Anda di halaman 1dari 100

DAFTAR UPAH PEKERJA

SUMBER DATA : PASARAN BEBAS


D A E R A H : KABUPATEN KEBUMEN

HARGA
NO. J E N I S B A H A N SATUAN KET.
(Rp)
1 Pekerja Hr 68,000
2 Mandor Hr 84,000
3 Tukang listrik Hr 74,000
4 Tukang kayu Hr 74,000
5 Kep. tk. kayu Hr 80,000
6 Tukang batu Hr 74,000
7 Kep. tk. batu Hr 80,000
8 Tukang besi Hr 74,000
9 Kep. tk. besi Hr 80,000
10 T u k a n g c a t Hr 74,000
11 K e p . t k . c a t Hr 80,000
12 T u k a n g p l i t u r Hr 74,000
13 T u k a n g j a l a n Hr 68,000
14 T u k a n g g a l i Hr 68,000
15 Tukang masak aspal Hr 68,000
16 T k . l e i d e n g Hr 74,000
17 M a s i n i s / Operator Hr 74,000
18 P e m b . M a s i n i s Hr 68,000
19 P e n j a g a a p i Hr 68,000
20 P e n j a g a m a l a m Hr 68,000
21 Sopir Hr 74,000
22 Pembantu Sopir Hr 68,000
23 Juru Ukur Hr 74,000
24 Pembantu Juru Ukur Hr 68,000
25 Operator Alat Berat Hr 220,000

Tim Survey

1 Muhamad Arifin, S.Si, MT 1

2 Ir. Dradjat Nugroho Edi 2

3 Eko Prayitno, ST 3
4 Teguh Achmad Sumarsono, ST 4
5 Iksanudin, S.ST, MT
5
6 Bachtiar Achmad, ST, Mec, Dev 6

7 Agus Muslim, ST 7
8 Suparno 8

Kebumen,

KEPALA DINAS PEKERJAAN UMUM


DAN PENATAAN RUANG
KABUPATEN KEBUMEN

H. SLAMET MUSTOLKHAH, ST, MT


NIP. 19690922 199703 1 005
DAFTAR HARGA SATUAN BAHAN BANGUNAN

SUMBER DATA : PASARAN BEBAS


D A E R A H : KABUPATEN KEBUMEN

HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 210,000
Bulat Belah m3 210,000
Pecah 10/15 m3 225,000
Pecah 5/7 m3 250,000
Pecah 3/5 m3 300,000
2 KERIKIL Timbun/Sirtu m3 180,000
Sawur / Koral m3 180,000
Beton 0,5/1 m3 270,000
Beton ,1/2 m3 310,000
Beton ,2/3 m3 325,000
Biasa m3 210,000
Tras Giling m3 160,000
3 BATU BATA ex lokal bh 800

4 PASIR Urug m3 150,000


Pasang m3 250,000
Beton m3 330,000
5 TANAH Cadas m3 100,000
Liat m3 100,000
6 KAPUR Padam m3 230,000
Pasang m3 310,000
Semen Merah m3 124,000
7 PORTLAND CEMENT

Merk I 40 kg zak 45,600


Merk I 50 kg zak 57,000
Merk II 40 kg zak 45,600
Merk II 50 kg zak 57,000
Semen Putih 40 kg zak 90,000
Semen Putih 50 kg zak 112,500
Semen warna kg 11,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

II BAHAN PENUTUP ATAP

1 SIRAP (100 lbr) pak 477,000

2 GENTENG BETON Genteng Beton Warna standard bh 5,500


Genteng Beton Warna Special bh 6,000
Genteng Beton Warna Khusus bh 6,500
Kerpus Beton Warna Standard bh 5,500
Kerpus Beton Warna Special bh 10,000
Kerpus Beton Warna Khusus bh 11,000
3 GENTENG TANAH LIAT

Vlaam bh 1,800
Kodok bh 2,000
Kodok Glasur bh 3,500
Nok kerpus Kodok bh 3,500
Nok kerpus Kodok Glasur bh 6,000
Plentong super besar 18 bh/m2 bh 2,700
Nok kerpus plentong super bh 3,500
Genteng Magase bh 2,000
Genteng Magaze glazur bh 4,800
Genteng Morando biasa bh 2,700
Genteng Morando glazur bh 5,600
4 ASBES GELOMBANG BESAR

. 200 cm X 102 cm X 5 mm bh 75,000


. 225 cm X 102 cm X 5 mm bh 85,000
. 250 cm X 102 cm X 5 mm bh 95,000
. 200 cm X 102 cm X 6 mm bh 85,000
. 225 cm X 102 cm X 6 mm bh 87,000
. 250 cm X 102 cm X 6 mm bh 90,000
Asbes Gelombang Kecil

. 150 cm X 105 cm X 4 mm bh 45,000


. 180 cm X 105 cm X 4 mm bh 47,000
. 210 cm X 105 cm X 4 mm bh 52,000
. 240 cm X 105 cm X 4 mm bh 55,000
. 270 cm X 105 cm X 4 mm bh 66,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

. 300 cm X 105 cm X 4 mm bh 76,000


HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

5 NOK Jabes nok

. Kerpus Genteng bh 28,000


. Stel Besar bh 28,000
. Paten Besar bh 41,000
Nokstel gelombang harflex

. Stel Besar bh 42,000


. Patent Besar bh 44,000
. Plat besar bh 48,000
6 ASBES PLAT

. 100cm X 100 cm X 3 mm bh 14,500


. 100cm X 100 cm X 4 mm bh 15,000
. 50 cm X 200 cm X 3 mm bh 13,000
. 40 cm X 200 cm X 3 mm bh 12,000
7 FIBRE GLASS (JABES)

180 X 92 cm bh 47,500
200 X 92 cm bh 57,250
250 X 92 cm bh 66,000
180 X 105 cm bh 66,500
210 X 105 cm bh 66,800
250 X 105 cm bh 75,000
8 SENG PLAT

BJLS 0,18 lebar 55 cm m' 19,000


BJLS 0,20 lebar 55 cm m' 20,000
BJLS 0,28 lebar 55 cm m' 26,000
BJLS 0,30 lebar 55 cm m' 29,500
9 SENG GELOMBANG

BJLS 0,18 panjang 180 cm lbr 52,000


BJLS 0,20 panjang 180 cm lbr 57,000
BJLS 0,30 panjang 180 cm lbr 81,000
BJLS 0,40 panjang 180 cm lbr 85,000
III . B A H A N K A Y U
1 JATI Papan m3 15,750,000
Balok/pesagen m3 15,500,000

2 KAMPER Papan m3 11,000,000


HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

Balok/pesagen m3 9,500,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

3 KRUING Papan m3 10,000,000


Balok/pesagen m3 8,000,000

4 MERANTI Papan m3 5,450,000


Balok/pesagen m3 5,450,000

5 TAHUN Papan m3 2,400,000


Balok/pesagen m3 2,400,000

6 BENGKIRAI Papan m3 15,500,000


Balok/pesagen m3 11,500,000

7 DOLKEN Sedang 8 x 10 x 400 cm bt 8,500


Kecil 6 x 7 x 400 cm bt 8,300
Besar 10 x 12 x 400 cm bt 11,450
Kayu cetakan m3 2,400,000
Kayu begisting m3 2,400,000
Kayu bakar m3 167,000
Bambu bt 13,250
IV . BAHAN PENUTUP DINDING / LANTAI
1 UBIN (TEGEL BIASA)

PC polos 30 X 30 cm m2 55,000
20 X 20 cm m2 60,000
PC warna 30 X 30 cm m2 65,000
20 X 20 cm m2 63,000
Teraso 30 X 30 cm m2 70,000
2 UBIN PORSELIN

Lokal 11 X 11 putih dos 65,000


11 X 11 warna dos 70,000
Lokal 15 X 15 putih dos 70,000
15 X 15 warna dos 74,000
3 MOZAIK PORSELIN

10 X 20 cm m2 75,000
15 X 15 cm m2 80,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

20 X 20 cm m2 83,000
20 X 25 cm m2 85,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

4 Keramik 30 X 30 cm m2 60,000
20 X 20 cm m2 70,000
33 x 33 cm m2 85,000
40 x 40 cm m2 100,000
25 x 25 cm m2 83,000
15 x 20 cm m2 80,000

V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh 75,000
Ø 20 cm - 100 cm bh 80,000
Ø 30 cm - 100 cm bh 85,000
Ø 50 cm - 100 cm bh 132,000
Ø 60 cm - 100 cm bh 220,000
Ø 70 cm - 100 cm bh 285,000
U 10 cm - 100 cm bh 50,000
U 15 cm - 100 cm bh 70,000
U 20 cm - 100 cm bh 85,000
U 30 cm - 100 cm bh 105,000
U 50 cm - 100 cm bh 135,000

2 U DITCH DAN BOX CULVERT


uditch uk. 30 x 30 x 120 tbl 5 cm unit 390,000
Uditch uk. 30 x 40 x 120 tbl 5 cm unit 450,000
uditch uk. 30 x 50 x 1"20 tbl 5 cm unit 510,000
Cover LC uk. 40 x L20 cm tbl l-0 cm unit 260,000
Cover HD uk. 40x1-20 cm tbl L5 cm unit 350,000
uditch uk. 40 x 40 x 120 tbl 5 cm unit 480,000
uditch uk. 40 x 50 x 1-20 tbl 5 cm unit 540,000
Uditch uk. 40 x 60 x 120 tbl 5 cm unit 600,000
Cover LC uk. 50 x 120 cm tbl 10 cm unit 280,000
Cover HD uk. 50 x 120 cm tbl 15 cm unit 390,000
uditch Uk. 50 x 50 x 120 tbl 7 cm unit 720,000
Uditch uk. 50 x 60 x 120 tbl 7 cm unit 800,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

uditch Uk. 50 x 70 x 120 tbl 7 cm unit 880,000


Cover LC uk. 64x120 cm tbl 10 cm unit 340,000
Cover HD uk. 64 x 120 cm tbl 15 cm unit 480,000
uditch uk. 60 x 60 x 120 tbl 7 cm unit 830,000
uditch uk. 60 x 70 x 120 tbl 7 cm unit 910,000
uditch uk. 60 x 80 x 120 tbl 7 cm unit 990,000
uditch uk. 60 x 100 x 120 tbl 7 cm unit 1,270,000
Cover LC uk. 74x120 cm tbl 10 cm unit 380,000
Cover HD uk.74x120 cm tbl 15 cm unit 550,000
uditch uk. 80 x 80 x 120 tbl 8 cm unit 1,260,000
Cover LC uk. 96x120 tbl 10 cm unit 550,000
Cover HD uk. 96x120 tbl 15 cm unit 740,000
uditch uk. 80 x 80 x 120 tbl 7 cm unit 1,200,000
uditch uk. 80 x 100 x 120 tbl 7 cm unit 1,340,000
Cover LC uk. 94x120 cm tbl 10 cm unit 470,000
Cover HD uk.94x120 cm tbl 15 cm unit 690,000
uditch uk. 80 x 100 x 120 tbl 10 cm unit 1,800,000
Cover LC uk. 100 x 120 tbl 10 cm unit 550,000
Cover HD uk. 100 x 120 tbl 15 cm unit 790,000
uditch uk. 80 x 100 x 120 tbl 15 cm unit 2,450,000
Cover LC uk. 110x120 tbl 10 cm unit 580,000
Cover HD uk. 110 x 120 tbl 15 cm unit 870,000
uditch uk. 100 x 100 x 120 tbl 10 cm unit 1,920,000
Cover LC uk. 120x120 tbl 12 cm unit 700,000
Cover HD uk. 120x120 tbl 15 cm unit 870,000
uditch uk. 120 x120 x 120 tbl 10 cm unit 2,330,000
uditch uk. 120 x 140 x 120 tbl 10 cm unit 2,550,000
Cover LC uk. 140x120 tbl 12 cm unit 810,000
Cover HD uk. 140x120 tbl 15 cm unit 1,000,000
Uditch uk. 200 x 200 x 120 tbl 17 cm unit 5,960,000
Uditch uk. 200 x 200 x 120 tbl 20 cm unit 6,910,000
Box Culvert 40 x 40 x 120 tbl 8 cm unit 950,000
Box Culvert 50 x 50 x 120 tbl 8 cm unit 1,200,000
Box Culvert 50 x 50 x 120 tbl 16 cm unit 2,370,000
Box Culvert 60 x 60 x 120 tbl 8,5 cm unit 1,350,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

Box Culvert 60 x 60 x 120 tbl 16 cm unit 2,650,000


Box Culvert 60 x 80 x 120 tbl 12 cm unit 2,270,000
Box Culvert 80 x 80 x 120 tbl 10 cm unit 2,500,000
Box Culvert 80 x 80 x 120 tbl 15 cm unit 3,350,000
Box Culvert 80 x 80 x 120 tbl 20 cm unit 4,400,000
Box Culvert 100 x 100 x120 tbl 12 cm unit 3,400,000
Box Culvert 100 x 100 x 120 tbl 15 cm unit 4,050,000
Box Culvert 120 x 120 x 120 tbl 14 cm unit 4,750,000
Box Culvert 150 x 150 x 120 tbl 17 cm unit 6,350,000
Box Culvert 200 x 200 x 120 tbl 20 cm unit 10,220,000

VI . B A H A N B E S I
1 BESI BETON besi beton polos kg 12,500
besi beton prestress kg 12,500
besi beton ulir kg 12,500

2 BESI PLAT Besi Strip kg 14,500

3 BESI PROFIL Besi Profil kg 13,000

4 JARING - JARING BAJA

Diameter 4 - 15 kg 12,900
Diameter 6 - 15 kg 12,900
Kawat bronjong Φ 3 mm kg 20,000
Kawat bronjong Φ 4 mm kg 20,000
5 BESI SIKU L 40 X 40 X 4 btg 75,000
L 50 X 50 X 5 btg 105,000
L 60 X 60 X 6 btg 235,000

6 KAWAT - Ikat beton/bendrat kg 19,000


- Harmonika 12 X 45 mm m2 28,000
- Harmonika 12 X 24 mm m2 28,000
- Harmonika 14 X 30 mm m2 28,000
- Harmonika 14 X 35 mm m2 33,000
- Kawat Nyamuk Nylon m2 23,500
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

- Kawat Kasa m2 23,500


- Saringan pasir m2 30,000
- Kawat loket m2 23,500
- Kawat duri rol 80,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)

Pipa PVC DN 20 ( ½" ) AW JIS btg 21,000 panjang 4 m


Pipa PVC DN 25 ( ¾" ) AW JIS btg 27,500 panjang 4 m
Pipa PVC DN 32 ( 1" ) AW JIS btg 52,500 panjang 4 m
Pipa PVC DN 40 ( 1½" ) btg 100,000 panjang 4 m
Pipa PVC DN 63 ( 2" ) btg 150,000 panjang 4 m
Pipa PVC DN 67 ( 2,5" ) btg 180,000 panjang 4 m
Pipa PVC DN 90 ( 3" ) btg 300,000 panjang 4 m
Pipa PVC DN 110 ( 4" ) btg 410,000 panjang 4 m

2 Pipa Medium B Galvanis - SII

Pipa Medium B Galvanis DN ½" btg 95,000 panjang 6 m


Pipa Medium B Galvanis DN 25 ( ¾" ) btg 115,000 panjang 6 m
Pipa Medium B Galvanis DN 32 ( 1" ) btg 152,000 panjang 6 m
Pipa Medium B Galvanis DN 50 ( 1½" ) btg 215,000 panjang 6 m
Pipa Medium B Galvanis DN 63 ( 2" ) btg 270,000 panjang 6 m
Pipa Medium B Galvanis DN 2½" btg 305,000 panjang 6 m
Pipa Medium B Galvanis DN 90 ( 3" ) btg 475,000 panjang 6 m
Pipa Medium B Galvanis DN 110 ( 4" ) btg 750,000 panjang 6 m
Pipa Medium B Galvanis DN 160 ( 6" ) btg 1,900,000 panjang 6 m
Pipa Medium B Galvanis DN 200 ( 8" ) btg 3,900,000 panjang 6 m

3 Pipa PVC AW

Pipa PVC dia 1/2" btg 21,000 panjang 4 m


Pipa PVC dia 3/4" btg 35,000 panjang 4 m
Pipa PVC dia 1" btg 38,000 panjang 4 m
Pipa PVC DN 40 ( 1½" ) btg 65,000 panjang 4 m
Pipa PVC DN 63 ( 2" ) btg 84,000 panjang 4 m
Pipa PVC DN 67 ( 2,5" ) btg 120,000 panjang 4 m
Pipa PVC DN 90 ( 3" ) btg 170,000 panjang 4 m
Pipa PVC DN 110 ( 4" ) btg 275,000 panjang 4 m
Pipa PVC DN 160 ( 6" ) btg 590,000 panjang 4 m
Pipa PVC DN 200 ( 8" ) btg 950,000 panjang 4 m
Pipa PVC DN 250 ( 10" ) btg 1,500,000 panjang 4 m
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

Pipa PVC DN 315 ( 12" ) btg 2,100,000 panjang 4 m

4 Pipa HDPE

pipa HDPE Ø 63 mm m' 39,000


pipa HDPE Ø 100 mm m' 80,000
pipa HDPE Ø 125 mm m' 131,000
pipa HDPE Ø 150 mm m' 250,000
pipa HDPE Ø 200 mm m' 390,000
pipa HDPE Ø 250 mm m' 615,000
pipa HDPE Ø 300 mm m' 980,000
pipa HDPE Ø 400 mm m' 1,500,000
pipa HDPE Ø 450 mm m' 2,000,000
pipa HDPE Ø 500 mm m' 2,450,000
pipa HDPE Ø 600 mm m' 3,850,000
pipa HDPE Ø 800 mm m' 6,150,000

VIII . B A H A N L A N G I T - L A N G I T
1 PLY WOOD

Teak wood

90 X 210 X 3 mm lbr 73,000


. 120 X 240 X 3 mm lbr 85,000
. 90 X 210 X 4 mm lbr 85,000
. 90 X 210 X 9 mm lbr 120,000
- . 90 X 210 X 12 mm lbr 150,000
- . 90 X 210 X 15 mm lbr 190,000
. 90 X 210 X 18 mm lbr 250,000
2 Tripleks

. 120 X 240 X 3 mm lbr 62,000


. 120 X 240 X 4 mm lbr 70,000
. 120 X 240 X 6 mm lbr 80,000
3 Multipleks

. 120 X 240 X 9 mm lbr 109,000


. 120 X 240 X 12 mm lbr 140,000
. 120 X 240 X 15 mm lbr 190,000
. 120 X 240 X 18 mm lbr 210,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

4 Formika ukuran pintu lbr 64,000


IX . B A H A N F I N I S H I N G
1 KAYU

Menie kg 28,000
Dempul plamur kg 30,000
Ambril/amplas lbr 3,000
Batu Apung kg 27,500
Cat dasar kg 52,500
. Emco kg 50,000
. Yunior 66 (nippon paint) kg 52,500
. Kuas bh 9,500
. Deculux kg 52,500
. Siralax ons 9,500
. Spiritus ltr 14,250
. Plitur jadi ltr 54,500

2 TEMBOK

Kalkarium kg 5,700
Kapur sirih kg 2,900
Plamur kg 28,500
Cat Tembok kg 23,500
Sintex 5 kg 21,000
Danabride 5 kg 21,000
Catylac 5 kg 32,000
Mowilex 2,5 kg 38,000

3 BESI

Menie kg 38,000
Cat mengkilat kg 57,000
Cat kg 57,000
Thinner A ltr 21,000
Minyak cat ltr 23,500
Thinner Super ltr 28,500
Residu (teer/aspal) drum 14,500
Fibre glass (tanki air)
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

kapasitas 550 liter. bh 1,000,000


kapasitas 1100 liter. bh 1,650,000
Lem Aica Aibon kg 23,500
X.BAHAN KACA
1 POLOS 3 mm m2 66,500
5 mm m2 90,500

2 ES KABUR 3 mm m2 71,500
5 mm m2 89,000

3 RAY BAND 3 mm m2 66,500


5 mm m2 90,500
XI . ALAT PENGIKAT KAYU
1 PAKU - ukuran 1" s/d 4" kg 13,300
2 PAKU - payung kg 35,000
3 PAKU - sekrup doos 44,500
4 PAKU - beton bh 76,000
5 MUR BAUT (kuda-kuda) kg 23,500
6 ANGKUR BAUT bh 19,000
7 LEM KAYU bh 25,000
8 Tali Ijuk kg 9,500

XII . POMPA AIR.


1 POMPA AIR TANGAN

Dragon buatan Indonesia bh 475,000


2 POMPA AIR LISTRIK

Sanyo 100 watt bh 450,000


Fuji 250 watt bh 800,000
Shimizu . 100 watt bh 425,000
. 90 watt bh 350,000
Dab . 125 watt bh 350,000
. 175 watt bh 425,000
XIII. L A I N - L A I N
1 KREI 25 MM m2 43,000
2 Sliding Pintu J4 bh 180,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

3 Naco per Daun bh 170,000


4 Rolling door Besi m2 380,000
Rolling door Almunium m2 390,000
5 Awning Almunium m2 200,000
6 Kusen Almunium 4" Putih m' 80,000
7 WIDE FLANGE BEAM

150 X 75 X 5 X 7 X 12 btg 1,050,000

10 K A C A

Cermin 5 mm m2 140,000

11 PAGAR BRC. Pagar BRC 90 A2 /lb 310,000


Pagar BRC 120 A2 /lb 375,000
12 LAIN-LAIN

Minyak Beton & bekisting ltr 20,000


Pintu Lipat Besi m2 348,000
Sunscreen Allumunim m2 90,000
Allumunium Foil m2 11,500
Soda api kg 19,000
Sabun kg 28,500
Air m3 4,500
Solar (Industri) ltr 9,900
Premium (Industri) ltr 10,400
Pelumas ltr 28,500
Pintu Angkat Baja b = 0.20, h = 0.20 Bh 3,300,000
Pintu Angkat Baja b = 0.25, h = 0.25 Bh 3,630,000
Pintu Angkat Baja b = 0.30, h = 0.30 Bh 3,850,000
Pintu Angkat Baja b = 0.35, h = 0.35 Bh 4,180,000
Pintu Angkat Baja b = 0.40, h = 0.40 Bh 4,950,000
Pintu Angkat Baja b = 0.45, h = 0.45 Bh 5,500,000
Pintu Angkat Baja b = 0.50, h = 0.50 Bh 6,050,000
Pintu Sorong/Geser Baja b = 0.30 h = 0.30 Bh 6,600,000
Pintu Sorong/Geser Baja b = 0.35 h = 0.35 Bh 7,700,000
Pintu Sorong/Geser Baja b = 0.40 h = 0.40 Bh 9,900,000
Pintu Sorong/Geser Baja b = 0.40 h = 0.50 Bh 10,450,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

Pintu Sorong/Geser Baja b = 0.50 h = 0.50 Bh 11,000,000


Pintu Sorong/Geser Baja b = 0.55 h = 0.55 Bh 11,770,000
Pintu Sorong/Geser Baja b = 0.60 h = 0.60 Bh 12,650,000
Pintu Sorong/Geser Baja b = 0.65 h = 0.65 Bh 14,300,000
Pintu Sorong/Geser Baja b = 0.70 h = 0.70 Bh 16,500,000
Pintu Sorong/Geser Baja b = 0.75 h = 0.75 Bh 17,600,000
Pintu Sorong/Geser Baja b = 0.80 h = 0.70 Bh 18,700,000
Pintu Sorong/Geser Baja b = 0.90 h = 1.00 Bh 19,800,000
Pintu Sorong/Geser Baja b = 1.00 h = 1.00 Bh 22,000,000
Pintu Sorong/Geser Baja b = 1.00 h = 1.20 Bh 24,200,000
Pintu Sorong/Geser Baja b = 1.20 h = 1.20 Bh 26,400,000
Pintu Sorong/Geser Kayu b = 1.30 h = 1.10 Bh 28,600,000
Pintu Sorong/Geser Kayu b = 1.30 h = 1.35 Bh 29,700,000
Pintu Sorong/Geser Kayu b = 1.50 h = 1.50 Bh 33,000,000
Pintu Katrol b =2.50 h =2.00 Bh 80,000,000
Pintu Katrol b =2.50 h =2.25 Bh 85,000,000
Pintu Katrol b =2.50 h =2.50 Bh 95,000,000
Pintu Katrol b =2.50 h =2.75 Bh 95,000,000
Pintu Katrol b =3.75 h =2.00 Bh 95,000,000
Gembolo Kuningan Bh 7,500,000
Pintu Klep Fiber Resin(1.00 x1.00) m Bh 19,950,000
Katrol 3 Ton Bh 2,850,000
Katrol 4 Ton Bh 3,300,000
Katrol 5 Ton Bh 4,250,000
Katrol 10 Ton Bh 8,000,000
Kawat Las kg 28,000
Kawat Bronjong Pabrikasi dia,2.7 mm Uk. ( 2.00 x 1.00x
0.50 )m
Unit 350,000

Kawat Bronjong Pabrikasi dia,3,0 mm Uk. ( 3.00 x 1.00x 0.50 )


m
Unit 400,000

Cangkul Bh 124,000
Sabit Bh 70,000
Cakar (tanpa gagang) Bh 85,000
Karung plastik Lbr 6,900
Mesin Potong Rumput Gendong (Honda ) Bh 4,000,000
Seal tape Bh 7,500
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

Palu Godam Bh 85,000


Geotextile non woven M2 12,900
Geomembran HDPE HDS 150 (1,5 mm) terpsg M2 95,000
V Noth Buah 500,000
Mistar Ukur P = 0,5 m bh 235,000
Mistar Ukur P = 4 m bh 1,900,000
Klem Besi Galvanis bh 143,000
Kran Pengambilan PVC ø 4 " bh 118,000
Paving Block segi 4, t = 8 cm m2 70,000
Engsel Pintu terpasang bh 16,250
Pegangan Pintu terpasang bh 114,500
Papan Nama Embung Unit 1,425,000
Papan Peringatan Embung Unit 475,000
Tangga Tali bh 190,000
Pelampung + Tali bh 285,000
Minyak Tanah liter 12,870
Gebalan Rumput m2 15,450

Kansteen Uk. 50 x 15 x 30 x 12 bh 15,000

XIV PERALATAN

1 Excavator 80-140 Hp. Jam 300,000


2 Compressor 4000 - 6500 L/M Jam 162,500
3 Chainsaw Hari 30,000
4 Jack Hammer Jam 18,000
5 Molen (0,3 - 0,6 m3) Jam 10,500
6 Waterpass Hari 90,800
7 Theodolit Hari 136,000
8 Stamper Hari 130,000
9 Alat Potong rumput Hari 80,000
10 Dump Truck Hari 290,000
11 Bulldozer Jam 350,000
12 Water Tanker Truck 3000 - 4500 L Hari 125,000
13 Vibro Roller 5-8 Ton Hari 250,000
14 Tripod Tinggi 5 m' Hari 150,000
15 Alat Pancang Hammer 0,5 ton Hari 100,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

16 Alat Penyambung Tiang Pancang Dolken Hari 50,000


17 Palu Godam Hari 5,000
18 Pahat Beton Hari 5,000
19 Pompa dan Conveyor Beton Hari 450,000
20 Vibrator Hari 150,000
21 Jack Tension / stressing Hari 600,000
22 Tripod tinggi 5 m' Hari 150,000
23 Hammer 1 - 2 ton (manual) Hari 150,000
24 Alat Penyambung Tiang Pancang Hari 50,000
25 Alat Las Hari 65,000
26 Bor Listrik Hari 10,000
HARGA
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)

