URAIAN

NO PEKERJAAN VOL SAT ANALISA HARGA SATUAN (RP)


I PEKERJAAN PENDAHULUAN
1 Pembersihan lahan 160.00 M2
2 Pemasangan bowplank 38.40 M`
3 Listrik & air kerja 1.00 Ls

II PEKERJAAN TANAH
1 Galian pondasi 15.18 M3
2 Pasir urug 1.16 M3
3 Timbuanan kembali galian pondasi 5.06 M3
4 Tanah timbun dibawah lantai 6.66 M3

III PEKERJAAN STRUKTUR


1 Pondasi menerus, pas. batu kali 7.00 M3
2 Sloof, 15/20
Bekisting 23.36 M2
Pembesian
- Besi beton 4Ø 10 mm 144.19 Kg
- Besi beugel Ø 6- 150 mm 60.56 Kg
Cor beton 1.75 M3
3 Kolom praktis 15 cm x 15 cm
Bekisting 34.56 M2
- Besi beton 4Ø 10 mm 142.22 Kg
- Besi beugel Ø 6- 150 mm 51.20 Kg

Cor beton 1.29 M3


4 Ring balk 15 cm/20 cm
Bekisting 23.36 M2
Pembesian
- Besi beton 4Ø 10 mm 144.19 Kg
- Besi beugel Ø 6- 150 mm 60.56 Kg
Cor beton 1.75 M3
5 Balok tembok layar
Bekisting M2
Pembesian
- Besi beton 4Ø 10 mm 55.30 Kg
- Besi beugel Ø 6- 150 mm 23.22 Kg
Cor beton 0.67 M3
6 Meja beton
Bekisting M2
Pembesian Ø 8- 125 mm Kg
Cor beton M3
IV PEKERJAAN DINDING
1 Dinding pas. 1/2 bata camp. 1PC:4PP 185.77 M2
2 Plesteran 1:4 343.22 M2
3 Acian 343.22 M2

V PEKERJAAN PINTU & JENDELA


1 Kusen pintu P1 0.09 M3
2 Kusen pintu P2 0.07 M3
3 Kusen jendela J1 0.27 M3
4 Kusen jendela J2 0.03 M3
5 Daun pintu P1 3.36 M2
6 Daun pintu P2 3.36 M2
Daun pintu P3 (toilet) 2.00 Unit
7 Daun lubang angin P1 0.64 M2
8 Daun lubang angin J1 1.92 M2
9 Daun jendela J1 5.76 M2
10 Daun jendela J2 0.40 M2
11 Jerjak besi 8.72 M2

VI PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Lantai keramik unpolished uk. 40 cm x 40 cm 11.80 M2
2 Lantai keramik polished uk. 40 cm x 40 cm 60.89 M2
3 Lantai keramik km/wc uk. 25 cm x 25 cm 6.00 M2
4 Keramik dinding km/wc uk. 25 cm x 40 cm 25.20 M2
5 Keramik meja dapur 40 cm x 40 cm 1.20 M2
6 Keramik dinding dapur uk. 25 cm x 40 cm 3.12 M2

VII PEKERJAAN SANITASI


1 Kloset jongkok 1.00 Unit
2 Kloset duduk + aksesoris lengkap terpasang 1.00 Set
3 Keran air 2.00 Buah
4 Shower tanam 1.00 Set
5 Floor drain 2.00 Buah
6 Wastafel + keran + aksesorris lengakap terpas 1.00 Set
7 Sink 1 lubang 1.00 Unit
8 Keraan leher angsa 1.00 Buah
9 Pipa air besih Ø1/2" 21.00 M`
10 Pipa limbah cair Ø4" 21.00 M`
11 Pipa limbah padat Ø3" 16.00 M`
12 Septic tank portable 1.00 Unit

VIII PEKERJAAN PLAFOND & ATAP


1 Atap zinkalum #0,35 mm, rangka baja ringan 108.24 M2
Lisplang GRC 29.60 M`
2 Plafond gypsum, rangka furing 100.86 M2

IX PEKERJAAN INSTALASI LISTRIK


1 Instalasi titik api 10.00 Titik
2 Instalasi titik stop kontak 6.00 Titik
3 Lampu LED 13 Watt + aksesoris lengkap terpa 8.00 Set
4 Lampu LED 10 Watt + aksesoris lengkap terpa 2.00 Set
5 Saklar tunggal 4.00 Buah
6 Saklar ganda 3.00 Buah
8 Stop kontak 6.00 Buah
9 MCB + box 1.00 Set

X PEKERJAAN PENGECATAN
1 Cat tembok 343.22 M2
2 Cat pintu/jendela 44.41 M2
HARGA (RP)