, dan lain-lain
NAMA PAKET
JENIS PEKERJAAN
SATUAN PEMBAYARAN
: 7.7 (5)
: Penurunan Dinding Sumuran Silinder, Diameter 250 cm
: M1
No.
3.
U RAIAN
KODE
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1 x Vt
Kebutuhan tenaga untuk 20% galian :
- Pekerja
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Mandor
= (Tk x P) : (20%Qt)
= (Tk x M) : (20%Qt)
4.
5.
170,846.77 / M'
6.
7.
KOEF.
SATUAN
Q1
Qt
5.66
194.52
P
M
8.00
1.00
(L01)
(L03)
1.4394
0.1799
M'/Jam
M3
orang
orang
Jam
Jam
No.
I.
1
2
3
4
5
6
7
8
II.
1
: 7.7 (6)
: Penurunan Dinding Sumuran Silinder, Diameter 300 cm
: M1
U RAIAN
KODE
KOEF.
SATUAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Banyak Galian pada Caison / M'
Faktor pengembangan bahan
d
L
Tk
t
Vt
Fk
3.00
2.0
7.00
0.45
7.07
1.20
M
Km
Jam
M
M3
-
URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
Lb
2.00
Km
(E10)
V
Fb
0.93
0.90
M3
-
III.
1.
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Fa
0.83
Waktu siklus
- Menggali / memuat
- Lain-lain
Ts1
T1
T2
Ts1
0.75
0.50
1.25
menit
menit
menit
menit
Q1
Q1
27.79
3.93
M3/Jam
M'/Jam
(E10)
0.2544
Jam
3.50
0.83
20.00
30.00
7.56
6.00
4.00
2.00
19.56
ton
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
7.43
1.05
M3/Jam
M'/Jam
V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu muat
- Waktu tempuh isi
- Waktu tempuh kosong
- lain-lain
2.d.
3.
V x Fa x 60
Fk x Ts2
= 1 : Q2
Q2
Q2
(E08)
0.9517
Jam
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang, dan lain-lain
No.
= (V : Q1) x 60
= (L : v1) x 60
= (L : v2) x 60
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
: 7.7 (6)
: Penurunan Dinding Sumuran Silinder, Diameter 300 cm
: M1
U RAIAN
KODE
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1 x Vt
Kebutuhan tenaga untuk 20% galian :
- Pekerja
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Mandor
= (Tk x P) : (20%Qt)
= (Tk x M) : (20%Qt)
KOEF.
SATUAN
Q1
Qt
3.93
194.52
P
M
8.00
1.00
(L01)
(L03)
1.4394
0.1799
M'/Jam
M3
orang
orang
Jam
Jam
4.
5.
224,079.15 / M'
6.
7.
: 7.7 (7)
: Penurunan Dinding Sumuran Silinder, Diameter 350 cm
: M1
No.
I.
1
2
3
4
5
6
7
8
II.
1
U RAIAN
KODE
SATUAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Banyak Galian pada Caison / M'
Faktor pengembangan bahan
d
L
Tk
t
Vt
Fk
3.50
2.0
7.00
0.45
9.62
1.20
M
Km
Jam
M
M3
-
URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
Lb
2.00
Km
(E10)
V
Fb
Fa
0.93
0.90
0.83
M3
-
Ts1
T1
T2
Ts1
0.50
0.50
1.00
menit
menit
menit
menit
Q1
Q1
34.74
3.61
M3/Jam
M'/Jam
(E10)
0.2770
Jam
3.50
0.83
20.00
30.00
6.05
6.00
4.00
2.00
18.05
ton
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
8.05
0.84
M3/Jam
M'/Jam
III.
1.
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
KOEF.
V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu muat
- Waktu tempuh isi
- Waktu tempuh kosong
- lain-lain
= 1 : Q2
= (V : Q1) x 60
= (L : v1) x 60
= (L : v2) x 60
V x Fa x 60
Fk x Ts2
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Q2
Q2
(E08)
1.1953
Jam
2.d.
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang, dan lain-lain
: 7.7 (7)
: Penurunan Dinding Sumuran Silinder, Diameter 350 cm
: M1
No.
3.
U RAIAN
KODE
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1 x Vt
Kebutuhan tenaga untuk 20% galian :
- Pekerja
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Mandor
= (Tk x P) : (20%Qt)
= (Tk x M) : (20%Qt)
4.
5.
263,130.08
/ M'
6.
7.
KOEF.
SATUAN
Q1
Qt
3.61
243.15
M'/Jam
M3
P
M
12.00
1.00
orang
orang
(L01)
(L03)
1.7273
0.1439
Jam
Jam
No.
I.
1
2
3
4
5
6
7
8
II.
1
: 7.7 (8)
: Penurunan Dinding Sumuran Silinder, Diameter 400 cm
: M1
U RAIAN
KODE
KOEF.
SATUAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Banyak Galian pada Caison / M'
Faktor pengembangan bahan
d
L
Tk
t
Vt
Fk
4.00
2.0
7.00
0.45
12.57
1.20
M
Km
Jam
M
M3
-
URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
Lb
2.00
Km
(E10)
V
Fb
Fa
0.93
0.75
0.75
M3
-
III.
1.
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu muat
- Waktu tempuh isi
- Waktu tempuh kosong
- lain-lain
2.d.
3.
= 1 : Q2
menit
menit
menit
menit
Q1
Q1
26.16
2.08
M3/Jam
M'/Jam
(E10)
0.4804
Jam
3.50
0.83
20.00
30.00
8.03
6.00
4.00
3.00
21.03
ton
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
6.91
0.55
M3/Jam
M'/Jam
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Q2
Q2
(E08)
1.8193
: 7.7 (8)
: Penurunan Dinding Sumuran Silinder, Diameter 400 cm
: M1
U RAIAN
KODE
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1 x Vt
Kebutuhan tenaga untuk 20% galian :
- Pekerja
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Mandor
4.
V x Fa x 60
Fk x Ts2
0.50
0.50
1.00
Jam
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang, dan lain-lain
No.
= (V : Q1) x 60
= (L : v1) x 60
= (L : v2) x 60
Ts1
T1
T2
Ts1
= (Tk x P) : (20%Qt)
= (Tk x M) : (20%Qt)
KOEF.
SATUAN
Q1
Qt
2.08
183.09
M'/Jam
M3
P
M
14.00
1.00
orang
orang
(L01)
(L03)
2.6762
0.1912
Jam
Jam
5.
424,235.27
/ M'
6.
7.
No.
: 7.16.1
: Perkerasan Jalan Beton
: M3
U RAIAN
KODE
KOEF.
SATUAN
I.
1
2
3
4
5
6
7
8
9
10
11
II.
1
2
3
III.
1.
1.a.
1.b.
1.c.
1.d.
1.e.
1.f.
1.g.
1.h.
1.i.
1.j.
1.k.
1.l.
1.m.
2.
2.a.
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Lapis perkerasan beton padat
Kadar Semen Minimum (Spesifikasi)
Ukuran Agregat Maksimum
Perbandingan Air/Semen Maksimum (Spesifikasi)
Perbandingan Camp.
: Semen
: Pasir
: Agregat Kasar
Berat Jenis Material :
- Beton
- Semen
- Pasir
- Agregat Kasar
L
Tk
t
Ks
Ag
Wcr
Sm
Ps
Kr
2.0
7.00
0.30
365
19
0.50
400.0
791.0
1,077.0
D1
D2
D3
D4
2.20
1.25
1.30
1.40
KM
jam
m
Kg/M3
mm
%
%
%
T/M3
T/M3
T/M3
T/M3
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Batching Plant
Beton di-cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
PEMAKAIAN BAHAN, ALAT DAN TENAGA
Bahan untuk 1 m2 perkerasan beton t = 30 cm
BAHAN
Semen (PC)
= Sm x 1.025
Pasir Beton
= (Ps/1000 : D3) x 1.025
Agregat Kasar
= (Kr/1000 : D4) x 1.025
Baja Tulangan Polos
Joint Sealent
Cat Anti Karat
Expansion Cap
Polytene 125 mikron
Curing Compound
Multiplex 12 mm
Kayu Acuan
Paku
Additive
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
- Muat
- Lain lain
(E15)
V
Fb
Fa
Ts1
T1
T2
Ts1
Koefisien Alat/M2
(M12)
(M01a)
(M03)
(M39a)
(M94)
(M95)
(M96)
(M97)
(M98)
(M63)
(M99)
(M18)
(M67a)
V x Fb x Fa x 60
Ts1
= 1 : Q1
Q1
410.000
0.6237
0.7885
15.8750
0.9900
0.0200
0.1700
0.4375
0.8700
0.1600
0.096
1.024
0.9139
Kg
M3
M3
Kg
Kg
Kg
M2
Kg
Ltr
Lbr
M3
Kg
Ltr
1.50
0.85
0.83
M3
-
0.55
1.00
1.55
menit
menit
menit
40.96
M3
0.0244
Jam
No.
2.b.
U RAIAN
Kap.Prod. / jam =
Koefisien Alat/M2
2.c.
: 7.16.1
: Perkerasan Jalan Beton
: M3
V x Fa x 60
1000 x Ts2
= 1 : Q2
TRUCK MIXER
Kapasitas drum
Faktor Efisiensi alat
Kecepatan rata-rata isi
Kecepatan rata-rata kosong
Waktu Siklus
- mengisi
= (V : Q2) x 60
- mengangkut
= (L : v1) x 60 menit
- Kembali
= (L : v2) x 60 menit
- menumpahkan dll
Kap.Prod. / jam =
Koefisien Alat/M2
2.d.
V x Fa x 60
Ts3
2.e.
KODE
SATUAN
600.0
0.83
liter
-
T1
T2
T3
T4
Ts2
0.50
0.50
0.25
0.25
1.50
menit
menit
menit
menit
menit
Q2
19.92
M2
0.0502
Jam
(E49)
V
Fa
v1
v2
5.00
0.83
20.00
30.00
M3
KM / Jam
KM / Jam
T1
T2
T3
T4
Ts3
15.06
6.01
4.01
2.00
27.08
menit
menit
menit
menit
menit
Q3
9.1953
M3
0.1088
Jam
19.920
M3
0.0502
jam
4.00
0.21
0.83
M3
M3
-
(E20)
Q4
= 1 : Q4
KOEF.
(E43)
V
Fa
= 1 : Q3
CONCRETE VIBRATOR
Kebutuhan alat penggetar beton disesuaikan dengan
kapasitas BATCHING PLANT
Koefisien Alat / M2
(E23)
V
Wc
Fa
Pa
pa x Fa x 60
1000 x Wc
Koefisien Alat / M3
2.f.
= 1 : Q5
b x t Fa x v x 60
Koefisien Alat / M2
3.
23.71
M3
(E23)
0.0422
jam
(E42)
b
t
v
Fa
3.00
0.30
3.00
0.83
Q6
ALAT BANTU
Diperlukan :
- Concrete Cutter
=
- Bar Bending Machine=
- Bar Cutting Machine =
- Sekop
=
- Pacul
=
- Sendok Semen
=
- Ember Cor
=
2
2
2
2
2
3
8
M3
0.0074
jam
KODE
KOEF.
SATUAN
buah
buah
buah
buah
buah
buah
buah
TENAGA
Produksi Beton dalam 1 hari
= Tk x Q2
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M3
-
M
M
M/menit
134.460
: 7.16.1
: Perkerasan Jalan Beton
: M3
U RAIAN
Kebutuhan tenaga :
Q5
= 1 : Q6
No.
2.h.
100.00 liter/menit
:
Mandor
Tukang
Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
Qt
139.44
M3
M
Tb
P
3.00
14.00
28.00
orang
orang
orang
(L03)
(L02)
(L01)
0.1506
0.7028
1.4056
jam
jam
jam
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.
Err:509
/ M2
6.
7.
No.
I.
1
2
3
4
5
6
7
8
9
10
: 7.17.1
: Wet Lean Concrete
: M2
U RAIAN
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Lapis perkerasan beton padat
Kadar Semen Minimum (Spesifikasi)
Ukuran Agregat Maksimum
Perbandingan Air/Semen Maksimum (Spesifikasi)
Perbandingan Camp.
: Semen
: Pasir
: Agregat Kasar
KODE
L
Tk
t
Ks
Ag
Wcr
Sm
Ps
Kr
KOEF.
2.0
7.00
0.10
290
19
0.50
250.0
791.0
937.0
SATUAN
KM
jam
m
Kg/M3
mm
Kg.
Kg.
Kg.
11
II.
1
2
3
III.
1.
1.a.
1.b.
1.c.
1.d.
1.e.
1.f.
2.
2.a.
D1
D2
D3
D4
Paku
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
- Muat
- Lain lain
Koefisien Alat/M2
2.b.
T/M3
T/M3
T/M3
T/M3
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Batching Plant
Beton di-cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
(M12)
(M01a)
(M03)
(M63)
(M19)
(M18)
25.625
0.0062
0.0069
0.0160
0.010
0.102
Kg
M3
M3
Lbr
M3
Kg
1.50
0.85
0.83
M3
-
0.75
0.50
1.25
menit
menit
menit
(E15)
V
Fb
Fa
Ts1
T1
T2
Ts1
No.
2.20
1.25
1.30
1.40
V x Fb x Fa x 60
Ts1
Q1
= 1 : Q1
507.96
M2
0.0020
Jam
: 7.17.1
: Wet Lean Concrete
: M2
U RAIAN
KODE
KOEF.
SATUAN
(E43)
V
Fa
600.0
0.83
liter
-
T1
0.50
menit
- mengaduk
- menuang
- menunggu dll
Kap.Prod. / jam =
Koefisien Alat/M2
2.c.
V x Fa x 60
1000 x Ts2
= 1 : Q2
TRUCK MIXER
Kapasitas drum
Faktor Efisiensi alat
Kecepatan rata-rata isi
Kecepatan rata-rata kosong
Waktu Siklus
- mengisi
= (V : Q2) x 60
- mengangkut
= (L : v1) x 60 menit
- Kembali
= (L : v2) x 60 menit
- menumpahkan dll
Kap.Prod. / jam =
Koefisien Alat/M2
2.d.
V x Fa x 60
Ts3
2.e.
No.
2.f.
Q2
19.92
M2
0.0502
Jam
(E49)
V
Fa
v1
v2
5.00
0.83
20.00
30.00
M3
KM / Jam
KM / Jam
T1
T2
T3
T4
Ts3
15.06
6.01
4.01
3.00
28.08
menit
menit
menit
menit
menit
Q3
88.6784
M2
0.0113
Jam
199.200
M2
0.0050
jam
(E20)
= 1 : Q4
menit
menit
menit
menit
Q4
Koefisien Alat / M3
0.50
0.25
0.25
1.50
= 1 : Q3
CONCRETE VIBRATOR
Kebutuhan alat penggetar beton disesuaikan dengan
kapasitas BATCHING PLANT
Koefisien Alat / M2
T2
T3
T4
Ts2
(E23)
V
Wc
Fa
Pa
pa x Fa x 60
1000 x Wc
= 1 : Q5
4.00
M3
0.19
M3
0.83
100.00 liter/menit
Q5
26.21
M3
(E23)
0.0382
jam
: 7.17.1
: Wet Lean Concrete
: M2
U RAIAN
KODE
(E42)
b
t
v
KOEF.
SATUAN
3.00
0.30
3.00
M
M
M/menit
b x t Fa x v x 60
Koefisien Alat / M2
2.h.
3.
2
2
2
2
2
3
8
Q6
1,344.600
M2
0.0007
jam
Qt
139.44
M3
M
Tb
P
2.00
2.00
12.00
orang
orang
orang
(L03)
(L02)
(L01)
0.1004
0.1004
0.6024
jam
jam
jam
buah
buah
buah
buah
buah
buah
buah
TENAGA
Produksi Beton dalam 1 hari
= Tk x Q2
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M3
-
:
Mandor
Tukang
Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
0.83
= 1 : Q6
ALAT BANTU
Diperlukan :
- Concrete Cutter
=
- Bar Bending Machine=
- Bar Cutting Machine =
- Sekop
=
- Pacul
=
- Sendok Semen
=
- Ember Cor
=
Kebutuhan tenaga :
Fa
Err:509
/ M2
6.
7.
Analisa EI-771
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 7.7 (1)
: Penyediaan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
Spec.
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
(L01)
(L02)
(L03)
Jam
Jam
Jam
10.5000
3.5000
1.1667
Tambahan
Tambahan
B.
BAHAN
1.
2.
3.
4.
Beton K-250
Baja Tulangan
Kayu Perancah
Paku
(EI-715)
(EI-73)
(M19)
(M18)
M3
Kg
M3
Kg
1.4451
216.7699
0.5890
2.0000
PERALATAN
1.
Alat Bantu
Ls
1.0000
3
4
Analisa EI-772
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 7.7 (2)
: Penyediaan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
Spec.
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
(L01)
(L02)
(L03)
Jam
Jam
Jam
10.5000
3.5000
1.1667
Tambahan
Tambahan
B.
BAHAN
1.
2.
3.
4.
Beton K-250
Baja Tulangan
Kayu Perancah
Paku
(EI-715)
(EI-73)
(M19)
(M18)
M3
Kg
M3
Kg
1.7593
263.8938
0.7069
2.0000
PERALATAN
1.
Alat Bantu
Ls
1.0000
3
4
Analisa EI-773
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 7.7 (3)
: Penyediaan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
Spec.
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
(L01)
(L02)
(L03)
Jam
Jam
Jam
12.6000
4.2000
1.4000
BAHAN
Tambahan
1.
2.
3.
4.
Beton K-250
Baja Tulangan
Kayu Perancah
Paku
(EI-715)
(EI-73)
(M19)
(M18)
M3
Kg
M3
Kg
2.0735
311.0177
0.8247
2.5000
PERALATAN
1.
Alat Bantu
Ls
1.0000
3
4
Analisa EI-774
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 7.7 (4)
: Penyediaan Dinding Sumuran Silinder,
: M1
PERKIRAAN
NO.
KOMPONEN
SATUAN KUANTITAS
Spec.
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
(L01)
(L02)
(L03)
Jam
Jam
Jam
12.6000
4.2000
1.4000
Tambahan
Tambahan
B.
BAHAN
1.
2.
3.
4.
Beton K-250
Baja Tulangan
Kayu Perancah
Paku
(EI-715)
(EI-73)
(M19)
(M18)
M3
Kg
M3
Kg
2.6684
400.2585
0.9425
3.0000
PERALATAN
1.
Alat Bantu
Ls
1.0000
3
4
Analisa EI-775
URAIAN ANALISA HARGA SATUAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 7.7 (5)
: Penurunan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
1.4394
0.1799
BAHAN
PERALATAN
1.
2
3
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
Jam
Jam
Ls
0.1766
0.7623
1.0000
3
4
Lump Sump
Analisa EI-775
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-776
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 7.7 (6)
: Penurunan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
1.4394
0.1799
BAHAN
PERALATAN
1.
2
3
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
Jam
Jam
Ls
0.2544
0.9517
1.0000
3
4
Lump Sump
Analisa EI-776
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-777
URAIAN ANALISA HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 7.7 (7)
: Penurunan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
1.7273
0.1439
BAHAN
PERALATAN
1
2
3
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
Jam
Jam
Ls
0.2770
1.1953
1.0000
3
4
Lump Sump
Analisa EI-777
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-778
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 7.7 (8)
: Penurunan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
2.6762
0.1912
BAHAN
PERALATAN
1
2
3
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
Jam
Jam
Ls
0.4804
1.8193
1.0000
3
4
Lump Sump
Analisa EI-778
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-7.16.1
KETERANGAN
PROYEK
NAMA PAKET
:
: Pembangunan Jembatan Ujung Kassi
NO.
Berdasarkan
JMF & sesuai
dgn Spesifikasi
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
1.
2.
3.
TENAGA
Pekerja
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.4056
0.7028
0.1506
BAHAN
Semen
Pasir
Agregat Kasar
Baja Tulangan Polos
Joint Sealent
Cat Anti Karat
Expansion Cap
Polytene 125 mikron
Curing Compound
C.
1
2
3
4
5
6
7
8
PERALATAN
Wheel Loader
Batching Plant
Truck Mixer
Con. Vibrator
Water Tank Truck
Conc. Paver
Alat Bantu
Multiplex 12 mm
Kayu Acuan
Paku
Additive
D.
E.
F.
G.
Note: 1
2
3
4
(M12)
(M01a)
(M03)
(M39a)
(M94)
(M95)
(M96)
(M97)
(M98)
(M73)
(M99)
(M18)
(M67a)
Kg
M3
M3
Kg
Kg
Kg
M2
Kg
Ltr
Lbr
M3
Kg
Ltr
E15
E43
E49
E20
E23
E42
jam
jam
jam
jam
jam
jam
Ls
410.0000
0.6237
0.7885
15.8750
0.9900
0.0200
0.1700
0.4375
0.8700
0.1600
0.0960
1.0240
0.9139
JUMLAH HARGA BAH
0.0244
0.0502
0.1088
0.0502
0.0422
0.0074
1.0000
Analisa EI-7.16.1
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
945
Analisa EI-7.16.1
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-7171
KETERANGAN
PROYEK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 7.17.1
105,722.16
NO.
Berdasarkan
JMF & sesuai
dgn Spesifikasi
A.
1.
2.
3.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
TENAGA
Pekerja
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.6024
0.1004
0.1004
DIA 12 4 BATANG
BAHAN
Semen
Pasir
Agregat Kasar
Multiplex 12 mm
Kayu Acuan
Paku
(M12)
(M01a)
(M03)
(M73)
(M18)
Kg
M3
M3
Lbr
M3
Kg
25.6250
0.0062
0.0069
0.0160
0.0096
0.1024
945
({(Ps x D1) : D3} x 1.05) x 0.25
KAYU ACUAN
0.002
MULTIPLEX
0.667
3.514
0.190
0.021
0.014
0.75
1.3333333333
0.665
0.0112
0.0168
4.8076923077
3.7593984962
C.
1
2
3
4
5
6
7
8
PERALATAN
Wheel Loader
Batching Plant
Truck Mixer
Con. Vibrator
Water Tank Truck
Conc. Paver
Alat Bantu
D.
E.
F.
G.
Note: 1
2
3
4
Analisa EI-7171
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
E15
E43
E49
E20
E23
E42
jam
jam
jam
jam
jam
jam
Ls
0.0020
0.0502
0.0113
0.0050
0.0382
0.0007
1.0000
Analisa EI-7171
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-771
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
:
:
:
16.00
4,378,000.00
0.05
JUMLAH
HARGA
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,419,323.61
12,760.00
1,764,140.00
37,550.00
0.00
62,475.00
27,160.00
8,318.33
97,953.33
2,051,110.85
2,765,983.84
1,039,164.24
75,100.00
5,931,358.93
0.00
0.00
AN ( A + B + C )
6,029,312.26
904,396.84
6,933,709.10
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-772
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
: Err:509
: Err:509
:
Err:509
JUMLAH
HARGA
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,419,323.61
12,760.00
1,764,140.00
37,550.00
0.00
62,475.00
27,160.00
8,318.33
97,953.33
2,497,004.52
3,367,284.67
1,246,997.08
75,100.00
7,186,386.27
0.00
0.00
AN ( A + B + C )
7,284,339.61
1,092,650.94
8,376,990.55
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-773
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
: Err:509
: Err:509
:
Err:509
JUMLAH
HARGA
(Rp.)
