TOTAL BIAYA
#DIV/0!
Cumm
Harga Jumlah % for
Satuan Harga-Harga Major
(Rupiah) (Rupiah) Items
g h i
1,085,830,000 0
27,779 0 #DIV/0!
640,289 0
653,088 0
786,678 0
1,294,246 0
2,160,948 0
- 0
19,173,779 0
178,500 0
268,002 0
26,279 0
59,899 0
229,153 0
175,239 0
749,107 0
621,883 0
- 0
129,946 0
520,989 0
10,070 0
267,372 0
330,840 0
279,639 0
208,055 0
305,907 0
121,426 0
724 0
- 0
553,908 0
494,676 0
1,586,589 0
266,260 0
7,984 0
11,081 0
9,101 0
549,190 0
479,932 0
446,900 0
1,620,870 0
233,671 0
- 0
- 0
8,906 0
9,662 0
5,682 0
8,973 0
10,418 0
42,380 0
51,707 0
75,319 0
1,121,214 0
2,222,660 0
982,272 0
92,878 0
89,570 0
1,003,513 0
960,100 0
2,246,671 0
2,153,976 0
971,331 0
930,543 0
2,119,631 0
2,017,498 0
903,616 0
873,025 0
10,623 0
3,828 0
6,049 0
1,832,188 0
8,649,964 0
59,000 0
1,533,891 0
1,731,323 0
1,850,540 0
2,199,985 0
2,022,504 0
1,787,884 0
1,487,260 0
1,422,343 0
1,122,602 0
985,439 0
1,027,506 0
26,785,374 0
29,464,895 0
30,287,952 0
31,277,952 0
32,267,952 0
32,927,952 0
34,722,052 0
34,577,952 0
246,233 0
38,227,145 0
1,279,323 0
18,469 0
11,899 0
12,625 0
11,495 0
12,625 0
39,750 0
12,741 0
12,741 0
12,741 0
672 0
547 0
5,313 0
- 0
30,632 0
20,968 0
- 0
5,515 0
43,463 0
108,914 0
5,051,342 0
1,072,585 0
163,729 0
54,576 0
54,576 0
54,576 0
56,659 0
56,659 0
56,659 0
821,574 0
1,451,186 0
2,258,911 0
3,244,747 0
5,057,462 0
- 0
- 0
- 0
- 0
- 0
- 0
6,348,094 0
7,681,752 0
9,047,437 0
11,442,934 0
238,727 0
311,943 0
369,348 0
591,437 0
815,566 0
815,593 0
330,421 0
428,733 0
51,929 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
125,219 0
163,350 0
- 0
389,699 0
- 0
- 0
245,708 0
213,525 0
- 0
- 0
- 0
1,629,627 0
- 0
- 0
569,608 0
539,006 0
390,465 0
452,341 0
2,536,974 0
- 0
1,725,881 0
1,415,472 0
10,767 0
73,511 0
155,284 0
135,555 0
207,573 0
429,530 0
8,047 0
7,805 0
7,420 0
212,484 0
178,593 0
563,448 0
758,118 0
607,998 0
846,148 0
111,864 0
382,455 0
174,294 0
683,630 0
110,681 0
174,701 0
149,484 0
- 0
5,377 0
81,433 0
- 0
- 0
712,569 0
23,151,596 0
1,583,360 0
1,560,383 0
1,583,360 0
1,560,383 0
1,583,360 0
350,312 350,312
1,112,920 1,112,920
9,507 0
6,914 0
8,643 0
182,829 0
354,516 0
175,190 0
387,804 0
373,283 0
347,042 0
251,494 0
496,412 0
592,962 0
375,047 0
367,497 0
32,310 0
387,038 0
147,238 0
74,959 0
24,323 0
23,990 0
84,201,167 0
34,918,058 0
47,565,272 0
10,020,356 0
67,593,360 0
1,463,231
No. Mata Perkiraan
Uraian Satuan
Pembayaran Kuantitas
a b c d
1.2 Mobilisasi LS -
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 -
2.2 Pasangan Batu dengan Mortar M3 -
2.3 (1) Gorong² Pipa Beton Bertulang, Diameter Dalam 50 cm M1 -
2.3 (2) Gorong² Pipa Beton Bertulang, Diameter Dalam 50 cm sampai 70 cm M1 -
2.3 (3) Gorong² Pipa Beton Bertulang, Diameter Dalam 70 cm sampai 100 cm M1 -
2.3 (4) Gorong2 Pipa Beton Bertulang, Diameter Dalam 100 cm sampai 130 cm M1 -
2.3 (5) Gorong2 Beton Tanpa Tulang Diameter Dalam 140 cm sampai 150 cm M1 -
2.3 (6) Gorong2 Pipa Baja Bergelombang Ton -
2.3 (7) Gorong2 Pipa Beton Tanpa Tulangan diameter dalam 20 cm sampai 30 cm M1 -
2.4 (1) Timbunan Porous atau Bahan Penyaring (Filter) M3 -
2.4 (2) Anyaman Filter Plastik M2 -
3.1 (1) Galian Biasa M3 -
3.1 (2) Galian Batu M3 -
3.1 (3) Galian Struktur dengan kedalaman 0 - 2 meter M3 -
3.1 (4) Galian Struktur dengan kedalaman 2 - 4 meter M3 -
3.1 (5) Galian Struktur dengan kedalaman 4 - 6 meter M3 -
3.1 (6) Coferdam, Penyokong, Pengaku dan Pekerjaan yang berkaitan LS -
3.1 (7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 -
3.1 (8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 -
3.1 (9) Biaya Tambahan untuk Pengangkutan Hasil Galian dengan Jarak melebihi M3/Km -
3.2 (1) Timbunan Biasa dari selain Galian Sumber Bahan M3 -
3.2 (2) Timbunan Pilihan M3 -
3.2 (3) Timbunan Pilihan diatas Tanah Rawa (diukur diatas bak truk) M3 -
3.2.(4) Timbunan Batu dengan Manual M3 -
3.2.(5) Timbunan Batu dengan Derek M3 -
3.2.(6) Timbunan Batu dengan Derek Ton -
3.3 Penyiapan Badan Jalan M2 -
3.4 Pengupasan Permukaan Aspal Lama dan Pencampuran Kembali (tebal 15 M3 -
4.2 (1) Lapis Pondasi Agregat Kelas A M3 -
4.2 (2) Lapis Pondasi Agregat Kelas B M3 -
4.2 (3) Semen untuk Lapis Pondasi Semen Tanah Ton -
4.2 (4) Lapis Pondasi Semen Tanah M3 -
4.2 (5) Agregat Penutup BURTU M2 -
4.2 (6) Bahan Aspal untuk Pekerjaan Pelaburan Liter -
4.2 (7) Lapis Resap Pengikat Liter -
5.1 (1) Lapis Pondasi Agregat Kelas A M3 -
5.1 (2) Lapis Pondasi Agregat Kelas B M3 -
5.2 (1) Lapis Pondasi Agregat Kelas C M3 -
5.4 (1) Semen untuk Lapis Pondasi Semen Tanah Ton -
5.4 (2) Lapis Pondasi Tanah Semen M3 -
5.5 (1) Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB)) M3 -
5.6 (1) Lapis Pondasi Agregat Dengan Cement Treated Base (CTB) M3 -
6.1 (1) Lapis Resap Pengikat Liter -
6.1 (2) Lapis Perekat Liter -
6.2 (1) Agregat Penutup BURTU M2 -
6.2 (2) Agregat Penutup BURDA M2 -
6.2 (3) Bahan Aspal untuk Pekerjaan Pelaburan Liter -
6.3 (1) Latasir Kelas A (SS-A) M2 -
6.3 (2) Latasir Kelas B (SS-B) M2 -
6.3 (3) Lataston Lapis Aus (HRS-WC) M2 -
6.3(3a) Lataston Lapis Aus (HRS-WC) Leveling Ton -
6.3(4) Lataston Lapis Pondasi (HRS-Base) M3 -
6.3(4a) Lataston Lapis Pondasi (HRS-Base) Leveling Ton -
6.3(5a) Laston Lapis Aus (AC-WC) M2 -
6.3(5b) Laston Lapis Aus (AC-WC) Modifikasi M2 -
6.3(5c) Laston Lapis Aus (AC-WC) Leveling Ton -
6.3(5d) Laston Lapis Aus (AC-WC) Modifikasi Leveling Ton -
6.3(6a) Laston Lapis Antara (AC-BC) M3 -
6.3(6b) Laston Lapis Antara (AC-BC) Modifikasi M3 -
6.3(6c) Laston Lapis Antara (AC-BC) Leveling Ton -
6.3(6d) Laston Lapis Antara (AC-BC) Modifikasi Leveling Ton -
6.3(7a) Laston Lapis Pondasi (AC-Base) M3 -
6.3(7b) Laston Lapis Pondasi (AC-Base) Modifikasi M3 -
6.3(7c) Laston Lapis Pondasi (AC-Base) Leveling Ton -
6.3(7d) Laston Lapis Pondasi (AC-Base) Modifikasi Leveling Ton -
6.4 (1) Lasbutag M2 -
6.4 (2) Latasbusir Kelas A M2 -
6.4 (3) Latasbusir Kelas B M2 -
6.4 (4) Bitumen Asbuton Ton -
6.4 (5) Bitumen Bahan Peremaja Ton -
6.4 (6) Bahan Anti Pengelupasan (anti stripping agent) Liter -
6.5 Campuran Aspal Dingin untuk Pelapisan M3 -
6.6.1 Lapis Permukaan Penetrasi Macadam M3 -
6.6.2 Lapis Fondasi atau Perata Penetrasi Macadam M3 -
7.1 (1) Beton K500 M3 -
7.1 (2) Beton K400 M3 -
7.1 (3) Beton K350 (readymix) M3 -
7.1 (4) Beton K300 (readymix) M3 -
7.1 (5) Beton K250 (readymix) M3 -
7.1 (6) Beton K175 M3 -
7.1 (7) Beton Siklop K175 M3 -
7.1 (8) Beton K125 M3 -
7.2 (1) Unit Pracetak Gelagar Tipe I bentang 16 m Buah -
7.2 (2) Unit Pracetak Gelagar Tipe I bentang 20 m Buah -
7.2 (3) Unit Pracetak Gelagar Tipe I bentang 22 m Buah -
7.2 (4) Unit Pracetak Gelagar Tipe I bentang 25 m Buah -
7.2 (5) Unit Pracetak Gelagar Tipe I bentang 28 m Buah -
7.2 (6) Unit Pracetak Gelagar Tipe I bentang 30 m Buah -
7.2 (7) Unit Pracetak Gelagar Tipe I bentang 31 m Buah -
7.2 (8) Unit Pracetak Gelagar Tipe I bentang 35 m Buah -
7.2 (9) Baja Prategang Kg -
7.2 (10) Pelat Berongga (Hollow Slab) pracetak bentang 21 m Buah -
7.2 (11) Beton Diafragma K350 termasuk pekerjaan penegangan setelah pengecoran M3 -
7.3 (1) Baja Tulangan U24 Polos Kg -
7.3 (2) Baja Tulangan U32 Polos Kg -
7.3 (3) Baja Tulangan U32 Ulir Kg -
7.3 (4) Baja Tulangan U39 Ulir Kg -
7.3 (5) Baja Tulangan U48 Ulir Kg -
7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg -
7.4 (1) Baja Struktur Titik leleh 2500 kg/cm2 penyediaan dan pemasangan Kg -
7.4 (2) Baja Struktur Titik leleh 2800 kg/cm2 penyediaan dan pemasangan Kg -
7.4 (3) Baja Struktur Titik leleh 3500 kg/cm2 penyediaan dan pemasangan Kg -
7.5 (1) Pemasangan Jembatan Rangka Baja Kg -
7.5 (2) Pengangkutan Bahan Jembatan Kg -
7.6 (1) Pondasi Cerucuk, Penyediaan dan Pemancangan M1 -
7.6 (2) Dinding Turap Kayu Tanpa Pengawetan M2 -
7.6 (3) Dinding Turap Kayu Dengan Pengawetan M2 -
7.6 (4) Dinding Turap Baja M2 -
7.6 (5) Dinding Turap Beton M2 -
7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan M3 -
7.6 (7) Penyediaan Tiang Pancang Kayu Dengan Pengawetan M3 -
7.6 (8) Penyediaan Tiang Pancang Baja Kg -
7.6 (9) Penyediaan Tiang Pancang Beton Bertulang Pracetak M3 -
7.6 (10) Penyediaan Tiang Pancang Beton Pratekan Pracetak M3 -
7.6 (11) Pemancangan Tiang Pancang Kayu M1 -
7.6 (12) Pemancangan Tiang Pancang Pipa Baja : Diameter 400 mm M1 -
7.6 (13) Pemancangan Tiang Pancang Pipa Baja : Diameter 500 mm M1 -
7.6 (14) Pemancangan Tiang Pancang Pipa Baja : Diameter 600 mm M1 -
7.6 (15) Pemancangan Tiang Pancang Beton Pracetak :30 cm x 30 cm atau diamet M1 -
7.6 (16) Pemancangan Tiang Pancang Beton Pracetak :40 cm x 40 cm atau diamet M1 -
7.6 (17) Pemancangan Tiang Pancang Beton Pracetak :50 cm x 50 cm atau diamet M1 -
7.6 (18) Tiang Bor Beton, dia. 600 mm M1 -
7.6 (19) Tiang Bor Beton, dia. 800 mm M1 -
7.6 (20) Tiang Bor Beton, dia. 1000 mm M1 -
7.6 (21) Tiang Bor Beton, dia. 1200 mm M1 -
7.6 (22) Tiang Bor Beton, dia. 1500 mm M1 -
7.6 (23) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(11) s/d M1 -
0 7.6.(17) bila Tiang Pancang Beton dikerjakan ditempat yang Berair 0 -
7.6 (24) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(18) s/d M1 -
0 7.6.(22) bila Tiang Pancang Bor Beton dikerjakan ditempat yang Berair 0 -
7.6 (25) Pengujian Pembebanan pada Tiang dengan diameter sampai 600 mm Buah -
7.6 (26) Pengujian Pembebanan pada Tiang dengan diameter diatas 600 mm Buah -
7.7 (1) Penyediaan Dinding Sumuran Silinder, Diameter 250 cm M1 -
7.7 (2) Penyediaan Dinding Sumuran Silinder, Diameter 300 cm M1 -
7.7 (3) Penyediaan Dinding Sumuran Silinder, Diameter 350 cm M1 -
7.7 (4) Penyediaan Dinding Sumuran Silinder, Diameter 400 cm M1 -
7.7 (5) Penurunan Dinding Sumuran Silinder, Diameter 250 cm M1 -
7.7 (6) Penurunan Dinding Sumuran Silinder, Diameter 300 cm M1 -
7.7 (7) Penurunan Dinding Sumuran Silinder, Diameter 350 cm M1 -
7.7 (8) Penurunan Dinding Sumuran Silinder, Diameter 400 cm M1 -
7.9 Pasangan Batu M3 -
7.10 (1) Pasangan Batu Kosong yang diisi Adukan M3 -
7.10 (2) Pasangan Batu Kosong M3 -
7.10 (3) Bronjong M3 -
7.11 (1) Expansion Joint Tipe Asphaltic Plug M1 -
7.11 (2) Expansion Joint Tipe Rubber 1 (celah 21-41 mm) M1 -
7.11 (3) Expansion Joint Tipe Rubber 2 (celah 32-62 mm) M1 -
7.11 (4) Expansion Joint Tipe Rubber 3 (celah 42-82 mm) M1 -
7.11 (5) Joint Filler untuk Sambungan Konstruksi M1 -
7.11 (6) Expansion Joint Tipe Baja Bersudut M1 -
7.12 (1) Perletakan Logam Buah -
7.12 (2) Perletakan Elastomerik Jenis 1 (300 x 350 x 36) Buah -
7.12 (3) Perletakan Elastomerik Jenis 2 (350 x 400 x 39) Buah -
7.12 (4) Perletakan Elastomerik Jenis 3 (400 x 450 x 45) Buah -
7.12 (5) Perletakan Strip M1 -
7.13 Sandaran (Railing) M1 -
7.14 Papan Nama Jembatan Buah -
7.15.(1) Penmbongkaran Pasangan Batu M3 -
7.15.(2) Pembongkaran Beton M3 -
7.15.(3) Pembongkaran Beton Pratekan M3 -
7.15.(4) Pembongkaran Bangunan Gedung M2 -
7.15.(5) Pembongkaran Rangka Baja M2 -
7.15.(6) Pembongkaran Balok Baja (Steel Stringers) M1 -
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2 -
7.15.(8) Pembongkaran Jembatan Kayu M2 -
7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 / Km -
7.16 (1) Perkerasan Jalan Beton M3 -
7.17 (1) Wet Lean Concrete M2 -
7.17 (2) Sand Bedding (t = 4 cm) M2 -
8.1 (1) Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3 -
8.1 (2) Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3 -
8.1 (3) Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur) -
8.1 (4) Waterbound Macadam untuk Pekerjaan Minor M3 -
8.1 (5) Campuran Aspal Panas untuk Pekerjaan Minor M3 -
8.1 (6) Lasbutag atau Latasbusir untuk Pekerjaan Minor M3 -
8.1 (7) Penetrasi Macadam untuk Pekerjaan Minor M3 -
8.1 (8) Campuran Aspal Dingin untuk Pekerjaan Minor M3 -
8.1 (9) Residu Bitumen untuk Pekerjaan Minor Liter -
8.2(1) Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3 -
8.2(2) Pembersihan dan Pembongkaran Tanaman (diamater < 30 cm) M2 -
8.2(3) Pemotongan Pohon diameter 30 - 50 cm Buah -
8.2(4) Pemotongan Pohon diameter 50 - 75 cm Buah -
8.2(5) Pemotongan Pohon diameter > 75 cm Buah -
8.3.(1) Stabilisasi dengan Tanaman M2 -
8.3.(2) Semak / Perdu M2 -
8.3.(3) Pohon Buah -
8.4.(1) Marka Jalan Termoplastik M2 -
8.4.(2) Marka Jalan Bukan Termoplastik M2 -
8.4.(3) .(a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah -
8.4.(3) .(b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah -
8.4.(4) .(a) Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah -
8.4.(4) .(b) Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah -
8.4.(5) Patok Pengarah Buah -
8.4.(6) .(a) Patok Kilometer Buah -
8.4.(6) .(b) Patok Hektometer Buah -
8.4.(7) Rel Pengaman M1 -
8.4.(8) Paku Jalan Buah -
8.4.(9) Mata Kucing Buah -
8.4.(10) Kerb Pracetak M1 -
8.4.(11) Kerb yang digunakan kembali M1 -
8.4.(12) Perkerasan Blok Beton pada Trotoar dan Median M2 -
8.5(1) Pengembalian Kondisi Lantai Jembatan Beton M2 -
8.5(2) Pengembalian Kondisi Lantai Jembatan Kayu M2 -
8.5(3) Pengembalian Kondisi Pelapisan Permukaan Baja Struktur M2 -
8.6(1) Kerb Pracetak Pemisah Jalan (Concrete Barrier) M1 -
8.7(1) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 Watt Buah -
8.7(2) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 Watt Buah -
8.7(3) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah -
8.7(4) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah -
8.7(5) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah -
8.7(6) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah -
8.8(1) Pagar Pemisah Pedestrian Carbon Steel M1 1.0
8.8(2) Pagar Pemisah Pedestrian Galvanized M1 1.0
9.1 Mandor Jam -
9.2 Pekerja Biasa Jam -
9.3 Tukang Kayu, Tukang Batu, dsb Jam -
9.4 Dump Truck, kapasitas 3-4 m³ Jam -
9.5 Truk Bak Datar 3 - 4 ton Jam -
9.6 Truk Tangki 3000 - 4500 Liter Jam -
9.7 Bulldozer 100 - 150 PK Jam -
9.8 Motor Grader min 100 PK Jam -
9.9 Loader Roda Karet 1.0 - 1.6 M3 Jam -
9.10 Loader Roda Berantai 75 - 100 PK Jam -
9.11 Alat Penggali (Excavator) 80 - 140 PK Jam -
9.12 Crane 10 - 15 Ton Jam -
9.13 Penggilas Roda Besi 6 - 9 Ton Jam -
9.14 Penggilas Bervibrasi 5 - 8 Ton Jam -
9.15 Pemadat Bervibrasi 1.5 - 3.0 PK Jam -
9.16 Penggilas Roda Karet 8 - 10 Ton Jam -
9.17 Kompresor 4000 - 6500 Ltr/mnt Jam -
9.18 Beton Pengaduk (Molen) 0.3 - 0.6 M3 Jam -
9.19 Pompa Air 70 - 100 mm Jam -
9.20 Jack Hammer Jam -
10.1 (1) Pemeliharaan Rutin Perkerasan LS -
10.1 (2) Pemeliharaan Rutin Bahu Jalan LS -
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan LS -
10.1 (4) Pemeliharaan Rutin Perlengkapan Jalan LS -
10.1 (5) Pemeliharaan Rutin Jembatan LS -
Harga % Thd. Jumlah
Satuan Total Biaya Harga-Harga
(Rupiah) (%) (Rupiah)
e f g = (d x e)
1,085,830,000 #DIV/0! 0
27,779 0
640,289 0
653,088 0
786,678 0
1,294,246 0
2,160,948 0
- - 0
19,173,779 0
178,500 0
268,002 0
26,279 0
59,899 0
229,153 0
175,239 0
749,107 0
621,883 0
- - 0
129,946 0
520,989 0
10,070 0
267,372 0
330,840 0
279,639 0
208,055 0
305,907 0
121,426 0
724 0
- - 0
553,908 0
494,676 0
1,586,589 0
266,260 0
7,984 0
11,081 0
9,101 0
549,190 0
479,932 0
446,900 0
1,620,870 0
233,671 0
- - 0
- - 0
8,906 0
9,662 0
5,682 0
8,973 0
10,418 0
42,380 0
51,707 0
75,319 0
1,121,214 0
2,222,660 0
982,272 0
92,878 0
89,570 0
1,003,513 0
960,100 0
2,246,671 0
2,153,976 0
971,331 0
930,543 0
2,119,631 0
2,017,498 0
903,616 0
873,025 0
10,623 0
3,828 0
6,049 0
1,832,188 0
8,649,964 0
59,000 0
1,533,891 0
1,731,323 0
1,850,540 0
2,199,985 0
2,022,504 0
1,787,884 0
1,487,260 0
1,422,343 0
1,122,602 0
985,439 0
1,027,506 0
26,785,374 0
29,464,895 0
30,287,952 0
31,277,952 0
32,267,952 0
32,927,952 0
34,722,052 0
34,577,952 0
246,233 0
38,227,145 0
1,279,323 0
18,469 0
11,899 0
12,625 0
11,495 0
12,625 0
39,750 0
12,741 0
12,741 0
12,741 0
672 0
547 0
5,313 0
- - 0
30,632 0
20,968 0
- - 0
5,515 0
43,463 0
108,914 0
5,051,342 0
1,072,585 0
163,729 0
54,576 0
54,576 0
54,576 0
56,659 0
56,659 0
56,659 0
821,574 0
