TOTAL BIAYA
99.8507
Cumm
Harga Jumlah % for
Satuan Harga-Harga Major
(Rupiah) (Rupiah) Items
g h i
13,925,000 13,925,000
6,581,714 0
350,360 0
400,360 0
359,789 0
- 0
- 0
- 0
- 0
3,009,529 0
25,457 0
558,969 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
47,366 0
- 0
34,145 1,554,955
- 0
- 0
- 0
848,330 0
- 0
- 0
105,509 2,115,455
125,484 2,007,744
- 0
2,024 0
41,800 0
- 0
- 0
- 0
- 0
400,620 0
384,195 0
- 0
- 0
- 0
- 0
10,460 0
395,174 0
376,634 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
10,384 0
- 0
11,530 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
71,870 0
- 0
- 0
- 0
- 0
479,190 0
- 0
- 0
- 0
428,611 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
12,100,000 0
- 0
- 0
- 0
- 0
33,000 0
1,430 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
1,702,980 0
- 0
1,101,472 36,183,355
915,699 0
915,699 6,190,125
832,936 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
14,015 8,536,537
- 0
27,640 150,306,044 47.6200
23,260 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
47,550 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
601,906 73,877,942 23.4060
- 0
398,442 0
733,560 0
344,480 0
- 0
- 0
- 0
- 0
374,590 11,986,880 3.7977
- 0
- 0
- 0
- 0
- 0
85,390 2,664,168
541,200 0
- 0
528,330 5,816,913 1.8429
- 0
- 0
- 0
- 0
- 0
- 0
87,090 0
59,340 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
192,240 0
- 0
- 0
- 0
- 0
- 0
171,960 0
- 0
- 0
569,390 0
- 0
- 0
- 0
90,090 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
23,934,650 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
315,165,119
No. Mata Perkiraan Harga % Thd.
Uraian Satuan
Pembayaran Kuantitas Satuan Total Biaya
(Rupiah) (%)
a b c d e f
13,925,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,554,955
0
0
0
0
0
0
2,115,455
2,007,744
0
0
0
0
0
0
0
0
0
0
0
0
0
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0 ###
0
0
0
36,183,355
0
6,190,125
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
8,536,537
0
150,306,044
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
73,877,942
0
0
0
0
0
0
0
0
11,986,880
0
0
0
0
0
2,664,168
0
0
5,816,913
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
ITEM PEMBAYARAN NO. : 1.8
JENIS PEKERJAAN : Manajemen Dan Keselamatan Lalu Lintas
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
File : 643073269.xlsx
ITEM PEMBAYARAN NO. : 1.18.(1)
JENIS PEKERJAAN : Relokasi utilitas Dan Pelayanan Telkom yang Ada
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
II. Pekerja
Jumlah lokasi pekerjaan Lokasi 1
1 Pekerja Org/hari 2 9,429 18,857
III. Peralatan
Jumlah lokasi pekerjaan Lokasi 1
1 Excavator Jam 1 306,503 306,503
2 Alat Bantu Buah 1 25,000 25,000
File : 643073269.xlsx
ITEM PEMBAYARAN NO. : 1.18.(3)
JENIS PEKERJAAN : Relokasi utilitas Dan Pelayanan PLN yang Ada
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
II. Pekerja
Jumlah lokasi pekerjaan Lokasi 1
1 Pekerja Org/hari 3 9,429 28,286
III. Peralatan
Jumlah lokasi pekerjaan Lokasi 1
1 Excavator Jam 1 306,503 306,503
2 Alat Bantu Buah 1 25,000 25,000
Catatan : Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
File : 643073269.xlsx
ITEM PEMBAYARAN NO. : 1.21
JENIS PEKERJAAN : Manajemen Mutu
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
II. Pekerja
Jumlah lokasi pekerjaan Lokasi 1
1 Pekerja Org/hari 1 9,429 9,429
III. Peralatan
Jumlah lokasi pekerjaan Lokasi 1
1 Penjamin Mutu Ls 1 3,000,000 3,000,000
2 Alat Bantu Buah 1 100 100
Catatan : Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
File : 643073269.xlsx
INFORMASI UMUM
No. URAIAN INFORMASI
1. Nomor Paket Kontrak : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
2. Nama Paket : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
7. Lebar jalan lama ( bahu + perkerasan + bahu ) ( 0.50 + 4.50 + 0.50 ) meter
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 23.00 Kilometer
12.00 Km = a C 6.00 Km = b
A B
18.0 Km = c
Base Camp --------->
D
21 ....................................
22 ....................................
a Karya Kabupaten Pidie
Total 180,000.00
Jumlah Harga
No. Divisi Uraian Penawaran
(Rupiah)
1 Umum 13,925,000.00
2 Drainase 0.00
7 Struktur 295,561,964.28
9 Pekerjaan Harian
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 315,636,390.94
Terbilang : Tiga Ratus Empat Puluh Tujuh Juta Dua Ratus Ribu Rupiah
Muhammad Sabirin
Direktur
DAFTAR KUANTITAS DAN HARGA
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 13,925,000.00 13,925,000.00
1.8(1) Manajemen dan Keselamatan Lalu Lintas LS 6,581,714.29 0.00
1.18.(1) Relokasi Utilitas dan Pelayanan Telkom yang Ada Bh 350,360.23 0.00
1.18.(2) Relokasi Utilitas dan Pelayanan PDAM yang Ada M1 400,360.23 0.00
1.18.(3) Relokasi Utilitas dan Pelayanan PLN yang Ada Bh 359,788.80 0.00
1.18.(4) Relokasi Utilitas dan Pelayanan Gas yang Ada Bh 0.00
1.18.(5) Relokasi Utilitas dan Pelayanan Lain yang Ada LS 0.00
1.20.1 Pengeboran, termasuk SPT dan Laporan M1 0.00
1.20.2 Sondir termasuk Laporan M1 0.00
1.21 Manajemen Mutu LS 3,009,529 0.00
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 13,925,000.00
DIVISI 2. DRAINASE
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 0.00
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 5,678,154.85
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 0.00
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 0.00
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 0.00
DIVISI 7. STRUKTUR
7.1 (5) Beton K250 M3 32.85 1,101,472.00 36,183,355.20
7.1 (6) Beton Siklop fc’=15 MPa (K-175) M3 6.76 915,699.00 6,190,125.24
7.3 (1) Baja Tulangan BJ 24 Polos Kg 609.10 14,015.00 8,536,536.50
7.3 (3) Baja Tulangan BJ 32 Ulir Kg 5,437.99 27,640.00 150,306,043.60
7.9 Pasangan Batu M3 122.74 601,906.00 73,877,942.44
7.11 (3)a Expansion Joint Tipe baja bersudut M1 32.00 374,590.00 11,986,880.00
7.13.(1) Sandaran Jembatan (Railing) M1 31.20 85,390.00 2,664,168.00
7.14 (2) Pembongkaran Beton Meter Kubik 11.01 528,330.00 5,816,913.30
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 295,561,964.28
DAFTAR KUANTITAS DAN HARGA
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 471,271.81
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
DAFTAR MATA PEMBAYARAN UTAMA
Nama Paket : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
1 Mobilisasi 4.41
TOTAL 100.00
DAFTAR MATA PEMBAYARAN PEKERJAAN UTAMA (MPPU)
Err:509 :
Satuan Harga
No. Uraian Jenis Pekerjaan Kuantitas
Ukuran Satuan
1 2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 0.00 25,457.00
JUMLAH DAFTAR 3
Total
Harga
0.00
0.00
2,115,455.45
0.00
0.00
36,183,355.20
8,536,536.50
46,835,347.15
Daftar 3: Mata Pembayaran Utama
Nama Paket : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
Err:509 :
Satuan Harga
No. Uraian Jenis Pekerjaan Kuantitas
Ukuran Satuan
1 2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 0.00 25,457.00
JUMLAH DAFTAR 3
Total
Harga
0.00
0.00
2,115,455.45
0.00
0.00
36,183,355.20
8,536,536.50
46,835,347.15
LAMPIRAN 2 PENWARAN
ANALISA HARGA LUMP SUM UNTUK MOBILISASI
B. PERALATAN
Periksa lembar 1.2-2 1.00 3,425,000 3,425,000
C. FASILITAS KONTRAKTOR
1 Base Camp M2 0.00 2,000.00 0
2 Kantor M2 0.00 80,000.00 0
3 Barak M2 0.00 2,000.00 0
4 Bengkel M2
5 Gudang, dan lain-lain M2 0.00 25,000.00 -
6 ...................... ....
