Nama Toko :
Hari / Tgl :
Lokasi :
1 2 3 4
BAHAN MATERIAL LOKAL
1 Batu Gunung M3
2 Pasir Pasangan M3
3 Batu Kerikil M3
4 BAHAN MATERIAL KAYU
5 Kayu Klas I Wola
6 Balok M3
7 Papan M3
8 Kayu Klas II Kia M3
9 Balok M3
10 Papan M3
11 List Kayu Profil M'
12 BAHAN MATERIAL TOKO
13 Semen 50 Kg kg
14 Semen Nat/Warna Kg
15 Atap Seng Gelombang Warna Lbr
16 Baut Angkur + Mur 10 Cm Bh
17 Baut Angkur + Mur Ø 12 mm Bh
18 Baut Angkur + Mur Ø 20 mm Bh
19 Pek.Besi Siku L. 50.50.5 M'
20 Besi Plat Lbr
21 Besi Plat Lbr
22 Besi Plat Lbr
23 Besi Siku L 5/5 cm M'
24 Besi Strip Kuda - Kuda Tebal 5 mm Kg
25 Besi Hollow Btg
26 Besi Hollow Btg
27 Besi Hollow Btg
28 Besi Q 6 Btg
29 Besi Q 8 Btg
30 Besi Q 10 Btg
31 Besi Q 12 Btg
32 Seng Spandek Lbr
33 Alkopan CM
34 Batu Alam M2
35 Batu Alam M2
36 Batu Alam M2
37 Batu Alam M2
38 Tegel 60x60 cm Dos
39 Tegel 40x40 cm Dos
40 Kawat Las Kg
41 Seng Plat 90 cm M'
42 Atap Genteng Metal Lbr
43 Kabel NYM 2 x 1.5 SQMM (1 Roll 50 Meter) M1
44 Fitting Lampu Bh
45 Stop Kontak 4 Lubang Bh
46 Lampu Lampusl 5 wat Philips Bh
47 Lampu Lampusl 23 wat Philips Bh
48 Lampu Neon Philips 1 meter Bh
49 Paving Block M2
50 Saklar Bh
BAHAN MATERIAL PAKU
1 Paku Campur Kg
2 Paku Seng Kg
BAHAN MATERIAL CAT
1 Cat Kayu Avian Kg
2 Dempul Kayu Kg
3 Kuas 3 '' Buah
4 Minyak Cat Kg
5 Ter Kg
6 Cat Kayu Mowilex Kg
7 Amplas kayu Lbr
8 Lem Fox Kg
Di buat
KONTRAKTOR PELAKSANA
CV. RAMBANGA KONSTRUKSI
Pusat Baubau
LA ODE ENDANG, ST
Direktur
PEKERJAAN PASIR URUG
PEKERJAAN paving
Panjang Lebar Luas M2 M3
l Seg I 11.5 6 34.5
l Seg II 11.1 5.66 31.413
Jalur Bendera 7.2 1.7 12.24
Paving Seg I 5 1 5
Paving Jalur tengah 30 2 60
Paving Tengah 33.05 3.7 122.285
Lapangan Upacara 1 7.92 4.81 38.0952
Lapangan Upacara 2 35.18 5 175.9
Lapangan Upacara 3 8 4.94 39.52
518.88
PEKERJAAN CASTEIN
Lebar Tinggi Luas M2 Panjang M3
ukuran kastein 0.15 0.2 0.03 171.7 5.151
PEKERJAAN LANTAI
Panjang Lebar Banyak M3
Lantai Kerja
Beton Pracetak 1 0.5 0.07 30 1.05
Lapangan Upacara 23.3 7.32 0.07 170.556 11.93892
7.32 1.1 0.07 8.052 0.56364
13.55256
Kastein 34.34
Pondasi Lama 52.57
86.91
85255904285
17.57
23.61 17
41.18
5.796
11.958
14.156 20.745
0.075
0
#REF!
15
170.556
8.052
193.608
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : Pembangunan Sarana Dan Prasarana Gedung Kantor Sekretariat Daerah Kota Baubau
Pekerjaan : Perencanaan Penataan Halaman Kantor Kecamatan Sorawolio
Volume : 880 m2
Lokasi : Kota Baubau
T. Anggaran : 2018
HARGA SATUAN
NO ANL. URAIAN PEKERJAAN SAT VOLUME JUMLAH (Rp.)
(Rp.)
