KEBUTUHAN MATERIAL

PROYEK : PERUMAHAN BEVERLY HILL RESIDENCE


PEKERJAAN : RUMAH TINGGAL TYPE 36
LOKASI : JALAN PERDANA, PONTIANAK

NO URAIAN PEKERJAAN

A PEKERJAAN PERSIAPAN
1 Bouplank & Pengukuran
- Kayu Pancang (Dolken) d = 6-8 cm, p = 4m
- Paku
- Papan Kayu Kelas III

B PEKERJAAN PONDASI
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pondasi Setempat
- Beton Cam K 225
Semen Portland
Pasir
Batu pecah 1-2 cm (Kerikil)
- Pembesian
- Bekisting
Kayu Kelas III
Paku 2" - 5"
Minyak Bekisting
- Cerucuk Dia. 9 - 12 Panjang = 12 m

C PEKERJAAN PASANGAN & BETON


1 Pasang Dinding Batu Bata
Batako 20/40/7 (cetak mesin)
Semen Portland
Pasir Beton / Pasang
2 Plester Dinding
Semen Portland
Pasir
3 Acian
Semen Portland
4 Beton Sloof 15/30
- Beton Cam K 225
Semen Portland
Pasir
Batu pecah 1-2 cm (Kerikil)
- Pembesian
- Bekisting
Kayu Kelas III
Paku 2" - 5"
Minyak Bekisting
5 Beton Kolom Praktis 10/15
- Beton Cam K 225
Semen Portland
Pasir
Batu pecah 1-2 cm (Kerikil)
- Pembesian
- Bekisting
Kayu Kelas III
Paku 2" - 5"
Minyak Bekisting
Papan Mal
Cerucuk Ǿ 6 - 8cm / 4m
6 Beton Ring Balok
- Beton Cam K 225
Semen Portland
Pasir
Batu pecah 1-2 cm (Kerikil)
- Pembesian
- Bekisting
Paku 2" - 5"
Balok Kayu Kelas III
Papan Mal
Paku 2" - 5"
7 Plat Lantai
- Beton Cam K 225
Semen Portland
Pasir
Batu pecah 1-2 cm (Kerikil)

D PEKERJAAN KAYU KOZEN


1 Kozen Pintu Jendela Bengkirai
- P1 3 unit
- P2 2 unit
- PJ1 1 unit
- PJ2 1 unit
2 Kozen Jendela Almunium
- J1 1 unit
- J2 1 unit
3 Kozen Ventilasi Almunium
- V1 2 unit
- V2 1 unit
4 Pintu Untuk WC Bengkirai
5 Daun Pintu Bengkirai
- P1
- PJ1
- PJ2
6 Kaca 5 mm Polos
- PJ1 1 unit
- PJ2 1 unit
- P1 3 unit
- J1 1 unit
J2 1 unit
- V1 2 unit
- V2 1 unit
7 Engsel Pintu
8 Engsel Jendela
9 Kunci Pintu
10 Slot Jendela
E PEKERJAAN ATAP & PLAFOND
1 Rangka Atap Baja Ringan+ Atap Type Stone +Pasang
2 Rangka Plafond Hollow 4/4 + Papan Gypsum
Hollow 4/4
Sekrup Gypsum 3 "
Gerinda
Papan Gypsum
3 Plafond GRC Board
GRC Board
4 Listplank Kayu Kls. II
Papan Kayu Kelas II (Ketam)
Paku

F PEKERJAAN SANITASI
1 Bak Mandi Fibreglass
2 Kloset Jongkok pembantu unt kamar pembantu & tamu
3 Kloset duduk monoblok tipe 660 utk master room
3 Kran Air
4 Instalasi Air Kotor & Air Bersih
- Saluran Air Bersih PVC 3/4 "
- Saluran Air Kotor PVC 4'
5 Septictank Ps. Batako
- Pasangan Batu Bata
Batako 20/40/7 (cetak mesin)
Semen Portland
Pasir Beton / Pasang
- Plesteran
Semen Portland
Pasir
6 Grountank Kaps (2x3x1.5)

G PEKERJAAN INSTALASI LISTRIK


1 Penyambungan Listrik PLN 2200 watt
2 Pemasangan Instalasi Listrik
3 Pemasangan Lampu SL 25 Watt
4 Pemasangan Lampu Spot Light
5 Pemasangan Sekering Group
6 Pemasangan Stop Kontak
7 Pemasangan Sakelar Tunggal
8 Pemasangan Sakelar Ganda
H PEKERJAAN LANTAI & PENGECATAN
1 Lantai Keramik 60/60
Keramik 60x 60 cm
Semen
Pasir Pasang
Oker Pengisi Nat Keramik
2 Lantai WC Keramik 20/20
Ubin keramik
Portland Cement (PC)
Pasir Pasang
Semen Warna
3 Dinding WC Keramik 20/50
Keramik 20 x 50 cm
Semen
Pasir Pasang
Oker Pengisi Nat Keramik
4 Lantai Teras Keramik 60 x 60
Keramik 60x 60 cm
Semen
Pasir Pasang
Oker Pengisi Nat Keramik
5 Cat Dinding & Kanopi
Plamur (dempul tembok)
Cat Dasar tembok
Cat Tembok Penutup 2 x
6 Cat Plafond
7 Cat Pintu & Jendela
Cat Meni
Dempul
Cat Dasar
Cat Kilat Penutup 2 Kali
8 Cat Listplang
Cat Meni
Dempul
Cat Dasar
Cat Kilat Penutup 2 Kali

I LAIN - LAIN
1 Lantai Carport Rabat Beton uk. L 3.5m x P 5m
UHAN MATERIAL

VOL SAT

38.00 m1
19.00 Btg
0.76 Kg
0.27 M3

3.28 m3
1.64 m³

1.02 m³
327.60 Kg
716.63 Kg
1126.13 Kg
96.66 kg
1.25 m²
0.05 M3
0.37 Kg
0.12 Lt
52.00 btg

106.00 m2
1325.00 Bh
795.00 Kg
2.86 M3
Err:509 m2
Kg
M3
Err:509 m²
kg

1.93 m³
617.60 Kg
1351.00 Kg
2123.00 Kg
135.75 Kg
6.40 m²
0.29 M3
0.09 Kg
0.01 Lt

0.47 m³
151.20 Kg
330.75 Kg
519.75 Kg
93.44 kg
2.36 m²
1.56 M3
0.78 Kg
0.08 Lt
0.05 M3
4.73 Btg
0.66 m³
209.95 Kg
459.27 Kg
721.71 Kg
129.70 kg
3.21 m²
1.28 Kg
0.06 M3
0.07 M3
6.41 Btg

3.31 m³
1058.05 Kg
2314.48 Kg
3637.04 Kg

2.30 m²
1.47 m²
6.42 m²
4.73 m²

8.61 m¹
7.90 m¹

2.10 m¹
6.40 m¹
2.00 buah

3.00 unit
1.00 unit
1.00 unit

1.67 m²
1.03 m²
0.18 m²
1.81 m²
1.68 m²
0.21 m²
0.74 m²
24.00 buah
8.00 buah
7.00 buah
4.00 buah
75.00 m²
Err:509 m²
btg
bh
bh
Kpg
Err:509 m²
Kpg
Err:509 m1
M3
Kg

2.00 buah
2.00 buah
1.00 buah
2.00 buah

22.70 m¹
3.40 m¹

12.00 m²
150.00 Bh
90.00 Kg
0.32 M3
12.00 m²
93.31 Kg
0.28 M3
1.00 Ls

1.00 Ls
32.00 ttk
15.00 Bh
1.00 Bh
1.00 Bh
7.00 Bh
4.00 Bh
4.00 Bh
33.00 m²
99.00 Bh
375.54 Kg
1.39 M3
4.95 Kg
9.00 m²
238.50 Bh
93.60 Kg
0.41 M3
1.46 Kg
Err:509 m²
Bh
Kg
M3
Kg
Err:509 m²
Bh
Kg
M3
Kg
Err:509 m²
Kg
Kg
Kg
Err:509 m²
Err:509 m²
Kg
Kg
Kg
Kg
Err:509 m1
Kg
Kg
Kg
Kg

17.50 m2
REKAPITULASI ANGARAN BIAYA

PROYEK : PERUMAHAN BUMI SENENTANG ADHYAKSA RESIDENCE


PEKERJAAN : RUMAH TINGGAL TYPE 36
LOKASI : SINTANG

NO URAIAN PEKERJAAN

A PEKERJAAN PERSIAPAN

B PEKERJAAN PONDASI

C PEKERJAAN KONSTRUKSI BETON

D PEKERJAAN BETON LANTAI

E PEKERJAAN DINDING

F PEKERJAAN KAYU KOZEN

G PEKERJAAN ATAP & PLAFOND

H PEKERJAAN SANITASI

I PEKERJAAN INSTALASI LISTRIK

J PEKERJAAN LANTAI & PENGECATAN

K LAIN - LAIN

Sub Jumlah A - K
Total Pembulatan TIPE 36 1.00 UNIT
JUMLAH Type 36 KESELURUHAN 210.00 UNIT
Terbilang :
Tujuh Miliar Sembilan Ratus Dua Puluh Juta Sembilan Ratus Sembilan Puluh Ribu Rupiah

Sintang,30 April 2018


Dibuat,
( Obang Rahmad )
Estimator
TULASI ANGARAN BIAYA

JUMLAH HARGA
(Rp.)

530,218.94

2,536,583.04

7,129,864.46

2,567,423.99

5,600,657.34

2,538,000.00

7,604,555.21

2,026,484.15

2,260,500.00

4,496,576.77

428,437.53

37,719,301.43
37,719,000.00
7,920,990,000.00
SPESIFIKASI PEKERJAAN RUMAH TYPE 3

PROYEK : PERUMAHAN BUMI SENENTANG ADHYAKSA RESIDENCE


PEKERJAAN : RUMAH TINGGAL TYPE 36
LOKASI : SINTANG
OWNER : PT RAHADIAN MANDIRI PROPERTI
TAHUN : 2018

NO URAIAN PEKERJAAN SPESIFIKASI

A PEKERJAAN PERSIAPAN
1 Bouplank & Pengukuran Papan 2/20

B PEKERJAAN PONDASI
1 Pondasi Setempat Beton 1 : 2 :3
Tulang utama besi 10 mm
2 Cerucuk Kayu Dolken

C PEKERJAAN KONSTRUKSI BETON


1 Beton Sloof 15/40 Beton 1 : 2 :3
Tulang utama besi 10 mm
Tulangan Sengkang besi 6 mm

2 Beton Kolom Praktis Beton 1 : 2 :3


Tulang utama besi 10 mm
Tulangan Sengkang besi 6 mm

3 Beton Kolom Struktur 15/15 Beton 1 : 2 :3


Tulang utama besi 10 mm
Tulangan Sengkang besi 6 mm

4 Beton Kolom Teras 12/50 Beton 1 : 2 :3


Tulang utama besi 10 mm
Tulangan Sengkang besi 6 mm

5 Ring Balok 10/15 Beton 1 : 2 :3


Tulang utama besi 10 mm
Tulangan Sengkang besi 6 mm

D PEKERJAAN LANTAI & KERAMIK


1 Beton Plat Lantai 8 cm Beton Mutu K-0

E PEKERJAAN DINDING
1 Batako Tebal Batako min. 8 cm
2 Pasangan Dinding Batako Pasaangan 1/2 bata

F PEKERJAAN PLASTER + ACI


1 Plester Dinding Campran 1 Semen : 3 Pasir

2 Acian

G PEKERJAAN PEMASANGAN KUSEN


1 Kusen Pintu Jendela Kayu kelas II

H PEKERJAAN PINTU & JENDELA


1 Pintu Kayu kelas II

2 Jendela Kayu kelas II


Kaca polos, tebal 5 mm
I PEKERJAAN PEMASANGAN AKSESORIS PINTU & JENDELA
1 Engsel Pintu Ukuran 4''
2 Engsel Jendela Ukuran 3''
3 Kunci Tanam Kunci Tanam 2 Slot 10''
4 Slot Jendela Ukuran 3'', kuningan
5 Kait Angin Hak Angin Panjang 20cm
J PEKERJAAN ATAP
1 Rangka Atap Kayu Kelas II Kayu kelas II

2 Penutup Atap Spandek, warna coklat tua


Tebal 0.2 mm
3 Listplank Kayu Kls. II

4 Nok Atap/Perabung Coating, Warna sama dengan atap


Tebal 0.2 mm
K PEKERJAAN PLAFOND
1 Rangka Plafond Kayu 4/4 Kayu kelas II
2 Plafond Gypsum Gypsum
3 List Plafond Kayu Kelas II
L PEKERJAAN SANITASI
1 Bak Mandi Fibreglass Warna Merah Tua
2 Kloset Jongkok Warna Putih
3 Kran Air Kran Air Biasa
4 Instalasi Air Bersih Pipa PVC 1/2" AW
5 Instalasi Air Kotor Pipa PVC 3" & 4" type D
6 Floor drain Warna Biru Muda + Syphon
7 Septitank Gorong diameter 100 cm
M PEKERJAAN INSTALASI LISTRIK
1 Kabel Kabel NYA uk. 2.5 mm²
2 Stop Kontak, Saklar Type Inbow
3 MCB
4 Lampu Type SL
5 Fiting Lampu Downlight
N PEKERJAAN LANTAI KERAMIK
1 Keramik Lantai Ukuran 30 x 30 cm, warna putih
2 Keramik Lantai WC/KM Ukuran 20 x 20 cm
3 Keramik Teras Depan Ukuran 40 x 40 cm, warna abu-abu
O PEKERJAAN PENGECATAN
1 Cat Dinding Dalam Dasar Plamir, Finishing Cat Dinding
Warna Putih
2 Cat Dinding Luar Cat dasar weather shield anti jamur
Finishing Cat dinding
Warna Mengikuti Gambar
3 Cat Plafond Cat sesuai dengan cat dinding

4 Cat Kusen Finishing Cat warna Coklat Tua

5 Cat Daun Pintu & Jendela Finishing Cat warna Coklat Tua

6 Cat List Plafond & Lisplank Finishing Cat warna Putih

P LAIN - LAIN
1 Lantai Carport Rabat Beton L 2,10 m x P 2 m Beton Mutu K-0
2 Pekerjaan Pembersihan

NB : Apabila kontraktor akan mengunakan material pengganti selain yang tersebut dalam spesifikasi diatas, harap mengaj
tertulis dari Project Manager. Bila dikemudian hari ditemukan pengunaan material yang tidak sesuai, penerapan dime
pengurangan item pekerjaan dari spesifikasi, pihak owner berhak menolak hasil kerja kontraktor & meminta ganti se
ASI PEKERJAAN RUMAH TYPE 36

Luas Lantai (M2) : 36 m2 (Keramik 30x30)


Dinding : Batako 20cm x 40cm
Atap : Spandek 0.2

KETERANGAN

Papan bowplank diijinkan dibongkar setelah pemasangan kepala batako

Beton campuran 1 Semen : 2 Pasir : 3 Spit/Koral


Tulangan Utama 6 btg, cakar ayam mengunakan besi 10 mm
Bentangor,Jenger, 1 Pondasi berjumlah 5 btg, Diameter 8 cm Panjang disesuaikan dengan
kondisi/jenis tanah

Beton campuran 1 Semen : 2 Pasir : 3 Spit/Koral


Tulangan Utama 4 batang
Jarak tulangan sengkang/cincin 20 cm
Dimensi sesuai gambar 15 x 40
Beton campuran 1 Semen : 2 Pasir : 3 Spit/Koral
Tulangan Utama 4 batang
Jarak tulangan sengkang/cincin 15 cm
Apabila memakai stek besi, panjang stek min. 60 cm
Dimensi sesuai pasangan batako
Beton campuran 1 Semen : 2 Pasir : 3 Spit/Koral
Tulangan Utama 4 batang
Jarak tulangan sengkang/cincin 15 cm
Dimensi sesuai gambar 15 x 15
Beton campuran 1 Semen : 2 Pasir : 3 Spit/Koral
Tulangan Utama 6 batang
Jarak tulangan sengkang/cincin 15 cm
Dimensi sesuai gambar 12 x 50
Beton campuran 1 Semen : 2 Pasir : 3 Spit/Koral
Tulangan Utama 4 batang
Jarak tulangan sengkang/cincin 15 cm
Dimensi sesuai gambar 10 x 15

Beton Tebal 8 cm campuran 1 Semen : 2 Pasir : 5 Spit/Koral

Campuran batako 1 Semen : 4 Pasir


Campuran pasangan batako 1 Semen : 3 Pasir

Seluruh dinding diplester dari sloof s.d ring balok, tebal plasteran 2 cm ###
Untuk dinding kamar mandi Campran 1 Semen : 2 Pasir
Seluruh dinding diplester arus di Aci semen & di finising gosok halus
Tidak di ijinkan finishing kuas

Kayu meranti merah, mabang, kelansau


Ukuran sesuai gambar
Ketam halus 4 sisi di skoneng & di kloter

Kayu meranti merah, mabang, kelansau


Panel memakai papan 3 cm / plywood tebal 9mm
Ukuran sesuai gambar
Kayu meranti merah, mabang, kelansau
Ukuran sesuai gambar

Satu jendela dipasang 2 engsel


Satu pintu dipasang 3 engsel
Merk SES/DEKKSEON/YALE/ROYAL/SOLID

Satu Jendela dipasang 2 kait angin, type polos E.81

Kayu meranti merah, mabang, kelansau


Rangka atap kayu uk. 5/7 cm atau 6/6 cm
Merk Multi Roof, Sakura Roof
Paku mengunakan paku khusus multiroof, galvanis
Kayu meranti merah, mabang, kelansau, resak
Kayu ukuran 3/30 cm, ketam 4 sisi

Galang utama kayu 3/5 cm


Dipasang sesuai gambar
Lis Profil Siku ukuran 5 x 5 cm
Merk INA / setara
Merk Onda Type BL
Pipa PVC Merk Wavin, Vinilon, Unilon, Maspion, Pralon, Sinar Lucky
Pipa PVC Merk Wavin, Vinilon, Unilon, Maspion, Pralon, Sinar Lucky
Floor Drain Plastik
Setiap 1 Septitank 4 sambung gorong-gorong

Merk ETERNA / ETERNA


Merk BROCO pemasangan dilengkapi Inbow Doos
Merk MG/Scheneider/Broco
Merk PHILIPS, ukuran sesuai gambar
Fiting Merk BROCO

Polish, Merk ROMAN/PLATINUM/MULIA


Bertekstur dan tidak licin, Merk ROMAN/PLATINUM/MULIA
Merk ROMAN/PLATINUM/MULIA

Cat dinding Merk VINILEX 5000, Emulsion Paint


Cat minimal 2 lapis/sampai rata & tidak membayang.
Cat dasar weather shield warna putih 1 lapis
Cat dinding Merk VINILEX 5000, Emulsion Paint
Cat minimal 2 lapis/sampai rata & tidak membayang.
Cat dinding Merk VINILEX 5000, Emulsion Paint ###
Cat minimal 2 lapis/sampai rata & tidak membayang. ###
Cat kayu Merk PLATONE 8000, No. NP 084
Cat minimal 2 lapis/sampai rata & tidak membayang.
Cat kayu Merk PLATONE 8000, No. NP 084
Cat minimal 2 lapis/sampai rata & tidak membayang.
Cat kayu Merk PLATONE 8000
Cat minimal 2 lapis/sampai rata & tidak membayang.

Beton Tebal 8 cm campuran 1 Semen : 2 Pasir : 5 Spit/Koral


Setelah rumah 100% selesai rumah harus dibersih kan dari sisa-sia material
baik di dalam maupun di luar/halaman

dalam spesifikasi diatas, harap mengajukan sampel material ke Project Manager dan harus mendapat persetujuan
erial yang tidak sesuai, penerapan dimensi yang tidak sesuai,penggunaan campuran yang tidak sesuai dan
sil kerja kontraktor & meminta ganti sesuai dengan spesifikasi material yang terlampir diatas.

Sintang, 2018
Diterima dan disetujui,
.............................................................
Kontraktor
RENCANA ANGGARAN BIAYA

PROYEK : PERUMAHAN BUMI SENENTANG ADHYAKSA RESIDENCE Luas Lantai (M2)


PEKERJAAN : RUMAH TINGGAL TYPE 36 Lantai Teras (M2)
LOKASI : SINTANG Dinding
PEMILIK : PT RAHADIAN MANDIRI PROPERTI Atap
HARGA PER UNIT : Rp57,546,102
HARGA KONTRAK : Rp57,000,000

HARGA SATUAN
NO URAIAN PEKERJAAN VOL SAT (Rp.)

A PEKERJAAN PERSIAPAN
1 Bouplank & Pengukuran 38.00 m1 13,953.13

Sub Jumlah
B PEKERJAAN PONDASI
1 Galian Tanah Pondasi 3.28 m3 19,116.15
2 Cerucuk Dia. 8 Panjang = 4 m 52.00 Btg 10,000.00
3 Pasir Urug Tebal 15 Cm 1.64 m³ 88,699.90
4 Lantai Kerja Tebal 5 cm K100 0.23 m³ 746,067.99
5 Pondasi Setempat
- Beton Cam 1:2:3 K 225 1.02 m³ 702,195.04
- Pembesian 96.66 kg 8,942.98
- Bekisting 1.25 m² 32,692.84
6 Urugan Tanah Kembali 1.64 m³ 6,038.03
Sub Jumlah
C PEKERJAAN KONSTRUKSI BETON
1 Beton Sloof 15/40
- Beton Cam 1:2:3 K 225 1.93 m³ 702,195.04
- Pembesian 135.75 kg 8,942.98
- Bekisting 6.40 m² 12,420.53
2 Beton Kolom Praktis 10/15
- Beton Cam 1:2:3 K 225 0.47 m³ 702,195.04
- Pembesian 93.44 kg 8,942.98
- Bekisting 2.36 m² 20,781.82
3 Beton Kolom Struktur Praktis 15/15
- Beton Cam 1:2:3 K 225 0.40 m³ 702,195.04
- Pembesian 53.86 kg 8,942.98
- Bekisting 1.75 m² 20,781.82
4 Beton Kolom Struktur Praktis 12/50
- Beton Cam 1:2:3 K 225 0.46 m³ 702,195.04
- Pembesian 38.00 kg 8,942.98
- Bekisting 2.36 m² 20,781.82
5 Ring Balok 10/15
- Beton Cam 1:2:3 K 225 0.66 m³ 702,195.04
- Pembesian 129.70 kg 8,942.98
- Bekisting 3.21 m² 42,463.65
Sub Jumlah
D PEKERJAAN BETON LANTAI
1 Beton Plat Lantai 8 cm
- Urug Tanah Bawah Lantai 0,35 cm 10.33 m³ 6,038.03
- Urug Pasir 5 cm 2.07 m³ 88,699.90
- Beton Cam 1:2:3 K 225 3.31 m³ 702,195.04
Sub Jumlah
E PEKERJAAN DINDING
1 Pasang Dinding Batako 106.00 m2 52,836.39

Sub Jumlah
F PEKERJAAN PLASTER + ACI
1 Plester Dinding 246.38 m2 16,001.14
2 Acian 246.38 m² 10,366.50
Sub Jumlah
G PEKERJAAN PEMASANGAN KUSEN
1 Kusen Pintu Jendela
- PV1 7.50 M' 45,000.00
- PV2 7.20 M' 45,000.00
- P1 10.00 M' 45,000.00
- JV1 15.80 M' 45,000.00
- JV2 5.70 M' 45,000.00
- JV3 10.20 M' 45,000.00
Sub Jumlah
H PEKERJAAN PINTU & JENDELA
1 Pintu PVC 1.00 unit 250,000.00
2 Daun Pintu & Jendela Kayu Kelas II
- PV1 1.00 unit 500,000.00
- PV2 1.00 unit 500,000.00
- P1 2.00 unit 500,000.00
- JV1 4.00 unit 250,000.00
- JV2 1.00 unit 250,000.00
- JV3 2.00 unit 250,000.00
Sub Jumlah
I PEKERJAAN PEMASANGAN AKSESORIS PINTU & JENDELA
1 Engsel Pintu 16.00 buah 21,145.95
2 Engsel Jendela 21.00 buah 19,145.95
3 Kunci Tanam 4.00 buah 192,374.13
4 Slot Jendela 7.00 buah 22,861.27
5 Kait Angin 14.00 buah 14,296.00
Sub Jumlah
J PEKERJAAN ATAP
1 Rangka Atap Kayu Kelas II 75.00 m² 34,542.89
2 Listplank Kayu Kls. II 49.00 m1 11,599.29
3 Penutup Atap Spandek 75.00 m² 59,272.98
Sub Jumlah
K PEKERJAAN PLAFOND
1 Rangka Plafond Kayu 4/4 37.00 m² 41,387.06
2 Plafond Gypsum 37.00 m² 38,092.33

Sub Jumlah
L PEKERJAAN SANITASI
1 Bak Mandi Fibreglass 1.00 bh 250,000.00
2 Kloset Jongkok 1.00 bh 331,720.50
3 Kran Air 1.00 bh 27,758.13
4 Instalasi Air Kotor & Air Bersih
- Saluran Air Bersih PVC 3/4 " 1.50 m¹ 16,752.89
- Saluran Air Kotor PVC 2'' 1.00 m¹ 105,601.24
- Saluran Septitank PVC 4'' 0.83 m¹ 103,529.94
5 Septitank
- Septictank 1.00 ls 1,200,000.00
Sub Jumlah
M PEKERJAAN INSTALASI LISTRIK
1 Pemasangan Instalasi Listrik 7.00 Titik 50,000.00
2 Pemasangan Lampu SL 18 Watt 7.00 Bh 112,500.00
3 Pemasangan Stop Kontak 8.00 Bh 126,000.00
4 Pemasangan Sakelar Tunggal 5.00 Bh 20,000.00
5 Pemasangan Sakelar Ganda 1.00 Bh 15,000.00
Sub Jumlah
N PEKERJAAN LANTAI KERAMIK
1 Lantai Keramik 30/30 33.00 m² 105,300.25
2 Lantai Teras & WC Keramik 20/20 9.00 m² 113,518.73
Sub Jumlah
O PEKERJAAN PENGECATAN
1 Cat Dinding & Kanopi 255.38 m² 13,126.62
2 Cat Plafond 39.83 m² 13,126.62
3 Cat Pintu & Jendela 25.66 m² 18,145.69
4 Cat Listplang 9.85 m 1
18,145.69
Sub Jumlah
P LAIN - LAIN
1 Lantai Carport Rabat Beton L 2,10 m x P 2 m 0.34 m2 702,195.04
2 Pekerjaan Pembersihan 77.00 m 2
2,500.00
Sub Jumlah
Sub Total A - K
ANA ANGGARAN BIAYA

: 36 m2 (Keramik 30x30)
: 5,97 m2 (Keramik 20x20)
: Batako 20cm x 40cm
: Spandek 0.2

TOTAL (Rp.)

530,218.94

530,218.94
###
62,700.97
520,000.00
145,290.44
174,579.91
###
718,872.18
864,448.58
40,800.66
9,890.30
2,536,583.04
###
###
1,355,236.43
1,213,966.62
79,491.38
###
331,787.16
835,631.91
49,097.06
###
280,878.02
481,668.82
36,368.19
###
320,200.94
339,833.18
48,941.20
###
460,710.17
1,159,904.31
136,149.07
7,129,864.46
###
###
62,387.96
183,298.34
2,321,737.69
2,567,423.99
###
5,600,657.34

5,600,657.34
###
3,942,359.89
2,554,098.27
6,496,458.16
###
###
337,500.00
324,000.00
450,000.00
711,000.00
256,500.00
459,000.00
2,538,000.00
###
250,000.00
###
500,000.00
500,000.00
1,000,000.00
1,000,000.00
250,000.00
500,000.00
4,000,000.00
###
338,335.18
402,064.92
769,496.50
160,028.86
200,143.98
1,870,069.44
###
2,590,716.50
568,365.21
4,445,473.50
7,604,555.21
###
1,531,321.31
1,409,416.34

2,940,737.65
###
250,000.00
331,720.50
27,758.13
###
25,129.33
105,601.24
86,274.95

1,200,000.00
2,026,484.15
###
350,000.00
787,500.00
1,008,000.00
100,000.00
15,000.00
2,260,500.00
###
3,474,908.17
1,021,668.60
4,496,576.77
###
3,352,276.22
522,833.27
465,618.34
178,807.60
4,519,535.43
###
235,937.53
192,500.00
428,437.53
57,546,102.11
BOBOT RENCANA DAN REALISAI PELAKSANAAN PEKERJAAN
TIME SCHEDULE

KEGIATAN : PEMBANGUNAN PERUMAHAN BUMI SENENTANG ADYAKSA RESIDENCE START PROJECT : Monday, May 14, 2018
PEKERJAAN : TIPE 36 RUMAH CONTOH 3 UNIT FINISH PROJECT : Sunday, June 10, 2018
LOKASI : JALAN KELAM JERORA SATU - SINTANG JUMLAH MINGGU : 4 MINGGU
TAHUN : 2018

MEI 2018 Friday, June 01, 2018


MINGGU KE-1 MINGGU KE-2 MINGGU KE-3 MINGGU KE-4
Prestasi
No URAIAN PEKERJAAN Jumlah Harga BOBT 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 Keterangan
( Rp ) ( % )

A PEKERJAAN PERSIAPAN 530,218.94 0.93 0.31 0.31 0.31 100.0%


B PEKERJAAN PONDASI 2,536,583.04 4.47 1.49 1.49 1.49 Bobot Rencana
C PEKERJAAN KONSTRUKSI BETON 7,129,864.46 12.57 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
D PEKERJAAN BETON LANTAI 2,567,423.99 4.52 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 Kurva S
E PEKERJAAN DINDING 5,600,657.34 9.87 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10
F PEKERJAAN PLASTER + ACI 6,496,458.16 11.45 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64
G PEKERJAAN PEMASANGAN KUSEN 2,538,000.00 4.47 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
H PEKERJAAN PINTU & JENDELA 4,000,000.00 7.05 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64
I PEKERJAAN PEMASANGAN AKSESORIS PINTU & JENDELA 1,870,069.44 3.30 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 50.0%
J PEKERJAAN ATAP 7,604,555.21 12.40 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38
K PEKERJAAN PLAFOND 2,940,737.65 5.18 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43
L PEKERJAAN SANITASI 2,026,484.15 3.57 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24
M PEKERJAAN INSTALASI LISTRIK 2,260,500.00 3.98 0.66 0.66 0.66 0.66 0.66 0.66
N PEKERJAAN LANTAI KERAMIK 4,496,576.77 7.92 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57 0.57
O PEKERJAAN PENGECATAN 4,519,535.43 7.97 2.66 2.66 2.66
P LAIN - LAIN 428,437.53 0.34
100.00 0.34 0.00%
RENCANA MINGGUAN 0.31 1.80 2.85 2.78 2.38 2.83 2.83 4.21 4.84 4.84 4.84 5.22 6.29 5.47 4.99 4.54 3.16 3.16 2.93 2.93 2.93 3.59 3.59 2.57 2.14 4.52 3.89 3.56
RENCANA KOMULATIF MINGGUAN 0.00 0.31 2.11 4.96 7.74 10.12 12.95 15.78 19.98 24.83 29.67 34.51 39.73 46.03 51.50 56.49 61.03 64.19 67.36 70.29 73.21 76.14 79.73 83.32 85.89 88.03 92.55 96.44 ###
PT RAHADIAN MANDIRI PROPERTI REKAPITULASI
LAPORAN KEMAJU
HARI
TANGGAL
KEGIATAN : PEMBANGUNAN PERUMAHAN BUMI SENENTANG ADYAKSA RESIDENCE OWNER
DIREKTUR
PEKERJAAN : TIPE 36 RUMAH CONTOH 3 UNIT PROJECT MANAGER
LOKASI : JALAN KELAM JERORA SATU - SINTANG KONTRAKTOR PELAKSANA
TAHUN : 2018 PELAKSANA LAPANGAN

BOBOT
NO U R A I A N P E K E R J A A N PEKERJAAN

A PEKERJAAN PERSIAPAN 0.93

B PEKERJAAN PONDASI 4.47

C PEKERJAAN KONSTRUKSI BETON 12.57

D PEKERJAAN BETON LANTAI 4.52

E PEKERJAAN DINDING 9.87

F PEKERJAAN PLASTER + ACI 11.45

G PEKERJAAN PEMASANGAN KUSEN 4.47

H PEKERJAAN PINTU & JENDELA 7.05

I PEKERJAAN PEMASANGAN AKSESORIS PINTU & JENDELA 3.30

J PEKERJAAN ATAP 12.40

K PEKERJAAN PLAFOND 5.18

L PEKERJAAN SANITASI 3.57

M PEKERJAAN INSTALASI LISTRIK 3.98

N PEKERJAAN LANTAI KERAMIK 7.92

O PEKERJAAN PENGECATAN 7.97

P LAIN - LAIN 0.34

JUMLAH BOBOT :

Perkiraan Kemajuan Pekerjaan Terhadap Keseluruhan


Terbilang : (Empat Puluh Empat Koma Enam Puluh Empat Persen)

KETERANGAN : Rencana Komulatif per Minggu : 79.73


: Selisih Terhadap Realisasi di Lapangan :
: Realisasi Pekerjaan di Lapangan Mengalami Kemajuan / Kemunduran Sebesar

Mengetahui Oleh,
PT. RAHADIAN MANDIRI PROPERTI

BOY RAHADIAN
Direktur
PT RAHADIAN MANDIRI PROPERTI L A P O R A N
LAPORAN KEMAJ
HARI
TANGGAL
KEGIATAN : PEMBANGUNAN PERUMAHAN BUMI SENENTANG ADYAKSA RESIDENCE OWNER
DIREKTUR
PEKERJAAN : TIPE 36 RUMAH CONTOH 3 UNIT PROJECT MANAGER
LOKASI : JALAN KELAM JERORA SATU - SINTANG KONTRAKTOR PELAKSANA
TAHUN : 2018 PELAKSANA LAPANGAN

NO U R A I A N P E K E R J A A N V O L U M E SATUAN
PER UNIT

A PEKERJAAN PERSIAPAN
1 Bouplank & Pengukuran 38.00 m1

B PEKERJAAN PONDASI
1 Galian Tanah Pondasi 3.28 m3
2 Cerucuk Dia. 8 Panjang = 4 m 52.00 Btg
3 Pasir Urug Tebal 15 Cm 1.64 m³
4 Lantai Kerja Tebal 5 cm K100 0.23 m³
5 Pondasi Setempat -
Beton Cam 1:2:3 K 225 1.02 m³
Pembesian 96.66 kg
Bekisting 1.25 m²
6 Urugan Tanah Kembali 1.64 m³

C PEKERJAAN KONSTRUKSI BETON


1 Beton Sloof 15/40
Beton Cam 1:2:3 K 225 1.93 m³
Pembesian 135.75 kg
Bekisting 6.40 m²
2 Beton Kolom Praktis 10/15 -
Beton Cam 1:2:3 K 225 0.47 m³
Pembesian 93.44 kg
Bekisting 2.36 m²
3 Beton Kolom Struktur Praktis 15/15 -
Beton Cam 1:2:3 K 225 0.40 m³
Pembesian 53.86 kg
Bekisting 1.75 m²
4 Beton Kolom Struktur Praktis 12/50 -
Beton Cam 1:2:3 K 225 0.46 m³
Pembesian 38.00 kg
Bekisting 2.36 m²
5 Ring Balok 10/15 -
Beton Cam 1:2:3 K 225 0.66 m³
Pembesian 129.70 kg
Bekisting 3.21 m²

D PEKERJAAN BETON LANTAI


1 Beton Plat Lantai 8 cm
Urug Tanah Bawah Lantai 0,35 cm 10.33 m³
Urug Pasir 5 cm 2.07 m³
Beton Cam 1:2:3 K 225 3.31 m³

E PEKERJAAN DINDING
1 Pasang Dinding Batako 106.00 m2

F PEKERJAAN PLASTER + ACI


1 Plester Dinding 246.38 m2
2 Acian 246.38 m²

G PEKERJAAN PEMASANGAN KUSEN


1 Kusen Pintu Jendela
PV1 7.50 M'
PV2 7.20 M'
P1 10.00 M'
JV1 15.80 M'
JV2 5.70 M'
JV3 10.20 M'
H PEKERJAAN PINTU & JENDELA
1 Pintu PVC 1.00 unit
2 Daun Pintu & Jendela Kayu Kelas II - 0.00
PV1 1.00 unit
PV2 1.00 unit
P1 2.00 unit
JV1 4.00 unit
JV2 1.00 unit
JV3 2.00 unit

I PEKERJAAN PEMASANGAN AKSESORIS PINTU & JENDELA


1 Engsel Pintu 16.00 buah
2 Engsel Jendela 21.00 buah
3 Kunci Tanam 4.00 buah
4 Slot Jendela 7.00 buah
5 Kait Angin 14.00 buah

J PEKERJAAN ATAP
1 Rangka Atap Kayu Kelas II 75.00 m²
2 Penutup Atap Spandek 75.00 m²

K PEKERJAAN PLAFOND
1 Rangka Plafond Kayu 4/4 37.00 m²
2 Plafond Gypsum 37.00 m²
3 ### - 0.00

L PEKERJAAN SANITASI
1 Bak Mandi Fibreglass 1.00 bh
2 Kloset Jongkok 1.00 bh
3 Kran Air 1.00 bh
4 Instalasi Air Kotor & Air Bersih -
Saluran Air Bersih PVC 3/4 " 1.50 m¹
Saluran Air Kotor PVC 2'' 1.00 m¹
5 Saluran Septitank PVC 4'' 0.83 m¹
6 Septitank -
Septictank 1.00 ls

M PEKERJAAN INSTALASI LISTRIK


1 Pemasangan Instalasi Listrik 7.00 Titik
2 Pemasangan Lampu SL 18 Watt 7.00 Bh
3 Pemasangan Stop Kontak 8.00 Bh
4 Pemasangan Sakelar Tunggal 5.00 Bh
5 Pemasangan Sakelar Ganda 1.00 Bh

N PEKERJAAN LANTAI KERAMIK


1 Lantai Keramik 30/30 33.00 m²
2 Lantai Teras & WC Keramik 20/20 9.00 m²

O PEKERJAAN PENGECATAN
1 Cat Dinding & Kanopi 255.38 m²
2 Cat Plafond 39.83 m²
3 Cat Pintu & Jendela 25.66 m²
4 Cat Listplang 9.85 m1

P LAIN - LAIN
1 Pekerjaan Pembersihan 77.00 m2
REKAPITULASI MINGGU KE : 3
LAPORAN KEMAJUAN PEKERJAAN
: SENIN - MINGGU
: 28 MEI 2018 - 03 JUNI 2018
: PT. RAHADIAN MANDIRI PROPERTI
: BOY RAHADIAN
: OBANG RAHMAD
KONTRAKTOR PELAKSANA : YANTO
PELAKSANA LAPANGAN : AHIYUNG

BOBOT
PROGRESS BOBOT RENCANA
PEKERJAAN YANG TELAH SESUAI JDWAL
TERCAPAI RENCANA
% % %

0.93

4.47

12.57

4.15

9.87

8.90

4.47

6.41

2.47

12.40

4.32

3.57

#VALUE! #VALUE! 0.66

#VALUE! #VALUE! 4.53

#VALUE! #VALUE! 0.00

#VALUE! #VALUE! 0.00

79.73
Sintang, 03 Mei 2018
Dibuat Oleh,

Obang Rahmad
Project Manager
L A P O R A N MINGGU KE : 3

LAPORAN KEMAJUAN PEKERJAAN


: SENIN - MINGGU
: 28 MEI 2018 - 03 JUNI 2018
: PT. RAHADIAN MANDIRI PROPERTI
: BOY RAHADIAN
: OBANG RAHMAD
KONTRAKTOR PELAKSANA : YANTO
PELAKSANA LAPANGAN : AHIYUNG

BOBOT PROGRESS BOBOT


PEKERJAAN PEKERJAAN PEKERJAAN
PER ITEM-ITEM PER ITEM-ITEM YG TELAH
PEKERJAAN PEKERJAAN TERCAPAI
% % %

0.93

0.11
0.92 #VALUE! #VALUE!
0.26 #VALUE! #VALUE!
0.31 #VALUE! #VALUE!

1.27 #VALUE! #VALUE!


1.52 #VALUE! #VALUE!
0.07 #VALUE! #VALUE!
0.02 #VALUE! #VALUE!

2.39 #VALUE! #VALUE!


2.14 #VALUE! #VALUE!
0.14 #VALUE! #VALUE!

0.58 #VALUE! #VALUE!


1.47 #VALUE! #VALUE!
0.09 #VALUE! #VALUE!

0.50 #VALUE! #VALUE!


0.85 #VALUE! #VALUE!
0.06 #VALUE! #VALUE!

0.56 #VALUE! #VALUE!


0.60 #VALUE! #VALUE!
0.09 #VALUE! #VALUE!
0.00 0.00 0.00
0.81 #VALUE! #VALUE!
2.04 #VALUE! #VALUE!
0.24 #VALUE! #VALUE!

0.11
0.32
4.09

9.87

6.95
4.50

0.59 #VALUE! #VALUE!


0.57 #VALUE! #VALUE!
0.79 #VALUE! #VALUE!
1.25 #VALUE! #VALUE!
0.45 #VALUE! #VALUE!
0.81 #VALUE! #VALUE!
0.44 #VALUE! #VALUE!

0.88 #VALUE! #VALUE!


0.88 #VALUE! #VALUE!
1.76 #VALUE! #VALUE!
1.76 #VALUE! #VALUE!
0.44 #VALUE! #VALUE!
0.88 #VALUE! #VALUE!

0.60
0.71
1.36
0.28 #VALUE! #VALUE!
0.35 #VALUE! #VALUE!

4.57
7.83

2.70 #VALUE! #VALUE!


2.48 #VALUE! #VALUE!
0.00 #VALUE! #VALUE!

0.44
0.58
0.05 #VALUE! #VALUE!

0.04 #VALUE! #VALUE!


0.19 #VALUE! #VALUE!
0.15 #VALUE! #VALUE!

2.11 #VALUE! #VALUE!

0.62 #VALUE! #VALUE!


1.39
1.78 #VALUE! #VALUE!
0.18 #VALUE! #VALUE!
0.03 #VALUE! #VALUE!
#VALUE!
6.12 #VALUE! #VALUE!
1.80
#VALUE!

5.91 #VALUE! #VALUE!


0.92
0.82 #VALUE! #VALUE!
0.32 #VALUE! #VALUE!
#VALUE!

0.34 #VALUE! #VALUE!


#VALUE!
LAPORAN MINGGUAN
PT RAHADIAN MANDIRI PROPERTI

NAMA PROYEK : RUMAH CONTOH TIPE 36 (3 UNIT)


NOMOR KONTRAK : 001/BSA/STG/05/2018-T36
LOKASI : SINTANG - KALIMANTAN BARAT START PROJECT
KONTRAKTOR : YANTO FINISH PROJECT
PERIODE LAPORAN : 11 MEI 2018 S/D 17 MEI 2018 JUMLAH MINGGU
MINGGU KE - : 1 (SATU)

PEKERJAAN YANG BERLANGSUNG FOTO PROGRESS PROJECT

NO HARI TANGGAL KEGIATAN


1 SENIN 11 Mei 2018 Pembuatan Bedeng Pekerja
2 SELASA 12 Mei 2018 Pasang Bowplank & Galian Pondasi
3 RABU 13 Mei 2018 Pabrikasi Besi Pondasi & Sloof
4 KAMIS 14 Mei 2018 Pabrikasi Besi Pondasi & Sloof
5 JUMAT 15 Mei 2018 Pabrikasi Bekisting Sloof
6 SABTU 16 Mei 2018 Pabrikasi Bekisting Sloof
7 MINGGU 17 Mei 2018 Pasang Bekisting Pondasi & Sloof

KONDISI CUACA DI LOKASI


NO HARI TANGGAL KETERANGAN Keterangan : Material Kayu
1 SENIN 11 Mei 2018 Cerah Hujan Jam
2 SELASA 12 Mei 2018 Cerah Hujan Jam
3 RABU 13 Mei 2018 Cerah Hujan Jam
4 KAMIS 14 Mei 2018 Cerah Hujan Jam
5 JUMAT 15 Mei 2018 Cerah Hujan Jam
6 SABTU 16 Mei 2018 Cerah Hujan Jam
7 MINGGU 17 Mei 2018 Cerah Hujan Jam

KENDALA & PERMASALAHAN : Keterangan : Pembuatan B

Kendaraan angkutan material tidak dapat masuk di karenakan jalan akses rusak

SOLUSI :
Perbaikan Akses masuk dengan perbaikan jalan
Keterangan : Pemasangan B

DIBUAT OLEH : DI KETAHUI OLEH :


PT RAHADIAN MANDIRI PROPERTI PT RAHADIAN MANDIRI PROPERTI

NAMA : OBANG RAHMAD NAMA : BOY RAHADIAN


JABATAN : Poject Manager JABATAN : Direktur Keterangan : Pekerjaan Pab
RAN MINGGUAN
DIAN MANDIRI PROPERTI

: ###
: ###
: 4 MINGGU

FOTO PROGRESS PROJECT

Keterangan : Material Kayu & Papan Mall

Keterangan : Pembuatan Bedeng Tukang


Keterangan : Pemasangan Bowplank

Keterangan : Pekerjaan Pabrikasi Pembesian Pondasi & Sloof


LAPORAN MINGGUAN
PT RAHADIAN MANDIRI PROPERTI

NAMA PROYEK : RUMAH CONTOH TIPE 36 (3 UNIT)


NOMOR KONTRAK : 001/BSA/STG/05/2018-T36
LOKASI : SINTANG - KALIMANTAN BARAT START PROJECT : ###
KONTRAKTOR : YANTO FINISH PROJECT : ###
PERIODE LAPORAN : 18 MEI 2018 S/D 24 MEI 2018 JUMLAH MINGGU : 4 MINGGU
MINGGU KE - : 2 (DUA)

PEKERJAAN YANG BERLANGSUNG FOTO PROGRESS PROJECT

NO HARI TANGGAL KEGIATAN


1 SENIN 18 Mei 2018 Pemasangan Bekisting Sloof
2 SELASA 19 Mei 2018 Pasang Bata dan Kusen
3 RABU 20 Mei 2018 Cor Kolom
4 KAMIS 21 Mei 2018 Pasang Bata dan Kusen
5 JUMAT 22 Mei 2018 Pasang Bekisting Kolom
6 SABTU 23 Mei 2018 Pasang Bata dan Kusen
7 MINGGU 24 Mei 2018 Istirahat

KONDISI CUACA DI LOKASI


NO HARI TANGGAL KETERANGAN Keterangan : Pekerjaan Pemasangan Bekisting Sloof
1 SENIN 18 Mei 2018 Cerah Hujan Jam
2 SELASA 19 Mei 2018 Cerah Hujan Jam
3 RABU 20 Mei 2018 Cerah Hujan Jam
4 KAMIS 21 Mei 2018 Cerah Hujan Jam
5 JUMAT 22 Mei 2018 Cerah Hujan Jam
6 SABTU 23 Mei 2018 Cerah Hujan Jam
7 MINGGU 24 Mei 2018 Cerah Hujan Jam

KENDALA & PERMASALAHAN : Keterangan : Pekerjaan Pemasangan Bekisting

SOLUSI :

Keterangan : Pemasangan Dinding Batako & Kusen

DIBUAT OLEH : DI KETAHUI OLEH :


PT RAHADIAN MANDIRI PROPERTI PT RAHADIAN MANDIRI PROPERTI

NAMA : OBANG RAHMAD NAMA : BOY RAHADIAN


JABATAN : Poject Manager JABATAN : Direktur Keterangan : Pemasangan Dinding Batako & Kusen
LAPORAN MINGGUAN
PT RAHADIAN MANDIRI PROPERTI

NAMA PROYEK : RUMAH CONTOH TIPE 36 (3 UNIT)


NOMOR KONTRAK : 001/BSA/STG/05/2018-T36
LOKASI : SINTANG - KALIMANTAN BARAT START PROJECT : ###
KONTRAKTOR : YANTO FINISH PROJECT : ###
PERIODE LAPORAN : 25 MEI 2018 S/D 28 MEI 2018 JUMLAH MINGGU : 4 MINGGU
MINGGU KE - : 3 (TIGA)

PEKERJAAN YANG BERLANGSUNG FOTO PROGRESS PROJECT

NO HARI TANGGAL KEGIATAN


1 SENIN 28 Mei 2018 Pemasangan Dinding Batako
2 SELASA 29 Mei 2018 Pekerjaan Kolom Teras
3 RABU 30 Mei 2018 Pengecoran Kolom Teras
4 KAMIS 31 Mei 2018 Pemasangan Rangka Atap
5 JUMAT 01 Juni 2018 Pemasangan Rangka Atap
6 SABTU 02 Juni 2018 Pemasangan Penutup Atap
7 MINGGU 03 Juni 2018 Pemasangan Penutup Atap

KONDISI CUACA DI LOKASI


NO HARI TANGGAL KETERANGAN Keterangan : Pemasanga Bekisting Kolom Teras
1 SENIN 28 Mei 2018 √ Cerah Hujan Jam
2 SELASA 29 Mei 2018 Cerah √ Hujan 06:00-10:00 Jam
3 RABU 30 Mei 2018 Cerah √ Hujan 05:00-08:00 Jam
4 KAMIS 31 Mei 2018 √ Cerah Hujan Jam
5 JUMAT 01 Juni 2018 Cerah √ Hujan 04:00-09:00 Jam
6 SABTU 02 Juni 2018 √ Cerah Hujan Jam
7 MINGGU 03 Juni 2018 √ Cerah Hujan Jam

PERSENTASE PROGRESS : Keterangan : Pasang Rangka Atap


MINGGU LALU MINGGU INI S/D SEKARANG

33.472 -

KENDALA & PERMASALAHAN :


Hari Jumat Tanggal 1 Juni 2018 Tukang Pulang 8 Orang, alasan pulang libur
Idul Fitri

SOLUSI : Keterangan : Pasang Penutup Atap

DIBUAT OLEH : DI KETAHUI OLEH :


PT RAHADIAN MANDIRI PROPERTI PT RAHADIAN MANDIRI PROPERTI

NAMA : OBANG RAHMAD NAMA : BOY RAHADIAN


JABATAN : Poject Manager JABATAN : Direktur Keterangan : Galian Sumur BOR
REKAP PROGRES
LAPORAN KEMAJUAN PEKERJAAN RUMAH CONTOH
KEGIATAN : PERUMAHAN BSA RESIDENCE
PEKERJAAN : PEMBANGUNAN RUMAH CONTOH T36
LOKASI : JERORA 1 SINTANG
KONTRAKTOR : YANTO
TGL. PEMERIKSAAN : Monday, September 03, 2018
TOT.NILAI KONTRAK : Rp171,000,000

NO NO KONTRAK NILAI KONTRAK (Rp) BLOK BOBOT (%)

I RUMAH CONTOH Rp 171,000,000


1 Rp 57,000,000 A1 100.00%
2 Rp 57,000,000 A2 100.00%
3 Rp 57,000,000 A3 100.00%
Total Harga
Retensi 5%
GRAND TOTAL
JUMLAH

Rp 57,000,000
Rp 57,000,000
Rp 57,000,000
Rp 171,000,000
Rp 8,550,000
Rp 162,450,000
REKAP PROGRES RUMAH YANG SUDAH AKAD
KEGIATAN : PERUMAHAN BSA RESIDENCE
PEKERJAAN : PEMBANGUNAN RUMAH T36
LOKASI : JERORA 1 SINTANG
TGL. PEMERIKSAAN : Monday, December 03, 2018

BOBOT SESUAI
NO KONTRAKTOR NILAI KONTRAK (Rp) BLOK OPNAME(%)

1 YANTO Rp 57,000,000 A1 100.00%


2 YANTO Rp 57,000,000 A2 100.00%
3 YANTO Rp 57,000,000 A3 100.00%
4 YANTO Rp 57,000,000 A4 97.22%
5 YANTO Rp 57,000,000 B1 97.22%
6 YANTO Rp 57,000,000 B2 97.22%
7 YANTO Rp 57,000,000 B3 97.22%
8 YANTO Rp 57,000,000 B4 97.22%
9 YANTO Rp 57,000,000 B5 97.22%
10 YANTO Rp 57,000,000 B6 97.22%
11 YANTO Rp 57,000,000 B7 97.22%
12 YANTO Rp 57,000,000 B8 97.22%
13 YANTO Rp 57,000,000 B9 97.22%
14 YANTO Rp 57,000,000 B10 97.22%
15 YANTO Rp 57,000,000 B12 97.22%
16 YANTO Rp 57,000,000 C3 97.22%
17 ANDY WIJAYA Rp 57,000,000 D26 66.67%
18 ANDY WIJAYA Rp 57,000,000 D27 66.67%
19 PASKALIS NIKO Rp 57,000,000 E6 85.56%
20 PASKALIS NIKO Rp 57,000,000 E7 86.94%
21 PASKALIS NIKO Rp 57,000,000 E9 99.44%
22 PASKALIS NIKO Rp 57,000,000 E10 100.00%
23 SUBHAN Rp 57,000,000 E12 58.33%
24 SUBHAN Rp 57,000,000 E30 58.33%
25 USMAN ALATAS Rp 57,000,000 F12 94.44%
26 USMAN ALATAS Rp 57,000,000 F14 94.44%
27 USMAN ALATAS Rp 57,000,000 F15 69.44%
28 USMAN ALATAS Rp 57,000,000 F16 51.39%
GRAND TOTAL MINGGU INI
ACC_BPD JUMLAH