74,970.00
32,592.00
9,982.00
117,544.00
1,419,323.61
12,760.00
1,764,140.00
37,550.00
2,942,898.18
3,968,585.50
1,454,829.93
93,875.00
8,460,188.62
0.00
0.00
0.00
AN ( A + B + C )
8,577,732.62
1,286,659.89
9,864,392.51
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-774
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA
: Err:509
: Err:509
:
Err:509
JUMLAH
SATUAN
(Rp.)
HARGA
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,419,323.61
12,760.00
1,764,140.00
37,550.00
0.00
74,970.00
32,592.00
9,982.00
117,544.00
3,787,309.31
5,107,298.96
1,662,662.78
112,650.00
10,669,921.04
0.00
0.00
AN ( A + B + C )
10,787,465.04
1,618,119.76
12,405,584.80
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
Analisa EI-775
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
:
:
:
16.00
2,733,548.38
0.03
JUMLAH
HARGA
(Rp.)
8,564.72
1,282.91
9,847.63
0.00
349,400.00
101,000.00
0.00
61,720.47
76,994.30
0.00
138,714.78
AN ( A + B + C )
148,562.41
22,284.36
170,846.77
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-776
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
: Err:509
: Err:509
:
Err:509
JUMLAH
HARGA
(Rp.)
8,564.72
1,282.91
9,847.63
349,400.00
101,000.00
0.00
0.00
88,877.48
96,126.32
0.00
185,003.80
AN ( A + B + C )
194,851.44
29,227.72
224,079.15
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
Analisa EI-777
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
: Err:509
: Err:509
:
Err:509
JUMLAH
HARGA
(Rp.)
10,277.67
1,026.33
11,304.00
0.00
349,400.00
101,000.00
0.00
96,777.70
120,727.07
0.00
217,504.77
AN ( A + B + C )
228,808.77
34,321.32
263,130.08
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-778
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
: Err:509
: Err:509
:
Err:509
JUMLAH
HARGA
(Rp.)
15,923.54
1,362.96
17,286.50
349,400.00
101,000.00
0.00
0.00
167,863.89
183,749.85
0.00
351,613.74
AN ( A + B + C )
368,900.24
55,335.04
424,235.27
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
Analisa EI-7.16.1
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
: Err:509
: Err:509
:
Err:509
JUMLAH
HARGA
(Rp.)
8,363.45
5,453.82
1,073.80
14,891.06
1,174.00
232,900.00
326,724.15
12,760.00
34,100.00
35,750.00
6,050.00
19,250.00
38,500.00
181,500.00
1,764,140.00
37,550.00
38,500.00
JUMLAH HARGA BAHAN
481,340.00
145,253.46
257,627.83
202,565.00
33,759.00
715.00
1,028.50
8,421.88
33,495.00
29,040.00
169,357.44
38,451.20
35,185.92
1,436,240.22
331,200.00
394,600.00
149,800.00
25,900.00
178,400.00
408,100.00
15,000.00
8,085.05
19,809.24
16,290.89
1,300.20
7,522.89
3,035.10
15,000.00
AH HARGA PERALATAN
AN ( A + B + C )
71,043.37
1,522,174.66
228,326.20
1,750,500.86
1,750,500.86
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
0.025
Analisa EI-7171
NDAR UNTUK
G-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
: Err:509
: Err:509
:
Err:509
JUMLAH
HARGA
(Rp.)
3,584.34
779.12
715.86
1,174.00
232,900.00
326,724.15
181,500.00
1,764,140.00
37,550.00
331,200.00
394,600.00
149,800.00
25,900.00
178,400.00
408,100.00
0.00
5,079.32
30,083.75
1,452.53
2,241.39
2,904.00
16,935.74
3,845.12
57,462.53
652.02
19,809.24
1,689.25
130.02
6,806.43
303.51
0.00
AH HARGA PERALATAN
AN ( A + B + C )
29,390.46
91,932.31
13,789.85
105,722.16
105,722.16
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
: 7.6 (9)
: Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran / diameter ..
: M3
Ukuran (cm x cm) :
50
URAIAN ANALISA HARGA SATUAN
U RAIAN
KODE
SATUAN
ASUMSI
Menggunakan alat (cara mekanik)
Beton & tulangan sesuai analisa item pekerjaan ybs.
Tiang Pcg. dibuat di Base Camp & diangkut ke lokasi pek.
L
Tk
Lt
Uk
Mb
42.00
7.00
0.81
0.50
110.0
KM
jam
M
M
Kg/M3
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
Besi tulangan dibuat di base camp dan dibawa kelokasi
Beton di-cor ke dalam perancah yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
III.
1.
1.a.
1.b.
1.c.
1.d.
1.e.
BAHAN
Beton K 400
Baja Tulangan
= Mb
Plat Baja utk Sepatu tiang/sambungan (t=16mm)
Kayu Bekisting tambahan = {Uk x 1.0 x 4 x 0.02}
Paku
2.
2.a
ALAT
TRAILER
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (L : v1 ) x 60
- Waktu tempuh kosong = (L : v2) x 60
- Lain-Lain (tunggu, bongkar dan muat)
Koefisien Alat / m3
2.b
KOEF.
CRANE
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu muat bongkar
- dan lain-lain
= 1 : Q1
(EI-712)
(EI-732)
(M48)
(M19)
(M18)
(E29)
V
Fa
v1
v2
Ts1
T1
T2
T3
Ts1
Uk x Uk x V x Fa x 60 x Lt
Ts1
Q1
0.1600
17.60
44.1786
0.0400
0.4000
M3
Kg
Kg
M3
Kg
7.00
3.83
20.00
30.00
Km/Jam
Km/Jam
126.00
84.00
140.00
350.00
menit
menit
menit
menit
0.94
batang
M3
(E29)
1.0680
Jam
(E07)
V2
Fa
10.00
0.83
batang
-
T3
T4
Ts2
20.00
5.00
25.00
menit
menit
menit
Uk x Uk x Lt x V2 x Fa x 60
Ts2
= 1 : Q2
Q2
(E29)
4.06
0.2464
M3
Jam
ALAT BANTU
Diperlukan alat bantu kecil antara lain :
- Alat Las
- Alat kecil lainnya.
Berlanjut k
: 7.6 (9)
: Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran / diameter ..
: M3
URAIAN ANALISA HARGA SATUAN
No.
3.
U RAIAN
KODE
TENAGA
Produksi Tiang dalam 1 hari
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
(kayu & besi)
- Pekerja
Koefisien Tenaga / M3
-
:
Mandor
Tukang
Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
1,906,268.04
/ M3
6.
7.
KOEF.
SATUAN
Qt
Qt
Qt
5.00
4.07
1.02
Batang
M'
M3
M
Tb
P
1.00
2.00
4.00
orang
orang
orang
(L03)
(L02)
(L01)
1.4000
2.8000
5.6000
jam
jam
jam
Analisa EI-769
SA HARGA SATUAN
KETERANGAN
Lumpsum
Analisa EI-769
SA HARGA SATUAN
Lanjutan
KETERANGAN
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
: 7.6 (9)
: Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran / diameter ..
: M3
Ukuran (cm x cm) :
50
URAIAN ANALISA HARGA SATUAN
U RAIAN
KODE
SATUAN
ASUMSI
Menggunakan alat (cara mekanik)
Beton & tulangan sesuai analisa item pekerjaan ybs.
Tiang Pcg. dibuat di Base Camp & diangkut ke lokasi pek.
L
Tk
Lt
Uk
Mb
44.00
7.00
0.81
0.50
110.0
KM
jam
M
M
Kg/M3
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
Besi tulangan dibuat di base camp dan dibawa kelokasi
Beton di-cor ke dalam perancah yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
III.
1.
1.a.
1.b.
1.c.
1.d.
1.e.
BAHAN
Beton K 400
Baja Tulangan
= Mb
Plat Baja utk Sepatu tiang/sambungan (t=16mm)
Kayu Bekisting tambahan = {Uk x 1.0 x 4 x 0.02}
Paku
2.
2.a
ALAT
TRAILER
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (L : v1 ) x 60
- Waktu tempuh kosong = (L : v2) x 60
- Lain-Lain (tunggu, bongkar dan muat)
Koefisien Alat / m3
2.b
KOEF.
CRANE
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu muat bongkar
- dan lain-lain
= 1 : Q1
(EI-712)
(EI-732)
(M48)
(M19)
(M18)
(E29)
V
Fa
v1
v2
Ts1
T1
T2
T3
Ts1
Uk x Uk x V x Fa x 60 x Lt
Ts1
Q1
0.1600
17.6
44.1786
0.0400
0.4000
M3
Kg
Kg
M3
Kg
7.00
3.83
20.00
30.00
Km/Jam
Km/Jam
132.01
88.01
140.00
360.02
menit
menit
menit
menit
0.91
batang
M3
(E29)
1.0986
Jam
(E07)
V2
Fa
10.00
0.83
batang
-
T3
T4
Ts2
20.00
5.00
25.00
menit
menit
menit
Uk x Uk x Lt x V2 x Fa x 60
Ts2
= 1 : Q2
Q2
(E29)
4.06
0.2464
M3
Jam
ALAT BANTU
Diperlukan alat bantu kecil antara lain :
- Alat Las
- Alat kecil lainnya.
Berlanjut k
: 7.6 (9)
: Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran / diameter ..
: M3
URAIAN ANALISA HARGA SATUAN
No.
3.
U RAIAN
KODE
TENAGA
Produksi Tiang dalam 1 hari
Kebutuhan tenaga tambahan di lokasi :
- Mandor
- Tukang
(kayu & besi)
- Pekerja
Koefisien Tenaga / M3
-
:
Mandor
Tukang
Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
1,917,722.76
/ M3
6.
7.
KOEF.
SATUAN
Qt
Qt
Qt
5.00
4.07
1.02
Batang
M'
M3
M
Tb
P
1.00
2.00
4.00
orang
orang
orang
(L03)
(L02)
(L01)
1.4000
2.8000
5.6000
jam
jam
jam
Analisa EI-769
SA HARGA SATUAN
KETERANGAN
Lumpsum
Analisa EI-769
SA HARGA SATUAN
Lanjutan
KETERANGAN
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
: 8.1 (1)
: Pondasi Agregat Kls. A Untuk Pek. Minor
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : setempat2 di sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis agregat padat
Berat isi padat
Jam kerja efektif per-hari
Proporsi Campuran :
- Agregat Pecah Mesin 20 - 30 mm
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Pasir Urug
Berat Isi Agregat (lepas)
Faktor kehilangan
- Agregat A
1.
BAHAN
- Agregat A
= 1 M3 x (Bip/Bil) x Fh
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Memuat dan lain-lain
5-10&10-20
PU
Bil
Fh
Koefisien Alat / M3
(M26)
(E15)
V
Fb
Fa
Ts1
2.b.
L
t
Bip
Tk
20-30
URUTAN KERJA
Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar secara manual
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
III.
2.
2.a.
KODE
V x Fb x Fa x 60
Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus : - Waktu memuat =
V x 60/Q1 x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
Q1
(E15)
(E08)
V
Fa
v1
v2
T1
T2
T3
T4
Ts2
Q2
Koefisien Alat / M3
V x Fa x 60
Ts2 x Bip
= 1 : Q2
: 8.1 (1)
: Pondasi Agregat Kls. A Untuk Pek. Minor
: M3
No.
2.c.
U RAIAN
Koefisien Alat / M3
(E24)
v
b
n
Fa
(v x 1000) x b x t x Fa
n
= 1 : Q3
(E23)
V
Wc
pa
Fa
pa x Fa x 60
1000 x Wc
Koefisien Alat / M3
= 1 : Q4
ALAT BANTU
Diperlukan :
- Kereta dorong
- Sekop
- Garpu
= 5 buah
= 10 buah
= 10 buah
Q4
(E23)
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
3.
Q3
(E24)
2.g.
KODE
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod. / jam =
2.d.
(E09)
Q1
Qt
P
M
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
(L01)
(L03)
4.
5.
6.
499,055.60 / M3.
7.
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
bulan
0.00 M3
: 8.1 (2)
: Pondasi Agregat Kls. B Untuk Pek. Minor
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : setempat2 di sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis agregat padat
Berat isi padat
Jam kerja efektif per-hari
Proporsi Campuran :
- Agregat Pecah Mesin 20 - 30 mm
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Sirtu
Berat volume agregat (lepas)
- Agregat B
URUTAN KERJA
Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan pekerja
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparan dan level permukaan
KODE
L
t
Bip
Tk
20-30
5-10&10-20
St
Bil
Fh
(M27)
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Memuat dan lain-lain
(E15)
V
Fb
Fa
Ts1
T1
Ts1
V x Fb x Fa x 60
Ts1
= 1 : Q1
Koefisien Alat / M3
V x Fa x 60
Bip x Ts2
= 1 : Q2
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
KODE
(E24)
v
b
n
Fa
2.d.
Q2
(E09)
U RAIAN
Koefisien Alat / M3
(E08)
V
Fa
v1
v2
T1
T2
T3
T4
Ts2
: 8.1 (2)
: Pondasi Agregat Kls. B Untuk Pek. Minor
: M3
No.
2.c.
(E15)
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus : - Waktu memuat =
V x 60/Q1 x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- Lain-lain (termasuk dumping setempat-setempat)
Q1
(v x 1000) x b x t x Fa
n
= 1 : Q3
Q3
(E24)
(E23)
V
Wc
pa
Fa
pa x Fa x 60
Q4
Wc x 1000
2.e.
3.
Koefisien Alat / M3
= 1 : Q4
ALAT BANTU
Diperlukan :
- Kereta dorong
- Sekop
- Garpu
= 5 buah
= 10 buah
= 10 buah
(E23)
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Q1
Qt
P
M
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
6.
498,570.66 / M3.
7.
(L01)
(L03)
bulan
0.00 M3
: 8.1 (3)
: Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup Aspal Utk. Pek. Minor
SATUAN PEMBAYARAN
: M3
No.
I.
1
2
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
KODE
3
4
5
6
7
8
II.
1
2
3
4
III.
1.
2.
2.a.
L
t
Bip
Tk
Bil
URUTAN KERJA
Wheel Loader memuat Agregat ke dalam Dump
Tuck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaandan dihampar dengan pekerja
Hamparaan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Pedestrian Roller.
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Material Agregat Kelas C hasil produksi di Base Camp
Setiap 1 M3 Agregat padat diperlukan : 1 x Fk
(M28)
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu siklus
- Muat
(E15)
V
Fb
Fa
Ts1
T1
Ts1
V x Fb x Fa x 60
Bip/Bil x Ts1
= 1 : Q1
(E15)
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus : - Waktu memuat =
V x 60/Q1 x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- Lain-lain (termasuk dumping setempat-setempat)
Kap. Prod./jam =
Koefisien Alat / M3
V x Fa x 60
Bip/Bil x Ts2
= 1 : Q2
Q1
(E09)
V
Fa
v1
v2
T1
T2
T3
T4
Ts2
Q2
(E09)
: 8.1 (3)
: Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup Aspal Utk. Pek. Minor
SATUAN PEMBAYARAN
: M3
No.
2.c.
U RAIAN
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
(E24)
v
b
n
Fa
(v x 1000) x b x t x Fa
n
Koefisien Alat / M3
2.d.
= 1 : Q3
3.
(E23)
V
Wc
pa
Fa
pa x Fa x 60
Wc x 1000
Koefisien Alat / M3
= 1 : Q4
ALAT BANTU
diperlukan :
- Kereta dorong
- Sekop
- Garpu
= 5 buah
= 10 buah
= 10 buah
Q4
(E23)
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi Agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3
Q1
Qt
P
M
:
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
Q3
(E24)
2.g.
KODE
422,476.55 / M3.
(L01)
(L03)
6.
7.
No.
I.
1
2
3
4
5
6
7
8
9
10
II.
1
2
3
bulan
0.00 M3
: 8.1 (4)
: Waterbound Macadam Utk. Pek. Minor
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan material Agregat
Komposisi campuran (taksiran) :
- Agregat Kasar
- Agregat Halus
Berat jenis bahan :
- Agregat
Berat isi padat
Berat volume agregat (lepas)
KODE
L
Tk
Fh
Ak
Ah
D1
Bip
Bil
URUTAN KERJA
Permukaan dasar dibersihkan dan diratakan
Agregat dimuat ke dalam Dump Truck dengan
menggunakan Wheel Loader (di Base Camp)
Agregat Kasar ditebarkan (manual) sesuai tebal yang
diperlukan dan dipadatkan dengan Three Wheel
Roller (6-8 Ton) minimum 6 lintasan
Agregat Halus ditebarkan dan dipadatkan dengan
disiram air agar mengisi rongga Agregat Kasar
III.
1.
1.a.
1.b.
(M03)
(M04)
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
(E15)
V
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
- Menunggu, dan lain lain
Fb
Fa
Ts1
T1
Ts1
Koefisien Alat/M3
2.b.
V x Fb x Fa x 60
Ts1 x (Bip/Bil)
= 1 : Q1
(E09)
V
Fa
v1
v2
Waktu Siklus
- Mengisi Bak = V : Q1 x 60
- Angkut
= (L : v1) x 60 menit
- Tunggu + dump + Putar
- Kembali
= (L : v2) x 60 menit
Ts2
T1
T2
T3
T4
Ts2
Kap.Prod. / jam =
Q2
V x Fa x 60
Ts2
= 1 : Q2
(E09)
: 8.1 (4)
: Waterbound Macadam Utk. Pek. Minor
: M3
No.
U RAIAN
KODE
(E16)
v
b
t
n
N
bo
Fa
Apabila N > 1
Kap. Prod. / jam =
2.d.
(E15)
Koefisien Alat / M3
2.c.
Q1
(v x 1000) x b x t x Fa
n
Q3
(v x 1000) x (N(b-bo)+bo) x t x Fa x D1
n
Q3
Koefisien Alat / M3
= 1 : Q3
ALAT BANTU
diperlukan :
- Kereta dorong
- Sekop
- Sapu
- Sikat
=
=
=
=
3
5
5
3
buah
buah
buah
buah
(E16)
3.
TENAGA
Produksi menentukan (Produksi Wheel Loader)
Produksi Lapen / hari = Q1 x Tk
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M3
Q1
Qt
P
M
:
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
6.
437,317.45 / M3.
7.
No.
I.
1
2
3
4
(L01)
(L03)
bulan
0.00 M3
: 8.1 (5)
: Camp. Aspal Panas Utk.Pek.Minor
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
KODE
5
6
7
- Agregat
t
Tk
Fh1
- Aspal
8
10
11
II.
1
2
3
4
Fh2
CA
FA
FF
As
D1
D2
D3
D4
l
Fk
URUTAN KERJA
Wheel Loader memuat Agregat ke dalam
Cold Bin AMP
Agregat dan aspal dicampur dan dipanaskan
dengan AMP untuk dimuat langsung kedalam
Dump Truck dan diangkut ke lokasi pekerjaan
Campuran panas ATB dihampar dengan manual
dan dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparaan dengan menggunakan
Alat Bantu
III.
1.
1.a.
1.b.
1.c.
1.d.
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Kecepatan maju (ke bin)
Kecepatan kembali (ke stock pile)
Waktu Siklus
- Muat =
- Lain lain
Koefisien Alat/M3
l x 60
1000 x Vf
+ l x 60
1000 x Vr
V x Fb x Fa x 60
Fh1 x Ts1xFk
= 1 : Q1
: 8.1 (5)
: Camp. Aspal Panas Utk.Pek.Minor
(M03)
(M04)
(M05)
(M10)
(E15)
V
Fb
Fa
Vf
Vr
Ts1
T1
T2
Ts1
Q1
(E15)
SATUAN PEMBAYARAN
: M3
No.
2.b.
U RAIAN
KODE
(E01)
V
Fa
V x Fa
D1 x Fk
= 1 : Q2
Q2
(E01)
2.c.
GENERATORSET ( GENSET )
Kap.Prod. / Jam = SAMA DENGAN AMP
Koefisien Alat/M3
= 1 : Q3
(E12)
Q3
(E12)
2.d.
(E09)
V
Fa
v1
v2
Q2b
Tb
Ts2
T1
T2
T3
T4
Ts2
Kap.Prod. / jam =
Koefisien Alat/M3
2.e.
V x Fa x 60
D1 x Ts2 x Fk
= 1 : Q4
(E17)
v
b
n
Fa
2.h.
3.
(E09)
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Koefisien Alat/M3
Q4
(v x 1000) x b x t x Fa
n
= 1 : Q5
Q5
(E17)
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop, Garpu = 5 buah
- Pacul, Linggis = 4 buah
- Tongkat Kontrol ketebalan hanparan
TENAGA
Produksi menentukan : AMP
Produksi ATB / hari = Tk x Q6
Kebutuhan tenaga :
- Pekerja
Q6
Qt
P
- Mandor
Koefisien Tenaga / M3
4.
= (Tk x P) / Qt
= (Tk x M) / Qt
: 8.1 (5)
: Camp. Aspal Panas Utk.Pek.Minor
: M3
No.
U RAIAN
7.
KODE
6.
(L01)
(L03)
5.
:
- Pekerja
- Mandor
22,439.13 / M3.
bulan
0.00 M3
No.
I.
1
2
3
4
5
6
7
8
10
II.
1
2
3
: 8.1 (7)
: Penetrasi Macadam Utk.Pek.Minor
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal rata2 Lapen
Jam kerja efektif per-hari
Faktor kehilanganmaterial :
Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok
- Agregat Pengunci
- Aspal
:
- Paska Agregat Pokok
KODE
- Agregat
- Aspal
L
t
Tk
Fh1
Fh2
Ak
Ap
As1
As2
D1
D2
Fk
URUTAN KERJA
Permukaan dasar dibersihkan dan disemprot aspal cair
bilamana diperlukan
Agregat kasar dimuat ke dalam Dump Truck
menggunakan Wheel Loader (di Base Camp)
Agregat Kasar ditebarkan (manual) sesuai tebal yang
diperlukan dan dipadatkan dengan Three Wheel
Roller (6-8 Ton) minimum 6 lintasan
Aspal disemprotkan di atas agregat kasar yang telah
III.
1.
1.a.
1.b.
1.c.
BAHAN
Agregat Kasar
Agregat Pengunci
Aspal
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
- Memuat, menuang, kembali
(M03)
(M04)
(M10)
(E15)
V
Fb
Fa
Ts1
T1
Ts1
Koefisien Alat/M3
2.b.
