Anda di halaman 1dari 224

DAFTAR HARGA SATUAN BAHAN

TAHUN 2019

A. Harga Satuan Bahan

HARGA SATUAN
NO NAMA BARANG SAT. Keterangan
2020 (Rp)

1 2 3 4 #REF!

BATU KALI DAN BATU ALAM


1 Batu Kali/batu bulat 15-30 cm m3
2 Batu Belah 1.0-5.0 cm m3
3 Batu Pecah Besar 15/30 cm m3
4 Batu Pecah 5/7 cm m3
5 Batu Pecah 3/5 cm m3
6 Batu Pecah 3-4 cm m3
7 m3
8 Batu Pecah Mesin 1 - 2 cm m3
9 Batu Pecah 2-3 cm m3
10 Batu Pecah 1 - 2 cm m3
11 Batu Pecah 0,5 - 1 Cm m3
12 Batu Alam Andesit Bintik Bakar 40 x 40 m2
13 Batu Alam Andesit Alur m2
14 Batu Alam Live Grendia m2
15 Batu Candi m2
16 Batu Candi Hitam (Ukuran 30 x 30 x 2 Cm) Cirebon m2
17 Batu Candi Hitam (Ukuran 30 x 30 x 3 Cm) Cirebon m2
18 Batu Candi Hitam (Ukuran 30 x 30 x 5 Cm) Cirebon m2
19 Batu Candi Hitam (Ukuran 20 x 20 x 2 Cm) Cirebon m2
20 Batu Candi Hitam (Ukuran 20 x 30 x 5 Cm) Cirebon m2
21 Batu Putih Jogya / Palimanan (30 x 30 x 2 Cm) m2
22 Batu Putih Jogya / Palimanan (30 x 30 x 3 Cm) m2
23 Batu Putih Jogya / Palimanan (30 x 30 x 5 Cm) m2
24 Batu Alam Palimanan Putih Super m2
25 Batu hitam Jember 5 x 20 halus m2
26 Batu hitam Jember 20 x 40 halus m2
27 Batu hitam Jember 15 x 30 halus m2
28 Batu hitam Singaraja 15 x 30 halus m2
29 Batu hitam Singaraja 20 x 40 halus m2
30 Batu hitam karangasem/Batu Tabas (20 x 40 x 3) m2
31 Paras Silakarang Tipis (Ukuran 15 x 30 x 5 Cm) m2
32 Paras Silakarang Tebal (Ukuran 15 x 30 x 8 Cm) m2
33 Batu Paras Bali/Pawon (Abu - Abu Terang) m2
34 Paras Kelating / Kerobokan (Ukuran 3 x 20 x 40 Cm) bh
35 Batu pilah m2
36 Batu pilah Singaraja 30 x 30 m2
37 Batu pilah Singaraja 20 x 20 m2
38 Split Kasar m3
39 Split Halus m3
40 Koral Beton diameter 1 - 2 cm m3
41 Batu Sikat Hitam Lokal Super kampil
42 Batu Sikat Akik Merah kampil
43 Batu Sikat Putih Salju kampil
44 Koral Sikat (Lokal) sak
45 Kerikil m3
46 Kerikil Beton m3
47 Kerikil Halus m3
48 Pasir Halus m3
49 Pasir Pasang m3
50 Pasir Cor m3
51 Pasir Urug m3
52 Tanah Urug m3
53 Tanah Urug Pilihan
54 Tanah Lempung m3
55 Sirtu m3
56 Batu Karang Bukit m3
57 Limestone m3
58 Abu Bata
59 Batako Lubang bh
60 Batako Buntu bh
61 Batu Bata bh
62 Bata Ringan setara falcon uk. 75 x 200 x 500 mm m3
63 Bata Ringan setara falcon uk. 100 x 200 x 600 mm m3
64 Bata Ringan setara falcon uk. 125 x 200 x 600 mm m3
65 Bata Ringan setara falcon uk. 150 x 200 x 600 mm m3
66 Bata Merah Klas I bh
67 Bata Merah Klas II bh
68 Bata Merah Klas III bh
69 Bata Merah Super (Pripian) ex tulikup bh
70 Bata Pres 22x10x6cm bh
71 Bata Pres 22x10x5cm bh
72 Batu Gosok bh
73 Filler kg
74 Additive liter
75 Agregat m3
76 Closeter bh
77 Lis Batu Alam L=7, T=40 bh
78 Lem Batu Alam kaleng
79 Coating (CP.27) kaleng
SEMEN
80 PC. Tiga Roda 50 Kg sak
81 PC Tiga Roda 40 Kg sak
82 PC. Tonasa 50 Kg / Busoa 50 Kg sak
83 PC. Gresik 40 Kg sak
84 PC. Gresik 50 Kg sak
85 PC Rajawali 40 Kg sak
86 PC Holcim 40 Kg sak
87 PC Conch 40 Kg sak
88 Semen Gresik kg
89 Semen Tiga Roda kg
90 Semen Tonasa kg
91 Semen Bosowa kg
92 Semen Holcim kg
93 Semen Conch kg
94 Semen Warna MU 408/ Nat kg
95 Semen Tipe V kg
96 Semen Portland kg

Mortar Utama
97 ThinBedMAX/Perekat Bata Ringan (MU 380) @40 Kg sak
98 PlasterPlus/Pas. Bata & Plester (MU-301) @40 kg sak
99 Plester premium (MU-100)@ 40 kg sak
100 Finish Plesteran/ Render (MU 290)@ 40 kg sak
101 SkimWall/Acian Plesteran & Beton (Skimcoat) 20 kg (MU-200) sak
102 SkimWall/Acian Plesteran & Beton (Skimcoat) 40 kg (MU-200) sak
103 Acian Putih (MU-270)@25 kg sak
104 Perata Lantai (MU-440)@40kg sak
105 Perata Lantai Expose (MU 445) 40 kg sak
106 Self Leveling Floor /Underlayment (MU-410) @25kg sak
107 Primer Self Leveling Floor (MU-L410) @ 5lt Set
108 Floor Hardener (MU 700) 25 kg sak
109 Granitfix/Perekat Granite Tile & Batu Alam (MU-400) @25kg sak
110 Cerafix/Perekat Keramik (MU-420)@25 kg sak
111 Poolfix White/Perekat keramik area terendam (MU-460)@25 kg sak
112 Renofix/Perekat keramik diatas keramik (MU-480)@25 kg sak
113 Powerfix Flex/Perekat keramik serba guna (MU-485)@25 kg sak
114 Rapidfix Flex/Perekat keramik Fast Setting (MU-490)@25 kg sak
115 Colorfill/ Pengisi nat interior & eksterior (MU-408C) kg
116 ColorPlus/Pengisi nat interior,eksterior,area basah(MU-408P) kg
117 Glliter/Pengisi nat dengan efek Glliter (MU-408G)@ 2kg set
118 PowerPool/Pengisi nat area terendam(MU-408PP)@2kg set
119 FixGrout/Perbaikan struktur beton (MU-800)@20kg sak
120 PatchCrete/Perbaikan permukaan beton(MU-830)@40kg sak
121 SkimRep/Perbaikan permukaan acian(MU-840)@25kg sak
122 DryShield/Pelapis kedap air (MU-600)@3kg set
123 ArcyBond/Perekat Mortar & Beton akrilik (MU-L500)@900ml set

Uzin
124 Beton Instan (UZ K300) 50 kg sak
125 Plester dinding instan (UZ Plester) 50 Kg sak
126 Plester Finish tanpa Aci (UZ Render) 50 kg sak
127 Acian diatas beton (UZ SC100) 40 kg sak
128 Acian dinding instan interior (UZ SC 50) 40 kg sak
129 Acian dinding instan eksterior (UZ SC 75) 40 kg sak
130 Perekat Bata Ringan (UZ TB20) 50 kg sak

Bostik
Perekat Keramik & Batu Alam
131 Fix Crete 25kg sak
132 Fix all 20kg sak
133 Super Fix all 20kg sak
134 Super Fix all trade/white 20kg sak
135 Asaflex 45 kg (15lt +30 kgp) set
136 Mortar Fix 100kg set
137 Mortar Fix 50 kg set
138 Mortar Fix 5 kg set
139 Renofix 25 kg Zak
140 Grout ( Semen Nat) 20 kg sak
141 Grout ( Semen Nat) 1 kg sak
142 Liquid Grout Adictive (LGA) 20 Lt pail
143 Mega Lastic Acrilic Base 20Lt pail

Wall System
144 Skim Plas 25 Kg sak
145 Skim Crete 25 Kg sak
146 Fix. Plas 40 kg sak
147 Fix T. 40 kg sak

Waterproofing
148 Ultra Coat RC2 20 Lt pail
149 Boscosem Slury 33 Kg set
150 Damplix 2 20 kg set
151 Damplix 3 45 kg set
152 Damplix 3E 35 kg set
153 Boscoseal Tom (Wp membran Bakar) Uk. 1m x 10 m rol
154 Indo primer ( lapisan primer WP membran) 20 Lt pail
155 Integral Kristalisasi (Waterproofing kristal) 20 kg pail
156 Sika Top Seal Set 20 kg + cairan set

Sealent
156 No More Nail (320 GR) bh
157 Seal n Flex 1 (600 ML) bh
158 Boscosil 313 (300 ML) bh
159 Boscosil 616 (300 ML) bh
160 Fil A Gap (300 ML) bh
161 Boscosil Mastic (300 ML) khusus R. Pendingin bh
162 Bostik Z Bond 6S (300 ML) bh
163 Bostik Z PU Contrcuction (600 ML) bh
164 Quelyd Super Express (250 GR) bh
165 Expanda Foam (340 GR) bh
166 Barel Gun bh
167 Flash Band rol

BAMBU
168 Bambu Ukuran 8"- 10" panjang 4 m btg
169 Bambu Ukuran 3"-6" panjang 4 m btg
170 Gedeg kulit kelas I m2
171 Gedeg kulit kelas II m2
172 Gedeg Biasa m2

KAYU
173 Kayu jati Balok m3
174 Kayu jati papan m3
175 Kayu jati Usuk m3
176 Kayu jati Reng m3
177 Kayu merbau Balok m3
178 Kayu merbau papan m3
179 Kayu kamper balok m3
180 Kayu kamper usuk/reng m3
181 Kayu kamper papan m3
182 Kayu Profil 4/5 kamper m3
183 List Kayu m'
184 List profil 2/4 kamper m'
185 Kayu kruing balok m3
186 Kayu kruing papan m3
187 Kayu Usuk Kruing m3
188 Kayu Reng Kruing m3
189 Kayu Papan Meranti m3
190 Kayu Balok Meranti m3
191 Kayu Usuk Meranti m3
192 Kayu Reng Meranti m3
193 Kayu Bangkirai Papan m3
194 Kayu Bangkirai Balok m3
195 Kayu Begisting 5/7 m3
196 Kayu Seseh Balok m3
197 Kayu Dolken / Skapolding
198 Kayu Seseh Dolken D 20 Panjang 3 m btg
199 Kayu Seseh Dolken D 8-10 Panjang 4m btg
200 Kayu Usuk Albesia 5/7 Panjang 4 m btg
201 Kayu Reng mekanis Uk 2 x 3 x 400 cm m3
202 Kayu Reng mekanis Uk 3 x 5 x 400 cm m3
203 Kayu Usuk mekanis Uk 4 x 6 x 400 cm m3
204 Kayu Usuk mekanis Uk 5 x 7 x 400 cm m3
205 Kayu Balok mekanis Uk. 6 x 12 x 400 cm m3
206 Kayu Balok mekanis Uk. 6 x 15 x 400 cm m3
207 Kayu Balok mekanis Uk. 6 x 20 x 400 cm m3
208 Kayu Kelas III lokal m3
209 Kayu 7/7, Kelas III m3
210 Kayu Cempaka lokal m3
211 Kayu Bakar m3
212 Papan Bakesting m3
213 Papan Kayu Ulin m3
214 Papan Kayu, Kelas II m3
215 Balok Kayu Ulin m3
216 Lem Aica Aibond kg
217 Lem Kayu setara Fox ltr
218 Minyak bekisting setara Calform NX*R ltr
219 Jaro bubut bh
220 Kayu Perancah m3

Flooring/ Lantai
221 Parket Jati lokal Uk. 1,2 x 5 x 20 cm m2
222 Parket Jati lokal Uk. 1,2 x 5 x 25 cm m2
223 Parket Jati lokal Uk. 1,2 x 5 x 30 cm m2
224 Jati Eksport Uk. 1,2 x 5 x 20 cm m2
225 Jati Eksport Uk. 1,2 x 5 x 25 cm m2
226 Jati Eksport Uk. 1,2 x 5 x 30 cm m2
227 Jati Eksport Uk. 1,5 x 9 x 30 - 120 cm m2
228 Jati Eksport Uk. 1,5 x 12 x 30 - 120 cm m2
229 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 20 cm m2
230 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 30 cm m2
231 Parket Kayu Merbau Kelas I Uk. 1 x 9 x 30 - 120 cm m2
232 Parket Kayu Merbau Export Uk. 1 x 9 x 30 - 120 cm m2
233 Parket Kayu Merbau Export Uk. 1 x 9 x 60 - 120 cm m2
234 Decking Bangkirai Uk. 1,9 x 9 x 180 - 390 cm m2
235 Decking Krewing Uk. 1,9 x 9 x 180 - 400 cm m2
236 Decking Merbau Uk. 1,9 x 9 x 180 - 400 cm m2
237 Decking Ulin Sulawesi Uk. 1,9 x 9 x 200 cm m2

Lambersering
238 Lambersering Bangkirai Uk. 1 x 9 x 200 cm m2
239 Lambersering Kruing Uk. 2 x 9 x 200 cm m2

Lis Kayu
240 Lis plapond kayu mekanis Uk. 1 x 5 x 400 cm btg
241 Lis Plapond dobel kayu mekanis Uk. 1 x 5 x 400 cm btg
242 Lis Plapond Uk. 0,8 x 5 x 400 cm btg
243 Lis Plapond Uk.1 x 3 x 400 cm btg
244 Lis Plapond tanpa profil Uk. 1 x 5 x 400 cm btg
245 Lisplang kayu mekanis Uk. 2 x 6 x 400 cm btg
246 Lisplang kayu mekanis Uk. 2 x 7 x 400 cm btg
247 Lisplang kayu mekanis Uk. 2 x 8 x 400 cm btg
248 Lisplang kayu mekanis Uk. 2 x 10 x 400 cm btg
249 Lisplang kayu mekanis Uk. 2 x 12 x 400 cm btg
250 Lisplang kayu mekanis Uk. 2 x 15 x 400 cm btg
251 Lisplang kayu mekanis Uk. 2 x 20 x 400 cm btg
252 Lis Kaca Uk. 1,5 x 3 cm m'
253 Lis Dowel Kecil Uk. 1 x 2 cm m'
254 Lis Dowel Besar Uk. 1,3 x 3 cm m'
255 Lis Kusen m'

CONWOOD
Flooring/Deck Application
256 Conwood Deck 4" ( 102 x 3050 x 14 mm) Pcs
257 Conwood Deck 6" ( 152 x 3050 x 14 mm) Pcs
258 Conwood Deck 8" ( 203 x 3050 x 14 mm) Pcs
259 Conwood Deck 4" ( 102 x 3050 x 25 mm) Pcs
260 Conwood Deck 6" ( 152 x 3050 x 25 mm) Pcs
261 Conwood Deck 8" ( 203 x 3050 x 25 mm) Pcs
262 Conwood Deck 12"( 300 x 3050 x 25 mm) Pcs

Decorative Stair
263 Conwood Stair 8" (Vertical) (200 x 1200 x 16 mm) Pcs
264 Conwood Stair 12" (Horisontal) (300 x 1200 x 25 mm) Pcs
265 Conwood Handrail (85 x 3050 x 30 mm) Pcs
Ceiling Application
266 Celling Border (50 X 3050 X 11 mm) Pcs
267 Conwood Lath 3" Cut (76 x 3050 x 11 mm) Pcs
268 Conwood Lath 4" Cut (100 x 3050 x 11 mm) Pcs
269 Conwood Lath 3"(UG)(600 x 1200 x 8 mm) Pcs
270 Conwood Lath 3"(UG)(1200 x 2400 x 8 mm) Pcs

Eave/lisplank
271 Conwood Eave 2 IN 1 (235 x 3050 x 16 mm) Pcs

Wall Application
272 Conwood Lap Siding 6" BG (152 x 3050 x 11mm) Pcs
273 Conwood Lap Siding 8" GO (200 x 3050 x 11mm) Pcs
274 Conwood Decorative Panel (600 x 1200 x 11mm) Pcs
275 Conwood Decorative Panel " V-Groove" (305 x 3050 x 14mm) Pcs

Moulding Application
276 Conwood Floor Mould 4" (Louis) (102 x 3050 x 11mm) Pcs
277 Conwood Floor Mould 4" (Louis) (102 x 3050 x 14mm) Pcs
278 Conwood Floor Mould 4" (Classic) (102 x 3050 x 11mm) Pcs
279 Conwood Floor Mould 4" (Classic) (102 x 3050 x 14mm) Pcs

Decorative Application
280 Conwood Plank 1" (100 x 3050 x 25 mm) Pcs
281 Conwood Plank 2" (50 x 3050 x 16 mm) Pcs
282 Conwood Plank 2" (50 x 3050 x 25 mm) Pcs
283 Conwood Sun Shade 3" (76 x 3050 x 14 mm) Pcs
284 Conwood Fence 4" Arrow - 1M (100x 1000 x 16 mm) Pcs
285 Conwood Fence 4" Arrow - 1,5M (100x 1500 x 16 mm) Pcs
286 Conwood Fence 4" Botany - 1M (100x 1000 x 16 mm) Pcs
287 Conwood Fence 4" Botany - 1,5M (100x 1500 x 16 mm) Pcs
288 Conwood Fence 4" Classic - 1,5M (100x 1500 x 16 mm) Pcs
289 Conwood Fence 4" Branch - 1M (100x 1000 x 16 mm) Pcs

Planks
290 Conwood Plank 8" Textured (200 x 3050 x 8 mm) Pcs
291 Conwood Plank 8" Plain (200 x 3050 x 8 mm) Pcs

BESI
292 Mour + Bout bh
293 Besi strip kg
294 Besi strip 30x3 mm m'
295 Baja Strip (0,2 x 2) cm / Plat Strip Kg
296 Besi Beton U24 (Polos) Kg
297 Besi Beton Ulir U 32 Kg
298 Besi Ulir 13,0x 12 sni (Ts-40) Kg
299 Besi Ulir 16,0x 12 sni (Ts-40) kg
300 Besi Ø5 (3,8 x 6,0) btg
301 Besi Ø6 (5,0 x 12) btg
302 Besi Ø6 (5,2 x 12) btg
303 Besi Ø6 (5,7 x 12) btg
304 Besi Ø8 (6,5 x 12) btg
305 Besi Ø8 (6,7 x 12) btg
306 Besi Ø8 (6,9 x 12) SNI btg
307 Besi Ø8 (7,1 x 12) SNI btg
308 Besi Ø8 (7,4 x 12) SNI btg
309 Besi Ø8 (7,6 x 12) SNI btg
310 Besi Ø8 (7,7 x 12) SNI btg
311 Besi Ø8 (7,8 x 12) SNI btg
312 Besi Ø8 SNI U 24 btg
313 Besi Ø10 (8,4 x 12) SNI btg
314 Besi Ø10 (8,6 x 12) SNI btg
315 Besi Ø10 (8,9 x 12) SNI btg
316 Besi Ø10 (9,2 x 12) SNI btg
317 Besi Ø10 (9,4 x 12) SNI btg
318 Besi Ø10 (9,6 x 12) SNI btg
319 Besi Ø10 (9,8 x 12) SNI btg
320 Besi Ø10 SNI U 24 btg
321 Besi Ø10 Ulir (9,5 x 12) SNI btg
322 Besi Ø10 Ulir (9,7 x 12) SNI btg
323 Besi Ø12 (11,5 x 12) SNI btg
324 Besi Ø13 Ulir (11,5 x 12) SNI btg
325 Besi Ø13 Ulir (11,7 x 12) SNI btg
326 Besi Ø13 Ulir (12,0 x 12) SNI btg
327 Besi Ø13 Ulir (12,5 x 12) SNI btg
328 Besi Ø13 Ulir (12,7 x 12) SNI btg
329 Besi Ø16 Ulir (14 x 12) SNI btg
330 Besi Ø16 Ulir (14,5 x 12) SNI btg
331 Besi Ø16 Ulir (15,0 x 12) SNI btg
332 Besi Ø16 Ulir (15,5 x 12) SNI btg
333 Besi Ø16 Ulir (15,7 x 12) SNI btg
334 Wiremesh M6@50m rol
335 Wiremesh M7 (D6,5mm) Uk. 2,1 x 5,4 m lbr
336 Wiremesh M8 (D7,5mm) Uk. 2,1 x 5,4 m lbr
337 Wermes Diameter 8 (U 50) lbr
338 Beugel Besi O8 kg
339 Beugel penguat /plaat kg
340 Kawat Beton RRT kg
341 Kawat berduri m'
342 Kawat Ayak / Kuasa 5 X 5 cm m2
343 Kawat Harmonika 3 X 3 cm m2
344 Kawat Nyamuk m2
345 Kawat Jaring m2
346 Kawat Bronjong kg
347 Besi / Baja profil kg
348 Besi Baja L60 X 60 X 6 / L50 x 50 x 5 kg
349 Baja WF (150 x 12 GG) btg
350 Baja WF (200 x 12 GG) btg
351 Besi Baja WF 200 x 100 x 4,5 x 7 kg
352 Besi Baja WF 200 x 100 x 5,5x8 kg
353 Besi Baja WF 250 x 125 x 5 x 7 kg
354 Besi Baja C 100 x 50 x 3,2 kg
355 Baja Ringan Type C- 75, 0.8 m'
356 Baja Ringan Type C- 75, 0.6 m'
357 Reng Baja m'
358 Profil Canal "C" Tipe C71.075 btg
359 Profil Canal "C" Tipe C81.075 btg
360 Profil Canal "C" Tipe C81.065 btg
361 Profil "Omega / reng Tipe AA btg
362 Profil "Omega / reng Tipe A btg
363 Profil "Omega / reng Tipe AB btg
364 Profil Aluminium Kaca 3/4 m'
365 Profil Aluminium L 3 cm lis Kaca m'
366 Profil Aluminium 4" m'
367 Besi Plat kg
368 Besi plat 3 X 6 tebal 1,2 mm btg
369 Besi plat 4 X 8 tebal 1,8 mm btg
370 Baja Plat Hitam L = 10 lbr
371 Baja Plat Hitam L = 8 lbr
372 Baut Galvanis 3/4 x 2 " bh
373 Baut Galvanis 3/4 x 2 1/2 " bh
374 Baut Galvanis 3/4 x 3 " bh
375 Baut Galvanis 3/4 x 3 1/2 " bh
376 Baut Galvanis 3/4 x 4 " bh
377 Baut Galvanis 3/4 x 4 1/2 " bh
378 Baut Galvanis 3/4 x 5 " bh
379 Baut Galvanis 3/4 x 5 1/2 " bh
380 Baut Galvanis 3/4 x 6 " bh
381 Plat Siku Panjang 30 cm bh
382 Plat Siku Panjang 40 cm bh
383 Plat Siku Panjang 50 cm bh
384 Plat Siku Panjang 60 cm bh
385 Plat Aluminium 2mm m2
386 Besi siku / engsel m'
387 Besi Siku L.30.30.3 mm btg
388 Baut UNC 5/8 x 2" bh
389 Baut UNC 5/8 x 2 1/2" bh
390 Baut UNC 5/8 x 3" bh
391 Baut UNC 5/8 x 3 1/2" bh
392 Baut UNC 5/8 x 4" bh
393 Baut UNC 5/8 x 4 1/2" bh
394 Baut UNC 5/8 x 5" bh
395 Baut UNC 5/8 x 5 1/2" bh
396 Baut UNC 5/8 x 6" bh
397 Baut UNC 3/4 x 2" bh
398 Baut UNC 3/4 x 2 1/2" bh
399 Baut UNC 3/4 x 3" bh
400 Baut UNC 3/4 x 3 1/2" bh
401 Baut UNC 3/4 x 4" bh
402 Baut UNC 3/4 x 4 1/2" bh
403 Baut UNC 3/4 x 5" bh
404 Baut UNC 3/4 x 5 1/2" bh
405 Baut UNC 3/4 x 6" bh
406 Baut CB 3/8 x 5" bh
407 Baut CB 3/8 x 3" bh
408 Baut CB 3/8 x 2" bh
409 Behel 7/8 bh
410 Baut Baja A325 16 x 50 bh
411 Baut Baja A325 16 x 60 bh
412 Baut Baja A325 16 x 70 bh
413 Baut Baja A325 16 x 80 bh
414 Baut Baja A325 16 x 90 bh
415 Baut Baja A325 16 x 100 bh
416 Baut Baja A325 16 x 110 bh
417 Baut Baja A325 16 x 120 bh
418 Baut Baja A325 16 x 130 bh
419 Baut Baja A325 16 x 140 bh
420 Baut Baja A325 16 x 150 bh
421 Baut Baja A325 19 x 50 bh
422 Baut Baja A325 19 x 60 bh
423 Baut Baja A325 19 x 70 bh
424 Baut Baja A325 19 x 80 bh
425 Baut Baja A325 19 x 90 bh
426 Baut Baja A325 19 x 100 bh
427 Baut Baja A325 19 x 110 bh
428 Baut Baja A325 19 x 120 bh
429 Baut Baja A325 19 x 130 bh
430 Baut Baja A325 19 x 140 bh
431 Baut Baja A325 19 x 150 bh
432 Baut Galvanis 3/8 x 2 " bh
433 Baut Galvanis 3/8 x 2 1/2 " bh
434 Baut Galvanis 3/8 x 3 " bh
435 Baut Galvanis 3/8 x 3 1/2 " bh
436 Baut Galvanis 3/8 x 4 " bh
437 Baut Galvanis 3/8 x 4 1/2 " bh
438 Baut Galvanis 3/8 x 5 " bh
439 Baut Galvanis 3/8 x 5 1/2 " bh
440 Baut Galvanis 3/8 x 6 " bh
441 Baut Galvanis 5/8 x 2 " bh
442 Baut Galvanis 5/8 x 2 1/2 " bh
443 Baut Galvanis 5/8 x 3 " bh
444 Baut Galvanis 5/8 x 3 1/2 " bh
445 Baut Galvanis 5/8 x 4 " bh
446 Baut Galvanis 5/8 x 4 1/2 " bh
447 Baut Galvanis 5/8 x 5 " bh
448 Baut Galvanis 5/8 x 5 1/2 " bh
449 Baut Galvanis 5/8 x 6 " bh
450 Besi Pipa Galvanis lonjor
451 besi tangga D 19, enamel cat bh
452 Handle Besi Ø 12, enamel cat bh
453 Angker diameter 12mm bh
454 Skruf Fixer 5 cm bh
455 Dynabolt bh
456 Rapidrant gln
457 Sealant tube
458 Silicon kg
459 Elektrode 0,6 % bh
460 Elektrode 2 % bh

BESI PAGAR
461 Pagar Setara BRC T.90 diameter 6mm m'
462 Pagar Setara BRC T.120 diameter 6mm m'
463 Pagar Setara BRC T.150 diameter 6mm m'
464 Pagar Setara BRC T.175 diameter 7mm m'
465 Pagar Setara BRC T.190 diameter 7mm m'
466 Pagar HotDip Galvanized T.90 diameter 6mm m'
467 Pagar HotDip Galvanized T.120 diameter 6mm m'
468 Pagar HotDip Galvanized T.150 diameter 7mm m'
469 Pagar HotDip Galvanized T.175 diameter 7mm m'
470 Pagar HotDip Galvanized T.190 diameter 7mm m'

CAT
471 Cat Marka Jalan Kg
472 Glas Bit Kg
473 Cat besi kg
474 Cat Menie besi Kg
475 Cat menie Kayu kg
476 Cat Dasar Tembok Setara Emco Kg
477 Cat Setara weldon biasa Kg
478 Cat Setara weldon warna Kg
479 Cat Setara weldon warna tua Kg
480 Cat Setara emco Lux Biasa kg
481 Cat Setara emco Lux Warna kg
482 Cat Setara emco Lux Warna Tua kg
483 Cat tembok Setara Decolith kg
484 Cat tembok Setara Dulux Exterior kg
485 Cat tembok Setara Dulux Interior kg
486 Cat tembok Setara Vinilex kg
487 Cat Galvanis kg
488 Cat Kayu Emco kg
489 Cat Baja Chromate (anti karat) Kg
490 Cat Kansteen Kg
491 Kalkarium Kg
492 Kapur sirih Kg
493 Amplas lbr
494 Kuas Bh

Cat KCA
495 Cat Natural@25 kg Pail
496 Cat Flakes@25 kg Pail
497 Cat Genteng @25kg Pail

Stone Coating :
498 Clear gloss air kg
499 Black gloss air kg
500 Clear gloss solvent kg
501 Black gloss solvent kg
502 Clear doft solvent kg
503 Black doft solvent kg
504 Dempul / Plamir ltr
505 Dempul / Plamir Altik ltr
506 Dempul Impra Kayu ltr
507 Kuas untuk mengecat bh
508 Lem Fox (Rajawali Kuning) Gln
509 Lem Wall Paper Kg
510 Mild zak
511 Minyak cat ltr
512 Melamine Lack / Imfra ltr
513 Okear / Veap Kg
514 Plamir kayu kg
515 Plamir tembok setara wall Putty kg
516 Politur ultra ltr
517 Politur Jadi ltr
518 vernis ltr
519 Residu / Teer Ltr
520 Roll Buah
521 Sending Seaker ltr
522 Soda Api Kg
523 Thiner A Spesial ltr
524 Thiner B ltr
525 Teack Oil ltr
526 Wall Paper Setara Silk House m2
527 Wood Filler ltr
528 Cat Scotlight Ltr
529 Mowilex Kg

KACA
530 Bingkai Nako Silver daun
531 Bingkai Nako Coklat daun
532 Glass Block bh
533 Kaca 2 mm bening m2
534 Kaca 3 mm bening m2
535 Kaca 5 mm bening m2
536 Kaca 6 mm bening m2
537 Kaca 8 mm bening m2
538 Kaca 10 mm bening m2
539 Kaca 12 mm bening m2
540 Kaca Cermin 3 mm m2
541 Kaca Cermin 5 mm m2
542 Kaca Es/Kapur 3 mm m2
543 Kaca Es/Kapur 5 mm m2
544 Kaca Nako Bening m2
545 Kaca Nako Rayben m2
546 Kaca ryben 3 mm m2
547 Kaca ryben 5 mm m2
548 Kaca asahi tebal 3 mm polos clear m2
549 Kaca asahi tebal 3 mm ryben dark grey m2
550 Kaca asahi tebal 3 mm cermin mirror m2
551 Kaca asahi tebal 3 mm es mislet m2
552 Kaca asahi tebal 3 mm biru dark blue m2
553 Kaca asahi tebal 3 mm one way m2
554 Kaca asahi tebal 5 mm polos clear m2
555 Kaca asahi tebal 5 mm ryben dark grey m2
556 Kaca asahi tebal 5 mm cermin mirror m2
557 Kaca asahi tebal 5 mm es mislet m2
558 Kaca asahi tebal 6 mm polos clear m2
559 Kaca asahi tebal 8 mm polos clear m2
560 Kaca asahi tebal 10 mm polos clear m2
561 Kaca asahi tebal 12 mm polos clear m2
562 Kaca tempered asahimas tebal 3mm polos clear m2
563 Kaca tempered asahimas tebal 3mm ryben dark grey m2
564 Kaca tempered asahimas tebal 3mm sanergy clear m2
565 Kaca tempered asahimas tebal 4mm polos clear m2
566 Kaca tempered asahimas tebal 4mm sanergy clear m2
567 Kaca tempered asahimas tebal 5mm polos clear m2
568 Kaca tempered asahimas tebal 5mm ryben dark grey m2
569 Kaca tempered asahimas tebal 5mm stopsol m2
570 Kaca tempered asahimas tebal 5mm warna m2
571 Kaca tempered asahimas tebal 5mm sanergy clear m2
572 Kaca tempered asahimas tebal 6mm polos clear m2
573 Kaca tempered asahimas tebal 6mm ryben dark grey m2
574 Kaca tempered asahimas tebal 6mm stopsol m2
575 Kaca tempered asahimas tebal 6mm warna m2
### 576 Kaca tempered asahimas tebal 6mm diamon m2
577 Kaca tempered asahimas tebal 6mm sanergy clear m2
578 Kaca tempered asahimas tebal 8mm polos clear m2
579 Kaca tempered asahimas tebal 8mm stopsol m2
580 Kaca tempered asahimas tebal 8mm warna m2
### 581 Kaca tempered asahimas tebal 8mm diamon m2
582 Kaca tempered asahimas tebal 8mm sanergy clear m2
583 Kaca tempered asahimas tebal 10mm polos clear m2
584 Kaca tempered asahimas tebal 10mm diamon m2
585 Kaca tempered asahimas tebal 12mm polos clear m2
586 Kaca tempered asahimas tebal 12mm diamon m2
587 Kaca tempered asahimas tebal 15mm polos clear m2
588 Kaca tempered asahimas tebal 15mm diamon m2
589 Kaca tempered asahimas tebal 19mm polos clear m2
590 Kaca tempered asahimas tebal 19mm diamon m2
591 Kaca tebal 3+3 mm laminet biasa m2
592 Kaca tebal 4+4 mm laminet biasa m2
593 Kaca tebal 5+5 mm laminet biasa m2
594 Kaca tebal 6+6 mm laminet biasa m2
595 Kaca tebal 8+8 mm laminet biasa m2
596 Kaca tebal 10+10 mm laminet biasa m2
597 Kaca tebal 12+12 mm laminet biasa m2
598 Kaca tebal 3+3 mm laminet tempered m2
599 Kaca tebal 4+4 mm laminet tempered m2
600 Kaca tebal 5+5 mm laminet tempered m2
601 Kaca tebal 6+6 mm laminet tempered m2
602 Kaca tebal 8+8 mm laminet tempered m2
603 Kaca tebal 10+10 mm laminet tempered m2
604 Kaca tebal 12+12 mm laminet tempered m2
605 Ongkos polin kaca tempered tebal 5mm m'
606 Ongkos polin kaca tempered tebal 6mm m'
607 Ongkos polin kaca tempered tebal 8mm m'
608 Ongkos polin kaca tempered tebal 10mm m'
609 Ongkos polin kaca tempered tebal 12mm m'
610 Ongkos polin kaca tempered tebal 19mm m'

PIPA
611 Pipa Galvanis 1" m'
612 Pipa Galvanis 1,5 BSA m'
613 Pipa Galvanis 2" m'
614 Pipa Galvanis 3" m'
615 Pipa Maspion AW 1/2 m'
616 Pipa Maspion AW 3/4 m'
617 Pipa Maspion AW 1 m'
618 Pipa Maspion AW 1-1/2 m'
619 Pipa Maspion AW 1-1/4 m'
620 Pipa Maspion AW 2 m'
621 Pipa Maspion AW 2-1/2 m'
622 Pipa Maspion AW 3 m'
623 Pipa Maspion AW 4 m'
624 Pipa Maspion AW 5 m'
625 Pipa Maspion AW 6 m'
626 Pipa Maspion AW 8 m'
627 Pipa Maspion AW 10 m'
628 Pipa Maspion AW 12 m'
629 Pipa Maspion AW 14 m'
630 Pipa Maspion AW 16 m'
631 Pipa Maspion C 3/4 m'
632 Pipa Maspion C 5/8 m'
633 Pipa Maspion C 1 m'
634 Pipa Maspion C 1-1/2 m'
635 Pipa Maspion C 1-1/4 m'
636 Pipa Maspion C 2 m'
637 Pipa Maspion C 2-1/2 m'
638 Pipa Maspion C 3 m'
639 Pipa Maspion C 3-1/2 m'
640 Pipa Maspion C 4 m'
641 Pipa Maspion D 1/2 m'
642 Pipa Maspion D 1-1/2 m'
643 Pipa Maspion D 1-1/4 m'
644 Pipa Maspion D 2 m'
645 Pipa Maspion D 2-1/2 m'
646 Pipa Maspion D 3 m'
647 Pipa Maspion D 4 m'
648 Pipa Maspion D 5 m'
649 Pipa Maspion D 6 m'
650 Pipa Maspion D 8 m'
651 Pipa Maspion D 10 m'
652 Pipa Maspion D 12 m'
653 Pipa Maspion D 14 m'
654 Pipa Maspion D 16 m'
655 Pipa / selang spiral sel kran m'
656 Pipa langgeng warna abu - abu AW 1/2 m'
657 Pipa langgeng warna abu - abu AW 3/4 m'
658 Pipa langgeng warna abu - abu AW 1 m'
659 Pipa langgeng warna abu - abu AW 1 1/4 m'
660 Pipa langgeng warna abu - abu AW 1 1/2 m'
661 Pipa langgeng warna abu - abu AW 2 m'
662 Pipa langgeng warna abu - abu AW 2 1/2 m'
663 Pipa langgeng warna abu - abu AW 3 m'
664 Pipa langgeng warna abu - abu AW 4 m'
665 Pipa langgeng warna abu - abu AW 5 m'
666 Pipa langgeng warna abu - abu AW 6 m'
667 Pipa langgeng warna abu - abu AW 8 m'
668 Pipa langgeng warna abu - abu AW 10 m'
669 Pipa langgeng warna abu - abu AW 12 m'
670 Pipa langgeng warna abu - abu AW 16 m'
671 Pipa langgeng warna abu - abu D 1 1/4 m'
672 Pipa langgeng warna abu - abu D 1 1/2 m'
673 Pipa langgeng warna abu - abu D 2 m'
674 Pipa langgeng warna abu - abu D 2 1/2 m'
675 Pipa langgeng warna abu - abu D 3 m'
676 Pipa langgeng warna abu - abu D 4 m'
677 Pipa langgeng warna abu - abu D 5 m'
678 Pipa langgeng warna abu - abu D 6 m'
679 Pipa langgeng warna abu - abu D 8 m'
680 Pipa langgeng warna abu - abu D 10 m'
681 Pipa langgeng warna abu - abu D 12 m'
682 Pipa langgeng warna abu - abu D 14 m'
683 Pipa langgeng warna abu - abu D 16 m'
684 Pipa langgeng warna abu - abu D 20 m'
685 Pipa langgeng warna abu - abu C 5/8 m'
686 Pipa langgeng warna abu - abu C 1/2 m'
687 Pipa langgeng warna abu - abu C 3/4 m'
688 Pipa langgeng warna abu - abu C 1 m'
689 Pipa langgeng warna abu - abu C 1 1/4 m'
690 Pipa langgeng warna abu - abu C 1 1/2 m'
691 Pipa langgeng warna abu - abu C 2 m'
692 Pipa langgeng warna abu - abu C 2 1/2 m'
693 Pipa langgeng warna abu - abu C 3 m'
694 Pipa langgeng warna abu - abu C 4 m'
695 Pipa langgeng warna abu - abu C 5 m'
696 Pipa winlon warna abu - abu AW 1/2 m'
697 Pipa winlon warna abu - abu AW 3/4 m'
698 Pipa winlon warna abu - abu AW 1 m'
699 Pipa winlon warna abu - abu AW 1 1/4 m'
700 Pipa winlon warna abu - abu AW 1 1/2 m'
701 Pipa winlon warna abu - abu AW 2 m'
702 Pipa winlon warna abu - abu AW 2 1/2 m'
703 Pipa winlon warna abu - abu AW 3 m'
704 Pipa winlon warna abu - abu AW 4 m'
705 Pipa winlon warna abu - abu AW 5 m'
706 Pipa winlon warna abu - abu AW 6 m'
707 Pipa winlon warna abu - abu AW 8 m'
708 Pipa winlon warna abu - abu AW 10 m'
709 Pipa winlon warna abu - abu AW 12 m'
710 Pipa winlon warna abu - abu D 1 1/4 m'
711 Pipa winlon warna abu - abu D 1 1/2 m'
712 Pipa winlon warna abu - abu D 2 m'
713 Pipa winlon warna abu - abu D 2 1/2 m'
714 Pipa winlon warna abu - abu D 3 m'
715 Pipa winlon warna abu - abu D 4 m'
716 Pipa winlon warna abu - abu D 6 m'
717 Pipa winlon warna abu - abu D 8 m'
718 Pipa winlon warna abu - abu D 10 m'
719 Pipa winlon warna abu - abu D 12 m'
720 Pipa winlon warna abu - abu C 5/8 m'
721 Pipa winlon warna abu - abu C 1/2 m'
722 Pipa winlon warna abu - abu C 3/4 m'
723 Pipa winlon warna abu - abu C 1 m'
724 Pipa winlon warna abu - abu C 1 1/4 m'
725 Pipa winlon warna abu - abu C 1 1/2 m'
726 Pipa winlon warna abu - abu C 2 m'
727 Pipa winlon warna abu - abu C 2 1/2 m'
728 Pipa winlon warna abu - abu C 3 m'
729 Pipa winlon warna abu - abu C 4 m'
730 Pipa wavin warna putih AW 1/2 m'
731 Pipa wavin warna putih AW 3/4 m'
732 Pipa wavin warna putih AW 1 m'
733 Pipa wavin warna putih AW 1 1/4 m'
734 Pipa wavin warna putih AW 1 1/2 m'
735 Pipa wavin warna putih AW 2 m'
736 Pipa wavin warna putih AW 2 1/2 m'
737 Pipa wavin warna putih AW 3 m'
738 Pipa wavin warna putih AW 4 m'
739 Pipa wavin warna putih AW 5 m'
740 Pipa wavin warna putih AW 6 m'
741 Pipa wavin warna putih AW 8 m'
742 Pipa wavin warna putih AW 10 m'
743 Pipa wavin warna putih AW 12 m'
744 Pipa wavin warna putih D 1 1/4 m'
745 Pipa wavin warna putih D 1 1/2 m'
746 Pipa wavin warna putih D 2 m'
747 Pipa wavin warna putih D 2 1/2 m'
748 Pipa wavin warna putih D 3 m'
749 Pipa wavin warna putih D 4 m'
750 Pipa wavin warna putih D 5 m'
751 Pipa wavin warna putih D 6 m'
752 Pipa wavin warna putih D 8 m'
753 Pipa wavin warna putih D 10 m'
754 Pipa wavin warna putih D 12 m'
755 Pipa langgeng warna putih AW 1/2 m'
756 Pipa langgeng warna putih AW 3/4 m'
757 Pipa langgeng warna putih AW 1 m'
758 Pipa langgeng warna putih AW 1 1/4 m'
759 Pipa langgeng warna putih AW 1 1/2 m'
760 Pipa langgeng warna putih AW 2 m'
761 Pipa langgeng warna putih AW 2 1/2 m'
762 Pipa langgeng warna putih AW 3 m'
763 Pipa langgeng warna putih AW 4 m'
764 Pipa langgeng warna putih AW 5 m'
765 Pipa langgeng warna putih AW 6 m'
766 Pipa langgeng warna putih AW 8 m'
767 Pipa langgeng warna putih AW 10 m'
768 Pipa langgeng warna putih AW 12 m'
769 Pipa langgeng warna putih AW 14 m'
770 Pipa langgeng warna putih AW 16 m'
771 Pipa langgeng warna putih D 1 1/4 m'
772 Pipa langgeng warna putih D 1 1/2 m'
773 Pipa langgeng warna putih D 2 m'
774 Pipa langgeng warna putih D 2 1/2 m'
775 Pipa langgeng warna putih D 3 m'
776 Pipa langgeng warna putih D 4 m'
777 Pipa langgeng warna putih D 5 m'
778 Pipa langgeng warna putih D 6 m'
779 Pipa langgeng warna putih D 8 m'
780 Pipa langgeng warna putih D 10 m'
781 Pipa langgeng warna putih D 12 m'
782 Pipa langgeng warna putih D 14 m'
783 Pipa langgeng warna putih D 16 m'
784 Pipa langgeng warna putih D 20 m'
785 Pipa langgeng warna putih C 5/8 m'
786 Pipa setara warna putih C 1/2 m'
787 Pipa langgeng warna putih C 3/4 m'
788 Pipa langgeng warna putih C 1 m'
789 Pipa langgeng warna putih C 1 1/4 m'
790 Pipa langgeng warna putih C 1 1/2 m'
791 Pipa langgeng warna putih C 2 m'
792 Pipa langgeng warna putih C 2 1/2 m'
793 Pipa langgeng warna putih C 3 m'
794 Pipa langgeng warna putih C 4 m'
795 Pipa winlon warna putih AW 1/2 m'
796 Pipa winlon warna putih AW 3/4 m'
797 Pipa winlon warna putih AW 1 m'
798 Pipa winlon warna putih AW 1 1/4 m'
799 Pipa winlon warna putih AW 1 1/2 m'
800 Pipa winlon warna putih AW 2 m'
801 Pipa winlon warna putih AW 2 1/2 m'
802 Pipa winlon warna putih AW 3 m'
803 Pipa winlon warna putih AW 4 m'
804 Pipa winlon warna putih AW 5 m'
805 Pipa winlon warna putih AW 6 m'
806 Pipa winlon warna putih AW 8 m'
807 Pipa winlon warna putih AW 10 m'
808 Pipa winlon warna putih D 1 1/4 m'
809 Pipa winlon warna putih D 1 1/2 m'
810 Pipa winlon warna putih D 2 m'
811 Pipa winlon warna putih D 2 1/2 m'
812 Pipa winlon warna putih D 3 m'
813 Pipa winlon warna putih D 4 m'
814 Pipa winlon warna putih D 5 m'
815 Pipa winlon warna putih D 6 m'
816 Pipa winlon warna putih D 8 m'
817 Pipa winlon warna putih D 10 m'
818 Pipa winlon warna putih C 5/8 m'
819 Pipa winlon warna putih C 1/2 m'
820 Pipa winlon warna putih C 3/4 m'
821 Pipa winlon warna putih C 1 m'
822 Pipa winlon warna putih C 1 1/4 m'
823 Pipa winlon warna putih C 1 1/2 m'
824 Pipa winlon warna putih C 2 m'
825 Pipa winlon warna putih C 2 1/2 m'
826 Pipa winlon warna putih C 3 m'
### 827 Pipa winlon warna putih C 4 m'
828 Pipa vilano warna putih AW 1/2 m'
829 Pipa vilano warna putih AW 3/4 m'
830 Pipa vilano warna putih AW 1 m'
831 Pipa vilano warna putih AW 1 1/4 m'
832 Pipa vilano warna putih AW 3 m'
833 Pipa vilano warna putih AW 4 m'
834 Pipa vilano warna putih AW 5 m'
835 Pipa vilano warna putih AW 6 m'
836 Pipa vilano warna putih D 1 1/4 m'
837 Pipa vilano warna putih D 1 1/2 m'
838 Pipa vilano warna putih D 2 m'
839 Pipa vilano warna putih D 2 1/2 m'
840 Pipa vilano warna putih D 3 m'
841 Pipa vilano warna putih D 4 m'
842 Pipa vilano warna putih D 5 m'
843 Pipa vilano warna putih D 6 m'
844 PVC Pipe dia. 150 mm m
845 Elbow 90̊, dia 150 mm bh
846 Elbow 45, dia 150 mm bh
847 Sochet dia. 150 bh
848 shortpipe ke HI dan pipa bh
849 saddle branch bh
850 solvent cement kg
851 PVC Pipe dia. 200 mm m
852 Sochet dia. 200 bh
853 Tee dia 200 x 150 mm bh
854 Pipa PVC ( class D ) dia 150 mm m'
855 Bend dia 150, 90 (DV) bh
856 Bend dia 150, 45 (DV) bh
857 sochet dia 150 mm (DV) bh
858 Pipa PVC ( class D ) dia 4" dia 100 mm, length = 4 m m'
859 Sochet dia. 100 mm bh
860 Bend dia 100, 90 bh
861 Bend dia 100, 45 bh
862 Tee Y 45 ; 4" x 2" bh
863 Tee Y 45 ; 4" x 3" bh
864 Tee Y 45 ; 4" x 4" bh
865 Dop PVC 4" bh
866 Reducer 150 x 100 mm bh
867 Pipa PVC ( class D ) dia 3" dia. 75mm, length 4 m m
868 Large Radius Elbow dia. 75, 90o bh
869 Bend dia 75, 45 bh
870 Sochet dia. 75 mm bh
871 Dop PVC 3" bh
872 Reducer 100 x 75 mm bh
873 Pipa PVC ( class D ) dia 2" m
874 Sochet dia. 50 mm bh
875 Large Radius Elbow dia. 50, 90o bh
876 Bend dia 50, 45 bh
877 Dop PVC 2" bh
878 Pipa PVC (class D), Ø 2 1/2" (63 mm) SCJ m
879 Socket dia 63 mm bh
880 Bend dia 63, 90o bh
881 Bend dia 63, 45o bh
882 Dop PVC 1 1/2" bh
883 Pipa PVC (class D), Ø 1 1/2" (40 mm) SCJ m
884 Socket dia 40 mm bh
885 Bend dia 40, 90o bh
886 Bend dia 40, 45o bh
887 Dop PVC 1 1/2" bh
888 Pipa PVC D, Ø 1 1/4" (30 mm) SCJ m
889 Socket dia 30 mm bh
890 Bend dia 30, 90o bh
891 Bend dia 30, 45o bh
892 Dop PVC 1 1/4" bh
893 Pipa PVC D, Ø 1" (25 mm) SCJ m
894 Socket dia 25 mm bh
895 Bend dia 25, 90o bh
896 Bend dia 25, 45o bh
897 Dop PVC 1 1/4" bh
898 Tee Y; 3" x 3" bh
899 Tee Y; 3" x 2" bh
900 Tee ; 2" x 2" bh
901 Sifon Crom Leher Angsa bh
902 Pipa PVC Ø 6" M
903 Pipa PVC Ø 4" M
904 Pipa PVC Ø 3" M
905 Pipa PVC Ø 2" M
906 Pipa GI Ø 4" M
907 Pipa GI Ø 3" M
908 Pipa GI Ø 2" M
909 PVC Tee R-R Ø 10" x 3" bh
910 PVC Tee R-R Ø 6" x 4" bh
911 PVC Tee R-R Ø 6" x 3" bh
912 PVC Tee R-R Ø 4" x 4" bh
913 PVC Tee R-R Ø 4" x 3" bh
914 PVC Tee R-R Ø 3" x 3" bh
915 PVC Tee R-R Ø 2" x 3" bh
916 PVC Tee R-SC Ø 4" x 2" bh
917 PVC Tee R-SC Ø 3" x 2" bh
918 PVC Tee SC-SC Ø 2" x 2" bh
919 CI Giboult Joint Std Jis Ø 10" bh
920 CI Giboult Joint Std SII Ø 6" bh
921 CI Giboult Joint Std SII Ø 4" bh
922 CI Giboult Joint Std SII Ø 3" bh
923 CI Gate Valve FL- FL Ø 4" bh
924 CI Plat Cap Ø 4" bh
925 PVC Tapper Core Ø 4" bh
926 PVC Tapper Core Ø 3" bh
927 BS Bend FL- FL Ø 4" x 45 ̊ bh
928 BS Bend FL- FL Ø 3" x 45 ̊ bh
929 BS Flenge Ø 4" bh
930 BS Flange Ø 3" bh
931 Karet Packing Ø 4" bh
932 Karet Packing Ø 3" bh
933 Bronze Gate Valve Ø 3" bh
934 Bronze Gate Valve Ø 2" bh
935 PVC Valve Sochet Ø 3" bh
936 PVC Valve Sochet Ø 2" bh
937 GI Cap Ø 3" bh
938 GI Cap Ø 2" bh
939 GI Elbow Ø 2" bh
940 PVC Bend R- R Ø 4" x 90 ̊ bh
941 PVC Bend R- R Ø 4" x 45 ̊ bh
942 PVC Bend R- R Ø 3" x 45 ̊ bh
943 PVC Bend R- R Ø 3" x 90 ̊ bh
944 PVC Elbow Ø 2" bh
945 PVC Reducer R-R Ø 4" x 3" bh
946 PVC Reducer R-R Ø 3" x 2" bh
947 Beton Path box bh
948 Beton KS bh
949 Pipa Selubung Valve M
950 Penutup Pipa bh
951 Patok UP bh
952 Beton Penahan Ø 10" bh
953 Beton Penahan Ø 6" bh
954 Beton Penahan Ø 4" bh
955 Beton Penahan Ø 3" bh
956 Beton Penahan Ø 2" bh
957 Baut Dynabol bh