27 Linggis Hari 5,000


28 Crane 2 ton Hari 90,000
29 Alat Bantu Set 122,000

Tim Survey

1 Muhamad Arifin, S.Si, MT 1

2 Ir. Dradjat Nugroho Edi 2

3 Eko Prayitno, ST 3

4 Teguh Achmad Sumarsono, ST 4

5 Iksanudin, S.ST, MT 5

6 Bachtiar Achmad, ST, Mec, Dev 6

7 Agus Muslim, ST 7

8 Suparno 8

Kebumen,

KEPALA DINAS PEKERJAAN UMUM


DAN PENATAAN RUANG
KABUPATEN KEBUMEN

H. SLAMET MUSTOLKHAH, ST, MT


NIP. 19690922 199703 1 005
HARGA SATUAN PEKERJAAN KONSTRUKSI

SUMBER DATA : PASARAN BEBAS


D A E R A H : KABUPATEN KEBUMEN

JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp
I A.1 HARGA SATUAN PEKERJAAN TANAH
A.1.1 PEKERJAAN TANAH SECARA MANUAL

a AHSP PEMBERSIHAN & PENGUPASAN PERMUKAAN TANAH

1 T.01.a m2 PEMBERSIHAN DAN STRIPING / KOSREKAN 5,042.40

2 T.01.b m2 TEBAS TEBANG BERUPA MEMOTONG & MEMBERSIHAKAN 6,444.57

LOKASI DARI TANAMAN / TUMBUHAN Ø < 15 CM

3 T.01.c bh CABUT TUNGGUL POHON TANAMAN KERAS Ø > 15 CM & 20,108.00

MEMBUANG SISA TUNGGUL KAYU & AKAR-AKARNYA

b AHSP UITZET TRASE SALURAN DAN PASANG PROFIL MELINTANG

4 T.02.a m' UITZET TRASE SALURAN 2,520.32

5 T.02.b.1 m' PASANG PROFIL MELINTANG GALIAN TANAH 25,181.42

c AHSP PEKERJAAN TANAH CARA MANUAL

T.06 GALIAN TANAH BIASA

6 T.06.a m3 GALIAN TANAH BIASA sedalam < 1 m 47,314.52

7 T.06.a.2 m3 GALIAN TANAH BIASA sedalam s/d 2 m 56,727.00

8 T.06.a.3 m3 GALIAN TANAH BIASA sedalam s/d 3 m 63,870.40

9 T.06.a.4 m3 GALIAN TANAH BIASA dg kedalaman > 3 m, 6,303.00

TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m

T.07 GALIAN TANAH BERBATU

10 T.07.a.1 m3 GALIAN TANAH BERBATU sedalam < 1 m 113,538.04

11 T.07.a.2 m3 GALIAN TANAH BERBATU sedalam s/d 2 m 113,586.00

12 T.07.a.3 m3 GALIAN TANAH BERBATU sedalam s/d 3 m 138,666.00

13 T.07.a.4 m3 GALIAN TANAH BERBATU dg kedalaman > 3 m, 11,765.60

TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m

T.08 GALIAN BATU

14 T.08.a.1 m3 GALIAN BATU sedalam < 1 m 283,887.12

15 T.08.a.2 m3 GALIAN BATU sedalam s/d 2 m 315,150.00

16 T.08.a.3 m3 GALIAN BATU sedalam s/d 3 m 346,711.20

17 T.08.a.4 m3 GALIAN BATU dg kedalaman > 3 m, 31,515.00

TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m

T.09 GALIAN TANAH CADAS ATAU TANAH KERAS

18 T.09.a.1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam ≤ 1 m 105,050.00

19 T.09.a.2 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam s/d 2 m 116,983.68

20 T.09.a.3 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam s/d 3 m 126,060.00

21 T.09.a.4 m3 GALIAN TANAH CADAS ATAU TANAH KERAS dg kedalaman > 3 m, 8,404.00

TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m


JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp
T.10 GALIAN LUMPUR

22 T.10.a.1 m3 GALIAN LUMPUR sedalam ≤ 1 m 69,753.20

23 T.10.a.2 m3 GALIAN LUMPUR sedalam s/d 2 m 84,040.00

24 T.10.a.3 m3 GALIAN LUMPUR sedalam s/d 3 m 96,646.00

25 T.10.a.4 m3 GALIAN LUMPUR dg kedalaman > 3 m, 12,606.00

TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m

T.11 GALIAN PASIR UNTUK FONDASI BANGUNAN

26 T.11.a.1 m3 GALIAN PASIR UNT FONDASI BANGUNAN sedalam ≤ 1 m 55,466.40

27 T.11.a.2 m3 GALIAN PASIR UNT FONDASI BANGUNAN sedalam s/d 2 m 67,232.00

28 T.11.a.3 m3 GALIAN PASIR UNT FONDASI BANGUNAN sedalam s/d 3 m 77,316.80

29 T.11.a.4 m3 GALIAN PASIR UNT FONDASI BANGUNAN dg kedalaman > 3 m, 1,306.80

TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m

d AHSP PEKERJAAN TANAH menggunakan alat

T.07.b GALIAN TANAH BERBATU

30 T.07.b.1 m3 GALIAN TANAH BERBATU sedalam < 1 m 38,612.20

31 T.07.b.2 m3 GALIAN TANAH BERBATU sedalam s/d 2 m 44,495.00

32 T.07.b.3 m3 GALIAN TANAH BERBATU sedalam s/d 3 m 48,697.00

33 T.07.b.4 m3 GALIAN TANAH BERBATU dg kedalaman > 3 m, 15,921.40

TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m

T.08 GALIAN BATU

34 T.08.b.1 m3 GALIAN BATU sedalam < 1 m 88,990.00

35 T.08.b.2 m3 GALIAN BATU sedalam s/d 2 m 105,798.00

36 T.08.b.3 m3 GALIAN BATU sedalam s/d 3 m 115,882.80

37 T.08.b.4 m3 GALIAN BATU dg kedalaman > 3 m, 36,465.00

TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m

T.09 GALIAN TANAH CADAS ATAU TANAH KERAS

38 T.09.b.1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam ≤ 1 m 29,367.80

39 T.09.b.2 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam s/d 2 m 37,771.80

40 T.09.b.3 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam s/d 3 m 44,495.00

41 T.09.d m3 GALIAN TANAH CADAS ATAU TANAH KERAS dg kedalaman > 3 m, 10,879.00

TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m

42 T.12.a m' PERKUATAN DINDING GALIAN UNT 1 m' PALING BAWAH 1,431,720.40

contoh MENGGUNAKAN BAJA INP-10 & BALOK KAYU 8/12

43 T.12.b m' PENAMBAHAN TINGGI PERKUATAN DINDING GALIAN 1,282,604.40

contoh MENGGUNAKAN BAJA INP-10 & BALOK KAYU

44 T.12.c m' PERKUATAN DINDING GALIAN DG TURAP PALING BAWAH 396,110.00

contoh MENGGUNAKAN TURAP BAJA INP-8

45 T.12.d m' PERKUATAN DINDING GALIAN DG TURAP UNTUK PENAMBAHAN TINGGI 287,298.00

contoh MENGGUNAKAN TURAP BAJA INP-8


JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp
T.14 TIMBUNAN DAN PEMADATAN

46 T.14.a m3 TIMBUNAN TANAH ATAU URUGAN TANAH KEMBALI 27,733.20

47 T.14.b.1 m3 PEMADATAN TANAH 49,170.00

48 T.14.c.1 m3 TIMBUNAN PASIR SEBAGAI BAHAN PENGISI 363,616.00

49 T.14.d m3 PEMADATAN PASIR SEBAGAI BAHAN PENGISI 20,640.00

T.15 ANGKUTAN MATERIAL DAN ATAU GALIAN

T.15.a. SECARA MANUAL

50 T.15.a.1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT > 3m S/D < 5 m 19,696.16

51 T.15.a.1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 5 m 19,696.16

52 T.15.a.2 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 10 m 21,602.24

53 T.15.a.4 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 30 m 28,273.52

54 T.15.a.5 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 50 m 33,515.24

55 T.15.a.6 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 100 m 47,652.00

56 T.15.a.7 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 200 m 75,449.00

57 T.15.a.8 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 300 m 103,246.00

58 T.15.a.9 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 400 m 131,043.00

59 T.15.a.10 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 500 m 154,869.00

60 T.15.a.11 m3 MENGANGKUT HASIL GALIAN DG 27,955.84

JARAK ANGKUT > 500 m SETIAP PENAMBAHAN 100 m

A.2 PEKERJAAN PASANGAN

P.01 PASANGAN BATU DENGAN MORTAR JENIS PC - PP

61 P.01.a.2 m3 MORTAR TIPE M 944,884.60

(Mutu PP tertentu setara dg campuran 1PP : 2PP)

62 P.01.b.2 m3 MORTAR TIPE S 894,559.60

(Mutu PP tertentu setara dg campuran 1PP : 3PP)

63 P.01.c.2 m3 MORTAR TIPE N 855,278.60

(Mutu PP tertentu setara dg campuran 1PP : 4PP)

64 P.01.d.2 m3 MORTAR TIPE O 829,516.60

(Mutu PP tertentu setara dg campuran 1PP : 5PP)

65 P.01.e.1 m3 BONGKAR PASANGAN BATU & PEMBERSIHAN BATU (MANUAL) 143,440.00

66 P.01.e.2 m3 BONGKAR PASANGAN BATU (MANUAL) 100,881.00

67 P.01.e.3 m3 BONGKAR PASANGAN BATU dengan JACK HAMMER 51,414.00

68 P.01.e.4 m3 PEMBERSIHAN BONGKARAN PASANGAN BATU 16,841.00

A.2 PEKERJAAN PASANGAN 5,586.00

P.02 PASANGAN BATA MERAH

69 P.02.b.1 m3 MORTAR TIPE S 1,020,899.00

(Mutu PP tertentu setara dg campuran 1PP : 3PP)

70 P.02.c.2 m3 MORTAR TIPE N 974,677.00

(Mutu PP tertentu setara dg campuran 1PP : 4PP)

71 P.02.d.1 m3 MORTAR TIPE O 963,732.00

(Mutu PP tertentu setara dg campuran 1PP : 5PP)

72 P.02.e.1 m3 MORTAR campuran 1PP : 6PP 968,176.00


JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp
73 P.02.f.1 m3 BONGKAR PASANGAN BATA MERAH (MANUAL) 50,435.00

74 P.02.f.2 m3 BONGKAR PASANGAN BATA MERAH dengan JACK HAMMER 17,204.00

P.03 PEKERJAAN SIARAN DG MORTAR JENIS PC-PP

75 P.03.a m2 SIARAN DG MORTAR JENIS PC-PP TYPE M 49,992.36

(campuran 1PC : 2PP)

76 P.03.b m2 SIARAN DG MORTAR JENIS PC-PP TYPE S 49,761.36

(campuran 1PC : 3PP)

P.04 PEKERJAAN PLESTERAN DG MORTAR JENIS PC-PP

77 P.04.a m2 TRASRAAM TEBAL 1 cm, 51,670.96

DG MORTAR JENIS PC-PP TYPE M (campuran 1PC : 2PP)

78 P.04.b m2 PLESTERAN TEBAL 1 cm, 50,465.36

DG MORTAR JENIS PC-PP TYPE S (campuran 1PC : 3PP)

79 P.04.c m2 PLESTERAN TEBAL 1 cm, 49,272.30

DG MORTAR JENIS PC-PP TYPE N (campuran 1PC : 4PP)

80 P.04.d m2 TRASRAAM TEBAL 1,5 cm, 66,100.50

DG MORTAR JENIS PC-PP TYPE M (campuran 1PC : 2PP)

81 P.04.e m2 PLESTERAN TEBAL 1,5 cm, 65,780.70

DG MORTAR JENIS PC-PP TYPE S (campuran 1PC : 3PP)

82 P.04.f m2 PLESTERAN TEBAL 1,5 cm, 62,254.72

DG MORTAR JENIS PC-PP TYPE N (campuran 1PC : 4PP)

83 P.05 m3 PASANGAN BATU KOSONG 406,340.00

P.06 PASANGAN BATU BRONJONG KAWAT (SNI 03-0009-1999)

P.06.a PASANGAN BATU BRONJONG KAWAT BENTUK I

P.06.a.1

84 a) 2 m3 Bentuk I, tipe A Bronjong kawat 1,357,560.60

Uk.L=2.0mxB=1.0mxT=1.0m berisi Batu (buat sendiri)

Kawat Bronjong galvanis dg kawat anyaman tiga lilitan

85 b) 2 m3 Kawat Bronjong galvanis dg kawat anyaman tiga 1,376,707.20

lilitan Uk.3,0 mm, kwat sisi 4,0 mm dan kawat

pengikat 2,0mm, ukuran lobang heksagonal 100 x 120 mm

86 c) 2 m3 Kawat Bronjong wire mesh 5 mm ulir dan kawat 1,889,063.00

pengikat 2,0mm, ukuran lobang heksagonal 100 x 100 mm

P.06.a.2 Bentuk I, tipe B Bronjong kawat

Uk.L=3.0m x B=1.0m x T=1.0m berisi Batu (buat sendiri)

87 a) 3 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,432,821.60

Uk.2,70 mm, kwat sisi 3,40 mm dan kawat pengikat

2,0mm, ukuran lobang heksagonal 80 x 100 mm

88 b) 3 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,027,898.40

Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat

2,0mm, ukuran lobang heksagonal 100 x 120 mm


JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp
89 c) 3 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 2,717,979.00

2,0mm, ukuran lobang heksagonal 100 x 100 mm

P.06.a.3 Bentuk I, tipe C Bronjong kawat

Uk.L=4.0m x B=1.0m x T=1.0m berisi Batu (buat sendiri)

90 a) 4 m3 Kawat Bronjong galvanis dg kawat anyaman tiga 2,721,615.60

lilitan Uk.2,70 mm, kwat sisi 3,40 mm & kawat pengikat

2,0mm, ukuran lobang heksagonal 80 x 100 mm

91 b) 4 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,716,969.20

Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat

2,0mm, ukuran lobang heksagonal 100 x 120 mm

92 c) 4 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat 3,582,788.00

pengikat 2,0mm uk. lobang heksagonal 100x100 mm

P.06.a.4 Bentuk I, tipe D Bronjong kawat

Uk.L=2.0m x B=1.0m x T=0.5m berisi Batu (buat sendiri)

93 a) 1 m3 Kawat Bronjong galvanis dg kawat anyaman tiga 821,999.20

lilitan Uk.2,70 mm, kwat sisi 3,40 mm & kawat pengikat

2,0mm uk. lobang heksagonal 80 x 100 mm

94 b) 1 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 835,533.60

Uk.3,0 mm, kwat sisi 4,0 mm & kawat pengikat

2,0mm, ukuran lobang heksagonal 100 x 120 mm

95 c) 1 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 1,152,892.40

2,0mm, ukuran lobang heksagonal 100 x 100 mm

P.06.a.5 Bentuk I, tipe E Bronjong kawat

Uk.L=3.0m x B=1.0m x T=0.5m berisi Batu (buat sendiri)

96 a) 1.5 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,191,678.40

Uk.2,70 mm, kwat sisi 3,40 mm & kawat pengikat

2,0mm, ukuran lobang heksagonal 80 x 100 mm

97 b) 1.5 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,445,543.00

Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat

2,0mm, ukuran lobang heksagonal 100 x 120 mm

98 c) 1.5 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 2,004,167.00

2,0mm, ukuran lobang heksagonal 100 x 100 mm

P.06.a.6 Bentuk I, tipe F Bronjong kawat

Uk.L=4.0m x B=1.0m x T=0.5m berisi Batu (buat sendiri)

99 a) 2 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,575,035.00

Uk.2,70 mm, kwat sisi 3,40 mm & kawat pengikat

2,0mm, ukuran lobang heksagonal 80 x 100 mm

100 b) 2 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,600,506.60

Uk.3,0 mm, kwat sisi 4,0 mm & kawat pengikat

2,0mm, ukuran lobang heksagonal 100 x 120 mm

101 c) 2 m3 Kawat Bronjong wire mesh 5 mm ulir&kawat pengikat 2,192,927.00

2,0mm, ukuran lobang heksagonal 100 x 100 mm

102 P.06.a.7 1 m3 Pasangan bronjong pabrikasi (tenaga kerja untuk 1m3 batu bronjong) 727,760.00
JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp
P.06 PASANGAN BATU BRONJONG KAWAT (SNI 03-0009-1999)

P.06.b PASANGAN BATU BRONJONG KAWAT BENTUK II

P.06.b.1 Bentuk II, tipe G Bronjong kawat

Uk.L=6.0mxB=2.0mxT=0.17m berisi Batu (buat sendiri)

103 a) 2.04 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,498,535.60

Uk.2,00 mm, kwat sisi 3,40 mm & Kawat pengikat

2,0mm, ukuran lobang heksagonal 60 x 80 mm

104 b) 2.04 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,177,568.80

Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat

2,0mm, ukuran lobang heksagonal 80 x 100 mm

P.06.b.2 Bentuk II, tipe H Bronjong kawat

Uk.L=6.0m x B=2.0m x T=0.23m berisi Batu (buat sendiri)

105 a) 2.76 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,274,188.40

Uk.2,00 mm, kwat sisi 3,40 mm & kawat pengikat

2,0mm, ukuran lobang heksagonal 60 x 80 mm

106 b) 2.76 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,536,903.60

Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat

P.06.b.3 Bentuk II, tipe I Bronjong kawat

Uk.L=6.0m x B=2.0m x T=0,30m berisi Batu (buat sendiri)

107 a) 3.6 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,643,665.20

Uk.2,00 mm, kwat sisi 3,40 mm & kawat pengikat

2,0mm, ukuran lobang heksagonal 60 x 80 mm

108 b) 3.6 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 3,197,642.80

Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat

2,0mm, ukuran lobang heksagonal 80 x 100 mm

109 P.06.b.4) 1 m3 Pasangan bronjong pabrikasi (tenaga kerja untuk 1m3 batu 786,962.00

bronjong)

P.07. Cerucuk dan Pemasangan Modul Bronjong

110 a) 1 m3 Panjang Cerucuk Kayu / Dolken Ø 8 - 10 cm 26,531.18

111 b) 1 m' Panjang Cerucuk Bambu Ø 8 - 10 cm 27,902.74

112 c) 1 m' Panjang Cerucuk Tiang Beton Ø 10 - 15 cm 118,243.40

113 d) 1 m3 Pemasangan Modul Bronjong Kawat menjadi 321,733.50

Struktur Krib Sungai

P.08 PASANGAN BATU MUKA DAN BATU CANDI

114 a) 1 m2 Pasangan Batu Muka 332,730.20

115 b) 1 m2 Pasangan Batu Candi 321,180.20

P.09 PASANGAN GEOTEKSTIL

116 a) 1 m2 Pemasangan Geotekstil Tipe A 24,799.50

117 b) 1 m2 Pemasangan Geotekstil Tipe B 31,165.20

118 c) 1 m2 Pemasangan Geotekstil Tipe C 39,369.00

119 P.10 1 bh PASANGAN BAR SCREEN / SARINGAN KASAR 463,375.00


JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp
BANGUNAN PENGUKUR DAPAT TERBUAT DARI BETON

ATAU PASANGAN BATU KALI DIPLESTER / BATU MUKA

YANG DILENGKAPI ALAT AMBANG UKUR, AMBANG UKUR

DARI BAJA PROFIL L.40.40.4&PEMASANGAN PAKAI RAAM SET

PASANGAN AMBANG UKUR PADA BANGUNAN

120 P.11 1 bh PASANGAN AMBANG UKUR PADA BANGUNAN 11,692,872.40

P.12 PASANGAN LEMPENG RUMPUT

121 a) 1 m2 Penanaman Rumput Lempengan 27,098.50

122 b) 1 m2 Pembabadan Rumput 1,666.50

P.13 PEKERJAAN PANTAI

123 a) 1 ph Penanaman Pohon bakau 3,268.32

124 b) 1 m2 Matras Bambu 111,320.00

P.14 PASANGAN GEOTEKSTIL

125 a) 1 m2 Pemasangan Geotekstil Tipe A 24,799.50

126 b) 1 m2 Pemasangan Geotekstil Tipe B 31,165.20

127 c) 1 m2 Pemasangan Geotekstil Tipe C 39,369.00

128 P.10 1 bh PASANGAN BAR SCREEN / SARINGAN KASAR 463,375.00

129 P.11 1 bh PASANGAN AMBANG UKUR PADA 11,690,672.40

BANGUNAN PENGUKUR DAN/ATAU PENGATUR

P.12 PASANGAN LEMPENG RUMPUT

130 a) 1 m2 Penanaman Rumput Lempengan 22,924.00

131 b) 1 m2 Pembabadan Rumput 1,127.50

PEKERJAAN BETON

1 B.01 1 m3 Beton Untuk Lantai Kerja 879,227.80

B.02 1 m3 Beton Mutu f'c=7,4 Mpa (K100), slump (12±2) cm, w/c =0,87

2 a) Manual 964,290.25

3 b) Menggunakan Molen 949,201.55

B.03 1 m3 Beton Mutu f'c=9,8 Mpa (K125), slump (12±2) cm, w/c =0,78

4 a) Manual 993,364.41

5 b) Menggunakan Molen 978,275.71

B.04 1 m3 Beton Mutu f'c=12,2 Mpa (K150), slump (12±2) cm, w/c =0,72

6 Manual 1,016,011.20

7 Menggunakan Molen 1,000,922.50

B.05 1 m3 Beton Mutu f'c=14,5 Mpa (K175), slump (12±2) cm, w/c =0,66

8 Manual 1,042,934.84

9 Menggunakan Molen 1,027,846.14

B.06 1 m3 Beton Mutu f'c=16,9 Mpa (K200), slump (12±2) cm, w/c =0,61

10 a) Manual 1,068,549.18

11 b) Menggunakan Molen 1,053,460.48

B.07 1 m3 Beton Mutu f'c=19,3 Mpa (K225), slump (12±2) cm, w/c =0,58

12 a) Manual 1,088,055.79

13 b) Menggunakan Molen 1,072,967.09


JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp
B.08 1 m3 Beton Mutu f'c=21,7 Mpa (K250), slump (12±2) cm, w/c =0,56

14 a) Manual 1,100,683.56

15 b) Menggunakan Molen 1,085,594.86

B.09 1 m3 Beton Mutu f'c=24,0 Mpa (K275) kedap air

slump (12±2) cm, w/c =0,53

16 a) Manual 1,122,754.68

17 b) Menggunakan Molen 1,107,665.98

B.10 1 m3 Beton Mutu f'c=26,4 Mpa (K300) kedap air,

slump (12±2) cm, w/c =0,52

18 a) Manual 1,129,430.75

19 b) Menggunakan Molen 1,114,342.05

B.11 1 m3 Beton Mutu f'c=28,8 Mpa (K325) kedap air,

slump (12±2) cm, w/c =0,49

20 a) Manual 1,199,749.38

21 b) Menggunakan Molen 1,174,743.08

B.12 1 m3 Beton Mutu f'c=31,2 Mpa (K350) kedap air,

slump (12±2) cm, w/c =0,48

22 a) Manual 1,208,668.64

23 b) Menggunakan Molen 1,183,662.34

PEKERJAAN BETON

MENGGUNAKAN READY MIXED & BAHAN ADIKTIF

1 B.13 1 m3 Beton Menggunakan Ready Mixed dan Pompa Beton 1,321,650.00

PENAMBAHAN KOEFISIEN TENAGA KERJA &

PERALATAN UNTUK MENGANGKUT

/MENAIKKAN CAMPURAN BETON DENGAN JARAK > 5 M

2 B.14 1 m3 Beton Dicorkan pada tapak berjarak <25 m

a) dg Ketinggian/kedalaman < 1m

Manual 34,456.40

3 b) Beton Dicorkan pada tapak berjarak

setiap tambahan jarak 25 m (horizontal)

Manual 42,020.00

4 c) Beton Dicorkan pada tapak berjarak

Menggunakan Peralatan Pompa Beton 76,208.00

5 B.15 1 m3 Beton Dicorkan Menggunakan Vibrator

a) Vibrator 37,510.00

6 b) Tenaga Kerja Manual dan Vibrator 58,520.00

7 B.16 1 m3 Beton Dicorkan pada tapak Tiap Kenaikan 4 m (vertikal)

a) Manual 21,010.00

8 b) Menggunakan peralatan pompa beton 76,208.00

PEKERJAAN PEMBESIAN BETON

9 B.17 100 kg Pembesian dengan Besi Polos atau Ulir 1,597,068.00

10 B.18 100 kg Pembesian dengan Jaring Kawat (wire mesh) 1,501,390.00


JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp
11 B.19 100 kg Pembesian Kabel presstreed polos 1,893,870.00
JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp
PENAMBAHAN KOEFISIEN TENAGA KERJA & PERALATAN

UNTUK MENGANGKUT / MENAIKAN 100 KG

TULANGAN SETIAP KENAIKAN VERTIKAL 4 M' ATAU

JARAK HORIZONTAL 25 M' KE TAPAK PEMASANGAN

12 B.20

a) 4 m' Manual 33,352.00

b) 10 s/d 25 m' Mekanis (penambahan jarak horizontal) 22,539.00

c) 25 m' Mekanis (penambahan jarak horizontal) 35,827.00

d) 4 m' Mekanis (penambahan tiap 4 m' jarak vertikal) 35,827.00

PEKERJAAN BEKISTING

1 B.21.b 1 m2 Bekisting untuk permukaan beton biasa 76,214.60

dg multipleks 12 mm atau 18 mm (tanpa perancah)

2 B.21.c 1 m2 Bekisting untuk permukaan beton biasa 75,702.00

dengan papan ukuran 3/20 (tanpa perancah)

3 B.21.a 1 m2 Bekisting untuk permukaan beton expose 107,276.40

dg multipleks 12 / 18 mm & kaso 5/7 (tanpa perancah)

4 B.21.d 1 m2 Perancah Beksiting kaso 5/7 tinggi 4m' 95,199.50

5 B.21.e 1 m2 Perancah Beksiting kayu dolken Ø 8 - 10 cm tinggi 4m' 61,975.65

6 B.23.b 1 m2 Bekisting balok beton biasa dg multipleks 12/18 mm 97,659.10

Tanpa perancah

7 B.23.d 1 m2 Perancah Beksiting balok dengan kaso 5/7 tinggi 4m' 79,041.60

8 B.23.e 1 m2 Perancah Beksiting kayu dolken Ø 8 - 10 cm tinggi 4m' 63,353.95

9 B.24.b 1 m2 Bekisting Kolom beton biasa dg multipleks 12/18 mm 81,876.30

10 B.24.c 1 m2 Bekisting Kolom beton biasa dg papan uk.3/20 cm 105,496.60

11 B.25.b 1 m2 Bekisting Dinding beton biasa dengan 81,672.80

Multipleks 12 cm / 18 cm

12 B.25.c 1 m2 Bekisting Dinding beton biasa dengan 105,439.40

Papan 3/20 cm

13 B.26.a 1 m2 Bekisting Pondasi dan sloof beton biasa dengan 87,213.50

Multipleks 12 cm / 18 cm

14 B.26.b 1 m2 Bekisting Pondasi dan sloof beton biasa dengan 108,251.00

Papan 3/20 cm

BONGKAR BEKISTING

Bongkar Beksiting tiap m2 diambil untuk kondisi biasa 10% - 15% dari Upah Kerja Pemasangan

untuk pembongkaran material pakai ulang maka biaya bongkar 20% - 25% dari Upah Pemasangan

Jika tidak ditentukan lain dapat menggunakan acuan sebagai berikut :

15 B.27.a 1 m2 Bongkar Bekisting secara Biasa, 3,361.60

16 B.27.b 1 m2 Bongkar Bekisting secara Biasa, 5,042.40

dengan hati-hati

KOEFISIEN UNT ANALISIS HARGA SATUAN PEKERJAAN PELAKSANAAN CURING

ada berbagai cara pelaksanaan curing beton diantaranya :

menggenangi atau menyiram permukaan beton, dan dengan uap (steam).


JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp
Jika tidak ditentukan dapat menggunakan acuan sebagai berikut

17 B.28.a 100 m2 Menggenangi air permukaan beton 88,286.00

18 B.28.b 100 m2 Menyirami air permukaan beton 123,332.00

a) Memasang terpal / karung goni basah

17 B.28.c 100 m2 Menyirami air permukaan beton 257,840.00

b) dengan air selama 4 hari

AHSP (ANALISA HARGA SATUAN PEKERJAAN)

PEMANCANGAN SECARA MANUAL / TANPA MESIN MENGGUNAKAN TRIPOD DAN HAMMER

1 F.01 1 m' Tiang pancang kayu gelondong 78,490.50

2 F.03 1 m' Tiang pancang baja pipa atau kotak Ø 30cm 773,300.00

3 F.04.c 1 m' Tiang pancang beton bertulang 30 x 30 cm 354,671.08

4 F.04.d 1 m' Tiang pancang beton bertulang 40 x 40 cm 584,744.36

5 F.05.a 1 m' Turap Kayu Dolken Ø 8 - 10 cm 264,055.00

6 F.06 1 m' Turap Baja Profil Larsen 111,925.00

7 F.07.a 1 m' Turap Beton Bertulang Precast (12 x 30 cm) 136,422.00

8 F.07.b 1 m' Turap Beton Bertulang Precast (15 x 40 cm) 226,206.20

9 F.07.c 1 m' Turap Beton Bertulang Precast (22 x 50 cm) 374,814.00

AHSP Pemancangan Secara Mekanis

10 F.10 1 m' Tiang pancang kayu gelondong 36,081.87

11 F.11 1 m' Tiang pancang baja pipa atau kotak Ø 30cm 745,991.95

12 F.12 1 m' Tiang pancang beton bertulang 30 x 30 cm 300,538.76

13 F.13 1 m' Tiang pancang beton bertulang 40 x 40 cm 531,823.25

14 F.14 1 m' Turap Kayu Dolken Ø 10 - 12 cm 49,658.32

15 F.15 1 m' Turap Baja Profil Larsen lebar 350 mm 75,484.86

16 F.16 1 m' Turap Beton Bertulang Precast (12 x 30 cm) 105,848.38

17 F.17 1 m' Turap Beton Bertulang Precast (15 x 40 cm) 165,935.66

18 F.18 1 m' Turap Beton Bertulang Precast (22 x 50 cm) 322,027.20

Tim Survey

1 Muhamad Arifin, S.Si, MT 1

2 Ir. Dradjat Nugroho Edi 2

3 Eko Prayitno, ST 3

4 Teguh Achmad Sumarsono, ST 4

5 Iksanudin, S.ST, MT 5

6 Bachtiar Achmad, ST, Mec, Dev 6

7 Agus Muslim, ST 7

8 Suparno 8

Kebumen,

KEPALA DINAS PEKERJAAN UMUM

DAN PENATAAN RUANG

KABUPATEN KEBUMEN
JUMLAH
No. SNI KODE SAT. URAIAN PEKERJAAN
Rp

H. SLAMET MUSTOLKHAH, ST, MT


NIP. 19690922 199703 1 005
ANALISA HARGA SATUAN PEKERJAAN

SUMBER DATA : PASARAN BEBAS


D A E R A H : KABUPATEN KEBUMEN

HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
A.1 HARGA SATUAN PEKERJAAN TANAH
A.1.1 PEKERJAAN TANAH SECARA MANUAL
a AHSP PEMBERSIHAN & PENGUPASAN PERMUKAAN TANAH
1 T.01.a 1 m2 PEMBERSIHAN DAN STRIPING / KOSREKAN 5,042.40
A TENAGA 4,584.00
L.01 0.060 OH Pekerja 68,000.00 4,080.00
L.04 0.006 OH Mandor 84,000.00 504.00

B BAHAN -
C PERALATAN
D Jumlah A + B + C 4,584.00
E OVERHEAD & PROFIT (CONTOH) 10% 458.40
F Harga Satuan Pekerjaan (D+E) 5,042.40

2 T.01.b 1 m2 TEBAS TEBANG BERUPA MEMOTONG & MEMBERSIHAKAN 6,444.57


LOKASI DARI TANAMAN / TUMBUHAN Ø < 15 CM
A TENAGA 5,730.00
L.01 0.075 OH Pekerja 68,000.00 5,100.00
L.04 0.0075 OH Mandor 84,000.00 630.00

B BAHAN 128.70
0.010 ltr Minyak Tanah 12,870.00 128.70
C PERALATAN
D Jumlah A + B + C 5,858.70
E OVERHEAD & PROFIT (CONTOH) 10% 585.87
F Harga Satuan Pekerjaan (D+E) 6,444.57

3 T.01.c 1 bh CABUT TUNGGUL POHON TANAMAN KERAS Ø > 15 CM & 20,108.00


MEMBUANG SISA TUNGGUL KAYU & AKAR-AKARNYA
A TENAGA 15,280.00
L.01 0.200 OH Pekerja 68,000.00 13,600.00
L.04 0.020 OH Mandor 84,000.00 1,680.00

B BAHAN -
-
C PERALATAN 3,000
0.100 hari Chainswaw 30,000 3,000
D Jumlah A + B + C 18,280.00
E OVERHEAD & PROFIT (CONTOH) 10% 1,828.00
F Harga Satuan Pekerjaan (D+E) 20,108.00

b AHSP UITZET TRASE SALURAN DAN PASANG PROFIL MELINTANG


4 T.02.a 1 m' UITZET TRASE SALURAN 2,520.32
A TENAGA 1,384.00
L.01 0.012 OH Pekerja 68,000 816.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
L.05 0.004 OH Juru Ukur 74,000 296.00
L.06 0.004 OH Pembantu Juru Ukur 68,000 272.00
B BAHAN -
C PERALATAN 907.20
0.004 hr water pass 90,800 363.20
0.004 hr Theodalith 136,000 544.00
D Jumlah A + B + C 2,291.20
E OVERHEAD & PROFIT (CONTOH) 10% 229.12
F Harga Satuan Pekerjaan (D+E) 2,520.32

5 T.02.b.1 1 m' PASANG PROFIL MELINTANG GALIAN TANAH 25,181.42


A TENAGA 8,904.00
L.01 0.0600 OH Pekerja 68,000 4,080.00
L.02 0.0200 OH Tukang Kayu 74,000 1,480.00
L.04 0.0060 OH Mandor 84,000 504.00
L.05 0.0200 OH Juru Ukur 74,000 1,480.00
L.06 0.0200 OH Pembantu Juru Ukur 68,000 1,360.00
B BAHAN 13,625.00
0.0025 m3 Kaso 4x6x4.00 cm 5,450,000 13,625.00
0.0042 m3 Papan 2x20x4.00 cm 5,450,000 22,890.00
0.2000 kg Paku 13,300 2,660.00
C PERALATAN 363.20
0.0040 hr water pass 90,800 363.20
D Jumlah A + B + C 22,892.20
E OVERHEAD & PROFIT (CONTOH) 10% 2,289.22
F Harga Satuan Pekerjaan (D+E) 25,181.42

c AHSP PEKERJAAN TANAH CARA MANUAL


T.06 GALIAN TANAH BIASA
6 T.06.a 1 m3 GALIAN TANAH BIASA sedalam < 1 m 47,314.52
A TENAGA 43,013.20
L.01 0.5630 OH Pekerja 68,000 38,284.00
L.04 0.0563 OH Mandor 84,000 4,729.20

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 43,013.20
E OVERHEAD & PROFIT (CONTOH) 10% 4,301.32
F Harga Satuan Pekerjaan (D+E) 47,314.52

7 T.06.a.2 1 m3 GALIAN TANAH BIASA sedalam s/d 2 m 56,727.00


A TENAGA 51,570.00
L.01 0.6750 OH Pekerja 68,000 45,900.00
L.04 0.0675 OH Mandor 84,000 5,670.00

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 51,570.00
E OVERHEAD & PROFIT (CONTOH) 10% 5,157.00
F Harga Satuan Pekerjaan (D+E) 56,727.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
8 T.06.a.3 1 m3 GALIAN TANAH BIASA sedalam s/d 3 m 63,870.40
A TENAGA 58,064.00
L.01 0.7600 OH Pekerja 68,000 51,680.00
L.04 0.0760 OH Mandor 84,000 6,384.00

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 58,064.00
E OVERHEAD & PROFIT (CONTOH) 10% 5,806.40
F Harga Satuan Pekerjaan (D+E) 63,870.40

9 T.06.a.4 1 m3 GALIAN TANAH BIASA dg kedalaman > 3 m, 6,303.00


TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m
A TENAGA 5,730.00
L.01 0.0750 OH Pekerja 68,000 5,100.00
L.04 0.0075 OH Mandor 84,000 630.00

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 5,730.00
E OVERHEAD & PROFIT (CONTOH) 10% 573.00
F Harga Satuan Pekerjaan (D+E) 6,303.00

T.07 GALIAN TANAH BERBATU


10 T.07.a.1 1 m3 GALIAN TANAH BERBATU sedalam < 1 m 113,538.04
A TENAGA 103,216.40
L.01 1.3510 OH Pekerja 68,000 91,868.00
L.04 0.1351 OH Mandor 84,000 11,348.40

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 103,216.40
E OVERHEAD & PROFIT (CONTOH) 10% 10,321.64
F Harga Satuan Pekerjaan (D+E) 113,538.04

11 T.07.a.2 1 m3 GALIAN TANAH BERBATU sedalam s/d 2 m 113,586.00


A TENAGA 103,260.00
L.01 1.5000 OH Pekerja 68,000 102,000.00
L.04 0.0150 OH Mandor 84,000 1,260.00
B BAHAN -
C PERALATAN -
D Jumlah A + B + C 103,260.00
E OVERHEAD & PROFIT (CONTOH) 10% 10,326.00
F Harga Satuan Pekerjaan (D+E) 113,586.00

12 T.07.a.3 1 m3 GALIAN TANAH BERBATU sedalam s/d 3 m 138,666.00


A TENAGA 126,060.00
L.01 1.6500 OH Pekerja 68,000 112,200.00
L.04 0.1650 OH Mandor 84,000 13,860.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
B BAHAN -
C PERALATAN -
D Jumlah A + B + C 126,060.00
E OVERHEAD & PROFIT (CONTOH) 10% 12,606.00
F Harga Satuan Pekerjaan (D+E) 138,666.00

13 T.07.a.4 1 m3 GALIAN TANAH BERBATU dg kedalaman > 3 m, 11,765.60


TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m
A TENAGA 10,696.00
L.01 0.1400 OH Pekerja 68,000 9,520.00
L.04 0.0140 OH Mandor 84,000 1,176.00

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 10,696.00
E OVERHEAD & PROFIT (CONTOH) 10% 1,069.60
F Harga Satuan Pekerjaan (D+E) 11,765.60

T.08 GALIAN BATU


14 T.08.a.1 1 m3 GALIAN BATU sedalam < 1 m 283,887.12
A TENAGA 258,079.20
L.01 3.3780 OH Pekerja 68,000 229,704.00
L.04 0.3378 OH Mandor 84,000 28,375.20
B BAHAN -
C PERALATAN -
D Jumlah A + B + C 258,079.20
E OVERHEAD & PROFIT (CONTOH) 10% 25,807.92
F Harga Satuan Pekerjaan (D+E) 283,887.12

15 T.08.a.2 1 m3 GALIAN BATU sedalam s/d 2 m 315,150.00


A TENAGA 286,500.00
L.01 3.7500 OH Pekerja 68,000 255,000.00
L.04 0.3750 OH Mandor 84,000 31,500.00

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 286,500.00
E OVERHEAD & PROFIT (CONTOH) 10% 28,650.00
F Harga Satuan Pekerjaan (D+E) 315,150.00

16 T.08.a.3 1 m3 GALIAN BATU sedalam s/d 3 m 346,711.20


A TENAGA 315,192.00
L.01 4.1250 OH Pekerja 68,000 280,500.00
L.04 0.4130 OH Mandor 84,000 34,692.00

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 315,192.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
E OVERHEAD & PROFIT (CONTOH) 10% 31,519.20
F Harga Satuan Pekerjaan (D+E) 346,711.20
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7

17 T.08.a.4 1 m3 GALIAN BATU dg kedalaman > 3 m, 31,515.00


TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m
A TENAGA 28,650.00
L.01 0.3750 OH Pekerja 68,000 25,500.00
L.04 0.0375 OH Mandor 84,000 3,150.00
B BAHAN -
C PERALATAN -
D Jumlah A + B + C 28,650.00
E OVERHEAD & PROFIT (CONTOH) 10% 2,865.00
F Harga Satuan Pekerjaan (D+E) 31,515.00

T.09 GALIAN TANAH CADAS ATAU TANAH KERAS


18 T.09.a.1 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam ≤ 1 m 105,050.00
A TENAGA 95,500.00
L.01 1.2500 OH Pekerja 68,000 85,000.00
L.04 0.1250 OH Mandor 84,000 10,500.00

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 95,500.00
E OVERHEAD & PROFIT (CONTOH) 10% 9,550.00
F Harga Satuan Pekerjaan (D+E) 105,050.00

19 T.09.a.2 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam s/d 2 m 116,983.68
A TENAGA 106,348.80
L.01 1.3920 OH Pekerja 68,000 94,656.00
L.04 0.1392 OH Mandor 84,000 11,692.80

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 106,348.80
E OVERHEAD & PROFIT (CONTOH) 10% 10,634.88
F Harga Satuan Pekerjaan (D+E) 116,983.68

20 T.09.a.3 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam s/d 3 m 126,060.00
A TENAGA 114,600.00
L.01 1.5000 OH Pekerja 68,000 102,000.00
L.04 0.1500 OH Mandor 84,000 12,600.00

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 114,600.00
E OVERHEAD & PROFIT (CONTOH) 10% 11,460.00
F Harga Satuan Pekerjaan (D+E) 126,060.00

21 T.09.a.4 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS dg kedalaman > 3 m, 8,404.00
TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
A TENAGA 7,640.00
L.01 0.1000 OH Pekerja 68,000 6,800.00
L.04 0.0100 OH Mandor 84,000 840.00
B BAHAN -
C PERALATAN -
D Jumlah A + B + C 7,640.00
E OVERHEAD & PROFIT (CONTOH) 10% 764.00
F Harga Satuan Pekerjaan (D+E) 8,404.00

T.10 GALIAN LUMPUR


22 T.10.a.1 1 m3 GALIAN LUMPUR sedalam ≤ 1 m 69,753.20
A TENAGA 63,412.00
L.01 0.8300 OH Pekerja 68,000 56,440.00
L.04 0.0830 OH Mandor 84,000 6,972.00

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 63,412.00
E OVERHEAD & PROFIT (CONTOH) 10% 6,341.20
F Harga Satuan Pekerjaan (D+E) 69,753.20

23 T.10.a.2 1 m3 GALIAN LUMPUR sedalam s/d 2 m 84,040.00


A TENAGA 76,400.00
L.01 1.0000 OH Pekerja 68,000 68,000.00
L.04 0.1000 OH Mandor 84,000 8,400.00
B BAHAN -
C PERALATAN -
D Jumlah A + B + C 76,400.00
E OVERHEAD & PROFIT (CONTOH) 10% 7,640.00
F Harga Satuan Pekerjaan (D+E) 84,040.00

24 T.10.a.3 1 m3 GALIAN LUMPUR sedalam s/d 3 m 96,646.00


A TENAGA 87,860.00
L.01 1.1500 OH Pekerja 68,000 78,200.00
L.04 0.1150 OH Mandor 84,000 9,660.00
B BAHAN -
C PERALATAN -
D Jumlah A + B + C 87,860.00
E OVERHEAD & PROFIT (CONTOH) 10% 8,786.00
F Harga Satuan Pekerjaan (D+E) 96,646.00

25 T.10.a.4 1 m3 GALIAN LUMPUR dg kedalaman > 3 m, 12,606.00


TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m
A TENAGA 11,460.00
L.01 0.1500 OH Pekerja 68,000 10,200.00
L.04 0.0150 OH Mandor 84,000 1,260.00

B BAHAN -
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
C PERALATAN -
D Jumlah A + B + C 11,460.00
E OVERHEAD & PROFIT (CONTOH) 10% 1,146.00
F Harga Satuan Pekerjaan (D+E) 12,606.00

T.11 GALIAN PASIR UNTUK FONDASI BANGUNAN


26 T.11.a.1 1 m3 GALIAN PASIR UNT FONDASI BANGUNAN sedalam ≤ 1 m 55,466.40
A TENAGA 50,424.00
L.01 0.6600 OH Pekerja 68,000 44,880.00
L.04 0.0660 OH Mandor 84,000 5,544.00
B BAHAN -
C PERALATAN -
D Jumlah A + B + C 50,424.00
E OVERHEAD & PROFIT (CONTOH) 10% 5,042.40
F Harga Satuan Pekerjaan (D+E) 55,466.40

27 T.11.a.2 1 m3 GALIAN PASIR UNT FONDASI BANGUNAN sedalam s/d 2 m 67,232.00


A TENAGA 61,120.00
L.01 0.8000 OH Pekerja 68,000 54,400.00
L.04 0.0800 OH Mandor 84,000 6,720.00

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 61,120.00
E OVERHEAD & PROFIT (CONTOH) 10% 6,112.00
F Harga Satuan Pekerjaan (D+E) 67,232.00

28 T.11.a.3 1 m3 GALIAN PASIR UNT FONDASI BANGUNAN sedalam s/d 3 m 77,316.80


A TENAGA 70,288.00
L.01 0.9200 OH Pekerja 68,000 62,560.00
L.04 0.0920 OH Mandor 84,000 7,728.00

B BAHAN -
C PERALATAN -
D Jumlah A + B + C 70,288.00
E OVERHEAD & PROFIT (CONTOH) 10% 7,028.80
F Harga Satuan Pekerjaan (D+E) 77,316.80

29 T.11.a.4 1 m3 GALIAN PASIR UNT FONDASI BANGUNAN dg kedalaman > 3 m, 1,306.80


TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m
A TENAGA 1,188.00
L.01 0.0150 OH Pekerja 68,000 1,020.00
L.04 0.0020 OH Mandor 84,000 168.00
B BAHAN -
C PERALATAN -
D Jumlah A + B + C 1,188.00
E OVERHEAD & PROFIT (CONTOH) 10% 118.80
F Harga Satuan Pekerjaan (D+E) 1,306.80
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
d AHSP PEKERJAAN TANAH menggunakan alat
T.07.b GALIAN TANAH BERBATU
30 T.07.b.1 1 m3 GALIAN TANAH BERBATU sedalam < 1 m 38,612.20
A TENAGA 32,852.00
L.01 0.4300 OH Pekerja 68,000 29,240.00
L.04 0.0430 OH Mandor 84,000 3,612.00
B BAHAN -
C PERALATAN 2,250.00
0.1250 hr Jack hammer 18,000 2,250.00
D Jumlah A + B + C 35,102.00
E OVERHEAD & PROFIT (CONTOH) 10% 3,510.20
F Harga Satuan Pekerjaan (D+E) 38,612.20

31 T.07.b.2 1 m3 GALIAN TANAH BERBATU sedalam s/d 2 m 44,495.00


A TENAGA 38,200.00
L.01 0.5000 OH Pekerja 68,000 34,000.00
L.04 0.0500 OH Mandor 84,000 4,200.00

B BAHAN -
C PERALATAN 2,250.00
0.1250 hr Jack hammer 18,000 2,250.00
D Jumlah A + B + C 40,450.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,045.00
F Harga Satuan Pekerjaan (D+E) 44,495.00

32 T.07.b.3 1 m3 GALIAN TANAH BERBATU sedalam s/d 3 m 48,697.00


A TENAGA 42,020.00
L.01 0.5500 OH Pekerja 68,000 37,400.00
L.04 0.0550 OH Mandor 84,000 4,620.00

B BAHAN -
C PERALATAN 2,250.00
0.1250 hr Jack hammer 18,000 2,250.00
D Jumlah A + B + C 44,270.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,427.00
F Harga Satuan Pekerjaan (D+E) 48,697.00

33 T.07.b.4 1 m3 GALIAN TANAH BERBATU dg kedalaman > 3 m, 15,921.40


TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m
A TENAGA 12,224.00
L.01 0.1600 OH Pekerja 68,000 10,880.00
L.04 0.0160 OH Mandor 84,000 1,344.00

B BAHAN -
C PERALATAN 2,250.00
0.1250 hr Jack hammer 18,000 2,250.00
D Jumlah A + B + C 14,474.00
E OVERHEAD & PROFIT (CONTOH) 10% 1,447.40
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
F Harga Satuan Pekerjaan (D+E) 15,921.40

T.08 GALIAN BATU


34 T.08.b.1 1 m3 GALIAN BATU sedalam < 1 m 88,990.00
A TENAGA 76,400.00
L.01 1.0000 OH Pekerja 68,000 68,000.00
L.04 0.1000 OH Mandor 84,000 8,400.00

B BAHAN -
C PERALATAN 4,500.00
0.2500 hr Jack hammer 18,000 4,500.00
D Jumlah A + B + C 80,900.00
E OVERHEAD & PROFIT (CONTOH) 10% 8,090.00
F Harga Satuan Pekerjaan (D+E) 88,990.00

35 T.08.b.2 1 m3 GALIAN BATU sedalam s/d 2 m 105,798.00


A TENAGA 91,680.00
L.01 1.2000 OH Pekerja 68,000 81,600.00
L.04 0.1200 OH Mandor 84,000 10,080.00

B BAHAN -
C PERALATAN 4,500.00
0.2500 hr Jack hammer 18,000 4,500.00
D Jumlah A + B + C 96,180.00
E OVERHEAD & PROFIT (CONTOH) 10% 9,618.00
F Harga Satuan Pekerjaan (D+E) 105,798.00

36 T.08.b.3 1 m3 GALIAN BATU sedalam s/d 3 m 115,882.80


A TENAGA 100,848.00
L.01 1.3200 OH Pekerja 68,000 89,760.00
L.04 0.1320 OH Mandor 84,000 11,088.00
B BAHAN -
C PERALATAN 4,500.00
0.2500 hr Jack hammer 18,000 4,500.00
D Jumlah A + B + C 105,348.00
E OVERHEAD & PROFIT (CONTOH) 10% 10,534.80
F Harga Satuan Pekerjaan (D+E) 115,882.80

37 T.08.b.4 1 m3 GALIAN BATU dg kedalaman > 3 m, 36,465.00


TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m
A TENAGA 28,650.00
L.01 0.3750 OH Pekerja 68,000 25,500.00
L.04 0.0375 OH Mandor 84,000 3,150.00

B BAHAN -
C PERALATAN 4,500.00
0.2500 hr Jack hammer 18,000 4,500.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
D Jumlah A + B + C 33,150.00
E OVERHEAD & PROFIT (CONTOH) 10% 3,315.00
F Harga Satuan Pekerjaan (D+E) 36,465.00

T.09 GALIAN TANAH CADAS ATAU TANAH KERAS


38 T.09.b.1 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam ≤ 1 m 29,367.80
A TENAGA 24,448.00
L.01 0.3200 OH Pekerja 68,000 21,760.00
L.04 0.0320 OH Mandor 84,000 2,688.00

B BAHAN -
C PERALATAN 2,250.00
0.1250 hr Jack hammer 18,000 2,250.00
D Jumlah A + B + C 26,698.00
E OVERHEAD & PROFIT (CONTOH) 10% 2,669.80
F Harga Satuan Pekerjaan (D+E) 29,367.80

39 T.09.b.2 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam s/d 2 m 37,771.80
A TENAGA 32,088.00
L.01 0.4200 OH Pekerja 68,000 28,560.00
L.04 0.0420 OH Mandor 84,000 3,528.00

B BAHAN -
C PERALATAN 2,250.00
0.1250 hr Jack hammer 18,000 2,250.00
D Jumlah A + B + C 34,338.00
E OVERHEAD & PROFIT (CONTOH) 10% 3,433.80
F Harga Satuan Pekerjaan (D+E) 37,771.80

40 T.09.b.3 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS sedalam s/d 3 m 44,495.00
A TENAGA 38,200.00
L.01 0.5000 OH Pekerja 68,000 34,000.00
L.04 0.0500 OH Mandor 84,000 4,200.00

B BAHAN -
C PERALATAN 2,250.00
0.1250 hr Jack hammer 18,000 2,250.00
D Jumlah A + B + C 40,450.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,045.00
F Harga Satuan Pekerjaan (D+E) 44,495.00

41 T.09.d 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS dg kedalaman > 3 m, 10,879.00
TAMBAHAN KOEFISIEN UNT SETIAP PENAMBAHAN KEDALAMAN 1 m
A TENAGA 7,640.00
L.01 0.1000 OH Pekerja 68,000 6,800.00
L.04 0.0100 OH Mandor 84,000 840.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
B BAHAN -
C PERALATAN 2,250.00
0.1250 hr Jack hammer 18,000 2,250.00
D Jumlah A + B + C 9,890.00
E OVERHEAD & PROFIT (CONTOH) 10% 989.00
F Harga Satuan Pekerjaan (D+E) 10,879.00
T.12 PERKUAT DINDING GALIAN SANGAT TERGANTUNG PADA POTENSI GALIAN TANAHNYA,
- UNT TANAH BIASA & TANAH BERBATU SERING DIPERLUKAN JIKA KEDALAMAN GALIAN LEBIH DARI 2 m
- UNT TANAH CADAS / KERAS APALAGI BATU PADA UMUMNYA TIDAK DIPERLUKAN PERKUATAN

HAL INI SERING DILAKUKAN PADA GALIAN TANAH DENGAN KEDALAMAN > 1 m DALAM RANGKA PEMASANGAN
PIPA, GORONG-GORONG ATAU BOX CULVERT

TABEL A.1 ASUMSI KOEFISIEN PEMAKAIAN ULANG BAHAN / MATERIAL


PEMAKAIAN BAHAN/ PENAMBAHAN MATERIAL CATATAN
NO.
MATERIAL 5% 35% 40% 50% - 5% UNT BAHAN BAJA/BESI : SV = 50%
1 PERTAMA 0.500 1.000 1.000 1.000 - 35% UNT BAHAN KASO/BALOK KAYU : SV = 0%
2 KEDUA 0.275 0.675 0.700 0.750 - 40% UNT BAHAN MULTIPLEKS/PAPAN KAYU ; SV = 0%
3 KETIGA 0.200 0.567 0.500 0.867 - 50% UNT BAHAN SESEG BAMBU DLL; SV = 0%
4 KEEMPAT 0.165 0.513 0.550 0.625

TABEL KOEFISIEN PEKERJAAN & BAHAN PERKUATAN DINDING GALIAN DENGAN RANGKA & DINDING
A.2 a) TIANG RANGKA PERKUATAN DINDING

1 m' PALING BAWAH SETIAP PENAMBAHAN TINGGI 1 m' JARAK


NO. BAHAN a) b) c) d) e) f) g) h) i) j) TIANG

BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN (m)
1 KASO 5/7 DIPAKAI 1 KALI 0.04200 m3 0.0150 m3

- DIPAKAI KE 2 0.02840 m3 0.860 OH 0.430 OH 0.086 OH 0.125 0.0101 m3 0.800 OH 0.300 OH 0.080 OH 0.120 0.5

- DIPAKAI KE 3 0.02380 m3 0.0085 m3


2 BAJA L.50.50.5 7.420 kg 4.950 kg

4.080 kg 1.000 OH 0.500 OH 0.100 OH 0.120 2.720 kg 0.72 OH 0.38 OH 0.072 OH 0.110 0.8
2.970 kg 1.980 kg

3 BAJA INP - 10 13.100 kg 4.950 kg


7.200 kg 1.200 OH 0.600 OH 0.120 OH 0.100 2.720 kg 0.86 OH 0.43 OH 0.086 OH 0.090 1

5.240 kg 1.980 kg

b) DINDING PERKUATAN
1 m' PALING BAWAH SETIAP PENAMBAHAN TINGGI 1 m'

NO. BAHAN a) b) c) d) e) f) g) h) i) j)

BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN
1 SESEG BAMBU KE-1 2.40 m2 2.00 m2

KE-2 1.80 m2 0.400 OH 0.200 OH 0.040 OH 0.06 1.50 m2 0.300 OH 0.150 OH 0.030 OH 0.050
KE-3 1.60 m2 1.33 m2

2 PAPAN 2/20 KE-1 0.048 m3 0.040 m3


KE-2 0.034 m3 0.500 OH 0.250 OH 0.050 OH 0.06 0.028 m3 0.376 OH 0.188 OH 0.0375 OH 0.070

KE-3 0.029 m3 0.024 m3


3 BALOK KAYU 8/12 KE-1 0.192 m3 0.180 m3

KE-2 0.130 m3 0.480 OH 0.230 OH 0.045 OH 0.09 0.108 m3 0.338 OH 0.169 OH 0.0338 OH 0.080
KE-3 0.109 m3 0.091 m3

