HARGA DASAR UPAH DAN BAHAN

A DAFTAR HARGA DASAR UPAH

HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5

1 Mandor Hari
2 Pekerja Hari
3 Tukang Hari
4 Kepala Tukang Hari

B DAFTAR HARGA DASAR BAHAN

HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5

I BAHAN BATU DAN TANAH


1 Tanah urug M3
2 Pasir urug M3
3 Pasir pasangan (Tenggarong) M3
4 Koral palu M3
5 Koral Long Iram M3
6 Batu gunung M3
7 Semen (Portland Cement) 40 Kg Zak

II BAHAN BESI DAN PAKU


1 Paku Biasa Kg
2 Besi Tulangan (Polos) Kg
3 Besi Tulangan (Ulir) Kg
4 Kawat Beton / Bendrat Kg

III BAHAN KAYU


1 Papan Ulin M3
2 Balok Ulin Ukuran 10/10 cm M3
3 Balok Ulin Ukuran 5/5 cm dan 5/7 cm M3
4 Balok Meranti M3

VII BAHAN CAT CATAN


1 Cat Air Putih Kg
2 Plamir dinding Merk "Paragon" Kg
3 Kertas Gosok Lembar

1 Alat Bantu ( Set @ 3 Unit ) Set


REKAPITULASI HARGA ANALISA SATUAN

KODE HARGA
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp)

A PEKERJAAN PENDAHULUAN
- Mengukur dan Memasang Bouplank M1 A1
- Pekerjaan Pagar Proyek M1 A2

B PEKERJAAN PASIR DAN TANAH


- Galian Tanah Biasa M3 B1
- Galian Tanah Cadas M3 B2
- Galian Tanah Keras M3 B3
- Galian Tanah Lumpur M3 B4
- Tanah Diangkut Sejauh 30 M M3 B5
- Tanah Diangkut Dari Dalam Lubang Yang Dalamnya Lebih 1 m M3 B6
- Tanah Lumpur Diangkut Dari Lubang Yang Dalamnya Lebih 1 m M3 B7
- Tanah Urug Diratakan M3 B8
- Urugan Pasir Dengan Penyiraman M3 B9
- Upah Urugan Pasir Yang Dipadatkan M3 B 10
- Urugan Tanah Bawah Lantai M3 B 11
- Urugan Tanah kembali Bekas Galian M3 B 12
- Jalan Kerikil Lebar 4 M1/ 4 M2 M2 B 13

C PEKERJAAN PONDASI
- Cerucuk Ulin uk 10/10 P=2M, Dicincin, Dilancipkan & Ditumbuk Sebuah C 1.1
- Cerucuk Ulin uk 10/10 P=4M, Dicincin, Dilancipkan & Ditumbuk Sebuah C.1.2
- Cerucuk Ulin uk 10/10 P=6M, Dicincin, Dilancipkan & Ditumbuk Sebuah C.1.3
- Kalang Dan Sunduk Ulin M3 C.1.4
- Upah Pancangan Tiang Kedalaman 1 m M1 C2
- Tiang Pancang Kayu Ulin 20/20 cm Kedalaman 8 M Sebuah C 2.1
- Tiang Pancang Kayu Ulin 20/20 cm Kedalaman 6 M Sebuah C 2.2
- Tiang Pancang Kayu Ulin 20/20 cm Kedalaman 4 M Sebuah C 2.3
- Tiang Pancang Kayu Ulin 15/15 cm Kedalaman 6 M Sebuah C 2.4
- Tiang Pancang Kayu Ulin 15/15 cm Kedalaman 4 M Sebuah C 2.5
- Upah Membuat Kepala Dan Meruncingkan Tiang Sebuah C3
- Menumbuk Tiang Ukuran 10/10 cm Pada Tanah Biasa Dalam 1 M M1 C4
- Pasangan Batu Kosong /Aanstamping (Batu Gunung) M3 C5
- Pasangan Batu Kosong /Aanstamping (Batu Cadas) M3 C 5.1
- Pasangan Batu Gunung 1 : 4 M3 C6
- Pasangan Batu Cadas 1 : 4 M3 C 6.1

