2. 2. BAHAN MATERIAL
2. 2. BAHAN BANGUNAN
2. 2. 1. BAHAN ALAM: PASIR, BATU, KERIKIL, BATA, ASPAL, SEMEN
2. 2. 1. 6 Batu andesit bakar M2 125,000.00
2. 2. 1. 14 Batu Bata / Merah Bj 560.00
2. 2. 1. 32 Batu pecah 2-3 cm M3 155,000.00
2. 2. 1. 36 Batu pecah 10-15 cm (15-20) M3 125,000.00
2. 2. 1. 39 Batu putih pecah , 5 - 7 cm M3 105,000.00
2. 2. 1. 43 Grasak M3 70,000.00
2. 2. 1. 44 Ijuk Kg 25,000.00
2. 2. 1. 50 Pasir pasang / beton M3 90,000.00
2. 2. 1. 51 Pasir Urug M3 70,000.00
2. 2. 1. 52 PC / Portland cement Kg 1,000.00
2. 2. 1. 53 Semen Merah M3 145,000.00
2. 2. 1. 54 Semen Putih / warna Kg 2,100.00
2. 2. 1. 56 Sirtu Urug M3 60,000.00
2. 2. 1. 60 Tali ijuk Kg 35,000.00
2. 2. 1. 61 Tanah liat M3 65,000.00
2. 2. 1. 62 Tanah urug M3 55,000.00
2. 2. 1. 63 Urugan Taman M3 85,000.00
64 air 5.00
3
2. 2. 6. 28 Minyak Cat / Thiner A Ltr 30,000.00
2. 2. 6. 29 Minyak Cat / Thiner B Ltr 22,500.00
2. 2. 6. 30 Cat Interior Ltr 23,000.00
2. 2. 6. 31 Cat Eksetrior Ltr 28,000.00
2. 2. 6. 32 Oli Gardan Ltr -
2. 2. 6. 33 Oli rem Ltr -
2. 2. 6. 34 Oli Hidrolis Ltr -
2. 2. 6. 35 Oli Presneleng Ltr -
2. 2. 6. 36 Paint Stone Zak -
2. 2. 6. 37 Plamur kayu Kg 23,000.00
2. 2. 6. 38 Plamur Tembok Kg 15,000.00
2. 2. 6. 39 Politur jadi Ltr -
2. 2. 6. 40 Residu ( Ter ) Ltr -
2. 2. 6. 41 Rol kuas Bh -
2. 2. 6. 42 Sabun Kg -
2. 2. 6. 43 Sending impra ( melamine) Kg -
2. 2. 6. 44 Soda api Kg -
2. 2. 6. 45 Spiritus Ltr -
2. 2. 6. 46 Stempet / Gemuk Kg -
2. 2. 6. 47 Teak oil Ltr -
2. 2. 6. 48 Vernis Ltr 65,000.00
2. 2. 8. BAHAN SANITAIR :
2. 2. 8. 2 Avor staninlees steel Bh 45,000.00
2. 2. 8. 4 Bak Cuci Stainlesstel (Royal) Bh 200,000.00
2. 2. 8. 10 Double Kran Dupon Bh -
2. 2. 8. 12 Kloset Duduk Keramik Komplit ex.AMSTAD Bh -
2. 2. 8. 13 Kloset Duduk Keramik Komplit ex.INA Bh -
2. 2. 8. 14 Kloset Duduk Keramik Komplit ex.TOTO Bh 1,250,000.00
2. 2. 8. 15 Kloset Jongkok Keramik ex.AMSTAD Bh -
2. 2. 8. 16 Kloset Jongkok Keramik ex.INA Bh -
2. 2. 8. 29 Kran cucian dia 1/2" Bh 275,000.00
2. 2. 8. 30 Kran Dia 1/2 " stainless steel Bh 40,000.00
2. 2. 8. 31 Kran Dia 3/4 " stainless steel Bh 55,000.00
2. 2. 8. 32 Kran Dupon Bh -
2. 2. 8. 33 Kran Toto 1/2" Bh -
2. 2. 8. 34 Pipa kurasan plastik Bh -
2. 2. 8. 57 PVC AW Dia 0.5 " ( abu - abu ) M' / bhn 2,400.00
2. 2. 8. 61 PVC AW Dia 1,5 " ( abu - abu ) M' / bhn 6,500.00
2. 2. 8. 63 PVC AW Dia 2 ,5" ( abu - abu ) M' / bhn 15,000.00
2. 2. 8. 64 PVC AW Dia 3 " ( abu - abu ) M' / bhn 20,000.00
2. 2. 8. 65 PVC AW Dia 4 " ( abu - abu ) M' / bhn 25,000.00
2. 2. 8. 90 PVC (Class D) Dia 1.5 " ( abu - abu ) M' / bhn -
2. 2. 8. 91 PVC (Class D) Dia 2 " ( abu - abu ) M' / bhn -
2. 2. 8. 92 PVC (Class D) Dia 2.5 " ( abu - abu ) M' / bhn -
2. 2. 8. 93 PVC (Class D) Dia 3 " ( abu - abu ) M' / bhn -
2. 2. 8. 94 PVC (Class D) Dia 4 " ( abu - abu ) M' / bhn -
2. 2. 8. 113 Shower Dupon Set -
2. 2. 8. 114 Shower toilet Bh -
4
2. 2. 8. 115 Seal Tape Bh 4,500.00
2. 2. 8. 116 Stop Kran Dia 1.5 " Bh -
2. 2. 8. 117 Stop Kran Dia 1/2 " Bh -
2. 2. 8. 118 Stop Kran Dia 3/4 " Bh -
2. 2. 8. 119 Stop kran dia 1" kuningan Bh -
2. 2. 8. 120 Stop kran dia 1" plastik Bh -
2. 2. 8. 121 Stop kran dia 1/2" kuningan Bh -
2. 2. 8. 122 Stop kran dia 3/4" kuningan Bh -
2. 2. 8. 123 Stop Kran Ǿ 1/2" Bh -
2. 2. 8. 126 Tandon air stainlees steel kap. 1.000 ltr Bh -
2. 2. 8. 127 Tandon air stainlees steel kap. 550 ltr Bh -
2. 2. 8. 136 Tempat Sabun Keramik ex.INA Bh -
2. 2. 8. 137 Urinoir Bh -
138 Wastafel amstad Bh 500,000.00
Tulungagung, 2021
Dibuat oleh :
CV……………………..
5
…………………………..