TABEL KOEFISIEN PEKERJAAN & BAHAN PERKUATAN DINDING GALIAN DENGAN TURAP
A.3

1 m' PALING BAWAH SETIAP PENAMBAHAN TINGGI 1 m' JARAK


NO. BAHAN a) b) c) d) e) f) g) h) i) j) TIANG

BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN (m)
1 KASO 5/7 DIPAKAI KE-1 0.049612 m3 0.033075 m3

KE-2 0.033488 m3 0.840 OH 0.280 OH 0.084 OH 0.10 0.022326 m3 0.570 OH 0.190 OH 0.057 OH 0.070 5
KE-3 0.028130 m3 0.018754 m3

2 BALOK KAYU 8/12 KE-1 0.090720 m3 0.080480 m3


KE-2 0.061236 m3 1.280 OH 0.420 OH 0.126 OH 0.12 0.040824 m3 0.84 OH 0.28 OH 0.064 OH 0.06 5

KE-3 0.051438 m3 0.034292 m3

3 BAJA INP - 8 37.50 kg 25.00 kg


20.62 kg 1.500 oh 0.500 OH 0.150 OH 0.15 13.75 kg 1.2 OH 0.4 OH 0.12 OH 0.11 5

15.00 kg 10.00 kg
4 BAJA INP-10 52.500 kg 35.000 kg

28.860 kg 2.100 OH 0.700 OH 0.210 OH 0.160 19.220 kg 1.5 OH 0.5 OH 0.15 OH 0.120 5
21.000 kg 14.000 kg

5 PROFIL LARSEN U-400 71.860 kg 47.910 kg


39.520 kg 3.000 OH 1.000 OH 0.300 OH 0.240 26.350 kg 2.1 OH 0.7 OH 0.21 OH 0.180 5

28.750 kg 19.160 kg
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8= 4 X 7

42a T.12.a 1 m' PERKUATAN DINDING GALIAN UNT 1 m' PALING BAWAH
A TENAGA
L.01 b) + g) OH Pekerja (tabel A.2)
L.02 c) + h) OH Tukang
L.04 d) + i) OH Mandor
B BAHAN -
a) m3/kg Tiang rangka Perkuatan Dinding (Tabel A.2)
f) m2/m3 Dinding Perkuatan (tabel.A.2)
C PERALATAN -
e) + j) hr Tripod/Tackle Handle/Crane 2 ton
D Jumlah A + B + C -
E OVERHEAD & PROFIT (CONTOH) 10% -
F Harga Satuan Pekerjaan (D+E) -

42 T.12.a 1 m' PERKUATAN DINDING GALIAN UNT 1 m' PALING BAWAH 1,431,720.40
contoh MENGGUNAKAN BAJA INP-10 & BALOK KAYU 8/12
A TENAGA 180,844.00
L.01 1.660 OH Pekerja 68,000 112,880.00
L.02 0.730 OH Tukang 74,000 54,020.00
L.04 0.166 OH Mandor 84,000 13,944.00
B BAHAN 1,103,620.00
5.240 kg Tiang perkuatan dengan INP -10 13,000 68,120.00
0.109 m3 Dinding perkuatan kayu 8/12 9,500,000 1,035,500.00
C PERALATAN 17,100.00
0.190 hr Crane 2 ton 90,000 17,100.00
D Jumlah A + B + C 1,301,564.00
E OVERHEAD & PROFIT (CONTOH) 10% 130,156.40
F Harga Satuan Pekerjaan (D+E) 1,431,720.40

43a T.12.b 1 m' PENAMBAHAN TINGGI PERKUATAN DINDING GALIAN


A TENAGA
L.01 b) + g) OH Pekerja (tabel A.2)
L.02 c) + h) OH Tukang
L.04 d) + i) OH Mandor
B BAHAN -
a) m3/kg Tiang rangka Perkuatan Dinding (Tabel A.2)
f) m2/m3 Dinding Perkuatan (tabel.A.2)
C PERALATAN -
e) + j) hr Tripod/Tackle Handle/Crane 2 ton
D Jumlah A + B + C -
E OVERHEAD & PROFIT (CONTOH) 10% -
F Harga Satuan Pekerjaan (D+E) -

43 T.12.b 1 m' PENAMBAHAN TINGGI PERKUATAN DINDING GALIAN 1,282,604.40


contoh MENGGUNAKAN BAJA INP-10 & BALOK KAYU
A TENAGA 220,744.00
L.01 2.060 OH Pekerja 68,000 140,080.00
L.02 0.930 OH Tukang 74,000 68,820.00
L.04 0.141 OH Mandor 84,000 11,844.00
B BAHAN 929,960.00
5.240 kg Tiang perkuatan dengan INP -10 13,000 68,120.00
0.091 m3 Dinding perkuatan kayu 8/12 9,500,000 861,840.00
C PERALATAN 15,300.00
0.170 hr Crane 2 ton 90,000 15,300.00
D Jumlah A + B + C 1,166,004.00
E OVERHEAD & PROFIT (CONTOH) 10% 116,600.40
F Harga Satuan Pekerjaan (D+E) 1,282,604.40
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8= 4 X 7
44a T.12.c 1 m' PERKUATAN DINDING GALIAN DG TURAP PALING BAWAH
A TENAGA
L.01 b) OH Pekerja (Tabel A.3)
L.02 c) OH Tukang
L.04 d) OH Mandor
B BAHAN -
a) m3/kg Perkuatan Dinding galian dg Turap (Tabel A.3)

C PERALATAN -
e) hr Tripod/Tackle Handle/Crane 2 ton
D Jumlah A + B + C -
E OVERHEAD & PROFIT (CONTOH) 10% -
F Harga Satuan Pekerjaan (D+E) -

44 T.12.c 1 m' PERKUATAN DINDING GALIAN DG TURAP PALING BAWAH 396,110.00


contoh MENGGUNAKAN TURAP BAJA INP-8
A TENAGA 151,600.00
L.01 1.500 OH Pekerja 68,000 102,000.00
L.02 0.500 OH Tukang 74,000 37,000.00
L.04 0.150 OH Mandor 84,000 12,600.00
B BAHAN 195,000.00
15.000 kg Perkuatan Dinding galian dg Turap (Tabel A.3) 13,000 195,000.00
-
C PERALATAN 13,500.00
0.150 hr Crane 2 ton 90,000 13,500.00
D Jumlah A + B + C 360,100.00
E OVERHEAD & PROFIT (CONTOH) 10% 36,010.00
F Harga Satuan Pekerjaan (D+E) 396,110.00

45a T.12.d 1 m' PERKUATAN DINDING GALIAN DG TURAP UNTUK PENAMBAHAN TINGGI
A TENAGA
L.01 g) OH Pekerja (Tabel A.3)
L.02 h) OH Tukang
L.04 i) OH Mandor
B BAHAN -
f) m3/kg Perkuatan Dinding galian dg Turap (Tabel A.3)

C PERALATAN -
j) hr Tripod/Tackle Handle/Crane 2 ton
D Jumlah A + B + C -
E OVERHEAD & PROFIT (CONTOH) 10% -
F Harga Satuan Pekerjaan (D+E) -

45 T.12.d 1 m' PERKUATAN DINDING GALIAN DG TURAP UNTUK PENAMBAHAN TINGGI 287,298.00
contoh MENGGUNAKAN TURAP BAJA INP-8
A TENAGA 121,280.00
L.01 1.200 OH Pekerja 68,000 81,600.00
L.02 0.400 OH Tukang 74,000 29,600.00
L.04 0.120 OH Mandor 84,000 10,080.00
B BAHAN 130,000.00
10.00 kg Perkuatan Dinding galian dg Turap (Tabel A.3) 13,000 130,000.00
-
C PERALATAN 9,900.00
0.110 hr Crane 2 ton 90,000 9,900.00
D Jumlah A + B + C 261,180.00
E OVERHEAD & PROFIT (CONTOH) 10% 26,118.00
F Harga Satuan Pekerjaan (D+E) 287,298.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7

T.14 TIMBUNAN DAN PEMADATAN


46 T.14.a 1 m3 TIMBUNAN TANAH ATAU URUGAN TANAH KEMBALI 27,733.20
A TENAGA 25,212.00
L.01 0.330 OH Pekerja 68,000 22,440.00
L.04 0.033 OH Mandor 84,000 2,772.00
B BAHAN -

C PERALATAN -

D Jumlah A + B + C 25,212.00
E OVERHEAD & PROFIT (CONTOH) 10% 2,521.20
F Harga Satuan Pekerjaan (D+E) 27,733.20

47 T.14.b.1 1 m3 PEMADATAN TANAH 49,170.00


A TENAGA 38,200.00
L.01 0.500 OH Pekerja 68,000 34,000.00
L.04 0.050 OH Mandor 84,000 4,200.00
B BAHAN -
-
C PERALATAN 6,500.00
0.050 hr Pemadatan tanah (Stamper) 130,000 6,500.00
D Jumlah A + B + C 44,700.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,470.00
F Harga Satuan Pekerjaan (D+E) 49,170.00

48 T.14.c.1 1 m3 TIMBUNAN PASIR SEBAGAI BAHAN PENGISI 363,616.00


A TENAGA 30,560.00
L.01 0.400 OH Pekerja 68,000 27,200.00
L.04 0.040 OH Mandor 84,000 3,360.00
B BAHAN 300,000.00
1.200 m3 Pasir Pasang 250,000 300,000.00
C PERALATAN -
-
D Jumlah A + B + C 330,560.00
E OVERHEAD & PROFIT (CONTOH) 10% 33,056.00
F Harga Satuan Pekerjaan (D+E) 363,616.00

49 T.14.d 1 m3 PEMADATAN PASIR SEBAGAI BAHAN PENGISI 20,640.00


A TENAGA 7,640.00
L.01 0.100 OH Pekerja 68,000 6,800.00
L.04 0.010 OH Mandor 84,000 840.00
B BAHAN -
- -
C PERALATAN 13,000.00
0.100 hr Pemadatan tanah (Stamper) 130,000 13,000.00
D Jumlah A + B + C 20,640.00
E OVERHEAD & PROFIT (CONTOH) -
F Harga Satuan Pekerjaan (D+E) 20,640.00

T.15 ANGKUTAN MATERIAL DAN ATAU GALIAN


T.15.a. SECARA MANUAL
50 T.15.a.1 1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT > 3m S/D < 5 m 19,696.16
A TENAGA 17,905.60
L.01 0.2480 OH Pekerja 68,000 16,864.00
L.04 0.0124 OH Mandor 84,000 1,041.60
B BAHAN -

C PERALATAN -

D Jumlah A + B + C 17,905.60
E OVERHEAD & PROFIT (CONTOH) 10% 1,790.56
F Harga Satuan Pekerjaan (D+E) 19,696.16
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7

51 T.15.a.1 1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 5 m 19,696.16


A TENAGA 17,905.60
L.01 0.2480 OH Pekerja 68,000 16,864.00
L.04 0.0124 OH Mandor 84,000 1,041.60
B BAHAN -
-
C PERALATAN -
-
D Jumlah A + B + C 17,905.60
E OVERHEAD & PROFIT (CONTOH) 10% 1,790.56
F Harga Satuan Pekerjaan (D+E) 19,696.16

52 T.15.a.2 1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 10 m 21,602.24


A TENAGA 19,638.40
L.01 0.2720 OH Pekerja 68,000 18,496.00
L.04 0.0136 OH Mandor 84,000 1,142.40
B BAHAN -
-
C PERALATAN -
-
D Jumlah A + B + C 19,638.40
E OVERHEAD & PROFIT (CONTOH) 10% 1,963.84
F Harga Satuan Pekerjaan (D+E) 21,602.24

53 T.15.a.4 1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 30 m 28,273.52


A TENAGA 25,703.20
L.01 0.3560 OH Pekerja 68,000 24,208.00
L.04 0.0178 OH Mandor 84,000 1,495.20
B BAHAN -
- -
C PERALATAN -

D Jumlah A + B + C 25,703.20
E OVERHEAD & PROFIT (CONTOH) 10% 2,570.32
F Harga Satuan Pekerjaan (D+E) 28,273.52

54 T.15.a.5 1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 50 m 33,515.24


A TENAGA 30,468.40
L.01 0.4220 OH Pekerja 68,000 28,696.00
L.04 0.0211 OH Mandor 84,000 1,772.40
B BAHAN -

C PERALATAN -

D Jumlah A + B + C 30,468.40
E OVERHEAD & PROFIT (CONTOH) 10% 3,046.84
F Harga Satuan Pekerjaan (D+E) 33,515.24

55 T.15.a.6 1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 100 m 47,652.00


A TENAGA 43,320.00
L.01 0.6000 OH Pekerja 68,000 40,800.00
L.04 0.0300 OH Mandor 84,000 2,520.00
B BAHAN -
-
C PERALATAN -
-
D Jumlah A + B + C 43,320.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,332.00
F Harga Satuan Pekerjaan (D+E) 47,652.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8=4X7
56 T.15.a.7 1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 200 m 75,449.00
A TENAGA 68,590.00
L.01 0.9500 OH Pekerja 68,000 64,600.00
L.04 0.0475 OH Mandor 84,000 3,990.00
B BAHAN -
-
C PERALATAN -
-
D Jumlah A + B + C 68,590.00
E OVERHEAD & PROFIT (CONTOH) 10% 6,859.00
F Harga Satuan Pekerjaan (D+E) 75,449.00

57 T.15.a.8 1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 300 m 103,246.00


A TENAGA 93,860.00
L.01 1.3000 OH Pekerja 68,000 88,400.00
L.04 0.0650 OH Mandor 84,000 5,460.00
B BAHAN -
- -
C PERALATAN -
- -
D Jumlah A + B + C 93,860.00
E OVERHEAD & PROFIT (CONTOH) 10% 9,386.00
F Harga Satuan Pekerjaan (D+E) 103,246.00

58 T.15.a.9 1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 400 m 131,043.00


A TENAGA 119,130.00
L.01 1.6500 OH Pekerja 68,000 112,200.00
L.04 0.0825 OH Mandor 84,000 6,930.00
B BAHAN -

C PERALATAN -

D Jumlah A + B + C 119,130.00
E OVERHEAD & PROFIT (CONTOH) 10% 11,913.00
F Harga Satuan Pekerjaan (D+E) 131,043.00

59 T.15.a.10 1 m3 MENGANGKUT HASIL GALIAN DG JARAK ANGKUT 500 m 154,869.00


A TENAGA 140,790.00
L.01 1.9500 OH Pekerja 68,000 132,600.00
L.04 0.0975 OH Mandor 84,000 8,190.00
B BAHAN -
-
C PERALATAN -
-
D Jumlah A + B + C 140,790.00
E OVERHEAD & PROFIT (CONTOH) 10% 14,079.00
F Harga Satuan Pekerjaan (D+E) 154,869.00

60 T.15.a.11 1 m3 MENGANGKUT HASIL GALIAN DG 27,955.84


JARAK ANGKUT > 500 m SETIAP PENAMBAHAN 100 m
A TENAGA 25,414.40
L.01 0.3520 OH Pekerja 68,000 23,936.00
L.04 0.0176 OH Mandor 84,000 1,478.40
B BAHAN -
-
C PERALATAN -
-
D Jumlah A + B + C 25,414.40
E OVERHEAD & PROFIT (CONTOH) 10% 2,541.44
F Harga Satuan Pekerjaan (D+E) 27,955.84
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8= 4 X 7

A.2 PEKERJAAN PASANGAN


P.01 PASANGAN BATU DENGAN MORTAR JENIS PC - PP
61 P.01.a.2 1 m3 MORTAR TIPE M 944,884.60
(Mutu PP tertentu setara dg campuran 1PP : 2PP)
A TENAGA 204,120.00
L.01 1.80 OH Pekerja 68,000 122,400.00
L.02 0.90 OH Tukang Batu 74,000 66,600.00
L.03 - OH Kepala Tukang 80,000 -
L.04 0.18 OH Mandor 84,000 15,120.00
B BAHAN 649,280.00
1.200 m3 Batu 210,000 252,000.00
0.440 m3 Pasir Pasang 250,000 110,000.00
252 kg Portland Cement 1,140 287,280.00
C PERALATAN 5,586.00
0.076 hr Molen 73,500 5,586.00
D Jumlah A + B + C 858,986.00
E OVERHEAD & PROFIT (CONTOH) 10% 85,898.60
F Harga Satuan Pekerjaan (D+E) 944,884.60

62 P.01.b.2 1 m3 MORTAR TIPE S 894,559.60


(Mutu PP tertentu setara dg campuran 1PP : 3PP)
A TENAGA 204,120.00
L.01 1.80 OH Pekerja 68,000 122,400.00
L.02 0.90 OH Tukang Batu 74,000 66,600.00
L.03 - OH Kepala Tukang 80,000 -
L.04 0.18 OH Mandor 84,000 15,120.00
B BAHAN 603,530.00
1.200 m3 Batu 210,000 252,000.00
0.485 m3 Pasir Pasang 250,000 121,250.00
202 kg Portland Cement 1,140 230,280.00
C PERALATAN 5,586.00
0.076 hr Molen 73,500 5,586.00
D Jumlah A + B + C 813,236.00
E OVERHEAD & PROFIT (CONTOH) 10% 81,323.60
F Harga Satuan Pekerjaan (D+E) 894,559.60

63 P.01.c.2 1 m3 MORTAR TIPE N 855,278.60


(Mutu PP tertentu setara dg campuran 1PP : 4PP)
A TENAGA 204,120.00
L.01 1.80 OH Pekerja 68,000 122,400.00
L.02 0.90 OH Tukang Batu 74,000 66,600.00
L.03 - OH Kepala Tukang 80,000 -
L.04 0.18 OH Mandor 84,000 15,120.00
B BAHAN 567,820.00
1.200 m3 Batu 210,000 252,000.00
0.520 m3 Pasir Pasang 250,000 130,000.00
163 kg Portland Cement 1,140 185,820.00
C PERALATAN 5,586.00
0.076 hr Molen 73,500 5,586.00
D Jumlah A + B + C 777,526.00
E OVERHEAD & PROFIT (CONTOH) 10% 77,752.60
F Harga Satuan Pekerjaan (D+E) 855,278.60

64 P.01.d.2 1 m3 MORTAR TIPE O 829,516.60


(Mutu PP tertentu setara dg campuran 1PP : 5PP)
A TENAGA 204,120.00
L.01 1.80 OH Pekerja 68,000 122,400.00
L.02 0.90 OH Tukang Batu 74,000 66,600.00
L.03 - OH Kepala Tukang 80,000 -
L.04 0.18 OH Mandor 84,000 15,120.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8= 4 X 7
B BAHAN 544,400.00
1.200 m3 Batu 210,000 252,000.00
0.554 m3 Pasir Pasang 250,000 138,500.00
135 kg Portland Cement 1,140 153,900.00
C PERALATAN 5,586.00
0.076 hr Molen 73,500 5,586.00
D Jumlah A + B + C 754,106.00
E OVERHEAD & PROFIT (CONTOH) 10% 75,410.60
F Harga Satuan Pekerjaan (D+E) 829,516.60

65 P.01.e.1 1 m3 BONGKAR PASANGAN BATU & PEMBERSIHAN BATU (MANUAL) 143,440.00


A TENAGA 128,800.00
L.01 1.40 OH Pekerja 68,000 95,200.00
L.04 0.40 OH Mandor 84,000 33,600.00
B BAHAN -
C PERALATAN 1,600.00
0.008 bh Palu Godam 200,000 1,600.00
0.012 bh Pahat Beton 20,000 240.00
0.020 bh Linggis 150,000 3,000.00
D Jumlah A + B + C 130,400.00
E OVERHEAD & PROFIT (CONTOH) 10% 13,040.00
F Harga Satuan Pekerjaan (D+E) 143,440.00

66 P.01.e.2 1 m3 BONGKAR PASANGAN BATU (MANUAL) 100,881.00


A TENAGA 91,680.00
L.01 1.20 OH Pekerja 68,000 81,600.00
L.04 0.12 OH Mandor 84,000 10,080.00
B BAHAN -
C PERALATAN 30.00
0.006 bh Palu Godam 5,000 30.00
0.009 bh Pahat Beton 5,000 45.00
0.020 bh Linggis 5,000 100.00
D Jumlah A + B + C 91,710.00
E OVERHEAD & PROFIT (CONTOH) 10% 9,171.00
F Harga Satuan Pekerjaan (D+E) 100,881.00

67 P.01.e.3 1 m3 BONGKAR PASANGAN BATU dengan JACK HAMMER 51,414.00


A TENAGA 45,840.00
L.01 0.60 OH Pekerja 68,000 40,800.00
L.04 0.06 OH Mandor 84,000 5,040.00
B BAHAN -
C PERALATAN 900.00
0.050 hr Jack Hammer 18,000 900.00
D Jumlah A + B + C 46,740.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,674.00
F Harga Satuan Pekerjaan (D+E) 51,414.00

68 P.01.e.4 1 m3 PEMBERSIHAN BONGKARAN PASANGAN BATU 16,841.00


UNT DIMANFAATKAN KEMBALI
A TENAGA 15,280.00
L.01 0.20 OH Pekerja 68,000 13,600.00
L.04 0.02 OH Mandor 84,000 1,680.00
B BAHAN -
C PERALATAN 30.00
0.006 bh Palu Godam 5,000 30.00
0.009 bh Pahat Beton 5,000 45.00
-
D Jumlah A + B + C 15,310.00
E OVERHEAD & PROFIT (CONTOH) 10% 1,531.00
F Harga Satuan Pekerjaan (D+E) 16,841.00

JADI BATU SIAP PAKAI DARI 1 M3 MENJADI 0,60 - 0,65 M3


HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8= 4 X 7
A.2 PEKERJAAN PASANGAN
P.02 PASANGAN BATA MERAH
69 P.02.b.1 1 m3 MORTAR TIPE S 1,020,899.00
(Mutu PP tertentu setara dg campuran 1PP : 3PP)
A TENAGA 291,360.00
L.01 2.40 OH Pekerja 68,000 163,200.00
L.02 1.20 OH Tukang Batu 74,000 88,800.00
L.03 0.24 OH Kepala Tukang 80,000 19,200.00
L.04 0.24 OH Mandor 84,000 20,160.00
B BAHAN 636,730.00
500 bh Bata Merah 800 400,000.00
0.345 m3 Pasir Pasang 250,000 86,250.00
132 kg Portland Cement 1,140 150,480.00
C PERALATAN -
-
D Jumlah A + B + C 928,090.00
E OVERHEAD & PROFIT (CONTOH) 10% 92,809.00
F Harga Satuan Pekerjaan (D+E) 1,020,899.00

70 P.02.c.2 1 m3 MORTAR TIPE N 974,677.00


(Mutu PP tertentu setara dg campuran 1PP : 4PP)
A TENAGA 272,160.00
L.01 2.40 OH Pekerja 68,000 163,200.00
L.02 1.20 OH Tukang Batu 74,000 88,800.00
L.03 - OH Kepala Tukang 80,000 -
L.04 0.24 OH Mandor 84,000 20,160.00
B BAHAN 613,910.00
500 bh Bata Merah 800 400,000.00
0.370 m3 Pasir Pasang 250,000 92,500.00
106.50 kg Portland Cement 1,140 121,410.00
C PERALATAN -
-
D Jumlah A + B + C 886,070.00
E OVERHEAD & PROFIT (CONTOH) 10% 88,607.00
F Harga Satuan Pekerjaan (D+E) 974,677.00

71 P.02.d.1 1 m3 MORTAR TIPE O 963,732.00


(Mutu PP tertentu setara dg campuran 1PP : 5PP)
A TENAGA 272,160.00
L.01 2.40 OH Pekerja 68,000 163,200.00
L.02 1.20 OH Tukang Batu 74,000 88,800.00
L.03 OH Kepala Tukang 80,000 -
L.04 0.24 OH Mandor 84,000 20,160.00
B BAHAN 603,960.00
500 bh Bata Merah 800 400,000.00
0.41 m3 Pasir Pasang 250,000 102,500.00
89 kg Portland Cement 1,140 101,460.00
C PERALATAN -
-
D Jumlah A + B + C 876,120.00
E OVERHEAD & PROFIT (CONTOH) 10% 87,612.00
F Harga Satuan Pekerjaan (D+E) 963,732.00

72 P.02.e.1 1 m3 MORTAR campuran 1PP : 6PP 968,176.00


A TENAGA 272,160.00
L.01 2.40 OH Pekerja 68,000 163,200.00
L.02 1.20 OH Tukang Batu 74,000 88,800.00
L.03 OH Kepala Tukang 80,000 -
L.04 0.24 OH Mandor 84,000 20,160.00
B BAHAN 608,000.00
500 bh Bata Merah 800 400,000.00
0.490 m3 Pasir Pasang 250,000 122,500.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8= 4 X 7
75 kg Portland Cement 1,140 85,500.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8= 4 X 7
C PERALATAN -
-
D Jumlah A + B + C 880,160.00
E OVERHEAD & PROFIT (CONTOH) 10% 88,016.00
F Harga Satuan Pekerjaan (D+E) 968,176.00

73 P.02.f.1 1 m3 BONGKAR PASANGAN BATA MERAH (MANUAL) 50,435.00


A TENAGA 45,840.00
L.01 0.60 OH Pekerja 68,000 40,800.00
L.04 0.06 OH Mandor 84,000 5,040.00
B BAHAN -
C PERALATAN 10.00
0.002 bh Palu Godam 5,000 10.00
0.003 bh Pahat Beton 5,000 15.00
0.007 bh Linggis 5,000 35.00
D Jumlah A + B + C 45,850.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,585.00
F Harga Satuan Pekerjaan (D+E) 50,435.00

74 P.02.f.2 1 m3 BONGKAR PASANGAN BATA MERAH dengan JACK HAMMER 17,204.00


A TENAGA 15,280.00
L.01 0.20 OH Pekerja 68,000 13,600.00
L.04 0.02 OH Mandor 84,000 1,680.00
B BAHAN -
C PERALATAN 360.00
0.020 hr Jack Hammer 18,000 360.00
D Jumlah A + B + C 15,640.00
E OVERHEAD & PROFIT (CONTOH) 10% 1,564.00
F Harga Satuan Pekerjaan (D+E) 17,204.00

P.03 PEKERJAAN SIARAN DG MORTAR JENIS PC-PP


75 P.03.a 1 m2 SIARAN DG MORTAR JENIS PC-PP TYPE M 49,992.36
(campuran 1PC : 2PP)
A TENAGA 35,220.00
L.01 0.300 OH Pekerja 68,000 20,400.00
L.02 0.150 OH Tukang Batu 74,000 11,100.00
L.03 0.015 OH Kepala Tukang 80,000 1,200.00
L.04 0.030 OH Mandor 84,000 2,520.00
B BAHAN 10,227.60
0.012 m3 Pasir Pasang 250,000 3,000.00
6.340 kg Portland Cement 1,140 7,227.60
C PERALATAN -
-
D Jumlah A + B + C 45,447.60
E OVERHEAD & PROFIT (CONTOH) 10% 4,544.76
F Harga Satuan Pekerjaan (D+E) 49,992.36

76 P.03.b 1 m2 SIARAN DG MORTAR JENIS PC-PP TYPE S 49,761.36


(campuran 1PC : 3PP)
A TENAGA 35,220.00
L.01 0.3000 OH Pekerja 68,000 20,400.00
L.02 0.1500 OH Tukang Batu 74,000 11,100.00
L.03 0.0150 OH Kepala Tukang 80,000 1,200.00
L.04 0.0300 OH Mandor 84,000 2,520.00
B BAHAN 10,017.60
0.018 m3 Pasir Pasang 250,000 4,500.00
4.840 kg Portland Cement 1,140 5,517.60
C PERALATAN -
-
D Jumlah A + B + C 45,237.60
E OVERHEAD & PROFIT (CONTOH) 10% 4,523.76
F Harga Satuan Pekerjaan (D+E) 49,761.36
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8= 4 X 7
P.04 PEKERJAAN PLESTERAN DG MORTAR JENIS PC-PP
77 P.04.a 1 m2 TRASRAAM TEBAL 1 cm, 51,670.96
DG MORTAR JENIS PC-PP TYPE M (campuran 1PC : 2PP)
A TENAGA 35,220.00
L.01 0.300 OH Pekerja 68,000 20,400.00
L.02 0.150 OH Tukang Batu 74,000 11,100.00
L.03 0.015 OH Kepala Tukang 80,000 1,200.00
L.04 0.030 OH Mandor 84,000 2,520.00
B BAHAN 11,753.60
0.014 m3 Pasir Pasang 250,000 3,500.00
7.240 kg Portland Cement 1,140 8,253.60
C PERALATAN -
D Jumlah A + B + C 46,973.60
E OVERHEAD & PROFIT (CONTOH) 10% 4,697.36
F Harga Satuan Pekerjaan (D+E) 51,670.96

