DAFTAR HARGA SATUAN BAHAN,UPAH DAN PERALATAN TAHUN 2016

HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
(Rp)
I DAFTAR BAHAN
1 Angker bolt dia16 KG
2 Pasir Urug M3
3 Pasir Pasang M3
4 Pasir Cor M3
5 Sirtu M3
6 Batu Pecah Mesin 2/3 cm M3
7 Batu Pecah Mesin 1/2 cm M3
8 Batu Pecah Mesin 0.5/1 cm M3
9 Batu Kali 15/20 M3
10 Batu Bata BH
11 Batu alam motif sisir 10 x 20 x 2 M2
12 Besi Polos KG
13 Pengadaan dan pemasangan U-Ditch 200.300.120 (K-350) UNIT
14 Besi WF ≤ 200 mm KG
15 Besi UNP 200 x 70 x 7 x 10 KG
16 Besi UNP 150 x 70 x 6.5 x 10 KG
17 Besi Plat KG
18 Elektroda Baja KG
19 Solar BLN
20 Semen PC KG
21 Semen PC 50 Kg ZAK
22 Semen Warna KG
23 Kayu Kamper Balok M3
24 Kayu Kamper Papan M3
25 Kayu Meranti Reng 2/3 M3
26 Kayu Meranti Reng 2/20 M3
27 Kayu Meranti Usuk 4/6 M3
28 Plywood 9 mm LBR
29 Bambu Bongkotan dia 10-12 cm P.3 m BTG
30 Kayu Gelam 8 - 10 cm BTG
31 gedek guling M2
32 Kawat Beton KG
33 Kertas Gosok LBR
34 Besi Beton KG
35 Paku KG
36 Cat Dasar/Penutup Dinding KG
37 Cat dinding Eksterior KG
38 Cat Waterprofing M2
39 Cat dinding Interior KG
40 Cat Besi/Kayu KG
41 Air bersih LTR
42 Meni Besi KG
43 Plamir KG
44 Minyak Cat LTR
45 Minyak Begesting LTR
46 Multipleks LBR
47 Kansteen M1
48 Keramik 30x30 M2
49 Kloset Jongkok BH
51 Pipa Galvanish 3" + Pengecatan M1
HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
(Rp)
53 Pipa AW 3'' Lonjor
54 Pipa AW 1/4'' M1
55 Klem Pipa Bh
56 Kawat Ayam M2
57 Polycarbonat M2
58 Srub Buah
59 Paving stone 6 cm Warna Abu-abu M2
60 Paving stone 6 cm Warna Merah M2
61 Stopper / Topi Uskup tb. 6 cm M1
62 Stop Kontak BH
63 Plat Strip KG
64 UNP KG
65 Hot Dip Galvanis KG
66 Tangga Besi UNIT
67 Overhead Traveling Crane 10 Ton UNIT
68 Tiang pancang Ø 45 cm M1
69 Tiang pancang Ø 40 cm M1
70 Tiang pancang Ø 30 cm M1
69 Minipile 20x20 M1
70 Pengadaan Flat Sheet Pile M1
71 Genset 5000 KVA + acessories SET
72 Tangki Bulanan 5000 Liter SET
73 Panel Distribusi lengkap AMF & Synchronous 2 x1250 KVA UNIT
74 Penangkal Petir UNIT
75 Panel WLC dan E-prom program UNIT
76 Box Panel uk. 4.800 x 800 x 1.800 mm lengkap UNIT
77 Box Panel uk. 1800 x 800 x 1.800 mm lengkap UNIT
78 ACB 2.000 A 3P / 65 kA Buah
79 MCCB 40 / 3p / 30 kA Buah
80 MCCB 200 A / 3p / 36 kA
81 MCCB 100 A / 3p / 36 kA
82 Voltmeter & SSV Buah
83 Amperemeter Buah
84 CT 2000/5 A Buah
85 UVR/OVR Buah
86 PF Regulator 12 step unit
87 Busbar Buah
88 MCCB 630 - 1600 A 3P / 50 kA Buah
89 MCCB 250-630/36A, 3P Incomming Buah
90 MCCB 175-250/36A, 3P Incomming Buah
91 MCB 6A 3P Buah
92 MCB 2A 1P Buah
93 Lampu Indikator Supply,run, trip. Buah
94 Push button Buah
95 Control Unit Buah
96 Soft Stater 175 kW Buah
97 Soft Stater 75 kW Buah
98 Monitoring Sensor Proteksi Pompa Buah
99 Contactor 400 A Buah
100 Contactor 150 A Buah
101 Contactor 115 A Buah
102 Contactor 225 A
103 Voltmeter & SSV Buah
104 Amperemeter Buah
HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
(Rp)
105 CT 600/5 A Buah
106 Exhaust Fan Buah
107 Auto man switch Buah
108 Relay Buah
109 Water Level Control (WLC) Buah
110 Elektroda Stick Buah
