100.0000
Cumm
% for
Major
Items
i
No. Mata Perkiraan Harga % Thd.
Uraian Satuan
Pembayaran Kuantitas Satuan Total Biaya
(Rupiah) (%)
a b c d e f
100.00000
Jumlah
Harga-Harga
(Rupiah)
g = (d x e)
26,465,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
476,283,019
0
143,930,468
0
0
0
0
42,635,349
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
536,345,260
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
INFORMASI UMUM
No. URAIAN INFORMASI
7. Lebar jalan lama ( bahu + perkerasan + bahu ) ( 0.75 + 4.50 + 0.75 ) meter
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 20.00 Kilometer
D Quary
Km 2 + 000
20 ....................................
21 ....................................
###
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Proyek / Bagpro : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. Paket Kontrak : 10/KTR-KST/PKPP-PB/III/2010
Nama Paket : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
Prop / Kab / Kodya : PAPUA BARAT/MANOKWARI
Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)
1 UMUM 26,465,000
2 DRAINASE
PEKERJAAN TANAH
4 PERKERASAN BERBULIR 620,213,488
5 ASPAL LAPEN T.5CM 578,980,609
6 STRUKTUR
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 1,225,659,097
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 122,565,910
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 1,348,225,006
(D) JUMLAH DIBULATKAN 1,348,220,000
Terbilang : SATU MILYAR TIGA RATUS EMPAT PULUH DELAPAN JUTA DUA RATUS DUA PULUH RIBU RUPIAH
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.0 26,465,000 26,465,000
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 26,465,000
DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 0
2.2 Pasangan Batu dengan Mortar M3 0
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 0
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 0
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 0
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 620,213,488
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 578,980,609
DIVISI 7. STRUKTUR
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 0
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
A PERALATAN
Periksa lembar 1.2-2 8,050,000
B FASILITAS KONTRAKTOR
1 Base Camp M2 100.00 50,000 5,000,000
3 Barak M2 75.00 45,000 3,375,000
5 Gudang, dan lain-lain M2 45.00 25,000 1,125,000
C FASILITAS LABORATORIUM
5 Pendukung (Layanan Laboratorium) 1.00 3,000,000 3,000,000
D LAIN-LAIN
1 Papan Nama Proyek Bh 1.00 1,000,000 1,000,000
2 Pengukuran LS 1.00 1,000,000 1,000,000
3 Dokumentasi LS 1.00 500,000 500,000
4 Asbuit Drawing LS 1.00 1,000,000 1,000,000
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 2.2 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pasangan Batu Dengan Mortar untuk Saluran TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 5.2 (1) PERKIRAAN VOL. PEK. : 388.00
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas C TOTAL HARGA : 143,930,468.39
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 10.68
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 6.6 (1) PERKIRAAN VOL. PEK. : 204.20
JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam (t = 7cm) TOTAL HARGA : 536,345,260.27
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 39.78
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
61 Bunker Oil M54 Liter 3,000.00 Base Camp
62 Asbuton Halus M55 Ton 325,000.00 Base Camp
63 Baja Prategang M56 Kg 8,000.00 Base Camp
64 Baja Tulangan (Polos) U32 M57a Kg 8,400.00 Lokasi Pekerjaan
65 Baja Tulangan (Ulir) D39 M39c Kg 8,450.00 Lokasi Pekerjaan
66 Baja Tulangan (Ulir) D48 M39d Kg 9,000.00 Lokasi Pekerjaan
67 PCI Girder L=17m M58a Buah 86,000,000 Pelabuhan terdekat
68 PCI Girder L=21m M58b Buah 97,000,000 Pelabuhan terdekat
69 PCI Girder L=26m M58c Buah 124,000,000 Pelabuhan terdekat
70 PCI Girder L=32m M58d Buah 157,000,000 Pelabuhan terdekat
71 PCI Girder L=36m M58e Buah 168,000,000 Pelabuhan terdekat
72 PCI Girder L=41m M58f Buah 192,000,000 Pelabuhan terdekat
73 Beton K-300 M59 M3 2,517,308.08 Lokasi Pekerjaan
74 Beton K-175 M60 M3 1,817,225.04 Lokasi Pekerjaan
75 Cerucuk M61 M 15,000
76 Elastomer M62 buah 300,000
77 Bahan pengawet: kreosot M63 liter 5,000
78 Mata Kucing M64 buah 75,000
79 Anchorage M65 buah 480,000
80 Anti strpping agent M66 liter 24,000.00
81 Bahan Modifikasi M67 Kg 1,000.00
82 Beton K-500 M68 M3 3,072,048.44
83 Beton K-400 M69 M3 2,844,985.58
84 Ducting (Kabel prestress) M70 M' 150,000
85 Ducting (Strand prestress) M71 M' 50,000
86 Beton K-350 M72 M3 2,784,365.72
87 Multipleks 12 mm M73 Lbr 181,500.00
88 Elastomer jenis 1 M74a buah 385,500.00 Base Camp
89 Elastomer jenis 2 M74b buah 650,000.00 Base Camp
90 Elastomer jenis 3 M74c buah 838,000.00 Base Camp
91 Expansion Tipe Joint Asphaltic Plug M75d M 1,000,000.00 Base Camp
92 Expansion Join Tipe Rubber M75e M 1,200,000.00 Base Camp
93 Expansion Join Baja Siku M75f M 275,000.00 Base Camp
94 Marmer M76 Buah 400,000.00 Base Camp
95 Kerb Type A M77 Buah 45,000.00 Base Camp
96 Paving Block M78 Buah 40,000.00 Lokasi Pekerjaan
97 Mini Timber Pile M79 Buah 27,000.00 Lokasi Pekerjaan
98 Expansion Joint Tipe Torma M80 M1 1,200,000.00 Lokasi Pekerjaan
99 Strip Bearing M81 Buah 229,500.00 Lokasi Pekerjaan
100 Joint Socket Pile 35x35 M82 Set 607,500.00 Lokasi Pekerjaan
101 Joint Socket Pile 16x16x16 M83 Set 67,500.00 Lokasi Pekerjaan
102 Mikro Pile 16x16x16 M84 M1 60,750.00 Lokasi Pekerjaan
103 Matras Concrete M85 Buah 405,000.00 Lokasi Pekerjaan
104 Assetilline M86 Botol 229,500.00 Lokasi Pekerjaan
105 Oxygen M87 Botol 114,750.00 Lokasi Pekerjaan
106 Batu Bara M88 Kg 600.00 Lokasi Pekerjaan
107 Pipa Galvanis Dia 3" M24a M 20,000.00
108 Pipa Galvanis Dia 1,5" M24b M 15,000.00
109 Agregat Pecah Mesin 0-5 mm M91 M3 656,888.25 Base Camp
110 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 656,888.25 Base Camp
111 Agregat Pecah Mesin 20-30 mm M93 M3 656,888.25 Base Camp
112 Joint Sealent M94 Kg 34,100.00
113 Cat Anti Karat M95 Kg 35,750.00
114 Expansion Cap M96 M2 6,050.00
115 Polytene 125 mikron M97 Kg 19,250.00
116 Curing Compound M98 Ltr 38,500.00
117 Kayu Acuan M99 M3 1,250,000.00
118 Additive M67a Ltr 38,500.00
119 Casing M100 M2 9,000.00
120
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3 E15
2. Tenaga Pw 96.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 770,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 12.50 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 7,835.00 Liter
5. Bahan Bakar Solar Ms 9,104.00 Liter
6. Minyak Pelumas Mp 41,800.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
ITEM PEMBAYARAN NO. : 3.1 (1) Analisa EI-311
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.60 ton/m3 1.40 - 1.80
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90 lihat panduan
Waktu siklus Ts1 menit
- Menggali / memuat (standar) T1 0.320 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 938.07 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0149 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0075 Jam
Rp. 107,665.37 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.80 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER (E05/26/10/15)
Produksi per jam Q1 8.00 M3 / Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 8.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 56.00 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1250 Jam
Rp. 347,637.40 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
7 Pengurugan kembali (backfill) untuk struktur Uk 50.00 %/M3
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 (EI-322) 0.50 M3
M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman < 40 %) Fv 0.90 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali, memuat, lain-lain (standar) T1 0.32 menit
Waktu siklus = T1 x Fv Ts1 0.29 menit
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 938.07 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0298 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0075 Jam
Rp. 195,846.25 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Pengurugan kembali (backfill) untuk struktur Uk 50.00 %/M3
7 Faktor pembayaran Fp 2.00 1.5 - 2
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322) 1.00 M3
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu) 0.30 M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman 40 - 75%) Fv 1.00 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali / memuat, lain lain, standar T1 0.32 menit
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 60.30 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 422.13 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1658 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0166 Jam
Rp. 806,061.23 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Pengurugan kembali (backfill) untuk struktur Uk 30.00 %/M3
7 Faktor pembayaran Fp 2.00 1.5 - 2
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322) 0.60 M3
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu) 0.30 M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman > 75%) Fv 1.50 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali / memuat, lain lain, standar T1 0.32 menit
Waktu Siklus
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 40.20 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 281.42 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2985 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0249 Jam
Rp. 667,868.39 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.24 -
6 Berat volume bahan (lepas) D 2.20 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COLD MILLING (E36)
3. TENAGA
Produksi menentukan : COLD MILLING Q1 27.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 189.00 M2
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 3.1.(7) Analisa EI-317
JENIS PEKERJAAN : Galian Perkerasan Beraspal dengan Cold Milling Machine
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0741 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0370 Jam
Rp. 196,719.67 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.30 -
6 Tebal perkerasan aspal t 0.05 M
7 Berat volume perkerasan aspal (lepas) D 2.20 Ton/M3
8 Memakai Motor Grader ( yes = 1 , No = 0 ) 0
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER + AIR COMPRESSOR
Kapasitas bongkar bk 5.00 menit/m2 lihat panduan
Effesiensi kerja Fa 0.83
Kapa. Prod/jam = Fa x t x 60 Q1 0.498 M3
bk
Koefisien Alat / m3 = 1 : Q1 (E05/260 2.0080 Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 5.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 35.00 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.4000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.2000 Jam
Rp. 820,144.59 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Berat volume bahan D 1.60 Ton/M3
5 Faktor pengembangan bahan Fk 1.20
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas bak V 3.50 Ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktu siklus Ts
- Waktu tempuh isi = (Lt : v1) x 60 T1 9.00 menit
- Waktu tempuh kosong = (Lt : v2) x 60 T2 6.00 menit
Ts 15.00 menit
3. TENAGA
Tidak diperlukan tenaga kerja.