100.00% Rp 57,000,000
100.00% Rp 57,000,000
100.00% Rp 57,000,000
100.00% Rp 55,416,667
100.00% Rp 55,416,667
100.00% Rp 55,416,667
100.00% Rp 55,416,667
100.00% Rp 55,416,667
100.00% Rp 55,416,667
100.00% Rp 55,416,667
100.00% Rp 55,416,667
100.00% Rp 55,416,667
100.00% Rp 55,416,667
100.00% Rp 55,416,667
100.00% Rp 55,416,667
100.00% Rp 55,416,667
Rp 38,000,000
Rp 38,000,000
Rp 48,766,667
Rp 49,558,333
100.00% Rp 56,683,333
100.00% Rp 57,000,000
Rp 33,250,000
Rp 33,250,000
100.00% Rp 53,833,333
100.00% Rp 53,833,333
Rp 39,583,333
Rp 29,291,667
Rp 1,422,466,667
REKAP PROGRES
LAPORAN KEMAJUAN PEKERJAAN
KEGIATAN : PERUMAHAN BSA RESIDENCE
PEKERJAAN : PEMBANGUNAN RUMAH T36
LOKASI : JERORA 1 SINTANG
KONTRAKTOR : SUBHAN
TGL. PEMERIKSAAN : Monday, December 03, 2018
TOT.NILAI KONTRAK : Rp1,140,000,000

NO NO KONTRAK NILAI KONTRAK (Rp) BLOK BOBOT (%)

I ...-BGN-T36/BSA/RMP/.../2018 Rp 570,000,000
1 Rp 57,000,000 E11 38.19%
2 Rp 57,000,000 E12 58.33%
3 Rp 57,000,000 E13 60.56%
4 Rp 57,000,000 E14 16.67%
5 Rp 57,000,000 E15 60.42%
6 Rp 57,000,000 E16 60.56%
7 Rp 57,000,000 E22 0.00%
8 Rp 57,000,000 E23 0.00%
9 Rp 57,000,000 E24 16.67%
10 Rp 57,000,000 E25 16.67%
Sub Total I

II ...-BGN-T36/BSA/RMP/.../2018 Rp 570,000,000
1 Rp 57,000,000 E26 16.67%
2 Rp 57,000,000 E27 16.67%
3 Rp 57,000,000 E28 52.78%
4 Rp 57,000,000 E29 12.50%
5 Rp 57,000,000 E30 58.33%
6 Rp 57,000,000 E31 58.33%
7 Rp 57,000,000 E32 19.44%
8 Rp 57,000,000 E33 19.44%
9 Rp 57,000,000 E34 19.44%
10 Rp 57,000,000 E35 0.00%
Sub Total II
GRAND TOTAL MINGGU INI
JUMLAH

Rp 21,770,833
Rp 33,250,000
Rp 34,516,667
Rp 9,500,000
Rp 34,437,500
Rp 34,516,667
Rp -
Rp -
Rp 9,500,000
Rp 9,500,000
Rp 186,991,667

Rp 9,500,000
Rp 9,500,000
Rp 30,083,333
Rp 7,125,000
Rp 33,250,000
Rp 33,250,000
Rp 11,083,333
Rp 11,083,333
Rp 11,083,333
Rp -
Rp 155,958,333
Rp 342,950,000
P R O G R E S
LAPORAN KEMAJUAN PEKERJAA
KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
PT. RAHADIAN MANDIRI PROPERTI LOKASI :
KONTRAKTOR :
TGL. PEMERIKSAAN :

NO U R A I A N P E K E R J A A N VOL SAT BOBOT


%

A PEKERJAAN PERSIAPAN 0.93


1 Bouplank & Pengukuran 38.00 m1 0.93

B PEKERJAAN PONDASI 4.43


1 Galian Tanah Pondasi 3.28 m3 0.11
2 Cerucuk Dia. 8 Panjang = 4 m 52.00 Btg 0.91
3 Pasir Urug Tebal 15 Cm 1.64 m³ 0.25
4 Lantai Kerja Tebal 5 cm K100 0.23 m³ 0.30
5 Pondasi Setempat -
Beton Cam 1:2:3 K 225 1.02 m³ 1.25
Pembesian 96.66 kg 1.51
Bekisting 1.25 m² 0.07
6 Urugan Tanah Kembali 1.64 m³ 0.02

C PEKERJAAN KONSTRUKSI BETON 12.44


1 Beton Sloof 15/40
Beton Cam 1:2:3 K 225 1.93 m³ 2.36
Pembesian 135.75 kg 2.12
Bekisting 6.40 m² 0.14
2 Beton Kolom Praktis 10/15 -
Beton Cam 1:2:3 K 225 0.47 m³ 0.58
Pembesian 93.44 kg 1.46
Bekisting 2.36 m² 0.09
3 Beton Kolom Struktur Praktis 15/15 -
Beton Cam 1:2:3 K 225 0.40 m³ 0.49
Pembesian 53.86 kg 0.84
Bekisting 1.75 m² 0.06
4 Beton Kolom Struktur Praktis 12/50 -
Beton Cam 1:2:3 K 225 0.46 m³ 0.56
Pembesian 38.00 kg 0.59
Bekisting 2.36 m² 0.09
5 Ring Balok 10/15
Beton Cam 1:2:3 K 225 0.66 m³ 0.80
Pembesian 129.70 kg 2.02
Bekisting 3.21 m² 0.24

D PEKERJAAN BETON LANTAI 4.48


1 Beton Plat Lantai 8 cm
Urug Tanah Bawah Lantai 0,35 cm 10.33 m³ 0.11
Urug Pasir 5 cm 2.07 m³ 0.32
Beton Cam 1:2:3 K 225 3.31 m³ 4.05

E PEKERJAAN DINDING 9.77


1 Pasang Dinding Batako 106.00 m2 9.77

F PEKERJAAN PLASTER + ACI 11.34


1 Plester Dinding 246.38 m2 6.88
2 Acian 246.38 m² 4.46

G PEKERJAAN PEMASANGAN KUSEN 4.43


1 Kusen Pintu Jendela
PV1 7.50 M' 0.59
PV2 7.20 M' 0.57
P1 10.00 M' 0.79
JV1 15.80 M' 1.24
JV2 5.70 M' 0.45
JV3 10.20 M' 0.80

H PEKERJAAN PINTU & JENDELA 6.98


1 Pintu PVC 1.00 unit 0.44
2 Daun Pintu & Jendela Kayu Kelas II
PV1 1.00 unit 0.87
PV2 1.00 unit 0.87
P1 2.00 unit 1.74
JV1 4.00 unit 1.74
JV2 1.00 unit 0.44
JV3 2.00 unit 0.87

I PEKERJAAN PEMASANGAN AKSESORIS PINTU & JENDELA 3.26


1 Engsel Pintu 16.00 buah 0.59
2 Engsel Jendela 21.00 buah 0.70
3 Kunci Tanam 4.00 buah 1.34
4 Slot Jendela 7.00 buah 0.28
5 Kait Angin 14.00 buah 0.35

J PEKERJAAN ATAP 12.28


1 Rangka Atap Kayu Kelas II 75.00 m² 4.52
2 Penutup Atap Spandek 75.00 m² 7.76

K PEKERJAAN PLAFOND 6.12


1 Rangka Plafond Kayu 4/4 37.00 m² 2.67
2 Plafond Gypsum 37.00 m² 2.46
3 Listplank Kayu Kls. II 49.00 m1 0.99

L PEKERJAAN SANITASI 3.54


1 Bak Mandi Fibreglass 1.00 bh 0.44
2 Kloset Jongkok 1.00 bh 0.58
3 Kran Air 1.00 bh 0.05
4 Instalasi Air Kotor & Air Bersih -
Saluran Air Bersih PVC 3/4 " 1.50 m¹ 0.04
Saluran Air Kotor PVC 2'' 1.00 m¹ 0.18
5 Saluran Septitank PVC 4'' 0.83 m¹ 0.15
6 Septitank -
Septictank 1.00 ls 2.09

M PEKERJAAN INSTALASI LISTRIK 3.94


1 Pemasangan Instalasi Listrik 7.00 Titik 0.61
2 Pemasangan Lampu SL 18 Watt 7.00 Bh 1.37
3 Pemasangan Stop Kontak 8.00 Bh 1.76
4 Pemasangan Sakelar Tunggal 5.00 Bh 0.17
5 Pemasangan Sakelar Ganda 1.00 Bh 0.03

N PEKERJAAN LANTAI KERAMIK 7.85


1 Lantai Keramik 30/30 33.00 m² 6.06
2 Lantai Teras & WC Keramik 20/20 9.00 m² 1.78

O PEKERJAAN PENGECATAN 7.89


1 Cat Dinding & Kanopi 255.38 m² 5.85
2 Cat Plafond 39.83 m² 0.91
3 Cat Pintu & Jendela 25.66 m² 0.81
4 Cat Listplang 9.85 m1 0.31

P LAIN - LAIN 0.34


1 Pekerjaan Pembersihan 77.00 m2 0.34
AN PEKERJAAN
B.S.A RESIDENCE START PROJECT : Monday, May 14, 2018
PEMBANGUNAN RUMAH TYPE 36 FINISH PROJECT : Wednesday, June 13, 2018
RUMAH CONTOH JUMLAH MINGGU : 4 MINGGU
SINTANG SISA WAKTU : WAKTU HABS
YANTO
Monday, September 03, 2018

A1 A2 A3

100.00% 100.00% 100.00%

100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00

100.00 100.00 100.00


100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00

100.00 100.00 100.00


Monday, May 14, 2018
Wednesday, June 13, 2018
4 MINGGU
WAKTU HABS
P R O G R E S
LAPORAN KEMAJUAN PEKERJAA
KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
PT. RAHADIAN MANDIRI PROPERTI LOKASI :
KONTRAKTOR :
TGL. PEMERIKSAAN :

NO U R A I A N P E K E R J A A N VOL SAT BOBOT


%

A PEKERJAAN PERSIAPAN
1 Bouplank & Pengukuran 38.00 m1 0.93

B PEKERJAAN PONDASI
1 Galian Tanah Pondasi 3.28 m3 0.11
2 Cerucuk Dia. 8 Panjang = 4 m 52.00 Btg 0.91
3 Pasir Urug Tebal 15 Cm 1.64 m³ 0.25
4 Lantai Kerja Tebal 5 cm K100 0.23 m³ 0.30
5 Pondasi Setempat -
Beton Cam 1:2:3 K 225 1.02 m³ 1.25
Pembesian 96.66 kg 1.51
Bekisting 1.25 m² 0.07
6 Urugan Tanah Kembali 1.64 m³ 0.02

C PEKERJAAN KONSTRUKSI BETON


1 Beton Sloof 15/40
Beton Cam 1:2:3 K 225 1.93 m³ 2.36
Pembesian 135.75 kg 2.12
Bekisting 6.40 m² 0.14
2 Beton Kolom Praktis 10/15 -
Beton Cam 1:2:3 K 225 0.47 m³ 0.58
Pembesian 93.44 kg 1.46
Bekisting 2.36 m² 0.09
3 Beton Kolom Struktur Praktis 15/15 -
Beton Cam 1:2:3 K 225 0.40 m³ 0.49
Pembesian 53.86 kg 0.84
Bekisting 1.75 m² 0.06
4 Beton Kolom Struktur Praktis 12/50 -
Beton Cam 1:2:3 K 225 0.46 m³ 0.56
Pembesian 38.00 kg 0.59
Bekisting 2.36 m² 0.09
5 Ring Balok 10/15
Beton Cam 1:2:3 K 225 0.66 m³ 0.80
Pembesian 129.70 kg 2.02
Bekisting 3.21 m² 0.24

D PEKERJAAN BETON LANTAI


1 Beton Plat Lantai 8 cm
Urug Tanah Bawah Lantai 0,35 cm 10.33 m³ 0.11
Urug Pasir 5 cm 2.07 m³ 0.32
Beton Cam 1:2:3 K 225 3.31 m³ 4.05

E PEKERJAAN DINDING
1 Pasang Dinding Batako 106.00 m2 9.77

F PEKERJAAN PLASTER + ACI


1 Plester Dinding 246.38 m2 6.88
2 Acian 246.38 m² 4.46

G PEKERJAAN PEMASANGAN KUSEN


1 Kusen Pintu Jendela
PV1 7.50 M' 0.59
PV2 7.20 M' 0.57
P1 10.00 M' 0.79
JV1 15.80 M' 1.24
JV2 5.70 M' 0.45
JV3 10.20 M' 0.80

H PEKERJAAN PINTU & JENDELA


1 Pintu PVC 1.00 unit 0.44
2 Daun Pintu & Jendela Kayu Kelas II -
PV1 1.00 unit 0.87
PV2 1.00 unit 0.87
P1 2.00 unit 1.74
JV1 4.00 unit 1.74
JV2 1.00 unit 0.44
JV3 2.00 unit 0.87

I PEKERJAAN PEMASANGAN AKSESORIS PINTU & JENDELA


1 Engsel Pintu 16.00 buah 0.59
2 Engsel Jendela 21.00 buah 0.70
3 Kunci Tanam 4.00 buah 1.34
4 Slot Jendela 7.00 buah 0.28
5 Kait Angin 14.00 buah 0.35

J PEKERJAAN ATAP
1 Rangka Atap Kayu Kelas II 75.00 m² 4.52
2 Penutup Atap Spandek 75.00 m² 7.76

K PEKERJAAN PLAFOND
1 Rangka Plafond Kayu 4/4 37.00 m² 2.67
2 Plafond Gypsum 37.00 m² 2.46
3 Listplank Kayu Kls. II 49.00 m1 0.99

L PEKERJAAN SANITASI
1 Bak Mandi Fibreglass 1.00 bh 0.44
2 Kloset Jongkok 1.00 bh 0.58
3 Kran Air 1.00 bh 0.05
4 Instalasi Air Kotor & Air Bersih -
Saluran Air Bersih PVC 3/4 " 1.50 m¹ 0.04
Saluran Air Kotor PVC 2'' 1.00 m¹ 0.18
5 Saluran Septitank PVC 4'' 0.83 m¹ 0.15
6 Septitank -
Septictank 1.00 ls 2.09

M PEKERJAAN INSTALASI LISTRIK


1 Pemasangan Instalasi Listrik 7.00 Titik 0.61
2 Pemasangan Lampu SL 18 Watt 7.00 Bh 1.37
3 Pemasangan Stop Kontak 8.00 Bh 1.76
4 Pemasangan Sakelar Tunggal 5.00 Bh 0.17
5 Pemasangan Sakelar Ganda 1.00 Bh 0.03

N PEKERJAAN LANTAI KERAMIK


1 Lantai Keramik 30/30 33.00 m² 6.06
2 Lantai Teras & WC Keramik 20/20 9.00 m² 1.78

O PEKERJAAN PENGECATAN
1 Cat Dinding & Kanopi 255.38 m² 5.85
2 Cat Plafond 39.83 m² 0.91
3 Cat Pintu & Jendela 25.66 m² 0.81
4 Cat Listplang 9.85 m1 0.31

P LAIN - LAIN
1 Pekerjaan Pembersihan & Carport 77.00 m2 0.34
AN PEKERJAAN
B.S.A RESIDENCE START PROJECT : Saturday, September 29, 20
PEMBANGUNAN RUMAH TYPE 36 FINISH PROJECT : Wednesday, November 28,
JUMLAH MINGGU : 8 MINGGU
SINTANG
SUBHAN
Monday, December 03, 2018

E11 E12 E13 E14 E15 E16 E22 E23 E24

38.19% 58.33% 60.56% 16.67% 60.42% 60.56% 0.00% 0.00% 16.67%

100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00

100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00


100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00

100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00


100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00

100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00


100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00 100.00

100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

50.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
100.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 100.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 50.00 0.00 50.00 50.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 50.00 0.00 50.00 50.00 0.00 0.00 0.00


0.00 0.00 50.00 0.00 50.00 50.00 0.00 0.00 0.00

0.00 50.00 60.00 0.00 50.00 60.00 0.00 0.00 0.00


0.00 50.00 50.00 0.00 50.00 50.00 0.00 0.00 0.00
0.00 50.00 50.00 0.00 50.00 50.00 0.00 0.00 0.00
0.00 50.00 50.00 0.00 50.00 50.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


Saturday, September 29, 2018
Wednesday, November 28, 2018
8 MINGGU

E25

16.67%

100.00

100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00

100.00
100.00
100.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
P R O G R E S
LAPORAN KEMAJUAN PEKERJAA
KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
PT. RAHADIAN MANDIRI PROPERTI LOKASI :
KONTRAKTOR :
TGL. PEMERIKSAAN :

NO U R A I A N P E K E R J A A N VOL SAT BOBOT


%

A PEKERJAAN PERSIAPAN
1 Bouplank & Pengukuran 38.00 m1 0.93

B PEKERJAAN PONDASI
1 Galian Tanah Pondasi 3.28 m3 0.11
2 Cerucuk Dia. 8 Panjang = 4 m 52.00 Btg 0.91
3 Pasir Urug Tebal 15 Cm 1.64 m³ 0.25
4 Lantai Kerja Tebal 5 cm K100 0.23 m³ 0.30
5 Pondasi Setempat -
Beton Cam 1:2:3 K 225 1.02 m³ 1.25
Pembesian 96.66 kg 1.51
Bekisting 1.25 m² 0.07
6 Urugan Tanah Kembali 1.64 m³ 0.02

C PEKERJAAN KONSTRUKSI BETON


1 Beton Sloof 15/40
Beton Cam 1:2:3 K 225 1.93 m³ 2.36
Pembesian 135.75 kg 2.12
Bekisting 6.40 m² 0.14
2 Beton Kolom Praktis 10/15 -
Beton Cam 1:2:3 K 225 0.47 m³ 0.58
Pembesian 93.44 kg 1.46
Bekisting 2.36 m² 0.09
3 Beton Kolom Struktur Praktis 15/15 -
Beton Cam 1:2:3 K 225 0.40 m³ 0.49
Pembesian 53.86 kg 0.84
Bekisting 1.75 m² 0.06
4 Beton Kolom Struktur Praktis 12/50 -
Beton Cam 1:2:3 K 225 0.46 m³ 0.56
Pembesian 38.00 kg 0.59
Bekisting 2.36 m² 0.09
5 Ring Balok 10/15
Beton Cam 1:2:3 K 225 0.66 m³ 0.80
Pembesian 129.70 kg 2.02
Bekisting 3.21 m² 0.24

D PEKERJAAN BETON LANTAI


1 Beton Plat Lantai 8 cm
Urug Tanah Bawah Lantai 0,35 cm 10.33 m³ 0.11
Urug Pasir 5 cm 2.07 m³ 0.32
Beton Cam 1:2:3 K 225 3.31 m³ 4.05

E PEKERJAAN DINDING
1 Pasang Dinding Batako 106.00 m2 9.77

F PEKERJAAN PLASTER + ACI


1 Plester Dinding 246.38 m2 6.88
2 Acian 246.38 m² 4.46

G PEKERJAAN PEMASANGAN KUSEN


1 Kusen Pintu Jendela
PV1 7.50 M' 0.59
PV2 7.20 M' 0.57
P1 10.00 M' 0.79
JV1 15.80 M' 1.24
JV2 5.70 M' 0.45
JV3 10.20 M' 0.80

H PEKERJAAN PINTU & JENDELA


1 Pintu PVC 1.00 unit 0.44
2 Daun Pintu & Jendela Kayu Kelas II -
PV1 1.00 unit 0.87
PV2 1.00 unit 0.87
P1 2.00 unit 1.74
JV1 4.00 unit 1.74
JV2 1.00 unit 0.44
JV3 2.00 unit 0.87

I PEKERJAAN PEMASANGAN AKSESORIS PINTU & JENDELA


1 Engsel Pintu 16.00 buah 0.59
2 Engsel Jendela 21.00 buah 0.70
3 Kunci Tanam 4.00 buah 1.34
4 Slot Jendela 7.00 buah 0.28
5 Kait Angin 14.00 buah 0.35

J PEKERJAAN ATAP
1 Rangka Atap Kayu Kelas II 75.00 m² 4.52
2 Penutup Atap Spandek 75.00 m² 7.76

K PEKERJAAN PLAFOND
1 Rangka Plafond Kayu 4/4 37.00 m² 2.67
2 Plafond Gypsum 37.00 m² 2.46
3 Listplank Kayu Kls. II 49.00 m1 0.99

L PEKERJAAN SANITASI
1 Bak Mandi Fibreglass 1.00 bh 0.44
2 Kloset Jongkok 1.00 bh 0.58
3 Kran Air 1.00 bh 0.05
4 Instalasi Air Kotor & Air Bersih -
Saluran Air Bersih PVC 3/4 " 1.50 m¹ 0.04
Saluran Air Kotor PVC 2'' 1.00 m¹ 0.18
5 Saluran Septitank PVC 4'' 0.83 m¹ 0.15
6 Septitank -
Septictank 1.00 ls 2.09

M PEKERJAAN INSTALASI LISTRIK


1 Pemasangan Instalasi Listrik 7.00 Titik 0.61
2 Pemasangan Lampu SL 18 Watt 7.00 Bh 1.37
3 Pemasangan Stop Kontak 8.00 Bh 1.76
4 Pemasangan Sakelar Tunggal 5.00 Bh 0.17
5 Pemasangan Sakelar Ganda 1.00 Bh 0.03

N PEKERJAAN LANTAI KERAMIK


1 Lantai Keramik 30/30 33.00 m² 6.06
2 Lantai Teras & WC Keramik 20/20 9.00 m² 1.78

O PEKERJAAN PENGECATAN
1 Cat Dinding & Kanopi 255.38 m² 5.85
2 Cat Plafond 39.83 m² 0.91
3 Cat Pintu & Jendela 25.66 m² 0.81
4 Cat Listplang 9.85 m1 0.31

P LAIN - LAIN
1 Pekerjaan Pembersihan & Carport 77.00 m2 0.34
AN PEKERJAAN
B.S.A RESIDENCE START PROJECT : Saturday, September 29, 201
PEMBANGUNAN RUMAH TYPE 36 FINISH PROJECT : Wednesday, November 28, 2
JUMLAH MINGGU : 8 MINGGU
SINTANG
SUBHAN
Monday, December 03, 2018

E26 E27 E28 E29 E30 E31 E32 E33 E34

16.67% 16.67% 52.78% 12.50% 58.33% 58.33% 19.44% 19.44% 19.44%

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00


100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00


100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

100.00 100.00 100.00 0.00 100.00 100.00 100.00 100.00 100.00


100.00 100.00 100.00 0.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 0.00 100.00 100.00 100.00 100.00 100.00

0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00


0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00
0.00 0.00 100.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 100.00 100.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 100.00 100.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 50.00 50.00 50.00 50.00 50.00
0.00 0.00 0.00 0.00 50.00 50.00 50.00 50.00 50.00
0.00 0.00 0.00 0.00 50.00 50.00 50.00 50.00 50.00
0.00 0.00 0.00 0.00 50.00 50.00 50.00 50.00 50.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


Saturday, September 29, 2018
Wednesday, November 28, 2018
8 MINGGU

E35

0.00%

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
P R O G R E S
LAPORAN KEMAJUAN PEKERJAA
KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
PT. RAHADIAN MANDIRI PROPERTI LOKASI :
KONTRAKTOR :
TGL. PEMERIKSAAN :

NO U R A I A N P E K E R J A A N VOL SAT BOBOT


%

A PEKERJAAN PERSIAPAN
1 Bouplank & Pengukuran 38.00 m1 0.93

B PEKERJAAN PONDASI
1 Galian Tanah Pondasi 3.28 m3 0.11
2 Cerucuk Dia. 8 Panjang = 4 m 52.00 Btg 0.91
3 Pasir Urug Tebal 15 Cm 1.64 m³ 0.25
4 Lantai Kerja Tebal 5 cm K100 0.23 m³ 0.30
5 Pondasi Setempat -
Beton Cam 1:2:3 K 225 1.02 m³ 1.25
Pembesian 96.66 kg 1.51
Bekisting 1.25 m² 0.07
6 Urugan Tanah Kembali 1.64 m³ 0.02

C PEKERJAAN KONSTRUKSI BETON


1 Beton Sloof 15/40
Beton Cam 1:2:3 K 225 1.93 m³ 2.36
Pembesian 135.75 kg 2.12
Bekisting 6.40 m² 0.14
2 Beton Kolom Praktis 10/15 -
Beton Cam 1:2:3 K 225 0.47 m³ 0.58
Pembesian 93.44 kg 1.46
Bekisting 2.36 m² 0.09
3 Beton Kolom Struktur Praktis 15/15 -
Beton Cam 1:2:3 K 225 0.40 m³ 0.49
Pembesian 53.86 kg 0.84
Bekisting 1.75 m² 0.06
4 Beton Kolom Struktur Praktis 12/50 -
Beton Cam 1:2:3 K 225 0.46 m³ 0.56
Pembesian 38.00 kg 0.59
Bekisting 2.36 m² 0.09
5 Ring Balok 10/15
Beton Cam 1:2:3 K 225 0.66 m³ 0.80
Pembesian 129.70 kg 2.02
Bekisting 3.21 m² 0.24

D PEKERJAAN BETON LANTAI


1 Beton Plat Lantai 8 cm
Urug Tanah Bawah Lantai 0,35 cm 10.33 m³ 0.11
Urug Pasir 5 cm 2.07 m³ 0.32
Beton Cam 1:2:3 K 225 3.31 m³ 4.05

E PEKERJAAN DINDING
1 Pasang Dinding Batako 106.00 m2 9.77

F PEKERJAAN PLASTER + ACI


1 Plester Dinding 246.38 m2 6.88
2 Acian 246.38 m² 4.46

G PEKERJAAN PEMASANGAN KUSEN


1 Kusen Pintu Jendela
PV1 7.50 M' 0.59
PV2 7.20 M' 0.57
P1 10.00 M' 0.79
JV1 15.80 M' 1.24
JV2 5.70 M' 0.45
JV3 10.20 M' 0.80

H PEKERJAAN PINTU & JENDELA


1 Pintu PVC 1.00 unit 0.44
2 Daun Pintu & Jendela Kayu Kelas II -
PV1 1.00 unit 0.87
PV2 1.00 unit 0.87
P1 2.00 unit 1.74
JV1 4.00 unit 1.74
JV2 1.00 unit 0.44
JV3 2.00 unit 0.87

I PEKERJAAN PEMASANGAN AKSESORIS PINTU & JENDELA


1 Engsel Pintu 16.00 buah 0.59
2 Engsel Jendela 21.00 buah 0.70
3 Kunci Tanam 4.00 buah 1.34
4 Slot Jendela 7.00 buah 0.28
5 Kait Angin 14.00 buah 0.35

J PEKERJAAN ATAP
1 Rangka Atap Kayu Kelas II 75.00 m² 4.52
2 Penutup Atap Spandek 75.00 m² 7.76

K PEKERJAAN PLAFOND
1 Rangka Plafond Kayu 4/4 37.00 m² 2.67
2 Plafond Gypsum 37.00 m² 2.46
3 Listplank Kayu Kls. II 49.00 m1 0.99

L PEKERJAAN SANITASI
1 Bak Mandi Fibreglass 1.00 bh 0.44
2 Kloset Jongkok 1.00 bh 0.58
3 Kran Air 1.00 bh 0.05
4 Instalasi Air Kotor & Air Bersih -
Saluran Air Bersih PVC 3/4 " 1.50 m¹ 0.04
Saluran Air Kotor PVC 2'' 1.00 m¹ 0.18
5 Saluran Septitank PVC 4'' 0.83 m¹ 0.15
6 Septitank -
Septictank 1.00 ls 2.09

M PEKERJAAN INSTALASI LISTRIK


1 Pemasangan Instalasi Listrik 7.00 Titik 0.61
2 Pemasangan Lampu SL 18 Watt 7.00 Bh 1.37
3 Pemasangan Stop Kontak 8.00 Bh 1.76
4 Pemasangan Sakelar Tunggal 5.00 Bh 0.17
5 Pemasangan Sakelar Ganda 1.00 Bh 0.03

N PEKERJAAN LANTAI KERAMIK


1 Lantai Keramik 30/30 33.00 m² 6.06
2 Lantai Teras & WC Keramik 20/20 9.00 m² 1.78

O PEKERJAAN PENGECATAN
1 Cat Dinding & Kanopi 255.38 m² 5.85
2 Cat Plafond 39.83 m² 0.91
3 Cat Pintu & Jendela 25.66 m² 0.81
4 Cat Listplang 9.85 m1 0.31

P LAIN - LAIN
1 Pekerjaan Pembersihan 77.00 m2 0.34
AN PEKERJAAN
B.S.A RESIDENCE START PROJECT : Wednesday, August 15, 2018
PEMBANGUNAN RUMAH TYPE 36 FINISH PROJECT : Saturday, September 29,
03-BGN-T36/BSA/RMP/VIII/2018 JUMLAH MINGGU : 6 MINGGU
SINTANG SISA WAKTU : 37 HARI KALENDER
YANTO
Thursday, August 23, 2018

C4 C5 C6 C7 C8 C9 C10 C11 C12

20.14% 20.14% 24.31% 24.31% 24.31% 24.31% 37.92% 20.14% 20.14%

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00


100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00


100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00


100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00

0.00 0.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00


0.00 0.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00
0.00 0.00 100.00 100.00 100.00 100.00 100.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00


100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00

0.00 0.00 0.00 0.00 0.00 0.00 70.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


Wednesday, August 15, 2018
Saturday, September 29, 2018
6 MINGGU
37 HARI KALENDER

C13

20.14%

100.00

100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00

100.00
100.00
100.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

100.00
100.00
50.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
P R O G R E S
LAPORAN KEMAJUAN PEKERJAA
KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
PT. RAHADIAN MANDIRI PROPERTI LOKASI :
KONTRAKTOR :
TGL. PEMERIKSAAN :

NO U R A I A N P E K E R J A A N VOL SAT BOBOT


%

A PEKERJAAN PERSIAPAN
1 Bouplank & Pengukuran 38.00 m1 0.93

B PEKERJAAN PONDASI
1 Galian Tanah Pondasi 3.28 m3 0.11
2 Cerucuk Dia. 8 Panjang = 4 m 52.00 Btg 0.91
3 Pasir Urug Tebal 15 Cm 1.64 m³ 0.25
4 Lantai Kerja Tebal 5 cm K100 0.23 m³ 0.30
5 Pondasi Setempat -
Beton Cam 1:2:3 K 225 1.02 m³ 1.25
Pembesian 96.66 kg 1.51
Bekisting 1.25 m² 0.07
6 Urugan Tanah Kembali 1.64 m³ 0.02

C PEKERJAAN KONSTRUKSI BETON


1 Beton Sloof 15/40
Beton Cam 1:2:3 K 225 1.93 m³ 2.36
Pembesian 135.75 kg 2.12
Bekisting 6.40 m² 0.14
2 Beton Kolom Praktis 10/15 -
Beton Cam 1:2:3 K 225 0.47 m³ 0.58
Pembesian 93.44 kg 1.46
Bekisting 2.36 m² 0.09
3 Beton Kolom Struktur Praktis 15/15 -
Beton Cam 1:2:3 K 225 0.40 m³ 0.49
Pembesian 53.86 kg 0.84
Bekisting 1.75 m² 0.06
4 Beton Kolom Struktur Praktis 12/50 -
Beton Cam 1:2:3 K 225 0.46 m³ 0.56
Pembesian 38.00 kg 0.59
Bekisting 2.36 m² 0.09
5 Ring Balok 10/15
Beton Cam 1:2:3 K 225 0.66 m³ 0.80
Pembesian 129.70 kg 2.02
Bekisting 3.21 m² 0.24

D PEKERJAAN BETON LANTAI


1 Beton Plat Lantai 8 cm
Urug Tanah Bawah Lantai 0,35 cm 10.33 m³ 0.11
Urug Pasir 5 cm 2.07 m³ 0.32
Beton Cam 1:2:3 K 225 3.31 m³ 4.05

E PEKERJAAN DINDING
1 Pasang Dinding Batako 106.00 m2 9.77

F PEKERJAAN PLASTER + ACI


1 Plester Dinding 246.38 m2 6.88
2 Acian 246.38 m² 4.46

G PEKERJAAN PEMASANGAN KUSEN


1 Kusen Pintu Jendela
PV1 7.50 M' 0.59
PV2 7.20 M' 0.57
P1 10.00 M' 0.79
JV1 15.80 M' 1.24
JV2 5.70 M' 0.45
JV3 10.20 M' 0.80

H PEKERJAAN PINTU & JENDELA


1 Pintu PVC 1.00 unit 0.44
2 Daun Pintu & Jendela Kayu Kelas II -
PV1 1.00 unit 0.87
PV2 1.00 unit 0.87
P1 2.00 unit 1.74
JV1 4.00 unit 1.74
JV2 1.00 unit 0.44
JV3 2.00 unit 0.87

I PEKERJAAN PEMASANGAN AKSESORIS PINTU & JENDELA


1 Engsel Pintu 16.00 buah 0.59
2 Engsel Jendela 21.00 buah 0.70
3 Kunci Tanam 4.00 buah 1.34
4 Slot Jendela 7.00 buah 0.28
5 Kait Angin 14.00 buah 0.35

J PEKERJAAN ATAP
1 Rangka Atap Kayu Kelas II 75.00 m² 4.52
2 Penutup Atap Spandek 75.00 m² 7.76

K PEKERJAAN PLAFOND
1 Rangka Plafond Kayu 4/4 37.00 m² 2.67
2 Plafond Gypsum 37.00 m² 2.46
3 Listplank Kayu Kls. II 49.00 m1 0.99

L PEKERJAAN SANITASI
1 Bak Mandi Fibreglass 1.00 bh 0.44
2 Kloset Jongkok 1.00 bh 0.58
3 Kran Air 1.00 bh 0.05
4 Instalasi Air Kotor & Air Bersih -
Saluran Air Bersih PVC 3/4 " 1.50 m¹ 0.04
Saluran Air Kotor PVC 2'' 1.00 m¹ 0.18
5 Saluran Septitank PVC 4'' 0.83 m¹ 0.15
6 Septitank -
Septictank 1.00 ls 2.09

M PEKERJAAN INSTALASI LISTRIK


1 Pemasangan Instalasi Listrik 7.00 Titik 0.61
2 Pemasangan Lampu SL 18 Watt 7.00 Bh 1.37
3 Pemasangan Stop Kontak 8.00 Bh 1.76
4 Pemasangan Sakelar Tunggal 5.00 Bh 0.17
5 Pemasangan Sakelar Ganda 1.00 Bh 0.03

N PEKERJAAN LANTAI KERAMIK


1 Lantai Keramik 30/30 33.00 m² 6.06
2 Lantai Teras & WC Keramik 20/20 9.00 m² 1.78

O PEKERJAAN PENGECATAN
1 Cat Dinding & Kanopi 255.38 m² 5.85
2 Cat Plafond 39.83 m² 0.91
3 Cat Pintu & Jendela 25.66 m² 0.81
4 Cat Listplang 9.85 m1 0.31

P LAIN - LAIN
1 Pekerjaan Pembersihan 77.00 m2 0.34
AN PEKERJAAN
B.S.A RESIDENCE START PROJECT : Wednesday, August 15, 2018
PEMBANGUNAN RUMAH TYPE 36 FINISH PROJECT : Saturday, September 29,
04-BGN-T36/BSA/RMP/VIII/2018 JUMLAH MINGGU : 6 MINGGU
SINTANG SISA WAKTU : 37 HARI KALENDER
YANTO
Thursday, August 23, 2018

C14 C15 C16 C17 D11 D12 D13 D14 D15

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


Wednesday, August 15, 2018
Saturday, September 29, 2018
6 MINGGU
37 HARI KALENDER

D16

0.00%

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN
No Uraian Tenaga Kerja Satuan

A. UPAH
1 Mandor Lapangan L 061
1 Kepala Tukang L 073
2 Tukang L 079
3 Buruh Lapangan Tak Terlatih L 101

No Uraian Bahan Satuan

B. BAHAN PENGISI
1 Batu pecah 1-2 cm M³
2 Pasir M³
3 Semen PC Zak
5 Bataco 20 x 40 x 7 cm ( press ) Bh
6 Keramik 20 x 20 cm Kotak
7 Keramik 30 x 30 cm Kotak
C. BAHAN KAYU
1 Ky. klas II uk. 5/7 - 4 M ( tdk ketam ) M³
2 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³
3 Papan kayu klas II tdk ketam M³
4 Papan mal klas III M³
5 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg
D. BAHAN CAT
1 Cat kilat Kg
2 Cat dasar Kg
3 Cat tembok Kg
4 Dempul Kg
5 Meni Kg
6 Oker Kg
7 Lem Kayu Kg
8 Sealent Tube
E. BAHAN BESI DAN ALUMINIUM
1 Besi Tulangan Beton Kg
2 Kawat baja/bendrat Kg
3 Pipa galvanis dia 4" Btg
5 Kusen m'
F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC Bh
2 Engsel pintu Bh
3 Slot jendela Bh
4 Kunci tanam biasa Bh
5 Paku campuran 1" - 5 " Kg
6 Paku beton Kg
7 Paku GRC Kg
8 Sekrup Gypsum Kg
9 Sekrup Fixer Bh
G. BAHAN ATAP
1 Penutup Atap Spandek Lbr
H. BAHAN KACA
1 Kaca Polos, t = 5 mm M²
I. BAHAN TRIPLEK
No Uraian Bahan Satuan

1 Panel GRC 120 x 240 x 40 Lbr


2 GypsumBoard t = 9mm Lbr
J. BAHAN SANITASI
5 Kloset jongkok (setaraf INA) Bh
2 Kran air Bh
4 Pipa paralon dia 3/4" Btg
6 Pipa paralon dia 2" Btg
3 Pipa paralon dia 4" Btg
K. BAHAN MINYAK DAN BAHAN PELENGKAP ALAT BERAT
1 Minyak solar Ltr
57,546,102.11

Harga Upah

61,665.00
61,665.00
61,665.00
61,665.00

Harga Bahan

500,000.00
85,000.00
70,000.00
3,000.00
60,000.00
60,000.00

1,500,000.00
1,500,000.00
1,500,000.00
1,500,000.00
10,000.00

30,000.00
30,000.00
24,000.00
25,000.00
30,000.00
50,000.00
15,000.00
100,000.00

9,000.00
9,500.00
1,021,597.50
45,000.00

250,000.00
10,000.00
8,000.00
160,000.00
18,000.00
20,000.00
22,000.00
117,659.85
2,007.97

44,000.00

125,000.00
Harga Bahan

67,000.00
53,000.00

250,000.00
20,000.00
26,715.00
80,000.00
230,000.00

7,000.00
A. PEKERJAAN PERSIAPAN (P.Ps)

1m1 Pengukuran dan Pemasangan Bouwplank (P.Ps. 02)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 0.100
2 Pekerja OH 61,665.00 0.500
3 Kepala Tukang OH 61,665.00 0.005
4 Mandor OH 61,665.00 0.005
Jumlah 20%
B BAHAN
1 Kayu Pancang (Dolken) d = 6-8 cm, p = 4m Btg 10,000.00 0.500
2 Paku Kg 18,000.00 0.020
3 Papan Kayu Kelas III M3 1,500,000.00 0.005
Jumlah 50%
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.4

Pekerjaan Persiapan 107


BIAYA
SATUAN
( Rp. )
6

6,166.50
30,832.50
308.33
308.33
7,523.13

5,000.00
360.00
7,500.00
6,430.00
13,953.13
13,953.13

Pekerjaan Persiapan 108


M. PEKERJAAN LANTAI & DINDING (P.LD.)

Memasang 1m2 Lantai Keramik ukuran (20 x 20) cm (P.LD. 01)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 61,665.00
2 Tukang Batu OH 61,665.00
3 Kepala Tukang OH 61,665.00
4 Mandor OH 61,665.00
Jumlah 51.68%
B BAHAN
1 Ubin keramik Bh 2,400.00
2 Portland Cement (PC) Kg 1,400.00
3 Pasir Pasang M3 85,000.00
4 Semen Warna Kg 65,000.00

C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0012-2007
Memasang 1m2 Lantai Keramik ukuran (30 x 30) cm (P.LD. 02)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 61,665.00
2 Tukang Batu OH 61,665.00
3 Kepala Tukang OH 61,665.00
4 Mandor OH 61,665.00
Jumlah 37%
B BAHAN
1 Ubin keramik Bh 6,666.67
2 Portland Cement (PC) Kg 1,400.00
3 Pasir Pasang M3 85,000.00
4 Semen Warna Kg 50,000.00

C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0012-2007

1m2 Pasang Lantai Keramik 40 x 40cm Polos (P.LD. 03)

Pekerjaan Penutup Lantai Dnding 109


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 61,665.00
2 Tukang Batu OH 61,665.00
3 Kepala Tukang OH 61,665.00
4 Mandor OH 61,665.00
Jumlah
B BAHAN
1 Keramik 40 x 40cm Polos Bh
2 Semen Portland Kg 1,400.00
3 Pasir Pasang 3 85,000.00
M
4 Semen Warna Kg 50,000.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.47
1m2 Pasang Dinding Keramik 20 x 25cm (P.LD. 08)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 61,665.00
2 Tukang Batu OH 61,665.00
3 Kepala Tukang OH 61,665.00
4 Mandor OH 61,665.00
Jumlah
B BAHAN
1 Keramik 20 x 25 cm Bh
2 Semen Kg 1,400.00
3 Pasir Pasang M3 85,000.00
4 Oker Pengisi Nat Keramik Kg 50,000.00

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.63

1m2 Pasang Dinding Keramik 60 x 60cm (P.LD. 04.a)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja Tidak Terlatih OH Pekerjaan Penutup Lantai Dnding
50,000.00 110
2 Tukang Batu OH 77,000.00
3 Kepala Tukang OH 82,500.00
DING (P.LD.)

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.600 36,999.00
0.300 18,499.50
0.030 1,849.95
0.030 1,849.95
30,593.73

25.000 60,000.00
9.000 12,600.00
0.045 3,825.00
0.1000 6,500.00
82,925.00
113,518.73
113,518.73
95000

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.700 43,165.50
0.250 15,416.25
0.000 0.00
0.000 0.00
21,675.25

10.500 70,000.00
7.000 9,800.00
0.045 3,825.00
0.0000 0.00
83,625.00
105,300.25
105,300.25
130000

Pekerjaan Penutup Lantai Dnding 111


BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.620 38,232.30
0.350 21,582.75
0.035 2,158.28
0.030 1,849.95
63,823.28

6.250
11.380 15,932.00
0.042 3,570.00
0.1500 7,500.00

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.600 36,999.00
0.450 27,749.25
0.045 2,774.93
0.030 1,849.95
0.565 39,181.94

10.000
13.950 19,530.00
0.027 2,295.00
0.300 15,000.00

105000

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.620 31,000.00 Pekerjaan Penutup Lantai Dnding 112


0.350 26,950.00
0.035 2,887.50
D. PEKERJAAN BETON BERTULANG (P.BB.)

Membuat 1m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 (P.BB.
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.500
2 Tukang Batu OH 61,665.00 0.150
3 Kepala Tukang OH 61,665.00 0.015
4 Mandor OH 61,665.00 0.050
Jumlah
B BAHAN
1 Semen Portland Kg 1,400.00 200.000
2 Pasir Kg 60.71 850.000
3 Batu pecah 1-2 cm (Kerikil) Kg 370.37 1,000.000
4 Air Liter 0.00 0.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Membuat 1m3 Beton Mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87 (P.BB. 02)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.650
2 Tukang Batu OH 61,665.00 0.275
3 Kepala Tukang OH 61,665.00 0.028
4 Mandor OH 61,665.00 0.083
Jumlah
B BAHAN
1 Semen Portland Kg 1,400.00 247.000
2 Pasir Kg 60.71 869.000
3 Batu pecah 1-2 cm (Kerikil) Kg 370.37 999.000
4 Air Liter 0.00 0.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 113


Membuat 1m3 Beton Mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 (P.BB. 03)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.650
2 Tukang Batu OH 61,665.00 0.275
3 Kepala Tukang OH 61,665.00 0.028
4 Mandor OH 61,665.00 0.083
Jumlah
B BAHAN
1 Semen Portland Kg 1,400.00 326.000
2 Pasir Kg 60.71 760.000
3 Batu pecah 1-2 cm (Kerikil) Kg 370.37 1,029.000
4 Air Liter 0.00 0.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

Pekerjaan Beton Bertulang 114


Membeli dan Mengerjakan 1m3 Beton Ready Mix K 175 (P.BB. 03.a)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.650
2 Tukang Batu OH 61,665.00 0.275
3 Kepala Tukang OH 61,665.00 0.028
4 Mandor OH 61,665.00 0.083
Jumlah
Jumlah Upah 25%
B BAHAN
1 Beton Ready Mix 175 M³ z 1.000
Jumlah
C ALAT
1 Sewa Pompa Ready Mix (Min. 100 M³) M³ z 1.000
Jumlah
D Jumlah A + B + C
E Harga Satuan
Acuan : SNI DT 91-0008-2007

Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (P.BB. 04)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.650
2 Tukang Batu OH 61,665.00 0.275
3 Kepala Tukang OH 61,665.00 0.028
4 Mandor OH 61,665.00 0.083
Jumlah 60%
B BAHAN
1 Semen Portland Kg 1,400.00 250.000
2 Pasir Kg 60.71 900.000
3 Batu pecah 1-2 cm (Kerikil) Kg 370.37 600.000
4 Air Liter 0.00 0.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

Pekerjaan Beton Bertulang 115


Membeli dan Mengerjakan 1m3 Beton Ready Mix K 225 (P.BB. 04.a)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.650
2 Tukang Batu OH 61,665.00 0.275
3 Kepala Tukang OH 61,665.00 0.028
4 Mandor OH 61,665.00 0.083
Jumlah
Jumlah Upah 25%
B BAHAN
1 Beton Ready Mix 225 M³ z 1.000
Jumlah
C ALAT
1 Sewa Pompa Ready Mix (Min. 100 M³) M³ z 1.000
Jumlah
D Jumlah A + B + C
E Harga Satuan
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 116


Membuat 1m3 Beton Mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 (P.BB. 05)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.650
2 Tukang Batu OH 61,665.00 0.275
3 Kepala Tukang OH 61,665.00 0.028
4 Mandor OH 61,665.00 0.083
Jumlah
B BAHAN
1 Semen Portland Kg 1,400.00 384.000
2 Pasir Kg 60.71 692.000
3 Batu pecah 1-2 cm (Kerikil) Kg 370.37 1,039.000
4 Air Liter 0.00 0.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Membuat 1m3 Beton Mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 (P.BB. 06)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.650
2 Tukang Batu OH 61,665.00 0.275
3 Kepala Tukang OH 61,665.00 0.028
4 Mandor OH 61,665.00 0.083
Jumlah
B BAHAN
1 Semen Portland Kg 1,400.00 413.000
2 Pasir Kg 60.71 681.000
3 Batu pecah 1-2 cm (Kerikil) Kg 370.37 1,021.000
4 Air Liter 0.00 0.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

Pekerjaan Beton Bertulang 117


Membeli dan Mengerjakan 1m3 Beton Ready Mix K 300 (P.BB. 06.a)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.650
2 Tukang Batu OH 61,665.00 0.275
3 Kepala Tukang OH 61,665.00 0.028
4 Mandor OH 61,665.00 0.083
Jumlah
Jumlah Upah 25%
B BAHAN
1 Beton Ready Mix 300 M³ z 1.000
Jumlah
C ALAT
1 Sewa Pompa Ready Mix (Min. 100 M³) M³ z 1.000
Jumlah
D Jumlah A + B + C
E Harga Satuan
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 118


Pembesian 10Kg dengan Besi Polos atau Ulir (P.BB. 07)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.060
2 Tukang Besi OH 61,665.00 0.060
3 Kepala Tukang OH 61,665.00 0.006
4 Mandor OH 61,665.00 0.003
Jumlah
B BAHAN
1 Besi Beton (polos/ulir) Kg 9,000.00 9.000
2 Kawat Ikat Beton (bendrat) Kg 9,500.00 0.050
Jumlah
C Jumlah A + B
D Harga Satuan
E Harga Satuan per 1 Kg
Acuan : SNI DT 91-0008-2007

Memasang 10Kg Jaring Kawat Baja/Wire Mesh (P.BB. 08)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.0250
2 Tukang Besi OH 61,665.00 0.0250
3 Kepala Tukang OH 61,665.00 0.0250
4 Mandor OH 61,665.00 0.0010
Jumlah
B BAHAN
1 Besi Wire Mesh M 5 Kg 0.00 10.200
2 Kawat Ikat Beton (bendrat) Kg 9,500.00 0.050
Jumlah
C Jumlah A + B
D Harga Satuan
E Harga Satuan per 1 Kg
Acuan : SNI DT 91-0008-2007

Memasang 1m2 Bekisting untuk Pondasi (P.BB. 09)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS

Pekerjaan Beton Bertulang 119


No. URAIAN PEKERJAAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.500
2 Tukang Kayu OH 61,665.00 0.200
3 Kepala Tukang OH 61,665.00 0.020
4 Mandor OH 61,665.00 0.020
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.020
2 Paku 2" - 5" Kg 18,000.00 0.300
3 Minyak Bekisting Lt 7,000.00 0.100
Jumlah
C Jumlah A + B
D Harga Satuan 40%
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 120


Memasang 1m2 Bekisting untuk Pondasi (P.BB. 09.a)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.520
2 Tukang Kayu OH 61,665.00 0.260
3 Kepala Tukang OH 61,665.00 0.026
4 Mandor OH 61,665.00 0.026
Jumlah
Jumlah Upah 50%
B BAHAN
1 Papan Mal Kelas III M3 1,500,000.00 0.031
2 Paku 2" - 5" Kg 18,000.00 0.300
3 Minyak Bekisting Lt 7,000.00 0.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Memasang 1m2 Bekisting untuk Sloof (P.BB. 10)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.520
2 Tukang Kayu OH 61,665.00 0.260
3 Kepala Tukang OH 61,665.00 0.026
4 Mandor OH 61,665.00 0.026
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.045
2 Paku 2" - 5" Kg 18,000.00 0.300
3 Minyak Bekisting Lt 0.00 0.100
Jumlah
C Jumlah A + B
D Harga Satuan 10%
Acuan : SNI DT 91-0008-2007

Memasang 1m2 Bekisting untuk Kolom (P.BB. 11)


HARGA
No. URAIAN PEKERJAAN SATUAN KUANTITAS

Pekerjaan Beton Bertulang 121


No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.660
2 Tukang Kayu OH 61,665.00 0.330
3 Kepala Tukang OH 61,665.00 0.033
4 Mandor OH 61,665.00 0.033
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.040
2 Paku 2" - 5" Kg 18,000.00 0.400
3 Minyak Bekisting Lt 7,000.00 0.200
4 Balok Kayu Kelas II M3 z 0.015
5 Triplek t = 9mm Lbr z 0.350
6 Cerucuk Ǿ 8 - 10cm / 4m Btg z 2.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 122


1m2 Pasang Bekisting untuk Kolom (P.BB. 11.a)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.660
2 Tukang Kayu OH 61,665.00 0.330
3 Kepala Tukang OH 61,665.00 0.033
4 Mandor OH 61,665.00 0.033
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.055
2 Paku 2" - 5" Kg 18,000.00 0.400
3 Minyak Bekisting Lt 7,000.00 0.000
4 Papan Mal M3 1,500,000.00 0.022
5 Cerucuk Ǿ 6 - 8cm / 4m Btg 10,000.00 2.000
Jumlah
C Jumlah A + B
D Harga Satuan 10%
Acuan : SNI DT 91-0008-2007