1,451,186 0
2,258,911 0
3,244,747 0
5,057,462 0
- - 0
- - 0
- - 0
- - 0
- - 0
- - 0
6,348,094 0
7,681,752 0
9,047,437 0
11,442,934 0
238,727 0
311,943 0
369,348 0
591,437 0
815,566 0
815,593 0
330,421 0
428,733 0
51,929 0
- - 0
- - 0
- - 0
- - 0
- - 0
- - 0
- - 0
- - 0
- - 0
- - 0
125,219 0
163,350 0
- - 0
389,699 0
- - 0
- - 0
245,708 0
213,525 0
- - 0
- - 0
- - 0
1,629,627 0
- - 0
- - 0
569,608 0
539,006 0
390,465 0
452,341 0
2,536,974 0
- - 0
1,725,881 0
1,415,472 0
10,767 0
73,511 0
155,284 0
135,555 0
207,573 0
429,530 0
8,047 0
7,805 0
7,420 0
212,484 0
178,593 0
563,448 0
758,118 0
607,998 0
846,148 0
111,864 0
382,455 0
174,294 0
683,630 0
110,681 0
174,701 0
149,484 0
- - 0
5,377 0
81,433 0
- - 0
- - 0
712,569 0
23,151,596 0
1,583,360 0
1,560,383 0
1,583,360 0
1,560,383 0
1,583,360 0
350,312 350,312
1,112,920 1,112,920
9,507 0
6,914 0
8,643 0
182,829 0
354,516 0
175,190 0
387,804 0
373,283 0
347,042 0
251,494 0
496,412 0
592,962 0
375,047 0
367,497 0
32,310 0
387,038 0
147,238 0
74,959 0
24,323 0
23,990 0
84,201,167 0
34,918,058 0
47,565,272 0
10,020,356 0
67,593,360 0
#DIV/0!
###
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
KEGIATAN :
PEKERJAAN :
JENIS KEGIATAN :
Prop / Kota :
1 Umum
2 Drainase
3 Pekerjaan Tanah
4 Pelebaran Perkerasan dan Bahu Jalan
5 Pekerasan Non Aspal
6 Perkerasan Aspal
7 Struktur
8 Pengembalian Kondisi dan Pekerjaan Minor
9 Pekerjaan Harian
10 Pekerjaan Pemeliharaan Rutin
( ............................. ) ( ............................. )
Jumlah Harga
Pekerjaan
(Rupiah)
0
0
0
0
0
0
0
0
0
0
0
0
0 -1
....................................
....................................
Panitia Pelelangan
Ketua,
( ............................. )
INFORMASI UMUM
No. U RAIAN I N F O R MAS I
1. KEGIATAN : ………………………………………………
2. PEKERJAAN : ……………………………………………………………
JENIS KEGIATAN : KONTRAK
3. Propinsi / Kabupaten / Kotamadya : KALBAR / KOTA PONTIANAK
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 8.73 Kilometer
7.45 Km = a C 7.45 Km = b
A B
5.0 Km = c
Base Camp ---------> D
20 ....................................
21 ....................................
22 ....................................
N F O R MAS I
………………………
…………………………………………..
................
( Leff = a + b )
meter
meter
eriode Pelaksanaan)
...........
............
.............
...........
............
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
HARGA
No. U RAIAN SATUAN VOL. SATUAN
(Rp.)
B. PERALATAN
Periksa lembar 1.2-2
C. FASILITAS KONTRAKTOR
1 Base Camp M2 150 50,000
2 Kantor M2 60 75,000
3 Barak M2 60 45,000
4 Bengkel M2 100 25,000
5 Gudang, dan lain-lain M2 100 25,000
6 ...................... .... 0 0
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 108 55,000
3 Bituminous Testing
Marshall Asphalt Test Set 1 20,000,000
Extraction Test, Centrifuge/Refflux Method Set 1 9,000,000
Specific Gravity for Coarse Aggregate Set 1 9,000,000
Specific Gravity for Fine Aggregate Set 1 9,000,000
Mix Air Viod Content (Accurate Method) Set 1 15,000,000
Core Drill Set 1 15,000,000
Metal Thermometer Set 1 1,000,000
Accessories and Tolls Set 1 5,000,000
Penetration Test Bln 6 1,000,000
Softening Point Set 1 6,000,000
Refusal Density Compactor Set 1 15,000,000
4 Concrete Testing
Slump Cone Set 1 500,000
Cylinder/Cube Mould for Compressive Strength Set 1 10,000,000
Beam Mould for Flexural Strength (RIGID) Set 1 10,000,000
Crushing Machine Set 1 50,000,000
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 1
2 Papan Proyek buah 1 400,000
3 Pengukuran dan Pematokan lsm 0 0
4 ...................... .... 0 0
5 ...................... .... 0 0
6 ...................... .... 0 0
F. DEMOBILISASI LS 1 17,490,000
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
KODE HARGA
No. JENIS ALAT ALAT SATUAN VOL. SATUAN
(Rp.)
B. PERALATAN
58,300,000
II. Soil & Aggregate Testing
1. Compaction Test
2. CBR Test
7,500,000 3 Specifc Gravity
4,500,000 4 Atterberg Limits
2,700,000 5 Grain Size Analysis
2,500,000 6 Field Density Test by Sand Cone Methode
2,500,000 7 Moisture Content
0 8 Abrasion of Aggregate by Los Angeles Machine
17,490,000
1,085,830,000
Lembar 1.2-2
JUMLAH
HARGA
(Rp.)
0
500,000
100,000
0
150,000
100,000
150,000
2,700,000
750,000
0
150,000
300,000
500,000
500,000
500,000
1,000,000
500,000
500,000
500,000
250,000
40,000,000
100,000
150,000
50,000
50,000
100,000
500,000
1,000,000
2,000,000
2,000,000
2,000,000
400,000
500,000
300,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
58,300,000
FASILITAS LABORATORIUM
: Lump sum
: Rp. 779,940,000.00
HARGA
SATUAN VOLUME TOTAL KETERANGAN
SATUAN
4 Bulldozer E04
9.7 7 175 7 1225 jam
6 Concrete Vibrator
7.1(5) 4 100 7 700 m3
7.1(6) 4 100 7 700 m3
7.1(8) 4 100 7 700 m3
7 Compressor E05
6.1(1) 9 225 7 1575 liter
9.17 7 175 7 1225 jam
8 Crane E07
9.12 7 175 7 1225 jam
10 Excavator E10
2.1 7 175 7 1225 m3
3.1(1) 6 150 7 1050 m3
9.11 7 175 7 1225 jam
a b
DIVISI 1. UMUM
1.2 Mobilisasi
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air
2.1.a Galian Utk Drainase, Saluran dan Saluran Air (manual & diangkut)
2.1.b Galian Utk Drainase, Saluran dan Saluran Air (manual)
2.2 Pasangan Batu dengan Mortar
2.2.a Pasangan Batu Dengan Mortar untuk Saluran
2.3 (3) Gorong² Pipa Beton Bertulang, Diameter Dalam 70 cm sampai 100 cm
2.3 (3).a Koker (Box Culvert) Beton Bertulang, Ukuran dalam 70 cm sampai 100 cm
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
No. Mata Uraian
Pembayaran
DIVISI 7. STRUKTUR
7.1 (3) Beton K350 (readymix)
7.1 (4) Beton K300 (readymix)
7.1 (5) Beton K250 (readymix)
7.1 (5).a Beton K225 (readymix)
7.1 (6).a Beton K175 (readymix)
7.1 (6) Beton K175
7.1 (7) Beton Siklop K175
7.1 (8) Beton K125
7.2 (1) Unit Pracetak Gelagar Tipe I bentang 16 m
7.2 (2) Unit Pracetak Gelagar Tipe I bentang 20 m
7.2 (3) Unit Pracetak Gelagar Tipe I bentang 22 m
7.2 (4) Unit Pracetak Gelagar Tipe I bentang 25 m
7.2 (5) Unit Pracetak Gelagar Tipe I bentang 28 m
7.2 (6) Unit Pracetak Gelagar Tipe I bentang 30 m
7.2 (7) Unit Pracetak Gelagar Tipe I bentang 31 m
7.2 (8) Unit Pracetak Gelagar Tipe I bentang 35 m
7.3 (1) Baja Tulangan U24 Polos
7.3 (2) Baja Tulangan U32 Polos
7.3 (3) Baja Tulangan U32 Ulir
7.3 (4) Baja Tulangan U39 Ulir
7.3 (5) Baja Tulangan U48 Ulir
7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh)
7.6 (1) Pondasi Cerucuk, Penyediaan dan Pemancangan
7.6 (11) Pemancangan Tiang Pancang Kayu
7.6 (15) Pemancangan Tiang Pancang Beton Pracetak :30 cm x 30 cm atau diameter 300 mm
7.9 Pasangan Batu
7.13 Sandaran (Railing)
7.14 Papan Nama Jembatan
7.15.(2) Pembongkaran Beton
7.15.(5) Pembongkaran Rangka Baja
7.16 (1) Perkerasan Jalan Beton
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
UAN PEKERJAAN (UNIT PRICE)
JANUARI 2009
LS 1,085,830,000
M3 27,778.79
M3 95,903.10
M3 42,911.00
M 3
640,289.25
M3 716,503.33
M1 1,294,246.12
M1 3,107,441.58
M3 59,898.83
M3 115,586.33
M3 93,071.00
M 3
229,153.16
M3 175,239.03
M3 169,401.83
M3 66,380.72
M3 267,372.40
M3 210,219.34
M 3
330,840.45
M3 296,814.05
M3 138,876.29
M2 724.35
M3 553,907.74
M3 494,676.44
M2 7,984.07
Liter 11,080.63
Liter 9,100.79
M3 178,355.16
M3 264,949.87
M3 36,294.27
M3 549,189.55
M3 479,931.51
Satuan Perkiraan Harga Jumlah
Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
M 3
446,899.70
Ton 1,620,869.85
M3 233,670.67
M3 410,898.63
M3 259,735.67
M 3
324,151.67
Liter 8,906.25
Liter 9,662.19
M2 5,681.69
M2 8,973.45
Liter 10,418.12
M2 51,707.05
M 2
56,220.67
M2 56,162.42
M2 75,319.01
M3 2,222,659.75
Ton 982,272.39
M2 92,878.43
M 3
2,246,671.17
M3 2,119,631.37
M3 1,533,890.51
M3 1,731,323.08
M3 1,721,769.59
M 3
1,925,989.64
M3 1,850,539.65
M3 1,841,447.07
M3 1,826,962.22
Satuan Perkiraan Harga Jumlah
Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
M3 1,787,883.57
M3 1,487,259.54
M3 1,422,342.90
M 3
1,381,416.21
M3 1,312,764.62
M3 1,122,602.39
M3 985,439.45
M3 1,027,505.63
Buah 26,785,374.00
Buah 29,464,895.43
Buah 30,287,951.57
Buah 31,277,951.57
Buah 32,267,951.57
Buah 32,927,951.57
Buah 34,722,051.57
Buah 34,577,951.57
Kg 18,469.00
Kg 11,899.25
Kg 12,625.25
Kg 11,495.00
Kg 12,625.25
Kg 39,750.15
M1 5,313.46
M1 163,729.20
M1 56,659.02
M 3
815,565.93
M1 125,218.73
Buah 163,350.00
M3 389,698.87
M2 245,708.34
M3 1,629,627.03
M3 1,725,880.67
M3 73,510.65
M 2
155,284.19
Buah 135,554.75
Buah 207,572.91
Buah 429,529.68
M2 7,804.50
Buah 7,419.50
M 2
212,483.78
M2 36,728.21
M1 149,483.61
M2 5,376.53
M1 712,568.71
Buah 23,151,595.97
Buah 1,583,359.51
Buah 1,560,382.63
Buah 1,583,359.51
Buah 1,560,382.63
Buah 1,583,359.51
Jam 9,507.14 0
Jam 6,914.29 0
Jam 8,642.86 0
Jam 182,829.05 0
Satuan Perkiraan Harga Jumlah
Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
Jam 354,516.47 0
Jam 175,190.18 0
Jam 387,804.48 0
Jam 373,283.06 0
Jam Err:511 Err:511
Jam 251,493.89 0
Jam 496,412.06 0
Jam 592,961.86 0
Jam 375,047.49 0
Jam 367,496.77 0
Jam 32,309.64 0
Jam 387,037.96 0
Jam 147,237.99 0
Jam 74,958.59 0
Jam 24,323.03 0
Jam 23,990.30 0
LS 84,201,166.56 0
LS 34,918,058.05 0
LS 47,565,272.36 0
LS 10,020,356.47 0
LS 67,593,360.26 0
0
ITEM PEMBAYARAN NO. : 2.1
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan D 1.60 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor Konversi (<40 %) Fv 0.9
Waktu siklus = T1 x Fv Ts1 0.29 menit
- Menggali, memuat dan berputar T1 0.3 menit
Berlanjut ke halaman b
ITEM PEMBAYARAN NO. : 2.1
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SA
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 938.07 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0298 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0075 Jam
Rp. 27,778.79 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 20 %
: - Volume Pasir Ps 80 %
7 Perbandingan Batu & Mortar :
- Batu Bt 60 %
- Mortar (campuran semen & pasir) Mr 40 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.67 ton/M3
- Semen Portland D5 1.44 ton/M3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.1 M3
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 0.1120
x {D5 x (1000)} (M12) 161 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.4829 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 300.00 Liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 5.00 menit
- Mengaduk T2 3.00 menit
- Menuang T3 1.00 menit
- Menunggu, dll. T4 1.00 menit
Ts1 10.00 menit
3. TENAGA
Produksi Pas. Batu yang menentukan ( Prod. C. Mixer ) Q1 1.49 M3/Jam
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt 10.46 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6693 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.0080 jam
- Pekerja = (Tk x P) : Qt (L01) 6.6934 jam
Rp. 640,289.25 / M3
KETERANGAN
KETERANGAN
Analisa EI-22
KETERANGAN
Lepas
Berlanjut ke halaman berikut
Analisa EI-22
KETERANGAN
Analisa EI-233
sampai 100 cm
URAIAN ANALISA HARGA SATUAN
Analisa EI-21
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 2.1 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan SalurTOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 0 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 2.2 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pasangan Batu Dengan Mortar untuk STOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
TUAN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
187.62
64.49
252.11
0.00
3,367.53
21,633.81
0.00
25,001.34
25,253.45
2,525.34
27,778.79
atan, volume dan/atau ukuran
TUAN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
42,073.05
15,777.40
5,785.04
63,635.49
241,596.00
206,080.00
25,157.75
472,833.75
45,611.90
0.00
45,611.90
582,081.14
58,208.11
640,289.25
atan, volume dan/atau ukuran
TUAN
ITEM PEMBAYARAN NO. : 3.1 (1)
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
6 Berat volume tanah (lepas) D 1.60
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93
Faktor Bucket Fb 1.00
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90
Waktu siklus Ts1
- Menggali / memuat (standar) T1 0.320
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01
Produksi Galian / hari = Tk x Q1 Qt 938.07
Kebutuhan tenaga :
- Pekerja P 2.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0149
- Mandor = (Tk x M) : Qt (L03) 0.0075
Rp. 59,898.83 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
7 Pengurugan kembali (backfill) untuk struktur Uk 50.00
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 (EI-322) 0.50
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93
Faktor Bucket Fb 1.00
Faktor Efisiensi alat Fa 0.83
Faktor konversi (kedalaman < 40 %) Fv 0.90
Berat isi material Bim 0.85
Waktu siklus
- Menggali, memuat, lain-lain (standar) T1 0.32
Waktu siklus = T1 x Fv Ts1 0.29
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 2.0
- Waktu kembali = (L x 60) : Vr T2 1.2
- Waktu lain-lain T3 0.05
Ts 3.25
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01
Produksi Galian / hari = Tk x Q1 Qt 938.07
Kebutuhan tenaga :
- Pekerja P 4.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0298
- Mandor = (Tk x M) : Qt (L03) 0.0075
Rp. 175,239.03 / M3
SATUAN KETERANGAN
Jam
-
ton/m3 1.40 - 1.80
Km
M3
-
lihat panduan
menit
menit
menit
M3/Jam
Jam
ton
-
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
M3/Jam
Jam
Lump Sump
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-313
SATUAN KETERANGAN
Jam
-
%/M3
Km
M3
M3 cek item 3.1(6)
M3
-
-
-
-
menit
menit
M3/Jam
Jam
-
-
Km/Jam
Km/Jam
M3
menit
menit
menit
menit
M3
Jam
Lump Sump
Berlanjut ke halaman berikut
Analisa EI-313
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-33
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 3.1 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 3.1 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Struktur dengan Kedalaman 0 - 2 TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0075 451,283.70
2. Bulldozer (E04) Jam 0.014502 365,906.67
3. Alat bantu Ls 1.0000 0.00
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
93.81
64.49
158.30
0.00
3,367.53
50,927.65
0.00
54,295.18
54,453.48
5,445.35
59,898.83
as jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
187.62
64.49
252.11
150,382.02
150,382.02
3,367.53
5,306.54
0.00
8,674.07
159,308.21
15,930.82
175,239.03
as jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Lebar bahu jalan Lb 1.00 M
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 %
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 %
- Pasir Urug PU 30.00 %
10 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh 1.05
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) 1.25861 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain T1 0.45 menit
Berlanjut ke
ITEM PEMBAYARAN NO. : 4.2 (1)
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA H
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam
Berlanjut ke
ITEM PEMBAYARAN NO. : 4.2 (1)
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A
SATUAN PEMBAYARAN : M3 URAIAN ANALISA H
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Lebar bahu jalan Lb 1.00 M
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 %
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 %
- Sirtu St 64.00 %
10 Berat volume agregat (lepas) Bil 1.51 ton/m3
- Agregat B Fh 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Memuat dan lain-lain T1 0.45 menit
Berlanjut ke
ITEM PEMBAYARAN NO. : 4.2 (2)
JENIS PEKERJAAN : Lps. Pond. Ag. Kls. B, CBR Min 60%
SATUAN PEMBAYARAN : M3 URAIAN ANALISA H
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam
Berlanjut ke
ITEM PEMBAYARAN NO. : 4.2 (2)
JENIS PEKERJAAN : Lps. Pond. Ag. Kls. B, CBR Min 60%
SATUAN PEMBAYARAN : M3 URAIAN ANALISA H
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal SBST t 1.50 Cm
9 Lapisan SBST terdiri dari (spesifikasi) :
- Menggunakan material ukuran Ld 1.30 Cm
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : V - loading Ts1 0.45 menit
KETERANGAN
Gradasi harus
memenuhi Spec.
