1 2 3 4
B PEKERJAAN BETON
1 Kolom Pedestal KPd ( 30/40 ) Beton Bertulang K-225 (fc = 18,68 Mpa) m3 1.68
2 Kolom Gewel KGw ( 12/20 ) Beton Bertulang K-225 (fc = 18,68 Mpa) m3 0.21
3 Kolom KP (12/12) Praktis Beton Bertulang (1Pc 2 Ps 3 Kr) m3 1.03
4 Balok Gewel BGw (15/30), Beton Bertulang (1Pc 2 Ps 3 Kr) m3 0.92
5 Balok Latei BL (12/25 ) Beton Bertulang Elv.+10.96 ( 1Pc 2 Ps 3 Kr) m3 1.47
6 Plat Kanopy t = 10 cm, Beton Bertulang ( 1Pc 2 Ps 3 Kr) m3 1.25
7 Plat Meja Wastafel t = 10 cm, Beton Bertulang ( 1Pc 2 Ps 3 Kr) m3 0.09
1 2 3 4
2 Pasang Keramik Lantai 40x40 cm Warna/Motif (unPolished) m2 70.45
3 Pasang Keramik Lantai 30x30 cm Warna/Motif (unPolished) m2 6.11
4 Pasang Plint Lantai Granite Tile 10x60 cm m1 167.23
5 Pasang Keramik Dinding 30x60 cm Warna/Motif m2 184.07
6 Pasang Keramik Meja Wastafel 30x60 cm Warna/Motif m2 1.15
G PEKERJAAN PLAFON
1 Pas. Plafon Kalsiboard t= 4,5 mm, Rangka Metal Furing m2 197.30
2 Pas. List Plafon Gypsum t = 10 cm m1 105.90
No Uraian Pekerjaan Sat Volume
1 2 3 4
H PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam Baru m2 693.29
2 Pengecatan Dinding Luar Baru m2 415.17
3 Cat Plafon + List Plafon m2 197.30
4 Cat Listplank (Kalsiplank ) m2 18.56
I PEKERJAAN ATAP
1 Pek. Pasang Rangka Atap Baja WF 150.75.5.7 kg 1,565.20
2 Pek. Pasang Gording C 150.65.20.2,3 kg 1,632.40
3 Pas. Besi Siku L 70.70.7 Penahan Gording kg 38.50
Pek. Plat Besi
4 Plat Pengaku t = 8 mm kg 41.54
5 Plat Joint t = 10 mm kg 52.10
6 Plat Plendes t = 10 mm kg 117.75
Pek. Track Stank & Ikatan Angin
7 Penggantung Gording dia. 12 mm kg 201.34
8 Pasang Baut HTB 12 (Pengikat Gording) bh 70.00
9 Ikatan Angin dia. 16 mm kg 183.06
10 Jarum Keras 5/8 bh 21.00
11 Pasang Baut HTB 12 bh 250.00
12 Pasang Baut Angkur 16 Kedalaman 60 cm bh 40.00
Pek. Penutup Atap
13 Pasang Reng + Usuk Galvalum (Luasan Miring) m2 258.85
14 Pasang Atap Genteng Karang Pilang (Luasan Miring) m2 258.85
15 Pasang Bubungan Atap Genteng Karang Pilang m1 21.20
16 Pemasangan Flashing m1 19.54
17 Pas. Listplank Kalsiplank 30 cm m1 46.40
J PEKERJAAN SANITASI
1 Pas. Instalasi Air Bersih Pipa PVC Type AW 3/4 m1 28.00
2 Pas. Instalasi Air Bersih Pipa PVC Type AW 1/2 m1 6.00
3 Pas. Instalasi Air Bekas Pipa PVC Type AW 3 m1 14.00
4 Pas. Instalasi Air Kotor Pipa PVC Type AW 4 m1 10.30
5 Pas. Kran Air Standar Steinless bh 3.00
6 Pas. Kran Air Wastafel Steinless bh 2.00
7 Pas. Closed Jongkok Porcelain bh 3.00
8 Pas. Wastafel Meja + Asesories bh 2.00
9 Pekerjaan Cermin tb. 6mm (Wastafel) m2 0.64
10 Pas. Tempat Sabun Porcelain bh 3.00
11 Pas. FloorDrain (Steinless) bh 3.00
12 Pas. Roof Drain (Cast Iron) bh 8.00
1 2 3 4
- Pas. MCB 1 Phase 10A bh 2.00
- Upah Pasang ls. 1.00
2 Pas. Instalasi Titik Lampu Fitting Plafon ttk 28.00
3 Pas. Instalasi titik Stop kontak + Stop Kontak ttk 6.00
4 Pas. Instalasi titik Stop kontak + Stop Kontak AC ttk 6.00
5 Pas. Lampu LED 13 watt bh 12.00
6 Pas. Lampu LED 7 watt bh 13.00
7 Pas. Lampu LED 5 watt bh 3.00
8 Pas. Saklar tunggal bh 5.00
9 Pas. Saklar Ganda bh 4.00
M PEKERJAAN LAIN-LAIN
1 Pas. Tangga Monyet Pipa Besi Galvanis Dia. 2,5 Finishing Cat Besi unit 1.00
2 Pas. Tutup Manhole Shaft Rangka Siku & Plat Besi Tb. 2 mm Finish Cat Besi unit 1.00
3 Pembersihan Akhir Pekerjaan Gedung A ls. 1.00
Terbilang :
#NAME?
unan Gedung Type B2 ((SDN SAWAHAN IV/343) )
1,985,055.10 1,985,055.10
397,532.18 397,532.18
49,919.50 998,390.00
2,791.00 699,843.25
153,732.00 18,447,840.00
Jumlah 22,528,660.53
3,516,262.66 5,907,321.27
5,676,101.74 1,169,276.96
4,309,100.41 4,429,755.22
3,646,957.67 3,336,966.27
3,867,801.21 5,685,667.78
3,770,139.10 4,701,363.46
3,770,139.10 350,622.94
Jumlah 25,580,973.89
109,748.20 5,260,121.48
104,854.20 30,103,535.97
Jumlah 35,363,657.44
71,051.70 4,290,812.16
68,335.70 51,539,809.98
43,614.90 35,528,915.61
43,614.90 1,434,145.14
22,375.30 698,109.36
22,375.30 17,026,708.29
29,058.20 4,476,996.87
Jumlah 114,995,497.42
2,958,919.42 8,876,758.26
2,683,449.84 8,050,349.52
998,157.59 998,157.59
3,068,075.02 27,612,675.18
731,670.34 4,390,022.04
1,325,466.23 2,650,932.46
702,400.64 2,107,201.92
256,659.39 4,512,072.08
Jumlah 59,198,169.05
204,949.00 33,127,956.36
Harga Satuan Jumlah Harga
(Rp) (Rp)
5 6= (4x5)
204,949.00 14,438,657.05
202,849.00 1,238,393.15
36,736.80 6,143,495.06
272,622.20 50,181,023.11
272,622.20 312,152.42
Jumlah 105,441,677.15
120,174.00 23,710,330.20
17,054.20 1,806,039.78
Jumlah 25,516,369.98
Harga Satuan Jumlah Harga
(Rp) (Rp)
5 6= (4x5)
23,279.70 16,139,490.09
25,589.70 10,623,998.98
23,717.00 4,679,364.10
23,717.00 440,187.52
Jumlah 31,883,040.69
22,626.30 35,414,684.76
24,626.30 40,199,972.12
24,626.30 948,112.55
32,790.36 1,362,177.14
32,790.36 1,708,508.92
32,790.36 3,861,064.89
11,754.50 2,366,698.05
2,500.00 175,000.00
11,754.50 2,151,755.26
85,000.00 1,785,000.00
2,500.00 625,000.00
45,000.00 1,800,000.00
101,584.50 26,295,350.99
118,179.30 30,590,948.16
131,660.60 2,791,204.72
74,863.50 1,462,533.34
81,738.50 3,792,666.40
Jumlah 157,330,677.30
19,314.20 540,797.60
18,099.20 108,595.20
72,313.20 1,012,384.80
102,688.20 1,057,688.46
79,414.00 238,242.00
109,414.00 218,828.00
430,776.00 1,292,328.00
1,265,170.00 2,530,340.00
160,441.30 102,682.43
27,912.50 83,737.50
50,912.50 152,737.50
70,912.50 567,300.00
Jumlah 7,905,661.49
216,952.30 216,952.30
45,000.00 180,000.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
5 6= (4x5)
50,000.00 100,000.00
150,000.00 150,000.00
187,705.00 5,255,740.00
107,452.30 644,713.80
167,452.30 1,004,713.80
45,000.00 540,000.00
32,000.00 416,000.00
20,000.00 60,000.00
41,952.30 209,761.50
41,952.30 167,809.20
Jumlah 8,945,690.60
2,511,866.77 2,511,866.77
Jumlah 2,511,866.77
5,210,063.52 5,210,063.52
778,689.71 778,689.71
2,596,920.00 2,596,920.00
Jumlah 8,585,673.23
TOTAL 605,787,615.53
PPn 10% 60,578,761.55
JUMLAH TOTAL 666,366,377.09
PEMBULATAN 666,366,300.00
#NAME?
DAFTAR HARGA SATUAN POKOK KEGIATAN
(HSPK)
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
BANGUNAN GEDUNG
Upah:
Kepala Tukang / Mandor 0.0101 O.H 127,300.00
Kepala Tukang / Mandor 0.0045 O.H 127,300.00
Tukang 0.1009 O.H 127,300.00
Pembantu Tukang 0.1010 O.H 127,300.00
Jumlah:
Bahan/Material:
Kayu Meranti (Papan 2/20) 0.0080 m3 Err:509
Kayu Meranti Usuk 4/6, 5/7 0.0120 m3 1,100,000.00
Paku Biasa 2 - 5 inchi 0.0500 Doz 11,000.00
Jumlah:
Nilai HSPK :
SNI 2835:2008 (6.1)
Penggalian Tanah Biasa untuk Konstruksi m3
Upah:
Kepala Tukang / Mandor 0.0252 O.H 127,300.00
Pembantu Tukang 0.7572 O.H 127,300.00
Jumlah:
Alat :
Pompa Air 0.6000 jam Err:509
Jumlah:
Nilai HSPK :
Pembongkaran Beton m3
Upah:
Kepala Tukang / Mandor 0.4000 O.H 127,300.00
Pembantu Tukang 4.0000 O.H 127,300.00
Jumlah:
Nilai HSPK :
SNI 03-2835-2002 pek.tanah bangun
Pengurugan Tanah Kembali untuk Konstruksi m2
sederhana (6.8)
Upah:
Kepala Tukang / Mandor 0.0504 O.H 127,300.00
Pembantu Tukang 0.5048 O.H 127,300.00
Jumlah:
Nilai HSPK :
Pengurugan Pasir (PADAT) m3 SNI 2835:2008 (6.11)
Upah:
Kepala Tukang / Mandor 0.0101 O.H 127,300.00
Pembantu Tukang 0.3029 O.H 127,300.00
Jumlah:
Bahan:
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Pasir Urug 1.2000 m3 60,000.00
Jumlah:
Nilai HSPK :
Pengurugan Sirtu (PADAT) m3 SNI 2835:2008 (6.15)
Upah:
Kepala Tukang / Mandor 0.0252 O.H 127,300.00
Pembantu Tukang 0.2524 O.H 127,300.00
Jumlah:
Bahan:
Sirtu 1.2000 m3 Err:509
Jumlah:
Sewa Peralatan:
Sewa Stemper 0.0088 Jam Err:509
Jumlah:
Nilai HSPK :
Pengangkutan Tanah keluar Proyek m3
Upah:
Pembantu Tukang 0.2524 O.H 127,300.00
Jumlah:
Bahan:
Sewa Dump Truk 5 Ton 0.2500 jam 65,000.00
Jumlah:
Nilai HSPK :
Pengangkutan Tanah Sejauh 30 Meter m3 SNI 2835:2008 (6.8)
Upah:
Kepala Tukang / Mandor 0.0101 O.H 127,300.00
Pembantu Tukang 0.3332 O.H 127,300.00
Jumlah:
Nilai HSPK :
Pengurugan Sirtu Dengan Pemadatan
m3
Menggunakan Alat Berat
Upah:
Kepala Tukang / Mandor 0.0212 O.H 127,300.00
Pembantu Tukang 0.2524 O.H 127,300.00
Jumlah:
Bahan:
Sirtu 1.2000 m3 Err:509
Jumlah:
Sewa Peralatan:
Sewa Dump Truk 5 Ton 0.0880 Jam 65,000.00
Sewa Motor Grader 125 - 140 pk Min 5 jam 0.0080 Jam Err:509
Sewa Pneumatic Tire Roller Min 5 jam 0.0040 Jam Err:509
Sewa Truk Tangki Air min 5 jam 0.0120 Jam Err:509
Sewa Vibrator Roller Min 5 jam 0.0120 Jam Err:509
Sewa Escavator 6m3 0.0220 Jam Err:509
Jumlah:
Nilai HSPK :
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Pemasangan Trucuk Bambu dia 10-12 cm P.1.5m SNI DT 91-0007-2007 (6.2)
btg
Tenaga:
Kepala Tukang / Mandor 0.0025 O.H 127,300.00
Tukang Batu 0.0404 O.H 127,300.00
Pembantu Tukang 0.0505 O.H 127,300.00
Jumlah:
Bahan:
Bambu Bongkotan dia 10-12 cm P. 3.00 m 0.5000 btg Err:509
Jumlah:
Nilai HSPK :
Pekerjaan Pemasangan Batu Kali Belah 15/20 cm SNI 2836:2008 (6.2)
m3
(1 Pc : 4 Ps)
Tenaga:
Kepala Tukang / Mandor 0.0756 O.H 127,300.00
Kepala Tukang / Mandor 0.0756 O.H 127,300.00
Tukang Batu 0.7567 O.H 127,300.00
Pembantu Tukang 1.5144 O.H 127,300.00
Jumlah:
Bahan:
Semen portland (50kg) 3.2600 Zak 58,000.00
Pasir Pasang 0.5200 m3 100,000.00
Batu Kali Belah 15/20 cm 1.2000 m3 Err:509
Jumlah:
Nilai HSPK :
Pembuatan Lubang Strous Pile diameter 30 cm m'
Upah:
Kepala Tukang / Mandor 0.0726 O.H 127,300.00
Pembantu Tukang 1.4539 O.H 127,300.00
Jumlah:
Sewa Peralatan:
Sewa Alat Bantu Strouss Pile 1.2000 Jam Err:509
Jumlah:
Nilai HSPK : Nilai HSPK :
Kedalaman 1 m 0.3333
Pemakaian Spesi Campuran Strous Pile (1 Pc :
m3
1,5 Ps : 2,5 Kr)
Upah:
Kepala Tukang / Mandor 0.0252 O.H 127,300.00
Kepala Tukang / Mandor 0.0807 O.H 127,300.00
Tukang 0.2522 O.H 127,300.00
Pembantu Tukang 1.6659 O.H 127,300.00
Jumlah:
Bahan:
Semen PC (Portland Cement) 50 kg 7.1603 Zak 58,000.00
Pasir Cor 0.4882 m3 110,000.00
Batu Krikil 0.8137 m3 Err:509
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Pekerjaan Pembesian 130.0000 kg 11,758.58
Jumlah:
Nilai HSPK :
Pekerjaan Beton K-175 m3 SNI 7394:2008 (6.5)
Upah:
Kepala Tukang / Mandor 0.0282 O.H 127,300.00
Tukang 0.2775 O.H 127,300.00
Pembantu Tukang 1.6659 O.H 127,300.00
Jumlah:
Bahan:
Semen portland 40kg 8.1500 zak 42,000.00
Pasir Beton 0.4806 m3 110,000.00
Batu pecah Mesin 1/2 cm 0.5416 m3 135,000.00
Air ( Biaya Air Tawar ) 215.0000 liter 10.00
Jumlah:
Nilai HSPK :
Pekerjaan Beton K-225 m3 SNI 7394:2008 (6.7)
Upah:
Kepala Tukang / Mandor 0.0282 O.H 127,300.00
Tukang 0.2775 O.H 127,300.00
Pembantu Tukang 1.6659 O.H 127,300.00
Jumlah:
Bahan:
Semen portland 40kg 9.2750 zak 42,000.00
Pasir Beton 0.4363 m3 110,000.00
Batu pecah Mesin 1/2 cm 0.5511 m3 135,000.00
Air ( Biaya Air Tawar ) 215.0000 liter 10.00
Jumlah:
Nilai HSPK :
Pekerjaan Beton K-250 m3 SNI 7394:2008 (6.8)
Upah:
Kepala Tukang / Mandor 0.0282 O.H 127,300.00
Tukang 0.2775 O.H 127,300.00
Pembantu Tukang 1.6659 O.H 127,300.00
Jumlah:
Bahan:
Semen portland (40kg) 9.6000 zak 42,000.00
Pasir Beton 0.4325 m3 110,000.00
Batu pecah Mesin 1/2 cm 0.5468 m3 135,000.00
Air ( biaya air tawar ) 215.0000 liter 10.00
Jumlah:
Nilai HSPK :
Pekerjaan Beton K-300 m3 SNI 7394:2008 (6.10)
Upah:
Kepala Tukang / Mandor 0.0282 O.H 127,300.00
Tukang 0.2775 O.H 127,300.00
Pembantu Tukang 1.6659 O.H 127,300.00
Jumlah:
Bahan:
Semen portland (40kg) 10.3250 zak 42,000.00
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Pasir Beton 0.4256 m3 110,000.00
Batu pecah Mesin 1/2 cm 0.5374 m3 135,000.00
Air ( biaya air tawar ) 215.0000 liter 10.00
Jumlah:
Nilai HSPK :
Pekerjaan Beton ( 1Pc : 2 Ps : 3 Kr) m3 SNI 7394:2008 (6.17)
Upah:
Kepala Tukang / Mandor 0.0282 O.H 127,300.00
Tukang 0.2775 O.H 127,300.00
Pembantu Tukang 1.6659 O.H 127,300.00
Jumlah:
Bahan:
Semen portland (40kg) 9.2750 zak 42,000.00
Pasir Beton 0.4363 m3 110,000.00
Batu pecah Mesin 1/2 cm 0.5511 m3 135,000.00
Air ( biaya air tawar ) 215.0000 liter 10.00
Jumlah:
Nilai HSPK :
Pekerjaan Pembesian Dengan Besi Beton
Kg SNI 7394:2008 (6.17)
(polos/ulir)
Upah:
Kepala Tukang / Mandor 0.0007 O.H 127,300.00
Tukang 0.0071 O.H 127,300.00
Pembantu Tukang 0.0071 O.H 127,300.00
Jumlah:
Bahan:
Besi Beton ( polos / ulir ) 1.0500 kg 8,800.00
Kawat Beton 0.0150 kg 42,000.00
Jumlah:
Nilai HSPK :
Pekerjaan Bekisting Sloof & Poer m2 SNI 7394:2008 (6.21)
Upah:
Kepala Tukang / Mandor 0.0333 O.H 127,300.00
Tukang 0.3330 O.H 127,300.00
Pembantu Tukang 0.6664 O.H 127,300.00
Jumlah:
Bahan:
Kayu meranti Balok 0.0180 m3 1,100,000.00
Multiplek 110 x 244 x 9 mm 0.3500 lbr Err:509
Paku usuk 0.3000 kg 11,000.00
Minyak bekisting 0.1000 liter 6,600.00
Jumlah:
Nilai HSPK :
Pekerjaan Bekisting Kolom m2 SNI 7394:2008 (6.22)
Upah:
Kepala Tukang / Mandor 0.0333 O.H 127,300.00
Tukang 0.3330 O.H 127,300.00
Pembantu Tukang 0.6664 O.H 127,300.00
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Jumlah:
Bahan:
Kayu Meranti Balok 0.0150 m3 1,100,000.00
Multiplek 110 x 244 x 12 mm Film Satu Muka 0.3500 lbr 180,000.00
Paku usuk 0.4000 kg 11,000.00
Minyak bekisting 0.2000 liter 6,600.00
Steger / Perancah 1.0000 set Err:509
Jumlah:
Nilai HSPK :
Pekerjaan Bekisting Balok m2 SNI 7394:2008 (6.22)
Upah:
Kepala Tukang / Mandor 0.0333 O.H 127,300.00
Tukang 0.3330 O.H 127,300.00
Pembantu Tukang 0.6664 O.H 127,300.00
Jumlah:
Bahan:
Kayu Meranti Balok 0.0180 m3 1,100,000.00
Multiplek 110 x 244 x 12 mm Film Satu Muka 0.3500 lbr 180,000.00
Paku usuk 0.4000 kg 11,000.00
Minyak bekisting 0.2000 liter 6,600.00
Steger / Perancah 1.0000 set Err:509
Jumlah:
Nilai HSPK :
Pekerjaan Bekisting Lantai m2 SNI 7394:2008 (6.24)
Upah:
Kepala Tukang / Mandor 0.0333 O.H 127,300.00
Tukang 0.3330 O.H 127,300.00
Pembantu Tukang 0.6664 O.H 127,300.00
Jumlah:
Bahan:
Kayu Meranti Balok 0.0150 m3 1,100,000.00
Multiplek 110 x 244 x 12 mm Film satu muka 0.3500 lbr 180,000.00
Paku usuk 0.4000 kg 11,000.00
Minyak bekisting 0.2000 liter 6,600.00
Steger / Perancah 1.0000 set Err:509
Jumlah:
Nilai HSPK :
SNI 03-2835-2002 pek.persiapan dan pek
Pembongkaran Begesting m2