Rp. 18,494.86 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi Fv 0.90 Lihat panduan
Waktu sklus Ts1
- Muat T1 0.32 menit
Waktu Siklus = T1 x Fv Ts1 0.29 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 938.07 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0298 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0075 Jam
Rp. 337,349.32 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. WHELL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1
- Muat T1 1.00 menit
Ts1 1.00 menit
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 1.63 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 11.42 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.4509 Jam
- Mandor = (Tk x M) : Qt (L03) 0.6127 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : di atas tanah rawa
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan (lepas) D 1.69 Ton/M3
2. ALAT
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 987.70 M3
Asumsi permukaan hamparan di permukaan rawa :
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0142 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0071 Jam
Rp. 261,415.05 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.24 -
6 Tebal hamparan padat t 0.45 M
7 Berat volume bahan (lepas) D 1.93 Ton/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.80 -
Waktu sklus Ts1 menit
- Muat T1 0.55 menit
3. TENAGA
Produksi menentukan : Wheel Loader Q1 89.74 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 628.15 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0892 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0111 Jam
Rp. 170,421.96 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.24 -
6 Tebal hamparan padat t 0.45 M
7 Berat volume batu (lepas) D 1.93 Ton/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.80 -
Waktu sklus Ts1 menit
- Muat T1 0.55 menit
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 1.34 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 9.40 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.4887 Jam
- Mandor = (Tk x M) : Qt (L02) 0.7444 Jam
Rp. 342,599.34 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Berat volume batu belah D 1.93 -
6 Faktor pengembangan bahan Fk 1.24 -
7 Tebal hamparan padat t 0.45 M
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.80 -
Waktu sklus Ts1 menit
- Muat T1 0.55 menit
Ts1 0.55 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 214.76 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 1,503.29 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0093 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0047 Jam
I. ASUMSI
1 Pekerjaan dilaksanakan hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk 7.00 Jam
2. ALAT
2.a. MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh 50.00 M
Lebar Efektif kerja Blade b 2.40 M
Leba5 overlap bo 0.30
Faktor Efisiensi Alat Fa 0.83 -
Kecepatan rata-rata alat v 2.00 Km / Jam
Jumlah lintasan n 6.00 lintasan
Waktu siklus Ts1
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 1.50 menit
- Lain-lain T2 2.00 menit
Ts1 3.50 menit
3. TENAGA
Produksi menentukan : MOTOR GRADER Q1 1,529.57 M2/Jam
Produksi Pekerjaan / hari = Tk x Q1 Qt 10,707.00 M2
Kebutuhan tenaga :
- Pekerja P 6.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 0.0039 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0007 Jam
Rp. 2,002.28 / M2
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.1 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.1 (2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Batu TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor (E05) Jam 0.1250 196,900.29 24,612.54
2. Jack Hammer (E26) Jam 0.1250 28,270.88 3,533.86
3. Wheel Loader (E15) Jam 0.1250 420,128.50 52,516.06
4. Excavator (E10) Jam 0.1250 554,481.31 69,310.16
5 Dump Truck (E08) Jam 0.5153 305,270.24 157,311.37
Alat bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.1 (3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Struktur dengan Kedalaman 0 - 2 TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0075 554,481.31 4,137.60
2. Bulldozer (E04) Jam 0.014502 654,620.34 9,493.60
3. Alat bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.1 (4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Struktur dengan Kedalaman 2 - 4 TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0166 554,481.31 9,194.66
2. Bulldozer (E04) Jam 0.029005 654,620.34 18,987.20
3. Alat bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.1 (5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Struktur Kedalaman 4 m - 6 m TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0249 554,481.31 13,792.00
2. Bulldozer (E04) Jam 0.029005 654,620.34 18,987.20
3. Alat bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.1.(7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Perkerasan Beraspal dengan ColdTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Cold Milling (E36) Jam 0.0370 1,695,915.07 62,811.67
2 Dump Truck (E08) Jam 0.3768 305,270.24 115,019.10
3. Alat bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.1.(8) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN :Galian Perkerasan Beraspal tanpa Cold MiTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Jack Hammer E26 Jam 2.0080 28,270.88 56,768.84
2. Compresor E05 Jam 2.0080 196,900.29 395,382.11
3. Dump Truck E08 Jam 0.9434 305,270.24 288,006.47
4 Motor Greder E15 Jam 0.0000 420,128.50 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.1 (9) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Biaya Tambahan untuk jarak angkut bahTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3/Km % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.2 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timbunan Biasa dari selain Sumber Gali TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E15) Jam 0.0075 420,128.50 3,135.04
2. Dump Truck (E08) Jam 0.6699 305,270.24 204,506.61
3. Motor Grader (E13) Jam 0.0849 541,442.70 45,955.78
4 Vibro Roller (E19) Jam 0.0100 356,031.98 3,574.62
5. Alat Bantu Ls 1.0000 0.00 0.00
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.2 (2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timbunan Pilihan TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0286 420,128.50 11,998.32
2. Dump Truck (E08) Jam 0.6127 305,270.24 187,045.58
3. Motor Grader (E13) Jam 0.0023 541,442.70 1,224.19
3. Vibrator Roller (E19) Jam 0.0214 490,415.06 10,504.20
4. Water Tanker (E23) Jam 0.0070 291,252.18 2,046.95
5. Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.2 (3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timb. Pilihan Di Atas Tnh. Rawa (di ukurTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Dump Truck (E08) Jam 0.5224 305,270.24 159,480.15
2. Whell Loader (E15) Jam 0.0071 420,128.50 2,977.52
3. Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.2 (4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timbunan Batu dengan Manual TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0111 420,128.50 4,681.82
2. Dump Truck E08 Jam 0.3110 305,270.24 94,948.22
3. Bulldozer E04 Jam 0.0008 654,620.34 499.84
4 Tandem Roller E17 Jam 0.0096 329,502.10 3,179.10
5 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.2 (5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Timbunan Batu dengan Derek TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0111 420,128.50 4,681.82
2. Dump Truck E08 Jam 0.7444 305,270.24 227,230.07
3 Bulldozer E04 Jam 0.0008 654,620.34 499.84
4 Derek (Crane) E31 Jam 0.0111 610,805.76 6,806.69
5 Tandem Roller E19 Jam 0.0033 356,031.98 1,191.54
6 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.2 (6)
JENIS PEKERJAAN : Timbunan Batu dengan Derek PERKIRAAN VOL. PEK. : 0.00
SATUAN PEMBAYARAN : Ton TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0047 420,128.50 1,956.30
2. Dump Truck E08 Jam 0.3097 305,270.24 94,537.19
3. Bulldozer E04 Jam 0.0003 654,620.34 208.86
4 Derek (Crane) E31 Jam 0.0047 610,805.76 2,844.18
5 Tandem Roller E17 Jam 0.0040 329,502.10 1,328.39
6 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 3.3 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penyiapan Badan Jalan TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 0 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0007 541,442.70 353.98
2. Vibro Roller (E19) jam 0.0040 356,031.98 1,429.85
3 Alat Bantu Ls 1.0000 0.00 0.00
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Lebar bahu jalan Lb 1.00 M
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 % memenuhi Spec.