(lepas)
kondisi sedang
panduan
KETERANGAN
1 x pp
Lump Sum
KETERANGAN
Analisa EI-422
KETERANGAN
Gradasi harus
memenuhi
Spesifikasi
Pemuatan lepas
sedang
panduan
KETERANGAN
1 x pp
Lump Sum
KETERANGAN
Analisa EI-425
KETERANGAN
lihat tabel
V - Loading
kondisi sedang
Analisa EI-425
Analisa EI-42
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 4.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 4.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lps. Pond. Ag. Kls. B, CBR Min 60% TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 4.2 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Agregat Penutup BURTU TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
373.79
73.42
447.21
396,586.12
396,586.12
2,680.18
83,816.12
3,179.97
14,605.72
2,237.17
0.00
106,519.16
503,552.49
50,355.25
553,907.74
atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
373.79
73.42
447.21
342,739.48
342,739.48
2,680.18
83,816.12
3,179.97
14,605.72
2,237.17
0.00
106,519.16
449,705.86
44,970.59
494,676.44
atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
15.37
1.06
16.43
5,357.60
5,357.60
38.57
1,504.81
340.84
0.00
1,884.22
7,258.24
725.82
7,984.07
atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00
- Pasir Urug PU 30.00
9 Berat Isi Agregat (lepas) Bil 1.51
Faktor kehilangan - Agregat A Fh1 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu Siklus :
- Memuat dan lain-lain T1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595
- Mandor = (Tk x M) : Qt (L03) 0.0085
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00
- Sirtu St 64.00
9 Berat volume agregat (lepas) Bil 1.51
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
Faktor kehilangan - Sirtu Fh3 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45
Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0595
- Mandor = (Tk x M) : Qt - 0.0085
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal lapis Agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Berat isi agregat (lepas) Bil 1.51
Faktor kehilangan - Agregat C Fh 1.05
1. BAHAN
Material Agregat Kelas C hasil produksi di Base Camp
Setiap 1 M3 Agregat padat diperlukan : 1 x (Bip/Bil) x Fh (M28) 1.2586
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu siklus Ts1
- Muat T1 0.45
Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 77.96
Produksi Agregat / hari = Tk x Q1 Qt 545.69
Kebutuhan tenaga :
- Pekerja P 7.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0898
- Mandor = (Tk x M) : Qt (L03) 0.0128
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal rata2 Telford t 0.150
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilangan - Agregat Fh1 1.20
Faktor kehilangan - PASIR Fh2 1.20
8 Komposisi campuran Lapen (spesifikasi) :
- Batu ukuran 10/15 Ak 0.69
- Batu ukuran 5/7 Ap1 0.28
- Pasir : As1 0.42
1. BAHAN
1.a. Batu uk. 10/15 = Ak x FH1 (M03) 0.8333
1.b. Batu uk. 5/7 = Ak x FH1 (M04) 0.3333
1.c. Pasir = Ak x FH2 (M10) 0.5000
2. ALAT
2.a. THREE WHEEL ROLLER (E16)
Kecepatan rata-rata alat v 1.50
Lebar efektif pemadatan b 1.90
Jumlah lintasan n 12.00
Faktor Efisiensi alat Fa 0.83
3. TENAGA
Produksi Telford / jam = Q1 8.57
Produksi Telford/ hari = Q1 x Tk Qt 60.00
Kebutuhan tenaga :
- Pekerja P 99.00
- Mandor M 3.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 11.5500
- Mandor = (Tk x M) / Qt (L03) 0.3500
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal rata2 Telford t 0.150
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilangan - Batu Kong Fh1 1.20
Faktor kehilangan - PASIR Fh2 1.20
8 Komposisi campuran Lapen (spesifikasi) :
- Batu Kong Ak 60.00
1. BAHAN
1.a. Batu kong (M03) 1.2000
ITEM PEMBAYARAN NO. : 5.7 (2)
JENIS PEKERJAAN : Lapisan Batu Kong
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HA
3. TENAGA
Produksi Telford / jam = Q1 8.57
Produksi Telford/ hari = Q1 x Tk Qt 60.00
Kebutuhan tenaga :
- Pekerja P 74.00
- Mandor M 2.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 8.6333
- Mandor = (Tk x M) / Qt (L03) 0.2333
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal rata2 Telford t 0.150
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilangan - Batu Sap Pinang Fh1 1.20
Faktor kehilangan - PASIR Fh2 1.20
8 Komposisi campuran Lapen (spesifikasi) :
- Batu Sap Pinang Ak 60.00
1. BAHAN
1.a. Batu kong (M03) 1.2000
ITEM PEMBAYARAN NO. : 5.7 (3)
JENIS PEKERJAAN : Lapisan Batu Shape Pinang
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HA
3. TENAGA
Produksi Telford / jam = Q1 8.57
Produksi Telford/ hari = Q1 x Tk Qt 60.00
Kebutuhan tenaga :
- Pekerja P 74.00
- Mandor M 2.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 8.6333
- Mandor = (Tk x M) / Qt (L03) 0.2333
SATUAN KETERANGAN
KM
M
-
jam
% Gradasi harus
% memenuhi Spec.
%
ton/m3
M3
M3 (lepas)
- kondisi sedang
-
menit panduan
M3
jam
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
jam
Berlanjut ke hal. berikut
Analisa EI-511
SATUAN KETERANGAN
M
M
-
KM/jam
lintasan 1 x pp
menit
menit
menit
M3
jam
KM/jam
M
lintasan
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Berlanjut ke hal. berikut
Analisa EI-511
SATUAN KETERANGAN
Analisa EI-512
SATUAN KETERANGAN
KM
M
jam
% Gradasi harus
% memenuhi
% Spesifikasi
ton/m3
M3
M3
- lepas
- kondisi sedang
menit panduan
menit
M3
jam
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
jam
Berlanjut ke hal. berikut
Analisa EI-512
SATUAN KETERANGAN
M
M
-
KM/jam
lintasan 1 x pp
menit
menit
menit
M3
jam
KM/jam
M
lintasan
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Berlanjut ke hal. berikut
Analisa EI-512
SATUAN KETERANGAN
Analisa EI-521
SATUAN KETERANGAN
KM
M
-
Jam
ton/M3
M3 Agregat lepas
M3 (lepas)
- Pemuatan sedang
-
menit panduan
menit
M3
Jam
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
Jam
Berlanjut ke hal. berikut
Analisa EI-521
SATUAN KETERANGAN
M
M
-
KM / Jam
lintasan 1 x pp
menit
menit
menit
M3
Jam
KM / Jam
M
lintasan
-
M3
Jam
M3
M3
liter/menit
-
M3
Jam
Lump Sum
M3 / Jam
M3
orang
orang
Jam
Jam
Berlanjut ke hal. berikut
Analisa EI-521
SATUAN KETERANGAN
Analisa EI-571
SATUAN KETERANGAN
KM
M
Jam
-
-
m3 0.8333333333
m3 0.3333333333
m3 0.5
ton / M3
ton / M3
M3
M3
M3
Km / Jam
M
lintasan 2 fase @ 6 lintas
-
M3
Jam
Berlanjut ke halaman berikut
Analisa EI-571
SATUAN KETERANGAN
set
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-572
SATUAN KETERANGAN
KM
M
Jam
-
-
m3
ton / M3
ton / M3
M3
Berlanjut ke halaman berikut
Analisa EI-572
SATUAN KETERANGAN
set
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-573
SATUAN KETERANGAN
KM
M
Jam
-
-
m3
ton / M3
ton / M3
M3
Berlanjut ke halaman berikut
Analisa EI-573
SATUAN KETERANGAN
set
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-511
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 5.1 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0085 315,492.82
2. Dump Truck (E08) jam 0.5043 166,208.23
3. Motor Grader (E13) jam 0.0039 339,348.23
4. Tandem Roller (E17) jam 0.0357 340,952.26
5. Water Tanker (E23) jam 0.0141 159,158.80
6. Alat Bantu Ls 1.0000 0.00
7.
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 5.1 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. B TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0085 315,492.82
2. Dump Truck (E08) jam 0.4861 166,208.23
3. Motor Grader (E13) jam 0.0039 339,348.23
4. Tandem Roller (E17) jam 0.0178 340,952.26
5. Water Tanker (E23) jam 0.0141 159,158.80
6. Alat Bantu Ls 1.0000 0.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 5.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas C TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 5.7 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Fondasi Telford TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 5.7 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapisan Batu Kong TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 5.7 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapisan Batu Shape Pinang TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
RGA SATUAN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
373.79
73.42
447.21
396,586.12
396,586.12
2,680.18
83,816.12
1,324.99
12,171.43
2,237.17
0.00
102,229.89
499,263.22
49,926.32
549,189.55
ja dan Peralatan, volume dan/atau ukuran
RGA SATUAN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
373.79
73.42
447.21
342,739.48
342,739.48
2,680.18
80,786.62
1,324.99
6,085.72
2,237.17
0.00
93,114.68
436,301.37
43,630.14
479,931.51
ja dan Peralatan, volume dan/atau ukuran
RGA SATUAN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
564.42
110.87
675.29
314,992.42
314,992.42
4,047.07
70,824.08
1,324.99
12,171.43
2,237.17
0.00
90,604.75
406,272.46
40,627.25
446,899.70
ja dan Peralatan, volume dan/atau ukuran
RGA SATUAN
Err:509
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
72,600.00
3,025.00
75,625.00
186,416.67
76,100.00
26,050.00
288,566.67
5,552.55
3,800.00
9,352.55
373,544.21
37,354.42
410,898.63
ja dan Peralatan, volume dan/atau ukuran
RGA SATUAN
Err:509
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
54,266.67
2,016.67
56,283.33
176,040.00
176,040.00
3,800.00
3,800.00
236,123.33
23,612.33
259,735.67
ja dan Peralatan, volume dan/atau ukuran
RGA SATUAN
Err:509
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
54,266.67
2,016.67
56,283.33
234,600.00
234,600.00
3,800.00
3,800.00
294,683.33
29,468.33
324,151.67
ja dan Peralatan, volume dan/atau
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As
- Kerosene K
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1
- Kerosene D2
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan V
Kapasitas pompa aspal pas
Faktor effisiensi kerja Fa
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
ITEM PEMBAYARAN NO. : 6.1 (1)
JENIS PEKERJAAN : Lapis Resap Pengikat
SATUAN PEMBAYARAN : Liter
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran (Spesifikasi) :
- Aspal Pen 60 atau Pen 80 As
- Kerosene K
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1
- Kerosene D2
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Kecepatan penyemprotan v
Kapasitas pompa aspal pas
Faktor effesiensi kerja Fa
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q4
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L
6 Jam kerja efektif per-hari Tk
7 Berat Isi Agregat Chipping : padat Bip
lepas Bil
8 Faktor Kehilangan Fh
9 Tebal SBST t
10 Lapisan SBST terdiri dari (spesifikasi) :
- Menggunakan material ukuran Ld
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor Efisiensi alat Fa
Waktu Siklus : V - loading Ts1
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L02)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L
6 Jam kerja efektif per-hari Tk
7 Berat Isi Agregat Chipping : padat Bip
lepas Bil
8 Faktor Kehilangan Fh
9 Tebal DBST t
10 Lapisan DBST terdiri dari (spesifikasi) :
- Lapisan pertama ukuran normal = 13 mm
- Lapis kedua ukuran normal Ld
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus V - Loading Ts1
Ts1
3. TENAGA
Produksi menentukan : Wheel Loader Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L
4 Jam kerja efektif per-hari Tk
5 Faktor kehilangan bahan Fh
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As
- Kerosene K
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1
- Kerosene D2
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc
2. ALAT
2.a. APHALT DISTRIBUTOR (E41)
Lebar penyemprotan b
Faktor efisiensi kerja Fa
Kapasitas pompa aspal pas
3. TENAGA
Produksi menentukan : ASPHALT DISTIRBUTOR Q1
Produksi / hari = Tk x Q1 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis Latasir padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilanganmaterial : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran SS Kelas B
- Pasir Kasar M01a PK
- Pasir Halus M01c PH
- Semen FF
- Asphalt As
11 Berat Isi bahan :
- Latasir (SS) Kelas B D1
- Pasir Kasar D2
- Pasir Halus D3
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Pasir Kasar = (PK x (D1 x tM3) x Fh1) : D2 (M01d)
1.b. Pasir Halus = (PH x (D1 x tM3) x Fh1) : D3 (M01c)
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05)
1.d. Aspal = (As x (D1 x tM3) x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
D1 x t
Koefisien Alat / M2 = 1 : Q2 (E01)
Kap.Prod. / jam = V x Fa x 60 Q4
D1 x t x Ts2
Kap.Prod./jam = (v x 1000) x b x Fa Q7
n
Koefisien Alat / M2 = 1 : Q7 (E18)
ITEM PEMBAYARAN NO. : 6.3 (2)
JENIS PEKERJAAN : Latasir Kelas B (SS-B)
SATUAN PEMBAYARAN : M2
3. TENAGA
Produksi menentukan : AMP Q2
Produksi Latasir / hari = Tk x Q5 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L
5 Tebal Lapis (HRS) padat t
6 Jam kerja efektif per-hari Tk
7 Faktor kehilangan material : - Agregat Fh1
- Aspal Fh2
8 Berat isi Agregat (padat) Bip
9 Berat Isi Agregat (lepas) Bil
10 Komposisi campuran HRS
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15
- Agregat Pecah Mesin 0 - 5 mm 0-5
- Pasir Halus PH
- Semen FF
- Asphalt As
11 Berat Isi bahan :
- HRS-WC D1
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2
- Agr Pch Mesin 0 - 5 mm D3
- Pasir Halus D4
12 Jarak Stock pile ke Cold Bin l
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x (D1 x tM3) x Fh1) : D2 (M79)
1.b. Agr 0-5 = ("0-5" x (D1 x tM3) x Fh1) : D3 (M78)
1.c. Pasir Halus = (PH x (D1 x tM3) x Fh1) : D4 (M01c)
1.d. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05)
1.e. Aspal = (As x (D1 x tM3) x Fh2) x 1000 (M10)
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V
Faktor bucket Fb
Faktor efisiensi alat Fa
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf
- Kecepatan kembali rata rata Vr
- Muat ke Bin = (l x 60) / Vf T1
- Kembali ke Stock pile = (l x 60) / Vr T2
- Lain - lain (waktu pasti) T3
Ts1
Kap.Prod. / jam = V x Fa Q2
D1 x t
Koefisien Alat / M2 = 1 : Q2 (E01)
Kap.Prod. / jam = V x Fa x 60 Q4
D1 x t x Ts2
Kap.Prod./jam = (v x 1000) x b x Fa Q7
n
Koefisien Alat / M2 = 1 : Q7 (E18)
ITEM PEMBAYARAN NO. : 6.3 (3)
JENIS PEKERJAAN : Lataston Lapis Aus (HRS-WC)
SATUAN PEMBAYARAN : M2
3. TENAGA
Produksi menentukan : A M P Q2
Produksi HRS / hari = Tk x Q2 Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01)
- Mandor = (Tk x M) / Qt (L03)
