DAFTAR HARGA SATUAN UPAH DAN BAHAN

PROGRAM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT DESA (P3MD)


KECAMATAN ......................... KABUPATEN LAMPUNG UTARA

Harga Satuan Sesudah Pajak


No Uraian Satuan
(Rp.)

I UPAH
1 Pekerja hok 80,000
2 Tukang hok 100,000
3 Tukang Siram Aspal hok 100,000
4 Kepala Tukang hok 100,000
5 Operator hok 100,000
6 Pembantu Operator hok 60,000
7 Mandor hok 100,000

II BAHAN
1 Batu Pecah 3/5 mm m3
2 Batu Pecah 2/3 mm m3
3 Batu Pecah 1/2 mm m3
5 Batu Belah m3
6 Abu Batu m3
7 Aspal ESSO drum
8 Batu Split m3
9 Semen zak
10 Kayu Bakar m3
11 Minyak Bakar ltr
12 Kayu Kelas III (Papan) m3
13 Kayu Kelas II (Balok) m3
14 Plywood tebal 9 mm lbr
15 Pasir Urug m3
16 Pasir Pasang m3
17 Paku kg
18 Besi 10 btg
19 Besi 8 btg
20 Besi 6 btg
21 Bata Merah bh
22 Pipa PVC AW 4" btg
23 Pipa PVC AW 1 1/4" btg
24 Pipa PVC AW 1" btg
25 Pipa PVC AW 3/4" btg
26 Dop PVC 4" bh
27 SDL PVC 1 1/4" bh
28 SDD PVC 1 1/4" bh
29 Knee PVC 1" bh
30 SDD PVC 3/4" bh
31 Tee PVC 3/4" bh
32 Knee PVC 1" bh
33 Lem Isarplast bh
34 Kran Air 3/4" bh
35 Pompa Submersible Unit
36 Klem Kabel bungkus
37 Sealtape bh
38 Stop Kran PVC 1 1/4" bh
39 Stop Kran PVC 1" bh
40 Stop Kontak bh
41 Kabel MYN 2 x 1.5 mm m
42 Plat Tutup Bok Kontrol set
43 Tower Besi Siku L.40.40 unit
44 Tandon Air Kap. 1 m3 bh
45 Tutup Kap Lampu Jalan bh
46 Lampu Lilin 15 Watt Bergaransi bh
47 Termis 2 A bh
48 Piting Lampu Gantung bh
49 Reng 2/3 m3
50 Pasir Beton m3
47 Papan Cor Bekisting m3
48 Kayu Balok Bekisting m3
49 Keramik Lantai 40x40 Kotak
50 Keramik Lantai 20x20 Kotak
51 Keramik Dinding 20x20 Kotak
52 Cat Tembok Kg
53 Plamir Kg
51 Kawat Beton kg

1/5
Harga Satuan Sesudah Pajak
No Uraian Satuan
(Rp.)

III ALAT
1 Benang roll
2 Selang waterpass m
3 Ember bh
4 Meteran 5 m bh
5 Meteran 50 m bh
6 Sendok Semen bh
7 Gergaji Besi bh
8 Papan Nama Proyek bh
9 Prasasti 40 x 60 cm bh
10 Mob & Demobilisasi Alat Berat ls
11 Sewa Three Wheel Roller 8 T jam
12 Pengki bh
13 Penggaruk bh
14 Perata bh
15 Cangkul bh
16 Palu bh
17 Godam 5 lbs bh
18 Sekop bh
19 Lori bh
20 Tambang 5/8 m
21 Tambang m

2/5
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PROGRAM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT DESA (P3MD)
KECAMATAN ............................. KABUPATEN LAMPUNG UTARA

Harga Satuan Sesudah Pajak


No Uraian Satuan
(Rp.)

I UPAH
1 Pekerja hok 80,000
2 Tukang hok 100,000
3 Tukang Siram Aspal hok 100,000
4 Kepala Tukang hok 100,000
5 Operator hok 100,000
6 Pembantu Operator hok 60,000
7 Mandor hok 100,000

II BAHAN
1 Batu Pecah 3/5 mm m3 295,900
2 Batu Pecah 2/3 mm m3 330,000
3 Batu Pecah 1/2 mm m3 341,000
5 Batu Belah m3 240,000
6 Abu Batu m3 313,500
7 Aspal ESSO drum 2,145,000
8 Batu Split m3 330,000
9 Semen zak 69,000
10 Kayu Bakar m3 102,300
11 Minyak Bakar ltr 11,000
12 Kayu Kelas III (Papan) m3 1,870,000
13 Kayu Kelas II (Balok) m3 2,904,000
14 Plywood tebal 9 mm lbr 145,200
15 Pasir m3 170,000
16 Pasir m3 170,000
17 Paku kg 18,700
18 Besi 12 btg 93,000
18 Besi 10 btg 69,000
19 Besi 8 btg 38,000
20 Besi 6 btg 27,000
22 Bata Merah bh 550
24 Tripleks 3 mm Lbr 55,000
26 List Profil M 49,500
28 Paku Tripleks Kg 38,500
30 Pipa PVC AW 4" btg 11,000
32 Pipa PVC AW 1 1/4" btg 11,000
34 Pipa PVC AW 1" btg 11,000
36 Pipa PVC AW 3/4" btg 8,800
38 Dop PVC 4" bh 6,600
40 SDL PVC 1 1/4" bh 6,600
42 SDD PVC 1 1/4" bh 8,800
44 Knee PVC 1" bh 16,500
46 SDD PVC 3/4" bh 22,000
48 Tee PVC 3/4" bh 3,300,000
50 Knee PVC 1" bh 8,800
52 Lem Isarplast bh 16,500
54 Kran Air 3/4" bh 22,000
56 Pompa Submersible Unit 3,300,000
58 Klem Kabel bungkus 5,500
60 Sealtape bh 3,300
62 Stop Kran PVC 1 1/4" bh 55,000
64 Stop Kran PVC 1" bh 49,500
66 Stop Kontak bh 16,500
68 Kabel MYN 2 x 1.5 mm m 8,000
70 Saklar tunggal bh 25,000
72 Saklar ganda bh 40,000
74 Stop kontak bh 25,000
76 Lampu Lilin 18 W Bergaransi bh 42,350
78 Pipa Listrik 5/8 " Btg 15,000
80 Plat Tutup Bok Kontrol set 110,000
82 Tower Besi Siku L.40.40 unit 4,400,000
84 Tutup Kap Lampu Jalan bh 35,000
86 Lampu Lilin 15 Watt Bergaransi bh 42,350
88 Termis 2 A bh 30,000
90 Piting Lampu Gantung bh 16,500
92 Tandon Air Kap. 1 m3 bh 1,485,000
94 Reng 2/3 m3 2,530,000
96 Pasir Beton m3 170,000
98 Kusen Pintu Plong 350,000
100 Kusen Pintu Doble Plong 900,000
102 Kusen Jendela J1 Plong 350,000
104 Kusen Jendela J2+Kaca Mati 5mm Plong 500,000
3/5
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PROGRAM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT DESA (P3MD)
KECAMATAN ............................. KABUPATEN LAMPUNG UTARA

Harga Satuan Sesudah Pajak


No Uraian Satuan
(Rp.)

106 Daun Pintu Plong 800,000

4/5
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PROGRAM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT DESA (P3MD)
KECAMATAN ............................. KABUPATEN LAMPUNG UTARA

Harga Satuan Sesudah Pajak


No Uraian Satuan
(Rp.)

108 Daun Jendela + Kaca 5 mm J1 Plong 400,000


110 Jendela Almunium Unit 600,000
112 Pintu Doble Almunium Unit 1,000,000
114 Pintu Almunium Unit 800,000
116 Kunci Pintu 2 x putar Bh 200,000
118 Engsel Pintu Bh 15,000
120 Grendel Pintu Tanam Bh 12,000
122 Engsel Jendela Bh 15,000
124 Grendel Jendela Bh 12,000
126 Hak Angin Bh 20,000
128 Bouvenlight Bh 200,000
130 Kloset Jongkok Bh 300,000
132 Ember Besar Kamar Mandi Bh 100,000
134 Pintu PVC Kamar Mandi Bh 400,000
136 Roster Kayu Bh 25,000
138 Papan Cor Bekisting m3 1,800,000
140 Kayu Balok Bekisting m3 1,800,000
142 Keramik Lantai 40x40 Kotak 80,000
144 Keramik Lantai 20x20 Kotak 60,000
146 Keramik Dinding 20x20 Kotak 60,000
148 Cat Tembok Kg 22,000
150 Cat Kayu Kg 45,000
152 Kuas Rol Buah 30,000
154 Kuas 3" Buah 18,000
156 Amplas Kg 8,000
158 Minyak Cat Ltr 5,000
160 Plamir Kg 22,000
162 Kawat Beton kg 22,000
164 Pasang Besi Hollow (Pagar,Pintu) M2 500,000
165 Septicktank Unit 3,000,000
166 Pas. Rangka Baja dan M2 175,000
Atap Genteng Metal Polos
(Bubungan,Lisplank)
167 Pasang Listrik R2 Unit 2,500,000

III ALAT
1 Benang roll 5,000
2 Selang waterpass m 2,500
3 Ember bh 10,000
4 Meteran 5 m bh 11,000
5 Meteran 50 m bh 66,000
6 Sendok Semen bh 27,500
7 Gergaji Besi bh 55,000
8 Papan Nama Proyek bh 150,000
9 Prasasti 40 x 60 cm bh 600,000
10 Mob & Demobilisasi Alat Berat ls 4,400,000
11 Sewa Three Wheel Roller 8 T jam 330,000
12 Pengki bh 33,000
13 Penggaruk bh 33,000
14 Perata bh 33,000
15 Cangkul bh 55,000
16 Palu bh 38,500
17 Godam 5 lbs bh 66,000
18 Sekop bh 55,000
19 Lori bh 450,000
20 Tambang 5/8 m 6,000
21 Tambang m 3,000

KETERANGAN :
HARGA SATUAN BERDASARKAN LOKASI ZONA KAWASAN ( PU )
UNTUK KEBUTUHAN ALAT DISESUAIKAN DENGAN KONDISI KEBUTUHAN