- Pasir Urug PU 30.00 %
10 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh 1.05
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) 1.25861 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain T1 0.45 menit panduan
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Lebar bahu jalan Lb 1.00 M
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
10 Berat volume agregat (lepas) Bil 1.51 ton/m3
- Agregat B Fh 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 - Pemuatan lepas
Faktor Efisiensi alat Fa 0.83 - sedang
Waktu siklus Ts1
- Memuat dan lain-lain T1 0.45 menit panduan
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Semen diangkut dari Base Camp ke lapangan
dengan menggunakan Dump Truck
7 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls 400.00 M
8 Faktor kehilangan bahan Fh 1.05 -
9 Tebal hamparan t 0.15 M
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas bak V 3.50 Ton
Faktor efisiensi alat Fa 0.80 -
Kecepatan rata-rata bermuatan v1 20.00 Km / Jam
Kecepatan rata-rata kosong v2 30.00 Km / Jam
Waktu Siklus : Ts1
- Waktu tempuh isi = (L : v1) x 60 menit T1 60.00 menit
- Waktu bongkar T3 30.00 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 40.00 menit
- Lain-lain T4 5.00 menit
Ts1 135.00 menit
3. TENAGA
Lebar Hamparan Soil Cement b 6.00 M
Kadar semen (3 - 12) % s 7.50 %
Berat jenis tanah Bj 1.60 ton / M3
Setiap hari dengan produksi = {(s : 100) x t x b x Ls} x Bj Qt 43.20 Ton
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jarak rata-rata sumber material ke lokasi pekerjaan L 20.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Harga pembayaran tidak termasuk semen ( semen
dibayar dalam item tersendiri)
7 Satu hari dapat diselesaikan hamparan Soil Cement
sepanjang Ls 400.00 M
8 Faktor kembang material (padat - lepas) Fk 1.20 -
9 Tebal hamparan padat t 0.15 M
10 Berat volme Aggregat (Lepas) D 1.60 ton/M3
1. BAHAN
Setiap M3 Soil Cement padat diperlukan = 1 x Fk (M08) 1.20 M3
2. ALAT
2.a. WHEL LOADER (E15)
Kapasitas bucket V 1.50 M3 lepas
Faktor bucket Fb 0.90 - Pemuatan sedang
Faktor efisiensi alat Fa 0.83 -
Waktu siklus : Ts1
- Muat T1 0.45 menit panduan
Ts1 0.45 menit
3. TENAGA
Produksi menetukan : WHEEL LOADER Q1 124.50 M3/Jam
Produksi Soil Cement / hari = Tk x Q1 Qt 871.50 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0562 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0080 Jam
Rp. 439,319.50 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal SBST t 1.50 Cm
9 Lapisan SBST terdiri dari (spesifikasi) :
- Menggunakan material ukuran Ld 1.30 Cm
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : V - loading Ts1 0.45 menit lihat tabel
V - Loading
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 8,179.71 M2
Produksi / hari = Tk x Q1 Qt 57,257.97 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0024 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0001 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As 95.24 % 100 bagian
- Minyak Tanah / Pencair K 4.76 % 5 bagian
7 Berat jenis bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / Ltr
- Minyak Tanah / Pencair D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter Campuran
2. ALAT
2.a. APHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Faktor efisiensi kerja Fa 0.80 - kondisi sedang
Kapasitas pompa aspal pas 100 liter/menit
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q1 4,800.00 Ltr/Jam
Produksi / hari = Tk x Q1 Qt 33,600.00 Liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As 56 % 100 bagian
- Kerosene K 44 % 80 bagian
7 Berat jenis bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / liter
- Minyak Flux / Pencair D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.10 liter Campuran
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Kecepatan penyemprotan V 30.00 m/menit Asumsi
Kapasitas pompa aspal pas 100 liter/menit Panduan
Faktor effisiensi kerja Fa 0.80 Sedang
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4 4,800.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 33,600.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 4.2 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 4.2 (2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Lps. Pond. Ag. Kls. B, CBR Min 60% TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 4.2 (3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Semen utk. Pond. Semen Tanah TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : TON % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
1. Semen (M12) Kg 1,050.0000 1,950.72 2,048,256.00
C. PERALATAN
1. Dump Truck (E08) Jam 0.8438 305,270.24 257,571.76
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 4.2 (4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Lapis Pondasi Semen Tanah TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
1. Tanah Timbunan (M08) M3 1.2000 41,000.00 49,200.00
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0080 420,128.50 3,374.53
2. Dump Truck (E08) Jam 0.9815 305,270.24 299,613.19
3. Motor Grader (E13) Jam 0.0039 541,442.70 2,114.07
4. Tandem Roller (E17) Jam 0.0268 329,502.10 8,822.01
5. P. Tyre Roller (E18) Jam 0.0065 507,900.83 3,280.02
6. Water Tanker (E23) Jam 0.0141 291,252.18 4,093.91
7. Cold Milling (E36) Jam 0.0167 1,695,915.07 28,378.77
8. Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 4.2 (5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Agregat Penutup BURTU TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 4.2 (6) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Bahan aspal untuk Pekerjaan PelaburaTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 4.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Lapis Resap Pengikat TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
870,760.23
ALAT
PERALATAN
(lepas)
3,569.08
339,355.90
5,073.76
14,115.22
4,093.91
0.00
0.00
Jam
366,207.87
(E08)
1,237,502.08
123,750.21
1,361,252.29
SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pe
berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk meny
Jam
ITEM PEMBAYARAN NO. : 6.4 (1) Analisa EI-641
JENIS PEKERJAAN : Lasbutag
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Pek. ini tdk. termasuk Bitumen Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal LASBUTAG t 3.00 Cm
9 Lasbutag terdiri dari (spesifikasi) :
- Agregat Kasar CA 30.00 % Total Campuran
- Pasir Ps 49.50 % Total Campuran
- Asbuton Asb 16.00 % Total Campuran
- Peremaja, terdiri atas : Md 4.50 % Total Campuran
- Bunker Oil (BO) Bo 47.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 15.00 % Total Modifier
- Bahan Anti Stripping (jarang digunakan) As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Lasbutag D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
3. TENAGA
Produksi menentukan : ASPHALT FINISHER Q5 3,213.00 M2
Produksi / hari = Tk x Q5 Qt 22,491.00 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0062 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 1.50 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar (umumnya tidak digunakan) CA 0.00 % Total Campuran
- Pasir Ps 73.00 % Total Campuran
- Asbuton Asb 21.00 % Total Campuran
- Peremaja, terdiri atas : Md 6.00 % Total Campuran
- Bunker Oil (BO) Bo 44.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 18.00 % Total Modifier
- Bahan Anti Stripping As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.85 -
Waktu Siklus : Ts1 0.45 menit lihat tabel
V - loading
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Asphal Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 2.00 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar CA 14.00 % Total Campuran
- Pasir Ps 63.00 % Total Campuran
- Asbuton Asb 18.00 % Total Campuran
- Peremaja, terdiri atas : Md 5.00 % Total Campuran
- Bunker Oil (BO) Bo 44.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 18.00 % Total Modifier
- Bahan Anti Stripping As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1 0.45 menit lihat tabel
V - loading
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1. BAHAN
2 ALAT
3. TENAGA
I. ASUMSI
1 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 Km
2 Jam kerja efektif per-hari Tk 7.00 Jam
3 Kandungan Bitumen dalam Bunker Oil (BO) Bbo 80.00 %
4 Kandungan Bitumen dalam Aspal Semen Bas 100.00 %
5 Kandungan Bitumen dalam Kerosene Bk 0.00 %
6 Proporsi Peremaja (modifier Lasbutag) :
- Bunker Oil (BO) Bo 47.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 15.00 % Total Modifier
- Bahan Anti Stripping (umumnya tidak digunakan) As 0.00 % Total Modifier
7 Berat Isi bahan : - Modifier D1 0.99 T/m3
- Bunker Oil (BO) D2 0.97 T/m3
- Aspal Semen D3 1.03 T/m3
- Minyak Tanah D4 0.80 T/m3
8 Penyiapan Peremaja dilaksanakan di Base Camp
1. BAHAN
1.a Bunker Oil (BO) = (1000:Bit) x Bp1 x 1.01 : D2 (M54) 647.3300 Liter
1.b Aspal Semen = (1000:Bit) x Bp2 x 1.01 (M10) 507.6720 Kg
1.c Minyak Tanah = (1000:Bit) x Bp3 x 1.01 : D3 (M11) 250.4960 Liter
2 ALAT
3. TENAGA
Produksi menentukan : Liquid Asphalt Mixer Q1 1.26 Ton
Produksi / hari = Tk x Q1 Qt 8.85 Ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 6.4 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Lasbutag TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 6.4 (2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Latasbusir Kelas A TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 6.4 (3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Latasbusir Kelas B TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
1. Pekerja (L01) Jam 0.0064 7,142.86 45.53
2. Mandor (L02) Jam 0.0003 12,857.14 4.10
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 6.4 (4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Bitumen Asbuton TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA PERALATAN 0.00
Analisa EI-645
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
(PENINGKATAN JALAN AMBAN MULYO)
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 6.4 (5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Bitumen Bahan Peremaja TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
4 Bulldozer E04
9.7 7 175 7 1225 jam 0.000
6 Concrete Vibrator
7.1(5) 4 100 7 700 m3 0.000
7.1(6) 4 100 7 700 m3 0.000
7.1(8) 4 100 7 700 m3 0.000
7 Compressor E05
6.1(1) 9 225 7 1575 liter 0.000
9.17 7 175 7 1225 jam 0.000
8 Crane E07
9.12 7 175 7 1225 jam 0.000
10 Excavator E10
2.1 7 175 7 1225 m3 0.000
3.1(1) 6 150 7 1050 m3 0.000
9.11 7 175 7 1225 jam 0.000
0.000000 0.00000 1 1
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000 0.00000 1 1
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
Peralatan Yang Diperlukan
jumlah alat jumlah minimal kebut. di
per item alat lapangan
10=8x9 11 12 13
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000041
0.000000
0.000049 0.00005 1 1
0.000000
0.000000
0.000000
0.000 0.000 1 1
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000 0.000 1 1
0.000
0.000 0.000 1 1
0.000 0.000 18 18
Peralatan Yang Diperlukan
jumlah alat jumlah minimal kebut. di
per item alat lapangan
10=8x9 11 12 13
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 3 3
0.000
0.000
0.000 0.000 1 1
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
Peralatan Yang Diperlukan
jumlah alat jumlah minimal kebut. di
per item alat lapangan
10=8x9 11 12 13
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 3 3
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 1 1
II. URUTAN KERJA
1 Persiapan bekisting
2 Pekerjaan pembesian
3 Pekerjaan pengecoran
4 Pekerjaan pemasangan
1. BAHAN
- Pracetak PC Diafragma bentang K 350 0.1580 m3
- tulangan 31.5900 kg
2.
