HARGA SATUAN
NO. URAIAN SAT. KETERANGAN
(Rp.)
1 Mandor OH
2 Kepala Tukang OH
3 Tukang OH
4 Tukang Bor OH
5 Pekerja OH
6 Juru Ukur OH
7 Pembantu Juru Ukur OH
8 Supir Jam
9 Operator Pompa OH
10 Operator Alat Berat Jam
11 Operator Cilinder Saw OH
12 Pekerja Alat Berat Jam
13 Mandor Alat Berat Jam
14 Teknisi Sampling Kualitas Air OH
15 Ahli Madya Geologist OH
B. DAFTAR BAHAN/MATERIAL
C. DAFTAR PERALATAN
1 Excavator Jam
2 Excavator + Breaker Jam
3 Dump Truck Jam
4 Bulldozer Jam
5 Vibrator Roller Jam
6 Motor Grader Jam
7 Crane On Track 35 Ton Jam
8 Water Tanker Jam
9 Pile Driver + Hammer Jam
10 Concrete Mixer 0,30 m3 Sewa - Hr
11 Stamper Sewa - Hr
12 Chainsaw Sewa - Hr
13 Waterpass Sewa - Hr
14 Theodolith Sewa - Hr
15 Jack Hammer Sewa - Hr
16 Pompa Lumpur Diesel Sewa - Hr
17 Pompa Sedot Pasir Sewa - Hr
18 Pompa Beton Sewa - Hr
19 Mesin Potong Rumput Sewa - Hr
20 Pompa dan Conveyor Beton Sewa - Hr
21 Genset 1500 Watt Sewa - Hr
22 Pompa Submersible 3 m3/h Sewa - Hr
23 Alat Bantu Contrek Ls
24 Roll Meter Buah
25 Palu/Godam Buah
26 Pahat Beton Buah
27 Linggis Buah
28 Gergaji Besi Buah
29 Gergaji Pipa Sewa - Hr
30 Cilinder Saw Sewa - Hr
31 Pompa Air Diesel 5 Kw Sewa - Jam
32 Pompa Air Diesel 10 Kw Sewa - Jam
33 Pompa Air Diesel 20 Kw Sewa - Jam
34 Bore Hole Dia. 8 3/4" m'
35 Reaming Dia. 8 3/4" - 12" m'
36 Reaming Dia. 8 3/4" - 14 3/4" m'
37 Temporary Cassing (ID) 12" m'
38 Temporary Cassing (ID) 17" m'
39 Drilling Rig + Perlengkapan m'
40 Drilling Rig + Perlengkapan Jam
41 Geo Listrik Sewa - Jam
42 Tripod Sewa - Hr
43 Pemotong Besi Sewa - Hr