BAHAN LISTRIK
958 Coaxial cable 5C - 75 ohm commscof m1
959 Box Panel (3 mm) (400 x 600) Bh
960 Figting lampu Broco Bh
961 Inbow dos plastik clipsal E 157 P OB bj
962 Kabel NYM 2 x 1.5 mm Suprime NYM m1
963 Kabel NYY 2 x 1.5 mm m1
964 Kabel NYM 2 x 2.5 mm m1
965 Kabel NYY 3 x 1.5 mm m1
966 Kabel NYM 3 x 2.5 mm m1
967 Kabel NYY 3 x 2.5 mm m1
968 Kabel NYM 4 mm m1
969 Kabel NYY 2 x 2,5 mm m1
970 Kabel Twisteed 2 x 16 mm m1
971 Kabel telephone m1
972 Klem clipsal 20 mm bj
973 Casing Lampu Bawah Air bh
974 Casing Lampu Tangga bh
975 Kap Lampu 14 Inchi Aluminium bh
976 Fitting Gantung E27 bh
977 Lampu Son 150 Watt Setara Philips Set
978 Lampu Mercury (halaman) bh
979 Lampu Mercury 125 Watt Setara Philips Set
980 Lampu Mercury 250 Watt Setara Philips Set
981 Lampu Mercury 400 Watt Setara Philips Set
982 Lampu pijar 10 Watt Setara Philips bh
983 Lampu pijar 15 Watt Setara Philips bh
984 Lampu pijar 25 Watt Setara Philips bh
985 Lampu pijar 40 Watt Setara Philips bh
986 Lampu TL 20 Watt Komplit (Ballast Philips) bh
987 Lampu TL 25 Watt Komplit (Ballast Philips) bh
988 Lampu LED (5 Watt) Setara Philips Bh
989 Lampu LED (7 Watt) Setara Philips Bh
990 Lampu LED (10) Setara Philips Bh
991 Lampu LED (13 Watt) Setara Philips Bh
992 Lampu Sorot LED (5 Watt) Setara Philips Bh
993 Lampu Sorot LED (7 Watt) Setara Philips Bh
994 Lampu Sorot LED (10 Watt) Setara Philips Bh
995 Lampu Sorot LED (13 Watt) Setara Philips Bh
996 Lampu Sorot LED (25 Watt) Setara Philips Bh
997 Lampu Sorot LED (100 Watt) Setara Philips (ip65) Bh
998 Lampu Sorot Cahaya RGB (LED) 100 watt setara Philips (ip65) Bh
999 Lampu Sorot Bawah Cahaya Warm White (bolam) 400 watt setara Philips Bh
1000 Lampu Sorot Bawah Cahaya Warm White (LED) 10 watt setara Philips (ip65) Bh
1001 Lampu Sorot Bawah Cahaya Warm White (LED) 30 watt setara Philips (ip65) Bh
1002 Lampu Esensial (5 Watt) Setara Philips Bh
1003 Lampu Esensial (8 Watt) Setara Philips Bh
1004 Lampu Esensial (11 Watt) Setara Philips Bh
1005 Lampu Esensial (14 Watt) Setara Philips Bh
1006 Lampu Esensial (18 Watt) Setara Philips Bh
1007 Scot Light m2
1008 Magnet Contactor 80 A SN - 50 Bh
1009 MCB 3 phase 40 A MG Bh
1010 MCB 3 phase 63 A MG Bh
1011 Panel MDP Unit
1012 Panel SDP Unit
1013 Pipa clipsal 20 mm bt
1014 Pipa flexible clipsal 20 mm m1
1015 Saklar ganda Setara Broco Bh
1016 Saklar tunggal Setara Broco Bh
1017 SL 18 Watt Komplit bh
1018 Sock clipsal 20 mm bj
1019 Steker bh
1020 Stop Kontak bh
1021 Stop Kontak Khusus (Kedap Air) bh
1022 Travo max 50 watt bh
1023 Tee dos clipsal 20 mm bh
1024 Time Switch Bh
1025 T Foring Bh

MARMER / GRANIT
1026 Marmer (30 x 30) m2
1027 Marmer (40 x 40) m2
1028 Granit (30 x 30) Tekstur Kasar Tebal 3 cm m2
1029 Batu Andesit (30 x 30 x 5 cm) m2
1030 Roster Keramik (12 x 11 x 24) bh

GRANIT TILE
1031 Essenza 40 x 40 m2
1032 Essenza 60 x 60 m2
1033 Granito 40 x 40 cm m2
1034 Nero Granito 30 x 60 cm m2
1035 Nero Granito 40 x 40 cm m2
1036 Nero Granito 60 x 60 cm m2
1037 Setara Ex Cina 60 x 60 cm m2
1038 Setara Ex Cina 80 x 80 cm m2

KERAMIK
1039 Keramik Asia Tile 20 x 20 kelas I warna muda m2
1040 Keramik Setara Asia Tile 20 x 20 kelas I warna tua m2
1041 Keramik Setara Asia Tile 20 x 25 kelas I m2
1042 Keramik Setara Asia Tile 30 x 30 kelas I warna muda m2
1043 Keramik Setara Asia Tile 30 x 30 kelas I warna tua m2
1044 Keramik Setara Asia Tile 40 x 40 kelas I m2
1045 Keramik Setara Asia Tile 60 x 60 kelas I Setara Platinum m2
1046 Keramik Setara ARWANA ( warna putih) M2
1047 Keramik Setara ARWANA ( warna tua) M2
1048 Keramik Setara Diamond 10/20 cm (Warna Muda) M2
1049 Keramik Setara Diamond 20/20 cm (Kelas I Warna Muda) M2
1050 Keramik Setara Diamond 30/30 cm (Kelas I Warna Muda) M2
1051 Keramik Setara Diamond 10/20 cm (Warna tua) M2
1052 Keramik Setara Diamond 20/20 cm (Kelas I Warna Tua) M2
1053 Keramik Setara Diamond 30/30 cm (Kelas I Warna Tua) M2
1054 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna muda) M2
1055 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna tua) M2
1056 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna tua) m2
1057 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna muda) m2
1058 Keramik Setara Ikad (Keramik) Kw. I 30 x 30 cm m2
1059 Keramik Setara Ikad (Keramik) Kw. I 40 x 40 cm m2
1060 Keramik Setara Ikad (Keramik) Kw. I 50 x 50 cm m2
1061 Keramik Setara KIA 20/20 cm warna muda m2
1062 Keramik Setara KIA 30/30 cm warna muda m2
1063 Keramik Setara KIA 20/20 cm warna tua m2
1064 Keramik Setara KIA 30/30 cm warna tua m2
1065 Keramik Setara Mulia Warna Putih m2
1066 Keramik Setara Mulia Warna Tua m2
1067 Keramik Setara Mulia 20 x 20 cm Warna Tua m2
1068 Keramik Setara Mulia 20 x 20 cm Warna Muda m2
1069 Keramik Setara Mulia 30 x 30 cm Warna Putih m2
1070 Keramik Setara Mulia 30 x 30 Warna Marbel m2
1071 Keramik Setara Mulia 30 x 30 Warna Impresso m2
1072 Keramik Setara Mulia 40 x 40 cm kelas I m2
1073 Keramik Setara ROMAN 20/20 cm m2
1074 Keramik Setara ROMAN 30/30 cm m2
1075 Tegel PC abu - abu 20/20 cm m2
1076 Tegel PC Warna 20/20 cm m2
1077 Tegel PC Warna 30/30 cm m2
1078 Tegel 30 x 30 TB PC m2
1079 Tegel 30 x 30 TB PC Kuning m2
1080 Tegel 30 x 30 Warna Merah m2
1081 Tegel Bata 20 x 20 Merah m2
1082 Tegel Bata 20 x 20 PC m2
1083 Tegel B/TB 20 x 20 Kuning m2
1084 Tegel Mozaik Porselint 30/30 cm m2
1085 Tegel Wafel 20/20 cm Warna m2
1086 Ubin PC Warna bh
1087 Ubin PC Warna 20 / 20 Cm m2
1088 Batu Lahar 30/30 bh
1089 Porselint 11/11 cm bh
1090 Porselen m2

ATAP
1091 Alang-alang panjang 2,4 meter lbr
1092 Alluminium foil M2 Double rol
1093 Akustik 60 cm x 120 cm lbr
1094 Asbes Bubungan lbr
1095 Asbes Gelombang 1,80 m x 0,80 m lbr
1096 Asbes Gelombang 1,80 m x 1,05 m lbr
1097 Asbes Gelombang 2,10 m x 1,05 m lbr
1098 Asbes Gelombang 2,4 m x 1,05 m lbr
1099 Asbes Rata 2 m x 1 m x 4 mm lbr
1100 Bentala tanah liat Ex Pejaten bh
1101 Bentala Ex Kapal
1102 Bentala Besar polos Lubang 24 cm bh
1103 Bentala Besar Warna Lubang 25 cm bh
1104 Bentala Besar polos Lubang 90 cm bh
1105 Bentala Besar Warna Lubang 90 cm bh
1106 Bubungan Besar bh
1107 Bubungan Kecil bh
1108 Bubungan Bambe Kecil bh
1109 Bubungan Bulat Karang Pilang bh
1110 Bubungan Bulat Jati Wangi bh
1111 Bubungan Bulat Ngalayur isi 3,5/m bh
1112 Bubungan Besar Good Year bh
1113 Bubungan Beton Cisangkan bh
1114 Bubungan Gerard lbr
1115 Bubungan Karang Pilang isi 3,5/m bh
1116 Bubungan Pletong Jatiwangi bh
1117 Bubungan SL Utama bh
1118 Bubungan SL Ngalayur bh
1119 Bubungan Segi Tiga Karang Pilang bh
1120 Bubungan Utama isi 3,5/m bh
1121 Genteng Bambe bh
1122 Genteng Bambe Karang Pilang bh
1123 Genteng Bambe Kecil bh
1124 Genteng Beton Cisangkan bh
1125 Genteng Gemini bh
1126 Genteng Gerard Polos m2
1127 Genteng Good Year m2
1128 Genteng Kanmuri (glazur) isi 14/m2 bh
1129 Genteng Kodok Lokal bh
1130 Genteng Kodok Kamulan bh
1131 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bh
1132 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bh
1133 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bh
1134 Genteng Kodok Karang Pilang (Surabaya) bh
1135 Genteng Kodok Soka bh
1136 Genteng Lestari bh
1137 Genteng Metal
1138 Genteng Metal 80 x 77,6 (Polos) lbr
1139 Genteng Metal 80 x 77,6 (Pasir) lbr
1140 Genteng Morando Abadi isi 18/m2 bh
1141 Genteng Morando Jatiwangi isi 18/m2 bh
1142 Genteng Morando Ngalayur isi 20/m2 bh
1143 Genteng Morando Metal bh
1144 Genteng Pejaten Mini bh
1145 Genteng Plentong bh
1146 Genteng plentong dicat bh
1147 Genteng Plentong Mantili bh
1148 Genteng Plentong Pejaten / Darmasaba bh
1149 Genteng Plentong Jatiwangi / Surabaya bh
1150 Genteng Portugis bh
1151 Genteng Pres Besar bh
1152 Genteng Pres Besar Cat bh
1153 Genteng Pres Mini bh
1154 Genteng Pres Mini Cat bh
1155 Genteng Terreal bh
1156 Genteng T. Romana bh
1157 Genteng Besar polos Lubang 35 cm bh
1158 Genteng Besar Warna Lubang 35 cm bh
1159 Fiberglas (1.80 x 0.80) M2 lbr
1160 Ijuk kg
1161 Ijuk Bersih bh
1162 Ijuk Lampung bh
1163 Ikut Celedu bh
1164 Ikut Celedu Besar Polos bh
1165 Ikut Celedu Besar Warna bh
1166 Ikut Celedu Kecil Polos bh
1167 Ikut Celedu Kecil Warna bh
1168 Kawat las kg
1169 Kawat Diameter 4 mm kg
1170 Murda / Puntal Paras bh
1171 Murda tanah liat Ex Pejaten bh
1172 Murda Kecil Polos Lubang 25 cm bh
1173 Murda Kecil Warna Lubang 25 cm bh
1174 Profil Aluminium "T" m3
1175 Seng BJLS 0,18 gelombang lbr
1176 Seng BJLS 0,22 gelombang lbr
1177 Seng BJLS 0,30 gelombang lbr
1178 Seng Zincalume Panjang 6m Tebal 0,5 mm lbr
1179 Seng Plat Lebar 0,90 M lbr
1180 Seng Plat 3" x 6" BJLS 28 lbr
1181 Seng Plat Aluminium lbr
1182 Sirap lbr
1183 Subeng Besar Polos lbr
1184 Subeng Besar Warna lbr
1185 Subeng Kecil Polos lbr
1186 Subeng Kecil Warna bh

TALI
1187 Tali Ijuk kg
1188 Tali pengikat ikat
1189 Tali pengikat alang-alang ikat
1190 Tali Rafia Gulung

SANITAIR
1191 Bak mandi fibre glass 70x70x66 cm bh
1192 Bak mandi porselin/ keramik bh
1193 Bak mandi keramik 50x50 bh
1194 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh
1195 Floor Drain Plastic bh
1196 Floor Drain Stainless bh
1197 Floor drain plastik Setara Alianco bh
1198 Floor drain stainless Setara Wasser bh
1199 Dudukan Kloset dan Perlengkapannya bh
1200 Kloset duduk INA Komplit bh
1201 closet duduk INA (putih) STD bh
1202 closet duduk INA (warna) bh
1203 Kloset duduk Amerika Standar Winplus bh
1204 closet duduk TOTO (putih) STD bh
1205 closet duduk TOTO (warna) bh
1206 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh
1207 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh
1208 Kloset duduk " TOTO Type AVANTE CW 823 J bh
1209 Kloset duduk " TOTO Type CW 660J bh
1210 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh
1211 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh
1212Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh
1213 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh
1214 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh
1215 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh
1216 Kloset jongkok " TOTO Type CE 6 COMPLIT bh
1217 Kloset jongkok " TOTO Type CE 7 COMPLIT bh
1218 closet jongkok porselin/ keramik bh
1219 Kloset porselin jongkok TOTO (standar) bh
1220 Kloset porselin jongkok Ina (standar) bh
1221 Kran biasa Setara Onda bh
1222 Kran SunEi PI/3 JHR bh
1223 Kran TOTO T 205 LCSC bh
1224 Kran TOTO T 205 MC bh
1225 Kran TOTO T 23 B13 bh
1226 Kran TOTO T 23 B13V7NB bh
1227 Kran TOTO T 26 - 13 bh
1228 Kran TOTO TX 109 LH bh
1229 Penyekat Urinoir " TOTO " Type A 100 " bh
1230 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh
1231 Soap holder " TOTO " Type S 6 N " bh
1232 Seal tape bh
1233 Urinoir TOTO (STD) bh
1234 Urinoir " TOTO U 57 M bh
1235 Urinoir " TOTO U 57 M BODI bh
1236 Urinoir INA (STD) bh
1237 Wastagel KIA Standard bh
1238 Wastagel KIA Warna bh
1239 Wastafel TOTO (putih) bh
1240 Wastafel TOTO (warna) bh
1241 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh
1242 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh
1243 Wastafel INA (putih) bh
1244 Wastafel INA (warna) bh

KUNCI DAN PENGGANTUNG


1245 Engsel H ( 80 x 50) Ps
1246 Engsel kupu-kupu Rafes 4' 304 ps
1247 Engsel pintu Setara ECOLING Ps
1248 Engsel jendela Setara ECOLING Ps
1249 Engsel jendela Setara CAMEL Ps
1250 Espagnoleth Setara Rafes 60 cm Ps
1251 Grendel Setara ESBELA Bh
1252 Grendel tanam Setara CAMEL Bh
1253 Kait angin biasa Setara CAMEL Bh
1254 Kait angin diameter 10 mm Bh
1255 Kait angin lipat Setara ESBELA Bh
1256 Kait angin tarik Setara ESBELA Bh
1257 Kunci kuda 2 x putar Bh
1258 Kunci lif 1 x putar Setara BELLEZA Bh
1259 Kunci lif 2 x putar Bh
1260 Kunci pintu TOP Setara ESBELA bh
1261 Kunci pintu Vanesa Setara CAMEL bh
1262 Kunci pintu Setara ESBELLA bh
1263 Kunci Pintu 2 x putar Setara SES Bh
1264 Kunci pintu Setara DELWIN) bh
1265 Kunci shang hae 2 x putar Bh
1266 Kunci slot / Grendel Pintu Setara DELLWYN bh
1267 Kunci tanam 2 slag Setara Dexon bh
1268 Kunci silinder bh
1269 Door holder bh
1270 Rel pintu sorong m'
1271 Rolling door plaat M2
1272 Rolling Door Aluminium M2
1273 Besi Tangga D 19, Enamel Cat bh
1274 Handle Besi Ø 12, Enamel Cat bh

PAKU
1273 Paku Beton Kg
1274 Paku Usuk Kg
1275 Paku Reng Kg
1276 Paku List Kg
1277 Paku Seng Ulir bh
1278 Paku 2-4 cm kg
1279 Paku Pancing 60 x 230 Kg
1280 Paku 5-12 cm kg
1281 Paku 2 cm (30 kg) 3/4 inch SQ dus
1282 Paku 2,5 cm (30 kg) 1 inch SQ dus
1283 Paku 3 cm (30 kg) 1 1/4 inch SQ dus
1284 Paku 4 cm (30 kg) 1 1/2 inch SQ dus
1285 Paku 5 cm (30 kg) 2 inch SQ dus
1286 Paku 7,10,12 cm (3,4,5) inch SQ dus
1287 Paku 5 -12 cm (27kg) 2,3,4,5 inch dus
1288 Paku skrup 1/2" Kg
1289 Paku skrup 2" Kg
1290 Paku skrup 3.5" Kg
1291 Bendrat 20 kg rol
1292 Sekrup Kalisiboard buah

BETON CETAK
1293 Paving Arahan 30 x 30 tebal 6 cm (K225) m2
1294 Paving Arahan 20 x 20 tebal 6 cm (K225) m2
1295 Paving 10 x 20 cm tebal 6 cm K225 (Polos) m2
1296 Paving 10 x 20 cm tebal 6 cm K225 (Warna) m2
1297 Paving 20 x 20 cm tebal 6 cm K225 (Polos) m2
1298 Paving 20 x 20 cm tebal 6 cm K225 (Warna) m2
1299 Paving 10 x 20 cm tebal 6 cm K350 (Polos) m2
1300 Paving 10 x 20 cm tebal 6 cm K350 (Warna) m2
1301 Paving 20 x 20 cm tebal 6 cm K350 (Polos) m2
1302 Paving 20 x 20 cm tebal 6 cm K350 (Warna) m2
1303 Paving 10 x 20 cm tebal 8 cm K225 (Polos) m2
1304 Paving 10 x 20 cm tebal 8 cm K225 (Warna) m2
1305 Paving 20 x 20 cm tebal 8 cm K225 (Polos) m2
1306 Paving 20 x 20 cm tebal 8 cm K225 (Warna) m2
1307 Paving 10 x 20 cm tebal 8 cm K350 (Polos) m2
1308 Paving 10 x 20 cm tebal 8 cm K350 (Warna) m2
1309 Paving 20 x 20 cm tebal 8 cm K350 (Polos) m2
1310 Paving 20 x 20 cm tebal 8 cm K350 (Warna) m2
1311 Paving 20 x 20 cm tebal 8 cm K400 (Polos) m2
1312 Paving 20 x 20 cm tebal 8 cm K400 (Warna) m2
1313 Paving Tiga Berlian tebal 6 Cm K225 (Polos) m2
1314 Paving Tiga Berlian tebal 6 cm K225 (Warna) m2
1315 Paving segi enam xexagon 6 cm K225 pc m2
1316 Paving segi enam xexagon 6 cm K225 merah m2
1317 Paving segi enam xexagon 6 cm K225 hitam m2
1318 Paving segi enam xexagon 6 cm K300 pc m2
1319 Paving segi enam xexagon 6 cm K300 merah m2
1320 Paving segi enam xexagon 6 cm K300 hitam m2
1321 Paving segi enam xexagon 6 cm K350 pc m2
1322 Paving segi enam xexagon 6 cm K350 merah m2
1323 Paving segi enam xexagon 6 cm K350 hitam m2
1324 Paving segi enam xexagon 6 cm K400 pc m2
1325 Paving segi enam xexagon 6 cm K400 merah m2
1326 Paving segi enam xexagon 6 cm K400 hitam m2
1327 Paving bujur sangkar tanpa tias 6 cm K225 pc m2
1328 Paving bujur sangkar tanpa tias 6 cm K225 merah m2
1329 Paving bujur sangkar tanpa tias 6 cm K225 hitam m2
1330 Paving bujur sangkar tanpa tias 8 cm K225 pc m2
1331 Paving bujur sangkar tanpa tias 8 cm K225 merah m2
1332 Paving bujur sangkar tanpa tias 8 cm K225 hitam m2
1333 Box Culvert Type 600x600x1200 K 350 Bh
1334 Box Culvert Type 800x800x1200 K 350 Bh
1335 Box Culvert Type 1000x1000X1200 K 350 Bh
1336 Box Culvert Type 1200x1200X1200 K 350 Bh
1337 Box Culvert Type 1500x1500x1200 K 350 Bh
1338 Box Culvert Type 2000x2000x1200 K 350 Bh
1339 Box Culvert Type 3000x2000x1200 K 350 Bh
1340 Box Culvert Type 3000x2500x1200 K 350 Bh
1341 Box Culvert Type 3000x3000x1200 K 350 Bh
1342 Saluran Berbentuk U Type 300x300x1200 K350 Bh
1343 Saluran Berbentuk U Type 300x400x1200 K350 Bh
1344 Saluran Berbentuk U Type 300x500x1200 K350 Bh
1345 Saluran Berbentuk U Type 400x400x1200 K350 Bh
1346 Saluran Berbentuk U Type 400x600x1200 K350 Bh
1347 Saluran Berbentuk U Type 400x700x1200 K350 Bh
1348 Saluran Berbentuk U Type 500x500x1200 K350 Bh
1349 Saluran Berbentuk U Type 500x600x1200 K350 Bh
1350 Saluran Berbentuk U Type 500x700x1200 K350 Bh
1351 Saluran Berbentuk U Type 600x600x1200 K350 Bh
1352 Saluran Berbentuk U Type 600x700x1200 K350 Bh
1353 Saluran Berbentuk U Type 700x700x1200 K350 Bh
1354 Saluran Berbentuk U Type 600x800x1200 K350 Bh
1355 Saluran Berbentuk U Type 800x800x1200 K350 Bh
1356 Saluran Berbentuk U Type 800x1000x1200 K350 Bh
1357 Saluran Berbentuk U Type 1000x1000x1200 K350 Bh
1358 Bentala Exs Kapal (Paras) bh
1359 Bentala Exs Kapal (Terakota) bh
1360 Kanstein Segi Lima P40 bh
1361 Kanstein Segi Lima P50 bh
1362 Kanstein 40x28x15/12 cm bh
1363 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) m'
1364 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) bh
1365 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) m'
1366 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) bh
1367 Kansteen K.250 Bh
1368 Kansteen Pendek K.250 Bh
1369 Kansteen Jalan Masuk K.250 Bh
1370 Kansteen Jalan Masuk 15x40x50 K.300 Bh
1371 Kansteen Segilima P.50, T.20, L.15 K.250 Bh
1372 Kansteen Bulat P.50, T.30, LA.10 LB.15 K.250 Bh
1373 Kanstein Jumbo (P:50,L:15,T:30 cm K225) m'
1374 Kansteen Jumbo P.50, T.30, L.15 K.250 Bh
1375 Kansteen Jumbo 15x30x50 K.300 Bh
1376 Kansteen Jumbo Mini 15x20x50 K.300 Bh
1377 Kansteen Persegi T 15, P50, L 20 K 225 Bh
1378 Kasnteen Kursi K225
1379 Kansteen Kursi T 15, L 40, P 50 K 225
1380 Kansteen Kursi T 10, L 40, P 50 K 225
1381 Kansteen Jumbo 15 x 30 x 50 K.300
1382 Kansteen Jumbo Mini 15 x 20 x 50 K.300
1383 Kansteen Kursi (Jalan Masuk) 15 x 40 x 60 K.300
1384 Kansteen kotak (P:50,t.20,La.10,Lb.16cm) K225 m'
1385 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) m'
1386 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) m'
1387 Tutup Got (Grill) (P:45, L:24, T:9 cm) Bh
1388 Tutup Got (Grill) (P:30, L:24, T:9 cm) Bh
1389 Plat Penutup 600 x 1200 Bh
1390 Plat Penutup 800 x 1200 Bh
1391 Plat Penutup 1000 x 1200 Bh
1392 Frame Manhole 600x600 Bh
1393 Frame Manhole 800x800 Bh
1394 Frame Manhole 1000x1000 Bh
1395 Cover manhole 600x600 Bh
1396 Cover manhole 800x800 Bh
1397 Cover manhole 1000x1000 Bh
1398 Grass Block 36 X 54 cm tebal 9 cm K 225 m2
1399 Grass Block lobang 5, 30 X 30 cm tebal 7 cm K 225 m2
1400 Beton Cetak Greas Blok K.250 bh
1401 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) bh
1402 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) bh

PLAFOND & TIRPLEK


1401 Acustik 30/30 lbr
1402 Celling teak (0,62 x 2,40) m2 lbr
1403 Eternit lbr
1404 Playwood 3 mm Lbr
1405 Playwood 4 mm Setara Meranti Lbr
1406 Plywood 5 mm lbr
1407 Playwood 9 mm Setara Meranti lbr
1408 Playwood aluminium lbr
1409 Gypsum Board (120x240x9) lbr
1410 Kalsiboard (4,5 x 1220 x 2420) mm lbr
1411 Tea Block 18 mm
1412 Hard board MDF lbr
1413 Multiplek 6 mm lbr
1414 Multiplek 9mm lbr
1415 Multiplek 12 mm lbr
1416 Triplek tebal 3mm (2,7mm) kayu sengon lbr
1417 Triplek tebal 3mm (2,7mm) kayu semi meranti lbr
1418 Triplek tebal 4mm (3,6mm) kayu sengon lbr
1419 Triplek tebal 4mm (3,6mm) kayu semi meranti lbr
1420 Triplek tebal 6mm (5,2mm) kayu sengon I lbr
1421 Triplek tebal 6mm (5,2mm) kayu sengon II lbr
1422 Triplek tebal 6mm (5,2mm) kayu semi meranti lbr
1423 Triplek tebal 6mm (5,2mm) kayu semi meranti II lbr
1424 Triplek tebal 8,0mm kayu sengon I lbr
1425 Triplek tebal 8,0mm kayu sengon II lbr
1426 Triplek tebal 8,0mm kayu semi meranti lbr
1427 Triplek tebal 9,0mm kayu semi meranti II lbr
1428 Triplek tebal 12 mm kayu sengon I lbr
1429 Triplek tebal 12 mm kayu semi meranti lbr
1430 Triplek tebal 15 mm kayu semi meranti lbr
1431 Triplek tebal 18 mm kayu semi meranti lbr
1432 Teakwood 122 x 244 x 2,7 mm lbr
1433 Melamine Putih/Biru 2,7 lbr
1434 Triplek aluminium jruk asli lbr
1435 Triplek aluminium jruk standar lbr
1436 Block board 18 mm sengon lbr
1437 Block board 18 mm meranti super lbr
1438 Teak block 18mm lbr
1439 Rangka Aluminium m1
1440 Rangka Metal Furing (2 x 4 cm) panjang 4 m btg
1441 Rangka Metal Furing (4 x 4 cm) panjang 4 m btg
1442 Teak wood (1,20x2,40x 0,4) lbr
1443 Teak wood (0,90x2,00 x 0,4) lbr
1444 Jabar Wood 4 mm lbr

BUIS BETON
1445 Buis beton Diameter 25 x 75 bh
1446 Buis beton Diameter 30 x 75 bh
1447 Buis beton Diameter 50 x 75 bh
1448 Buis Beton diameter 80 cm bh
1449 Buis Beton diameter 25 cm bh
1450 Buis Beton diameter 50 cm bh
1451 Buis Beton diameter 100 cm bh

BETON READY MIX


1452 Beton Ready Mix K-175 TM Kap 7 m3 m3
1453 Beton Ready Mix K-225 TM Kap 7 m3 m3
1454 Beton Ready Mix K-250 TM Kap 7 m3 m3
1455 Beton Ready Mix K-275 TM Kap 7 m3 m3
1456 Beton Ready Mix K-300 TM Kap 7 m3 m3
1457 Beton Ready Mix K-350 TM Kap 7 m3 m3
1458 Sewa Concrete pump/M3 ls
1459 Formite/penjaga jarak bekisting/spacer bh

TALANG
1460 Talang Karet L = 0.50 m'
1461 Talang Karet L = 0.90 m'
1462 Pipa Talang PVC Setara Maspion 6" Setengah Lingkaran m'
1463 Pipa Talang PVC Setara Maspion 6" Kotak m'

ASPAL, BBM DAN PELUMAS


1464 Aspal Penetrasi 60/70 Kg (Mengacu ke ASHP Bina Marga )
1465 Aspal Curah Kg (Mengacu ke ASHP Bina Marga )
1466 Aspal RC Kg (Mengacu ke ASHP Bina Marga )
1467 Aspal Emulsi ltr (Mengacu ke ASHP Bina Marga )
1468 Aspal Emulsi CRS 1 ltr (Mengacu ke ASHP Bina Marga )
1469 Aspal Emulsi CRS 1 Modif (Mengacu ke ASHP Bina Marga )
1470 Aspal Emulsi CRS 2 ltr (Mengacu ke ASHP Bina Marga )
1471 Aspal Emulsi CSS 1 h Modif ltr (Mengacu ke ASHP Bina Marga )
1472 Aspal Emulsi CSS 1 h ltr (Mengacu ke ASHP Bina Marga )
1473 Aspal Emulsi CSS 1 / PCE ltr (Mengacu ke ASHP Bina Marga )
1474 Minyak Aspal ( fluck oil ) Ltr (Mengacu ke ASHP Bina Marga )
1475 Minyak Tanah Ltr (Mengacu ke ASHP Bina Marga )
1476 Minyak Tanah Industri Ltr (Mengacu ke ASHP Bina Marga )
1477 Solar Ltr
1478 Solar Industri Ltr
1479 Premium Ltr
1480 Premium (industri) Ltr
1481 Pelumas ( olie ) Ltr (Mengacu ke ASHP Bina Marga )
1482 Kayu Api M3 (Mengacu ke ASHP Bina Marga )
1483 Gas elpiji Kg (Mengacu ke ASHP Bina Marga )
1484 Minyak Begesting ( B 115 ) Ltr (Mengacu ke ASHP Bina Marga )
1485 Aspal Cold Mix (Readymix) Kg (Mengacu ke ASHP Bina Marga )

ALAT PEMADAM KEBAKARAN


1486 Instalasi pipa induk BS 3" Sch M'
1487 Intalasi pipa distribusi BS 2" Sch M'
1488 Seamesi conection Bh
1489 Box hidran dengan kelengkapannya Bh
1490 Selang pemadam 30 m Bh
1491 Pemadam api ringan 6 kg Bh

TANAMAN
1492 Pohon Lianglio / Salix Babylonica pohon
1493 Palem Ekor Tupai / Wodyetia Bifurcata pohon
1494 Pohon Hias pohon
1495 Pohon Jepun / Plumeria Rubra pohon
1496 Pohon Pudak / Pandanus Tectorius pohon
1497 Pohon Ketapag Kencana / Terminalia Molineti pohon
1498 Pohon Sente Batang Hitam / Alokasia 'black' pohon
1499 Pohon Dadap Merah / Erythrina Crista Galli pohon
1500 Pohon Jepun Pagoda / Plumeria 'pagoda' pohon
1501 Pohon Tabebuya / Chrysotricha sp pohon
1502 Rumput (Sekelas rumput mutiara) m2
1503 Semak Jempiring / Gardenia Jasminioides polybag
1504 Semak Spathyphilum / Spathyphylum sp polybag
1505 Semak Reulia Besar / Reulia Malacosperma Giant polybag
1506 Semak Anturium Bunga / Anthurium Andreanum polybag
1507 Semak Hemigrapis / Hemigrapis sp polybag
1508 Semak Puring / Codeaium variegatum polybag
1509 Semak Pakis Bulu / Nephrolepis biserrata polybag
1510 Tanaman rumput mutiara/jepang m2
1511 Tanaman perdu m2
1512 Lili Bangkok / Hymenocalis litoralis polybag
1513 Jempiring / Gardenia jasminioides polybag
1514 Kaki Laba-laba / Oxmosilum Liniare Yellow polybag
1515 Semak Bawang-bawangan / Ornithogalum umbrellatum polybag
1516 Semak Kebang Kertas Daun Kecil / Bogenvile small leave polybag
1517 Semak Lily Paris / Hymenocallis Speciosa polybag
1518 Semak Daun Philodendron / Philodendron sp polybag
1519 Semak Bunga Yolanda / Yolanda white flower polybag
1520 Semak Karembusa Putih / Tebermontana carembusa 'white' polybag
1521 Semak Simbang Darah / Excoecaria Cochinechinensis polybag
1522 Semak Bromelia / Bromelia sp polybag
1523 Pupuk Kandang m3

LAIN - LAIN
1524 Air Bersih Ltr
1525 Bak Cuci Aluminium 2 Lubang Bh
1526 Belanja Foto Copy Lembar
1527 Cangkul Bh
1528 Cangkul Gigi Bh
1529 Ember Bh
1530 Ember Hitam Bh
1531 Gerinding bh
1532 Helm Proyek Bh
1533 Hammer 3 kg Bh
1534 Instalasi Tata Suara Titik
1535 Isi Bay Fresh Ruangan Buah
1536 Isi Staples No 30. Pack
1537 Isi Sabun Hand Soap Buah
1538 Isi Kapur Barus Kg
1539 Kapi Bh
1540 Keni 2" Bh
1541 Keranjang Sampah Bh
1542 Keset Bh
1543 Lap Kanebo Bh
1544 Lap Pel / Alat Pengepelan Buah
1545 Linggis bh
1546 Masker Bh
1547 Ompreng Besar (bak Adonan) Bh
1548 Panyong Bh
1549 Pembersih Ban Ltr
1550 Pembersih Lantai Galon
1551 Pembersih Lantai Toilet Buah
1552 Pembersih Kaca Galon
1553 Pembersih Toilet Galon
1554 Pengelasan cm
1555 Pengharum Mobil Cair Ltr
1556 Pengharum Ruangan Buah
1557 Sabun Buah
1558 Sabit Bh
1559 Sapu lidi Ikat
1560 Sapu Ijuk Bh
1561 Sapu Bulu Ayam Super Bh
1562 Shampo Mobil Bh
1563 Sepatu Karet Ltr
1564 Sikat baja Bh
1565 Sikat Ban
1566 Skop Bh
1567 Tempat Sampah Tutup Buah
1568 Tissue Gulung Buah
1569 Tissue Kotak Pack
1570 Water mur Bh
1571 Pipa Tremi dan Casing pelindung Ls
1572 Pelumas (Oli) Ltr
1573 Ramset m'
1574 Pembuangan lumpur eks. Bor m3
1575 Mobilisasi dan demobilisasi alat bor auger ZKL28 unit
1576 Mobilisasi dan demobilisasi alat bor auger ZKL28 Unit
1577 Service Crane kapasitas 50 ton bln
1578 Excavator PC200 bln
1579 Pengadaan rail beam untuk pemancangan ls
1580 Pemotongan kepala tiang pancang turap m'
1581 Galian tanah untuk capping beam m3
1582 Pembuangan tanah galian m3
1583 Pekerjaan Cetakan/Tutup Kepala Kolom bh
1584 Pek. Pembuatan papan nama proyek ls
DAFTAR HARGA BAHAN TAMBAHAN
PADA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KOTA DENPASAR TAHUN 2020

HARGA SATUAN 2019


NO NAMA BARANG SAT.
(Rp)

1 2 3 4

BIDANG UMUM
1 Jaring Sungar m2 ###
2 Tali Seling m' ###
3 Tali m' ###
4 Sekop Datar bh ###
5 Selang Air m' ###
6 Terpal m2 ###

BIDANG BINA MARGA


1 Uditch 1000 x 1000 x 1200 K 350 unit ###
2 Uditch 1200 x 1200 x 1200 K 350 unit ###
3 Plat Penutup 400 x 1200 K 350 unit ###
4 Plat Penutup 1200 x 1200 x 1200 K 350 unit ###
5 Frame Manhole 1200 x 1200 unit ###
6 Cover Manhole 1200 x 1200 unit ###
7 Abu Batu m3 ###

BAHAN K3
A Alat Pelindung Diri
1 Topi Pelindung (safety Helmet) bh ###
2 Pelindung Mata (Goggles, Spectacles) bh ###
3 Tameng Mata (face Shield) bh ###
4 Masker Selam (Breathing Apparatus) bh ###
5 Pelindung Telinga (Ear Plug, Ear Muff) bh ###
6 Pelindung Pernafasan dan Mulut (Masker) bh ###
7 Sarung Tangan (Safety Gloves) bh ###
8 Penunjang Seluruh Tubuh (Full Body Harness) bh ###
9 Jaket Pelampung (Life Vest) bh ###
10 Celemek (Apron/Coverralls) bh ###
11 Pelindung Jatuh (Fall Arrester) bh ###

B Rambu-Rambu K3 bh ###
1 Rambu Petunjuk bh ###
2 Rambu Larangan bh ###
3 Rambu Peringatan bh ###
4 Rambu Kewajiban bh ###
5 Rambu Informasi bh ###
6 Rambu Pekerjaan Sementara bh ###
7 Tongkat Pengatur Lalu Lintas (Warning Light Stck) bh ###
8 Kerucut Lalu Lintas (Traffic Cone) bh ###
9 Lampu Putar (Rotary Lamp) bh ###
10 Lampu Selang Lalu Lintas bh
C Pengendaliang Resiko K3
1 Alat Pemadam Api Ringan (APAR) bh ###
2 Sirine bh ###
3 Bendera K3 bh
4 Lampu Darurat (Emergency Lamp) bh ###

BAHAN TAMBAHAN
1 List Gypsum Profil 5 cm m'
2 Bubungan Genteng glazur bh
3 Tempat Sabun bh
4 Kusen Aluminum m'
5 Rangka Jendela Aluminium m'
6 Rangka Pintu Aliminium m'
7 Door Stoper bh
8 Door Closer bh
9 Kusen dan Pintu PVC Toilet unit
10 Genteng Keramik ex Jatiwangi bh
11 Genteng Keramik Glazur ex KANMURI bh
12 Nok Genteng Keramik EX Jatiwangi bh
13 Nok Genteng Keramik Ex Kanmuri bh
14 Kran Zink bh
15 Kran Dinding bh
16 Kitchen Zink bh
17 Floor Drain bh
18 Bak Air Fibergles bh
19 Klep Diameter 3/4" bh
20 Tangkin Air 1000 Liter bh
21 Tangki Air 500 Liter bh
22 Pelampung Otomatis bh
23 Roof Drain Metal bh
24 Mesin Jet Pump kap 250 watt ex Grounfos bh
25 Mesin Pompa Tekan kap. 150 watt ex Grounfos bh
26 Box Panel PVC isi 4 MCB ex Legran bh
27 MCB 6 A ex Legran bh
28 MCB 4 A ex Legran bh
29 Kabel telephone 4 x 0.5 mm m'
30 Oulet TV Broco bh
31 Outlet Telephone bh
32 Dowlight/PLC 13 W bh
-
DAFTAR HARGA SEWA
SCAFOLDING
KOTA DENPASAR TAHUN 2020

HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
1 Main Frame m3
2 Cross brace 220 m3
3 End Frame m3
4 Join Pen m3
5 U-Head m3
6 Jack Base m3
REKAPITULASI
HARGA PERKIRAAN SENDIRI (HPS)

Kegiatan : Pengelolaan Pendidikan Sekolah Dasar


Sub Kegiatan : Rehabilitasi Sedang/Berat Bangunan Sekolah
Pekerjaan : Belanja Modal Pengadaan Bangunan Gedung Tempat Pendidikan Rehabilitasi Gedung
SDN 8 Pemecutan
Tahun Anggaran : 2021

JUMLAH HARGA
NO. URAIAN PEKERJAAN
Rp
1 2 3

I PEKERJAAN PERSIAPAN 9,389,987.47


II PEKERJAAN TANAH & PASIR 494,980.50
III PEKERJAAN PASANGAN & BETON 28,172,067.51
IV PEKERJAAN KAP & ATAP 92,328,086.30
V PEKERJAAN PLAFOND & LANTAI 27,569,457.50
VI PEKERJAAN KUSEN, PINTU, JENDELA & PENGGANTUNG 12,123,510.00
VII PEKERJAAN ELEKTRIKAL 3,235,000.00
VIII PEKERJAAN FINISHING 8,296,152.40

Jumlah RP = 181,609,241.68
PPN. 10% = 18,160,924.17
Jumlah total RP = 199,770,165.85
Dibulatkan RP = 199,770,000.00

Terbilang : #Seratus sembilan puluh sembilan juta tujuh ratus tujuh puluh ribu rupiah#

KPA / Pejabat Pembuat Komitmen ( PPK )


Dinas Pendidikan Kepemudaan
dan Olahraga Kota Denpasar

Drs. I MADE SUENA, M.Pd


NIP. 19631231 198411 1 219
HARGA PERKIRAAN SENDIRI (HPS)

Kegiatan : Pengelolaan Pendidikan Sekolah Dasar


Sub Kegiatan : Rehabilitasi Sedang/Berat Bangunan Sekolah
Pekerjaan : Belanja Modal Pengadaan Bangunan Gedung Tempat Pendidikan Rehabilitasi Gedung
SDN 8 Pemecutan
Tahun Anggaran : 2021
Harga Jumlah
No. Uraian Pekerjaan Volume Sat Satuan Harga
( Rp. ) ( Rp. )
1 2 3 4 5 6 = (3x5 )

I PEKERJAAN PERSIAPAN
1 Pek. Pembuatan papan nama kegiatan 1.00 Bh 300,000.00 300,000.00
2 Pek. Pembersihan Lokasi 1.00 Ls 500,000.00 500,000.00
3 Pek. Biaya K3 1.00 Ls 500,000.00 500,000.00
4 Pek. Pembongkaran Atap 235.51 m2 9,700.00 2,284,447.00
5 Pek. Pembongkaran Kap 188.66 m2 27,600.00 5,207,016.00
6 Pek. Pembongkaran penutup Palfond 109.90 m2 3,750.00 412,125.00
7 Pek. Pembongkaran Kusen Pintu & Jendela 2.00 bh 93,199.74 186,399.47

SUB TOTAL…………………...I 9,389,987.47

II PEKERJAAN TANAH & PASIR


1 Pek. Galian Tanah Pondasi Menerus & Foot Plat 3.43 m3 87,250.00 299,267.50
2 Pek. Urugan Tanah Kembali 2.40 m3 62,500.00 150,000.00
3 Pek. Urugan Pasir 0.17 m3 268,900.00 45,713.00

SUB TOTAL………………….II 494,980.50

III PEKERJAAN PASANGAN & BETON


1 Pek. Pasangan tembok bataco 1pc : 4 ps 10.69 m2 183,154.00 1,957,916.26
2 Pek. Beton Pondasi Foot Plat
a. Beton mutu f'c 14,5 Mpa 0.68 m3 1,079,327.70 733,942.83
b. Pembesian 123.76 kg 12,491.50 1,545,948.04
3 Pek. Beton Sloof Praktis 10x15 cm 16.00 m' 115,569.00 1,849,104.00
4 Pek. Beton Kolom 15x15 cm
a. Beton mutu f'c 14,5 Mpa 0.69 m3 1,079,327.70 744,736.11
b. Pembesian 146.72 kg 12,491.50 1,832,752.88
c. Begesting 2x pakai 18.48 kg 166,890.00 3,084,127.20
5 Pek. Beton Balok 15x20 cm
a. Beton mutu f'c 14,5 Mpa 0.64 m3 1,079,327.70 690,769.73
b. Pembesian 108.07 kg 12,491.50 1,349,956.41
c. Begesting 2x pakai 23.70 kg 346,230.00 8,205,651.00
6 Pek. Beton Balok Ring Praktis 10x15 cm 53.45 m' 115,569.00 6,177,163.05

SUB TOTAL………………….III 28,172,067.51

IV PEKERJAAN KAP & ATAP


1 Pek. Pemasangan Kap Kuda-kuda Baja Ringan Frofil UK.75 ex. axis 197.10 m2 289,968.00 57,152,692.80
2 Pek. Listplank Condwood 20 cm 57.90 m' 57,310.00 3,318,249.00
3 Pek. Pemasangan atap genteng 243.00 m2 104,885.00 25,487,055.00
4 Pek. Pemasangan bubungan genteng 45.80 m' 125,740.00 5,758,892.00
5 Pek. Pemasangan Murda Paras 2.00 bh 101,866.25 203,732.50
6 Pek. Pemasangan Ikut Celedu Paras 4.00 bh 101,866.25 407,465.00

SUB TOTAL…………………. IV 92,328,086.30

V PEKERJAAN PLAFOND & LANTAI


1 Pas. Penutup Plafond Gypsum 9 mm jayaboard + rangka Holllow 3,5x3,5 169.50 m2 136,593.80 23,152,649.10
2 Pas. List Plafond Gypsum 7/7 105.70 m' 28,940.00 3,058,958.00
3 Pas. List Plafond Gypsum 1/5 37.90 m' 19,840.00 751,936.00
4 Pas. Penutup lantai keramik 30x30 ex. Asia tile 6.56 m2 92,365.00 605,914.40

SUB TOTAL………………….V 27,569,457.50

VI PEKERJAAN KUSEN, PINTU, JENDELA & PENGGANTUNG


1 Pek. Kusen Pintu & Jendela Kayu Kamfer 0.06 m3 13,974,500.00 838,470.00
2 Pek. Daun Pintu Panel Kayu Kamfer 5.12 m2 886,000.00 4,536,320.00
3 Pek. Papan Ram Ventilasi 1,5/5 kayu Kruing 91.50 m' 41,500.00 3,797,250.00
4 Pek. Pemasangan kunci Pintu ex. Solid 2.00 bh 310,000.00 620,000.00
5 Pek. Pemasangan Engsel Pintu ex. Solid 12.00 bh 68,065.00 816,780.00
6 Pek. Pemasangan Engsel Jendela Ex. Solid 8.00 bh 57,800.00 462,400.00
7 Pek. Pemasangan Grendel Exspanoyet ex. Solid 2.00 ps 200,465.00 400,930.00
8 Pek. Pemasangan Grendel Jendela ex. Solid 4.00 bh 69,580.00 278,320.00
9 Pek. Pemasangan Kait Angin Ex. Solid 8.00 bh 46,630.00 373,040.00

SUB TOTAL………………..…VI 12,123,510.00


VII PEKERJAAN ELEKTRIKAL
1 Instalasi titik lampu NYM 3x2,5 mm2 dalam pipa conduit 10.00 ttk 293,000.00 2,930,000.00
2 Pemasangan Stop Kontak 2.00 Bh 55,000.00 110,000.00
3 Pemasangan saklar double 3.00 Bh 65,000.00 195,000.00

SUB TOTAL………………….VII 3,235,000.00

VIII PEKERJAAN FINISHING


1 Pek. Cat Dasar permukaan kayu baru 30.00 m2 28,895.00 866,850.00
2 Pek. Cat Permukaan Kayu 2x lapis ex. Emco 30.00 m2 63,015.00 1,890,450.00
3 Pek. Polituran Daun Pintu Panel 16.16 m2 84,515.00 1,365,762.40
4 Pek. Pengecatan Penutup Plafond ex. Vinilex 169.50 m2 24,620.00 4,173,090.00

SUB TOTAL…………………. VIII 8,296,152.40

Jumlah Total Rp. = 181,609,241.68


BERITA ACARA PENYUSUNAN HPS

Kegiatan : Pengelolaan Pendidikan Sekolah Dasar


Sub Kegiatan : Rehabilitasi Sedang/Berat Bangunan Sekolah
Pekerjaan : Belanja Modal Pengadaan Bangunan Gedung Tempat Pendidikan Rehabilitasi Gedung SDN 8 Pemecutan
Tahun Anggaran : 2021

CV. MADYA UTAMA CV. KURNIA JAYA UTAMA CV. KABI KARYA PERMAI HARGA SATUAN HPS
NO. URAIAN PEKERJAAN DAN SPESIFIKASI TEKNIS VOLUME Harga Satuan Jumlah Harga Satuan Jumlah Harga Satuan Jumlah Harga Satuan Jumlah
Rp Rp Rp Rp Rp Rp Rp Rp