D. FASILITAS DIREKSI
1 Sewa Kendaraan Roda Dua ( 4 Bulan ) Unit 1.00 5,000,000 5,000,000
2 Sewa Kendaraan Roda Empat ( 6 Bulan ) Unit
3 Sewa Gedung/Kantor/Peralatan Ls
E. FASILITAS LABORATORIUM
1 Ruang Laboratorium M2
2 Peralatan Laboratorium Set 1.00 1,000,000 1,000,000
3 Perabotan & Layanan Set
F. MOBILISASI LAINNYA
FI. PEKERJAAN DARURAT Set
1 Papan Nama Kegiatan Bh
2 Relokasi Utilitas Dan Pelayanan Telkom Yang Ada 0.00 5,000,000 0
3 Relokasi Utilitas Dan Pelayanan PLN Yang Ada .... 0.00 8,000,000 0
FII. LAIN-LAIN ....
1 Papan Nama Proyek BH 1.00 500,000 500,000
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
LAMPIRAN 2 PENWARAN
ANALISA HARGA LUMP SUM UNTUK MOBILISASI
Item Pembayaran No. : 1.2
Jenis Pekerjaan : Mobilisasi
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
B. PERALATAN
I. TENAGA
II. BAHAN
III. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan D 1.60 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Tujuh ratus empat puluh juta tiga ratus enam puluh satu ribu rupiah Faktor Konversi
Waktu siklus = T1 + T2 Ts1 0.42 menit masuk dalam
- Menggali, memuat dan berputar T1 0.32 menit waktu siklus
- Lain lain T2 0.10 menit disesuaikan dgn
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 91.89 M3 lapangan
Ts1 x Fk
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 91.89 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 643.25 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0435 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0109 Jam
Rp. 25,457.00 / M3
I. TENAGA
II. BAHAN
III. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 20.00 % Kuat Tekan min.
: - Volume Pasir Ps 80.00 % 50 kg/cm2
7 Perbandingan Batu & Mortar :
- Batu Bt 60.00 %
- Mortar (campuran semen & pasir) Mr 40.00 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.67 ton/M3
- Semen Portland D5 1.44 ton/M3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.1 M3 Lepas
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 0.1120
x {D5 x (1000)} (M12) 161.00 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.4829 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 Liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 5.00 menit
- Mengaduk T2 3.00 menit
- Menuang T3 1.00 menit
- Menunggu, dll. T4 1.00 menit
Ts1 10.00 menit
3. TENAGA
Produksi Pas. Batu yang menentukan ( Prod. C. Mixer ) Q1 2.49 M3/Jam
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt 17.43 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4016 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.2048 jam
- Pekerja = (Tk x P) : Qt (L01) 4.0161 jam
Rp. 558,969.00 / M3
A. TENAGA
B. BAHAN
C. PERALATAN
1. Whell Loader (E15) Jam 0.0089 285,929.09 2,544.77
2. Dump Truck (E08) Jam 0.2364 225,310.18 53,263.33
3. Motor Grader (E13) Jam 0.0028 368,964.60 1,033.10
4 Vibro Roller (E19) Jam 0.0033 243,468.59 803.45
5. Water tank truck (E23) Jam 0.0060 231,231.73 1,387.39
6 Alat Bantu Ls 1.0000 500.00 500.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. WHELL LOADER (E15)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi Fv 0.90
Waktu sklus Ts1
- Menggali, memuat T1 0.32 menit
- Lain lain T2 0.1 menit
Waktu Siklus = T1 x Fv Ts1 0.42 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 91.89 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 643.25 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0357 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0089 Jam
Rp. 105,509.00 / M3
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0591 306,503.08 18,114.33
2. Dump Truck (E04) Jam 0.0241 389,144.83 9,378.39
3. Alat bantu Ls 1.0000 1,000.00 1,000.00
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
7 Pengurugan kembali (backfill) untuk struktur Uk 50.00 %/M3
1. BAHAN
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman < 40 %) Fv 0.9 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali, memuat, lain-lain (standar) T1 0.32 menit
Waktu siklus = T1 x Fv Ts1 0.29 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 938.07 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0298 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0075 Jam
Rp. 34,144.83 / M3
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader Jam 0.0089 285,929.09 2,544.77
2. Dump Truck Jam 0.1069 225,310.18 24,085.66
3. Motor Grader Jam 0.0014 368,964.60 516.55
4. Vibrator Roller Jam 0.0027 243,468.59 657.37
5. Water Tanker Jam 0.0060 231,231.73 1,387.39
6. Alat Bantu Ls 1.0000 500.00 500.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1
- Muat T1 0.45 menit
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 5.37 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 37.57 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0357 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0089 Jam
I. TENAGA
II. BAHAN
III. PERALATAN
1. Wheel Loader (E15) jam 0.0074 285,929.09 2,102.42
2. Dump Truck (E08) jam 0.6330 225,310.18 142,620.79
3. Motor Grader (E13) jam 0.0032 368,964.60 1,178.69
4. Tandem Roller (E17) jam 0.0040 218,992.84 879.49
5. Water Tanker (E23) jam 0.0141 231,231.73 3,250.25
6. Alat Bantu Ls 1.0000 8,500.00 8,500.00
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 KM
5 Tebal lapis agregat padat t 0.20 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10- 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
9 Berat volume agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
Faktor kehilangan - Sirtu Fh3 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 - lepas
Faktor Efisiensi alat Fa 0.80 - kondisi sedang
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45 menit panduan
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 136.00 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 952.00 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0515 jam
- Mandor = (Tk x M) : Qt - 0.0074 jam
I. TENAGA
II. BAHAN
III. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 340 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum Wcr 0.50 -
9 Perbandingan Camp. : Semen Sm 410.0 Kg/M3 Berdasarkan
: Pasir Ps 670.0 Kg/M3 JMF dari EE
: Agregat Kasar Kr 992.0 Kg/M3
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 422.300 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5412 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.2000 M3
1.e. Paku (M18) 1.6000 Kg
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.5 menit
Ts 3.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0000 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.1044 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 1,101,472.00 / M3
I. TENAGA
II. BAHAN
III. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a) 1.1000 Kg
1.b. Kawat beton (M14) 0.0025 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 14,015.00 / Kg
I. TENAGA
II. BAHAN
III. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum Ks 300 Kg/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 327.540 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5024 M3 653.1
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.9053 M3 1267.35
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.1000 M3
1.e. Paku (M18) 0.8000 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3 menit
Ts 17.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3655 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3655 jam
Rp. 915,699.0 / M3
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Material rangka baja di lokasi
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.00 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Berat Rangka Baja Span 60 M (Class B) Br 297.00 Kg
6 Untuk perletakan sementara : perancah kayu
7 Berat rangka baja per komponen Bg 1500 Kg rata-rata
1. BAHAN
Pipa
2. ALAT
2.a. Crane on Track 35 Ton (E31)
Kapasitas V2 1.00 batang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus
- Waktu penggeseran T1 20 menit
- Waktu Erection T2 30 menit
- Waktu lain-lain ( perkuatan rangka ) T3 10 menit
Ts1 60.00 menit
Lumpsum
3. TENAGA
Produksi Rangka baja (Prod. Crane menentukan) = Tk x Q1 Qt 8,715.0 kg/jam
Kebutuhan tenaga tambahan di lokasi :
- Pekerja P 1 orang
Koefisien Tenaga / Kg :
I. TENAGA
II. BAHAN
III. PERALATAN
Note :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga dan Peralatan, Volume dan/ ukuran berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaandari nomor mata
pembayaran. Harga satuan disampaikan Penyedia Jasa tdk dapat diubah kecuali terdapat penyesuaian harga (Eskalasi / Deskalasi)
sesuai ketentuan dalam Intruksi Kepada Peserta Lelang
3 Biaya Satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan Operator
4 Baya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak)
dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.3 (3) Analisa EI-733
JENIS PEKERJAAN :Baja Tulangan BJ 32 Ulir
SATUAN PEMBAYARAN : Kg URAIAN ANALISA TEKNIS HARGA SATUAN
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan L 23.00 KM
Jam kerja efektif per-hari Tk 7.00 jam
Faktor Kehilangan Besi Tulangan Fh 1.1 -
URUTAN KERJA
Besi tulangan dipotong dan dibengkokkan sesuai
dengan yang diperlukan
Batang tulangan dipasang / disusun sesuai dengan
Gambar Pelaksanaan dan persilangannya diikat kawat
BAHAN
Baja Tulangan (Ulir) D32 (M39b) 1.1000 Kg
Kawat beton (M14) 0.0200 Kg
ALAT
ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1 orang
- Tukang Tb 1 orang
- Pekerja P 3 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 27,640.00 / Kg
I. TENAGA
II. BAHAN
III. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 25 % Spec.
: - Volume Pasir Ps 75 % Spec.