D PEKERJAAN PASANGAN DINDING


- Pasangan Batu Bata Campuran 1 Pc : 1 Ps M2 D1
- Pasangan Batu Bata Campuran 1 Pc : 2 Ps M2 D2
- Pasangan Batu Bata Campuran 1 Pc : 3 Ps M2 D3
- Pasangan Batu Bata Campuran 1 Pc : 4 Ps M2 D4
- Pasangan Batu Bata Campuran 1 Pc : 5 Ps M2 D5
- Pasangan Bataco Camp 1 Pc : 5 Ps Tebal 10 Cm M2 D7
- Pasangan Bolvent List M2 D8
- Pasangan Roster M2 D9
- Pasangan Grass Block M2 D 10
- Dinding Kawat Harmonika Dicor Tebal 3 cm M2 D 11
KODE HARGA
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp)

E PEKERJAAN PLESTERAN DINDING


- Plesteran Dinding 1 Pc : 1 Ps Tebal 1 cm M2 E1
- Plesteran Dinding 1 Pc : 2 Ps Tebal 1 cm M2 E2
- Plesteran Dinding 1 Pc : 3 Ps Tebal 1 cm M2 E3
- Plesteran Dinding 1 Pc : 4 Ps Tebal 1 cm M2 E4
- Plesteran Dinding 1 Pc : 5 Ps Tebal 1 cm M2 E5
- Plesteran Dinding 1 Pc : 6 Ps Tebal 1 cm M2 E6
- Plesteran Dinding 1 Pc : 2 Ps Tebal 1.5 cm M2 E7
- Plesteran Dinding 1 Pc : 3 Ps Tebal 1.5 cm M2 E8
- Plesteran Dinding 1 Pc : 4 Ps Tebal 1.5 cm M2 E9
- Pekerjaan Sponagen M1 E 10

F PEKERJAAN PASANGAN LANTAI DAN DINDING KERAMIK


- Pasangan Lantai Marmer 60/60 cm M2 F1
- Pasangan Lantai Marmer 40/40 cm M2 F2
- Pasangan Lantai Keramik 40/40 cm M2 F3
- Pasangan Lantai Keramik 30/30 cm M2 F4
- Pasangan Lantai Keramik 20/20 cm M2 F5
- Pasangan Lantai Teraso 30/30 cm M2 F6
- Pasangan Lantai Tegel Abu-abu 20/20 cm M2 F7
- Pasangan Lantai Porselen 11/11 cm M2 F8
- Pasangan Lantai Paving Block (14 Buah) M2 F9
- Pasangan Cor Lantai Dengan Kawat Harmonika Tebal 3 Cm M2 F 10
- Pasangan Dinding Marmer M2 F 11
- Pasangan Dinding WC/Km Keramik 20/25 cm M2 F 12
- Pasangan Dinding WC/Km Keramik 20/20 cm M2 F 13
- Pasangan Plint Lantai Keramik 10/30 cm M1 F 14
- Pasangan Plint Lantai Keramik 10/40 cm M1 F 15