Direktur/Direkris
6
ANALISA HARGA SATUAN PEKERJAAN
DILARANG MERUBAH KOEFISIEN
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1 Pengalian Tanah 1m3 tanah biasa sedalam 1 m
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.750 80,400.00 60,300.00
Mandor L.04 OH 0.025 80,700.00 2,017.50
JUMLAH TENAGA KERJA 62,317.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 62,317.50
E Overhead & Profit ...... % x D 1,246.35
F Harga Satuan Pekerja (D + E ) 63,563.85
A.2.3.1.9 Pengurugan Kembali 1m3 galian tanah
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.500 80,400.00 40,200.00
Mandor L.04 OH 0.050 80,700.00 4,035.00
JUMLAH TENAGA KERJA 44,235.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 44,235.00
E Overhead & Profit ...... % x D 884.70
F Harga Satuan Pekerja (D + E ) 45,119.70
A.2.3.1.11 Pengurugan 1m3 dengan Pasir urug
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.300 80,400.00 24,120.00
Mandor L.04 OH 0.010 80,700.00 807.00
JUMLAH TENAGA KERJA 24,927.00
B BAHAN
Pasir urug m3 1.200 70,000.00 84,000.00
JUMLAH HARGA BAHAN 84,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 108,927.00
E Overhead & Profit ...... % x D 2,178.54
F Harga Satuan Pekerja (D + E ) 111,105.54
A.2.3.1.15 Pengurugan 1m3 dengan tanah urug
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.250 80,400.00 20,100.00
Mandor L.04 OH 0.025 80,700.00 2,017.50
JUMLAH TENAGA KERJA 22,117.50
B BAHAN
Tanah urug m3 1.200 55,000.00 66,000.00
JUMLAH HARGA BAHAN 66,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 88,117.50
E Overhead & Profit ...... % x D 1,762.35
F Harga Satuan Pekerja (D + E ) 89,879.85
7
F Harga Satuan Pekerja (D + E ) 538,593.15
8
A.3.2.1.9 Pemasangan batu kosong ( anstamping )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.780 80,400.00 62,712.00
Tukang Batu L.02 OH 0.390 80,500.00 31,395.00
Kepala Tukang L.03 OH 0.039 80,600.00 3,143.40
Mandor L.04 OH 0.039 80,700.00 3,147.30
JUMLAH TENAGA KERJA 100,397.70
B BAHAN
Batu pecah 10-15 cm (15-20) m3 1.200 125,000.00 150,000.00
Pasir pasang / beton Kg 0.432 90,000.00 38,880.00
JUMLAH HARGA BAHAN 188,880.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 289,277.70
E Overhead & Profit ...... % x D 5,785.55
F Harga Satuan Pekerja (D + E ) 295,063.25
9
A.4.1.1.17 Pembesian 10 Kg dengan Besi polos atau ulir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.070 80,400.00 5,628.00
Tukang Besi L.02 OH 0.070 80,500.00 5,635.00
Kepala Tukang L.03 OH 0.007 80,600.00 564.20
Mandor L.04 OH 0.004 80,700.00 322.80
JUMLAH TENAGA KERJA 12,150.00
B BAHAN
Besi Beton / tulangan beton kg 10.500 9,000.00 94,500.00
Kawat Beton / bendraat kg 0.150 18,000.00 2,700.00
JUMLAH HARGA BAHAN 97,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 109,350.00
E Overhead & Profit ...... % x D 2,187.00
F Harga Satuan Pekerja (D + E ) 111,537.00
per kg 11,153.70
A.4.1.1.20 Pemasangan 1m2 Bekisting untuk pondasi
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.520 80,400.00 41,808.00
Tukang Kayu L.02 OH 0.260 80,500.00 20,930.00
Kepala Tukang L.03 OH 0.026 80,600.00 2,095.60
Mandor L.04 OH 0.026 80,700.00 2,098.20
JUMLAH TENAGA KERJA 66,931.80
B BAHAN
Kayu bekisting m3 0.040 1,100,000.00 44,000.00
Paku biasa kg 0.300 15,000.00 4,500.00
Minyak bekisting liter 0.100 6,000.00 600.00
JUMLAH HARGA BAHAN 49,100.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 116,031.80
E Overhead & Profit ...... % x D 2,320.64
F Harga Satuan Pekerja (D + E ) 118,352.44
2x pakai 59,176.22
A.4.1.1.21 Pemasangan 1m2 Bekisting untuk sloof
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.520 80,400.00 41,808.00
Tukang Kayu L.02 OH 0.260 80,500.00 20,930.00
Kepala Tukang L.03 OH 0.026 80,600.00 2,095.60
Mandor L.04 OH 0.026 80,700.00 2,098.20
JUMLAH TENAGA KERJA 66,931.80
B BAHAN
Kayu bekisting m3 0.045 1,100,000.00 49,500.00
Paku biasa kg 0.300 15,000.00 4,500.00
Minyak bekisting liter 0.100 6,000.00 600.00
JUMLAH HARGA BAHAN 54,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 121,531.80
E Overhead & Profit ...... % x D 2,430.64
F Harga Satuan Pekerja (D + E ) 123,962.44
2 x pakai 61,981.22
A.4.1.1.22 Pemasangan 1m2 Bekisting untuk kolom
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.660 80,400.00 53,064.00
Tukang Kayu L.02 OH 0.330 80,500.00 26,565.00
Kepala Tukang L.03 OH 0.033 80,600.00 2,659.80
Mandor L.04 OH 0.033 80,700.00 2,663.10
JUMLAH TENAGA KERJA 84,951.90
B BAHAN
Kayu bekisting m3 0.040 1,100,000.00 44,000.00
Paku biasa kg 0.400 15,000.00 6,000.00
Minyak bekisting liter 0.200 6,000.00 1,200.00
Kayu bekisting m3 0.015 1,100,000.00 16,500.00
Multiplek 9 mm, uk. 1,20 x 2,40 m lbr 0.350 85,000.00 29,750.00
Bambu (Dia 6 - 8 cm x 600cm) btg 2.000 10,000.00 20,000.00
JUMLAH HARGA BAHAN 117,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 202,401.90
E Overhead & Profit ...... % x D 4,048.04
F Harga Satuan Pekerja (D + E ) 206,449.94
2 x pakai 103,224.97
10
A.4.1.1.23 Pemasangan 1m2 Bekisting untuk balok
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.660 80,400.00 53,064.00
Tukang Kayu L.02 OH 0.330 80,500.00 26,565.00
Kepala Tukang L.03 OH 0.033 80,600.00 2,659.80
Mandor L.04 OH 0.033 80,700.00 2,663.10
JUMLAH TENAGA KERJA 84,951.90
B BAHAN
Kayu bekisting m3 0.040 1,100,000.00 44,000.00
Paku biasa kg 0.400 15,000.00 6,000.00
Minyak bekisting liter 0.200 6,000.00 1,200.00
Kayu bekisting m3 0.018 1,100,000.00 19,800.00
Multiplek 9 mm, uk. 1,20 x 2,40 m lbr 0.350 85,000.00 29,750.00
Bambu (Dia 6 - 8 cm x 600cm) btg 2.000 10,000.00 20,000.00
JUMLAH HARGA BAHAN 120,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 205,701.90
E Overhead & Profit ...... % x D 4,114.04
F Harga Satuan Pekerja (D + E ) 209,815.94
2x pakai 104,907.97
A.4.1.1.24 Pemasangan 1m2 Bekisting untuk lantai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.660 80,400.00 53,064.00