V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1
(E09)
V
Fa
v1
v2
: 8.1 (7)
: Penetrasi Macadam Utk.Pek.Minor
: M3
No.
2.c.
(E15)
Q1
U RAIAN
KODE
Waktu Siklus
- Mengisi Bak =
(V x 60)/(Q1 x D1 x Fk)
- Angkut
= (L : v1) x 60 menit
- Tunggu + dump (setempat2) + Putar
- Kembali
= (L : v2) x 60 menit
Ts2
T1
T2
T3
T4
Ts2
Kap.Prod. / jam =
Q2
V x Fa x 60
Ts2 x D1 x Fk
Koefisien Alat / M3 = 1 : = 1 : Q2
(E09)
(E16)
v
b
n
Lajur lintasan
Lebar Overlap
Faktor Efisiensi alat
Apabila N <= 1
Kap. Prod. / jam =
bo
Fa
Apabila N > 1
Kap. Prod. / jam =
Koefisien Alat / M3
2.d.
(v x 1000) x b x t x Fa
n
Q3
(v x 1000) x (N(b-bo)+bo) x t x Fa x D1
n
Q3
= 1 : Q3
ASPHALT SPRAYER
Kapasitas alat
Faktor efisiensi alat
Kapasitas pompa aspal
(E03)
V
Fa
pas
Pemakaian aspal =
M10
2.e.
3.
pas x Fa x 60 x D2 x 1000
1000 x M10
Koefisien Alat / M3
= 1 : Q4
ALAT BANTU
diperlukan setiap :
- Kereta dorong
- Sekop
- Sapu
- Sikat
- Karung
- Cerek Aspal
- Kaleng Aspal
=
=
=
=
=
=
=
75.00
3
5
5
3
5
3
3
M3 pekerjaan
buah
buah
buah
buah
buah
buah
buah
:
- Pekerja
- Mandor
Q1
Qt
P
M
= (Tk x P) / Qt
= (Tk x M) / Qt
Q4
(E03)
TENAGA
Produksi menentukan (Produksi Wheel Loader)
Produksi Lapen / hari = Q1 x Tk
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M3
4.
(E16)
: 8.1 (7)
: Penetrasi Macadam Utk.Pek.Minor
: M3
(L01)
(L03)
No.
U RAIAN
KODE
5.
6.
7.
1,769,967.10 / M3.
bulan
0.00 M3
No.
I.
1
2
3
4
5
7
II.
: 8.1 (8)
: Camp. Aspal Dingin Utk.Pek.Minor
: M3
U RAIAN
ASUMSI
Menggunakan buruh dan alat (semi mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum
- Kadar Aspal terhadap berat total campuran
- Tebal nominal padat untuk patching
Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil)
- Aspal (diambil)
- Agregat (diambil)
Faktor kembang campuran
4
III.
URUTAN KERJA
Agregat dan Aspal dicampur di dalam Pengaduk
Beton Mekanis (Concrete Mixer)
Campuran dibawa ke lokasi pekerjaan dengan
menggunakan Dump Truck
Pekerja membuat/merapikan lubang patching/galian,
campuran dihampar manual dengan alat bantu
Hamparan dipadatkan dengan Pedestrian Roller
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
1.a.
1.b.
BAHAN
Agregat Halus
Aspal Emulsi
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
1
2
3
KODE
L
Tk
Sa
As
t
D1
D2
D3
Fk
(M04)
(M31)
(E06)
V
Fa
Ts1
T1
T2
T3
T4
Ts1
V x Fa x 60
1000 x Ts1x Fk
Q1
Koefisien Alat / M3
= 1 : Q1
(E06)
2.b.
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
(E 24)
v
b
n
Fa
(v x 1000) x b x t x Fa
n
= 1 : Q2
: 8.1 (8)
: Camp. Aspal Dingin Utk.Pek.Minor
: M3
No.
2.c.
U RAIAN
Kap.Prod. / jam =
2.d.
3.
KODE
Koefisien Alat / M3
ALAT BANTU
Diperlukan :
- Sekop
- Sapu
- Alat Perata
- Gerobak Dorong
Q2
V x Fa x 60
D1 x Ts2 x Fk
Q3
= 1 : Q3
=
=
=
=
3
4
3
2
(E09)
V
Fa
v1
v2
Q1b
Tb
Ts2
T1
T2
T3
T4
Ts2
(E09)
buah
buah
buah
buah
TENAGA
Produksi menentukan (Produksi Concrete Mixer)
Produksi Campuran dalam 1 hari
Kebutuhan tenaga :
- Mandor
- Pekerja
= Tk x Q1
Q1
Qt
M
P
Koefisien Tenaga / M3 :
- Mandor
- Pekerja
= (Tk x M) : Qt
= (Tk x P) : Qt
4.
5.
6.
1,863,040.08 / M3
7.
No.
I.
1
2
3
4
5
6
II.
1
(L03)
(L01)
bulan
0.00 M3
: 8.1 (9)
: Residu Bitumen Untuk Pek.Minor
: LITER
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran :
- Aspal AC - 10 atau AC - 20
- Minyak Fluk / Pencair
Berat jenis bahan :
- Aspal AC - 10 atau AC - 20
- Minyak Fluk / Minyak Tanah (Kerosene)
Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
URUTAN KERJA
Aspal dan minyak tanah dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
KODE
L
Tk
Fh
As
K
D1
D2
2
3
III.
1.
BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan :
(1 liter x Fh)
Aspal
Kerosene
2.
2.a.
2.b.
= As x Pc x D1 : 100
= K x Pc : 100
ALAT
APHALT SPRAYER
Kapasitas alat
Faktor Efisiensi Alat
Kapasitas pompa aspal
Pc
(M10)
(M11)
(E03)
V
Fa
pas
Kap.Prod. / jam =
pas x fa x fh x 60
= 1 : Q1
Q1
(E03)
AIR COMPRESOR
(E05)
Q2
= 1 : Q2
(E09)
(E09)
= 1 : Q3
U RAIAN
TENAGA
Produksi menentukan : ASPHALT SPRAYER
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / Ltr
Q3
: 8.1 (9)
: Residu Bitumen Untuk Pek.Minor
: LITER
No.
3.
(E05)
KODE
Q1
Qt
P
M
- Pekerja
= (Tk x P) / Qt
(L01)
- Mandor
= (Tk x M) / Qt
4.
5.
6.
7.
12,263.89 / Liter
bulan
0.00 Liter
: 8.2 (1)
: Galian untuk Bahu Jalan & Pek. Minor Lain
: M3
(L03)
No.
U RAIAN
KODE
I.
1
2
3
4
5
6
II.
1
2
3
4
ASUMSI
Menggunakan tenaga pekerja
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Berat jenis bahan (lepas)
Tk
Fk
D
URUTAN KERJA
Tanah yang dipotong umumnya berada disisi jalan
Penggalian dilakukan dengan menggunakan pekerja
Selanjutnya pekerja memuat material hasil
galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
- Waktu tempuh kosong
- Lain-lain
Koefisien Alat / M3
2.d.
3.
= (L : v1) x 60
= (L : v2) x 60
V x Fa x 60
D x Fk x Ts2
= 1 : Q1
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Q1
(E08)
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang
TENAGA
Produksi Galian / hari =
Kebutuhan tenaga :
Qt
- Pekerja
- Mandor
P
M
Koefisien tenaga / M3 :
- Pekerja
= (Tk x P) : Qt
(L01)
- Mandor
4.
: 8.2 (1)
: Galian untuk Bahu Jalan & Pek. Minor Lain
: M3
No.
U RAIAN
7.
KODE
6.
(L03)
5.
= (Tk x M) : Qt
57,695.82 / M3
bulan
0.00 M3
: 8.2 (2)
: Pembersihan dan Pembongkaran Tanaman (diameter < 30 cm)
: M2
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
4
III.
1.
1a
2.
2.a
U RAIAN
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : setempat2 di sepanjang jalan
Kondisi existing jalan : sedang/baik
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor pengembangan bahan
Tebal hamparan padat
Hasil bongkaran per M2 luas area
URUTAN KERJA
Alat penyapu mekanis atau kompresor atau alat sapu yang lebih kaku
membersihkan kotoran di lokasi
Gergaji listrik atau alat tebang manual lainnya digunakan untuk menebang
tanaman, dipotong mulai dari atas ke bawah
Pembersihan dan pengangkatan akar tanaman dengan linggis dan sekop
Dump truck membawa tanaman bongkaran ke tempat pembuangan sejauh
Sekelompok pekerja membuat timbunan, pemadatan pada galian bekas
pembongkaran tanaman, merapikan dan levelling permukaan
dengan menggunakan Alat Bantu
KODE
L
Tk
Fk
t
d
= 1 x Fk
ALAT
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
(M08)
(E09)
V
Fa
v1
2.b
v2
T1
T2
T3
Ts2
Q2
V x Fa x 60
Ts2 x d
Koefisien Alat / M3
= 1 : Q2
ALAT BANTU
Diperlukan :
- Linggis
- Sekop
- Garpu
- Gergaji listrik
= 2 buah
= 2 buah
= 2 buah
= 2 buah
(E09)
TENAGA
Produksi pembersihan dan pembongkaran/hari
Qt
Kebutuhan tenaga :
- Pekerja
- Mandor
3.
P
M
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.
: 8.2 (2)
: Pembersihan dan Pembongkaran Tanaman (diameter < 30 cm)
: M2
No.
U RAIAN
7.
KODE
6.
(L01)
(L03)
5.
= (Tk x P) : Qt
= (Tk x M) : Qt
72,001.05 / M3.
bulan
0.00 M3
No.
I.
1
2
3
: 8.2 (3)
: Penebangan Pohon, diameter 30 - 50 CM
: Buah
U RAIAN
ASUMSI
Menggunakan tenaga pekerja/peralatan
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
KODE
4
5
6
II.
1
2
2
3
4
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
- Waktu tempuh kosong
- Lain-lain
Koefisien Alat / M3
'2.b.
= (L : v1) x 60
= (L : v2) x 60
V x Fa x 60
Vp x Ts x Bjk
= 1 : Q1
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts
Q1
(E09)
2.d.
Tk
Vp
BjK
= H : Tk
= 1 : Q2
Q2
(E08)
: 8.2 (3)
: Penebangan Pohon, diameter 30 - 50 CM
: Buah
No.
3.
U RAIAN
KODE
TENAGA
Produksi Galian akar pohon / hari =
Kebutuhan tenaga :
- Pekerja
- Mandor
Qt
P
M
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
6.
7.
109,154.07 / Buah
bulan
0.00 M3
(L01)
(L03)
: 8.2 (4)
: Penebangan Pohon, diameter 50 - 75 CM
: Buah
No.
I.
1
2
3
4
5
6
II.
1
2
2
3
4
U RAIAN
KODE
ASUMSI
Menggunakan tenaga pekerja/peralatan
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
1 Pohon diameter 50 - 75 cm setara dengan volume
Berat jenis kayu
Tk
Vp
Bjk
URUTAN KERJA
Pemotongon Pohon dilakukan menggunakan peralatan
Chainsaw, Kampak dan Parang
Pohon ditebang dimulai dari atas
Penggalian akar pohon dilakukan menggunakan pekerja
Pohon yang sudah ditebang dipotong-potong dan
dimuat kedalam Dump Truck menggunakan pekerja
Dump Truck membuang material hasil tebangan keluar
lokasi jalan sejauh
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
= (L : v1) x 60
(E09)
V
Fa
v1
v2
Ts2
T1
T2
= (L : v2) x 60
Koefisien Alat / M3
'2.b.
V x Fa x 60
Vp x Ts2 x bjk
= 1 : Q1
Q2
= 1 : Q2
: 8.2 (4)
: Penebangan Pohon, diameter 50 - 75 CM
: Buah
No.
3.
Q1
(E09)
2.d.
T3
T4
Ts2
U RAIAN
KODE
TENAGA
Produksi Galian akar pohon / hari =
Kebutuhan tenaga :
- Pekerja
- Mandor
Qt
P
M
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.
5.
= (Tk x P) : Qt
= (Tk x M) : Qt
(L01)
(L03)
Rp.
6.
7.
bulan
0.00 buah
No.
I.
1
2
3
4
5
164,044.40 / Buah
: 8.2 (5)
: Penebangan Pohon, diameter > 75 CM
: Buah
U RAIAN
ASUMSI
Menggunakan tenaga pekerja/peralatan
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
1 Pohon diameter > 75 cm setara dengan volume
KODE
Tk
Vp
6
II.
1
2
2
3
4
Bjk
URUTAN KERJA
Pemotongon Pohon dilakukan menggunakan peralatan
Chainsaw, Kampak dan Parang
Pohon ditebang dimulai dari atas
Penggalian akar pohon dilakukan menggunakan pekerja
Pohon yang sudah ditebang dipotong-potong dan
dimuat kedalam Dump Truck menggunakan pekerja
Dump Truck membuang material hasil tebangan keluar
lokasi jalan sejauh
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
- Waktu tempuh kosong
- Lain-lain
Koefisien Alat / M3
'2.b.
= (L : v1) x 60
= (L : v2) x 60
V x Fa x 60
Vp x Ts x Bjk
= 1 : Q1
Q1
(E08)
2.d.
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts
Q2
= 1 : Q2
(E08)
: 8.2 (5)
: Penebangan Pohon, diameter > 75 CM
: Buah
No.
3.
U RAIAN
KODE
TENAGA
Produksi Galian akar pohon / hari =
Kebutuhan tenaga :
- Pekerja
- Mandor
Qt
P
M
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
6.
7.
335,159.91 / Buah
bulan
0.00 buah
(L01)
(L03)
No.
I.
1
2
3
4
5
6
II.
1
: 8.3.(1)
: Stabilisasi Dengan Tanaman
: M2
U RAIAN
ASUMSI
Menggunakan tenaga pekerja
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (gebalan rumput) diterima seluruhnya
di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
1.
1.a.
BAHAN
Gebalan Rumput
= 1 M2 x Fh
2.
2.a.
ALAT
ALAT BANTU
- Gerobak Dorong
- Tusuk Bambu
- Pagar Tali
= 2 buah
= 5 buah / M2
= sesuai kebutuhan
4.
L
Tk
Fh
URUTAN KERJA
Gebalan rumput dipasang di atas permukaan
tanah yang telah siap ditanami
III.
3.
KODE
TENAGA
Produksi penanaman rumput dalam 1 hari
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M2 :
- Mandor
- Tukang
- Pekerja
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
(M32)
Qt
M
Tb
P
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
(L03)
(L02)
(L01)
5.
6.
10,064.23 / M2
7.
0.00 M2
: 8.3.(2)
: Semak/perdu
: M2
No.
I.
bulan
U RAIAN
1
2
3
ASUMSI
Menggunakan tenaga pekerja
Lokasi pekerjaan : di sepanjang jalan
Bahan dasar (semak/perdu) diterima seluruhnya di lokasi pekerjaan
5
6
1
2
3
URUTAN KERJA
Penggalian lubang/ penggemburan tanah dan persiapan tempat
Penanaman perdu, penimbunan dengan tanah humus
Pemagaran (sesuai kebutuhan)
II.
III.
1.
1.a.
1.b.
1.c.
BAHAN
- Semak/perdu
- Tanah humus setebal 20 cm
- Pupuk
KODE
Tk
Fh
(M32)
mxx
mxx
2.
2.a.
3.
ALAT
ALAT BANTU
- Pacul/sekop
- Gerobak Dorong
- Pagar Bambu/kayu
= 4 buah
= 1 buah
= sesuai kebutuhan
TENAGA
Produksi penanaman rumput dalam 1 hari
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M2 :
- Mandor
- Tukang
- Pekerja
Qt
M
Tb
P
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
6.
9,772.82 / M2
7.
No.
I.
(L03)
(L02)
(L01)
bulan
0.00 M2
: 8.3.(3)
: Pohon
: Buah
U RAIAN
1
2
3
4
ASUMSI
Menggunakan tenaga pekerja
Lokasi pekerjaan : di sepanjang jalan
Bahan dasar pohon dan bahan lainnya diterima di lokasi pekerjaan
ukuran lubang 0,5 x 0,5 x 0,5 m
5
6
KODE
Tk
Fh
II.
1
2
3
URUTAN KERJA
Penggalian lubang
Penanaman pohon dan penimbunan dengan tanah humus
Pemagaran (sesuai kebutuhan)
III.
1.
1.a.
1.b.
1.c.
BAHAN
- pohon
- Tanah humus setebal 20 cm
- Pupuk
2.
2.a.
ALAT
ALAT BANTU
- Pacul/sekop
- Gerobak Dorong
- Pagar Bambu/kayu
3.
(M32)
mxx
mxx
= 4 buah
= 1 buah
= sesuai kebutuhan
TENAGA
Produksi penanaman rumput dalam 1 hari
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M2 :
- Mandor
- Tukang
- Pekerja
Qt
M
Tb
P
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
6.
7.
9,197.82 / bh
bulan
0.00 bh
: 8.5.(1)
: Pengembalian kondisi lantai jembatan beton
(L03)
(L02)
(L01)
SATUAN PEMBAYARAN
: M2
No.
I.
U RAIAN
1
2
3
4
5
6
ASUMSI
Pekerjaan dilakukan secara manual/mekanis
Lokasi pekerjaan : di lokasi jembatan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tebal plat jembatan
1
2
3
4
URUTAN KERJA
Bidang yang akan dibongkar ditandai dengan cat/kapur
Dilakukan pembongkaran menggunakan Jack hammer
Pekerjaan pembesian (bila diperlukan)
Pengecoran dan merapikan
II.
III.
1.
BAHAN
- Beton K300
- Baja tulangan (bila diperlukan)
2.
2.a.
ALAT
KODE
Tk
Fk
3.
Q1
= 1 : Q1
(E05/26)
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Pahat / Tatah
= 2 buah
- Palu Besar
= 1 buah
- Alat2 pertukangan
= 1 set
TENAGA
Produksi menentukan : JACK HAMMER
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Q1
Qt
P
M
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.
5.
= (Tk x P) : Qt
= (Tk x M) : Qt
(L01)
(L03)
6.
86,561.27 / M3
7.
U RAIAN
1
2
3
4
5
6
ASUMSI
Pekerjaan dilakukan secara manual/mekanis
Lokasi pekerjaan : di lokasi jembatan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tebal Lantai Jembatan Kayu
1
2
3
4
URUTAN KERJA
Bidang yang akan dibongkar ditandai dengan cat/kapur
Dilakukan pembongkaran menggunakan linggis atau ganco
Lantai kayu yang rusak diganti dengan yang baru
Ketinggian lantai kayu harus diperhatikan kerataannya
II.
III.
1.
BAHAN
- Kayu Klas I untuk 1 m2.
- Paku dan material lainnya
2.
ALAT
2.a.
3.
0.00 M3
: 8.5.(2)
: Pengembalian kondisi lantai jembatan kayu
: M2
No.
I.
bulan
KODE
Tk
Fk
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Linggis / Ganco
= 2 buah
- Palu Besar
= 1 buah
- Alat2 pertukangan
= 1 set
TENAGA
Produksi menentukan :
Produksi Penggembalian kondisi / hari = Tk x Q1
Q1
Qt
Kebutuhan tenaga :
- Pekerja
- Mandor
P
M
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
6.
360,456.00 / M3
7.
1
2
3
4
5
6
II.
1
2
3
bulan
0.00 M3
: 8.5.(3)
: Pengembalian kondisi pelapisan permukaan baja struktur
: M2
No.
I.
(L01)
(L03)
U RAIAN
ASUMSI
Pekerjaan dilakukan secara manual/mekanis
Lokasi pekerjaan : di lokasi jembatan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
Faktor kehilangan bahan
Pelapisan permukaan dengan cat anti karat
URUTAN KERJA
Bidang permukaan yang rusak dibersihkan
Kemudian setelah bersih permukaan diampelas, sampai permukaan
yang berkarat tidak ada
Setelah bersih, dilakukan pelapisan dengan cat anti karat
III.
1.
BAHAN
- Cat anti karat per meter persegi
- Ampelas dan material lainnya
KODE
Tk
Fk
2.
2.a.
3.
ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Pahat
= 2 buah
- Alat2 pertukangan
= 1 set
TENAGA
Produksi menentukan :
Produksi Penggembalian kondisi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Q1
Qt
P
M
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
6.
7.
48,380.50 / M3
bulan
0.00 M3
(L01)
(L03)
Analisa EI-811
URAIAN ANALISA HARGA SATUAN
KOEF.
2.0
0.15
1.81
7.00
28.00
42.00
30.00
1.51
1.05
SATUAN
KM
M
jam
%
%
%
ton/m3
###
M3
1.50
0.85
0.83
M3
-
0.45
menit
141.10
M3
0.0071
jam
3.50
0.83
20.00
30.00
0.99
6.01
ton
KM/jam
KM/jam
menit
menit
KETERANGAN
Gradasi harus
memenuhi Spec.
panduan
4.01
2.00
13.00
menit
menit
menit
7.41
M3
0.1350
jam
Analisa EI-811
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
1.50
0.61
6.00
0.83
KM/jam
M
lintasan
-
18.99
M3
0.0527
jam
KETERANGAN
4.00
M3
0.07
M3
100.00 liter/menit
0.83
71.14
M3
0.0141
jam
Lump Sum
141.10
987.70
M3/jam
M3
25.00
1.00
orang
orang
0.1772
0.0071
jam
jam
Analisa EI-812
URAIAN ANALISA HARGA SATUAN
KOEF.
2.0
0.15
1.81
7.00
18.00
18.00
64.00
1.51
1.05
SATUAN
KM
M
jam
%
%
%
KETERANGAN
Gradasi harus
memenuhi
Spesifikasi
1.2586
M3
1.50
0.85
0.83
M3
-
0.45
menit
0.45
menit
141.10
M3
0.0071
jam
3.50
0.83
20.00
30.00
0.99
6.01
4.01
2.00
13.00
ton
KM/jam
KM/jam
menit
menit
menit
menit
menit
7.41
M3
0.1350
jam
Analisa EI-812
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
1.50
0.61
6.00
0.83
KM/jam
M
lintasan
-
18.99
M3
0.0527
jam
4.00
M3
0.07
M3
100.00 liter/menit
KETERANGAN
0.83
71.14
M3
0.0141
jam
Lump Sum
141.10
987.70
M3/jam
M3
15.00
1.00
orang
orang
0.1063
0.0071
jam
jam
Analisa EI-813
KOEF.