78 P.04.b 1 m2 PLESTERAN TEBAL 1 cm, 50,465.36


DG MORTAR JENIS PC-PP TYPE S (campuran 1PC : 3PP)
A TENAGA 35,220.00
L.01 0.3000 OH Pekerja 68,000 20,400.00
L.02 0.1500 OH Tukang Batu 74,000 11,100.00
L.03 0.0150 OH Kepala Tukang 80,000 1,200.00
L.04 0.0300 OH Mandor 84,000 2,520.00
B BAHAN 10,657.60
0.016 m3 Pasir Pasang 250,000 4,000.00
5.840 kg Portland Cement 1,140 6,657.60
C PERALATAN -
-
D Jumlah A + B + C 45,877.60
E OVERHEAD & PROFIT (CONTOH) 10% 4,587.76
F Harga Satuan Pekerjaan (D+E) 50,465.36

79 P.04.c 1 m2 PLESTERAN TEBAL 1 cm, 49,272.30


DG MORTAR JENIS PC-PP TYPE N (campuran 1PC : 4PP)
A TENAGA 35,220.00
L.01 0.3000 OH Pekerja 68,000 20,400.00
L.02 0.1500 OH Tukang Batu 74,000 11,100.00
L.03 0.0150 OH Kepala Tukang 80,000 1,200.00
L.04 0.0300 OH Mandor 84,000 2,520.00
B BAHAN 9,573.00
0.018 m3 Pasir Pasang 250,000 4,500.00
4.450 kg Portland Cement 1,140 5,073.00
C PERALATAN -
-
D Jumlah A + B + C 44,793.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,479.30
F Harga Satuan Pekerjaan (D+E) 49,272.30

80 P.04.d 1 m2 TRASRAAM TEBAL 1,5 cm, 66,100.50


DG MORTAR JENIS PC-PP TYPE M (campuran 1PC : 2PP)
A TENAGA 43,436.00
L.01 0.384 OH Pekerja 68,000 26,112.00
L.02 0.192 OH Tukang Batu 74,000 14,208.00
L.03 0.019 OH Kepala Tukang 80,000 1,520.00
L.04 0.019 OH Mandor 84,000 1,596.00
B BAHAN 16,655.36
0.020 m3 Pasir Pasang 250,000 5,000.00
10.224 kg Portland Cement 1,140 11,655.36
C PERALATAN -
-
D Jumlah A + B + C 60,091.36
E OVERHEAD & PROFIT (CONTOH) 10% 6,009.14
F Harga Satuan Pekerjaan (D+E) 66,100.50
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 8= 4 X 7
81 P.04.e 1 m2 PLESTERAN TEBAL 1,5 cm, 65,780.70
DG MORTAR JENIS PC-PP TYPE S (campuran 1PC : 3PP)
A TENAGA 43,436.00
L.01 0.3840 OH Pekerja 68,000 26,112.00
L.02 0.1920 OH Tukang Batu 74,000 14,208.00
L.03 0.0190 OH Kepala Tukang 80,000 1,520.00
L.04 0.0190 OH Mandor 84,000 1,596.00
B BAHAN 16,364.64
0.030 m3 Pasir Pasang 250,000 7,500.00
7.776 kg Portland Cement 1,140 8,864.64
C PERALATAN -
-
D Jumlah A + B + C 59,800.64
E OVERHEAD & PROFIT (CONTOH) 10% 5,980.06
F Harga Satuan Pekerjaan (D+E) 65,780.70

82 P.04.f 1 m2 PLESTERAN TEBAL 1,5 cm, 62,254.72


DG MORTAR JENIS PC-PP TYPE N (campuran 1PC : 4PP)
A TENAGA 43,436.00
L.01 0.3840 OH Pekerja 68,000 26,112.00
L.02 0.1920 OH Tukang Batu 74,000 14,208.00
L.03 0.0190 OH Kepala Tukang 80,000 1,520.00
L.04 0.0190 OH Mandor 84,000 1,596.00
B BAHAN 13,159.20
0.024 m3 Pasir Pasang 250,000 6,000.00
6.280 kg Portland Cement 1,140 7,159.20
C PERALATAN -
-
D Jumlah A + B + C 56,595.20
E OVERHEAD & PROFIT (CONTOH) 10% 5,659.52
F Harga Satuan Pekerjaan (D+E) 62,254.72

83 P.05 1 m3 PASANGAN BATU KOSONG 406,340.00


A TENAGA 117,400.00
L.01 1.00 OH Pekerja 68,000 68,000.00
L.02 0.50 OH Tukang Batu 74,000 37,000.00
L.03 0.05 OH Kepala Tukang 80,000 4,000.00
L.04 0.10 OH Mandor 84,000 8,400.00
B BAHAN 252,000.00
1.200 m3 Batu 210,000 252,000.00
-
C PERALATAN -
-
D Jumlah A + B + C 369,400.00
E OVERHEAD & PROFIT (CONTOH) 10% 36,940.00
F Harga Satuan Pekerjaan (D+E) 406,340.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

P.06 PASANGAN BATU BRONJONG KAWAT (SNI 03-0009-1999)


P.06.a PASANGAN BATU BRONJONG KAWAT BENTUK I
P.06.a.1 Bentuk I, tipe A Bronjong kawat
Uk.L=2.0mxB=1.0mxT=1.0m berisi Batu (buat sendiri)
84 a) 2 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,357,560.60
Uk.2,70 mm, kwat sisi 3,40 mm dan Kawat
pengikat 2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 214,946.00
L.01 1.635 OH Pekerja Penganyam 68,000 111,180.00
L.02 0.545 OH Tukang Penganyam 74,000 40,330.00
L.01 0.650 OH Pekerja Pengisi Batu 68,000 44,200.00
L.04 0.229 OH Mandor 84,000 19,236.00
B BAHAN 1,019,200.00
2.60 m3 Batu 225,000 585,000.00
21.71 kg Kawat Bronjong Ø 2,7 mm 20,000 434,200.00
C PERALATAN -
-
D Jumlah A + B + C 1,234,146.00
E OVERHEAD & PROFIT (CONTOH) 10% 123,414.60
F Harga Satuan Pekerjaan (D+E) 1,357,560.60

85 b) 2 m3 Kawat Bronjong galvanis dg kawat anyaman tiga 1,376,707.20


lilitan Uk.3,0 mm, kwat sisi 4,0 mm dan kawat
pengikat 2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 219,452.00
L.01 1.680 OH Pekerja Penganyam 68,000 114,240.00
L.02 0.560 OH Tukang Penganyam 74,000 41,440.00
L.01 0.650 OH Pekerja Pengisi Batu 68,000 44,200.00
L.04 0.233 OH Mandor 84,000 19,572.00
B BAHAN 1,032,100.00
2.60 m3 Batu 225,000 585,000.00
22.355 kg Kawat Bronjong Ø 3 mm 20,000 447,100.00
C PERALATAN -
-
D Jumlah A + B + C 1,251,552.00
E OVERHEAD & PROFIT (CONTOH) 10% 125,155.20
F Harga Satuan Pekerjaan (D+E) 1,376,707.20

86 c) 2 m3 Kawat Bronjong wire mesh 5 mm ulir dan kawat 1,889,063.00


pengikat 2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 369,330.00
L.01 2.865 OH Pekerja Penganyam 68,000 194,820.00
L.02 0.955 OH Tukang Penganyam 74,000 70,670.00
L.01 0.650 OH Pekerja Pengisi Batu 68,000 44,200.00
L.04 0.710 OH Mandor 84,000 59,640.00
B BAHAN 1,348,000.00
2.60 m3 Batu 225,000 585,000.00
38.15 kg Wire mesh 5 mm ulir kotak 10 cm 20,000 763,000.00
C PERALATAN -
-
D Jumlah A + B + C 1,717,330.00
E OVERHEAD & PROFIT (CONTOH) 10% 171,733.00
F Harga Satuan Pekerjaan (D+E) 1,889,063.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7
P.06.a.2 Bentuk I, tipe B Bronjong kawat
Uk.L=3.0m x B=1.0m x T=1.0m berisi Batu (buat sendiri)
87 a) 3 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,432,821.60
Uk.2,70 mm, kwat sisi 3,40 mm dan kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 639,496.00
L.01 4.740 OH Pekerja Penganyam 68,000 322,320.00
L.02 1.580 OH Tukang Penganyam 74,000 116,920.00
L.01 2.100 OH Pekerja Pengisi Batu 68,000 142,800.00
L.04 0.684 OH Mandor 84,000 57,456.00
B BAHAN 1,572,160.00
4.20 m3 Batu 225,000 945,000.00
31.358 kg Kawat Bronjong Ø 2,7 mm 20,000 627,160.00
C PERALATAN -
-
D Jumlah A + B + C 2,211,656.00
E OVERHEAD & PROFIT (CONTOH) 10% 221,165.60
F Harga Satuan Pekerjaan (D+E) 2,432,821.60

88 b) 3 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,027,898.40


Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 320,124.00
L.01 2.430 OH Pekerja Penganyam 68,000 165,240.00
L.02 0.810 OH Tukang Penganyam 74,000 59,940.00
L.01 0.975 OH Pekerja Pengisi Batu 68,000 66,300.00
L.04 0.341 OH Mandor 84,000 28,644.00
B BAHAN 1,523,420.00
3.90 m3 Batu 225,000 877,500.00
32.296 kg Kawat Bronjong Ø 3 mm 20,000 645,920.00
C PERALATAN -
-
D Jumlah A + B + C 1,843,544.00
E OVERHEAD & PROFIT (CONTOH) 10% 184,354.40
F Harga Satuan Pekerjaan (D+E) 2,027,898.40

89 c) 3 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 2,717,979.00


2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 491,390.00
L.01 4.125 OH Pekerja Penganyam 68,000 280,500.00
L.02 1.375 OH Tukang Penganyam 74,000 101,750.00
L.01 0.975 OH Pekerja Pengisi Batu 68,000 66,300.00
L.04 0.510 OH Mandor 84,000 42,840.00
B BAHAN 1,979,500.00
3.90 m3 Batu 225,000 877,500.00
55.10 kg Kawat Bronjong Ø 2,7 mm 20,000 1,102,000.00
C PERALATAN -
-
D Jumlah A + B + C 2,470,890.00
E OVERHEAD & PROFIT (CONTOH) 10% 247,089.00
F Harga Satuan Pekerjaan (D+E) 2,717,979.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7
P.06.a.3 Bentuk I, tipe C Bronjong kawat
Uk.L=4.0m x B=1.0m x T=1.0m berisi Batu (buat sendiri)
90 a) 4 m3 Kawat Bronjong galvanis dg kawat anyaman tiga 2,721,615.60
lilitan Uk.2,70 mm, kwat sisi 3,40 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 403,976.00
L.01 3.090 OH Pekerja Penganyam 68,000 210,120.00
L.02 1.030 OH Tukang Penganyam 74,000 76,220.00
L.01 1.200 OH Pekerja Pengisi Batu 68,000 81,600.00
L.04 0.429 OH Mandor 84,000 36,036.00
B BAHAN 2,070,220.00
5.20 m3 Batu 225,000 1,170,000.00
45.011 kg Kawat Bronjong Ø 2,7 mm 20,000 900,220.00
C PERALATAN -
-
D Jumlah A + B + C 2,474,196.00
E OVERHEAD & PROFIT (CONTOH) 10% 247,419.60
F Harga Satuan Pekerjaan (D+E) 2,721,615.60

91 b) 4 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,716,969.20


Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 455,232.00
L.01 3.800 OH Pekerja Penganyam 68,000 258,400.00
L.02 1.060 OH Tukang Penganyam 74,000 78,440.00
L.01 1.200 OH Pekerja Pengisi Batu 68,000 81,600.00
L.04 0.438 OH Mandor 84,000 36,792.00
B BAHAN 2,014,740.00
5.20 m3 Batu 225,000 1,170,000.00
42.237 kg Kawat Bronjong Ø 3 mm 20,000 844,740.00
C PERALATAN -
-
D Jumlah A + B + C 2,469,972.00
E OVERHEAD & PROFIT (CONTOH) 10% 246,997.20
F Harga Satuan Pekerjaan (D+E) 2,716,969.20

92 c) 4 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat 3,582,788.00


pengikat 2,0mm uk. lobang heksagonal 100x100 mm
A TENAGA 645,080.00
L.01 5.400 OH Pekerja Penganyam 68,000 367,200.00
L.02 1.800 OH Tukang Penganyam 74,000 133,200.00
L.01 1.300 OH Pekerja Pengisi Batu 68,000 88,400.00
L.04 0.670 OH Mandor 84,000 56,280.00
B BAHAN 2,612,000.00
5.20 m3 Batu 225,000 1,170,000.00
72.10 kg Kawat Bronjong Ø 2,7 mm 20,000 1,442,000.00
C PERALATAN -
-
D Jumlah A + B + C 3,257,080.00
E OVERHEAD & PROFIT (CONTOH) 10% 325,708.00
F Harga Satuan Pekerjaan (D+E) 3,582,788.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7
P.06.a.4 Bentuk I, tipe D Bronjong kawat
Uk.L=2.0m x B=1.0m x T=0.5m berisi Batu (buat sendiri)
93 a) 1 m3 Kawat Bronjong galvanis dg kawat anyaman tiga 821,999.20
lilitan Uk.2,70 mm, kwat sisi 3,40 mm & kawat pengikat
2,0mm uk. lobang heksagonal 80 x 100 mm
A TENAGA 152,772.00
L.01 1.140 OH Pekerja Penganyam 68,000 77,520.00
L.02 0.380 OH Tukang Penganyam 74,000 28,120.00
L.01 0.325 OH Pekerja Pengisi Batu 68,000 22,100.00
L.04 0.298 OH Mandor 84,000 25,032.00
B BAHAN 594,500.00
1.30 m3 Batu 225,000 292,500.00
15.100 kg Kawat Bronjong Ø 2,7 mm 20,000 302,000.00
C PERALATAN -
-
D Jumlah A + B + C 747,272.00
E OVERHEAD & PROFIT (CONTOH) 10% 74,727.20
F Harga Satuan Pekerjaan (D+E) 821,999.20

94 b) 1 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 835,533.60


Uk.3,0 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 156,056.00
L.01 1.170 OH Pekerja Penganyam 68,000 79,560.00
L.02 0.390 OH Tukang Penganyam 74,000 28,860.00
L.01 0.325 OH Pekerja Pengisi Batu 68,000 22,100.00
L.04 0.304 OH Mandor 84,000 25,536.00
B BAHAN 603,520.00
1.30 m3 Batu 225,000 292,500.00
15.551 kg Kawat Bronjong Ø 3 mm 20,000 311,020.00
C PERALATAN -
-
D Jumlah A + B + C 759,576.00
E OVERHEAD & PROFIT (CONTOH) 10% 75,957.60
F Harga Satuan Pekerjaan (D+E) 835,533.60

95 c) 1 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 1,152,892.40


2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 224,984.00
L.01 1.980 OH Pekerja Penganyam 68,000 134,640.00
L.02 0.660 OH Tukang Penganyam 74,000 48,840.00
L.01 0.325 OH Pekerja Pengisi Batu 68,000 22,100.00
L.04 0.231 OH Mandor 84,000 19,404.00
B BAHAN 823,100.00
1.30 m3 Batu 225,000 292,500.00
26.53 kg Kawat Bronjong Ø 2,7 mm 20,000 530,600.00
C PERALATAN -
-
D Jumlah A + B + C 1,048,084.00
E OVERHEAD & PROFIT (CONTOH) 10% 104,808.40
F Harga Satuan Pekerjaan (D+E) 1,152,892.40
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7
P.06.a.5 Bentuk I, tipe E Bronjong kawat
Uk.L=3.0m x B=1.0m x T=0.5m berisi Batu (buat sendiri)
96 a) 1.5 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,191,678.40
Uk.2,70 mm, kwat sisi 3,40 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 204,854.00
L.01 1.655 OH Pekerja Penganyam 68,000 112,540.00
L.02 0.555 OH Tukang Penganyam 74,000 41,070.00
L.01 0.488 OH Pekerja Pengisi Batu 68,000 33,184.00
L.04 0.215 OH Mandor 84,000 18,060.00
B BAHAN 878,490.00
1.95 m3 Batu 225,000 438,750.00
21.987 kg Kawat Bronjong Ø 2,7 mm 20,000 439,740.00
C PERALATAN -
-
D Jumlah A + B + C 1,083,344.00
E OVERHEAD & PROFIT (CONTOH) 10% 108,334.40
F Harga Satuan Pekerjaan (D+E) 1,191,678.40

97 b) 1.5 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,445,543.00


Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 422,500.00
L.01 3.390 OH Pekerja Penganyam 68,000 230,520.00
L.02 1.130 OH Tukang Penganyam 74,000 83,620.00
L.01 1.050 OH Pekerja Pengisi Batu 68,000 71,400.00
L.04 0.440 OH Mandor 84,000 36,960.00
B BAHAN 891,630.00
1.95 m3 Batu 225,000 438,750.00
22.644 kg Kawat Bronjong Ø 3 mm 20,000 452,880.00
C PERALATAN -
-
D Jumlah A + B + C 1,314,130.00
E OVERHEAD & PROFIT (CONTOH) 10% 131,413.00
F Harga Satuan Pekerjaan (D+E) 1,445,543.00

98 c) 1.5 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 2,004,167.00
2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 610,820.00
L.01 5.250 OH Pekerja Penganyam 68,000 357,000.00
L.02 1.750 OH Tukang Penganyam 74,000 129,500.00
L.01 1.050 OH Pekerja Pengisi Batu 68,000 71,400.00
L.04 0.630 OH Mandor 84,000 52,920.00
B BAHAN 1,211,150.00
1.95 m3 Batu 225,000 438,750.00
38.62 kg Kawat Bronjong Ø 2,7 mm 20,000 772,400.00
C PERALATAN -
-
D Jumlah A + B + C 1,821,970.00
E OVERHEAD & PROFIT (CONTOH) 10% 182,197.00
F Harga Satuan Pekerjaan (D+E) 2,004,167.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7
P.06.a.6 Bentuk I, tipe F Bronjong kawat
Uk.L=4.0m x B=1.0m x T=0.5m berisi Batu (buat sendiri)
99 a) 2 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,575,035.00
Uk.2,70 mm, kwat sisi 3,40 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 269,690.00
L.01 2.175 OH Pekerja Penganyam 68,000 147,900.00
L.02 0.725 OH Tukang Penganyam 74,000 53,650.00
L.01 0.650 OH Pekerja Pengisi Batu 68,000 44,200.00
L.04 0.285 OH Mandor 84,000 23,940.00
B BAHAN 1,162,160.00
2.60 m3 Batu 225,000 585,000.00
28.858 kg Kawat Bronjong Ø 2,7 mm 20,000 577,160.00
C PERALATAN -
-
D Jumlah A + B + C 1,431,850.00
E OVERHEAD & PROFIT (CONTOH) 10% 143,185.00
F Harga Satuan Pekerjaan (D+E) 1,575,035.00

100 b) 2 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,600,506.60


Uk.3,0 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 275,586.00
L.01 2.235 OH Pekerja Penganyam 68,000 151,980.00
L.02 0.745 OH Tukang Penganyam 74,000 55,130.00
L.01 0.650 OH Pekerja Pengisi Batu 68,000 44,200.00
L.04 0.289 OH Mandor 84,000 24,276.00
B BAHAN 1,179,420.00
2.60 m3 Batu 225,000 585,000.00
29.721 kg Kawat Bronjong Ø 3 mm 20,000 594,420.00
C PERALATAN -
-
D Jumlah A + B + C 1,455,006.00
E OVERHEAD & PROFIT (CONTOH) 10% 145,500.60
F Harga Satuan Pekerjaan (D+E) 1,600,506.60

101 c) 2 m3 Kawat Bronjong wire mesh 5 mm ulir&kawat pengikat 2,192,927.00


2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 394,170.00
L.01 3.405 OH Pekerja Penganyam 68,000 231,540.00
L.02 1.135 OH Tukang Penganyam 74,000 83,990.00
L.01 0.650 OH Pekerja Pengisi Batu 68,000 44,200.00
L.04 0.410 OH Mandor 84,000 34,440.00
B BAHAN 1,599,400.00
2.60 m3 Batu 225,000 585,000.00
50.72 kg Kawat Bronjong Ø 2,7 mm 20,000 1,014,400.00
C PERALATAN -
-
D Jumlah A + B + C 1,993,570.00
E OVERHEAD & PROFIT (CONTOH) 10% 199,357.00
F Harga Satuan Pekerjaan (D+E) 2,192,927.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7
102 P.06.a.7 1 m3 Pasangan bronjong pabrikasi (tenaga kerja untuk 1m3 batu bronjong) 727,760.00
A TENAGA 19,100.00
L.01 0.250 OH Pekerja 68,000 17,000.00
L.04 0.025 OH Mandor 84,000 2,100.00
B BAHAN 642,500.00
1.30 m3 Batu 225,000 292,500.00
1.00 bh Kawat Bronjong Pabrikasi dia,2.7 350,000 350,000.00
C PERALATAN -
-
D Jumlah A + B + C 661,600.00
E OVERHEAD & PROFIT (CONTOH) 10% 66,160.00
F Harga Satuan Pekerjaan (D+E) 727,760.00

P.06 PASANGAN BATU BRONJONG KAWAT (SNI 03-0009-1999)


P.06.b PASANGAN BATU BRONJONG KAWAT BENTUK II
P.06.b.1 Bentuk II, tipe G Bronjong kawat
Uk.L=6.0mxB=2.0mxT=0.17m berisi Batu (buat sendiri)
103 a) 2.04 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,498,535.60
Uk.2,00 mm, kwat sisi 3,40 mm & Kawat pengikat
2,0mm, ukuran lobang heksagonal 60 x 80 mm
A TENAGA 882,276.00
L.01 7.650 OH Pekerja Penganyam 68,000 520,200.00
L.02 2.550 OH Tukang Penganyam 74,000 188,700.00
L.01 1.428 OH Pekerja Pengisi Batu 68,000 97,104.00
L.04 0.908 OH Mandor 84,000 76,272.00
B BAHAN 1,389,120.00
2.856 m3 Batu 225,000 642,600.00
37.326 kg Kawat Bronjong Ø 2,0 mm 20,000 746,520.00
C PERALATAN -
-
D Jumlah A + B + C 2,271,396.00
E OVERHEAD & PROFIT (CONTOH) 10% 227,139.60
F Harga Satuan Pekerjaan (D+E) 2,498,535.60

104 b) 2.04 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,177,568.80
Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 368,988.00
L.01 3.150 OH Pekerja Penganyam 68,000 214,200.00
L.02 1.050 OH Tukang Penganyam 74,000 77,700.00
L.01 0.663 OH Pekerja Pengisi Batu 68,000 45,084.00
L.04 0.381 OH Mandor 84,000 32,004.00
B BAHAN 1,610,620.00
2.652 m3 Batu 225,000 596,700.00
50.696 kg Kawat Bronjong Ø 2,7 mm 20,000 1,013,920.00
C PERALATAN -
-
D Jumlah A + B + C 1,979,608.00
E OVERHEAD & PROFIT (CONTOH) 10% 197,960.80
F Harga Satuan Pekerjaan (D+E) 2,177,568.80
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7
P.06.b.2 Bentuk II, tipe H Bronjong kawat
Uk.L=6.0m x B=2.0m x T=0.23m berisi Batu (buat sendiri)
105 a) 2.76 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,274,188.40
Uk.2,00 mm, kwat sisi 3,40 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 60 x 80 mm
A TENAGA 474,844.00
L.01 4.020 OH Pekerja Penganyam 68,000 273,360.00
L.02 1.340 OH Tukang Penganyam 74,000 99,160.00
L.01 0.897 OH Pekerja Pengisi Batu 68,000 60,996.00
L.04 0.492 OH Mandor 84,000 41,328.00
B BAHAN 1,592,600.00
3.588 m3 Batu 225,000 807,300.00
39.265 kg Kawat Bronjong Ø 2,0 mm 20,000 785,300.00
C PERALATAN -
-
D Jumlah A + B + C 2,067,444.00
E OVERHEAD & PROFIT (CONTOH) 10% 206,744.40
F Harga Satuan Pekerjaan (D+E) 2,274,188.40

106 b) 2.76 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,536,903.60
Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 432,396.00
L.01 3.600 OH Pekerja Penganyam 68,000 244,800.00
L.02 1.200 OH Tukang Penganyam 74,000 88,800.00
L.01 0.897 OH Pekerja Pengisi Batu 68,000 60,996.00
L.04 0.450 OH Mandor 84,000 37,800.00
B BAHAN 1,873,880.00
3.588 m3 Batu 225,000 807,300.00
53.329 kg Kawat Bronjong Ø 2,7 mm 20,000 1,066,580.00
C PERALATAN -
-
D Jumlah A + B + C 2,306,276.00
E OVERHEAD & PROFIT (CONTOH) 10% 230,627.60
F Harga Satuan Pekerjaan (D+E) 2,536,903.60

P.06.b.3 Bentuk II, tipe I Bronjong kawat


Uk.L=6.0m x B=2.0m x T=0,30m berisi Batu (buat sendiri)
107 a) 3.6 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,643,665.20
Uk.2,00 mm, kwat sisi 3,40 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 60 x 80 mm
A TENAGA 519,932.00
L.01 4.260 OH Pekerja Penganyam 68,000 289,680.00
L.02 1.420 OH Tukang Penganyam 74,000 105,080.00
L.01 1.170 OH Pekerja Pengisi Batu 68,000 79,560.00
L.04 0.543 OH Mandor 84,000 45,612.00
B BAHAN 1,883,400.00
4.68 m3 Batu 225,000 1,053,000.00
41.520 kg Kawat Bronjong Ø 2,7 mm 20,000 830,400.00
C PERALATAN -
-
D Jumlah A + B + C 2,403,332.00
E OVERHEAD & PROFIT (CONTOH) 10% 240,333.20
F Harga Satuan Pekerjaan (D+E) 2,643,665.20
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7
108 b) 3.6 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 3,197,642.80
Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 726,108.00
L.01 6.300 OH Pekerja Penganyam 68,000 428,400.00
L.02 2.100 OH Tukang Penganyam 74,000 155,400.00
L.01 1.170 OH Pekerja Pengisi Batu 68,000 79,560.00
L.04 0.747 OH Mandor 84,000 62,748.00
B BAHAN 2,180,840.00
4.68 m3 Batu 225,000 1,053,000.00
56.392 kg Kawat Bronjong Ø 2,7 mm 20,000 1,127,840.00
C PERALATAN -
-
D Jumlah A + B + C 2,906,948.00
E OVERHEAD & PROFIT (CONTOH) 10% 290,694.80
F Harga Satuan Pekerjaan (D+E) 3,197,642.80

109 P.06.b.4) 1 m3 Pasangan bronjong pabrikasi (tenaga kerja untuk 1m3 batu 786,962.00
bronjong)
A TENAGA 22,920.00
L.01 0.300 OH Pekerja 68,000 20,400.00
L.04 0.030 OH Mandor 84,000 2,520.00
B BAHAN 692,500.00
1.30 m3 Batu 225,000 292,500.00
1.00 bh Kawat Bronjong Pabrikasi dia,3,0 400,000 400,000.00
C PERALATAN -
-
D Jumlah A + B + C 715,420.00
E OVERHEAD & PROFIT (CONTOH) 10% 71,542.00
F Harga Satuan Pekerjaan (D+E) 786,962.00