Tukang Kayu L.02 OH 0.330 80,500.00 26,565.00
Kepala Tukang L.03 OH 0.033 80,600.00 2,659.80
Mandor L.04 OH 0.033 80,700.00 2,663.10
JUMLAH TENAGA KERJA 84,951.90
B BAHAN
Kayu bekisting m3 0.040 1,100,000.00 44,000.00
Paku biasa kg 0.400 15,000.00 6,000.00
Minyak bekisting liter 0.200 6,000.00 1,200.00
Kayu bekisting m3 0.015 1,100,000.00 16,500.00
Multiplek 9 mm, uk. 1,20 x 2,40 m lbr 0.350 85,000.00 29,750.00
Bambu (Dia 6 - 8 cm x 600cm) btg 6.000 10,000.00 60,000.00
JUMLAH HARGA BAHAN 157,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 242,401.90
E Overhead & Profit ...... % x D 4,848.04
F Harga Satuan Pekerja (D + E ) 247,249.94
2x pakai 123,624.97
A.4.1.1.27 1m2 Pemasangan Bekisting ongkos tenaga
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.520 80,400.00 41,808.00
Tukang Kayu L.02 OH 0.260 80,500.00 20,930.00
Kepala Tukang L.03 OH 0.026 80,600.00 2,095.60
Mandor L.04 OH 0.026 80,700.00 2,098.20
JUMLAH TENAGA KERJA 66,931.80
B BAHAN
Paku biasa kg 0.300 15,000.00 4,500.00
Minyak bekisting liter 0.100 6,000.00 600.00
JUMLAH HARGA BAHAN 5,100.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 72,031.80
E Overhead & Profit ...... % x D 1,440.64
F Harga Satuan Pekerja (D + E ) 73,472.44
11
D Jumlah( A + B + C ) 114,434.75
E Overhead & Profit ...... % x D 2,288.70
F Harga Satuan Pekerja (D + E ) 116,723.45
12
A.4.2.1.13a Pemasangan 1m2 pintu kaca rangka alumunium
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.085 80,400.00 6,834.00
Tukang Las L.02 OH 0.085 80,500.00 6,842.50
Kepala Tukang L.03 OH 0.0090 80,600.00 725.40
Mandor L.04 OH 0.0050 80,700.00 403.50
JUMLAH TENAGA KERJA 14,805.40
B BAHAN
Profil daun aluminium 4" m' 4.400 95,000.00 418,000.00
Kaca Bening t= 5 mm m2 1.100 75,000.00 82,500.00
Sealant tube 0.270 25,000.00 6,750.00
JUMLAH HARGA BAHAN 507,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 522,055.40
E Overhead & Profit ...... % x D 10,441.11
F Harga Satuan Pekerja (D + E ) 532,496.51
A.4.2.1.13b Pemasangan 1m2 jendela kaca rangka alumunium
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.085 80,400.00 6,834.00
Tukang Las L.02 OH 0.085 80,500.00 6,842.50
Kepala Tukang L.03 OH 0.0090 80,600.00 725.40
Mandor L.04 OH 0.0050 80,700.00 403.50
JUMLAH TENAGA KERJA 14,805.40
B BAHAN
Profil daun aluminium 3'' m' 4.400 85,000.00 374,000.00
Kaca Bening t= 5 mm m2 1.100 75,000.00 82,500.00
Sealant tube 0.270 25,000.00 6,750.00
JUMLAH HARGA BAHAN 463,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 478,055.40
E Overhead & Profit ...... % x D 9,561.11
F Harga Satuan Pekerja (D + E ) 487,616.51
A.4.2.1.18 Pemasangan 1m' talang jurai bjls 30 lebar 90 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.200 80,400.00 16,080.00
Tukang Kayu L.02 OH 0.200 80,500.00 16,100.00
Kepala Tukang L.03 OH 0.020 80,600.00 1,612.00
Mandor L.04 OH 0.001 80,700.00 80.70
JUMLAH TENAGA KERJA 33,872.70
B BAHAN
Seng Plat BJLS 30 lebar 0,90 m m' 1.050 85,000.00 89,250.00
Paku biasa Kg 0.015 15,000.00 225.00
Kayu Tahun papan ( Mauni/akasia) m3 0.019 5,000,000.00 95,000.00
JUMLAH HARGA BAHAN 184,475.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 218,347.70
E Overhead & Profit ...... % x D 4,366.95
F Harga Satuan Pekerja (D + E ) 222,714.65
13
A.4.4.1.8 Pemasangan 1m2 dinding Batu Bata / Merah (5x11x22) tebal 1/2 bata camp 1SP : 3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.300 80,400.00 24,120.00
Tukang Batu L.02 OH 0.100 80,500.00 8,050.00
Kepala Tukang L.03 OH 0.010 80,600.00 806.00
Mandor L.04 OH 0.015 80,700.00 1,210.50
JUMLAH TENAGA KERJA 34,186.50
B BAHAN
Batu Bata / Merah bh 70.000 560.00 39,200.00
PC / Portland cement kg 14.370 1,000.00 14,370.00
Pasir pasang / beton m3 0.040 90,000.00 3,600.00
JUMLAH HARGA BAHAN 57,170.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 91,356.50
E Overhead & Profit ...... % x D 1,827.13
F Harga Satuan Pekerja (D + E ) 93,183.63
A.4.4.1.10 Pemasangan 1m2 dinding Batu Bata / Merah (5x11x22) tebal 1/2 bata camp 1SP : 5PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.300 80,400.00 24,120.00
Tukang Batu L.02 OH 0.100 80,500.00 8,050.00
Kepala Tukang L.03 OH 0.010 80,600.00 806.00
Mandor L.04 OH 0.015 80,700.00 1,210.50
JUMLAH TENAGA KERJA 34,186.50
B BAHAN
Batu Bata / Merah bh 70.000 560.00 39,200.00
PC / Portland cement kg 9.680 1,000.00 9,680.00
Pasir pasang / beton m3 0.045 90,000.00 4,050.00
JUMLAH HARGA BAHAN 52,930.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 87,116.50
E Overhead & Profit ...... % x D 1,742.33
F Harga Satuan Pekerja (D + E ) 88,858.83
14
A.4.4.2.27 Pemasangan 1m2 Acian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.200 80,400.00 16,080.00
Tukang Batu L.02 OH 0.100 80,500.00 8,050.00
Kepala Tukang L.03 OH 0.010 80,600.00 806.00
Mandor L.04 OH 0.010 80,700.00 807.00
JUMLAH TENAGA KERJA 25,743.00
B BAHAN
PC / Portland cement kg 3.250 1,000.00 3,250.00
JUMLAH HARGA BAHAN 3,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 28,993.00
E Overhead & Profit ...... % x D 579.86
F Harga Satuan Pekerja (D + E ) 29,572.86
A.4.4.2.27a 1m' Benangan
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.015 80,400.00 1,206.00
Tukang Batu L.02 OH 0.050 80,500.00 4,025.00
JUMLAH TENAGA KERJA 5,231.00
B BAHAN
PC / Portland cement kg 3.750 1,000.00 3,750.00
Pasir pasang / beton m3 0.030 90,000.00 2,700.00
JUMLAH HARGA BAHAN 6,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 11,681.00
E Overhead & Profit ...... % x D 233.62
F Harga Satuan Pekerja (D + E ) 11,914.62
15
A.4.4.3.35b Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.700 80,400.00 56,280.00
Tukang Batu L.02 OH 0.350 80,500.00 28,175.00
Kepala Tukang L.03 OH 0.035 80,600.00 2,821.00
Mandor L.04 OH 0.035 80,700.00 2,824.50
JUMLAH TENAGA KERJA 90,100.50
B BAHAN
Keramik putih Uk. 30 cm x 30 cm m2 1.0683 36,000.00 38,458.80
PC / Portland cement kg 10.0000 1,000.00 10,000.00