7 Perbandingan Batu & Mortar :
- Batu Bt 65 %
- Mortar (campuran semen & pasir) Mr 35 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.30 ton/M3
- Semen Portland D5 1.44 ton/M3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.1700 M3 Lepas
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 (M12) 0.1225 M3
x {D5 x (1000)} (M12) 176.00 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.5088 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 5.00 menit
- Mengaduk T2 3.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 2 menit
Ts 12.00 menit
3. TENAGA
Produksi menetukan : Produksi Concrete Mxer Q1 2.075 M3/Jam
Produksi Pasangan Batu dengan Mortar / hari = Tk x Q1 Qt 14.53 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Batu Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4819 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.9639 jam
- Pekerja = (Tk x P) : Qt (L01) 3.8554 jam
Rp. 601,906.00 / M3
I. TENAGA
II. BAHAN
III. PERALATAN
Note :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga dan Peralatan, Volume dan/ ukuran berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaandari nomor mata
pembayaran. Harga satuan disampaikan Penyedia Jasa tdk dapat diubah kecuali terdapat penyesuaian harga (Eskalasi / Deskalasi)
sesuai ketentuan dalam Intruksi Kepada Peserta Lelang
3 Biaya Satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan Operator
4 Baya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak)
dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.11 (6) Analisa EI-7116
JENIS PEKERJAAN : Expansion Joint Tipe Baja Bersudut
SATUAN PEMBAYARAN : M1 URAIAN ANALISA TEKNIS HARGA SATUAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang flyover/ jembatan
3 Bahan / material diterima seluruhnya di lokasi
pekerjaan NAMA PENAWAR
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Expansion joint tipe baja bersudut t= 20 mm 1.000 M
2. ALAT
2.a. Cutter Machine
Memotong diperkirakan = 0.85 jam per m 0.85 jam
3. TENAGA
Produksi pasang Exp. Joint dalam 1 hari
= Tk x Q1 = Qt 12.00 m
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.5833 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.1667 jam
- Pekerja = (Tk x P) : Qt (L01) 2.9167 jam
Rp. 374,590 / M
I. TENAGA
II. BAHAN
III. PERALATAN
Note :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga dan Peralatan, Volume dan/ ukuran berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaandari nomor mata
pembayaran. Harga satuan disampaikan Penyedia Jasa tdk dapat diubah kecuali terdapat penyesuaian harga (Eskalasi / Deskalasi)
sesuai ketentuan dalam Intruksi Kepada Peserta Lelang
3 Biaya Satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan Operator
4 Baya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak)
dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.13.(1) Analisa EI-713
JENIS PEKERJAAN : Sandaran (Railing)
SATUAN PEMBAYARAN : M1 URAIAN ANALISA TEKNIS HARGA SATUAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jembatan
3 Bahan / material diterima seluruhnya di lokasi
pekerjaan NAMA PENAWAR
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Pipa d = 8.91 cm Galvanised (MXX) 1.000 M
2. ALAT
2.a. Alat pertukangan dan lain-lain
3. TENAGA
Produksi pasang Railingk dalam 1 hari
= Tk x Q1 = Qt 25.00 M
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.280 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.560 jam
- Pekerja = (Tk x P) : Qt (L01) 1.680 jam
Rp. 85,390 / M1
I. TENAGA
II. BAHAN
III. PERALATAN
1. Compressor E05 Jam 1.0417 165,719.57 172,624.56
2. Jack Hammer E26 Jam 1.0417 48,502.38 50,523.31
3. Wheel Loader E15 Jam 0.0101 285,929.09 2,896.67
4. Dump Truck E08 Jam 0.6098 225,310.18 137,393.26
5 Alat bantu Ls 1.0000 500.00 500.00
Note :
1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga dan Peralatan, Volume dan/ ukuran berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaandari nomor mata
pembayaran. Harga satuan disampaikan Penyedia Jasa tdk dapat diubah kecuali terdapat penyesuaian harga (Eskalasi / Deskalasi)
sesuai ketentuan dalam Intruksi Kepada Peserta Lelang
3 Biaya Satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan Operator
4 Baya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak)
dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.14 (2) Analisa EI-7152
JENIS PEKERJAAN : Pembongkaran Beton
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.0 Jam
5 Faktor pengembangan bahan Fk 1.24 -
6 Berat volume beton lepas D1 2.40 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER & COMPRESSOR (E05 & E26)
Kapasitas bongkar bk 50.00 Menit/M3 (padat)
Faktor efesiensi Fa 0.80
Kapasitas prod/jam = Fa x 60 Q1 0.960 M3
bk
Koefesien alat/M3 = 1 : Q1 1.0417 jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 0.96 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 6.72 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 12.5000 Jam
- Mandor = (Tk x M) : Qt (L03) 1.0417 Jam
Rp. 528,330.00 / M3
JADWAL PELAKSANAAN
HARGA SATUAN JUMLAH HARGA Bobot
No. URAIAN VOLUME SAT Bulan - I Bulan - II Bulan - III Bulan - IV
(Rp) (Rp) Rencana (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 DIVISI 1. UMUM
1 Galian Struktur dengan kedalaman 0 - 2 meter 45.54 M3 34,144.83 1,554,955.40 0.49 0.25 0.25
3 DIVISI 7. STRUKTUR
2 Beton Siklop fc’=15 MPa (K-175) 6.76 M3 915,699.00 6,190,125.24 1.96 0.98 0.98
3 Baja Tulangan BJ 24 Polos 609.10 Kg 14,015.00 8,536,536.50 2.70 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27
4 Baja Tulangan BJ 32 Ulir 5,437.99 Kg 27,640.00 150,306,043.60 47.62 4.76 4.76 4.76 4.76 4.76 4.76 4.76 4.76 4.76 4.76
5 Pasangan Batu 122.74 M3 601,906.00 73,877,942.44 23.41 3.34 3.34 3.34 3.34 3.34 3.34 3.34
6 Expansion Joint Tipe baja bersudut 32.00 M1 374,590.00 11,986,880.00 3.80 1.90 1.90
1 Pipa Untuk Pembuangan Air Dari Jembatan 4.20 M1 112,207.57 471,271.81 0.15 0.07 0.07
RENCANA KEMAJUAN PEKERJAAN MINGGUAN 2.45 8.10 6.01 5.03 5.03 5.03 5.03 5.03 8.38 16.08 16.08 3.34 3.34 3.77 5.07 2.21
RENCANA KEMAJUAN PEKERJAAN KUMULATIF 2.45 10.55 16.57 21.60 26.63 31.66 36.70 41.73 50.11 66.19 82.27 85.61 88.96 92.72 97.79 100.00
KET
JADWAL PENGGUNAAN PERALATAN UTAMA
1 DIVISI 1. UMUM
1 Mobilisasi 1.00 LS
2 DIVISI 3. PEKERJAAN TANAH
1 Galian Struktur dengan kedalaman 0 - 2 meter 45.54 M3
- Tidak Ada Bahan
2 Timbunan Biasa 20.05 M3
- Bahan Timbunan 24.06 M3
3 Timbunan Pilihan 16.00 M3
- Bahan Timbunan Pilihan 19.20 M3
3 DIVISI 7. STRUKTUR
1 Beton K250 32.85 M3
- Semen 13,872.56 Kg
- Pasir beton 17.78 M3
- Agregat Kasar 24.44 M3
- Kayu Perancah 6.57 M3
- Paku 52.56 Kg
2 Beton Siklop fc’=15 MPa (K-175) 6.76 M3
- Semen 2,214.17 Kg
- Pasir beton 3.40 M3
- Agregat Kasar 6.12 M3
- Kayu Perancah 0.68 M3
- Paku 5.41 Kg
3 Baja Tulangan BJ 24 Polos 609.10 Kg
- Baja Tulangan (Polos) U24 670.01 Kg
- Kawat Beton 1.52 Kg
4 Baja Tulangan BJ 32 Ulir 5,437.99 Kg
- Baja Tulangan (Ulir) D32 5,981.79 Kg
- Kawat Beton 108.76 Kg
5 Pasangan Batu 122.74 M3
- Batu Kali 143.61 M3
- Semen (PC) 21,602.24 Kg
- Pasir 62.46 M3
6 Expansion Joint Tipe baja bersudut 32.00 M1
- Expansion joint tipe baja bersudut t= 20 mm 32.00 M1
7 Sandaran Jembatan (Railing) 31.20 M1
- Pipa d = 8.91 cm Galvanised 31.20 M1
- Dudukan, mur, baut dll 23.40
4 DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
1 Pipa Untuk Pembuangan Air Dari Jembatan 4.20 M1
- Pipa 4.20 M1
Note : Pada jadwal penggunaan bahan hanya item pekerjaan yang mempunnyai bahan / material dalam Analisa Harga Satuan Pekerjaan yang dihitung
JADWAL PENGGUNAAN PERSONIL INTI DAN TENAGA KERJA
Pengalaman Kerja
Tempat, Tgl Lahir / Pendidikan Masa Kerja Di
No Jabatan Nama Alamat Sesuai Subbidang
Umur (Tahun) Terakhir Perusahaan (Tahun)
(Tahun)
Bayeun,
1 General Superintendent Iskandar Zulkarnaen, ST Kota Langsa S-I Teknik Sipil 2 14
31/12/1971
2 Bridge Engineer Yusrizal, ST Kota Banda Aceh Sigli, 01/12/1977 S-I Teknik Sipil 2 5
Medan,
3 Quantity Engineer Zulfikar Nur, ST Kota Banda Aceh S-I Teknik Sipil 2 13
25/07/1972
Padang Tiji,
4 Quality Engineer Irwan Syahputra, ST Aceh Besar S-I Teknik Sipil 2 10
10/03/1974
5 Pengawas Lapangan Dedi Saputra, ST Kota Banda Aceh Sigli, 11/04/1983 S-I Teknik Sipil 2 7
Milik Sendiri,
Tahun Ukuran Kapasitas / Kondisi
No Jenis Peralatan Kuantitas Merk Dan Model Akan Dibeli atau Lokasi Saat Ini
Pembuatan Daya (Baik / Rusak)
akan disewa
1 EXCAVATOR 80-140 HP 1 Unit Kobelco 1999 80 Hp Sewa Baik Bambi Kab. Pidie
2 MOTOR GRADER >100 HP 1 Unit Sakai 1999 100 Hp Sewa Baik Bambi Kab. Pidie
3 VIBRATORY ROLLER 5-8 T. 1 Unit Sakai 1999 5 Ton Sewa Baik Bambi Kab. Pidie
4 SURVEY EQUIPMENT 1 Unit Sokkia 2010 - Sewa Baik Bambi Kab. Pidie
5 DUMPTRUCK 2 Unit Mitsubishi 2005 4 M3 Sewa Baik Bambi Kab. Pidie
6 MOLEN BETON 2 Unit Tiger 1997 0,5 M3 Sewa Baik Bambi Kab. Pidie
STRUKTUR USULAN ORGANISASI LAPANGAN / PROYEK
General Superintendent