I PEKERJAAN PERSIAPAN
1 Pek. Pembuatan papan nama kegiatan 1.00 Bh 200,000.00 200,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00
2 Pek. Pembersihan Lokasi 1.00 Ls 300,000.00 300,000.00 400,000.00 400,000.00 500,000.00 500,000.00 500,000.00 500,000.00
3 Pek. Biaya K3 1.00 Ls 300,000.00 300,000.00 400,000.00 400,000.00 500,000.00 500,000.00 500,000.00 500,000.00
4 Pek. Pembongkaran Atap 235.51 m2 9,700.00 2,284,447.00 9,700.00 2,284,447.00 9,700.00 2,284,447.00 9,700.00 2,284,447.00
5 Pek. Pembongkaran Kap 188.66 m2 27,600.00 5,207,016.00 27,600.00 5,207,016.00 27,600.00 5,207,016.00 27,600.00 5,207,016.00
6 Pek. Pembongkaran penutup Palfond 109.90 m2 3,750.00 412,125.00 3,750.00 412,125.00 3,750.00 412,125.00 3,750.00 412,125.00
7 Pek. Pembongkaran Kusen Pintu & Jendela 2.00 bh 93,199.74 186,399.47 93,199.74 186,399.47 93,199.74 186,399.47 93,199.74 186,399.47

SUB TOTAL…………………...I 8,889,987.47 9,189,987.47 9,389,987.47 9,389,987.47

II PEKERJAAN TANAH & PASIR


1 Pek. Galian Tanah Pondasi Menerus & Foot Plat 3.43 m3 87,250.00 299,267.50 87,250.00 299,267.50 87,250.00 299,267.50 87,250.00 299,267.50
2 Pek. Urugan Tanah Kembali 2.40 m3 62,500.00 150,000.00 62,500.00 150,000.00 62,500.00 150,000.00 62,500.00 150,000.00
3 Pek. Urugan Pasir 0.17 m3 268,900.00 45,713.00 268,900.00 45,713.00 268,900.00 45,713.00 268,900.00 45,713.00

SUB TOTAL………………….II 494,980.50 494,980.50 494,980.50 494,980.50

III PEKERJAAN PASANGAN & BETON


1 Pek. Pasangan tembok bataco 1pc : 4 ps 10.69 m2 183,154.00 1,957,916.26 183,154.00 1,957,916.26 183,154.00 1,957,916.26 183,154.00 1,957,916.26
2 Pek. Beton Pondasi Foot Plat
a. Beton mutu f'c 14,5 Mpa 0.68 m3 1,079,327.70 733,942.83 1,079,327.70 733,942.83 1,079,327.70 733,942.83 1,079,327.70 733,942.83
b. Pembesian 123.76 kg 12,491.50 1,545,948.04 12,491.50 1,545,948.04 12,491.50 1,545,948.04 12,491.50 1,545,948.04
3 Pek. Beton Sloof Praktis 10x15 cm 16.00 m' 115,569.00 1,849,104.00 115,569.00 1,849,104.00 115,569.00 1,849,104.00 115,569.00 1,849,104.00
4 Pek. Beton Kolom 15x15 cm
a. Beton mutu f'c 14,5 Mpa 0.69 m3 1,079,327.70 744,736.11 1,079,327.70 744,736.11 1,079,327.70 744,736.11 1,079,327.70 744,736.11
b. Pembesian 146.72 kg 12,491.50 1,832,752.88 12,491.50 1,832,752.88 12,491.50 1,832,752.88 12,491.50 1,832,752.88
c. Begesting 2x pakai 18.48 kg 166,890.00 3,084,127.20 166,890.00 3,084,127.20 166,890.00 3,084,127.20 166,890.00 3,084,127.20
5 Pek. Beton Balok 15x20 cm
a. Beton mutu f'c 14,5 Mpa 0.64 m3 1,079,327.70 690,769.73 1,079,327.70 690,769.73 1,079,327.70 690,769.73 1,079,327.70 690,769.73
b. Pembesian 108.07 kg 12,491.50 1,349,956.41 12,491.50 1,349,956.41 12,491.50 1,349,956.41 12,491.50 1,349,956.41
c. Begesting 2x pakai 23.70 kg 346,230.00 8,205,651.00 346,230.00 8,205,651.00 346,230.00 8,205,651.00 346,230.00 8,205,651.00
6 Pek. Beton Balok Ring Praktis 10x15 cm 53.45 m' 115,569.00 6,177,163.05 115,569.00 6,177,163.05 115,569.00 6,177,163.05 115,569.00 6,177,163.05

SUB TOTAL………………….III 28,172,067.51 28,172,067.51 28,172,067.51 28,172,067.51

IV PEKERJAAN KAP & ATAP


CV. MADYA UTAMA CV. KURNIA JAYA UTAMA CV. KABI KARYA PERMAI HARGA SATUAN HPS
NO. URAIAN PEKERJAAN DAN SPESIFIKASI TEKNIS VOLUME Harga Satuan Jumlah Harga Satuan Jumlah Harga Satuan Jumlah Harga Satuan Jumlah
Rp Rp Rp Rp Rp Rp Rp Rp
1 Pek. Pemasangan Kap Kuda-kuda Baja Ringan Frofil UK.75 ex. axis 197.10 m2 287,768.00 56,719,072.80 289,968.00 57,152,692.80 289,968.00 57,152,692.80 289,968.00 57,152,692.80
2 Pek. Listplank Condwood 20 cm 57.90 m' 57,310.00 3,318,249.00 57,310.00 3,318,249.00 57,310.00 3,318,249.00 57,310.00 3,318,249.00
3 Pek. Pemasangan atap genteng 243.00 m2 104,885.00 25,487,055.00 104,885.00 25,487,055.00 104,885.00 25,487,055.00 104,885.00 25,487,055.00
4 Pek. Pemasangan bubungan genteng 45.80 m' 125,740.00 5,758,892.00 125,740.00 5,758,892.00 125,740.00 5,758,892.00 125,740.00 5,758,892.00
5 Pek. Pemasangan Murda Paras 2.00 bh 101,866.25 203,732.50 101,866.25 203,732.50 101,866.25 203,732.50 101,866.25 203,732.50
6 Pek. Pemasangan Ikut Celedu Paras 4.00 bh 101,866.25 407,465.00 101,866.25 407,465.00 101,866.25 407,465.00 101,866.25 407,465.00

SUB TOTAL…………………. IV 91,894,466.30 92,328,086.30 92,328,086.30 92,328,086.30

V PEKERJAAN PLAFOND & LANTAI


1 Pas. Penutup Plafond Gypsum 9 mm jayaboard + rangka Holllow 3,5x3,5 169.50 m2 136,593.80 23,152,649.10 136,593.80 23,152,649.10 136,593.80 23,152,649.10 136,593.80 23,152,649.10
2 Pas. List Plafond Gypsum 7/7 105.70 m' 28,940.00 3,058,958.00 28,940.00 3,058,958.00 28,940.00 3,058,958.00 28,940.00 3,058,958.00
3 Pas. List Plafond Gypsum 1/5 37.90 m' 19,840.00 751,936.00 19,840.00 751,936.00 19,840.00 751,936.00 19,840.00 751,936.00
4 Pas. Penutup lantai keramik 30x30 ex. Asia tile 6.56 m2 92,365.00 605,914.40 92,365.00 605,914.40 92,365.00 605,914.40 92,365.00 605,914.40

SUB TOTAL………………….V 27,569,457.50 27,569,457.50 27,569,457.50 27,569,457.50

VI PEKERJAAN KUSEN, PINTU, JENDELA & PENGGANTUNG


1 Pek. Kusen Pintu & Jendela Kayu Kamfer 0.06 m3 13,974,500.00 838,470.00 13,974,500.00 838,470.00 13,974,500.00 838,470.00 13,974,500.00 838,470.00
2 Pek. Daun Pintu Panel Kayu Kamfer 5.12 m2 886,000.00 4,536,320.00 886,000.00 4,536,320.00 886,000.00 4,536,320.00 886,000.00 4,536,320.00
3 Pek. Papan Ram Ventilasi 1,5/5 kayu Kruing 91.50 m' 41,500.00 3,797,250.00 41,500.00 3,797,250.00 41,500.00 3,797,250.00 41,500.00 3,797,250.00
4 Pek. Pemasangan kunci Pintu ex. Solid 2.00 bh 310,000.00 620,000.00 310,000.00 620,000.00 310,000.00 620,000.00 310,000.00 620,000.00
5 Pek. Pemasangan Engsel Pintu ex. Solid 12.00 bh 68,065.00 816,780.00 68,065.00 816,780.00 68,065.00 816,780.00 68,065.00 816,780.00
6 Pek. Pemasangan Engsel Jendela Ex. Solid 8.00 bh 57,800.00 462,400.00 57,800.00 462,400.00 57,800.00 462,400.00 57,800.00 462,400.00
7 Pek. Pemasangan Grendel Exspanoyet ex. Solid 2.00 ps 200,465.00 400,930.00 200,465.00 400,930.00 200,465.00 400,930.00 200,465.00 400,930.00
8 Pek. Pemasangan Grendel Jendela ex. Solid 4.00 bh 69,580.00 278,320.00 69,580.00 278,320.00 69,580.00 278,320.00 69,580.00 278,320.00
9 Pek. Pemasangan Kait Angin Ex. Solid 8.00 bh 46,630.00 373,040.00 46,630.00 373,040.00 46,630.00 373,040.00 46,630.00 373,040.00

SUB TOTAL………………..…VI 12,123,510.00 12,123,510.00 12,123,510.00 12,123,510.00

VII PEKERJAAN ELEKTRIKAL


1 Instalasi titik lampu NYM 3x2,5 mm2 dalam pipa conduit 10.00 ttk 293,000.00 2,930,000.00 293,000.00 2,930,000.00 293,000.00 2,930,000.00 293,000.00 2,930,000.00
2 Pemasangan Stop Kontak 2.00 Bh 55,000.00 110,000.00 55,000.00 110,000.00 55,000.00 110,000.00 55,000.00 110,000.00
3 Pemasangan saklar double 3.00 Bh 65,000.00 195,000.00 65,000.00 195,000.00 65,000.00 195,000.00 65,000.00 195,000.00

SUB TOTAL………………….VII 3,235,000.00 3,235,000.00 3,235,000.00 3,235,000.00

VIII PEKERJAAN FINISHING


1 Pek. Cat Dasar permukaan kayu baru 30.00 m2 28,895.00 866,850.00 28,895.00 866,850.00 28,895.00 866,850.00 28,895.00 866,850.00
2 Pek. Cat Permukaan Kayu 2x lapis ex. Emco 30.00 m2 63,015.00 1,890,450.00 63,015.00 1,890,450.00 63,015.00 1,890,450.00 63,015.00 1,890,450.00
3 Pek. Polituran Daun Pintu Panel 16.16 m2 84,515.00 1,365,762.40 84,515.00 1,365,762.40 84,515.00 1,365,762.40 84,515.00 1,365,762.40
4 Pek. Pengecatan Penutup Plafond ex. Vinilex 169.50 m2 24,620.00 4,173,090.00 24,620.00 4,173,090.00 24,620.00 4,173,090.00 24,620.00 4,173,090.00

SUB TOTAL…………………. VIII 8,296,152.40 8,296,152.40 8,296,152.40 8,296,152.40

Jumlah Total Rp. = 180,675,621.68 181,409,241.68 181,609,241.68 181,609,241.68


PPN 10% 18,067,562.17 18,140,924.17 18,160,924.17 18,160,924.17
TOTAL 198,743,183.85 199,550,165.85 199,770,165.85 199,770,165.85
Dibulatkan 198,743,000.00 199,550,000.00 199,770,000.00 199,770,000.00
CV. MADYA UTAMA CV. KURNIA JAYA UTAMA CV. KABI KARYA PERMAI HARGA SATUAN HPS
NO. URAIAN PEKERJAAN DAN SPESIFIKASI TEKNIS VOLUME Harga Satuan Jumlah Harga Satuan Jumlah Harga Satuan Jumlah Harga Satuan Jumlah
Rp Rp Rp Rp Rp Rp Rp Rp

Denpasar, 16 Februari 2021


KPA / Pejabat Pembuat Komitmen ( PPK )
Dinas Pendidikan Kepemudaan
dan Olahraga Kota Denpasar

Drs. I MADE SUENA, M.Pd


NIP. 19631231 198411 1 219
DAFTAR HARGA SATUAN UPAH
TAHUN 2020

HARGA
NO NAMA SATUAN
Rp
1 2 3 4
1 Pekerja Hari 112,000.00
2 Tukang Gali Hari 111,000.00
3 Tukang batu/tembok Hari 115,000.00
4 Tukang Kayu Hari 115,000.00
5 Tukang besi/besi beton Hari 115,000.00
6 Tukang Cat/pelitur Hari 115,000.00
7 Tukang pipa Hari 115,000.00
8 Tukang pipa/operator pompa Hari 115,000.00
9 Tukang Style Bali Hari 160,000.00
10 Tukang Listrik Hari 115,000.00
11 Tukang Las Hari 110,000.00
12 Tukang aluminium Hari 115,000.00
13 Kepala Tukang Hari 115,000.00
14 Kepala Tukang Style Bali Hari 180,000.00
15 Mandor Style Bali Hari 200,000.00
16 Mandor Hari 130,000.00
17 Juru Ukur Hari 107,000.00
18 Pembantu Juru Ukur Hari 105,000.00
19 Mekanik alat berat Hari 103,000.00
20 Operator alat berat Hari 110,000.00
21 Pembantu operator Hari 115,000.00
22 Supir truk Hari 120,000.00
23 Kernet truk Hari 110,000.00
24 Juru gambar (drafter) Hari 115,000.00
25 Operator printer/plotter Hari 110,000.00
26 Tukang Masak Aspal Hari 110,000.00
27 Tukang Cor Aspal Hari 110,000.00
28 Pekerja Pembantu Tukang Aspal Hari 103,000.00
29 Penjaga Api Hari 103,000.00
30 Sopir SIM A Hari 107,000.00
31 Sopir SIM B1 Hari 103,000.00
32 Sopir SIM B2 Hari 103,000.00
33 Operator Hari 107,000.00
34 Operator Semi Terampil Hari 105,000.00
35 Pembantu Operator Hari 103,000.00
36 Pembantu Sopir Hari 103,000.00
37 Mekanik Terampil Hari 105,000.00
38 Masinis Hari 110,000.00
39 Pembantu Masinis Hari 115,000.00
40 Ongkos Kerja Pemasangan dan Pengelasan Hari 95,000.00
42 Ongkos Pemasangan Lampu Ls 25,000.00
43 Ongkos Pemasangan Panel Ls 550,000.00
44 Pembantu Mekanik Hari 95,000.00
45 Pasang Atap Alang-Alang Hari 110,000.00
46 Pasang Bata Gosok Dua Muka m2 355,000.00
47 Pasang Bata Gosok Satu Muka m2 250,000.00
48 Pasang Batu Paras Diukir m2 350,000.00
49 Pasang Patu Paras Siap Diukir m2 350,000.00
50 Ongkos Ngebor O 30 cm m' 85,000.00
51 Ongkos Polis Kaca Tempered Tebal 5mm m' 75,000.00
52 Ongkos Polis Kaca Tempered Tebal 6mm m' 75,000.00
53 Ongkos Polis Kaca Tempered Tebal 8mm m' 75,000.00
54 Ongkos Polis Kaca Tempered Tebal 10mm m' 75,000.00
55 Ongkos Polis Kaca Tempered Tebal 12mm m' 75,000.00
56 Ongkos Polis Kaca Tempered Tebal 19mm m' 75,000.00
UPAH KERJA LAINNYA :
57 Pasangan Bata Gosok 2 Muka m2 355,000.00
58 Pasangan Paras Kerobokan 1 Muka m2 200,000.00
59 Pasangan Bata Press 1 Muka m2 200,000.00
60 Pasangan Paras 1 Muka m2 200,000.00
61 Pasangan Batu Palimanan Tebal 3 cm m2 200,000.00
62 Pasangan Paras + Bata Gosok 1 Muka m2 200,000.00
63 Pasangan Bata Gosok Diukir m2 355,000.00
64 Pasangan Batu Tabas Karangasem Diukir m2 355,000.00
65 Pasangan Paras + Bata Gosok Diukir m2 280,000.00
66 Membuat Sanggah Kemulan Batu Hitam 40cm x 90cm Atap Ijuk Unit 350,000.00
67 Membuat Sanggah Kemulan Batu Hitam 40cm x 90cm Atap Genteng Unit 300,000.00
68 Membuat Sanggah Kemulan Paras Bata 40cm x 90cm Atap Ijuk Unit 350,000.00
69 Membuat Sanggah Kemulan Paras Bata 40cm x 90cm Atap Genteng Unit 300,000.00
70 Membuat Sanggah Pertiwi Batu Hitam Atap Ijuk 190cm x 190cm Unit 800,000.00
71 Membuat Sanggah Pertiwi Batu Hitam Atap Genteng 190cm x 190cm Unit 700,000.00
72 Membuat Sanggah Pertiwi Paras Bata Atap Ijuk 190cm x 190cm Unit 750,000.00
73 Membuat Sanggah Pertiwi Paras Bata Atap Genteng 190cm x 190cm Unit 750,000.00
74 Membuat Sanggah Hyang Ibu Batu Hitam Atap Ijuk 200cm x 200cm Unit 1,550,000.00
75 Membuat Sanggah Hyang Ibu Batu Hitam Atap Genteng 200cm x 200cm Unit 1,550,000.00
76 Membuat Sanggah Hyang Ibu Paras Bata Atap Ijuk 200cm x 200cm Unit 1,550,000.00
77 Membuat Sanggah Hyang Ibu Paras Bata Atap Genteng 200cm x 200cm Unit 1,550,000.00
78 Membuat Sanggah Taksu Batu Hitam Atap Ijuk 40cmx40cm Unit 300,000.00
79 Membuat Sanggah Taksu Batu Hitam Atap Genteng 40cm x 40cm Unit 300,000.00
80 Membuat Sanggah Taksu Paras Bata Atap Ijuk 40cm x 40cm Unit 300,000.00
81 Membuat Sanggah Taksu Paras Bata Atap Genteng 40cm x 40cm Unit 300,000.00
82 1 Titik Instalasi Stop Kontak, Lampu Exhaust Fan dan Celling Pan titik 65,000.00
83 1 Tititk Instalasi AC titik 65,000.00
84 1 Titik Instalasi Telephone titik 65,000.00
85 1 Titik Instalasi MATV titik 65,000.00
100,000.00

Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2019

NO URAIAN PEKERJAAN HARGA

1 2 3
I HARGA SATUAN PEKERJAAN PERSIAPAN (PERMEN PUPR 28/PRT/M/2016)
1 1 M2 PAGAR SEMENTARA DARI KAYU TINGGI 2 METER Rp. 84,713.00
2 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER Rp. 82,188.00
3 1 M2 PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER Rp. 64,300.00
4 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK Rp. 24,860.00
5 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN Rp. 830,300.00
6 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT Rp. 416,475.00
7 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU Rp. 320,850.00
8 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN Rp. 17,700.00
9 1 M2 PEMBUATAN BEDENG BURUH Rp. 665,850.00
10 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X25) CM Rp. 37,302.00
11 1 M2 PEMBUATAN STEGGER DARI BAMBU Rp. 371,500.00
12 1 M2 PEMBUATAN JALAN SEMENTARA Rp. 179,000.00
13 1 M3 BONGKARAN BETON BERTULANG Rp. 1,579,988.00
14 1 M3 BONGKARAN DINDING TEMBOK BATA Rp. 789,994.00
15 1 M2 PEMASANGAN PAGAR KAWAT JARING GALVANIS PANJANG 240 CM Rp. 10,854.00
16 1 M2 PEMASANGAN PANEL BETON PRACETAK 5X50X240 CM UNTUK PAGAR Rp. 191,252.00
17 BONGKAR 1 M3 BETON SECARA KONVENSIONAL Rp. 450,000.00

II HARGA SATUAN PEKERJAAN TANAH (PERMEN PUPR 28/PRT/M/2016)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER Rp. 87,250.00
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER Rp. 106,650.00
3 1 M3 GALIAN TANAH BIASA DALAM 3 METER Rp. 126,310.00
4 1 M3 GALIAN TANAH KERAS DALAM 1METER Rp. 116,160.00
5 1 M3 GALIAN TANAH CADAS DALAM 1 METER Rp. 175,800.00
6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER Rp. 140,250.00
7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER Rp. 6,250.00
8 1 M3 PEMBUANGAN TANAH SEJAUH 30 METER Rp. 38,260.00
9 1 M3 PENGURUGAN KEMBALI GALIAN TANAH Rp. 62,500.00
10 1 M3 PEMADATAN TANAH ( Per 20 Cm ) Rp. 62,500.00
11 1 M3 URUGAN PASIR Rp. 268,900.00
12 1 M3 PEMASANGAN LAPISAN PUDEL CAMPURAN 1KP : 3PP : 7TL Rp. 236,600.00
13 1 M2 PEMASANGAN LAPISAN IJUK TEBAL 10 CM Rp. 18,750.00
14 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan Rp. 31,250.00
15 1 M3 TIMBUNAN PASIR SEBAGAI BAHAN PENGISI Rp. -

III HARGA SATUAN PEKERJAAN PONDASI (PERMEN PUPR 28/PRT/M/2016)


1 1 M3 BATU BELAH CAMP. 1 SP : 3 PP Rp. 875,400.00
2 1 M3 BATU BELAH CAMP. 1 SP : 4 PP Rp. 834,175.00
3 1 M3 BATU BELAH CAMP. 1 SP : 5 PP Rp. 805,585.00
4 1 M3 BATU BELAH CAMP. 1 SP : 6 PP Rp. 785,490.00
5 1 M3 BATU BELAH CAMP. 1 SP : 8 PP Rp. 757,935.00
6 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1SP : 1KP : 2PP Rp. 501,937.50
7 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1SP : 3KP : 10PP Rp. 700,655.00
8 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1/4 SP : 1KP : 4PP Rp. 715,414.00
9 1 M3 PASANGAN PONDASI SIKLOP, 60% BETON CAMPURAN 1 SP : 2 PB : 3 KR DAN 40% BATU BELAH Rp. 2,397,381.00
10 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M 973,876.00
11 1 M3 PASANGAN BATU KOSONG 472,005.00
IV PEKERJAAN DINDING (PERMEN PUPR 28/PRT/M/2016))
1 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS Rp. 80,057.50
2 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS Rp. 74,762.50
3 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS Rp. 71,820.00
4 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS Rp. 69,975.00
5 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS Rp. 69,135.00
6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS Rp. 67,075.00
7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SP : 3 KP : 10 PP Rp. 64,575.00
8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SP : 3 KP : 10 PP Rp. 64,575.00
9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SM : 1 KP : 2 PP Rp. 54,237.50
10 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 2 PP Rp. 169,225.00
11 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 3 PP Rp. 157,152.50
12 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 4 PP Rp. 149,582.50
13 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 5 PP Rp. 146,080.00
14 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 6 PP Rp. 145,755.00
15 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 3 KP : 10 PP Rp. 128,887.50
16 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 20), campuran spesi 1 pc : 3 ps Rp. 183,154.00
17 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 20), campuran spesi 1 psp : 4 pp Rp. 282,249.00
18 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 15), campuran spesi 1 psp : 3 pp Rp. 261,291.00
19 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 15), campuran spesi 1 psp : 4 pp Rp. 262,496.00
20 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 psp : 3 pp Rp. 183,154.00
21 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 psp : 4 pp Rp. 183,154.00
22 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 3 Ps Rp. 69,475.00
23 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 4 Ps Rp. 69,475.00
24 1 M2 PASANGAN DINDING Bata Berongga Ekspose (12 x 11 x 24) CM camp 1 Pc : 3 PP Rp. 69,475.00
25 1 M2 PASANGAN DINDING BATA RINGAN TEBAL 7.5 CM DENGAN MORTAR SIAP PAKAI Rp. 239,880.00
26 1 M2 PASANGAN DINDING BATA RINGAN TEBAL 10 CM DENGAN MORTAR SIAP PAKAI Rp. 248,070.00

V PEKERJAAN PLESTERAN (PERMEN PUPR 28/PRT/M/2016)


1 1 M2 PLESTERAN CAMP. 1 PC : 1 PP TEBAL 15 MM Rp. 77,345.00
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM Rp. 71,605.00
3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM Rp. 69,190.00
4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM Rp. 67,485.00
5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM Rp. 66,595.00
6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM Rp. 65,850.00
7 1 M2 PLESTERAN CAMP. 1 PC : 7 PS TEBAL 15 MM Rp. 65,465.00
8 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM Rp. 65,080.00
9 1 M2 PLESTERAN CAMP. 1 PC : 2PP TEBAL 20 MM Rp. 95,805.00
10 1 M2 PLESTERAN CAMP. 1 PC : 3PS TEBAL 20 MM Rp. 75,735.00
11 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM Rp. 91,415.00
12 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM Rp. 90,240.00
13 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM Rp. 89,125.00
14 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM Rp. 88,060.00
15 1 M2 PLESTERAN CAMP. 1 PC : 1 KP : 2 PS TEBAL 20 MM Rp. 88,060.00
16 1 M2 PLESTERAN BERAPEN 1 PS : 5PP TEBAL 15 MM Rp. 39,455.00
17 1 M' PLESTERAN SKONING 1 PC : 3 PS, TEBAL 10 MM Rp. 63,500.00
18 1 M2 PLESTERAN GRANIT 1 SP : 2 GRANIT TEBAL 1 CM Rp. 3,319,410.00
19 1 M2 PLESTERAN TRASO 1 SP : 2 TRASO TEBAL 1 CM Rp. 3,319,410.00
20 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS Rp. 54,890.00
21 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH Rp. 31,270.00
22 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE Rp. 14,845.00
23 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS Rp. 65,030.00
24 1 M2 PLESTERAN MENGGUNAKAN SEMEN MU - 301, TEBAL 10 MM Rp. 72,960.00
25 1 M2 ACIAN MENGGUNAKAN SEMEN MU - 200,TEBAL 1,5MM Rp. 72,960.00
26 1 M2 PEKERJAAN ACIAN Rp. 40,412.50
VI PEKERJAAN KAYU (PERMEN PUPR 28/PRT/M/2016)
1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I Rp. 13,974,500.00
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS III Rp. 3,026,500.00
3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II Rp. 555,265.00
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III Rp. 175,265.00
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS II Rp. 886,000.00
6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS II Rp. 631,200.00
7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS II Rp. 1,114,000.00
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm) Rp. 774,640.00
9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS II Rp. 830,140.00
10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS II Rp. 944,290.00
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I Rp. 583,740.00
12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II Rp. 674,205.00
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS II Bentang 6 M' Rp. 2,092,800.00
14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I Rp. 14,837,400.00
15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II Rp. 11,699,200.00
16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II Rp. 29,000.00
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II Rp. 29,000.00
18 MEMASANG 1 M2 USUK EXPOSE KAYU KLS I KAMPER Rp. 29,000.00
19 MEMASANG 1 M2 RENG KAYU KLS I KAMPER Rp. 29,000.00
20 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II Rp. 33,000.00
21 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II Rp. 68,100.00
22 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II Rp. 66,150.00
23 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS II Rp. 57,310.00
24 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS II Rp. 56,750.00
25 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II Rp. 77,465.00
26 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II Rp. 86,425.00
27 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II Rp. 111,260.00
28 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA HOLO Rp. 86,425.00
29 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA HOLO Rp. 323,810.00
30 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I Rp. 312,582.50
31 MEMASANG 1 M2 LAMBRIZIRING DARI CONWOOD UKURAN (100 x 3050 x 11 mm) Rp. 13,375.00
32 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM Rp. 85,375.00

VII PEKERJAAN BETON ( PERMEN PUPR 28/PRT/M/2016))


1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87 Rp. 965,104.29
2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78 Rp. 999,610.98
3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72 Rp. 1,025,847.62
4 MEMBUAT 1 M³ LANTAI KERJA BETON MUTU F'C = 7,4 MPA SLUMP (3-6)CM, W/C =0.87 Rp. 892,807.33
5 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66 Rp. 1,079,327.70
6 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61 Rp. 1,108,398.78
7 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58 Rp. 1,132,435.32
8 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56 Rp. 1,145,408.12
9 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53 Rp. 1,167,826.43
10 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52 Rp. 1,174,632.65
11 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49 Rp. 1,263,712.72
12 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48 Rp. 1,272,713.76
13 PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR Rp. 12,491.50
14 PEMBESIAN 1 KG kabel prategang (prestressed) polos/strands Rp. 11,841.50
15 PEMBESIAN 1 KG DENGAN BESI POLOS Rp. 3,059.00
16 Pemasangan 10 Kg jaring kawat baja (wiremesh) Rp. 10,280.00
17 1 M2 PASANG BEKISTING UNTUK PONDASI Rp. 184,410.00
18 1 M2 PASANG BEKISTING UNTUK SLOOF Rp. 194,410.00
19 1 M2 PASANG BEKISTING UNTUK KOLOM Rp. 333,780.00
20 1 M2 PASANG BEKISTING UNTUK BALOK Rp. 346,230.00
21 1 M2 PASANG BEKISTING UNTUK PLAT LANTAI Rp. 365,780.00
22 1 M2 PASANG BEKISTING UNTUK DINDING Rp. 342,530.00
23 1 M2 PASANG BEKISTING UNTUK TANGGA Rp. 311,530.00
24 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON Rp. 91,765.00
25 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM) Rp. 57,378.00
26 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM) Rp. 70,519.00
27 1 M2 BEKISTING DINDING BETON BIASA DENGAN MULTIFLEX 12 mm *2 kali pakai* Rp. 58,500.00
28 1 M2 BEKISTING PONDASI DAN SLOOF BETON BIASA MENGGUNAKAN PAPAN 3/20 CM *2 kali pakai* Rp. 69,795.00
29 1 M2 PERANCAH/PENYOKONG BEKISTING DINDING BETON MENGGUNAKAN KAYU 5/7 ,Tinggi Maks 2,5 m *2 kali pakai* Rp. 67,770.00
30 1 M2 PERANCAH/PENYOKONG BEKISTING PONDASI DAN SLOOF BETON MENGGUNAKAN KAYU 5/7 ,Tinggi Maks 2,0 m *2 kali pakai* Rp. 42,150.00
VIII HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM (PERMEN PUPR 28/PRT/M/2016)
1 1 KG PEMASANGAN BESI PROFIL Rp. 14,400.00
2 1 KG PEMASANGAN RANGKA KUDA-KUDA BAJA IWF Rp. 14,400.00
3 100 KG PENGERJAAN PEKERJAAN PERAKITAN Rp. 14,400.00
4 1 M2 PEMASANGAN PINTU ROLLING DOOR BESI Rp. 280,980.00
5 1 M2 PEMASANGAN ROLLING DOOR ALLUMINIUM Rp. 245,000.00
6 1 M2 PEMASANGAN KUSEN PINTU ALLUMINIUM Rp. 10,528.50
7 1 M2 PEMASANGAN PINTU ALLUMINIUM STRIP LEBAR 8 CM Rp. 20,818.50
8 1 M2 PEMASANGAN RANGKA BESI HOLLOW 1 X40.40.2MM, MODUL 60 X 120 CM, UNTUK PARTISI Rp. 61,315.00
9 1 M2 PEMASANGAN RANGKA BESI HOLLOW 1 X40.40.2MM, MODUL 60 X 120 CM, UNTUK PLAFON Rp. 278,315.00
10 1 M2 PEMASANGAN ATAP PELANA RANGKA ATAP BAJA CANAI DINGIN PROFIL C75 Rp. 297,825.50
11 1 M2 PEMASANGAN ATAP JURAI RANGKA ATAP BAJA CANAI DINGIN PROFIL C75 Rp. 342,215.80

IX PEKERJAAN PENUTUP ATAP (PERMEN PUPR 28/PRT/M/2016)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG Rp. 104,885.00
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT Rp. 27,385.00
3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG Rp. 125,740.00
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM Rp. 75,100.00
5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M Rp. 25,798.00
6 1 M2 PASANGAN LAPISAN ALUMINIUM FOIL Rp. 8,096.00
7 1 M1 PASANG NOK SENG GELOMBANG Rp. 27,270.00
8 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU Rp. 101,866.25

X PEKERJAAN PLAFOND / LANGIT - LANGIT (PERMEM PUPR 28/PRT/M/2016))


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM Rp. 12,915.00
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/3 MM, 4MM, 6MM Rp. 25,040.00
3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING Rp. 338,680.00
4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL Rp. 12,535.00
5 1 M1 PASANG LIST LANGIT-LANGIT GYPSUM PROFIL Rp. 12,315.00
6 1 M2 PASANG LANGIT-LANGIT AKUSTIK UKURAN (60 x 120) CM + RANGKA ALUMINIUM Rp. 122,500.00
7 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA Rp. 62,890.00
8 1 M2 PLAFOND GYPSUM, RANGKA KAYU Rp. 251,318.00
9 1 M2 PLAFOND GYPSUM, RANGKA HOLO Rp. 136,585.50
10 1 M2 PLAFOND KALSIBOARD, RANGKA KAYU Rp. 251,318.00
11 1 M2 PLAFOND KALSIBOARD, RANGKA HOLO Rp. 118,385.50

XI PEKERJAAN SANITASI ( PERMEN PUPR 28/PRT/M/2016) )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK Rp. 517,015.00
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN Rp. 487,450.00
3 MEMASANG 1 BUAH URINOIR Rp. 261,150.00
4 MEMASANG 1 BUAH WASHTAFEL KIA Rp. 341,050.00
5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3 Rp. 588,500.00
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 " Rp. 20,943.00
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3" Rp. 35,568.00
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5" Rp. 11,856.00
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2" Rp. 17,823.00
10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" Rp. 26,669.50
11 MEMASANG 1 M1 PIPA PVC TYPE AW f 4" Rp. 26,669.50
12 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5" Rp. 12,650.00
XII PEKERJAAN BESI DAN ALUMINIUM (PERMEN PUPR 28/PRT/M/2016)
1 1 KG MEMASANG RANGKA BAJA IWF Rp. 8,301.00
2 1 M2 PASANG JENDELA NAKO & TRALIS Rp. 227,830.00
3 1 M1 PASANG TALANG DATAR, SENG BJLS 28 Rp. 72,845.00

XIII PEKERJAAN KUNCI DAN KACA PERMEN PUPR 28/PRT/M/2016)


1 1 BH PASANG KUNCI TANAM BIASA Rp. 310,000.00
2 1 PS PASANG ENGSEL PINTU Rp. 68,065.00
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU Rp. 57,800.00
4 1 BH PASANG KAIT ANGIN Rp. 46,630.00
5 1 BH PASANG KUNCI SLOT Rp. 32,000.00
6 1 M2 PASANG KACA, TEBAL5 MM Rp. 55,760.00
7 1 M2 PASANG KACA TEMPERED TEBAL 5 MM Rp. 55,760.00
8 1 M2 PASANG KACA TEMPERED TEBAL 6 MM Rp. 55,760.00
9 1 M2 PASANG KACA TEMPERED TEBAL 12 MM Rp. 55,760.00

XIV PEKERJAAN PENUTUP LANTAI DAN DINDING (PERMEN PUPR 28/PRT/M/2016)


1 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (40 X 40) CM Rp. 65,990.00
2 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (30 X 30) CM Rp. 66,240.00
3 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (20 X 20) CM Rp. 70,260.00
4 1 M2 PASANG LANTAI UBIN WARNA UKURAN (40 X 40) CM Rp. 67,485.00
5 1 M2 PASANG LANTAI UBIN WARNA 30 X 30 CM Rp. 69,430.00
6 1 M2 PASANG LANTAI UBIN WARNA 20 X 20 CM Rp. 71,870.00
7 1 M2 PASANG LANTAI UBIN TERASO UKURAN 40 X 40 CM Rp. 337,310.00
8 1 M2 PASANG LANTAI UBIN TERASO UKURAN 30 X 30 CM Rp. 382,255.00
9 1 M2 PASANG LANTAI UBIN GRANIT UKURAN 40 X 40 CM Rp. 337,310.00
10 1 M2 PASANG LANTAI UBIN GRANIT UKURAN 30 X 30 CM Rp. 382,255.00
11 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40 X 40 CM Rp. 337,885.00
12 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30 X 30 CM Rp. 382,255.00
13 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60 X 60 CM Rp. 65,295.00
14 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM Rp. 149,900.00
15 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 15 CM X 20 CM Rp. 25,037.50
16 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 10 CM X 30 CM Rp. 24,310.00
17 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 10 CM X 40 CM Rp. 24,310.00
18 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 20 CM Rp. 24,185.00
19 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 30 CM Rp. 24,185.00
20 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 40 CM Rp. 24,185.00
21 1 M' PASANGPLINT UBIN TERASO UKURAN 10 CM X 30 CM Rp. 24,185.00
22 1 M' PASANG PLINT UBIN TERASO UKURAN 10 CM X 40 CM Rp. 24,185.00
23 1 M' PASANG PLINT UBIN GRANIT UKURAN 10 CM X 40 CM Rp. 24,185.00
24 1 M' PASANG PLINT UBIN GRANIT UKURAN 10 CM X 30 CM Rp. 24,185.00
25 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 CM X 40 CM Rp. 24,185.00
26 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 CM X 30 CM Rp. 24,185.00
27 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 60 CM Rp. 24,185.00
28 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 40 CM Rp. 24,185.00
29 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 30 CM Rp. 24,185.00
30 1 M2 PASANG LANTAI KERAMIK UKURAN 33 CM X 33 CM Rp. 42,103.68
31 1 M2 PASANG LANTAI KERAMIK UKURAN 30 CM X 30 CM Rp. 92,365.00
32 1 M2 PASANG LANTAI KERAMIK UKURAN 20 CM X 20 CM Rp. 140,225.00
33 1 M2 PASANG LANTAI KERAMIK UKURAN 10 CM X 33 CM Rp. 203,210.00
34 1 M2 PASANG LANTAI KERAMIK MOZAIK UKURAN 30 CM X 30 CM Rp. 144,912.50
35 1 M' PASANG PLINT KERAMIK UKURAN 10 CM X 20 CM Rp. 26,530.00
36 1 M' PASANG PLINT KERAMIK UKURAN 10 CM X 10 CM Rp. 26,530.00
37 1 M' PASANG PLINT KERAMIK UKURAN 5 CM X 20 CM Rp. 25,817.50
38 1 M2 PASANG DINDING KERAMIK 10 CM X 20 CM Rp. 175,200.00
39 1 M2 PASANG DINDING KERAMIK 20 CM X 20 CM Rp. 175,200.00
40 1 M2 PASANG DINDING MARMER 100 CM X 100 CM Rp. 251,825.00
41 1 M2 PEMASANGAN PAVING BLOCK NATURAL Tebal 6 cm ( 20x20 cm) Rp. 91,419.00
42 1 M2 PEMASANGAN PAVING BLOCK BERWARNA Tebal 6 cm ( 20x20 cm) Rp. -
43 1 M2 PEMASANGAN PAVING BLOCK BERWARNA Tebal 8 cm ( 20x20 cm) Rp. -
44 1 M2 PEMASANGAN PAVING BLOCK NATURAL Tebal 8 cm ( 20x20 cm) Rp. -
XV PEKERJAAN PENGECATAN (PERMEN PUPR 28/PRT/M/2016)
1 1 M2 PEKERJAAN MENGIKIS ATAU MENGEROK CAT TEMBOK CARA MANUAL Rp. 17,840.00
2 1 M2 PEKERJAAN LAPIS PLAMIR Rp. 6,165.00
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) Rp. 10,534.50
4 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN KUAS Rp. 13,435.00
5 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN ROLL Rp. 8,535.00
6 1 M2 PEKERJAAN PENGECATAN LANGIT -LANGIT 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN KUAS TERMASUK PLAMIR Rp. 17,070.00
7 1 M2 PEKERJAAN PENGECATAN PLAFOND 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN ROLL Rp. 24,620.00
8 1 M2 WATERPROOFING Rp. 22,340.00
9 1 M2 PEKERJAAN PASANG WALL PAPER DENGAN PEREKAT SILK HOUSE Rp. 14,420.00
10 1 M2 PEKERJAAN MELAPIS MENI KAYU Rp. 8,920.00
11 1 M2 PEKERJAAN MENDEMPUL ATAU MEMPLAMIR DAN MENGGOSOK KAYU Rp. 18,915.00
12 1 M2 PEKERJAAN PENGECATAN DASAR 1 LAPIS PADA KAYU Rp. 28,895.00
13 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA KAYU Rp. 63,015.00
14 1 M2 PEKERJAAN MENGEROK KARAT ATAU CAT PADA PERMUKAAN BAJA DENGAN SODA API Rp. 38,050.00
15 1 M2 PEKERJAAN MELAPIS MENI PADA PERMUKAAN BAJA Rp. 15,570.00
16 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA SECARA MANUAL Rp. 41,015.00
17 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA/KAYU DENGAN SEMPROT Rp. 23,735.00
18 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN TEAK OIL Rp. 15,300.00
19 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN POLITUR 2 LAPIS Rp. 84,515.00
20 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN VERNIS 2 LAPIS Rp. 15,350.00
21 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN RESIDU/TER Rp. 12,850.00

XIV PEKERJAAN ELEKTRIKAL (PERMEN PUPR 28/PRT/2016)


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN Rp. 293,000.00
2 1 TITIK INSTALASI AC Rp. 276,000.00
3 1 TITIK INSTALASI TELEPHONE Rp. 202,000.00
4 1 TITIK INSTALASI MATV Rp. 120,000.00
5 1 TITIK PEMASANGAN LAMPU Rp. -

XV PEKERJAAN ANGKUT MATERIAL DAN/ ATAU HASIL GALIAN (PERMEN PUPR 28/PRT/M/2016)

1 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 50 M' Rp 50,007.00
2 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 100 M' Rp 67,200.00
DAFTAR HARGA BAHAN
PADA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KOTA DENPASAR TAHUN 2020

HARGA
NO NAMA BAHAN SAT
(RP)
1 2 3 4
BATU KALI DAN BATU ALAM
1 Batu Kali/batu bulat 15-30 cm m3 305,000.00
2 Batu Belah 1.0-5.0 cm m3 345,000.00
3 Batu Pecah Besar 15/30 cm m3 205,000.00
4 Batu Pecah 5/7 cm m3 310,000.00
5 Batu Pecah 3/5 cm m3 316,000.00
6 Batu Pecah 3-4 cm m3 335,000.00
7 Batu Pecah 2/3 cm m3 396,000.00
8 Batu Pecah Mesin 1 - 2 cm m3 475,000.00
9 Batu Pecah 2-3 cm m3 -
10 Batu Pecah 1 - 2 cm m3 -
11 Batu Pecah 0,5 - 1 Cm m3 -
13 Batu Alam Andesit Alur m2 -
14 Batu Alam Live Grendia m2 -
15 Batu Candi m2 -
16 Batu Candi Hitam (Ukuran 30 x 30 x 2 Cm) Cirebon m2 -
17 Batu Candi Hitam (Ukuran 30 x 30 x 3 Cm) Cirebon m2 -
18 Batu Candi Hitam (Ukuran 30 x 30 x 5 Cm) Cirebon m2 -
19 Batu Candi Hitam (Ukuran 20 x 20 x 2 Cm) Cirebon m2 -
20 Batu Candi Hitam (Ukuran 20 x 30 x 5 Cm) Cirebon m2 -
21 Batu Putih Jogya / Palimanan (30 x 30 x 2 Cm) m2 -
22 Batu Putih Jogya / Palimanan (30 x 30 x 3 Cm) m2 -
23 Batu Putih Jogya / Palimanan (30 x 30 x 5 Cm) m2 -
24 Batu Alam Palimanan Putih Super m2 -
25 Batu hitam Jember 5 x 20 halus m2 -
26 Batu hitam Jember 20 x 40 halus m2 -
27 Batu hitam Jember 15 x 30 halus m2 -
28 Batu hitam Singaraja 15 x 30 halus m2 -
29 Batu hitam Singaraja 20 x 40 halus m2 -
30 Batu hitam karangasem/Batu Tabas (20 x 40 x 3) m2 -
31 Paras Silakarang Tipis (Ukuran 15 x 30 x 5 Cm) m2 -
32 Paras Silakarang Tebal (Ukuran 15 x 30 x 8 Cm) m2 -
33 Batu Paras Bali/Pawon (Abu - Abu Terang) m2 -
34 Paras Kelating / Kerobokan (Ukuran 3 x 20 x 40 Cm) bh -
35 Batu pilah m2 -
36 Batu pilah Singaraja 30 x 30 m2 -
37 Batu pilah Singaraja 20 x 20 m2 -
38 Split Kasar m3 -
39 Split Halus m3 -
40 Koral Beton diameter 1 - 2 cm m3 412,000.00
41 Batu Sikat Hitam Lokal Super kampil -
42 Batu Sikat Akik Merah kampil -
43 Batu Sikat Putih Salju kampil -
44 Koral Sikat (Lokal) sak -
45 Kerikil m3 410,000.00
46 Kerikil Beton m3 500,000.00
47 Kerikil Halus m3 420,000.00
48 Pasir Halus m3 258,000.00
49 Pasir Pasang m3 215,000.00
50 Pasir Beton m3 195,000.00
51 Pasir Urug m3 195,000.00
52 Tanah Urug m3 149,000.00
53 Tanah Urug Pilihan m4 -
54 Tanah Lempung m3 -
55 Sirtu m3 -
56 Batu Karang Bukit m3 -
57 Limestone m3 -
58 Abu Bata -
59 Batako Lubang bh -
60 Batako Buntu bh 2,800.00
61 Batu Bata bh -
62 Bata Ringan setara falcon uk. 75 x 200 x 500 mm m3 -
63 Bata Ringan setara falcon uk. 100 x 200 x 600 mm m3 -
64 Bata Ringan setara falcon uk. 125 x 200 x 600 mm m3 -
65 Bata Ringan setara falcon uk. 150 x 200 x 600 mm m3 -
66 Bata Merah Klas I bh -
67 Bata Merah Klas II bh -
68 Bata Merah Klas III bh -
69 Bata Merah Super (Pripian) ex tulikup bh -
70 Bata Pres 22x10x6cm bh -
71 Bata Pres 22x10x5cm bh -
72 Batu Gosok bh -
73 Filler kg -
74 Additive liter -
75 Agregat m3 -
76 Closeter bh -
77 Lis Batu Alam L=7, T=40 bh -
78 Lem Batu Alam kaleng -
79 Coating (CP.27) kaleng -

SEMEN
80 PC. Tiga Roda 50 Kg sak 75,000.00
81 PC Tiga Roda 40 Kg sak 50,000.00
82 PC. Tonasa 50 Kg / Busoa 50 Kg sak 47,000.00
83 PC. Gresik 40 Kg sak 50,000.00
84 PC. Gresik 50 Kg sak 63,000.00
85 PC Rajawali 40 Kg sak -
86 PC Holcim 40 Kg sak -
87 PC Conch 40 Kg sak -
88 Semen Gresik kg 1,250.00
89 Semen Tiga Roda kg -
90 Semen Tonasa kg -
91 Semen Bosowa kg -
92 Semen Holcim kg -
93 Semen Conch kg -
94 Semen Warna MU 408/ Nat kg -
95 Semen Tipe V kg -
96 Semen Portland kg -

Mortar Utama
97 ThinBedMAX/Perekat Bata Ringan (MU 380) @40 Kg sak -
98 PlasterPlus/Pas. Bata & Plester (MU-301) @40 kg sak -
99 Plester premium (MU-100)@ 40 kg sak -
100 Finish Plesteran/ Render (MU 290)@ 40 kg sak -
101 SkimWall/Acian Plesteran & Beton (Skimcoat) 20 kg (MU-200) sak -
102 SkimWall/Acian Plesteran & Beton (Skimcoat) 40 kg (MU-200) sak -
103 Acian Putih (MU-270)@25 kg sak -
104 Perata Lantai (MU-440)@40kg sak -
105 Perata Lantai Expose (MU 445) 40 kg sak -
106 Self Leveling Floor /Underlayment (MU-410) @25kg sak -
107 Primer Self Leveling Floor (MU-L410) @ 5lt Set -
108 Floor Hardener (MU 700) 25 kg sak -
109 Granitfix/Perekat Granite Tile & Batu Alam (MU-400) @25kg sak -
110 Cerafix/Perekat Keramik (MU-420)@25 kg sak -
111 Poolfix White/Perekat keramik area terendam (MU-460)@25 kg sak -
112 Renofix/Perekat keramik diatas keramik (MU-480)@25 kg sak -
113 Powerfix Flex/Perekat keramik serba guna (MU-485)@25 kg sak -
114 Rapidfix Flex/Perekat keramik Fast Setting (MU-490)@25 kg sak -
115 Colorfill/ Pengisi nat interior & eksterior (MU-408C) kg -
116 ColorPlus/Pengisi nat interior,eksterior,area basah(MU-408P) kg -
117 Glliter/Pengisi nat dengan efek Glliter (MU-408G)@ 2kg set -
118 PowerPool/Pengisi nat area terendam(MU-408PP)@2kg set -
119 FixGrout/Perbaikan struktur beton (MU-800)@20kg sak -
120 PatchCrete/Perbaikan permukaan beton(MU-830)@40kg sak -
121 SkimRep/Perbaikan permukaan acian(MU-840)@25kg sak -
122 DryShield/Pelapis kedap air (MU-600)@3kg set -
123 ArcyBond/Perekat Mortar & Beton akrilik (MU-L500)@900ml set -
Uzin
124 Beton Instan (UZ K300) 50 kg sak -
125 Plester dinding instan (UZ Plester) 50 Kg sak -
126 Plester Finish tanpa Aci (UZ Render) 50 kg sak -
127 Acian diatas beton (UZ SC100) 40 kg sak -
128 Acian dinding instan interior (UZ SC 50) 40 kg sak -
129 Acian dinding instan eksterior (UZ SC 75) 40 kg sak -
130 Perekat Bata Ringan (UZ TB20) 50 kg sak -

Bostik
Perekat Keramik & Batu Alam
131 Fix Crete 25kg sak -
132 Fix all 20kg sak -
133 Super Fix all 20kg sak -
134 Super Fix all trade/white 20kg sak -
135 Asaflex 45 kg (15lt +30 kgp) set -
136 Mortar Fix 100kg set -
137 Mortar Fix 50 kg set -
138 Mortar Fix 5 kg set -
139 Renofix 25 kg Zak -
140 Grout ( Semen Nat) 20 kg sak -
141 Grout ( Semen Nat) 1 kg sak -
142 Liquid Grout Adictive (LGA) 20 Lt pail -
143 Mega Lastic Acrilic Base 20Lt pail -

Wall System
144 Skim Plas 25 Kg sak -
145 Skim Crete 25 Kg sak -
146 Fix. Plas 40 kg sak -
147 Fix T. 40 kg sak -

Waterproofing
148 Ultra Coat RC2 20 Lt pail -
149 Boscosem Slury 33 Kg set -
150 Damplix 2 20 kg set -
151 Damplix 3 45 kg set -
152 Damplix 3E 35 kg set -
153 Boscoseal Tom (Wp membran Bakar) Uk. 1m x 10 m rol -
154 Indo primer ( lapisan primer WP membran) 20 Lt pail -
155 Integral Kristalisasi (Waterproofing kristal) 20 kg pail -
156 Sika Top Seal Set 20 kg + cairan set -