SATUAN
KETERANGAN
2.0
0.15
1.81
7.00
1.51
KM
M
Jam
1.20
M3
1.50
0.85
0.83
M3
-
0.45
menit
0.45
menit
117.71
M3
0.0085
Jam
10.00
ton
0.83
20.00 KM / Jam
30.00 KM / Jam
3.38
menit
6.01
menit
4.01
menit
10.00
menit
23.39
menit
17.76
M3
0.0563
Jam
Agregat lepas
Analisa EI-813
k. Pek. Minor
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
1.50
0.61
6.00
0.83
KM/jam
M
lintasan
-
18.99
M3
0.0527
jam
KETERANGAN
0.84
M3
0.07
M3
100.00 liter/menit
0.83
71.14
M3
0.0141
jam
Lump Sum
117.71
823.99
M3 / Jam
M3
15.00
1.00
orang
orang
0.1274
0.0085
Jam
Jam
Analisa EI-814
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
2.0
7.00
1.10
KM
Jam
-
85.00
15.00
%
%
1.80
1.81
1.51
ton / M3
0.9350
0.1650
M3
M3
1.50
M3
KETERANGAN
0.85
0.83
0.45
menit
0.45
menit
98.09
M3
0.0102
Jam
10.00
ton
0.83
40.00 KM / Jam
50.00 KM / Jam
6.12
3.01
15.00
2.40
26.53
menit
menit
menit
menit
menit
18.77
M3
0.0533
Jam
Berlanjut ke halaman berikut
Analisa EI-814
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
KETERANGAN
3.00 Km / Jam
1.20
M
0.10
M
8.00 lintasan
1.00
0.30
M
0.83
37.35
M3
M3
0.0268
Jam
Lump Sum
98.09
686.66
M3/Jam
M3
16.00
1.00
orang
orang
0.1631
0.0102
Jam
Jam
Analisa EI-815
URAIAN ANALISA HARGA SATUAN
KOEF.
2.0
SATUAN
KM
KETERANGAN
0.04
7.00
1.10
M
Jam
-
Rata-rata
1.05
55.00
37.50
1.00
6.50
%
%
%
%
2.30
1.80
2.00
1.03
100.00
1.20
ton / M3
ton / M3
ton / M3
ton / M3
m
0.7731
0.5271
25.300
157.0
M3
M3
Kg
Kg
1.50
0.85
0.83
15.00
20.00
M3
km/jam
km/jam
0.70
0.75
1.45
menit
menit
menit
33.17
M3
0.0301
Jam
Analisa EI-815
Lanjutan
KOEF.
SATUAN
50.0
0.83
ton / Jam
-
15.04
M3
0.0665
Jam
15.04
0.0665
M3
Jam
KETERANGAN
10.00
Ton
0.83
20.00 KM / Jam
30.00 KM / Jam
1.00
Ton
1.00
menit
10.00
6.01
25.00
4.01
45.02
menit
menit
menit
menit
menit
4.01
M3
0.2495
Jam
1.50 Km / Jam
0.61
M
6.00 lintasan
0.83
5.06
M3
0.1975
Jam
Lump Sum
15.04
105.25
M3 / Jam
M3
20.00
orang
2.00
orang
1.3301
0.1330
Jam
Jam
Analisa EI-815
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
KETERANGAN
Analisa EI-817
(Perata)
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
2.00
0.055
7.00
1.10
1.05
KM
M
Jam
-
133.00
25.00
5.20
94.55
Kg/M2
Kg/M2
Kg/M2
Kg/M3
1.80
1.01
1.20
ton / M3
ton / M3
KETERANGAN
(As1 : t)
1.4778
0.2778
99.2727
M3
M3
Kg
1.50
0.85
0.83
M3
-
0.45
menit
0.45
menit
117.58
M3
0.0085
Jam
10.00
ton
0.83
20.00 KM / Jam
30.00 KM / Jam
Analisa EI-817
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
2.36
6.01
2.00
4.01
14.38
menit
menit
menit
menit
menit
16.03
M3
0.0624
Jam
2.00 Km / Jam
1.70
M
6.00 lintasan
KETERANGAN
2.00
0.30
0.83
M
-
M3
84.909
M3
0.0118
Jam
800.00
liter
0.83
55
liter/menit
99.2727
kg/m3
27.87
m3
0.0359
Jam
Lump Sum
117.58
823.08
M3/Jam
M3
20.00
2.00
orang
orang
0.1701
0.0170
Jam
Jam
Analisa EI-817
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
KETERANGAN
Analisa EI-818
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
2.0
7.00
KM
jam
19.00
7.00
0.04
MM
%
M
2.01
1.00
1.60
1.20
Ton/M3
Ton/M3
Ton/M3
KETERANGAN
Rata-rata
diambil
1.1683
140.700
M3
Kg
250.00
0.83
liter
-
0.50
1.00
0.30
0.20
2.00
menit
menit
menit
menit
menit
5.188
M3
0.1928
jam
1.50
0.61
6.00
0.83
KM/jam
M
lintasan
-
5.06
M3
0.1975
jam
Analisa EI-818
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
KETERANGAN
10.00
ton
0.83
20.00 KM / Jam
30.00 KM / Jam
0.17
M3
2.00
menit
47.95
6.01
10.00
4.01
67.97
menit
menit
menit
menit
menit
3.04
M3
Melayani 1 buah
molen
0.3292
Jam
5.188
36.31
2.00
12.00
M3/Jam
M3
orang
orang
0.3855
2.3133
jam
jam
Analisa EI-819
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
2.0
7.00
1.10
KM
Jam
-
87.00
13.00
%
%
1.03
0.80
Kg / Ltr
Kg / Ltr
KETERANGAN
100 bagian
15 bagian
1.10
liter
0.99
0.14
Kg
liter
campuran
800.00
liter
0.83
55.00 liter/menit
3,012.90
liter
0.0003
Jam
3,012.90
liter
0.0003
Jam
3,012.90
liter
0.0003
Jam
Analisa EI-819
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
3,012.90
21,090.30
liter
liter
10.00
1.00
orang
orang
KETERANGAN
0.0033
Jam
0.0003
Jam
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
KETERANGAN
7.00
Jam
1.20
1.60 ton/m3
2.00
Km
10.0
0.83
20.00
30.00
ton
35.00
6.00
4.00
2.00
47.00
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
menit
5.52 M3 / Jam
0.1812
jam
Lump Sum
70.00
M3
10.00
1.00
orang
orang
1.0000
jam
0.1000
jam
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
KETERANGAN
Analisa EI-822
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
2.0
7.00
1.20
0.15
0.50
KETERANGAN
KM
jam
M
ton
2.00 km
1.20
M3
10.00
0.83
20.00
ton
KM/jam
Borrow Pit
30.00
KM/jam
6.01
4.01
2.00
12.02
82.87
menit
menit
menit
menit
M2
0.0121
jam
Lump Sum
500.00
5.00
1.00
0.0700
0.0140
M2
asumsi
orang
orang
jam
jam
Analisa EI-811
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
KETERANGAN
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
KETERANGAN
7.00
3.00
0.90
Jam
M3
ton/M3
2.00
Km
10.0
0.83
20.00
30.00
TON
35.00
6.00
4.00
10.00
55.00
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
0.2982
jam
buah
jam
Lump Sum
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
20.00
buah
10.00
1.00
orang
orang
3.50
0.35
jam
jam
KETERANGAN
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
7.00
5.00
0.90
Jam
M3
ton/m3
2.00
Km
10.0
0.83
20.00
30.00
ton
35.00
6.00
Km/Jam
Km/Jam
menit
menit
menit
KETERANGAN
4.00
10.00
55.00
menit
menit
0.4970
jam
jam
Lump Sum
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
20.00
M2
10.00
1.00
orang
orang
3.5000
0.3500
jam
jam
KETERANGAN
Analisa EI-825
URAIAN ANALISA HARGA SATUAN
KOEF.
7.00
10.00
SATUAN
Jam
M3
KETERANGAN
0.90
ton/m3
2.00
Km
10.0
0.83
20.00
30.00
ton
35.00
6.00
4.00
15.00
60.00
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
menit
0.92
Buah
1.0843
jam
0.75
Buah
1.33
jam
Lump Sum
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
15.00
buah
10.00
1.00
orang
orang
4.6667
0.4667
jam
jam
KETERANGAN
Analisa LI-831
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
0.00
7.00
1.10
KM
jam
-
1.1000
M2
100.00
1.00
2.00
4.00
M2
orang
orang
orang
0.0700
0.1400
0.2800
jam
jam
jam
KETERANGAN
Analisa LI-832
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
7.00
1.10
jam
-
1.10
0.22
0.25
M2
m3
kg
KETERANGAN
100.00
1.00
0.00
6.00
M2
orang
orang
orang
0.0700
0.0000
0.4200
jam
jam
jam
Analisa LI-833
URAIAN ANALISA HARGA SATUAN
KOEF.
7.00
1.10
SATUAN
jam
-
KETERANGAN
1.00
0.22
0.50
bh
m3
kg
100.00
1.00
0.00
6.00
M2
orang
orang
orang
0.0700
0.0000
0.4200
jam
jam
jam
Analisa EI-851
KOEF.
SATUAN
7.00
1.10
0.20
Jam
cm
0.22
m3
kg
7.50
M3 / Jam
KETERANGAN
(E05/26/10/15)
0.1333
Jam
Lump Sump
7.50
52.50
M3/Jam
M3
12.00
1.00
orang
orang
1.6000
0.1333
Jam
Jam
Analisa EI-851
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
7.00
1.10
0.10
Jam
cm
0.10
0.20
m3
kg
KETERANGAN
Lump Sump
1.00
7.00
M2/Jam
M2/Hari
4.00
1.00
4.0000
1.0000
orang
orang
Jam
Jam
Analisa EI-851
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
7.00
1.10
0.10
Jam
cm
0.60
2.00
kg
Lb
KETERANGAN
Lump Sump
0.75
5.25
M2/Jam
M2/Hari
2.00
0.50
orang
orang
2.6667
0.6667
Jam
Jam
Analis
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
MATA PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.1 (1)
: Pondasi Agregat Kls. A Untuk : M3
Pek. Minor
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
jam
jam
PERKIRAAN
KUANTITAS
0.1772
0.0071
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(R
5,950.00
7,130.00
BAHAN
1.
2.
Agregat Kasar
Agregat Halus
(M03)
(M04)
(M03)
(M04)
M3
M3
1.2586
0.0000
326,724.15
326,724.15
PERALATAN
1.
2.
3.
4.
5.
Wheel Loader
Dump Truck
Pedestrian Roller
Water Tanker
Alat Bantu
E15
E08
E24
E23
jam
jam
jam
jam
Ls
0.0071
0.1350
0.0527
0.0141
1.0000
331,200.00
101,000.00
59,700.00
178,400.00
0.00
3
4
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
MATA PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.1 (2)
: Pondasi Agregat Kls. B Untuk : M3
Pek. Minor
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
jam
jam
PERKIRAAN
KUANTITAS
0.1063
0.0071
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
BAHAN
:
:
:
JUM
HAR
(R
1.
2.
3.
Agregat Kasar
Agregat Halus
Sirtu
(M03)
(M04)
(M16)
M3
M3
M3
1.2586
0.0000
0.0000
326,724.15
326,724.15
231,800.00
PERALATAN
1.
2.
3.
4.
5.
Wheel Loader
Dump Truck
Pedestrian Roller
Water Tanker
Alat Bantu
E15
E08
E24
E23
jam
jam
jam
jam
Ls
0.0071
0.1350
0.0527
0.0141
1.0000
331,200.00
101,000.00
59,700.00
178,400.00
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.1 (3)
PERKIRAAN VOL. PEK.
: Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup AspTOTAL HARGA (Rp.)
% THD. BIAYA PROYEK
: M3
SATUAN PEMBAYARAN
NO.
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.1274
0.0085
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(R
5,950.00
7,130.00
BAHAN
1.
M3
1.2000
287,138.80
PERALATAN
1
2
3
4
5
Wheel Loader
Dump Truck
Pedestrian Roller
Water Tanker
Alat Bantu
E15
E09
E24
E23
Jam
Jam
Jam
Jam
Ls
0.0085
0.0563
0.0527
0.0141
1.0000
331,200.00
240,100.00
59,700.00
178,400.00
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.1 (4)
: Waterbound Macadam Utk. Pek. : M3
Minor
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.1631
0.0102
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
BAHAN
1.
2.
Agregat Kasar
Agregat Halus
(M03)
(M04)
(M03)
(M04)
M3
M3
0.9350
0.1650
326,724.15
326,724.15
PERALATAN
:
:
:
JUM
HAR
(R
1.
2.
3.
4.
Wheel Loader
Dump Truck
3-Wheel Roller
Alat BAntu
E15
E09
E16
Jam
Jam
Jam
Ls
0.0102
0.0533
0.0268
1.0000
331,200.00
240,100.00
137,100.00
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.1 (5)
: Camp. Aspal Panas Utk.Pek.Minor
: M3
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(R
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
(L01)
(L03)
Jam
Jam
1.3301
0.1330
5,950.00
7,130.00
BAHAN
1.
2.
3
4
Agregat Kasar
Agregat Halus
Filler
Aspal
(M03)
(M04)
(M05)
(M10)
M3
M3
Kg
Kg
0.7731
0.5271
25.3000
156.9750
326,724.15
326,724.15
750.00
9,500.00
PERALATAN
Wheel Loader
AMP
Genset
Dump Truck
Pedestrian Roller
Alat Bantu
E15
E01
E12
E09
E24
Jam
Jam
Jam
Jam
Jam
Ls
0.0301
0.0665
0.0665
0.2495
0.1975
1.0000
331,200.00
3,698,800.00
337,400.00
240,100.00
59,700.00
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.1 (7)
: Penetrasi Macadam Utk.Pek.Minor
: M3
(Perata)
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.1701
0.0170
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
BAHAN
1.
2.
3
Agregat Kasar
Agregat Halus
Aspal
(M03)
(M04)
(M10)
M3
M3
Kg
1.7556
0.0000
99.2727
326,724.15
326,724.15
9,500.00
PERALATAN
1.
2.
3.
Wheel Loader
Dump Truck
3-Wheel Roller
E15
E09
E16
Jam
Jam
Jam
0.0085
0.0624
0.0118
331,200.00
240,100.00
137,100.00
:
:
:
JUM
HAR
(R
4.
Asp. Sprayer
E03
Jam
0.0359
52,592.72
5.
Alat bantu
Ls
1.0000
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
NO.
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.1 (8)
: Camp. Aspal Dingin Utk.Pek.Minor
: M3
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
jam
jam
PERKIRAAN
KUANTITAS
2.3133
0.3855
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(R
5,950.00
7,130.00
BAHAN
1.
2.
Agregat Halus
Aspal Emulsi
(M04)
(M31)
M3
Kg
1.1683
140.7000
326,724.15
8,000.00
PERALATAN
1.
2.
3.
4.
Conc. Mixer
Pedestrian Roller
Dump Truck
Alat Bantu
E06
E24
E09
jam
jam
jam
Ls
0.1928
0.1975
0.3292
1.0000
27,861.00
59,700.00
240,100.00
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.1 (9)
: Residu Bitumen Untuk Pek.Minor
: LITER
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.0033
0.0003
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
BAHAN
1.
2.
Aspal
Kerosene
(M10)
(M11)
Kg
Liter
0.9857
0.1430
9,500.00
8,000.00
:
:
:
JUM
HAR
(R
C.
PERALATAN
1.
2.
Asphalt Sprayer
Compresor
E03
E05
Jam
Jam
0.0003
0.0003
52,592.72
110,700.00
3.
Dump Truck
E09
Jam
0.0003
240,100.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.2 (1)
: Galian untuk Bahu Jalan & Pek. Minor Lain
: M3
:
:
:
NO.
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUM
HAR
(R
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
(L01)
(L03)
Jam
Jam
1.0000
0.1000
5,950.00
7,130.00
BAHAN
PERALATAN
1
2
Dump Truck
Alat Bantu
E09
Jam
Ls
0.1812
1.0000
240,100.00
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
MATA PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.2 (2)
: Pembersihan dan Pembongkaran Tanaman
: M2
(diameter < 30 cm)
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
jam
jam
PERKIRAAN
KUANTITAS
0.0700
0.0140
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(R
5,950.00
7,130.00
BAHAN
1.
Bahan timbunan
(M08)
M3
1.2000
49,330.00
PERALATAN
1
2
Dump Truck
Alat Bantu
E09
jam
Ls
0.0121
1.0000
240,100.00
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.2 (3)
: Penebangan Pohon, diameter 30 - 50 CM
:
:
SATUAN PEMBAYARAN
NO.
: Buah
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
3.5000
0.3500
HARGA
SATUAN
JUM
HAR
(Rp.)
(R
5,950.00
7,130.00
BAHAN
PERALATAN
1.
2.
3.
Dump Truck
Chainsaw
Alat Bantu
E09
Jam
Jam
Ls
0.2982
1.0000
1.0000
240,100.00
0.00
0.00
D.
E.
F.
Note: 1
2
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.2 (4)
: Penebangan Pohon, diameter 50 - 75 CM
: Buah
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
3.5000
0.3500
HARGA
SATUAN
JUM
HAR
(Rp.)
(R
5,950.00
7,130.00
BAHAN
PERALATAN
:
:
:
1.
2.
3.
Dump Truck
Chainsaw
Alat Bantu
E09
Jam
Jam
Ls
0.4970
1.0000
1.0000
240,100.00
0.00
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.2 (5)
: Penebangan Pohon, diameter > 75 CM
: Buah
:
:
:
NO.
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
4.6667
0.4667
HARGA
SATUAN
JUM
HAR
(Rp.)
(R
5,950.00
7,130.00
BAHAN
PERALATAN
1.
2.
3.
Dump Truck
Chainsaw
Alat Bantu
E09
Jam
Jam
Ls
1.0843
1.0843
1.0000
240,100.00
0.00
0.00
3
4
Analis
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.3.(1)
: Stabilisasi Dengan Tanaman
: M2
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
0.2800
0.1400
0.0700
HARGA
SATUAN
(Rp.)
JUM
HAR
(R
5,950.00
7,760.00
7,130.00
BAHAN
1.
Gebalan Rumput
M32
M2
1.1000
5,000.00
PERALATAN
1.
Alat Bantu
Ls
1.0000
:
:
:
0.00
3
4
Analis
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.3.(2)
: Semak/perdu
: M2
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
0.4200
0.0000
0.0700
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
:
:
:
JUM
HAR
(R
B.
BAHAN
1.
Gebalan Rumput
M32
M2
1.1000
5,000.00
PERALATAN
1.
Alat Bantu
Ls
1.0000
0.00
3
4
Analis
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.3.(3)
: Pohon
: Buah
PERKIRAAN
HARGA
:
:
:
JUM
NO.
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
KUANTITAS
0.4200
0.0000
0.0700
SATUAN
(Rp.)
HAR
(R
5,950.00
7,760.00
7,130.00
B.
BAHAN
1.
- pohon
- Tanah humus setebal 20 cm
- Pupuk
bh
m3
kg
1.0000
0.2200
0.5000
5,000.00
5,000.00
5,000.00
PERALATAN
1.
Alat Bantu
Ls
1.0000
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.5.(1)
: Pengembalian kondisi lantai jembatan beton
: M2
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
1.6000
0.1333
:
:
:
HARGA
SATUAN
JUM
HAR
(Rp.)
(R
5,950.00
7,130.00
BAHAN
PERALATAN
Compressor
Jack Hammer
Wheel Loader
Alat bantu
E05
E26
E15
Jam
Jam
Jam
Ls
0.1333
0.1333
0.1333
1.0000
110,700.00
44,100.00
331,200.00
0.00
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.5.(2)
: Pengembalian kondisi lantai jembatan kayu
: M2
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
4.0000
1.0000
HARGA
SATUAN
JUM
HAR
(Rp.)
(R
5,950.00
7,130.00
BAHAN
1.
2.
Kayu Klas I
Paku
M3
Kg
0.1000
0.2000
2,750,000.00
37,550.00
PERALATAN
Alat bantu
Ls
1.0000
:
:
:
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.5.(3)
PERKIRAAN VOL. PEK.
: Pengembalian kondisi pelapisan permukaan baja strTOTAL HARGA (Rp.)
: M2
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
2.6667
0.6667
:
:
:
HARGA
SATUAN
JUM
HAR
(Rp.)
(R
5,950.00
7,130.00
B.
BAHAN
1.
2.
M2
Lb
0.6000
2.0000
35,750.00
0.00
PERALATAN
Alat bantu
Ls
1.0000
0.00
3
4
Analisa EI-811
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
1,054.22
50.53
1,104.75
411,218.05
0.00
411,218.05
2,347.27
13,639.31
3,144.38
2,507.63
0.00
21,638.59
433,961.39
65,094.21
499,055.60
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-812
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
632.53
50.53
683.06
411,218.05
0.00
0.00
411,218.05
2,347.27
13,639.31
3,144.38
2,507.63
0.00
21,638.59
433,539.70
65,030.96
498,570.66
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-813
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
758.20
60.57
818.77
344,566.56
344,566.56
2,813.62
13,519.95
3,144.38
2,507.63
0.00
21,985.58
367,370.91
55,105.64
422,476.55
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-814
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
970.49
72.69
1,043.18
305,487.08
53,909.49
359,396.57
3,376.34
12,789.27
3,670.68
0.00
19,836.29
380,276.04
57,041.41
437,317.45
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-815
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
7,914.22
948.38
8,862.59
252,575.92
172,210.86
18,975.00
1,491,262.50
1,935,024.28
9,983.73
245,992.48
22,439.13
59,905.31
11,791.43
0.00
340,128.35
2,284,015.22
342,602.28
2,626,617.51
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-817
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
1,012.05
121.28
1,133.32
573,582.40
0.00
943,090.91
1,516,673.31
2,816.73
14,976.49
1,614.67
1,887.31
0.00
21,295.19
1,539,101.82
230,865.27
1,769,967.10
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-818
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
13,763.86
2,748.92
16,512.77
381,715.91
1,125,600.00
1,507,315.91
5,370.80
11,791.43
79,043.95
0.00
96,206.17
1,620,034.85
243,005.23
1,863,040.08
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-819
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
19.75
2.37
22.11
9,364.25
1,144.00
10,508.25
17.46
36.74
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
79.69
133.89
10,664.25
1,599.64
12,263.89
Analisa EI-821
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
5,950.00
713.00
6,663.00
0.00
43,507.28
0.00
43,507.28
50,170.28
7,525.54
57,695.82
Analisa EI-822
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
e dan/atau ukuran
u satuan pekerjaan
416.50
99.82
516.32
59,196.00
59,196.00
2,897.29
0.00
2,897.29
62,609.61
9,391.44
72,001.05
Analisa EI-821
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
20,825.00
2,495.50
23,320.50
0.00
71,596.08
0.00
0.00
71,596.08
94,916.58
14,237.49
109,154.07
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-821
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
20,825.00
2,495.50
23,320.50
0.00
119,326.81
0.00
0.00
119,326.81
142,647.31
21,397.10
164,044.40
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-825
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
27,766.67
3,327.33
31,094.00
0.00
260,349.40
0.00
0.00
260,349.40
291,443.40
43,716.51
335,159.91
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa LI-831
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
1,666.00
1,086.40
499.10
3,251.50
5,500.00
5,500.00
0.00
0.00
8,751.50
1,312.73
10,064.23
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa LI-832
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
2,499.00
0.00
499.10
2,998.10
5,500.00
5,500.00
0.00
0.00
8,498.10
1,274.72
9,772.82
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa LI-833
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
2,499.00
0.00
499.10
2,998.10
5,000.00
5,000.00
0.00
0.00
7,998.10
1,199.72
9,197.82
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-851
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
9,520.00
950.67
10,470.67
0.00
14,760.00
5,880.00
44,160.00
0.00
64,800.00
75,270.67
11,290.60
86,561.27
Analisa EI-851
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
23,800.00
7,130.00
30,930.00
275,000.00
7,510.00
282,510.00
0.00
0.00
313,440.00
47,016.00
360,456.00
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-851
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
15,866.67
4,753.33
20,620.00
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
21,450.00
0.00
21,450.00
0.00
0.00
42,070.00
6,310.50
48,380.50
No.