111 Capasitor 50 KVAR/400 V Buah
112 Capasitor 100 KVAR/400 V Buah
113 Fuse Control Buah
114 Panel Pompa Drainage UNIT
115 PP Pompa Sludge(lumpur) (Star/Delta 45 KW) UNIT
116 Pengadaan dan pemasangan panel penerangan UNIT
117 AC 1 PK UNIT
118 Pompa drainage Kapasitas 120m3/menit Total Head 6 m UNIT
119 Panel Control Pompa Banjir UNIT
119 Pompa drainage Kapasitas 120m3/menit Total Head 6 m + UNIT
dengan Panel kontrol+asesorisnya
120 Pompa Sludge Kapasitas 0.25 m3/detik UNIT
121 Pipa Pompa Drainase UNIT
122 Pipa Sludge pump UNIT
123 Pintu Air Semi Otomatis sesuai gambar UNIT
124 Barak Kerja & kantor Lapangan Bln
125 Filling Cabinet (1 bh ) Bln
126 3 Meja Kerja 1,2 x 2,4 + 2 Kursi Bln
127 Meja Rapat (1 bh ) Bln
128 Kursi Lipat ( 3 bh ) Bln
129 White Board Dan Papan Tempel Bln
130 Rak Arsip Terbuka Bln
131 Papan Nama Proyek Ls
132 Solar liter
133 Incoming Panel Sisi Pelanggan Unit
134 Outgoing Panel Sisi Pelanggan Unit
135 Grounding BC 50 untuk trafo Ls
136 Pengadaan dan pemasangan AC (1 Pk) Unit
137 MCB 3P 10 A/10 KA, bh
138 MCB 3P 16 A/10 KA, bh
139 MCB 3P 20 A/15 KA, bh
140 MCB 1P 4 A + Terminal bh
141 Pilot Lamp + fuse 2 A bh
142 Grounding System lot
143 Wiring Connection lot
144 Box Panel 600x800x200 bh
145 Cubbicle Sisi Pelanggan ( Incoming + Outgoing ) Set
Relay OCR, GDR, EF Lengkap dengan asesorisnya
144 Material Bantu lot
145 Timer bh
146 Kontaktor lot
147 Relay lot
148 Panel Capasitor Bank UNIT
149 Sheet Metal 10 mm Kolom kg
150 Potong,Bor dan mal plat 10 mm lot
151 las lot
152 hot deep galvanish\ kg
153 rolling plate kg
HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
(Rp)
154 Bahan Bantu kontruksi dan aksesories pipa %
155 Kabel NYY 1 x 240 mm2 M1
155 Kabel NYY 1 x 185 mm2 M1
155 Kabel NYY 4 x 185 mm2 M1
156 Kabel NYY 4 x 95 mm2 M1
157 Kabel NYY 4 x 2,5 mm2 M1
158 Junction Box Tipe Out Door Unit
159 Terminal Block Unit
160 Kabel N2XSY 3x1x70 mm M1
161 Terminasi Kabel Kit N2XSY 70 mm M1
162 Kabel NYY 1x300 mm M1
163 Kabel NYY 2x3x1x300 mm M1
164 Kabel Ladder 400x100x2.400 mm M1
165 Lampu Balk TL 2x36 W m1
165 Pemasangan Lampu 150 W Lengkap Armatur Balast Ignitor UNIT
166 Tiang Otagonal 6M Cabang 2 Hot Dipped Galvanized Dg Flenders
TITIK
167 Saklar Seri M1
168 Kabel NYY 4 x 2,5 mm2 mtr
169 Pipa kond. Dia 20 mm mtr
170 Pemasangan Boven Grill Dinding M2
171 Pasang Pintu Harmonika M2
172 Pengadaan Dan Pemasangan Pintu Besi Unit
173 Kabel Exiting Genzet Ke Panel Existing M1
174 Sok bh
175 T dos bh
176 Klem + fisher bh
177 Isolasi / lasdop ls
178 Upah / jasa tes tekan kubus 15 cm x 15 xm Bh
179 Upah / jasa tes tarik baja Bh
180 Triplek Uk. 122 x 244 x 12 mm Lmbr
181 Kayu Meranti Kaso 5/7 M3
182 Besi Angkur Ø 10 Kg
183 Banner 110 x 90 M2
184 Paving Stone Full Warna Merah tb. 6 cm ( 4 persegi pj. ) M2
185 COS 4P 2000A Buah
186 ACB 3P 3200A Buah
186 ACB 3P 2000A Buah
188 MCCB 400A/ 36 kA Buah
189 MCCB 160A/ 36 kA Buah
190 MCB 20A/ 6 kA Buah
191 Pilot Lamp + Fuse Buah
192 Voltmeter 0 - 500V Buah
193 Amperemeter 0 - 1000A Buah
194 Selector Voltage Buah
195 Selector A-O-M Buah
196 CT 2000A/5A Buah