Sealent
156 No More Nail (320 GR) bh -
157 Seal n Flex 1 (600 ML) bh -
158 Boscosil 313 (300 ML) bh -
159 Boscosil 616 (300 ML) bh -
160 Fil A Gap (300 ML) bh -
161 Boscosil Mastic (300 ML) khusus R. Pendingin bh -
162 Bostik Z Bond 6S (300 ML) bh -
163 Bostik Z PU Contrcuction (600 ML) bh -
164 Quelyd Super Express (250 GR) bh -
165 Expanda Foam (340 GR) bh -
166 Barel Gun bh -
167 Flash Band rol -

BAMBU
168 Bambu Ukuran 8"- 10" panjang 4 m btg -
169 Bambu Ukuran 3"-6" panjang 4 m btg -
170 Gedeg kulit kelas I m2 -
171 Gedeg kulit kelas II m2 -
172 Gedeg Biasa m2 -
KAYU
173 Kayu jati Balok Ex Bojonegoro m3 9,500,000.00
174 Kayu jati papan ex Bojonegoro m3 -
175 Kayu jati Usuk m3 -
176 Kayu jati Reng m3 -
177 Kayu merbau Balok m3 -
178 Kayu merbau papan m3 -
179 Kayu kamper balok m3 -
180 Kayu kamper usuk/reng m3 -
181 Kayu kamper papan m3 9,500,000.00
182 Kayu Profil 4/5 kamper m' -
183 List Kayu m' -
184 List profil 2/4 kamper m' -
185 Kayu kruing balok m3 -
186 Kayu kruing papan m3 -
187 Kayu Usuk Kruing m3 7,450,000.00
188 Kayu Reng Kruing m3 -
189 Kayu Papan Meranti m3 -
190 Kayu Balok Meranti m3 -
191 Kayu Usuk Meranti m3 -
192 Kayu Reng Meranti m3 -
193 Kayu Bangkirai Papan m3 -
194 Kayu Bangkirai Balok m3 -
195 Kayu Begisting 5/7 m3 -
196 Kayu Seseh Balok m3 4,150,000.00
197 Kayu Dolken / Skapolding m3 8,000.00
198 Kayu Seseh Dolken D 20 Panjang 3 m btg -
199 Kayu Seseh Dolken D 8-10 Panjang 4m btg -
200 Kayu Usuk Albesia 5/7 Panjang 4 m btg -
201 Kayu Reng mekanis Uk 2 x 3 x 400 cm m3 -
202 Kayu Reng mekanis Uk 3 x 5 x 400 cm m3 -
203 Kayu Usuk mekanis Uk 4 x 6 x 400 cm m3 -
204 Kayu Usuk mekanis Uk 5 x 7 x 400 cm m3 -
205 Kayu Balok mekanis Uk. 6 x 12 x 400 cm m3 -
206 Kayu Balok mekanis Uk. 6 x 15 x 400 cm m3 -
207 Kayu Balok mekanis Uk. 6 x 20 x 400 cm m3 -
208 Kayu Kelas III lokal m3 2,000,000.00
209 Kayu 7/7, Kelas III m3 -
210 Kayu Cempaka lokal m3 -
211 Kayu Bakar m3 -
212 Papan Bakesting m3 -
213 Papan Kayu Ulin m3 -
214 Papan Kayu, Kelas II m3 -
215 Balok Kayu Ulin m3 -
216 Lem Aica Aibond kg -
217 Lem Kayu setara Fox ltr 16,000.00
218 Minyak bekisting setara Calform NX*R ltr 45,000.00
219 Jaro bubut bh -
220 Kayu Perancah m3 -

Flooring/ Lantai
221 Parket Jati lokal Uk. 1,2 x 5 x 20 cm m2 -
222 Parket Jati lokal Uk. 1,2 x 5 x 25 cm m2 -
223 Parket Jati lokal Uk. 1,2 x 5 x 30 cm m2 -
224 Jati Eksport Uk. 1,2 x 5 x 20 cm m2 -
225 Jati Eksport Uk. 1,2 x 5 x 25 cm m2 -
226 Jati Eksport Uk. 1,2 x 5 x 30 cm m2 -
227 Jati Eksport Uk. 1,5 x 9 x 30 - 120 cm m2 -
228 Jati Eksport Uk. 1,5 x 12 x 30 - 120 cm m2 -
229 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 20 cm m2 -
230 Parket Kayu Merbau Kelas I Uk. 1 x 5 x 30 cm m2 -
231 Parket Kayu Merbau Kelas I Uk. 1 x 9 x 30 - 120 cm m2 -
232 Parket Kayu Merbau Export Uk. 1 x 9 x 30 - 120 cm m2 -
233 Parket Kayu Merbau Export Uk. 1 x 9 x 60 - 120 cm m2 -
234 Decking Bangkirai Uk. 1,9 x 9 x 180 - 390 cm m2 -
235 Decking Krewing Uk. 1,9 x 9 x 180 - 400 cm m2 -
236 Decking Merbau Uk. 1,9 x 9 x 180 - 400 cm m2 -
237 Decking Ulin Sulawesi Uk. 1,9 x 9 x 200 cm m2 -

Lambersering
238 Lambersering Bangkirai Uk. 1 x 9 x 200 cm m2 -
239 Lambersering Kruing Uk. 2 x 9 x 200 cm m2 -

Lis Kayu
240 Lis plapond kayu mekanis Uk. 1 x 5 x 400 cm btg -
241 Lis Plapond dobel kayu mekanis Uk. 1 x 5 x 400 cm btg -
242 Lis Plapond Uk. 0,8 x 5 x 400 cm btg -
243 Lis Plapond Uk.1 x 3 x 400 cm btg -
244 Lis Plapond tanpa profil Uk. 1 x 5 x 400 cm btg -
245 Lisplang kayu mekanis Uk. 2 x 6 x 400 cm btg -
246 Lisplang kayu mekanis Uk. 2 x 7 x 400 cm btg -
247 Lisplang kayu mekanis Uk. 2 x 8 x 400 cm btg -
248 Lisplang kayu mekanis Uk. 2 x 10 x 400 cm btg -
249 Lisplang kayu mekanis Uk. 2 x 12 x 400 cm btg -
250 Lisplang kayu mekanis Uk. 2 x 15 x 400 cm btg -
251 Lisplang kayu mekanis Uk. 2 x 20 x 400 cm btg -
252 Lis Kaca Uk. 1,5 x 3 cm m' -
253 Lis Dowel Kecil Uk. 1 x 2 cm m' -
254 Lis Dowel Besar Uk. 1,3 x 3 cm m' -
255 Lis Kusen m' -

CONWOOD
Flooring/Deck Application
256 Conwood Deck 4" ( 102 x 3050 x 14 mm) Pcs -
257 Conwood Deck 6" ( 152 x 3050 x 14 mm) Pcs -
258 Conwood Deck 8" ( 203 x 3050 x 14 mm) Pcs -
259 Conwood Deck 4" ( 102 x 3050 x 25 mm) Pcs -
260 Conwood Deck 6" ( 152 x 3050 x 25 mm) Pcs -
261 Conwood Deck 8" ( 203 x 3050 x 25 mm) Pcs -
262 Conwood Deck 12"( 300 x 3050 x 25 mm) Pcs -

Decorative Stair
263 Conwood Stair 8" (Vertical) (200 x 1200 x 16 mm) Pcs -
264 Conwood Stair 12" (Horisontal) (300 x 1200 x 25 mm) Pcs -
265 Conwood Handrail (85 x 3050 x 30 mm) Pcs -

Ceiling Application
266 Celling Border (50 X 3050 X 11 mm) Pcs -
267 Conwood Lath 3" Cut (76 x 3050 x 11 mm) Pcs -
268 Conwood Lath 4" Cut (100 x 3050 x 11 mm) Pcs -
269 Conwood Lath 3"(UG)(600 x 1200 x 8 mm) Pcs -
270 Conwood Lath 3"(UG)(1200 x 2400 x 8 mm) Pcs -

Eave/lisplank
271 Conwood Eave 2 IN 1 (235 x 3050 x 16 mm) Pcs -

Wall Application
272 Conwood Lap Siding 6" BG (152 x 3050 x 11mm) Pcs -
273 Conwood Lap Siding 8" GO (200 x 3050 x 11mm) Pcs -
274 Conwood Decorative Panel (600 x 1200 x 11mm) Pcs -
275 Conwood Decorative Panel " V-Groove" (305 x 3050 x 14mm) Pcs -

Moulding Application
276 Conwood Floor Mould 4" (Louis) (102 x 3050 x 11mm) Pcs -
277 Conwood Floor Mould 4" (Louis) (102 x 3050 x 14mm) Pcs -
278 Conwood Floor Mould 4" (Classic) (102 x 3050 x 11mm) Pcs -
279 Conwood Floor Mould 4" (Classic) (102 x 3050 x 14mm) Pcs -
Decorative Application
280 Conwood Plank 1" (100 x 3050 x 25 mm) Pcs -
281 Conwood Plank 2" (50 x 3050 x 16 mm) Pcs -
282 Conwood Plank 2" (50 x 3050 x 25 mm) Pcs -
283 Conwood Sun Shade 3" (76 x 3050 x 14 mm) Pcs -
284 Conwood Fence 4" Arrow - 1M (100x 1000 x 16 mm) Pcs -
285 Conwood Fence 4" Arrow - 1,5M (100x 1500 x 16 mm) Pcs -
286 Conwood Fence 4" Botany - 1M (100x 1000 x 16 mm) Pcs -
287 Conwood Fence 4" Botany - 1,5M (100x 1500 x 16 mm) Pcs -
288 Conwood Fence 4" Classic - 1,5M (100x 1500 x 16 mm) Pcs -
289 Conwood Fence 4" Branch - 1M (100x 1000 x 16 mm) Pcs -

Planks
290 Conwood Plank 8" Textured (200 x 3050 x 8 mm) Pcs -
291 Conwood Plank 8" Plain (200 x 3050 x 8 mm) Pcs -

BESI
292 Mour + Bout bh -
293 Besi strip kg -
294 Besi strip 30x3 mm m' -
295 Baja Strip (0,2 x 2) cm / Plat Strip Kg -
296 Besi Beton U24 (Polos) Kg 9,800.00
297 Besi Beton Ulir U 32 Kg -
298 Besi Ulir 13,0x 12 sni (Ts-40) Kg -
299 Besi Ulir 16,0x 12 sni (Ts-40) kg -
300 Besi Ø5 (3,8 x 6,0) btg -
301 Besi Ø6 (5,0 x 12) btg -
302 Besi Ø6 (5,2 x 12) btg -
303 Besi Ø6 (5,7 x 12) btg -
304 Besi Ø8 (6,5 x 12) btg -
305 Besi Ø8 (6,7 x 12) btg -
306 Besi Ø8 (6,9 x 12) SNI btg -
307 Besi Ø8 (7,1 x 12) SNI btg -
308 Besi Ø8 (7,4 x 12) SNI btg -
309 Besi Ø8 (7,6 x 12) SNI btg -
310 Besi Ø8 (7,7 x 12) SNI btg -
311 Besi Ø8 (7,8 x 12) SNI btg -
312 Besi Ø8 SNI U 24 btg -
313 Besi Ø10 (8,4 x 12) SNI btg -
314 Besi Ø10 (8,6 x 12) SNI btg -
315 Besi Ø10 (8,9 x 12) SNI btg -
316 Besi Ø10 (9,2 x 12) SNI btg -
317 Besi Ø10 (9,4 x 12) SNI btg -
318 Besi Ø10 (9,6 x 12) SNI btg -
319 Besi Ø10 (9,8 x 12) SNI btg -
320 Besi Ø10 SNI U 24 btg -
321 Besi Ø10 Ulir (9,5 x 12) SNI btg -
322 Besi Ø10 Ulir (9,7 x 12) SNI btg -
323 Besi Ø12 (11,5 x 12) SNI btg -
324 Besi Ø13 Ulir (11,5 x 12) SNI btg -
325 Besi Ø13 Ulir (11,7 x 12) SNI btg -
326 Besi Ø13 Ulir (12,0 x 12) SNI btg -
327 Besi Ø13 Ulir (12,5 x 12) SNI btg -
328 Besi Ø13 Ulir (12,7 x 12) SNI btg -
329 Besi Ø16 Ulir (14 x 12) SNI btg -
330 Besi Ø16 Ulir (14,5 x 12) SNI btg -
331 Besi Ø16 Ulir (15,0 x 12) SNI btg -
332 Besi Ø16 Ulir (15,5 x 12) SNI btg -
333 Besi Ø16 Ulir (15,7 x 12) SNI btg -
334 Wiremesh M6@50m rol -
335 Wiremesh M7 (D6,5mm) Uk. 2,1 x 5,4 m lbr -
336 Wiremesh M8 (D7,5mm) Uk. 2,1 x 5,4 m lbr -
337 Wermes Diameter 8 (U 50) lbr -
338 Beugel Besi O8 kg -
339 Beugel penguat /plaat kg -
340 Kawat Beton RRT kg 32,000.00
341 Kawat berduri kg -
342 Kawat Ayak / Kuasa 5 X 5 cm m2 -
343 Kawat Harmonika 3 X 3 cm m2 -
344 Kawat Nyamuk m2 -
345 Kawat Jaring m2 -
346 Kawat Bronjong kg -
347 Besi / Baja profil kg -
348 Besi Baja L60 X 60 X 6 / L50 x 50 x 5 kg -
349 Baja WF (150 x 12 GG) btg -
350 Baja WF (200 x 12 GG) btg -
351 Besi Baja WF 200 x 100 x 4,5 x 7 kg -
352 Besi Baja WF 200 x 100 x 5,5x8 kg -
353 Besi Baja WF 250 x 125 x 5 x 7 kg -
354 Besi Baja C 100 x 50 x 3,2 kg -
355 Baja Ringan Type C- 75, 0.8 m' 35,000.00
356 Baja Ringan Type C- 75, 0.6 m' -
357 Reng Baja m' -
358 Profil Canal "C" Tipe C71.075 btg -
359 Profil Canal "C" Tipe C81.075 btg -
360 Profil Canal "C" Tipe C81.065 btg -
361 Profil "Omega / reng Tipe AA btg -
362 Profil "Omega / reng Tipe A btg -
363 Profil "Omega / reng Tipe AB btg -
364 Profil Aluminium Kaca 3/4 m' -
365 Profil Aluminium L 3 cm lis Kaca m' -
366 Profil Aluminium 4" m' -
367 Besi Plat kg -
368 Besi plat 3 X 6 tebal 1,2 mm btg -
369 Besi plat 4 X 8 tebal 1,8 mm btg -
370 Baja Plat Hitam L = 10 lbr -
371 Baja Plat Hitam L = 8 lbr -
372 Baut Galvanis 3/4 x 2 " bh -
373 Baut Galvanis 3/4 x 2 1/2 " bh -
374 Baut Galvanis 3/4 x 3 " bh -
375 Baut Galvanis 3/4 x 3 1/2 " bh -
376 Baut Galvanis 3/4 x 4 " bh -
377 Baut Galvanis 3/4 x 4 1/2 " bh -
378 Baut Galvanis 3/4 x 5 " bh -
379 Baut Galvanis 3/4 x 5 1/2 " bh -
380 Baut Galvanis 3/4 x 6 " bh -
381 Plat Siku Panjang 30 cm bh -
382 Plat Siku Panjang 40 cm bh -
383 Plat Siku Panjang 50 cm bh -
384 Plat Siku Panjang 60 cm bh -
385 Plat Aluminium 2mm m2 -
386 Besi siku / engsel m' -
387 Besi Siku L.30.30.3 mm btg -
388 Baut UNC 5/8 x 2" bh -
389 Baut UNC 5/8 x 2 1/2" bh -
390 Baut UNC 5/8 x 3" bh -
391 Baut UNC 5/8 x 3 1/2" bh -
392 Baut UNC 5/8 x 4" bh -
393 Baut UNC 5/8 x 4 1/2" bh -
394 Baut UNC 5/8 x 5" bh -
395 Baut UNC 5/8 x 5 1/2" bh -
396 Baut UNC 5/8 x 6" bh -
397 Baut UNC 3/4 x 2" bh -
398 Baut UNC 3/4 x 2 1/2" bh -
399 Baut UNC 3/4 x 3" bh -
400 Baut UNC 3/4 x 3 1/2" bh -
401 Baut UNC 3/4 x 4" bh -
402 Baut UNC 3/4 x 4 1/2" bh -
403 Baut UNC 3/4 x 5" bh -
404 Baut UNC 3/4 x 5 1/2" bh -
405 Baut UNC 3/4 x 6" bh -
406 Baut CB 3/8 x 5" bh -
407 Baut CB 3/8 x 3" bh -
408 Baut CB 3/8 x 2" bh -
409 Behel 7/8 bh -
410 Baut Baja A325 16 x 50 bh -
411 Baut Baja A325 16 x 60 bh -
412 Baut Baja A325 16 x 70 bh -
413 Baut Baja A325 16 x 80 bh -
414 Baut Baja A325 16 x 90 bh -
415 Baut Baja A325 16 x 100 bh -
416 Baut Baja A325 16 x 110 bh -
417 Baut Baja A325 16 x 120 bh -
418 Baut Baja A325 16 x 130 bh -
419 Baut Baja A325 16 x 140 bh -
420 Baut Baja A325 16 x 150 bh -
421 Baut Baja A325 19 x 50 bh -
422 Baut Baja A325 19 x 60 bh -
423 Baut Baja A325 19 x 70 bh -
424 Baut Baja A325 19 x 80 bh -
425 Baut Baja A325 19 x 90 bh -
426 Baut Baja A325 19 x 100 bh -
427 Baut Baja A325 19 x 110 bh -
428 Baut Baja A325 19 x 120 bh -
429 Baut Baja A325 19 x 130 bh -
430 Baut Baja A325 19 x 140 bh -
431 Baut Baja A325 19 x 150 bh -
432 Baut Galvanis 3/8 x 2 " bh -
433 Baut Galvanis 3/8 x 2 1/2 " bh -
434 Baut Galvanis 3/8 x 3 " bh -
435 Baut Galvanis 3/8 x 3 1/2 " bh -
436 Baut Galvanis 3/8 x 4 " bh -
437 Baut Galvanis 3/8 x 4 1/2 " bh -
438 Baut Galvanis 3/8 x 5 " bh -
439 Baut Galvanis 3/8 x 5 1/2 " bh -
440 Baut Galvanis 3/8 x 6 " bh -
441 Baut Galvanis 5/8 x 2 " bh -
442 Baut Galvanis 5/8 x 2 1/2 " bh -
443 Baut Galvanis 5/8 x 3 " bh -
444 Baut Galvanis 5/8 x 3 1/2 " bh -
445 Baut Galvanis 5/8 x 4 " bh -
446 Baut Galvanis 5/8 x 4 1/2 " bh -
447 Baut Galvanis 5/8 x 5 " bh -
448 Baut Galvanis 5/8 x 5 1/2 " bh -
449 Baut Galvanis 5/8 x 6 " bh -
450 Besi Pipa Galvanis lonjor -
451 besi tangga D 19, enamel cat bh -
452 Handle Besi Ø 12, enamel cat bh -
453 Angker diameter 12mm bh -
454 Skruf Fixer 5 cm bh -
455 Dynabolt bh -
456 Rapidrant gln -
457 Sealant tube -
458 Silicon kg -
459 Elektrode 0,6 % bh -
460 Elektrode 2 % bh -
BESI PAGAR
461 Pagar Setara BRC T.90 diameter 6mm m' -
462 Pagar Setara BRC T.120 diameter 6mm m' -
463 Pagar Setara BRC T.150 diameter 6mm m' -
464 Pagar Setara BRC T.175 diameter 7mm m' -
465 Pagar Setara BRC T.190 diameter 7mm m' -
466 Pagar HotDip Galvanized T.90 diameter 6mm m' -
467 Pagar HotDip Galvanized T.120 diameter 6mm m' -
468 Pagar HotDip Galvanized T.150 diameter 7mm m' -
469 Pagar HotDip Galvanized T.175 diameter 7mm m' -
470 Pagar HotDip Galvanized T.190 diameter 7mm m' -

CAT
471 Cat Marka Jalan Kg -
472 Glas Bit Kg -
473 Cat besi kg -
474 Cat Menie besi Kg -
475 Cat menie Kayu kg -
476 Cat Dasar Tembok Setara Emco Kg -
477 Cat Setara weldon biasa Kg -
478 Cat Setara weldon warna Kg -
479 Cat Setara weldon warna tua Kg -
480 Cat Setara emco Lux Biasa kg -
481 Cat Setara emco Lux Warna kg -
482 Cat Setara emco Lux Warna Tua kg -
483 Cat tembok Setara Decolith kg -
484 Cat tembok Setara Dulux Exterior kg -
485 Cat tembok Setara Dulux Interior kg -
486 Cat tembok Setara Vinilex kg -
487 Cat Galvanis kg -
488 Cat Kayu Emco kg 65,000.00
489 Cat Baja Chromate (anti karat) Kg -
490 Cat Kansteen Kg -
491 Kalkarium Kg -
492 Kapur sirih Kg -
493 Amplas lbr -
494 Kuas Bh -

Cat KCA
495 Cat Natural@25 kg Pail -
496 Cat Flakes@25 kg Pail -
497 Cat Genteng @25kg Pail -

Stone Coating
498 Clear gloss air kg -
499 Black gloss air kg -
500 Clear gloss solvent kg -
501 Black gloss solvent kg -
502 Clear doft solvent kg -
503 Black doft solvent kg -
504 Dempul / Plamir ltr -
505 Dempul / Plamir Altik ltr -
506 Dempul Impra Kayu ltr -
507 Kuas untuk mengecat bh -
508 Lem Fox (Rajawali Kuning) Gln -
509 Lem Wall Paper Kg -
510 Mild zak -
511 Minyak cat ltr -
512 Melamine Lack / Imfra ltr -
513 Okear / Veap Kg -
514 Plamir kayu kg -
515 Plamir tembok setara wall Putty kg -
516 Politur ultra ltr -
517 Politur Jadi ltr -
518 vernis ltr -
519 Residu / Teer Ltr -
520 Roll Buah -
521 Sending Seaker ltr -
522 Soda Api Kg -
523 Thiner A Spesial ltr -
524 Thiner B ltr -
525 Teack Oil ltr -
526 Wall Paper Setara Silk House m2 -
527 Wood Filler ltr -
528 Cat Scotlight Ltr -
529 Mowilex Kg -

KACA
530 Bingkai Nako Silver daun -
531 Bingkai Nako Coklat daun -
532 Glass Block bh -
533 Kaca 2 mm bening m2 -
534 Kaca 3 mm bening m2 -
535 Kaca 5 mm bening m2 -
536 Kaca 6 mm bening m2 -
537 Kaca 8 mm bening m2 -
538 Kaca 10 mm bening m2 -
539 Kaca 12 mm bening m2 -
540 Kaca Cermin 3 mm m2 -
541 Kaca Cermin 5 mm m2 -
542 Kaca Es/Kapur 3 mm m2 -
543 Kaca Es/Kapur 5 mm m2 -
544 Kaca Nako Bening m2 -
545 Kaca Nako Rayben m2 -
546 Kaca ryben 3 mm m2 -
547 Kaca ryben 5 mm m2 -
548 Kaca asahi tebal 3 mm polos clear m2 -
549 Kaca asahi tebal 3 mm ryben dark grey m2 -
550 Kaca asahi tebal 3 mm cermin mirror m2 -
551 Kaca asahi tebal 3 mm es mislet m2 -
552 Kaca asahi tebal 3 mm biru dark blue m2 -
553 Kaca asahi tebal 3 mm one way m2 -
554 Kaca asahi tebal 5 mm polos clear m2 -
555 Kaca asahi tebal 5 mm ryben dark grey m2 -
556 Kaca asahi tebal 5 mm cermin mirror m2 -
557 Kaca asahi tebal 5 mm es mislet m2 -
558 Kaca asahi tebal 6 mm polos clear m2 -
559 Kaca asahi tebal 8 mm polos clear m2 -
560 Kaca asahi tebal 10 mm polos clear m2 -
561 Kaca asahi tebal 12 mm polos clear m2 -
562 Kaca tempered asahimas tebal 3mm polos clear m2 -
563 Kaca tempered asahimas tebal 3mm ryben dark grey m2 -
564 Kaca tempered asahimas tebal 3mm sanergy clear m2 -
565 Kaca tempered asahimas tebal 4mm polos clear m2 -
566 Kaca tempered asahimas tebal 4mm sanergy clear m2 -
567 Kaca tempered asahimas tebal 5mm polos clear m2 -
568 Kaca tempered asahimas tebal 5mm ryben dark grey m2 -
569 Kaca tempered asahimas tebal 5mm stopsol m2 -
570 Kaca tempered asahimas tebal 5mm warna m2 -
571 Kaca tempered asahimas tebal 5mm sanergy clear m2 -
572 Kaca tempered asahimas tebal 6mm polos clear m2 -
573 Kaca tempered asahimas tebal 6mm ryben dark grey m2 -
574 Kaca tempered asahimas tebal 6mm stopsol m2 -
575 Kaca tempered asahimas tebal 6mm warna m2 -
576 Kaca tempered asahimas tebal 6mm diamon m2 -
577 Kaca tempered asahimas tebal 6mm sanergy clear m2 -
578 Kaca tempered asahimas tebal 8mm polos clear m2 -
579 Kaca tempered asahimas tebal 8mm stopsol m2 -
580 Kaca tempered asahimas tebal 8mm warna m2 -
581 Kaca tempered asahimas tebal 8mm diamon m2 -
582 Kaca tempered asahimas tebal 8mm sanergy clear m2 -
583 Kaca tempered asahimas tebal 10mm polos clear m2 -
584 Kaca tempered asahimas tebal 10mm diamon m2 -
585 Kaca tempered asahimas tebal 12mm polos clear m2 -
586 Kaca tempered asahimas tebal 12mm diamon m2 -
587 Kaca tempered asahimas tebal 15mm polos clear m2 -
588 Kaca tempered asahimas tebal 15mm diamon m2 -
589 Kaca tempered asahimas tebal 19mm polos clear m2 -
590 Kaca tempered asahimas tebal 19mm diamon m2 -
591 Kaca tebal 3+3 mm laminet biasa m2 -
592 Kaca tebal 4+4 mm laminet biasa m2 -
593 Kaca tebal 5+5 mm laminet biasa m2 -
594 Kaca tebal 6+6 mm laminet biasa m2 -
595 Kaca tebal 8+8 mm laminet biasa m2 -
596 Kaca tebal 10+10 mm laminet biasa m2 -
597 Kaca tebal 12+12 mm laminet biasa m2 -
598 Kaca tebal 3+3 mm laminet tempered m2 -
599 Kaca tebal 4+4 mm laminet tempered m2 -
600 Kaca tebal 5+5 mm laminet tempered m2 -
601 Kaca tebal 6+6 mm laminet tempered m2 -
602 Kaca tebal 8+8 mm laminet tempered m2 -
603 Kaca tebal 10+10 mm laminet tempered m2 -
604 Kaca tebal 12+12 mm laminet tempered m2 -
605 Ongkos polin kaca tempered tebal 5mm m' -
606 Ongkos polin kaca tempered tebal 6mm m' -
607 Ongkos polin kaca tempered tebal 8mm m' -
608 Ongkos polin kaca tempered tebal 10mm m' -
609 Ongkos polin kaca tempered tebal 12mm m' -
610 Ongkos polin kaca tempered tebal 19mm m' -

PIPA
611 Pipa Galvanis 1" m' -
612 Pipa Galvanis 1,5 BSA m' -
613 Pipa Galvanis 2" m' -
614 Pipa Galvanis 3" m' -
615 Pipa Maspion AW 1/2 m' -
616 Pipa Maspion AW 3/4 m' -
617 Pipa Maspion AW 1 m' -
618 Pipa Maspion AW 1-1/2 m' -
619 Pipa Maspion AW 1-1/4 m' -
620 Pipa Maspion AW 2 m' -
621 Pipa Maspion AW 2-1/2 m' -
622 Pipa Maspion AW 3 m' -
623 Pipa Maspion AW 4 m' -
624 Pipa Maspion AW 5 m' -
625 Pipa Maspion AW 6 m' -
626 Pipa Maspion AW 8 m' -
627 Pipa Maspion AW 10 m' -
628 Pipa Maspion AW 12 m' -
629 Pipa Maspion AW 14 m' -
630 Pipa Maspion AW 16 m' -
631 Pipa Maspion C 3/4 m' -
632 Pipa Maspion C 5/8 m' -
633 Pipa Maspion C 1 m' -
634 Pipa Maspion C 1-1/2 m' -
635 Pipa Maspion C 1-1/4 m' -
636 Pipa Maspion C 2 m' -
637 Pipa Maspion C 2-1/2 m' -
638 Pipa Maspion C 3 m' -
639 Pipa Maspion C 3-1/2 m' -
640 Pipa Maspion C 4 m' -
641 Pipa Maspion D 1/2 m' -
642 Pipa Maspion D 1-1/2 m' -
643 Pipa Maspion D 1-1/4 m' -
644 Pipa Maspion D 2 m' -
645 Pipa Maspion D 2-1/2 m' -
646 Pipa Maspion D 3 m' -
647 Pipa Maspion D 4 m' -
648 Pipa Maspion D 5 m' -
649 Pipa Maspion D 6 m' -
650 Pipa Maspion D 8 m' -
651 Pipa Maspion D 10 m' -
652 Pipa Maspion D 12 m' -
653 Pipa Maspion D 14 m' -
654 Pipa Maspion D 16 m' -
655 Pipa / selang spiral sel kran m' -
656 Pipa langgeng warna abu - abu AW 1/2 m' -
657 Pipa langgeng warna abu - abu AW 3/4 m' -
658 Pipa langgeng warna abu - abu AW 1 m' -
659 Pipa langgeng warna abu - abu AW 1 1/4 m' -
660 Pipa langgeng warna abu - abu AW 1 1/2 m' -
661 Pipa langgeng warna abu - abu AW 2 m' -
662 Pipa langgeng warna abu - abu AW 2 1/2 m' -
663 Pipa langgeng warna abu - abu AW 3 m' -
664 Pipa langgeng warna abu - abu AW 4 m' -
665 Pipa langgeng warna abu - abu AW 5 m' -
666 Pipa langgeng warna abu - abu AW 6 m' -
667 Pipa langgeng warna abu - abu AW 8 m' -
668 Pipa langgeng warna abu - abu AW 10 m' -
669 Pipa langgeng warna abu - abu AW 12 m' -
670 Pipa langgeng warna abu - abu AW 16 m' -
671 Pipa langgeng warna abu - abu D 1 1/4 m' -
672 Pipa langgeng warna abu - abu D 1 1/2 m' -
673 Pipa langgeng warna abu - abu D 2 m' -
674 Pipa langgeng warna abu - abu D 2 1/2 m' -
675 Pipa langgeng warna abu - abu D 3 m' -
676 Pipa langgeng warna abu - abu D 4 m' -
677 Pipa langgeng warna abu - abu D 5 m' -
678 Pipa langgeng warna abu - abu D 6 m' -
679 Pipa langgeng warna abu - abu D 8 m' -
680 Pipa langgeng warna abu - abu D 10 m' -
681 Pipa langgeng warna abu - abu D 12 m' -
682 Pipa langgeng warna abu - abu D 14 m' -
683 Pipa langgeng warna abu - abu D 16 m' -
684 Pipa langgeng warna abu - abu D 20 m' -
685 Pipa langgeng warna abu - abu C 5/8 m' -
686 Pipa langgeng warna abu - abu C 1/2 m' -
687 Pipa langgeng warna abu - abu C 3/4 m' -
688 Pipa langgeng warna abu - abu C 1 m' -
689 Pipa langgeng warna abu - abu C 1 1/4 m' -
690 Pipa langgeng warna abu - abu C 1 1/2 m' -
691 Pipa langgeng warna abu - abu C 2 m' -
692 Pipa langgeng warna abu - abu C 2 1/2 m' -
693 Pipa langgeng warna abu - abu C 3 m' -
694 Pipa langgeng warna abu - abu C 4 m' -
695 Pipa langgeng warna abu - abu C 5 m' -
696 Pipa winlon warna abu - abu AW 1/2 m' -
697 Pipa winlon warna abu - abu AW 3/4 m' -
698 Pipa winlon warna abu - abu AW 1 m' -
699 Pipa winlon warna abu - abu AW 1 1/4 m' -
700 Pipa winlon warna abu - abu AW 1 1/2 m' -
701 Pipa winlon warna abu - abu AW 2 m' -
702 Pipa winlon warna abu - abu AW 2 1/2 m' -
703 Pipa winlon warna abu - abu AW 3 m' -
704 Pipa winlon warna abu - abu AW 4 m' -
705 Pipa winlon warna abu - abu AW 5 m' -
706 Pipa winlon warna abu - abu AW 6 m' -
707 Pipa winlon warna abu - abu AW 8 m' -
708 Pipa winlon warna abu - abu AW 10 m' -
709 Pipa winlon warna abu - abu AW 12 m' -
710 Pipa winlon warna abu - abu D 1 1/4 m' -
711 Pipa winlon warna abu - abu D 1 1/2 m' -
712 Pipa winlon warna abu - abu D 2 m' -
713 Pipa winlon warna abu - abu D 2 1/2 m' -
714 Pipa winlon warna abu - abu D 3 m' -
715 Pipa winlon warna abu - abu D 4 m' -
716 Pipa winlon warna abu - abu D 6 m' -
717 Pipa winlon warna abu - abu D 8 m' -
718 Pipa winlon warna abu - abu D 10 m' -
719 Pipa winlon warna abu - abu D 12 m' -
720 Pipa winlon warna abu - abu C 5/8 m' -
721 Pipa winlon warna abu - abu C 1/2 m' -
722 Pipa winlon warna abu - abu C 3/4 m' -
723 Pipa winlon warna abu - abu C 1 m' -
724 Pipa winlon warna abu - abu C 1 1/4 m' -
725 Pipa winlon warna abu - abu C 1 1/2 m' -
726 Pipa winlon warna abu - abu C 2 m' -
727 Pipa winlon warna abu - abu C 2 1/2 m' -
728 Pipa winlon warna abu - abu C 3 m' -
729 Pipa winlon warna abu - abu C 4 m' -
730 Pipa wavin warna putih AW 1/2 m' -
731 Pipa wavin warna putih AW 3/4 m' -
732 Pipa wavin warna putih AW 1 m' -
733 Pipa wavin warna putih AW 1 1/4 m' -
734 Pipa wavin warna putih AW 1 1/2 m' -
735 Pipa wavin warna putih AW 2 m' -
736 Pipa wavin warna putih AW 2 1/2 m' -
737 Pipa wavin warna putih AW 3 m' -
738 Pipa wavin warna putih AW 4 m' -
739 Pipa wavin warna putih AW 5 m' -
740 Pipa wavin warna putih AW 6 m' -
741 Pipa wavin warna putih AW 8 m' -
742 Pipa wavin warna putih AW 10 m' -
743 Pipa wavin warna putih AW 12 m' -
744 Pipa wavin warna putih D 1 1/4 m' -
745 Pipa wavin warna putih D 1 1/2 m' -
746 Pipa wavin warna putih D 2 m' -
747 Pipa wavin warna putih D 2 1/2 m' -
748 Pipa wavin warna putih D 3 m' -
749 Pipa wavin warna putih D 4 m' -
750 Pipa wavin warna putih D 5 m' -
751 Pipa wavin warna putih D 6 m' -
752 Pipa wavin warna putih D 8 m' -
753 Pipa wavin warna putih D 10 m' -
754 Pipa wavin warna putih D 12 m' -
755 Pipa langgeng warna putih AW 1/2 m' -
756 Pipa langgeng warna putih AW 3/4 m' -
757 Pipa langgeng warna putih AW 1 m' -
758 Pipa langgeng warna putih AW 1 1/4 m' -
759 Pipa langgeng warna putih AW 1 1/2 m' -
760 Pipa langgeng warna putih AW 2 m' -
761 Pipa langgeng warna putih AW 2 1/2 m' -
762 Pipa langgeng warna putih AW 3 m' -
763 Pipa langgeng warna putih AW 4 m' -
764 Pipa langgeng warna putih AW 5 m' -
765 Pipa langgeng warna putih AW 6 m' -
766 Pipa langgeng warna putih AW 8 m' -
767 Pipa langgeng warna putih AW 10 m' -
768 Pipa langgeng warna putih AW 12 m' -
769 Pipa langgeng warna putih AW 14 m' -
770 Pipa langgeng warna putih AW 16 m' -
771 Pipa langgeng warna putih D 1 1/4 m' -
772 Pipa langgeng warna putih D 1 1/2 m' -
773 Pipa langgeng warna putih D 2 m' -
774 Pipa langgeng warna putih D 2 1/2 m' -
775 Pipa langgeng warna putih D 3 m' -
776 Pipa langgeng warna putih D 4 m' -
777 Pipa langgeng warna putih D 5 m' -
778 Pipa langgeng warna putih D 6 m' -
779 Pipa langgeng warna putih D 8 m' -
780 Pipa langgeng warna putih D 10 m' -
781 Pipa langgeng warna putih D 12 m' -
782 Pipa langgeng warna putih D 14 m' -
783 Pipa langgeng warna putih D 16 m' -
784 Pipa langgeng warna putih D 20 m' -
785 Pipa langgeng warna putih C 5/8 m' -
786 Pipa setara warna putih C 1/2 m' -
787 Pipa langgeng warna putih C 3/4 m' -
788 Pipa langgeng warna putih C 1 m' -
789 Pipa langgeng warna putih C 1 1/4 m' -
790 Pipa langgeng warna putih C 1 1/2 m' -
791 Pipa langgeng warna putih C 2 m' -
792 Pipa langgeng warna putih C 2 1/2 m' -
793 Pipa langgeng warna putih C 3 m' -
794 Pipa langgeng warna putih C 4 m' -
795 Pipa winlon warna putih AW 1/2 m' -
796 Pipa winlon warna putih AW 3/4 m' -
797 Pipa winlon warna putih AW 1 m' -
798 Pipa winlon warna putih AW 1 1/4 m' -
799 Pipa winlon warna putih AW 1 1/2 m' -
800 Pipa winlon warna putih AW 2 m' -
801 Pipa winlon warna putih AW 2 1/2 m' -
802 Pipa winlon warna putih AW 3 m' -
803 Pipa winlon warna putih AW 4 m' -
804 Pipa winlon warna putih AW 5 m' -
805 Pipa winlon warna putih AW 6 m' -
806 Pipa winlon warna putih AW 8 m' -
807 Pipa winlon warna putih AW 10 m' -
808 Pipa winlon warna putih D 1 1/4 m' -
809 Pipa winlon warna putih D 1 1/2 m' -
810 Pipa winlon warna putih D 2 m' -
811 Pipa winlon warna putih D 2 1/2 m' -
812 Pipa winlon warna putih D 3 m' -
813 Pipa winlon warna putih D 4 m' -
814 Pipa winlon warna putih D 5 m' -
815 Pipa winlon warna putih D 6 m' -
816 Pipa winlon warna putih D 8 m' -
817 Pipa winlon warna putih D 10 m' -
818 Pipa winlon warna putih C 5/8 m' -
819 Pipa winlon warna putih C 1/2 m' -
820 Pipa winlon warna putih C 3/4 m' -
821 Pipa winlon warna putih C 1 m' -
822 Pipa winlon warna putih C 1 1/4 m' -
823 Pipa winlon warna putih C 1 1/2 m' -
824 Pipa winlon warna putih C 2 m' -
825 Pipa winlon warna putih C 2 1/2 m' -
826 Pipa winlon warna putih C 3 m' -
827 Pipa winlon warna putih C 4 m' -
828 Pipa vilano warna putih AW 1/2 m' -
829 Pipa vilano warna putih AW 3/4 m' -
830 Pipa vilano warna putih AW 1 m' -
831 Pipa vilano warna putih AW 1 1/4 m' -
832 Pipa vilano warna putih AW 3 m' -
833 Pipa vilano warna putih AW 4 m' -
834 Pipa vilano warna putih AW 5 m' -
835 Pipa vilano warna putih AW 6 m' -
836 Pipa vilano warna putih D 1 1/4 m' -
837 Pipa vilano warna putih D 1 1/2 m' -
838 Pipa vilano warna putih D 2 m' -
839 Pipa vilano warna putih D 2 1/2 m' -
840 Pipa vilano warna putih D 3 m' -
841 Pipa vilano warna putih D 4 m' -
842 Pipa vilano warna putih D 5 m' -
843 Pipa vilano warna putih D 6 m' -
844 PVC Pipe dia. 150 mm m -
845 Elbow 90̊, dia 150 mm bh -
846 Elbow 45, dia 150 mm bh -
847 Sochet dia. 150 bh -
848 shortpipe ke HI dan pipa bh -
849 saddle branch bh -
850 solvent cement kg -
851 PVC Pipe dia. 200 mm m -
852 Sochet dia. 200 bh -
853 Tee dia 200 x 150 mm bh -
854 Pipa PVC ( class D ) dia 150 mm m' -
855 Bend dia 150, 90 (DV) bh -
856 Bend dia 150, 45 (DV) bh -
857 sochet dia 150 mm (DV) bh -
858 Pipa PVC ( class D ) dia 4" dia 100 mm, length = 4 m m' -
859 Sochet dia. 100 mm bh -
860 Bend dia 100, 90 bh -
861 Bend dia 100, 45 bh -
862 Tee Y 45 ; 4" x 2" bh -
863 Tee Y 45 ; 4" x 3" bh -
864 Tee Y 45 ; 4" x 4" bh -
865 Dop PVC 4" bh -
866 Reducer 150 x 100 mm bh -
867 Pipa PVC ( class D ) dia 3" dia. 75mm, length 4 m m -
868 Large Radius Elbow dia. 75, 90o bh -
869 Bend dia 75, 45 bh -
870 Sochet dia. 75 mm bh -
871 Dop PVC 3" bh -
872 Reducer 100 x 75 mm bh -
873 Pipa PVC ( class D ) dia 2" m -
874 Sochet dia. 50 mm bh -
875 Large Radius Elbow dia. 50, 90o bh -
876 Bend dia 50, 45 bh -
877 Dop PVC 2" bh -
878 Pipa PVC (class D), Ø 2 1/2" (63 mm) SCJ m -
879 Socket dia 63 mm bh -
880 Bend dia 63, 90o bh -
881 Bend dia 63, 45o bh -
882 Dop PVC 1 1/2" bh -
883 Pipa PVC (class D), Ø 1 1/2" (40 mm) SCJ m -
884 Socket dia 40 mm bh -
885 Bend dia 40, 90o bh -
886 Bend dia 40, 45o bh -
887 Dop PVC 1 1/2" bh -
888 Pipa PVC D, Ø 1 1/4" (30 mm) SCJ m -
889 Socket dia 30 mm bh -
890 Bend dia 30, 90o bh -
891 Bend dia 30, 45o bh -
892 Dop PVC 1 1/4" bh -
893 Pipa PVC D, Ø 1" (25 mm) SCJ m -
894 Socket dia 25 mm bh -
895 Bend dia 25, 90o bh -
896 Bend dia 25, 45o bh -
897 Dop PVC 1 1/4" bh -
898 Tee Y; 3" x 3" bh -
899 Tee Y; 3" x 2" bh -
900 Tee ; 2" x 2" bh -
901 Sifon Crom Leher Angsa bh -
902 Pipa PVC Ø 6" m -
903 Pipa PVC Ø 4" m -
904 Pipa PVC Ø 3" m -
905 Pipa PVC Ø 2" m -
906 Pipa GI Ø 4" m -
907 Pipa GI Ø 3" m -
908 Pipa GI Ø 2" m -
909 PVC Tee R-R Ø 10" x 3" bh -
910 PVC Tee R-R Ø 6" x 4" bh -
911 PVC Tee R-R Ø 6" x 3" bh -
912 PVC Tee R-R Ø 4" x 4" bh -
913 PVC Tee R-R Ø 4" x 3" bh -
914 PVC Tee R-R Ø 3" x 3" bh -
915 PVC Tee R-R Ø 2" x 3" bh -
916 PVC Tee R-SC Ø 4" x 2" bh -
917 PVC Tee R-SC Ø 3" x 2" bh -
918 PVC Tee SC-SC Ø 2" x 2" bh -
919 CI Giboult Joint Std Jis Ø 10" bh -
920 CI Giboult Joint Std SII Ø 6" bh -
921 CI Giboult Joint Std SII Ø 4" bh -
922 CI Giboult Joint Std SII Ø 3" bh -
923 CI Gate Valve FL- FL Ø 4" bh -
924 CI Plat Cap Ø 4" bh -
925 PVC Tapper Core Ø 4" bh -
926 PVC Tapper Core Ø 3" bh -
927 BS Bend FL- FL Ø 4" x 45 ̊ bh -
928 BS Bend FL- FL Ø 3" x 45 ̊ bh -
929 BS Flenge Ø 4" bh -
930 BS Flange Ø 3" bh -
931 Karet Packing Ø 4" bh -
932 Karet Packing Ø 3" bh -
933 Bronze Gate Valve Ø 3" bh -
934 Bronze Gate Valve Ø 2" bh -
935 PVC Valve Sochet Ø 3" bh -
936 PVC Valve Sochet Ø 2" bh -
937 GI Cap Ø 3" bh -
938 GI Cap Ø 2" bh -
939 GI Elbow Ø 2" bh -
940 PVC Bend R- R Ø 4" x 90 ̊ bh -
941 PVC Bend R- R Ø 4" x 45 ̊ bh -
942 PVC Bend R- R Ø 3" x 45 ̊ bh -
943 PVC Bend R- R Ø 3" x 90 ̊ bh -
944 PVC Elbow Ø 2" bh -
945 PVC Reducer R-R Ø 4" x 3" bh -
946 PVC Reducer R-R Ø 3" x 2" bh -
947 Beton Path box bh -
948 Beton KS bh -
949 Pipa Selubung Valve M -
950 Penutup Pipa bh -
951 Patok UP bh -
952 Beton Penahan Ø 10" bh -
953 Beton Penahan Ø 6" bh -
954 Beton Penahan Ø 4" bh -
955 Beton Penahan Ø 3" bh -
956 Beton Penahan Ø 2" bh -
957 Baut Dynabol bh -

BAHAN LISTRIK
958 Coaxial cable 5C - 75 ohm commscof m -
959 Box Panel (3 mm) (400 x 600) Bh -
960 Figting lampu Broco Bh -
961 Inbow dos plastik clipsal E 157 P OB bj 8,000.00
962 Kabel NYM 2 x 1.5 mm Suprime NYM m -
963 Kabel NYY 2 x 1.5 mm m -
964 Kabel NYM 2 x 2.5 mm m -
965 Kabel NYY 3 x 1.5 mm m -
966 Kabel NYM 3 x 2.5 mm m 15,500.00
967 Kabel NYY 3 x 2.5 mm m -
968 Kabel NYM 4 mm m -
969 Kabel NYY 2 x 2,5 mm m -
970 Kabel Twisteed 2 x 16 mm m -
971 Kabel telephone m -
972 Klem clipsal 20 mm bj 3,000.00
973 Casing Lampu Bawah Air bh -
974 Casing Lampu Tangga bh -
975 Kap Lampu 14 Inchi Aluminium bh -
976 Fitting Gantung E27 bh -
977 Lampu Son 150 Watt Setara Philips Set -
978 Lampu Mercury (halaman) bh -
979 Lampu Mercury 125 Watt Setara Philips Set -
980 Lampu Mercury 250 Watt Setara Philips Set -
981 Lampu Mercury 400 Watt Setara Philips Set -
982 Lampu pijar 10 Watt Setara Philips bh -
983 Lampu pijar 15 Watt Setara Philips bh -
984 Lampu pijar 25 Watt Setara Philips bh -
985 Lampu pijar 40 Watt Setara Philips bh -
986 Lampu TL 20 Watt Komplit (Ballast Philips) bh -
987 Lampu TL 25 Watt Komplit (Ballast Philips) bh -
988 Lampu LED (5 Watt) Setara Philips bh -
989 Lampu LED (7 Watt) Setara Philips bh -
990 Lampu LED (10) Setara Philips bh -
991 Lampu LED (13 Watt) Setara Philips bh -
992 Lampu Sorot LED (5 Watt) Setara Philips bh -
993 Lampu Sorot LED (7 Watt) Setara Philips bh -
994 Lampu Sorot LED (10 Watt) Setara Philips bh -
995 Lampu Sorot LED (13 Watt) Setara Philips bh -
996 Lampu Sorot LED (25 Watt) Setara Philips bh -
997 Lampu Sorot LED (100 Watt) Setara Philips (ip65) bh -
998 Lampu Sorot Cahaya RGB (LED) 100 watt setara Philips (ip65) bh -
999 Lampu Sorot Bawah Cahaya Warm White (bolam) 400 watt setara Philips bh -
1000 Lampu Sorot Bawah Cahaya Warm White (LED) 10 watt setara Philips (ip65) bh -
1001 Lampu Sorot Bawah Cahaya Warm White (LED) 30 watt setara Philips (ip65) bh -
1002 Lampu Esensial (5 Watt) Setara Philips bh -
1003 Lampu Esensial (8 Watt) Setara Philips bh -
1004 Lampu Esensial (11 Watt) Setara Philips bh -
1005 Lampu Esensial (14 Watt) Setara Philips bh -
1006 Lampu Esensial (18 Watt) Setara Philips Bh -
1007 Scot Light m2 -
1008 Magnet Contactor 80 A SN - 50 bh -
1009 MCB 3 phase 40 A MG bh -
1010 MCB 3 phase 63 A MG bh -
1011 Panel MDP Unit -
1012 Panel SDP Unit -
1013 Pipa clipsal 20 mm bt 12,000.00
1014 Pipa flexible clipsal 20 mm m1 -
1015 Saklar ganda Setara Broco bh -
1016 Saklar tunggal Setara Broco bh -
1017 SL 18 Watt Komplit bh -
1018 Sock clipsal 20 mm bj 3,000.00
1019 Steker bh -
1020 Stop Kontak bh -
1021 Stop Kontak Khusus (Kedap Air) bh -
1022 Travo max 50 watt bh -
1023 Tee dos clipsal 20 mm bh 8,000.00
1024 Time Switch bh -
1025 T Foring bh -

MARMER / GRANIT
1026 Marmer (30 x 30) m2 -
1027 Marmer (40 x 40) m2 -
1028 Granit (30 x 30) Tekstur Kasar Tebal 3 cm m2 -
1029 Batu Andesit (30 x 30 x 5 cm) m2 -
1030 Roster Keramik (12 x 11 x 24) bh -