Pasir pasang / beton m3 0.0450 90,000.00 4,050.00
Semen Putih / warna kg 1.5000 2,100.00 3,150.00
JUMLAH HARGA BAHAN 55,658.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 145,759.30
E Overhead & Profit ...... % x D 2,915.19
F Harga Satuan Pekerja (D + E ) 148,674.49
A.4.4.3.37 Pemasangan 1m2 lantai keramik ukuran 25 cm x 25 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.700 80,400.00 56,280.00
Tukang Batu L.02 OH 0.350 80,500.00 28,175.00
Kepala Tukang L.03 OH 0.035 80,600.00 2,821.00
Mandor L.04 OH 0.035 80,700.00 2,824.50
JUMLAH TENAGA KERJA 90,100.50
B BAHAN
Keramik tekstur Uk. 25 cm x 25 cm m2 1.060 42,000.00 44,520.00
PC / Portland cement kg 10.400 1,000.00 10,400.00
Pasir pasang / beton m3 0.045 90,000.00 4,050.00
Semen Putih / warna kg 1.620 2,100.00 3,402.00
JUMLAH HARGA BAHAN 62,372.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 152,472.50
E Overhead & Profit ...... % x D 3,049.45
F Harga Satuan Pekerja (D + E ) 155,521.95
A.4.4.3.39 Pemasangan 1m' plint keramik ukuran 10 cm x 40 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.090 80,400.00 7,236.00
Tukang Batu L.02 OH 0.090 80,500.00 7,245.00
Kepala Tukang L.03 OH 0.035 80,600.00 2,821.00
Mandor L.04 OH 0.005 80,700.00 403.50
JUMLAH TENAGA KERJA 17,705.50
B BAHAN
List Keramik (10x40)cm m' 1.10 12,000.00 13,200.00
PC / Portland cement kg 1.240 1,000.00 1,240.00
Pasir pasang / beton m3 0.003 90,000.00 270.00
JUMLAH HARGA BAHAN 14,710.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 32,415.50
E Overhead & Profit ...... % x D 648.31
F Harga Satuan Pekerja (D + E ) 33,063.81
A.4.4.3.54B Pemasangan 1m2 Dinding keramik ukuran 25 cm x 40 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.900 80,400.00 72,360.00
Tukang Batu L.02 OH 0.450 80,500.00 36,225.00
Kepala Tukang L.03 OH 0.045 80,600.00 3,627.00
Mandor L.04 OH 0.045 80,700.00 3,631.50
JUMLAH TENAGA KERJA 115,843.50
B BAHAN
Keramik dinding 25 x 40 cm m2 1.060 39,000.00 41,340.00
PC / Portland cement kg 9.300 1,000.00 9,300.00
Pasir pasang / beton m3 0.018 90,000.00 1,620.00
Semen Putih / warna kg 1.940 2,100.00 4,074.00
JUMLAH HARGA BAHAN 56,334.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 172,177.50
E Overhead & Profit ...... % x D 3,443.55
F Harga Satuan Pekerja (D + E ) 175,621.05
16
A.4.4.3.58 Pemasangan 1m2 Dinding batu andesit bakar
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.900 80,400.00 72,360.00
Tukang Batu L.02 OH 0.450 80,500.00 36,225.00
Kepala Tukang L.03 OH 0.045 80,600.00 3,627.00
Mandor L.04 OH 0.045 80,700.00 3,631.50
JUMLAH TENAGA KERJA 115,843.50
B BAHAN
Batu andesit bakar m2 1.060 125,000.00 132,500.00
PC / Portland cement kg 9.300 1,000.00 9,300.00
Pasir pasang / beton m3 0.018 90,000.00 1,620.00
Semen Putih / warna kg 1.940 2,100.00 4,074.00
JUMLAH HARGA BAHAN 147,494.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 263,337.50
E Overhead & Profit ...... % x D 5,266.75
F Harga Satuan Pekerja (D + E ) 268,604.25
A.4.4.3.58d Pemasangan 1m2 Paving tebal 6 cm k225
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.250 80,400.00 20,100.00
Tukang batu L.02 OH 0.500 80,500.00 40,250.00
Kepala Tukang L.03 OH 0.050 80,600.00 4,030.00
Mandor L.04 OH 0.00130 80,700.00 104.91
JUMLAH TENAGA KERJA 64,484.91
B BAHAN
Paving Stone abu - abu t= 6 cm, K225 m2 1.100 42,000.00 46,200.00
Pasir pasang / beton m3 0.035 90,000.00 3,150.00
JUMLAH HARGA BAHAN 49,350.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 113,834.91
E Overhead & Profit ...... % x D 2,276.70
F Harga Satuan Pekerja (D + E ) 116,111.61
B BAHAN
Topi uskup/ stoper bh 3.340 65,000.00 217,100.00
Pasir pasang / beton m3 0.001 90,000.00 90.00
JUMLAH HARGA BAHAN 217,190.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 241,320.00
E Overhead & Profit ...... % x D 4,826.40
F Harga Satuan Pekerja (D + E ) 246,146.40
B BAHAN
Pipa Besi 4/4 Tebal= 1.4 mm m' 3.500 24,166.67 84,583.33
Assesoris (perkuatan,las dll) ls 1.000 5,000.00 5,000.00
JUMLAH HARGA BAHAN 89,583.33
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 132,872.43
E Overhead & Profit ...... % x D 2,657.45
F Harga Satuan Pekerja (D + E ) 135,529.88
17
A.4.5.1 SATUAN PEKERJAAN LANGIT - LANGIT ( PLAFOND)
A.4.5.1.7 Pemasangan 1m2 langit langit gypsum board (120x240x9)mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.100 80,400.00 8,040.00
Tukang Kayu L.02 OH 0.050 80,500.00 4,025.00
Kepala Tukang L.03 OH 0.005 80,600.00 403.00
Mandor L.04 OH 0.005 80,700.00 403.50
JUMLAH TENAGA KERJA 12,871.50
B BAHAN
Gypsum board tebal 9mm ( 1,2 x 2,4 m ) lbr 0.364 65,000.00 23,660.00
Paku Asbes kg 0.110 15,000.00 1,650.00
JUMLAH HARGA BAHAN 25,310.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 38,181.50
E Overhead & Profit ...... % x D 763.63
F Harga Satuan Pekerja (D + E ) 38,945.13
A.4.5.1.7A Pemasangan 1m2 langit langit Calsy board ( uk. 122 x 244 x 0.3 cm )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.100 80,400.00 8,040.00
Tukang Kayu L.02 OH 0.050 80,500.00 4,025.00
Kepala Tukang L.03 OH 0.005 80,600.00 403.00
Mandor L.04 OH 0.005 80,700.00 403.50
JUMLAH TENAGA KERJA 12,871.50
B BAHAN
Calsy bord ( uk. 122 x 244 x 0.3 cm ) lbr 0.364 65,000.00 23,660.00
Paku kalsiboard kg 0.110 15,000.00 1,650.00
JUMLAH HARGA BAHAN 25,310.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 38,181.50
E Overhead & Profit ...... % x D 763.63
F Harga Satuan Pekerja (D + E ) 38,945.13
18
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.2 Pembuatan dan Pemasangan 1m3 kusen pintu dan jendela Kayu Balau
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 7.000 80,400.00 562,800.00
Tukang Kayu L.02 OH 21.000 80,500.00 1,690,500.00
Kepala Tukang L.03 OH 2.100 80,600.00 169,260.00
Mandor L.04 OH 0.350 80,700.00 28,245.00
JUMLAH TENAGA KERJA 2,450,805.00
B BAHAN
Kayu Balau Balok m3 1.100 10,000,000.00 11,000,000.00