197 Box panel 1200x800x1800mm (pxtxl) Buah
198 Wiring + Aksessoris Ls
199 Cubicle Incomming 1250 A UNIT
200 MCCB 750A/ 36 kA bh
200 MCCB 630A/ 36 kA bh
201 Softstarter unit
202 Pilot Lamp + Fuse bh
203 Voltmeter 0 - 1000V bh
HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
(Rp)
204 Amperemeter 0 - 1000A bh
205 Selector Voltage bh
206 Selector A-O-M bh
207 CT 1000A/5A bh
208 Control WLC unit
209 Modul Control Pompa Utama unit
210 Modul Control Pompa 2 unit
211 Control System Full unit
212 material bantu control panel unit
213 Wiring + Aksessoris -P.Control Pompa Banjir ls
214 Box panel Control Pompa Type Free standing bh
215 Junction Box bh
216 Pengecatan Kayu Ls
217 Dolken kayu Gelam 8-10/400 cm batang
218 Semen portland (40 kg) zak
219 Seng gel BJLS 30 uk. (80cmx180cm) lembar
220 Kayu Meranti Kaso 5/7 m3
221 Paku Asbes kg
222 Cat Meni Besi Kg
223 Bambu Ori Dia 8-12 p.3 m Batang
224 Gedeg Guling M2
225 Kawat Ikat Beton KG

NO URAIAN SATUAN

II HARGA UPAH
1 Mandor ORG/HR
2 Pembantu Tukang ORG/HR
3 Pembantu Tukang ORG/HR
4 Kepala Tukang Kayu ORG/HR
5 Kepala Tukang Batu ORG/HR
6 Kepala Tukang Besi ORG/HR
7 Kepala Tukang Listrik ORG/HR
8 Tukang Kayu ORG/HR
9 Tukang Batu ORG/HR
10 Tukang Besi ORG/HR
11 Tukang Listrik ORG/HR
12 Tukang Gali ORG/HR
13 Mekanik ORG/HR
14 Operator ORG/HR
15 Pembantu operator ORG/HR
16 Sopir ORG/HR
17 Pembantu sopir ORG/HR
18 Tenaga Ahli Elektrikal ORG/HR
19 Tenaga Ahli Mekanilkal ORG/HR
20 Ongkos kerja kontruksi ORG/HR
21 Ongkos kerja mesin ORG/HR
22 Ongkos Kerja pasang ORG/HR
23 Juru Ukur ORG/HR
24 SLO (Sertifikat Layak Operasi) Kva
25 Biaya Penyambungan PLN untuk Tegangan Menengah Kva
26 Uang Jaminan Pelanggan Kva
27 Pemindahan Genzet Existing Ls
HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
(Rp)
III PERALATAN
1 Concrete Mixer 0.50 m³ JAM
2 Concrete Vibrator JAM
3 Crane JAM
4 Chain Hoist JAM
5 Sewa Magger (Min 1 hari) Hari
6 Sewa Multitester (Min 1 hari) Hari
7 Sewa Tang Ampere (Min 1 hari) Hari
8 Test Tekan Hidrostatik Hari
9 Test X-Ray/Uji sambungan Hari
10 Mesin Bor JAM
11 Vibro hammer JAM
12 Drop hammer JAM
13 Jack Hammer JAM
14 Sewa Hammer tiang pancang JAM
15 Ponton JAM
16 Excavator JAM
17 Vibro Roller JAM
18 Bulldozer JAM
19 Sewa Pompa Air Unit
20 Sewa Trailer Rit
21 Sewa Truck Rit
22 Sewa Sheet pile 6 m BLN
23 Sewa Pompa Air JAM
24 Sewa Pompa Air HR
24 Sewa Pompa Air Ls
25 Crane Pancang JAM
26 Crane Service JAM
27 Sewa mesin Hidraulic Pile Injection min 8 jam JAM
28 Crane 50 Ton JAM
29 Stamper JAM
30 Forklift JAM
31 Alat Bantu JAM
32 Alat Bantu (Pek.Listrik) JAM
33 Sewa Alat Bantu JAM
34 Sewa motor grader 125-140 PK ( min. 5 jam ) JAM
35 Sewa truk tangki air ( min. 5 jam ) JAM
36 Sewa walles ( min. 5 jam ) JAM
37 Wheel Loader JAM
38 Compressor JAM
39 Dump Truk JAM
40 Trafo 2000 kVA unit
41 Testing Commisioning Ls
42 LP Area Lighting UNIT
43 Acesssories Ls
44 Generator Set ( Genset ) JAM
45 Sewa Theodolit HR
46 Steel Sheet Pile 12 m BLN
47 Sewa Welding Set (min 5 jam) JAM
48 Mobilisasi & Demobilisasi Genset Penerangan Ls
49 Mobilisasi & Demobilisasi Pekerja Ls