Memasang 1m2 Bekisting untuk Balok (P.BB. 12)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.660
2 Tukang Kayu OH 61,665.00 0.330
3 Kepala Tukang OH 61,665.00 0.033
4 Mandor OH 61,665.00 0.033
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.040
2 Paku 2" - 5" Kg 18,000.00 0.400
3 Minyak Bekisting Lt 7,000.00 0.200
4 Balok Kayu Kelas II M3 z 0.018
5 Triplek t = 9mm Lbr z 0.350
6 Cerucuk Ǿ 8 - 10cm / 4m Btg z 2.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 123


1m2 Pasang Bekisting untuk Balok (P.BB. 12.a)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.660
2 Tukang Kayu OH 61,665.00 0.330
3 Kepala Tukang OH 61,665.00 0.033
4 Mandor OH 61,665.00 0.033
Jumlah
B BAHAN
1 Paku 2" - 5" Kg 18,000.00 0.400
2 Minyak Bekisting Lt 7,000.00 0.000
3 Balok Kayu Kelas III M3 1,500,000.00 0.058
4 Papan Mal M3 1,500,000.00 0.022
5 Cerucuk Ǿ 6 - 8cm / 4m Btg 10,000.00 2.000
Jumlah
C Jumlah A + B
D Harga Satuan 20%
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 124


Memasang 1m2 Bekisting untuk Lantai (P.BB. 13)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.660
2 Tukang Kayu OH 61,665.00 0.330
3 Kepala Tukang OH 61,665.00 0.033
4 Mandor OH 61,665.00 0.033
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.040
2 Paku 2" - 5" Kg 18,000.00 0.400
3 Minyak Bekisting Lt 7,000.00 0.200
4 Balok Kayu Kelas II M3 z 0.015
5 Triplek t = 9mm Lbr z 0.350
6 Cerucuk Ǿ 8 - 10cm / 4m Btg z 6.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

1m2 Pasang Bekisting untuk Lantai (P.BB. 13.a)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.660
2 Tukang Kayu OH 61,665.00 0.330
3 Kepala Tukang OH 61,665.00 0.033
4 Mandor OH 61,665.00 0.033
Jumlah
B BAHAN
1 Paku 2" - 5" Kg 18,000.00 0.400
2 Minyak Bekisting Lt 7,000.00 0.000
3 Balok Kayu Kelas III M3 1,500,000.00 0.055
4 Papan Mal M3 1,500,000.00 0.022
5 Cerucuk Ǿ 6 - 8cm / 4m Btg 10,000.00 6.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 125


Memasang 1m2 Bekisting untuk Tangga (P.BB. 14)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.660
2 Tukang Kayu OH 61,665.00 0.330
3 Kepala Tukang OH 61,665.00 0.033
4 Mandor OH 61,665.00 0.033
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.030
2 Paku 2" - 5" Kg 18,000.00 0.400
3 Minyak Bekisting Lt 7,000.00 0.150
4 Balok Kayu Kelas II M3 z 0.015
5 Triplek t = 9mm Lbr z 0.350
6 Cerucuk Ǿ 8 - 10cm / 4m Btg z 2.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 126


Memasang 1m2 Jembatan untuk Pengecoran Beton (P.BB. 15)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.150
2 Tukang Kayu OH 61,665.00 0.050
3 Kepala Tukang OH 61,665.00 0.005
4 Mandor OH 61,665.00 0.008
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.0264
2 Paku 2" - 5" Kg 18,000.00 0.600
3 Cerucuk Ǿ 8 - 10cm / 4m Btg z 0.500
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Membuat 1m3 Pondasi Beton Bertulang (150 kg besi + bekisting) (P.BB. 16)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 5.300
2 Tukang Batu OH 61,665.00 0.275
3 Tukang Kayu OH 61,665.00 1.300
4 Tukang Besi OH 61,665.00 1.050
5 Kepala Tukang OH 61,665.00 0.262
6 Mandor OH 61,665.00 0.265
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.200
2 Paku 2" - 5" Kg 18,000.00 1.500
3 Minyak Bekisting Lt 7,000.00 0.400
4 Besi Beton Polos Kg 9,000.00 157.500
5 Kawat Ikat Beton (bendrat) Kg 9,500.00 2.250
6 Semen Portland Kg 1,400.00 336.000
7 Pasir M3 85,000.00 0.540
8 Batu pecah 1-2 cm (Kerikil) M3 500,000.00 0.810
Jumlah
C Jumlah A + B
D Harga Satuan

Pekerjaan Beton Bertulang 127


Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 128


Membuat 1m3 Sloof Beton Bertulang (200 kg besi + bekisting) (P.BB. 17)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 5.650
2 Tukang Batu OH 61,665.00 0.275
3 Tukang Kayu OH 61,665.00 1.560
4 Tukang Besi OH 61,665.00 1.400
5 Kepala Tukang OH 61,665.00 0.323
6 Mandor OH 61,665.00 0.283
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.270
2 Paku 2" - 5" Kg 18,000.00 2.000
3 Minyak Bekisting Lt 7,000.00 0.600
4 Besi Beton Polos Kg 9,000.00 210.000
5 Kawat Ikat Beton (bendrat) Kg 9,500.00 3.000
6 Semen Portland Kg 1,400.00 336.000
7 Pasir M3 85,000.00 0.540
8 Batu pecah 1-2 cm (Kerikil) M3 500,000.00 0.810
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Membuat 1m3 Kolom Beton Bertulang (300 kg besi + bekisting) (P.BB. 18)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 7.050
2 Tukang Batu OH 61,665.00 0.275
3 Tukang Kayu OH 61,665.00 1.650
4 Tukang Besi OH 61,665.00 2.100
5 Kepala Tukang OH 61,665.00 0.403
6 Mandor OH 61,665.00 0.353
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.400
2 Paku 2" - 5" Kg 18,000.00 4.000
3 Minyak Bekisting Lt 7,000.00 2.000
4 Besi Beton Polos Kg 9,000.00 315.000

Pekerjaan Beton Bertulang 129


5 Kawat Ikat Beton (bendrat) Kg 9,500.00 4.500
6 Semen Portland Kg 1,400.00 336.000
7 Pasir M3 85,000.00 0.540
8 Batu pecah 1-2 cm (Kerikil) M3 500,000.00 0.810
9 Balok Kayu Kelas II M3 z 0.150
10 Triplek t = 9mm Lbr z 3.500
11 Cerucuk Ǿ 8 - 10cm / 4m Btg z 20.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 130


Membuat 1m3 Balok Beton Bertulang (200 kg besi + bekisting) (P.BB. 19)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 6.350
2 Tukang Batu OH 61,665.00 0.275
3 Tukang Kayu OH 61,665.00 1.650
4 Tukang Besi OH 61,665.00 1.400
5 Kepala Tukang OH 61,665.00 0.333
6 Mandor OH 61,665.00 0.318
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.320
2 Paku 2" - 5" Kg 18,000.00 3.200
3 Minyak Bekisting Lt 7,000.00 1.600
4 Besi Beton Polos Kg 9,000.00 210.000
5 Kawat Ikat Beton (bendrat) Kg 9,500.00 3.000
6 Semen Portland Kg 1,400.00 336.000
7 Pasir M3 85,000.00 0.540
8 Batu pecah 1-2 cm (Kerikil) M3 500,000.00 0.810
9 Balok Kayu Kelas II M3 z 0.140
10 Triplek t = 9mm Lbr z 2.800
11 Cerucuk Ǿ 8 - 10cm / 4m Btg z 16.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Membuat 1m3 Kolom Beton Bertulang (150 kg besi + bekisting) (P.BB. 20)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 5.300
2 Tukang Batu OH 61,665.00 0.275
3 Tukang Kayu OH 61,665.00 1.300
4 Tukang Besi OH 61,665.00 1.050
5 Kepala Tukang OH 61,665.00 0.265
6 Mandor OH 61,665.00 0.265
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.320

Pekerjaan Beton Bertulang 131


2 Paku 2" - 5" Kg 18,000.00 3.200
3 Minyak Bekisting Lt 7,000.00 1.600
4 Besi Beton Polos Kg 9,000.00 157.500
5 Kawat Ikat Beton (bendrat) Kg 9,500.00 2.250
6 Semen Portland Kg 1,400.00 336.000
7 Pasir M3 85,000.00 0.540
8 Batu pecah 1-2 cm (Kerikil) M3 500,000.00 0.810
9 Balok Kayu Kelas II M3 z 0.120
10 Triplek t = 9mm Lbr z 2.800
11 Cerucuk Ǿ 8 - 10cm / 4m Btg z 32.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 132


Membuat 1m3 Dinding Beton Bertulang (150 kg besi + bekisting) (P.BB. 21)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 5.300
2 Tukang Batu OH 61,665.00 0.275
3 Tukang Kayu OH 61,665.00 1.300
4 Tukang Besi OH 61,665.00 1.050
5 Kepala Tukang OH 61,665.00 0.262
6 Mandor OH 61,665.00 0.265
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.240
2 Paku 2" - 5" Kg 18,000.00 3.200
3 Minyak Bekisting Lt 7,000.00 1.600
4 Besi Beton Polos Kg 9,000.00 157.500
5 Kawat Ikat Beton (bendrat) Kg 9,500.00 2.250
6 Semen Portland Kg 1,400.00 336.000
7 Pasir M3 85,000.00 0.540
8 Batu pecah 1-2 cm (Kerikil) M3 500,000.00 0.810
9 Balok Kayu Kelas II M3 z 0.160
10 Triplek t = 9mm Lbr z 2.800
11 Cerucuk Ǿ 8 - 10cm / 4m Btg z 24.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Membuat 1m3 Dinding Beton Bertulang (200 kg besi + bekisting) (P.BB. 22)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 5.650
2 Tukang Batu OH 61,665.00 0.275
3 Tukang Kayu OH 61,665.00 1.560
4 Tukang Besi OH 61,665.00 1.400
5 Kepala Tukang OH 61,665.00 0.323
6 Mandor OH 61,665.00 0.283
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.250

Pekerjaan Beton Bertulang 133


2 Paku 2" - 5" Kg 18,000.00 3.000
3 Minyak Bekisting Lt 7,000.00 1.200
4 Besi Beton Polos Kg 9,000.00 210.000
5 Kawat Ikat Beton (bendrat) Kg 9,500.00 3.000
6 Semen Portland Kg 1,400.00 336.000
7 Pasir M3 85,000.00 0.540
8 Batu pecah 1-2 cm (Kerikil) M3 500,000.00 0.810
9 Balok Kayu Kelas II M3 z 0.105
10 Triplek t = 9mm Lbr z 2.500
11 Cerucuk Ǿ 8 - 10cm / 4m Btg z 14.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 134


Membuat 1m' Kolom Praktis Beton Bertulang (11 x 11) cm (P.BB. 23)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.180
2 Tukang Batu OH 61,665.00 0.020
3 Tukang Kayu OH 61,665.00 0.020
4 Tukang Besi OH 61,665.00 0.020
5 Kepala Tukang OH 61,665.00 0.006
6 Mandor OH 61,665.00 0.009
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.002
2 Paku 2" - 5" Kg 18,000.00 0.010
3 Minyak Bekisting Lt 7,000.00 0.000
4 Besi Beton Polos Kg 9,000.00 3.000
5 Kawat Ikat Beton (bendrat) Kg 9,500.00 0.450
6 Semen Portland Kg 1,400.00 4.000
7 Pasir M3 85,000.00 0.006
8 Batu pecah 1-2 cm (Kerikil) M3 500,000.00 0.009
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Membuat 1m' Ring Balok Beton Bertulang (10 x 15) cm (P.BB. 24)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.297
2 Tukang Batu OH 61,665.00 0.033
3 Tukang Kayu OH 61,665.00 0.033
4 Tukang Besi OH 61,665.00 0.033
5 Kepala Tukang OH 61,665.00 0.010
6 Mandor OH 61,665.00 0.015
Jumlah
B BAHAN
1 Kayu Kelas III M3 1,500,000.00 0.003
2 Paku 2" - 5" Kg 18,000.00 0.020
3 Minyak Bekisting Lt 7,000.00 0.000
4 Besi Beton Polos Kg 9,000.00 3.600
5 Kawat Ikat Beton (bendrat) Kg 9,500.00 0.050

Pekerjaan Beton Bertulang 135


6 Semen Portland Kg 1,400.00 5.500
7 Pasir M3 85,000.00 0.009
8 Batu pecah 1-2 cm (Kerikil) M3 500,000.00 0.015
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Pekerjaan Beton Bertulang 136


Membuat 1m3 Beton Mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78 (P.BB. 25)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.650
2 Tukang Batu OH 61,665.00 0.275
3 Kepala Tukang OH 61,665.00 0.028
4 Mandor OH 61,665.00 0.083
Jumlah
B BAHAN
1 Semen Portland Kg 1,400.00 276.000
2 Pasir Kg 60.71 828.000
3 Batu pecah 1-2 cm (Kerikil) Kg 370.37 1,012.000
4 Air Liter 0.00 0.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

Pekerjaan Beton Bertulang 137


)

, w/c = 0,87 (P.BB. 01)


BIAYA
SATUAN
( Rp. )
6

30,832.50
9,249.75
924.98
3,083.25
44,090.48

280,000.00
51,607.14
370,370.37
0.00
701,977.51
746,067.99
746,067.99

87 (P.BB. 02)
BIAYA
SATUAN
( Rp. )
6

101,747.25
16,957.88
1,726.62
5,118.20
125,549.94

345,800.00
52,760.71
370,000.00
0.00
768,560.71
894,110.65
894,110.65

Pekerjaan Beton Bertulang 138


,66 (P.BB. 03)
BIAYA
SATUAN
( Rp. )
6

101,747.25
16,957.88
1,726.62
5,118.20
125,549.94

456,400.00
46,142.86
381,111.11
0.00
883,653.97
1,009,203.91
1,009,203.91

Pekerjaan Beton Bertulang 139


BIAYA
SATUAN
( Rp. )
6

101,747.25
16,957.88
1,726.62
5,118.20
125,549.94
31,387.49

,58 (P.BB. 04)


BIAYA
SATUAN
( Rp. )
6

101,747.25
16,957.88
1,726.62
5,118.20
75,329.96

350,000.00
54,642.86
222,222.22
0.00
626,865.08
702,195.04
702,195.04

Pekerjaan Beton Bertulang 140


BIAYA
SATUAN
( Rp. )
6

101,747.25
16,957.88
1,726.62
5,118.20
125,549.94
31,387.49

Pekerjaan Beton Bertulang 141


,56 (P.BB. 05)
BIAYA
SATUAN
( Rp. )
6

101,747.25
16,957.88
1,726.62
5,118.20
125,549.94

537,600.00
42,014.29
384,814.81
0.00
964,429.10
1,089,979.04
1,089,979.04

,52 (P.BB. 06)


BIAYA
SATUAN
( Rp. )
6

101,747.25
16,957.88
1,726.62
5,118.20
125,549.94

578,200.00
41,346.43
378,148.15
0.00
997,694.58
1,123,244.52
1,123,244.52

Pekerjaan Beton Bertulang 142


BIAYA
SATUAN
( Rp. )
6

101,747.25
16,957.88
1,726.62
5,118.20
125,549.94
31,387.49

Pekerjaan Beton Bertulang 143


BIAYA
SATUAN
( Rp. )
6

3,699.90
3,699.90
369.99
185.00
7,954.79

81,000.00
475.00
81,475.00
89,429.79
89,429.79
8,942.98

BIAYA
SATUAN
( Rp. )
6

1,541.63
1,541.63
1,541.63
61.67
4,686.54

0.00
475.00
475.00
5,161.54
5,161.54
516.15

BIAYA
SATUAN

Pekerjaan Beton Bertulang 144


( Rp. )
6

30,832.50
12,333.00
1,233.30
1,233.30
45,632.10

30,000.00
5,400.00
700.00
36,100.00
81,732.10
32,692.84

Pekerjaan Beton Bertulang 145


BIAYA
SATUAN
( Rp. )
6

32,065.80
16,032.90
1,603.29
1,603.29
51,305.28
25,652.64

46,500.00
5,400.00
0.00
51,900.00
77,552.64
77,552.64

BIAYA
SATUAN
( Rp. )
6

32,065.80
16,032.90
1,603.29
1,603.29
51,305.28

67,500.00
5,400.00
0.00
72,900.00
124,205.28
12,420.53

BIAYA

Pekerjaan Beton Bertulang 146


SATUAN
( Rp. )
6

40,698.90
20,349.45
2,034.95
2,034.95
65,118.24

60,000.00
7,200.00
1,400.00
#VALUE!
#VALUE!
#VALUE!

Pekerjaan Beton Bertulang 147


BIAYA
SATUAN
( Rp. )
6

40,698.90
20,349.45
2,034.95
2,034.95
65,118.24

82,500.00
7,200.00
0.00
33,000.00
20,000.00
142,700.00
207,818.24
20,781.82

BIAYA
SATUAN
( Rp. )
6

40,698.90
20,349.45
2,034.95
2,034.95
65,118.24

60,000.00
7,200.00
1,400.00
#VALUE!
#VALUE!
#VALUE!

Pekerjaan Beton Bertulang 148


BIAYA
SATUAN
( Rp. )
6

40,698.90
20,349.45
2,034.95
2,034.95
65,118.24

7,200.00
0.00
87,000.00
33,000.00
20,000.00
147,200.00
212,318.24
42,463.65

Pekerjaan Beton Bertulang 149


BIAYA
SATUAN
( Rp. )
6

40,698.90
20,349.45
2,034.95
2,034.95
65,118.24

60,000.00
7,200.00
1,400.00
#VALUE!
#VALUE!
#VALUE!

BIAYA
SATUAN
( Rp. )
6

40,698.90
20,349.45
2,034.95
2,034.95
65,118.24

7,200.00
0.00
82,500.00
33,000.00
60,000.00
182,700.00
247,818.24
247,818.24

Pekerjaan Beton Bertulang 150


BIAYA
SATUAN
( Rp. )
6

40,698.90
20,349.45
2,034.95
2,034.95
65,118.24

45,000.00
7,200.00
1,050.00
#VALUE!
#VALUE!
#VALUE!

Pekerjaan Beton Bertulang 151


BIAYA
SATUAN
( Rp. )
6

9,249.75
3,083.25
308.33
493.32
13,134.65

39,600.00
10,800.00

BIAYA
SATUAN
( Rp. )
6

326,824.50
16,957.88
80,164.50
64,748.25
16,156.23
16,341.23
521,192.58

300,000.00
27,000.00
2,800.00
1,417,500.00
21,375.00
470,400.00
45,900.00
405,000.00
2,689,975.00
3,211,167.58
3,211,167.58

Pekerjaan Beton Bertulang 152


BIAYA
SATUAN
( Rp. )
6

348,407.25
16,957.88
96,197.40
86,331.00
19,917.80
17,451.20
585,262.52

405,000.00
36,000.00
4,200.00
1,890,000.00
28,500.00
470,400.00
45,900.00
405,000.00
3,285,000.00
3,870,262.52
3,870,262.52

BIAYA
SATUAN
( Rp. )
6

434,738.25
16,957.88
101,747.25
129,496.50
24,851.00
21,767.75
729,558.62

600,000.00
72,000.00
14,000.00
2,835,000.00

Pekerjaan Beton Bertulang 153


42,750.00
470,400.00
45,900.00
405,000.00
#VALUE!
#VALUE!
#VALUE!

Pekerjaan Beton Bertulang 154


BIAYA
SATUAN
( Rp. )
6

391,572.75
16,957.88
101,747.25
86,331.00
20,534.45
19,609.47
636,752.79

480,000.00
57,600.00
11,200.00
1,890,000.00
28,500.00
470,400.00
45,900.00
405,000.00
#VALUE!
#VALUE!
#VALUE!

BIAYA
SATUAN
( Rp. )
6

326,824.50
16,957.88
80,164.50
64,748.25
16,341.23
16,341.23
521,377.58

480,000.00

Pekerjaan Beton Bertulang 155


57,600.00
11,200.00
1,417,500.00
21,375.00
470,400.00
45,900.00
405,000.00
#VALUE!
#VALUE!
#VALUE!

Pekerjaan Beton Bertulang 156


BIAYA
SATUAN
( Rp. )
6

326,824.50
16,957.88
80,164.50
64,748.25
16,156.23
16,341.23
521,192.58

360,000.00
57,600.00
11,200.00
1,417,500.00
21,375.00
470,400.00
45,900.00
405,000.00
#VALUE!
#VALUE!
#VALUE!

BIAYA
SATUAN
( Rp. )
6

348,407.25
16,957.88
96,197.40
86,331.00
19,917.80
17,451.20
585,262.52

375,000.00

Pekerjaan Beton Bertulang 157


54,000.00
8,400.00
1,890,000.00
28,500.00
470,400.00
45,900.00
405,000.00
#VALUE!
#VALUE!
#VALUE!

Pekerjaan Beton Bertulang 158


BIAYA
SATUAN
( Rp. )
6

11,099.70
1,233.30
1,233.30
1,233.30
369.99
554.99
15,724.58

3,000.00
180.00
0.00
27,000.00
4,275.00
5,600.00
510.00
4,500.00
45,065.00
60,789.58
60,789.58

BIAYA
SATUAN
( Rp. )
6

18,314.51
2,034.95
2,034.95
2,034.95
616.65
924.98
25,960.97

4,500.00
360.00
0.00
32,400.00
475.00

Pekerjaan Beton Bertulang 159


7,700.00
765.00
7,500.00
53,700.00
79,660.97
79,660.97

Pekerjaan Beton Bertulang 160


78 (P.BB. 25)
BIAYA
SATUAN
( Rp. )
6

101,747.25
16,957.88
1,726.62
5,118.20
125,549.94

386,400.00
50,271.43
374,814.81
0.00
811,486.24
937,036.18
937,036.18

Pekerjaan Beton Bertulang 161


E. PEKERJAAN DINDING (P.Dnd.)

1m2 Pasang Batako uk. 15/30/7(P.Dnd. 01)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.32
2 Tukang Batu OH 61,665.00 0.10
3 Kepala Tukang OH 61,665.00 0.01
4 Mandor OH 61,665.00 0.015
Jumlah
B BAHAN
1 Batako 15/30/7 (cetak mesin) Bh k 22.000
2 Semen Portland Kg 1,400.00 7.500
3 Pasir Beton / Pasang M3 85,000.00 0.027
Jumlah
C Jumlah A + B
D Harga Satuan 70%
Acuan : ABK Bangunan Gedung dan Perumahan - 6.20
1m2 Pasang Batako uk. 20/40/7(P.Dnd. 03)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.30
2 Tukang Batu OH 61,665.00 0.10
3 Kepala Tukang OH 61,665.00 0.01
4 Mandor OH 61,665.00 0.010
Jumlah 40%
B BAHAN
1 Batako 20/40/7 (cetak mesin) Bh 3,000.00 12
2 Semen Portland Kg 1,400.00 3.500
3 Pasir Beton / Pasang M3 85,000.00 0.020
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.20

Pekerjaan Dinding 162


BIAYA
SATUAN
( Rp. )
6

19,732.80
6,166.50
616.65
924.98
27,440.93

10,500.00
2,295.00

BIAYA
SATUAN
( Rp. )
6

18,499.50
6,166.50
308.33
616.65
10,236.39

36,000.00
4,900.00
1,700.00
42,600.00
52,836.39
52,836.39

Pekerjaan Dinding 163


G. PEKERJAAN KAYU (P.K.)

1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan
Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 9/9 (P.K. 01)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 24.000
2 Pekerja OH 61,665.00 8.000
3 Kepala Tukang OH 61,665.00 2.400
4 Mandor OH 61,665.00 0.400
Jumlah
B BAHAN
1 Kayu Belian (Tidak Ketam uk. 9/9) M3 z 1.100
2 Paku beton Kg 20,000.00 3.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.3

1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan
Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 10/10 (P.K. 02)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 24.000
2 Pekerja OH 61,665.00 8.000
3 Kepala Tukang OH 61,665.00 2.400
4 Mandor OH 61,665.00 0.400
Jumlah
B BAHAN
1 Kayu Belian (Tidak Ketam uk 10/10) M3 z 1.100
2 Paku beton Kg 20,000.00 3.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.3

Pekerjaan Kayu 164


1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau,
Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian
Uk. 12/12 - 15/15 (P.K. 03)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 24.000
2 Pekerja OH 61,665.00 8.000
3 Kepala Tukang OH 61,665.00 2.400
4 Mandor OH 61,665.00 0.400
Jumlah
B BAHAN
1 Kayu Belian (Tidak Ketam uk. 12/12 - 15/15) M3 z 1.100
2 Paku beton Kg 20,000.00 3.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.3

Pekerjaan Kayu 165


1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau,
Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian
Uk. 18/18 - 20/20 (P.K. 04)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 24.000
2 Pekerja OH 61,665.00 8.000
3 Kepala Tukang OH 61,665.00 2.400
4 Mandor OH 61,665.00 0.400
Jumlah
B BAHAN
1 Kayu Belian (Tidak Ketam uk. 18/18 - 20/20) M3 8,107,850.00 1.100
2 Paku beton Kg 20,000.00 3.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.3

1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 7/7 (P.K. 05)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 36.000
2 Pekerja OH 61,665.00 12.000
3 Kepala Tukang OH 61,665.00 3.600
4 Mandor OH 61,665.00 0.600
Jumlah
B BAHAN
1 Kayu Belian (Ketam uk. 7/7) M3 z 1.100
2 Paku beton Kg 20,000.00 6.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27

1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 8/8 (P.K. 06)
HARGA
No. URAIAN PEKERJAAN SATUAN KUANTITAS

Pekerjaan Kayu 166


No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 36.000
2 Pekerja OH 61,665.00 12.000
3 Kepala Tukang OH 61,665.00 3.600
4 Mandor OH 61,665.00 0.600
Jumlah
B BAHAN
1 Kayu Belian (Ketam uk. 8/8) M3 z 1.100
2 Paku belian Kg 20,000.00 6.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27

Pekerjaan Kayu 167


1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 7/7 (P.K. 07)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 24.000
2 Pekerja OH 61,665.00 8.000
3 Kepala Tukang OH 61,665.00 2.400
4 Mandor OH 61,665.00 0.400
Jumlah
B BAHAN
1 Kayu Kelas I (Ketam Uk. 7/7) M3 z 1.100
2 Paku Kg 18,000.00 6.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27.a

1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 8/8 (P.K. 08)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 24.000
2 Pekerja OH 61,665.00 8.000
3 Kepala Tukang OH 61,665.00 2.400
4 Mandor OH 61,665.00 0.400
Jumlah
B BAHAN
1 Kayu Kelas I (Ketam Uk. 8/8) M3 z 1.100
2 Paku Kg 18,000.00 6.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27.a

1m1 Melancip Tiang / Batang (P.K. 09)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5

Pekerjaan Kayu 168


A TENAGA
1 Tukang Kayu OH 61,665.00 0.250
2 Kepala Tukang OH 61,665.00 0.025
3 Pekerja OH 61,665.00 0.100
4 Mandor OH 61,665.00 0.005
Jumlah
B Jumlah A
C Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - E.1

Membuat Puting dan Lobang / Pasang (P.K. 10)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 0.600
2 Kepala Tukang OH 61,665.00 0.060
Jumlah
B Jumlah A
C Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - E.4

Pekerjaan Kayu 169


1 m1 Memancang Tiang ke Dalam Tanah (P.K. 11)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.800
2 Tukang kayu OH 61,665.00 0.040
3 Kepala Tukang OH 61,665.00 0.004
4 Mandor OH 61,665.00 0.043
Jumlah
B Jumlah A
C Harga Satuan
E Harga Upah 1/2 x Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - E.13

Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I (P.K. 12)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 7.000
2 Tukang Kayu OH 61,665.00 21.000
3 Kepala Tukang OH 61,665.00 2.100
4 Mandor OH 61,665.00 0.350
Jumlah
B BAHAN
1 Kayu Kelas 1 uk. 5/10 (Ketam - utk Kusen) M3 z 1.100
2 Paku 10 cm kg 20,000.00 1.250
3 Lem Kayu kg 15,000.00 1.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela Kayu Belian (P.K. 12.a)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA

Pekerjaan Kayu 170


1 Pekerja OH 61,665.00 7.000
2 Tukang Kayu OH 61,665.00 21.000
3 Kepala Tukang OH 61,665.00 2.100
4 Mandor OH 61,665.00 0.350
Jumlah
B BAHAN
1 Kayu Belian (Ketam) M3 z 1.100
2 Paku 10 cm kg 20,000.00 1.250
3 Lem Kayu kg 15,000.00 1.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Pekerjaan Kayu 171


Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas II (P.K. 13)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 6.000
2 Tukang Kayu OH 61,665.00 18.000
3 Kepala Tukang OH 61,665.00 1.800
4 Mandor OH 61,665.00 0.300
Jumlah
B BAHAN
1 Kayu Kelas II uk. 5/10 (Tidak Ketam) M3 1,500,000.00 1.200
2 Paku 10 cm kg 20,000.00 1.250
3 Lem Kayu kg 15,000.00 1.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas I (P.K. 14)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.000
2 Tukang Kayu OH 61,665.00 3.000
3 Kepala Tukang OH 61,665.00 0.300
4 Mandor OH 61,665.00 0.050
Jumlah
B BAHAN
1 Papan kayu klas I ketam M3 z 0.040
2 Lem Kayu kg 15,000.00 0.500
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas II (P.K. 15)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS

Pekerjaan Kayu 172


No. URAIAN PEKERJAAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.000
2 Tukang Kayu OH 61,665.00 1.000
3 Kepala Tukang OH 61,665.00 0.000
4 Mandor OH 61,665.00 0.000
Jumlah
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 1,500,000.00 0.025
2 Lem Kayu kg 15,000.00 0.500
Jumlah
C Jumlah A + B
D Harga Satuan 100%
Acuan : SNI DT 91-0011-2007

Pekerjaan Kayu 173


Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas I (P.K. 16)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.000
2 Tukang Kayu OH 61,665.00 3.000
3 Kepala Tukang OH 61,665.00 0.300
4 Mandor OH 61,665.00 0.050
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 z 0.064
2 Lem Kayu kg 15,000.00 0.500
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas II (P.K. 17)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 1.000
2 Tukang Kayu OH 61,665.00 3.000
3 Kepala Tukang OH 61,665.00 0.300
4 Mandor OH 61,665.00 0.050
Jumlah
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 1,500,000.00 0.024
2 Lem Kayu kg 15,000.00 0.500
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Membuat 1m2 Daun Pintu Kayu Lapis (Plywood) Rangkap, Rangka Tertutup Kayu Kelas II
(Lebar sampai 90 cm) (P.K. 18)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS

Pekerjaan Kayu 174


No. URAIAN PEKERJAAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.700
2 Tukang Kayu OH 61,665.00 2.100
3 Kepala Tukang OH 61,665.00 0.210
4 Mandor OH 61,665.00 0.035
Jumlah
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 1,500,000.00 0.025
2 Paku /2" -1"
1
Kg 18,000.00 0.030
3 Lem Kayu Kg 15,000.00 0.500
4 Plywood 4' x 8' x 4mm Lbr z 1.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Pekerjaan Kayu 175


Membuat 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I (P.K. 19)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.800
2 Tukang Kayu OH 61,665.00 2.400
3 Kepala Tukang OH 61,665.00 0.240
4 Mandor OH 61,665.00 0.040
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 z 0.0256
2 Paku 1/2" -1" Kg 18,000.00 0.030
3 Lem Kayu Kg 15,000.00 0.500
4 Plywood 4' x 8' x 4mm Lbr z 1.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Membuat 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas II (P.K. 20)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.800
2 Tukang Kayu OH 61,665.00 2.400
3 Kepala Tukang OH 61,665.00 0.240
4 Mandor OH 61,665.00 0.040
Jumlah
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 1,500,000.00 0.0256
2 Paku 1/2" -1" Kg 18,000.00 0.030
3 Lem Kayu Kg 15,000.00 0.500
4 Plywood 4' x 8' x 4mm Lbr z 1.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Pekerjaan Kayu 176


Membuat 1m2 Jalusi Kusen, Kayu Kelas I (P.K. 21)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.670
2 Tukang Kayu OH 61,665.00 2.000
3 Kepala Tukang OH 61,665.00 0.200
4 Mandor OH 61,665.00 0.335
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 z 0.060
2 Paku 1/2" -1" Kg 18,000.00 0.150
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Pekerjaan Kayu 177


Membuat 1m2 Jalusi Kusen, Kayu Kelas II (P.K. 22)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.670
2 Tukang Kayu OH 61,665.00 2.000
3 Kepala Tukang OH 61,665.00 0.200
4 Mandor OH 61,665.00 0.335
Jumlah
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 1,500,000.00 0.060
2 Paku 1/2" -1" Kg 18,000.00 0.150
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

1m2 Pemasangan Ventilasi Kaca


Setiap luas 1 m2 bidang daun ventilasi, luas kacanya adalah 0.60 m 2 (P.K. 23)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 0.650
2 Pekerja OH 61,665.00 0.100
3 Kepala Tukang OH 61,665.00 0.080
4 Mandor OH 61,665.00 0.014
Jumlah
B BAHAN
1 List Kayu M' 2,500.00 8.000
2 Kaca Polos tebal 5 mm 2 125,000.00 0.600
M
3 Paku triplek Kg 18,000.00 0.050
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.37.c

Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas I Bentang 6 m (P.K. 24)
HARGA
No. URAIAN PEKERJAAN SATUAN KUANTITAS

Pekerjaan Kayu 178


No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 4.000
2 Tukang Kayu OH 61,665.00 12.000
3 Kepala Tukang OH 61,665.00 1.200
4 Mandor OH 61,665.00 0.200
Jumlah
B BAHAN
1 Balok Kayu Kelas I (Tidak Ketam) M3 z 1.100
2 Besi Strip Kg z 15.000
3 Paku 12 cm Kg 18,000.00 5.600
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Pekerjaan Kayu 179


Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas II Bentang 6 m (P.K. 25)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 4.000
2 Tukang Kayu OH 61,665.00 12.000
3 Kepala Tukang OH 61,665.00 1.200
4 Mandor OH 61,665.00 0.200
Jumlah
B BAHAN
1 Balok Kayu Kelas II (Tidak Ketam) M3 z 1.100
2 Besi Strip Kg z 15.000
3 Paku 12 cm Kg 18,000.00 5.600
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Memasang 1m3 Konstruksi Kuda-kuda Expose, Kayu Kelas I (P.K. 26)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 6.700
2 Tukang Kayu OH 61,665.00 20.100
3 Kepala Tukang OH 61,665.00 2.010
4 Mandor OH 61,665.00 0.335
Jumlah
B BAHAN
1 Balok Kayu Kelas I (Tidak Ketam) M3 z 1.200
2 Besi Strip Btg z 15.000
3 Paku 12 cm Kg 18,000.00 5.600
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Memasang 1m3 Konstruksi Gordeng, Kayu Kelas II (P.K. 27)


HARGA
No. URAIAN PEKERJAAN SATUAN KUANTITAS

Pekerjaan Kayu 180


No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 2.400
2 Tukang Kayu OH 61,665.00 7.200
3 Kepala Tukang OH 61,665.00 0.720
4 Mandor OH 61,665.00 0.120
Jumlah
B BAHAN
1 Balok Kayu Kelas II (Tidak Ketam) M3 z 1.100
2 Besi Strip Btg z 15.000
3 Paku 12 cm Kg 18,000.00 3.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Pekerjaan Kayu 181


Memasang 1m2 Rangka Atap Genteng Keramik, Kayu Kelas II (P.K. 28)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.100
2 Tukang Kayu OH 61,665.00 0.100
3 Kepala Tukang OH 61,665.00 0.010
4 Mandor OH 61,665.00 0.005
Jumlah
B BAHAN
1 Kaso-kaso (5x7) cm M3 z 0.014
2 Reng M3 z 0.036
3 Paku 7 cm - 10 cm Kg 18,000.00 0.250
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Memasang 1m2 Rangka Atap Genteng Beton, Kayu Kelas II (P.K. 29)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.100
2 Tukang Kayu OH 61,665.00 0.100
3 Kepala Tukang OH 61,665.00 0.010
4 Mandor OH 61,665.00 0.005
Jumlah
B BAHAN
1 Kaso-kaso (5x7) cm M3 z 0.014
2 Reng M3 z 0.057
3 Paku 7 cm - 10 cm Kg 18,000.00 0.250
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Memasang 1m3 Konstruksi Gordeng, Kayu Kelas I (P.K. 30)


HARGA
No. URAIAN PEKERJAAN SATUAN KUANTITAS
Pekerjaan Kayu 182
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 2.400
2 Tukang Kayu OH 61,665.00 7.200
3 Kepala Tukang OH 61,665.00 0.720
4 Mandor OH 61,665.00 0.120
Jumlah
B BAHAN
1 Balok Kayu Kelas I (Tidak Ketam) M3 z 1.100
2 Besi Strip Btg z 15.000
3 Paku 12 cm Kg 18,000.00 3.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Pekerjaan Kayu 183


Memasang 1m3 Konstruksi Gordeng, Kayu Belian (P.K. 30.a)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 2.400
2 Tukang Kayu OH 61,665.00 7.200
3 Kepala Tukang OH 61,665.00 0.720
4 Mandor OH 61,665.00 0.120
Jumlah
B BAHAN
1 Balok Kayu Belian (Tidak Ketam) M3 z 1.100
2 Besi Strip Btg z 15.000
3 Paku 12 cm Kg 18,000.00 3.000
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Memasang 1m2 Rangka Atap Sirap, Kayu Kelas II (P.K. 31)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 0.120
2 Pekerja OH 61,665.00 0.120
3 Kepala Tukang OH 61,665.00 0.012
4 Mandor OH 61,665.00 0.006
Jumlah
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 z 0.165
2 Paku 5 cm - 10 cm Kg 18,000.00 0.200
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

1m2 Pemasangan Rangka Atap Seng (P.K. 32)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS

Pekerjaan Kayu 184


No. URAIAN PEKERJAAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 0.100
2 Pekerja OH 61,665.00 0.150
3 Kepala Tukang OH 61,665.00 0.010
4 Mandor OH 61,665.00 0.0080
Jumlah
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 1,500,000.00 0.0111
2 Paku Kg 18,000.00 0.075
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.19

Pekerjaan Kayu 185


1m2 Pasang Kasau + Reng Atap Genteng Metal Kayu Kelas II (P.K. 33)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.100
2 Tukang Kayu OH 61,665.00 0.100
3 Kepala Tukang OH 61,665.00 0.010
4 Mandor OH 61,665.00 0.005
Jumlah
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 1,500,000.00 0.014
2 Paku Kg 18,000.00 0.150
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.35

Memasang 1m2 Rangka Langit-langit (50 x 100) cm, Kayu Kelas II atau III (P.K. 34)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.150
2 Tukang Kayu OH 61,665.00 0.300
3 Kepala Tukang OH 61,665.00 0.030
4 Mandor OH 61,665.00 0.075
Jumlah
B BAHAN
1 Kaso-kaso (5x7) cm M3 z 0.0154
2 Paku 7 cm - 10 cm Kg 18,000.00 0.200
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Memasang 1m2 Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III (P.K. 35)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )

Pekerjaan Kayu 186


1 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.200
2 Tukang Kayu OH 61,665.00 0.300
3 Kepala Tukang OH 61,665.00 0.030
4 Mandor OH 61,665.00 0.010
Jumlah
B BAHAN
1 Kaso-kaso (5x7) cm M3 z 0.0163
2 Paku 7 cm - 10 cm Kg 18,000.00 0.250
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Pekerjaan Kayu 187


1m2 Pasang Rangka Langit-langit (30 x 60)cm Kayu Kelas II (P.K. 36)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.200
2 Tukang Kayu OH 61,665.00 0.300
3 Kepala Tukang OH 61,665.00 0.030
4 Mandor OH 61,665.00 0.010
Jumlah
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 z 0.023
2 Paku Kg 18,000.00 0.150
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.41

1m2 Pasang Rangka Langit-langit (30 x 30)cm Kayu Kelas II (P.K. 37)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.100
2 Tukang Kayu OH 61,665.00 0.150
3 Kepala Tukang OH 61,665.00 0.000
4 Mandor OH 61,665.00 0.0125
Jumlah
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 1,500,000.00 0.015
2 Paku Kg 18,000.00 0.150
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.44

Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas I (P.K. 38)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )

Pekerjaan Kayu 188


1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.100
2 Tukang Kayu OH 61,665.00 0.200
3 Kepala Tukang OH 61,665.00 0.020
4 Mandor OH 61,665.00 0.005
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 z 0.0108
2 Paku Kg 18,000.00 0.100
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Pekerjaan Kayu 189


Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas II (P.K. 39)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.100
2 Tukang Kayu OH 61,665.00 0.200
3 Kepala Tukang OH 61,665.00 0.020
4 Mandor OH 61,665.00 0.005
Jumlah
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 1,500,000.00 0.0108
2 Paku Kg 18,000.00 0.100
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

1m1 Pasang Lisplank Ukuran 2 x (3 x 20cm) Kayu Kelas I (P.K. 40)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.150
2 Tukang Kayu OH 61,665.00 0.250
3 Kepala Tukang OH 61,665.00 0.025
4 Mandor OH 61,665.00 0.075
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 z 0.0145
2 Paku Kg 18,000.00 0.060
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.51

1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Belian (P.K. 41)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )

Pekerjaan Kayu 190


1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.100
2 Tukang Kayu OH 61,665.00 0.100
3 Kepala Tukang OH 61,665.00 0.010
4 Mandor OH 61,665.00 0.050
Jumlah
B BAHAN
1 Papan Kayu Belian (Ketam) M3 z 0.0088
2 Paku Beton Kg 20,000.00 0.060
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.53

Pekerjaan Kayu 191


1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas I (P.K. 42)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.100
2 Tukang Kayu OH 61,665.00 0.100
3 Kepala Tukang OH 61,665.00 0.010
4 Mandor OH 61,665.00 0.050
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 z 0.0088
2 Paku Kg 18,000.00 0.060
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.53

1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas II (P.K. 43)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.100
2 Tukang Kayu OH 61,665.00 0.100
3 Kepala Tukang OH 61,665.00 0.010
4 Mandor OH 61,665.00 0.050
Jumlah 0.100
B BAHAN
1 Papan Kayu Kelas II (Ketam) M3 1,500,000.00 0.0088
2 Paku Kg 18,000.00 0.060
Jumlah 70%
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.53

1m2 Pasang Rangka Dinding Pemisah Kayu Kelas I (P.K. 44)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )

Pekerjaan Kayu 192


1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.150
2 Tukang Kayu OH 61,665.00 0.450
3 Kepala Tukang OH 61,665.00 0.045
4 Mandor OH 61,665.00 0.075
Jumlah
B BAHAN
1 Balok Kayu Kelas I (Tidak Ketam) M3 z 0.0195
2 Papan Kayu Kelas I (Tidak Ketam) 3 z 0.007
M
3 Paku Kg 18,000.00 0.100
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.54

Pekerjaan Kayu 193


Memasang 1m2 Rangka Dinding Pemisah (60x120) cm Kayu Kelas II (P.K. 45)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.150
2 Tukang Kayu OH 61,665.00 0.450
3 Kepala Tukang OH 61,665.00 0.045
4 Mandor OH 61,665.00 0.075
Jumlah
B BAHAN
1 Balok Kayu Kelas II (Tidak Ketam) M3 z 0.0195
2 Paku 5 cm dan 7 cm Kg 18,000.00 0.100
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Memasang 1m2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas II (P.K. 46)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.200
2 Tukang Kayu OH 61,665.00 0.600
3 Kepala Tukang OH 61,665.00 0.060
4 Mandor OH 61,665.00 0.010
Jumlah
B BAHAN
1 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M3 z 0.0280
2 Paku Kg 18,000.00 0.150
3 Plywood 4' x 8' x 4mm Lbr z 0.860
4 Lem Kayu Kg 15,000.00 0.560
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Memasang 1m2 Dinding Lambriziring dari Papan Kayu Kelas I (P.K. 47)
HARGA

Pekerjaan Kayu 194


No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.600
2 Tukang Kayu OH 61,665.00 1.800
3 Kepala Tukang OH 61,665.00 0.180
4 Mandor OH 61,665.00 0.030
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 z 0.007
2 Paku Kg 18,000.00 0.100
3 Sekrup Kg 117,659.85 0.150
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Pekerjaan Kayu 195


Memasang 1m2 Dinding Lambriziring dari Papan Kayu Belian (P.K. 47.a)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.600
2 Tukang Kayu OH 61,665.00 1.800
3 Kepala Tukang OH 61,665.00 0.180
4 Mandor OH 61,665.00 0.030
Jumlah
B BAHAN
1 Papan Kayu Belian (Ketam) M3 z 0.007
2 Paku Beton Kg 20,000.00 0.100
3 Sekrup Kg 117,659.85 0.150
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

Memasang 1m2 Dinding Lambriziring dari Plywood ukuran (120 x 240) cm (P.K. 48)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.025
2 Tukang Kayu OH 61,665.00 0.075
3 Kepala Tukang OH 61,665.00 0.008
4 Mandor OH 61,665.00 0.001
Jumlah
B BAHAN
1 Plywood 4' x 8' x 4mm Lbr z 0.400
2 Paku 1/2 " - 1" Kg 18,000.00 0.050
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0011-2007

1m1 Pasang List Plafond, Kayu Profil (P.K. 49)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS

Pekerjaan Kayu 196


( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.021
2 Tukang Kayu OH 61,665.00 0.021
3 Kepala Tukang OH 61,665.00 0.002
4 Mandor OH 61,665.00 0.001
Jumlah
B BAHAN
1 Kayu Profil M1 1.050
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.60

Pekerjaan Kayu 197


1m2 Pemasangan Lantai Papan Kayu Belian (P.K. 50)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 1.800
2 Pekerja OH 61,665.00 0.600
3 Kepala Tukang OH 61,665.00 0.180
4 Mandor OH 61,665.00 0.030
Jumlah
B BAHAN
1 Papan Kayu Belian (Ketam) M3 z 0.0240
2 Paku Beton Kg 20,000.00 0.200
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.38

1m2 Pemasangan Lantai Papan Kayu Kelas I (P.K. 51)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 61,665.00 1.800
2 Pekerja OH 61,665.00 0.600
3 Kepala Tukang OH 61,665.00 0.180
4 Mandor OH 61,665.00 0.030
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 z 0.0240
2 Paku Kg 18,000.00 0.200
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.38

Pekerjaan Kayu 198


arau, Topangan
9/9 (P.K. 01)
BIAYA
SATUAN
( Rp. )
6

1,479,960.00
493,320.00
147,996.00
24,666.00
2,145,942.00

60,000.00

arau, Topangan
10/10 (P.K. 02)
BIAYA
SATUAN
( Rp. )
6

1,479,960.00
493,320.00
147,996.00
24,666.00
2,145,942.00

60,000.00

Pekerjaan Kayu 199


BIAYA
SATUAN
( Rp. )
6

1,479,960.00
493,320.00
147,996.00
24,666.00
2,145,942.00

60,000.00

Pekerjaan Kayu 200


BIAYA
SATUAN
( Rp. )
6

1,479,960.00
493,320.00
147,996.00
24,666.00
2,145,942.00

8,918,635.00
60,000.00
8,978,635.00
11,124,577.00
11,124,577.00

BIAYA
SATUAN
( Rp. )
6

2,219,940.00
739,980.00
221,994.00
36,999.00
3,218,913.00

120,000.00

BIAYA

Pekerjaan Kayu 201


SATUAN
( Rp. )
6

2,219,940.00
739,980.00
221,994.00
36,999.00
3,218,913.00

120,000.00

Pekerjaan Kayu 202


BIAYA
SATUAN
( Rp. )
6

1,479,960.00
493,320.00
147,996.00
24,666.00
2,145,942.00

108,000.00

BIAYA
SATUAN
( Rp. )
6

1,479,960.00
493,320.00
147,996.00
24,666.00
2,145,942.00

108,000.00

BIAYA
SATUAN
( Rp. )
6

Pekerjaan Kayu 203


15,416.25
1,541.63
6,166.50
308.33
23,432.70
23,432.70
23,432.70

BIAYA
SATUAN
( Rp. )
6

36,999.00
3,699.90
40,698.90
40,698.90
40,698.90

Pekerjaan Kayu 204


BIAYA
SATUAN
( Rp. )
6

110,997.00
2,466.60
246.66
2,651.60
116,361.86
116,361.86
116,361.86
58,180.93

.K. 12)
BIAYA
SATUAN
( Rp. )
6

431,655.00
1,294,965.00
129,496.50
21,582.75
1,877,699.25

25,000.00
15,000.00

K. 12.a)
BIAYA
SATUAN
( Rp. )
6

Pekerjaan Kayu 205


431,655.00
1,294,965.00
129,496.50
21,582.75
1,877,699.25

25,000.00
15,000.00

Pekerjaan Kayu 206


P.K. 13)
BIAYA
SATUAN
( Rp. )
6

369,990.00
1,109,970.00
110,997.00
18,499.50
1,609,456.50

1,800,000.00
25,000.00
15,000.00
1,840,000.00
3,449,456.50
3,449,456.50

BIAYA
SATUAN
( Rp. )
6

61,665.00
184,995.00
18,499.50
3,083.25
268,242.75

7,500.00

BIAYA
SATUAN

Pekerjaan Kayu 207


( Rp. )
6

61,665.00
61,665.00
0.00
0.00
123,330.00

37,500.00
7,500.00
45,000.00
168,330.00
168,330.00

Pekerjaan Kayu 208


BIAYA
SATUAN
( Rp. )
6

61,665.00
184,995.00
18,499.50
3,083.25
268,242.75

7,500.00

BIAYA
SATUAN
( Rp. )
6

61,665.00
184,995.00
18,499.50
3,083.25
268,242.75

36,000.00
7,500.00
43,500.00
311,742.75
311,742.75

yu Kelas II

BIAYA
SATUAN

Pekerjaan Kayu 209


( Rp. )
6

43,165.50
129,496.50
12,949.65
2,158.28
187,769.93

37,500.00
540.00
7,500.00

Pekerjaan Kayu 210


BIAYA
SATUAN
( Rp. )
6

49,332.00
147,996.00
14,799.60
2,466.60
214,594.20

540.00
7,500.00

BIAYA
SATUAN
( Rp. )
6

49,332.00
147,996.00
14,799.60
2,466.60
214,594.20

38,400.00
540.00
7,500.00

Pekerjaan Kayu 211


BIAYA
SATUAN
( Rp. )
6

41,315.55
123,330.00
12,333.00
20,657.78
197,636.33

2,700.00

Pekerjaan Kayu 212


BIAYA
SATUAN
( Rp. )
6

41,315.55
123,330.00
12,333.00
20,657.78
197,636.33

90,000.00
2,700.00
92,700.00
290,336.33
290,336.33

BIAYA
SATUAN
( Rp. )
6

40,082.25
6,166.50
4,933.20
863.31
52,045.26

20,000.00
75,000.00
900.00
95,900.00
147,945.26
147,945.26

m (P.K. 24)
BIAYA

Pekerjaan Kayu 213


SATUAN
( Rp. )
6

246,660.00
739,980.00
73,998.00
12,333.00
1,072,971.00

100,800.00

Pekerjaan Kayu 214


m (P.K. 25)
BIAYA
SATUAN
( Rp. )
6

246,660.00
739,980.00
73,998.00
12,333.00
1,072,971.00

100,800.00

BIAYA
SATUAN
( Rp. )
6

413,155.50
1,239,466.50
123,946.65
20,657.78
1,797,226.43

100,800.00

BIAYA

Pekerjaan Kayu 215


SATUAN
( Rp. )
6

147,996.00
443,988.00
44,398.80
7,399.80
643,782.60

54,000.00

Pekerjaan Kayu 216


BIAYA
SATUAN
( Rp. )
6

6,166.50
6,166.50
616.65
308.33
13,257.98

4,500.00

BIAYA
SATUAN
( Rp. )
6

6,166.50
6,166.50
616.65
308.33
13,257.98

4,500.00

BIAYA

Pekerjaan Kayu 217


SATUAN
( Rp. )
6

147,996.00
443,988.00
44,398.80
7,399.80
643,782.60

54,000.00

Pekerjaan Kayu 218


BIAYA
SATUAN
( Rp. )
6

147,996.00
443,988.00
44,398.80
7,399.80
643,782.60

54,000.00

BIAYA
SATUAN
( Rp. )
6

7,399.80
7,399.80
739.98
369.99
15,909.57

3,600.00

BIAYA
SATUAN

Pekerjaan Kayu 219


( Rp. )
6

6,166.50
9,249.75
616.65
493.32
16,526.22

16,666.67
1,350.00
18,016.67
34,542.89
34,542.89

Pekerjaan Kayu 220


BIAYA
SATUAN
( Rp. )
6

6,166.50
6,166.50
616.65
308.33
13,257.98

21,000.00
2,700.00
23,700.00
36,957.98
36,957.98

BIAYA
SATUAN
( Rp. )
6

9,249.75
18,499.50
1,849.95
4,624.88
34,224.08

3,600.00

BIAYA
SATUAN
( Rp. )