GRANIT TILE
1031 Essenza 40 x 40 m2 -
1032 Essenza 60 x 60 m2 -
1033 Granito 40 x 40 cm m2 -
1034 Nero Granito 30 x 60 cm m2 -
1035 Nero Granito 40 x 40 cm m2 -
1036 Nero Granito 60 x 60 cm m2 -
1037 Setara Ex Cina 60 x 60 cm m2 -
1038 Setara Ex Cina 80 x 80 cm m2 -

KERAMIK
1039 Keramik Asia Tile 20 x 20 kelas I warna muda m2 -
1040 Keramik Setara Asia Tile 20 x 20 kelas I warna tua m2 -
1041 Keramik Setara Asia Tile 20 x 25 kelas I m2 -
1042 Keramik Setara Asia Tile 30 x 30 kelas I warna muda m2 -
1043 Keramik Setara Asia Tile 30 x 30 kelas I warna tua m2 -
1044 Keramik Setara Asia Tile 40 x 40 kelas I m2 -
1045 Keramik Setara Asia Tile 60 x 60 kelas I Setara Platinum m2 -
1046 Keramik Setara ARWANA ( warna putih) m2 -
1047 Keramik Setara ARWANA ( warna tua) m2 -
1048 Keramik Setara Diamond 10/20 cm (Warna Muda) m2 -
1049 Keramik Setara Diamond 20/20 cm (Kelas I Warna Muda) m2 -
1050 Keramik Setara Diamond 30/30 cm (Kelas I Warna Muda) m2 -
1051 Keramik Setara Diamond 10/20 cm (Warna tua) m2 -
1052 Keramik Setara Diamond 20/20 cm (Kelas I Warna Tua) m2 -
1053 Keramik Setara Diamond 30/30 cm (Kelas I Warna Tua) m2 -
1054 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna muda) m2 -
1055 Keramik Setara Ikad (Keramik) Kw. I 10 x 20 cm (DK warna tua) m2 -
1056 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna tua) m2 -
1057 Keramik Setara Ikad (Keramik) Kw. I 20 x 20 cm (warna muda) m2 -
1058 Keramik Setara Ikad (Keramik) Kw. I 30 x 30 cm m2 -
1059 Keramik Setara Ikad (Keramik) Kw. I 40 x 40 cm m2 -
1060 Keramik Setara Ikad (Keramik) Kw. I 50 x 50 cm m2 -
1061 Keramik Setara KIA 20/20 cm warna muda m2 -
1062 Keramik Setara KIA 30/30 cm warna muda m2 -
1063 Keramik Setara KIA 20/20 cm warna tua m2 -
1064 Keramik Setara KIA 30/30 cm warna tua m2 -
1065 Keramik Setara Mulia Warna Putih m2 -
1066 Keramik Setara Mulia Warna Tua m2 -
1067 Keramik Setara Mulia 20 x 20 cm Warna Tua m2 -
1068 Keramik Setara Mulia 20 x 20 cm Warna Muda m2 -
1069 Keramik Setara Mulia 30 x 30 cm Warna Putih m2 -
1070 Keramik Setara Mulia 30 x 30 Warna Marbel m2 -
1071 Keramik Setara Mulia 30 x 30 Warna Impresso m2 -
1072 Keramik Setara Mulia 40 x 40 cm kelas I m2 -
1073 Keramik Setara ROMAN 20/20 cm m2 -
1074 Keramik Setara ROMAN 30/30 cm m2 -
1075 Tegel PC abu - abu 20/20 cm m2 -
1076 Tegel PC Warna 20/20 cm m2 -
1077 Tegel PC Warna 30/30 cm m2 -
1078 Tegel 30 x 30 TB PC m2 -
1079 Tegel 30 x 30 TB PC Kuning m2 -
1080 Tegel 30 x 30 Warna Merah m2 -
1081 Tegel Bata 20 x 20 Merah m2 -
1082 Tegel Bata 20 x 20 PC m2 -
1083 Tegel B/TB 20 x 20 Kuning m2 -
1084 Tegel Mozaik Porselint 30/30 cm m2 -
1085 Tegel Wafel 20/20 cm Warna m2 -
1086 Ubin PC Warna bh -
1087 Ubin PC Warna 20 / 20 Cm m2 -
1088 Batu Lahar 30/30 bh -
1089 Porselint 11/11 cm bh -
1090 Porselen m2 -

ATAP
1091 Alang-alang panjang 2,4 meter lbr -
1092 Alluminium foil M2 Double rol -
1093 Akustik 60 cm x 120 cm lbr -
1094 Asbes Bubungan lbr -
1095 Asbes Gelombang 1,80 m x 0,80 m lbr -
1096 Asbes Gelombang 1,80 m x 1,05 m lbr -
1097 Asbes Gelombang 2,10 m x 1,05 m lbr -
1098 Asbes Gelombang 2,4 m x 1,05 m lbr -
1099 Asbes Rata 2 m x 1 m x 4 mm lbr -
1100 Bentala tanah liat Ex Pejaten bh -
1101 Bentala Ex Kapal bh -
1102 Bentala Besar polos Lubang 24 cm bh -
1103 Bentala Besar Warna Lubang 25 cm bh -
1104 Bentala Besar polos Lubang 90 cm bh -
1105 Bentala Besar Warna Lubang 90 cm bh -
1106 Bubungan Besar bh -
1107 Bubungan Kecil bh 7,000.00
1108 Bubungan Bambe Kecil bh -
1109 Bubungan Bulat Karang Pilang bh -
1110 Bubungan Bulat Jati Wangi bh -
1111 Bubungan Bulat Ngalayur isi 3,5/m bh -
1112 Bubungan Besar Good Year bh -
1113 Bubungan Beton Cisangkan bh -
1114 Bubungan Gerard lbr -
1115 Bubungan Karang Pilang isi 3,5/m bh -
1116 Bubungan Pletong Jatiwangi bh -
1117 Bubungan SL Utama bh -
1118 Bubungan SL Ngalayur bh -
1119 Bubungan Segi Tiga Karang Pilang bh -
1120 Bubungan Utama isi 3,5/m bh -
1121 Genteng Bambe bh -
1122 Genteng Bambe Karang Pilang bh -
1123 Genteng Bambe Kecil bh -
1124 Genteng Beton Cisangkan bh -
1125 Genteng Gemini bh -
1126 Genteng Gerard Polos m2 -
1127 Genteng Good Year m2 -
1128 Genteng Kanmuri (glazur) isi 14/m2 bh -
1129 Genteng Kodok Lokal bh -
1130 Genteng Kodok Kamulan bh -
1131 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bh -
1132 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bh -
1133 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bh -
1134 Genteng Kodok Karang Pilang (Surabaya) bh -
1135 Genteng Kodok Soka bh -
1136 Genteng Lestari bh -
1137 Genteng Metal m2 -
1138 Genteng Metal 80 x 77,6 (Polos) lbr -
1139 Genteng Metal 80 x 77,6 (Pasir) lbr -
1140 Genteng Morando Abadi isi 18/m2 bh -
1141 Genteng Morando Jatiwangi isi 18/m2 bh -
1142 Genteng Morando Ngalayur isi 20/m2 bh -
1143 Genteng Morando Metal bh -
1144 Genteng Pejaten Mini bh -
1145 Genteng Plentong bh 3,100.00
1146 Genteng plentong dicat bh -
1147 Genteng Plentong Mantili bh -
1148 Genteng Plentong Pejaten / Darmasaba bh -
1149 Genteng Plentong Jatiwangi / Surabaya bh -
1150 Genteng Portugis bh -
1151 Genteng Pres Besar bh -
1152 Genteng Pres Besar Cat bh -
1153 Genteng Pres Mini bh -
1154 Genteng Pres Mini Cat bh -
1155 Genteng Terreal bh -
1156 Genteng T. Romana bh -
1157 Genteng Besar polos Lubang 35 cm bh -
1158 Genteng Besar Warna Lubang 35 cm bh -
1159 Fiberglas (1.80 x 0.80) M2 lbr -
1160 Ijuk kg -
1161 Ijuk Bersih bh -
1162 Ijuk Lampung bh -
1163 Ikut Celedu bh -
1164 Ikut Celedu Besar Polos bh -
1165 Ikut Celedu Besar Warna bh -
1166 Ikut Celedu Kecil Polos bh 93,000.00
1167 Ikut Celedu Kecil Warna bh -
1168 Kawat las kg -
1169 Kawat Diameter 4 mm kg -
1170 Murda / Puntal Paras bh -
1171 Murda tanah liat Ex Pejaten bh -
1172 Murda Kecil Polos Lubang 25 cm bh -
1173 Murda Kecil Warna Lubang 25 cm bh -
1174 Profil Aluminium "T" m3 -
1175 Seng BJLS 0,18 gelombang lbr -
1176 Seng BJLS 0,22 gelombang lbr -
1177 Seng BJLS 0,30 gelombang lbr -
1178 Seng Zincalume Panjang 6m Tebal 0,5 mm lbr -
1179 Seng Plat Lebar 0,90 M lbr -
1180 Seng Plat 3" x 6" BJLS 28 lbr -
1181 Seng Plat Aluminium lbr -
1182 Sirap lbr -
1183 Subeng Besar Polos lbr -
1184 Subeng Besar Warna lbr -
1185 Subeng Kecil Polos lbr -
1186 Subeng Kecil Warna bh -
TALI
1187 Tali Ijuk kg -
1188 Tali pengikat ikat -
1189 Tali pengikat alang-alang ikat -
1190 Tali Rafia Gulung -

SANITAIR
1191 Bak mandi fibre glass 70x70x66 cm bh -
1192 Bak mandi porselin/ keramik bh -
1193 Bak mandi keramik 50x50 bh -
1194 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh -
1195 Floor Drain Plastic bh -
1196 Floor Drain Stainless bh -
1197 Floor drain plastik Setara Alianco bh -
1198 Floor drain stainless Setara Wasser bh -
1199 Dudukan Kloset dan Perlengkapannya bh -
1200 Kloset duduk INA Komplit bh -
1201 closet duduk INA (putih) STD bh -
1202 closet duduk INA (warna) bh -
1203 Kloset duduk Amerika Standar Winplus bh -
1204 closet duduk TOTO (putih) STD bh -
1205 closet duduk TOTO (warna) bh -
1206 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh -
1207 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh -
1208 Kloset duduk " TOTO Type AVANTE CW 823 J bh -
1209 Kloset duduk " TOTO Type CW 660J bh -
1210 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh -
1211 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh -
1212 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh -
1213 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh -
1214 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh -
1215 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh -
1216 Kloset jongkok " TOTO Type CE 6 COMPLIT bh -
1217 Kloset jongkok " TOTO Type CE 7 COMPLIT bh -
1218 closet jongkok porselin/ keramik bh -
1219 Kloset porselin jongkok TOTO (standar) bh -
1220 Kloset porselin jongkok Ina (standar) bh -
1221 Kran biasa Setara Onda bh -
1222 Kran SunEi PI/3 JHR bh -
1223 Kran TOTO T 205 LCSC bh -
1224 Kran TOTO T 205 MC bh -
1225 Kran TOTO T 23 B13 bh -
1226 Kran TOTO T 23 B13V7NB bh -
1227 Kran TOTO T 26 - 13 bh -
1228 Kran TOTO TX 109 LH bh -
1229 Penyekat Urinoir " TOTO " Type A 100 " bh -
1230 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh -
1231 Soap holder " TOTO " Type S 6 N " bh -
1232 Seal tape bh -
1233 Urinoir TOTO (STD) bh -
1234 Urinoir " TOTO U 57 M bh -
1235 Urinoir " TOTO U 57 M BODI bh -
1236 Urinoir INA (STD) bh -
1237 Wastagel KIA Standard bh -
1238 Wastagel KIA Warna bh -
1239 Wastafel TOTO (putih) bh -
1240 Wastafel TOTO (warna) bh -
1241 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh -
1242 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh -
1243 Wastafel INA (putih) bh -
1244 Wastafel INA (warna) bh -
KUNCI DAN PENGGANTUNG
1245 Engsel H ( 80 x 50) Ps -
1246 Engsel kupu-kupu Rafes 4' 304 ps -
1247 Engsel pintu Setara ECOLING Ps 52,000.00
1248 Engsel jendela Setara ECOLING Ps 45,000.00
1249 Engsel jendela Setara CAMEL Ps -
1250 Espagnoleth Setara Rafes 60 cm Ps -
1251 Grendel Setara ESBELA bh -
1252 Grendel tanam Setara CAMEL bh -
1253 Kait angin biasa Setara CAMEL bh 35,000.00
1254 Kait angin diameter 10 mm bh -
1255 Kait angin lipat Setara ESBELA bh -
1256 Kait angin tarik Setara ESBELA bh -
1257 Kunci kuda 2 x putar bh -
1258 Kunci lif 1 x putar Setara BELLEZA bh -
1259 Kunci lif 2 x putar bh -
1260 Kunci pintu TOP Setara ESBELA bh -
1261 Kunci pintu Vanesa Setara CAMEL bh -
1262 Kunci pintu Setara ESBELLA bh -
1263 Kunci Pintu 2 x putar Setara SES bh -
1264 Kunci pintu Setara DELWIN) bh -
1265 Kunci shang hae 2 x putar bh -
1266 Kunci slot / Grendel Pintu Setara DELLWYN bh -
1267 Kunci tanam 2 slag Setara Dexon bh 246,000.00
1268 Kunci silinder bh -
1269 Door holder bh -
1270 Rel pintu sorong m' -
1271 Rolling door plaat m2 -
1272 Rolling Door Aluminium m2 -
1273 Besi Tangga D 19, Enamel Cat bh -
1274 Handle Besi Ø 12, Enamel Cat bh -

PAKU
1273 Paku Beton kg 58,000.00
1274 Paku Usuk kg 15,000.00
1275 Paku Reng kg 15,000.00
1276 Paku List kg 22,000.00
1277 Paku Seng Ulir bh 2,500.00
1278 Paku 2-4 cm kg 18,000.00
1279 Paku Pancing 60 x 230 kg 25,000.00
1280 Paku 5-12 cm kg 18,000.00
1281 Paku 2 cm (30 kg) 3/4 inch SQ dus 450,000.00
1282 Paku 2,5 cm (30 kg) 1 inch SQ dus -
1283 Paku 3 cm (30 kg) 1 1/4 inch SQ dus -
1284 Paku 4 cm (30 kg) 1 1/2 inch SQ dus -
1285 Paku 5 cm (30 kg) 2 inch SQ dus -
1286 Paku 7,10,12 cm (3,4,5) inch SQ dus -
1287 Paku 5 -12 cm (27kg) 2,3,4,5 inch dus -
1288 Paku skrup 1/2" kg 49,000.00
1289 Paku skrup 2" kg -
1290 Paku skrup 3.5" kg -
1291 Bendrat 20 kg rol -
1292 Sekrup Kalisiboard buah 550.00

BETON CETAK
1293 Paving Arahan 30 x 30 tebal 6 cm (K225) m2 -
1294 Paving Arahan 20 x 20 tebal 6 cm (K225) m2 -
1295 Paving 10 x 20 cm tebal 6 cm K225 (Polos) m2 -
1296 Paving 10 x 20 cm tebal 6 cm K225 (Warna) m2 -
1297 Paving 20 x 20 cm tebal 6 cm K225 (Polos) m2 -
1298 Paving 20 x 20 cm tebal 6 cm K225 (Warna) m2 -
1299 Paving 10 x 20 cm tebal 6 cm K350 (Polos) m2 -
1300 Paving 10 x 20 cm tebal 6 cm K350 (Warna) m2 -
1301 Paving 20 x 20 cm tebal 6 cm K350 (Polos) m2 -
1302 Paving 20 x 20 cm tebal 6 cm K350 (Warna) m2 -
1303 Paving 10 x 20 cm tebal 8 cm K225 (Polos) m2 -
1304 Paving 10 x 20 cm tebal 8 cm K225 (Warna) m2 -
1305 Paving 20 x 20 cm tebal 8 cm K225 (Polos) m2 -
1306 Paving 20 x 20 cm tebal 8 cm K225 (Warna) m2 -
1307 Paving 10 x 20 cm tebal 8 cm K350 (Polos) m2 -
1308 Paving 10 x 20 cm tebal 8 cm K350 (Warna) m2 -
1309 Paving 20 x 20 cm tebal 8 cm K350 (Polos) m2 -
1310 Paving 20 x 20 cm tebal 8 cm K350 (Warna) m2 -
1311 Paving 20 x 20 cm tebal 8 cm K400 (Polos) m2 -
1312 Paving 20 x 20 cm tebal 8 cm K400 (Warna) m2 -
1313 Paving Tiga Berlian tebal 6 Cm K225 (Polos) m2 -
1314 Paving Tiga Berlian tebal 6 cm K225 (Warna) m2 -
1315 Paving segi enam xexagon 6 cm K225 pc m2 -
1316 Paving segi enam xexagon 6 cm K225 merah m2 -
1317 Paving segi enam xexagon 6 cm K225 hitam m2 -
1318 Paving segi enam xexagon 6 cm K300 pc m2 -
1319 Paving segi enam xexagon 6 cm K300 merah m2 -
1320 Paving segi enam xexagon 6 cm K300 hitam m2 -
1321 Paving segi enam xexagon 6 cm K350 pc m2 -
1322 Paving segi enam xexagon 6 cm K350 merah m2 -
1323 Paving segi enam xexagon 6 cm K350 hitam m2 -
1324 Paving segi enam xexagon 6 cm K400 pc m2 -
1325 Paving segi enam xexagon 6 cm K400 merah m2 -
1326 Paving segi enam xexagon 6 cm K400 hitam m2 -
1327 Paving bujur sangkar tanpa tias 6 cm K225 pc m2 -
1328 Paving bujur sangkar tanpa tias 6 cm K225 merah m2 -
1329 Paving bujur sangkar tanpa tias 6 cm K225 hitam m2 -
1330 Paving bujur sangkar tanpa tias 8 cm K225 pc m2 -
1331 Paving bujur sangkar tanpa tias 8 cm K225 merah m2 -
1332 Paving bujur sangkar tanpa tias 8 cm K225 hitam m2 -
1333 Box Culvert Type 600x600x1200 K 350 bh -
1334 Box Culvert Type 800x800x1200 K 350 bh -
1335 Box Culvert Type 1000x1000X1200 K 350 bh -
1336 Box Culvert Type 1200x1200X1200 K 350 bh -
1337 Box Culvert Type 1500x1500x1200 K 350 bh -
1338 Box Culvert Type 2000x2000x1200 K 350 bh -
1339 Box Culvert Type 3000x2000x1200 K 350 bh -
1340 Box Culvert Type 3000x2500x1200 K 350 bh -
1341 Box Culvert Type 3000x3000x1200 K 350 bh -
1342 Saluran Berbentuk U Type 300x300x1200 K350 bh -
1343 Saluran Berbentuk U Type 300x400x1200 K350 bh -
1344 Saluran Berbentuk U Type 300x500x1200 K350 bh -
1345 Saluran Berbentuk U Type 400x400x1200 K350 bh -
1346 Saluran Berbentuk U Type 400x600x1200 K350 bh -
1347 Saluran Berbentuk U Type 400x700x1200 K350 bh -
1348 Saluran Berbentuk U Type 500x500x1200 K350 bh -
1349 Saluran Berbentuk U Type 500x600x1200 K350 bh -
1350 Saluran Berbentuk U Type 500x700x1200 K350 bh -
1351 Saluran Berbentuk U Type 600x600x1200 K350 bh -
1352 Saluran Berbentuk U Type 600x700x1200 K350 bh -
1353 Saluran Berbentuk U Type 700x700x1200 K350 bh -
1354 Saluran Berbentuk U Type 600x800x1200 K350 bh -
1355 Saluran Berbentuk U Type 800x800x1200 K350 bh -
1356 Saluran Berbentuk U Type 800x1000x1200 K350 bh -
1357 Saluran Berbentuk U Type 1000x1000x1200 K350 bh -
1358 Bentala Exs Kapal (Paras) bh -
1359 Bentala Exs Kapal (Terakota) bh -
1360 Kanstein Segi Lima P40 bh -
1361 Kanstein Segi Lima P50 bh -
1362 Kanstein 40x28x15/12 cm bh -
1363 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) m' -
1364 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) bh -
1365 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) m' -
1366 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) bh -
1367 Kansteen K.250 bh -
1368 Kansteen Pendek K.250 bh -
1369 Kansteen Jalan Masuk K.250 bh -
1370 Kansteen Jalan Masuk 15x40x50 K.300 bh -
1371 Kansteen Segilima P.50, T.20, L.15 K.250 bh -
1372 Kansteen Bulat P.50, T.30, LA.10 LB.15 K.250 bh -
1373 Kanstein Jumbo (P:50,L:15,T:30 cm K225) m' -
1374 Kansteen Jumbo P.50, T.30, L.15 K.250 bh -
1375 Kansteen Jumbo 15x30x50 K.300 bh -
1376 Kansteen Jumbo Mini 15x20x50 K.300 bh -
1377 Kansteen Persegi T 15, P50, L 20 K 225 bh -
1378 Kasnteen Kursi K225 bh -
1379 Kansteen Kursi T 15, L 40, P 50 K 225 bh -
1380 Kansteen Kursi T 10, L 40, P 50 K 225 bh -
1381 Kansteen Jumbo 15 x 30 x 50 K.300 bh -
1382 Kansteen Jumbo Mini 15 x 20 x 50 K.300 bh -
1383 Kansteen Kursi (Jalan Masuk) 15 x 40 x 60 K.300 bh -
1384 Kansteen kotak (P:50,t.20,La.10,Lb.16cm) K225 m' -
1385 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) m' -
1386 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) m' -
1387 Tutup Got (Grill) (P:45, L:24, T:9 cm) bh -
1388 Tutup Got (Grill) (P:30, L:24, T:9 cm) bh -
1389 Plat Penutup 600 x 1200 bh -
1390 Plat Penutup 800 x 1200 bh -
1391 Plat Penutup 1000 x 1200 bh -
1392 Frame Manhole 600x600 bh -
1393 Frame Manhole 800x800 bh -
1394 Frame Manhole 1000x1000 bh -
1395 Cover manhole 600x600 bh -
1396 Cover manhole 800x800 bh -
1397 Cover manhole 1000x1000 bh -
1398 Grass Block 36 X 54 cm tebal 9 cm K 225 m2 -
1399 Grass Block lobang 5, 30 X 30 cm tebal 7 cm K 225 m2 -
1400 Beton Cetak Greas Blok K.250 bh -
1401 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) bh 47,500.00
1402 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) bh 52,500.00

PLAFOND & TIRPLEK


1401 Acustik 30/30 lbr -
1402 Celling teak (0,62 x 2,40) m2 lbr -
1403 Eternit lbr -
1404 Playwood 3 mm lbr 75,000.00
1405 Playwood 4 mm Setara Meranti lbr 180,000.00
1406 Plywood 5 mm lbr 189,000.00
1407 Playwood 9 mm Setara Meranti lbr 210,000.00
1408 Playwood aluminium lbr -
1409 Gypsum Board (120x240x9) lbr 79,200.00
1410 Kalsiboard (4,5 x 1220 x 2420) mm lbr -
1411 Tea Block 18 mm lbr -
1412 Hard board MDF lbr -
1413 Multiplek 6 mm lbr -
1414 Multiplek 9mm lbr -
1415 Multiplek 12 mm lbr -
1416 Triplek tebal 3mm (2,7mm) kayu sengon lbr -
1417 Triplek tebal 3mm (2,7mm) kayu semi meranti lbr -
1418 Triplek tebal 4mm (3,6mm) kayu sengon lbr -
1419 Triplek tebal 4mm (3,6mm) kayu semi meranti lbr -
1420 Triplek tebal 6mm (5,2mm) kayu sengon I lbr -
1421 Triplek tebal 6mm (5,2mm) kayu sengon II lbr -
1422 Triplek tebal 6mm (5,2mm) kayu semi meranti lbr -
1423 Triplek tebal 6mm (5,2mm) kayu semi meranti II lbr -
1424 Triplek tebal 8,0mm kayu sengon I lbr -
1425 Triplek tebal 8,0mm kayu sengon II lbr -
1426 Triplek tebal 8,0mm kayu semi meranti lbr -
1427 Triplek tebal 9,0mm kayu semi meranti II lbr 112,500.00
1428 Triplek tebal 12 mm kayu sengon I lbr -
1429 Triplek tebal 12 mm kayu semi meranti lbr -
1430 Triplek tebal 15 mm kayu semi meranti lbr -
1431 Triplek tebal 18 mm kayu semi meranti lbr -
1432 Teakwood 122 x 244 x 2,7 mm lbr -
1433 Melamine Putih/Biru 2,7 lbr -
1434 Triplek aluminium jruk asli lbr -
1435 Triplek aluminium jruk standar lbr -
1436 Block board 18 mm sengon lbr -
1437 Block board 18 mm meranti super lbr -
1438 Teak block 18mm lbr -
1439 Rangka Aluminium m 38,500.00
1440 Rangka Metal Furing (2 x 4 cm) panjang 4 m btg -
1441 Rangka Metal Furing (4 x 4 cm) panjang 4 m btg -
1442 Teak wood (1,20x2,40x 0,4) lbr -
1443 Teak wood (0,90x2,00 x 0,4) lbr -
1444 Jabar Wood 4 mm lbr -

BUIS BETON
1445 Buis beton Diameter 25 x 75 bh -
1446 Buis beton Diameter 30 x 75 bh -
1447 Buis beton Diameter 50 x 75 bh -
1448 Buis Beton diameter 80 cm bj -
1449 Buis Beton diameter 25 cm bj -
1450 Buis Beton diameter 50 cm bj -
1451 Buis Beton diameter 100 cm bj -

BETON READY MIX


1452 Beton Ready Mix K-175 TM Kap 7 m3 m3 -
1453 Beton Ready Mix K-225 TM Kap 7 m3 m3 -
1454 Beton Ready Mix K-250 TM Kap 7 m3 m3 -
1455 Beton Ready Mix K-275 TM Kap 7 m3 m3 -
1456 Beton Ready Mix K-300 TM Kap 7 m3 m3 -
1457 Beton Ready Mix K-350 TM Kap 7 m3 m3 -
1458 Sewa Concrete pump/M3 ls -
1459 Formite/penjaga jarak bekisting/spacer bh -

TALANG
1460 Talang Karet L = 0.50 m' -
1461 Talang Karet L = 0.90 m' -
1462 Pipa Talang PVC Setara Maspion 6" Setengah Lingkaran m' -
1463 Pipa Talang PVC Setara Maspion 6" Kotak m' -

ASPAL, BBM DAN PELUMAS


1464 Aspal Penetrasi 60/70 kg -
1465 Aspal Curah kg -
1466 Aspal RC kg -
1467 Aspal Emulsi ltr -
1468 Aspal Emulsi CRS 1 ltr -
1469 Aspal Emulsi CRS 1 Modif ltr -
1470 Aspal Emulsi CRS 2 ltr -
1471 Aspal Emulsi CSS 1 h Modif ltr -
1472 Aspal Emulsi CSS 1 h ltr -
1473 Aspal Emulsi CSS 1 / PCE ltr -
1474 Minyak Aspal ( fluck oil ) ltr -
1475 Minyak Tanah ltr -
1476 Minyak Tanah Industri ltr -
1477 Solar ltr -
1478 Solar Industri ltr -
1479 Premium ltr -
1480 Premium (industri) ltr -
1481 Pelumas ( olie ) ltr -
1482 Kayu Api m3 -
1483 Gas elpiji kg -
1484 Minyak Begesting ( B 115 ) ltr -
1485 Aspal Cold Mix (Readymix) kg -

ALAT PEMADAM KEBAKARAN


1486 Instalasi pipa induk BS 3" Sch M' -
1487 Intalasi pipa distribusi BS 2" Sch M' -
1488 Seamesi conection Bh -
1489 Box hidran dengan kelengkapannya bh -
1490 Selang pemadam 30 m bh -
1491 Pemadam api ringan 6 kg bh -

TANAMAN
1492 Pohon Lianglio / Salix Babylonica pohon -
1493 Palem Ekor Tupai / Wodyetia Bifurcata pohon -
1494 Pohon Hias pohon -
1495 Pohon Jepun / Plumeria Rubra pohon -
1496 Pohon Pudak / Pandanus Tectorius pohon -
1497 Pohon Ketapag Kencana / Terminalia Molineti pohon -
1498 Pohon Sente Batang Hitam / Alokasia 'black' pohon -
1499 Pohon Dadap Merah / Erythrina Crista Galli pohon -
1500 Pohon Jepun Pagoda / Plumeria 'pagoda' pohon -
1501 Pohon Tabebuya / Chrysotricha sp pohon -
1502 Rumput (Sekelas rumput mutiara) m2 -
1503 Semak Jempiring / Gardenia Jasminioides polybag -
1504 Semak Spathyphilum / Spathyphylum sp polybag -
1505 Semak Reulia Besar / Reulia Malacosperma Giant polybag -
1506 Semak Anturium Bunga / Anthurium Andreanum polybag -
1507 Semak Hemigrapis / Hemigrapis sp polybag -
1508 Semak Puring / Codeaium variegatum polybag -
1509 Semak Pakis Bulu / Nephrolepis biserrata polybag -
1510 Tanaman rumput mutiara/jepang m2 -
1511 Tanaman perdu m2 -
1512 Lili Bangkok / Hymenocalis litoralis polybag -
1513 Jempiring / Gardenia jasminioides polybag -
1514 Kaki Laba-laba / Oxmosilum Liniare Yellow polybag -
1515 Semak Bawang-bawangan / Ornithogalum umbrellatum polybag -
1516 Semak Kebang Kertas Daun Kecil / Bogenvile small leave polybag -
1517 Semak Lily Paris / Hymenocallis Speciosa polybag -
1518 Semak Daun Philodendron / Philodendron sp polybag -
1519 Semak Bunga Yolanda / Yolanda white flower polybag -
1520 Semak Karembusa Putih / Tebermontana carembusa 'white' polybag -
1521 Semak Simbang Darah / Excoecaria Cochinechinensis polybag -
1522 Semak Bromelia / Bromelia sp polybag -
1523 Pupuk Kandang m3 -

LAIN - LAIN
1524 Air Bersih ltr -
1525 Bak Cuci Aluminium 2 Lubang bh -
1526 Belanja Foto Copy Lembar -
1527 Cangkul bh -
1528 Cangkul Gigi bh -
1529 Ember bh -
1530 Ember Hitam bh -
1531 Gerinding bh -
1532 Helm Proyek bh -
1533 Hammer 3 kg bh -
1534 Instalasi Tata Suara Titik -
1535 Isi Bay Fresh Ruangan bh -
1536 Isi Staples No 30. Pack -
1537 Isi Sabun Hand Soap bh -
1538 Isi Kapur Barus Kg -
1539 Kapi bh -
1540 Keni 2" bh -
1541 Keranjang Sampah bh -
1542 Keset bh -
1543 Lap Kanebo bh -
1544 Lap Pel / Alat Pengepelan bh -
1545 Linggis bh -
1546 Masker bh -
1547 Ompreng Besar (bak Adonan) bh -
1548 Panyong bh -
1549 Pembersih Ban ltr -
1550 Pembersih Lantai Galon -
1551 Pembersih Lantai Toilet bh -
1552 Pembersih Kaca Galon -
1553 Pembersih Toilet Galon -
1554 Pengelasan cm -
1555 Pengharum Mobil Cair Ltr -
1556 Pengharum Ruangan bh -
1557 Sabun bh -
1558 Sabit bh -
1559 Sapu lidi Ikat -
1560 Sapu Ijuk bh -
1561 Sapu Bulu Ayam Super bh -
1562 Shampo Mobil bh -
1563 Sepatu Karet Ltr -
1564 Sikat baja bh -
1565 Sikat Ban bh -
1566 Skop bh -
1567 Tempat Sampah Tutup bh -
1568 Tissue Gulung bh -
1569 Tissue Kotak Pack -
1570 Water mur Bh -
1571 Pipa Tremi dan Casing pelindung Ls -
1572 Pelumas (Oli) Ltr -
1573 Ramset m -
1574 Pembuangan lumpur eks. Bor m3 -
1575 Mobilisasi dan demobilisasi alat bor auger ZKL28 unit -
1576 Mobilisasi dan demobilisasi alat bor auger ZKL28 Unit -
1577 Service Crane kapasitas 50 ton bln -
1578 Excavator PC200 bln -
1579 Pengadaan rail beam untuk pemancangan ls -
1580 Pemotongan kepala tiang pancang turap m' -
1581 Galian tanah untuk capping beam m3 -
1582 Pembuangan tanah galian m3 -
1583 Pekerjaan Cetakan/Tutup Kepala Kolom bh -
1584 Pek. Pembuatan papan nama proyek ls -

Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi / penyesuaian
DAFTAR HARGA SATUAN BAHAN
TAHUN 2020

A. Harga Satuan Bahan

HARGA SATUAN
NO NAMA BARANG SAT. Keterangan
2019 (Rp)

1 2 3 4 5

BIDANG UMUM
1 Jaring Sungar m2
2 Tali Seling m'
3 Tali m'
4 Sekop Datar bh
5 Selang Air m'
6 Terpal m2

BIDANG BINA MARGA


1 Uditch 1000 x 1000 x 1200 K 350 unit
2 Uditch 1200 x 1200 x 1200 K 350 unit
3 Plat Penutup 400 x 1200 K 350 unit
4 Plat Penutup 1200 x 1200 x 1200 K 350 unit
5 Frame Manhole 1200 x 1200 unit
6 Cover Manhole 1200 x 1200 unit
7 Abu Batu m3

BAHAN K3
A Alat Pelindung Diri
1 Topi Pelindung (safety Helmet) bh
2 Pelindung Mata (Goggles, Spectacles) bh
3 Tameng Mata (face Shield) bh
4 Masker Selam (Breathing Apparatus) bh
5 Pelindung Telinga (Ear Plug, Ear Muff) bh
6 Pelindung Pernafasan dan Mulut (Masker) bh
7 Sarung Tangan (Safety Gloves) bh
8 Penunjang Seluruh Tubuh (Full Body Harness) bh
9 Jaket Pelampung (Life Vest) bh
10 Celemek (Apron/Coverralls) bh
11 Pelindung Jatuh (Fall Arrester) bh

B Rambu-Rambu K3 bh
1 Rambu Petunjuk bh
2 Rambu Larangan bh
3 Rambu Peringatan bh
4 Rambu Kewajiban bh
5 Rambu Informasi bh
6 Rambu Pekerjaan Sementara bh
7 Tongkat Pengatur Lalu Lintas (Warning Light Stck) bh
8 Kerucut Lalu Lintas (Traffic Cone) bh
9 Lampu Putar (Rotary Lamp) bh
10 Lampu Selang Lalu Lintas bh

C Pengendaliang Resiko K3
1 Alat Pemadam Api Ringan (APAR) bh
2 Sirine bh
3 Bendera K3 bh
4 Lampu Darurat (Emergency Lamp) bh

BAHAN TAMBAHAN
1 List Gypsum Profil 5 cm m'
2 Bubungan Genteng glazur bh
3 Tempat Sabun bh
4 Kusen Aluminum m'
5 Rangka Jendela Aluminium m'
6 Rangka Pintu Aliminium m'
7 Door Stoper bh
8 Door Closer bh
9 Kusen dan Pintu PVC Toilet unit
10 Genteng Keramik ex Jatiwangi bh
11 Genteng Keramik Glazur ex KANMURI bh
12 Nok Genteng Keramik EX Jatiwangi bh
13 Nok Genteng Keramik Ex Kanmuri bh
14 Kran Zink bh
15 Kran Dinding bh
16 Kitchen Zink bh
17 Floor Drain bh
18 Bak Air Fibergles bh
19 Klep Diameter 3/4" bh
20 Tangkin Air 1000 Liter bh
21 Tangki Air 500 Liter bh
22 Pelampung Otomatis bh
23 Roof Drain Metal bh
24 Mesin Jet Pump kap 250 watt ex Grounfos bh
25 Mesin Pompa Tekan kap. 150 watt ex Grounfos bh
26 Box Panel PVC isi 4 MCB ex Legran bh
27 MCB 6 A ex Legran bh
28 MCB 4 A ex Legran bh
29 Kabel telephone 4 x 0.5 mm m'
30 Oulet TV Broco bh
31 Outlet Telephone bh
32 Dowlight/PLC 13 W bh

Main Truss UK-75-75 M' 27,000.00


Main Truss UK-75-55 M' 22,000.00
Reng AA 0,45 M' 6,200.00
Skrup SDS 8 x 16 Bh 300.00
Skrup SDS 12 x 20 Bh 350.00
Skrup SDS 10 x 16 Bh 250.00
Dynabol 10 x 65 Bh 2,000.00
Diafrakma (PLD) Bh 750.00
Sepatu UK (PK) Bh 20,000.00
Besi Beton Ulir dim 10 mm btng 25000
Besi Plat Siku m' 25000
Besi strip motif bungan bh 45000
Paku Skrup Kg 4500
Bata expose btng 4500
DAFTAR ANALISA PEKERJAAN TAMBAHAN
TAHUN 2019

1 1 M2 PEMBUATAN STEGGER DENGAN SCAFHOLDING 120 x 180 h 190 (Sewa)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0170 112,000.00 1,904.00
Tukang Kayu OH 0.0020 115,000.00 230.00
Kepala Tukang OH 0.2500 115,000.00 28,750.00
Mandor OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 32,574.00
B. BAHAN
Kayu Balok Seseh btg 0.0350 4,150,000.00 145,250.00
Paku 10 kg 0.2000 18,000.00 3,600.00
Main Frame Bh 2.0000 - -
End Frame Bh 2.0000 - -
Cros brace Bh 4.0000 - -
Join Pen Bh 4.0000 - -
U Head Bh 4.0000 - -
Jack Base Bh 4.0000 - -
JUMLAH HARGA BAHAN 148,850.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 181,424.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 181,424.00

2 PEMBESIAN 10 KG DENGAN BESI POLOS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0700 112,000.00 7,840.00
Tukang Besi OH 0.0700 115,000.00 8,050.00
Kepala Tukang OH 0.0070 115,000.00 805.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 17,215.00
B. BAHAN
Besi Polos kg 10.5000 9,800.00 102,900.00
Kawat Beton m3 0.1500 32,000.00 4,800.00
JUMLAH HARGA BAHAN 107,700.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 124,915.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 124,915.00
Harga Satuan Pekerjaan untuk 1 Kg 12,491.50
1 PEMBESIAN 10 KG DENGAN BESI ULIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0700 110,000.00 7,700.00
Tukang Besi OH 0.0700 115,000.00 8,050.00
Kepala Tukang OH 0.0070 115,000.00 805.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 17,075.00
B. BAHAN
Besi Ulir kg 10.5000 - -
Kawat Beton m3 0.1500 32,000.00 4,800.00
JUMLAH HARGA BAHAN 4,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 21,875.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 21,875.00
Harga Satuan Pekerjaan untuk 1 Kg 2,187.50

8 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 112,000.00 5,600.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 8,850.00
B. BAHAN
Murda / Puntal Paras lbr 1.0000 93,000.00 93,000.00
Semen kg 0.0130 1,250.00 16.25
JUMLAH HARGA BAHAN 93,016.25
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 101,866.25
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 101,866.25
XV PEKERJAAN STYLE BALI
1 1 M2 PASANGAN BATA GOSOK 2 MUKA
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 160,000.00 160,000.00
JUMLAH TENAGA KERJA 160,000.00
B. BAHAN
Bata Gosok bh 110.0000 - -
Semen 50 Kg kg 8.4000 1,260.00 10,584.00
JUMLAH HARGA BAHAN 10,584.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 170,584.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 170,584.00

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 160,000.00 160,000.00
JUMLAH TENAGA KERJA 160,000.00
B. BAHAN
Paras Kerobokan bh 13.7500 - -
Semen 50 Kg kg 8.4000 1,260.00 10,584.00
JUMLAH HARGA BAHAN 10,584.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 170,584.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 170,584.00

3 1 M2 PASANGAN BATA PRESS 1 MUKA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 200,000.00 200,000.00
JUMLAH TENAGA KERJA 200,000.00
B. BAHAN
Bata Press bh 55.0000 - -
Semen 50 Kg kg 4.2000 1,260.00 5,292.00
JUMLAH HARGA BAHAN 5,292.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 205,292.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 205,292.00
4 1 M2 PASANGAN PARAS 1 MUKA
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 200,000.00 200,000.00
JUMLAH TENAGA KERJA 200,000.00
B. BAHAN
Batu Paras bh 18.3333 - -
Semen 50 Kg kg 4.2000 1,260.00 5,292.00
JUMLAH HARGA BAHAN 5,292.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 205,292.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 205,292.00

5 1 M2 PASANGAN BATU PALIMANAN TEBAL 3 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 200,000.00 200,000.00
JUMLAH TENAGA KERJA 200,000.00
B. BAHAN
Batu Palimanan bh 12.5000 - -
Semen kg 4.2000 1,260.00 5,292.00
JUMLAH HARGA BAHAN 5,292.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 205,292.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 205,292.00

6 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 200,000.00 200,000.00
JUMLAH TENAGA KERJA 200,000.00
B. BAHAN
Bata Gosok bh 55.0000 - -
Batu Paras bh 4.4917 - -
Semen kg 5.2500 1,260.00 6,615.00
JUMLAH HARGA BAHAN 6,615.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 206,615.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 206,615.00
7 1 M2 PASANGAN BATA GOSOK DIUKIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 355,000.00 355,000.00
JUMLAH TENAGA KERJA 355,000.00
B. BAHAN
Bata Gosok bh 55.0000 - -
Semen 50 Kg kg 4.2000 1,260.00 5,292.00
JUMLAH HARGA BAHAN 5,292.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 360,292.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 360,292.00

8 1 M2 PASANGAN BATU TABAS KARANGASEM DIUKIR


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 355,000.00 355,000.00
JUMLAH TENAGA KERJA 355,000.00
B. BAHAN
Batu Tabas bh 18.3333 - -
Semen 50 Kg kg 4.2000 1,260.00 5,292.00
JUMLAH HARGA BAHAN 5,292.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 360,292.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 360,292.00
9 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 280,000.00 280,000.00
JUMLAH TENAGA KERJA 280,000.00
B. BAHAN
Bata Gosok bh 55.0000 - -
Batu Paras bh 4.4917 - -
Semen 50 Kg kg 5.2500 1,260.00 6,615.00
JUMLAH HARGA BAHAN 6,615.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 286,615.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 286,615.00

10 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP IJUK


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 350,000.00 350,000.00
JUMLAH TENAGA KERJA 350,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 30.0000 - -
Semen 40 kg gresik sak 1.0000 50,000.00 50,000.00
kayu cempaka m3 0.9800 - -
ijuk kg 90.0000 - -
JUMLAH HARGA BAHAN 50,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 400,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 400,000.00
11 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP GENTENG
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 300,000.00 300,000.00
JUMLAH TENAGA KERJA 300,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 26.0000 - -
Semen 40 kg gresik sak 1.0000 50,000.00 50,000.00
kayu cempaka m3 0.7600 - -
genteng plentong bh 90.0000 - -
bubungan mini bh 20.0000 7,000.00 140,000.00
JUMLAH HARGA BAHAN 190,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 490,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 490,000.00

12 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP IJUK


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 350,000.00 350,000.00
JUMLAH TENAGA KERJA 350,000.00
B. BAHAN
Bata gosok ex tulikup bh 150.0000 2,800.00 420,000.00
paras silakarang bh 100.0000 - -
Semen 40 kg gresik sak 1.0000 50,000.00 50,000.00
kayu cempaka m3 0.9800 - -
ijuk kg 98.0000 - -
JUMLAH HARGA BAHAN 470,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 820,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 820,000.00
13 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP GENTENG
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 300,000.00 300,000.00
JUMLAH TENAGA KERJA 300,000.00
B. BAHAN
Bata gosok ex tulikup bh 125.0000 2,800.00 350,000.00
paras silakarang bh 82.0000 - -
kayu cempaka m3 0.7650 - -
Semen 40 kg gresik sak 1.0000 50,000.00 50,000.00
genteng plentong bh 90.0000 - -
bubungan mini bh 20.0000 7,000.00 140,000.00
JUMLAH HARGA BAHAN 540,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 840,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 840,000.00

14 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP IJUK 190cmX190cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 800,000.00 800,000.00
JUMLAH TENAGA KERJA 800,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 65.0000 - -
Semen 40 kg gresik sak 1.2000 50,000.00 60,000.00
kayu cempaka m3 1.8500 - -
ijuk kg 315.0000 - -
JUMLAH HARGA BAHAN 60,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 860,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 860,000.00
15 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP GENTENG 190cmx190cm #NAME?
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 700,000.00 700,000.00
JUMLAH TENAGA KERJA 700,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 65.0000 - -
Semen 40 kg gresik sak 1.2000 50,000.00 60,000.00
kayu cempaka m3 1.4000 - -
genteng plentong bh 110.0000 - -
bubungan mini bh 40.0000 7,000.00 280,000.00
JUMLAH HARGA BAHAN 340,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,040,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,040,000.00

16 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP IJUK 190cmx190cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 750,000.00 750,000.00
JUMLAH TENAGA KERJA 750,000.00
B. BAHAN
Bata ex tulikup bh 305.0000 2,800.00 854,000.00
paras silakarang bh 210.0000 - -
Semen 40 kg gresik sak 1.2000 50,000.00 60,000.00
kayu cempaka m3 1.8800 - -
ijuk kg 315.0000 - -
JUMLAH HARGA BAHAN 914,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,664,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,664,000.00
17 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP GENTENG 190cmx190cm
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 750,000.00 750,000.00
JUMLAH TENAGA KERJA 750,000.00
B. BAHAN
Bata ex tulikup bh 305.0000 2,800.00 854,000.00
paras silakarang bh 210.0000 - -
Semen 40 kg gresik sak 1.4300 50,000.00 71,500.00
kayu cempaka m3 1.8800 - -
genteng plentong m3 110.0000 - -
bubungan mini kg 40.0000 7,000.00 280,000.00
JUMLAH HARGA BAHAN 1,205,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,955,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,955,500.00

18 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP IJUK 200CMX200CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 1,550,000.00 1,550,000.00
JUMLAH TENAGA KERJA 1,550,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 230.0000 - -
Semen 40 kg gresik sak 4.0000 50,000.00 200,000.00
kayu cempaka m3 3.2400 - -
ijuk kg 470.0000 - -
JUMLAH HARGA BAHAN 200,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,750,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,750,000.00
19 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP GENTENG 200CMX200CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 1,550,000.00 1,550,000.00
JUMLAH TENAGA KERJA 1,550,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 230.0000 - -
Semen 40 kg gresik sak 4.0000 50,000.00 200,000.00
kayu cempaka m3 3.0000 - -
genteng plentong bh 225.0000 - -
bubungan mini bh 75.0000 7,000.00 525,000.00
JUMLAH HARGA BAHAN 725,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,275,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 2,275,000.00

20 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP IJUK 200CMX200CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 1,550,000.00 1,550,000.00
JUMLAH TENAGA KERJA 1,550,000.00
B. BAHAN
Bata ex tulikup bh 525.0000 2,800.00 1,470,000.00
paras silakarang bh 350.0000 - -
Semen 40 kg gresik sak 5.5000 50,000.00 275,000.00
kayu cempaka m3 3.2400 - -
ijuk kg 470.0000 - -
JUMLAH HARGA BAHAN 1,745,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 3,295,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 3,295,000.00

21 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP GENTENG 200CMX200CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 1,550,000.00 1,550,000.00
JUMLAH TENAGA KERJA 1,550,000.00
B. BAHAN
Bata ex tulikup bh 525.0000 2,800.00 1,470,000.00
paras silakarang bh 350.0000 - -
Semen 40 kg gresik sak 5.5000 50,000.00 275,000.00
kayu cempaka m3 3.0000 - -
genteng plentong bh 225.0000 - -
bubungan mini bh 75.0000 7,000.00 525,000.00
JUMLAH HARGA BAHAN 2,270,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,270,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 2,270,000.00
22 1 UNIT SANGGAH TAKSU BATU HITAM ATAP IJUK 40cmx40cm
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 300,000.00 300,000.00
JUMLAH TENAGA KERJA 300,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 20.0000 - -
Semen 40 kg gresik sak 0.7500 50,000.00 37,500.00
kayu cempaka m3 0.6300 - -
ijuk kg 75.0000 - -
JUMLAH HARGA BAHAN 37,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 337,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 337,500.00

23 1 UNIT SANGGAH TAKSU BATU HITAM ATAP GENTENG 40cmx40cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 300,000.00 300,000.00
JUMLAH TENAGA KERJA 300,000.00
B. BAHAN
Batu hitam singaraja 20 x 40 bh 21.0000 - -
Semen 40 kg gresik sak 0.7500 50,000.00 37,500.00
kayu cempaka m3 0.6300 - -
genteng plentong bh 75.0000 - -
bubungan mini bh 16.0000 7,000.00 112,000.00
JUMLAH HARGA BAHAN 149,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 449,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 449,500.00
24 1 UNIT SANGGAH TAKSU PARAS BATA ATAP IJUK 40cmx40cm
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 300,000.00 300,000.00
JUMLAH TENAGA KERJA 300,000.00
B. BAHAN
Bata gosok ex tulikup bh 100.0000 2,800.00 280,000.00
paras silakarang bh 75.0000 - -
Semen 40 kg gresik sak 0.8500 50,000.00 42,500.00
kayu cempaka m3 0.6150 - -
ijuk kg 75.0000 - -
JUMLAH HARGA BAHAN 322,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 622,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 622,500.00

25 1 UNIT SANGGAH TAKSU PARAS BATA ATAP GENTENG 40cmx40cm


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Upah Kerja (Lumpsum) ls 1.0000 300,000.00 300,000.00
JUMLAH TENAGA KERJA 300,000.00
B. BAHAN
Bata gosok ex tulikup bh 100.0000 2,800.00 280,000.00
paras silakarang bh 75.0000 - -
Semen 40 kg gresik sak 0.8500 50,000.00 42,500.00
kayu cempaka m3 0.6000 - -
genteng plentong bh 70.0000 - -
bubungan mini bh 16.0000 7,000.00 112,000.00
JUMLAH HARGA BAHAN 434,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 734,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 734,500.00

XVI PEKERJAAN HARDDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
Paving 10 x 20 cm tebal 6 cm K225 m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00
2 1 M2 PASANGAN Paving 10 x 20 cm tebal 6 cm K350
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
Paving 10 x 20 cm tebal 6 cm K350 m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

3 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K225


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
Paving 10 x 20 cm tebal 8 cm K225 m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

4 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K350


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
Paving 10 x 20 cm tebal 8 cm K350 m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00
5 1 M2 PASANGAN Paving 20 x 20 cm tebal 6 cm K350
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving 20 x 20 cm tebal 6 cm K350 m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

6 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K225


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K225 m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

7 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K350


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K350 m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00
8 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 pc
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 pc m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

9 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 merah m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

10 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 hitam m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00
11 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 pc
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 pc m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

