Anda di halaman 1dari 9

DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KOTA PALEMBANG

NO. SATUAN HARGA


I. UPAH.
1 Pekerja Orang/hari
2 Mandor Orang/hari
3 Kepala Tukang Orang/hari
4 Tukang Kayu/batu Orang/hari
5 Tukang Pipa Orang/hari
6 Tukang Besi Orang/hari
7 Tukang Las Orang/hari
8 Jaga Malam Orang/hari
9 Operator / Masinis Orang/hari
10 Mekanik Orang/hari
11 Sopir Orang/hari
II. BAHAN BANGUNAN
1 Pasir pasang M3
2 Pasir Urug M3
3 Koral M3
4 Semen @ 50 kg Zak
5 Semen warna Kg
6 Batu pecah 2/3 (split) M3
7 Batu pecah 3/5 M3
8 Batu pecah 5/7 M3
9 Batu pecah tersaring / Filler Abu Batu M3
10 Besi beton Kg
11 Kawat Beton Kg
12 Buis Beton 60 Cm Unit
13 Paku Kg
14 Cat warna (cat Minyak) Kg
15 Cat Meni besi Lt
16 Kawat Las Dos
17 Cat tembok plafond Kg
18 Aspal Kg
19 Kayu kelas II M3
20 Kayu kelas III M3
21 Kayu kelas IV M3
22 Kayu Gelam dia. 10 cm Btg
23 Batu bata Buah
24 Minyak pengencer Kg
25 Plat 5 mm Kg
26 Minyak aspal Liter
27 Solar Liter
28 Minyak Bensin Liter
29 Mesin Gerinda Hr
30 Cat Dasar Kg
31 Plamir Kg
32 Minyak Bekisting Liter
33 Kunci Tanam Mutu Baik Bh
34 Plywood tebal 4 mm Kp
35 Kawat Bronjong Kg
36 Batu Kali M3
37 Pipa GIP dia. 40 mm M'
38 Bubungan asbes gelombang M'
39 Paku Seng alumunium Bh
40 Paku Asbes Bh
41 Oli Ltr
42 Besi Beugeul dia. 16 mm Btg
43 Playwood 3 mm M'
44 Tanah Urug pilihan M3
45 Sewa alat sambung pipa HDPE Jam
46 Sewa genset Jam
47 Kuas Bh
Lokasi KOTA PALEMBANG
ANALISA HARGA SATUAN KODE
PROVINSI SUMATERA SELATAN PENGUKURAN DAN PEMASANGAN BOUWPLANK 1,1
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Tukang 0,100 1 0,100
2 Pekerja 0,100 1 0,100
3 Kepala Tukang 0,010 1 0,010
4 Mandor Lapangan 0,005 1 0,005
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Kayu Klass IV (UKURAN 5/7) 0,012 M3
2 Paku Biasa 0,020 Kg
3 Kayu Klas IV (UKURAN 3/20) 0,007 M3
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M' HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN GALIAN TANAH BIASA ( DALAM 1 M ) 1,2
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 0,750 1 0,750
2 Mandor Lapangan 0,025 1 0,025
PEKERJA
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN GALIAN TANAH KERAS ( DALAM 1 M ) 1,3
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 1,000 1 1,000
2 Mandor Lapangan 0,032 1 0,032
PEKERJA
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN TANAH URUGAN DIDATANGKAN / PERATAAN DAN PEMADATAN TANAH 1,4
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 0,500 1 0,500
2 Mandor Lapangan 0,050 1 0,050
5 Tanah pilihan 1,000 M3 1,000
PEKERJA
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN URUGAN / PERATAAN DAN PEMADATAN TANAH 1,5
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 0,500 1 0,500
2 Mandor Lapangan 0,050 1 0,050
PEKERJA
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)
ANALISA HARGA SATUAN KODE
PROVINSI SUMATERA SELATAN URUGAN PASIR DI PADATKAN 1,6
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 0,300 1 0,300
2 Mandor Lapangan 0,010 1 0,010
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Pasir Urug 1,200 M3
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN BETON ADUKAN 1:3:5 1,7
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 1,650 1 1,650
2 Mandor Lapangan 0,083 1 0,083
3 Tukang Batu 0,275 1 0,275
4 Kepala Tukang 0,028 1 0,028
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Koral 0,870 M3
2 Semen 4,360 Zak
3 Pasir Pasang 0,520 M3
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN BETON ADUKAN 1:2:3 1,8
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 1,650 1 1,650
2 Mandor Lapangan 0,083 1 0,083
3 Tukang Batu 0,275 1 0,275
4 Kepala Tukang 0,028 1 0,028
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Koral 0,900 M3
2 Semen 5,600 Zak
3 Pasir Pasang 0,450 M3
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN PEMBESIAN BETON 1,9
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 0,007 1 0,007
2 Tukang Besi 0,007 1 0,007
3 Kepala Tukang 0,0007 1 0,0007
4 Mandor 0,0004 1 0,0004
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Besi Beton 1,050 Kg
2 Kawat Beton 0,015 Kg
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN Kg HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN BEKISTING KAYU CETAKAN 1,10
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 0,300 1 0,300
2 Tukang Kayu 0,330 1 0,330
3 Kepala Tukang 0,033 1 0,033
4 Mandor 0,006 1 0,006
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Paku 0,400 Kg
2 Kayu / Papan Bekisting 0,040 M3
3 Minyak Bekisting 0,200 Ltr
4 Playwood 4 mm 0,350 Lbr
5 Kayu dolken/gelam dia. 10 cm 2,000 Btg
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M2 HARGA SATUAN (Rp.)
ANALISA HARGA SATUAN KODE
PROVINSI SUMATERA SELATAN PEMBONGKARAN BEKISTING 1,11
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 2,400 1 2,400
2 Mandor 0,120 1 0,120
PEKERJA
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN BETON BERTULANG AD. 1:2:3 ( 100 KG) 1,12
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Membuat Beton Ad. 1 Pc : 2 Ps : 3 Krl 1,000 M3
2 Tulangan Besi 105,000 Kg
3 Pasangan Bekisting kayu Cetakan 8,000 M2
4 Pembongkaran Bekisting 1,000 set
MATERIAL
SUB TOTAL
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN BETON K - 225 1,13
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 1,650 1 1,650
2 Mandor Lapangan 0,083 1 0,083
3 Tukang Batu 0,275 1 0,275
4 Kepala Tukang 0,028 1 0,028
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Koral 1,047 M3
2 Semen 7,420 Zak
3 Pasir Pasang 0,698 M3
4 Air kerja 215,000 Litr
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN PASANGAN BATU BATA AD. 1:3 1,30
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 3,600 1 3,600
2 Tukang Batu 1,200 1 1,200
3 Kepala Tukang 0,120 1 0,120
4 Mandor 0,180 1 0,180
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Batu bata Lobang 686,000 Bh
2 Semen ( Portland cemnet) 3,954 Zak
3 Pasir Pasang 0,546 M3
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)
ANALISA HARGA SATUAN KODE
PROVINSI SUMATERA SELATAN PASANGAN BATU BATA AD. 1:4 1,31
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 4,500 1 1,800
2 Tukang Batu 1,500 1 0,600
3 Kepala Tukang 0,150 1 0,060
4 Mandor 0,225 1 0,090
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Batu bata Lobang 686,000 Bh
2 Semen ( Portland cemnet) 0,230 Zak
3 Pasir Pasang 0,258 M3
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN PLESTERAN AD. 1:3 ( TEBAL 15 CM ) 1,32
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 0,300 1 0,300
2 Tukang Batu 0,150 1 0,150
3 Kepala Tukang 0,015 1 0,015
4 Mandor 0,015 1 0,015
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Semen ( Portland cemnet) 0,156 Zak
2 Pasir Pasang 0,023 M3
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M2 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN PLESTERAN AD. 1:4 ( TEBAL 15 CM ) 1,33
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 0,300 1 0,300
2 Tukang Batu 0,150 1 0,150
3 Kepala Tukang 0,015 1 0,015
4 Mandor 0,015 1 0,015
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Semen ( Portland cemnet) 0,125 Zak
2 Pasir Pasang 0,024 M3
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M2 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN PEKERJAAN CERUCUK GELAM 1,36
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Tukang 0,040 1 0,040
2 Kepala Tukang 0,004 1 0,004
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Kayu Gelam 1,000 Btg
2 Alat tumbuk 0,030 Bh
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN Btg HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN PEMBUANGAN TANAH/LUMPUR BEKAS GALIAN 1,38
NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL
(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 0,330 1 0,330
2 Mandor 0,010 1 0,010

NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL


SATUAN (Rp/Unit) (Rp.) (Rp.)

1 alat bantu 1,000 Ls


MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M3 HARGA SATUAN (Rp.)

ANALISA HARGA SATUAN KODE


PROVINSI SUMATERA SELATAN PASANGAN BATU KALI ADUKAN 1:4 1,40

NO PEKERJA VOL HARI JUMLAH UPAH BIAYA SUB TOTAL


(Hari -Orang) (Rp/Org/Hari) (Rp.) (Rp.)
1 Pekerja 1,500 1 1,500
2 Tukang Batu 0,600 1 0,600
3 Kepala Tukang 0,060 1 0,060
4 Mandor 0,075 1 0,075
PEKERJA
NO MATERIAL JUMLAH VOLUME HARGA SAT. BIAYA SUB TOTAL
SATUAN (Rp/Unit) (Rp.) (Rp.)
1 Batu Kali 1,100 M3
2 Semen ( Portland cemnet) 3,260 Zak
3 Pasir Pasang 0,520 M3
MATERIAL
SUB TOTAL
OVER HEAD+PROFIT (15%)
TOTAL
VOLUME / QUANTITY 1,00 SATUAN M2 HARGA SATUAN (Rp.)
BILL OF QUANTITY
PEKERJAAN : PENINGKATAN JALAN LINGKUNGAN LGR. MASJID TL.KARET
KEL.SENTOSA RW.10 KEC. SU II PALEMBANG
LOKASI : KOTA PALEMBANG
TAHUN ANGGARAN : 2017
SUMBER DANA : APBD PROVINSI SUMATERA SELATAN

NO URAIAN PEKERJAAN VOLUME HARGA JUMLAH


SATUAN HARGA
I PEKERJAAN KONSTRUKSI
PEKERJAAN TANAH
1,1 Pekerjaan Pemadatan dan perataan tanah 62,50 M2
1,2 Urugan pasir 6,45
, M3
II PEKERJAAN COR BETON AD 1 :2 :3 LENGKAP DENGAN BEGESTI
2,1 Cor Beton ad 1 : 2 : 3 254,00 M3
2,2 Alat bantu 1,00 Ls

Sub Total
BILL OF QUANTITY

PEKERJAAN = PENINGKATAN JALAN LINGKUNGAN LGR. MASJID TL.KARET


KEL.SENTOSA RW.10 KEC. SU II PALEMBANG
LOKASI = KOTA PALEMBANG
TAHUN ANGGARAN = 2017
SUMBER DANA = APBD PROVINSI SUMATERA SELATAN

NOMOR URAIAN PEKERJAAN JUMLAH HARGA

1 3

I PEKERJAAN PERSIAPAN
1,1 Mobilisasi peralatan dan personil
1,2 Pengukuran dan pemasangan patok
1,3 Dokumentasi dan Pelaporan
1,4 Keamanan
1,5 Papan Nama Proyek

II PEKERJAAN PEMBUATAN SALURAN SALURAN

2,1 Pekerjaan pembuatan saluran drainase

III PEKERJAAN PENYELESAIAN

3,1 Pembersihan sisa pekerjaan


3,2 As Built Drawing

SUB TOTAL
DIBULATKAN
PPN 10 %

TOTAL

Terbilang :

DIBUAT OLEH
CV/PT

DIREKTUR

Anda mungkin juga menyukai