1 2 3 4 5 6 7 =(5 x 6)
A PEKERJAAN PERSIAPAN
1 Pembersihan Lahan Awal dan Akhir Ls 1.00 1,600,000.00 1,600,000.00
2 Pembongkaran Ls 1.00 3,000,000.00 3,000,000.00
3 Pembuatan Papan Kegiatan Ls 1.00 300,000.00 300,000.00
4 Penyedian Air Kerja Ls 1.00 1,000,000.00 1,000,000.00
5 Administrasi, Dokumentasi dan P3K Ls 1.00 500,000.00 500,000.00
Sub Total A (Masuk Pada Rekapitulasi Perkiraan Harga) Sub Total 6,400,000.00
B PEKERJAAN PENATAAN TAMAN
1 A.2.3.1.11. Pek. Urugan Pasir M3 8.93 547,285.00 4,887,473.96
2 A.3.2.1.3. Pek. Castein 1 SP:5 PP M3 5.15 1,104,595.70 5,689,772.45
3 B.01 Pek. Rabat Beton 1:3:5 T 7 cm M3 13.55 1,236,654.80 16,759,838.38
4 SNI T.o2 Pek. Pas. Paving Block M2 518.88 210,691.50 109,323,226.28
5 A.4.7.1.11. Pek. Cat Castein + Pondasi & Pagar Eksiting Ls 1.00 12,000,000.00 12,000,000.00
6 Pek. Bangku Taman Ls 4.00 2,500,000.00 10,000,000.00
7 Pengadaan. Pot Bunga Bh 4.00 600,000.00 2,400,000.00
8 A.2.3.1.14. Pek. Tanah Humus M3 5.40 168,762.50 912,026.30
9 Penanaman Rumput Jepang M2 47.10 50,000.00 2,355,000.00
10 - Pengadaan Bunga Anthurium G. Cinta(100 Cm) Pohon 4.00 500,000.00 2,000,000.00
Sub Total C (Masuk Pada Rekapitulasi Perkiraan Harga) Sub Total 166,327,337.37
TOTAL 172,727,337.37
REKAPITULASI
Kegiatan : Pembangunan Sarana Dan Prasarana Gedung Kantor Sekretariat Daerah Kota Baubau
Pekerjaan : Perencanaan Penataan Halaman Kantor Kecamatan Sorawolio
Volume : 880 m2
Lokasi : Kota Baubau
T. Anggaran : 2018
1 2 3
9
Mengetahui:
Disetujui Di buat
PEJABAT PEMBUAT KOMITMEN (PPK) KONSULTAN PERENCANA
SEKRETARIAT DAERAH KOTA BAUBAU CV. ACCES CONSULTAN
#REF! Pusat Baubau
Kegiatan : Pembangunan Sarana Dan Prasarana Gedung Kantor Sekretariat Daerah Kota Baubau
Pekerjaan : Perencanaan Penataan Halaman Kantor Kecamatan Sorawolio
Volume : 880 m2
Lokasi : Kota Baubau
T. Anggaran : 2018
1 2 3 4
HARGA SATUAN UPAH
1 Kepala Tukang OH 150,000.00
2 Mandor OH 120,000.00
3 Pekerja OH 95,000.00
4 Tukang Batu OH 140,000.00
5 Tukang Kayu OH 140,000.00
6 Tukang Besi OH 140,000.00
7 Tukang Las OH 140,000.00
8 Tukang Cat OH 140,000.00
BAHAN MATERIAL LOKAL
1 Batu Gunung M3 250,000.00
2 Tanah Timbunan M3 70,000.00
3 Tanah Humus M3 100,000.00
4 Pasir M3 372,000.00
5 Batu Kerikil M3 450,000.00
6 Bata Merah Bh 1,000.00
BAHAN MATERIAL KAYU
1 Papan Kayu Kelas I M3 5,500,000.00
2 Balok Kayu Kelas I M3 5,000,000.00
TANAMAN BUNGA
1 Rumput jepang M2 50,000.00
2 Anthurium Gelombang Cinta Pohon 500,000.00
3 Melati Mini (Rambusa 40 Cm) Pohon 50,000.00
BAHAN MATERIAL TOKO
1 Semen 50 Kg kg 1,400.00
2 Semen Nat/Warna Kg 15,000.00
3 Paving Block M2 80,000.00