G PEKERJAAN BETON
- Beton Cor Batu Palu Camp 1 : 3 : 5 M3 G1
- Beton Cor Batu Long Iram Camp 1 : 3 : 5 M3 G 1.1
- Beton Cor Batu Palu Camp 1 : 2 : 3 M3 G2
- Beton Cor Batu Long Iram Camp 1 : 2 : 3 M3 G 2.1
- Pekerjaan Besi Beton 100 Kg (Besi Ulir) Kg G3
- Pekerjaan Besi Beton 100 Kg (Polos Ulir) Kg G 3.1
- Pekerjaan Pemasangan Dan Penempatan Besi Beton 100 kg Kg G4
- Pekerjaan Begisting 10 M2 M3 G5
- Beton Bertulang (Koral Palu, Besi Ulir 80 Kg) M3 G6
- Beton Bertulang (Koral Palu, Besi Ulir 100 Kg) M3 G 6.1
- Beton Bertulang (Koral Palu, Besi Ulir 160 Kg) M3 G 6.2
- Beton Bertulang (Koral Palu, Besi Ulir 200 Kg) M3 G 6.3
- Beton Bertulang (Koral Palu, Besi Ulir 250 Kg) M3 G 6.4
- Beton Bertulang (Koral Palu, Besi Polos 80 Kg) M3 G7
- Beton Bertulang (Koral Palu, Besi Polos 100 Kg) M3 G 7.1
- Beton Bertulang (Koral Palu, Besi Polos 160 Kg) M3 G 7.2
- Beton Bertulang (Koral Palu, Besi Polos 200 Kg) M3 G 7.3
- Beton Bertulang (Koral Palu, Besi Polos 250 Kg) M3 G 7.4
- Beton Bertulang (Koral Long Iram, Besi Ulir 80 Kg) M3 G8
- Beton Bertulang (Koral Long Iram, Besi Ulir 100 Kg) M3 G 8.1
- Beton Bertulang (Koral Long Iram, Besi Ulir 160 Kg) M3 G 8.2
- Beton Bertulang (Koral Long Iram, Besi Ulir 200 Kg) M3 G 8.3
- Beton Bertulang (Koral Long Iram, Besi Ulir 250 Kg) M3 G 8.4
- Beton Bertulang (Koral Long Iram, Besi Polos 80 Kg) M3 G9
- Beton Bertulang (Koral Long Iram, Besi Polos 100 Kg) M3 G 9.1
- Beton Bertulang (Koral Long Iram, Besi Polos 160 Kg) M3 G 9.2
- Beton Bertulang (Koral Long Iram, Besi Polos 200 Kg) M3 G 9.3
- Beton Bertulang (Koral Long Iram, Besi Polos 250 Kg) M3 G 9.4
KODE HARGA
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp)