I.
1
2
3
4
5
6
7
8
9
II.
1
2
3
: 8.4.(1)
: Marka Jalan Termoplastik
: M2
U RAIAN
(M17b)
(M33)
(M34)
1.9500
1.0500
0.4500
Kg
Liter
Kg
(E05)
V
R
40.00
3.00
Ltr/Jam
Ltr/M2
V:R
Q1
13.333
M2/Jam
= 1 : Q1
(E05)
0.0750
Jam
13.333
0.0750
M2/Jam
Jam
1.
1.a.
1.b.
1.c.
BAHAN
Cat Marka Thermoplastic
Minyak Pencair (Thinner)
Blass Bead
2.
2.a.
ALAT
COMPRESSOR
Kapasitas penyemprotan
Jumlah cat cair =
2.c.
= C x R x (BJ.Cat)
= TxR
(1 M x 1 M) x t x 1000
DUMP TRUCK
Pada dasarnya alat ini digunakan bersama-sama
dengan Compressor
Koef. Alat / M2
= 1 : Q3
ALAT BANTU
Diperlukan :
- Sapu Lidi
- Sikat Ijuk
- Rambu-rambu pengaman
- Maal Tripleks
SATUAN
2.0
7.00
1.05
0.015
1.00
65
35
Koef. Alat / M2
KOEF.
L
Tk
Fh
t
BJ.Cat
C
T
III.
2.b.
KODE
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor Kehilangan Material
Tebal lapisan cat secara manual
Berat Jenis Bahan Cat
Perbandingan pemakaian bahan :
- Cat
- Thinner
URUTAN KERJA
Permukaan jalan dibersihkan dari debu/kotoran
Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
KM
jam
M
Kg/Liter
%
%
(E08)
Q3
(E08)
Ls
=
=
=
=
3
3
2
4
buah
buah
buah
lembar
3.
TENAGA
Produksi pekerjaan per hari = Q1 x Tk
dibutuhkan tenaga :
- Mandor
- Tukang Cat
- Pekerja
Qt
M
Tb
P
93.33
1.00
3.00
8.00
M2
orang
orang
orang
(L03)
(L02)
(L01)
0.0750
0.2250
0.6000
jam
jam
jam
Koefisien Tenaga / M2 :
- Mandor
- Tukang
- Pekerja
= ( M x Tk ) : Qt
= ( Tb x Tk ) : Qt
= ( P x Tk ) : Qt
Berlanjut ke hal.
: 8.4.(1)
: Marka Jalan Termoplastik
: M2
No.
U RAIAN
4.
5.
115,946.74 / M2
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
7
8
9
II.
1
2
3
: 8.4.(2)
: Marka Jalan Bukan Termoplastic
: M2
U RAIAN
KODE
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor Kehilangan Material
Tebal lapisan cat secara manual
Berat Jenis Bahan Cat
Perbandingan pemakaian bahan :
- Cat
- Thinner
URUTAN KERJA
Permukaan jalan dibersihkan dari debu/kotoran
Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
III.
1.
1.a.
BAHAN
Cat Marka Non Thermoplastic
= C x R x (BJ.Cat)
KOEF.
SATUAN
L
Tk
Fh
t
BJ.Cat
C
T
2.0
7.00
1.05
0.0038
1.00
65
35
KM
jam
M
Kg/Liter
%
%
(M17a)
1.9500
Kg
1.b.
1.c.
2.
2.a.
ALAT
COMPRESSOR
Kapasitas penyemprotan
Jumlah cat cair =
Kap. Prod. / Jam =
Koef. Alat / M2
2.b.
2.c.
3.
= TxR
(M33)
(M34)
1.0500
0.4500
Liter
Kg
(E05)
V
R
40.00
3.00
Ltr/Jam
Ltr/M2
V:R
Q1
13.333
M2/Jam
= 1 : Q1
(E05)
0.0750
Jam
13.333
0.0750
M2/Jam
Jam
(1 M x 1 M) x t x 1000
DUMP TRUCK
Pada dasarnya alat ini digunakan bersama-sama
dengan Compressor
Koef. Alat / M2
= 1 : Q3
ALAT BANTU
Diperlukan :
- Sapu Lidi
- Sikat Ijuk
- Rambu-rambu pengaman
- Maal Tripleks
(E08)
Q3
(E08)
Ls
=
=
=
=
3
3
2
4
buah
buah
buah
lembar
TENAGA
Produksi pekerjaan per hari = Q1 x Tk
dibutuhkan tenaga :
- Mandor
- Tukang Cat
- Pekerja
Qt
M
Tb
P
93.33
1.00
3.00
8.00
M2
orang
orang
orang
(L03)
(L02)
(L01)
0.0750
0.2250
0.6000
jam
jam
jam
Koefisien Tenaga / M2 :
- Mandor
- Tukang
- Pekerja
= ( M x Tk ) : Qt
= ( Tb x Tk ) : Qt
= ( P x Tk ) : Qt
Berlanjut ke hal.
No.
: 8.4.(2)
: Marka Jalan Bukan Termoplastic
: M2
U RAIAN
4.
5.
KODE
KOEF.
SATUAN
Rp.
104,734.24 / M2
6.
7.
: 8.4.(3) .(a)
: Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade
: BH
URAIAN ANALISA HARGA S
No.
I.
1
2
3
4
5
II.
1
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
1.
1.a.
1.b.
1.c.
1.d.
2.
2.a.
BAHAN
Pelat Rambu Jadi (Engineering Grade)
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
= atur, ikat, dll.
- Angkut
= (2 x L : 25 Km/Jam) x 60 menit
- Menurunkan
= Rata-rata 2.5 menit / buah
- Lain-lain
= geser, atur, tunggu, dll.
Cp
Ts : 60
3.
4.
L
Tk
KOEF.
2.0
7.00
SATUAN
KM
jam
URUTAN KERJA
Kesatuan pondasi, pelat & tiang rambu disiapkan dan
dipasang di tempat yang telah ditentukan
III.
2.b.
KODE
ALAT BANTU
- Tang, Obeng, dll
- Pacul / Sekop
(M35a)
(M24)
(M60)
-
1.00
1.00
0.016
1.0000
BH
Batang
M3
Ls
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
15.0
Buah
30.0
9.6
37.5
30.0
107.1
menit
menit
menit
menit
menit
Q1
8.402
Buah
(E08)
0.1190
Jam
Qt
M
Tb
P
58.81
1.00
3.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1190
0.3571
0.5951
jam
jam
jam
= 2 set
= 4 buah
TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Berlanjut ke hal.
: 8.4.(3) .(a)
: Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade
: BH
URAIAN ANALISA HARGA S
No.
5.
U RAIAN
KODE
422,032.00
/ Buah
6.
7.
KOEF.
SATUAN
No.
I.
1
2
3
4
5
II.
1
: 8.4.(3) .(b)
: Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade
: BH
URAIAN ANALISA HARGA S
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
KODE
L
Tk
KOEF.
2.0
7.00
SATUAN
KM
jam
URUTAN KERJA
Kesatuan pondasi, pelat & tiang rambu disiapkan dan
dipasang di tempat yang telah ditentukan
III.
1.
1.a.
1.b.
1.c.
1.d.
2.
2.a.
BAHAN
Pelat Rambu Jadi (Engineering Grade)
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
= atur, ikat, dll.
- Angkut
= (2 x L : 25 Km/Jam) x 60 menit
(M35a)
(M24)
(M60)
(E08)
Cp
Ts
T1
T2
2.00
1.00
0.016
1.0000
BH
Batang
M3
Ls
15.0
Buah
30.0
9.6
menit
menit
- Menurunkan
- Lain-lain
Cp
Ts : 60
2.b.
3.
4.
ALAT BANTU
- Tang, Obeng, dll
- Pacul / Sekop
T3
T4
Ts
37.5
30.0
107.1
menit
menit
menit
Q1
8.402
Buah
(E08)
0.1190
Jam
Qt
M
Tb
P
58.81
1.00
3.00
6.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1190
0.3571
0.7141
jam
jam
jam
= 2 set
= 4 buah
TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Berlanjut ke hal.
: 8.4.(3) .(b)
: Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade
: BH
URAIAN ANALISA HARGA S
No.
5.
U RAIAN
6.
KODE
625,246.40
/ Buah
KOEF.
SATUAN
7.
: 8.4.(4) .(a)
: Rambu Jalan Tunggal dengan Permukaan Pemantul High Intensity Grade
: BH
URAIAN ANALISA HARGA S
No.
I.
1
2
3
4
5
II.
1
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
1.
1.a.
1.b.
1.c.
1.d.
2.
2.a.
BAHAN
Pelat Rambu Jadi (High Intensity Grade)
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
= atur, ikat, dll.
- Angkut
= (2 x L : 25 Km/Jam) x 60 menit
- Menurunkan
= Rata-rata 2.5 menit / buah
- Lain-lain
= geser, atur, tunggu, dll.
Cp
Ts : 60
3.
L
Tk
KOEF.
2.0
7.00
SATUAN
KM
jam
URUTAN KERJA
Kesatuan pondasi, pelat & tiang rambu disiapkan dan
dipasang di tempat yang telah ditentukan
III.
2.b.
KODE
ALAT BANTU
- Tang, Obeng, dll
- Pacul / Sekop
(M35b)
(M24)
(M60)
-
1.00
1.00
0.016
1.0000
BH
Batang
M3
Ls
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
15.0
Buah
30.0
9.6
37.5
30.0
107.1
menit
menit
menit
menit
menit
Q1
8.402
Buah
(E08)
0.1190
Jam
Qt
M
Tb
P
58.81
1.00
3.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1190
0.3571
0.5951
jam
jam
jam
= 2 set
= 4 buah
TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
216,500.00
/ Buah
Berlanjut ke hal.
No.
: 8.4.(4) .(a)
: Rambu Jalan Tunggal dengan Permukaan Pemantul High Intensity Grade
: BH
URAIAN ANALISA HARGA S
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
II.
1
III.
1.
1.a.
1.b.
1.c.
1.d.
2.
2.a.
: 8.4.(4) .(b)
: Rambu Jalan Ganda dengan Permukaan Pemantul High Intensity Grade
: BH
URAIAN ANALISA HARGA S
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
KODE
L
Tk
KOEF.
2.0
7.00
SATUAN
KM
jam
URUTAN KERJA
Kesatuan pondasi, pelat & tiang rambu disiapkan dan
dipasang di tempat yang telah ditentukan
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Pelat Rambu Jadi (High Intensity Grade)
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
= atur, ikat, dll.
- Angkut
= (2 x L : 25 Km/Jam) x 60 menit
- Menurunkan
= Rata-rata 2.5 menit / buah
- Lain-lain
= geser, atur, tunggu, dll.
(M35b)
(M24)
(M60)
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
2.00
1.00
0.016
1.0000
BH
Batang
M3
Ls
15.0
Buah
30.0
9.6
37.5
30.0
107.1
menit
menit
menit
menit
menit
Cp
Ts : 60
3.
ALAT BANTU
- Tang, Obeng, dll
- Pacul / Sekop
5.
8.402
Buah
(E08)
0.1190
Jam
Qt
M
Tb
P
58.81
1.00
3.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1190
0.3571
0.5951
jam
jam
jam
= 2 set
= 4 buah
TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
4.
Q1
717,582.00
/ Buah
6.
7.
No.
I.
1
2
3
4
5
6
7
II.
1
: 8.4.(5)
: Patok Pengarah
: BH
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
URUTAN KERJA
Patok ditanam di tepi luar bahu jalan sesuai dengan
gambar rencana dan di-cat
KODE
L
Tk
Fh
Rc
KOEF.
2.0
7.00
1.05
125.00
SATUAN
KM
jam
Kg/M3
III.
1.
1.a.
1.b.
1.c.
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Faktor Efisiensi Alat
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp x Fa
Ts : 60
3.
ALAT BANTU
- Pacul / Sekop
(M60)
(M39)
-
(E08)
Cp
Fa
Ts
T1
T2
T3
T4
Ts
0.0354
4.6512
M3
Kg
Ls
20.0
0.83
Buah
-
20.0
9.6
20.0
10.0
59.6
menit
menit
menit
menit
menit
17
Buah
(E08)
0.0599
Jam
Qt
M
Tb
P
116.94
1.00
4.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.0599
0.2394
0.4789
jam
jam
jam
Q1
= 4 buah
TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
131,802.37 / Buah
Berlanjut ke hal.
No.
: 8.4.(5)
: Patok Pengarah
: BH
U RAIAN
KODE
KOEF.
SATUAN
6.
7.
No.
I.
1
2
3
4
5
6
7
II.
1
2
: 8.4.(6) .(a)
: Patok Kilometer
: BH
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
KODE
KOEF.
SATUAN
L
Tk
Fh
Rc
2.0
7.00
1.05
125.00
KM
jam
Kg/M3
(M60)
(M39)
-
0.1512
18.9000
M3
Kg
Ls
URUTAN KERJA
Tempat penanaman patok disiapkan / digali
Patok Kilometer ditanam ke dalam tanah dengan
elevasi puncak patok sesuai dgn. ketentuan dan dicat
III.
1.
1.a.
1.b.
1.c.
2.b.
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
15.0
Buah
20.0
9.62
22.5
10.0
62.1
menit
menit
menit
menit
menit
Q1
14.489
Buah
(E08)
0.0690
Jam
Qt
M
101.42
1.00
Buah
orang
= 4 buah
= 2 buah
TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Tb
P
2.00
5.00
orang
orang
Koefisien Tenaga / Bh :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
504,724.48
(L03)
(L02)
(L01)
0.0690
0.1380
0.3451
jam
jam
jam
/ Buah
Berlanjut ke hal.
No.
: 8.4.(6) .(a)
: Patok Kilometer
: BH
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
7
II.
1
2
III.
: 8.4.(6) .(b)
: Patok Hektometer
: BH
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
URUTAN KERJA
Tempat penanaman patok disiapkan / digali
Patok Kilometer ditanam ke dalam tanah dengan
elevasi puncak patok sesuai dgn. ketentuan dan dicat
PEMAKAIAN BAHAN, ALAT DAN TENAGA
KODE
L
Tk
Fh
Rc
KOEF.
2.0
7.00
1.05
125.00
SATUAN
KM
jam
Kg/M3
1.
1.a.
1.b.
1.c.
BAHAN
Beton K-175
Baja Tulangan
Cat, dan material lainnya
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
(M60)
(M39)
-
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
0.0630
7.8750
M3
Kg
Ls
15.0
Buah
20.0
9.62
22.5
10.0
62.1
menit
menit
menit
menit
menit
Q1
14.489
Buah
(E08)
0.0690
Jam
Qt
M
Tb
P
###
1.00
2.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.0690
0.1380
0.3451
jam
jam
jam
= 4 buah
= 2 buah
TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
217,404.43
/ Buah
Berlanjut ke hal.
No.
6.
: 8.4.(6) .(b)
: Patok Hektometer
: BH
U RAIAN
KODE
KOEF.
SATUAN
7.
No.
I.
1
2
3
4
5
6
7
II.
1
: 8.4.(7)
: Rel Pengaman
: M'
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar rel pengaman diterima di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
2.
2,a
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
(E08)
= (2 x L : 25 Km/Jam) x 60
Cp
Ts : 60
3.
KODE
KOEF.
SATUAN
L
Tk
Fh
Rc
2.0
7.00
1.00
50.00
Km
jam
Kg/Cu.m
(M36)
(M38)
(M39)
1.0000
0.0929
4.6452
M'
M3
Kg
Ls
15.0
M'
50.0
9.62
60.0
30.0
149.6
menit
menit
menit
menit
menit
URUTAN KERJA
Kesatuam pondasi, pelat dan tiang rambu disiapkan dan
dipasang ditempat yang telah ditentukan
III.
1.
1.a.
1.b.
1.c.
1.d.
2.b.
ALAT BANTU
- Linggis / Sekop
- Kunci Baut
- Palu
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
Q1
(E08)
6.0
M'
0.1662
= 4 buah
= 2 buah
= 2 buah
TENAGA
Produksi pasang pagar pengaman / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M' :
- Mandor
= (Tk x M) : Qt
Qt
M
Tb
P
(L03)
42.11
1.00
2.00
8.00
0.1662
M'
orang
orang
orang
jam
- Tukang
- Pekerja
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
734,405.74
(L02)
(L01)
0.3325
1.3299
jam
jam
/ M'
Berlanjut ke hal.
No.
: 8.4.(7)
: Rel Pengaman
: M'
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
II.
1
2
III.
1.
1.a.
1.b.
1.c.
: 8.4.(8)
: Paku Jalan
: BH
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar paku jalan diterima di lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
KODE
Tk
Fh
KOEF.
7.00
1.05
SATUAN
jam
-
URUTAN KERJA
Tempat penanaman paku jalan disiapkan / digali
Paku jalan ditanam ke dalam perkerasan,
selanjutnya dilakukan pengecoran
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Paku jalan
Beton setara K175
mXX
(M38)
1 buah
0.0630
M3
2.
ALAT
2.a
ALAT BANTU
- Pacul / Sekop
- Alat pertukangan
3.
= 4 buah
= 2 buah
TENAGA
Produksi pasang paku jalan/ hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
144,888.11
7.
No.
I.
1
2
3
4
20.00
1.00
2.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.3500
0.7000
1.7500
jam
jam
jam
/ Buah
6.
Qt
M
Tb
P
: 8.4.(9)
: Mata Kucing
: BH
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar mata kucing diterima di lokasi pekerjaan
Jam kerja efektif per-hari
KODE
Tk
KOEF.
7.00
SATUAN
jam
1
2
URUTAN KERJA
Tempat penanaman paku jalan disiapkan / digali
Paku jalan ditanam ke dalam perkerasan,
selanjutnya dilakukan pengecoran
II.
III.
1.
1.a.
1.b.
1.c.
2.
2.b.
3.
Fh
mXX
(M38)
1.05
1 buah
0.0630
M3
ALAT
ALAT BANTU
- Pacul / Sekop
- Alat pertukangan
= 4 buah
= 2 buah
TENAGA
Produksi pasang mata kucing/ hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
187,955.61
/ Buah
6.
7.
Qt
M
Tb
P
20.00
1.00
2.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.3500
0.7000
1.7500
jam
jam
jam
No.
I.
1
2
3
4
5
6
7
II.
1
2
: 8.4.(10)
: Kerb Pracetak
: M
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (kerb pracetak) dicetak di base camp dan
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
KODE
KOEF.
SATUAN
L
Tk
Fh
Rc
2.0
7.00
1.05
125.00
KM
jam
Kg/M3
(M38)
(M39)
-
0.0788
M3
Kg
Ls
URUTAN KERJA
Tempat penanaman patok disiapkan / digali
Patok Kilometer ditanam ke dalam tanah dengan
elevasi puncak patok sesuai dgn. ketentuan dan dicat
III.
1.
1.a.
1.b.
1.c.
2.b.
ALAT BANTU
- Pacul / Sekop
- Alat pertukangan
Cp
Ts
T1
T2
T3
T4
Ts
20.0
Buah
20.0
33.38
30.0
10.0
93.4
menit
menit
menit
menit
menit
Q1
12.851
Buah
(E08)
0.0778
Jam
Qt
M
Tb
P
89.96
1.00
2.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
0.0778
0.1556
jam
jam
= 4 buah
= 1 set
TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
151,905.00
(L01)
0.3891
jam
/ Meter
Berlanjut ke hal.
No.
: 8.4.(10)
: Kerb Pracetak
: M
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
II.
1
2
III.
1.
1.a.
1.b.
1.c.
: 8.4.(12)
: Perkerasan Blok Beton pada Trotoar dan Median
: M2
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan frontage
Bahan dasar ( blok beton ) telah berada di lokasi
pekerjaan / proyek
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
KODE
L
Tk
Fh
KOEF.
SATUAN
2.0
7.00
1.05
KM
jam
-
1.05
0.05
0.50
M2
M3
Kg
URUTAN KERJA
Tempat pemasangan blok beton disiapkan / dipadatkan
Blok beton dipasang dilelevasi sesuai dengan ketentuan/
gambar
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
luas =
Paving Blok
Pasir
volume =
1x1x0,05x1.05
Angker
berat =
2.
2.a.
ALAT
TAMPER
Kecepatan
Efisiensi alat
Lebar pemadatan
Banyak lintasan
Tebal lapis hamparan rata-rata
v x 1000 x Fa x Lb x tp
n
2.b.
3.
(E25)
V
Fa
Lb
n
tp
= 1 : Q1 x Vp
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
0.60
0.83
0.40
4
0.05
Q1
Km / Jam
M
lintasan
M
2.4900 M2 / Jam
(E25)
0.2410
jam
Qt
M
Tb
P
17.43
1.00
4.00
6.00
M2
orang
orang
orang
(L03)
(L02)
(L01)
0.4016
1.6064
2.4096
jam
jam
jam
9616388330.29058
= 4 buah
= 2 buah
TENAGA
Produksi paving block / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
50,848.01 / Meter
Berlanjut ke hal.
No.
: 8.4.(12)
: Perkerasan Blok Beton pada Trotoar dan Median
: M2
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
: 8.6(1)
: Kerb Pracetak Pemisah Jalan (Concrete Barrier)
SATUAN PEMBAYARAN
No.
I.
1
2
3
4
5
6
7
II.
1
2
: M
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (kerb pemisah jalan)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
2.
2.a.
ALAT
DUMP TRUK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
4.
L
Tk
Fh
Rc
KOEF.
2.0
7.00
1.05
100.00
SATUAN
KM
jam
Kg/M3
URUTAN KERJA
Tempat penanaman patok disiapkan / digali
Patok Kilometer ditanam ke dalam tanah dengan
elevasi puncak patok sesuai dgn. ketentuan dan dicat
III.