ALAT
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Beton & tulangan sesuai analisa item pekerjaan ybs.
3 Tiang Pcg. dibuat di Base Camp & diangkut ke lokasi pek.
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 14.10 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Panjang Tiang (sesuai kebutuhan) Lt 7.96 M
7 Ukuran tiang pancang (sesuai kebutuhan) Uk 0.40 M
8 Kebutuhan baja tulangan : 250 Kg/m3 Mb 250.0 Kg/M3
1. BAHAN
1.a. Beton K 400 (EI-712) 1.0000 M3
1.b. Baja Tulangan = Mb (EI-732) 250.0 Kg
1.c. Plat Baja utk Sepatu tiang/sambungan (t=16mm) (M48) 4.5038 Kg
1.d. Kayu Bekisting tambahan = {Uk x 1.0 x 4 x 0.02} (M19) 0.0320 M3
1.e. Paku (M18) 0.3200 Kg
2. ALAT
2.a TRAILER (E29)
Kapasitas bak sekali muat V 7.00 batang
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus : Ts1
- Waktu tempuh isi = (L : v1 ) x 60 T1 42.30 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 28.20 menit
- Lain-Lain (tunggu, bongkar dan muat) T3 140.00 menit
Ts1 210.50 menit
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.4000 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.8000 jam
- Pekerja = (Tk x P) : Qt (L01) 5.6000 jam
Rp. 6,285,408.81 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 2.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 6.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 6.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 5.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 4.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.45 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 5.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 2.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Banyak Galian pada Caison / M' Vt 4.91 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.45 M
7 Banyak Galian pada Caison / M' Vt 9.62 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 3.61 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 243.15 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 4.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.45 M
7 Banyak Galian pada Caison / M' Vt 12.57 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.75 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 2.08 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 183.09 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 14.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal Lapis perkerasan beton padat t 0.30 m
7 Kadar Semen Minimum (Spesifikasi) Ks 365 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
10 Perbandingan Camp. : Semen Sm 400.0 % Berdasarkan
: Pasir Ps 791.0 % JMF & sesuai
: Agregat Kasar Kr 1,077.0 % dgn Spesifikasi
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7028 jam
- Pekerja = (Tk x P) : Qt (L01) 1.4056 jam
Rp. 0.00 / M2
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 7.7 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-772
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 7.7 (2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-773
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 7.7 (3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-774
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-775
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 7.7 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 7.7 (8) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 7.16.1 PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Perkerasan Jalan Beton TOTAL HARGA (Rp.) : -
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja (L01) jam 1.4056 7,142.86 10,040.16
2. Tukang (L02) jam 0.7028 9,285.71 6,526.10
3. Mandor (L03) jam 0.1506 12,857.14 1,936.32
B. BAHAN
1. Semen (M12) Kg 410.0000 1,950.72 799,795.20
2 Pasir (M01a) M3 0.6237 357,300.00 222,838.39
3 Agregat Kasar (M03) M3 0.7885 656,888.25 517,968.12
4 Baja Tulangan Polos (M39a) Kg 15.8750 8,500.00 134,937.50
5 Joint Sealent (M94) Kg 0.9900 34,100.00 33,759.00
6 Cat Anti Karat (M95) Kg 0.0200 35,750.00 715.00
7 Expansion Cap (M96) M2 0.1700 6,050.00 1,028.50
8 Polytene 125 mikron (M97) Kg 0.4375 19,250.00 8,421.88
9 Curing Compound (M98) Ltr 0.8700 38,500.00 33,495.00
10 Multiplex 12 mm (M73) Lbr 0.1600 181,500.00 29,040.00
11 Kayu Acuan (M99) M3 0.0960 1,250,000.00 120,000.00
12 Paku (M18) Kg 1.0240 5,500.00 5,632.00
13 Additive (M67a) Ltr 0.9139 38,500.00 35,185.92
JUMLAH HARGA BAHAN 1,942,816.50
C. PERALATAN
1 Wheel Loader E15 jam 0.0244 420,128.50 10,255.91
2 Batching Plant E43 jam 0.0502 598,143.37 30,027.28
3 Truck Mixer E49 jam 0.4701 638,597.74 300,218.49
4 Con. Vibrator E20 jam 0.0502 46,413.98 2,330.02
5 Water Tank Truck E23 jam 0.0211 291,252.18 6,140.86
6 Conc. Paver E42 jam 0.0074 547,490.89 4,071.78
7 Alat Bantu Ls 1.0000 0.00 0.00
8
0.025
PROV. PAPUA BARAT
ITEM PEMBAYARAN NO. : 8.1 (1) Analisa EI-811
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk Pek. Minor
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 % memenuhi Spec.