Di buat
KONSULTAN PERENCANA
CV. ACCES CONSLUTAN
Pusat Baubau
La Ode Herman, ST
Direktur
PERENCANAAN TEKNIS PEMBANGUNAN BARUGA DI KELURAHAN LIABUKU
LEMBAR ASISTENSI
NAMA / NIP :
JABATAN :
1
ENGINEER ESTIMATE (EE)
DAFTAR ANALISA BIAYA KONSTRUKSI
Kegiatan : Pembangunan Sarana Dan Prasarana Gedung Kantor Sekretariat Daerah Kota Baubau
Pekerjaan : Perencanaan Penataan Halaman Kantor Kecamatan Sorawolio
Volume : 880 m2
Lokasi : Kota Baubau
T. Anggaran : 2018
A TENAGA
Pekerja OH 0.300 95,000.00
Tukang Batu OH 0.150 140,000.00
Kepala Tukang OH 0.015 150,000.00
Mandor OH 0.015 120,000.00
JUMLAH UPAH KERJA
B BAHAN
Semen Portland Kg 6.240 1,400.00
Pasir Pasang M3 0.024 372,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja OH 0.200 95,000.00
Tukang Batu OH 0.100 140,000.00
Kepala Tukang OH 0.010 150,000.00
Mandor OH 0.010 120,000.00
JUMLAH UPAH KERJA
B BAHAN
Semen PC Kg 3.250 1,400.00
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja OH 0.300 95,000.00
Tukang Batu OH 0.100 140,000.00
Kepala Tukang OH 0.010 150,000.00
Mandor OH 0.015 120,000.00
JUMLAH UPAH KERJA
B BAHAN
Bata Merah Bh 70.000 1,000.00
Semen Portlan Kg 11.500 1,400.00
Pasir Pasang M3 0.043 372,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja OH 0.150 95,000.00
Tukang Batu OH 0.200 140,000.00
Kepala Tukang OH 0.200 150,000.00
Mandor OH 0.010 120,000.00
JUMLAH UPAH KERJA
B BAHAN
Paving Block M2 1.000 80,000.00
Pasir Pasang M3 0.080 372,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja OH 5.300 95,000.00
Tukang Batu OH 0.275 140,000.00
Tukang Kayu OH 1.300 140,000.00
Tukang Besi 1.050 140,000.00
Kepala Tukang OH 0.262 150,000.00
Mandor OH 0.265 120,000.00
JUMLAH UPAH KERJA
B BAHAN
Kayu Kelas III M3 0.200 1,500,000.00
Paku 5 cm - 12 cm Kg 1.500 35,000.00
Minyak Bekisting Liter 0.400 15,000.00
Besi Beton Polos Kg 157.500 11,000.00
Kawat Beton Kg 2.250 15,000.00
Semen Portland Kg 336.000 1,400.00
Pasir Beton M3 0.540 372,000.00
Kerikil M3 0.810 450,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A UPAH
Pekerja OH 0.028 95,000.00
Tukang Cat OH 0.420 140,000.00
Kepala Tukang OH 0.0042 150,000.00
Mandor OH 0.003 120,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat Dasar Kg 0.12 50,000.00
Cat Penutup Kg 0.18 100,000.00
Kuas Bh 0.01 10,000.00
JUMLAH HARGA BAHAN
C Jumlah (A+B+C)
D Overhead & Profit 15% x D
E Harga Satuan Pekerjaan (D+E)
Daerah Kota Baubau
JUMLAH HARGA
SATUAN (Rp)
142,500.00
15,000.00
157,500.00
-
-
-
-
157,500.00
23,625.00
181,125.00
JUMLAH HARGA
SATUAN (Rp)
28,500.00
1,000.00
29,500.00
446,400.00
446,400.00
-
-
475,900.00
71,385.00
547,285.00