1.
1.a.
1.b.
2.b.
KODE
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Cetakan besi
(EI-715) 0.2570
(M39)b 26.9837
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
M3
Kg
10.0
Buah
20.0
9.62
15.0
10.0
54.6
menit
menit
menit
menit
menit
Q1
10.985
Buah
(E08)
0.0910
Jam
Qt
M
Tb
P
76.90
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.0910
0.1821
0.7282
jam
jam
jam
= 4 buah
= 2 buah
TENAGA
Produksi pasang kerb pemisah jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5.
881,336.23 / Meter
Berlanjut ke hal.
No.
: 8.6(1)
: Kerb Pracetak Pemisah Jalan (Concrete Barrier)
: M
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
II.
1
2
3
III.
1.
1.a.
1.b.
1.c.
1.d.
1.e.
1.f.
: 8.7(1)
: Unit lampu penerangan jalan tunggal
Type sodium 250 watt
: Buah
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
KODE
KOEF.
SATUAN
L
Tk
Fh
2.0
7.00
1.10
KM
jam
-
(EI-715)
(M39)b
1.00
1.00
15.00
0.72
58.80
1.00
buah
buah
m1
M3
Kg
buah
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Tiang lampu type tunggal, Lighting Pole Galvanis, H=11
Lampu sodium 250 watt
Kabel type
NYY/NYM 2 x 2,5 mm2
Beton K 250
Reinforcing Steel deform = 56 x 1.05
MCB,1P, 16 A
1.g.
1.h.
1.i.
1.j.
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
0.72
1.21
15.00
1.00
M3
Kg
M3
buah
10.0
buah
20.0
9.62
15.0
10.0
54.6
menit
menit
menit
menit
menit
Q1
10.985
Buah
(E08)
0.0910
Jam
Qt
M
Tb
P
76.90
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.0910
0.1821
0.7282
jam
jam
jam
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
Berlanjut ke hal.
No.
: 8.7(1)
: Unit lampu penerangan jalan tunggal
Type sodium 250 watt
: Buah
U RAIAN
4.
5.
KODE
KOEF.
SATUAN
Rp.
24,268,437.82
/ buah
6.
7.
: 8.7(2)
: Unit lampu penerangan jalan ganda
Type sodium 250 watt
: Buah
No.
I.
1
2
3
4
5
6
II.
1
2
3
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
4.
L
Tk
Fh
KOEF.
SATUAN
2.0
7.00
1.10
KM
jam
-
0.2570
1.0000
2.0000
100.00
bh
Kg
m1
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
III.
1.
1.a.
1.b.
2.b.
KODE
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
8.0
Buah
20.0
9.62
12.0
10.0
51.6
menit
menit
menit
menit
menit
Q1
9.299
Buah
(E08)
0.1075
Jam
Qt
M
Tb
P
65.09
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1075
0.2151
0.8603
jam
jam
jam
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5.
Berlanjut ke hal.
: 8.7(2)
: Unit lampu penerangan jalan ganda
Type sodium 250 watt
: Buah
SATUAN PEMBAYARAN
No.
U RAIAN
1,729,080.54 / buah
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
II.
1
2
3
: 8.7(3)
: Unit lampu penerangan jalan tunggal
Type merkuri 250 watt
: Buah
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
KODE
L
Tk
Fh
KOEF.
SATUAN
2.0
7.00
1.10
KM
jam
-
0.2570
1.0000
1.0000
100.00
bh
Kg
m1
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
III.
1.
1.a.
1.b.
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
(EI-715)
(M39)b
(E08)
Cp
Ts
T1
10.0
Buah
20.0
menit
- Angkut
- Menurunkan
- Lain-lain
= (2 x L : 25 Km/Jam) x 60
= Rata-rata 1.5 menit / buah
= geser, tunggu, dll
Cp
Ts : 60
3.
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
T2
T3
T4
Ts
9.62
15.0
10.0
54.6
menit
menit
menit
menit
Q1
10.985
Buah
(E08)
0.0910
Jam
Qt
M
Tb
P
76.90
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.0910
0.1821
0.7282
jam
jam
jam
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
Berlanjut ke hal.
: 8.7(3)
: Unit lampu penerangan jalan tunggal
Type merkuri 250 watt
: Buah
SATUAN PEMBAYARAN
No.
U RAIAN
1,708,536.26 / buah
6.
7.
KODE
KOEF.
SATUAN
No.
: 8.7(4)
: Unit lampu penerangan jalan ganda
Type merkuri 250 watt
: Buah
U RAIAN
KODE
KOEF.
SATUAN
I.
1
2
3
4
5
6
II.
1
2
3
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
2.0
7.00
1.10
KM
jam
-
0.2570
1.0000
2.0000
100.00
bh
Kg
m1
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
III.
1.
1.a.
1.b.
2.b.
L
Tk
Fh
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
(EI-715)
(M39)b
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
8.0
Buah
20.0
9.62
12.0
10.0
51.6
menit
menit
menit
menit
menit
Q1
9.299
Buah
(E08)
0.1075
Jam
Qt
M
Tb
P
65.09
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1075
0.2151
0.8603
jam
jam
jam
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
Berlanjut ke hal.
: 8.7(4)
: Unit lampu penerangan jalan ganda
Type merkuri 250 watt
: Buah
SATUAN PEMBAYARAN
No.
U RAIAN
1,729,080.54 / buah
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
II.
1
2
3
: 8.7(5)
: Unit lampu penerangan jalan tunggal
Type merkuri 400 watt
: Buah
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
KODE
L
Tk
Fh
KOEF.
SATUAN
2.0
7.00
1.10
KM
jam
-
0.2570
1.0000
1.0000
100.00
bh
Kg
m1
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
III.
1.
1.a.
1.b.
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
(EI-715)
(M39)b
(E08)
Cp
Ts
T1
T2
T3
10.0
Buah
20.0
9.62
15.0
menit
menit
menit
- Lain-lain
Cp
Ts : 60
3.
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
T4
Ts
10.0
54.6
menit
menit
Q1
10.985
Buah
(E08)
0.0910
Jam
Qt
M
Tb
P
76.90
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.0910
0.1821
0.7282
jam
jam
jam
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
Berlanjut ke hal.
: 8.7(5)
: Unit lampu penerangan jalan tunggal
Type merkuri 400 watt
: Buah
SATUAN PEMBAYARAN
No.
U RAIAN
1,708,536.26 / buah
6.
7.
KODE
KOEF.
SATUAN
No.
: 8.7(6)
: Unit lampu penerangan jalan ganda
Type merkuri 400 watt
: Buah
U RAIAN
KODE
KOEF.
SATUAN
I.
1
2
3
4
5
6
II.
1
2
3
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
2.0
7.00
1.10
KM
jam
-
0.2570
1.0000
2.0000
100.00
bh
Kg
m1
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
III.
1.
1.a.
1.b.
2.b.
L
Tk
Fh
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
(EI-715)
(M39)b
MXX
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
8.0
Buah
20.0
9.62
12.0
10.0
51.6
menit
menit
menit
menit
menit
Q1
9.299
Buah
(E08)
0.1075
Jam
Qt
M
Tb
P
65.09
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1075
0.2151
0.8603
jam
jam
jam
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
SATUAN.
Berlanjut ke hal.
: 8.7(6)
: Unit lampu penerangan jalan ganda
Type merkuri 400 watt
: Buah
SATUAN PEMBAYARAN
No.
U RAIAN
1,729,080.54 / buah
6.
7.
KODE
KOEF.
SATUAN
No.
I.
: 8.8(1)
: Pagar Pemisah Pedestrian Carbon Steel
: M1
U RAIAN
4
5
6
7
8
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar pagar pemisah pedestrian corbon steel
seluruhnya diterima di base camp
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Pipa Carbon Steel Dia 3"
= (3x2)+(1.4x2) m / 3 M
Pipa Carbon Steel Dia 1,5" = (1.0 x 20) / 3 M
1
2
URUTAN KERJA
Pagar diproduksi di Bengkel kerja Base Camp
Dipasang di tempat dengan ditanam dan di cor
1
2
3
II.
III.
1.
1.a.
1.b.
1.c.
2.
2.a.
ALAT
Flat Bed Truck
Kapsitas Bak
Waktu Siklus :
- Memuat
- Angkut V=40 Km/jam
- Kembali V=60 Km/jam
- Menurunkan
- Lain-lain
KODE
L
Tk
Fh
V1
V2
(M47)
(M60)a
(M60)b
(E11)
Cp
Ts
T1
T2
T3
T4
T5
KOEF.
SATUAN
2.0
7.00
1.05
2.93
6.67
KM
jam
M
M
0.0567
3.0800
7.0000
M3
M
M
kg
30.00
50.00
3.01
2.00
25.00
5.00
menit
menit
menit
menit
menit
Cp
Ts : 60
= 1 : Q1
Weldeng Set
Kapasitas Pengelasan
Jumlah pengelasan per meter
17.97
4.49
22.47
2.b.
3.
Nw
Cw : 60
= 1 : Q2
ALAT BANTU
Diperlukan :
- Gerinda Potong
- Gerinda
- Ampelas
- Kuas
- Cangkul, sekop dll
= 1 buah
= 1 buah/ M
= 2 Lbr
= 1 Bh
= 1 set
TENAGA
Produksi penanaman rumput / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang Las
- Pekerja
Ts
85.01
Q1
21.1741
menit
M
(E11)
0.0472
Jam
(E32)
Cw
Nw
120.00
53.92
cm/jam
cm
Q2
0.2696
(E32)
3.7091
Jam
Qt
M
Tb
P
148.22
1.00
2.00
4.00
M2
orang
orang
orang
Berlanjut ke hal.
: 8.8(1)
: Pagar Pemisah Pedestrian Carbon Steel
: M1
No.
U RAIAN
KODE
KOEF.
SATUAN
Koefisien Tenaga / M2 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
332,780.26 / Meter
(L03)
(L02)
(L01)
0.0472
0.0945
0.1889
jam
jam
jam
6.
7.
No.
I.
1
2
: 8.8(2)
: Pagar Pemisah Pedestrian Galvanised
: M1
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
KODE
KOEF.
SATUAN
3
4
5
6
7
8
1
2
URUTAN KERJA
Pagar diproduksi di Bengkel kerja Base Camp
Dipasang di tempat dengan ditanam dan di cor
II.
III.
1.
1.a.
1.b.
1.c.
2.
2.a.
ALAT
Flat Bed Truck
Kapsitas Bak
Waktu Siklus :
- Memuat
- Angkut V=40 Km/jam
- Kembali V=60 Km/jam
- Menurunkan
- Lain-lain
2.b
Cp
Ts : 60
Weldeng Set
Kapasitas Pengelasan
Jumlah pengelasan per meter
17.97
4.49
22.47
3.
Nw
Cw : 60
= 1 : Q2
ALAT BANTU
Diperlukan :
- Gerinda Potong
- Gerinda
- Ampelas
- Kuas
- Cangkul, sekop dll
= 1 buah
= 1 buah/ M
= 2 Lbr
= 1 Bh
= 1 set
TENAGA
Produksi penanaman rumput / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang Las
- Pekerja
(E11)
Cp
Ts
T1
T2
T3
T4
T5
Ts
Q1
= 1 : Q1
2.b.
(M47)
(M60)a
(M60)b
L
Tk
Fh
V1
V2
2.0
7.00
1.05
2.93
6.67
KM
jam
M
M
0.0567
3.0800
7.0000
M3
M
M
kg
30.00
50.00
3.01
2.00
25.00
5.00
85.01
menit
menit
menit
menit
menit
menit
21.1741
(E11)
0.0472
Jam
(E32)
Cw
Nw
120.00
53.92
cm/jam
cm
Q2
0.2696
(E32)
3.7091
Jam
Qt
M
Tb
P
148.22
1.00
2.00
4.00
M2
orang
orang
orang
Berlanjut ke hal.
: 8.8(2)
: Pagar Pemisah Pedestrian Galvanised
: M1
No.
U RAIAN
KODE
KOEF.
SATUAN
Koefisien Tenaga / M2 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
736,890.26 / Meter
6.
7.
(L03)
(L02)
(L01)
0.0472
0.0945
0.1889
jam
jam
jam
No.
I.
1
2
3
4
5
6
7
II.
1
2
: 8.4.(11)
: Kerb Pracetak yang digunakan kembali
: M
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar kerb pracetak lama yang digunakan kembali
dipasang dengan mortar
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
KODE
L
Tk
Fh
Rc
KOEF.
2.0
7.00
1.10
0.00
SATUAN
KM
jam
Kg/M3
URUTAN KERJA
Kerb Pracetak lama dibongkar, dipilih yang dapat digunakan
dipasang kembali dengan sedikit perbaikan
Lokasi pemasangan kerb disiapkan
III.
1.
1.a.
1.b.
1.c.
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Menunggu, dll.
V1
(M39)
-
0.0165
1.00
M3
Kg
Ls
(E06)
V2
Fa
250.00
0.83
Liter
-
T1
T2
T3
T4
Ts1
5.00
3.00
1.00
1.00
10.00
menit
menit
menit
menit
menit
(T1 + T2 + T3 + T4)
V2 x Fa x 60
1000 x Ts1
Koefisien Alat / M
2.b.
3.
= 1 / Q1 x V1
ALAT BANTU
- Pacul / Sekop
- Alat pertukangan
Q1
1.245
M3
(E06)
0.0133
jam
= 4 buah
= 1 set
TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
41,725.74
Qt
M
Tb
P
(L03)
(L02)
(L01)
0.00
0.50
1.00
3.00
0.0389
0.0778
0.2334
Buah
orang
orang
orang
jam
jam
jam
/ Meter
Berlanjut ke hal.
No.
: 8.4.(11)
: Kerb Pracetak yang digunakan kembali
: M
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
Analisa EI-841
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(1)
: Marka Jalan Termoplastik
: M2
PERKIRAAN
SATUAN KUANTITAS
Spec.10.4.3(2)(d)
NO.
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.6000
0.2250
0.0750
Spec.10.4.3(2)(e)
B.
BAHAN
1.
2.
3.
Cat Marka
Thinner
Blass Bit
M17b
M33
M34
Kg
Liter
Kg
1.9500
1.0500
0.4500
PERALATAN
1.
2.
3.
Compressor
Dump Truck
Alat Bantu
E05
E08
Jam
Jam
Ls
0.0750
0.0750
1.0000
3
4
Analisa EI-841
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-842
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(2)
: Marka Jalan Bukan Termoplastic
: M2
Spec.10.4.3(2)(d)
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.6000
0.2250
0.0750
BAHAN
Spec.10.4.3(2)(e)
1.
2.
3.
Cat Marka
Thinner
Blass Bit
(M17a)
(M33)
(M34)
Kg
Liter
Kg
1.9500
1.0500
0.4500
PERALATAN
1.
2.
3.
Compressor
Dump Truck
Alat Bantu
E05
E08
Jam
Jam
Ls
0.0750
0.0750
1.0000
3
4
Analisa EI-842
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa LI-843a
Engineering Grade
URAIAN ANALISA HARGA SATUAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(3) .(a)
: Rambu Jalan Tunggal dengan Permuka
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.5951
0.3571
0.1190
BAHAN
1.
2.
3.
4.
Pelat Rambu
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
(M35a)
(M24)
(M60)
BH
Batang
M3
Ls
1.0000
1.0000
0.0160
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.1190
1.0000
3
4
Analisa LI-843a
gineering Grade
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa LI-843b
ngineering Grade
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(3) .(b)
: Rambu Jalan Ganda dengan Permukaa
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.7141
0.3571
0.1190
BAHAN
1.
2.
Pelat Rambu
Pipa Galvanis Dia.1,6"
(M35a)
(M24)
BH
Batang
2.0000
1.0000
3.
4.
Beton K-175
Cat, dan bahan lainnya
(M60)
M3
Ls
0.0160
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.1190
1.0000
3
4
Analisa LI-843b
neering Grade
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa LI-844a
High Intensity Grade
URAIAN ANALISA HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(4) .(a)
: Rambu Jalan Tunggal dengan Permukaa
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.5951
0.3571
0.1190
BAHAN
1.
2.
3.
4.
Pelat Rambu
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
(M35b)
(M24)
(M60)
BH
Batang
M3
Ls
1.0000
1.0000
0.0160
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.1190
1.0000
3
4
Analisa LI-844a
h Intensity Grade
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa LI-844b
gh Intensity Grade
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(4) .(b)
: Rambu Jalan Ganda dengan Permukaan
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.5951
0.3571
0.1190
BAHAN
1.
2.
3.
4.
Pelat Rambu
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
(M35b)
(M24)
(M60)
BH
Batang
M3
Ls
2.0000
1.0000
0.0160
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.1190
1.0000
3
4
Analisa EI-845
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
KOMPONEN
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(5)
: Patok Pengarah
: BH
PERKIRAAN
SATUAN KUANTITAS
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.4789
0.2394
0.0599
BAHAN
1.
2.
3.
Beton K-175
Baja Tulangan
Cat, dan material lainnya
(M60)
(M39)
M3
Kg
Ls
0.0354
4.6512
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.0599
1.0000
3
4
Analisa EI-845
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-846a
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(6) .(a)
: Patok Kilometer
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.3451
0.1380
0.0690
BAHAN
1.
2.
3.
Beton K-175
Baja Tulangan
Cat, dan material lainnya
(M60)
(M39)
M3
Kg
Ls
0.1512
18.9000
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.0690
1.0000
E.
F.
Note: 1
2
3
4
Analisa EI-846a
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-846b
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(6) .(b)
: Patok Hektometer
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
Pekerja Biasa
(L01)
jam
0.3451
2.
3.
Tukang
Mandor
(L02)
(L03)
jam
jam
0.1380
0.0690
BAHAN
1.
2.
3.
Beton K-175
Baja Tulangan
Cat, dan material lainnya
(M60)
(M39)
M3
Kg
Ls
0.0630
7.8750
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.0690
1.0000
3
4
Analisa EI-846b
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-847
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
ukuran
sesuai
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(7)
: Rel Pengaman
: M'
drawing
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
PEKERJA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.3299
0.3325
0.1662
BAHAN
1.
2.
3.
4.
Rel Pengaman
Patok Beton K-175
Baja Tulangan
Baut, dan material lain
(M36)
(M38)
(M39)a
M'
buah
buah
buah
1.0000
0.0929
4.6452
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.1662
1.0000
3
4
Analisa EI-847
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-848
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(8)
: Paku Jalan
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.7500
0.7000
0.3500
BAHAN
1.
2.
3.
Beton K-175
Paku jalan
Cat, dan material lainnya
(M60)
M3
Ls
0.0630
1.0000
1.0000
PERALATAN
Alat Bantu
Ls
1.0000
3
4
Analisa EI-849
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(9)
: Mata Kucing
SATUAN PEMBAYARAN
NO.
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.7500
0.7000
0.3500
BAHAN
1.
2.
3.
Beton K-175
Mata kucing
Cat, dan material lainnya
(M60)
M3
Kg
Ls
0.0630
1.0000
1.0000
PERALATAN
1.
Alat Bantu
Ls
1.0000
3
4
Analisa EI-8410
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4 (10)
: Kerb Pracetak
: M
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.3891
0.1556
0.0778
BAHAN
1.
2
Beton K-300
(M59)
Mortar, dan material lainnya
M3
Ls
0.0788
1.0000
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.0778
1.0000
1.0000
3
4
Analisa EI-8410
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tida
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai da
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (teta
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-8412
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(12)
: Perkerasan Blok Beton pada Trotoar d
: M2
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.40
1.61
2.41
B.
BAHAN
1.
2.
3.
Paving Blok
Pasir
Angker
M2
M3
Kg
1.05
0.05
0.50
PERALATAN
1.
2.
Tamper
Alat Bantu
E25
Jam
Ls
0.24
1.00
0.0000
0.24825
D.
E.
F.
Note: 1
2
3
4
Analisa EI-8412
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-861
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
0.0000
0.24825
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.6(1)
: Kerb Pracetak Pemisah Jalan (Concrete
: M
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.73
0.18
0.09
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
0.26
26.98
PERALATAN
1.
2.
E11
Jam
Ls
0.09
1.00
Analisa EI-861
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (teta
yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.0000
0.24825
Analisa EI-871
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.7(1)
: Unit lampu penerangan jalan tunggal
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.73
0.18
0.09
BAHAN
1
2
3
4
5
6
7
8
9
10
buah
buah
m1
M3
Kg
buah
M3
Kg
M3
buah
1.00
1.00
15.00
0.72
58.80
1.00
0.72
1.21
15.00
1.00
lumpsum
C.
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.09
1.00
1.00
3
4
Berlanjut ke hal. berikut.
Analisa EI-871
KETERANGAN
0.0000
0.24825
Analisa EI-861
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.7(2)
: Unit lampu penerangan jalan ganda
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.86
0.22
0.11
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
1.00
2.00
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.11
1.00
1.00
lumpsum
3
4
Analisa EI-861
KETERANGAN
0.0000
0.24825
Analisa EI-873
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.7(3)
: Unit lampu penerangan jalan tunggal
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.73
0.18
0.09
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
1.00
1.00
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.09
1.00
1.00
lumpsum
3
4
Analisa EI-873
KETERANGAN
0.0000
0.24825
Analisa EI-874
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.7(4)
: Unit lampu penerangan jalan ganda
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.86
0.22
0.11
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
1.00
2.00
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.11
1.00
1.00
lumpsum
0.0000
0.24825
3
4
Analisa EI-874
KETERANGAN
Analisa EI-875
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.7(5)
: Unit lampu penerangan jalan tunggal
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.73
0.18
0.09
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
1.00
1.00
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.09
1.00
1.00
lumpsum
3
4
Analisa EI-875
KETERANGAN
Analisa EI-876
KETERANGAN
PROYEK
NO.
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.7(6)
: Unit lampu penerangan jalan ganda
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.86
0.22
0.11
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
1.00
2.00
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.11
1.00
1.00
lumpsum
3
4
Analisa EI-876
KETERANGAN
Analisa EI-881
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.8(1)
: Pagar Pemisah Pedestrian Carbon Stee
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.0472
0.0945
0.1889
B.
BAHAN
1.
Beton K-125
Pipa Galvanis Dia 3"
Pipa Galvanis Dia 1,5"
M47
M2
M
M
0.0567
3.0800
7.0000
C.
PERALATAN
1.
2.
3
E11
E32
Jam
Jam
Ls
0.0472
3.7091
1.0000
Lump Sum
3
4
Analisa EI-881
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-882
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
NO.
: 8.8(2)
: Pagar Pemisah Pedestrian Galvanised
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.0472
0.0945
0.1889
B.
BAHAN
1.
Beton K-125
Pipa Galvanis Dia 3"
Pipa Galvanis Dia 1,5"
M47
M76
M77
M2
M
M
0.0567
3.0800
7.0000
PERALATAN
1.