- Pasir Urug PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh 1.05
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) ### M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45 menit panduan
TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 25.00 orang
- Mandor M 1.00 orang
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2124 jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
9 Berat volume agregat (lepas) Bil 1.51
- Agregat B Fh 1.05
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1274 jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Muat T1 0.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3 / Jam
Produksi Agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1274 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Faktor kehilangan material Agregat Fh 1.10 -
7 Komposisi campuran (taksiran) :
- Agregat Kasar Ak 85.00 %
- Agregat Halus Ah 15.00 %
8 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
9 Berat isi padat Bip 1.81
10 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Menunggu, dan lain lain T1 0.45 menit
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 98.09 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 686.66 M3
Kebutuhan tenaga :
- Pekerja P 16.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1631 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0102 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 KM
5 Tebal Lapis Hotmix padat untuk patching t 0.04 M Rata-rata
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran ATB :
- Coarse Agregat CA 55.00 % Gradasi harus -
- Fine Agregat FA 37.50 % memenuhi -
- Fraksi Filler FF 1.00 % Spesifikasi
- Asphalt minimum 6 % As 6.50 %
9 Berat jenis bahan :
- ATB D1 2.30 ton / M3
- Coarse Agregat & Fine Agregat D2 1.80 ton / M3
- Fraksi Filler D3 2.00 ton / M3
- Asphalt D4 1.03 ton / M3
10 Jarak stock pile ke cold bin l 100.00 m
11 Faktor kembang Fk 1.20
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju (ke bin) Vf 15.00 km/jam
Kecepatan kembali (ke stock pile) Vr 20.00 km/jam
Waktu Siklus Ts1
- Muat = l x 60 + l x 60 T1 0.70 menit
- Lain lain 1000 x Vf 1000 x Vr T2 0.75 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : AMP Q6 18.04 M3 / Jam
Produksi ATB / hari = Tk x Q6 Qt 126.30 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 1.1084 Jam
- Mandor = (Tk x M) / Qt (L03) 0.1108 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2
- Agregat Pengunci Ap 25.00 Kg/M2
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2
As2 94.55 Kg/M3 (As1 : t)
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1683 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 140.700 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : Ts1
- Memuat T1 0.50 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.30 menit
- Tunggu, dll. T4 0.20 menit
Ts1 2.00 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 10.375 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 72.63 M3
Kebutuhan tenaga : - Mandor M 2.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1928 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1566 jam
Rp. 2,038,603.81 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 % 100 bagian
- Minyak Fluk / Pencair K 13.00 % 15 bagian
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Minyak Tanah (Kerosene) D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter campuran
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 850.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Kapasitas pompa aspal pas 55.00 liter/menit
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 3,012.90 liter
Produksi / hari = Tk x Q1 Qt 21,090.30 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat jenis bahan (lepas) D 1.60 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 2.00 menit
Ts2 47.00 menit
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000 jam
- Mandor = (Tk x M) : Qt (L03) 0.1000 jam
Rp. 116,113.60 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang/baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor pengembangan bahan Fk 1.20 -
7 Tebal hamparan padat t 0.15 M
8 Hasil bongkaran per M2 luas area d 0.50 ton
1. BAHAN
1a Bahan timbunan = 1 x Fk (M08) 1.20 M3 Borrow Pit
2. ALAT
2.a DUMP TRUCK (E09)
Kapasitas bak V 10.00 ton
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/jam
Kecepatan rata-rata kosong v2 30.00 KM/jam
Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 menit T1 60.00 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 40.00 menit
- Lain-lain (termasuk dumping setempat-setempat) T3 2.00 menit
Ts2 102.00 menit
Kap. Prod. / jam = V x Fa x 60 Q2 9.76 M2
Ts2 x d
Koefisien Alat / M3 = 1 : Q2 (E09) 0.1024 jam
TENAGA
Produksi pembersihan dan pembongkaran/hari Qt 500.00 M2 asumsi
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Mandor M 1.00 orang
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0700 jam
- Mandor = (Tk x M) : Qt (L03) 0.0140 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 30-50 cm setara dengan volume Vp 3.00 M3
6 Berat Jenis Kayu BjK 0.90 ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 TON
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10.00 menit
Ts 55.00
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 50 - 75 cm setara dengan volume Vp 5.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10.00 menit
Ts2 55.00
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 3.5000 jam
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter > 75 cm setara dengan volume Vp 10.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 15.00 menit
Ts 60.00 menit
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 4.6667 jam
- Mandor = (Tk x M) : Qt (L03) 0.4667 jam
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (gebalan rumput) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
1. BAHAN
1.a. Gebalan Rumput = 1 M2 x Fh (M32) 1.1000 M2
2. ALAT
2.a. ALAT BANTU
- Gerobak Dorong = 2 buah
- Tusuk Bambu = 5 buah / M2
- Pagar Tali = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 4.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1400 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2800 jam
Rp. 8,855.00 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar (semak/perdu) diterima seluruhnya di lokasi pekerjaan
1. BAHAN
1.a. - Semak/perdu (M32) 1.10 M2
1.b. - Tanah humus setebal 20 cm mxx 0.22 m3
1.c. - Pupuk mxx 0.25 kg
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 0.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0000 jam
- Pekerja = (Tk x P) : Qt (L01) 0.4200 jam
Rp. 8,525.00 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar pohon dan bahan lainnya diterima di lokasi pekerjaan
4 ukuran lubang 0,5 x 0,5 x 0,5 m
1. BAHAN
1.a. - pohon (M32) 1.00 bh
1.b. - Tanah humus setebal 20 cm mxx 0.22 m3
1.c. - Pupuk mxx 0.50 kg
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 0.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0000 jam
- Pekerja = (Tk x P) : Qt (L01) 0.4200 jam
Rp. 8,140.00 / bh
1. BAHAN
- Beton K300 0.22 m3
- Baja tulangan (bila diperlukan) kg
2. ALAT
2.a. COMPRESSOR, JACK HAMMER & LOADER (E05/26/10/15)
Produksi per jam Q1 7.50 M3 / Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 7.50 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 52.50 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.6000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1333 Jam
Rp. 109,101.10 / M3
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA PAPUA BARAT/MANOKWARI
MATA PEMBAYARAN NO. : 8.1 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk - TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 Pek. Minor % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
MATA PEMBAYARAN NO. : 8.1 (2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk - TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 Pek. Minor % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.1 (3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup AspTOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.1 (4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Waterbound Macadam Utk. Pek. - TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 Minor % THD. BIAYA PROYEK : 0.00
A. TENAGA
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.1 (5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Minor TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
1. Pekerja Biasa (L01) Jam 1.1084 7,142.86 7,917.38
2. Mandor (L03) Jam 0.1108 12,857.14 1,425.13
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0301 420,128.50 12,664.40
2. AMP E01 Jam 0.0554 6,405,836.54 355,022.27
3. Genset E12 Jam 0.0554 490,415.06 27,179.63
4. Dump Truck E09 Jam 0.7482 536,019.09 401,045.61
5. Pedestrian Roller E24 Jam 0.1975 72,129.67 14,246.43
6. Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.1 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Minor TOTAL HARGA : 0.00
SATUAN PEMBAYARAN : M3 (Perata) % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.1 (8) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Minor TOTAL HARGA : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.1 (9) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Residu Bitumen Untuk Pek.Minor TOTAL HARGA : 0.00
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.2 (1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian untuk Bahu Jalan & Pek. Minor Lain TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
MATA PEMBAYARAN NO. : 8.2 (2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pembersihan dan Pembongkaran Tanaman TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 (diameter < 30 cm) % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.2 (3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penebangan Pohon, diameter 30 - 50 CM TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.2 (4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penebangan Pohon, diameter 50 - 75 CM TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.2 (5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Penebangan Pohon, diameter > 75 CM TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.3.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Stabilisasi Dengan Tanaman TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa LI-832
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa LI-833
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-851
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor E05 Jam 0.1333 196,900.29 26,253.37
2. Jack Hammer E26 Jam 0.1333 28,270.88 3,769.45
3. Wheel Loader E15 Jam 0.1333 420,128.50 56,017.13
4. Alat bantu Ls 1.0000 0.00 0.00
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.015 M Spec.10.4.3(2)(d)
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Thermoplastic = C x R x (BJ.Cat) (M17b) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Blass Bead (M34) 0.4500 Kg Spec.10.4.3(2)(e)
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 3.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Rp. 136,506.78 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.0038 M Spec.10.4.3(2)(d)
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Non Thermoplastic = C x R x (BJ.Cat) (M17a) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Blass Bead (M34) 0.4500 Kg Spec.10.4.3(2)(e)
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 3.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Rp. 125,781.78 / M2
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 1.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 96.0 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 193.5 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 32.56 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2150 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.6450 jam
- Pekerja = (Tk x P) : Qt (L01) 1.0750 jam
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 2.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 96.0 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 193.5 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 32.56 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2150 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.6450 jam
- Pekerja = (Tk x P) : Qt (L01) 1.2900 jam
1. BAHAN
1.a. Pelat Rambu Jadi (High Intensity Grade) (M35b) 1.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 96.0 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 193.5 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 32.56 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2150 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.6450 jam
- Pekerja = (Tk x P) : Qt (L01) 1.0750 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 32.56 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2150 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.6450 jam
- Pekerja = (Tk x P) : Qt (L01) 1.0750 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 20.0 Buah
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 96.0 menit
- Menurunkan = Rata-rata 1 menit / buah T3 20.0 menit
- Lain-lain = geser, atur, tunggu, dll. T4 10.0 menit
Ts 146.0 menit
3. TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1 Qt 47.75 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1466 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.5863 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1727 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 96.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 148.5 menit
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 42.42 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1650 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3300 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8250 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 96.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 148.5 menit
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 42.42 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1650 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3300 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8250 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar rel pengaman diterima di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 Km ukuran
5 Jam kerja efektif per-hari Tk 7.00 jam sesuai
6 Faktor kehilangan bahan Fh 1.00 - drawing
