Anda di halaman 1dari 747

DAFTAR HARGA SAT

UPAH DAN BAHAN


TAHUN 2013
TRIWULAN 1
REKAPITULASI
DAFTAR HARGA SATUAN PE
TAHUN 2013
TRIWULAN 1

DAFTAR ANALISA PEK


TAHUN 2013
TRIWULAN 1
HARGA ATAS

DAFTAR ANALISA PEK


TAHUN 2013
TRIWULAN 1
HARGA BAWAH
ANALISA
HARGA BAW
ANALISA
HARGA ATA
ARGA SATUAN
AN BAHAN
UN 2013
WULAN 1
PITULASI
SATUAN PEKERJAAN
UN 2013
WULAN 1

LISA PEKERJAAN
UN 2013
WULAN 1
GA ATAS

LISA PEKERJAAN
UN 2013
WULAN 1
A BAWAH
ALISA
A BAWAH
ALISA
GA ATAS
PENENTUAN HPS PADA DINAS PU- BM CK DAN DINAS
TAHUN ANGGARAN 2013 KABUPATEN TUL

No URAIAN KEGIATAN SAT.

1 2 3
I. UPAH
1 Tukang kayu 1 Oh
2 Tukang batu 1 Oh
3 Tukang besi 1 Oh
4 Tukang cat 1 Oh
5 Kepala Tukang 1 Oh
6 Pekerja / Buruh tak terlatih 1 Oh
7 Mandor 1 Oh
8 Mekanik semi terlatih 1 Oh
9 Buruh terlatih 1 Oh
10 Buruh semi terlatih 1 Oh
11 Operator terlatih 1 Oh
12 Operator semi terlatih 1 Oh
13 Pembantu operator 1 Oh
14 Sopir 1 Oh
15 Mekanik terlatih 1 Oh
16 Pembantu Sopir 1 Oh
17 Kernet 1 Oh
18 Penjaga 1 Oh
19 Pengayam 1 Oh

II. BAHAN LOKAL


1 Air bersih Lt

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
2 Alat - alat kerja Set
3 Arang kayu Kg
4 Atap Sirap ( Kayu Ulin ) M2
5 Bak cuci traso Bh
6 Bak Mandi teraso Bh
7 Bambu dia 6 - 8 cm, panjang 6 m Btg
8 Bataco Bh
9 Batang kelapa dia 30 cm M'
10 Batu marmo warna M2
11 Batu amyang Kg
12 Batu andesit 30 x 30 cm M2
13 Batu Andesit alur M2
14 Batu Andesit Alur hitam M2
15 Batu andesit hitam bakar uk. 20 /20 (tidak dipoles ) M2
16 Batu andesit hitan uk. 30 x 30 cm ( dipoles) M2
17 Batu Andisit Hijau M2
18 Batu apung 3 - 5 cm M3
19 Batu Bata / Merah Bj
20 Batu belah, uk. 8/10 cm M3
21 Batu belah,Uk.10-15 Cm & 15 - 20 cm M3
22 Batu Bobos M2
23 Batu candi M2
24 Batu candi hitam M2
25 Batu granit black gold M2
26 Batu granit motif M2
27 Batu guary/batu besar ( uk. Crussher) M3
28 Batu koral putih M2

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
29 Batu koral warna M2
30 Batu lempeng M2
31 Batu marmo biasa M2
32 Batu paras putih M2
33 Batu paras grobongan M2
34 Batu pecah 0,5-1 cm M3
35 Batu pecah 1-2 cm M3
36 Batu pecah 2-3 cm M3
37 Batu pecah 3-5 cm M3
38 Batu pecah 5-7 cm M3
39 Batu plontos 5/7 cm M3
40 Batu putih / gunung M3
41 Batu putih pecah , 5 - 7 cm M3
42 Batu quary/batu besar ( uk. Crasher ) M3
43 Batu Salagedang M2
44 Batu susun sirih M2
45 Batu Volcano 3-5 cm M3
46 Batu warna ( hias ) Zak
47 Betek / sesek kasar M2
48 Beton Rooster Lokal abu - abu Uk. 40 x 20 cm M2
49 Beton Rooster Lokal warna 12 x 24 cm M2
50 Bilik bambu M2
51 Buis Beton 1/2 ø 20 Cm M'
52 Buis Beton 1/2 ø 30 Cm M'
53 Buis Beton 1/2 ø 40 Cm M'
54 Buis Beton ø 100 Cm M'
55 Buis Beton ø 20 Cm M'

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
56 Buis Beton ø 30 Cm M'
57 Buis Beton ø 40 Cm M'
58 Buis Beton ø 50 Cm M'
59 Buis Beton ø 60 Cm M'
60 Buis Beton ø 80 Cm M'
61 Dolken bambu panjang 3 m Btg
62 Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m Btg
63 Genteng Bubung MKP Bh
64 Genteng MKP Bh
65 Genteng Beton Bh
66 Genteng bubung beton Bh
67 Genteng gelombang Bh
68 Genteng mantili Bh
69 Genteng pres biasa Bh
70 Grasak M3
71 Ijuk Kg
72 Kapur Batu M3
73 Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting Btg
74 Kayu bakar M3
75 Kayu Balau Balok M3
76 Kayu Balau Papan M3
77 Kayu bekisting M3
78 Kayu Jati Balok eks. Bojonegoro M3
79 Kayu Jati Balok lokal M3
80 Kayu Jati Papan eks. Bojonegoro M3
81 Kayu jati papan lokal M3
82 Kayu Kamper Balok M3

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
83 Kayu Kamper papan M3
84 Kayu kelapa / glugu 8/10 cm M'
85 Kayu kelapa / glugu usuk 4/6 cm M'
86 Kayu Kempas Balok M3
87 Kayu Kempas Papan M3
88 Kayu Kruing Balok M3
89 Kayu Kruing Papan M3
90 Kayu Meranti Balok M3
91 Kayu Meranti Papan M3
92 Kayu Tahun Balok ( Mauni/ Akasia ) M3
93 Kayu Tahun papan ( Mauni/akasia) M3
94 Kerikil halus 0.4 / 0.4 (hitam ) Kg
95 Kerikil halus 0.4 / 0.4 (putih ) Kg
96 Kerikil halus 0.4 x 0.4 ( hijau) Kg
97 List Eternit ( kayu ) M'
98 Marmer bakar M2
99 Marmer Hitam M2
100 Marmer Putih M2
101 Marmer Slab lebar (1.8x2.40) m M2
102 Ornamen 30 x 30 cm Bj
103 Pasir pasang / beton M3
104 Pasir Urug M3
105 Paving Stone / conblok (10x10) 5 warna M2
106 Paving Stone / Conblok abu - abu tebal 8 cm, K225 M2
107 Paving Stone / Conblok abu - abu tebal 6 cm, K225 M2
108 Paving Stone / Conblok abu - abu tebal 6 cm, K300 M2
109 Paving Stone / Conblok abu - abu tebal 6 cm, K400 M2

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
110 Paving Stone / Conblok abu - abu tebal 8 cm, K300 M2
111 Paving Stone / Conblok abu - abu tebal 8 cm, K400 M2
112 Paving Stone / Conblok abu - abu tebal 6 cm M2
113 Paving StonE / Conblok abu - abu tebal 8 cm M2
114 Paving Stone / Conblok warna tebal 6 cm, K225 M2
115 Paving Stone / Conblok warna tebal 8 cm, K225 M2
116 Rambu lalu lintas Bh
117 Rooster/ Terawang Bh
118 Semen Merah M3
119 Sirtu royalti M3
120 Sirtu Urug M3
121 Skampal Bh
122 Susun Sirih, andisit hitam uk. 3 x 20 cm M2
123 Susun Sirih, andisit hitam uk. 3 x 30 cm M2
124 Susun Sirih, andisit hitam uk. 3 x 40 cm M2
125 Tali ijuk Kg
126 Tanah liat M3
127 Tanah urug M3
128 Ubin Abu-abu Uk. 20Cm x 20Cm M2
129 Ubin Teraso Uk 30 Cm x 30 Cm M2
130 Ubin Wafel Uk 20Cm x 20Cm M2
131 Urugan Taman M3

III. BAHAN PABRIKAN


1 Adaptor Ǿ 2" Bh
2 Adaptor Ǿ 3" Bh
3 Adaptor Ǿ 4" Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
4 Alumunium foil M2
5 Angker dia 25 mm P 50 cm Bh
6 Arde Bh
7 Asbes Gelombang Besar Uk. 300 x 105 x0,4 Cm Lbr
8 Asbes Gelombang Kecil Uk. 1.80 x 105 x0,4 Cm Lbr
9 Harga aspal untuk kontruksi
a. a. Aspal Kemas Kg
b. b. Aspal Curah Kg
10 Harga Pengadaan Aspal
a. a. Aspal Kemas Kg
b. Aspal curah Kg
13 Aquaproof Kg
14 Atap Policarbonat stainlees steel M2
15 Atap policarbonat besi M2
16 Atap Policarbonat minimalis M2
17 Atap Skylight / fiber M2
18 Avor plastik / floor drain Bh
19 Avor staninlees steel Bh
20 Awning M2
21 Baja Profil Kg
22 Baja siku Kg
23 Baja,paku-paku jembatan,besi beton Kg
24 Bak Cuci Stainlesstel (Royal) M2
25 Bak Cuci Tangan Wastafel Bh
26 Bak Kip Bh
27 Bak Mandi Fiber glass, 0.3 m3 Bh
28 Bak Mandi Fiber glass, 1.00 m x 1.00 m Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
29 Bak mandi teraso volume 0.3 m3 Bh
30 Bend All Flange 22.5 GI dia 4" Bh
31 Bend GI. Dia 2" Bh
32 Bend PVC Ǿ 1 1/2" Bh
33 Bend PVC Ǿ 1" Bh
34 Bend PVC Ǿ 2" Bh
35 Bend PVC Ǿ 3" Bh
36 Bend PVC Ǿ 4" Bh
37 Bensin Non Subsidi pemerintah Ltr
38 Bensin Subsidi pemerintah Ltr
39 Besi Beton / tulangan beton Kg
40 Besi Beugel/Baut Kg
41 Besi pengaman pipa dia 12 mm Unit
42 Besi plat Kg
43 Biaya Penyambungan dan Uji PLN Titik
44 Boull Valve Bh
45 Box Meter Bh
46 BPU VA
47 Bubung asbes gel besar ( Ardek 1Stel 2 Lmbr ) Stel
48 Bubung asbes gel kecil ( Ardek 1Stel 2 Lmbr ) Stel
49 Calsy bord ( uk. 122 x x 244 x 0.3 cm Lbr
50 Cassing Pompa PVC dia 10" S 10 Bh
51 Cat besi Kg
52 Cat genteng Kg
53 Cat term Kg
54 Cat Dasar wheathershield Kg
55 Cat Kayu Emco Kg

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
56 Cat Meny besi Kg
57 Cat Meny kayu Kg
58 Cat Tembok Kg
59 Cat Tembok exterior wheathershield Kg
60 Cat Tembok interior premium Kg
61 Chek Valve Ǿ 2 1/2" Bh
62 Chek Valve Ǿ 3" Bh
63 Chek Valve Ǿ 4" Bh
64 Chek Valve Ǿ 6" Bh
65 Chek Valve Ǿ 8" Bh
66 Clamp penggantung lengkap Unit
67 Clear melamin impra dof / gloos Kg
68 Coatting Ltr
69 Daun jendela kaca aluminium 4" M2
70 Daun Jendela kaca aluminium YKK M3
71 Daun pintu Kaca pegas lengkap (kunci,engsel dan handle) Bh
72 Deap and assamble Bh
73 Dempul Kayu Kg
74 Dobel Nepel Ǿ 1/2" Bh
75 Doble Niple Ǿ 3" Bh
76 Dop GI dia 1" Bh
77 Dop GI dia 1.5" Bh
78 Dop GI dia 2" Bh
79 Dop GI dia 2.5" Bh
80 Dop GI dia 3" Bh
81 Dop GI dia 4" Bh
82 Dop PVC dia 1" Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
83 Dop PVC dia 1.5" Bh
84 Dop PVC dia 2" Bh
85 Dop PVC dia 2.5" Bh
86 Dop PVC dia 3" Bh
87 Dop PVC dia 4" Bh
88 Double Kran Dupon Bh
89 Elektroda Kg
90 Engsel pintu kupu - kupu Bh
91 Engsel Jendela ( H ) Bh
92 Engsel Jendela (Arch ) Bh
93 Engsel Pintu ( H ) Bh
94 Engsel Pintu (Arch ) nylon Bh
95 Engsel sendok Bh
96 Engsel Stainlesstel Dekson 3" Bh
97 Engsel Stainlesstel Dekson 4" Bh
98 Engsel Stainlesstel Dekson 5" Bh
99 Eternit kembang M2
100 Eternit polos (Asbes) M2
101 Exhaust dinding Unit
102 Exhaust langit-langit 20/20 cm Unit
103 Exhaust langit-langit 25/25 cm Unit
104 Flange Las Dia 4" Bh
105 Flange Las Dia 8" Bh
106 Flange Las Dia Ǿ 3" Bh
107 Flange Las Dia Ǿ 6" Bh
108 Flange Socket dia 2" Bh
109 Flange Socket Ǿ 3" Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
110 Flange Socket Ǿ 4" Bh
111 Formika Lbr
112 Gate Valve GI Ǿ 2" Bh
113 Gate Valve GI Ǿ 3" Bh
114 Gate Valve GI Ǿ 4" Bh
115 Gate Valve GI Ǿ 6" Bh
116 Gate Valve GI Ǿ 8" Bh
117 Genteng bubung beton Bh
118 Genteng Kaca Bh
119 Genteng Metal Lbr
120 GIP BSA diameter 1" M'/ psg
121 GIP BSA diameter 1,25" M'/ psg
122 GIP BSA diameter 2" M'/ psg
123 GIP BSA diameter 2,5" M'/ psg
124 GIP BSA diameter 3" M'/ psg
125 GIP BSA diameter 4" M'/ psg
126 GIP BSA diameter 1,5" M'/ psg
127 GIP BSA diameter 1/2" M'/ psg
128 GIP BSA diameter 3/4" M'/ psg
129 Glass bird Kg
130 Glass block Bj
131 Granit (ex Granito) tekstur Uk. 40x40 cm M2
132 Granit (ex Granito) tekstur Uk. 60x60 cm M2
133 Granit (ex Granito) warna gelap Uk. 40x40 cm M2
134 Granit (ex Granito) warna gelap Uk. 60x60 cm M2
135 Granit (ex Granito) warna terang Uk. 40x40 cm M2
136 Granit (ex Granito) warna terang Uk. 60x60 cm M2

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
137 Grendel jendela merk SES Bh
138 Grendel Pintu Panjang ( sespen ) Bh
139 Grendel pintu ganda Dekson 40 cm komplit Bh
140 Grendel tanam merk SES Set
141 Grill besi M2
142 Gypsum board ( 1,2 x 2,4 m ) Lbr
143 Hak Angin Set
144 Hak angin Merk SES Set
145 Handle Bh
146 Handle pintu ganda Dekson 30 cm komplit Set
147 Handle pintu ganda Dekson 40 cm komplit Set
148 Handle pintu stanless steel besar Psg
149 Handle pintu stanless steel kecil Bh
150 Harpleks ( Uk 40 .200. 04 ) Lbr
151 HCL / air keras Ltr
152 Kabel cocial M'
153 Kaca air 5 Cm M2
154 Kaca bluegreen t=8mm M2
155 Kaca patry M2
156 Kaca Bening Uk. 3 mm M2
157 Kaca Bening Uk. 5 mm M2
158 Kaca Bening Uk. 7 mm M2
159 Kaca Ray-band Uk. 5 mm M2
160 Kaca Ray-band Uk. 7 mm M2
161 Kaca Stained Glass M2
162 Kanstin (K225) uk. 40x20x10 cm M'
163 Kanstin (K225) uk. 40x20x15 cm M'

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
164 Karung plastik Bh
165 Kawat ayaman bronjong galvanis Kg
166 Kawat Beton / bendraat Kg
167 Kawat Duri M'
168 Kawat Harmonika M2
169 Kawat Nyamuk aluminium M2
170 Keni Drat Ǿ 1/2" Bh
171 Keni GI Ǿ 1/2" Bh
172 Keramik Arstistik Uk. 10 x 20 cm M'
173 Keramik cutting Uk. 30cm x 50 cm M2
174 Keramik cutting Uk. 31cm x 63 cm M2
175 Keramik dinding motif Uk. 20cm x 25 cm M2
176 Keramik dinding putih ukuran 20/25 Cm M2
177 Keramik dinding Uk. 20cm x 33 cm M2
178 Keramik motif Uk. 30 cm x 30 cm M2
179 Keramik motif Uk. 40 cm x 40 cm M2
180 Keramik motif Uk. 50 cm x 50 cm M2
181 Keramik putih Uk. 30 cm x 30 cm M2
182 Keramik putih Uk. 40cm x 40 cm M2
183 Keramik tekstur cutting Uk. 31cm x 63 cm M2
184 Keramik tekstur Uk. 20cm x 20 cm M2
185 Keramik tekstur Uk. 30cm x 30 cm M2
186 Keramik Uk. 20Cm x 20Cm M2
187 Kertas gosok ( rempelas ) Lbr
188 Kipas Angin langit-langit Unit
189 Kisi - kisi almunium M2
190 Kisi - kisi almunium 4" M'

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
191 Kisi-kisi aluminium 3" M'
192 Klem Sadel 2" Bh
193 Klem Sadel 3" Bh
194 Klem Sadel 4" Bh
195 Kloset Duduk Keramik Bh
196 Kloset Duduk Keramik (komplit) Bh
197 Kloset Jongkok Keramik Bh
198 Kloset Jongkok teraso Bh
199 Kloset Monoblok Lokal Bh
200 Knee Drat PVC Ǿ 3/4" Bh
201 Knee GI dia 3" Bh
202 Knee GI dia 4" Bh
203 Knee GI Ǿ 2,5" Bh
204 Knee PVC Ǿ 3" Bh
205 Knee PVC Ǿ 3/4" Bh
206 Knee PVC Ǿ 4" Bh
207 Kompor Gas Bh
208 Kran cucian dia 3/4" Bh
209 Kran Dia 1/2 " Bh
210 Kran Dia 3/4 " Bh
211 Kran Dupon Bh
212 Kran Toto 1/2" Bh
213 Kuas Eterna 4 " Bj
214 Kunci tanam merk SES ( pelor ) Bh
215 Large angle Bh
216 Lem ( Kayu + Tembok ) Kg
217 Lem PVC Kg

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
218 List Profil besar ( gypsum ) M'
219 List Profil kecil ( gypsum ) M'
220 Man hole (tutup plat besi 0.5 x 0.5) Unit
221 Manometer Bh
222 Manometer Kecil Bh
223 Mesin Diesel 5 HP / 2200 RPM Bh
224 Minyak bekisting Ltr
225 Minyak Cat / Thiner A Ltr
226 Minyak Cat / Thiner B Ltr
227 Minyak Pelumas Ltr
228 Minyak Tanah Ltr
229 Minyak tanah industri Ltr
230 Multiplek 6 mm, uk 1,20 x 2,40 m Lbr
231 Multiplek 9 mm, uk. 1,20 x 2,40 m Lbr
232 Mur, Baut baja dia 3/4" panjang 10 cm Bh
233 Mur, Baut biasa dia 3/4" panjang 10 cm Bh
234 Naco (Kerangka dan Daun ) M2
235 Nok atap genteng metal Lbr
236 Oli Gardan Ltr
237 Pagar Besi BRC Pabrikasi ( Besi Ø6"- Ø8" Uk.120 x 240 )cm M2
238 Pagar Besi BRC Pabrikasi ( Besi Ø6"- Ø8" Uk.150 x 240 )cm M2
239 Pagar Besi BRC Pabrikasi ( Besi Ø6" - Ø8" Uk. 90 x 240 )cm M2
240 Pagar pipa besi holo (20.20.1)mm,Rangka besi holo (50.50.2)mM2/Psg
241 Pagar pipa besi holo (20.20.2)mm,Rangka besi holo (50.50.2)mM2/Psg
242 Paku biasa Kg
243 Paku Gypsum Kg
244 Paku Asbes Kg

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
245 Paku beton Bj
246 Paku Kait ( pancing ) Bh
247 Paku Sekrup Bh
248 Paku Seng ( Paku payung ) Kg
249 Paku Sumbat Bh
250 Panel CU 3 Bh
251 Panel kontrol 1WLC DOL 1,6 kw 1x220 V 50 Hz Unit
252 Panel kontrol 2WLC DOL 1,5 kw 3x380 V 50 Hz Unit
253 Panel kontrol 2WLC DOL 2,2 kw 3x380 V 50 Hz Unit
254 Panel kontrol 2WLC DOL 3,2 kw 1x220 V 50 Hz Unit
255 Panel kontrol 2WLC DOL 4 kw 3x380 V 50 Hz Unit
256 Panel kontrol 2WLC DOL 5,5 kw 3x380 V 50 Hz Unit
257 Panel kontrol 2WLC DOL 7,5 kw 3x380 V 50 Hz Unit
258 Partikel board t = 18 mm (1.22 m x 2.42 m ) Lbr
259 Pas. Huruf logo nama stainlees uk. 20 - 30 cm Bh
260 Pas. Huruf logo nama stainlees uk. 30 - 40 cm Bh
261 Pas. Huruf logo nama stainlees uk. 40 - 50 cm Bh
262 Pas. Pagar Besi Tuang Ø14" M2/Psg
263 Pas. Pagar Besi Tuang Ø16" M2/Psg
264 Pas. Pintu Pagar Besi Tuang Ø14" (komplit) M2/Psg
265 Pas. Pintu Pagar Besi Tuang Ø16" (komplit) M2/Psg
266 Pasang tiang listrik cor beton Titik
267 PC / Portland cement Kg
268 Piercing conector Bh
269 Pintu aluminium coklat / hitam 4" M2
270 Pintu besi baja M2
271 Pintu besi lipat ( Bukan Harmonika) M2

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
272 Pintu besi lipat ( harmonika) M2
273 Pintu kaca sliding Bh
274 Pintu Pagar besi holo (20.20.2)mm, Rangka besi holo (50.50.2 M2/Psg
275 Pintu Pagar pipa besi holo (20.20.1)mm, Rangka besi holo (50 M2/Psg
276 Pintu PVC Polos Bh
277 Pipa Besi  2/4 Tebal= 1.2 mm M'
278 Pipa Besi  2/4 Tebal= 1.4 mm M'
279 Pipa Besi  4/4 Tebal= 1.2 mm M'
280 Pipa Besi  4/4 Tebal= 1.4 mm M'
281 Pipa Galvanis Ø 1" Tebal 0.8 mm M'
282 Pipa Galvanis Ø1.5" Tebal 0.8 mm M'
283 Pipa Galvanis Ø2" Tebal 0.8 mm M'
284 Pipa Galvanis Ø2.5" Tebal 0.8 mm M'
285 Pipa Galvanis Ø3" Tebal 0.8 mm M'
286 Pipa Galvanis Ø4" Tebal 0.8 mm M'
287 Pipa GI BSA Med. Biru diameter 0,5" M' / bhn
288 Pipa GI BSA Med. Biru diameter 1" M' / bhn
289 Pipa GI BSA Med. Biru diameter 1,5" M' / bhn
290 Pipa GI BSA Med. Biru diameter 2" M' / bhn
291 Pipa GI BSA Med. Biru diameter 2,5" M' / bhn
292 Pipa GI BSA Med. Biru diameter 3" M' / bhn
293 Pipa GI BSA Med. Biru diameter 3/4" M' / bhn
294 Pipa GI BSA Med. Biru diameter 4" M' / bhn
295 Pipa GI BSA Med. Merah diameter 1" M' / bhn
296 Pipa GI BSA Med. Merah diameter 2" M' / bhn
297 Pipa GI BSA Med. Merah diameter 2,5" M' / bhn
298 Pipa GI BSA Med. Merah diameter 3" M' / bhn

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
299 Pipa GI BSA Med. Merah diameter 4" M' / bhn
300 Pipa kurasan plastik Bh
301 Pipa SDR 21 Diameter 4" (Pipa PE) M' / bhn
302 Pipa SDR 21 Diameter 6" (Pipa PE) M' / bhn
303 Plamur kayu Kg
304 Plamur Tembok Kg
305 Playwood ( 120 x 240 ) cm, tbl. 4 mm Lbr
306 Politur jadi Ltr
307 Pompa air Alcon Dia 3" (setara Honda WB 30 XT) Unit
308 Pompa air listrik 40 lt/menit 125 watt Bh
309 Pompa GRUNDFOS, Type CM 10-3 Unit
310 Pompa GRUNDFOS, Type CR 10-12 Unit
311 Pompa GRUNDFOS, Type CR 10-16 Unit
312 Pompa GRUNDFOS, Type CR 10-22 Unit
313 Pompa GRUNDFOS, Type CR 5-16 Unit
314 Pompa GRUNDFOS, Type SP 5A-17 Unit
315 Pompa JP Basic 5 Unit
316 Pompa Sub Mersible Sp. 17.37 Unit
317 Pompa Tangan Bh
318 Profil daun pintu almunium coklat / hitam Bh
319 Profil kusen almunium coklat / hitam 4" M'
320 Profil kusen aluminium 4" M'
321 Profil kusen aluminium 4"ykk M2
322 PVC AW Dia 1 " M' / bhn
323 PVC AW Dia 1/2 " M' / bhn
324 PVC AW Dia 10 " M' / bhn
325 PVC AW Dia 12 " M' / bhn

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
326 PVC AW Dia 14 " M' / bhn
327 PVC AW Dia 16 " M' / bhn
328 PVC AW Dia 2 " M' / bhn
329 PVC AW Dia 2 ,5" M' / bhn
330 PVC AW Dia 3 " M' / bhn
331 PVC AW Dia 3/4 " M' / bhn
332 PVC AW Dia 4 " M' / bhn
333 PVC AW Dia 5 " M' / bhn
334 PVC AW Dia 6 " M' / bhn
335 PVC AW Dia 8 " M' / bhn
336 PVC (Class D) Dia 1.25 " M' / bhn
337 PVC (Class D) Dia 10 " M' / bhn
338 PVC (Class D) Dia 12 " M' / bhn
339 PVC (Class D) Dia 14 " M' / bhn
340 PVC (Class D) Dia 16 " M' / bhn
341 PVC (Class D) Dia 2 " M' / bhn
342 PVC (Class D) Dia 2.5 " M' / bhn
343 PVC (Class D) Dia 3 " M' / bhn
344 PVC (Class D) Dia 4 " M' / bhn
345 PVC (Class D) Dia 5 " M' / bhn
346 PVC (Class D) Dia 6 " M' / bhn
347 PVC (Class D) Dia 8 " M' / bhn
348 PVC. AW Dia 2.5" M' / bhn
349 PVC. Diameter 2" (S 12,5) M'/psg
350 PVC. Diameter 2" (S 12,5) M' / bhn
351 PVC. Diameter 2,5" (S 12,5) M'/psg
352 PVC. Diameter 2,5" (S 12,5) M' / bhn

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
353 PVC. Diameter 3" (S 12,5) M'/psg
354 PVC. Diameter 3" (S 12,5) M' / bhn
355 PVC. Diameter 4" (S 12,5) M'/psg
356 PVC. Diameter 4" (S 12,5) M' / bhn
357 PVC. Diameter 6" (S 12,5) M'/psg
358 PVC. Diameter 6" (S 12,5) M' / bhn
359 PVC. Diameter 8" (S 12,5) M'/psg
360 PVC. Diameter 8" (S 12,5) M' / bhn
361 Ralling tangga / tangga stainlees M2
362 Ralling tangga / pagar besi M2
363 Rangka plafond metal furing M'
364 Reducer Ǿ 3 - Ǿ 2 Unit
365 Reducer Ǿ 4 - Ǿ 3 Unit
366 Reducer PVC Ø 3" - 2" Bh
367 Reducer PVC Ø 4" - 3" Bh
368 Rel pintu dorong Unit
369 Reservoir fiber kapasitas 1.100 Ltr (Profil Tank) Bh
370 Reservoir fiber kapasitas 800 Ltr (Profil Tank) Bh
371 Residu ( Ter ) Ltr
372 Rol baja dia 19 mm lengkap Unit
373 Roling Door aluminium M2
374 Screen dia 2" Bh
375 Screen dia 3" Bh
376 Screen dia 4" Bh
377 Seal Tape Rol
378 Sealant Tube
379 Selot ( kunci pintu ) merk SES Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
380 Selot Rossete Dekson Bh
381 Semen Putih / warna Kg
382 Sending impra ( melamine) Kg
383 Seng Gelombang Bjls 20 uk. 180 x 90 x 0,02 cm Lbr
384 Seng gelombang BJLS 20 uk. 305 x 90 x 0,02 cm Lbr
385 Seng Gelombang Bjls 30 uk 180 x 90 x 0,03Cm Lbr
386 Seng gelombang BJLS 30 uk.305 x 90 x 0,03 Cm Lbr
387 Seng Plat BJLS 20 lebar 0,90 m M'
388 Seng Plat BJLS 30 lebar 0,90 m M'
389 Shower Dupon Bh
390 Skrup Fixer Bh
391 Slot ( Kunci-kunci pintu ) lokal Bh
392 Sock GI Ǿ 2" Bh
393 Sock GI Ǿ 2" Bh
394 Sock GI Ǿ 3" Bh
395 Sock GI Ǿ 3" Bh
396 Sock GI Ǿ 4" Bh
397 Sock GI Ǿ 4" Bh
398 Sock PVC Ǿ 3" Bh
399 Soda api Kg
400 Sok Drat Luar Ǿ 1/2" Bh
401 Sok Drat PVC Ǿ 3/4 - 1/2" Bh
402 Sok GI Ǿ 1/2" Bh
403 Solar Ltr
404 Solar industri Ltr
405 Spanmur Bh
406 Start Port Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
407 Stempet / Gemuk Kg
408 Stop Kran Dia 1 " Bh
409 Stop Kran Dia 1/2 " Bh
410 Stop Kran Dia 3/4 " Bh
411 Stop kran dia 1" kuningan Bh
412 Stop kran dia 1" plastik Bh
413 Stop kran dia 1/2" kuningan Bh
414 Stop kran dia 3/4" kuningan Bh
415 Stop Kran Ǿ 1/2" Bh
416 Talang PVC U 4" M'
417 Tandon air stainlees steel kap. 1.000 ltr Bh
418 Tandon air stainlees steel kap. 550 ltr Bh
419 Tangga Pipa GI Ǿ 1" Unit
420 TC (Twisted Cable) : 3 x 70 + 1 x 50 Bh
421 Teak oil Ltr
422 Teakwood ( 122 X 242 ) Cm Lbr
423 Tee PVC dia 2"x dia 1" Bh
424 Tee PVC dia 3"x dia 2 1/2" Bh
425 Tee PVC Ǿ 2" x Ǿ1 1/ 2" Bh
426 Tee PVC Ǿ 2" x Ǿ 1/ 2" Bh
427 Tee PVC Ǿ 2" x Ǿ 2" Bh
428 Tee PVC Ǿ 3" Bh
429 Tee PVC Ǿ 3" x Ǿ 2" Bh
430 Tee PVC Ǿ 3" x Ǿ 3" Bh
431 Tee PVC Ǿ 3/4" Bh
432 Tee PVC Ǿ 4" Bh
433 Tee PVC Ǿ 4" x Ǿ 3" Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
434 Tee PVC Ǿ 4" x Ǿ 4" Bh
435 Tegel alur 20/20 cm Bh
436 Tegel badak merah 20/20 cm Bh
437 Tekwood dilapis aluminium Lbr
438 Tempat Sabun Bh
439 Teralis Besi M2
440 Tralis stainlees M2
441 Travo Unit
442 Trek Schok Bh
443 Treker dia 12 mm Unit
444 Tripleks tebal 4 mm ( 1.20 x 2.40 ) m Lbr
445 Tripleks tebal 3 mm ( 0.90 x 2.40 ) m Lbr
446 Tripleks tebal 4 mm ( 0.90 x 2.00 ) m Lbr
447 Tripleks tebal 4 mm ( 1.10 x 2.10 ) m Lbr
448 Tripleks tebal 4 mm ( 1.22 x 2.44 ) m Lbr
449 Tutup Besi Baja Manhole Diameter 50 cm tebal=1 cm Unit
450 Urinoir Bh
451 Vent GI Ǿ 2" Bh
452 Vent GI Ǿ 3" Unit
453 Vent GI Ǿ 4" Bh
454 Vernis Ltr
455 Wall Pipe Seal Bh
456 Wash Out GI. Dia 3" Unit
457 Water Meter Ǿ 1/2" Bh
458 Water prooffing Kg
459 Wiremesh M7 Uk. (2,1x5.4) m Kg
460 Wood filler impra ( dempul jati ) Kg

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
461 Wood stain impra ( Pewarna melamine) Kg

BIAYA TES PROYEK JALAN DAN JEMBATAN


1 Tes Beton paket
2 Tes daya dukung tanah/CBR ttk/km
3 Tes kedalaman tanah keras/sondir ttk/km
4 Tes Lapen ttk
5 Tes Telford ttk

BIAYA KEGIATAN LAIN-LAIN


1 Merakit asesoris jembatan plong
2 Papan nama unit
3 Papan nama batu marmer (uk. 50x80) cm unit
4 Pelaporan paket
5 Pembersihan telford lama m2
6 Pengeboran untuk pompa tangan m1
7 Sewa direksi keet bulan
8 Sewa kantor konsultan bulan

ALAT-ALAT PERSAMPAHAN
1 Alat pencacah Sampah organik bh
2 Alat pengayak kompos bh
3 Bin Container 3R bh
4 Gerobak sampah 3R bh
5 Gerobak Sampah PKL bh
6 Kotak fermentasi bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
IV. PERTAMANAN
TANAMAN PENUTUP TANAH
1 Rumput Embun Lempengan M2
2 Rumput Golf M2
3 Rumput jepang M2
4 Rumput Lumut Serpen Lempengan M2
5 Rumput Manial Lempengan M2
6 Rumput Manila Tandus M2
7 Rumput Mutiara M2
8 Rumput Paitan Lempengan M2
9 Rumput Paitan Tandus M2
10 Rumput Putih M2
11 Rumput sawah M2
12 Rumput Swiss M2

TANAMAN PENUTUP TANAH BERGUNA


1 Balsemanea Pot
2 Bayam Merah (tinggi= 0.5 m) Polibag
3 Bludru Coklat Pot
4 Bludru Hijau Pot
5 Cendrawasih Pot
6 Cengger Ayam Air Mancur Besar Pot
7 Cengger Ayam Air Mancur Kecil Pot
8 Cengger Ayam Pot Rol Besar Pot
9 Cengger Ayam Pot Rol Kecil Pot
10 Cocor Bebek Pot
11 Dinding Ari Pot

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
12 Kembang Coklat Pot
13 Krokot Pot
14 Kucai Polibag
15 Lili Paris Bintang Pot
16 Lili Paris Kasar Pot
17 Lili Paris Kucai Pot
18 Lili Paris Umbi Pot
19 Meotan Pot
20 Mirten Perak Pot
21 Mirten Rebah Pot
22 Nanas Kerang Pot
23 Nanas Merah Pot
24 Pakis Gunung Pot
25 Pakis Kelabang Pot
26 Pakis Krol Batang
27 Pakis Moos Pot
28 Pakis Perak Pot
29 Pangkas Kuning Pot
30 Seruni Pot
31 Sugi Putih Pot
32 Sutra Bombay Banci Pot
33 Sutra Bombay Ungu Pot
34 Tagete FT Pot
35 Verdana Pot

TANAMAN DALAM RUANG


1 Anggrek Bulan Pot

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
2 Anggrek Dangless Pot
3 Anggrek Dekorobium Pot
4 Anthurium Uk. 30 - 60 cm Pot
5 Anthurium Uk. 60 - 80 cm Pot
6 Anthurium Uk. 80-100 cm Pot
7 Apel Blossom Pot
8 Asparagus Panjat Pot
9 Balanceng Bintik Pot
10 Balanceng Putih Pot
11 Begonia Daun Besar Pot
12 Begonia Kecil Pot
13 Begonia Perak Pot
14 Beras Tumpah Pot
15 Golden Shower Pot
16 Hortensia Pot
17 Kencuran Pot
18 Krisdoren Pot
19 Kuping Gajah Pot
20 Kuping Keledai Pot
21 Maustera Pot
22 Meranti Pot
23 Meranti Bentur Pot
24 Meranti Bintik Pot
25 Meranti Mas Koki Pot
26 Meranti Pisang Pot
27 Miana Bangkok Pot
28 Miana Daun Besar Pot

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
29 Miana Daun Kecil Pot
30 Miana Mangkok Pot
31 Mutiara Pot
32 Pacing Pot
33 Peplan Putih Pot
34 Sabrina Ungu Pot
35 Simbar Menjangan Pot
36 Sinterklas Ungu Pot
37 Sri Rejeki Pot
38 Suplir Foster Pot
39 Suplir Halus Pot
40 Tanduk Rusa Pot
41 Wali Songo Pot

TANAMAN PERDU SEMAK


1 Agave Kodok Pot
2 Agave Strip Pot
3 Aglonema Pohon
4 Akalipa Kerdil Pot
5 Andong merah Pohon
6 Andong merah (tinggi= 0.5 m) Polibag
7 Anggrek Tanah Pohon
8 Anjuang Hijau Pot
9 Anjuang Kribo Pot
10 Anjuang Kuning Pot
11 Anjuang Medan Pot
12 Anjuang Suji Pot

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
13 Aralea Polibek
14 Bendron Pohon
15 Billawan Pot
16 Bougenville Berbunga Penuh Pohon
17 Bougenville Berbunga Penuh (tinggi= 0.5 m) Polibag
18 Bougenville Besar Pot
19 Bougenville Hawai Pot
20 Bougenville Kecil Pot
21 Bungur Jepang Pot
22 Culam Pot
23 Daun pandan wangi Glangsing
24 Delauder Pohon
25 Dieven Bachia Pohon
26 Drasaena Pohon
27 Golden Cauddle Pohon
28 Hujan Mas Pohon
29 Kaca Piring Pohon
30 Kaktus Centong Pohon
31 Kaktus Tiang Pentung Pohon
32 Kamboja Banci Pohon
33 Kamboja Jepang Pohon
34 Kamboja Merah Hati 1 - 1,5 m Pohon
35 Kamboja Merah Hati 2 - 2,5 m Pohon
36 Kamboja Pantai Pohon
37 Kamboja Putih Pohon
38 Kana Biasa (tinggi= 0.5 m) Polibag
39 Kana Jepang Pot

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
40 Kastuba Pohon
41 Kembang Sepatu (tinggi= 0.5 m) Polibag
42 Kembang Sepatu Putih Pohon
43 Kenanga Pohon
44 Kol Ganda Pohon
45 Korombusa Hijau Polibag
46 Korombusa Putih Besar Polibag
47 Korombusa Putih Kecil Polibag
48 Krisan Polibag
49 Lantana Pagar Pohon
50 Lavender Polibag
51 Lidah mertua (tinggi= 0.5 m) Polibag
52 Lusiana Tinggi Pohon
53 Lusiana Tinggi 1 m Pohon
54 Lusiana Tinggi 2 m Pohon
55 Mawar / Dendros Pohon
56 Mawar / Rose Hybrida Pohon
57 Mawar Jambe (tinggi= 0.5 m) Polibag
58 Melati Cina (tinggi= 0.5 m) Polibag
59 Melati Costa Pohon
60 Melati Gambir Pohon
61 Nusa Indah (tinggi= 0.5 m) Polibag
62 Nusa Indah Putih Pohon
63 Palem Udang Pohon
64 Panca warna Polibag
65 Pandan Belgi (tinggi= 0.5 m) Polibag
66 Pandan Suci (tinggi= 0.5 m) Polibag

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
67 Pepayungan Pohon
68 Pisang Pohon
69 Pohon Pangkas (tinggi = 0,5 m) Pohon
70 Pohon Pangkas (tinggi = 1 m) Pohon
71 Pucuk Merah (tinggi= 1 m) Polibag
72 Pucuk Merah (tinggi= 2 m) Polibag
73 Puring Banci Pohon
74 Puring Bangkok (tinggi= 0.5 m) Polibag
75 Puring Bor Pohon
76 Puring Buntut Ayam Pohon
77 Puring Gelatik Pohon
78 Puring Jet (tinggi= 0.5 m) Polibag
79 Puring Ketapang Pohon
80 Puring Lancur Polibag
81 Puring Nuri Pohon
82 Rosalia (tinggi= 0.5 m) Polibag
83 Rosindah Pohon
84 Sablo Pohon
85 Sambang Darah Besar Polibag
86 Sambang Darah Sedang Polibag
87 Schefflera Arboricol Pohon
88 Siklok Polibag
89 Soka Bangkok Pohon
90 Soka Jepang Pohon
91 Soka Philipina Pohon
92 Soka Singapura Pohon
93 Soka Srantan Pohon

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
94 Spider Leli (tinggi= 0.5 m) Polibag
95 Terang Bulan Pohon
96 Tombak Raja Pohon
97 Tri colour Polibag

TANAMAN MERAMBAT
1 Air Mata Pengantin Pot
2 Alamanda Pot
3 Arabida Pot
4 Cineanan Pot
5 Flame Of Irian Pot
6 Ipomonea Pot
7 Jasutinus Rambat Pot
8 Kongea Pot
9 Lantana Rambut Pot
10 Lee Kuan Yew Pot
11 Mandivila Pot
12 Philipina Jade Pot
13 Sirih Gading Pot
14 Stepanut Pot
15 Stepanut Ungu Pot
16 Sungsang Pot

TANAMAN EKSOTIS ( A )
1 Agave (tinggi= 0.5 m) Polibag
2 Agave Putih Pohon
3 Amisilis Pohon

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
5 Bakung Pohon
6 Cemara Norfolk Pohon
7 Tiris (tinggi= 0.5 m) Polibag

TANAMAN EKSOTIS ( B )
1 Beringin Bonsai Pohon
2 Beringin Bonsai Bentukan Pohon
3 Bonsai Serut Pohon
4 Bonsai Sianton Pohon
5 Cemara Norfolk Pohon
6 Cemara Pipa Mas Pohon
7 Hebbra Pohon
8 Jambu Bangkok Pohon
9 Jeruk Lingkit Pohon
10 Jeruk Sunkist Pohon
11 Pakis Monyet Pohon
12 Palem Putri Pot
13 Palem Ratu Pohon
14 Palem Regu Pot
15 Pinang Merah Pohon
16 Pisang Kipas Pohon
17 Sikat Halus Pohon
18 Sikat Kasar Pohon
19 Sikat Medan Pohon

TANAMAN BORDER
1 Anjuang Kribo, Srikit, Pakis, Gonongkes I Teduh M2

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
2 Balanceng Marandra, Dinding Klas II Teduh M2
3 Nusa Indah, Kelabang, Krokot Klas II Panas M2
4 Puring-puring Gelatik, Pakis Rol Klas I Panas M2

TANAMAN POHON PELINDUNG


1 Akasia Pohon
2 Angsana Ø20 cm tinggi= 3 m Pohon
3 Asem Pohon
4 Asem Kranji Pohon
5 Asem Landi Putih Pohon
6 Beringin 1,5 - 2 m Pohon
7 Beringin 10 - 30 cm Pohon
8 Bintaro 1,5 - 2 m Pohon
9 Biola Cantik Pohon
10 Bunga Sapu Tangan Pohon
11 Bungur Pohon
12 Casia Glanca Pohon
13 Casia Lampion Pohon
14 Cemara Nurelik 10 - 25 cm Pohon
15 Cempaka Pohon
16 Dadap Kuning 8 - 20 cm Pohon
17 Dadap Merah 1,5 - 2 m Pohon
18 Dadap Merah 8 - 20 cm Pohon
19 Damar Pohon
20 Dipsul Pohon
21 Flamboyan Pohon
22 Glodongan Pohon

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
23 Glodongan 3 M Pohon
24 Glodongan 4 M Pohon
26 Glodongan Tiang Tinggi Pohon
27 Jagaranda Pohon
28 Jetrofa Ø20 cm tinggi= 2.5 m Pohon
29 Johar Pohon
30 Kamboja Rantai 8 - 20 cm Pohon
31 Kay Pohon
32 Kayu Manis Pohon
33 Kayu Manis 10 - 25 cm Pohon
34 Kayu Putih Pohon
35 Kembang kupu - kupu 1,5 2 m Pohon
36 Kembang kupu - kupu 10 - 20 cm Pohon
37 Kembang Merak Pohon
38 Kembang Sepatu 8 - 20 cm Pohon
39 Kenari Ø10 cm tinggi= 2 m Pohon
40 Ketapang Pohon
41 Kiara Payung Pohon
42 Kobanda 10 - 20 cm Pohon
43 Kupu-kupu Ø15 cm tinggi= 2.5 m Pohon
44 Mahoni Pohon
45 Matua Ø30 cm tinggi=3 m Pohon
46 Mindi Pohon
47 Nam-Naman 30 cm Pohon
48 Pule 10 - 25 cm Pohon
49 Sawo Duren Pohon
50 Sepatu Dia 1,5 - 2 m Pohon

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
51 Sono Keling Pohon
52 Spathodeta Pohon
53 Tabir Buya 1,5 - 2 m Pohon
54 Tanjung Pohon
55 Trembesi Ø30 cm tinggi= 3 m Pohon
56 Yanglu Pohon

TANAMAN JENIS PALEM


1 Kelapa Sawit Pohon
2 Palem Anggur Pohon
3 Palem Botol Pohon
4 Palem Jepang Pohon
5 Palem Kol Pohon
6 Palem Kuning Pohon
7 Palem Kuning Pohon
8 Palem Merah Pohon
9 Palem Phoenix Pohon
10 Palem Raja Pohon
11 Palem Raja 150 - 200 cm Pohon
12 Palem Raja 65 - 100 cm Pohon
13 Palem Saderi Pohon
14 Palem Sading Pohon
15 Palem Weregu Pohon
16 Pinang Sirih Pohon
17 Wali Songo 0,5 - 1 m Pohon

TANAMAN BAMBU CEMARA

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
1 Bambu Daging Pohon
2 Bambu Jepang Pohon
3 Bambu Kuning Pohon
4 Cemara Angin Pohon
5 Cemara Gembel Pohon
6 Cemara Halus Pohon
7 Cemara Natal Pohon
8 Pinus Pohon

BUNGA POTONGAN
1 Amarilis Tangkai
2 Anggrek Macan Tangkai
3 Anyelir Tangkai
4 Apel Blossom Tangkai
5 Aster Tangkai
6 Bunga Rangkaian Buket
7 Denrobium Tangkai
8 Douglas Tangkai
9 Fortulaka Tangkai
10 Gladiol Tangkai
11 Golden Shower Tangkai
12 Krisan Tangkai
13 Mawar Tangkai

ALAT PEMBERSIH PERTAMANAN


1 Cangkul Bh
2 Cetok Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
3 Cikrak seng Bh
4 Cintung riol Bh
5 Gagang cangkul Bh
6 Gagang sapu Bh
7 Garuk Bh
8 Kain pel Bh
9 Keranjang sampah Bh
10 Parang Bh
11 Rajut Bh
12 Sabit Bh
13 Sapu lidi Bh
14 Sewa Air Mancur Unit
15 Skrop Bh
16 Tali ikat sapu Bh
17 Timbo Bh

PAKAIAN KERJA LAPANGAN


1 Helm Bh
2 Jas hujan Bh
3 Kaos Bh
4 Masker Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
5 Pakaian kerja Bh
6 Sarung tangan Psg
7 Sepatu lapang Psg
8 Topi Bh

PUPUK
1 Furadan Bks
2 Matador Bks
3 Pupuk Kompos Zak
4 Pupuk NPK Mutiara Bks
5 Pupuk Urea Zak
6 Pupuk ZA Petrokimia Zak

V. LAMPU TAMAN DAN PERALATAN LISTRIK


1 Air Conditioning (AC) 1 1/2 PK Unit
2 Air Conditioning (AC) 1 PK Unit
3 Air Conditioning (AC) 1/2 PK Unit
4 Air Conditioning (AC) 2 PK Unit
5 Air Conditioning (AC) 3/4 PK Unit
6 Arde Bh
7 Arde 08 mm M'
8 Arde 12 mm M'
9 Arde 12 mm yang panjang M'
10 Arde 14 mm M'
11 Arde 16 mm M'
12 Arde 16 mm yang panjang M'
13 Arde 18 mm M'

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
14 Balok 20 Watt Double Bh
15 Balok 40 Watt Double Bh
16 Batu Baterai Timer Set
17 BC (kabel tembaga) 06 mm M'
18 BC (kabel tembaga) 16 mm Bh
19 BC (kabel tembaga) 25 mm Bh
20 Box MCB 1 grup Bh
21 Box MCB 2 grup Bh
22 Box MCB 3 grup Bh
23 Box meter MG Bh
24 Box Meter panel saka 1P/B Bh
25 Box Panel KWH 40/60 cm Bh
26 Box presto uticon 4 grup Bh
27 Box presto uticon 8 grup Bh
28 BUSBAR (Plat Tembaga) Nol & Arde (2x20mm) M'
29 CONECTOR Bh
30 Conector Picing Bh
31 Contactor Bh
32 Dop 10W sampai 100W Bh
33 Dop Pijar Bh
34 Dop Ps-47 Chiyoda Bh
35 FET 43D Rol
36 Fitcing tempel ( broco) Bh
37 Fiting Halogen Stick 1000 Watt Bh
38 Fiting Halogen Stick 150 Watt Bh
39 Fiting Halogen Stick 500/300 Watt Bh
40 Fiting Sambung E40-E27 Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
41 Fitting besi Kj E - 40 Bh
42 Fitting LHE 58 Watt ( E 40 ) Bh
43 Fitting Sambung Keramik E 27 Bh
44 Fitting TL Bh
45 Ft besi berco E - 27 Bh
46 Ft besi Kj E - 40 Bh
47 Ft ceramic E-40 gantung Bh
48 Fuse box Broco 1 grup Bh
49 Fuse box Broco 2 grup Bh
50 Fuse box Broco 3 grup Bh
51 Fuse box Max 1 grup Bh
52 Hakiki NYAF serabut engkel NYAF = 0.75 mm(100m) Rol
53 Hakiki NYAF serabut engkel NYAF = 1.5 mm(100m) Rol
54 Hakiki NYAF serabut engkel NYAF = 2.5 mm(100m) Rol
55 Hakiki NYAF serabut engkel NYAF = 4 mm(100m) Rol
56 Hakiki NYAF serabut engkel NYAF = 6 mm(100m) Rol
57 Halogen stic 1000W Philips Bh
58 Halogen stic 150W philips Bh
59 Halogen stic 300W Philips Bh
60 Halogen stic 500W Philips Bh
61 Handel G2 15 Bh
62 Handel G2 32 Bh
63 Handel G2 63 Bh
64 Handel 60 A Bh
65 Handel G 2 30 A Blitz Bh
66 Handlle Bh
67 HPIT 250W Philips Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
68 HPIT 400W Philips Bh
69 Ignitor untuk Lampu Philips, S1- 51 putih Bh
70 Ignitor untuk Lampu Philips, S1- 58 kuning Bh
71 Ignitor untuk Lampu Philips, SN 50 Bh
72 Ignitor untuk Lampu Philips, SN 51 Bh
73 Ignitor untuk Lampu Philips, SN 52 Bh
74 Ignitor untuk Lampu Philips, SN 72 Bh
75 Ignitor untuk Lampu Philips, SN 75 Bh
76 Isolasi Bh
77 Jet power lampu selang (soket) Bh
78 Kabel NYA 1.5 mm 100 m Rol
79 Kabel NYA 1.5 mm 50 m Rol
80 Kabel NYA 2.5 mm 100 m Rol
81 Kabel NYA 2.5 mm 50 m Rol
82 Kabel MYM Focus 4 x 4 mm Rol
83 Kabel NGA 1 x 1,5 mm Rol
84 Kabel NGA 1 x 2,5 mm Rol
85 Kabel NYAF SERABUT=0,75 mm Rol
86 Kabel NYM 3 x 4 mm Rol
87 Kabel NYM 4 x 2,5 mm Rol
88 Kabel Nymhy (serabut) 2 x 0.75 mm Roll
89 Kabel Nymhy (serabut) 2 x 2.5 mm Roll
90 Kabel Nymhy (serabut) 4 x 2.5 mm Roll
91 Kabel NYY 2 x 0,75 mm Rol
92 Kabel NYY 2 x 1,5 mm @ 100 m Rol
93 Kabel NYY 2 x 1,5 mm @ 100 m Rol
94 Kabel NYY 2 x 2,5 mm Rol

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
95 Kabel NYY 2 x 2,5 mm @ 100 m Rol
96 Kabel NYY 2 x 2,5 mm @ 50 m Rol
97 Kabel NYY 3 x 1,5 mm @ 100 m Rol
98 Kabel NYY 3 x 2,5 mm @ 100 m Rol
99 Kabel NYY 3 x 2,5 mm @ 50 m Rol
100 Kabel NYY 4 x 2,5 mm @ 100 m Rol
101 Kabel NYY 4 x 2,5 mm @ 50 m Rol
102 Kabel NYY 4 x 4 mm @ 100 m Rol
103 Kabel NYY 4 x 4 mm @ 50 m Rol
104 Kabel NYY 4 x 4 mm @ 50 m Rol
105 Kabel NYY 4 x 6 mm @ 100 m Rol
106 Kabel NYY HYO 2 x 0,75 mm @ 100 m Rol
107 Kabel NYY HYO 2 x 0,75 mm @ 50 m Rol
108 Kabel NYY HYO 2 x 1,5 mm @ 100 m Rol
109 Kabel NYY HYO 2 x 1,5 mm @ 50 m Rol
110 Kabel NYY HYO 2 x 2,5 mm @ 50 m Rol
111 Kabel NYY HYO 2x 2,5 mm @ 100 m Rol
112 Kabel NYY HYO 3 x 1,5 mm @ 100 m Rol
113 Kabel NYY HYO 3 x 1,5 mm @ 50 m Rol
114 Kabel NYY HYO 3 x 2,5 mm @ 100 m Rol
115 Kabel NYY HYO 3 x 2,5 mm @ 50 m Rol
116 Kabel PVC 2 x 23 mm Rol
117 Kabel Twistied 2 x 10 Apolo M'
118 Kabel Twistied 2 x 10 Daisaku M'
119 Kabel Twistied 2 x 10 Pulong M'
120 Kabel Twistit (Pulung) M'
121 Kabel U NYY 6 mm (kabel meter) M'

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
122 Kap Halogen 1000 Rol
123 Kap Halogen 150 Rol
124 Kap Halogen 500/300 Rol
125 Kap HPIT 250 Watt Bh
126 Kap HPIT 400 Watt Bh
127 Kap ijo E- 27 pasific Bh
128 Kap ijo E- 40 dexta Bh
129 Kap Lampu Gantung Hijau (E-40) Bh
130 Kap Lampu TL 20 Watt balak TKOU 1 X 20 Bh
131 Kap Lampu TL 40 Watt balak TKOU 1 X 40 Bh
132 Kap MC Bh
133 Kap Reflektor (putih) Kap. Industri 8" E40 Bh
134 Kap Totok Bh
135 Kapasitor 25 µ Bh
136 Kapasitor 30 µ Bh
137 Kawat Tarik uk 14 Bh
138 Klem Dexicon no. 5 -7 Bh
139 Klem Dexicon no. 8 - 17 Bh
140 Klem Imundex no 10 Dos
141 Klem Imundex no 12 Dos
142 Klem Imundex no 17 Dos
143 Klem Imundex no 4 Dos
144 Klem Imundex no 5 Dos
145 Klem Imundex no 6 Dos
146 Klem Imundex no 7 Dos
147 Klem Imundex no 8 Dos
148 Klem Imundex no 9 Dos

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
149 Konektor Bh
150 Kontaktor Telemekanik Bh
151 Kontaktor Telemekanik 18 Bh
152 Kontaktor Telemekanik 19 Bh
153 KWH meter Fuji darma Bh
154 KWH meter metbelosa Bh
155 Lampu Halopika spring Bh
156 Lampu Spot JCDR 20 Watt Bh
157 Lampu Spot JCDR 50 Watt Bh
158 Lampu TL 2 x 20 watt komplit Bh
159 Lampu Bola Kaca Taman Bh
160 Lampu Cocrolux EL Compact E 27 18 Watt Bh
161 Lampu dinding Bh
162 Lampu dop pijar 10 W Philips-15W Bh
163 Lampu dop pijar 100 W Bh
164 Lampu dop pijar 200 W Bh
165 Lampu dop pijar 25 W Philips-40W Bh
166 Lampu dop pijar 5 W Bh
167 Lampu dop pijar 60 W Philips-75W Bh
168 Lampu Dulux " D " Modern G 24d 10 Watt Bh
169 Lampu Hias (Selang) 10m Bh
170 Lampu Hias Meteor Uk. 40 cm Bh
171 Lampu Hias Meteor Uk. 60 cm Bh
172 Lampu Hias Meteor Uk. 80 cm Bh
173 Lampu itami jari biasa Bh
174 Lampu kolam Ttk
175 Lampu LHE 13 Watt ( E 27 ) Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
176 Lampu LHE 18 Watt Spiral( E 27 ) Bh
177 Lampu LHE 23 Watt ( E 27 ) Bh
178 Lampu LHE 24 Watt ( E 27 ) Bh
179 Lampu LHE 25 Watt Spiral ( E 27 ) Bh
180 Lampu LHE 36 Watt ( E 27 ) Bh
181 Lampu LHE 36 Watt Kuning ( E 27 ) Bh
182 Lampu LHE 45 Watt (E27) Bh
183 Lampu LHE 45 Watt Kuning (E27) Bh
184 Lampu LHE 58 Watt ( E 27 ) Bh
185 Lampu LHE 58 Watt ( E 40 ) Bh
186 Lampu LHE 58 Watt Kuning ( E 40 ) Bh
187 Lampu LHE 80 Watt ( E 40 ) Bh
188 Lampu MC 125 Watt Bh
189 Lampu MC 250 Watt Bh
190 Lampu MC 250 Watt Kuning Bh
191 Lampu MC 400 Watt Bh
192 Lampu MC 400 Watt Kuning Bh
193 Lampu Meteor Bh
194 Lampu ML 160 Watt Bh
195 Lampu philips ML 500 W Bh
196 Lampu philips ML 160 W Bh
197 Lampu philips ML 250 W Bh
198 Lampu Pijar Khusus Ph., Softone 10 W Bh
199 Lampu Pijar Umum Ph., Argenta 100 W Bh
200 Lampu Pijar Umum Ph., Argenta 25 W Bh
201 Lampu Pijar Umum Ph., Argenta 40 W Bh
202 Lampu Pijar Umum Ph., Argenta 60 W Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
203 Lampu Pijar Umum Ph., Argenta 75 W Bh
204 Lampu Pijar Umum Ph., S P T60 40 W Bh
205 Lampu Pijar Umum Ph., S W T60 100 W Bh
206 Lampu Pijar Umum Ph., S W T60 25 W Bh
207 Lampu Pijar Umum Ph., S W T60 40 W Bh
208 Lampu Pijar Umum Ph., S W T60 60 W Bh
209 Lampu Pijar Umum Ph., S W T60 75 W Bh
210 Lampu Pijar Umum Ph., Softone 10 W Bh
211 Lampu Pijar Umum Ph., Softone 100 W Bh
212 Lampu Pijar Umum Ph., Softone 15 W Bh
213 Lampu Pijar Umum Ph., Softone 150 W Bh
214 Lampu Pijar Umum Ph., Softone 200 W Bh
215 Lampu Pijar Umum Ph., Softone 25 W Bh
216 Lampu Pijar Umum Ph., Softone 40 W Bh
217 Lampu Pijar Umum Ph., Softone 60 W Bh
218 Lampu Pijar Umum Ph., Softone 75 W Bh
219 Lampu Pijar Umum Ph., SP Lux 100 W Bh
220 Lampu Pijar Umum Ph., SP Lux 25 W Bh
221 Lampu Pijar Umum Ph., SP Lux 40 W Bh
222 Lampu Pijar Umum Ph., SP Lux 60 W Bh
223 Lampu Pijar Umum Ph., SP Lux 75 W Bh
224 Lampu Selang Rol
225 Lampu Sokle 300 Watt Bh
226 Lampu sorot Bh
227 Lampu Sorot PAR 220 V 120 W Bh
228 Lampu Sorot PAR 220 V 80 W Bh
229 Lampu spot light 150 watt eks philips ( lengkap) Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
230 Lampu spot light 300 watt eks philips ( lengkap) Bh
231 Lampu Taman Bh
232 Lampu TL 2 x 40 watt komplit Bh
233 Lampu TL down light besar Bh
234 Lampu TL down light kecil Bh
235 Lampu TL 10 Watt Bh
236 Lampu TL 20 Watt Bh
237 Lampu TL 20 watt komplit Bh
238 Lampu TL 32 Watt Bulat Bh
239 Lampu TL 40 Watt Bh
240 Lampu TL 40 watt komplit Bh
241 Lampu TL. Elektrik bulat / exon 20 watt philips Bh
242 Lampu TL. Elektrik merk philips 11 watt Bh
243 Lampu TL. Elektrik merk philips 14 watt Bh
244 Lampu TL. Elektrik merk philips 18 watt Bh
245 Lampu TL. Elektrik merk philips 23 watt Bh
246 Lampu TL. Elektrik merk philips 5 watt Bh
247 Lampu TL. Elektrik merk philips 8 watt Bh
248 Large Angle Bh
249 Mano Meter Bh
250 MC ML-N 125W Osram (Tanpa trafo) Bh
251 MC ML-N 250W Osram (Tanpa trafo) Bh
252 MC ML-N 500W Osram (Tanpa trafo ) Bh
253 MC HPL-N 125W Osram (Trafo) Bh
254 MC HPL-N 125W Philips (Trafo) Bh
255 MC HPL-N 250W Osram (Trafo) Bh
256 MC HPL-N 250W Philips (Trafo) Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
257 MC HPL-N 400W Osram (Trafo) Bh
258 MC HPL-N 400W Philips (Trafo) Bh
259 MCB 25 A Psg
260 MCB 2A Psg
261 MCB 50 A Psg
262 MCB 63 A Bh
263 MCB MG Hitam 10 A Psg
264 MCB MG Hitam 16 A Psg
265 MCB MG Hitam 20 A Psg
266 MCB 1 fase (10A) Bh
267 MCB 1 fase (16A) Bh
268 MCB 1 fase (25A) Bh
269 MCB 1 fase (35A) Bh
270 MCB 1 fase (63A) Bh
271 MCB 32 Psg
272 MCB 40 A Psg
273 Mitsubishi Magnetic SN-10/220 Bh
274 Mitsubishi Magnetic SN-12/220 Bh
275 Mitsubishi Magnetic SN-21/220 Bh
276 Mitsubishi Magnetic SN-25/220 Bh
277 Mitsubishi Magnetic SN-35/220 Bh
278 Mitsubishi Magnetic SN-65/220 Bh
279 NFB 100A Bh
280 NFB 125A Bh
281 NFB 75A Bh
282 Nyaf 1.5 m eterne Roll
283 NYM 2X1.5 hakiki Roll

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
284 NYM 2X2.5 hakiki Roll
285 NYM 2X4 hakiki Roll
286 NYM 3X1.5 hakiki Roll
287 NYM 3X2.5 hakiki Roll
288 NYM 3X6 hakiki Roll
289 NYM 4X1.5 hakiki Roll
290 NYM 4X2.5 hakiki Roll
291 NYM 4X4 hakiki Roll
292 Nym focos 3 x 2.5 mm Roll
293 Nym focos 3 x 4 mm Roll
294 Nym focos 4 x 2.5 mm Roll
295 Nym focos 4 x 4 mm Roll
296 NYZ 2X23 (oval) hakiki Roll
297 Ongkos pasang titik lampu + instalasi Ttk
298 Paket PJU Solar Cell 5 m Modul 50 WP (10 watt) Pkt
299 Paket PJU Solar Cell 6 m Modul 80 WP (20 watt) Pkt
300 Paket PJU Solar Cell 7 m Modul 100 WP (30 watt) Pkt
301 Paket PJU Solar Cell 8 m Modul 130 WP (40 watt) Pkt
302 Paket PJU Solar Cell 9 m Modul 130 WP (40 watt) Pkt
303 Panel Box (40x60x20) Bh
304 Panel CU 3 Bh
305 Pasang KWH Meter 1300 VA Psg
306 Pasang KWH Meter 2200 VA Psg
307 Pasang KWH Meter 3500 VA Psg
308 Pasang KWH Meter 4400 VA Psg
309 Pasang KWH Meter 900 VA Psg
310 Pasang listrik baru 900 watt Unit

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
311 Pasang Tiang Listrik Cor Beton Bh
312 Philips jari essential 11 w Bh
313 Philips jari essential 13 w Bh
314 Philips jari essential 14 w Bh
315 Philips jari essential 18 w Bh
316 Philips jari essential 23 w Bh
317 Philips jari essential 26 w Bh
318 Philips jari essential 36 w Bh
319 Philips jari essential 45 w Bh
320 Philips jari essential 5 w Bh
321 Philips jari essential 65 w Bh
322 Philips jari essential 8 w Bh
323 Philips jari essential 85 w Bh
324 Philips SL Bh
325 Picing / Konektor Bh
326 Pipa Besi (Tiang bantu) Uk 3" dan 2½" Ljr
341 Piting TL Bh
342 Pose Bot Buah
343 Rel barr M'
344 Rel MCB Lot
345 Saklar ganda Bh
346 Saklar Panasonic (ganda) Bh
347 Saklar Panasonic (tunggal) Bh
348 Saklar tunggal Bh
349 Sambungan Jet P Lampu Selang Rol
350 Sed And As Bh
351 Sekring Komplit 50 A Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
352 Sekring Matsuka 2 A - 10 A Bh
353 Selcon photosel 03A Bh
354 Selcon photosel 06A Bh
355 Selcon photosel 10A Bh
356 Sevis Bh
357 Shinyoku PLC 40w E-27 Bh
358 Shinyoku PLC 45w E-27 Bh
359 SISIR MCB 3 fase Lot
360 SKUN Kabel 16mm Bh
361 SKUN Kabel 25mm Bh
362 Soket Halogen 1000 Watt Bh
363 Soket Halogen 150 Watt Bh
364 Soket Halogen 500/300 Watt Bh
365 SON-H 250W Philips Bh
366 SON-H 350W Philips Bh
367 SON-T 250W Philips Bh
368 SON-T 400W Philips Bh
369 Sprayer Rol
370 Stater / S2 Bh
371 Stater / S4 Bh
372 Stop kontak Bh
373 Stop kontak Panasonic Bh
374 Sunnyco 45W/kuning Bh
375 Sunnyco 45W/putih Bh
376 T. Dos Kotak Bh
377 Tali Ties 10 cm Pak
378 Tali Ties 15 cm Pak

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
379 Tali Ties 20 cm Pak
380 Terminal 10 mm Bh
381 Terminal 16 mm Bh
382 Terminal 25 mm Bh
383 Terminal 6 mm Bh
384 Time Swite Bh
385 Timer Bh
386 TL 10W Focus Bh
387 TL 10W Philips Bh
388 TL 15W Chiyoda Bh
389 TL 15W Philips Bh
390 TL 18W Philips Bh
391 TL 20W Chiyoda Bh
392 TL 36W Philips Bh
393 TL 40W Chiyoda Bh
394 Trafo Elektrik TL 20 Watt Bh
395 Trafo Elektrik TL 40 Watt Bh
396 Trafo 5 Am Bh
397 Trafo MC 125 Watt Bh
398 Trafo MC 250 Watt Bh
399 Trafo MC 400 Watt Bh
400 Trafo TL 10 Watt Bh
401 Trafo TL 15 Watt Bh
402 Trafo TL 20 Watt Bh
403 Trafo TL 40 Watt Bh
404 Travo 125W Philips Bh
405 Travo 250W Philips Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
406 Travo 400W Philips Bh
407 Trek Schok Bh
408 Viga PLC 85w E-27/Fitingan kecil Bh
409 Viga PLC 85w E-40/Fitingan besar Bh

ALAT-ALAT LISTRIK
1 Avo Meter Bh
2 Belenja Tanda Rambu Bh
3 Bor Listrik Bh
4 Ganco Bh
5 Gergaji Bh
6 Kunci inggris Bh
7 Kunci set Bh
8 Meteran ( 50 ) Bh
9 Sekrop Bh
10 Senter Bh
11 Senter Kepala Bh
12 Solder Bh
13 Tanda rambu (Trafic cone) Bh
14 Tang Bh
15 Tang Skut Bh
16 Tang Wentes Bh
17 Tangga (aluminium) 4 m ` Bh
18 Tangga (aluminium) 6 m ` Bh
19 Tangga aluminium) 3 m Bh
20 Testpen Bh
21 Tangga fiber anti petir Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3

PAKAIAN KERJA DAN KELENGKAPAN ANTI STRUM


1 Helm Bh
2 Jas Hujan Bh
3 Kaos Panjang Bh
4 Kaos pendek Bh
5 Katelpak Stell
6 Sabuk Pengaman Set
7 Sarung tangan Psg
8 Sepatu Psg
9 Sepatu harian Psg
10 Topi kerja Bh

ALAT-ALAT PMK
1 APAR Powder 3,5 Kg Bh
2 APAR Powder 6 Kg Bh
3 Baju PDH Stel
4 Baju PDL Stel
5 Busa Unit
6 Butterfly valve XJ series Bh
7 Cast iron valves Bh
8 CO2 Unit
9 Diesel air 5 PK Bh
10 Hallon Unit
11 Handy Talky (HT) Bh
12 Helm Pemadam Kebakaran Bh
13 Jaket Anti Api Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
14 Jaket anti panas Stel
15 Jaket dan Celana anti Api (Nomex Akida) Bh
16 Kelmo ex series Bh
17 Kunci Pas Bh
18 Kunci Ring Bh
19 Kunci Sock Bh
20 Kunci Sok Hydrant dan Sok Hydrant Bh
21 Masker Pemadam Kebakaran Full Face Bh
22 Nozzle Gun Protek 1,5 Bh
23 Nozzle Gun Protek 2,5 Bh
24 Petor spray 1,5 Bh
25 Petor spray 2,5 Bh
26 Pompa air diesel 4,5 PK Unit
27 Pompa air diesel 5,5 PK Unit
28 Powder Unit
29 Resillient seated Bh
30 Sarung Tangan Pemadam Kebakaran Bh
31 Selang sprial 2 ø M'
32 Selang sprial 3 ø M'
33 Senter kepala Bh
34 Slang busa zigler 1,5 ø Bh
35 Slang busa zigler 2,5 ø Bh
36 Slang milyard benan 1,5" M'
37 Slang pemadam 1,5" Bh
38 Slang pemadam 2,5" Bh
39 Slang pembasahan Rol
40 Tabung apar CO2 3 kg Bh

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
41 Tabung apar CO2 6 kg Bh
42 Tabung apar CO2 9 kg Bh
43 Tabung apar Hallon 3 kg Bh
44 Tabung apar Hallon 4 kg Bh
45 Tabung apar Hallon 7 kg Bh
46 Tabung apar powder 3,5 kg Bh
47 Tabung apar powder 6 kg Bh
48 Tabung apar powder 9 kg Bh
49 Tabung apar super busa 10 Lt Bh
50 Y conection (overlube cabang) Bh

VI. SUKU CADANG ALAT BERAT


A. WHEEL LOADER JCB 415 ENGINE
1 Piston pc
2 Piston ring set
3 Packing set set
4 Metal jalan set
5 metal duduk set
6 Valve in & ex pc
7 Nozzle pc
8 Crank shaft set
9 Turbo charger set
10 Repairkeet rotary pump set
11 Fuel filter primary pc
12 Fuel filter secundury pc
13 Oil filter engine pc
14 Filter transmisi pc

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
15 Hidraulic Filter pc
16 Air cleaner inner pc
17 Air cleaner outher pc

POWER SHIFT TRANSMISSION DAN TOURGO CONVENTER


1 Piston transmision pc
2 Seal piston transmission set
3 Disc frietion pc
4 Plate pc
5 Overhoul gasket trans set
6 Universal joint set
7 Hose pump pc
8 Control valve transmisi / elektrik set
9 Handle electric set

HYDROULIC
1 Hose assy bucket pc
2 Hose assy boom pc
3 Hose as stering pc
4 Hose as pum[ hidroulc pc
5 Hose as life pc
6 Hose as control valve pc
7 Oil seal stering assy set
8 Seal piston Hydraulic Bump set
9 control valve repairkeet set

BRAKE

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
1 Disc brake pc
2 Piston cylinder brake / seal set
3 vacum brake set
4 Blower set
5 Master brake pusat set

ELECTRIC
1 Perlengkapan lampu set
2 Engine starter set
3 Alternator set

LAIN - LAIN
1 Ban luar / dalam set
2 Accu 12 Volt 100 AH pc

B. SUKU CADANG BULLDOZZER


ENGINE
1 Filter oil engine pc
2 Fuel filter pc
3 Hydroluic filter pc
4 Air cleaner inner pc
5 Air cleaner outher pc

HYDROULIC
1 Hose as motor hydroulic pc

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
2 Hose as hydroli boom pc
3 Hose as hydroulic pump pc
4 Hose as universal hydroulic pc
5 Sealkeet cylinder boom set

UNDER CARRAGE
1 Bolt track shoes pc
2 Bolt couthing pc
3 Carrier roller pc
4 Track roller set
5 Segmen set
6 Kit seal recoil spring set

ELECTRIC
1 Accu 12 Volt 150 AH accu kering ) unit
2 Monetoring electric unit
3 Fuel pump electric set
4 Lampu lampu set

C. SUKU CADANG EXAVATOR PC 200


1 Filter fuel 600,311,9121 pc
2 Filter fuel 6732,71,61111 pc
3 Water corrosic 600,41,1191 pc
4 Oil filter 6736,51,5141 pc
5 Air cleaner ineer 600,185,3120 pc
6 Air cleaner outher 600,185,3110 pc
7 Hose bucket pc

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
8 Hose as stick pc
9 Hose as filter oil engine pc
10 Oil seal piston hydroulic set
11 track roller pc
12 Carrear roller pc
13 segmen set
14 Gear turn table set

D. SUKU CADANG BACKHOE LOADER CATTERPILAR


ENGINE
1 Piston pc
2 Piston ring set
3 Packing set set
4 Linner pc
5 metal jalan set
6 metal duduk set
7 Bush conecting rod set
8 Valve in & ex pc
9 Seating valve pc
10 Air cleaner set

TRANSMISION
1 Disc fricsion pc
2 Plate pc
3 Overhoul gasket set
4 Selenoit valve set
5 Spring as set

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
6 Shaft as input unit

FILTER
1 Fuel filter pc
2 Oil filter pc
3 Hydroulic filter pc
4 Control valve set
5 Hose as boom pc
6 Hose as stick pc
7 Hose as swing pc
8 Hose as bucket pc
9 Hose as Jack pc
10 Oil seal kit 9tT0415 set
11 Oil seal kit 6E3983 set
12 Oil seal kit stick 6E0290 set
13 Oil seal kit boom 6E0274 set
14 Coupling GP pump set
15 Tire front set
16 Tire rear set
17 Accu 12 volt 150 AH unit

E. SUKU CADANG WALLES 6 - 8 TON


1 Fuel filter Oil filter pc
2 Oil filter
3 Diapram pc
4 Nozzle pc
5 Plunger pc

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
6 Ring piston pc
7 Piston assy pc
8 Metal jalan set
9 Metal duduk set
10 Crank shaft pc
11 Gasket set set
12 Valve in & ex pc
13 Linner pc
14 Water pump pc
15 Timing chain set
16 Coupling assy unit
17 Baut special pc
18 Piringan 270300 set
19 Piringan kopling 271700 set
20 Lever 040021 pc
21 Lever 040023 pc
22 Holow shaft pc
23 Rumah bantalan 040026 pc
24 Poros piringan 270048 pc
25 oros sirp pc
26 Bingkai kopling 270061 pc
27 Pelat tekan pc
28 Garpu K10021 pc
29 Sambungan bintang pc
30 Hardy kopling pc
31 Pinion pc
32 Bushing pc

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
33 Bantalan poros pc
34 Beraing 22212c pc
35 Beraing 6308 pc
36 Beraing 6019 pc
37 Beraing nu 208 pc
38 Beraing 30208 pc
39 Beraing 30207 pc
40 Oil seal 105 130 13 pc
41 Oil seal 60 85 12 pc
42 Oil seal 50 80 12 pc
43 Oil seal 40 60 10 pc
44 Oil seal 50 72 10 pc
45 Pen 04 00 18 pc
46 Pen 04 00 20 pc
47 Poros beralur 06 00 70 pc
48 poros beralur 06 00 137 pc
49 Poros penghubung 025/06 00 94 pc
50 Gigi pencekram 06 00 138 pc
51 Bearing 22 21 5c pc
52 Bearing 21 30 6c pc
53 Bearing 21 30 7c pc
54 Bearing 30 21 5 pc
55 Bearing 32 21 0 pc
56 Bearing 30 21 3 pc
57 Nedle bearing pc
58 Oil seal 80 100 12 pc
59 Ring gear pc

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
60 Poros 12/130012 a pc
61 Bush 18/130018 pc
62 poros cacing pc
63 Gigi tembereng pc
64 Poros roda muka pc
65 Bushing roda muka 12 00 16 a pc
66 Bushing roda muka 02 00 24 pc

F. WALLES 8 TON MG6 / MV6


1 Metal jalan set
2 Metal duduk set
3 Bush kontrol set
4 Piston ring set
5 Piston pc
6 Cylinder pc
7 Vant belt pc
8 Valve in & ex pc
9 Nozzle pc
10 Oil filter pc
11 Fuel filter pc
12 packing set set

G. WALLES MINI 2,5 TON


1 Metal jalan set
2 Metal duduk set
3 Crank shaft pc
4 Valve in pc

CK: BM: TRTB: DKP: Air:


No URAIAN KEGIATAN SAT.