2.
3
E11
E32
Jam
Jam
Ls
0.0472
3.7091
1.0000
Lump Sum
D.
E.
F.
Note: 1
2
3
4
Analisa EI-882
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-8410
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: Pembangunan Jembatan Ujung Kassi
: SUL SEL / KAB. WAJO
: 8.4.(11)
: Kerb Pracetak yang digunakan kembali
: M
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.2334
0.0778
0.0389
BAHAN
1.
2
Mortar
Material lainnya
M3
Ls
0.0165
1.0000
C.
PERALATAN
1.
2.
Concrete Mixer
Alat Bantu
E06
Jam
Ls
0.0778
1.0000
3
4
Analisa EI-8410
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-841
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
27,500.00
12,000.00
28,600.00
110,700.00
101,000.00
0.00
:
:
:
84.92
9,846,196.95
0.10
JUMLAH
HARGA
(Rp.)
3,570.00
1,746.00
534.75
5,850.75
53,625.00
12,600.00
12,870.00
79,095.00
8,302.50
7,575.00
0.00
15,877.50
TAN ( A + B + C )
100,823.25
15,123.49
115,946.74
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-842
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
3,570.00
1,746.00
534.75
5,850.75
22,500.00
12,000.00
28,600.00
110,700.00
101,000.00
0.00
43,875.00
12,600.00
12,870.00
69,345.00
8,302.50
7,575.00
0.00
15,877.50
TAN ( A + B + C )
91,073.25
13,660.99
104,734.24
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
Analisa LI-843a
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
176,000.00
154,000.00
1,112,693.03
0.00
101,000.00
0.00
:
:
:
2.00
844,064.01
0.01
JUMLAH
HARGA
(Rp.)
3,540.85
2,770.79
848.61
7,160.24
176,000.00
154,000.00
17,803.09
0.00
347,803.09
12,021.02
0.00
12,021.02
TAN ( A + B + C )
366,984.35
55,047.65
422,032.00
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa LI-843b
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
176,000.00
154,000.00
:
:
:
2.00
1,250,492.80
0.01
JUMLAH
HARGA
(Rp.)
4,249.01
2,770.79
848.61
7,868.41
352,000.00
154,000.00
1,112,693.03
0.00
101,000.00
0.00
17,803.09
0.00
523,803.09
12,021.02
0.00
12,021.02
TAN ( A + B + C )
543,692.52
81,553.88
625,246.40
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
Analisa LI-844a
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
216,500.00
154,000.00
1,112,693.03
0.00
101,000.00
0.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
3,540.85
2,770.79
848.61
7,160.24
216,500.00
154,000.00
17,803.09
0.00
388,303.09
12,021.02
0.00
12,021.02
TAN ( A + B + C )
407,484.35
61,122.65
468,607.00
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa LI-844b
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
216,500.00
154,000.00
1,112,693.03
0.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
3,540.85
2,770.79
848.61
7,160.24
433,000.00
154,000.00
17,803.09
0.00
604,803.09
101,000.00
0.00
12,021.02
0.00
12,021.02
TAN ( A + B + C )
623,984.35
93,597.65
717,582.00
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-845
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
:
:
:
56.00
7,380,932.70
0.08
JUMLAH
HARGA
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,112,693.03
13,760.00
0.00
101,000.00
0.00
2,849.21
1,857.97
426.78
5,133.97
39,431.06
64,000.13
0.00
103,431.18
6,045.60
0.00
6,045.60
TAN ( A + B + C )
114,610.76
17,191.61
131,802.37
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-846a
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,112,693.03
13,760.00
0.00
101,000.00
0.00
TAN ( A + B + C )
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
2,053.35
1,071.19
492.11
3,616.65
168,239.19
260,064.00
0.00
428,303.19
6,971.02
0.00
6,971.02
438,890.85
65,833.63
504,724.48
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-846b
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
2,053.35
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,112,693.03
13,760.00
0.00
101,000.00
0.00
1,071.19
492.11
3,616.65
70,099.66
108,360.00
0.00
178,459.66
6,971.02
0.00
6,971.02
TAN ( A + B + C )
189,047.33
28,357.10
217,404.43
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-847
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
412,500.00
1,112,693.03
12,760.00
20,000.00
101,000.00
15,000.00
TAN ( A + B + C )
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
7,913.13
2,580.08
1,185.31
11,678.52
412,500.00
103,372.56
59,272.14
20,000.00
595,144.70
16,790.46
15,000.00
31,790.46
638,613.68
95,792.05
734,405.74
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-848
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
10,412.50
5,432.00
2,495.50
18,340.00
1,112,693.03
37,550.00
0.00
70,099.66
37,550.00
0.00
107,649.66
0.00
0.00
0.00
TAN ( A + B + C )
125,989.66
18,898.45
144,888.11
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-849
NDAR UNTUK
NG-MASING HARGA SATUAN
:
:
0.00
0.00
HARGA
SATUAN
(Rp.)
0.00
JUMLAH
HARGA
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,112,693.03
75,000.00
0.00
0.00
10,412.50
5,432.00
2,495.50
18,340.00
70,099.66
75,000.00
0.00
145,099.66
0.00
0.00
TAN ( A + B + C )
163,439.66
24,515.95
187,955.61
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-8410
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,449,289.09
0.00
178,400.00
0.00
0.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
2,315.01
1,207.69
554.82
4,077.53
114,131.52
0.00
114,131.52
13,882.26
0.00
0.00
13,882.26
TAN ( A + B + C )
132,091.31
19,813.70
151,905.00
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-8412
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
2,389.56
12,465.86
17,180.72
32,036.14
0.00
120,000.00
0.00
24,400.00
0.00
0.00
6,300.00
0.00
6,300.00
5,879.52
0.00
5,879.52
TAN ( A + B + C )
44,215.66
6,632.35
50,848.01
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-861
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,449,289.09
13,760.00
178,400.00
0.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
4,333.03
1,412.79
649.04
6,394.86
372,449.18
371,295.54
743,744.72
16,239.75
0.00
16,239.75
TAN ( A + B + C )
766,379.33
114,956.90
881,336.23
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-871
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
4,333.03
1,412.79
649.04
6,394.86
15,665,000.00
249,286.00
7,840.00
1,419,323.61
14,562.50
36,400.00
18,750.00
4,480.00
40,464.00
2,508,000.00
178,400.00
0.00
0.00
15,665,000.00
249,286.00
117,600.00
1,021,913.00
856,275.00
36,400.00
13,500.00
5,420.80
606,960.00
2,508,000.00
21,080,354.80
16,239.75
0.00
0.00
16,239.75
TAN ( A + B + C )
21,102,989.41
3,165,448.41
24,268,437.82
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
Analisa EI-861
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,449,289.09
13,760.00
178,400.00
0.00
0.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
5,118.79
1,668.98
766.74
7,554.51
1,449,289.09
27,520.00
1,476,809.09
19,184.69
0.00
0.00
19,184.69
TAN ( A + B + C )
1,503,548.29
225,532.24
1,729,080.54
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-873
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,449,289.09
13,760.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
4,333.03
1,412.79
649.04
6,394.86
1,449,289.09
13,760.00
178,400.00
0.00
0.00
1,463,049.09
16,239.75
0.00
0.00
16,239.75
TAN ( A + B + C )
1,485,683.70
222,852.56
1,708,536.26
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
Analisa EI-874
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,449,289.09
13,760.00
178,400.00
0.00
0.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
5,118.79
1,668.98
766.74
7,554.51
1,449,289.09
27,520.00
1,476,809.09
19,184.69
0.00
0.00
19,184.69
TAN ( A + B + C )
1,503,548.29
225,532.24
1,729,080.54
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-875
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,449,289.09
13,760.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
4,333.03
1,412.79
649.04
6,394.86
1,449,289.09
13,760.00
178,400.00
0.00
0.00
1,463,049.09
16,239.75
0.00
0.00
16,239.75
TAN ( A + B + C )
1,485,683.70
222,852.56
1,708,536.26
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
Analisa EI-876
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
1,449,289.09
13,760.00
178,400.00
0.00
0.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
5,118.79
1,668.98
766.74
7,554.51
1,449,289.09
27,520.00
1,476,809.09
19,184.69
0.00
0.00
19,184.69
TAN ( A + B + C )
1,503,548.29
225,532.24
1,729,080.54
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-881
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
975,279.35
0.00
0.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
281.00
732.97
1,346.93
2,360.90
55,298.34
0.00
0.00
55,298.34
178,400.00
60,200.00
0.00
8,425.37
223,289.52
0.00
231,714.90
TAN ( A + B + C )
289,374.14
43,406.12
332,780.26
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
Analisa EI-882
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
975,279.35
80,000.00
15,000.00
178,400.00
60,200.00
0.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
281.00
732.97
1,346.93
2,360.90
55,298.34
246,400.00
105,000.00
406,698.34
8,425.37
223,289.52
0.00
231,714.90
TAN ( A + B + C )
640,774.14
96,116.12
736,890.26
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-8410
NDAR UNTUK
NG-MASING HARGA SATUAN
HARGA
SATUAN
(Rp.)
5,950.00
7,760.00
7,130.00
JUMLAH HARGA TENAGA
975,279.35
0.00
:
:
:
0.00
0.00
0.00
JUMLAH
HARGA
(Rp.)
1,389.00
603.85
277.41
2,270.26
16,092.11
0.00
16,092.11
230,300.00
0.00
17,920.88
0.00
17,920.88
TAN ( A + B + C )
36,283.26
5,442.49
41,725.74
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
: 9.4
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
10,100
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
11.99
Rupiah
0.10
Rupiah
12.09
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
77,100.00
Rupiah
2.
Pelumas
62,687.50
Rupiah
Rupiah
6.31
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
155,748.23
Rupiah
155,760.32
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
3.
4.
5.
i
U1
U2
Mb
Ms
10.00 % / Tahun
10,000.00 Rp./Jam
5,950.00 Rp./Jam
4,575.00
Liter
6,425.00
Liter
6.
Minyak Pelumas
Mp
25,075.00
Liter
: 9.5
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
17,840
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
21.18
Rupiah
0.18
Rupiah
21.36
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
146,490.00
Rupiah
2.
Pelumas
119,106.25
Rupiah
Rupiah
11.15
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
281,565.21
Rupiah
281,586.56
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
10.00 % / Tahun
2.
3.
4.
5.
6.
U1
U2
Mb
Ms
Mp
10,000.00
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Rp./Jam
Liter
Liter
Liter
: 9.6
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
17,840
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
21.18
Rupiah
0.18
Rupiah
21.36
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
77,100.00
Rupiah
2.
Pelumas
62,687.50
Rupiah
Rupiah
11.15
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
155,756.46
Rupiah
155,777.81
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.7
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
BULLDOZER 100-150 HP
Pw
140.0
HP
Cp A
5.0
Tahun
W
2,000
Jam
B
843,500,000
Rupiah
1.
2.
3.
C.
84,350,000
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
100,130.93
Rupiah
843.50
Rupiah
100,974.43
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
107,940.00
Rupiah
2.
Pelumas
87,762.50
Rupiah
3.
Biaya bengkel
36,903
Rupiah
4.
5.
Perawatan dan
perbaikan
52,718.75
Rupiah
285,324.38
Rupiah
386,298.80
Rupiah
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
=
(12,5 % - 17,5 %) x B
W
=
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
3.
4.
5.
i
U1
U2
Mb
Ms
10.00 % / Tahun
10,000.00 Rp./Jam
5,950.00 Rp./Jam
4,575.00
Liter
6,425.00
Liter
6.
Minyak Pelumas
Mp
25,075.00
Liter
: 9.8
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
33,280
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
39.51
Rupiah
0.33
Rupiah
39.84
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
104,085.00
Rupiah
2.
Pelumas
84,628.13
Rupiah
15
Rupiah
20.80
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
204,698.49
Rupiah
204,738.32
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.9
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
33,120
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
39.32
Rupiah
0.33
Rupiah
39.65
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
74,016.00
Rupiah
2.
Pelumas
60,180.00
Rupiah
3.
Biaya bengkel
14
4.
Perawatan dan
perbaikan
20.70
Rupiah
5.
6.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
150,181.19
Rupiah
150,220.84
Rupiah
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
=
(12,5 % - 17,5 %) x B
W
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.10
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
34,230
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
40.63
Rupiah
0.34
Rupiah
40.98
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
53,970.00
Rupiah
2.
Pelumas
43,881.25
Rupiah
15
Rupiah
21.39
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
113,837.62
Rupiah
113,878.60
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.11
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
Pw
Cp
A
W
B
EXCAVATOR 80-140 HP
133.0
HP
0.9
M3
5.0
Tahun
2,000
Jam
349,400
Rupiah
34,940
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
41.48
Rupiah
0.35
Rupiah
41.83
Rupiah
1.
2.
3.
C.
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
102,543.00
Rupiah
2.
Pelumas
83,374.38
Rupiah
15
Rupiah
21.84
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
201,904.50
Rupiah
201,946.33
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.12
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
Pw
Cp
A
W
B
1.
2.
3.
C.
48,080
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
57.08
Rupiah
0.48
Rupiah
57.56
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
106,398.00
Rupiah
2.
Pelumas
86,508.75
Rupiah
21
Rupiah
30.05
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
208,907.84
Rupiah
208,965.39
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.13
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
13,680
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
16.24
Rupiah
0.14
Rupiah
16.38
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
63,222.00
Rupiah
2.
Pelumas
51,403.75
Rupiah
Rupiah
8.55
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
130,590.29
Rupiah
130,606.66
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.14
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
17,100
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
20.30
Rupiah
0.17
Rupiah
20.47
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
63,222.00
Rupiah
2.
Pelumas
51,403.75
Rupiah
Rupiah
10.69
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
130,593.92
Rupiah
130,614.39
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.15
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
VIBRATORY COMPACTOR
Pw
4.7
HP
Cp
121.000
Ton
A
4.0
Tahun
W
1,000
Jam
B
24,400
Rupiah
1.
2.
3.
C.
2,440
i x (1 + i)^A
(1 + i)^A - 1
0.31547
(B-C)xD
W
6.93
Rupiah
0.05
Rupiah
6.98
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
4,529.63
Rupiah
2.
Pelumas
3,535.58
Rupiah
Rupiah
4.27
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
24,021.00
Rupiah
24,027.97
Rupiah
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.16
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
15,480
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
18.38
Rupiah
0.15
Rupiah
18.53
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
77,485.50
Rupiah
2.
Pelumas
63,000.94
Rupiah
Rupiah
9.68
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
156,452.89
Rupiah
156,471.42
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.17
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
250,000
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
296.77
Rupiah
2.50
Rupiah
299.27
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
61,680.00
Rupiah
2.
Pelumas
50,150.00
Rupiah
109
Rupiah
156.25
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
128,045.63
Rupiah
128,344.90
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.18
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
2,786
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
1.32
Rupiah
0.01
Rupiah
1.33
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
7,710.00
Rupiah
2.
Pelumas
6,268.75
Rupiah
Rupiah
0.70
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
29,929.93
Rupiah
29,931.27
Rupiah
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.19
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
2,590
i x (1 + i)^A
(1 + i)^A - 1
0.40211
(B-C)xD
W
4.69
Rupiah
0.03
Rupiah
4.71
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
4,626.00
Rupiah
2.
Pelumas
3,761.25
Rupiah
Rupiah
1.62
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
24,340.00
Rupiah
24,344.71
Rupiah
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
: 9.20
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
Pw
Cp
A
W
B
JACK HAMMER
0.0
HP
1,330.0
5.0
Tahun
2,000
Jam
44,100
Rupiah
1.
2.
3.
C.
4,410
i x (1 + i)^A
(1 + i)^A - 1
0.26380
(B-C)xD
W
5.24
Rupiah
0.04
Rupiah
5.28
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
Rupiah
2.76
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
10,000.00
5,950.00
Rupiah
Rupiah
15,954.69
Rupiah
15,959.96
Rupiah
i
U1
10.00 % / Tahun
10,000.00 Rp./Jam
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
3.
4.
5.
6.
U2
Mb
Ms
Mp
5,950.00
4,575.00
6,425.00
25,075.00
Rp./Jam
Liter
Liter
Liter
KET.
E08
KETERANGAN
(E11)
KETERANGAN
(E23)
0
0
0
KETERANGAN
(E04)
KETERANGAN
(E13)
0
0
0
KETERANGAN
(E15)
KETERANGAN
(E14)
KETERANGAN
(E10)
KETERANGAN
(E07)
KETERANGAN
(E16)
KETERANGAN
(E19)
KETERANGAN
(E25)
KETERANGAN
(E18)
KETERANGAN
(E05)
KETERANGAN
(E06)
KETERANGAN
(E22)
KETERANGAN
E26
Analisa EI-101
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROPINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 10.1 (1)
: Pemeliharaan Rutin Perkerasan
: Lump Sum / Bulan
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
378.0000
75.6000
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
BAHAN
1.
2.
3.
4.
M3
M3
Liter
LS
13.4400
13.4400
1,260.0000
1.0000
412,783.70
1,900,243.84
11,517.50
20,254,000.00
PERALATAN
1.
2.
3.
Motor Grader
Flat Bed Truck (E11)
Air Compressor (E05)
(E13)
Jam
Jam
Jam
25.2000
25.2000
25.2000
332,800.00
178,400.00
110,700.00
JUMLAH
HARGA
(Rp.)
2
3
Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
Analisa EI-101
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROPINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 10.1 (2)
: Pemeliharaan Rutin Bahu Jalan
: Lump Sum / Bulan
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
126.0000
25.2000
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
BAHAN
1.
2.
Lap.Pond.Agg.Kelas B
Bahan-bahan lainnya
M3
LS
42.0000
1.0000
336,240.49
1,412,000.00
PERALATAN
1.
2.
3.
Motor Grader
Flat Bed Truck (E11)
Roller
(E16)
(E13)
Jam
Jam
Jam
12.6000
12.6000
12.6000
332,800.00
178,400.00
137,100.00
JUMLAH
HARGA
(Rp.)
2
3
Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
Analisa EI-101
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROPINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 10.1 (3)
: Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
: Lump Sum / Bulan
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
252.0000
50.4000
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
BAHAN
1.
Umum
LS
1.0000
7,499,483.00
PERALATAN
1.
2.
Motor Grader
Dump Truck
(E13)
(E08)
Jam
Jam
50.4000
50.4000
332,800.00
101,000.00
JUMLAH
HARGA
(Rp.)
2
3
Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
Analisa EI-101
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROPINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 10.1 (4)
: Pemeliharaan Rutin Perlengkapan Jalan
: Lump Sum / Bulan
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
63.0000
6.3000
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
BAHAN
1.
Umum
LS
1.0000
2,778,720.00
PERALATAN
1.
(E11)
Jam
12.6000
178,400.00
JUMLAH
HARGA
(Rp.)
2
3
Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
Analisa EI-101
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROPINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 10.1 (5)
: Pemeliharaan Rutin Jembatan
: Lump Sum / Bulan
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
756.0000
151.2000
HARGA
SATUAN
(Rp.)
5,950.00
7,130.00
BAHAN
1.
Umum
LS
1.0000
5,697,125.00
PERALATAN
1.
(E11)
Jam
126.0000
178,400.00
JUMLAH
HARGA
(Rp.)
2
3
Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
Analisa EI-1011
0.88
JUMLAH
HARGA
(Rp.)
2,249,100.00
539,028.00
2,788,128.00
5,547,812.95
25,539,277.20
14,512,054.96
20,254,000.00
65,853,145.11
8,386,560.00
4,495,680.00
2,789,640.00
15,671,880.00
84,313,153.11
12,646,972.97
96,960,126.07
12,120,015.76
6,733,342.09
Analisa EI-1012
0.28
JUMLAH
HARGA
(Rp.)
749,700.00
179,676.00
929,376.00
14,122,100.71
1,412,000.00
15,534,100.71
4,193,280.00
2,247,840.00
1,727,460.00
8,168,580.00
24,632,056.71
3,694,808.51
28,326,865.22
3,540,858.15
1,967,143.42
Analisa EI-1013
0.36
JUMLAH
HARGA
(Rp.)
1,499,400.00
359,352.00
1,858,752.00
7,499,483.00
7,499,483.00
16,773,120.00
5,090,400.00
21,863,520.00
31,221,755.00
4,683,263.25
35,905,018.25
4,488,127.28
2,493,404.05
Analisa EI-1014
0.06
JUMLAH
HARGA
(Rp.)
374,850.00
44,919.00
419,769.00
2,778,720.00
2,778,720.00
2,247,840.00
2,247,840.00
5,446,329.00
816,949.35
6,263,278.35
782,909.79
434,949.89
Analisa EI-1015
0.39
JUMLAH
HARGA
(Rp.)
4,498,200.00
1,078,056.00
5,576,256.00
5,697,125.00
5,697,125.00
22,478,400.00
22,478,400.00
33,751,781.00
5,062,767.15
38,814,548.15
4,851,818.52
2,695,454.73
No.
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
II.
: 10.1 (1)
: Pemeliharaan Rutin Perkerasan
: Lump Sum / Bulan
U RAIAN
KODE
KOEF.
SATUAN
Tk
Wr
Ws
t
h
Ar
Lp
Ap1
Ap2
Tp
Tpk
Tmd
Te
Pk
Md
7.00
6.00
2.00
0.04
0.055
1.50
7.00
1.00
2.00
360.00
1.00
1.00
1.00
15.00
3.00
jam
Meter
Meter
Meter
Meter
Ltr/M2
Km
%
%
Hari
%
%
%
orang
orang
(L01)
(L03)
378.00
75.60
Jam
Jam
13.44
13.44
9.24
1,260
10.00
M3
M3
M3
Liter
%
25.20
25.20
25.20
Jam
Jam
Jam
PEKERJA
1
2
III.
Kebutuhan Pekerja
Kebutuhan Mandor
= Pk x Tpk x Tp x Tk
= Md x Tmd x Tp x Tk
BAHAN
1
2
3
4
5
IV.
(EI-10B)
(EI-10D)
(EI-10C)
(EI-10E)
ALAT
1
2
3
Motor Grader
Flat Bed Truck
Air Compressor
= Te x Tp x Tk
= Te x Tp x Tk
= Te x Tp x Tk
(E13)
(E11)
(E05)
No.
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
II.
: 10.1 (2)
: Pemeliharaan Rutin Bahu Jalan
: Lump Sum / Bulan
U RAIAN
KODE
KOEF.
SATUAN
Tk
Wr
Ws
t
Ar
Lp
As1
As2
Tp
Tpk
Tmd
Te
Pk
Md
7.00
6.00
2.00
0.15
0.50
7.00
2.00
4.00
360.00
0.50
0.50
0.50
10.00
2.00
jam
Meter
Meter
Meter
Ltr/M2
Km
%
%
Hari
%
%
%
orang
orang
(L01)
(L03)
126.00
25.20
Jam
Jam
(EI-10A)
42.00
10.00
M3
%
(E13)
(E11)
(E16)
12.60
12.60
12.60
Jam
Jam
Jam
PEKERJA
1
2
III.