Iskandar Zulkarnaen, ST
1 EXCAVATOR 80-140 HP Kobelco 1999 80 Hp 1 Unit Baik Bambi Kab. Pidie Milik
2 MOTOR GRADER >100 HP Sakai 1999 100 Hp 1 Unit Baik Bambi Kab. Pidie Milik
3 VIBRATORY ROLLER 5-8 T. Sakai 1999 5 Ton 1 Unit Baik Bambi Kab. Pidie Milik
4 SURVEY EQUIPMENT Sokkia 2010 - 1 Unit Baik Bambi Kab. Pidie Milik
5 DUMPTRUCK Mitsubishi 2005 4 M3 2 Unit Baik Bambi Kab. Pidie Milik
6 MOLEN BETON Tiger 1997 0,5 M3 2 Unit Baik Bambi Kab. Pidie Milik
RUDI
Pimpinan Cabang
FORMULIR STANDAR UNTUK
I. TENAGA
II. BAHAN
III. PERALATAN
Muhammad Sabirin
Direktur
ITEM PEMBAYARAN NO. : 4.2.(2a) Analisa EI-422
JENIS PEKERJAAN : Lps. Pond. Ag. Kls. B
SATUAN PEMBAYARAN : M3 URAIAN ANALISA TEKNIS HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 KM
5 Tebal lapis Agregat padat t 0.20 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Lebar bahu jalan Lb 1.50 M
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
10 Berat volume agregat (lepas) Bil 1.51 ton/m3
- Agregat B Fh 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 - Pemuatan lepas
Faktor Efisiensi alat Fa 0.80 - sedang
Waktu siklus Ts1
- Memuat dan lain-lain T1 0.45 menit panduan
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 136.00 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 952.00 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0515 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0074 Jam
I. TENAGA
II. BAHAN
III. PERALATAN
Muhammad Sabirin
Direktur
ITEM PEMBAYARAN NO. : 6.1.(1a)
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair
SATUAN PEMBAYARAN : Liter URAIAN ANALISA TEKNIS HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As 64 % terhadap volume
- Kerosene K 36 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / liter
- Kerosene D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
0
II. URUTAN KERJA
1 Aspal dan Minyak Flux dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compressor
3 Campuran aspal cair disemprotkan dengan Asphalt
Distributor ke atas permukaan yang akan dilapis.
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Kecepatan penyemprotan V 30.00 m/menit Asumsi
Kapasitas pompa aspal pas 100.00 liter/menit Panduan
Faktor effisiensi kerja Fa 0.80 Sedang
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4 4,800.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 33,600.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
I. TENAGA
II. BAHAN
III. PERALATAN
1. Wheel Loader E15 Jam 0.0096 285,929.09 2,736.74
2. AMP E01 Jam 0.0201 6,677,536.91 134,087.09
3. Genset E12 Jam 0.0201 350,807.71 7,044.33
4. Dump Truck E08 Jam 0.5893 225,310.18 132,772.07
5. Asphalt Finisher E02 Jam 0.0110 316,153.50 3,474.80
6. Tandem Roller E17 Jam 0.0108 218,992.84 2,369.31
7 P. Tyre Roller E18 Jam 0.0046 283,363.34 1,315.36
8 Alat Bantu Ls 1.0000 500.00 500.00
Muhammad Sabirin
Direktur
ITEM PEMBAYARAN NO. : 6.3(6a) Analisa EI-636a
JENIS PEKERJAAN : Laston Lapis Antara (AC-BC) (gradasi halus/kasar)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA TEKNIS HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 KM
5 Tebal Lapis (AC) padat t 0.05 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 52.20 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 40.80 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.10 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat Isi bahan :
- AC-BC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D2 1.41 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
12 Jarak Stock file ke cold bin l 0.05 km
1. BAHAN
1.a. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D2 (M92) 0.3887 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91) 0.2729 M3
Aspal 52.5300 Kg
35.9600 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1 1.10 menit
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
Ts1 1.10 menit
3. TENAGA
Produksi menentukan : AMP Q2 49.80 ton
Produksi AC-BC / hari = Tk x Q5 Qt 348.60 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. TENAGA
II. BAHAN
III. PERALATAN
Muhammad Sabirin
Direktur
ITEM PEMBAYARAN NO. : 6.3.(8a) Analisa EI-638a
JENIS PEKERJAAN : Aspal Keras
SATUAN PEMBAYARAN : Ton URAIAN ANALISA TEKNIS HARGA SATUAN
I. ASUMSI
1. TENAGA
3. TENAGA
Produksi menentukan : AMP Q2 5 ton
Produksi AC-BC / hari = Tk x Q5 Qt 1 ton
Kebutuhan tenaga :
- Pekerja P 10 orang
- Mandor M 1 orang
2 BAHAN
2. ALAT
diperlukan :
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
- Tongkat Kontrol ketebalan hanparan
FORMULIR STANDAR UNTUK
I. TENAGA
II. BAHAN
III. PERALATAN
Muhammad Sabirin
Direktur
ITEM PEMBAYARAN NO. : 6.3 (10) Analisa EI-638a
JENIS PEKERJAAN : Bahan Pengisi (Filler) Tambahan
SATUAN PEMBAYARAN : Kg URAIAN ANALISA TEKNIS HARGA SATUAN
I. ASUMSI
1. BAHAN
1 Filler 1.0000 Kg
2. ALAT
ANALISA HARGA SATUAN PEKERJAAN
I. TENAGA
II. BAHAN
III. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.015 M Spec.10.4.3(2)(d)
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Thermoplastic = C x R x (BJ.Cat) (M17b) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Blass Bead (M34) 0.4500 Kg Spec.10.4.3(2)(e)
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 3.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Rp. 192,240.00 / M2
I. TENAGA
II. BAHAN
III. PERALATAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 20.0 Buah
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 110.4 menit
- Menurunkan = Rata-rata 1 menit / buah T3 20.0 menit
- Lain-lain = geser, atur, tunggu, dll. T4 10.0 menit
Ts 160.4 menit
3. TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1 Qt 43.47 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1610 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.6442 jam
- Pekerja = (Tk x P) : Qt (L01) 1.2884 jam
I. TENAGA
II. BAHAN
III. PERALATAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (kerb pemisah jalan)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 100.00 Kg/M3
2. ALAT
2.a. DUMP TRUK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 110.40 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 155.4 menit
3. TENAGA
Produksi pasang kerb pemisah jalan / hari = Tk x Q1 Qt 27.03 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2590 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.5180 jam
- Pekerja = (Tk x P) : Qt (L01) 2.0720 jam
I. PEKERJA
II. BAHAN
III. PERALATAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar rel pengaman diterima di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.0 Km ukuran
5 Jam kerja efektif per-hari Tk 7.00 jam sesuai
6 Faktor kehilangan bahan Fh 1.00 - drawing
7 Tulangan praktis Rc 50.00 Kg/Cu.m
2. ALAT
2,a DUMP TRUCK (E08) (E08)
Kapasitas 1 kali Angkut Cp 15.0 M'
Waktu Siklus : Ts
- Memuat T1 50.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 110.40 menit
- Menurunkan T3 60.0 menit
- Lain-lain T4 30.0 menit
Ts 250.4 menit
3. TENAGA
Produksi pasang pagar pengaman / hari = Tk x Q1 Qt 25.16 M'
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M' :
- Mandor = (Tk x M) : Qt (L03) 0.2782 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.5564 jam
- Pekerja = (Tk x P) : Qt (L01) 2.2258 jam
I. TENAGA
II. BAHAN
III. PERALATAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar mata kucing diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
3. TENAGA
Produksi pasang mata kucing/ hari = Tk x Q1 Qt 5.00 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 2.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 1.4000 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.4000 jam
- Pekerja = (Tk x P) : Qt (L01) 2.8000 jam
Rp. 4,095.00 / M2
A. TENAGA
B. BAHAN
1 Tiang lampu type tunggal, Lighting Pol buah 1.00 12,000,000.00 12,000,000.00
2 Lampu PLTS buah 1.00 7,000,000.00 7,000,000.00
3 Kabel type m1 15.00 7,840.00 117,600.00
4 Beton K 250 M3 0.72 0.00 0.00
5 Reinforcing Steel deform = 56 x 1.05 Kg 58.80 14,562.50 856,275.00
6 MCB,1P, 16 A buah 1.00 36,400.00 36,400.00
7 Plat besi = 0.009x0.4x0.4x7850 M3 0.72 18,750.00 13,500.00
8 Copper Rod = 22/7 x(0.007)^2 x 1 x 78 Kg 1.21 4,480.00 5,420.80
9 Pipa PVC dia 3" M3 15.00 40,464.00 606,960.00
10 Bekisting buah 1.00 1,000,000.00 1,000,000.00
C. PERALATAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 110.40 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 155.4 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 27.03 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2590 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.5180 jam
- Pekerja = (Tk x P) : Qt (L01) 2.0720 jam
27 S 41
4 9
R 27 14 41
10
10 C 17
2 3
10 7 17
10
B O 20 P 24 Q 27
8 10 11
5 20 4 24 3 27
0 A 6
0 1
0 6 6 150
19
150
D 23 G 26
6 12
13 E 23 3 26
4 69 8 L
17
19 69
5
19
K
F 7 75
18
Lintasan Kritis 9 28 H 42 I 53 J 62 142
7 13 14 15
Dummy 28 14 42 11 53 9 62
7 N
M
6
69
16
Uraian Pekerjaan Waktu 136
DIVISI 1. UMUM
A Mobilisasi 6 Hari
#NAME?