1 2 3
5 Valve ex pc
6 Nozzle pc
7 Piston pc
8 Ring piston pc
9 van belt pc
10 Packset set
11 Bantalan Karet 25334 pc
12 Beraing nu 2216 pc
13 Beraing N 216 pc
14 Hollow journal pc
15 Large sideplate 01/18 pc
16 Roller chain DIN 8187 set
17 Chain wheel 17 teech pc
18 Shaft 03/01/9 pc
19 Nedle bearing NA 6910 pc
20 Cylinder roller beraing NU 2208 pc
21 Poros pinion 03/01/04 pc
22 Chain wheel 24 teeth pc
23 Bearing NUP 2211 mac 3 pc
24 Beraing NUP 1016 MAC 3 pc
25 Bbearing casing 03/01/3 pc
26 Gemmer sterring GD58 set
27 Van belt 180 mm 155 mm pc
28 Van belt 12,5 x 1800 pc
29 Van belt 12,5 x 1350 pc

CK: BM: TRTB: DKP: Air:


AS PU- BM CK DAN DINAS PU PENGAIRAN ESDM
N 2013 KABUPATEN TULUNGAGUNG

HARGA NON PAJAK


HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6

57,500.00 57,500.00
57,500.00 57,500.00
57,500.00 57,500.00
57,500.00 57,500.00
62,500.00 62,500.00
45,000.00 45,000.00
68,000.00 68,000.00
47,500.00 47,500.00
50,000.00 50,000.00
47,500.00 47,500.00
60,000.00 60,000.00
50,000.00 50,000.00
45,000.00 45,000.00
55,000.00 55,000.00
55,000.00 55,000.00
45,000.00 45,000.00
45,000.00 45,000.00
45,000.00 45,000.00
45,000.00 45,000.00

66.00 70.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
125,000.00 135,000.00
3,000.00 3,000.00
115,000.00 120,000.00
185,000.00 190,000.00
100,000.00 110,000.00
10,000.00 12,500.00
2,400.00 2,500.00
30,000.00 30,000.00
90,000.00 125,000.00
1,900.00 2,800.00
152,000.00 155,000.00
191,500.00 195,000.00
192,000.00 195,000.00
152,000.00 155,000.00
198,000.00 205,000.00
146,000.00 150,000.00
243,000.00 267,300.00
600.00 700.00
160,000.00 175,000.00
150,000.00 165,000.00
99,000.00 100,000.00
106,000.00 110,000.00
106,000.00 110,000.00
1,363,700.00 1,409,100.00
165,000.00 170,000.00
141,000.00 154,600.00
137,500.00 140,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
143,000.00 145,000.00
82,500.00 88,000.00
65,500.00 81,900.00
825,000.00 830,000.00
82,500.00 85,000.00
260,000.00 290,000.00
255,000.00 285,000.00
230,000.00 260,000.00
200,000.00 225,000.00
165,000.00 185,000.00
156,400.00 177,300.00
125,000.00 135,000.00
135,000.00 145,000.00
118,200.00 145,500.00
92,500.00 95,000.00
231,000.00 240,000.00
331,400.00 364,500.00
80,000.00 82,500.00
11,000.00 12,000.00
112,500.00 115,000.00
119,000.00 121,000.00
4,000.00 5,000.00
17,500.00 19,000.00
28,000.00 35,000.00
30,000.00 35,000.00
192,000.00 204,600.00
25,500.00 31,900.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
40,000.00 47,500.00
47,500.00 55,000.00
75,000.00 80,000.00
80,000.00 90,000.00
110,000.00 115,000.00
25,000.00 25,000.00
142,000.00 150,000.00
4,200.00 4,500.00
1,500.00 1,600.00
3,700.00 3,800.00
6,600.00 6,700.00
1,800.00 2,000.00
1,600.00 1,700.00
1,300.00 1,400.00
125,000.00 150,000.00
5,000.00 5,500.00
436,400.00 545,500.00
16,000.00 21,000.00
175,000.00 175,000.00
9,600,000.00 9,800,000.00
10,100,000.00 10,300,000.00
2,500,000.00 2,600,000.00
23,181,900.00 23,409,100.00
19,200,000.00 20,000,000.00
30,909,100.00 31,363,700.00
19,800,000.00 20,454,600.00
10,200,000.00 10,450,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
10,700,000.00 10,900,000.00
16,000.00 16,000.00
3,500.00 3,500.00
7,800,000.00 8,000,000.00
8,300,000.00 8,500,000.00
7,800,000.00 8,000,000.00
8,300,000.00 8,500,000.00
5,400,000.00 5,600,000.00
5,900,000.00 6,100,000.00
4,200,000.00 4,250,000.00
4,500,000.00 4,545,500.00
4,000.00 4,500.00
2,700.00 3,000.00
1,200.00 1,500.00
3,000.00 3,100.00
99,000.00 100,000.00
200,000.00 210,000.00
172,000.00 175,000.00
318,200.00 327,300.00
66,000.00 70,000.00
120,000.00 200,000.00
54,600.00 77,300.00
65,000.00 70,000.00
52,800.00 55,800.00
47,000.00 51,700.00
50,000.00 55,000.00
53,000.00 58,300.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
55,000.00 56,000.00
58,000.00 59,000.00
34,000.00 37,000.00
36,000.00 39,000.00
54,000.00 57,000.00
59,000.00 62,000.00
300,000.00 300,000.00
8,500.00 9,350.00
119,000.00 135,000.00
95,500.00 118,200.00
90,000.00 155,000.00
125,000.00 125,000.00
165,000.00 170,000.00
165,000.00 170,000.00
181,500.00 187,000.00
9,000.00 9,100.00
41,000.00 50,000.00
50,000.00 50,000.00
27,500.00 30,000.00
47,500.00 50,000.00
40,000.00 42,500.00
85,000.00 85,000.00

75,000.00 90,000.00
108,500.00 130,700.00
108,500.00 150,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
9,900.00 10,000.00
60,500.00 72,700.00
181,500.00 217,800.00
66,000.00 67,000.00
40,800.00 42,000.00

10,750.00 10,750.00
10,000.00 10,000.00

9,000.00 9,000.00
8,750.00 8,750.00
45,500.00 50,000.00
561,000.00 589,000.00
396,000.00 415,800.00
790,000.00 830,000.00
220,000.00 225,000.00
9,000.00 9,400.00
15,000.00 15,800.00
365,000.00 384,000.00
13,000.00 13,000.00
11,000.00 11,000.00
10,500.00 10,500.00
183,000.00 193,000.00
225,000.00 230,000.00
1,275,000.00 1,300,000.00
65,000.00 70,000.00
210,000.00 220,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
165,000.00 170,000.00
108,900.00 130,800.00
53,870.00 59,500.00
45,000.00 49,500.00
30,500.00 36,500.00
48,400.00 58,100.00
65,000.00 71,500.00
78,600.00 86,500.00
11,000.00 12,100.00
4,500.00 5,000.00
11,000.00 11,000.00
16,400.00 17,300.00
181,500.00 217,900.00
12,000.00 12,000.00
43,923,000.00 52,707,600.00
28,400.00 31,200.00
40,300.00 44,300.00
640,500.00 704,600.00
46,200.00 47,000.00
29,000.00 30,000.00
63,000.00 66,100.00
2,722,500.00 3,267,000.00
42,000.00 42,000.00
54,000.00 57,000.00
40,000.00 40,000.00
72,800.00 80,000.00
50,000.00 50,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
15,000.00 15,000.00
15,300.00 15,800.00
20,000.00 22,000.00
78,000.00 82,000.00
59,000.00 62,000.00
847,000.00 1,050,000.00
907,500.00 1,100,000.00
1,210,000.00 1,500,000.00
1,430,000.00 1,600,000.00
2,050,000.00 2,300,000.00
30,300.00 36,300.00
43,200.00 45,300.00
60,000.00 61,000.00
420,000.00 441,000.00
850,000.00 892,500.00
4,620,000.00 4,851,000.00
121,000.00 145,000.00
15,600.00 16,000.00
3,500.00 3,750.00
136,400.00 182,000.00
20,500.00 23,000.00
36,000.00 40,000.00
54,000.00 60,000.00
63,000.00 70,000.00
72,000.00 80,000.00
102,500.00 123,500.00
16,500.00 18,500.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
20,500.00 23,000.00
24,500.00 27,500.00
33,000.00 36,500.00
41,000.00 45,500.00
49,000.00 55,000.00
237,000.00 249,000.00
135,000.00 135,000.00
22,000.00 22,500.00
6,600.00 6,700.00
6,000.00 6,500.00
7,700.00 7,800.00
9,000.00 9,500.00
9,600.00 10,000.00
48,000.00 50,400.00
96,000.00 100,800.00
107,000.00 112,300.00
9,700.00 9,800.00
9,600.00 9,700.00
318,200.00 381,900.00
227,300.00 272,800.00
363,700.00 436,400.00
181,500.00 217,800.00
410,000.00 455,000.00
151,200.00 181,500.00
286,500.00 315,000.00
99,000.00 121,000.00
82,500.00 136,500.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
110,000.00 181,500.00
247,500.00 248,000.00
847,000.00 932,000.00
968,000.00 1,162,000.00
1,573,000.00 1,888,000.00
1,840,000.00 2,046,000.00
2,750,000.00 3,000,000.00
6,600.00 6,700.00
7,700.00 7,800.00
115,000.00 120,000.00
8,000.00 12,000.00
9,000.00 13,500.00
12,500.00 18,750.00
15,000.00 22,500.00
17,500.00 26,250.00
21,000.00 31,500.00
10,500.00 15,750.00
4,000.00 6,000.00
6,000.00 9,000.00
44,600.00 45,500.00
21,000.00 22,000.00
201,000.00 212,000.00
286,000.00 301,000.00
134,000.00 141,000.00
231,000.00 243,000.00
122,000.00 129,000.00
207,000.00 218,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
21,000.00 22,000.00
12,100.00 12,200.00
118,000.00 123,900.00
52,800.00 55,400.00
318,200.00 341,000.00
69,000.00 70,000.00
9,900.00 10,000.00
30,000.00 31,500.00
2,420,000.00 2,904,000.00
553,000.00 580,700.00
590,000.00 619,500.00
90,000.00 94,500.00
15,000.00 15,800.00
14,300.00 15,000.00
12,000.00 13,000.00
13,200.00 21,800.00
85,800.00 86,000.00
681,900.00 691,000.00
2,272,800.00 2,727,300.00
52,800.00 53,000.00
54,000.00 55,000.00
136,400.00 163,700.00
79,200.00 80,000.00
159,100.00 191,000.00
1,136,400.00 1,363,700.00
32,700.00 45,900.00
39,500.00 53,400.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
4,300.00 7,100.00
12,800.00 12,900.00
16,400.00 16,400.00
1,700.00 1,800.00
30,000.00 31,000.00
7,200.00 7,300.00
1,200.00 1,300.00
4,000.00 4,300.00
84,000.00 85,000.00
98,000.00 103,000.00
165,000.00 174,000.00
44,000.00 47,000.00
43,000.00 46,000.00
59,000.00 62,000.00
38,000.00 40,000.00
44,000.00 47,000.00
76,400.00 81,900.00
30,000.00 32,000.00
36,000.00 38,000.00
183,000.00 193,000.00
43,000.00 46,000.00
49,000.00 52,000.00
40,800.00 41,000.00
2,400.00 3,000.00
397,800.00 477,300.00
462,000.00 485,100.00
70,000.00 73,500.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
60,000.00 63,000.00
15,850.00 17,435.00
26,000.00 28,600.00
33,900.00 37,290.00
330,000.00 350,000.00
1,100,000.00 1,250,000.00
102,000.00 105,000.00
72,600.00 75,000.00
960,000.00 975,000.00
2,500.00 2,750.00
106,480.00 127,800.00
113,135.00 135,800.00
76,780.00 127,800.00
15,000.00 16,500.00
2,500.00 2,750.00
16,000.00 17,600.00
272,800.00 300,000.00
48,000.00 50,400.00
14,400.00 23,800.00
19,800.00 32,700.00
158,000.00 166,000.00
241,000.00 250,000.00
11,000.00 11,900.00
145,200.00 152,500.00
151,300.00 181,500.00
11,000.00 12,000.00
27,500.00 30,250.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
26,500.00 27,000.00
16,500.00 17,000.00
399,300.00 479,200.00
544,500.00 653,400.00
227,300.00 250,000.00
8,505,000.00 9,355,500.00
4,500.00 5,000.00
23,000.00 23,000.00
10,000.00 10,000.00
28,000.00 28,000.00
10,000.00 10,000.00
12,100.00 12,100.00
99,000.00 100,000.00
132,000.00 133,000.00
18,000.00 19,000.00
11,000.00 12,000.00
240,000.00 250,000.00
46,200.00 47,000.00
27,300.00 31,900.00
147,800.00 162,500.00
123,200.00 135,600.00
166,000.00 182,600.00
386,700.00 425,300.00
477,300.00 525,000.00
16,000.00 16,000.00
22,000.00 23,000.00
36,000.00 37,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
400.00 400.00
1,000.00 1,000.00
600.00 700.00
30,000.00 31,000.00
1,400.00 1,400.00
23,595,000.00 28,314,000.00
2,545,000.00 2,728,000.00
5,682,000.00 7,103,000.00
5,682,000.00 7,103,000.00
5,682,000.00 7,103,000.00
5,682,000.00 7,103,000.00
5,910,000.00 7,387,000.00
5,910,000.00 7,387,000.00
138,600.00 140,000.00
66,000.00 70,000.00
79,200.00 84,000.00
92,400.00 98,000.00
364,600.00 401,400.00
425,300.00 468,000.00
331,400.00 364,500.00
441,900.00 486,000.00
1,815,000.00 2,178,000.00
1,450.00 1,450.00
605,000.00 726,000.00
660,000.00 670,000.00
990,000.00 1,000,000.00
409,100.00 491,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
990,000.00 1,000,000.00
5,000,000.00 5,091,000.00
522,800.00 575,000.00
441,900.00 486,000.00
186,000.00 195,300.00
14,500.00 16,000.00
15,500.00 17,000.00
16,500.00 18,000.00
18,000.00 20,000.00
12,000.00 13,500.00
15,000.00 15,000.00
19,500.00 22,000.00
28,500.00 31,500.00
50,000.00 50,000.00
60,000.00 66,000.00
27,000.00 29,700.00
36,200.00 39,800.00
77,000.00 84,700.00
74,750.00 82,500.00
94,000.00 103,400.00
126,700.00 139,500.00
33,300.00 36,700.00
200,000.00 220,000.00
24,700.00 27,200.00
52,500.00 57,750.00
71,000.00 78,100.00
87,500.00 96,500.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
124,200.00 136,700.00
4,000.00 4,500.00
44,500.00 48,500.00
93,500.00 102,500.00
15,600.00 16,000.00
9,300.00 9,800.00
62,400.00 65,000.00
42,000.00 43,000.00
3,314,000.00 3,645,000.00
454,500.00 500,000.00
13,417,000.00 14,760,000.00
21,475,000.00 23,622,000.00
27,020,000.00 27,055,000.00
32,542,000.00 35,786,000.00
11,210,000.00 15,121,800.00
11,185,000.00 12,304,000.00
5,120,000.00 5,631,500.00
102,850,000.00 123,420,000.00
425,000.00 510,000.00
79,200.00 83,100.00
92,400.00 97,000.00
80,000.00 84,000.00
160,000.00 168,000.00
7,250.00 7,900.00
5,100.00 5,300.00
265,000.00 271,500.00
378,000.00 388,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
532,000.00 546,000.00
665,000.00 682,000.00
17,500.00 19,200.00
25,000.00 25,000.00
36,000.00 36,000.00
6,300.00 6,500.00
52,500.00 52,500.00
90,600.00 93,000.00
120,000.00 123,000.00
186,000.00 191,000.00
6,500.00 6,500.00
190,000.00 195,000.00
259,000.00 266,000.00
340,000.00 348,000.00
439,000.00 450,500.00
9,500.00 10,500.00
14,000.00 15,400.00
20,500.00 22,500.00
28,500.00 31,400.00
51,000.00 56,100.00
62,000.00 68,200.00
108,000.00 118,800.00
28,000.00 30,800.00
4,500.00 4,900.00
16,000.00 17,600.00
4,500.00 4,900.00
23,000.00 25,300.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
5,500.00 6,000.00
32,000.00 35,200.00
6,000.00 6,600.00
55,000.00 60,500.00
8,500.00 9,500.00
97,500.00 107,300.00
9,000.00 9,900.00
158,500.00 174,400.00
495,000.00 519,800.00
363,000.00 381,100.00
8,700.00 8,900.00
136,500.00 150,200.00
182,000.00 200,200.00
90,500.00 99,500.00
105,000.00 115,500.00
245,000.00 269,500.00
1,250,000.00 1,375,000.00
800,000.00 850,000.00
5,500.00 5,500.00
121,000.00 145,200.00
400,000.00 425,000.00
121,000.00 145,000.00
151,250.00 181,500.00
211,750.00 254,000.00
23,100.00 38,100.00
33,000.00 34,700.00
210,000.00 220,500.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
329,000.00 345,400.00
2,000.00 2,000.00
43,200.00 45,300.00
46,500.00 47,000.00
77,000.00 78,000.00
66,000.00 67,000.00
121,000.00 122,000.00
10,800.00 11,000.00
41,000.00 42,000.00
225,000.00 237,000.00
500.00 600.00
60,000.00 65,000.00
13,600.00 15,000.00
13,600.00 15,000.00
32,500.00 35,600.00
32,000.00 35,600.00
51,000.00 56,000.00
51,000.00 56,000.00
13,600.00 15,000.00
33,000.00 34,000.00
6,500.00 7,000.00
2,300.00 2,500.00
3,000.00 3,400.00
4,950.00 4,950.00
11,900.00 11,900.00
12,100.00 20,000.00
242,000.00 290,500.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
33,000.00 33,000.00
38,200.00 42,000.00
28,400.00 31,500.00
32,700.00 36,000.00
54,500.00 60,000.00
13,000.00 14,500.00
120,000.00 132,000.00
42,000.00 46,200.00
43,200.00 47,500.00
21,000.00 23,100.00
2,880,000.00 3,024,000.00
1,920,000.00 2,016,000.00
544,500.00 653,400.00
72,600.00 79,800.00
7,000.00 7,700.00
99,000.00 108,900.00
48,400.00 53,300.00
90,900.00 100,000.00
60,500.00 66,500.00
42,350.00 46,500.00
72,600.00 79,800.00
13,600.00 14,900.00
90,750.00 100,000.00
121,000.00 133,100.00
2,300.00 2,500.00
15,000.00 16,500.00
108,000.00 118,800.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
151,250.00 166,400.00
1,000.00 1,100.00
1,100.00 1,200.00
93,000.00 94,000.00
26,400.00 27,000.00
300,000.00 325,000.00
396,000.00 4,158,000.00
5,445,000.00 6,534,000.00
90,750.00 108,900.00
60,500.00 72,700.00
62,400.00 63,000.00
34,800.00 36,000.00
42,200.00 43,000.00
56,100.00 56,500.00
62,400.00 63,000.00
685,000.00 750,000.00
275,000.00 280,000.00
181,800.00 199,900.00
242,000.00 266,200.00
318,200.00 350,000.00
32,800.00 36,000.00
90,800.00 99,800.00
181,500.00 199,600.00
206,500.00 227,500.00
79,000.00 86,900.00
11,000.00 12,100.00
28,200.00 31,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
60,000.00 66,000.00

750,000.00 825,000.00
1,050,000.00 1,155,000.00
2,250,000.00 2,475,000.00
135,000.00 148,500.00
50,000.00 55,000.00

200,000.00 250,000.00
250,000.00 250,000.00
500,000.00 500,000.00
750,000.00 750,000.00
1,000.00 1,500.00
150,000.00 175,000.00
150,000.00 250,000.00
750,000.00 825,000.00

22,000,000.00 24,200,000.00
15,000,000.00 16,500,000.00
2,200,000.00 2,420,000.00
2,500,000.00 2,750,000.00
2,200,000.00 2,420,000.00
400,000.00 440,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6

4,850.00 8,400.00
25,650.00 38,250.00
18,250.00 20,100.00
4,850.00 8,400.00
3,350.00 5,250.00
27,000.00 41,400.00
23,000.00 25,300.00
4,850.00 8,400.00
6,750.00 10,350.00
35,100.00 52,650.00
5,500.00 5,600.00
26,550.00 39,600.00

4,350.00 6,500.00
2,300.00 2,550.00
9,000.00 13,950.00
10,350.00 15,300.00
8,550.00 13,050.00
10,350.00 15,300.00
7,050.00 8,550.00
5,400.00 8,100.00
5,400.00 8,100.00
7,050.00 8,550.00
7,050.00 8,550.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
3,800.00 5,850.00
2,300.00 2,550.00
1,750.00 1,950.00
8,650.00 13,050.00
4,950.00 7,200.00
3,150.00 4,950.00
4,050.00 5,850.00
10,350.00 15,300.00
11,900.00 17,850.00
10,350.00 15,300.00
10,350.00 15,300.00
21,600.00 32,400.00
6,500.00 9,900.00
13,500.00 20,250.00
13,500.00 20,250.00
6,450.00 9,900.00
6,450.00 9,900.00
2,700.00 4,050.00
3,250.00 4,950.00
13,500.00 20,250.00
3,250.00 4,950.00
1,800.00 3,150.00
10,350.00 15,300.00
2,700.00 4,050.00

57,500.00 63,250.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
28,750.00 31,650.00
26,100.00 39,150.00
550.00 575,000.00
770.00 805,000.00
1,100,000.00 1,150,000.00
13,500.00 20,250.00
21,600.00 32,400.00
5,400.00 8,100.00
5,400.00 8,100.00
7,200.00 10,800.00
4,050.00 5,850.00
8,550.00 13,050.00
12,150.00 18,000.00
10,350.00 15,300.00
10,350.00 15,300.00
5,400.00 8,100.00
10,350.00 15,300.00
32,400.00 48,600.00
32,400.00 48,600.00
29,700.00 35,100.00
13,500.00 20,250.00
17,550.00 26,100.00
13,500.00 20,250.00
13,500.00 20,250.00
17,550.00 26,100.00
8,550.00 13,050.00
12,150.00 18,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
10,350.00 15,300.00
9,450.00 13,950.00
11,700.00 18,000.00
8,550.00 13,050.00
9,000.00 13,950.00
17,250.00 19,000.00
17,100.00 26,100.00
14,400.00 22,050.00
12,000.00 13,200.00
29,500.00 32,450.00
29,500.00 32,450.00
43,200.00 64,800.00
54,000.00 72,000.00

32,400.00 48,600.00
32,400.00 48,600.00
57,500.00 63,250.00
11,500.00 12,650.00
18,250.00 20,100.00
12,500.00 13,750.00
16,200.00 24,300.00
32,400.00 48,600.00
33,300.00 50,850.00
33,300.00 50,850.00
12,150.00 18,450.00
12,150.00 18,450.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
42,600.00 46,850.00
9,000.00 13,950.00
9,000.00 13,950.00
37,800.00 58,500.00
45,900.00 50,500.00
230,000.00 253,000.00
172,500.00 189,750.00
48,600.00 72,900.00
144,000.00 158,400.00
17,100.00 26,100.00
120,000.00 132,000.00
5,400.00 8,100.00
11,700.00 18,000.00
17,250.00 19,000.00
86,250.00 94,900.00
10,350.00 15,300.00
10,350.00 15,300.00
33,750.00 50,850.00
25,200.00 37,350.00
57,500.00 63,250.00
34,650.00 51,750.00
387,500.00 426,250.00
862,000.00 948,200.00
350,000.00 385,000.00
230,000.00 253,000.00
3,500.00 3,850.00
16,650.00 25,200.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
35,000.00 38,500.00
6,000.00 6,600.00
10,350.00 15,300.00
18,000.00 26,600.00
24,750.00 36,900.00
30,500.00 33,550.00
60,750.00 66,850.00
12,150.00 13,400.00
18,250.00 20,100.00
10,350.00 15,300.00
18,250.00 20,100.00
6,450.00 7,150.00
16,650.00 25,200.00
16,650.00 25,200.00
25,650.00 38,700.00
5,750.00 6,350.00
8,550.00 13,050.00
86,500.00 95,200.00
57,500.00 63,250.00
17,250.00
11,700.00 18,000.00
17,500.00 19,250.00
18,000.00 19,800.00
172,500.00 189,750.00
10,000.00 11,000.00
28,750.00 31,650.00
3,650.00 4,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
35,000.00 38,500.00
13,950.00 21,150.00
36,000.00 39,600.00
95,000.00 104,500.00
92,500.00 101,750.00
364,500.00 400,000.00
16,650.00 25,200.00
9,500.00 10,400.00
16,650.00 25,200.00
16,650.00 25,200.00
7,650.00 11,250.00
7,050.00 7,750.00
22,500.00 34,200.00
12,150.00 13,400.00
10,350.00 15,300.00
11,500.00 12,650.00
12,200.00 13,450.00
3,600.00 5,850.00
60,750.00 66,850.00
18,250.00 20,000.00
35,000.00 38,500.00
4,300.00 4,800.00
32,400.00 48,600.00
16,200.00 23,400.00
16,200.00 23,400.00
16,200.00 23,400.00
21,600.00 32,400.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
2,200.00 2,400.00
10,800.00 16,200.00
37,800.00 56,700.00
8,600.00 9,500.00

10,350.00 15,300.00
13,500.00 22,500.00
10,350.00 15,300.00
10,350.00 15,300.00
17,100.00 26,100.00
10,350.00 15,300.00
10,350.00 15,300.00
2,250.00 3,150.00
5,400.00 8,100.00
10,350.00 15,300.00
36,000.00 54,000.00
10,350.00 15,300.00
17,100.00 26,100.00
22,500.00 36,000.00
22,500.00 36,000.00
17,100.00 26,100.00

46,000.00 50,600.00
40,100.00 44,200.00
54,000.00 81,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
43,200.00 63,000.00
82,800.00 124,200.00
2,500.00 2,750.00

287,500.00 316,250.00
324,000.00 486,000.00
865,000.00 951,500.00
575,000.00 632,500.00
410,000.00 451,000.00
108,000.00 162,000.00
60,750.00 90,900.00
172,500.00 189,750.00
350,000.00 385,000.00
175,000.00 192,500.00
560,000.00 616,000.00
60,750.00 66,850.00
84,600.00 124,200.00
42,550.00 46,800.00
870,000.00 957,000.00
575,000.00 632,500.00
250,650.00 375,750.00
168,750.00 252,900.00
168,750.00 252,900.00

101,250.00 151,650.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
67,500.00 101,250.00
67,950.00 102,150.00
84,150.00 126,450.00

28,700.00 31,600.00
43,200.00 47,520.00
172,500.00 189,750.00
86,250.00 94,900.00
230,000.00 253,000.00
166,050.00 248,850.00
15,000.00 16,500.00
120,000.00 132,000.00
189,000.00 283,500.00
175,000.00 192,500.00
172,500.00 189,750.00
55,800.00 84,150.00
21,600.00 32,400.00
135,000.00 202,500.00
180,000.00 198,000.00
54,000.00 81,000.00
216,000.00 324,000.00
162,000.00 243,000.00
108,000.00 162,000.00
50,850.00 76,500.00
16,200.00 23,400.00
67,950.00 102,150.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
105,000.00 115,500.00
144,000.00 158,400.00
110,000.00 121,000.00
7,050.00 10,550.00
234,900.00 258,400.00
50,850.00 76,050.00
13,050.00 19,800.00
14,850.00 22,050.00
17,550.00 26,100.00
50,850.00 76,500.00
17,250.00 19,000.00
108,000.00 162,000.00
32,400.00 48,600.00
17,550.00 26,100.00
21,600.00 32,400.00
459,000.00 504,900.00
86,500.00 95,200.00
40,500.00 44,550.00
11,500.00 12,650.00
67,500.00 74,250.00
20,700.00 31,050.00
162,000.00 178,200.00
21,600.00 32,850.00
67,500.00 99,000.00
32,400.00 48,600.00
32,400.00 48,600.00
216,000.00 324,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
32,400.00 48,600.00
54,000.00 81,000.00
324,000.00 486,000.00
60,000.00 66,000.00
172,500.00 189,750.00
17,550.00 26,100.00

862,500.00 948,750.00
575,000.00 632,500.00
172,500.00 189,750.00
86,200.00 94,850.00
253,800.00 324,000.00
23,000.00 25,300.00
20,700.00 31,050.00
580,000.00 638,000.00
85,000.00 93,500.00
216,000.00 324,000.00
253,800.00 270,000.00
162,000.00 234,000.00
50,850.00 76,050.00
408,500.00 449,350.00
253,800.00 324,000.00
156,600.00 234,450.00
59,400.00 89,100.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
5,400.00 8,100.00
172,500.00 189,750.00
59,850.00 89,100.00
87,000.00 95,700.00
175,000.00 192,500.00
100,000.00 110,000.00
287,500.00 316,250.00
82,000.00 90,200.00

3,800.00 5,700.00
54,500.00 59,950.00
6,000.00 6,600.00
14,500.00 15,950.00
11,500.00 12,650.00
300,000.00 330,000.00
12,000.00 13,200.00
3,800.00 5,700.00
6,000.00 6,600.00
12,000.00 13,200.00
10,350.00 15,300.00
17,250.00 19,000.00
5,750.00 6,350.00

75,000.00 90,000.00
75,000.00 90,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
16,500.00 23,000.00
36,500.00 45,500.00
15,000.00 18,000.00
10,000.00 12,000.00
41,000.00 64,000.00
5,000.00 6,000.00
23,000.00 41,000.00
125,000.00 150,000.00
450,000.00 540,000.00
75,000.00 90,000.00
4,500.00 6,818.18
3,500,000.00 3,850,000.00
54,500.00 64,000.00
1,000.00 1,500.00
7,500.00 9,000.00

37,500.00 45,000.00
75,000.00 90,000.00
35,000.00 42,000.00
15,000.00 18,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
125,000.00 150,000.00
25,000.00 30,000.00
75,000.00 90,000.00
15,000.00 18,000.00

15,500.00 17,500.00
42,500.00 46,500.00
12,500.00 13,500.00
13,500.00 14,700.00
3,500.00 3,600.00
3,500.00 3,600.00

4,204,500.00 4,204,500.00
3,977,500.00 3,977,500.00
3,068,500.00 3,068,500.00
5,113,600.00 5,113,600.00
3,409,000.00 3,409,000.00
172,700.00 172,700.00
11,000.00 11,000.00
13,700.00 13,700.00
27,500.00 27,500.00
22,700.00 22,700.00
24,500.00 24,500.00
41,000.00 41,000.00
29,000.00 29,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
34,000.00 34,000.00
42,700.00 42,700.00
51,500.00 51,500.00
10,500.00 10,500.00
20,000.00 20,000.00
29,100.00 29,100.00
8,200.00 8,200.00
11,000.00 11,000.00
13,600.00 13,600.00
29,000.00 29,000.00
447,800.00 447,800.00
574,500.00 574,500.00
32,000.00 32,000.00
41,000.00 41,000.00
127,500.00 127,500.00
11,000.00 11,000.00
8,600.00 8,600.00
421,500.00 421,500.00
2,750.00 2,750.00
7,300.00 7,300.00
2,700.00 2,700.00
51,500.00 51,500.00
22,700.00 22,700.00
20,000.00 20,000.00
14,500.00 14,500.00
16,400.00 16,400.00
17,300.00 17,300.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
35,000.00 35,000.00
23,600.00 23,600.00
16,500.00 16,500.00
7,000.00 7,000.00
10,000.00 10,000.00
22,700.00 22,700.00
17,300.00 17,300.00
24,000.00 24,000.00
41,800.00 41,800.00
58,200.00 58,200.00
89,500.00 89,500.00
122,700.00 122,700.00
204,500.00 204,500.00
341,000.00 341,000.00
500,000.00 500,000.00
800,000.00 800,000.00
72,700.00 72,700.00
26,000.00 26,000.00
29,500.00 29,500.00
32,000.00 32,000.00
125,500.00 125,500.00
168,200.00 168,200.00
313,600.00 313,600.00
166,000.00 166,000.00
70,500.00 70,500.00
222,700.00 222,700.00
163,600.00 163,600.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
200,000.00 200,000.00
54,500.00 54,500.00
59,200.00 59,200.00
150,000.00 150,000.00
150,000.00 150,000.00
150,000.00 150,000.00
168,181.82 168,181.82
147,300.00 147,300.00
8,000.00 8,800.00
28,400.00 28,400.00
195,500.00 195,500.00
95,500.00 95,500.00
297,300.00 297,300.00
159,200.00 159,200.00
2,625,000.00 2,625,000.00
204,500.00 204,500.00
332,000.00 332,000.00
174,200.00 174,200.00
1,591,000.00 1,591,000.00
1,469,500.00 1,469,500.00
409,000.00 409,000.00
1,343,000.00 1,343,000.00
1,227,000.00 1,227,000.00
409,000.00 409,000.00
774,500.00 774,500.00
392,700.00 392,700.00
909,000.00 909,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
1,036,000.00 1,036,000.00
527,300.00 527,300.00
827,300.00 827,300.00
1,063,700.00 1,063,700.00
645,500.00 645,500.00
1,545,500.00 1,545,500.00
772,700.00 772,700.00
2,509,000.00 2,509,000.00
1,254,500.00 1,254,500.00
1,636,500.00 1,636,500.00
3,263,700.00 3,263,700.00
432,000.00 432,000.00
218,200.00 218,200.00
736,500.00 736,500.00
371,000.00 371,000.00
551,000.00 551,000.00
1,102,000.00 1,102,000.00
1,009,000.00 1,009,000.00
507,300.00 507,300.00
1,478,200.00 1,478,200.00
742,000.00 742,000.00
136,500.00 136,500.00
4,500.00 4,500.00
4,500.00 4,500.00
11,000.00 11,000.00
6,000.00 6,000.00
19,500.00 19,500.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
113,600.00 113,600.00
54,500.00 54,500.00
56,500.00 56,500.00
227,300.00 227,300.00
227,300.00 227,300.00
16,500.00 16,500.00
24,500.00 24,500.00
51,500.00 51,500.00
38,200.00 38,200.00
65,500.00 65,500.00
27,300.00 27,300.00
92,700.00 92,700.00
1,363,600.00 1,363,600.00
43,700.00 43,700.00
47,300.00 47,300.00
31,000.00 31,000.00
7,300.00 7,300.00
9,000.00 9,000.00
13,600.00 13,600.00
16,400.00 16,400.00
38,400.00 38,400.00
5,500.00 5,500.00
6,500.00 6,500.00
7,000.00 7,000.00
7,700.00 7,700.00
68,200.00 68,200.00
12,700.00 12,700.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
11,000.00 11,000.00
1,091,000.00 1,091,000.00
259,000.00 259,000.00
309,000.00 309,000.00
72,700.00 72,700.00
95,500.00 95,500.00
43,200.00 43,200.00
11,400.00 11,400.00
14,000.00 14,000.00
83,700.00 83,700.00
131,400.00 131,400.00
272,700.00 272,700.00
86,400.00 86,400.00
4,000.00 4,000.00
5,000.00 5,000.00
9,500.00 9,500.00
4,000.00 4,000.00
5,900.00 5,900.00
4,500.00 4,500.00
86,400.00 86,400.00
150,500.00 150,500.00
113,600.00 113,600.00
136,500.00 136,500.00
154,500.00 154,500.00
7,200.00 7,200.00
310,900.00 310,900.00
48,600.00 48,600.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
60,500.00 60,500.00
56,000.00 56,000.00
57,700.00 57,700.00
69,000.00 69,000.00
93,200.00 93,200.00
104,500.00 104,500.00
124,500.00 124,500.00
138,600.00 138,600.00
130,000.00 130,000.00
139,500.00 139,500.00
155,900.00 171,500.00
348,200.00 348,200.00
46,000.00 46,000.00
95,454.55 95,454.55
181,800.00 181,800.00
122,700.00 122,700.00
218,200.00 218,200.00
140,900.00 140,900.00
43,200.00 43,200.00
63,600.00 63,600.00
27,300.00 27,300.00
41,800.00 41,800.00
6,400.00 6,400.00
7,700.00 7,700.00
6,400.00 6,400.00
6,400.00 6,400.00
7,700.00 7,700.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
7,700.00 7,700.00
8,500.00 8,500.00
8,500.00 8,500.00
7,700.00 7,700.00
7,700.00 7,700.00
7,900.00 7,900.00
79,000.00 79,000.00
5,900.00 5,900.00
7,600.00 7,600.00
5,900.00 5,900.00
12,300.00 12,300.00
13,600.00 13,600.00
5,900.00 5,900.00
5,900.00 5,900.00
6,000.00 6,000.00
6,000.00 6,000.00
72,700.00 72,700.00
6,800.00 6,800.00
6,800.00 6,800.00
65,900.00 65,900.00
65,900.00 65,900.00
3,591,000.00 3,591,000.00
72,700.00 72,700.00
52,000.00 52,000.00
159,000.00 159,000.00
77,200.00 77,200.00
82,300.00 82,300.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
116,800.00 116,800.00
56,800.00 56,800.00
154,500.00 154,500.00
83,200.00 83,200.00
70,500.00 70,500.00
10,000.00 10,000.00
16,800.00 16,800.00
40,900.00 40,900.00
27,300.00 27,300.00
27,300.00 27,300.00
77,300.00 77,300.00
20,000.00 20,000.00
24,500.00 24,500.00
23,600.00 23,600.00
29,600.00 29,600.00
341,000.00 341,000.00
18,200.00 18,200.00
20,000.00 20,000.00
140,000.00 140,000.00
518,200.00 518,200.00
25,000.00 25,000.00
42,700.00 42,700.00
68,200.00 68,200.00
23,700.00 23,700.00
24,500.00 24,500.00
40,900.00 40,900.00
45,500.00 45,500.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
62,700.00 62,700.00
68,200.00 68,200.00
51,500.00 51,500.00
49,500.00 49,500.00
159,600.00 159,600.00
200,000.00 200,000.00
45,500.00 45,500.00
45,500.00 45,500.00
45,500.00 45,500.00
31,800.00 31,800.00
31,800.00 31,800.00
31,800.00 31,800.00
31,800.00 31,800.00
286,400.00 286,400.00
51,500.00 51,500.00
51,500.00 51,500.00
245,500.00 245,500.00
168,200.00 168,200.00
245,500.00 245,500.00
318,200.00 318,200.00
381,800.00 381,800.00
727,300.00 727,300.00
704,500.00 704,500.00
704,500.00 704,500.00
341,000.00 341,000.00
109,000.00 109,000.00
500,000.00 500,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
745,500.00 745,500.00
1,181,800.00 1,181,800.00
654,500.00 654,500.00
1,000,000.00 1,000,000.00
2,591,000.00 2,591,000.00
863,700.00 863,700.00
1,181,800.00 1,181,800.00
2,000,000.00 2,000,000.00
454,500.00 454,500.00
1,227,300.00 1,227,300.00
1,091,000.00 1,091,000.00
1,545,500.00 1,545,500.00
363,700.00 363,700.00
159,000.00 159,000.00
15,563,600.00 15,563,600.00
18,881,800.00 18,881,800.00
22,136,400.00 22,136,400.00
28,410,000.00 28,410,000.00
28,910,000.00 28,910,000.00
231,800.00 231,800.00
21,818,000.00 21,818,000.00
3,181,000.00 3,181,000.00
3,636,000.00 3,636,000.00
4,545,000.00 4,545,000.00
5,636,000.00 5,636,000.00
2,900,000.00 2,900,000.00
3,636,000.00 3,636,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
1,818,000.00 1,818,000.00
29,500.00 29,500.00
31,800.00 31,800.00
33,600.00 33,600.00
38,200.00 38,200.00
39,000.00 39,000.00
39,000.00 39,000.00
54,500.00 54,500.00
100,000.00 100,000.00
24,500.00 24,500.00
136,500.00 136,500.00
25,500.00 25,500.00
200,000.00 200,000.00
50,000.00 50,000.00
9,000.00 9,000.00
319,500.00 319,500.00
5,000.00 5,000.00
16,800.00 16,800.00
26,000.00 26,000.00
6,800.00 6,800.00
14,500.00 14,500.00
59,000.00 59,000.00
52,500.00 52,500.00
12,700.00 12,700.00
14,500.00 14,500.00
121,000.00 121,000.00
13,600.00 13,600.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
159,000.00 159,000.00
68,200.00 68,200.00
59,000.00 59,000.00
91,000.00 91,000.00
5,900.00 5,900.00
77,300.00 77,300.00
81,800.00 81,800.00
95,500.00 95,500.00
3,200.00 3,200.00
3,200.00 3,200.00
16,400.00 16,400.00
12,700.00 12,700.00
13,600.00 13,600.00
204,500.00 204,500.00
272,700.00 272,700.00
100,000.00 100,000.00
104,500.00 104,500.00
83,200.00 83,200.00
5,500.00 5,500.00
5,500.00 5,500.00
16,400.00 16,400.00
51,200.00 51,200.00
81,800.00 81,800.00
79,000.00 79,000.00
55,500.00 55,500.00
6,800.00 6,800.00
7,300.00 7,300.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
11,400.00 11,400.00
9,500.00 9,500.00
22,700.00 22,700.00
29,000.00 29,000.00
8,000.00 8,000.00
454,500.00 454,500.00
259,000.00 259,000.00
4,500.00 4,500.00
11,400.00 11,400.00
5,900.00 5,900.00
13,700.00 13,700.00
16,000.00 16,000.00
7,300.00 7,300.00
18,200.00 18,200.00
7,700.00 7,700.00
43,200.00 43,200.00
45,500.00 45,500.00
191,800.00 191,800.00
81,800.00 81,800.00
136,400.00 136,400.00
127,300.00 127,300.00
35,500.00 35,500.00
25,000.00 25,000.00
38,600.00 38,600.00
41,000.00 41,000.00
104,500.00 104,500.00
163,700.00 163,700.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
191,000.00 191,000.00
86,400.00 86,400.00
91,000.00 91,000.00
100,000.00 100,000.00

363,700.00 363,700.00
645,500.00 645,500.00
2,091,000.00 2,091,000.00
113,650.00 125,000.00
113,700.00 113,700.00
63,700.00 63,700.00
1,091,000.00 1,091,000.00
100,000.00 100,000.00
77,300.00 77,300.00
104,500.00 104,500.00
77,300.00 77,300.00
113,600.00 113,600.00
767,300.00 767,300.00
56,800.00 56,800.00
1,318,000.00 1,318,000.00
2,818,200.00 2,818,200.00
2,400,000.00 2,400,000.00
3,309,000.00 3,309,000.00
1,636,400.00 1,636,400.00
22,700.00 22,700.00
13,909,000.00 15,300,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6

431,800.00 431,800.00
181,800.00 181,800.00
89,500.00 89,500.00
67,300.00 67,300.00
186,400.00 186,400.00
1,591,000.00 1,591,000.00
195,500.00 195,500.00
1,386,400.00 1,386,400.00
223,700.00 223,700.00
38,700.00 38,700.00

681,800.00 681,800.00
1,000,000.00 1,000,000.00
447,300.00 447,300.00
447,300.00 447,300.00
50,000.00 55,000.00
8,272,800.00 8,272,800.00
5,545,500.00 5,545,500.00
227,300.00 250,000.00
3,181,800.00 3,181,800.00
218,200.00 240,000.00
3,181,800.00 3,181,800.00
2,727,300.00 2,727,300.00
22,181,800.00 22,181,800.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
4,991,000.00 4,991,000.00
7,727,300.00 7,727,300.00
7,272,700.00 7,272,700.00
223,700.00 223,700.00
223,700.00 223,700.00
223,700.00 223,700.00
1,136,400.00 1,136,400.00
2,000,000.00 2,000,000.00
5,545,500.00 5,545,500.00
7,763,700.00 7,763,700.00
559,000.00 559,000.00
894,500.00 894,500.00
2,994,500.00 2,994,500.00
3,327,300.00 3,327,300.00
199,000.00 219,000.00
9,545,500.00 9,545,500.00
1,363,600.00 1,363,600.00
45,500.00 45,500.00
68,200.00 68,200.00
78,200.00 78,200.00
4,545,500.00 4,545,500.00
6,136,400.00 6,136,400.00
28,200.00 28,200.00
2,772,700.00 2,772,700.00
3,327,300.00 3,327,300.00
5,545,500.00 5,545,500.00
1,220,000.00 1,220,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
1,608,200.00 1,608,200.00
1,852,200.00 1,852,200.00
654,000.00 654,000.00
986,400.00 986,400.00
1,651,800.00 1,651,800.00
614,500.00 614,500.00
947,700.00 947,700.00
1,386,400.00 1,386,400.00
721,000.00 721,000.00
3,818,200.00 3,818,200.00

1,300,000.00 1,950,000.00
1,100,000.00 1,650,000.00
2,600,000.00 3,900,000.00
900,000.00 1,350,000.00
1,600,000.00 2,400,000.00
325,000.00 487,500.00
600,000.00 900,000.00
15,000,000.00 16,500,000.00
16,000,000.00 17,600,000.00
14,000,000.00 15,400,000.00
200,000.00 300,000.00
200,000.00 300,000.00
300,000.00 450,000.00
900,000.00 1,350,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
1,000,000.00 1,500,000.00
800,000.00 1,200,000.00
1,300,000.00 1,950,000.00

9,000,000.00 13,500,000.00
1,800,000.00 2,700,000.00
350,000.00 525,000.00
250,000.00 375,000.00
3,000,000.00 4,500,000.00
2,500,000.00 3,750,000.00
2,000,000.00 3,000,000.00
26,000,000.00 39,000,000.00
3,000,000.00 4,500,000.00

2,000,000.00 3,500,000.00
3,000,000.00 4,500,000.00
1,900,000.00 2,850,000.00
2,000,000.00 3,000,000.00
2,700,000.00 4,050,000.00
3,500,000.00 5,250,000.00
1,500,000.00 3,000,000.00
2,600,000.00 3,900,000.00
5,000,000.00 7,500,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
450,000.00 675,000.00
1,500,000.00 2,250,000.00
3,400,000.00 5,100,000.00
2,800,000.00 4,200,000.00
3,500,000.00 5,250,000.00

1,000,000.00 1,100,000.00
5,500,000.00 6,050,000.00
3,500,000.00 3,850,000.00

11,000,000.00 16,500,000.00
950,000.00 1,425,000.00

350,000.00 525,000.00
300,000.00 450,000.00
1,200,000.00 1,800,000.00
400,000.00 600,000.00
800,000.00 1,200,000.00

2,000,000.00 3,000,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
2,250,000.00 3,375,000.00
1,500,000.00 2,250,000.00
1,000,000.00 1,500,000.00
1,500,000.00 2,250,000.00

25,000.00 37,500.00
25,000.00 37,500.00
4,000,000.00 6,000,000.00
3,750,000.00 5,625,000.00
7,000,000.00 10,500,000.00
3,500,000.00 5,250,000.00

2,500,000.00 2,750,000.00
1,600,000.00 1,760,000.00
2,250,000.00 2,475,000.00
200,000.00 220,000.00

245,000.00 400,000.00
275,000.00 400,000.00
300,000.00 450,000.00
400,000.00 600,000.00
200,000.00 400,000.00
300,000.00 500,000.00
2,750,000.00 4,125,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
3,000,000.00 4,500,000.00
1,900,000.00 2,850,000.00
4,000,000.00 6,000,000.00
3,750,000.00 5,625,000.00
4,000,000.00 6,000,000.00
7,000,000.00 10,500,000.00
6,000,000.00 9,000,000.00

1,350,000.00 2,025,000.00
1,250,000.00 1,875,000.00
2,600,000.00 3,900,000.00
1,075,000.00 1,612,500.00
1,200,000.00 1,800,000.00
1,800,000.00 2,700,000.00
600,000.00 900,000.00
250,000.00 400,000.00
100,000.00 150,000.00
700,000.00 1,050,000.00

400,000.00 600,000.00
300,000.00 450,000.00
400,000.00 600,000.00
1,750,000.00 2,625,000.00
700,000.00 1,050,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
8,000,000.00 12,000,000.00

250,000.00 400,000.00
250,000.00 400,000.00
1,300,000.00 1,950,000.00
16,500,000.00 24,750,000.00
3,500,000.00 6,000,000.00
3,000,000.00 4,500,000.00
1,100,000.00 1,650,000.00
2,500,000.00 3,750,000.00
1,300,000.00 1,950,000.00
2,500,000.00 4,000,000.00
2,600,000.00 3,900,000.00
2,900,000.00 4,350,000.00
3,000,000.00 4,500,000.00
4,500,000.00 6,750,000.00
6,000,000.00 9,000,000.00
10,000,000.00 15,000,000.00
1,250,000.00 1,875,000.00

100,000.00 150,000.00
100,000.00 150,000.00
150,000.00 225,000.00
175,000.00 262,500.00
205,000.00 307,500.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
435,000.00 652,500.00
750,000.00 1,125,000.00
435,000.00 562,500.00
1,675,000.00 2,512,500.00
7,800,000.00 11,700,000.00
925,000.00 1,387,500.00
190,000.00 285,000.00
420,000.00 630,000.00
1,375,000.00 2,062,500.00
650,000.00 975,000.00
35,000,000.00 52,500,000.00
15,000.00 22,500.00
810,000.00 1,215,000.00
920,000.00 1,380,000.00
175,000.00 262,500.00
120,000.00 180,000.00
1,750,000.00 3,000,000.00
790,000.00 1,185,000.00
1,575,000.00 2,362,500.00
735,000.00 1,102,500.00
3,800,000.00 5,700,000.00
1,200,000.00 1,800,000.00
1,350,000.00 2,025,000.00
925,000.00 1,387,500.00
450,000.00 675,000.00
1,700,000.00 2,550,000.00
35,000.00 52,500.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
730,000.00 1,095,000.00
620,000.00 930,000.00
135,000.00 202,500.00
375,000.00 562,500.00
205,000.00 307,500.00
105,000.00 157,500.00
90,000.00 135,000.00
80,000.00 120,000.00
70,000.00 105,000.00
60,000.00 90,000.00
50,000.00 75,000.00
55,000.00 82,500.00
55,000.00 82,500.00
60,000.00 90,000.00
1,510,000.00 2,265,000.00
1,510,000.00 2,265,000.00
1,715,000.00 2,572,500.00
670,000.00 1,005,000.00
700,000.00 1,050,000.00
510,000.00 765,000.00
525,000.00 787,500.00
300,000.00 450,000.00
280,000.00 420,000.00
220,000.00 330,000.00
12,000.00 18,000.00
45,000.00 67,500.00
11,000,000.00 16,500,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
4,000,000.00 6,000,000.00
235,000.00 352,500.00
715,000.00 1,072,500.00
725,000.00 1,087,500.00
1,760,000.00 2,640,000.00
210,000.00 315,000.00
215,000.00 322,500.00

475,000.00 712,500.00
625,000.00 937,500.00
360,000.00 540,000.00
500,000.00 750,000.00
1,200,000.00 1,800,000.00
900,000.00 1,350,000.00
150,000.00 225,000.00
260,000.00 390,000.00
350,000.00 637,500.00
150,000.00 225,000.00
175,000.00 262,500.00
1,025,000.00 1,537,500.00

220,000.00 330,000.00
900,000.00 1,350,000.00
11,500,000.00 17,250,000.00
240,000.00 360,000.00

CK: BM: TRTB: DKP: Air:


HARGA NON PAJAK
HARGA HARGA KET.
DAERAH DATAR DAERAH PEGUNUNGAN
( Rp ) ( Rp )
4 5 6
240,000.00 360,000.00
440,000.00 660,000.00
1,225,000.00 1,837,500.00
450,000.00 675,000.00
135,000.00 202,500.00
475,000.00 712,500.00
300,000.00 450,000.00
820,000.00 1,230,000.00
710,000.00 1,065,000.00
2,600,000.00 3,900,000.00
5,000,000.00 9,750,000.00
2,500,000.00 3,750,000.00
1,800,000.00 2,700,000.00
2,100,000.00 3,150,000.00
1,200,000.00 1,800,000.00
1,000,000.00 1,500,000.00
1,100,000.00 1,650,000.00
2,600,000.00 3,900,000.00
1,300,000.00 1,950,000.00
1,350,000.00 2,025,000.00
1,900,000.00 2,850,000.00
7,500,000.00 11,250,000.00
70,000.00 105,000.00
200,000.00 300,000.00
175,000.00 262,500.00

CK: BM: TRTB: DKP: Air:


PENENTUAN HSPK PADA DINAS PEKERJAAN UMUM - BINA MARGA DAN CIPTA KARYA
TAHUN ANGGARAN 2013 TRIWULAN I KABUPATEN TULUNGAGUNG

HARGA BAWAH HARGA ATAS


NO URAIAN KEGIATAN SATUAN KET.
( Rp ) ( Rp )
1 2 3 4 5 6

I. UPAH
1 Tukang kayu 1 Oh 57,500.00 57,500.00
2 Tukang batu 1 Oh 57,500.00 57,500.00
3 Tukang besi 1 Oh 57,500.00 57,500.00
4 Tukang cat 1 Oh 57,500.00 57,500.00
5 Kepala Tukang 1 Oh 62,500.00 62,500.00
6 Pekerja / Buruh tak terlatih 1 Oh 45,000.00 45,000.00
7 Mandor 1 Oh 68,000.00 68,000.00
8 Mekanik semi terlatih 1 Oh 47,500.00 47,500.00
9 Buruh terlatih 1 Oh 50,000.00 50,000.00
10 Buruh semi terlatih 1 Oh 47,500.00 47,500.00
11 Operator terlatih 1 Oh 60,000.00 60,000.00
12 Operator semi terlatih 1 Oh 50,000.00 50,000.00
13 Pembantu operator 1 Oh 45,000.00 45,000.00
14 Sopir 1 Oh 55,000.00 55,000.00
15 Mekanik terlatih 1 Oh 55,000.00 55,000.00
16 Pembantu Sopir 1 Oh 45,000.00 45,000.00
17 Kernet 1 Oh 45,000.00 45,000.00
18 Penjaga 1 Oh 45,000.00 45,000.00
19 Pengayam 1 Oh 45,000.00 45,000.00
- - -
II. BAHAN LOKAL - - -
1 Air bersih Lt 66.00 70.00
2 Alat - alat kerja Set 125,000.00 135,000.00
3 Arang kayu Kg 3,000.00 3,000.00
4 Atap Sirap ( Kayu Ulin ) M2 115,000.00 120,000.00
5 Bak cuci traso Bh 185,000.00 190,000.00
6 Bak Mandi teraso Bh 100,000.00 110,000.00
7 Bambu dia 6 - 8 cm, panjang 6 m Btg 10,000.00 12,500.00
8 Bataco Bh 2,400.00 2,500.00
9 Batang kelapa dia 30 cm M' 30,000.00 30,000.00
10 Batu marmo warna M2 90,000.00 125,000.00
11 Batu amyang Kg 1,900.00 2,800.00
12 Batu andesit 30 x 30 cm M2 152,000.00 155,000.00
13 Batu Andesit alur M2 191,500.00 195,000.00
14 Batu Andesit Alur hitam M2 192,000.00 195,000.00
15 Batu andesit hitam bakar uk. 20 /20 (tidak dipoles ) M2 152,000.00 155,000.00
16 Batu andesit hitan uk. 30 x 30 cm ( dipoles) M2 198,000.00 205,000.00
17 Batu Andisit Hijau M2 146,000.00 150,000.00
18 Batu apung 3 - 5 cm M3 243,000.00 267,300.00
19 Batu Bata / Merah Bj 600.00 700.00
20 Batu belah, uk. 8/10 cm M3 160,000.00 175,000.00
21 Batu belah,Uk.10-15 Cm & 15 - 20 cm M3 150,000.00 165,000.00
22 Batu Bobos M2 99,000.00 100,000.00
23 Batu candi M2 106,000.00 110,000.00

1
1 2 3 4 5 6
24 Batu candi hitam M2 106,000.00 110,000.00
25 Batu granit black gold M2 1,363,700.00 1,409,100.00
26 Batu granit motif M2 165,000.00 170,000.00
27 Batu guary/batu besar ( uk. Crussher) M3 141,000.00 154,600.00
28 Batu koral putih M2 137,500.00 140,000.00
29 Batu koral warna M2 143,000.00 145,000.00
30 Batu lempeng M2 82,500.00 88,000.00
31 Batu marmo biasa M2 65,500.00 81,900.00
32 Batu paras putih M2 825,000.00 830,000.00
33 Batu paras grobongan M2 82,500.00 85,000.00
34 Batu pecah 0,5-1 cm M3 260,000.00 290,000.00
35 Batu pecah 1-2 cm M3 255,000.00 285,000.00
36 Batu pecah 2-3 cm M3 230,000.00 260,000.00
37 Batu pecah 3-5 cm M3 200,000.00 225,000.00
38 Batu pecah 5-7 cm M3 165,000.00 185,000.00
39 Batu plontos 5/7 cm M3 156,400.00 177,300.00
40 Batu putih / gunung M3 125,000.00 135,000.00
41 Batu putih pecah , 5 - 7 cm M3 135,000.00 145,000.00
42 Batu quary/batu besar ( uk. Crasher ) M3 118,200.00 145,500.00
43 Batu Salagedang M2 92,500.00 95,000.00
44 Batu susun sirih M2 231,000.00 240,000.00
45 Batu Volcano 3-5 cm M3 331,400.00 364,500.00
46 Batu warna ( hias ) Zak 80,000.00 82,500.00
47 Betek / sesek kasar M2 11,000.00 12,000.00
48 Beton Rooster Lokal abu - abu Uk. 40 x 20 cm M2 112,500.00 115,000.00
49 Beton Rooster Lokal warna 12 x 24 cm M2 119,000.00 121,000.00
50 Bilik bambu M2 4,000.00 5,000.00
51 Buis Beton 1/2 ø 20 Cm M' 17,500.00 19,000.00
52 Buis Beton 1/2 ø 30 Cm M' 28,000.00 35,000.00
53 Buis Beton 1/2 ø 40 Cm M' 30,000.00 35,000.00
54 Buis Beton ø 100 Cm M' 192,000.00 204,600.00
55 Buis Beton ø 20 Cm M' 25,500.00 31,900.00
56 Buis Beton ø 30 Cm M' 40,000.00 47,500.00
57 Buis Beton ø 40 Cm M' 47,500.00 55,000.00
58 Buis Beton ø 50 Cm M' 75,000.00 80,000.00
59 Buis Beton ø 60 Cm M' 80,000.00 90,000.00
60 Buis Beton ø 80 Cm M' 110,000.00 115,000.00
61 Dolken bambu panjang 3 m Btg 25,000.00 25,000.00
62 Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m Btg 142,000.00 150,000.00
63 Genteng Bubung MKP Bh 4,200.00 4,500.00
64 Genteng MKP Bh 1,500.00 1,600.00
65 Genteng Beton Bh 3,700.00 3,800.00
66 Genteng bubung beton Bh 6,600.00 6,700.00
67 Genteng gelombang Bh 1,800.00 2,000.00
68 Genteng mantili Bh 1,600.00 1,700.00
69 Genteng pres biasa Bh 1,300.00 1,400.00
70 Grasak M3 125,000.00 150,000.00
71 Ijuk Kg 5,000.00 5,500.00
72 Kapur Batu M3 436,400.00 545,500.00
73 Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting Btg 16,000.00 21,000.00
74 Kayu bakar M3 175,000.00 175,000.00
75 Kayu Balau Balok M3 9,600,000.00 9,800,000.00

2
1 2 3 4 5 6
76 Kayu Balau Papan M3 10,100,000.00 10,300,000.00
77 Kayu bekisting M3 2,500,000.00 2,600,000.00
78 Kayu Jati Balok eks. Bojonegoro M3 23,181,900.00 23,409,100.00
79 Kayu Jati Balok lokal M3 19,200,000.00 20,000,000.00
80 Kayu Jati Papan eks. Bojonegoro M3 30,909,100.00 31,363,700.00
81 Kayu jati papan lokal M3 19,800,000.00 20,454,600.00
82 Kayu Kamper Balok M3 10,200,000.00 10,450,000.00
83 Kayu Kamper papan M3 10,700,000.00 10,900,000.00
84 Kayu kelapa / glugu 8/10 cm M' 16,000.00 16,000.00
85 Kayu kelapa / glugu usuk 4/6 cm M' 3,500.00 3,500.00
86 Kayu Kempas Balok M3 7,800,000.00 8,000,000.00
87 Kayu Kempas Papan M3 8,300,000.00 8,500,000.00
88 Kayu Kruing Balok M3 7,800,000.00 8,000,000.00
89 Kayu Kruing Papan M3 8,300,000.00 8,500,000.00
90 Kayu Meranti Balok M3 5,400,000.00 5,600,000.00
91 Kayu Meranti Papan M3 5,900,000.00 6,100,000.00
92 Kayu Tahun Balok ( Mauni/ Akasia ) M3 4,200,000.00 4,250,000.00
93 Kayu Tahun papan ( Mauni/akasia) M3 4,500,000.00 4,545,500.00
94 Kerikil halus 0.4 / 0.4 (hitam ) Kg 4,000.00 4,500.00
95 Kerikil halus 0.4 / 0.4 (putih ) Kg 2,700.00 3,000.00
96 Kerikil halus 0.4 x 0.4 ( hijau) Kg 1,200.00 1,500.00
97 List Eternit ( kayu ) M' 3,000.00 3,100.00
98 Marmer bakar M2 99,000.00 100,000.00
99 Marmer Hitam M2 200,000.00 210,000.00
100 Marmer Putih M2 172,000.00 175,000.00
101 Marmer Slab lebar (1.8x2.40) m M2 318,200.00 327,300.00
102 Ornamen 30 x 30 cm Bj 66,000.00 70,000.00
103 Pasir pasang / beton M3 120,000.00 200,000.00
104 Pasir Urug M3 54,600.00 77,300.00
105 Paving Stone / conblok (10x10) 5 warna M2 65,000.00 70,000.00
106 Paving Stone / Conblok abu - abu tebal 8 cm, K225 M2 52,800.00 55,800.00
107 Paving Stone / Conblok abu - abu tebal 6 cm, K225 M2 47,000.00 51,700.00
108 Paving Stone / Conblok abu - abu tebal 6 cm, K300 M2 50,000.00 55,000.00
109 Paving Stone / Conblok abu - abu tebal 6 cm, K400 M2 53,000.00 58,300.00
110 Paving Stone / Conblok abu - abu tebal 8 cm, K300 M2 55,000.00 56,000.00
111 Paving Stone / Conblok abu - abu tebal 8 cm, K400 M2 58,000.00 59,000.00
112 Paving Stone / Conblok abu - abu tebal 6 cm M2 34,000.00 37,000.00
113 Paving StonE / Conblok abu - abu tebal 8 cm M2 36,000.00 39,000.00
114 Paving Stone / Conblok warna tebal 6 cm, K225 M2 54,000.00 57,000.00
115 Paving Stone / Conblok warna tebal 8 cm, K225 M2 59,000.00 62,000.00
116 Rambu lalu lintas Bh 300,000.00 300,000.00
117 Rooster/ Terawang Bh 8,500.00 9,350.00
118 Semen Merah M3 119,000.00 135,000.00
119 Sirtu royalti M3 95,500.00 118,200.00
120 Sirtu Urug M3 90,000.00 155,000.00
121 Skampal Bh 125,000.00 125,000.00
122 Susun Sirih, andisit hitam uk. 3 x 20 cm M2 165,000.00 170,000.00
123 Susun Sirih, andisit hitam uk. 3 x 30 cm M2 165,000.00 170,000.00
124 Susun Sirih, andisit hitam uk. 3 x 40 cm M2 181,500.00 187,000.00
125 Tali ijuk Kg 9,000.00 9,100.00
126 Tanah liat M3 41,000.00 50,000.00
127 Tanah urug M3 50,000.00 50,000.00

3
1 2 3 4 5 6
128 Ubin Abu-abu Uk. 20Cm x 20Cm M2 27,500.00 30,000.00
129 Ubin Teraso Uk 30 Cm x 30 Cm M2 47,500.00 50,000.00
130 Ubin Wafel Uk 20Cm x 20Cm M2 40,000.00 42,500.00
131 Urugan Taman M3 85,000.00 85,000.00

- - -

4
1 2 3 4 5 6
III. BAHAN PABRIKAN - - -
1 Adaptor Ǿ 2" Bh 75,000.00 90,000.00
2 Adaptor Ǿ 3" Bh 108,500.00 130,700.00
3 Adaptor Ǿ 4" Bh 108,500.00 150,000.00
4 Alumunium foil M2 9,900.00 10,000.00
5 Angker dia 25 mm P 50 cm Bh 60,500.00 72,700.00
6 Arde Bh 181,500.00 217,800.00
7 Asbes Gelombang Besar Uk. 300 x 105 x0,4 Cm Lbr 66,000.00 67,000.00
8 Asbes Gelombang Kecil Uk. 1.80 x 105 x0,4 Cm Lbr 40,800.00 42,000.00
9 Harga aspal untuk kontruksi - - -
a. a. Aspal Kemas Kg 10,750.00 10,750.00
b. b. Aspal Curah Kg 10,000.00 10,000.00
10 Harga Pengadaan Aspal - - -
a. a. Aspal Kemas Kg 10,750.00 10,750.00
b. Aspal curah Kg 8,750.00 8,750.00
13 Aquaproof Kg 45,500.00 50,000.00
14 Atap Policarbonat stainlees steel M2 561,000.00 589,000.00
15 Atap policarbonat besi M2 396,000.00 415,800.00
16 Atap Policarbonat minimalis M2 790,000.00 830,000.00
17 Atap Skylight / fiber M2 220,000.00 225,000.00
18 Avor plastik / floor drain Bh 9,000.00 9,400.00
19 Avor staninlees steel Bh 15,000.00 15,800.00
20 Awning M2 365,000.00 384,000.00
21 Baja Profil Kg 13,000.00 13,000.00
22 Baja siku Kg 11,000.00 11,000.00
23 Baja,paku-paku jembatan,besi beton Kg 10,500.00 10,500.00
24 Bak Cuci Stainlesstel (Royal) M2 183,000.00 193,000.00
25 Bak Cuci Tangan Wastafel Bh 225,000.00 230,000.00
26 Bak Kip Bh 1,275,000.00 1,300,000.00
27 Bak Mandi Fiber glass, 0.3 m3 Bh 65,000.00 70,000.00
28 Bak Mandi Fiber glass, 1.00 m x 1.00 m Bh 210,000.00 220,000.00
29 Bak mandi teraso volume 0.3 m3 Bh 165,000.00 170,000.00
30 Bend All Flange 22.5 GI dia 4" Bh 108,900.00 130,800.00
31 Bend GI. Dia 2" Bh 53,870.00 59,500.00
32 Bend PVC Ǿ 1 1/2" Bh 45,000.00 49,500.00
33 Bend PVC Ǿ 1" Bh 30,500.00 36,500.00
34 Bend PVC Ǿ 2" Bh 48,400.00 58,100.00
35 Bend PVC Ǿ 3" Bh 65,000.00 71,500.00
36 Bend PVC Ǿ 4" Bh 78,600.00 86,500.00
37 Bensin Non Subsidi pemerintah Ltr 11,000.00 12,100.00
38 Bensin Subsidi pemerintah Ltr 4,500.00 5,000.00
39 Besi Beton / tulangan beton Kg 11,000.00 11,000.00
40 Besi Beugel/Baut Kg 16,400.00 17,300.00
41 Besi pengaman pipa dia 12 mm Unit 181,500.00 217,900.00
42 Besi plat Kg 12,000.00 12,000.00
43 Biaya Penyambungan dan Uji PLN Titik 43,923,000.00 52,707,600.00
44 Boull Valve Bh 28,400.00 31,200.00
45 Box Meter Bh 40,300.00 44,300.00
46 BPU VA 640,500.00 704,600.00
47 Bubung asbes gel besar ( Ardek 1Stel 2 Lmbr ) Stel 46,200.00 47,000.00
48 Bubung asbes gel kecil ( Ardek 1Stel 2 Lmbr ) Stel 29,000.00 30,000.00
49 Calsy bord ( uk. 122 x x 244 x 0.3 cm Lbr 63,000.00 66,100.00

5
1 2 3 4 5 6
50 Cassing Pompa PVC dia 10" S 10 Bh 2,722,500.00 3,267,000.00
51 Cat besi Kg 42,000.00 42,000.00
52 Cat genteng Kg 54,000.00 57,000.00
53 Cat term Kg 40,000.00 40,000.00
54 Cat Dasar wheathershield Kg 72,800.00 80,000.00
55 Cat Kayu Emco Kg 50,000.00 50,000.00
56 Cat Meny besi Kg 15,000.00 15,000.00
57 Cat Meny kayu Kg 15,300.00 15,800.00
58 Cat Tembok Kg 20,000.00 22,000.00
59 Cat Tembok exterior wheathershield Kg 78,000.00 82,000.00
60 Cat Tembok interior premium Kg 59,000.00 62,000.00
61 Chek Valve Ǿ 2 1/2" Bh 847,000.00 1,050,000.00
62 Chek Valve Ǿ 3" Bh 907,500.00 1,100,000.00
63 Chek Valve Ǿ 4" Bh 1,210,000.00 1,500,000.00
64 Chek Valve Ǿ 6" Bh 1,430,000.00 1,600,000.00
65 Chek Valve Ǿ 8" Bh 2,050,000.00 2,300,000.00
66 Clamp penggantung lengkap Unit 30,300.00 36,300.00
67 Clear melamin impra dof / gloos Kg 43,200.00 45,300.00
68 Coatting Ltr 60,000.00 61,000.00
69 Daun jendela kaca aluminium 4" M2 420,000.00 441,000.00
70 Daun Jendela kaca aluminium YKK M3 850,000.00 892,500.00
71 Daun pintu Kaca pegas lengkap (kunci,engsel dan handle) Bh 4,620,000.00 4,851,000.00
72 Deap and assamble Bh 121,000.00 145,000.00
73 Dempul Kayu Kg 15,600.00 16,000.00
74 Dobel Nepel Ǿ 1/2" Bh 3,500.00 3,750.00
75 Doble Niple Ǿ 3" Bh 136,400.00 182,000.00
76 Dop GI dia 1" Bh 20,500.00 23,000.00
77 Dop GI dia 1.5" Bh 36,000.00 40,000.00
78 Dop GI dia 2" Bh 54,000.00 60,000.00
79 Dop GI dia 2.5" Bh 63,000.00 70,000.00
80 Dop GI dia 3" Bh 72,000.00 80,000.00
81 Dop GI dia 4" Bh 102,500.00 123,500.00
82 Dop PVC dia 1" Bh 16,500.00 18,500.00
83 Dop PVC dia 1.5" Bh 20,500.00 23,000.00
84 Dop PVC dia 2" Bh 24,500.00 27,500.00
85 Dop PVC dia 2.5" Bh 33,000.00 36,500.00
86 Dop PVC dia 3" Bh 41,000.00 45,500.00
87 Dop PVC dia 4" Bh 49,000.00 55,000.00
88 Double Kran Dupon Bh 237,000.00 249,000.00
89 Elektroda Kg 135,000.00 135,000.00
90 Engsel pintu kupu - kupu Bh 22,000.00 22,500.00
91 Engsel Jendela ( H ) Bh 6,600.00 6,700.00
92 Engsel Jendela (Arch ) Bh 6,000.00 6,500.00
93 Engsel Pintu ( H ) Bh 7,700.00 7,800.00
94 Engsel Pintu (Arch ) nylon Bh 9,000.00 9,500.00
95 Engsel sendok Bh 9,600.00 10,000.00
96 Engsel Stainlesstel Dekson 3" Bh 48,000.00 50,400.00
97 Engsel Stainlesstel Dekson 4" Bh 96,000.00 100,800.00
98 Engsel Stainlesstel Dekson 5" Bh 107,000.00 112,300.00
99 Eternit kembang M2 9,700.00 9,800.00
100 Eternit polos (Asbes) M2 9,600.00 9,700.00
101 Exhaust dinding Unit 318,200.00 381,900.00

6
1 2 3 4 5 6
102 Exhaust langit-langit 20/20 cm Unit 227,300.00 272,800.00
103 Exhaust langit-langit 25/25 cm Unit 363,700.00 436,400.00
104 Flange Las Dia 4" Bh 181,500.00 217,800.00
105 Flange Las Dia 8" Bh 410,000.00 455,000.00
106 Flange Las Dia Ǿ 3" Bh 151,200.00 181,500.00
107 Flange Las Dia Ǿ 6" Bh 286,500.00 315,000.00
108 Flange Socket dia 2" Bh 99,000.00 121,000.00
109 Flange Socket Ǿ 3" Bh 82,500.00 136,500.00
110 Flange Socket Ǿ 4" Bh 110,000.00 181,500.00
111 Formika Lbr 247,500.00 248,000.00
112 Gate Valve GI Ǿ 2" Bh 847,000.00 932,000.00
113 Gate Valve GI Ǿ 3" Bh 968,000.00 1,162,000.00
114 Gate Valve GI Ǿ 4" Bh 1,573,000.00 1,888,000.00
115 Gate Valve GI Ǿ 6" Bh 1,840,000.00 2,046,000.00
116 Gate Valve GI Ǿ 8" Bh 2,750,000.00 3,000,000.00
117 Genteng bubung beton Bh 6,600.00 6,700.00
118 Genteng Kaca Bh 7,700.00 7,800.00
119 Genteng Metal Lbr 115,000.00 120,000.00
120 GIP BSA diameter 1" M'/ psg 8,000.00 12,000.00
121 GIP BSA diameter 1,25" M'/ psg 9,000.00 13,500.00
122 GIP BSA diameter 2" M'/ psg 12,500.00 18,750.00
123 GIP BSA diameter 2,5" M'/ psg 15,000.00 22,500.00
124 GIP BSA diameter 3" M'/ psg 17,500.00 26,250.00
125 GIP BSA diameter 4" M'/ psg 21,000.00 31,500.00
126 GIP BSA diameter 1,5" M'/ psg 10,500.00 15,750.00
127 GIP BSA diameter 1/2" M'/ psg 4,000.00 6,000.00
128 GIP BSA diameter 3/4" M'/ psg 6,000.00 9,000.00
129 Glass bird Kg 44,600.00 45,500.00
130 Glass block Bj 21,000.00 22,000.00
131 Granit (ex Granito) tekstur Uk. 40x40 cm M2 201,000.00 212,000.00
132 Granit (ex Granito) tekstur Uk. 60x60 cm M2 286,000.00 301,000.00
133 Granit (ex Granito) warna gelap Uk. 40x40 cm M2 134,000.00 141,000.00
134 Granit (ex Granito) warna gelap Uk. 60x60 cm M2 231,000.00 243,000.00
135 Granit (ex Granito) warna terang Uk. 40x40 cm M2 122,000.00 129,000.00
136 Granit (ex Granito) warna terang Uk. 60x60 cm M2 207,000.00 218,000.00
137 Grendel jendela merk SES Bh 21,000.00 22,000.00
138 Grendel Pintu Panjang ( sespen ) Bh 12,100.00 12,200.00
139 Grendel pintu ganda Dekson 40 cm komplit Bh 118,000.00 123,900.00
140 Grendel tanam merk SES Set 52,800.00 55,400.00
141 Grill besi M2 318,200.00 341,000.00
142 Gypsum board ( 1,2 x 2,4 m ) Lbr 69,000.00 70,000.00
143 Hak Angin Set 9,900.00 10,000.00
144 Hak angin Merk SES Set 30,000.00 31,500.00
145 Handle Bh 2,420,000.00 2,904,000.00
146 Handle pintu ganda Dekson 30 cm komplit Set 553,000.00 580,700.00
147 Handle pintu ganda Dekson 40 cm komplit Set 590,000.00 619,500.00
148 Handle pintu stanless steel besar Psg 90,000.00 94,500.00
149 Handle pintu stanless steel kecil Bh 15,000.00 15,800.00
150 Harpleks ( Uk 40 .200. 04 ) Lbr 14,300.00 15,000.00
151 HCL / air keras Ltr 12,000.00 13,000.00
152 Kabel cocial M' 13,200.00 21,800.00
153 Kaca air 5 Cm M2 85,800.00 86,000.00

7
1 2 3 4 5 6
154 Kaca bluegreen t=8mm M2 681,900.00 691,000.00
155 Kaca patry M2 2,272,800.00 2,727,300.00
156 Kaca Bening Uk. 3 mm M2 52,800.00 53,000.00
157 Kaca Bening Uk. 5 mm M2 54,000.00 55,000.00
158 Kaca Bening Uk. 7 mm M2 136,400.00 163,700.00
159 Kaca Ray-band Uk. 5 mm M2 79,200.00 80,000.00
160 Kaca Ray-band Uk. 7 mm M2 159,100.00 191,000.00
161 Kaca Stained Glass M2 1,136,400.00 1,363,700.00
162 Kanstin (K225) uk. 40x20x10 cm M' 32,700.00 45,900.00
163 Kanstin (K225) uk. 40x20x15 cm M' 39,500.00 53,400.00
164 Karung plastik Bh 4,300.00 7,100.00
165 Kawat ayaman bronjong galvanis Kg 12,800.00 12,900.00
166 Kawat Beton / bendraat Kg 16,400.00 16,400.00
167 Kawat Duri M' 1,700.00 1,800.00
168 Kawat Harmonika M2 30,000.00 31,000.00
169 Kawat Nyamuk aluminium M2 7,200.00 7,300.00
170 Keni Drat Ǿ 1/2" Bh 1,200.00 1,300.00
171 Keni GI Ǿ 1/2" Bh 4,000.00 4,300.00
172 Keramik Arstistik Uk. 10 x 20 cm M' 84,000.00 85,000.00
173 Keramik cutting Uk. 30cm x 50 cm M2 98,000.00 103,000.00
174 Keramik cutting Uk. 31cm x 63 cm M2 165,000.00 174,000.00
175 Keramik dinding motif Uk. 20cm x 25 cm M2 44,000.00 47,000.00
176 Keramik dinding putih ukuran 20/25 Cm M2 43,000.00 46,000.00
177 Keramik dinding Uk. 20cm x 33 cm M2 59,000.00 62,000.00
178 Keramik motif Uk. 30 cm x 30 cm M2 38,000.00 40,000.00
179 Keramik motif Uk. 40 cm x 40 cm M2 44,000.00 47,000.00
180 Keramik motif Uk. 50 cm x 50 cm M2 76,400.00 81,900.00
181 Keramik putih Uk. 30 cm x 30 cm M2 30,000.00 32,000.00
182 Keramik putih Uk. 40cm x 40 cm M2 36,000.00 38,000.00
183 Keramik tekstur cutting Uk. 31cm x 63 cm M2 183,000.00 193,000.00
184 Keramik tekstur Uk. 20cm x 20 cm M2 43,000.00 46,000.00
185 Keramik tekstur Uk. 30cm x 30 cm M2 49,000.00 52,000.00
186 Keramik Uk. 20Cm x 20Cm M2 40,800.00 41,000.00
187 Kertas gosok ( rempelas ) Lbr 2,400.00 3,000.00
188 Kipas Angin langit-langit Unit 397,800.00 477,300.00
189 Kisi - kisi almunium M2 462,000.00 485,100.00
190 Kisi - kisi almunium 4" M' 70,000.00 73,500.00
191 Kisi-kisi aluminium 3" M' 60,000.00 63,000.00
192 Klem Sadel 2" Bh 15,850.00 17,435.00
193 Klem Sadel 3" Bh 26,000.00 28,600.00
194 Klem Sadel 4" Bh 33,900.00 37,290.00
195 Kloset Duduk Keramik Bh 330,000.00 350,000.00
196 Kloset Duduk Keramik (komplit) Bh 1,100,000.00 1,250,000.00
197 Kloset Jongkok Keramik Bh 102,000.00 105,000.00
198 Kloset Jongkok teraso Bh 72,600.00 75,000.00
199 Kloset Monoblok Lokal Bh 960,000.00 975,000.00
200 Knee Drat PVC Ǿ 3/4" Bh 2,500.00 2,750.00
201 Knee GI dia 3" Bh 106,480.00 127,800.00
202 Knee GI dia 4" Bh 113,135.00 135,800.00
203 Knee GI Ǿ 2,5" Bh 76,780.00 127,800.00
204 Knee PVC Ǿ 3" Bh 15,000.00 16,500.00
205 Knee PVC Ǿ 3/4" Bh 2,500.00 2,750.00

8
1 2 3 4 5 6
206 Knee PVC Ǿ 4" Bh 16,000.00 17,600.00
207 Kompor Gas Bh 272,800.00 300,000.00
208 Kran cucian dia 3/4" Bh 48,000.00 50,400.00
209 Kran Dia 1/2 " Bh 14,400.00 23,800.00
210 Kran Dia 3/4 " Bh 19,800.00 32,700.00
211 Kran Dupon Bh 158,000.00 166,000.00
212 Kran Toto 1/2" Bh 241,000.00 250,000.00
213 Kuas Eterna 4 " Bj 11,000.00 11,900.00
214 Kunci tanam merk SES ( pelor ) Bh 145,200.00 152,500.00
215 Large angle Bh 151,300.00 181,500.00
216 Lem ( Kayu + Tembok ) Kg 11,000.00 12,000.00
217 Lem PVC Kg 27,500.00 30,250.00
218 List Profil besar ( gypsum ) M' 26,500.00 27,000.00
219 List Profil kecil ( gypsum ) M' 16,500.00 17,000.00
220 Man hole (tutup plat besi 0.5 x 0.5) Unit 399,300.00 479,200.00
221 Manometer Bh 544,500.00 653,400.00
222 Manometer Kecil Bh 227,300.00 250,000.00
223 Mesin Diesel 5 HP / 2200 RPM Bh 8,505,000.00 9,355,500.00
224 Minyak bekisting Ltr 4,500.00 5,000.00
225 Minyak Cat / Thiner A Ltr 23,000.00 23,000.00
226 Minyak Cat / Thiner B Ltr 10,000.00 10,000.00
227 Minyak Pelumas Ltr 28,000.00 28,000.00
228 Minyak Tanah Ltr 10,000.00 10,000.00
229 Minyak tanah industri Ltr 12,100.00 12,100.00
230 Multiplek 6 mm, uk 1,20 x 2,40 m Lbr 99,000.00 100,000.00
231 Multiplek 9 mm, uk. 1,20 x 2,40 m Lbr 132,000.00 133,000.00
232 Mur, Baut baja dia 3/4" panjang 10 cm Bh 18,000.00 19,000.00
233 Mur, Baut biasa dia 3/4" panjang 10 cm Bh 11,000.00 12,000.00
234 Naco (Kerangka dan Daun ) M2 240,000.00 250,000.00
235 Nok atap genteng metal Lbr 46,200.00 47,000.00
236 Oli Gardan Ltr 27,300.00 31,900.00
237 Pagar Besi BRC Pabrikasi ( Besi Ø6"- Ø8" Uk.120 x 240 )cm M2 147,800.00 162,500.00
238 Pagar Besi BRC Pabrikasi ( Besi Ø6"- Ø8" Uk.150 x 240 )cm M2 123,200.00 135,600.00
239 Pagar Besi BRC Pabrikasi ( Besi Ø6" - Ø8" Uk. 90 x 240 )cm M2 166,000.00 182,600.00
240 Pagar pipa besi holo (20.20.1)mm,Rangka besi holo (50.50.2)mm M2/Psg 386,700.00 425,300.00
241 Pagar pipa besi holo (20.20.2)mm,Rangka besi holo (50.50.2)mm M2/Psg 477,300.00 525,000.00
242 Paku biasa Kg 16,000.00 16,000.00
243 Paku Gypsum Kg 22,000.00 23,000.00
244 Paku Asbes Kg 36,000.00 37,000.00
245 Paku beton Bj 400.00 400.00
246 Paku Kait ( pancing ) Bh 1,000.00 1,000.00
247 Paku Sekrup Bh 600.00 700.00
248 Paku Seng ( Paku payung ) Kg 30,000.00 31,000.00
249 Paku Sumbat Bh 1,400.00 1,400.00
250 Panel CU 3 Bh 23,595,000.00 28,314,000.00
251 Panel kontrol 1WLC DOL 1,6 kw 1x220 V 50 Hz Unit 2,545,000.00 2,728,000.00
252 Panel kontrol 2WLC DOL 1,5 kw 3x380 V 50 Hz Unit 5,682,000.00 7,103,000.00
253 Panel kontrol 2WLC DOL 2,2 kw 3x380 V 50 Hz Unit 5,682,000.00 7,103,000.00
254 Panel kontrol 2WLC DOL 3,2 kw 1x220 V 50 Hz Unit 5,682,000.00 7,103,000.00
255 Panel kontrol 2WLC DOL 4 kw 3x380 V 50 Hz Unit 5,682,000.00 7,103,000.00
256 Panel kontrol 2WLC DOL 5,5 kw 3x380 V 50 Hz Unit 5,910,000.00 7,387,000.00
257 Panel kontrol 2WLC DOL 7,5 kw 3x380 V 50 Hz Unit 5,910,000.00 7,387,000.00

9
1 2 3 4 5 6
258 Partikel board t = 18 mm (1.22 m x 2.42 m ) Lbr 138,600.00 140,000.00
259 Pas. Huruf logo nama stainlees uk. 20 - 30 cm Bh 66,000.00 70,000.00
260 Pas. Huruf logo nama stainlees uk. 30 - 40 cm Bh 79,200.00 84,000.00
261 Pas. Huruf logo nama stainlees uk. 40 - 50 cm Bh 92,400.00 98,000.00
262 Pas. Pagar Besi Tuang Ø14" M2/Psg 364,600.00 401,400.00
263 Pas. Pagar Besi Tuang Ø16" M2/Psg 425,300.00 468,000.00
264 Pas. Pintu Pagar Besi Tuang Ø14" (komplit) M2/Psg 331,400.00 364,500.00
265 Pas. Pintu Pagar Besi Tuang Ø16" (komplit) M2/Psg 441,900.00 486,000.00
266 Pasang tiang listrik cor beton Titik 1,815,000.00 2,178,000.00
267 PC / Portland cement Kg 1,450.00 1,450.00
268 Piercing conector Bh 605,000.00 726,000.00
269 Pintu aluminium coklat / hitam 4" M2 660,000.00 670,000.00
270 Pintu besi baja M2 990,000.00 1,000,000.00
271 Pintu besi lipat ( Bukan Harmonika) M2 409,100.00 491,000.00
272 Pintu besi lipat ( harmonika) M2 990,000.00 1,000,000.00
273 Pintu kaca sliding Bh 5,000,000.00 5,091,000.00
274 Pintu Pagar besi holo (20.20.2)mm, Rangka besi holo (50.50.2)m M2/Psg 522,800.00 575,000.00
275 Pintu Pagar pipa besi holo (20.20.1)mm, Rangka besi holo (50.50 M2/Psg 441,900.00 486,000.00
276 Pintu PVC Polos Bh 186,000.00 195,300.00
277 Pipa Besi  2/4 Tebal= 1.2 mm M' 14,500.00 16,000.00
278 Pipa Besi  2/4 Tebal= 1.4 mm M' 15,500.00 17,000.00
279 Pipa Besi  4/4 Tebal= 1.2 mm M' 16,500.00 18,000.00
280 Pipa Besi  4/4 Tebal= 1.4 mm M' 18,000.00 20,000.00
281 Pipa Galvanis Ø 1" Tebal 0.8 mm M' 12,000.00 13,500.00
282 Pipa Galvanis Ø1.5" Tebal 0.8 mm M' 15,000.00 15,000.00
283 Pipa Galvanis Ø2" Tebal 0.8 mm M' 19,500.00 22,000.00
284 Pipa Galvanis Ø2.5" Tebal 0.8 mm M' 28,500.00 31,500.00
285 Pipa Galvanis Ø3" Tebal 0.8 mm M' 50,000.00 50,000.00
286 Pipa Galvanis Ø4" Tebal 0.8 mm M' 60,000.00 66,000.00
287 Pipa GI BSA Med. Biru diameter 0,5" M' / bhn 27,000.00 29,700.00
288 Pipa GI BSA Med. Biru diameter 1" M' / bhn 36,200.00 39,800.00
289 Pipa GI BSA Med. Biru diameter 1,5" M' / bhn 77,000.00 84,700.00
290 Pipa GI BSA Med. Biru diameter 2" M' / bhn 74,750.00 82,500.00
291 Pipa GI BSA Med. Biru diameter 2,5" M' / bhn 94,000.00 103,400.00
292 Pipa GI BSA Med. Biru diameter 3" M' / bhn 126,700.00 139,500.00
293 Pipa GI BSA Med. Biru diameter 3/4" M' / bhn 33,300.00 36,700.00
294 Pipa GI BSA Med. Biru diameter 4" M' / bhn 200,000.00 220,000.00
295 Pipa GI BSA Med. Merah diameter 1" M' / bhn 24,700.00 27,200.00
296 Pipa GI BSA Med. Merah diameter 2" M' / bhn 52,500.00 57,750.00
297 Pipa GI BSA Med. Merah diameter 2,5" M' / bhn 71,000.00 78,100.00
298 Pipa GI BSA Med. Merah diameter 3" M' / bhn 87,500.00 96,500.00
299 Pipa GI BSA Med. Merah diameter 4" M' / bhn 124,200.00 136,700.00
300 Pipa kurasan plastik Bh 4,000.00 4,500.00
301 Pipa SDR 21 Diameter 4" (Pipa PE) M' / bhn 44,500.00 48,500.00
302 Pipa SDR 21 Diameter 6" (Pipa PE) M' / bhn 93,500.00 102,500.00
303 Plamur kayu Kg 15,600.00 16,000.00
304 Plamur Tembok Kg 9,300.00 9,800.00
305 Playwood ( 120 x 240 ) cm, tbl. 4 mm Lbr 62,400.00 65,000.00
306 Politur jadi Ltr 42,000.00 43,000.00
307 Pompa air Alcon Dia 3" (setara Honda WB 30 XT) Unit 3,314,000.00 3,645,000.00
308 Pompa air listrik 40 lt/menit 125 watt Bh 454,500.00 500,000.00
309 Pompa GRUNDFOS, Type CM 10-3 Unit 13,417,000.00 14,760,000.00

10
1 2 3 4 5 6
310 Pompa GRUNDFOS, Type CR 10-12 Unit 21,475,000.00 23,622,000.00
311 Pompa GRUNDFOS, Type CR 10-16 Unit 27,020,000.00 27,055,000.00
312 Pompa GRUNDFOS, Type CR 10-22 Unit 32,542,000.00 35,786,000.00
313 Pompa GRUNDFOS, Type CR 5-16 Unit 11,210,000.00 15,121,800.00
314 Pompa GRUNDFOS, Type SP 5A-17 Unit 11,185,000.00 12,304,000.00
315 Pompa JP Basic 5 Unit 5,120,000.00 5,631,500.00
316 Pompa Sub Mersible Sp. 17.37 Unit 102,850,000.00 123,420,000.00
317 Pompa Tangan Bh 425,000.00 510,000.00
318 Profil daun pintu almunium coklat / hitam Bh 79,200.00 83,100.00
319 Profil kusen almunium coklat / hitam 4" M' 92,400.00 97,000.00
320 Profil kusen aluminium 4" M' 80,000.00 84,000.00
321 Profil kusen aluminium 4"ykk M2 160,000.00 168,000.00
322 PVC AW Dia 1 " M' / bhn 7,250.00 7,900.00
323 PVC AW Dia 1/2 " M' / bhn 5,100.00 5,300.00
324 PVC AW Dia 10 " M' / bhn 265,000.00 271,500.00
325 PVC AW Dia 12 " M' / bhn 378,000.00 388,000.00
326 PVC AW Dia 14 " M' / bhn 532,000.00 546,000.00
327 PVC AW Dia 16 " M' / bhn 665,000.00 682,000.00
328 PVC AW Dia 2 " M' / bhn 17,500.00 19,200.00
329 PVC AW Dia 2 ,5" M' / bhn 25,000.00 25,000.00
330 PVC AW Dia 3 " M' / bhn 36,000.00 36,000.00
331 PVC AW Dia 3/4 " M' / bhn 6,300.00 6,500.00
332 PVC AW Dia 4 " M' / bhn 52,500.00 52,500.00
333 PVC AW Dia 5 " M' / bhn 90,600.00 93,000.00
334 PVC AW Dia 6 " M' / bhn 120,000.00 123,000.00
335 PVC AW Dia 8 " M' / bhn 186,000.00 191,000.00
336 PVC (Class D) Dia 1.25 " M' / bhn 6,500.00 6,500.00
337 PVC (Class D) Dia 10 " M' / bhn 190,000.00 195,000.00
338 PVC (Class D) Dia 12 " M' / bhn 259,000.00 266,000.00
339 PVC (Class D) Dia 14 " M' / bhn 340,000.00 348,000.00
340 PVC (Class D) Dia 16 " M' / bhn 439,000.00 450,500.00
341 PVC (Class D) Dia 2 " M' / bhn 9,500.00 10,500.00
342 PVC (Class D) Dia 2.5 " M' / bhn 14,000.00 15,400.00
343 PVC (Class D) Dia 3 " M' / bhn 20,500.00 22,500.00
344 PVC (Class D) Dia 4 " M' / bhn 28,500.00 31,400.00
345 PVC (Class D) Dia 5 " M' / bhn 51,000.00 56,100.00
346 PVC (Class D) Dia 6 " M' / bhn 62,000.00 68,200.00
347 PVC (Class D) Dia 8 " M' / bhn 108,000.00 118,800.00
348 PVC. AW Dia 2.5" M' / bhn 28,000.00 30,800.00
349 PVC. Diameter 2" (S 12,5) M'/psg 4,500.00 4,900.00
350 PVC. Diameter 2" (S 12,5) M'/psg 4,500.00 4,900.00
351 PVC. Diameter 2,5" (S 12,5) M'/psg 4,500.00 4,900.00
352 PVC. Diameter 2,5" (S 12,5) M'/psg 4,500.00 4,900.00
353 PVC. Diameter 3" (S 12,5) M'/psg 5,500.00 6,000.00
354 PVC. Diameter 3" (S 12,5) M'/psg 5,500.00 6,000.00
355 PVC. Diameter 4" (S 12,5) M'/psg 6,000.00 6,600.00
356 PVC. Diameter 4" (S 12,5) M'/psg 6,000.00 6,600.00
357 PVC. Diameter 6" (S 12,5) M'/psg 8,500.00 9,500.00
358 PVC. Diameter 6" (S 12,5) M'/psg 8,500.00 9,500.00
359 PVC. Diameter 8" (S 12,5) M'/psg 9,000.00 9,900.00
360 PVC. Diameter 8" (S 12,5) M'/psg 9,000.00 9,900.00
361 Ralling tangga / tangga stainlees M2 495,000.00 519,800.00

11
1 2 3 4 5 6
362 Ralling tangga / pagar besi M2 363,000.00 381,100.00
363 Rangka plafond metal furing M' 8,700.00 8,900.00
364 Reducer Ǿ 3 - Ǿ 2 Unit 136,500.00 150,200.00
365 Reducer Ǿ 4 - Ǿ 3 Unit 182,000.00 200,200.00
366 Reducer PVC Ø 3" - 2" Bh 90,500.00 99,500.00
367 Reducer PVC Ø 4" - 3" Bh 105,000.00 115,500.00
368 Rel pintu dorong Unit 245,000.00 269,500.00
369 Reservoir fiber kapasitas 1.100 Ltr (Profil Tank) Bh 1,250,000.00 1,375,000.00
370 Reservoir fiber kapasitas 800 Ltr (Profil Tank) Bh 800,000.00 850,000.00
371 Residu ( Ter ) Ltr 5,500.00 5,500.00
372 Rol baja dia 19 mm lengkap Unit 121,000.00 145,200.00
373 Roling Door aluminium M2 400,000.00 425,000.00
374 Screen dia 2" Bh 121,000.00 145,000.00
375 Screen dia 3" Bh 151,250.00 181,500.00
376 Screen dia 4" Bh 211,750.00 254,000.00
377 Seal Tape Rol 23,100.00 38,100.00
378 Sealant Tube 33,000.00 34,700.00
379 Selot ( kunci pintu ) merk SES Bh 210,000.00 220,500.00
380 Selot Rossete Dekson Bh 329,000.00 345,400.00
381 Semen Putih / warna Kg 2,000.00 2,000.00
382 Sending impra ( melamine) Kg 43,200.00 45,300.00
383 Seng Gelombang Bjls 20 uk. 180 x 90 x 0,02 cm Lbr 46,500.00 47,000.00
384 Seng gelombang BJLS 20 uk. 305 x 90 x 0,02 cm Lbr 77,000.00 78,000.00
385 Seng Gelombang Bjls 30 uk 180 x 90 x 0,03Cm Lbr 66,000.00 67,000.00
386 Seng gelombang BJLS 30 uk.305 x 90 x 0,03 Cm Lbr 121,000.00 122,000.00
387 Seng Plat BJLS 20 lebar 0,90 m M' 10,800.00 11,000.00
388 Seng Plat BJLS 30 lebar 0,90 m M' 41,000.00 42,000.00
389 Shower Dupon Bh 225,000.00 237,000.00
390 Skrup Fixer Bh 500.00 600.00
391 Slot ( Kunci-kunci pintu ) lokal Bh 60,000.00 65,000.00
392 Sock GI Ǿ 2" Bh 13,600.00 15,000.00
393 Sock GI Ǿ 2" Bh 13,600.00 15,000.00
394 Sock GI Ǿ 3" Bh 32,500.00 35,600.00
395 Sock GI Ǿ 3" Bh 32,500.00 35,600.00
396 Sock GI Ǿ 4" Bh 51,000.00 56,000.00
397 Sock GI Ǿ 4" Bh 51,000.00 56,000.00
398 Sock PVC Ǿ 3" Bh 13,600.00 15,000.00
399 Soda api Kg 33,000.00 34,000.00
400 Sok Drat Luar Ǿ 1/2" Bh 6,500.00 7,000.00
401 Sok Drat PVC Ǿ 3/4 - 1/2" Bh 2,300.00 2,500.00
402 Sok GI Ǿ 1/2" Bh 3,000.00 3,400.00
403 Solar Ltr 4,950.00 4,950.00
404 Solar industri Ltr 11,900.00 11,900.00
405 Spanmur Bh 12,100.00 20,000.00
406 Start Port Bh 242,000.00 290,500.00
407 Stempet / Gemuk Kg 33,000.00 33,000.00
408 Stop Kran Dia 1 " Bh 38,200.00 42,000.00
409 Stop Kran Dia 1/2 " Bh 28,400.00 31,500.00
410 Stop Kran Dia 3/4 " Bh 32,700.00 36,000.00
411 Stop kran dia 1" kuningan Bh 54,500.00 60,000.00
412 Stop kran dia 1" plastik Bh 13,000.00 14,500.00
413 Stop kran dia 1/2" kuningan Bh 120,000.00 132,000.00