Pekerjaan Kayu 221


6

12,333.00
18,499.50
1,849.95
616.65
33,299.10

4,500.00

Pekerjaan Kayu 222


BIAYA
SATUAN
( Rp. )
6

12,333.00
18,499.50
1,849.95
616.65
33,299.10

2,700.00

BIAYA
SATUAN
( Rp. )
6

6,166.50
9,249.75
0.00
770.81
16,187.06

22,500.00
2,700.00
25,200.00
41,387.06
41,387.06

BIAYA
SATUAN
( Rp. )

Pekerjaan Kayu 223


6

6,166.50
12,333.00
1,233.30
308.33
20,041.13

1,800.00

Pekerjaan Kayu 224


BIAYA
SATUAN
( Rp. )
6

6,166.50
12,333.00
1,233.30
308.33
20,041.13

16,200.00
1,800.00
18,000.00
38,041.13
38,041.13

BIAYA
SATUAN
( Rp. )
6

9,249.75
15,416.25
1,541.63
4,624.88
30,832.50

1,080.00

BIAYA
SATUAN
( Rp. )

Pekerjaan Kayu 225


6

6,166.50
6,166.50
616.65
3,083.25
16,032.90

1,200.00

Pekerjaan Kayu 226


BIAYA
SATUAN
( Rp. )
6

6,166.50
6,166.50
616.65
3,083.25
16,032.90

1,080.00

BIAYA
SATUAN
( Rp. )
6

6,166.50
6,166.50
616.65
3,083.25
1,603.29

13,200.00
1,080.00
9,996.00
11,599.29
11,599.29

BIAYA
SATUAN
( Rp. )

Pekerjaan Kayu 227


6

9,249.75
27,749.25
2,774.93
4,624.88
44,398.80

1,800.00

Pekerjaan Kayu 228


BIAYA
SATUAN
( Rp. )
6

9,249.75
27,749.25
2,774.93
4,624.88
44,398.80

1,800.00

BIAYA
SATUAN
( Rp. )
6

12,333.00
36,999.00
3,699.90
616.65
53,648.55

2,700.00

8,400.00

BIAYA

Pekerjaan Kayu 229


SATUAN
( Rp. )
6

36,999.00
110,997.00
11,099.70
1,849.95
160,945.65

1,800.00
17,648.98

Pekerjaan Kayu 230


BIAYA
SATUAN
( Rp. )
6

36,999.00
110,997.00
11,099.70
1,849.95
160,945.65

2,000.00
17,648.98

BIAYA
SATUAN
( Rp. )
6

1,541.63
4,624.88
493.32
61.67
6,721.49

900.00

BIAYA
SATUAN

Pekerjaan Kayu 231


( Rp. )
6

1,294.97
1,294.97
123.33
61.67
2,774.93

Pekerjaan Kayu 232


BIAYA
SATUAN
( Rp. )
6

110,997.00
36,999.00
11,099.70
1,849.95
160,945.65

4,000.00

BIAYA
SATUAN
( Rp. )
6

110,997.00
36,999.00
11,099.70
1,849.95
160,945.65

3,600.00

Pekerjaan Kayu 233


N. PEKERJAAN PENGECATAN (P.Ct.)

Pekerjaan Pengecatan 234


1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.070
2 Tukang Cat OH 61,665.00 0.009
3 Kepala Tukang OH 61,665.00 0.006
4 Mandor OH 61,665.00 0.0025
Jumlah
B BAHAN
1 Cat Meni Kg 30,000.00 0.000
2 Dempul Kg 25,000.00 0.150
3 Cat Dasar Kg 30,000.00 0.170
4 Cat Kilat Penutup 2 Kali Kg 30,000.00 0.130

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.8
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 3Lapis Cat Penutup) (P.
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.070
2 Tukang Cat OH 61,665.00 0.105
3 Kepala Tukang OH 61,665.00 0.004
4 Mandor OH 61,665.00 0.0025
Jumlah
B BAHAN
1 Cat Meni Kg 30,000.00 0.200
2 Dempul Kg 25,000.00 0.150
3 Cat Dasar Kg 30,000.00 0.170
4 Cat Kilat Penutup 3 Kali Kg 30,000.00 0.350

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.9
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 11)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS

Pekerjaan Pengecatan 235


No. URAIAN PEKERJAAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.015
2 Tukang Cat OH 61,665.00 0.010
3 Kepala Tukang OH 61,665.00 0.0020
4 Mandor OH 61,665.00 0.0010
Jumlah
B BAHAN
1 Plamur (dempul tembok) Kg 25,000.00 0.000
2 Cat Dasar tembok Kg 30,000.00 0.140
3 Cat Tembok Penutup 2 x Kg 24,000.00 0.300

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.14

Pekerjaan Pengecatan 236


Pekerjaan Pengecatan 237
s Cat Penutup) (P.Ct. 04)
BIAYA
SATUAN
( Rp. )
6

4,316.55
554.99
369.99
154.16
5,395.69

0.00
3,750.00
5,100.00
3,900.00
12,750.00
18,145.69
18,145.69

s Cat Penutup) (P.Ct. 05)


BIAYA
SATUAN
( Rp. )
6

4,316.55
6,474.83
246.66
154.16
11,192.20

6,000.00
3,750.00
5,100.00
10,500.00
25,350.00
36,542.20
36,542.20

at Penutup)

BIAYA
SATUAN

Pekerjaan Pengecatan 238


( Rp. )
6

924.98
616.65
123.33
61.67
1,726.62

0.00
4,200.00
7,200.00
11,400.00
13,126.62
13,126.62

Pekerjaan Pengecatan 239


LAMPIRAN 1 :

TENTANG
STANDAR HARGA SATUAN UPAH, BAHAN,
ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (A
DAN ANALISA E KOTA PONTIANAK

( Periode Januari s/d Desember 2012 )

HARGA

TANPA
NO TENAGA KERJA SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

A. UPAH
1 Mandor Lapangan Org/hari L.061 85,000.00
2 Mekanik Org/hari L.071 85,000.00
3 Kepala Tukang Org/hari L.073 85,000.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancan Org/hari L.079 78,000.00
5 Operator terlatih Org/hari L.081 70,000.00
6 Operator semi terlatih Org/hari L.082 62,000.00
7 Sopir Org/hari L.091 70,000.00
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 62,000.00
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 70,000.00

NO MATERIAL SATUAN

B. BAHAN PENGISI
1 Batu Kong M³
2 Batu Sap Pinang M³
3 Batu pecah 15-20 cm M³
4 Batu pecah 10-15 cm M³
5 Batu pecah 5-7 cm M³
6 Batu pecah 3-5 cm M³
7 Batu pecah 2-3 cm M³
NO MATERIAL SATUAN

8 Batu pecah 1-2 cm M³


9 Batu pecah 1-1 cm M³
10 Batu pecah 0,5 cm M³
11 Stone Dust M³
12 Aspal Kg
13 Pasir M³
14 Semen PC Zak
15 Semen PC Kg
16 Tanah Ex. Peniraman M³
17 Tanah EX. Peladis M³
18 Paving Block Bh
19 Paving Stone Bh
20 Batu Bata 5 x 11 x 22cm Bh
21 Bataco 15 x 30 x 7 cm Bh
22 Bataco 20 x 40 x 9 cm ( press ) Bh
23 Bataco 20 x 40 x 7 cm ( press ) Bh
24 Kerawang ( roster ) 18 x 18 cm Bh
25 Kerawang press ( roster ) 30 x 30 cm Bh
26 Keramik 20 x 20 cm Kotak
27 Keramik 30 x 30 cm Kotak
28 Keramik 30 x 30 cm Unpolished Kotak
29 Keramik 30 x 30 cm Artistik Kotak
30 Keramik 40 x 40 cm (biasa) Kotak
31 Keramik 40 x 40 cm Polished (setaraf Indogress) Kotak
32 Keramik 40 x 40 cm Polished (setaraf Decogress) Kotak
33 Keramik 40 x 40 cm Unpolished (setaraf Indogress) Kotak
34 Keramik 40 x 40 cm Unpolished (setaraf Decogress) Kotak
35 Keramik 60 x 60 cm Polished (setaraf Indogress) Kotak
36 Keramik 60 x 60 cm Polished (setaraf Decogress) Kotak
37 Granito 40 x 40 cm Kotak
38 Marmer M²
39 Wood Flooring M²
40 List Keramik WC. 8 x 20 cm Bh
41 Plint Kayu uk. 2 x 10 cm Bh
42 Keramik dinding 20 x 20 cm Kotak
43 Keramik dinding 20 x 25 cm Kotak
44 Floor Hardener Kg
45 Beton Ready Mix B 0 M³
46 Beton Ready Mix 125 M³
47 Beton Ready Mix 175 M³
48 Beton Ready Mix 225 M³
49 Beton Ready Mix 300 M³
NO MATERIAL SATUAN

50 Additive Ready Mix Liter


51 Karung Goni Curing Beton ( 0.7m² ) Lembar
52 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg
53 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg
54 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg
55 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg
56 Papan Turap Uk. 15/50 - 5m - K 300 Kpg
57 Papan Turap Uk. 15/50 - 6m - K 300 Kpg
58 Pemancangan Mini Pile - 6m Btg
59 Sewa Pompa Ready Mix (Min. 100 M³) M³
60 Bahan Plastik Cor Beton M²
NO MATERIAL SATUAN

C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M M³
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³
8 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M M³
10 Ky. Belian ketam Uk. 6/6 - 4 M M³
11 Ky. Belian ketam Uk. 7/7 - 4 M M³
12 Ky. Belian ketam Uk. 8/8 - 4 M M³
13 Ky. Belian ketam Uk. 5/10 - 4 M M³
14 Ky. Belian ketam Uk. 4/8 - 4 M M³
15 Papan belian ketam (4m) M³
16 Papan belian tdk ketam (4m) M³
17 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³
18 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³
19 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³
20 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³
21 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³
22 Kusen Ky Kelas I Bangkirai uk. 5/10 M³
23 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³
24 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³
25 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³
26 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³
27 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³
28 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³
29 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³
30 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³
31 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³
32 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³
33 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³
34 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³
35 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³
36 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³
37 Papan kayu klas II (mabang) tdk ketam M³
38 Papan kayu klas II (mabang) ketam M³
39 Papan kayu klas I tdk ketam M³
40 Papan kayu klas I ketam M³
NO MATERIAL SATUAN

41 Papan mal klas III M³


42 Papan Simpiran M³
43 Renglat kayu klas I uk 1/8 cm Btg
44 Kayu profil 10cm Btg
45 Kayu cerucuk /dolken ø 4 - 6 - Pj. 4 M Btg
46 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg
47 Kayu cerucuk /dolken ø 8 - 10 - Pj. 4 M Btg
48 Kayu cerucuk /dolken ø12 - Pj. 12 M Btg
49 Kayu cerucuk /dolken ø 15 - Pj. 12 M Btg
50 Kayu Simpiran / Bakar M³
51 Alas laci Btg
52 Wood Plank M'

D. BAHAN CAT
1 Amplas Lbr
2 Minyak cat Kg
3 Cat kilat Kg
4 Plamur Kg
5 Cat dasar Kg
6 Cat tembok Kg
7 Cat tembok type weather shield Kg
8 Cat tembok type weather coat (acrylic) Kg
9 Cat seng Kg
10 Dempul Kg
11 Plitur Kg
12 Thiner Ltr
13 Thiner ND Ltr
14 Melamic Ltr
15 Vernis Ltr
16 Meni Kg
17 Oker Kg
18 Lem Kayu Kg
19 Sealent Tube
20 Soda Api Kg
21 Sabun / cream pembersih kotoran Kg
22 Teak Oil Ltr
23 Ter / Residu Ltr
24 Kuas 4" Bh
25 Road Line Paint ( Cat Marka ) Ltr
26 Glass Bit Kg
27 Weatherbond Emulsion ( cat kerb ) Kg
28 Termoplast Kg
NO MATERIAL SATUAN

29 Water Proofing M²

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton Kg
2 Besi wire mesh ø 5 Kg
3 Kawat baja/bendrat Kg
4 Simpai roll Kg
5 Kawat simpai Kg
6 Baut dia 4/8 " pj = 20 cm Btg
7 Besi Penahan bh
8 Beugel plat L. 3 cm bh
9 Plat 1,2 x 2,4 x 12 Bh
10 Besi Konstruksi (I, H) Kg
11 Besi Konstruksi ( C ) Kg
12 Besi Konstruksi (siku ) Kg
13 Kawat Las Btg
NO MATERIAL SATUAN

14 Kawat Las Kg
15 Kawat harmonika M²
16 Kawat kasa M²
17 Pipa galvanis dia 3/4" Btg
18 Pipa galvanis dia 1/2" Btg
19 Pipa galvanis dia 1" Btg
20 Pipa galvanis dia 1 1/4" Btg
21 Pipa galvanis dia 1 1/2" Btg
22 Pipa galvanis dia 2" Btg
23 Pipa galvanis dia 3" Btg
24 Pipa galvanis dia 4" Btg
25 Folding gate M²
26 Rangka Aluminium 1 1/2" x 3" Meter
27 Rangka Aluminium 1 3/4" x 4" Meter
28 Pintu Aluminium std IKP, lengkap 4" Unit
29 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m) M²
30 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) M²
31 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m) M²
32 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 M²
33 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) M²
34 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m M²
35 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m) M²
36 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 M²
37 Alumunium Komposit + Rangka Besi M²
38 Rangka Plafond Metal Furing + Pemasangan M²

F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC Bh
2 Kait angin Bh
3 Handle Jendela Bh
4 Handle Pintu Bh
5 Engsel jendela Bh
6 Engsel pintu Bh
7 Slot pintu Bh
8 Slot jendela Bh
9 Kunci tanam 2 slag (setaraf Belluci) Bh
10 Kunci tanam 1 slag Bh
11 Kunci tanam antik Bh
12 Kunci tanam biasa Bh
13 Kunci silinder Bh
14 Door Closer Bh
15 Door Stoper Bh
NO MATERIAL SATUAN

16 Paku Seng Kg
17 Paku campuran 1" - 5 " Kg
18 Paku beton Kg
19 Paku Atap Seng Kg
20 Paku triplek Kg
21 Paku GRC Kg
22 Sekrup Gypsum Kg
23 Sekrup Fixer Bh
24 Sekrup Steel Sheet Bh
25 Sekrup Zincalume Bh
26 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm Unit
27 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm Unit
28 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm Unit
29 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca) Unit
30 Kusen Alumunium M'

G. BAHAN ATAP
1 Sirap belian Lbr
2 Asbes Lbr
3 Eternit M²
4 Genteng Metal Type Prima 0.35 Lbr
5 Genteng Metal Type Royal 0.35 Lbr
6 Genteng Metal Type Classic 0.35 Lbr
7 Genteng Metal Stone ( Type Classic 0.35 ) Lbr
8 Genteng Metal Stone ( Type Prima 0.35 ) Lbr
9 Atap Metal Supersheet 0.35 (polos) M'
10 Atap Metal Supersheet 0.35 (polos) M²
11 Atap Trim Deck 0.3 (polos) M²
12 Atap Trim Deck 0.33 (color) M²
13 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh
14 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh
15 Nok bubungan genteng metal kotak 0.35 M'
16 Nok bubungan genteng metal stone kotak 0.35 M'
17 Nok bubungan Trim Deck (polos) M'
18 Nok bubungan Trim Deck (color) M'
19 Nok bubungan Steel Sheet 0.33 (color) (pj 50 cm) M'
20 Nok bubungan Steel Sheet 0.43 (color) (pj 50 cm) M'
21 Nok bubungan Steel Sheet 0.35 (polos) (pj 50 cm) M'
22 Nok bubungan Steel Sheet 0.40 (polos) (pj 50 cm) M'
23 Seng Gelombang Bjls 30 Lbr
24 Seng Gelombang Bjls 20 Lbr
25 Seng Plat Bjls 20 Lbr
NO MATERIAL SATUAN

26 Seng Plat Bjls 30 Lbr


27 Seng Plat Bjls 30 (lebar 45 cm) M'
28 Plat Datar Color 0.35 Lbr
29 Zincalume Gelombang Persegi 0.35 (polos) M²
30 Zincalume Gelombang Persegi 0.30 (polos) M²
31 Zincalume Gelombang Persegi 0.35 (color) M²
32 Zincalume Gelombang Persegi 0.30 (color) M²
33 Zincalume Plat 0.2 Lbr
34 Aluminium Foil M²
35 Atap Steel Sheet 0.33 (color) M²
36 Atap Steel Sheet 0.40 (polos) M²
37 Papan Belian utk Atap uk. 1/15 pj. 50 cm Lbr

H. BAHAN KACA
1 Kaca Polos, t = 5 mm M²
2 Kaca Polos, t = 12mm M²
3 Kaca Rayben, t = 5 mm M²
4 Kaca Cermin t = 3mm M²
5 Kaca Patri M²
6 Sealent Kg
7 Nako + Bingkai (80 x 15) x 10 daun polos Bh
8 Nako + Bingkai (80 x 15) x 10 daun rayben Bh
9 Kaca Es M²
10 Kaca Polos, t = 8 mm M²
11 Kaca Raindown, t = 5 mm M²
12 Kaca Buram, t = 5 mm M²

I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr
2 Triplek t = 6 mm Lbr
3 Triplek t =9 mm Lbr
NO MATERIAL SATUAN

4 Multiplek t = 10 mm Lbr
5 Multiplek t = 12 mm Lbr
6 Plywood 4' x 8' x 4mm Lbr
7 Panel GRC 120 x 240 x 40 Lbr
8 GypsumBoard t = 9mm Lbr

J. BAHAN SANITASI
1 Kloset duduk monoblok Bh
2 Kloset duduk putih (setaraf TOTO) Bh
3 Kloset duduk warna (setaraf TOTO) Bh
4 Kloset jongkok (setaraf TOTO) Bh
5 Kloset jongkok (setaraf INA) Bh
6 Kran air uk 1/2" Bh
7 Pipa paralon dia 1/2" Btg
8 Pipa paralon dia 3/4" Btg
9 Pipa paralon dia 1" Btg
10 Pipa paralon dia 2" Btg
11 Pipa paralon dia 3" Btg
12 Pipa paralon dia 4" Btg
13 Pipa paralon dia 8" Btg

K. BAHAN MINYAK (TANPA KEUNTUNGAN)


1 Minyak solar non subsidi Ltr
2 Minyak solar Ltr
3 Minyak solar industri Ltr
4 Bensin premium Ltr
5 Minyak pelumas Ltr
6 Oli BEO 154W40/Cat Ltr
7 Minyak tanah Ltr
8 Gas Elpiji Kg
9 Alat-alat bantu Set
10 Sewa Alat Untuk Pengelasan Jam
11 Sewa Molen Set
12 Sewa kuali termasuk angkutan Set

L. BAHAN ALAT-ALAT LISTRIK


1 Armatur lampu High Mass Holovent 400 watt (lengkap) Unit
2 Armatur lampu SGP 338 / SONT 400 Watt Unit
3 Armatur lampu SGP 328 / SONT 250 Watt Unit
4 Armatur lampu SGP 338 / SONT 400 Watt (lengkap) Unit
5 Armatur lampu SGP 368 / SONT 250 Watt (lengkap) Unit
6 Armatur lampu LVD 100 Watt (lengkap) Unit
NO MATERIAL SATUAN

7 Armatur lampu Ekorola TRX 800 - 20 Watt (set) Set


8 Armatur lampu Sorot HPIT 250 Watt (lengkap) Set
9 Sorot HPIT 250 watt (lengkap) Set
10 XKS SON T 250 watt (lengkap) Set
11 Tiang Artagonal Cabang 2 T = 11 M Tiang
12 Tiang Artagonal Cabang 1 T = 11 M Tiang
13 Tiang Oktagonal Cabang 2 T = 11 M Btg
14 Tiang Oktagonal Cabang 1 T = 11 M Btg
15 Tiang high mass 22 m cab. 5 ring Tiang
16 Tiang high mass 22 m cab. 4 ring Tiang
17 Tiang lampu oktagonal 11 m Btg
18 Tiang lampu oktagonal 12 m Btg
19 Tiang lampu oktagonal cab. 4 Ring 12 Mtr Btg
20 Tiang lampu oktagonal cab. 2 (11m) Btg
21 Stang Ornamen Galvanis dia 2" Pj. 7 M + Klem Tiang Btg
22 Stang Ornamen Galvanis dia 2" Pj. 6 M + Klem Tiang Btg
23 Stang Ornamen Galvanis dia 2" Pj. 5 M + Klem Tiang Btg
24 Stang Ornamen Galvanis dia 2" Pj. 3 M + Klem Tiang 12
25 Stang Ornamen Galvanis dia 2" Pj. 2 M + Klem Tiang Btg
26 Box Panel PJU Uk. 60x90x30 Cm lengkap Time Swich Set
27 Box Panel PJU Uk. 50x45x25 Cm lengkap Time Swich Set
28 Box KWH Meter Uk. 35 x 50 x 25 cm Buah
29 Traffo HPL 400 Watt Buah
30 Traffo HPL 250 Watt Buah
31 Traffo HPL 125 Watt Buah
32 Traffo SOX 135 Watt Buah
33 Traffo SOX 180 Watt Buah
34 Traffo SON T 400 Watt Buah
35 Traffo SON T 250 Watt Buah
36 Traffo SON T 125 Watt Buah
37 Traffo SON T 70 Watt Buah
38 Traffo SON H 400 Watt Buah
39 Traffo SON H 250 Watt Buah
40 Traffo SON H 125 Watt Buah
41 Traffo SON H 70 Watt Buah
42 Traffo HPiT 400 Buah
43 Traffo Neon 40 Watt Buah
44 Traffo Neon 20 Watt Buah
45 Traffo Neon 10 Watt Buah
46 Traffo 400 Watt Buah
47 HPL 250 Watt Buah
48 HPL 125 Watt Buah
NO MATERIAL SATUAN

49 HPL 135 Watt Buah


50 SOX 180 Watt Buah
51 SOX 160 Watt Buah
52 MLL Buah
53 Bola SON T 1000 Watt Buah
54 Bola SON T 400 Watt Buah
55 Bola SON T 250 Watt Buah
56 Bola SON T 150 Watt Buah
57 Bola Lampu SON 70 Watt Buah
58 SON H 400 Watt Buah
59 SON H 250 Watt Buah
60 SON H 125 Watt Buah
NO MATERIAL SATUAN

61 SON H 70 Watt Buah


62 Bola Lampu HPIT 400 Watt Buah
63 HPIT 400 Watt Buah
64 Seri 200 Biji Kotak
65 Seri Kuning Kotak
66 Neon Sen Meter
67 Pijar 5 Watt Buah
68 Pijar 20 Watt Buah
69 Pijar 25 Watt Buah
70 Pijar 40 Watt Buah
71 Pijar 60 Watt Buah
72 Pijar 75 Watt Buah
73 Pijar 80 Watt Buah
74 Pijar 100 Watt Buah
75 Pijar 200 Watt Buah
76 Neon 40 Watt Buah
77 Neon 20 Watt Buah
78 Neon 10 Watt Buah
79 Lampu Ekorola TRX 800 - 20 watt (set) Set
80 Lampu Light Grick Buah
81 Lampu Genite 16 Watt Buah
82 Lampu XL 14 Watt Buah
83 Lampu Sorot 300 Watt Buah
84 Lampu Nepalos 25 Watt Buah
85 Lampu Superlox 25 Watt Buah
86 Lampu Superlox 40 Watt Buah
87 Lampu Fisikom 25 Watt Buah
88 Lampu Fisikom 23 Watt Buah
89 Lampu Fisikom 18 Watt Buah
90 Lampu Mercury 125 Watt Buah
91 Lampu Mercury 250 Watt Buah
92 Lampu Sunyco 45 Watt Buah
93 Lampu Matsuka 8 Watt Buah
94 Lampu Matsuka 14 Watt Buah
95 Lampu Matsuka 18 Watt Buah
96 Lampu Matsuka 20 Watt Buah
97 Lampu Matsuka 25 Watt Buah
98 Lampu Par 38 Watt Buah
99 Lampu Taman Buah
100 SL 15 Watt Buah
101 SL 18 Watt Buah
102 SL 25 Watt Buah
NO MATERIAL SATUAN

103 TL Rina 32 Watt Buah


104 Bola Essetial Buah
105 Bola Spot Light Buah
106 Bola Lampu Sorot 300 Watt Buah
107 Hologen 500 Watt Buah
108 Hologen 1.000 Watt Buah
109 Hologen 1 x 1.5 mm Buah
110 NYY 1 x 2.5 mm Meter
111 NYY 1 x 4 mm Meter
112 NYY 1 x 6 mm Meter
113 NYY 2 mm Meter
114 NYY 2 x 2.5 mm Meter
115 NYY 2 x 4 mm Meter
116 NYY 2 x 6 mm Meter
117 NYY 2 x 10 mm Meter
118 NYY 3 x 4 mm Meter
119 NYY 4 x 2.5 mm Meter
120 NYY 4 x 4 mm Meter
121 NYY 4 x 6 mm Meter
122 NYY 4 x 10 mm Meter
123 NYY 4 x 16 mm Meter
124 NYY 4 x 25 mm Meter
125 NYY 4 x 35 mm Meter
126 NYY 4 x 50 mm Meter
127 NYY 4 x 70 mm Meter
128 NYN 2 x 2,5 mm Meter
129 NYN 3 x 1,5 mm Meter
130 NYN 3 x 2,5 mm Meter
131 NYA 1 x 1,5 mm Meter
132 NYA 1 x 2,5 mm Meter
133 NYA 1 x 4 mm Meter
134 NYA 1 x 6 mm Meter
135 NYF6BY 2 x 2,5 mm Meter
136 NYF6BY 2 x 4 mm Meter
137 NYF6BY 2 x 30 mm Meter
138 NYF6BY 4 x 6 mm Meter
139 NYF6BY 1,5 mm Meter
140 NYF6BY 4 mm Meter
141 NYM 10 mm Meter
142 NYM 16 mm Meter
143 NYM Meter
144 NYM Meter
NO MATERIAL SATUAN

145 NYM Meter


146 NYM Meter
147 NYM Meter
148 NYM Meter
149 NYM 4 mm Meter
150 NYM 3 x 4 mm Meter
151 NYM 2 x 2 mm Meter
152 NYMHYM2 x 4 mm Meter
NO MATERIAL SATUAN

153 NYMHYM2 x 2,5 mm Meter


154 Traffo S 2 x 1,5 mm Buah
155 Kabel Sn3 x 1,5 mm Roll
156 Kabel Tes3 x 2,5 mm Meter
157 Kabel Bo3 x 10 mm Meter
158 Kabel Mi 4 x 2,5 mm Roll
159 Kabel 3 4 x 4 mm Meter
160 Kabel Antena Roll
161 Kabel H / M Meter
162 Kabel Transparan Meter
163 Kabel Telepon Meter
164 Kabel TC 2 x 10 mm Meter
165 Kabel TC 2 x 16 mm Meter
166 Box TL 20 Watt Buah
167 Box MCB 1 Group Buah
168 Cal Gulung Buah
169 Contactor 100 A Buah
170 Conector Buah
171 Dop 3" Buah
172 Esensial Buah
173 Fitting Gantung Buah
174 Fitting Duduk Buah
175 Fitting Atom Buah
176 Fitting Gantung E 27 Buah
177 Fitting Duduk E 27 Buah
178 Fitting Duduk E 40 Buah
179 Fitting Hologen Buah
180 Full Breket Buah
181 Gulung Spul Buah
182 Gulung Coil Contactor Buah
183 Isolasi Unibel Buah
184 Icnitor SN 58 Buah
185 Inector Buah
186 Ignator Buah
187 Indiktor Buah
188 Insuluk Buah
189 Kapasitor Buah
190 Kap Hijau E 27 Buah
191 Kap Hijau E 40 Buah
192 Kap Lampu Buah
193 Kap To2 Buah
194 Kop Skring Buah
NO MATERIAL SATUAN

195 Klem Tiang Buah


196 k. Skum 10-8 Buah
197 MCB 1.A Buah
198 MCB 2.A Buah
199 MCB 25 A Buah
200 MCB 63 A Buah
201 MCB 40 A Buah
202 MCB 45 A Buah
203 MCB 50 A Buah
204 MCB 10 A Buah
205 MCB 16 A Buah
206 MCB 6 A Buah
207 MCB 32 A Buah
208 MCB Box Buah
209 Multi Tester Buah
210 MC Se-3 N Buah
211 Macon Mec gmg-50 aC Buah
212 Magnetic Contactor 100 A Buah
213 NH Fuse 80 A Buah
214 Ornamen Pijar Buah
215 Ornamen Gantung Buah
216 Obeng Plus Buah
217 Obeng Minus Buah
218 Open Steker Buah
219 On - Off Buah
220 Pat 38 Buah
221 Solar Seal / Photo Seal Buah
222 Opstic 1/2" lengkap klem Batang
223 Pipa Paralon 1/2" Batang
224 Pipa L 1/2" Batang
225 Pipa Paralon 1' Batang
226 Pipa Paralon 3/4" Batang
227 Pipa Paralon 3' Batang
228 Pipa PVC 1,5" Batang
229 Pipa PVC Galvanis 1,5" Batang
230 Pipa Besi Batang
231 Pipa Galvanis Batang
232 Pipa ornamen dia 2" x 2m Batang
233 Pipa ornamen dia 2" x 3m lengkap klem Batang
234 Pipa ornamen dia 2" x 6m lengkap klem Batang
235 Pipa ornamen dia 2" x 7m lengkap klem Batang
236 Pondasi tiang lampu oktagonal (11 meter) Unit
NO MATERIAL SATUAN

237 Pres Conector Buah


238 Rangka Ring 32 Watt Buah
239 Rel MCB Buah
240 Roset Telpon Buah
241 Saklar Double Buah
242 Saklar Engkel Buah
243 Saklar Tripel Buah
244 Spul Contactor Buah
245 Sekring 63 A Buah
246 Solder Pistol Buah
247 Solder Buah
NO MATERIAL SATUAN

248 Solar Seal / Photo Seal Buah


249 Stop Kontak Buah
250 Steker Arde Buah
251 Steker T Buah
252 Steker PH Buah
253 Sadel No. 6 Bungkus
254 Sadel No. 8 Bungkus
255 Sadel No. 9 Bungkus
256 Sadel No. 10 Bungkus
257 Sadel No. 12 Bungkus
258 Sadel No. 14 Bungkus
259 Sadel No. 19 Bungkus
260 Sadel No. 22 Bungkus
261 Skun RS-16 Buah
262 Stater Buah
263 Ston 63 A Buah
264 Stost 40 A + Ip Buah
265 Stost 32 A + Ip Buah
266 Tedus Hitam Buah
267 Tali Tester Buah
268 Tang Amper Buah
269 Tang Buaya Buah
270 Tang Potong Buah
271 Tang Kombinasi Buah
272 Tang Jepit Buah
273 Tang Skun Buah
274 Time Swicht Theben Buah
275 Taping Buah
276 Taping Conector 1 baut Buah
277 Taping Conector 2 baut Buah
278 Tespen Buah
279 Timah Solder Buah
280 Terminal 25 ml Buah
281 Tolkit Buah
282 Wedge Klem Buah
283 Wide Klem Buah
284 WD 40 Buah
285 Klem Tiang uk. 5" s/d 8" x 2" Set
TENTANG
ARGA SATUAN UPAH, BAHAN,
I STANDAR NASIONAL INDONESIA (ABK-SNI)
ALISA E KOTA PONTIANAK

Januari s/d Desember 2012 )

HARGA

HARGA TERMASUK
KEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD)
(Rp) (Rp)

8,500.00 93,500.00
8,500.00 93,500.00
8,500.00 93,500.00
7,800.00 85,800.00
7,000.00 77,000.00
6,200.00 68,200.00
7,000.00 77,000.00
6,200.00 68,200.00
7,000.00 77,000.00

HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.101 192,500.00
- 220,000.00
- 259,880.00
M.020 275,000.00
M.022 385,000.00
M.023 330,000.00
M.024 359,700.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.025 418,620.00
- 467,500.00
M.026 476,670.00
- 408,540.00
- 10,890.00
M.040 91,300.00
M.080 72,820.00
- 1,460.00
M.050.a 120,000.00
M.050 238,340.00
- 2,640.00
- 4,360.00
- 2,790.00
- 1,040.00
- 2,530.00
- 2,310.00
- 29,700.00
- 45,100.00
- 52,440.00
- 45,930.00
- 57,750.00
- 64,130.00
- 71,390.00
- 130,170.00
- 113,670.00
- 167,750.00
- 148,500.00
- 308,000.00
- 242,000.00
- 193,470.00
- 499,130.00
- 302,500.00
- 8,800.00
- 60,500.00
- 56,650.00
- 56,830.00
- 9,080.00
- 834,900.00
- 877,250.00
- 943,800.00
- 1,046,650.00
- 1,143,450.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 44,000.00
- 12,710.00
- 1,270,500.00
- 1,669,800.00
- 1,089,000.00
- 1,216,050.00
- 968,000.00
- 1,234,200.00
- 145,200.00
- 60,500.00
- 3,850.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 14,513,890.00
- 13,857,640.00
- 11,806,930.00
- 9,227,860.00
M.181.a 14,655,350.00
M.181.b 11,435,420.00
- 11,458,340.00
- 8,107,850.00
- 13,566,670.00
- 16,041,670.00
- 14,057,340.00
- 13,646,880.00
- 18,333,340.00
- 13,893,230.00
M.181.e 16,958,370.00
M.181.d 15,074,070.00
M.181.f 11,733,340.00
M.181.g 11,733,340.00
- 8,983,340.00
- 8,983,340.00
- 11,550,000.00
- 115,500.00
M.181.h 3,646,680.00
M.181.i 3,915,320.00
- 5,219,520.00
- 5,490,840.00
- 2,764,960.00
- 2,716,480.00
- 4,393,890.00
- 3,858,150.00
- 4,094,370.00
- 5,188,340.00
- 3,807,230.00
- 4,947,360.00
- 2,813,560.00
- 2,436,300.00
M.181.j 6,518,520.00
M.181.k 6,569,450.00
- 9,052,120.00
- 10,388,890.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.181.l 1,599,590.00
- 1,159,550.00
- 42,680.00
- 31,900.00
- 5,630.00
- 13,750.00
- 10,450.00
- 80,850.00
- 99,000.00
- 219,620.00
- 16,500.00
- 60,500.00

- 2,840.00
- 28,190.00
- 45,650.00
- 29,520.00
- 47,850.00
- 73,920.00
- 180,840.00
- 180,680.00
- 194,150.00
- 36,990.00
- 50,160.00
M.090.f 26,090.00
- 32,450.00
- 58,300.00
- 71,370.00
- 65,220.00
- 55,920.00
- 21,520.00
- 137,500.00
- 19,800.00
- 20,350.00
- 48,400.00
- 58,300.00
- 20,680.00
M.090.e 99,000.00
M.090.g 40,170.00
M.090.h 110,000.00
- 41,270.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 72,600.00

M.167 15,600.00
- 20,610.00
M.168 19,800.00
- 23,420.00
- 54,380.00
M.163 8,250.00
- 33,000.00
- 42,350.00
- 490,050.00
- 19,730.00
- 20,450.00
- 20,450.00
- 22,550.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 126,500.00
- 39,880.00
- 15,130.00
- 148,610.00
- 121,880.00
- 191,510.00
- 269,830.00
- 312,730.00
- 384,450.00
- 614,350.00
- 837,380.00
- 715,000.00
- 90,750.00
- 116,160.00
- 2,631,750.00
- 205,700.00
- 290,400.00
- 217,800.00
- 326,700.00
- 193,600.00
- 242,000.00
- 205,700.00
- 278,300.00
- 1,045,000.00
- 148,500.00

- 302,500.00
- 14,850.00
- 16,500.00
- 162,250.00
- 24,750.00
- 33,000.00
- 20,350.00
- 23,930.00
- 184,250.00
- 187,000.00
- 179,020.00
- 88,550.00
- 110,000.00
- 231,000.00
- 77,000.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.166.a 24,530.00
M.166.b 20,900.00
- 27,500.00
M.166.c 27,500.00
- 28,870.00
- 28,870.00
- 96,800.00
- 1,650.00
- 530.00
580.00
- 4,840,000.00
- 2,420,000.00
- 1,815,000.00
- 726,000.00
- 84,700.00

- 6,050.00
- 56,650.00
- 78,650.00
- 69,630.00
- 69,630.00
- 67,320.00
- 88,880.00
- 88,880.00
- 93,500.00
- 128,630.00
- 114,950.00
- 129,110.00
- 71,500.00
- 88,000.00
- 93,900.00
- 111,320.00
- 125,840.00
- 141,570.00
- 50,820.00
- 58,080.00
- 47,190.00
- 50,820.00
- 72,770.00
- 51,370.00
- 52,800.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 72,770.00
- 22,990.00
- 62,340.00
- 138,070.00
- 121,490.00
- 154,760.00
- 138,070.00
- 143,990.00
- 60,500.00
- 128,150.00
- 128,150.00
- 16,500.00

- 133,100.00
- 605,000.00
- 160,930.00
- 242,000.00
- 3,025,000.00
- 122,820.00
- 280,720.00
- 309,760.00
- 183,920.00
- 313,500.00
- 159,500.00
- 159,500.00

- 52,190.00
- 230,220.00
- 165,830.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 205,700.00
- 229,270.00
- 109,340.00
- 64,970.00
- 67,100.00

- 1,870,000.00
- 2,252,250.00
- 2,475,000.00
- 212,030.00
- 147,130.00
- 38,500.00
- 17,910.00
- 27,670.00
- 40,700.00
- 61,820.00
- 117,150.00
- 176,830.00
- 700,000.00

M.183 9,950.00
M.183 4,525.00
- 10,550.00
M.184 4,950.00
M.185 26,625.00
- 51,325.00
M.064 9,650.00
- 9,150.00
M.170 62,700.00
- 68,750.00
- 165,000.00
- 69,650.00

16,410,050.00
- 6,802,975.00
- 4,642,450.00
- 6,362,500.00
- 5,327,925.00
- 6,155,475.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 678,625.00
- 8,320,175.00
- 6,933,500.00
- 4,486,375.00
- 9,664,950.00
- 8,482,175.00
- 9,019,500.00
- 9,473,150.00
- 83,772,750.00
- 100,526,200.00
- 13,508,050.00
- 15,406,925.00
- 13,507,775.00
- 14,193,250.00
- 1,225,150.00
- 1,225,100.00
- 1,140,625.00
- 849,975.00
- 644,350.00
- 5,812,750.00
- 4,207,725.00
- 993,925.00
- 311,225.00
- 251,800.00
- 155,600.00
- 1,050,475.00
- 1,050,475.00
- 1,158,450.00
- 572,600.00
- 466,575.00
- 371,800.00
- 180,150.00
- 510,100.00
- 350,150.00
- 309,500.00
- 184,750.00
- 337,125.00
- 24,450.00
- 20,400.00
- 17,950.00
- 252,950.00
- 184,850.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 87,500.00
- 605,150.00
- 605,150.00
- 87,500.00
- 925,400.00
- 419,500.00
- 404,425.00
- 309,500.00
- 210,050.00
- 350,150.00
- 350,150.00
- 309,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 186,925.00
- 448,025.00
- 432,050.00
- 73,800.00
- 73,800.00
- 55,400.00
- 2,800.00
- 4,650.00
- 4,650.00
- 4,650.00
- 6,600.00
- 6,600.00
- 5,250.00
- 8,300.00
- 18,425.00
- 54,300.00
- 29,425.00
- 15,325.00
- 716,200.00
- 175,450.00
- 55,400.00
- 46,125.00
- 183,025.00
- 46,125.00
- 7,325.00
- 8,300.00
- 46,125.00
- 46,125.00
- 36,975.00
- 93,450.00
- 197,300.00
- 110,775.00
- 27,700.00
- 29,525.00
- 42,450.00
- 49,900.00
- 51,750.00
- 68,325.00
- 46,125.00
- 153,750.00
- 59,900.00
- 77,450.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 36,850.00
- 44,400.00
- 69,175.00
- 183,025.00
- 53,575.00
- 105,300.00
- 119,950.00
- 3,950.00
- 6,150.00
- 9,675.00
- 14,950.00
- 16,250.00
- 23,300.00
- 22,100.00
- 29,150.00
- 31,600.00
- 31,200.00
- 46,125.00
- 74,900.00
- 101,900.00
- 87,725.00
- 363,850.00
- 406,300.00
- 498,525.00
- 179,100.00
- 20,650.00
- 16,900.00
- 24,625.00
- 23,075.00
- 35,275.00
- 40,200.00
- 60,050.00
- 169,450.00
- 186,750.00
- 221,625.00
- 272,875.00
- 363,650.00
- 471,325.00
- 4,750.00
- 26,225.00
- 7,925.00
- 19,525.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 13,550.00
- 5,875.00
- 7,325.00
- 10,500.00
- 36,850.00
- 13,425.00
- 33,925.00
- 4,150.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 7,075.00
- 1,237,175.00
- 73,800.00
- 36,850.00
- 73,800.00
- 240,000.00
- 10,500.00
- 46,125.00
- 2,700.00
- 3,675.00
- 2,200.00
- 9,450.00
- 13,175.00
- 11,000.00
- 5,500.00
- 73,800.00
- 1,472,175.00
- 10,625.00
- 9,275.00
- 46,125.00
- 1,950.00
- 4,650.00
- 36,975.00
- 23,225.00
- 23,225.00
- 29,450.00
- 36,975.00
- 16,650.00
- 92,375.00
- 92,375.00
- 6,600.00
- 132,950.00
- 110,775.00
- 128,700.00
- 173,250.00
- 425.00
- 207,900.00
- 36,600.00
- 58,575.00
- 129,200.00
- 129,200.00
- 5,575.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 14,825.00
- 1,125.00
- 39,950.00
- 46,600.00
- 203,325.00
- 333,150.00
- 173,050.00
- 224,800.00
- 313,625.00
- 149,100.00
- 159,725.00
- 179,225.00
- 375,350.00
- 4,650.00
- 83,100.00
- 1,213,375.00
- 664,825.00
- 1,766,600.00
- 33,300.00
- 433,500.00
- 64,650.00
- 46,600.00
- 46,600.00
- 39,950.00
- 8,350.00
- 69,250.00
- 166,175.00
- 304,900.00
- 10,200.00
- 2,800.00
- 12,025.00
- 11,100.00
- 22,200.00
- 57,900.00
- 199,650.00
- 110,775.00
- 129,275.00
- 583,700.00
- 757,925.00
- 1,524,500.00
- 1,698,725.00
- 1,916,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 3,750.00
- 18,425.00
- 27,700.00
- 6,525.00
- 8,350.00
- 5,725.00
- 22,200.00
- 73,800.00
- 12,025.00
- 406,300.00
- 27,700.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 166,175.00
- 5,575.00
- 11,100.00
- 12,925.00
- 3,750.00
- 1,300.00
- 1,750.00
- 1,925.00
- 5,125.00
- 6,600.00
- 3,750.00
- 5,575.00
- 11,150.00
- 1,300.00
- 3,750.00
- 166,225.00
- 70,225.00
- 46,175.00
- 950.00
- 27,700.00
- 1,200,425.00
- 36,950.00
- 36,950.00
- 36,950.00
- 36,950.00
- 369,350.00
- 788,200.00
- 609,450.00
- 14,250.00
- 23,225.00
- 9,225.00
- 27,700.00
- 46,175.00
- 83,100.00
- 5,575.00
- 8,550.00
- 46,175.00
- 256,225.00
LAMPIRAN 1 : KEPUTUSAN WALIKOTA PONTIAN
NOMOR : …………………... T

TENTANG
STANDARISASI HARGA SATUAN BAHAN, UPAH DAN ANALI
BIAYA PEKERJAAN YANG TERDIRI DARI ANALISA E DAN ANA
BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN (ABK-SNI) K
TAHUN ANGGARAN 2010

( Periode Januari s/d Desember 2010 )

HARGA

TANPA
NO TENAGA KERJA SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

A. UPAH
1 Mandor Lapangan Org/hari L.061 60,500.00
2 Mekanik Org/hari L.071 60,500.00
3 Kepala Tukang Org/hari L.073 60,500.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 55,000.00
5 Operator terlatih Org/hari L.081 49,500.00
6 Operator semi terlatih Org/hari L.082 44,000.00
7 Sopir Org/hari L.091 49,500.00
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 44,000.00
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 49,500.00

NO MATERIAL SATUAN

B. BAHAN PENGISI
1 Batu Kong M³
2 Batu Sap Pinang M³
3 Batu pecah 15-20 cm M³
4 Batu pecah 10-15 cm M³
5 Batu pecah 5-7 cm M³
6 Batu pecah 3-5 cm M³
NO MATERIAL SATUAN

7 Batu pecah 2-3 cm M³


8 Batu pecah 1-2 cm M³
9 Batu pecah 1-1 cm M³
10 Batu pecah 0,5 cm M³
11 Stone Dust M³
12 Aspal Kg
13 Pasir M³
14 Semen PC Zak
15 Semen PC Kg
16 Tanah Ex. Peniraman M³
17 Tanah EX. Peladis M³
18 Paving Block Bh
19 Paving Stone Bh
20 Batu Bata 5 x 11 x 22cm Bh
21 Bataco 15 x 30 x 7 cm Bh
22 Bataco 20 x 40 x 9 cm ( press ) Bh
23 Bataco 20 x 40 x 7 cm ( press ) Bh
24 Kerawang ( roster ) 18 x 18 cm Bh
25 Kerawang press ( roster ) 30 x 30 cm Bh
26 Keramik 20 x 20 cm Kotak
27 Keramik 30 x 30 cm Kotak
28 Keramik 30 x 30 cm Unpolished Kotak
29 Keramik 30 x 30 cm Artistik Kotak
30 Keramik 40 x 40 cm (biasa) Kotak
31 Keramik 40 x 40 cm (anti gores) Kotak
32 Keramik 40 x 40 cm Unpolished Kotak
33 Keramik 60 x 60 cm (anti gores) Kotak
34 Granito 40 x 40 cm Kotak
35 Marmer M²
36 Wood Flooring M²
37 List Keramik WC. 8 x 20 cm Bh
38 Plint Kayu uk. 2 x 10 cm M1
39 Keramik dinding 20 x 20 cm Kotak
40 Keramik dinding 20 x 25 cm Kotak
41 Floor Hardener Kg
42 Beton Ready Mix B 0 M³
43 Beton Ready Mix 125 M³
44 Beton Ready Mix 175 M³
45 Beton Ready Mix 225 M³
46 Beton Ready Mix 300 M³
47 Additive Ready Mix M³
48 Karung Goni Curing Beton ( 0.7m² ) Gulung
NO MATERIAL SATUAN

49 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg
50 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg
51 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg
52 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg
53 Papan Turap Uk. 15/50 - 5m Kpg
54 Papan Turap Uk. 15/50 - 6m Kpg
55 Pemancangan Mini Pile - 6m Btg
56 Sewa Pompa Ready Mix (Min. 100 M³) M³
57 Bahan Plastik Cor Beton M²
NO MATERIAL SATUAN

C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³
4 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³
5 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³
6 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³
7 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³
8 Ky. Belian ketam Uk. 6/6 - 4 M M³
9 Ky. Belian ketam Uk. 7/7 - 4 M M³
10 Ky. Belian ketam Uk. 8/8 - 4 M M³
11 Ky. Belian ketam Uk. 5/10 - 4 M M³
12 Ky. Belian ketam Uk. 4/8 - 4 M M³
13 Papan belian ketam (4m) M³
14 Papan belian tdk ketam (4m) M³
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³
16 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³
17 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³
20 Kusen Ky Kelas I Bangkirai uk. 5/10 M³
21 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³
22 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³
23 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³
24 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³
25 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³
26 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³
27 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³
28 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³
29 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³
30 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³
31 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³
32 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³
33 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³
34 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³
35 Papan kayu klas II (mabang) tdk ketam M³
36 Papan kayu klas II (mabang) ketam M³
37 Papan kayu klas I tdk ketam M³
38 Papan kayu klas I ketam M³
39 Papan mal klas III M³
40 Papan Simpiran M³
NO MATERIAL SATUAN

41 Renglat kayu klas I uk 1/8 cm Btg


42 Kayu profil 10cm Btg
43 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg
44 Kayu cerucuk /dolken ø10 - Pj. 4 M Btg
45 Kayu cerucuk /dolken ø12 - Pj. 12 M Btg
46 Kayu cerucuk /dolken ø 15 - Pj. 12 M Btg
47 Kayu Simpiran / Bakar M³
48 Alas kayu hutan Btg

D. BAHAN CAT
1 Amplas Lbr
2 Minyak cat Kg
3 Cat kilat Kg
4 Plamur Kg
5 Cat dasar Kg
6 Cat tembok Kg
7 Cat tembok type weather shield Kg
8 Cat tembok type weather coat (acrylic) Kg
9 Cat seng Kg
10 Dempul Kg
11 Plitur Kg
12 Thiner Ltr
13 Thiner ND Ltr
14 Melamic Ltr
15 Vernis Ltr
16 Meni Kg
17 Oker Kg
18 Lem Kayu Kg
19 Sealent Tube
20 Soda Api Kg
21 Sabun / cream pembersih kotoran Kg
22 Teak Oil Ltr
23 Ter / Residu Ltr
24 Kuas 4" Bh
25 Road Line Paint ( Cat Marka ) Ltr
26 Glass Bit Kg
27 Weatherbond Emulsion ( cat kerb ) Kg
28 Termoplast Kg

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton Kg
2 Besi wire mesh ø 5 Kg
NO MATERIAL SATUAN

3 Kawat baja/bendrat Kg
4 Simpai roll Kg
5 Kawat simpai Kg
6 Baut dia 4/8 " pj = 20 cm Btg
7 Besi Penahan bh
8 Beugel plat L. 3 cm bh
9 Plat 1,2 x 2,4 x 12 Bh
10 Besi Konstruksi (I, H) Kg
11 Besi Konstruksi ( C ) Kg
12 Besi Konstruksi (siku ) Kg
13 Kawat Las Btg
NO MATERIAL SATUAN

14 Kawat Las Kg
15 Kawat harmonika M²
16 Kawat kasa M²
17 Pipa galvanis dia 3/4" Btg
18 Pipa galvanis dia 1/2" Btg
19 Pipa galvanis dia 1" Btg
20 Pipa galvanis dia 1 1/4" Btg
21 Pipa galvanis dia 1 1/2" Btg
22 Pipa galvanis dia 2" Btg
23 Pipa galvanis dia 3" Btg
24 Pipa galvanis dia 4" Btg
25 Folding gate M²
26 Rangka Aluminium 1 1/2" x 3" Meter
27 Rangka Aluminium 1 3/4" x 4" Meter
28 Pintu Aluminium std IKP, lengkap 4" Unit
29 Rangka Baja Ringan Zincalume (truss/color) + Pemasangan M²
30 Rangka Baja Ringan Zincalume (truss/polos) + Pemasangan M²
31 Alumatek Unit

F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC Bh
2 Kait angin Bh
3 Handle Jendela Bh
4 Handle Pintu Bh
5 Engsel jendela Bh
6 Engsel pintu Bh
7 Slot pintu Bh
8 Slot jendela Bh
9 Kunci tanam 2 slag (setaraf Belluci) Bh
10 Kunci tanam 1 slag Bh
11 Kunci tanam antik Bh
12 Kunci tanam biasa Bh
13 Kunci silinder Bh
14 Door Closer Bh
15 Door Stoper Bh
16 Paku Seng Kg
17 Paku campuran 1" - 5 " Kg
18 Paku beton Kg
19 Paku Atap Seng Kg
20 Paku triplek Kg
21 Paku GRC Kg
22 Paku Zincallume Kg
NO MATERIAL SATUAN

23 Sekrup Gypsum Kg
24 Sekrup Fixer Bh
25 Engsel Angin Bh

G. BAHAN ATAP
1 Sirap belian Lbr
2 Asbes Lbr
3 Eternit M²
4 Genteng Metal Type Prima 0.35 Lbr
5 Genteng Metal Type Royal 0.35 Lbr
6 Genteng Metal Type Classic 0.35 Lbr
7 Genteng Metal Stone ( Type Classic 0.35 ) Lbr
8 Genteng Metal Stone ( Type Prima 0.35 ) Lbr
9 Atap Metal Supersheet 0.35 (polos) M'
10 Atap Metal Supersheet 0.35 (polos) M²
11 Atap Trim Deck 0.3 (polos) M²
12 Atap Trim Deck 0.33 (color) M²
13 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh
14 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh
15 Nok bubungan genteng metal kotak 0.35 M'
16 Nok bubungan genteng metal stone kotak 0.35 M'
17 Nok bubungan Trim Deck (polos) M'
18 Nok bubungan Trim Deck (color) M'
19 Seng Gelombang Bjls 30 Lbr
20 Seng Gelombang Bjls 20 Lbr
21 Seng Plat Bjls 20 Lbr
22 Seng Plat Bjls 30 Lbr
23 Seng Plat Bjls 30 (lebar 45 cm) M'
24 Plat Datar Color 0.35 Lbr
25 Zincalume Gelombang Persegi 0.35 (polos) M²
26 Zincalume Gelombang Persegi 0.30 (polos) M²
27 Zincalume Gelombang Persegi 0.35 (color) M²
28 Zincalume Gelombang Persegi 0.30 (color) M²
29 Zincalume Plat 0.2 Lbr
30 Aluminium Foil M²