B #NAME? 5 Hari
C #NAME? 7 Hari
DIVISI 3. PEKERJAAN TANAH
D #NAME? 13 Hari
E Galian Struktur dengan kedalaman 0 - 2 meter 4 Hari
F #NAME? 9 Hari
G Timbunan Biasa 3 Hari
#NAME?
H #NAME? 14 Hari
#NAME?
I #NAME? 11 Hari
J #NAME? 9 Hari
#NAME?
K #NAME? 7 Hari
L #NAME? 8 Hari
M #NAME? 7 Hari ###
N #NAME? 6 Hari ###
DIVISI 7. STRUKTUR
O Beton K250 10 Hari
P #NAME? 4 Hari
Q #NAME? 3 Hari
R #NAME? 10 Hari ###
S #NAME? 14 Hari ###
150
HARGA & JARAK RATA-RATA
DARI SUMBER BAHAN (QUARRY)
HARGA JARAK
No. URAIAN SATUAN ROYALTY QUARRY KET.
(Rp) ( Km )
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3 43,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 306,503.08
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 389,144.83
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.5 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi : Quarry
Tujuan : Base Camp
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 20.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3 45,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 306,503.08
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 389,144.83
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.5 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M02 - Batu Kali
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 30.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3 40,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 306,503.08
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 389,144.83
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam 285,929.09
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam 8,571.43
9 Berat volume batu belah Bil 1.60 ton/m3
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M06 - Batu Belah
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 4,626.80 Rupiah
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 8.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3 34,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 306,503.08
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 389,144.83
7 Berat volume sirtu Bil 1.51 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.5 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M16 - Sirtu
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 5.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 30,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 306,503.08
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 389,144.83
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.5 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M44 - Pasir Urug
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 10.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 40,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 306,503.08
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 389,144.83
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M1c- Pasir Beton
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA JUMLAH
No ELEMEN BIAYA SATUAN BIAYA
Rp. Rp.
1,250.00
ANALISA HARGA MATERIAL ON SITE
HARGA JUMLAH
No ELEMEN BIAYA SATUAN BIAYA
Rp. Rp.
11,000.00
ANALISA HARGA MATERIAL ON SITE
HARGA JUMLAH
No ELEMEN BIAYA SATUAN BIAYA
Rp. Rp.
173,700.00
ANALISA HARGA MATERIAL ON SITE
HARGA JUMLAH
No ELEMEN BIAYA SATUAN BIAYA
Rp. Rp.
11,000.00
LAMPIRAN 11 PENAWARAN
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3.5 TON E08
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 3.5 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 160,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 0.05 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 5,000.00 Liter
5. Bahan Bakar Solar Ms 10,400.00 Liter
6. Minyak Pelumas Mp 15,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 10 TON E09
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 250,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 0.05 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 5,000.00 Liter
5. Bahan Bakar Solar Ms 10,400.00 Liter
6. Minyak Pelumas Mp 15,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 3-4 M3 E11
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 10.0 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 198,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 0.05 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 5,000.00 Liter
5. Bahan Bakar Solar Ms 10,400.00 Liter
6. Minyak Pelumas Mp 15,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER >100 HP E13
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp 10,800.0 -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 600,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 0.05 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 5,000.00 Liter
5. Bahan Bakar Solar Ms 10,400.00 Liter
6. Minyak Pelumas Mp 15,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. E19
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 7.050 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 400,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 40,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 0.05 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 5,000.00 Liter
5. Bahan Bakar Solar Ms 10,400.00 Liter
6. Minyak Pelumas Mp 15,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E23
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 190,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 0.05 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 5,000.00 Liter
5. Bahan Bakar Solar Ms 10,400.00 Liter
6. Minyak Pelumas Mp 15,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E06
2. Tenaga Pw 20.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 36,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 0.05 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 5,000.00 Liter
5. Bahan Bakar Solar Ms 10,400.00 Liter
6. Minyak Pelumas Mp 15,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
DAFTAR HARGA DASAR SATUAN ALAT
HARGA SEWA
No. URAIAN HP HP KAP SATUAN ALAT / JAM KET.
(Rp)
###
B. BIAYA PASTI PER JAM KERJA E
1. Nilai Sisa Alat = 10 % x B C 24,500,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.20030 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 22,083.09 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 245.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 22,328.09 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA > 15th ?
Kondisi Alat
1. Bahan Bakar = (12%-15%) x Pw x Ms H 143,520.00 Rupiah Nilai B' dari
Depresiasi
E. LAIN - LAIN
1. Tingkat Suku Bunga i 0.05 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,285.71 Rp./Jam
4. Bahan Bakar Bensin Mb 5,000.00 Liter
5. Bahan Bakar Solar Ms 10,400.00 Liter
6. Minyak Pelumas Mp 15,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I ASUMSI
1 Bahan dasar (Batu dan Pasir) diterima di lokasi Alat
Pemecah Batu (di Base Camp)
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Hasil produksi Alat Pemecah Batu : - Agregat Halus H 30.00 %
- Agregat Kasar K 70.00 %
4 Berat Isi Bahan : - Batu / Gravel D1 1.40 Ton/M3 Berongga
- Pasir D2 1.40 Ton/M3 Berongga
- Batu Pecah D3 1.30 Ton/M3 Berongga
5 Harga Satuan Bahan Dasar : - Batu Kali Rp1 128,300.00 Rp./M3
- Pasir Rp2 173,700.00 Rp./M3
6 Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) Rp3 935,713.91 Rp./Jam
- Wheel Loader Rp4 285,929.09 Rp./Jam
7 Kapasitas Alat : - Pemecah Batu (Stone Crusher) Cp1 50.00 Ton/Jam
- Pemecah Batu (Stone Crusher) Cp2 1.50 M3 Kap. Bucket
8 Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) Fa1 0.70 -
- Wheel Loader Fa2 0.70 -
9 Faktor Kehilangan Material Fh 0.95 -
10 Agregat Halus masih perlu dicampur dengan pasir
II METHODE PELAKSANAAN
III PERHITUNGAN
Berlanjut
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan 1
Satuan Harga
No. Uraian Pekerjaan Kuantitas
Ukuran Satuan
Total Daftar 1
(Pindahkan nilai total ke Daftar Rekapitulasi)
Total
Harga
Rp 13,925,000
Rp 13,925,000
Daftar 3 : Mata Pembayaran Lainnya¹
Total Daftar 3 Rp -
(Pindahkan nilai total ke Daftar Rekapitulasi)
Daftar Rekapitulasi MPU
Mata Pembayaran
---dll.---
PPN 10%
TOTAL NILAI
MPU
Harga
13,925,000.00
46,835,347.15
0.00
60,760,347.15
6,076,034.72
66,836,381.87
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0222 285,929.09 6,353.98
2. Blending Equpment (E52) jam 0.0430 173,869.70 7,481.48
3 Alat Bantu Ls 1.0000 500.00 500.00
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 % memenuhi Spec.