7 Tulangan praktis Rc 50.00 Kg/Cu.m
II. URUTAN KERJA
1 Kesatuam pondasi, pelat dan tiang rambu disiapkan dan
dipasang ditempat yang telah ditentukan
2. ALAT
2,a DUMP TRUCK (E08) (E08)
Kapasitas 1 kali Angkut Cp 15.0 M'
Waktu Siklus : Ts
- Memuat T1 50.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 96.00 menit
- Menurunkan T3 60.0 menit
- Lain-lain T4 30.0 menit
Ts 236.0 menit
3. TENAGA
Produksi pasang pagar pengaman / hari = Tk x Q1 Qt 26.69 M'
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M' :
- Mandor = (Tk x M) : Qt (L03) 0.2622 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.5244 jam
- Pekerja = (Tk x P) : Qt (L01) 2.0978 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar paku jalan diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
3. TENAGA
Produksi pasang paku jalan/ hari = Tk x Q1 Qt 20.00 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7000 jam
- Pekerja = (Tk x P) : Qt (L01) 1.7500 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar mata kucing diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
3. TENAGA
Produksi pasang mata kucing/ hari = Tk x Q1 Qt 20.00 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7000 jam
- Pekerja = (Tk x P) : Qt (L01) 1.7500 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (kerb pracetak) dicetak di base camp dan
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. FLAT BED TRUCK
Kapasitas 1 kali Angkut Cp 20.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 33.38 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 30.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 93.4 menit
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 89.96 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0778 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1556 jam
- Pekerja = (Tk x P) : Qt (L01) 0.3891 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan frontage
3 Bahan dasar ( blok beton ) telah berada di lokasi
pekerjaan / proyek
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
2.a. TAMPER (E25)
Kecepatan V 0.60 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.40 M
Banyak lintasan n 4 lintasan
Tebal lapis hamparan rata-rata tp 0.05 M
0.0000
3. TENAGA 0.24825
Produksi paving block / hari = Tk x Q1 Qt 348.60 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0201 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0803 jam
- Pekerja = (Tk x P) : Qt (L01) 0.1205 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (kerb pemisah jalan)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 100.00 Kg/M3
2. ALAT
2.a. DUMP TRUK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 96.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 141.0 menit
3. TENAGA
Produksi pasang kerb pemisah jalan / hari = Tk x Q1 Qt 29.79 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2350 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4700 jam
- Pekerja = (Tk x P) : Qt (L01) 1.8800 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 96.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 141.0 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 29.79 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2350 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4700 jam
- Pekerja = (Tk x P) : Qt (L01) 1.8800 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 24.35 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2875 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.5750 jam
- Pekerja = (Tk x P) : Qt (L01) 2.3000 jam
0.0000
0.24825
ITEM PEMBAYARAN NO. : 8.7(3) Analisa EI-873
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal
Type merkuri 250 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 96.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 141.0 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 29.79 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2350 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4700 jam
- Pekerja = (Tk x P) : Qt (L01) 1.8800 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 8.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 96.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 12.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 138.0 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 24.35 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2875 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.5750 jam
- Pekerja = (Tk x P) : Qt (L01) 2.3000 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 96.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 141.0 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 29.79 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2350 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4700 jam
- Pekerja = (Tk x P) : Qt (L01) 1.8800 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 8.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 96.00 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 12.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 138.0 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 24.35 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.2875 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.5750 jam
- Pekerja = (Tk x P) : Qt (L01) 2.3000 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar pagar pemisah pedestrian corbon steel
seluruhnya diterima di base camp
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Pipa Carbon Steel Dia 3" = (3x2)+(1.4x2) m / 3 M V1 2.93 M
8 Pipa Carbon Steel Dia 1,5" = (1.0 x 20) / 3 M V2 6.67 M
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 30.00 M
Waktu Siklus : Ts
- Memuat = atur, ikat dll rata-rata 5 menit/m T1 50.00 menit
- Angkut V=40 Km/jam = (L : V) x 60 T2 30.00 menit
- Kembali V=60 Km/jam = (L : V) x 60 T3 20.00 menit
- Menurunkan = Rata-rata 2.5 menit/m T4 25.00 menit
- Lain-lain = geser, atur, tunggu dll T5 5.00 menit
Ts 130.00 menit
3. TENAGA
Produksi penanaman rumput / hari = Tk x Q1 Qt 96.92 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Las Tb 2.00 orang
- Pekerja P 4.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0722 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1444 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2889 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar pagar pemisah pedestrian galvanised
seluruhnya diterima di base camp
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Pipa Galvanis Dia 3" = (3x2)+(1.4x2) m / 3 M V1 2.93 M
8 Pipa Galvanis Dia 1,5" = (1.0 x 20) / 3 M V2 6.67 M
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 30.00 M
Waktu Siklus : Ts
- Memuat = atur, ikat dll rata-rata 5 menit/m T1 50.00 menit
- Angkut V=40 Km/jam = Lef x V x 60 T2 30.00 menit
- Kembali V=60 Km/jam = Lef x V x 60 T3 20.00 menit
- Menurunkan = Rata-rata 2.5 menit/m T4 25.00 menit
- Lain-lain = geser, atur, tunggu dll T5 5.00 menit
Ts 130.00 menit
Kap. Prod. / Jam Cp Q1 13.8462 M
Ts : 60
3. TENAGA
Produksi penanaman rumput / hari = Tk x Q1 Qt 96.92 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Las Tb 2.00 orang
- Pekerja P 4.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0722 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1444 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2889 jam
PROYEK : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4.(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Marka Jalan Termoplastik TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4.(2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Marka Jalan Bukan Termoplastic TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4.(4) .(a) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan Permukaa
TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4.(4) .(b) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Rambu Jalan Ganda dengan Permukaan
TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-845
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4.(5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Patok Pengarah TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4.(6) .(a) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Patok Kilometer TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4.(6) .(b) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Patok Hektometer TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.00
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4.(7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Rel Pengaman TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M' % THD. BIAYA PROYEK : 0.00
A. PEKERJA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4.(8) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Paku Jalan TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.00
B. BAHAN
C. PERALATAN
Analisa EI-849
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4.(9) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Mata Kucing TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.00
B. BAHAN
C. PERALATAN
Analisa EI-8410
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4 (10) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Kerb Pracetak TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M % THD. BIAYA PROYEK : 0.00
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.4.(12) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Perkerasan Blok Beton pada Trotoar d TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
1. Pekerja Biasa (L01) jam 0.02 7,142.86 143.43
2. Tukang (L02) jam 0.08 9,285.71 745.84
3. Mandor (L03) jam 0.12 12,857.14 1,549.05
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.6(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Kerb Pracetak Pemisah Jalan (ConcreteTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.7(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
1 Tiang lampu type tunggal, Lighting Pol buah 1.00 15,665,000.00 15,665,000.00
2 Lampu sodium 250 watt buah 1.00 249,286.00 249,286.00
3 Kabel type m1 15.00 7,840.00 117,600.00
4 Beton K 250 M3 0.72 2,411,722.69 1,736,440.34
5 Reinforcing Steel deform = 56 x 1.05 Kg 58.80 14,562.50 856,275.00
6 MCB,1P, 16 A buah 1.00 36,400.00 36,400.00
7 Plat besi = 0.009x0.4x0.4x7850 M3 0.72 18,750.00 13,500.00
8 Copper Rod = 22/7 x(0.007)^2 x 1 x 78 Kg 1.21 4,480.00 5,420.80
9 Pipa PVC dia 3" M3 15.00 40,464.00 606,960.00
10 Bekisting buah 1.00 2,508,000.00 2,508,000.00
C. PERALATAN
PROYEK
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.7(2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
A. TENAGA
C. PERALATAN
PROYEK
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.7(3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
1. Beton K-300 M3 1.00 2,517,308.08 2,517,308.08
2. Besi Tulangan (Ulir) U 32 (M39)b Kg 1.00 9,000.00 9,000.00
C. PERALATAN
PROYEK
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.7(4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.7(5) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.7(6) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.8(1) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Carbon SteeTOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 8.8(2) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Galvanised TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Flat Bed Truck E11 Jam 0.0722 575,269.66 41,547.25
2. Welding Set E32 Jam 3.7091 122,856.40 455,690.15
3 Alat Bantu Ls 1.0000 0.00 0.00
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
PROYEK : : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK :
NAMA PAKET : PEMBANGUNAN JALAN PRAFI-KEBAR I
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 9.4 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
DUMP TRUCK 3-4 M3 % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM E08
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.5 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
FLAT BED TRUCK 3-4 M3 % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E11)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.6 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
WATER TANKER 3000-4500 L. % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E23)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.7 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
BULLDOZER 100-150 HP % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E04)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK : : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK :
NAMA PAKET : PEMBANGUNAN JALAN PRAFI-KEBAR I
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 9.8 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
MOTOR GRADER >100 HP % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E13)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.9 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
WHEEL LOADER 1.0-1.6 M3 % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E15)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.10 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
TRACK LOADER 75-100 HP % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E14)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.11 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
EXCAVATOR 80-140 HP % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E10)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.12 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
CRANE 10-15 TON % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E07)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.13 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
STEEL WHEEL ROLLER 6-9 T. % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E16)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK : : SATUAN KERJA PENGEMBANGAN KAWASAN PERMUKIMAN DAN PERBATASAN PROV. PAPUA BARAT
No. PAKET KONTRAK :
NAMA PAKET : PEMBANGUNAN JALAN PRAFI-KEBAR I
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : 9.14 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
VIBRATORY ROLLER 5-8 T. % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E19)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.15 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
VIBRATORY COMPACTOR % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E25)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.16 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