8.73 KM
7.00 Jam
1.03 -
64 % terhadap volume
36 % terhadap volume
1.03 Kg / liter
0.80 Kg / liter
1.03 liter
0.6790 Kg.
0.3708 Liter
3.00 M
30.00 m/menit Asumsi
100 liter/menit Panduan
0.80 Sedang
4,800.00 liter
0.0002 Jam
4,800.00 liter
0.0002 Jam
4,800.00 liter
33,600.00 liter
10.00 orang
2.00 orang
0.0021 Jam
0.0004 Jam
Analisa EI-612
8.73 KM
7.00 Jam
1.03 -
80 % terhadap volume
20 % terhadap volume
1.03 Kg / liter
0.80 Kg / liter
1.03 liter
0.8487 Kg
0.2060 liter
3.00 M
30.00 M/menit asumsi
100 liter/menit Panduan
0.80 sedang
4,800.00 liter
0.0002 Jam
4,800.00 liter
0.0002 Jam
4,800.00 liter
33,600.00 liter
10.00 orang
2.00 orang
0.0021 Jam
0.0004 Jam
8.73 Km
7.00 Jam
1.47 -
1.27
1.05
1.50 Cm
1.30 Cm
23 Kg.
1.50 M3
0.85 -
0.83 -
0.45 menit lihat tabel
V - Loading
8,126.85 M2
0.00012 Jam
3.50 ton
0.80 - kondisi sedang
20.00 KM / Jam
30.00 KM / Jam
1.36 menit
26.18 menit
2.00 menit
17.45 menit
46.98 menit
162.17 M2
0.0062 Jam
1,032.31 M2
0.00097 Jam
Lump Sum
8,126.85 M2
56,887.94 M2
20.00 orang
1.00 orang
0.0025 Jam
0.0001 Jam
8.73 KM
7.00 jam
1.47 -
1.27
1.05
2.50 Cm
6.00 mm
6.70 -
99.40 m2/m3
0.0101 M3
0.0148 M3
0.0088 M3
35 Kg.
1.50 M3
0.85 -
0.83 -
0.45 menit
0.45 menit
4,876.11 M2
0.0002 Jam
3.50 ton
0.80 - kondisi sedang
20.00 KM / Jam
30.00 KM / Jam
1.17 menit
26.18 menit
2.00 menit
17.45 menit
46.80 menit
97.69 M2 / Jam
0.0102 Jam
516.16 M2
0.0019 Jam
Lump Sum
4,876.11 M2
34,132.76 M2
20.00 orang
1.00 orang
0.0041 Jam
0.0002 Jam
Analisa EI-623
8.73 KM
7.00 Jam
1.03 -
1.03 Kg / Ltr
0.80 Kg / Ltr
1.03 liter
1.02 Kg
0.041 liter
3.00 M
0.80 -
100 liter/menit
4,800.00 liter
0.0002 Jam
4,800.00 liter
0.0002 Jam
4,800.00 liter
33,600.00 liter
10.00 orang
2.00 orang
0.0021 Jam
0.0004 Jam
Analisa EI-632
8.73 KM
0.020 M Tabel 6.3.1 (2)
7.00 Jam
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3
2.20 ton / M3
1.46 ton / M3
1.46 ton / M3
0.05 km
0.0139 M3
0.0139 M3
1.386 Kg
4.079 Kg
1.50 M3 panduan
0.85 -
0.83 -
2,293.12 M2
0.0004 Jam
Berlanjut ke hal. berikut.
Analisa EI-632
565.91 M2
0.0018 Jam
565.91 M2
0.0018 Jam
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
61.46 M2
0.0163 Jam
0.0013 Jam
1.50 Km / Jam
1.48 M
2.00 lintasan
0.83 -
921.30 M2
0.0011 Jam
2.50 KM / jam
1.99 M
4.00 lintasan
0.83 -
1,032.31 M2
0.0010 Jam
Lump Sum
565.91 M2
3,961.36 M2
7.00 orang
1.00 orang
0.0124 Jam
0.0018 Jam
Analisa EI-633
8.73 KM
0.03 M
7.00 Jam
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3
2.23 ton / M3
1.42 ton / M3
1.57 ton / M3
1.46 ton / M3
0.05 km
0.0163 M3
0.0103 M3
0.0166 M3
1.5454 Kg
5.0302 Kg
1.50 M3 panduan
0.85 -
0.83 -
1,528.74 M2
0.0007 Jam
372.20 M2
0.0027 Jam
372.20 M2
0.0027 Jam
3.50 ton
0.80 -
20.00 KM / Jam
30.00 KM / Jam
1.00 ton
1.00 menit
3.50 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
40.42 M2
0.0247 Jam
0.0013 Jam
1.50 Km / Jam
1.48 M
6.00 lintasan 2 Awal & 4 Akhir
0.83 -
307.10 M2
0.0033 Jam
2.50 KM / jam
1.99 M
6.00 lintasan
0.83 -
688.21 M2
0.0015 Jam
Lump Sum
372.20 M2
2,605.38 M2
7.00 orang
1.00 orang
0.0188 Jam
0.0027 Jam
Analisa EI-634
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.1 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Resap Pengikat TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.1 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lapis Perekat TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Agregat Penutup BURTU TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Agregat Penutup BURDA TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.2 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Bahan Aspal untuk Pekerjaan Pelabura TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.3 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Latasir Kelas B (SS-B) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0004 315,492.82
2. AMP E01 Jam 0.0018 2,122,130.91
3. Genset E12 Jam 0.0018 280,335.99
4. Dump Truck E08 Jam 0.0163 166,208.23
5. Asphalt Finisher E02 Jam 0.0013 151,308.53
6. Tandem Roller E17 Jam 0.0011 340,952.26
7 P. Tyre Roller E18 Jam 0.0010 351,852.69
8 Alat Bantu Ls 1.0000
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.3 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Lataston Lapis Aus (HRS-WC) TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0007 315,492.82
2. AMP E01 Jam 0.0027 2,122,130.91
3. Genset E12 Jam 0.0027 280,335.99
4. Dump Truck E08 Jam 0.0247 166,208.23
5. Asphalt Finisher E02 Jam 0.0013 151,308.53
6. Tandem Roller E17 Jam 0.0033 340,952.26
7 P. Tyre Roller E18 Jam 0.0015 351,852.69
8 Alat Bantu Ls 1.0000 0.00
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
13.10
3.60
16.70
6,110.78
1,891.08
8,001.86
50.14
27.89
78.03
8,096.59
809.66
8,906.25
n, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
13.10
3.60
16.70
7,638.48
1,050.60
8,689.08
50.14
27.89
78.03
8,783.81
878.38
9,662.19
n, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
15.47
1.06
16.53
3,734.08
3,734.08
38.82
1,024.89
340.84
10.00
1,414.55
5,165.17
516.52
5,681.69
n, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
25.78
1.77
27.55
5,682.30
5,682.30
64.70
1,701.44
681.68
0.00
2,447.82
8,157.68
815.77
8,973.45
n, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
13.10
3.60
16.70
9,166.18
210.12
9,376.30
50.14
27.89
78.03
9,471.02
947.10
10,418.12
n, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
77.75
15.27
93.02
725.40
725.40
762.30
36,709.20
38,922.31
137.58
3,749.95
495.37
2,704.35
192.91
370.08
340.84
0.00
7,991.08
47,006.41
4,700.64
51,707.05
n, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
118.22
23.22
141.44
5,264.66
3,491.62
864.81
849.96
45,271.90
55,742.96
206.37
5,701.63
753.19
4,111.84
192.91
1,110.23
511.26
0.00
12,587.43
68,471.83
6,847.18
75,319.01
n, volume dan/atau ukuran
AN
ITEM PEMBAYARAN NO. : 6.4 (1)
JENIS PEKERJAAN : Lasbutag
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SAT
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Pek. ini tdk. termasuk Bitumen Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal LASBUTAG t 3.00 Cm
9 Lasbutag terdiri dari (spesifikasi) :
- Agregat Kasar CA 30.00 %
- Pasir Ps 49.50 %
- Asbuton Asb 16.00 %
- Peremaja, terdiri atas : Md 4.50 %
- Bunker Oil (BO) Bo 47.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 15.00 %
- Bahan Anti Stripping (jarang digunakan) As 0.00 %
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Lasbutag D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
Berlanjut ke hal. be
3. TENAGA
Produksi menentukan : ASPHALT FINISHER Q5 3,213.00 M2
Produksi / hari = Tk x Q5 Qt 22,491.00 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0062 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 1.50 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar (umumnya tidak digunakan) CA 0.00 %
- Pasir Ps 73.00 %
- Asbuton Asb 21.00 %
- Peremaja, terdiri atas : Md 6.00 %
- Bunker Oil (BO) Bo 44.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 18.00 %
- Bahan Anti Stripping As 0.00 %
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.85 -
Waktu Siklus : Ts1 0.45 menit
Berlanjut ke hal. be
Berlanjut ke hal. be
3. TENAGA
Produksi menentukan : Asphal Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 2.00 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar CA 14.00 %
- Pasir Ps 63.00 %
- Asbuton Asb 18.00 %
- Peremaja, terdiri atas : Md 5.00 %
- Bunker Oil (BO) Bo 44.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 18.00 %
- Bahan Anti Stripping As 0.00 %
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1 0.45 menit
Berlanjut ke hal. be
Berlanjut ke hal. be
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1. BAHAN
2 ALAT
3. TENAGA
I. ASUMSI
1 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
2 Jam kerja efektif per-hari Tk 7.00 Jam
3 Kandungan Bitumen dalam Bunker Oil (BO) Bbo 80.00 %
4 Kandungan Bitumen dalam Aspal Semen Bas 100.00 %
5 Kandungan Bitumen dalam Kerosene Bk 0.00 %
6 Proporsi Peremaja (modifier Lasbutag) :
- Bunker Oil (BO) Bo 47.00 %
- Aspal Semen Asp 38.00 %
- Minyak Tanah Mt 15.00 %
- Bahan Anti Stripping (umumnya tidak digunakan) As 0.00 %
7 Berat Isi bahan : - Modifier D1 0.99 T/m3
- Bunker Oil (BO) D2 0.97 T/m3
- Aspal Semen D3 1.03 T/m3
- Minyak Tanah D4 0.80 T/m3
8 Penyiapan Peremaja dilaksanakan di Base Camp
1.a Bunker Oil (BO) = (1000:Bit) x Bp1 x 1.01 : D2 (M54) 647.3300 Liter
1.b Aspal Semen = (1000:Bit) x Bp2 x 1.01 (M10) 507.6720 Kg
1.c Minyak Tanah = (1000:Bit) x Bp3 x 1.01 : D3 (M11) 250.4960 Liter
2 ALAT
Berlanjut ke hal. be
3. TENAGA
Produksi menentukan : Liquid Asphalt Mixer Q1 1.26 Ton
Produksi / hari = Tk x Q1 Qt 8.85 Ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
Berlanjut ke hal. berikut.
Analisa EI-641
KETERANGAN
lihat tabel
V - loading
Berlanjut ke hal. berikut.
Analisa EI-641
KETERANGAN
Lump Sum
Analisa EI-642
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
lihat tabel
V - loading
Analisa EI-642
KETERANGAN
Berlanjut ke hal. berikut.
Analisa EI-642
KETERANGAN
Lump Sum
Analisa EI-642
KETERANGAN
Analisa EI-643
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
lihat tabel
V - loading
Analisa EI-643
KETERANGAN
Berlanjut ke hal. berikut.
Analisa EI-643
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-644
KETERANGAN
Analisa EI-645
KETERANGAN
Total Modifier
Total Modifier
Total Modifier
Total Modifier
Berlanjut ke hal. berikut.