- Pasir Urug PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.50 ton/m3
10 Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh3 1.05
Tujuh ratus empat puluh juta tiga ratus enam puluh satu ribu rupiah
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
- Agr 20-30 = "20-30" x 1 M3 x Fh1 M93 0.2940 M3
- Agr 5 - 10 & 10 - 20 = "5-10 & 10-20" x 1 M3 x Fh2 M92 0.4410 M3
- Pasir Urug = PU x 1 M3 x Fh3 M44 0.3150 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 1.00 - kondisi sedang
Faktor Efisiensi alat Fa 1.00 -
Waktu Siklus :
- Waktu pemuatan alat blending T1 2.00 menit jarak 50 meter
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 45.00 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 315.00 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0444 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0222 Jam
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0315 285,929.09 9,006.35
2. Blending Equpment (E52) jam 0.0482 173,869.70 8,379.26
3 Alat Bantu Ls 1.0000 500.00 500.00
I ASUMSI
1 Bahan Agregat Halus & Kasar diterima di lokasi
Base Camp
2 Jarak dari stockpile ke alat blending l 50.00 M
3 Jam kerja effektif perhari Tk 7.00 jam
4 Kegiatan dilakukan di dalam lokasi Base Camp
5 Berat isi padat Bip 1.81
6 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 m 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
9 Berat volume agregat (lepas) Bil 1.51 ton/m3
- Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
- Agregat Pecah Mesin 5 - 10 & 10 - 20 m Fh2 1.05
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh3 1.05
II URUTAN PEKERJAAN
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Waktu pemuatan alat belending T1 2.00 menit jarak 50 meter
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 31.75 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 222.23 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0630 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0315 Jam
DAFTAR BARANG YANG DIIMPOR
TOTAL HARGA
DAFTAR LAMPIRAN-LAMPIRAN PENAWARAN
Nama Penawar : CV. Arhindo Utama
Kode Paket : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
Nama Paket
NO URAIAN
3 Rekapitulasi Rencana Anggaran Biaya atau Rekapitulasi Daftar Kuantitas dan Harga
9 Daftar Harga Upah, Daftar Harga Bahan dan Daftar Harga Sewa Peralatan
10 Metode Pelaksanaan
11 Network Planning (Rencana Jaring Kerja) untuk paket pekerjaan kualifikasi Non Kecil (NK)
19 Sertifikat Keahlian (SKA) bagi Tenaga Ahli/Personil Inti General Superintendent (GS)
29 Surat Pernyataan Kinerja Baik dan Tidak Masuk Daftar Hitam Rekanan
40 Akta Perusahaan
AN
TANDA
PERIKSA
√
√
√
Analisa EI-1011
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
#NAME?
###
###
###
###
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI
(TKDN)
Formulasi perhitungan :
% TKDN (Gabungan Barang dan Jasa) = Nilai Barang Total (3C) - Nilai Barang Luar Negeri (3B)
Nilai Gabungan Barang dan Jasa (9C)
Muhammad Sabirin
Direktur
LAMPIRAN 11 PENAWARAN
JADWAL BAHAN
No NAMA BAHAN SATUAN Bulan - I Bulan - II Bulan - III Bulan - IV Bula
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1
1 Pasir M3
2 Batu Kali M3
3 Bahan Tanah timbun M3
4 Bahan Timbunan Pilihan M3
5 Semen PC (40 Kg) Kg
6 Aspal Kg
7 Agregat Kasar M3
8 Agregat Halus M3
RAN 11 PENAWARAN
PENGGUNAAN BAHAN
JADWAL BAHAN
Bulan - V Bulan - VI KET
2 3 4 1 2 3 4
###
###
###
###
LAMPIRAN 10 PENAWARAN
JADWAL ALAT
JUMLAH
No NAMA ALAT Bulan - I Bulan - II Bulan - III Bulan - IV Bulan - V
PERALATAN
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
NGGUNAAN PERALATAN
JADWAL ALAT
Bulan - V Bulan - VI KET
3 4 1 2 3 4
###
###
###
###
LAMPIRAN 12 PENAWARAN
JADWAL PERSONIL
JUMLAH
No URAIAN Bulan - I Bulan - II Bulan - III Bulan - IV Bu
PERSONIL
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1
1 General Suprintendent 1
2 Highway Engineer 1
3 Material Engineer 1
4 Quality Engineer 1
5 Quantity Engineer 1
6 Juru Gambar 1
7 Juru Ukur 1
8 Adm 1
9 Pekerja 18
10 Tukang 6
11 Mandor 1
12 Operator 9
13 Pembantu Operator 4
14 Sopir / Driver 4
15 Pembantu Sopir / Driver 4
16 Mekanik 2
17 Pembantu Mekanik 2
18 Kepala Tukang 2
###
###
###
###
AN 12 PENAWARAN
JADWAL PERSONIL
Bulan - V Bulan - VI KET
2 3 4 1 2 3 4
Formulir Penentuan Harga Bahan
Bahan : Semen
2 Handling - - -
Bahan : Aspal
I ASUMSI
1 Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Proporsi campuran : - Agregat Kasar Ak 32.50 %
- Pasir Ps 67.50 %
II METHODE PELAKSANAAN
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Pek. ini tdk. termasuk Bitumen Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal LASBUTAG t 3.00 Cm
9 Lasbutag terdiri dari (spesifikasi) :
- Agregat Kasar CA 30.00 % Total Campuran
- Pasir Ps 49.50 % Total Campuran
- Asbuton Asb 16.00 % Total Campuran
- Peremaja, terdiri atas : Md 4.50 % Total Campuran
- Bunker Oil (BO) Bo 47.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 15.00 % Total Modifier
- Bahan Anti Stripping (jarang digunakan) As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Lasbutag D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
3. TENAGA
Produksi menentukan : ASPHALT FINISHER Q5 3,213.00 M2
Produksi / hari = Tk x Q5 Qt 22,491.00 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0062 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 1.50 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar (umumnya tidak digunakan) CA 0.00 % Total Campuran
- Pasir Ps 73.00 % Total Campuran
- Asbuton Asb 21.00 % Total Campuran
- Peremaja, terdiri atas : Md 6.00 % Total Campuran
- Bunker Oil (BO) Bo 44.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 18.00 % Total Modifier
- Bahan Anti Stripping As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.85 -
Waktu Siklus : Ts1 0.45 menit lihat tabel
V - loading
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Asphal Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 2.00 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar CA 14.00 % Total Campuran
- Pasir Ps 63.00 % Total Campuran
- Asbuton Asb 18.00 % Total Campuran
- Peremaja, terdiri atas : Md 5.00 % Total Campuran
- Bunker Oil (BO) Bo 44.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 18.00 % Total Modifier
- Bahan Anti Stripping As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1 0.45 menit lihat tabel
V - loading
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1. BAHAN
2 ALAT
3. TENAGA
I. ASUMSI
1 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 Km
2 Jam kerja efektif per-hari Tk 7.00 Jam
3 Kandungan Bitumen dalam Bunker Oil (BO) Bbo 80.00 %
4 Kandungan Bitumen dalam Aspal Semen Bas 100.00 %
5 Kandungan Bitumen dalam Kerosene Bk 0.00 %
6 Proporsi Peremaja (modifier Lasbutag) :
- Bunker Oil (BO) Bo 47.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 15.00 % Total Modifier
- Bahan Anti Stripping (umumnya tidak digunakan) As 0.00 % Total Modifier
7 Berat Isi bahan : - Modifier D1 0.99 T/m3
- Bunker Oil (BO) D2 0.97 T/m3
- Aspal Semen D3 1.03 T/m3
- Minyak Tanah D4 0.80 T/m3
8 Penyiapan Peremaja dilaksanakan di Base Camp
1. BAHAN
1.a Bunker Oil (BO) = (1000:Bit) x Bp1 x 1.01 : D2 (M54) 647.3300 Liter
1.b Aspal Semen = (1000:Bit) x Bp2 x 1.01 (M10) 507.6720 Kg
1.c Minyak Tanah = (1000:Bit) x Bp3 x 1.01 : D3 (M11) 250.4960 Liter
2 ALAT
3. TENAGA
Produksi menentukan : Liquid Asphalt Mixer Q1 1.26 Ton
Produksi / hari = Tk x Q1 Qt 8.85 Ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
0
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 6.4 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Lasbutag TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
0
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 6.4 (2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Latasbusir Kelas A TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
1. Pasir (M01) M3 0.0137 173,700.00 2,382.80
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
0
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 6.4 (3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Latasbusir Kelas B TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
0
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 6.4 (4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Bitumen Asbuton TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA PERALATAN 0.00
Analisa EI-645
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
0
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 6.4 (5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Bitumen Bahan Peremaja TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 2.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 6.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 2.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.0 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Banyak Galian pada Caison / M' Vt 4.91 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 5.66 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 194.52 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal Lapis perkerasan beton padat t 0.30 m
7 Kadar Semen Minimum (Spesifikasi) Ks 365 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
10 Perbandingan Camp. : Semen Sm 400.0 % Berdasarkan
: Pasir Ps 791.0 % JMF & sesuai
: Agregat Kasar Kr 1,077.0 % dgn Spesifikasi
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7028 jam
- Pekerja = (Tk x P) : Qt (L01) 1.4056 jam
Rp. 0.00 / M2
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 7.7 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-775
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 7.7 (5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 5.3.1 PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Perkerasan Jalan Beton TOTAL HARGA (Rp.) : -
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
1. Pekerja (L01) jam 1.4056 8,571.43 12,048.19
2. Tukang (L02) jam 0.7028 8,571.43 6,024.10
3. Mandor (L03) jam 0.1506 8,857.14 1,333.91
B. BAHAN
1. Semen (M12) Kg 410.0000 1,250.00 512,500.00
2 Pasir (M01a) M3 0.6237 141,900.00 88,499.21
3 Agregat Kasar (M03) M3 0.7885 156,362.77 123,294.83