H PEKERJAAN KAYU
- Tongkat Ulin Tinggi 10/10 Cm Tinggi 1 m Muka Tanah
(Dicincin, Dilancipkan dan Ditumbuk) Sebuah H1
- Tongkat Ulin Tinggi 10/10 Cm Tinggi 2 - 3 m Muka Tanah
(Dicincin, Dilancipkan dan Ditumbuk) Sebuah H 1.1
- Memasang Sunduk Ulin 5/10 dan Kalang Ulin 5/20 M H2
- Memasang Sloof Kayu Ulin 10/10 cm M H3
- Memasang Gelagar kayu Ulin 10/10 cm dan 5/10 cm M2 H4
- Mengerjakan Lantai Papan Ulin 2/20 cm M2 H5
- Mengerjakan Lantai Papan Kapur/bengkirai 2/20 cm M2 H 5.1
- Mengerjakan Lantai Papan Ulin 2.5/20 cm M2 H 5.2
- Mengerjakan Lantai Papan Kapur/bengkirai 2.5/20 cm M2 H 5.3
- Mengerjakan Lantai Papan Ulin 2/20 cm (Halus Permukaan)(* M2 H6
- Mengerjakan Lantai Papan Kapur/bengkirai 2/20 cm (* M2 H 6.1
- Mengerjakan Lantai Papan Ulin 2.5/20 cm (* M2 H 6.2
- Mengerjakan Lantai Papan Kapur/bengkirai 2.5/20 cm (* M2 H 6.3
- Mengerjakan Tiang Pokok Kayu ulin Uk. 10/10 cm M3 H7
- Mengerjakan Tiang Pokok Kayu ulin Uk. 10/10 cm (Diketam + Rotter) M3 H8
- Mengerjakan Skoor/Suai Ulin 5/10 M3 H2a
- Mengerjakan Belabat Dan Tiang Sekunder Kayu Kapur M3 H9
- Mengerjakan Belabat Dan Tiang Sekunder Kayu Meranti M3 H 9.1
- Mengerjakan Kosen Kayu Ulin (Bangunan Konstruksi Kayu) M3 H 10
- Mengerjakan Kosen Kayu Kapur (Bangunan Konstruksi Kayu) M3 H 10.1
- Mengerjakan Kosen Kayu Kapur (Bangunan Konstruksi Beton) M3 H 11
- Mengerjakan Dinding Papan Meranti 2/20 cm M2 H 12
- Mengerjakan Dinding Papan Meranti 2/20 cm (Pakai Alur/Halus) M2 H 12.1
- Mengerjakan Dinding Papan Kapur 2/20 cm M2 H 13
- Mengerjakan Dinding Papan Kapur 2/20 cm (Pakai Alur/Halus) M2 H 13.1
- Mengerjakan Dinding Papan Ulin 2/20 cm M2 H 14
- Mengerjakan Dinding Papan Ulin 2/20 cm (Pakai Alur/Halus) M2 H14.1
- Mengerjakan Dinding Plywood Tebal 4 mm M2 H 15
- Mengerjakan Dinding Plywood Tebal 4 mm (Rangka + 1 Sisi) M2 H 16
- Mengerjakan Dinding Plywood Tebal 4 mm (Rangka + 2 Sisi) M2 H 17
- Mengerjakan Ringbalk & Moorplat Kayu Ulin 10/10 cm M1 H 18
- Mengerjakan Kandang Rase Kayu Ulin Ukuran 5/5 dan 5/7 cm (T = 0.75 M) M1 H 19
- Mengerjakan Jembatan Ulin (Penghubung) M2 -

I MENGERJAKAN RANGKA KAP KUDA-KUDA


- Mengerjakan Kuda-Kuda Rentang 7 M M3 I1
- Mengerjakan Kuda-Kuda Rentang lebih 7 M M3 I2

J MENGERJAKAN RANGKA PENUTUP ATAP


- Memasang Rangka Atap Genteng M2 J1
- Memasang Rangka Atap Sirap M2 J2
- Memasang Rangka Atap Sakura, Surya dan Multi Roof/colour M2 J3
- Memasang Rangka Atap Genteng Seng, Asbes dan Tiluk M2 J4

K PEKERJAAN PENUTUP ATAP


- Memasang Atap Genteng Pres Mini Garuda Beton (9 Buah) M2 K1
- Memasang Atap Genteng Pres Garuda S Beton (11 Buah) M2 K2
- Memasang Atap Genteng Pres Garuda B (9 Buah) M2 K3
- Memasang Atap Genteng Karang Pilang (11 Buah) M2 K4
- Memasang Atap Genteng Karang Pilang (9 Buah) M2 K5
- Memasang Atap Sirap M2 K6
- Memasang Atap Seng Gelombang BJLS 25 M2 K7
- Memasang Atap Seng Gelombang BJLS 20 M2 K 7.1
- Memasang Atap Seng Asbes Gelombang M2 K8
- Memasang Atap Tiluk M2 K9
- Memasang Atap Sakura Colour (Classic) M2 K 10
- Memasang Atap Surya Colour (Classic) M2 K 10.1
- Memasang Atap Multi Colour (Classic) M2 K 10.2
KODE HARGA
NO URAIAN PEKERJAAN SATUAN
ANALISA (Rp)