12
1 2 3 4 5 6
414 Stop kran dia 3/4" kuningan Bh 42,000.00 46,200.00
415 Stop Kran Ǿ 1/2" Bh 43,200.00 47,500.00
416 Talang PVC U 4" M' 21,000.00 23,100.00
417 Tandon air stainlees steel kap. 1.000 ltr Bh 2,880,000.00 3,024,000.00
418 Tandon air stainlees steel kap. 550 ltr Bh 1,920,000.00 2,016,000.00
419 Tangga Pipa GI Ǿ 1" Unit 544,500.00 653,400.00
420 TC (Twisted Cable) : 3 x 70 + 1 x 50 Bh 72,600.00 79,800.00
421 Teak oil Ltr 7,000.00 7,700.00
422 Teakwood ( 122 X 242 ) Cm Lbr 99,000.00 108,900.00
423 Tee PVC dia 2"x dia 1" Bh 48,400.00 53,300.00
424 Tee PVC dia 3"x dia 2 1/2" Bh 90,900.00 100,000.00
425 Tee PVC Ǿ 2" x Ǿ1 1/ 2" Bh 60,500.00 66,500.00
426 Tee PVC Ǿ 2" x Ǿ 1/ 2" Bh 42,350.00 46,500.00
427 Tee PVC Ǿ 2" x Ǿ 2" Bh 72,600.00 79,800.00
428 Tee PVC Ǿ 3" Bh 13,600.00 14,900.00
429 Tee PVC Ǿ 3" x Ǿ 2" Bh 90,750.00 100,000.00
430 Tee PVC Ǿ 3" x Ǿ 3" Bh 121,000.00 133,100.00
431 Tee PVC Ǿ 3/4" Bh 2,300.00 2,500.00
432 Tee PVC Ǿ 4" Bh 15,000.00 16,500.00
433 Tee PVC Ǿ 4" x Ǿ 3" Bh 108,000.00 118,800.00
434 Tee PVC Ǿ 4" x Ǿ 4" Bh 151,250.00 166,400.00
435 Tegel alur 20/20 cm Bh 1,000.00 1,100.00
436 Tegel badak merah 20/20 cm Bh 1,100.00 1,200.00
437 Tekwood dilapis aluminium Lbr 93,000.00 94,000.00
438 Tempat Sabun Bh 26,400.00 27,000.00
439 Teralis Besi M2 300,000.00 325,000.00
440 Tralis stainlees M2 396,000.00 4,158,000.00
441 Travo Unit 5,445,000.00 6,534,000.00
442 Trek Schok Bh 90,750.00 108,900.00
443 Treker dia 12 mm Unit 60,500.00 72,700.00
444 Tripleks tebal 4 mm ( 1.20 x 2.40 ) m Lbr 62,400.00 63,000.00
445 Tripleks tebal 3 mm ( 0.90 x 2.40 ) m Lbr 34,800.00 36,000.00
446 Tripleks tebal 4 mm ( 0.90 x 2.00 ) m Lbr 42,200.00 43,000.00
447 Tripleks tebal 4 mm ( 1.10 x 2.10 ) m Lbr 56,100.00 56,500.00
448 Tripleks tebal 4 mm ( 1.22 x 2.44 ) m Lbr 62,400.00 63,000.00
449 Tutup Besi Baja Manhole Diameter 50 cm tebal=1 cm Unit 685,000.00 750,000.00
450 Urinoir Bh 275,000.00 280,000.00
451 Vent GI Ǿ 2" Bh 181,800.00 199,900.00
452 Vent GI Ǿ 3" Unit 242,000.00 266,200.00
453 Vent GI Ǿ 4" Bh 318,200.00 350,000.00
454 Vernis Ltr 32,800.00 36,000.00
455 Wall Pipe Seal Bh 90,800.00 99,800.00
456 Wash Out GI. Dia 3" Unit 181,500.00 199,600.00
457 Water Meter Ǿ 1/2" Bh 206,500.00 227,500.00
458 Water prooffing Kg 79,000.00 86,900.00
459 Wiremesh M7 Uk. (2,1x5.4) m Kg 11,000.00 12,100.00
460 Wood filler impra ( dempul jati ) Kg 28,200.00 31,000.00
461 Wood stain impra ( Pewarna melamine) Kg 60,000.00 66,000.00

LAMPU TAMAN DLL


1 Air Conditioning (AC) 1 1/2 PK Unit 4,204,500.00 4,204,500.00

13
1 2 3 4 5 6
2 Air Conditioning (AC) 1 PK Unit 3,977,500.00 3,977,500.00
3 Air Conditioning (AC) 1/2 PK Unit 3,068,500.00 3,068,500.00
4 Air Conditioning (AC) 2 PK Unit 5,113,600.00 5,113,600.00
5 Air Conditioning (AC) 3/4 PK Unit 3,409,000.00 3,409,000.00
6 Arde Bh 181,500.00 217,800.00
7 Arde 08 mm M' 11,000.00 11,000.00
8 Arde 12 mm M' 13,700.00 13,700.00
9 Arde 12 mm yang panjang M' 27,500.00 27,500.00
10 Arde 14 mm M' 22,700.00 22,700.00
11 Arde 16 mm M' 24,500.00 24,500.00
12 Arde 16 mm yang panjang M' 41,000.00 41,000.00
13 Arde 18 mm M' 29,000.00 29,000.00
14 Balok 20 Watt Double Bh 34,000.00 34,000.00
15 Balok 40 Watt Double Bh 42,700.00 42,700.00
16 Batu Baterai Timer Set 51,500.00 51,500.00
17 BC (kabel tembaga) 06 mm M' 10,500.00 10,500.00
18 BC (kabel tembaga) 16 mm Bh 20,000.00 20,000.00
19 BC (kabel tembaga) 25 mm Bh 29,100.00 29,100.00
20 Box MCB 1 grup Bh 8,200.00 8,200.00
21 Box MCB 2 grup Bh 11,000.00 11,000.00
22 Box MCB 3 grup Bh 13,600.00 13,600.00
23 Box meter MG Bh 29,000.00 29,000.00
24 Box Meter panel saka 1P/B Bh 447,800.00 447,800.00
25 Box Panel KWH 40/60 cm Bh 574,500.00 574,500.00
26 Box presto uticon 4 grup Bh 32,000.00 32,000.00
27 Box presto uticon 8 grup Bh 41,000.00 41,000.00
28 BUSBAR (Plat Tembaga) Nol & Arde (2x20mm) M' 127,500.00 127,500.00
29 CONECTOR Bh 11,000.00 11,000.00
30 Conector Picing Bh 8,600.00 8,600.00
31 Contactor Bh 421,500.00 421,500.00
32 Dop 10W sampai 100W Bh 2,750.00 2,750.00
33 Dop Pijar Bh 7,300.00 7,300.00
34 Dop Ps-47 Chiyoda Bh 2,700.00 2,700.00
35 FET 43D Rol 51,500.00 51,500.00
36 Fitcing tempel ( broco) Bh 22,700.00 22,700.00
37 Fiting Halogen Stick 1000 Watt Bh 20,000.00 20,000.00
38 Fiting Halogen Stick 150 Watt Bh 14,500.00 14,500.00
39 Fiting Halogen Stick 500/300 Watt Bh 16,400.00 16,400.00
40 Fiting Sambung E40-E27 Bh 17,300.00 17,300.00
41 Fitting besi Kj E - 40 Bh 35,000.00 35,000.00
42 Fitting LHE 58 Watt ( E 40 ) Bh 23,600.00 23,600.00
43 Fitting Sambung Keramik E 27 Bh 16,500.00 16,500.00
44 Fitting TL Bh 7,000.00 7,000.00
45 Ft besi berco E - 27 Bh 10,000.00 10,000.00
46 Ft besi Kj E - 40 Bh 22,700.00 22,700.00
47 Ft ceramic E-40 gantung Bh 17,300.00 17,300.00
48 Fuse box Broco 1 grup Bh 24,000.00 24,000.00
49 Fuse box Broco 2 grup Bh 41,800.00 41,800.00
50 Fuse box Broco 3 grup Bh 58,200.00 58,200.00
51 Fuse box Max 1 grup Bh 89,500.00 89,500.00
52 Hakiki NYAF serabut engkel NYAF = 0.75 mm(100m) Rol 122,700.00 122,700.00
53 Hakiki NYAF serabut engkel NYAF = 1.5 mm(100m) Rol 204,500.00 204,500.00

14
1 2 3 4 5 6
54 Hakiki NYAF serabut engkel NYAF = 2.5 mm(100m) Rol 341,000.00 341,000.00
55 Hakiki NYAF serabut engkel NYAF = 4 mm(100m) Rol 500,000.00 500,000.00
56 Hakiki NYAF serabut engkel NYAF = 6 mm(100m) Rol 800,000.00 800,000.00
57 Halogen stic 1000W Philips Bh 72,700.00 72,700.00
58 Halogen stic 150W philips Bh 26,000.00 26,000.00
59 Halogen stic 300W Philips Bh 29,500.00 29,500.00
60 Halogen stic 500W Philips Bh 32,000.00 32,000.00
61 Handel G2 15 Bh 125,500.00 125,500.00
62 Handel G2 32 Bh 168,200.00 168,200.00
63 Handel G2 63 Bh 313,600.00 313,600.00
64 Handel 60 A Bh 166,000.00 166,000.00
65 Handel G 2 30 A Blitz Bh 70,500.00 70,500.00
66 Handlle Bh 222,700.00 222,700.00
67 HPIT 250W Philips Bh 163,600.00 163,600.00
68 HPIT 400W Philips Bh 200,000.00 200,000.00
69 Ignitor untuk Lampu Philips, S1- 51 putih Bh 54,500.00 54,500.00
70 Ignitor untuk Lampu Philips, S1- 58 kuning Bh 59,200.00 59,200.00
71 Ignitor untuk Lampu Philips, SN 50 Bh 150,000.00 150,000.00
72 Ignitor untuk Lampu Philips, SN 51 Bh 150,000.00 150,000.00
73 Ignitor untuk Lampu Philips, SN 52 Bh 150,000.00 150,000.00
74 Ignitor untuk Lampu Philips, SN 72 Bh 168,181.82 168,181.82
75 Ignitor untuk Lampu Philips, SN 75 Bh 147,300.00 147,300.00
76 Isolasi Bh 8,000.00 8,800.00
77 Jet power lampu selang (soket) Bh 28,400.00 28,400.00
78 Kabel NYA 1.5 mm 100 m Rol 195,500.00 195,500.00
79 Kabel NYA 1.5 mm 50 m Rol 95,500.00 95,500.00
80 Kabel NYA 2.5 mm 100 m Rol 297,300.00 297,300.00
81 Kabel NYA 2.5 mm 50 m Rol 159,200.00 159,200.00
82 Kabel MYM Focus 4 x 4 mm Rol 2,625,000.00 2,625,000.00
83 Kabel NGA 1 x 1,5 mm Rol 204,500.00 204,500.00
84 Kabel NGA 1 x 2,5 mm Rol 332,000.00 332,000.00
85 Kabel NYAF SERABUT=0,75 mm Rol 174,200.00 174,200.00
86 Kabel NYM 3 x 4 mm Rol 1,591,000.00 1,591,000.00
87 Kabel NYM 4 x 2,5 mm Rol 1,469,500.00 1,469,500.00
88 Kabel Nymhy (serabut) 2 x 0.75 mm Roll 409,000.00 409,000.00
89 Kabel Nymhy (serabut) 2 x 2.5 mm Roll 1,343,000.00 1,343,000.00
90 Kabel Nymhy (serabut) 4 x 2.5 mm Roll 1,227,000.00 1,227,000.00
91 Kabel NYY 2 x 0,75 mm Rol 409,000.00 409,000.00
92 Kabel NYY 2 x 1,5 mm @ 100 m Rol 774,500.00 774,500.00
93 Kabel NYY 2 x 1,5 mm @ 100 m Rol 774,500.00 774,500.00
94 Kabel NYY 2 x 2,5 mm Rol 909,000.00 909,000.00
95 Kabel NYY 2 x 2,5 mm @ 100 m Rol 1,036,000.00 1,036,000.00
96 Kabel NYY 2 x 2,5 mm @ 50 m Rol 527,300.00 527,300.00
97 Kabel NYY 3 x 1,5 mm @ 100 m Rol 827,300.00 827,300.00
98 Kabel NYY 3 x 2,5 mm @ 100 m Rol 1,063,700.00 1,063,700.00
99 Kabel NYY 3 x 2,5 mm @ 50 m Rol 645,500.00 645,500.00
100 Kabel NYY 4 x 2,5 mm @ 100 m Rol 1,545,500.00 1,545,500.00
101 Kabel NYY 4 x 2,5 mm @ 50 m Rol 772,700.00 772,700.00
102 Kabel NYY 4 x 4 mm @ 100 m Rol 2,509,000.00 2,509,000.00
103 Kabel NYY 4 x 4 mm @ 50 m Rol 1,254,500.00 1,254,500.00
104 Kabel NYY 4 x 4 mm @ 50 m Rol 1,254,500.00 1,254,500.00
105 Kabel NYY 4 x 6 mm @ 100 m Rol 3,263,700.00 3,263,700.00

15
1 2 3 4 5 6
106 Kabel NYY HYO 2 x 0,75 mm @ 100 m Rol 432,000.00 432,000.00
107 Kabel NYY HYO 2 x 0,75 mm @ 50 m Rol 218,200.00 218,200.00
108 Kabel NYY HYO 2 x 1,5 mm @ 100 m Rol 736,500.00 736,500.00
109 Kabel NYY HYO 2 x 1,5 mm @ 50 m Rol 371,000.00 371,000.00
110 Kabel NYY HYO 2 x 2,5 mm @ 50 m Rol 551,000.00 551,000.00
111 Kabel NYY HYO 2x 2,5 mm @ 100 m Rol 1,102,000.00 1,102,000.00
112 Kabel NYY HYO 3 x 1,5 mm @ 100 m Rol 1,009,000.00 1,009,000.00
113 Kabel NYY HYO 3 x 1,5 mm @ 50 m Rol 507,300.00 507,300.00
114 Kabel NYY HYO 3 x 2,5 mm @ 100 m Rol 1,478,200.00 1,478,200.00
115 Kabel NYY HYO 3 x 2,5 mm @ 50 m Rol 742,000.00 742,000.00
116 Kabel PVC 2 x 23 mm Rol 136,500.00 136,500.00
117 Kabel Twistied 2 x 10 Apolo M' 4,500.00 4,500.00
118 Kabel Twistied 2 x 10 Daisaku M' 4,500.00 4,500.00
119 Kabel Twistied 2 x 10 Pulong M' 11,000.00 11,000.00
120 Kabel Twistit (Pulung) M' 6,000.00 6,000.00
121 Kabel U NYY 6 mm (kabel meter) M' 19,500.00 19,500.00
122 Kap Halogen 1000 Rol 113,600.00 113,600.00
123 Kap Halogen 150 Rol 54,500.00 54,500.00
124 Kap Halogen 500/300 Rol 56,500.00 56,500.00
125 Kap HPIT 250 Watt Bh 227,300.00 227,300.00
126 Kap HPIT 400 Watt Bh 227,300.00 227,300.00
127 Kap ijo E- 27 pasific Bh 16,500.00 16,500.00
128 Kap ijo E- 40 dexta Bh 24,500.00 24,500.00
129 Kap Lampu Gantung Hijau (E-40) Bh 51,500.00 51,500.00
130 Kap Lampu TL 20 Watt balak TKOU 1 X 20 Bh 38,200.00 38,200.00
131 Kap Lampu TL 40 Watt balak TKOU 1 X 40 Bh 65,500.00 65,500.00
132 Kap MC Bh 27,300.00 27,300.00
133 Kap Reflektor (putih) Kap. Industri 8" E40 Bh 92,700.00 92,700.00
134 Kap Totok Bh 1,363,600.00 1,363,600.00
135 Kapasitor 25 µ Bh 43,700.00 43,700.00
136 Kapasitor 30 µ Bh 47,300.00 47,300.00
137 Kawat Tarik uk 14 Bh 31,000.00 31,000.00
138 Klem Dexicon no. 5 -7 Bh 7,300.00 7,300.00
139 Klem Dexicon no. 8 - 17 Bh 9,000.00 9,000.00
140 Klem Imundex no 10 Dos 13,600.00 13,600.00
141 Klem Imundex no 12 Dos 16,400.00 16,400.00
142 Klem Imundex no 17 Dos 38,400.00 38,400.00
143 Klem Imundex no 4 Dos 5,500.00 5,500.00
144 Klem Imundex no 5 Dos 6,500.00 6,500.00
145 Klem Imundex no 6 Dos 7,000.00 7,000.00
146 Klem Imundex no 7 Dos 7,700.00 7,700.00
147 Klem Imundex no 8 Dos 68,200.00 68,200.00
148 Klem Imundex no 9 Dos 12,700.00 12,700.00
149 Konektor Bh 11,000.00 11,000.00
150 Kontaktor Telemekanik Bh 1,091,000.00 1,091,000.00
151 Kontaktor Telemekanik 18 Bh 259,000.00 259,000.00
152 Kontaktor Telemekanik 19 Bh 309,000.00 309,000.00
153 KWH meter Fuji darma Bh 72,700.00 72,700.00
154 KWH meter metbelosa Bh 95,500.00 95,500.00
155 Lampu Halopika spring Bh 43,200.00 43,200.00
156 Lampu Spot JCDR 20 Watt Bh 11,400.00 11,400.00
157 Lampu Spot JCDR 50 Watt Bh 14,000.00 14,000.00

16
1 2 3 4 5 6
158 Lampu TL 2 x 20 watt komplit Bh 83,700.00 83,700.00
159 Lampu Bola Kaca Taman Bh 131,400.00 131,400.00
160 Lampu Cocrolux EL Compact E 27 18 Watt Bh 272,700.00 272,700.00
161 Lampu dinding Bh 86,400.00 86,400.00
162 Lampu dop pijar 10 W Philips-15W Bh 4,000.00 4,000.00
163 Lampu dop pijar 100 W Bh 5,000.00 5,000.00
164 Lampu dop pijar 200 W Bh 9,500.00 9,500.00
165 Lampu dop pijar 25 W Philips-40W Bh 4,000.00 4,000.00
166 Lampu dop pijar 5 W Bh 5,900.00 5,900.00
167 Lampu dop pijar 60 W Philips-75W Bh 4,500.00 4,500.00
168 Lampu Dulux " D " Modern G 24d 10 Watt Bh 86,400.00 86,400.00
169 Lampu Hias (Selang) 10m Bh 150,500.00 150,500.00
170 Lampu Hias Meteor Uk. 40 cm Bh 113,600.00 113,600.00
171 Lampu Hias Meteor Uk. 60 cm Bh 136,500.00 136,500.00
172 Lampu Hias Meteor Uk. 80 cm Bh 154,500.00 154,500.00
173 Lampu itami jari biasa Bh 7,200.00 7,200.00
174 Lampu kolam Ttk 310,900.00 310,900.00
175 Lampu LHE 13 Watt ( E 27 ) Bh 48,600.00 48,600.00
176 Lampu LHE 18 Watt Spiral( E 27 ) Bh 60,500.00 60,500.00
177 Lampu LHE 23 Watt ( E 27 ) Bh 56,000.00 56,000.00
178 Lampu LHE 24 Watt ( E 27 ) Bh 57,700.00 57,700.00
179 Lampu LHE 25 Watt Spiral ( E 27 ) Bh 69,000.00 69,000.00
180 Lampu LHE 36 Watt ( E 27 ) Bh 93,200.00 93,200.00
181 Lampu LHE 36 Watt Kuning ( E 27 ) Bh 104,500.00 104,500.00
182 Lampu LHE 45 Watt (E27) Bh 124,500.00 124,500.00
183 Lampu LHE 45 Watt Kuning (E27) Bh 138,600.00 138,600.00
184 Lampu LHE 58 Watt ( E 27 ) Bh 130,000.00 130,000.00
185 Lampu LHE 58 Watt ( E 40 ) Bh 139,500.00 139,500.00
186 Lampu LHE 58 Watt Kuning ( E 40 ) Bh 155,900.00 171,500.00
187 Lampu LHE 80 Watt ( E 40 ) Bh 348,200.00 348,200.00
188 Lampu MC 125 Watt Bh 46,000.00 46,000.00
189 Lampu MC 250 Watt Bh 95,454.55 95,454.55
190 Lampu MC 250 Watt Kuning Bh 181,800.00 181,800.00
191 Lampu MC 400 Watt Bh 122,700.00 122,700.00
192 Lampu MC 400 Watt Kuning Bh 218,200.00 218,200.00
193 Lampu Meteor Bh 140,900.00 140,900.00
194 Lampu ML 160 Watt Bh 43,200.00 43,200.00
195 Lampu philips ML 500 W Bh 63,600.00 63,600.00
196 Lampu philips ML 160 W Bh 27,300.00 27,300.00
197 Lampu philips ML 250 W Bh 41,800.00 41,800.00
198 Lampu Pijar Khusus Ph., Softone 10 W Bh 6,400.00 6,400.00
199 Lampu Pijar Umum Ph., Argenta 100 W Bh 7,700.00 7,700.00
200 Lampu Pijar Umum Ph., Argenta 25 W Bh 6,400.00 6,400.00
201 Lampu Pijar Umum Ph., Argenta 40 W Bh 6,400.00 6,400.00
202 Lampu Pijar Umum Ph., Argenta 60 W Bh 7,700.00 7,700.00
203 Lampu Pijar Umum Ph., Argenta 75 W Bh 7,700.00 7,700.00
204 Lampu Pijar Umum Ph., S P T60 40 W Bh 8,500.00 8,500.00
205 Lampu Pijar Umum Ph., S W T60 100 W Bh 8,500.00 8,500.00
206 Lampu Pijar Umum Ph., S W T60 25 W Bh 7,700.00 7,700.00
207 Lampu Pijar Umum Ph., S W T60 40 W Bh 7,700.00 7,700.00
208 Lampu Pijar Umum Ph., S W T60 60 W Bh 7,900.00 7,900.00
209 Lampu Pijar Umum Ph., S W T60 75 W Bh 79,000.00 79,000.00

17
1 2 3 4 5 6
210 Lampu Pijar Umum Ph., Softone 10 W Bh 5,900.00 5,900.00
211 Lampu Pijar Umum Ph., Softone 100 W Bh 7,600.00 7,600.00
212 Lampu Pijar Umum Ph., Softone 15 W Bh 5,900.00 5,900.00
213 Lampu Pijar Umum Ph., Softone 150 W Bh 12,300.00 12,300.00
214 Lampu Pijar Umum Ph., Softone 200 W Bh 13,600.00 13,600.00
215 Lampu Pijar Umum Ph., Softone 25 W Bh 5,900.00 5,900.00
216 Lampu Pijar Umum Ph., Softone 40 W Bh 5,900.00 5,900.00
217 Lampu Pijar Umum Ph., Softone 60 W Bh 6,000.00 6,000.00
218 Lampu Pijar Umum Ph., Softone 75 W Bh 6,000.00 6,000.00
219 Lampu Pijar Umum Ph., SP Lux 100 W Bh 72,700.00 72,700.00
220 Lampu Pijar Umum Ph., SP Lux 25 W Bh 6,800.00 6,800.00
221 Lampu Pijar Umum Ph., SP Lux 40 W Bh 6,800.00 6,800.00
222 Lampu Pijar Umum Ph., SP Lux 60 W Bh 65,900.00 65,900.00
223 Lampu Pijar Umum Ph., SP Lux 75 W Bh 65,900.00 65,900.00
224 Lampu Selang Rol 3,591,000.00 3,591,000.00
225 Lampu Sokle 300 Watt Bh 72,700.00 72,700.00
226 Lampu sorot Bh 52,000.00 52,000.00
227 Lampu Sorot PAR 220 V 120 W Bh 159,000.00 159,000.00
228 Lampu Sorot PAR 220 V 80 W Bh 77,200.00 77,200.00
229 Lampu spot light 150 watt eks philips ( lengkap) Bh 82,300.00 82,300.00
230 Lampu spot light 300 watt eks philips ( lengkap) Bh 116,800.00 116,800.00
231 Lampu Taman Bh 56,800.00 56,800.00
232 Lampu TL 2 x 40 watt komplit Bh 154,500.00 154,500.00
233 Lampu TL down light besar Bh 83,200.00 83,200.00
234 Lampu TL down light kecil Bh 70,500.00 70,500.00
235 Lampu TL 10 Watt Bh 10,000.00 10,000.00
236 Lampu TL 20 Watt Bh 16,800.00 16,800.00
237 Lampu TL 20 watt komplit Bh 40,900.00 40,900.00
238 Lampu TL 32 Watt Bulat Bh 27,300.00 27,300.00
239 Lampu TL 40 Watt Bh 27,300.00 27,300.00
240 Lampu TL 40 watt komplit Bh 77,300.00 77,300.00
241 Lampu TL. Elektrik bulat / exon 20 watt philips Bh 20,000.00 20,000.00
242 Lampu TL. Elektrik merk philips 11 watt Bh 24,500.00 24,500.00
243 Lampu TL. Elektrik merk philips 14 watt Bh 23,600.00 23,600.00
244 Lampu TL. Elektrik merk philips 18 watt Bh 29,600.00 29,600.00
245 Lampu TL. Elektrik merk philips 23 watt Bh 341,000.00 341,000.00
246 Lampu TL. Elektrik merk philips 5 watt Bh 18,200.00 18,200.00
247 Lampu TL. Elektrik merk philips 8 watt Bh 20,000.00 20,000.00
248 Large Angle Bh 140,000.00 140,000.00
249 Mano Meter Bh 518,200.00 518,200.00
250 MC ML-N 125W Osram (Tanpa trafo) Bh 25,000.00 25,000.00
251 MC ML-N 250W Osram (Tanpa trafo) Bh 42,700.00 42,700.00
252 MC ML-N 500W Osram (Tanpa trafo ) Bh 68,200.00 68,200.00
253 MC HPL-N 125W Osram (Trafo) Bh 23,700.00 23,700.00
254 MC HPL-N 125W Philips (Trafo) Bh 24,500.00 24,500.00
255 MC HPL-N 250W Osram (Trafo) Bh 40,900.00 40,900.00
256 MC HPL-N 250W Philips (Trafo) Bh 45,500.00 45,500.00
257 MC HPL-N 400W Osram (Trafo) Bh 62,700.00 62,700.00
258 MC HPL-N 400W Philips (Trafo) Bh 68,200.00 68,200.00
259 MCB 25 A Psg 51,500.00 51,500.00
260 MCB 2A Psg 49,500.00 49,500.00
261 MCB 50 A Psg 159,600.00 159,600.00

18
1 2 3 4 5 6
262 MCB 63 A Bh 200,000.00 200,000.00
263 MCB MG Hitam 10 A Psg 45,500.00 45,500.00
264 MCB MG Hitam 16 A Psg 45,500.00 45,500.00
265 MCB MG Hitam 20 A Psg 45,500.00 45,500.00
266 MCB 1 fase (10A) Bh 31,800.00 31,800.00
267 MCB 1 fase (16A) Bh 31,800.00 31,800.00
268 MCB 1 fase (25A) Bh 31,800.00 31,800.00
269 MCB 1 fase (35A) Bh 31,800.00 31,800.00
270 MCB 1 fase (63A) Bh 286,400.00 286,400.00
271 MCB 32 Psg 51,500.00 51,500.00
272 MCB 40 A Psg 51,500.00 51,500.00
273 Mitsubishi Magnetic SN-10/220 Bh 245,500.00 245,500.00
274 Mitsubishi Magnetic SN-12/220 Bh 168,200.00 168,200.00
275 Mitsubishi Magnetic SN-21/220 Bh 245,500.00 245,500.00
276 Mitsubishi Magnetic SN-25/220 Bh 318,200.00 318,200.00
277 Mitsubishi Magnetic SN-35/220 Bh 381,800.00 381,800.00
278 Mitsubishi Magnetic SN-65/220 Bh 727,300.00 727,300.00
279 NFB 100A Bh 704,500.00 704,500.00
280 NFB 125A Bh 704,500.00 704,500.00
281 NFB 75A Bh 341,000.00 341,000.00
282 Nyaf 1.5 m eterne Roll 109,000.00 109,000.00
283 NYM 2X1.5 hakiki Roll 500,000.00 500,000.00
284 NYM 2X2.5 hakiki Roll 745,500.00 745,500.00
285 NYM 2X4 hakiki Roll 1,181,800.00 1,181,800.00
286 NYM 3X1.5 hakiki Roll 654,500.00 654,500.00
287 NYM 3X2.5 hakiki Roll 1,000,000.00 1,000,000.00
288 NYM 3X6 hakiki Roll 2,591,000.00 2,591,000.00
289 NYM 4X1.5 hakiki Roll 863,700.00 863,700.00
290 NYM 4X2.5 hakiki Roll 1,181,800.00 1,181,800.00
291 NYM 4X4 hakiki Roll 2,000,000.00 2,000,000.00
292 Nym focos 3 x 2.5 mm Roll 454,500.00 454,500.00
293 Nym focos 3 x 4 mm Roll 1,227,300.00 1,227,300.00
294 Nym focos 4 x 2.5 mm Roll 1,091,000.00 1,091,000.00
295 Nym focos 4 x 4 mm Roll 1,545,500.00 1,545,500.00
296 NYZ 2X23 (oval) hakiki Roll 363,700.00 363,700.00
297 Ongkos pasang titik lampu + instalasi Ttk 159,000.00 159,000.00
298 Paket PJU Solar Cell 5 m Modul 50 WP (10 watt) Pkt 15,563,600.00 15,563,600.00
299 Paket PJU Solar Cell 6 m Modul 80 WP (20 watt) Pkt 18,881,800.00 18,881,800.00
300 Paket PJU Solar Cell 7 m Modul 100 WP (30 watt) Pkt 22,136,400.00 22,136,400.00
301 Paket PJU Solar Cell 8 m Modul 130 WP (40 watt) Pkt 28,410,000.00 28,410,000.00
302 Paket PJU Solar Cell 9 m Modul 130 WP (40 watt) Pkt 28,910,000.00 28,910,000.00
303 Panel Box (40x60x20) Bh 231,800.00 231,800.00
304 Panel CU 3 Bh 23,595,000.00 28,314,000.00
305 Pasang KWH Meter 1300 VA Psg 3,181,000.00 3,181,000.00
306 Pasang KWH Meter 2200 VA Psg 3,636,000.00 3,636,000.00
307 Pasang KWH Meter 3500 VA Psg 4,545,000.00 4,545,000.00
308 Pasang KWH Meter 4400 VA Psg 5,636,000.00 5,636,000.00
309 Pasang KWH Meter 900 VA Psg 2,900,000.00 2,900,000.00
310 Pasang listrik baru 900 watt Unit 3,636,000.00 3,636,000.00
311 Pasang Tiang Listrik Cor Beton Bh 1,818,000.00 1,818,000.00
312 Philips jari essential 11 w Bh 29,500.00 29,500.00
313 Philips jari essential 13 w Bh 31,800.00 31,800.00

19
1 2 3 4 5 6
314 Philips jari essential 14 w Bh 33,600.00 33,600.00
315 Philips jari essential 18 w Bh 38,200.00 38,200.00
316 Philips jari essential 23 w Bh 39,000.00 39,000.00
317 Philips jari essential 26 w Bh 39,000.00 39,000.00
318 Philips jari essential 36 w Bh 54,500.00 54,500.00
319 Philips jari essential 45 w Bh 100,000.00 100,000.00
320 Philips jari essential 5 w Bh 24,500.00 24,500.00
321 Philips jari essential 65 w Bh 136,500.00 136,500.00
322 Philips jari essential 8 w Bh 25,500.00 25,500.00
323 Philips jari essential 85 w Bh 200,000.00 200,000.00
324 Philips SL Bh 50,000.00 50,000.00
325 Picing / Konektor Bh 9,000.00 9,000.00
326 Pipa Besi (Tiang bantu) Uk 3" dan 2½" Ljr 319,500.00 319,500.00
327 Pipa BSA Biru diameter 1" Lonjor 227,000.00 227,000.00
328 Pipa BSA Biru diameter 1,5" Lonjor 272,700.00 272,700.00
329 Pipa BSA Biru diameter 2" Lonjor 454,500.00 454,500.00
330 Pipa BSA Biru diameter 2,5 " Lonjor 545,500.00 545,500.00
331 Pipa BSA Biru diameter 3" Lonjor 591,000.00 591,000.00
332 Pipa BSA Biru diameter 4" Lonjor 909,000.00 909,000.00
333 Pipa BSA Biru diameter 5" Lonjor 1,136,000.00 1,136,000.00
334 Pipa BSA Merah diameter 1" Lonjor 409,000.00 409,000.00
335 Pipa BSA Merah diameter 1,5" Lonjor 454,500.00 454,500.00
336 Pipa BSA Merah diameter 2" Lonjor 636,500.00 636,500.00
337 Pipa BSA Merah diameter 2,5 " Lonjor 681,818.18 681,818.18
338 Pipa BSA Merah diameter 3" Lonjor 863,636.36 863,636.36
339 Pipa BSA Merah diameter 4" Lonjor 1,363,636.36 1,363,636.36
340 Pipa BSA Merah diameter 5" Lonjor 1,681,818.18 1,681,818.18
341 Piting TL Bh 5,000.00 5,000.00
342 Pose Bot Buah 16,800.00 16,800.00
343 Rel barr M' 26,000.00 26,000.00
344 Rel MCB Lot 6,800.00 6,800.00
345 Saklar ganda Bh 14,500.00 14,500.00
346 Saklar Panasonic (ganda) Bh 59,000.00 59,000.00
347 Saklar Panasonic (tunggal) Bh 52,500.00 52,500.00
348 Saklar tunggal Bh 12,700.00 12,700.00
349 Sambungan Jet P Lampu Selang Rol 14,500.00 14,500.00
350 Sed And As Bh 121,000.00 121,000.00
351 Sekring Komplit 50 A Bh 13,600.00 13,600.00
352 Sekring Matsuka 2 A - 10 A Bh 159,000.00 159,000.00
353 Selcon photosel 03A Bh 68,200.00 68,200.00
354 Selcon photosel 06A Bh 59,000.00 59,000.00
355 Selcon photosel 10A Bh 91,000.00 91,000.00
356 Sevis Bh 5,900.00 5,900.00
357 Shinyoku PLC 40w E-27 Bh 77,300.00 77,300.00
358 Shinyoku PLC 45w E-27 Bh 81,800.00 81,800.00
359 SISIR MCB 3 fase Lot 95,500.00 95,500.00
360 SKUN Kabel 16mm Bh 3,200.00 3,200.00
361 SKUN Kabel 25mm Bh 3,200.00 3,200.00
362 Soket Halogen 1000 Watt Bh 16,400.00 16,400.00
363 Soket Halogen 150 Watt Bh 12,700.00 12,700.00
364 Soket Halogen 500/300 Watt Bh 13,600.00 13,600.00
365 SON-H 250W Philips Bh 204,500.00 204,500.00

20
1 2 3 4 5 6
366 SON-H 350W Philips Bh 272,700.00 272,700.00
367 SON-T 250W Philips Bh 100,000.00 100,000.00
368 SON-T 400W Philips Bh 104,500.00 104,500.00
369 Sprayer Rol 83,200.00 83,200.00
370 Stater / S2 Bh 5,500.00 5,500.00
371 Stater / S4 Bh 5,500.00 5,500.00
372 Stop kontak Bh 16,400.00 16,400.00
373 Stop kontak Panasonic Bh 51,200.00 51,200.00
374 Sunnyco 45W/kuning Bh 81,800.00 81,800.00
375 Sunnyco 45W/putih Bh 79,000.00 79,000.00
376 T. Dos Kotak Bh 55,500.00 55,500.00
377 Tali Ties 10 cm Pak 6,800.00 6,800.00
378 Tali Ties 15 cm Pak 7,300.00 7,300.00
379 Tali Ties 20 cm Pak 11,400.00 11,400.00
380 Terminal 10 mm Bh 9,500.00 9,500.00
381 Terminal 16 mm Bh 22,700.00 22,700.00
382 Terminal 25 mm Bh 29,000.00 29,000.00
383 Terminal 6 mm Bh 8,000.00 8,000.00
384 Time Swite Bh 454,500.00 454,500.00
385 Timer Bh 259,000.00 259,000.00
386 TL 10W Focus Bh 4,500.00 4,500.00
387 TL 10W Philips Bh 11,400.00 11,400.00
388 TL 15W Chiyoda Bh 5,900.00 5,900.00
389 TL 15W Philips Bh 13,700.00 13,700.00
390 TL 18W Philips Bh 16,000.00 16,000.00
391 TL 20W Chiyoda Bh 7,300.00 7,300.00
392 TL 36W Philips Bh 18,200.00 18,200.00
393 TL 40W Chiyoda Bh 7,700.00 7,700.00
394 Trafo Elektrik TL 20 Watt Bh 43,200.00 43,200.00
395 Trafo Elektrik TL 40 Watt Bh 45,500.00 45,500.00
396 Trafo 5 Am Bh 191,800.00 191,800.00
397 Trafo MC 125 Watt Bh 81,800.00 81,800.00
398 Trafo MC 250 Watt Bh 136,400.00 136,400.00
399 Trafo MC 400 Watt Bh 127,300.00 127,300.00
400 Trafo TL 10 Watt Bh 35,500.00 35,500.00
401 Trafo TL 15 Watt Bh 25,000.00 25,000.00
402 Trafo TL 20 Watt Bh 38,600.00 38,600.00
403 Trafo TL 40 Watt Bh 41,000.00 41,000.00
404 Travo 125W Philips Bh 104,500.00 104,500.00
405 Travo 250W Philips Bh 163,700.00 163,700.00
406 Travo 400W Philips Bh 191,000.00 191,000.00
407 Trek Schok Bh 90,750.00 108,900.00
408 Viga PLC 85w E-27/Fitingan kecil Bh 91,000.00 91,000.00
409 Viga PLC 85w E-40/Fitingan besar Bh 100,000.00 100,000.00

21
STANDAR NASIONAL INDONESIA BANGUNAN GEDUNG DAN PERUMAHAN
ANALISA BIAYA KONSTRUKSI ( ABK ) TAHUN 2013 TRIWULAN I

PROPINSI : JAWA TIMUR


KABUPATEN : TULUNGAGUNG
SISTEM : KONTRAK
HARGA : BAWAH

HARGA JUMLAH HARGA


NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)

I. PEKERJAAN PERSIAPAN

1 1 m` Pagar sementara dari kayu tinggi 2 meter.


Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.25000 Btg 142,000.00 177,500.00
PC / Portland cement 2.50000 Kg 1,450.00 3,625.00
Pasir pasang / beton 0.00500 M3 120,000.00 600.00
Batu pecah 2-3 cm 0.00900 M3 230,000.00 2,070.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.07200 M3 4,200,000.00 302,400.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Residu ( Ter ) 0.40000 Lt 5,500.00 2,200.00
Tenaga
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.02000 Oh 68,000.00 1,360.00
32,110.00 489,355.00
2 1 m` Pagar sementara dari seng gelombang tinggi 2 meter.
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.25000 Btg 142,000.00 177,500.00
PC / Portland cement 2.50000 Kg 1,450.00 3,625.00
Seng Gelombang Bjls 20 uk. 180 x 90 x 0,02 cm 1.20000 Lbr 46,500.00 55,800.00
Pasir pasang / beton 0.00500 M3 120,000.00 600.00
Batu pecah 2-3 cm 0.00900 M3 230,000.00 2,070.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.07200 M3 4,200,000.00 302,400.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Cat Meny besi 0.45000 Kg 15,000.00 6,750.00
Tenaga
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.02000 Oh 68,000.00 1,360.00
32,110.00 549,705.00
3 1 m` Pagar sementara dari kawat duri tinggi 1,8 meter
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.00000 Btg 142,000.00 142,000.00
PC / Portland cement 2.00000 Kg 1,450.00 2,900.00
Kawat Duri 25.00000 Kg 1,700.00 42,500.00
Pasir pasang / beton 0.00500 M3 120,000.00 600.00
Batu pecah 2-3 cm 0.00900 M3 230,000.00 2,070.00

1
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.02000 Oh 68,000.00 1,360.00
27,610.00 191,030.00
4 1 m` Pengukuran dan pemasangan bouwplank
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01200 M3 4,200,000.00 50,400.00
Paku biasa 0.02000 Kg 16,000.00 320.00
Kayu Tahun papan ( Mauni/akasia) 0.00700 M3 4,500,000.00 31,500.00
Tenaga
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 82,220.00

2
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
5 1 m2 Pembuatan kantor sementara, dengan lantai plesteran
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.25000 Btg 142,000.00 177,500.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.18000 M3 4,200,000.00 756,000.00
Paku biasa 0.85000 Kg 16,000.00 13,600.00
Besi plat 1.00000 Kg 12,000.00 12,000.00
PC / Portland cement 35.00000 Kg 1,450.00 50,750.00
Pasir pasang / beton 0.15000 M3 120,000.00 18,000.00
Pasir pasang / beton 0.10000 M3 120,000.00 12,000.00
Batu pecah 2-3 cm 0.15000 M3 230,000.00 34,500.00
Batu Bata / Merah 30.00000 Bh 600.00 18,000.00
Seng Plat BJLS 30 lebar 0,90 m 0.25000 Lbr 41,000.00 10,250.00
Naco (Kerangka dan Daun ) 2.00000 Bh 240,000.00 480,000.00
Kaca Bening Uk. 3 mm 0.08000 M2 52,800.00 4,224.00
Slot ( Kunci-kunci pintu ) lokal 0.15000 Bh 60,000.00 9,000.00
Multiplek 6 mm, uk 1,20 x 2,40 m 0.06000 Lmb 99,000.00 5,940.00
Tenaga
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Tukang batu 1.00000 Oh 57,500.00 57,500.00
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.05000 Oh 68,000.00 3,400.00
284,650.00 1,601,764.00
6 1 m2 Pembuatan gudang semen dan alat-alat
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.70000 Btg 142,000.00 241,400.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.21000 M3 4,200,000.00 882,000.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
PC / Portland cement 10.50000 Kg 1,450.00 15,225.00
Pasir pasang / beton 0.03000 M3 120,000.00 3,600.00
Batu pecah 2-3 cm 0.05000 M3 230,000.00 11,500.00
Seng Gelombang Bjls 20 uk. 180 x 90 x 0,02 cm 1.50000 Lbr 46,500.00 69,750.00
Tenaga
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.05000 Oh 68,000.00 3,400.00
175,900.00 1,228,275.00
7 1 m2 Pembuatan rumah jaga/konstruksi kayu
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 3.00000 Btg 142,000.00 426,000.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.27600 M3 4,200,000.00 1,159,200.00
Paku biasa 0.70000 Kg 16,000.00 11,200.00
Seng Gelombang Bjls 20 uk. 180 x 90 x 0,02 cm 1.50000 Lbr 46,500.00 69,750.00
Tenaga
Tukang kayu 1.50000 Oh 57,500.00 86,250.00
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Kepala Tukang 0.15000 Oh 62,500.00 9,375.00
Mandor 0.05000 Oh 68,000.00 3,400.00

3
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
144,025.00 1,666,150.00
8 1 m2 Membersihkan lapangan dan perataan
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Mandor 0.05000 Oh 68,000.00 3,400.00
7,900.00 -
9 1 m2 Pembuatan bedeng buruh
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.25000 Btg 142,000.00 177,500.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.18600 M3 4,200,000.00 781,200.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
PC / Portland cement 18.00000 Kg 1,450.00 26,100.00
Pasir pasang / beton 0.03000 M3 120,000.00 3,600.00
Batu pecah 2-3 cm 0.05000 M3 230,000.00 11,500.00
Seng Gelombang Bjls 20 uk. 180 x 90 x 0,02 cm 1.50000 Lbr 46,500.00 69,750.00
Multiplek 6 mm, uk 1,20 x 2,40 m 1.35000 Lbr 99,000.00 133,650.00

4
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.05000 Oh 68,000.00 3,400.00
175,900.00 1,208,100.00
10 1 m2 Pembuatan bak adukan ukuran (40 x 50 x 20) cm
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.03600 M3 4,500,000.00 162,000.00
Paku biasa 0.08000 Kg 16,000.00 1,280.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.02100 m3 4,200,000.00 88,200.00
Tenaga
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Mandor 0.00150 Oh 68,000.00 102.00
17,352.00 251,480.00
11 1 m2 Pembuatan Stegger dari bambu ukuran (40 x 50 x 20) cm
Bahan
Bambu dia 6 - 8 cm, panjang 6 m 1.00000 Btg 10,000.00 10,000.00
Tali ijuk 0.25000 Kg 9,000.00 2,250.00
Tenaga
Tukang kayu 0.01700 Oh 57,500.00 977.50
Kepala Tukang 0.00200 Oh 62,500.00 125.00
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Mandor 0.01300 Oh 68,000.00 884.00
13,236.50 12,250.00
12 1 m2 Pembuatan jalan sementara/menuju bedeng
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 0.15000 M3 150,000.00 22,500.00
Batu pecah 5-7 cm 0.09000 M3 165,000.00 14,850.00
Pasir pasang / beton 0.01000 M3 120,000.00 1,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Mandor 0.05000 Oh 68,000.00 3,400.00
48,400.00 38,550.00
13 1 m3 Bongkaran beton bertulang
Tenaga
Pekerja / Buruh tak terlatih 6.66700 Oh 45,000.00 300,015.00
Mandor 0.33300 Oh 68,000.00 22,644.00
322,659.00 -
14 1 m3 Bongkaran dinding tembok bata merah
Tenaga
Pekerja / Buruh tak terlatih 6.66700 Oh 45,000.00 300,015.00
Mandor 0.03300 Oh 68,000.00 2,244.00
302,259.00 -
15 1 m’ Pasang pagar kawat jaring galvanis, tinggi 1,00 m
Bahan
Kawat Duri 0.43400 Lbr 1,700.00 737.80
Tenaga
Pekerja / Buruh tak terlatih 0.04200 Oh 45,000.00 1,890.00

5
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.00400 Oh 62,500.00 250.00
Tukang kayu 0.04200 Oh 57,500.00 2,415.00
Mandor 0.00200 Oh 68,000.00 136.00
4,691.00 737.80
II. PEKERJAAN TANAH

1 1 m3 Galian tanah biasa sedalam 1 meter.


Tenaga
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Mandor 0.04000 Oh 68,000.00 2,720.00
20,720.00 -
2 1 m3 Galian tanah biasa sedalam 2 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.52600 Oh 45,000.00 23,670.00
Mandor 0.05200 Oh 68,000.00 3,536.00
27,206.00 -
3 1 m3 Galian tanah biasa sedalam 3 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.73500 Oh 45,000.00 33,075.00
Mandor 0.07300 Oh 68,000.00 4,964.00
38,039.00 -
4 1 m3 Galian tanah keras sedalam 1 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.62500 Oh 45,000.00 28,125.00
Mandor 0.06200 Oh 68,000.00 4,216.00
32,341.00 -
5 1 m3 Galian tanah cadas sedalam 1 meter.
Tenaga
Pekerja / Buruh tak terlatih 1.25000 Oh 45,000.00 56,250.00
Mandor 0.12500 Oh 68,000.00 8,500.00
64,750.00 -
6 1 m3 Galian tanah lumpur sedalam 1 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.82300 Oh 45,000.00 37,035.00
Mandor 0.08300 Oh 68,000.00 5,644.00
42,679.00 -
7 1 m2 Pekerjaan stripping setinggi 1 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Mandor 0.00500 Oh 68,000.00 340.00
2,590.00 -
8 1 m3 Pembuangan tanah sejauh 150 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.51600 Oh 45,000.00 23,220.00
Mandor 0.05000 Oh 68,000.00 3,400.00
26,620.00 -
9 1 m3 Urugan kembali.
Tenaga
Pekerja / Buruh tak terlatih 0.19200 Oh 45,000.00 8,640.00

6
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.01900 Oh 68,000.00 1,292.00
9,932.00 -
10 1 m3 Pemadatan Tanah.
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Mandor 0.05000 Oh 68,000.00 3,400.00
25,900.00 -
11 1 m3 Urugan pasir.
Bahan
Pasir Urug 1.20000 M3 54,600.00 65,520.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Mandor 0.01000 Oh 68,000.00 680.00
14,180.00 65,520.00
12 1 m3 Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL.
Bahan
Pasir Urug 0.33000 M3 54,600.00 18,018.00
Kapur Batu 0.10900 M3 436,400.00 47,567.60
Tanah liat 0.76300 M3 41,000.00 31,283.00
Tenaga
Pekerja / Buruh tak terlatih 0.83300 Oh 45,000.00 37,485.00
Tukang batu 0.41600 Oh 57,500.00 23,920.00
Kepala Tukang 0.04000 Oh 62,500.00 2,500.00
Mandor 0.08300 Oh 68,000.00 5,644.00
69,549.00 96,868.60
13 1 m3 Lapisan pudel campuran 1 Kp: 5 TL.
Bahan
Kapur Batu 0.20000 M3 436,400.00 87,280.00
Tanah liat 1.00000 M3 41,000.00 41,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.83300 Oh 45,000.00 37,485.00
Tukang batu 0.41600 Oh 57,500.00 23,920.00
Kepala Tukang 0.04100 Oh 62,500.00 2,562.50
Mandor 0.08100 Oh 68,000.00 5,508.00
69,475.50 128,280.00
14 1 m3 Pemasangan lapisan ijuk.
Bahan
Ijuk 1.20000 M3 5,000.00 6,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Mandor 0.01500 Oh 68,000.00 1,020.00
7,770.00 6,000.00
15 1 m3 Urugan sirtu.
Bahan
Sirtu Urug 1.20000 M3 90,000.00 108,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Mandor 0.02500 Oh 68,000.00 1,700.00
12,950.00 108,000.00

7
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
16 1 m3 Pekerjaan Urugan tanah dan pemadatan
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Mandor 0.01000 Oh 68,000.00 680.00
Bahan :
Tanah urug 1.20000 M3 50,000.00 60,000.00
11,930.00 60,000.00
17 1 m2 Pembuatan jalan proyek/sementara, tebal 25 cm.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 0.27500 M3 150,000.00 41,250.00
Batu pecah 2-3 cm 0.03000 M3 230,000.00 6,900.00
Pasir Urug 0.05000 M3 54,600.00 2,730.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Mandor 0.10000 Oh 68,000.00 6,800.00
51,800.00 50,880.00

III. PEKERJAAN PONDASI

1 1 m3 Pasang pondasi batu kali, 1 Pc : 1 Ps


Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
PC / Portland cement 392.00000 Kg 1,450.00 568,400.00
Pasir pasang / beton 0.31400 M3 120,000.00 37,680.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 771,080.00
2 1 m3 Pasang pondasi batu kali, 1 Pc : 2 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
PC / Portland cement 267.00000 Kg 1,450.00 387,150.00
Pasir pasang / beton 0.42700 M3 120,000.00 51,240.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 603,390.00
3 1 m3 Pasang pondasi batu kali, 1 Pc : 2,5 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
PC / Portland cement 219.00000 Kg 1,450.00 317,550.00
Pasir pasang / beton 0.44200 M3 120,000.00 53,040.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00

8
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 535,590.00
4 1 m3 Pasang pondasi batu kali, 1 Pc : 3 Ps
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
PC / Portland cement 202.00000 Kg 1,450.00 292,900.00
Pasir pasang / beton 0.48500 M3 120,000.00 58,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 516,100.00
5 1 m3 Pasang pondasi batu kali, 1 Pc : 4 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
PC / Portland cement 163.00000 Kg 1,450.00 236,350.00
Pasir pasang / beton 0.52000 M3 120,000.00 62,400.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 463,750.00
6 1 m3 Pasang pondasi batu kali, 1 Pc : 5 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
PC / Portland cement 136.00000 Kg 1,450.00 197,200.00
Pasir pasang / beton 0.54400 M3 120,000.00 65,280.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 427,480.00
7 1 m3 Pasang pondasi batu kali, 1 Pc : 6 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
PC / Portland cement 117.00000 Kg 1,450.00 169,650.00
Pasir pasang / beton 0.56100 M3 120,000.00 67,320.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 401,970.00
8 1 m3 Pasang pondasi batu kali, 1 Pc : 8 Ps.
Bahan

9
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
PC / Portland cement 91.00000 Kg 1,450.00 131,950.00
Pasir pasang / beton 0.56100 M3 120,000.00 67,320.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 364,270.00
9 1 m3 Pasang pondasi batu kali, 1 Kp : 1 Sm : 1 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
Kapur Batu 0.22900 Kg 436,400.00 99,935.60
Semen Merah 0.22900 M3 119,000.00 27,251.00
Pasir pasang / beton 0.54400 M3 120,000.00 65,280.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 357,466.60
10 1 m3 Pasang pondasi batu kali, 1 Kp : 1 SM : 2 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
Kapur Batu 0.17000 Kg 436,400.00 74,188.00
Semen Merah 0.17000 M3 119,000.00 20,230.00
Pasir pasang / beton 0.34000 M3 120,000.00 40,800.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 300,218.00

10
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
11 1 m3 Pasang pondasi batu kali, 1 Pc : ¼ Kp : 4 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
PC / Portland cement 156.00000 Kg 1,450.00 226,200.00
Kapur Batu 0.03200 M3 436,400.00 13,964.80
Pasir pasang / beton 0.58400 M3 120,000.00 70,080.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 475,244.80
12 1 m3 Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
PC / Portland cement 61.00000 Kg 1,450.00 88,450.00
Kapur Batu 0.14700 M3 436,400.00 64,150.80
Pasir pasang / beton 0.49200 M3 120,000.00 59,040.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 376,640.80
13 1 m3 Pasang pondasi batu kali, ¼ Pc : 1 Kp : 4 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 150,000.00 165,000.00
PC / Portland cement 41.00000 Kg 1,450.00 59,450.00
Kapur Batu 0.13100 M3 436,400.00 57,168.40
Pasir pasang / beton 0.52300 M3 120,000.00 62,760.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 344,378.40
14 1 m3 Pasang pondasi batu kosong
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.20000 M3 150,000.00 180,000.00
Pasir Urug 0.30000 M3 54,600.00 16,380.00
Tenaga
Pekerja / Buruh tak terlatih 0.78000 Oh 45,000.00 35,100.00
Tukang batu 0.39000 Oh 57,500.00 22,425.00
Kepala Tukang 0.03900 Oh 62,500.00 2,437.50
Mandor 0.03900 Oh 68,000.00 2,652.00
62,614.50 196,380.00
15 1 m3 Pasang pondasi siklop 40% batu kali
Bahan
Besi Beton / tulangan beton 75.00000 Kg 11,000.00 825,000.00

11
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
PC / Portland cement 202.00000 Kg 1,450.00 292,900.00
Pasir pasang / beton 0.32000 M3 120,000.00 38,400.00
Batu pecah 2-3 cm 0.49000 M3 230,000.00 112,700.00
Kawat Beton / bendraat 0.80000 Kg 16,400.00 13,120.00
Tenaga
Pekerja / Buruh tak terlatih 3.00000 Oh 45,000.00 135,000.00
Tukang batu 0.85000 Oh 57,500.00 48,875.00
Kepala Tukang 0.08500 Oh 62,500.00 5,312.50
Mandor 0.15000 Oh 68,000.00 10,200.00
199,387.50 1,282,120.00
16 1 m3 Pasang pondasi sumuran diameter 100 Cm.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 0.45000 M3 150,000.00 67,500.00
PC / Portland cement 280.00000 Kg 1,450.00 406,000.00
Pasir pasang / beton 0.45000 M3 120,000.00 54,000.00
Batu pecah 2-3 cm 0.67000 M3 230,000.00 154,100.00

12
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 2.38000 Oh 45,000.00 107,100.00
Tukang batu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.08000 Oh 68,000.00 5,440.00
131,665.00 681,600.00
17 1 m' Pembuatan tiang pancang (40 X 40) Cm, beton bertulang
Bahan
Pasir Urug 0.01900 M3 54,600.00 1,037.40
Pasir pasang / beton 0.94000 M3 120,000.00 112,800.00
Batu pecah 2-3 cm 0.15000 M3 230,000.00 34,500.00
PC / Portland cement 60.50000 Kg 1,450.00 87,725.00
Besi Beton / tulangan beton 45.00000 Kg 11,000.00 495,000.00
Kawat Beton / bendraat 0.90000 Kg 16,400.00 14,760.00
Kayu bekisting 0.03200 M3 2,500,000.00 80,000.00
Paku biasa 0.12000 Kg 16,000.00 1,920.00
Minyak bekisting 0.09000 Lt 4,500.00 405.00
Plamur Tembok 0.24000 Kg 9,300.00 2,232.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang batu 0.67000 Oh 57,500.00 38,525.00
Kepala Tukang 0.06700 Oh 62,500.00 4,187.50
Mandor 0.05000 Oh 68,000.00 3,400.00
91,112.50 830,379.40
18 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang
Bahan
Pasir Urug 0.01600 M3 54,600.00 873.60
Pasir pasang / beton 0.08000 M3 120,000.00 9,600.00
Batu pecah 2-3 cm 0.12500 M3 230,000.00 28,750.00
PC / Portland cement 49.00000 Kg 1,450.00 71,050.00
Besi Beton / tulangan beton 34.50000 Kg 11,000.00 379,500.00
Kawat Beton / bendraat 0.70000 Kg 16,400.00 11,480.00
Kayu bekisting 0.02700 M3 2,500,000.00 67,500.00
Paku biasa 0.12000 Kg 16,000.00 1,920.00
Minyak bekisting 0.09000 Lt 4,500.00 405.00
Plamur Tembok 0.20000 Kg 9,300.00 1,860.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang batu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.05000 Oh 62,500.00 3,125.00
Mandor 0.04000 Oh 68,000.00 2,720.00
70,595.00 572,938.60

IV. PEKERJAAN DINDING

1 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps


Bahan
Batu Bata / Merah 140.00000 Bh 600.00 84,000.00
PC / Portland cement 64.03000 Kg 1,450.00 92,843.50

13
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pasir pasang / beton 0.05900 M3 120,000.00 7,080.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 183,923.50
2 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps.
Bahan
Batu Bata / Merah 140.00000 Bh 600.00 84,000.00
PC / Portland cement 43.50000 Kg 1,450.00 63,075.00
Pasir pasang / beton 0.08000 M3 120,000.00 9,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 156,675.00

14
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
3 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps
Bahan
Batu Bata / Merah 140.00000 Bh 600.00 84,000.00
PC / Portland cement 32.95000 Kg 1,450.00 47,777.50
Pasir pasang / beton 0.09100 M3 120,000.00 10,920.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 142,697.50
4 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps
Bahan
Batu Bata / Merah 140.00000 Bh 600.00 84,000.00
PC / Portland cement 26.55000 Kg 1,450.00 38,497.50
Pasir pasang / beton 0.09300 M3 120,000.00 11,160.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 133,657.50
5 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps
Bahan
Batu Bata / Merah 140.00000 Bh 600.00 84,000.00
PC / Portland cement 22.20000 Kg 1,450.00 32,190.00
Pasir pasang / beton 0.10200 M3 120,000.00 12,240.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 128,430.00
6 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps
Bahan
Batu Bata / Merah 140.00000 Bh 600.00 84,000.00
PC / Portland cement 18.50000 Kg 1,450.00 26,825.00
Pasir pasang / beton 0.12200 M3 120,000.00 14,640.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 125,465.00
7 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps
Bahan
Batu Bata / Merah 140.00000 Bh 600.00 84,000.00
PC / Portland cement 10.08000 Kg 1,450.00 14,616.00
Pasir pasang / beton 0.09250 M3 120,000.00 11,100.00

15
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kapur Batu 0.02750 M3 436,400.00 12,001.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 121,717.00
8 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 1 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 600.00 42,000.00
PC / Portland cement 27.80000 Kg 1,450.00 40,310.00
Pasir pasang / beton 0.02800 M3 120,000.00 3,360.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 85,670.00

16
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
9 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 2 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 600.00 42,000.00
PC / Portland cement 18.95000 Kg 1,450.00 27,477.50
Pasir pasang / beton 0.03800 M3 120,000.00 4,560.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 74,037.50
10 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 600.00 42,000.00
PC / Portland cement 14.37000 Kg 1,450.00 20,836.50
Pasir pasang / beton 0.04000 M3 120,000.00 4,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 67,636.50
11 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 4 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 600.00 42,000.00
PC / Portland cement 11.50000 Kg 1,450.00 16,675.00
Pasir pasang / beton 0.04300 M3 120,000.00 5,160.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 63,835.00
12 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 5 P
Bahan
Batu Bata / Merah 70.00000 Bh 600.00 42,000.00
PC / Portland cement 9.68000 Kg 1,450.00 14,036.00
Pasir pasang / beton 0.04500 M3 120,000.00 5,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 61,436.00

13 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 6 Ps


Bahan
Batu Bata / Merah 70.00000 Bh 600.00 42,000.00
PC / Portland cement 8.32000 Kg 1,450.00 12,064.00

17
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pasir pasang / beton 0.04900 M3 120,000.00 5,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 59,944.00
14 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 8 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 600.00 42,000.00
PC / Portland cement 6.50000 Kg 1,450.00 9,425.00
Pasir pasang / beton 0.05000 M3 120,000.00 6,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 57,425.00

18
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
15 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Kp : 10 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 600.00 42,000.00
PC / Portland cement 4.50000 Kg 1,450.00 6,525.00
Pasir pasang / beton 0.05000 M3 120,000.00 6,000.00
Kapur Batu 0.01500 M3 436,400.00 6,546.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 61,071.00
16 1 m2 Pasangan bata merah tebal ½ bata, 1 Kp : 1 Sm : 1 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 600.00 42,000.00
Semen Merah 0.01800 M3 119,000.00 2,142.00
Pasir pasang / beton 0.01800 M3 120,000.00 2,160.00
Kapur Batu 0.01800 M3 436,400.00 7,855.20
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 54,157.20
17 1 m2 Pasangan bata merah tebal ½ bata, 1 Kp : 1 Sm : 2 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 600.00 42,000.00
Semen Merah 0.01400 Kg 119,000.00 1,666.00
Pasir pasang / beton 0.02800 M3 120,000.00 3,360.00
Kapur Batu 0.01400 M3 436,400.00 6,109.60
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 53,135.60
18 1 m2 Pasangan bataco 1 Pc : 3 Psr
Tenaga
Tukang batu 1.00000 Oh 57,500.00 57,500.00
Kepala Tukang 0.10000 Oh 62,500.00 6,250.00
Pekerja / Buruh tak terlatih 3.00000 Oh 45,000.00 135,000.00
Mandor 0.12500 Oh 68,000.00 8,500.00
Bahan
Bataco 130.00000 Bj 2,400.00 312,000.00
PC / Portland cement 157.50000 Kg 1,450.00 228,375.00
Pasir pasang / beton 0.38000 M3 120,000.00 45,600.00
585,975.00 207,250.00
1m2 pasang bataco 0.10000 58,597.50 20,725.00

19
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
V. PEKERJAAN PLESTERAN

1 1 m2 Plesteran 1 Pc : 1 Ps, tebal 15 mm.


Bahan
PC / Portland cement 12.92000 Kg 1,450.00 18,734.00
Pasir pasang / beton 0.01300 M3 120,000.00 1,560.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 20,294.00
2 1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm.
Bahan
PC / Portland cement 8.52000 Kg 1,450.00 12,354.00
Pasir pasang / beton 0.01700 M3 120,000.00 2,040.00

20
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 14,394.00
3 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm.
Bahan
PC / Portland cement 6.48000 Kg 1,450.00 9,396.00
Pasir pasang / beton 0.01900 M3 120,000.00 2,280.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 11,676.00
4 1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm.
Bahan
PC / Portland cement 5.20000 Kg 1,450.00 7,540.00
Pasir pasang / beton 0.02000 M3 120,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 9,940.00
5 1 m2 Plesteran 1 Pc : 5 Ps, tebal 15 mm.
Bahan
PC / Portland cement 4.32000 Kg 1,450.00 6,264.00
Pasir pasang / beton 0.02200 M3 120,000.00 2,640.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 8,904.00
6 1 m2 Plesteran 1 Pc : 6 Ps, tebal 15 mm.
Bahan
PC / Portland cement 3.68000 Kg 1,450.00 5,336.00
Pasir pasang / beton 0.02300 M3 120,000.00 2,760.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 8,096.00
7 1 m2 Plesteran 1 Pc : 8 Ps, tebal 15 mm.
Bahan
PC / Portland cement 2.88000 Kg 1,450.00 4,176.00

21
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pasir pasang / beton 0.02400 M3 120,000.00 2,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 7,056.00
8 1 m2 Plesteran 1 Pc : 0,5 Kp : 3 Ps, tebal 15 mm.
Bahan
PC / Portland cement 5.76000 Kg 1,450.00 8,352.00
Kapur Batu 0.00300 M3 436,400.00 1,309.20
Pasir pasang / beton 0.01300 M3 120,000.00 1,560.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 11,221.20

22
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
9 1 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm.
Bahan
PC / Portland cement 1.84000 Kg 1,450.00 2,668.00
Kapur Batu 0.00600 M3 436,400.00 2,618.40
Pasir pasang / beton 0.01400 M3 120,000.00 1,680.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 6,966.40
10 1 m2 Plesteran 0,5 Pc : 1 Kp : 4 Ps, tebal 15 mm.
Bahan
PC / Portland cement 3.00000 Kg 1,450.00 4,350.00
Kapur Batu 0.00500 M3 436,400.00 2,182.00
Pasir pasang / beton 0.01900 M3 120,000.00 2,280.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 8,812.00
11 1 m2 Plesteran 1 Kp : 1 Sm : 1 Ps, tebal 15 mm.
Bahan
Semen Merah 0.00900 M3 119,000.00 1,071.00
Kapur Batu 0.00900 M3 436,400.00 3,927.60
Pasir pasang / beton 0.00900 M3 120,000.00 1,080.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 6,078.60
12 1 m2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm.
Bahan
Semen Merah 0.00700 M3 119,000.00 833.00
Kapur Batu 0.00700 M3 436,400.00 3,054.80
Pasir pasang / beton 0.01500 M3 120,000.00 1,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 5,687.80
13 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm.
Bahan
PC / Portland cement 14.28000 Kg 1,450.00 20,706.00
Pasir pasang / beton 0.02300 M3 120,000.00 2,760.00
Tenaga

23
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 23,466.00
14 1 m2 Plesteran 1 Pc : 3 Ps, tebal 20 mm.
Bahan
PC / Portland cement 10.80000 Kg 1,450.00 15,660.00
Pasir pasang / beton 0.02600 M3 120,000.00 3,120.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 18,780.00
15 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm.
Bahan
PC / Portland cement 8.68000 Kg 1,450.00 12,586.00
Pasir pasang / beton 0.02800 M3 120,000.00 3,360.00

24
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 15,946.00
16 1 m2 . Plesteran 1 Pc : 5 Ps, tebal 20 mm
Bahan
PC / Portland cement 7.29000 Kg 1,450.00 10,570.50
Pasir pasang / beton 0.02800 M3 120,000.00 3,360.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 13,930.50
17 1 m2 Plesteran 1 Pc : 6 Ps, tebal 20 mm.
Bahan
PC / Portland cement 6.24000 Kg 1,450.00 9,048.00
Pasir pasang / beton 0.03000 M3 120,000.00 3,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 12,648.00
18 1 m2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mm.
Bahan
Semen Merah 0.00900 M3 119,000.00 1,071.00
Kapur Batu 0.00900 M3 436,400.00 3,927.60
Pasir pasang / beton 0.01800 M3 120,000.00 2,160.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 7,158.60
19 1 m2 Plesteran 1 Pc : 2 Ps, tebal 25 mm.
Bahan
PC / Portland cement 15.50000 Kg 1,450.00 22,475.00
Pasir pasang / beton 0.01300 M3 120,000.00 1,560.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01300 Oh 68,000.00 884.00
27,134.00 24,035.00
20 1 m2 Plesteran 1 Pc : 3 Ps, tebal 25 mm.
Bahan

25
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01300 Oh 68,000.00 884.00
27,134.00 21,237.50
21 1 m2 Plesteran 1 Pc : 4 Ps, tebal 25 mm.
Bahan
PC / Portland cement 9.48000 Kg 1,450.00 13,746.00
Pasir pasang / beton 0.03800 M3 120,000.00 4,560.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01300 Oh 68,000.00 884.00
27,134.00 18,306.00

26
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
22 1 m2 Plesteran 1 Pc : 5 Ps, tebal 25 mm.
Bahan
PC / Portland cement 7.94000 Kg 1,450.00 11,513.00
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01300 Oh 68,000.00 884.00
27,134.00 16,193.00
23 1 m2 Plesteran 1 Pc : 2 Ps, tebal 30 mm.
Bahan
PC / Portland cement 18.65000 Kg 1,450.00 27,042.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.01500 Oh 68,000.00 1,020.00
28,482.50 31,242.50
24 1 m2 Plesteran 1 Pc : 3 Ps, tebal 30 mm.
Bahan
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.01500 Oh 68,000.00 1,020.00
31,357.50 25,197.50
25 1 m2 Plesteran 1 Pc : 4 Ps, tebal 30 mm.
Bahan
PC / Portland cement 11.38000 Kg 1,450.00 16,501.00
Pasir pasang / beton 0.04200 M3 120,000.00 5,040.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.01500 Oh 68,000.00 1,020.00
31,357.50 21,541.00
26 1 m2 Plesteran 1 Pc : 5 Ps, tebal 30 mm.
Bahan
PC / Portland cement 8.19000 Kg 1,450.00 11,875.50
Pasir pasang / beton 0.04500 M3 120,000.00 5,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.01500 Oh 68,000.00 1,020.00

27
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
31,357.50 17,275.50
27 1 m2 Berapen 1 Pc : 3 Ps, tebal 30 mm.
Bahan
PC / Portland cement 7.07000 Kg 1,450.00 10,251.50
Pasir pasang / beton 0.02100 M3 120,000.00 2,520.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00800 Oh 68,000.00 544.00
11,756.50 12,771.50
28 1 m2 Berapen 1 Pc : 5 Ps, tebal 15 mm.
Bahan
PC / Portland cement 5.67000 Kg 1,450.00 8,221.50
Pasir pasang / beton 0.02300 M3 120,000.00 2,760.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00800 Oh 68,000.00 544.00
11,756.50 10,981.50
29 1 m2 Plesteran Beton 1 Pc : 2 Ps, tebal 15 mm.
Bahan
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 120,000.00 2,160.00
Tenaga
Pekerja / Buruh tak terlatih 0.26000 Oh 45,000.00 11,700.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01300 Oh 68,000.00 884.00
25,334.00 15,645.00
30 1 m2 Plesteran Beton 1 Pc : 3 Ps, tebal 15 mm.
Bahan
PC / Portland cement 7.07000 Kg 1,450.00 10,251.50
Pasir pasang / beton 0.02100 M3 120,000.00 2,520.00
Tenaga
Pekerja / Buruh tak terlatih 0.26000 Oh 45,000.00 11,700.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01300 Oh 68,000.00 884.00
25,334.00 12,771.50
31 1 m2 Plesteran Skoning 1 Pc : 2 Ps.
Bahan
PC / Portland cement 0.50000 Kg 1,450.00 725.00
Pasir pasang / beton 0.00200 M3 120,000.00 240.00
Tenaga
Pekerja / Buruh tak terlatih 0.05700 Oh 45,000.00 2,565.00
Tukang batu 0.03800 Oh 57,500.00 2,185.00
Kepala Tukang 0.03800 Oh 62,500.00 2,375.00

28
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00200 Oh 68,000.00 136.00
7,261.00 965.00
32 1 m2 Plesteran Ciprat. 1 Pc : 2 Ps
Bahan
PC / Portland cement 4.32000 Kg 1,450.00 6,264.00
Pasir pasang / beton 0.01600 M3 120,000.00 1,920.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
18,645.00 8,184.00
33 1 m2 Plesteran siar adukan 1 pc : 2 ps
Bahan
PC / Portland cement 4.32000 Kg 1,450.00 6,264.00
Pasir pasang / beton 0.01600 M3 120,000.00 1,920.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00800 Oh 68,000.00 544.00
11,756.50 8,184.00
34 1 m' Benangan / Tali Air / Sudut Kol kolan 1 pc : 3 ps
Bahan
PC / Portland cement 1.00000 Oh 1,450.00 1,450.00
Pasir pasang / beton 0.02000 Oh 120,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Kg 45,000.00 2,250.00
Tukang batu 0.01500 M3 57,500.00 862.50
3,112.50 3,850.00

VI. PEKERJAAN KAYU

1 1 m3 Pasang kusen pintu dan jendela kayu jati eks Bojonegoro


Bahan
Kayu Jati Balok eks. Bojonegoro 1.10000 M3 23,181,900.00 25,500,090.00

29
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 20.00000 Oh 57,500.00 1,150,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,565,400.00 25,500,090.00
2 1 m3 Pasang kusen pintu dan jendela kayu jati
Bahan
Kayu Jati Balok lokal 1.10000 M3 19,200,000.00 21,120,000.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 20.00000 Oh 57,500.00 1,150,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,565,400.00 21,120,000.00
3 1 m3 Pasang kusen pintu dan jendela kayu kamper.
Bahan
Kayu Kamper Balok 1.20000 M3 10,200,000.00 12,240,000.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 12,240,000.00
4 1 m3 Pasang kusen pintu dan jendela kayu balau
Bahan
Kayu Balau Balok 1.20000 M3 9,600,000.00 11,520,000.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 11,520,000.00
5 1 m3 Pasang kusen pintu dan jendela kayu kempas
Bahan
Kayu Kempas Balok 1.20000 M3 7,800,000.00 9,360,000.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 9,360,000.00
6 1 m3 Pasang kusen pintu dan jendela kayu kruing
Bahan
Kayu Kruing Balok 1.20000 M3 7,800,000.00 9,360,000.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00

30
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 9,360,000.00
7 1 m3 Pasang kusen pintu dan jendela kayu Meranti
Bahan :
Kayu Meranti Balok 1.20000 M3 5,400,000.00 6,480,000.00
Tenaga :
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 6,480,000.00
8 1 m3 Pasang kusen pintu dan jendela kayu Akasia
Bahan :
Kayu Tahun Balok ( Mauni/ Akasia ) 1.20000 M3 4,200,000.00 5,040,000.00
Tenaga :
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 5,040,000.00
9 1 m2 Pasang pintu klamp kayu kamper
Bahan
Kayu Kamper papan 0.03600 M3 10,700,000.00 385,200.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.35000 Oh 45,000.00 15,750.00
Tukang kayu 1.05000 Oh 57,500.00 60,375.00
Kepala Tukang 0.10500 Oh 62,500.00 6,562.50
Mandor 0.01800 Oh 68,000.00 1,224.00
83,911.50 386,000.00
10 1 m2 Pasang pintu klamp kayu balau
Bahan
Kayu Balau Papan 0.03600 M3 10,100,000.00 363,600.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.35000 Oh 45,000.00 15,750.00
Tukang kayu 1.05000 Oh 57,500.00 60,375.00
Kepala Tukang 0.10500 Oh 62,500.00 6,562.50
Mandor 0.01800 Oh 68,000.00 1,224.00
83,911.50 364,400.00
11 1 m2 Pasang pintu panel kayu jati eks Bojonegoro
Bahan
Kayu Jati Papan eks. Bojonegoro 0.04000 M3 30,909,100.00 1,236,364.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 1,236,364.00

31
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
12 1 m2 Pasang pintu panel kayu jati
Bahan
Kayu jati papan lokal 0.04000 M3 19,800,000.00 792,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 792,000.00
13 1 m2 Pasang pintu panel kayu kanfer
Bahan
Kayu Kamper papan 0.04000 M3 10,700,000.00 428,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 428,000.00
14 1 m2 Pasang pintu panel kayu balau
Bahan
Kayu Balau Papan 0.04000 M3 10,100,000.00 404,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 404,000.00
15 1 m2 Pasang pintu panel kayu Kruing
Bahan :
Kayu Kruing Papan 0.04000 M3 8,300,000.00 332,000.00
Tenaga :
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 332,000.00
16 1 m2 Pasang pintu panel kayu Kempas
Bahan :
Kayu Kempas Papan 0.04000 M3 8,300,000.00 332,000.00

32
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga :
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 332,000.00
17 1 m2 Pasang pintu panel kayu Meranti
Bahan :
Kayu Meranti Papan 0.04000 M3 5,900,000.00 236,000.00
Tenaga :
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 236,000.00
18 1 m2 Pasang pintu panel kayu Akasia
Bahan :
Kayu Tahun papan ( Mauni/akasia) 0.04000 M3 4,500,000.00 180,000.00
Tenaga :
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 180,000.00
19 1 m2 Pasang pintu dan jendela kaca kayu jati eks Bojonegoro
Bahan
Kayu Jati Papan eks. Bojonegoro 0.03500 M3 30,909,100.00 1,081,818.50
Kaca Bening Uk. 5 mm 0.48000 m2 54,000.00 25,920.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 1,107,738.50
20 1 m2 Pasang pintu dan jendela kaca kayu jati
Bahan
Kayu jati papan lokal 0.03500 M3 19,800,000.00 693,000.00
Kaca Bening Uk. 5 mm 0.48000 m2 54,000.00 25,920.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 718,920.00
21 1 m2 Pasang pintu dan jendela kaca kayu kamper
Bahan
Kayu Kamper papan 0.03500 M3 10,700,000.00 374,500.00
Kaca Bening Uk. 5 mm 0.48000 m2 54,000.00 25,920.00
Tenaga

33
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 400,420.00
22 1 m2 Pasang pintu dan jendela kaca kayu balau
Bahan
Kayu Balau Papan 0.03500 M3 10,100,000.00 353,500.00
Kaca Bening Uk. 5 mm 0.48000 m2 54,000.00 25,920.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 379,420.00
23 1 m2 Pasang pintu dan jendela kaca kayu kempas
Bahan
Kayu Kempas Papan 0.03500 M3 8,300,000.00 290,500.00
Kaca Bening Uk. 5 mm 0.48000 m2 54,000.00 25,920.00

34
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 316,420.00
24 1 m2 Pasang pintu dan jendela kaca kayu kruing
Bahan
Kayu Kruing Papan 0.03500 M3 8,300,000.00 290,500.00
Kaca Bening Uk. 5 mm 0.48000 m2 54,000.00 25,920.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 316,420.00
25 1 m2 Pasang pintu dan jendela kaca kayu meranti
Bahan
Kayu Meranti Papan 0.03500 M3 5,900,000.00 206,500.00
Kaca Bening Uk. 5 mm 0.48000 m2 54,000.00 25,920.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 232,420.00
26 1 m2 Pasang pintu dan jendela kaca kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.03500 M3 4,500,000.00 157,500.00
Kaca Bening Uk. 5 mm 0.48000 m2 54,000.00 25,920.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 183,420.00
27 1 m2 Pasang pintu dan jendela jalusi kayu jati eks Bojonegoro
Bahan
Kayu Jati Papan eks. Bojonegoro 0.06400 M3 30,909,100.00 1,978,182.40
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.30000 Oh 68,000.00 20,400.00
256,650.00 1,978,182.40
28 1 m2 Pasang pintu dan jendela jalusi kayu jati
Bahan
Kayu jati papan lokal 0.06400 M3 19,800,000.00 1,267,200.00
Tenaga

35
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.30000 Oh 68,000.00 20,400.00
256,650.00 1,267,200.00
29 1 m2 Pasang pintu dan jendela jalusi kayu kamper
Bahan
Kayu Kamper papan 0.06400 M3 10,700,000.00 684,800.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00
270,250.00 684,800.00
30 1 m2 Pasang pintu dan jendela jalusi kayu balau
Bahan
Kayu Balau Papan 0.06400 M3 10,100,000.00 646,400.00

36
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00
270,250.00 646,400.00
31 1 m2 Pasang pintu dan jendela jalusi kayu kruing
Bahan
Kayu Kruing Papan 0.06400 M3 8,300,000.00 531,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00
270,250.00 531,200.00
32 1 m2 Pasang pintu dan jendela jalusi kayu kempas
Bahan
Kayu Kempas Papan 0.06400 M3 8,300,000.00 531,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00
270,250.00 531,200.00
33 1 m2 Pasang pintu dan jendela jalusi kayu meranti
Bahan
Kayu Meranti Papan 0.06400 M3 5,900,000.00 377,600.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00
270,250.00 377,600.00
34 1 m2 Pasang pintu dan jendela jalusi kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.06400 M3 4,500,000.00 288,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00
270,250.00 288,000.00
35 1 m2 Pasang jalusi mati kusen kayu jati eks Bojonegoro
Bahan
Kayu Jati Papan eks. Bojonegoro 0.06000 M3 30,909,100.00 1,854,546.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00

37
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 1,856,946.00
36 1 m2 Pasang jalusi mati kusen kayu jati
Bahan
Kayu jati papan lokal 0.06000 M3 19,800,000.00 1,188,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 1,190,400.00
37 1 m2 Pasang jalusi mati kusen kayu kanfer
Bahan
Kayu Kamper papan 0.06000 M3 10,700,000.00 642,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00

38
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 644,400.00
38 1 m2 Pasang jalusi mati kusen kayu balau
Bahan
Kayu Balau Papan 0.06000 M3 10,100,000.00 606,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 608,400.00
39 1 m2 Pasang jalusi mati kusen kayu kempas
Bahan
Kayu Kempas Papan 0.06000 M3 8,300,000.00 498,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 500,400.00
40 1 m2 Pasang jalusi mati kusen kayu kruing
Bahan
Kayu Kruing Papan 0.06000 M3 8,300,000.00 498,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 500,400.00
41 1 m2 Pasang jalusi mati kusen kayu meranti
Bahan
Kayu Meranti Papan 0.06000 M3 5,900,000.00 354,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 356,400.00
42 1 m2 Pasang jalusi mati kusen kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.06000 M3 4,500,000.00 270,000.00

39
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 272,400.00
43 1 m2 Pasang pintu plywood rangkap, rangka kayu jati
Bahan
Kayu jati papan lokal 0.01960 M3 19,800,000.00 388,080.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 454,260.00

40
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
44 1 m2 Pasang pintu plywood rangkap, rangka kayu kamper
Bahan
Kayu Kamper papan 0.01960 M3 10,700,000.00 209,720.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 275,900.00
45 1 m2 Pasang pintu plywood rangkap, rangka kayu balau
Bahan
Kayu Balau Papan 0.01960 M3 10,100,000.00 197,960.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 264,140.00
46 1 m2 Pasang pintu plywood rangkap, rangka kayu kempas
Bahan
Kayu Kempas Papan 0.01960 M3 8,300,000.00 162,680.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 228,860.00
47 1 m2 Pasang pintu plywood rangkap, rangka kayu kruing
Bahan
Kayu Kruing Papan 0.01960 M3 8,300,000.00 162,680.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 228,860.00
48 1 m2 Pasang pintu plywood rangkap, rangka kayu meranti

41
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
Kayu Meranti Papan 0.01960 M3 5,900,000.00 115,640.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 181,820.00
49 1 m2 Pasang pintu plywood rangkap, rangka kayu akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01960 M3 4,500,000.00 88,200.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00

42
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 154,380.00
50 1 m2 Pasang pintu teakwood rangkap, rangka kayu jati
Bahan
Kayu Jati Papan lokal 0.01960 M3 19,800,000.00 388,080.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 495,180.00
51 1 m2 Pasang pintu teakwood rangkap, rangka kayu kamper
Bahan
Kayu Kamper Papan 0.01960 M3 10,700,000.00 209,720.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 316,820.00
52 1 m2 Pasang pintu teakwood rangkap, rangka kayu balau
Bahan
Kayu Balau Papan 0.01960 M3 10,100,000.00 197,960.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 305,060.00
53 1 m2 Pasang pintu teakwood rangkap, rangka kayu kempas
Bahan
Kayu Kempas Papan 0.01960 M3 8,300,000.00 162,680.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Tenaga

43
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 269,780.00
54 1 m2 Pasang pintu teakwood rangkap, rangka kayu kruing
Bahan
Kayu Kruing Papan 0.01960 M3 8,300,000.00 162,680.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 269,780.00

44
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
55 1 m2 Pasang pintu teakwood rangkap, rangka kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01960 M3 4,500,000.00 88,200.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 11,000.00 3,300.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 195,300.00
56 1 m2 Pasang pintu plywood & formika, rangka kayu jati
Bahan
Kayu jati papan lokal 0.01960 M3 19,800,000.00 388,080.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 587,830.00
57 1 m2 Pasang pintu plywood & formika rangka kayu kamper
Bahan
Kayu Kamper papan 0.01960 M3 10,700,000.00 209,720.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 409,470.00
58 1 m2 Pasang pintu plywood & formika rangka kayu balau
Bahan
Kayu Balau Papan 0.01960 M3 10,100,000.00 197,960.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00

45
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 397,710.00
59 1 m2 Pasang pintu plywood & formika rangka kayu kempas
Bahan
Kayu Kempas Papan 0.01960 M3 8,300,000.00 162,680.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 362,430.00

46
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
60 1 m2 Pasang pintu plywood & formika rangka kayu kruing
Bahan
Kayu Kruing Papan 0.01960 M3 8,300,000.00 162,680.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 362,430.00
61 1 m2 Pasang pintu plywood & formika rangka kayu meranti
Bahan
Kayu Meranti Papan 0.01960 M3 5,900,000.00 115,640.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 315,390.00
62 1 m2 Pasang pintu plywood & formika rangka kayu akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01960 M3 4,500,000.00 88,200.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 287,950.00
63 1 m2 Pasang pintu teakwood & formika rangka kayu jati ( divernis )
Bahan
Kayu jati papan lokal 0.01960 M3 19,800,000.00 388,080.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 99,000.00 49,500.00
Vernis 0.50000 Lbr 32,800.00 16,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00

47
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 591,330.00
64 1 m2 Pasang pintu teakwood & formika rangka kayu kamper ( divernis )
Bahan
Kayu Kamper papan 0.01960 M3 10,700,000.00 209,720.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 99,000.00 49,500.00
Vernis 0.50000 Lt 32,800.00 16,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 412,970.00

48
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
65 1 m2 Pasang pintu teakwood & formika rangka kayu balau ( divernis )
Bahan
Kayu Balau Papan 0.01960 M3 10,100,000.00 197,960.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 99,000.00 49,500.00
Vernis 0.50000 Lt 32,800.00 16,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 401,210.00
66 1 m2 Pasang pintu teakwood & formika rangka kayu kempas ( divernis )
Bahan
Kayu Kempas Papan 0.01960 M3 8,300,000.00 162,680.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 99,000.00 49,500.00
Vernis 0.50000 Lt 32,800.00 16,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 365,930.00
67 1 m2 Pasang pintu teakwood & formika rangka kayu kruing ( divernis )
Bahan
Kayu Kruing Papan 0.01960 M3 8,300,000.00 162,680.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 99,000.00 49,500.00
Vernis 0.50000 Lt 32,800.00 16,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 365,930.00
68 1 m2 Pasang pintu teakwood & formika rangka kayu meranti ( divernis )
Bahan
Kayu Meranti Papan 0.01960 M3 5,900,000.00 115,640.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 99,000.00 49,500.00
Vernis 0.50000 Lt 32,800.00 16,400.00

49
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 318,890.00
69 1 m2 Pasang pintu teakwood & formika rangka kayu akasia ( divernis )
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01960 M3 4,500,000.00 88,200.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 11,000.00 8,800.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 99,000.00 49,500.00
Vernis 0.50000 Lt 32,800.00 16,400.00
Formika 0.50000 Lbr 247,500.00 123,750.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 291,450.00

50
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
70 1 m2 Pasang pintu formika double, rangka kayu jati
Bahan
Kayu jati papan lokal 0.01960 M3 19,800,000.00 388,080.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 11,000.00 13,200.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Formika 1.00000 Lbr 247,500.00 247,500.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 752,580.00
71 1 m2 Pasang pintu formika double, rangka kayu kamper
Bahan
Kayu Kamper Papan 0.01960 M3 10,700,000.00 209,720.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 11,000.00 13,200.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Formika 1.00000 Lbr 247,500.00 247,500.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 574,220.00
72 1 m2 Pasang pintu formika double, rangka kayu balau
Bahan
Kayu Balau Papan 0.01960 M3 10,100,000.00 197,960.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 11,000.00 13,200.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Formika 1.00000 Lbr 247,500.00 247,500.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 562,460.00
73 1 m2 Pasang pintu formika double, rangka kayu kempas
Bahan
Kayu Kempas Papan 0.01960 M3 8,300,000.00 162,680.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 11,000.00 13,200.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Formika 1.00000 Lbr 247,500.00 247,500.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00

51
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 527,180.00
74 1 m2 Pasang pintu formika double, rangka kayu kruing
Bahan
Kayu Kruing Papan 0.01960 M3 8,300,000.00 162,680.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 11,000.00 13,200.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Formika 1.00000 Lbr 247,500.00 247,500.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 527,180.00

52
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
75 1 m2 Pasang pintu formika double, rangka kayu meranti
Bahan
Kayu Meranti Papan 0.01960 M3 5,900,000.00 115,640.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 11,000.00 13,200.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Formika 1.00000 Lbr 247,500.00 247,500.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 480,140.00
76 1 m2 Pasang pintu formika double, rangka kayu akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01960 M3 4,500,000.00 88,200.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 11,000.00 13,200.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Formika 1.00000 Lbr 247,500.00 247,500.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 452,700.00
77 1 m3 Pasang konstruksi kuda-kuda kayu jati
Bahan
Kayu Jati Balok lokal 1.10000 M3 19,200,000.00 21,120,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 21,378,800.00
78 1 m3 Pasang konstruksi kuda-kuda kayu kamper
Bahan
Kayu Kamper Balok 1.10000 M3 10,200,000.00 11,220,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 11,478,800.00
79 1 m3 Pasang konstruksi kuda-kuda kayu balau

53
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
Kayu Balau Balok 1.10000 M3 9,600,000.00 10,560,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 10,818,800.00
80 1 m3 Pasang konstruksi kuda-kuda kayu kempas
Bahan
Kayu Kempas Balok 1.10000 M3 7,800,000.00 8,580,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 8,838,800.00

54
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
81 1 m3 Pasang konstruksi kuda-kuda kayu kruing
Bahan
Kayu Kruing Balok 1.10000 M3 7,800,000.00 8,580,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 8,838,800.00
82 1 m3 Pasang konstruksi kuda-kuda kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 1.10000 M3 4,200,000.00 4,620,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 4,878,800.00
83 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu jati
Bahan :
Kayu Jati Balok lokal 1.10000 M3 19,200,000.00 21,120,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 21,414,000.00
84 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu kanfer
Bahan :
Kayu Kamper Balok 1.10000 M3 10,200,000.00 11,220,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 11,514,000.00
85 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Balau
Bahan :
Kayu Balau Balok 1.10000 M3 9,600,000.00 10,560,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00

55
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 10,854,000.00
86 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Kempas
Bahan :
Kayu Kempas Balok 1.10000 M3 7,800,000.00 8,580,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 8,874,000.00

56
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
87 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Kruing
Bahan :
Kayu Kruing Balok 1.10000 M3 7,800,000.00 8,580,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 8,874,000.00
88 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Meranti
Bahan :
Kayu Meranti Balok 1.10000 M3 5,400,000.00 5,940,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 6,234,000.00
89 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Akasia
Bahan :
Kayu Tahun Balok ( Mauni/ Akasia ) 1.10000 M3 4,200,000.00 4,620,000.00
Besi Beugel/Baut 15.00000 Kg 16,400.00 246,000.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 4,914,000.00
90 1 m2 Pasang kaso + reng genteng kodok kayu jati
Bahan
Kayu Jati Balok lokal 0.00700 M3 19,200,000.00 134,400.00
Kayu Jati Balok lokal 0.00500 M3 19,200,000.00 96,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 232,800.00
91 1 m2 Pasang kaso + reng genteng kodok kayu kamper
Bahan
Kayu Kamper Balok 0.00700 M3 10,200,000.00 71,400.00
Kayu Kamper Balok 0.00500 M3 10,200,000.00 51,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00

57
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 124,800.00
92 1 m2 Pasang kaso + reng genteng kodok kayu balau
Bahan
Kayu Balau Balok 0.00700 M3 9,600,000.00 67,200.00
Kayu Balau Balok 0.00500 M3 9,600,000.00 48,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 117,600.00

58
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
93 1 m2 Pasang kaso + reng genteng kodok kayu kempas
Bahan
Kayu Kempas Balok 0.00700 M3 7,800,000.00 54,600.00
Kayu Kempas Balok 0.00500 M3 7,800,000.00 39,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 96,000.00
94 1 m2 Pasang kaso + reng genteng kodok kayu kruing
Bahan
Kayu Kruing Balok 0.00700 M3 7,800,000.00 54,600.00
Kayu Kruing Balok 0.00500 M3 7,800,000.00 39,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 96,000.00
95 1 m2 Pasang kaso + reng genteng kodok kayu meranti
Bahan
Kayu Meranti Balok 0.00700 M3 5,400,000.00 37,800.00
Kayu Meranti Balok 0.00500 M3 5,400,000.00 27,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 67,200.00
96 1 m2 Pasang kaso + reng genteng kodok kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.00700 M3 4,200,000.00 29,400.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.00500 M3 4,200,000.00 21,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 52,800.00
97 1 m2 Pasang kaso + reng genteng MKP lokal kayu jati
Bahan
Kayu Jati Balok lokal 0.00700 M3 19,200,000.00 134,400.00
Kayu Jati Balok lokal 0.00500 M3 19,200,000.00 96,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00

59
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 232,800.00
98 1 m2 Pasang kaso + reng genteng MKP lokal kayu kamper
Bahan
Kayu Kamper Balok 0.00700 M3 10,200,000.00 71,400.00
Kayu Kamper Balok 0.00500 M3 10,200,000.00 51,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 124,800.00

60
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
99 1 m2 Pasang kaso + reng genteng MKP lokal kayu balau
Bahan
Kayu Balau Balok 0.00700 M3 9,600,000.00 67,200.00
Kayu Balau Balok 0.00500 M3 9,600,000.00 48,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 117,600.00
100 1 m2 Pasang kaso + reng genteng MKP lokal kayu kempas
Bahan
Kayu Kempas Balok 0.00700 M3 7,800,000.00 54,600.00
Kayu Kempas Balok 0.00500 M3 7,800,000.00 39,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 96,000.00
101 1 m2 Pasang kaso + reng genteng MKP lokal kayu kruing
Bahan
Kayu Kruing Balok 0.00700 M3 7,800,000.00 54,600.00
Kayu Kruing Balok 0.00500 M3 7,800,000.00 39,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 96,000.00
102 1 m2 Pasang kaso + reng genteng MKP lokal kayu meranti
Bahan
Kayu Meranti Balok 0.00700 M3 5,400,000.00 37,800.00
Kayu Meranti Balok 0.00500 M3 5,400,000.00 27,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 67,200.00
103 1 m2 Pasang kaso + reng genteng MKP lokal kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.00700 M3 4,200,000.00 29,400.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.00500 M3 4,200,000.00 21,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00

61
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 52,800.00
104 1 m2 Pasang kaso + reng genteng monier kayu jati
Bahan
Kayu Jati Balok lokal 0.01400 M3 19,200,000.00 268,800.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 271,200.00
105 1 m2 Pasang kaso + reng genteng monier kayu kamper
Bahan
Kayu Kamper Balok 0.01400 M3 10,200,000.00 142,800.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00

62
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 145,200.00
106 1 m2 Pasang kaso + reng genteng monier kayu balau
Bahan
Kayu Balau Balok 0.01400 M3 9,600,000.00 134,400.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 136,800.00
107 1 m2 Pasang kaso + reng genteng monier kayu kempas
Bahan
Kayu Kempas Balok 0.01400 M3 7,800,000.00 109,200.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 111,600.00
108 1 m2 Pasang kaso + reng genteng monier kayu kruing
Bahan
Kayu Kruing Balok 0.01400 M3 7,800,000.00 109,200.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 111,600.00
109 1 m2 Pasang kaso + reng genteng monier kayu meranti
Bahan
Kayu Meranti Balok 0.01400 M3 5,400,000.00 75,600.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 78,000.00
110 1 m2 Pasang kaso + reng genteng monier kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01400 M3 4,200,000.00 58,800.00

63
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 61,200.00
111 1 m2 Pasang kaso + reng genteng beton kayu jati
Bahan
Kayu Jati Balok lokal 0.01400 M3 19,200,000.00 268,800.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 271,200.00

64
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
112 1 m2 Pasang kaso + reng genteng beton kayu kanfer
Bahan
Kayu Kamper Balok 0.01400 M3 10,200,000.00 142,800.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 145,200.00
113 1 m2 Pasang kaso + reng genteng beton kayu balau
Bahan
Kayu Balau Balok 0.01400 M3 9,600,000.00 134,400.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 136,800.00
114 1 m2 Pasang kaso + reng genteng beton kayu kempas
Bahan
Kayu Kempas Balok 0.01400 M3 7,800,000.00 109,200.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 111,600.00
115 1 m2 Pasang kaso + reng genteng beton kayu kruing
Bahan
Kayu Kruing Balok 0.01400 M3 7,800,000.00 109,200.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 111,600.00
116 1 m2 Pasang kaso + reng genteng beton kayu meranti
Bahan
Kayu Meranti Balok 0.01400 M3 5,400,000.00 75,600.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00

65
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
11,215.00 78,000.00
117 1 m2 Pasang kaso + reng genteng beton kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01400 M3 4,200,000.00 58,800.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 61,200.00
118 1 m2 Pasang kaso + reng atap sirap kayu jati
Bahan
Kayu Jati Balok lokal 0.16500 M3 19,200,000.00 3,168,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 3,171,200.00
119 1 m2 Pasang kaso + reng atap sirap kayu kamper
Bahan
Kayu Kamper Balok 0.16500 M3 10,200,000.00 1,683,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 1,686,200.00
120 1 m2 Pasang kaso + reng atap sirap kayu balau
Bahan
Kayu Balau Balok 0.16500 M3 9,600,000.00 1,584,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 1,587,200.00
121 1 m2 Pasang kaso + reng atap sirap kayu kempas
Bahan
Kayu Kempas Balok 0.16500 M3 7,800,000.00 1,287,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00

66
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 1,290,200.00
122 1 m2 Pasang kaso + reng atap sirap kayu kruing
Bahan
Kayu Kruing Balok 0.16500 M3 7,800,000.00 1,287,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 1,290,200.00
123 1 m2 Pasang kaso + reng atap sirap kayu meranti
Bahan
Kayu Meranti Balok 0.16500 M3 5,400,000.00 891,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 894,200.00
124 1 m2 Pasang kaso + reng atap sirap kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.16500 M3 4,200,000.00 693,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 696,200.00
125 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu jati
Bahan
Kayu Jati Balok lokal 0.01200 M3 19,200,000.00 230,400.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 232,000.00
126 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kamper
Bahan
Kayu Kamper Balok 0.01200 M3 10,200,000.00 122,400.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00

67
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 124,000.00
127 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu balau
Bahan
Kayu Balau Balok 0.01200 M3 9,600,000.00 115,200.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 116,800.00
128 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kempas
Bahan
Kayu Kempas Balok 0.01200 M3 7,800,000.00 93,600.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 95,200.00
129 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kruing
Bahan
Kayu Kruing Balok 0.01200 M3 7,800,000.00 93,600.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 95,200.00
130 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu meranti
Bahan
Kayu Meranti Balok 0.01200 M3 5,400,000.00 64,800.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 66,400.00
131 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01200 M3 4,200,000.00 50,400.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00

68
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 52,000.00
132 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu jati
Bahan
Kayu Jati Balok lokal 0.02300 M3 19,200,000.00 441,600.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 444,000.00
133 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kamper
Bahan
Kayu Kamper Balok 0.02300 M3 10,200,000.00 234,600.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 237,000.00
134 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu balau
Bahan
Kayu Balau Balok 0.02300 M3 9,600,000.00 220,800.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 223,200.00
135 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kempas
Bahan
Kayu Kempas Balok 0.02300 M3 7,800,000.00 179,400.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 181,800.00
136 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kruing
Bahan
Kayu Kruing Balok 0.02300 M3 7,800,000.00 179,400.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga

69
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 181,800.00
137 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu meranti
Bahan
Kayu Meranti Balok 0.02300 M3 5,400,000.00 124,200.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 126,600.00
138 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.02300 M3 4,200,000.00 96,600.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 99,000.00
139 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu jati
Bahan
Kayu Jati Balok lokal 0.02700 M3 19,200,000.00 518,400.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 521,600.00
140 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kamper
Bahan
Kayu Kamper Balok 0.02700 M3 10,200,000.00 275,400.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 278,600.00
141 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu balau
Bahan
Kayu Balau Balok 0.02700 M3 9,600,000.00 259,200.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00

70
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 262,400.00
142 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kempas
Bahan
Kayu Kempas Balok 0.02700 M3 7,800,000.00 210,600.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 213,800.00
143 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kruing
Bahan
Kayu Kruing Balok 0.02700 M3 7,800,000.00 210,600.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 213,800.00
144 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu meranti
Bahan
Kayu Meranti Balok 0.02700 M3 5,400,000.00 145,800.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 149,000.00
145 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.02700 M3 4,200,000.00 113,400.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 116,600.00
146 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu jati.
Bahan
Kayu jati papan lokal 0.00720 M3 19,800,000.00 142,560.00

71
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00500 Oh 68,000.00 340.00
17,902.50 143,360.00
147 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kamper
Bahan
Kayu Kamper papan 0.00720 M3 10,700,000.00 77,040.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00500 Oh 68,000.00 340.00
17,590.00 77,840.00
148 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu balau
Bahan
Kayu Balau Papan 0.00720 M3 10,100,000.00 72,720.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00500 Oh 68,000.00 340.00
17,902.50 73,520.00
149 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kempas
Bahan
Kayu Kempas Papan 0.00720 M3 8,300,000.00 59,760.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00500 Oh 68,000.00 340.00
17,590.00 60,560.00
150 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kruing
Bahan
Kayu Kruing Papan 0.00720 M3 8,300,000.00 59,760.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00500 Oh 68,000.00 340.00
17,902.50 60,560.00
151 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu meranti
Bahan

72
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kayu Meranti Papan 0.00720 M3 5,900,000.00 42,480.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00500 Oh 68,000.00 340.00
17,590.00 43,280.00
152 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.00720 M3 4,500,000.00 32,400.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00500 Oh 68,000.00 340.00
17,590.00 33,200.00
153 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu jati
Bahan
Kayu jati papan lokal 0.01100 M3 19,800,000.00 217,800.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 218,600.00
154 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kamper
Bahan
Kayu Kamper papan 0.01100 M3 10,700,000.00 117,700.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 118,500.00
155 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu balau
Bahan
Kayu Balau Papan 0.01100 M3 10,100,000.00 111,100.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 111,900.00
156 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kempas

73
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
Kayu Kempas Papan 0.01100 M3 8,300,000.00 91,300.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 92,100.00
157 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kruing
Bahan
Kayu Kruing Papan 0.01100 M3 8,300,000.00 91,300.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 92,100.00
158 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu meranti
Bahan
Kayu Meranti Papan 0.01100 M3 5,900,000.00 64,900.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 65,700.00
159 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01100 M3 4,500,000.00 49,500.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 50,300.00
160 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu jati
Bahan
Kayu jati papan lokal 0.01450 M3 19,800,000.00 287,100.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 288,060.00

74
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
161 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kamper
Bahan
Kayu Kamper papan 0.01450 M3 10,700,000.00 155,150.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 156,110.00
162 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu balau
Bahan
Kayu Balau Papan 0.01450 M3 10,100,000.00 146,450.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 147,410.00
163 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kempas
Bahan
Kayu Kempas Papan 0.01450 M3 8,300,000.00 120,350.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 121,310.00
164 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kruing
Bahan
Kayu Kruing Papan 0.01450 M3 8,300,000.00 120,350.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 121,310.00
165 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu meranti
Bahan
Kayu Meranti Papan 0.01450 M3 5,900,000.00 85,550.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00

75
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
27,787.50 86,510.00
166 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01450 M3 4,500,000.00 65,250.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 66,210.00
167 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu jati
Bahan
Kayu jati papan lokal 0.00860 M3 19,800,000.00 170,280.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 171,240.00
168 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kanfer
Bahan
Kayu Kamper papan 0.00860 M3 10,700,000.00 92,020.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 92,980.00
169 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu balau
Bahan
Kayu Balau Papan 0.00860 M3 10,100,000.00 86,860.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 87,820.00
170 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kempas
Bahan
Kayu Kempas Papan 0.00860 M3 8,300,000.00 71,380.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00

76
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 72,340.00
171 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kruing
Bahan
Kayu Kruing Papan 0.00860 M3 8,300,000.00 71,380.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 72,340.00
172 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu meranti
Bahan
Kayu Meranti Papan 0.00860 M3 5,900,000.00 50,740.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 51,700.00
173 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.00860 M3 4,500,000.00 38,700.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 39,660.00
174 1 m2 Pasang rangka dinding pemisah kayu jati
Bahan
Kayu Jati Balok lokal 0.01950 M3 19,200,000.00 374,400.00
Kayu jati papan lokal 0.00700 M3 19,800,000.00 138,600.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00

77
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 514,600.00
175 1 m2 Pasang rangka dinding pemisah kayu kanfer
Bahan
Kayu Kamper Balok 0.01950 M3 10,200,000.00 198,900.00
Kayu Kamper papan 0.00700 M3 10,700,000.00 74,900.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 275,400.00
176 1 m2 Pasang rangka dinding pemisah kayu balau
Bahan
Kayu Balau Balok 0.01950 M3 9,600,000.00 187,200.00
Kayu Balau Papan 0.00700 M3 10,100,000.00 70,700.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 259,500.00
177 1 m2 Pasang rangka dinding pemisah kayu kempas
Bahan
Kayu Kempas Balok 0.01950 M3 7,800,000.00 152,100.00
Kayu Kempas Papan 0.00700 M3 8,300,000.00 58,100.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 211,800.00
178 1 m2 Pasang rangka dinding pemisah kayu kruing
Bahan
Kayu Kruing Balok 0.01950 M3 7,800,000.00 152,100.00
Kayu Kruing Papan 0.00700 M3 8,300,000.00 58,100.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00

78
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
40,537.50 211,800.00
179 1 m2 Pasang rangka dinding pemisah kayu meranti
Bahan
Kayu Meranti Balok 0.01950 M3 5,400,000.00 105,300.00
Kayu Meranti Papan 0.00700 M3 5,900,000.00 41,300.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 148,200.00
180 1 m2 Pasang rangka dinding pemisah kayu tahun / akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01950 M3 4,200,000.00 81,900.00
Kayu Tahun papan ( Mauni/akasia) 0.00700 M3 4,500,000.00 31,500.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00

79
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 115,000.00
181 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu jati
Bahan
Kayu Jati Balok lokal 0.01950 M3 19,200,000.00 374,400.00
Kayu jati papan lokal 0.00700 M3 19,800,000.00 138,600.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 11,000.00 6,160.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 619,760.00
182 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kamper
Bahan
Kayu Kamper Balok 0.01950 M3 10,200,000.00 198,900.00
Kayu Kamper papan 0.00700 M3 10,700,000.00 74,900.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 11,000.00 6,160.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 62,400.00 62,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 343,960.00
183 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu balau
Bahan
Kayu Balau Balok 0.01950 M3 9,600,000.00 187,200.00
Kayu Balau Papan 0.00700 M3 10,100,000.00 70,700.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 11,000.00 6,160.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 364,660.00
184 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kempas
Bahan
Kayu Kempas Balok 0.01950 M3 7,800,000.00 152,100.00
Kayu Kempas Papan 0.00700 M3 8,300,000.00 58,100.00

80
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 11,000.00 6,160.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 316,960.00
185 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kruing
Bahan
Kayu Kruing Balok 0.01950 M3 7,800,000.00 152,100.00
Kayu Kruing Papan 0.00700 M3 8,300,000.00 58,100.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 11,000.00 6,160.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00

81
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 316,960.00
186 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu meranti
Bahan
Kayu Meranti Balok 0.01950 M3 5,400,000.00 105,300.00
Kayu Meranti Papan 0.00700 M3 5,900,000.00 41,300.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 11,000.00 6,160.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 253,360.00
187 1 m2 Pasang dinding pemisah plywood rangkap, rangka Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01950 M3 4,200,000.00 81,900.00
Kayu Tahun papan ( Mauni/akasia) 0.00700 M3 4,500,000.00 31,500.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 11,000.00 6,160.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 99,000.00 99,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 220,160.00
188 1 m2 Pasang dinding lambriziring dari papan jati
Bahan
Kayu Jati Papan lokal 0.00700 M3 19,800,000.00 138,600.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 600.00 90.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 140,290.00
189 1 m2 Pasang dinding lambriziring dari papan kanfer
Bahan
Kayu Kamper Papan 0.00700 M3 10,700,000.00 74,900.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 600.00 90.00
Tenaga

82
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 76,590.00
190 1 m2 Pasang dinding lambriziring dari papan balau
Bahan
Kayu Balau Papan 0.00700 M3 10,100,000.00 70,700.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 600.00 90.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 72,390.00
191 1 m2 Pasang dinding lambriziring dari papan kempas
Bahan
Kayu Kempas Papan 0.00700 M3 8,300,000.00 58,100.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 600.00 90.00

83
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 59,790.00
192 1 m2 Pasang dinding lambriziring dari papan kruing
Bahan
Kayu Kruing Papan 0.00700 M3 8,300,000.00 58,100.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 600.00 90.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 59,790.00
193 1 m2 Pasang dinding lambriziring dari papan meranti
Bahan
Kayu Meranti Papan 0.00700 M3 5,900,000.00 41,300.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 600.00 90.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 42,990.00
194 1 m2 Pasang dinding lambriziring dari papan akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.00700 M3 4,500,000.00 31,500.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 600.00 90.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 33,190.00
195 1 m2 Pasang plywood tebal 4 mm, untuk dinding
Bahan
Playwood ( 120 x 240 ) cm, tbl. 4 mm 0.40000 Lbr 62,400.00 24,960.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.02500 Oh 45,000.00 1,125.00
Tukang kayu 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00750 Oh 62,500.00 468.75
Mandor 0.00130 Oh 68,000.00 88.40
5,994.65 25,760.00

84
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
196 1 m’ Pasang list plafond -kayu profil
Bahan
List Eternit ( kayu ) 1.05000 M’ 3,000.00 3,150.00
Paku biasa 0.01000 kg 16,000.00 160.00
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Tukang kayu 0.05000 Oh 57,500.00 2,875.00
Kepala Tukang 0.00500 Oh 62,500.00 312.50
Mandor 0.00300 Oh 68,000.00 204.00
5,641.50 3,310.00

VII. PEKERJAAN BETON

1 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 5 Kr


Bahan
PC / Portland cement 218.00000 Kg 1,450.00 316,100.00
Pasir pasang / beton 0.52000 M3 120,000.00 62,400.00
Batu pecah 2-3 cm 0.87000 M3 230,000.00 200,100.00

85
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 578,600.00
2 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 6 Kr
Bahan
PC / Portland cement 197.00000 Kg 1,450.00 285,650.00
Pasir pasang / beton 0.47000 M3 120,000.00 56,400.00
Batu pecah 2-3 cm 0.94000 M3 230,000.00 216,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 558,250.00
3 1 m3 Membuat beton tumbuk 1 Pc : 4 Ps : 6 Kr
Bahan
PC / Portland cement 173.00000 Kg 1,450.00 250,850.00
Pasir pasang / beton 0.57000 M3 120,000.00 68,400.00
Batu pecah 2-3 cm 0.87000 M3 230,000.00 200,100.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 519,350.00
4 1 m3 Membuat beton tumbuk 1 Pc : 2 Ps : 3 Kr.
Bahan
PC / Portland cement 232.00000 Kg 1,450.00 336,400.00
Pasir pasang / beton 0.52000 M3 120,000.00 62,400.00
Batu pecah 2-3 cm 0.78000 M3 230,000.00 179,400.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 578,200.00
5 1 m2 Membuat lantai kerja beton tumbuk 1 Pc : 3 Ps : 5 Kr, tebal 5 cm
Bahan
PC / Portland cement 10.00000 Kg 1,450.00 14,500.00
Pasir pasang / beton 0.02600 M3 120,000.00 3,120.00
Batu pecah 2-3 cm 0.04400 M3 230,000.00 10,120.00
Tenaga
Pekerja / Buruh tak terlatih 1.15000 Oh 45,000.00 51,750.00
Tukang batu 0.02000 Oh 57,500.00 1,150.00
Kepala Tukang 0.00200 Oh 62,500.00 125.00
Mandor 0.00600 Oh 68,000.00 408.00

86
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
53,433.00 27,740.00
6 1 m3 Membuat beton dengan mutu K 225
Bahan
PC / Portland cement 388.00000 Kg 1,450.00 562,600.00
Pasir pasang / beton 0.65000 M3 120,000.00 78,000.00
Batu pecah 2-3 cm 0.65000 M3 230,000.00 149,500.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang batu 1.00000 Oh 57,500.00 57,500.00
Kepala Tukang 0.10000 Oh 62,500.00 6,250.00
Mandor 0.30000 Oh 68,000.00 20,400.00
354,150.00 790,100.00
7 1 m3 Membuat beton dengan mutu K 275
Bahan
PC / Portland cement 400.00000 Kg 1,450.00 580,000.00
Pasir pasang / beton 0.40000 M3 120,000.00 48,000.00
Batu pecah 2-3 cm 0.82000 M3 230,000.00 188,600.00

87
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang batu 1.00000 Oh 57,500.00 57,500.00
Kepala Tukang 0.10000 Oh 62,500.00 6,250.00
Mandor 0.30000 Oh 68,000.00 20,400.00
354,150.00 816,600.00
8 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 4 Kr.
Bahan
PC / Portland cement 280.00000 Kg 1,450.00 406,000.00
Pasir pasang / beton 0.45000 M3 120,000.00 54,000.00
Batu pecah 2-3 cm 0.90000 M3 230,000.00 207,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 667,000.00
9 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 2,5 Kr.
Bahan
PC / Portland cement 352.00000 Kg 1,450.00 510,400.00
Pasir pasang / beton 0.56000 M3 120,000.00 67,200.00
Batu pecah 2-3 cm 0.70000 M3 230,000.00 161,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 738,600.00
10 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 3 Kr.
Bahan
PC / Portland cement 357.00000 Kg 1,450.00 517,650.00
Pasir pasang / beton 0.42000 M3 120,000.00 50,400.00
Batu pecah 2-3 cm 0.54000 M3 230,000.00 124,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 692,250.00
11 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 2,5 Kr.
Bahan
PC / Portland cement 386.00000 Kg 1,450.00 559,700.00
Pasir pasang / beton 0.47000 M3 120,000.00 56,400.00
Batu pecah 2-3 cm 0.78000 M3 230,000.00 179,400.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00

88
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
95,627.50 795,500.00
12 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 2 Kr.
Bahan
PC / Portland cement 479.00000 Kg 1,450.00 694,550.00
Pasir pasang / beton 0.37000 M3 120,000.00 44,400.00
Batu pecah 2-3 cm 0.74000 M3 230,000.00 170,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 909,150.00
13 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr.
Bahan
PC / Portland cement 336.00000 Kg 1,450.00 487,200.00
Pasir pasang / beton 0.54000 M3 120,000.00 64,800.00
Batu pecah 2-3 cm 0.81000 M3 230,000.00 186,300.00

89
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 1.00000 Oh 68,000.00 68,000.00
180,312.50 738,300.00
14 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 4 split
Bahan
PC / Portland cement 291.00000 Kg 1,450.00 421,950.00
Pasir pasang / beton 0.47000 M3 120,000.00 56,400.00
Batu pecah 2-3 cm 0.93000 M3 230,000.00 213,900.00
Tenaga
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 1.00000 Oh 68,000.00 68,000.00
180,312.50 692,250.00
15 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 3 split
Bahan
PC / Portland cement 367.00000 Kg 1,450.00 532,150.00
Pasir pasang / beton 0.44000 M3 120,000.00 52,800.00
Batu pecah 2-3 cm 0.88000 M3 230,000.00 202,400.00
Tenaga
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 1.00000 Oh 68,000.00 68,000.00
180,312.50 787,350.00
16 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 2,5 split
Bahan
PC / Portland cement 400.00000 Kg 1,450.00 580,000.00
Pasir pasang / beton 0.48000 M3 120,000.00 57,600.00
Batu pecah 2-3 cm 0.80000 M3 230,000.00 184,000.00
Tenaga
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 1.00000 Oh 68,000.00 68,000.00
180,312.50 821,600.00
17 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 1 Kr.
Bahan
PC / Portland cement 615.00000 Kg 1,450.00 891,750.00
Pasir pasang / beton 0.52000 M3 120,000.00 62,400.00
Batu pecah 2-3 cm 0.52000 M3 230,000.00 119,600.00
Tenaga
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 1.00000 Oh 68,000.00 68,000.00

90
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
180,312.50 1,073,750.00
18 1 Kg Pembesian dengan besi polos atau besi ulir
Bahan
Besi Beton / tulangan beton 1.05000 Kg 11,000.00 11,550.00
Kawat Beton / bendraat 0.01500 Kg 16,400.00 246.00
Tenaga
Pekerja / Buruh tak terlatih 0.00700 Oh 45,000.00 315.00
Tukang besi 0.00700 Oh 57,500.00 402.50
Kepala Tukang 0.00070 Oh 62,500.00 43.75
Mandor 0.00030 Oh 68,000.00 20.40
781.65 11,796.00
19 1 m2 Pasang bekisting untuk pondasi
Bahan
Kayu bekisting 0.04000 M3 2,500,000.00 100,000.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Minyak bekisting 0.10000 Lt 4,500.00 450.00

91
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang kayu 0.26000 Oh 57,500.00 14,950.00
Kepala Tukang 0.02600 Oh 62,500.00 1,625.00
Mandor 0.00500 Oh 68,000.00 340.00
30,415.00 105,250.00
20 1 m2 Pasang bekisting untuk sloof
Bahan
Kayu bekisting 0.04500 M3 2,500,000.00 112,500.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Minyak bekisting 0.10000 Lt 4,500.00 450.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang kayu 0.26000 Oh 57,500.00 14,950.00
Kepala Tukang 0.02600 Oh 62,500.00 1,625.00
Mandor 0.00500 Oh 68,000.00 340.00
30,415.00 117,750.00
21 1 m2 Pasang bekisting untuk kolom
Bahan
Kayu bekisting 0.04000 M3 2,500,000.00 100,000.00
Paku biasa 0.40000 Kg 16,000.00 6,400.00
Minyak bekisting 0.20000 Lt 4,500.00 900.00
Kayu bekisting 0.01500 M3 2,500,000.00 37,500.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 0.35000 Lbr 132,000.00 46,200.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 2.00000 Btg 16,000.00 32,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang kayu 0.33000 Oh 57,500.00 18,975.00
Kepala Tukang 0.03300 Oh 62,500.00 2,062.50
Mandor 0.00600 Oh 68,000.00 408.00
34,945.50 223,000.00
22 1 m2 Pasang bekisting untuk balok
Bahan
Kayu bekisting 0.04000 M3 2,500,000.00 100,000.00
Paku biasa 0.40000 Kg 16,000.00 6,400.00
Minyak bekisting 0.20000 Lt 4,500.00 900.00
Kayu bekisting 0.01800 M3 2,500,000.00 45,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 0.35000 Lbr 132,000.00 46,200.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 2.00000 Btg 16,000.00 32,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang kayu 0.33000 Oh 57,500.00 18,975.00
Kepala Tukang 0.03300 Oh 62,500.00 2,062.50
Mandor 0.00600 Oh 68,000.00 408.00
35,845.50 230,500.00
23 1 m2 Pasang bekisting untuk lantai
Bahan
Kayu bekisting 0.04000 M3 2,500,000.00 100,000.00
Paku biasa 0.40000 Kg 16,000.00 6,400.00

92
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Minyak bekisting 0.20000 Lt 4,500.00 900.00
Kayu bekisting 0.01500 M3 2,500,000.00 37,500.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 0.35000 Lbr 132,000.00 46,200.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 6.00000 Btg 16,000.00 96,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang kayu 0.33000 Oh 57,500.00 18,975.00
Kepala Tukang 0.03300 Oh 62,500.00 2,062.50
Mandor 0.00600 Oh 68,000.00 408.00
35,845.50 287,000.00

93
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
24 1 m2 Pasang bekisting untuk tangga
Bahan
Kayu bekisting 0.03000 M3 2,500,000.00 75,000.00
Paku biasa 0.40000 Kg 16,000.00 6,400.00
Minyak bekisting 0.15000 Lt 4,500.00 675.00
Kayu bekisting 0.01500 M3 2,500,000.00 37,500.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 0.35000 Lbr 132,000.00 46,200.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 2.00000 Btg 16,000.00 32,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang kayu 0.33000 Oh 57,500.00 18,975.00
Kepala Tukang 0.03300 Oh 62,500.00 2,062.50
Mandor 0.00600 Oh 68,000.00 408.00
35,845.50 197,775.00
25 1 m2 Pasang jembatan cor
Bahan
Kayu bekisting 0.02860 M3 2,500,000.00 71,500.00
Paku biasa 0.60000 Kg 16,000.00 9,600.00
Bambu dia 6 - 8 cm, panjang 6 m 0.50000 Btg 10,000.00 5,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.05000 Oh 57,500.00 2,875.00
Kepala Tukang 0.00500 Oh 62,500.00 312.50
Mandor 0.00700 Oh 68,000.00 476.00
10,413.50 86,100.00
26 1 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting).
Bahan
Kayu bekisting 0.20000 M3 2,500,000.00 500,000.00
Paku biasa 1.50000 Kg 16,000.00 24,000.00
Minyak bekisting 0.40000 Lt 4,500.00 1,800.00
Besi Beton / tulangan beton 150.00000 Kg 11,000.00 1,650,000.00
Kawat Beton / bendraat 2.25000 Kg 16,400.00 36,900.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 120,000.00 62,400.00
Batu pecah 2-3 cm 0.78000 M3 230,000.00 179,400.00
Tenaga
Pekerja / Buruh tak terlatih 3.90000 Oh 45,000.00 175,500.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 1.04000 Oh 57,500.00 59,800.00
Tukang besi 1.05000 Oh 57,500.00 60,375.00
Kepala Tukang 0.24500 Oh 62,500.00 15,312.50
Mandor 0.16500 Oh 68,000.00 11,220.00
342,332.50 2,922,850.00
27 1 m3 Membuat sloof beton bertulang (200 kg besi + bekisting).
Bahan
Kayu bekisting 0.27000 M3 2,500,000.00 675,000.00
Paku biasa 2.00000 Kg 16,000.00 32,000.00
Minyak bekisting 0.60000 Lt 4,500.00 2,700.00
Besi Beton / tulangan beton 200.00000 Kg 11,000.00 2,200,000.00

94
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kawat Beton / bendraat 3.00000 Kg 16,400.00 49,200.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 120,000.00 62,400.00
Batu pecah 2-3 cm 0.78000 M3 230,000.00 179,400.00
Tenaga
Pekerja / Buruh tak terlatih 4.85000 Oh 45,000.00 218,250.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 1.56000 Oh 57,500.00 89,700.00
Tukang besi 1.40000 Oh 57,500.00 80,500.00
Kepala Tukang 0.33100 Oh 62,500.00 20,687.50
Mandor 0.17000 Oh 68,000.00 11,560.00
440,822.50 3,669,050.00

95
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
28 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting).
Bahan
Kayu bekisting 0.40000 M3 2,500,000.00 1,000,000.00
Paku biasa 4.00000 Kg 16,000.00 64,000.00
Minyak bekisting 2.00000 Lt 4,500.00 9,000.00
Besi Beton / tulangan beton 300.00000 Kg 11,000.00 3,300,000.00
Kawat Beton / bendraat 4.50000 Kg 16,400.00 73,800.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 120,000.00 62,400.00
Batu pecah 2-3 cm 0.78000 M3 230,000.00 179,400.00
Kayu bekisting 0.15000 M3 2,500,000.00 375,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 3.50000 Lbr 132,000.00 462,000.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 20.00000 Btg 16,000.00 320,000.00
Tenaga
Pekerja / Buruh tak terlatih 7.30000 Oh 45,000.00 328,500.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 3.30000 Oh 57,500.00 189,750.00
Tukang besi 2.10000 Oh 57,500.00 120,750.00
Kepala Tukang 0.57000 Oh 62,500.00 35,625.00
Mandor 0.25000 Oh 68,000.00 17,000.00
711,750.00 6,313,950.00
29 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting).
Bahan
Kayu bekisting 0.32000 M3 2,500,000.00 800,000.00
Paku biasa 3.20000 Kg 16,000.00 51,200.00
Minyak bekisting 1.60000 Lt 4,500.00 7,200.00
Besi Beton / tulangan beton 200.00000 Kg 11,000.00 2,200,000.00
Kawat Beton / bendraat 3.00000 Kg 16,400.00 49,200.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 120,000.00 62,400.00
Batu pecah 2-3 cm 0.78000 M3 230,000.00 179,400.00
Kayu bekisting 0.14000 M3 2,500,000.00 350,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 2.80000 Lbr 132,000.00 369,600.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 16.00000 Btg 16,000.00 256,000.00
Tenaga
Pekerja / Buruh tak terlatih 5.96000 Oh 45,000.00 268,200.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 2.80000 Oh 57,500.00 161,000.00
Tukang besi 1.40000 Oh 57,500.00 80,500.00
Kepala Tukang 0.45500 Oh 62,500.00 28,437.50
Mandor 0.20800 Oh 68,000.00 14,144.00
572,406.50 4,793,350.00
30 1 m3 Membuat balok beton bertulang (150 kg besi + bekisting).
Bahan
Kayu bekisting 0.32000 M3 2,500,000.00 800,000.00
Paku biasa 3.20000 Kg 16,000.00 51,200.00
Minyak bekisting 1.60000 Lt 4,500.00 7,200.00
Besi Beton / tulangan beton 150.00000 Kg 11,000.00 1,650,000.00
Kawat Beton / bendraat 2.25000 Kg 16,400.00 36,900.00

96
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 120,000.00 62,400.00
Batu pecah 2-3 cm 0.78000 M3 230,000.00 179,400.00
Kayu bekisting 0.12000 M3 2,500,000.00 300,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 2.80000 Lbr 132,000.00 369,600.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 32.00000 Btg 16,000.00 512,000.00
Tenaga
Pekerja / Buruh tak terlatih 5.80000 Oh 45,000.00 261,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 2.80000 Oh 57,500.00 161,000.00
Tukang besi 1.05000 Oh 57,500.00 60,375.00
Kepala Tukang 0.42000 Oh 62,500.00 26,250.00
Mandor 0.18500 Oh 68,000.00 12,580.00
541,330.00 4,437,050.00

97
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
31 1 m3 Membuat dinding beton bertulang (150 kg besi + bekisting).
Bahan
Kayu bekisting 0.24000 M3 2,500,000.00 600,000.00
Paku biasa 3.20000 Kg 16,000.00 51,200.00
Minyak bekisting 1.60000 Lt 4,500.00 7,200.00
Besi Beton / tulangan beton 150.00000 Kg 11,000.00 1,650,000.00
Kawat Beton / bendraat 2.25000 Kg 16,400.00 36,900.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 120,000.00 62,400.00
Batu pecah 2-3 cm 0.78000 M3 230,000.00 179,400.00
Kayu bekisting 0.16000 M3 2,500,000.00 400,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 2.80000 Lbr 132,000.00 369,600.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 24.00000 Btg 16,000.00 384,000.00
Tenaga
Pekerja / Buruh tak terlatih 5.60000 Oh 45,000.00 252,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 2.64000 Oh 57,500.00 151,800.00
Tukang besi 1.05000 Oh 57,500.00 60,375.00
Kepala Tukang 0.40000 Oh 62,500.00 25,000.00
Mandor 0.19300 Oh 68,000.00 13,124.00
522,424.00 4,209,050.00
32 1 m3 Membuat tangga beton bertulang (200 kg besi + bekisting).
Bahan
Kayu bekisting 0.25000 M3 2,500,000.00 625,000.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Minyak bekisting 1.20000 Lt 4,500.00 5,400.00
Besi Beton / tulangan beton 200.00000 Kg 11,000.00 2,200,000.00
Kawat Beton / bendraat 3.00000 Kg 16,400.00 49,200.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 120,000.00 62,400.00
Batu pecah 2-3 cm 0.78000 M3 230,000.00 179,400.00
Kayu bekisting 0.10500 M3 2,500,000.00 262,500.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 2.50000 Lbr 132,000.00 330,000.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 14.00000 Btg 16,000.00 224,000.00
Tenaga
Pekerja / Buruh tak terlatih 5.60000 Oh 45,000.00 252,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 2.30000 Oh 57,500.00 132,250.00
Tukang besi 1.40000 Oh 57,500.00 80,500.00
Kepala Tukang 0.40500 Oh 62,500.00 25,312.50
Mandor 0.20200 Oh 68,000.00 13,736.00
523,923.50 4,454,250.00
33 1 m’ Membuat kolom penguat beton bertulang (11 x 11) cm.
Bahan
Kayu bekisting 0.00200 M3 2,500,000.00 5,000.00
Paku biasa 0.01000 Kg 16,000.00 160.00
Besi Beton / tulangan beton 3.00000 Kg 11,000.00 33,000.00
Kawat Beton / bendraat 0.45000 Kg 16,400.00 7,380.00
PC / Portland cement 4.00000 Kg 1,450.00 5,800.00

98
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pasir pasang / beton 0.00600 M3 120,000.00 720.00
Batu pecah 2-3 cm 0.00900 M3 230,000.00 2,070.00
Tenaga
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Tukang batu 0.02000 Oh 57,500.00 1,150.00
Tukang kayu 0.02000 Oh 57,500.00 1,150.00
Tukang besi 0.02000 Oh 57,500.00 1,150.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00300 Oh 68,000.00 204.00
6,729.00 54,130.00
34 1 m’ Membuat ring balok beton bertulang (10 x 15) cm.
Bahan
Kayu bekisting 0.00300 M3 2,500,000.00 7,500.00
Paku biasa 0.02000 Kg 16,000.00 320.00
Besi Beton / tulangan beton 3.60000 Kg 11,000.00 39,600.00
Kawat Beton / bendraat 0.05000 Kg 16,400.00 820.00
PC / Portland cement 5.50000 Kg 1,450.00 7,975.00
Pasir pasang / beton 0.00900 M3 120,000.00 1,080.00
Batu pecah 2-3 cm 0.01500 M3 230,000.00 3,450.00

99
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang batu 0.03300 Oh 57,500.00 1,897.50
Tukang kayu 0.03300 Oh 57,500.00 1,897.50
Tukang besi 0.03300 Oh 57,500.00 1,897.50
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,157.50 60,745.00
35 1 m2 Membuat Bekisting
Tenaga :
Tukang kayu 0.26000 Oh 57,500.00 14,950.00
Kepala Tukang 0.02600 Oh 62,500.00 1,625.00
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Mandor 0.00500 Oh 68,000.00 340.00
Bahan :
Kayu bekisting 0.04500 M3 2,500,000.00 112,500.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
30,415.00 117,300.00
36 1 m3 Membongkar bekisting dan perawatan beton
Tenaga :
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
180,000.00

VIII. PEKERJAAN PENUTUP ATAP

1 1 m2 Pasang atap genteng press biasa


Bahan
Genteng pres biasa 25.00000 Buah 1,300.00 32,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00800 Oh 62,500.00 500.00
Mandor 0.00800 Oh 68,000.00 544.00
12,106.50 32,500.00
2 1 m2 Pasang atap genteng MKP lokal
Bahan
Genteng MKP 25.00000 Bh 1,500.00 37,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00800 Oh 62,500.00 500.00
Mandor 0.00800 Oh 68,000.00 544.00
12,106.50 37,500.00
3 1 m2 Pasang atap genteng Mantili
Bahan
Genteng mantili 22.00000 Bh 1,600.00 35,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07500 Oh 57,500.00 4,312.50

100
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.00800 Oh 62,500.00 500.00
Mandor 0.00800 Oh 68,000.00 544.00
12,106.50 35,200.00
4 1 m’ Pasang bubung genteng MKP Lokal
Bahan
Genteng Bubung MKP 5.00000 Buah 4,200.00 21,000.00
PC / Portland cement 8.00000 Kg 1,450.00 11,600.00
Pasir pasang / beton 0.03200 M3 120,000.00 3,840.00
Tenaga
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00200 Oh 68,000.00 136.00
30,886.00 36,440.00

101
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
5 1 m2 Pasang atap asbes gelombang besar (3,00 x 1,05 m) x 4 mm
Bahan
Asbes Gelombang Besar Uk. 300 x 105 x0,4 Cm 0.35000 Lbr 66,000.00 23,100.00
Paku Asbes 0.12000 Kg 36,000.00 4,320.00
Tenaga
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00700 Oh 68,000.00 476.00
11,238.50 27,420.00
6 1 m2 Pasang atap asbes gelombang kecil (1,80 x 1,05 m) x 4 mm
Bahan
Asbes Gelombang Kecil Uk. 1.80 x 105 x0,4 Cm 0.51000 Lbr 40,800.00 20,808.00
Paku Asbes 0.12000 Kg 36,000.00 4,320.00
Tenaga
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Tukang batu 0.06700 Oh 57,500.00 3,852.50
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00700 Oh 68,000.00 476.00
11,066.00 25,128.00
7 1 m’ Pasang bubung stel gelombang besar
Bahan
Bubung asbes gel besar ( Ardek 1Stel 2 Lmbr ) 0.55000 Lbr 46,200.00 25,410.00
Paku Asbes 0.12000 Bh 36,000.00 4,320.00
Tenaga
Pekerja / Buruh tak terlatih 0.08400 Oh 45,000.00 3,780.00
Tukang batu 0.12500 Oh 57,500.00 7,187.50
Kepala Tukang 0.01300 Oh 62,500.00 812.50
Mandor 0.00400 Oh 68,000.00 272.00
12,052.00 29,730.00
8 1 m’ Pasang bubung stel gelombang kecil
Bahan
Bubung asbes gel kecil ( Ardek 1Stel 2 Lmbr ) 0.55000 Lbr 29,000.00 15,950.00
Paku Asbes 0.12000 Buah 36,000.00 4,320.00
Tenaga
Pekerja / Buruh tak terlatih 0.08400 Oh 45,000.00 3,780.00
Tukang batu 0.12500 Oh 57,500.00 7,187.50
Kepala Tukang 0.01300 Oh 62,500.00 812.50
Mandor 0.00400 Oh 68,000.00 272.00
12,052.00 20,270.00
9 1 m2 Pasang atap genteng beton
Bahan
Genteng Beton 11.00000 Bh 3,700.00 40,700.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01000 Oh 68,000.00 680.00

102
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
16,055.00 41,180.00
10 1 m2 Pasang atap genteng metal
Bahan
Genteng Metal 1.02000 Lbr 115,000.00 117,300.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00100 Oh 68,000.00 68.00
15,443.00 120,500.00
11 1 m2 Pasang atap sirap
Bahan
Atap Sirap ( Kayu Ulin ) 60.00000 Bh 1,916.67 115,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.16600 Oh 45,000.00 7,470.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00800 Oh 68,000.00 544.00
23,951.50 118,200.00

103
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
12 1 m’ Pasang nok genteng beton
Bahan
Genteng bubung beton 3.50000 Buah 6,600.00 23,100.00
Paku biasa 0.05000 Kg 16,000.00 800.00
PC / Portland cement 10.80000 Kg 1,450.00 15,660.00
Pasir pasang / beton 0.03200 M3 120,000.00 3,840.00
Semen Putih / warna 1.00000 Kg 2,000.00 2,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.02000 Oh 68,000.00 1,360.00
32,110.00 45,400.00
13 1 m’ Pasang nok sirap
Bahan
Seng Plat BJLS 30 lebar 0,90 m 0.40000 Lbr 41,000.00 16,400.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Kayu Meranti Papan 0.00400 M3 5,900,000.00 23,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.12500 Oh 45,000.00 5,625.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00600 Oh 68,000.00 408.00
21,970.50 41,760.00
14 1 m2 Pasang atap seng gelombang
Bahan
Seng Gelombang Bjls 30 uk 180 x 90 x 0,03Cm 0.70000 Lbr 66,000.00 46,200.00
Paku Seng ( Paku payung ) 0.02000 Kg 30,000.00 600.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00600 Oh 68,000.00 408.00
9,633.00 46,800.00
15 1 m2 Pasang atap nok seng
Bahan
Seng Plat BJLS 30 lebar 0,90 m 0.30000 Lbr 41,000.00 12,300.00
Paku Seng ( Paku payung ) 0.04000 Kg 30,000.00 1,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00800 Oh 68,000.00 544.00
11,756.50 13,500.00
16 1 m2 Pasang aluminium foil / sisalation
Bahan
Alumunium foil 1.05000 M2 9,900.00 10,395.00
Tenaga

104
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.05000 Oh 57,500.00 2,875.00
Kepala Tukang 0.00500 Oh 62,500.00 312.50
Mandor 0.00800 Oh 68,000.00 544.00
10,481.50 10,395.00
IX. PEKERJAAN LANGIT - LANGIT

1 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 4 mm


Bahan
Eternit polos (Asbes) 1.10000 Lbr 9,600.00 10,560.00
Paku biasa 0.01000 Kg 16,000.00 160.00
Tenaga
Pekerja / Buruh tak terlatih 0.03000 Oh 45,000.00 1,350.00
Tukang kayu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00150 Oh 68,000.00 102.00
5,914.50 10,720.00
2 1 m2 Langit-langit plywood (30 x 60) cm, tebal 4 mm
Bahan
Playwood ( 120 x 240 ) cm, tbl. 4 mm 0.36000 Lbr 62,400.00 22,464.00
Paku biasa 0.03000 Kg 16,000.00 480.00

105
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.07000 Oh 45,000.00 3,150.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00350 Oh 68,000.00 238.00
9,763.00 22,944.00
3 1 m2 Langit-langit teakwood (30 x 60) cm, tebal 4 mm
Bahan
Teakwood ( 122 X 242 ) Cm 0.36000 Lbr 99,000.00 35,640.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Tenaga
Pekerja / Buruh tak terlatih 0.07000 Oh 45,000.00 3,150.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00350 Oh 68,000.00 238.00
9,763.00 36,120.00
4 1 m2 Langit-langit gypsum board, tebal 9 mm
Bahan
Gypsum board ( 1,2 x 2,4 m ) 0.36400 Lbr 69,000.00 25,116.00
Paku Gypsum 0.11000 Kg 22,000.00 2,420.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.05000 Oh 57,500.00 2,875.00
Kepala Tukang 0.00500 Oh 62,500.00 312.50
Mandor 0.00500 Oh 68,000.00 340.00
8,027.50 27,536.00
5 1 m' List Plafond Gypsum Kecil
Tenaga :
Tukang kayu 0.02100 Oh 57,500.00 1,207.50
Kepala Tukang 0.00200 Oh 62,500.00 125.00
Pekerja / Buruh tak terlatih 0.02100 Oh 45,000.00 945.00
Mandor 0.00100 Oh 68,000.00 68.00
Bahan :
List Profil kecil ( gypsum ) 1.05000 M' 16,500.00 17,325.00
Plamur Tembok 0.20000 Kg 9,300.00 1,860.00
2,345.50 19,185.00
6 1 m' List Plafond Gypsum Besar
Tenaga :
Tukang kayu 0.02100 Kg 57,500.00 1,207.50
Kepala Tukang 0.00200 Oh 62,500.00 125.00
Pekerja / Buruh tak terlatih 0.02100 Oh 45,000.00 945.00
Mandor 0.00100 Oh 68,000.00 68.00
Bahan :
List Profil besar ( gypsum ) 1.05000 M' 26,500.00 27,825.00
Plamur Tembok 0.20000 Kg 9,300.00 1,860.00
2,345.50 29,685.00

X. PEKERJAAN SANITASI

106
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
1 1 bh Memasang kloset duduk/monoblok
Bahan
Kloset Monoblok Lokal 1.00000 Bh 960,000.00 960,000.00
Perlengkapan 0.06000 Hrg. bh 960,000.00 57,600.00
Tenaga
Pekerja / Buruh tak terlatih 3.30000 Oh 45,000.00 148,500.00
Tukang batu 1.10000 Oh 57,500.00 63,250.00
Kepala Tukang 0.00100 Oh 62,500.00 62.50
Mandor 0.16000 Oh 68,000.00 10,880.00
222,692.50 1,017,600.00
2 1 bh Memasang kloset duduk keramik
Bahan :
Kloset Duduk Keramik 1.00000 Bh 330,000.00 330,000.00
Perlengkapan 0.06000 Hrg. bh 330,000.00 19,800.00
Tenaga :
Pekerja / Buruh tak terlatih 3.30000 Oh 45,000.00 148,500.00
Tukang batu 1.10000 Oh 57,500.00 63,250.00
Kepala Tukang 0.00100 Oh 62,500.00 62.50
Mandor 0.16000 Oh 68,000.00 10,880.00
222,692.50 349,800.00

107
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
3 1 bh Memasang kloset jongkok porselen
Bahan
Kloset Jongkok Keramik 1.00000 Bh 102,000.00 102,000.00
PC / Portland cement 6.00000 Kg 1,450.00 8,700.00
Pasir pasang / beton 0.01000 M3 120,000.00 1,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang batu 1.50000 Oh 57,500.00 86,250.00
Kepala Tukang 1.50000 Oh 62,500.00 93,750.00
Mandor 0.16000 Oh 68,000.00 10,880.00
235,880.00 111,900.00
4 1 bh Memasang kloset jongkok teraso
Bahan
Kloset Jongkok teraso 1.00000 Bh 72,600.00 72,600.00
Batu Bata / Merah 7.00000 Bh 600.00 4,200.00
PC / Portland cement 6.00000 Kg 1,450.00 8,700.00
Pasir pasang / beton 0.01000 M3 120,000.00 1,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang batu 1.50000 Oh 57,500.00 86,250.00
Kepala Tukang 0.30000 OH 62,500.00 18,750.00
Mandor 0.11000 Oh 68,000.00 7,480.00
157,480.00 86,700.00
5 1 bh Memasang urinoir
Bahan
Urinoir 1.00000 Bh 275,000.00 275,000.00
Perlengkapan 0.30000 Hrg.bh 275,000.00 82,500.00
PC / Portland cement 6.00000 Kg 1,450.00 8,700.00
Pasir pasang / beton 0.01000 M3 120,000.00 1,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang batu 1.00000 Oh 57,500.00 57,500.00
Kepala Tukang 0.10000 Oh 62,500.00 6,250.00
Mandor 0.10000 Oh 68,000.00 6,800.00
115,550.00 367,400.00
6 1 bh Memasang wastafel
Bahan
Bak Cuci Tangan Wastafel 1.00000 Bh 225,000.00 225,000.00
Perlengkapan 0.12000 Hrg.bh 225,000.00 27,000.00
PC / Portland cement 6.00000 Kg 1,450.00 8,700.00
Pasir pasang / beton 0.01000 M3 120,000.00 1,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.20000 Oh 45,000.00 54,000.00
Tukang batu 1.45000 Oh 57,500.00 83,375.00
Kepala Tukang 0.15000 Oh 62,500.00 9,375.00
Mandor 0.10000 Oh 68,000.00 6,800.00
153,550.00 261,900.00
7 1 bh Memasang bak mandi teraso volume 0,30 m3
Bahan

108
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bak mandi teraso volume 0.3 m3 1.00000 Bh 165,000.00 165,000.00
PC / Portland cement 6.00000 Kg 1,450.00 8,700.00
Pasir pasang / beton 0.01000 M3 120,000.00 1,200.00
Tenaga
Pekerja / Buruh tak terlatih 2.10000 Oh 45,000.00 94,500.00
Tukang batu 0.75000 Oh 57,500.00 43,125.00
Kepala Tukang 0.07000 Oh 62,500.00 4,375.00
Mandor 0.11000 Oh 68,000.00 7,480.00
149,480.00 174,900.00
8 1 bh Memasang bak mandi Fibreglass volume 0,30 m3
Bahan
Bak Mandi Fiber glass, 0.3 m3 1.00000 1 Bh 65,000.00 65,000.00
Perlengkapan 0.18000 Hrg.bh 65,000.00 11,700.00
Tenaga
Pekerja / Buruh tak terlatih 1.80000 Oh 45,000.00 81,000.00
Tukang batu 2.70000 Oh 57,500.00 155,250.00
Kepala Tukang 0.54000 Oh 62,500.00 33,750.00
Mandor 0.11000 Oh 68,000.00 7,480.00
277,480.00 76,700.00

109
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
9 1 bh Memasang badkip porselen
Bahan
Bak Kip 1.00000 Bh 1,275,000.00 1,275,000.00
Perlengkapan 0.20000 Hr, bh 1,275,000.00 255,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.00750 Oh 45,000.00 337.50
Tukang batu 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00750 Oh 62,500.00 468.75
Mandor 0.00380 Oh 68,000.00 258.40
5,377.15 1,530,000.00
10 1 bh Memasang bak fibreglass volume 1 m3 air
Bahan
Bak Mandi Fiber glass, 1.00 m x 1.00 m 1.00000 Bh 210,000.00 210,000.00
harga
Perlengkapan 0.12000 210,000.00 25,200.00
bak
Tenaga
Pekerja / Buruh tak terlatih 3.00000 Oh 45,000.00 135,000.00
Tukang batu 4.50000 Oh 57,500.00 258,750.00
Kepala Tukang 0.90000 Oh 62,500.00 56,250.00
Mandor 0.90000 Oh 68,000.00 61,200.00
511,200.00 235,200.00
11 1 m' Memasang pipa beton, diameter 15 cm - 20cm
Bahan
Buis Beton ø 20 Cm 1.10000 Bh 25,500.00 28,050.00
Batu Bata / Merah 45.00000 bh 600.00 27,000.00
PC / Portland cement 3.92000 Kg 1,450.00 5,684.00
Pasir pasang / beton 0.05600 M3 120,000.00 6,720.00
Pasir Urug 0.02400 M3 54,600.00 1,310.40
Tenaga
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00700 Oh 68,000.00 476.00
11,238.50 68,764.40
12 1 m' Memasang pipa beton, diameter 30 cm
Bahan
Buis Beton ø 30 Cm 1.10000 Bh 40,000.00 44,000.00
Batu Bata / Merah 45.00000 bh 600.00 27,000.00
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 120,000.00 7,320.00
Pasir Urug 0.06900 M3 54,600.00 3,767.40
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 97,022.40
13 1 m' Memasang pipa beton, diameter 40 cm
Bahan
Buis Beton ø 40 Cm 1.10000 Bh 47,500.00 52,250.00

110
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Batu Bata / Merah 45.00000 bh 600.00 27,000.00
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 120,000.00 7,320.00
Pasir Urug 0.06900 M3 54,600.00 3,767.40
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 105,272.40
14 1 m' Memasang pipa beton, diameter 50 cm
Bahan
Buis Beton ø 50 Cm 1.10000 Bh 75,000.00 82,500.00
Batu Bata / Merah 45.00000 bh 600.00 27,000.00
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 120,000.00 7,320.00
Pasir Urug 0.06900 M3 54,600.00 3,767.40

111
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 135,522.40
15 1 m' Memasang pipa beton, diameter 60 cm
Bahan
Buis Beton ø 60 Cm 1.10000 Bh 80,000.00 88,000.00
Batu Bata / Merah 45.00000 bh 600.00 27,000.00
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 120,000.00 7,320.00
Pasir Urug 0.06900 M3 54,600.00 3,767.40
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 141,022.40
16 1 m' Memasang pipa beton, diameter 80 cm
Bahan
Buis Beton ø 80 Cm 1.10000 Bh 110,000.00 121,000.00
Batu Bata / Merah 45.00000 bh 600.00 27,000.00
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 120,000.00 7,320.00
Pasir Urug 0.06900 M3 54,600.00 3,767.40
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 174,022.40
17 1 m' Memasang pipa beton, diameter 100 cm
Bahan
Buis Beton ø 100 Cm 1.10000 Bh 192,000.00 211,200.00
Batu Bata / Merah 45.00000 bh 600.00 27,000.00
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 120,000.00 7,320.00
Pasir Urug 0.06900 M3 54,600.00 3,767.40
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 264,222.40
18 1 bh Memasang bak kontrol pasangan batu bata ukuran (30 x30) cm, tinggi 35 cm
Bahan
Batu Bata / Merah 50.00000 bh 600.00 30,000.00
PC / Portland cement 44.00000 Kg 1,450.00 63,800.00

112
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pasir pasang / beton 0.07000 M3 120,000.00 8,400.00
Batu pecah 2-3 cm 0.07000 M3 230,000.00 16,100.00
Besi Beton / tulangan beton 1.60000 Kg 11,000.00 17,600.00
Pasir pasang / beton 0.06000 M3 120,000.00 7,200.00
Tenaga
Pekerja / Buruh tak terlatih 3.20000 Oh 45,000.00 144,000.00
Tukang batu 1.01500 Oh 57,500.00 58,362.50
Kepala Tukang 0.00150 Oh 62,500.00 93.75
Mandor 0.01600 Oh 68,000.00 1,088.00
203,544.25 143,100.00
19 1 bh Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
Bahan
Batu Bata / Merah 85.00000 bh 600.00 51,000.00
PC / Portland cement 77.00000 Kg 1,450.00 111,650.00
Pasir pasang / beton 0.13000 M3 120,000.00 15,600.00
Batu pecah 2-3 cm 0.02000 M3 230,000.00 4,600.00
Besi Beton / tulangan beton 2.60000 Kg 11,000.00 28,600.00
Pasir pasang / beton 0.09000 M3 120,000.00 10,800.00

113
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 1.42000 Oh 45,000.00 63,900.00
Tukang batu 0.47300 Oh 57,500.00 27,197.50
Kepala Tukang 0.04700 Oh 62,500.00 2,937.50
Mandor 0.07100 Oh 68,000.00 4,828.00
98,863.00 222,250.00
20 1 bh Memasang bak kontrol pasangan batu bata ukuran (60x60) cm, tinggi 65 cm
Bahan
Batu Bata / Merah 100.00000 bh 600.00 60,000.00
PC / Portland cement 114.00000 Kg 1,450.00 165,300.00
Pasir pasang / beton 0.18400 M3 120,000.00 22,080.00
Batu pecah 2-3 cm 0.03300 M 3
230,000.00 7,590.00
Besi Beton / tulangan beton 4.85000 Kg 11,000.00 53,350.00
Pasir pasang / beton 0.12000 M3 120,000.00 14,400.00
Tenaga
Pekerja / Buruh tak terlatih 2.16000 Oh 45,000.00 97,200.00
Tukang batu 0.72000 Oh 57,500.00 41,400.00
Kepala Tukang 0.07200 Oh 62,500.00 4,500.00
Mandor 0.10800 Oh 68,000.00 7,344.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
156,194.00 322,720.00
21 1 m' Memasang buis beton 1/2 lingkaran dia 20 cm
Tenaga :
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Mandor 0.00700 Oh 68,000.00 476.00
Bahan :
Buis Beton 1/2 ø 20 Cm 1.10000 M! 17,500.00 19,250.00
Batu Bata / Merah 7.00000 Bj 600.00 4,200.00
PC / Portland cement 1.96000 Kg 1,450.00 2,842.00
Pasir pasang / beton 0.02800 M3 120,000.00 3,360.00
Pasir Urug 0.01200 M3 54,600.00 655.20
Upah diambil 50 % 5,619.25 30,307.20
22 1 m' Memasang buis beton 1/2 lingkaran dia 30 cm
Tenaga :
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Mandor 0.00700 Oh 68,000.00 476.00
Bahan :
Buis Beton 1/2 ø 30 Cm 1.10000 M! 28,000.00 30,800.00
Batu Bata / Merah 7.00000 Bj 600.00 4,200.00
PC / Portland cement 1.96000 Kg 1,450.00 2,842.00
Pasir pasang / beton 0.02800 M3 120,000.00 3,360.00
Pasir Urug 0.01200 M3 54,600.00 655.20
Upah diambil 50 % 5,619.25 41,857.20
23 1 m' Memasang buis beton 1/2 lingkaran dia 40 cm
Tenaga :

114
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Mandor 0.00700 Oh 68,000.00 476.00
Bahan :
Buis Beton 1/2 ø 40 Cm 1.10000 M! 30,000.00 33,000.00
Batu Bata / Merah 7.00000 Bj 600.00 4,200.00
PC / Portland cement 1.96000 Kg 1,450.00 2,842.00
Pasir pasang / beton 0.02800 M3 120,000.00 3,360.00
Pasir Urug 0.01200 M3 54,600.00 655.20
Upah diambil 50 % 5,619.25 44,057.20
24 1 m' Memasang pipa galvanis diameter 1” tebal 0,8 mm
Bahan
Pipa Galvanis Ø 1" Tebal 0.8 mm 1.20000 M` 12,000.00 14,400.00
harga
Perlengkapan 0.35000 12,000.00 4,200.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 18,600.00

115
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
25 1 m' Memasang pipa galvanis diameter 1,5” tebal 0,8 mm
Bahan
Pipa Galvanis Ø1.5" Tebal 0.8 mm 1.20000 M` 15,000.00 18,000.00
harga
Perlengkapan 0.35000 15,000.00 5,250.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 23,250.00
26 1 m' Memasang pipa galvanis diameter 2” tebal 0,8 mm
Bahan
Pipa Galvanis Ø2" Tebal 0.8 mm 1.20000 1,2 M` 19,500.00 23,400.00
harga
Perlengkapan 0.35000 19,500.00 6,825.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 30,225.00
27 1 m' Memasang pipa galvanis diameter 2,5” tebal 0,8 mm
Bahan
Pipa Galvanis Ø2.5" Tebal 0.8 mm 1.20000 1,2 M` 28,500.00 34,200.00
harga
Perlengkapan 0.35000 28,500.00 9,975.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00
Mandor 0.00540 Oh 68,000.00 367.20
16,702.20 44,175.00
28 1 m' Memasang pipa galvanis diameter 3” tebal 0,8 mm
Bahan
Pipa Galvanis Ø3" Tebal 0.8 mm 1.20000 1,2 M` 50,000.00 60,000.00
harga
Perlengkapan 0.35000 50,000.00 17,500.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00
Mandor 0.00540 Oh 68,000.00 367.20
16,702.20 77,500.00
29 1 m' Memasang pipa galvanis diameter 4” tebal 0,8 mm
Bahan
Pipa Galvanis Ø4" Tebal 0.8 mm 1.20000 1,2 M` 60,000.00 72,000.00
harga
Perlengkapan 0.35000 60,000.00 21,000.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00
Mandor 0.00540 Oh 68,000.00 367.20

116
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
16,702.20 93,000.00
30 1 m' Memasang pipa GIP BSA diameter ½”
Bahan
GIP BSA diameter 1/2" 1.20000 M` 4,000.00 4,800.00
harga
Perlengkapan 0.35000 4,000.00 1,400.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 6,200.00
31 1 m' Memasang pipa GIP BSA diameter ¾”
Bahan
GIP BSA diameter 3/4" 1.20000 M` 6,000.00 7,200.00
harga
Perlengkapan 0.35000 6,000.00 2,100.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 9,300.00
32 1 m' Memasang pipa GIP BSA diameter 1”
Bahan
GIP BSA diameter 1" 1.20000 1,2 M` 8,000.00 9,600.00
harga
Perlengkapan 0.35000 8,000.00 2,800.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 12,400.00
33 1 m' Memasang pipa GIP BSA diameter 1½”
Bahan
GIP BSA diameter 1,5" 1.20000 1,2 M` 10,500.00 12,600.00
harga
Perlengkapan 0.35000 10,500.00 3,675.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00
Mandor 0.00540 Oh 68,000.00 367.20
16,702.20 16,275.00
34 1 m' Memasang pipa GIP BSA diameter 2”
Bahan
GIP BSA diameter 2" 1.20000 1,2 M` 12,500.00 15,000.00
harga
Perlengkapan 0.35000 12,500.00 4,375.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00

117
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00540 Oh 68,000.00 367.20
16,702.20 19,375.00
35 1 m' Memasang pipa GIP BSA diameter 3”
Bahan
GIP BSA diameter 3" 1.20000 1,2 M` 17,500.00 21,000.00
harga
Perlengkapan 0.35000 17,500.00 6,125.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00
Mandor 0.00540 Oh 68,000.00 367.20
16,702.20 27,125.00
36 1 m' Memasang pipa GIP BSA diameter 4”
Bahan
GIP BSA diameter 4" 1.20000 M` 21,000.00 25,200.00
harga
Perlengkapan 0.35000 21,000.00 7,350.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.13500 Oh 45,000.00 6,075.00
Tukang batu 0.22500 Oh 57,500.00 12,937.50
Kepala Tukang 0.02250 Oh 62,500.00 1,406.25
Mandor 0.00680 Oh 68,000.00 462.40
20,881.15 32,550.00
37 1 m' Memasang pipa PVC tipe AW diameter ½”
Bahan
PVC AW Dia 1/2 " 1.20000 M` 5,100.00 6,120.00
harga
Perlengkapan 0.35000 5,100.00 1,785.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.03600 Oh 45,000.00 1,620.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00180 Oh 68,000.00 122.40
5,567.40 7,905.00
38 1 m' Memasang pipa PVC tipe AW diameter ¾”
Bahan
PVC AW Dia 3/4 " 1.20000 M` 6,300.00 7,560.00
harga
Perlengkapan 0.35000 6,300.00 2,205.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.03600 Oh 45,000.00 1,620.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00180 Oh 68,000.00 122.40
5,567.40 9,765.00
39 1 m' Memasang pipa PVC tipe AW diameter 1”
Bahan
PVC AW Dia 1 " 1.20000 M` 7,250.00 8,700.00
harga
Perlengkapan 0.35000 7,250.00 2,537.50
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.03600 Oh 45,000.00 1,620.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00

118
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00180 Oh 68,000.00 122.40
5,567.40 11,237.50
40 1 m' Memasang pipa PVC tipe AW diameter 5”
Bahan
PVC AW Dia 5 " 1.20000 M` 90,600.00 108,720.00
harga
Perlengkapan 0.35000 90,600.00 31,710.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.03600 Oh 45,000.00 1,620.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00180 Oh 68,000.00 122.40
5,567.40 140,430.00
41 1 m' Memasang pipa PVC tipe AW diameter 2”
Bahan
PVC AW Dia 2 " 1.20000 M` 17,500.00 21,000.00
harga
Perlengkapan 0.35000 17,500.00 6,125.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.00270 Oh 68,000.00 183.60
8,351.10 27,125.00
42 1 m' Memasang pipa PVC tipe AW diameter 2½ ”
Bahan
PVC. AW Dia 2.5" 1.20000 M` 28,000.00 33,600.00
harga
Perlengkapan 0.35000 28,000.00 9,800.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.03600 Oh 45,000.00 1,620.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00180 Oh 68,000.00 122.40
5,567.40 43,400.00
43 1 m' Memasang pipa PVC tipe AW diameter 3 ”
Bahan
PVC AW Dia 3 " 1.20000 M` 36,000.00 43,200.00
harga
Perlengkapan 0.35000 36,000.00 12,600.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.08100 Oh 45,000.00 3,645.00
Tukang batu 0.13500 Oh 57,500.00 7,762.50
Kepala Tukang 0.01350 Oh 62,500.00 843.75
Mandor 0.00410 Oh 68,000.00 278.80
12,530.05 55,800.00
44 1 m' Memasang pipa PVC tipe AW diameter 4 ”
Bahan
PVC AW Dia 4 " 1.20000 M` 52,500.00 63,000.00
harga
Perlengkapan 0.35000 52,500.00 18,375.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.08100 Oh 45,000.00 3,645.00

119
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tukang batu 0.13500 Oh 57,500.00 7,762.50
Kepala Tukang 0.01350 Oh 62,500.00 843.75
Mandor 0.00410 Oh 68,000.00 278.80
12,530.05 81,375.00
45 1 bh Memasang kran Dupon diameter ½”
Bahan
Kran Dupon 1.00000 Bh 158,000.00 158,000.00
Seal Tape 0.02500 Bh 23,100.00 577.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 158,577.50
46 1 bh Memasang kran Toto diameter ½”
Bahan
Kran Toto 1/2" 1.00000 Bh 241,000.00 241,000.00
Seal Tape 0.02500 Bh 23,100.00 577.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 241,577.50
47 1 bh Memasang kran diameter ½”
Bahan
Kran Dia 1/2 " 1.00000 Bh 14,400.00 14,400.00
Seal Tape 0.02500 Bh 23,100.00 577.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 14,977.50
48 1 bh Memasang kran diameter ¾”
Bahan
Kran Dia 3/4 " 1.00000 Bh 19,800.00 19,800.00
Seal Tape 0.02500 Bh 23,100.00 577.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 20,377.50
49 1 bh Memasang stop kran diameter ½”
Bahan
Stop Kran Dia 1/2 " 1.00000 Bh 28,400.00 28,400.00
Seal Tape 0.02500 Bh 23,100.00 577.50
Tenaga

120
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 28,977.50
50 1 bh Memasang stop kran diameter ¾”
Bahan
Stop Kran Dia 3/4 " 1.00000 Bh 32,700.00 32,700.00
Seal Tape 0.02500 Bh 23,100.00 577.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 33,277.50
51 1 bh Memasang stop kran diameter 1”
Bahan
Stop Kran Dia 1 " 1.00000 Bh 38,200.00 38,200.00
Seal Tape 0.02500 Bh 23,100.00 577.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 38,777.50
52 1 bh Memasang Floor drain stainless steel
Bahan
Avor staninlees steel 1.00000 Bh 15,000.00 15,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 15,000.00

121
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
53 1 bh Memasang Floor drain plastik
Bahan
Avor plastik / floor drain 1.00000 Bh 9,000.00 9,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 9,000.00
XI. PEKERJAAN BESI DAN ALUMINIUM

1 1 Kg Pabrikasi dan pasang Rangka baja


Tenaga :
Tukang besi 0.00600 Oh 57,500.00 345.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Mandor 0.00030 Oh 68,000.00 20.40
Bahan :
Baja Profil 1.10000 Kg 13,000.00 14,300.00
Elektroda dan alat bantu dll 20% x harga bahan 0.20000 % 13,000.00 2,600.00
3,440.40 16,900.00
2 1 Kg Pasang rangka atap baja
Bahan
Baja Profil 1.10000 Kg 13,000.00 14,300.00
Cat Meny besi 0.08000 kg 15,000.00 1,200.00
Tenaga
Tukang besi 0.00600 Oh 57,500.00 345.00
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00030 Oh 68,000.00 20.40
3,440.40 15,500.00
3 1 m2 Pasang pintu besi baja
Bahan
Pintu besi baja 1.00000 M2 990,000.00 990,000.00
Tenaga
Tukang besi 0.65000 Oh 57,500.00 37,375.00
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Kepala Tukang 0.06500 Oh 62,500.00 4,062.50
Mandor 0.32000 Oh 68,000.00 21,760.00
92,447.50 990,000.00
4 1 m2 Pasang pintu lipat
Bahan
Pintu besi baja 1.00000 M2 990,000.00 990,000.00
Tenaga
Tukang besi 1.05000 Oh 57,500.00 60,375.00
Pekerja / Buruh tak terlatih 1.05000 Oh 45,000.00 47,250.00
Kepala Tukang 0.10500 Oh 62,500.00 6,562.50
Mandor 0.00520 Oh 68,000.00 353.60
114,541.10 990,000.00

122
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
5 1 m2 Pasang Rolling door
Bahan
Roling Door aluminium 1.00000 M2 400,000.00 400,000.00
Tenaga
Tukang besi 1.50000 Oh 57,500.00 86,250.00
Pekerja / Buruh tak terlatih 1.05000 Oh 45,000.00 47,250.00
Kepala Tukang 0.10500 Oh 62,500.00 6,562.50
Mandor 0.00520 Oh 68,000.00 353.60
140,416.10 400,000.00
6 1 m2 Pasang pintu alluminium
Bahan
Pintu aluminium coklat / hitam 4" 1.00000 M2 660,000.00 660,000.00
Tenaga
Tukang besi 1.05000 Oh 57,500.00 60,375.00
Pekerja / Buruh tak terlatih 1.05000 Oh 45,000.00 47,250.00
Kepala Tukang 0.10500 Oh 62,500.00 6,562.50
Mandor 0.00520 Oh 68,000.00 353.60
114,541.10 660,000.00

123
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
7 1 m2 Pasang kawat harmonika
Bahan
Kawat Harmonika 1.10000 M2 30,000.00 33,000.00
Paku biasa 0.02000 Kg 16,000.00 320.00
Kayu Kamper papan 0.00180 M3 10,700,000.00 19,260.00
Tenaga
Tukang besi 0.10000 Oh 57,500.00 5,750.00
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00050 Oh 68,000.00 34.00
10,909.00 52,580.00
8 1 m2 Pasang kawat nyamuk
Bahan
Kawat Nyamuk aluminium 1.10000 M2 7,200.00 7,920.00
Paku biasa 0.02000 Kg 16,000.00 320.00
Kayu Kamper papan 0.00180 M3 10,700,000.00 19,260.00
Tenaga
Tukang besi 0.10000 Oh 57,500.00 5,750.00
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00050 Oh 68,000.00 34.00
10,909.00 27,500.00
9 1 m2 Pasang jendela nako & tralis
Bahan
Naco (Kerangka dan Daun ) 1.10000 M2 240,000.00 264,000.00
Paku Sekrup 0.02000 Kg 600.00 12.00
Teralis Besi 0.02500 M2 300,000.00 7,500.00
Tenaga
Tukang besi 0.20000 Oh 57,500.00 11,500.00
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00100 Oh 68,000.00 68.00
21,818.00 271,512.00
10 1 m` Pasang talang datar, seng bjls 30
Bahan
Seng Plat BJLS 30 lebar 0,90 m 0.50000 M' 41,000.00 20,500.00
Paku biasa 0.01500 Kg 16,000.00 240.00
Kayu Meranti Papan 0.00960 M3 5,900,000.00 56,640.00
Cat Meny besi 0.25000 Kg 15,000.00 3,750.00
Tenaga
Tukang besi 0.40000 Oh 57,500.00 23,000.00
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00125 Oh 68,000.00 85.00
31,397.50 81,130.00
11 1 m` Pasang talang miring, seng bjls 30
Bahan
Seng Plat BJLS 30 lebar 0,90 m 0.50000 M' 41,000.00 20,500.00
Paku biasa 0.01500 Kg 16,000.00 240.00

124
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kayu Meranti Papan 0.01900 M3 5,900,000.00 112,100.00
Cat Meny besi 0.30000 Kg 15,000.00 4,500.00
Tenaga
Tukang besi 0.40000 Oh 57,500.00 23,000.00
Pekerja / Buruh tak terlatih 0.04000 Oh 45,000.00 1,800.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00125 Oh 68,000.00 85.00
26,447.50 137,340.00
12 1 m’ Pasang talang ½ lingkaran D-10 cm, seng bjls 30
Bahan
Seng Plat BJLS 30 lebar 0,90 m 0.30000 M' 41,000.00 12,300.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Kayu Meranti Papan 0.01900 M3 5,900,000.00 112,100.00
Besi plat 0.50000 Kg 12,000.00 6,000.00
Tenaga
Tukang besi 0.15000 Oh 57,500.00 8,625.00
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00125 Oh 68,000.00 85.00
21,522.50 132,000.00

125
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
13 1 m’ Pasang talang ½ lingkaran D-10 cm, seng bjls 20
Bahan
Seng Plat BJLS 20 lebar 0,90 m 0.30000 M' 10,800.00 3,240.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Kayu Meranti Papan 0.01900 M3 5,900,000.00 112,100.00
Besi plat 0.50000 Kg 12,000.00 6,000.00
Tenaga
Tukang besi 0.15000 Oh 57,500.00 8,625.00
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00125 Oh 68,000.00 85.00
21,522.50 122,940.00
XII. PEKERJAAN KUNCI DAN KACA

1 1 bh Pasang kunci tanam biasa


Bahan
Slot ( Kunci-kunci pintu ) lokal 1.00000 Bh 60,000.00 60,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang kayu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
30,165.00 60,000.00
2 1 bh Pasang kunci tanam SES ( pelor )
Bahan
Kunci tanam merk SES ( pelor ) 1.00000 Bh 145,200.00 145,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.00300 Oh 68,000.00 204.00
41,154.00 145,200.00
3 1 bh Pasang kunci tanam SES
Bahan
Selot ( kunci pintu ) merk SES 1.00000 Bh 210,000.00 210,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.00300 Oh 68,000.00 204.00
41,154.00 210,000.00
4 1 bh Pasang selot rossete dekson
Bahan
Selot Rossete Dekson 1.00000 Bh 329,000.00 329,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.00300 Oh 68,000.00 204.00

126
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
41,154.00 329,000.00
5 1 bh Pasang engsel jendela biasa
Bahan
Engsel Jendela ( H ) 1.00000 Bh 6,600.00 6,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 6,600.00
6 1 bh Pasang engsel pintu biasa
Bahan
Engsel Pintu ( H ) 1.00000 Bh 7,700.00 7,700.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 7,700.00

127
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
7 1 bh Pasang engsel stainllesstel dekson 3"
Bahan
Engsel Stainlesstel Dekson 3" 1.00000 Bh 48,000.00 48,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 48,000.00
8 1 bh Pasang engsel stainllesstel dekson 4"
Bahan
Engsel Stainlesstel Dekson 4" 1.00000 Bh 96,000.00 96,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 96,000.00
9 1 bh Pasang engsel stainllesstel dekson 5"
Bahan
Engsel Stainlesstel Dekson 5" 1.00000 Bh 107,000.00 107,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 107,000.00
10 1 bh Pasang grendel pintu panjang
Bahan :
Grendel Pintu Panjang ( sespen ) 1.00000 Bh 12,100.00 12,100.00
Tenaga :
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 12,100.00
11 1 bh Pasang grendel jendela SES
Bahan :
Grendel jendela merk SES 1.00000 Bh 21,000.00 21,000.00
Tenaga :
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 21,000.00
12 1 bh Pasang grendel tanam SES
Bahan :
Grendel tanam merk SES 1.00000 Bh 52,800.00 52,800.00
Tenaga :

128
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 52,800.00
13 1 bh Pasang grendel pintu ganda dekson 40 cm
Bahan :
Grendel pintu ganda Dekson 40 cm komplit 1.00000 Bh 118,000.00 118,000.00
Tenaga :
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 118,000.00
14 1 bh Pasang hak angin
Bahan
Hak Angin 1.00000 Bh 9,900.00 9,900.00

129
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 9,900.00
15 1 bh Pasang hak angin SES
Bahan
Hak angin Merk SES 1.00000 Bh 30,000.00 30,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 30,000.00
16 1 bh Pasang handel pintu stainlesstel kecil
Bahan
Handle pintu stanless steel kecil 1.00000 Bh 15,000.00 15,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Tukang kayu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.05000 Oh 62,500.00 3,125.00
Mandor 0.00250 Oh 68,000.00 170.00
34,295.00 15,000.00
17 1 bh Pasang handel pintu stainlesstel besar
Bahan
Handle pintu stanless steel besar 1.00000 Bh 90,000.00 90,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Tukang kayu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.05000 Oh 62,500.00 3,125.00
Mandor 0.00250 Oh 68,000.00 170.00
34,295.00 90,000.00
18 1 bh Pasang handel pintu ganda dekson 30 cm
Bahan
Handle pintu ganda Dekson 30 cm komplit 1.00000 Bh 553,000.00 553,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Tukang kayu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.05000 Oh 62,500.00 3,125.00
Mandor 0.00250 Oh 68,000.00 170.00
34,295.00 553,000.00
19 1 bh Pasang handel pintu ganda dekson 40 cm
Bahan
Handle pintu ganda Dekson 40 cm komplit 1.00000 Bh 590,000.00 590,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Tukang kayu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.05000 Oh 62,500.00 3,125.00

130
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00250 Oh 68,000.00 170.00
34,295.00 590,000.00
20 1 bh Pasang rel pintu dorong
Bahan
Rel pintu dorong 1.00000 Bh 245,000.00 245,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.00300 Oh 68,000.00 204.00
41,154.00 245,000.00
21 1 m2 Pasang kaca , tebal 3 mm
Bahan
Kaca Bening Uk. 3 mm 1.10000 M2 52,800.00 58,080.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 58,080.00

131
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
22 1 m2 Pasang kaca , tebal 5 mm
Bahan
Kaca Bening Uk. 5 mm 1.10000 M2 54,000.00 59,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 59,400.00
23 1 m2 Pasang kaca Ry band , tebal 5 mm
Bahan
Kaca Ray-band Uk. 5 mm 1.10000 M2 79,200.00 87,120.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 87,120.00
24 1 m2 Pasang kaca patri , tebal 5 mm
Bahan
Kaca patry 1.10000 M2 2,272,800.00 2,500,080.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 2,500,080.00
25 1 m2 Pasang kaca air tbl. 5 mm
Bahan :
Kaca air 5 Cm 1.10000 M2 85,800.00 94,380.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 94,380.00

XIII. PEKRJAAN PENUTUP LANTAI

1 1 m2 Pasang lantai ubin pc abu-abu ukuran 20x20 cm


Bahan
Ubin Abu-abu Uk. 20Cm x 20Cm 1.06000 Bh 27,500.00 29,150.00
PC / Portland cement 10.40000 Kg 1,450.00 15,080.00
Pasir pasang / beton 0.01350 M3 120,000.00 1,620.00
Tenaga
Pekerja / Buruh tak terlatih 0.27000 Oh 45,000.00 12,150.00
Tukang batu 0.13000 Oh 57,500.00 7,475.00
Kepala Tukang 0.01300 Oh 62,500.00 812.50
Mandor 0.01350 Oh 68,000.00 918.00

132
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
21,355.50 45,850.00
2 1 m2 Pasang lantai keramik ukuran 20x20 cm
Bahan
Keramik Uk. 20Cm x 20Cm 1.05200 M2 40,800.00 42,921.60
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 72,119.10
3 1 m2 Pasang lantai keramik tekstur ukuran 20x20 cm
Bahan
Keramik tekstur Uk. 20cm x 20 cm 1.05200 M2 43,000.00 45,236.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00

133
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 74,433.50
4 1 m2 Pasang lantai keramik tekstur ukuran 30x30 cm
Bahan
Keramik tekstur Uk. 30cm x 30 cm 1.05200 M2 49,000.00 51,548.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 80,745.50
5 1 m2 Pasang lantai Granit ( ex Granito ) warna terang ukuran 40x40 cm
Bahan
Granit (ex Granito) warna terang Uk. 40x40 cm 1.05200 M2 122,000.00 128,344.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 157,541.50
6 1 m2 Pasang lantai Granit ( ex Granito ) warna gelap ukuran 40x40 cm
Bahan
Granit (ex Granito) warna gelap Uk. 40x40 cm 1.05200 M2 134,000.00 140,968.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 170,165.50
7 1 m2 Pasang lantai Granit ( ex Granito ) tektur ukuran 40x40 cm
Bahan
Granit (ex Granito) tekstur Uk. 40x40 cm 1.05200 M2 201,000.00 211,452.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga

134
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 240,649.50
8 1 m2 Pasang lantai Granit ( ex Granito ) tektur ukuran 60x60 cm
Bahan
Granit (ex Granito) tekstur Uk. 60x60 cm 1.05200 M2 286,000.00 300,872.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 330,069.50

135
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
9 1 m2 Pasang lantai Granit ( ex Granito ) warna terang ukuran 60x60 cm
Bahan
Granit (ex Granito) warna terang Uk. 60x60 cm 1.05200 M2 207,000.00 217,764.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 246,961.50
10 1 m2 Pasang lantai Granit ( ex Granito ) warna gelap ukuran 60x60 cm
Bahan
Granit (ex Granito) warna gelap Uk. 60x60 cm 1.05200 M2 231,000.00 243,012.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 272,209.50
11 1 m2 Pasang lantai batu lempeng
Bahan
Batu lempeng 1.05200 M2 82,500.00 86,790.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 115,987.50
12 1 m2 Pasang lantai marmer bakar
Bahan
Marmer bakar 1.05200 M2 99,000.00 104,148.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 133,345.50
13 1 m2 Pasang lantai Keramik putih ukuran 40x40 cm

136
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
Keramik putih Uk. 40cm x 40 cm 1.05200 M2 36,000.00 37,872.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 67,069.50
14 1 m2 Pasang lantai Keramik warna ukuran 40x40 cm
Bahan
Keramik motif Uk. 40 cm x 40 cm 1.05200 M2 44,000.00 46,288.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00

137
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 75,485.50
15 1 m2 Pasang lantai Keramik putih ukuran 30x30 cm
Bahan
Keramik putih Uk. 30 cm x 30 cm 1.05200 M2 30,000.00 31,560.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 60,757.50
16 1 m2 Pasang lantai Keramik warna ukuran 30x30 cm
Bahan
Keramik motif Uk. 30 cm x 30 cm 1.05200 M2 38,000.00 39,976.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 69,173.50
17 1 m2 Pasang lantai marmer
Bahan
Marmer Putih 1.05200 Bh 172,000.00 180,944.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 210,141.50
18 1 m2 Pasang lantai granit motif
Bahan
Batu granit motif 1.05200 Bh 165,000.00 173,580.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga

138
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 202,777.50
19 1 m2 Pasang lantai batu candi hitam
Bahan
Batu candi hitam 1.05200 Bh 106,000.00 111,512.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 140,709.50

139
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
20 1 m2 Pasang lantai andesit 30 x 30 cm
Bahan
Batu Andesit 30 x 30 cm 1.05200 Bh 152,000.00 159,904.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 120,000.00 4,680.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 189,101.50

21 1 m2 Pasang Paving Stone / conblok Warna Tebal 6 Cm K225


Tenaga :
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Bahan :
Paving Stone / Conblok warna tebal 6 cm, K225 1.10000 M2 54,000.00 59,400.00
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
63,600.00 12,450.00
22 1 m2 Pasang Paving Stone / conblok Abu-abu Tebal 6 Cm K225
Tenaga :
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Bahan :
Paving Stone / Conblok abu - abu tebal 6 cm, K2 1.10000 M2 47,000.00 51,700.00
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
55,900.00 12,450.00
23 1 m2 Pasang Paving Stone / conblok Warna Tebal 8 Cm K225
Tenaga :
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Bahan :
Paving Stone / Conblok warna tebal 8 cm, K225 1.10000 M2 59,000.00 64,900.00
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
69,100.00 12,450.00
24 1 m2 Pasang Paving Stone / conblok Abu-abu Tebal 8 Cm K225
Tenaga :
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Bahan :
Paving Stone / Conblok abu - abu tebal 8 cm, K2 1.10000 M2 52,800.00 58,080.00
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
62,280.00 12,450.00
25 1 m2 Pasang Paving Stone / Conblok 5 Warna Uk 10 x 10 cm
Bahan :
Paving Stone / conblok (10x10) 5 warna 1.10000 m2 65,000.00 71,500.00
Pasir pasang / beton 0.03500 m3 120,000.00 4,200.00

140
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga :
Tukang batu 0.06000 m2 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 m2 45,000.00 9,000.00
12,450.00 75,700.00
26 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm K 300
Bahan :
Paving Stone / Conblok abu - abu tebal 6 cm, K3 1.10000 m2 50,000.00 55,000.00
Pasir pasang / beton 0.03500 m3 120,000.00 4,200.00
Tenaga :
Tukang batu 0.06000 m2 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 m2 45,000.00 9,000.00
12,450.00 59,200.00
27 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm K 400
Bahan :
Paving Stone / Conblok abu - abu tebal 6 cm, K4 1.10000 m2 53,000.00 58,300.00
Pasir pasang / beton 0.03500 m3 120,000.00 4,200.00
Tenaga :
Tukang batu 0.06000 m2 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 m2 45,000.00 9,000.00
12,450.00 62,500.00

141
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
28 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm
Bahan :
Paving Stone / Conblok abu - abu tebal 6 cm 1.10000 m2 34,000.00 37,400.00
Pasir pasang / beton 0.03500 m3 120,000.00 4,200.00
Tenaga :
Tukang batu 0.06000 m2 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 m2 45,000.00 9,000.00
12,450.00 41,600.00
29 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 8 cm
Bahan :
Paving StonE / Conblok abu - abu tebal 8 cm 1.10000 m2 36,000.00 39,600.00
Pasir pasang / beton 0.03500 m3 120,000.00 4,200.00
Tenaga :
Tukang batu 0.06000 m2 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 m2 45,000.00 9,000.00
12,450.00 43,800.00
30 1 m2 Pasang dinding keramik putih Uk. 20x25 cm
Bahan
Keramik dinding putih ukuran 20/25 Cm 1.06000 Bh 43,000.00 45,580.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 120,000.00 2,160.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang batu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 65,105.00
31 1 m2 Pasang dinding keramik motif Uk. 20x25 cm
Bahan
Keramik dinding motif Uk. 20cm x 25 cm 1.06000 Bh 44,000.00 46,640.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 120,000.00 2,160.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang batu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 66,165.00
32 1 m2 Pasang dinding keramik Uk. 20x33 cm
Bahan
Keramik dinding Uk. 20cm x 33 cm 1.06000 Bh 59,000.00 62,540.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 120,000.00 2,160.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang batu 0.45000 Oh 57,500.00 25,875.00

142
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 82,065.00
33 1 m2 Pasang dinding keramik cutting Uk. 30x50 cm
Bahan
Keramik cutting Uk. 30cm x 50 cm 1.06000 Bh 98,000.00 103,880.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 120,000.00 2,160.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang batu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 123,405.00
34 1 m2 Pasang dinding keramik Cutting Uk. 31x63 cm
Bahan
Keramik cutting Uk. 31cm x 63 cm 1.06000 Bh 165,000.00 174,900.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 120,000.00 2,160.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00

143
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang batu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 194,425.00
35 1 m2 Pasang dinding keramik tekstur Cutting Uk. 31x63 cm
Bahan
Keramik tekstur cutting Uk. 31cm x 63 cm 1.06000 Bh 183,000.00 193,980.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 120,000.00 2,160.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang batu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 213,505.00
36 1 m2 Pasang dinding batu lempeng
Bahan
Batu Lempeng 1.05000 M2 82,500.00 86,625.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 107,862.50
37 1 m2 Pasang dinding batu andesit alur
Bahan
Batu Andesit alur 1.05000 M2 191,500.00 201,075.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 222,312.50
38 1 m2 Pasang dinding batu andesit 30 x 30 cm
Bahan
Batu Andesit 30 x 30 cm 1.05000 M2 152,000.00 159,600.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50

144
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 180,837.50
39 1 m2 Pasang dinding batu candi hitam
Bahan
Batu candi hitam 1.05000 M2 106,000.00 111,300.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 132,537.50
40 1 m2 Pasang dinding batu susun sirih
Bahan
Batu susun sirih 1.05000 M2 231,000.00 242,550.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00

145
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 263,787.50
41 1 m2 Pasang dinding batu salagedang
Bahan
Batu Salagedang 1.05000 M2 92,500.00 97,125.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 118,362.50
42 1 m2 Pasang dinding batu paras grobongan
Bahan
Batu paras Grobongan 1.05000 M2 82,500.00 86,625.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 107,862.50
43 1 m2 Pasang dinding batu granit motif
Bahan
Batu granit motif 1.05000 M2 165,000.00 173,250.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 194,487.50
44 1 m2 Pasang dinding batu marmo biasa
Bahan
Batu marmo biasa 1.05000 M2 65,500.00 68,775.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00

146
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
52,252.50 90,012.50
45 1 m2 Pasang dinding batu marmo warna
Bahan
Batu marmo warna 1.05000 M2 90,000.00 94,500.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 115,737.50
46 1 m2 Pasang dinding batu bobos
Bahan
Batu Bobos 1.05000 M2 99,000.00 103,950.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00

147
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 125,187.50
47 1 m2 Pasang dinding batu warna ( hias )
Bahan
Batu warna ( hias ) 1.05000 M2 80,000.00 84,000.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 120,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 105,237.50
48 1 m' Plint kayu 2 x 10 cm
Bahan
Kayu jati papan lokal 0.00240 M3 19,800,000.00 47,520.00
Paku Sekrup 0.05000 Kg 600.00 30.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 47,550.00
49 1 m2 Lantai Patlag 1 Lapis Bata merah camp. 1 Sm : 1 Kpr : 3 Psr
Tenaga :
Tukang batu 0.16000 Oh 57,500.00 9,200.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Mandor 0.02500 Oh 68,000.00 1,700.00
Bahan :
Batu Bata / Merah 30.00000 Bj 600.00 18,000.00
Kapur Batu 0.01200 M3 436,400.00 5,236.80
Semen Merah 0.01200 M3 119,000.00 1,428.00
Pasir pasang / beton 0.03600 M3 120,000.00 4,320.00
13,775.00 28,984.80
50 1 m' Plint keramik uk 10 x 20 cm
Bahan
Keramik Arstistik Uk. 10 x 20 cm 5.00000 bh 16,800.00 84,000.00
PC / Portland cement 1.65000 Kg 1,450.00 2,392.50
Pasir pasang / beton 0.00320 m3 120,000.00 384.00
Semen Putih / warna 0.10000 kg 2,000.00 200.00
Tenaga
Pekerja / Buruh tak terlatih 0.09000 Oh 45,000.00 4,050.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50

148
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00450 Oh 68,000.00 306.00
10,093.50 86,976.50

XIV. PEKERJAAN PENGECATAN

1 1 m2 Mengikis/mengerok permukaan cat tembok lama


Bahan
Soda api 0.05000 Kg 33,000.00 1,650.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Mandor 0.00250 Oh 68,000.00 170.00
6,920.00 1,650.00
2 1 m2 Pengecatan bidang kayu lama
Bahan
Plamur kayu 0.15000 Kg 15,600.00 2,340.00
Cat Kayu Emco 0.17000 Kg 50,000.00 8,500.00
Cat Kayu Emco 0.17000 Kg 50,000.00 8,500.00

149
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.07000 Oh 45,000.00 3,150.00
Tukang cat 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00750 Oh 62,500.00 468.75
Mandor 0.00250 Oh 68,000.00 170.00
8,101.25 19,340.00
3 1 m2 Pengecatan bidang kayu baru (1 lps plamir),1 lps cat dasar, 2 lps cat penutup.
Bahan
Cat Meny kayu 0.20000 Kg 15,300.00 3,060.00
Plamur kayu 0.15000 Kg 15,600.00 2,340.00
Cat Kayu Emco 0.17000 kg 50,000.00 8,500.00
Cat Kayu Emco 0.26000 Kg 50,000.00 13,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.07000 Oh 45,000.00 3,150.00
Tukang cat 0.00900 Oh 57,500.00 517.50
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00250 Oh 68,000.00 170.00
4,212.50 26,900.00
4 1 m2 Pengecatan bidang kayu baru (1 lps plamir), 1 lps cat dasar, 3 lpis cat penutup.
Bahan
Cat Meny kayu 0.20000 Kg 15,300.00 3,060.00
Plamur kayu 0.15000 Kg 15,600.00 2,340.00
Cat Kayu Emco 0.17000 kg 50,000.00 8,500.00
Cat Kayu Emco 0.35000 Kg 50,000.00 17,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.07000 Oh 45,000.00 3,150.00
Tukang cat 0.10500 Oh 57,500.00 6,037.50
Kepala Tukang 0.00400 Oh 62,500.00 250.00
Mandor 0.00250 Oh 68,000.00 170.00
9,607.50 31,400.00
5 1 m2 Pelaburan bidang kayu dengan teak oil
Bahan
Teak oil 0.36000 Ltr 7,000.00 2,520.00
Tenaga
Pekerja / Buruh tak terlatih 0.04000 Oh 45,000.00 1,800.00
Tukang cat 0.06300 Oh 57,500.00 3,622.50
Kepala Tukang 0.06300 Oh 62,500.00 3,937.50
Mandor 0.00250 Oh 68,000.00 170.00
9,530.00 2,520.00
6 1 m2 Pelaburan bidang kayu dengan politur
Bahan
Politur jadi 0.15000 Ltr 42,000.00 6,300.00
Politur jadi 0.37200 Ltr 42,000.00 15,624.00
Kertas gosok ( rempelas ) 2.00000 Lbr 2,400.00 4,800.00
Tenaga
Pekerja / Buruh tak terlatih - Oh 45,000.00
Tukang cat 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.01600 Oh 62,500.00 1,000.00
Mandor 0.00250 Oh 68,000.00 170.00

150
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
4,620.00 26,724.00
7 1 m2 Pelaburan bidang kayu dengan cat residu dan ter
Bahan
Residu ( Ter ) 0.35000 Ltr 5,500.00 1,925.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Mandor 0.00600 Oh 68,000.00 408.00
4,908.00 1,925.00
8 1 m2 Pelaburan bidang kayu dengan vernis
Bahan
Vernis 0.15000 Ltr 32,800.00 4,920.00
Dempul Kayu 0.05000 Kg 15,600.00 780.00
Kertas gosok ( rempelas ) 0.10000 Lbr 2,400.00 240.00
Kuas Eterna 4 " 0.01000 bh 11,000.00 110.00
Tenaga
Pekerja / Buruh tak terlatih 0.16000 Oh 45,000.00 7,200.00
Tukang cat 0.16000 Oh 57,500.00 9,200.00
Kepala Tukang 0.01600 Oh 62,500.00 1,000.00
Mandor 0.00250 Oh 68,000.00 170.00
17,570.00 6,050.00

151
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
9 1 m2 Pengecatan tembok baru (1 lapis plamir,1 lapis cat dasar, 2 lapis cat penutup)
Bahan
Plamur Tembok 0.10000 Kg 9,300.00 930.00
Cat Tembok 0.10000 Kg 20,000.00 2,000.00
Cat Tembok 0.26000 Kg 20,000.00 5,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.02000 Oh 45,000.00 900.00
Tukang cat 0.06300 Oh 57,500.00 3,622.50
Kepala Tukang 0.00630 Oh 62,500.00 393.75
Mandor 0.00250 Oh 68,000.00 170.00
5,086.25 8,130.00
10 1 m2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
Bahan
Cat Tembok 0.12000 Kg 20,000.00 2,400.00
Cat Tembok 0.18000 Kg 20,000.00 3,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.02800 Oh 45,000.00 1,260.00
Tukang cat 0.04200 Oh 57,500.00 2,415.00
Kepala Tukang 0.00420 Oh 62,500.00 262.50
Mandor 0.00250 Oh 68,000.00 170.00
4,107.50 6,000.00
11 1 m2 Pegecatan permukaan baja dengan meni besi
Bahan
Cat Meny besi 0.10000 Kg 15,000.00 1,500.00
Kuas Eterna 4 " 0.01000 Bh 11,000.00 110.00
Tenaga
Pekerja / Buruh tak terlatih 0.02000 Oh 45,000.00 900.00
Tukang cat 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01000 Oh 68,000.00 680.00
14,330.00 1,610.00
12 1 m2 Pegecatan permukaan baja dengan meni besi dan perancah
Bahan
Cat Meny besi 0.10000 Kg 15,000.00 1,500.00
Kuas Eterna 4 " 0.01000 Bh 11,000.00 110.00
Kayu bekisting 0.00200 M3 2,500,000.00 5,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang cat 0.22500 Oh 57,500.00 12,937.50
Kepala Tukang 0.02250 Oh 62,500.00 1,406.25
Mandor 0.00750 Oh 68,000.00 510.00
26,103.75 6,610.00
13 1 m2 Pengecatan Plafond lama (1 lapis cat dasar, 2 lapis cat penutup)
Bahan :
Cat Tembok 0.30000 Kg 20,000.00 6,000.00
Tenaga :
Pekerja / Buruh tak terlatih 0.02800 Oh 45,000.00 1,260.00
Tukang cat 0.04200 Oh 57,500.00 2,415.00
Kepala Tukang 0.00420 Oh 62,500.00 262.50

152
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00250 Oh 68,000.00 170.00
4,107.50 6,000.00
Pengecatan plafond lama 1,25 x 5,134.38 7,500.00

14 1 m2 Pengecatan Plafond baru (1 lapis plamir,1 lapis cat dasar, 2 lapis cat penutup)
Bahan :
Plamur Tembok 0.10000 Kg 9,300.00 930.00
Cat Tembok 0.36000 Kg 20,000.00 7,200.00
Tenaga :
Pekerja / Buruh tak terlatih 0.02000 Oh 45,000.00 900.00
Tukang cat 0.06300 Oh 57,500.00 3,622.50
Kepala Tukang 0.00630 Oh 62,500.00 393.75
Mandor 0.00250 Oh 68,000.00 170.00
5,086.25 8,130.00
Pengecatan plafond baru 1,25 x 6,357.81 10,162.50

153
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
15 1 m2 Couttting ( Glasur batu alam )
Bahan :
Coatting 0.35000 Ltr 60,000.00 21,000.00
HCL / air keras 0.16000 Ltr 12,000.00 1,920.00
Tenaga :
Tukang cat 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00800 Oh 62,500.00 500.00
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Mandor 0.00300 Oh 68,000.00 204.00
7,266.50 22,920.00
16 1 m2 Pengecatan genteng ( 1 lapis cat dasar, 2 lapis cat penutup)
Bahan
Cat genteng 0.12000 Kg 54,000.00 6,480.00
Cat genteng 0.18000 Kg 54,000.00 9,720.00
Tenaga
Pekerja / Buruh tak terlatih 0.02800 Oh 45,000.00 1,260.00
Tukang cat 0.04200 Oh 57,500.00 2,415.00
Kepala Tukang 0.00420 Oh 62,500.00 262.50
Mandor 0.00250 Oh 68,000.00 170.00
4,107.50 16,200.00
17 1 m2 Pengecatan tembok interior premium
Bahan
Plamur Tembok 0.10000 Kg 9,300.00 930.00
Cat Tembok interior premium 0.10000 Kg 59,000.00 5,900.00
Cat Tembok interior premium 0.26000 Kg 59,000.00 15,340.00
Tenaga
Pekerja / Buruh tak terlatih 0.02000 Oh 45,000.00 900.00
Tukang cat 0.06300 Oh 57,500.00 3,622.50
Kepala Tukang 0.00630 Oh 62,500.00 393.75
Mandor 0.00250 Oh 68,000.00 170.00
5,086.25 22,170.00
18 1 m2 Pengecatan tembok eksterior weathershield
Bahan
Plamur Tembok 0.10000 Kg 9,300.00 930.00
Cat Tembok exterior wheathershield 0.10000 Kg 78,000.00 7,800.00
Cat Tembok exterior wheathershield 0.26000 Kg 78,000.00 20,280.00
Tenaga
Pekerja / Buruh tak terlatih 0.02000 Oh 45,000.00 900.00
Tukang cat 0.06300 Oh 57,500.00 3,622.50
Kepala Tukang 0.00630 Oh 62,500.00 393.75
Mandor 0.00250 Oh 68,000.00 170.00
5,086.25 29,010.00
19 1 m2 Pengecatan Permukaan Baja lapis seng secara manual sistem 1 lapis dengan tebal 200 um
Bahan :
Cat besi 0.30000 Kg 42,000.00 12,600.00
Tenaga :
Pekerja / Buruh tak terlatih 0.00600 Oh 45,000.00 270.00
Tukang cat 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00

154
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00600 Oh 68,000.00 408.00
4,878.00 12,600.00
20 1 m2 Pengecatan Permukaan Baja lapis seng secara semprot sistem 1 lapis dengan tebal 200 um
Bahan :
Cat besi 0.30000 Kg 42,000.00 12,600.00
Tenaga :
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Tukang cat 0.70000 Oh 57,500.00 40,250.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.20000 Oh 68,000.00 13,600.00
84,350.00 12,600.00

155
ONESIA BANGUNAN GEDUNG DAN PERUMAHAN
NSTRUKSI ( ABK ) TAHUN 2013 TRIWULAN I

JUMLAH
(Rp)
9= (7+8)

521,465.00

581,815.00

156
JUMLAH
(Rp)
9= (7+8)

218,640.00

93,435.00

157
JUMLAH
(Rp)
9= (7+8)

1,886,414.00

1,404,175.00

158
JUMLAH
(Rp)
9= (7+8)
1,810,175.00

7,900.00

159
JUMLAH
(Rp)
9= (7+8)

1,384,000.00

268,832.00

25,486.50

86,950.00

322,659.00

302,259.00

160
JUMLAH
(Rp)
9= (7+8)

5,428.80

20,720.00

27,206.00

38,039.00

32,341.00

64,750.00

42,679.00

2,590.00

26,620.00

161
JUMLAH
(Rp)
9= (7+8)

9,932.00

25,900.00

79,700.00

166,417.60

197,755.50

13,770.00

120,950.00

162
JUMLAH
(Rp)
9= (7+8)

71,930.00

102,680.00

881,930.00

714,240.00

163
JUMLAH
(Rp)
9= (7+8)

646,440.00

626,950.00

574,600.00

538,330.00

512,820.00

164
JUMLAH
(Rp)
9= (7+8)

475,120.00

468,316.60

411,068.00

165
JUMLAH
(Rp)
9= (7+8)

586,094.80

487,490.80

455,228.40

258,994.50

166
JUMLAH
(Rp)
9= (7+8)

1,481,507.50

167
JUMLAH
(Rp)
9= (7+8)

813,265.00

921,491.90

643,533.60

168
JUMLAH
(Rp)
9= (7+8)

227,963.50

200,715.00

169
JUMLAH
(Rp)
9= (7+8)

186,737.50

177,697.50

172,470.00

169,505.00

170
JUMLAH
(Rp)
9= (7+8)

165,757.00

107,465.00

171
JUMLAH
(Rp)
9= (7+8)

95,832.50

89,431.50

85,630.00

83,231.00

172
JUMLAH
(Rp)
9= (7+8)

81,739.00

79,220.00

173
JUMLAH
(Rp)
9= (7+8)

82,866.00

75,952.20

74,930.60

793,225.00
79,322.50

174
JUMLAH
(Rp)
9= (7+8)

39,536.50

175
JUMLAH
(Rp)
9= (7+8)

33,636.50

30,918.50

29,182.50

28,146.50

27,338.50

176
JUMLAH
(Rp)
9= (7+8)

26,298.50

30,463.70

177
JUMLAH
(Rp)
9= (7+8)

26,208.90

28,054.50

25,321.10

24,930.30

178
JUMLAH
(Rp)
9= (7+8)

48,316.00

43,630.00

179
JUMLAH
(Rp)
9= (7+8)

40,796.00

38,780.50

37,498.00

32,008.60

51,169.00

180
JUMLAH
(Rp)
9= (7+8)

48,371.50

45,440.00

181
JUMLAH
(Rp)
9= (7+8)

43,327.00

59,725.00

56,555.00

52,898.50

182
JUMLAH
(Rp)
9= (7+8)
48,633.00

24,528.00

22,738.00

40,979.00

38,105.50

183
JUMLAH
(Rp)
9= (7+8)

8,226.00

26,829.00

19,940.50

6,962.50

184
JUMLAH
(Rp)
9= (7+8)

27,065,490.00

22,685,400.00

13,690,400.00

12,970,400.00

10,810,400.00

185
JUMLAH
(Rp)
9= (7+8)

10,810,400.00

7,930,400.00

6,490,400.00

469,911.50

448,311.50

1,444,139.00

186
JUMLAH
(Rp)
9= (7+8)

999,775.00

635,775.00

611,775.00

539,775.00

187
JUMLAH
(Rp)
9= (7+8)

539,775.00

443,775.00

387,775.00

1,273,958.50

885,140.00

188
JUMLAH
(Rp)
9= (7+8)

566,640.00

545,640.00

189
JUMLAH
(Rp)
9= (7+8)

482,640.00

482,640.00

398,640.00

349,640.00

2,234,832.40

190
JUMLAH
(Rp)
9= (7+8)

1,523,850.00

955,050.00

191
JUMLAH
(Rp)
9= (7+8)

916,650.00

801,450.00

801,450.00

647,850.00

558,250.00

192
JUMLAH
(Rp)
9= (7+8)

2,008,646.00

1,342,100.00

193
JUMLAH
(Rp)
9= (7+8)

796,100.00

760,100.00

652,100.00

652,100.00

508,100.00

194
JUMLAH
(Rp)
9= (7+8)

424,100.00

610,800.00

195
JUMLAH
(Rp)
9= (7+8)

432,440.00

420,680.00

385,400.00

385,400.00

196
JUMLAH
(Rp)
9= (7+8)

338,360.00

197
JUMLAH
(Rp)
9= (7+8)

310,920.00

651,720.00

473,360.00

461,600.00

198
JUMLAH
(Rp)
9= (7+8)

426,320.00

426,320.00

199
JUMLAH
(Rp)
9= (7+8)

351,840.00

785,925.00

607,565.00

200
JUMLAH
(Rp)
9= (7+8)

595,805.00

560,525.00

201
JUMLAH
(Rp)
9= (7+8)

560,525.00

513,485.00

486,045.00

202
JUMLAH
(Rp)
9= (7+8)

789,425.00

611,065.00

203
JUMLAH
(Rp)
9= (7+8)

599,305.00

564,025.00

564,025.00

204
JUMLAH
(Rp)
9= (7+8)

516,985.00

489,545.00

205
JUMLAH
(Rp)
9= (7+8)

966,730.00

788,370.00

776,610.00

206
JUMLAH
(Rp)
9= (7+8)

741,330.00

741,330.00

207
JUMLAH
(Rp)
9= (7+8)

694,290.00

666,850.00

22,337,400.00

12,437,400.00

208
JUMLAH
(Rp)
9= (7+8)

11,777,400.00

9,797,400.00

209
JUMLAH
(Rp)
9= (7+8)

9,797,400.00

5,837,400.00

21,989,160.00

12,089,160.00

210
JUMLAH
(Rp)
9= (7+8)

11,429,160.00

9,449,160.00

211
JUMLAH
(Rp)
9= (7+8)

9,449,160.00

6,809,160.00

5,489,160.00

244,015.00

212
JUMLAH
(Rp)
9= (7+8)

136,015.00

128,815.00

213
JUMLAH
(Rp)
9= (7+8)

107,215.00

107,215.00

78,415.00

64,015.00

214
JUMLAH
(Rp)
9= (7+8)

244,015.00

136,015.00

215
JUMLAH
(Rp)
9= (7+8)

128,815.00

107,215.00

107,215.00

78,415.00

216
JUMLAH
(Rp)
9= (7+8)

64,015.00

282,415.00

217
JUMLAH
(Rp)
9= (7+8)

156,415.00

148,015.00

122,815.00

122,815.00

89,215.00

218
JUMLAH
(Rp)
9= (7+8)

72,415.00

282,415.00

219
JUMLAH
(Rp)
9= (7+8)

156,415.00

148,015.00

122,815.00

122,815.00

220
JUMLAH
(Rp)
9= (7+8)
89,215.00

72,415.00

3,184,658.00

1,699,658.00

1,600,658.00

221
JUMLAH
(Rp)
9= (7+8)

1,303,658.00

1,303,658.00

907,658.00

709,658.00

259,787.50

222
JUMLAH
(Rp)
9= (7+8)

151,787.50

144,587.50

122,987.50

122,987.50

94,187.50

223
JUMLAH
(Rp)
9= (7+8)

79,787.50

472,805.00

265,805.00

252,005.00

210,605.00

224
JUMLAH
(Rp)
9= (7+8)

210,605.00

155,405.00

127,805.00

556,012.50

313,012.50

225
JUMLAH
(Rp)
9= (7+8)

296,812.50

248,212.50

248,212.50

183,412.50

151,012.50

226
JUMLAH
(Rp)
9= (7+8)

161,262.50

95,430.00

91,422.50

78,150.00

78,462.50

227
JUMLAH
(Rp)
9= (7+8)

60,870.00

50,790.00

237,915.00

137,815.00

131,215.00

228
JUMLAH
(Rp)
9= (7+8)

111,415.00

111,415.00

85,015.00

69,615.00

315,847.50

229
JUMLAH
(Rp)
9= (7+8)

183,897.50

175,197.50

149,097.50

149,097.50

230
JUMLAH
(Rp)
9= (7+8)
114,297.50

93,997.50

185,515.00

107,255.00

102,095.00

231
JUMLAH
(Rp)
9= (7+8)

86,615.00

86,615.00

65,975.00

53,935.00

232
JUMLAH
(Rp)
9= (7+8)

555,137.50

315,937.50

300,037.50

252,337.50

233
JUMLAH
(Rp)
9= (7+8)
252,337.50

188,737.50

234
JUMLAH
(Rp)
9= (7+8)

155,537.50

667,690.00

391,890.00

412,590.00

235
JUMLAH
(Rp)
9= (7+8)

364,890.00

236
JUMLAH
(Rp)
9= (7+8)

364,890.00

301,290.00

268,090.00

284,080.00

237
JUMLAH
(Rp)
9= (7+8)

220,380.00

216,180.00

238
JUMLAH
(Rp)
9= (7+8)

203,580.00

203,580.00

186,780.00

176,980.00

31,754.65

239
JUMLAH
(Rp)
9= (7+8)

8,951.50

240
JUMLAH
(Rp)
9= (7+8)

674,227.50

653,877.50

614,977.50

673,827.50

241
JUMLAH
(Rp)
9= (7+8)
81,173.00

1,144,250.00

242
JUMLAH
(Rp)
9= (7+8)

1,170,750.00

762,627.50

834,227.50

787,877.50

243
JUMLAH
(Rp)
9= (7+8)
891,127.50

1,004,777.50

244
JUMLAH
(Rp)
9= (7+8)

918,612.50

872,562.50

967,662.50

1,001,912.50

245
JUMLAH
(Rp)
9= (7+8)
1,254,062.50

12,577.65

246
JUMLAH
(Rp)
9= (7+8)

135,665.00

148,165.00

257,945.50

266,345.50

247
JUMLAH
(Rp)
9= (7+8)

322,845.50

248
JUMLAH
(Rp)
9= (7+8)

233,620.50

96,513.50

3,265,182.50

249
JUMLAH
(Rp)
9= (7+8)

4,109,872.50

250
JUMLAH
(Rp)
9= (7+8)

7,025,700.00

5,365,756.50

251
JUMLAH
(Rp)
9= (7+8)

4,978,380.00

252
JUMLAH
(Rp)
9= (7+8)

4,731,474.00

4,978,173.50

253
JUMLAH
(Rp)
9= (7+8)

60,859.00

254
JUMLAH
(Rp)
9= (7+8)

71,902.50

147,715.00

180,000.00

44,606.50

49,606.50

255
JUMLAH
(Rp)
9= (7+8)

47,306.50

67,326.00

256
JUMLAH
(Rp)
9= (7+8)

38,658.50

36,194.00

41,782.00

32,322.00

257
JUMLAH
(Rp)
9= (7+8)
57,235.00

135,943.00

142,151.50

258
JUMLAH
(Rp)
9= (7+8)

77,510.00

63,730.50

56,433.00

25,256.50

259
JUMLAH
(Rp)
9= (7+8)

20,876.50

16,634.50

260
JUMLAH
(Rp)
9= (7+8)

32,707.00

45,883.00

35,563.50

21,530.50

32,030.50

261
JUMLAH
(Rp)
9= (7+8)

1,240,292.50

572,492.50

262
JUMLAH
(Rp)
9= (7+8)

347,780.00

244,180.00

482,950.00

415,450.00

263
JUMLAH
(Rp)
9= (7+8)

324,380.00

354,180.00

264
JUMLAH
(Rp)
9= (7+8)

1,535,377.15

746,400.00

80,002.90

127,526.90

265
JUMLAH
(Rp)
9= (7+8)

135,776.90

266
JUMLAH
(Rp)
9= (7+8)

166,026.90

171,526.90

204,526.90

294,726.90

267
JUMLAH
(Rp)
9= (7+8)

346,644.25

268
JUMLAH
(Rp)
9= (7+8)

321,113.00

478,914.00

35,926.45

47,476.45

269
JUMLAH
(Rp)
9= (7+8)

49,676.45

28,603.50

270
JUMLAH
(Rp)
9= (7+8)

33,253.50

40,228.50

60,877.20

94,202.20

271
JUMLAH
(Rp)
9= (7+8)
109,702.20

16,203.50

19,303.50

22,403.50

32,977.20

272
JUMLAH
(Rp)
9= (7+8)

36,077.20

43,827.20

53,431.15

13,472.40

15,332.40

273
JUMLAH
(Rp)
9= (7+8)

16,804.90

145,997.40

35,476.10

48,967.40

68,330.05

274
JUMLAH
(Rp)
9= (7+8)

93,905.05

165,742.50

248,742.50

22,142.50

27,542.50

275
JUMLAH
(Rp)
9= (7+8)

36,142.50

40,442.50

45,942.50

22,165.00

276
JUMLAH
(Rp)
9= (7+8)

16,165.00

20,340.40

18,940.40

1,082,447.50

1,104,541.10

277
JUMLAH
(Rp)
9= (7+8)

540,416.10

774,541.10

278
JUMLAH
(Rp)
9= (7+8)

63,489.00

38,409.00

293,330.00

112,527.50

279
JUMLAH
(Rp)
9= (7+8)

163,787.50

153,522.50

280
JUMLAH
(Rp)
9= (7+8)

144,462.50

90,165.00

186,354.00

251,154.00

281
JUMLAH
(Rp)
9= (7+8)
370,154.00

16,888.50

17,988.50

282
JUMLAH
(Rp)
9= (7+8)

58,288.50

106,288.50

117,288.50

22,388.50

31,288.50

283
JUMLAH
(Rp)
9= (7+8)

63,088.50

128,288.50

284
JUMLAH
(Rp)
9= (7+8)

20,188.50

40,288.50

49,295.00

124,295.00

587,295.00

285
JUMLAH
(Rp)
9= (7+8)

624,295.00

286,154.00

68,368.50

286
JUMLAH
(Rp)
9= (7+8)

69,688.50

97,408.50

2,510,368.50

104,668.50

287
JUMLAH
(Rp)
9= (7+8)
67,205.50

124,371.60

288
JUMLAH
(Rp)
9= (7+8)

126,686.00

132,998.00

209,794.00

222,418.00

289
JUMLAH
(Rp)
9= (7+8)

292,902.00

382,322.00

290
JUMLAH
(Rp)
9= (7+8)

299,214.00

324,462.00

168,240.00

185,598.00

291
JUMLAH
(Rp)
9= (7+8)

119,322.00

292
JUMLAH
(Rp)
9= (7+8)

127,738.00

113,010.00

121,426.00

262,394.00

293
JUMLAH
(Rp)
9= (7+8)

255,030.00

192,962.00

294
JUMLAH
(Rp)
9= (7+8)

241,354.00

76,050.00

68,350.00

81,550.00

74,730.00

295
JUMLAH
(Rp)
9= (7+8)

88,150.00

71,650.00

74,950.00

296
JUMLAH
(Rp)
9= (7+8)

54,050.00

56,250.00

122,832.50

123,892.50

297
JUMLAH
(Rp)
9= (7+8)

139,792.50

181,132.50

298
JUMLAH
(Rp)
9= (7+8)

252,152.50

271,232.50

160,115.00

274,565.00

299
JUMLAH
(Rp)
9= (7+8)

233,090.00

184,790.00

300
JUMLAH
(Rp)
9= (7+8)

316,040.00

170,615.00

160,115.00

246,740.00

301
JUMLAH
(Rp)
9= (7+8)
142,265.00

167,990.00

302
JUMLAH
(Rp)
9= (7+8)

177,440.00

157,490.00

61,008.00

42,759.80

303
JUMLAH
(Rp)
9= (7+8)

97,070.00

8,570.00

304
JUMLAH
(Rp)
9= (7+8)

27,441.25

31,112.50

41,007.50

12,050.00

305
JUMLAH
(Rp)
9= (7+8)
31,344.00

6,833.00

23,620.00

306
JUMLAH
(Rp)
9= (7+8)

13,216.25

10,107.50

15,940.00

32,713.75

307
JUMLAH
(Rp)
9= (7+8)

10,107.50
12,634.38

13,216.25
16,520.31

308
JUMLAH
(Rp)
9= (7+8)

30,186.50

20,307.50

27,256.25

34,096.25

309
JUMLAH
(Rp)
9= (7+8)

17,478.00

96,950.00

310
REKAPITULASI
STANDAR NASIONAL INDONESIA BANGUNAN GEDUNG DAN PERUMAHAN
ANALISA BIAYA KONSTRUKSI ( ABK ) TAHUN 2013 TRIWULAN 1

PROPINSI : JAWA TIMUR


KABUPATEN : TULUNGAGUNG
SISTEM : KONTRAK
HARGA : BAWAH

HARGA SATUAN
NO. URAIAN KET.
( Rp )
1 3 4 5

I. PEKERJAAN PERSIAPAN
1 1 m` Pagar sementara dari kayu tinggi 2 meter. 521,465.00
2 1 m` Pagar sementara dari seng gelombang tinggi 2 meter. 581,815.00
3 1 m` Pagar sementara dari kawat duri tinggi 1,8 meter 218,640.00
4 1 m` Pengukuran dan pemasangan bouwplank 93,435.00
5 1 m2 Pembuatan kantor sementara, dengan lantai plesteran 1,886,414.00
6 1 m2 Pembuatan gudang semen dan alat-alat 1,404,175.00
7 1 m2 Pembuatan rumah jaga/konstruksi kayu 1,810,175.00
8 1 m2 Membersihkan lapangan dan perataan 7,900.00
9 1 m2 Pembuatan bedeng buruh 1,384,000.00
10 1 m2 Pembuatan bak adukan ukuran (40 x 50 x 20) cm 268,832.00
11 1 m2 Pembuatan Stegger dari bambu ukuran (40 x 50 x 20) cm 25,486.50
12 1 m2 Pembuatan jalan sementara/menuju bedeng 86,950.00
13 1 m3 Bongkaran beton bertulang 322,659.00
14 1 m3 Bongkaran dinding tembok bata merah 302,259.00
15 1 m’ Pasang pagar kawat jaring galvanis, tinggi 1,00 m 5,428.80

II. PEKERJAAN TANAH


1 1 m3 Galian tanah biasa sedalam 1 meter. 20,720.00
2 1 m3 Galian tanah biasa sedalam 2 meter. 27,206.00
3 1 m3 Galian tanah biasa sedalam 3 meter. 38,039.00
4 1 m3 Galian tanah keras sedalam 1 meter. 32,341.00
5 1 m3 Galian tanah cadas sedalam 1 meter. 64,750.00
6 1 m3 Galian tanah lumpur sedalam 1 meter. 42,679.00
7 1 m2 Pekerjaan stripping setinggi 1 meter. 2,590.00
8 1 m3 Pembuangan tanah sejauh 150 meter. 26,620.00
9 1 m3 Urugan kembali. 9,932.00
10 1 m3 Pemadatan Tanah. 25,900.00
11 1 m3 Urugan pasir. 79,700.00
12 1 m3 Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL. 166,417.60
13 1 m3 Lapisan pudel campuran 1 Kp: 5 TL. 197,755.50
14 1 m3 Pemasangan lapisan ijuk. 13,770.00
15 1 m3 Urugan sirtu. 120,950.00
16 1 m3 Pekerjaan Urugan tanah dan pemadatan 71,930.00
17 1 m2 Pembuatan jalan proyek/sementara, tebal 25 cm. 102,680.00

III. PEKERJAAN PONDASI


1 1 m3 Pasang pondasi batu kali, 1 Pc : 1 Ps 881,930.00
2 1 m3 Pasang pondasi batu kali, 1 Pc : 2 Ps. 714,240.00
3 1 m3 Pasang pondasi batu kali, 1 Pc : 2,5 Ps. 646,440.00

1
1 3 4 5
4 1 m3 Pasang pondasi batu kali, 1 Pc : 3 Ps 626,950.00
5 1 m3 Pasang pondasi batu kali, 1 Pc : 4 Ps. 574,600.00
6 1 m3 Pasang pondasi batu kali, 1 Pc : 5 Ps. 538,330.00
7 1 m3 Pasang pondasi batu kali, 1 Pc : 6 Ps. 512,820.00
8 1 m3 Pasang pondasi batu kali, 1 Pc : 8 Ps. 475,120.00
9 1 m3 Pasang pondasi batu kali, 1 Kp : 1 Sm : 1 Ps. 468,316.60
10 1 m3 Pasang pondasi batu kali, 1 Kp : 1 SM : 2 Ps. 411,068.00
11 1 m3 Pasang pondasi batu kali, 1 Pc : ¼ Kp : 4 Ps. 586,094.80
12 1 m3 Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps. 487,490.80
13 1 m3 Pasang pondasi batu kali, ¼ Pc : 1 Kp : 4 Ps. 455,228.40
14 1 m3 Pasang pondasi batu kosong 258,994.50
15 1 m3 Pasang pondasi siklop 40% batu kali 1,481,507.50
16 1 m3 Pasang pondasi sumuran diameter 100 Cm. 813,265.00
17 1 m' Pembuatan tiang pancang (40 X 40) Cm, beton bertulang 921,491.90
18 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang 643,533.60

IV. PEKERJAAN DINDING


1 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps 227,963.50
2 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps. 200,715.00
3 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps 186,737.50
4 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps 177,697.50
5 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps 172,470.00
6 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps 169,505.00
7 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps 165,757.00
8 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 1 Ps 107,465.00
9 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 2 Ps 95,832.50
10 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps 89,431.50
11 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 4 Ps 85,630.00
12 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 5 P 83,231.00
13 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 6 Ps 81,739.00
14 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 8 Ps 79,220.00
15 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Kp : 10 Ps 82,866.00
16 1 m2 Pasangan bata merah tebal ½ bata, 1 Kp : 1 Sm : 1 Ps 75,952.20
17 1 m2 Pasangan bata merah tebal ½ bata, 1 Kp : 1 Sm : 2 Ps 74,930.60
18 1 m2 Pasangan bataco 1 Pc : 3 Psr 79,322.50

V. PEKERJAAN PLESTERAN
1 1 m2 Plesteran 1 Pc : 1 Ps, tebal 15 mm. 39,536.50
2 1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm. 33,636.50
3 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm. 30,918.50
4 1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm. 29,182.50
5 1 m2 Plesteran 1 Pc : 5 Ps, tebal 15 mm. 28,146.50
6 1 m2 Plesteran 1 Pc : 6 Ps, tebal 15 mm. 27,338.50
7 1 m2 Plesteran 1 Pc : 8 Ps, tebal 15 mm. 26,298.50
8 1 m2 Plesteran 1 Pc : 0,5 Kp : 3 Ps, tebal 15 mm. 30,463.70
9 1 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm. 26,208.90
10 1 m2 Plesteran 0,5 Pc : 1 Kp : 4 Ps, tebal 15 mm. 28,054.50
11 1 m2 Plesteran 1 Kp : 1 Sm : 1 Ps, tebal 15 mm. 25,321.10
12 1 m2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm. 24,930.30
13 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm. 48,316.00
14 1 m2 Plesteran 1 Pc : 3 Ps, tebal 20 mm. 43,630.00
15 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm. 40,796.00

2
1 3 4 5
16 1 m2 . Plesteran 1 Pc : 5 Ps, tebal 20 mm 38,780.50
17 1 m2 Plesteran 1 Pc : 6 Ps, tebal 20 mm. 37,498.00
18 1 m2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mm. 32,008.60
19 1 m2 Plesteran 1 Pc : 2 Ps, tebal 25 mm. 51,169.00
20 1 m2 Plesteran 1 Pc : 3 Ps, tebal 25 mm. 48,371.50
21 1 m2 Plesteran 1 Pc : 4 Ps, tebal 25 mm. 45,440.00
22 1 m2 Plesteran 1 Pc : 5 Ps, tebal 25 mm. 43,327.00
23 1 m2 Plesteran 1 Pc : 2 Ps, tebal 30 mm. 59,725.00
24 1 m2 Plesteran 1 Pc : 3 Ps, tebal 30 mm. 56,555.00
25 1 m2 Plesteran 1 Pc : 4 Ps, tebal 30 mm. 52,898.50
26 1 m2 Plesteran 1 Pc : 5 Ps, tebal 30 mm. 48,633.00
27 1 m2 Berapen 1 Pc : 3 Ps, tebal 30 mm. 24,528.00
28 1 m2 Berapen 1 Pc : 5 Ps, tebal 15 mm. 22,738.00
29 1 m2 Plesteran Beton 1 Pc : 2 Ps, tebal 15 mm. 40,979.00
30 1 m2 Plesteran Beton 1 Pc : 3 Ps, tebal 15 mm. 38,105.50
31 1 m2 Plesteran Skoning 1 Pc : 2 Ps. 8,226.00
32 1 m2 Plesteran Ciprat. 1 Pc : 2 Ps 26,829.00
33 1 m2 Plesteran siar adukan 1 pc : 2 ps 19,940.50
34 1 m' Benangan / Tali Air / Sudut Kol kolan 1 pc : 3 ps 6,962.50

VI. PEKERJAAN KAYU


1 1 m3 Pasang kusen pintu dan jendela kayu jati eks Bojonegoro 27,065,490.00
2 1 m3 Pasang kusen pintu dan jendela kayu jati 22,685,400.00
3 1 m3 Pasang kusen pintu dan jendela kayu kamper. 13,690,400.00
4 1 m3 Pasang kusen pintu dan jendela kayu balau 12,970,400.00
5 1 m3 Pasang kusen pintu dan jendela kayu kempas 10,810,400.00
6 1 m3 Pasang kusen pintu dan jendela kayu kruing 10,810,400.00
7 1 m3 Pasang kusen pintu dan jendela kayu Meranti 7,930,400.00
8 1 m3 Pasang kusen pintu dan jendela kayu Akasia 6,490,400.00
9 1 m2 Pasang pintu klamp kayu kamper 469,911.50
10 1 m2 Pasang pintu klamp kayu balau 448,311.50
11 1 m2 Pasang pintu panel kayu jati eks Bojonegoro 1,444,139.00
12 1 m2 Pasang pintu panel kayu jati 999,775.00
13 1 m2 Pasang pintu panel kayu kanfer 635,775.00
14 1 m2 Pasang pintu panel kayu balau 611,775.00
15 1 m2 Pasang pintu panel kayu Kruing 539,775.00
16 1 m2 Pasang pintu panel kayu Kempas 539,775.00
17 1 m2 Pasang pintu panel kayu Meranti 443,775.00
18 1 m2 Pasang pintu panel kayu Akasia 387,775.00
19 1 m2 Pasang pintu dan jendela kaca kayu jati eks Bojonegoro 1,273,958.50
20 1 m2 Pasang pintu dan jendela kaca kayu jati 885,140.00
21 1 m2 Pasang pintu dan jendela kaca kayu kamper 566,640.00
22 1 m2 Pasang pintu dan jendela kaca kayu balau 545,640.00
23 1 m2 Pasang pintu dan jendela kaca kayu kempas 482,640.00
24 1 m2 Pasang pintu dan jendela kaca kayu kruing 482,640.00
25 1 m2 Pasang pintu dan jendela kaca kayu meranti 398,640.00
26 1 m2 Pasang pintu dan jendela kaca kayu Akasia 349,640.00
27 1 m2 Pasang pintu dan jendela jalusi kayu jati eks Bojonegoro 2,234,832.40
28 1 m2 Pasang pintu dan jendela jalusi kayu jati 1,523,850.00
29 1 m2 Pasang pintu dan jendela jalusi kayu kamper 955,050.00
30 1 m2 Pasang pintu dan jendela jalusi kayu balau 916,650.00
31 1 m2 Pasang pintu dan jendela jalusi kayu kruing 801,450.00

3
1 3 4 5
32 1 m2 Pasang pintu dan jendela jalusi kayu kempas 801,450.00
33 1 m2 Pasang pintu dan jendela jalusi kayu meranti 647,850.00
34 1 m2 Pasang pintu dan jendela jalusi kayu Akasia 558,250.00
35 1 m2 Pasang jalusi mati kusen kayu jati eks Bojonegoro 2,008,646.00
36 1 m2 Pasang jalusi mati kusen kayu jati 1,342,100.00
37 1 m2 Pasang jalusi mati kusen kayu kanfer 796,100.00
38 1 m2 Pasang jalusi mati kusen kayu balau 760,100.00
39 1 m2 Pasang jalusi mati kusen kayu kempas 652,100.00
40 1 m2 Pasang jalusi mati kusen kayu kruing 652,100.00
41 1 m2 Pasang jalusi mati kusen kayu meranti 508,100.00
42 1 m2 Pasang jalusi mati kusen kayu Akasia 424,100.00
43 1 m2 Pasang pintu plywood rangkap, rangka kayu jati 610,800.00
44 1 m2 Pasang pintu plywood rangkap, rangka kayu kamper 432,440.00
45 1 m2 Pasang pintu plywood rangkap, rangka kayu balau 420,680.00
46 1 m2 Pasang pintu plywood rangkap, rangka kayu kempas 385,400.00
47 1 m2 Pasang pintu plywood rangkap, rangka kayu kruing 385,400.00
48 1 m2 Pasang pintu plywood rangkap, rangka kayu meranti 338,360.00
49 1 m2 Pasang pintu plywood rangkap, rangka kayu akasia 310,920.00
50 1 m2 Pasang pintu teakwood rangkap, rangka kayu jati 651,720.00
51 1 m2 Pasang pintu teakwood rangkap, rangka kayu kamper 473,360.00
52 1 m2 Pasang pintu teakwood rangkap, rangka kayu balau 461,600.00
53 1 m2 Pasang pintu teakwood rangkap, rangka kayu kempas 426,320.00
54 1 m2 Pasang pintu teakwood rangkap, rangka kayu kruing 426,320.00
55 1 m2 Pasang pintu teakwood rangkap, rangka kayu Akasia 351,840.00
56 1 m2 Pasang pintu plywood & formika, rangka kayu jati 785,925.00
57 1 m2 Pasang pintu plywood & formika rangka kayu kamper 607,565.00
58 1 m2 Pasang pintu plywood & formika rangka kayu balau 595,805.00
59 1 m2 Pasang pintu plywood & formika rangka kayu kempas 560,525.00
60 1 m2 Pasang pintu plywood & formika rangka kayu kruing 560,525.00
61 1 m2 Pasang pintu plywood & formika rangka kayu meranti 513,485.00
62 1 m2 Pasang pintu plywood & formika rangka kayu akasia 486,045.00
63 1 m2 Pasang pintu teakwood & formika rangka kayu jati ( divernis ) 789,425.00
64 1 m2 Pasang pintu teakwood & formika rangka kayu kamper ( divernis ) 611,065.00
65 1 m2 Pasang pintu teakwood & formika rangka kayu balau ( divernis ) 599,305.00
66 1 m2 Pasang pintu teakwood & formika rangka kayu kempas ( divernis ) 564,025.00
67 1 m2 Pasang pintu teakwood & formika rangka kayu kruing ( divernis ) 564,025.00
68 1 m2 Pasang pintu teakwood & formika rangka kayu meranti ( divernis ) 516,985.00
69 1 m2 Pasang pintu teakwood & formika rangka kayu akasia ( divernis ) 489,545.00
70 1 m2 Pasang pintu formika double, rangka kayu jati 966,730.00
71 1 m2 Pasang pintu formika double, rangka kayu kamper 788,370.00
72 1 m2 Pasang pintu formika double, rangka kayu balau 776,610.00
73 1 m2 Pasang pintu formika double, rangka kayu kempas 741,330.00
74 1 m2 Pasang pintu formika double, rangka kayu kruing 741,330.00
75 1 m2 Pasang pintu formika double, rangka kayu meranti 694,290.00
76 1 m2 Pasang pintu formika double, rangka kayu akasia 666,850.00
77 1 m3 Pasang konstruksi kuda-kuda kayu jati 22,337,400.00
78 1 m3 Pasang konstruksi kuda-kuda kayu kamper 12,437,400.00
79 1 m3 Pasang konstruksi kuda-kuda kayu balau 11,777,400.00
80 1 m3 Pasang konstruksi kuda-kuda kayu kempas 9,797,400.00
81 1 m3 Pasang konstruksi kuda-kuda kayu kruing 9,797,400.00
82 1 m3 Pasang konstruksi kuda-kuda kayu Akasia 5,837,400.00
83 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu jati 21,989,160.00

4
1 3 4 5
84 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu kanfer 12,089,160.00
85 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Balau 11,429,160.00
86 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Kempas 9,449,160.00
87 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Kruing 9,449,160.00
88 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Meranti 6,809,160.00
89 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Akasia 5,489,160.00
90 1 m2 Pasang kaso + reng genteng kodok kayu jati 244,015.00
91 1 m2 Pasang kaso + reng genteng kodok kayu kamper 136,015.00
92 1 m2 Pasang kaso + reng genteng kodok kayu balau 128,815.00
93 1 m2 Pasang kaso + reng genteng kodok kayu kempas 107,215.00
94 1 m2 Pasang kaso + reng genteng kodok kayu kruing 107,215.00
95 1 m2 Pasang kaso + reng genteng kodok kayu meranti 78,415.00
96 1 m2 Pasang kaso + reng genteng kodok kayu Akasia 64,015.00
97 1 m2 Pasang kaso + reng genteng MKP lokal kayu jati 244,015.00
98 1 m2 Pasang kaso + reng genteng MKP lokal kayu kamper 136,015.00
99 1 m2 Pasang kaso + reng genteng MKP lokal kayu balau 128,815.00
100 1 m2 Pasang kaso + reng genteng MKP lokal kayu kempas 107,215.00
101 1 m2 Pasang kaso + reng genteng MKP lokal kayu kruing 107,215.00
102 1 m2 Pasang kaso + reng genteng MKP lokal kayu meranti 78,415.00
103 1 m2 Pasang kaso + reng genteng MKP lokal kayu Akasia 64,015.00
104 1 m2 Pasang kaso + reng genteng monier kayu jati 282,415.00
105 1 m2 Pasang kaso + reng genteng monier kayu kamper 156,415.00
106 1 m2 Pasang kaso + reng genteng monier kayu balau 148,015.00
107 1 m2 Pasang kaso + reng genteng monier kayu kempas 122,815.00
108 1 m2 Pasang kaso + reng genteng monier kayu kruing 122,815.00
109 1 m2 Pasang kaso + reng genteng monier kayu meranti 89,215.00
110 1 m2 Pasang kaso + reng genteng monier kayu Akasia 72,415.00
111 1 m2 Pasang kaso + reng genteng beton kayu jati 282,415.00
112 1 m2 Pasang kaso + reng genteng beton kayu kanfer 156,415.00
113 1 m2 Pasang kaso + reng genteng beton kayu balau 148,015.00
114 1 m2 Pasang kaso + reng genteng beton kayu kempas 122,815.00
115 1 m2 Pasang kaso + reng genteng beton kayu kruing 122,815.00
116 1 m2 Pasang kaso + reng genteng beton kayu meranti 89,215.00
117 1 m2 Pasang kaso + reng genteng beton kayu Akasia 72,415.00
118 1 m2 Pasang kaso + reng atap sirap kayu jati 3,184,658.00
119 1 m2 Pasang kaso + reng atap sirap kayu kamper 1,699,658.00
120 1 m2 Pasang kaso + reng atap sirap kayu balau 1,600,658.00
121 1 m2 Pasang kaso + reng atap sirap kayu kempas 1,303,658.00
122 1 m2 Pasang kaso + reng atap sirap kayu kruing 1,303,658.00
123 1 m2 Pasang kaso + reng atap sirap kayu meranti 907,658.00
124 1 m2 Pasang kaso + reng atap sirap kayu Akasia 709,658.00
125 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu jati 259,787.50
126 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kamper 151,787.50
127 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu balau 144,587.50
128 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kempas 122,987.50
129 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kruing 122,987.50
130 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu meranti 94,187.50
131 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu Akasia 79,787.50
132 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu jati 472,805.00
133 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kamper 265,805.00
134 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu balau 252,005.00
135 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kempas 210,605.00

5
1 3 4 5
136 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kruing 210,605.00
137 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu meranti 155,405.00
138 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu Akasia 127,805.00
139 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu jati 556,012.50
140 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kamper 313,012.50
141 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu balau 296,812.50
142 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kempas 248,212.50
143 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kruing 248,212.50
144 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu meranti 183,412.50
145 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu Akasia 151,012.50
146 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu jati. 161,262.50
147 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kamper 95,430.00
148 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu balau 91,422.50
149 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kempas 78,150.00
150 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kruing 78,462.50
151 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu meranti 60,870.00
152 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu Akasia 50,790.00
153 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu jati 237,915.00
154 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kamper 137,815.00
155 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu balau 131,215.00
156 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kempas 111,415.00
157 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kruing 111,415.00
158 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu meranti 85,015.00
159 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu Akasia 69,615.00
160 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu jati 315,847.50
161 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kamper 183,897.50
162 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu balau 175,197.50
163 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kempas 149,097.50
164 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kruing 149,097.50
165 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu meranti 114,297.50
166 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu Akasia 93,997.50
167 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu jati 185,515.00
168 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kanfer 107,255.00
169 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu balau 102,095.00
170 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kempas 86,615.00
171 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kruing 86,615.00
172 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu meranti 65,975.00
173 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu Akasia 53,935.00
174 1 m2 Pasang rangka dinding pemisah kayu jati 555,137.50
175 1 m2 Pasang rangka dinding pemisah kayu kanfer 315,937.50
176 1 m2 Pasang rangka dinding pemisah kayu balau 300,037.50
177 1 m2 Pasang rangka dinding pemisah kayu kempas 252,337.50
178 1 m2 Pasang rangka dinding pemisah kayu kruing 252,337.50
179 1 m2 Pasang rangka dinding pemisah kayu meranti 188,737.50
180 1 m2 Pasang rangka dinding pemisah kayu tahun / akasia 155,537.50
181 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu jati 667,690.00
182 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kamper 391,890.00
183 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu balau 412,590.00
184 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kempas 364,890.00
185 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kruing 364,890.00
186 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu meranti 301,290.00
187 1 m2 Pasang dinding pemisah plywood rangkap, rangka Akasia 268,090.00

6
1 3 4 5
188 1 m2 Pasang dinding lambriziring dari papan jati 284,080.00
189 1 m2 Pasang dinding lambriziring dari papan kanfer 220,380.00
190 1 m2 Pasang dinding lambriziring dari papan balau 216,180.00
191 1 m2 Pasang dinding lambriziring dari papan kempas 203,580.00
192 1 m2 Pasang dinding lambriziring dari papan kruing 203,580.00
193 1 m2 Pasang dinding lambriziring dari papan meranti 186,780.00
194 1 m2 Pasang dinding lambriziring dari papan akasia 176,980.00
195 1 m2 Pasang plywood tebal 4 mm, untuk dinding 31,754.65
196 1 m’ Pasang list plafond -kayu profil 8,951.50

VII. PEKERJAAN BETON


1 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 5 Kr 674,227.50
2 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 6 Kr 653,877.50
3 1 m3 Membuat beton tumbuk 1 Pc : 4 Ps : 6 Kr 614,977.50
4 1 m3 Membuat beton tumbuk 1 Pc : 2 Ps : 3 Kr. 673,827.50
5 1 m2 Membuat lantai kerja beton tumbuk 1 Pc : 3 Ps : 5 Kr, tebal 5 cm 81,173.00
6 1 m3 Membuat beton dengan mutu K 225 1,144,250.00
7 1 m3 Membuat beton dengan mutu K 275 1,170,750.00
8 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 4 Kr. 762,627.50
9 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 2,5 Kr. 834,227.50
10 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 3 Kr. 787,877.50
11 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 2,5 Kr. 891,127.50
12 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 2 Kr. 1,004,777.50
13 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr. 918,612.50
14 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 4 split 872,562.50
15 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 3 split 967,662.50
16 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 2,5 split 1,001,912.50
17 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 1 Kr. 1,254,062.50
18 1 Kg Pembesian dengan besi polos atau besi ulir 12,577.65
19 1 m2 Pasang bekisting untuk pondasi 135,665.00
20 1 m2 Pasang bekisting untuk sloof 148,165.00
21 1 m2 Pasang bekisting untuk kolom 257,945.50
22 1 m2 Pasang bekisting untuk balok 266,345.50
23 1 m2 Pasang bekisting untuk lantai 322,845.50
24 1 m2 Pasang bekisting untuk tangga 233,620.50
25 1 m2 Pasang jembatan cor 96,513.50
26 1 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting). 3,265,182.50
27 1 m3 Membuat sloof beton bertulang (200 kg besi + bekisting). 4,109,872.50
28 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting). 7,025,700.00
29 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting). 5,365,756.50
30 1 m3 Membuat balok beton bertulang (150 kg besi + bekisting). 4,978,380.00
31 1 m3 Membuat dinding beton bertulang (150 kg besi + bekisting). 4,731,474.00
32 1 m3 Membuat tangga beton bertulang (200 kg besi + bekisting). 4,978,173.50
33 1 m’ Membuat kolom penguat beton bertulang (11 x 11) cm. 60,859.00
34 1 m’ Membuat ring balok beton bertulang (10 x 15) cm. 71,902.50
35 1 m2 Membuat Bekisting 147,715.00
36 1 m3 Membongkar bekisting dan perawatan beton 180,000.00

VIII. PEKERJAAN PENUTUP ATAP


1 1 m2 Pasang atap genteng press biasa 44,606.50
2 1 m2 Pasang atap genteng MKP lokal 49,606.50
3 1 m2 Pasang atap genteng Mantili 47,306.50

7
1 3 4 5
4 1 m’ Pasang bubung genteng MKP Lokal 67,326.00
5 1 m2 Pasang atap asbes gelombang besar (3,00 x 1,05 m) x 4 mm 38,658.50
6 1 m2 Pasang atap asbes gelombang kecil (1,80 x 1,05 m) x 4 mm 36,194.00
7 1 m’ Pasang bubung stel gelombang besar 41,782.00
8 1 m’ Pasang bubung stel gelombang kecil 32,322.00
9 1 m2 Pasang atap genteng beton 57,235.00
10 1 m2 Pasang atap genteng metal 135,943.00
11 1 m2 Pasang atap sirap 142,151.50
12 1 m’ Pasang nok genteng beton 77,510.00
13 1 m’ Pasang nok sirap 63,730.50
14 1 m2 Pasang atap seng gelombang 56,433.00
15 1 m2 Pasang atap nok seng 25,256.50
16 1 m2 Pasang aluminium foil / sisalation 20,876.50

IX. PEKERJAAN LANGIT - LANGIT


1 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 4 mm 16,634.50
2 1 m2 Langit-langit plywood (30 x 60) cm, tebal 4 mm 32,707.00
3 1 m2 Langit-langit teakwood (30 x 60) cm, tebal 4 mm 45,883.00
4 1 m2 Langit-langit gypsum board, tebal 9 mm 35,563.50
5 1 m' List Plafond Gypsum Kecil 21,530.50
6 1 m' List Plafond Gypsum Besar 32,030.50

X. PEKERJAAN SANITASI
1 1 bh Memasang kloset duduk/monoblok 1,240,292.50
2 1 bh Memasang kloset duduk keramik 572,492.50
3 1 bh Memasang kloset jongkok porselen 347,780.00
4 1 bh Memasang kloset jongkok teraso 244,180.00
5 1 bh Memasang urinoir 482,950.00
6 1 bh Memasang wastafel 415,450.00
7 1 bh Memasang bak mandi teraso volume 0,30 m3 324,380.00
8 1 bh Memasang bak mandi Fibreglass volume 0,30 m3 354,180.00
9 1 bh Memasang badkip porselen 1,535,377.15
10 1 bh Memasang bak fibreglass volume 1 m3 air 746,400.00
11 1 m' Memasang pipa beton, diameter 15 cm - 20cm 80,002.90
12 1 m' Memasang pipa beton, diameter 30 cm 127,526.90
13 1 m' Memasang pipa beton, diameter 40 cm 135,776.90
14 1 m' Memasang pipa beton, diameter 50 cm 166,026.90
15 1 m' Memasang pipa beton, diameter 60 cm 171,526.90
16 1 m' Memasang pipa beton, diameter 80 cm 204,526.90
17 1 m' Memasang pipa beton, diameter 100 cm 294,726.90
18 1 bh Memasang bak kontrol pasangan batu bata ukuran (30 x30) cm, tinggi 35 cm 346,644.25
19 1 bh Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm 321,113.00
20 1 bh Memasang bak kontrol pasangan batu bata ukuran (60x60) cm, tinggi 65 cm 478,914.00
21 1 m' Memasang buis beton 1/2 lingkaran dia 20 cm 35,926.45
22 1 m' Memasang buis beton 1/2 lingkaran dia 30 cm 47,476.45
23 1 m' Memasang buis beton 1/2 lingkaran dia 40 cm 49,676.45
24 1 m' Memasang pipa galvanis diameter 1” tebal 0,8 mm 28,603.50
25 1 m' Memasang pipa galvanis diameter 1,5” tebal 0,8 mm 33,253.50
26 1 m' Memasang pipa galvanis diameter 2” tebal 0,8 mm 40,228.50
27 1 m' Memasang pipa galvanis diameter 2,5” tebal 0,8 mm 60,877.20
28 1 m' Memasang pipa galvanis diameter 3” tebal 0,8 mm 94,202.20
29 1 m' Memasang pipa galvanis diameter 4” tebal 0,8 mm 109,702.20

8
1 3 4 5
30 1 m' Memasang pipa GIP BSA diameter ½” 16,203.50
31 1 m' Memasang pipa GIP BSA diameter ¾” 19,303.50
32 1 m' Memasang pipa GIP BSA diameter 1” 22,403.50
33 1 m' Memasang pipa GIP BSA diameter 1½” 32,977.20
34 1 m' Memasang pipa GIP BSA diameter 2” 36,077.20
35 1 m' Memasang pipa GIP BSA diameter 3” 43,827.20
36 1 m' Memasang pipa GIP BSA diameter 4” 53,431.15
37 1 m' Memasang pipa PVC tipe AW diameter ½” 13,472.40
38 1 m' Memasang pipa PVC tipe AW diameter ¾” 15,332.40
39 1 m' Memasang pipa PVC tipe AW diameter 1” 16,804.90
40 1 m' Memasang pipa PVC tipe AW diameter 5” 145,997.40
41 1 m' Memasang pipa PVC tipe AW diameter 2” 35,476.10
42 1 m' Memasang pipa PVC tipe AW diameter 2½ ” 48,967.40
43 1 m' Memasang pipa PVC tipe AW diameter 3 ” 68,330.05
44 1 m' Memasang pipa PVC tipe AW diameter 4 ” 93,905.05
45 1 bh Memasang kran Dupon diameter ½” 165,742.50
46 1 bh Memasang kran Toto diameter ½” 248,742.50
47 1 bh Memasang kran diameter ½” 22,142.50
48 1 bh Memasang kran diameter ¾” 27,542.50
49 1 bh Memasang stop kran diameter ½” 36,142.50
50 1 bh Memasang stop kran diameter ¾” 40,442.50
51 1 bh Memasang stop kran diameter 1” 45,942.50
52 1 bh Memasang Floor drain stainless steel 22,165.00
53 1 bh Memasang Floor drain plastik 16,165.00

XI. PEKERJAAN BESI DAN ALUMINIUM


1 1 Kg Pabrikasi dan pasang Rangka baja 20,340.40
2 1 Kg Pasang rangka atap baja 18,940.40
3 1 m2 Pasang pintu besi baja 1,082,447.50
4 1 m2 Pasang pintu lipat 1,104,541.10
5 1 m2 Pasang Rolling door 540,416.10
6 1 m2 Pasang pintu alluminium 774,541.10
7 1 m2 Pasang kawat harmonika 63,489.00
8 1 m2 Pasang kawat nyamuk 38,409.00
9 1 m2 Pasang jendela nako & tralis 293,330.00
10 1 m` Pasang talang datar, seng bjls 30 112,527.50
11 1 m` Pasang talang miring, seng bjls 30 163,787.50
12 1 m’ Pasang talang ½ lingkaran D-10 cm, seng bjls 30 153,522.50
13 1 m’ Pasang talang ½ lingkaran D-10 cm, seng bjls 20 144,462.50

XII. PEKERJAAN KUNCI DAN KACA


1 1 bh Pasang kunci tanam biasa 90,165.00
2 1 bh Pasang kunci tanam SES ( pelor ) 186,354.00
3 1 bh Pasang kunci tanam SES 251,154.00
4 1 bh Pasang selot rossete dekson 370,154.00
5 1 bh Pasang engsel jendela biasa 16,888.50
6 1 bh Pasang engsel pintu biasa 17,988.50
7 1 bh Pasang engsel stainllesstel dekson 3" 58,288.50
8 1 bh Pasang engsel stainllesstel dekson 4" 106,288.50
9 1 bh Pasang engsel stainllesstel dekson 5" 117,288.50
10 1 bh Pasang grendel pintu panjang 22,388.50
11 1 bh Pasang grendel jendela SES 31,288.50

9
1 3 4 5
12 1 bh Pasang grendel tanam SES 63,088.50
13 1 bh Pasang grendel pintu ganda dekson 40 cm 128,288.50
14 1 bh Pasang hak angin 20,188.50
15 1 bh Pasang hak angin SES 40,288.50
16 1 bh Pasang handel pintu stainlesstel kecil 49,295.00
17 1 bh Pasang handel pintu stainlesstel besar 124,295.00
18 1 bh Pasang handel pintu ganda dekson 30 cm 587,295.00
19 1 bh Pasang handel pintu ganda dekson 40 cm 624,295.00
20 1 bh Pasang rel pintu dorong 286,154.00
21 1 m2 Pasang kaca , tebal 3 mm 68,368.50
22 1 m2 Pasang kaca , tebal 5 mm 69,688.50
23 1 m2 Pasang kaca Ry band , tebal 5 mm 97,408.50
24 1 m2 Pasang kaca patri , tebal 5 mm 2,510,368.50
25 1 m2 Pasang kaca air tbl. 5 mm 104,668.50

XIII. PEKRJAAN PENUTUP LANTAI


1 1 m2 Pasang lantai ubin pc abu-abu ukuran 20x20 cm 67,205.50
2 1 m2 Pasang lantai keramik ukuran 20x20 cm 124,371.60
3 1 m2 Pasang lantai keramik tekstur ukuran 20x20 cm 126,686.00
4 1 m2 Pasang lantai keramik tekstur ukuran 30x30 cm 132,998.00
5 1 m2 Pasang lantai Granit ( ex Granito ) warna terang ukuran 40x40 cm 209,794.00
6 1 m2 Pasang lantai Granit ( ex Granito ) warna gelap ukuran 40x40 cm 222,418.00
7 1 m2 Pasang lantai Granit ( ex Granito ) tektur ukuran 40x40 cm 292,902.00
8 1 m2 Pasang lantai Granit ( ex Granito ) tektur ukuran 60x60 cm 382,322.00
9 1 m2 Pasang lantai Granit ( ex Granito ) warna terang ukuran 60x60 cm 299,214.00
10 1 m2 Pasang lantai Granit ( ex Granito ) warna gelap ukuran 60x60 cm 324,462.00
11 1 m2 Pasang lantai batu lempeng 168,240.00
12 1 m2 Pasang lantai marmer bakar 185,598.00
13 1 m2 Pasang lantai Keramik putih ukuran 40x40 cm 119,322.00
14 1 m2 Pasang lantai Keramik warna ukuran 40x40 cm 127,738.00
15 1 m2 Pasang lantai Keramik putih ukuran 30x30 cm 113,010.00
16 1 m2 Pasang lantai Keramik warna ukuran 30x30 cm 121,426.00
17 1 m2 Pasang lantai marmer 262,394.00
18 1 m2 Pasang lantai granit motif 255,030.00
19 1 m2 Pasang lantai batu candi hitam 192,962.00
20 1 m2 Pasang lantai andesit 30 x 30 cm 241,354.00
21 1 m2 Pasang Paving Stone / conblok Warna Tebal 6 Cm K225 76,050.00
22 1 m2 Pasang Paving Stone / conblok Abu-abu Tebal 6 Cm K225 68,350.00
23 1 m2 Pasang Paving Stone / conblok Warna Tebal 8 Cm K225 81,550.00
24 1 m2 Pasang Paving Stone / conblok Abu-abu Tebal 8 Cm K225 74,730.00
25 1 m2 Pasang Paving Stone / Conblok 5 Warna Uk 10 x 10 cm 88,150.00
26 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm K 300 71,650.00
27 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm K 400 74,950.00
28 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm 54,050.00
29 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 8 cm 56,250.00
30 1 m2 Pasang dinding keramik putih Uk. 20x25 cm 122,832.50
31 1 m2 Pasang dinding keramik motif Uk. 20x25 cm 123,892.50
32 1 m2 Pasang dinding keramik Uk. 20x33 cm 139,792.50
33 1 m2 Pasang dinding keramik cutting Uk. 30x50 cm 181,132.50
34 1 m2 Pasang dinding keramik Cutting Uk. 31x63 cm 252,152.50
35 1 m2 Pasang dinding keramik tekstur Cutting Uk. 31x63 cm 271,232.50
36 1 m2 Pasang dinding batu lempeng 160,115.00

10
1 3 4 5
37 1 m2 Pasang dinding batu andesit alur 274,565.00
38 1 m2 Pasang dinding batu andesit 30 x 30 cm 233,090.00
39 1 m2 Pasang dinding batu candi hitam 184,790.00
40 1 m2 Pasang dinding batu susun sirih 316,040.00
41 1 m2 Pasang dinding batu salagedang 170,615.00
42 1 m2 Pasang dinding batu paras grobongan 160,115.00
43 1 m2 Pasang dinding batu granit motif 246,740.00
44 1 m2 Pasang dinding batu marmo biasa 142,265.00
45 1 m2 Pasang dinding batu marmo warna 167,990.00
46 1 m2 Pasang dinding batu bobos 177,440.00
47 1 m2 Pasang dinding batu warna ( hias ) 157,490.00
48 1 m' Plint kayu 2 x 10 cm 61,008.00
49 1 m2 Lantai Patlag 1 Lapis Bata merah camp. 1 Sm : 1 Kpr : 3 Psr 42,759.80
50 1 m' Plint keramik uk 10 x 20 cm 97,070.00

XIV PEKERJAAN PENGECATAN


1 1 m2 Mengikis/mengerok permukaan cat tembok lama 8,570.00
2 1 m2 Pengecatan bidang kayu lama 27,441.25
3 1 m2 Pengecatan bidang kayu baru (1 lps plamir),1 lps cat dasar, 2 lps cat penutup. 31,112.50
4 1 m2 Pengecatan bidang kayu baru (1 lps plamir), 1 lps cat dasar, 3 lpis cat penutup. 41,007.50
5 1 m2 Pelaburan bidang kayu dengan teak oil 12,050.00
6 1 m2 Pelaburan bidang kayu dengan politur 31,344.00
7 1 m2 Pelaburan bidang kayu dengan cat residu dan ter 6,833.00
8 1 m2 Pelaburan bidang kayu dengan vernis 23,620.00
9 1 m2 Pengecatan tembok baru (1 lapis plamir,1 lapis cat dasar, 2 lapis cat penutup) 13,216.25
10 1 m2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) 10,107.50
11 1 m2 Pegecatan permukaan baja dengan meni besi 15,940.00
12 1 m2 Pegecatan permukaan baja dengan meni besi dan perancah 32,713.75
13 1 m2 Pengecatan Plafond lama (1 lapis cat dasar, 2 lapis cat penutup) 12,634.38
14 1 m2 Pengecatan Plafond baru (1 lapis plamir,1 lapis cat dasar, 2 lapis cat penutup) 16,520.31
15 1 m2 Couttting ( Glasur batu alam ) 30,186.50
16 1 m2 Pengecatan genteng ( 1 lapis cat dasar, 2 lapis cat penutup) 20,307.50
17 1 m2 Pengecatan tembok interior premium 27,256.25
18 1 m2 Pengecatan tembok eksterior weathershield 34,096.25
19 1 m2 Pengecatan Permukaan Baja lapis seng secara manual sistem 1 lapis dengan tebal 200 um 17,478.00
20 1 m2 Pengecatan Permukaan Baja lapis seng secara semprot sistem 1 lapis dengan tebal 200 um 96,950.00

11
STANDAR NASIONAL INDONESIA BANGUNAN GEDUNG DAN PERUMAHAN
ANALISA BIAYA KONSTRUKSI ( ABK ) TAHUN 2013 TRIWULAN 1

PROPINSI : JAWA TIMUR


KABUPATEN : TULUNGAGUNG
SISTEM : KONTRAK
HARGA : ATAS

HARGA JUMLAH HARGA


NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)

I. PEKERJAAN PERSIAPAN

1 1 m` Pagar sementara dari kayu tinggi 2 meter.


Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.25000 Btg 150,000.00 187,500.00
PC / Portland cement 2.50000 Kg 1,450.00 3,625.00
Pasir pasang / beton 0.00500 M3 200,000.00 1,000.00
Batu pecah 2-3 cm 0.00900 M3 260,000.00 2,340.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.07200 M3 4,250,000.00 306,000.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Residu ( Ter ) 0.40000 Lt 5,500.00 2,200.00
Tenaga
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.02000 Oh 68,000.00 1,360.00
32,110.00 503,625.00
2 1 m` Pagar sementara dari seng gelombang tinggi 2 meter.
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.25000 Btg 150,000.00 187,500.00
PC / Portland cement 2.50000 Kg 1,450.00 3,625.00
Seng Gelombang Bjls 20 uk. 180 x 90 x 0,02 cm 1.20000 Lbr 47,000.00 56,400.00
Pasir pasang / beton 0.00500 M3 200,000.00 1,000.00
Batu pecah 2-3 cm 0.00900 M3 260,000.00 2,340.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.07200 M3 4,250,000.00 306,000.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Cat Meny besi 0.45000 Kg 15,000.00 6,750.00
Tenaga
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.02000 Oh 68,000.00 1,360.00
32,110.00 564,575.00
3 1 m` Pagar sementara dari kawat duri tinggi 1,8 meter
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.00000 Btg 150,000.00 150,000.00
PC / Portland cement 2.00000 Kg 1,450.00 2,900.00
Kawat Duri 25.00000 Kg 1,800.00 45,000.00
Pasir pasang / beton 0.00500 M3 200,000.00 1,000.00
Batu pecah 2-3 cm 0.00900 M3 260,000.00 2,340.00

1
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.02000 Oh 68,000.00 1,360.00
27,610.00 202,200.00
4 1 m` Pengukuran dan pemasangan bouwplank
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01200 M3 4,250,000.00 51,000.00
Paku biasa 0.02000 Kg 16,000.00 320.00
Kayu Tahun papan ( Mauni/akasia) 0.00700 M3 4,545,500.00 31,818.50
Tenaga
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 83,138.50
5 1 m2 Pembuatan kantor sementara, dengan lantai plesteran
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.25000 Btg 150,000.00 187,500.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.18000 M3 4,250,000.00 765,000.00
Paku biasa 0.85000 Kg 16,000.00 13,600.00
Besi plat 1.00000 Kg 12,000.00 12,000.00
PC / Portland cement 35.00000 Kg 1,450.00 50,750.00
Pasir pasang / beton 0.15000 M3 200,000.00 30,000.00
Pasir pasang / beton 0.10000 M3 200,000.00 20,000.00
Batu pecah 2-3 cm 0.15000 M3 260,000.00 39,000.00
Batu Bata / Merah 30.00000 Bh 700.00 21,000.00
Seng Plat BJLS 30 lebar 0,90 m 0.25000 Lbr 42,000.00 10,500.00
Naco (Kerangka dan Daun ) 2.00000 Bh 250,000.00 500,000.00
Kaca Bening Uk. 3 mm 0.08000 M2 53,000.00 4,240.00
Slot ( Kunci-kunci pintu ) lokal 0.15000 Bh 65,000.00 9,750.00
Multiplek 6 mm, uk 1,20 x 2,40 m 0.06000 Lmb 100,000.00 6,000.00
Tenaga
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Tukang batu 1.00000 Oh 57,500.00 57,500.00
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.05000 Oh 68,000.00 3,400.00
284,650.00 1,669,340.00
6 1 m2 Pembuatan gudang semen dan alat-alat
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.70000 Btg 150,000.00 255,000.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.21000 M3 4,250,000.00 892,500.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
PC / Portland cement 10.50000 Kg 1,450.00 15,225.00
Pasir pasang / beton 0.03000 M3 200,000.00 6,000.00
Batu pecah 2-3 cm 0.05000 M3 260,000.00 13,000.00

2
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Seng Gelombang Bjls 20 uk. 180 x 90 x 0,02 cm 1.50000 Lbr 47,000.00 70,500.00
Tenaga
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.05000 Oh 68,000.00 3,400.00
175,900.00 1,257,025.00
7 1 m2 Pembuatan rumah jaga/konstruksi kayu
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 3.00000 Btg 150,000.00 450,000.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.27600 M3 4,250,000.00 1,173,000.00
Paku biasa 0.70000 Kg 16,000.00 11,200.00
Seng Gelombang Bjls 20 uk. 180 x 90 x 0,02 cm 1.50000 Lbr 47,000.00 70,500.00
Tenaga
Tukang kayu 1.50000 Oh 57,500.00 86,250.00
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Kepala Tukang 0.15000 Oh 62,500.00 9,375.00
Mandor 0.05000 Oh 68,000.00 3,400.00
144,025.00 1,704,700.00
8 1 m2 Membersihkan lapangan dan perataan
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Mandor 0.05000 Oh 68,000.00 3,400.00
7,900.00 -
9 1 m2 Pembuatan bedeng buruh
Bahan
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m 1.25000 Btg 150,000.00 187,500.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.18600 M3 4,250,000.00 790,500.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
PC / Portland cement 18.00000 Kg 1,450.00 26,100.00
Pasir pasang / beton 0.03000 M3 200,000.00 6,000.00
Batu pecah 2-3 cm 0.05000 M3 260,000.00 13,000.00
Seng Gelombang Bjls 20 uk. 180 x 90 x 0,02 cm 1.50000 Lbr 47,000.00 70,500.00
Multiplek 6 mm, uk 1,20 x 2,40 m 1.35000 Lbr 100,000.00 135,000.00
Tenaga
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.05000 Oh 68,000.00 3,400.00
175,900.00 1,233,400.00
10 1 m2 Pembuatan bak adukan ukuran (40 x 50 x 20) cm
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.03600 M3 4,545,500.00 163,638.00
Paku biasa 0.08000 Kg 16,000.00 1,280.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.02100 m3 4,250,000.00 89,250.00
Tenaga
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Mandor 0.00150 Oh 68,000.00 102.00
17,352.00 254,168.00

3
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
11 1 m2 Pembuatan Stegger dari bambu ukuran (40 x 50 x 20) cm
Bahan
Bambu dia 6 - 8 cm, panjang 6 m 1.00000 Btg 12,500.00 12,500.00
Tali ijuk 0.25000 Kg 9,100.00 2,275.00
Tenaga
Tukang kayu 0.01700 Oh 57,500.00 977.50
Kepala Tukang 0.00200 Oh 62,500.00 125.00
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Mandor 0.01300 Oh 68,000.00 884.00
13,236.50 14,775.00
12 1 m2 Pembuatan jalan sementara/menuju bedeng
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 0.15000 M3 165,000.00 24,750.00
Batu pecah 5-7 cm 0.09000 M3 185,000.00 16,650.00
Pasir pasang / beton 0.01000 M3 200,000.00 2,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Mandor 0.05000 Oh 68,000.00 3,400.00
48,400.00 43,400.00
13 1 m3 Bongkaran beton bertulang
Tenaga
Pekerja / Buruh tak terlatih 6.66700 Oh 45,000.00 300,015.00
Mandor 0.33300 Oh 68,000.00 22,644.00
322,659.00 -
14 1 m3 Bongkaran dinding tembok bata merah
Tenaga
Pekerja / Buruh tak terlatih 6.66700 Oh 45,000.00 300,015.00
Mandor 0.03300 Oh 68,000.00 2,244.00
302,259.00 -
15 1 m’ Pasang pagar kawat jaring galvanis, tinggi 1,00 m
Bahan
Kawat Duri 0.43400 Lbr 1,800.00 781.20
Tenaga
Pekerja / Buruh tak terlatih 0.04200 Oh 45,000.00 1,890.00
Kepala Tukang 0.00400 Oh 62,500.00 250.00
Tukang kayu 0.04200 Oh 57,500.00 2,415.00
Mandor 0.00200 Oh 68,000.00 136.00
4,691.00 781.20
II. PEKERJAAN TANAH

1 1 m3 Galian tanah biasa sedalam 1 meter.


Tenaga
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Mandor 0.04000 Oh 68,000.00 2,720.00
20,720.00 -
2 1 m3 Galian tanah biasa sedalam 2 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.52600 Oh 45,000.00 23,670.00
Mandor 0.05200 Oh 68,000.00 3,536.00

4
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
27,206.00 -
3 1 m3 Galian tanah biasa sedalam 3 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.73500 Oh 45,000.00 33,075.00
Mandor 0.07300 Oh 68,000.00 4,964.00
38,039.00 -
4 1 m3 Galian tanah keras sedalam 1 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.62500 Oh 45,000.00 28,125.00
Mandor 0.06200 Oh 68,000.00 4,216.00
32,341.00 -
5 1 m3 Galian tanah cadas sedalam 1 meter.
Tenaga
Pekerja / Buruh tak terlatih 1.25000 Oh 45,000.00 56,250.00
Mandor 0.12500 Oh 68,000.00 8,500.00
64,750.00 -
6 1 m3 Galian tanah lumpur sedalam 1 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.82300 Oh 45,000.00 37,035.00
Mandor 0.08300 Oh 68,000.00 5,644.00
42,679.00 -
7 1 m2 Pekerjaan stripping setinggi 1 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Mandor 0.00500 Oh 68,000.00 340.00
2,590.00 -
8 1 m3 Pembuangan tanah sejauh 150 meter.
Tenaga
Pekerja / Buruh tak terlatih 0.51600 Oh 45,000.00 23,220.00
Mandor 0.05000 Oh 68,000.00 3,400.00
26,620.00 -
9 1 m3 Urugan kembali.
Tenaga
Pekerja / Buruh tak terlatih 0.19200 Oh 45,000.00 8,640.00
Mandor 0.01900 Oh 68,000.00 1,292.00
9,932.00 -
10 1 m3 Pemadatan Tanah.
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Mandor 0.05000 Oh 68,000.00 3,400.00
25,900.00 -
11 1 m3 Urugan pasir.
Bahan
Pasir Urug 1.20000 M3 77,300.00 92,760.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Mandor 0.01000 Oh 68,000.00 680.00
14,180.00 92,760.00
12 1 m3 Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL.

5
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
Pasir Urug 0.33000 M3 77,300.00 25,509.00
Kapur Batu 0.10900 M3 545,500.00 59,459.50
Tanah liat 0.76300 M3 50,000.00 38,150.00
Tenaga
Pekerja / Buruh tak terlatih 0.83300 Oh 45,000.00 37,485.00
Tukang batu 0.41600 Oh 57,500.00 23,920.00
Kepala Tukang 0.04000 Oh 62,500.00 2,500.00
Mandor 0.08300 Oh 68,000.00 5,644.00
69,549.00 123,118.50
13 1 m3 Lapisan pudel campuran 1 Kp: 5 TL.
Bahan
Kapur Batu 0.20000 M3 545,500.00 109,100.00
Tanah liat 1.00000 M3 50,000.00 50,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.83300 Oh 45,000.00 37,485.00
Tukang batu 0.41600 Oh 57,500.00 23,920.00
Kepala Tukang 0.04100 Oh 62,500.00 2,562.50
Mandor 0.08100 Oh 68,000.00 5,508.00
69,475.50 159,100.00
14 1 m3 Pemasangan lapisan ijuk.
Bahan
Ijuk 1.20000 M3 5,500.00 6,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Mandor 0.01500 Oh 68,000.00 1,020.00
7,770.00 6,600.00
15 1 m3 Urugan sirtu.
Bahan
Sirtu Urug 1.20000 M3 155,000.00 186,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Mandor 0.02500 Oh 68,000.00 1,700.00
12,950.00 186,000.00
16 1 m3 Pekerjaan Urugan tanah dan pemadatan
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Mandor 0.01000 Oh 68,000.00 680.00
Bahan :
Tanah urug 1.20000 M3 50,000.00 60,000.00
11,930.00 60,000.00
17 1 m2 Pembuatan jalan proyek/sementara, tebal 25 cm.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 0.27500 M3 165,000.00 45,375.00
Batu pecah 2-3 cm 0.03000 M3 260,000.00 7,800.00
Pasir Urug 0.05000 M3 77,300.00 3,865.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Mandor 0.10000 Oh 68,000.00 6,800.00

6
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
51,800.00 57,040.00

III. PEKERJAAN PONDASI

1 1 m3 Pasang pondasi batu kali, 1 Pc : 1 Ps


Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
PC / Portland cement 392.00000 Kg 1,450.00 568,400.00
Pasir pasang / beton 0.31400 M3 200,000.00 62,800.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 812,700.00
2 1 m3 Pasang pondasi batu kali, 1 Pc : 2 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
PC / Portland cement 267.00000 Kg 1,450.00 387,150.00
Pasir pasang / beton 0.42700 M3 200,000.00 85,400.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 654,050.00
3 1 m3 Pasang pondasi batu kali, 1 Pc : 2,5 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
PC / Portland cement 219.00000 Kg 1,450.00 317,550.00
Pasir pasang / beton 0.44200 M3 200,000.00 88,400.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 587,450.00
4 1 m3 Pasang pondasi batu kali, 1 Pc : 3 Ps
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
PC / Portland cement 202.00000 Kg 1,450.00 292,900.00
Pasir pasang / beton 0.48500 M3 200,000.00 97,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 571,400.00
5 1 m3 Pasang pondasi batu kali, 1 Pc : 4 Ps.

7
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
PC / Portland cement 163.00000 Kg 1,450.00 236,350.00
Pasir pasang / beton 0.52000 M3 200,000.00 104,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 521,850.00
6 1 m3 Pasang pondasi batu kali, 1 Pc : 5 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
PC / Portland cement 136.00000 Kg 1,450.00 197,200.00
Pasir pasang / beton 0.54400 M3 200,000.00 108,800.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 487,500.00
7 1 m3 Pasang pondasi batu kali, 1 Pc : 6 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
PC / Portland cement 117.00000 Kg 1,450.00 169,650.00
Pasir pasang / beton 0.56100 M3 200,000.00 112,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 463,350.00
8 1 m3 Pasang pondasi batu kali, 1 Pc : 8 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
PC / Portland cement 91.00000 Kg 1,450.00 131,950.00
Pasir pasang / beton 0.56100 M3 200,000.00 112,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 425,650.00
9 1 m3 Pasang pondasi batu kali, 1 Kp : 1 Sm : 1 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
Kapur Batu 0.22900 Kg 545,500.00 124,919.50
Semen Merah 0.22900 M3 135,000.00 30,915.00
Pasir pasang / beton 0.54400 M3 200,000.00 108,800.00

8
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 446,134.50
10 1 m3 Pasang pondasi batu kali, 1 Kp : 1 SM : 2 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
Kapur Batu 0.17000 Kg 545,500.00 92,735.00
Semen Merah 0.17000 M3 135,000.00 22,950.00
Pasir pasang / beton 0.34000 M3 200,000.00 68,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 365,185.00
11 1 m3 Pasang pondasi batu kali, 1 Pc : ¼ Kp : 4 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
PC / Portland cement 156.00000 Kg 1,450.00 226,200.00
Kapur Batu 0.03200 M3 545,500.00 17,456.00
Pasir pasang / beton 0.58400 M3 200,000.00 116,800.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 541,956.00
12 1 m3 Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
PC / Portland cement 61.00000 Kg 1,450.00 88,450.00
Kapur Batu 0.14700 M3 545,500.00 80,188.50
Pasir pasang / beton 0.49200 M3 200,000.00 98,400.00
Tenaga
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 448,538.50
13 1 m3 Pasang pondasi batu kali, ¼ Pc : 1 Kp : 4 Ps.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.10000 M3 165,000.00 181,500.00
PC / Portland cement 41.00000 Kg 1,450.00 59,450.00
Kapur Batu 0.13100 M3 545,500.00 71,460.50
Pasir pasang / beton 0.52300 M3 200,000.00 104,600.00
Tenaga

9
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 1.50000 Oh 45,000.00 67,500.00
Tukang batu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.07500 Oh 68,000.00 5,100.00
110,850.00 417,010.50
14 1 m3 Pasang pondasi batu kosong
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 1.20000 M3 165,000.00 198,000.00
Pasir Urug 0.30000 M3 77,300.00 23,190.00
Tenaga
Pekerja / Buruh tak terlatih 0.78000 Oh 45,000.00 35,100.00
Tukang batu 0.39000 Oh 57,500.00 22,425.00
Kepala Tukang 0.03900 Oh 62,500.00 2,437.50
Mandor 0.03900 Oh 68,000.00 2,652.00
62,614.50 221,190.00
15 1 m3 Pasang pondasi siklop 40% batu kali
Bahan
Besi Beton / tulangan beton 75.00000 Kg 11,000.00 825,000.00
PC / Portland cement 202.00000 Kg 1,450.00 292,900.00
Pasir pasang / beton 0.32000 M3 200,000.00 64,000.00
Batu pecah 2-3 cm 0.49000 M3 260,000.00 127,400.00
Kawat Beton / bendraat 0.80000 Kg 16,400.00 13,120.00
Tenaga
Pekerja / Buruh tak terlatih 3.00000 Oh 45,000.00 135,000.00
Tukang batu 0.85000 Oh 57,500.00 48,875.00
Kepala Tukang 0.08500 Oh 62,500.00 5,312.50
Mandor 0.15000 Oh 68,000.00 10,200.00
199,387.50 1,322,420.00
16 1 m3 Pasang pondasi sumuran diameter 100 Cm.
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm 0.45000 M3 165,000.00 74,250.00
PC / Portland cement 280.00000 Kg 1,450.00 406,000.00
Pasir pasang / beton 0.45000 M3 200,000.00 90,000.00
Batu pecah 2-3 cm 0.67000 M3 260,000.00 174,200.00
Tenaga
Pekerja / Buruh tak terlatih 2.38000 Oh 45,000.00 107,100.00
Tukang batu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.08000 Oh 68,000.00 5,440.00
131,665.00 744,450.00
17 1 m' Pembuatan tiang pancang (40 X 40) Cm, beton bertulang
Bahan
Pasir Urug 0.01900 M3 77,300.00 1,468.70
Pasir pasang / beton 0.94000 M3 200,000.00 188,000.00
Batu pecah 2-3 cm 0.15000 M3 260,000.00 39,000.00
PC / Portland cement 60.50000 Kg 1,450.00 87,725.00
Besi Beton / tulangan beton 45.00000 Kg 11,000.00 495,000.00
Kawat Beton / bendraat 0.90000 Kg 16,400.00 14,760.00
Kayu bekisting 0.03200 M3 2,600,000.00 83,200.00

10
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Paku biasa 0.12000 Kg 16,000.00 1,920.00
Minyak bekisting 0.09000 Lt 5,000.00 450.00
Plamur Tembok 0.24000 Kg 9,800.00 2,352.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang batu 0.67000 Oh 57,500.00 38,525.00
Kepala Tukang 0.06700 Oh 62,500.00 4,187.50
Mandor 0.05000 Oh 68,000.00 3,400.00
91,112.50 913,875.70
18 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang
Bahan
Pasir Urug 0.01600 M3 77,300.00 1,236.80
Pasir pasang / beton 0.08000 M3 200,000.00 16,000.00
Batu pecah 2-3 cm 0.12500 M3 260,000.00 32,500.00
PC / Portland cement 49.00000 Kg 1,450.00 71,050.00
Besi Beton / tulangan beton 34.50000 Kg 11,000.00 379,500.00
Kawat Beton / bendraat 0.70000 Kg 16,400.00 11,480.00
Kayu bekisting 0.02700 M3 2,600,000.00 70,200.00
Paku biasa 0.12000 Kg 16,000.00 1,920.00
Minyak bekisting 0.09000 Lt 5,000.00 450.00
Plamur Tembok 0.20000 Kg 9,800.00 1,960.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang batu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.05000 Oh 62,500.00 3,125.00
Mandor 0.04000 Oh 68,000.00 2,720.00
70,595.00 586,296.80

IV. PEKERJAAN DINDING

1 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps


Bahan
Batu Bata / Merah 140.00000 Bh 700.00 98,000.00
PC / Portland cement 64.03000 Kg 1,450.00 92,843.50
Pasir pasang / beton 0.05900 M3 200,000.00 11,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 202,643.50
2 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps.
Bahan
Batu Bata / Merah 140.00000 Bh 700.00 98,000.00
PC / Portland cement 43.50000 Kg 1,450.00 63,075.00
Pasir pasang / beton 0.08000 M3 200,000.00 16,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00

11
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 177,075.00
3 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps
Bahan
Batu Bata / Merah 140.00000 Bh 700.00 98,000.00
PC / Portland cement 32.95000 Kg 1,450.00 47,777.50
Pasir pasang / beton 0.09100 M3 200,000.00 18,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 163,977.50
4 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps
Bahan
Batu Bata / Merah 140.00000 Bh 700.00 98,000.00
PC / Portland cement 26.55000 Kg 1,450.00 38,497.50
Pasir pasang / beton 0.09300 M3 200,000.00 18,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 155,097.50
5 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps
Bahan
Batu Bata / Merah 140.00000 Bh 700.00 98,000.00
PC / Portland cement 22.20000 Kg 1,450.00 32,190.00
Pasir pasang / beton 0.10200 M3 200,000.00 20,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 150,590.00
6 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps
Bahan
Batu Bata / Merah 140.00000 Bh 700.00 98,000.00
PC / Portland cement 18.50000 Kg 1,450.00 26,825.00
Pasir pasang / beton 0.12200 M3 200,000.00 24,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 149,225.00
7 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps
Bahan

12
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Batu Bata / Merah 140.00000 Bh 700.00 98,000.00
PC / Portland cement 10.08000 Kg 1,450.00 14,616.00
Pasir pasang / beton 0.09250 M3 200,000.00 18,500.00
Kapur Batu 0.02750 M3 545,500.00 15,001.25
Tenaga
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
44,040.00 146,117.25
8 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 1 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 700.00 49,000.00
PC / Portland cement 27.80000 Kg 1,450.00 40,310.00
Pasir pasang / beton 0.02800 M3 200,000.00 5,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 94,910.00
9 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 2 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 700.00 49,000.00
PC / Portland cement 18.95000 Kg 1,450.00 27,477.50
Pasir pasang / beton 0.03800 M3 200,000.00 7,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 84,077.50
10 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 700.00 49,000.00
PC / Portland cement 14.37000 Kg 1,450.00 20,836.50
Pasir pasang / beton 0.04000 M3 200,000.00 8,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 77,836.50
11 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 4 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 700.00 49,000.00
PC / Portland cement 11.50000 Kg 1,450.00 16,675.00
Pasir pasang / beton 0.04300 M3 200,000.00 8,600.00
Tenaga

13
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 74,275.00
12 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 5 P
Bahan
Batu Bata / Merah 70.00000 Bh 700.00 49,000.00
PC / Portland cement 9.68000 Kg 1,450.00 14,036.00
Pasir pasang / beton 0.04500 M3 200,000.00 9,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 72,036.00

13 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 6 Ps


Bahan
Batu Bata / Merah 70.00000 Bh 700.00 49,000.00
PC / Portland cement 8.32000 Kg 1,450.00 12,064.00
Pasir pasang / beton 0.04900 M3 200,000.00 9,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 70,864.00
14 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 8 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 700.00 49,000.00
PC / Portland cement 6.50000 Kg 1,450.00 9,425.00
Pasir pasang / beton 0.05000 M3 200,000.00 10,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 68,425.00
15 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Kp : 10 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 700.00 49,000.00
PC / Portland cement 4.50000 Kg 1,450.00 6,525.00
Pasir pasang / beton 0.05000 M3 200,000.00 10,000.00
Kapur Batu 0.01500 M3 545,500.00 8,182.50
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00

14
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 73,707.50
16 1 m2 Pasangan bata merah tebal ½ bata, 1 Kp : 1 Sm : 1 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 700.00 49,000.00
Semen Merah 0.01800 M3 135,000.00 2,430.00
Pasir pasang / beton 0.01800 M3 200,000.00 3,600.00
Kapur Batu 0.01800 M3 545,500.00 9,819.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 64,849.00
17 1 m2 Pasangan bata merah tebal ½ bata, 1 Kp : 1 Sm : 2 Ps
Bahan
Batu Bata / Merah 70.00000 Bh 700.00 49,000.00
Semen Merah 0.01400 Kg 135,000.00 1,890.00
Pasir pasang / beton 0.02800 M3 200,000.00 5,600.00
Kapur Batu 0.01400 M3 545,500.00 7,637.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
21,795.00 64,127.00
18 1 m3 Pasangan bataco 1 Pc : 3 Psr
Tenaga
Tukang batu 1.00000 Oh 57,500.00 57,500.00
Kepala Tukang 0.10000 Oh 62,500.00 6,250.00
Pekerja / Buruh tak terlatih 3.00000 Oh 45,000.00 135,000.00
Mandor 0.12500 Oh 68,000.00 8,500.00
Bahan
Bataco 130.00000 Bj 2,500.00 325,000.00
PC / Portland cement 157.50000 Kg 1,450.00 228,375.00
Pasir pasang / beton 0.38000 M3 200,000.00 76,000.00
629,375.00 207,250.00
1m2 pasang bataco 0.10000 62,937.50 20,725.00

V. PEKERJAAN PLESTERAN

1 1 m2 Plesteran 1 Pc : 1 Ps, tebal 15 mm.


Bahan
PC / Portland cement 12.92000 Kg 1,450.00 18,734.00
Pasir pasang / beton 0.01300 M3 200,000.00 2,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50

15
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 21,334.00
2 1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm.
Bahan
PC / Portland cement 8.52000 Kg 1,450.00 12,354.00
Pasir pasang / beton 0.01700 M3 200,000.00 3,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 15,754.00
3 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm.
Bahan
PC / Portland cement 6.48000 Kg 1,450.00 9,396.00
Pasir pasang / beton 0.01900 M3 200,000.00 3,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 13,196.00
4 1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm.
Bahan
PC / Portland cement 5.20000 Kg 1,450.00 7,540.00
Pasir pasang / beton 0.02000 M3 200,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 11,540.00
5 1 m2 Plesteran 1 Pc : 5 Ps, tebal 15 mm.
Bahan
PC / Portland cement 4.32000 Kg 1,450.00 6,264.00
Pasir pasang / beton 0.02200 M3 200,000.00 4,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 10,664.00
6 1 m2 Plesteran 1 Pc : 6 Ps, tebal 15 mm.
Bahan
PC / Portland cement 3.68000 Kg 1,450.00 5,336.00
Pasir pasang / beton 0.02300 M3 200,000.00 4,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00

16
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 9,936.00
7 1 m2 Plesteran 1 Pc : 8 Ps, tebal 15 mm.
Bahan
PC / Portland cement 2.88000 Kg 1,450.00 4,176.00
Pasir pasang / beton 0.02400 M3 200,000.00 4,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 8,976.00
8 1 m2 Plesteran 1 Pc : 0,5 Kp : 3 Ps, tebal 15 mm.
Bahan
PC / Portland cement 5.76000 Kg 1,450.00 8,352.00
Kapur Batu 0.00300 M3 545,500.00 1,636.50
Pasir pasang / beton 0.01300 M3 200,000.00 2,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 12,588.50
9 1 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm.
Bahan
PC / Portland cement 1.84000 Kg 1,450.00 2,668.00
Kapur Batu 0.00600 M3 545,500.00 3,273.00
Pasir pasang / beton 0.01400 M3 200,000.00 2,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 8,741.00
10 1 m2 Plesteran 0,5 Pc : 1 Kp : 4 Ps, tebal 15 mm.
Bahan
PC / Portland cement 3.00000 Kg 1,450.00 4,350.00
Kapur Batu 0.00500 M3 545,500.00 2,727.50
Pasir pasang / beton 0.01900 M3 200,000.00 3,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 10,877.50
11 1 m2 Plesteran 1 Kp : 1 Sm : 1 Ps, tebal 15 mm.
Bahan
Semen Merah 0.00900 M3 135,000.00 1,215.00

17
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kapur Batu 0.00900 M3 545,500.00 4,909.50
Pasir pasang / beton 0.00900 M3 200,000.00 1,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 7,924.50
12 1 m2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm.
Bahan
Semen Merah 0.00700 M3 135,000.00 945.00
Kapur Batu 0.00700 M3 545,500.00 3,818.50
Pasir pasang / beton 0.01500 M3 200,000.00 3,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.01000 Oh 68,000.00 680.00
19,242.50 7,763.50
13 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm.
Bahan
PC / Portland cement 14.28000 Kg 1,450.00 20,706.00
Pasir pasang / beton 0.02300 M3 200,000.00 4,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 25,306.00
14 1 m2 Plesteran 1 Pc : 3 Ps, tebal 20 mm.
Bahan
PC / Portland cement 10.80000 Kg 1,450.00 15,660.00
Pasir pasang / beton 0.02600 M3 200,000.00 5,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 20,860.00
15 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm.
Bahan
PC / Portland cement 8.68000 Kg 1,450.00 12,586.00
Pasir pasang / beton 0.02800 M3 200,000.00 5,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 18,186.00

18
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
16 1 m2 . Plesteran 1 Pc : 5 Ps, tebal 20 mm
Bahan
PC / Portland cement 7.29000 Kg 1,450.00 10,570.50
Pasir pasang / beton 0.02800 M3 200,000.00 5,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 16,170.50
17 1 m2 Plesteran 1 Pc : 6 Ps, tebal 20 mm.
Bahan
PC / Portland cement 6.24000 Kg 1,450.00 9,048.00
Pasir pasang / beton 0.03000 M3 200,000.00 6,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 15,048.00
18 1 m2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mm.
Bahan
Semen Merah 0.00900 M3 135,000.00 1,215.00
Kapur Batu 0.00900 M3 545,500.00 4,909.50
Pasir pasang / beton 0.01800 M3 200,000.00 3,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01250 Oh 68,000.00 850.00
24,850.00 9,724.50
19 1 m2 Plesteran 1 Pc : 2 Ps, tebal 25 mm.
Bahan
PC / Portland cement 15.50000 Kg 1,450.00 22,475.00
Pasir pasang / beton 0.01300 M3 200,000.00 2,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01300 Oh 68,000.00 884.00
27,134.00 25,075.00
20 1 m2 Plesteran 1 Pc : 3 Ps, tebal 25 mm.
Bahan
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00

19
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.01300 Oh 68,000.00 884.00
27,134.00 24,037.50
21 1 m2 Plesteran 1 Pc : 4 Ps, tebal 25 mm.
Bahan
PC / Portland cement 9.48000 Kg 1,450.00 13,746.00
Pasir pasang / beton 0.03800 M3 200,000.00 7,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01300 Oh 68,000.00 884.00
27,134.00 21,346.00
22 1 m2 Plesteran 1 Pc : 5 Ps, tebal 25 mm.
Bahan
PC / Portland cement 7.94000 Kg 1,450.00 11,513.00
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01300 Oh 68,000.00 884.00
27,134.00 19,313.00
23 1 m2 Plesteran 1 Pc : 2 Ps, tebal 30 mm.
Bahan
PC / Portland cement 18.65000 Kg 1,450.00 27,042.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.01500 Oh 68,000.00 1,020.00
28,482.50 34,042.50
24 1 m2 Plesteran 1 Pc : 3 Ps, tebal 30 mm.
Bahan
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.01500 Oh 68,000.00 1,020.00
31,357.50 28,317.50
25 1 m2 Plesteran 1 Pc : 4 Ps, tebal 30 mm.
Bahan
PC / Portland cement 11.38000 Kg 1,450.00 16,501.00
Pasir pasang / beton 0.04200 M3 200,000.00 8,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00

20
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.01500 Oh 68,000.00 1,020.00
31,357.50 24,901.00
26 1 m2 Plesteran 1 Pc : 5 Ps, tebal 30 mm.
Bahan
PC / Portland cement 8.19000 Kg 1,450.00 11,875.50
Pasir pasang / beton 0.04500 M3 200,000.00 9,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.01500 Oh 68,000.00 1,020.00
31,357.50 20,875.50
27 1 m2 Berapen 1 Pc : 3 Ps, tebal 30 mm.
Bahan
PC / Portland cement 7.07000 Kg 1,450.00 10,251.50
Pasir pasang / beton 0.02100 M3 200,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00800 Oh 68,000.00 544.00
11,756.50 14,451.50
28 1 m2 Berapen 1 Pc : 5 Ps, tebal 15 mm.
Bahan
PC / Portland cement 5.67000 Kg 1,450.00 8,221.50
Pasir pasang / beton 0.02300 M3 200,000.00 4,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00800 Oh 68,000.00 544.00
11,756.50 12,821.50
29 1 m2 Plesteran Beton 1 Pc : 2 Ps, tebal 15 mm.
Bahan
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 200,000.00 3,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.26000 Oh 45,000.00 11,700.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01300 Oh 68,000.00 884.00
25,334.00 17,085.00
30 1 m2 Plesteran Beton 1 Pc : 3 Ps, tebal 15 mm.
Bahan
PC / Portland cement 7.07000 Kg 1,450.00 10,251.50
Pasir pasang / beton 0.02100 M3 200,000.00 4,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.26000 Oh 45,000.00 11,700.00

21
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.01300 Oh 68,000.00 884.00
25,334.00 14,451.50
31 1 m2 Plesteran Skoning 1 Pc : 2 Ps.
Bahan
PC / Portland cement 0.50000 Kg 1,450.00 725.00
Pasir pasang / beton 0.00200 M3 200,000.00 400.00
Tenaga
Pekerja / Buruh tak terlatih 0.05700 Oh 45,000.00 2,565.00
Tukang batu 0.03800 Oh 57,500.00 2,185.00
Kepala Tukang 0.03800 Oh 62,500.00 2,375.00
Mandor 0.00200 Oh 68,000.00 136.00
7,261.00 1,125.00
32 1 m2 Plesteran Ciprat. 1 Pc : 2 Ps
Bahan
PC / Portland cement 4.32000 Kg 1,450.00 6,264.00
Pasir pasang / beton 0.01600 M3 200,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01500 Oh 68,000.00 1,020.00
18,645.00 9,464.00
33 1 m2 Plesteran siar adukan 1 pc : 2 ps
Bahan
PC / Portland cement 4.32000 Kg 1,450.00 6,264.00
Pasir pasang / beton 0.01600 M3 200,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00800 Oh 68,000.00 544.00
11,756.50 9,464.00
34 1 m' Benangan / Tali Air / Sudut Kol kolan 1 pc : 3 ps
Bahan
PC / Portland cement 1.0000 Oh 1,450.00 1,450.00
Pasir pasang / beton 0.0200 Oh 200,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.0500 Kg 45,000.00 2,250.00
Tukang batu 0.0150 M3 57,500.00 862.50
3,112.50 5,450.00

VI. PEKERJAAN KAYU

1 1 m3 Pasang kusen pintu dan jendela kayu jati eks Bojonegoro


Bahan
Kayu Jati Balok eks. Bojonegoro 1.10000 M3 23,409,100.00 25,750,010.00

22
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 20.00000 Oh 57,500.00 1,150,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,565,400.00 25,750,010.00
2 1 m3 Pasang kusen pintu dan jendela kayu jati
Bahan
Kayu Jati Balok lokal 1.10000 M3 20,000,000.00 22,000,000.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 20.00000 Oh 57,500.00 1,150,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,565,400.00 22,000,000.00
3 1 m3 Pasang kusen pintu dan jendela kayu kamper.
Bahan
Kayu Kamper Balok 1.20000 M3 10,450,000.00 12,540,000.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 12,540,000.00
4 1 m3 Pasang kusen pintu dan jendela kayu balau
Bahan
Kayu Balau Balok 1.20000 M3 9,800,000.00 11,760,000.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 11,760,000.00
5 1 m3 Pasang kusen pintu dan jendela kayu kempas
Bahan
Kayu Kempas Balok 1.20000 M3 8,000,000.00 9,600,000.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 9,600,000.00
6 1 m3 Pasang kusen pintu dan jendela kayu kruing
Bahan
Kayu Kruing Balok 1.20000 M3 8,000,000.00 9,600,000.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00

23
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 9,600,000.00
7 1 m3 Pasang kusen pintu dan jendela kayu Meranti
Bahan :
Kayu Meranti Balok 1.20000 M3 5,600,000.00 6,720,000.00
Tenaga :
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 6,720,000.00
8 1 m3 Pasang kusen pintu dan jendela kayu Akasia
Bahan :
Kayu Tahun Balok ( Mauni/ Akasia ) 1.20000 M3 4,250,000.00 5,100,000.00
Tenaga :
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang kayu 18.00000 Oh 57,500.00 1,035,000.00
Kepala Tukang 2.00000 Oh 62,500.00 125,000.00
Mandor 0.30000 Oh 68,000.00 20,400.00
1,450,400.00 5,100,000.00
9 1 m2 Pasang pintu klamp kayu kamper
Bahan
Kayu Kamper papan 0.03600 M3 10,900,000.00 392,400.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.35000 Oh 45,000.00 15,750.00
Tukang kayu 1.05000 Oh 57,500.00 60,375.00
Kepala Tukang 0.10500 Oh 62,500.00 6,562.50
Mandor 0.01800 Oh 68,000.00 1,224.00
83,911.50 393,200.00
10 1 m2 Pasang pintu klamp kayu balau
Bahan
Kayu Balau Papan 0.03600 M3 10,300,000.00 370,800.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.35000 Oh 45,000.00 15,750.00
Tukang kayu 1.05000 Oh 57,500.00 60,375.00
Kepala Tukang 0.10500 Oh 62,500.00 6,562.50
Mandor 0.01800 Oh 68,000.00 1,224.00
83,911.50 371,600.00
11 1 m2 Pasang pintu panel kayu jati eks Bojonegoro
Bahan
Kayu Jati Papan eks. Bojonegoro 0.04000 M3 31,363,700.00 1,254,548.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 1,254,548.00

24
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
12 1 m2 Pasang pintu panel kayu jati
Bahan
Kayu jati papan lokal 0.04000 M3 20,454,600.00 818,184.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 818,184.00
13 1 m2 Pasang pintu panel kayu kanfer
Bahan
Kayu Kamper papan 0.04000 M3 10,900,000.00 436,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 436,000.00
14 1 m2 Pasang pintu panel kayu balau
Bahan
Kayu Balau Papan 0.04000 M3 10,300,000.00 412,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 412,000.00
15 1 m2 Pasang pintu panel kayu Kruing
Bahan :
Kayu Kruing Papan 0.04000 M3 8,500,000.00 340,000.00
Tenaga :
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 340,000.00
16 1 m2 Pasang pintu panel kayu Kempas
Bahan :
Kayu Kempas Papan 0.04000 M3 8,500,000.00 340,000.00
Tenaga :
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 340,000.00
17 1 m2 Pasang pintu panel kayu Meranti
Bahan :
Kayu Meranti Papan 0.04000 M3 6,100,000.00 244,000.00
Tenaga :

25
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 244,000.00
18 1 m2 Pasang pintu panel kayu Akasia
Bahan :
Kayu Tahun papan ( Mauni/akasia) 0.04000 M3 4,545,500.00 181,820.00
Tenaga :
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
207,775.00 181,820.00
19 1 m2 Pasang pintu dan jendela kaca kayu jati eks Bojonegoro
Bahan
Kayu Jati Papan eks. Bojonegoro 0.03500 M3 31,363,700.00 1,097,729.50
Kaca Bening Uk. 5 mm 0.48000 m2 55,000.00 26,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 1,124,129.50
20 1 m2 Pasang pintu dan jendela kaca kayu jati
Bahan
Kayu jati papan lokal 0.03500 M3 20,454,600.00 715,911.00
Kaca Bening Uk. 5 mm 0.48000 m2 55,000.00 26,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 742,311.00
21 1 m2 Pasang pintu dan jendela kaca kayu kamper
Bahan
Kayu Kamper papan 0.03500 M3 10,900,000.00 381,500.00
Kaca Bening Uk. 5 mm 0.48000 m2 55,000.00 26,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 407,900.00
22 1 m2 Pasang pintu dan jendela kaca kayu balau
Bahan
Kayu Balau Papan 0.03500 M3 10,300,000.00 360,500.00
Kaca Bening Uk. 5 mm 0.48000 m2 55,000.00 26,400.00
Tenaga

26
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 386,900.00
23 1 m2 Pasang pintu dan jendela kaca kayu kempas
Bahan
Kayu Kempas Papan 0.03500 M3 8,500,000.00 297,500.00
Kaca Bening Uk. 5 mm 0.48000 m2 55,000.00 26,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 323,900.00
24 1 m2 Pasang pintu dan jendela kaca kayu kruing
Bahan
Kayu Kruing Papan 0.03500 M3 8,500,000.00 297,500.00
Kaca Bening Uk. 5 mm 0.48000 m2 55,000.00 26,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 323,900.00
25 1 m2 Pasang pintu dan jendela kaca kayu meranti
Bahan
Kayu Meranti Papan 0.03500 M3 6,100,000.00 213,500.00
Kaca Bening Uk. 5 mm 0.48000 m2 55,000.00 26,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 239,900.00
26 1 m2 Pasang pintu dan jendela kaca kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.03500 M3 4,545,500.00 159,092.50
Kaca Bening Uk. 5 mm 0.48000 m2 55,000.00 26,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.04000 Oh 68,000.00 2,720.00
166,220.00 185,492.50
27 1 m2 Pasang pintu dan jendela jalusi kayu jati eks Bojonegoro
Bahan
Kayu Jati Papan eks. Bojonegoro 0.06400 M3 31,363,700.00 2,007,276.80
Tenaga

27
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.30000 Oh 68,000.00 20,400.00
256,650.00 2,007,276.80
28 1 m2 Pasang pintu dan jendela jalusi kayu jati
Bahan
Kayu jati papan lokal 0.06400 M3 20,454,600.00 1,309,094.40
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.30000 Oh 68,000.00 20,400.00
256,650.00 1,309,094.40
29 1 m2 Pasang pintu dan jendela jalusi kayu kamper
Bahan
Kayu Kamper papan 0.06400 M3 10,900,000.00 697,600.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00
270,250.00 697,600.00
30 1 m2 Pasang pintu dan jendela jalusi kayu balau
Bahan
Kayu Balau Papan 0.06400 M3 10,300,000.00 659,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00
270,250.00 659,200.00
31 1 m2 Pasang pintu dan jendela jalusi kayu kruing
Bahan
Kayu Kruing Papan 0.06400 M3 8,500,000.00 544,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00
270,250.00 544,000.00
32 1 m2 Pasang pintu dan jendela jalusi kayu kempas
Bahan
Kayu Kempas Papan 0.06400 M3 8,500,000.00 544,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00

28
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
270,250.00 544,000.00
33 1 m2 Pasang pintu dan jendela jalusi kayu meranti
Bahan
Kayu Meranti Papan 0.06400 M3 6,100,000.00 390,400.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00
270,250.00 390,400.00
34 1 m2 Pasang pintu dan jendela jalusi kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.06400 M3 4,545,500.00 290,912.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 3.00000 Oh 57,500.00 172,500.00
Kepala Tukang 0.30000 Oh 62,500.00 18,750.00
Mandor 0.50000 Oh 68,000.00 34,000.00
270,250.00 290,912.00
35 1 m2 Pasang jalusi mati kusen kayu jati eks Bojonegoro
Bahan
Kayu Jati Papan eks. Bojonegoro 0.06000 M3 31,363,700.00 1,881,822.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 1,884,222.00
36 1 m2 Pasang jalusi mati kusen kayu jati
Bahan
Kayu jati papan lokal 0.06000 M3 20,454,600.00 1,227,276.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 1,229,676.00
37 1 m2 Pasang jalusi mati kusen kayu kanfer
Bahan
Kayu Kamper papan 0.06000 M3 10,900,000.00 654,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 656,400.00

29
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
38 1 m2 Pasang jalusi mati kusen kayu balau
Bahan
Kayu Balau Papan 0.06000 M3 10,300,000.00 618,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 620,400.00
39 1 m2 Pasang jalusi mati kusen kayu kempas
Bahan
Kayu Kempas Papan 0.06000 M3 8,500,000.00 510,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 512,400.00
40 1 m2 Pasang jalusi mati kusen kayu kruing
Bahan
Kayu Kruing Papan 0.06000 M3 8,500,000.00 510,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 512,400.00
41 1 m2 Pasang jalusi mati kusen kayu meranti
Bahan
Kayu Meranti Papan 0.06000 M3 6,100,000.00 366,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00
151,700.00 368,400.00
42 1 m2 Pasang jalusi mati kusen kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.06000 M3 4,545,500.00 272,730.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.50000 Oh 45,000.00 22,500.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.02500 Oh 68,000.00 1,700.00

30
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
151,700.00 275,130.00
43 1 m2 Pasang pintu plywood rangkap, rangka kayu jati
Bahan
Kayu jati papan lokal 0.01960 M3 20,454,600.00 400,910.16
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 469,990.16
44 1 m2 Pasang pintu plywood rangkap, rangka kayu kamper
Bahan
Kayu Kamper papan 0.01960 M3 10,900,000.00 213,640.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 282,720.00
45 1 m2 Pasang pintu plywood rangkap, rangka kayu balau
Bahan
Kayu Balau Papan 0.01960 M3 10,300,000.00 201,880.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 270,960.00
46 1 m2 Pasang pintu plywood rangkap, rangka kayu kempas
Bahan
Kayu Kempas Papan 0.01960 M3 8,500,000.00 166,600.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 235,680.00

31
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
47 1 m2 Pasang pintu plywood rangkap, rangka kayu kruing
Bahan
Kayu Kruing Papan 0.01960 M3 8,500,000.00 166,600.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 235,680.00
48 1 m2 Pasang pintu plywood rangkap, rangka kayu meranti
Bahan
Kayu Meranti Papan 0.01960 M3 6,100,000.00 119,560.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 188,640.00
49 1 m2 Pasang pintu plywood rangkap, rangka kayu akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01960 M3 4,545,500.00 89,091.80
Paku biasa 0.03000 Kg 16,000.00 480.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 158,171.80
50 1 m2 Pasang pintu teakwood rangkap, rangka kayu jati
Bahan
Kayu Jati Papan lokal 0.01960 M3 20,454,600.00 400,910.16
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 518,210.16
51 1 m2 Pasang pintu teakwood rangkap, rangka kayu kamper

32
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
Kayu Kamper Papan 0.01960 M3 10,900,000.00 213,640.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 330,940.00
52 1 m2 Pasang pintu teakwood rangkap, rangka kayu balau
Bahan
Kayu Balau Papan 0.01960 M3 10,300,000.00 201,880.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 319,180.00
53 1 m2 Pasang pintu teakwood rangkap, rangka kayu kempas
Bahan
Kayu Kempas Papan 0.01960 M3 8,500,000.00 166,600.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 283,900.00
54 1 m2 Pasang pintu teakwood rangkap, rangka kayu kruing
Bahan
Kayu Kruing Papan 0.01960 M3 8,500,000.00 166,600.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 283,900.00
55 1 m2 Pasang pintu teakwood rangkap, rangka kayu Akasia
Bahan

33
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kayu Tahun papan ( Mauni/akasia) 0.01960 M3 4,545,500.00 89,091.80
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.30000 Lt 12,000.00 3,600.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 2.00000 Oh 57,500.00 115,000.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.03000 Oh 68,000.00 2,040.00
156,540.00 206,391.80
56 1 m2 Pasang pintu plywood & formika, rangka kayu jati
Bahan
Kayu jati papan lokal 0.01960 M3 20,454,600.00 400,910.16
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 604,310.16
57 1 m2 Pasang pintu plywood & formika rangka kayu kamper
Bahan
Kayu Kamper papan 0.01960 M3 10,900,000.00 213,640.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 417,040.00
58 1 m2 Pasang pintu plywood & formika rangka kayu balau
Bahan
Kayu Balau Papan 0.01960 M3 10,300,000.00 201,880.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 405,280.00

34
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
59 1 m2 Pasang pintu plywood & formika rangka kayu kempas
Bahan
Kayu Kempas Papan 0.01960 M3 8,500,000.00 166,600.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 370,000.00
60 1 m2 Pasang pintu plywood & formika rangka kayu kruing
Bahan
Kayu Kruing Papan 0.01960 M3 8,500,000.00 166,600.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 370,000.00
61 1 m2 Pasang pintu plywood & formika rangka kayu meranti
Bahan
Kayu Meranti Papan 0.01960 M3 6,100,000.00 119,560.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 322,960.00
62 1 m2 Pasang pintu plywood & formika rangka kayu akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01960 M3 4,545,500.00 89,091.80
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00

35
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 292,491.80
63 1 m2 Pasang pintu teakwood & formika rangka kayu jati ( divernis )
Bahan
Kayu jati papan lokal 0.01960 M3 20,454,600.00 400,910.16
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 108,900.00 54,450.00
Vernis 0.50000 Lbr 36,000.00 18,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 611,760.16
64 1 m2 Pasang pintu teakwood & formika rangka kayu kamper ( divernis )
Bahan
Kayu Kamper papan 0.01960 M3 10,900,000.00 213,640.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 108,900.00 54,450.00
Vernis 0.50000 Lt 36,000.00 18,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 424,490.00
65 1 m2 Pasang pintu teakwood & formika rangka kayu balau ( divernis )
Bahan
Kayu Balau Papan 0.01960 M3 10,300,000.00 201,880.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 108,900.00 54,450.00
Vernis 0.50000 Lt 36,000.00 18,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 412,730.00
66 1 m2 Pasang pintu teakwood & formika rangka kayu kempas ( divernis )
Bahan
Kayu Kempas Papan 0.01960 M3 8,500,000.00 166,600.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00

36
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 108,900.00 54,450.00
Vernis 0.50000 Lt 36,000.00 18,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 377,450.00
67 1 m2 Pasang pintu teakwood & formika rangka kayu kruing ( divernis )
Bahan
Kayu Kruing Papan 0.01960 M3 8,500,000.00 166,600.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 108,900.00 54,450.00
Vernis 0.50000 Lt 36,000.00 18,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 377,450.00
68 1 m2 Pasang pintu teakwood & formika rangka kayu meranti ( divernis )
Bahan
Kayu Meranti Papan 0.01960 M3 6,100,000.00 119,560.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 108,900.00 54,450.00
Vernis 0.50000 Lt 36,000.00 18,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 330,410.00
69 1 m2 Pasang pintu teakwood & formika rangka kayu akasia ( divernis )
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01960 M3 4,545,500.00 89,091.80
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 0.80000 Lt 12,000.00 9,600.00
Teakwood ( 122 X 242 ) Cm 0.50000 Lbr 108,900.00 54,450.00
Vernis 0.50000 Lt 36,000.00 18,000.00
Formika 0.50000 Lbr 248,000.00 124,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.80000 Oh 45,000.00 36,000.00
Tukang kayu 2.50000 Oh 57,500.00 143,750.00

37
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.25000 Oh 62,500.00 15,625.00
Mandor 0.04000 Oh 68,000.00 2,720.00
198,095.00 299,941.80
70 1 m2 Pasang pintu formika double, rangka kayu jati
Bahan
Kayu jati papan lokal 0.01960 M3 20,454,600.00 400,910.16
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 12,000.00 14,400.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Formika 1.00000 Lbr 248,000.00 248,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 777,010.16
71 1 m2 Pasang pintu formika double, rangka kayu kamper
Bahan
Kayu Kamper Papan 0.01960 M3 10,900,000.00 213,640.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 12,000.00 14,400.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Formika 1.00000 Lbr 248,000.00 248,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 589,740.00
72 1 m2 Pasang pintu formika double, rangka kayu balau
Bahan
Kayu Balau Papan 0.01960 M3 10,300,000.00 201,880.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 12,000.00 14,400.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Formika 1.00000 Lbr 248,000.00 248,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 577,980.00
73 1 m2 Pasang pintu formika double, rangka kayu kempas
Bahan
Kayu Kempas Papan 0.01960 M3 8,500,000.00 166,600.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 12,000.00 14,400.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Formika 1.00000 Lbr 248,000.00 248,000.00

38
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 542,700.00
74 1 m2 Pasang pintu formika double, rangka kayu kruing
Bahan
Kayu Kruing Papan 0.01960 M3 8,500,000.00 166,600.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 12,000.00 14,400.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Formika 1.00000 Lbr 248,000.00 248,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 542,700.00
75 1 m2 Pasang pintu formika double, rangka kayu meranti
Bahan
Kayu Meranti Papan 0.01960 M3 6,100,000.00 119,560.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 12,000.00 14,400.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Formika 1.00000 Lbr 248,000.00 248,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 495,660.00
76 1 m2 Pasang pintu formika double, rangka kayu akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01960 M3 4,545,500.00 89,091.80
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Lem ( Kayu + Tembok ) 1.20000 Lt 12,000.00 14,400.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Formika 1.00000 Lbr 248,000.00 248,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang kayu 2.60000 Oh 57,500.00 149,500.00
Kepala Tukang 0.26000 Oh 62,500.00 16,250.00
Mandor 0.05000 Oh 68,000.00 3,400.00
214,150.00 465,191.80
77 1 m3 Pasang konstruksi kuda-kuda kayu jati
Bahan
Kayu Jati Balok lokal 1.10000 M3 20,000,000.00 22,000,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00

39
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 22,272,300.00
78 1 m3 Pasang konstruksi kuda-kuda kayu kamper
Bahan
Kayu Kamper Balok 1.10000 M3 10,450,000.00 11,495,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 11,767,300.00
79 1 m3 Pasang konstruksi kuda-kuda kayu balau
Bahan
Kayu Balau Balok 1.10000 M3 9,800,000.00 10,780,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 11,052,300.00
80 1 m3 Pasang konstruksi kuda-kuda kayu kempas
Bahan
Kayu Kempas Balok 1.10000 M3 8,000,000.00 8,800,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 9,072,300.00
81 1 m3 Pasang konstruksi kuda-kuda kayu kruing
Bahan
Kayu Kruing Balok 1.10000 M3 8,000,000.00 8,800,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00

40
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 9,072,300.00
82 1 m3 Pasang konstruksi kuda-kuda kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 1.10000 M3 4,250,000.00 4,675,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 0.80000 Kg 16,000.00 12,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
Tukang kayu 12.00000 Oh 57,500.00 690,000.00
Kepala Tukang 1.20000 Oh 62,500.00 75,000.00
Mandor 0.20000 Oh 68,000.00 13,600.00
958,600.00 4,947,300.00
83 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu jati
Bahan :
Kayu Jati Balok lokal 1.10000 M3 20,000,000.00 22,000,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 22,307,500.00
84 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu kanfer
Bahan :
Kayu Kamper Balok 1.10000 M3 10,450,000.00 11,495,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 11,802,500.00
85 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Balau
Bahan :
Kayu Balau Balok 1.10000 M3 9,800,000.00 10,780,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 11,087,500.00
86 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Kempas
Bahan :
Kayu Kempas Balok 1.10000 M3 8,000,000.00 8,800,000.00

41
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 9,107,500.00
87 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Kruing
Bahan :
Kayu Kruing Balok 1.10000 M3 8,000,000.00 8,800,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 9,107,500.00
88 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Meranti
Bahan :
Kayu Meranti Balok 1.10000 M3 5,600,000.00 6,160,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga :
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 6,467,500.00
89 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Akasia
Bahan :
Kayu Tahun Balok ( Mauni/ Akasia ) 1.10000 M3 4,250,000.00 4,675,000.00
Besi Beugel/Baut 15.00000 Kg 17,300.00 259,500.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Tenaga : #N/A
Pekerja / Buruh tak terlatih 2.40000 Oh 45,000.00 108,000.00
Tukang kayu 7.20000 Oh 57,500.00 414,000.00
Kepala Tukang 0.72000 Oh 62,500.00 45,000.00
Mandor 0.12000 Oh 68,000.00 8,160.00
575,160.00 4,982,500.00
90 1 m2 Pasang kaso + reng genteng kodok kayu jati
Bahan
Kayu Jati Balok lokal 0.00700 M3 20,000,000.00 140,000.00
Kayu Jati Balok lokal 0.00500 M3 20,000,000.00 100,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00

42
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 242,400.00
91 1 m2 Pasang kaso + reng genteng kodok kayu kamper
Bahan
Kayu Kamper Balok 0.00700 M3 10,450,000.00 73,150.00
Kayu Kamper Balok 0.00500 M3 10,450,000.00 52,250.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 127,800.00
92 1 m2 Pasang kaso + reng genteng kodok kayu balau
Bahan
Kayu Balau Balok 0.00700 M3 9,800,000.00 68,600.00
Kayu Balau Balok 0.00500 M3 9,800,000.00 49,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 120,000.00
93 1 m2 Pasang kaso + reng genteng kodok kayu kempas
Bahan
Kayu Kempas Balok 0.00700 M3 8,000,000.00 56,000.00
Kayu Kempas Balok 0.00500 M3 8,000,000.00 40,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 98,400.00
94 1 m2 Pasang kaso + reng genteng kodok kayu kruing
Bahan
Kayu Kruing Balok 0.00700 M3 8,000,000.00 56,000.00
Kayu Kruing Balok 0.00500 M3 8,000,000.00 40,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 98,400.00
95 1 m2 Pasang kaso + reng genteng kodok kayu meranti
Bahan

43
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kayu Meranti Balok 0.00700 M3 5,600,000.00 39,200.00
Kayu Meranti Balok 0.00500 M3 5,600,000.00 28,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 69,600.00
96 1 m2 Pasang kaso + reng genteng kodok kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.00700 M3 4,250,000.00 29,750.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.00500 M3 4,250,000.00 21,250.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 53,400.00
97 1 m2 Pasang kaso + reng genteng MKP lokal kayu jati
Bahan
Kayu Jati Balok lokal 0.00700 M3 20,000,000.00 140,000.00
Kayu Jati Balok lokal 0.00500 M3 20,000,000.00 100,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 242,400.00
98 1 m2 Pasang kaso + reng genteng MKP lokal kayu kamper
Bahan
Kayu Kamper Balok 0.00700 M3 10,450,000.00 73,150.00
Kayu Kamper Balok 0.00500 M3 10,450,000.00 52,250.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 127,800.00
99 1 m2 Pasang kaso + reng genteng MKP lokal kayu balau
Bahan
Kayu Balau Balok 0.00700 M3 9,800,000.00 68,600.00
Kayu Balau Balok 0.00500 M3 9,800,000.00 49,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00

44
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 120,000.00
100 1 m2 Pasang kaso + reng genteng MKP lokal kayu kempas
Bahan
Kayu Kempas Balok 0.00700 M3 8,000,000.00 56,000.00
Kayu Kempas Balok 0.00500 M3 8,000,000.00 40,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 98,400.00
101 1 m2 Pasang kaso + reng genteng MKP lokal kayu kruing
Bahan
Kayu Kruing Balok 0.00700 M3 8,000,000.00 56,000.00
Kayu Kruing Balok 0.00500 M3 8,000,000.00 40,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga #N/A
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 98,400.00
102 1 m2 Pasang kaso + reng genteng MKP lokal kayu meranti
Bahan
Kayu Meranti Balok 0.00700 M3 5,600,000.00 39,200.00
Kayu Meranti Balok 0.00500 M3 5,600,000.00 28,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 69,600.00
103 1 m2 Pasang kaso + reng genteng MKP lokal kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.00700 M3 4,250,000.00 29,750.00
Kayu Tahun Balok ( Mauni/ Akasia ) 0.00500 M3 4,250,000.00 21,250.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 53,400.00
104 1 m2 Pasang kaso + reng genteng monier kayu jati

45
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
Kayu Jati Balok lokal 0.01400 M3 20,000,000.00 280,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 282,400.00
105 1 m2 Pasang kaso + reng genteng monier kayu kamper
Bahan
Kayu Kamper Balok 0.01400 M3 10,450,000.00 146,300.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 148,700.00
106 1 m2 Pasang kaso + reng genteng monier kayu balau
Bahan
Kayu Balau Balok 0.01400 M3 9,800,000.00 137,200.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 139,600.00
107 1 m2 Pasang kaso + reng genteng monier kayu kempas
Bahan
Kayu Kempas Balok 0.01400 M3 8,000,000.00 112,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 114,400.00
108 1 m2 Pasang kaso + reng genteng monier kayu kruing
Bahan
Kayu Kruing Balok 0.01400 M3 8,000,000.00 112,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 114,400.00

46
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
109 1 m2 Pasang kaso + reng genteng monier kayu meranti
Bahan
Kayu Meranti Balok 0.01400 M3 5,600,000.00 78,400.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 80,800.00
110 1 m2 Pasang kaso + reng genteng monier kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01400 M3 4,250,000.00 59,500.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 61,900.00
111 1 m2 Pasang kaso + reng genteng beton kayu jati
Bahan
Kayu Jati Balok lokal 0.01400 M3 20,000,000.00 280,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 282,400.00
112 1 m2 Pasang kaso + reng genteng beton kayu kanfer
Bahan
Kayu Kamper Balok 0.01400 M3 10,450,000.00 146,300.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 148,700.00
113 1 m2 Pasang kaso + reng genteng beton kayu balau
Bahan
Kayu Balau Balok 0.01400 M3 9,800,000.00 137,200.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00

47
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
11,215.00 139,600.00
114 1 m2 Pasang kaso + reng genteng beton kayu kempas
Bahan
Kayu Kempas Balok 0.01400 M3 8,000,000.00 112,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 114,400.00
115 1 m2 Pasang kaso + reng genteng beton kayu kruing
Bahan
Kayu Kruing Balok 0.01400 M3 8,000,000.00 112,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 114,400.00
116 1 m2 Pasang kaso + reng genteng beton kayu meranti
Bahan
Kayu Meranti Balok 0.01400 M3 5,600,000.00 78,400.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 80,800.00
117 1 m2 Pasang kaso + reng genteng beton kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01400 M3 4,250,000.00 59,500.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,215.00 61,900.00
118 1 m2 Pasang kaso + reng atap sirap kayu jati
Bahan
Kayu Jati Balok lokal 0.16500 M3 20,000,000.00 3,300,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00

48
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 3,303,200.00
119 1 m2 Pasang kaso + reng atap sirap kayu kamper
Bahan
Kayu Kamper Balok 0.16500 M3 10,450,000.00 1,724,250.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 1,727,450.00
120 1 m2 Pasang kaso + reng atap sirap kayu balau
Bahan
Kayu Balau Balok 0.16500 M3 9,800,000.00 1,617,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 1,620,200.00
121 1 m2 Pasang kaso + reng atap sirap kayu kempas
Bahan
Kayu Kempas Balok 0.16500 M3 8,000,000.00 1,320,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 1,323,200.00
122 1 m2 Pasang kaso + reng atap sirap kayu kruing
Bahan
Kayu Kruing Balok 0.16500 M3 8,000,000.00 1,320,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 1,323,200.00
123 1 m2 Pasang kaso + reng atap sirap kayu meranti
Bahan
Kayu Meranti Balok 0.16500 M3 5,600,000.00 924,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00

49
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 927,200.00
124 1 m2 Pasang kaso + reng atap sirap kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.16500 M3 4,250,000.00 701,250.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 704,450.00
125 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu jati
Bahan
Kayu Jati Balok lokal 0.01200 M3 20,000,000.00 240,000.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 241,600.00
126 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kamper
Bahan
Kayu Kamper Balok 0.01200 M3 10,450,000.00 125,400.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 127,000.00
127 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu balau
Bahan
Kayu Balau Balok 0.01200 M3 9,800,000.00 117,600.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 119,200.00
128 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kempas
Bahan
Kayu Kempas Balok 0.01200 M3 8,000,000.00 96,000.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00

50
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 97,600.00
129 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kruing
Bahan
Kayu Kruing Balok 0.01200 M3 8,000,000.00 96,000.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 97,600.00
130 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu meranti
Bahan
Kayu Meranti Balok 0.01200 M3 5,600,000.00 67,200.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 68,800.00
131 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01200 M3 4,250,000.00 51,000.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 52,600.00
132 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu jati
Bahan
Kayu Jati Balok lokal 0.02300 M3 20,000,000.00 460,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 462,400.00
133 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kamper
Bahan
Kayu Kamper Balok 0.02300 M3 10,450,000.00 240,350.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga

51
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 242,750.00
134 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu balau
Bahan
Kayu Balau Balok 0.02300 M3 9,800,000.00 225,400.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 227,800.00
135 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kempas
Bahan
Kayu Kempas Balok 0.02300 M3 8,000,000.00 184,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 186,400.00
136 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kruing
Bahan
Kayu Kruing Balok 0.02300 M3 8,000,000.00 184,000.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 186,400.00
137 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu meranti
Bahan
Kayu Meranti Balok 0.02300 M3 5,600,000.00 128,800.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 131,200.00
138 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.02300 M3 4,250,000.00 97,750.00
Paku biasa 0.15000 Kg 16,000.00 2,400.00

52
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.30000 Oh 57,500.00 17,250.00
Kepala Tukang 0.03000 Oh 62,500.00 1,875.00
Mandor 0.01000 Oh 68,000.00 680.00
28,805.00 100,150.00
139 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu jati
Bahan
Kayu Jati Balok lokal 0.02700 M3 20,000,000.00 540,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 543,200.00
140 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kamper
Bahan
Kayu Kamper Balok 0.02700 M3 10,450,000.00 282,150.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 285,350.00
141 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu balau
Bahan
Kayu Balau Balok 0.02700 M3 9,800,000.00 264,600.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 267,800.00
142 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kempas
Bahan
Kayu Kempas Balok 0.02700 M3 8,000,000.00 216,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 219,200.00
143 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kruing
Bahan
Kayu Kruing Balok 0.02700 M3 8,000,000.00 216,000.00

53
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 219,200.00
144 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu meranti
Bahan
Kayu Meranti Balok 0.02700 M3 5,600,000.00 151,200.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 154,400.00
145 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.02700 M3 4,250,000.00 114,750.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang kayu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.01250 Oh 68,000.00 850.00
34,412.50 117,950.00
146 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu jati.
Bahan
Kayu jati papan lokal 0.00720 M3 20,454,600.00 147,273.12
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00500 Oh 68,000.00 340.00
17,902.50 148,073.12
147 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kamper
Bahan
Kayu Kamper papan 0.00720 M3 10,900,000.00 78,480.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00500 Oh 68,000.00 340.00
17,590.00 79,280.00
148 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu balau
Bahan

54
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kayu Balau Papan 0.00720 M3 10,300,000.00 74,160.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00500 Oh 68,000.00 340.00
17,902.50 74,960.00
149 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kempas
Bahan
Kayu Kempas Papan 0.00720 M3 8,500,000.00 61,200.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00500 Oh 68,000.00 340.00
17,590.00 62,000.00
150 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kruing
Bahan
Kayu Kruing Papan 0.00720 M3 8,500,000.00 61,200.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00500 Oh 68,000.00 340.00
17,902.50 62,000.00
151 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu meranti
Bahan
Kayu Meranti Papan 0.00720 M3 6,100,000.00 43,920.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00500 Oh 68,000.00 340.00
17,590.00 44,720.00
152 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.00720 M3 4,545,500.00 32,727.60
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00500 Oh 68,000.00 340.00
17,590.00 33,527.60
153 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu jati

55
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
Kayu jati papan lokal 0.01100 M3 20,454,600.00 225,000.60
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 225,800.60
154 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kamper
Bahan
Kayu Kamper papan 0.01100 M3 10,900,000.00 119,900.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 120,700.00
155 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu balau
Bahan
Kayu Balau Papan 0.01100 M3 10,300,000.00 113,300.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 114,100.00
156 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kempas
Bahan
Kayu Kempas Papan 0.01100 M3 8,500,000.00 93,500.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 94,300.00
157 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kruing
Bahan
Kayu Kruing Papan 0.01100 M3 8,500,000.00 93,500.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 94,300.00

56
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
158 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu meranti
Bahan
Kayu Meranti Papan 0.01100 M3 6,100,000.00 67,100.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 67,900.00
159 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01100 M3 4,545,500.00 50,000.50
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.11000 Oh 45,000.00 4,950.00
Tukang kayu 0.22000 Oh 57,500.00 12,650.00
Kepala Tukang 0.02200 Oh 62,500.00 1,375.00
Mandor 0.00500 Oh 68,000.00 340.00
19,315.00 50,800.50
160 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu jati
Bahan
Kayu jati papan lokal 0.01450 M3 20,454,600.00 296,591.70
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 297,551.70
161 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kamper
Bahan
Kayu Kamper papan 0.01450 M3 10,900,000.00 158,050.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 159,010.00
162 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu balau
Bahan
Kayu Balau Papan 0.01450 M3 10,300,000.00 149,350.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00

57
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
27,787.50 150,310.00
163 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kempas
Bahan
Kayu Kempas Papan 0.01450 M3 8,500,000.00 123,250.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 124,210.00
164 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kruing
Bahan
Kayu Kruing Papan 0.01450 M3 8,500,000.00 123,250.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 124,210.00
165 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu meranti
Bahan
Kayu Meranti Papan 0.01450 M3 6,100,000.00 88,450.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 89,410.00
166 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.01450 M3 4,545,500.00 65,909.75
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.07500 Oh 68,000.00 5,100.00
27,787.50 66,869.75
167 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu jati
Bahan
Kayu jati papan lokal 0.00860 M3 20,454,600.00 175,909.56
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00

58
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 176,869.56
168 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kanfer
Bahan
Kayu Kamper papan 0.00860 M3 10,900,000.00 93,740.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 94,700.00
169 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu balau
Bahan
Kayu Balau Papan 0.00860 M3 10,300,000.00 88,580.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 89,540.00
170 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kempas
Bahan
Kayu Kempas Papan 0.00860 M3 8,500,000.00 73,100.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 74,060.00
171 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kruing
Bahan
Kayu Kruing Papan 0.00860 M3 8,500,000.00 73,100.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 74,060.00
172 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu meranti
Bahan
Kayu Meranti Papan 0.00860 M3 6,100,000.00 52,460.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00

59
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 53,420.00
173 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu Akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.00860 M3 4,545,500.00 39,091.30
Paku biasa 0.06000 Kg 16,000.00 960.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.05000 Oh 68,000.00 3,400.00
14,275.00 40,051.30
174 1 m2 Pasang rangka dinding pemisah kayu jati
Bahan
Kayu Jati Balok lokal 0.01950 M3 20,000,000.00 390,000.00
Kayu jati papan lokal 0.00700 M3 20,454,600.00 143,182.20
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 534,782.20
175 1 m2 Pasang rangka dinding pemisah kayu kanfer
Bahan
Kayu Kamper Balok 0.01950 M3 10,450,000.00 203,775.00
Kayu Kamper papan 0.00700 M3 10,900,000.00 76,300.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 281,675.00
176 1 m2 Pasang rangka dinding pemisah kayu balau
Bahan
Kayu Balau Balok 0.01950 M3 9,800,000.00 191,100.00
Kayu Balau Papan 0.00700 M3 10,300,000.00 72,100.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 264,800.00
177 1 m2 Pasang rangka dinding pemisah kayu kempas
Bahan
Kayu Kempas Balok 0.01950 M3 8,000,000.00 156,000.00

60
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kayu Kempas Papan 0.00700 M3 8,500,000.00 59,500.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 217,100.00
178 1 m2 Pasang rangka dinding pemisah kayu kruing
Bahan
Kayu Kruing Balok 0.01950 M3 8,000,000.00 156,000.00
Kayu Kruing Papan 0.00700 M3 8,500,000.00 59,500.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 217,100.00
179 1 m2 Pasang rangka dinding pemisah kayu meranti
Bahan
Kayu Meranti Balok 0.01950 M3 5,600,000.00 109,200.00
Kayu Meranti Papan 0.00700 M3 6,100,000.00 42,700.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 153,500.00
180 1 m2 Pasang rangka dinding pemisah kayu tahun / akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01950 M3 4,250,000.00 82,875.00
Kayu Tahun papan ( Mauni/akasia) 0.00700 M3 4,545,500.00 31,818.50
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.07500 Oh 68,000.00 5,100.00
40,537.50 116,293.50
181 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu jati
Bahan
Kayu Jati Balok lokal 0.01950 M3 20,000,000.00 390,000.00
Kayu jati papan lokal 0.00700 M3 20,454,600.00 143,182.20
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 12,000.00 6,720.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga

61
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 650,402.20
182 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kamper
Bahan
Kayu Kamper Balok 0.01950 M3 10,450,000.00 203,775.00
Kayu Kamper papan 0.00700 M3 10,900,000.00 76,300.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 12,000.00 6,720.00
Playwood ( 120 x 240 ) cm, tbl. 4 mm 1.00000 Lbr 65,000.00 65,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 353,395.00
183 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu balau
Bahan
Kayu Balau Balok 0.01950 M3 9,800,000.00 191,100.00
Kayu Balau Papan 0.00700 M3 10,300,000.00 72,100.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 12,000.00 6,720.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 380,420.00
184 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kempas
Bahan
Kayu Kempas Balok 0.01950 M3 8,000,000.00 156,000.00
Kayu Kempas Papan 0.00700 M3 8,500,000.00 59,500.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 12,000.00 6,720.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 332,720.00
185 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kruing
Bahan
Kayu Kruing Balok 0.01950 M3 8,000,000.00 156,000.00
Kayu Kruing Papan 0.00700 M3 8,500,000.00 59,500.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00

62
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Lem ( Kayu + Tembok ) 0.56000 Lt 12,000.00 6,720.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 332,720.00
186 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu meranti
Bahan
Kayu Meranti Balok 0.01950 M3 5,600,000.00 109,200.00
Kayu Meranti Papan 0.00700 M3 6,100,000.00 42,700.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 12,000.00 6,720.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 269,120.00
187 1 m2 Pasang dinding pemisah plywood rangkap, rangka Akasia
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) 0.01950 M3 4,250,000.00 82,875.00
Kayu Tahun papan ( Mauni/akasia) 0.00700 M3 4,545,500.00 31,818.50
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Lem ( Kayu + Tembok ) 0.56000 Lt 12,000.00 6,720.00
Teakwood ( 122 X 242 ) Cm 1.00000 Lbr 108,900.00 108,900.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.01000 Oh 68,000.00 680.00
47,930.00 231,913.50
188 1 m2 Pasang dinding lambriziring dari papan jati
Bahan
Kayu Jati Papan lokal 0.00700 M3 20,454,600.00 143,182.20
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 700.00 105.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 144,887.20
189 1 m2 Pasang dinding lambriziring dari papan kanfer
Bahan
Kayu Kamper Papan 0.00700 M3 10,900,000.00 76,300.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00

63
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Paku Sekrup 0.15000 Kg 700.00 105.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 78,005.00
190 1 m2 Pasang dinding lambriziring dari papan balau
Bahan
Kayu Balau Papan 0.00700 M3 10,300,000.00 72,100.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 700.00 105.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 73,805.00
191 1 m2 Pasang dinding lambriziring dari papan kempas
Bahan
Kayu Kempas Papan 0.00700 M3 8,500,000.00 59,500.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 700.00 105.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 61,205.00
192 1 m2 Pasang dinding lambriziring dari papan kruing
Bahan
Kayu Kruing Papan 0.00700 M3 8,500,000.00 59,500.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 700.00 105.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 61,205.00
193 1 m2 Pasang dinding lambriziring dari papan meranti
Bahan
Kayu Meranti Papan 0.00700 M3 6,100,000.00 42,700.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 700.00 105.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00

64
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 44,405.00
194 1 m2 Pasang dinding lambriziring dari papan akasia
Bahan
Kayu Tahun papan ( Mauni/akasia) 0.00700 M3 4,545,500.00 31,818.50
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Paku Sekrup 0.15000 Kg 700.00 105.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang kayu 1.80000 Oh 57,500.00 103,500.00
Kepala Tukang 0.18000 Oh 62,500.00 11,250.00
Mandor 0.03000 Oh 68,000.00 2,040.00
143,790.00 33,523.50
195 1 m2 Pasang plywood tebal 4 mm, untuk dinding
Bahan
Playwood ( 120 x 240 ) cm, tbl. 4 mm 0.40000 Lbr 65,000.00 26,000.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Tenaga
Pekerja / Buruh tak terlatih 0.02500 Oh 45,000.00 1,125.00
Tukang kayu 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00750 Oh 62,500.00 468.75
Mandor 0.00130 Oh 68,000.00 88.40
5,994.65 26,800.00
196 1 m’ Pasang list plafond -kayu profil
Bahan
List Eternit ( kayu ) 1.05000 M’ 3,100.00 3,255.00
Paku biasa 0.01000 kg 16,000.00 160.00
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Tukang kayu 0.05000 Oh 57,500.00 2,875.00
Kepala Tukang 0.00500 Oh 62,500.00 312.50
Mandor 0.00300 Oh 68,000.00 204.00
5,641.50 3,415.00

VII. PEKERJAAN BETON

1 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 5 Kr


Bahan
PC / Portland cement 218.00000 Kg 1,450.00 316,100.00
Pasir pasang / beton 0.52000 M3 200,000.00 104,000.00
Batu pecah 2-3 cm 0.87000 M3 260,000.00 226,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 646,300.00
2 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 6 Kr
Bahan

65
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
PC / Portland cement 197.00000 Kg 1,450.00 285,650.00
Pasir pasang / beton 0.47000 M3 200,000.00 94,000.00
Batu pecah 2-3 cm 0.94000 M3 260,000.00 244,400.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 624,050.00
3 1 m3 Membuat beton tumbuk 1 Pc : 4 Ps : 6 Kr
Bahan
PC / Portland cement 173.00000 Kg 1,450.00 250,850.00
Pasir pasang / beton 0.57000 M3 200,000.00 114,000.00
Batu pecah 2-3 cm 0.87000 M3 260,000.00 226,200.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 591,050.00
4 1 m3 Membuat beton tumbuk 1 Pc : 2 Ps : 3 Kr.
Bahan
PC / Portland cement 232.00000 Kg 1,450.00 336,400.00
Pasir pasang / beton 0.52000 M3 200,000.00 104,000.00
Batu pecah 2-3 cm 0.78000 M3 260,000.00 202,800.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 643,200.00
5 1 m2 Membuat lantai kerja beton tumbuk 1 Pc : 3 Ps : 5 Kr, tebal 5 cm
Bahan
PC / Portland cement 10.00000 Kg 1,450.00 14,500.00
Pasir pasang / beton 0.02600 M3 200,000.00 5,200.00
Batu pecah 2-3 cm 0.04400 M3 260,000.00 11,440.00
Tenaga
Pekerja / Buruh tak terlatih 1.15000 Oh 45,000.00 51,750.00
Tukang batu 0.02000 Oh 57,500.00 1,150.00
Kepala Tukang 0.00200 Oh 62,500.00 125.00
Mandor 0.00600 Oh 68,000.00 408.00
53,433.00 31,140.00
6 1 m3 Membuat beton dengan mutu K 225
Bahan
PC / Portland cement 388.00000 Kg 1,450.00 562,600.00
Pasir pasang / beton 0.65000 M3 200,000.00 130,000.00
Batu pecah 2-3 cm 0.65000 M3 260,000.00 169,000.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00

66
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tukang batu 1.00000 Oh 57,500.00 57,500.00
Kepala Tukang 0.10000 Oh 62,500.00 6,250.00
Mandor 0.30000 Oh 68,000.00 20,400.00
354,150.00 861,600.00
7 1 m3 Membuat beton dengan mutu K 275
Bahan
PC / Portland cement 400.00000 Kg 1,450.00 580,000.00
Pasir pasang / beton 0.40000 M3 200,000.00 80,000.00
Batu pecah 2-3 cm 0.82000 M3 260,000.00 213,200.00
Tenaga
Pekerja / Buruh tak terlatih 6.00000 Oh 45,000.00 270,000.00
Tukang batu 1.00000 Oh 57,500.00 57,500.00
Kepala Tukang 0.10000 Oh 62,500.00 6,250.00
Mandor 0.30000 Oh 68,000.00 20,400.00
354,150.00 873,200.00
8 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 4 Kr.
Bahan
PC / Portland cement 280.00000 Kg 1,450.00 406,000.00
Pasir pasang / beton 0.45000 M3 200,000.00 90,000.00
Batu pecah 2-3 cm 0.90000 M3 260,000.00 234,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 730,000.00
9 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 2,5 Kr.
Bahan
PC / Portland cement 352.00000 Kg 1,450.00 510,400.00
Pasir pasang / beton 0.56000 M3 200,000.00 112,000.00
Batu pecah 2-3 cm 0.70000 M3 260,000.00 182,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 804,400.00
10 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 3 Kr.
Bahan
PC / Portland cement 357.00000 Kg 1,450.00 517,650.00
Pasir pasang / beton 0.42000 M3 200,000.00 84,000.00
Batu pecah 2-3 cm 0.54000 M3 260,000.00 140,400.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 742,050.00
11 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 2,5 Kr.

67
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
PC / Portland cement 386.00000 Kg 1,450.00 559,700.00
Pasir pasang / beton 0.47000 M3 200,000.00 94,000.00
Batu pecah 2-3 cm 0.78000 M3 260,000.00 202,800.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 856,500.00
12 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 2 Kr.
Bahan
PC / Portland cement 479.00000 Kg 1,450.00 694,550.00
Pasir pasang / beton 0.37000 M3 200,000.00 74,000.00
Batu pecah 2-3 cm 0.74000 M3 260,000.00 192,400.00
Tenaga
Pekerja / Buruh tak terlatih 1.65000 Oh 45,000.00 74,250.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.08000 Oh 68,000.00 5,440.00
95,627.50 960,950.00
13 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr.
Bahan
PC / Portland cement 336.00000 Kg 1,450.00 487,200.00
Pasir pasang / beton 0.54000 M3 200,000.00 108,000.00
Batu pecah 2-3 cm 0.81000 M3 260,000.00 210,600.00
Tenaga
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 1.00000 Oh 68,000.00 68,000.00
180,312.50 805,800.00
14 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 4 split
Bahan
PC / Portland cement 291.00000 Kg 1,450.00 421,950.00
Pasir pasang / beton 0.47000 M3 200,000.00 94,000.00
Batu pecah 2-3 cm 0.93000 M3 260,000.00 241,800.00
Tenaga
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 1.00000 Oh 68,000.00 68,000.00
180,312.50 757,750.00
15 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 3 split
Bahan
PC / Portland cement 367.00000 Kg 1,450.00 532,150.00
Pasir pasang / beton 0.44000 M3 200,000.00 88,000.00
Batu pecah 2-3 cm 0.88000 M3 260,000.00 228,800.00
Tenaga

68
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 1.00000 Oh 68,000.00 68,000.00
180,312.50 848,950.00
16 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 2,5 split
Bahan
PC / Portland cement 400.00000 Kg 1,450.00 580,000.00
Pasir pasang / beton 0.48000 M3 200,000.00 96,000.00
Batu pecah 2-3 cm 0.80000 M3 260,000.00 208,000.00
Tenaga #N/A
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 1.00000 Oh 68,000.00 68,000.00
180,312.50 884,000.00
17 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 1 Kr.
Bahan
PC / Portland cement 615.00000 Kg 1,450.00 891,750.00
Pasir pasang / beton 0.52000 M3 200,000.00 104,000.00
Batu pecah 2-3 cm 0.52000 M3 260,000.00 135,200.00
Tenaga
Pekerja / Buruh tak terlatih 2.00000 Oh 45,000.00 90,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 1.00000 Oh 68,000.00 68,000.00
180,312.50 1,130,950.00
18 1 Kg Pembesian dengan besi polos atau besi ulir
Bahan
Besi Beton / tulangan beton 1.05000 Kg 11,000.00 11,550.00
Kawat Beton / bendraat 0.01500 Kg 16,400.00 246.00
Tenaga
Pekerja / Buruh tak terlatih 0.00700 Oh 45,000.00 315.00
Tukang besi 0.00700 Oh 57,500.00 402.50
Kepala Tukang 0.00070 Oh 62,500.00 43.75
Mandor 0.00030 Oh 68,000.00 20.40
781.65 11,796.00
19 1 m2 Pasang bekisting untuk pondasi
Bahan
Kayu bekisting 0.04000 M3 2,600,000.00 104,000.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Minyak bekisting 0.10000 Lt 5,000.00 500.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang kayu 0.26000 Oh 57,500.00 14,950.00
Kepala Tukang 0.02600 Oh 62,500.00 1,625.00
Mandor 0.00500 Oh 68,000.00 340.00
30,415.00 109,300.00
20 1 m2 Pasang bekisting untuk sloof

69
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
Kayu bekisting 0.04500 M3 2,600,000.00 117,000.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
Minyak bekisting 0.10000 Lt 5,000.00 500.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang kayu 0.26000 Oh 57,500.00 14,950.00
Kepala Tukang 0.02600 Oh 62,500.00 1,625.00
Mandor 0.00500 Oh 68,000.00 340.00
30,415.00 122,300.00
21 1 m2 Pasang bekisting untuk kolom
Bahan
Kayu bekisting 0.04000 M3 2,600,000.00 104,000.00
Paku biasa 0.40000 Kg 16,000.00 6,400.00
Minyak bekisting 0.20000 Lt 5,000.00 1,000.00
Kayu bekisting 0.01500 M3 2,600,000.00 39,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 0.35000 Lbr 133,000.00 46,550.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 2.00000 Btg 21,000.00 42,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Tukang kayu 0.33000 Oh 57,500.00 18,975.00
Kepala Tukang 0.03300 Oh 62,500.00 2,062.50
Mandor 0.00600 Oh 68,000.00 408.00
34,945.50 238,950.00
22 1 m2 Pasang bekisting untuk balok
Bahan
Kayu bekisting 0.04000 M3 2,600,000.00 104,000.00
Paku biasa 0.40000 Kg 16,000.00 6,400.00
Minyak bekisting 0.20000 Lt 5,000.00 1,000.00
Kayu bekisting 0.01800 M3 2,600,000.00 46,800.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 0.35000 Lbr 133,000.00 46,550.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 2.00000 Btg 21,000.00 42,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang kayu 0.33000 Oh 57,500.00 18,975.00
Kepala Tukang 0.03300 Oh 62,500.00 2,062.50
Mandor 0.00600 Oh 68,000.00 408.00
35,845.50 246,750.00
23 1 m2 Pasang bekisting untuk lantai
Bahan
Kayu bekisting 0.04000 M3 2,600,000.00 104,000.00
Paku biasa 0.40000 Kg 16,000.00 6,400.00
Minyak bekisting 0.20000 Lt 5,000.00 1,000.00
Kayu bekisting 0.01500 M3 2,600,000.00 39,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 0.35000 Lbr 133,000.00 46,550.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 6.00000 Btg 21,000.00 126,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang kayu 0.33000 Oh 57,500.00 18,975.00

70
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.03300 Oh 62,500.00 2,062.50
Mandor 0.00600 Oh 68,000.00 408.00
35,845.50 322,950.00
24 1 m2 Pasang bekisting untuk tangga
Bahan
Kayu bekisting 0.03000 M3 2,600,000.00 78,000.00
Paku biasa 0.40000 Kg 16,000.00 6,400.00
Minyak bekisting 0.15000 Lt 5,000.00 750.00
Kayu bekisting 0.01500 M3 2,600,000.00 39,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 0.35000 Lbr 133,000.00 46,550.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 2.00000 Btg 21,000.00 42,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.32000 Oh 45,000.00 14,400.00
Tukang kayu 0.33000 Oh 57,500.00 18,975.00
Kepala Tukang 0.03300 Oh 62,500.00 2,062.50
Mandor 0.00600 Oh 68,000.00 408.00
35,845.50 212,700.00
25 1 m2 Pasang jembatan cor
Bahan
Kayu bekisting 0.02860 M3 2,600,000.00 74,360.00
Paku biasa 0.60000 Kg 16,000.00 9,600.00
Bambu dia 6 - 8 cm, panjang 6 m 0.50000 Btg 12,500.00 6,250.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang kayu 0.05000 Oh 57,500.00 2,875.00
Kepala Tukang 0.00500 Oh 62,500.00 312.50
Mandor 0.00700 Oh 68,000.00 476.00
10,413.50 90,210.00
26 1 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting).
Bahan
Kayu bekisting 0.20000 M3 2,600,000.00 520,000.00
Paku biasa 1.50000 Kg 16,000.00 24,000.00
Minyak bekisting 0.40000 Lt 5,000.00 2,000.00
Besi Beton / tulangan beton 150.00000 Kg 11,000.00 1,650,000.00
Kawat Beton / bendraat 2.25000 Kg 16,400.00 36,900.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 200,000.00 104,000.00
Batu pecah 2-3 cm 0.78000 M3 260,000.00 202,800.00
Tenaga
Pekerja / Buruh tak terlatih 3.90000 Oh 45,000.00 175,500.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 1.04000 Oh 57,500.00 59,800.00
Tukang besi 1.05000 Oh 57,500.00 60,375.00
Kepala Tukang 0.24500 Oh 62,500.00 15,312.50
Mandor 0.16500 Oh 68,000.00 11,220.00
342,332.50 3,008,050.00
27 1 m3 Membuat sloof beton bertulang (200 kg besi + bekisting).
Bahan
Kayu bekisting 0.27000 M3 2,600,000.00 702,000.00

71
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Paku biasa 2.00000 Kg 16,000.00 32,000.00
Minyak bekisting 0.60000 Lt 5,000.00 3,000.00
Besi Beton / tulangan beton 200.00000 Kg 11,000.00 2,200,000.00
Kawat Beton / bendraat 3.00000 Kg 16,400.00 49,200.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 200,000.00 104,000.00
Batu pecah 2-3 cm 0.78000 M3 260,000.00 202,800.00
Tenaga
Pekerja / Buruh tak terlatih 4.85000 Oh 45,000.00 218,250.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 1.56000 Oh 57,500.00 89,700.00
Tukang besi 1.40000 Oh 57,500.00 80,500.00
Kepala Tukang 0.33100 Oh 62,500.00 20,687.50
Mandor 0.17000 Oh 68,000.00 11,560.00
440,822.50 3,761,350.00
28 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting).
Bahan
Kayu bekisting 0.40000 M3 2,600,000.00 1,040,000.00
Paku biasa 4.00000 Kg 16,000.00 64,000.00
Minyak bekisting 2.00000 Lt 5,000.00 10,000.00
Besi Beton / tulangan beton 300.00000 Kg 11,000.00 3,300,000.00
Kawat Beton / bendraat 4.50000 Kg 16,400.00 73,800.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 200,000.00 104,000.00
Batu pecah 2-3 cm 0.78000 M3 260,000.00 202,800.00
Kayu bekisting 0.15000 M3 2,600,000.00 390,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 3.50000 Lbr 133,000.00 465,500.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 20.00000 Btg 21,000.00 420,000.00
Tenaga
Pekerja / Buruh tak terlatih 7.30000 Oh 45,000.00 328,500.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 3.30000 Oh 57,500.00 189,750.00
Tukang besi 2.10000 Oh 57,500.00 120,750.00
Kepala Tukang 0.57000 Oh 62,500.00 35,625.00
Mandor 0.25000 Oh 68,000.00 17,000.00
711,750.00 6,538,450.00
29 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting).
Bahan
Kayu bekisting 0.32000 M3 2,600,000.00 832,000.00
Paku biasa 3.20000 Kg 16,000.00 51,200.00
Minyak bekisting 1.60000 Lt 5,000.00 8,000.00
Besi Beton / tulangan beton 200.00000 Kg 11,000.00 2,200,000.00
Kawat Beton / bendraat 3.00000 Kg 16,400.00 49,200.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 200,000.00 104,000.00
Batu pecah 2-3 cm 0.78000 M3 260,000.00 202,800.00
Kayu bekisting 0.14000 M3 2,600,000.00 364,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 2.80000 Lbr 133,000.00 372,400.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 16.00000 Btg 21,000.00 336,000.00

72
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 5.96000 Oh 45,000.00 268,200.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 2.80000 Oh 57,500.00 161,000.00
Tukang besi 1.40000 Oh 57,500.00 80,500.00
Kepala Tukang 0.45500 Oh 62,500.00 28,437.50
Mandor 0.20800 Oh 68,000.00 14,144.00
572,406.50 4,987,950.00
30 1 m3 Membuat balok beton bertulang (150 kg besi + bekisting).
Bahan
Kayu bekisting 0.32000 M3 2,600,000.00 832,000.00
Paku biasa 3.20000 Kg 16,000.00 51,200.00
Minyak bekisting 1.60000 Lt 5,000.00 8,000.00
Besi Beton / tulangan beton 150.00000 Kg 11,000.00 1,650,000.00
Kawat Beton / bendraat 2.25000 Kg 16,400.00 36,900.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 200,000.00 104,000.00
Batu pecah 2-3 cm 0.78000 M3 260,000.00 202,800.00
Kayu bekisting 0.12000 M3 2,600,000.00 312,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 2.80000 Lbr 133,000.00 372,400.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 32.00000 Btg 21,000.00 672,000.00
Tenaga
Pekerja / Buruh tak terlatih 5.80000 Oh 45,000.00 261,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 2.80000 Oh 57,500.00 161,000.00
Tukang besi 1.05000 Oh 57,500.00 60,375.00
Kepala Tukang 0.42000 Oh 62,500.00 26,250.00
Mandor 0.18500 Oh 68,000.00 12,580.00
541,330.00 4,709,650.00
31 1 m3 Membuat dinding beton bertulang (150 kg besi + bekisting).
Bahan
Kayu bekisting 0.24000 M3 2,600,000.00 624,000.00
Paku biasa 3.20000 Kg 16,000.00 51,200.00
Minyak bekisting 1.60000 Lt 5,000.00 8,000.00
Besi Beton / tulangan beton 150.00000 Kg 11,000.00 1,650,000.00
Kawat Beton / bendraat 2.25000 Kg 16,400.00 36,900.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 200,000.00 104,000.00
Batu pecah 2-3 cm 0.78000 M3 260,000.00 202,800.00
Kayu bekisting 0.16000 M3 2,600,000.00 416,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 2.80000 Lbr 133,000.00 372,400.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 24.00000 Btg 21,000.00 504,000.00
Tenaga
Pekerja / Buruh tak terlatih 5.60000 Oh 45,000.00 252,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 2.64000 Oh 57,500.00 151,800.00
Tukang besi 1.05000 Oh 57,500.00 60,375.00
Kepala Tukang 0.40000 Oh 62,500.00 25,000.00
Mandor 0.19300 Oh 68,000.00 13,124.00

73
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
522,424.00 4,437,650.00
32 1 m3 Membuat tangga beton bertulang (200 kg besi + bekisting).
Bahan
Kayu bekisting 0.25000 M3 2,600,000.00 650,000.00
Paku biasa 3.00000 Kg 16,000.00 48,000.00
Minyak bekisting 1.20000 Lt 5,000.00 6,000.00
Besi Beton / tulangan beton 200.00000 Kg 11,000.00 2,200,000.00
Kawat Beton / bendraat 3.00000 Kg 16,400.00 49,200.00
PC / Portland cement 323.00000 Kg 1,450.00 468,350.00
Pasir pasang / beton 0.52000 M3 200,000.00 104,000.00
Batu pecah 2-3 cm 0.78000 M3 260,000.00 202,800.00
Kayu bekisting 0.10500 M3 2,600,000.00 273,000.00
Multiplek 9 mm, uk. 1,20 x 2,40 m 2.50000 Lbr 133,000.00 332,500.00
Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting 14.00000 Btg 21,000.00 294,000.00
Tenaga
Pekerja / Buruh tak terlatih 5.60000 Oh 45,000.00 252,000.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Tukang kayu 2.30000 Oh 57,500.00 132,250.00
Tukang besi 1.40000 Oh 57,500.00 80,500.00
Kepala Tukang 0.40500 Oh 62,500.00 25,312.50
Mandor 0.20200 Oh 68,000.00 13,736.00
523,923.50 4,627,850.00
33 1 m’ Membuat kolom penguat beton bertulang (11 x 11) cm.
Bahan
Kayu bekisting 0.00200 M3 2,600,000.00 5,200.00
Paku biasa 0.01000 Kg 16,000.00 160.00
Besi Beton / tulangan beton 3.00000 Kg 11,000.00 33,000.00
Kawat Beton / bendraat 0.45000 Kg 16,400.00 7,380.00
PC / Portland cement 4.00000 Kg 1,450.00 5,800.00
Pasir pasang / beton 0.00600 M3 200,000.00 1,200.00
Batu pecah 2-3 cm 0.00900 M3 260,000.00 2,340.00
Tenaga
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Tukang batu 0.02000 Oh 57,500.00 1,150.00
Tukang kayu 0.02000 Oh 57,500.00 1,150.00
Tukang besi 0.02000 Oh 57,500.00 1,150.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00300 Oh 68,000.00 204.00
6,729.00 55,080.00
34 1 m’ Membuat ring balok beton bertulang (10 x 15) cm.
Bahan
Kayu bekisting 0.00300 M3 2,600,000.00 7,800.00
Paku biasa 0.02000 Kg 16,000.00 320.00
Besi Beton / tulangan beton 3.60000 Kg 11,000.00 39,600.00
Kawat Beton / bendraat 0.05000 Kg 16,400.00 820.00
PC / Portland cement 5.50000 Kg 1,450.00 7,975.00
Pasir pasang / beton 0.00900 M3 200,000.00 1,800.00
Batu pecah 2-3 cm 0.01500 M3 260,000.00 3,900.00
Tenaga

74
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang batu 0.03300 Oh 57,500.00 1,897.50
Tukang kayu 0.03300 Oh 57,500.00 1,897.50
Tukang besi 0.03300 Oh 57,500.00 1,897.50
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
11,157.50 62,215.00
35 1 m3 Membuat Bekisting
Tenaga :
Tukang kayu 0.26000 Oh 57,500.00 14,950.00
Kepala Tukang 0.02600 Oh 62,500.00 1,625.00
Pekerja / Buruh tak terlatih 0.30000 Oh 45,000.00 13,500.00
Mandor 0.00500 Oh 68,000.00 340.00
Bahan :
Kayu bekisting 0.04500 M3 2,600,000.00 117,000.00
Paku biasa 0.30000 Kg 16,000.00 4,800.00
30,415.00 121,800.00
36 1 m3 Membongkar bekisting dan perawatan beton
Tenaga :
Pekerja / Buruh tak terlatih 4.00000 Oh 45,000.00 180,000.00
180,000.00

VIII. PEKERJAAN PENUTUP ATAP

1 1 m2 Pasang atap genteng press biasa


Bahan
Genteng pres biasa 25.00000 Buah 1,400.00 35,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00800 Oh 62,500.00 500.00
Mandor 0.00800 Oh 68,000.00 544.00
12,106.50 35,000.00
2 1 m2 Pasang atap genteng MKP lokal
Bahan
Genteng MKP 25.00000 Bh 1,600.00 40,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00800 Oh 62,500.00 500.00
Mandor 0.00800 Oh 68,000.00 544.00
12,106.50 40,000.00
3 1 m2 Pasang atap genteng Mantili
Bahan
Genteng mantili 22.00000 Bh 1,700.00 37,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00800 Oh 62,500.00 500.00

75
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00800 Oh 68,000.00 544.00
12,106.50 37,400.00
4 1 m’ Pasang bubung genteng MKP Lokal
Bahan
Genteng Bubung MKP 5.00000 Buah 4,500.00 22,500.00
PC / Portland cement 8.00000 Kg 1,450.00 11,600.00
Pasir pasang / beton 0.03200 M3 200,000.00 6,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00200 Oh 68,000.00 136.00
30,886.00 40,500.00
5 1 m2 Pasang atap asbes gelombang besar (3,00 x 1,05 m) x 4 mm
Bahan
Asbes Gelombang Besar Uk. 300 x 105 x0,4 Cm 0.35000 Lbr 67,000.00 23,450.00
Paku Asbes 0.12000 Kg 37,000.00 4,440.00
Tenaga
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00700 Oh 68,000.00 476.00
11,238.50 27,890.00
6 1 m2 Pasang atap asbes gelombang kecil (1,80 x 1,05 m) x 4 mm
Bahan
Asbes Gelombang Kecil Uk. 1.80 x 105 x0,4 Cm 0.51000 Lbr 42,000.00 21,420.00
Paku Asbes 0.12000 Kg 37,000.00 4,440.00
Tenaga
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Tukang batu 0.06700 Oh 57,500.00 3,852.50
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00700 Oh 68,000.00 476.00
11,066.00 25,860.00
7 1 m’ Pasang bubung stel gelombang besar
Bahan
Bubung asbes gel besar ( Ardek 1Stel 2 Lmbr ) 0.55000 Lbr 47,000.00 25,850.00
Paku Asbes 0.12000 Bh 37,000.00 4,440.00
Tenaga
Pekerja / Buruh tak terlatih 0.08400 Oh 45,000.00 3,780.00
Tukang batu 0.12500 Oh 57,500.00 7,187.50
Kepala Tukang 0.01300 Oh 62,500.00 812.50
Mandor 0.00400 Oh 68,000.00 272.00
12,052.00 30,290.00
8 1 m’ Pasang bubung stel gelombang kecil
Bahan
Bubung asbes gel kecil ( Ardek 1Stel 2 Lmbr ) 0.55000 Lbr 30,000.00 16,500.00
Paku Asbes 0.12000 Buah 37,000.00 4,440.00
Tenaga
Pekerja / Buruh tak terlatih 0.08400 Oh 45,000.00 3,780.00

76
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tukang batu 0.12500 Oh 57,500.00 7,187.50
Kepala Tukang 0.01300 Oh 62,500.00 812.50
Mandor 0.00400 Oh 68,000.00 272.00
12,052.00 20,940.00
9 1 m2 Pasang atap genteng beton
Bahan
Genteng Beton 11.00000 Bh 3,800.00 41,800.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.01000 Oh 68,000.00 680.00
16,055.00 42,280.00
10 1 m2 Pasang atap genteng metal
Bahan
Genteng Metal 1.02000 Lbr 120,000.00 122,400.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00100 Oh 68,000.00 68.00
15,443.00 125,600.00
11 1 m2 Pasang atap sirap
Bahan
Atap Sirap ( Kayu Ulin ) 60.00000 Bh 2,000.00 120,000.00
Paku biasa 0.20000 Kg 16,000.00 3,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.16600 Oh 45,000.00 7,470.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00800 Oh 68,000.00 544.00
23,951.50 123,200.00
12 1 m’ Pasang nok genteng beton
Bahan
Genteng bubung beton 3.50000 Buah 6,700.00 23,450.00
Paku biasa 0.05000 Kg 16,000.00 800.00
PC / Portland cement 10.80000 Kg 1,450.00 15,660.00
Pasir pasang / beton 0.03200 M3 200,000.00 6,400.00
Semen Putih / warna 1.00000 Kg 2,000.00 2,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Tukang batu 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.02000 Oh 68,000.00 1,360.00
32,110.00 48,310.00
13 1 m’ Pasang nok sirap
Bahan

77
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Seng Plat BJLS 30 lebar 0,90 m 0.40000 Lbr 42,000.00 16,800.00
Paku biasa 0.06000 Kg 16,000.00 960.00
Paku biasa 0.05000 Kg 16,000.00 800.00
Kayu Meranti Papan 0.00400 M3 6,100,000.00 24,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.12500 Oh 45,000.00 5,625.00
Tukang batu 0.25000 Oh 57,500.00 14,375.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00600 Oh 68,000.00 408.00
21,970.50 42,960.00
14 1 m2 Pasang atap seng gelombang
Bahan
Seng Gelombang Bjls 30 uk 180 x 90 x 0,03Cm 0.70000 Lbr 67,000.00 46,900.00
Paku Seng ( Paku payung ) 0.02000 Kg 31,000.00 620.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00600 Oh 68,000.00 408.00
9,633.00 47,520.00
15 1 m2 Pasang atap nok seng
Bahan
Seng Plat BJLS 30 lebar 0,90 m 0.30000 Lbr 42,000.00 12,600.00
Paku Seng ( Paku payung ) 0.04000 Kg 31,000.00 1,240.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00800 Oh 68,000.00 544.00
11,756.50 13,840.00
16 1 m2 Pasang aluminium foil / sisalation
Bahan
Alumunium foil 1.05000 M2 10,000.00 10,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Tukang batu 0.05000 Oh 57,500.00 2,875.00
Kepala Tukang 0.00500 Oh 62,500.00 312.50
Mandor 0.00800 Oh 68,000.00 544.00
10,481.50 10,500.00
IX. PEKERJAAN LANGIT - LANGIT

1 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 4 mm


Bahan
Eternit polos (Asbes) 1.10000 Lbr 9,700.00 10,670.00
Paku biasa 0.01000 Kg 16,000.00 160.00
Tenaga
Pekerja / Buruh tak terlatih 0.03000 Oh 45,000.00 1,350.00
Tukang kayu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50

78
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00150 Oh 68,000.00 102.00
5,914.50 10,830.00
2 1 m2 Langit-langit plywood (30 x 60) cm, tebal 4 mm
Bahan
Playwood ( 120 x 240 ) cm, tbl. 4 mm 0.36000 Lbr 65,000.00 23,400.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Tenaga
Pekerja / Buruh tak terlatih 0.07000 Oh 45,000.00 3,150.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00350 Oh 68,000.00 238.00
9,763.00 23,880.00
3 1 m2 Langit-langit teakwood (30 x 60) cm, tebal 4 mm
Bahan
Teakwood ( 122 X 242 ) Cm 0.36000 Lbr 108,900.00 39,204.00
Paku biasa 0.03000 Kg 16,000.00 480.00
Tenaga
Pekerja / Buruh tak terlatih 0.07000 Oh 45,000.00 3,150.00
Tukang kayu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00350 Oh 68,000.00 238.00
9,763.00 39,684.00
4 1 m2 Langit-langit gypsum board, tebal 9 mm
Bahan
Gypsum board ( 1,2 x 2,4 m ) 0.36400 Lbr 70,000.00 25,480.00
Paku Gypsum 0.11000 Kg 23,000.00 2,530.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Tukang kayu 0.05000 Oh 57,500.00 2,875.00
Kepala Tukang 0.00500 Oh 62,500.00 312.50
Mandor 0.00500 Oh 68,000.00 340.00
8,027.50 28,010.00
5 1 m' List Plafond Gypsum Kecil
Tenaga :
Tukang kayu 0.02100 Oh 57,500.00 1,207.50
Kepala Tukang 0.00200 Oh 62,500.00 125.00
Pekerja / Buruh tak terlatih 0.02100 Oh 45,000.00 945.00
Mandor 0.00100 Oh 68,000.00 68.00
Bahan :
List Profil kecil ( gypsum ) 1.05000 M' 17,000.00 17,850.00
Plamur Tembok 0.20000 Kg 9,800.00 1,960.00
2,345.50 19,810.00
6 1 m' List Plafond Gypsum Besar
Tenaga :
Tukang kayu 0.02100 Kg 57,500.00 1,207.50
Kepala Tukang 0.00200 Oh 62,500.00 125.00
Pekerja / Buruh tak terlatih 0.02100 Oh 45,000.00 945.00
Mandor 0.00100 Oh 68,000.00 68.00
Bahan :

79
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
List Profil besar ( gypsum ) 1.05000 M' 27,000.00 28,350.00
Plamur Tembok 0.20000 Kg 9,800.00 1,960.00
2,345.50 30,310.00

X. PEKERJAAN SANITASI

1 1 bh Memasang kloset duduk/monoblok


Bahan
Kloset Monoblok Lokal 1.00000 Bh 975,000.00 975,000.00
Perlengkapan 0.06000 Hrg. bh 975,000.00 58,500.00
Tenaga
Pekerja / Buruh tak terlatih 3.30000 Oh 45,000.00 148,500.00
Tukang batu 1.10000 Oh 57,500.00 63,250.00
Kepala Tukang 0.00100 Oh 62,500.00 62.50
Mandor 0.16000 Oh 68,000.00 10,880.00
222,692.50 1,033,500.00
2 1 bh Memasang kloset duduk keramik
Bahan :
Kloset Duduk Keramik 1.00000 Bh 350,000.00 350,000.00
Perlengkapan 0.06000 Hrg. bh 350,000.00 21,000.00
Tenaga :
Pekerja / Buruh tak terlatih 3.30000 Oh 45,000.00 148,500.00
Tukang batu 1.10000 Oh 57,500.00 63,250.00
Kepala Tukang 0.00100 Oh 62,500.00 62.50
Mandor 0.16000 Oh 68,000.00 10,880.00
222,692.50 371,000.00
3 1 bh Memasang kloset jongkok porselen
Bahan
Kloset Jongkok Keramik 1.00000 Bh 105,000.00 105,000.00
PC / Portland cement 6.00000 Kg 1,450.00 8,700.00
Pasir pasang / beton 0.01000 M3 200,000.00 2,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang batu 1.50000 Oh 57,500.00 86,250.00
Kepala Tukang 1.50000 Oh 62,500.00 93,750.00
Mandor 0.16000 Oh 68,000.00 10,880.00
235,880.00 115,700.00
4 1 bh Memasang kloset jongkok teraso
Bahan
Kloset Jongkok teraso 1.00000 Bh 75,000.00 75,000.00
Batu Bata / Merah 7.00000 Bh 700.00 4,900.00
PC / Portland cement 6.00000 Kg 1,450.00 8,700.00
Pasir pasang / beton 0.01000 M3 200,000.00 2,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang batu 1.50000 Oh 57,500.00 86,250.00
Kepala Tukang 0.30000 OH 62,500.00 18,750.00
Mandor 0.11000 Oh 68,000.00 7,480.00
157,480.00 90,600.00

80
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
5 1 bh Memasang urinoir
Bahan
Urinoir 1.00000 Bh 280,000.00 280,000.00
Perlengkapan 0.30000 Hrg.bh 280,000.00 84,000.00
PC / Portland cement 6.00000 Kg 1,450.00 8,700.00
Pasir pasang / beton 0.01000 M3 200,000.00 2,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.00000 Oh 45,000.00 45,000.00
Tukang batu 1.00000 Oh 57,500.00 57,500.00
Kepala Tukang 0.10000 Oh 62,500.00 6,250.00
Mandor 0.10000 Oh 68,000.00 6,800.00
115,550.00 374,700.00
6 1 bh Memasang wastafel
Bahan
Bak Cuci Tangan Wastafel 1.00000 Bh 230,000.00 230,000.00
Perlengkapan 0.12000 Hrg.bh 230,000.00 27,600.00
PC / Portland cement 6.00000 Kg 1,450.00 8,700.00
Pasir pasang / beton 0.01000 M3 200,000.00 2,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.20000 Oh 45,000.00 54,000.00
Tukang batu 1.45000 Oh 57,500.00 83,375.00
Kepala Tukang 0.15000 Oh 62,500.00 9,375.00
Mandor 0.10000 Oh 68,000.00 6,800.00
153,550.00 268,300.00
7 1 bh Memasang bak mandi teraso volume 0,30 m3
Bahan
Bak mandi teraso volume 0.3 m3 1.00000 Bh 170,000.00 170,000.00
PC / Portland cement 6.00000 Kg 1,450.00 8,700.00
Pasir pasang / beton 0.01000 M3 200,000.00 2,000.00
Tenaga
Pekerja / Buruh tak terlatih 2.10000 Oh 45,000.00 94,500.00
Tukang batu 0.75000 Oh 57,500.00 43,125.00
Kepala Tukang 0.07000 Oh 62,500.00 4,375.00
Mandor 0.11000 Oh 68,000.00 7,480.00
149,480.00 180,700.00
8 1 bh Memasang bak mandi Fibreglass volume 0,30 m3
Bahan
Bak Mandi Fiber glass, 0.3 m3 1.00000 1 Bh 70,000.00 70,000.00
Perlengkapan 0.18000 Hrg.bh 70,000.00 12,600.00
Tenaga
Pekerja / Buruh tak terlatih 1.80000 Oh 45,000.00 81,000.00
Tukang batu 2.70000 Oh 57,500.00 155,250.00
Kepala Tukang 0.54000 Oh 62,500.00 33,750.00
Mandor 0.11000 Oh 68,000.00 7,480.00
277,480.00 82,600.00
9 1 bh Memasang badkip porselen
Bahan
Bak Kip 1.00000 Bh 1,300,000.00 1,300,000.00
Perlengkapan 0.20000 Hr, bh 1,300,000.00 260,000.00

81
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.00750 Oh 45,000.00 337.50
Tukang batu 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00750 Oh 62,500.00 468.75
Mandor 0.00380 Oh 68,000.00 258.40
5,377.15 1,560,000.00
10 1 bh Memasang bak fibreglass volume 1 m3 air
Bahan
Bak Mandi Fiber glass, 1.00 m x 1.00 m 1.00000 Bh 220,000.00 220,000.00
harga
Perlengkapan 0.12000 220,000.00 26,400.00
bak
Tenaga
Pekerja / Buruh tak terlatih 3.00000 Oh 45,000.00 135,000.00
Tukang batu 4.50000 Oh 57,500.00 258,750.00
Kepala Tukang 0.90000 Oh 62,500.00 56,250.00
Mandor 0.90000 Oh 68,000.00 61,200.00
511,200.00 246,400.00
11 1 m' Memasang pipa beton, diameter 15 cm - 20cm
Bahan
Buis Beton ø 20 Cm 1.10000 Bh 31,900.00 35,090.00
Batu Bata / Merah 45.00000 bh 700.00 31,500.00
PC / Portland cement 3.92000 Kg 1,450.00 5,684.00
Pasir pasang / beton 0.05600 M3 200,000.00 11,200.00
Pasir Urug 0.02400 M3 77,300.00 1,855.20
Tenaga
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Mandor 0.00700 Oh 68,000.00 476.00
11,238.50 85,329.20
12 1 m' Memasang pipa beton, diameter 30 cm
Bahan
Buis Beton ø 30 Cm 1.10000 Bh 47,500.00 52,250.00
Batu Bata / Merah 45.00000 bh 700.00 31,500.00
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 200,000.00 12,200.00
Pasir Urug 0.06900 M3 77,300.00 5,333.70
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 116,218.70
13 1 m' Memasang pipa beton, diameter 40 cm
Bahan
Buis Beton ø 40 Cm 1.10000 Bh 55,000.00 60,500.00
Batu Bata / Merah 45.00000 bh 700.00 31,500.00
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 200,000.00 12,200.00
Pasir Urug 0.06900 M3 77,300.00 5,333.70

82
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 124,468.70
14 1 m' Memasang pipa beton, diameter 50 cm
Bahan
Buis Beton ø 50 Cm 1.10000 Bh 80,000.00 88,000.00
Batu Bata / Merah 45.00000 bh 700.00 31,500.00
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 200,000.00 12,200.00
Pasir Urug 0.06900 M3 77,300.00 5,333.70
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 151,968.70
15 1 m' Memasang pipa beton, diameter 60 cm
Bahan
Buis Beton ø 60 Cm 1.10000 Bh 90,000.00 99,000.00
Batu Bata / Merah 45.00000 bh 700.00 31,500.00
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 200,000.00 12,200.00
Pasir Urug 0.06900 M3 77,300.00 5,333.70
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 162,968.70
16 1 m' Memasang pipa beton, diameter 80 cm
Bahan
Buis Beton ø 80 Cm 1.10000 Bh 115,000.00 126,500.00
Batu Bata / Merah 45.00000 bh 700.00 31,500.00
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 200,000.00 12,200.00
Pasir Urug 0.06900 M3 77,300.00 5,333.70
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 190,468.70
17 1 m' Memasang pipa beton, diameter 100 cm
Bahan
Buis Beton ø 100 Cm 1.10000 Bh 204,600.00 225,060.00
Batu Bata / Merah 45.00000 bh 700.00 31,500.00

83
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
PC / Portland cement 10.30000 Kg 1,450.00 14,935.00
Pasir pasang / beton 0.06100 M3 200,000.00 12,200.00
Pasir Urug 0.06900 M3 77,300.00 5,333.70
Tenaga
Pekerja / Buruh tak terlatih 0.38000 Oh 45,000.00 17,100.00
Tukang batu 0.19000 Oh 57,500.00 10,925.00
Kepala Tukang 0.01900 Oh 62,500.00 1,187.50
Mandor 0.01900 Oh 68,000.00 1,292.00
30,504.50 289,028.70
18 1 bh Memasang bak kontrol pasangan batu bata ukuran (30 x30) cm, tinggi 35 cm
Bahan
Batu Bata / Merah 50.00000 bh 700.00 35,000.00
PC / Portland cement 44.00000 Kg 1,450.00 63,800.00
Pasir pasang / beton 0.07000 M3 200,000.00 14,000.00
Batu pecah 2-3 cm 0.07000 M3 260,000.00 18,200.00
Besi Beton / tulangan beton 1.60000 Kg 11,000.00 17,600.00
Pasir pasang / beton 0.06000 M3 200,000.00 12,000.00
Tenaga
Pekerja / Buruh tak terlatih 3.20000 Oh 45,000.00 144,000.00
Tukang batu 1.01500 Oh 57,500.00 58,362.50
Kepala Tukang 0.00150 Oh 62,500.00 93.75
Mandor 0.01600 Oh 68,000.00 1,088.00
203,544.25 160,600.00
19 1 bh Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
Bahan
Batu Bata / Merah 85.00000 bh 700.00 59,500.00
PC / Portland cement 77.00000 Kg 1,450.00 111,650.00
Pasir pasang / beton 0.13000 M3 200,000.00 26,000.00
Batu pecah 2-3 cm 0.02000 M3 260,000.00 5,200.00
Besi Beton / tulangan beton 2.60000 Kg 11,000.00 28,600.00
Pasir pasang / beton 0.09000 M3 200,000.00 18,000.00
Tenaga
Pekerja / Buruh tak terlatih 1.42000 Oh 45,000.00 63,900.00
Tukang batu 0.47300 Oh 57,500.00 27,197.50
Kepala Tukang 0.04700 Oh 62,500.00 2,937.50
Mandor 0.07100 Oh 68,000.00 4,828.00
98,863.00 248,950.00
20 1 bh Memasang bak kontrol pasangan batu bata ukuran (60x60) cm, tinggi 65 cm
Bahan
Batu Bata / Merah 100.00000 bh 700.00 70,000.00
PC / Portland cement 114.00000 Kg 1,450.00 165,300.00
Pasir pasang / beton 0.18400 M3 200,000.00 36,800.00
Batu pecah 2-3 cm 0.03300 M3 260,000.00 8,580.00
Besi Beton / tulangan beton 4.85000 Kg 11,000.00 53,350.00
Pasir pasang / beton 0.12000 M3 200,000.00 24,000.00
Tenaga
Pekerja / Buruh tak terlatih 2.16000 Oh 45,000.00 97,200.00
Tukang batu 0.72000 Oh 57,500.00 41,400.00
Kepala Tukang 0.07200 Oh 62,500.00 4,500.00

84
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.10800 Oh 68,000.00 7,344.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
156,194.00 358,030.00
21 1 m' Memasang buis beton 1/2 lingkaran dia 20 cm
Tenaga :
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Mandor 0.00700 Oh 68,000.00 476.00
Bahan :
Buis Beton 1/2 ø 20 Cm 1.10000 M! 19,000.00 20,900.00
Batu Bata / Merah 7.00000 Bj 700.00 4,900.00
PC / Portland cement 1.96000 Kg 1,450.00 2,842.00
Pasir pasang / beton 0.02800 M3 200,000.00 5,600.00
Pasir Urug 0.01200 M3 77,300.00 927.60
Upah diambil 50 % 5,619.25 35,169.60
22 1 m' Memasang buis beton 1/2 lingkaran dia 30 cm
Tenaga :
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Mandor 0.00700 Oh 68,000.00 476.00
Bahan :
Buis Beton 1/2 ø 30 Cm 1.10000 M! 35,000.00 38,500.00
Batu Bata / Merah 7.00000 Bj 700.00 4,900.00
PC / Portland cement 1.96000 Kg 1,450.00 2,842.00
Pasir pasang / beton 0.02800 M3 200,000.00 5,600.00
Pasir Urug 0.01200 M3 77,300.00 927.60
Upah diambil 50 % 5,619.25 52,769.60
23 1 m' Memasang buis beton 1/2 lingkaran dia 40 cm
Tenaga :
Tukang batu 0.07000 Oh 57,500.00 4,025.00
Kepala Tukang 0.00700 Oh 62,500.00 437.50
Pekerja / Buruh tak terlatih 0.14000 Oh 45,000.00 6,300.00
Mandor 0.00700 Oh 68,000.00 476.00
Bahan :
Buis Beton 1/2 ø 40 Cm 1.10000 M! 35,000.00 38,500.00
Batu Bata / Merah 7.00000 Bj 700.00 4,900.00
PC / Portland cement 1.96000 Kg 1,450.00 2,842.00
Pasir pasang / beton 0.02800 M3 200,000.00 5,600.00
Pasir Urug 0.01200 M3 77,300.00 927.60
Upah diambil 50 % 5,619.25 52,769.60
24 1 m' Memasang pipa galvanis diameter 1” tebal 0,8 mm
Bahan
Pipa Galvanis Ø 1" Tebal 0.8 mm 1.20000 M` 13,500.00 16,200.00
harga
Perlengkapan 0.35000 13,500.00 4,725.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00

85
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 20,925.00
25 1 m' Memasang pipa galvanis diameter 1,5” tebal 0,8 mm
Bahan
Pipa Galvanis Ø1.5" Tebal 0.8 mm 1.20000 M` 15,000.00 18,000.00
harga
Perlengkapan 0.35000 15,000.00 5,250.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 23,250.00
26 1 m' Memasang pipa galvanis diameter 2” tebal 0,8 mm
Bahan
Pipa Galvanis Ø2" Tebal 0.8 mm 1.20000 1,2 M` 22,000.00 26,400.00
harga
Perlengkapan 0.35000 22,000.00 7,700.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 34,100.00
27 1 m' Memasang pipa galvanis diameter 2,5” tebal 0,8 mm
Bahan
Pipa Galvanis Ø2.5" Tebal 0.8 mm 1.20000 1,2 M` 31,500.00 37,800.00
harga
Perlengkapan 0.35000 31,500.00 11,025.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00
Mandor 0.00540 Oh 68,000.00 367.20
16,702.20 48,825.00
28 1 m' Memasang pipa galvanis diameter 3” tebal 0,8 mm
Bahan
Pipa Galvanis Ø3" Tebal 0.8 mm 1.20000 1,2 M` 50,000.00 60,000.00
harga
Perlengkapan 0.35000 50,000.00 17,500.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00
Mandor 0.00540 Oh 68,000.00 367.20
16,702.20 77,500.00
29 1 m' Memasang pipa galvanis diameter 4” tebal 0,8 mm
Bahan
Pipa Galvanis Ø4" Tebal 0.8 mm 1.20000 1,2 M` 66,000.00 79,200.00
harga
Perlengkapan 0.35000 66,000.00 23,100.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00

86
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00
Mandor 0.00540 Oh 68,000.00 367.20
16,702.20 102,300.00
31 1 m' Memasang pipa GIP BSA diameter ½”
Bahan
GIP BSA diameter 1/2" 1.20000 M` 6,000.00 7,200.00
harga
Perlengkapan 0.35000 6,000.00 2,100.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 9,300.00
32 1 m' Memasang pipa GIP BSA diameter ¾”
Bahan
GIP BSA diameter 3/4" 1.20000 M` 9,000.00 10,800.00
harga
Perlengkapan 0.35000 9,000.00 3,150.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 13,950.00
33 1 m' Memasang pipa GIP BSA diameter 1”
Bahan
GIP BSA diameter 1" 1.20000 1,2 M` 12,000.00 14,400.00
harga
Perlengkapan 0.35000 12,000.00 4,200.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.02700 Oh 68,000.00 1,836.00
10,003.50 18,600.00
34 1 m' Memasang pipa GIP BSA diameter 1½”
Bahan
GIP BSA diameter 1,5" 1.20000 1,2 M` 15,750.00 18,900.00
harga
Perlengkapan 0.35000 15,750.00 5,512.50
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00
Mandor 0.00540 Oh 68,000.00 367.20
16,702.20 24,412.50
35 1 m' Memasang pipa GIP BSA diameter 2”
Bahan
GIP BSA diameter 2" 1.20000 1,2 M` 18,750.00 22,500.00
harga
Perlengkapan 0.35000 18,750.00 6,562.50
pipa
Tenaga

87
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00
Mandor 0.00540 Oh 68,000.00 367.20
16,702.20 29,062.50
36 1 m' Memasang pipa GIP BSA diameter 3”
Bahan
GIP BSA diameter 3" 1.20000 1,2 M` 26,250.00 31,500.00
harga
Perlengkapan 0.35000 26,250.00 9,187.50
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.10800 Oh 45,000.00 4,860.00
Tukang batu 0.18000 Oh 57,500.00 10,350.00
Kepala Tukang 0.01800 Oh 62,500.00 1,125.00
Mandor 0.00540 Oh 68,000.00 367.20
16,702.20 40,687.50
37 1 m' Memasang pipa GIP BSA diameter 4”
Bahan
GIP BSA diameter 4" 1.20000 M` 31,500.00 37,800.00
harga
Perlengkapan 0.35000 31,500.00 11,025.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.13500 Oh 45,000.00 6,075.00
Tukang batu 0.22500 Oh 57,500.00 12,937.50
Kepala Tukang 0.02250 Oh 62,500.00 1,406.25
Mandor 0.00680 Oh 68,000.00 462.40
20,881.15 48,825.00
38 1 m' Memasang pipa PVC tipe AW diameter ½”
Bahan
PVC AW Dia 1/2 " 1.20000 M` 5,300.00 6,360.00
harga
Perlengkapan 0.35000 5,300.00 1,855.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.03600 Oh 45,000.00 1,620.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00180 Oh 68,000.00 122.40
5,567.40 8,215.00
39 1 m' Memasang pipa PVC tipe AW diameter ¾”
Bahan
PVC AW Dia 3/4 " 1.20000 M` 6,500.00 7,800.00
harga
Perlengkapan 0.35000 6,500.00 2,275.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.03600 Oh 45,000.00 1,620.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00180 Oh 68,000.00 122.40
5,567.40 10,075.00
40 1 m' Memasang pipa PVC tipe AW diameter 1”
Bahan
PVC AW Dia 1 " 1.20000 M` 7,900.00 9,480.00
harga
Perlengkapan 0.35000 7,900.00 2,765.00
pipa

88
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.03600 Oh 45,000.00 1,620.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00180 Oh 68,000.00 122.40
5,567.40 12,245.00
41 1 m' Memasang pipa PVC tipe AW diameter 5”
Bahan
PVC AW Dia 5 " 1.20000 M` 93,000.00 111,600.00
harga
Perlengkapan 0.35000 93,000.00 32,550.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.03600 Oh 45,000.00 1,620.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00180 Oh 68,000.00 122.40
5,567.40 144,150.00
42 1 m' Memasang pipa PVC tipe AW diameter 2”
Bahan
PVC AW Dia 2 " 1.20000 M` 19,200.00 23,040.00
harga
Perlengkapan 0.35000 19,200.00 6,720.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.05400 Oh 45,000.00 2,430.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.00270 Oh 68,000.00 183.60
8,351.10 29,760.00
43 1 m' Memasang pipa PVC tipe AW diameter 2½ ”
Bahan
PVC. AW Dia 2.5" 1.20000 M` 30,800.00 36,960.00
harga
Perlengkapan 0.35000 30,800.00 10,780.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.03600 Oh 45,000.00 1,620.00
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00180 Oh 68,000.00 122.40
5,567.40 47,740.00
44 1 m' Memasang pipa PVC tipe AW diameter 3 ”
Bahan
PVC AW Dia 3 " 1.20000 M` 36,000.00 43,200.00
harga
Perlengkapan 0.35000 36,000.00 12,600.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.08100 Oh 45,000.00 3,645.00
Tukang batu 0.13500 Oh 57,500.00 7,762.50
Kepala Tukang 0.01350 Oh 62,500.00 843.75
Mandor 0.00410 Oh 68,000.00 278.80
12,530.05 55,800.00
45 1 m' Memasang pipa PVC tipe AW diameter 4 ”
Bahan
PVC AW Dia 4 " 1.20000 M` 52,500.00 63,000.00

89
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
harga
Perlengkapan 0.35000 52,500.00 18,375.00
pipa
Tenaga
Pekerja / Buruh tak terlatih 0.08100 Oh 45,000.00 3,645.00
Tukang batu 0.13500 Oh 57,500.00 7,762.50
Kepala Tukang 0.01350 Oh 62,500.00 843.75
Mandor 0.00410 Oh 68,000.00 278.80
12,530.05 81,375.00
46 1 bh Memasang kran Dupon diameter ½”
Bahan
Kran Dupon 1.00000 Bh 166,000.00 166,000.00
Seal Tape 0.02500 Bh 38,100.00 952.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 166,952.50
47 1 bh Memasang kran Toto diameter ½”
Bahan
Kran Toto 1/2" 1.00000 Bh 250,000.00 250,000.00
Seal Tape 0.02500 Bh 38,100.00 952.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 250,952.50
48 1 bh Memasang kran diameter ½”
Bahan
Kran Dia 1/2 " 1.00000 Bh 23,800.00 23,800.00
Seal Tape 0.02500 Bh 38,100.00 952.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 24,752.50
48 1 bh Memasang kran diameter ¾”
Bahan
Kran Dia 3/4 " 1.00000 Bh 32,700.00 32,700.00
Seal Tape 0.02500 Bh 38,100.00 952.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 33,652.50
49 1 bh Memasang stop kran diameter ½”
Bahan

90
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Stop Kran Dia 1/2 " 1.00000 Bh 31,500.00 31,500.00
Seal Tape 0.02500 Bh 38,100.00 952.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 32,452.50
50 1 bh Memasang stop kran diameter ¾”
Bahan
Stop Kran Dia 3/4 " 1.00000 Bh 36,000.00 36,000.00
Seal Tape 0.02500 Bh 38,100.00 952.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 36,952.50
51 1 bh Memasang stop kran diameter 1”
Bahan
Stop Kran Dia 1 " 1.00000 Bh 42,000.00 42,000.00
Seal Tape 0.02500 Bh 38,100.00 952.50
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 42,952.50
52 1 bh Memasang Floor drain stainless steel
Bahan
Avor staninlees steel 1.00000 Bh 15,800.00 15,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 15,800.00
53 1 bh Memasang Floor drain plastik
Bahan
Avor plastik / floor drain 1.00000 Bh 9,400.00 9,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang batu 0.10000 Oh 57,500.00 5,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
7,165.00 9,400.00
XI. PEKERJAAN BESI DAN ALUMINIUM

1 1 Kg Pabrikasi dan pasang Rangka baja

91
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga :
Tukang besi 0.00600 Oh 57,500.00 345.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Mandor 0.00030 Oh 68,000.00 20.40
Bahan :
Baja Profil 1.10000 Kg 13,000.00 14,300.00
Elektroda dan alat bantu dll 20% x harga bahan 0.20000 % 13,000.00 2,600.00
3,440.40 16,900.00
2 1 Kg Pasang rangka atap baja
Bahan
Baja Profil 1.10000 Kg 13,000.00 14,300.00
Cat Meny besi 0.08000 kg 15,000.00 1,200.00
Tenaga
Tukang besi 0.00600 Oh 57,500.00 345.00
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00030 Oh 68,000.00 20.40
3,440.40 15,500.00
3 1 m2 Pasang pintu besi baja
Bahan
Pintu besi baja 1.00000 M2 1,000,000.00 1,000,000.00
Tenaga
Tukang besi 0.65000 Oh 57,500.00 37,375.00
Pekerja / Buruh tak terlatih 0.65000 Oh 45,000.00 29,250.00
Kepala Tukang 0.06500 Oh 62,500.00 4,062.50
Mandor 0.32000 Oh 68,000.00 21,760.00
92,447.50 1,000,000.00
4 1 m2 Pasang pintu lipat
Bahan
Pintu besi baja 1.00000 M2 1,000,000.00 1,000,000.00
Tenaga
Tukang besi 1.05000 Oh 57,500.00 60,375.00
Pekerja / Buruh tak terlatih 1.05000 Oh 45,000.00 47,250.00
Kepala Tukang 0.10500 Oh 62,500.00 6,562.50
Mandor 0.00520 Oh 68,000.00 353.60
114,541.10 1,000,000.00
5 1 m2 Pasang Rolling door
Bahan
Roling Door aluminium 1.00000 M2 425,000.00 425,000.00
Tenaga
Tukang besi 1.50000 Oh 57,500.00 86,250.00
Pekerja / Buruh tak terlatih 1.05000 Oh 45,000.00 47,250.00
Kepala Tukang 0.10500 Oh 62,500.00 6,562.50
Mandor 0.00520 Oh 68,000.00 353.60
140,416.10 425,000.00
6 1 m2 Pasang pintu alluminium
Bahan
Pintu aluminium coklat / hitam 4" 1.00000 M2 670,000.00 670,000.00

92
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Tukang besi 1.05000 Oh 57,500.00 60,375.00
Pekerja / Buruh tak terlatih 1.05000 Oh 45,000.00 47,250.00
Kepala Tukang 0.10500 Oh 62,500.00 6,562.50
Mandor 0.00520 Oh 68,000.00 353.60
114,541.10 670,000.00
7 1 m2 Pasang kawat harmonika
Bahan
Kawat Harmonika 1.10000 M2 31,000.00 34,100.00
Paku biasa 0.02000 Kg 16,000.00 320.00
Kayu Kamper papan 0.00180 M3 10,900,000.00 19,620.00
Tenaga
Tukang besi 0.10000 Oh 57,500.00 5,750.00
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00050 Oh 68,000.00 34.00
10,909.00 54,040.00
8 1 m2 Pasang kawat nyamuk
Bahan
Kawat Nyamuk aluminium 1.10000 M2 7,300.00 8,030.00
Paku biasa 0.02000 Kg 16,000.00 320.00
Kayu Kamper papan 0.00180 M3 10,900,000.00 19,620.00
Tenaga
Tukang besi 0.10000 Oh 57,500.00 5,750.00
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00050 Oh 68,000.00 34.00
10,909.00 27,970.00
9 1 m2 Pasang jendela nako & tralis
Bahan
Naco (Kerangka dan Daun ) 1.10000 M2 250,000.00 275,000.00
Paku Sekrup 0.02000 Kg 700.00 14.00
Teralis Besi 0.02500 M2 325,000.00 8,125.00
Tenaga
Tukang besi 0.20000 Oh 57,500.00 11,500.00
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00
Mandor 0.00100 Oh 68,000.00 68.00
21,818.00 283,139.00
10 1 m` Pasang talang datar, seng bjls 30
Bahan
Seng Plat BJLS 30 lebar 0,90 m 0.50000 M' 42,000.00 21,000.00
Paku biasa 0.01500 Kg 16,000.00 240.00
Kayu Meranti Papan 0.00960 M3 6,100,000.00 58,560.00
Cat Meny besi 0.25000 Kg 15,000.00 3,750.00
Tenaga
Tukang besi 0.40000 Oh 57,500.00 23,000.00
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50

93
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00125 Oh 68,000.00 85.00
31,397.50 83,550.00
11 1 m` Pasang talang miring, seng bjls 30
Bahan
Seng Plat BJLS 30 lebar 0,90 m 0.50000 M' 42,000.00 21,000.00
Paku biasa 0.01500 Kg 16,000.00 240.00
Kayu Meranti Papan 0.01900 M3 6,100,000.00 115,900.00
Cat Meny besi 0.30000 Kg 15,000.00 4,500.00
Tenaga
Tukang besi 0.40000 Oh 57,500.00 23,000.00
Pekerja / Buruh tak terlatih 0.04000 Oh 45,000.00 1,800.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00125 Oh 68,000.00 85.00
26,447.50 141,640.00
12 1 m’ Pasang talang ½ lingkaran D-10 cm, seng bjls 30
Bahan
Seng Plat BJLS 30 lebar 0,90 m 0.30000 M' 42,000.00 12,600.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Kayu Meranti Papan 0.01900 M3 6,100,000.00 115,900.00
Besi plat 0.50000 Kg 12,000.00 6,000.00
Tenaga
Tukang besi 0.15000 Oh 57,500.00 8,625.00
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00125 Oh 68,000.00 85.00
21,522.50 136,100.00
13 1 m’ Pasang talang ½ lingkaran D-10 cm, seng bjls 20
Bahan
Seng Plat BJLS 20 lebar 0,90 m 0.30000 M' 11,000.00 3,300.00
Paku biasa 0.10000 Kg 16,000.00 1,600.00
Kayu Meranti Papan 0.01900 M3 6,100,000.00 115,900.00
Besi plat 0.50000 Kg 12,000.00 6,000.00
Tenaga
Tukang besi 0.15000 Oh 57,500.00 8,625.00
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Kepala Tukang 0.02500 Oh 62,500.00 1,562.50
Mandor 0.00125 Oh 68,000.00 85.00
21,522.50 126,800.00
XII. PEKERJAAN KUNCI DAN KACA

1 1 bh Pasang kunci tanam biasa


Bahan
Slot ( Kunci-kunci pintu ) lokal 1.00000 Bh 65,000.00 65,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.01000 Oh 45,000.00 450.00
Tukang kayu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Mandor 0.00500 Oh 68,000.00 340.00
30,165.00 65,000.00

94
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
2 1 bh Pasang kunci tanam SES ( pelor )
Bahan
Kunci tanam merk SES ( pelor ) 1.00000 Bh 152,500.00 152,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.00300 Oh 68,000.00 204.00
41,154.00 152,500.00
3 1 bh Pasang kunci tanam SES
Bahan
Selot ( kunci pintu ) merk SES 1.00000 Bh 220,500.00 220,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.00300 Oh 68,000.00 204.00
41,154.00 220,500.00
4 1 bh Pasang selot rossete dekson
Bahan
Selot Rossete Dekson 1.00000 Bh 345,400.00 345,400.00
Tenaga
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.00300 Oh 68,000.00 204.00
41,154.00 345,400.00
5 1 bh Pasang engsel jendela biasa
Bahan
Engsel Jendela ( H ) 1.00000 Bh 6,700.00 6,700.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 6,700.00
6 1 bh Pasang engsel pintu biasa
Bahan
Engsel Pintu ( H ) 1.00000 Bh 7,800.00 7,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 7,800.00
7 1 bh Pasang engsel stainllesstel dekson 3"
Bahan
Engsel Stainlesstel Dekson 3" 1.00000 Bh 50,400.00 50,400.00
Tenaga

95
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 50,400.00
8 1 bh Pasang engsel stainllesstel dekson 4"
Bahan
Engsel Stainlesstel Dekson 4" 1.00000 Bh 100,800.00 100,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 100,800.00
9 1 bh Pasang engsel stainllesstel dekson 5"
Bahan
Engsel Stainlesstel Dekson 5" 1.00000 Bh 112,300.00 112,300.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 112,300.00
10 1 bh Pasang grendel pintu panjang
Bahan :
Grendel Pintu Panjang ( sespen ) 1.00000 Bh 12,200.00 12,200.00
Tenaga :
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 12,200.00
11 1 bh Pasang grendel jendela SES
Bahan :
Grendel jendela merk SES 1.00000 Bh 22,000.00 22,000.00
Tenaga :
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 22,000.00
12 1 bh Pasang grendel tanam SES
Bahan :
Grendel tanam merk SES 1.00000 Bh 55,400.00 55,400.00
Tenaga :
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00

96
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
10,288.50 55,400.00
13 1 bh Pasang grendel pintu ganda dekson 40 cm
Bahan :
Grendel pintu ganda Dekson 40 cm komplit 1.00000 Bh 123,900.00 123,900.00
Tenaga :
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 123,900.00
14 1 bh Pasang hak angin
Bahan
Hak Angin 1.00000 Bh 10,000.00 10,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 10,000.00
15 1 bh Pasang hak angin SES
Bahan
Hak angin Merk SES 1.00000 Bh 31,500.00 31,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 31,500.00
16 1 bh Pasang handel pintu stainlesstel kecil
Bahan
Handle pintu stanless steel kecil 1.00000 Bh 15,800.00 15,800.00
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Tukang kayu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.05000 Oh 62,500.00 3,125.00
Mandor 0.00250 Oh 68,000.00 170.00
34,295.00 15,800.00
17 1 bh Pasang handel pintu stainlesstel besar
Bahan
Handle pintu stanless steel besar 1.00000 Bh 94,500.00 94,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Tukang kayu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.05000 Oh 62,500.00 3,125.00
Mandor 0.00250 Oh 68,000.00 170.00
34,295.00 94,500.00
18 1 bh Pasang handel pintu ganda dekson 30 cm
Bahan
Handle pintu ganda Dekson 30 cm komplit 1.00000 Bh 580,700.00 580,700.00

97
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Tukang kayu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.05000 Oh 62,500.00 3,125.00
Mandor 0.00250 Oh 68,000.00 170.00
34,295.00 580,700.00
19 1 bh Pasang handel pintu ganda dekson 40 cm
Bahan
Handle pintu ganda Dekson 40 cm komplit 1.00000 Bh 619,500.00 619,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Tukang kayu 0.50000 Oh 57,500.00 28,750.00
Kepala Tukang 0.05000 Oh 62,500.00 3,125.00
Mandor 0.00250 Oh 68,000.00 170.00
34,295.00 619,500.00
20 1 bh Pasang rel pintu dorong
Bahan
Rel pintu dorong 1.00000 Bh 269,500.00 269,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.06000 Oh 45,000.00 2,700.00
Tukang kayu 0.60000 Oh 57,500.00 34,500.00
Kepala Tukang 0.06000 Oh 62,500.00 3,750.00
Mandor 0.00300 Oh 68,000.00 204.00
41,154.00 269,500.00
21 1 m2 Pasang kaca , tebal 3 mm
Bahan
Kaca Bening Uk. 3 mm 1.10000 M2 53,000.00 58,300.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 58,300.00
22 1 m2 Pasang kaca , tebal 5 mm
Bahan
Kaca Bening Uk. 5 mm 1.10000 M2 55,000.00 60,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 60,500.00
23 1 m2 Pasang kaca Ry band , tebal 5 mm
Bahan
Kaca Ray-band Uk. 5 mm 1.10000 M2 80,000.00 88,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50

98
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 88,000.00
24 1 m2 Pasang kaca patri , tebal 5 mm
Bahan
Kaca patry 1.10000 M2 2,727,300.00 3,000,030.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 3,000,030.00
25 1 m2 Pasang kaca air tbl. 5 mm
Bahan :
Kaca air 5 Cm 1.10000 M2 86,000.00 94,600.00
Tenaga
Pekerja / Buruh tak terlatih 0.01500 Oh 45,000.00 675.00
Tukang kayu 0.15000 Oh 57,500.00 8,625.00
Kepala Tukang 0.01500 Oh 62,500.00 937.50
Mandor 0.00075 Oh 68,000.00 51.00
10,288.50 94,600.00

XIII. PEKRJAAN PENUTUP LANTAI

1 1 m2 Pasang lantai ubin pc abu-abu ukuran 20x20 cm


Bahan
Ubin Abu-abu Uk. 20Cm x 20Cm 1.06000 Bh 30,000.00 31,800.00
PC / Portland cement 10.40000 Kg 1,450.00 15,080.00
Pasir pasang / beton 0.01350 M3 200,000.00 2,700.00
Tenaga
Pekerja / Buruh tak terlatih 0.27000 Oh 45,000.00 12,150.00
Tukang batu 0.13000 Oh 57,500.00 7,475.00
Kepala Tukang 0.01300 Oh 62,500.00 812.50
Mandor 0.01350 Oh 68,000.00 918.00
21,355.50 49,580.00
2 1 m2 Pasang lantai keramik ukuran 20x20 cm
Bahan
Keramik Uk. 20Cm x 20Cm 1.05200 M2 41,000.00 43,132.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 75,449.50
3 1 m2 Pasang lantai keramik tekstur ukuran 20x20 cm
Bahan #N/A
Keramik tekstur Uk. 20cm x 20 cm 1.05200 M2 46,000.00 48,392.00

99
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 80,709.50
4 1 m2 Pasang lantai keramik tekstur ukuran 30x30 cm
Bahan
Keramik tekstur Uk. 30cm x 30 cm 1.05200 M2 52,000.00 54,704.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 87,021.50
5 1 m2 Pasang lantai Granit ( ex Granito ) warna terang ukuran 40x40 cm
Bahan
Granit (ex Granito) warna terang Uk. 40x40 cm 1.05200 M2 129,000.00 135,708.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 168,025.50
6 1 m2 Pasang lantai Granit ( ex Granito ) warna gelap ukuran 40x40 cm
Bahan
Granit (ex Granito) warna gelap Uk. 40x40 cm 1.05200 M2 141,000.00 148,332.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 180,649.50
7 1 m2 Pasang lantai Granit ( ex Granito ) tektur ukuran 40x40 cm
Bahan
Granit (ex Granito) tekstur Uk. 40x40 cm 1.05200 M2 212,000.00 223,024.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50

100
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 255,341.50
8 1 m2 Pasang lantai Granit ( ex Granito ) tektur ukuran 60x60 cm
Bahan
Granit (ex Granito) tekstur Uk. 60x60 cm 1.05200 M2 301,000.00 316,652.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 348,969.50
9 1 m2 Pasang lantai Granit ( ex Granito ) warna terang ukuran 60x60 cm
Bahan
Granit (ex Granito) warna terang Uk. 60x60 cm 1.05200 M2 218,000.00 229,336.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 261,653.50
10 1 m2 Pasang lantai Granit ( ex Granito ) warna gelap ukuran 60x60 cm
Bahan
Granit (ex Granito) warna gelap Uk. 60x60 cm 1.05200 M2 243,000.00 255,636.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 287,953.50
11 1 m2 Pasang lantai batu lempeng
Bahan
Batu lempeng 1.05200 M2 88,000.00 92,576.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00

101
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 124,893.50
12 1 m2 Pasang lantai marmer bakar
Bahan
Marmer bakar 1.05200 M2 100,000.00 105,200.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 137,517.50
13 1 m2 Pasang lantai Keramik putih ukuran 40x40 cm
Bahan
Keramik putih Uk. 40cm x 40 cm 1.05200 M2 38,000.00 39,976.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 72,293.50
14 1 m2 Pasang lantai Keramik warna ukuran 40x40 cm
Bahan
Keramik motif Uk. 40 cm x 40 cm 1.05200 M2 47,000.00 49,444.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 81,761.50
15 1 m2 Pasang lantai Keramik putih ukuran 30x30 cm
Bahan
Keramik putih Uk. 30 cm x 30 cm 1.05200 M2 32,000.00 33,664.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00

102
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 65,981.50
16 1 m2 Pasang lantai Keramik warna ukuran 30x30 cm
Bahan
Keramik motif Uk. 30 cm x 30 cm 1.05200 M2 40,000.00 42,080.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 74,397.50
17 1 m2 Pasang lantai marmer
Bahan
Marmer Putih 1.05200 Bh 175,000.00 184,100.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 216,417.50
18 1 m2 Pasang lantai granit motif
Bahan
Batu granit motif 1.05200 Bh 170,000.00 178,840.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 211,157.50
19 1 m2 Pasang lantai batu candi hitam
Bahan
Batu candi hitam 1.05200 Bh 110,000.00 115,720.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga

103
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 148,037.50
20 1 m2 Pasang lantai andesit 30 x 30 cm
Bahan
Batu Andesit 30 x 30 cm 1.05200 Bh 155,000.00 163,060.00
PC / Portland cement 14.15000 Kg 1,450.00 20,517.50
Pasir pasang / beton 0.03900 M3 200,000.00 7,800.00
Semen Putih / warna 2.00000 Kg 2,000.00 4,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 195,377.50

21 1 m2 Pasang Paving Stone / conblok Warna Tebal 6 Cm K225


Tenaga :
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Bahan :
Paving Stone / Conblok warna tebal 6 cm, K225 1.10000 M2 57,000.00 62,700.00
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
69,700.00 12,450.00
22 1 m2 Pasang Paving Stone / conblok Abu-abu Tebal 6 Cm K225
Tenaga :
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Bahan :
Paving Stone / Conblok abu - abu tebal 6 cm, K2 1.10000 M2 51,700.00 56,870.00
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
63,870.00 12,450.00
23 1 m2 Pasang Paving Stone / conblok Warna Tebal 8 Cm K225
Tenaga :
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Bahan : #N/A
Paving Stone / Conblok warna tebal 8 cm, K225 1.10000 M2 62,000.00 68,200.00
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
75,200.00 12,450.00
24 1 m2 Pasang Paving Stone / conblok Abu-abu Tebal 8 Cm K225
Tenaga :
Tukang batu 0.06000 Oh 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 Oh 45,000.00 9,000.00
Bahan :
Paving Stone / Conblok abu - abu tebal 8 cm, K2 1.10000 M2 55,800.00 61,380.00
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00

104
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
68,380.00 12,450.00
25 1 m2 Pasang Paving Stone / Conblok 5 Warna Uk 10 x 10 cm
Bahan :
Paving Stone / conblok (10x10) 5 warna 1.10000 m2 70,000.00 77,000.00
Pasir pasang / beton 0.03500 m3 200,000.00 7,000.00
Tenaga :
Tukang batu 0.06000 m2 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 m2 45,000.00 9,000.00
12,450.00 84,000.00
26 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm K 300
Bahan :
Paving Stone / Conblok abu - abu tebal 6 cm, K3 1.10000 m2 55,000.00 60,500.00
Pasir pasang / beton 0.03500 m3 200,000.00 7,000.00
Tenaga :
Tukang batu 0.06000 m2 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 m2 45,000.00 9,000.00
12,450.00 67,500.00
27 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm K 400
Bahan :
Paving Stone / Conblok abu - abu tebal 6 cm, K4 1.10000 m2 58,300.00 64,130.00
Pasir pasang / beton 0.03500 m3 200,000.00 7,000.00
Tenaga :
Tukang batu 0.06000 m2 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 m2 45,000.00 9,000.00
12,450.00 71,130.00
28 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm
Bahan :
Paving Stone / Conblok abu - abu tebal 6 cm 1.10000 m2 37,000.00 40,700.00
Pasir pasang / beton 0.03500 m3 200,000.00 7,000.00
Tenaga :
Tukang batu 0.06000 m2 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 m2 45,000.00 9,000.00
12,450.00 47,700.00
29 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 8 cm
Bahan :
Paving StonE / Conblok abu - abu tebal 8 cm 1.10000 m2 39,000.00 42,900.00
Pasir pasang / beton 0.03500 m3 200,000.00 7,000.00
Tenaga :
Tukang batu 0.06000 m2 57,500.00 3,450.00
Pekerja / Buruh tak terlatih 0.20000 m2 45,000.00 9,000.00
12,450.00 49,900.00
30 1 m2 Pasang dinding keramik putih Uk. 20x25 cm
Bahan
Keramik dinding putih ukuran 20/25 Cm 1.06000 Bh 46,000.00 48,760.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 200,000.00 3,600.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00

105
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tukang batu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 69,725.00
31 1 m2 Pasang dinding keramik motif Uk. 20x25 cm
Bahan
Keramik dinding motif Uk. 20cm x 25 cm 1.06000 Bh 47,000.00 49,820.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 200,000.00 3,600.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang batu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 70,785.00
32 1 m2 Pasang dinding keramik Uk. 20x33 cm
Bahan
Keramik dinding Uk. 20cm x 33 cm 1.06000 Bh 62,000.00 65,720.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 200,000.00 3,600.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang batu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 86,685.00
33 1 m2 Pasang dinding keramik cutting Uk. 30x50 cm
Bahan
Keramik cutting Uk. 30cm x 50 cm 1.06000 Bh 103,000.00 109,180.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 200,000.00 3,600.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang batu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 130,145.00
34 1 m2 Pasang dinding keramik Cutting Uk. 31x63 cm
Bahan
Keramik cutting Uk. 31cm x 63 cm 1.06000 Bh 174,000.00 184,440.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 200,000.00 3,600.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang batu 0.45000 Oh 57,500.00 25,875.00

106
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 205,405.00
35 1 m2 Pasang dinding keramik tekstur Cutting Uk. 31x63 cm
Bahan
Keramik tekstur cutting Uk. 31cm x 63 cm 1.06000 Bh 193,000.00 204,580.00
PC / Portland cement 9.30000 Kg 1,450.00 13,485.00
Pasir pasang / beton 0.01800 M3 200,000.00 3,600.00
Semen Putih / warna 1.94000 Kg 2,000.00 3,880.00
Tenaga
Pekerja / Buruh tak terlatih 0.60000 Oh 45,000.00 27,000.00
Tukang batu 0.45000 Oh 57,500.00 25,875.00
Kepala Tukang 0.04500 Oh 62,500.00 2,812.50
Mandor 0.03000 Oh 68,000.00 2,040.00
57,727.50 225,545.00
36 1 m2 Pasang dinding batu lempeng
Bahan
Batu Lempeng 1.05000 M2 88,000.00 92,400.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 116,437.50
37 1 m2 Pasang dinding batu andesit alur
Bahan
Batu Andesit alur 1.05000 M2 195,000.00 204,750.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 228,787.50
38 1 m2 Pasang dinding batu andesit 30 x 30 cm
Bahan
Batu Andesit 30 x 30 cm 1.05000 M2 155,000.00 162,750.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 186,787.50
39 1 m2 Pasang dinding batu candi hitam

107
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Bahan
Batu candi hitam 1.05000 M2 110,000.00 115,500.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 139,537.50
40 1 m2 Pasang dinding batu susun sirih
Bahan
Batu susun sirih 1.05000 M2 240,000.00 252,000.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 276,037.50
41 1 m2 Pasang dinding batu salagedang
Bahan
Batu Salagedang 1.05000 M2 95,000.00 99,750.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 123,787.50
42 1 m2 Pasang dinding batu paras grobongan
Bahan
Batu paras Grobongan 1.05000 M2 85,000.00 89,250.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 113,287.50
43 1 m2 Pasang dinding batu granit motif
Bahan
Batu granit motif 1.05000 M2 170,000.00 178,500.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga

108
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 202,537.50
44 1 m2 Pasang dinding batu marmo biasa
Bahan
Batu marmo biasa 1.05000 M2 81,900.00 85,995.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 110,032.50
45 1 m2 Pasang dinding batu marmo warna
Bahan
Batu marmo warna 1.05000 M2 125,000.00 131,250.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 155,287.50
46 1 m2 Pasang dinding batu bobos
Bahan
Batu Bobos 1.05000 M2 100,000.00 105,000.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 129,037.50
47 1 m2 Pasang dinding batu warna ( hias )
Bahan
Batu warna ( hias ) 1.05000 M2 82,500.00 86,625.00
PC / Portland cement 11.75000 Kg 1,450.00 17,037.50
Pasir pasang / beton 0.03500 M3 200,000.00 7,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.62000 Oh 45,000.00 27,900.00
Tukang batu 0.35000 Oh 57,500.00 20,125.00
Kepala Tukang 0.03500 Oh 62,500.00 2,187.50
Mandor 0.03000 Oh 68,000.00 2,040.00
52,252.50 110,662.50

109
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
48 1 m' Plint kayu 2 x 10 cm
Bahan
Kayu jati papan lokal 0.00240 M3 20,454,600.00 49,091.04
Paku Sekrup 0.05000 Kg 700.00 35.00
Tenaga
Pekerja / Buruh tak terlatih 0.12000 Oh 45,000.00 5,400.00
Tukang kayu 0.12000 Oh 57,500.00 6,900.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
13,458.00 49,126.04
49 1 m2 Lantai Patlag 1 Lapis Bata merah camp. 1 Sm : 1 Kpr : 3 Psr
Tenaga :
Tukang batu 0.16000 Oh 57,500.00 9,200.00
Kepala Tukang 0.01000 Oh 62,500.00 625.00
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Mandor 0.02500 Oh 68,000.00 1,700.00
Bahan :
Batu Bata / Merah 30.00000 Bj 700.00 21,000.00
Kapur Batu 0.01200 M3 545,500.00 6,546.00
Semen Merah 0.01200 M3 135,000.00 1,620.00
Pasir pasang / beton 0.03600 M3 200,000.00 7,200.00
13,775.00 36,366.00
50 1 m' Plint keramik uk 10 x 20 cm
Bahan
Keramik Arstistik Uk. 10 x 20 cm 5.00000 bh 16,800.00 84,000.00
PC / Portland cement 1.65000 Kg 1,450.00 2,392.50
Pasir pasang / beton 0.00320 m3 200,000.00 640.00
Semen Putih / warna 0.10000 kg 2,000.00 200.00
Tenaga
Pekerja / Buruh tak terlatih 0.09000 Oh 45,000.00 4,050.00
Tukang batu 0.09000 Oh 57,500.00 5,175.00
Kepala Tukang 0.00900 Oh 62,500.00 562.50
Mandor 0.00450 Oh 68,000.00 306.00
10,093.50 87,232.50

XIV. PEKERJAAN PENGECATAN

1 1 m2 Mengikis/mengerok permukaan cat tembok lama


Bahan
Soda api 0.05000 Kg 34,000.00 1,700.00
Tenaga
Pekerja / Buruh tak terlatih 0.15000 Oh 45,000.00 6,750.00
Mandor 0.00250 Oh 68,000.00 170.00
6,920.00 1,700.00
2 1 m2 Pengecatan bidang kayu lama
Bahan
Plamur kayu 0.15000 Kg 16,000.00 2,400.00
Cat Kayu Emco 0.17000 Kg 50,000.00 8,500.00
Cat Kayu Emco 0.17000 Kg 50,000.00 8,500.00

110
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Tenaga
Pekerja / Buruh tak terlatih 0.07000 Oh 45,000.00 3,150.00
Tukang cat 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00750 Oh 62,500.00 468.75
Mandor 0.00250 Oh 68,000.00 170.00
8,101.25 19,400.00
3 1 m2 Pengecatan bidang kayu baru (1 lps plamir),1 lps cat dasar, 2 lps cat penutup.
Bahan
Cat Meny kayu 0.20000 Kg 15,800.00 3,160.00
Plamur kayu 0.15000 Kg 16,000.00 2,400.00
Cat Kayu Emco 0.17000 kg 50,000.00 8,500.00
Cat Kayu Emco 0.26000 Kg 50,000.00 13,000.00
Tenaga
Pekerja / Buruh tak terlatih 0.07000 Oh 45,000.00 3,150.00
Tukang cat 0.00900 Oh 57,500.00 517.50
Kepala Tukang 0.00600 Oh 62,500.00 375.00
Mandor 0.00250 Oh 68,000.00 170.00
4,212.50 27,060.00
4 1 m2 Pengecatan bidang kayu baru (1 lps plamir), 1 lps cat dasar, 3 lpis cat penutup.
Bahan
Cat Meny kayu 0.20000 Kg 15,800.00 3,160.00
Plamur kayu 0.15000 Kg 16,000.00 2,400.00
Cat Kayu Emco 0.17000 kg 50,000.00 8,500.00
Cat Kayu Emco 0.35000 Kg 50,000.00 17,500.00
Tenaga
Pekerja / Buruh tak terlatih 0.07000 Oh 45,000.00 3,150.00
Tukang cat 0.10500 Oh 57,500.00 6,037.50
Kepala Tukang 0.00400 Oh 62,500.00 250.00
Mandor 0.00250 Oh 68,000.00 170.00
9,607.50 31,560.00
5 1 m2 Pelaburan bidang kayu dengan teak oil
Bahan
Teak oil 0.36000 Ltr 7,700.00 2,772.00
Tenaga
Pekerja / Buruh tak terlatih 0.04000 Oh 45,000.00 1,800.00
Tukang cat 0.06300 Oh 57,500.00 3,622.50
Kepala Tukang 0.06300 Oh 62,500.00 3,937.50
Mandor 0.00250 Oh 68,000.00 170.00
9,530.00 2,772.00
6 1 m2 Pelaburan bidang kayu dengan politur
Bahan
Politur jadi 0.15000 Ltr 43,000.00 6,450.00
Politur jadi 0.37200 Ltr 43,000.00 15,996.00
Kertas gosok ( rempelas ) 2.00000 Lbr 3,000.00 6,000.00
Tenaga
Pekerja / Buruh tak terlatih - Oh 45,000.00
Tukang cat 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.01600 Oh 62,500.00 1,000.00
Mandor 0.00250 Oh 68,000.00 170.00

111
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
4,620.00 28,446.00
7 1 m2 Pelaburan bidang kayu dengan cat residu dan ter
Bahan
Residu ( Ter ) 0.35000 Ltr 5,500.00 1,925.00
Tenaga
Pekerja / Buruh tak terlatih 0.10000 Oh 45,000.00 4,500.00
Mandor 0.00600 Oh 68,000.00 408.00
4,908.00 1,925.00
8 1 m2 Pelaburan bidang kayu dengan vernis
Bahan
Vernis 0.15000 Ltr 36,000.00 5,400.00
Dempul Kayu 0.05000 Kg 16,000.00 800.00
Kertas gosok ( rempelas ) 0.10000 Lbr 3,000.00 300.00
Kuas Eterna 4 " 0.01000 bh 11,900.00 119.00
Tenaga
Pekerja / Buruh tak terlatih 0.16000 Oh 45,000.00 7,200.00
Tukang cat 0.16000 Oh 57,500.00 9,200.00
Kepala Tukang 0.01600 Oh 62,500.00 1,000.00
Mandor 0.00250 Oh 68,000.00 170.00
17,570.00 6,619.00
9 1 m2 Pengecatan tembok baru (1 lapis plamir,1 lapis cat dasar, 2 lapis cat penutup)
Bahan
Plamur Tembok 0.10000 Kg 9,800.00 980.00
Cat Tembok 0.10000 Kg 22,000.00 2,200.00
Cat Tembok 0.26000 Kg 22,000.00 5,720.00
Tenaga
Pekerja / Buruh tak terlatih 0.02000 Oh 45,000.00 900.00
Tukang cat 0.06300 Oh 57,500.00 3,622.50
Kepala Tukang 0.00630 Oh 62,500.00 393.75
Mandor 0.00250 Oh 68,000.00 170.00
5,086.25 8,900.00
10 1 m2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
Bahan
Cat Tembok 0.12000 Kg 22,000.00 2,640.00
Cat Tembok 0.18000 Kg 22,000.00 3,960.00
Tenaga
Pekerja / Buruh tak terlatih 0.02800 Oh 45,000.00 1,260.00
Tukang cat 0.04200 Oh 57,500.00 2,415.00
Kepala Tukang 0.00420 Oh 62,500.00 262.50
Mandor 0.00250 Oh 68,000.00 170.00
4,107.50 6,600.00
11 1 m2 Pegecatan permukaan baja dengan meni besi
Bahan
Cat Meny besi 0.10000 Kg 15,000.00 1,500.00
Kuas Eterna 4 " 0.01000 Bh 11,900.00 119.00
Tenaga
Pekerja / Buruh tak terlatih 0.02000 Oh 45,000.00 900.00
Tukang cat 0.20000 Oh 57,500.00 11,500.00
Kepala Tukang 0.02000 Oh 62,500.00 1,250.00

112
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Mandor 0.01000 Oh 68,000.00 680.00
14,330.00 1,619.00
12 1 m2 Pegecatan permukaan baja dengan meni besi dan perancah
Bahan
Cat Meny besi 0.10000 Kg 15,000.00 1,500.00
Kuas Eterna 4 " 0.01000 Bh 11,900.00 119.00
Kayu bekisting 0.00200 M3 2,600,000.00 5,200.00
Tenaga
Pekerja / Buruh tak terlatih 0.25000 Oh 45,000.00 11,250.00
Tukang cat 0.22500 Oh 57,500.00 12,937.50
Kepala Tukang 0.02250 Oh 62,500.00 1,406.25
Mandor 0.00750 Oh 68,000.00 510.00
26,103.75 6,819.00
13 1 m2 Pengecatan Plafond lama (1 lapis cat dasar, 2 lapis cat penutup)
Bahan :
Cat Tembok 0.30000 Kg 22,000.00 6,600.00
Tenaga :
Pekerja / Buruh tak terlatih 0.02800 Oh 45,000.00 1,260.00
Tukang cat 0.04200 Oh 57,500.00 2,415.00
Kepala Tukang 0.00420 Oh 62,500.00 262.50
Mandor 0.00250 Oh 68,000.00 170.00
4,107.50 6,600.00
Pengecatan plafond lama 1,25 x 5,134.38 8,250.00

14 1 m2 Pengecatan Plafond baru (1 lapis plamir,1 lapis cat dasar, 2 lapis cat penutup)
Bahan :
Plamur Tembok 0.10000 Kg 9,800.00 980.00
Cat Tembok 0.36000 Kg 22,000.00 7,920.00
Tenaga :
Pekerja / Buruh tak terlatih 0.02000 Oh 45,000.00 900.00
Tukang cat 0.06300 Oh 57,500.00 3,622.50
Kepala Tukang 0.00630 Oh 62,500.00 393.75
Mandor 0.00250 Oh 68,000.00 170.00
5,086.25 8,900.00
Pengecatan plafond baru 1,25 x 6,357.81 11,125.00

15 1 m2 Couttting ( Glasur batu alam )


Bahan :
Coatting 0.35000 Ltr 61,000.00 21,350.00
HCL / air keras 0.16000 Ltr 13,000.00 2,080.00
Tenaga :
Tukang cat 0.07500 Oh 57,500.00 4,312.50
Kepala Tukang 0.00800 Oh 62,500.00 500.00
Pekerja / Buruh tak terlatih 0.05000 Oh 45,000.00 2,250.00
Mandor 0.00300 Oh 68,000.00 204.00
7,266.50 23,430.00
16 1 m2 Pengecatan genteng ( 1 lapis cat dasar, 2 lapis cat penutup)
Bahan
Cat genteng 0.12000 Kg 57,000.00 6,840.00

113
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KOEFISIEN/ SAT SATUAN UPAH BAHAN
VOLUME (Rp) (Rp) (Rp)
1 3 4 5 6 7= (3x5) 8= (3x5)
Cat genteng 0.18000 Kg 57,000.00 10,260.00
Tenaga
Pekerja / Buruh tak terlatih 0.02800 Oh 45,000.00 1,260.00
Tukang cat 0.04200 Oh 57,500.00 2,415.00
Kepala Tukang 0.00420 Oh 62,500.00 262.50
Mandor 0.00250 Oh 68,000.00 170.00
4,107.50 17,100.00
17 1 m2 Pengecatan tembok interior premium
Bahan
Plamur Tembok 0.10000 Kg 9,800.00 980.00
Cat Tembok interior premium 0.10000 Kg 62,000.00 6,200.00
Cat Tembok interior premium 0.26000 Kg 62,000.00 16,120.00
Tenaga
Pekerja / Buruh tak terlatih 0.02000 Oh 45,000.00 900.00
Tukang cat 0.06300 Oh 57,500.00 3,622.50
Kepala Tukang 0.00630 Oh 62,500.00 393.75
Mandor 0.00250 Oh 68,000.00 170.00
5,086.25 23,300.00
18 1 m2 Pengecatan tembok eksterior weathershield
Bahan
Plamur Tembok 0.10000 Kg 9,800.00 980.00
Cat Tembok exterior wheathershield 0.10000 Kg 82,000.00 8,200.00
Cat Tembok exterior wheathershield 0.26000 Kg 82,000.00 21,320.00
Tenaga
Pekerja / Buruh tak terlatih 0.02000 Oh 45,000.00 900.00
Tukang cat 0.06300 Oh 57,500.00 3,622.50
Kepala Tukang 0.00630 Oh 62,500.00 393.75
Mandor 0.00250 Oh 68,000.00 170.00
5,086.25 30,500.00
19 1 m2 Pengecatan Permukaan Baja lapis seng secara manual sistem 1 lapis dengan tebal 200 um
Bahan :
Cat besi 0.30000 Kg 42,000.00 12,600.00
Tenaga :
Pekerja / Buruh tak terlatih 0.00600 Oh 45,000.00 270.00
Tukang cat 0.06000 Oh 57,500.00 3,450.00
Kepala Tukang 0.01200 Oh 62,500.00 750.00
Mandor 0.00600 Oh 68,000.00 408.00
4,878.00 12,600.00
20 1 m2 Pengecatan Permukaan Baja lapis seng secara semprot sistem 1 lapis dengan tebal 200 um
Bahan :
Cat besi 0.30000 Kg 42,000.00 12,600.00
Tenaga :
Pekerja / Buruh tak terlatih 0.40000 Oh 45,000.00 18,000.00
Tukang cat 0.70000 Oh 57,500.00 40,250.00
Kepala Tukang 0.20000 Oh 62,500.00 12,500.00
Mandor 0.20000 Oh 68,000.00 13,600.00
84,350.00 12,600.00

114
ONESIA BANGUNAN GEDUNG DAN PERUMAHAN
STRUKSI ( ABK ) TAHUN 2013 TRIWULAN 1

JUMLAH
(Rp)
9= (7+8)

535,735.00

596,685.00

115
JUMLAH
(Rp)
9= (7+8)

229,810.00

94,353.50

1,953,990.00

116
JUMLAH
(Rp)
9= (7+8)

1,432,925.00

1,848,725.00

7,900.00

1,409,300.00

271,520.00

117
JUMLAH
(Rp)
9= (7+8)

28,011.50

91,800.00

322,659.00

302,259.00

5,472.20

20,720.00

118
JUMLAH
(Rp)
9= (7+8)
27,206.00

38,039.00

32,341.00

64,750.00

42,679.00

2,590.00

26,620.00

9,932.00

25,900.00

106,940.00

119
JUMLAH
(Rp)
9= (7+8)

192,667.50

228,575.50

14,370.00

198,950.00

71,930.00

120
JUMLAH
(Rp)
9= (7+8)
108,840.00

923,550.00

764,900.00

698,300.00

682,250.00

121
JUMLAH
(Rp)
9= (7+8)

632,700.00

598,350.00

574,200.00

536,500.00

122
JUMLAH
(Rp)
9= (7+8)

556,984.50

476,035.00

652,806.00

559,388.50

123
JUMLAH
(Rp)
9= (7+8)

527,860.50

283,804.50

1,521,807.50

876,115.00

124
JUMLAH
(Rp)
9= (7+8)

1,004,988.20

656,891.80

246,683.50

125
JUMLAH
(Rp)
9= (7+8)

221,115.00

208,017.50

199,137.50

194,630.00

193,265.00

126
JUMLAH
(Rp)
9= (7+8)

190,157.25

116,705.00

105,872.50

99,631.50

127
JUMLAH
(Rp)
9= (7+8)

96,070.00

93,831.00

92,659.00

90,220.00

128
JUMLAH
(Rp)
9= (7+8)

95,502.50

86,644.00

85,922.00

836,625.00
83,662.50

129
JUMLAH
(Rp)
9= (7+8)

40,576.50

34,996.50

32,438.50

30,782.50

29,906.50

130
JUMLAH
(Rp)
9= (7+8)

29,178.50

28,218.50

31,831.00

27,983.50

30,120.00

131
JUMLAH
(Rp)
9= (7+8)

27,167.00

27,006.00

50,156.00

45,710.00

43,036.00

132
JUMLAH
(Rp)
9= (7+8)

41,020.50

39,898.00

34,574.50

52,209.00

133
JUMLAH
(Rp)
9= (7+8)

51,171.50

48,480.00

46,447.00

62,525.00

59,675.00

134
JUMLAH
(Rp)
9= (7+8)

56,258.50

52,233.00

26,208.00

24,578.00

42,419.00

135
JUMLAH
(Rp)
9= (7+8)

39,785.50

8,386.00

28,109.00

21,220.50

8,562.50

136
JUMLAH
(Rp)
9= (7+8)

27,315,410.00

23,565,400.00

13,990,400.00

13,210,400.00

11,050,400.00

137
JUMLAH
(Rp)
9= (7+8)

11,050,400.00

8,170,400.00

6,550,400.00

477,111.50

455,511.50

1,462,323.00

138
JUMLAH
(Rp)
9= (7+8)

1,025,959.00

643,775.00

619,775.00

547,775.00

547,775.00

139
JUMLAH
(Rp)
9= (7+8)

451,775.00

389,595.00

1,290,349.50

908,531.00

574,120.00

140
JUMLAH
(Rp)
9= (7+8)

553,120.00

490,120.00

490,120.00

406,120.00

351,712.50

141
JUMLAH
(Rp)
9= (7+8)

2,263,926.80

1,565,744.40

967,850.00

929,450.00

814,250.00

142
JUMLAH
(Rp)
9= (7+8)
814,250.00

660,650.00

561,162.00

2,035,922.00

1,381,376.00

808,100.00

143
JUMLAH
(Rp)
9= (7+8)

772,100.00

664,100.00

664,100.00

520,100.00

144
JUMLAH
(Rp)
9= (7+8)
426,830.00

626,530.16

439,260.00

427,500.00

392,220.00

145
JUMLAH
(Rp)
9= (7+8)

392,220.00

345,180.00

314,711.80

674,750.16

146
JUMLAH
(Rp)
9= (7+8)

487,480.00

475,720.00

440,440.00

440,440.00

147
JUMLAH
(Rp)
9= (7+8)

362,931.80

802,405.16

615,135.00

603,375.00

148
JUMLAH
(Rp)
9= (7+8)

568,095.00

568,095.00

521,055.00

149
JUMLAH
(Rp)
9= (7+8)

490,586.80

809,855.16

622,585.00

610,825.00

150
JUMLAH
(Rp)
9= (7+8)

575,545.00

575,545.00

528,505.00

151
JUMLAH
(Rp)
9= (7+8)

498,036.80

991,160.16

803,890.00

792,130.00

152
JUMLAH
(Rp)
9= (7+8)

756,850.00

756,850.00

709,810.00

679,341.80

153
JUMLAH
(Rp)
9= (7+8)

23,230,900.00

12,725,900.00

12,010,900.00

10,030,900.00

154
JUMLAH
(Rp)
9= (7+8)

10,030,900.00

5,905,900.00

22,882,660.00

12,377,660.00

11,662,660.00

155
JUMLAH
(Rp)
9= (7+8)

9,682,660.00

9,682,660.00

7,042,660.00

5,557,660.00

156
JUMLAH
(Rp)
9= (7+8)

253,615.00

139,015.00

131,215.00

109,615.00

109,615.00

157
JUMLAH
(Rp)
9= (7+8)

80,815.00

64,615.00

253,615.00

139,015.00

158
JUMLAH
(Rp)
9= (7+8)

131,215.00

109,615.00

109,615.00

80,815.00

64,615.00

159
JUMLAH
(Rp)
9= (7+8)

293,615.00

159,915.00

150,815.00

125,615.00

125,615.00

160
JUMLAH
(Rp)
9= (7+8)

92,015.00

73,115.00

293,615.00

159,915.00

161
JUMLAH
(Rp)
9= (7+8)
150,815.00

125,615.00

125,615.00

92,015.00

73,115.00

162
JUMLAH
(Rp)
9= (7+8)

3,316,658.00

1,740,908.00

1,633,658.00

1,336,658.00

1,336,658.00

163
JUMLAH
(Rp)
9= (7+8)

940,658.00

717,908.00

269,387.50

154,787.50

146,987.50

164
JUMLAH
(Rp)
9= (7+8)

125,387.50

125,387.50

96,587.50

80,387.50

491,205.00

165
JUMLAH
(Rp)
9= (7+8)

271,555.00

256,605.00

215,205.00

215,205.00

160,005.00

166
JUMLAH
(Rp)
9= (7+8)

128,955.00

577,612.50

319,762.50

302,212.50

253,612.50

167
JUMLAH
(Rp)
9= (7+8)

253,612.50

188,812.50

152,362.50

165,975.62

96,870.00

168
JUMLAH
(Rp)
9= (7+8)

92,862.50

79,590.00

79,902.50

62,310.00

51,117.60

169
JUMLAH
(Rp)
9= (7+8)

245,115.60

140,015.00

133,415.00

113,615.00

113,615.00

170
JUMLAH
(Rp)
9= (7+8)

87,215.00

70,115.50

325,339.20

186,797.50

171
JUMLAH
(Rp)
9= (7+8)
178,097.50

151,997.50

151,997.50

117,197.50

94,657.25

172
JUMLAH
(Rp)
9= (7+8)

191,144.56

108,975.00

103,815.00

88,335.00

88,335.00

173
JUMLAH
(Rp)
9= (7+8)

67,695.00

54,326.30

575,319.70

322,212.50

305,337.50

174
JUMLAH
(Rp)
9= (7+8)

257,637.50

257,637.50

194,037.50

156,831.00

175
JUMLAH
(Rp)
9= (7+8)

698,332.20

401,325.00

428,350.00

380,650.00

176
JUMLAH
(Rp)
9= (7+8)

380,650.00

317,050.00

279,843.50

288,677.20

177
JUMLAH
(Rp)
9= (7+8)

221,795.00

217,595.00

204,995.00

204,995.00

178
JUMLAH
(Rp)
9= (7+8)

188,195.00

177,313.50

32,794.65

9,056.50

741,927.50

179
JUMLAH
(Rp)
9= (7+8)

719,677.50

686,677.50

738,827.50

84,573.00

180
JUMLAH
(Rp)
9= (7+8)

1,215,750.00

1,227,350.00

825,627.50

900,027.50

837,677.50

181
JUMLAH
(Rp)
9= (7+8)

952,127.50

1,056,577.50

986,112.50

938,062.50

182
JUMLAH
(Rp)
9= (7+8)

1,029,262.50

1,064,312.50

1,311,262.50

12,577.65

139,715.00

183
JUMLAH
(Rp)
9= (7+8)

152,715.00

273,895.50

282,595.50

184
JUMLAH
(Rp)
9= (7+8)

358,795.50

248,545.50

100,623.50

3,350,382.50

185
JUMLAH
(Rp)
9= (7+8)

4,202,172.50

7,250,200.00

186
JUMLAH
(Rp)
9= (7+8)

5,560,356.50

5,250,980.00

187
JUMLAH
(Rp)
9= (7+8)
4,960,074.00

5,151,773.50

61,809.00

188
JUMLAH
(Rp)
9= (7+8)

73,372.50

152,215.00

180,000.00

47,106.50

52,106.50

189
JUMLAH
(Rp)
9= (7+8)

49,506.50

71,386.00

39,128.50

36,926.00

42,342.00

190
JUMLAH
(Rp)
9= (7+8)

32,992.00

58,335.00

141,043.00

147,151.50

80,420.00

191
JUMLAH
(Rp)
9= (7+8)

64,930.50

57,153.00

25,596.50

20,981.50

192
JUMLAH
(Rp)
9= (7+8)

16,744.50

33,643.00

49,447.00

36,037.50

22,155.50

193
JUMLAH
(Rp)
9= (7+8)

32,655.50

1,256,192.50

593,692.50

351,580.00

248,080.00

194
JUMLAH
(Rp)
9= (7+8)

490,250.00

421,850.00

330,180.00

360,080.00

195
JUMLAH
(Rp)
9= (7+8)

1,565,377.15

757,600.00

96,567.70

146,723.20

196
JUMLAH
(Rp)
9= (7+8)

154,973.20

182,473.20

193,473.20

220,973.20

197
JUMLAH
(Rp)
9= (7+8)

319,533.20

364,144.25

347,813.00

198
JUMLAH
(Rp)
9= (7+8)

514,224.00

40,788.85

58,388.85

58,388.85

199
JUMLAH
(Rp)
9= (7+8)

30,928.50

33,253.50

44,103.50

65,527.20

94,202.20

200
JUMLAH
(Rp)
9= (7+8)

119,002.20

19,303.50

23,953.50

28,603.50

41,114.70

201
JUMLAH
(Rp)
9= (7+8)

45,764.70

57,389.70

69,706.15

13,782.40

15,642.40

202
JUMLAH
(Rp)
9= (7+8)

17,812.40

149,717.40

38,111.10

53,307.40

68,330.05

203
JUMLAH
(Rp)
9= (7+8)

93,905.05

174,117.50

258,117.50

31,917.50

40,817.50

204
JUMLAH
(Rp)
9= (7+8)

39,617.50

44,117.50

50,117.50

22,965.00

16,565.00

205
JUMLAH
(Rp)
9= (7+8)

20,340.40

18,940.40

1,092,447.50

1,114,541.10

565,416.10

206
JUMLAH
(Rp)
9= (7+8)

784,541.10

64,949.00

38,879.00

304,957.00

207
JUMLAH
(Rp)
9= (7+8)

114,947.50

168,087.50

157,622.50

148,322.50

95,165.00

208
JUMLAH
(Rp)
9= (7+8)

193,654.00

261,654.00

386,554.00

16,988.50

18,088.50

209
JUMLAH
(Rp)
9= (7+8)

60,688.50

111,088.50

122,588.50

22,488.50

32,288.50

210
JUMLAH
(Rp)
9= (7+8)
65,688.50

134,188.50

20,288.50

41,788.50

50,095.00

128,795.00

211
JUMLAH
(Rp)
9= (7+8)

614,995.00

653,795.00

310,654.00

68,588.50

70,788.50

212
JUMLAH
(Rp)
9= (7+8)

98,288.50

3,010,318.50

104,888.50

70,935.50

127,702.00

213
JUMLAH
(Rp)
9= (7+8)

132,962.00

139,274.00

220,278.00

232,902.00

214
JUMLAH
(Rp)
9= (7+8)

307,594.00

401,222.00

313,906.00

340,206.00

215
JUMLAH
(Rp)
9= (7+8)

177,146.00

189,770.00

124,546.00

134,014.00

216
JUMLAH
(Rp)
9= (7+8)

118,234.00

126,650.00

268,670.00

263,410.00

217
JUMLAH
(Rp)
9= (7+8)

200,290.00

247,630.00

82,150.00

76,320.00

87,650.00

218
JUMLAH
(Rp)
9= (7+8)
80,830.00

96,450.00

79,950.00

83,580.00

60,150.00

62,350.00

219
JUMLAH
(Rp)
9= (7+8)

127,452.50

128,512.50

144,412.50

187,872.50

220
JUMLAH
(Rp)
9= (7+8)

263,132.50

283,272.50

168,690.00

281,040.00

239,040.00

221
JUMLAH
(Rp)
9= (7+8)

191,790.00

328,290.00

176,040.00

165,540.00

222
JUMLAH
(Rp)
9= (7+8)

254,790.00

162,285.00

207,540.00

181,290.00

162,915.00

223
JUMLAH
(Rp)
9= (7+8)

62,584.04

50,141.00

97,326.00

8,620.00

224
JUMLAH
(Rp)
9= (7+8)

27,501.25

31,272.50

41,167.50

12,302.00

225
JUMLAH
(Rp)
9= (7+8)
33,066.00

6,833.00

24,189.00

13,986.25

10,707.50

226
JUMLAH
(Rp)
9= (7+8)

15,949.00

32,922.75

10,707.50
13,384.38

13,986.25
17,482.81

30,696.50

227
JUMLAH
(Rp)
9= (7+8)

21,207.50

28,386.25

35,586.25

17,478.00

96,950.00

228
REKAPITULASI
STANDAR NASIONAL INDONESIA BANGUNAN GEDUNG DAN PERUMAHAN
ANALISA BIAYA KONSTRUKSI ( ABK ) TAHUN 2013 TRIWULAN 1

PROPINSI : JAWA TIMUR


KABUPATEN : TULUNGAGUNG
SISTEM : KONTRAK
HARGA : ATAS

HARGA SATUAN
NO. URAIAN KET.
( Rp )
1 3 4 5

I. PEKERJAAN PERSIAPAN
1 1 m` Pagar sementara dari kayu tinggi 2 meter. 535,735.00
2 1 m` Pagar sementara dari seng gelombang tinggi 2 meter. 596,685.00
3 1 m` Pagar sementara dari kawat duri tinggi 1,8 meter 229,810.00
4 1 m` Pengukuran dan pemasangan bouwplank 94,353.50
5 1 m2 Pembuatan kantor sementara, dengan lantai plesteran 1,953,990.00
6 1 m2 Pembuatan gudang semen dan alat-alat 1,432,925.00
7 1 m2 Pembuatan rumah jaga/konstruksi kayu 1,848,725.00
8 1 m2 Membersihkan lapangan dan perataan 7,900.00
9 1 m2 Pembuatan bedeng buruh 1,409,300.00
10 1 m2 Pembuatan bak adukan ukuran (40 x 50 x 20) cm 271,520.00
11 1 m2 Pembuatan Stegger dari bambu ukuran (40 x 50 x 20) cm 28,011.50
12 1 m2 Pembuatan jalan sementara/menuju bedeng 91,800.00
13 1 m3 Bongkaran beton bertulang 322,659.00
14 1 m3 Bongkaran dinding tembok bata merah 302,259.00
15 1 m’ Pasang pagar kawat jaring galvanis, tinggi 1,00 m 5,472.20

II. PEKERJAAN TANAH


1 1 m3 Galian tanah biasa sedalam 1 meter. 20,720.00
2 1 m3 Galian tanah biasa sedalam 2 meter. 27,206.00
3 1 m3 Galian tanah biasa sedalam 3 meter. 38,039.00
4 1 m3 Galian tanah keras sedalam 1 meter. 32,341.00
5 1 m3 Galian tanah cadas sedalam 1 meter. 64,750.00
6 1 m3 Galian tanah lumpur sedalam 1 meter. 42,679.00
7 1 m2 Pekerjaan stripping setinggi 1 meter. 2,590.00
8 1 m3 Pembuangan tanah sejauh 150 meter. 26,620.00
9 1 m3 Urugan kembali. 9,932.00
10 1 m3 Pemadatan Tanah. 25,900.00
11 1 m3 Urugan pasir. 106,940.00
12 1 m3 Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL. 192,667.50
13 1 m3 Lapisan pudel campuran 1 Kp: 5 TL. 228,575.50
14 1 m3 Pemasangan lapisan ijuk. 14,370.00
15 1 m3 Urugan sirtu. 198,950.00
16 1 m3 Pekerjaan Urugan tanah dan pemadatan 71,930.00
17 1 m2 Pembuatan jalan proyek/sementara, tebal 25 cm. 108,840.00

III. PEKERJAAN PONDASI


1 1 m3 Pasang pondasi batu kali, 1 Pc : 1 Ps 923,550.00
2 1 m3 Pasang pondasi batu kali, 1 Pc : 2 Ps. 764,900.00
3 1 m3 Pasang pondasi batu kali, 1 Pc : 2,5 Ps. 698,300.00

1
1 3 4 5
4 1 m3 Pasang pondasi batu kali, 1 Pc : 3 Ps 682,250.00
5 1 m3 Pasang pondasi batu kali, 1 Pc : 4 Ps. 632,700.00
6 1 m3 Pasang pondasi batu kali, 1 Pc : 5 Ps. 598,350.00
7 1 m3 Pasang pondasi batu kali, 1 Pc : 6 Ps. 574,200.00
8 1 m3 Pasang pondasi batu kali, 1 Pc : 8 Ps. 536,500.00
9 1 m3 Pasang pondasi batu kali, 1 Kp : 1 Sm : 1 Ps. 556,984.50
10 1 m3 Pasang pondasi batu kali, 1 Kp : 1 SM : 2 Ps. 476,035.00
11 1 m3 Pasang pondasi batu kali, 1 Pc : ¼ Kp : 4 Ps. 652,806.00
12 1 m3 Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps. 559,388.50
13 1 m3 Pasang pondasi batu kali, ¼ Pc : 1 Kp : 4 Ps. 527,860.50
14 1 m3 Pasang pondasi batu kosong 283,804.50
15 1 m3 Pasang pondasi siklop 40% batu kali 1,521,807.50
16 1 m3 Pasang pondasi sumuran diameter 100 Cm. 876,115.00
17 1 m' Pembuatan tiang pancang (40 X 40) Cm, beton bertulang 1,004,988.20
18 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang 656,891.80

IV. PEKERJAAN DINDING


1 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps 246,683.50
2 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps. 221,115.00
3 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps 208,017.50
4 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps 199,137.50
5 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps 194,630.00
6 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps 193,265.00
7 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps 190,157.25
8 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 1 Ps 116,705.00
9 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 2 Ps 105,872.50
10 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps 99,631.50
11 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 4 Ps 96,070.00
12 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 5 P 93,831.00
13 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 6 Ps 92,659.00
14 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 8 Ps 90,220.00
15 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Kp : 10 Ps 95,502.50
16 1 m2 Pasangan bata merah tebal ½ bata, 1 Kp : 1 Sm : 1 Ps 86,644.00
17 1 m2 Pasangan bata merah tebal ½ bata, 1 Kp : 1 Sm : 2 Ps 85,922.00
18 1 m3 Pasangan bataco 1 Pc : 3 Psr 83,662.50

V. PEKERJAAN PLESTERAN
1 1 m2 Plesteran 1 Pc : 1 Ps, tebal 15 mm. 40,576.50
2 1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm. 34,996.50
3 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm. 32,438.50
4 1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm. 30,782.50
5 1 m2 Plesteran 1 Pc : 5 Ps, tebal 15 mm. 29,906.50
6 1 m2 Plesteran 1 Pc : 6 Ps, tebal 15 mm. 29,178.50
7 1 m2 Plesteran 1 Pc : 8 Ps, tebal 15 mm. 28,218.50
8 1 m2 Plesteran 1 Pc : 0,5 Kp : 3 Ps, tebal 15 mm. 31,831.00
9 1 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm. 27,983.50
10 1 m2 Plesteran 0,5 Pc : 1 Kp : 4 Ps, tebal 15 mm. 30,120.00
11 1 m2 Plesteran 1 Kp : 1 Sm : 1 Ps, tebal 15 mm. 27,167.00
12 1 m2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm. 27,006.00
13 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm. 50,156.00
14 1 m2 Plesteran 1 Pc : 3 Ps, tebal 20 mm. 45,710.00
15 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm. 43,036.00

2
1 3 4 5
16 1 m2 . Plesteran 1 Pc : 5 Ps, tebal 20 mm 41,020.50
17 1 m2 Plesteran 1 Pc : 6 Ps, tebal 20 mm. 39,898.00
18 1 m2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mm. 34,574.50
19 1 m2 Plesteran 1 Pc : 2 Ps, tebal 25 mm. 52,209.00
20 1 m2 Plesteran 1 Pc : 3 Ps, tebal 25 mm. 51,171.50
21 1 m2 Plesteran 1 Pc : 4 Ps, tebal 25 mm. 48,480.00
22 1 m2 Plesteran 1 Pc : 5 Ps, tebal 25 mm. 46,447.00
23 1 m2 Plesteran 1 Pc : 2 Ps, tebal 30 mm. 62,525.00
24 1 m2 Plesteran 1 Pc : 3 Ps, tebal 30 mm. 59,675.00
25 1 m2 Plesteran 1 Pc : 4 Ps, tebal 30 mm. 56,258.50
26 1 m2 Plesteran 1 Pc : 5 Ps, tebal 30 mm. 52,233.00
27 1 m2 Berapen 1 Pc : 3 Ps, tebal 30 mm. 26,208.00
28 1 m2 Berapen 1 Pc : 5 Ps, tebal 15 mm. 24,578.00
29 1 m2 Plesteran Beton 1 Pc : 2 Ps, tebal 15 mm. 42,419.00
30 1 m2 Plesteran Beton 1 Pc : 3 Ps, tebal 15 mm. 39,785.50
31 1 m2 Plesteran Skoning 1 Pc : 2 Ps. 8,386.00
32 1 m2 Plesteran Ciprat. 1 Pc : 2 Ps 28,109.00
33 1 m2 Plesteran siar adukan 1 pc : 2 ps 21,220.50
34 1 m' Benangan / Tali Air / Sudut Kol kolan 1 pc : 3 ps 8,562.50

VI. PEKERJAAN KAYU


1 1 m3 Pasang kusen pintu dan jendela kayu jati eks Bojonegoro 27,315,410.00
2 1 m3 Pasang kusen pintu dan jendela kayu jati 23,565,400.00
3 1 m3 Pasang kusen pintu dan jendela kayu kamper. 13,990,400.00
4 1 m3 Pasang kusen pintu dan jendela kayu balau 13,210,400.00
5 1 m3 Pasang kusen pintu dan jendela kayu kempas 11,050,400.00
6 1 m3 Pasang kusen pintu dan jendela kayu kruing 11,050,400.00
7 1 m3 Pasang kusen pintu dan jendela kayu Meranti 8,170,400.00
8 1 m3 Pasang kusen pintu dan jendela kayu Akasia 6,550,400.00
9 1 m2 Pasang pintu klamp kayu kamper 477,111.50
10 1 m2 Pasang pintu klamp kayu balau 455,511.50
11 1 m2 Pasang pintu panel kayu jati eks Bojonegoro 1,462,323.00
12 1 m2 Pasang pintu panel kayu jati 1,025,959.00
13 1 m2 Pasang pintu panel kayu kanfer 643,775.00
14 1 m2 Pasang pintu panel kayu balau 619,775.00
15 1 m2 Pasang pintu panel kayu Kruing 547,775.00
16 1 m2 Pasang pintu panel kayu Kempas 547,775.00
17 1 m2 Pasang pintu panel kayu Meranti 451,775.00
18 1 m2 Pasang pintu panel kayu Akasia 389,595.00
19 1 m2 Pasang pintu dan jendela kaca kayu jati eks Bojonegoro 1,290,349.50
20 1 m2 Pasang pintu dan jendela kaca kayu jati 908,531.00
21 1 m2 Pasang pintu dan jendela kaca kayu kamper 574,120.00
22 1 m2 Pasang pintu dan jendela kaca kayu balau 553,120.00
23 1 m2 Pasang pintu dan jendela kaca kayu kempas 490,120.00
24 1 m2 Pasang pintu dan jendela kaca kayu kruing 490,120.00
25 1 m2 Pasang pintu dan jendela kaca kayu meranti 406,120.00
26 1 m2 Pasang pintu dan jendela kaca kayu Akasia 351,712.50
27 1 m2 Pasang pintu dan jendela jalusi kayu jati eks Bojonegoro 2,263,926.80
28 1 m2 Pasang pintu dan jendela jalusi kayu jati 1,565,744.40
29 1 m2 Pasang pintu dan jendela jalusi kayu kamper 967,850.00
30 1 m2 Pasang pintu dan jendela jalusi kayu balau 929,450.00
31 1 m2 Pasang pintu dan jendela jalusi kayu kruing 814,250.00

3
1 3 4 5
32 1 m2 Pasang pintu dan jendela jalusi kayu kempas 814,250.00
33 1 m2 Pasang pintu dan jendela jalusi kayu meranti 660,650.00
34 1 m2 Pasang pintu dan jendela jalusi kayu Akasia 561,162.00
35 1 m2 Pasang jalusi mati kusen kayu jati eks Bojonegoro 2,035,922.00
36 1 m2 Pasang jalusi mati kusen kayu jati 1,381,376.00
37 1 m2 Pasang jalusi mati kusen kayu kanfer 808,100.00
38 1 m2 Pasang jalusi mati kusen kayu balau 772,100.00
39 1 m2 Pasang jalusi mati kusen kayu kempas 664,100.00
40 1 m2 Pasang jalusi mati kusen kayu kruing 664,100.00
41 1 m2 Pasang jalusi mati kusen kayu meranti 520,100.00
42 1 m2 Pasang jalusi mati kusen kayu Akasia 426,830.00
43 1 m2 Pasang pintu plywood rangkap, rangka kayu jati 626,530.16
44 1 m2 Pasang pintu plywood rangkap, rangka kayu kamper 439,260.00
45 1 m2 Pasang pintu plywood rangkap, rangka kayu balau 427,500.00
46 1 m2 Pasang pintu plywood rangkap, rangka kayu kempas 392,220.00
47 1 m2 Pasang pintu plywood rangkap, rangka kayu kruing 392,220.00
48 1 m2 Pasang pintu plywood rangkap, rangka kayu meranti 345,180.00
49 1 m2 Pasang pintu plywood rangkap, rangka kayu akasia 314,711.80
50 1 m2 Pasang pintu teakwood rangkap, rangka kayu jati 674,750.16
51 1 m2 Pasang pintu teakwood rangkap, rangka kayu kamper 487,480.00
52 1 m2 Pasang pintu teakwood rangkap, rangka kayu balau 475,720.00
53 1 m2 Pasang pintu teakwood rangkap, rangka kayu kempas 440,440.00
54 1 m2 Pasang pintu teakwood rangkap, rangka kayu kruing 440,440.00
55 1 m2 Pasang pintu teakwood rangkap, rangka kayu Akasia 362,931.80
56 1 m2 Pasang pintu plywood & formika, rangka kayu jati 802,405.16
57 1 m2 Pasang pintu plywood & formika rangka kayu kamper 615,135.00
58 1 m2 Pasang pintu plywood & formika rangka kayu balau 603,375.00
59 1 m2 Pasang pintu plywood & formika rangka kayu kempas 568,095.00
60 1 m2 Pasang pintu plywood & formika rangka kayu kruing 568,095.00
61 1 m2 Pasang pintu plywood & formika rangka kayu meranti 521,055.00
62 1 m2 Pasang pintu plywood & formika rangka kayu akasia 490,586.80
63 1 m2 Pasang pintu teakwood & formika rangka kayu jati ( divernis ) 809,855.16
64 1 m2 Pasang pintu teakwood & formika rangka kayu kamper ( divernis ) 622,585.00
65 1 m2 Pasang pintu teakwood & formika rangka kayu balau ( divernis ) 610,825.00
66 1 m2 Pasang pintu teakwood & formika rangka kayu kempas ( divernis ) 575,545.00
67 1 m2 Pasang pintu teakwood & formika rangka kayu kruing ( divernis ) 575,545.00
68 1 m2 Pasang pintu teakwood & formika rangka kayu meranti ( divernis ) 528,505.00
69 1 m2 Pasang pintu teakwood & formika rangka kayu akasia ( divernis ) 498,036.80
70 1 m2 Pasang pintu formika double, rangka kayu jati 991,160.16
71 1 m2 Pasang pintu formika double, rangka kayu kamper 803,890.00
72 1 m2 Pasang pintu formika double, rangka kayu balau 792,130.00
73 1 m2 Pasang pintu formika double, rangka kayu kempas 756,850.00
74 1 m2 Pasang pintu formika double, rangka kayu kruing 756,850.00
75 1 m2 Pasang pintu formika double, rangka kayu meranti 709,810.00
76 1 m2 Pasang pintu formika double, rangka kayu akasia 679,341.80
77 1 m3 Pasang konstruksi kuda-kuda kayu jati 23,230,900.00
78 1 m3 Pasang konstruksi kuda-kuda kayu kamper 12,725,900.00
79 1 m3 Pasang konstruksi kuda-kuda kayu balau 12,010,900.00
80 1 m3 Pasang konstruksi kuda-kuda kayu kempas 10,030,900.00
81 1 m3 Pasang konstruksi kuda-kuda kayu kruing 10,030,900.00
82 1 m3 Pasang konstruksi kuda-kuda kayu Akasia 5,905,900.00
83 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu jati 22,882,660.00

4
1 3 4 5
84 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu kanfer 12,377,660.00
85 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Balau 11,662,660.00
86 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Kempas 9,682,660.00
87 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Kruing 9,682,660.00
88 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Meranti 7,042,660.00
89 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Akasia 5,557,660.00
90 1 m2 Pasang kaso + reng genteng kodok kayu jati 253,615.00
91 1 m2 Pasang kaso + reng genteng kodok kayu kamper 139,015.00
92 1 m2 Pasang kaso + reng genteng kodok kayu balau 131,215.00
93 1 m2 Pasang kaso + reng genteng kodok kayu kempas 109,615.00
94 1 m2 Pasang kaso + reng genteng kodok kayu kruing 109,615.00
95 1 m2 Pasang kaso + reng genteng kodok kayu meranti 80,815.00
96 1 m2 Pasang kaso + reng genteng kodok kayu Akasia 64,615.00
97 1 m2 Pasang kaso + reng genteng MKP lokal kayu jati 253,615.00
98 1 m2 Pasang kaso + reng genteng MKP lokal kayu kamper 139,015.00
99 1 m2 Pasang kaso + reng genteng MKP lokal kayu balau 131,215.00
100 1 m2 Pasang kaso + reng genteng MKP lokal kayu kempas 109,615.00
101 1 m2 Pasang kaso + reng genteng MKP lokal kayu kruing 109,615.00
102 1 m2 Pasang kaso + reng genteng MKP lokal kayu meranti 80,815.00
103 1 m2 Pasang kaso + reng genteng MKP lokal kayu Akasia 64,615.00
104 1 m2 Pasang kaso + reng genteng monier kayu jati 293,615.00
105 1 m2 Pasang kaso + reng genteng monier kayu kamper 159,915.00
106 1 m2 Pasang kaso + reng genteng monier kayu balau 150,815.00
107 1 m2 Pasang kaso + reng genteng monier kayu kempas 125,615.00
108 1 m2 Pasang kaso + reng genteng monier kayu kruing 125,615.00
109 1 m2 Pasang kaso + reng genteng monier kayu meranti 92,015.00
110 1 m2 Pasang kaso + reng genteng monier kayu Akasia 73,115.00
111 1 m2 Pasang kaso + reng genteng beton kayu jati 293,615.00
112 1 m2 Pasang kaso + reng genteng beton kayu kanfer 159,915.00
113 1 m2 Pasang kaso + reng genteng beton kayu balau 150,815.00
114 1 m2 Pasang kaso + reng genteng beton kayu kempas 125,615.00
115 1 m2 Pasang kaso + reng genteng beton kayu kruing 125,615.00
116 1 m2 Pasang kaso + reng genteng beton kayu meranti 92,015.00
117 1 m2 Pasang kaso + reng genteng beton kayu Akasia 73,115.00
118 1 m2 Pasang kaso + reng atap sirap kayu jati 3,316,658.00
119 1 m2 Pasang kaso + reng atap sirap kayu kamper 1,740,908.00
120 1 m2 Pasang kaso + reng atap sirap kayu balau 1,633,658.00
121 1 m2 Pasang kaso + reng atap sirap kayu kempas 1,336,658.00
122 1 m2 Pasang kaso + reng atap sirap kayu kruing 1,336,658.00
123 1 m2 Pasang kaso + reng atap sirap kayu meranti 940,658.00
124 1 m2 Pasang kaso + reng atap sirap kayu Akasia 717,908.00
125 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu jati 269,387.50
126 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kamper 154,787.50
127 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu balau 146,987.50
128 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kempas 125,387.50
129 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kruing 125,387.50
130 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu meranti 96,587.50
131 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu Akasia 80,387.50
132 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu jati 491,205.00
133 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kamper 271,555.00
134 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu balau 256,605.00
135 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kempas 215,205.00

5
1 3 4 5
136 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kruing 215,205.00
137 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu meranti 160,005.00
138 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu Akasia 128,955.00
139 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu jati 577,612.50
140 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kamper 319,762.50
141 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu balau 302,212.50
142 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kempas 253,612.50
143 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kruing 253,612.50
144 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu meranti 188,812.50
145 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu Akasia 152,362.50
146 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu jati. 165,975.62
147 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kamper 96,870.00
148 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu balau 92,862.50
149 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kempas 79,590.00
150 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kruing 79,902.50
151 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu meranti 62,310.00
152 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu Akasia 51,117.60
153 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu jati 245,115.60
154 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kamper 140,015.00
155 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu balau 133,415.00
156 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kempas 113,615.00
157 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kruing 113,615.00
158 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu meranti 87,215.00
159 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu Akasia 70,115.50
160 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu jati 325,339.20
161 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kamper 186,797.50
162 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu balau 178,097.50
163 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kempas 151,997.50
164 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kruing 151,997.50
165 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu meranti 117,197.50
166 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu Akasia 94,657.25
167 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu jati 191,144.56
168 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kanfer 108,975.00
169 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu balau 103,815.00
170 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kempas 88,335.00
171 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kruing 88,335.00
172 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu meranti 67,695.00
173 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu Akasia 54,326.30
174 1 m2 Pasang rangka dinding pemisah kayu jati 575,319.70
175 1 m2 Pasang rangka dinding pemisah kayu kanfer 322,212.50
176 1 m2 Pasang rangka dinding pemisah kayu balau 305,337.50
177 1 m2 Pasang rangka dinding pemisah kayu kempas 257,637.50
178 1 m2 Pasang rangka dinding pemisah kayu kruing 257,637.50
179 1 m2 Pasang rangka dinding pemisah kayu meranti 194,037.50
180 1 m2 Pasang rangka dinding pemisah kayu tahun / akasia 156,831.00
181 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu jati 698,332.20
182 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kamper 401,325.00
183 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu balau 428,350.00
184 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kempas 380,650.00
185 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kruing 380,650.00
186 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu meranti 317,050.00
187 1 m2 Pasang dinding pemisah plywood rangkap, rangka Akasia 279,843.50

6
1 3 4 5
188 1 m2 Pasang dinding lambriziring dari papan jati 288,677.20
189 1 m2 Pasang dinding lambriziring dari papan kanfer 221,795.00
190 1 m2 Pasang dinding lambriziring dari papan balau 217,595.00
191 1 m2 Pasang dinding lambriziring dari papan kempas 204,995.00
192 1 m2 Pasang dinding lambriziring dari papan kruing 204,995.00
193 1 m2 Pasang dinding lambriziring dari papan meranti 188,195.00
194 1 m2 Pasang dinding lambriziring dari papan akasia 177,313.50
195 1 m2 Pasang plywood tebal 4 mm, untuk dinding 32,794.65
196 1 m’ Pasang list plafond -kayu profil 9,056.50

VII. PEKERJAAN BETON


1 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 5 Kr 741,927.50
2 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 6 Kr 719,677.50
3 1 m3 Membuat beton tumbuk 1 Pc : 4 Ps : 6 Kr 686,677.50
4 1 m3 Membuat beton tumbuk 1 Pc : 2 Ps : 3 Kr. 738,827.50
5 1 m2 Membuat lantai kerja beton tumbuk 1 Pc : 3 Ps : 5 Kr, tebal 5 cm 84,573.00
6 1 m3 Membuat beton dengan mutu K 225 1,215,750.00
7 1 m3 Membuat beton dengan mutu K 275 1,227,350.00
8 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 4 Kr. 825,627.50
9 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 2,5 Kr. 900,027.50
10 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 3 Kr. 837,677.50
11 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 2,5 Kr. 952,127.50
12 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 2 Kr. 1,056,577.50
13 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr. 986,112.50
14 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 4 split 938,062.50
15 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 3 split 1,029,262.50
16 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 2,5 split 1,064,312.50
17 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 1 Kr. 1,311,262.50
18 1 Kg Pembesian dengan besi polos atau besi ulir 12,577.65
19 1 m2 Pasang bekisting untuk pondasi 139,715.00
20 1 m2 Pasang bekisting untuk sloof 152,715.00
21 1 m2 Pasang bekisting untuk kolom 273,895.50
22 1 m2 Pasang bekisting untuk balok 282,595.50
23 1 m2 Pasang bekisting untuk lantai 358,795.50
24 1 m2 Pasang bekisting untuk tangga 248,545.50
25 1 m2 Pasang jembatan cor 100,623.50
26 1 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting). 3,350,382.50
27 1 m3 Membuat sloof beton bertulang (200 kg besi + bekisting). 4,202,172.50
28 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting). 7,250,200.00
29 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting). 5,560,356.50
30 1 m3 Membuat balok beton bertulang (150 kg besi + bekisting). 5,250,980.00
31 1 m3 Membuat dinding beton bertulang (150 kg besi + bekisting). 4,960,074.00
32 1 m3 Membuat tangga beton bertulang (200 kg besi + bekisting). 5,151,773.50
33 1 m’ Membuat kolom penguat beton bertulang (11 x 11) cm. 61,809.00
34 1 m’ Membuat ring balok beton bertulang (10 x 15) cm. 73,372.50
35 1 m3 Membuat Bekisting 152,215.00
36 1 m3 Membongkar bekisting dan perawatan beton 180,000.00

VIII. PEKERJAAN PENUTUP ATAP


1 1 m2 Pasang atap genteng press biasa 47,106.50
2 1 m2 Pasang atap genteng MKP lokal 52,106.50
3 1 m2 Pasang atap genteng Mantili 49,506.50

7
1 3 4 5
4 1 m’ Pasang bubung genteng MKP Lokal 71,386.00
5 1 m2 Pasang atap asbes gelombang besar (3,00 x 1,05 m) x 4 mm 39,128.50
6 1 m2 Pasang atap asbes gelombang kecil (1,80 x 1,05 m) x 4 mm 36,926.00
7 1 m’ Pasang bubung stel gelombang besar 42,342.00
8 1 m’ Pasang bubung stel gelombang kecil 32,992.00
9 1 m2 Pasang atap genteng beton 58,335.00
10 1 m2 Pasang atap genteng metal 141,043.00
11 1 m2 Pasang atap sirap 147,151.50
12 1 m’ Pasang nok genteng beton 80,420.00
13 1 m’ Pasang nok sirap 64,930.50
14 1 m2 Pasang atap seng gelombang 57,153.00
15 1 m2 Pasang atap nok seng 25,596.50
16 1 m2 Pasang aluminium foil / sisalation 20,981.50

IX. PEKERJAAN LANGIT - LANGIT


1 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 4 mm 16,744.50
2 1 m2 Langit-langit plywood (30 x 60) cm, tebal 4 mm 33,643.00
3 1 m2 Langit-langit teakwood (30 x 60) cm, tebal 4 mm 49,447.00
4 1 m2 Langit-langit gypsum board, tebal 9 mm 36,037.50
5 1 m' List Plafond Gypsum Kecil 22,155.50
6 1 m' List Plafond Gypsum Besar 32,655.50

X. PEKERJAAN SANITASI
1 1 bh Memasang kloset duduk/monoblok 1,256,192.50
2 1 bh Memasang kloset duduk keramik 593,692.50
3 1 bh Memasang kloset jongkok porselen 351,580.00
4 1 bh Memasang kloset jongkok teraso 248,080.00
5 1 bh Memasang urinoir 490,250.00
6 1 bh Memasang wastafel 421,850.00
7 1 bh Memasang bak mandi teraso volume 0,30 m3 330,180.00
8 1 bh Memasang bak mandi Fibreglass volume 0,30 m3 360,080.00
9 1 bh Memasang badkip porselen 1,565,377.15
10 1 bh Memasang bak fibreglass volume 1 m3 air 757,600.00
11 1 m' Memasang pipa beton, diameter 15 cm - 20cm 96,567.70
12 1 m' Memasang pipa beton, diameter 30 cm 146,723.20
13 1 m' Memasang pipa beton, diameter 40 cm 154,973.20
14 1 m' Memasang pipa beton, diameter 50 cm 182,473.20
15 1 m' Memasang pipa beton, diameter 60 cm 193,473.20
16 1 m' Memasang pipa beton, diameter 80 cm 220,973.20
17 1 m' Memasang pipa beton, diameter 100 cm 319,533.20
18 1 bh Memasang bak kontrol pasangan batu bata ukuran (30 x30) cm, tinggi 35 cm 364,144.25
19 1 bh Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm 347,813.00
20 1 bh Memasang bak kontrol pasangan batu bata ukuran (60x60) cm, tinggi 65 cm 514,224.00
21 1 m' Memasang buis beton 1/2 lingkaran dia 20 cm 40,788.85
22 1 m' Memasang buis beton 1/2 lingkaran dia 30 cm 58,388.85
23 1 m' Memasang buis beton 1/2 lingkaran dia 40 cm 58,388.85
24 1 m' Memasang pipa galvanis diameter 1” tebal 0,8 mm 30,928.50
25 1 m' Memasang pipa galvanis diameter 1,5” tebal 0,8 mm 33,253.50
26 1 m' Memasang pipa galvanis diameter 2” tebal 0,8 mm 44,103.50
27 1 m' Memasang pipa galvanis diameter 2,5” tebal 0,8 mm 65,527.20
28 1 m' Memasang pipa galvanis diameter 3” tebal 0,8 mm 94,202.20
29 1 m' Memasang pipa galvanis diameter 4” tebal 0,8 mm 119,002.20

8
1 3 4 5
30 1 m' Memasang pipa GIP BSA diameter ½” 19,303.50
31 1 m' Memasang pipa GIP BSA diameter ¾” 23,953.50
32 1 m' Memasang pipa GIP BSA diameter 1” 28,603.50
33 1 m' Memasang pipa GIP BSA diameter 1½” 41,114.70
34 1 m' Memasang pipa GIP BSA diameter 2” 45,764.70
35 1 m' Memasang pipa GIP BSA diameter 3” 57,389.70
36 1 m' Memasang pipa GIP BSA diameter 4” 69,706.15
37 1 m' Memasang pipa PVC tipe AW diameter ½” 13,782.40
38 1 m' Memasang pipa PVC tipe AW diameter ¾” 15,642.40
39 1 m' Memasang pipa PVC tipe AW diameter 1” 17,812.40
40 1 m' Memasang pipa PVC tipe AW diameter 5” 149,717.40
41 1 m' Memasang pipa PVC tipe AW diameter 2” 38,111.10
42 1 m' Memasang pipa PVC tipe AW diameter 2½ ” 53,307.40
43 1 m' Memasang pipa PVC tipe AW diameter 3 ” 68,330.05
44 1 m' Memasang pipa PVC tipe AW diameter 4 ” 93,905.05
45 1 bh Memasang kran Dupon diameter ½” 174,117.50
46 1 bh Memasang kran Toto diameter ½” 258,117.50
47 1 bh Memasang kran diameter ½” 31,917.50
48 1 bh Memasang kran diameter ¾” 40,817.50
49 1 bh Memasang stop kran diameter ½” 39,617.50
50 1 bh Memasang stop kran diameter ¾” 44,117.50
51 1 bh Memasang stop kran diameter 1” 50,117.50
52 1 bh Memasang Floor drain stainless steel 22,965.00
53 1 bh Memasang Floor drain plastik 16,565.00

XI. PEKERJAAN BESI DAN ALUMINIUM


1 1 Kg Pabrikasi dan pasang Rangka baja 20,340.40
2 1 Kg Pasang rangka atap baja 18,940.40
3 1 m2 Pasang pintu besi baja 1,092,447.50
4 1 m2 Pasang pintu lipat 1,114,541.10
5 1 m2 Pasang Rolling door 565,416.10
6 1 m2 Pasang pintu alluminium 784,541.10
7 1 m2 Pasang kawat harmonika 64,949.00
8 1 m2 Pasang kawat nyamuk 38,879.00
9 1 m2 Pasang jendela nako & tralis 304,957.00
10 1 m` Pasang talang datar, seng bjls 30 114,947.50
11 1 m` Pasang talang miring, seng bjls 30 168,087.50
12 1 m’ Pasang talang ½ lingkaran D-10 cm, seng bjls 30 157,622.50
13 1 m’ Pasang talang ½ lingkaran D-10 cm, seng bjls 20 148,322.50

XII. PEKERJAAN KUNCI DAN KACA


1 1 bh Pasang kunci tanam biasa 95,165.00
2 1 bh Pasang kunci tanam SES ( pelor ) 193,654.00
3 1 bh Pasang kunci tanam SES 261,654.00
4 1 bh Pasang selot rossete dekson 386,554.00
5 1 bh Pasang engsel jendela biasa 16,988.50
6 1 bh Pasang engsel pintu biasa 18,088.50
7 1 bh Pasang engsel stainllesstel dekson 3" 60,688.50
8 1 bh Pasang engsel stainllesstel dekson 4" 111,088.50
9 1 bh Pasang engsel stainllesstel dekson 5" 122,588.50
10 1 bh Pasang grendel pintu panjang 22,488.50
11 1 bh Pasang grendel jendela SES 32,288.50

9
1 3 4 5
12 1 bh Pasang grendel tanam SES 65,688.50
13 1 bh Pasang grendel pintu ganda dekson 40 cm 134,188.50
14 1 bh Pasang hak angin 20,288.50
15 1 bh Pasang hak angin SES 41,788.50
16 1 bh Pasang handel pintu stainlesstel kecil 50,095.00
17 1 bh Pasang handel pintu stainlesstel besar 128,795.00
18 1 bh Pasang handel pintu ganda dekson 30 cm 614,995.00
19 1 bh Pasang handel pintu ganda dekson 40 cm 653,795.00
20 1 bh Pasang rel pintu dorong 310,654.00
21 1 m2 Pasang kaca , tebal 3 mm 68,588.50
22 1 m2 Pasang kaca , tebal 5 mm 70,788.50
23 1 m2 Pasang kaca Ry band , tebal 5 mm 98,288.50
24 1 m2 Pasang kaca patri , tebal 5 mm 3,010,318.50
25 1 m2 Pasang kaca air tbl. 5 mm 104,888.50

XIII. PEKRJAAN PENUTUP LANTAI


1 1 m2 Pasang lantai ubin pc abu-abu ukuran 20x20 cm 70,935.50
2 1 m2 Pasang lantai keramik ukuran 20x20 cm 127,702.00
3 1 m2 Pasang lantai keramik tekstur ukuran 20x20 cm 132,962.00
4 1 m2 Pasang lantai keramik tekstur ukuran 30x30 cm 139,274.00
5 1 m2 Pasang lantai Granit ( ex Granito ) warna terang ukuran 40x40 cm 220,278.00
6 1 m2 Pasang lantai Granit ( ex Granito ) warna gelap ukuran 40x40 cm 232,902.00
7 1 m2 Pasang lantai Granit ( ex Granito ) tektur ukuran 40x40 cm 307,594.00
8 1 m2 Pasang lantai Granit ( ex Granito ) tektur ukuran 60x60 cm 401,222.00
9 1 m2 Pasang lantai Granit ( ex Granito ) warna terang ukuran 60x60 cm 313,906.00
10 1 m2 Pasang lantai Granit ( ex Granito ) warna gelap ukuran 60x60 cm 340,206.00
11 1 m2 Pasang lantai batu lempeng 177,146.00
12 1 m2 Pasang lantai marmer bakar 189,770.00
13 1 m2 Pasang lantai Keramik putih ukuran 40x40 cm 124,546.00
14 1 m2 Pasang lantai Keramik warna ukuran 40x40 cm 134,014.00
15 1 m2 Pasang lantai Keramik putih ukuran 30x30 cm 118,234.00
16 1 m2 Pasang lantai Keramik warna ukuran 30x30 cm 126,650.00
17 1 m2 Pasang lantai marmer 268,670.00
18 1 m2 Pasang lantai granit motif 263,410.00
19 1 m2 Pasang lantai batu candi hitam 200,290.00
20 1 m2 Pasang lantai andesit 30 x 30 cm 247,630.00
21 1 m2 Pasang Paving Stone / conblok Warna Tebal 6 Cm K225 82,150.00
22 1 m2 Pasang Paving Stone / conblok Abu-abu Tebal 6 Cm K225 76,320.00
23 1 m2 Pasang Paving Stone / conblok Warna Tebal 8 Cm K225 87,650.00
24 1 m2 Pasang Paving Stone / conblok Abu-abu Tebal 8 Cm K225 80,830.00
25 1 m2 Pasang Paving Stone / Conblok 5 Warna Uk 10 x 10 cm 96,450.00
26 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm K 300 79,950.00
27 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm K 400 83,580.00
28 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm 60,150.00
29 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 8 cm 62,350.00
30 1 m2 Pasang dinding keramik putih Uk. 20x25 cm 127,452.50
31 1 m2 Pasang dinding keramik motif Uk. 20x25 cm 128,512.50
32 1 m2 Pasang dinding keramik Uk. 20x33 cm 144,412.50
33 1 m2 Pasang dinding keramik cutting Uk. 30x50 cm 187,872.50
34 1 m2 Pasang dinding keramik Cutting Uk. 31x63 cm 263,132.50
35 1 m2 Pasang dinding keramik tekstur Cutting Uk. 31x63 cm 283,272.50
36 1 m2 Pasang dinding batu lempeng 168,690.00

10
1 3 4 5
37 1 m2 Pasang dinding batu andesit alur 281,040.00
38 1 m2 Pasang dinding batu andesit 30 x 30 cm 239,040.00
39 1 m2 Pasang dinding batu candi hitam 191,790.00
40 1 m2 Pasang dinding batu susun sirih 328,290.00
41 1 m2 Pasang dinding batu salagedang 176,040.00
42 1 m2 Pasang dinding batu paras grobongan 165,540.00
43 1 m2 Pasang dinding batu granit motif 254,790.00
44 1 m2 Pasang dinding batu marmo biasa 162,285.00
45 1 m2 Pasang dinding batu marmo warna 207,540.00
46 1 m2 Pasang dinding batu bobos 181,290.00
47 1 m2 Pasang dinding batu warna ( hias ) 162,915.00
48 1 m' Plint kayu 2 x 10 cm 62,584.04
49 1 m2 Lantai Patlag 1 Lapis Bata merah camp. 1 Sm : 1 Kpr : 3 Psr 50,141.00
50 1 m' Plint keramik uk 10 x 20 cm 97,326.00

XIV PEKERJAAN PENGECATAN


1 1 m2 Mengikis/mengerok permukaan cat tembok lama 8,620.00
2 1 m2 Pengecatan bidang kayu lama 27,501.25
3 1 m2 Pengecatan bidang kayu baru (1 lps plamir),1 lps cat dasar, 2 lps cat penutup. 31,272.50
4 1 m2 Pengecatan bidang kayu baru (1 lps plamir), 1 lps cat dasar, 3 lpis cat penutup. 41,167.50
5 1 m2 Pelaburan bidang kayu dengan teak oil 12,302.00
6 1 m2 Pelaburan bidang kayu dengan politur 33,066.00
7 1 m2 Pelaburan bidang kayu dengan cat residu dan ter 6,833.00
8 1 m2 Pelaburan bidang kayu dengan vernis 24,189.00
9 1 m2 Pengecatan tembok baru (1 lapis plamir,1 lapis cat dasar, 2 lapis cat penutup) 13,986.25
10 1 m2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) 10,707.50
11 1 m2 Pegecatan permukaan baja dengan meni besi 15,949.00
12 1 m2 Pegecatan permukaan baja dengan meni besi dan perancah 32,922.75
13 1 m2 Pengecatan Plafond lama (1 lapis cat dasar, 2 lapis cat penutup) 13,384.38
14 1 m2 Pengecatan Plafond baru (1 lapis plamir,1 lapis cat dasar, 2 lapis cat penutup) 17,482.81
15 1 m2 Couttting ( Glasur batu alam ) 30,696.50
16 1 m2 Pengecatan genteng ( 1 lapis cat dasar, 2 lapis cat penutup) 21,207.50
17 1 m2 Pengecatan tembok interior premium 28,386.25
18 1 m2 Pengecatan tembok eksterior weathershield 35,586.25
19 1 m2 Pengecatan Permukaan Baja lapis seng secara manual sistem 1 lapis dengan tebal 200 um 17,478.00
20 1 m2 Pengecatan Permukaan Baja lapis seng secara semprot sistem 1 lapis dengan tebal 200 um 96,950.00

11
REKAPITULASI HARGA SATUAN ANALISA
STANDAR NASIONAL INDONESIA BANGUNAN GEDUNG DAN PERUMAHAN
ANALISA BIAYA KONSTRUKSI ( ABK ) TAHUN 2013 TRIWULAN 1

PROPINSI : JAWA TIMUR


KABUPATEN : TULUNGAGUNG

HARGA BAWAH HARGA ATAS


NO. URAIAN
Rp. Rp.
1 2 3 4

I. PEKERJAAN PERSIAPAN
1 1 m` Pagar sementara dari kayu tinggi 2 meter. 521,465.00 535,735.00
2 1 m` Pagar sementara dari seng gelombang tinggi 2 meter. 581,815.00 596,685.00
3 1 m` Pagar sementara dari kawat duri tinggi 1,8 meter 218,640.00 229,810.00
4 1 m` Pengukuran dan pemasangan bouwplank 93,435.00 94,353.50
5 1 m2 Pembuatan kantor sementara, dengan lantai plesteran 1,886,414.00 1,953,990.00
6 1 m2 Pembuatan gudang semen dan alat-alat 1,404,175.00 1,432,925.00
7 1 m2 Pembuatan rumah jaga/konstruksi kayu 1,810,175.00 1,848,725.00
8 1 m2 Membersihkan lapangan dan perataan 7,900.00 7,900.00
9 1 m2 Pembuatan bedeng buruh 1,384,000.00 1,409,300.00
10 1 m2 Pembuatan bak adukan ukuran (40 x 50 x 20) cm 268,832.00 271,520.00
11 1 m2 Pembuatan Stegger dari bambu ukuran (40 x 50 x 20) cm 25,486.50 28,011.50
12 1 m2 Pembuatan jalan sementara/menuju bedeng 86,950.00 91,800.00
13 1 m3 Bongkaran beton bertulang 322,659.00 322,659.00
14 1 m3 Bongkaran dinding tembok bata merah 302,259.00 302,259.00
15 1 m’ Pasang pagar kawat jaring galvanis, tinggi 1,00 m 5,428.80 5,472.20

II. PEKERJAAN TANAH


1 1 m3 Galian tanah biasa sedalam 1 meter. 20,720.00 20,720.00
2 1 m3 Galian tanah biasa sedalam 2 meter. 27,206.00 27,206.00
3 1 m3 Galian tanah biasa sedalam 3 meter. 38,039.00 38,039.00
4 1 m3 Galian tanah keras sedalam 1 meter. 32,341.00 32,341.00
5 1 m3 Galian tanah cadas sedalam 1 meter. 64,750.00 64,750.00
6 1 m3 Galian tanah lumpur sedalam 1 meter. 42,679.00 42,679.00
7 1 m2 Pekerjaan stripping setinggi 1 meter. 2,590.00 2,590.00
8 1 m3 Pembuangan tanah sejauh 150 meter. 26,620.00 26,620.00
9 1 m3 Urugan kembali. 9,932.00 9,932.00
10 1 m3 Pemadatan Tanah. 25,900.00 25,900.00
11 1 m3 Urugan pasir. 79,700.00 106,940.00
12 1 m3 Lapisan pudel campuran 1 Kp : 3 Ps : 7 TL. 166,417.60 192,667.50
13 1 m3 Lapisan pudel campuran 1 Kp: 5 TL. 197,755.50 228,575.50
14 1 m3 Pemasangan lapisan ijuk. 13,770.00 14,370.00
15 1 m3 Urugan sirtu. 120,950.00 198,950.00
16 1 m3 Pekerjaan Urugan tanah dan pemadatan 71,930.00 71,930.00
17 1 m2 Pembuatan jalan proyek/sementara, tebal 25 cm. 102,680.00 108,840.00

III. PEKERJAAN PONDASI


1 1 m3 Pasang pondasi batu kali, 1 Pc : 1 Ps 881,930.00 923,550.00
2 1 m3 Pasang pondasi batu kali, 1 Pc : 2 Ps. 714,240.00 764,900.00
3 1 m3 Pasang pondasi batu kali, 1 Pc : 2,5 Ps. 646,440.00 698,300.00
4 1 m3 Pasang pondasi batu kali, 1 Pc : 3 Ps 626,950.00 682,250.00
5 1 m3 Pasang pondasi batu kali, 1 Pc : 4 Ps. 574,600.00 632,700.00

432229884.xlsx 12
HARGA BAWAH HARGA ATAS
NO. URAIAN
Rp. Rp.
1 2 3 4
6 1 m3 Pasang pondasi batu kali, 1 Pc : 5 Ps. 538,330.00 598,350.00
7 1 m3 Pasang pondasi batu kali, 1 Pc : 6 Ps. 512,820.00 574,200.00
8 1 m3 Pasang pondasi batu kali, 1 Pc : 8 Ps. 475,120.00 536,500.00
9 1 m3 Pasang pondasi batu kali, 1 Kp : 1 Sm : 1 Ps. 468,316.60 556,984.50
10 1 m3 Pasang pondasi batu kali, 1 Kp : 1 SM : 2 Ps. 411,068.00 476,035.00
11 1 m3 Pasang pondasi batu kali, 1 Pc : ¼ Kp : 4 Ps. 586,094.80 652,806.00
12 1 m3 Pasang pondasi batu kali, 1 Pc : 3 Kp : 10 Ps. 487,490.80 559,388.50
13 1 m3 Pasang pondasi batu kali, ¼ Pc : 1 Kp : 4 Ps. 455,228.40 527,860.50
14 1 m3 Pasang pondasi batu kosong 258,994.50 283,804.50
15 1 m3 Pasang pondasi siklop 40% batu kali 1,481,507.50 1,521,807.50
16 1 m3 Pasang pondasi sumuran diameter 100 Cm. 813,265.00 876,115.00
17 1 m' Pembuatan tiang pancang (40 X 40) Cm, beton bertulang 921,491.90 1,004,988.20
18 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang 643,533.60 656,891.80

IV. PEKERJAAN DINDING


1 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps 227,963.50 246,683.50
2 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps. 200,715.00 221,115.00
3 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps 186,737.50 208,017.50
4 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps 177,697.50 199,137.50
5 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps 172,470.00 194,630.00
6 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps 169,505.00 193,265.00
7 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps 165,757.00 190,157.25
8 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 1 Ps 107,465.00 116,705.00
9 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 2 Ps 95,832.50 105,872.50
10 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Ps 89,431.50 99,631.50
11 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 4 Ps 85,630.00 96,070.00
12 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 5 P 83,231.00 93,831.00
13 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 6 Ps 81,739.00 92,659.00
14 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 8 Ps 79,220.00 90,220.00
15 1 m2 Pasangan bata merah tebal ½ bata, 1 Pc : 3 Kp : 10 Ps 82,866.00 95,502.50
16 1 m2 Pasangan bata merah tebal ½ bata, 1 Kp : 1 Sm : 1 Ps 75,952.20 86,644.00
17 1 m2 Pasangan bata merah tebal ½ bata, 1 Kp : 1 Sm : 2 Ps 74,930.60 85,922.00
18 1 m2 Pasangan bataco 1 Pc : 3 Psr 79,322.50 83,662.50

V. PEKERJAAN PLESTERAN
1 1 m2 Plesteran 1 Pc : 1 Ps, tebal 15 mm. 39,536.50 40,576.50
2 1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm. 33,636.50 34,996.50
3 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm. 30,918.50 32,438.50
4 1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm. 29,182.50 30,782.50
5 1 m2 Plesteran 1 Pc : 5 Ps, tebal 15 mm. 28,146.50 29,906.50
6 1 m2 Plesteran 1 Pc : 6 Ps, tebal 15 mm. 27,338.50 29,178.50
7 1 m2 Plesteran 1 Pc : 8 Ps, tebal 15 mm. 26,298.50 28,218.50
8 1 m2 Plesteran 1 Pc : 0,5 Kp : 3 Ps, tebal 15 mm. 30,463.70 31,831.00
9 1 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm. 26,208.90 27,983.50
10 1 m2 Plesteran 0,5 Pc : 1 Kp : 4 Ps, tebal 15 mm. 28,054.50 30,120.00
11 1 m2 Plesteran 1 Kp : 1 Sm : 1 Ps, tebal 15 mm. 25,321.10 27,167.00
12 1 m2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm. 24,930.30 27,006.00
13 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm. 48,316.00 50,156.00
14 1 m2 Plesteran 1 Pc : 3 Ps, tebal 20 mm. 43,630.00 45,710.00
15 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm. 40,796.00 43,036.00

432229884.xlsx 13
HARGA BAWAH HARGA ATAS
NO. URAIAN
Rp. Rp.
1 2 3 4
16 1 m2 . Plesteran 1 Pc : 5 Ps, tebal 20 mm 38,780.50 41,020.50
17 1 m2 Plesteran 1 Pc : 6 Ps, tebal 20 mm. 37,498.00 39,898.00
18 1 m2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 20 mm. 32,008.60 34,574.50
19 1 m2 Plesteran 1 Pc : 2 Ps, tebal 25 mm. 51,169.00 52,209.00
20 1 m2 Plesteran 1 Pc : 3 Ps, tebal 25 mm. 48,371.50 51,171.50
21 1 m2 Plesteran 1 Pc : 4 Ps, tebal 25 mm. 45,440.00 48,480.00
22 1 m2 Plesteran 1 Pc : 5 Ps, tebal 25 mm. 43,327.00 46,447.00
23 1 m2 Plesteran 1 Pc : 2 Ps, tebal 30 mm. 59,725.00 62,525.00
24 1 m2 Plesteran 1 Pc : 3 Ps, tebal 30 mm. 56,555.00 59,675.00
25 1 m2 Plesteran 1 Pc : 4 Ps, tebal 30 mm. 52,898.50 56,258.50
26 1 m2 Plesteran 1 Pc : 5 Ps, tebal 30 mm. 48,633.00 52,233.00
27 1 m2 Berapen 1 Pc : 3 Ps, tebal 30 mm. 24,528.00 26,208.00
28 1 m2 Berapen 1 Pc : 5 Ps, tebal 15 mm. 22,738.00 24,578.00
29 1 m2 Plesteran Beton 1 Pc : 2 Ps, tebal 15 mm. 40,979.00 42,419.00
30 1 m2 Plesteran Beton 1 Pc : 3 Ps, tebal 15 mm. 38,105.50 39,785.50
31 1 m2 Plesteran Skoning 1 Pc : 2 Ps. 8,226.00 8,386.00
32 1 m2 Plesteran Ciprat. 1 Pc : 2 Ps 26,829.00 28,109.00
33 1 m2 Plesteran siar adukan 1 pc : 2 ps 19,940.50 21,220.50
34 1 m' Benangan / Tali Air / Sudut Kol kolan 1 pc : 3 ps 6,962.50 8,562.50

VI. PEKERJAAN KAYU


1 1 m3 Pasang kusen pintu dan jendela kayu jati eks Bojonegoro 27,065,490.00 27,315,410.00
2 1 m3 Pasang kusen pintu dan jendela kayu jati 22,685,400.00 23,565,400.00
3 1 m3 Pasang kusen pintu dan jendela kayu kamper. 13,690,400.00 13,990,400.00
4 1 m3 Pasang kusen pintu dan jendela kayu balau 12,970,400.00 13,210,400.00
5 1 m3 Pasang kusen pintu dan jendela kayu kempas 10,810,400.00 11,050,400.00
6 1 m3 Pasang kusen pintu dan jendela kayu kruing 10,810,400.00 11,050,400.00
7 1 m3 Pasang kusen pintu dan jendela kayu Meranti 7,930,400.00 8,170,400.00
8 1 m3 Pasang kusen pintu dan jendela kayu Akasia 6,490,400.00 6,550,400.00
9 1 m2 Pasang pintu klamp kayu kamper 469,911.50 477,111.50
10 1 m2 Pasang pintu klamp kayu balau 448,311.50 455,511.50
11 1 m2 Pasang pintu panel kayu jati eks Bojonegoro 1,444,139.00 1,462,323.00
12 1 m2 Pasang pintu panel kayu jati 999,775.00 1,025,959.00
13 1 m2 Pasang pintu panel kayu kanfer 635,775.00 643,775.00
14 1 m2 Pasang pintu panel kayu balau 611,775.00 619,775.00
15 1 m2 Pasang pintu panel kayu Kruing 539,775.00 547,775.00
16 1 m2 Pasang pintu panel kayu Kempas 539,775.00 547,775.00
17 1 m2 Pasang pintu panel kayu Meranti 443,775.00 451,775.00
18 1 m2 Pasang pintu panel kayu Akasia 387,775.00 389,595.00
19 1 m2 Pasang pintu dan jendela kaca kayu jati eks Bojonegoro 1,273,958.50 1,290,349.50
20 1 m2 Pasang pintu dan jendela kaca kayu jati 885,140.00 908,531.00
21 1 m2 Pasang pintu dan jendela kaca kayu kamper 566,640.00 574,120.00
22 1 m2 Pasang pintu dan jendela kaca kayu balau 545,640.00 553,120.00
23 1 m2 Pasang pintu dan jendela kaca kayu kempas 482,640.00 490,120.00
24 1 m2 Pasang pintu dan jendela kaca kayu kruing 482,640.00 490,120.00
25 1 m2 Pasang pintu dan jendela kaca kayu meranti 398,640.00 406,120.00
26 1 m2 Pasang pintu dan jendela kaca kayu Akasia 349,640.00 351,712.50
27 1 m2 Pasang pintu dan jendela jalusi kayu jati eks Bojonegoro 2,234,832.40 2,263,926.80
28 1 m2 Pasang pintu dan jendela jalusi kayu jati 1,523,850.00 1,565,744.40
29 1 m2 Pasang pintu dan jendela jalusi kayu kamper 955,050.00 967,850.00

432229884.xlsx 14
HARGA BAWAH HARGA ATAS
NO. URAIAN
Rp. Rp.
1 2 3 4
30 1 m2 Pasang pintu dan jendela jalusi kayu balau 916,650.00 929,450.00
31 1 m2 Pasang pintu dan jendela jalusi kayu kruing 801,450.00 814,250.00
32 1 m2 Pasang pintu dan jendela jalusi kayu kempas 801,450.00 814,250.00
33 1 m2 Pasang pintu dan jendela jalusi kayu meranti 647,850.00 660,650.00
34 1 m2 Pasang pintu dan jendela jalusi kayu Akasia 558,250.00 561,162.00
35 1 m2 Pasang jalusi mati kusen kayu jati eks Bojonegoro 2,008,646.00 2,035,922.00
36 1 m2 Pasang jalusi mati kusen kayu jati 1,342,100.00 1,381,376.00
37 1 m2 Pasang jalusi mati kusen kayu kanfer 796,100.00 808,100.00
38 1 m2 Pasang jalusi mati kusen kayu balau 760,100.00 772,100.00
39 1 m2 Pasang jalusi mati kusen kayu kempas 652,100.00 664,100.00
40 1 m2 Pasang jalusi mati kusen kayu kruing 652,100.00 664,100.00
41 1 m2 Pasang jalusi mati kusen kayu meranti 508,100.00 520,100.00
42 1 m2 Pasang jalusi mati kusen kayu Akasia 424,100.00 426,830.00
43 1 m2 Pasang pintu plywood rangkap, rangka kayu jati 610,800.00 626,530.16
44 1 m2 Pasang pintu plywood rangkap, rangka kayu kamper 432,440.00 439,260.00
45 1 m2 Pasang pintu plywood rangkap, rangka kayu balau 420,680.00 427,500.00
46 1 m2 Pasang pintu plywood rangkap, rangka kayu kempas 385,400.00 392,220.00
47 1 m2 Pasang pintu plywood rangkap, rangka kayu kruing 385,400.00 392,220.00
48 1 m2 Pasang pintu plywood rangkap, rangka kayu meranti 338,360.00 345,180.00
49 1 m2 Pasang pintu plywood rangkap, rangka kayu akasia 310,920.00 314,711.80
50 1 m2 Pasang pintu teakwood rangkap, rangka kayu jati 651,720.00 674,750.16
51 1 m2 Pasang pintu teakwood rangkap, rangka kayu kamper 473,360.00 487,480.00
52 1 m2 Pasang pintu teakwood rangkap, rangka kayu balau 461,600.00 475,720.00
53 1 m2 Pasang pintu teakwood rangkap, rangka kayu kempas 426,320.00 440,440.00
54 1 m2 Pasang pintu teakwood rangkap, rangka kayu kruing 426,320.00 440,440.00
55 1 m2 Pasang pintu teakwood rangkap, rangka kayu Akasia 351,840.00 362,931.80
56 1 m2 Pasang pintu plywood & formika, rangka kayu jati 785,925.00 802,405.16
57 1 m2 Pasang pintu plywood & formika rangka kayu kamper 607,565.00 615,135.00
58 1 m2 Pasang pintu plywood & formika rangka kayu balau 595,805.00 603,375.00
59 1 m2 Pasang pintu plywood & formika rangka kayu kempas 560,525.00 568,095.00
60 1 m2 Pasang pintu plywood & formika rangka kayu kruing 560,525.00 568,095.00
61 1 m2 Pasang pintu plywood & formika rangka kayu meranti 513,485.00 521,055.00
62 1 m2 Pasang pintu plywood & formika rangka kayu akasia 486,045.00 490,586.80
63 1 m2 Pasang pintu teakwood & formika rangka kayu jati ( divernis ) 789,425.00 809,855.16
64 1 m2 Pasang pintu teakwood & formika rangka kayu kamper ( divernis ) 611,065.00 622,585.00
65 1 m2 Pasang pintu teakwood & formika rangka kayu balau ( divernis ) 599,305.00 610,825.00
66 1 m2 Pasang pintu teakwood & formika rangka kayu kempas ( divernis ) 564,025.00 575,545.00
67 1 m2 Pasang pintu teakwood & formika rangka kayu kruing ( divernis ) 564,025.00 575,545.00
68 1 m2 Pasang pintu teakwood & formika rangka kayu meranti ( divernis ) 516,985.00 528,505.00
69 1 m2 Pasang pintu teakwood & formika rangka kayu akasia ( divernis ) 489,545.00 498,036.80
70 1 m2 Pasang pintu formika double, rangka kayu jati 966,730.00 991,160.16
71 1 m2 Pasang pintu formika double, rangka kayu kamper 788,370.00 803,890.00
72 1 m2 Pasang pintu formika double, rangka kayu balau 776,610.00 792,130.00
73 1 m2 Pasang pintu formika double, rangka kayu kempas 741,330.00 756,850.00
74 1 m2 Pasang pintu formika double, rangka kayu kruing 741,330.00 756,850.00
75 1 m2 Pasang pintu formika double, rangka kayu meranti 694,290.00 709,810.00
76 1 m2 Pasang pintu formika double, rangka kayu akasia 666,850.00 679,341.80
77 1 m3 Pasang konstruksi kuda-kuda kayu jati 22,337,400.00 23,230,900.00
78 1 m3 Pasang konstruksi kuda-kuda kayu kamper 12,437,400.00 12,725,900.00
79 1 m3 Pasang konstruksi kuda-kuda kayu balau 11,777,400.00 12,010,900.00

432229884.xlsx 15
HARGA BAWAH HARGA ATAS
NO. URAIAN
Rp. Rp.
1 2 3 4
80 1 m3 Pasang konstruksi kuda-kuda kayu kempas 9,797,400.00 10,030,900.00
81 1 m3 Pasang konstruksi kuda-kuda kayu kruing 9,797,400.00 10,030,900.00
82 1 m3 Pasang konstruksi kuda-kuda kayu Akasia 5,837,400.00 5,905,900.00
83 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu jati 21,989,160.00 22,882,660.00
84 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu kanfer 12,089,160.00 12,377,660.00
85 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Balau 11,429,160.00 11,662,660.00
86 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Kempas 9,449,160.00 9,682,660.00
87 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Kruing 9,449,160.00 9,682,660.00
88 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Meranti 6,809,160.00 7,042,660.00
89 1 m3 Pasang konstruksi Gording, balok tembok ( rangka atap ) Kayu Akasia 5,489,160.00 5,557,660.00
90 1 m2 Pasang kaso + reng genteng kodok kayu jati 244,015.00 253,615.00
91 1 m2 Pasang kaso + reng genteng kodok kayu kamper 136,015.00 139,015.00
92 1 m2 Pasang kaso + reng genteng kodok kayu balau 128,815.00 131,215.00
93 1 m2 Pasang kaso + reng genteng kodok kayu kempas 107,215.00 109,615.00
94 1 m2 Pasang kaso + reng genteng kodok kayu kruing 107,215.00 109,615.00
95 1 m2 Pasang kaso + reng genteng kodok kayu meranti 78,415.00 80,815.00
96 1 m2 Pasang kaso + reng genteng kodok kayu Akasia 64,015.00 64,615.00
97 1 m2 Pasang kaso + reng genteng MKP lokal kayu jati 244,015.00 253,615.00
98 1 m2 Pasang kaso + reng genteng MKP lokal kayu kamper 136,015.00 139,015.00
99 1 m2 Pasang kaso + reng genteng MKP lokal kayu balau 128,815.00 131,215.00
100 1 m2 Pasang kaso + reng genteng MKP lokal kayu kempas 107,215.00 109,615.00
101 1 m2 Pasang kaso + reng genteng MKP lokal kayu kruing 107,215.00 109,615.00
102 1 m2 Pasang kaso + reng genteng MKP lokal kayu meranti 78,415.00 80,815.00
103 1 m2 Pasang kaso + reng genteng MKP lokal kayu Akasia 64,015.00 64,615.00
104 1 m2 Pasang kaso + reng genteng monier kayu jati 282,415.00 293,615.00
105 1 m2 Pasang kaso + reng genteng monier kayu kamper 156,415.00 159,915.00
106 1 m2 Pasang kaso + reng genteng monier kayu balau 148,015.00 150,815.00
107 1 m2 Pasang kaso + reng genteng monier kayu kempas 122,815.00 125,615.00
108 1 m2 Pasang kaso + reng genteng monier kayu kruing 122,815.00 125,615.00
109 1 m2 Pasang kaso + reng genteng monier kayu meranti 89,215.00 92,015.00
110 1 m2 Pasang kaso + reng genteng monier kayu Akasia 72,415.00 73,115.00
111 1 m2 Pasang kaso + reng genteng beton kayu jati 282,415.00 293,615.00
112 1 m2 Pasang kaso + reng genteng beton kayu kanfer 156,415.00 159,915.00
113 1 m2 Pasang kaso + reng genteng beton kayu balau 148,015.00 150,815.00
114 1 m2 Pasang kaso + reng genteng beton kayu kempas 122,815.00 125,615.00
115 1 m2 Pasang kaso + reng genteng beton kayu kruing 122,815.00 125,615.00
116 1 m2 Pasang kaso + reng genteng beton kayu meranti 89,215.00 92,015.00
117 1 m2 Pasang kaso + reng genteng beton kayu Akasia 72,415.00 73,115.00
118 1 m2 Pasang kaso + reng atap sirap kayu jati 3,184,658.00 3,316,658.00
119 1 m2 Pasang kaso + reng atap sirap kayu kamper 1,699,658.00 1,740,908.00
120 1 m2 Pasang kaso + reng atap sirap kayu balau 1,600,658.00 1,633,658.00
121 1 m2 Pasang kaso + reng atap sirap kayu kempas 1,303,658.00 1,336,658.00
122 1 m2 Pasang kaso + reng atap sirap kayu kruing 1,303,658.00 1,336,658.00
123 1 m2 Pasang kaso + reng atap sirap kayu meranti 907,658.00 940,658.00
124 1 m2 Pasang kaso + reng atap sirap kayu Akasia 709,658.00 717,908.00
125 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu jati 259,787.50 269,387.50
126 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kamper 151,787.50 154,787.50
127 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu balau 144,587.50 146,987.50
128 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kempas 122,987.50 125,387.50
129 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu kruing 122,987.50 125,387.50

432229884.xlsx 16
HARGA BAWAH HARGA ATAS
NO. URAIAN
Rp. Rp.
1 2 3 4
130 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu meranti 94,187.50 96,587.50
131 1 m2 Pasang rangka langit-langit (1.00 x 1.00) m, kayu Akasia 79,787.50 80,387.50
132 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu jati 472,805.00 491,205.00
133 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kamper 265,805.00 271,555.00
134 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu balau 252,005.00 256,605.00
135 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kempas 210,605.00 215,205.00
136 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu kruing 210,605.00 215,205.00
137 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu meranti 155,405.00 160,005.00
138 1 m2 Pasang rangka langit-langit (30 x 60) cm, kayu Akasia 127,805.00 128,955.00
139 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu jati 556,012.50 577,612.50
140 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kamper 313,012.50 319,762.50
141 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu balau 296,812.50 302,212.50
142 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kempas 248,212.50 253,612.50
143 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu kruing 248,212.50 253,612.50
144 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu meranti 183,412.50 188,812.50
145 1 m2 Pasang rangka langit-langit (30 x 30) cm, kayu Akasia 151,012.50 152,362.50
146 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu jati. 161,262.50 165,975.62
147 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kamper 95,430.00 96,870.00
148 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu balau 91,422.50 92,862.50
149 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kempas 78,150.00 79,590.00
150 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu kruing 78,462.50 79,902.50
151 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu meranti 60,870.00 62,310.00
152 1 m’ Pasang lisplang ukuran (3 x 20) cm, kayu Akasia 50,790.00 51,117.60
153 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu jati 237,915.00 245,115.60
154 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kamper 137,815.00 140,015.00
155 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu balau 131,215.00 133,415.00
156 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kempas 111,415.00 113,615.00
157 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu kruing 111,415.00 113,615.00
158 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu meranti 85,015.00 87,215.00
159 1 m’ Pasang lisplang ukuran (3 x 30) cm, kayu Akasia 69,615.00 70,115.50
160 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu jati 315,847.50 325,339.20
161 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kamper 183,897.50 186,797.50
162 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu balau 175,197.50 178,097.50
163 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kempas 149,097.50 151,997.50
164 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu kruing 149,097.50 151,997.50
165 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu meranti 114,297.50 117,197.50
166 1 m’ Pasang lisplang ukuran 2 x( 3 x 20) cm, kayu Akasia 93,997.50 94,657.25
167 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu jati 185,515.00 191,144.56
168 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kanfer 107,255.00 108,975.00
169 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu balau 102,095.00 103,815.00
170 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kempas 86,615.00 88,335.00
171 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu kruing 86,615.00 88,335.00
172 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu meranti 65,975.00 67,695.00
173 1 m’ Pasang lisplang ukuran 2 x( 2 x 20) cm, kayu Akasia 53,935.00 54,326.30
174 1 m2 Pasang rangka dinding pemisah kayu jati 555,137.50 575,319.70
175 1 m2 Pasang rangka dinding pemisah kayu kanfer 315,937.50 322,212.50
176 1 m2 Pasang rangka dinding pemisah kayu balau 300,037.50 305,337.50
177 1 m2 Pasang rangka dinding pemisah kayu kempas 252,337.50 257,637.50
178 1 m2 Pasang rangka dinding pemisah kayu kruing 252,337.50 257,637.50
179 1 m2 Pasang rangka dinding pemisah kayu meranti 188,737.50 194,037.50

432229884.xlsx 17
HARGA BAWAH HARGA ATAS
NO. URAIAN
Rp. Rp.
1 2 3 4
180 1 m2 Pasang rangka dinding pemisah kayu tahun / akasia 155,537.50 156,831.00
181 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu jati 667,690.00 698,332.20
182 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kamper 391,890.00 401,325.00
183 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu balau 412,590.00 428,350.00
184 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kempas 364,890.00 380,650.00
185 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kruing 364,890.00 380,650.00
186 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu meranti 301,290.00 317,050.00
187 1 m2 Pasang dinding pemisah plywood rangkap, rangka Akasia 268,090.00 279,843.50
188 1 m2 Pasang dinding lambriziring dari papan jati 284,080.00 288,677.20
189 1 m2 Pasang dinding lambriziring dari papan kanfer 220,380.00 221,795.00
190 1 m2 Pasang dinding lambriziring dari papan balau 216,180.00 217,595.00
191 1 m2 Pasang dinding lambriziring dari papan kempas 203,580.00 204,995.00
192 1 m2 Pasang dinding lambriziring dari papan kruing 203,580.00 204,995.00
193 1 m2 Pasang dinding lambriziring dari papan meranti 186,780.00 188,195.00
194 1 m2 Pasang dinding lambriziring dari papan akasia 176,980.00 177,313.50
195 1 m2 Pasang plywood tebal 4 mm, untuk dinding 31,754.65 32,794.65
196 1 m’ Pasang list plafond -kayu profil 8,951.50 9,056.50

VII. PEKERJAAN BETON


1 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 5 Kr 674,227.50 741,927.50
2 1 m3 Membuat beton tumbuk 1 Pc : 3 Ps : 6 Kr 653,877.50 719,677.50
3 1 m3 Membuat beton tumbuk 1 Pc : 4 Ps : 6 Kr 614,977.50 686,677.50
4 1 m3 Membuat beton tumbuk 1 Pc : 2 Ps : 3 Kr. 673,827.50 738,827.50
5 1 m2 Membuat lantai kerja beton tumbuk 1 Pc : 3 Ps : 5 Kr, tebal 5 cm 81,173.00 84,573.00
6 1 m3 Membuat beton dengan mutu K 225 1,144,250.00 1,215,750.00
7 1 m3 Membuat beton dengan mutu K 275 1,170,750.00 1,227,350.00
8 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 4 Kr. 762,627.50 825,627.50
9 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 2,5 Kr. 834,227.50 900,027.50
10 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 3 Kr. 787,877.50 837,677.50
11 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 2,5 Kr. 891,127.50 952,127.50
12 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 2 Kr. 1,004,777.50 1,056,577.50
13 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr. 918,612.50 986,112.50
14 1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 4 split 872,562.50 938,062.50
15 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 3 split 967,662.50 1,029,262.50
16 1 m3 Membuat beton bertulang 1 Pc : 1,5 Ps : 2,5 split 1,001,912.50 1,064,312.50
17 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 1 Kr. 1,254,062.50 1,311,262.50
18 1 Kg Pembesian dengan besi polos atau besi ulir 12,577.65 12,577.65
19 1 m2 Pasang bekisting untuk pondasi 135,665.00 139,715.00
20 1 m2 Pasang bekisting untuk sloof 148,165.00 152,715.00
21 1 m2 Pasang bekisting untuk kolom 257,945.50 273,895.50
22 1 m2 Pasang bekisting untuk balok 266,345.50 282,595.50
23 1 m2 Pasang bekisting untuk lantai 322,845.50 358,795.50
24 1 m2 Pasang bekisting untuk tangga 233,620.50 248,545.50
25 1 m2 Pasang jembatan cor 96,513.50 100,623.50
26 1 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting). 3,265,182.50 3,350,382.50
27 1 m3 Membuat sloof beton bertulang (200 kg besi + bekisting). 4,109,872.50 4,202,172.50
28 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting). 7,025,700.00 7,250,200.00
29 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting). 5,365,756.50 5,560,356.50
30 1 m3 Membuat balok beton bertulang (150 kg besi + bekisting). 4,978,380.00 5,250,980.00
31 1 m3 Membuat dinding beton bertulang (150 kg besi + bekisting). 4,731,474.00 4,960,074.00

432229884.xlsx 18
HARGA BAWAH HARGA ATAS
NO. URAIAN
Rp. Rp.
1 2 3 4
32 1 m3 Membuat tangga beton bertulang (200 kg besi + bekisting). 4,978,173.50 5,151,773.50
33 1 m’ Membuat kolom penguat beton bertulang (11 x 11) cm. 60,859.00 61,809.00
34 1 m’ Membuat ring balok beton bertulang (10 x 15) cm. 71,902.50 73,372.50
35 1 m2 Membuat Bekisting 147,715.00 152,215.00
36 1 m3 Membongkar bekisting dan perawatan beton 180,000.00 180,000.00

VIII. PEKERJAAN PENUTUP ATAP


1 1 m2 Pasang atap genteng press biasa 44,606.50 47,106.50
2 1 m2 Pasang atap genteng MKP lokal 49,606.50 52,106.50
3 1 m2 Pasang atap genteng Mantili 47,306.50 49,506.50
4 1 m’ Pasang bubung genteng MKP Lokal 67,326.00 71,386.00
5 1 m2 Pasang atap asbes gelombang besar (3,00 x 1,05 m) x 4 mm 38,658.50 39,128.50
6 1 m2 Pasang atap asbes gelombang kecil (1,80 x 1,05 m) x 4 mm 36,194.00 36,926.00
7 1 m’ Pasang bubung stel gelombang besar 41,782.00 42,342.00
8 1 m’ Pasang bubung stel gelombang kecil 32,322.00 32,992.00
9 1 m2 Pasang atap genteng beton 57,235.00 58,335.00
10 1 m2 Pasang atap genteng metal 135,943.00 141,043.00
11 1 m2 Pasang atap sirap 142,151.50 147,151.50
12 1 m’ Pasang nok genteng beton 77,510.00 80,420.00
13 1 m’ Pasang nok sirap 63,730.50 64,930.50
14 1 m2 Pasang atap seng gelombang 56,433.00 57,153.00
15 1 m2 Pasang atap nok seng 25,256.50 25,596.50
16 1 m2 Pasang aluminium foil / sisalation 20,876.50 20,981.50

IX. PEKERJAAN LANGIT - LANGIT


1 1 m2 Langit-langit asbes (1,00 x 1,00) m, tebal 4 mm 16,634.50 16,744.50
2 1 m2 Langit-langit plywood (30 x 60) cm, tebal 4 mm 32,707.00 33,643.00
3 1 m2 Langit-langit teakwood (30 x 60) cm, tebal 4 mm 45,883.00 49,447.00
4 1 m2 Langit-langit gypsum board, tebal 9 mm 35,563.50 36,037.50
5 1 m' List Plafond Gypsum Kecil 21,530.50 22,155.50
6 1 m' List Plafond Gypsum Besar 32,030.50 32,655.50

X. PEKERJAAN SANITASI
1 1 bh Memasang kloset duduk/monoblok 1,240,292.50 1,256,192.50
2 1 bh Memasang kloset duduk keramik 572,492.50 593,692.50
3 1 bh Memasang kloset jongkok porselen 347,780.00 351,580.00
4 1 bh Memasang kloset jongkok teraso 244,180.00 248,080.00
5 1 bh Memasang urinoir 482,950.00 490,250.00
6 1 bh Memasang wastafel 415,450.00 421,850.00
7 1 bh Memasang bak mandi teraso volume 0,30 m3 324,380.00 330,180.00
8 1 bh Memasang bak mandi Fibreglass volume 0,30 m3 354,180.00 360,080.00
9 1 bh Memasang badkip porselen 1,535,377.15 1,565,377.15
10 1 bh Memasang bak fibreglass volume 1 m3 air 746,400.00 757,600.00
11 1 m' Memasang pipa beton, diameter 15 cm - 20cm 80,002.90 96,567.70
12 1 m' Memasang pipa beton, diameter 30 cm 127,526.90 146,723.20
13 1 m' Memasang pipa beton, diameter 40 cm 135,776.90 154,973.20
14 1 m' Memasang pipa beton, diameter 50 cm 166,026.90 182,473.20
15 1 m' Memasang pipa beton, diameter 60 cm 171,526.90 193,473.20
16 1 m' Memasang pipa beton, diameter 80 cm 204,526.90 220,973.20
17 1 m' Memasang pipa beton, diameter 100 cm 294,726.90 319,533.20

432229884.xlsx 19
HARGA BAWAH HARGA ATAS
NO. URAIAN
Rp. Rp.
1 2 3 4
18 1 bh Memasang bak kontrol pasangan batu bata ukuran (30 x30) cm, tinggi 35 cm 346,644.25 364,144.25
19 1 bh Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm 321,113.00 347,813.00
20 1 bh Memasang bak kontrol pasangan batu bata ukuran (60x60) cm, tinggi 65 cm 478,914.00 514,224.00
21 1 m' Memasang buis beton 1/2 lingkaran dia 20 cm 35,926.45 40,788.85
22 1 m' Memasang buis beton 1/2 lingkaran dia 30 cm 47,476.45 58,388.85
23 1 m' Memasang buis beton 1/2 lingkaran dia 40 cm 49,676.45 58,388.85
24 1 m' Memasang pipa galvanis diameter 1” tebal 0,8 mm 28,603.50 30,928.50
25 1 m' Memasang pipa galvanis diameter 1,5” tebal 0,8 mm 33,253.50 33,253.50
26 1 m' Memasang pipa galvanis diameter 2” tebal 0,8 mm 40,228.50 44,103.50
27 1 m' Memasang pipa galvanis diameter 2,5” tebal 0,8 mm 60,877.20 65,527.20
28 1 m' Memasang pipa galvanis diameter 3” tebal 0,8 mm 94,202.20 94,202.20
29 1 m' Memasang pipa galvanis diameter 4” tebal 0,8 mm 109,702.20 119,002.20
30 1 m' Memasang pipa GIP BSA diameter ½” 16,203.50 19,303.50
31 1 m' Memasang pipa GIP BSA diameter ¾” 19,303.50 23,953.50
32 1 m' Memasang pipa GIP BSA diameter 1” 22,403.50 28,603.50
33 1 m' Memasang pipa GIP BSA diameter 1½” 32,977.20 41,114.70
34 1 m' Memasang pipa GIP BSA diameter 2” 36,077.20 45,764.70
35 1 m' Memasang pipa GIP BSA diameter 3” 43,827.20 57,389.70
36 1 m' Memasang pipa GIP BSA diameter 4” 53,431.15 69,706.15
37 1 m' Memasang pipa PVC tipe AW diameter ½” 13,472.40 13,782.40
38 1 m' Memasang pipa PVC tipe AW diameter ¾” 15,332.40 15,642.40
39 1 m' Memasang pipa PVC tipe AW diameter 1” 16,804.90 17,812.40
40 1 m' Memasang pipa PVC tipe AW diameter 5” 145,997.40 149,717.40
41 1 m' Memasang pipa PVC tipe AW diameter 2” 35,476.10 38,111.10
42 1 m' Memasang pipa PVC tipe AW diameter 2½ ” 48,967.40 53,307.40
43 1 m' Memasang pipa PVC tipe AW diameter 3 ” 68,330.05 68,330.05
44 1 m' Memasang pipa PVC tipe AW diameter 4 ” 93,905.05 93,905.05
45 1 bh Memasang kran Dupon diameter ½” 165,742.50 174,117.50
46 1 bh Memasang kran Toto diameter ½” 248,742.50 258,117.50
47 1 bh Memasang kran diameter ½” 22,142.50 31,917.50
48 1 bh Memasang kran diameter ¾” 27,542.50 40,817.50
49 1 bh Memasang stop kran diameter ½” 36,142.50 39,617.50
50 1 bh Memasang stop kran diameter ¾” 40,442.50 44,117.50
51 1 bh Memasang stop kran diameter 1” 45,942.50 50,117.50
52 1 bh Memasang Floor drain stainless steel 22,165.00 22,965.00
53 1 bh Memasang Floor drain plastik 16,165.00 16,565.00

XI. PEKERJAAN BESI DAN ALUMINIUM


1 1 Kg Pabrikasi dan pasang Rangka baja 20,340.40 20,340.40
2 1 Kg Pasang rangka atap baja 18,940.40 18,940.40
3 1 m2 Pasang pintu besi baja 1,082,447.50 1,092,447.50
4 1 m2 Pasang pintu lipat 1,104,541.10 1,114,541.10
5 1 m2 Pasang Rolling door 540,416.10 565,416.10
6 1 m2 Pasang pintu alluminium 774,541.10 784,541.10
7 1 m2 Pasang kawat harmonika 63,489.00 64,949.00
8 1 m2 Pasang kawat nyamuk 38,409.00 38,879.00
9 1 m2 Pasang jendela nako & tralis 293,330.00 304,957.00
10 1 m` Pasang talang datar, seng bjls 30 112,527.50 114,947.50
11 1 m` Pasang talang miring, seng bjls 30 163,787.50 168,087.50
12 1 m’ Pasang talang ½ lingkaran D-10 cm, seng bjls 30 153,522.50 157,622.50

432229884.xlsx 20
HARGA BAWAH HARGA ATAS
NO. URAIAN
Rp. Rp.
1 2 3 4
13 1 m’ Pasang talang ½ lingkaran D-10 cm, seng bjls 20 144,462.50 148,322.50

XII. PEKERJAAN KUNCI DAN KACA


1 1 bh Pasang kunci tanam biasa 90,165.00 95,165.00
2 1 bh Pasang kunci tanam SES ( pelor ) 186,354.00 193,654.00
3 1 bh Pasang kunci tanam SES 251,154.00 261,654.00
4 1 bh Pasang selot rossete dekson 370,154.00 386,554.00
5 1 bh Pasang engsel jendela biasa 16,888.50 16,988.50
6 1 bh Pasang engsel pintu biasa 17,988.50 18,088.50
7 1 bh Pasang engsel stainllesstel dekson 3" 58,288.50 60,688.50
8 1 bh Pasang engsel stainllesstel dekson 4" 106,288.50 111,088.50
9 1 bh Pasang engsel stainllesstel dekson 5" 117,288.50 122,588.50
10 1 bh Pasang grendel pintu panjang 22,388.50 22,488.50
11 1 bh Pasang grendel jendela SES 31,288.50 32,288.50
12 1 bh Pasang grendel tanam SES 63,088.50 65,688.50
13 1 bh Pasang grendel pintu ganda dekson 40 cm 128,288.50 134,188.50
14 1 bh Pasang hak angin 20,188.50 20,288.50
15 1 bh Pasang hak angin SES 40,288.50 41,788.50
16 1 bh Pasang handel pintu stainlesstel kecil 49,295.00 50,095.00
17 1 bh Pasang handel pintu stainlesstel besar 124,295.00 128,795.00
18 1 bh Pasang handel pintu ganda dekson 30 cm 587,295.00 614,995.00
19 1 bh Pasang handel pintu ganda dekson 40 cm 624,295.00 653,795.00
20 1 bh Pasang rel pintu dorong 286,154.00 310,654.00
21 1 m2 Pasang kaca , tebal 3 mm 68,368.50 68,588.50
22 1 m2 Pasang kaca , tebal 5 mm 69,688.50 70,788.50
23 1 m2 Pasang kaca Ry band , tebal 5 mm 97,408.50 98,288.50
24 1 m2 Pasang kaca patri , tebal 5 mm 2,510,368.50 3,010,318.50
25 1 m2 Pasang kaca air tbl. 5 mm 104,668.50 104,888.50

XIII. PEKRJAAN PENUTUP LANTAI


1 1 m2 Pasang lantai ubin pc abu-abu ukuran 20x20 cm 67,205.50 70,935.50
2 1 m2 Pasang lantai keramik ukuran 20x20 cm 124,371.60 127,702.00
3 1 m2 Pasang lantai keramik tekstur ukuran 20x20 cm 126,686.00 132,962.00
4 1 m2 Pasang lantai keramik tekstur ukuran 30x30 cm 132,998.00 139,274.00
5 1 m2 Pasang lantai Granit ( ex Granito ) warna terang ukuran 40x40 cm 209,794.00 220,278.00
6 1 m2 Pasang lantai Granit ( ex Granito ) warna gelap ukuran 40x40 cm 222,418.00 232,902.00
7 1 m2 Pasang lantai Granit ( ex Granito ) tektur ukuran 40x40 cm 292,902.00 307,594.00
8 1 m2 Pasang lantai Granit ( ex Granito ) tektur ukuran 60x60 cm 382,322.00 401,222.00
9 1 m2 Pasang lantai Granit ( ex Granito ) warna terang ukuran 60x60 cm 299,214.00 313,906.00
10 1 m2 Pasang lantai Granit ( ex Granito ) warna gelap ukuran 60x60 cm 324,462.00 340,206.00
11 1 m2 Pasang lantai batu lempeng 168,240.00 177,146.00
12 1 m2 Pasang lantai marmer bakar 185,598.00 189,770.00
13 1 m2 Pasang lantai Keramik putih ukuran 40x40 cm 119,322.00 124,546.00
14 1 m2 Pasang lantai Keramik warna ukuran 40x40 cm 127,738.00 134,014.00
15 1 m2 Pasang lantai Keramik putih ukuran 30x30 cm 113,010.00 118,234.00
16 1 m2 Pasang lantai Keramik warna ukuran 30x30 cm 121,426.00 126,650.00
17 1 m2 Pasang lantai marmer 262,394.00 268,670.00
18 1 m2 Pasang lantai granit motif 255,030.00 263,410.00
19 1 m2 Pasang lantai batu candi hitam 192,962.00 200,290.00
20 1 m2 Pasang lantai andesit 30 x 30 cm 241,354.00 247,630.00

432229884.xlsx 21
HARGA BAWAH HARGA ATAS
NO. URAIAN
Rp. Rp.
1 2 3 4
21 1 m2 Pasang Paving Stone / conblok Warna Tebal 6 Cm K225 76,050.00 82,150.00
22 1 m2 Pasang Paving Stone / conblok Abu-abu Tebal 6 Cm K225 68,350.00 76,320.00
23 1 m2 Pasang Paving Stone / conblok Warna Tebal 8 Cm K225 81,550.00 87,650.00
24 1 m2 Pasang Paving Stone / conblok Abu-abu Tebal 8 Cm K225 74,730.00 80,830.00
25 1 m2 Pasang Paving Stone / Conblok 5 Warna Uk 10 x 10 cm 88,150.00 96,450.00
26 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm K 300 71,650.00 79,950.00
27 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm K 400 74,950.00 83,580.00
28 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 6 cm 54,050.00 60,150.00
29 1 m2 Pasang Paving Stone / Conblok Abu abu tebal 8 cm 56,250.00 62,350.00
30 1 m2 Pasang dinding keramik putih Uk. 20x25 cm 122,832.50 127,452.50
31 1 m2 Pasang dinding keramik motif Uk. 20x25 cm 123,892.50 128,512.50
32 1 m2 Pasang dinding keramik Uk. 20x33 cm 139,792.50 144,412.50
33 1 m2 Pasang dinding keramik cutting Uk. 30x50 cm 181,132.50 187,872.50
34 1 m2 Pasang dinding keramik Cutting Uk. 31x63 cm 252,152.50 263,132.50
35 1 m2 Pasang dinding keramik tekstur Cutting Uk. 31x63 cm 271,232.50 283,272.50
36 1 m2 Pasang dinding batu lempeng 160,115.00 168,690.00
37 1 m2 Pasang dinding batu andesit alur 274,565.00 281,040.00
38 1 m2 Pasang dinding batu andesit 30 x 30 cm 233,090.00 239,040.00
39 1 m2 Pasang dinding batu candi hitam 184,790.00 191,790.00
40 1 m2 Pasang dinding batu susun sirih 316,040.00 328,290.00
41 1 m2 Pasang dinding batu salagedang 170,615.00 176,040.00
42 1 m2 Pasang dinding batu paras grobongan 160,115.00 165,540.00
43 1 m2 Pasang dinding batu granit motif 246,740.00 254,790.00
44 1 m2 Pasang dinding batu marmo biasa 142,265.00 162,285.00
45 1 m2 Pasang dinding batu marmo warna 167,990.00 207,540.00
46 1 m2 Pasang dinding batu bobos 177,440.00 181,290.00
47 1 m2 Pasang dinding batu warna ( hias ) 157,490.00 162,915.00
48 1 m' Plint kayu 2 x 10 cm 61,008.00 62,584.04
49 1 m2 Lantai Patlag 1 Lapis Bata merah camp. 1 Sm : 1 Kpr : 3 Psr 42,759.80 50,141.00
50 1 m' Plint keramik uk 10 x 20 cm 97,070.00 97,326.00

XIV PEKERJAAN PENGECATAN


1 1 m2 Mengikis/mengerok permukaan cat tembok lama 8,570.00 8,620.00
2 1 m2 Pengecatan bidang kayu lama 27,441.25 27,501.25
3 1 m2 Pengecatan bidang kayu baru (1 lps plamir),1 lps cat dasar, 2 lps cat penutup. 31,112.50 31,272.50
4 1 m2 Pengecatan bidang kayu baru (1 lps plamir), 1 lps cat dasar, 3 lpis cat penutup. 41,007.50 41,167.50
5 1 m2 Pelaburan bidang kayu dengan teak oil 12,050.00 12,302.00
6 1 m2 Pelaburan bidang kayu dengan politur 31,344.00 33,066.00
7 1 m2 Pelaburan bidang kayu dengan cat residu dan ter 6,833.00 6,833.00
8 1 m2 Pelaburan bidang kayu dengan vernis 23,620.00 24,189.00
9 1 m2 Pengecatan tembok baru (1 lapis plamir,1 lapis cat dasar, 2 lapis cat penutup) 13,216.25 13,986.25
10 1 m2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) 10,107.50 10,707.50
11 1 m2 Pegecatan permukaan baja dengan meni besi 15,940.00 15,949.00
12 1 m2 Pegecatan permukaan baja dengan meni besi dan perancah 32,713.75 32,922.75
13 1 m2 Pengecatan Plafond lama (1 lapis cat dasar, 2 lapis cat penutup) 12,634.38 13,384.38
14 1 m2 Pengecatan Plafond baru (1 lapis plamir,1 lapis cat dasar, 2 lapis cat penutup) 16,520.31 17,482.81
15 1 m2 Couttting ( Glasur batu alam ) 30,186.50 30,696.50
16 1 m2 Pengecatan genteng ( 1 lapis cat dasar, 2 lapis cat penutup) 20,307.50 21,207.50
17 1 m2 Pengecatan tembok interior premium 27,256.25 28,386.25
18 1 m2 Pengecatan tembok eksterior weathershield 34,096.25 35,586.25

432229884.xlsx 22
HARGA BAWAH HARGA ATAS
NO. URAIAN
Rp. Rp.
1 2 3 4
19 1 m2 Pengecatan Permukaan Baja lapis seng secara manual sistem 1 lapis dengan tebal 200 um 17,478.00 17,478.00
20 1 m2 Pengecatan Permukaan Baja lapis seng secara semprot sistem 1 lapis dengan tebal 200 um 96,950.00 96,950.00

Keterangan :
Harga tersebut tidak termasuk PPn.

432229884.xlsx 23
SI HARGA SATUAN ANALISA
IA BANGUNAN GEDUNG DAN PERUMAHAN
UKSI ( ABK ) TAHUN 2013 TRIWULAN 1

KET.
5

432229884.xlsx 24
KET.
5

432229884.xlsx 25
KET.
5

432229884.xlsx 26
KET.
5

432229884.xlsx 27
KET.
5

432229884.xlsx 28
KET.
5

432229884.xlsx 29
KET.
5

432229884.xlsx 30
KET.
5

432229884.xlsx 31
KET.
5

432229884.xlsx 32
KET.
5

432229884.xlsx 33
KET.
5

432229884.xlsx 34
KET.
5

432229884.xlsx 35

Anda mungkin juga menyukai