H. BAHAN KACA
1 Kaca Polos, t = 5 mm M²
2 Kaca Polos, t = 12mm M²
3 Kaca Rayben, t = 5 mm M²
4 Kaca Cermin t = 3mm M²
5 Kaca Patri M²
NO MATERIAL SATUAN

6 Sealent Kg
7 Nako + Bingkai (80 x 15) x 10 daun polos Bh
8 Nako + Bingkai (80 x 15) x 10 daun rayben Bh
9 Kaca Es M²

I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr
2 Triplek t = 6 mm Lbr
3 Triplek t =9 mm Lbr
4 Multiplek t = 10 mm Lbr
5 Multiplek t = 12 mm Lbr
NO MATERIAL SATUAN

6 Plywood 4' x 8' x 4mm Lbr


7 Panel GRC 120 x 240 x 40 Lbr
8 GypsumBoard t = 9mm Lbr

J. BAHAN SANITASI
1 Kloset duduk monoblok Bh
2 Kloset duduk putih (setaraf TOTO) Bh
3 Kloset duduk warna (setaraf TOTO) Bh
4 Kloset jongkok (setaraf TOTO) Bh
5 Kloset jongkok (setaraf INA) Bh
6 Kran air uk 1/2" Bh
7 Pipa paralon dia 1/2" Btg
8 Pipa paralon dia 3/4" Btg
9 Pipa paralon dia 1" Btg
10 Pipa paralon dia 2" Btg
11 Pipa paralon dia 3" Btg
12 Pipa paralon dia 4" Btg

K. BAHAN MINYAK (TANPA KEUNTUNGAN)


1 Minyak solar Ltr
2 Minyak solar industri Ltr
3 Bensin premium Ltr
4 Minyak pelumas Ltr
5 Oli BEO 154W40/Cat Ltr
6 Minyak tanah Ltr
7 Minyak tanah industri Ltr
8 Gas Elpiji Kg
9 Alat-alat bantu Set
10 Sewa Alat Untuk Pengelasan Jam
11 Sewa Molen Set
12 Sewa kuali termasuk angkutan Set

L. BAHAN ALAT-ALAT LISTRIK


1 Armatur lampu High Mass Holovent 400 watt (lengkap) Unit
2 Armatur lampu SGP 338 / SONT 400 Watt Unit
3 Armatur lampu SGP 328 / SONT 250 Watt Unit
4 Armatur lampu SGP 338 / SONT 400 Watt (lengkap) Unit
5 Armatur lampu SGP 368 / SONT 250 Watt (lengkap) Unit
6 Armatur lampu LVD 100 Watt (lengkap) Unit
7 Armatur lampu Ekorola TRX 800 - 20 Watt (set) Set
8 Armatur lampu Sorot HPIT 250 Watt (lengkap) Set
9 Sorot HPIT 250 watt (lengkap) Set
NO MATERIAL SATUAN

10 XKS SON T 250 watt (lengkap) Set


11 Tiang Artagonal Cabang 2 T = 11 M Tiang
12 Tiang Artagonal Cabang 1 T = 11 M Tiang
13 Tiang Oktagonal Cabang 2 T = 11 M Btg
14 Tiang Oktagonal Cabang 1 T = 11 M Btg
15 Tiang high mass 22 m cab. 5 ring Tiang
16 Tiang high mass 22 m cab. 4 ring Tiang
17 Tiang lampu oktagonal 11 m Btg
18 Tiang lampu oktagonal 12 m Btg
19 Tiang lampu oktagonal cab. 4 Ring 12 Mtr Btg
20 Tiang lampu oktagonal cab. 2 (11m) Btg
21 Stang Ornamen Galvanis dia 2" Pj. 7 M + Klem Tiang Btg
22 Stang Ornamen Galvanis dia 2" Pj. 6 M + Klem Tiang Btg
23 Stang Ornamen Galvanis dia 2" Pj. 5 M + Klem Tiang Btg
24 Stang Ornamen Galvanis dia 2" Pj. 3 M + Klem Tiang 12
25 Stang Ornamen Galvanis dia 2" Pj. 2 M + Klem Tiang Btg
26 Box Panel PJU Uk. 60x90x30 Cm lengkap Time Swich Set
27 Box Panel PJU Uk. 50x45x25 Cm lengkap Time Swich Set
28 Box KWH Meter Uk. 35 x 50 x 25 cm Buah
29 Traffo HPL 400 Watt Buah
30 Traffo HPL 250 Watt Buah
31 Traffo HPL 125 Watt Buah
32 Traffo SOX 135 Watt Buah
33 Traffo SOX 180 Watt Buah
34 Traffo SON T 400 Watt Buah
35 Traffo SON T 250 Watt Buah
36 Traffo SON T 125 Watt Buah
37 Traffo SON T 70 Watt Buah
38 Traffo SON H 400 Watt Buah
39 Traffo SON H 250 Watt Buah
40 Traffo SON H 125 Watt Buah
41 Traffo SON H 70 Watt Buah
42 Traffo HPiT 400 Buah
43 Traffo Neon 40 Watt Buah
44 Traffo Neon 20 Watt Buah
45 Traffo Neon 10 Watt Buah
46 HPL 400 Watt Buah
47 HPL 250 Watt Buah
48 HPL 125 Watt Buah
49 SOX 135 Watt Buah
50 SOX 180 Watt Buah
51 MLL 160 Watt Buah
NO MATERIAL SATUAN

52 Bola SON T 1000 Watt Buah


53 Bola SON T 400 Watt Buah
54 Bola SON T 250 Watt Buah
55 Bola SON T 125 Watt Buah
56 Bola Lampu SON 70 Watt Buah
57 SON H 400 Watt Buah
58 SON H 250 Watt Buah
59 SON H 125 Watt Buah
60 SON H 70 Watt Buah
NO MATERIAL SATUAN

61 Bola Lampu HPIT 400 Watt Buah


62 HPIT 400 Watt Buah
63 Seri 200 Biji Kotak
64 Seri Kuning Kotak
65 Neon Sen Meter
66 Pijar 5 Watt Buah
67 Pijar 20 Watt Buah
68 Pijar 25 Watt Buah
69 Pijar 40 Watt Buah
70 Pijar 60 Watt Buah
71 Pijar 75 Watt Buah
72 Pijar 80 Watt Buah
73 Pijar 100 Watt Buah
74 Pijar 200 Watt Buah
75 Neon 40 Watt Buah
76 Neon 20 Watt Buah
77 Neon 10 Watt Buah
78 Lampu Ekorola TRX 800 - 20 watt (set) Set
79 Lampu Light Grick Buah
80 Lampu Genite 16 Watt Buah
81 Lampu XL 14 Watt Buah
82 Lampu Sorot 300 Watt Buah
83 Lampu Nepalos 25 Watt Buah
84 Lampu Superlox 25 Watt Buah
85 Lampu Superlox 40 Watt Buah
86 Lampu Fisikom 25 Watt Buah
87 Lampu Fisikom 23 Watt Buah
88 Lampu Fisikom 18 Watt Buah
89 Lampu Mercury 125 Watt Buah
90 Lampu Mercury 250 Watt Buah
91 Lampu Sunyco 45 Watt Buah
92 Lampu Matsuka 8 Watt Buah
93 Lampu Matsuka 14 Watt Buah
94 Lampu Matsuka 18 Watt Buah
95 Lampu Matsuka 20 Watt Buah
96 Lampu Matsuka 25 Watt Buah
97 Lampu Par 38 Watt Buah
98 Lampu Taman Buah
99 SL 15 Watt Buah
100 SL 18 Watt Buah
101 SL 25 Watt Buah
102 TL Rina 32 Watt Buah
NO MATERIAL SATUAN

103 Bola Essetial Buah


104 Bola Spot Light Buah
105 Bola Lampu Sorot 300 Watt Buah
106 Hologen 500 Watt Buah
107 Hologen 1.000 Watt Buah
108 Hologen 1.500 Watt Buah
109 NYY 1 x 1.5 mm Meter
110 NYY 1 x 2.5 mm Meter
111 NYY 1 x 4 mm Meter
112 NYY 1 x 6 mm Meter
113 NYY 2 mm Meter
114 NYY 2 x 2.5 mm Meter
115 NYY 2 x 4 mm Meter
116 NYY 2 x 6 mm Meter
117 NYY 2 x 10 mm Meter
118 NYY 3 x 4 mm Meter
119 NYY 4 x 2.5 mm Meter
120 NYY 4 x 4 mm Meter
121 NYY 4 x 6 mm Meter
122 NYY 4 x 10 mm Meter
123 NYY 4 x 16 mm Meter
124 NYY 4 x 25 mm Meter
125 NYY 4 x 35 mm Meter
126 NYY 4 x 50 mm Meter
127 NYY 4 x 70 mm Meter
128 NYYFYGBY 4 x 6 mm Meter
129 NYYFYGBY 4 x 10 mm Meter
130 NYN 2 x 2,5 mm Meter
131 NYN 3 x 1,5 mm Meter
132 NYN 3 x 2,5 mm Meter
133 NYA 1 x 1,5 mm Meter
134 NYA 1 x 2,5 mm Meter
135 NYA 1 x 4 mm Meter
136 NYA 1 x 6 mm Meter
137 NYA 2 x 2,5 mm Meter
138 NYA 2 x 4 mm Meter
139 NYA 2 x 30 mm Meter
140 NYA 4 x 6 mm Meter
141 NYA 1,5 mm Meter
142 NYA 4 mm Meter
143 NYA 10 mm Meter
144 NYA 16 mm Meter
NO MATERIAL SATUAN

145 NYF6BY 4 x 10 mm Meter


146 NYF6BY 4 x 16 mm Meter
147 NYF6BY 4 x 25 mm Meter
148 NYF6BY 4 x 35 mm Meter
149 NYF6BY 4 x 50 mm Meter
150 NYF6BY 4 x 70 mm Meter
151 NYM 4 mm Meter
152 NYM 3 x 4 mm Meter
153 NYM 2 x 2 mm Meter
154 NYM 2 x 4 mm Meter
NO MATERIAL SATUAN

155 NYM 2 x 2,5 mm Meter


156 NYM 2 x 1,5 mm Meter
157 NYM 3 x 1,5 mm Meter
158 NYM 3 x 2,5 mm Meter
159 NYM 3 x 10 mm Meter
160 NYM 4 x 2,5 mm Meter
161 NYM 4 x 4 mm Meter
162 NYMHYM 2 x 0,75 mm Meter
163 NYMHYM 2 x 1,5 mm Meter
164 Traffo SON T 1000 Watt Buah
165 Traffo SON T 400 Watt Buah
166 Traffo SON T 250 Watt Buah
167 Traffo SON T 70 Watt Buah
168 Kabel Snur Roll
169 Kabel Tester Meter
170 Kabel Box Meter
171 Kabel Mic Transparan Roll
172 Kabel 3 x 2,5 mm Meter
173 Kabel Antena Roll
174 Kabel H / M Meter
175 Kabel Transparan Meter
176 Kabel Telepon Meter
177 Kabel TC 2 x 10 mm Meter
178 Kabel TC 2 x 16 mm Meter
179 Box TL 20 Watt Buah
180 Box MCB 1 Group Buah
181 Cal Gulung Buah
182 Contactor 100 A Buah
183 Conector Buah
184 Dop 3" Buah
185 Esensial Buah
186 Fitting Gantung Buah
187 Fitting Duduk Buah
188 Fitting Atom Buah
189 Fitting Gantung E 27 Buah
190 Fitting Duduk E 27 Buah
191 Fitting Duduk E 40 Buah
192 Fitting Hologen Buah
193 Full Breket Buah
194 Gulung Spul Buah
195 Gulung Coil Contactor Buah
196 Isolasi Unibel Buah
NO MATERIAL SATUAN

197 Icnitor SN 58 Buah


198 Inector Buah
199 Ignator Buah
200 Indiktor Buah
201 Insuluk Buah
202 Kapasitor Buah
203 Kap Hijau E 27 Buah
204 Kap Hijau E 40 Buah
205 Kap Lampu Buah
206 Kap To2 Buah
207 Kop Skring Buah
208 Klem Tiang Buah
209 k. Skum 10-8 Buah
210 MCB 1.A Buah
211 MCB 2.A Buah
212 MCB 25 A Buah
213 MCB 63 A Buah
214 MCB 40 A Buah
215 MCB 45 A Buah
216 MCB 50 A Buah
217 MCB 10 A Buah
218 MCB 16 A Buah
219 MCB 6 A Buah
220 MCB 2 A Buah
221 MCB 4 A Buah
222 MCB 32 A Buah
223 MCB Box Buah
224 Multi Tester Buah
225 MC Se-3 N Buah
226 Macon Mec gmg-50 aC Buah
227 Magnetic Contactor 100 A Buah
228 NH Fuse 80 A Buah
229 Ornamen Pijar Buah
230 Ornamen Gantung Buah
231 Obeng Plus Buah
232 Obeng Minus Buah
233 Open Steker Buah
234 On - Off Buah
235 Pat 38 Buah
236 Solar Seal / Photo Seal Buah
237 Opstic 1/2" lengkap klem Batang
238 Pipa Paralon 1/2" Batang
NO MATERIAL SATUAN

239 Pipa L 1/2" Batang


240 Pipa Paralon 1' Batang
241 Pipa Paralon 3/4" Batang
242 Pipa Paralon 3' Batang
243 Pipa PVC 1,5" Batang
244 Pipa PVC Galvanis 1,5" Batang
245 Pipa Besi Batang
246 Pipa Galvanis Batang
247 Pipa ornamen dia 2" x 2m Batang
248 Pipa ornamen dia 2" x 3m lengkap klem Batang
249 Pipa ornamen dia 2" x 6m lengkap klem Batang
NO MATERIAL SATUAN

250 Pipa ornamen dia 2" x 7m lengkap klem Batang


251 Pondasi tiang lampu oktagonal (11 meter) Unit
252 Pres Conector Buah
253 Rangka Ring 32 Watt Buah
254 Rel MCB Buah
255 Roset Telpon Buah
256 Saklar Double Buah
257 Saklar Engkel Buah
258 Saklar Tripel Buah
259 Spul Contactor Buah
260 Sekring 63 A Buah
261 Solder Pistol Buah
262 Solder Buah
263 Solar Seal / Photo Seal Buah
264 Stop Kontak Buah
265 Steker Arde Buah
266 Steker T Buah
267 Steker PH Buah
268 Sadel No. 6 Bungkus
269 Sadel No. 8 Bungkus
270 Sadel No. 9 Bungkus
271 Sadel No. 10 Bungkus
272 Sadel No. 12 Bungkus
273 Sadel No. 14 Bungkus
274 Sadel No. 19 Bungkus
275 Sadel No. 22 Bungkus
276 Skun RS-16 Buah
277 Stater Buah
278 Ston 63 A Buah
279 Stost 40 A + Ip Buah
280 Stost 32 A + Ip Buah
281 Tedus Hitam Buah
282 Tali Tester Buah
283 Tang Amper Buah
284 Tang Buaya Buah
285 Tang Potong Buah
286 Tang Kombinasi Buah
287 Tang Jepit Buah
288 Tang Skun Buah
289 Time Swicht Theben Buah
290 Taping Buah
291 Taping Conector 1 baut Buah
292 Taping Conector 2 baut Buah
293 Tespen Buah
294 Timah Solder Buah
NO MATERIAL SATUAN

295 Terminal 25 ml Buah


296 Tolkit Buah
297 Wedge Klem Buah
298 Wide Klem Buah
299 WD 40 Buah
300 Klem Tiang uk. 5" s/d 8" x 2" Set

M. ALAT-ALAT PEMADAM KEBAKARAN


1 Helm pemadam kebakaran Buah
2 Baju tahan panas Buah
3 Baret lengkap Buah
4 Celana tahan api Buah
5 Sepatu pemadam Pasang
6 Sarung tangan Pasang
7 Chainsaw Buah
8 Dahrem Buah
9 Handy Talky Buah
10 Tali pengaman Buah
11 Kapak Pemadam Buah
12 Kopel rem Buah
13 Y Connection 1.5" Buah
14 Y Connection 2.5" Buah
15 Pilar Hydrant Unit
16 Nozzle multi spray jet 1.5' Buah
17 Nozzle multi spray jet 2.5' Buah
18 Selang pemadan uk. 1.5 " x 20m
Roll
+ Machino Coupling
19 Selang pemadan uk. 2.5 " x 20m
Roll
+ Machino Coupling
20 Tac stick (alat pendeteksi kebocoran listrik) Buah
21 Hydrant tester (alat ukur hydrant)
22 Tabung pernapasan
Unit
(continued breathing aparatus)
23 Floating Pump (pompa apung) Unit
24 Hydrant Pillar Two Way 2,5" Machino Unit
25 Tabung Apar 3 Kg Unit
26 Tabung Apar 6 Kg Unit
27 Sepeda Motor 110 cc Unit
28 Sepeda Motor (Modifikasi) Unit
29 Repiter Unit
30 Mesin DF (Daug Feng) Unit
31 Pump Niagara Unit

WAKIL WALIKOTA
NO MATERIAL SATUAN

Untuk salinan sesuai dengan bunyi aslinya


SEKRETARIS DAERAH KOTA PONTIANAK

Ir. H. TONI HERIANTO, MT


Pembina Utama Muda
NIP. 19541129 198003 1 016
KEPUTUSAN WALIKOTA PONTIANAK
NOMOR : …………………... TAHUN 2010

TENTANG
SATUAN BAHAN, UPAH DAN ANALISA
TERDIRI DARI ANALISA E DAN ANALISA
UNG DAN PERUMAHAN (ABK-SNI) KOTA PONTIANAK
UN ANGGARAN 2010

anuari s/d Desember 2010 )

HARGA

HARGA TERMASUK
KEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD)
(Rp) (Rp)

6,050.00 66,550.00
6,050.00 66,550.00
6,050.00 66,550.00
5,500.00 60,500.00
4,950.00 54,450.00
4,400.00 48,400.00
4,950.00 54,450.00
4,400.00 48,400.00
4,950.00 54,450.00

HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.101 192,500.00
- 215,050.00
- 230,230.00
M.020 246,070.00
M.022 271,060.00
M.023 290,700.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.024 327,030.00
M.025 373,580.00
- 394,900.00
M.026 394,900.00
- 371,360.00
- 9,900.00
M.040 58,370.00
M.080 70,400.00
- 1,400.00
M.050.a 115,060.00
M.050 220,000.00
- 2,200.00
- 3,630.00
- 2,530.00
- 990.00
- 2,530.00
- 2,310.00
- 3,300.00
- 26,400.00
- 50,120.00
- 40,030.00
- 54,450.00
- 64,130.00
- 71,390.00
- 96,250.00
- 98,450.00
- 277,200.00
- 189,420.00
- 453,750.00
- 275,000.00
- 242,000.00
- 46,750.00
- 50,380.00
- 54,890.00
- 8,250.00
- 792,000.00
- 830,500.00
- 880,000.00
- 1,017,500.00
- 1,094,500.00
- 44,000.00
- 11,550.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 1,155,000.00
- 1,485,000.00
- 990,000.00
- 1,105,500.00
- 880,000.00
- 1,122,000.00
- 138,050.00
- 55,000.00
- 3,850.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 9,736,320.00
- 11,463,540.00
- 9,063,230.00
M.181.a 9,350,550.00
M.181.b 7,903,940.00
- 8,116,350.00
- 7,370,770.00
- 8,934,750.00
- 11,892,210.00
- 10,771,200.00
- 10,771,200.00
- 9,453,120.00
M.181.e 16,958,370.00
M.181.d 15,074,070.00
M.181.f 6,660,170.00
M.181.g 11,297,220.00
- 4,630,120.00
- 6,033,170.00
- 11,550,000.00
- 82,500.00
M.181.h 2,194,720.00
M.181.i 3,293,620.00
- 3,724,160.00
- 3,168,550.00
- 2,764,960.00
- 1,883,750.00
- 3,053,270.00
- 3,244,010.00
- 3,949,990.00
- 4,109,820.00
- 2,520,870.00
- 4,947,360.00
- 962,500.00
- 2,046,110.00
M.181.j 4,541,790.00
M.181.k 6,331,160.00
- 9,052,120.00
- 7,562,500.00
M.181.l 1,323,520.00
- 604,780.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 19,360.00
- 20,680.00
- 5,630.00
- 10,450.00
- 66,000.00
- 82,500.00
- 181,500.00
- 16,500.00

- 2,310.00
- 27,940.00
- 42,130.00
- 29,480.00
- 33,000.00
- 36,520.00
- 40,260.00
- 80,080.00
- 42,900.00
- 27,940.00
- 39,160.00
M.090.f 22,990.00
- 32,450.00
- 56,540.00
- 30,910.00
- 44,220.00
- 55,820.00
- 20,400.00
- 137,500.00
- 11,660.00
- 20,350.00
- 44,000.00
- 25,300.00
- 17,710.00
M.090.e 49,500.00
M.090.g 36,520.00
M.090.h 79,200.00
- 34,100.00

M.167 15,510.00
- 17,710.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.168 18,700.00
- 20,900.00
- 26,620.00
M.163 8,250.00
- 11,550.00
- 38,500.00
- 445,500.00
- 17,930.00
- 18,590.00
- 18,590.00
- 5,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 110,000.00
- 27,500.00
- 13,750.00
- 148,610.00
- 121,880.00
- 191,510.00
- 269,830.00
- 312,730.00
- 384,450.00
- 614,350.00
- 437,580.00
- 550,000.00
- 82,500.00
- 105,600.00
- 2,392,500.00
- 253,000.00
- 165,000.00
- 2,090,000.00

- 302,500.00
- 14,850.00
- 16,500.00
- 110,000.00
- 24,750.00
- 33,000.00
- 20,350.00
- 11,550.00
- 184,250.00
- 118,250.00
- 179,020.00
- 86,900.00
- 107,250.00
- 123,750.00
- 22,000.00
M.166.a 24,530.00
M.166.b 20,900.00
- 27,500.00
M.166.c 27,500.00
- 28,870.00
- 28,870.00
- 38,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 66,000.00
- 330.00
- 11,000.00

- 5,500.00
- 55,000.00
- 71,500.00
- 69,630.00
- 69,630.00
- 67,320.00
- 88,880.00
- 88,880.00
- 93,500.00
- 116,930.00
- 104,530.00
- 117,420.00
- 71,500.00
- 88,000.00
- 85,360.00
- 101,200.00
- 114,400.00
- 128,700.00
- 71,390.00
- 51,370.00
- 52,800.00
- 71,500.00
- 20,900.00
- 60,500.00
- 114,120.00
- 100,370.00
- 127,870.00
- 114,120.00
- 130,900.00
- 55,000.00

- 109,450.00
- 422,400.00
- 146,300.00
- 156,750.00
- 1,045,000.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 111,650.00
- 214,500.00
- 225,500.00
- 167,200.00

- 60,500.00
- 133,100.00
- 165,000.00
- 187,000.00
- 222,200.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 109,340.00
- 64,900.00
- 67,100.00

- 1,705,000.00
- 2,145,000.00
- 2,343,000.00
- 204,600.00
- 137,500.00
- 38,500.00
- 17,820.00
- 27,670.00
- 40,700.00
- 61,820.00
- 117,150.00
- 154,000.00

M.183 4,500.00
- 5,750.00
M.184 5,600.00
M.185 24,200.00
- 42,400.00
M.064 5,100.00
- 6,100.00
- 8,300.00
M.170 57,000.00
- 62,500.00
- 150,000.00
- 63,300.00

13,167,000.00
- 5,458,530.00
- 3,724,980.00
- 5,105,100.00
- 4,274,980.00
- 4,939,000.00
- 544,500.00
- 6,675,900.00
- 5,563,250.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 3,599,750.00
- 7,754,900.00
- 6,805,880.00
- 7,237,010.00
- 7,601,000.00
- 67,217,150.00
- 80,659,700.00
- 10,838,520.00
- 12,362,130.00
- 10,838,300.00
- 11,388,300.00
- 983,010.00
- 982,980.00
- 915,200.00
- 682,000.00
- 517,000.00
- 4,664,000.00
- 3,376,170.00
- 797,500.00
- 249,700.00
- 202,030.00
- 124,850.00
- 842,870.00
- 842,870.00
- 459,430.00
- 374,360.00
- 248,320.00
- 144,550.00
- 409,290.00
- 280,950.00
- 248,320.00
- 148,220.00
- 270,500.00
- 19,610.00
- 16,360.00
- 14,390.00
- 202,950.00
- 148,310.00
- 70,210.00
- 485,550.00
- 485,550.00
- 70,210.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 742,500.00
- 336,600.00
- 324,500.00
- 248,320.00
- 168,520.00
- 280,950.00
- 280,950.00
- 248,320.00
- 140,430.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 336,600.00
- 324,610.00
- 55,450.00
- 55,450.00
- 41,620.00
- 2,100.00
- 3,480.00
- 3,480.00
- 3,480.00
- 4,950.00
- 4,950.00
- 3,940.00
- 6,230.00
- 13,840.00
- 13,100.00
- 9,070.00
- 5,220.00
- 538,080.00
- 131,810.00
- 41,610.00
- 34,650.00
- 137,500.00
- 34,650.00
- 5,500.00
- 6,230.00
- 34,650.00
- 34,650.00
- 27,770.00
- 70,210.00
- 148,220.00
- 83,230.00
- 20,800.00
- 22,180.00
- 31,900.00
- 37,490.00
- 38,860.00
- 51,330.00
- 34,650.00
- 115,500.00
- 44,990.00
- 58,190.00
- 27,680.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 33,360.00
- 51,970.00
- 137,500.00
- 40,240.00
- 79,100.00
- 90,100.00
- 2,970.00
- 4,620.00
- 7,260.00
- 11,220.00
- 6,140.00
- 12,210.00
- 17,500.00
- 16,610.00
- 21,900.00
- 23,740.00
- 23,430.00
- 34,650.00
- 56,260.00
- 76,560.00
- 65,900.00
- 273,350.00
- 305,250.00
- 374,550.00
- 134,560.00
- 86,680.00
- 127,930.00
- 6,500.00
- 5,950.00
- 7,880.00
- 2,970.00
- 4,620.00
- 7,260.00
- 11,220.00
- 12,210.00
- 17,600.00
- 12,280.00
- 22,820.00
- 1,370.00
- 3,570.00
- 8,700.00
- 2,380.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 60,500.00
- 88,270.00
- 122,100.00
- 155,370.00
- 199,740.00
- 271,970.00
- 3,570.00
- 19,700.00
- 5,950.00
- 14,660.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 10,170.00
- 4,400.00
- 5,500.00
- 7,880.00
- 27,680.00
- 10,080.00
- 25,480.00
- 3,110.00
- 5,310.00
- 929,500.00
- 551,320.00
- 449,240.00
- 173,470.00
- 55,450.00
- 27,680.00
- 55,450.00
- 180,300.00
- 7,880.00
- 34,650.00
- 2,010.00
- 2,750.00
- 1,650.00
- 7,090.00
- 9,900.00
- 8,250.00
- 4,120.00
- 55,450.00
- 1,106,050.00
- 7,970.00
- 6,960.00
- 34,650.00
- 1,460.00
- 3,480.00
- 27,770.00
- 17,440.00
- 17,440.00
- 22,110.00
- 27,770.00
- 12,500.00
- 69,390.00
- 69,390.00
- 4,950.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 99,880.00
- 83,230.00
- 55,500.00
- 130,160.00
- 320.00
- 156,200.00
- 27,500.00
- 44,000.00
- 97,070.00
- 97,070.00
- 4,190.00
- 11,130.00
- 840.00
- 13,880.00
- 13,880.00
- 13,880.00
- 124,850.00
- 52,700.00
- 52,700.00
- 235,620.00
- 68,000.00
- 34,650.00
- 34,650.00
- 13,880.00
- 34,650.00
- 34,650.00
- 3,480.00
- 62,420.00
- 911,620.00
- 499,490.00
- 1,327,260.00
- 25,000.00
- 48,560.00
- 48,560.00
- 19,610.00
- 19,610.00
- 2,090.00
- 6,270.00
- 52,020.00
- 124,850.00
- 229,070.00
- 7,650.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 2,090.00
- 9,020.00
- 8,340.00
- 16,680.00
- 43,490.00
- 149,990.00
- 83,230.00
- 97,120.00
- 438,530.00
- 569,430.00
- 1,145,370.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 1,276,270.00
- 1,439,900.00
- 2,810.00
- 13,840.00
- 20,800.00
- 4,900.00
- 6,280.00
- 4,300.00
- 16,680.00
- 55,450.00
- 9,020.00
- 305,250.00
- 20,800.00
- 124,850.00
- 4,190.00
- 8,340.00
- 9,710.00
- 2,810.00
- 980.00
- 1,300.00
- 1,440.00
- 3,850.00
- 4,950.00
- 2,810.00
- 4,190.00
- 8,370.00
- 980.00
- 2,810.00
- 124,880.00
- 52,750.00
- 34,680.00
- 710.00
- 20,800.00
- 901,900.00
- 27,750.00
- 27,750.00
- 27,750.00
- 27,750.00
- 277,500.00
- 592,180.00
- 457,870.00
- 10,690.00
- 17,440.00
- 6,920.00
- 20,800.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 34,690.00
- 62,420.00
- 4,190.00
- 6,420.00
- 34,690.00
- 192,500.00

- 630,850.00
- 7,150,000.00
- 55,000.00
- 6,050,000.00
- 550,000.00
- 366,850.00
- 8,800,000.00
- 66,000.00
- 2,750,000.00
- 165,000.00
- 330,000.00
- 49,500.00
- 4,950,000.00
- 5,500,000.00
- 5,390,000.00
- 8,250,000.00
- 8,800,000.00

- 3,025,000.00

- 3,245,000.00

- 10,560,000.00
- 9,680,000.00

- 17,875,000.00

- 91,208,370.00
- 5,225,000.00
- 733,330.00
- 1,100,000.00
- 11,000,000.00
- 17,416,660.00
- 38,700,470.00
- 5,500,000.00
- 9,533,330.00

WAKIL WALIKOTA PONTIANAK


HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

TERTANDA

PARYADI, S.Hut

salinan sesuai dengan bunyi aslinya


TARIS DAERAH KOTA PONTIANAK

Ir. H. TONI HERIANTO, MT


Pembina Utama Muda
NIP. 19541129 198003 1 016
K. PEKERJAAN BESI DAN ALUMINIUM (P. BA.)
Memasang 1m kusen pintu alluminium (P. BA 05)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 61,665.00 0.043
2 Tukang Besi kontruksi OH 61,665.00 0.043
3 Kepala Tukang OH 61,665.00 0.0043
4 Mandor OH 61,665.00 0.0021
Jumlah
B BAHAN
1 Profil alluminium m' 45,000.00 1.100
2 Skrup fixer Buah 2,007.97 2.000
3 Sealant Tube 100,000.00 0.060
Jumlah
C Jumlah A + B
D Harga Satuan 75%
Acuan : SNI DT 91-0014-2007

Pekerjaan Besi & Aluminium 320


A.)

BIAYA
SATUAN
( Rp. )
6

2,651.60
2,651.60
265.16
129.50
5,697.85

49,500.00
0.00
0.00
49,500.00
55,197.85
41,398.38

Pekerjaan Besi & Aluminium 321


Analisa Harga Satuan Pekerjaan
Pekerjaan :
Lokasi :
Tahun :

Harga Satuan (Rp)


Total Harga Satuan
No Jenis Pekerjaan Sat Indeks
(Rp)
Bahan Upah
I PEKERJAAN PERSIAPAN
6.8 A. Pembersihan Lahan (m²)
SNI 03-2835-2002 Tenaga
Pekerja Oh 0.100 36,000.00 3,600.00
Mandor Oh 0.050 40,000.00 2,000.00
Sub Total 5,600.00
6.1 B. Pemasangan Pagar Sementara dari Kayu tinggi 2 m (m¹)
SNI 03-2835-2002 Bahan
Dolken Kayu Ø 8-10/400 cm Btg 1.250 25,000.00 31,250.00
Semen Portland Kg 2.500 1,050.00 2,625.00
Pasir Beton M³ 0.005 125,000.00 625.00
Koral Beton M³ 0.009 135,000.00 1,215.00
Kayu 5/7 M³ 0.072 1,700,000.00 122,400.00
Paku Biasa 2"-5" Kg 0.060 10,000.00 600.00
Residu Lt 0.400 11,000.00 4,400.00
Tenaga
Tukang Kayu Oh 0.200 47,500.00 9,500.00
Pekerja Oh 0.400 36,000.00 14,400.00
Kepala Tukang Oh 0.020 45,000.00 900.00
Mandor Oh 0.020 40,000.00 800.00
Sub Total 188,715.00
6.4 C. Memasang Bouwplank (m¹)
SNI 03-2835-2002 Bahan
Kayu 5/7 M³ 0.012 1,700,000.00 20,400.00
Paku Biasa 2"-5" Kg 0.020 10,000.00 200.00
Kayu Papan Bengkirai 3/20 M³ 0.007 3,541,666.00 24,791.66
Tenaga
Tukang Kayu Oh 0.100 47,500.00 4,750.00
Pekerja Oh 0.100 36,000.00 3,600.00
Kepala Tukang Oh 0.010 45,000.00 450.00
Mandor Oh 0.005 40,000.00 200.00
Sub Total 54,391.66
ALS D. Memasang Papan Nama Proyek 80x120 cm (Bh)
Bahan
Kayu Meranti Btg 0.035 1,687,000.00 59,045.00
Paku Biasa 2"-5" Kg 0.600 10,000.00 6,000.00
Seng Lembaran 90 cm M¹ 1.400 27,000.00 37,800.00
Cat kayu Kg 1.500 38,000.00 57,000.00
Semen Portland Kg 16.800 1,050.00 17,640.00
Pasir Beton M³ 0.027 125,000.00 3,375.00
Koral Beton M³ 0.041 135,000.00 5,535.00
Tenaga
Tukang Kayu Oh 1.000 47,500.00 47,500.00
Tukang Batu Oh 0.018 42,500.00 765.00
Tukang Cat Oh 1.000 42,500.00 42,500.00
Pekerja Oh 2.100 36,000.00 75,600.00
Mandor Oh 1.005 40,000.00 40,200.00
Sub Total 392,960.00
6.5 E. Membuat direksi keet & Gudang Sementara (m²)
SNI 03-2835-2002 Bahan
Dolken Kayu Ø 8-10/400 cm Btg 1.250 25,000.00 31,250.00
Kayu 5/7 M³ 0.180 1,700,000.00 306,000.00
Paku Biasa 2"-5" Kg 0.850 10,000.00 8,500.00
Besi Strip Kg 1.100 11,000.00 12,100.00
Semen Portland Kg 35.000 1,050.00 36,750.00
Pasir Pasang M³ 0.150 125,000.00 18,750.00
Pasir Beton M³ 0.100 125,000.00 12,500.00
Koral Beton M³ 0.150 135,000.00 20,250.00
Bata Merah Bh 30.000 500.00 15,000.00
Seng Plat Lbr 0.250 27,000.00 6,750.00
Jendela Nako Bh 2.0000 12,500.00 25,000.00
Kaca Polos 3 mm M² 0.080 50,000.00 4,000.00
Kunci Tanam Bh 0.150 25,000.00 3,750.00
Plywood 4 mm Lbr 0.060 50,000.00 3,000.00
Tenaga
Tukang Kayu Oh 2.000 47,500.00 95,000.00
Tukang Batu Oh 1.000 42,500.00 42,500.00
Pekerja Oh 2.000 36,000.00 72,000.00
Kepala Tukang Oh 0.800 45,000.00 36,000.00
Mandor Oh 0.050 40,000.00 2,000.00
Sub Total 751,100.00

II PEKERJAAN TANAH
6.1 A. Galian Tanah Biasa sedalam 1 m (m³)
SNI 03-2835-2002 Tenaga
Pekerja Oh 0.400 36,000.00 14,400.00
Mandor Oh 0.040 40,000.00 1,600.00
Sub Total 16,000.00
6.9 B. Urugan Kembali (m³)
SNI 03-2835-2002 Tenaga
Pekerja Oh 0.192 36,000.00 6,912.00
Mandor Oh 0.019 40,000.00 760.00
Sub Total 7,672.00
6.11 C. Urugan Pasir Bawah Pondasi (m³)
SNI 03-2835-2002 Bahan
Pasir Urug M³ 1.200 100,000.00 120,000.00
Tenaga
Pekerja Oh 0.300 36,000.00 10,800.00
Mandor Oh 0.010 40,000.00 400.00
Sub Total 131,200.00

III PEKERJAAN PONDASI


6.6 D. Pasangan Pondasi Batu Kali 1 Pc: 5 Ps (m³)
SNI 03-2835-2002 Bahan
Batu Belah 15/20 cm M³ 1.100 85,000.00 93,500.00
Semen Portland Kg 136.000 1,050.00 142,800.00
Pasir Pasang M³ 0.544 125,000.00 68,000.00
Tenaga
Pekerja Oh 1.500 36,000.00 54,000.00
Tukang Batu Oh 0.600 42,500.00 25,500.00
Kepala Tukang Oh 0.060 45,000.00 2,700.00
Mandor Oh 0.075 40,000.00 3,000.00
Sub Total 389,500.00

IV PEKERJAAN DINDING
6.11 A. Pasangan Tembok ½ Bata 1Pc:4Ps (Trasraam) (m²)
SNI 03-2835-2002 Bahan
Bata Merah 5 X 11 X 22 cm Bh 70.000 500.00 35,000.00
Semen Portland Kg 11.500 1,050.00 12,075.00
Pasir Pasang M³ 0.043 125,000.00 5,375.00
Tenaga
Pekerja Oh 0.320 36,000.00 11,520.00
Tukang Batu Oh 0.100 42,500.00 4,250.00
Kepala Tukang Oh 0.010 45,000.00 450.00
Mandor Oh 0.015 40,000.00 600.00
Sub Total 69,270.00
6.15 B. Pasangan Tembok ½ Bata 1Pc:3Kp:10Ps (m²)
SNI 03-2835-2002 Bahan
Bata Merah 5 X 11 X 22 cm Bh 70.000 500.00 35,000.00
Semen Portland Kg 4.500 1,050.00 4,725.00
Pasir Pasang M³ 0.050 125,000.00 6,250.00
Kapur Padam M³ 0.015 45,000.00 675.00
Tenaga
Pekerja Oh 0.320 36,000.00 11,520.00
Tukang Batu Oh 0.100 42,500.00 4,250.00
Kepala Tukang Oh 0.010 45,000.00 450.00
Mandor Oh 0.015 40,000.00 600.00
Sub Total 63,470.00

V PEKERJAAN PLESTERAN DINDING


6.14 A. Plesteran Dinding 1Pc:3Ps (m²) tebal 20 mm
SNI 03-2835-2002 Bahan
Semen Portland Kg 10.800 1,050.00 11,340.00
Pasir Pasang M³ 0.026 125,000.00 3,250.00
Tenaga
Pekerja Oh 0.250 36,000.00 9,000.00
Tukang Batu Oh 0.200 42,500.00 8,500.00
Kepala Tukang Oh 0.020 45,000.00 900.00
Mandor Oh 0.013 40,000.00 500.00
Sub Total 33,490.00
6.9 B. Plesteran Dinding 1Pc:3Kp:10Ps (m²) tebal 15 mm
SNI 03-2835-2002 Bahan
Semen Portland Kg 1.840 1,050.00 1,932.00
Kapur Padam M³ 0.006 45,000.00 270.00
Pasir Pasang M³ 0.014 125,000.00 1,750.00
Tenaga
Pekerja Oh 0.200 36,000.00 7,200.00
Tukang Batu Oh 0.150 42,500.00 6,375.00
Kepala Tukang Oh 0.015 45,000.00 675.00
Mandor Oh 0.010 40,000.00 400.00
Sub Total 18,602.00

VI PEKERJAAN KAYU
6.1 A. Pasang Kusen Pintu dan Jendela Kayu Jati (m³)
SNI 03-2835-2002 Bahan
Kayu jati, balok M³ 1.100 15,000,000.00 16,500,000.00
Tenaga
Pekerja Oh 6.000 36,000.00 216,000.00
Tukang Kayu Oh 20.000 47,500.00 950,000.00
Kepala Tukang Oh 2.000 45,000.00 90,000.00
Mandor Oh 0.300 40,000.00 12,000.00
Sub Total 17,768,000.00
6.7 B. Pasang Pintu Panel Kayu Jati (m²)
SNI 03-2835-2002 Bahan
Kayu Jati, papan M³ 0.040 18,000,000.00 720,000.00
Tenaga
Pekerja Oh 1.000 36,000.00 36,000.00
Tukang Kayu Oh 2.500 47,500.00 118,750.00
Kepala Tukang Oh 0.250 45,000.00 11,250.00
Mandor Oh 0.050 40,000.00 2,000.00
Sub Total 888,000.00
ALS C. Pasang Nook, Gording, Murplat, Nook Kayu Bengkirai (m³)
Bahan
Kayu Bengkirai, balok M³ 1.100 8,500,000.00 9,350,000.00
Tenaga
Pekerja Oh 2.000 36,000.00 72,000.00
Tukang Kayu Oh 8.000 47,500.00 380,000.00
Kepala Tukang Oh 1.200 45,000.00 54,000.00
Mandor Oh 0.200 40,000.00 8,000.00
Sub Total 9,864,000.00
6.35 D. Pasang Kaso+Reng Genteng Beton Kayu Borneo (m²)
SNI 03-2835-2002 Bahan
Kayu Borneo, balok M³ 0.014 8,500,000.00 119,000.00
Paku Biasa 2"-5" Kg 0.150 10,000.00 1,500.00
Tenaga
Pekerja Oh 0.100 36,000.00 3,600.00
Tukang Kayu Oh 0.100 47,500.00 4,750.00
Kepala Tukang Oh 0.010 45,000.00 450.00
Mandor Oh 0.005 40,000.00 200.00
Sub Total 129,500.00
6.53 E. Pasang Listplank, Reuter 2X (2X20) cm, kayu borneo (m³)
SNI 03-2835-2002 Bahan
Kayu Borneo,Papan M³ 0.009 10,000,000.00 88,000.00
Paku Biasa 2"-5" Kg 0.060 10,000.00 600.00
Tenaga
Pekerja Oh 0.100 36,000.00 3,600.00
Tukang Kayu Oh 0.100 47,500.00 4,750.00
Kepala Tukang Oh 0.010 45,000.00 450.00
Mandor Oh 0.050 40,000.00 2,000.00
Sub Total 99,400.00
6.40 F. Pasang Rangka Langit-langit 1X1 m Kayu Borneo (m²)
SNI 03-2835-2002 Bahan
Kayu borneo, balok M³ 0.012 8,500,000.00 102,000.00
Paku biasa 2"-5" Kg 0.100 10,000.00 1,000.00
Tenaga
Pekerja Oh 0.150 36,000.00 5,400.00
Tukang Kayu Oh 0.250 47,500.00 11,875.00
Kepala Tukang Oh 0.025 45,000.00 1,125.00
Mandor Oh 0.075 40,000.00 3,000.00
Sub Total 124,400.00

VII PEKERJAAN BETON


6.39 A. Membuat sloof Beton Bertulang (200Kg besi+bekisting) (m³)
SNI 03-2835-2002 Bahan
Kayu Terentang M³ 0.270 2,000,000.00 540,000.00
Paku Biasa 2"-5" Kg 2.000 10,000.00 20,000.00
Minyak Bekisting Lt 0.600 10,000.00 6,000.00
Besi Beton polos Kg 200.000 12,000.00 2,400,000.00
Kawat Beton Kg 3.000 13,000.00 39,000.00
Semen Portland Kg 323.000 1,050.00 339,150.00
Pasir Beton M³ 0.520 125,000.00 65,000.00
Koral Beton M³ 0.780 135,000.00 105,300.00
Tenaga
Pekerja Oh 4.850 36,000.00 174,600.00
Tukang Batu Oh 0.350 42,500.00 14,875.00
Tukang Kayu Oh 1.560 47,500.00 74,100.00
Tukang Besi Oh 1.400 45,000.00 63,000.00
Kepala Tukang Oh 0.331 45,000.00 14,895.00
Mandor Oh 0.170 40,000.00 6,800.00
Sub Total 3,862,720.00
6.40 B. Membuat Kolom Beton Bertulang (300Kg besi+bekisting) (m³)
SNI 03-2835-2002 Bahan
Kayu Terentang M³ 0.400 2,000,000.00 800,000.00
Paku Biasa 2"-5" Kg 4.000 10,000.00 40,000.00
Minyak Bekisting Lt 2.000 10,000.00 20,000.00
Besi Beton polos Kg 300.000 12,000.00 3,600,000.00
Kawat Beton Kg 4.500 13,000.00 58,500.00
Semen Portland Kg 323.000 1,050.00 339,150.00
Pasir Beton M³ 0.520 125,000.00 65,000.00
Koral Beton M³ 0.780 135,000.00 105,300.00
Kayu Borneo Balok M³ 0.150 8,500,000.00 1,275,000.00
Plywood 9 mm Lbr 3.500 95,000.00 332,500.00
Dolken Kayu Ø 8-10/400 cm Btg 20.000 25,000.00 500,000.00
Tenaga
Pekerja Oh 7.300 36,000.00 262,800.00
Tukang Batu Oh 0.350 42,500.00 14,875.00
Tukang Kayu Oh 3.300 47,500.00 156,750.00
Tukang Besi Oh 2.100 45,000.00 94,500.00
Kepala Tukang Oh 0.570 45,000.00 25,650.00
Mandor Oh 0.250 40,000.00 10,000.00
Sub Total 7,700,025.00
6.46 C. Membuat Ring Balok Beton Bertulang (10X15cm) (m³)
SNI 03-2835-2002 Bahan
Kayu Albasiah M³ 0.003 3,000,000.00 9,000.00
Paku Biasa 2"-5" Kg 0.020 10,000.00 200.00
Besi Beton polos Kg 3.600 13,000.00 46,800.00
Kawat Beton Kg 0.050 13,000.00 650.00
Semen Portland Kg 5.500 1,050.00 5,775.00
Pasir Beton M³ 0.009 125,000.00 1,125.00
Koral Beton M³ 0.015 135,000.00 2,025.00
Tenaga
Pekerja Oh 0.100 36,000.00 3,600.00
Tukang Batu Oh 0.033 42,500.00 1,402.50
Tukang Kayu Oh 0.033 47,500.00 1,567.50
Tukang Besi Oh 0.033 45,000.00 1,485.00
Kepala Tukang Oh 0.010 45,000.00 450.00
Mandor Oh 0.005 40,000.00 200.00
Sub Total 74,280.00
6.46 D. Membuat Kuda-Kuda Beton Bertulang (10X15cm) (m³)
SNI 03-2835-2002 Bahan
Kayu Albasiah M³ 0.003 3,000,000.00 9,000.00
Paku Biasa 2"-5" Kg 0.020 10,000.00 200.00
Besi Beton polos Lt 3.600 13,000.00 46,800.00
Kawat Beton Kg 0.050 13,000.00 650.00
Semen Portland Kg 5.500 1,050.00 5,775.00
Pasir Beton Kg 0.009 125,000.00 1,125.00
Koral Beton M³ 0.015 135,000.00 2,025.00
Tenaga
Pekerja Oh 0.100 36,000.00 3,600.00
Tukang Batu Oh 0.033 42,500.00 1,402.50
Tukang Kayu Oh 0.033 47,500.00 1,567.50
Tukang Besi Oh 0.033 45,000.00 1,485.00
Kepala Tukang Oh 0.010 45,000.00 450.00
Mandor Oh 0.005 40,000.00 200.00
Sub Total 74,280.00
6.5 E. Membuat Plat Beton 1Pc:2Ps:3Kr (m³)
SNI 03-2835-2002 Bahan
Semen Portland Kg 232.000 1,050.00 243,600.00
Pasir Beton M³ 0.520 125,000.00 65,000.00
Koral Beton M³ 0.780 135,000.00 105,300.00
Tenaga
Pekerja Oh 1.650 36,000.00 59,400.00
Tukang Batu Oh 0.250 42,500.00 10,625.00
Kepala Tukang Oh 0.025 45,000.00 1,125.00
Mandor Oh 0.080 40,000.00 3,200.00
Sub Total 488,250.00
6.25 F. Pembesian Besi Polos dan Ulir plat beton(Kg)
SNI 03-2835-2002 Bahan
Besi Beton (Polos/Ulir) Kg 1.050 12,000.00 12,600.00
Kawat Beton Kg 0.015 13,000.00 195.00
Tenaga
Pekerja Oh 0.007 36,000.00 252.00
Tukang Besi Oh 0.007 45,000.00 315.00
Kepala Tukang Oh 0.001 45,000.00 31.50
Mandor Oh 0.000 40,000.00 12.00
Sub Total 13,405.50
6.32 G. Pasang Bekisting untuk Plat Beton (m²)
SNI 03-2835-2002 Bahan
Kayu Terentang M³ 0.040 2,000,000.00 80,000.00
Paku Biasa 2"-5" Kg 0.400 10,000.00 4,000.00
Minyak Bekisting Lt 0.200 10,000.00 2,000.00
Balok Kayu borneo M³ 0.015 8,500,000.00 127,500.00
Plywood tebal 9 mm Lbr 0.350 95,000.00 33,250.00
Dolken Kayu galam Ø 8-10/4 m Btg 6.000 25,000.00 150,000.00
Tenaga
Pekerja Oh 0.320 36,000.00 11,520.00
Tukang kayu Oh 0.330 47,500.00 15,675.00
Kepala Tukang Oh 0.033 45,000.00 1,485.00
Mandor Oh 0.006 40,000.00 240.00
Sub Total 425,670.00
VIII PEKERJAAN PENUTUP ATAP
6.4 A. Pasang Genteng Bubung Palentong (m¹)
SNI 03-2835-2002 Bahan
Genteng Bubung Palentong Bh 5.000 7,500.00 37,500.00
Semen Portland Kg 8.000 1,050.00 8,400.00
Pasir Pasang M3 0.032 125,000.00 4,000.00
Tenaga
Pekerja Oh 0.400 36,000.00 14,400.00
Tukang Kayu Oh 0.200 47,500.00 9,500.00
Kepala Tukang Oh 0.020 45,000.00 900.00
Mandor Oh 0.002 40,000.00 80.00
Sub Total 74,780.00
6.30 B. Pasang Atap Genteng Beton (m²)
SNI 03-2835-2002 Bahan
Genteng Beton Bh 11.000 5,500.00 60,500.00
Paku Biasa 2" - 5" Kg 0.030 10,000.00 300.00
Tenaga
Pekerja Oh 0.200 36,000.00 7,200.00
Tukang Kayu Oh 0.100 47,500.00 4,750.00
Kepala Tukang Oh 0.010 45,000.00 450.00
Mandor Oh 0.010 40,000.00 400.00
Sub Total 73,600.00

IX PEKERJAAN PLAFON
6.19 A. Pasang List Langit-langit Kayu Profil (m¹)
SNI 03-2835-2002 Bahan
Kayu Profil M¹ 1.100 3,333.33 3,666.67
Paku plafon Kg 0.010 10,000.00
Tenaga
Pekerja Oh 0.050 36,000.00 1,800.00
Tukang Kayu Oh 0.050 47,500.00 2,375.00
Kepala Tukang Oh 0.005 45,000.00 225.00
Mandor Oh 0.003 40,000.00 120.00
Sub Total 8,186.67
6.1 B. Langit-langit Asbes (m²)
SNI 03-2835-2002 Bahan
Pelat Asbes tebal 6mm M² 1.100 32,000.00 35,200.00
Paku plafon Kg 0.010 10,000.00
Tenaga
Pekerja Oh 0.030 36,000.00 1,080.00
Tukang Kayu Oh 0.070 47,500.00 3,325.00
Kepala Tukang Oh 0.007 45,000.00 315.00
Mandor Oh 0.002 40,000.00 60.00
Sub Total 39,980.00