Analisa EI-645
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.4 (1)
JENIS PEKERJAAN : Lasbutag
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.4 (2)
JENIS PEKERJAAN : Latasbusir Kelas A
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.4 (3)
JENIS PEKERJAAN : Latasbusir Kelas B
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
1. Pekerja (L01) Jam 0.0064
2. Mandor (L02) Jam 0.0003
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.4 (4)
JENIS PEKERJAAN : Bitumen Asbuton
SATUAN PEMBAYARAN : Ton
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 6.4 (5)
JENIS PEKERJAAN : Bitumen Bahan Peremaja
SATUAN PEMBAYARAN : Ton
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
NTUK
NG HARGA SATUAN
…………………
……………………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 39.13
8,642.86 2.69
339,300.00 3,825.61
52,100.00 969.26
315,492.82 72.85
166,208.23 3,875.96
351,852.69 277.68
340,952.26 279.45
151,308.53 47.09
68,144.17 267.23
0.00 0.00
9,656.94
965.69
10,622.64
a dan Peralatan, volume dan/atau ukuran
NTUK
NG HARGA SATUAN
…………………
……………………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 40.07
8,642.86 2.75
52,100.00 714.70
JUMLAH HARGA BAHAN 714.70
315,492.82 35.57
166,208.23 1,944.54
351,852.69 277.68
340,952.26 279.45
151,308.53 48.23
68,144.17 136.84
0.00 0.00
3,479.83
347.98
3,827.81
a dan Peralatan, volume dan/atau ukuran
NTUK
NG HARGA SATUAN
…………………
……………………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 40.07
8,642.86 2.75
339,300.00 1,190.19
52,100.00 822.40
315,492.82 48.57
166,208.23 2,607.61
351,852.69 277.68
340,952.26 279.45
151,308.53 48.23
68,144.17 182.45
0.00 0.00
5,499.39
549.94
6,049.33
a dan Peralatan, volume dan/atau ukuran
NTUK
NG HARGA SATUAN
…………………
……………………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
325,000.00 1,665,625.00
1,665,625.00
166,562.50
1,832,187.50
a dan Peralatan, volume dan/atau ukuran
Analisa EI-645
NTUK
NG HARGA SATUAN
…………………
……………………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 49,722.70
8,642.86 6,836.87
3,000.00 1,941,989.85
9,000.00 4,569,047.62
5,100.00 1,277,529.76
JUMLAH HARGA BAHAN 7,788,567.24
23,357.68 18,476.93
7,863,603.74
786,360.37
8,649,964.11
a dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 365 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.45 -
9 Perbandingan Camp. 21.8705035971 : Semen Sm 456.0 Kg/M3
30.551558753 : Pasir Ps 637.0 Kg/M3
47.5779376499 : Agregat Kasar Kr 992.0 Kg/M3
10 Berat Isi : 100
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 469.680 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5145 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.4000 M3
1.e. Paku (M18) 3.2000 Kg
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.8072 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 1,787,883.57 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 350 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.45 -
9 Perbandingan Camp. : Semen Sm 456.0 Kg/M3
: Pasir Ps 631.0 Kg/M3
: Agregat Kasar Kr 992.0 Kg/M3
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 469.680 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5097 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.2000 M3
1.e. Paku (M18) 1.6000 Kg
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.1044 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 1,487,259.54 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 340 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
9 Perbandingan Camp. : Semen Sm 410.0 Kg/M3
: Pasir Ps 670.0 Kg/M3
: Agregat Kasar Kr 992.0 Kg/M3
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 422.300 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5412 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.2000 M3
1.e. Paku (M18) 1.6000 Kg
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.1044 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 1,422,342.90 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 300 Kg/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 327.540 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5024 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.9053 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.1000 M3
1.e. Paku (M18) 0.8000 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 300.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 6.15 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.1379 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.2758 jam
- Pekerja = (Tk x P) : Qt (L01) 2.2758 jam
Rp. 1,122,602.4 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 300 Kg/M3
1. BAHAN
1.a. Semen (PC) = Sm x 0.7 x 1.03 (M12) 229.278 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 0.7 x 1.05 (M01) 0.3517 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 0.7 x 1.05 (M03) 0.6337 M3
1.d. Batu Belah = {(Kr/1000 x D1) : D4} x 0.30 * 1.05 (M06) 0.6518 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 300.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 6.00 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.1667 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.1667 jam
- Pekerja = (Tk x P) : Qt (L01) 14.0000 jam
Rp. 985,439.5 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 250 Kg/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 311.060 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5113 M3
1.c. Kerikil Pecah = (Kr/1000 : D4) x 1.05 (M03) 0.9053 M3
1.e. Kayu Perancah (M19) 0.0500 M3
1.f Paku (M18) 0.4000 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 300.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 6.00 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.1667 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.3333 jam
- Pekerja = (Tk x P) : Qt (L01) 2.3333 jam
Rp. 1,027,505.6 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a) 1.1000 Kg
1.b. Kawat beton (M14) 0.0025 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 18,469.00 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Polos) U32 (M57a) 1.1000 Kg
1.b. Kawat beton (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 11,899.25 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Ulir) D32 (M39b) 1.1000 Kg
1.b. Kawat beton (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 12,625.25 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Ulir) D39 (M57b) 1.0500 Kg
1.b. Kawat beton (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 11,495.00 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Ulir) D48 (M57c) 1.1000 Kg
1.b. Kawat beton (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 12,625.25 / Kg
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi Jembatan
3 Bahan dasar (besi) dan kawat las diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (M57c) 1.1000 Kg
1.b. Kawat Las (M14) 0.0200 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0700 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.2100 jam
Rp. 39,750.15 / Kg
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.1 (3)
JENIS PEKERJAAN : Beton K-350
SATUAN PEMBAYARAN : M3
PERKIRAAN
Berdasarkan NO. KOMPONEN SATUAN KUANTITAS
JMF & sesuai
dgn Spesifikasi
A. TENAGA
JUMLAH HARGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA PE
KETERANGAN
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
945
1210
Analisa EI-714
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.1 (4)
JENIS PEKERJAAN : Beton K-300
SATUAN PEMBAYARAN : M3
PERKIRAAN
Berdasarkan NO. KOMPONEN SATUAN KUANTITAS
JMF & sesuai
dgn Spesifikasi
A. TENAGA
JUMLAH HARGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA PE
KETERANGAN
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
945
1210
Analisa EI-715
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.1 (5)
JENIS PEKERJAAN : Beton K-250
SATUAN PEMBAYARAN : M3
PERKIRAAN
Berdasarkan NO. KOMPONEN SATUAN KUANTITAS
JMF & sesuai
dgn Spesifikasi
A. TENAGA
JUMLAH HARGA
B. BAHAN
JUMLAH HARG
C. PERALATAN
JUMLAH HARGA PE
KETERANGAN
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
Analisa EI-716
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.1 (6)
JENIS PEKERJAAN : Beton K-175
SATUAN PEMBAYARAN : M3
PERKIRAAN
Berdasarkan NO. KOMPONEN SATUAN KUANTITAS
JMF & sesuai
dgn Spesifikasi
A. TENAGA
JUMLAH HARGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA PE
KETERANGAN
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
Analisa EI-717
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.1 (7)
JENIS PEKERJAAN : Beton Siklop K175
SATUAN PEMBAYARAN : M3
K-175
PERKIRAAN
Berdasarkan NO. KOMPONEN SATUAN KUANTITAS
JMF & sesuai
dgn Spesifikasi
A. TENAGA
JUMLAH HARGA
B. BAHAN
JUMLAH HARG
C. PERALATAN
JUMLAH HARGA PE
KETERANGAN
1 Tk = 20 m3 btn
Analisa EI-718
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.1 (8)
JENIS PEKERJAAN : Beton K125
SATUAN PEMBAYARAN : M3
PERKIRAAN
Berdasarkan NO. KOMPONEN SATUAN KUANTITAS
JMF & sesuai
dgn Spesifikasi
A. TENAGA
JUMLAH HARGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA PE
KETERANGAN
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
Analisa EI-731
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.3 (1)
JENIS PEKERJAAN : Baja Tulangan 24 Polos
SATUAN PEMBAYARAN : Kg
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
JUMLAH HARGA
B. BAHAN
JUMLAH HARG
C. PERALATAN
JUMLAH HARGA PE
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.3 (2)
JENIS PEKERJAAN : Baja Tulangan 32 Polos
SATUAN PEMBAYARAN : Kg
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
JUMLAH HARGA
B. BAHAN
JUMLAH HARG
C. PERALATAN
JUMLAH HARGA PE
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.3 (3)
JENIS PEKERJAAN : Baja Tulangan 32 Ulir
SATUAN PEMBAYARAN : Kg
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
JUMLAH HARGA
B. BAHAN
JUMLAH HARG
C. PERALATAN
JUMLAH HARGA PE
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.3 (4)
JENIS PEKERJAAN : Baja Tulangan 39 Ulir
SATUAN PEMBAYARAN : Kg
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
JUMLAH HARGA
B. BAHAN
JUMLAH HARG
C. PERALATAN
JUMLAH HARGA PE
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.3 (5)
JENIS PEKERJAAN : Baja Tulangan 48 Ulir
SATUAN PEMBAYARAN : Kg
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
JUMLAH HARGA
B. BAHAN
JUMLAH HARG
C. PERALATAN
JUMLAH HARGA PE
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
: KONTRAK
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 7.3 (6)
JENIS PEKERJAAN : Anyaman Kawat Yang Dilas (Welded Wire Mesh)
SATUAN PEMBAYARAN : Kg
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
JUMLAH HARGA
B. BAHAN
JUMLAH HARG
C. PERALATAN
JUMLAH HARGA PE
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 5,048.77
7,857.14 14,199.66
8,642.86 867.76
1,280.00 601,190.40
52,100.00 26,805.45
339,300.00 252,439.20
1,203,200.00 481,280.00
16,800.00 53,760.00
459,571.81 46,141.75
422,086.14 133,483.44
159,158.80 10,132.28
0.00 0.00
1,625,348.70
162,534.87
1,787,883.57
ga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 5,048.77
7,857.14 8,677.57
8,642.86 867.76
1,280.00 601,190.40
52,100.00 26,552.97
339,300.00 252,439.20
1,203,200.00 240,640.00
16,800.00 26,880.00
459,571.81 46,141.75
422,086.14 133,483.44
159,158.80 10,132.28
0.00 0.00
1,352,054.12
135,205.41
1,487,259.54
ga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 5,048.77
7,857.14 8,677.57
8,642.86 867.76
1,280.00 540,544.00
52,100.00 28,194.12
339,300.00 252,439.20
1,203,200.00 240,640.00
16,800.00 26,880.00
459,571.81 46,141.75
422,086.14 133,483.44
159,158.80 10,122.40
0.00
1,293,039.00
129,303.90
1,422,342.90
ga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 14,304.84
7,857.14 17,881.05
8,642.86 9,834.58
1,280.00 419,251.20
52,100.00 26,174.24
339,300.00 307,151.33
1,203,200.00 120,320.00
16,800.00 13,440.00
68,144.17 77,540.22
159,158.80 8,950.18
57,000.00 5,700.00
1,020,547.63
102,054.76
1,122,602.39
ga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 88,000.00
7,857.14 9,166.67
8,642.86 10,083.33
1,280.00 293,475.84
52,100.00 18,321.97
339,300.00 215,005.93
223,700.00 145,803.19
68,144.17 77,540.22
159,158.80 6,265.13
23,281.60 26,491.78
57,000.00 5,700.00
895,854.05
89,585.40
985,439.45
ga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 14,666.67
7,857.14 18,333.33
8,642.86 10,083.33
1,280.00 398,156.80
52,100.00 26,637.13
339,300.00 307,151.33
1,203,200.00 60,160.00
16,800.00 6,720.00
68,144.17 77,540.22
159,158.80 8,947.22
57,000.00 5,700.00
934,096.03
93,409.60
1,027,505.63
ga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 660.00
7,857.14 275.00
8,642.86 302.50
14,100.00 15,510.00
17,000.00 42.50
0.00 0.00
16,790.00
1,679.00
18,469.00
ga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 660.00
7,857.14 275.00
8,642.86 302.50
8,400.00 9,240.00
17,000.00 340.00
0.00 0.00
10,817.50
1,081.75
11,899.25
ga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 660.00
7,857.14 275.00
8,642.86 302.50
9,000.00 9,900.00
17,000.00 340.00
0.00 0.00
11,477.50
1,147.75
12,625.25
ga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 660.00
7,857.14 275.00
8,642.86 302.50
8,450.00 8,872.50
17,000.00 340.00
0.00 0.00
10,450.00
1,045.00
11,495.00
ga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 660.00
7,857.14 275.00
8,642.86 302.50
9,000.00 9,900.00
17,000.00 340.00
0.00 0.00
11,477.50
1,147.75
12,625.25
ga Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 1,320.00
7,857.14 550.00
8,642.86 302.50
9,000.00 9,900.00
1,203,200.00 24,064.00
0.00 0.00
36,136.50
3,613.65
39,750.15
ga Kerja dan Peralatan, volume dan/atau ukuran
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Beton & tulangan sesuai analisa item pekerjaan ybs.
3 Tiang Pcg. dibuat di Base Camp & diangkut ke lokasi pek.
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 14.10 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Panjang Tiang (sesuai kebutuhan) Lt 7.96 M
7 Ukuran tiang pancang (sesuai kebutuhan) Uk 0.40 M
8 Kebutuhan baja tulangan : 250 Kg/m3 Mb 250.0 Kg/M3
1. BAHAN
1.a. Beton K 400 (EI-712) 1.0000 M3
1.b. Baja Tulangan = Mb (EI-732) 250.0 Kg
1.c. Plat Baja utk Sepatu tiang/sambungan (t=16mm) (M48) 4.5038 Kg
1.d. Kayu Bekisting tambahan = {Uk x 1.0 x 4 x 0.02} (M19) 0.0320 M3
1.e. Paku (M18) 0.3200 Kg
2. ALAT
2.a TRAILER (E29)
Kapasitas bak sekali muat V 7.00 batang
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 42.30 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 28.20 menit
- Lain-Lain (tunggu, bongkar dan muat) T3 140.00 menit
Ts1 210.50 menit
Berlanjut ke h
ITEM PEMBAYARAN NO. : 7.6 (9)
JENIS PEKERJAAN : Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran / diameter …..
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.4000 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.8000 jam
- Pekerja = (Tk x P) : Qt (L01) 5.6000 jam
Rp. 5,051,341.81 / M3
KETERANGAN
Lumpsum
SA HARGA SATUAN
Lanjutan
KETERANGAN
ITEM PEMBAYARAN NO. : 7.16.1
JENIS PEKERJAAN : Perkerasan Jalan Beton
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal Lapis perkerasan beton padat t 0.30 m
7 Kadar Semen Minimum (Spesifikasi) Ks 365 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
10 Perbandingan Camp. : Semen Sm 400.0 %
: Pasir Ps 791.0 %
: Agregat Kasar Kr 1,077.0 %
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7028 jam
- Pekerja = (Tk x P) : Qt (L01) 1.4056 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 1,629,627.03 / M3
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Berdasarkan 1. Pekerja (L01) jam 1.4056
JMF & sesuai 2. Tukang (L02) jam 0.7028
dgn Spesifikasi 3. Mandor (L03) jam 0.1506
B. BAHAN
1. Semen (M12) Kg 410.0000
2 Pasir (M01a) M3 0.6237
3 Agregat Kasar (M03) M3 0.7885
4 Baja Tulangan Polos (M39a) Kg 15.8750
5 Joint Sealent (M94) Kg 0.9900
6 Cat Anti Karat (M95) Kg 0.0200
7 Expansion Cap (M96) M2 0.1700
8 Polytene 125 mikron (M97) Kg 0.4375
9 Curing Compound (M98) Ltr 0.8700
10 Multiplex 12 mm (M73) Lbr 0.1600
11 Kayu Acuan (M99) M3 0.0960
12 Paku (M18) Kg 1.0240
13 Additive (M67a) Ltr 0.9139
JUMLAH HARGA BAH
C. PERALATAN
1 Wheel Loader E15 jam 0.0244
2 Batching Plant E43 jam 0.0502
3 Truck Mixer E49 jam 0.2437
4 Con. Vibrator E20 jam 0.0502
5 Water Tank Truck E23 jam 0.0211
6 Conc. Paver E42 jam 0.0074
7 Alat Bantu Ls 1.0000
8
KETERANGAN
945
KETERANGAN
Analisa EI-7.16.1
NDAR UNTUK
G-MASING HARGA SATUAN
…………………
……………………………………..
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,285.71 8,835.34
7,857.14 5,522.09
8,642.86 1,301.64
1,280.00 524,800.00
52,100.00 32,493.37
339,300.00 267,544.11
14,100.00 223,837.50
34,100.00 33,759.00
35,750.00 715.00
6,050.00 1,028.50
19,250.00 8,421.88
38,500.00 33,495.00
181,500.00 29,040.00
1,203,200.00 115,507.20
16,800.00 17,203.20
40,000.00 36,556.80
JUMLAH HARGA BAHAN 1,324,401.55
315,492.82 7,701.61
459,571.81 23,070.87
422,086.14 102,869.07
23,281.60 1,168.75
159,158.80 3,355.76
437,322.26 3,252.43
0.00 0.00
0.025
ITEM PEMBAYARAN NO. : 8.1 (1)
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk Pek. Minor
SATUAN PEMBAYARAN : M3 URAIAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00
- Pasir Urug PU 30.00
9 Berat Isi Agregat (lepas) Bil 1.51
Faktor kehilangan - Agregat A Fh 1.05
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) ###
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45
TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 25.00
- Mandor M 1.00
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2124
- Mandor = (Tk x M) : Qt (L03) 0.0085
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
5 Tebal lapis agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00
- Sirtu St 64.00
9 Berat volume agregat (lepas) Bil 1.51
- Agregat B Fh 1.05
Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 15.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1274
- Mandor = (Tk x M) : Qt (L03) 0.0085
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
5 Tebal lapis Agregat padat t 0.15
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00
8 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu siklus Ts1
- Muat T1 0.45
Ts1 0.45
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi Agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
- Pekerja P 15.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1274
- Mandor = (Tk x M) : Qt (L03) 0.0085
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan material Agregat Fh 1.10
7 Komposisi campuran (taksiran) :
- Agregat Kasar Ak 85.00
- Agregat Halus Ah 15.00
8 Berat jenis bahan :
- Agregat D1 1.80
9 Berat isi padat Bip 1.81
10 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.83
Waktu Siklus Ts1
- Menunggu, dan lain lain T1 0.45
Ts1 0.45
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 98.09
Ts1 x (Bip/Bil)
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 98.09
Produksi Lapen / hari = Q1 x Tk Qt 686.66
Kebutuhan tenaga :
- Pekerja P 16.00
- Mandor M 1.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1631
- Mandor = (Tk x M) / Qt (L03) 0.0102
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
5 Tebal Lapis Hotmix padat untuk patching t 0.04
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilangan material : - Agregat Fh1 1.10
- Aspal Fh2 1.05
8 Komposisi campuran ATB :
- Coarse Agregat CA 55.00
- Fine Agregat FA 37.50
- Fraksi Filler FF 1.00
- Asphalt minimum 6 % As 6.50
9 Berat jenis bahan :
- ATB D1 2.30
- Coarse Agregat & Fine Agregat D2 1.80
- Fraksi Filler D3 2.00
- Asphalt D4 1.03
10 Jarak stock pile ke cold bin l 100.00
11 Faktor kembang Fk 1.20
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.83
Kecepatan maju (ke bin) Vf 15.00
Kecepatan kembali (ke stock pile) Vr 20.00
Waktu Siklus Ts1
- Muat = l x 60 + l x 60 T1 0.70
- Lain lain 1000 x Vf 1000 x Vr T2 0.75
Ts1 1.45
3. TENAGA
Produksi menentukan : AMP Q6 9.02
Produksi ATB / hari = Tk x Q6 Qt 63.15
Kebutuhan tenaga :
- Pekerja P 20.00
- Mandor M 2.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 2.2169
- Mandor = (Tk x M) / Qt (L03) 0.2217
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73
5 Tebal rata2 Lapen t 0.055
6 Jam kerja efektif per-hari Tk 7.00
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10
- Aspal Fh2 1.05
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00
- Agregat Pengunci Ap 25.00
- Aspal : - Paska Agregat Pokok As1 5.20
As2 94.55
9 Berat jenis bahan :
- Agregat D1 1.80
- Aspal D2 1.01
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50
Faktor bucket Fb 0.85
Faktor efisiensi alat Fa 0.83
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45
Ts1 0.45
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58
Produksi Lapen / hari = Q1 x Tk Qt 823.08
Kebutuhan tenaga :
- Pekerja P 20.00
- Mandor M 2.00
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701
- Mandor = (Tk x M) / Qt (L03) 0.0170
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1683
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 140.700
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 300.00
Faktor Efisiensi Alat Fa 0.83
Waktu siklus : Ts1
- Memuat T1 0.50
- Mengaduk T2 1.00
- Menuang T3 0.30
- Tunggu, dll. T4 0.20
Ts1 2.00
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 6.225
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 43.58
Kebutuhan tenaga : - Mandor M 2.00
- Pekerja P 12.00
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.3213
- Pekerja = (Tk x P) : Qt (L01) 1.9277
Rp. 1,415,472.36 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fh 1.10
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00
- Minyak Fluk / Pencair K 13.00
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03
- Minyak Fluk / Minyak Tanah (Kerosene) D2 0.80
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10
Aspal = As x Pc x D1 : 100 (M10) 0.99
Kerosene = K x Pc : 100 (M11) 0.14
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 500.00
Faktor Efisiensi Alat Fa 0.83
Kapasitas pompa aspal pas 55.00
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 3,012.90
Produksi / hari = Tk x Q1 Qt 21,090.30
Kebutuhan tenaga :
- Pekerja P 10.00
- Mandor M 1.00
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor pengembangan bahan Fk 1.20
6 Berat jenis bahan (lepas) D 1.60
II. URUTAN KERJA
1 Tanah yang dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan menggunakan pekerja
3 Selanjutnya pekerja memuat material hasil
galian kedalam Dump Truck
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh L 2.00
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus Ts2
- Muat T1 35.00
- Waktu tempuh isi = (L : v1) x 60 T2 6.00
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00
- Lain-lain T4 2.00
Ts2 47.00
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000
- Mandor = (Tk x M) : Qt (L03) 0.1000
Rp. 73,510.65 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang/baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor pengembangan bahan Fk 1.20
7 Tebal hamparan padat t 0.15
8 Hasil bongkaran per M2 luas area d 0.50
1. BAHAN
1a Bahan timbunan = 1 x Fk (M08) 1.20
2. ALAT
2.a DUMP TRUCK (E09)
Kapasitas bak V 10.00
Faktor Efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 menit T1 26.18
- Waktu tempuh kosong = (L : v2) x 60 menit T2 17.45
- Lain-lain (termasuk dumping setempat-setempat) T3 2.00
Ts2 45.63
Kap. Prod. / jam = V x Fa x 60 Q2 21.83
Ts2 x d
Koefisien Alat / M3 = 1 : Q2 (E09) 0.0458
TENAGA
Produksi pembersihan dan pembongkaran/hari Qt 500.00
Kebutuhan tenaga :
- Pekerja P 5.00
- Mandor M 1.00
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0700
- Mandor = (Tk x M) : Qt (L03) 0.0140
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 1 Pohon diameter 30-50 cm setara dengan volume Vp 3.00
6 Berat Jenis Kayu BjK 0.90
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus Ts2
- Muat T1 35.00
- Waktu tempuh isi = (L : v1) x 60 T2 6.00
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00
- Lain-lain T4 10.00
Ts 55.00
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 1 Pohon diameter 50 - 75 cm setara dengan volume Vp 5.00
6 Berat jenis kayu Bjk 0.90
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus Ts2
- Muat T1 35.00
- Waktu tempuh isi = (L : v1) x 60 T2 6.00
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00
- Lain-lain T4 10.00
Ts2 55.00
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 3.5000
- Mandor = (Tk x M) : Qt (L03) 0.3500
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 1 Pohon diameter > 75 cm setara dengan volume Vp 10.00
6 Berat jenis kayu Bjk 0.90
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00
Kecepatan rata-rata kosong v2 30.00
Waktu siklus Ts2
- Muat T1 35.00
- Waktu tempuh isi = (L : v1) x 60 T2 6.00
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00
- Lain-lain T4 15.00
Ts 60.00
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (gebalan rumput) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.00
5 Jam kerja efektif per-hari Tk 7.00
6 Faktor kehilangan bahan Fh 1.10
1. BAHAN
1.a. Gebalan Rumput = 1 M2 x Fh (M32) 1.1000
2. ALAT
2.a. ALAT BANTU
- Gerobak Dorong = 2 buah
- Tusuk Bambu = 5 buah / M2
- Pagar Tali = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 2.00
- Pekerja P 4.00
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700
- Tukang = (Tk x Tb) : Qt (L02) 0.1400
- Pekerja = (Tk x P) : Qt (L01) 0.2800
Rp. 8,046.50 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar (semak/perdu) diterima seluruhnya di lokasi pekerjaan
1. BAHAN
1.a. - Semak/perdu (M32) 1.10
1.b. - Tanah humus setebal 20 cm mxx 0.22
1.c. - Pupuk mxx 0.25
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 0.00
- Pekerja P 6.00
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700
- Tukang = (Tk x Tb) : Qt (L02) 0.0000
- Pekerja = (Tk x P) : Qt (L01) 0.4200
Rp. 7,804.50 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar pohon dan bahan lainnya diterima di lokasi pekerjaan
4 ukuran lubang 0,5 x 0,5 x 0,5 m
1. BAHAN
1.a. - pohon (M32) 1.00
1.b. - Tanah humus setebal 20 cm mxx 0.22
1.c. - Pupuk mxx 0.50
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00
Kebutuhan tenaga : - Mandor M 1.00
- Tukang Tb 0.00
- Pekerja P 6.00
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700
- Tukang = (Tk x Tb) : Qt (L02) 0.0000
- Pekerja = (Tk x P) : Qt (L01) 0.4200
Rp. 7,419.50 / bh
I. ASUMSI
1 Pekerjaan dilakukan secara manual/mekanis
2 Lokasi pekerjaan : di lokasi jembatan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00
5 Faktor kehilangan bahan Fk 1.10
6 Tebal plat jembatan 0.20
1. BAHAN
- Beton K300 0.22
- Baja tulangan (bila diperlukan)
2. ALAT
2.a. COMPRESSOR, JACK HAMMER & LOADER
Produksi per jam Q1 7.50
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 7.50
Produksi Galian / hari = Tk x Q1 Qt 52.50
Kebutuhan tenaga :
- Pekerja P 12.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.6000
- Mandor = (Tk x M) : Qt (L03) 0.1333
Rp. 81,433.20 / M3
SATUAN KETERANGAN
KM
M
-
jam
% Gradasi harus
% memenuhi Spec.