Paku biasa kg 1.250 15,000.00 18,750.00
Lem ( Kayu + Tembok ) kg 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 11,033,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 13,484,555.00
E Overhead & Profit ...... % x D 269,691.10
F Harga Satuan Pekerja (D + E ) 13,754,246.10
A.4.6.1.5b Pembuatan dan Pemasangan 1m2 daun pintu panil Kayu Balau
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.000 80,400.00 80,400.00
Tukang Kayu L.02 OH 3.000 80,500.00 241,500.00
Kepala Tukang L.03 OH 0.300 80,600.00 24,180.00
Mandor L.04 OH 0.050 80,700.00 4,035.00
JUMLAH TENAGA KERJA 350,115.00
B BAHAN
Kayu Balau Papan m3 0.040 12,000,000.00 480,000.00
Lem ( Kayu + Tembok ) kg 0.050 15,000.00 750.00
JUMLAH HARGA BAHAN 480,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 830,865.00
E Overhead & Profit ...... % x D 16,617.30
F Harga Satuan Pekerja (D + E ) 847,482.30
A.4.6.1.6b Pembuatan dan Pemasangan 1m2 daun pintu dan jendela Kaca Kayu Balau
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.800 80,400.00 64,320.00
Tukang Kayu L.02 OH 2.400 80,500.00 193,200.00
Kepala Tukang L.03 OH 0.240 80,600.00 19,344.00
Mandor L.04 OH 0.040 80,700.00 3,228.00
JUMLAH TENAGA KERJA 280,092.00
B BAHAN
Kayu Balau Papan m3 0.024 12,000,000.00 288,000.00
Lem ( Kayu + Tembok ) kg 0.300 15,000.00 4,500.00
JUMLAH HARGA BAHAN 292,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 572,592.00
E Overhead & Profit ...... % x D 11,451.84
F Harga Satuan Pekerja (D + E ) 584,043.84
A.4.6.1.13 Pemasangan 1m3 konstruksi kuda-kuda kayu kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 4.000 80,400.00 321,600.00
Tukang Kayu L.02 OH 12.000 80,500.00 966,000.00
Kepala Tukang L.03 OH 1.200 80,600.00 96,720.00
Mandor L.04 OH 0.200 80,700.00 16,140.00
JUMLAH TENAGA KERJA 1,400,460.00
B BAHAN
Kayu Kruing Balok m3 1.100 7,000,000.00 7,700,000.00
Besi Beugel/Baut kg 15.000 17,000.00 255,000.00
Paku biasa kg 5.600 15,000.00 84,000.00
JUMLAH HARGA BAHAN 8,039,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 9,439,460.00
E Overhead & Profit ...... % x D 188,789.20
F Harga Satuan Pekerja (D + E ) 9,628,249.20
19
A.4.6.1.15 Pemasangan 1m3 konstruksi gording kayu kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 6.700 80,400.00 538,680.00
Tukang Kayu L.02 OH 20.100 80,500.00 1,618,050.00
Kepala Tukang L.03 OH 2.010 80,600.00 162,006.00
Mandor L.04 OH 0.335 80,700.00 27,034.50
JUMLAH TENAGA KERJA 2,345,770.50
B BAHAN
Kayu Kruing Balok m3 1.100 7,000,000.00 7,700,000.00
Besi Beugel/Baut kg 15.000 17,000.00 255,000.00
Paku biasa kg 3.000 15,000.00 45,000.00
JUMLAH HARGA BAHAN 8,000,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 10,345,770.50
E Overhead & Profit ...... % x D 206,915.41
F Harga Satuan Pekerja (D + E ) 10,552,685.91
20
A.4.6.1.24 Pemasangan 1m2 rangka dinding pemisah (60x120) besi C
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.650 80,400.00 52,260.00
Tukang Kayu L.02 OH 0.095 80,500.00 7,647.50
Kepala Tukang L.03 OH 0.010 80,600.00 765.70
Mandor L.04 OH 0.006 80,700.00 468.06
JUMLAH TENAGA KERJA 61,141.26
B BAHAN
Rangka partisi C m' 4.400 15,000.00 66,000.00
Besi Beugel/Baut kg 0.150 17,000.00 2,550.00
JUMLAH HARGA BAHAN 68,550.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 129,691.26
E Overhead & Profit ( maks 14 % ) ...... % x D 2,593.83
F Harga Satuan Pekerja (D + E ) 132,285.09
21
A.4.6.2.6 Pemasangan 1 bh engsel jendela 3''
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.010 80,400.00 804.00
Tukang Kayu L.02 OH 0.100 80,500.00 8,050.00
Kepala Tukang L.03 OH 0.010 80,600.00 806.00
Mandor L.04 OH 0.0005 80,700.00 40.35
JUMLAH TENAGA KERJA 9,700.35
B BAHAN
Engsel Jendela (Arch ) bh 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 15,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 24,700.35
E Overhead & Profit ...... % x D 494.01
F Harga Satuan Pekerja (D + E ) 25,194.36
A.4.6.2.7 Pemasangan 1 set hak angin
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.100 80,400.00 8,040.00
Tukang Kayu L.02 OH 0.200 80,500.00 16,100.00
Kepala Tukang L.03 OH 0.020 80,600.00 1,612.00
Mandor L.04 OH 0.0005 80,700.00 40.35
JUMLAH TENAGA KERJA 25,792.35
B BAHAN
Hak angin/sikutan Merk SES bh 1.000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 60,792.35
E Overhead & Profit ...... % x D 1,215.85
F Harga Satuan Pekerja (D + E ) 62,008.20
A.4.6.2.8 Pemasangan 1 bh Grendel jendela
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.010 80,400.00 804.00
Tukang Kayu L.02 OH 0.100 80,500.00 8,050.00
Kepala Tukang L.03 OH 0.010 80,600.00 806.00
Mandor L.04 OH 0.0005 80,700.00 40.35
JUMLAH TENAGA KERJA 9,700.35
B BAHAN
Grendel jendela merk SES bh 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 39,700.35
E Overhead & Profit ...... % x D 794.01
F Harga Satuan Pekerja (D + E ) 40,494.36
A.4.6.2.11 Pemasangan 1 bh kunci selot ex ses
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.020 - -
Tukang Kayu L.02 OH 0.200 - -
Kepala Tukang L.03 OH 0.020 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Selot ( kunci pintu ) merk SES bh 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) -
E Overhead & Profit ...... % x D -
F Harga Satuan Pekerja (D + E ) -
22
A.4.6.2.12d Pemasangan handle pintu stainless steel besar
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.050 80,400.00 4,020.00
Tukang Kayu L.02 OH 0.500 80,500.00 40,250.00
Kepala Tukang L.03 OH 0.050 80,600.00 4,030.00
Mandor L.04 OH 0.0030 80,700.00 242.10
JUMLAH TENAGA KERJA 48,542.10
B BAHAN
Handle pintu stanless 30 cm set 1.000 160,000.00 160,000.00
JUMLAH HARGA BAHAN 160,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 208,542.10
E Overhead & Profit ...... % x D 4,170.84
F Harga Satuan Pekerja (D + E ) 212,712.94
A.4.6.2.13 Pemasangan 1 bh door stop
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.010 - -