TIRE ROLLER 8-10 T. % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E18)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.17 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
COMPRESSOR 4000-6500 L\M % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E05)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.18 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
CONCRETE MIXER 0.3-0.6 M3 % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E06)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.19 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
WATER PUMP 70-100 mm % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM (E22)
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROP / KAB / KODYA :
ITEM PEMBAYARAN NO. : 9.20 PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : PEKERJAAN HARIAN TOTAL HARGA (Rp.) : 0.00
JACK HAMMER % THD. BIAYA PROYEK : 0.00
SATUAN PEMBAYARAN : JAM E26
A. PEKERJA
1. - - - -
2. - - - -
B. BAHAN
1. - - - -
2. - - - -
C. ALAT
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (1)
JENIS PEKERJAAN : Pemeliharaan Rutin Perkerasan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 0.12
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (2)
JENIS PEKERJAAN : Pemeliharaan Rutin Bahu Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 0.13
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (3)
JENIS PEKERJAAN : Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 0.05
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (4)
JENIS PEKERJAAN : Pemeliharaan Rutin Perlengkapan Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (5)
JENIS PEKERJAAN : Pemeliharaan Rutin Jembatan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 0.03
A. TENAGA
B. BAHAN
C. PERALATAN
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 KM
5 Tebal lapis agregat padat t 0.15 M
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Berat isi padat Bip 1.81 ton/m3
8 Berat volume agregat (lepas) Bil 1.51 ton/m3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Mencampur T1 1.00 menit
- Memuat dan lain-lain T2 0.45 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 76.81 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 537.66 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1953 jam
- Mandor = (Tk x M) : Qt (L03) 0.0130 jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.A Analisa EI-10A
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 KM
5 Tebal Lapis Hotmix padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi padat Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.40 %
11 Berat Isi bahan :
- AC-WC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
11 Jarak Stock pile ke Cold Bin l 50.00 m
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10 & 10-15" x (D1 x tM3) x Fh1) : D2 (M92) 0.0307 M3
1.b. Agr 0-5 = ("0-5" x (D1 x tM3) x Fh1) : D3 (M91) 0.0298 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 1.8514 Kg
1.d. Aspal = (AS x (D1 x tM3) x Fh2) x 1000 (M10) 5.1615 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju Vf 15.00 km/jam
Kecepatan kembali Vr 20.00 km/jam
Waktu siklus
((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75 Ts1 1.10 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.B Analisa EI-10B
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
3. TENAGA
Produksi menentukan : DUMP TRUCK Q4 0.54 M3 / Jam
Produksi ATB / hari = Tk x Q4 Qt 3.80 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 18.4357 Jam
- Mandor = (Tk x M) / Qt (L03) 3.6871 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.00 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2 Tabel 6.6.4.
- Agregat Pengunci Ap 25.00 Kg/M2 Tabel 6.6.4.
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2 Tabel 6.6.4.
As2 94.55 Kg/M3 (As1 : t)
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit Lihat panduan
Ts1 0.45 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.C Analisa EI-10C
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 20.0 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM Spec. 6.5.2 (2)
- Kadar Aspal terhadap berat total campuran As 4.50 % Tabel 6.5.3 (1)
- Tebal nominal padat t 0.04 M Tabel 6.5.3 (1)
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01 Ton/M3
- Aspal (diambil) D2 1.00 Ton/M3
- Agregat (diambil) D3 1.60 Ton/M3
7 Faktor kembang campuran Fk 1.20
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1997 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 90.4500 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts1
- Memuat T1 5.00 menit
- Mengaduk T2 3.50 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts1 13.50 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 1.844 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 12.91 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.5422 jam
- Pekerja = (Tk x P) : Qt (L01) 6.5060 jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.D Analisa EI-10D
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Rutin
SATUAN PEMBAYARAN : 10.D URAIAN ANALISA HARGA SATUAN
Lanjutan
Rp. 2,528,395.91 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 20.0 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 % 100 bagian
- Minyak Fluk / Pencair K 13.00 % 15 bagian
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Pencair D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter campuran
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 850.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus (termasuk proses pemanasan) Ts 2.00 Jam
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 352.75 liter
Produksi / hari = Tk x Q1 Qt 2,469.25 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
0,375 km 0,375 km
PETA LOKASI QUARRY
Manokwari Andai Andai- Maruni Sp. Kawat
km 000+000 Km 20+000 Km 172+900
0,50 km Ke Prafi
Pelabuhan
Catatan :
Patumbak - Medan = 10 km
Medan - Lokasi Proyek = 165.20 km
Total Sumber Quarry Patumbak s/d Lokasi Proyek = 175.20 km
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3 120,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 554,481.31
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 536,019.09
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi : Quarry
Tujuan : Base Camp
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 20.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3 126,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 554,481.31
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 536,019.09
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M02 - Batu Kali
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 20.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3 135,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 554,481.31
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 536,019.09
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam 420,128.50
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam 7,142.86
9 Berat volume batu belah Bil 1.60 ton/m3
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M06 - Batu Belah
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 3,855.67 Rupiah
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 20.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3 126,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 554,481.31
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 536,019.09
7 Berat volume gravel Bil 2.20 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M07 - Gravel
Lokasi : Quarry
Tujuan : Base Camp
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3 100,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 554,481.31
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 536,019.09
7 Berat volume sirtu Bil 1.51 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M16 - Sirtu
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 20.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 45,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 554,481.31
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 536,019.09
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M44 - Pasir Urug
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 20.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 120,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 554,481.31
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 536,019.09
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M1c- Pasir Beton
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi Base Camp L 141.00 Km
4 Harga satuan Bensin di Pertamina 1.00 Ltr
5 Harga Satuan Dasar Forklif 1.00 Jam 60,000.00
6 Harga Satuan Dasar Dump Truck 1.00 Jam 305,270.24
II. PERHITUNGAN
FORKLIF (E10)
Kapasitas Angkut V 2.00 drum
Faktor Bucket Fb 150.00 kg
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Memuat T1 3.00 menit
- Lain-lain T2 2.00 menit
Ts1 5.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 - M3 / Jam
Ts1
Bersambung
Jenis : BENSIN/SOLAR/MINYAK TANAH
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
Tenaga
Pekerja 4.00 Orang
Upah 8,571.43 Rp/jam
Biaya Tenaga 302,000.00 Rp/Ret
100.67 Rp/Ltr
Biaya Angkutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi Base Camp L 141.00 Km Manokwari
4 Harga satuan Semen di Toko RpM16 1.00 Kg 95,700.00
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 305,270.24
II. PERHITUNGAN
DUMP TRUCK (E08)
Kapasitas bak V 3,000.00 Kg
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 40.00 KM/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L/v1) x 60 T1 282.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 211.50 menit
- Muat T3 20.00 menit
- Lain-lain T4 10.00 menit
Ts2 523.50 menit
Bersambung
Jenis : SEMEN
Lokasi : Kota Manokwari
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi Base Camp L 141.00 Km
4 Harga satuan Besi di Toko RpM16 1.00 Kg 12,500.00
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 305,270.24
II. PERHITUNGAN
DUMP TRUCK (E08)
Kapasitas bak V 3,000.00 Kg
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 40.00 KM/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L/v1) x 60 T1 282.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 211.50 menit
- Muat T3 40.00 menit
- Lain-lain T4 10.00 menit
Ts2 543.50 menit
Tenaga
Pekerja 4.00 Orang
Upah 8,571.43 Rp/jam
Biaya Tenaga 310,571.43 Rp/kg
103.52 Rp/Kg
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Besi
Lokasi : Kota Manokwari
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi Base Camp L 1.00 Km
4 Harga satuan Aspal RpM16 1.00 Kg 1,500,000.00
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 305,270.24
II. PERHITUNGAN
DUMP TRUCK (E08)
Kapasitas bak V 3,000.00 Kg
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 40.00 KM/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L/v1) x 60 T1 2.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 1.50 menit
- Muat T3 40.00 menit
- Lain-lain T4 10.00 menit
Ts2 53.50 menit
Tenaga
Pekerja 4.00 Orang
Upah 8,571.43 Rp/jam
Biaya Tenaga 30,571.43 Rp/kg
197.24 Rp/Kg
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Aspal
Lokasi : Kota Manokwari
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
###
A. URAIAN PERALATAN E41
1. Jenis Peralatan ROCK DRILL BREAKER E36
2. Tenaga Pw 3.0 HP ###
3. Kapasitas Cp - - ###
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ###
c. Harga Alat B 900,000,000 Rupiah ###
###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 90,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.18062 - ###
(1 + i)^A - 1 Kondisi Alat
3. Biaya Pasti per Jam : Nilai B' dari
a. Biaya Pengembalian Modal = (B-C)xD E 97,535.76 Rupiah Depresiasi
W
###
b. Asuransi, dll = 0.002 x B F 1,200.00 Rupiah E42
W ###
###
Biaya Pasti per Jam = (E+F) G 98,735.76 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 4,096.80 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 1,881.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 52,500 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 105,000.00 Rupiah Kondisi Alat
perbaikan W Nilai B' dari
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah Depresiasi
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah
###
Biaya Operasi per Jam = (H+I+K+L+M) P 209,906.37 Rupiah E43
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 308,642.13 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 12.50 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 7,835.00 Liter ###
5. Bahan Bakar Solar Ms 9,104.00 Liter ###
6. Minyak Pelumas Mp 41,800.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
Kondisi Alat
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan COLD RECYCLER E38
2. Tenaga Pw 900.0 HP ###
3. Kapasitas Cp 2,200 M ###
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 19,500,000,000 Rupiah ###
5. ###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 1,950,000,000 Rupiah Kondisi Alat
Nilai B' dari
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.28085 - Depresiasi
(1 + i)^A - 1
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 2,464,494.19 Rupiah E45
W ###
###
b. Asuransi, dll = 0.002 x B F 19,500.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 2,483,994.19 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 1,229,040.00 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 564,300.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 853,125 Rupiah Kondisi Alat
W Nilai B' dari
Depresiasi
3. Perawatan dan = (12,5 % - 17,5 %) x B K 1,218,750.00 Rupiah
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah E46
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 3,911,643.57 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 6,395,637.76 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 12.50 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 7,835.00 Liter ###
5. Bahan Bakar Solar Ms 9,104.00 Liter ###
6. Minyak Pelumas Mp 41,800.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi Kondisi Alat
Biaya Pekerjaan Nilai B' dari
Depresiasi
###
B. BIAYA PASTI PER JAM KERJA E
1. Nilai Sisa Alat = 10 % x B C 39,500,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.28085 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 49,921.81 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 395.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 50,316.81 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA > 15th ?