12 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 merah m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

13 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 merah m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00
14 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 pc
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 pc m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

15 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 merah m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

16 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 hitam m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00
17 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 pc
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 pc m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

18 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 merah m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

19 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 hitam m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00
20 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 pc
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 pc m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

21 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 merah m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

22 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 hitam m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00
23 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 pc
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 pc m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

24 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 merah


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 merah m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

25 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 hitam


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 hitam m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00
26 1 M2 PASANGAN Paving Tiga Berlian tebal 6 cm K225 pc
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Pekerja OH 0.5000 112,000.00 56,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 88,000.00
B. BAHAN
1 M2 PASANGAN Paving Tiga Berlian tebal 6 cm K225 pc m2 1.0500 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,000.00

27 1 M2 PASANGAN GRASS BLOCK


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.5000 115,000.00 57,500.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Pekerja OH 1.0000 112,000.00 112,000.00
Mandor OH 0.0500 130,000.00 175,250.00
JUMLAH TENAGA KERJA
B. BAHAN
Grass Block m2 1.0000 - -

-
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) -

28 1 M2 PASANGAN KORAL SIKAT


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.2500 115,000.00 28,750.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Pekerja OH 0.6250 112,000.00 70,000.00
Mandor OH 0.0310 130,000.00 4,030.00
JUMLAH TENAGA KERJA 103,930.00
B. BAHAN
Koral Sikat zak 1.2000 - -
Semen zak 9.2800 1,260.00 11,692.80
Pasir pasang m3 0.2000 195,000.00 39,000.00
JUMLAH HARGA BAHAN 50,692.80
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 50,692.80
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 50,692.80
29 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 115,000.00 40,250.00
Pekerja OH 0.9500 112,000.00 106,400.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA KERJA 148,756.00
B. BAHAN
Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 bh 2.0000 - -
Semen 50 Kg kg 2.1000 1,250.00 2,625.00
Pasir Urug m3 0.0060 195,000.00 1,170.00
JUMLAH HARGA BAHAN 3,795.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 152,551.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 152,551.00

30 Kanstein Jumbo (P:50,L:15,T:30 cm K225)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 115,000.00 40,250.00
Pekerja OH 0.9500 112,000.00 106,400.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA KERJA 148,756.00
B. BAHAN
Kanstein Jumbo (P:50,L:15,T:30 cm K225) bh 2.0000 - -
Semen kg 2.1000 1,250.00 2,625.00
Pasir Urug m3 0.0060 195,000.00 1,170.00
JUMLAH HARGA BAHAN 3,795.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 152,551.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 152,551.00

31 Kanstein kotak (P:50,t.20,La.10,Lb.16cm) K225


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 115,000.00 40,250.00
Pekerja OH 0.9500 112,000.00 106,400.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA KERJA 148,756.00
B. BAHAN
Kanstein kotak (P:50,t.20,La.10,Lb.16cm) K225 bh 2.0000 - -
Semen kg 2.1000 1,250.00 2,625.00
Pasir Urug m3 0.0060 195,000.00 1,170.00
JUMLAH HARGA BAHAN 3,795.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 152,551.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 152,551.00
32 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 )
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 115,000.00 40,250.00
Pekerja OH 0.9500 112,000.00 106,400.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA KERJA 148,756.00
B. BAHAN
Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) bh 2.0000 - -
Semen kg 2.1000 1,250.00 2,625.00
Pasir Urug m3 0.0060 195,000.00 1,170.00
JUMLAH HARGA BAHAN 3,795.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 152,551.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 152,551.00

33 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 )


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 115,000.00 40,250.00
Pekerja OH 0.9500 112,000.00 106,400.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA KERJA 148,756.00
B. BAHAN
Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) bh 2.0000 - -
Semen kg 2.1000 1,250.00 2,625.00
Pasir Urug m3 0.0060 195,000.00 1,170.00
JUMLAH HARGA BAHAN 3,795.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 152,551.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 152,551.00

34 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 115,000.00 40,250.00
Pekerja OH 0.9500 112,000.00 106,400.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA KERJA 148,756.00
B. BAHAN
Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) bh 2.0000 - -
Semen kg 2.1000 1,250.00 2,625.00
Pasir Urug m3 0.0060 195,000.00 1,170.00
JUMLAH HARGA BAHAN 3,795.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 152,551.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 152,551.00
35 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 115,000.00 40,250.00
Pekerja OH 0.9500 112,000.00 106,400.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA KERJA 148,756.00
B. BAHAN
Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) bh 2.0000 - -
Semen kg 2.1000 1,250.00 2,625.00
Pasir Urug m3 0.0060 195,000.00 1,170.00
JUMLAH HARGA BAHAN 3,795.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 152,551.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 152,551.00

36 1 Buah Pasangan Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 115,000.00 40,250.00
Pekerja OH 0.9500 112,000.00 106,400.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA KERJA 148,756.00
B. BAHAN
1 Buah Pasangan Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) bh 2.0000 - -
Semen kg 2.1000 1,250.00 2,625.00
Pasir Urug m3 0.0060 195,000.00 1,170.00
JUMLAH HARGA BAHAN 3,795.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 152,551.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 152,551.00

37 1 M2 PENGECATAN KANSTEIN
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Cat OH 0.0300 115,000.00 3,450.00
Kepala Tukang OH 0.0030 115,000.00 345.00
Pekerja OH 0.1500 112,000.00 16,800.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 22,545.00
B. BAHAN
Cat kg 0.2840 - -
Thiner kg 0.0710 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 22,545.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 22,545.00
38 PASANGAN BUIS BETON DIAMETER 80 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0075 115,000.00 862.50
Pekerja OH 0.2000 112,000.00 22,400.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 34,487.50
B BAHAN
Buis Beton Diameter 80 cm BJ 1.0000 - -
Semen 40 Kg Zak 0.0030 50,000.00 150.00
Pasir Pasang m3 0.0130 215,000.00 2,795.00
JUMLAH HARGA BAHAN 2,945.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 37,432.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 37,432.50

39 PASANGAN Buis Beton Diameter 50 x 75


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.0750 115,000.00 8,625.00
Kepala Tukang Batu OH 0.0075 115,000.00 862.50
Pekerja OH 0.2000 112,000.00 22,400.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 34,487.50
B BAHAN
Buis Beton Diameter 50 x 75 BJ 1.0000 - -
Semen 40 Kg Zak 0.0030 50,000.00 150.00
Pasir Pasang m3 0.0130 215,000.00 2,795.00
JUMLAH HARGA BAHAN 2,945.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 37,432.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 37,432.50

40 PASANGAN BUIS BETON DIAMETER 25 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.0750 115,000.00 8,625.00
Kepala Tukang Batu OH 0.0075 115,000.00 862.50
Pekerja OH 0.2000 112,000.00 22,400.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 34,487.50
B BAHAN
Buis Beton Diameter 80 cm BJ 1.0000 - -
Semen 40 Kg Zak 0.0030 50,000.00 150.00
Pasir Pasang m3 0.0130 215,000.00 2,795.00
JUMLAH HARGA BAHAN 2,945.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 37,432.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 37,432.50
41 1 M2 BONGKARAN PAVING LAMA
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.100 112,000.00 11,200.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 11,850.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 11,850.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 11,850.00

42 1 M3 PENGURUGAN DENGAN LIMESTONE


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2500 112,000.00 28,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 31,250.00
B. BAHAN
Limestone m3 1.2000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 31,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 31,250.00

43 PASANGAN BUIS BETON DIAMETER 100 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0075 115,000.00 862.50
Pekerja OH 0.2000 112,000.00 22,400.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA K ` 34,487.50
B. BAHAN
Buis Beton Diameter 100 cm Bj 1.0000 - -
Semen 40 Kg Zak 0.0030 50,000.00 150.00
Pasir Pasang m3 0.0130 215,000.00 2,795.00
JUMLAH HARGA BAHAN 2,945.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 37,432.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 37,432.50
1 M' Pasangan Buis Beton Diameter 100 cm = 2 x 285.070,00 74,865.00
44 PASANGAN BUIS BETON DIAMETER 80 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.0750 115,000.00 8,625.00
Kepala Tukang Batu OH 0.0075 115,000.00 862.50
Pekerja OH 0.2000 112,000.00 22,400.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA K ` 34,487.50
B. BAHAN
Buis Beton Diameter 80 cm BJ 1.0000 - -
Semen 40 Kg Zak 0.0030 50,000.00 150.00
Pasir Pasang m3 0.0130 215,000.00 2,795.00
JUMLAH HARGA BAHAN 2,945.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 37,432.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 37,432.50
1 M' Pasangan Buis Beton Diameter 80 cm = 2 x 130.070,00 74,865.00

45 PASANGAN BUIS BETON DIAMETER 50 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.0750 - -
Kepala Tukang Batu OH 0.0075 - -
Pekerja OH 0.2000 - -
Mandor OH 0.0200 - -
JUMLAH TENAGA K ` -
B. BAHAN
Buis Beton Diameter 50 cm BJ 1.0000 - -
Semen 40 Kg Zak 0.0030 50,000.00 150.00
Pasir Pasang m3 0.0130 215,000.00 2,795.00
JUMLAH HARGA BAHAN 2,945.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,945.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,945.00
1 M' Pasangan Buis Beton Diameter 50 cm = 1.33 x 130.070,00 3,916.85

46 PASANGAN BUIS BETON DIAMETER 25 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.0750 - -
Kepala Tukang Batu OH 0.0075 - -
Pekerja OH 0.2000 - -
Mandor OH 0.0200 - -
JUMLAH TENAGA K ` -
B. BAHAN
Buis Beton Diameter 25 cm BJ 1.0000 - -
Semen 40 Kg Zak 0.0030 50,000.00 150.00
Pasir Pasang m3 0.0130 215,000.00 2,795.00
JUMLAH HARGA BAHAN 2,945.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,945.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,945.00
1 M' Pasangan Buis Beton Diameter 25 cm = 1,33 x 130.070,00 3,916.85
1 M' Pasangan 1/2 Buis Beton Diameter 25 cm = 0,5 x 120.070,00 1,472.50
47 1 M' KANSTEIN SEGI LIMA (P:50:15,T:20)K-225
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 115,000.00 40,250.00
Pekerja OH 0.9500 112,000.00 106,400.00
Mandor OH 0.0162 130,000.00 2,106.00
JUMLAH TENAGA K ` 148,756.00
B. BAHAN
Kanstein Segi Lima (P:50, L:15, T:20 cm K-225) BJ 2.0000 - -
Semen kg 2.1000 1,250.00 2,625.00
Pasir urug m3 0.0600 195,000.00 11,700.00
JUMLAH HARGA BAHAN 14,325.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 163,081.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 163,081.00

48 1 M' KANSTEIN KURSI K-225


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.3500 115,000.00 40,250.00
Pekerja OH 0.9500 120,000.00 114,000.00
Mandor OH 0.0162 105,000.00 1,701.00
JUMLAH TENAGA K ` 155,951.00
B. BAHAN
Kanstein Kursi K-225 BJ 2.0000 - -
Semen kg 2.1000 1,250.00 2,625.00
Pasir urug m3 0.0060 195,000.00 1,170.00
JUMLAH HARGA BAHAN 3,795.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 159,746.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 159,746.00
49 1 M3 PASANGAN PONDASI SIKLOP, 60% BETON CAMPURAN 1 SP : 2 PB : 3 KR DAN 40% BATU BELAH
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.400 112,000.00 380,800.00
Tukang Batu OH 0.850 115,000.00 97,750.00
Kepala Tukang OH 0.085 115,000.00 9,775.00
Mandor OH 0.170 130,000.00 22,100.00
JUMLAH TENAGA KERJA 510,425.00
B. BAHAN
Batu Belah m3 0.480 205,000.00 98,400.00
Semen portland (Gersik) kg 194.000 1,250.00 242,500.00
Pasir Beton m3 0.312 195,000.00 60,840.00
Koral Beton m3 0.468 412,000.00 192,816.00
JUMLAH HARGA BAHAN 594,556.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,104,981.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,104,981.00

EE. KONSULTAN

13 1 BH BONGKARAN KUSEN PINTU JENDELA


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.7500 112,000.00 84,000.00
Mandor OH 0.0708 130,000.00 9,199.74
JUMLAH TENAGA KERJA 93,199.74
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 93,199.74
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 93,199.74

14 1 M2 BONGKARAN KERAMIK LANTAI


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 28,900.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 28,900.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 28,900.00

15 1 M2 BONGKARAN GENTENG & BUBUNGAN


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.0750 112,000.00 8,400.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 9,700.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 9,700.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 9,700.00

16 1 M2 BONGKARAN KAP KONSTRUKSI KAYU


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 27,600.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 27,600.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 27,600.00

16 1 M2 BONGKARAN PENUTUP PLAFOND TRIPLEK


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.0300 112,000.00 3,360.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 3,750.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 3,750.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 3,750.00

16 1 M2 BONGKARAN LISTPLANK
KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Mandor OH 0.0283 130,000.00 3,679.90
JUMLAH TENAGA KERJA 37,279.90
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 37,279.90
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 37,279.90

16 1 M2 PENGELUPASAN PLESTERAN LAMA


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 12,500.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 12,500.00

16 1 M2 PEMBONGKARAN RENG LAMA


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.0500 112,000.00 5,600.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 6,900.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 6,900.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 6,900.00

1 1 M2 Pek. Pemasangan Kuda-kuda Baja Ringan UK.75

NO. URAIAN SATUAN KOEFISIEN

A. TENAGA
Pekerja OH 0.2470 112,000.00 27,664.00
Tukang besi OH 0.1760 115,000.00 20,240.00
Kepala Tukang OH 0.1176 115,000.00 13,524.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 67,928.00
B. BAHAN
Main Truss UK-75-75 M' 2.2000 27,000.00 59,400.00
Main Truss UK-75-55 M' 3.6000 22,000.00 79,200.00
Reng AA 0,45 M' 7.7000 6,200.00 47,740.00
Skrup SDS 8 x 16 Bh 13.0000 300.00 3,900.00
Skrup SDS 12 x 20 Bh 28.0000 350.00 9,800.00
Skrup SDS 10 x 16 Bh 14.0000 250.00 3,500.00
Dynabol 10 x 65 Bh 0.5000 2,000.00 1,000.00
Diafrakma (PLD) Bh 10.0000 750.00 7,500.00
Sepatu UK (PK) Bh 0.5000 20,000.00 10,000.00

JUMLAH HARGA BAHAN 222,040.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 289,968.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 289,968.00

1 1 M2 Pek. Pemasangan listplank conwood

NO. URAIAN SATUAN KOEFISIEN

A. TENAGA
Pekerja OH 0.0500 112,000.00 5,600.00
Tukang bayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 20,700.00
B. BAHAN
Conwood plank 8" M' 1.1000 - -
paku skrup kg 0.1000 49,000.00 4,900.00

JUMLAH HARGA BAHAN 4,900.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 25,600.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 25,600.00

9 1 M2 PLAFOND GYPSUM 9 MM, RANGKA HOLLOW 3,5 X 3,5


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)
A. TENAGA
Pekerja OH 0.2500 112,000.00 28,000.00
Tukang Kayu OH 0.3000 115,000.00 34,500.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 68,475.00
B. BAHAN
Gypsum Board (120x240x9) Lbr 0.3640 79,200.00 28,828.80
Hollow galvalume 3,5 x 3,5 m' 3.3000 7,500.00 24,750.00
Wall angle m' 1.2500 5,000.00 6,250.00
paku sekrup hollow Ktk 0.1100 49,000.00 5,390.00
paku beton Ktk 0.0500 58,000.00 2,900.00

JUMLAH HARGA BAHAN 68,118.80


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 136,593.80
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 136,593.80

14.a 1 M1 Pasang List Gypsum tempel 1/5 cm


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.0100 112,000.00 1,120.00
Tukang Kayu OH 0.0200 115,000.00 2,300.00
Kepala Tukang OH 0.0040 115,000.00 460.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 4,140.00
B. BAHAN
List gypsum 7cm m' 1.0500 14,000.00 14,700.00
Cornice kg 0.5000 2,000.00 1,000.00
JUMLAH HARGA BAHAN 15,700.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 19,840.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 19,840.00

30 MEMASANG 1 M' RAM VENTILASI 1,5/10 CM DARI PAPAN KAYU KELAS I


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.0500 112,000.00 5,600.00
Tukang kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 18,900.00
B. BAHAN
Papan Kayu Kamper m3 0.0022 9,500,000.00 20,900.00
Paku 5 Cm dan 10 Cm Kg 0.0500 18,000.00 900.00
Lem Kg 0.0500 16,000.00 800.00
JUMLAH HARGA BAHAN 22,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 41,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 41,500.00

16.a 1 Bh Grendel
KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.0050 112,000.00 560.00
Tukang Kayu OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 10,465.00
B. BAHAN
Grendel pintu BH 1.0000 190,000.00 190,000.00
JUMLAH HARGA BAHAN 190,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 200,465.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 200,465.00

1 PS Pasang Grendel Espanonyet


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.0150 112,000.00 1,680.00
Tukang Kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 19,580.00
B. BAHAN
Grendel exspanoyet BH 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 50,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 69,580.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 69,580.00

4 1 TITIK PEMASANGAN LAMPU LED 10 watt + Fiting


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Biaya Pasang ttk 1.0000 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Lampu LED Philip 10 watt bh 1.0000 - -
Fiting bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) -

5 1 BH PEMASANGAN SAKLAR TUNGGA:


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Biaya Pasang ttk 1.0000 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Saklar tunggal bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) -

6 1 BH PEMASANGAN SAKLAR GANDA


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Biaya Pasang ttk 1.0000 15,000.00 15,000.00
JUMLAH TENAGA KERJA 15,000.00
B. BAHAN
Saklar ganda bh 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 50,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,000.00

7 1 BH PEMASANGAN STOP KONTAK


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Biaya Pasang ttk 1.0000 15,000.00 15,000.00
JUMLAH TENAGA KERJA 15,000.00
B. BAHAN
Stop Kontak bh 1.0000 40,000.00 40,000.00
JUMLAH HARGA BAHAN 40,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 55,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 55,000.00

2 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4,5 MM


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang Kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 24,500.00
B. BAHAN
Kalsiboard lbr 0.3750 - -
Paku biasa 1/2" - 1" kg 0.0300 18,000.00 540.00
JUMLAH HARGA BAHAN 540.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 25,040.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 25,040.00

22 MEMASANG 1 M2 RANGKA LANGIT-LANGIT PENYESUAIAN DARI RANGKA 50X100 KE 60X90


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.0600 112,000.00 6,720.00
Tukang kayu OH 0.1200 115,000.00 13,800.00
Kepala Tukang OH 0.0120 115,000.00 1,380.00
Mandor OH 0.0300 130,000.00 3,900.00
JUMLAH TENAGA KERJA 25,800.00
B. BAHAN
Usuk Albesia m3 0.0065 - -
Paku 7 Cm dan 10 Cm Kg 0.1000 18,000.00 1,800.00
JUMLAH HARGA BAHAN 1,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 27,600.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 27,600.00

30 1 M2 PEMBUATAN TRALIS BESI BERMOTIF


KOEFISIEN
NO. URAIAN SATUAN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 1.2500 112,000.00 140,000.00
Tukang besi OH 2.5000 115,000.00 287,500.00
Tukang cat OH 0.7500 115,000.00 86,250.00
Kepala Tukang OH 0.2500 115,000.00 28,750.00
Mandor OH 0.1250 130,000.00 16,250.00
JUMLAH TENAGA KERJA 558,750.00
B. BAHAN
Besi Beton Ulir dim 10 mm btng 1.1000 25,000.00 27,500.00
Besi Plat Siku m' 4.4000 25,000.00 110,000.00
Besi strip motif bungan bh 3.0000 45,000.00 135,000.00
Paku Skrup Kg 0.1000 4,500.00 450.00
Bahan Las Ls 1.0000 - -
Cat meni besi kg 0.1000 - -
Cat besi kg 0.2000 - -

JUMLAH HARGA BAHAN 272,950.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 831,700.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 831,700.00

5 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK EKTERIOR LAMA 2 LAPIS DENGAN ROLL


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 0.0400 112,000.00 4,480.00
Tukang cat OH 0.0300 115,000.00 3,450.00
Kepala Tukang OH 0.0030 115,000.00 345.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 8,535.00
B. BAHAN
Cat Tembok Dulux kg 0.4700 - -
Roll Bh 0.0100 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 8,535.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 8,535.00

6 1 UNIT FINISHING BATA PRES ORNAMEN PEPALIHAN PADA PINTU


KOEFISIEN
NO. URAIAN SATUAN

A. TENAGA
Pekerja OH 9.0000 112,000.00 1,008,000.00
Tukang style bali OH 18.0000 160,000.00 2,880,000.00
Kepala Tukang style bali OH 2.0000 180,000.00 360,000.00
Mandor STYLE BALI OH 1.0000 200,000.00 200,000.00
JUMLAH TENAGA KERJA 4,448,000.00
B. BAHAN
Bata expose bh 800.0000 4,500.00 3,600,000.00
Semen Kg 155.0000 1,250.00 193,750.00
Pasir pasang M3 0.5000 215,000.00 107,500.00

JUMLAH HARGA BAHAN 3,901,250.00


C. PERALATAN
Alat bantu Ls 1.0000 - -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 8,349,250.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 8,349,250.00

### 1 M2 Coating Batu Alam


KOEFISIEN
NO. URAIAN SATUAN
A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang cat OH 0.0630 115,000.00 7,245.00
Kepala Tukang OH 0.0063 115,000.00 724.50
Mandor OH 0.0025 130,000.00 325.00
JUMLAH TENAGA KERJA 19,494.50
B. BAHAN
Coaitng ltr 0.3000 - -
Tinner ltr 0.3000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 19,494.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E)
DAFTAR ANALISA PEKERJAAN
TAHUN 200

I HARGA SATUAN PEKERJAAN PERSIAPAN (PERMEN PUPR 28/PRT/M/2016)

1 1 M2 PAGAR SEMENTARA DARI KAYU TINGGI 2 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Kayu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 72,700.00
B. BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.250 - -
Semen portland (Gersik) Kg 5.000 1,250.00 6,250.00
Pasir beton m3 0.005 195,000.00 975.00
Koral beton m3 0.009 412,000.00 3,708.00
Kayu 5/7 m3 0.072 - -
paku biasa 2"-5" Kg 0.060 18,000.00 1,080.00
Residu Liter 0.400 - -
JUMLAH HARGA BAHAN 12,013.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 84,713.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 84,713.00

2 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.200 112,000.00 22,400.00
Tukang Kayu OH 0.400 115,000.00 46,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.020 130,000.00 2,600.00
JUMLAH TENAGA KERJA 73,300.00
B. BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.250 - -
Semen portland (Gersik) kg 2.50 1,250.00 3,125.00
Seng gelombang Lbr 1.20 - -
Pasir Beton m3 0.005 195,000.00 975.00
Koral beton m3 0.009 412,000.00 3,708.00
Kayu 5/7 m3 0.072 - -
Paku biasa 2" - 5" kg 0.060 18,000.00 1,080.00
Meni Besi Liter 0.45 - -
JUMLAH HARGA BAHAN 8,888.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 82,188.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 82,188.00
3 1 M2 PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.200 112,000.00 22,400.00
Tukang kayu OH 0.300 115,000.00 34,500.00
Kepala tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.020 130,000.00 2,600.00
JUMLAH TENAGA KERJA 61,800.00
B. BAHAN
Dolken kayu Ø 8 -10/ 400 cm Batang 1.00 - -
Semen portland (Gersik) Kg 2.000 1,250.00 2,500.00
Kawat duri M' 25.000 - -
Pasir beton m3 0.005 195,000.00 975.00
Koral beton m3 0.009 412,000.00 3,708.00
Paku biasa 2" - 5" Kg 0.060 18,000.00 1,080.00

JUMLAH HARGA BAHAN 2,500.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 64,300.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 64,300.00

4 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.10 112,000.00 11,200.00
Tukang kayu OH 0.10 115,000.00 11,500.00
Kepala tukang OH 0.01 115,000.00 1,150.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 24,500.00
B. BAHAN
Kayu balok 5/7 m3 0.012 - -
Paku 2" - 3" Kg 0.02 18,000.00 360.00
Kayu Papan 3/20 m3 0.007 - -
JUMLAH HARGA BAHAN 360.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,860.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 24,860.00
5 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.00 112,000.00 224,000.00
Tukang kayu OH 2.00 115,000.00 230,000.00
Tukang batu OH 1.00 115,000.00 115,000.00
Kepala tukang OH 0.30 115,000.00 34,500.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 610,000.00
B. BAHAN
Dolken Kayu Ø 8 - 10/400 cm Batang 1.250 - -
Kayu m3 0.180 - -
Paku Biasa kg 0.850 18,000.00 15,300.00
Besi Strip kg 1.100 - -
Semen portland (Gersik) kg 35.000 1,250.00 43,750.00
Pasir Pasang m3 0.150 215,000.00 32,250.00
Pasir Beton m3 0.100 195,000.00 19,500.00
Koral Beton m3 0.150 412,000.00 61,800.00
Bata Merah bh 30.000 - -
Seng Plat lbr 0.250 - -
Jendela Nako bh 0.200 - -
Kaca Polos m2 0.080 - -
Kunci Tanam bh 0.150 246,000.00 36,900.00
Plywood 4 mm lbr 0.060 180,000.00 10,800.00
JUMLAH HARGA BAHAN 220,300.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 830,300.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 830,300.00

6 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.00 112,000.00 112,000.00
Tukang Kayu OH 2.00 115,000.00 230,000.00
Kepala Tukang OH 0.20 115,000.00 23,000.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 371,500.00
B. BAHAN
Dolken kayu diameter 8-10/400 cm btg 1.70 - -
Kayu Meranti m3 0.210 - -
Paku Biasa 2" - 5" kg 0.300 18,000.00 5,400.00
Semen portland (Gersik) kg 10.50 1,250.00 13,125.00
Pasir Beton m3 0.03 195,000.00 5,850.00
Koral Beton m3 0.05 412,000.00 20,600.00
Seng gelombang BJLS 30 lbr 1.50 - -
Seng Pelat Lbr 0.250 - -
JUMLAH HARGA BAHAN 44,975.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 416,475.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 416,475.00
7 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.00 112,000.00 112,000.00
Tukang kayu OH 1.50 115,000.00 172,500.00
Kepala tukang OH 0.15 115,000.00 17,250.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 308,250.00
B. BAHAN
Dolken kayu Ø 8-10/400 cm Batang 3.00 - -
Kayu m3 0.276 - -
Paku Biasa Kg 0.700 18,000.00 12,600.00
Seng gelombang Kg 1.500 - -
JUMLAH HARGA BAHAN 12,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 320,850.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 320,850.00

8 1 M2 MEMBERSIHKAN LAPANGAN DAN PERALATAN


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.10 112,000.00 11,200.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 17,700.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 17,700.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 17,700.00

9 1 M2 PEMBUATAN BEDENG BURUH


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.00 112,000.00 224,000.00
Tukang Kayu OH 1.00 115,000.00 115,000.00
Kepala tukang OH 0.20 115,000.00 23,000.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 368,500.00
B. BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.25 - -
Kayu m3 0.186 - -
Paku Biasa kg 0.300 18,000.00 5,400.00
Semen portland (Gersik) kg 18.00 1,250.00 22,500.00
Pasir Beton m3 0.03 195,000.00 5,850.00
Koral Beton m3 0.05 412,000.00 20,600.00
Seng gelombang lbr 1.50 - -
Plywood 4 mm lbr 1.350 180,000.00 243,000.00
JUMLAH HARGA BAHAN 297,350.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 665,850.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 665,850.00
10 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X25) CM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu OH 0.30 112,000.00 33,600.00
Kepala tukang OH 0.03 115,000.00 3,450.00
JUMLAH TENAGA KERJA 37,050.00
B. BAHAN
Kayu papan kelas III m3 0.036 - -
Kayu balok 5/7 kelas III m3 0.014 18,000.00 252.00
Paku Biasa kg 0.08 - -
JUMLAH HARGA BAHAN 252.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 37,302.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 37,302.00

11 1 M2 PEMBUATAN STEGGER DARI BAMBU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.00 112,000.00 112,000.00
Tukang kayu OH 2.00 115,000.00 230,000.00
Kepala Tukang OH 0.20 115,000.00 23,000.00
Mandor OH 0.05 130,000.00 6,500.00
JUMLAH TENAGA KERJA 371,500.00
B. BAHAN
Bambu diameter 6-8/600 cm btg 1.25 - -
Tali ijuk m3 0.186 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 371,500.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 371,500.00

12 1 M2 PEMBUATAN JALAN SEMENTARA


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.000 112,000.00 112,000.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 112,650.00
B. BAHAN
Batu Kali m3 0.150 305,000.00 45,750.00
Batu Pecah 5 - 7 m3 0.090 205,000.00 18,450.00
Pasir Pasang m3 0.010 215,000.00 2,150.00
JUMLAH HARGA BAHAN 66,350.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 179,000.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 179,000.00
13 1 M3 BONGKARAN BETON BERTULANG
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 13.334 112,000.00 1,493,408.00
Mandor OH 0.666 130,000.00 86,580.00
JUMLAH TENAGA KERJA 1,579,988.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,579,988.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 1,579,988.00

14 1 M3 BONGKARAN DINDING TEMBOK BATA


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 6.667 112,000.00 746,704.00
Mandor OH 0.333 130,000.00 43,290.00
JUMLAH TENAGA KERJA 789,994.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 789,994.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 789,994.00

15 1 M2 PEMASANGAN PAGAR KAWAT JARING GALVANIS PANJANG 240 CM


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.042 112,000.00 4,704.00
Tukang Besi OH 0.004 115,000.00 460.00
Kepala Tukang OH 0.002 115,000.00 230.00
Mandor OH 0.042 130,000.00 5,460.00
JUMLAH TENAGA KERJA 10,854.00
B. BAHAN
Kawat Jaring ' Lbr 0.1434 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 10,854.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 10,854.00
16 1 M2 PEMASANGAN PANEL BETON PRACETAK 5X50X240 CM UNTUK PAGAR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.375 112,000.00 42,000.00
Tukang kayu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.012 115,000.00 1,380.00
Mandor OH 0.019 130,000.00 2,470.00
JUMLAH TENAGA KERJA 60,225.00
B. BAHAN
Panel beton pracetak Lbr 0.986 - -
Kolom beton pracetak Batang 0.525 - -
Semen PC (Gersik) Kg 45 1,250.00 56,250.00
Pasir Beton m3 0.075 195,000.00 14,625.00
Koral m3 0.146 412,000.00 60,152.00

JUMLAH HARGA BAHAN 131,027.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 191,252.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 191,252.00

17 BONGKAR 1 M3 BETON SECARA KONVENSIONAL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.600 112,000.00 403,200.00
Mandor OH 0.360 130,000.00 46,800.00
JUMLAH TENAGA KERJA 450,000.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 450,000.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 450,000.00

II HARGA SATUAN PEKERJAAN TANAH (PERMEN PUPR 28/PRT/M/2016)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.750 112,000.00 84,000.00
Mandor OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 87,250.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 87,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 87,250.00
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.900 112,000.00 100,800.00
Mandor OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 106,650.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 106,650.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 106,650.00

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.050 112,000.00 117,600.00
Mandor OH 0.067 130,000.00 8,710.00
JUMLAH TENAGA KERJA 126,310.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 126,310.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 126,310.00

4 1 M3 GALIAN TANAH KERAS DALAM 1METER


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.000 112,000.00 112,000.00
Mandor OH 0.032 130,000.00 4,160.00
JUMLAH TENAGA KERJA 116,160.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 116,160.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 116,160.00
5 1 M3 GALIAN TANAH CADAS DALAM 1 METER
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Mandor OH 0.060 130,000.00 7,800.00
JUMLAH TENAGA KERJA 175,800.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATANP
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 175,800.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 175,800.00

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.200 112,000.00 134,400.00
Mandor OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 140,250.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 140,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 140,250.00

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.050 112,000.00 5,600.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 6,250.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 6,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 6,250.00
8 1 M3 PEMBUANGAN TANAH SEJAUH 30 METER
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.330 112,000.00 36,960.00
Mandor OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 38,260.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 38,260.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 38,260.00

9 1 M3 PENGURUGAN KEMBALI GALIAN TANAH


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.500 112,000.00 56,000.00
Mandor OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 62,500.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 62,500.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 62,500.00

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.500 112,000.00 56,000.00
Mandor OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 62,500.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 62,500.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 62,500.00
11 1 M3 URUGAN PASIR
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Mandor OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 34,900.00
B. BAHAN
Pasur Urug m3 1.200 195,000.00 234,000.00
JUMLAH HARGA BAHAN 234,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 268,900.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 268,900.00

12 1 M3 PEMASANGAN LAPISAN PUDEL CAMPURAN 1KP : 3PP : 7TL


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.800 112,000.00 89,600.00
Tukang OH 0.400 115,000.00 46,000.00
Kepala Tukang OH 0.040 115,000.00 4,600.00
Mandor OH 0.080 130,000.00 10,400.00
JUMLAH TENAGA KERJA 150,600.00
B. BAHAN
Kapur Padam m3 0.135 - -
Pasir Pasang m3 0.400 215,000.00 86,000.00
Tanah Liat m3 0.948 - -

JUMLAH HARGA BAHAN 86,000.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 236,600.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 236,600.00

13 1 M2 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.150 112,000.00 16,800.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 18,750.00
B. BAHAN
Ijuk m3 6.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 18,750.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 18,750.00
14 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2500 112,000.00 28,000.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 31,250.00
B. BAHAN
Sirtu m3 1.200 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 31,250.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 31,250.00

15 1 M3 TIMBUNAN PASIR SEBAGAI BAHAN PENGISI


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 - -
Mandor OH 0.0400 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Pasir Pasang M3 1.2000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) -

III HARGA SATUAN PEKERJAAN PONDASI (PERMEN PUPR 28/PRT/M/2016)


1 1 M3 BATU BELAH CAMP. 1 SP : 3 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 115,000.00 8,625.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 272,625.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) Kg 202.000 1,250.00 252,500.00
Pasir Pasang m3 0.485 215,000.00 104,275.00
JUMLAH HARGA BAHAN 602,775.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 875,400.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 875,400.00
2 1 M3 BATU BELAH CAMP. 1 SP : 4 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 115,000.00 8,625.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 272,625.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) Kg 163.000 1,250.00 203,750.00
Pasir Pasang m3 0.520 215,000.00 111,800.00
JUMLAH HARGA BAHAN 561,550.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 834,175.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 834,175.00

3 1 M3 BATU BELAH CAMP. 1 SP : 5 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 115,000.00 8,625.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 272,625.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) kg 136.000 1,250.00 170,000.00
Pasir Pasang m3 0.544 215,000.00 116,960.00
JUMLAH HARGA BAHAN 532,960.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 805,585.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 805,585.00

4 1 M3 BATU BELAH CAMP. 1 SP : 6 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 115,000.00 8,625.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 272,625.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) kg 117.000 1,250.00 146,250.00
Pasir Pasang m3 0.561 215,000.00 120,615.00
JUMLAH HARGA BAHAN 512,865.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 785,490.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 785,490.00
5 1 M3 BATU BELAH CAMP. 1 SP : 8 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 115,000.00 8,625.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 272,625.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) kg 91.000 1,250.00 113,750.00
Pasir Pasang m3 0.584 215,000.00 125,560.00
JUMLAH HARGA BAHAN 485,310.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 757,935.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 757,935.00

6 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1SP : 1KP : 2PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 115,000.00 8,625.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 272,625.00
B. BAHAN
Batu Belah m3 1.200 130,000.00 156,000.00
Kapur kg 0.170 - -
Semen portland (Gersik) m3 0.170 1,250.00 212.50
Pasir Pasang m3 0.340 215,000.00 73,100.00
JUMLAH HARGA BAHAN 229,312.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 501,937.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 501,937.50

7 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1SP : 3KP : 10PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 112,000.00 168,000.00
Tukang Batu OH 0.750 115,000.00 86,250.00
Kepala Tukang OH 0.075 115,000.00 8,625.00
Mandor OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 272,625.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) kg 61.000 1,250.00 76,250.00
Kapur m3 0.147 - -
Pasir Pasang m3 0.492 215,000.00 105,780.00
JUMLAH HARGA BAHAN 428,030.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 700,655.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 700,655.00
8 1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1/4 SP : 1KP : 4PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.500 205,000.00 307,500.00
Tukang Batu OH 0.750 112,000.00 84,000.00
Kepala Tukang OH 0.075 115,000.00 8,625.00
Mandor OH 0.075 115,000.00 8,625.00
JUMLAH TENAGA KERJA 408,750.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Semen portland (Gersik) kg 41.000 1,250.00 51,250.00
Kapur m3 0.131 - -
Pasir Pasang m3 0.523 18,000.00 9,414.00
JUMLAH HARGA BAHAN 306,664.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 715,414.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 715,414.00

9 1 M3 PASANGAN PONDASI SIKLOP, 60% BETON CAMPURAN 1 SP : 2 PB : 3 KR DAN 40% BATU BELAH
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.400 112,000.00 380,800.00
Tukang Batu OH 0.850 115,000.00 97,750.00
Kepala Tukang OH 0.085 115,000.00 9,775.00
Mandor OH 0.170 130,000.00 22,100.00
JUMLAH TENAGA KERJA 510,425.00
B. BAHAN
Batu Belah m3 0.480 205,000.00 98,400.00
Semen portland (Gersik) kg 194.000 1,250.00 242,500.00
Pasir Beton m3 0.312 195,000.00 60,840.00
Koral Beton m3 0.468 412,000.00 192,816.00
Besi Beton kg 126.000 9,800.00 1,234,800.00
Kawat Beton kg 1.800 32,000.00 57,600.00
JUMLAH HARGA BAHAN 1,886,956.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,397,381.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 2,397,381.00

10 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.400 112,000.00 268,800.00
Tukang Batu OH 0.800 115,000.00 92,000.00
Kepala Tukang OH 0.080 115,000.00 9,200.00
Mandor OH 0.119 130,000.00 15,470.00
JUMLAH TENAGA KERJA 385,470.00
B. BAHAN
Batu Belah m3 0.4500 205,000.00 92,250.00
Semen portland (Gersik) kg 194.0000 1,250.00 242,500.00
Pasir Beton m3 0.3120 195,000.00 60,840.00
Koral Beton m3 0.4680 412,000.00 192,816.00
JUMLAH HARGA BAHAN 588,406.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 973,876.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 973,876.00
11 1 M3 PASANGAN BATU KOSONG
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.780 112,000.00 87,360.00
Tukang Batu OH 0.390 115,000.00 44,850.00
Kepala Tukang OH 0.039 115,000.00 4,485.00
Mandor OH 0.039 130,000.00 5,070.00
JUMLAH TENAGA KERJA 141,765.00
B. BAHAN
Batu Belah m3 1.200 205,000.00 246,000.00
Pasir Urug m3 0.432 195,000.00 84,240.00
JUMLAH HARGA BAHAN 330,240.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 472,005.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 472,005.00

IV PEKERJAAN DINDING (PERMEN PUPR 28/PRT/M/2016))


1 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 - -
Semen kg 18.950 1,250.00 23,687.50
Pasir Pasang m3 0.038 215,000.00 8,170.00
JUMLAH HARGA BAHAN 31,857.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 80,057.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 80,057.50

2 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 - -
Semen kg 14.370 1,250.00 17,962.50
Pasir Pasang m3 0.040 215,000.00 8,600.00
JUMLAH HARGA BAHAN 26,562.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 74,762.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 74,762.50
3 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 - -
Semen kg 11.500 1,250.00 14,375.00
Pasir Pasang m3 0.043 215,000.00 9,245.00
JUMLAH HARGA BAHAN 23,620.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 71,820.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 71,820.00

4 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 - -
Semen kg 9.680 1,250.00 12,100.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
JUMLAH HARGA BAHAN 21,775.00
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 69,975.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 69,975.00

5 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 - -
Semen kg 8.320 1,250.00 10,400.00
Pasir Pasang m3 0.049 215,000.00 10,535.00
JUMLAH HARGA BAHAN 20,935.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 69,135.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 69,135.00
6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 - -
Semen kg 6.500 1,250.00 8,125.00
Pasir Pasang m3 0.050 215,000.00 10,750.00
JUMLAH HARGA BAHAN 18,875.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 67,075.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 67,075.00

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SP : 3 KP : 10 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 - -
Semen Portland (Gersik) kg 4.500 1,250.00 5,625.00
Kapur Padam m3 0.015 - -
Pasir Pasang m3 0.050 215,000.00 10,750.00
JUMLAH HARGA BAHAN 16,375.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 64,575.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 64,575.00

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SP : 3 KP : 10 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 - -
Semen Portland (Gersik) kg 4.500 1,250.00 5,625.00
Kapur Padam m3 0.015 - -
Pasir Pasang m3 0.050 215,000.00 10,750.00
JUMLAH HARGA BAHAN 16,375.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 64,575.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 64,575.00
9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 SM : 1 KP : 2 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 70.000 - -
Semen Merah kg 0.014 1,250.00 17.50
Kapur Padam m3 0.014 - -
Pasir Pasang m3 0.028 215,000.00 6,020.00
JUMLAH HARGA BAHAN 6,037.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 54,237.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 54,237.50

10 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 2 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,400.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 - -
Semen Portland (Gersik) kg 44.5 1,250.00 55,625.00
Pasir Pasang m3 0.08 215,000.00 17,200.00
JUMLAH HARGA BAHAN 72,825.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 169,225.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 169,225.00

11 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 3 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,400.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 - -
Semen Portland (Gersik) kg 32.950 1,250.00 41,187.50
Pasir Pasang m3 0.091 215,000.00 19,565.00
JUMLAH HARGA BAHAN 60,752.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 157,152.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 157,152.50
12 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 4 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,400.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 - -
Semen Portland (Gersik) kg 26.550 1,250.00 33,187.50
Pasir Pasang m3 0.093 215,000.00 19,995.00
JUMLAH HARGA BAHAN 53,182.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 149,582.50
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 149,582.50

13 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 5 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,400.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 - -
Semen Portland (Gersik) kg 22.200 1,250.00 27,750.00
Pasir Pasang m3 0.102 215,000.00 21,930.00
JUMLAH HARGA BAHAN 49,680.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 146,080.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 146,080.00

14 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 6 PP


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,400.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 - -
Semen Portland (Gersik) kg 18.500 1,250.00 23,125.00
Pasir Pasang m3 0.122 215,000.00 26,230.00
JUMLAH HARGA BAHAN 49,355.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 145,755.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 145,755.00
15 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 SP : 3 KP : 10 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.600 112,000.00 67,200.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 96,400.00
B. BAHAN
Bata Merah 5 x 11 x 22 cm bh 140.000 - -
Semen Portland (Gersik) kg 10.080 1,250.00 12,600.00
Kapur padam m3 0.0275 - -
Pasir Pasang m3 0.0925 215,000.00 19,887.50
JUMLAH HARGA BAHAN 32,487.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 128,887.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 128,887.50

16 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 20), campuran spesi 1 pc : 3 ps


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
HB-20 bh 12.5000 2,800.00 35,000.00
Semen Portland (Gersik) Kg 15.160 1,250.00 18,950.00
Pasir Pasang m3 0.3640 215,000.00 78,260.00
Besi Beton 8 mm kg 0.2800 9,800.00 2,744.00
JUMLAH HARGA BAHAN 134,954.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 183,154.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 183,154.00

17 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 20), campuran spesi 1 psp : 4 pp


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
HB-20 bh 12.5000 2,800.00 35,000.00
Semen Portland (Gersik) Kg 24.260 1,250.00 30,325.00
Pasir Pasang m3 0.7720 215,000.00 165,980.00
Besi Beton 8 mm kg 0.2800 9,800.00 2,744.00
JUMLAH HARGA BAHAN 234,049.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 282,249.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 282,249.00
18 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 15), campuran spesi 1 psp : 3 pp
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
HB-15 bh 22.7400 2,800.00 63,672.00
Semen Portland (Gersik) Kg 22.740 1,250.00 28,425.00
Pasir Pasang m3 0.550 215,000.00 118,250.00
Besi Beton 8 mm kg 0.2800 9,800.00 2,744.00
JUMLAH HARGA BAHAN 213,091.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 261,291.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 261,291.00

19 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 15), campuran spesi 1 psp : 4 pp


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Batu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
HB-15 bh 22.7400 2,800.00 63,672.00
Semen Portland (Gersik) Kg 18.200 1,250.00 22,750.00
Pasir Pasang m3 0.582 215,000.00 125,130.00
Besi Beton 8 mm kg 0.280 9,800.00 2,744.00
JUMLAH HARGA BAHAN 214,296.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 262,496.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 262,496.00

20 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 psp : 3 pp


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
HB-15 bh 12.5000 2,800.00 35,000.00
Semen Portland (Gersik) Kg 15.160 1,250.00 18,950.00
Pasir Pasang m3 0.364 215,000.00 78,260.00
Besi Beton 8 mm kg 0.280 9,800.00 2,744.00
JUMLAH HARGA BAHAN 134,954.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 183,154.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 183,154.00
21 1 M2 PASANGAN DINDING BATAKO / HOLLOWBLOCK (HB. 10), campuran spesi 1 psp : 4 pp
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
HB-15 bh 12.5000 2,800.00 35,000.00
Semen Portland (Gersik) Kg 15.160 1,250.00 18,950.00
Pasir Pasang m3 0.364 215,000.00 78,260.00
Besi Beton 8 mm kg 0.280 9,800.00 2,744.00
JUMLAH HARGA BAHAN 134,954.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 183,154.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 183,154.00

22 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 3 Ps


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata rooster bh 30.000 - -
Semen Portland (Gersik) kg 11.000 1,250.00 13,750.00
Pasir Pasang m3 0.035 215,000.00 7,525.00
JUMLAH HARGA BAHAN 21,275.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 69,475.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 69,475.00

23 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM camp 1 Pc : 4 Ps


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata roster bh 30.000 - -
Semen Portland (Gersik) kg 11.000 1,250.00 13,750.00
Pasir Pasang m3 0.035 215,000.00 7,525.00
JUMLAH HARGA BAHAN 21,275.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 69,475.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 69,475.00
24 1 M2 PASANGAN DINDING Bata Berongga Ekspose (12 x 11 x 24) CM camp 1 Pc : 3 PP
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Bata berongga bh 30.000 - -
Semen Portland (Gersik) kg 11.000 1,250.00 13,750.00
Pasir Pasang m3 0.035 215,000.00 7,525.00
JUMLAH HARGA BAHAN 21,275.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 69,475.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 69,475.00

25 1 M2 PASANGAN DINDING BATA RINGAN TEBAL 7.5 CM DENGAN MORTAR SIAP PAKAI
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.670 112,000.00 75,040.00
Tukang Batu OH 1.300 115,000.00 149,500.00
Kepala Tukang OH 0.13 115,000.00 14,950.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 239,880.00
B. BAHAN
Bata ringan tebal 7,5 cm bh 8.400 - -
Mortar siap pakai kg 0.473 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
Peralatan % 10
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 239,880.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 239,880.00

26 1 M2 PASANGAN DINDING BATA RINGAN TEBAL 10 CM DENGAN MORTAR SIAP PAKAI


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.670 112,000.00 75,040.00
Tukang Batu OH 1.300 115,000.00 149,500.00
Kepala Tukang OH 0.13 115,000.00 14,950.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 239,880.00
B. BAHAN
Bata ringan tebal 10 cm bh 8.400 - -
Mortar siap pakai kg 0.063 130,000.00 8,190.00
JUMLAH HARGA BAHAN 8,190.00
C. PERALATAN
Peralatan % 10
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 248,070.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 248,070.00
V PEKERJAAN PLESTERAN (PERMEN PUPR 28/PRT/M/2016)
1 1 M2 PLESTERAN CAMP. 1 PC : 1 PP TEBAL 15 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 115,000.00 1,725.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,525.00
B. BAHAN
Semen Portland (Gersik) kg 15.504 1,250.00 19,380.00
Pasir Pasang m3 0.016 215,000.00 3,440.00
JUMLAH HARGA BAHAN 22,820.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 77,345.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 77,345.00

2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 115,000.00 1,725.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,525.00
B. BAHAN
Semen Portland (Gersik) kg 10.224 1,250.00 12,780.00
Pasir Pasang m3 0.020 215,000.00 4,300.00
JUMLAH HARGA BAHAN 17,080.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 71,605.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 71,605.00

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 115,000.00 1,725.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,525.00
B. BAHAN
Semen Portland (Gersik) kg 7.776 1,250.00 9,720.00
Pasir Pasang m3 0.023 215,000.00 4,945.00
JUMLAH HARGA BAHAN 14,665.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 69,190.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 69,190.00
4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 115,000.00 1,725.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,525.00
B. BAHAN
Semen Portland (Gersik) kg 6.240 1,250.00 7,800.00
Pasir Pasang m3 0.024 215,000.00 5,160.00
JUMLAH HARGA BAHAN 12,960.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 67,485.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 67,485.00

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 115,000.00 1,725.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,525.00
B. BAHAN
Semen Portland (Gersik) kg 5.184 1,250.00 6,480.00
Pasir Pasang m3 0.026 215,000.00 5,590.00
JUMLAH HARGA BAHAN 12,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 66,595.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 66,595.00

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 115,000.00 1,725.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,525.00
B. BAHAN
Semen Portland (Gersik) kg 4.416 1,250.00 5,520.00
Pasir Pasang m3 0.027 215,000.00 5,805.00
JUMLAH HARGA BAHAN 11,325.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,850.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,850.00
7 1 M2 PLESTERAN CAMP. 1 PC : 7 PS TEBAL 15 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 115,000.00 1,725.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,525.00
B. BAHAN
Semen Portland (Gersik) kg 3.936 1,250.00 4,920.00
Pasir Pasang m3 0.028 215,000.00 6,020.00
JUMLAH HARGA BAHAN 10,940.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,465.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,465.00

8 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 115,000.00 1,725.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,525.00
B. BAHAN
Semen Portland (Gersik) kg 3.456 1,250.00 4,320.00
Pasir Pasang m3 0.029 215,000.00 6,235.00
JUMLAH HARGA BAHAN 10,555.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,080.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,080.00

9 1 M2 PLESTERAN CAMP. 1 PC : 2PP TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 112,000.00 44,800.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 72,960.00
B. BAHAN
Semen Portland (Gersik) Kg 13.632 1,250.00 17,040.00
Pasir Pasang m3 0.027 215,000.00 5,805.00
JUMLAH HARGA BAHAN 22,845.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 95,805.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 95,805.00
10 1 M2 PLESTERAN CAMP. 1 PC : 3PS TEBAL 20 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.260 112,000.00 29,120.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 56,110.00
B. BAHAN
Semen Portland (Gersik) kg 10.368 1,250.00 12,960.00
Pasir Pasang m3 0.031 215,000.00 6,665.00
JUMLAH HARGA BAHAN 19,625.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 75,735.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 75,735.00