%
ton/m3
M3
M3
-
-
menit panduan
M3
jam
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
jam
SATUAN KETERANGAN
KM/jam
M
lintasan
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Analisa EI-812
SATUAN KETERANGAN
KM
M
-
jam
% Gradasi harus
% memenuhi
% Spesifikasi
M3
M3
-
-
menit
menit
M3
jam
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
jam
SATUAN KETERANGAN
KM/jam
M
lintasan
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Analisa EI-813
SATUAN KETERANGAN
KM
M
-
Jam
M3 Agregat lepas
M3
-
-
menit
menit
M3
Jam
ton
-
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
Berlanjut ke halaman berikut
Analisa EI-813
SATUAN KETERANGAN
KM/jam
M
lintasan
-
M3
jam
M3
M3
liter/menit
-
M3
jam
Lump Sum
M3 / Jam
M3
orang
orang
Jam
Jam
Analisa EI-814
SATUAN KETERANGAN
KM
Jam
-
%
%
ton / M3
M3
M3
M3
-
-
menit
menit
M3
Jam
ton
-
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
SATUAN KETERANGAN
Km / Jam
M
M
lintasan
-
M3
Jam
Lump Sum
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-815
SATUAN KETERANGAN
KM
M Rata-rata
Jam
-
-
% Gradasi harus -
% memenuhi -
% Spesifikasi
%
ton / M3
ton / M3
ton / M3
ton / M3
m
M3
M3
Kg
Kg
M3
-
-
km/jam
km/jam
menit
menit
menit
M3
Jam
SATUAN KETERANGAN
ton / Jam
-
M3
Jam
M3
Jam
Ton
-
KM / Jam
KM / Jam
Ton
menit
menit
menit
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
-
M3
Jam
Lump Sum
M3 / Jam
M3
orang
orang
Jam
Jam
Berlanjut ke halaman berikut
Analisa EI-815
SATUAN KETERANGAN
Analisa EI-817
SATUAN KETERANGAN
KM
M
Jam
-
-
Kg/M2
Kg/M2
Kg/M2
Kg/M3 (As1 : t)
ton / M3
ton / M3
M3
M3
Kg
M3
-
-
menit
menit
M3
Jam
ton
-
KM / Jam
KM / Jam
SATUAN KETERANGAN
menit
menit
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
-
M3
Jam
liter
-
liter/menit
kg/m3
m3
Jam
Lump Sum
M3/Jam
M3
orang
orang
Jam
Jam
SATUAN KETERANGAN
Analisa EI-818
SATUAN KETERANGAN
KM
jam
MM
%
M Rata-rata
Ton/M3
Ton/M3
Ton/M3
diambil
M3
Kg
liter
-
menit
menit
menit
menit
menit
M3
jam
KM/jam
M
lintasan
-
M3
jam
Berlanjut ke halaman berikut
Analisa EI-818
SATUAN KETERANGAN
ton
-
KM / Jam
KM / Jam
M3
menit
menit
menit
menit
menit
menit
M3 Melayani 1 buah
molen
Jam
M3/Jam
M3
orang
orang
jam
jam
Analisa EI-819
SATUAN KETERANGAN
KM
Jam
-
% 100 bagian
% 15 bagian
Kg / Ltr
Kg / Ltr
liter campuran
Kg
liter
liter
-
liter/menit
liter
Jam
liter
Jam
liter
Jam
SATUAN KETERANGAN
liter
liter
orang
orang
Jam
Jam
Analisa EI-821
SATUAN KETERANGAN
Jam
-
ton/m3
Km
ton
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
menit
M3 / Jam
jam
Lump Sum
M3
orang
orang
jam
jam
SATUAN KETERANGAN
KM
jam
-
M
ton
km
M3 Borrow Pit
ton
-
KM/jam
KM/jam
menit
menit
menit
menit
M2
jam
Lump Sum
M2 asumsi
orang
orang
jam
jam
SATUAN KETERANGAN
Analisa EI-821
SATUAN KETERANGAN
Jam
M3
ton/M3
Km
TON
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
Buah / Jam
jam
buah
Buah / Jam
jam
Lump Sum
SATUAN KETERANGAN
buah
orang
orang
jam
jam
Analisa EI-821
SATUAN KETERANGAN
Jam
M3
ton/m3
Km
ton
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
Buah / Jam
jam
Buah / Jam
jam
Lump Sum
SATUAN KETERANGAN
M2
orang
orang
jam
jam
Analisa EI-825
SATUAN KETERANGAN
Jam
M3
ton/m3
Km
ton
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
menit
Buah
jam
Buah
jam
Lump Sum
SATUAN KETERANGAN
buah
orang
orang
jam
jam
Analisa LI-831
URAIAN ANALISA HARGA SATUAN
SATUAN KETERANGAN
KM
jam
-
M2
M2
orang
orang
orang
jam
jam
jam
Analisa LI-832
SATUAN KETERANGAN
jam
-
M2
m3
kg
M2
orang
orang
orang
jam
jam
jam
Analisa LI-833
SATUAN KETERANGAN
jam
-
bh
m3
kg
M2
orang
orang
orang
jam
jam
jam
Analisa EI-851
SATUAN KETERANGAN
Jam
-
cm
m3
kg
(E05/26/10/15)
M3 / Jam
Jam
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
Analis
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
MATA PEMBAYARAN NO. : 8.1 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk - TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 Pek. Minor % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
MATA PEMBAYARAN NO. : 8.1 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk - TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 Pek. Minor % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
1. Agregat Kasar (M03) M3 1.2586 339,300.00
2. Agregat Halus (M04) M3 0.0000 337,600.00
3. Sirtu (M16) M3 0.0000 138,700.00
JUMLAH HARGA BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.1 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup AspTOTAL HARGA (Rp.) :
% THD. BIAYA PROYEK :
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.1 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Waterbound Macadam Utk. Pek. - TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 Minor % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0102 315,492.82
2. Dump Truck E09 Jam 0.0897 329,339.26
3. 3-Wheel Roller E16 Jam 0.0268 164,181.84
4. Alat BAntu Ls 1.0000 0.00
JUMLAH HARGA PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.1 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Minor TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0301 315,492.82
2. AMP E01 Jam 0.1108 2,122,130.91
3. Genset E12 Jam 0.1108 280,335.99
4. Dump Truck E09 Jam 0.4358 329,339.26
5. Pedestrian Roller E24 Jam 0.1975 69,616.49
6. Alat Bantu Ls 1.0000 0.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.1 (7) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Minor TOTAL HARGA :
SATUAN PEMBAYARAN : M3 (Perata) % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.1 (9) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Residu Bitumen Untuk Pek.Minor TOTAL HARGA :
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.2 (1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian untuk Bahu Jalan & Pek. Minor Lain TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :
PERKIRAAN HARGA JUM
NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (R
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
MATA PEMBAYARAN NO. : 8.2 (2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pembersihan dan Pembongkaran Tanaman TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 (diameter < 30 cm) % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.2 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penebangan Pohon, diameter 30 - 50 CM TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (R
A. TENAGA
1. Pekerja Biasa (L01) Jam 3.5000 6,285.71
2. Mandor (L03) Jam 0.3500 8,642.86
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.2 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penebangan Pohon, diameter 50 - 75 CM TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (R
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.2 (5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penebangan Pohon, diameter > 75 CM TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
(Rp.) (R
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.3.(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Stabilisasi Dengan Tanaman TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
Analis
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.3.(2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Semak/perdu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
Analis
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.3.(3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pohon TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.5.(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengembalian kondisi lantai jembatan beton TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
(Rp.) (R
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor E05 Jam 0.1333 133,852.72
2. Jack Hammer E26 Jam 0.1333 21,809.36
3. Wheel Loader E15 Jam 0.1333 315,492.82
4. Alat bantu Ls 1.0000 0.00
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
1,334.96
73.42
1,408.39
427,046.13
0.00
427,046.13
2,680.18
80,786.62
3,666.68
2,237.17
0.00
89,370.65
517,825.17
51,782.52
569,607.68
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
dak termasuk PPN
Analisa EI-812
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
800.98
73.42
874.40
427,046.13
0.00
0.00
427,046.13
2,680.18
53,501.07
3,666.68
2,237.17
0.00
62,085.11
490,005.63
49,000.56
539,006.20
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
JUMLAH
HARGA
(Rp.)
800.98
73.42
874.40
300,324.27
300,324.27
2,680.18
45,185.08
3,666.68
2,237.17
0.00
53,769.12
354,967.78
35,496.78
390,464.56
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
1,025.25
88.11
1,113.36
317,245.50
55,704.00
372,949.50
3,216.22
29,544.02
4,395.77
0.00
37,156.00
411,218.86
41,121.89
452,340.75
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
13,934.60
1,916.01
15,850.60
262,297.75
177,943.33
13,915.00
1,412,775.00
1,866,931.08
9,510.25
235,224.15
31,073.39
143,510.58
13,750.05
0.00
423,558.16
2,306,339.84
230,633.98
2,536,973.83
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
1,069.15
147.01
1,216.16
595,660.00
0.00
893,454.55
1,489,114.55
2,683.14
68,548.04
6,346.83
1,073.71
0.00
78,651.73
1,568,982.43
156,898.24
1,725,880.67
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
JUMLAH
HARGA
(Rp.)
12,117.04
2,776.82
14,893.86
394,422.30
703,500.00
1,097,922.30
10,946.86
13,750.05
149,279.99
0.00
173,976.89
1,286,793.06
128,679.31
1,415,472.36
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
20.86
2.87
23.73
8,871.39
729.30
9,600.69
9.93
44.43
109.31
163.67
9,788.09
978.81
10,766.90
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
6,285.71
864.29
7,150.00
0.00
59,677.86
0.00
59,677.86
66,827.86
6,682.79
73,510.65
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
440.00
121.00
561.00
125,520.00
125,520.00
15,086.45
0.00
15,086.45
141,167.45
14,116.74
155,284.19
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
22,000.00
3,025.00
25,025.00
0.00
98,206.59
0.00
0.00
98,206.59
123,231.59
12,323.16
135,554.75
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
22,000.00
3,025.00
25,025.00
0.00
163,677.65
0.00
0.00
163,677.65
188,702.65
18,870.26
207,572.91
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
29,333.33
4,033.33
33,366.67
0.00
357,114.86
0.00
0.00
357,114.86
390,481.53
39,048.15
429,529.68
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
JUMLAH
HARGA
(Rp.)
1,760.00
1,100.00
605.00
3,465.00
3,850.00
3,850.00
0.00
0.00
7,315.00
731.50
8,046.50
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
dak termasuk PPN
Analisa LI-832
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
2,640.00
0.00
605.00
3,245.00
3,850.00
3,850.00
0.00
0.00
7,095.00
709.50
7,804.50
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa LI-833
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
2,640.00
0.00
605.00
3,245.00
3,500.00
3,500.00
0.00
0.00
6,745.00
674.50
7,419.50
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-851
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
10,057.14
1,152.38
11,209.52
0.00
17,847.03
2,907.92
42,065.71
0.00
62,820.65
74,030.18
7,403.02
81,433.20
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.015 M
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Thermoplastic = C x R x (BJ.Cat) (M17b) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Blass Bead (M34) 0.4500 Kg
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.4.(1)
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA
Rp. 212,483.78 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.0038 M
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Non Thermoplastic = C x R x (BJ.Cat) (M17a) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Blass Bead (M34) 0.4500 Kg
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 3.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.4.(2)
JENIS PEKERJAAN : Marka Jalan Bukan Termoplastic
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 1.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 139.4 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4646 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7743 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 2.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 139.4 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4646 jam
- Pekerja = (Tk x P) : Qt (L01) 0.9292 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.4.(3) .(b)
JENIS PEKERJAAN : Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Pelat Rambu Jadi (High Intensity Grade) (M35b) 1.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 139.4 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4646 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7743 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.4.(4) .(a)
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan Permukaan Pemantul High Intensity Grade
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4646 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7743 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 20.0 Buah
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9 menit
- Menurunkan = Rata-rata 1 menit / buah T3 20.0 menit
- Lain-lain = geser, atur, tunggu, dll. T4 10.0 menit
Ts 91.9 menit
3. TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1 Qt 75.88 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0922 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3690 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7380 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.4.(5)
JENIS PEKERJAAN : Patok Pengarah
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 94.4 menit
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 66.75 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1049 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2097 jam
- Pekerja = (Tk x P) : Qt (L01) 0.5243 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.4.(6) .(a)
JENIS PEKERJAAN : Patok Kilometer
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 94.4 menit
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 66.75 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1049 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2097 jam
- Pekerja = (Tk x P) : Qt (L01) 0.5243 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.4.(6) .(b)
JENIS PEKERJAAN : Patok Hektometer
SATUAN PEMBAYARAN : BH URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar rel pengaman diterima di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 Km
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.00 -
7 Tulangan praktis Rc 50.00 Kg/Cu.m
2. ALAT
2,a DUMP TRUCK (E08) (E08)
Kapasitas 1 kali Angkut Cp 15.0 M'
Waktu Siklus : Ts
- Memuat T1 50.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan T3 60.0 menit
- Lain-lain T4 30.0 menit
Ts 181.9 menit
3. TENAGA
Produksi pasang pagar pengaman / hari = Tk x Q1 Qt 34.64 M'
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M' :
- Mandor = (Tk x M) : Qt (L03) 0.2021 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4042 jam
- Pekerja = (Tk x P) : Qt (L01) 1.6167 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.4.(7)
JENIS PEKERJAAN : Rel Pengaman
SATUAN PEMBAYARAN : M' URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar paku jalan diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor kehilangan bahan Fh 1.05 -
3. TENAGA
Produksi pasang paku jalan/ hari = Tk x Q1 Qt 20.00 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7000 jam
- Pekerja = (Tk x P) : Qt (L01) 1.7500 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar mata kucing diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
3. TENAGA
Produksi pasang mata kucing/ hari = Tk x Q1 Qt 20.00 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7000 jam
- Pekerja = (Tk x P) : Qt (L01) 1.7500 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (kerb pracetak) dicetak di base camp dan
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. FLAT BED TRUCK
Kapasitas 1 kali Angkut Cp 20.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 33.38 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 30.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 93.4 menit
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 89.96 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0778 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1556 jam
- Pekerja = (Tk x P) : Qt (L01) 0.3891 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.4.(10)
JENIS PEKERJAAN : Kerb Pracetak
SATUAN PEMBAYARAN : M URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan frontage
3 Bahan dasar ( blok beton ) telah berada di lokasi
pekerjaan / proyek
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
3. TENAGA
Produksi paving block / hari = Tk x Q1 Qt 348.60 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0201 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0803 jam
- Pekerja = (Tk x P) : Qt (L01) 0.1205 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.4.(12)
JENIS PEKERJAAN : Perkerasan Blok Beton pada Trotoar dan Median
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (kerb pemisah jalan)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 100.00 Kg/M3
2. ALAT
2.a. DUMP TRUK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 86.9 menit
3. TENAGA
Produksi pasang kerb pemisah jalan / hari = Tk x Q1 Qt 48.34 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1448 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2896 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1584 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.6(1)
JENIS PEKERJAAN : Kerb Pracetak Pemisah Jalan (Concrete Barrier)
SATUAN PEMBAYARAN : M URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 86.9 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 48.34 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1448 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2896 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1584 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.7(1)
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal
Type sodium 250 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 8.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 12.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 83.9 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 40.06 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1748 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3495 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3980 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.7(2)
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda
Type sodium 250 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 86.9 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 48.34 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1448 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2896 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1584 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.7(3)
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal
Type merkuri 250 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 8.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 12.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 83.9 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 40.06 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1748 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3495 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3980 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.7(4)
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda
Type merkuri 250 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 86.9 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 48.34 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1448 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2896 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1584 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.7(5)
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal
Type merkuri 400 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 8.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 12.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 83.9 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 40.06 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1748 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3495 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3980 jam
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.7(6)
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda
Type merkuri 400 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar pagar pemisah pedestrian corbon steel
seluruhnya diterima di base camp
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Pipa Carbon Steel Dia 3" = (3x2)+(1.4x2) m / 3 M V1 2.93 M
8 Pipa Carbon Steel Dia 1,5" = (1.0 x 20) / 3 M V2 6.67 M
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 30.00 M
Waktu Siklus : Ts
- Memuat = atur, ikat dll rata-rata 5 menit/m T1 50.00 menit
- Angkut V=40 Km/jam = (L : V) x 60 T2 13.09 menit
- Kembali V=60 Km/jam = (L : V) x 60 T3 8.73 menit
- Menurunkan = Rata-rata 2.5 menit/m T4 25.00 menit
- Lain-lain = geser, atur, tunggu dll T5 5.00 menit
Ts 101.81 menit
3. TENAGA
Produksi penanaman rumput / hari = Tk x Q1 Qt 123.76 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Las Tb 2.00 orang
- Pekerja P 4.00 orang
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.8(1)
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Carbon Steel
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0566 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1131 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2263 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar pagar pemisah pedestrian galvanised
seluruhnya diterima di base camp
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Pipa Galvanis Dia 3" = (3x2)+(1.4x2) m / 3 M V1 2.93 M
8 Pipa Galvanis Dia 1,5" = (1.0 x 20) / 3 M V2 6.67 M
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 30.00 M
Waktu Siklus : Ts
- Memuat = atur, ikat dll rata-rata 5 menit/m T1 50.00 menit
- Angkut V=40 Km/jam = Lef x V x 60 T2 13.09 menit
- Kembali V=60 Km/jam = Lef x V x 60 T3 8.73 menit
- Menurunkan = Rata-rata 2.5 menit/m T4 25.00 menit
- Lain-lain = geser, atur, tunggu dll T5 5.00 menit
Ts 101.81 menit
3. TENAGA
Produksi penanaman rumput / hari = Tk x Q1 Qt 123.76 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Las Tb 2.00 orang
- Pekerja P 4.00 orang
Berlanjut ke h
ITEM PEMBAYARAN NO. : 8.8(2)
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Galvanised
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0566 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1131 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2263 jam
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.0038 M
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 100 %
1. BAHAN
1.a. Cat Kerb (M17a) 141.7500 Kg
1.b.