X PEKERJAAN PENUTUP LANTAI DAN DINDING


Pek Tanah 6.11 A. Pekerjaan Urug Pasir Bawah Lantai (m³)
SNI 03-2835-2002 Bahan
Pasir Urug M³ 1.200 100,000.00 120,000.00
Tenaga
Pekerja Oh 0.300 36,000.00 10,800.00
Tukang Gali Oh 0.000 42,500.00 -
Kepala Tukang Oh 0.000 45,000.00 -
Mandor Oh 0.010 40,000.00 400.00
Sub Total 131,200.00
6.47 B. Pasang Lantai Keramik 33X33 cm (m²)
SNI 03-2835-2002 Bahan
Ubin Keramik 33X33 cm Bh 10.000 4,000.00 40,000.00
Semen Portland Kg 11.380 1,050.00 11,949.00
Pasir Pasang M³ 0.042 125,000.00 5,250.00
Semen Warna Kg 1.500 13,000.00 19,500.00
Tenaga
Pekerja Oh 0.620 36,000.00 22,320.00
Tukang Batu Oh 0.350 42,500.00 14,875.00
Kepala Tukang Oh 0.035 45,000.00 1,575.00
Mandor Oh 0.030 40,000.00 1,200.00
Sub Total 116,669.00
6.42 C. Pasang Lantai Keramik 10X20 cm (m²)
SNI 03-2835-2002 Bahan
Ubin Keramik Artistik 10X20 cm Bh 50.000 4,444.44 222,222.22
Semen Portland Kg 11.380 1,050.00 11,949.00
Pasir Pasang M³ 0.042 125,000.00 5,250.00
Semen Warna Kg 1.500 13,000.00 19,500.00
Tenaga
Pekerja Oh 0.620 36,000.00 22,320.00
Tukang Batu Oh 0.350 42,500.00 14,875.00
Kepala Tukang Oh 0.035 45,000.00 1,575.00
Mandor Oh 0.030 40,000.00 1,200.00
Sub Total 298,891.22
6.3 D. Pasang Lantai Ubin Pc Abu-Abu 20X20 cm (m²)
SNI 03-2835-2002 Bahan
Ubin Abu-Abu 20X20 cm Bh 26.500 3,888.89 103,055.56
Semen Portland Kg 10.400 1,050.00 10,920.00
Pasir Pasang M³ 0.014 125,000.00 1,687.50
Tenaga
Pekerja Oh 0.270 36,000.00 9,720.00
Tukang Batu Oh 0.130 42,500.00 5,525.00
Kepala Tukang Oh 0.013 45,000.00 585.00
Mandor Oh 0.014 40,000.00 540.00
Sub Total 132,033.06
6.17 E. Pasang plint ubin pc abu-abu ukuran 10x30 cm (m²)
SNI 03-2835-2002 Bahan
Plint Ubin 10x30 cm Bh 3.530 2,700.00 9,531.00
Semen Portland Kg 1.560 1,050.00 1,638.00
Pasir Pasang M³ 0.003 125,000.00 375.00
Tenaga
Pekerja Oh 0.060 36,000.00 2,160.00
Tukang Batu Oh 0.030 42,500.00 1,275.00
Kepala Tukang Oh 0.003 45,000.00 135.00
Mandor Oh 0.003 40,000.00 120.00
Sub Total 15,234.00

XI PEKERJAAN KUNCI DAN KACA


6.2 A. Pasang Kunci Tanam Biasa (Bh)
SNI 03-2835-2002 Bahan
Kunci Tanam Biasa Bh 1.000 25,000.00 25,000.00
Tenaga
Pekerja Oh 0.010 36,000.00 360.00
Tukang Kayu Oh 0.500 47,500.00 23,750.00
Kepala Tukang Oh 0.010 45,000.00 450.00
Mandor Oh 0.005 40,000.00 200.00
Sub Total 49,760.00
6.5 B. Pasang Engsel pintu (Bh)
SNI 03-2835-2002 Bahan
Engsel Pintu Bh 1.000 8,000.00 8,000.00
Tenaga
Pekerja Oh 0.005 36,000.00 180.00
Tukang Kayu Oh 0.500 47,500.00 23,750.00
Kepala Tukang Oh 0.005 45,000.00 225.00
Mandor Oh 0.000 40,000.00 10.00
Sub Total 32,165.00
6.6 C. Pasang Engsel Jendela Kupu-kupu (Bh)
SNI 03-2835-2002 Bahan
Engsel Jendela Bh 1.000 7,000.00 7,000.00
Tenaga
Pekerja Oh 0.010 36,000.00 360.00
Tukang Kayu Oh 0.100 47,500.00 4,750.00
Kepala Tukang Oh 0.010 45,000.00 450.00
Mandor Oh 0.001 40,000.00 20.00
Sub Total 12,580.00
6.12 D. Pasang Pegangan Pintu/Door holder (Bh)
SNI 03-2835-2002 Bahan
Door holder Bh 1.000 5,000.00 5,000.00
Tenaga
Pekerja Oh 0.050 36,000.00 1,800.00
Tukang Kayu Oh 0.500 47,500.00 23,750.00
Kepala Tukang Oh 0.050 45,000.00 2,250.00
Mandor Oh 0.003 40,000.00 100.00
Sub Total 32,900.00
6.16 E. Pasang Kaca tebal 3 mm (m²)
SNI 03-2835-2002 Bahan
Kaca tebal 3 mm M² 1.100 50,000.00 55,000.00
Tenaga
Pekerja Oh 0.015 36,000.00 -
Tukang Kayu Oh 0.150 47,500.00 -
Kepala Tukang Oh 0.015 45,000.00 -
Mandor Oh 0.001 40,000.00 -
Sub Total 55,000.00
6.23 F. Pasang Kaca wireglass tebal 5 mm (m²)
SNI 03-2835-2002 Bahan
Kaca Wireglass 5 mm M² 1.100 90,000.00 99,000.00
Tenaga
Pekerja Oh 0.015 36,000.00 540.00
Tukang Kayu Oh 0.150 47,500.00 7,125.00
Kepala Tukang Oh 0.015 45,000.00 675.00
Mandor Oh 0.001 40,000.00 30.00
Sub Total 107,370.00

XII PEKERJAAN PENGECATAN


ALS A. Pengecatan Kayu (m²)
Bahan
Cat Meni Kg 0.200 18,000.00 3,600.00
Kertas Gosok Lbr 0.400 3,000.00 1,200.00
Plamir Kg 0.150 18,000.00 2,700.00
Cat dasar Kg 0.170 20,000.00 3,400.00
Cat penutup 2 kali Kg 0.260 38,000.00 9,880.00
Minyak Cat Ltr 0.150 12,000.00 1,800.00
Kuas 3" Bh 0.050 10,000.00 500.00
Tenaga
Pekerja Oh 0.070 36,000.00 2,520.00
Tukang Cat Oh 0.009 42,500.00 382.50
Kepala Tukang Oh 0.006 45,000.00 270.00
Mandor Oh 0.003 40,000.00 100.00
Sub Total 26,352.50
ALS B. Pengecatan Tembok Baru (m²)
Bahan
Plamir Kg 0.100 12,000.00 1,200.00
Kertas gosok LBR 1.000 3,000.00 3,000.00
Cat Dasar Kg 0.100 35,000.00 3,500.00
Cat Penutup 2x Kg 0.260 60,000.00 15,600.00
Tenaga
Pekerja Oh 0.020 36,000.00 720.00
Tukang Cat Oh 0.063 42,500.00 2,677.50
Kepala Tukang Oh 0.006 45,000.00 270.00
Mandor Oh 0.003 40,000.00 100.00
Sub Total 27,067.50

XIII PEKERJAAN INSTALASI LISTRIK


ALS A. Penyambungan Listrik PLN 2400 watt (LS)
Penyambungan PLN LS 1.000 1,800,000.00 1,800,000.00
ALS B. Pemasangan Lampu SL 25 Watt (Bh)
Lampu SL 25 Watt Bh 1.000 55,000.00 55,000.00
ALS C. Pemasangan Sekering Group (Bh) -
Sekering Group Bh 1.000 50,000.00 50,000.00
ALS D. Pemasangan Stop Kontak (Bh) -
Stop kontak Bh 1.000 50,000.00 50,000.00
ALS E. Pemasangan Sakelar Tunggal (Bh) -
Sakelar Tunggal Bh 1.000 45,000.00 45,000.00
ALS F. Pemasangan Sakelar Ganda (Bh) -
Sakelar Ganda Bh 1.000 50,000.00 50,000.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN

Propinsi : Kalimantan Barat


Kabupaten : Kubu Raya
Tahun : 2012

Harga Upah
No Uraian Tenaga Kerja Satuan Kode
Wilayah I

A. UPAH
1 Mandor Lapangan L 061 L.061 82,500.00
2 Mekanik L 071 L.071 82,500.00
3 Mekanik Pembantu L 072 L.073 77,000.00
2 Kepala Tukang L 073 L.079 82,500.00
3 Tukang L 079 L.081 77,000.00
4 Operator Terlatih *) L 081 L.082 71,500.00
5 Operator Kurang Terlatih *) L 082 L.091 66,000.00
6 Pembantu Operator L 083 L.101 66,000.00
7 Supir Material / Truck L 091 L.106 71,500.00
8 Supir Personil L 092 71,500.00
9 Pembantu Supir / Kernet L 099 66,000.00
4 Buruh Lapangan Tak Terlatih L 101 66,000.00
5 Buruh Lapangan Agak Terlatih L 103 71,500.00
6 Buruh Lapangan Terlatih L 106 77,000.00
7 Penjaga Api - 55,000.00
8 Penjaga Malam - 66,000.00
9 Pengawas - 82,500.00
10 Pengatur - 77,000.00

Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan jenis peralatan untuk melayani pekerjaan berat
misal : Bulldozer, Grader, Whell, Loader, Asphalt Finisher, dll
*) Operator yang mengoperasikan peralatan untuk melayani pekerjaan yang agak ringan
misal : Stell Wheeled Roller, Stamper, Concrete Mixer / Mesin Pengaduk Beton dll
*) Harga Upah dan Bahan Sudah Termasuk PPN 10 %
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

B. BAHAN PENGISI
1 Batu Kong M³ M.101 320,250.00
2 Batu Sap Pinang M³ - 448,350.00
1 Batu pecah 10-15 cm M³ - 512,400.00
4 Batu pecah 5-7 cm M³ M.022 446,215.00
5 Batu pecah 3-5 cm M³ M.023 516,670.00
6 Batu pecah 2-3 cm M³ M.024 540,155.00
7 Batu pecah 1-2 cm M³ M.025 634,095.00
8 Batu pecah 1-1 cm M³ - 657,580.00
2 Batu pecah 0,5 cm M³ M.026 657,580.00
3 Stone Dust M³ - 657,580.00
4 Aspal Kg - 17,848.60
3 Pasir M³ M.040 126,819.00
4 Semen PC Zak M.080 95,818.80
14 Tanah Timbunan Pilihan M³ M.050.a 187,880.00
15 Paving Block Bh - 3,663.66
5 Bataco 15 x 30 x 7 cm Bh - 1,409.10
6 Bataco 20 x 40 x 9 cm ( press ) Bh - 3,945.48
7 Bataco 20 x 40 x 7 cm ( press ) Bh - 2,818.20
8 Kerawang ( roster ) 18 x 18 cm Bh - 35,932.05
9 Kerawang press ( roster ) 30 x 30 cm Bh - 54,954.90
6 Keramik 20 x 20 cm Kotak - 70,455.00
7 Keramik 30 x 30 cm Kotak - 70,455.00
8 Keramik 30 x 30 cm Unpolished Kotak - 77,500.50
9 Keramik 30 x 30 cm Artistik Kotak - 91,591.50
9 Keramik 40 x 40 cm (biasa) Kotak - 93,000.60
10 Keramik 40 x 40 cm Polished (setaraf Indogress) Kotak - 211,365.00
11 Keramik 40 x 40 cm Polished (setaraf Decogress) Kotak - 140,910.00
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

12 Keramik 40 x 40 cm Unpolished (setaraf Indogress) Kotak - 204,319.50


13 Keramik 40 x 40 cm Unpolished (setaraf Decogress) Kotak - 183,183.00
10 Keramik 60 x 60 cm Polished (setaraf Indogress) Kotak - 401,593.50
11 Keramik 60 x 60 cm Polished (setaraf Decogress) Kotak - 298,729.20
12 Granito 40 x 40 cm Kotak - 246,592.50
13 Marmer M² - 1,690,920.00
14 Wood Flooring M² - 366,366.00
15 List Keramik WC. 8 x 20 cm Bh - 14,091.00
16 Plint Kayu uk. 2 x 10 cm Bh - 73,695.93
17 Keramik dinding 20 x 20 cm Kotak - 77,500.50
18 Keramik dinding 20 x 25 cm Kotak - 84,546.00
19 Floor Hardener Kg - 12,681.90
20 Beton Ready Mix B 0 M³ - 1,287,212.85
21 Beton Ready Mix 125 M³ - 1,390,781.70
22 Beton Ready Mix 175 M³ - 1,486,600.50
23 Beton Ready Mix 225 M³ - 1,676,829.00
24 Beton Ready Mix 300 M³ - 1,782,511.50
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

25 Additive Ready Mix Liter - 53,545.80


26 Karung Goni Curing Beton ( 0.7m² ) Lembar - 15,500.10
27 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg - 1,550,010.00
28 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg - 2,036,149.50
29 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg - 1,323,144.90
30 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg - 1,476,736.80
31 Papan Turap Uk. 15/50 - 5m - K 300 Kpg - 1,175,189.40
32 Papan Turap Uk. 15/50 - 6m - K 300 Kpg - 1,499,282.40
33 Pemancangan Mini Pile - 6m Btg - 176,137.50
34 Sewa Pompa Ready Mix (Min. 100 M³) M³ - 73,414.11
35 Bahan Plastik Cor Beton M² - 4,720.49

C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³ - 15,656,666.67
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³ - 13,659,642.86
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³ - 11,559,023.44
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M M³ - 11,008,593.75
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³ M.181.a 12,500,000.00
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³ M.181.b 12,329,625.00
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³ - 14,062,500.00
8 Ky. Belian tdk ketam Uk. 15/15 - 4 M M³ 14,873,833.33
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M M³ - 14,091,000.00
10 Ky. Belian tdk ketam Uk. 4/8 - 4 M M³ 14,780,000.00
11 Ky. Belian ketam Uk. 6/6 - 4 M M³ - 16,635,208.33
12 Ky. Belian ketam Uk. 7/7 - 4 M M³ - 13,659,642.86
13 Ky. Belian ketam Uk. 8/8 - 4 M M³ - 12,109,453.13
14 Ky. Belian ketam Uk. 5/10 - 4 M M³ - 14,795,550.00
15 Ky. Belian ketam Uk. 4/8 - 4 M M³ - 15,412,031.25
16 Papan belian ketam (4m) M³ M.181.e 18,266,111.11
17 Papan belian tdk ketam (4m) M³ M.181.d 16,961,388.89
18 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³ 14,091,000.00
19 Ky. klas II uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.f 4,953,867.19
20 Ky. klas II uk. 8/8 - 4 M ( ketam ) M³ M.181.g 5,504,296.88
21 Ky. klas II uk. 7/7 - 4 M ( tdk ketam ) M³ - 5,032,500.00
22 Ky. klas II uk. 7/7 - 4 M ( ketam ) M³ - 5,751,428.57
23 Ky. klas II uk. 4/6 - 4 M ( tdk ketam ) M³ 5,577,687.50
24 Ky. klas II uk. 5/7 - 4 M ( tdk ketam ) M³ - 5,032,500.00
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

25 Ky. klas II uk. 5/10 - 4 M ( tdk ketam ) M³ M.181.h 4,931,850.00


26 Ky. klas II uk. 6/12 - 4 M ( tdk ketam ) M³ M.181.i 5,871,250.00
27 Ky. klas II uk. 4/8 - 4 M ( tdk ketam ) M³ - 5,504,296.88
28 Ky. klas II uk. 3/5 - 4 M ( tdk ketam ) M³ - 5,871,250.00
29 Ky. klas II uk. 8/15 - 4 M ( tdk ketam ) M³ - 4,990,562.50
30 Ky. klas II uk. 8/12 - 4 M ( tdk ketam ) M³ - 5,504,296.88
31 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³ - 3,053,050.00
32 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³ - 2,642,062.50
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

1 Papan kayu klas II tdk ketam M³ M.181.j 9,670,294.12


2 Papan kayu klas II ketam M³ M.181.k 7,968,460.50
3 Papan kayu klas I tdk ketam M³ - 16,961,388.89
4 Papan kayu klas I ketam M³ - 18,266,111.11
2 Papan mal klas III M³ M.181.l 2,201,718.75
3 Papan Simpiran M³ - 1,409,100.00
4 Renglat kayu klas II uk 1/4 cm Btg - 49,318.50
5 Kayu profil 10cm Btg - 35,227.50
6 Kayu cerucuk /dolken ø 4 - 6 - Pj. 4 M Btg - 6,834.14
3 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg - 12,681.90
4 Kayu cerucuk /dolken ø 8 - 10 - Pj. 4 M Btg - 16,627.38
5 Kayu cerucuk /dolken ø12 - Pj. 12 M Btg - 97,932.45
6 Kayu cerucuk /dolken ø 15 - Pj. 12 M Btg - 119,773.50
7 Kayu Simpiran / Bakar M³ - 337,500.00
8 Alas laci Btg - 20,009.22
9 Wood Plank M' - 73,273.20

D. BAHAN CAT
1 Amplas Lbr - 3,522.75
2 Minyak cat Kg - 34,522.95
1 Cat kilat Kg - 55,659.45
2 Plamur Kg - 36,213.87
2 Cat dasar Kg - 58,477.65
3 Cat tembok Kg - 89,477.85
4 Cat tembok type weather shield Kg - 219,819.60
5 Cat seng Kg - 235,319.70
4 Dempul Kg - 45,091.20
5 Plitur Kg - 60,873.12
6 Thiner Ltr M.090.f 31,704.75
7 Thiner ND Ltr - 39,454.80
8 Melamic Ltr - 71,159.55
9 Vernis Ltr - 86,659.65
5 Meni Kg - 78,909.60
6 Oker Kg - 67,636.80
7 Lem Kayu Kg - 26,068.35
8 Sealent Tube - 166,978.35
9 Soda Api Kg - 23,954.70
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

10 Sabun / cream pembersih kotoran Kg - 24,659.25


11 Teak Oil Ltr - 58,618.56
12 Ter / Residu Ltr - 70,595.91
13 Kuas 4" Bh - 25,081.98
14 Road Line Paint ( Cat Marka ) Ltr M.090.e 119,773.50
15 Glass Bit Kg M.090.g 48,613.95
16 Weatherbond Emulsion ( cat kerb ) Kg M.090.h 133,159.95
17 Termoplast Kg - 50,023.05
18 Water Proofing M² - 88,773.30
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton Kg M.167 19,022.85
2 Besi wire mesh ø 5 Kg - 24,941.07
2 Kawat baja/bendrat Kg M.168 23,954.70
3 Simpai roll Kg - 28,182.00
4 Kawat simpai Kg - 66,227.70
5 Baut dia 4/8 " pj = 20 cm Btg M.163 10,004.61
6 Besi Penahan bh - 40,159.35
7 Beugel plat L. 3 cm bh - 51,432.15
8 Plat 1,2 x 2,4 x 12 Bh - 591,822.00
9 Besi Konstruksi (I, H) Kg - 23,954.70
10 Besi Konstruksi ( C ) Kg - 24,659.25
11 Besi Konstruksi (siku ) Kg - 24,659.25
12 Kawat Las Btg - 27,477.45
13 Kawat Las Kg - 155,001.00
14 Kawat harmonika M² - 48,613.95
15 Kawat kasa M² - 18,318.30
16 Pipa galvanis dia 3/4" Btg - 180,364.80
17 Pipa galvanis dia 1/2" Btg - 147,955.50
18 Pipa galvanis dia 1" Btg - 232,501.50
19 Pipa galvanis dia 1 1/4" Btg - 326,911.20
20 Pipa galvanis dia 1 1/2" Btg - 380,457.00
21 Pipa galvanis dia 2" Btg - 465,003.00
22 Pipa galvanis dia 3" Btg - 746,823.00
3 Pipa galvanis dia 4" Btg - 1,021,597.50
4 Folding gate M² - 859,551.00
5 Rangka Aluminium 1 1/2" x 3" Meter - 109,909.80
6 Rangka Aluminium 1 3/4" x 4" Meter - 140,910.00
7 Pintu Aluminium std IKP, lengkap 4" Unit - 3,180,338.70
4 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m) M² - 200,000.00
5 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) M² - 352,275.00
6 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m) M² - 263,501.70
7 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) M² - 394,548.00
8 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) M² - 233,910.60
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

9 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) M² - 293,092.80
10 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m) M² - 250,819.80
11 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) M² - 338,184.00
12 Alumunium Komposit + Rangka Besi M² - 1,268,190.00
5 Rangka Plafond Metal Furing + Pemasangan M² - 178,955.70
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC Bh - 366,366.00
2 Kait angin Bh - 18,318.30
3 Handle Jendela Bh - 20,009.22
4 Handle Pintu Bh - 197,274.00
1 Engsel jendela Bh - 29,872.92
2 Engsel pintu Bh - 40,159.35
3 Slot pintu Bh - 24,800.16
4 Slot jendela Bh - 28,886.55
5 Kunci tanam 2 slag (setaraf Belluci) Bh - 222,637.80
6 Kunci tanam 1 slag Bh - 225,456.00
7 Kunci tanam antik Bh - 215,592.30
8 Kunci tanam biasa Bh - 107,091.60
9 Kunci silinder Bh - 133,864.50
10 Door Closer Bh - 281,820.00
11 Door Stoper Bh - 93,000.60
12 Paku Seng Kg M.166.a 29,591.10
5 Paku campuran 1" - 5 " Kg M.166.b 25,363.80
6 Paku beton Kg - 33,113.85
7 Paku Atap Seng Kg M.166.c 33,113.85
8 Paku triplek Kg - 35,227.50
6 Paku GRC Kg - 35,227.50
7 Sekrup Gypsum Kg - 117,659.85
8 Sekrup Fixer Bh - 2,007.97
9 Sekrup Steel Sheet Bh - 634.10
10 Sekrup Zincalume Bh 704.55
11 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm Unit - 5,847,765.00
12 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm Unit - 2,930,928.00
13 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm Unit - 2,184,105.00
14 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca) Unit - 873,642.00
15 Kusen Alumunium M' - 102,864.30

G. BAHAN ATAP
1 Sirap belian Lbr - 7,327.32
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

2 Asbes Lbr - 69,045.90


3 Eternit M² - 95,818.80
4 Genteng Metal Type Prima 0.35 Lbr - 84,546.00
5 Genteng Metal Type Royal 0.35 Lbr - 84,546.00
6 Genteng Metal Type Classic 0.35 Lbr - 81,727.80
7 Genteng Metal Stone ( Type Classic 0.35 ) Lbr - 108,500.70
1 Genteng Metal Stone ( Type Prima 0.35 ) Lbr - 108,500.70
2 Atap Metal Supersheet 0.35 (polos) M' - 112,728.00
3 Atap Metal Supersheet 0.35 (polos) M² - 155,001.00
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

4 Atap Trim Deck 0.3 (polos) M² - 139,500.90


5 Atap Trim Deck 0.33 (color) M² - 156,410.10
6 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh - 85,955.10
7 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh - 105,682.50
8 Nok bubungan genteng metal kotak 0.35 M' - 114,137.10
2 Nok bubungan genteng metal stone kotak 0.35 M' - 135,273.60
3 Nok bubungan Trim Deck (polos) M' - 152,182.80
4 Nok bubungan Trim Deck (color) M' - 171,910.20
5 Nok bubungan Steel Sheet 0.33 (color) (pj 50 cm) M' - 62,000.40
6 Nok bubungan Steel Sheet 0.43 (color) (pj 50 cm) M' - 70,455.00
7 Nok bubungan Steel Sheet 0.35 (polos) (pj 50 cm) M' - 57,068.55
8 Nok bubungan Steel Sheet 0.40 (polos) (pj 50 cm) M' - 62,000.40
9 Seng Gelombang Bjls 30 Lbr - 88,068.75
10 Seng Gelombang Bjls 20 Lbr - 62,704.95
11 Seng Plat Bjls 20 Lbr - 64,114.05
12 Seng Plat Bjls 30 Lbr - 88,068.75
13 Seng Plat Bjls 30 (lebar 45 cm) M' - 27,900.18
14 Plat Datar Color 0.35 Lbr - 76,091.40
15 Zincalume Gelombang Persegi 0.35 (polos) M² - 167,682.90
16 Zincalume Gelombang Persegi 0.30 (polos) M² - 147,955.50
17 Zincalume Gelombang Persegi 0.35 (color) M² - 187,410.30
18 Zincalume Gelombang Persegi 0.30 (color) M² - 167,682.90
19 Zincalume Plat 0.2 Lbr - 174,728.40
20 Aluminium Foil M² - 73,273.20
21 Atap Steel Sheet 0.33 (color) M² - 156,410.10
22 Atap Steel Sheet 0.40 (polos) M² - 156,410.10
23 Papan Belian utk Atap uk. 1/15 pj. 50 cm Lbr 21,136.50

H. BAHAN KACA
1 Kaca Polos, t = 5 mm M² - 162,046.50
2 Kaca Polos, t = 12mm M² - 732,732.00
3 Kaca Rayben, t = 5 mm M² - 194,455.80
4 Kaca Cermin t = 3mm M² - 293,092.80
5 Kaca Patri M² - 3,663,660.00
6 Sealent Kg - 147,955.50
7 Nako + Bingkai (80 x 15) x 10 daun polos Bh - 338,184.00
8 Nako + Bingkai (80 x 15) x 10 daun rayben Bh - 377,638.80
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

9 Kaca Es M² - 222,637.80
10 Kaca Polos, t = 8 mm M² - 380,457.00
11 Kaca Raindown, t = 5 mm M² - 193,046.70
12 Kaca Buram, t = 5 mm M² - 193,046.70
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr - 77,500.50
2 Triplek t = 6 mm Lbr - 155,001.00
3 Triplek t =9 mm Lbr - 218,410.50
4 Multiplek t = 10 mm Lbr - 250,819.80
5 Multiplek t = 12 mm Lbr - 279,001.80
6 Plywood 4' x 8' x 4mm Lbr - 132,455.40
1 Panel GRC 120 x 240 x 40 Lbr - 78,909.60
2 GypsumBoard t = 9mm Lbr - 81,727.80

J. BAHAN SANITASI
1 Kloset duduk monoblok Bh - 2,254,560.00
2 Kloset duduk putih (setaraf TOTO) Bh - 2,719,563.00
3 Kloset duduk warna (setaraf TOTO) Bh - 2,987,292.00
4 Kloset jongkok (setaraf TOTO) Bh - 472,500.00
5 Kloset jongkok (setaraf INA) Bh - 270,000.00
2 Kran air uk 1/2" Bh - 46,500.30
3 Pipa paralon dia 1/2" Btg - 21,841.05
3 Pipa paralon dia 3/4" Btg - 33,536.58
4 Pipa paralon dia 1" Btg - 49,318.50
5 Pipa paralon dia 2" Btg - 74,682.30
6 Pipa paralon dia 3" Btg - 142,319.10
7 Pipa paralon dia 4" Btg - 215,592.30
8 Pipa paralon dia 6" Btg - 845,460.00
9 Fiber Glass 1/2 M3 M³ - 1,045,875.60
10 Fiber Glass 1 M3 M³ 2,091,751.20

K. BAHAN MINYAK DAN BAHAN PELENGKAP ALAT BERAT


1 Minyak solar non subsidi Ltr M.183 11,492.25
1 Minyak solar Ltr M.183 5,400.00
2 Minyak solar industri Ltr - 11,825.00
3 Bensin premium Ltr M.184 5,400.00
4 Minyak pelumas Ltr M.185 30,751.88
5 Oli BEO 154W40/Cat Ltr - 59,280.38
6 Minyak tanah Ltr M.064 11,145.75
7 Gas Elpiji Kg - 10,568.25
8 Alat-alat bantu Set M.170 76,091.40
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

9 Sewa Alat Untuk Pengelasan Jam - 83,136.90


11 Sewa kuali termasuk angkutan Set - 84,546.00
12 Metting/Landasan Btg - 119,773.50
13 Drum Kosong Bh - 310,312.00
14 Majun/Lap Kg - 23,273.40
15 Slang Plstik 3/4" M - 12,399.22
16 Jerigen Plastik 20 L Bh - 62,062.40
17 Corong Minyak Bh - 15,515.60
18 Pompa Minyak Bh - 757,479.55
19 Sabun Deterjen Kg - 38,789.00
20 Obat-obatan Pcs - 310,312.00
21 Air Accu Botol - 4,641.42
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

L. BAHAN ALAT-ALAT LISTRIK


1 Armatur lampu High Mass Holovent 400 watt (lengkap) Unit - 22,022,287.10
2 Armatur lampu SGP 338 / SONT 400 Watt Unit - 9,129,592.45
3 Armatur lampu SGP 328 / SONT 250 Watt Unit - 6,230,167.90
4 Armatur lampu SGP 338 / SONT 400 Watt (lengkap) Unit - 8,538,475.00
5 Armatur lampu SGP 368 / SONT 250 Watt (lengkap) Unit - 7,150,075.35
6 Armatur lampu LVD 100 Watt (lengkap) Unit - 8,260,647.45
7 Armatur lampu Ekorola TRX 800 - 20 Watt (set) Set - 910,714.75
8 Armatur lampu Sorot HPIT 250 Watt (lengkap) Set - 11,165,674.85
9 Sorot HPIT 250 watt (lengkap) Set - 9,304,757.00
10 XKS SON T 250 watt (lengkap) Set - 6,020,715.25
11 Tiang Artagonal Cabang 2 T = 11 M Tiang - 12,970,362.90
12 Tiang Artagonal Cabang 1 T = 11 M Tiang - 11,383,078.85
13 Tiang Oktagonal Cabang 2 T = 11 M Btg - 12,104,169.00
14 Tiang Oktagonal Cabang 1 T = 11 M Btg - 12,712,967.30
15 Tiang high mass 22 m cab. 5 ring Tiang - 112,423,030.50
16 Tiang high mass 22 m cab. 4 ring Tiang - 134,906,160.40
17 Tiang lampu oktagonal 11 m Btg - 18,127,803.10
18 Tiang lampu oktagonal 12 m Btg - 20,676,093.35
19 Tiang lampu oktagonal cab. 4 Ring 12 Mtr Btg - 18,127,434.05
20 Tiang lampu oktagonal cab. 2 (11m) Btg - 19,047,341.50
21 Stang Ornamen Galvanis dia 2" Pj. 7 M + Klem Tiang Btg - 1,644,151.30
22 Stang Ornamen Galvanis dia 2" Pj. 6 M + Klem Tiang Btg - 1,644,084.20
23 Stang Ornamen Galvanis dia 2" Pj. 5 M + Klem Tiang Btg - 1,530,718.75
24 Stang Ornamen Galvanis dia 2" Pj. 3 M + Klem Tiang 12 - 1,140,666.45
25 Stang Ornamen Galvanis dia 2" Pj. 2 M + Klem Tiang Btg - 864,717.70
26 Box Panel PJU Uk. 60x90x30 Cm lengkap Time Swich Set - 7,800,710.50
27 Box Panel PJU Uk. 50x45x25 Cm lengkap Time Swich Set - 5,646,766.95
28 Box KWH Meter Uk. 35 x 50 x 25 cm Buah - 1,333,847.35
29 Traffo HPL 400 Watt Buah - 417,663.95
30 Traffo HPL 250 Watt Buah - 337,915.60
31 Traffo HPL 125 Watt Buah - 208,815.20
32 Traffo SOX 135 Watt Buah - 1,409,737.45
33 Traffo SOX 180 Watt Buah - 1,409,737.45
34 Traffo SON T 400 Watt Buah - 1,554,639.90
35 Traffo SON T 250 Watt Buah - 768,429.20
36 Traffo SON T 125 Watt Buah - 626,143.65
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

37 Traffo SON T 70 Watt Buah - 498,955.60


38 Traffo SON H 400 Watt Buah - 241,761.30
39 Traffo SON H 250 Watt Buah - 684,554.20
40 Traffo SON H 125 Watt Buah - 469,901.30
41 Traffo SON H 70 Watt Buah - 415,349.00
42 Traffo HPiT 400 Buah - 247,934.50
43 Traffo Neon 40 Watt Buah - 452,421.75
44 Traffo Neon 20 Watt Buah - 32,811.90
45 Traffo Neon 10 Watt Buah - 27,376.80
46 Traffo 400 Watt Buah - 24,088.90
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

47 HPL 250 Watt Buah - 339,458.90


48 HPL 125 Watt Buah - 248,068.70
49 HPL 135 Watt Buah - 117,425.00
50 SOX 180 Watt Buah - 812,111.30
51 SOX 160 Watt Buah - 812,111.30
52 MLL Buah - 117,425.00
53 Bola SON T 1000 Watt Buah - 1,241,886.80
54 Bola SON T 400 Watt Buah - 562,969.00
55 Bola SON T 250 Watt Buah - 542,738.35
56 Bola SON T 150 Watt Buah - 415,349.00
57 Bola Lampu SON 70 Watt Buah - 281,887.10
58 SON H 400 Watt Buah - 469,901.30
59 SON H 250 Watt Buah - 469,901.30
60 SON H 125 Watt Buah - 415,349.00
61 SON H 70 Watt Buah - 250,853.35
62 Bola Lampu HPIT 400 Watt Buah - 601,249.55
63 HPIT 400 Watt Buah - 579,811.10
64 Seri 200 Biji Kotak - 99,039.60
65 Seri Kuning Kotak - 99,039.60
66 Neon Sen Meter - 74,346.80
67 Pijar 5 Watt Buah - 3,757.60
68 Pijar 20 Watt Buah - 6,240.30
69 Pijar 25 Watt Buah - 6,240.30
70 Pijar 40 Watt Buah - 6,240.30
71 Pijar 60 Watt Buah - 8,857.20
72 Pijar 75 Watt Buah - 8,857.20
73 Pijar 80 Watt Buah - 7,045.50
74 Pijar 100 Watt Buah - 11,138.60
75 Pijar 200 Watt Buah - 24,726.35
76 Neon 40 Watt Buah - 72,870.60
77 Neon 20 Watt Buah - 39,488.35
78 Neon 10 Watt Buah - 20,566.15
79 Lampu Ekorola TRX 800 - 20 watt (set) Set - 961,140.40
80 Lampu Light Grick Buah - 235,453.90
81 Lampu Genite 16 Watt Buah - 74,346.80
82 Lampu XL 14 Watt Buah - 61,899.75
83 Lampu Sorot 300 Watt Buah - 245,619.55
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

84 Lampu Nepalos 25 Watt Buah - 61,899.75


85 Lampu Superlox 25 Watt Buah - 9,830.15
86 Lampu Superlox 40 Watt Buah - 11,138.60
87 Lampu Fisikom 25 Watt Buah - 61,899.75
88 Lampu Fisikom 23 Watt Buah - 61,899.75
89 Lampu Fisikom 18 Watt Buah - 49,620.45
90 Lampu Mercury 125 Watt Buah - 125,409.90
91 Lampu Mercury 250 Watt Buah - 264,776.60
92 Lampu Sunyco 45 Watt Buah - 148,660.05
93 Lampu Matsuka 8 Watt Buah - 37,173.40
94 Lampu Matsuka 14 Watt Buah - 39,622.55
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

95 Lampu Matsuka 18 Watt Buah - 56,967.90


96 Lampu Matsuka 20 Watt Buah - 66,965.80
97 Lampu Matsuka 25 Watt Buah - 69,448.50
98 Lampu Par 38 Watt Buah - 91,692.15
99 Lampu Taman Buah - 61,899.75
100 SL 15 Watt Buah - 206,332.50
101 SL 18 Watt Buah - 80,385.80
1 SL 25 Watt Buah - 103,937.90
2 TL Rina 32 Watt Buah - 49,452.70
3 Bola Essetial Buah - 59,584.80
2 Bola Spot Light Buah - 92,832.85
3 Bola Lampu Sorot 300 Watt Buah - 245,619.55
4 Hologen 500 Watt Buah - 71,897.65
5 Hologen 1.000 Watt Buah - 141,312.60
6 Hologen 1.51 x 1.5 mm Buah - 160,972.90
7 NYY 1 x 2.5 mm Meter - 5,300.90
8 NYY 1 x 4 mm Meter - 8,253.30
9 NYY 1 x 6 mm Meter - 12,983.85
10 NYY 2 mm Meter - 20,062.90
11 NYY 2 x 2.5 mm Meter - 21,807.50
12 NYY 2 x 4 mm Meter - 31,268.60
13 NYY 2 x 6 mm Meter - 29,658.20
14 NYY 2 x 10 mm Meter - 39,119.30
15 NYY 3 x 4 mm Meter - 42,407.20
16 NYY 4 x 2.5 mm Meter - 41,870.40
17 NYY 4 x 4 mm Meter - 61,899.75
18 NYY 4 x 6 mm Meter - 100,515.80
19 NYY 4 x 10 mm Meter - 136,749.80
20 NYY 4 x 16 mm Meter - 117,726.95
21 NYY 4 x 25 mm Meter - 488,286.70
22 NYY 4 x 35 mm Meter - 545,254.60
23 NYY 4 x 50 mm Meter - 669,020.55
24 NYY 4 x 70 mm Meter - 240,352.20
25 NYN 2 x 2,5 mm Meter - 27,712.30
26 NYN 3 x 1,5 mm Meter - 22,679.80
27 NYN 3 x 2,5 mm Meter - 33,046.75
28 NYA 1 x 1,5 mm Meter - 30,966.65
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

29 NYA 1 x 2,5 mm Meter - 47,339.05


30 NYA 1 x 4 mm Meter - 53,948.40
31 NYA 1 x 6 mm Meter - 80,587.10
32 NYF6BY 4 2 x 2,5 mm Meter - 227,401.90
33 NYF6BY 4 2 x 4 mm Meter - 250,618.50
34 NYF6BY 4 2 x 30 mm Meter - 297,420.75
35 NYF6BY 4 4 x 6 mm Meter - 366,198.25
36 NYF6BY 4 1,5 mm Meter - 488,018.30
37 NYF6BY 4 4 mm Meter - 632,518.15
38 NYM 10 mm Meter - 6,374.50
39 NYM 16 mm Meter - 35,193.95
40 NYM Meter - 10,635.35
41 NYM Meter - 26,202.55
42 NYM Meter - 18,184.10
43 NYM Meter - 7,884.25
44 NYM Meter - 9,830.15
45 NYM Meter - 14,091.00
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

40 NYM 4 mm Meter - 49,452.70


41 NYM 3 x 4 mm Meter - 18,016.35
42 NYM 2 x 2 mm Meter - 45,527.35
43 NYMHYM 2 x2 x 4 mm Meter - 5,569.30
44 NYMHYM 2 x2 x 2,5 mm Meter - 9,494.65
45 Traffo SON 2 x 1,5 mm Buah - 1,660,288.85
46 Kabel Snur 3 x 1,5 mm Roll - 99,039.60
47 Kabel Tester3 x 2,5 mm Meter - 49,452.70
48 Kabel Box 3 x 10 mm Meter - 99,039.60
49 Kabel Mic T 4 x 2,5 mm Roll - 322,080.00
50 Kabel 3 x 2 4 x 4 mm Meter - 14,091.00
51 Kabel Antena Roll - 61,899.75
52 Kabel H / M Meter - 3,623.40
53 Kabel Transparan Meter - 4,931.85
54 Kabel Telepon Meter - 2,952.40
55 Kabel TC 2 x 10 mm Meter - 12,681.90
56 Kabel TC 2 x 16 mm Meter - 17,680.85
57 Box TL 20 Watt Buah - 14,762.00
58 Box MCB 1 Group Buah - 7,381.00
59 Cal Gulung Buah - 99,039.60
60 Contactor 100 A Buah - 1,975,658.85
61 Conector Buah - 14,258.75
62 Dop 3" Buah - 12,447.05
63 Esensial Buah - 61,899.75
64 Fitting Gantung Buah - 2,616.90
65 Fitting Duduk Buah - 6,240.30
66 Fitting Atom Buah - 49,620.45
67 Fitting Gantung E 27 Buah - 31,167.95
68 Fitting Duduk E 27 Buah - 31,167.95
69 Fitting Duduk E 40 Buah - 39,521.90
70 Fitting Hologen Buah - 49,620.45
71 Full Breket Buah - 22,344.30
72 Gulung Spul Buah - 123,967.25
73 Gulung Coil Contactor Buah - 123,967.25
74 Isolasi Unibel Buah - 8,857.20
75 Icnitor SN 58 Buah - 178,418.90
76 Inector Buah - 148,660.05
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

77 Ignator Buah - 172,715.40


78 Indiktor Buah - 232,501.50
79 Insuluk Buah - 570.35
80 Kapasitor Buah - 279,001.80
81 Kap Hijau E 27 Buah - 49,117.20
82 Kap Hijau E 40 Buah - 78,607.65
83 Kap Lampu Buah - 173,386.40
84 Kap To2 Buah - 173,386.40
85 Kop Skring Buah - 7,481.65
86 Klem Tiang Buah - 19,895.15
87 k. Skum 10-8 Buah - 1,509.75
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

88 MCB 1.A Buah - 53,612.90


89 MCB 2.A Buah - 62,537.20
90 MCB 25 A Buah - 272,862.15
91 MCB 63 A Buah - 447,087.30
92 MCB 40 A Buah - 232,233.10
93 MCB 45 A Buah - 301,681.60
94 MCB 50 A Buah - 420,884.75
95 MCB 10 A Buah - 200,092.20
96 MCB 16 A Buah - 214,350.95
97 MCB 6 A Buah - 240,519.95
98 MCB 32 A Buah - 503,719.70
99 MCB Box Buah - 6,240.30
100 Multi Tester Buah - 111,520.20
101 MC Se-3 N Buah - 1,628,349.25
102 Macon Mec gmg-50 aC Buah - 892,195.15
103 Magnetic Contactor 100 A Buah - 2,370,777.20
104 NH Fuse 80 A Buah - 44,688.60
105 Ornamen Pijar Buah - 581,757.00
106 Ornamen Gantung Buah - 86,760.30
107 Obeng Plus Buah - 62,537.20
108 Obeng Minus Buah - 62,537.20
109 Open Steker Buah - 53,612.90
110 On - Off Buah - 11,205.70
111 Pat 38 Buah - 92,933.50
112 Solar Seal / Photo Seal Buah - 223,006.85
113 Opstic 1/2" lengkap klem Batang - 409,175.80
114 Pipa Paralon 1/2" Batang - 13,688.40
115 Pipa L 1/2" Batang - 3,757.60
116 Pipa Paralon 1' Batang - 16,137.55
117 Pipa Paralon 3/4" Batang - 14,896.20
118 Pipa Paralon 3' Batang - 29,792.40
119 Pipa PVC 1,5" Batang - 77,701.80
120 Pipa PVC Galvanis 1,5" Batang - 267,930.30
121 Pipa Besi Batang - 148,660.05
122 Pipa Galvanis Batang - 173,487.05
123 Pipa ornamen dia 2" x 2m Batang - 783,325.40
124 Pipa ornamen dia 2" x 3m lengkap klem Batang - 1,017,135.35
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

125 Pipa ornamen dia 2" x 6m lengkap klem Batang - 2,045,879.00


126 Pipa ornamen dia 2" x 7m lengkap klem Batang - 2,279,688.95
127 Pondasi tiang lampu oktagonal (11 meter) Unit - 2,571,943.00
128 Pres Conector Buah - 5,032.50
129 Rangka Ring 32 Watt Buah - 24,726.35
130 Rel MCB Buah - 37,173.40
131 Roset Telpon Buah - 8,756.55
3 Saklar Double Buah - 11,205.70
4 Saklar Engkel Buah - 7,682.95
5 Saklar Tripel Buah - 29,792.40
6 Spul Contactor Buah - 99,039.60
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

7 Sekring 63 A Buah - 16,137.55


8 Solder Pistol Buah - 545,254.60
9 Solder Buah - 37,173.40
10 Solar Seal / Photo Seal Buah - 223,006.85
5 Stop Kontak Buah - 7,481.65
6 Steker Arde Buah - 14,896.20
7 Steker T Buah - 17,345.35
8 Steker PH Buah - 5,032.50
9 Sadel No. 6 Bungkus - 1,744.60
10 Sadel No. 8 Bungkus - 2,348.50
11 Sadel No. 9 Bungkus - 2,583.35
12 Sadel No. 10 Bungkus - 6,877.75
13 Sadel No. 12 Bungkus - 8,857.20
14 Sadel No. 14 Bungkus - 5,032.50
15 Sadel No. 19 Bungkus - 7,481.65
16 Sadel No. 22 Bungkus - 14,963.30
17 Skun RS-16 Buah - 1,744.60
18 Stater Buah - 5,032.50
19 Ston 63 A Buah - 223,073.95
20 Stost 40 A + Ip Buah - 94,241.95
21 Stost 32 A + Ip Buah - 61,966.85
22 Tedus Hitam Buah - 1,274.90
23 Tali Tester Buah - 37,173.40
24 Tang Amper Buah - 1,610,970.35
25 Tang Buaya Buah - 49,586.90
26 Tang Potong Buah - 49,586.90
27 Tang Kombinasi Buah - 49,586.90
28 Tang Jepit Buah - 49,586.90
29 Tang Skun Buah - 495,667.70
30 Time Swicht Theben Buah - 1,057,764.40
31 Taping Buah - 817,881.90
32 Taping Conector 1 baut Buah - 19,123.50
33 Taping Conector 2 baut Buah - 31,167.95
34 Tespen Buah - 12,379.95
35 Timah Solder Buah - 37,173.40
36 Terminal 25 ml Buah - 61,966.85
37 Tolkit Buah - 111,520.20
Harga Bahan
No Uraian Bahan Satuan Kode
Wilayah I

38 Wedge Klem Buah - 7,481.65


39 Wide Klem Buah - 11,474.10
40 WD 40 Buah - 61,966.85
41 Klem Tiang uk. 5" s/d 8" x 2" Set - 343,853.95

Kepala Dinas Cipta Karya, Tata Ruang dan Kebersihan


REKAP
ANALISA BIAYA KONSTRUKSI STAND

Propinsi
Kabupaten
Tahun

NO KODE ANALISA
1 2
A. PEKERJAA
1 P. Ps. 01
2 P. Ps. 02
3 P. Ps. 03
4 P. Ps. 04
B. PEKERJ
1 P. T. 01
2 P. T. 02
3 P. T. 03
4 P. T. 04
5 P. T. 05
6 P. T. 06
7 P. T. 07
8 P. T. 08
9 P. T. 09
10 P. T. 10
11 P. T. 11
12 P. T. 12
13 P. T. 13
C. PEKERJAAN
1 P. PB. 01
2 P. PB. 02
3 P. PB. 03

D. PEKERJAAN BE
1 P. BB. 01
2 P. BB. 02
3 P. BB. 03
4 P. BB. 03.a
5 P. BB. 04
6 P. BB. 04.a
7 P. BB. 05
8 P. BB. 06
9 P. BB. 06.a
10 P. BB. 07

Rekapitulasi 362
NO KODE ANALISA
1 2
11 P. BB. 08
12 P. BB. 09
13 P. BB. 09.a
14 P. BB. 10
15 P. BB. 11
16 P. BB. 11.a
17 P. BB. 12
18 P. BB. 12.a
19 P. BB. 13
20 P. BB. 13.a
21 P. BB. 14
22 P. BB. 15
23 P. BB. 16
24 P. BB. 17
25 P. BB. 18
26 P. BB. 19
27 P. BB. 20
28 P. BB. 21
29 P. BB. 22
30 P. BB. 23
31 P. BB. 24
32 P. BB. 25
E. PEKERJA
1 P. Dnd. 01
2 P. Dnd. 02
3 P. Dnd. 03
4 P. Dnd. 04
5 P. Dnd. 05
6 P. Dnd. 06
F. PEKERJAA
1 P. Pls. 01
2 P. Pls. 02
3 P. Pls. 03
4 P. Pls. 04
5 P. Pls. 05
6 P. Pls. 06
7 P. Pls. 07
8 P. Pls. 08

Rekapitulasi 363
NO KODE ANALISA
1 2
G. PEKERJ
1 P. K. 01

2 P. K. 02

3 P. K. 03

4 P. K. 04

5 P. K. 05
6 P. K. 06
7 P. K. 07
8 P. K. 08
9 P. K. 09
10 P. K. 10
11 P. K. 11
12 P. K. 12
13 P. K. 12.a
14 P. K. 13
15 P. K. 14
16 P. K. 15
17 P. K. 16
18 P. K. 17
19 P.K. 18
20 P. K. 19
21 P. K. 20
22 P. K. 21
23 P. K. 22
24 P. K. 23
25 P. K. 24
26 P. K. 25
27 P. K. 26
28 P. K. 27
29 P. K. 28
30 P. K. 29
31 P. K. 30
32 P. K. 30.a
33 P. K. 31
34 P. K. 32
35 P. K. 33
36 P. K. 34
37 P. K. 35
38 P. K. 36
39 P. K. 37

Rekapitulasi 364
NO KODE ANALISA
1 2
40 P. K. 38
41 P. K. 39
42 P. K. 40
43 P. K. 41
44 P. K. 42
45 P. K. 43
46 P. K. 44
47 P. K. 45
48 P. K. 46
50 P. K. 47
49 P. K. 47.a
51 P. K. 48
52 P. K. 49
53 P. K. 50
54 P. K. 51
H. PEKERJAAN
1 P. PA. 01
2 P. PA. 02
3 P. PA. 03
4 P. PA. 04
5 P. PA. 05
6 P. PA. 06
7 P. PA. 07
8 P. PA. 08
9 P. PA. 09
10 P. PA. 10
11 P. PA. 11
12 P. PA. 12
13 P. PA. 13
14 P. PA. 14
15 P. PA. 15
16 P. PA. 16
17 P. PA. 17
18 P. PA. 18
19 P. PA. 19
20 P. PA. 20
21 P. PA. 21

Rekapitulasi 365
NO KODE ANALISA
1 2
I. PEKERJAA
1 P. Pf. 01
2 P. Pf. 02
3 P. Pf. 03
4 P. Pf. 04
5 P. Pf. 05
6 P. Pf. 06
J. PEKERJA
1 P. Snt. 01
2 P. Snt. 02
3 P. Snt. 03
4 P. Snt. 04
5 P. Snt. 05
6 P. Snt. 06
7 P. Snt. 07
8 P. Snt. 08
9 P. Snt. 09
10 P. Snt. 10
11 P. Snt. 11
12 P. Snt. 12
13 P. Snt. 13
14 P. Snt. 14
15 P. Snt. 15
K. PEKERJAAN BE
1 P. BA. 01
2 P. BA. 02
3 P. BA. 03
4 P. BA. 04
5 P. BA. 05
6 P. BA. 06
7 P. BA. 07
8 P. BA. 08
9 P. BA. 09
10 P. BA. 10
11 P. BA. 11
12 P. BA. 12
13 P. BA. 13
L. PEKERJAAN K
1 P. KK. 01
2 P. KK. 02
3 P. KK. 03
4 P. KK. 04
5 P. KK. 04.a
6 P. KK. 05
7 P. KK. 06
8 P. KK. 07

Rekapitulasi 366
NO KODE ANALISA
1 2
9 P. KK. 07.a
10 P. KK. 08
11 P. KK. 09
12 P. KK. 10
13 P. KK. 11
14 P. KK. 12
M. PEKERJAAN PENUTU
1 P. LD. 01
2 P. LD. 02
3 P. LD. 03
4 P. LD. 04
5 P. LD. 04.a
6 P. LD. 05
7 P. LD. 05.a
8 P. LD. 06
9 P. LD. 07
10 P. LD. 08
11 P. LD. 09
12 P. LD. 10
13 P. LD. 11
14 P. LD. 12
15 P. LD. 13
N. PEKERJAAN
1 P. Ct. 01
2 P. Ct. 02
3 P. Ct. 03
4 P. Ct. 04
5 P. Ct. 05
6 P. Ct. 06
7 P. Ct. 07
8 P. Ct. 08
9 P. Ct. 09
10 P. Ct. 10
11 P. Ct. 11

12 P. Ct. 12
13 P. Ct. 13
14 P. Ct. 14
15 P. Ct. 15

Rekapitulasi 367
NO KODE ANALISA
1 2
O. PEKERJAAN
1 P. Bkr. 01
2 P. Bkr. 02
3 P. Bkr. 03
4 P. Bkr. 04
5 P. Bkr. 05
6 P. Bkr. 06
7 P. Bkr. 07

Rekapitulasi 368
REKAPITULASI
ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (ABK-SNI)