P.07. Cerucuk dan Pemasangan Modul Bronjong


110 a) 1 m3 Panjang Cerucuk Kayu / Dolken Ø 8 - 10 cm 26,531.18
A TENAGA 11,888.00
L.01 0.120 OH Pekerja 68,000 8,160.00
L.04 0.012 OH Mandor 84,000 1,008.00
L.05 0.040 OH Operator Tripod / Crane 68,000 2,720.00
B BAHAN 2,231.25
1.05 m' Kayu Galam/Dolken Ø 8 - 10 cm 2,125 2,231.25
C PERALATAN 10,000.00
0.040 hr Tripod Tinggi 5 m' 150,000 6,000.00
0.040 hr Alat Pancang Hammer 0,5 ton 100,000 4,000.00
- hr Alat Penyambung Tiang Pancang Dolken 50,000 -
D Jumlah A + B + C 24,119.25
E OVERHEAD & PROFIT (CONTOH) 10% 2,411.93
F Harga Satuan Pekerjaan (D+E) 26,531.18

111 b) 1 m' Panjang Cerucuk Bambu Ø 8 - 10 cm 27,902.74


A TENAGA 11,888.00
L.01 0.120 OH Pekerja 68,000 8,160.00
L.04 0.012 OH Mandor 84,000 1,008.00
L.05 0.040 OH Operator Tripod / Crane 68,000 2,720.00
B BAHAN 3,478.13
1.05 m' Bambu 3,313 3,478.13
C PERALATAN 10,000.00
0.040 hr Tripod Tinggi 5 m' 150,000 6,000.00
0.040 hr Alat Pancang Hammer 0,5 ton 100,000 4,000.00
0.000 hr Alat Penyambung Tiang Pancang Dolken 50,000 -
D Jumlah A + B + C 25,366.13
E OVERHEAD & PROFIT (CONTOH) 10% 2,536.61
F Harga Satuan Pekerjaan (D+E) 27,902.74
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

112 c) 1 m' Panjang Cerucuk Tiang Beton Ø 10 - 15 cm 118,243.40


A TENAGA 14,860.00
L.01 0.150 OH Pekerja 68,000 10,200.00
L.04 0.015 OH Mandor 84,000 1,260.00
L.05 0.050 OH Operator Tripod / Crane 68,000 3,400.00
B BAHAN 80,134.00
1.03 m' Tiang Beton Ø 10 - 15 cm 77,800.00 80,134.00
C PERALATAN 12,500.00
0.050 hr Tripod Tinggi 5 m' 150,000 7,500.00
0.050 hr Alat Pancang Hammer 0,5 ton 100,000 5,000.00
0.000 hr Alat Penyambung Tiang Pancang Dolken 50,000 -
D Jumlah A + B + C 107,494.00
E OVERHEAD & PROFIT (CONTOH) 10% 10,749.40
F Harga Satuan Pekerjaan (D+E) 118,243.40

113 d) 1 m3 Pemasangan Modul Bronjong Kawat menjadi 321,733.50


Struktur Krib Sungai
A TENAGA 14,860.00
L.01 0.150 OH Pekerja 68,000 10,200.00
L.04 0.015 OH Mandor 84,000 1,260.00
L.05 0.050 OH Operator Tripod / Crane 68,000 3,400.00
B BAHAN 273,125.00
1.15 m3 Lapis Ijuk 5 cm (hanya unt bronjong yg menempel tanah) 237,500 273,125.00
C PERALATAN 4,500.00
0.050 hr Crane 90,000 4,500.00
0.000 hr Alat Pancang Hammer 0,5 ton 100,000 -
0.000 hr Alat Penyambung Tiang Pancang Dolken 50,000 -
D Jumlah A + B + C 292,485.00
E OVERHEAD & PROFIT (CONTOH) 10% 29,248.50
F Harga Satuan Pekerjaan (D+E) 321,733.50
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

P.08 PASANGAN BATU MUKA DAN BATU CANDI


114 a) 1 m2 Pasangan Batu Muka 332,730.20
A TENAGA 28,032.00
L.01 0.240 OH Pekerja 68,000 16,320.00
L.02 0.120 OH Tukang Batu 74,000 8,880.00
L.03 0.012 OH Kepala Tukang 68,000 816.00
L.04 0.024 OH Mandor 84,000 2,016.00
B BAHAN 274,450.00
1.250 m3 Batu Muka 210,000 262,500.00
0.025 kg Pasir Pasang 250,000 6,250.00
5.000 kg Portland Cemen 1,140.00 5,700.00
C PERALATAN -
-
D Jumlah A + B + C 302,482.00
E OVERHEAD & PROFIT (CONTOH) 10% 30,248.20
F Harga Satuan Pekerjaan (D+E) 332,730.20

115 b) 1 m2 Pasangan Batu Candi 321,180.20


A TENAGA 28,032.00
L.01 0.240 OH Pekerja 68,000 16,320.00
L.02 0.120 OH Tukang Batu 74,000 8,880.00
L.03 0.012 OH Kepala Tukang 68,000 816.00
L.04 0.024 OH Mandor 84,000 2,016.00
B BAHAN 263,950.00
1.200 m3 Batu Muka 210,000 252,000.00
0.025 kg Pasir Pasang 250,000 6,250.00
5.000 kg Portland Cemen 1,140.00 5,700.00
C PERALATAN -
-
D Jumlah A + B + C 291,982.00
E OVERHEAD & PROFIT (CONTOH) 10% 29,198.20
F Harga Satuan Pekerjaan (D+E) 321,180.20

P.09 PASANGAN GEOTEKSTIL


116 a) 1 m2 Pemasangan Geotekstil Tipe A 24,799.50
A TENAGA 9,000.00
L.01 0.100 OH Pekerja 68,000 6,800.00
L.02 0.020 OH Tukang Gali 68,000 1,360.00
L.04 0.010 OH Mandor 84,000 840.00
B BAHAN 13,545.00
1.050 m2 Geotekstil 12,900 13,545.00
C PERALATAN -
-
D Jumlah A + B + C 22,545.00
E OVERHEAD & PROFIT (CONTOH) 10% 2,254.50
F Harga Satuan Pekerjaan (D+E) 24,799.50

117 b) 1 m2 Pemasangan Geotekstil Tipe B 31,165.20


A TENAGA 14,400.00
L.01 0.160 OH Pekerja 68,000 10,880.00
L.02 0.032 OH Tukang Gali 68,000 2,176.00
L.04 0.016 OH Mandor 84,000 1,344.00
B BAHAN 13,932.00
1.080 m2 Geotekstil 12,900 13,932.00
C PERALATAN -
-
D Jumlah A + B + C 28,332.00
E OVERHEAD & PROFIT (CONTOH) 10% 2,833.20
F Harga Satuan Pekerjaan (D+E) 31,165.20
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

118 c) 1 m2 Pemasangan Geotekstil Tipe C 39,369.00

A TENAGA 21,600.00
L.01 0.240 OH Pekerja 68,000 16,320.00

L.02 0.048 OH Tukang Gali 68,000 3,264.00

L.04 0.024 OH Mandor 84,000 2,016.00

B BAHAN 14,190.00

1.100 m2 Geotekstil 12,900 14,190.00

C PERALATAN -
-

D Jumlah A + B + C 35,790.00

E OVERHEAD & PROFIT (CONTOH) 10% 3,579.00

F Harga Satuan Pekerjaan (D+E) 39,369.00

PASANGAN BAR SCREEN (SARINGAN KASAR)

BANGUNAN INTAKE, PENGUKUR & PENGATUR


119 P.10 1 bh PASANGAN BAR SCREEN / SARINGAN KASAR 463,375.00

A TENAGA 77,500.00

L.01 0.750 OH Pekerja 68,000 51,000.00

L.02 0.250 OH Tukang Batu 74,000 18,500.00

L.03 0.025 OH Kepala Tukang Batu 68,000 1,700.00

L.04 0.075 OH Mandor 84,000 6,300.00


B BAHAN 333,800.00

30.000 m' Besi Beton Ø 12 mm 7,900.00 237,000.00

4.000 m' Besi Profil L.40.40.4 24,200 96,800.00

C PERALATAN 9,950.00

0.150 hr Alat Las 65,000 9,750.00

0.020 hr Bor Listrik 10,000 200.00

D Jumlah A + B + C 421,250.00
E OVERHEAD & PROFIT (CONTOH) 10% 42,125.00

F Harga Satuan Pekerjaan (D+E) 463,375.00

BANGUNAN PENGUKUR DAPAT TERBUAT DARI BETON

ATAU PASANGAN BATU KALI DIPLESTER / BATU MUKA

YANG DILENGKAPI ALAT AMBANG UKUR, AMBANG UKUR


DARI BAJA PROFIL L.40.40.4&PEMASANGAN PAKAI RAAM SET
120 P.11 1 bh PASANGAN AMBANG UKUR PADA BANGUNAN 11,692,872.40
PENGUKUR DAN/ATAU PENGATUR
A TENAGA 29,234.00
L.01 0.250 OH Pekerja 68,000 17,000.00
L.02 0.125 OH Tukang Batu 74,000 9,250.00
L.03 0.013 OH Kepala Tukang Batu 68,000 884.00
L.04 0.025 OH Mandor 84,000 2,100.00
B BAHAN 10,596,800.00
21.000 bh Dynabolt/raam set Ø 8 mm panj 4 - 5 cm *) 500,000 10,500,000.00
4.000 m' Besi Profil L.40.40.4 *) 24,200 96,800.00
C PERALATAN 3,850.00
0.050 hr Alat Las 65,000 3,250.00
0.060 hr Bor Listrik 10,000 600.00
D Jumlah A + B + C 10,629,884.00
E OVERHEAD & PROFIT (CONTOH) 10% 1,062,988.40
F Harga Satuan Pekerjaan (D+E) 11,692,872.40
*) sesuai dengan spek atau kebutuhan lapangan
harga barang sebagai contoh (silahkan disesuaikan)
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

P.12 PASANGAN LEMPENG RUMPUT


121 a) 1 m2 Penanaman Rumput Lempengan 27,098.50
A TENAGA 7,640.00
L.01 0.100 OH Pekerja 68,000 6,800.00
L.04 0.010 OH Mandor 84,000 840.00
B BAHAN 16,995.00
1.100 m2 Gebalan Rumput 15,450 16,995.00
C PERALATAN -
-
D Jumlah A + B + C 24,635.00
E OVERHEAD & PROFIT (CONTOH) 10% 2,463.50
F Harga Satuan Pekerjaan (D+E) 27,098.50

122 b) 1 m2 Pembabadan Rumput 1,666.50


A TENAGA 955.00
L.01 0.0125 OH Pekerja 68,000 850.00
L.04 0.00125 OH Mandor 84,000 105.00
B BAHAN -
- -
C PERALATAN 560.00
0.007 hr Alat Potong Rumput 80,000 560.00
D Jumlah A + B + C 1,515.00
E OVERHEAD & PROFIT (CONTOH) 10% 151.50
F Harga Satuan Pekerjaan (D+E) 1,666.50

P.13 PEKERJAAN PANTAI


123 a) 1 ph Penanaman Pohon bakau 3,268.32
A TENAGA 611.20
L.01 0.008 OH Pekerja 68,000 544.00
L.04 0.001 OH Mandor 84,000 67.20
B BAHAN 2,000.00
1.000 m3 Bibit Mangrove 1,000 1,000.00
1.000 kg Anjir tinggi 2 m' 1,000 1,000.00
C PERALATAN 360.00
0.002 hr Kendaraan Pengangkut 55,000 110.00
0.005 hr Rakit 50,000 250.00
D Jumlah A + B + C 2,971.20
E OVERHEAD & PROFIT (CONTOH) 10% 297.12
F Harga Satuan Pekerjaan (D+E) 3,268.32

124 b) 1 m2 Matras Bambu 111,320.00


A TENAGA 38,200.00
L.01 0.500 OH Pekerja 68,000 34,000.00
L.04 0.050 OH Mandor 84,000 4,200.00
B BAHAN 58,000.00
4.000 bh Bambu 13,250 53,000.00
5.000 m' Tali Pengikat 1,000 5,000.00
C PERALATAN 5,000.00
Alat Bantu ls 5,000.00
D Jumlah A + B + C 101,200.00
E OVERHEAD & PROFIT (CONTOH) 10% 10,120.00
F Harga Satuan Pekerjaan (D+E) 111,320.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

P.14 PASANGAN GEOTEKSTIL


125 a) 1 m2 Pemasangan Geotekstil Tipe A 24,799.50
A TENAGA 9,000.00
L.01 0.100 OH Pekerja 68,000 6,800.00
L.02 0.020 OH Tukang Gali 68,000 1,360.00
L.04 0.010 OH Mandor 84,000 840.00
B BAHAN 13,545.00
1.050 m2 Geotekstil 12,900 13,545.00
C PERALATAN -
-
D Jumlah A + B + C 22,545.00
E OVERHEAD & PROFIT (CONTOH) 10% 2,254.50
F Harga Satuan Pekerjaan (D+E) 24,799.50

126 b) 1 m2 Pemasangan Geotekstil Tipe B 31,165.20


A TENAGA 14,400.00
L.01 0.160 OH Pekerja 68,000 10,880.00
L.02 0.032 OH Tukang Gali 68,000 2,176.00
L.04 0.016 OH Mandor 84,000 1,344.00
B BAHAN 13,932.00
1.080 m2 Geotekstil 12,900 13,932.00
C PERALATAN -
-
D Jumlah A + B + C 28,332.00
E OVERHEAD & PROFIT (CONTOH) 10% 2,833.20
F Harga Satuan Pekerjaan (D+E) 31,165.20

127 c) 1 m2 Pemasangan Geotekstil Tipe C 39,369.00


A TENAGA 21,600.00
L.01 0.240 OH Pekerja 68,000 16,320.00
L.02 0.048 OH Tukang Gali 68,000 3,264.00
L.04 0.024 OH Mandor 84,000 2,016.00
B BAHAN 14,190.00
1.100 m2 Geotekstil 12,900 14,190.00
C PERALATAN -
-
D Jumlah A + B + C 35,790.00
E OVERHEAD & PROFIT (CONTOH) 10% 3,579.00
F Harga Satuan Pekerjaan (D+E) 39,369.00
PASANGAN BAR SCREEN (SARINGAN KASAR)
BANGUNAN INTAKE, PENGUKUR & PENGATUR
128 P.10 1 bh PASANGAN BAR SCREEN / SARINGAN KASAR 463,375.00
A TENAGA 77,500.00
L.01 0.750 OH Pekerja 68,000 51,000.00
L.02 0.250 OH Tukang Batu 74,000 18,500.00
L.03 0.025 OH Kepala Tukang Batu 68,000 1,700.00
L.04 0.075 OH Mandor 84,000 6,300.00
B BAHAN 333,800.00
30.000 m' Besi Beton Ø 12 mm 7,900 237,000.00
4.000 m' Besi Profil L.40.40.4 24,200 96,800.00
C PERALATAN 9,950.00
0.150 hr Alat Las 65,000 9,750.00
0.020 hr Bor Listrik 10,000 200.00
D Jumlah A + B + C 421,250.00
E OVERHEAD & PROFIT (CONTOH) 10% 42,125.00
F Harga Satuan Pekerjaan (D+E) 463,375.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

BANGUNAN PENGUKUR DAPAT TERBUAT DARI BETON


ATAU PASANGAN BATU KALI DIPLESTER / BATU MUKA
YANG DILENGKAPI ALAT AMBANG UKUR, AMBANG UKUR
DARI BAJA PROFIL L.40.40.4 & PEMASANGAN PAKAI RAAM SET
129 P.11 1 bh PASANGAN AMBANG UKUR PADA 11,690,672.40
BANGUNAN PENGUKUR DAN/ATAU PENGATUR
A TENAGA 29,234.00
L.01 0.250 OH Pekerja 68,000 17,000.00
L.02 0.125 OH Tukang Batu 74,000 9,250.00
L.03 0.013 OH Kepala Tukang Batu 68,000 884.00
L.04 0.025 OH Mandor 84,000 2,100.00
B BAHAN 10,596,800.00
21.000 bh Dynabolt/raam set Ø 8 mm panj 4 - 5 cm *) 500,000 10,500,000.00
4.000 m' Besi Profil L.40.40.4 *) 24,200 96,800.00
C PERALATAN 1,850.00
0.050 hr Alat Las 25,000 1,250.00
0.060 hr Bor Listrik 10,000 600.00
D Jumlah A + B + C 10,627,884.00
E OVERHEAD & PROFIT (CONTOH) 10% 1,062,788.40
F Harga Satuan Pekerjaan (D+E) 11,690,672.40
*) sesuai dengan spek atau kebutuhan lapangan
harga barang sebagai contoh (silahkan disesuaikan)

P.12 PASANGAN LEMPENG RUMPUT


130 a) 1 m2 Penanaman Rumput Lempengan 22,924.00
A TENAGA 7,640.00
L.01 0.100 OH Pekerja 68,000 6,800.00
L.04 0.010 OH Mandor 84,000 840.00
B BAHAN 13,200.00
1.100 m2 Gebalan Rumput 12,000 13,200.00
C PERALATAN -
-
D Jumlah A + B + C 20,840.00
E OVERHEAD & PROFIT (CONTOH) 10% 2,084.00
F Harga Satuan Pekerjaan (D+E) 22,924.00

131 b) 1 m2 Pembabadan Rumput 1,127.50


A TENAGA 955.00
L.01 0.0125 OH Pekerja 68,000 850.00
L.04 0.00125 OH Mandor 84,000 105.00
B BAHAN -
- -
C PERALATAN 70.00
0.007 hr Alat Potong Rumput 10,000 70.00
D Jumlah A + B + C 1,025.00
E OVERHEAD & PROFIT (CONTOH) 10% 102.50
F Harga Satuan Pekerjaan (D+E) 1,127.50
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

B.01 PEKERJAAN BETON


1 1 m3 Beton Untuk Lantai Kerja 879,227.80
A TENAGA 118,888.00
L.01 1.320 OH Pekerja 68,000 89,760.00
L.02 0.220 OH Tukang Batu 74,000 16,280.00
L.03 0.022 OH Kepala Tukang 80,000 1,760.00
L.04 0.132 OH Mandor 84,000 11,088.00
B BAHAN 680,410.00
200 kg PC/Portlan Cement 1,140 228,000.00
0.522 m3 PB/Pasir Beton 330,000 172,260.00
0.862 m3 Kr/Krikil 325,000 280,150.00
- lt Air 4.50 -
C PERALATAN -
-
D Jumlah A + B + C 799,298.00
E OVERHEAD & PROFIT (CONTOH) 10% 79,929.80
F Harga Satuan Pekerjaan (D+E) 879,227.80

2 B.02 1 m3 Beton Mutu f'c=7,4 Mpa (K100), slump (12±2) cm, w/c =0,87 964,290.25
a) Manual
A TENAGA 148,650.00
L.01 1.650 OH Pekerja 68,000 112,200.00
L.02 0.275 OH Tukang Batu 74,000 20,350.00
L.03 0.028 OH Kepala Tukang 80,000 2,240.00
L.04 0.165 OH Mandor 84,000 13,860.00
B BAHAN 727,977.50
247 kg PC/Portlan Cement 1,140 281,580.00
0.621 m3 PB/Pasir Beton 330,000 204,930.00
0.740 m3 Kr/Krikil 325,000 240,500.00
215 lt Air 4.50 967.50
C PERALATAN -
-
D Jumlah A + B + C 876,627.50
E OVERHEAD & PROFIT (CONTOH) 10% 87,662.75
F Harga Satuan Pekerjaan (D+E) 964,290.25

3 B.02 1 m3 Beton Mutu f'c=7,4 Mpa (K100), slump (12±2) cm, w/c =0,87 949,201.55
b) Menggunakan Molen
A TENAGA 116,558.00
L.01 1.323 OH Pekerja 68,000 89,964.00
L.02 0.189 OH Tukang Batu 74,000 13,986.00
L.03 0.019 OH Kepala Tukang 80,000 1,520.00
L.04 0.132 OH Mandor 84,000 11,088.00
B BAHAN 727,977.50
247 kg PC/Portlan Cement 1,140 281,580.00
0.621 m3 PB/Pasir Beton 330,000 204,930.00
0.740 m3 Kr/Krikil 325,000 240,500.00
215 lt Air 4.50 967.50
C PERALATAN 18,375.00
0.25 hr Molen 0,35 m3 73,500 18,375.00
D Jumlah A + B + C 862,910.50
E OVERHEAD & PROFIT (CONTOH) 10% 86,291.05
F Harga Satuan Pekerjaan (D+E) 949,201.55

4 B.03 1 m3 Beton Mutu f'c=9,8 Mpa (K125), slump (12±2) cm, w/c =0,78 993,364.41
a) Manual
A TENAGA 148,650.00
L.01 1.650 OH Pekerja 68,000 112,200.00
L.02 0.275 OH Tukang Batu 74,000 20,350.00
L.03 0.028 OH Kepala Tukang 80,000 2,240.00
L.04 0.165 OH Mandor 84,000 13,860.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

B BAHAN 754,408.56
276 kg PC/Portlan Cement 1,140 314,640.00
828 kg PB/Pasir Beton 236 195,171.43
1,012 kg Kr/Krikil 241 243,629.63
215 lt Air 4.50 967.50
C PERALATAN -
-
D Jumlah A + B + C 903,058.56
E OVERHEAD & PROFIT (CONTOH) 10% 90,305.86
F Harga Satuan Pekerjaan (D+E) 993,364.41

5 B.03 1 m3 Beton Mutu f'c=9,8 Mpa (K125), slump (12±2) cm, w/c =0,78 978,275.71
b) Menggunakan Molen
A TENAGA 116,558.00
L.01 1.323 OH Pekerja 68,000 89,964.00
L.02 0.189 OH Tukang Batu 74,000 13,986.00
L.03 0.019 OH Kepala Tukang 80,000 1,520.00
L.04 0.132 OH Mandor 84,000 11,088.00
B BAHAN 754,408.56
276 kg PC/Portlan Cement 1,140 314,640.00
828 kg PB/Pasir Beton 236 195,171.43
1,012 kg Kr/Krikil 241 243,629.63
215 lt Air 4.50 967.50
C PERALATAN 18,375.00
0.25 hr Molen 0,35 m3 73,500 18,375.00
D Jumlah A + B + C 889,341.56
E OVERHEAD & PROFIT (CONTOH) 10% 88,934.16
F Harga Satuan Pekerjaan (D+E) 978,275.71

6 B.04 1 m3 Beton Mutu f'c=12,2 Mpa (K150), slump (12±2) cm, w/c =0,72 1,016,011.20
a) Manual
A TENAGA 148,650.00
L.01 1.650 OH Pekerja 68,000 112,200.00
L.02 0.275 OH Tukang Batu 74,000 20,350.00
L.03 0.028 OH Kepala Tukang 80,000 2,240.00
L.04 0.165 OH Mandor 84,000 13,860.00
B BAHAN 774,996.55
299 kg PC/Portlan Cement 1,140 340,860.00
799 kg PB/Pasir Beton 236 188,335.71
1,017 kg Kr/Krikil 241 244,833.33
215 lt Air 4.50 967.50
C PERALATAN -
-
D Jumlah A + B + C 923,646.55
E OVERHEAD & PROFIT (CONTOH) 10% 92,364.65
F Harga Satuan Pekerjaan (D+E) 1,016,011.20

7 B.04 1 m3 Beton Mutu f'c=12,2 Mpa (K150), slump (12±2) cm, w/c =0,72 1,000,922.50
b) Menggunakan Molen
A TENAGA 116,558.00
L.01 1.323 OH Pekerja 68,000 89,964.00
L.02 0.189 OH Tukang Batu 74,000 13,986.00
L.03 0.019 OH Kepala Tukang 80,000 1,520.00
L.04 0.132 OH Mandor 84,000 11,088.00
B BAHAN 774,996.55
299 kg PC/Portlan Cement 1,140 340,860.00
799 kg PB/Pasir Beton 236 188,335.71
1,017 kg Kr/Krikil 241 244,833.33
215 lt Air 4.50 967.50
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

C PERALATAN 18,375.00
0.25 hr Molen 0,35 m3 73,500 18,375.00
D Jumlah A + B + C 909,929.55
E OVERHEAD & PROFIT (CONTOH) 10% 90,992.95
F Harga Satuan Pekerjaan (D+E) 1,000,922.50

8 B.05 1 m3 Beton Mutu f'c=14,5 Mpa (K175), slump (12±2) cm, w/c =0,66 1,042,934.84
a) Manual
A TENAGA 148,650.00
L.01 1.650 OH Pekerja 68,000 112,200.00
L.02 0.275 OH Tukang Batu 74,000 20,350.00
L.03 0.028 OH Kepala Tukang 80,000 2,240.00
L.04 0.165 OH Mandor 84,000 13,860.00
B BAHAN 799,472.58
326 kg PC/Portlan Cement 1,140 371,640.00
760 kg PB/Pasir Beton 236 179,142.86
1,029 kg Kr/Krikil 241 247,722.22
215 lt Air 4.50 967.50
C PERALATAN -
-
D Jumlah A + B + C 948,122.58
E OVERHEAD & PROFIT (CONTOH) 10% 94,812.26
F Harga Satuan Pekerjaan (D+E) 1,042,934.84

9 B.05 1 m3 Beton Mutu f'c=14,5 Mpa (K175), slump (12±2) cm, w/c =0,66 1,027,846.14
b) Menggunakan Molen
A TENAGA 116,558.00
L.01 1.323 OH Pekerja 68,000 89,964.00
L.02 0.189 OH Tukang Batu 74,000 13,986.00
L.03 0.019 OH Kepala Tukang 80,000 1,520.00
L.04 0.132 OH Mandor 84,000 11,088.00
B BAHAN 799,472.58
326 kg PC/Portlan Cement 1,140 371,640.00
760 kg PB/Pasir Beton 236 179,142.86
1,029 kg Kr/Krikil 241 247,722.22
215 lt Air 4.50 967.50
C PERALATAN 18,375.00
0.25 hr Molen 0,35 m3 73,500 18,375.00
D Jumlah A + B + C 934,405.58
E OVERHEAD & PROFIT (CONTOH) 10% 93,440.56
F Harga Satuan Pekerjaan (D+E) 1,027,846.14

10 B.06 1 m3 Beton Mutu f'c=16,9 Mpa (K200), slump (12±2) cm, w/c =0,61 1,068,549.18
a) Manual
A TENAGA 148,650.00
L.01 1.650 OH Pekerja 68,000 112,200.00
L.02 0.275 OH Tukang Batu 74,000 20,350.00
L.03 0.028 OH Kepala Tukang 80,000 2,240.00
L.04 0.165 OH Mandor 84,000 13,860.00
B BAHAN 822,758.35
352 kg PC/Portlan Cement 1,140 401,280.00
731 kg PB/Pasir Beton 236 172,307.14
1,031 kg Kr/Krikil 241 248,203.70
215 lt Air 4.50 967.50
C PERALATAN -
-
D Jumlah A + B + C 971,408.35
E OVERHEAD & PROFIT (CONTOH) 10% 97,140.83
F Harga Satuan Pekerjaan (D+E) 1,068,549.18
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

11 B.06 1 m3 Beton Mutu f'c=16,9 Mpa (K200), slump (12±2) cm, w/c =0,61 1,053,460.48
b) Menggunakan Molen
A TENAGA 116,558.00
L.01 1.323 OH Pekerja 68,000 89,964.00
L.02 0.189 OH Tukang Batu 74,000 13,986.00
L.03 0.019 OH Kepala Tukang 80,000 1,520.00
L.04 0.132 OH Mandor 84,000 11,088.00
B BAHAN 822,758.35
352 kg PC/Portlan Cement 1,140 401,280.00
731 kg PB/Pasir Beton 236 172,307.14
1,031 kg Kr/Krikil 241 248,203.70
215 lt Air 4.50 967.50
C PERALATAN 18,375.00
0.25 hr Molen 0,35 m3 73,500 18,375.00
D Jumlah A + B + C 957,691.35
E OVERHEAD & PROFIT (CONTOH) 10% 95,769.13
F Harga Satuan Pekerjaan (D+E) 1,053,460.48