4 Baja Tulangan Polos (M39a) Kg 15.8750 11,000.00 174,625.00
5 Joint Sealent (M94) Kg 0.9900 34,100.00 33,759.00
6 Cat Anti Karat (M95) Kg 0.0200 35,750.00 715.00
7 Expansion Cap (M96) M2 0.1700 6,050.00 1,028.50
8 Polytene 125 mikron (M97) Kg 0.4375 19,250.00 8,421.88
9 Curing Compound (M98) Ltr 0.8700 38,500.00 33,495.00
10 Multiplex 12 mm (M73) Lbr 0.1600 181,500.00 29,040.00
11 Kayu Acuan (M99) M3 0.0960 1,000,000.00 96,000.00
12 Paku (M18) Kg 1.0240 13,500.00 13,824.00
13 Additive (M67a) Ltr 0.9139 38,500.00 35,185.92
JUMLAH HARGA BAHAN 1,150,388.34
C. PERALATAN
1 Wheel Loader E15 jam 0.0244 285,929.09 6,979.92
2 Batching Plant E43 jam 0.0502 329,340.02 16,533.13
3 Truck Mixer E49 jam 0.5304 436,847.91 231,687.71
4 Con. Vibrator E20 jam 0.0502 50,849.64 2,552.69
5 Water Tank Truck E23 jam 0.0422 231,231.73 9,750.74
6 Conc. Paver E42 jam 0.0074 230,415.02 1,713.63
7 Alat Bantu Ls 1.0000 0.00 0.00
8
0.025
ITEM PEMBAYARAN NO. : 8.1 (1)
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk Pek. Minor
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.0 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 %
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 %
- Pasir Urug PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh 1.05
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) ### M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45 menit
TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 25.00 orang
- Mandor M 1.00 orang
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1772 jam
- Mandor = (Tk x M) : Qt (L03) 0.0071 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.0 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 %
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 %
- Sirtu St 64.00 %
9 Berat volume agregat (lepas) Bil 1.51
- Agregat B Fh 1.05
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1063 jam
- Mandor = (Tk x M) : Qt (L03) 0.0071 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.0 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Muat T1 0.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3 / Jam
Produksi Agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1274 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.0 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Faktor kehilangan material Agregat Fh 1.10 -
7 Komposisi campuran (taksiran) :
- Agregat Kasar Ak 85.00 %
- Agregat Halus Ah 15.00 %
8 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
9 Berat isi padat Bip 1.81
10 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Menunggu, dan lain lain T1 0.45 menit
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1631 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0102 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.0 KM
5 Tebal Lapis Hotmix padat untuk patching t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran ATB :
- Coarse Agregat CA 55.00 %
- Fine Agregat FA 37.50 %
- Fraksi Filler FF 1.00 %
- Asphalt minimum 6 % As 6.50 %
9 Berat jenis bahan :
- ATB D1 2.30 ton / M3
- Coarse Agregat & Fine Agregat D2 1.80 ton / M3
- Fraksi Filler D3 2.00 ton / M3
- Asphalt D4 1.03 ton / M3
10 Jarak stock pile ke cold bin l 100.00 m
11 Faktor kembang Fk 1.20
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju (ke bin) Vf 15.00 km/jam
Kecepatan kembali (ke stock pile) Vr 20.00 km/jam
Waktu Siklus Ts1
- Muat = l x 60 + l x 60 T1 0.70 menit
- Lain lain 1000 x Vf 1000 x Vr T2 0.75 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : AMP Q6 18.04 M3 / Jam
Produksi ATB / hari = Tk x Q6 Qt 126.30 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 1.1084 Jam
- Mandor = (Tk x M) / Qt (L03) 0.1108 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2
- Agregat Pengunci Ap 25.00 Kg/M2
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2
As2 94.55 Kg/M3
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.0 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM
- Kadar Aspal terhadap berat total campuran As 7.00 %
- Tebal nominal padat untuk patching t 0.04 M
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01 Ton/M3
- Aspal (diambil) D2 1.00 Ton/M3
- Agregat (diambil) D3 1.60 Ton/M3
7 Faktor kembang campuran Fk 1.20
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1683 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 140.700 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : Ts1
- Memuat T1 0.50 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.30 menit
- Tunggu, dll. T4 0.20 menit
Ts1 2.00 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 10.375 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 72.63 M3
Kebutuhan tenaga : - Mandor M 2.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1928 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1566 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.0 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 %
- Minyak Fluk / Pencair K 13.00 %
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Minyak Tanah (Kerosene) D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 850.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Kapasitas pompa aspal pas 55.00 liter/menit
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 3,012.90 liter
Produksi / hari = Tk x Q1 Qt 21,090.30 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 2.00 menit
Ts2 47.00 menit
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000 jam
- Mandor = (Tk x M) : Qt (L03) 0.1000 jam
Rp. 87,969.27 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang/baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor pengembangan bahan Fk 1.20 -
7 Tebal hamparan padat t 0.15 M
8 Hasil bongkaran per M2 luas area d 0.50 ton
1. BAHAN
1a Bahan timbunan = 1 x Fk (M08) 1.20 M3
2. ALAT
2.a DUMP TRUCK (E09)
Kapasitas bak V 10.00 ton
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/jam
Kecepatan rata-rata kosong v2 30.00 KM/jam
Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 menit T1 69.00 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 46.00 menit
- Lain-lain (termasuk dumping setempat-setempat) T3 2.00 menit
Ts2 117.00 menit
Kap. Prod. / jam = V x Fa x 60 Q2 8.51 M2
Ts2 x d
Koefisien Alat / M3 = 1 : Q2 (E09) 0.1175 jam
TENAGA
Produksi pembersihan dan pembongkaran/hari Qt 500.00 M2
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Mandor M 1.00 orang
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0700 jam
- Mandor = (Tk x M) : Qt (L03) 0.0140 jam
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 30-50 cm setara dengan volume Vp 3.00 M3
6 Berat Jenis Kayu BjK 0.90 ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 TON
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10.00 menit
Ts 55.00
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 50 - 75 cm setara dengan volume Vp 5.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10.00 menit
Ts2 55.00
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 3.5000 jam
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter > 75 cm setara dengan volume Vp 10.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 15.00 menit
Ts 60.00 menit
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 4.6667 jam
- Mandor = (Tk x M) : Qt (L03) 0.4667 jam
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (gebalan rumput) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
1. BAHAN
1.a. Gebalan Rumput = 1 M2 x Fh (M32) 1.1000 M2
2. ALAT
2.a. ALAT BANTU
- Gerobak Dorong = 2 buah
- Tusuk Bambu = 5 buah / M2
- Pagar Tali = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 4.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1400 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2800 jam
Rp. 46,992.00 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar (semak/perdu) diterima seluruhnya di lokasi pekerjaan
1. BAHAN
1.a. - Semak/perdu (M32) 1.10 M2
1.b. - Tanah humus setebal 20 cm mxx 0.22 m3
1.c. - Pupuk mxx 0.25 kg
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 0.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0000 jam
- Pekerja = (Tk x P) : Qt (L01) 0.4200 jam
Rp. 46,992.00 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar pohon dan bahan lainnya diterima di lokasi pekerjaan
4 ukuran lubang 0,5 x 0,5 x 0,5 m
1. BAHAN
1.a. - pohon (M32) 1.00 bh
1.b. - Tanah humus setebal 20 cm mxx 0.22 m3
1.c. - Pupuk mxx 0.50 kg
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 0.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0000 jam
- Pekerja = (Tk x P) : Qt (L01) 0.4200 jam
Rp. 43,142.00 / bh
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fk 1.10 -
6 Tebal plat jembatan 0.20 cm
1. BAHAN
- Beton K300 0.22 m3
- Baja tulangan (bila diperlukan) kg
2. ALAT
2.a. COMPRESSOR, JACK HAMMER & LOADER
Produksi per jam Q1 7.50 M3 / Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 7.50 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 52.50 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.6000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1333 Jam
Rp. 89,740.25 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fk 1.10 -
6 Tebal Lantai Jembatan Kayu 0.10 cm
1. BAHAN
- Kayu Klas I untuk 1 m2. 0.10 m3
- Paku dan material lainnya 0.20 kg
2. ALAT
3. TENAGA
Produksi menentukan : Q1 1.00 M2/Jam
Produksi Penggembalian kondisi / hari = Tk x Q1 Qt 7.00 M2/Hari
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 4.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 1.0000 Jam
Rp. 352,927.14 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fk 1.10 -
6 Pelapisan permukaan dengan cat anti karat 0.10 cm
1. BAHAN
- Cat anti karat per meter persegi 0.60 kg
- Ampelas dan material lainnya 2.00 Lb
2. ALAT
3. TENAGA
Produksi menentukan : Q1 0.75 M2/Jam
Produksi Penggembalian kondisi / hari = Tk x Q1 Qt 5.25 M2/Hari
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 0.50 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.6667 Jam
- Mandor = (Tk x M) : Qt (L03) 0.6667 Jam
Rp. 55,233.10 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : ............ bulan
KETERANGAN
Gradasi harus
memenuhi Spec.