Kondisi Alat
1. Bahan Bakar = (12%-15%) x Pw x Ms H 157,044.00 Rupiah Nilai B' dari
Depresiasi
###
E
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 133,714,286 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24668 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 148,430.75 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 1,337.14 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 149,767.89 Rupiah > 15th ?
Kondisi Alat
C. BIAYA OPERASI PER JAM KERJA Nilai B' dari
Depresiasi
1. Bahan Bakar = (12%-15%) x Pw x Ms H 143,388.00 Rupiah
###
E
2. Pelumas = (2.5%-3%) x Pw x Mp I 65,835.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 58,500 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 83,571.43 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 397,723.00 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 547,490.89 Rupiah ###
> 15th ?
Kondisi Alat
E. LAIN - LAIN Nilai B' dari
1. Tingkat Suku Bunga i 12.50 % / Tahun Depresiasi
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 7,835.00 Liter E
5. Bahan Bakar Solar Ms 9,104.00 Liter ###
6. Minyak Pelumas Mp 41,800.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan CONCRETE PAN MIXER E43
2. Tenaga Pw 134 HP Kondisi Alat
3. Kapasitas Cp 600.00 Liter Nilai B' dari
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun Depresiasi
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,000,000,000 Rupiah ###
E
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 100,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.18062 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 108,373.07 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 1,333.33 Rupiah ###
W > 15th ?
Kondisi Alat
Biaya Pasti per Jam = (E+F) G 109,706.40 Rupiah Nilai B' dari
Depresiasi
C. BIAYA OPERASI PER JAM KERJA
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 182,990.40 Rupiah E
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 84,018.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 58,333 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 116,666.67 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 488,436.97 Rupiah ###
> 15th ?
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 598,143.37 Rupiah Kondisi Alat
Nilai B' dari
Depresiasi
E. LAIN - LAIN
1. Tingkat Suku Bunga i 12.50 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam E
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 7,835.00 Liter ###
5. Bahan Bakar Solar Ms 9,104.00 Liter ###
6. Minyak Pelumas Mp 41,800.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
> 15th ?
A. URAIAN PERALATAN Kondisi Alat
1. Jenis Peralatan CONCRETE BREAKER E44
2. Tenaga Pw 290 HP Depresiasi
3. Kapasitas Cp 20.00 m3/jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam E
c. Harga Alat B 900,000,000 Rupiah ###
###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 90,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.28085 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 113,745.89 Rupiah ###
W ###
> 15th ?
b. Asuransi, dll = 0.002 x B F 900.00 Rupiah Kondisi Alat
W Nilai B' dari
Depresiasi
Biaya Pasti per Jam = (E+F) G 114,645.89 Rupiah
###
C. BIAYA OPERASI PER JAM KERJA E
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 396,024.00 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 181,830.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 39,375 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 56,250.00 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ###
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 32,142.86 Rupiah ###
> 15th ?
Biaya Operasi per Jam = (H+I+K+L+M) P 719,907.57 Rupiah Kondisi Alat
Nilai B' dari
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 834,553.46 Rupiah Depresiasi
###
E. LAIN - LAIN E
1. Tingkat Suku Bunga i 12.50 % / Tahun ###
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam ###
4. Bahan Bakar Bensin Mb 7,835.00 Liter ###
5. Bahan Bakar Solar Ms 9,104.00 Liter ###
6. Minyak Pelumas Mp 41,800.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
Kondisi Alat
Nilai B' dari
A. URAIAN PERALATAN Depresiasi
1. Jenis Peralatan ASPAHLT TANKER E45
2. Tenaga Pw 190 HP ###
3. Kapasitas Cp 4,000.00 liter E
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 500,000,000 Rupiah ###
###
5. Kapasitas tangki air Ca 4,000.00 liter ###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 50,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24668 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 55,502.95 Rupiah > 15th ?
W Kondisi Alat
Nilai B' dari
b. Asuransi, dll = 0.002 x B F 500.00 Rupiah Depresiasi
W
###
Biaya Pasti per Jam = (E+F) G 56,002.95 Rupiah E
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H1 259,464.00 Rupiah ###
Bahan Bakar Pemanas Aspal = 1/1000 x ca x Ms H2 36,416.00 Rupiah ###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 119,130.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 21,875 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 31,250.00 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah > 15th ?
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah Kondisi Alat
Nilai B' dari
Biaya Operasi per Jam = (H+I+K+L+M) P 493,135.00 Rupiah Depresiasi
E. LAIN - LAIN
1. Tingkat Suku Bunga i 12.50 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 7,835.00 Liter
5. Bahan Bakar Solar Ms 9,104.00 Liter
6. Minyak Pelumas Mp 41,800.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER E48
2. Tenaga Pw 4 HP
3. Kapasitas Cp 80.00 KG
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 20,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 12.50 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 7,835.00 Liter
5. Bahan Bakar Solar Ms 9,104.00 Liter
6. Minyak Pelumas Mp 41,800.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TRUK MIXER (AGITATOR) E49
2. Tenaga Pw 220 HP
3. Kapasitas Cp 5.00 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 750,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 12.50 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 7,835.00 Liter
5. Bahan Bakar Solar Ms 9,104.00 Liter
6. Minyak Pelumas Mp 41,800.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E50
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,170,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 12.50 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 7,835.00 Liter
5. Bahan Bakar Solar Ms 9,104.00 Liter
6. Minyak Pelumas Mp 41,800.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 75-100 TON E51
2. Tenaga Pw 200 HP
3. Kapasitas Cp 75.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 90,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 12.50 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 7,835.00 Liter
5. Bahan Bakar Solar Ms 9,104.00 Liter
6. Minyak Pelumas Mp 41,800.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT E52
2. Tenaga Pw 50 HP
3. Kapasitas Cp 30.00 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 500,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 12.50 % / Tahun
2. Upah Operator / Sopir U1 14,285.71 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam
4. Bahan Bakar Bensin Mb 7,835.00 Liter
5. Bahan Bakar Solar Ms 9,104.00 Liter
6. Minyak Pelumas Mp 41,800.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
KETERANGAN
Di Luar PPN
per 1 M3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : AGREGAT KELAS A :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A :
SATUAN PEMBAYARAN : M3 :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0378 420,128.50 15,862.60
2. Blending Equpment (E52) jam 0.0482 208,649.87 10,055.42
3 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : 10/KTR-KST/PKPP-PB/III/2010
NAMA PAKET : PENYUSUNAN DED TAHUN 2011 PENGEMBANGAN PS PERKOTAAN
PROP / KAB / KODYA : PAPUA BARAT/MANOKWARI
ITEM PEMBAYARAN NO. : AGREGAT KELAS B :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B :
SATUAN PEMBAYARAN : M3 :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0378 420,128.50 15,862.60
2. Blending Equpment (E52) jam 0.0482 208,649.87 10,055.42
3 Alat Bantu Ls 1.0000 0.00 0.00
I ASUMSI
1 Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Proporsi campuran : - Agregat Kasar Ak 32.50 %
- Pasir Ps 67.50 %
II METHODE PELAKSANAAN