: KALIMANTAN BARAT
: KUBU RAYA
: 2012

URAIAN PEKERJAAN
3
A. PEKERJAAN PERSIAPAN
1m1 Pembuatan Pagar Sementara dari Seng Gelombang Tinggi 2 meter (P.Ps. 01)
1m1 Pengukuran dan Pemasangan Bouwplank (P.Ps. 02)
1m2 Membersihkan Lapangan dan Perataan (P.Ps. 03)
1m2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja (P.Ps. 04)
B. PEKERJAAN TANAH
Menggali 1m3 Tanah Biasa sedalam 1 meter (P.T. 01)
Menggali 1m3 Tanah Biasa sedalam 2 meter (P.T. 02)
Menggali 1m3 Tanah Biasa sedalam 3 meter (P.T. 03)
Menggali 1m3 Tanah Keras sedalam 1 meter (P.T. 04)
Menggali 1m3 Tanah Cadas sedalam 1 meter (P.T. 05)
Menggali 1m3 Tanah Lumpur sedalam 1 meter (P.T. 06)
Membuang 1m3 Tanah sejauh 30 meter (P.T. 07)
Mengerjakan 1m2 Stripping Tebing setinggi 1 meter (P.T. 08)
Mengurug Kembali 1m3 Galian (P.T. 09)
1m3 Menimbun dengan Tanah Peladis (P.T. 10)
1m3 Menimbun dengan Tanah Peniraman (P.T. 11)
Memadatkan 1m3 Tanah (per 20 cm) (P.T. 12)
Mengurug 1m3 Pasir Urug (P.T. 13)
C. PEKERJAAN PONDASI BATU
Memasang 1m3 Pondasi Batu Belah, Campuran 1Pc : 3Ps (P.PB. 01)
Memasang 1m3 Pondasi Batu Belah, Campuran 1Pc : 4Ps (P.PB. 02)
Memasang 1m3 Pondasi Siklop, 60% Beton Campuran 1 PC : 2 PB : 3 KR
dan 40% Batu Belah (P.PB. 03)
D. PEKERJAAN BETON BERTULANG
Membuat 1m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87 (P.BB. 01)
Membuat 1m3 Beton Mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87 (P.BB. 02)
Membuat 1m3 Beton Mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 (P.BB. 03)
Membeli dan Mengerjakan 1m3 Beton Ready Mix K 175 (P.BB. 03.a)
Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (P.BB. 04)
Membeli dan Mengerjakan 1m3 Beton Ready Mix K 225 (P.BB. 04.a)
Membuat 1m3 Beton Mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 (P.BB. 05)
Membuat 1m3 Beton Mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 (P.BB. 06)
Membeli dan Mengerjakan 1m3 Beton Ready Mix K 300 (P.BB. 06.a)
Pembesian 10Kg dengan Besi Polos atau Ulir (P.BB. 07)

Rekapitulasi 369
URAIAN PEKERJAAN
3
Memasang 10Kg Jaring Kawat Baja/Wire Mesh (P.BB. 08)
Memasang 1m2 Bekisting untuk Pondasi (P.BB. 09)
Memasang 1m2 Bekisting untuk Pondasi (P.BB. 09.a)
Memasang 1m2 Bekisting untuk Sloof (P.BB. 10)
Memasang 1m2 Bekisting untuk Kolom (P.BB. 11)
1m2 Pasang Bekisting untuk Kolom (P.BB. 11.a)
Memasang 1m2 Bekisting untuk Balok (P.BB. 12)
1m2 Pasang Bekisting untuk Balok (P.BB. 12.a)
Memasang 1m2 Bekisting untuk Lantai (P.BB. 13)
1m2 Pasang Bekisting untuk Lantai (P.BB. 13.a)
Memasang 1m2 Bekisting untuk Tangga (P.BB. 14)
Memasang 1m2 Jembatan untuk Pengecoran Beton (P.BB. 15)
Membuat 1m3 Pondasi Beton Bertulang (150 kg besi + bekisting) (P.BB. 16)
Membuat 1m3 Sloof Beton Bertulang (200 kg besi + bekisting) (P.BB. 17)
Membuat 1m3 Kolom Beton Bertulang (300 kg besi + bekisting) (P.BB. 18)
Membuat 1m3 Balok Beton Bertulang (200 kg besi + bekisting) (P.BB. 19)
Membuat 1m3 Kolom Beton Bertulang (150 kg besi + bekisting) (P.BB. 20)
Membuat 1m3 Dinding Beton Bertulang (150 kg besi + bekisting) (P.BB. 21)
Membuat 1m3 Dinding Beton Bertulang (200 kg besi + bekisting) (P.BB. 22)
Membuat 1m' Kolom Praktis Beton Bertulang (11 x 11) cm (P.BB. 23)
Membuat 1m' Ring Balok Beton Bertulang (10 x 15) cm (P.BB. 24)
Membuat 1m3 Beton Mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78 (P.BB. 25)
E. PEKERJAAN DINDING
1m2 Pasang Batako uk. 15/30/7(P.Dnd. 01)
1m2 Pasang Batako uk. 20/40/9 (P.Dnd. 02)
1m2 Pasang Batako uk. 20/40/7(P.Dnd. 03)
Memasang 1m2 Dinding Bata Merah ukuran (5x11x22) cm tebal 1 Bata campuran 1Pc : 4Ps (P.Dnd. 04)
Memasang 1m2 Dinding Bata Merah ukuran (5x11x22) cm tebal 1/2 Bata campuran 1Pc : 4Ps (P.Dnd. 05)
Memasang 1m2 Dinding Terawang (roster) ukuran (18x18) cm, campuran 1Pc : 4Ps (P.Dnd. 06)
F. PEKERJAAN PLASTERAN
Memasang 1m2 Plesteran 1PC : 2PP, tebal 15 mm (P.Pls. 01)
Memasang 1m2 Plesteran 1PC : 4PP, tebal 15 mm (P.Pls. 02)
Memasang 1m2 Plesteran 1PC : 2PP, tebal 20 mm (P.Pls. 03)
Memasang 1m2 Plesteran 1PC : 4PP, tebal 20 mm (P.Pls. 04)
Memasang 1m2 Berapen 1PC : 5PP, tebal 15mm (P.Pls. 05)
Memasang 1m2 Plesteran Skoning 1PC : 2PP (P.Pls. 06)
Memasang 1m2 Acian (P.Pls. 07)
Memasang 1m2 Plesteran 1PC : 3PP, tebal 15 mm (P.Pls. 08)

Rekapitulasi 370
URAIAN PEKERJAAN
3
G. PEKERJAAN KAYU
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan
Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 9/9 (P.K. 01)
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan
Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 10/10 (P.K. 02)
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau,
Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian
Uk. 12/12 - 15/15 (P.K. 03)
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau,
Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian
Uk. 18/18 - 20/20 (P.K. 04)
1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 7/7 (P.K. 05)
1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 8/8 (P.K. 06)
1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 7/7 (P.K. 07)
1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 8/8 (P.K. 08)
1m1 Melancip Tiang / Batang (P.K. 09)
Membuat Puting dan Lobang / Pasang (P.K. 10)
1 m1 Memancang Tiang ke Dalam Tanah (P.K. 11)
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I (P.K. 12)
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela Kayu Belian (P.K. 12.a)
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas II (P.K. 13)
Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas I (P.K. 14)
Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas II (P.K. 15)
Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas I (P.K. 16)
Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas II (P.K. 17)
Membuat 1m2 Daun Pintu Kayu Lapis (Plywood) Rangkap, Rangka Tertutup Kayu Kelas II
(Lebar sampai 90 cm) (P.K. 18)
Membuat 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I (P.K. 19)
Membuat 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas II (P.K. 20)
Membuat 1m2 Jalusi Kusen, Kayu Kelas I (P.K. 21)
Membuat 1m2 Jalusi Kusen, Kayu Kelas II (P.K. 22)
1m2 Pemasangan Ventilasi Kaca
Setiap luas 1 m2 bidang daun ventilasi, luas kacanya adalah 0.60 m2 (P.K. 23)
Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas I Bentang 6 m (P.K. 24)
Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas II Bentang 6 m (P.K. 25)
Memasang 1m3 Konstruksi Kuda-kuda Expose, Kayu Kelas I (P.K. 26)
Memasang 1m3 Konstruksi Gordeng, Kayu Kelas II (P.K. 27)
Memasang 1m2 Rangka Atap Genteng Keramik, Kayu Kelas II (P.K. 28)
Memasang 1m2 Rangka Atap Genteng Beton, Kayu Kelas II (P.K. 29)
Memasang 1m3 Konstruksi Gordeng, Kayu Kelas I (P.K. 30)
Memasang 1m3 Konstruksi Gordeng, Kayu Belian (P.K. 30.a)
Memasang 1m2 Rangka Atap Sirap, Kayu Kelas II (P.K. 31)
1m2 Pemasangan Rangka Atap Seng (P.K. 32)
1m2 Pasang Kasau + Reng Atap Genteng Metal Kayu Kelas II (P.K. 33)
Memasang 1m2 Rangka Langit-langit (50 x 100) cm, Kayu Kelas II atau III (P.K. 34)
Memasang 1m2 Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III (P.K. 35)
1m2 Pasang Rangka Langit-langit (30 x 60)cm Kayu Kelas II (P.K. 36)
1m2 Pasang Rangka Langit-langit (30 x 30)cm Kayu Kelas II (P.K. 37)

Rekapitulasi 371
URAIAN PEKERJAAN
3
Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas I (P.K. 38)
Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas II (P.K. 39)
1m1 Pasang Lisplank Ukuran 2 x (3 x 20cm) Kayu Kelas I (P.K. 40)
1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Belian (P.K. 41)
1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas I (P.K. 42)
1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas II (P.K. 43)
1m2 Pasang Rangka Dinding Pemisah Kayu Kelas I (P.K. 44)
Memasang 1m2 Rangka Dinding Pemisah (60x120) cm Kayu Kelas II (P.K. 45)
Memasang 1m2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas II (P.K. 46)
Memasang 1m2 Dinding Lambriziring dari Papan Kayu Kelas I (P.K. 47)
Memasang 1m2 Dinding Lambriziring dari Papan Kayu Belian (P.K. 47.a)
Memasang 1m2 Dinding Lambriziring dari Plywood ukuran (120 x 240) cm (P.K. 48)
1m1 Pasang List Plafond, Kayu Profil (P.K. 49)
1m2 Pemasangan Lantai Papan Kayu Belian (P.K. 50)
1m2 Pemasangan Lantai Papan Kayu Kelas I (P.K. 51)
H. PEKERJAAN PENUTUP ATAP
1m2 Pasang Atap Genteng Metal Type PRIMA 0.35 (P.PA. 01)
1m2 Pasang Atap Genteng Metal Type ROYAL 0.35 (P.PA. 02)
1m2 Pasang Atap Genteng Metal Type CLASSIC 0.35 (P.PA. 03)
1m2 Pasang Atap Genteng Metal Stone Type CLASSIC 0.35 (P.PA. 04)
1m2 Pasang Atap Genteng Metal Stone Type PRIMA 0.35 (P.PA. 05)
1m2 Pasang Atap Sirap Belian (P.PA. 06)
1m1 Pekerjaan Bubungan dengan Seng Datar Color 0.35 / 10 m1 (P.PA. 07)
1m1 Pasang Nok / Bumbungan Genteng Metal 1/2 Lingkaran 0.35 (P.PA. 08)
1m1 Pasang Nok / Bumbungan Genteng Metal Kotak 0.35 (P.PA. 09)
1m1 Pasang Nok / Bumbungan Genteng Metal Stone Kotak 0.35 (P.PA. 10)
1m1 Pasang Bumbungan Atap Sirap (P.PA. 11)
1m2 Pasang Atap Seng Gelombang BJLS 30 (P.PA. 12)
1m2 Pasang Atap Metal Supersheet 0.35 (polos) (P.PA. 13)
1m2 Pasang Spandek 0.20
1m2 Pasang Zincalume Gelombang Persegi 0.30 (Colour) (P.PA. 15)
1m2 Pasang Zincalume Gelombang Persegi 0.35 (Polos) (P.PA. 16)
1m2 Pasang Zincalume Gelombang Persegi 0.35 (Colour) (P.PA. 17)
1m1 Pekerjaan Bubungan Atap Seng BJLS 30 / 10m1 (P.PA. 18)
1m2 Pasang Aluminium Foil / Sealation (P.PA. 19)
1m2 Pasang Atap Steel Sheet 0.33 (color) (P.PA. 20)
1m2 Pasang Atap Steel Sheet 0.40 (polos) (P.PA. 21)

Rekapitulasi 372
URAIAN PEKERJAAN
3
I. PEKERJAAN PLAFOND
Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm (P.Pf. 01)
Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm (P.Pf. 02)
Memasang 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm (P.Pf. 03)
Memasang 1 m' list langit-langit kayu profil (P.Pf. 04)
1m2 Langit-langit GRC (P.Pf. 05)
1m2 Pekerjaan Plafond Renglat Kayu Kelas I (P.Pf. 06)
J. PEKERJAAN SANITASI
Pemasangan 1 Buah Kloset Duduk / Monoblok (P.Snt. 01)
Pemasangan Kloset Jongkok Keramik (P.Snt. 02)
Memasang 1m1 Pipa Galvanis Ø 1/2" (P.Snt. 03)
Memasang 1m1 Pipa Galvanis Ø 3/4" (P. Snt. 04)
Memasang 1m1 Pipa Galvanis Ø 1" (P.Snt. 05)
Memasang 1m1 Pipa Galvanis Ø 11/2" (P.Snt. 06)
Memasang 1m1 Pipa Galvanis Ø 3" (P.Snt. 07)
Memasang 1m1 Pipa Galvanis Ø 4" (P.Snt. 08)
Memasang 1m1 Pipa PVC Tipe AW Ø 1/2" (P.Snt. 09)
Memasang 1m1 Pipa PVC Tipe AW Ø 3/4" (P.Snt. 10)
Memasang 1m1 Pipa PVC Tipe AW Ø 1" (P.Snt. 11)
Memasang 1m1 Pipa PVC Tipe AW Ø 2" (P.Snt. 12)
Memasang 1m1 Pipa PVC Tipe AW Ø 3" (P.Snt. 13)
Memasang 1m1 Pipa PVC Tipe AW Ø 4" (P.Snt. 14)
Memasang 1 Buah Kran Air Ø 3/4" atau Ø 1/2" (P.Snt. 15)
K. PEKERJAAN BESI DAN ALUMINIUM
Memasang 1 kg besi profil (P.BA 01)
Memasang 1 Kg rangka kuda-kuda baja IWF (P. BA 02)
Mengerjakan 100 kg pekerjaan perakitan (P. BA 03)
Mengerjakan 10 cm pengelasan dengan las listrik (P. BA 04)
Memasang 1m kusen pintu alluminium (P. BA 05)
Memasang 1m' talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm (P. BA 06)
1m2 Pasang Kawat Harmonika (P.BA. 07)
1m2 Pasang Kawat Kassa (P.BA. 08)
1m2 Pasang Jendela Nako (P.BA. 09)
1m2 Pasang Talang Datar Seng BJLS 30 / Talang Sembunyi (P.BA. 10)
1m2 Pasang Talang Miring Seng BJLS 30 / Jurai Dalam (P.BA. 11)
10m1 Talang Cucuran Atap 1/2 Lingkaran Ø 15cm BJLS 30 (P.BA. 12)
10m1 Pemasangan Pipa Pembuangan dari Talang Atap Ø 8cm BJLS 30 (P.BA. 13)
L. PEKERJAAN KUNCI DAN KACA
1 Buah Pemasangan Kunci Tanam Antik (P.KK. 01)
1 Buah Pemasangan Kunci Tanam Biasa (P.KK. 02)
1 Buah Pemasangan Kunci Silinder (P.KK. 03)
1 Buah Pemasangan Engsel Pintu (P.KK. 04)
1 Buah Pemasangan Engsel Jendela (P.KK. 04.a)
1 Buah Pemasangan Kait Angin (P.KK. 05)
1 Buah Pemasangan Door Closer (P.KK. 06)
1 Buah Pemasangan Slot Pintu (P.KK. 07)

Rekapitulasi 373
URAIAN PEKERJAAN
3
1 Buah Pemasangan Slot Jendela (P.KK. 07.a)
1 Buah Pemasangan Door Stoper (P.KK. 08)
1 m2 Pemasangan Kaca Tebal 5mm (P.KK. 09)
1 m2 Pemasangan Kaca Tebal 12mm (P.KK. 10)
1 m2 Pemasangan Kaca Cermin, Tebal 3mm (P.KK. 11)
1 m2 Pemasangan Kaca Patri (P.KK. 12)
M. PEKERJAAN PENUTUP LANTAI DAN DINDING
Memasang 1m2 Lantai Keramik ukuran (20 x 20) cm (P.LD. 01)
Memasang 1m2 Lantai Keramik ukuran (30 x 30) cm (P.LD. 02)
1m2 Pasang Lantai Keramik 40 x 40cm Polos (P.LD. 03)
1m2 Pasang Lantai Keramik 40 x 40cm Polished (setaraf Indogress) (P.LD. 04)
1m2 Pasang Lantai Keramik 40 x 40cm Polished (setaraf Decogress) (P.LD. 04.a)
1m2 Pasang Lantai Keramik 40 x 40cm Unpolished (setaraf Indogress) (P.LD. 5)
1m2 Pasang Lantai Keramik 40 x 40cm Unpolished (setaraf Decogress) (P.LD. 05.a)
Memasang 1 m2 lantai marmer ukuran (100 x 100) cm (P.LD. 06)
Memasang 1 m2 dinding keramik ukuran (20 x 20) cm (P.LD. 07)
1m2 Pasang Dinding Keramik 20 x 25cm (P.LD. 08)
1m2 Pasang Dinding Keramik 30 x 30cm (P.LD. 09)
1m2 Pasang Dinding Keramik 40 x 40cm (P.LD. 10)
Memasang 1 m2 Floor Hardener (P.LD. 11)
1m2 Pemasangan Paving Block (P.LD. 12)
1m2 Pemasangan Paving Stone (P.LD. 13)
N. PEKERJAAN PENGECATAN
1m2 Mengikis / Mengerok Permukaan Cat Tembok Lama (P.Ct. 01)
1m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual (P.Ct. 02)
1m2 Pengecatan Bidang Kayu Lama (P.Ct. 03)
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.Ct. 04)
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 3Lapis Cat Penutup) (P.Ct. 05)
1m2 Pelaburan Bidang Kayu dengan Teak Oil (P.Ct. 06)
1m2 Pelaburan Bidang Kayu dengan Politur (P.Ct. 07)
1m2 Pekerjaan Melamic (P.Ct. 08)
1m2 Pelaburan Bidang Kayu Dengan Cat Residu dan Ter (P.Ct. 09)
1m2 Pelaburan Bidang Kayu Dengan Vernis (P.Ct. 10)
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 11)
1m2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Dengan Cat Mutu Baik. (P.Ct. 12)
1m2 Pengecatan Permukaan Baja dengan Meni Besi (P.Ct. 13)
1m2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah (P.Ct. 14)
1m2 Pengecatan Atap Seng (P.Ct. 15)

Rekapitulasi 374
URAIAN PEKERJAAN
3
O. PEKERJAAN BONGKARAN
1m3 Pekerjaan Bongkaran Beton Bertulang (P.Bkr. 01)
1m2 Pekerjaan Bongkaran Dinding Tembok Plesteran Simpai (P. Bkr. 02)
1m2 Pekerjaan Bongkaran Lantai Ubin / Keramik (P.Bkr. 03)
1m2 Pekerjaan Bongkaran Atap Genteng / Sirap (P.Bkr. 04)
1m2 Pekerjaan Bongkaran Atap Seng (P.Bkr. 05)
1m2 Pekerjaan Bongkaran Rangka Atap Kayu (P.Bkr. 06)
1m3 Pekerjaan Bongkaran Rangka Badan Kayu (P.Bkr. 07)

WALIKOTA PO

Rekapitulasi 375
APITULASI
NDAR NASIONAL INDONESIA (ABK-SNI)

HARGA SATUAN
HAL
(Rp)
4 5
AAN PERSIAPAN

13,953.13
9,249.75

RJAAN TANAH
19,116.15
58,273.43
68,879.81
63,638.28
96,197.40
76,772.93
20,966.10
3,391.58
6,038.03

33,915.75
88,699.90
AN PONDASI BATU

N BETON BERTULANG
746,067.99
894,110.65
1,009,203.91

702,195.04

1,089,979.04
1,123,244.52

8,942.98

Rekapitulasi 376
HARGA SATUAN
HAL
(Rp)
4 5
516.15
32,692.84
77,552.64
12,420.53

20,781.82

42,463.65

247,818.24

3,211,167.58
3,870,262.52

60,789.58
79,660.97
937,036.18
RJAAN DINDING

52,836.39
97,490.25
45,962.63

AAN PLASTERAN
24,681.08
16,001.14
60,968.73
53,956.93
24,328.87
34,117.46
10,366.50
42,440.60

Rekapitulasi 377
HARGA SATUAN
HAL
(Rp)
4 5
ERJAAN KAYU

11,124,577.00

23,432.70
40,698.90
58,180.93

3,449,456.50

168,330.00

311,742.75

290,336.33
147,945.26

34,542.89
36,957.98

41,387.06

Rekapitulasi 378
HARGA SATUAN
HAL
(Rp)
4 5

38,041.13

11,599.29

AN PENUTUP ATAP

97,984.47

59,272.98

Rekapitulasi 379
HARGA SATUAN
HAL
(Rp)
4 5
JAAN PLAFOND

38,092.33

36,674.40

JAAN SANITASI
2,666,254.07
331,720.50

287,918.87

16,752.89

105,601.24

103,529.94
27,758.13
BESI DAN ALUMINIUM

41,398.38

N KUNCI DAN KACA

192,374.13

21,145.95
19,145.95
14,296.00

Rekapitulasi 380
HARGA SATUAN
HAL
(Rp)
4 5
22,861.27

136,145.95

UTUP LANTAI DAN DINDING


113,518.73
105,300.25

153,923.13

248,832.50
AAN PENGECATAN

23,508.08
18,145.69
36,542.20

13,126.62

12,649.71

24,074.78

Rekapitulasi 381
HARGA SATUAN
HAL
(Rp)
4 5
AAN BONGKARAN
431,655.00
64,748.25
3,237.41
924.98
9,249.75
64,748.25
443,988.00

WALIKOTA PONTIANAK

SUTARMIDJI

Rekapitulasi 382
LAMPIRAN II : PERATURAN WALIKOTA PONTIANAK
NOMOR : …………………... TAHUN 2012
TANGGAL : ……………-…………2012

TENTANG
STANDAR HARGA SATUAN UPAH, BAHAN,
ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (ABK-SNI)
DAN ANALISA E KOTA PONTIANAK

( Periode Januari s/d Desember 2012 )

HARGA

TANPA HARGA TERMASUK


NO TENAGA KERJA SATUAN KODE KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

A. UPAH
1 Mandor Lapangan Org/hari L.061 85,000.00 8,500.00 93,500.00
2 Mekanik Org/hari L.071 85,000.00 8,500.00 93,500.00
3 Kepala Tukang Org/hari L.073 85,000.00 8,500.00 93,500.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 78,000.00 7,800.00 85,800.00
5 Operator terlatih Org/hari L.081 70,000.00 7,000.00 77,000.00
6 Operator semi terlatih Org/hari L.082 62,000.00 6,200.00 68,200.00
7 Sopir Org/hari L.091 70,000.00 7,000.00 77,000.00
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 62,000.00 6,200.00 68,200.00
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 70,000.00 7,000.00 77,000.00

WALIKOTA PONTIANAK

SUTARMIDJI
LAMPIRAN III : PERATURAN WALIKOTA PONTIANAK
NOMOR : …………………... TAH
TANGGAL : ……………-…………2

TENTANG
STANDAR HARGA SATUAN UPAH, BAHAN,
ANALISA BIAYA KONSTRUKSI STANDAR NASIONAL INDONESIA (A
DAN ANALISA E KOTA PONTIANAK

( Periode Januari s/d Desember 2012 )

NO MATERIAL SATUAN

B. BAHAN PENGISI
1 Batu Kong M³
2 Batu Sap Pinang M³
3 Batu pecah 15-20 cm M³
4 Batu pecah 10-15 cm M³
5 Batu pecah 5-7 cm M³
6 Batu pecah 3-5 cm M³
7 Batu pecah 2-3 cm M³
8 Batu pecah 1-2 cm M³
9 Batu pecah 1-1 cm M³
10 Batu pecah 0,5 cm M³
11 Stone Dust M³
12 Aspal Kg
13 Pasir M³
14 Semen PC Zak
15 Semen PC Kg
16 Tanah Ex. Peniraman M³
17 Tanah EX. Peladis M³
18 Paving Block Bh
19 Paving Stone Bh
20 Batu Bata 5 x 11 x 22cm Bh
21 Bataco 15 x 30 x 7 cm Bh
22 Bataco 20 x 40 x 9 cm ( press ) Bh
23 Bataco 20 x 40 x 7 cm ( press ) Bh
24 Kerawang ( roster ) 18 x 18 cm Bh
25 Kerawang press ( roster ) 30 x 30 cm Bh
NO MATERIAL SATUAN

26 Keramik 20 x 20 cm Kotak
27 Keramik 30 x 30 cm Kotak
28 Keramik 30 x 30 cm Unpolished Kotak
29 Keramik 30 x 30 cm Artistik Kotak
30 Keramik 40 x 40 cm (biasa) Kotak
31 Keramik 40 x 40 cm Polished (setaraf Indogress) Kotak
32 Keramik 40 x 40 cm Polished (setaraf Decogress) Kotak
33 Keramik 40 x 40 cm Unpolished (setaraf Indogress) Kotak
34 Keramik 40 x 40 cm Unpolished (setaraf Decogress) Kotak
35 Keramik 60 x 60 cm Polished (setaraf Indogress) Kotak
36 Keramik 60 x 60 cm Polished (setaraf Decogress) Kotak
37 Granito 40 x 40 cm Kotak
38 Marmer M²
39 Wood Flooring M²
40 List Keramik WC. 8 x 20 cm Bh
41 Plint Kayu uk. 2 x 10 cm Bh
42 Keramik dinding 20 x 20 cm Kotak
43 Keramik dinding 20 x 25 cm Kotak
44 Floor Hardener Kg
45 Beton Ready Mix B 0 M³
46 Beton Ready Mix 125 M³
47 Beton Ready Mix 175 M³
48 Beton Ready Mix 225 M³
49 Beton Ready Mix 300 M³
50 Additive Ready Mix Liter
51 Karung Goni Curing Beton ( 0.7m² ) Lembar
NO MATERIAL SATUAN

52 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg
53 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg
54 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg
55 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg
56 Papan Turap Uk. 15/50 - 5m - K 300 Kpg
57 Papan Turap Uk. 15/50 - 6m - K 300 Kpg
58 Pemancangan Mini Pile - 6m Btg
59 Sewa Pompa Ready Mix (Min. 100 M³) M³
60 Bahan Plastik Cor Beton M²

C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M M³
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³
8 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M M³
10 Ky. Belian ketam Uk. 6/6 - 4 M M³
11 Ky. Belian ketam Uk. 7/7 - 4 M M³
12 Ky. Belian ketam Uk. 8/8 - 4 M M³
13 Ky. Belian ketam Uk. 5/10 - 4 M M³
14 Ky. Belian ketam Uk. 4/8 - 4 M M³
15 Papan belian ketam (4m) M³
16 Papan belian tdk ketam (4m) M³
17 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³
18 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³
19 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³
20 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³
21 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³
22 Kusen Ky Kelas I Bangkirai uk. 5/10 M³
23 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³
24 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³
25 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³
26 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³
27 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³
28 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³
29 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³
30 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³
31 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³
NO MATERIAL SATUAN

32 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³


33 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³
34 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³
35 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³
36 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³
37 Papan kayu klas II (mabang) tdk ketam M³
38 Papan kayu klas II (mabang) ketam M³
39 Papan kayu klas I tdk ketam M³
40 Papan kayu klas I ketam M³
41 Papan mal klas III M³
42 Papan Simpiran M³
43 Renglat kayu klas I uk 1/8 cm Btg
44 Kayu profil 10cm Btg
45 Kayu cerucuk /dolken ø 4 - 6 - Pj. 4 M Btg
46 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg
47 Kayu cerucuk /dolken ø 8 - 10 - Pj. 4 M Btg
48 Kayu cerucuk /dolken ø12 - Pj. 12 M Btg
49 Kayu cerucuk /dolken ø 15 - Pj. 12 M Btg
50 Kayu Simpiran / Bakar M³
51 Alas laci Btg
52 Wood Plank M'

D. BAHAN CAT
1 Amplas Lbr
2 Minyak cat Kg
3 Cat kilat Kg
4 Plamur Kg
5 Cat dasar Kg
6 Cat tembok Kg
NO MATERIAL SATUAN

7 Cat tembok type weather shield Kg


8 Cat tembok type weather coat (acrylic) Kg
9 Cat seng Kg
10 Dempul Kg
11 Plitur Kg
12 Thiner Ltr
13 Thiner ND Ltr
14 Melamic Ltr
15 Vernis Ltr
16 Meni Kg
17 Oker Kg
18 Lem Kayu Kg
19 Sealent Tube
20 Soda Api Kg
21 Sabun / cream pembersih kotoran Kg
22 Teak Oil Ltr
23 Ter / Residu Ltr
24 Kuas 4" Bh
25 Road Line Paint ( Cat Marka ) Ltr
26 Glass Bit Kg
27 Weatherbond Emulsion ( cat kerb ) Kg
28 Termoplast Kg
29 Water Proofing M²

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton Kg
2 Besi wire mesh ø 5 Kg
3 Kawat baja/bendrat Kg
4 Simpai roll Kg
5 Kawat simpai Kg
6 Baut dia 4/8 " pj = 20 cm Btg
7 Besi Penahan bh
8 Beugel plat L. 3 cm bh
9 Plat 1,2 x 2,4 x 12 Bh
10 Besi Konstruksi (I, H) Kg
11 Besi Konstruksi ( C ) Kg
12 Besi Konstruksi (siku ) Kg
13 Kawat Las Btg
14 Kawat Las Kg
15 Kawat harmonika M²
16 Kawat kasa M²
17 Pipa galvanis dia 3/4" Btg
NO MATERIAL SATUAN

18 Pipa galvanis dia 1/2" Btg


19 Pipa galvanis dia 1" Btg
20 Pipa galvanis dia 1 1/4" Btg
21 Pipa galvanis dia 1 1/2" Btg
22 Pipa galvanis dia 2" Btg
23 Pipa galvanis dia 3" Btg
24 Pipa galvanis dia 4" Btg
25 Folding gate M²
26 Rangka Aluminium 1 1/2" x 3" Meter
27 Rangka Aluminium 1 3/4" x 4" Meter
28 Pintu Aluminium std IKP, lengkap 4" Unit
29 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m) M²
30 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) M²
31 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m) M²
32 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) M²
33 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) M²
34 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) M²
35 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m) M²
36 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) M²
37 Alumunium Komposit + Rangka Besi M²
38 Rangka Plafond Metal Furing + Pemasangan M²
NO MATERIAL SATUAN

F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC Bh
2 Kait angin Bh
3 Handle Jendela Bh
4 Handle Pintu Bh
5 Engsel jendela Bh
6 Engsel pintu Bh
7 Slot pintu Bh
8 Slot jendela Bh
9 Kunci tanam 2 slag (setaraf Belluci) Bh
10 Kunci tanam 1 slag Bh
11 Kunci tanam antik Bh
12 Kunci tanam biasa Bh
13 Kunci silinder Bh
14 Door Closer Bh
15 Door Stoper Bh
16 Paku Seng Kg
17 Paku campuran 1" - 5 " Kg
18 Paku beton Kg
19 Paku Atap Seng Kg
20 Paku triplek Kg
21 Paku GRC Kg
22 Sekrup Gypsum Kg
23 Sekrup Fixer Bh
24 Sekrup Steel Sheet Bh
25 Sekrup Zincalume Bh
26 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm Unit
27 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm Unit
28 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm Unit
29 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca) Unit
30 Kusen Alumunium M'

G. BAHAN ATAP
1 Sirap belian Lbr
2 Asbes Lbr
3 Eternit M²
4 Genteng Metal Type Prima 0.35 Lbr
5 Genteng Metal Type Royal 0.35 Lbr
6 Genteng Metal Type Classic 0.35 Lbr
7 Genteng Metal Stone ( Type Classic 0.35 ) Lbr
8 Genteng Metal Stone ( Type Prima 0.35 ) Lbr
9 Atap Metal Supersheet 0.35 (polos) M'
NO MATERIAL SATUAN

10 Atap Metal Supersheet 0.35 (polos) M²


11 Atap Trim Deck 0.3 (polos) M²
12 Atap Trim Deck 0.33 (color) M²
13 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh
14 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh
15 Nok bubungan genteng metal kotak 0.35 M'
16 Nok bubungan genteng metal stone kotak 0.35 M'
17 Nok bubungan Trim Deck (polos) M'
18 Nok bubungan Trim Deck (color) M'
19 Nok bubungan Steel Sheet 0.33 (color) (pj 50 cm) M'
20 Nok bubungan Steel Sheet 0.43 (color) (pj 50 cm) M'
21 Nok bubungan Steel Sheet 0.35 (polos) (pj 50 cm) M'
22 Nok bubungan Steel Sheet 0.40 (polos) (pj 50 cm) M'
23 Seng Gelombang Bjls 30 Lbr
24 Seng Gelombang Bjls 20 Lbr
25 Seng Plat Bjls 20 Lbr
26 Seng Plat Bjls 30 Lbr
27 Seng Plat Bjls 30 (lebar 45 cm) M'
28 Plat Datar Color 0.35 Lbr
29 Zincalume Gelombang Persegi 0.35 (polos) M²
30 Zincalume Gelombang Persegi 0.30 (polos) M²
31 Zincalume Gelombang Persegi 0.35 (color) M²
32 Zincalume Gelombang Persegi 0.30 (color) M²
33 Zincalume Plat 0.2 Lbr
34 Aluminium Foil M²
NO MATERIAL SATUAN

35 Atap Steel Sheet 0.33 (color) M²


36 Atap Steel Sheet 0.40 (polos) M²
37 Papan Belian utk Atap uk. 1/15 pj. 50 cm Lbr

H. BAHAN KACA
1 Kaca Polos, t = 5 mm M²
2 Kaca Polos, t = 12mm M²
3 Kaca Rayben, t = 5 mm M²
4 Kaca Cermin t = 3mm M²
5 Kaca Patri M²
6 Sealent Kg
7 Nako + Bingkai (80 x 15) x 10 daun polos Bh
8 Nako + Bingkai (80 x 15) x 10 daun rayben Bh
9 Kaca Es M²
10 Kaca Polos, t = 8 mm M²
11 Kaca Raindown, t = 5 mm M²
12 Kaca Buram, t = 5 mm M²

I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr
2 Triplek t = 6 mm Lbr
3 Triplek t =9 mm Lbr
4 Multiplek t = 10 mm Lbr
5 Multiplek t = 12 mm Lbr
6 Plywood 4' x 8' x 4mm Lbr
7 Panel GRC 120 x 240 x 40 Lbr
8 GypsumBoard t = 9mm Lbr

J. BAHAN SANITASI
1 Kloset duduk monoblok Bh
2 Kloset duduk putih (setaraf TOTO) Bh
3 Kloset duduk warna (setaraf TOTO) Bh
4 Kloset jongkok (setaraf TOTO) Bh
5 Kloset jongkok (setaraf INA) Bh
6 Kran air uk 1/2" Bh
7 Pipa paralon dia 1/2" Btg
8 Pipa paralon dia 3/4" Btg
9 Pipa paralon dia 1" Btg
10 Pipa paralon dia 2" Btg
11 Pipa paralon dia 3" Btg
12 Pipa paralon dia 4" Btg
13 Pipa paralon dia 8" Btg
NO MATERIAL SATUAN

K. BAHAN MINYAK (TANPA KEUNTUNGAN)


1 Minyak solar non subsidi Ltr
2 Minyak solar subsidi Ltr
3 Minyak solar industri Ltr
4 Bensin premium Ltr
5 Minyak pelumas Ltr
6 Oli BEO 154W40/Cat Ltr
7 Minyak tanah Ltr
8 Gas Elpiji Kg
9 Alat-alat bantu Set
10 Sewa Alat Untuk Pengelasan Jam
11 Sewa Molen Set
12 Sewa kuali termasuk angkutan Set

L. BAHAN ALAT-ALAT LISTRIK


1 Armatur lampu High Mass Holovent 400 watt (lengkap) Unit
2 Armatur lampu SGP 338 / SONT 400 Watt Unit
3 Armatur lampu SGP 328 / SONT 250 Watt Unit
4 Armatur lampu SGP 338 / SONT 400 Watt (lengkap) Unit
5 Armatur lampu SGP 368 / SONT 250 Watt (lengkap) Unit
6 Armatur lampu LVD 100 Watt (lengkap) Unit
7 Armatur lampu Ekorola TRX 800 - 20 Watt (set) Set
8 Armatur lampu Sorot HPIT 250 Watt (lengkap) Set
9 Sorot HPIT 250 watt (lengkap) Set
10 XKS SON T 250 watt (lengkap) Set
11 Tiang Artagonal Cabang 2 T = 11 M Tiang
12 Tiang Artagonal Cabang 1 T = 11 M Tiang
13 Tiang Oktagonal Cabang 2 T = 11 M Btg
NO MATERIAL SATUAN

14 Tiang Oktagonal Cabang 1 T = 11 M Btg


15 Tiang high mass 22 m cab. 5 ring Tiang
16 Tiang high mass 22 m cab. 4 ring Tiang
17 Tiang lampu oktagonal 11 m Btg
18 Tiang lampu oktagonal 12 m Btg
19 Tiang lampu oktagonal cab. 4 Ring 12 Mtr Btg
20 Tiang lampu oktagonal cab. 2 (11m) Btg
21 Stang Ornamen Galvanis dia 2" Pj. 7 M + Klem Tiang Btg
22 Stang Ornamen Galvanis dia 2" Pj. 6 M + Klem Tiang Btg
23 Stang Ornamen Galvanis dia 2" Pj. 5 M + Klem Tiang Btg
24 Stang Ornamen Galvanis dia 2" Pj. 3 M + Klem Tiang 12
25 Stang Ornamen Galvanis dia 2" Pj. 2 M + Klem Tiang Btg
26 Box Panel PJU Uk. 60x90x30 Cm lengkap Time Swich Set
27 Box Panel PJU Uk. 50x45x25 Cm lengkap Time Swich Set
28 Box KWH Meter Uk. 35 x 50 x 25 cm Buah
29 Traffo HPL 400 Watt Buah
30 Traffo HPL 250 Watt Buah
31 Traffo HPL 125 Watt Buah
32 Traffo SOX 135 Watt Buah
33 Traffo SOX 180 Watt Buah
34 Traffo SON T 400 Watt Buah
35 Traffo SON T 250 Watt Buah
36 Traffo SON T 125 Watt Buah
37 Traffo SON T 70 Watt Buah
38 Traffo SON H 400 Watt Buah
39 Traffo SON H 250 Watt Buah
40 Traffo SON H 125 Watt Buah
41 Traffo SON H 70 Watt Buah
42 Traffo HPiT 400 Buah
43 Traffo Neon 40 Watt Buah
44 Traffo Neon 20 Watt Buah
45 Traffo Neon 10 Watt Buah
46 Traffo 400 Watt Buah
47 HPL 250 Watt Buah
48 HPL 125 Watt Buah
49 HPL 135 Watt Buah
50 SOX 180 Watt Buah
51 SOX 160 Watt Buah
52 MLL Buah
53 Bola SON T 1000 Watt Buah
54 Bola SON T 400 Watt Buah
55 Bola SON T 250 Watt Buah
NO MATERIAL SATUAN

56 Bola SON T 150 Watt Buah


57 Bola Lampu SON 70 Watt Buah
58 SON H 400 Watt Buah
59 SON H 250 Watt Buah
60 SON H 125 Watt Buah
61 SON H 70 Watt Buah
62 Bola Lampu HPIT 400 Watt Buah
63 HPIT 400 Watt Buah
64 Seri 200 Biji Kotak
65 Seri Kuning Kotak
66 Neon Sen Meter
67 Pijar 5 Watt Buah
68 Pijar 20 Watt Buah
69 Pijar 25 Watt Buah
70 Pijar 40 Watt Buah
71 Pijar 60 Watt Buah
72 Pijar 75 Watt Buah
73 Pijar 80 Watt Buah
74 Pijar 100 Watt Buah
75 Pijar 200 Watt Buah
76 Neon 40 Watt Buah
77 Neon 20 Watt Buah
78 Neon 10 Watt Buah
79 Lampu Ekorola TRX 800 - 20 watt (set) Set
80 Lampu Light Grick Buah
81 Lampu Genite 16 Watt Buah
82 Lampu XL 14 Watt Buah
83 Lampu Sorot 300 Watt Buah
84 Lampu Nepalos 25 Watt Buah
85 Lampu Superlox 25 Watt Buah
86 Lampu Superlox 40 Watt Buah
87 Lampu Fisikom 25 Watt Buah
88 Lampu Fisikom 23 Watt Buah
89 Lampu Fisikom 18 Watt Buah
90 Lampu Mercury 125 Watt Buah
91 Lampu Mercury 250 Watt Buah
92 Lampu Sunyco 45 Watt Buah
93 Lampu Matsuka 8 Watt Buah
94 Lampu Matsuka 14 Watt Buah
95 Lampu Matsuka 18 Watt Buah
96 Lampu Matsuka 20 Watt Buah
97 Lampu Matsuka 25 Watt Buah
NO MATERIAL SATUAN

98 Lampu Par 38 Watt Buah


99 Lampu Taman Buah
100 SL 15 Watt Buah
101 SL 18 Watt Buah
102 SL 25 Watt Buah
103 TL Rina 32 Watt Buah
104 Bola Essetial Buah
105 Bola Spot Light Buah
106 Bola Lampu Sorot 300 Watt Buah
107 Hologen 500 Watt Buah
108 Hologen 1.000 Watt Buah
109 Hologen 1 x 1.5 mm Buah
110 NYY 1 x 2.5 mm Meter
111 NYY 1 x 4 mm Meter
112 NYY 1 x 6 mm Meter
113 NYY 2 mm Meter
114 NYY 2 x 2.5 mm Meter
115 NYY 2 x 4 mm Meter
116 NYY 2 x 6 mm Meter
117 NYY 2 x 10 mm Meter
118 NYY 3 x 4 mm Meter
119 NYY 4 x 2.5 mm Meter
120 NYY 4 x 4 mm Meter
121 NYY 4 x 6 mm Meter
122 NYY 4 x 10 mm Meter
123 NYY 4 x 16 mm Meter
124 NYY 4 x 25 mm Meter
125 NYY 4 x 35 mm Meter
126 NYY 4 x 50 mm Meter
127 NYY 4 x 70 mm Meter
128 NYN 2 x 2,5 mm Meter
129 NYN 3 x 1,5 mm Meter
130 NYN 3 x 2,5 mm Meter
131 NYA 1 x 1,5 mm Meter
132 NYA 1 x 2,5 mm Meter
133 NYA 1 x 4 mm Meter
134 NYA 1 x 6 mm Meter
135 NYF6BY 2 x 2,5 mm Meter
136 NYF6BY 2 x 4 mm Meter
137 NYF6BY 2 x 30 mm Meter
138 NYF6BY 4 x 6 mm Meter
139 NYF6BY 1,5 mm Meter
NO MATERIAL SATUAN

140 NYF6BY 4 mm Meter


141 NYM 10 mm Meter
142 NYM 16 mm Meter
143 NYM Meter
144 NYM Meter
145 NYM Meter
146 NYM Meter
147 NYM Meter
148 NYM Meter
149 NYM 4 mm Meter
150 NYM 3 x 4 mm Meter
151 NYM 2 x 2 mm Meter
152 NYMHYM2 x 4 mm Meter
153 NYMHYM2 x 2,5 mm Meter
154 Traffo S 2 x 1,5 mm Buah
155 Kabel Sn3 x 1,5 mm Roll
156 Kabel Tes3 x 2,5 mm Meter
157 Kabel Bo3 x 10 mm Meter
158 Kabel Mi4 x 2,5 mm Roll
159 Kabel 3 4 x 4 mm Meter
160 Kabel Antena Roll
161 Kabel H / M Meter
162 Kabel Transparan Meter
163 Kabel Telepon Meter
164 Kabel TC 2 x 10 mm Meter
165 Kabel TC 2 x 16 mm Meter
166 Box TL 20 Watt Buah
167 Box MCB 1 Group Buah
168 Cal Gulung Buah
169 Contactor 100 A Buah
170 Conector Buah
171 Dop 3" Buah
172 Esensial Buah
173 Fitting Gantung Buah
174 Fitting Duduk Buah
175 Fitting Atom Buah
176 Fitting Gantung E 27 Buah
177 Fitting Duduk E 27 Buah
178 Fitting Duduk E 40 Buah
179 Fitting Hologen Buah
180 Full Breket Buah
181 Gulung Spul Buah
NO MATERIAL SATUAN

182 Gulung Coil Contactor Buah


183 Isolasi Unibel Buah
184 Icnitor SN 58 Buah
185 Inector Buah
186 Ignator Buah
187 Indiktor Buah
188 Insuluk Buah
189 Kapasitor Buah
190 Kap Hijau E 27 Buah
191 Kap Hijau E 40 Buah
192 Kap Lampu Buah
193 Kap To2 Buah
194 Kop Skring Buah
195 Klem Tiang Buah
196 k. Skum 10-8 Buah
197 MCB 1.A Buah
198 MCB 2.A Buah
199 MCB 25 A Buah
200 MCB 63 A Buah
201 MCB 40 A Buah
202 MCB 45 A Buah
203 MCB 50 A Buah
204 MCB 10 A Buah
205 MCB 16 A Buah
206 MCB 6 A Buah
207 MCB 32 A Buah
208 MCB Box Buah
209 Multi Tester Buah
210 MC Se-3 N Buah
211 Macon Mec gmg-50 aC Buah
212 Magnetic Contactor 100 A Buah
213 NH Fuse 80 A Buah
214 Ornamen Pijar Buah
215 Ornamen Gantung Buah
216 Obeng Plus Buah
217 Obeng Minus Buah
218 Open Steker Buah
219 On - Off Buah
220 Pat 38 Buah
221 Solar Seal / Photo Seal Buah
222 Opstic 1/2" lengkap klem Batang
223 Pipa Paralon 1/2" Batang
NO MATERIAL SATUAN

224 Pipa L 1/2" Batang


225 Pipa Paralon 1' Batang
226 Pipa Paralon 3/4" Batang
227 Pipa Paralon 3' Batang
228 Pipa PVC 1,5" Batang
229 Pipa PVC Galvanis 1,5" Batang
230 Pipa Besi Batang
231 Pipa Galvanis Batang
232 Pipa ornamen dia 2" x 2m Batang
233 Pipa ornamen dia 2" x 3m lengkap klem Batang
234 Pipa ornamen dia 2" x 6m lengkap klem Batang
235 Pipa ornamen dia 2" x 7m lengkap klem Batang
236 Pondasi tiang lampu oktagonal (11 meter) Unit
237 Pres Conector Buah
238 Rangka Ring 32 Watt Buah
239 Rel MCB Buah
240 Roset Telpon Buah
241 Saklar Double Buah
242 Saklar Engkel Buah
243 Saklar Tripel Buah
244 Spul Contactor Buah
245 Sekring 63 A Buah
246 Solder Pistol Buah
247 Solder Buah
248 Solar Seal / Photo Seal Buah
249 Stop Kontak Buah
250 Steker Arde Buah
251 Steker T Buah
252 Steker PH Buah
253 Sadel No. 6 Bungkus
254 Sadel No. 8 Bungkus
255 Sadel No. 9 Bungkus
256 Sadel No. 10 Bungkus
257 Sadel No. 12 Bungkus
258 Sadel No. 14 Bungkus
259 Sadel No. 19 Bungkus
260 Sadel No. 22 Bungkus
261 Skun RS-16 Buah
262 Stater Buah
263 Ston 63 A Buah
264 Stost 40 A + Ip Buah
265 Stost 32 A + Ip Buah
266 Tedus Hitam Buah
NO MATERIAL SATUAN

267 Tali Tester Buah


268 Tang Amper Buah
269 Tang Buaya Buah
270 Tang Potong Buah
271 Tang Kombinasi Buah
272 Tang Jepit Buah
273 Tang Skun Buah
274 Time Swicht Theben Buah
275 Taping Buah
276 Taping Conector 1 baut Buah
277 Taping Conector 2 baut Buah
278 Tespen Buah
279 Timah Solder Buah
280 Terminal 25 ml Buah
281 Tolkit Buah
282 Wedge Klem Buah
283 Wide Klem Buah
284 WD 40 Buah
285 Klem Tiang uk. 5" s/d 8" x 2" Set

WALIKOTA PON

SUTARMID
PERATURAN WALIKOTA PONTIANAK
NOMOR : …………………... TAHUN 2012
TANGGAL : ……………-…………2012

TENTANG
RGA SATUAN UPAH, BAHAN,
STANDAR NASIONAL INDONESIA (ABK-SNI)
LISA E KOTA PONTIANAK

anuari s/d Desember 2012 )

HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.101 192,500.00
- 220,000.00
- 259,880.00
M.020 275,000.00
M.022 385,000.00
M.023 330,000.00
M.024 359,700.00
M.025 418,620.00
- 467,500.00
M.026 476,670.00
- 408,540.00
- 10,890.00
M.040 91,300.00
M.080 72,820.00
- 1,460.00
M.050.a 120,000.00
M.050 238,340.00
- 2,640.00
- 4,360.00
- 2,790.00
- 1,040.00
- 2,530.00
- 2,310.00
- 29,700.00
- 45,100.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 52,440.00
- 45,930.00
- 57,750.00
- 64,130.00
- 71,390.00
- 130,170.00
- 113,670.00
- 167,750.00
- 148,500.00
- 308,000.00
- 242,000.00
- 193,470.00
- 499,130.00
- 302,500.00
- 8,800.00
- 60,500.00
- 56,650.00
- 56,830.00
- 9,080.00
- 834,900.00
- 877,250.00
- 943,800.00
- 1,046,650.00
- 1,143,450.00
- 44,000.00
- 12,710.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 1,270,500.00
- 1,669,800.00
- 1,089,000.00
- 1,216,050.00
- 968,000.00
- 1,234,200.00
- 145,200.00
- 60,500.00
- 3,850.00

- 14,513,890.00
- 13,857,640.00
- 11,806,930.00
- 9,227,860.00
M.181.a 14,655,350.00
M.181.b 11,435,420.00
- 11,458,340.00
- 8,107,850.00
- 13,566,670.00
- 16,041,670.00
- 14,057,340.00
- 13,646,880.00
- 18,333,340.00
- 13,893,230.00
M.181.e 16,958,370.00
M.181.d 15,074,070.00
M.181.f 11,733,340.00
M.181.g 11,733,340.00
- 8,983,340.00
- 8,983,340.00
- 11,550,000.00
- 115,500.00
M.181.h 3,646,680.00
M.181.i 3,915,320.00
- 5,219,520.00
- 5,490,840.00
- 2,764,960.00
- 2,716,480.00
- 4,393,890.00
- 3,858,150.00
- 4,094,370.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 5,188,340.00
- 3,807,230.00
- 4,947,360.00
- 2,813,560.00
- 2,436,300.00
M.181.j 6,518,520.00
M.181.k 6,569,450.00
- 9,052,120.00
- 10,388,890.00
M.181.l 1,599,590.00
- 1,159,550.00
- 42,680.00
- 31,900.00
- 5,630.00
- 13,750.00
- 10,450.00
- 80,850.00
- 99,000.00
- 219,620.00
- 16,500.00
- 60,500.00

- 2,840.00
- 28,190.00
- 45,650.00
- 29,520.00
- 47,850.00
- 73,920.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 180,840.00
- 180,680.00
- 194,150.00
- 36,990.00
- 50,160.00
M.090.f 26,090.00
- 32,450.00
- 58,300.00
- 71,370.00
- 65,220.00
- 55,920.00
- 21,520.00
- 137,500.00
- 19,800.00
- 20,350.00
- 48,400.00
- 58,300.00
- 20,680.00
M.090.e 99,000.00
M.090.g 40,170.00
M.090.h 110,000.00
- 41,270.00
- 72,600.00

M.167 15,600.00
- 20,610.00
M.168 19,800.00
- 23,420.00
- 54,380.00
M.163 8,250.00
- 33,000.00
- 42,350.00
- 490,050.00
- 19,730.00
- 20,450.00
- 20,450.00
- 22,550.00
- 126,500.00
- 39,880.00
- 15,130.00
- 148,610.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 121,880.00
- 191,510.00
- 269,830.00
- 312,730.00
- 384,450.00
- 614,350.00
- 837,380.00
- 715,000.00
- 90,750.00
- 116,160.00
- 2,631,750.00
- 205,700.00
- 290,400.00
- 217,800.00
- 326,700.00
- 193,600.00
- 242,000.00
- 205,700.00
- 278,300.00
- 1,045,000.00
- 148,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 302,500.00
- 14,850.00
- 16,500.00
- 162,250.00
- 24,750.00
- 33,000.00
- 20,350.00
- 23,930.00
- 184,250.00
- 187,000.00
- 179,020.00
- 88,550.00
- 110,000.00
- 231,000.00
- 77,000.00
M.166.a 24,530.00
M.166.b 20,900.00
- 27,500.00
M.166.c 27,500.00
- 28,870.00
- 28,870.00
- 96,800.00
- 1,650.00
- 530.00
580.00
- 4,840,000.00
- 2,420,000.00
- 1,815,000.00
- 726,000.00
- 84,700.00

- 6,050.00
- 56,650.00
- 78,650.00
- 69,630.00
- 69,630.00
- 67,320.00
- 88,880.00
- 88,880.00
- 93,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 128,630.00
- 114,950.00
- 129,110.00
- 71,500.00
- 88,000.00
- 93,900.00
- 111,320.00
- 125,840.00
- 141,570.00
- 50,820.00
- 58,080.00
- 47,190.00
- 50,820.00
- 72,770.00
- 51,370.00
- 52,800.00
- 72,770.00
- 22,990.00
- 62,340.00
- 138,070.00
- 121,490.00
- 154,760.00
- 138,070.00
- 143,990.00
- 60,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 128,150.00
- 128,150.00
- 16,500.00

- 133,100.00
- 605,000.00
- 160,930.00
- 242,000.00
- 3,025,000.00
- 122,820.00
- 280,720.00
- 309,760.00
- 183,920.00
- 313,500.00
- 159,500.00
- 159,500.00

- 52,190.00
- 230,220.00
- 165,830.00
- 205,700.00
- 229,270.00
- 109,340.00
- 64,970.00
- 67,100.00

- 1,870,000.00
- 2,252,250.00
- 2,475,000.00
- 212,030.00
- 147,130.00
- 38,500.00
- 17,910.00
- 27,670.00
- 40,700.00
- 61,820.00
- 117,150.00
- 176,830.00
- 700,000.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.183 9,950.00
M.183 4,525.00
- 10,550.00
M.184 4,950.00
M.185 26,625.00
- 51,325.00
M.064 9,650.00
- 9,150.00
M.170 62,700.00
- 68,750.00
- 165,000.00
- 69,650.00

16,410,050.00
- 6,802,975.00
- 4,642,450.00
- 6,362,500.00
- 5,327,925.00
- 6,155,475.00
- 678,625.00
- 8,320,175.00
- 6,933,500.00
- 4,486,375.00
- 9,664,950.00
- 8,482,175.00
- 9,019,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 9,473,150.00
- 83,772,750.00
- 100,526,200.00
- 13,508,050.00
- 15,406,925.00
- 13,507,775.00
- 14,193,250.00
- 1,225,150.00
- 1,225,100.00
- 1,140,625.00
- 849,975.00
- 644,350.00
- 5,812,750.00
- 4,207,725.00
- 993,925.00
- 311,225.00
- 251,800.00
- 155,600.00
- 1,050,475.00
- 1,050,475.00
- 1,158,450.00
- 572,600.00
- 466,575.00
- 371,800.00
- 180,150.00
- 510,100.00
- 350,150.00
- 309,500.00
- 184,750.00
- 337,125.00
- 24,450.00
- 20,400.00
- 17,950.00
- 252,950.00
- 184,850.00
- 87,500.00
- 605,150.00
- 605,150.00
- 87,500.00
- 925,400.00
- 419,500.00
- 404,425.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 309,500.00
- 210,050.00
- 350,150.00
- 350,150.00
- 309,500.00
- 186,925.00
- 448,025.00
- 432,050.00
- 73,800.00
- 73,800.00
- 55,400.00
- 2,800.00
- 4,650.00
- 4,650.00
- 4,650.00
- 6,600.00
- 6,600.00
- 5,250.00
- 8,300.00
- 18,425.00
- 54,300.00
- 29,425.00
- 15,325.00
- 716,200.00
- 175,450.00
- 55,400.00
- 46,125.00
- 183,025.00
- 46,125.00
- 7,325.00
- 8,300.00
- 46,125.00
- 46,125.00
- 36,975.00
- 93,450.00
- 197,300.00
- 110,775.00
- 27,700.00
- 29,525.00
- 42,450.00
- 49,900.00
- 51,750.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 68,325.00
- 46,125.00
- 153,750.00
- 59,900.00
- 77,450.00
- 36,850.00
- 44,400.00
- 69,175.00
- 183,025.00
- 53,575.00
- 105,300.00
- 119,950.00
- 3,950.00
- 6,150.00
- 9,675.00
- 14,950.00
- 16,250.00
- 23,300.00
- 22,100.00
- 29,150.00
- 31,600.00
- 31,200.00
- 46,125.00
- 74,900.00
- 101,900.00
- 87,725.00
- 363,850.00
- 406,300.00
- 498,525.00
- 179,100.00
- 20,650.00
- 16,900.00
- 24,625.00
- 23,075.00
- 35,275.00
- 40,200.00
- 60,050.00
- 169,450.00
- 186,750.00
- 221,625.00
- 272,875.00
- 363,650.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 471,325.00
- 4,750.00
- 26,225.00
- 7,925.00
- 19,525.00
- 13,550.00
- 5,875.00
- 7,325.00
- 10,500.00
- 36,850.00
- 13,425.00
- 33,925.00
- 4,150.00
- 7,075.00
- 1,237,175.00
- 73,800.00
- 36,850.00
- 73,800.00
- 240,000.00
- 10,500.00
- 46,125.00
- 2,700.00
- 3,675.00
- 2,200.00
- 9,450.00
- 13,175.00
- 11,000.00
- 5,500.00
- 73,800.00
- 1,472,175.00
- 10,625.00
- 9,275.00
- 46,125.00
- 1,950.00
- 4,650.00
- 36,975.00
- 23,225.00
- 23,225.00
- 29,450.00
- 36,975.00
- 16,650.00
- 92,375.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 92,375.00
- 6,600.00
- 132,950.00
- 110,775.00
- 128,700.00
- 173,250.00
- 425.00
- 207,900.00
- 36,600.00
- 58,575.00
- 129,200.00
- 129,200.00
- 5,575.00
- 14,825.00
- 1,125.00
- 39,950.00
- 46,600.00
- 203,325.00
- 333,150.00
- 173,050.00
- 224,800.00
- 313,625.00
- 149,100.00
- 159,725.00
- 179,225.00
- 375,350.00
- 4,650.00
- 83,100.00
- 1,213,375.00
- 664,825.00
- 1,766,600.00
- 33,300.00
- 433,500.00
- 64,650.00
- 46,600.00
- 46,600.00
- 39,950.00
- 8,350.00
- 69,250.00
- 166,175.00
- 304,900.00
- 10,200.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 2,800.00
- 12,025.00
- 11,100.00
- 22,200.00
- 57,900.00
- 199,650.00
- 110,775.00
- 129,275.00
- 583,700.00
- 757,925.00
- 1,524,500.00
- 1,698,725.00
- 1,916,500.00
- 3,750.00
- 18,425.00
- 27,700.00
- 6,525.00
- 8,350.00
- 5,725.00
- 22,200.00
- 73,800.00
- 12,025.00
- 406,300.00
- 27,700.00
- 166,175.00
- 5,575.00
- 11,100.00
- 12,925.00
- 3,750.00
- 1,300.00
- 1,750.00
- 1,925.00
- 5,125.00
- 6,600.00
- 3,750.00
- 5,575.00
- 11,150.00
- 1,300.00
- 3,750.00
- 166,225.00
- 70,225.00
- 46,175.00
- 950.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 27,700.00
- 1,200,425.00
- 36,950.00
- 36,950.00
- 36,950.00
- 36,950.00
- 369,350.00
- 788,200.00
- 609,450.00
- 14,250.00
- 23,225.00
- 9,225.00
- 27,700.00
- 46,175.00
- 83,100.00
- 5,575.00
- 8,550.00
- 46,175.00
- 256,225.00

WALIKOTA PONTIANAK

SUTARMIDJI
LAMPIRAN 2 : KEPUTUSAN WALIKOTA PONTIANAK
NOMOR : ………………… TAHUN 2010
TANGGAL : ……………-…………2010

TENTANG
DAFTAR HARGA SATUAN TANAMAN HIAS
DI KOTA PONTIANAK TAHUN 2010
Periode : Januari 2010

NO JENIS BAHAN PERTAMANAN UKURAN


TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5

I. RUMPUT (LAWN)
1 Rumput gajah ( Axonopus sp )
a. Tandur 100 Titik/M2 M2
b. Lempeng, jarak lempeng + 2 cm 25 x 25 cm M2
2 Rumput golf (Tifton grass) Tandur 100 Titik/M2 M2
3 Rumput manila (Zoysia matrela),jrk lempeng 2 cm 25 x 25 cm M2
4 Rumput manila (Zoysia matrela) Tandur 100 Titik/M2 M2

II PENUTUP TANAH
1 Anggrek tanah (Sphatoglotis plicata), rumpun 35 - 40 2 btg, 3 anakan Polybag
2 Bayam merah (Alteanthera ficoidea), rumpun 20 - 25 1 btg/rumpun Polybag
3 Beludru coklat (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag
4 Beludru Hijau (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag
5 Botan (Centaurea candisina) 25 - 30 1 btg Polybag
6 Cendrawasih (Phyllantus sp) 15 - 20 Tajuk 20 - 25 Polybag
7 Cocor bebek (Kalanchoe pinnata) 15 - 20 1 btg Polybag
8 Crossandra 20 - 40 Tajuk 20 - 25 Polybag
9 Dinding ari (Hemigraphis colorata) 7 - 10 3 s/d 4 btg/rpn Polybag
10 Dracaena Tricolor 30 Polybag
11 Gandarusa 15 3 s/d 4 btg/rpn Polybag
12 Jengger ayam air mancur daun besar 15 - 20 dia. 1 btg Polybag
13 Jengger ayam air mancur daun kecil 15 - 20 dia. 1 btg Polybag
14 Jengger ayam a.m. protol besar 20 - 25 dia. Btg 1 cm Polybag
15 Jengger ayam a.m. protol kecil 20 - 25 dia. Btg 1 cm Polybag
16 Kembang coklat putih (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag
17 Kembang coklat merah muda (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag
18 Krokot (Althernantera amoenna) 10 5 btg/rpn Polybag
19 Lili paris bintang (Chlorophytum sp) 10 - 12 1 btg/rpn Polybag
20 Lili paris kasar (Ophiopogon jaburan) 20 - 25 5 s/d 7 btg/rpn Polybag
21 Lili paris kasar (Ophiopogon jaburan) 25-35 5 s/d 7 btg/rpn Polybag
22 Lili paris kucai (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag
21 Lili paris umbi (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag
22 Lili paris brazil (Chlorophytum sp) 15 - 20 3 s/d 5 btg/rpn Polybag
24 Mirten perak (Malphigia sp) 20 - 25 3 s/d 5 btg/rpn Polybag
25 Mirten rebah (Malphigia sp) 10 - 15 Tajuk 10 - 15 Polybag
26 Mirten tegak (Malphigia sp) 30 - 35 3 btg/rpn Polybag
27 Nanas kerang (Rhoeo discolor) 3-5 1 btg Polybag
28 Nanas merah (Ananas sp) 15-20 Tajuk 20 - 25 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
28 Nanas merah (Ananas sp) 30-40 Tajuk 20 - 25 Polybag
29 Seruni rambat (Wedelia trilobata) 10 3 s/d 5 btg/rpn Polybag
30 Sutra bombai banci (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag
31 Sutra bombai ungu (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag
32 Tagetes (Tagetes erecta) 20 - 25 Tajuk 15 - 20 Polybag
33 Nanas kerang (Rhoeo discolor) 20 1 btg Polybag
34 Katis kodok hijau (Sansiviera sp) isi 10 10 10 btg/pot Polybag
35 Katis kodok kuning (Sansiviera sp) isi 10 10 10 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
36 Pedang-pedangan strip kuning (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag
37 Pedang-pedangan strip hijau (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag
38 Pandan Kuning Africa 30 Polybag
39 Pangkas kuning kecil (Duranta repens) 10 3 s/d 5 btg/rpn Polybag
40 Pangkas kuning sedang (Duranta repens) 15 3 s/d 5 btg/rpn Polybag
41 Lantana Warna-Warni 15 3 s/d 5 btg/rpn Polybag
42 Taiwan Beauty bunga ungu (Cuphea sp) 25 Tajuk 15 Polybag
44 Taiwan Beauty bunga ungu (Cuphea sp) 16 Tajuk 15 Polybag
45 Cover Crop (Kacang-kacangan) 7-10 10 btg / rpn Polybag

III PERDU
1 Agave putih (Agave sp) 40 dia. Tajuk 30 Polybag
2 Agave biasa (Agave sp) 50 dia. Tajuk 40 Polybag
3 Aglonema (Aglaonema sp) 40 3 btg Polybag
4 Bilawan (Plumbago aphylia) 10 - 15 3 btg Polybag
5 Bougenvil berbunga bentukan penuh 60 dia.Tajuk 60 Polybag
6 Bougenvil hawai (Bougainvillea sp) 60 dia.Tajuk 60 Polybag
7 Bougenvil Biasa 60 dia.Tajuk 60 Polybag
8 Dendron biasa (Phillodendron sp) 15 - 20 1 btg Polybag
9 Dendrose lokal Jkt Merah 20 - 40 dia.Tajuk 10-15 Polybag
10 Balanceng india (Dieffenbachia sp) 30 3 daun/btg Polybag
11 Dracena tricolor (Dracena sp) 30 dia. Tajuk 30 Polybag
12 Kacapiring (Gardenia sp) 50 dia. Tajuk 30 Polybag
13 Pisang-pisangan (Heliconia sp) bunga
kuning / merah 50 2 s/d 3 btg/rpn Polybag
14 Spatiphylum lokal (Spatiphylum sp) 15 - 20 3 bth/pot Polybag
15 Spatiphylum luar (Spatiphylum sp) 15 - 20 3 btg Polybag
16 Beringin putih kecil (Ficus hybrida) ex Jkt 30 diaTajuk 15 -20 Polybag
17 Kamboja jepang (Adenium cutanium) bercabang 30 dia.Tajuk 15-20 Polybag
18 Kamboja putih 100 dia. Btg 3 Polybag
19 Kamboja rantai 100 dia. Btg 3 Polybag
20 Kana (Canna hibrida) 40 2 s/d 3 btg/rpn Polybag
21 Kastuba (Euphorbia pulcherima) 25 - 30 dia. Tajuk 30 Polybag
22 Kembang sepatu putih (Hibiscus mutabilis) 30 1 btg/pot Polybag
23 Lusiana 50 - 75 dia. Btg 1,5 Polybag
24 Mawar putih (Rosa Hybrida) 25 dia.Tajuk15 -20 Polybag
25 Mawar merah (Rosa Hybrida) 30 dia.Tajuk 15-20 Polybag
26 Melati costa (Jasminum sp) 50 2 anakan/rpn Polybag
27 Melati Gambir (Jasminum sp) 50 2 anakan/rpn Polybag
28 Melati Malaysia Polybag
29 Oleander (Nerium indicum) 30 1 rpn Polybag
30 Pepayungan (Cyperus altemifolius) 60 5 anakan/pot Polybag
31 Pandan hijau jepang (Pandanus sp) 50 1 rpn Polybag
32 Pandan kuning afrika 50 1 rpn Polybag
33 Pangkas Hijau 10 3 s/d 5 btg/rpn Polybag
33 Pangkas Hijau 20-40 3 s/d 5 btg/rpn Polybag
34 Variegata Polybag
34 Sambang darah 50 dia. Tajuk 30 Polybag
35 Siklok Polybag
36 Wali songo daun kecil (Scheffera sp) 50 1 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
37 Soka bangkok (Ixora sp) 20 1 btg/pot Polybag
38 Soka jepang bunga orange (Ixora sp) 20 1 btg/pot Polybag
39 Soka philipina (Ixora sp) 20 1 btg/pot Polybag
40 Soka siantan (Ixora tricia) 20 1 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
41 Soka singapura (Ixora cocineae) bunga
putih, pink 30 1 btg/pot Polybag
42 Soka jawa/hawai (Ixora sp) 30 1 btg/pot Polybag
43 Terang bulan daun putih/kuning (Thitonia sp) 20 3 s/d 5 btg/rpn Polybag
44 Tombak raja (Yucca gloriosa) 40 3 s/d 5 btg/rpn Polybag
45 Tapak dara 10 - 15 3 s/d 5 btg/rpn Polybag
46 Pangkas Hijau 3-5 3 s/d 5 btg/rpn Polybag
47 Pangkas Hijau 20 4 s/d 7 btg/rpn Polybag
48 Bayam Merah 10 - 15 3 s/d 5 btg/rpn Polybag
49 Soka Merah 20 1 btg/pot Polybag
50 Bawang-bawangan 15-20 f5 s/d 7 btg/rpn Polybag
51 Bawang-bawangan 20-25 f5 s/d 7 btg/rpn Polybag
52 Veberia Polybag
53 Vinolia 20-30 5 s/d 10btg/rpn Polybag
54 Vinolia 10-15 2 s/d 4 btg/rpn Polybag
55 Vinolia 35-40 12sd 20 btg/rpn Polybag
56 Variegata Polybag
57 Aires Polybag
58 Ketela Merah 10 1sd 2 btg/rpn Polybag
59 Kana Presiden 15 - 20 1sd 2 btg/rpn Polybag

IV TANAMAN PAGAR
1 Kedondong laut (Nothopanax sp) 30-65 3 s/d 4 btg/rpn Polybag
2 Kedondong laut (Nothopanax sp) 60 - 75 3 s/d 4 btg/rpn Polybag
3 Kemuning (Murraya paniculata) 75 1 btg/rpn Polybag
4 Lantana pagar (Lantana camara) 30 1rpn Polybag
5 Mangkokan (Nothopanax sp) 50 3 s/d 4 btg/rpn Polybag
6 Mirten pagar (Malphigia sp) 50 3 s/d 4 btg/rpn Polybag
7 The-tehan tinggi (Durantha repens) 30 3 s/d 4 btg/rpn Polybag
8 The-tehan tinggi (Durantha repens) 50 3 s/d 4 btg/rpn Polybag
9 The-tehan tinggi (Durantha repens) 70 3 s/d 4 btg/rpn Polybag
10 Krokot 15 Polybag

V TANAMAN MERAMBAT
1 Air mata pengantin ( Antigonon leptapus) 30 dia. Tajuk 430 Polybag
2 Air mata pengantin ( Antigonon leptapus) 50 dia. Tajuk 40 Polybag
2 Alamanda (Alamanda cathartica) 30 dia. Tajuk 20 Polybag
3 Alamanda (Alamanda cathartica) 50 dia. Tajuk 40 Polybag
4 Arabidea (Arabidea sp) 40 dia. Tajuk 30 Polybag
5 Flame of irian (Orange) 40 dia. Tajuk 30 Polybag
6 Kembang kelinci (Ipomea sp) 40 dia. Tajuk 30 Polybag
7 Kembang sungsang (Gloriosa superba) 30 dia. Tajuk 20 Polybag
8 Lantana rambut ungu (Lantana sp) 20 3 s/d 4 btg/rpn Polybag
9 Pasiflora 60 dia. Tajuk 40 Polybag
10 Sirih Gading daun strip kuning (Scindapsus sp) 30 3 s/d 4 btg/rpn Polybag
11 Sthephanot bunga putih
(Sthepanothis floribunda) 30 dia. Tajuk 40 Polybag
12 Nona Makan Sirih 30 Polybag
13 Ubi rambat Kuning 30 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
VI TANAMAN HIAS
1 Anjuang hijau (Dracaena sp) 60 dia. Tajuk 40 Polybag
2 Anjuang kribo (Dracaerna sp) 60 dia. Tajuk 40 Polybag
3 Anjuang kuning (Dracaerna sp) 60 dia. Tajuk 40 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
4 Anjuang merah (Cordelyne terminalis) 40 dia. Tajuk 20 Polybag
5 Anjuang merah (Cordelyne terminalis) 60 dia. Tajuk 40 Polybag
6 Anjuang merah (Cordelyne terminalis) 80 dia. Tajuk 50 Polybag
7 Anjuang suji (Dracaena sp) 60 dia. Tajuk 40 Polybag
8 Azalea (Azalea sp) 50 dia. Tajuk 40 Polybag
9 Bakung kecil (Hymenochalys sp) 20 dia. Tajuk 40 Polybag
10 Beringin bonsai (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag
11 Beringin bonsai bentukan (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag
12 Beringin bonsai putih (Ficus benjamina) 250 dia. Tajuk 100 Polybag
13 Bonsai serut 151 - 200 dia. Tajuk 100 Polybag
14 Nusa indah merah/putih (Nussaenda sp) 50 dia. Tajuk 40 Polybag
15 Rambusa 50 Polybag
16 Pakis kelabang kuning (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag
17 Pakis krol (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag
18 Pakis monyet (Alsophila glauca) 150 - 200 dia. Tajuk 40 Polybag
19 Pisang kipas (Ravanela madagaskariensis) 200 - 250 dia. Btg 10 Polybag
20 Puring bor (Codiaeum sp) 75 dia. Tajuk 30 Polybag
21 Puring buntut (Codiaeum sp) 75 dia. Tajuk 30 Polybag
22 Puring gelatik (Codiaeum sp) 75 dia. Tajuk 30 Polybag
23 Puring jet (Codiaeum sp) 40 dia. Tajuk 20 Polybag
24 Puring jet (Codiaeum sp) 75 dia. Tajuk 30 Polybag
25 Puring ketapang (Codiaeum sp) 50 dia. Tajuk 30 Polybag
26 Puring nuri (Codiaeum sp) 60 dia. Tajuk 30 Polybag
27 Puring Kuning 20 dia. Tajuk 30 Polybag
28 Siklok dia. Btg 5 Polybag
29 Sikas/Pakis haji halus (Cycas revoluta) 80 dia. Btg 7,5 Polybag
30 Sikas diameter tajuk daun (Cycas sp) 100 dia. Btg 10 Polybag
31 Sikas medan (Cycas sp) 100 dia. Btg 10 Polybag
32 Sikas/pakis haji kasar (Cycas rumpi) 50 - 100 dia. Btg 7,5 Polybag
33 Kamboja kuning (Bali) tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag
34 Kamboja orange tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag
35 Lidah Buaya Besar 10-25 2-3 btg/pot Polybag
36 Lidah Buaya Kecil 50 5-7 btg/pot Polybag

VII PALEM
1 Kelapa gading (Cocos capitata) 200 - 250 dia. Btg 20 Phn
2 Kelapa sawit (Elais guineensis) 200 - 250 dia. Btg 40 Phn
3 Kelapa sayur (Cocos nucifera) 200 - 250 dia. btg 30 Phn
4 Kurma (Phoenix daetilifera) 100 dia. btg 30 Phn
5 Kurma (Phoenix daetilifera) >200 dia. Btg 40 Phn
6 Lontar (Borassus flabefiter) 300 dia. Btg 25 Phn
7 Palm anggur (Lalania loglgessu) 100 dia. Btg 15 Phn
8 Palm alexander 150 dia. Btg 10 Phn
9 Palm botol 150 - 200 dia. btg 30 Phn
10 Palm camedoria 100 3 s/d 5 btg/rpn Phn
11 Palm camedoria 200 3 s/d 5 btg/rpn Phn
12 Palm ekor tupai 50-75 Phn
13 Palm ekor tupai 200 dia. Btg 15 Phn
14 Palm jepang (Ptychosperma macarthurii) 100 - 150 5 s/d 7 btg/rpn Rmp
15 Palm jepang (Ptychosperma macarthurii) 150 - 250 5 s/d 7 btg/rpn Rmp
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
16 Palm kol (Licuala grandis) 100 dia. Btg 10 Phn
18 Palm kuning (Chrysalidocarpus lutescens) 50 - 100 3 s/d 5 btg/rpn Phn
19 Palm kuning (Chrysalidocarpus lutescens) 100 - 150 5 s/d 7 btg/rpn Rmp
20 Palm korembusa 50 dia. Btg 5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
21 Palm korembusa 100 dia. Btg 7 Phn
22 Palm korembusa >200 dia. Btg 10 Phn
23 Palm merah (Cyrtotachis lakka) 150 - 200 3 s/d 5 btg/rpn Phn
24 Palm merah (Cyrtotachis lakka) 300 - 350 5 s/d 7 btg/rpn Rmp
25 Palm phoeniks (Phoenix sp) 75 - 100 dia. Btg 8 Phn
26 Palm phoeniks (Phoenix sp) 150 - 200 dia. Btg 10 Phn
26 Palm putri 50 Phn
27 Palm putri 100-150 dia. Btg 10 Phn
28 Palm putri 150 - 200 dia. Btg 10 Phn
29 Palm pigni (Phoenix canariensis) 100 - 150 dia. Btg 10 Phn
30 Palm raja (Oredoxa regia) 100 - 200 dia. Btg 20 Phn
31 Palm raja (Super oredoxa regia) 200 - 300 dia. Btg 25 Phn
32 Palm ratu 100 - 150 dia. Btg 10 Phn
33 Palm sadeng (Livistonia rotundifolta) 50 dia. Btg 5 Phn
34 Palm saderi (Caroutamiti) 150 dia. Btg 8 Phn
35 Palm seledri tunggal tinggi 150 dia. Btg 8 Phn
36 Palm seledri tunggal putih 200 dia. Btg 8 Phn
37 Palm udang 50 3 s/d 5 btg/rpn Phn
38 Palm waregu (Rhapis excelsa) 150 5 s/d 7 btg/rpn Rmp
39 Pinang sirih (Areca catechu) 200 dia. Btg 10 Phn

VIII BAMBU DAN CEMARA


1 Bambu china (Bambussa vulgaris) 50 5 s/d 7 btg/rpn Dpr
2 Bambu daging (Bambussa venticossa) 150 5 s/d 7 btg/rpn Dpr
3 Bambu jepang (Phyliastachis aurea) 200 5 s/d 7 btg/rpn Dpr
4 Bambu kuning (Bambussa vulgaris) 150 5 s/d 7 btg/rpn Dpr
5 Cemara angin (Casuarina avisatifollia) 200 dia. Btg 4 Phn
6 Cemara gembel (Cupressus papuana) 150 dia. Btg 4 Phn
7 Cemara halus (Araucaria cuninghamii) 150 dia. Btg 4 Phn
8 Cemara kipas 100 - 150 dia. Btg 4 Phn
9 Cemara kuning daun emas (Cupressus sp) 150 dia. Btg 4 Phn
10 Cemara lilin 100 dia. Btg 3 Phn
11 Cemara laut (Casuarina aquasetifolia) 150 dia. Btg 4 Phn
12 Cemara natal (Cupressus sp) 75 dia.tajuk 50 Phn
13 Cemara norfolk (Araucaria sp) 75 dia.tajuk 50 Phn
14 Cemara norfolk (Araucaria sp) 100 - 150 dia.tajuk 60 Phn
15 Cemara norfolk (Araucaria sp) 400 - 500 dia.tajuk 200 Phn
16 Cemara pipa mas (Compressus sp) 75 dia.tajuk 40 Phn
17 Cemara tiang 100 - 140 dia. Btg 3 Phn
18 Pinus (Pinus merkusii) 200 dia. Btg 4 Phn
19 Pinus (Pinus merkusii) 300 dia. Btg 5 Phn

IX TANAMAN PEMIKAT BURUNG


1 Aren (Arenga catecu) 100 dia. Btg 3 Phn
2 Belimbing (Averhoa carambola) 75 dia. Btg 3 Phn
3 Bintaro 50 dia. Btg 3 Phn
4 Bintaro 100 dia. Btg 3 Phn
5 Bintaro 150 dia. Btg 4 Phn
6 Buni (Atidesmabunius) 200 - 300 dia. Btg 5 Phn
7 Buni (Atidesmabunius) 400 - 500 dia. Btg 10 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
8 Cermai 50-100 dia. Btg 5 Phn
9 Duku condet (Lansium domisticum) 100 dia. Btg 3 Phn
10 Durian (Durio zibenthinus) 150 dia. Btg 4 Phn
11 Gatet 200 - 300 dia. Btg 5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
12 Gowok (Eugenia polychephalum) 100 dia. Btg 3 Phn
13 Jambu air (Eugenia aquea) 100-150 dia. Btg 5 Phn
14 Jambu air (Eugenia aquea) 200-300 dia. Btg 10 Phn
15 Jambu bol (Eugenia malaccensis) 100 dia. Btg 3 Phn
16 Jambu mawar (Eugenia jambos) 100 dia. Btg 3 Phn
17 Kaliandra (Caliandra callothyrsus) 100 dia. Btg 3 Phn
18 Kantil (Michelia champaca) 100 dia. Btg 3 Phn
19 Kapilayu 100 dia. Btg 3 Phn
20 Kawista 200 - 300 dia. Btg 5 Phn
21 Kecapi (Sandoricum koetjape) 150 dia. Btg 4 Phn
22 Kecubung 100 dia. Btg 3 Phn
23 Kedondong (Spondias pinnata) 150 - 200 dia. Btg 4 Phn
24 Kemang (Baccaurea dulcis) 100 - 150 dia. Btg 3 Phn
25 Kenanga (Cananga odorata) 50 dia. Btg 3 Phn
26 Kepel (Stelechocarpus burahol) 100 dia. Btg 3 Phn
27 Kersen/serry 150 dia. Btg 4 Phn
28 Kesah 150 dia. Btg 4 Phn
29 Ketapang (Terminalia cattapa) 150 dia. Btg 4 Phn
30 Kelengkeng 100 dia. Btg 3 Phn
31 Kluwih 150 - 200 dia. Btg 4 Phn
32 Kosambi 100 dia. Btg 3 Phn
33 Lobi-lobi (Flacourtia inermis) 150 dia. Btg 4 Phn
34 Melinjo (Gnetum gnemon) 200 dia. Btg 4 Phn
35 Menteng (Baccaurea dulcis) 200 dia. Btg 4 Phn
36 Mindi 100 dia. Btg 3 Phn
37 Nam-nam 200 dia. Btg 5 Phn
38 Nangka (Artocarpus heterophyllus) 100 dia. Btg 3 Phn
39 Pala 200 - 300 dia. Btg 5 Phn
40 Petai 200 - 300 dia. Btg 5 Phn
41 Rambutan 50 dia. Btg 3 Phn
42 Rukem 100 dia. Btg 3 Phn
43 Sirsak 50-100 dia. Btg 5 Phn
44 Sawo kecik (Manilkara kauki) 100 dia. Btg 4 Phn
45 Sawo kecik (Manilkara kauki) 200 dia. Btg 4 Phn
46 Serikaya 50 dia. Btg 3 Phn
47 Yangliu 150 - 200 dia. Btg 4 Phn
48 Maja 200 dia. Btg 5 Phn

X BUNGA POTONG
1 Amarilis (Amarylidaceae) 1 Tangkai
2 Anggrek macan (Arrachnis sp) 1 Tangkai
3 Anyelir 1 Tangkai
4 Apple blossom 1 Tangkai
5 Aster (Asteraceae sp) 1 Tangkai
6 Anggrek Dendrobium 1 Tangkai
7 Gladiol 1 Tangkai
8 Golden shower 1 Tangkai
9 Krisan (Chrysanthemum llini) 1 Tangkai
10 Mawar 1 Tangkai
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
XI TANAMAN TEDUH (INDOOR PLANT)
1 Anggrek bulan 40 -50 3 s/d 5 btg/rpn Polybag
2 Anggrek cathalea 40 -50 3 s/d 5 btg/rpn Polybag
3 Anggrek douglas kecil 40 -50 3 s/d 5 btg/rpn Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
4 Apple blossom 30 - 40 Polybag
5 Asparagus 30 - 40 dia. Tajuk 20 Polybag
6 Begonia daun besar 40 -50 dia. Tajuk 20 Polybag
7 Begonia daun Kecil 40 -50 dia. Tajuk 20 Polybag
8 Begonia Hijau 40-50 dia. Tajuk 20 Polybag
9 Begonia perak 40 -50 dia. Tajuk 20 Polybag
10 Belanceng bintik 40 -50 4 s/d 5 dn/pot Polybag
11 Belanceng putih 40 -50 4 s/d 5 dn/pot Polybag
12 Golden shower 50 dia. Tajuk 20 Polybag
13 Gandasari 30 - 40 dia. Tajuk 15 Polybag
14 Hortensia 30 - 40 dia. Tajuk 30 Polybag
15 Kembang kancing 30 - 40 dia. Tajuk 20 Polybag
16 Kencuran 30 - 40 dia. Tajuk 20 Polybag
17 Krisdoren 30 - 40 dia. Tajuk 15 Polybag
18 Kuping gajah 30 - 40 4 s/d 5 dn/pot Polybag
19 Kuping keledai 30 - 40 4 s/d 5 dn/pot Polybag
20 Maranta macan 30 - 40 dia. Tajuk 25 Polybag
21 Maranta batik 30 - 40 dia. Tajuk 25 Polybag
22 Maranta buntut ayam 30 - 40 dia. Tajuk 25 Polybag
23 Maranta keris 30 - 40 dia. Tajuk 25 Polybag
24 Maranta sepat 30 - 40 dia. Tajuk 25 Polybag
25 Meranti bintik 40 -50 dia. Tajuk 20 Polybag
26 Meranti kol 40 -50 dia. Tajuk 20 Polybag
27 Meranti mas koki 40 -50 dia. Tajuk 20 Polybag
28 Meranti pisang 40 -50 dia. Tajuk 20 Polybag
29 Monstera 50 - 75 4 s/d 5 dn/pot Polybag
30 Mutiara 40 -50 dia. Tajuk 20 Polybag
31 Pacing 40 -50 dia. Tajuk 20 Polybag
32 Dona Carmen 40-50 Polybag
33 Sisik Naga 30-40 Polybag
34 Palesota 20-30 Polybag
35 Diefenbachia 30-40 Polybag
36 Chiangmai 20-30 Polybag
37 Chiangmai balon 20-30 Polybag
38 Pilodendron dia. Tajuk 15 Polybag
39 Sabrina ungu 20 - 30 dia. Tajuk 15 Polybag
40 Bambu China 20-30 dia. Tajuk 20 Polybag
41 Sirih Gading 40 -50 dia. Tajuk 20 Polybag
42 Sri rejeki 30 - 40 4 s/d 5 dn/pot Polybag
43 Supelir foster kasar 30 - 40 dia. Tajuk 15 Polybag
44 Supelir halus 30 - 40 dia. Tajuk 15 Polybag
45 Tanduk rusa 40 -50 dia. Tajuk 20 Polybag
46 Walisongo biasa 50 - 100 dia. Btg 2 Polybag
47 Walisongo kuning 100 - 150 dia. Btg 3 Polybag
XII POHON PENEDUH
1 Angsana (Pterocarpus indicus) 100 - 200 dia. Btg 3 Phn
2 Asem Keranji (Pithecelluobium dulce) 150 - 200 dia.Btg 2,5s/d 4 Phn
3 Asem (Tamarindus indica) 150 - 200 dia.Btg 2,5s/d 4 Phn
4 Biola cantik 10 - 25 Phn
5 Bumi 10 - 25 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
6 Batavia 100 dia. Btg 5 Phn
7 Beringin (Ficus benjamina) 150 - 200 dia.Btg 2,5s/d 4 Phn
8 Beringin (Ficus benjamina) 200 - 300 dia. Btg 4 s/d 5 Phn
9 Beringin putih 200 dia. Btg 3,5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
10 Biola cantik (Ficus pandurata) 150 - 250 dia.Btg 2,5s/d 4 Phn
11 Bisbul (Diospyros discolor) 100 - 200 dia. Btg 3 Phn
12 Bunga kupu-kupu (Bauhunia purpurea) 400 - 500 dia.Btg 8s/d 10 Phn
13 Bunga saputangan(Amherstia nobilis) 0,50-100 dia. Btg 2 Phn
14 Bunga saputangan(Amherstia nobilis) 250-300 dia. Btg 3,5 Phn
16 Bungur (Lagerstromea loudonii) 50-100 Phn
17 Bungur (Lagerstromea loudonii) 100-150 dia. Btg 3,5 Phn
18 Bungur (Lagerstromea loudonii) 150 - 250 dia. Btg 3,5 Phn
19 Cassia golden 50-100 dia. Btg 3 Phn
20 Cassia golden 150-175 dia. Btg 3 Phn
21 Cassia golden 150-200 dia. Btg 3 Phn
22 Cassia sp 200 - 300 dia. Btg 4 s/d 5 Phn
23 Cempaka kuning (Michelia champaca) 300 - 400 dia. Btg 5 s/d 8 Phn
24 Ceremai 400 - 500 dia.Btg 8 s.d 10 Phn
25 Dadap hutan (Erythrina sp) 300 - 400 dia. Btg 5 s/d 8 Phn
26 Dadap kuning (Erythrina veriegata sp) 300 - 400 dia. Btg 5 s/d 8 Phn
27 Dadap kuning (Erythrina veriegata sp) 100 - 200 dia. Btg 5 s/d 8 Phn
28 Dadap merah (Erythrina christagali 150 - 200 dia. Btg 3,5 Phn
29 Dadap merah (Erythrina christagali 300 - 400 dia. Btg 5 s/d 8 Phn
30 Sungkai 50 - 100 Phn
31 Sungkai 150 Phn
31 Damar (Agathis alba) 500 - 700 dia. Btg > 10 Phn
32 Flamboyan (Delonix regia) 150 dia. Btg 2,5 Phn
33 Gemelina 300 dia. Btg 5 Phn
34 Glauka 100 - 150 dia. Btg 3 Phn
33 Glodogan 10 - 25 Phn
34 Glodogan (Polyalthea longifolia) 100-150 dia. Btg 3,5 Phn
35 Glodogan (Polyalthea longifolia) 150 - 200 dia. Btg 3,5 Phn
36 Glodogan (Polyalthea longifolia) 200 - 300 dia. Btg 4 s/d 5 Phn
37 Glodogan tiang (Sarracca sp) 50 Phn
38 Glodogan tiang (Sarracca sp) 150 - 300 dia. Btg 4 Phn
39 Glodogan tiang (Sarracca sp) 400 - 500 dia.Btg 8 s.d 10 Phn
40 Jatimas 200 - 300 dia. Btg 4 s/d 5 Phn
41 Jakaranda (Jacaranda acutifolia) 150 - 200 dia. Btg 3,5 Phn
42 Johar (Cassia siamea) 150 dia. Btg 3 Phn
43 Kamboja putih ( Plumeria rubra) 200 - 300 dia. Btg 4 s/d 5 Phn
44 Kamboja rantai 300 - 400 dia. Btg 5 s/d 8 Phn
45 Karet kebo (Ficus elastica) 100 dia. Btg 3 Phn
46 Kasia bunga kuning (Cassia multijuga) 150 - 200 dia. Btg 3,5 Phn
47 Kastuba (Euphorbia pulcherrima) 200 - 300 dia. Btg 4 s/d 5 Phn
48 Kayu manis (Cinnamon bumanni) 200 dia. Btg 3,5 Phn
49 Kayu manis (Cinnamon bumanni) 400 - 600 dia. Btg 8s.d10 Phn
50 Kayu putih (Maleucaa leucadendron) 200 - 300 dia. Btg 4 s/d 5 Phn
51 Kembang kupu-kupu (Bauhinia pupurea) 100-150 dia. Btg 3,5 Phn
52 Kembang kupu-kupu (Bauhinia pupurea) 150 - 200 dia. Btg 3,5 Phn
53 Kembang merak (Caesalpina pulcherrima) 100-150 dia. Btg 3 Phn
54 Kembang merak (Caesalpina pulcherrima) 200 dia. Btg 3 Phn
55 Kembang sepatu kuning (Hibiscus hybridus) 100 - 200 dia. Btg 3,5 Phn
56 Kenari (Canarium commune) 100 - 150 dia. Btg 3 Phn
57 Kenari (Canarium commune) 300 - 400 dia. Btg 5 s/d 8 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
58 Ketapang (Terminalia catappa) 150 - 200 dia. Btg 3,5 Phn
59 Ketapang (Terminalia catappa) 500 - 600 dia. Btg > 10 Phn
60 Kepuh 300 - 400 dia. Btg 5 s/d 8 Phn
61 Kiara payung (Filicium decipiens) 150 - 200 dia. Btg 3,5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
62 Pucuk Merah Phn
63 Kurma 50 dia. Btg 3 Phn
64 Lampeni 150 - 200 dia. Btg 3,5 Phn
65 Mahoni (Swietania mahagoni) 20-40 dia. Btg 2 s/d 3 Phn
66 Mahoni (Swietania mahagoni) 30-50 dia. Btg 5 s/d 8 Phn
67 Mahoni (Swietania mahagoni) 50-75 dia. Btg 5 s/d 8 Phn
68 Mahoni diameter (Swietania mahagoni) 200 - 300 dia. Btg 4 s/d 5 Phn
69 Mangga (Mangifera indica) 500 - 800 dia. Btg > 10 Phn
70 Mangga Mardi Malaysia Phn
71 Sawo manila Phn
72 Jeruk Sambal calung Phn
73 Lengkeng Diamond Phn
74 Kedondong bangkok Phn
75 jambu Air bangkok Phn
76 jambu Batu Merah Phn
77 Matoa irian (Pometia pinata) 300 - 400 dia. Btg 5 s/d 8 Phn
78 Pucuk Merah 75-100 dia. Btg 5 s/d 8 Phn
79 Pule (Alsonia scholaris) 600 - 700 dia. Btg > 10 Phn
80 Salam 50 - 100 dia. Btg 3 Phn
81 Salam 10 - 25 Phn
82 Sikat botol 200 - 300 dia. Btg 4 s/d 5 Phn
83 Santorium 500 - 600 dia. Btg > 10 Phn
84 Sawo duren (Chrysophillium cainito) 150 - 200 dia. Btg 3,5 Phn
85 Sawo kecik (Chrysophillium sp) 200 dia. Btg 3,5 Phn
86 Sono keling/Sengon (Abaziafalcata) 150 - 200 dia. Btg 3,5 Phn
87 Spathodea campanulata 150 - 200 dia. Btg 3,5 Phn
88 Spathodea campanulata 500 - 600 dia. Btg > 10 Phn
89 Tabebuia 100 - 200 dia. Tajuk 50 - 70 Phn
90 Tanjung (Mimusops elengi) 10 - 25 Phn
91 Tanjung (Mimusops elengi) 60 -100 Phn
92 Tanjung (Mimusops elengi) 100-150 Phn
93 Tanjung (Mimusops elengi) 150-200 dia. Btg 3,5 Phn
94 Tanjung (Mimusops elengi) 200-250 dia. Btg 5 s/d 7 Phn
95 Tanjung (Mimusops elengi) 200 - 300 dia. Btg 4 s/d 5 Phn
96 Sirsak Madu 150 -200 dia. Btg 3,5 Phn
97 Melinjo 150 - 200 dia. Btg 3,5 Phn
98 Mahkota Dewa 150 - 200 dia. Btg 3,5 Phn
99 Trembesi (Samanea saman) 10 - 25 Phn
100 Trembesi (Samanea saman) 200 dia. Btg 3,5 Phn
101 Trembesi (Samanea saman) 400 - 500 dia. Btg 8s.d 10 Phn
102 Trembesi (Samanea saman) 600 - 700 dia. Btg > 10 Phn
103 Trenggulin (Cassia fistula) 50 - 150 dia. Btg 3 Phn
104 Walisongo (Alithurium macrolobium) 50 - 100 dia. Btg 3 Phn
104 Walisongo (Alithurium macrolobium) 200 dia. Btg 3,5 Phn
105 Walisongo (Alithurium macrolobium) 300 dia. Btg 5 Phn
106 Waru (Hibiscus tiliaceus) 500 - 600 dia. Btg > 10 Phn
107 Yangliu (Salyx babylonia) 150 - 200 dia. Btg 3,5 Phn
XIII BIJI
1 Bixa (Bixaceae sp) 1 Kg
2 Bunga kupu-kupu (Bauhunia pupurea) 1 Kg
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
3 Bungur (Largerstroemia loudonii) 1 Kg
4 Buni (Antidesma bunius) 1 Kg
5 Glodogan (Polyalthea longifolia) 1 Kg
6 Mahoni (Swietenia mahagoni) 1 Kg
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
7 Salam (Eugenia Polyanthum) 1 Kg
8 Tanjung (Mimusops elengi) 1 Kg
9 Trembesi (Samanea saman) 1 Kg

XIV TANAMAN HIAS YG MEMILIKI NILAI KHUSUS


1 Anthurium 50 Kondisi optimal Polybag
2 Belenceng yongmay 50 Kondisi optimal Polybag
3 Bonsai bentuk 75 Kondisi optimal Phn
4 Cemara dent 100 - 150 Kondisi optimal Phn
5 Cemara udang 50 - 100 Kondisi optimal Phn
6 Cemara udang 150 - 200 Kondisi optimal Phn
7 Kamboja jepang bentuk 100 - 200 Kondisi optimal Phn
8 Kapu-kapu 50 Kondisi optimal Phn
9 Krisan pot 30 - 40 Kondisi optimal Pot
10 Lotus 10 - 30 Kondisi optimal Rmp
11 Melati air 40 - 50 Kondisi optimal Rmp
12 Meranti karet 40 - 50 Kondisi optimal Rmp
13 Meranti pisang 100 Kondisi optimal Phn
14 Nolina 100 Kondisi optimal Phn
15 Pacira tinggi 150 Kondisi optimal Phn
16 Palm segitiga tinggi 150 - 200 Kondisi optimal Phn
17 Pandan bali cabang tinggi 150 - 200 Kondisi optimal Phn
18 Pandan bali tunggal tinggi 100 Kondisi optimal Phn
19 Philodendron hijau 50 Kondisi optimal Phn
20 Philodendron kuning 50 Kondisi optimal Phn
21 Philodendron merah 50 Kondisi optimal Phn
22 Puring kuning 50 Kondisi optimal Phn
23 Sikas antik tinggi 100 Kondisi optimal Phn
24 Srikit bangkok 40 - 50 Kondisi optimal Phn
25 Teratai biasa 10 - 20 Kondisi optimal Rmp
26 Tipha 50 - 100 Kondisi optimal Rmp
27 Zannia kelompok diameter 100 Kondisi optimal Phn
28 Zannia tunggal 50 Kondisi optimal Phn

WAKIL WALIKOTA PONTIANAK

TERTANDA

PARYADI, S.Hut

Untuk salinan sesuai dengan bunyi aslinya


SEKRETARIS DAERAH KOTA PONTIANAK

Ir. H. TONI HERIANTO, MT


Pembina Utama Muda
NIP. 19541129 198003 1 016
NOMOR : ………………… TAHUN 2010

TENTANG
TAR HARGA SATUAN TANAMAN HIAS
DI KOTA PONTIANAK TAHUN 2010

HARGA BAHAN

9,000
31,000
10,250
9,000
5,000

8,000
2,000
3,000
3,000
4,500
12,017
5,000
11,000
10,000
17,500
3,500
6,000
6,000
6,000
7,000
3,250
3,250
1,000
3,250
5,000
10,658
3,500
3,250
4,500
12,000
17,500
20,000
3,250
4,500
HARGA BAHAN

7,500
11,996
1,500
2,500
2,500
5,000
4,750
6,250
HARGA BAHAN

6
6,750
5,250
10,000
2,000
3,250
6,000
10,500
4,000
1,500

55,000
37,500
30,000
40,000
125,000
150,000
50,000
20,000
17,500
22,500
15,000
12,500

5,000
11,000
25,000
145,000
27,500
100,000
90,000
10,000
35,000
27,500
22,500
5,000
5,000
22,500
22,500
22,500
11,000
8,500
35,000
37,500
1,500
2,250
15,000
40,000
92,500
20,000
HARGA BAHAN

6,500
4,000
4,000
4,000
HARGA BAHAN

4,000
5,000
6,000
52,500
3,500
1,500
2,500
2,000
6,500
5,050
6,000
7,500
6,000
5,750
6,500
15,000
4,950
3,650
5,000

6,000
8,750
35,000
17,500
15,000
15,000
13,500
23,500
30,000
1,008

40,000
47,500
12,500
15,000
50,000
35,000
40,000
40,000
7,500
20,000
10,000

30,000
15,000
2,500
HARGA BAHAN

10,000
11,000
12,500
HARGA BAHAN

6
8,000
11,000
15,000
13,500
25,000
5,500
225,000
375,000
1,000,000
2,500,000
20,000
30,000
10,000
12,500
200,000
475,000
20,000
20,000
20,000
14,500
30,000
20,000
20,000
7,500
100,000
900,000
1,000,000
1,350,000
125,000
400,000
300,000
40,000
15,000

450,000
450,000
175,000
400,000
3,500,000
400,000
150,000
125,000
300,000
110,000
300,000
45,000
225,000
110,000
250,000
HARGA BAHAN

65,000
42,500
125,000
40,000
HARGA BAHAN

6
60,000
70,000
110,000
325,000
175,000
375,000
45,000
140,000
300,000
8,000,000
150,000
425,000
80,000
62,500
70,000
150,000
400,000
35,000
50,000
250,000

45,000
75,000
67,500
235,000
200,000
50,000
75,000
150,000
550,000
52,500
150,000
62,500
62,500
150,000
1,250,000
75,000
77,500
275,000
400,000

275,000
57,500
20,000
40,000
70,000
80,000
250,000
HARGA BAHAN

35,000
75,000
175,000
90,000
HARGA BAHAN

6
40,000
61,750
300,000
175,000
50,000
40,000
65,000
44,000
99,000
341,000
77,000
165,000
33,000
52,250
38,500
132,000
88,000
137,500
164,340
27,500
16,500
38,500
110,000
99,000
38,500
93,500
121,000
170,500
165,000
22,000
33,000
38,500
66,000
220,000
66,000
165,000
99,000

17,875
275,000
13,750
11,000
15,125
68,750
13,750
55,000
16,500
5,500
HARGA BAHAN

110,000
82,500
25,850
HARGA BAHAN

6
55,000
22,000
24,750
24,750
24,750
23,100
165,000
22,000
44,000
22,000
33,000
11,000
11,000
16,500
38,500
49,500
24,750
22,000
27,500
22,000
22,000
22,000
22,000
22,000
22,000
11,000
5,500
5,500
41,250
55,000
60,500
82,500
44,000
96,750
8,250
5,500
16,500
16,500
22,000
27,500
27,500
44,000
44,000
137,500

100,100
324,500
143,000
35,750
10,100
HARGA BAHAN

71,500
393,250
572,000
1,430,000
HARGA BAHAN

6
286,000
28,600
429,000
154,200
171,600
71,500
180,753
214,500
57,475
57,600
78,650
85,800
128,700
321,750
250,250
286,000
143,000
250,250
572,000
67,100
357,500
643,500
143,000
128,700
50,050
7,150
151,250
178,750
286,000
14,300
178,750
321,750
286,000
50,050
107,250
286,000
1,144,000
35,750
171,600
357,500
100,100
193,050
85,800
121,000
181,500
90,750
181,500
214,500
71,500
171,600
HARGA BAHAN

321,750
643,500
100,100
143,000
HARGA BAHAN

6
80,000
214,500
78,650
101,875
121,000
143,000
214,500
2,145,000
178,750
178,750
28,600
89,375
117,975
107,250
46,475
1,101,100
137,500
572,000
71,500
42,900
357,500
572,000
250,250
357,500
85,800
57,200
643,500
15,250
17,875
66,000
79,860
95,835
181,500
286,000
89,375
121,550
143,000
58,650
135,850
217,950
500,500
42,900
107,250
321,750
500,500
500,500
214,500

44,000
33,000
HARGA BAHAN

22,000
44,000
44,000
11,000
HARGA BAHAN

6
22,000
16,500
33,000

247,500
55,000
1,100,000
1,237,500
1,045,000
2,475,000
1,375,000
38,500
38,500
143,000
44,000
44,000
44,000
165,000
330,000
495,000
495,000
176,000
22,000
55,000
220,000
13,750
1,320,000
66,000
46,750
88,000
137,500
121,000

WAKIL WALIKOTA PONTIANAK

TERTANDA

PARYADI, S.Hut

Untuk salinan sesuai dengan bunyi aslinya


SEKRETARIS DAERAH KOTA PONTIANAK

Ir. H. TONI HERIANTO, MT


Pembina Utama Muda
NIP. 19541129 198003 1 016