Kebutuhan Pekerja
Kebutuhan Mandor
= Pk x Tpk x Tp x Tk
= Md x Tpk x Tp x Tk
BAHAN
1
2
IV.
Lap.Pond.Agr.Kls.B = As x t x Ws x Lp x 1000
Bahan-bahan lainnya (diasumsikan)
ALAT
1
2
3
Motor Grader
Flat Bed Truck
Roller
= Te x Tp x Tk
= Te x Tp x Tk
= Te x Tp x Tk
No.
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
II.
: 10.1 (3)
: Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
: Lump Sum / Bulan
U RAIAN
KODE
KOEF.
SATUAN
Tk
Wr
Ws
Wsd
Vtp
Vpb
Lp
Ad1
Ad2
Tp
Tpk
Tmd
Te
Pk
Md
7.00
6.00
2.00
0.60
220.00
330.00
7.00
0.50
1.00
360.00
1.00
1.00
2.00
10.00
2.00
jam
Meter
Meter
Meter
M3/Km
M3/Km
Km
%
%
Hari
%
%
%
orang
orang
(L01)
(L03)
252.00
50.40
Jam
Jam
(EI-22)
(EI-323)
11.55
7.70
10.00
M3
M3
%
(E13)
(E08)
50.40
50.40
Jam
Jam
PEKERJA
1
2
III.
Kebutuhan Pekerja
Kebutuhan Mandor
= Pk x Tpk x Tp x Tk
= Md x Tpk x Tp x Tk
BAHAN
1
IV.
ALAT
1
2
Motor Grader
Dump Truck
= Te x Tp x Tk
= Te x Tp x Tk
No.
I.
1
2
3
4
5
6
7
8
9
10
11
II.
: 10.1 (4)
: Pemeliharaan Rutin Perlengkapan Jalan
: Lump Sum / Bulan
U RAIAN
KODE
KOEF.
SATUAN
Tk
Wr
Ws
Wsd
Lp
Tp
Tpk
Tmd
Te
Pk
Md
7.00
6.00
2.00
0.60
7.00
360.00
0.50
0.25
0.50
5.00
1.00
jam
Meter
Meter
Meter
Km
Hari
%
%
%
orang
orang
(L01)
(L03)
63.00
6.30
Jam
Jam
(M42)
(M12)
(M01)
-
14.00
140.00
7.00
100.00
Kg
Kg
M3
%
(E11)
12.60
Jam
PEKERJA
1
2
III.
Kebutuhan Pekerja
Kebutuhan Mandor
= Pk x Tpk x Tp x Tk
= Md x Tpk x Tp x Tk
BAHAN
1
IV.
= Te x Tp x Tk
No.
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
II.
: 10.1 (5)
: Pemeliharaan Rutin Jembatan
: Lump Sum / Bulan
U RAIAN
KODE
KOEF.
SATUAN
Tk
Wr
Ws
Kj
Lj
Wj
Lp
Tp
Tpk
Tmd
Te
Pk
Md
7.00
6.00
2.00
3.00
15.00
8.00
7.00
360.00
2.00
2.00
5.00
15.00
3.00
jam
Meter
Meter
Buah
Meter
Meter
Km
Hari
%
%
%
orang
orang
(L01)
(L03)
756.00
151.20
Jam
Jam
(M42)
(M12)
(M01)
-
105.00
1,050.00
3.65
25.00
Kg
Kg
M3
%
(E13)
(E08)
126.00
126.00
Jam
Jam
PEKERJA
1
2
III.
Kebutuhan Pekerja
Kebutuhan Mandor
= Pk x Tpk x Tp x Tk
= Md x Tpk x Tp x Tk
BAHAN
1
IV.
1
2
Motor Grader
Dump Truck
= Te x Tp x Tk
= Te x Tp x Tk
KETERANGAN
Retak sedang
Thd. Total Luas
Thd. Total Luas
Thd. Total Waktu
Thd. Total Waktu
Thd. Total Waktu
40%
40%
20%
Thd.Biaya Bahan
KETERANGAN
Thd.Biaya Bahan
KETERANGAN
Thd.Total Pjg.Jln
Thd.Total Pjg.Jln
Thd. Total Waktu
Thd. Total Waktu
Thd. Total Waktu
Thd.Biaya Bahan
KETERANGAN
385,000.00
164,360.00
840,000.00
Thd.Biaya Bahan
KETERANGAN
2,887,500.00
1,232,700.00
437,500.00
Thd.Biaya Bahan
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
III.
1.
2.
2.a.
: 10.A
: Pondasi Agregat Kls. B Untuk Pek. Rutin
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : setempat2 di sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis agregat padat
Jam kerja efektif per-hari
Berat isi padat
Berat volume agregat (lepas)
KODE
KOEF.
SATUAN
L
t
Tk
Bip
Bil
2.0
0.15
7.00
1.81
1.51
KM
M
jam
ton/m3
ton/m3
M27
1.0000
M3
1.50
0.85
0.83
M3
-
1.00
0.45
1.45
menit
menit
menit
Q1
76.81
M3
(E15)
0.0130
jam
(E08)
V
Fa
v1
v2
T1
T2
T3
3.50
0.83
20.00
30.00
4.13
6.01
4.01
ton
KM/jam
KM/jam
menit
menit
menit
URUTAN KERJA
Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan pekerja
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Agregat B
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Mencampur
- Memuat dan lain-lain
(E15)
V
Fb
Fa
Ts1
T1
T2
Ts1
V x Fb x Fa x 60
(Bip/Bil) x Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus : - Waktu memuat = V x (60/Q1) x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
T4
Ts2
2.00
16.15
menit
menit
Berlanjut ke ha
: 10.A
: Pondasi Agregat Kls. B Untuk Pek. Rutin
: M3
No.
U RAIAN
2.c.
0.2532
jam
(E24)
v
b
n
Fa
1.50
0.61
6.00
0.83
KM/jam
M
lintasan
-
Q3
18.99
M3
= 1 : Q3
(E24)
0.0527
jam
(E23)
V
Wc
pa
Fa
4.00
M3
0.07
M3
100.00 liter/menit
0.83
-
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Koefisien Alat / M3
(v x 1000) x b x t x Fa
n
2.e.
3.
SATUAN
(E09)
= 1 : Q2
pa x Fa x 60
Wc x 1000
Koefisien Alat / M3
= 1 : Q4
ALAT BANTU
Diperlukan :
- Kereta dorong
- Sekop
- Garpu
= 5 buah
= 5 buah
= 5 buah
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
Q2
KOEF.
M3
2.d.
KODE
3.95
Koefisien Alat / M3
V x Fa x 60
(Bip/Bil) x Ts2
Q4
71.14
M3
(E23)
0.0141
jam
Q1
Qt
76.81
537.66
M3/jam
M3
P
M
15.00
1.00
orang
orang
(L01)
(L03)
0.1953
0.0130
jam
jam
Berlanjut ke ha
: 10.A
: Pondasi Agregat Kls. B Untuk Pek. Rutin
: M3
No.
U RAIAN
4.
5.
386,676.57 / M3.
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
7
8
9
10
11
11
II.
1
2
: 10.B
: Camp. Aspal Panas Utk.Pek.Rutin
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal Lapis Hotmix padat
Jam kerja efektif per-hari
Faktor kehilanganmaterial :
- Agregat
- Aspal
Berat isi padat
Berat Isi Agregat (lepas)
Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm
- Agregat Pecah Mesin 0 - 5 mm
- Semen
- Asphalt
Berat Isi bahan :
- AC-WC
- Agr Pch Mesin 5 - 10 & 10 - 15 mm
- Agr Pch Mesin 0 - 5 mm
Jarak Stock pile ke Cold Bin
KODE
L
t
Tk
Fh1
Fh2
Bip
Bil
KOEF.
SATUAN
2.0
0.04
7.00
1.05
1.03
1.81
1.51
KM
M
Jam
ton/m3
ton/m3
0-5
FF
As
44.70
48.00
1.90
5.40
%
%
%
%
D1
D2
D3
l
2.32
1.42
1.57
50.00
ton / M3
ton / M3
ton / M3
m
(M92)
(M91)
(M05)
(M10)
0.0307
0.0298
1.8514
5.1615
M3
M3
Kg
Kg
(E15)
V
Fb
Fa
1.50
0.85
0.83
M3
-
5-10&10-15
URUTAN KERJA
Wheel Loader memuat Agregat dan Aspal ke dalam
Cold Bin AMP
Agregat dan aspal dicampur dan dipanaskan
dengan AMP untuk dimuat langsung kedalam
Dump Truck dan diangkut ke lokasi pekerjaan
Penghamparan dilaksanakan manual oleh pekerja
untuk keperluan penambalan/patching kecil2
dan dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparaan dengan menggunakan
Alat Bantu
III.
1.
1.a.
1.b.
1.c.
1.d.
BAHAN
Agr 5-10 & 10-15
Agr 0-5
Semen
Aspal
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Kecepatan maju
Kecepatan kembali
Waktu siklus
((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75
Vf
Vr
15.00
20.00
km/jam
km/jam
Ts1
1.10
menit
Berlanjut ke ha
: 10.B
: Camp. Aspal Panas Utk.Pek.Rutin
: M3
No.
U RAIAN
2.b.
(E15)
0.0218
Jam
(E01)
V
Fa
50.0
0.83
ton / Jam
-
Q2
17.89
M3
(E01)
0.0559
Jam
GENERATORSET ( GENSET )
Kap.Prod. / Jam = SAMA DENGAN AMP
Koefisien Alat/M3
= 1 : Q3
(E12)
Q3
(E12)
17.89
0.0559
M3
Jam
(E08)
V
Fa
v1
v2
Q2b
Tb
Ts2
T1
T2
T3
T4
Ts2
3.50
0.80
20.00
30.00
1.00
1.00
Ton
KM / Jam
KM / Jam
Ton
menit
3.50
6.01
30.00
4.01
43.52
menit
menit
menit
menit
menit
1.66
M3
(E09)
0.6010
Jam
(E02)
V
Fa
b
Q5
0.00
0.00
0.00
0.00
Koefisien Alat/M3
(E02)
0.0000
(E24)
v
b
n
Fa
1.50
0.61
6.00
0.83
= 1 : Q1
Kap.Prod. / jam =
Koefisien Alat/M3
2.e.
2.f.
SATUAN
M3
Koefisien Alat/M3
2.d.
KOEF.
45.86
Kap.Prod. / jam =
2.c.
KODE
Q1
Koefisien Alat/M3
V x Fb x Fa x 60
Fh1 x (Bip/Bil) x Ts1
V x Fa x 60
D1 x Ts2
= 1 : Q4
= 1 : Q5
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Q4
km / jam
M
M3
Jam
Km / Jam
M
lintasan
-
Berlanjut ke ha
: 10.B
: Camp. Aspal Panas Utk.Pek.Rutin
: M3
No.
U RAIAN
(v x 1000) x b x t x Fa
n
= 1 : Q6
(v x 1000) x b x t x Fa
n
Koefisien Alat/M3
= 1 : Q7
2.h.
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 4 buah
- Garpu
= 4 buah
- Tongkat Kontrol ketebalan hanparan
3.
TENAGA
Produksi menentukan : DUMP TRUCK
Produksi ATB / hari = Tk x Q4
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
474,701.26 / M3.
6.
7.
KODE
Q6
KOEF.
SATUAN
5.06
M3
(E17)
0.1975
Jam
(E18)
v
b
n
Fa
5.00
1.20
8.00
0.83
KM / jam
M
lintasan
-
Q7
24.90
M3
(E18)
0.0000
Jam
Q4
Qt
1.66
11.65
M3 / Jam
M3
P
M
10.00
2.00
orang
orang
(L01)
(L03)
6.0097
1.2019
Jam
Jam
: 10.C
: Penetrasi Macadam Utk.Pek.Rutin
: M3
No.
U RAIAN
I.
1
2
3
4
5
6
7
8
10
II.
1
2
3
4
5
III.
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal rata2 Lapen
Jam kerja efektif per-hari
Faktor kehilanganmaterial :
- Agregat
- Aspal
Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok
- Agregat Pengunci
- Aspal
:
- Paska Agregat Pokok
KODE
KOEF.
SATUAN
L
t
Tk
Fh1
Fh2
2.00
0.055
7.00
1.10
1.05
KM
M
Jam
-
Ak
Ap
As1
As2
133.00
25.00
5.20
94.55
Kg/M2
Kg/M2
Kg/M2
Kg/M3
D1
D2
1.80
1.01
Fk
1.20
ton / M3
ton / M3
URUTAN KERJA
Permukaan dasar dibersihkan dan disemprot aspal cair
bilamana diperlukan
Agregat kasar dimuat ke dalam Dump Truck
menggunakan Wheel Loader (di Base Camp)
Agregat Kasar ditebarkan (manual) sesuai tebal yang
diperlukan dan dipadatkan dengan Three Wheel
Roller (6-8 Ton) minimum 6 lintasan
Aspal disemprotkan di atas agregat kasar yang telah
diratakan menggunakan Aspal Sprayer (merata)
Agregat Pengunci ditebarkan dan dipadatkan dengan
cara yang sama dengan pemadatan agregat kasar
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
1.a.
1.b.
1.c.
BAHAN
Agregat Kasar
Agregat Pengunci
Aspal
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
- Memuat, menuang, kembali
(M03)
(M04)
(M10)
(E15)
V
Fb
Fa
Ts1
T1
Ts1
1.4778
0.2778
99.2727
M3
M3
Kg
1.50
0.85
0.83
M3
-
0.45
0.45
menit
menit
Berlanjut ke ha
: 10.C
: Penetrasi Macadam Utk.Pek.Rutin
: M3
No.
U RAIAN
2.b.
2.c.
KOEF.
SATUAN
117.58
M3
= 1 : Q1
(E15)
0.0085
Jam
(E08)
V
Fa
v1
v2
3.50
0.83
20.00
30.00
ton
KM / Jam
KM / Jam
Waktu Siklus
- Mengisi Bak = (V x 60) : (Q1 x D1 X Fk)
- Angkut
= (L : v1) x 60 menit
- Tunggu + dump + Putar
- Kembali
= (L : v2) x 60 menit
Ts2
T1
T2
T3
T4
Ts2
0.83
6.01
2.00
4.01
12.85
menit
menit
menit
menit
menit
Kap.Prod. / jam =
Q2
6.28
M3
Jam
V x Fa x 60
Ts2 x D1 x Fk
Koefisien Alat / M3 = = 1 : Q2
(E09)
0.1592
(E16)
v
b
n
Fa
2.00
1.70
6.00
0.83
Km / Jam
M
lintasan
-
Q3
25.87
M3
(E16)
0.0387
Jam
KODE
Q1
Koefisien Alat/M3
V x Fb x Fa x 60
Ts1 x Fk
(v x 1000) x b x t x Fa
n
= 1 : Q3
ASPHALT SPRAYER
Kapasitas alat
Faktor efisiensi alat
Kapasitas Pompa Aspal
Pemakaian Aspal
= As2 x Fh2 = M10
Kapasitas prod/jam
= (pas x Fa x 60 x D2 x 1000) : (1000 x kas)
Koefesien alat/jam = 1 : Q4
(E03)
V
Fa
pas
kas
Q4
800.00
liter
0.83
55.00 liter/menit
99.2727
Kg/m3
27.87
M3
0.0359
jam
Berlanjut ke ha
: 10.C
: Penetrasi Macadam Utk.Pek.Rutin
: M3
No.
2.e.
3.
U RAIAN
ALAT BANTU
diperlukan setiap :
- Kereta dorong
- Sekop
- Sapu
- Sikat
- Karung
- Cerek Aspal
- Kaleng Aspal
=
=
=
=
=
=
=
75.00
3 buah
5 buah
5 buah
3 buah
5 buah
3 buah
3 buah
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
KODE
KOEF.
SATUAN
M3 pekerjaan
TENAGA
Produksi menentukan (Produksi Wheel Loader)
Produksi Lapen / hari = Q1 x Tk
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M3 :
- Pekerja
- Mandor
1,775,644.36 / M3.
6.
7.
Q1
Qt
117.58
823.08
M3/Jam
M3
P
M
20.00
2.00
orang
orang
(L01)
(L03)
0.1701
0.0170
Jam
Jam
No.
I.
1
2
3
4
5
7
II.
: 10.D
: Camp. Aspal Dingin Utk.Pek.Rutin
: M3
U RAIAN
ASUMSI
Menggunakan buruh dan alat (semi mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum
- Kadar Aspal terhadap berat total campuran
- Tebal nominal padat
Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil)
- Aspal (diambil)
- Agregat (diambil)
Faktor kembang campuran
III.
URUTAN KERJA
Agregat dan Aspal dicampur di dalam Pengaduk
Beton Mekanis (Concrete Mixer)
Campuran dibawa ke lokasi pekerjaan dengan
menggunakan Dump Truck
Pekerja membuat/merapikan lubang patching/galian,
campuran dihampar manual dengan alat bantu
Hamparan dipadatkan dengan Pedestrian Roller
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
1.a.
1.b.
BAHAN
Agregat Halus
Aspal Emulsi
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
(T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
1
2
3
4
KODE
SATUAN
L
Tk
2.0
7.00
KM
jam
Sa
As
t
19.00
4.50
0.04
MM
%
M
D1
D2
D3
Fk
2.01
1.00
1.60
1.20
Ton/M3
Ton/M3
Ton/M3
(M04)
(M31)
(E06)
V
Fa
Ts1
T1
T2
T3
T4
Ts1
V x Fa x 60
1000 x Ts1
KOEF.
Q1
1.1997
90.4500
M3
Kg
250.00
0.83
liter
-
5.00
3.50
3.00
2.00
13.50
menit
menit
menit
menit
menit
0.922
M3
Koefisien Alat / M3
= 1 : Q1
(E06)
1.0843
jam
Berlanjut ke ha
: 10.D
: Camp. Aspal Dingin Utk.Pek.Rutin
: M3
No.
2.b.
U RAIAN
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod. / jam =
Koefisien Alat / M3
2.c.
(v x 1000) x b x t x Fa
n
Kap.Prod. / jam =
2.d.
3.
ALAT BANTU
Diperlukan :
- Sekop
- Sapu
- Alat Perata
- Gerobak Dorong
KODE
V x Fa x 60
D1 x Ts2
= 1 : Q3
=
=
=
=
3
4
3
2
KOEF.
SATUAN
v
b
n
Fa
2.50
0.65
12.00
0.83
KM/jam
M
lintasan
-
Q2
4.50
M3
0.2224
jam
6.00
0.83
40.00
50.00
0.21
13.50
M3
KM / Jam
KM / Jam
M3
menit
390.36
3.01
10.00
2.40
405.77
menit
menit
menit
menit
menit
= 1 : Q2
Koefisien Alat / M3
(E09)
V
Fa
v1
v2
Q1b
Tb
Ts2
T1
T2
T3
T4
Ts2
Q3
0.37
M3
(E09)
2.7296
Jam
Q1
Qt
M
P
0.922
6.46
1.00
12.00
M3/Jam
M3
orang
orang
buah
buah
buah
buah
TENAGA
Produksi menentukan (Produksi Concrete Mixer)
Produksi Campuran dalam 1 hari
= Tk x Q1
Kebutuhan tenaga : - Mandor
- Pekerja
Koefisien Tenaga / M3 :
- Mandor
- Pekerja
= (Tk x M) : Qt
= (Tk x P) : Qt
(L03)
(L01)
1.0843
13.0120
jam
jam
Berlanjut ke ha
: 10.D
: Camp. Aspal Dingin Utk.Pek.Rutin
: 10.D
No.
U RAIAN
4.
5.
2,185,280.41 / M3
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
II.
1
2
3
4
: 10.E
: Aspal Pengisian Retak
: LITER
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran :
- Aspal AC - 10 atau AC - 20
- Minyak Fluk / Pencair
Berat jenis bahan :
- Aspal AC - 10 atau AC - 20
- Minyak Fluk / Pencair
Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1.
BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan :
(1 liter x Fh)
Aspal
Kerosene
= As x Pc x D1 : 100
= K x Pc : 100
ALAT
APHALT SPRAYER
Kapasitas alat
Faktor Efisiensi Alat
Waktu Siklus (termasuk proses pemanasan)
Kap.Prod. / jam =
Koefisien Alat / Ltr
2.b.
KODE
KOEF.
SATUAN
L
Tk
Fh
2.0
7.00
1.10
KM
Jam
-
As
K
87.00
13.00
%
%
D1
D2
1.03
0.80
Kg / Ltr
Kg / Ltr
Pc
1.10
liter
(M10)
(M11)
0.99
0.14
Kg
liter
(E03)
V
Fa
Ts
800.00
0.83
2.00
liter
Jam
Q1
332.00
liter
(E03)
0.0030
Jam
(E05)
V
Ap
400.00
0.80
M2 / Jam
liter / M2
Q2
320.00
liter
URUTAN KERJA
Aspal dan minyak tanah dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compresor
Campuran aspal cair disemprotkan dengan Asphalt
Sprayer ke atas permukaan yang akan dilapis
Angkutan Aspal dan Minyak tanah menggunakan
Dump Truck
III.
2.
2.a.
V x Fa
Ts
= 1 : Q1
AIR COMPRESOR
Kapasitas Alat ------>> diambil
Aplikasi Lapis Resap Pengikat rata-rata (Spesifikasi)
Kap. Prod. / jam =
(V x Ap)
= 1 : Q2
(E05)
0.0031
Jam
Berlanjut ke ha
: 10.E
: Aspal Pengisian Retak
: LITER
No.
2.c.
3.
U RAIAN
KODE
KOEF.
SATUAN
(E08)
Q3
332.00
liter
(E08)
0.0030
Jam
Q1
Qt
332.00
2,324.00
liter
liter
P
M
10.00
1.00
orang
orang
(L01)
(L03)
0.0301
0.0030
Jam
Jam
= 1 : Q3
TENAGA
Produksi menentukan : ASPHALT SPRAYER
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / Ltr :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
13,245.13 / Liter
6.
7.
Analisa EI-10A
URAIAN ANALISA HARGA SATUAN
KETERANGAN
padat
Analisa EI-10A
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-10A
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-10B
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Analisa EI-10B
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-10B
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-10C
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Tabel 6.6.4.
Tabel 6.6.4.
Tabel 6.6.4.
(As1 : t)
Lihat panduan
Analisa EI-10C
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-10C
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-10D
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Analisa EI-10D
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Melayani 1 buah
molen
Analisa EI-10D
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-10E
URAIAN ANALISA HARGA SATUAN
KETERANGAN
100 bagian
15 bagian
campuran
Analisa EI-10E
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN