HARGA SATUAN
NO. URAIAN SAT. KET'
(Rp.)
1 Mandor OH
2 Kepala Tukang OH
3 Tukang OH
4 Pekerja OH 112.692,31
5 Operator Jam
6 Pembantu Operator Jam
7 Pekerja Alat Berat Jam
8 Mandor Alat Berat Jam
B DAFTAR BAHAN/MATERIAL
1 Batu Kali/Gunung m3
2 Besi Beton Polos Kg
3 Ijuk Kg
4 Kawat Ikat Kg
5 Kaso Uk. 5/7 Cm Btg
6 Kayu Kelas II m3
7 Paku Kayu Kg
8 Kerikil m3
9 Kerikil @ kg m3 1.300,00
10 Pasir Pasang m3
11 Pasir Beton m3
12 Pasir Beton @ kg Kg 1.350,00
13 Pasir Urug m3
14 Solar (Non Subsidi) Ltr
15 Minyak Pelumas/Oli Ltr
16 Multipleks 12 mm Lbr
17 Pipa PVC Dia. 3/4" @ 6,0 m' Btg
18 Pipa PVC Dia. 1,0" @ 6,0 m' Btg
19 Pipa PVC Dia. 1,5" @ 6,0 m' Btg
20 Pipa PVC Dia. 2" @ 6,0 m' Btg
21 Pipa Galvanis Dia. 3,0" tebal 3 mm Btg
22 Semen @ 40 Kg Zak
23 Semen @ 1 Kg Kg
24 Air Ltr
25 Minyak Bekisting Liter
26 Tanah Timbun m3
27 Cerucuk Bambu ∅ 8 -10 cm btg
28 Wiremess M10 (2.1 x 5.4) Lbr
29 Wiremess M10 (2.1 x 5.4) Lbr
C DAFTAR PERALATAN
1 Excavator Jam
2 Concrete Mixer 0,30 m3 Sewa - Hr
3 Concrete Mixer 0,35 m3 Sewa - Hr
4 Palu/Godam Buah
5 Pahat Beton Buah
6 Linggis Buah