1.c. Koefisien Cat = 0.6750
2. ALAT
2. ALAT BANTU Ls
Diperlukan :
- Sapu Lidi = 3 buah
- Sikat Ijuk = 3 buah
- Rambu-rambu pengaman = 2 buah
- Kuas = 4 buah
3. TENAGA
Produksi pekerjaan per hari = Qt 210.00 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Kepala Tukang Kt 1.00 orang
- Tukang Cat Tb 3.00 orang
- Pekerja P 4.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0333 jam
- K.Tukang = ( Kt x Tk ) : Qt (L02) 0.0333 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.1000 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1333 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Rp. 36,728.21 / M2
KETERANGAN
Spec.10.4.3(2)(d)
Spec.10.4.3(2)(e)
Berlanjut ke hal. berikut.
Analisa EI-841
KETERANGAN
Analisa EI-842
KETERANGAN
Spec.10.4.3(2)(d)
Spec.10.4.3(2)(e)
KETERANGAN
Analisa LI-843a
gineering Grade
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Berlanjut ke hal. berikut.
Analisa LI-843a
eering Grade
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa LI-843b
ineering Grade
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Berlanjut ke hal. berikut.
Analisa LI-843b
KETERANGAN
Analisa LI-844a
gh Intensity Grade
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Berlanjut ke hal. berikut.
Analisa LI-844a
ntensity Grade
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa LI-844b
h Intensity Grade
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Analisa EI-845
KETERANGAN
Berlanjut ke hal. berikut.
Analisa EI-845
KETERANGAN
Analisa EI-846a
KETERANGAN
Berlanjut ke hal. berikut.
Analisa EI-846a
KETERANGAN
Analisa EI-846b
KETERANGAN
Berlanjut ke hal. berikut.
Analisa EI-846b
KETERANGAN
Analisa EI-847
KETERANGAN
ukuran
sesuai
drawing
Berlanjut ke hal. berikut.
Analisa EI-847
KETERANGAN
Analisa EI-848
KETERANGAN
Analisa EI-849
KETERANGAN
Analisa EI-8410
KETERANGAN
Berlanjut ke hal. berikut.
Analisa EI-8410
KETERANGAN
Analisa EI-8412
KETERANGAN
0.0000
0.24825
KETERANGAN
Analisa EI-861
URAIAN ANALISA HARGA SATUAN
KETERANGAN
0.0000
0.24825
Berlanjut ke hal. berikut.
Analisa EI-861
KETERANGAN
0.0000
0.24825
Analisa EI-871
KETERANGAN
lumpsum
KETERANGAN
0.0000
0.24825
Analisa EI-861
lumpsum
Berlanjut ke hal. berikut.
Analisa EI-861
KETERANGAN
0.0000
0.24825
Analisa EI-873
KETERANGAN
lumpsum
KETERANGAN
Analisa EI-874
KETERANGAN
lumpsum
0.0000
0.24825
Berlanjut ke hal. berikut.
Analisa EI-874
KETERANGAN
Analisa EI-875
KETERANGAN
lumpsum
KETERANGAN
Analisa EI-876
KETERANGAN
lumpsum
Berlanjut ke hal. berikut.
Analisa EI-876
KETERANGAN
Analisa EI-881
KETERANGAN
Lump Sum
KETERANGAN
Analisa EI-882
KETERANGAN
Lump Sum
Berlanjut ke hal. berikut.
Analisa EI-882
KETERANGAN
Analisa EI-842a
KETERANGAN
Spec.10.4.3(2)(d)
Berlanjut ke hal. berikut.
Analisa EI-841
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Marka Jalan Termoplastik TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Marka Jalan Bukan Termoplastic TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
1. Cat Marka (M17a) Kg 1.9500 45,000.00
2. Thinner (M33) Liter 1.0500 29,500.00
3. Blass Bit (M34) Kg 0.4500 33,200.00
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(3) .(a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan PermukaTOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(3) .(b) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Rambu Jalan Ganda dengan PermukaaTOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(4) .(b) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Rambu Jalan Ganda dengan Permukaan
TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-845
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Patok Pengarah TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK :
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(6) .(a) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Patok Kilometer TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(6) .(b) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Patok Hektometer TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(7) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Rel Pengaman TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M' % THD. BIAYA PROYEK :
A. PEKERJA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(8) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Paku Jalan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-849
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(9) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Mata Kucing TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4 (10) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Kerb Pracetak TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(12) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Perkerasan Blok Beton pada Trotoar d TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.6(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Kerb Pracetak Pemisah Jalan (ConcreteTOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.7(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
1 Tiang lampu type tunggal, Lighting Po buah 1.00 15,665,000.00
2 Lampu sodium 250 watt buah 1.00 249,286.00
3 Kabel type m1 15.00 7,840.00
4 Beton K 250 M3 0.72 1,293,039.00
5 Reinforcing Steel deform = 56 x 1.05 Kg 58.80 14,562.50
6 MCB,1P, 16 A buah 1.00 36,400.00
7 Plat besi = 0.009x0.4x0.4x7850 M3 0.72 18,750.00
8 Copper Rod = 22/7 x(0.007)^2 x 1 x 7 Kg 1.21 4,480.00
9 Pipa PVC dia 3" M3 15.00 40,464.00
10 Bekisting buah 1.00 2,508,000.00
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.7(3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.7(5) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.7(6) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.8(1) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Carbon SteeTOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.8(2) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Galvanised TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : 8.4.(2) a PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Pengecatan Kerb, Trotoar & Median TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
3,771.43
1,767.86
648.21
6,187.50
118,560.00
30,975.00
14,940.00
164,475.00
10,038.95
12,465.62
0.00
22,504.57
193,167.07
19,316.71
212,483.78
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
3,771.43
1,767.86
648.21
6,187.50
87,750.00
30,975.00
14,940.00
133,665.00
10,038.95
12,465.62
0.00
22,504.57
162,357.07
16,235.71
178,592.78
an, volume dan/atau ukuran
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
4,867.24
3,650.43
1,338.49
9,856.16
176,000.00
284,300.00
16,328.76
0.00
476,628.76
25,740.11
0.00
25,740.11
512,225.03
51,222.50
563,447.54
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
5,840.69
3,650.43
1,338.49
10,829.60
352,000.00
284,300.00
16,328.76
0.00
652,628.76
25,740.11
0.00
25,740.11
689,198.48
68,919.85
758,118.33
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
4,867.24
3,650.43
1,338.49
9,856.16
216,500.00
284,300.00
16,328.76
0.00
517,128.76
25,740.11
0.00
25,740.11
552,725.03
55,272.50
607,997.54
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
4,867.24
3,650.43
1,338.49
9,856.16
433,000.00
284,300.00
16,328.76
0.00
733,628.76
25,740.11
0.00
25,740.11
769,225.03
76,922.50
846,147.54
an, volume dan/atau ukuran
Analisa EI-845
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
4,638.81
2,899.25
797.29
8,335.36
36,165.66
41,860.55
0.00
78,026.20
15,332.54
0.00
15,332.54
101,694.10
10,169.41
111,863.51
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
3,295.81
1,647.90
906.35
5,850.06
154,306.80
170,100.00
0.00
324,406.80
17,429.70
0.00
17,429.70
347,686.57
34,768.66
382,455.22
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
3,295.81
1,647.90
906.35
5,850.06
64,294.50
70,875.00
0.00
135,169.50
17,429.70
0.00
17,429.70
158,449.27
15,844.93
174,294.19
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
10,162.18
3,175.68
1,746.63
15,084.49
412,500.00
94,811.98
65,496.64
0.00
572,808.62
33,588.84
0.00
33,588.84
621,481.95
62,148.19
683,630.14
an, volume dan/atau ukuran
aikan satu satuan pekerjaan
tidak dapat diubah kecuali
ruksi Kepada Peserta Lelang
ai dan operator.
(tetapi tidak termasuk PPN
Analisa EI-848
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
11,000.00
5,500.00
3,025.00
19,525.00
64,294.50
16,800.00
0.00
81,094.50
0.00
0.00
100,619.50
10,061.95
110,681.45
an, volume dan/atau ukuran
Analisa EI-849
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
11,000.00
5,500.00
3,025.00
19,525.00
64,294.50
75,000.00
0.00
139,294.50
0.00
0.00
158,819.50
15,881.95
174,701.45
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
2,445.63
1,222.81
672.55
4,340.99
106,474.26
0.00
106,474.26
25,078.94
0.00
0.00
25,078.94
135,894.19
13,589.42
149,483.61
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
126.22
631.10
1,041.31
1,798.62
0.00
2,735.25
0.00
2,735.25
353.88
0.00
353.88
4,887.76
488.78
5,376.53
an, volume dan/atau ukuran
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
7,281.37
2,275.43
1,251.49
10,808.29
347,461.01
242,853.19
590,314.20
46,667.26
0.00
46,667.26
647,789.74
64,778.97
712,568.71
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
7,281.37
2,275.43
1,251.49
10,808.29
15,665,000.00
249,286.00
117,600.00
930,988.08
856,275.00
36,400.00
13,500.00
5,420.80
606,960.00
2,508,000.00
20,989,429.88
46,667.26
0.00
0.00
46,667.26
21,046,905.42
2,104,690.54
23,151,595.97
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
8,787.43
2,746.07
1,510.34
13,043.84
1,352,054.12
18,000.00
1,370,054.12
56,319.77
0.00
0.00
56,319.77
1,439,417.74
143,941.77
1,583,359.51
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
7,281.37
2,275.43
1,251.49
10,808.29
1,352,054.12
9,000.00
1,361,054.12
46,667.26
0.00
0.00
46,667.26
1,418,529.67
141,852.97
1,560,382.63
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
8,787.43
2,746.07
1,510.34
13,043.84
1,352,054.12
18,000.00
1,370,054.12
56,319.77
0.00
0.00
56,319.77
1,439,417.74
143,941.77
1,583,359.51
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
7,281.37
2,275.43
1,251.49
10,808.29
1,352,054.12
9,000.00
1,361,054.12
46,667.26
0.00
0.00
46,667.26
1,418,529.67
141,852.97
1,560,382.63
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
8,787.43
2,746.07
1,510.34
13,043.84
1,352,054.12
18,000.00
1,370,054.12
56,319.77
0.00
0.00
56,319.77
1,439,417.74
143,941.77
1,583,359.51
an, volume dan/atau ukuran
AN
1.00
350,311.69
#DIV/0!
JUMLAH
HARGA
(Rp.)
355.54
888.84
1,955.45
3,199.82
52,963.24
0.00
0.00
52,963.24
18,229.40
244,072.71
0.00
262,302.11
318,465.17
31,846.52
350,311.69
an, volume dan/atau ukuran
AN
1.00
1,112,919.69
#DIV/0!
JUMLAH
HARGA
(Rp.)
355.54
888.84
1,955.45
3,199.82
52,963.24
286,696.67
406,583.33
746,243.24
18,229.40
244,072.71
0.00
262,302.11
1,011,745.17
101,174.52
1,112,919.69
an, volume dan/atau ukuran
AN
0.00
0.00
#DIV/0!
JUMLAH
HARGA
(Rp.)
838.10
785.71
288.10
288.10
2,200.00
30,375.00
30,375.00
814.29
814.29
33,389.29
3,338.93
36,728.21
an, volume dan/atau ukuran
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
KET.
E08
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E11)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E23)
0
0
0
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E04)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E13)
0
0
0
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E15)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E14)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E10)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E07)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E16)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E19)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E25)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E18)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E05)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E06)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
(E22)
URAIAN ANALISA HARGA SATUAN
KETERANGAN
E26
Analisa EI-101
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (1)
JENIS PEKERJAAN : Pemeliharaan Rutin Perkerasan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (2)
JENIS PEKERJAAN : Pemeliharaan Rutin Bahu Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (3)
JENIS PEKERJAAN : Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (4)
JENIS PEKERJAAN : Pemeliharaan Rutin Perlengkapan Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (5)
JENIS PEKERJAAN : Pemeliharaan Rutin Jembatan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK :
A. TENAGA
B. BAHAN
C. PERALATAN
#DIV/0!
JUMLAH
HARGA
(Rp.)
2,376,000.00
653,400.00
3,029,400.00
6,088,615.66
19,374,574.89
11,376,610.48
16,631,000.00
53,470,801.02
8,551,575.49
8,121,649.94
3,373,088.59
20,046,314.03
76,546,515.05
7,654,651.51
84,201,166.56
10,525,145.82
5,847,303.23
k PPN yang dibayarkan
#DIV/0!
JUMLAH
HARGA
(Rp.)
792,000.00
217,800.00
1,009,800.00
18,480,585.21
1,848,000.00
20,328,585.21
4,275,787.75
4,060,824.97
2,068,691.21
10,405,303.93
31,743,689.14
3,174,368.91
34,918,058.05
4,364,757.26
2,424,865.14
k PPN yang dibayarkan
#DIV/0!
JUMLAH
HARGA
(Rp.)
1,584,000.00
435,600.00
2,019,600.00
15,741,511.00
15,741,511.00
17,103,150.99
8,376,894.70
25,480,045.69
43,241,156.69
4,324,115.67
47,565,272.36
5,945,659.05
3,303,143.91
k PPN yang dibayarkan
#DIV/0!
JUMLAH
HARGA
(Rp.)
396,000.00
54,450.00
450,450.00
4,598,140.00
4,598,140.00
4,060,824.97
4,060,824.97
9,109,414.97
910,941.50
10,020,356.47
1,252,544.56
695,858.09
k PPN yang dibayarkan
#DIV/0!
JUMLAH
HARGA
(Rp.)