bangunan sederhana (6.8)
Upah:
Kepala Tukang / Mandor 0.0250 O.H 127,300.00
Pembantu Tukang 0.0500 O.H 127,300.00
Jumlah:
Nilai HSPK :
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Pekerjaan Strous Pile dia 30 CM - 8 M (124 kg
m3
besi)
Upah:
Kepala Tukang / Mandor 0.0353 O.H 127,300.00
Kepala Tukang / Mandor 0.0353 O.H 127,300.00
Tukang 0.3531 O.H 127,300.00
Pembantu Tukang 0.7067 O.H 127,300.00
Jumlah:
Bahan:
Semen PC 50 Kg 0.1960 Zak 58,000.00
Semen Berwarna Yiyitan 1.3000 Kg 6,000.00
Pasir Pasang 0.0450 m3 100,000.00
Tegel Keramik Uk. 40x40 Cm (motif / warna gelap) 1.0608 m2 40,000.00
Jumlah:
Nilai HSPK :
Pemasangan Tegel Keramik Unpolish 40x40 cm
m2
(Motif/Warna Gelap) SNI DT 91-0012-2007 (6.11) & (6.35
Upah:
Kepala Tukang / Mandor 0.0353 O.H 127,300.00
Kepala Tukang / Mandor 0.0353 O.H 127,300.00
Tukang 0.3531 O.H 127,300.00
Pembantu Tukang 0.7067 O.H 127,300.00
Jumlah:
Bahan:
Semen PC (Portland Cement) 40 kg 0.2450 Zak 42,000.00
Semen Berwarna Yiyitan 1.3000 Kg 6,000.00
Pasir Pasang 0.0450 m3 100,000.00
Tegel Keramik 40x40 (motif/warna gelap) 1.0608 m2 Err:509
Jumlah:
Nilai HSPK :
Pemasangan Tegel Keramik 30x60 cm (Dinding) m2
SNI DT 91-0012-2007 (6.54)
Upah:
Kepala Tukang / Mandor 0.0450 O.H 127,300.00
Kepala Tukang / Mandor 0.0450 O.H 127,300.00
Tukang 0.4500 O.H 127,300.00
Pembantu Tukang 0.9000 O.H 127,300.00
Jumlah:
Bahan:
Semen PC (Portland Cement) 40 kg 0.2325 Zak 42,000.00
Semen Berwarna Yiyitan 1.9400 Kg 6,000.00
Pasir Pasang 0.0180 m3 100,000.00
Tegel Keramik 30 x 60 Cm (dinding) 1.0500 m2 45,000.00
Jumlah:
Nilai HSPK :
Pemasangan Granit Hitam 30x60 cm (Meja
m2
Washtafel) SNI DT 91-0012-2007 (6.54)
Upah:
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Kepala Tukang / Mandor 0.0450 O.H 127,300.00
Kepala Tukang / Mandor 0.0450 O.H 127,300.00
Tukang 0.4500 O.H 127,300.00
Pembantu Tukang 0.9000 O.H 127,300.00
Jumlah:
Bahan:
Semen PC 40 Kg 0.2325 Zak 42,000.00
Semen Berwarna Yiyitan 1.9400 Kg 6,000.00
Pasir Pasang 0.0180 m3 100,000.00
Granit Hitam 30x60 1.0500 m2 Err:509
Jumlah:
Nilai HSPK :
Pemasangan Keramik Border 10 x 40 cm
m' SNI DT 91-0012-2007 (6.48)
(Dinding)
Upah:
Kepala Tukang / Mandor 0.0050 O.H 127,300.00
Kepala Tukang / Mandor 0.0090 O.H 127,300.00
Tukang 0.0900 O.H 127,300.00
Pembantu Tukang 0.0900 O.H 127,300.00
Jumlah:
Bahan:
Semen PC 40 Kg 0.0285 Zak 42,000.00
Semen Berwarna Yiyitan 0.0313 Kg 6,000.00
Pasir Pasang 0.0030 m3 100,000.00
Tegel Porselen 2.6500 bh 6,000.00
Jumlah:
Nilai HSPK :
Pemasangan Tegel Keramik Lantai 30x30 cm m2 SNI 7395:2008 (6.35)
Upah:
Kepala Tukang / Mandor 0.0353 O.H 127,300.00
Kepala Tukang / Mandor 0.0353 O.H 127,300.00
Tukang 0.3531 O.H 127,300.00
Pembantu Tukang 0.7067 O.H 127,300.00
Jumlah:
Bahan:
Semen PC 50 Kg 0.2000 Zak 58,000.00
Semen Berwarna Yiyitan 0.5000 Kg 6,000.00
Pasir Pasang 0.0450 m3 100,000.00
Tegel Keramik 30 x 30 Cm 1.0500 m2 38,000.00
Jumlah:
Nilai HSPK :
Pemasangan Batu Andesit Alur + Coating m2 SNI DT 91-0012-2007 (6.54)
Upah:
Kepala Tukang / Mandor 0.0450 O.H 127,300.00
Kepala Tukang / Mandor 0.0450 O.H 127,300.00
Tukang 0.4500 O.H 127,300.00
Pembantu Tukang 0.9000 O.H 127,300.00
Jumlah:
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Bahan:
Semen PC 40 Kg 0.1860 Zak 42,000.00
Semen Berwarna Yiyitan 1.9400 Kg 6,000.00
Pasir Pasang 0.0180 m3 100,000.00
Batu Andesit Alur 20 x 40 Cm 1.0600 m2 Err:509
Coating 0.1500 ltr Err:509
Jumlah:
Nilai HSPK :
Pemasangan Batu Templek Garut + Coating m2 SNI DT 91-0012-2007 (6.54)
Upah:
Kepala Tukang / Mandor 0.0450 O.H 127,300.00
Kepala Tukang / Mandor 0.0450 O.H 127,300.00
Tukang 0.4500 O.H 127,300.00
Pembantu Tukang 0.9000 O.H 127,300.00
Jumlah:
Bahan:
Semen PC 40 Kg 0.1860 Zak 42,000.00
Semen Berwarna Yiyitan 1.9400 Kg 6,000.00
Pasir Pasang 0.0180 m3 100,000.00
Batu Templek Lempengan Garut Hitam 1.0600 m2 Err:509
Coating 0.1500 ltr Err:509
Jumlah:
Nilai HSPK :
Pemasangan Tegel Plin Dinding Keramik uk.
m' SNI 7395:2008 (6.39)
7.5x20 cm
Upah:
Kepala Tukang / Mandor 0.0091 O.H 127,300.00
Kepala Tukang / Mandor 0.0050 O.H 127,300.00
Tukang 0.0908 O.H 127,300.00
Pembantu Tukang 0.0909 O.H 127,300.00
Jumlah:
Bahan:
Semen PC 50 Kg 0.0228 Zak 58,000.00
Semen Berwarna Yiyitan 0.0250 Kg 6,000.00
Pasir Pasang 0.0030 m3 100,000.00
Keramik (Plint) Uk. 7,5 x 20 Cm 5.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Pekerjaan Perakitan dan pemasangan Baja WF SNI 7393:2008 (6.2)
Upah:
Kepala Tukang / Mandor 0.0030 O.H 127,300.00
Kepala Tukang / Mandor 0.0060 O.H 127,300.00
Tukang 0.0605 O.H 127,300.00
Pembantu Tukang 0.0606 O.H 127,300.00
Jumlah:
Bahan:
Besi Profil WF >= 200 mm 1.1500 Kg 4,000.00
Electrode Baja 0.0400 Kg Err:509
Meni Besi 0.0300 Kg 25,000.00
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Jumlah:
Nilai HSPK :
Pekerjaan Perakitan dan pemasangan Baja Canal
Upah:
Kepala Tukang / Mandor 0.0030 O.H 127,300.00
Kepala Tukang / Mandor 0.0060 O.H 127,300.00
Tukang 0.0600 O.H 127,300.00
Pembantu Tukang 0.0030 O.H 127,300.00
Jumlah:
Bahan:
Besi Canal 1.1000 Kg 6,000.00
Electrode Baja 0.0400 Kg Err:509
Meni Besi 0.0300 Kg 25,000.00
Jumlah:
Nilai HSPK :
Pekerjaan Perakitan dan pemasangan Baja L
Upah:
Kepala Tukang / Mandor 0.0030 O.H 127,300.00
Kepala Tukang / Mandor 0.0060 O.H 127,300.00
Tukang 0.0600 O.H 127,300.00
Pembantu Tukang 0.0030 O.H 127,300.00
Jumlah:
Bahan:
Besi L 1.1000 Kg Err:509
Electrode Baja 0.0400 Kg Err:509
Meni Besi 0.0300 Kg 25,000.00
Jumlah:
Nilai HSPK :
Pekerjaan Perakitan dan pemasangan Plat Baja
10 mm
Upah:
Kepala Tukang / Mandor 0.0030 O.H 127,300.00
Kepala Tukang / Mandor 0.0060 O.H 127,300.00
Tukang 0.0600 O.H 127,300.00
Pembantu Tukang 0.0030 O.H 127,300.00
Jumlah:
Bahan:
Baja Plat 10 mm 1.1000 Kg Err:509
Electrode Baja 0.0400 Kg Err:509
Meni Besi 0.0300 Kg 25,000.00
Jumlah:
Nilai HSPK :
Pekerjaan Perakitan dan pemasangan Plat Baja
12 mm
Upah:
Kepala Tukang / Mandor 0.0030 O.H 127,300.00
Kepala Tukang / Mandor 0.0060 O.H 127,300.00
Tukang 0.0600 O.H 127,300.00
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Pembantu Tukang 0.0030 O.H 127,300.00
Jumlah:
Bahan:
Baja Plat 12 mm 1.1000 Kg 13,059.70
Electrode Baja 0.0400 Kg Err:509
Meni Besi 0.0300 Kg 25,000.00
Jumlah:
Nilai HSPK :
Pemasang rangka atap Galvalume (Usuk Reng) m2
Tenaga:
Kepala Tukang / Mandor 0.0050 O.H 127,300.00
Kepala Tukang / Mandor 0.0100 O.H 127,300.00
Tukang 0.1000 O.H 127,300.00
Pembantu Tukang 0.2000 O.H 127,300.00
Jumlah:
Bahan:
Usuk Galvalume C 75 2.1000 m' 5,500.00
Reng Galvalume R 45 5.1000 m' 2,500.00
Srup/Drll Screw 8.0000 bh 500.00
Jumlah:
Nilai HSPK :
Penggantung Gording kg
Upah:
Kepala Tukang / Mandor 0.0140 O.H. 127,300.00
Tukang 0.0077 O.H. 127,300.00
Pembantu Tukang 0.0160 O.H. 127,300.00
Jumlah:
Bahan:
Mur Baut 2.0000 Buah Err:509
Baja Tulangan Polos 0.8000 Kg 8,800.00
Electrode Baja 0.1000 Kg 15,000.00
Jumlah:
Sewa Peralatan:
Sewa Welding Set 0.0070 Jam 1,500.00
Jumlah:
Nilai HSPK :
Bracing Ikatan Angin kg
Upah:
Kepala Tukang / Mandor 0.0140 O.H. 127,300.00
Tukang 0.0077 O.H. 127,300.00
Pembantu Tukang 0.0160 O.H. 127,300.00
Jumlah:
Bahan:
Walter Moer 0.3000 Buah Err:509
Baja Tulangan Polos 1.5833 Kg 8,800.00
Plat Besi Tebal 1 cm 0.0004 Kg Err:509
Electrode Baja 0.1000 Kg 15,000.00
Jumlah:
Sewa Peralatan:
Sewa Welding Set 0.0700 Jam 1,500.00
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Jumlah:
Nilai HSPK :
Pemasangan Modul Pagar BRC m2
Upah:
Tukang Besi 0.2625 O.H 127,300.00
Pembantu Tukang 0.2625 O.H 127,300.00
Jumlah:
Bahan:
Pagar BRC dia 6mm, P. 240 cm, T. 90 cm 0.4630 m2 Err:509
Pipa Besi Galvanis Ø2" 1.5000 m' Err:509
Jumlah:
Nilai HSPK :
Pemasangan Modul Pintu P1 BRC 102cm x 90cm unit
Upah:
Tukang Besi 0.7000 O.H 127,300.00
Pembantu Tukang 0.7000 O.H 127,300.00
Jumlah:
Bahan:
Pagar BRC dia 6mm, P. 240 cm, T. 90 cm 0.4250 unit Err:509
Pipa Besi Galvanis Ø2" 5.7600 m' Err:509
Engsel Besi 2.0000 bh Err:509
Grendel Besi 1.0000 bh Err:509
Kunci gembok 1.0000 bh Err:509
Jumlah:
Nilai HSPK :
Pemasangan Genteng Karang Pilang / Wisma m2 SNI 2002 Pekerjaan Penutup Atap (6
Upah:
Kepala Tukang / Mandor 0.0081 O.H 127,300.00
Kepala Tukang / Mandor 0.0081 O.H 127,300.00
Tukang 0.0757 O.H 127,300.00
Pembantu Tukang 0.1514 O.H 127,300.00
Jumlah:
Bahan:
Genteng Karang Pilang / Wisma 32 x 31,4 cm 25.0000 Buah 3,500.00
Jumlah:
Nilai HSPK :
Pemasang Penutup Atap UPVC m2
Upah:
Kepala Tukang / Mandor 0.0080 O.H 127,300.00
Kepala Tukang / Mandor 0.0080 O.H 127,300.00
Tukang 0.0750 O.H 127,300.00
Pembantu Tukang 0.1500 O.H 127,300.00
Jumlah:
Bahan:
Atap UPVC Doff 1.1000 m2 Err:509
Paku Sumbat 9.0000 Buah Err:509
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Jumlah:
Nilai HSPK :
Pemasangan Wuwung / Top Ridge UPVC m1
Upah:
Kepala Tukang / Mandor 0.0080 O.H 127,300.00
Kepala Tukang / Mandor 0.0080 O.H 127,300.00
Tukang 0.0750 O.H 127,300.00
Pembantu Tukang 0.1500 O.H 127,300.00
Jumlah:
Bahan:
Top Ridge UPVC 1.2500 bh Err:509
Paku Sumbat 9.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Pemasangan Wuwung Genteng Type Karang pilang m1 SNI 2002 Pekerjaan Penutup Atap (6
Upah:
Kepala Tukang / Mandor 0.0202 O.H 127,300.00
Kepala Tukang / Mandor 0.0020 O.H 127,300.00
Tukang 0.2018 O.H 127,300.00
Pembantu Tukang 0.4039 O.H 127,300.00
Jumlah:
Bahan:
Semen PC 50 Kg 0.1600 Zak 58,000.00
Pasir Pasang 0.0323 m3 100,000.00
3.5000
Genteng Wuwung Karang Pilang Buah 8,000.00
Jumlah:
Nilai HSPK :
Pemasangan List Gypsum m2
Upah:
Mandor 0.0075 O.H 127,300.00
Kepala Tukang Kayu 0.0045 O.H 127,300.00
Tukang Kayu 0.0450 O.H 127,300.00
Pembantu Tukang 0.0150 O.H 127,300.00
Jumlah:
Bahan:
List Gypsum 1.0000 m1 10,000.00
Paku Sekrup 5.0000 Buah 150.00
Jumlah:
Nilai HSPK :
Plafond Kalsiboard 4,5 mm Rangka Hollow
m2
Metalfuring
Upah:
Kepala Tukang / Mandor 0.0750 O.H 127,300.00
Kepala Tukang / Mandor 0.0250 O.H 127,300.00
Tukang 0.2500 O.H 127,300.00
Pembantu Tukang 0.1500 O.H 127,300.00
Jumlah:
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Bahan:
Hollow 4/4 2.0000 m' 6,000.00
Hollow 2/4 2.0000 m' 4,000.00
Kalsiboard 4,5 mm 0.3819 Lembar 42,000.00
Skrup 9.0000 Buah 150.00
Jumlah:
Nilai HSPK :
Plafond Gypsumboard 9 mm Rangka Hollow
m2
Metalfuring
Upah:
Kepala Tukang / Mandor 0.0750 O.H 127,300.00
Kepala Tukang / Mandor 0.0250 O.H 127,300.00
Tukang 0.2500 O.H 127,300.00
Pembantu Tukang 0.1500 O.H 127,300.00
Jumlah:
Bahan:
Hollow 4/4 2.0000 m' 6,000.00
Hollow 2/4 2.0000 m' 4,000.00
Gypsumboard 9 mm 0.3819 Lembar Err:509
Skrup 9.0000 Buah 150.00
Jumlah:
Nilai HSPK :
Pasang Woodplank / kalsiplank m1
Upah:
Kepala Tukang / Mandor 0.0020 O.H 127,300.00
Kepala Tukang / Mandor 0.0200 O.H 127,300.00
Tukang 0.2000 O.H 127,300.00
Pembantu Tukang 0.4000 O.H 127,300.00
Jumlah:
Bahan:
Woodplank 10x300x4050 LAPIS 2 2.0000 m1 60,200.00
Rangka Besi L 50.50.5 mm 2.9460 kg Err:509
Jumlah:
Nilai HSPK :
Pemasangan Tulisan timbul dari Plat Stainless
unit
Stell 0,6 mm Tinggi 30 cm
Upah:
Tukang 3.8333 O.H 127,300.00
Pembantu Tukang 0.7188 O.H 127,300.00
Jumlah:
Bahan:
Plat Stainless Stell 450.0000 cm Err:509
Elektroda SS 1.0000 kg 15,000.00
Jumlah:
Alat
Sewa Alat Bantu 2.5000 jam 1,500.00
Jumlah:
Nilai HSPK :
Pemasangan Tulisan timbul dari Plat Stainless
unit
Stell 0,6 mm Tinggi 25 cm
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Upah:
Tukang 3.8333 O.H 127,300.00
Pembantu Tukang 0.7188 O.H 127,300.00
Jumlah:
Bahan:
Plat Stainless Stell 475.0000 cm Err:509
Elektroda SS 1.0000 kg 15,000.00
Jumlah:
Alat
Sewa Alat Bantu 2.5000 jam 1,500.00
Jumlah:
Nilai HSPK :
Pasang Flasing Alumunium m1
Upah:
Kepala Tukang / Mandor 0.0250 oh 127,300.00
Kepala Tukang / Mandor 0.0250 oh 127,300.00
Tukang 0.2000 oh 127,300.00
Pembantu Tukang 0.1000 oh 127,300.00
Jumlah:
Bahan:
Aluminium Sheet t=0,4 mm lebar 40 cm 0.6000 m' Err:509
Ripet 4.0000 Buah 550.00
Jumlah:
Nilai HSPK :
Pemasangan Kusen Alumunium Profil 4" Powder
m1
Coating Putih
Upah:
Kepala Tukang / Mandor 0.0043 O.H 127,300.00
Kepala Tukang / Mandor 0.0021 O.H 127,300.00
Tukang 0.0434 O.H 127,300.00
Pembantu Tukang 0.0434 O.H 127,300.00
Jumlah:
Bahan:
Aluminium Powder Coating Putih Uk. 4 x 10, Profil 4
1.1000 m1 80,000.00
inchi
Skrup 4 inchi / Ripet 2.0000 Buah 550.00
Sealent 0.0600 tube 15,000.00
Jumlah:
Nilai HSPK :
Pemasangan Slimar Alumunium Profil 3/8 "
m1
Powder Coating Putih
Upah:
Kepala Tukang / Mandor 0.0043 O.H 127,300.00
Kepala Tukang / Mandor 0.0022 O.H 127,300.00
Tukang 0.0434 O.H 127,300.00
Pembantu Tukang 0.0434 O.H 127,300.00
Jumlah:
Bahan:
Slimar Alumunium 3/8 1.1000 m1 110,000.00
Skrup 4 inchi / Ripet 2.0000 Buah 550.00
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Sealent 0.0600 tube 15,000.00
Jumlah:
Nilai HSPK :
Pemasangan Pintu PJ1 (Pintu Kelas) unit
Bagian Pintu :
Kusen Alumunium 4" Powder Coating Putih 7.2400 m1 101,870.85
Slimar Alumunium 3/8 Powder Coating Putih 2.8800 m1 134,884.97
Kaca Polos Tebal 5 mm 0.2550 m2 100,915.84
Handle Pintu 1.0000 bh 262,561.00
Engsel Pintu 1.5000 psg 58,015.84
Engsel Jendela Casement 1.0000 psg Err:509
Daun Pintu SWP 92 x 210 cm 1.0000 unit Err:509
Finishing melamin Duco 3.8640 m2 Err:509
Bagian Jendela :
Kusen Alumunium 4" Powder Coating Putih 10.2000 m1 101,870.85
Slimar Alumunium 3/8 Powder Coating Putih 9.0000 m1 134,884.97
Kaca Polos Tebal 5 mm 1.4616 m2 100,915.84
Engsel Jendela Casement 3.0000 psg Err:509
Grendel Jendela 3.0000 bh Err:509
Jumlah:
Nilai HSPK :
Pemasangan Pintu P1 (Pintu Aula) unit
Kusen Alumunium 4" Powder Coating Putih 8.8000 m1 101,870.85
Slimar Alumunium 3/8 Powder Coating Putih 4.8000 m1 134,884.97
Kaca Polos Tebal 5 mm 0.4674 m2 100,915.84
Pull Handle + Body Kunci + Kunci Silinder 1.0000 psg Err:509
Grendel Tanam Pintu Dobel 1.0000 psg Err:509
Engsel Pintu 4.0000 psg 58,015.84
Engsel Jendela Casement 2.0000 psg Err:509
Daun Pintu SWP 72 x 210 cm 2.0000 unit Err:509
Finishing melamin Duco 3.0240 m2 Err:509
Jumlah:
Nilai HSPK :
Pemasangan Pintu P2 (Pintu Rg. Ganti) unit
Kusen Alumunium 4" Powder Coating Putih 7.2800 m1 101,870.85
Slimar Alumunium 3/8 Powder Coating Putih 2.8400 m1 134,884.97
Kaca Polos Tebal 5 mm 0.3239 m2 100,915.84
Handle Pintu 1.0000 bh 262,561.00
Engsel Pintu 1.5000 psg 58,015.84
Engsel Jendela Casement 1.0000 psg Err:509
Daun Pintu SWP 92 x 210 cm 1.0000 unit Err:509
Finishing melamin Duco 3.0240 m2 Err:509
Jumlah:
Nilai HSPK :
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Pemasangan Pintu P3 (Pintu KM) unit
Kusen Alumunium 4" Powder Coating Putih 5.0600 m1 101,870.85
Slimar Alumunium 3/8 Powder Coating Putih 6.3000 m1 134,884.97
Spandrill Alumunium 10 cm 1.4700 m2 250,000.00
Err:509 1.0000 bh Err:509
Engsel Pintu 1.5000 psg 58,015.84
Jumlah:
Nilai HSPK :
Pemasangan Jendela J1 unit
Kusen Alumunium 4" Powder Coating Putih 11.5000 m1 101,870.85
Slimar Alumunium 3/8 Powder Coating Putih 9.0000 m1 134,884.97
Kaca Polos Tebal 5 mm 1.4616 m2 100,915.84
Engsel Jendela Casement 3.0000 psg Err:509
Grendel Jendela 3.0000 bh Err:509
Jumlah:
Nilai HSPK :
Pemasangan Jendela J2 unit
Kusen Alumunium 4" Powder Coating Putih 12.2400 m1 101,870.85
Slimar Alumunium 3/8 Powder Coating Putih 11.4400 m1 134,884.97
Kaca Polos Tebal 5 mm 2.6816 m2 100,915.84
Engsel Jendela Casement 4.0000 psg Err:509
Grendel Jendela 4.0000 bh Err:509
Jumlah:
Nilai HSPK :
Pemasangan Jendela BV1 unit
Kusen Alumunium 4" Powder Coating Putih 2.6000 m1 101,870.85
Slimar Alumunium 3/8 Powder Coating Putih 2.4400 m1 134,884.97
Kaca Polos Tebal 5 mm 0.2419 m2 100,915.84
Engsel Jendela Casement 1.0000 psg Err:509
Grendel Jendela 1.0000 bh Err:509
Jumlah:
Nilai HSPK :
Pemasangan Jendela BV2 unit
Kusen Alumunium 4" Powder Coating Putih 6.6000 m1 101,870.85
Slimar Alumunium 3/8 Powder Coating Putih 4.8800 m1 134,884.97
Kaca Polos Tebal 5 mm 0.8726 m2 100,915.84
Engsel Jendela Casement 2.0000 psg Err:509
Grendel Jendela 2.0000 bh Err:509
Jumlah:
Nilai HSPK :
Pemasangan Kaca Polos tebal 5 mm m2
Upah:
Kepala Tukang / Mandor 0.0008 O.H 127,300.00
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Kepala Tukang / Mandor 0.0150 O.H 127,300.00
Tukang 0.1500 O.H 127,300.00
Pembantu Tukang 0.0150 O.H 127,300.00
Jumlah:
Bahan:
Kaca Polos Tebal 5 mm 1.1000 m2 70,000.00
Sealent 0.0600 tube 15,000.00
Jumlah:
Nilai HSPK :
Pemasangan Kaca Es tebal 5 mm m2
Upah:
Kepala Tukang / Mandor 0.0008 O.H 127,300.00
Kepala Tukang / Mandor 0.0150 O.H 127,300.00
Tukang 0.1500 O.H 127,300.00
Pembantu Tukang 0.0150 O.H 127,300.00
Jumlah:
Bahan:
Kaca Es 5 mm 1.1000 m2 Err:509
Sealent 0.0600 tube 15,000.00
Jumlah:
Nilai HSPK :
Pasang Handle Set LHTR 0039 SSS + MTS IL DL
Buah
8485 SSS + CYL DC DL 60 MM SN
Upah:
Kepala Tukang / Mandor 0.0500 O.H 127,300.00
Kepala Tukang / Mandor 0.0100 O.H 127,300.00
Tukang 0.5000 O.H 127,300.00
Pembantu Tukang 0.0100 O.H 127,300.00
Jumlah:
Bahan:
1.0000 Buah 190,000.00
Handle Pintu
Jumlah:
Nilai HSPK :
Pull Handle PH DKS DL1831 + Body Kunci +
Buah
Kunci Silinder
Upah:
Kepala Tukang / Mandor 0.0500 O.H 127,300.00
Kepala Tukang / Mandor 0.0100 O.H 127,300.00
Tukang 0.5000 O.H 127,300.00
Pembantu Tukang 0.0100 O.H 127,300.00
Jumlah:
Bahan:
Err:509 2.0000 Pasang Err:509
Err:509 1.0000 Buah Err:509
Kunci Pintu + Ring Kunci 1.0000 Buah 60,000.00
Jumlah:
Nilai HSPK :
Kunci Pintu KM C604x400 Bulat Buah
Upah:
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Kepala Tukang / Mandor 0.0500 O.H 127,300.00
Kepala Tukang / Mandor 0.0100 O.H 127,300.00
Tukang 0.5000 O.H 127,300.00
Pembantu Tukang 0.0100 O.H 127,300.00
Jumlah:
Bahan:
Err:509 1.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Pemasangan Engsel Untuk Jendela Stel
Upah:
Kepala Tukang / Mandor 0.0005 O.H 127,300.00
Kepala Tukang / Mandor 0.0100 O.H 127,300.00
Tukang 0.1000 O.H 127,300.00
Pembantu Tukang 0.0100 O.H 127,300.00
Jumlah:
Bahan:
Engsel Jendela Casement 1.0000 stel Err:509
Jumlah:
Nilai HSPK :
Pemasangan Engsel Chasment Untuk Jendela Stel
Upah:
Kepala Tukang / Mandor 0.0005 O.H 127,300.00
Kepala Tukang / Mandor 0.0100 O.H 127,300.00
Tukang 0.1000 O.H 127,300.00
Pembantu Tukang 0.0100 O.H 127,300.00
Jumlah:
Bahan:
Engsel Chasment 1.0000 stel 40,000.00
Jumlah:
Nilai HSPK :
Pemasangan Engsel Untuk Pintu Stel
Upah:
Kepala Tukang / Mandor 0.0008 O.H 127,300.00
Kepala Tukang / Mandor 0.0150 O.H 127,300.00
Tukang 0.1500 O.H 127,300.00
Pembantu Tukang 0.0150 O.H 127,300.00
Jumlah:
Bahan:
Engsel (untuk Pintu) 1.0000 stel 35,000.00
Jumlah:
Nilai HSPK :
Pemasangan Grendel Buah
Upah:
Tukang 0.1200 O.H 127,300.00
Pembantu Tukang 0.0600 O.H 127,300.00
Jumlah:
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Bahan:
Grendel Panjang 1.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Pemasangan Grendel Biasa (Jendela) Buah
Upah:
Tukang 0.1200 O.H 127,300.00
Pembantu Tukang 0.0600 O.H 127,300.00
Jumlah:
Bahan:
Grendel Biasa (kecil) 1.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Pemasangan Grendel Biasa (Besar) Buah
Upah:
Tukang 0.1200 O.H 127,300.00
Pembantu Tukang 0.0600 O.H 127,300.00
Jumlah:
Bahan:
Grendel Biasa (besar) 1.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Pemasangan Grendel Tanam Buah
Upah:
Tukang 0.1400 O.H 127,300.00
Pembantu Tukang 0.0800 O.H 127,300.00
Jumlah:
Bahan:
Grendel Tanam 1.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Pemasangan Grendel Kuningan/ Croum (Kecil) Buah
Upah:
Tukang Kayu 0.1200 O.H 127,300.00
Pembantu Tukang 0.0600 O.H 127,300.00
Jumlah:
Bahan:
Grendel Tanam 1.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Upah:
Tukang 0.1200 O.H 127,300.00
Pembantu Tukang 0.0600 O.H 127,300.00
Jumlah:
Bahan:
Hak Angin kuningan Lurus Maju/Mundur 1.0000 Buah Err:509
Jumlah:
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Nilai HSPK :
Pemasangan Hak Angin 4 mm (Lurus) Stel
Upah:
Tukang 0.1400 O.H 127,300.00
Pembantu Tukang 0.0800 O.H 127,300.00
Jumlah:
Bahan:
Hak Angin 4 mm (lurus biasa) 1.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Pemasangan Terali Besi m2
Upah:
Kepala Tukang / Mandor 0.0830 O.H 127,300.00
Kepala Tukang / Mandor 0.1670 O.H 127,300.00
Tukang Besi 0.1670 O.H 127,300.00
Pembantu Tukang 0.1474 O.H 127,300.00
Jumlah:
Bahan:
Besi Virkan 15.4000 kg 8,800.00
Electrode Baja (20%) 0.2000 Kg 15,000.00
Jumlah:
Nilai HSPK :
Pemasangan Sun Scren Alumunium (SS-A) UNIT
Upah:
Kepala Tukang / Mandor 0.0132 O.H 127,300.00
Kepala Tukang / Mandor 0.0258 O.H 127,300.00
Tukang 0.2580 O.H 127,300.00
Pembantu Tukang 0.2580 O.H 127,300.00
Jumlah:
Bahan:
Aluminium Powder Coating Putih Uk. 4 x 10, Profil 4" 11.1500 m1 Err:509
Louver Alumunium 25.9000 m1 350,000.00
Skrup/Ripet 132.0000 bh 550.00
DynaBolth 8mm 8.0000 bh Err:509
Jumlah:
Nilai HSPK :
Pemasangan Sun Scren Alumunium (SS-B) UNIT
Upah:
Kepala Tukang / Mandor 0.0132 O.H 127,300.00
Kepala Tukang / Mandor 0.0258 O.H 127,300.00
Tukang 0.2580 O.H 127,300.00
Pembantu Tukang 0.2580 O.H 127,300.00
Jumlah:
Bahan:
Aluminium Powder Coating Putih Uk. 4 x 10, Profil 4" 16.9000 m1 Err:509
Louver Alumunium 38.1500 m1 350,000.00
Skrup/Ripet 200.0000 bh 550.00
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
DynaBolth 8mm 10.0000 bh Err:509
Jumlah:
Nilai HSPK :
Pemasangan Sun Scren Alumunium (SS-C) UNIT
Upah:
Kepala Tukang / Mandor 0.0132 O.H 127,300.00
Kepala Tukang / Mandor 0.0258 O.H 127,300.00
Tukang 0.2580 O.H 127,300.00
Pembantu Tukang 0.2580 O.H 127,300.00
Jumlah:
Bahan:
Aluminium Powder Coating Putih Uk. 4 x 10, Profil 4" 4.6500 m1 Err:509
Louver Alumunium 8.4000 m1 350,000.00
Skrup/Ripet 68.0000 bh 550.00
DynaBolth 8mm 4.0000 bh Err:509
Jumlah:
Nilai HSPK :
Pemasangan Sun Scren Alumunium (SS-D) UNIT
Upah:
Kepala Tukang / Mandor 0.0132 O.H 127,300.00
Kepala Tukang / Mandor 0.0258 O.H 127,300.00
Tukang 0.2580 O.H 127,300.00
Pembantu Tukang 0.2580 O.H 127,300.00
Jumlah:
Bahan:
Aluminium Powder Coating Putih Uk. 4 x 10, Profil 4" 9.1000 m1 Err:509
Louver Alumunium 21.3500 m1 350,000.00
Skrup/Ripet 100.0000 bh 550.00
DynaBolth 8mm 7.0000 bh Err:509
Jumlah:
Nilai HSPK :
Pemasangan Hand Railing Pipa Stainlees Steel
m'
Dia 2"
Upah:
Kepala Tukang / Mandor 0.0176 O.H 127,300.00
Kepala Tukang / Mandor 0.0344 O.H 127,300.00
Tukang 0.3440 O.H 127,300.00
Pembantu Tukang 0.3440 O.H 127,300.00
Jumlah:
Bahan:
Pipa Stainlees Steel Ø2" 1.1000 m1 186,666.67
Perlengkapan 25% 0.2500 buah 28,000.00
Electrode Baja (20%) 0.2000 Kg 15,000.00
Jumlah:
Nilai HSPK :
Instalasi Listrik
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Pemasangan Titik Stop Kontak Gedung Titik
Upah:
Kepala Tukang / Mandor 0.0504 O.H 127,300.00
Tukang 0.2018 O.H 127,300.00
Pembantu Tukang 0.0010 O.H 127,300.00
Jumlah:
Bahan
Stop Kontak 1.0000 Buah 8,000.00
Kabel NYM 500 Volt 3 x 2,5 mm2 10.0000 m1 6,000.00
Pipa Pralon 5/8 2.5000 Lonjor Err:509
T Doos Pvc 1.0000 Buah 1,000.00
Jumlah:
Nilai HSPK :
Pemasangan Titik Stop Kontak AC Gedung Titik
Upah:
Kepala Tukang / Mandor 0.0504 O.H 127,300.00
Tukang 0.2018 O.H 127,300.00
Pembantu Tukang 0.0010 O.H 127,300.00
Jumlah:
Bahan
Stop Kontak AC 1.0000 Buah 12,000.00
Kabel NYM 500 Volt 3 x 2,5 mm2 10.0000 m1 6,000.00
Pipa Pralon 5/8 2.5000 Lonjor Err:509
T Doos Pvc 1.0000 Buah 1,000.00
Jumlah:
Nilai HSPK :
Pemasangan Titik Lampu Gedung Fitting Plafond Titik
Upah:
Kepala Tukang / Mandor 0.0504 O.H 127,300.00
Tukang 0.5045 O.H 127,300.00
Pembantu Tukang 0.3029 O.H 127,300.00
Jumlah:
Bahan
Isolator 4.0000 Buah 1,000.00
Kabel NYM 500 Volt 3 x 2,5 mm2 10.0000 m1 6,000.00
Pipa Pralon 5/8 2.5000 Lonjor Err:509
T Doos Pvc 1.0000 Buah 1,000.00
Fitting Plafod Bulat 1.0000 Buah 8,000.00
Jumlah:
Nilai HSPK :
Pemasangan Titik Lampu Gedung Fitting
Titik
Downlight 4"
Upah:
Kepala Tukang / Mandor 0.0504 O.H 127,300.00
Tukang 0.5045 O.H 127,300.00
Pembantu Tukang 0.3029 O.H 127,300.00
Jumlah:
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Bahan
Isolator 4.0000 Buah 1,000.00
Kabel NYM 500 Volt 3 x 2,5 mm2 10.0000 m1 6,000.00
Pipa Pralon 5/8 2.5000 Lonjor Err:509
T Doos Pvc 1.0000 Buah 1,000.00
Fitting Downlight 4" 1.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Pemasangan Titik Lampu Gedung Fitting
Titik
Downlight 6"
Upah:
Kepala Tukang / Mandor 0.0504 O.H 127,300.00
Tukang 0.5045 O.H 127,300.00
Pembantu Tukang 0.3029 O.H 127,300.00
Jumlah:
Bahan
Isolator 4.0000 Buah 1,000.00
Kabel NYM 500 Volt 3 x 2,5 mm2 10.0000 m1 6,000.00
Pipa Pralon 5/8 2.5000 Lonjor Err:509
T Doos Pvc 1.0000 Buah 1,000.00
Fitting Downlight 6" 1.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Pemasangan Saklar Tunggal Titik
Upah:
Kepala Tukang / Mandor 0.0504 O.H 127,300.00
Tukang 0.2018 O.H 127,300.00
Pembantu Tukang 0.0010 O.H 127,300.00
Jumlah:
Bahan
Saklar Tunggal 1.0000 Buah 10,000.00
Jumlah:
Nilai HSPK :
Pemasangan Saklar Ganda Titik
Upah:
Kepala Tukang / Mandor 0.0504 O.H 127,300.00
Tukang 0.2018 O.H 127,300.00
Pembantu Tukang 0.0010 O.H 127,300.00
Jumlah:
Bahan
Saklar Ganda 1.0000 Buah 10,000.00
Jumlah:
Nilai HSPK :
Pemasangan Lampu LED 7 W Titik
Upah:
Tukang 0.1000 O.H 127,300.00
Pembantu Tukang 0.0010 O.H 127,300.00
Jumlah:
Bahan
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Lampu LED 7 W 1.0000 Buah 32,000.00
Jumlah:
Nilai HSPK :
Pemasangan Lampu LED 14 W Titik
Upah:
Tukang 0.1000 O.H 127,300.00
Pembantu Tukang 0.0010 O.H 127,300.00
Jumlah:
Bahan
Lampu LED 14 W 1.0000 Buah 45,000.00
Jumlah:
Nilai HSPK :
Pemasangan Lampu LED 40 W Titik
Upah:
Tukang 0.1000 O.H 127,300.00
Pembantu Tukang 0.0010 O.H 127,300.00
Jumlah:
Bahan
Lampu LED 40 W 1.0000 Buah 20,000.00
Jumlah:
Nilai HSPK :
Pemasanga Grounding Titik
Upah:
Kepala Tukang / Mandor 0.2000 O.H 127,300.00
Tukang 0.5000 O.H 127,300.00
Pembantu Tukang 0.5000 O.H 127,300.00
Jumlah:
Bahan
Grounding 1.0000 Buah Err:509
Jumlah:
Nilai HSPK :
Penarikan kabel BC 50 mm2 m'
Upah:
Kepala Tukang / Mandor 0.0500 O.H 127,300.00
Tukang 0.1000 O.H 127,300.00
Pembantu Tukang 0.2500 O.H 127,300.00
Jumlah:
Bahan
Kabel BC 50 mm2 1.0500 m Err:509
Pipa PVC AW dia 3/4" 0.2860 m 15,000.00
Klem 2.0000 bh Err:509
Jumlah:
Nilai HSPK :
Head Penangkal Petir bh
Upah:
Kepala Tukang / Mandor 0.2000 O.H 127,300.00
Kepala Tukang / Mandor 0.5000 O.H 127,300.00
Tukang Listrik 0.5000 O.H 127,300.00
Pembantu Tukang 2.0000 O.H 127,300.00
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Jumlah:
Bahan
Head Penangkal Petir 1.1500 m Err:509
Jumlah:
Nilai HSPK :
Pembuatan Bak Kontrol (penangkal petir) Buah
Upah:
Galian Tanah Cadas/rabat 0.2100 m3 Err:509
Box 0.0770 m3 Err:509
Jumlah:
Bahan:
Besi Siku 11.2860 Kg Err:509
Besi Strip 21.8880 Kg Err:509
Engsel 2.0000 Buah Err:509
Elektroda Baja 0.2000 Kg 15,000.00
Jumlah:
Nilai HSPK :
Pasang Penangkal Petir bh
Upah:
Kepala Tukang / Mandor 0.0152 OH 127,300.00
Pembantu Tukang 0.0304 OH 127,300.00
Jumlah:
Bahan:
Buis Beton Setengah Lingkaran ∅ 30 cm 1.0000 bh Err:509
Semen PC (Portland Cement) 40 kg 0.0500 Zak 58,000.00
Jumlah:
Nilai HSPK :
Pembuatan Tutup Gril Saluran m2
Bahan:
HARGA
NOMOR URAIAN KEGIATAN KOEF. SATUAN
SATUAN
Besi Siku 6.0000 Kg Err:509
Besi Ø 12 mm 22.2925 Kg Err:509
Elektroda Baja 0.2000 Kg 15,000.00
Jumlah:
Nilai HSPK :
Pemasangan Pompa Jet wasser PC500EA m2
Upah:
Tukang 0.4500 O.H 127,300.00
Pembantu Tukang 0.1200 O.H 127,300.00
Jumlah:
Bahan:
Jet washer PC500EA 1.0000 Buah Err:509
Perlengkapan 10% harga wastafel 0.1200 Buah Err:509
Jumlah:
Nilai HSPK :
Pembuatan Rumah Pompa m2
HARGA
1,283.39
577.53
12,843.92
12,852.56
27,557.40
Err:509
13,200.00
550.00
Err:509
Err:509
SNI 2835:2008 (6.1)
3,208.48
96,394.19
99,602.67
Err:509
Err:509
Err:509
50,920.00
509,200.00
560,120.00
560,120.00
SNI 03-2835-2002 pek.tanah bangunan
sederhana (6.8)
6,416.96
64,262.80
70,679.76
70,679.76
SNI 2835:2008 (6.11)
1,283.39
38,557.68
39,841.07
HARGA
72,000.00
72,000.00
111,841.07
SNI 2835:2008 (6.15)
3,208.48
32,131.40
35,339.88
Err:509
Err:509
Err:509
Err:509
Err:509
32,131.40
32,131.40
16,250.00
16,250.00
48,381.40
SNI 2835:2008 (6.8)
1,283.39
42,413.44
43,696.84
43,696.84
2,695.12
32,131.40
34,826.52
Err:509
Err:509
5,720.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
HARGA
318.25
5,142.92
6,428.65
11,889.82
Err:509
Err:509
Err:509
SNI 2836:2008 (6.2)
9,623.88
9,623.88
96,327.91
192,783.12
308,358.79
189,080.00
52,000.00
Err:509
Err:509
Err:509
9,241.98
185,081.47
194,323.45
Err:509
Err:509
Err:509
Err:509
3,207.96
10,273.11
32,105.06
212,069.07
257,655.20
415,297.40
53,702.00
Err:509
HARGA
1,528,616.00
Err:509
Err:509
SNI 7394:2008 (6.5)
3,593.50
35,320.77
212,067.22
250,981.50
342,300.00
52,868.75
73,113.15
2,150.00
470,431.90
721,413.40
SNI 7394:2008 (6.7)
3,593.50
35,320.77
212,067.22
250,981.50
389,550.00
47,987.50
74,392.10
2,150.00
514,079.60
765,061.10
SNI 7394:2008 (6.8)
3,593.50
35,320.77
212,067.22
250,981.50
403,200.00
47,575.00
73,823.68
2,150.00
526,748.68
777,730.18
SNI 7394:2008 (6.10)
3,593.50
35,320.77
212,067.22
250,981.50
433,650.00
HARGA
46,818.75
72,544.73
2,150.00
555,163.48
806,144.98
SNI 7394:2008 (6.17)
3,593.50
35,320.77
212,067.22
250,981.50
389,550.00
47,987.50
74,392.10
2,150.00
514,079.60
765,061.10
SNI 7394:2008 (6.17)
89.84
899.07
899.68
1,888.58
9,240.00
630.00
9,870.00
11,758.58
SNI 7394:2008 (6.21)
4,235.19
42,384.93
84,826.89
131,447.01
19,800.00
Err:509
3,300.00
660.00
Err:509
Err:509
SNI 7394:2008 (6.22)
4,235.19
42,384.93
84,826.89
HARGA
131,447.01
16,500.00
63,000.00
4,400.00
1,320.00
Err:509
Err:509
Err:509
SNI 7394:2008 (6.22)
4,235.19
42,384.93
84,826.89
131,447.01
19,800.00
63,000.00
4,400.00
1,320.00
Err:509
Err:509
Err:509
SNI 7394:2008 (6.24)
4,235.19
42,384.93
84,826.89
131,447.01
16,500.00
63,000.00
4,400.00
1,320.00
Err:509
Err:509
Err:509
SNI 03-2835-2002 pek.persiapan dan pek.tanah
bangunan sederhana (6.8)
3,182.50
6,365.00
9,547.50
9,547.50
HARGA
765,061.10
1,458,064.49
2,223,125.59
777,730.18
1,693,236.18
Err:509
47,737.50
Err:509
777,730.18
1,704,994.77
Err:509
38,190.00
Err:509
777,730.18
2,445,785.60
Err:509
19,095.00
Err:509
777,730.18
1,646,201.85
Err:509
95,475.00
Err:509
765,061.10
2,845,577.48
Err:509
127,300.00
HARGA
Err:509
777,730.18
1,669,719.01
Err:509
76,380.00
Err:509
777,730.18
1,587,408.92
Err:509
159,125.00
Err:509
777,730.18
1,975,442.21
Err:509
127,300.00
Err:509
777,730.18
2,328,199.75
Err:509
111,387.50
Err:509
765,061.10
2,916,128.98
Err:509
159,125.00
Err:509
765,061.10
HARGA
1,846,097.78
Err:509
159,125.00
Err:509
765,061.10
2,916,128.98
Err:509
159,125.00
Err:509
765,061.10
2,492,819.94
Err:509
159,125.00
Err:509
765,061.10
3,151,300.68
Err:509
159,125.00
Err:509
777,730.18
2,140,062.40
Err:509
159,125.00
Err:509
777,730.18
2,057,752.31
Err:509
127,300.00
Err:509
HARGA
777,730.18
1,375,754.40
Err:509
95,475.00
Err:509
777,730.18
1,963,683.63
Err:509
95,475.00
Err:509
777,730.18
2,222,372.49
Err:509
159,125.00
Err:509
777,730.18
2,128,303.81
Err:509
127,300.00
Err:509
765,061.10
2,998,439.08
Err:509
190,950.00
Err:509
765,061.10
1,810,822.03
HARGA
Err:509
197,315.00
Err:509
777,730.18
1,540,374.58
Err:509
79,562.50
Err:509
777,730.18
1,152,341.29
Err:509
79,562.50
Err:509
777,730.18
1,281,685.72
Err:509
95,475.00
Err:509
765,061.10
870,135.26
Err:509
95,475.00
Err:509
765,061.10
1,022,996.86
Err:509
119,343.75
Err:509
HARGA
765,061.10
1,316,961.48
Err:509
159,125.00
Err:509
SNI 6897:2008 (6.8)
1,283.18
12,843.30
38,557.90
52,684.38
16,669.20
4,000.00
39,200.00
59,869.20
112,553.58
SNI 6897:2008 (6.9)
1,283.18
12,843.30
38,557.90
52,684.38
13,340.00
4,300.00
39,200.00
56,840.00
109,524.38
4,235.27
42,384.54
127,240.17
173,859.98
72,800.00
72,800.00
246,659.98
SNI 2837:2008 (6.3)
1,924.78
19,265.58
38,557.90
59,748.26
HARGA
9,020.16
2,300.00
11,320.16
71,068.42
SNI 2837:2008 (6.4)
1,924.78
19,265.58
38,557.90
59,748.26
7,238.40
2,400.00
9,638.40
69,386.66
SNI 2837:2008 (6.20)
5,134.01
5,137.83
10,282.02
20,553.86
580.00
1,300.00
1,880.00
22,433.86
SNI DT 2837:2008 (6.27)
1,283.18
12,843.30
25,705.69
39,832.17
3,770.00
3,770.00
43,602.17
1,909.50
12,730.00
38,190.00
52,829.50
15,088.50
1,500.00
Err:509
HARGA
Err:509
Err:509
1,909.50
12,730.00
38,190.00
52,829.50
15,088.50
Err:509
Err:509
Err:509
384.45
3,853.37
2,570.19
6,808.00
1,250.00
1,500.00
2,750.00
9,558.00
SNI 2002 Pekerjaan Pengecatan (6.15)
808.36
8,091.19
2,570.19
11,469.73
1,250.00
300.00
10,400.00
11,950.00
23,419.73
SNI 2002 Pekerjaan Pengecatan (6.15)
808.36
8,091.19
2,570.19
11,469.73
300.00
1,440.00
11,960.00
13,700.00
25,169.73
HARGA
1,154.61
11,560.11
9,639.16
22,353.88
4,900.00
Err:509
3,000.00
3,000.00
27,500.00
7,500.00
18,079.20
460.00
Err:509
Err:509
1,250.00
Err:509
Err:509
962.39
9,632.79
6,426.10
17,021.28
10,500.00
1,500.00
12,000.00
29,021.28
SNI 2002 Pekerjaan Pengecatan (6.9)
513.02
13,486.16
8,996.29
22,995.47
Err:509
900.00
4,250.00
7,500.00
Err:509
Err:509
Err:509
4,491.91
4,491.91
44,953.70
89,967.87
143,905.39
11,368.00
7,800.00
4,500.00
42,432.00
66,100.00
210,005.39
4,491.91
4,491.91
44,953.70
89,967.87
143,905.39
10,290.00
7,800.00
4,500.00
Err:509
Err:509
Err:509
5,728.50
5,728.50
57,285.00
114,570.00
183,312.00
9,765.00
11,640.00
1,800.00
47,250.00
70,455.00
253,767.00
5,728.50
5,728.50
57,285.00
114,570.00
183,312.00
9,765.00
11,640.00
1,800.00
Err:509
Err:509
Err:509
SNI DT 91-0012-2007 (6.48)
636.50
1,145.70
11,457.00
11,457.00
24,696.20
1,197.00
187.50
300.00
15,900.00
17,584.50
42,280.70
SNI 7395:2008 (6.35)
4,491.91
4,491.91
44,953.70
89,967.87
143,905.39
11,600.00
3,000.00
4,500.00
39,900.00
59,000.00
202,905.39
SNI DT 91-0012-2007 (6.54)
5,728.50
5,728.50
57,285.00
114,570.00
183,312.00
HARGA
7,812.00
11,640.00
1,800.00
Err:509
Err:509
Err:509
Err:509
SNI DT 91-0012-2007 (6.54)
5,728.50
5,728.50
57,285.00
114,570.00
183,312.00
7,812.00
11,640.00
1,800.00
Err:509
Err:509
Err:509
Err:509
SNI 7395:2008 (6.39)
1,154.99
641.72
11,559.48
11,567.24
24,923.43
1,322.40
150.00
300.00
Err:509
Err:509
Err:509
SNI 7393:2008 (6.2)
385.02
770.04
7,706.35
7,711.54
16,572.94
4,600.00
Err:509
750.00
HARGA
Err:509
Err:509
381.90
763.80
7,638.00
381.90
9,165.60
6,600.00
Err:509
750.00
Err:509
Err:509
381.90
763.80
7,638.00
381.90
9,165.60
Err:509
Err:509
750.00
Err:509
Err:509
381.90
763.80
7,638.00
381.90
9,165.60
Err:509
Err:509
750.00
Err:509
Err:509
381.90
763.80
7,638.00
HARGA
381.90
9,165.60
14,365.67
Err:509
750.00
Err:509
Err:509
636.50
1,273.00
12,730.00
25,460.00
40,099.50
11,550.00
12,750.00
4,000.00
28,300.00
68,399.50
1,782.20
980.21
2,036.80
4,799.21
Err:509
7,040.00
1,500.00
Err:509
10.50
10.50
Err:509
1,782.20
980.21
2,036.80
4,799.21
Err:509
13,933.04
Err:509
1,500.00
Err:509
105.00
HARGA
105.00
Err:509
33,416.25
33,416.25
66,832.50
Err:509
Err:509
Err:509
Err:509
89,110.00
89,110.00
178,220.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
SNI 2002 Pekerjaan Penutup Atap (6.1)
1,026.71
1,026.71
9,632.94
19,278.84
30,965.20
87,500.00
87,500.00
118,465.20
1,018.40
1,018.40
9,547.50
19,095.00
30,679.30
Err:509
Err:509
HARGA
Err:509
Err:509
1,018.40
1,018.40
9,547.50
19,095.00
30,679.30
Err:509
Err:509
Err:509
Err:509
SNI 2002 Pekerjaan Penutup Atap (6.5)
2,566.78
256.68
25,687.83
51,410.24
79,921.53
9,280.00
3,230.00
28,000.00
40,510.00
120,431.53
954.75
572.85
5,728.50
1,909.50
9,165.60
10,000.00
750.00
10,750.00
19,915.60
9,547.50
3,182.50
31,825.00
19,095.00
63,650.00
HARGA
12,000.00
8,000.00
16,039.80
1,350.00
37,389.80
101,039.80
9,547.50
3,182.50
31,825.00
19,095.00
63,650.00
12,000.00
8,000.00
Err:509
1,350.00
Err:509
Err:509
254.60
2,546.00
25,460.00
50,920.00
79,180.60
120,400.00
Err:509
Err:509
Err:509
487,983.33
91,496.88
579,480.21
Err:509
15,000.00
Err:509
3,750.00
3,750.00
Err:509
HARGA
487,983.33
91,496.88
579,480.21
Err:509
15,000.00
Err:509
3,750.00
3,750.00
Err:509
3,182.50
3,182.50
25,460.00
12,730.00
44,555.00
Err:509
2,200.00
Err:509
Err:509
551.86
269.51
5,522.89
5,526.60
11,870.85
88,000.00
1,100.00
900.00
90,000.00
101,870.85
551.86
283.62
5,522.89
5,526.60
11,884.97
121,000.00
1,100.00
HARGA
900.00
123,000.00
134,884.97
737,544.97
388,468.71
25,733.54
262,561.00
87,023.76
Err:509
Err:509
Err:509
1,039,082.69
1,213,964.73
147,498.59
Err:509
Err:509
Err:509
Err:509
896,463.50
647,447.86
47,168.06
Err:509
Err:509
232,063.36
Err:509
Err:509
Err:509
Err:509
Err:509
741,619.80
383,073.31
32,686.64
262,561.00
87,023.76
Err:509
Err:509
Err:509
Err:509
Err:509
HARGA
515,466.51
849,775.31
367,500.00
Err:509
87,023.76
Err:509
Err:509
1,171,514.80
1,213,964.73
147,498.59
Err:509
Err:509
Err:509
Err:509
1,246,899.23
1,543,084.06
270,615.92
Err:509
Err:509
Err:509
Err:509
264,864.22
329,119.33
24,411.54
Err:509
Err:509
Err:509
Err:509
672,347.63
658,238.65
88,059.16
Err:509
Err:509
Err:509
Err:509
101.84
HARGA
1,909.50
19,095.00
1,909.50
23,015.84
77,000.00
900.00
77,900.00
100,915.84
101.84
1,909.50
19,095.00
1,909.50
23,015.84
Err:509
900.00
Err:509
Err:509
6,365.00
1,273.00
63,650.00
1,273.00
72,561.00
190,000.00
190,000.00
262,561.00
6,365.00
1,273.00
63,650.00
1,273.00
72,561.00
Err:509
Err:509
60,000.00
Err:509
Err:509
HARGA
6,365.00
1,273.00
63,650.00
1,273.00
72,561.00
Err:509
Err:509
Err:509
63.65
1,273.00
12,730.00
1,273.00
15,339.65
Err:509
Err:509
Err:509
63.65
1,273.00
12,730.00
1,273.00
15,339.65
40,000.00
40,000.00
55,339.65
101.84
1,909.50
19,095.00
1,909.50
23,015.84
35,000.00
35,000.00
58,015.84
15,276.00
7,638.00
22,914.00
HARGA
Err:509
Err:509
Err:509
15,276.00
7,638.00
22,914.00
Err:509
Err:509
Err:509
15,276.00
7,638.00
22,914.00
Err:509
Err:509
Err:509
17,822.00
10,184.00
28,006.00
Err:509
Err:509
Err:509
15,276.00
7,638.00
22,914.00
Err:509
Err:509
Err:509
15,276.00
7,638.00
22,914.00
Err:509
Err:509
HARGA
Err:509
17,822.00
10,184.00
28,006.00
Err:509
Err:509
Err:509
10,565.90
21,259.10
21,259.10
18,757.66
71,841.76
135,520.00
3,000.00
138,520.00
210,361.76
1,680.36
3,284.34
32,843.40
32,843.40
70,651.50
Err:509
9,065,000.00
72,600.00
Err:509
Err:509
Err:509
1,680.36
3,284.34
32,843.40
32,843.40
70,651.50
Err:509
13,352,500.00
110,000.00
HARGA
Err:509
Err:509
Err:509
1,680.36
3,284.34
32,843.40
32,843.40
70,651.50
Err:509
2,940,000.00
37,400.00
Err:509
Err:509
Err:509
1,680.36
3,284.34
32,843.40
32,843.40
70,651.50
Err:509
7,472,500.00
55,000.00
Err:509
Err:509
Err:509
2,240.48
4,379.12
43,791.20
43,791.20
94,202.00
205,333.33
7,000.00
3,000.00
215,333.33
309,535.33
HARGA
6,416.96
25,687.83
128.52
32,233.31
8,000.00
60,000.00
Err:509
1,000.00
Err:509
Err:509
6,416.96
25,687.83
128.52
32,233.31
12,000.00
60,000.00
Err:509
1,000.00
Err:509
Err:509
6,416.96
64,219.59
38,557.68
109,194.24
4,000.00
60,000.00
Err:509
1,000.00
8,000.00
Err:509
Err:509
6,416.96
64,219.59
38,557.68
109,194.24
HARGA
4,000.00
60,000.00
Err:509
1,000.00
Err:509
Err:509
Err:509
6,416.96
64,219.59
38,557.68
109,194.24
4,000.00
60,000.00
Err:509
1,000.00
Err:509
Err:509
Err:509
6,416.96
25,687.83
128.52
32,233.31
10,000.00
10,000.00
42,233.31
6,416.96
25,687.83
128.52
32,233.31
10,000.00
10,000.00
42,233.31
12,730.00
127.30
12,857.30
HARGA
32,000.00
32,000.00
44,857.30
12,730.00
127.30
12,857.30
45,000.00
45,000.00
57,857.30
12,730.00
127.30
12,857.30
20,000.00
20,000.00
32,857.30
25,460.00
63,650.00
63,650.00
152,760.00
Err:509
Err:509
Err:509
6,365.00
12,730.00
31,825.00
50,920.00
Err:509
4,290.00
Err:509
Err:509
Err:509
25,460.00
63,650.00
63,650.00
254,600.00
HARGA
407,360.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
3,000.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
450,000.00
Err:509
Err:509
231.01
770.04
7,706.35
4,626.92
13,334.32
3,600.00
4,200.00
7,800.00
21,134.32
231.01
770.04
7,706.35
4,626.92
13,334.32
4,500.00
5,250.00
9,750.00
HARGA
23,084.32
231.01
770.04
7,706.35
4,626.92
13,334.32
5,400.00
6,300.00
11,700.00
25,034.32
SNI 2002 Pekerjaan Sanitasi (6.32)
17,339.29
10,410.57
27,749.86
45,000.00
Err:509
Err:509
Err:509
Err:509
526.19
1,732.58
17,339.29
10,410.57
30,008.63
21,000.00
36,750.00
57,750.00
87,758.63
526.19
1,732.58
17,339.29
10,410.57
30,008.63
36,000.00
63,000.00
99,000.00
HARGA
129,008.63
526.19
1,732.58
17,339.29
10,410.57
30,008.63
Err:509
Err:509
Err:509
Err:509
526.19
1,732.58
17,339.29
10,410.57
30,008.63
Err:509
Err:509
Err:509
Err:509
3,819.00
19,095.00
22,914.00
55,000.00
1,500.00
56,500.00
79,414.00
3,819.00
19,095.00
22,914.00
35,000.00
3,500.00
38,500.00
61,414.00
3,819.00
19,095.00
HARGA
22,914.00
55,000.00
5,500.00
60,500.00
83,414.00
11,457.00
57,285.00
68,742.00
Err:509
Err:509
Err:509
Err:509
19,250.89
20,534.28
192,658.76
127,300.00
359,743.93
180,000.00
6,960.00
1,000.00
187,960.00
547,703.93
20,534.28
1,283.39
141,283.09
424,134.45
587,235.21
Err:509
Err:509
Err:509
Err:509
7,128.80
7,128.80
14,130.30
42,518.20
70,906.10
HARGA
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
12,833.93
19,250.89
186,236.79
154,230.71
372,552.32
800,000.00
96,000.00
6,960.00
1,000.00
903,960.00
1,276,512.32
Err:509
Err:509
Err:509
Err:509
Err:509
16,730.00
3,000.00
Err:509
Err:509
1,934.96
3,869.92
5,804.88
Err:509
2,900.00
Err:509
Err:509
HARGA
Err:509
Err:509
3,000.00
Err:509
Err:509
57,285.00
15,276.00
72,561.00
Err:509
Err:509
Err:509
Err:509
Err:509
45,111.47
9,017.67
122,176.91
154,289.53
54,643.48
Err:509
Err:509
Err:509
Err:509
67,104.64
Err:509
3,449,391.70
Err:509
Err:509
Err:509
94,335.71
Err:509
Err:509
Err:509
697,061.09
300,405.50
Err:509
Err:509
HARGA
6,563,420.50
6,563,420.50
6,563,420.50
2,297,197.18
Err:509
157,760.00
54,400.00
190,950.00
95,475.00
9,547.50
9,547.50
Err:509
ANALISA HARGA SATUAN POKOK PEKERJAAN
NAMA PEKERJAAN : Pembangunan Gedung Type B2 ((SDN SAWAHAN IV/343) )
Peralatan:
Sewa Dump Truck ( Dump Truck 5 Ton) 0.250 Jam 65,000.00 16,250.00
Pembantu Tukang / Pekerja 0.250 O.H 127,300.00 31,825.00
Total : 48,075.00
NILAI HSPK : 48,075.00
4 Pembersihan dan Pembuangan Bongkaran Gedung Keluar Lokasi Proye ls.
Buangan Hasil Bongkaran Dinding 8.269 m3 48,075.00 397,532.18
Buangan Hasil Bongkaran Beton - m3 -
Total : 397,532.18
NILAI HSPK : 397,532.18
5 Pembongkaran Rangka Atap dan Penutup Tidak Dipakai Kembali m2
Upah:
Mandor 0.005 O.H 127,300.00 636.50
Pembantu Tukang 0.100 O.H 127,300.00 12,730.00
Total : 13,366.50
NILAI HSPK : 13,366.50
11 Pembongkaran Bekisting m2
Upah
Mandor 0.025 O.H 127,300.00 3,182.50
Pekerja 0.050 O.H 127,300.00 6,365.00
Total : 9,547.50
NILAI HSPK : 9,547.50
12 Kolom Pedestal KPd ( 30/40 ) Beton Bertulang K-225 (f'c = 18,68 Mpa) m 3
Upah
Mandor 0.040 H/O 127,300.00 5,092.00
Tukang batu 0.040 H/O 127,300.00 5,092.00
Pembantu Tukang 0.081 H/O 127,300.00 10,311.30
Jumlah 20,495.30
Bahan
Semen 50 kg 0.010 zak 58,000.00 580.00
Pasir pasang 0.013 m3 100,000.00 1,300.00
Jumlah 1,880.00
Total : 22,375.30
NILAI HSPK : 22,375.30
9 Pekerjaan Acian m2
Upah
Mandor 0.010 H/O 127,300.00 1,273.00
Tukang batu 0.101 H/O 127,300.00 12,857.30
Pembantu Tukang 0.202 H/O 127,300.00 25,714.60
Jumlah 39,844.90
Bahan
Semen 50 kg 0.065 zak 58,000.00 3,770.00
Jumlah 3,770.00
Total : 43,614.90
NILAI HSPK : 43,614.90
E PEKERJAAN LANTAI
1 Pasang Keramik Lantai 40x40 Motif/Warna m2
Upah
Mandor 0.035 H/O 127,300.00 4,455.50
Kepala tukang besi 0.035 H/O 127,300.00 4,455.50
Tukang batu 0.353 H/O 127,300.00 44,936.90
Pekerja 0.707 H/O 127,300.00 90,001.10
Jumlah 143,849.00
Bahan
Keramik 40 x 40 motif/warna 1.050 m2 40,000.00 42,000.00
Semen PC @ 50 kg 0.200 sak 58,000.00 11,600.00
Semen warna 0.500 kg 6,000.00 3,000.00
Pasir pasang 0.045 m3 100,000.00 4,500.00
Jumlah 61,100.00
Total : 204,949.00
NILAI HSPK : 204,949.00
2 2 Pasang Keramik Lantai 40x40 Polos/Warna m2
Upah
Mandor 0.035 H/O 127,300.00 4,455.50
Kepala tukang besi 0.035 H/O 127,300.00 4,455.50
Tukang batu 0.353 H/O 127,300.00 44,936.90
Pekerja 0.707 H/O 127,300.00 90,001.10
Jumlah 143,849.00
Bahan
Keramik 40 x 40 Polos/warna 1.050 m2 40,000.00 42,000.00
Semen PC @ 50 kg 0.200 sak 58,000.00 11,600.00
Semen warna 0.500 kg 6,000.00 3,000.00
Pasir pasang 0.045 m3 100,000.00 4,500.00
Jumlah 61,100.00
Total : 204,949.00
NILAI HSPK : 204,949.00
3 3 Pasang Keramik Lantai 30x30 Motif/Warna m2
Upah
Mandor 0.035 H/O 127,300.00 4,455.50
Kepala tukang besi 0.035 H/O 127,300.00 4,455.50
Tukang batu 0.353 H/O 127,300.00 44,936.90
Pekerja 0.707 H/O 127,300.00 90,001.10
Jumlah 143,849.00
Bahan
Keramik 30 x 30 motif/warna 1.050 m2 38,000.00 39,900.00
Semen PC @ 50 kg 0.200 sak 58,000.00 11,600.00
Semen warna 0.500 kg 6,000.00 3,000.00
Pasir pasang 0.045 m3 100,000.00 4,500.00
Jumlah 59,000.00
Total : 202,849.00
NILAI HSPK : 202,849.00
4 Pemasangan Keramik Dinding 30x60 cm Motif/Warna m2
Upah
Mandor 0.050 O.H 127,300.00 6,365.00
Kepala tukang 0.050 O.H 127,300.00 6,365.00
Tukang batu 0.504 O.H 127,300.00 64,159.20
Pembantu Tukang 1.000 O.H 127,300.00 127,300.00
Jumlah 204,189.20
Bahan
Keramik Dinding Uk. 30x60 Motif/Warna 1.041 m2 45,000.00 46,845.00
Semen PC (50 kg) 0.186 zak 58,000.00 10,788.00
Semen Berwarna Yiyitan 1.500 kg 6,000.00 9,000.00
Pasir pasang 0.018 m3 100,000.00 1,800.00
Jumlah 68,433.00
Total : 272,622.20
NILAI HSPK : 272,622.20
5 Pemasangan Plin Lantai Granite Tile 10x60 cm m1
Upah
Mandor 0.009 H/O 127,300.00 1,145.70
Kepala tukang besi 0.005 H/O 127,300.00 636.50
Tukang batu 0.091 H/O 127,300.00 11,584.30
Pekerja 0.091 H/O 127,300.00 11,584.30
Jumlah 24,950.80
Bahan
Plint Granit Tile10 x 60 1.667 bh 6,000.00 10,002.00
Semen PC @ 50 kg 0.023 zak 58,000.00 1,334.00
Semen warna 0.025 kg 6,000.00 150.00
Pasir 0.003 m3 100,000.00 300.00
Jumlah 11,786.00
Total : 36,736.80
NILAI HSPK : 36,736.80
6 Pemasangan Keramik Step Nosing 10x40 cm m1
Upah
Mandor 0.009 H/O
Kepala tukang besi 0.005 H/O
Tukang batu 0.091 H/O
Pekerja 0.091 H/O
Jumlah
Bahan
Step Nosing 10 x 40 2.500 bh
Semen PC @ 50 kg 0.023 kg
Semen warna 0.025 kg
Pasir 0.003 m3
Jumlah
Total :
NILAI HSPK :
F PEKERJAAN ATAP
1 Baja WF kg
Upah
Mandor 0.003 O.H 127,300.00 381.90
Kepala Tukang 0.006 O.H 127,300.00 763.80
Tukang Las 0.061 O.H 127,300.00 7,765.30
Pembantu Tukang 0.061 O.H 127,300.00 7,765.30
Jumlah 16,676.30
Bahan
Besi Profil WF (Baja Konstruksi) 1.150 kg 4,000.00 4,600.00
Elektroda 0.040 kg 15,000.00 600.00
Cat Meni besi 0.030 kg 25,000.00 750.00
Jumlah 5,950.00
Total : 22,626.30
NILAI HSPK : 22,626.30
2 Pekerjaan Rangka Gording CNP kg
Upah
Mandor 0.003 O.H 127,300.00 381.90
Kepala Tukang 0.006 O.H 127,300.00 763.80
Tukang Las 0.061 O.H 127,300.00 7,765.30
Pembantu Tukang 0.061 O.H 127,300.00 7,765.30
Jumlah 16,676.30
Bahan
Besi Profil CNP (Baja Konstruksi) 1.100 kg 6,000.00 6,600.00
Elektroda 0.040 kg 15,000.00 600.00
Cat Meni besi 0.030 kg 25,000.00 750.00
Jumlah 7,950.00
Total : 24,626.30
NILAI HSPK : 24,626.30
2 Pemasang rangka atap Galvalume Uk 0.8 mm m2
Upah
Mandor 0.005 O.H 127,300.00 636.50
Kepala Tukang Kayu 0.010 O.H 127,300.00 1,273.00
Tukang Kayu 0.100 O.H 127,300.00 12,730.00
Pembantu Tukang 0.400 O.H 127,300.00 50,920.00
65,559.50
Bahan
C Truss Galvalum 2.050 m1 5,500.00 11,275.00
Reng Galvalum 6.300 m1 2,500.00 15,750.00
screw 18.000 bh 500.00 9,000.00
Jumlah 36,025.00
Total : 101,584.50
NILAI HSPK : 101,584.50
3 Baja Plat Dasar T. 4 - 12 mm kg
Upah
Mandor 0.003 O.H 127,300.00 381.90
Kepala Tukang 0.006 O.H 127,300.00 763.80
Tukang Las 0.060 O.H 127,300.00 7,638.00
Pembantu Tukang 0.060 O.H 127,300.00 7,638.00
Jumlah 16,421.70
Bahan
Besi Plat 1.150 kg 13,059.70 15,018.66
Elektroda 0.040 kg 15,000.00 600.00
Cat Meni besi 0.030 kg 25,000.00 750.00
Jumlah 16,368.66
Total : 32,790.36
NILAI HSPK : 32,790.36
4 Pemasangan Genteng Karang Pilang m2
Upah
Mandor 0.008 O.H 127,300.00 1,018.40
Kepala Tukang Kayu 0.008 O.H 127,300.00 1,018.40
Tukang Kayu 0.075 O.H 127,300.00 9,547.50
Pembantu Tukang 0.150 O.H 127,300.00 19,095.00
Jumlah 30,679.30
Bahan
Genteng Karang Pilang 25.000 bh 3,500.00 87,500.00
Jumlah 87,500.00
Total : 118,179.30
NILAI HSPK : 118,179.30
5 Pemasangan Wuwung Karang Pilang m 1
Upah
Mandor 0.002 O.H 127,300.00 254.60
Kepala Tukang Kayu 0.020 O.H 127,300.00 2,546.00
Tukang Kayu 0.200 O.H 127,300.00 25,460.00
Pembantu Tukang 0.400 O.H 127,300.00 50,920.00
Jumlah 79,180.60
Bahan
Semen PC 50 kg 0.160 zak 58,000.00 9,280.00
Pasir Pasang 0.032 bh 100,000.00 3,200.00
Wuwung Genteng Karang Pilang 5.000 bh 8,000.00 40,000.00
Jumlah 52,480.00
Total : 131,660.60
NILAI HSPK : 131,660.60
6 Pemasangan Listplank Kalsiplank m1
Upah
Mandor 0.005 O.H 127,300.00 636.50
Kepala Tukang Kayu 0.020 O.H 127,300.00 2,546.00
Tukang Kayu 0.200 O.H 127,300.00 25,460.00
Pembantu Tukang 0.100 O.H 127,300.00 12,730.00
Jumlah 41,372.50
Bahan
Kalsiplank 8/30 0.330 lnjr 60,200.00 19,866.00
Screw 16.000 bh 500.00 8,000.00
Hollow Metal Furing 4/4 0.750 m1 6,000.00 4,500.00
Hollow Metal Furing 2/4 2.000 m1 4,000.00 8,000.00
Jumlah 40,366.00
Total : 81,738.50
NILAI HSPK : 81,738.50
7 Pemasangan Flashing m 1
Upah
Mandor 0.005 O.H 127,300.00 636.50
Kepala Tukang Kayu 0.020 O.H 127,300.00 2,546.00
Tukang Kayu 0.200 O.H 127,300.00 25,460.00
Pembantu Tukang 0.100 O.H 127,300.00 12,730.00
Jumlah 41,372.50
Bahan
Kalsiplank 8/30 0.330 lnjr 60,200.00 19,866.00
Screw 5.000 bh 500.00 2,500.00
Seng BJLS 40 0.500 m1 22,250.00 11,125.00
Jumlah 33,491.00
Total : 74,863.50
NILAI HSPK : 74,863.50
G PEKERJAAN FINISHING
1 Pemasangan Kusen Profil Aluminium Powder Coating Warna m1
Dark Brown Uk. 4 x 10, Profil 4"
Upah
Mandor 0.002 O.H 127,300.00 254.60
Kepala Tukang Kayu 0.004 O.H 127,300.00 509.20
Tukang Kayu 0.043 O.H 127,300.00 5,473.90
Pembantu Tukang 0.043 O.H 127,300.00 5,473.90
Jumlah 11,711.60
Bahan
Profil Aluminium Powder Coating Warna Dark Brown Profil 4" 1.100 m1 80,000.00 88,000.00
Skrup/Ripet 2.000 bh 550.00 1,100.00
Sealent 0.060 tube 15,000.00 900.00
Jumlah 90,000.00
Total : 101,711.60
NILAI HSPK : 101,711.60
2 Pemasangan Slimar Aluminium Warna Dark Brown 3/8 m1
Upah
Mandor 0.002 O.H 127,300.00 254.60
Kepala Tukang Kayu 0.004 O.H 127,300.00 509.20
Tukang Kayu 0.043 O.H 127,300.00 5,473.90
Pembantu Tukang 0.043 O.H 127,300.00 5,473.90
Jumlah 11,711.60
Bahan
Slimar Aluminium Warna Dark Brown Uk. 3/8 1.100 m1 110,000.00 121,000.00
Skrup/Ripet 2.000 bh 550.00 1,100.00
Sealent 0.060 tube 15,000.00 900.00
Jumlah 123,000.00
Total : 134,711.60
NILAI HSPK : 134,711.60
3 Pemasangan Kaca Mati t : 5 mm Bening m2
Upah
Mandor 0.001 O.H 127,300.00 127.30
Kepala Tukang Kayu 0.015 O.H 127,300.00 1,909.50
Tukang Kayu 0.150 O.H 127,300.00 19,095.00
Pembantu Tukang 0.015 O.H 127,300.00 1,909.50
Jumlah 23,041.30
Bahan
Kaca bening 5 mm 1.100 m2 70,000.00 77,000.00
Jumlah 77,000.00
Total : 100,041.30
NILAI HSPK : 100,041.30
H PEKERJAAN PINTU, JENDELA, BV DAN RAILLING
1 Pasang P2 (Kusen profil-sponeng, Solid Panel, Bouvent Kaca) unit
Profil Aluminium-sponeng Dark Brown Uk. 4 x 10, Profil 4" 8.700 m1 101,711.60 884,890.92
Daun Pintu (Solid Wood Panil ) + Finishing Melamin/Duco 1.500 unit 1,100,000.00 1,650,000.00
Slimar Aluminium - m1 134,711.60 -
Kaca Bening t = 5 mm 0.690 m2 100,041.30 69,028.50
Handle Pintu 1.000 set 190,000.00 190,000.00
Kunci 2x putar 1.000 bh 60,000.00 60,000.00
Engsel Pintu Steinless 3.000 stel 35,000.00 105,000.00
Engsel Casement (Friction Stay 10") - stel 40,000.00 -
Handle+ Lock Casement "Rambucis" - stel 35,000.00 -
Total : 2,958,919.42
NILAI HSPK : 2,958,919.42
2 Pasang P1-a (Kusen profil-sponeng, Solid Panel, Bouvent Kaca) unit
Profil Aluminium-sponeng Dark Brown Uk. 4 x 10, Profil 4" 7.260 m1 101,711.60 738,426.22
Daun Pintu (Solid Wood Panil ) + Finishing Melamin/Duco 1.000 unit 1,100,000.00 1,100,000.00
Slimar Aluminium - m1 134,711.60 -
Kaca Bening t = 5 mm 0.690 m2 100,041.30 69,028.50
Handle Pintu 1.000 set 190,000.00 190,000.00
Kunci 2x putar 1.000 bh 60,000.00 60,000.00
Engsel Pintu Steinless 3.000 stel 35,000.00 105,000.00
Engsel Casement (Friction Stay 10") - stel 40,000.00 -
Handle+ Lock Casement "Rambucis" - stel 35,000.00 -
Total : 2,262,454.71
NILAI HSPK : 2,262,454.71
3 Pasang PT (Kusen profil-sponeng, Double Spandril, Bouvent Kaca) unit
Profil Aluminium-sponeng Dark Brown Uk. 4 x 10, Profil 4" 6.860 m1 101,711.60 697,741.58
Daun Pintu Double Spandril 1.512 m2 1,100,000.00 1,663,200.00
Slimar Aluminium - m1 134,711.60 -
Kaca Bening t = 5 mm 0.200 m2 100,041.30 20,008.26
Handle Pintu 1.000 set 190,000.00 190,000.00
Kunci 2x putar 1.000 bh 60,000.00 60,000.00
Engsel Pintu Steinless 1.500 stel 35,000.00 52,500.00
Engsel Casement (Friction Stay 10") - stel 40,000.00 -
Handle+ Lock Casement "Rambucis" - stel 35,000.00 -
Total : 2,683,449.84
NILAI HSPK : 2,683,449.84
4 Pasang PS (Kusen profil-sponeng, Pintu Double Spandril) unit
Profil Aluminium-sponeng Dark Brown Uk. 4 x 10, Profil 4" 4.620 m1 101,711.60 469,907.59
Daun Pintu Double Spandril 0.973 m2 250,000.00 243,250.00
Slimar Aluminium - m1 134,711.60 -
Kaca Bening t = 5 mm - m2 100,041.30 -
Handle Pintu 1.000 set 190,000.00 190,000.00
Kunci 2x putar 1.000 bh 60,000.00 60,000.00
Engsel Pintu Steinless 1.000 stel 35,000.00 35,000.00
Engsel Casement (Friction Stay 10") - stel 40,000.00 -
Handle+ Lock Casement "Rambucis" - stel 35,000.00 -
Total : 998,157.59
NILAI HSPK : 998,157.59
4 Pasang J5 (Kusen profil-sponeng, Jendela Castment) unit
Profil Aluminium-sponeng Dark Brown Uk. 4 x 10, Profil 4" 13.620 m1 101,711.60 1,385,311.99
Slimar Aluminium 8.980 m1 134,711.60 1,209,710.17
Kaca Bening t = 5 mm 1.280 m2 100,041.30 128,052.86
Engsel Casement (Friction Stay 10") 1.000 stel 40,000.00 40,000.00
Engsel Casement (Friction Stay 24") 3.000 stel 55,000.00 165,000.00
Handle+ Lock Casement "Rambucis" 4.000 stel 35,000.00 140,000.00
Total : 3,068,075.02
NILAI HSPK : 3,068,075.02
5 Pasang J2 (Kusen profil-sponeng) unit
Profil Aluminium-sponeng Dark Brown Uk. 4 x 10, Profil 4" 6.210 m1 101,711.60 631,629.04
Slimar Aluminium - m1 134,711.60 -
Kaca Bening t = 5 mm 1.000 m2 100,041.30 100,041.30
Engsel Casement (Friction Stay 10") - stel 40,000.00 -
Engsel Casement (Friction Stay 24") - stel 55,000.00 -
Handle+ Lock Casement "Rambucis" - stel 35,000.00 -
Total : 731,670.34
NILAI HSPK : 731,670.34
6 Pasang BV2-B (Kusen profil-sponeng, Jendela Castment) unit
Profil Aluminium-sponeng Dark Brown Uk. 4 x 10, Profil 4" 4.660 m1 101,711.60 473,976.06
Slimar Aluminium 4.940 m1 134,711.60 665,475.30
Kaca Bening t = 5 mm 0.360 m2 100,041.30 36,014.87
Engsel Casement (Friction Stay 10") 2.000 stel 40,000.00 80,000.00
Handle+ Lock Casement "Rambucis" 2.000 stel 35,000.00 70,000.00
Total : 1,325,466.23
NILAI HSPK : 1,325,466.23
7 Pasang BV1 (Kusen profil-sponeng, Jendela Castment) unit
Profil Aluminium-sponeng Dark Brown Uk. 4 x 10, Profil 4" 2.720 m1 101,711.60 276,655.55
Slimar Aluminium 2.470 m1 134,711.60 332,737.65
Kaca Bening t = 5 mm 0.180 m2 100,041.30 18,007.43
Engsel Casement (Friction Stay 10") 1.000 stel 40,000.00 40,000.00
Handle+ Lock Casement "Rambucis" 1.000 stel 35,000.00 35,000.00
Total : 702,400.64
NILAI HSPK : 702,400.64
7 Pasang Sunscreen-1 Kisi-kisi Aluminium "LOUVRE" unit
Profil Aluminium-sponeng Dark Brown Uk. 4 x 10, Profil 4" 7.060 m1 101,711.60 718,083.90
Kisi-kisi Angin aluminium "LOUVRE" Untuk Sun Screen 1.700 m2 350,000.00 595,000.00
Total : 1,313,083.90
NILAI HSPK : 1,313,083.90
8 Pasang Sunscreen-2 Kisi-kisi Aluminium "LOUVRE" unit
Profil Aluminium-sponeng Dark Brown Uk. 4 x 10, Profil 4" 12.000 m1 101,711.60 1,220,539.20
Kisi-kisi Angin aluminium "LOUVRE" Untuk Sun Screen 2.960 m2 350,000.00 1,036,000.00
Total : 2,256,539.20
NILAI HSPK : 2,256,539.20
I PEKERJAAN PLAFON
1 Pemasangan Plafond Kals.iboard t=4,5 mm Rangka Plafond m2
Metal Furing
Upah
Mandor 0.075 H/O 127,300.00 9,547.50
Kepala tukang besi 0.025 H/O 127,300.00 3,182.50
Tukang besi 0.150 H/O 127,300.00 19,095.00
Pekerja 0.250 H/O 127,300.00 31,825.00
Jumlah 63,650.00
Bahan
Metal Furing C 1.670 m1 6,000.00 10,020.00
Metal Furing H 0.840 m1 4,000.00 3,360.00
Kalsiboard t = 4,5 mm 0.382 lbr 42,000.00 16,044.00
Paku asbes scrup 4 12.000 bh 500.00 6,000.00
Hanger Suspension Rod dia. 4 mm 2.000 btg 3,000.00 6,000.00
Spring Adjuster 4 mm Rod 2.000 pc 1,100.00 2,200.00
Tape Plafond/Plasband 2.000 m1 6,000.00 12,000.00
Compound Plafond 0.075 zak 12,000.00 900.00
Jumlah 56,524.00
Total : 120,174.00
NILAI HSPK : 120,174.00
2 List Plafon m 1
Upah
Mandor 0.010 H/O 127,300.00 1,273.00
Kepala tukang kayu 0.002 H/O 127,300.00 254.60
Tukang kayu 0.021 H/O 127,300.00 2,673.30
Pekerja 0.021 H/O 127,300.00 2,673.30
Jumlah 6,874.20
Bahan
List Gypsum t = 10 cm 1.000 m1 10,000.00 10,000.00
Lem 0.030 kg 6,000.00 180.00
Jumlah 10,180.00
Total : 17,054.20
NILAI HSPK : 17,054.20
J PEKERJAAN CAT
1 Pengecatan Besi m2
Upah
Mandor 0.009 H/O 127,300.00 1,145.70
Tukang batu 0.091 H/O 127,300.00 11,584.30
Pekerja 0.076 H/O 127,300.00 9,674.80
Jumlah 22,404.80
Bahan
Thinner A 0.837 kg 21,600.00 18,079.20
Compound 0.200 per klg 2,300.00 460.00
Wood Filter 0.200 kg 24,500.00 4,900.00
Clear Gloss 0.200 kg 37,500.00 7,500.00
Shanding 0.500 kg 55,000.00 27,500.00
Kertas Gosok Halus 1.000 lbr 3,000.00 3,000.00
Kertas Gosok Kasar 1.000 lbr 3,000.00 3,000.00
Jumlah 64,439.20
Sewa Peralatan
Sewa Kompresor min 5 jm 0.625 Jam 2,000.00 1,250.00
Jumlah 1,250.00
Total : 88,094.00
NILAI HSPK : 88,094.00
2 Pengecatan Dinding Dalam Baru m2
Upah
Mandor 0.006 O.H 127,300.00 763.80
Tukang batu 0.063 O.H 127,300.00 8,019.90
Pembantu Tukang 0.020 O.H 127,300.00 2,546.00
Jumlah 11,329.70
Bahan
Cat Tembok Dalam 2.5 Kg 0.104 klg 100,000.00 10,400.00
Plamir Tembok 5 Kg 0.100 klg 12,500.00 1,250.00
Kertas Gosok Halus 0.100 lbr 3,000.00 300.00
Jumlah 11,950.00
Total : 23,279.70
NILAI HSPK : 23,279.70
3 Pengecatan Dinding Luar Baru m2
Upah
Mandor 0.006 O.H 127,300.00 763.80
Tukang batu 0.063 O.H 127,300.00 8,019.90
Pembantu Tukang 0.020 O.H 127,300.00 2,546.00
Jumlah 11,329.70
Bahan
Cat Tembok Luar 2.5 Kg 0.104 klg 115,000.00 11,960.00
Cat Dasar Alkali Primer 0.100 kg 12,000.00 1,200.00
Dempul Tembok 0.100 kg 8,000.00 800.00
Kertas Gosok Halus 0.100 lbr 3,000.00 300.00
Jumlah 14,260.00
Total : 25,589.70
NILAI HSPK : 25,589.70
4 Pengecatan Plafon m2
Upah
Mandor 0.006 H/O 127,300.00 763.80
Tukang batu 0.064 H/O 127,300.00 8,147.20
Pekerja 0.020 H/O 127,300.00 2,546.00
Jumlah 11,457.00
Bahan
Cat Tembok Dalam 2.5 Kg 0.104 klg 115,000.00 11,960.00
Kertas Gosok 0.100 lbr 3,000.00 300.00
Jumlah 12,260.00
Total : 23,717.00
NILAI HSPK : 23,717.00
5 Pelapisan Waterproofing m2
Upah
Mandor 0.008 H/O 127,300.00 1,018.40
Tukang batu 0.076 H/O 127,300.00 9,674.80
Pekerja 0.050 H/O 127,300.00 6,365.00
Jumlah 17,058.20
Bahan
Waterproofing 0.350 kg 30,000.00 10,500.00
Serat Fiber 1.000 m2 1,500.00 1,500.00
Jumlah 12,000.00
Total : 29,058.20
NILAI HSPK : 29,058.20
K PEKERJAAN PIPA
1 Pemasangan Pipa air bersih dia 1'' m1
Upah
Mandor 0.002 H/O 127,300.00 254.60
Kepala tukang 0.006 H/O 127,300.00 763.80
Tukang batu 0.060 H/O 127,300.00 7,638.00
Pekerja 0.036 H/O 127,300.00 4,582.80
Jumlah 13,239.20
Bahan
Pipa PVC dia 1" type AW 4 m 0.300 Btg 18,000.00 5,400.00
perlengkapan 35% harga pipa 0.105 Btg 18,000.00 1,890.00
Jumlah 7,290.00
Total : 20,529.20
NILAI HSPK : 20,529.20
2 Pemasangan Pipa air bersih dia 3/4'' m1
Upah
Mandor 0.002 H/O 127,300.00 254.60
Kepala tukang 0.006 H/O 127,300.00 763.80
Tukang batu 0.060 H/O 127,300.00 7,638.00
Pekerja 0.036 H/O 127,300.00 4,582.80
Jumlah 13,239.20
Bahan
Pipa PVC dia 3/4" type AW 4 m 0.300 Btg 15,000.00 4,500.00
perlengkapan 35% harga pipa 0.105 Btg 15,000.00 1,575.00
Jumlah 6,075.00
Total : 19,314.20
NILAI HSPK : 19,314.20
3 Pemasangan Pipa air bersih dia 1/2'' m 1
Upah
Mandor 0.002 H/O 127,300.00 254.60
Kepala tukang 0.006 H/O 127,300.00 763.80
Tukang batu 0.060 H/O 127,300.00 7,638.00
Pekerja 0.036 H/O 127,300.00 4,582.80
Jumlah 13,239.20
Bahan
Pipa PVC dia 1/2" type AW 4 m 0.300 Btg 12,000.00 3,600.00
perlengkapan 35% harga pipa 0.105 Btg 12,000.00 1,260.00
Jumlah 4,860.00
Total : 18,099.20
NILAI HSPK : 18,099.20
4 Pemasangan Pipa air bekas dia 3" m1
Upah
Mandor 0.004 H/O 127,300.00 509.20
Kepala tukang 0.014 H/O 127,300.00 1,782.20
Tukang batu 0.135 H/O 127,300.00 17,185.50
Pekerja 0.081 H/O 127,300.00 10,311.30
Jumlah 29,788.20
Bahan
Pipa PVC dia 3" type AW 4 m 0.300 Btg 105,000.00 31,500.00
perlengkapan 35% harga pipa 0.105 Btg 105,000.00 11,025.00
Jumlah 42,525.00
Total : 72,313.20
NILAI HSPK : 72,313.20
5 Pemasangan Pipa air kotor dia 4" m1
Upah
Mandor 0.004 H/O 127,300.00 509.20
Kepala tukang 0.014 H/O 127,300.00 1,782.20
Tukang batu 0.135 H/O 127,300.00 17,185.50
Pekerja 0.081 H/O 127,300.00 10,311.30
Jumlah 29,788.20
Bahan
Pipa PVC dia 4" type AW P. 4 m 0.300 btg 180,000.00 54,000.00
perlengkapan 35% harga pipa 0.105 btg 180,000.00 18,900.00
Jumlah 72,900.00
Total : 102,688.20
NILAI HSPK : 102,688.20
6 Pasang Kran Air Standart Steinless bh
Bahan
Kran Steinless Standart 1.000 bh 55,000.00 55,000.00
Rol TBA 1.000 roll 1,500.00 1,500.00
Jumlah 56,500.00
Upah
Tukang Batu 0.150 H/O 127,300.00 19,095.00
Pekerja 0.030 H/O 127,300.00 3,819.00
Jumlah 22,914.00
Total : 79,414.00
NILAI HSPK : 79,414.00
7 Pasang Kran Air Wastafel Steinless bh
Bahan
Kran Steinless Standart 1.000 bh 85,000.00 85,000.00
Rol TBA 1.000 roll 1,500.00 1,500.00
Jumlah 86,500.00
Upah
Tukang Batu 0.150 H/O 127,300.00 19,095.00
Pekerja 0.030 H/O 127,300.00 3,819.00
Jumlah 22,914.00
Total : 109,414.00
NILAI HSPK : 109,414.00
8 Pasang Klosed Duduk Porselen bh
Bahan
Kloset Duduk Porselen 1.000 bh Err:509 Err:509
Perlengkapan 6% harga closed 0.060 bh Err:509 Err:509
Jumlah Err:509
Upah
Pembantu Tukang 1.100 H/O 127,300.00 140,030.00
Tukang batu 1.100 H/O 127,300.00 140,030.00
kepala tukang 0.160 H/O 127,300.00 20,368.00
mandor 0.160 H/O 127,300.00 20,368.00
Jumlah 320,796.00
Total : Err:509
NILAI HSPK : Err:509
9 Pasang Kloset Jongkok Porselen bh
Bahan
Kloset Jongkok Porselen 0.001 bh 180,000.00 180.00
Pasir pasang 0.010 m3 100,000.00 1,000.00
Semen portland (50kg) 0.120 zak 58,000.00 6,960.00
Jumlah 8,140.00
Upah
mandor 0.160 H/O 127,300.00 20,368.00
kepala tukang 0.160 H/O 127,300.00 20,368.00
Tukang batu 1.500 H/O 127,300.00 190,950.00
Pembantu Tukang 1.500 H/O 127,300.00 190,950.00
Jumlah 422,636.00
Total : 430,776.00
NILAI HSPK : 430,776.00
10 Pemasangan Washtafel bh
Bahan
Wastafel 1.000 bh 800,000.00 800,000.00
Perlengkapan 12% harga washtafel 0.120 bh 800,000.00 96,000.00
Jumlah 896,000.00
Upah
Mandor 0.100 H/O 127,300.00 12,730.00
Kepala tukang 0.150 H/O 127,300.00 19,095.00
Tukang batu 1.450 H/O 127,300.00 184,585.00
Pembantu Tukang 1.200 H/O 127,300.00 152,760.00
Jumlah 369,170.00
Total : 1,265,170.00
NILAI HSPK : 1,265,170.00
11 Pemasangan Kaca Cermin t : 6 mm m2
Upah
Mandor 0.001 O.H 127,300.00 127.30
Kepala Tukang Kayu 0.015 O.H 127,300.00 1,909.50
Tukang Kayu 0.150 O.H 127,300.00 19,095.00
Pembantu Tukang 0.015 O.H 127,300.00 1,909.50
Jumlah 23,041.30
Bahan
Kaca Cermin 6 mm 1.100 m2 90,000.00 99,000.00
Frame Slimar Aluminium 3.200 m1 12,000.00 38,400.00
Jumlah 137,400.00
Total : 160,441.30
NILAI HSPK : 160,441.30
12 Pasang Tempat Sabun tanam (Porcelain) bh
Upah
Tempat Sabun Tanam (Porcelain) 1.000 bh 12,000.00 12,000.00
Jumlah 12,000.00
Bahan
Mandor 0.005 H/O 127,300.00 636.50
Kepala tukang 0.010 H/O 127,300.00 1,273.00
Tukang batu 0.100 H/O 127,300.00 12,730.00
Pekerja 0.010 H/O 127,300.00 1,273.00
Jumlah 15,912.50
Total : 27,912.50
NILAI HSPK : 27,912.50
13 Pasang Floor Drain (Steinless) bh
Upah
Floor drain 1.000 bh 35,000.00 35,000.00
Jumlah 35,000.00
Bahan
Mandor 0.005 H/O 127,300.00 636.50
Kepala tukang 0.010 H/O 127,300.00 1,273.00
Tukang batu 0.100 H/O 127,300.00 12,730.00
Pekerja 0.010 H/O 127,300.00 1,273.00
Jumlah 15,912.50
Total : 50,912.50
NILAI HSPK : 50,912.50
14 Pasang Roof Drain (Cast Iron) bh
Bahan
Roof drain 1.000 bh 55,000.00 55,000.00
Jumlah 55,000.00
Upah
Mandor 0.005 H/O 127,300.00 636.50
Kepala tukang 0.010 H/O 127,300.00 1,273.00
Tukang batu 0.100 H/O 127,300.00 12,730.00
Pekerja 0.010 H/O 127,300.00 1,273.00
Jumlah 15,912.50
Total : 70,912.50
NILAI HSPK : 70,912.50
15 Pas. Pipa Besi Galvanis Dia. 2,5" Finish Cat Besi m1
Upah:
Mandor 0.0020 H/O 127,300.00 254.60
Tukang Besi 0.0600 H/O 127,300.00 7,638.00
Pekerja 0.0280 H/O 127,300.00 3,564.40
Jumlah 11,457.00
Bahan:
Pabrikasi/Elektroda Baja 0.0060 m2 15,000.00 90.00
Pipa Galvanis Med Diameter 2,5" 1.2000 m1 186,666.67 224,000.00
Cat Besi 0.2393 m2 88,094.00 21,080.89
Jumlah 245,170.89
Sewa Peralatan:
Sewa Welding set (min 5 jam) 0.0210 hr. 1,500.00 31.50
Jumlah 31.50
Total : 256,659.39
NILAI HSPK : 256,659.39
16 Pas. Tangga Monyet Pipa Besi Galvanis Dia. 2,5" Finish Cat Besi unit
Upah+Bahan:
Pipa Besi Galvanis Dia. 2,5" Finish Cat Besi 16.2500 m1 256,659.39 4,170,715.09
Plat Flendes Tb. 8 mm 1.2000 Kg 32,790.36 39,348.43
Anchor Bolt M - 10 40.0000 bh 25,000.00 1,000,000.00
Total : 5,210,063.52
NILAI HSPK : 5,210,063.52
17 Pas. Tutup Manhole Shaft Finish Cat Besi unit
Upah+Bahan:
Plat Bordes Tb. 2 mm 11.6117 Kg 8,800.00 102,182.96
Plat Siku L. 50.50,5 28.7274 Kg 8,800.00 252,801.12
Engsel Besi 2.0000 bh 6,000.00 12,000.00
Anchor Bolt M - 12 4.0000 bh 35,000.00 140,000.00
Baut Dia. 16 mm Double Drat 2.0000 bh 2,000.00 4,000.00
Joint Sealent 0.5000 Tube 150,000.00 75,000.00
Cat Besi 2.1875 m2 88,094.00 192,705.63
Total : 778,689.71
NILAI HSPK : 778,689.71
L PEKERJAAN MEKANIKAL
1 Bak Kontrol bh
Galian Tanah 0.245 m3 131,373.60 32,186.53
Urugan Pasir 0.025 m3 111,463.00 2,786.58
Pasangan Batu Bata 1 : 3 1.000 m2 109,748.20 109,748.20
Plesteran 1 ; 3 1.000 m2 71,051.70 71,051.70
Rabat Beton tebal 8 cm 0.020 m3 721,438.30 14,428.77
Total : 230,201.77
NILAI HSPK : 230,201.77
M PEKERJAAN ELEKTRIKAL
1 Pasang kabel NYY 4 x 6 mm + BC 6 mm m1
Bahan
Kabel NYY 4 x 6 mm 1.000 m 25,000.00 25,000.00
Kabel BC 6 mm 1.000 m 35,000.00 35,000.00
Jumlah 60,000.00
Upah
Pekerja 0.010 O.H 127,300.00 1,273.00
Tukang listrik 0.020 O.H 127,300.00 2,546.00
Kepala Tukang listrik 0.005 O.H 127,300.00 636.50
Jumlah 4,455.50
Total : 64,455.50
NILAI HSPK : 64,455.50
2 Pasng Box MCB (Inbow, Tutup Transparan) bh
Bahan
Box MCB 6 Modul Uk. (252 x 186 x 98) mm 1.000 bh 185,000.00 185,000.00
Jumlah 185,000.00
Upah
Pekerja 0.050 O.H 127,300.00 6,365.00
Tukang listrik 0.200 O.H 127,300.00 25,460.00
Kepala Tukang listrik 0.001 O.H 127,300.00 127.30
Jumlah 31,952.30
Total : 216,952.30
NILAI HSPK : 216,952.30
3 Pemasangan ttk Stop Kontak Gedung ttk
Bahan
Stop Kontak 1.000 bh 8,000.00 8,000.00
Kabel NYM 500 Volt 3 x 2,5 mm2 10.000 m1 6,000.00 60,000.00
Pipa Pralon 5/8 1.000 Lonjor 6,500.00 6,500.00
T Doos Pvc 1.000 bh 1,000.00 1,000.00
Jumlah 75,500.00
Upah
Kepala Tukang Listrik 0.050 O.H 127,300.00 6,365.00
Tukang Listrik 0.200 O.H 127,300.00 25,460.00
Pembantu Tukang 0.001 O.H 127,300.00 127.30
Jumlah 31,952.30
Total : 107,452.30
NILAI HSPK : 107,452.30
4 Pemasangan Titik Stop Kontak AC ttk
Bahan
Stop Kontak AC 1.000 bh 12,000.00 12,000.00
Kabel NYM 500 Volt 3 x 2,5 mm2 15.000 m1 6,000.00 90,000.00
Pipa Pralon 5/8 5.000 Lonjor 6,500.00 32,500.00
T Doos Pvc 1.000 bh 1,000.00 1,000.00
Jumlah 135,500.00
Upah
Kepala Tukang Listrik 0.050 O.H 127,300.00 6,365.00
Tukang Listrik 0.200 O.H 127,300.00 25,460.00
Pembantu Tukang 0.001 O.H 127,300.00 127.30
Jumlah 31,952.30
Total : 167,452.30
NILAI HSPK : 167,452.30
4 Pemasangan Instalasi ttk Lampu Fitting Plafon ttk
Bahan
Isolator 4.000 bh 1,000.00 4,000.00
Kabel NYM 500 Volt 3 x 2,5 mm2 10.000 m1 6,000.00 60,000.00
Pipa Pralon 5/8 1.000 ljr 6,500.00 6,500.00
T Doos Pvc 1.000 bh 1,000.00 1,000.00
Fitting Plafond 1.000 bh 8,000.00 8,000.00
Jumlah 79,500.00
Upah
Kepala Tukang Listrik 0.050 O.H 127,300.00 6,365.00
Tukang Listrik 0.500 O.H 127,300.00 63,650.00
Pembantu Tukang 0.300 O.H 127,300.00 38,190.00
Jumlah 108,205.00
Total : 187,705.00
NILAI HSPK : 187,705.00
5 Pemasangan Saklar Tunggal ttk
Bahan
Saklar Tunggal 1.000 bh 10,000.00 10,000.00
Jumlah 10,000.00
Upah
Kepala Tukang Listrik 0.050 O.H 127,300.00 6,365.00
Tukang Listrik 0.200 O.H 127,300.00 25,460.00
Pembantu Tukang 0.001 O.H 127,300.00 127.30
Jumlah 31,952.30
Total : 41,952.30
NILAI HSPK : 41,952.30
6 Pemasangan Saklar Ganda ttk
Bahan
Saklar Ganda 1.000 bh 10,000.00 10,000.00
Jumlah 10,000.00
Upah
Kepala Tukang Listrik 0.050 O.H 127,300.00 6,365.00
Tukang Listrik 0.200 O.H 127,300.00 25,460.00
Pembantu Tukang 0.001 O.H 127,300.00 127.30
Jumlah 31,952.30
Total : 41,952.30
NILAI HSPK : 41,952.30
7 Pemasangan Split Cooper bh
Bahan
Spit Copper 1.000 bh 30,000.00 30,000.00
Jumlah 30,000.00
Upah
Kepala Tukang Listrik 0.050 O.H 127,300.00 6,365.00
Tukang Listrik 0.200 O.H 127,300.00 25,460.00
Pembantu Tukang 0.001 O.H 127,300.00 127.30
Jumlah 31,952.30
Total : 61,952.30
NILAI HSPK : 61,952.30
8 Pemasangan Grounding Rod BC 50 mm2 ttk
BC 50 mm2 6.000 m1 35,090.00 210,540.00
Pipa 2" GIP 1.000 bh 45,000.00 45,000.00
Sambungan Kawat BC 1.000 ls. Err:509 Err:509
Material Bantu 1.000 oh Err:509 Err:509
Jumlah Err:509
Upah
Kepala Tukang Listrik 0.050 O.H 127,300.00 6,365.00
Tukang Listrik 0.500 O.H 127,300.00 63,650.00
Pembantu Tukang 0.300 O.H 127,300.00 38,190.00
Jumlah 108,205.00
Total : Err:509
NILAI HSPK : Err:509
9 Pemasangan Penangkal Petir
Kabel BC 50 mm2 43.500 m1 35,090.00 1,526,415.00
Klem kabel 43.500 bh 1,500.00 65,250.00
Conection Box -
Lightning Spit -
GS Pipe -
Pipa 0 1 " ( PVC ) 5.000 m1 18,000.00 90,000.00
Ground Rod 1.000 ttk 150,000.00 150,000.00
Bak kontrol 50 x 50 x 50 cm 1.000 ttk 230,201.77 230,201.77
Material bantu & Instalasi penangkal petir 1.000 unit 150,000.00 150,000.00
Test Comisioning dan Perijinan depnaker 1.000 ls. 300,000.00 300,000.00
Total : 2,511,866.77
NILAI HSPK : 2,511,866.77
DAFTAR STANDAR HARGA SATUAN DASAR BAHAN
NAMA : Pembangunan Gedung Type B2 ((SDN SAWAHAN IV/343) )
II BAHAN BATU
1 Batu Pecah 1-2 mesin m3 135,000.00
2 Batu Bata Merah bj 560.00
IV BAHAN BESI
1 Besi Beton Polos/ ulir kg 8,800.00
2 Kawat Beton / Bendrat kg 11,000.00
3 Profil Baja WF kg 4,000.00
4 Baja Canal C kg 6,000.00
5 Baut 12 mm bh 2,500.00
6 Baut Anchor 16 mm 600 mm bh 45,000.00
7 Anchor Bolt m-10 bh 25,000.00
8 Anchor Bolt m-12 bh 35,000.00
9 Plat Bordes Tb. 2 mm Kg 8,800.00
10 Plat Siku L. 50.50,5 Kg 8,800.00
11 Engsel Besi bh 6,000.00
12 Baut Dia. 16 mm Double Drat bh 2,000.00
13 Joint Sealent Tube 150,000.00
14 Ikatan Angin 16 mm bh 20,000.00
15 Main Chanel m1 7,000.00
16 Furring Chanel m1 6,000.00
17 Ususk Galvalum C m' 5,500.00
18 Reng Gavalum m' 2,500.00
19 Jarum Keras Lengkap bh 85,000.00
20 Seng Datar BJLS 40 m1 22,250.00
NO. JENIS / NAMA BAHAN SATUAN HARGA SATUAN KETERANGAN
(Rp.)
1 2 3 4 5
21 Electrode Baja kg 15,000.00
22 Besi Plat 4" X 8" Tebal 12 mm kg 13,059.70
23 Pipa Galvanis Ø2,5" m' 186,666.67
24 Besi hollow 4/4 Metalfuring m1 6,000.00
25 Besi Hollow 2/4 Metalfuring m1 4,000.00
26 Metal Furing C m1 6,000.00
27 Metal Furing H m1 4,000.00
28 Paku asbes scrup 4 bh 500.00
29 Hanger Suspension Rod dia. 4 mm btg 3,000.00
30 Spring Adjuster 4 mm Rod pc 1,100.00
31 Tape Plafond/Plasband m1 6,000.00
32 Compound Plafond zak 12,000.00
V BAHAN KAYU
1 Kayu Meranti balok 6/15 m3 1,100,000.00
2 Kayu Meranti usuk 5/7 m3 1,100,000.00
3 Kayu Meranti bekisting m3 1,100,000.00
4 Daun Pintu SWP Finish Melamine lbr 1,100,000.00
5 Daun pintu Spandrill Alumunium m2 250,000.00
IX BAHAN TRIPLEK
1 Kalsiboard 4,5 mm lbr 42,000.00
2 List gypsum m' 10,000.00
3 Lem gypsum Kg 6,000.00
4 Kalsiplank Lbr 60,200.00
5 Multiplek 110 x 244 x 12 mm Film satu muka lbr 180,000.00
XI BAHAN SANITAIR
1 Closet Jongkok Porselin bh 180,000.00
2 Jet washer bh 90,000.00
3 Kran Air f Standart bh 55,000.00
4 Kran Wastafel bh 85,000.00
5 Tempat Sabun bh 12,000.00
6 Wastafel Complete Set set 800,000.00
7 Floor Drain Stainless Stell bh 35,000.00
8 Roof Drain Metal + Chasing bh 55,000.00
9 Rol TBA roll 1,500.00
KETERANGAN
Lokal
Lumajang
Lumajang
Mojokerto
Mojosari
Holcim
Holcim
Hanil
Hanil
Garuda
Garuda
terpasang
Smart Truss
Smart Truss
terpasang
KETERANGAN
Smart Truss
Smart Truss
Duma Terpasang
Wavin
Wavin
Wavin
Wavin
Wavin
Paltinum
Paltinum
Paltinum
Paltinum
Paltinum
Wisma
Wisma
KETERANGAN
Jayaboard
Jayaboard
Nusa
Dekson
Dekson
Dekson
Alexindo
Alexindo
Alexindo
terpasang
Dekson
Dekson
AMSTAD
AMSTAD
AMSTAD
AMSTAD
AMSTAD
TOTO
AMSTAD
AMSTAD
terpasang
KETERANGAN
Panasonic
Panasonic
Panasonic
Panasonic
eterna
eterna
eterna
Ex. Panasonic
Ex. Philips
Ex. Philips
Ex. Philips
terpasang
KETERANGAN
5
HILTI
DAFTAR STANDAR HARGA SATUAN DASAR UPAH
NAMA : Pembangunan Gedung Type B2 ((SDN SAWAHAN IV/343) )
HARGA SATUAN
NO. URAIAN TENAGA KERJA SATUAN KETERANGAN
(Rp.)
1 2 3 4 5
1 Mandor O.H 127,300.00
2 Kep. Tukang Gali Tanah O.H 127,300.00
3 Kep. Tukang Batu O.H 127,300.00
4 Kep. Tukang Kayu O.H 127,300.00
5 Kep. Tukang Besi O.H 127,300.00
6 Kep. Tukang Cat O.H 127,300.00
7 Kep. Tukang Listrik O.H 127,300.00
8 Kep. Tukang Pipa O.H 127,300.00
9 Tukang Gali Tanah O.H 127,300.00
10 Tukang Batu O.H 127,300.00
11 Tukang Kayu O.H 127,300.00
12 Tukang Besi O.H 127,300.00
13 Tukang Cat O.H 127,300.00
14 Tukang Listrik O.H 127,300.00
15 Tukang Pipa O.H 127,300.00
16 Tukang Politur O.H 127,300.00
17 Tukang Las O.H 127,300.00
18 Pembantu Tukang/ Pekerja O.H 127,300.00
19 Surveyor Geodesi O.H 127,300.00
DAFTAR STANDAR HARGA SATUAN DASAR PERALATAN
NAMA : Pembangunan Gedung Type B2 ((SDN SAWAHAN IV/343) )
HARGA SATUAN
NO. URAIAN / NAMA ALAT SATUAN KETERANGAN
(Rp.)
1 2 3 4 5
BAB I
PENDAHULUAN
A. LATAR BELAKANG
Latar belakang Pembangunan Gedung Type B2 ((SDN SAWAHAN IV/343) ) di kota Suraba
kebutuhan masyarakat khususnya di wilayah Surabaya selatan dan pada umumnya masyarakat k
mendapatkan Sarana atau tempat pendidikan yang lebih luas dan memadai. Adapun Pening
Prasarana gedung sekolah pada saat ini sangat diperlukan dalam menghadapi era Globalisasi
masyarakat yang adil dan makmur mencerdaskan kehidupan bangsa, memberantas kemiskinan. O
pendidikan ini dengan meningkatkan mutu pendidikan dan dibangunnya fasilitas gedung sekola
tujuan Pembangunan Pemerintah Kota Surabaya.
B. MAKSUD DAN TUJUAN
Adapun maksud dan tujuan Pembangunan Gedung Type B2 (SDN SAWAHAN IV / 343) adalah
Program Pemerintah Kota Surabaya khususnya Dinas Pendidikan Kota Surabaya bekerja sama d
Karya Tata Ruang untuk meningkatkan mutu Pendidikan melalui Pembangunan /Rehabilitas
Pendidikan Dasar Sembilan Tahun di wilayah Kota Surabaya.
C. LINGKUP PEKERJAAN
Adapun lingkup pekerjaan Pembangunan Gedung Type B2 (SDN SAWAHAN IV / 343) di Surabaya m
A PEKERJAAN LANTAI 3
I PEKERJAAN PERSIAPAN
II PEKERJAAN BETON
III PEKERJAAN PASANGAN DAN PLESTERAN
IV PEKERJAAN KUSEN PINTU JENDELA DAN PENGGANTUNG
V PEKERJAAN LANTAI
VI PEKERJAAN TANGGA
VII PEKERJAAN INSTALASI LISTRIK
VIII PEKERJAAN PLAFOND
IX PEKERJAAN DINDING RAILING BALKON
X PEKERJAAN PENGECATAN
XI PEKERJAAN DINDING FASADE DEPAN
XII PEKERJAAN JEMBATAN PENGHUBUNG
XIII PEKERJAAN ATAP GEDUNG
XIV PEKERJAAN LAIN - LAIN
Metode pelaksanaan ini secara umum mencakup pekerjaan Pembangunan Gedung Type B
IV / 343) dimana pada pelaksanaanya Pekerjaan di lantai 1, 2 dan 3. Sesuai dengan kondisi lapanga
bangunan lantai 1 dan lantai 2 sudah dikerjakan sebelumnya, maka pekerjaan ini melanjutkan dari l
Dalam uraian umumnya akan kami kerjakan struktur di lantai 3 dan atap setelah itu kami beranjak k
arsitektural dan Finishing. Adapun tahapan urutan pekerjaan dan tata cara pelaksanaan Pembangun
(SDN SAWAHAN IV / 343) di kota Surabaya sebagai berikut:
PEKERJAAN GEDUNG
II - 1 Sebelum melaksanakan pekerjaan utama maka dilakukan pekerjaan persiapan diantaranya
melaksanakan pekerjaan persiapan dengan mengadakan Uitzet di lokasi dengan alat W
,Pemasangan jaring pengaman, Pagar pembatas proyek dan pengamanan area sekitar pek
menggangu aktifitas kegiatan belajar mengajar. setelah pekerjaan persiapan selesai kemudian
Pemasangan bouwplank. Dalam Pelaksanaan pekerjaan pembersihan lapangan yang perlu d
lapangan harus dibersihkan dari kotoran dedaunan atau yang lainnya serta kondisi lapangan tetap
II - 2 Sehubungan dengan pekerjaan ini adalah pekerjaan lanjutan dalam pembangunan lantai 3 dimana
sudah dikerjakan sebelumnya , maka pengukuran dan bouwplank dilakukan oleh kontraktor dengan
kolom struktur pada bangunan lantai 2 tentunya sesuai dengan gambar rencana yang ada dan diset
pengawas. Adapun pekerjaan kolom lantai 3 harus sesuai dengan gambar yang meneruskan dari ko
sebelumnya. Setelah pengukuran dan bouwplank selesai dikerjakan kemudian dilanjutkan ke pekerja
II -3 Selanjutnya setelah pekerjaan pengukuran dan bouwplank selesai dilanjutkan ke pekerjaan kol
Adapun untuk proses Pembuatan bekesting Kolom struktur terbuat dari bahan Kayu meranti beki
balok , paku usuk, Triplek Tego Film,Minyak Bekesting yang dioleskan pada permukaan kayu
II -4 Selanjutnya setelah pekerjaan Kolom strkutur selesai dilanjutkan ke pekerjaan Balok struktur ut
proses Pembuatan bekesting Balok struktur terbuat dari bahan Kayu meranti bekisting, Kayu merant
Triplek tego film satu muka,Minyak Bekesting yang dioleskan pada permukaan kayu meranti bekest
maupun bentuk bekesting untuk masing -masing pekerjaan Balok Struktur , serta bahan kayu ya
masing pekerjaan balok tersebut harus disesuaikan dengan gambar perencanaan. Kemudian pekerja
struktur tersebut dirakit sedemikian rupa setelah pekerjaan pembesian balok stuktur telah selesai d
Adapun bahan kayu meranti baik kayu meranti papan, kayu balok , triplek harus mempunya
tidak cacat, keropos dan lurus serta disetujui oleh konsultan pengawas. Bahan besi yang dipakai
terbuat dari besi baja Ulir/ berprofil dengan mutu baja U-32, dan besi baja polos dengan mutu
diameter besi baja disesuaikan dengan ukuran pada gambar perencanaan. Untuk Proses pengec
harus dilakukan setelah pembesian dan pembuatan bekesting Balok selesai .
Adapun pekerjaan pengecoran beton bertulang untuk balok struktur yang digunakan memaka
dengan menggunakan mobil ready mix,Tentunya disesuaikan dengan dimensi gambar dan diset
pengawas. Adapun Pelaksanaan Pengecoran dapat memakai alat pompa concret / congcret Pump
alat pemadatan berupa Vibrator.
II -5 Selanjutnya setelah pekerjaan Balok struktur selesai lanjutkan ke pekerjaan Plat lantai/Plat
Pelaksanaan pekerjaan Struktur Plat Lantai / Plat talang beton bertulang maka yang perlu diperhat
pelaksanaan dari pada pekerjaan struktur plat tersebut. Sebelum Pembuatan Bekesting struktur p
perlu dipasang perancah menggunakan scafolding yang dipasang tegak lurus dengan permuk
bekesting plat lanti/ plat atap sebasai penyokong konstruksi bekesting plat agar menjadi kokoh dan
perancah kayu gelam / usuk meranti disarankan memakai 50 cm-60 cm agar diperoleh hasil pera
menahan beban pada saat pengecoran. Bahan kayu yang digunakan untuk perancah harus
Adapun untuk proses Pembuatan bekesting Plat lantai/Plat atap beton terbuat dari bahan Kayu
Kayu Meranti balok 3/5, paku usuk, Triplek uk. 110x244 t= 9mm film satu muka,Minyak Bekesting y
permukaan kayu meranti bekesting. Adapun ukuran maupun bentuk bekesting untuk masing -ma
lantai/plat atap beton , serta bahan kayu yang digunakan pada masing pekerjaan plat lantai/plat a
harus disesuaikan dengan gambar perencanaan. Kemudian pekerjaan bekesting plat lantai/plat a
dirakit sedemikian rupa setelah pekerjaan pembesian plat lantai/plat atap beton telah selesai dipab
Adapun bahan kayu meranti baik kayu meranti papan, kayu balok , triplek harus mempunya
tidak cacat, keropos dan lurus serta disetujui oleh konsultan pengawas. Bahan besi yang dipakai
terbuat dari besi baja Ulir/ berprofil dengan mutu baja U-32, dan besi baja polos dengan mutu
diameter besi baja disesuaikan dengan ukuran pada gambar perencanaan. Untuk Proses pengeco
atap beton harus dilakukan setelah pembesian dan pembuatan bekesting plat lantai/plat atap beton
Adapun pekerjaan pengecoran beton bertulang untuk plat lantai menggunakan mutu beton K-2
atap beton yang digunakan memakai mutu beton K-250 dengan menggunakan mobil ready mix Te
dengan dimensi gambar dan disetujui oleh konsultan pengawas. Adapun Pelaksanaan Pengecoran d
pompa concret / congcret Pump, dengan memakai alat pemadatan berupa Vibrator.
II - 6 Setelah pekerjaan Struktur selesai kemudian masuk ke pekerjaan atap. Adapun pelaksanaan
bersamaan dengan pekerjaan plesteran dinding, dan tahapan pekerjaan atap diuraikan sebagai beri
Sebelum membuat Kuda-Kuda Baja WF. 200.100.5,5.8 Kontaktor harus membuat gambar kerja
konsultan pengawas perihal mengenai Dimensi Ukuran Kuda-kuda baja, Plat simpul/sambungan, Pla
disetujui oleh pihak konsultan pengawas. Pembuatan kuda-kuda baja / Pabrikasi kuda-kuda dilaksan
datar dengan lantai kerja yang keras. Jika Pabrikasi dilaksanakan diluar harus meminta ijin ko
Pemotongan menggunakan mesin Standart, Pengeboran Plat Baja menggunakan mesin Bor. U
bagian bekas pemotongan dan pengeboran lubang baja dapat menggunakan mesin grenda agar ha
Pengelasan harus menggunakan Mesin Las yang memenuhi standart yang telah ditentukan dan pe
Sebelum Erection kuda- kuda baja dilaksanakan maka perlu distel baut Angkur termasuk plat ple
masing kolom yang menjadi landasan / plendes dari kuda-kuda baja. Plat Plendes Baja distel de
benar-benar mempunyai posisi yang datar dan lurus pada masing-masing kedudukan As Kolom
Kemudian Angkur baja dilas Pada besi tulangan kolom agar tetap dan tidak berubah posisi.
pengelasan Angkur baru kolom di cor dengan memakai beton mutu K- 250.
Setelah Kuda-kuda baja selesai baru dipasang Gording CNP 150.65.20.2,3 terletak diatas kuda-kuda
penguat Gording memakai dudukan besi siku L 50.50.5 Kemudian Dipasang Penggantung Gording d
polos Ø 12 mm yang berfungsi sebagai pengaku / trekstang Gording Canal tersebut. Kemudian dip
dari besi baja polos Ø 12 mm yang dilas dan disambung dengan sebuah jarum keras pada masing-m
Setelah Gording terpasang kuat dan kokoh pekerjaan kemudian dilanjutkan dengan pemasang
Galvalum, adapun bahan Usuk galvalum menggunakan Galvalum Profil C Uk,75 tebal 0,55mm dan r
Uk 3,6 tebal 0,5mm Sebelum pemasagan kontraktor wajib memberikan contoh barang kepada Kons
Direksi untuk meminta persetujuan bahan. Jarak usuk dan reng disesuaikan dengan gambar dan RKS
Untuk Penutup Atap dilaksanakan setelah pekerjaan Kuda-kuda , Gording dan usuk reng terpasang
atap dipasang memakai bahan atap Genteng karang pilang dan wuwung genteng karang pilan
kwaliatas KW I Adapun bahan Genteng dan wuwung genteng yang digunakan mempunyai ukuran,
Dan tidak mudah pecah dan cacat serta memenuhi standart dan disetujui oleh pihak konsultan p
pemasangan genteng wuwung dilaksanakan perlu dipasang papan kompres+ flashing, dan bahan
memakai kayu meranti papan 2/20 setelah itu diberi spesi cmpuran 1 PC : 3 Ps sebagai pereka
Untuk Pemasangan Listplank dengan menggunakan bahan Kalsiplank dengan rangka penguat siku
II -7 Selanjutnya kini menginjak ke pekerjaan tahap selanjutnya yaitu pasangan dinding menggunakan b
metode pelaksanaan pekerjaanya sebagai berikut :
Sebelum pemasangan bata ringan tarik benag antar sudut - sudut dinding bantu dengan alat waterp
dinding, setelah itu kita menginjak ke lapisan dasar. Untuk pengerjaan awal lapisan dasar gunakan a
tebarkan secara merata ke area permukaan/ layer kemudian letakan batu bata merah dengan ukura
kira 5x11x22 diatas adukan kemudian tekan hingga permukaan blok rata dengan benang dan gunak
untuk memeriksa kerataan. gunakan PM-100 untuk perekat vertikal blok. bersihkan permukaan blok
memasang lapisan baru. Selain kolom dan balok yang sudah ditentukan dalam gambar maka setiap
pasangan batu bata merah harus diberi tulangan extra diameter 12 mm kearah horisontal dan vertik
sambungan-sambungan vertikal dari kolom beton dengan dinding, Pemborong harus memberi batan
baja lunak yang berdiameter 8 mm panjang 50 cm (15 cm /dibengkok masuk pada beton dan 35 cm
pasangan. dan dipasang setiap jarak 50 cm. dan Seluruh permukaan pasangan bata merah luar dan
harus disiar secara rapi dengan kedalaman lubang yang sama dan lurus dan seluruh permukaan bat
II -8 Selanjutnya setelah pekerjaan Pasangan dinding selesai dilaksanakan baru dilanjutkan ke pekerjaa
dengan menggunakan semen mortar dengan tebal plesteran dinding 1,5 - 3 cm. Untuk Pekerjaan Ple
dengan komposisi campuran 1 Pc : 4 Ps dilaksanakan pada pasangan dinding bata 1Pc :2 Ps sekelilin
toilet, dinding eksterior, dan bagian-bagian yang ditentukan / disyaratkan dalam detail gambar ruan
ketebalan 1,5 - 3 cm. setelah plesteran 1Pc :4 Ps selesai dilaksanakan. Adapun bahan campuran Ple
tebuat dari adonan Pasir, Semen dan Air yang dicampur dengan menggunakan alat Mixer. Untuk Pel
Pekerjaan Plesteran dilkukan minimal setelah 8 hari dari pelaksanaan pekerjaan pasangan dinding.
II - 10 Selanjutnya setelah pekerjaan Atap selesai dikerjakan kemudian diikuti Pekerjaan selanjutnya
Plafond . Plafond kali ini dilaksanakan dengan memakai bahan rangka metal furing dengan kualitas
standard. Rangka plafon dipasang sesuai dengan gambar perencana dengan memakai hanger
kawat penggantung. Alat pemotong metal hollow dengan menggunakan gunting potong yang sesu
Dan untuk membuat rangka penggantung plafond dapat menggunakan alat pistol ramset yang
berhubungan dengan dek beton. Untuk sambungan rangka plafond dapat menggunakan bahan
dimasukan pekerjaan instalasi listrik / pekerjaan titik lampu, pipa listrik. Setelah selesai rangka pl
dapat memggunakan Kalsiboard dengan tebal 4,5 mm. Untuk pemasangan penutup plafon kalsiboa
sekrup baja yang dibor dengan memakai bor listrik yang telah memenuhi standard. Alat pemoton
menggunakan Alat Gergaji potong dari besi dan untuk menutup sambungan kalsiboard dapat m
bubuk casting, perban yang dicampur dengan lem dan air sebagai perekat. Sedangkan
II - 11 Kemudian pada saat pekerjaan plafond dilaksanakan dapat diikuti oleh pekerjaan Elektrikal d
Pekerjaan Pasang Titik Lampu, Pasang Titik Kontak, Pasang Saklar Tunggal dan saklar Ganda. Ke
dengan pemasangan Lampu LED, pemasangan Box panel mini. dan pasang penangkal petir.
II - 12 Selanjutnya setelah Pekerjaan plafond selesai dilaksanakan diikuti dengan Pekerjaan Kusen,
Dalam Pekerjaan kali ini untuk pekerjaan kusen pintu dan jendela bahan yang digunakan dari Kusen
kualitas yang baik, memenuhi standart dan disetujui oleh konsultan pengawas. Pabrikasi Kusen Alu
dengan ukuran Pintu dan Jendela yang telah disebutkan dalam gambar dan memakai kusen Al
(Casement). Setelah pekerjaan kusen Aluminium terlaksana maka dibuat selimar daun jendela yang
Selimar Aluminium dengan ukuran 3/8" (Casement) yang disambung dengan menggunakan sekr
Pemotongan Kusen Aluminium maupun Selimar Aluminium dapat menggunakan mesin pem
dengan mata pisau Circle yang tajam dan memenuhi standart. Penumpulan bagian bekas hasil
menggunakan mesin grenda agar permukaan bekas potongan lebih rapi dan diberi silent. Pemasang
Jendela Aluminium dapat menggunakan skrup / dinabold dengan dibor pada dindng tembok yang su
dengan gambar penempatan pintu dan jendela. Untuk Pekerjaan Daun pintu menggunakan pabrika
Panel. Pemasangan Daun Pintu menggunakan Engsel dari besi plat yang telah memenuhi st
pemasangan Kunci pintu, grendel, Hak Angin dan dipasang kaca bening dengan tebal 5 mm.Untuk
II - 13 Selanjutnya setelah Pekerjaan Kusen Pintu dan Jendela selesai dilanjutkan dengan Pekerjaan L
Dalam pekerjaan Lantai dan keramik ini memakai Bahan jenis keramik dengan kwaliatas KW I, mem
disetujui oleh pihak konsultan penagwas. Jenis Keramik yang digunakan disesuaikan dengan u
gambar. Untuk ukuran keramik lantai meliputi Tegel Keramik 40x40 (motif/warna gelap) ,Step N
ukuran 5x40 Cm. Sebelum Pemasangan Keramik lantai dimulai terlebih dahulu dilakukan pengur
ketebalan sesuai dengan RKS/persetujuan pengawas. Setelah permukaan lantai rata dibawah la
spesi dengan komposisi campuran 1 : 4 yang telah diaduk dengan mixer / mesin molen hingga m
spesi dengan ketebalan 1,5 - 2 cm dipasang dibawah keramik. Sebelum keramik dipasang perlu dir
terlebih dahulu agar pemasangan dapat lebih rekat. Untuk Pelaksanaan pekerjaan Keramik Lant
jarak antara siar/keping keramik 2-3 mm dan nat antar keramik harus sama lebar dan lurus. Permu
maupun keramik dinding yang terpasang harus datar. Untuk mngisi ruang antar nat keramik d
bahan Semen warna sebagai perekat agar hasilnya lebih rapi. Adapun alat pemotong keramik den
II - 14 Selanjutnya setelah pekerjaan Lantai dan Keramik selesai dapat diikuti Pekerjaaan Sanitair yang
Jenis pekerjaan diantaranya adalah Pemasangan Pipa saluran air Hujan dengan memakai pipa PVC
AW,yang telah memenuhi standart yang baik. yang tentunya semua bahan yang dipakai dalam
harus disetujui oleh pihak konsultan Pengawas.
II - 15 Selanjutnya Pekerjaan Pengecatan diberlakukan sebagai bagian dari tahap pekerjaan finishin
nilai seni Arsitektur dalam menentukan suatu keindahan, model dan warna dari bangunan it
pekerjaan pengecatan
Pengecatan yang
Dinding dilaksanakan
baik meliputi
interior maupun beberapa
eksterior, pekerjaan yaitu
pengecatan : pengecatan kayu m
plafon,
pekerjaan Pengecatan Dinding baik interior maupun eksterior, pengecatan plafon semua diawali
Untuk tahap yang pertama sebelum pengecatan dinding dimulai terlebih dahulu dinding setelah di
2x sampai rata untuk menghaluskan permukaan palmir dinding agar permukaan dinding lebih ra
alat kertas gosok yang digunakan untuk menggosok bagian plamiran dinding yang tidak rata. Selan
kedua baru menggunakan Cat tembok dengan menggunakan sebuah alat Roll, atau Kuas untuk me
Dalam proses pengecatan dapat dilakukan 2-3 kali pengecatan hingga merata. Adapun Bahan ya
pengecatan harus memiliki kualitas yang baik, warna cat tidak mudah pudar dan memenuhi s
disetujui oleh pihak konsultan pengawas.
II - 16 Untuk metode pemasangan batu alam andesit dapat kami uraikan sebagai berikut :
Sebelum pemasangan pemborong dapat mengajukan persetujuan material/ Approval yang akan dig
dinding dibersihakan dari kotoran dan debu kemudian disiram terlebih dahulu sebelum ditebar aduk
andesit/batu templek. Pasang benang untuk bantuan mendapatkan pasangan permukaan dinding ba
templek yang rata dan garis siar/nat yang lurus. Buat adukan untuk melekatkan batu andesit/templ
pemasangan batu andesit/templek yang nantinya dijadikan acuan untuk pemasangan berikutnya Ke
batu andesit/templek selanjutnya pada permukaan dinding dengan acuan pasangan kepalaan batu a
dibuat. Batu andesit/templek dipasang pada dinding sampai dengan ketinggian yang direncanakan,
waterpass untuk kerataan pemasangan batu andesit/templek. Setelah pemasangan batu andesit/te
biarkan beberapa saat untuk mengeluarkan udara yang ada dalam adukan pasangan batu andesit/te
baru dilanjutkan dengan pekerjaan perapihan/finish garis siar/nat. Pekerjaan terakhir adalah pembe
pasangan batu andesit/templek dari sisa adukan semen kemudian untuk finishing dapat menggunak
BAB III
URAIAN PEKERJAAN UTAMA
Uraian Metode pelaksanaan pekerjaan yang berupa metode kerja alat, penggunaan bahan dan
Hanya untuk pekerjaan utama Pekerjaan Pembangunan Gedung Type B2 (SDN SAWAHAN IV / 3
Sebagai berikut :
PENUTUP ATAP
- Pada pekerjaan ini direncanakan
Durasi waktu pelaksanaan : 2 Minggu
- Peralatan yang digunakan
Mesin Potong /Gerindra : 1 Buah
Alat Bantu : 2 Buah
- Tenaga Kerja
Mandor 3.168 O.H = 0.2640 O.H
Kepala Tukang 3.168 O.H = 0.2640 O.H
Tukang 29.701 O.H = 2.4751 O.H
Pembantu Tukang 59.402 O.H = 4.9501 O.H
- Sumber Daya Material
Genteng karang pilang / wisma 9,900.25 Buah = ### Buah
KALSIPLANK
- Pada pekerjaan ini direncanakan
Durasi waktu pelaksanaan : 2 Minggu
- Peralatan yang digunakan
Mesin Potong /Gerindra : 1 Buah
Alat Bantu : 2 Buah
Bor listrik : 2 Buah
- Tenaga Kerja
Mandor 0.671 O.H = 0.0559 O.H
Kepala Tukang 2.685 O.H = 0.2237 O.H
Tukang 26.848 O.H = 2.2373 O.H
Pembantu Tukang 13.424 O.H = 1.1187 O.H
- Sumber Daya Material
Kalsiplank 40x240x0.8cm 134.24 m1 = ### m1
Sekrup 536.96 bh = ### bh
Hollow 2/4 134.24 m1 = ### m1
3 PEKERJAAN PASANGAN DAN PLESTERAN
Untuk Pekerjaan pasangan dan plesteran agar sesuai schedule yang kami buat maka kebutuhan ba
pekerja dapat kami uraikan sebagai berikut :
PEKERJAAN PASANGAN BATA RINGAN
Pada pekerjaan ini direncanakan
Durasi waktu pelaksanaan : 4 Minggu
Peralatan yang digunakan
Cangkul : 4 Buah
Sekrop : 4 Buah
Cetok : 4 Buah
Arco : 2 Buah
Mini mixer : 2 Buah
Tenaga Kerja
Mandor 2.96 O.H = 0.12 O.H
Kepala Tukang 2.96 O.H = 0.12 O.H
Tukang 29.59 O.H = 1.23 O.H
Pembantu Tukang 88.76 O.H = 3.70 O.H
Sumber Daya Material
Perekat bata ringan 31.07 Zak = 1.29 Zak Per
alat bantu 295.88 ls = 12.33 ls hari
Per
Bata ringan tb 10 cm 29.59 m3 = 1.23 m3 hari
Per
hari
PEKERJAAN ACIAN MORTAR DINDING
Pada pekerjaan ini direncanakan
Durasi waktu pelaksanaan : 4 Minggu
Peralatan yang digunakan
Ember : 4 Buah
Sipatan : 3 Buah
Mini Mixer : 2 Buah
Unting- unting : 1 Buah
Cetok : 3 Buah
Tenaga Kerja
Mandor 5.92 O.H = 0.25 O.H
Kepala Tukang 5.92 O.H = 0.25 O.H
Tukang 59.18 O.H = 2.47 O.H
Pembantu Tukang 118.35 O.H = 4.93 O.H
Sumber Daya Material
Semen Mortar 38.47 Zak = 1.60 Zak Per
Alat bantu 591.77 ls = 24.66 ls hari
Per
hari
4 PEKERJAAN KUSEN, PINTU DAN JENDELA
Untuk Pekerjaan Kusen pintu dan jendela agar sesuai schedule yang kami buat maka kebutuhan ba
pekerja dapat kami uraikan sebagai berikut :
PEKERJAAN KUSEN PINTU DAN JENDELA
Pada pekerjaan ini direncanakan
Durasi waktu pelaksanaan : 3 Minggu
Peralatan yang digunakan
Mesin Potong Aluminium : 2 Buah
Bor : 4 Buah
Alat Bantu tukang : 4 Buah
Waterpas : 2 Buah
Tenaga Kerja
Mandor 1.08 O.H = 0.06 O.H
Kepala Tukang 2.20 O.H = 0.12 O.H
Tukang 22.03 O.H = 1.22 O.H
Pembantu Tukang 22.03 O.H = 1.22 O.H
Sumber Daya Material
Aluminium Profil 4" powder coating 405.06 m1 = 22.50 m1 Per
Slimar Alumunium 3/8 158.49 m1 = 8.80 m1 hari
Per
Skrup/Ripet 1,024.64 Buah = 56.92 Buah hari
Per
hari
Sealent 30.74 tube = 1.71 tube Per
Daun pintu SWP Uk. 90 x 210 cm 15.00 Unit = 0.83 Unit hari
Per
Pasang Kaca Bening 5mm 28.78 m2 = 1.60 m2 hari
Per
Engsel Pintu 102.00 Stel = 5.67 Stel hari
Per
Friction stay 134.00 Bh = 7.44 Bh hari
Per
Casemen lock 67.00 Bh = 3.72 Bh hari
Per
hari
5 PEKERJAAN DINDING FASADE DEPAN
Untuk Pekerjaan Pondasi agar sesuai schedule yang kami buat maka kebutuhan bahan dan alat sert
kami uraikan sebagai berikut :
PEKERJAAN PASANGAN BATA DAN PLESTERAN
Pada pekerjaan ini direncanakan
Durasi waktu pelaksanaan : 2 Minggu
Peralatan yang digunakan
Cangkul : 4 Buah
Sekrop : 4 Buah
Cetok : 4 Buah
Arco : 2 Buah
Molen : 1 Buah
Tenaga Kerja
Mandor 0.868 O.H = 0.072 O.H
Kepala Tukang 0.579 O.H = 0.048 O.H
Tukang 5.787 O.H = 0.482 O.H
Pembantu Tukang 17.361 O.H = 1.447 O.H
Sumber Daya Material -
Semen portland (50kg) 13.31 Zak = 1.109 Zak Per hari
Pasir Pasang 2.49 m3 = 0.207 m3 Per hari
Batu Bata Merah uk 22 x 11 x 4.5 c 3,761.55 Buah = ### Buah Per hari
BAB IV
URAIAN PEKERJAAN PENUNJANG
- Pekerjaan penunjang ini juga sangat berpengaruh terhadap kelancaran pekerjaan. Ada
- harus diperhatikan
Persiapan dalam
lahan harus hal ini sebelum
disiapkan menyangkut .
memulai pekerjaan agar pekerjaan berjalan lanca
- Pemasangan Rambu-rambu agar warga mengetahui adanya pekerjaan ini, agar tidak terjad
- Menyediakan tempat material, Akses keluar masuk bahan material, agar tidak menggangg
- Pembersihan lokasi, ini dilakukan setelah pekerjaan selesai 100 % dengan membersihka
sehingga kita sebagai kontraktor menyerahkan pekerjaan dalam keadaan benar-benar 100
BAB V
PENUTUP
1 Demikian Metode Pelaksanaan ini dibuat sebagai acuan dalam pekerjaan dilapangan
langkah-langkah apa yang harus dikerjakan sebelum, dan sesudah pekerjaan di lakukan
2 Metode pelaksanaan ini dibuat agar suatu bangunan terbangun sesuai BESTEK yang sudah
3 Semoga dengan adanya Metode Pelaksanaan ini dapat tercapainya suatu pekerjaan yang t
Surabaya, 03
CV PANCA K
MOCH BAGU
Direktur
PELAKSANAAN
47
###
396.01
396.01
134.24
schedule yang kami buat maka kebutuhan bahan dan alat serta
295.88
591.77
schedule yang kami buat maka kebutuhan bahan dan alat serta
368.24 512.32
144.08
kami buat maka kebutuhan bahan dan alat serta pekerja dapat
57.87
115.75
II PEKERJAAN BETON
1 Beton Kolom K1 (40x40) K-250, f'c = 20,75 Mpa 6.10 0.61 1.83 2.44 1.22
2 Beton Kolom K2 (30x30) K-250, f'c = 20,75 Mpa 2.08 0.69 0.69 0.69
3 Beton Kolom KP (13x13) K-175, f'c = 20,75 Mpa 0.62 0.31 0.31
4 Beton Kolom KG (15x30) K-175, f'c = 20,75 Mpa 0.25 0.25
5 Beton Balok B1 (30/55) K-250, f'c = 20,75 Mpa 3.65 0.73 1.46 1.46
6 Beton Balok B2 (20/30) K-250, f'c = 20,75 Mpa 2.18 0.44 0.87 0.87
7 Beton Balok B3 (15/30) K-250, f'c = 20,75 Mpa 0.91 0.18 0.36 0.36
8 Beton Balok B4 (15/25) K-250, f'c = 20,75 Mpa 0.41 0.08 0.16 0.16
9 Beton Balok BG (15/30) K-250, f'c = 20,75 Mpa 0.55 0.27 0.27
10 Beton Balok RB (13/20) K-250, f'c = 20,75 Mpa 0.99 0.49 0.49
11 Beton Plat Atap tebal 10 cm K-250, f'c = 20,75 Mpa 4.10 2.05 2.05
12 Beton Plat Canopy tebal 8 cm K-250, f'c = 20,75 Mpa 1.06 0.53 0.53
V PEKERJAAN LANTAI
Bobot JANGKA WAKTU PELAKSANAAN 120 HARI
NO. URAIAN PEKERJAAN Pekerjaan BULAN 1 BULAN 2 BULAN 3 BULAN 4 120 Hari
% M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16
1 Keramik Lantai 40x40 (Motif Terang) 4.38 2.63 1.75
2 Keramik Lantai 40x40 (Motif Gelap) 1.35 0.81 0.54
3 Pas. Plint Border Keramik 10 x 40 R. Kelas 0.81 0.49 0.33
VI PEKERJAAN TANGGA
1 Pek. Beton Plat Tangga tb = 15 cm 1.45 1.45
2 Pek. Beton Anak tangga 0.57 0.57
3 Beton Balok B5 (20/40) K-250, f'c = 20,75 Mpa 0.13 0.13
4 Pas. Step Nozing 10x40 cm 0.22 0.22
5 Pas. Keramik tangga 40X40 cm 0.48 0.48
6 Pek. Dinding Railing Tangga 0.11 0.11
7 Pek. Railing Tangga Besi Pipa Putih Stainless 2 Inch 0.53 0.53
8 Pek. Acian mortar Tangga 0.09 0.09
9 Pek. Pengecatan Tangga 0.05 0.05
Total Bobot 100.00 0.77 2.53 3.14 5.60 7.99 9.07 9.40 11.07 12.39 10.56 8.52 6.15 5.59 4.87 1.33 1.03
Komulatif 0.00 0.77 3.30 6.43 12.04 20.02 29.10 38.50 49.56 61.95 72.52 81.04 87.19 92.78 97.65 98.97 100.0
SCHEDULE MATERIAL
1 Mandor
2 KepalaTukang Batu
3 KepalaTukang Besi
4 KepalaTukang Cat
5 KepalaTukang Kayu
6 KepalaTukang Listrik
7 Tukang Batu
8 Tukang Besi
9 Tukang Cat
10 Tukang Kayu
11 Tukang Pipa
12 Tukang Las
13 Tukang Listrik
14 Pembantu Tukang
SCHEDULE ALAT
1 Mobil Pick up
2 Concrete Mixer
3 Concrete Pump
4 Scaffolding
5 Mesin Potong Keramik
6 Mesin Potong Besi
7 Crane manual 5T
CHEDULE MATERIAL
Besi beton
Pasir Cor
Semen portland
Batu Pecah Mesin 1/2 cm
Kayu Meranti bekisting
Multiplek lapis film 12mm
Plywood 9mm
PEKERJAAN PIPA
Pipa PVC 4'' type AW
Roof Drain
PEKERJAAN LANTAI
Keramik Lantai Motif terang/ gelap Uk.
Stop Nosing
Semen PC (Portland Cement)
Pasir Pasang
PEKERJAAN PLAFOND
Rangka plafond
Penutup Plafond
List Gypsum
Jenis Pekerjaan Komponen Bahan
PEKERJAAN
PENGECATAN
Waterprofing
Jenis Pekerjaan Komponen Bahan
Besi Railling
SPESIFIKASI TEKNIS
Roman, Platinum
Roman, Platinum
Holcim, Gresik, Tiga roda
Lokal
1 Mobil Pick up 1 1500cc Grand max 2014 Baik Surabaya Milik Sendiri
2 Concrete Mixer 1 0.5m3 Yanmar 2010 Baik Surabaya Milik Sendiri
3 Block Chain 2 5 Ton Prohex 2015 Baik Surabaya Milik Sendiri
4 Scaffolding 50 T.170 T,170 2015 Baik Surabaya Milik Sendiri
5 Mesin Potong Keramik 1 - Makita 2013 Baik Surabaya Milik Sendiri
6 Mesin Potong Besi 1 D22 Makita 2013 Baik Surabaya Milik Sendiri
DAFTAR PERSONIL INTI
Pekerjaan Pembangunan Gedung Type B2 ((SDN SAWAHAN IV/343) )
2 Site RUDY ROSANDI, ST 3578250812700001 S1 Arsitek 8-Dec-70 SKA 1.1.101.2.148.0 17-Jan-19 17-Jan-22 10 ARSITEK - Madya
Manager 4.1110840
3 K3 M. IZUL MUTTAQIN 3578020210830002 S1 SIPIL 2-Oct-83 SKA 1,6,603,3,148,3 16-Jan-17 16-Jan-20 6 Ahli K-3 konstruksi
Konstruksi 1,1156452
4 Pelaksana WIDI AGENG PURBAYA 3515122212940004 SMK ### SKT 2,2,051,1,148,3 17-Jan-17 17-Jan-20 5 Pelaksana Bangunan Gedung
Bangunan 1,4047452
Gedung
5 Pelaksana NOVI YUNIARDI 3577031411840001 S1 ### SKT 2,1,0161,148,31 16-Jan-17 16-Jan-20 6 Pelaksana Lapangan /
Mekanikal/ ELEKTRO ,4047295 Pekerjaan Plumbing
Elektrikal
6 Estimaator AFDOL DEDELAN 3515070512890001 SMK 5-Dec-89 SKT 2,2,0471,148,31 16-Jan-17 16-Jan-20 6 Juru Hitung Kuantitas
,40304050
7 Drafter EKA NUR MEGAWATI 3578064610900004 SMK 26-Apr-10 SKT 2.1.003.1.148.3 6-Jan-17 6-Jan-20 6 Juru Gambar/Draftman - Arsitektur
1.4046985
REKAPITULASI PERHITUNGAN TKDN
TKDN
Uraian Barang Total Barang/Jasa
DN LN Gabungan %
Rp. % KDN %
I. Barang
1. Material Langsung (barang jadi) 570,515,702.19 0.00 570,515,702.19 100.00% 100.00 60.00
2. Peralatan (barang jadi) 47,542,975.18 0.00 47,542,975.18 100.00% 100.00 5.00
Kepada Yth.
Pokja Paket Pekerjaan Pembangunan Gedung Type B2 ((SDN SAWAHAN IV/343) )
Dengan ini memberi dukungan harga dengan spesifikasi sesuai dengan dokumen pengadaan kepada
Nama : MOCH BAGUS ISWANTO
Perusahaan : CV. PANCA KARYA JAYA
Alamat : Kav. Industri, Dusun Bogem RT 03 Rw 01, Desa Kebonagung, Kecamatan Sukodono, Sidoarjo