11 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Batu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 71,790.00
B. BAHAN
Semen Portland (Gersik) kg 10.3680 1,250.00 12,960.00
Pasir Pasang m3 0.0310 215,000.00 6,665.00
JUMLAH HARGA BAHAN 19,625.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 91,415.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 91,415.00

12 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 112,000.00 44,800.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 72,960.00
B. BAHAN
Semen Portland (Gersik) kg 8.320 1,250.00 10,400.00
Pasir Pasang m3 0.032 215,000.00 6,880.00
JUMLAH HARGA BAHAN 17,280.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 90,240.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 90,240.00
13 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Batu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 72,960.00
B. BAHAN
Semen Portland (Gersik) kg 6.9120 1,250.00 8,640.00
Pasir Pasang m3 0.0350 215,000.00 7,525.00
JUMLAH HARGA BAHAN 16,165.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 89,125.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 89,125.00

14 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Batu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 72,960.00
B. BAHAN
Semen Portland (Gersik) kg 5.8880 1,250.00 7,360.00
Pasir Pasang m3 0.0360 215,000.00 7,740.00
JUMLAH HARGA BAHAN 15,100.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,060.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,060.00

15 1 M2 PLESTERAN CAMP. 1 PC : 1 KP : 2 PS TEBAL 20 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Batu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0220 130,000.00 2,860.00
JUMLAH TENAGA KERJA 72,960.00
B. BAHAN
Semen Portland (Gersik) kg 5.8880 1,250.00 7,360.00
Pasir Pasang m3 0.0360 215,000.00 7,740.00
JUMLAH HARGA BAHAN 15,100.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 88,060.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 88,060.00
16 1 M2 PLESTERAN BERAPEN 1 PS : 5PP TEBAL 15 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.150 112,000.00 16,800.00
Tukang Batu OH 0.075 115,000.00 8,625.00
Kepala Tukang OH 0.008 115,000.00 920.00
Mandor OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 27,385.00
B. BAHAN
Semen Portland (Gersik) kg 5.184 1,250.00 6,480.00
Pasir Pasang m3 0.026 215,000.00 5,590.00
JUMLAH HARGA BAHAN 12,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 39,455.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 39,455.00

17 1 M' PLESTERAN SKONING 1 PC : 3 PS, TEBAL 10 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.080 112,000.00 8,960.00
Tukang Batu OH 0.400 115,000.00 46,000.00
Kepala Tukang OH 0.040 115,000.00 4,600.00
Mandor OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 60,080.00
B. BAHAN
Semen Portland (Gersik) kg 0.500 1,250.00 625.00
Pasir Pasang m3 0.013 215,000.00 2,795.00
JUMLAH HARGA BAHAN 3,420.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 63,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 63,500.00

18 1 M2 PLESTERAN GRANIT 1 SP : 2 GRANIT TEBAL 1 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.450 112,000.00 50,400.00
Tukang Batu OH 0.225 115,000.00 25,875.00
Kepala Tukang OH 0.023 115,000.00 2,645.00
Mandor OH 0.023 130,000.00 2,990.00
JUMLAH TENAGA KERJA 81,910.00
B. BAHAN
Semen Portland (Gersik) Kg 10.000 1,250.00 12,500.00
Batu Granit Kg 15.000 215,000.00 3,225,000.00
JUMLAH HARGA BAHAN 3,237,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 3,319,410.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 3,319,410.00
19 1 M2 PLESTERAN TRASO 1 SP : 2 TRASO TEBAL 1 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.450 112,000.00 50,400.00
Tukang Batu OH 0.225 115,000.00 25,875.00
Kepala Tukang OH 0.023 115,000.00 2,645.00
Mandor OH 0.023 130,000.00 2,990.00
JUMLAH TENAGA KERJA 81,910.00
B. BAHAN
Semen Portland (Gersik) Kg 10.000 1,250.00 12,500.00
Batu Granit Kg 15.000 215,000.00 3,225,000.00
JUMLAH HARGA BAHAN 3,237,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 3,319,410.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 3,319,410.00

20 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 48,200.00
B. BAHAN
Semen Portland (Gersik) kg 4.320 1,250.00 5,400.00
Pasir Pasang m3 0.006 215,000.00 1,290.00
JUMLAH HARGA BAHAN 6,690.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 54,890.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 54,890.00

21 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.150 112,000.00 16,800.00
Tukang Batu OH 0.075 115,000.00 8,625.00
Kepala Tukang OH 0.008 115,000.00 920.00
Mandor OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 27,385.00
B. BAHAN
Semen Portland (Gersik) kg 3.108 1,250.00 3,885.00
JUMLAH HARGA BAHAN 3,885.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 31,270.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 31,270.00
22 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.070 112,000.00 7,840.00
Tukang Batu OH 0.035 115,000.00 4,025.00
Kepala Tukang OH 0.004 115,000.00 460.00
Mandor OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 12,845.00
B. BAHAN
Semen Portland (Gersik) kg 1.600 1,250.00 2,000.00
JUMLAH HARGA BAHAN 2,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 14,845.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 14,845.00

23 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.300 112,000.00 33,600.00
Tukang Batu OH 0.150 115,000.00 17,250.00
Kepala Tukang OH 0.015 115,000.00 1,725.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 54,525.00
B. BAHAN
Semen Portland (Gersik) kg 6.340 1,250.00 7,925.00
Pasir Pasang m3 0.012 215,000.00 2,580.00
JUMLAH HARGA BAHAN 10,505.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,030.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,030.00

24 1 M2 PLESTERAN MENGGUNAKAN SEMEN MU - 301, TEBAL 10 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 112,000.00 44,800.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 72,960.00
B. BAHAN
Semen MU-301 kg 2.00 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 72,960.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 72,960.00
25 1 M2 ACIAN MENGGUNAKAN SEMEN MU - 200,TEBAL 1,5MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 112,000.00 44,800.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 72,960.00
B. BAHAN
Semen MU-200 kg 3.500 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 72,960.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 72,960.00

26 1 M2 PEKERJAAN ACIAN
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.200 112,000.00 22,400.00
Tukang Batu OH 0.100 115,000.00 11,500.00
Kepala Tukang OH 0.01 115,000.00 1,150.00
Mandor OH 0.01 130,000.00 1,300.00
JUMLAH TENAGA KERJA 36,350.00
B. BAHAN
Semen Portland (Gersik) kg 3.25 1,250.00 4,062.50
JUMLAH HARGA BAHAN 4,062.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 40,412.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 40,412.50

VI PEKERJAAN KAYU (PERMEN PUPR 28/PRT/M/2016)


1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 7.0000 112,000.00 784,000.00
Tukang kayu OH 21.0000 115,000.00 2,415,000.00
Kepala Tukang OH 2.1000 115,000.00 241,500.00
Mandor OH 0.3500 130,000.00 45,500.00
JUMLAH TENAGA KERJA 3,486,000.00
B. BAHAN
Balok Kayu Jati m3 1.1000 9,500,000.00 10,450,000.00
Paku 10 Cm Kg 1.2500 18,000.00 22,500.00
Lem Kayu Kg 1.0000 16,000.00 16,000.00
JUMLAH HARGA BAHAN 10,488,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 13,974,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 13,974,500.00
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS III
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 6.0000 112,000.00 672,000.00
Tukang kayu OH 18.0000 115,000.00 2,070,000.00
Kepala Tukang OH 1.8000 115,000.00 207,000.00
Mandor OH 0.3000 130,000.00 39,000.00
JUMLAH TENAGA KERJA 2,988,000.00
B. BAHAN
Balok Kayu Kruing m3 1.2000 - -
Paku 10 Cm Kg 1.2500 18,000.00 22,500.00
Lem Kayu Kg 1.0000 16,000.00 16,000.00
JUMLAH HARGA BAHAN 38,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 3,026,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 3,026,500.00

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3500 112,000.00 39,200.00
Tukang kayu OH 1.0500 115,000.00 120,750.00
Kepala Tukang OH 0.1050 115,000.00 12,075.00
Mandor OH 0.0180 130,000.00 2,340.00
JUMLAH TENAGA KERJA 174,365.00
B. BAHAN
Papan Kayu Kamper m3 0.0400 9,500,000.00 380,000.00
Paku 5-7 Cm Kg 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 380,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 555,265.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 555,265.00

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3500 112,000.00 39,200.00
Tukang kayu OH 1.0500 115,000.00 120,750.00
Kepala Tukang OH 0.1050 115,000.00 12,075.00
Mandor OH 0.0180 130,000.00 2,340.00
JUMLAH TENAGA KERJA 174,365.00
B. BAHAN
Papan Kayu Kruing m3 0.0400 - -
Paku 5-7 Cm Kg 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 175,265.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 175,265.00
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS II
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 112,000.00 112,000.00
Tukang kayu OH 3.0000 115,000.00 345,000.00
Kepala Tukang OH 0.3000 115,000.00 34,500.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 498,000.00
B. BAHAN
Papan Kayu Kamper m3 0.0400 9,500,000.00 380,000.00
Lem Kayu Kg 0.5000 16,000.00 8,000.00
JUMLAH HARGA BAHAN 388,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 886,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 886,000.00

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 112,000.00 89,600.00
Tukang kayu OH 2.4000 115,000.00 276,000.00
Kepala Tukang OH 0.2400 115,000.00 27,600.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 398,400.00
B. BAHAN
Papan Kayu Kamper m3 0.0240 9,500,000.00 228,000.00
Lem Kayu Kg 0.3000 16,000.00 4,800.00
JUMLAH HARGA BAHAN 232,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 631,200.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 631,200.00

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 112,000.00 112,000.00
Tukang kayu OH 3.0000 115,000.00 345,000.00
Kepala Tukang OH 0.3000 115,000.00 34,500.00
Mandor OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 498,000.00
B. BAHAN
Papan Kayu Kamper m3 0.0640 9,500,000.00 608,000.00
Lem Kayu Kg 0.5000 16,000.00 8,000.00
JUMLAH HARGA BAHAN 616,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,114,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,114,000.00
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 112,000.00 78,400.00
Tukang kayu OH 2.1000 115,000.00 241,500.00
Kepala Tukang OH 0.2100 115,000.00 24,150.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 348,600.00
B. BAHAN
Papan Kayu Kamper m3 0.0250 9,500,000.00 237,500.00
Paku 1-2,5 Cm Kg 0.0300 18,000.00 540.00
Lem Kayu Kg 0.5000 16,000.00 8,000.00
Plywood 4 mm Lbr 1.0000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 426,040.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 774,640.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 774,640.00

9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 112,000.00 89,600.00
Tukang kayu OH 2.4000 115,000.00 276,000.00
Kepala Tukang OH 0.2400 115,000.00 27,600.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 398,400.00
B. BAHAN
Papan Kayu Kamper m3 0.0256 9,500,000.00 243,200.00
Paku 1-2,5 Cm Kg 0.0300 18,000.00 540.00
Lem Kayu Kg 0.5000 16,000.00 8,000.00
Plywood 4 mm Lbr 1.0000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 431,740.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 830,140.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 830,140.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6700 112,000.00 75,040.00
Tukang kayu OH 2.0000 115,000.00 230,000.00
Kepala Tukang OH 0.2000 115,000.00 23,000.00
Mandor OH 0.3350 130,000.00 43,550.00
JUMLAH TENAGA KERJA 371,590.00
B. BAHAN
Papan Kayu Kamper m3 0.0600 9,500,000.00 570,000.00
Paku 1-2,5 Cm Kg 0.1500 18,000.00 2,700.00
JUMLAH HARGA BAHAN 572,700.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 944,290.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 944,290.00
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 112,000.00 89,600.00
Tukang kayu OH 2.4000 115,000.00 276,000.00
Kepala Tukang OH 0.2400 115,000.00 27,600.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 398,400.00
B. BAHAN
Papan Kayu Jati m3 0.0250 - -
Paku 1-2,5 Cm Kg 0.0300 18,000.00 540.00
Lem Kayu Kg 0.3000 16,000.00 4,800.00
Teakwood 4 mm uk 90x220 cm Lbr 1.0000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 185,340.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 583,740.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 583,740.00

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8500 112,000.00 95,200.00
Tukang kayu OH 2.5500 115,000.00 293,250.00
Kepala Tukang OH 0.2550 115,000.00 29,325.00
Mandor OH 0.0430 130,000.00 5,590.00
JUMLAH TENAGA KERJA 423,365.00
B. BAHAN
Papan Kayu Kamper m3 0.0250 9,500,000.00 237,500.00
Paku 1-2,5 Cm Kg 0.0300 18,000.00 540.00
Lem Kayu Kg 0.8000 16,000.00 12,800.00
Teakwood 4 mm uk 90x220 cm Lbr 1.0000 - -
Formika Lbr 0.5000 - -
JUMLAH HARGA BAHAN 250,840.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 674,205.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 674,205.00

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS II Bentang 6 M'


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 4.0000 112,000.00 448,000.00
Tukang kayu OH 12.0000 115,000.00 1,380,000.00
Kepala Tukang OH 1.2000 115,000.00 138,000.00
Mandor OH 0.2000 130,000.00 26,000.00
JUMLAH TENAGA KERJA 1,992,000.00
B. BAHAN
Balok Kayu Kamper m3 1.1000 - -
Besi Strip Tebal 5 cm Kg 15.0000 - -
Paku 12 Cm Kg 5.6000 18,000.00 100,800.00
JUMLAH HARGA BAHAN 100,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 2,092,800.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 2,092,800.00
14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 6.7000 112,000.00 750,400.00
Tukang kayu OH 20.1000 115,000.00 2,311,500.00
Kepala Tukang OH 2.0100 115,000.00 231,150.00
Mandor OH 0.3350 130,000.00 43,550.00
JUMLAH TENAGA KERJA 3,336,600.00
B. BAHAN
Balok Kayu Jati m3 1.2000 9,500,000.00 11,400,000.00
Besi Strip Tebal 5 cm Kg 15.0000 - -
Paku 12 Cm Kg 5.6000 18,000.00 100,800.00
JUMLAH HARGA BAHAN 11,500,800.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 14,837,400.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 14,837,400.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.4000 112,000.00 268,800.00
Tukang kayu OH 7.2000 115,000.00 828,000.00
Kepala Tukang OH 0.7200 115,000.00 82,800.00
Mandor OH 0.1200 130,000.00 15,600.00
JUMLAH TENAGA KERJA 1,195,200.00
B. BAHAN
Balok Kayu Jati m3 1.1000 9,500,000.00 10,450,000.00
Besi Strip Tebal 5 cm Kg 15.0000 - -
Paku 12 Cm Kg 3.0000 18,000.00 54,000.00
JUMLAH HARGA BAHAN 10,504,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 11,699,200.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 11,699,200.00

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 24,500.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0140 - -
Reng ( 2 x 3 ) Cm m3 0.0036 - -
Paku 5 Cm dan 10 Cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 4,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 29,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 29,000.00
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 24,500.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0140 - -
Reng ( 2 x 3 ) Cm Kg 0.0072 - -
Paku 5 Cm dan 10 Cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 4,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 29,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 29,000.00

18 MEMASANG 1 M2 USUK EXPOSE KAYU KLS I KAMPER


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 24,500.00
B. BAHAN
Usuk ( 5 x 7 ) Cm m3 0.0105 - -
Paku 5 Cm dan 10 Cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 4,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 29,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 29,000.00

19 MEMASANG 1 M2 RENG KAYU KLS I KAMPER


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 24,500.00
B. BAHAN
Reng ( 2 x 3 ) Cm m3 0.0036 - -
Paku 5 Cm dan 10 Cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 4,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 29,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 29,000.00
20 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1200 112,000.00 13,440.00
Tukang kayu OH 0.1200 115,000.00 13,800.00
Kepala Tukang OH 0.0120 115,000.00 1,380.00
Mandor OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 29,400.00
B. BAHAN
Balok Kayu Kamper m3 0.1650 - -
Paku 5 Cm dan 10 Cm Kg 0.2000 18,000.00 3,600.00
JUMLAH HARGA BAHAN 3,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 33,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 33,000.00

21 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang kayu OH 0.3000 115,000.00 34,500.00
Kepala Tukang OH 0.0300 115,000.00 3,450.00
Mandor OH 0.0750 130,000.00 9,750.00
JUMLAH TENAGA KERJA 64,500.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0154 - -
Paku 7 Cm dan 10 Cm Kg 0.2000 18,000.00 3,600.00
JUMLAH HARGA BAHAN 3,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 68,100.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 68,100.00

22 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang kayu OH 0.3000 115,000.00 34,500.00
Kepala Tukang OH 0.0300 115,000.00 3,450.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 61,650.00
B. BAHAN
Kaso-Kaso ( 5 x 7 ) Cm m3 0.0163 - -
Paku 7 Cm dan 10 Cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 4,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 66,150.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 66,150.00
23 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS II
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 37,150.00
B. BAHAN
Papan Kayu Kamper m3 0.0108 1,700,000.00 18,360.00
Paku 7 Cm dan 10 Cm Kg 0.1000 18,000.00 1,800.00
JUMLAH HARGA BAHAN 20,160.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 57,310.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 57,310.00

24 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang kayu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 37,150.00
B. BAHAN
Papan Kayu Kamper m3 0.0110 1,700,000.00 18,700.00
Paku 7 Cm dan 10 Cm Kg 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 19,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 56,750.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 56,750.00

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang kayu OH 0.4500 115,000.00 51,750.00
Kepala Tukang OH 0.0450 115,000.00 5,175.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 74,765.00
B. BAHAN
Balok Kayu Kamper m3 0.0280 - -
Paku 5 Cm dan 7 Cm Kg 0.1500 18,000.00 2,700.00
JUMLAH HARGA BAHAN 2,700.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 77,465.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 77,465.00
26 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang kayu OH 0.4500 115,000.00 51,750.00
Kepala Tukang OH 0.0450 115,000.00 5,175.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 74,765.00
B. BAHAN
Balok Kayu Kamper m3 0.0280 - -
Paku 5 Cm dan 7 Cm Kg 0.1500 18,000.00 2,700.00
Teakwood 4 mm uk 90x220 cm Lbr 0.8600 - -
Lem Kayu Kg 0.5600 16,000.00 8,960.00
JUMLAH HARGA BAHAN 11,660.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 86,425.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 86,425.00

27 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang kayu OH 0.6000 115,000.00 69,000.00
Kepala Tukang OH 0.0600 115,000.00 6,900.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 99,600.00
B. BAHAN
Balok Kayu Kamper m3 0.0280 - -
Paku 5 Cm dan 7 Cm Kg 0.1500 18,000.00 2,700.00
Plywood tebal 4 mm uk 120 x 240 cm Lbr 0.8600 - -
Lem Kayu Kg 0.5600 16,000.00 8,960.00
JUMLAH HARGA BAHAN 11,660.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 111,260.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 111,260.00

28 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA HOLO


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang kayu OH 0.4500 115,000.00 51,750.00
Kepala Tukang OH 0.0450 115,000.00 5,175.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 74,765.00
B. BAHAN
Rangka Holo Btg 1.5000 -
Paku 5 Cm dan 7 Cm Kg 0.1500 18,000.00 2,700.00
Teakwood 4 mm uk 90x220 cm Lbr 0.8600 - -
Lem Kayu Kg 0.5600 16,000.00 8,960.00
JUMLAH HARGA BAHAN 11,660.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 86,425.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 86,425.00
29 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA HOLO
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang kayu OH 0.6000 115,000.00 69,000.00
Kepala Tukang OH 0.0600 115,000.00 6,900.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 99,600.00
B. BAHAN
Rangka Holo Btg 1.5000 38,500.00 57,750.00
Paku 5 Cm dan 7 Cm Kg 0.1500 18,000.00 2,700.00
Plywood tebal 4 mm uk 120 x 240 cm Lbr 0.8600 180,000.00 154,800.00
Lem Kayu Kg 0.5600 16,000.00 8,960.00
JUMLAH HARGA BAHAN 224,210.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 323,810.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 323,810.00

30 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6000 112,000.00 67,200.00
Tukang kayu OH 1.8000 115,000.00 207,000.00
Kepala Tukang OH 0.1800 115,000.00 20,700.00
Mandor OH 0.0300 130,000.00 3,900.00
JUMLAH TENAGA KERJA 298,800.00
B. BAHAN
Papan Kayu Kamper m3 0.0070 1,700,000.00 11,900.00
Paku 5 Cm dan 10 Cm Kg 0.1000 18,000.00 1,800.00
Paku Skrup 10 cm Kg 0.1500 550.00 82.50
JUMLAH HARGA BAHAN 13,782.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 312,582.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 312,582.50

31 MEMASANG 1 M2 LAMBRIZIRING DARI CONWOOD UKURAN (100 x 3050 x 11 mm)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0250 112,000.00 2,800.00
Tukang kayu OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 12,475.00
B. BAHAN
#REF! m3 4.0000 - -
Paku 1 Cm dan 2.5 Cm Kg 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 13,375.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 13,375.00
32 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0250 112,000.00 2,800.00
Tukang kayu OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 12,475.00
B. BAHAN
Plywood tebal 4 mm uk 120 x 240 cm Lbr 0.4000 180,000.00 72,000.00
Paku 1 Cm dan 2.5 Cm Kg 0.0500 18,000.00 900.00
JUMLAH HARGA BAHAN 72,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 85,375.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 85,375.00

VII PEKERJAAN BETON ( PERMEN PUPR 28/PRT/M/2016))


1 MEMBUAT 1 M³ BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 ± 2)cm, w/c = 0,87
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 115,000.00 3,220.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,435.00
B. BAHAN
Semen Portland (Gersik) kg 247.000 1,250.00 308,750.00
Pasir Beton kg 869 139.29 121,039.29
Koral Beton kg 999 305.19 304,880.00
Air Liter 215 - -
JUMLAH HARGA BAHAN 734,669.29
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 965,104.29
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 965,104.29

2 MEMBUAT 1 M³ BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 ± 2)cm, w/c = 0,78
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 115,000.00 3,220.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,435.00
B. BAHAN
Semen Portland (Gersik) kg 276.000 1,250.00 345,000.00
Pasir Beton kg 828 139.29 115,328.57
Koral Beton kg 1,012 305.19 308,847.41
Air lt 215 - -
JUMLAH HARGA BAHAN 769,175.98
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 999,610.98
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 999,610.98
3 MEMBUAT 1 M³ BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 ± 2)cm, w/c = 0,72
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.6500 112,000.00 184,800.00
Tukang Batu OH 0.2750 115,000.00 31,625.00
Kepala Tukang OH 0.0280 115,000.00 3,220.00
Mandor OH 0.0830 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,435.00
B. BAHAN
Semen Portland (Gersik) kg 299.0000 1,250.00 373,750.00
Pasir Beton kg 799 139.29 111,289.29
Koral Beton kg 1,017 305.19 310,373.33
Air lt 215 - -
JUMLAH HARGA BAHAN 795,412.62
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,025,847.62
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,025,847.62

4 MEMBUAT 1 M³ LANTAI KERJA BETON MUTU F'C = 7,4 MPA SLUMP (3-6)CM, W/C =0.87
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.200 112,000.00 134,400.00
Tukang Batu OH 0.200 115,000.00 23,000.00
Kepala Tukang OH 0.020 115,000.00 2,300.00
Mandor OH 0.060 130,000.00 7,800.00
JUMLAH TENAGA KERJA 167,500.00
B. BAHAN
Semen Portland (Gersik) kg 230.0000 1,250.00 287,500.00
Pasir Beton kg 893 139.29 124,382.14
Koral Beton kg 1,027 305.19 313,425.19
Air lt 200 - -
JUMLAH HARGA BAHAN 725,307.33
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 892,807.33
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 892,807.33

5 MEMBUAT 1 M³ BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 115,000.00 3,220.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,435.00
B. BAHAN
Semen Portland (Gersik) kg 326.0000 1,250.00 407,500.00
Pasir Beton kg 760 139.29 105,857.14
Koral Beton kg 1,029 305.19 314,035.56
Air liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 848,892.70
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,079,327.70
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,079,327.70
6 MEMBUAT 1 M³ BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 115,000.00 3,220.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,435.00
B. BAHAN
Semen Portland (Gersik) kg 352.0000 1,250.00 440,000.00
Pasir Beton kg 731 139.29 101,817.86
Koral Beton kg 1,031 305.19 314,645.93
Air liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 877,963.78
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,108,398.78
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,108,398.78

7 MEMBUAT 1 M³ BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 ± 2)cm, w/c = 0,58
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 115,000.00 3,220.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,435.00
B. BAHAN
Semen Portland (Gersik) kg 371.000 1,250.00 463,750.00
Pasir Beton kg 698 139.29 97,221.43
Koral Beton kg 1,047 305.19 319,528.89
Air lietr 215 100.00 21,500.00
JUMLAH HARGA BAHAN 902,000.32
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,132,435.32
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,132,435.32

8 MEMBUAT 1 M³ BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 ± 2)cm, w/c =0,56
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 115,000.00 3,220.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,435.00
B. BAHAN
Semen Portland (Gersik) kg 384.000 1,250.00 480,000.00
Pasir Beton kg 692 139.29 96,385.71
Koral Beton kg 1,039 305.19 317,087.41
Air liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 914,973.12
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,145,408.12
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,145,408.12
9 MEMBUAT 1 M³ BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 ± 2)cm, w/c =0,53
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 115,000.00 3,220.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,435.00
B. BAHAN
Semen Portland (Gersik) kg 406.000 1,250.00 507,500.00
Pasir Beton kg 684 139.29 95,271.43
Koral Beton kg 1,026 305.19 313,120.00
Air Liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 937,391.43
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,167,826.43
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,167,826.43
10 MEMBUAT 1 M³ BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 ± 2)cm, w/c =0,52
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.650 112,000.00 184,800.00
Tukang Batu OH 0.275 115,000.00 31,625.00
Kepala Tukang OH 0.028 115,000.00 3,220.00
Mandor OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 230,435.00
B. BAHAN
Semen Portland (Gersik) kg 413.000 1,250.00 516,250.00
Pasir Beton kg 681 139.29 94,853.57
Koral Beton kg 1,021 305.19 311,594.07
Air liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 944,197.65
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,174,632.65
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,174,632.65

11 MEMBUAT 1 M³ BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 ± 2)cm, w/c =0,49
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.100 112,000.00 235,200.00
Tukang Batu OH 0.350 115,000.00 40,250.00
Kepala Tukang OH 0.035 115,000.00 4,025.00
Mandor OH 0.105 130,000.00 13,650.00
JUMLAH TENAGA KERJA 293,125.00
B. BAHAN
Semen Portland (Gersik) kg 439.0000 1,250.00 548,750.00
Pasir Beton kg 670 139.29 93,321.43
Koral Beton kg 1,006 305.19 307,016.30
Air lt 215 100.00 21,500.00
JUMLAH HARGA BAHAN 970,587.72
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,263,712.72
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,263,712.72

12 MEMBUAT 1 M³ BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 ± 2)cm, w/c =0,48
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 2.100 112,000.00 235,200.00
Tukang Batu OH 0.350 115,000.00 40,250.00
Kepala Tukang OH 0.035 115,000.00 4,025.00
Mandor OH 0.105 130,000.00 13,650.00
JUMLAH TENAGA KERJA 293,125.00
B. BAHAN
Semen Portland (Gersik) kg 448.0000 1,250.00 560,000.00
Pasir Beton kg 667 139.29 92,903.57
Koral Beton kg 1,000 305.19 305,185.19
Air liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 979,588.76
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 1,272,713.76
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 1,272,713.76
13 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.070 112,000.00 7,840.00
Tukang Besi OH 0.070 115,000.00 8,050.00
Kepala Tukang OH 0.007 115,000.00 805.00
Mandor OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 17,215.00
B. BAHAN
Besi Beton (Polos/ Ulir) kg 10.500 9,800.00 102,900.00
Kawat Beton kg 0.150 32,000.00 4,800.00
JUMLAH HARGA BAHAN 107,700.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 124,915.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 124,915.00
Harga Satuan Pekerjaan untuk 1 Kg 12,491.50

14 PEMBESIAN 10 KG kabel prategang (prestressed) polos/strands


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.050 112,000.00 5,600.00
Tukang Besi OH 0.050 115,000.00 5,750.00
Kepala Tukang OH 0.005 115,000.00 575.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 12,315.00
B. BAHAN
Besi Beton (Polos/ Ulir) kg 10.500 9,800.00 102,900.00
Kawat Beton kg 0.100 32,000.00 3,200.00
JUMLAH HARGA BAHAN 106,100.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 118,415.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 118,415.00
Harga Satuan Pekerjaan untuk 1 Kg 11,841.50

15 PEMBESIAN 10 KG DENGAN BESI POLOS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0700 112,000.00 7,840.00
Tukang Besi OH 0.0700 115,000.00 8,050.00
Kepala Tukang OH 0.0070 115,000.00 805.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 17,215.00
B. BAHAN
Besi Beton (Polos/ Ulir) kg 10.5000 816.67 8,575.00
Kawat Beton m3 0.1500 32,000.00 4,800.00
JUMLAH HARGA BAHAN 13,375.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 30,590.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 30,590.00
Harga Satuan Pekerjaan untuk 1 Kg 3,059.00
16 Pemasangan 10 Kg jaring kawat baja (wiremesh)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.025 112,000.00 2,800.00
Tukang Besi OH 0.025 115,000.00 2,875.00
Kepala Tukang OH 0.025 115,000.00 2,875.00
Mandor OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 8,680.00
B. BAHAN
Jaring kawat baja dilas kg 10.200 - -
Kawat Beton kg 0.0500 32,000.00 1,600.00
JUMLAH HARGA BAHAN 1,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 10,280.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 10,280.00

17 1 M2 PASANG BEKISTING UNTUK PONDASI


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.520 112,000.00 58,240.00
Tukang Kayu OH 0.260 115,000.00 29,900.00
Kepala Tukang OH 0.026 115,000.00 2,990.00
Mandor OH 0.026 130,000.00 3,380.00
JUMLAH TENAGA KERJA 94,510.00
B. BAHAN
Kayu Kelas III m3 0.040 2,000,000.00 80,000.00
Paku Biasa 5 - 10 cm kg 0.300 18,000.00 5,400.00
Minyak Bekisting ltr 0.100 45,000.00 4,500.00
JUMLAH HARGA BAHAN 89,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 184,410.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 184,410.00

18 1 M2 PASANG BEKISTING UNTUK SLOOF


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5200 112,000.00 58,240.00
Tukang Kayu OH 0.2600 115,000.00 29,900.00
Kepala Tukang OH 0.0260 115,000.00 2,990.00
Mandor OH 0.0260 130,000.00 3,380.00
JUMLAH TENAGA KERJA 94,510.00
B. BAHAN
Kayu Kelas III m3 0.045 2,000,000.00 90,000.00
Paku Biasa 5cm - 10cm kg 0.300 18,000.00 5,400.00
Minyak Bekisting ltr 0.100 45,000.00 4,500.00
JUMLAH HARGA BAHAN 99,900.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 194,410.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 194,410.00
19 1 M2 PASANG BEKISTING UNTUK KOLOM
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.660 112,000.00 73,920.00
Tukang Kayu OH 0.330 115,000.00 37,950.00
Kepala Tukang OH 0.033 115,000.00 3,795.00
Mandor OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 119,955.00
B. BAHAN
Kayu Kelas III m3 0.040 2,000,000.00 80,000.00
Paku Biasa 5cm - 12cm kg 0.400 18,000.00 7,200.00
Minyak Bekisting ltr 0.200 45,000.00 9,000.00
Balok kayu kelas II m3 0.015 4,150,000.00 62,250.00
Plywood tebal 9 mm lbr 0.350 112,500.00 39,375.00
Dolken Kayu 8 - 10 cm /4 m Batang 2.000 8,000.00 16,000.00
JUMLAH HARGA BAHAN 213,825.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 333,780.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 333,780.00

20 1 M2 PASANG BEKISTING UNTUK BALOK


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.660 112,000.00 73,920.00
Tukang Kayu OH 0.330 115,000.00 37,950.00
Kepala Tukang OH 0.033 115,000.00 3,795.00
Mandor OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 119,955.00
B. BAHAN
Kayu Kelas III m3 0.040 2,000,000.00 80,000.00
Paku Biasa 5 cm - 12 cm kg 0.400 18,000.00 7,200.00
Minyak Bekisting ltr 0.200 45,000.00 9,000.00
Balok kayu kelas II m3 0.018 4,150,000.00 74,700.00
Plywood tebal 9 mm lbr 0.350 112,500.00 39,375.00
Dolken Kayu Ø (8 - 10)cm /4 m btg 2.000 8,000.00 16,000.00
JUMLAH HARGA BAHAN 226,275.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 346,230.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 346,230.00
21 1 M2 PASANG BEKISTING UNTUK PLAT LANTAI
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.660 112,000.00 73,920.00
Tukang Kayu OH 0.330 115,000.00 37,950.00
Kepala Tukang OH 0.033 115,000.00 3,795.00
Mandor OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 119,955.00
B. BAHAN
Kayu Kelas III m3 0.040 2,000,000.00 80,000.00
Paku Biasa 5cm - 12cm kg 0.400 18,000.00 7,200.00
Minyak Bekisting ltr 0.200 45,000.00 9,000.00
Balok kayu kelas II m3 0.015 4,150,000.00 62,250.00
Plywood tebal 9 mm lbr 0.350 112,500.00 39,375.00
Dolken Kayu Ø( 8 - 10) cm /4 m btg 6.000 8,000.00 48,000.00
JUMLAH HARGA BAHAN 245,825.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 365,780.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 365,780.00

22 1 M2 PASANG BEKISTING UNTUK DINDING


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6600 112,000.00 73,920.00
Tukang Kayu OH 0.3300 115,000.00 37,950.00
Kepala Tukang OH 0.0330 115,000.00 3,795.00
Mandor OH 0.0330 130,000.00 4,290.00
JUMLAH TENAGA KERJA 119,955.00
B. BAHAN
Kayu Kelas III m3 0.030 2,000,000.00 60,000.00
Paku Biasa 5cm - 12 cm kg 0.400 18,000.00 7,200.00
Minyak Bekisting ltr 0.200 45,000.00 9,000.00
Balok kayu kelas II m3 0.020 4,150,000.00 83,000.00
Plywood tebal 9 mm lbr 0.350 112,500.00 39,375.00
Dolken Kayu Ø ( 8 - 10)cm/4 m btg 3.000 8,000.00 24,000.00
Formite/penjaga jarak bekisting/spacer Bh 4.000 - -
JUMLAH HARGA BAHAN 222,575.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 342,530.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 342,530.00
23 1 M2 PASANG BEKISTING UNTUK TANGGA
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6600 112,000.00 73,920.00
Tukang Kayu OH 0.3300 115,000.00 37,950.00
Kepala Tukang OH 0.0330 115,000.00 3,795.00
Mandor OH 0.0330 130,000.00 4,290.00
JUMLAH TENAGA KERJA 119,955.00
B. BAHAN
Kayu Kelas III m3 0.030 2,000,000.00 60,000.00
Paku Biasa 5cm - 12 cm kg 0.400 18,000.00 7,200.00
Minyak Bekisting ltr 0.150 45,000.00 6,750.00
Balok kayu kelas II m3 0.015 4,150,000.00 62,250.00
Plywood tebal 9 mm lbr 0.350 112,500.00 39,375.00
Dolken Kayu Ø (8 - 10)cm /4 m btg 2.000 8,000.00 16,000.00
JUMLAH HARGA BAHAN 191,575.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 311,530.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 311,530.00

24 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.150 112,000.00 16,800.00
Tukang Kayu OH 0.050 115,000.00 5,750.00
Kepala Tukang OH 0.005 115,000.00 575.00
Mandor OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 24,165.00
B. BAHAN
Kayu Kelas III (papan) m3 0.0264 2,000,000.00 52,800.00
Paku Biasa 5 cm - 12 cm kg 0.600 18,000.00 10,800.00
Dolken Kayu Ø (8 - 10) cm /4 m btg 0.500 8,000.00 4,000.00
JUMLAH HARGA BAHAN 67,600.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 91,765.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 91,765.00
25 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.180 112,000.00 20,160.00
Tukang Batu OH 0.020 115,000.00 2,300.00
Tukang Kayu OH 0.020 115,000.00 2,300.00
Tukang Besi OH 0.020 115,000.00 2,300.00
Kepala Tukang OH 0.006 115,000.00 690.00
Mandor OH 0.009 130,000.00 1,170.00
JUMLAH TENAGA KERJA 28,920.00
B. BAHAN
Kayu Kelas III m3 0.002 2,000,000.00 4,000.00
Paku Biasa 5cm - 12cm kg 0.010 18,000.00 180.00
Minyak bekisting Liter
Besi Beton polos kg 3.000 - -
Kawat Beton kg 0.450 32,000.00 14,400.00
Semen Portland ( Gersik) kg 4.000 1,250.00 5,000.00
Pasir Beton m3 0.006 195,000.00 1,170.00
Koral Beton m3 0.009 412,000.00 3,708.00
JUMLAH HARGA BAHAN 28,458.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 57,378.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 57,378.00

26 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.297 112,000.00 33,264.00
Tukang Batu OH 0.033 115,000.00 3,795.00
Tukang Kayu OH 0.033 115,000.00 3,795.00
Tukang Besi OH 0.033 115,000.00 3,795.00
Kepala Tukang OH 0.010 115,000.00 1,150.00
Mandor OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 47,749.00
B. BAHAN
Kayu Kelas III m3 0.003 2,000,000.00 6,000.00
Paku Biasa 5 cm - 12 cm kg 0.020 18,000.00 360.00
Minyak bekisting Liter
Besi Beton Polos kg 3.600 - -
Kawat Beton kg 0.050 32,000.00 1,600.00
Semen kg 5.500 1,250.00 6,875.00
Pasir Beton m3 0.009 195,000.00 1,755.00
Koral Beton m3 0.015 412,000.00 6,180.00
JUMLAH HARGA BAHAN 22,770.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 70,519.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 70,519.00
27 1 M2 BEKISTING DINDING BETON BIASA DENGAN MULTIFLEX 12 mm *2 kali pakai*
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2400 112,000.00 26,880.00
Tukang Kayu OH 0.1200 115,000.00 13,800.00
Kepala Tukang OH 0.0120 115,000.00 1,380.00
Mandor OH 0.0240 130,000.00 3,120.00
JUMLAH TENAGA KERJA 45,180.00
B. BAHAN
Multiflex 12 mm Lbr 0.2030 - -
Kaso 5/7 cm M3 0.0090 - -
Paku 5 cm dan 7 cm Kg 0.2400 18,000.00 4,320.00
Minyak Bekisting L 0.2000 45,000.00 9,000.00
JUMLAH HARGA BAHAN 13,320.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 58,500.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 58,500.00

28 1 M2 BEKISTING PONDASI DAN SLOOF BETON BIASA MENGGUNAKAN PAPAN 3/20 CM *2 kali pakai*
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Kayu OH 0.1500 115,000.00 17,250.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0300 130,000.00 3,900.00
JUMLAH TENAGA KERJA 56,475.00
B. BAHAN
Papan 3/20 cm Kayu Kelas II Lbr 0.0220 - -
Kaso 5/7 cm M3 0.0160 - -
Paku 5 cm dan 7 cm Kg 0.2400 18,000.00 4,320.00
Minyak Bekisting L 0.2000 45,000.00 9,000.00
JUMLAH HARGA BAHAN 13,320.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 69,795.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 69,795.00

29 1 M2 PERANCAH/PENYOKONG BEKISTING DINDING BETON MENGGUNAKAN KAYU 5/7 ,Tinggi Maks 2,5 m *2 kali pakai*
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3600 112,000.00 40,320.00
Tukang Kayu OH 0.1800 115,000.00 20,700.00
Kepala Tukang OH 0.0180 115,000.00 2,070.00
Mandor OH 0.0360 130,000.00 4,680.00
JUMLAH TENAGA KERJA 67,770.00
B. BAHAN
Kaso 5/7 cm M3 0.0170 - -
Paku 5 cm dan 7 cm Kg 0.2400 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 67,770.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 67,770.00
30 1 M2 PERANCAH/PENYOKONG BEKISTING PONDASI DAN SLOOF BETON MENGGUNAKAN KAYU 5/7 ,Tinggi Maks 2,0 m *2 kali pakai*
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang Kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0200 130,000.00 2,600.00
JUMLAH TENAGA KERJA 37,650.00
B. BAHAN
Kaso 5/7 cm M3 0.0190 - -
Paku 5 cm dan 7 cm Kg 0.2500 18,000.00 4,500.00
JUMLAH HARGA BAHAN 4,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 42,150.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 42,150.00

VIII HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM (PERMEN PUPR 28/PRT/M/2016)
1 1 KG PEMASANGAN BESI PROFIL
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.060 112,000.00 6,720.00
Tukang las konstruksi OH 0.060 110,000.00 6,600.00
Kepala tukang OH 0.006 115,000.00 690.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 14,400.00
B. BAHAN
Besi Profil Kg 1.150 - -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 14,400.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 14,400.00

2 1 KG PEMASANGAN RANGKA KUDA-KUDA BAJA IWF


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.060 112,000.00 6,720.00
Tukang las konstruksi OH 0.060 110,000.00 6,600.00
Kepala tukang OH 0.006 115,000.00 690.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 14,400.00
B. BAHAN
Besi baja IWF Kg 1.150 - -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 14,400.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 14,400.00
3 100 KG PENGERJAAN PEKERJAAN PERAKITAN
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.060 112,000.00 6,720.00
Tukang las konstruksi OH 0.060 110,000.00 6,600.00
Kepala tukang OH 0.006 115,000.00 690.00
Mandor OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 14,400.00
B. BAHAN
Besi baja IWF Kg 1.150 - -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 14,400.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 14,400.00

4 1 M2 PEMASANGAN PINTU ROLLING DOOR BESI


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.200 112,000.00 134,400.00
Tukang las biasa OH 1.200 110,000.00 132,000.00
Kepala tukang OH 0.120 115,000.00 13,800.00
Mandor OH 0.006 130,000.00 780.00
JUMLAH TENAGA KERJA 280,980.00
B. BAHAN
Pintu gulung besi m2 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 280,980.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 280,980.00

5 1 M2 PEMASANGAN ROLLING DOOR ALLUMINIUM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.000 112,000.00 112,000.00
Tukang khusus aluminium OH 1.000 115,000.00 115,000.00
Kepala tukang OH 0.100 115,000.00 11,500.00
Mandor OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 245,000.00
B. BAHAN
Rolling door alluminium m2 1.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 245,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 245,000.00
6 1 M2 PEMASANGAN KUSEN PINTU ALLUMINIUM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.043 112,000.00 4,816.00
Tukang khusus aluminium OH 0.043 115,000.00 4,945.00
Kepala tukang OH 0.004 115,000.00 494.50
Mandor OH 0.002 130,000.00 273.00
JUMLAH TENAGA KERJA 10,528.50
B. BAHAN
Profil alluminium m 1.100 - -
Skrup fixer buah 2.000 - -
Sealant Tube 0.060 - -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 10,528.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 10,528.50

7 1 M2 PEMASANGAN PINTU ALLUMINIUM STRIP LEBAR 8 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.085 112,000.00 9,520.00
Tukang khusus aluminium OH 0.085 115,000.00 9,775.00
Kepala tukang OH 0.0085 115,000.00 977.50
Mandor OH 0.0042 130,000.00 546.00
JUMLAH TENAGA KERJA 20,818.50
B. BAHAN
Profil alluminium m 4.400 - -
Alluminium strip m 14.600 - -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 20,818.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 20,818.50

8 1 M2 PEMASANGAN RANGKA BESI HOLLOW 1 X40.40.2MM, MODUL 60 X 120 CM, UNTUK PARTISI
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang besi OH 0.250 115,000.00 28,750.00
Kepala Tukang OH 0.025 115,000.00 2,875.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 61,315.00
B. BAHAN
Rangka metal hollow 40.40.2 mm m 3.500 - -
Assesoris (perkuatan, las dll) Ls 100% x rangka - -

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 61,315.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 61,315.00
9 1 M2 PEMASANGAN RANGKA BESI HOLLOW 1 X40.40.2MM, MODUL 60 X 120 CM, UNTUK PLAFON
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.350 112,000.00 39,200.00
Tukang besi OH 0.350 115,000.00 40,250.00
Kepala Tukang OH 0.035 115,000.00 4,025.00
Mandor OH 0.018 130,000.00 2,340.00
JUMLAH TENAGA KERJA 85,815.00
B. BAHAN
Rangka metal hollow 40.40.2 mm m 4.000 38,500.00 154,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 38,500.00 38,500.00

JUMLAH HARGA BAHAN 192,500.00


C. PERALATAN

JUMLAH HARGA ALAT


D. Jumlah (A + B + C) 278,315.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 278,315.00

10 1 M2 PEMASANGAN ATAP PELANA RANGKA ATAP BAJA CANAI DINGIN PROFIL C75
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.734 112,000.00 82,208.00
Tukang besi OH 0.734 115,000.00 84,410.00
Kepala Tukang OH 0.073 115,000.00 8,395.00
Mandor OH 0.037 130,000.00 4,810.00
JUMLAH TENAGA KERJA 179,823.00
B. BAHAN
Baja ringan canai dingin C75 kg 3.065 35,000.00 107,275.00
JUMLAH HARGA BAHAN 107,275.00
C. PERALATAN
Peralatan % 10 10,727.50 10,727.50

JUMLAH HARGA ALAT 10,727.50


D. Jumlah (A + B + C) 297,825.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 297,825.50

11 1 M2 PEMASANGAN ATAP JURAI RANGKA ATAP BAJA CANAI DINGIN PROFIL C75
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.760 112,000.00 85,164.80
Tukang besi OH 0.760 115,000.00 87,446.00
Kepala Tukang OH 0.0760 115,000.00 8,740.00
Mandor OH 0.0380 130,000.00 4,940.00
JUMLAH TENAGA KERJA 186,290.80
B. BAHAN
Baja ringan canai dingin C75 kg 4.050 35,000.00 141,750.00
JUMLAH HARGA BAHAN 141,750.00
C. PERALATAN
Peralatan % 10 14,175.00 14,175.00

JUMLAH HARGA ALAT 14,175.00


D. Jumlah (A + B + C) 342,215.80
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 342,215.80
IX PEKERJAAN PENUTUP ATAP (PERMEN PUPR 28/PRT/M/2016)
1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang Kayu OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 27,385.00
B. BAHAN
Genteng Plentong bh 25.0000 3,100.00 77,500.00
JUMLAH HARGA BAHAN 77,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 104,885.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 104,885.00

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang Kayu OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 27,385.00
B. BAHAN
Genteng Plentong dicat bh 25.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 27,385.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 27,385.00

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4000 112,000.00 44,800.00
Tukang Kayu OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 70,360.00
B. BAHAN
Bubungan Plentong bh 5.0000 7,000.00 35,000.00
Semen kg 10.8000 1,250.00 13,500.00
Pasir Pasang m3 0.0320 215,000.00 6,880.00
JUMLAH HARGA BAHAN 55,380.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 125,740.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 125,740.00
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1400 112,000.00 15,680.00
Tukang Kayu OH 0.0670 115,000.00 7,705.00
Kepala Tukang OH 0.0070 115,000.00 805.00
Mandor OH 0.0070 130,000.00 910.00
JUMLAH TENAGA KERJA 25,100.00
B. BAHAN
Asbes Gelombang 1.8 mx0.92mx5mm lbr 0.6600 - -
Paku Pancing 60 x 230 kg 2.0000 25,000.00 50,000.00
JUMLAH HARGA BAHAN 50,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 75,100.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 75,100.00

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0840 112,000.00 9,408.00
Tukang Kayu OH 0.1250 115,000.00 14,375.00
Kepala Tukang OH 0.0130 115,000.00 1,495.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 25,798.00
B. BAHAN
Bubungan Stel Gelombang lbr 2.4000 - -
Paku Skrup 3,5" kg 4.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 25,798.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 25,798.00

6 1 M2 PASANGAN LAPISAN ALUMINIUM FOIL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0330 112,000.00 3,696.00
Tukang Kayu OH 0.0330 115,000.00 3,795.00
Kepala Tukang OH 0.0030 115,000.00 345.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 8,096.00
B. BAHAN
Aluminium Foil m2 1.1000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 8,096.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 8,096.00
7 1 M1 PASANG NOK SENG GELOMBANG
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang Kayu OH 0.0700 115,000.00 8,050.00
Kepala Tukang OH 0.0080 115,000.00 920.00
Mandor OH 0.0060 130,000.00 780.00
JUMLAH TENAGA KERJA 26,550.00
B. BAHAN
Seng Plat 3" x 6" BJLS 28 lbr 0.3000 - -
Paku biasa 1/2" - 1" kg 0.0400 18,000.00 720.00
JUMLAH HARGA BAHAN 720.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 27,270.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 27,270.00

8 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 112,000.00 5,600.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 8,850.00
B. BAHAN
Murda / Puntal Paras lbr 1.0000 93,000.00 93,000.00
Semen kg 0.0130 1,250.00 16.25
JUMLAH HARGA BAHAN 93,016.25
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 101,866.25
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 101,866.25

X PEKERJAAN PLAFOND / LANGIT - LANGIT (PERMEM PUPR 28/PRT/M/2016))


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0300 112,000.00 3,360.00
Tukang Kayu OH 0.0700 115,000.00 8,050.00
Kepala Tukang OH 0.0070 115,000.00 805.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 12,735.00
B. BAHAN
Asbes Semen lbr 1.1000 - -
Paku biasa 1/2" - 1" kg 0.0100 18,000.00 180.00
JUMLAH HARGA BAHAN 180.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,915.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 12,915.00
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/3 MM, 4MM, 6MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1000 112,000.00 11,200.00
Tukang Kayu OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 24,500.00
B. BAHAN
TRIIPLEKS lbr 0.3750 - -
Paku biasa 1/2" - 1" kg 0.0300 18,000.00 540.00
JUMLAH HARGA BAHAN 540.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 25,040.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 25,040.00

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.8000 112,000.00 89,600.00
Tukang Kayu OH 0.8000 115,000.00 92,000.00
Kepala Tukang OH 0.0800 115,000.00 9,200.00
Mandor OH 0.0400 130,000.00 5,200.00
JUMLAH TENAGA KERJA 196,000.00
B. BAHAN
Kayu Papan Kamper m3 0.0150 9,500,000.00 142,500.00
Paku biasa 1/2" - 1" kg 0.0100 18,000.00 180.00
JUMLAH HARGA BAHAN 142,680.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 338,680.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 338,680.00