4,752,000.00
1,306,800.00
6,058,800.00
14,781,459.64
14,781,459.64
40,608,249.70
40,608,249.70
61,448,509.33
6,144,850.93
67,593,360.26
8,449,170.03
4,693,983.35
k PPN yang dibayarkan
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
Retak sedang
40%
40%
20%
Thd.Biaya Bahan
KETERANGAN
Thd.Biaya Bahan
KETERANGAN
Thd.Total Pjg.Jln
Thd.Total Pjg.Jln
Thd.Biaya Bahan
KETERANGAN
1,141,340.00
381,440.00
776,290.00
Thd.Biaya Bahan
KETERANGAN
8,560,050.00
2,860,800.00
404,317.71
Thd.Biaya Bahan
ITEM PEMBAYARAN NO. : 10.A
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal lapis agregat padat t 0.15 M
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Berat isi padat Bip 1.81 ton/m3
8 Berat volume agregat (lepas) Bil 1.51 ton/m3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Mencampur T1 1.00 menit
- Memuat dan lain-lain T2 0.45 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 76.81 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 537.66 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1953 jam
- Mandor = (Tk x M) : Qt (L03) 0.0130 jam
Berlanjut ke halama
ITEM PEMBAYARAN NO. : 10.A
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal Lapis Hotmix padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi padat Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 %
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 %
- Semen FF 1.90 %
- Asphalt As 5.40 %
11 Berat Isi bahan :
- AC-WC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
11 Jarak Stock pile ke Cold Bin l 50.00 m
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10 & 10-15" x (D1 x tM3) x Fh1) : D2 (M92) 0.0307 M3
1.b. Agr 0-5 = ("0-5" x (D1 x tM3) x Fh1) : D3 (M91) 0.0298 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 1.8514 Kg
1.d. Aspal = (AS x (D1 x tM3) x Fh2) x 1000 (M10) 5.1615 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju Vf 15.00 km/jam
Kecepatan kembali Vr 20.00 km/jam
Waktu siklus
((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75 Ts1 1.10 menit
Berlanjut ke halama
ITEM PEMBAYARAN NO. : 10.B
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
3. TENAGA
Produksi menentukan : DUMP TRUCK Q4 0.94 M3 / Jam
Produksi ATB / hari = Tk x Q4 Qt 6.57 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 10.6506 Jam
- Mandor = (Tk x M) / Qt (L03) 2.1301 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2
- Agregat Pengunci Ap 25.00 Kg/M2
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2
As2 94.55 Kg/M3
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit
Ts1 0.45 menit
Berlanjut ke halama
ITEM PEMBAYARAN NO. : 10.C
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM
- Kadar Aspal terhadap berat total campuran As 4.50 %
- Tebal nominal padat t 0.04 M
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01 Ton/M3
- Aspal (diambil) D2 1.00 Ton/M3
- Agregat (diambil) D3 1.60 Ton/M3
7 Faktor kembang campuran Fk 1.20
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1997 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 90.4500 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 300.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts1
- Memuat T1 5.00 menit
- Mengaduk T2 3.50 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts1 13.50 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 1.107 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 7.75 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.9036 jam
- Pekerja = (Tk x P) : Qt (L01) 10.8434 jam
Berlanjut ke halama
ITEM PEMBAYARAN NO. : 10.D
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Rutin
SATUAN PEMBAYARAN : 10.D URAIAN ANALISA HARGA
Rp. 1,986,580.20 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 %
- Minyak Fluk / Pencair K 13.00 %
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Pencair D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus (termasuk proses pemanasan) Ts 2.00 Jam
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 207.50 liter
Produksi / hari = Tk x Q1 Qt 1,452.50 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
KETERANGAN
padat
Berlanjut ke halaman berikut
Analisa EI-10A
KETERANGAN
Lump Sum
Berlanjut ke halaman berikut
Analisa EI-10A
KETERANGAN
Analisa EI-10B
KETERANGAN
Gradasi harus -
memenuhi -
Spesifikasi
Berlanjut ke halaman berikut
Analisa EI-10B
KETERANGAN
Berlanjut ke halaman berikut
Analisa EI-10B
KETERANGAN
Lump Sum
Analisa EI-10C
KETERANGAN
Tabel 6.6.4.
Tabel 6.6.4.
Tabel 6.6.4.
(As1 : t)
Lihat panduan
Berlanjut ke halaman berikut
Analisa EI-10C
KETERANGAN
Berlanjut ke halaman berikut
Analisa EI-10C
KETERANGAN
Lump Sum
Analisa EI-10D
KETERANGAN
KETERANGAN
Melayani 1 buah
molen
Berlanjut ke halaman berikut
Analisa EI-10D
KETERANGAN
Analisa EI-10E
KETERANGAN
100 bagian
15 bagian
campuran
Berlanjut ke halaman berikut
Analisa EI-10E
KETERANGAN
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. U RAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
7,45 km 7,45 km
PETA LOKASI QUARRY
Medan Kisaran Kisaran - Sp. Kawat
km 000+000 Km 158+000
5,00 km
10,00 km
ke Rantau Prapat
Catatan :
Patumbak - Medan = 10 km
Medan - Lokasi Proyek = 165.20 km
Total Sumber Quarry Patumbak s/d Lokasi Proyek = 175.20 km
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 20.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 25.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam
9 Berat volume batu belah Bil 1.60 ton/m3
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 3,392.99 Rupiah
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 25.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume gravel Bil 2.20 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume sirtu Bil 1.51 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 15.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 7.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
KET.
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Base Camp
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
7,45 km
Sp. Kawat
Km 172+900
ke Tanjung
Balai
ke Rantau Prapat
HAN
HARGA
SATUAN
(Rp.)
25,750.00
451,283.70
329,339.26
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
19,500.00
451,283.70
329,339.26
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
9,000.00
451,283.70
329,339.26
315,492.82
6,285.71
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
8,000.00
451,283.70
329,339.26
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
17,500.00
451,283.70
329,339.26
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
18,000.00
451,283.70
329,339.26
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
20,000.00
451,283.70
329,339.26
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
Formulir Penentuan Harga Bahan
Bahan : Semen
2 Handling - - -
Bahan : Aspal
BIAYA
SEWA
ALAT/JAM
(di luar PPN)
2,122,130.91
151,308.53
29,920.74
365,906.67
133,852.72
68,144.17
539,056.24
166,208.23
329,339.26
451,283.70
322,287.70
280,335.99
339,348.23
228,630.81
315,492.82
164,181.84
340,952.26
351,852.69
334,087.97
23,281.60
528,998.77
22,111.84
159,158.80
69,616.49
29,372.40
21,809.36
995,967.08
159,349.76
360,013.61
254,800.14
356,277.76
65,803.25
703,034.51
23,357.68
369,226.63
1,477,530.50
295,338.69
5,669,222.54
7,504,769.53
364,420.40
240,687.91
437,322.26
459,571.81
544,291.37
341,655.45
323,655.45
47,558.97
28,811.52
422,086.14
489,292.09
438,299.94
154,866.09
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TRONTON
2. Tenaga Pw 150.0
3. Kapasitas Cp 15.0
4. Alat Baru : a. Umur Ekonomis A 10.0
b. Jam Kerja Dalam 1 Tahun W 1,500.0
c. Harga Alat B 450,000,000
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan COLD MILLING MACHINE
2. Tenaga Pw 248.0
3. Kapasitas Cp 1,000
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 4,945,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ROCK DRILL BREAKER
2. Tenaga Pw 3.0
3. Kapasitas Cp -
4. Alat Baru : a. Umur Ekonomis A 10.0
b. Jam Kerja Dalam 1 Tahun W 1,500.0
c. Harga Alat B 900,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COLD RECYCLER
2. Tenaga Pw 900.0
3. Kapasitas Cp 2,200
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 19,500,000,000
5.
A. URAIAN PERALATAN
1. Jenis Peralatan HOT RECYCLER
2. Tenaga Pw 400.0
3. Kapasitas Cp 3
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 29,250,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan AGGREGAT (CHIP) SPREADER
2. Tenaga Pw 115.0
3. Kapasitas Cp 3.5
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 1,000.0
c. Harga Alat B 395,000,000.0
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT DISTRIBUTOR
2. Tenaga Pw 115
3. Kapasitas Cp 4,000
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 395,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan SLIP FORM PAVER
2. Tenaga Pw 105
3. Kapasitas Cp 2.50
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 1,337,142,857
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PAN MIXER
2. Tenaga Pw 134
3. Kapasitas Cp 600.00
4. Alat Baru : a. Umur Ekonomis A 10.0
b. Jam Kerja Dalam 1 Tahun W 1,500.0
c. Harga Alat B 1,000,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE BREAKER
2. Tenaga Pw 290
3. Kapasitas Cp 20.00
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 900,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPAHLT TANKER
2. Tenaga Pw 190
3. Kapasitas Cp 4,000.00
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 500,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CEMENT TANKER
2. Tenaga Pw 190
3. Kapasitas Cp 4,000.00
4. Alat Baru : a. Umur Ekonomis A 6.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 500,000,000
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 50,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONDRETE MIXER (350)
2. Tenaga Pw 20
3. Kapasitas Cp 350.00
4. Alat Baru : a. Umur Ekonomis A 2.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 35,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER
2. Tenaga Pw 4
3. Kapasitas Cp 80.00
4. Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 1,000.0
c. Harga Alat B 20,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE
2. Tenaga Pw 125
3. Kapasitas Cp 60.00
4. Alat Baru : a. Umur Ekonomis A 10.0
b. Jam Kerja Dalam 1 Tahun W 1,500.0
c. Harga Alat B 1,170,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 75-100 TON
2. Tenaga Pw 200
3. Kapasitas Cp 75.00
4. Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 900,000,000
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00
2. Upah Operator / Sopir U1 7,071.43
3. Upah Pembantu Operator / Pmb.Sopir U2 6,285.71
4. Bahan Bakar Bensin Mb 4,500.00
5. Bahan Bakar Solar Ms 4,500.00
6. Minyak Pelumas Mp 24,200.00
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT
2. Tenaga Pw 50
3. Kapasitas Cp 30.00
4. Alat Baru : a. Umur Ekonomis A 10.0
b. Jam Kerja Dalam 1 Tahun W 1,500.0
c. Harga Alat B 500,000,000
###
HARGA
SATUAN KET.
BARU
Depresiasi
Kondisi Alat
Nilai B' dari
SATUAN KET.
##
E41
RILL BREAKER E36
HP ###
- ###
Tahun ###
Jam ###
Rupiah ###
###
###
###
###
###
Rupiah ###
###
- ###
Kondisi Alat
Nilai B' dari
Rupiah Depresiasi
##
Rupiah E42
###
###
Rupiah ###
###
###
###
Rupiah ###
###
###
Rupiah ###
###
Rupiah ###
###
###
Rupiah Kondisi Alat
Nilai B' dari
Rupiah Depresiasi
Rupiah
#
Rupiah E43
###
Rupiah ###
###
###
###
% / Tahun ###
Rp./Jam ###
Rp./Jam ###
Liter ###
Liter ###
Liter ###
###
###
Kondisi Alat
##
SATUAN KET.
###
###
###
D RECYCLER E38
HP ###
M ###
Tahun ###
Jam ###
Rupiah ###
###
###
###
###
###
Rupiah Kondisi Alat
Nilai B' dari
- Depresiasi
##
Rupiah E45
###
###
Rupiah ###
###
###
Rupiah ###
###
###
###
Rupiah ###
###
###
Rupiah ###
###
Rupiah Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
##
Rupiah E46
Rupiah ###
###
Rupiah ###
###
Rupiah ###
###
###
###
% / Tahun ###
Rp./Jam ###
Rp./Jam ###
Liter ###
Liter ###
Liter ###
Kondisi Alat
Nilai B' dari
Depresiasi
E47
###
SATUAN KET.
###
###
###
RECYCLER E39
HP ###
M ###
Tahun ###
Jam ###
Rupiah ###
###
###
###
Kondisi Alat
Nilai B' dari
Rupiah Depresiasi
- #
E48
###
Rupiah ###
###
###
Rupiah ###
###
###
Rupiah ###
###
###
###
Rupiah ###
###
> 15th ?
Rupiah Kondisi Alat
Nilai B' dari
Rupiah Depresiasi
##
Rupiah E49
###
Rupiah ###
Rupiah ###
###
Rupiah ###
###
Rupiah ###
###
###
###
% / Tahun ###
Rp./Jam ###
Rp./Jam ###
Liter ###
Liter Kondisi Alat
Liter Nilai B' dari
Depresiasi
#
E50
###
###
SATUAN KET.
###
###
###
(CHIP) SPREADER E40
HP ###
M ###
Tahun ###
Jam ###
Rupiah ###
###
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah ##
E51
- ###
###
###
Rupiah ###
###
###
Rupiah ###
###
###
Rupiah ###
###
###
###
Rupiah ###
Kondisi Alat
Nilai B' dari
Rupiah Depresiasi
Rupiah ###
E
###
Rupiah ###
###
Rupiah ###
Rupiah ###
###
Rupiah ###
###
Rupiah ###
###
###
###
% / Tahun ###
Rp./Jam > 15th ?
Rp./Jam Kondisi Alat
Liter Nilai B' dari
Liter Depresiasi
Liter
###
E
###
###
###
###
SATUAN KET.
###
###
###
T DISTRIBUTOR E41
HP ###
Liter ###
Tahun ###
Jam > 15th ?
Rupiah Kondisi Alat
Nilai B' dari
Depresiasi
###
E
Rupiah ###
###
- ###
###
###
Rupiah ###
###
###
Rupiah ###
###
###
Rupiah ###
###
> 15th ?
Kondisi Alat
Rupiah Nilai B' dari
Depresiasi
Rupiah #
E
Rupiah ###
###
###
Rupiah ###
###
Rupiah ###
Rupiah ###
###
Rupiah ###
###
Rupiah ###
###
###
> 15th ?
% / Tahun Kondisi Alat
Rp./Jam Nilai B' dari
Rp./Jam Depresiasi
Liter
Liter #
Liter E
###
###
###
###
###
###
SATUAN KET.
###
###
###
FORM PAVER E42
HP ###
M > 15th ?
Tahun Kondisi Alat
Jam Nilai B' dari
Rupiah Depresiasi
#
E
###
###
Rupiah ###
###
- ###
###
###
Rupiah ###
###
###
Rupiah ###
###
###
Rupiah > 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
#
E
Rupiah ###
###
Rupiah ###
###
###
Rupiah ###
###
Rupiah ###
Rupiah ###
###
Rupiah ###
###
Rupiah ###
> 15th ?
Kondisi Alat
Nilai B' dari
% / Tahun Depresiasi
Rp./Jam
Rp./Jam #
Liter E
Liter ###
Liter ###
###
###
###
###
###
###
SATUAN KET.
###
###
###
ETE PAN MIXER E43
HP Kondisi Alat
Liter Nilai B' dari
Tahun Depresiasi
Jam
Rupiah #
E
###
###
###
###
Rupiah ###
###
- ###
###
###
Rupiah ###
###
###
Rupiah ###
> 15th ?
Kondisi Alat
Rupiah Nilai B' dari
Depresiasi
#
Rupiah E
###
###
Rupiah ###
###
Rupiah ###
###
###
Rupiah ###
###
Rupiah ###
Rupiah ###
###
Rupiah ###
> 15th ?
Rupiah Kondisi Alat
Nilai B' dari
Depresiasi
% / Tahun #
Rp./Jam E
Rp./Jam ###
Liter ###
Liter ###
Liter ###
###
###
###
###
###
###
SATUAN KET.
###
> 15th ?
Kondisi Alat
ETE BREAKER E44
HP Depresiasi
m3/jam
Tahun #
Jam E
Rupiah ###
###
###
###
###
###
Rupiah ###
###
- ###
###
###
Rupiah ###
###
> 15th ?
Rupiah Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
#
E
###
Rupiah ###
###
###
Rupiah ###
###
Rupiah ###
###
###
Rupiah ###
###
Rupiah ###
Rupiah ###
> 15th ?
Rupiah Kondisi Alat
Nilai B' dari
Rupiah Depresiasi
#
E
% / Tahun ###
Rp./Jam ###
Rp./Jam ###
Liter ###
Liter ###
Liter ###
###
###
###
###
###
###
SATUAN KET.
Kondisi Alat
Nilai B' dari
Depresiasi
HLT TANKER E45
HP #
liter E
Tahun ###
Jam ###
Rupiah ###
###
liter ###
###
###
###
Rupiah ###
###
- ###
###
###
Rupiah > 15th ?
Kondisi Alat
Nilai B' dari
Rupiah Depresiasi
#
Rupiah E
###
###
###
Rupiah ###
Rupiah ###
###
Rupiah ###
###
Rupiah ###
###
###
Rupiah ###
###
Rupiah > 15th ?
Rupiah Kondisi Alat
Nilai B' dari
Rupiah Depresiasi
Rupiah #
E
###
###
% / Tahun ###
Rp./Jam ###
Rp./Jam ###
Liter ###
Liter ###
Liter ###
###
###
###
###
> 15th ?
Kondisi Alat
SATUAN KET.
Depresiasi
#
ENT TANKER E46
HP ###
liter ###
Tahun ###
Jam ###
Rupiah ###
###
###
###
###
###
Rupiah ###
###
- ###
> 15th ?
Kondisi Alat
Rupiah Nilai B' dari
Depresiasi
Rupiah #
E
###
Rupiah ###
###
###
###
Rupiah ###
###
###
Rupiah ###
###
Rupiah ###
###
###
Rupiah > 15th ?
Kondisi Alat
Rupiah Nilai B' dari
Rupiah Depresiasi
Rupiah ###
###
Rupiah ###
###
###
###
% / Tahun ###
Rp./Jam ###
Rp./Jam ###
Liter ###
Liter
Liter #
E
###
###
###
###
###
SATUAN KET.
###
###
###
ETE MIXER (350) E47
HP ###
liter ###
Tahun > 15th ?
Jam Kondisi Alat
Rupiah Nilai B' dari
Depresiasi
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
XER (AGITATOR) E49
HP
M3
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.
NG EQUIPMENT E52
HP
Ton
Tahun
Jam
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3
SATUAN KETERANGAN
%
Rupiah per 1 M3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : AGREGAT KELAS A :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A :
SATUAN PEMBAYARAN : M3 :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0378 315,492.82
2. Blending Equpment (E52) jam 0.0482 154,866.09
3 Alat Bantu Ls 1.0000 0.00
JUMLAH
HARGA
(Rp.)
474.65
326.32
800.98
104,771.67
170,478.63
19,672.06
294,922.36
11,911.91
7,463.43
0.00
19,375.34
315,098.68
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : KALBAR / KOTA PONTIANAK
ITEM PEMBAYARAN NO. : AGREGAT KELAS B :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B :
SATUAN PEMBAYARAN : M3 :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0378 315,492.82
2. Blending Equpment (E52) jam 0.0482 154,866.09
3 Alat Bantu Ls 1.0000 0.00
JUMLAH
HARGA
(Rp.)
474.65
326.32
800.98
67,353.22
73,062.27
111,724.23
252,139.71
11,911.91
7,463.43
0.00
19,375.34
272,316.03
ITEM PEMBAYARAN : AGREGAT KELAS C
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS C
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATU
I ASUMSI
1 Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Proporsi campuran : - Agregat Kasar Ak 32.50 %
- Pasir Ps 67.50 %
II METHODE PELAKSANAAN
KETERANGAN
Kap. Bucket
Di luar PPN