JUMLAH HARGA
SATUAN (Rp)
23,750.00
3,000.00
26,750.00
84,000.00
84,000.00
-
-
110,750.00
16,612.50
127,362.50
JUMLAH HARGA
SATUAN (Rp)
23,750.00
3,000.00
26,750.00
120,000.00
120,000.00
-
-
146,750.00
22,012.50
168,762.50
JUMLAH HARGA
SATUAN (Rp)
142,500.00
105,000.00
11,250.00
9,000.00
267,750.00
190,400.00
202,368.00
300,000.00
692,768.00
-
-
960,518.00
144,077.70
1,104,595.70
JUMLAH HARGA
SATUAN (Rp)
95,000.00
70,000.00
7,500.00
12,000.00
184,500.00
300,000.00
300,000.00
-
-
484,500.00
72,675.00
557,175.00
NG
JUMLAH HARGA
SATUAN (Rp)
125,400.00
30,800.00
3,300.00
15,840.00
175,340.00
333,000.00
336,000.00
231,012.00
-
900,012.00
-
-
1,075,352.00
161,302.80
1,236,654.80
JUMLAH HARGA
SATUAN (Rp)
28,500.00
21,000.00
2,250.00
1,800.00
53,550.00
8,736.00
8,928.00
17,664.00
71,214.00
10,682.10
81,896.10
JUMLAH HARGA
SATUAN (Rp)
19,000.00
14,000.00
1,500.00
1,200.00
35,700.00
4,550.00
4,550.00
-
-
40,250.00
6,037.50
46,287.50
JUMLAH HARGA
SATUAN (Rp)
28,500.00
14,000.00
1,500.00
1,800.00
45,800.00
70,000.00
16,100.00
15,996.00
102,096.00
-
-
147,896.00
22,184.40
170,080.40
JUMLAH HARGA
SATUAN (Rp)
14,250.00
28,000.00
30,000.00
1,200.00
73,450.00
80,000.00
29,760.00
109,760.00
-
-
183,210.00
27,481.50
210,691.50
JUMLAH HARGA
SATUAN (Rp)
503,500.00
38,500.00
182,000.00
147,000.00
39,300.00
31,800.00
942,100.00
300,000.00
52,500.00
6,000.00
1,732,500.00
33,750.00
470,400.00
200,880.00
364,500.00
3,160,530.00
-
-
4,102,630.00
615,394.50
4,718,024.50
JUMLAH HARGA
SATUAN (Rp)
2,660.00
58,800.00
630.00
360.00
62,450.00
6,000.00
18,000.00
100.00
24,100.00
86,550.00
12,982.50
99,532.50
NO ITEM PEKERAAN PANJANG LEBAR TINGGI VOLUME
3 PAS.BATU BATA
TAMAN 98 0.3 29.4
PELINDUNG PIPA 6 1.1 7 46.2
SALURAN 120 0.1 12
87.6
4 PLESTERAN
TAMAN 98 0.3 29.4
PELINDUNG PIPA 6 1.1 7 46.2
SALURAN 120 0.1 12
87.6
5 ACIAN
TAMAN 98 0.3 29.4
PELINDUNG PIPA 6 1.1 7 46.2
SALURAN 120 0.1 12
87.6
6 TIMBUNAN
TAMAN 45 0.8 0.2 7.2
SALURAN 120 0.8 0.3 28.8
PIPA 3 '' 6 3 18
PIPA 2 '' 6 4 24
68 0.3 20.4
68 0.3 20.4
68 0.3 20.4
PENGADAAN LANGSUNG
Nomor : 05/UND/PL /12/IV/ Lapas Baubau/201
Tanggal : 11 APRIL 2016
SUMBER DANA : D1PA KANTOR WILAYAH SULTRA LAPAS KELAS II BAUBAU TAHUN
ANGGARAN 2016
WAKTU PELAKSANAAN PEKERJAAN: 20 (Dua Puluh) hari kalender sejak diterbitkannya SPK
ini.(terhitung mulai tanggal 11 April 2016 sampai dengan tanggal 30 April 2016)
NILAI PEKERJAAN
Rp. 196.500.000,-
(Seratus Sembilan Puluh Enam Juta Lima Ratus Ribu Rupiah)
ini.(terhitung mulai tanggal 11 April 2016 sampai dengan tanggal 30 April 2016)
HARGA SATUAN
NO ANL. URAIAN PEKERJAAN SAT VOLUME
(Rp.)