L PEKERJAAN BUBUNGAN DAN LISPLANK


- Memasang Bubungan Atap Sirap M1 L1
- Memasang Bubungan Atap Seng M1 L2
- Memasang Bubungan Atap Sakura (Model C) M1 L3
- Memasang Bubungan Atap Surya (Model C) M1 L 3.1
- Memasang Bubungan Atap Sakura (Model U) M1 L4
- Memasang Bubungan Atap Surya (Model U) M1 L 4.1
- Memasang Bubungan Genteng Pres (Kecil) M1 L5
- Memasang Bubungan Genteng Pres (Besar) M1 L 5.1
- Memasang Bubungan Genteng Tiluk M1 L6
- Papan Lisplank (Kayu Kapur) M2 L7

M PEKERJAAN RANGKA DAN PENUTUP PLAFOND


- Penggantung Dan Rangka Plafond Gypsum M2 M1
- Penggantung Dan Rangka Plafond Plywood M2 M2
- Plafond Gypsum Board M2 M3
- Plafond Lembar Coll M2 M4
- Plafond Plywood Tebal 4 mm M2 M5
- Plafond Plywood Tebal 4 mm dan Rangka M2 M6
- Plafond Lamber Sering M2 M7

N PEKERJAAN CAT-CATAN
- Mengecat Dengan Cat Kilat "Aftelak" M2 N1
- Mengecat Dinding Dengan Cat Tembok "Paragon" M2 N2
- Mengecat Atap Dengan Cat Atap Genteng M2 N3
- Mengecat Dengan Cat Meni Kayu/Atap Seng M2 N4
- Mengecat Plituran M2 N5
- Mengerjakan Cat Melamin (Finishing Deko) M2 N6
DAFTAR ANALISA PEKERJAAN
KODE HARGA HARGA JUMLAH
INDEKS SATUAN URAIAN
ANALISA SATUAN (Rp) BAHAN (Rp) UPAH (Rp) HARGA (Rp)

B1 1M 3 GALIAN TANAH BIASA

0.6000 OH Pekerja - -
0.0300 OH Mandor - -
0.1000 Paket Alat Bantu - -
- - -

B9 1M 3 URUGAN PASIR DENGAN PENYIRAMAN

1.2000 M3 Pasir Urugan - -


0.3000 OH Pekerja - -
0.0100 OH Mandor - -
0.0500 Paket Alat Bantu - -
- - -

B10 1M UPAH URUGAN PASIR DAN DIPADATKAN


3

0.1800 OH Pekerja - -
0.0080 OH Mandor - -
0.0500 Paket Alat Bantu - -
- - -

B11 1M 3 URUGAN TANAH BAWAH LANTAI

1.2000 M3 Tanah Urugan - -


0.2200 OH Pekerja - -
0.0100 OH Mandor - -
0.0500 Paket Alat Bantu - -
- - -

B12 1M URUGAN TANAH KEMBALI BEKAS GALIAN


3

1.0000 B11 - -

- - -

C1.1 TTK CERUCUK ULIN UK. 10/10 P=2 M, DICINCANG, DILANCIPKAN DAN DITUMBUK

0.0200 M3 Balok Ulin 10/10 - -


0.2900 OH Tukang - -
0.0290 OH Kepala Tukang - -
0.5000 OH Pekerja - -
0.0250 OH Mandor - -
0.0500 Paket Alat Bantu - -
- - -

C.1.4 1 M3 PEKERJAAN SUNDUK/KALANG ULIN

1.1000 M3 Kayu Ulin - -


16.0000 OH Tukang - -
1.6000 OH Kepala Tukang - -
6.0000 OH Pekerja - -
0.3000 OH Mandor - -
0.0500 Paket Alat Bantu - -
- - -
C5 1 M3 PASANGAN BATU KOSONG/AANSTAMPING (BATU GUNUNG)