12 B.07 1 m3 Beton Mutu f'c=19,3 Mpa (K225), slump (12±2) cm, w/c =0,58 1,088,055.79
a) Manual
A TENAGA 148,650.00
L.01 1.650 OH Pekerja 68,000 112,200.00
L.02 0.275 OH Tukang Batu 74,000 20,350.00
L.03 0.028 OH Kepala Tukang 80,000 2,240.00
L.04 0.165 OH Mandor 84,000 13,860.00
B BAHAN 840,491.63
371 kg PC/Portlan Cement 1,140 422,940.00
698 kg PB/Pasir Beton 236 164,528.57
1,047 kg Kr/Krikil 241 252,055.56
215 lt Air 4.50 967.50
C PERALATAN -
-
D Jumlah A + B + C 989,141.63
E OVERHEAD & PROFIT (CONTOH) 10% 98,914.16
F Harga Satuan Pekerjaan (D+E) 1,088,055.79

13 B.07 1 m3 Beton Mutu f'c=19,3 Mpa (K225), slump (12±2) cm, w/c =0,58 1,072,967.09
b) Menggunakan Molen
A TENAGA 116,558.00
L.01 1.323 OH Pekerja 68,000 89,964.00
L.02 0.189 OH Tukang Batu 74,000 13,986.00
L.03 0.019 OH Kepala Tukang 80,000 1,520.00
L.04 0.132 OH Mandor 84,000 11,088.00
B BAHAN 840,491.63
371 kg PC/Portlan Cement 1,140 422,940.00
698 kg PB/Pasir Beton 236 164,528.57
1,047 kg Kr/Krikil 241 252,055.56
215 lt Air 4.50 967.50
C PERALATAN 18,375.00
0.25 hr Molen 0,35 m3 73,500 18,375.00
D Jumlah A + B + C 975,424.63
E OVERHEAD & PROFIT (CONTOH) 10% 97,542.46
F Harga Satuan Pekerjaan (D+E) 1,072,967.09

14 B.08 1 m3 Beton Mutu f'c=21,7 Mpa (K250), slump (12±2) cm, w/c =0,56 1,100,683.56
a) Manual
A TENAGA 148,650.00
L.01 1.650 OH Pekerja 68,000 112,200.00
L.02 0.275 OH Tukang Batu 74,000 20,350.00
L.03 0.028 OH Kepala Tukang 80,000 2,240.00
L.04 0.165 OH Mandor 84,000 13,860.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

B BAHAN 851,971.42
384 kg PC/Portlan Cement 1,140 437,760.00
692 kg PB/Pasir Beton 236 163,114.29
1,039 kg Kr/Krikil 241 250,129.63
215 lt Air 4.50 967.50
C PERALATAN -
-
D Jumlah A + B + C 1,000,621.42
E OVERHEAD & PROFIT (CONTOH) 10% 100,062.14
F Harga Satuan Pekerjaan (D+E) 1,100,683.56

15 B.08 1 m3 Beton Mutu f'c=21,7 Mpa (K250), slump (12±2) cm, w/c =0,56 1,085,594.86
b) Menggunakan Molen
A TENAGA 116,558.00
L.01 1.323 OH Pekerja 68,000 89,964.00
L.02 0.189 OH Tukang Batu 74,000 13,986.00
L.03 0.019 OH Kepala Tukang 80,000 1,520.00
L.04 0.132 OH Mandor 84,000 11,088.00
B BAHAN 851,971.42
384 kg PC/Portlan Cement 1,140 437,760.00
692 kg PB/Pasir Beton 236 163,114.29
1,039 kg Kr/Krikil 241 250,129.63
215 lt Air 4.50 967.50
C PERALATAN 18,375.00
0.25 hr Molen 0,35 m3 73,500 18,375.00
D Jumlah A + B + C 986,904.42
E OVERHEAD & PROFIT (CONTOH) 10% 98,690.44
F Harga Satuan Pekerjaan (D+E) 1,085,594.86

16 B.09 1 m3 Beton Mutu f'c=24,0 Mpa (K275) kedap air 1,122,754.68


slump (12±2) cm, w/c =0,53
a) Manual
A TENAGA 148,650.00
L.01 1.650 OH Pekerja 68,000 112,200.00
L.02 0.275 OH Tukang Batu 74,000 20,350.00
L.03 0.028 OH Kepala Tukang 80,000 2,240.00
L.04 0.165 OH Mandor 84,000 13,860.00
B BAHAN 872,036.07
406 kg PC/Portlan Cement 1,140 462,840.00
684 kg PB/Pasir Beton 236 161,228.57
1,026 kg Kr/Krikil 241 247,000.00
215 lt Air 4.50 967.50
C PERALATAN -
-
D Jumlah A + B + C 1,020,686.07
E OVERHEAD & PROFIT (CONTOH) 10% 102,068.61
F Harga Satuan Pekerjaan (D+E) 1,122,754.68

17 B.09 1 m3 Beton Mutu f'c=24,0 Mpa (K275) kedap air 1,107,665.98


b) Menggunakan Molen
A TENAGA 116,558.00
L.01 1.323 OH Pekerja 68,000 89,964.00
L.02 0.189 OH Tukang Batu 74,000 13,986.00
L.03 0.019 OH Kepala Tukang 80,000 1,520.00
L.04 0.132 OH Mandor 84,000 11,088.00
B BAHAN 872,036.07
406 kg PC/Portlan Cement 1,140 462,840.00
684 kg PB/Pasir Beton 236 161,228.57
1,026 kg Kr/Krikil 241 247,000.00
215 lt Air 4.50 967.50
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

C PERALATAN 18,375.00
0.25 hr Molen 0,35 m3 73,500 18,375.00
D Jumlah A + B + C 1,006,969.07
E OVERHEAD & PROFIT (CONTOH) 10% 100,696.91
F Harga Satuan Pekerjaan (D+E) 1,107,665.98

18 B.10 1 m3 Beton Mutu f'c=26,4 Mpa (K300) kedap air, 1,129,430.75


slump (12±2) cm, w/c =0,52
a) Manual
A TENAGA 148,650.00
L.01 1.650 OH Pekerja 68,000 112,200.00
L.02 0.275 OH Tukang Batu 74,000 20,350.00
L.03 0.028 OH Kepala Tukang 80,000 2,240.00
L.04 0.165 OH Mandor 84,000 13,860.00
B BAHAN 878,105.22
413 kg PC/Portlan Cement 1,140 470,820.00
681 kg PB/Pasir Beton 236 160,521.43
1,021 kg Kr/Krikil 241 245,796.30
215 lt Air 4.50 967.50
C PERALATAN -
-
D Jumlah A + B + C 1,026,755.22
E OVERHEAD & PROFIT (CONTOH) 10% 102,675.52
F Harga Satuan Pekerjaan (D+E) 1,129,430.75

19 B.10 1 m3 Beton Mutu f'c=26,4 Mpa (K300) kedap air, 1,114,342.05


b) Menggunakan Molen
A TENAGA 116,558.00
L.01 1.323 OH Pekerja 68,000 89,964.00
L.02 0.189 OH Tukang Batu 74,000 13,986.00
L.03 0.019 OH Kepala Tukang 80,000 1,520.00
L.04 0.132 OH Mandor 84,000 11,088.00
B BAHAN 878,105.22
413 kg PC/Portlan Cement 1,140 470,820.00
681 kg PB/Pasir Beton 236 160,521.43
1,021 kg Kr/Krikil 241 245,796.30
215 lt Air 4.50 967.50
C PERALATAN 18,375.00
0.25 hr Molen 0,35 m3 73,500 18,375.00
D Jumlah A + B + C 1,013,038.22
E OVERHEAD & PROFIT (CONTOH) 10% 101,303.82
F Harga Satuan Pekerjaan (D+E) 1,114,342.05

20 B.11 1 m3 Beton Mutu f'c=28,8 Mpa (K325) kedap air, 1,199,749.38


slump (12±2) cm, w/c =0,49
a) Manual
A TENAGA 189,140.00
L.01 2.100 OH Pekerja 68,000 142,800.00
L.02 0.350 OH Tukang Batu 74,000 25,900.00
L.03 0.035 OH Kepala Tukang 80,000 2,800.00
L.04 0.210 OH Mandor 84,000 17,640.00
B BAHAN 901,541.26
439 kg PC/Portlan Cement 1,140 500,460.00
670 kg PB/Pasir Beton 236 157,928.57
1,006 kg Kr/Krikil 241 242,185.19
215 lt Air 4.50 967.50
C PERALATAN -
-
D Jumlah A + B + C 1,090,681.26
E OVERHEAD & PROFIT (CONTOH) 10% 109,068.13
F Harga Satuan Pekerjaan (D+E) 1,199,749.38
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

21 B.11 1 m3 Beton Mutu f'c=28,8 Mpa (K325) kedap air, 1,174,743.08


b) Menggunakan Molen
A TENAGA 148,032.00
L.01 1.680 OH Pekerja 68,000 114,240.00
L.02 0.240 OH Tukang Batu 74,000 17,760.00
L.03 0.024 OH Kepala Tukang 80,000 1,920.00
L.04 0.168 OH Mandor 84,000 14,112.00
B BAHAN 901,541.26
439 kg PC/Portlan Cement 1,140 500,460.00
670 kg PB/Pasir Beton 236 157,928.57
1,006 kg Kr/Krikil 241 242,185.19
215 lt Air 4.50 967.50
C PERALATAN 18,375.00
0.25 hr Molen 0,35 m3 73,500 18,375.00
D Jumlah A + B + C 1,067,948.26
E OVERHEAD & PROFIT (CONTOH) 10% 106,794.83
F Harga Satuan Pekerjaan (D+E) 1,174,743.08

22 B.12 1 m3 Beton Mutu f'c=31,2 Mpa (K350) kedap air, 1,208,668.64


slump (12±2) cm, w/c =0,48
a) Manual
A TENAGA 189,140.00
L.01 2.100 OH Pekerja 68,000 142,800.00
L.02 0.350 OH Tukang Batu 74,000 25,900.00
L.03 0.035 OH Kepala Tukang 80,000 2,800.00
L.04 0.210 OH Mandor 84,000 17,640.00
B BAHAN 909,649.67
448 kg PC/Portlan Cement 1,140 510,720.00
667 kg PB/Pasir Beton 236 157,221.43
1,000 kg Kr/Krikil 241 240,740.74
215 lt Air 4.50 967.50
C PERALATAN -
-
D Jumlah A + B + C 1,098,789.67
E OVERHEAD & PROFIT (CONTOH) 10% 109,878.97
F Harga Satuan Pekerjaan (D+E) 1,208,668.64

23 B.12 1 m3 Beton Mutu f'c=31,2 Mpa (K350) kedap air, 1,183,662.34


b) Menggunakan Molen
A TENAGA 148,032.00
L.01 1.680 OH Pekerja 68,000 114,240.00
L.02 0.240 OH Tukang Batu 74,000 17,760.00
L.03 0.024 OH Kepala Tukang 80,000 1,920.00
L.04 0.168 OH Mandor 84,000 14,112.00
B BAHAN 909,649.67
448 kg PC/Portlan Cement 1,140 510,720.00
667 kg PB/Pasir Beton 236 157,221.43
1,000 kg Kr/Krikil 241 240,740.74
215 lt Air 4.50 967.50
C PERALATAN 18,375.00
0.25 hr Molen 0,35 m3 73,500 18,375.00
D Jumlah A + B + C 1,076,056.67
E OVERHEAD & PROFIT (CONTOH) 10% 107,605.67
F Harga Satuan Pekerjaan (D+E) 1,183,662.34
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

B.13 PEKERJAAN BETON


MENGGUNAKAN READY MIXED & BAHAN ADIKTIF
1 1 m3 Beton Menggunakan Ready Mixed dan Pompa Beton 1,321,650.00
A TENAGA 96,900.00
L.01 1.000 OH Pekerja 68,000 68,000.00
L.02 0.250 OH Tukang Batu 74,000 18,500.00
L.03 0.025 OH Kepala Tukang 80,000 2,000.00
L.04 0.100 OH Mandor 84,000 8,400.00
B BAHAN 1,050,600.00
1.02 m3 Campuran Beton Ready Mixed K.225 1,030,000 1,050,600.00
C PERALATAN 54,000.00
0.12 hr Pompa dan Conveyor Beton 450,000 54,000.00
D Jumlah A + B + C 1,201,500.00
E OVERHEAD & PROFIT (CONTOH) 10% 120,150.00
F Harga Satuan Pekerjaan (D+E) 1,321,650.00
PENAMBAHAN KOEFISIEN TENAGA KERJA &
PERALATAN UNTUK MENGANGKUT
/MENAIKKAN CAMPURAN BETON DENGAN JARAK > 5 M
2 B.14 1 m3 Beton Dicorkan pada tapak berjarak <25 m 34,456.40
dg Ketinggian/kedalaman < 1m
a) Manual
A TENAGA 31,324.00
L.01 0.410 OH Pekerja 68,000 27,880.00
L.04 0.041 OH Mandor 84,000 3,444.00
B BAHAN -
-
C PERALATAN -
-
D Jumlah A + B + C 31,324.00
E OVERHEAD & PROFIT (CONTOH) 10% 3,132.40
F Harga Satuan Pekerjaan (D+E) 34,456.40

3 1 m3 Beton Dicorkan pada tapak berjarak 42,020.00

setiap tambahan jarak 25 m (horizontal)

b) Manual

A TENAGA 38,200.00

L.01 0.500 OH Pekerja 68,000 34,000.00


L.04 0.050 OH Mandor 84,000 4,200.00

B BAHAN -

C PERALATAN -

D Jumlah A + B + C 38,200.00
E OVERHEAD & PROFIT (CONTOH) 10% 3,820.00
F Harga Satuan Pekerjaan (D+E) 42,020.00

4 1 m3 Beton Dicorkan pada tapak berjarak 76,208.00


c) Menggunakan Peralatan Pompa Beton

A TENAGA 15,280.00

L.01 0.200 OH Pekerja 68,000 13,600.00

L.04 0.020 OH Mandor 84,000 1,680.00

B BAHAN -

-
C PERALATAN 54,000.00

0.12 hr Pompa & Conveyor Beton 450,000 54,000.00

D Jumlah A + B + C 69,280.00

E OVERHEAD & PROFIT (CONTOH) 10% 6,928.00

F Harga Satuan Pekerjaan (D+E) 76,208.00


HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

5 B.15 1 m3 Beton Dicorkan Menggunakan Vibrator 37,510.00

a) Vibrator

A TENAGA 19,100.00

L.01 0.250 OH Pekerja 68,000 17,000.00

L.04 0.025 OH Mandor 84,000 2,100.00

B BAHAN -
-

C PERALATAN 15,000.00

0.1 hr Vibrator 150,000 15,000.00

D Jumlah A + B + C 34,100.00

E OVERHEAD & PROFIT (CONTOH) 10% 3,410.00

F Harga Satuan Pekerjaan (D+E) 37,510.00

6 1 m3 Beton Dicorkan Menggunakan Vibrator 58,520.00

b) Tenaga Kerja Manual dan Vibrator

A TENAGA 38,200.00

L.01 0.500 OH Pekerja 68,000 34,000.00

L.04 0.050 OH Mandor 84,000 4,200.00


B BAHAN -

C PERALATAN 15,000.00

0.1 hr Vibrator 150,000 15,000.00

D Jumlah A + B + C 53,200.00

E OVERHEAD & PROFIT (CONTOH) 10% 5,320.00


F Harga Satuan Pekerjaan (D+E) 58,520.00

7 B.16 1 m3 Beton Dicorkan pada tapak Tiap Kenaikan 4 m (vertikal) 21,010.00

a) Manual

A TENAGA 19,100.00

L.01 0.250 OH Pekerja 68,000 17,000.00


L.04 0.025 OH Mandor 84,000 2,100.00

B BAHAN -

C PERALATAN -

D Jumlah A + B + C 19,100.00
E OVERHEAD & PROFIT (CONTOH) 10% 1,910.00

F Harga Satuan Pekerjaan (D+E) 21,010.00

8 1 m3 Beton Dicorkan pada tapak Tiap Kenaikan 4 m (vertikal) 76,208.00

b) Menggunakan peralatan pompa beton

A TENAGA 15,280.00

L.01 0.200 OH Pekerja 68,000 13,600.00


L.04 0.020 OH Mandor 84,000 1,680.00

B BAHAN -

C PERALATAN 54,000.00

0.12 hr Pompa & Conveyor Beton 450,000 54,000.00

D Jumlah A + B + C 69,280.00
E OVERHEAD & PROFIT (CONTOH) 10% 6,928.00

F Harga Satuan Pekerjaan (D+E) 76,208.00


HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

PEKERJAAN PEMBESIAN BETON

9 B.17 100 kg Pembesian dengan Besi Polos atau Ulir 1,597,068.00

A TENAGA 110,880.00

L.01 0.700 OH Pekerja 68,000 47,600.00

L.02 0.700 OH Tukang Besi 74,000 51,800.00

L.03 0.070 OH Kepala Tukang 80,000 5,600.00


L.04 0.070 OH Mandor 84,000 5,880.00

B BAHAN 1,341,000.00

105.0 kg Besi Beton (polos/ulir) 12,500 1,312,500.00

1.5 kg Kawat Ikat 19,000 28,500.00

C PERALATAN -

-
D Jumlah A + B + C 1,451,880.00

E OVERHEAD & PROFIT (CONTOH) 10% 145,188.00

F Harga Satuan Pekerjaan (D+E) 1,597,068.00

10 B.18 100 kg Pembesian dengan Jaring Kawat (wire mesh) 1,501,390.00

A TENAGA 39,600.00
L.01 0.250 OH Pekerja 68,000 17,000.00

L.02 0.250 OH Tukang Besi 74,000 18,500.00

L.03 0.025 OH Kepala Tukang 80,000 2,000.00

L.04 0.025 OH Mandor 84,000 2,100.00

B BAHAN 1,325,300.00

102.0 kg Wire Mesh 12,900 1,315,800.00


0.5 kg Kawat Ikat 19,000 9,500.00

C PERALATAN -

D Jumlah A + B + C 1,364,900.00

E OVERHEAD & PROFIT (CONTOH) 10% 136,490.00

F Harga Satuan Pekerjaan (D+E) 1,501,390.00

11 B.19 100 kg Pembesian Kabel presstreed polos 1,893,870.00

A TENAGA 79,200.00

L.01 0.500 OH Pekerja 68,000 34,000.00

L.02 0.500 OH Tukang Besi 74,000 37,000.00

L.03 0.050 OH Kepala Tukang 80,000 4,000.00


L.04 0.050 OH Mandor 84,000 4,200.00

B BAHAN 1,552,500.00

105.0 kg Kabel presstreed polos 12,500 1,312,500.00

12.5 kg Besi Beton (polos/ulir) 12,500 156,250.00

0.5 kg Kawat beton 19,000 9,500.00

7.5 lt BBM 9,900 74,250.00

C PERALATAN 90,000.00
0.15 hr Jack Tension / stressing 600,000 90,000.00

D Jumlah A + B + C 1,721,700.00

E OVERHEAD & PROFIT (CONTOH) 10% 172,170.00

F Harga Satuan Pekerjaan (D+E) 1,893,870.00

12 B.20 PENAMBAHAN KOEFISIEN TENAGA KERJA & PERALATAN


UNTUK MENGANGKUT / MENAIKAN 100 KG

TULANGAN SETIAP KENAIKAN VERTIKAL 4 M' ATAU

JARAK HORIZONTAL 25 M' KE TAPAK PEMASANGAN

a) 4 m' Manual 33,352.00

A TENAGA 30,320.00

L.01 0.300 OH Pekerja 68,000 20,400.00


HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

L.02 0.100 OH Tukang Besi 74,000 7,400.00

L.04 0.030 OH Mandor 84,000 2,520.00

B BAHAN

C PERALATAN -

D Jumlah A + B + C 30,320.00

E OVERHEAD & PROFIT (CONTOH) 10% 3,032.00

F Harga Satuan Pekerjaan (D+E) 33,352.00

b) 10 s/d 25 m' Mekanis (penambahan jarak horizontal) 22,539.00

A TENAGA 18,240.00
L.01 0.200 OH Pekerja 68,000 13,600.00

L.02 0.040 OH Tukang Besi 74,000 2,960.00

L.04 0.020 OH Mandor 84,000 1,680.00

B BAHAN

C PERALATAN 2,250.00
0.025 hr Crane 90,000 2,250.00

D Jumlah A + B + C 20,490.00

E OVERHEAD & PROFIT (CONTOH) 10% 2,049.00

F Harga Satuan Pekerjaan (D+E) 22,539.00

c) 25 m' Mekanis (penambahan jarak horizontal) 35,827.00


A TENAGA 30,320.00

L.01 0.300 OH Pekerja 68,000 20,400.00

L.02 0.100 OH Tukang Besi 74,000 7,400.00

L.04 0.030 OH Mandor 84,000 2,520.00

B BAHAN

C PERALATAN 2,250.00

0.025 hr Crane 90,000 2,250.00

D Jumlah A + B + C 32,570.00

E OVERHEAD & PROFIT (CONTOH) 10% 3,257.00

F Harga Satuan Pekerjaan (D+E) 35,827.00

d) 4 m' Mekanis (penambahan tiap 4 m' jarak vertikal) 35,827.00

A TENAGA 30,320.00

L.01 0.300 OH Pekerja 68,000 20,400.00

L.02 0.100 OH Tukang Besi 74,000 7,400.00

L.04 0.030 OH Mandor 84,000 2,520.00

B BAHAN

C PERALATAN 2,250.00

0.025 hr Crane 90,000 2,250.00

D Jumlah A + B + C 32,570.00

E OVERHEAD & PROFIT (CONTOH) 10% 3,257.00

F Harga Satuan Pekerjaan (D+E) 35,827.00


HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

PEKERJAAN BEKISTING
1 B.21.b 1 m2 Bekisting untuk permukaan beton biasa 76,214.60
dg multipleks 12 mm atau 18 mm (tanpa perancah)
A TENAGA 23,480.00
L.01 0.200 OH Pekerja 68,000 13,600.00
L.02 0.100 OH Tukang kayu 74,000 7,400.00
L.03 0.010 OH Kepala Tukang 80,000 800.00
L.04 0.020 OH Mandor 84,000 1,680.00
B BAHAN 45,806.00
0.128 lbr Multipleks 18 mm 210,000 26,880.00
0.005 m3 Kaso 5/7x 4.00 2,400,000 12,000.00
0.220 kg Paku 13,300 2,926.00
0.200 ltr Minyak Beton 20,000 4,000.00
C PERALATAN -
-
D Jumlah A + B + C 69,286.00
E OVERHEAD & PROFIT (CONTOH) 10% 6,928.60
F Harga Satuan Pekerjaan (D+E) 76,214.60
koef. Multipleks

0.3500
catatan : bahan digunakan lebih dari satu kali,
0.2450

0.2100

2 B.21.c 1 m2 Bekisting untuk permukaan beton biasa 75,702.00

dengan papan ukuran 3/20 (tanpa perancah)


A TENAGA 35,220.00

L.01 0.300 OH Pekerja 68,000 20,400.00

L.02 0.150 OH Tukang kayu 74,000 11,100.00

L.03 0.015 OH Kepala Tukang 80,000 1,200.00

L.04 0.030 OH Mandor 84,000 2,520.00

B BAHAN 33,600.00
0.0140 m3 Papan 2/30 2,400,000 33,600.00

0.0030 m3 Kaso 5/7x 4.00 2,400,000 7,200.00


0.3000 kg Paku 13,300 3,990.00

0.2000 ltr Minyak Beton 20,000 4,000.00

C PERALATAN -

-
D Jumlah A + B + C 68,820.00
E OVERHEAD & PROFIT (CONTOH) 10% 6,882.00

F Harga Satuan Pekerjaan (D+E) 75,702.00


catatan : bahan digunakan lebih dari satu kali, koef. papan

0.0400

0.0280

0.0240

3 B.21.a 1 m2 Bekisting untuk permukaan beton expose 107,276.40


dg multipleks 12 / 18 mm & kaso 5/7 (tanpa perancah)
A TENAGA 47,520.00

L.01 0.300 OH Pekerja 68,000 20,400.00

L.02 0.300 OH Tukang kayu 74,000 22,200.00

L.03 0.030 OH Kepala Tukang 80,000 2,400.00

L.04 0.030 OH Mandor 84,000 2,520.00


B BAHAN 50,004.00

0.1280 lbr multipleks 18 mm 210,000 26,880.00

0.0060 m3 Kaso 5/7x 4.00 2,400,000 14,400.00

0.2800 kg Paku 13,300 3,724.00


0.2500 ltr Minyak Beton 20,000 5,000.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