1 2 3 4 5 6
A PEKERJAAN PERSIAPAN
1 Administrasi dan Dokumentasi Ls 1.00 1,500,000.00
2 Pengukuran dan pemas.Bowplank Ls 1.00 2,000,000.00
Sub Total A (Masuk Pada Rekapitulasi Perkiraan Harga) Sub Total
B PEKERAAN TAMAN
1 T.06 Pek. Galian Tanah M3 11.76 181,125.00
2 Err:509 Pek.Pas. Batu gunung M3 9.80 Err:509
3 Err:509 Pek.Pas.Batu Bata Camp 1 : 4 M2 49.80 Err:509
4 Err:509 Pek. Plesteran M2 49.80 Err:509
5 Err:509 Pek. Acian M2 49.80 Err:509
6 Err:509 Pek.Tanah Timbunan M3 12.00 Err:509
7 Err:509 Pek.Tanah Humus M3 6.00 Err:509
8 Aksesoris Taman Ls 1.00 5,000,000.00
Sub Total B (Masuk Pada Rekapitulasi Perkiraan Harga) Sub Total
C PEKERJAAN SANITASI
1 Err:509 Pek.Pas.Batu Bata Camp 1 : 4 M2 58.20 Err:509
2 Err:509 Pek. Plesteran M2 58.20 Err:509
3 Err:509 Pek. Acian M2 58.20 Err:509
4 Err:509 Pek.Tanah Timbunan M2 28.80 Err:509
5 Err:509 Pek.Plat Beton Penutup Saluran Camp. 1:2:3 M3 7.47 Err:509
6 Err:509 Pek. Rabat Beton M3 46.80 Err:509
Err:509 Pemas.Pipa PVC 2 '' M' 12.00 Err:509
7 Err:509 Pemas.Pipa PVC 2,5 '' M' 18.00 Err:509
Err:509 Pemas.Pipa PVC 3 '' M' 24.00 Err:509
Sub Total C (Masuk Pada Rekapitulasi Perkiraan Harga) Sub Total
D PEK. REHAB. ATAP & PLAFOND
1 Err:509 Pek Pembongkaran Atap M2 150.00 Err:509
2 Err:509 Pek.Gording Atap M3 0.50 Err:509
3 Err:509 Pemasangan Atap Genteng Metal M2 150.00 Err:509
4 Err:509 Pemasangan Karpet Talang Jurai Atap M' 34.00 Err:509
5 Err:509 Pek.Lisplank M' 18.00 Err:509
6 Err:509 Pek Rangka Plafond M2 45.00 Err:509
7 Err:509 Pek. Plafond M2 45.00 Err:509
8 Err:509 Pek. List Plafond M' 36.00 Err:509
Sub Total D (Masuk Pada Rekapitulasi Perkiraan Harga) Sub Total
E PEKERJAAN PENGECETAN
1 Err:509 Pek. Pengecetan Dinding M2 132.60 Err:509
2 Err:509 Pek. Pengecetan Lisplank M2 36.00 Err:509
3 4.7.1.41 Pek. Pengecetan Plafond M2 45.00 Err:509
4 Pek. Pembersihan Akhir Ls 1.00 2,000,000.00
Sub Total E (Masuk Pada Rekapitulasi Perkiraan Harga) Sub Total
TOTAL (A)
PPN (10 % x A) (B) Rp
TOTAL COST (A + B) (C) Rp
DIBULATKAN (D) Rp
Terbilang : "Seratus Sembilan Puluh Enam Juta Lima Ratus Ribu Rupiah"
INSTRUKSI KEPADA PENYEDIA : Penagihan hanya dapat dilakukan setelah penyelesaian pekerja
yang diperintahkan dalam SPK ini dan dibuktikan dengan Berita Acara Serah Terima. Jika pekerjaan
dapat diselesaikan dalam jangka waktu pelaksanaan pekerjaan karena kesalahan atau kelalaian Penye
maka Penyedia berkewajiban untuk membayar denda kepada PPK sebesar 1/1000 (satu per seribu) d
sisa harga bagian kontrak yang belum di kerjakan , apabila bagian pekerajaan yang sudah di laksanak
dapat berfungsi
Selain Tunduk kepada ketentuan dalam SPK ini, Penyedia berkewajiban untuk memenuhi syarat umu
SPK Terlampir
DARMAWAN, SH SUSWORO
Nip: 198300125200312 1 001 Direktur
KANTOR WILAYAH SULAWESI TENGGARA LEMBAGA
PEMASYARAKATAN KLAS II A BAUBAU
W25.E2.PL.01.01-2013
11-Apr-16
05/UND/PL/12/IV/Lapas baubau/2016
1-Apr-16
PENGADAAN LANGSUNG
Nomor : 05/UND/PL /12/IV/ Lapas Baubau/2016
Tanggal : 11 APRIL 2016
WILAYAH SULTRA LAPAS KELAS II BAUBAU TAHUN
ANGGARAN 2016
JUMLAH (Rp.)
7 =(5 x 6)
1,500,000.00
2,000,000.00
3,500,000.00
2,130,030.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
5,000,000.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2,000,000.00
Err:509
Err:509
Err:509
Err:509
Err:509
SUSWORO
Direktur