Tukang Kayu L.02 OH 0.100 - -
Kepala Tukang L.03 OH 0.010 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Door Stoper Stainless bh 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) -
E Overhead & Profit ...... % x D -
F Harga Satuan Pekerja (D + E ) -
23
A.4.7.1.10 1m2 pengecatan tembok baru (1lapis plamur, 1lapis cat dasar , 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.020 80,400.00 1,608.00
Tukang cat L.02 OH 0.063 80,500.00 5,071.50
Kepala Tukang L.03 OH 0.0063 80,600.00 507.78
Mandor L.04 OH 0.0030 80,700.00 242.10
JUMLAH TENAGA KERJA 7,429.38
B BAHAN
Plamur Tembok kg 0.100 15,000.00 1,500.00
Cat Tembok kg 0.100 20,000.00 2,000.00
Cat Tembok kg 0.260 20,000.00 5,200.00
JUMLAH HARGA BAHAN 8,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 16,129.38
E Overhead & Profit ...... % x D 322.59
F Harga Satuan Pekerja (D + E ) 16,451.97
A.4.7.1.10b 1m2 pengecatan tembok baru (1lapis plamur, 1lapis cat dasar , 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.020 80,400.00 1,608.00
Tukang cat L.02 OH 0.063 80,500.00 5,071.50
Kepala Tukang L.03 OH 0.0063 80,600.00 507.78
Mandor L.04 OH 0.0030 80,700.00 242.10
JUMLAH TENAGA KERJA 7,429.38
B BAHAN
Plamur Tembok kg 0.100 15,000.00 1,500.00
Cat Tembok interior premium kg 0.100 23,000.00 2,300.00
Cat Tembok interior premium kg 0.260 23,000.00 5,980.00
JUMLAH HARGA BAHAN 9,780.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 17,209.38
E Overhead & Profit ...... % x D 344.19
F Harga Satuan Pekerja (D + E ) 17,553.57
A.4.7.1.10c 1m2 pengecatan tembok baru (1lapis plamur, 1lapis cat dasar , 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.020 80,400.00 1,608.00
Tukang cat L.02 OH 0.063 80,500.00 5,071.50
Kepala Tukang L.03 OH 0.0063 80,600.00 507.78
Mandor L.04 OH 0.0030 80,700.00 242.10
JUMLAH TENAGA KERJA 7,429.38
B BAHAN
Plamur Tembok kg 0.100 15,000.00 1,500.00
Cat Tembok exterior wheathershield kg 0.100 28,000.00 2,800.00
Cat Tembok exterior wheathershield kg 0.260 28,000.00 7,280.00
JUMLAH HARGA BAHAN 11,580.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 19,009.38
E Overhead & Profit ...... % x D 380.19
F Harga Satuan Pekerja (D + E ) 19,389.57
A.4.7.1.11 1m2 pengecatan tembok lama (1lapis cat dasar , 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.028 80,400.00 2,251.20
Tukang cat L.02 OH 0.042 80,500.00 3,381.00
Kepala Tukang L.03 OH 0.0042 80,600.00 338.52
Mandor L.04 OH 0.0030 80,700.00 242.10
JUMLAH TENAGA KERJA 6,212.82
B BAHAN
Cat Tembok interior premium kg 0.120 23,000.00 2,760.00
Cat Tembok interior premium kg 0.180 23,000.00 4,140.00
JUMLAH HARGA BAHAN 6,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 13,112.82
E Overhead & Profit ...... % x D 262.26
F Harga Satuan Pekerja (D + E ) 13,375.08
24
A.4.7.1.10d 1m2 pengecatan Langit langit ( plafond )
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.020 80,400.00 1,608.00
Tukang cat L.02 OH 0.063 80,500.00 5,071.50
Kepala Tukang L.03 OH 0.0063 80,600.00 507.78
Mandor L.04 OH 0.0030 80,700.00 242.10
JUMLAH TENAGA KERJA 7,429.38
B BAHAN
Cat Tembok kg 0.100 20,000.00 2,000.00
Cat Tembok kg 0.260 20,000.00 5,200.00
JUMLAH HARGA BAHAN 7,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 14,629.38
E Overhead & Profit ...... % x D 292.59
F Harga Satuan Pekerja (D + E ) 14,921.97
25
A.4.7.1.12c 1m2 Pengecatan genteng
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.0280 - -
Tukang cat L.02 OH 0.0420 - -
Kepala Tukang L.03 OH 0.0042 - -
Mandor L.04 OH 0.0025 - -
JUMLAH TENAGA KERJA -
B BAHAN
Cat genteng kg 0.120 - -
Cat genteng ltr 0.180 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) -
E Overhead & Profit ...... % x D -
F Harga Satuan Pekerja (D + E ) -
26
A.5.1.1.5 Pemasangan 1 bh wastafel
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 1.200 80,400.00 96,480.00
Tukang Batu L.02 OH 1.450 80,500.00 116,725.00
Kepala Tukang L.03 OH 0.1500 80,600.00 12,090.00
Mandor L.04 OH 0.0600 80,700.00 4,842.00
JUMLAH TENAGA KERJA 230,137.00
B BAHAN
Wastafel amstad Bh 1.200 500,000.00 600,000.00
PC / Portland cement kg 6.000 1,000.00 6,000.00
Pasir pasang / beton m3 0.010 90,000.00 900.00
Perlengkapan % 20.000 500,000.00 100,000.00
JUMLAH HARGA BAHAN 706,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 937,037.00
E Overhead & Profit ...... % x D 18,740.74
F Harga Satuan Pekerja (D + E ) 955,777.74
A.5.1.1.12 Pemasangan 1 bh bak cuci piring stainlesssteel
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.030 80,400.00 2,412.00
Tukang Batu L.02 OH 0.300 80,500.00 24,150.00
Kepala Tukang L.03 OH 0.0300 80,600.00 2,418.00
Mandor L.04 OH 0.0150 80,700.00 1,210.50
JUMLAH TENAGA KERJA 30,190.50
B BAHAN
Bak Cuci Stainlesstel (Royal) unit 1.000 200,000.00 200,000.00
Kran cucian dia 1/2" bh 1.000 275,000.00 275,000.00
JUMLAH HARGA BAHAN 475,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 505,190.50
E Overhead & Profit ...... % x D 10,103.81
F Harga Satuan Pekerja (D + E ) 515,294.31
A.5.1.1.14 Pemasangan 1 bh floor drain stainlees steel
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.010 80,400.00 804.00
Tukang Batu L.02 OH 0.100 80,500.00 8,050.00
Kepala Tukang L.03 OH 0.0100 80,600.00 806.00
Mandor L.04 OH 0.0050 80,700.00 403.50
JUMLAH TENAGA KERJA 10,063.50
B BAHAN
Avor staninlees steel unit 1.000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 55,063.50
E Overhead & Profit ...... % x D 1,101.27
F Harga Satuan Pekerja (D + E ) 56,164.77
A.5.1.1.14b Pemasangan 1 bh floor drain
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.010 - -
Tukang Batu L.02 OH 0.100 - -
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Avor plastik / floor drain unit 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) -
E Overhead & Profit ...... % x D -
F Harga Satuan Pekerja (D + E ) -
27
A.5.1.1.15 Pemasangan 1 bh bak kontrol pasangan bata 30 x30 tinggi 35 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 2.160 80,400.00 173,664.00
Tukang Batu L.02 OH 0.720 80,500.00 57,960.00
Kepala Tukang L.03 OH 0.0720 80,600.00 5,803.20
Mandor L.04 OH 0.0011 80,700.00 88.77
JUMLAH TENAGA KERJA 237,515.97
B BAHAN
Batu Bata / Merah bh 40.000 560.00 22,400.00
PC / Portland cement kg 44.000 1,000.00 44,000.00
Pasir pasang / beton m3 0.070 90,000.00 6,300.00
Pasir pasang / beton m3 0.060 90,000.00 5,400.00
Batu pecah 2-3 cm m3 0.070 155,000.00 10,850.00
Besi Beton / tulangan beton kg 1.600 9,000.00 14,400.00
JUMLAH HARGA BAHAN 103,350.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 340,865.97
E Overhead & Profit ...... % x D 6,817.32
F Harga Satuan Pekerja (D + E ) 347,683.29
A.5.1.1.16 Pemasangan 1 bh bak kontrol pasangan bata 45 x45 tinggi 50 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 3.200 - -
Tukang Batu L.02 OH 1.150 - -
Kepala Tukang L.03 OH 0.0110 - -
Mandor L.04 OH 0.0160 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Bata / Merah bh 70.000 - -
PC / Portland cement kg 77.000 - -
Pasir pasang / beton m3 0.130 - -
Pasir pasang / beton m3 0.090 - -
Batu pecah 2-3 cm m3 0.020 - -
Besi Beton / tulangan beton kg 2.600 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) -
E Overhead & Profit ...... % x D -
F Harga Satuan Pekerja (D + E ) -
28
A.5.1.1.25 Pemasangan 1 m' pipa pvc type AW diameter 1/2''
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.036 80,400.00 2,894.40
Tukang Pipa L.02 OH 0.060 80,500.00 4,830.00
Kepala Tukang L.03 OH 0.0060 80,600.00 483.60
Mandor L.04 OH 0.0020 80,700.00 161.40
JUMLAH TENAGA KERJA 8,369.40
B BAHAN
PVC AW Dia 0.5 " ( abu - abu ) bh 1.200 2,400.00 2,880.00
perlengkapan % 35.000 2,400.00 840.00
JUMLAH HARGA BAHAN 3,720.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 12,089.40
E Overhead & Profit ...... % x D 241.79
F Harga Satuan Pekerja (D + E ) 12,331.19
A.5.1.1.28 Pemasangan 1 m' pipa pvc type AW diameter 1.5''
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.054 80,400.00 4,341.60
Tukang Pipa L.02 OH 0.090 80,500.00 7,245.00
Kepala Tukang L.03 OH 0.0090 80,600.00 725.40
Mandor L.04 OH 0.0030 80,700.00 242.10
JUMLAH TENAGA KERJA 12,554.10
B BAHAN
PVC AW Dia 1,5 " ( abu - abu ) bh 1.200 6,500.00 7,800.00
perlengkapan % 35.000 6,500.00 2,275.00
JUMLAH HARGA BAHAN 10,075.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 22,629.10
E Overhead & Profit ...... % x D 452.58
F Harga Satuan Pekerja (D + E ) 23,081.68
29
A.5.1.1.32 Pemasangan 1 m' pipa pvc type AW diameter 4''
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
( Rp) ( Rp)
A TENAGA
Pekerja / Buruh tak terlatih L.01 OH 0.081 80,400.00 6,512.40
Tukang Pipa L.02 OH 0.135 80,500.00 10,867.50
Kepala Tukang L.03 OH 0.0135 80,600.00 1,088.10
Mandor L.04 OH 0.0040 80,700.00 322.80
JUMLAH TENAGA KERJA 18,790.80
B BAHAN
PVC AW Dia 4 " ( abu - abu ) bh 1.200 25,000.00 30,000.00
perlengkapan % 35.000 25,000.00 8,750.00
JUMLAH HARGA BAHAN 38,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) 57,540.80
E Overhead & Profit ...... % x D 1,150.82
F Harga Satuan Pekerja (D + E ) 58,691.62
B BAHAN
Shower Dupon bh 1.000 - -
sealtape kg 0.025 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) -
E Overhead & Profit ...... % x D -
F Harga Satuan Pekerja (D + E ) -
B BAHAN
kran Dupon bh 1.000 - -
sealtape kg 0.025 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah( A + B + C ) -
E Overhead & Profit ...... % x D -
F Harga Satuan Pekerja (D + E ) -
30
DAFTAR KUANTITAS HARGA (BOQ)
NAMA PEKERJAAN : PENAMBAHAN RUANG UPTD PUSKESMAS SEMBUNG
LOKASI : KECAMATAN TULUNGAGUNG KABUPATEN TULUNGAGUNG
SUMBER DANA : TAHUN 2021
NAMA PERUSAHAAN : CV………………………
31
B Membuat beton k175 - - -
1 Beton - - -
a Sloof A.4.1.1.5 2.52 m3 670,985.99 1,690,884.69 169,088.47 1,859,973.16
b Kolom A.4.1.1.5 6.59 m3 670,985.99 4,421,797.66 442,179.77 4,863,977.43
c Balok latai, balok overstek, balok talang A.4.1.1.5 5.42 m3 670,985.99 3,636,744.05 363,674.41 4,000,418.46
d Plat overstek, plat talang, dan meja beton A.4.1.1.5 6.58 m3 670,985.99 4,415,087.80 441,508.78 4,856,596.58
e Ring balok A.4.1.1.5 2.59 m3 670,985.99 1,737,853.71 173,785.37 1,911,639.08
2 Pembesian - - -
a Sloof A.4.1.1.17 289.67 kg 11,153.70 3,230,892.28 323,089.23 3,553,981.51
b Kolom A.4.1.1.17 1,345.63 kg 11,153.70 15,008,753.33 1,500,875.33 16,509,628.66
c Balok latai, balok overstek, balok talang A.4.1.1.17 747.84 kg 11,153.70 8,341,183.01 834,118.30 9,175,301.31
d Plat overstek, plat talang, dan meja beton A.4.1.1.17 415.62 kg 11,153.70 4,635,700.79 463,570.08 5,099,270.87
e Ring balok A.4.1.1.17 445.00 kg 11,153.70 4,963,396.50 496,339.65 5,459,736.15
3 Membuat bekisting - - -
a Sloof A.4.1.1.21 11.09 m2 61,981.22 687,247.75 68,724.77 755,972.52
b Kolom A.4.1.1.21 31.11 m2 61,981.22 1,928,235.69 192,823.57 2,121,059.26
c Balok latai, balok overstek, balok talang A.4.1.1.21 21.14 m2 61,981.22 1,310,282.95 131,028.29 1,441,311.24
d Plat overstek, plat talang, dan meja beton A.4.1.1.21 23.15 m2 61,981.22 1,434,865.20 143,486.52 1,578,351.72
e Ring balok A.4.1.1.21 14.26 m2 61,981.22 883,852.17 88,385.22 972,237.39
C membuat bekisting ( ongkos tenaga ) A.4.1.1.27 344.84 m2 73,472.44 25,336,381.78 2,533,638.18 27,870,019.95
D membongkar bekisting dan menyiram beton Hs 94.50 m3 7,500.00 708,750.00 70,875.00 779,625.00
E Rabat beton A.4.1.1.1 26.92 m3 594,038.21 15,991,508.56 1,599,150.86 17,590,659.42
JUMLAH 305,469,043.03 30,546,904.30 336,015,947.33
VI PEKERJAAN RANGKA ATAP
1 Pas. Rangka atap baja ringan 325.84 m2 160,000.00 52,134,400.00 5,213,440.00 57,347,840.00
JUMLAH 52,134,400.00 5,213,440.00 57,347,840.00
VII PEKERJAAN PENUTUP ATAP
1 Pas. Genteng Mantili A.4.5.2.1 325.84 m2 70,734.55 23,048,146.42 2,304,814.64 25,352,961.07
2 Pas. Bubungan A.4.5.2.4 36.50 m' 82,531.67 3,012,405.88 301,240.59 3,313,646.47
3 Pas. Mainan bubungan tempat ground Hs 2.00 bh 275,000.00 550,000.00 55,000.00 605,000.00
4 Pas. Kalsiplank 20 cm Hs 42.00 m' 30,000.00 1,260,000.00 126,000.00 1,386,000.00
5 Pas. Atap galvalum rangka hollow Hs 23.00 m2 300,000.00 6,900,000.00 690,000.00 7,590,000.00
JUMLAH 34,770,552.31 3,477,055.23 38,247,607.54
VIII PEKERJAAN PLAFOND
1 Pas. Rangka plafond metal furing A.4.6.1.19a 275.09 m2 88,490.10 24,342,741.61 2,434,274.16 26,777,015.77
2 Pas. Gypsumboard A.4.5.1.7 275.09 m2 38,945.13 10,713,415.81 1,071,341.58 11,784,757.39
JUMLAH 35,056,157.42 3,505,615.74 38,561,773.16
IX PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pas. Keramik lantai 40 x 40 cm motif A.4.4.3.4 442.23 m2 148,399.09 65,626,527.80 6,562,652.78 72,189,180.58
2 Pas. Keramik lantai 40 x 40 cm tekstur A.4.4.3.4b 29.60 m2 154,891.18 4,584,778.99 458,477.90 5,043,256.89
3 Pas. Keramik lantai 30 x 30 cm polos tambal sulam A.4.4.3.35b 16.61 m2 148,674.49 2,469,483.21 246,948.32 2,716,431.53
4 Pas. Keramik lantai kamar mandi 25 x 25 cm tekstur A.4.4.3.37 24.80 m2 155,521.95 3,856,944.36 385,694.44 4,242,638.80
5 Pas. Plint keramik ukuran 10 cm x 40 cm A.4.4.3.39 297.15 m' 33,063.81 9,824,911.14 982,491.11 10,807,402.26
6 Pas. Keramik dinding 25 x 40 cm motif A.4.4.3.54B 123.12 m2 175,621.05 21,622,463.68 2,162,246.37 23,784,710.04
7 Pas. Batu andesit bakar A.4.4.3.58 4.19 m2 268,604.25 1,125,451.81 112,545.18 1,237,996.99
8 Pas. Paving tebal 6 cm k225 A.4.4.3.58d 50.40 m2 116,111.61 5,852,025.05 585,202.51 6,437,227.56
JUMLAH 114,962,586.04 11,496,258.60 126,458,844.64
X PEKERJAAN SANITASI
1 Pas. Pipa air bersih dia 1,5" A.5.1.1.28 53.00 m' 23,081.68 1,223,329.15 122,332.91 1,345,662.06
2 Pas. Pipa air bersih dia 1/2" A.5.1.1.25 30.50 m' 12,331.19 376,101.23 37,610.12 413,711.36
3 Pas. Pipa air hujan 2,5 '' A.5.1.1.30 64.00 m' 42,881.62 2,744,423.42 274,442.34 3,018,865.77
4 Pas. Pipa air kotor dia 3" A.5.1.1.31 132.50 m' 50,786.62 6,729,226.62 672,922.66 7,402,149.28
5 Pas. Biopori Hs 10.00 bh 100,000.00 1,000,000.00 100,000.00 1,100,000.00
6 Pas. Pipa kotoran dia 4" A.5.1.1.32 63.50 m' 58,691.62 3,726,917.62 372,691.76 4,099,609.38
7 Pas. Kloset duduk monoblok toto A.5.1.1.1 10.00 Bh 1,726,439.76 17,264,397.60 1,726,439.76 18,990,837.36
8 Pas. Shower kloset Hs 10.00 Bh 95,000.00 950,000.00 95,000.00 1,045,000.00
9 Tandon air stainlees steel kap. 1.100 ltr ex profil Hs 1.00 Bh 3,000,000.00 3,000,000.00 300,000.00 3,300,000.00
10 Sumur bor Hs 1.00 Ls 5,000,000.00 5,000,000.00 500,000.00 5,500,000.00
11 Pompa air Hs 1.00 Bh 1,500,000.00 1,500,000.00 150,000.00 1,650,000.00
12 Pas. Wastafel besar lengkap ex amstad A.5.1.1.5 7.00 Bh 955,777.74 6,690,444.18 669,044.42 7,359,488.60
13 Pas. Kran dia 1/2" A.5.1.1.16 13.00 Bh 78,175.61 1,016,282.87 101,628.29 1,117,911.15
14 Pas. Avor stainlees steel A.5.1.1.14 10.00 Bh 56,164.77 561,647.70 56,164.77 617,812.47
15 Pas. Bak kontrol 30 x 30 x 35 cm A.5.1.1.15 10.00 Bh 347,683.29 3,476,832.89 347,683.29 3,824,516.18
16 Pas. Bak cuci stainless steel lengkap A.5.1.1.12 3.00 Bh 515,294.31 1,545,882.93 154,588.29 1,700,471.22
17 Pas. Stop kran 1.5 '' Hs 2.00 Bh 95,000.00 190,000.00 19,000.00 209,000.00
18 Septictank Hs 2.00 Ls 2,000,000.00 4,000,000.00 400,000.00 4,400,000.00
JUMLAH 60,995,486.21 6,099,548.62 67,095,034.83
XI PEKERJAAN LISTRIK
1 Pas. Instalasi lampu Hs 61.00 titik 65,000.00 3,965,000.00 396,500.00 4,361,500.00
2 Pas. Instalasi stop kontak Hs 51.00 titik 65,000.00 3,315,000.00 331,500.00 3,646,500.00
3 Pas. Stop kontak panasonic Hs 51.00 Bh 25,000.00 1,275,000.00 127,500.00 1,402,500.00
4 Pas. Saklar ganda panasonic Hs 27.00 Bh 25,000.00 675,000.00 67,500.00 742,500.00
5 Pas. Saklar tunggal panasonic Hs 36.00 Bh 15,000.00 540,000.00 54,000.00 594,000.00
6 Pas. Saklar hotel (tangga) Hs 1.00 Set 50,000.00 50,000.00 5,000.00 55,000.00
7 Pas. Lampu led 10 w Hs 49.00 Bh 45,000.00 2,205,000.00 220,500.00 2,425,500.00
8 Pas. Lampu led 5 w Hs 12.00 Bh 28,000.00 336,000.00 33,600.00 369,600.00
9 Pas. Downlight led 9 w Hs 29.00 Bh 38,000.00 1,102,000.00 110,200.00 1,212,200.00
10 Pas. Ground Hs 3.00 Bh 135,000.00 405,000.00 40,500.00 445,500.00
11 Kabel penangkal petir Hs 30.00 m' 45,000.00 1,350,000.00 135,000.00 1,485,000.00
12 Pas. Operspaning Hs 1.00 Ls 500,000.00 500,000.00 50,000.00 550,000.00
13 Pas. Panel group Hs 2.00 Ls 200,000.00 400,000.00 40,000.00 440,000.00
14 Pas. Pipa wifi Hs 1.00 Ls 300,000.00 300,000.00 30,000.00 330,000.00
15 Pas. Exhausfan 25/25 Hs 1.00 bh 300,000.00 300,000.00 30,000.00 330,000.00
16 Pas. Lampu spot light Hs 1.00 bh 110,000.00 110,000.00 11,000.00 121,000.00
JUMLAH 16,828,000.00 1,682,800.00 18,510,800.00
XII PEKERJAAN CAT CATAN
1 Cat dinding baru interior premium A.4.7.1.10b 1832.01 m2 17,553.57 32,158,311.38 3,215,831.14 35,374,142.52
2 Cat dinding lama interior premium A.4.7.1.11 308.80 m2 13,375.08 4,130,223.59 413,022.36 4,543,245.95
3 Cat plafond A.4.7.1.10d 726.75 m2 14,921.97 10,844,539.95 1,084,454.00 11,928,993.95
4 Cat kayu A.4.7.1.4 29.96 m2 43,807.16 1,312,462.63 131,246.26 1,443,708.90
5 Pelapisan aquaproof A.4.7.1.10c 59.35 m2 25,784.97 1,530,337.83 153,033.78 1,683,371.61
6 Couting batu hias A.4.7.1.12b 4.19 m2 36,816.29 154,260.25 15,426.02 169,686.27
JUMLAH 50,130,135.63 5,013,013.56 55,143,149.19
XIII PEKERJAAN LAIN - LAIN
1 Meja resepsionis dan apotek serta pembatas bahan acrylic 2 mm Hs 6.80 m' 700,000.00 4,760,000.00 476,000.00 5,236,000.00
JUMLAH 4,760,000.00 476,000.00 5,236,000.00
Terbilang : …………………………………..
32
Tulungagung, 2021
Dibuat oleh :
CV……………………..
33
REKAPITULASI DAFTAR KUANTITAS HARGA (BOQ)
NAMA PEKERJAAN : PENAMBAHAN RUANG UPTD PUSKESMAS SEMBUNG
LOKASI : KECAMATAN TULUNGAGUNG KABUPATEN TULUNGAGUNG
SUMBER DANA : TAHUN 2021
NAMA PERUSAHAAN : CV………………………
Tulungagung, 2021
Dibuat oleh :
CV……………………..
…………………………..
Direktur/Direkris