C PERALATAN -
-

D Jumlah A + B + C 97,524.00

E OVERHEAD & PROFIT (CONTOH) 10% 9,752.40

F Harga Satuan Pekerjaan (D+E) 107,276.40


catatan : bahan digunakan lebih dari satu kali, koef. multipleks

0.3500

0.2450

0.2100

4 B.21.d 1 m2 Perancah Beksiting kaso 5/7 tinggi 4m' 95,199.50

A TENAGA 35,220.00
L.01 0.300 OH Pekerja 68,000 20,400.00

L.02 0.150 OH Tukang kayu 74,000 11,100.00

L.03 0.015 OH Kepala Tukang 80,000 1,200.00

L.04 0.030 OH Mandor 84,000 2,520.00

B BAHAN 51,325.00

0.0200 m3 Kaso 5/7x 4.00 2,400,000 48,000.00

0.2500 kg Paku 13,300 3,325.00

C PERALATAN -
-

D Jumlah A + B + C 86,545.00

E OVERHEAD & PROFIT (CONTOH) 10% 8,654.50

F Harga Satuan Pekerjaan (D+E) 95,199.50


catatan : bahan digunakan lebih dari satu kali,

5 B.21.e 1 m2 Perancah Beksiting kayu dolken Ø 8 - 10 cm tinggi 4m' 61,975.65

A TENAGA 39,916.00
L.01 0.340 OH Pekerja 68,000 23,120.00

L.02 0.170 OH Tukang kayu 74,000 12,580.00


L.03 0.017 OH Kepala Tukang 80,000 1,360.00

L.04 0.034 OH Mandor 84,000 2,856.00

B BAHAN 16,425.50

1.4630 bt Kayu Dolken Ø 8 - 10 cm tinggi 4 m' 8,500 12,435.50

0.3000 kg Paku 13,300 3,990.00

C PERALATAN -

D Jumlah A + B + C 56,341.50

E OVERHEAD & PROFIT (CONTOH) 10% 5,634.15

F Harga Satuan Pekerjaan (D+E) 61,975.65


catatan : bahan digunakan lebih dari satu kali, dolken

8.0000

4.0000

3.0000

6 B.23.b 1 m2 Bekisting balok beton biasa dg multipleks 12/18 mm 97,659.10

Tanpa perancah

A TENAGA 28,176.00

L.01 0.240 OH Pekerja 68,000 16,320.00

L.02 0.120 OH Tukang kayu 74,000 8,880.00

L.03 0.012 OH Kepala Tukang 80,000 960.00


L.04 0.024 OH Mandor 84,000 2,016.00

B BAHAN 60,605.00

0.1280 lbr multipleks 18 mm 210,000 26,880.00


0.0110 m3 Kaso 5/7x 4.00 2,400,000 26,400.00

0.2500 kg Paku 13,300 3,325.00

0.2000 ltr Minyak Beton 20,000 4,000.00


HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

C PERALATAN -
-

D Jumlah A + B + C 88,781.00

E OVERHEAD & PROFIT (CONTOH) 10% 8,878.10

F Harga Satuan Pekerjaan (D+E) 97,659.10


catatan : bahan digunakan lebih dari satu kali, koef multipleks

0.3500

0.2450

0.2100

7 B.23.d 1 m2 Perancah Beksiting balok dengan kaso 5/7 tinggi 4m' 79,041.60

A TENAGA 42,264.00
L.01 0.360 OH Pekerja 68,000 24,480.00

L.02 0.180 OH Tukang kayu 74,000 13,320.00

L.03 0.018 OH Kepala Tukang 80,000 1,440.00

L.04 0.036 OH Mandor 84,000 3,024.00

B BAHAN 29,592.00

0.0110 m3 Kaso 5/7x 4.00 2,400,000 26,400.00

0.2400 kg Paku 13,300 3,192.00

C PERALATAN -
-

D Jumlah A + B + C 71,856.00

E OVERHEAD & PROFIT (CONTOH) 10% 7,185.60

F Harga Satuan Pekerjaan (D+E) 79,041.60


catatan : bahan digunakan lebih dari satu kali,

8 B.23.e 1 m2 Perancah Beksiting kayu dolken Ø 8 - 10 cm tinggi 4m' 63,353.95

A TENAGA 46,960.00
L.01 0.400 OH Pekerja 68,000 27,200.00

L.02 0.200 OH Tukang kayu 74,000 14,800.00


L.03 0.020 OH Kepala Tukang 80,000 1,600.00

L.04 0.040 OH Mandor 84,000 3,360.00

B BAHAN 10,634.50

0.8130 bt Kayu Dolken Ø 8 - 10 cm tinggi 4 m' 8,500 6,910.50

0.2800 kg Paku 13,300 3,724.00

C PERALATAN -

D Jumlah A + B + C 57,594.50

E OVERHEAD & PROFIT (CONTOH) 10% 5,759.45

F Harga Satuan Pekerjaan (D+E) 63,353.95


catatan : bahan digunakan lebih dari satu kali, dolken

8.0000

4.0000

3.0000

9 B.24.b 1 m2 Bekisting Kolom beton biasa dg multipleks 12/18 mm 81,876.30

A TENAGA 25,828.00

L.01 0.220 OH Pekerja 68,000 14,960.00

L.02 0.110 OH Tukang kayu 74,000 8,140.00

L.03 0.011 OH Kepala Tukang 80,000 880.00


L.04 0.022 OH Mandor 84,000 1,848.00

B BAHAN 48,605.00

0.1280 lbr multipleks 18 mm 210,000 26,880.00


0.0060 m3 Kaso 5/7x 4.00 2,400,000 14,400.00

0.2500 kg Paku 13,300 3,325.00

0.2000 ltr Minyak Beton 20,000 4,000.00


HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

C PERALATAN -
-

D Jumlah A + B + C 74,433.00

E OVERHEAD & PROFIT (CONTOH) 10% 7,443.30

F Harga Satuan Pekerjaan (D+E) 81,876.30


catatan : bahan digunakan lebih dari satu kali, koef multipleks

0.3500

0.2450

0.2100

10 B.24.c 1 m2 Bekisting Kolom beton biasa dg papan uk.3/20 cm 105,496.60

A TENAGA 39,916.00

L.01 0.340 OH Pekerja 68,000 23,120.00

L.02 0.170 OH Tukang kayu 74,000 12,580.00

L.03 0.017 OH Kepala Tukang 80,000 1,360.00

L.04 0.034 OH Mandor 84,000 2,856.00

B BAHAN 55,990.00

0.0140 m3 papan kayu uk 3/20 0.03 2,400,000 33,600.00


0.0060 m3 Kaso 5/7x 4.00 0.2 2,400,000 14,400.00

0.3000 kg Paku 4 13,300 3,990.00

0.2000 ltr Minyak Beton 0.024 20,000 4,000.00

C PERALATAN -

D Jumlah A + B + C 95,906.00

E OVERHEAD & PROFIT (CONTOH) 10% 9,590.60

F Harga Satuan Pekerjaan (D+E) 105,496.60


catatan : bahan digunakan lebih dari satu kali, papan

0.0400

0.0280

0.0240

11 B.25.b 1 m2 Bekisting Dinding beton biasa dengan 81,672.80

Multipleks 12 cm / 18 cm

A TENAGA 28,176.00

L.01 0.240 OH Pekerja 68,000 16,320.00

L.02 0.120 OH Tukang kayu 74,000 8,880.00

L.03 0.012 OH Kepala Tukang 80,000 960.00

L.04 0.024 OH Mandor 84,000 2,016.00

B BAHAN 46,072.00

0.1280 lbr Multipleks 12 cm / 18 cm 210,000 26,880.00

0.0050 m3 Kaso 5/7x 4.00 2,400,000 12,000.00

0.2400 kg Paku 13,300 3,192.00

0.2000 ltr Minyak Beton 20,000 4,000.00


C PERALATAN -
-

D Jumlah A + B + C 74,248.00

E OVERHEAD & PROFIT (CONTOH) 10% 7,424.80

F Harga Satuan Pekerjaan (D+E) 81,672.80


catatan : bahan digunakan lebih dari satu kali, multipleks

0.3500

0.2450

0.2100

12 B.25.c 1 m2 Bekisting Dinding beton biasa dengan 105,439.40

Papan 3/20 cm
A TENAGA 42,264.00

L.01 0.360 OH Pekerja 68,000 24,480.00

L.02 0.180 OH Tukang kayu 74,000 13,320.00

L.03 0.018 OH Kepala Tukang 80,000 1,440.00


L.04 0.036 OH Mandor 84,000 3,024.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

B BAHAN 53,590.00
0.0140 lbr Papan 3/20 cm 2,400,000 33,600.00

0.0050 m3 Kaso 5/7x 4.00 2,400,000 12,000.00

0.3000 kg Paku 13,300 3,990.00

0.2000 ltr Minyak Beton 20,000 4,000.00


C PERALATAN -

D Jumlah A + B + C 95,854.00
E OVERHEAD & PROFIT (CONTOH) 10% 9,585.40

F Harga Satuan Pekerjaan (D+E) 105,439.40


catatan : bahan digunakan lebih dari satu kali, papan

0.0400

0.0280

0.0240

13 B.26.a 1 m2 Bekisting Pondasi dan sloof beton biasa dengan 87,213.50

Multipleks 12 cm / 18 cm

A TENAGA 23,480.00

L.01 0.200 OH Pekerja 68,000 13,600.00

L.02 0.100 OH Tukang kayu 74,000 7,400.00


L.03 0.010 OH Kepala Tukang 80,000 800.00

L.04 0.020 OH Mandor 84,000 1,680.00

B BAHAN 55,805.00

0.1280 lbr Multipleks 12 cm / 18 cm 210,000 26,880.00

0.0090 m3 Kaso 5/7x 4.00 2,400,000 21,600.00

0.2500 kg Paku 13,300 3,325.00

0.2000 ltr Minyak Beton 20,000 4,000.00

C PERALATAN -

D Jumlah A + B + C 79,285.00
E OVERHEAD & PROFIT (CONTOH) 10% 7,928.50

F Harga Satuan Pekerjaan (D+E) 87,213.50


catatan : bahan digunakan lebih dari satu kali, multipleks

0.3500

0.2450

0.2100

14 B.26.b 1 m2 Bekisting Pondasi dan sloof beton biasa dengan 108,251.00

Papan 3/20 cm

A TENAGA 35,220.00

L.01 0.300 OH Pekerja 68,000 20,400.00

L.02 0.150 OH Tukang kayu 74,000 11,100.00

L.03 0.015 OH Kepala Tukang 80,000 1,200.00

L.04 0.030 OH Mandor 84,000 2,520.00

B BAHAN 63,190.00
0.0140 lbr Papan 3/20 cm 2,400,000 33,600.00
0.0090 m3 Kaso 5/7x 4.00 2,400,000 21,600.00

0.3000 kg Paku 13,300 3,990.00

0.2000 ltr Minyak Beton 20,000 4,000.00

C PERALATAN -

D Jumlah A + B + C 98,410.00

E OVERHEAD & PROFIT (CONTOH) 10% 9,841.00


F Harga Satuan Pekerjaan (D+E) 108,251.00

catatan : bahan digunakan lebih dari satu kali, papan

0.0400

0.0280

0.0240
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

BONGKAR BEKISTING
Bongkar Beksiting tiap m2 diambil untuk kondisi biasa 10% - 15% dari Upah Kerja Pemasangan

untuk pembongkaran material pakai ulang maka biaya bongkar 20% - 25% dari Upah Pemasangan

Jika tidak ditentukan lain dapat menggunakan acuan sebagai berikut :

15 B.27.a 1 m2 Bongkar Bekisting secara Biasa, 3,361.60


dan membersihkan puing-puing

A TENAGA 3,056.00

L.01 0.040 OH Pekerja 68,000 2,720.00


L.04 0.004 OH Mandor 84,000 336.00

B BAHAN -

C PERALATAN -
D Jumlah A + B + C 3,056.00

E OVERHEAD & PROFIT (CONTOH) 10% 305.60

F Harga Satuan Pekerjaan (D+E) 3,361.60

16 B.27.b 1 m2 Bongkar Bekisting secara Biasa, 5,042.40

dengan hati-hati

A TENAGA 4,584.00

L.01 0.060 OH Pekerja 68,000 4,080.00


L.04 0.006 OH Mandor 84,000 504.00

B BAHAN -

C PERALATAN -

D Jumlah A + B + C 4,584.00

E OVERHEAD & PROFIT (CONTOH) 10% 458.40

F Harga Satuan Pekerjaan (D+E) 5,042.40

KOEFISIEN UNT ANALISIS HARGA SATUAN PEKERJAAN PELAKSANAAN CURING

ada berbagai cara pelaksanaan curing beton diantaranya :

menggenangi atau menyiram permukaan beton, dan dengan uap (steam).


Jika tidak ditentukan dapat menggunakan acuan sebagai berikut

17 B.28.a 100 m2 Menggenangi air permukaan beton 88,286.00

A TENAGA 57,760.00

L.01 0.800 OH Pekerja 68,000 54,400.00

L.04 0.040 OH Mandor 84,000 3,360.00

B BAHAN 22,500.00

5.000 m3 Air 4,500 22,500.00

C PERALATAN -

D Jumlah A + B + C 80,260.00

E OVERHEAD & PROFIT (CONTOH) 10% 8,026.00

F Harga Satuan Pekerjaan (D+E) 88,286.00

18 B.28.b 100 m2 Menyirami air permukaan beton 123,332.00


a) Memasang terpal / karung goni basah
A TENAGA 61,120.00

L.01 0.800 OH Pekerja 68,000 54,400.00

L.04 0.080 OH Mandor 84,000 6,720.00

B BAHAN 51,000.00

102.000 m2 karung goni 500 51,000.00

C PERALATAN -

D Jumlah A + B + C 112,120.00
E OVERHEAD & PROFIT (CONTOH) 10% 11,212.00

F Harga Satuan Pekerjaan (D+E) 123,332.00

17 B.28.c 100 m2 Menyirami air permukaan beton 257,840.00

b) dengan air selama 4 hari

A TENAGA 144,400.00

L.01 2.000 OH Pekerja 68,000 136,000.00


L.04 0.100 OH Mandor 84,000 8,400.00

B BAHAN 90,000.00

20.000 m3 Air 4,500 90,000.00


C PERALATAN -

D Jumlah A + B + C 234,400.00

E OVERHEAD & PROFIT (CONTOH) 10% 23,440.00


F Harga Satuan Pekerjaan (D+E) 257,840.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

AHSP (ANALISA HARGA SATUAN PEKERJAAN)


PEMANCANGAN SECARA MANUAL / TANPA MESIN MENGGUNAKAN TRIPOD DAN HAMMER
1 F.01 1 m' Tiang pancang kayu gelondong 78,490.50
A TENAGA 39,930.00
L.01 0.450 OH Pekerja 68,000 30,600.00
L.02 0.075 OH Tukang batu 74,000 5,550.00
L.04 0.045 OH Mandor 84,000 3,780.00
B BAHAN 8,925.00
1.0500 m' Kayu dolken Ø 15 - 20 cm 8,500 8,925.00
C PERALATAN 22,500.00

0.075 hr Tripod tinggi 5 m' 150,000 11,250.00

0.075 hr Hammer 1 - 2 ton (manual) 150,000 11,250.00


- bh Alat Penyambung Tiang Pancang 50,000 -
D Jumlah A + B + C 71,355.00
E OVERHEAD & PROFIT (CONTOH) 10% 7,135.50
F Harga Satuan Pekerjaan (D+E) 78,490.50

2 F.03 1 m' Tiang pancang baja pipa atau kotak Ø 30cm 773,300.00
A TENAGA 21,200.00
L.01 0.200 OH Pekerja 68,000 13,600.00
L.02 0.040 OH Tukang batu 74,000 2,960.00

L.02 0.040 OH Tukang Listrik 74,000 2,960.00

L.04 0.020 OH Mandor 84,000 1,680.00


B BAHAN 667,200.00
1.020 m' Tiang pancang baja pipa Ø 30 cm 650,000 663,000.00
0.150 kg Kawat Las Listrik 28,000 4,200.00
C PERALATAN 14,600.00

0.040 hr Tripod tinggi 5 m' 150,000 6,000.00

0.040 hr Hammer 1 - 2 ton (manual) 150,000 6,000.00


0.040 hr Las listrik diesel (termasuk solar) 65,000 2,600.00
D Jumlah A + B + C 703,000.00
E OVERHEAD & PROFIT (CONTOH) 10% 70,300.00
F Harga Satuan Pekerjaan (D+E) 773,300.00

3 F.04.c 1 m' Tiang pancang beton bertulang 30 x 30 cm 354,671.08

A TENAGA 47,916.00

L.01 0.540 OH Pekerja 68,000 36,720.00


L.02 0.090 OH Tukang batu 74,000 6,660.00

L.04 0.054 OH Mandor 84,000 4,536.00


B BAHAN 247,512.25
1.030 m' Tiang pancang beton bertulang 30 x 30 cm 240,303 247,512.25
-

C PERALATAN 27,000.00

0.0900 hr Tripod tinggi 5 m' 150,000 13,500.00

0.0900 hr Hammer 1 - 2 ton (manual) 150,000 13,500.00


- hr Alat Penyambung tiang pancang 50,000 -
D Jumlah A + B + C 322,428.25

E OVERHEAD & PROFIT (CONTOH) 10% 32,242.83


F Harga Satuan Pekerjaan (D+E) 354,671.08

4 F.04.d 1 m' Tiang pancang beton bertulang 40 x 40 cm 584,744.36


A TENAGA 58,564.00
L.01 0.6600 OH Pekerja 68,000 44,880.00
L.02 0.1100 OH Tukang batu 74,000 8,140.00
L.04 0.0660 OH Mandor 84,000 5,544.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

B BAHAN 440,021.78
1.030 m' Tiang pancang beton bertulang 40 x 40 cm 427,206 440,021.78

-
C PERALATAN 33,000.00

0.1100 hr Tripod tinggi 5 m' 150,000 16,500.00

0.1100 hr Hammer 1 - 2 ton (manual) 150,000 16,500.00

- hr Alat Penyambung tiang pancang 50,000 -


D Jumlah A + B + C 531,585.78

E OVERHEAD & PROFIT (CONTOH) 10% 53,158.58


F Harga Satuan Pekerjaan (D+E) 584,744.36

5 F.05.a 1 m' Turap Kayu Dolken Ø 8 - 10 cm 264,055.00


A TENAGA 75,800.00
L.01 0.750 OH Pekerja 68,000 51,000.00
L.02 0.250 OH Tukang batu 74,000 18,500.00
L.04 0.075 OH Mandor 84,000 6,300.00
B BAHAN 89,250.00

10.5000 m' Kayu dolken Ø 8 - 10 cm 8,500 89,250.00


C PERALATAN 75,000.00

0.25 hr Tripod tinggi 5 m' 150,000 37,500.00

0.25 hr Hammer 1 - 2 ton (manual) 150,000 37,500.00


- bh Alat Penyambung Tiang Pancang 50,000 -
D Jumlah A + B + C 240,050.00
E OVERHEAD & PROFIT (CONTOH) 10% 24,005.00

F Harga Satuan Pekerjaan (D+E) 264,055.00

6 F.06 1 m' Turap Baja Profil Larsen 111,925.00

A TENAGA 26,500.00
L.01 0.2500 OH Pekerja 68,000 17,000.00
L.02 0.0500 OH Tukang batu 74,000 3,700.00

L.02 0.0500 OH Tukang Las Listrik 74,000 3,700.00


L.04 0.0250 OH Mandor 84,000 2,100.00
B BAHAN 57,750.00
1.050 m' Turap Baja Profil Larsen lebar 350 mm 55,000 57,750.00
-

C PERALATAN 17,500.00

0.0500 hr Tripod tinggi 5 m' 150,000 7,500.00

0.0500 hr Hammer 1 - 2 ton (manual) 150,000 7,500.00

0.0500 hr Las listrik diesel (termasuk solar) 50,000 2,500.00


D Jumlah A + B + C 101,750.00
E OVERHEAD & PROFIT (CONTOH) 10% 10,175.00

F Harga Satuan Pekerjaan (D+E) 111,925.00

7 F.07.a 1 m' Turap Beton Bertulang Precast (12 x 30 cm) 136,422.00

A TENAGA 26,620.00
L.01 0.3000 OH Pekerja 68,000 20,400.00
L.02 0.0500 OH Tukang batu 74,000 3,700.00
L.04 0.0300 OH Mandor 84,000 2,520.00
B BAHAN 82,400.00
1.0300 m' Beton bertulang precast 80,000 82,400.00

C PERALATAN 15,000.00

0.05 hr Tripod tinggi 5 m' 150,000 7,500.00

0.05 hr Hammer 1 - 2 ton (manual) 150,000 7,500.00


bh Alat Penyambung Tiang Pancang 50,000 -
D Jumlah A + B + C 124,020.00
E OVERHEAD & PROFIT (CONTOH) 10% 12,402.00
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

F Harga Satuan Pekerjaan (D+E) 136,422.00


HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

8 F.07.b 1 m' Turap Beton Bertulang Precast (15 x 40 cm) 226,206.20

A TENAGA 42,592.00
L.01 0.4800 OH Pekerja 68,000 32,640.00
L.02 0.0800 OH Tukang batu 74,000 5,920.00
L.04 0.0480 OH Mandor 84,000 4,032.00

B BAHAN 139,050.00
1.0300 m' Beton bertulang precast 135,000 139,050.00

C PERALATAN 24,000.00

0.08 hr Tripod tinggi 5 m' 150,000 12,000.00

0.08 hr Hammer 1 - 2 ton (manual) 150,000 12,000.00

bh Alat Penyambung Tiang Pancang 50,000 -


D Jumlah A + B + C 205,642.00
E OVERHEAD & PROFIT (CONTOH) 10% 20,564.20
F Harga Satuan Pekerjaan (D+E) 226,206.20

9 F.07.c 1 m' Turap Beton Bertulang Precast (22 x 50 cm) 374,814.00

A TENAGA 53,240.00
L.01 0.6000 OH Pekerja 68,000 40,800.00

L.02 0.1000 OH Tukang batu 74,000 7,400.00

L.04 0.0600 OH Mandor 84,000 5,040.00


B BAHAN 257,500.00
1.0300 m' Beton bertulang precast 250,000 257,500.00
C PERALATAN 30,000.00

0.1 hr Tripod tinggi 5 m' 150,000 15,000.00

0.1 hr Hammer 1 - 2 ton (manual) 150,000 15,000.00


bh Alat Penyambung Tiang Pancang 50,000 -

D Jumlah A + B + C 340,740.00
E OVERHEAD & PROFIT (CONTOH) 10% 34,074.00
F Harga Satuan Pekerjaan (D+E) 374,814.00

AHSP Pemancangan Secara Mekanis


10 F.10 1 m' Tiang pancang kayu gelondong 36,081.87
A TENAGA 6,219.20
L.01 0.0520 OH Pekerja 68,000 3,536.00

L.02 0.0104 OH Tukang 74,000 769.60

L.04 0.0052 OH Mandor 84,000 436.80


L.05 0.0104 Oh Operator Crane 74,000 769.60

L.06 0.0104 OH Pembantu Operator 68,000 707.20


B BAHAN 12,022.50
1.0500 m' Kayu dolken Ø 15 - 20 cm 11,450 12,022.50

C PERALATAN 14,560.00

0.0728 jam Crane 5 - 10 ton 125,000 9,100.00

0.0728 jam Hammer 2 ton 75,000 5,460.00

bh Alat Penyambung Tiang Pancang 50,000 -


D Jumlah A + B + C 32,801.70
E OVERHEAD & PROFIT (CONTOH) 10% 3,280.17
F Harga Satuan Pekerjaan (D+E) 36,081.87

11 F.11 1 m' Tiang pancang baja pipa atau kotak Ø 30cm 745,991.95

A TENAGA 4,675.00
L.01 0.0345 OH Pekerja 68,000 2,346.00

L.02 0.0069 OH Tukang 74,000 510.60


L.02 0.0069 OH Tukang Las Listrik 74,000 510.60
L.05 0.0035 Oh Operator Crane 74,000 259.00
L.06 0.0069 OH Pembantu Operator 68,000 469.20
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

L.04 0.0069 OH Mandor 84,000 579.60


HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

B BAHAN 660,700.00
1.010 m' Tiang pancang baja pipa Ø 30 cm 650,000 656,500.00

0.150 kg Kawat Las Kistrik 28,000 4,200.00


C PERALATAN 12,799.50

0.0483 jam Crane 5 - 10 ton 125,000 6,037.50

0.0483 jam Hammer 2 ton 75,000 3,622.50

0.0483 hr Las listrik diesel (termasuk solar) 65,000 3,139.50


D Jumlah A + B + C 678,174.50

E OVERHEAD & PROFIT (CONTOH) 10% 67,817.45


F Harga Satuan Pekerjaan (D+E) 745,991.95

12 F.12 1 m' Tiang pancang beton bertulang 30 x 30 cm 300,538.76


A TENAGA 5,684.80
L.01 0.0345 OH Pekerja 68,000 2,346.00
L.02 0.0069 OH Tukang 74,000 510.60
L.04 0.025 OH Mandor 84,000 2,100.00
L.05 0.0035 Oh Operator Crane 74,000 259.00

L.06 0.0069 OH Pembantu Operator 68,000 469.20


B BAHAN 247,512.25

1.030 m' Tiang pancang beton bertulang 30 x 30 cm 240,303 247,512.25

-
C PERALATAN 20,020.00

0.0728 jam Crane 5 - 10 ton 125,000 9,100.00

0.0728 jam Hammer 2 ton 150,000 10,920.00

bh Alat Penyambung tiang pancang 50,000 -


D Jumlah A + B + C 273,217.05
E OVERHEAD & PROFIT (CONTOH) 10% 27,321.71

F Harga Satuan Pekerjaan (D+E) 300,538.76

13 F.13 1 m' Tiang pancang beton bertulang 40 x 40 cm 531,823.25

A TENAGA 11,306.40
L.01 0.0945 OH Pekerja 68,000 6,426.00
L.02 0.0189 OH Tukang 74,000 1,398.60
L.04 0.0095 OH Mandor 84,000 798.00
L.05 0.0189 Oh Operator Crane 74,000 1,398.60

L.06 0.0189 OH Pembantu Operator 68,000 1,285.20

B BAHAN 440,021.78
1.030 m' Tiang pancang beton bertulang 40 x 40 cm 427,206 440,021.78

-
C PERALATAN 32,147.50

0.1169 jam Crane 5 - 10 ton 125,000 14,612.50

0.1169 jam Hammer 2 ton 150,000 17,535.00


bh Alat Penyambung tiang pancang 50,000 -
D Jumlah A + B + C 483,475.68

E OVERHEAD & PROFIT (CONTOH) 10% 48,347.57


F Harga Satuan Pekerjaan (D+E) 531,823.25

14 F.14 1 m' Turap Kayu Dolken Ø 10YURIFAM


- 12 cm 49,658.32
A TENAGA 9,990.80
L.01 0.0835 OH Pekerja 68,000 5,678.00

L.02 0.0167 OH Tukang 74,000 1,235.80


L.04 0.0084 OH Mandor 84,000 705.60

L.05 0.0167 Oh Operator Crane 74,000 1,235.80


L.06 0.0167 OH Pembantu Operator 68,000 1,135.60
B BAHAN 3,005.63
1.050 m' Kayu Dolken Ø 10 - 12 cm 2,863 3,005.63
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

-
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

C PERALATAN 32,147.50

0.1169 jam Crane 5 - 10 ton 125,000 14,612.50

0.1169 jam Hammer 2 ton 150,000 17,535.00


bh Alat Penyambung tiang pancang 50,000 -
D Jumlah A + B + C 45,143.93
E OVERHEAD & PROFIT (CONTOH) 10% 4,514.39

F Harga Satuan Pekerjaan (D+E) 49,658.32

15 F.15 1 m' Turap Baja Profil Larsen lebar 350 mm 75,484.86


A TENAGA 4,632.60

L.01 0.0345 OH Pekerja 68,000 2,346.00

L.02 0.0069 OH Tukang 74,000 510.60


L.02 0.0069 OH Tukang Listrik 74,000 510.60
L.04 0.0034 OH Mandor 84,000 285.60
L.05 0.0069 Oh Operator Crane 74,000 510.60
L.06 0.0069 OH Pembantu Operator 68,000 469.20
B BAHAN 57,750.00

1.050 m' Turap Baja Profil Larsen lebar 350 mm 55,000 57,750.00
-

C PERALATAN 6,240.00

0.0208 jam Crane 5 - 10 ton 125,000 2,600.00

0.0208 jam Hammer 2 ton 150,000 3,120.00


0.0208 jam Las listrik diesel (termasuk solar) 25,000 520.00
D Jumlah A + B + C 68,622.60

E OVERHEAD & PROFIT (CONTOH) 10% 6,862.26


F Harga Satuan Pekerjaan (D+E) 75,484.86

16 F.16 1 m' Turap Beton Bertulang Precast (12 x 30 cm) 105,848.38


A TENAGA 3,320.80
L.01 0.0280 OH Pekerja 68,000 1,904.00

L.02 0.0056 OH Tukang 74,000 414.40


L.04 0.0028 OH Mandor 74,000 207.20
L.05 0.0056 Oh Operator Crane 74,000 414.40
L.06 0.0056 OH Pembantu Operator 68,000 380.80
B BAHAN 82,400.00

1.0300 m' Beton bertulang precast 80,000 82,400.00

C PERALATAN 10,505.00

0.0382 jam Crane 5 - 10 ton 125,000 4,775.00

0.0382 jam Hammer 1 - 2 ton (manual) 150,000 5,730.00


bh Alat Penyambung Tiang Pancang 50,000 -
D Jumlah A + B + C 96,225.80

E OVERHEAD & PROFIT (CONTOH) 10% 9,622.58


F Harga Satuan Pekerjaan (D+E) 10 105,848.38

17 F.17 1 m' Turap Beton Bertulang Precast (15 x 40 cm) 165,935.66


A TENAGA 4,925.60
L.01 0.0415 OH Pekerja 68,000 2,822.00
L.02 0.0083 OH Tukang 74,000 614.20
L.04 0.0042 OH Mandor 74,000 310.80
L.05 0.0083 Oh Operator Crane 74,000 614.20

L.06 0.0083 OH Pembantu Operator 68,000 564.40


B BAHAN 139,050.00

1.0300 m' Beton bertulang precast 135,000 139,050.00


HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
1 2 3 4 5 6 7 9=4X7

C PERALATAN 6,875.00

0.025 hr Tripod tinggi 5 m' 125,000 3,125.00

0.025 hr Hammer 1 - 2 ton (manual) 150,000 3,750.00


bh Alat Penyambung Tiang Pancang 50,000 -
D Jumlah A + B + C 150,850.60
E OVERHEAD & PROFIT (CONTOH) 10% 15,085.06

F Harga Satuan Pekerjaan (D+E) 165,935.66

18 F.18 1 m' Turap Beton Bertulang Precast (22 x 50 cm) 322,027.20


A TENAGA 8,302.00

L.01 0.0700 OH Pekerja 68,000 4,760.00

L.02 0.0140 OH Tukang 74,000 1,036.00


L.04 0.0070 OH Mandor 74,000 518.00
L.05 0.0140 Oh Operator Crane 74,000 1,036.00
L.06 0.0140 OH Pembantu Operator 68,000 952.00
B BAHAN 257,500.00
1.0300 m' Beton bertulang precast 250,000 257,500.00

C PERALATAN 26,950.00

0.098 hr Tripod tinggi 5 m' 125,000 12,250.00

0.098 hr Hammer 1 - 2 ton (manual) 150,000 14,700.00

bh Alat Penyambung Tiang Pancang 50,000 -


D Jumlah A + B + C 292,752.00
E OVERHEAD & PROFIT (CONTOH) 10% 29,275.20
F Harga Satuan Pekerjaan (D+E) 322,027.20

Anda mungkin juga menyukai