1.2000 M3 Batu Gunung - -


0.3000 M3 Pasir Urugan - -
0.8500 OH Pekerja - -
0.0420 OH Mandor - -
0.1000 Paket Alat Bantu - -
- - -

C6 PASANGAN BATU GUNUNG 1 Pc : 4 Ps

1.2000 M3 Batu Gunung - -


4.0720 Zak Semen Pc - -
0.5220 M3 Pasir Pasangan - -
0.0750 OH Tukang - -
0.0800 OH Kepala Tukang - -
2.6000 OH Pekerja - -
0.1300 OH Mandor - -
0.2000 Paket Alat Bantu - -
- - -
KODE HARGA HARGA JUMLAH
INDEKS SATUAN URAIAN
ANALISA SATUAN (Rp) BAHAN (Rp) UPAH (Rp) HARGA (Rp)
GI 1 M3 BETON COR BATU PALU CAMP 1 : 3 : 5

5.6650 Zak Semen Pc - -


0.5440 M3 Pasir Pasangan - -
0.9700 M3 Koral Palu - -
0.3300 OH Tukang - -
0.0330 OH Kepala Tukang - -
3.5000 OH Pekerja - -
0.1800 OH Mandor - -
1.0000 Paket Alat Bantu - -
- - -
G 1.1 1 M3 BETON COR BATU LONG IRAM CAMP 1 : 3 : 5

5.6650 Zak Semen Pc - -


0.5440 M3 Pasir Pasangan - -
0.9700 M3 Koral Long Iram - -
1.0000 Upah diambil sama dengan G 1 - -

- - -

G2 1 M3 BETON COR BATU PALU CAMP 1 : 2 : 3

9.0000 Zak Semen Pc - -


0.5400 M3 Pasir Pasangan - -
0.8200 M3 Koral Palu - -
0.5000 OH Tukang - -
0.0500 OH Kepala Tukang - -
5.0000 OH Pekerja - -
0.2500 OH Mandor - -
1.0000 Paket Alat Bantu - -
- - -
G 2.1 1 M3 BETON COR BATU LONG IRAM CAMP 1 : 2 : 3

9.0000 Zak Semen Pc - -


0.5400 M3 Pasir Pasangan - -
0.8200 M3 Koral Long Iram - -
1.0000 Upah diambil sama dengan G 2 - -

- - -
G3 100 KG PEKERJAAN BESI BETON (BESI ULIR)

110.0000 KG Besi Ulir - -


2.0000 KG Kawat Beton - -
5.0000 OH Tukang - -
2.0000 OH Kepala Tukang - -
5.0000 OH Pekerja - -
1.0000 Paket Alat Bantu - -
- - -
G 3.1 100 KG PEKERJAAN BESI BETON (BESI POLOS)

110.0000 KG Besi Polos - -


2.5000 KG Kawat Beton - -
5.0000 OH Tukang - -
2.0000 OH Kepala Tukang - -
5.0000 OH Pekerja - -
1.0000 Paket Alat Bantu - -
- - -
G4 100 KG PEKERJAAN MEMASANG DAN PENEMPATAN BESI BETON

0.5000 OH Tukang - -
2.5000 OH Pekerja - -

- - -
KODE HARGA HARGA JUMLAH
INDEKS SATUAN URAIAN
ANALISA SATUAN (Rp) BAHAN (Rp) UPAH (Rp) HARGA (Rp)
G5 1 M2 PEKERJAAN BEGISTING

0.4000 M3 Kayu Meranti - -


4.0000 Kg Paku Biasa - -
1.7500 OH Tukang - -
0.4000 OH Kepala Tukang - -
1.7500 OH Pekerja - -
0.1000 OH Mandor - -
0.5000 Paket Alat Bantu - -
- - -
G 9.2 1 M3 BETON BERTULANG 1 : 2 : 3 (BAHAN LONG IRAM) BERAT BESI POLOS = 160 Kg / M3

1.0000 M3 Cor Beton (G 2.1) - -


1.6000 Kg Besi Polos (G 3.1) - -
1.6000 Pek. Pemasangan (G4) - -
1.0000 Pek. Begisting (G5) - -

- - -
N2 1 M2 MENGECAT DINDING DENGAN CAT TEMBOK "PARAGON"