panduan
KETERANGAN
Lump Sum
Analisa EI-812
Gradasi harus
memenuhi
Spesifikasi
Berlanjut ke halaman berikut
Analisa EI-812
KETERANGAN
Lump Sum
Analisa EI-813
KETERANGAN
Agregat lepas
KETERANGAN
Lump Sum
Analisa EI-814
KETERANGAN
Berlanjut ke halaman berikut
Analisa EI-814
KETERANGAN
Lump Sum
Analisa EI-815
KETERANGAN
Rata-rata
Gradasi harus -
memenuhi -
Spesifikasi
KETERANGAN
Lump Sum
Berlanjut ke halaman berikut
Analisa EI-815
KETERANGAN
Analisa EI-817
KETERANGAN
(As1 : t)
Berlanjut ke halaman berikut
Analisa EI-817
KETERANGAN
Lump Sum
KETERANGAN
Analisa EI-818
KETERANGAN
Rata-rata
diambil
Berlanjut ke halaman berikut
Analisa EI-818
KETERANGAN
Melayani 1 buah
molen
Analisa EI-819
KETERANGAN
100 bagian
15 bagian
campuran
KETERANGAN
Analisa EI-821
KETERANGAN
Lump Sum
KETERANGAN
Analisa EI-822
KETERANGAN
Borrow Pit
Lump Sum
asumsi
KETERANGAN
Analisa EI-821
KETERANGAN
Buah / Jam
Lump Sum
KETERANGAN
Analisa EI-821
KETERANGAN
Buah / Jam
Lump Sum
KETERANGAN
Analisa EI-825
KETERANGAN
Lump Sum
Berlanjut ke halaman berikut
Analisa EI-821
KETERANGAN
Analisa LI-831
KETERANGAN
Analisa LI-832
KETERANGAN
Analisa LI-833
KETERANGAN
Analisa EI-851
KETERANGAN
(E05/26/10/15)
Lump Sump
Analisa EI-851
KETERANGAN
Lump Sump
Analisa EI-851
KETERANGAN
Lump Sump
Analisa EI-811
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
MATA PEMBAYARAN NO. : 8.1 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk - TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 Pek. Minor % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
MATA PEMBAYARAN NO. : 8.1 (2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk - TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 Pek. Minor % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.1 (3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup AspTOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.1 (4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Waterbound Macadam Utk. Pek. - TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 Minor % THD. BIAYA PROYEK : 0.00
A. TENAGA
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.1 (5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Minor TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
1. Pekerja Biasa (L01) Jam 1.1084 8,571.43 9,500.86
2. Mandor (L03) Jam 0.1108 8,857.14 981.76
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0301 285,929.09 8,619.08
2. AMP E01 Jam 0.0554 6,677,536.91 370,080.36
3. Genset E12 Jam 0.0554 350,807.71 19,442.35
4. Dump Truck E09 Jam 0.8313 389,144.83 323,505.95
5. Pedestrian Roller E24 Jam 0.1975 156,392.98 30,889.39
6. Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.1 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Minor TOTAL HARGA : 0.00
SATUAN PEMBAYARAN : M3 (Perata) % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.1 (8) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Minor TOTAL HARGA : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.1 (9) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Residu Bitumen Untuk Pek.Minor TOTAL HARGA : 0.00
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.2 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian untuk Bahu Jalan & Pek. Minor Lain TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
MATA PEMBAYARAN NO. : 8.2 (2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pembersihan dan Pembongkaran Tanaman TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 (diameter < 30 cm) % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.2 (3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penebangan Pohon, diameter 30 - 50 CM TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.2 (4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penebangan Pohon, diameter 50 - 75 CM TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.2 (5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penebangan Pohon, diameter > 75 CM TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.3.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Stabilisasi Dengan Tanaman TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.3.(2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Semak/perdu TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa LI-833
PROYEK :
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.3.(3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pohon TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-851
PROYEK
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.5.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pengembalian kondisi lantai jembatan beton TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor E05 Jam 0.1333 165,719.57 22,095.94
2. Jack Hammer E26 Jam 0.1333 48,502.38 6,466.98
3. Wheel Loader E15 Jam 0.1333 285,929.09 38,123.88
4. Alat bantu Ls 1.0000 0.00 0.00
PROYEK
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.5.(2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pengembalian kondisi lantai jembatan kayu TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : Pembangunan Jalan Dinas Bina Marga Dan Cipta Karya Kabupaten Pidie
NAMA PAKET : Rehabilitasi Jembatan Blang Rimeh Pulo Seunong (4 x 8 m) di Kec. Tangse
PROP / KAB / KODYA : Aceh / Pidie
ITEM PEMBAYARAN NO. : 8.5.(3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pengembalian kondisi pelapisan permukaan baja strTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.0 KM
5 Tebal lapis agregat padat t 0.15 M
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Berat isi padat Bip 1.81 ton/m3
8 Berat volume agregat (lepas) Bil 1.51 ton/m3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Mencampur T1 1.00 menit
- Memuat dan lain-lain T2 0.45 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 76.81 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 537.66 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1953 jam
- Mandor = (Tk x M) : Qt (L03) 0.0130 jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.A Analisa EI-10A
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.0 KM
5 Tebal Lapis Hotmix padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi padat Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.40 %
11 Berat Isi bahan :
- AC-WC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
11 Jarak Stock pile ke Cold Bin l 50.00 m
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10 & 10-15" x (D1 x tM3) x Fh1) : D2 (M92) 0.0307 M3
1.b. Agr 0-5 = ("0-5" x (D1 x tM3) x Fh1) : D3 (M91) 0.0298 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 1.8514 Kg
1.d. Aspal = (AS x (D1 x tM3) x Fh2) x 1000 (M10) 5.1615 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju Vf 15.00 km/jam
Kecepatan kembali Vr 20.00 km/jam
Waktu siklus
((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75 Ts1 1.10 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.B Analisa EI-10B
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
3. TENAGA
Produksi menentukan : DUMP TRUCK Q4 0.49 M3 / Jam
Produksi ATB / hari = Tk x Q4 Qt 3.41 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 20.5071 Jam
- Mandor = (Tk x M) / Qt (L03) 4.1014 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.00 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2 Tabel 6.6.4.
- Agregat Pengunci Ap 25.00 Kg/M2 Tabel 6.6.4.
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2 Tabel 6.6.4.
As2 94.55 Kg/M3 (As1 : t)
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit Lihat panduan
Ts1 0.45 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.C Analisa EI-10C
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 23.0 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM Spec. 6.5.2 (2)
- Kadar Aspal terhadap berat total campuran As 4.50 % Tabel 6.5.3 (1)
- Tebal nominal padat t 0.04 M Tabel 6.5.3 (1)
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01 Ton/M3
- Aspal (diambil) D2 1.00 Ton/M3
- Agregat (diambil) D3 1.60 Ton/M3
7 Faktor kembang campuran Fk 1.20
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1997 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 90.4500 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts1
- Memuat T1 5.00 menit
- Mengaduk T2 3.50 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts1 13.50 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 1.844 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 12.91 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.5422 jam
- Pekerja = (Tk x P) : Qt (L01) 6.5060 jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.D Analisa EI-10D
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Rutin
SATUAN PEMBAYARAN : 10.D URAIAN ANALISA HARGA SATUAN
Lanjutan
Rp. 2,228,988.96 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 23.0 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 % 100 bagian
- Minyak Fluk / Pencair K 13.00 % 15 bagian
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Pencair D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter campuran
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 850.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus (termasuk proses pemanasan) Ts 2.00 Jam
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 352.75 liter
Produksi / hari = Tk x Q1 Qt 2,469.25 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang