DAFTAR HARGA SATUAN BAHAN DAN UPAH

NO URAIAN SATUAN UD. Wahyu Indah UD. Sinar Alam HARGA SATUAN
1 2 3 4

A BAHAN PASANGAN
1 Batu Pecah Besar m3
2 Batu Pecah 5 - 7 cm m3
3 Batu Pecah 2 - 3 cm m3
4 Batu Pecah 3 - 4 / 3-5 cm m3
5 Batu Pecah 1 - 2 cm m3
6 Batu Pecah 10-15 cm m3
7 Batu Pecah 0,5 - 1 cm m3
8 Batu Seplit Halus ( 0,5 - 1 ) cm m3
9 Batu Seplit Jagung (1 - 2) cm/ kasar m3
10 Pasir Batu (Sirtu) m3
11 Batu 5-7 cm m3
12 Batu 2-3 cm m3
13 Batu 3-5 cm m3
14 Batu 0,5-1 cm m3
15 Batu 1-2 cm m3
16 Batu Kali m3

B KERIKIL (KORAL)
1 Kerikil Biasa/ timbun m3
2 Kerikil Beton m3
3 Kerikil Halus m3
4 Kerikil Sungai (tidak disaring) m3

C PASIR
1 Pasir Urug m3
2 Pasir Beton m3
3 Pasir Pasang m3

D TANAH
1 Tanah Urug m3

E BATU BATA
1 Bata Gosok klas I bj
2 Bata Gosok klas II bj
3 Bata Press Tulikup bj
4 Bata Pasang klas I bj
5 Bata Pasang klas II bj
6 Batu Pipih Singaraja m3
7 Loster Terawang PC bj
8 Roster Terawang Keramik 30 x 30 bj

F PORTLAND CEMENT
1 Semen Gresik ( 40 kg ) zak
2 Semen Tiga Roda (50 kg) zak
3 Semen Bosowa (50 kg) zak
4 Semen Warna kg

G BAHAN ATAP
1 Genteng Kodok Sejati bj
2 Bubungan Genteng Kodok Sejati bj
3 Genteng Goodyear bj
4 Bubungan Goodyear bj
5 Genteng Kaca 3 mm bj
6 Zincalume / spandeck 0,25 mm m2
7 Zincalume 0,25 mm/Trimdeck m2
8 Reng Zincalume (6m) btg
9 UK-75-75 M'
10 UK-75-55 M'
11 UK-65-55 M'
12 C-75-55 M'
13 Reng AA 0,45 Btg
14 Skrup SDS 8 x 16 Bh
15 Skrup SDS 12 x 20 Bh
16 Skrup SDS 10 x 16 Bh
17 Dynabol 10 x 65 Bh
18 Diafrakma (PLD) Bh
19 Sepatu UK (PK) Bh
20 Dynabolt bh
21 Lisplank Fiber Cement btg

H SENG
1 Gelombang BJLS 0,18 mm lbr
2 Gelombang BJLS 0,20 mm lbr
3 Seng Talang 30 cm m
NO URAIAN SATUAN UD. Wahyu Indah UD. Sinar Alam HARGA SATUAN
1 2 3 4

I BAHAN KAYU
1 Kayu Jati Papan m3
2 Kayu Jati Balok m3
3 Kayu Jati Bali Papan m3
4 Kayu Jati Bali Balok m3
5 Kayu Kamper Papan 3/20 m3
6 Kayu Kamper Balok 8/12 m3
7 Kayu Kamper Balok 6/12 m3
8 Kayu Kamper Usuk 4/6 m3
9 Kayu Kamper Usuk 5/7 m3
10 Kayu Kamper Reng m3
11 Kayu Meranti Papan m3
12 Kayu Meranti Balok 8/12 m3
13 Kayu Meranti Balok 6/12 m3
14 Kayu Meranti Usuk 5/7 m3
15 Kayu Meranti Usuk 4/6 m3
16 Kayu Meranti Reng m3
17 Kayu Kruing Papan m3
18 Kayu Kruing Balok 8/12 m3
19 Kayu Kruing Balok 6/12 m3
20 Kayu Kruing Usuk 5/7 m3
21 Kayu Kruing Usuk 4/6 m3
22 Reng Kruing ikat
23 Seseh Balok m3
24 Papan begesting Lbr
25 Balok bingkirai m3
26 Papan bingkirai m3
27 Plywood 4 mm lbr
28 Plywood 9 mm lbr
29 Seseh Dolken mtr
30 Multipleks
31 - 6 mm lbr
32 - 9 mm lbr
33 - 12 mm lbr
34 - 18 mm lbr
35 Dolken kayu 8-10/4m btg
36 List Kayu 2/4 - 4 m btg
37 Kayu profil btg
38 Kayu Perancah m3

J BAHAN BAMBU
1 Bambu Besar btg
2 Bambu Sedang btg
3 Bambu Kecil btg
4 Gedeg Kelas I m2
5 Gedeg Kelas II m2

K BETON CETAK
1 Buis Beton 50/1 m` bj
2 Buis Beton 30/1 m` bj
3 Buis Beton 25/1 m` bj
4 Buis Beton 20/1 m` bj
5 Buis Beton 50/0,75 m` bj
6 Buis Beton 30/0,75 m` bj
7 Buis Beton 25/0,75 m` bj
8 Buis Beton 20/0,75 m` bj
9 Buis Beton dia 1 m, H = 0,5 m, t = 0,05 m bj
10 Batako Cetak Buntu KW I bj
11 Paving Blok / 6 cm m2
12 Paving Blok / 8 cm m2

L KERAMIK
1 Keramik KW I 25/40 cm m2
2 Keramik KW I 20/20 cm m2
3 Keramik KW I 30/30 cm putih polos m2
4 Keramik KW I 40/40 cm putih polos m2
5 Ubin Pemandu m2

M BAHAN BESI
1 Besi Beton Polos
- besi Ø 4 mm ljr / btg
- besi Ø 6 mm ljr / btg
- besi Ø 8 mm ljr / btg
- besi Ø 10 mm ljr / btg
- besi Ø 12 mm ljr / btg
- besi Ø 16 mm ljr / btg
- besi Ø 18 mm ljr / btg
- besi Ø 22 mm ljr / btg
- besi Ø 24 mm ljr / btg
NO URAIAN SATUAN UD. Wahyu Indah UD. Sinar Alam HARGA SATUAN
1 2 3 4

2 Besi Beton ulir


- besi D 13 mm ljr
- besi D 16 mm ljr
- besi D 19 mm ljr

N KAWAT
1 Kawat Ikat Beton kg
2 Kawat nyamuk 1 x 2 m m2
3 Kawat Harmonika 5 x 5 cm m2
4 Kawat Harmonika 4 x 4 cm m2
5 Kawat Harmonika 3 x 3 cm m2
6 Kawat 4 mm kg
7 Besi Strip kg
8 Besi Profil WF kg

O BAHAN PLAFON
1 Triplek 3 mm lbr
2 Teak Wood 4 mm lbr
3 Teak Wood 3 mm lbr
4 Aluminium Foil (Pj=60, l=100) glg
5 Kalsiboard lbr
6 Gypsum lbr
7 List Gypsum m'
8 Rangka metal hollow 40.40.4 mm m'

P BAHAN PIPA
1 Pipa PVC AW
- ø 4" btg
- ø 3" btg
- ø 2,5" btg
- ø 2" btg
- ø 1,5" btg
- ø 1" btg
- ø 0,75" btg
- ø 0,5" btg
2 Pipa PVC C
- ø 4" btg
3 Pipa PVC D
- ø 4" btg
- ø 3" btg
- ø 2,5" btg
- ø 2" btg
- ø 1,5" btg
- ø 1" btg
- ø 0,75" btg
- ø 0,5" btg
4 Pipa listrik btg
5 Pipa Paralon 5/8 " btg

Q BAHAN FINISHING
1 Amplas lbr
2 Minyak Cat ltr
3 Meni kayu kg
4 Plamir kayu kg
5 Cat Dasar Kayu kg
6 Cat Kayu kg
7 Plamir Tembok kg
8 Cat Dasar Tembok kg
9 Cat Tembok Interior kg
10 Cat Tembok Eksterior kg
11 Meni Besi kg
12 Dempul kg
13 Cat Besi kg
14 Politur ltr
15 Politur jadi ltr
16 Teak Oil ltr
17 Spritus ltr
18 Lem Kayu kg
19 Impra kg
20 Kuas bh

R BAHAN KACA
1 Kaca Bening 3 mm m2
2 Kaca Bening 5 mm m2
3 Kaca Bening 6 mm m2
4 Kaca Bening 8 mm m2

S ALAT PENGUNCI
1 Kunci Handle Komplit bh
2 Kunci Double Handle Komplit bh
NO URAIAN SATUAN UD. Wahyu Indah UD. Sinar Alam HARGA SATUAN
1 2 3 4

3 Kunci Sleding Handle Komplit bh


4 Kunci KM/ WC bh
5 Kunci Gembok bh
6 Grendel Pintu bh
7 Grendel Jendela bh
8 Rel Pintu Sleding bh
9 Espagnolet bh

T ALAT PENGGANTUNG
1 Kait Angin psg
2 Engsel Pintu psg
3 Engsel Jendela psg
4 Espanolet bh

U BAHAN SANITAIR
1 Washtafel bh
2 Urinoir bh
3 Closet Jongkok bh
4 Closet Duduk bh
5 Bak Mandi Fiber bh
6 Bak Mandi Keramik bh
7 Floordrain bh
8 Jet Shower bh
9 Kran Air bh

V BAHAN PAKU
1 Paku Lis kg
2 Paku Reng kg
3 Paku Usuk kg
4 Paku Seng kg
5 Paku Sekrup 1/2" ktk
6 Paku Sekrup 2" ktk
7 Paku gypsum kg
8 Paku beton 5 cm kg
9 Paku beton 3" ktk
10 Paku pancing ktk
11 Skrup fixer bh
12 Sealant bh
13 Accessories Kusen Aluminuim ls
14 Accessories Pintu Aluminuim ls

W BAHAN LISTRIK
1 NYY 3 x 2.5 mm2 M'
2 NYM 3 x 2.5 mm2 M'
3 Conduit high impact M'
4 Socket Bh
5 Cleam + Fisher ulir Bh
6 Saklar Tungal bh
7 Saklar Ganda bh
8 Stop Kontak bh
9 Bok MK bh
10 Fitting Lampu broco bh
11 Pas. Lampu LED 18 watt philips Bh
12 Pas. Lampu LED 14 watt philips Bh

X LAIN-LAIN
1 Papan Informasi K3 ukuran 3m x 1m unit
2 Pelindung pernafasan (Masker) bh
3 Topi pelindung (Safety Helmet) bh
4 Rompi keselamatan (Safety Vest) bh
5 Kotak P3K bh
6 Rambu Peringatan bh
7 Pita pengaman/pembatas area pekerjaan bh
8 Loster 25 x 25 cm bh
9 Solar ltr
10 Oli Bh
11 Sikat Ijuk buah
12 Aluminium 4" m'
13 Aluminium (bahan jendela) m'
14 Daun Pintu SWP m2
15 Aluminium Slet m'
16 Ikut Celedu Paras bh
17 Murda Paras bh
18 Pipa Galvanis 2 x 4 cm m
19 Pipa Galvanis 4 x 6 cm m
20 Pipa Stainless Ø 2" m
21 Dynabolt 10 mm m
22 Accssesories m
23 Kawat Las btg
24 Jaring Kawat m2
NO URAIAN SATUAN UD. Wahyu Indah UD. Sinar Alam HARGA SATUAN
1 2 3 4

25 Pintu Harmonika m2
26 Stik penerima bh
27 Kabel NYY 1 x 70 mm2 m1
28 Conduit high impact m1
29 Socket bh
30 Grounding BC 70 mm2 m1
31 Pipa galvanis 1/4' m1
32 Splitzen 1' bh
33 Bak kontrol 30/30 tinggi 35 cm dan material suport bh
34 Exausvan unit
35 APAR unit
36 Material Bantu Bh
37 Labour cost Ls
38 Box Panel 8 group bh
39 MCB 1 phase 6 A MG bh
40 MCB 1 phase 4 6 MG bh
41 BC 6 MM bj

Singaraja, ……………………..
Dibuat Oleh :
DAFTAR HARGA SATUAN BAHAN DAN UPAH

TAHUN 2022

NO URAIAN SATUAN HARGA SATUAN KETERANGAN


1 2 3 4 5

A UPAH
1 Pekerja Oh Rp 102,500.00
2 Mandor Oh Rp 125,000.00
3 Kepala Tukang Kayu Oh Rp 115,000.00
4 Kepala Tukang Batu Oh Rp 115,000.00
5 Kepala Tukang Besi Oh Rp 115,000.00
6 Kepala Tukang Cat Oh Rp 115,000.00
7 Kepala Tukang Style Bali Oh Rp 115,000.00
8 Kepala Tukang Pipa Oh Rp 115,000.00
9 Kepala Tukang Listrik Oh Rp 115,000.00
10 Kepala Tukang Paras Oh Rp 115,000.00
11 Kepala Tukang Aluminium Oh Rp 115,000.00
12 Tukang Kayu Oh Rp 110,000.00
13 Tukang Batu Oh Rp 110,000.00
14 Tukang Besi Oh Rp 110,000.00
15 Tukang Cat Oh Rp 110,000.00
16 Tukang Politur Oh Rp 110,000.00
17 Tukang Style Bali Oh Rp 110,000.00
18 Tukang Pipa Oh Rp 110,000.00
19 Tukang Listrik Oh Rp 110,000.00
20 Tukang Aluminium Oh Rp 110,000.00
21 Tukang Gali Oh Rp 110,000.00
22 Tukang Ukir Paras Oh Rp 120,000.00
23 Tukang Style Bali
- Atap Alang-Alang Oh Rp 120,000.00
- Bata Gosok Dua Muka Oh Rp 120,000.00
- Bata Tulikup Oh Rp 120,000.00
- Batu Paras Diukir Oh Rp 120,000.00
- Batu Paras Siap Diukir Oh Rp 120,000.00

B LAIN -LAIN
1 Penyiapan RKK
- Penyiapan Dokumen Rencana Keselamatan Kontruksi ls Rp 200,000.00
2 -Petugas K3 Kontruksi oh Rp 120,000.00
3 -BPJS Ketenagakerjaan ls Rp 500,000.00
4 Pembersihan Awal ls Rp 1,000,000.00
5 Pembersihan Akhir ls Rp 1,000,000.00
6 Pembuatan Papan Nama Proyek ls Rp 400,000.00
7 Upah Pengeboran m1 Rp 30,000.00
8 Ongkos Pasang Rangka Baja Ringan C75 m2 Rp 25,000.00
9 Ongkos Pasang Rangka Baja Ringan UK75 m2 Rp 30,000.00
10 Ongkos Pembuatan 1 Unit Kusen Aluminium ls Rp 150,000.00
11 Ongkos Pasang Lispank Fiber Cement m1 Rp 20,000.00
12 Ongkos Pembuatan Ralling Besi Hollow m2 Rp 200,000.00
13 Ongkos Pembuatan Ralling Besi Stainles m2 Rp 300,000.00
14 Ongkos Pembuatan Pintu Harmonika m2 Rp 300,000.00
15 Ongkos Pasang Titik lampu ls Rp 55,000.00
16 Ongkos Pasang Saklar ls Rp 10,000.00
17 Ongkos Pasang Stop kontak ls Rp 65,000.00
18 Ongkos Pasang Loster bh Rp 10,000.00
19 Ongkos Sewa Mesin Bor Tanah jam Rp 5,000.00
20 Ongkos Bor Tanah m1 Rp 60,000.00
21 Ongkos Kendaraan ls Rp 200,000.00
22 Ongkos Pas. Box Panel bh Rp 1,000,000.00
23 Sewa Mesin Bor unit/m1 Rp 50,000.00
24 Amprah Listrik 7700 KWH ls Rp 8,000,000.00
25 Amprah Air PDAM ls Rp 3,500,000.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH

TAHUN 2022

NO URAIAN SATUAN HARGA SATUAN KETERANGAN


1 2 3 4 5

A BAHAN PASANGAN
1 Batu Pecah Besar m3 Rp 195,000.00
2 Batu Pecah 5 - 7 cm m3 Rp 310,000.00
3 Batu Pecah 2 - 3 cm m3 Rp 316,000.00
4 Batu Pecah 3 - 4 / 3-5 cm m3 Rp 335,000.00
5 Batu Pecah 1 - 2 cm m3 Rp 396,000.00
6 Batu Pecah 10-15 cm m3 Rp 195,000.00
7 Batu Pecah 0,5 - 1 cm m3 Rp 195,000.00
8 Batu Seplit Halus ( 0,5 - 1 ) cm m3 Rp 312,000.00
9 Batu Seplit Jagung (1 - 2) cm/ kasar m3 Rp 320,000.00
10 Pasir Batu (Sirtu) m3 Rp 125,000.00
11 Batu 5-7 cm m3 Rp 195,000.00
12 Batu 2-3 cm m3 Rp 195,000.00
13 Batu 3-5 cm m3 Rp 195,000.00
14 Batu 0,5-1 cm m3 Rp 195,000.00
15 Batu 1-2 cm m3 Rp 195,000.00
16 Batu Kali m3 Rp 195,000.00

B KERIKIL (KORAL)
1 Kerikil Biasa/ timbun m3 Rp 410,000.00
2 Kerikil Beton m3 Rp 240,000.00 177.78 kg
3 Kerikil Halus m3 Rp 420,000.00
4 Kerikil Sungai (tidak disaring) m3 Rp 410,000.00

C PASIR
1 Pasir Urug m3 Rp 150,000.00
2 Pasir Beton m3 Rp 180,000.00 128.57 kg
3 Pasir Pasang m3 Rp 150,000.00
4 Limestone m3 Rp 125,000.00

D TANAH
1 Tanah Urug m3 Rp 149,000.00

E BATU BATA
1 Bata Gosok klas I bj Rp 11,000.00
2 Bata Gosok klas II bj Rp 8,000.00
3 Bata Press Tulikup bj Rp 6,000.00
4 Bata Pasang klas I bj Rp 800.00
5 Bata Pasang klas II bj Rp 600.00
6 Batu Pipih Singaraja m3 Rp 300,000.00
7 Loster Terawang PC bj Rp 15,000.00
8 Roster Terawang Keramik 30 x 30 bj Rp 50,000.00

F PORTLAND CEMENT
1 Semen Gresik ( 40 kg ) zak 52,000.00 Rp 1,300 kg
2 Semen Tiga Roda (50 kg) zak 65,000.00 Rp 1,300 kg
3 Semen Bosowa (50 kg) zak 60,000.00 Rp 1,200 kg
4 Semen Warna kg 17,000.00

G BAHAN ATAP
1 Genteng Kodok Sejati bj 3,500.00
2 Bubungan Genteng Kodok Sejati bj 3,500.00
3 Genteng Goodyear bj 5,000.00
4 Bubungan Goodyear bj 15,000.00
5 Genteng Kaca 3 mm bj 8,000.00
6 Zincalume / spandeck 0,25 mm m2 50,500.00
7 Zincalume 0,25 mm/Trimdeck m2 50,500.00
8 Reng Zincalume (6m) btg 50,000.00
9 UK-75-75 M' 29,166.67
10 UK-75-55 M' 27,500.00
11 UK-65-55 M' 25,833.33
12 C-75-55 M' 21,666.67
13 Reng AA 0,45 Btg 50,000.00 8,333.33 m1
14 Skrup SDS 8 x 16 Bh 200.00
15 Skrup SDS 12 x 20 Bh 300.00
16 Skrup SDS 10 x 16 Bh 300.00
17 Dynabol 10 x 65 Bh 2,500.00
18 Diafrakma (PLD) Bh 3,000.00
19 Sepatu UK (PK) Bh 5,000.00
20 Dynabolt bh 4,000.00
21 Lisplank Fiber Cement btg 45,000.00

H SENG
1 Gelombang BJLS 0,18 mm lbr 70,000.00
2 Gelombang BJLS 0,20 mm lbr 85,000.00
3 Seng Talang 30 cm m 20,000.00
NO URAIAN SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5

I BAHAN KAYU
1 Kayu Jati Papan m3 12,000,000.00
2 Kayu Jati Balok m3 9,500,000.00
3 Kayu Jati Bali Papan m3 14,000,000.00
4 Kayu Jati Bali Balok m3 10,000,000.00
5 Kayu Kamper Papan 3/20 m3 8,000,000.00
6 Kayu Kamper Balok 8/12 m3 7,800,000.00
7 Kayu Kamper Balok 6/12 m3 7,800,000.00
8 Kayu Kamper Usuk 4/6 m3 9,500,000.00
9 Kayu Kamper Usuk 5/7 m3 9,500,000.00
10 Kayu Kamper Reng m3 9,500,000.00
11 Kayu Meranti Papan m3 Rp 3,500,000.00
12 Kayu Meranti Balok 8/12 m3 Rp 3,500,000.00
13 Kayu Meranti Balok 6/12 m3 Rp 3,500,000.00
14 Kayu Meranti Usuk 5/7 m3 Rp 3,500,000.00
15 Kayu Meranti Usuk 4/6 m3 Rp 3,500,000.00
16 Kayu Meranti Reng m3 Rp 3,500,000.00
17 Kayu Kruing Papan m3 Rp 7,450,000.00
18 Kayu Kruing Balok 8/12 m3 Rp 6,750,000.00
19 Kayu Kruing Balok 6/12 m3 Rp 6,750,000.00
20 Kayu Kruing Usuk 5/7 m3 Rp 7,450,000.00
21 Kayu Kruing Usuk 4/6 m3 Rp 7,450,000.00
22 Reng Kruing ikat Rp 7,450,000.00
23 Seseh Balok m3 3,700,000.00 Rp 106,560 btg
24 Papan begesting Lbr 25,000.00
25 Balok bingkirai m3 13,000,000.00
26 Papan bingkirai m3 15,000,000.00
27 Plywood 4 mm lbr 60,000.00
28 Plywood 9 mm lbr 85,000.00
29 Seseh Dolken mtr 10,000.00
30 Multipleks
31 - 6 mm lbr 80,000.00
32 - 9 mm lbr 100,000.00
33 - 12 mm lbr 180,000.00
34 - 18 mm lbr 380,000.00
35 Dolken kayu 8-10/4m btg 10,000.00
36 List Kayu 2/4 - 4 m btg 25,000.00 Rp 6,250 m1
37 Kayu profil btg 30,000.00
38 Kayu Perancah m3 3,000,000.00
Kayu Bingkerai Balok 8/12 m3 13,000,000.00

J BAHAN BAMBU
1 Bambu Besar btg 10,000.00
2 Bambu Sedang btg 8,000.00
3 Bambu Kecil btg 7,000.00
4 Gedeg Kelas I m2 40,000.00
5 Gedeg Kelas II m2 30,000.00

K BETON CETAK
1 Buis Beton 50/1 m` bj 115,000.00
2 Buis Beton 30/1 m` bj 100,000.00
3 Buis Beton 25/1 m` bj 85,000.00
4 Buis Beton 20/1 m` bj 75,000.00
5 Buis Beton 50/0,75 m` bj 95,000.00
6 Buis Beton 30/0,75 m` bj 85,000.00
7 Buis Beton 25/0,75 m` bj 75,000.00
8 Buis Beton 20/0,75 m` bj 65,000.00
9 Buis Beton dia 1 m, H = 0,5 m, t = 0,05 m bj 130,000.00
10 Batako Cetak Buntu KW I bj 2,800.00
11 Paving Blok / 6 cm m2 85,000.00
12 Paving Blok / 8 cm m2 105,000.00

L KERAMIK
1 Keramik KW I 25/40 cm m2 55,000.00 Rp 5,500 bh
2 Keramik KW I 20/20 cm m2 55,000.00
3 Keramik KW I 30/30 cm putih polos m2 55,000.00 Rp 5,000 bh
4 Keramik KW I 40/40 cm putih polos m2 55,000.00 Rp 9,167 bh
5 Kramik 10 x 30 cm m3 1,666.67
6 Kramik 10 x 40 cm m4 2,291.67
7 Ubin Pemandu m2 180,000.00 Rp 16,364 bh
8 Granit 30x60 cm m2 150,000.00 Rp 25,000 bh

M BAHAN BESI
1 Besi Beton Polos
- besi Ø 4 mm ljr / btg 26,000.00 Rp 22,015 hrg/kg
- besi Ø 6 mm ljr / btg 32,000.00 Rp 12,043 hrg/kg
- besi Ø 8 mm ljr / btg 55,000.00 Rp 11,643 hrg/kg
- besi Ø 10 mm ljr / btg 86,000.00 Rp 11,651 hrg/kg
NO URAIAN SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5

- besi Ø 12 mm ljr / btg 123,000.00 Rp 11,572 hrg/kg


- besi Ø 16 mm ljr / btg 246,500.00 Rp 13,045 hrg/kg
- besi Ø 18 mm ljr / btg 347,500.00 Rp 14,531 hrg/kg
- besi Ø 22 mm ljr / btg 520,500.00 Rp 14,570 hrg/kg
- besi Ø 24 mm ljr / btg 620,000.00 Rp 14,583 hrg/kg
NO URAIAN SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5

2 Besi Beton ulir -


- besi D 13 mm ljr 162,500.00 Rp 13,027
- besi D 16 mm ljr 246,500.00 Rp 13,045
- besi D 19 mm ljr 347,500.00 Rp 13,041
Rp 13,000 hrg/kg
(Rata-rata harga)
N KAWAT
1 Kawat Ikat Beton kg 18,000.00
2 Kawat nyamuk 1 x 2 m m2 40,000.00
3 Kawat Harmonika 5 x 5 cm m2 55,000.00
4 Kawat Harmonika 4 x 4 cm m2 60,000.00
5 Kawat Harmonika 3 x 3 cm m2 65,000.00
6 Kawat 4 mm kg 30,000.00
7 Besi Strip kg 12,000.00
8 Besi Profil WF kg 13,000.00

O BAHAN PLAFON
1 Triplek 3 mm lbr 55,000.00
2 Teak Wood 4 mm lbr 60,000.00
3 Teak Wood 3 mm lbr 55,000.00
4 Aluminium Foil (Pj=60, l=100) glg 350,000.00
5 Kalsiboard lbr 67,000.00
6 Gypsum lbr 50,000.00
7 List Gypsum m' 5,000.00
8 Rangka metal hollow 40.40.4 mm m' 6,000.00 Rp 750
9 Assesories (perkuatan, las dll) ls 75.00

P BAHAN PIPA
1 Pipa PVC AW
- ø 4" btg 349,157.00 Rp 87,289 m1
- ø 3" btg 210,738.00 Rp 52,685 m1
- ø 2,5" btg 110,000.00 Rp 27,500 m1
- ø 2" btg 100,000.00 Rp 25,000 m1
- ø 1,5" btg 85,000.00 Rp 21,250 m1
- ø 1" btg 80,000.00 Rp 20,000 m1
- ø 0,75" btg 55,000.00 Rp 13,750 m1
- ø 0,5" btg 35,000.00 Rp 8,750 m1
2 Pipa PVC C
- ø 4" btg 100,000.00
3 Pipa PVC D
- ø 4" btg 120,000.00
- ø 3" btg 100,000.00
- ø 2,5" btg 90,000.00
- ø 2" btg 80,000.00
- ø 1,5" btg 75,000.00
- ø 1" btg 60,000.00
- ø 0,75" btg 45,000.00
- ø 0,5" btg 25,000.00
4 Pipa listrik btg 10,000.00
5 Pipa Paralon 5/8 " btg 15,000.00

Q BAHAN FINISHING
1 Amplas lbr 10,000.00
2 Minyak Cat ltr 20,000.00
3 Meni kayu kg 45,000.00
4 Plamir kayu kg 45,000.00
5 Cat Dasar Kayu kg 50,000.00
6 Cat Kayu kg 55,000.00
7 Plamir Tembok kg 18,000.00
8 Cat Dasar Tembok kg 24,000.00
9 Cat Tembok Interior kg 32,000.00
10 Cat Tembok Eksterior kg 37,000.00
11 Meni Besi kg 55,000.00
12 Dempul kg 55,000.00
13 Cat Besi kg 55,000.00
14 Politur ltr 80,000.00
15 Politur jadi ( Ultran ) ltr 80,000.00
16 Teak Oil ltr 80,000.00
17 Spritus ltr 30,000.00
18 Lem Kayu kg 17,000.00
19 Impra kg 60,000.00
20 Kuas bh 18,000.00

R BAHAN KACA
1 Kaca Bening 3 mm m2 Rp 130,000.00
2 Kaca Bening 5 mm m2 Rp 110,000.00
3 Kaca Bening 6 mm m2 Rp 135,000.00
4 Kaca Bening 8 mm m2 Rp 315,000.00

S ALAT PENGUNCI
1 Kunci Handle Komplit bh 475,000.00
2 Kunci Double Handle Komplit bh 800,000.00
3 Kunci Sleding Handle Komplit bh 400,000.00
NO URAIAN SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5

4 Kunci KM/ WC bh 300,000.00


5 Kunci Gembok bh 50,000.00
6 Grendel Pintu bh 65,000.00
7 Grendel Jendela bh 50,000.00
8 Rel Pintu Sleding bh 350,000.00
9 Espagnolet bh 225,000.00

T ALAT PENGGANTUNG
1 Kait Angin psg 45,000.00
2 Engsel Pintu psg 60,000.00
3 Engsel Jendela psg 50,000.00
4 Espanolet bh 225,000.00

U BAHAN SANITAIR
1 Washtafel bh 450,000.00
2 Urinoir bh 1,650,000.00
3 Closet Jongkok bh 300,000.00
4 Closet Duduk bh 1,800,000.00
5 Perlengkapan Closet Duduk ls 1,800,000.00
6 Bak Mandi Fiber bh 370,000.00
7 Bak Mandi Keramik bh 365,000.00
8 Floordrain bh 120,000.00
9 Jet Shower bh 300,000.00
10 Kran Air bh 100,000.00

V BAHAN PAKU
1 Paku Lis kg 20,000.00
2 Paku Reng kg 20,000.00
3 Paku Usuk kg 20,000.00
4 Paku Seng kg 20,000.00
5 Paku Sekrup 1/2" ktk 80,000.00
6 Paku Sekrup 2" ktk 100,000.00
7 Paku gypsum kg 80,000.00
8 Paku beton 5 cm kg 55,000.00
9 Paku beton 3" ktk 20,000.00
10 Paku pancing ktk 20,000.00
11 Skrup fixer bh 100.00
12 Sealant bh 45,000.00
13 Accessories Kusen Aluminuim ls -
14 Accessories Pintu Aluminuim ls -

W BAHAN LISTRIK
1 NYY 3 x 2.5 mm2 M' 20,000.00
2 NYM 3 x 2.5 mm2 M' 13,000.00
3 Conduit high impact M' 10,000.00
4 Socket Bh 2,000.00
5 Cleam + Fisher ulir Bh 500.00
6 Saklar Tungal bh 17,500.00
7 Saklar Ganda bh 25,000.00
8 Stop Kontak bh 25,000.00
9 Bok MK bh 3,500.00
10 Fitting Lampu broco bh 15,000.00
11 Pas. Lampu LED 18 watt philips Bh 120,000.00
12 Pas. Lampu LED 14 watt philips Bh 100,000.00

X LAIN-LAIN
1 Papan Informasi K3 ukuran 3m x 1m unit 400,000.00
2 Pelindung pernafasan (Masker) bh 10,000.00
3 Topi pelindung (Safety Helmet) bh 45,000.00
4 Rompi keselamatan (Safety Vest) bh 40,000.00
5 Kotak P3K bh 200,000.00
6 Rambu Peringatan bh 50,000.00
7 Pita pengaman/pembatas area pekerjaan bh 50,000.00
8 Loster 25 x 25 cm bh 40,000.00
9 Solar ltr 7,000.00
10 Oli Bh 20,000.00
11 Sikat Ijuk buah 8,000.00
12 Aluminium 4" m' 100,000.00
13 Aluminium (bahan jendela) m' 80,000.00
14 Daun Pintu SWP m2 300,000.00
15 Aluminium Slet m' 50,000.00
16 Ikut Celedu Paras bh 150,000.00
17 Murda Paras bh 150,000.00
18 Pipa Galvanis 2 x 4 cm m 23,000.00
19 Pipa Galvanis 4 x 6 cm m 30,000.00
20 Pipa Stainless Ø 2" m 50,000.00
21 Dynabolt 10 mm m 5,000.00
22 Accssesories m 10,000.00
23 Kawat Las btg 600.00
24 Jaring Kawat m2 20,000.00
25 Pintu Harmonika m2 625,000.00
26 Stik penerima bh 150,000.00
NO URAIAN SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5

27 Kabel NYY 1 x 70 mm2 m1 70,000.00


28 Conduit high impact m1 5,000.00
29 Socket bh 65,000.00
30 Grounding BC 70 mm2 m1 65,000.00
31 Pipa galvanis 1/4' m1 20,000.00
32 Splitzen 1' bh 80,000.00
33 Bak kontrol 30/30 tinggi 35 cm dan material suport bh 250,000.00
34 Exausvan unit 300,000.00
35 APAR unit 200,000.00
36 Material Bantu Bh 50,000.00
37 Labour cost Ls -
38 Box Panel 8 group bh 180,000.00
39 MCB 1 phase 6 A MG bh 80,000.00
40 MCB 1 phase 4 6 MG bh 65,000.00
41 BC 6 MM bj 28,000.00
Grani 60x60 Polis dus 135,000.00
Granit 60x60 Anpolis dus 175,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
TAHUN 2022
1 A.1 1 M1 Pasang Lisplank Fiber Cement 0.8 x 20 cm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Pasang ls 1.0000 20,000.00 20,000.00
JUMLAH TENAGA KERJA 20,000.00
B. BAHAN
Lisplank Fiber Cement Btg 0.3333 45,000.00 15,000.00
Paku sekrup 1/2" kg 0.0500 80,000.00 4,000.00
Baja Ringan Type C- 75, 0.55 m1 1.1000 21,666.67 23,833.33
JUMLAH HARGA BAHAN 42,833.33

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 62,833.33
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 62,833.33

2 A.2 Pemasangan 1 m kusen pintu dan jendela aluminium


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0430 102,500.00 4,407.50
Tukang khusus alluminium L.03 OH 0.4445 110,000.00 48,894.95
Kepala Tukang L.05 OH 0.0042 115,000.00 481.85
Mandor L.17 OH 0.0021 125,000.00 262.50
JUMLAH TENAGA KERJA 54,046.80
B. BAHAN
Profil alluminium m 1.1000 65,000.00 71,500.00
Skrup fixer bh 2.0000 100.00 200.00
Sealant Tube 0.0600 45,000.00 2,700.00
JUMLAH HARGA BAHAN 74,400.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 128,446.80
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 128,446.80

3 A.3 Pemasangan 1 Unit pintu aluminium


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Pembuatan I Unit Pintu ls 1.0000 150,000.00 150,000.00
JUMLAH TENAGA KERJA 150,000.00
B. BAHAN
Aluminium 4" m 4.5371 100,000.00 453,706.67
Slet m 10.0000 50,000.00 500,000.00
Sealant tube 0.2700 45,000.00 12,150.00
JUMLAH HARGA BAHAN 965,856.67
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 1,115,856.67
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 1,115,856.67

4 A.4 Pemasangan 1 m2 Daun jendela aluminium + Kaca 8 mm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0850 102,500.00 8,712.50
Tukang alluminium/kaca L.03 OH 0.0850 110,000.00 9,350.00
Kepala Tukang L.05 OH 0.0090 115,000.00 1,035.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 19,722.50
B. BAHAN
Aluminium (bahan jendela) m 4.4000 80,000.00 352,000.00
Kaca bening t = 8mm m 1.1000 315,000.00 346,500.00
Sealant tube 0.1000 45,000.00 4,500.00
JUMLAH HARGA BAHAN 703,000.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 722,722.50
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 722,722.50

5 A.5 Pembuatan daun pintu SWP (SWP Multipleks Lapis HPL;pabrikasi) per m2
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5000 102,500.00 51,250.00
Tukang Kayu OH 1.4500 110,000.00 159,500.00
Kepala Tukang OH 0.1200 115,000.00 13,800.00
Mandor OH 0.0200 125,000.00 2,500.00
JUMLAH TENAGA KERJA 227,050.00
B. BAHAN
Daun pintu SWP m2 1.0000 300,000.00 300,000.00
JUMLAH HARGA BAHAN 300,000.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 527,050.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 527,050.00

6 A.6 Pemasangan 1 m2 Ralling Besi Hollow galvanis


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Kerja m2 1.0000 200,000.00 200,000.00
JUMLAH TENAGA KERJA 200,000.00
B. BAHAN
Pipa Galvanis 2 x 4 cm m 4.0000 23,000.00 92,000.00
Pipa Galvanis 4 x 4 cm m 4.0000 30,000.00 120,000.00
Kawat Las btg 25.0000 600.00 15,000.00
Dempul kg 0.2593 55,000.00 14,259.26
Jaring Kawat m2 1.1000 20,000.00 22,000.00
Minyak Cat ltr 0.5000 20,000.00 10,000.00
Cat Besi kg 0.5000 55,000.00 27,500.00
JUMLAH HARGA BAHAN 300,759.26
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 500,759.26
E. Overhead & Profit 15% x D 75,113.89
F. Harga Satuan Pekerjaan (D+E) 575,873.15

7 A.7 Pemasangan 1 m2 Ralling Besi Stainless


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Kerja m2 1.0000 300,000.00 300,000.00
JUMLAH TENAGA KERJA 300,000.00
B. BAHAN
Pipa Stainless Ø 2" m 4.0000 50,000.00 200,000.00
Dynabolt 10 mm m 4.0000 5,000.00 20,000.00
Accssesories btg 1.0000 10,000.00 10,000.00
JUMLAH HARGA BAHAN 230,000.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 530,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 530,000.00

8 A.8 Pemasangan 1 m2 Pintu Harmonika


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Kerja m2 1.0000 300,000.00 300,000.00
JUMLAH TENAGA KERJA 300,000.00
B. BAHAN
Pintu Harmonika m2 1.0000 625,000.00 625,000.00
JUMLAH HARGA BAHAN 625,000.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 925,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 925,000.00

9 A.9 Pembuatan 1 Unit Septiktank + Peresapan Buis Beton


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

1 Galian Tanah m³ 6.88 104,000.00 715,104.00


2 Pek. Pas. Bata 1 Pc : 5 Ps m² 12.23 120,109.00
3 Pek. Plesteran 1 Pc : 5 Ps m² 12.07 58,235.08
4 Pek. Rabatan K100 m³ 0.33 823,398.57
5 Pek. Ring Beton 15 x 15 cm
Beton K175 m³ 0.03 917,417.62
Pembesian kg 8.19 20,199.40
Begesting m² 0.68 173,090.67
6 Pek. Plat Penutup Septiktank 8 cm -
Beton K175 m³ 0.35 917,417.62 323,664.94
Pembesian kg 21.93 20,199.40 442,913.96
Begesting m² 4.41 342,738.50 1,511,476.79
7 Pek. Pas. Pipa 4 " m¹ 4.00 202,980.54 811,922.15
8 Pek. Pas. Pipa 3/4" m¹ 0.50 135,501.28 67,750.64
9 Buis 100 cm bh 12.00 115,000.00 1,380,000.00

D. Jumlah (A + B + C) 5,252,832.47
E. Overhead & Profit 15% x D 787,924.87
F. Harga Satuan Pekerjaan (D+E) 6,040,757.33

10 A.10 Pembuatan 1 Unit Penangkal Petir


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

Penangkal petir
Stik penerima Bh 1.00 150,000.00 150,000.00
Material Bantu Bh 1.00 50,000.00 50,000.00
Labour cost Ls 1.00 - -
Kabel -
NYY 1 x 70 mm2 m' 35.00 70,000.00 2,450,000.00
Conduit high impact m' 35.00 10,000.00 350,000.00
Socket bh 5.00 2,000.00 10,000.00
Material bantu Ls 1.00 50,000.00 50,000.00
Labor cost Ls 1.00 - -
Grounding -
Grounding BC 70 mm2 m' 12.00 65,000.00 780,000.00
Pipa galvanis 1/4' m' 12.00 20,000.00 240,000.00
Splitzen 1' bh 1.00 80,000.00 80,000.00
Material bantu Ls 1.00 50,000.00 50,000.00
Labor cost Ls 1.00 - -
1 bh Bak kontrol 30/30 tinggi 35 cm dan material
unit 1.00 250,000.00 250,000.00
suport

D. Jumlah (A + B + C) 4,460,000.00
E. Overhead & Profit 30% x D 1,338,000.00
F. Harga Satuan Pekerjaan (D+E) 5,798,000.00

11 A.11 Pembuatan Box Panel


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 1,000,000.00 1,000,000.00
JUMLAH TENAGA KERJA 1,000,000.00
B. BAHAN
Box Panel 8 group bh 1.0000 180,000.00 180,000.00
MCB 1 phase 6 A MG bh 2.0000 80,000.00 160,000.00
MCB 1 phase 4 6 MG bh 5.0000 65,000.00 325,000.00
BC 6 MM bj 6.0000 28,000.00 168,000.00

JUMLAH HARGA BAHAN 833,000.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,833,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 1,833,000.00

12 A.12 Pemasangan 1 bh Loster 20 x 20 cm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Pasang ls 1.0000 10,000.00 10,000.00
JUMLAH TENAGA KERJA 10,000.00
B. BAHAN
Loster 25 x 25 bh 1.0000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 15,000.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 25,000.00
E. Overhead & Profit 30% x D 7,500.00
F. Harga Satuan Pekerjaan (D+E) 32,500.00

Pemasangan 1 m2 granit ukuran 60 cm x 60 cm


KOEFISIEN
No URAIAN KODE SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4 5 6 7
A TENAGA KERJA
1 Pekerja L.01 OH 0.5000 Rp 102,500.00 Rp 51,250.00
2 Tukang batu/tembok L.06 OH 0.2500 Rp 110,000.00 Rp 27,500.00
3 Kepala Tukang batu/tembok L.20 OH 0.0350 Rp 115,000.00 Rp 4,025.00
4 Mandor L.34 OH 0.0350 Rp 125,000.00 Rp 4,375.00

JUMLAH HARGA TENAGA KERJA Rp 87,150.00


B BAHAN
1 Granit 60 x 60 cm Bh 2.8611 Rp 33,750.00 Rp 96,562.50
2 Semen Portland Kg 8.1900 Rp 1,300.00 Rp 10,647.00
3 Semen warna Kg 1.6200 Rp 17,000.00 Rp 27,540.00
4 Pasir pasang m3 0.0450 Rp 150,000.00 Rp 6,750.00

JUMLAH HARGA BAHAN Rp 141,499.50


C PERALATAN

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan JUMLAH HARGA PERALATAN Rp -
D (A+B+C) Rp 228,649.50
E Overhead + Profit 25% x D Rp 57,162.38
F Harga Satuan Pekerjaan (D+E) Rp 285,811.88

Pemasangan 1 m2 granit ukuran 60 cm x 60 cm Unpolish


KOEFISIEN
No URAIAN KODE SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4 5 6 7
A TENAGA KERJA
1 Pekerja L.01 OH 0.5000 Rp 102,500.00 Rp 51,250.00
2 Tukang batu/tembok L.06 OH 0.2500 Rp 110,000.00 Rp 27,500.00
3 Kepala Tukang batu/tembok L.20 OH 0.0350 Rp 115,000.00 Rp 4,025.00
4 Mandor L.34 OH 0.0350 Rp 125,000.00 Rp 4,375.00

JUMLAH HARGA TENAGA KERJA Rp 87,150.00


B BAHAN
1 Granit 60 x 60 cm Unpolish Bh 2.8611 Rp 58,333.33 Rp 166,898.15
2 Semen Portland Kg 8.1900 Rp 1,300.00 Rp 10,647.00
3 Semen warna Kg 1.6200 Rp 17,000.00 Rp 27,540.00
4 Pasir pasang m3 0.0450 Rp 150,000.00 Rp 6,750.00

JUMLAH HARGA BAHAN Rp 211,835.15


C PERALATAN

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan JUMLAH HARGA PERALATAN Rp -
D (A+B+C) Rp 298,985.15
E Overhead + Profit 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 298,985.15

Pemasangan 1 m2 dinding Granit ukuran 60 cm x 60 cm


KOEFISIEN
No URAIAN KODE SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4 5 6 7
A TENAGA KERJA
1 Pekerja L.01 OH 0.6000 Rp 102,500.00 Rp 61,500.00
2 Tukang batu/tembok L.06 OH 0.3000 Rp 110,000.00 Rp 33,000.00
3 Kepala Tukang batu/tembok L.20 OH 0.0450 Rp 115,000.00 Rp 5,175.00
4 Mandor L.34 OH 0.0450 Rp 125,000.00 Rp 5,625.00

JUMLAH HARGA TENAGA KERJA Rp 105,300.00


B BAHAN
1 Granit 60 x 60 cm Bh 2.8611 Rp 33,750.00 Rp 96,562.50
2 Semen Portland Kg 9.3000 Rp 1,300.00 Rp 12,090.00
3 Semen warna Kg 1.9400 Rp 17,000.00 Rp 32,980.00
4 Pasir pasang m3 0.0180 Rp 150,000.00 Rp 2,700.00

JUMLAH HARGA BAHAN Rp 144,332.50


C PERALATAN

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan JUMLAH HARGA PERALATAN Rp -
D (A+B+C) Rp 249,632.50
E Overhead + Profit 0% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp 249,632.50

Pemasangan 1 m’ plint Granit ukuran 10 cm x 60 cm


KOEFISIEN
No URAIAN KODE SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4 5 6 7
A TENAGA KERJA
1 Pekerja L.01 OH 0.0750 Rp 102,500.00 Rp 7,687.50
2 Tukang batu/tembok L.06 OH 0.0750 Rp 110,000.00 Rp 8,250.00
3 Kepala Tukang batu/tembok L.20 OH 0.0075 Rp 115,000.00 Rp 862.50
4 Mandor L.34 OH 0.0380 Rp 125,000.00 Rp 4,750.00

JUMLAH HARGA TENAGA KERJA Rp 21,550.00


B BAHAN
1 Plint Granit bh 1.7500 Rp 5,625.00 Rp 9,843.75
2 Semen Portland Kg 1.1400 Rp 1,300.00 Rp 1,482.00
3 Pasir pasang m3 0.0030 Rp 150,000.00 Rp 450.00
4 Semen warna Kg 0.1000 Rp 17,000.00 Rp 1,700.00

JUMLAH HARGA BAHAN Rp 13,475.75


C PERALATAN

Jumlah Harga Tenaga Kerja, Bahan dan Peralatan JUMLAH HARGA PERALATAN Rp -
D (A+B+C) Rp 35,025.75
E Overhead + Profit 30% x D Rp 10,507.73
F Harga Satuan Pekerjaan (D+E) Rp 45,533.48

Pek. 1 m2 Pasasangan Genteng Bitumen Monolayer 3 mm Onduline Tile Red


KOEFISIEN
No URAIAN KODE SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A UPAH + BAHAN Rp 85,000.00


B Overhead + Profit 0% A Rp -
C Harga Satuan Pekerjaan (A+B) Rp 85,000.00

Pek. 1 m Pasasangan Nok Bitumen


KOEFISIEN
No URAIAN KODE SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A UPAH + BAHAN Rp 75,000.00


B Overhead + Profit 0% A Rp -
C Harga Satuan Pekerjaan (A+B) Rp 75,000.00

Pek. 1 m2 Waterprofing
KOEFISIEN
No URAIAN KODE SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A UPAH + BAHAN Rp 35,000.00


B Overhead + Profit 0% A Rp -
C Harga Satuan Pekerjaan (A+B) Rp 35,000.00

Pek. 1 m2 Waterprofing Sika


KOEFISIEN
No URAIAN KODE SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A UPAH + BAHAN Rp 45,000.00


B Overhead + Profit 0% A Rp -
C Harga Satuan Pekerjaan (A+B) Rp 45,000.00

Pek. 1 m2 Finishing Dinding Bata Merah


KOEFISIEN
No URAIAN KODE SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A UPAH + BAHAN Rp 450,000.00


B Overhead + Profit 0% A Rp -
C Harga Satuan Pekerjaan (A+B) Rp 450,000.00

Pek. 1 m2 Finishing Dinding Semen Exposh


KOEFISIEN
No URAIAN KODE SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A UPAH + BAHAN Rp 85,000.00


B Overhead + Profit 0% A Rp -
C Harga Satuan Pekerjaan (A+B) Rp 85,000.00

Pek. 1 m2 Besi Wiremesh M8


KOEFISIEN
No URAIAN KODE SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A UPAH + BAHAN Rp 74,955.91


B Overhead + Profit 30% A Rp 22,486.77
C Harga Satuan Pekerjaan (A+B) Rp 97,442.68
REKAPITULASI DAFTAR ANALISA HARGA SATUAN PEKERJAAN

TAHUN 2022

NO URAIAN PEKERJAAN HARGA


1 2 3

1 A.1 1 M1 Pasang Lisplank Fiber Cement 0.8 x 20 cm Rp 62,833.33


2 A.2 Pemasangan 1 m kusen pintu dan jendela aluminium Rp 128,446.80
3 A.3 Pemasangan 1 Unit pintu aluminium Rp 1,115,856.67
4 A.4 Pemasangan 1 m2 Daun jendela aluminium + Kaca 8 mm Rp 722,722.50
5 A.5 Pembuatan daun pintu SWP (SWP Multipleks Lapis HPL;pabrikasi) per m2 Rp 527,050.00
6 A.6 Pemasangan 1 m2 Ralling Besi Hollow galvanis Rp 575,873.15
7 A.7 Pemasangan 1 m2 Ralling Besi Stainless Rp 530,000.00
8 A.8 Pemasangan 1 m2 Pintu Harmonika Rp 925,000.00
9 A.9 Pembuatan 1 Unit Septiktank + Peresapan Buis Beton Rp 6,040,757.33
10 A.10 Pembuatan 1 Unit Penangkal Petir Rp 5,798,000.00
11 A.11 Pembuatan Box Panel Rp 1,833,000.00
12 A.12 Pemasangan 1 bh Loster 20 x 20 cm Rp 32,500.00

Singaraja, ……………
Dibuat Oleh :
XV 6.1.1 PEKERJAAN ELECTRIKAL
1 6.1.1.1 Pekerjaan Instalasi titik lampu
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Pasang Ls 1.000 55,000.00 55,000.00
JUMLAH TENAGA KERJA 55,000.00
B. BAHAN
NYM 3 x 2.5 mm2 supreme M' 6.0000 13,000.00 78,000.00
Conduit high impact M' 6.0000 10,000.00 60,000.00
Socket Bh 3.0000 2,000.00 6,000.00
Cleam + Fisher ulir Bh 4.0000 500.00 2,000.00
Fitting Lampu bh 1.0000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 161,000.00

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 216,000.00
E. Overhead & Profit 15% x D 32,400.00
F. Harga Satuan Pekerjaan (D+E) 248,400.00

2 6.1.1.2 Pekerjaan Instalasi titik Saklar/Stopkontak


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Pasang Ls 1.000 55,000.00 55,000.00
JUMLAH TENAGA KERJA 55,000.00
B. BAHAN
NYM 3 x 2.5 mm2 supreme M' 7.0000 13,000.00 91,000.00
Conduit high impact M' 7.0000 10,000.00 70,000.00
Socket Bh 3.0000 2,000.00 6,000.00
Cleam + Fisher ulir Bh 6.0000 500.00 3,000.00
JUMLAH HARGA BAHAN 170,000.00

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 225,000.00
E. Overhead & Profit 15% x D 33,750.00
F. Harga Satuan Pekerjaan (D+E) 258,750.00

3 6.1.1.3 Pasang Saklar Tunggal


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Pasang Ls 1.000 10,000.00 10,000.00
JUMLAH TENAGA KERJA 10,000.00
B. BAHAN
Saklar Tunggal broco M' 1.0000 17,500.00 17,500.00
Bok MK M' 1.0000 3,500.00 3,500.00
JUMLAH HARGA BAHAN 21,000.00

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 31,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 31,000.00
4 6.1.1.4 Pasang Saklar Ganda
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Pasang Ls 1.000 10,000.00 10,000.00
JUMLAH TENAGA KERJA 10,000.00
B. BAHAN
Saklar Ganda broco M' 1.0000 25,000.00 25,000.00
Bok MK M' 1.0000 3,500.00 3,500.00
JUMLAH HARGA BAHAN 28,500.00

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 38,500.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 38,500.00

5 6.1.1.5 Pasang Stopkontak


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Pasang Ls 1.000 10,000.00 10,000.00
JUMLAH TENAGA KERJA 10,000.00
B. BAHAN
Stopkontak broco M' 1.0000 25,000.00 25,000.00
Bok MK M' 1.0000 3,500.00 3,500.00
JUMLAH HARGA BAHAN 28,500.00

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 38,500.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 38,500.00

2 6.1.1.2 Pekerjaan Instalasi Exhausfan


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Ongkos Pasang Ls 1.000 55,000.00 55,000.00
JUMLAH TENAGA KERJA 55,000.00
B. BAHAN
Exhausfan bh 1.0000 190,000.00 190,000.00
NYM 3 x 2.5 mm2 supreme M' 7.0000 13,000.00 91,000.00
Conduit high impact M' 7.0000 10,000.00 70,000.00
Socket Bh 3.0000 2,000.00 6,000.00
Cleam + Fisher ulir Bh 6.0000 500.00 3,000.00
JUMLAH HARGA BAHAN 360,000.00

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 415,000.00
E. Overhead & Profit 15% x D 62,250.00
F. Harga Satuan Pekerjaan (D+E) 477,250.00
XIV 5.1.1 PEKERJAAN SANITASI DALAM GEDUNG
1 5.1.1.1 Memasang 1 Buah Kloset Duduk
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 3.3000 102,500.00 338,250.00
Tukang batu L.02 OH 1.1000 110,000.00 121,000.00
Kepala Tukang L.03 OH 0.0100 115,000.00 1,150.00
Mandor L.17 OH 0.1600 125,000.00 20,000.00
JUMLAH TENAGA KERJA 480,400.00
B. BAHAN
Kloset duduk Bh 1.0000 1,800,000.00 1,800,000.00
Perlengkapan Ls 6% 1,800,000.00 108,000.00
JUMLAH HARGA BAHAN 1,908,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,388,400.00
E. Overhead & Profit 15% x D 358,260.00
F. Harga Satuan Pekerjaan (D+E) 2,746,660.00

2 5.1.1.2 Memasang 1 Buah Kloset Jongkok Porselin


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.0000 102,500.00 102,500.00
Tukang batu L.02 OH 1.5000 110,000.00 165,000.00
Kepala Tukang L.03 OH 0.1500 115,000.00 17,250.00
Mandor L.17 OH 0.1600 125,000.00 20,000.00
JUMLAH TENAGA KERJA 304,750.00
B. BAHAN
Kloset jongkok porselen Bh 1.0000 300,000.00 300,000.00
Semen Portland Kg 6.0000 1,300.00 7,800.00
Pasir pasang m3 0.0100 150,000.00 1,500.00
JUMLAH HARGA BAHAN 309,300.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 614,050.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 614,050.00

3 5.1.1.3 Memasang 1 Buah Urinoir


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.0000 102,500.00 102,500.00
Tukang batu L.02 OH 1.0000 110,000.00 110,000.00
Kepala Tukang L.03 OH 0.1000 115,000.00 11,500.00
Mandor L.17 OH 0.0500 125,000.00 6,250.00
JUMLAH TENAGA KERJA 230,250.00
B. BAHAN
Urinoir Bh 1.0000 1,650,000.00 1,650,000.00
Semen Portland Kg 6.0000 1,300.00 7,800.00
Pasir pasang m3 0.0100 150,000.00 1,500.00
Perlengkapan % 30.00% 1,650,000.00 495,000.00
JUMLAH HARGA BAHAN 2,154,300.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,384,550.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 2,384,550.00
4 5.1.1.4 Memasang 1 Buah Wastafel
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.2000 102,500.00 123,000.00
Tukang batu L.02 OH 1.4500 110,000.00 159,500.00
Kepala Tukang L.03 OH 0.1500 115,000.00 17,250.00
Mandor L.17 OH 0.0600 125,000.00 7,500.00
JUMLAH TENAGA KERJA 307,250.00
B. BAHAN
Wastafel Bh 1.0000 450,000.00 450,000.00
Semen Portland Kg 6.0000 1,300.00 7,800.00
Pasir pasang m3 0.0100 150,000.00 1,500.00
Perlengkapan % 12.00% 450,000.00 54,000.00
JUMLAH HARGA BAHAN 513,300.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 820,550.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 820,550.00

4 5.1.1.4 Memasang 1 Buah Shower


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.2000 102,500.00 123,000.00
Tukang batu L.02 OH 1.4500 110,000.00 159,500.00
Kepala Tukang L.03 OH 0.1500 115,000.00 17,250.00
Mandor L.17 OH 0.0600 125,000.00 7,500.00
JUMLAH TENAGA KERJA 307,250.00
B. BAHAN
Wastafel Bh 1.0000 1,350,000.00 1,350,000.00
Semen Portland Kg 6.0000 1,300.00 7,800.00
Pasir pasang m3 0.0100 150,000.00 1,500.00
Perlengkapan % 12.00% 450,000.00 54,000.00
JUMLAH HARGA BAHAN 1,413,300.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,720,550.00
E. Overhead & Profit 15% x D 258,082.50
F. Harga Satuan Pekerjaan (D+E) 1,978,632.50

5 5.1.1.5 Memasang 1 Bh Floor Drain


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 102,500.00 1,025.00
Tukang batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 115,000.00 1,150.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 13,800.00
B. BAHAN
Floor Drain Bh 1.0000 120,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 133,800.00
E. Overhead & Profit 15% x D 20,070.00
F. Harga Satuan Pekerjaan (D+E) 153,870.00

5 5.1.1.5 Memasang 1 Bh Floor Drain Outdoor


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 102,500.00 1,025.00
Tukang batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 115,000.00 1,150.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 13,800.00
B. BAHAN
Floor Drain Bh 1.0000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 100,000.00
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 113,800.00
E. Overhead & Profit 15% x D 17,070.00
F. Harga Satuan Pekerjaan (D+E) 130,870.00

6 5.1.1.6 Memasang 1 Bh Kran Air


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 102,500.00 1,025.00
Tukang batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 115,000.00 1,150.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 13,800.00
B. BAHAN
Kran 1/2 " Bh 1.0000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 100,000.00
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 113,800.00
E. Overhead & Profit 30% x D 34,140.00
F. Harga Satuan Pekerjaan (D+E) 147,940.00
7 5.1.1.7 Memasang 1 Bh Jet Sower
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0100 102,500.00 1,025.00
Tukang batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 115,000.00 1,150.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 13,800.00
B. BAHAN
Jet Shower Bh 1.0000 300,000.00 300,000.00
JUMLAH HARGA BAHAN 300,000.00
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 313,800.00
E. Overhead & Profit 30% x D 94,140.00
F. Harga Satuan Pekerjaan (D+E) 407,940.00

8 5.1.1.8 1 M' Pas. Pipa PVC Tipe AW 0.5"


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.036 102,500.00 3,690.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala Tukang L.03 OH 0.006 115,000.00 690.00
Mandor L.17 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 11,230.00
B. BAHAN
Pipa PVC m' 1.200 8,750.00 10,500.00
JUMLAH HARGA BAHAN 10,500.00

C. PERALATAN % 10.00% 8,750.00 875.00


JUMLAH HARGA ALAT 875.00

D. Jumlah (A + B + C) 22,605.00
E. Overhead & Profit 30% x D 6,781.50
F. Harga Satuan Pekerjaan (D+E) 29,386.50

9 5.1.1.9 1 M' Pas. Pipa PVC Tipe AW 3/4"


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.036 102,500.00 3,690.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala Tukang L.03 OH 0.006 115,000.00 690.00
Mandor L.17 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 11,230.00
B. BAHAN
Pipa PVC m' 1.200 13,750.00 16,500.00
JUMLAH HARGA BAHAN 16,500.00

C. PERALATAN % 10.00% 13,750.00 1,375.00


JUMLAH HARGA ALAT 1,375.00

D. Jumlah (A + B + C) 29,105.00
E. Overhead & Profit 30% x D 8,731.50
F. Harga Satuan Pekerjaan (D+E) 37,836.50
10 5.1.1.10 1 M' Pas. Pipa PVC Tipe AW 1"
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.036 102,500.00 3,690.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala Tukang L.03 OH 0.006 115,000.00 690.00
Mandor L.17 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 11,230.00
B. BAHAN
Pipa PVC m' 1.200 20,000.00 24,000.00
JUMLAH HARGA BAHAN 24,000.00

C. PERALATAN % 30.00% 20,000.00 6,000.00


JUMLAH HARGA ALAT 6,000.00

D. Jumlah (A + B + C) 41,230.00
E. Overhead & Profit 30% x D 12,369.00
F. Harga Satuan Pekerjaan (D+E) 53,599.00

10 5.1.1.10 1 M' Pas. Pipa PVC Tipe AW 1 1/4"


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.036 102,500.00 3,690.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala Tukang L.03 OH 0.006 115,000.00 690.00
Mandor L.17 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 11,230.00
B. BAHAN
Pipa PVC m' 1.200 21,250.00 25,500.00
JUMLAH HARGA BAHAN 25,500.00

C. PERALATAN % 30.00% 21,250.00 6,375.00


JUMLAH HARGA ALAT 6,375.00

D. Jumlah (A + B + C) 43,105.00
E. Overhead & Profit 30% x D 12,931.50
F. Harga Satuan Pekerjaan (D+E) 56,036.50

11 5.1.1.11 1 M' Pas. Pipa PVC Tipe AW 3"


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0810 102,500.00 8,302.50
Tukang batu L.02 OH 0.1350 110,000.00 14,850.00
Kepala Tukang L.03 OH 0.0135 115,000.00 1,552.50
Mandor L.17 OH 0.0040 125,000.00 500.00
JUMLAH TENAGA KERJA 25,205.00
B. BAHAN
Pipa PVC m' 1.200 52,684.50 63,221.40
JUMLAH HARGA BAHAN 63,221.40

C. PERALATAN % 30.00% 52,684.50 15,805.35


JUMLAH HARGA ALAT 15,805.35

D. Jumlah (A + B + C) 104,231.75
E. Overhead & Profit 30% x D 31,269.52
F. Harga Satuan Pekerjaan (D+E) 135,501.28

12 5.1.1.12 1 M' PAS. PIPA PVC TIPE AW 4"


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0810 102,500.00 8,302.50
Tukang batu L.02 OH 0.1350 110,000.00 14,850.00
Kepala Tukang L.03 OH 0.0135 115,000.00 1,552.50
Mandor L.17 OH 0.0040 125,000.00 500.00
JUMLAH TENAGA KERJA 25,205.00
B. BAHAN
Pipa PVC m' 1.200 87,289.25 104,747.10
JUMLAH HARGA BAHAN 104,747.10

C. PERALATAN % 30.00% 87,289.25 26,186.77


JUMLAH HARGA ALAT 26,186.77

D. Jumlah (A + B + C) 156,138.88
E. Overhead & Profit 30% x D 46,841.66
F. Harga Satuan Pekerjaan (D+E) 202,980.54
XIII 4.7.1 PEKERJAAN PENGECATAN
1 4.7.1.1 Pengecatan 1 M² tembok eksterior
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0280 102,500.00 2,870.00
Tukang cat L.06 OH 0.0420 110,000.00 4,620.00
Kepala tukang L.07 OH 0.0042 115,000.00 483.00
Mandor L.17 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 23,000.00
B. BAHAN
cat wellproof Kg 0.1000 18,000.00 4,260.00
Cat dasar Kg 0.1000 24,000.00 4,600.00
Cat aqua proff Kg 0.2600 32,000.00 8,400.00
amplas Kg 0.2600 37,000.00 4,000.00
JUMLAH HARGA BAHAN 21,260.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 44,260.00
E. Overhead & Profit 10% x D 4,426.00
F. Harga Satuan Pekerjaan (D+E) 48,686.00

2 4.7.1.2 cat interior


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.020 102,500.00 2,050.00
Tukang cat L.06 OH 0.063 110,000.00 6,930.00
Kepala tukang L.07 OH 0.0063 115,000.00 724.50
Mandor L.17 OH 0.003 125,000.00 375.00
JUMLAH TENAGA KERJA 22,000.00
B. BAHAN
cat interior Kg 0.100 18,000.00 6,200.00
Cat dasar Kg 0.100 24,000.00 4,600.00
wellporrf Kg 0.260 37,000.00 4,260.00
amplas Kg 0.2600 50,000.00 4,000.00
JUMLAH HARGA BAHAN 19,060.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 41,060.00
E. Overhead & Profit 15% x D 6,159.00
F. Harga Satuan Pekerjaan (D+E) 47,219.00

3 4.7.1.3 Pelaburan 1 m2 bidang kayu dengan politur


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0400 102,500.00 4,100.00
Tukang Cat L.06 OH 0.0600 110,000.00 6,600.00
Kepala Tukang L.07 OH 0.0160 115,000.00 1,840.00
Mandor L.17 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 12,915.00
B. BAHAN
politur L 0.1500 80,000.00 12,000.00
politur jadi L 0.3720 80,000.00 29,760.00
ampelas Lbr 2.0000 10,000.00 20,000.00
JUMLAH HARGA BAHAN 61,760.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 74,675.00
E. Overhead & Profit 15% x D 11,201.25
F. Harga Satuan Pekerjaan (D+E) 85,876.25
4 4.7.1.4 1 M2 Pek.Bidang kayu baru (1 plamir, 1 lapis cat dasar, 2 lapis cat penutup)
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0700 102,500.00 7,175.00
Tukang cat L.06 OH 0.0090 110,000.00 990.00
Kepala tukang L.07 OH 0.0060 115,000.00 690.00
Mandor L.17 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 9,230.00
B. BAHAN
Cat Menie kg 0.2000 45,000.00 9,000.00
Plamuur kg 0.1500 45,000.00 6,750.00
Cat Dasar kg 0.1700 50,000.00 8,500.00
Cat Penutup kg 0.2600 55,000.00 14,300.00
Minyak cat kg 0.0300 20,000.00 600.00
Amplas lbr 0.2000 10,000.00 2,000.00
Kuas bh 0.0100 18,000.00 180.00
JUMLAH HARGA BAHAN 41,330.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 50,560.00
E. Overhead & Profit 15% x D 7,584.00
F. Harga Satuan Pekerjaan (D+E) 58,144.00
XII 4.6.2 PEKERJAAN KUNCI DAN KACA
1 4.6.2.1 1 Bh Pasang Kunci Pintu Double Handle Komplit
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH 0.5000 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.0500 115,000.00 5,750.00
Mandor L.04 OH
JUMLAH TENAGA KERJA 60,750.00
B. BAHAN
Kunci Tanam Biasa bh 1.0000 800,000.00 800,000.00
JUMLAH HARGA BAHAN 800,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 860,750.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 860,750.00

2 4.6.2.2 1 Bh Pasang Kunci Pintu Handle Komplit


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH 0.5000 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.0500 115,000.00 5,750.00
Mandor L.04 OH
JUMLAH TENAGA KERJA 60,750.00
B. BAHAN
Kunci Tanam Biasa bh 1.0000 475,000.00 475,000.00
JUMLAH HARGA BAHAN 475,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 535,750.00
E. Overhead & Profit 15% x D 80,362.50
F. Harga Satuan Pekerjaan (D+E) 616,112.50

3 4.6.2.3 1 Bh Pasang Kunci Pintu Sleding Handle Komplit


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH 0.5000 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.0500 115,000.00 5,750.00
Mandor L.04 OH
JUMLAH TENAGA KERJA 60,750.00
B. BAHAN
Kunci Sleding Handle Komplit bh 1.0000 400,000.00 400,000.00
JUMLAH HARGA BAHAN 400,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 460,750.00
E. Overhead & Profit 15% x D 69,112.50
F. Harga Satuan Pekerjaan (D+E) 529,862.50
4 4.6.2.4 1 Bh Pasang Espagnolet
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH 0.5000 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.0500 115,000.00 5,750.00
Mandor L.04 OH
JUMLAH TENAGA KERJA 60,750.00
B. BAHAN
Espagnolet bh 1.0000 225,000.00 225,000.00
JUMLAH HARGA BAHAN 225,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 285,750.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 285,750.00

5 4.6.2.5 1 Pasang Engsel Pintu


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH 0.1250 110,000.00 13,750.00
Kepala Tukang L.03 OH 0.0130 115,000.00 1,495.00
Mandor L.04 OH
JUMLAH TENAGA KERJA 15,245.00
B. BAHAN
Engsel Pintu ps 1.0000 60,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 75,245.00
E. Overhead & Profit 15% x D 11,286.75
F. Harga Satuan Pekerjaan (D+E) 86,531.75

6 4.6.2.6 1 Pasang Engsel Jendela


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0010 115,000.00 115.00
Mandor L.04 OH
JUMLAH TENAGA KERJA 11,115.00
B. BAHAN
Engsel Jendela ps 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 50,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 61,115.00
E. Overhead & Profit 15% x D 9,167.25
F. Harga Satuan Pekerjaan (D+E) 70,282.25
7 4.6.2.7 1 Pasang Kait Angin
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0010 115,000.00 115.00
Mandor L.04 OH
JUMLAH TENAGA KERJA 11,115.00
B. BAHAN
Kait Angin ps 1.0000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 56,115.00
E. Overhead & Profit 15% x D 8,417.25
F. Harga Satuan Pekerjaan (D+E) 64,532.25

8 4.6.2.8 1 Bh Grendel Pintu


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0010 115,000.00 115.00
Mandor L.04 OH
JUMLAH TENAGA KERJA 11,115.00
B. BAHAN
Grendel pintu ps 1.0000 65,000.00 65,000.00
JUMLAH HARGA BAHAN 65,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 76,115.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 76,115.00

9 4.6.2.9 1 Bh Pasang Grendel Jendela


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH 0.0500 110,000.00 5,500.00
Kepala Tukang L.03 OH 0.0010 115,000.00 115.00
Mandor L.04 OH
JUMLAH TENAGA KERJA 5,615.00
B. BAHAN
Grendel jendela ps 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 50,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 55,615.00
E. Overhead & Profit 15% x D 8,342.25
F. Harga Satuan Pekerjaan (D+E) 63,957.25
10 4.6.2.10 1 Bh Pasang Rel Pintu Sleding
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN KODE SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH
Tukang Kayu L.02 OH 0.5000 110,000.00 55,000.00
Kepala Tukang L.03 OH 0.0500 115,000.00 5,750.00
Mandor L.04 OH
JUMLAH TENAGA KERJA 60,750.00
B. BAHAN
Rel Pintu Sleding bh 1.0000 350,000.00 350,000.00
JUMLAH HARGA BAHAN 350,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 410,750.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 410,750.00

11 4.6.2.11 Pemasangan 1 m² kaca tebal 3 mm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0150 102,500.00 1,537.50
Tukang kayu L.04 OH 0.1500 110,000.00 16,500.00
Kepala Tukang L.05 OH 0.0150 115,000.00 1,725.00
Mandor L.17 OH 0.0008 125,000.00 100.00
JUMLAH TENAGA KERJA 19,862.50
B. BAHAN
Kaca tebal 3 mm bening m2 1.1000 130,000.00 143,000.00
Sealant Kg 0.0500 45,000.00 2,250.00
JUMLAH HARGA BAHAN 145,250.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 165,112.50
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 165,112.50

12 4.6.2.12 Pemasangan 1 m² kaca tebal 8 mm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0150 102,500.00 1,537.50
Tukang kayu L.04 OH 0.1500 110,000.00 16,500.00
Kepala Tukang L.05 OH 0.0150 115,000.00 1,725.00
Mandor L.17 OH 0.0008 125,000.00 100.00
JUMLAH TENAGA KERJA 19,862.50
B. BAHAN
Kaca tebal 8 mm Bening m2 1.1000 315,000.00 346,500.00
Sealant Kg 0.0500 45,000.00 2,250.00
JUMLAH HARGA BAHAN 348,750.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 368,612.50
E. Overhead & Profit 15% x D 55,291.88
F. Harga Satuan Pekerjaan (D+E) 423,904.38
XI 4.6.1 PEKERJAAN KAYU
1 4.6.1.1 Pembuatan dan pemasangan 1 M3 Kusen Kamper pintu dan jendela kayu Bingkerai
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 7.0000 102,500.00 717,500.00
Tukang kayu L.04 OH 21.0000 110,000.00 2,310,000.00
Kepala Tukang L.05 OH 2.1000 115,000.00 241,500.00
Mandor L.17 OH 0.3500 125,000.00 43,750.00
JUMLAH TENAGA KERJA 3,312,750.00
B. BAHAN
Balok Kayu Bingkerai M³ 1.1000 13,000,000.00 14,300,000.00
Paku usuk Kg 1.2500 20,000.00 25,000.00
Lem kayu Kg 1.0000 17,000.00 17,000.00
JUMLAH HARGA BAHAN 14,342,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 17,654,750.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 17,654,750.00

2 4.6.1.2 Pembuatan dan pemasangan 1 M3 Kusen Kruing pintu dan jendela kayu kruwing
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 6.0000 102,500.00 615,000.00
Tukang kayu L.04 OH 18.0000 110,000.00 1,980,000.00
Kepala Tukang L.05 OH 1.8000 115,000.00 207,000.00
Mandor L.17 OH 0.3000 125,000.00 37,500.00
JUMLAH TENAGA KERJA 2,839,500.00
B. BAHAN
Balok Kayu Kruwing M³ 1.2000 6,750,000.00 8,100,000.00
Paku usuk Kg 1.2500 20,000.00 25,000.00
Lem kayu Kg 1.0000 17,000.00 17,000.00
JUMLAH HARGA BAHAN 8,142,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 10,981,500.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 10,981,500.00

3 4.6.1.3 Pembuatan dan pemasangan 1 M3 Kusen dan jendela jati


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 7.0000 102,500.00 717,500.00
Tukang kayu L.04 OH 21.0000 110,000.00 2,310,000.00
Kepala Tukang L.05 OH 2.1000 115,000.00 241,500.00
Mandor L.17 OH 0.3500 125,000.00 43,750.00
JUMLAH TENAGA KERJA 3,312,750.00
B. BAHAN
kayu jati balok M³ 1.1000 9,500,000.00 10,450,000.00
Paku usuk Kg 1.2500 20,000.00 25,000.00
Lem kayu Kg 1.0000 17,000.00 17,000.00
JUMLAH HARGA BAHAN 10,492,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 13,804,750.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 13,804,750.00
4 4.6.1.4 1 m2 Daun Jendela Kaca 3 mm,Kayu kruwing
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.8000 102,500.00 82,000.00
Tukang kayu L.04 OH 2.4000 110,000.00 264,000.00
Kepala Tukang L.05 OH 0.2400 115,000.00 27,600.00
Mandor L.17 OH 0.0400 125,000.00 5,000.00
JUMLAH TENAGA KERJA 378,600.00
B. BAHAN
Papan kayu kruing M³ 0.0240 7,450,000.00 178,800.00
kaca bening 3 mm m2 0.8000 130,000.00 104,000.00
Lem kayu Kg 0.1000 17,000.00 1,700.00
JUMLAH HARGA BAHAN 284,500.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 663,100.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 663,100.00

5 4.6.1.5 Pembuatan dan pemasangan 1 m² rangka pintu dan jendela kaca, kayu kamper
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.8000 102,500.00 82,000.00
Tukang kayu L.04 OH 2.4000 110,000.00 264,000.00
Kepala Tukang L.05 OH 0.2400 115,000.00 27,600.00
Mandor L.17 OH 0.0400 125,000.00 5,000.00
JUMLAH TENAGA KERJA 378,600.00
B. BAHAN
Papan kayu kamper M³ 0.0240 8,000,000.00 192,000.00
Lem kayu Kg 0.3000 17,000.00 5,100.00
JUMLAH HARGA BAHAN 197,100.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 575,700.00
E. Overhead & Profit 15% x D 86,355.00
F. Harga Satuan Pekerjaan (D+E) 662,055.00

6 4.6.1.6 Pembuatan dan pemasangan 1 m² pintu panil, kayu Bingkerai


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.0000 102,500.00 102,500.00
Tukang kayu L.04 OH 3.0000 110,000.00 330,000.00
Kepala Tukang L.05 OH 0.3000 115,000.00 34,500.00
Mandor L.17 OH 0.0500 125,000.00 6,250.00
JUMLAH TENAGA KERJA 473,250.00
B. BAHAN
Papan kayu Bingkerai M³ 0.0400 13,000,000.00 520,000.00
Lem kayu Kg 0.5000 17,000.00 8,500.00
JUMLAH HARGA BAHAN 528,500.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,001,750.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 1,001,750.00
7 4.6.1.7 Pembuatan 1 M2 daun pintu plywood rangkap,rangka kayu kamper tertutup ( lebar sampai 90 cm)
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.7000 102,500.00 71,750.00
Tukang kayu L.04 OH 2.1000 110,000.00 231,000.00
Kepala Tukang L.05 OH 0.2100 115,000.00 24,150.00
Mandor L.17 OH 0.0350 125,000.00 4,375.00
JUMLAH TENAGA KERJA 331,275.00
B. BAHAN
Papan Kayu Kamper m3 0.0250 8,000,000.00 200,000.00
Paku 1 - 2,5 cm kg 0.0300 20,000.00 600.00
Playwood tebal 4 mm lembar 1.0000 60,000.00 60,000.00
Lem kayu Kg 0.5000 17,000.00 8,500.00
JUMLAH HARGA BAHAN 269,100.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 600,375.00
E. Overhead & Profit 15% x D 90,056.25
F. Harga Satuan Pekerjaan (D+E) 690,431.25

8 4.6.1.8 Pemasangan 1 m' list plank ukuran (3x20) cm , kayu kamper


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 102,500.00 10,250.00
Tukang kayu L.04 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.05 OH 0.0200 115,000.00 2,300.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 35,175.00
B. BAHAN
Papan kayu Kamper 3/20 M³ 0.0108 8,000,000.00 86,400.00
Paku usuk Kg 0.1000 20,000.00 2,000.00
JUMLAH HARGA BAHAN 88,400.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 123,575.00
E. Overhead & Profit 15% x D 18,536.25
F. Harga Satuan Pekerjaan (D+E) 142,111.25
X 4.5.2 PEKERJAAN PENUTUP ATAP
1 4.5.2.1 Pemasangan 1 m2 Atap Kodok Sejati
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1500 102,500.00 15,375.00
Tukang Kayu L.04 OH 0.0750 110,000.00 8,250.00
Kepala Tukang L.05 OH 0.0080 115,000.00 920.00
Mandor L.17 OH 0.0080 125,000.00 1,000.00
JUMLAH TENAGA KERJA 25,545.00
B. BAHAN
Genteng Kodok Sejati bh 25.0000 3,500.00 87,500.00
JUMLAH HARGA BAHAN 87,500.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 113,045.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 113,045.00

2 4.5.2.2 Pemasangan 1 m' Bubungan Kodok Sejati


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.4000 102,500.00 41,000.00
Tukang kayu L.04 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.05 OH 0.0200 115,000.00 2,300.00
Mandor L.17 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 65,550.00
B. BAHAN
Bubungan Genteng Sejati Bh 5.0000 3,500.00 17,500.00
Semen Portland Kg 8.0000 1,300.00 10,400.00
Pasir pasang M³ 0.0320 150,000.00 4,800.00
JUMLAH HARGA BAHAN 32,700.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 98,250.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 98,250.00

3 4.5.2.3 1 M2 Pasang Seng Spandek


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.04 OH 0.0600 102,500.00 6,150.00
Tukang kayu L.05 OH 0.0060 110,000.00 660.00
Kepala Tukang L.01 OH 0.1200 115,000.00 13,800.00
Mandor L.17 OH 0.0060 125,000.00 750.00
JUMLAH TENAGA KERJA 21,360.00
B. BAHAN
Zincalume / spandeck 0,25 mm m1 1.3750 50,500.00 69,437.50
Paku sekrup 1/2" kg 0.1000 80,000.00 8,000.00
JUMLAH HARGA BAHAN 77,437.50

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 98,797.50
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 98,797.50
4 4.5.2.4 Pek. 10 M' Bubungan Atap Seng
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Tukang Besi L.08 OH 0.2500 110,000.00 27,500.00
Kepala Tukang L.09 OH 0.0250 115,000.00 2,875.00
Pekerja L.01 OH 0.2500 102,500.00 25,625.00
Mandor L.17 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 56,250.00
B. BAHAN
Seng Talang 30 cm m' 6.0000 20,000.00 120,000.00
Paku sekrup 1/2" kotak 12.0000 80,000.00 960,000.00
JUMLAH HARGA BAHAN 1,080,000.00

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 1,136,250.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 1,136,250.00
1 M' 113,625.00

5 4.5.2.5 Pek. 1 Bh Pasangan Murda Paras


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.08 OH 0.4000 102,500.00 41,000.00
Tukang kayu L.09 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.01 OH 0.0200 115,000.00 2,300.00
Mandor L.17 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 65,550.00
B. BAHAN
Murda Paras bh 1.0000 150,000.00 150,000.00
Semen kg 10.8000 1,300.00 14,040.00
Pasir Pasang m3 0.0320 150,000.00 4,800.00
JUMLAH HARGA BAHAN 168,840.00

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 234,390.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 234,390.00

6 4.5.2.6 Pek. 1 Bh Pasangan Ikut Celedu Paras


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.08 OH 0.4000 102,500.00 41,000.00
Tukang kayu L.09 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.01 OH 0.0200 115,000.00 2,300.00
Mandor L.17 OH 0.0020 125,000.00 250.00
JUMLAH TENAGA KERJA 65,550.00
B. BAHAN
Ikut Celedu Paras bh 1.0000 150,000.00 150,000.00
Semen kg 10.8000 1,300.00 14,040.00
Pasir Pasang m3 0.0320 150,000.00 4,800.00
JUMLAH HARGA BAHAN 168,840.00

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 234,390.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 234,390.00
IX 4.5.1 PEKERJAAN PLAFON
1 4.5.1.1 Pemasangan 1 m² langit-langit gypsum board ukuran (120 x 240 x 9) mm,(tanpa Rangka)
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 102,500.00 10,250.00
Tukang kayu L.04 OH 0.0500 110,000.00 5,500.00
Kepala Tukang L.05 OH 0.0050 115,000.00 575.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 16,950.00
B. BAHAN
Gypsum board Lembar 0.3640 50,000.00 18,200.00
Paku skrup 1/2" Kg 0.1100 80,000.00 8,800.00
JUMLAH HARGA BAHAN 27,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 43,950.00
E. Overhead & Profit 15% x D 6,592.50
F. Harga Satuan Pekerjaan (D+E) 50,542.50

2 4.5.1.2 Pemasangan 1 m² langit-langit Kalsiboard ukuran (120 x 240 x 3) mm,(tanpa Rangka)


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 102,500.00 10,250.00
Tukang kayu L.04 OH 0.0500 110,000.00 5,500.00
Kepala Tukang L.05 OH 0.0050 115,000.00 575.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 16,950.00
B. BAHAN
Kalsiboard Lembar 0.3640 67,000.00 24,388.00
Paku skrup 1/2" Kg 0.1100 80,000.00 8,800.00
JUMLAH HARGA BAHAN 33,188.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 50,138.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 50,138.00

3 4.5.1.3 Pemasangan 1 m' list gypsum


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0300 102,500.00 3,075.00
Tukang kayu L.04 OH 0.0300 110,000.00 3,300.00
Kepala Tukang L.05 OH 0.0030 115,000.00 345.00
Mandor L.17 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 7,095.00
B. BAHAN
List gypsum m 1.0500 5,000.00 5,250.00
Compound/dempul Kg 0.0100 55,000.00 550.00
JUMLAH HARGA BAHAN 5,800.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,895.00
E. Overhead & Profit 15% x D 1,934.25
F. Harga Satuan Pekerjaan (D+E) 14,829.25
4 4.5.1.4 1 m' pasangan list langit-langit kayu profil
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0500 102,500.00 5,125.00
Tukang kayu L.04 OH 0.0500 110,000.00 5,500.00
Kepala Tukang L.05 OH 0.0050 115,000.00 575.00
Mandor L.17 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 11,575.00
B. BAHAN
list kayu 2/4 m' 1.0500 6,250.00 6,562.50
Paku list Kg 0.0100 20,000.00 200.00
JUMLAH HARGA BAHAN 6,762.50

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 18,337.50
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 18,337.50

5 4.5.1.5 Pemasangan 1 m² rangka besi hollow 1x40.40.4 m, Untuk Plafond


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1500 102,500.00 15,375.00
Tukang Kayu L.04 OH 0.1500 110,000.00 16,500.00
Kepala Tukang L.05 OH 0.1500 115,000.00 17,250.00
Mandor L.17 OH 0.0180 125,000.00 2,250.00
JUMLAH TENAGA KERJA 51,375.00
B. BAHAN
Rangka metal hollow 40.40.4 mm m' 4.0000 750.00 3,000.00
Assesories (perkuatan, las dll) Ls 10% x rangka 75.00 75.00
JUMLAH HARGA BAHAN 3,075.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 54,450.00
E. Overhead & Profit 15% x D 8,167.50
F. Harga Satuan Pekerjaan (D+E) 62,617.50

6 4.5.1.6 Pemasangan 1 m² Dinding partisi gypsum rangka hollow


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 102,500.00 30,750.00
Tukang Kayu L.04 OH 0.3500 110,000.00 38,500.00
Kepala Tukang L.05 OH 0.1500 115,000.00 17,250.00
Mandor L.17 OH 0.0180 125,000.00 2,250.00
JUMLAH TENAGA KERJA 88,750.00
B. BAHAN
Rangka metal hollow 40.40.4 mm m' 4.0000 750.00 3,000.00
Assesories (perkuatan, las dll) Ls 100% x rangka 750.00 750.00
Gypsum board 0.3640 50,000.00 18,200.00
Paku skrup 1/2" 0.1100 80,000.00 8,800.00
JUMLAH HARGA BAHAN 30,750.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 119,500.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 119,500.00
VIII 4.4.3 PEKERJAAN PASANGAN PENUTUP LANTAI DAN PENUTUP DINDING
1 4.4.3.1 Pemasangan 1 m² lantai keramik ukuran 30 cm x30 cm KW 1
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.7000 102,500.00 71,750.00
Tukang batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala Tukang L.03 OH 0.0350 115,000.00 4,025.00
Mandor L.17 OH 0.0350 125,000.00 4,375.00
JUMLAH TENAGA KERJA 118,650.00
B. BAHAN
Kramik 30 x 30 cm bh 11.8000 5,000.00 59,000.00
Semen Portland Kg 10.0000 1,300.00 13,000.00
Pasir pasang M³ 0.0450 150,000.00 6,750.00
Semen warna Kg 1.5000 17,000.00 25,500.00
JUMLAH HARGA BAHAN 104,250.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 222,900.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 222,900.00

2 4.4.3.2 Pemasangan 1 m² lantai keramik ukuran 40 cm x 40 cm kw 1


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.4000 102,500.00 41,000.00
Tukang batu L.02 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.0300 115,000.00 3,450.00
Mandor L.17 OH 0.0300 125,000.00 3,750.00
JUMLAH TENAGA KERJA 70,200.00
B. BAHAN
Kramik 40 x 40 cm bh 6.6300 9,166.67 60,775.00
Semen Portland Kg 9.8000 1,300.00 12,740.00
Pasir pasang M³ 0.0450 150,000.00 6,750.00
Semen warna Kg 1.3000 17,000.00 22,100.00
JUMLAH HARGA BAHAN 102,365.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 172,565.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 172,565.00

3 4.4.3.3 Pemasangan 1 m plint ubin uk. 10x30 cm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0900 102,500.00 9,225.00
Tukang batu L.02 OH 0.0900 110,000.00 9,900.00
Kepala Tukang L.03 OH 0.0090 115,000.00 1,035.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 20,785.00
B. BAHAN
Kramik 10 x 30 cm bh 3.5300 1,666.67 5,883.33
Semen Portland Kg 1.1400 1,300.00 1,482.00
Pasir pasang M³ 0.0030 150,000.00 450.00
Semen warna Kg 0.1000 17,000.00 1,700.00
JUMLAH HARGA BAHAN 9,515.33

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 30,300.33
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 30,300.33
4 4.4.3.4 Pemasangan 1 m plint Keramik Asia Tile uk. 10x40 cm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0900 102,500.00 9,225.00
Tukang batu L.02 OH 0.0900 110,000.00 9,900.00
Kepala Tukang L.03 OH 0.0090 115,000.00 1,035.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 20,785.00
B. BAHAN
Kramik 10 x 40 cm bh 2.6500 2,291.67 6,072.92
Semen Portland Kg 1.1400 1,300.00 1,482.00
Pasir pasang M³ 0.0030 150,000.00 450.00
Semen warna Kg 0.1000 17,000.00 1,700.00
JUMLAH HARGA BAHAN 9,704.92

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 30,489.92
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 30,489.92

5 4.4.3.5 Pemasangan 1 m² Dinding keramik ukuran 25 cm x 40 cm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6000 102,500.00 61,500.00
Tukang batu L.02 OH 0.3000 115,000.00 34,500.00
Kepala Tukang L.03 OH 0.0450 115,000.00 5,175.00
Mandor L.17 OH 0.0450 125,000.00 5,625.00
JUMLAH TENAGA KERJA 106,800.00
B. BAHAN
Kramik 25 x 40 cm bh 11.0000 5,500.00 60,500.00
Semen Portland Kg 9.3000 1,300.00 12,090.00
Pasir pasang M³ 0.0180 150,000.00 2,700.00
Semen warna Kg 1.3000 17,000.00 22,100.00
JUMLAH HARGA BAHAN 97,390.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 204,190.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 204,190.00

5 4.4.3.5 Pemasangan 1 m² Dinding Granito ukuran 60 cm x 60 cm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6000 125,000.00 75,000.00
Tukang batu L.02 OH 0.3000 130,000.00 39,000.00
Kepala Tukang L.03 OH 0.0450 170,000.00 7,650.00
Mandor L.17 OH 0.0450 300,000.00 13,500.00
JUMLAH TENAGA KERJA 135,150.00
B. BAHAN
Granit 60/60 cm Bh 2.8611 Rp 41,400.00 118,450.00
Semen MU 420 Kg 8.5000 4,060.00 34,510.00
Pasir pasang M³ - 285,714.00 -
Semen warna Kg 1.3000 17,000.00 22,100.00
JUMLAH HARGA BAHAN 175,060.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 310,210.00
E. Overhead & Profit 10% x D 31,021.00
F. Harga Satuan Pekerjaan (D+E) 341,231.00
6 4.4.3.6 Pemasangan 1 m² Ubin Pemandu ukuran 30 cm x30 cm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.2700 102,500.00 27,675.00
Tukang batu L.02 OH 0.1350 110,000.00 14,850.00
Kepala Tukang L.03 OH 0.0140 115,000.00 1,610.00
Mandor L.17 OH 0.0140 125,000.00 1,750.00
JUMLAH TENAGA KERJA 45,885.00
B. BAHAN
Ubin Pemandu 30 x 30 cm bh 11.8000 16,363.64 193,090.91
Semen Portland Kg 10.0000 1,300.00 13,000.00
Pasir pasang M³ 0.0450 150,000.00 6,750.00
Semen warna Kg 1.5000 17,000.00 25,500.00
JUMLAH HARGA BAHAN 238,340.91

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 284,225.91
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 284,225.91
VII 4.4.2 PEKERJAAN PLESTERAN
1 4.4.2.1 Pemasangan 1 m² Plesteran 1 SP : 5 PP tebal 15 mm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 102,500.00 30,750.00
Tukang batu L.02 OH 0.1500 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.0150 115,000.00 1,725.00
Mandor L.17 OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 40,000.00
B. BAHAN
Semen Portland kg 5.1840 1,300.00 6,739.20
Pasir Pasang m³ 0.0260 150,000.00 3,900.00
JUMLAH HARGA BAHAN 10,639.20
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 50,639.20
E. Overhead & Profit 15% x D 7,595.88
F. Harga Satuan Pekerjaan (D+E) 58,235.08

2 4.4.2.2 Pemasangan 1 m² acian


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.2000 102,500.00 20,500.00
Tukang batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 115,000.00 1,150.00
Mandor L.17 OH 0.0100 125,000.00 1,250.00
JUMLAH TENAGA KERJA 33,900.00
B. BAHAN
Semen Portland Kg 3.2500 1,300.00 4,225.00
JUMLAH HARGA BAHAN 4,225.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 38,125.00
E. Overhead & Profit 20% x D 7,625.00
F. Harga Satuan Pekerjaan (D+E) 45,750.00

3 4.4.2.3 Pekerjaan Pemasangan Bata Press Tulikup tanpa nat


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Tukang Style Bali L.12 OH 0.8803 120,000.00 105,633.74
Kepala Tukang Style Bali L.24 OH 0.2000 115,000.00 23,000.00
Pekerja L.01 OH 0.2000 102,500.00 20,500.00
Mandor L.17 OH 0.0100 125,000.00 1,250.00
JUMLAH TENAGA KERJA 150,383.74
B. BAHAN
Bata Gosok Kelas I Bj 75.0000 6,000.00 450,000.00
Semen Portland Kg 30.0000 1,300.00 39,000.00
JUMLAH HARGA BAHAN 489,000.00

C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 639,383.74
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 639,383.74
VI 4.4.1 PEKERJAAN DINDING PASANGAN
1 4.4.1.1 Pemasangan 1 m2 Batako 1 : 5 cetak buntu
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3200 102,500.00 32,800.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 115,000.00 1,150.00
Mandor L.17 OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 46,825.00
B. BAHAN
Batako Bh 12.500 2,800.00 35,000.00
Semen Portland Kg 7.500 1,300.00 9,750.00
Pasir pasang M3 0.027 150,000.00 4,050.00
JUMLAH HARGA BAHAN 48,800.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 95,625.00
E. Overhead & Profit 17% x D 16,256.25
F. Harga Satuan Pekerjaan (D+E) 111,881.25

2 4.4.1.2 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 3 PP


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 102,500.00 30,750.00
Tukang batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 115,000.00 1,150.00
Mandor L.17 OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 44,775.00
B. BAHAN
Bata merah biji 70.0000 800.00 56,000.00
Semen Portland kg 14.3700 1,300.00 18,681.00
Pasir pasang m³ 0.0400 150,000.00 6,000.00
JUMLAH HARGA BAHAN 80,681.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 125,456.00
E. Overhead & Profit 30% x D 37,636.80
F. Harga Satuan Pekerjaan (D+E) 163,092.80

3 4.4.1.3 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 4 PP


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 102,500.00 30,750.00
Tukang batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 115,000.00 1,150.00
Mandor L.17 OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 44,775.00
B. BAHAN
Bata merah biji 70.0000 800.00 56,000.00
Semen Portland kg 11.5000 1,300.00 14,950.00
Pasir pasang m³ 0.0430 285,714.00 12,285.70
JUMLAH HARGA BAHAN 83,235.70
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 128,010.70
E. Overhead & Profit 30% x D 38,403.21
F. Harga Satuan Pekerjaan (D+E) 166,413.91
4 4.4.1.4 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 5 PP
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 102,500.00 30,750.00
Tukang batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 115,000.00 1,150.00
Mandor L.17 OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 44,775.00
B. BAHAN
Bata merah biji 70.0000 800.00 56,000.00
Semen Portland kg 9.6800 1,300.00 12,584.00
Pasir pasang m³ 0.0450 150,000.00 6,750.00
JUMLAH HARGA BAHAN 75,334.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 120,109.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 120,109.00
V 4.2.1 PEKERJAAN BESI DAN ALUMINIUM
1 4.2.1.1 1 M2 Pek. Kap. Baja Ringan Profil C
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Upah Pasang Ls 1.0000 25,000.00 25,000.00
JUMLAH TENAGA KERJA 25,000.00
B. BAHAN
Baja Ringan Type C- 75, 0.75 m' 3.720 21,666.67 80,600.00
Skrup SDS 8 x 16 bh 28.000 200.00 5,600.00
Dynabolt bh 1.600 4,000.00 6,400.00
Reng AA 0,45 m' 5.400 8,333.33 45,000.00
JUMLAH HARGA BAHAN 137,600.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 162,600.00
E. Overhead & Profit 30% x D 48,780.00
F. Harga Satuan Pekerjaan (D+E) 211,380.00

2 4.2.1.2 1 M1 Pek. Kap. Baja Ringan Profil U


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Upah Pasang Ls 1.0000 30,000.00 30,000.00
JUMLAH TENAGA KERJA 30,000.00
B. BAHAN
UK-75-75 m1 2.1200 29,166.67 61,833.33
UK-75-55 m1 2.2100 27,500.00 60,775.00
UK-65-55 m1 6.6000 25,833.33 170,500.00
Reng AA 0,45 m2 1.0000 8,333.33 8,333.33
Skrup SDS 8 x 16 Bh 12.7273 200.00 2,545.46
Skrup SDS 12 x 20 Bh 27.2727 300.00 8,181.81
Skrup SDS 10 x 16 Bh 13.6364 300.00 4,090.92
Dynabol 10 x 65 Bh 0.5455 2,500.00 1,363.75
Diafrakma (PLD) Bh 8.8636 3,000.00 26,590.80
Sepatu UK (PK) Bh 0.2727 5,000.00 1,363.50
JUMLAH HARGA BAHAN 345,577.91

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 375,577.91
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 375,577.91
IV 4.1.1 HARGA SATUAN PEKERJAAN BETON, BEKISTING DAN PEMBESIAN
Catatan : Bobot isi pasir = 1400kg/m3, Bobot isi Kerikil = 1350 kg/m3
1 4.1.1.1 Membuat 1 m3 beton mutu F'c=7,4 (K100), slump (12 ± 2) cm,w/c =0,87
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 102,500.00 169,125.00
Tukang Batu L.02 OH 0.2750 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.0280 115,000.00 3,220.00
Mandor L.17 OH 0.0830 125,000.00 10,375.00
JUMLAH TENAGA KERJA 212,970.00
B. BAHAN
Semen Portland Kg 247 1,300.00 321,100.00
Pasir Beton Kg 869 128.57 111,728.57
Kerikil (Maks 30mm) Kg 999 177.78 177,600.00
Air Liter 215 - -
JUMLAH HARGA BAHAN 610,428.57
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 823,398.57
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 823,398.57

2 4.1.1.2 Membuat 1 m3 beton mutu F'c=9,8(K125), slump (12 ± 2) cm,w/c =0,78


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 102,500.00 169,125.00
Tukang Batu L.02 OH 0.2750 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.0280 115,000.00 3,220.00
Mandor L.17 OH 0.0830 125,000.00 10,375.00
JUMLAH TENAGA KERJA 212,970.00
B. BAHAN
Semen Portland Kg 276 1,300.00 358,800.00
Pasir Beton Kg 828 128.57 106,457.14
Kerikil (Maks 30mm) Kg 1,012 177.78 179,911.11
Air Liter 215 - -
JUMLAH HARGA BAHAN 645,168.25
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 858,138.25
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 858,138.25

3 4.1.1.3 Membuat 1 m3 beton mutu F'c=12,2(K150), slump (12 ± 2) cm,w/c =0,72


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 102,500.00 169,125.00
Tukang Batu L.02 OH 0.2750 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.0280 115,000.00 3,220.00
Mandor L.17 OH 0.0830 125,000.00 10,375.00
JUMLAH TENAGA KERJA 212,970.00
B. BAHAN
Semen Portland Kg 299 1,300.00 388,700.00
Pasir Beton Kg 799 128.57 102,728.57
Kerikil (Maks 30mm) Kg 1,017 177.78 180,800.00
Air Liter 215 - -
JUMLAH HARGA BAHAN 672,228.57
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 885,198.57
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 885,198.57
4 4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), Slump (3-6)cm, w/c = 0,87
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.200 102,500.00 123,000.00
Tukang Batu L.02 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 115,000.00 2,300.00
Mandor L.17 OH 0.060 125,000.00 7,500.00
JUMLAH TENAGA KERJA 154,800.00
B. BAHAN
Semen Portland Kg 230 1,300.00 299,000.00
Pasir Beton Kg 893 128.57 114,814.29
Kerikil (Maks 30mm) Kg 1,027 177.78 182,577.78
Air Liter 200 - -
JUMLAH HARGA BAHAN 596,392.06
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 751,192.06
E. Overhead & Profit 30% x D 225,357.62
F. Harga Satuan Pekerjaan (D+E) 976,549.68

5 4.1.1.5 Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 102,500.00 169,125.00
Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.028 115,000.00 3,220.00
Mandor L.17 OH 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 212,970.00
B. BAHAN
Semen Portland Kg 326 1,300.00 423,800.00
Pasir Beton Kg 760 128.57 97,714.29
Kerikil (Maks 30mm) Kg 1,029 177.78 182,933.33
Air Liter 215 - -
JUMLAH HARGA BAHAN 704,447.62
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 917,417.62
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 917,417.62

6 4.1.1.6 Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 102,500.00 169,125.00
Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.028 115,000.00 3,220.00
Mandor L.17 OH 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 212,970.00
B. BAHAN
Semen Portland Kg 352 1,300.00 457,600.00
Pasir Beton Kg 731 128.57 93,985.71
Kerikil (Maks 30mm) Kg 1,031 177.78 183,288.89
Air Liter 215 - -
JUMLAH HARGA BAHAN 734,874.60
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 947,844.60
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 947,844.60
7 4.1.1.7 Membuat 1 m3 beton mutu f'c=19,3 Mpa(K 225),slump ( 12 ±2) cm, w/c = 0,58
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 102,500.00 169,125.00
Tukang Batu L.02 OH 0.2750 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.0280 115,000.00 3,220.00
Mandor L.17 OH 0.0830 125,000.00 10,375.00
JUMLAH TENAGA KERJA 212,970.00
B. BAHAN
Semen Portland Kg 371 1,300.00 482,300.00
Pasir Beton Kg 698 128.57 89,742.86
Kerikil (Maks 30mm) Kg 1,047 177.78 186,133.33
Air Liter 215 - -
JUMLAH HARGA BAHAN 758,176.19
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 971,146.19
E. Overhead & Profit 30% x D 291,343.86
F. Harga Satuan Pekerjaan (D+E) 1,262,490.05

8 4.1.1.8 Membuat 1 m3 beton mutu f'c=21,7 Mpa(K 250),slump ( 12 ±2) cm, w/c = 0,56
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 102,500.00 169,125.00
Tukang Batu L.02 OH 0.2750 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.0280 115,000.00 3,220.00
Mandor L.17 OH 0.0830 125,000.00 10,375.00
JUMLAH TENAGA KERJA 212,970.00
B. BAHAN
Semen Portland Kg 384 1,300.00 499,200.00
Pasir Beton Kg 692 128.57 88,971.43
Kerikil (Maks 30mm) Kg 1,039 177.78 184,711.11
Air Liter 215 200.00 43,000.00
JUMLAH HARGA BAHAN 815,882.54
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 1,028,852.54
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 1,028,852.54

9 4.1.1.9 Membuat 1 m3 beton mutu f'c=24,0 Mpa(K 275),slump ( 12 ±2) cm, w/c = 0,53
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 102,500.00 169,125.00
Tukang Batu L.02 OH 0.2750 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.0280 115,000.00 3,220.00
Mandor L.17 OH 0.0830 125,000.00 10,375.00
JUMLAH TENAGA KERJA 212,970.00
B. BAHAN
Semen Portland Kg 406 1,300.00 527,800.00
Pasir Beton Kg 684 128.57 87,942.86
Kerikil (Maks 30mm) Kg 1,026 177.78 182,400.00
Air Liter 215 - -
JUMLAH HARGA BAHAN 798,142.86
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 1,011,112.86
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 1,011,112.86
10 4.1.1.10 Membuat 1 m3 beton mutu f'c=26,4 Mpa(K 300),slump ( 12 ± 2) cm, w/c = 0,52
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.6500 102,500.00 169,125.00
Tukang Batu L.02 OH 0.2750 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.0280 115,000.00 3,220.00
Mandor L.17 OH 0.0830 125,000.00 10,375.00
JUMLAH TENAGA KERJA 212,970.00
B. BAHAN
Semen Portland Kg 413 1,300.00 536,900.00
Pasir Beton Kg 681 128.57 87,557.14
Kerikil (Maks 30mm) Kg 1,021 177.78 181,511.11
Air Liter 215 - -
JUMLAH HARGA BAHAN 805,968.25
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 1,018,938.25
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 1,018,938.25

11 4.1.1.11 Membuat 1 m3 beton mutu f'c=28,8 Mpa(K 325),slump ( 12 ± 2) cm, w/c = 0,49
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 2.1000 102,500.00 215,250.00
Tukang Batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala Tukang L.03 OH 0.0350 115,000.00 4,025.00
Mandor L.17 OH 0.1050 125,000.00 13,125.00
JUMLAH TENAGA KERJA 270,900.00
B. BAHAN
Semen Portland Kg 439 1,300.00 570,700.00
Pasir Beton Kg 670 128.57 86,142.86
Kerikil (Maks 30mm) Kg 1,006 177.78 178,844.44
Air Liter 215 - -
JUMLAH HARGA BAHAN 835,687.30
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 1,106,587.30
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 1,106,587.30

12 4.1.1.12 Membuat 1 m3 beton mutu f'c=31,2 Mpa (K 350),slump ( 12 ± 2) cm, w/c = 0,48
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 2.1000 102,500.00 215,250.00
Tukang Batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala Tukang L.03 OH 0.0350 115,000.00 4,025.00
Mandor L.17 OH 0.1050 125,000.00 13,125.00
JUMLAH TENAGA KERJA 270,900.00
B. BAHAN
Semen Portland Kg 448 1,300.00 582,400.00
Pasir Beton Kg 667 128.57 85,757.14
Kerikil (Maks 30mm) Kg 1,000 177.78 177,777.78
Air Liter 215 - -
JUMLAH HARGA BAHAN 845,934.92
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 1,116,834.92
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 1,116,834.92
13 4.1.1.13 Pembesian 10 kg dengan besi polos atau besi ulir
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0700 102,500.00 7,175.00
Tukang Besi L.08 OH 0.0700 110,000.00 7,700.00
Kepala Tukang L.09 OH 0.0070 115,000.00 805.00
Mandor L.17 OH 0.0040 125,000.00 500.00
JUMLAH TENAGA KERJA 16,180.00
B. BAHAN
Besi beton (polos/ulir) kg 10.5000 13,000.00 136,500.00
Kawat beton kg 0.1500 18,000.00 2,700.00
JUMLAH HARGA BAHAN 139,200.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 155,380.00
E. Overhead & Profit 30% x D 46,614.00
F. Harga Satuan Pekerjaan (D+E) 201,994.00
Harga Satuan Pekerjaan/ kg 20,199.40

14 4.1.1.14 Pemasangan 1 m2 bekisting untuk sloof


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5200 102,500.00 53,300.00
Tukang Kayu L.04 OH 0.2600 110,000.00 28,600.00
Kepala Tukang L.05 OH 0.0260 115,000.00 2,990.00
Mandor L.17 OH 0.0260 125,000.00 3,250.00
JUMLAH TENAGA KERJA 88,140.00
B. BAHAN
Kayu Kelas III m3 0.045 3,700,000.00 166,500.00
Paku 5 - 10 cm kg 0.300 20,000.00 6,000.00
Minyak bekisting/Solar Liter 0.100 7,000.00 700.00
JUMLAH HARGA BAHAN 173,200.00
C. PERALATAN 57,733.3333
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 145,873.33
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 145,873.33
G Harga Satuan Pekerjaan (D+E)/ 3 X PAKAI 145,873.33

15 4.1.1.15 Pemasangan 1 m2 bekisting untuk kolom


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6600 102,500.00 67,650.00
Tukang Kayu L.04 OH 0.3300 110,000.00 36,300.00
Kepala Tukang L.05 OH 0.0330 115,000.00 3,795.00
Mandor L.17 OH 0.0330 125,000.00 4,125.00
JUMLAH TENAGA KERJA 111,870.00
B. BAHAN
Kayu Kelas III m3 0.040 3,700,000.00 148,000.00
Paku 5 - 12 cm kg 0.400 20,000.00 8,000.00
Minyak bekisting/Solar Liter 0.200 7,000.00 1,400.00
Balok kayu kelas II m3 0.015 3,500,000.00 52,500.00
Plywood tebal 9 mm Lbr 0.350 85,000.00 29,750.00
Seseh Balok, panjang 4m btng 2.000 106,560.00 213,120.00
JUMLAH HARGA BAHAN 452,770.00
C. PERALATAN 150,923.3333
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 262,793.33
E. Overhead & Profit 30% x D 78,838.00
F. Harga Satuan Pekerjaan (D+E) 341,631.33
G Harga Satuan Pekerjaan (D+E)/ HARGA 3 X PAKAI 170,815.67
16 4.1.1.16 Pemasangan 1 m2 bekisting untuk balok
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6600 102,500.00 67,650.00
Tukang Kayu L.04 OH 0.3300 110,000.00 36,300.00
Kepala Tukang L.05 OH 0.0330 115,000.00 3,795.00
Mandor L.17 OH 0.0330 125,000.00 4,125.00
JUMLAH TENAGA KERJA 111,870.00
B. BAHAN
Kayu kelas III m3 0.040 3,700,000.00 148,000.00
Paku 5 - 12 cm kg 0.400 20,000.00 8,000.00
Minyak bekisting/Solar Liter 0.200 7,000.00 1,400.00
Balok kayu kelas II m3 0.018 3,500,000.00 63,000.00
Plywood tebal 9 mm Lbr 0.350 85,000.00 29,750.00
Seseh Balok, panjang 4m btng 2.000 106,560.00 213,120.00
JUMLAH HARGA BAHAN 463,270.00
C. PERALATAN 154,423.3333
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 266,293.33
E. Overhead & Profit 30% x D 79,888.00
F. Harga Satuan Pekerjaan (D+E) 346,181.33
G Harga Satuan Pekerjaan (D+E)/ HARGA 3 X PAKAI 173,090.67

17 4.1.1.17 Pemasangan 1 m2 bekisting untuk lantai


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6600 102,500.00 67,650.00
Tukang Kayu L.04 OH 0.3300 110,000.00 36,300.00
Kepala Tukang L.05 OH 0.0330 115,000.00 3,795.00
Mandor L.17 OH 0.0330 125,000.00 4,125.00
JUMLAH TENAGA KERJA 111,870.00
B. BAHAN
Kayu kelas III m3 0.040 3,700,000.00 148,000.00
Paku 5 - 12 cm kg 0.400 20,000.00 8,000.00
Minyak bekisting/Solar Liter 0.200 7,000.00 1,400.00
Balok kayu kelas II m3 0.015 3,500,000.00 52,500.00
Plywood tebal 9 mm Lbr 0.350 85,000.00 29,750.00
Seseh Balok, panjang 4m btng 3.000 106,560.00 319,680.00
JUMLAH HARGA BAHAN 559,330.00
C. PERALATAN 279,665.0000
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 391,535.00
E. Overhead & Profit 30% x D 117,460.50
F. Harga Satuan Pekerjaan (D+E) 508,995.50
G Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI 254,497.75

18 4.1.1.18 Pemasangan 1 m2 bekisting untuk tangga


NO. KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.6600 102,500.00 67,650.00
Tukang Kayu L.04 OH 0.3300 110,000.00 36,300.00
Kepala Tukang L.05 OH 0.0330 115,000.00 3,795.00
Mandor L.17 OH 0.0330 125,000.00 4,125.00
JUMLAH TENAGA KERJA 111,870.00
B. BAHAN
Kayu kelas III m3 0.030 3,700,000.00 111,000.00
Paku 5 - 12 cm kg 0.400 20,000.00 8,000.00
Minyak bekisting/Solar Liter 0.150 7,000.00 1,050.00
Balok kayu kelas II m3 0.015 3,500,000.00 52,500.00
Plywood tebal 9 mm Lbr 0.350 85,000.00 29,750.00
Seseh Balok, panjang 4m btng 2.000 106,560.00 213,120.00
JUMLAH HARGA BAHAN 415,420.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 527,290.00
E. Overhead & Profit 30% x D 158,187.00
F. Harga Satuan Pekerjaan (D+E) 685,477.00
G Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI 342,738.50
19 4.1.1.19 Pemasangan 1 m1 Kolom praktis beton bertulang (11 x 11) cm
NO. KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1800 102,500.00 18,450.00
Tukang Batu OH 0.0200 110,000.00 2,200.00
Tukang Kayu OH 0.0200 110,000.00 2,200.00
Tukang Besi OH 0.0200 110,000.00 2,200.00
Kepala Tukang OH 0.0060 115,000.00 690.00
Mandor OH 0.0090 125,000.00 1,125.00
JUMLAH TENAGA KERJA 26,865.00
B. BAHAN
Kayu Kelas III m3 0.002 3,700,000.00 7,400.00
Paku Biasa 5cm - 12cm kg 0.010 20,000.00 200.00
Besi Beton polos kg 3.000 13,000.00 39,000.00
Kawat Beton kg 0.450 18,000.00 8,100.00
Semen Portland ( Gersik) kg 4.000 1,300.00 5,200.00
Pasir Beton m3 0.006 180,000.00 1,080.00
Koral Beton m3 0.009 240,000.00 2,160.00
JUMLAH HARGA BAHAN 63,140.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 90,005.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 90,005.00

20 4.1.1.20 Pemasangan 1 m1 Kolom praktis beton bertulang (10 x 15) cm


NO. KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
URAIAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2970 102,500.00 30,442.50
Tukang Batu OH 0.0330 110,000.00 3,630.00
Tukang Kayu OH 0.0330 110,000.00 3,630.00
Tukang Besi OH 0.0330 110,000.00 3,630.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 125,000.00 1,875.00
JUMLAH TENAGA KERJA 44,357.50
B. BAHAN
Kayu Kelas III m3 0.003 3,700,000.00 11,100.00
Paku Biasa 5cm - 12cm kg 0.020 20,000.00 400.00
Besi Beton Polos kg 3.600 13,000.00 46,800.00
Kawat Beton kg 0.050 18,000.00 900.00
Semen Portland ( Gersik) kg 5.500 1,300.00 7,150.00
Pasir Beton m3 0.009 180,000.00 1,620.00
Koral Beton m3 0.015 240,000.00 3,600.00
71,570.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 115,927.50
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 115,927.50
III 3.1.1 PEKERJAAN PONDASI
1 3.1.1.1 Pemasangan 1 m3 Pondasi Batu Kosong (Anstamping)
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.7800 102,500.00 79,950.00
Tukang Batu L.02 OH 0.3900 110,000.00 42,900.00
Kepala Tukang L.03 OH 0.0390 115,000.00 4,485.00
Mandor L.17 OH 0.0390 150,000.00 5,850.00
JUMLAH TENAGA KERJA 133,185.00
B. BAHAN
Batu kali m3 1.300 195,000.00 253,500.00
Semen Portland Kg 202.000 1,300.00 262,600.00
Pasir Urug m3 0.432 150,000.00 64,800.00
JUMLAH HARGA BAHAN 580,900.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 714,085.00
E. Overhead & Profit 27% x D 192,802.95
F. Harga Satuan Pekerjaan (D+E) 906,887.95

2 3.1.1.2 Pemasangan 1 m3 Pondasi Batu Kali Campuran 1SP :3PP


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.5000 102,500.00 153,750.00
Tukang Batu L.02 OH 0.7500 110,000.00 82,500.00
Kepala Tukang L.03 OH 0.0750 115,000.00 8,625.00
Mandor L.17 OH 0.0750 125,000.00 9,375.00
JUMLAH TENAGA KERJA 254,250.00
B. BAHAN
Batu kali m3 1.200 195,000.00 234,000.00
Semen Portland Kg 202.000 1,300.00 262,600.00
Pasir Pasang m3 0.485 150,000.00 72,750.00
JUMLAH HARGA BAHAN 569,350.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 823,600.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 823,600.00

3 3.1.1.3 Pemasangan 1 m3 Pondasi Batu Kali Campuran 1SP : 5PP


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.5000 102,500.00 153,750.00
Tukang Batu L.02 OH 0.7500 110,000.00 82,500.00
Kepala Tukang L.03 OH 0.0750 115,000.00 8,625.00
Mandor L.17 OH 0.0750 125,000.00 9,375.00
JUMLAH TENAGA KERJA 254,250.00
B. BAHAN
Batu kali m3 1.300 195,000.00 253,500.00
Semen Portland Kg 136.000 1,300.00 176,800.00
Pasir Pasang m3 0.544 150,000.00 81,600.00
JUMLAH HARGA BAHAN 511,900.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 766,150.00
E. Overhead & Profit 25% x D 191,537.50
F. Harga Satuan Pekerjaan (D+E) 957,687.50
II 1.5.1 PEKERJAAN TANAH
1 1.5.1.1 Pek. Pengeboran 1 m Galian Pondasi Bore pile Ø 30 cm
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Upah Bor m1 1.0000 30,000.00 30,000.00
JUMLAH TENAGA KERJA 30,000.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN -
Mesin Bor Unit 1.0000 50,000.00 50,000.00
JUMLAH HARGA ALAT 50,000.00

D. Jumlah (A + B + C) 80,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 80,000.00

2 1.5.1.2 Penggalian 1 m3 Tanah Biasa Sedalam 1 m


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.7500 102,500.00 76,875.00
Mandor L17 OH 0.0250 125,000.00 3,125.00
JUMLAH TENAGA KERJA 80,000.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 80,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 80,000.00

3 1.5.1.3 Penggalian 1 m3 Tanah Biasa Sedalam 2 m


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.7500 102,500.00 76,875.00
Mandor L.17 OH 0.0250 125,000.00 3,125.00
JUMLAH TENAGA KERJA 80,000.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 80,000.00
E. Overhead & Profit 30% x D 24,000.00
F. Harga Satuan Pekerjaan (D+E) 104,000.00

4 1.5.1.4 Penggalian 1 m3 Tanah Lumpur /Sediman Sedalam 1 m Tertutup


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.2000 102,500.00 123,000.00
Mandor L.17 OH 0.0450 125,000.00 5,625.00
JUMLAH TENAGA KERJA 128,625.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 128,625.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 128,625.00
5 1.5.1.5 Penggalian 1 m3 Tanah Lumpur /Sediman Sedalam 1 m Terbuka
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.7500 102,500.00 76,875.00
Mandor L.17 OH 0.0250 125,000.00 3,125.00
JUMLAH TENAGA KERJA 80,000.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 80,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 80,000.00

6 1.5.1.6 Penggalian 1 m3 Tanah Lumpur Sedalam 1 m


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.2000 102,500.00 123,000.00
Mandor L.17 OH 0.0450 125,000.00 5,625.00
JUMLAH TENAGA KERJA 128,625.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 128,625.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 128,625.00

7 1.5.1.7 Penggalian 1 m3 Tanah Keras Dalam 1 m


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.0000 102,500.00 102,500.00
Mandor L.17 OH 0.0320 125,000.00 4,000.00
JUMLAH TENAGA KERJA 106,500.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 106,500.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 106,500.00

8 1.5.1.8 Mengerjakan 1 m2 Stripping Tebing Setinggi 1m


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0500 102,500.00 5,125.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 5,750.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 5,750.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 5,750.00
9 1.5.1.9 Pengurugan Kembali 1 m3 Galian Tanah
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5000 102,500.00 51,250.00
Mandor L.17 OH 0.0500 125,000.00 6,250.00
JUMLAH TENAGA KERJA 57,500.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 57,500.00
E. Overhead & Profit 30% x D 17,250.00
F. Harga Satuan Pekerjaan (D+E) 74,750.00

10 1.5.1.10 Pengurugan 1 m3 Dengan Limestone + Di Padatkan


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 102,500.00 30,750.00
Mandor L.17 OH 0.0100 125,000.00 1,250.00
JUMLAH TENAGA KERJA 32,000.00
B. BAHAN
Limestone m3 1.200 125,000.00 150,000.00
JUMLAH HARGA BAHAN 150,000.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 182,000.00
E. Overhead & Profit 30% x D 54,600.00
F. Harga Satuan Pekerjaan (D+E) 236,600.00

11 1.5.1.11 Pengurugan 1 m3 Dengan Pasir Urug


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 102,500.00 30,750.00
Mandor L.17 OH 0.0100 125,000.00 1,250.00
JUMLAH TENAGA KERJA 32,000.00
B. BAHAN
Pasir Urug m3 1.200 150,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 212,000.00
E. Overhead & Profit 30% x D 63,600.00
F. Harga Satuan Pekerjaan (D+E) 275,600.00

12 1.5.1.12 1 m3 Membuang Tanah Sisa Galian /Lumpur Sampah Keluar Lokasi Sejauh 30 m'
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3300 102,500.00 33,825.00
Mandor L.17 OH 0.0100 125,000.00 1,250.00
JUMLAH TENAGA KERJA 35,075.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 35,075.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 35,075.00

13 1.5.1.13 1 m3 Membuang Tanah Sisa Galian /Lumpur Sampah Keluar Lokasi lebih dari 30 m'/D 100 m'
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3300 102,500.00 33,825.00
Mandor L.17 OH 0.0100 125,000.00 1,250.00
JUMLAH TENAGA KERJA 35,075.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN -
Ongkos Kendaraan ls 1.0000 200,000.00 200,000.00
JUMLAH HARGA ALAT 200,000.00

D. Jumlah (A + B + C) 235,075.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 235,075.00
I 1.1.1 PEKERJAAN PERSIAPAN
1 1.1.1.1 Pengukuran dan Pasang 1 m' Bouwplank
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 102,500.00 10,250.00
Tukang kayu L.04 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.05 OH 0.0100 115,000.00 1,150.00
Mandor L.17 OH 0.0050 125,000.00 625.00
JUMLAH TENAGA KERJA 23,025.00
B. BAHAN
Kayu seseh m3 0.012 3,700,000.00 44,400.00
Paku 2-3 Kg 0.020 20,000.00 400.00
Papan begesting 2/20 m3 0.007 25,000.00 175.00
JUMLAH HARGA BAHAN 44,975.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 68,000.00
E. Overhead & Profit 30% x D 20,400.00
F. Harga Satuan Pekerjaan (D+E) 88,400.00
REKAPITULASI DAFTAR ANALISA HARGA SATUAN PEKERJAAN

NO URAIAN PEKERJAAN HARGA


1 2 3

I 1.1.1 PEKERJAAN PERSIAPAN


1 1.1.1.1 Pengukuran dan Pasang 1 m' Bouwplank Rp 88,400.00

II 1.5.1 PEKERJAAN TANAH


1 1.5.1.1 Pek. Pengeboran 1 m Galian Pondasi Bore pile Ø 30 cm Rp 80,000.00
2 1.5.1.2 Penggalian 1 m3 Tanah Biasa Sedalam 1 m Rp 80,000.00
3 1.5.1.3 Penggalian 1 m3 Tanah Biasa Sedalam 2 m Rp 104,000.00
4 1.5.1.4 Penggalian 1 m3 Tanah Lumpur /Sediman Sedalam 1 m Tertutup Rp 128,625.00
5 1.5.1.5 Penggalian 1 m3 Tanah Lumpur /Sediman Sedalam 1 m Terbuka Rp 80,000.00
6 1.5.1.6 Penggalian 1 m3 Tanah Lumpur Sedalam 1 m Rp 128,625.00
7 1.5.1.7 Penggalian 1 m3 Tanah Keras Dalam 1 m Rp 106,500.00
8 1.5.1.8 Mengerjakan 1 m2 Stripping Tebing Setinggi 1m Rp 5,750.00
9 1.5.1.9 Pengurugan Kembali 1 m3 Galian Tanah Rp 74,750.00
10 1.5.1.10 Pengurugan 1 m3 Dengan Limestone + Di Padatkan Rp 236,600.00
11 1.5.1.11 Pengurugan 1 m3 Dengan Pasir Urug Rp 275,600.00
12 1.5.1.12 1 m3 Membuang Tanah Sisa Galian /Lumpur Sampah Keluar Lokasi Sejauh 30 m' Rp 35,075.00
13 1.5.1.13 1 m3 Membuang Tanah Sisa Galian /Lumpur Sampah Keluar Lokasi lebih dari 30 m'/D 100 m' Rp 235,075.00

III 3.1.1 PEKERJAAN PONDASI


1 3.1.1.1 Pemasangan 1 m3 Pondasi Batu Kosong (Anstamping) Rp 906,887.95
2 3.1.1.2 Pemasangan 1 m3 Pondasi Batu Kali Campuran 1SP :3PP Rp 823,600.00
3 3.1.1.3 Pemasangan 1 m3 Pondasi Batu Kali Campuran 1SP : 5PP Rp 957,687.50

IV 4.1.1 HARGA SATUAN PEKERJAAN BETON, BEKISTING DAN PEMBESIAN


1 4.1.1.1 Membuat 1 m3 beton mutu F'c=7,4 (K100), slump (12 ± 2) cm,w/c =0,87 Rp 823,398.57
2 4.1.1.2 Membuat 1 m3 beton mutu F'c=9,8(K125), slump (12 ± 2) cm,w/c =0,78 Rp 858,138.25
3 4.1.1.3 Membuat 1 m3 beton mutu F'c=12,2(K150), slump (12 ± 2) cm,w/c =0,72 Rp 885,198.57
4 4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), Slump (3-6)cm, w/c = 0,87 Rp 976,549.68
5 4.1.1.5 Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66 Rp 917,417.62
6 4.1.1.6 Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61 Rp 947,844.60
7 4.1.1.7 Membuat 1 m3 beton mutu f'c=19,3 Mpa(K 225),slump ( 12 ±2) cm, w/c = 0,58 Rp 1,262,490.05
8 4.1.1.8 Membuat 1 m3 beton mutu f'c=21,7 Mpa(K 250),slump ( 12 ±2) cm, w/c = 0,56 Rp 1,028,852.54
9 4.1.1.9 Membuat 1 m3 beton mutu f'c=24,0 Mpa(K 275),slump ( 12 ±2) cm, w/c = 0,53 Rp 1,011,112.86
10 4.1.1.10 Membuat 1 m3 beton mutu f'c=26,4 Mpa(K 300),slump ( 12 ± 2) cm, w/c = 0,52 Rp 1,018,938.25
11 4.1.1.11 Membuat 1 m3 beton mutu f'c=28,8 Mpa(K 325),slump ( 12 ± 2) cm, w/c = 0,49 Rp 1,106,587.30
12 4.1.1.12 Membuat 1 m3 beton mutu f'c=31,2 Mpa (K 350),slump ( 12 ± 2) cm, w/c = 0,48 Rp 1,116,834.92
13 4.1.1.13 Pembesian 10 kg dengan besi polos atau besi ulir Rp 201,994.00
13 A 4.1.1.13 A Pembesian 1 kg dengan besi polos atau besi ulir Rp 20,199.40
14 4.1.1.14 Pemasangan 1 m2 bekisting untuk sloof Rp 145,873.33
14.A 4.1.1.14.A Pemasangan 1 m2 bekisting untuk sloof 3 x pakai Rp 145,873.33
15 4.1.1.15 Pemasangan 1 m2 bekisting untuk kolom Rp 341,631.33
15.A 4.1.1.15.A Pemasangan 1 m2 bekisting untuk kolom 3 x Pakai Rp 170,815.67
16 4.1.1.16 Pemasangan 1 m2 bekisting untuk balok Rp 346,181.33
16.A 4.1.1.16.A Pemasangan 1 m2 bekisting untuk balok 3 x Pakai Rp 173,090.67
17 4.1.1.17 Pemasangan 1 m2 bekisting untuk lantai Rp 508,995.50
17.A 4.1.1.17 Pemasangan 1 m2 bekisting untuk lantai 2 x Pakai Rp 254,497.75
18 4.1.1.18 Pemasangan 1 m2 bekisting untuk tangga Rp 685,477.00
18.A 4.1.1.18 A Pemasangan 1 m2 bekisting untuk tangga 2 x Pakai Rp 342,738.50
19 4.1.1.19 Pemasangan 1 m1 Kolom praktis beton bertulang (11 x 11) cm Rp 90,005.00
20 4.1.1.20 Pemasangan 1 m1 Kolom praktis beton bertulang (10 x 15) cm Rp 115,927.50

V 4.2.1 PEKERJAAN BESI DAN ALUMINIUM


1 4.2.1.1 1 M2 Pek. Kap. Baja Ringan Profil C Rp 211,380.00
2 4.2.1.2 1 M1 Pek. Kap. Baja Ringan Profil U Rp 375,577.91

VI PEKERJAAN PASANGAN DINDING


1 4.4.1.1 Pemasangan 1 m2 Batako 1 : 5 cetak buntu Rp 111,881.25
2 4.4.1.2 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 3 PP Rp 163,092.80
3 4.4.1.3 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 4 PP Rp 166,413.91
4 4.4.1.4 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 5 PP Rp 120,109.00

VII 4.4.2 PEKERJAAN PLESTERAN


1 4.4.2.1 Pemasangan 1 m² Plesteran 1 SP : 5 PP tebal 15 mm Rp 58,235.08
2 4.4.2.2 Pemasangan 1 m² acian Rp 45,750.00
3 4.4.2.3 Pekerjaan Pemasangan Bata Press Tulikup tanpa nat Rp 639,383.74

VIII 4.4.3 PEKERJAAN PASANGAN PENUTUP LANTAI DAN PENUTUP DINDING


1 4.4.3.1 Pemasangan 1 m² lantai keramik ukuran 30 cm x30 cm KW 1 Rp 222,900.00
2 4.4.3.2 Pemasangan 1 m² lantai keramik ukuran 40 cm x 40 cm kw 1 Rp 172,565.00
3 4.4.3.3 Pemasangan 1 m plint ubin uk. 10x30 cm Rp 30,300.33
4 4.4.3.4 Pemasangan 1 m plint Keramik Asia Tile uk. 10x40 cm Rp 30,489.92
5 4.4.3.5 Pemasangan 1 m² Dinding keramik ukuran 25 cm x 40 cm Rp 204,190.00
6 4.4.3.6 Pemasangan 1 m² Ubin Pemandu ukuran 30 cm x30 cm Rp 284,225.91

IX 4.5.1 PEKERJAAN PLAFON


1 4.5.1.1 Pemasangan 1 m² langit-langit gypsum board ukuran (120 x 240 x 9) mm,(tanpa Rangka) Rp 50,542.50
2 4.5.1.2 Pemasangan 1 m² langit-langit Kalsiboard ukuran (120 x 240 x 3) mm,(tanpa Rangka) Rp 50,138.00
3 4.5.1.3 Pemasangan 1 m' list gypsum Rp 14,829.25
4 4.5.1.4 1 m' pasangan list langit-langit kayu profil Rp 18,337.50
5 4.5.1.5 Pemasangan 1 m² rangka besi hollow 1x40.40.4 m, Untuk Plafond Rp 62,617.50
6 4.5.1.6 Pemasangan 1 m² Dinding partisi gypsum rangka hollow Rp 119,500.00
NO URAIAN PEKERJAAN HARGA
1 2 3
X 4.5.2 PEKERJAAN PENUTUP ATAP
1 4.5.2.1 Pemasangan 1 m2 Atap Kodok Sejati Rp 113,045.00
2 4.5.2.2 Pemasangan 1 m' Bubungan Kodok Sejati Rp 98,250.00
3 4.5.2.3 1 M2 Pasang Seng Spandek Rp 98,797.50
4 4.5.2.4 Pek. 10 M' Bubungan Atap Seng Rp 113,625.00
5 4.5.2.5 Pek. 1 Bh Pasangan Murda Paras Rp 234,390.00
6 4.5.2.6 Pek. 1 Bh Pasangan Ikut Celedu Paras Rp 234,390.00

XI 4.6.1 PEKERJAAN KAYU


1 4.6.1.1 Pembuatan dan pemasangan 1 M3 Kusen Kamper pintu dan jendela kayu Bingkerai Rp 17,654,750.00
2 4.6.1.2 Pembuatan dan pemasangan 1 M3 Kusen Kruing pintu dan jendela kayu kruwing Rp 10,981,500.00
3 4.6.1.3 Pembuatan dan pemasangan 1 M3 Kusen dan jendela jati Rp 13,804,750.00
4 4.6.1.4 1 m2 Daun Jendela Kaca 3 mm,Kayu kruwing Rp 663,100.00
5 4.6.1.5 Pembuatan dan pemasangan 1 m² rangka pintu dan jendela kaca, kayu kamper Rp 662,055.00
6 4.6.1.6 Pembuatan dan pemasangan 1 m² pintu panil, kayu Bingkerai Rp 1,001,750.00
7 4.6.2.11 Pemasangan 1 m² kaca tebal 3 mm Rp 165,112.50
8 4.6.2.12 Pemasangan 1 m² kaca tebal 8 mm Rp 423,904.38
9 4.6.1.7 Pembuatan 1 M2 daun pintu plywood rangkap,rangka kayu kamper tertutup ( lebar sampai 90 cm) Rp 690,431.25
10 4.6.1.8 Pemasangan 1 m' list plank ukuran (3x20) cm , kayu kamper Rp 142,111.25

XII 4.6.2 PEKERJAAN KUNCI DAN KACA


1 4.6.2.1 1 Bh Pasang Kunci Pintu Double Handle Komplit Rp 860,750.00
2 4.6.2.2 1 Bh Pasang Kunci Pintu Handle Komplit Rp 616,112.50
3 4.6.2.3 1 Bh Pasang Kunci Pintu Sleding Handle Komplit Rp 529,862.50
4 4.6.2.4 1 Bh Pasang Espagnolet Rp 285,750.00
5 4.6.2.5 1 Pasang Engsel Pintu Rp 86,531.75
6 4.6.2.6 1 Pasang Engsel Jendela Rp 70,282.25
7 4.6.2.7 1 Pasang Kait Angin Rp 64,532.25
8 4.6.2.8 1 Bh Grendel Pintu Rp 76,115.00
9 4.6.2.9 1 Bh Pasang Grendel Jendela Rp 63,957.25
10 4.6.2.10 1 Bh Pasang Rel Pintu Sleding Rp 410,750.00

XIII 4.7.1 PEKERJAAN PENGECATAN


1 4.7.1.1 Pengecatan 1 M² tembok eksterior Rp 48,686.00
2 4.7.1.2 cat interior Rp 47,219.00
3 4.7.1.3 Pelaburan 1 m2 bidang kayu dengan politur Rp 85,876.25
4 4.7.1.4 1 M2 Pek.Bidang kayu baru (1 plamir, 1 lapis cat dasar, 2 lapis cat penutup) Rp 58,144.00

XIV 5.1.1 PEKERJAAN SANITASI DALAM GEDUNG


1 5.1.1.1 Memasang 1 Buah Kloset Duduk Rp 2,746,660.00
2 5.1.1.2 Memasang 1 Buah Kloset Jongkok Porselin Rp 614,050.00
3 5.1.1.3 Memasang 1 Buah Urinoir Rp 2,384,550.00
4 5.1.1.4 Memasang 1 Buah Wastafel Rp 820,550.00
5 5.1.1.5 Memasang 1 Bh Floor Drain Rp 153,870.00
6 5.1.1.6 Memasang 1 Bh Kran Air Rp 147,940.00
7 5.1.1.7 Memasang 1 Bh Jet Sower Rp 407,940.00
8 5.1.1.8 1 M' Pas. Pipa PVC Tipe AW 0.5" Rp 29,386.50
9 5.1.1.9 1 M' Pas. Pipa PVC Tipe AW 3/4" Rp 37,836.50
10 5.1.1.10 1 M' Pas. Pipa PVC Tipe AW 1" Rp 53,599.00
11 5.1.1.11 1 M' Pas. Pipa PVC Tipe AW 3" Rp 135,501.28
12 5.1.1.12 1 M' PAS. PIPA PVC TIPE AW 4" Rp 202,980.54

XV 6.1.1 PEKERJAAN ELECTRIKAL


1 6.1.1.1 Pekerjaan Instalasi titik lampu Rp 248,400.00
2 6.1.1.2 Pekerjaan Instalasi titik Saklar/Stopkontak Rp 258,750.00
3 6.1.1.3 Pasang Saklar Tunggal Rp 31,000.00
4 6.1.1.4 Pasang Saklar Ganda Rp 38,500.00
5 6.1.1.5 Pasang Stopkontak Rp 38,500.00
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL


LOKASI : DENPASAR
TAHUN : 2023

JUMLAH HARGA
No. URAIAN PEKERJAAN MATERIAL + UPAH
(Rp.)

I PEKERJAAN PERSIAPAN Rp 47,111,445.52

II PEKERJAAN LANTAI SATU Err:509

III PEKERJAAN LANTAI DUA Err:509

IV PEKERJAAN ATAP Err:509

V PEKERJAAN EXTERNAL BANGUNAN #REF!

REAL COST Err:509


DIBULATKAN Err:509

TERBILANG : -

Luas Lantai
Lantai Satu 67.36
Lantai Dua 56.23
Lantai Atap 19.29
TOTAL 142.89 m2
Err:509 /m2

Note :
Harga Diatas Belum Termasuk :
- Pekerjaan Interior
- Pekerjaan Penataan Halaman, Landscape, dan Saluran Got Depan Lahan.
- Sambungan Listrik ke PLN, Amprah Listrik dan Air Sementara untuk Proses Kerja
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL


LOKASI : DENPASAR
TAHUN : 2023

JUMLAH HARGA
No. URAIAN PEKERJAAN MATERIAL + UPAH
(Rp.)

I PEKERJAAN PERSIAPAN Rp 47,111,445.52

II PEKERJAAN LANTAI SATU Err:509

III PEKERJAAN LANTAI DUA Err:509

IV PEKERJAAN ATAP Err:509

V PEKERJAAN EXTERNAL BANGUNAN #REF!

REAL COST Err:509


DIBULATKAN Err:509

TERBILANG : -

Note :
Harga Diatas Belum Termasuk :
- Pekerjaan Interior
- Pekerjaan Penataan Halaman, Landscape, dan Saluran Got Depan Lahan.
- Sambungan Listrik ke PLN, Amprah Listrik dan Air Sementara untuk Proses Kerja
CV. L O D Λ
Architect | Interior | Contractor

infolodadesign@gmail.com
Jalan Raya Payangan, Br. Bayad, Gianyar, Bali.

PENGAJUAN RENCANA ANGGARAN BIAYA


PROYEK : RUMAH TINGGAL
LOKASI : BATUBULAN

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN MATERIAL + UPAH MATERIAL + UPAH
(Rp.) (Rp.)
1 2 3 4 5 6

I PEKERJAAN RENOVASI
A PEKERJAAN PASANGAN DINDING
1 Servis Dinding Ruang Tidur Tengah 29.51 m2 Rp 21,000.00 Rp 619,710.00
2 Servis Dinding Ruang Tidur Selatan 28.99 m2 Rp 21,000.00 Rp 608,790.00
3 Servis Dinding Ruang Dapur 13.95 m2 Rp 21,000.00 Rp 292,950.00
4 Pek. Servis Tembok Std. Wellproof dan Pengecatan Dinding Std. Welldone Ruang Tidur Utara 43.09 m2 Rp 47,219.00 Rp 2,034,666.71
5 Pek. Pemasangan Granit Dinding Ruang Tidur Tengah 29.51 m2 Rp 341,231.00 Rp 10,069,726.81
6 Pek. Pemasangan Granit Dinding Ruang Tidur Selatan 28.99 m2 Rp 341,231.00 Rp 9,892,286.69
7 Pek. Pemasangan Granit Dinding Ruang Dapur Bagian Timur 13.95 m2 Rp 341,231.00 Rp 4,760,172.45
Total Pekerjaan A Rp 28,278,302.66

B PEKERJAAN PLAFON
1 Pembongkaran Plafon Area Teras Depan 32.16 m2 Rp 16,400.00 Rp 527,424.00
2 Pek. Pemasangan Pafon Area Teras Depan 32.16 m2 Rp 118,850.00 Rp 3,822,216.00
3 Pek. Pemasangan Shadowline Area Teras Depan 46.20 m1 Rp 24,227.00 Rp 1,119,287.40
4 Pek. Pengecetan Plafon Teras Depan Std. Welldone 32.16 m2 Rp 42,500.00 Rp 1,366,800.00
5 Pek. Pengecetan Plafon Ruang Tidur Utara Std. Welldone 12.05 m2 Rp 42,500.00 Rp 512,125.00
6 Pek. Servis dan Pengecetan Plafon Ruang Tidur Tengah Std. Welldone - m2 Rp - Rp -
7 Pek. Servis dan Pengecetan Plafon Ruang Tidur Selatan Std. Welldone - m2 Rp - Rp -
Total Pekerjaan B Rp 7,347,852.40

Total Pekerjaan I Rp 35,626,155.06


CV. L O D Λ
Architect | Interior | Contractor

infolodadesign@gmail.com
Jalan Raya Payangan, Br. Bayad, Gianyar, Bali.

PENGAJUAN RENCANA ANGGARAN BIAYA PEKERJAAN TAMBAHAN


PROYEK : RUMAH TINGGAL
LOKASI : BATUBULAN

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN MATERIAL + UPAH MATERIAL + UPAH
(Rp.) (Rp.)
1 2 3 4 5 6

I PEKERJAAN RENOVASI
A PEKERJAAN PASANGAN DINDING
1 Pek. Servis Tembok Std. Wellproof dan Pengecatan Dinding Std. Welldone Garase - m2 Rp 47,219.00 Rp -
Total Pekerjaan A Rp -

B PEKERJAAN PLAFON
1 Pek. Pembongkaran Plafon Ruang Tidur Tengah 11.45 m2 Rp 16,400.00 Rp 187,780.00
1 Pek. Pembongkaran Plafon Ruang Tidur Selatan 11.07 m2 Rp 16,400.00 Rp 181,548.00
2 Pek. Pemasangan Pafon Ruang Tidur Tengah 11.45 m2 Rp 118,850.00 Rp 1,360,832.50
2 Pek. Pemasangan Pafon Ruang Tidur Selatan 11.07 m2 Rp 118,850.00 Rp 1,315,669.50
3 Pek. Pemasangan Shadowline Area Teras Depan - m1 Rp 24,227.00 Rp -
3 Pek. Pemasangan Shadowline Ruang Tidur Selatan - m1 Rp 24,227.00 Rp -
6 Pek. Pengecetan Plafon Ruang Tidur Tengah Std. Welldone 11.45 m2 Rp 42,500.00 Rp 486,625.00
7 Pek. Pengecetan Plafon Ruang Tidur Selatan Std. Welldone 11.07 m2 Rp 42,500.00 Rp 470,475.00
Total Pekerjaan B Rp 4,002,930.00

Total Pekerjaan I Rp 4,002,930.00

Total Pekerjaan #REF!


LODΛ
Architect | Interior | Contractor

infolodadesign@gmail.com
Jalan Raya Payangan, Br. Bayad, Gianyar, Bali.

PENGAJUAN RENCANA ANGGARAN BIAYA


PROYEK : RUMAH TINGGAL
LOKASI : BATUBULAN

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN MATERIAL + UPAH MATERIAL + UPAH
(Rp.) (Rp.)
1 2 3 4 5 6

I PEKERJAAN RENOVASI
A PEKERJAAN PASANGAN DINDING
1 Servis Dinding Ruang Tidur Utara 10.23 m2 Rp 63,000.00 Rp 644,490.00
2 Servis Dinding Ruang Tidur Tengah 29.51 m2 Rp 63,000.00 Rp 1,859,130.00
3 Servis Dinding Ruang Tidur Selatan 28.99 m2 Rp 63,000.00 Rp 1,826,370.00
4 Servis Dinding Ruang Dapur 13.95 m2 Rp 63,000.00 Rp 878,850.00
5 Pek. Pemasangan Granit Dinding Ruang Tidur Utara 10.23 m2 Rp 341,231.00 Rp 3,490,793.13
6 Pek. Pemasangan Granit Dinding Ruang Tidur Tengah 29.51 m2 Rp 341,231.00 Rp 10,069,726.81
7 Pek. Pemasangan Granit Dinding Ruang Tidur Selatan 28.99 m2 Rp 341,231.00 Rp 9,892,286.69
8 Pek. Pemasangan Granit Dinding Ruang Daput 13.95 m1 Rp 341,231.00 Rp 4,760,172.45
Total Pekerjaan A Rp 33,421,819.08

B PEKERJAAN PLAFON
1 Pembongkaran Plafon Area Teras Depan 32.16 m2 Rp 16,400.00 Rp 527,424.00
2 Pembongkaran Plafon Ruang Tidur Utara 12.05 m2 Rp 16,400.00 Rp 197,620.00
3 Pembongkaran Plafon Ruang Tidur Tengah 11.45 m2 Rp 16,400.00 Rp 187,780.00
4 Pembongkaran Plafon Ruang Tidur Selatan 11.07 m2 Rp 16,400.00 Rp 181,548.00
8 Pek. Pemasangan Pafon Area Teras Depan 32.16 m2 Rp 118,850.00 Rp 3,822,216.00
5 Pek. Pemasangan Pafon Ruang Tidur Utara 12.05 m2 Rp 118,850.00 Rp 1,432,142.50
6 Pek. Pemasangan Pafon Ruang Tidur Tengah 11.45 m2 Rp 118,850.00 Rp 1,360,832.50
7 Pek. Pemasangan Pafon Ruang Tidur Selatan 11.07 m2 Rp 118,850.00 Rp 1,315,669.50
8 Pek. Pemasangan Shadowline Area Teras Depan 44.20 m1 Rp 24,227.00 Rp 1,070,833.40
5 Pek. Pemasangan Shadowline Tidur Utara 13.90 m1 Rp 24,227.00 Rp 336,755.30
6 Pek. Pemasangan Shadowline Tidur Tengah 15.04 m1 Rp 24,227.00 Rp 364,374.08
7 Pek. Pemasangan Shadowline Ruang Tidur Selatan 14.80 m1 Rp 24,227.00 Rp 358,559.60
7 Pek. Pengecetan Plafon Std. Deluxe Pentalite 66.73 m2 Rp 37,972.00 Rp 2,533,871.56
Total Pekerjaan A Rp 13,689,626.44

Total Pekerjaan I Rp 47,111,445.52

Total Pekerjaan EXTERNAL BUILDING (V.1+V.2) #REF!


LODA
Architect | Interior | Contractor

infolodadesign@gmail.com
Jalan Pakisaji, Gd Cenganasari III no 10, Denpasar, Bali.

PENGAJUAN RENCANA ANGGARAN BIAYA


PROYEK : RUMAH TINGGAL
LOKASI : DENPASAR

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN MATERIAL + UPAH MATERIAL + UPAH
(Rp.) (Rp.)
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan Pemasangan Bowplank 34.23 m1 Rp 88,400.00 Rp 3,026,285.60
2 Pek. Bedeng Pekerja dan Gudang Bahan 1.00 ls Rp - Rp -
3 Pek. Pengadaan Sumur Bor Pipa PVC 4 inchi kedalaman 60 m dan Submersible Pump Shimizu 1.00 unit Rp 9,100,000.00 Rp 9,100,000.00

Total Pekerjaan I Rp 12,126,285.60

II LANTAI SATU
II.1 PEKERJAAN STRUKTUR
II.1.A PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi Pile Cap 67.50 m3 Rp 104,000.00 Rp 7,020,000.00
2 Pek. Galian Pondasi Menerus 71.94 m1 Rp 46,000.00 Rp 3,309,194.00
3 Pek. Urugan Pasir Pondasi Pile Cap tebal 5 cm 1.69 m3 Rp 275,600.00 Rp 465,075.00
4 Pek. Urugan Pasir Pondasi Menerus tebal 5 cm 3.41 m3 Rp 275,600.00 Rp 939,038.10
5 Pek. Lantai Kerja Pondasi Pile Cap tebal 3 cm 1.01 m3 Rp 976,549.68 Rp 988,756.55
6 Pek. Lantai Kerja Pelat Lantai tebal 5 cm 3.00 m3 Rp 976,549.68 Rp 2,926,719.40
7 Pek. Pas. Batu Kosong 8.63 m3 Rp 906,887.95 Rp 7,828,873.47
8 Pek. Pas. Batu Belah Campuran 1SP : 5PP 12.23 m3 Rp 957,687.50 Rp 11,712,163.78
9 Pek. Urugan Tanah Kembali Pondasi Menerus 18.17 m3 Rp 74,750.00 Rp 1,358,357.00
10 Pek. Urugan Tanah Kembali Pondasi Pile Cap 22.50 m3 Rp 74,750.00 Rp 1,681,875.00
11 Pek. Urugan Tanah Peninggian Lantai dan Pemadatan dengan Stemper 35.96 m3 Rp 236,600.00 Rp 8,509,082.40

Total Pekerjaan A Rp 46,739,134.70

II.1.B PEKERJAAN BETON


Lantai Satu
1 Pekerjaan Beton Pilecap (100x100x25)
- Beton Sitemix 3.75 m3 Rp 1,262,490.05 Rp 4,734,337.68
- Pembesian Tulangan Pilecap Bawah D13 - 150 mm 219.94 kg Rp 20,199.40 Rp 4,442,636.52
- Pembesian Tulangan Pilecap Atas D13 - 150 mm 219.94 kg Rp 20,199.40 Rp 4,442,636.52
- Bekisting Batako 21.60 m2 Rp 111,881.25 Rp 2,416,635.00
2 Pekerjaan Beton Kolom Pedestal (140x420 mm)
- Beton Sitemix 1.76 m3 Rp 1,262,490.05 Rp 2,227,032.44
- Pembesian Tulangan 4D16 mm 359.52 kg Rp 20,199.40 Rp 7,262,121.49
- Pembesian Tulangan 6D10 mm 210.66 kg Rp 20,199.40 Rp 4,255,149.31
- Pembesian Sengkang Ø8-100 mm & Ø8-150 mm 114.06 kg Rp 20,199.40 Rp 2,303,933.61
- Bekisting Kayu 33.60 m2 Rp 170,815.67 Rp 5,739,406.40
3 Pekerjaan Beton Tie Beam (150x300 mm)
- Beton Sitemix 3.07 m3 Rp 1,262,490.05 Rp 3,871,457.29
- Pembesian Tulangan Utama 6D16 mm 762.03 kg Rp 20,199.40 Rp 15,392,629.05
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN MATERIAL + UPAH MATERIAL + UPAH
(Rp.) (Rp.)
1 2 3 4 5 6
- Pembesian Sengkang Ø8-100 mm & Ø8-150 mm 193.89 kg Rp 20,199.40 Rp 3,916,431.43
- Bekisting Batako 49.06 m2 Rp 111,881.25 Rp 5,489,386.40
4 Pekerjaan Plat Lantai Satu, t = 10 cm
- Beton Sitemix 5.99 m3 Rp 1,262,490.05 Rp 7,567,365.35
- Bekisting Kayu 5.21 m2 Rp 254,497.75 Rp 1,324,660.79
- Pembesian Wiremesh M8 1 lapis 59.94 m2 Rp 97,442.68 Rp 5,840,714.29
5 Pekerjaan Beton Kolom K1 (140x420 mm)
- Beton Sitemix 3.53 m3 Rp 1,262,490.05 Rp 4,454,064.89
- Pembesian Tulangan 4D16 mm 525.77 kg Rp 20,199.40 Rp 10,620,267.17
- Pembesian Tulangan 6D10 mm 308.07 kg Rp 20,199.40 Rp 6,222,812.80
- Pembesian Sengkang Ø8-100 mm & Ø8-150 mm 221.41 kg Rp 20,199.40 Rp 4,472,341.72
- Bekisting Kayu 67.20 m2 Rp 170,815.67 Rp 11,478,812.80
6 Pekerjaan Beton Kolom K2 (140x320 mm)
- Beton Sitemix 0.39 m3 Rp 1,262,490.05 Rp 497,724.08
- Pembesian Tulangan 4D16 mm 62.47 kg Rp 20,199.40 Rp 1,261,813.92
- Pembesian Tulangan 2D10 mm 12.20 kg Rp 20,199.40 Rp 246,448.03
- Pembesian Sengkang Ø8-100 mm & Ø8-150 mm 26.27 kg Rp 20,199.40 Rp 530,714.47
- Bekisting Kayu 10.91 m2 Rp 170,815.67 Rp 1,863,940.55
7 Pekerjaan Beton Kolom Praktis KP
- Beton Sitemix 0.24 m3 Rp 1,262,490.05 Rp 302,997.61
- Pembesian Tulangan Utama 4Ø10 mm 64.88 kg Rp 20,199.40 Rp 1,310,506.08
- Pembesian Ø.8 mm 26.58 kg Rp 20,199.40 Rp 536,987.86
- Bekisting Kayu 7.20 m2 Rp 170,815.67 Rp 1,229,872.80
8 Pekerjaan Beton Tangga
- Beton Sitemix 1.61 m3 Rp 1,262,490.05 Rp 2,033,273.11
- Pembesian Tulangan D13-150 mm 404.78 kg Rp 20,199.40 Rp 8,176,219.08
- Pembesian Tulangan D10-150 mm 50.77 kg Rp 20,199.40 Rp 1,025,497.64
- Pembesian Sengkang Ø8-150 mm 79.82 kg Rp 20,199.40 Rp 1,612,242.11
- Bekisting Kayu 13.28 m2 Rp 342,738.50 Rp 4,549,927.99
9 Pekerjaan Beton Balok Latei (110x200 mm)
- Beton Sitemix 0.30 m3 Rp 1,262,490.05 Rp 377,737.02
- Pembesian Tulangan 6D10 mm 55.72 kg Rp 20,199.40 Rp 1,125,446.01
- Pembesian Sengkang Ø.8-200 mm 18.05 kg Rp 20,199.40 Rp 364,640.33
- Bekisting Kayu 6.94 m2 Rp 173,090.67 Rp 1,200,556.86
10 Pekerjaan Beton Balok B2 Bordes (140x250 mm)
- Beton Sitemix 0.12 m3 Rp 1,262,490.05 Rp 154,655.03
- Pembesian Tulangan 9D13 mm Tumpuan 25.22 kg Rp 20,199.40 Rp 509,461.24
- Pembesian Tulangan 9D13 mm Lapangan 25.22 kg Rp 20,199.40 Rp 509,461.24
- Pembesian Sengkang Ø8-100 mm & Ø8-150 mm 9.06 kg Rp 20,199.40 Rp 182,963.02
- Bekisting Kayu 2.24 m2 Rp 173,090.67 Rp 387,723.09
11 Pekerjaan Beton Meja Dinning
- Beton Sitemix 0.12 m3 Rp 1,262,490.05 Rp 150,173.19
- Pembesian Ø8-200 mm 2 lapis 15.67 kg Rp 20,199.40 Rp 316,504.99
- Bekisting Kayu 1.19 m2 Rp 254,497.75 Rp 302,725.07
12 Pekerjaan Beton Meja Kitchen
- Beton Sitemix 0.17 m3 Rp 1,262,490.05 Rp 219,673.27
- Pembesian Ø8-200 mm 2 lapis 20.13 kg Rp 20,199.40 Rp 406,584.49
- Bekisting Kayu 1.74 m2 Rp 254,497.75 Rp 442,826.09

Lantai Dua
13 Pekerjaan Beton Balok B1 (140x300 mm)
- Beton Sitemix 2.99 m3 Rp 1,262,490.05 Rp 3,771,903.64
- Pembesian Tulangan 4D16 mm 529.97 kg Rp 20,199.40 Rp 10,705,089.11
- Pembesian Tulangan 4D10 mm Tumpuan 99.20 kg Rp 20,199.40 Rp 2,003,715.85
- Pembesian Tulangan 4D10 mm Lapangan 99.20 kg Rp 20,199.40 Rp 2,003,715.85
- Pembesian Sengkang Ø8-100 mm & Ø8-150 mm 197.58 kg Rp 20,199.40 Rp 3,990,927.84
- Bekisting Kayu 52.64 m2 Rp 173,090.67 Rp 9,111,475.38
14 Pekerjaan Beton Balok B2 (140x250 mm)
- Beton Sitemix 0.18 m3 Rp 1,262,490.05 Rp 233,087.23
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN MATERIAL + UPAH MATERIAL + UPAH
(Rp.) (Rp.)
1 2 3 4 5 6
- Pembesian Tulangan 9D13 mm Tumpuan 34.12 kg Rp 20,199.40 Rp 689,241.29
- Pembesian Tulangan 9D13 mm Lapangan 34.12 kg Rp 20,199.40 Rp 689,241.29
- Pembesian Sengkang Ø8-100 mm & Ø8-150 mm 13.74 kg Rp 20,199.40 Rp 277,599.06
- Bekisting Kayu 3.38 m2 Rp 173,090.67 Rp 584,354.09
15 Pekerjaan Beton Balok BA (110x220 mm)
- Beton Sitemix 0.19 m3 Rp 1,262,490.05 Rp 238,307.62
- Pembesian Tulangan 4D10 mm 23.59 kg Rp 20,199.40 Rp 476,466.19
- Pembesian Tulangan 4Ø8 mm Tumpuan 7.87 kg Rp 20,199.40 Rp 159,050.69
- Pembesian Tulangan 4Ø8 mm Lapangan 7.87 kg Rp 20,199.40 Rp 159,050.69
- Pembesian Sengkang Ø8-100 mm & Ø8-150 mm 16.66 kg Rp 20,199.40 Rp 336,483.71
- Bekisting Kayu 4.29 m2 Rp 173,090.67 Rp 742,558.96
16 Pekerjaan Lisplank Beton (140x750 mm)
- Beton Sitemix 1.01 m3 Rp 1,262,490.05 Rp 1,275,638.88
- Pembesian Tulangan 10D10 mm 71.33 kg Rp 20,199.40 Rp 1,440,762.58
- Pembesian Sengkang Ø8-100 mm & Ø8-150 mm 58.20 kg Rp 20,199.40 Rp 1,175,589.97
- Bekisting Kayu 15.78 m2 Rp 173,090.67 Rp 2,731,668.44
17 Pekerjaan Lisplank Beton (140x550 mm)
- Beton Sitemix 0.56 m3 Rp 1,262,490.05 Rp 700,896.60
- Pembesian Tulangan 8D10 mm 43.98 kg Rp 20,199.40 Rp 888,308.24
- Pembesian Sengkang Ø8-100 mm & Ø8-150 mm 33.78 kg Rp 20,199.40 Rp 682,431.03
- Bekisting Kayu 8.94 m2 Rp 173,090.67 Rp 1,547,499.80
18 Pekerjaan Plat Lantai Dua, t = 12 cm
- Beton Sitemix 6.32 m3 Rp 1,262,490.05 Rp 7,976,412.12
- Bekisting Kayu 57.97 m2 Rp 254,497.75 Rp 14,752,980.07
- Pembesian Wiremesh M8 2 lapis 105.30 m2 Rp 97,442.68 Rp 10,260,714.29

Total Pekerjaan B Rp 229,909,299.71

Total Pekerjaan Struktur Lantai Satu (II.1) A+B Rp 276,648,434.41

II.2 PEKERJAAN ARSITEKTUR LANTAI SATU


II.2.A PEKERJAAN PASANGAN DINDING
1 Pemasangan 1 m2 Batako 1 : 5 cetak buntu 158.66 m2 Rp 111,881.25 Rp 17,751,079.13
2 Pek. Plesteran Campuran 1 PC : 5 S 319.79 m2 Rp 58,235.08 Rp 18,622,879.76
3 Pek. Acian Dinding 298.92 m2 Rp 45,750.00 Rp 13,675,590.00
4 Pek. Pemasangan keramik Bathroom Granito 30x60 cm 17.70 m2 Rp 341,231.00 Rp 6,039,788.70
5 Pek. Pemasangan keramik Kitchen Granito 30x60 cm 6.21 m2 Rp 341,231.00 Rp 2,119,044.51
6 Pek. Pemasangan plint keramik Granito 10x60 cm 46.69 m' Rp 45,533.48 Rp 2,125,957.95
9 Pek. Pemasangan Dinding Roster 6.96 m2 Rp 812,500.00 Rp 5,655,000.00

Total Pekerjaan A Rp 65,989,340.05

II.2.B PEKERJAAN PASANGAN LANTAI


1 Pek. Lantai Keramik Granito 60x60 47.21 m2 Rp 285,811.88 Rp 13,491,749.56
2 Pek. Lantai Keramik Granito 60x60 matt area Bathroom 2.10 m2 Rp 285,811.88 Rp 600,204.94
4 Pek. Pemasangan Lantai PVC Motif Kayu 3.60 m2 Rp 275,000.00 Rp 990,000.00

Total Pekerjaan B Rp 15,081,954.50

II.2.C PEKERJAAN PLAFOND


1 Pek. Plafond Gypsum 9 mm Rangka Hollow 40x40 dan 20x40 mm Setara Indoboard 44.84 m2 Rp 113,160.00 Rp 5,073,528.60
2 Pek. Pemasangan Shadowline 66.75 m' Rp 14,829.25 Rp 989,837.61
3 Pek. Pengecatan Plafond Dulux Pentalite 44.84 m2 Rp 48,686.00 Rp 2,182,836.81
4 Pek. Pemasangan Drop Gorden 3.38 m' Rp 100,000.00 Rp 337,500.00
5 Pek. Pemasangan Plafond PVC Motif Kayu 4.98 m2 Rp 250,000.00 Rp 1,243,750.00
6 Pek. Canopy Rangka Hollow Galvanis + Atap Trimdek Trasparant 3.15 m2 Rp 975,000.00 Rp 3,071,250.00

Total Pekerjaan C Rp 12,898,703.02


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN MATERIAL + UPAH MATERIAL + UPAH
(Rp.) (Rp.)
1 2 3 4 5 6

II.2.D PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pek. Pintu Kayu Double Sliding (1 unit)
- Pek. Kusen Kayu Kamper 5/15 16.90 m1 Rp 203,000.00 Rp 3,430,700.00
- Pek. Daun Pintu Kayu Kamper 26.40 m1 Rp 203,000.00 Rp 5,359,200.00
- Pek.Kaca tebal 8 mm 4.68 m2 Rp 423,904.38 Rp 1,983,872.47
- Pek. Pasangan Kunci Pintu dan Handle Setara Dekson 1.00 set Rp 529,862.50 Rp 529,862.50
- Pek. Finishing Kusen 16.90 m1 Rp 111,790.00 Rp 1,889,251.00
- Pek. Finishing Daun Pintu 4.43 m2 Rp 171,580.00 Rp 759,241.50
- Pek. Sliding Rel 3.20 m1 Rp 653,000.00 Rp 2,089,600.00
2 Pek. Pintu Kayu Solid Swing + Jendela swing + Jendela mati (1 unit)
- Pek. Kusen Kayu Kamper 5/15 19.95 m1 Rp 203,000.00 Rp 4,049,850.00
- Pek. Daun Pintu Kayu Kamper 2.21 m2 Rp 1,255,000.00 Rp 2,773,550.00
- Pek. Pasangan Engsel Pintu Setara Dekson 3.00 bh Rp 86,531.75 Rp 259,595.25
- Pek. Pasangan Kunci Pintu Setara Dekson 1.00 bh Rp 352,000.00 Rp 352,000.00
- Pek. Pasangan Handel Pintu Setara Dekson 1.00 bh Rp 1,512,000.00 Rp 1,512,000.00
- Pek. Pasangan Door Stoper Setara Dekson 1.00 bh Rp 105,090.00 Rp 105,090.00
- Pek. Finishing Kusen 19.95 m1 Rp 111,790.00 Rp 2,230,210.50
- Pek. Finishing Daun Pintu 2.21 m2 Rp 171,580.00 Rp 378,333.90
- Pek. Daun Jendela Kayu Kamper + Kaca Bening tebal 8 mm 1.40 m2 Rp 1,255,000.00 Rp 1,760,137.50
- Pek. Pasangan Engsel Setara Dekson 2.00 bh Rp 70,282.25 Rp 140,564.50
- Pek. Pasangan Lamskar Setara Dekson 1.00 set Rp 64,532.25 Rp 64,532.25
- Pek. Pasangan Grendel Setara Dekson 1.00 bh Rp 63,957.25 Rp 63,957.25
- Pek. Kaca Bening tebal 8 mm 4.35 m2 Rp 423,904.38 Rp 1,843,984.03
3 Pek. Jendela Kayu (1 unit)
- Pek. Kusen Kayu Kamper Oven 5/15 3.00 m1 Rp 203,000.00 Rp 609,000.00
- Pek. Daun Jendela Kayu Kamper + Kaca Bening tebal 8 mm 0.34 m2 Rp 1,255,000.00 Rp 423,562.50
- Pek. Kaca Bening tebal 8 mm 0.34 m2 Rp 423,904.38 Rp 143,067.73
- Pek. Pasangan Engsel Setara Dekson 2.00 bh Rp 70,282.25 Rp 140,564.50
- Pek. Pasangan Lamskar Setara Dekson 1.00 set Rp 64,532.25 Rp 64,532.25
- Pek. Pasangan Grendel Setara Dekson 1.00 bh Rp 63,957.25 Rp 63,957.25
4 Pek. Pintu Aluminium
- Pek. Kusen dan Pintu Aluminium Kamar Mandi 1.00 ls Rp 1,589,000.00 Rp 1,589,000.00

Total Pekerjaan D Rp 34,609,216.88

II.2.E PEKERJAAN FINISHING DAN WATERPROOFING


1 Pek. Finish Cat Interior Setara Dulux Pentalite 167.60 m2 Rp 48,686.00 Rp 8,159,773.60
2 Pek. Finish Cat Exterior Setara Dulux WeatherShield 138.58 m2 Rp 47,219.00 Rp 6,543,738.87
3 Pek. Waterproofing Dinding Kamar Mandi Semen Base Setara Sika Top Seal 22.42 m2 Rp 85,100.00 Rp 1,907,942.00

Total Pekerjaan E Rp 16,611,454.47

II.2.F PEKERJAAN SANITAIR


KAMAR MANDI UTAMA
1 Pek. Pas. Closet Duduk America Standart + Ass Setara America Standart 1.00 bh Rp 2,746,660.00 Rp 2,746,660.00
- Pek. Pas. Jet Washer + Ass Setara Setara America Standart 1.00 bh Rp 407,940.00 Rp 407,940.00
Pek. Pas. Head Shower ONDA + Ass Setara ONDA 1.00 bh Rp 1,978,632.50 Rp 1,978,632.50
Pek. Pas. Floor Drain ONDA 2.00 bh Rp 153,870.00 Rp 307,740.00
Pek. Pas. Floor Drain ONDA Outdoor 2.00 bh Rp 130,870.00 Rp 261,740.00

Total Pekerjaan F Rp 5,702,712.50

Total Pekerjaan Arsitektur Lantai Satu (II.2) A+B+C+D+E+F Rp 150,893,381.42

II.3 PEKERJAAN MEP LANTAI SATU


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN MATERIAL + UPAH MATERIAL + UPAH
(Rp.) (Rp.)
1 2 3 4 5 6
II.3.A PEKERJAAN PLUMBING
1 Pemasangan dan Pengadaan Water Booster Shimitzhu 1.00 unit Rp 1,350,000.00 Rp 1,350,000.00
2 Pekerjaan Septicktank + Sumur Resapan 1.00 unit Rp 2,740,000.00 Rp 2,740,000.00
3 Pekerjaan Tandon Air Profil Tank 1.00 unit Rp 3,104,204.78 Rp 3,104,204.78
- Volume 1300 Liter
4 Pekerjaan Instalasi Pipa Air Bersih
- Pipa PVC AW 1 1/4 inch Setara Rucika Brand 35.00 m1 Rp 56,036.50 Rp 1,961,277.50
- Pipa PVC AW 1 inch Setara Rucika Brand 24.00 m1 Rp 53,599.00 Rp 1,286,376.00
- Pipa PVC AW 3/4 inch Setara Rucika Brand 20.00 m1 Rp 37,836.50 Rp 756,730.00
- Pipa PVC AW 1/2 inch Setara Rucika Brand 20.00 m1 Rp 29,386.50 Rp 587,730.00
- Aksesoris pipa dan Material Pendukung Setara Rucika Brand 1.00 ls Rp 688,817.03 Rp 688,817.03
- Kran Air Taman Wasser brand 2.00 unit Rp 147,940.00 Rp 295,880.00
5 Pekerjaan Instalasi Pipa Air Kotor
- Pipa PVC AW 3/4 Inch Setara Rucika Brand (Drain AC) 9.00 m1 Rp 37,836.50 Rp 340,528.50
- Pipa PVC AW 4 Inch Setara Rucika Brand 21.00 m1 Rp 202,980.54 Rp 4,262,591.29
- Pipa PVC AW 3 Inch Setara Rucika Brand 15.00 m1 Rp 135,501.28 Rp 2,032,519.13
- Aksesoris pipa clas AW dan Material Pendukung Setara Rucika Brand 1.00 ls Rp 995,345.84 Rp 995,345.84
6 Pekerjaan Instalasi Pipa Air Hujan
- Pipa PVC AW 4 Inch Setara Rucika Brand 16.00 m1 Rp 202,980.54 Rp 3,247,688.60
- Pipa PVC AW 3 Inch Setara Rucika Brand 33.00 m1 Rp 135,501.28 Rp 4,471,542.08
- Aksesoris pipa clas AW dan Material Pendukung Setara Rucika Brand 1.00 ls Rp 1,157,884.60 Rp 1,157,884.60

Total Pekerjaan A Rp 29,279,115.33

II.3.B PEKERJAAN MEKANIKAL


1 Pek. Pas. Air Conditioner
- Pek. AC Split 1 PK Daikin (Supply By Owner) 1.00 unit Rp - Rp -
- Pek. Pipa Refrigerant (Supply By Owner) 25.00 m1 Rp - Rp -

Total Pekerjaan B Rp -

II.3.C PEKERJAAN ELEKTRIKAL


Pekerjaan Instalasi Listrik
1 Instalasi kabel Lampu, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20 mm. 22.00 titik Rp 248,400.00 Rp 5,464,800.00
2 Instalasi kabel Stop Kontak, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20mm. 12.00 titik Rp 258,750.00 Rp 3,105,000.00
3 Instalasi kabel Saklar, NYM 3x2,5 mm2 Setara Supreme dalam konduit Clipsal 20mm. 10.00 titik Rp 258,750.00 Rp 2,587,500.00
4 Instalasi kabel AC, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20 mm. 1.00 titik Rp 351,923.00 Rp 351,923.00

Note : Harga diatas termasuk tarikan kabel, fitting dan pemasangan

Aksesoris Listrik
6 Pengadaan dan Pemasangan Panel MDP Setara Schneider Brand (Supply By Owner) 1.00 unit Rp -
7 Pekerjaan Kabel NYY 4x35 mm Setara Supreme + BC 10 mm (dari KWH Meter ke Panel MDP) 7.50 m1 Rp 372,200.00 Rp 2,791,500.00
9 Pekerjaan Kabel Grounding/BC Standard 1x25 mm 10.00 m1 Rp 47,110.00 Rp 471,100.00
10 Pemasangan Stick Rod Grounding 1.00 titik Rp 170,000.00 Rp 170,000.00
11 Spot Light 5 Watt Local Brand 4.00 bh Rp 265,500.00 Rp 1,062,000.00
12 Rumah Lampu Downlight 4'' + Downlight LED Bulb 13 watt ex. Philips 15.00 bh Rp 251,270.00 Rp 3,769,050.00
13 Saklar Tunggal ex. Panasonic 2.00 bh Rp 27,000.00 Rp 54,000.00
14 Saklar Double ex. Panasonic 8.00 bh Rp 37,000.00 Rp 296,000.00
15 Stop Kontak ex. Panasonic 10.00 bh Rp 25,000.00 Rp 250,000.00
16 Stop Kontak AC ex. Panasonic 1.00 bh Rp 62,000.00 Rp 62,000.00

Total Pekerjaan C Rp 20,434,873.00

Total Pekerjaan MEP Lantai Satu (II.3) A+B+C Rp 49,713,988.33


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN MATERIAL + UPAH MATERIAL + UPAH
(Rp.) (Rp.)
1 2 3 4 5 6

III.1.A PEKERJAAN ARSITEKTUR


1 Pemasangan 1 m2 Batako 1 : 5 cetak buntu 39.02 m2 Rp 111,881.25 Rp 4,365,746.23
2 Pek. Plesteran Campuran 1 PC : 5 S 78.04 m2 Rp 58,235.08 Rp 4,544,811.23
3 Pek. Acian Dinding 78.04 m2 Rp 45,750.00 Rp 3,570,444.37
4 Pek. Pengecatan dinding dulux weathershield 78.04 m2 Rp 47,219.00 Rp 3,685,088.81
5 Pek. Lantai Keramik Granito 60x60 13.85 m2 Rp 285,811.88 Rp 3,957,422.67
6 Pek. Canopy Rangka Hollow Galvanis + Alderon (Supply By Owner) m2 Rp - Rp -
7 Pek. Pintu Pagar SD1 (1 Unit) (Supply By Owner) m2 Rp - Rp -
- Pek. Frame dan Rangka Pintu Hollow
- Pek. Pintu Pagar Kombinasi Hollow, Trailis Besi & Perforated Mesh
- Pek. Finishing Cat Pintu Pagar
- Pek. Sliding Rel Bawah Pintu Pagar + Aksesoris

Total Pekerjaan A Rp 20,123,513.31

Total Pekerjaan Arsitek EXTERNAL BUILDING III.1) A Rp 20,123,513.31

Total Pekerjaan Lantai Satu (II.1+II.2+II.3 dan Persiapan) Rp 509,505,603.07


PERHITUNGAN VOLUME
Proyek : Rumah Tinggal
Jenis Pekerjaan : Pembangunan Rumah Tinggal Menengah
Lokasi Proyek

NO
URAIAN PEKERJAAN SAT

A PRELIMINARIES
1 Pekerjaan Bongkaran
Pek. Bongkaran Bangunan Eksisting m2

2 Pek. Persiapan
Pembangunan bedeng kerja ls
Pek. Bowplank dan pengukuran m'
Pek. Anggaran Listrik kerja ls
Pek. Air Kerja ls
Biaya Adminstrasi kependudukan tenaga kerja (kipem) 8 bulan ls
Pek. Mobilisasi Alat, Bahan dan Tenaga Kerja ls
Pek. Pembersihan Area Proyek m2
Pek. Bedeng Pekerja dan Gudang Bahan ls
Pek. Sanitasi Sementara untuk Pekerja ls
Pek. Pengadaan Sumur Bor Pipa PVC 5 inchi kedalaman 50 m dan Submersible Pump Shimizu ls
Pek. Pagar Proyek Sementara material seng tinggi 2 m m'

3 Pek. Peralatan
Pek. Sewa Alat-alat unit

PEKERJAAN PADA DENAH LANTAI 1


B PEKERJAAN TANAH DAN PONDASI
1 Pekerjaan Galian
Pek. Galian tanah biasa pondasi menerus m3
Pek Galian tanah pondasi pilecap m3

2 Pek. Urugan tanah


Pek. Urugan kembali tanah Pondasi menerus m3
Pek. Urugan kembali pondasi setempat m3
Pek. Urugan tanah peninggian lantai limestone + pemadatan m3
lantai 1

3 Pek.Urugan Pasir
Pek. Urugan Pasir Pondasi Pile Cap tebal 5 cm m3
Pek. Urugan Pasir Pondasi Menerus tebal 5 cm m3
Pek. Urugan Pasir Plat Lantai tebal 5 cm

4 Pek. Pasangan batu


Pek. Pasangan batu kosong m3
Pek. Pasangan pondasi batu kali PC 1 : 5 m3

5 Pek. lLantai kerja


Pek. Lantai Kerja Pondasi Pile Cap tebal 3 cm m3
Pek. Lantai Kerja Pelat Lantai tebal 5 cm m3

6 Pek. Lain
Pek. Semprotan Anti Rayap m2
Pek. Lapisan Plastik Polyethelene m2

C PEKERJAAN DINDING & PLESTERAN

1 Pek. Pasang dinding m2


Pek. Pas. Batu Bata Merah (5x11x22)cm Tebal 1/2 Batu (1 PC : 4 S )

2 Pek. Plesteran PC 1 : 3 m2
Pek. Plesteran dinding
area garden

3 Pek. Acian m2
Pek. Acian dinding
pasangan batu alam

D PEKERJAAN BETON

LANTAI SATU

1 Pekerjaan Pondasi Pilecap (100x100x25) 15 unit


Pek. Beton Site Mix m3
Pek. Bekisting batako m2
Pek. Besi kg

Besi D13-150
Besi D13-150
Total

2 Pekerjaan Kolom Pedestal (14x42) 15 unit


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4D16
Besi 6D10
Besi Ø8-100 & Besi Ø8-150
Total

3 Pek. Sloof (15x30)


Pek. Beton Site Mix m3
Pek. Bekisting batako m2
Pek. Besi kg

Besi 6D16
Besi Ø8-100 & Besi Ø8-150
Total

4 Pek. Kolom Praktis (10x10) 6 unit


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4Ø10
Besi Ø8-200
Total
5 Pek. Pelat Lantai Satu (t =10 cm)
Pek. Beton Site Mix m3
Pek. Begesting m2

Wiremesh M8 - 1 layers m2

6 Pek. Kolom K1 (14x42) 15 unit


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4D16
Besi 6D10
Besi Ø8-100 & Besi Ø8-150
Total

7 Pek. Kolom K2 Bordes (14x32) 2 unit


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4D16
Besi 2D10
Besi Ø8-100 & Besi Ø8-150
Total

8 Pek. Struktur Tangga


Pek. Beton Site Mix m3
anak tangga
Pelat Tangga
Pelat Bordes

Pek. Bekisting m2
anak tangga
Pelat Tangga
Pelat Bordes

Pek. Besi kg

Besi D13-150
Besi Ø10-150
Besi Ø8-150
Total

Pek. Besi bordes

Besi Ø10-150 kg

9 Pek. Balok Latei (11x20)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 6D10
Besi Ø8-200
Total

10 Pek. Balok B2 Tangga (14x25)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 9D13 Tumpuan


Besi 9D13 Lapangan
Besi Ø8-100 & Besi Ø8-150
Total

11 Pek. Struktur Beton Meja Dinning


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi Ø8-200
Besi Ø8-200
Total

12 Pek. Struktur Beton Meja Kitchen


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi Ø8-200
Besi Ø8-200
Total

LANTAI DUA

13 Pek. Balok B1 (14x30)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4D16
Besi 4D10 Tumpuan
Besi 4D10 Lapangan
Besi Ø8-100 & Besi Ø8-150
Total

14 Pek. Balok B2 (14x25)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 9D13 Tumpuan


Besi 9D13 Lapangan
Besi Ø8-100 & Besi Ø8-150
Total

15 Pek. Balok BA (11x22)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4D10
Besi 4Ø8 Tumpuan
Besi 4Ø8 Lapangan
Besi Ø8-100 & Besi Ø8-150
Total

16 Pek. Lisplank beton (14x75)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 10D10
Besi Ø8-100 & Besi Ø8-150
Total

17 Pek. Lisplank beton (14x55)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 8D10
Besi Ø8-100 & Besi Ø8-150
Total

18 Pek. Pelat Lantai Dua (t =12 cm)


Pek. Beton Site Mix m3
Pek. Begesting m2

Wiremesh M8 - 2 layers m2

II.2.D PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pek. Pintu Kayu Double Sliding (1 unit)


- Pek. Kusen Kayu Kamper Oven 5/15 m1
- Pek. Daun Pintu Kayu Kamper Oven + Kaca tebal 8 mm m2
- Pek. Pasangan Kunci Pintu Setara Dekson bh
- Pek. Pasangan Pull Handel Pintu Custom set
- Pek. Finishing Kusen m1
- Pek. Finishing Daun Pintu m2
- Pek. Sliding Rel m1
2 Pek. Pintu Kayu Solid Swing (1 unit) + 1 Jendela swing (1 unit) + Jendela mati (3 unit)
- Pek. Kusen Kayu Kamper Oven 5/15 m1
- Pek. Daun Pintu Kayu Kamper Oven m2
- Pek. Pasangan Engsel Pintu Setara Dekson bh
- Pek. Pasangan Kunci Pintu Setara Dekson bh
- Pek. Pasangan Handel Pintu Setara Dekson bh
- Pek. Pasangan Door Stoper Setara Dekson bh
- Pek. Finishing Kusen m1
- Pek. Finishing Daun Pintu m2
- Pek. Daun Jendela Kayu Kamper + Kaca Bening tebal 8 mm m2
- Pek. Pasangan Engsel Setara Dekson bh
- Pek. Pasangan Lamskar Setara Dekson set
- Pek. Pasangan Grendel Setara Dekson bh
- Pek. Kaca Bening tebal 8 mm m2
3 Pek. Pintu Kayu Swing (1 unit)
- Pek. Kusen Kayu Kamper Oven 5/15 m1
- Pek. Daun Pintu Kayu Kamper Oven m2
- Pek. Pasangan Engsel Pintu Setara Dekson bh
- Pek. Pasangan Kunci Pintu Setara Dekson bh
- Pek. Pasangan Handel Pintu Setara Dekson bh
- Pek. Finishing Kusen m1
- Pek. Finishing Daun Pintu m2
4 Pek. Pintu Kayu Swing (1 unit)
- Pek. Kusen Kayu Kamper Oven 5/15 m1
- Pek. Daun Pintu Kayu Kamper Oven + Kaca tebal 8 mm Sandblast m2
- Pek. Pasangan Engsel Pintu Setara Dekson bh
- Pek. Pasangan Kunci Pintu Setara Dekson bh
- Pek. Pasangan Handel Pintu Setara Dekson bh
- Pek. Pasangan Door Stoper Setara Dekson bh
- Pek. Finishing Kusen m1
- Pek. Finishing Daun Pintu m2
5 Pek. Pintu Kayu Swing D7 (2 unit)
- Pek. Kusen Kayu Kamper Oven 5/15 m1
- Pek. Daun Pintu Kayu Kamper Oven m2
- Pek. Pasangan Engsel Pintu Setara Dekson bh
- Pek. Pasangan Kunci Pintu Setara Dekson bh
- Pek. Pasangan Handel Pintu Setara Dekson bh
- Pek. Pasangan Door Stoper Setara Dekson bh
- Pek. Finishing Kusen m1
- Pek. Finishing Daun Pintu m2
6 Pek. Pintu Aluminium Double Swing D8 (1 unit)
- Pek. Kusen Aluminium Setara YKK m1
- Pek. Daun Pintu Aluminium Setara YKK + Kaca Bening tebal 8 mm m2
- Pek. Pasangan Engsel Pintu Setara Dekson bh
- Pek. Pasangan Kunci Pintu Setara Dekson bh
7 Pek. Pintu Besi Swing D9 (1 unit)
- Pek. Frame dan Rangka Pintu Hollow m1
- Pek. Pintu Pagar Kombinasi Hollow dan Trailis Besi m2
- Pek. Pasangan Engsel Pintu bh
- Pek. Pasangan Kunci Pintu bh
8 Pek. Pintu Pagar SD1 (1 Unit)
- Pek. Frame dan Rangka Pintu Hollow m1
- Pek. Pintu Pagar Kombinasi Hollow dan Trailis Besi m2
- Pek. Finishing Cat Pintu Pagar m2
- Pek. Sliding Rel Bawah Pintu Pagar + Aksesoris m1
9 Pek. Pintu Aluminium Sliding SD2 (1 unit)
- Pek. Kusen Aluminium Setara YKK m1
- Pek. Daun Pintu Aluminium Setara YKK + Kaca Bening tebal 8 mm m2
- Pek. Pasangan Kunci Pintu Setara Dekson bh
- Pek. Pasangan Handel Setara Dekson bh
- Pek. Sliding Rel m1
10 Pek. Pintu Aluminim Folding FD1 (1 Unit)
- Pek. Kusen Aluminium Setara YKK m1
- Pek. Daun Pintu Aluminium Setara YKK + Kaca Bening tebal 8 mm m2
- Pek. Pasangan Engsel Pintu Setara Dekson bh
- Pek. Pasangan Kunci Pintu Setara Dekson bh
- Pek. Folding Rel m1
11 Pek. Jendela Kayu (1 unit)
- Pek. Kusen Kayu Kamper Oven 5/15 m1
- Pek. Daun Jendela Kayu Kamper + Kaca Bening tebal 8 mm m2
- Pek. Pasangan Engsel Setara Dekson bh
- Pek. Pasangan Lamskar Setara Dekson set
- Pek. Pasangan Grendel Setara Dekson bh
12 Pek. Jendela Aluminium W2 (1 unit)
- Pek. Kusen Aluminium Setara YKK m1
- Pek. Daun Jendela Aluminium Setara YKK + Kaca Bening tebal 8 mm m2
- Pek. Kaca Bening tebal 8 mm m2
- Pek. Pasangan Engsel Setara Dekson bh
- Pek. Pasangan Lamskar Setara Dekson set
- Pek. Pasangan Grendel Setara Dekson bh
13 Pek. Jendela Aluminium W3 (1 unit)
- Pek. Kusen Aluminium Setara YKK m1
- Pek. Kaca Bening tebal 8 mm m2
14 Pek. Jendela Aluminium W4 (1 unit)
- Pek. Kusen Aluminium Setara YKK m1
- Pek. Kaca Bening tebal 8 mm m2
15 Pek. Pintu Kaca GD1 (1 Unit)
- Pek. Kaca Tempereed 10 mm m2
- Pek. Pasangan Engsel Kaca Setara Dekson bh
- Pek. Pasangan Handel Pintu Setara Dekson bh

F PEKERJAAN FINISHING

Pek. Finishing dinding


Pek. Pengecatan dinding dulux interior m2
Pek. Pengecatan dinding dulux weathershield m2
lisplank beton
Pek. Pemasangan keramik Bathroom Granito 30x60 cm m2
Pek. Pemasangan keramik Kitchen Granito 30x60 cm m2
diatas kitchen
Pek. Pemasangan plint keramik Granito 10x60 cm m'

Pek. Pemasangan Batu Alam Palimanan Dinding Garden & Service Room m2
area bawa deck
Pek Coating natural Batu Alam Palimanan m2
Pek. Pas. Dinding Grill Kayu m2
Pek. Pas. Dinding Panel Kayu m2
Pek. Pas. Partisi Kisi-Kisi Kayu m2
Pek Coating natural Panel dan grill kayu m2
Pek. Pemasangan Dinding Roster m2
Pek. Waterproofing Dinding Kamar Mandi Semen Base Setara Sika Top Seal m2

Pek. Finishing lantai


Pek. Lantai Keramik Granito 60x60 m2
Pek. Lantai Keramik Granito 60x60 matt area Bathroom m2
Pek. Lantai Keramik Granito 60x60 matt area Tangga m2
Pek. Pemasangan lantai decking pvc motiv kayu m2
Pemasangan Railing Hollow Galvanis, Top Kayu Kamper m'

Pek. Finishing ceiling


Pek. Plafond Gypsum 9 mm Rangka Hollow 40x40 dan 20x40 mm Setara Jayaboard m2
Pek. Pemasangan Shadowline m'
Pek. Pengecatan plafond m2
Pek. Pemasangan Drop Gorden m'
Pek. Pemasangan Plafond PVC Motif Kayu m2

Pek. Atap & Canopy


Pek. Canopy Rangka Hollow Galvanis + Atap Trimdek Trasparant m2

G PEKERJAAN SANITAIR

KAMAR MANDI UTAMA


1 Pek. Pas. Closet Duduk America Standart + Ass Setara America Standart bh
- Pek. Pas. Jet Washer + Ass Setara Setara America Standart bh
2 Pek. Pas. ShowerONDA + Ass Setara ONDA bh
3 Pek. Pas. Floor Drain ONDA bh

H PEKERJAAN MEP LANTAI SATU

H PEKERJAAN PLUMBING
1 Pemasangan dan Pengadaan Water Booster Shimitzhu unit
2 Pekerjaan Septicktank
- Pekerjaan Galian Tanah m3
- Pekerjaan Lantai kerja tebal 5 cm m3
- Pek. Pas. Batu Bata Merah (5x11x22)cm Tebal 1/2 Batu (1 PC : 4 S ) m2
- Pekerjaan Pelat Lantai 10 cm
Pek. Beton Site Mix m3
Pek. Begesting m2

Wiremesh M8 - 1 layers m2
- Pekerjaan Pelat Dinding Tebal 10 cm
Pek. Beton Site Mix m3
Pek. Begesting m2

Wiremesh M8 - 2 layers m2
- Pekerjaan Pelat Tutup Tebal 10 cm
Pek. Beton Site Mix m3
Pek. Begesting m2

Wiremesh M8 - 2 layers m2
3 Pekerjaan Tandon Air unit
- Volume 1300 Liter
4 Pekerjaan Sumur Resapan unit
5 Pekerjaan Instalasi Pipa Air Bersih dan Air Panas
- Pipa PVC AW 1 1/4 inch Setara Rucika Brand m1
- Pipa PVC AW 1 inch Setara Rucika Brand m1
- Pipa PVC AW 3/4 inch Setara Rucika Brand m1
- Pipa PVC AW 1/2 inch Setara Rucika Brand m1
- Aksesoris pipa dan Material Pendukung Setara Rucika Brand ls
- Kran Air Taman Wasser brand unit
6 Pekerjaan Instalasi Pipa Air Kotor
- Pipa PVC AW 3/4 Inch Setara Rucika Brand (Drain AC) m1
- Pipa PVC AW 4 Inch Setara Rucika Brand m1
- Pipa PVC AW 3 Inch Setara Rucika Brand m1
- Pipa PVC AW 2 Inch Setara Rucika Brand m1
- Aksesoris pipa clas AW dan Material Pendukung Setara Rucika Brand ls
7 Pekerjaan Instalasi Pipa Air Hujan
- Pipa PVC AW 6 Inch Setara Rucika Brand m1
- Pipa PVC AW 4 Inch Setara Rucika Brand m1
- Pipa PVC AW 3 Inch Setara Rucika Brand m1
- Aksesoris pipa clas AW dan Material Pendukung Setara Rucika Brand ls

I PEKERJAAN MEKANIKAL

1 Pek. Pas. Air Conditioner


- Pek. AC Split 1 PK Daikin unit
- Pek. Pipa Refrigerant m'
2 Exhaust Fan Bathroom ex. Panasonic unit

II.3.C PEKERJAAN ELEKTRIKAL

Pekerjaan Instalasi Listrik


1 Instalasi kabel Lampu, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20 mm. titik
2 Instalasi kabel Stop Kontak, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20mm. titik
3 Instalasi kabel Saklar, NYM 3x2,5 mm2 Setara Supreme dalam konduit Clipsal 20mm. titik
4 Instalasi kabel AC, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20 mm. titik
5 Instalasi kabel Data, Telephone & TV, Setara Supreme dalam konduit Clipsal 20mm. titik

Note : Harga diatas termasuk tarikan kabel, fitting dan pemasangan


Aksesoris Listrik
6 Pengadaan dan Pemasangan Panel MDP Setara Schneider Brand unit
7 Pekerjaan Kabel NYY 4x35 mm Setara Supreme + BC 10 mm (dari KWH Meter ke Panel MDP) m1
8 Pekerjaan Kabel NYY 3x25 mm Setara Supreme + BC 10 mm (dari Panel MDP ke Panel SDP) m1
9 Pekerjaan Kabel Grounding/BC Standard 1x25 mm m1
10 Pemasangan Stick Rod Grounding titik
11 Outdoor Lamp Local Brand bh
12 Spot Light 5 Watt Local Brand bh
13 Rumah Lampu Downlight 4'' + Downlight LED Bulb 13 watt ex. Philips bh
14 Led Outbow 13 Watt Local Brand bh
15 Downlight PAR30 Double Fitting 10 Watt Local Brand bh
16 Hanging Light 4x12 48 Watt Local Brand bh
17 Hanging Light 8 Watt Local Brand bh
18 LED Strip 7 Watt m1
19 Saklar Tunggal ex. Panasonic bh
20 Saklar Double ex. Panasonic bh
21 Saklar Triple ex. Panasonic bh
22 Saklar Hotel Single ex. Panasonic bh
23 Saklar Hotel Double ex. Panasonic bh
24 Saklar Hotel Triple ex. Panasonic bh
25 Stop Kontak ex. Panasonic bh
26 Stop Kontak Kabel Data ex. Panasonic bh
27 Stop Kontak Kabel TV ex. Panasonic bh
28 Stop Kontak AC ex. Panasonic bh
TINGGI LEBAR PANJANG TEBAL JUMLAH LUAS VOLUME MINUS
VOLUME
m' m' m' m' unit M2 M3

1.00
34.23 5.75 11.37
1.00
1.00
1.00
1.00
78.02 5.75 13.57
1.00
1.00
1.00
5.75 5.75

54.52 0.80 1.00 68.15


67.50 2.00 1.50 1.50 15.00

18.17 1/3 Dari pekerjaan Galian 18.17


22.50 1/3 Dari pekerjaan Galian 22.50
35.96 35.96
0.60 59.94 35.96

1.69 1.50 1.50 0.05 15.00 33.75 1.69


3.41 1.00 68.15 0.05 68.15 3.41

13.63 1.00 68.15 0.20 13.63


46.85 1.25 0.55 68.15 46.85

1.01 1.50 1.50 0.03 15.00


3.00 0.05 59.94

67.36
59.94

158.66 4.00 39.67 158.66

319.79 2.00 158.66


0.40 6.17 2.47

298.92 2.00 158.66


18.40

3.75 1.00 1.00 0.25 15.00 3.75


21.60 1.00 1.00 0.36 15.00 21.60
439.88
Berat /m' Panjang besi Jumlah Besi
219.94 1.041 1.76 8.00
219.94 1.041 1.76 8.00
439.88

1.76 2.00 0.14 0.42 15.00 1.76


33.60 2.00 0.14 0.42 15.00 2.24 33.60
684.24
Berat /m' Panjang besi Jumlah Besi Jumlah Kolom
359.52 1.577 3.80 4.00 15.00
210.66 0.616 3.80 6.00 15.00
114.06 0.394 1.13 17.00 15.00
684.24

3.07 0.30 0.15 68.15 3.07


49.06 0.36 68.15 49.06
955.92
Berat /m' Panjang besi Jumlah Besi
762.03 1.577 80.51 6.00
193.89 0.394 0.90 547.00
955.92

0.24 4.00 0.10 0.10 6.00 0.24


7.20 4.00 0.15 6.00 7.20
91.46
Berat /m' Panjang besi Jumlah Besi Jumlah kolom
64.88 0.616 4.39 4.00 6.00
26.58 0.394 0.54 21.00 6.00
91.46
5.99 0.10 59.94 5.99
5.21 0.15 34.7 5.205
Berat /m2 Panjang layers Lebar Luas
59.94 1.00 59.94

3.53 4.00 0.14 0.42 15.00 3.53


67.20 4.00 0.14 0.42 15.00 67.20
1,055.25
Berat /m' Panjang besi Jumlah Besi Jumlah Kolom
525.77 1.577 5.56 4.00 15.00
308.07 0.616 5.56 6.00 15.00
221.41 0.394 1.13 33.00 15.00
1,055.25

0.39 4.40 0.14 0.32 2.00 0.39


10.91 4.40 0.30 0.32 2.00 10.91
100.94
Berat /m' Panjang besi Jumlah Besi Jumlah Kolom
62.47 1.577 4.95 4.00 2.00
12.20 0.616 4.95 2.00 2.00
26.27 0.394 0.92 36.20 2.00
100.94

1.61
0.20 0.25 0.875 20.00 0.44
0.12 0.875 9.87 1.04
0.12 0.65 1.75 0.14

13.28
0.20 0.25 0.875 20.00 3.50
0.15 0.875 9.87 8.64
0.15 0.65 1.75 1.14

550.00
Berat /m' Panjang besi Sisi Jumlah Besi unit
404.78 1.041 14.95 2.00 13.00
50.77 0.616 0.59 7.00 20.00
79.82 0.394 1.04 194.00
535.36

Berat /m' Panjang besi sisi Jumlah Besi


14.64 0.616 1.98 2.00 6.00

0.30 0.20 0.11 13.60 0.30


6.94 0.20 0.11 13.60 6.94
73.77
Berat /m' Panjang besi Jumlah Besi
55.72 0.616 15.07 6.00
18.05 0.394 0.66 69.00
73.77

0.12 0.25 0.14 3.50 0.12


2.24 0.25 0.14 3.50 2.24
59.50
Berat /m' Panjang besi Jumlah Besi
25.22 1.041 2.69 9.00
25.22 1.041 2.69 9.00
9.06 0.394 0.79 29.00
59.50

0.12 0.61 1.95 0.10 1.00 0.12


1.19 0.61 1.95 1.00 1.19
15.67
Berat /m' Panjang besi Jumlah Besi
8.89 0.394 2.26 10.00
6.78 0.394 0.78 22.00
15.67

0.17 0.60 2.90 0.10 1.00 0.17


1.74 0.60 2.90 1.00 1.74
20.13
Berat /m' Panjang besi Jumlah Besi
10.41 0.394 3.30 8.00
9.72 0.394 0.77 32.00
20.13

2.99 0.30 0.14 71.13 2.99


52.64 0.30 0.14 71.13 52.64
925.94
Berat /m' Panjang besi Jumlah Besi
529.97 1.577 83.99 4.00
99.20 0.616 40.25 4.00
99.20 0.616 40.25 4.00
197.58 0.394 0.88 571.00
925.94

0.18 0.25 0.14 5.275 0.18


3.38 0.25 0.14 5.275 3.38
81.99
Berat /m' Panjang besi Jumlah Besi
34.12 1.041 3.64 9.00
34.12 1.041 3.64 9.00
13.74 0.394 0.79 44.00
81.99

0.19 0.22 0.11 7.80 0.19


4.29 0.22 0.11 7.80 4.29
55.99
Berat /m' Panjang besi Jumlah Besi
23.59 0.616 9.57 4.00
7.87 0.394 4.99 4.00
7.87 0.394 4.99 4.00
16.66 0.394 0.66 64.00
55.99

1.01 0.75 0.14 9.62 1.01


15.78 0.75 0.14 9.62 15.78
129.53
Berat /m' Panjang besi Jumlah Besi
71.33 0.616 11.58 10.00
58.20 0.394 1.89 78.00
129.53

0.56 0.55 0.14 7.21 0.56


8.94 0.55 0.14 7.21 8.94
77.76
Berat /m' Panjang besi Jumlah Besi
43.98 0.616 8.92 8.00
33.78 0.394 1.45 59.00
77.76

6.32 0.12 52.65 6.32


57.97 0.15 35.46 52.65 57.97
Berat /m2 Panjang layers Lebar Luas
105.30 2.00 105.30

16.90 16.90
4.43 0.75 2.95 2.00
1.00
2.00
16.90
4.43
3.20

19.95 19.95
2.21 2.45 0.90
3.00
1.00
1.00
1.00
19.95
2.21
1.40 1.65 0.85
2.00
1.00
1.00
4.35 4.35

5.60 2.40 0.80


1.92
3.00
1.00
1.00
5.60
1.92
3.00
0.34
2.00
1.00
1.00
167.60 4.00 41.90
138.58 4.00 31.85
11.18
22.42 3.80 5.90
6.21 1.50 3.50
0.96
46.69 34.19
12.50 0.45 21 12.50
21.47 4.00 4.75
2.47
21.47
29.84 29.84
1.76 1.76
2.40 2.40
34.00
6.96 3.00 2.32
22.42

45.21 45.21
2.10 1.20 1.75
8.03 21 8.03
3.60
11.77 11.77

44.835
66.75
44.84
3.375
4.975

3.15 1.75 1.80

1.00
1.00
1.00
4.00

2.00

10.20 1.70 2.00 3.00


0.30 0.05
12.00 1.50 1.50 2.50 12.00

0.38 0.10 3.75 0.38

Berat /m2 Panjang layers Lebar Luas


3.75 1.00 3.75

1.65 1.50 0.10 16.50


25.50 25.50
Berat /m2 Panjang layers Lebar Luas
33.00 2.00 16.50

0.38 0.10 3.75 0.38


3.75 3.75
Berat /m2 Panjang layers Lebar Luas
7.50 2.00 3.75
1.00

1.00

35.00
24.00
20.00
20.00
1.00
2.00

9.00 8.6
21.00
15.00
15.00

20.00
16.00
33.00
1.00

1.00
25.00
1.00

21.00
12.00
10.00
1.00
1.00
1.00
7.50
19.00
10.00
1.00
1.00
3.00
15.00

2.00

2.00
8.00

10.00

1.00
1.00
PERHITUNGAN VOLUME
Proyek : Rumah Tinggal
Jenis Pekerjaan : Pembangunan Rumah Tinggal Menengah
Lokasi Proyek

NO
URAIAN PEKERJAAN SAT

A PRELIMINARIES
1 Pekerjaan Bongkaran
Pek. Bongkaran Bangunan Eksisting m2

2 Pek. Persiapan
Pembangunan bedeng kerja ls
Pek. Bowplank dan pengukuran m'
Pek. Anggaran Listrik kerja ls
Pek. Air Kerja ls
Biaya Adminstrasi kependudukan tenaga kerja (kipem) 8 bulan ls
Pek. Mobilisasi Alat, Bahan dan Tenaga Kerja ls
Pek. Pembersihan Area Proyek m2
Pek. Bedeng Pekerja dan Gudang Bahan ls
Pek. Sanitasi Sementara untuk Pekerja ls
Pek. Pengadaan Sumur Bor Pipa PVC 5 inchi kedalaman 50 m dan Submersible Pump Shimizu ls
Pek. Pagar Proyek Sementara material seng tinggi 2 m m'

3 Pek. Peralatan
Pek. Sewa Alat-alat unit

PEKERJAAN PADA DENAH LANTAI 2


B PEKERJAAN TANAH DAN PONDASI
1 Pekerjaan Galian
Pek. Galian tanah biasa pondasi menerus m3
Pek Galian tanah pondasi pilecap m3

2 Pek. Urugan tanah


Pek. Urugan kembali tanah Pondasi menerus m3
Pek. Urugan kembali pondasi setempat m3
Pek. Urugan tanah peninggian lantai limestone + pemadatan m3

3 Pek.Urugan Pasir
Pek. Urugan Pasir Pondasi Pile Cap tebal 5 cm m3
Pek. Urugan Pasir Pondasi Menerus tebal 5 cm m3
Pek. Urugan Pasir Plat Lantai tebal 5 cm

4 Pek. Pasangan batu


Pek. Pasangan batu kosong m3
Pek. Pasangan pondasi batu kali PC 1 : 5 m3

5 Pek. lLantai kerja


Pek. Lantai Kerja Pondasi Pile Cap tebal 3 cm m3
Pek. Lantai Kerja Pelat Lantai tebal 5 cm m3

6 Pek. Lain
Pek. Semprotan Anti Rayap m2
Pek. Lapisan Plastik Polyethelene m2

C PEKERJAAN DINDING & PLESTERAN

1 Pek. Pasang dinding m2


Pek. Pas. Batu Bata Merah (5x11x22)cm Tebal 1/2 Batu (1 PC : 4 S )

2 Pek. Plesteran PC 1 : 3 m2
Pek. Plesteran dinding
area garden
3 Pek. Acian m2
Pek. Acian dinding
pasangan batu alam

D PEKERJAAN BETON

LANTAI DUA

1 Pek. Kolom Praktis (10x10) 18 unit


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4Ø10
Besi Ø8-200
Total

2 Pek. Kolom K1 (14x42) 4 unit


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4D16
Besi 6D10
Besi Ø8-100 & Besi Ø8-150
Total

3 Pek. Kolom K2 (14x32) 11 unit


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4D16
Besi 2D10
Besi Ø8-100 & Besi Ø8-150
Total

4 Pek. Balok Latei (14x20)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 6D10
Besi Ø8-200
Total

5 Pek. Balok B1 (14x30)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4D16
Besi 4D10 Tumpuan
Besi 4D10 Lapangan
Besi Ø8-100 & Besi Ø8-150
Total

6 Pek. Balok B2 (14x25)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 9D13 Tumpuan


Besi 9D13 Lapangan
Besi Ø8-100 & Besi Ø8-150
Total

7 Pek. Balok BA (11x22)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4D10
Besi 4Ø8 Tumpuan
Besi 4Ø8 Lapangan
Besi Ø8-100 & Besi Ø8-150
Total

8 Pek. Lisplank beton (14x75)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 10D10
Besi Ø8-100 & Besi Ø8-150
Total

9 Pek. Lisplank beton (14x55)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 8D10
Besi Ø8-100 & Besi Ø8-150
Total

10 Pek. Pelat Lantai Atap (t =10 cm) + waterproofing integral


Pek. Beton Site Mix m3
Pek. Begesting m2

Wiremesh M8 - 2 layers m2

11 Pek. Pelat Topian Atap (t =8 cm)


Pek. Beton Site Mix m3
Pek. Begesting m2

Wiremesh M8 - 2 layers m2
II.2.D PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pek. Pintu Kayu Double Sliding (1 unit)


- Pek. Kusen Kayu Kamper Oven 5/15 m1
- Pek. Daun Pintu Kayu Kamper Oven + Kaca tebal 8 mm m2
- Pek. Pasangan Kunci Pintu Setara Dekson bh
- Pek. Pasangan Pull Handel Pintu Custom set
- Pek. Finishing Kusen m1
- Pek. Finishing Daun Pintu m2
- Pek. Sliding Rel m1
2 Pek. Pintu Kayu Solid Swing (1 unit) + Jendela pivot (3 unit)
- Pek. Kusen Kayu Kamper Oven 5/15 m1
- Pek. Daun Pintu Kayu Kamper Oven m2
- Pek. Pasangan Engsel Pintu Setara Dekson bh
- Pek. Pasangan Kunci Pintu Setara Dekson bh
- Pek. Pasangan Handel Pintu Setara Dekson set
- Pek. Pasangan Door Stoper Setara Dekson bh
- Pek. Finishing Kusen m1
- Pek. Finishing Daun Pintu m2
- Pek. Daun Jendela Kayu Kamper + Kaca Bening tebal 8 mm m2
- Pek. Pasangan Pivot Engsel Setara Dekson bh
- Pek. Pasangan Lamskar Setara Dekson set
- Pek. Pasangan Grendel Setara Dekson bh
- Pek. Kaca Bening tebal 8 mm m2
3 Pek. Pintu Kayu Swing (3 unit)
- Pek. Kusen Kayu Kamper Oven 5/15 m1
- Pek. Daun Pintu Kayu Kamper Oven m2
- Pek. Pasangan Engsel Pintu Setara Dekson bh
- Pek. Pasangan Kunci Pintu Setara Dekson bh
- Pek. Pasangan Handel Pintu Setara Dekson bh
- Pek. Finishing Kusen m1
- Pek. Finishing Daun Pintu m2
4 Pek. Jendela Pivot (1 unit)
- Pek. Kusen Kayu Kamper Oven 5/15 m1
- Pek. Daun Jendela Kayu Kamper + Kaca Bening tebal 8 mm m2
- Pek. Pasangan Engsel Pivot Setara Dekson bh
- Pek. Pasangan Lamskar Setara Dekson set
- Pek. Pasangan Grendel Setara Dekson bh

F PEKERJAAN FINISHING

Pek. Finishing dinding


Pek. Pengecatan dinding dulux interior m2
Pek. Pengecatan dinding dulux weathershield m2
lisplank beton
Pek. Pemasangan keramik Bathroom Granito 30x60 cm m2
Pek. Pemasangan plint keramik Granito 10x60 cm m'
Pek. Pemasangan Batu Alam Palimanan Dinding Garden & Service Room m2
Pek Coating natural Batu Alam Palimanan m2
Pek. Pas. Dinding Grill Kayu m2
Pek. Pas. Dinding Panel Kayu Ulin Rangka Hollow Galvanis m2
Pek Coating natural Panel Kayu m2
Pek. Pas. Dinding Pervorated Mesh Rangka Hollow Galvanis m2
Pek. Pemasangan Dinding Roster m2
Pek. Waterproofing Dinding dan lantai Kamar Mandi Semen Base Setara Sika Top Seal m2

Pek. Finishing lantai


Pek. Lantai Keramik Granito 60x60 m2
Pek. Lantai Keramik Granito 60x60 matt area Bathroom m2
Pek. Ralling Balkon dan Void
- Pek. Handrail Kayu Bengkirai Oven m1
- Pek. Handrail Pipa Hollow Galvanish Cat Finish Propan m1
- Pek. Kaca Tempereed 10 mm + Aksesoris m2

Pek. Finishing ceiling


Pek. Plafond Gypsum 9 mm Rangka Hollow 40x40 dan 20x40 mm Setara Jayaboard m2
Pek. Pemasangan Shadowline m'
Pek. Pengecatan plafond m2
Pek. Pemasangan Drop Gorden m'

G PEKERJAAN SANITAIR

KAMAR MANDI UTAMA


1 Pek. Pas. Closet Duduk America Standart + Ass Setara America Standart bh
- Pek. Pas. Jet Washer + Ass Setara Setara America Standart bh
2 Pek. Pas. ShowerONDA + Ass Setara ONDA bh
3 Pek. Pas. Floor Drain ONDA bh

H PEKERJAAN MEP LANTAI SATU

H PEKERJAAN PLUMBING
1 Pekerjaan Instalasi Pipa Air Bersih
- Pipa PVC AW 1 1/4 inch Setara Rucika Brand m1
- Pipa PVC AW 1 inch Setara Rucika Brand m1
- Pipa PVC AW 3/4 inch Setara Rucika Brand m1
- Pipa PVC AW 1/2 inch Setara Rucika Brand m1
- Aksesoris pipa dan Material Pendukung Setara Rucika Brand ls
- Kran Air Taman Wasser brand unit
2 Pekerjaan Instalasi Pipa Air Kotor
- Pipa PVC AW 3/4 Inch Setara Rucika Brand (Drain AC) m1
- Pipa PVC AW 4 Inch Setara Rucika Brand m1
- Pipa PVC AW 3 Inch Setara Rucika Brand m1
- Pipa PVC AW 2 Inch Setara Rucika Brand m1
- Aksesoris pipa clas AW dan Material Pendukung Setara Rucika Brand ls
3 Pekerjaan Instalasi Pipa Air Hujan
- Pipa PVC AW 6 Inch Setara Rucika Brand m1
- Pipa PVC AW 4 Inch Setara Rucika Brand m1
- Pipa PVC AW 3 Inch Setara Rucika Brand m1
- Aksesoris pipa clas AW dan Material Pendukung Setara Rucika Brand ls

I PEKERJAAN MEKANIKAL

1 Pek. Pas. Air Conditioner


- Pek. AC Split 1 PK Daikin unit
- Pek. Pipa Refrigerant m'
2 Exhaust Fan Bathroom ex. Panasonic unit

II.3.C PEKERJAAN ELEKTRIKAL

Pekerjaan Instalasi Listrik


1 Instalasi kabel Lampu, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20 mm. titik
2 Instalasi kabel Stop Kontak, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20mm. titik
3 Instalasi kabel Saklar, NYM 3x2,5 mm2 Setara Supreme dalam konduit Clipsal 20mm. titik
4 Instalasi kabel AC, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20 mm. titik
5 Instalasi kabel Data, Telephone & TV, Setara Supreme dalam konduit Clipsal 20mm. titik

Note : Harga diatas termasuk tarikan kabel, fitting dan pemasangan

Aksesoris Listrik
8 Pekerjaan Kabel NYY 3x25 mm Setara Supreme + BC 10 mm (dari Panel MDP ke Panel SDP) m1
9 Pekerjaan Kabel Grounding/BC Standard 1x25 mm m1
10 Pemasangan Stick Rod Grounding titik
11 Outdoor Lamp Local Brand bh
12 Spot Light 5 Watt Local Brand bh
13 Rumah Lampu Downlight 4'' + Downlight LED Bulb 13 watt ex. Philips bh
14 Led Outbow 13 Watt Local Brand bh
15 Downlight PAR30 Double Fitting 10 Watt Local Brand bh
16 Hanging Light 4x12 48 Watt Local Brand bh
17 Hanging Light 8 Watt Local Brand bh
18 LED Strip 7 Watt m1
19 Saklar Tunggal ex. Panasonic bh
20 Saklar Double ex. Panasonic bh
21 Saklar Triple ex. Panasonic bh
22 Saklar Hotel Single ex. Panasonic bh
23 Saklar Hotel Double ex. Panasonic bh
24 Saklar Hotel Triple ex. Panasonic bh
25 Stop Kontak ex. Panasonic bh
26 Stop Kontak Kabel Data ex. Panasonic bh
27 Stop Kontak Kabel TV ex. Panasonic bh
28 Stop Kontak AC ex. Panasonic bh
TINGGI LEBAR PANJANG TEBAL JUMLAH LUAS VOLUME MINUS
VOLUME
m' m' m' m' unit M2 M3
231.43 3.80 58.32 221.60

443.19 2.00 221.60

425.71 2.00 221.60


17.48

0.68 3.80 0.10 0.10 18.00 0.68


20.52 3.80 0.15 18.00 20.52
261.10
Berat /m' Panjang besi Jumlah Besi Jumlah kolom
185.14 0.616 4.17 4.00 18.00
75.96 0.394 0.54 20.00 18.00
261.10

0.89 3.80 0.14 0.42 4.00 0.89


17.02 3.80 0.14 0.42 4.00 17.02
269.73
Berat /m' Panjang besi Jumlah Besi Jumlah Kolom
134.65 1.577 5.34 4.00 4.00
78.90 0.616 5.34 6.00 4.00
56.18 0.394 1.13 31.40 4.00
269.73

1.87 3.80 0.14 0.32 11.00 1.87


51.83 3.80 0.30 0.32 11.00 51.83
481.27
Berat /m' Panjang besi Jumlah Besi Jumlah Kolom
297.76 1.577 4.29 4.00 11.00
58.16 0.616 4.29 2.00 11.00
125.34 0.394 0.92 31.40 11.00
481.27

0.27 0.20 0.14 9.79 0.27


5.29 0.20 0.14 9.79 5.29
53.29
Berat /m' Panjang besi Jumlah Besi
40.22 0.616 10.88 6.00
13.07 0.394 0.66 49.95
53.29

0.30 0.14 71.13 2.99


0.30 0.14 71.13 52.64

Berat /m' Panjang besi Jumlah Besi


1.577 83.99 4.00
0.616 40.25 4.00
0.616 40.25 4.00
0.394 0.88 571.00

3.14 0.25 0.14 89.675 3.14


57.39 0.25 0.14 89.675 57.39
1,257.24
Berat /m' Panjang besi Jumlah Besi
516.33 1.041 55.09 9.00
516.33 1.041 55.09 9.00
224.57 0.394 0.79 719.00
1,257.24

0.26 0.22 0.11 10.71 0.26


5.89 0.22 0.11 10.71 5.89
77.33
Berat /m' Panjang besi Jumlah Besi
32.55 0.616 13.21 4.00
11.07 0.394 7.02 4.00
11.07 0.394 7.02 4.00
22.64 0.394 0.66 87.00
77.33

1.01 0.75 0.14 9.62 1.01


15.78 0.75 0.14 9.62 15.78
129.53
Berat /m' Panjang besi Jumlah Besi
71.33 0.616 11.58 10.00
58.20 0.394 1.89 78.00
129.53

0.56 0.55 0.14 7.21 0.56


8.94 0.55 0.14 7.21 8.94
77.76
Berat /m' Panjang besi Jumlah Besi
43.98 0.616 8.92 8.00
33.78 0.394 1.45 59.00
77.76

3.78 0.10 37.81


43.16 0.15 43.16 43.16
Berat /m2 Panjang layers Lebar Luas
75.61 2.00 37.81

0.32 0.08 4.00 0.32


6.09 0.15 13.9 4.00 6.09
Berat /m2 Panjang layers Lebar Luas
16.00 2.00 8.00
16.90
4.43
1.00
2.00
16.90
4.43
3.20

11.00
2.66
3.00
1.00
1.00
1.00
11.00
2.66
4.19
3.00
3.00
3.00
1.60

16.80 5.60
5.76 1.92
9.00 3.00
3.00 1.00
3.00 1.00
16.80 5.60
5.76 1.92

7.40
1.55
3.00
1.00
1.00

284.74 231.43 178.12


153.82 3.90 36.57
11.18
22.50 3.00 7.50
46.88 46.88
18.05 3.80 4.75
18.05
1.50 1.50
6.72 4.80 1.40 6.72
8.22
6.72 4.80 1.40 6.72
5.25 3.00 1.75
25.74

52.65 52.65
3.24 1.35 2.40

4.65
12.77
4.13

55.506
67.39
55.51
3.100

1.00
1.00
1.00
3.00

12.00 12.00
16.00 15.94
16.00 16.00
12.00 12.00
1.00
2.00

20.00
11.00 10.70
18.00 17.23
8.00 8.00
1.00

8.00 8.00
8.00 8.00
8.00 8.00
1.00 1.00

2.00
25.00
1.00
16.00
9.00
7.00
2.00
2.00

20.00

1.00
15.00

2.00
4.00

1.00

9.00

2.00
2.00
PERHITUNGAN VOLUME
Proyek : Rumah Tinggal
Jenis Pekerjaan : Pembangunan Rumah Tinggal Menengah
Lokasi Proyek

NO
URAIAN PEKERJAAN SAT

A PRELIMINARIES
1 Pekerjaan Bongkaran
Pek. Bongkaran Bangunan Eksisting m2

2 Pek. Persiapan
Pembangunan bedeng kerja ls
Pek. Bowplank dan pengukuran m'
Pek. Anggaran Listrik kerja ls
Pek. Air Kerja ls
Biaya Adminstrasi kependudukan tenaga kerja (kipem) 8 bulan ls
Pek. Mobilisasi Alat, Bahan dan Tenaga Kerja ls
Pek. Pembersihan Area Proyek m2
Pek. Bedeng Pekerja dan Gudang Bahan ls
Pek. Sanitasi Sementara untuk Pekerja ls
Pek. Pengadaan Sumur Bor Pipa PVC 5 inchi kedalaman 50 m dan Submersible Pump Shimizu ls
Pek. Pagar Proyek Sementara material seng tinggi 2 m m'

3 Pek. Peralatan
Pek. Sewa Alat-alat unit

PEKERJAAN PADA EXTERNAL BANGUNAN


B PEKERJAAN TANAH DAN PONDASI
1 Pekerjaan Galian
Pek. Galian tanah biasa pondasi menerus m3

2 Pek. Urugan tanah


Pek. Urugan kembali tanah Pondasi menerus m3
Pek. Urugan tanah peninggian lantai limestone + pemadatan m3
lantai 1

3 Pek.Urugan Pasir
Pek. Urugan Pasir Pondasi Menerus tebal 5 cm m3
Pek. Urugan Pasir Plat Lantai tebal 5 cm

4 Pek. Pasangan batu


Pek. Pasangan batu kosong m3
Pek. Pasangan pondasi batu kali PC 1 : 5 m3

5 Pek. lLantai kerja


Pek. Lantai Kerja Pelat Lantai tebal 5 cm m3

6 Pek. Lain
Pek. Lapisan Plastik Polyethelene m2
C PEKERJAAN DINDING & PLESTERAN

1 Pek. Pasang dinding m2


Pek. Pas. Batu Bata Merah (5x11x22)cm Tebal 1/2 Batu (1 PC : 4 S )

2 Pek. Plesteran PC 1 : 3 m2
Pek. Plesteran dinding

3 Pek. Acian m2
Pek. Acian dinding

D PEKERJAAN BETON

1 Pek. Sloof (15x20)


Pek. Beton Site Mix m3
Pek. Bekisting batako m2
Pek. Besi kg

Besi 4D10
Besi Ø8-100 & Besi Ø8-150
Total

2 Pek. Kolom Praktis (10x10)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4Ø10
Besi Ø8-200
Total

3 Pek. Pelat Lantai (t =8 cm)


Pek. Beton Site Mix m3
Pek. Begesting m2

Wiremesh M8 - 2 layers m2

E PEKERJAAN PINTU

1 Pek. Pintu Pagar SD1 (1 Unit)


- Pek. Frame dan Rangka Pintu Hollow m1
- Pek. Pintu Pagar Kombinasi Hollow, Trailis Besi & Perforated Mesh m2
- Pek. Finishing Cat Pintu Pagar m2
- Pek. Sliding Rel Bawah Pintu Pagar + Aksesoris m1

F PEKERJAAN FINISHING

Pek. Finishing dinding


Pek. Pengecatan dinding dulux weathershield m2
Pek. Lantai Keramik Granito 60x60 m2
Pek. Canopy Rangka Hollow Galvanis + Atap Trimdek m2
G PEKERJAAN SANITAIR

KAMAR MANDI UTAMA


1 Pek. Pas. Closet Duduk America Standart + Ass Setara America Standart bh
- Pek. Pas. Jet Washer + Ass Setara Setara America Standart bh
2 Pek. Pas. ShowerONDA + Ass Setara ONDA bh
3 Pek. Pas. Floor Drain ONDA bh

H PEKERJAAN MEP LANTAI SATU

H PEKERJAAN PLUMBING
1 Pemasangan dan Pengadaan Water Booster Shimitzhu unit
2 Pekerjaan Septicktank
- Pekerjaan Galian Tanah m3
- Pekerjaan Lantai kerja tebal 5 cm m3
- Pek. Pas. Batu Bata Merah (5x11x22)cm Tebal 1/2 Batu (1 PC : 4 S ) m2
- Pekerjaan Pelat Lantai 10 cm
Pek. Beton Site Mix m3
Pek. Begesting m2

Wiremesh M8 - 1 layers m2
- Pekerjaan Pelat Dinding Tebal 10 cm
Pek. Beton Site Mix m3
Pek. Begesting m2

Wiremesh M8 - 2 layers m2
- Pekerjaan Pelat Tutup Tebal 10 cm
Pek. Beton Site Mix m3
Pek. Begesting m2

Wiremesh M8 - 2 layers m2
3 Pekerjaan Tandon Air unit
- Volume 1300 Liter
4 Pekerjaan Sumur Resapan unit
5 Pekerjaan Instalasi Pipa Air Bersih dan Air Panas
- Pipa PVC AW 1 1/4 inch Setara Rucika Brand m1
- Pipa PVC AW 1 inch Setara Rucika Brand m1
- Pipa PVC AW 3/4 inch Setara Rucika Brand m1
- Pipa PVC AW 1/2 inch Setara Rucika Brand m1
- Aksesoris pipa dan Material Pendukung Setara Rucika Brand ls
- Kran Air Taman Wasser brand unit
6 Pekerjaan Instalasi Pipa Air Kotor
- Pipa PVC AW 3/4 Inch Setara Rucika Brand (Drain AC) m1
- Pipa PVC AW 4 Inch Setara Rucika Brand m1
- Pipa PVC AW 3 Inch Setara Rucika Brand m1
- Pipa PVC AW 2 Inch Setara Rucika Brand m1
- Aksesoris pipa clas AW dan Material Pendukung Setara Rucika Brand ls
7 Pekerjaan Instalasi Pipa Air Hujan
- Pipa PVC AW 6 Inch Setara Rucika Brand m1
- Pipa PVC AW 4 Inch Setara Rucika Brand m1
- Pipa PVC AW 3 Inch Setara Rucika Brand m1
- Aksesoris pipa clas AW dan Material Pendukung Setara Rucika Brand ls

I PEKERJAAN MEKANIKAL
1 Pek. Pas. Air Conditioner
- Pek. AC Split 1 PK Daikin unit
- Pek. Pipa Refrigerant m'
2 Exhaust Fan Bathroom ex. Panasonic unit

II.3.C PEKERJAAN ELEKTRIKAL

Pekerjaan Instalasi Listrik


1 Instalasi kabel Lampu, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20 mm. titik
2 Instalasi kabel Stop Kontak, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20mm. titik
3 Instalasi kabel Saklar, NYM 3x2,5 mm2 Setara Supreme dalam konduit Clipsal 20mm. titik
4 Instalasi kabel AC, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20 mm. titik
5 Instalasi kabel Data, Telephone & TV, Setara Supreme dalam konduit Clipsal 20mm. titik

Note : Harga diatas termasuk tarikan kabel, fitting dan pemasangan

Aksesoris Listrik
6 Pengadaan dan Pemasangan Panel MDP Setara Schneider Brand unit
7 Pekerjaan Kabel NYY 4x35 mm Setara Supreme + BC 10 mm (dari KWH Meter ke Panel MDP) m1
8 Pekerjaan Kabel NYY 3x25 mm Setara Supreme + BC 10 mm (dari Panel MDP ke Panel SDP) m1
9 Pekerjaan Kabel Grounding/BC Standard 1x25 mm m1
10 Pemasangan Stick Rod Grounding titik
11 Outdoor Lamp Local Brand bh
12 Spot Light 5 Watt Local Brand bh
13 Rumah Lampu Downlight 4'' + Downlight LED Bulb 13 watt ex. Philips bh
14 Led Outbow 13 Watt Local Brand bh
15 Downlight PAR30 Double Fitting 10 Watt Local Brand bh
16 Hanging Light 4x12 48 Watt Local Brand bh
17 Hanging Light 8 Watt Local Brand bh
18 LED Strip 7 Watt m1
19 Saklar Tunggal ex. Panasonic bh
20 Saklar Double ex. Panasonic bh
21 Saklar Triple ex. Panasonic bh
22 Saklar Hotel Single ex. Panasonic bh
23 Saklar Hotel Double ex. Panasonic bh
24 Saklar Hotel Triple ex. Panasonic bh
25 Stop Kontak ex. Panasonic bh
26 Stop Kontak Kabel Data ex. Panasonic bh
27 Stop Kontak Kabel TV ex. Panasonic bh
28 Stop Kontak AC ex. Panasonic bh
TINGGI LEBAR PANJANG TEBAL JUMLAH LUAS VOLUME MINUS
VOLUME
m' m' m' m' unit M2 M3

11.78 0.80 1.00 14.725

3.93 1/3 Dari pekerjaan Galian 3.93


4.15 4.15
0.30 13.85 4.15

0.74 1.00 14.73 0.05 14.73 0.74

2.95 1.00 14.73 0.20 2.95


7.69 0.95 0.55 14.73 7.69

0.74 0.05 14.73

13.85
39.02 2.65 14.73 39.02

78.04 2.00 39.02

78.04 2.00 39.02

0.44 0.20 0.15 14.73 0.44


10.60 0.36 14.73 10.60
128.52
Berat /m' Panjang besi Jumlah Besi
86.34 0.616 23.35 6.00
42.18 0.394 0.90 119.00
128.52

0.13 2.65 0.10 0.10 5.00 0.13


3.97 2.65 0.15 5.00 3.97
52.09
Berat /m' Panjang besi Jumlah Besi Jumlah kolom
36.26 0.616 2.94 4.00 5.00
15.82 0.394 0.54 15.00 5.00
52.09

1.11 0.08 13.85 1.11

Berat /m2 Panjang layers Lebar Luas


13.85 1.00 13.85

19.00
7.50
15.00
3.00

78.04 2.65 14.73


13.85 45.21
9.75 2.6 3.75
PERHITUNGAN VOLUME
Proyek : Rumah Tinggal
Jenis Pekerjaan : Pembangunan Rumah Tinggal Menengah
Lokasi Proyek

NO
URAIAN PEKERJAAN SAT

A PRELIMINARIES
1 Pekerjaan Bongkaran
Pek. Bongkaran Bangunan Eksisting m2

2 Pek. Persiapan
Pembangunan bedeng kerja ls
Pek. Bowplank dan pengukuran m'
Pek. Anggaran Listrik kerja ls
Pek. Air Kerja ls
Biaya Adminstrasi kependudukan tenaga kerja (kipem) 8 bulan ls
Pek. Mobilisasi Alat, Bahan dan Tenaga Kerja ls
Pek. Pembersihan Area Proyek m2
Pek. Bedeng Pekerja dan Gudang Bahan ls
Pek. Sanitasi Sementara untuk Pekerja ls
Pek. Pengadaan Sumur Bor Pipa PVC 5 inchi kedalaman 50 m dan Submersible Pump Shimizu ls
Pek. Pagar Proyek Sementara material seng tinggi 2 m m'

3 Pek. Peralatan
Pek. Sewa Alat-alat unit

PEKERJAAN PADA DENAH LANTAI ATAP


B PEKERJAAN TANAH DAN PONDASI
1 Pekerjaan Galian
Pek. Galian tanah biasa pondasi menerus m3
Pek Galian tanah pondasi pilecap m3

2 Pek. Urugan tanah


Pek. Urugan kembali tanah Pondasi menerus m3
Pek. Urugan kembali pondasi setempat m3
Pek. Urugan tanah peninggian lantai limestone + pemadatan m3

3 Pek.Urugan Pasir
Pek. Urugan Pasir Pondasi Pile Cap tebal 5 cm m3
Pek. Urugan Pasir Pondasi Menerus tebal 5 cm m3
Pek. Urugan Pasir Plat Lantai tebal 5 cm

4 Pek. Pasangan batu


Pek. Pasangan batu kosong m3
Pek. Pasangan pondasi batu kali PC 1 : 5 m3

5 Pek. lLantai kerja


Pek. Lantai Kerja Pondasi Pile Cap tebal 3 cm m3
Pek. Lantai Kerja Pelat Lantai tebal 5 cm m3

6 Pek. Lain
Pek. Semprotan Anti Rayap m2
Pek. Lapisan Plastik Polyethelene m2

C PEKERJAAN DINDING & PLESTERAN

1 Pek. Pasang dinding m2


Pek. Pas. Batu Bata Merah (5x11x22)cm Tebal 1/2 Batu (1 PC : 4 S )

2 Pek. Plesteran PC 1 : 3 m2
Pek. Plesteran dinding

3 Pek. Acian m2
Pek. Acian dinding

D PEKERJAAN BETON

LANTAI ATAP

1 Pek. Kolom Praktis (10x10) 12 unit


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 4Ø10
Besi Ø8-200
Total

2 Pek. Balok BG (15x20)


Pek. Beton Site Mix m3
Pek. Bekisting m2
Pek. Besi kg

Besi 8Ø8
Besi Ø8-100 & Besi Ø8-150
Total

E PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP

1 Pek. Rangka Atap Baja Ringan Canal C75 m2


2 Pek. Penutup Atap Trimdek Berpasir m2
3 Pek. Bubungan Trimdek Berpasir m1
4 Pek. Lisplank Atap Material Kayu Kamper m1

F PEKERJAAN FINISHING

Pek. Finishing
1 Pek. Floor Screeding Pelat Atap m2
2 Pek. Acian Pelat Atap m2
3 Pek. Finish Cat Exterior Setara Dulux WeatherShield m2
4 Pek. Waterproofing Semen Base Pelat Atap Setara Sika Top Seal 107 m2

G PEKERJAAN SANITAIR
KAMAR MANDI UTAMA
1 Pek. Pas. Closet Duduk America Standart + Ass Setara America Standart bh
- Pek. Pas. Jet Washer + Ass Setara Setara America Standart bh
2 Pek. Pas. ShowerONDA + Ass Setara ONDA bh
3 Pek. Pas. Floor Drain ONDA bh

H PEKERJAAN MEP LANTAI SATU

H PEKERJAAN PLUMBING
1 Pekerjaan Instalasi Pipa Air Bersih
- Pipa PVC AW 1 1/4 inch Setara Rucika Brand m1
- Aksesoris pipa dan Material Pendukung Setara Rucika Brand ls
2 Pekerjaan Instalasi Pipa Air Hujan
- Pipa PVC AW 4 Inch Setara Rucika Brand m1
- Pipa PVC AW 3 Inch Setara Rucika Brand m1
- Aksesoris pipa clas AW dan Material Pendukung Setara Rucika Brand ls
- Roof drain Wasser brand pcs

I PEKERJAAN MEKANIKAL

1 Pek. Penangkal Petir


- Lightning Protection Konvensional unit
- Upper Terminal Kit unit
- Down Conductor NYY 70 MM2 + Pipa Conduit m1
- Grounding System Max. 5 Ohms ls
- Control Box ls

II.3.C PEKERJAAN ELEKTRIKAL

Pekerjaan Instalasi Listrik


1 Instalasi kabel Lampu, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20 mm. titik
2 Instalasi kabel Stop Kontak, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20mm. titik
3 Instalasi kabel Saklar, NYM 3x2,5 mm2 Setara Supreme dalam konduit Clipsal 20mm. titik
4 Instalasi kabel AC, NYM 3x2.5 mm2 Setara Supreme dalam Konduit Clipsal 20 mm. titik
5 Instalasi kabel Data, Telephone & TV, Setara Supreme dalam konduit Clipsal 20mm. titik

Note : Harga diatas termasuk tarikan kabel, fitting dan pemasangan

Aksesoris Listrik
8 Pekerjaan Kabel NYY 3x25 mm Setara Supreme + BC 10 mm (dari Panel MDP ke Panel SDP) m1
9 Pekerjaan Kabel Grounding/BC Standard 1x25 mm m1
10 Pemasangan Stick Rod Grounding titik
11 Outdoor Lamp Local Brand bh
12 Spot Light 5 Watt Local Brand bh
13 Rumah Lampu Downlight 4'' + Downlight LED Bulb 13 watt ex. Philips bh
14 Led Outbow 13 Watt Local Brand bh
15 Downlight PAR30 Double Fitting 10 Watt Local Brand bh
16 Hanging Light 4x12 48 Watt Local Brand bh
17 Hanging Light 8 Watt Local Brand bh
18 LED Strip 7 Watt m1
19 Saklar Tunggal ex. Panasonic bh
20 Saklar Double ex. Panasonic bh
21 Saklar Triple ex. Panasonic bh
22 Saklar Hotel Single ex. Panasonic bh
23 Saklar Hotel Double ex. Panasonic bh
24 Saklar Hotel Triple ex. Panasonic bh
25 Stop Kontak ex. Panasonic bh
26 Stop Kontak Kabel Data ex. Panasonic bh
27 Stop Kontak Kabel TV ex. Panasonic bh
28 Stop Kontak AC ex. Panasonic bh
TINGGI LEBAR PANJANG TEBAL JUMLAH LUAS VOLUME MINUS
VOLUME
m' m' m' m' unit M2 M3
18.74 0.80 18.80 15.04

18.74 1.00 15.04

18.74 1.00 15.04

0.10 0.80 0.10 0.10 12.00 0.10


2.88 0.80 0.15 12.00 2.88
41.14
Berat /m' Panjang besi Jumlah Besi Jumlah kolom
28.48 0.616 0.96 4.00 12.00
12.66 0.394 0.54 5.00 12.00
41.14

0.43 0.21 0.11 18.80 0.43


9.96 0.21 0.11 18.80 9.96
109.32
Berat /m' Panjang besi Jumlah Besi
69.76 0.394 22.11 8.00
39.56 0.394 0.66 152.00
109.32

31.00
40.12
5.75
25.00

43.16
43.16
18.74
43.16
8.00
1.00

20.00
20.00
1.00
4.00

1.00
1.00
50.00
1.00
1.00

1.00
1.00

Anda mungkin juga menyukai