0.3700 Kg Cat Tembok Merk "Paragon" - -


0.2500 Kg Plamur - -
1.0000 Lmb Kertas Gosok - -
0.0700 OH Tukang - -
0.0070 OH Kepala Tukang - -
0.0500 OH Pekerja - -
0.0020 OH Mandor - -
0.0500 Paket Alat Bantu - -
- - -
RENCANA ANGGARAN BIAYA
( RAB )

PROYEK
PEKERJAAN
LOKASI

KODE HARGA JUMLAH


NO URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6 7

A PEKERJAAN PENDAHULUAN

1 Pengukuran dan Pematokan 1.000 Ls - 0.00 0.00


2 Papan Nama Proyek 1.000 Ls - 0.00 0.00
3 Dokumentasi dan Administrasi 1.000 Ls - 0.00 0.00
4 Barak Kerja 1.000 Ls - 0.00 0.00

SUB JUMLAH A 0.00

B PEKERJAAN PASIR DAN TANAH

1 Galian Tanah Pondasi 3.194 M3 B,1 0.00 0.00


2 Urugan Tanah Kembali 2.511 M3 B,12 0.00 0.00

SUB JUMLAH B 0.00

C PEKERJAAN PASANGAN

1 Pasangan Pondasi Batu Gunung 1 PC : 4 Psr 0.462 M3 C,6 0.00 0.00


2 Urugan Pasir dan penyiraman bawah Pondasi 0.065 M3 B,9 0.00 0.00
3 Aanstamping Bawah Pondasi 0.156 M3 C, 5.1 0.00 0.00
4 Pancang Ulin 10/10 - 200 21.80 Ttk C,1.2 0.00 0.00
5 Kalang Papan Ulin 2 x 2/20 + Sunduk ulin 5/10 0.03 M3 C,1.4 0.00 0.00

SUB JUMLAH C 0.00

D PEKERJAAN BETON & DINDING

1 Foor Plat 0.683 M3 H, 3 0.00 0.00


2 Sloof 15/20 0.060 M3 0.00 0.00
3 Kolom Beton 30/30 0.576 M3 0.00 0.00
4 Kolom Beton 20/20 0.096 M3 0.00 0.00
5 Balok 15/20 0.135 M3 - 0.00 0.00
6 Ring Balk 12/12 0.060 M3 0.00 0.00
7 Pasangan Bata 5.600 M2 - 0.00 0.00
8 Plesteran Dinding 11.200 M2 0.00 0.00
9 Fhinishing Kolom / Benangan Kolom 1.000 Ls 0.00 0.00

SUB JUMLAH D 0.00

E PEKERJAAN CAT- CATAN

1 Cat Dinding 20.800 M2 - 0.00 0.00

SUB JUMLAH E 0.00


REKAPITULASI

PROYEK 0
PEKERJAAN 0
LOKASI 0

SUB JUMLAH JUMLAH


NO URAIAN PEKERJAAN HARGA HARGA
(Rp.) (Rp.)
1 2 3 4

A PEKERJAAN PENDAHULUAN 0.00

B PEKERJAAN PASIR DAN TANAH 0.00

C PEKERJAAN PASANGAN 0.00

D PEKERJAAN BETON & DINDING 0.00

E PEKERJAAN CAT- CATAN 0.00

JUMLAH 0.00
PPn 10 % 0.00
JUMLAH 0.00
DIBULATKAN 0.00
UNTUK 1 UNIT 0.00

TERBILANG :
-

150,000.00
250,000.00
162,000.00

562,000.00

475,300.00
68,512.50

543,812.50

5,549,583.38
149,310.00
1,046,416.00

6,745,309.38

941,500.00 #VALUE!

302,000.00 4 1.58

369,950.00 #VALUE! 0.39

2.250 8,240,430.65 4 0.887

1,000,000.00

1,000,000.00
4.51
#VALUE!

#VALUE!

#VALUE!

#VALUE!

Anda mungkin juga menyukai