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 112,000.00 5,600.00
Tukang Kayu OH 0.0500 115,000.00 5,750.00
Kepala Tukang OH 0.0050 115,000.00 575.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 12,315.00
B. BAHAN
List Kayu Profil 4/5 cm m3 1.0500 - -
Paku list kg 0.0100 22,000.00 220.00
JUMLAH HARGA BAHAN 220.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,535.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 12,535.00
5 1 M1 PASANG LIST LANGIT-LANGIT GYPSUM PROFIL
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0500 112,000.00 5,600.00
Tukang Kayu OH 0.0500 115,000.00 5,750.00
Kepala Tukang OH 0.0050 115,000.00 575.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 12,315.00
B. BAHAN
List Gypsum 2/5 cm m' 1.0500 - -
Paku list kg 0.0100 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,315.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 12,315.00

6 1 M2 PASANG LANGIT-LANGIT AKUSTIK UKURAN (60 x 120) CM + RANGKA ALUMINIUM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.5000 112,000.00 56,000.00
Tukang Besi OH 0.5000 115,000.00 57,500.00
Kepala Tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 122,500.00
B. BAHAN
Profil Aluminium "T" m1 3.6000 - -
Kawat Diameter 4 mm kg 0.1500 - -
Ramset m1 1.0500 - -
Akustik 60 cm x 120 cm lbr 1.5000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 122,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 122,500.00

7 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1800 112,000.00 20,160.00
Tukang Kayu OH 0.3200 115,000.00 36,800.00
Kepala Tukang OH 0.0320 115,000.00 3,680.00
Mandor OH 0.0090 130,000.00 1,170.00
JUMLAH TENAGA KERJA 61,810.00
B. BAHAN
Kamper Usuk 4/6 cm m3 0.0230 - -
Paku Biasa 2" - 5" kg 0.0600 18,000.00 1,080.00
Asbes lbr 1.1000 - -
JUMLAH HARGA BAHAN 1,080.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 62,890.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 62,890.00
8 1 M2 PLAFOND GYPSUM, RANGKA KAYU
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Kayu OH 0.3500 115,000.00 40,250.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 79,825.00
B. BAHAN
Gypsum Board (120x240x9) Lbr 0.3640 - -
Kayu Kruing Usuk M3 0.0230 7,450,000.00 171,350.00
Paku Kalsiboard Kg 0.2600 550.00 143.00
JUMLAH HARGA BAHAN 171,493.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 251,318.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 251,318.00

9 1 M2 PLAFOND GYPSUM, RANGKA HOLO


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Kayu OH 0.3500 115,000.00 40,250.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 79,825.00
B. BAHAN
Gypsum Board (120x240x9) Lbr 0.3640 50,000.00 18,200.00
#REF! Btg 1.0000 38,500.00 38,500.00
Paku Kalsiboard Kg 0.1100 550.00 60.50
JUMLAH HARGA BAHAN 56,760.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 136,585.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 136,585.50

10 1 M2 PLAFOND KALSIBOARD, RANGKA KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Kayu OH 0.3500 115,000.00 40,250.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 79,825.00
B. BAHAN
Kalsiboard (4,5 x 1220 x 2420) mm Lbr 0.3640 - -
Kayu Kruing Usuk M3 0.0230 7,450,000.00 171,350.00
Paku Kalsiboard Kg 0.2600 550.00 143.00
JUMLAH HARGA BAHAN 171,493.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 251,318.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 251,318.00
11 1 M2 PLAFOND KALSIBOARD, RANGKA HOLO
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Tukang Kayu OH 0.3500 115,000.00 40,250.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 79,825.00
B. BAHAN
Kalsiboard (4,5 x 1220 x 2420) mm Lbr 0.3640 - -
#REF! M3 1.0000 38,500.00 38,500.00
Paku Kalsiboard Kg 0.1100 550.00 60.50
JUMLAH HARGA BAHAN 38,560.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 118,385.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 118,385.50

XI PEKERJAAN SANITASI ( PERMEN PUPR 28/PRT/M/2016) )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 3.3000 112,000.00 369,600.00
Tukang Batu OH 1.1000 115,000.00 126,500.00
Kepala Tukang OH 0.0010 115,000.00 115.00
Mandor OH 0.1600 130,000.00 20,800.00
JUMLAH TENAGA KERJA 517,015.00
B. BAHAN
Kloset duduk/ monoblok bh 1.0000 - -
Perlengkapan 6% x harga kloset - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 517,015.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 517,015.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 112,000.00 112,000.00
Tukang Batu OH 1.5000 115,000.00 172,500.00
Kepala Tukang OH 1.5000 115,000.00 172,500.00
Mandor OH 0.1600 130,000.00 20,800.00
JUMLAH TENAGA KERJA 477,800.00
B. BAHAN
Kloset jongkok porselen bh 1.0000 - -
Semen kg 6.0000 1,250.00 7,500.00
Pasir Pasang m3 0.0100 215,000.00 2,150.00
JUMLAH HARGA BAHAN 9,650.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 487,450.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 487,450.00
3 MEMASANG 1 BUAH URINOIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.0000 112,000.00 112,000.00
Tukang Batu OH 1.0000 115,000.00 115,000.00
Kepala Tukang OH 0.1000 115,000.00 11,500.00
Mandor OH 0.1000 130,000.00 13,000.00
JUMLAH TENAGA KERJA 251,500.00
B. BAHAN
Urinoir bh 1.0000 - -
Perlengkapan 30% x harga Urinoir - -
Semen kg 6.0000 1,250.00 7,500.00
Pasir Pasang m3 0.0100 215,000.00 2,150.00
JUMLAH HARGA BAHAN 9,650.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 261,150.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 261,150.00

4 MEMASANG 1 BUAH WASHTAFEL KIA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.2000 112,000.00 134,400.00
Tukang Batu OH 1.4500 115,000.00 166,750.00
Kepala Tukang OH 0.1500 115,000.00 17,250.00
Mandor OH 0.1000 130,000.00 13,000.00
JUMLAH TENAGA KERJA 331,400.00
B. BAHAN
Wastafel bh 1.0000 - -
Perlengkapan 12% x harga wast - -
Semen kg 6.0000 1,250.00 7,500.00
Pasir Pasang m3 0.0100 215,000.00 2,150.00
JUMLAH HARGA BAHAN 9,650.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 341,050.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 341,050.00

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.8000 112,000.00 201,600.00
Tukang Batu OH 2.7000 115,000.00 310,500.00
Kepala Tukang OH 0.5400 115,000.00 62,100.00
Mandor OH 0.1100 130,000.00 14,300.00
JUMLAH TENAGA KERJA 588,500.00
B. BAHAN
Bak Fibreglass bh 1.0000 - -
Perlengkapan 18% x harga bak - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 588,500.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 588,500.00
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0540 112,000.00 6,048.00
Tukang Pipa OH 0.0900 115,000.00 10,350.00
Kepala Tukang OH 0.0090 115,000.00 1,035.00
Mandor OH 0.0270 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,943.00
B. BAHAN
Pipa Galvanis m' 1.2000 - -
Perlengkapan 35% x harga pipa - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 20,943.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 20,943.00

7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1080 112,000.00 12,096.00
Tukang Pipa OH 0.1800 115,000.00 20,700.00
Kepala Tukang OH 0.0180 115,000.00 2,070.00
Mandor OH 0.0054 130,000.00 702.00
JUMLAH TENAGA KERJA 35,568.00
B. BAHAN
Pipa Galvanis m' 1.2000 - -
Perlengkapan 35% x harga pipa - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 35,568.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 35,568.00

8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0360 112,000.00 4,032.00
Tukang Pipa OH 0.0600 115,000.00 6,900.00
Kepala Tukang OH 0.0060 115,000.00 690.00
Mandor OH 0.0018 130,000.00 234.00
JUMLAH TENAGA KERJA 11,856.00
B. BAHAN
Pipa PVC m' 1.2000 - -
Perlengkapan 35% x harga pipa - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 11,856.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 11,856.00
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0540 112,000.00 6,048.00
Tukang Pipa OH 0.0900 115,000.00 10,350.00
Kepala Tukang OH 0.0090 115,000.00 1,035.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 17,823.00
B. BAHAN
Pipa PVC m' 1.2000 - -
Perlengkapan 35% x harga pipa - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 17,823.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 17,823.00

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0810 112,000.00 9,072.00
Tukang Pipa OH 0.1350 115,000.00 15,525.00
Kepala Tukang OH 0.0135 115,000.00 1,552.50
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 26,669.50
B. BAHAN
Pipa PVC m' 1.2000 - -
Perlengkapan 35% x harga pipa - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 26,669.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 26,669.50

11 MEMASANG 1 M1 PIPA PVC TYPE AW f 4"


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0810 112,000.00 9,072.00
Tukang Pipa OH 0.1350 115,000.00 15,525.00
Kepala Tukang OH 0.0135 115,000.00 1,552.50
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 26,669.50
B. BAHAN
Pipa PVC m' 1.2000 - -
Perlengkapan 35% x harga pipa - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 26,669.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 26,669.50
12 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Pipa OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 12,650.00
B. BAHAN
Kran air bh 1.0000 - -
Seal tape bh 0.0250 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,650.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 12,650.00

XII PEKERJAAN BESI DAN ALUMINIUM (PERMEN PUPR 28/PRT/M/2016)


1 1 KG MEMASANG RANGKA BAJA IWF
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0060 112,000.00 672.00
Tukang besi OH 0.0600 115,000.00 6,900.00
Kepala Tukang OH 0.0060 115,000.00 690.00
Mandor OH 0.0003 130,000.00 39.00
JUMLAH TENAGA KERJA 8,301.00
B. BAHAN
Besi Baja WF kg 1.1500 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 8,301.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 8,301.00

2 1 M2 PASANG JENDELA NAKO & TRALIS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang Besi OH 0.2000 115,000.00 23,000.00
Kepala Tukang OH 0.0200 115,000.00 2,300.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 47,830.00
B. BAHAN
Rangka + Kaca Nako m2 1.1000 - -
Paku biasa 1 cm - 2,5 cm bh 10.0000 18,000.00 180,000.00
Besi strip m' 7.0000 - -
JUMLAH HARGA BAHAN 180,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 227,830.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 227,830.00
3 1 M1 PASANG TALANG DATAR, SENG BJLS 28
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2000 112,000.00 22,400.00
Tukang Besi OH 0.4000 115,000.00 46,000.00
Kepala Tukang OH 0.0250 115,000.00 2,875.00
Mandor OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 72,575.00
B. BAHAN
Seng plat lbr 1.0500 - -
Paku biasa 0,5" - 1" kg 0.0150 18,000.00 270.00
Kayu papan kelas II/III m3 0.0190 - -
JUMLAH HARGA BAHAN 270.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 72,845.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 72,845.00

XII PEKERJAAN KUNCI DAN KACA PERMEN PUPR 28/PRT/M/2016)


1 1 BH PASANG KUNCI TANAM BIASA
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH
Tukang Besi OH 0.5000 115,000.00 57,500.00
Kepala Tukang OH 0.0500 130,000.00 6,500.00
Mandor OH -
JUMLAH TENAGA KERJA 64,000.00
B. BAHAN
Kunci Tanam Biasa bh 1.0000 246,000.00 246,000.00
JUMLAH HARGA BAHAN 246,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 310,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 310,000.00

2 1 PS PASANG ENGSEL PINTU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH
Tukang Besi OH 0.1250 115,000.00 14,375.00
Kepala Tukang OH 0.0130 130,000.00 1,690.00
Mandor OH
JUMLAH TENAGA KERJA 16,065.00
B. BAHAN
Engsel Pintu ps 1.0000 52,000.00 52,000.00
JUMLAH HARGA BAHAN 52,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 68,065.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 68,065.00
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH
Tukang Besi OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 130,000.00 1,300.00
Mandor OH
JUMLAH TENAGA KERJA 12,800.00
B. BAHAN
Engsel Jendela ps 1.0000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 57,800.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 57,800.00

4 1 BH PASANG KAIT ANGIN


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH
Tukang Besi OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0010 130,000.00 130.00
Mandor OH
JUMLAH TENAGA KERJA 11,630.00
B. BAHAN
Kait Angin ps 1.0000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 46,630.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 46,630.00

5 1 BH PASANG KUNCI SLOT


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH
Tukang Besi OH 0.2500 115,000.00 28,750.00
Kepala Tukang OH 0.0250 130,000.00 3,250.00
Mandor OH
JUMLAH TENAGA KERJA 32,000.00
B. BAHAN
Kunci Slot bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 32,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 32,000.00
6 1 M2 PASANG KACA, TEBAL5 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 112,000.00 17,920.00
Tukang Besi OH 0.1600 115,000.00 18,400.00
Kepala Tukang OH 0.1600 115,000.00 18,400.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 55,760.00
B. BAHAN
Kaca bh 1.1000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 55,760.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 55,760.00

7 1 M2 PASANG KACA TEMPERED TEBAL 5 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 112,000.00 17,920.00
Tukang Besi OH 0.1600 115,000.00 18,400.00
Kepala Tukang OH 0.1600 115,000.00 18,400.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 55,760.00
B. BAHAN
Kaca bh 1.1000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 55,760.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 55,760.00
8 1 M2 PASANG KACA TEMPERED TEBAL 6 MM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 112,000.00 17,920.00
Tukang Besi OH 0.1600 115,000.00 18,400.00
Kepala Tukang OH 0.1600 115,000.00 18,400.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 55,760.00
B. BAHAN
Kaca bh 1.1000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 55,760.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 55,760.00

9 1 M2 PASANG KACA TEMPERED TEBAL 12 MM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1600 112,000.00 17,920.00
Tukang Besi OH 0.1600 115,000.00 18,400.00
Kepala Tukang OH 0.1600 115,000.00 18,400.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 55,760.00
B. BAHAN
Kaca bh 1.1000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 55,760.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 55,760.00

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING (PERMEN PUPR 28/PRT/M/2016)


1 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (40 X 40) CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.013 - -
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 44,065.00
B. BAHAN
Ubin abu-abu bh 6.63 - -
Semen kg 9.80 1,250.00 12,250.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
JUMLAH HARGA BAHAN 21,925.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,990.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,990.00
2 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (30 X 30) CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.013 - -
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 44,065.00
B. BAHAN
Ubin abu-abu bh 11.87 - -
Semen kg 10.00 1,250.00 12,500.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
JUMLAH HARGA BAHAN 22,175.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 66,240.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 66,240.00

3 1 M2 PASANG LANTAI UBIN PC ABU - ABU UKURAN (20 X 20) CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.270 112,000.00 30,240.00
Tukang Batu OH 0.135 115,000.00 15,525.00
Kepala Tukang OH 0.014 - -
Mandor OH 0.014 130,000.00 1,820.00
JUMLAH TENAGA KERJA 47,585.00
B. BAHAN
Ubin abu-abu bh 26.50 - -
Semen kg 10.40 1,250.00 13,000.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
JUMLAH HARGA BAHAN 22,675.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 70,260.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 70,260.00

4 1 M2 PASANG LANTAI UBIN WARNA UKURAN (40 X 40) CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.013 115,000.00 1,495.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 45,560.00
B. BAHAN
Ubin Warna 40 x 40 bh 6.63 - -
Semen kg 9.80 1,250.00 12,250.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
Semen warna/semen grouting kg 0.60 - -
JUMLAH HARGA BAHAN 21,925.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 67,485.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 67,485.00
5 1 M2 PASANG LANTAI UBIN WARNA 30 X 30 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.260 112,000.00 29,120.00
Tukang Batu OH 0.13 115,000.00 14,950.00
Kepala Tukang OH 0.013 115,000.00 1,495.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 47,255.00
B. BAHAN
Ubin Warna 30 x 30 bh 11.87 - -
Semen kg 10.00 1,250.00 12,500.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
Semen warna/semen grouting kg 0.60 - -
JUMLAH HARGA BAHAN 22,175.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 69,430.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 69,430.00

6 1 M2 PASANG LANTAI UBIN WARNA 20 X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.270 112,000.00 30,240.00
Tukang Batu OH 0.135 115,000.00 15,525.00
Kepala Tukang OH 0.014 115,000.00 1,610.00
Mandor OH 0.014 130,000.00 1,820.00
JUMLAH TENAGA KERJA 49,195.00
B. BAHAN
Ubin Warna 20 x 20 bh 26.50 - -
Semen kg 10.40 1,250.00 13,000.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
Semen warna/semen grouting kg 1.00 - -
JUMLAH HARGA BAHAN 22,675.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 71,870.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 71,870.00

7 1 M2 PASANG LANTAI UBIN TERASO UKURAN 40 X 40 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.013 115,000.00 1,495.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 45,560.00
B. BAHAN
Ubin Teraso 40 x 40 bh 6.63 - -
Semen Portland (Gersik) kg 9.80 1,250.00 12,250.00
Pasir Pasang m3 1.30 215,000.00 279,500.00
Semen warna/semen grouting kg 0.045 - -
JUMLAH HARGA BAHAN 291,750.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 337,310.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 337,310.00
8 1 M2 PASANG LANTAI UBIN TERASO UKURAN 30 X 30 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.260 112,000.00 29,120.00
Tukang Batu OH 0.130 115,000.00 14,950.00
Kepala Tukang OH 0.013 115,000.00 1,495.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 47,255.00
B. BAHAN
Ubin Teraso 40 x 40 bh 11.87 - -
Semen Portland (Gersik) kg 10.00 1,250.00 12,500.00
Pasir Pasang m3 1.50 215,000.00 322,500.00
Semen warna/semen grouting kg 0.045 - -
JUMLAH HARGA BAHAN 335,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 382,255.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 382,255.00

9 1 M2 PASANG LANTAI UBIN GRANIT UKURAN 40 X 40 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.125 115,000.00 14,375.00
Kepala Tukang OH 0.013 115,000.00 1,495.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 45,560.00
B. BAHAN
Ubin Teraso 40 x 40 bh 6.63 - -
Semen Portland (Gersik) kg 9.80 1,250.00 12,250.00
Pasir Pasang m3 1.30 215,000.00 279,500.00
Semen warna/semen grouting kg 0.045 - -
JUMLAH HARGA BAHAN 291,750.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 337,310.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 337,310.00

10 1 M2 PASANG LANTAI UBIN GRANIT UKURAN 30 X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.260 112,000.00 29,120.00
Tukang Batu OH 0.130 115,000.00 14,950.00
Kepala Tukang OH 0.013 115,000.00 1,495.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 47,255.00
B. BAHAN
Ubin Granit 30 x 30 bh 11.87 - -
Semen Portland (Gersik) kg 10.00 1,250.00 12,500.00
Pasir Pasang m3 1.50 215,000.00 322,500.00
Semen warna/semen grouting kg 0.045 - -
JUMLAH HARGA BAHAN 335,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 382,255.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 382,255.00
11 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40 X 40 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.250 112,000.00 28,000.00
Tukang Batu OH 0.130 115,000.00 14,950.00
Kepala Tukang OH 0.013 115,000.00 1,495.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 46,135.00
B. BAHAN
Marmer Granit 40 x 40 bh 6.63 - -
Semen Portland (Gersik) kg 9.80 1,250.00 12,250.00
Pasir Pasang m3 1.30 215,000.00 279,500.00
Semen warna/semen grouting kg 0.045 - -
JUMLAH HARGA BAHAN 291,750.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 337,885.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 337,885.00

12 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 30 X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.260 112,000.00 29,120.00
Tukang Batu OH 0.130 115,000.00 14,950.00
Kepala Tukang OH 0.013 115,000.00 1,495.00
Mandor OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 47,255.00
B. BAHAN
Ubin Granit 30 x 30 bh 11.87 - -
Semen Portland (Gersik) kg 10.00 1,250.00 12,500.00
Pasir Pasang m3 1.50 215,000.00 322,500.00
Semen warna/semen grouting kg 0.045 - -
JUMLAH HARGA BAHAN 335,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 382,255.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 382,255.00

13 1 M2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60 X 60 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.24 112,000.00 26,880.00
Tukang Batu OH 0.12 115,000.00 13,800.00
Kepala Tukang OH 0.012 115,000.00 1,380.00
Mandor OH 0.012 130,000.00 1,560.00
JUMLAH TENAGA KERJA 43,620.00
B. BAHAN
Keramik 60 x 60 bh 3.10 - -
Semen kg 9.60 1,250.00 12,000.00
Pasir Pasang m3 0.045 215,000.00 9,675.00
Semen warna/semen grouting kg 1.50 - -
JUMLAH HARGA BAHAN 21,675.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 65,295.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 65,295.00
14 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.7000 112,000.00 78,400.00
Tukang Batu OH 0.3500 115,000.00 40,250.00
Kepala Tukang OH 0.0350 115,000.00 4,025.00
Mandor OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 127,225.00
B. BAHAN
Keramik 20 x 20 bh 26.5000 - -
Semen kg 10.4000 1,250.00 13,000.00
Pasir Pasang m3 0.0450 215,000.00 9,675.00
Semen warna/semen grouting kg 1.6200 - -
JUMLAH HARGA BAHAN 22,675.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 149,900.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 149,900.00

15 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 15 CM X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint ubin PC bh 5.30 - -
Semen Portland kg 1.65 1,250.00 2,062.50
Pasir Pasang m3 0.004 215,000.00 860.00
JUMLAH HARGA BAHAN 2,922.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 25,037.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 25,037.50

16 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 10 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint ubin PC bh 3.53 - -
Semen Portland kg 1.24 1,250.00 1,550.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,195.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,310.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,310.00
17 1 M' PASANGPLINT UBIN PC ABU-ABU UKURAN 10 CM X 40 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint ubin PC bh 2.65 - -
Semen Portland kg 1.24 1,250.00 1,550.00
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,195.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,310.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,310.00

18 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint ubin warna bh 2.65 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.15 - -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00

19 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint ubin warna bh 2.65 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.15 - -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00
20 1 M' PASANGPLINT UBIN WARNA UKURAN 10 CM X 40 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint ubin warna bh 2.65 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 - -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00

21 1 M' PASANGPLINT UBIN TERASO UKURAN 10 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint ubin teraso bh 3.53 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 - -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00

22 1 M' PASANG PLINT UBIN TERASO UKURAN 10 CM X 40 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint ubin teraso bh 2.65 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 - -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00
23 1 M' PASANG PLINT UBIN GRANIT UKURAN 10 CM X 40 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint ubin granit bh 2.65 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00

24 1 M' PASANG PLINT UBIN GRANIT UKURAN 10 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint ubin granit bh 3.53 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 - -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00

25 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 CM X 40 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint teralux kerang bh 2.63 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 - -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00
26 1 M' PASANG PLINT UBIN TERALUX KERANG UKURAN 10 CM X 30 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint teralux kerang bh 3.53 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 - -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00

27 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 60 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint teralux marmer bh 1.70 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 - -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00

28 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 40 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint teralux marmer bh 2.65 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 - -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00
29 1 M' PASANG PLINT UBIN TERALUX MARMER UKURAN 10 CM X 30 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Plint teralux marmer bh 2.65 - -
Semen Portland kg 1.14 1,250.00 1,425.00
Semen Warna kg 0.10 - -
Pasir Pasang m3 0.003 215,000.00 645.00
JUMLAH HARGA BAHAN 2,070.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,185.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,185.00

30 1 M2 PASANG LANTAI KERAMIK UKURAN 33 CM X 33 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Ubin keramik Doos 1.05 7,132.08 7,488.68
Semen Portland (Gersik) Kg 10.00 1,250.00 12,500.00
Pasir Pasang M3 0.045 215,000.00 9,675.00
Semen Warna Kg 0.50 - -

JUMLAH HARGA BAHAN 19,988.68


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 42,103.68
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 42,103.68

31 1 M2 PASANG LANTAI KERAMIK UKURAN 30 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.009 115,000.00 1,035.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 22,115.00
B. BAHAN
Ubin keramik Doos 1.05 55,000.00 57,750.00
Semen Portland (Gersik) Kg 10.00 1,250.00 12,500.00
Pasir Pasang M3 0.045 215,000.00 9,675.00
Semen Warna Kg 0.50 13,500.00 6,750.00

JUMLAH HARGA BAHAN 70,250.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 92,365.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 92,365.00
32 1 M2 PASANG LANTAI KERAMIK UKURAN 20 CM X 20 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.70 112,000.00 78,400.00
Tukang Batu OH 0.35 115,000.00 40,250.00
Kepala Tukang OH 0.035 115,000.00 4,025.00
Mandor OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 127,225.00
B. BAHAN
Ubin keramik Doos 1.05 - -
Semen Portland (Gersik) Kg 10.40 1,250.00 13,000.00
Pasir Pasang M3 0.045 215,000.00 9,675.00
Semen Warna Kg 0.50 13,500.00 6,750.00

JUMLAH HARGA BAHAN 13,000.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 140,225.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 140,225.00

33 1 M2 PASANG LANTAI KERAMIK UKURAN 10 CM X 33 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.05 112,000.00 117,600.00
Tukang Batu OH 0.525 115,000.00 60,375.00
Kepala Tukang OH 0.053 115,000.00 6,095.00
Mandor OH 0.053 130,000.00 6,890.00
JUMLAH TENAGA KERJA 190,960.00
B. BAHAN
Ubin keramik bh 33.00 - -
Semen Portland (Gersik) Kg 9.80 1,250.00 12,250.00
Pasir Pasang M3 0.045 215,000.00 9,675.00
Semen Warna Kg 4.37 13,500.00 58,995.00

JUMLAH HARGA BAHAN 12,250.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 203,210.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 203,210.00

34 1 M2 PASANG LANTAI KERAMIK MOZAIK UKURAN 30 CM X 30 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.70 112,000.00 78,400.00
Tukang Batu OH 0.350 115,000.00 40,250.00
Kepala Tukang OH 0.035 115,000.00 4,025.00
Mandor OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 127,225.00
B. BAHAN
Ubin keramik Doos 11.87 - -
Semen Portland (Gersik) Kg 14.15 1,250.00 17,687.50
Pasir Pasang M3 0.039 215,000.00 8,385.00
Semen Warna Kg 2.00 13,500.00 27,000.00

JUMLAH HARGA BAHAN 17,687.50


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 144,912.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 144,912.50
35 1 M' PASANG PLINT KERAMIK UKURAN 10 CM X 20 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.035 115,000.00 4,025.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 25,105.00
B. BAHAN
Plint keramik Bh 5.30 - -
Semen Portland (Gersik) Kg 1.14 1,250.00 1,425.00
Pasir Pasang M3 0.003 215,000.00 645.00
Semen Warna Kg 0.025 13,500.00 337.50

JUMLAH HARGA BAHAN 1,425.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 26,530.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 26,530.00

36 1 M' PASANG PLINT KERAMIK UKURAN 10 CM X 10 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.035 115,000.00 4,025.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 25,105.00
B. BAHAN
Plint keramik Bh 10.60 - -
Semen Portland (Gersik) Kg 1.14 1,250.00 1,425.00
Pasir Pasang M3 0.003 215,000.00 645.00
Semen Warna Kg 0.05 13,500.00 675.00

JUMLAH HARGA BAHAN 1,425.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 26,530.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 26,530.00

37 1 M' PASANG PLINT KERAMIK UKURAN 5 CM X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.09 112,000.00 10,080.00
Tukang Batu OH 0.09 115,000.00 10,350.00
Kepala Tukang OH 0.035 115,000.00 4,025.00
Mandor OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 25,105.00
B. BAHAN
Plint keramik Bh 5.30 - -
Semen Portland (Gersik) Kg 0.57 1,250.00 712.50
Pasir Pasang M3 0.0015 215,000.00 322.50
Semen Warna Kg 0.013 13,500.00 175.50

JUMLAH HARGA BAHAN 712.50


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 25,817.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 25,817.50
38 1 M2 PASANG DINDING KERAMIK 10 CM X 20 CM
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.90 112,000.00 100,800.00
Tukang Batu OH 0.45 115,000.00 51,750.00
Kepala Tukang OH 0.045 115,000.00 5,175.00
Mandor OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 163,575.00
B. BAHAN
Keramik dinding buah 53.00 - -
Semen Portland Kg 9.30 1,250.00 11,625.00
Pasir pasang M3 0.018 215,000.00 3,870.00
Semen warna Kg 2.75 13,500.00 37,125.00
JUMLAH HARGA BAHAN 11,625.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 175,200.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 175,200.00

39 1 M2 PASANG DINDING KERAMIK 20 CM X 20 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.90 112,000.00 100,800.00
Tukang Batu OH 0.45 115,000.00 51,750.00
Kepala Tukang OH 0.045 115,000.00 5,175.00
Mandor OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 163,575.00
B. BAHAN
Keramik dinding buah 26.50 - -
Semen Portland Kg 9.30 1,250.00 11,625.00
Pasir pasang M3 0.018 215,000.00 3,870.00
Semen warna Kg 1.94 13,500.00 26,190.00
JUMLAH HARGA BAHAN 11,625.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 175,200.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 175,200.00

40 1 M2 PASANG DINDING MARMER 100 CM X 100 CM


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 1.30 112,000.00 145,600.00
Tukang Batu OH 0.65 115,000.00 74,750.00
Kepala Tukang OH 0.065 115,000.00 7,475.00
Mandor OH 0.065 130,000.00 8,450.00
JUMLAH TENAGA KERJA 236,275.00
B. BAHAN
Keramik dinding buah 1.06 - -
Semen Portland Kg 12.44 1,250.00 15,550.00
Pasir pasang M3 0.025 215,000.00 5,375.00
Semen warna Kg 0.65 13,500.00 8,775.00
Paku 12 cm buah 3.03 18,000.00 54,540.00
JUMLAH HARGA BAHAN
15,550.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 251,825.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 251,825.00
41 1 M2 PEMASANGAN PAVING BLOCK NATURAL Tebal 6 cm ( 20x20 cm)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.5000 115,000.00 57,500.00
Pekerja OH 0.2500 112,000.00 28,000.00
Kepala tukang OH 0.0500 115,000.00 5,750.00
Mandor OH 0.0013 130,000.00 169.00
JUMLAH TENAGA KE ` 91,419.00
B. BAHAN
Paving 20 x 20 cm tebal 6 cm K225 m2 1.01 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 91,419.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 91,419.00

42 1 M2 PEMASANGAN PAVING BLOCK BERWARNA Tebal 6 cm ( 20x20 cm)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.5000 - -
Pekerja OH 0.2500 - -
Kepala tukang OH 0.0500 - -
Mandor OH 0.0013 - -
JUMLAH TENAGA KE ` -
B. BAHAN
Paving 20 x 20 cm tebal 6 cm K225 ( Warna ) m2 1.01 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) -

43 1 M2 PEMASANGAN PAVING BLOCK BERWARNA Tebal 8 cm ( 20x20 cm)


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.5000 - -
Pekerja OH 0.5000 - -
Kepala tukang OH 0.0500 - -
Mandor OH 0.0013 - -
JUMLAH TENAGA KE ` -
B. BAHAN
Paving 20 x 20 cm tebal 8 cm K225 ( Warna ) m2 1.01 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) -
44 1 M2 PEMASANGAN PAVING BLOCK NATURAL Tebal 8 cm ( 20x20 cm)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang Batu OH 0.5000 - -
Pekerja OH 0.5000 - -
Kepala tukang OH 0.0500 - -
Mandor OH 0.0013 - -
JUMLAH TENAGA KE ` -
B. BAHAN
Paving 20 x 20 cm tebal 8 cm K225 ( Natural ) m2 1.01 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) -

XIV PEKERJAAN PENGECATAN (PERMEN PUPR 28/PRT/M/2016)


1 1 M2 PEKERJAAN MENGIKIS ATAU MENGEROK CAT TEMBOK CARA MANUAL
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 17,840.00
B. BAHAN
Kapi bh 0.0500 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 17,840.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 17,840.00
2 1 M2 PEKERJAAN LAPIS PLAMIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0200 112,000.00 2,240.00
Tukang cat OH 0.0300 115,000.00 3,450.00
Kepala Tukang OH 0.0030 115,000.00 345.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 6,165.00
B. BAHAN
Plamir Tembok kg 0.1000 -
Amplas Lbr 0.5000 -
Kapi bh 0.0500 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 6,165.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 6,165.00

3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0200 112,000.00 2,240.00
Tukang cat OH 0.0630 115,000.00 7,245.00
Kepala Tukang OH 0.0063 115,000.00 724.50
Mandor OH 0.0025 130,000.00 325.00
JUMLAH TENAGA KERJA 10,534.50
B. BAHAN
Plamir kg 0.1000 - -
Cat dasar kg 0.1000 - -
Cat Penutup 2x kg 0.2600 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 10,534.50
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 10,534.50

4 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN KUAS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0600 112,000.00 6,720.00
Tukang cat OH 0.0500 115,000.00 5,750.00
Kepala Tukang OH 0.0050 115,000.00 575.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 13,435.00
B. BAHAN
Cat Tembok Vinilex kg 0.2400 - -
Kuas Bh 0.0150 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 13,435.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 13,435.00
5 1 M2 PEKERJAAN PENGECATAN BIDANG TEMBOK LAMA 2 LAPIS DENGAN ROLL
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0400 112,000.00 4,480.00
Tukang cat OH 0.0300 115,000.00 3,450.00
Kepala Tukang OH 0.0030 115,000.00 345.00
Mandor OH 0.0020 130,000.00 260.00
JUMLAH TENAGA KERJA 8,535.00
B. BAHAN
Cat Tembok Vinilex kg 0.4700 - -
Roll Bh 0.0100 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 8,535.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 8,535.00

6 1 M2 PEKERJAAN PENGECATAN LANGIT -LANGIT 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN KUAS TERMASUK PLAMIR
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0800 112,000.00 8,960.00
Tukang cat OH 0.0600 115,000.00 6,900.00
Kepala Tukang OH 0.0060 115,000.00 690.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 17,070.00
B. BAHAN
Plamir Tembok kg 0.1000 -
Cat Tembok Vinilex Kg 0.2400 - -
Amplas Lbr 0.5000 -
Kuas Bh 0.0150 - -
Kapi Bh 0.0500 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 17,070.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 17,070.00

7 1 M2 PEKERJAAN PENGECATAN PLAFOND 2 LAPIS DENGAN CAT TEMBOK MENGGUNAKAN ROLL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0600 112,000.00 6,720.00
Tukang cat OH 0.0400 115,000.00 4,600.00
Kepala Tukang OH 0.0040 115,000.00 460.00
Mandor OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 12,170.00
B. BAHAN
Plamir Tembok kg 0.1000 25,000.00 2,500.00
Cat Tembok Vinilex Kg 0.4700 15,000.00 7,050.00
Amplas Lbr 0.5000 5,000.00 2,500.00
Roll Bh 0.0100 15,000.00 150.00
Kapi Bh 0.0500 5,000.00 250.00
JUMLAH HARGA BAHAN 12,450.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 24,620.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 24,620.00
8 1 M2 WATERPROOFING
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0150 112,000.00 1,680.00
Tukang cat OH 0.1600 115,000.00 18,400.00
Kepala Tukang OH 0.0140 115,000.00 1,610.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 22,340.00
B. BAHAN
Waterprofing dumplix 3 kg 0.4500 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 22,340.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 22,340.00

9 1 M2 PEKERJAAN PASANG WALL PAPER DENGAN PEREKAT SILK HOUSE


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0100 112,000.00 1,120.00
Tukang cat OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
Mandor OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 14,420.00
B. BAHAN
Wall Paper m2 1.1000 - -
Perekat Kg 0.2000 -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 14,420.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 14,420.00

10 1 M2 PEKERJAAN MELAPIS MENI KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0750 112,000.00 8,400.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 8,920.00
B. BAHAN
Meni kg 0.1700 - -
Minyak Cat ltr 0.1000 - -
Kuas bh 0.0150 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 8,920.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 8,920.00
11 1 M2 PEKERJAAN MENDEMPUL ATAU MEMPLAMIR DAN MENGGOSOK KAYU
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.1100 115,000.00 12,650.00
Kepala Tukang OH 0.0110 115,000.00 1,265.00
JUMLAH TENAGA KERJA 13,915.00
B. BAHAN
Dempul kayu kg 0.1500 - -
Plamir Kayu Kg 0.0080 - -
Minyak Cat Ltr 0.1000 - -
Amplas Lbr 1.0000 5,000.00 5,000.00
Kuas Bh 0.0150 - -
JUMLAH HARGA BAHAN 5,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 18,915.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 18,915.00

12 1 M2 PEKERJAAN PENGECATAN DASAR 1 LAPIS PADA KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.0750 115,000.00 8,625.00
Kepala Tukang OH 0.0080 115,000.00 920.00
JUMLAH TENAGA KERJA 9,545.00
B. BAHAN
Cat Dasar Kg 0.1700 60,000.00 10,200.00
Minyak Cat Ltr 0.1000 40,000.00 4,000.00
Amplas Lbr 1.0000 5,000.00 5,000.00
Kuas Bh 0.0150 10,000.00 150.00
JUMLAH HARGA BAHAN 19,350.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 28,895.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 28,895.00

13 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA KAYU


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang cat OH 0.1500 115,000.00 17,250.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 36,815.00
B. BAHAN
Cat Tembok Vinilex kg 0.3000 60,000.00 18,000.00
Minyak Cat Ltr 0.2000 40,000.00 8,000.00
Kuas Bh 0.0200 10,000.00 200.00
JUMLAH HARGA BAHAN 26,200.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 63,015.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 63,015.00
14 1 M2 PEKERJAAN MENGEROK KARAT ATAU CAT PADA PERMUKAAN BAJA DENGAN SODA API
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.3000 112,000.00 33,600.00
Mandor OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 35,550.00
B. BAHAN
Amplas Lbr 0.5000 5,000.00 2,500.00
Sikat Baja Bh 0.0500 - -
Soda Api Kg 0.0500 - -
JUMLAH HARGA BAHAN 2,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 38,050.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 38,050.00

15 1 M2 PEKERJAAN MELAPIS MENI PADA PERMUKAAN BAJA


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0750 112,000.00 8,400.00
Mandor OH 0.0040 130,000.00 520.00
JUMLAH TENAGA KERJA 8,920.00
B. BAHAN
Meni kg 0.1000 - -
Minyak Cat Kg 0.1000 40,000.00 4,000.00
Amplas Bh 0.5000 5,000.00 2,500.00
Kuas Bh 0.0150 10,000.00 150.00
JUMLAH HARGA BAHAN 6,650.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 15,570.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 15,570.00

16 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA SECARA MANUAL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.1500 112,000.00 16,800.00
Tukang cat OH 0.1500 115,000.00 17,250.00
Kepala Tukang OH 0.0150 115,000.00 1,725.00
Mandor OH 0.0080 130,000.00 1,040.00
JUMLAH TENAGA KERJA 36,815.00
B. BAHAN
Cat Warna Zingkronasi Kg 0.2000 - -
Minyak Cat Kg 0.1000 40,000.00 4,000.00
Kuas Bh 0.0200 10,000.00 200.00
JUMLAH HARGA BAHAN 4,200.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 41,015.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 41,015.00
17 1 M2 PEKERJAAN MENGECAT PENUTUP 2 LAPIS PADA PERMUKAAN BAJA/KAYU DENGAN SEMPROT
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.0200 112,000.00 2,240.00
Tukang cat OH 0.1500 115,000.00 17,250.00
Kepala Tukang OH 0.0010 115,000.00 115.00
Mandor OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 19,735.00
B. BAHAN
Cat Warna Zingkronasi Kg 0.4000 - -
Minyak Cat Kg 0.1000 40,000.00 4,000.00
JUMLAH HARGA BAHAN 4,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 23,735.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 23,735.00

18 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN TEAK OIL


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 12,650.00
B. BAHAN
Teak Oil Ltr 0.3000 - -
Amplas Lbr 0.5000 5,000.00 2,500.00
Kuas Bh 0.0150 10,000.00 150.00
JUMLAH HARGA BAHAN 2,650.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 15,300.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 15,300.00

19 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN POLITUR 2 LAPIS


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.2500 112,000.00 28,000.00
Tukang cat OH 0.2500 115,000.00 28,750.00
Kepala Tukang OH 0.0250 115,000.00 2,875.00
Mandor OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 61,315.00
B. BAHAN
Wood Filler Kg 0.1000 30,000.00 3,000.00
Politur Jadi Ltr 0.2000 75,000.00 15,000.00
Amplas Lbr 1.0000 5,000.00 5,000.00
Kuas Bh 0.0200 10,000.00 200.00
JUMLAH HARGA BAHAN 23,200.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 84,515.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 84,515.00
20 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN VERNIS 2 LAPIS
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 12,650.00
B. BAHAN
Vernis Ltr 0.3000 - -
Amplas Lbr 0.5000 5,000.00 2,500.00
Kuas Bh 0.0200 10,000.00 200.00
JUMLAH HARGA BAHAN 2,700.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 15,350.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 15,350.00

21 1 M2 PEKERJAAN PELAPISAN BIDANG KAYU DENGAN RESIDU/TER


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Tukang cat OH 0.1000 115,000.00 11,500.00
Kepala Tukang OH 0.0100 115,000.00 1,150.00
JUMLAH TENAGA KERJA 12,650.00
B. BAHAN
Residu/ter Ltr 0.3500 - -
Minyak Tanah Ltr 0.0300 - -
Kuas Bh 0.0200 10,000.00 200.00
JUMLAH HARGA BAHAN 200.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 12,850.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 12,850.00

XVII PEKERJAAN ELEKTRIKAL (PERMEN PUPR 28/PRT/2016)


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 55,000.00 55,000.00
JUMLAH TENAGA KERJA 55,000.00
B. BAHAN
Kabel NYM 3 x 2.5 mm ex. Supreme m1 8.0000 15,500.00 124,000.00
Pipa Clipsal 20 mm hitam bt 3.0000 12,000.00 36,000.00
Tee dos clipsal 20 mm hitam bh 2.0000 8,000.00 16,000.00
Klem clipsal 20 mm hitam bj 15.0000 3,000.00 45,000.00
Sock clipsal 20 mm hitam bj 3.0000 3,000.00 9,000.00
Inbow dos plastik clipsal E 157 P bj 1.0000 8,000.00 8,000.00
JUMLAH HARGA BAHAN 238,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 293,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 293,000.00
2 1 TITIK INSTALASI AC
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kabel NYM 3 x 2.5 mm ex. Supreme m1 10.0000 15,500.00 155,000.00
Pipa Clipsal 20 mm hitam bt 3.0000 12,000.00 36,000.00
Tee dos clipsal 20 mm hitam bh 1.0000 8,000.00 8,000.00
Klem clipsal 20 mm hitam bj 15.0000 3,000.00 45,000.00
Sock clipsal 20 mm hitam bj 4.0000 3,000.00 12,000.00
Inbow dos plastik clipsal E 157 P bj 1.0000 8,000.00 8,000.00
Pipa flexible clipsal 20 mm hitam m1 1.0000 12,000.00 12,000.00
JUMLAH HARGA BAHAN 276,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 276,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 276,000.00

3 1 TITIK INSTALASI TELEPHONE


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Kabel Telephone m1 25.0000 - -
Pipa Clipsal 20 mm hitam bt 8.0000 12,000.00 96,000.00
Tee dos clipsal 20 mm hitam bh 1.0000 8,000.00 8,000.00
Klem clipsal 20 mm hitam bj 25.0000 3,000.00 75,000.00
Sock clipsal 20 mm hitam bj 5.0000 3,000.00 15,000.00
Inbow dos plastik clipsal E 157 P bj 1.0000 8,000.00 8,000.00
JUMLAH HARGA BAHAN 202,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 202,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 202,000.00

4 1 TITIK INSTALASI MATV


KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Coaxial cable 5C-75 ohm commscof m1 20.0000 - -
Pipa Clipsal 20 mm hitam bt 6.0000 3,000.00 18,000.00
Tee dos clipsal 20 mm hitam bh 2.0000 8,000.00 16,000.00
Klem clipsal 20 mm hitam bj 20.0000 3,000.00 60,000.00
Sock clipsal 20 mm hitam bj 6.0000 3,000.00 18,000.00
Inbow dos plastik clipsal E 157 P bj 1.0000 8,000.00 8,000.00
JUMLAH HARGA BAHAN 120,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 120,000.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 120,000.00
5 1 TITIK PEMASANGAN LAMPU
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Biaya Pasang ttk 1.0000 - -
JUMLAH TENAGA KERJA -
B. BAHAN
Lampu Philip 18 watt bh 1.0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) -
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) -

XVIII PEKERJAAN ANGKUT MATERIAL DAN/ ATAU HASIL GALIAN (PERMEN PUPR 28/PRT/M/2016)
1 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 50 M'
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.4220 112,000.00 47,264.00
Mandor OH 0.0211 130,000.00 2,743.00
JUMLAH TENAGA KERJA 50,007.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 50,007.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 50,007.00

2 MENGANGKUT 1 M3 MATERIAL ATAU HASIL GALIAN DENGAN JARAK ANGKUT 100 M'
KOEFISIEN HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.6000 112,000.00 67,200.00
Mandor OH 0.0300 - -
JUMLAH TENAGA KERJA 67,200.00
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 67,200.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 67,200.00
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN TAMBAHAN
TAHUN 2019

NO URAIAN PEKERJAAN HARGA

1 2 3

1 1 M2 PEMBUATAN STEGGER DENGAN SCAFHOLDING 120 x 180 h 190 (Sewa) Rp 181,424.00


2 PEMBESIAN 10 KG DENGAN BESI POLOS Rp 124,915.00
3 PEMBESIAN 1 KG DENGAN BESI POLOS Rp 12,491.50
4 PEMBESIAN 10 KG DENGAN BESI ULIR Rp 21,875.00
5 PEMBESIAN 1 KG DENGAN BESI ULIR Rp 2,187.50
6 1 BH PEKERJAAN PASANGAN MURDA/BETALA/IKUT CELEDU Rp 101,866.25

XVI PEKERJAAN STYLE BALI


1 1 M2 PASANGAN BATA GOSOK 2 MUKA Rp 170,584.00
2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA Rp 170,584.00
3 1 M2 PASANGAN BATA PRESS 1 MUKA Rp 205,292.00
4 1 M2 PASANGAN PARAS 1 MUKA Rp 205,292.00
5 1 M2 PASANGAN BATU PALIMANAN TEBAL 3 CM Rp 205,292.00
6 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA Rp 206,615.00
7 1 M2 PASANGAN BATA GOSOK DIUKIR Rp 360,292.00
8 1 M2 PASANGAN BATU TABAS KARANGASEM DIUKIR Rp 360,292.00
9 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR Rp 286,615.00
10 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP IJUK Rp 400,000.00
11 1 UNIT SANGGAH KEMULAN BT HITAM 40cm x 90cm ATAP GENTENG Rp 490,000.00
12 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP IJUK Rp 820,000.00
13 1 UNIT SANGGAH KEMULAN PARAS BATA 40cm x 90cm ATAP GENTENG Rp 840,000.00
14 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP IJUK 190cmX190cm Rp 860,000.00
15 1 UNIT SANGGAH PERTIWI BATU HITAM ATAP GENTENG 190cmx190cm Rp 860,000.00
16 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP IJUK 190cmx190cm Rp 1,040,000.00
17 1 UNIT SANGGAH PERTIWI PARAS BATA ATAP GENTENG 190cmx190cm Rp 1,955,500.00
18 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP IJUK 200CMX200CM Rp 1,750,000.00
19 1 UNIT SANGGAH HYANG IBU BATU HITAM ATAP GENTENG 200CMX200CM Rp 2,275,000.00
20 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP IJUK 200CMX200CM Rp 3,295,000.00
21 1 UNIT SANGGAH HYANG IBU PARAS BATA ATAP GENTENG 200CMX200CM Rp 2,270,000.00
22 1 UNIT SANGGAH TAKSU BATU HITAM ATAP IJUK 40cmx40cm Rp 337,500.00
23 1 UNIT SANGGAH TAKSU BATU HITAM ATAP GENTENG 40cmx40cm Rp 449,500.00
24 1 UNIT SANGGAH TAKSU PARAS BATA ATAP IJUK 40cmx40cm Rp 622,500.00
25 1 UNIT SANGGAH TAKSU PARAS BATA ATAP GENTENG 40cmx40cm Rp 734,500.00

XVII PEKERJAAN HARDDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225 Rp. 88,000.00
2 1 M2 PASANGAN Paving 10 x 20 cm tebal 6 cm K350 Rp. 88,000.00
3 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K225 Rp. 88,000.00
4 1 M2 PASANGAN Paving 10 x 20 cm tebal 8 cm K350 Rp. 88,000.00
5 1 M2 PASANGAN Paving 20 x 20 cm tebal 6 cm K350 Rp. 88,000.00
6 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K225 Rp. 88,000.00
7 1 M2 PASANGAN Paving 20 x 20 cm tebal 8 cm K350 Rp. 88,000.00
8 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 pc Rp. 88,000.00
9 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 merah Rp. 88,000.00
10 1 M2 PASANGAN Paving segi enam xexagon 6 cm K225 hitam Rp. 88,000.00
11 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 pc Rp. 88,000.00
12 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 merah Rp. 88,000.00
13 1 M2 PASANGAN Paving segi enam xexagon 6 cm K300 hitam Rp. 88,000.00
14 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 pc Rp. 88,000.00
15 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 merah Rp. 88,000.00
16 1 M2 PASANGAN Paving segi enam xexagon 6 cm K350 hitam Rp. 88,000.00
17 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 pc Rp. 88,000.00
18 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 merah Rp. 88,000.00
19 1 M2 PASANGAN Paving segi enam xexagon 6 cm K400 hitam Rp. 88,000.00
20 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 pc Rp. 88,000.00
21 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 merah Rp. 88,000.00
22 1 M2 PASANGAN Paving bujur sangkar tanpa tias 6 cm K225 hitam Rp. 88,000.00
23 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 pc Rp. 88,000.00
24 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 merah Rp. 88,000.00
25 1 M2 PASANGAN Paving bujur sangkar tanpa tias 8 cm K225 hitam Rp. 88,000.00
26 1 M2 PASANGAN Paving Tiga Berlian tebal 6 cm K225 pc Rp. 88,000.00
27 1 M2 PASANGAN GRASS BLOCK Rp. -
28 1 M2 PASANGAN KORAL SIKAT Rp. 50,692.80
29 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225 Rp. 152,551.00
30 Kanstein Jumbo (P:50,L:15,T:30 cm K225) Rp. 152,551.00
31 Kanstein kotak (P:50,t.20,La.10,Lb.16cm) K225 Rp. 152,551.00
32 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K225 ) Rp. 152,551.00
33 Kanstein kursi ( P.50, L.10, T.40cm,lb 17,5 cm K300 ) Rp. 152,551.00
34 Kanstein Segi Lima Jumbo (P:50,L:15, T:20 cm K225) Rp. 152,551.00
35 Kanstein Segi Lima Jumbo (P:40,L:10, T:20 cm K225) Rp. 152,551.00
36 1 Buah Pasangan Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) Rp. 152,551.00
37 1 M2 PENGECATAN KANSTEIN Rp. 22,545.00
38 PASANGAN BUIS BETON DIAMETER 80 CM Rp. 37,432.50
39 PASANGAN Buis Beton Diameter 50 x 75 Rp. 37,432.50
40 PASANGAN BUIS BETON DIAMETER 25 CM Rp. 37,432.50
41 1 M2 BONGKARAN PAVING LAMA Rp. 11,850.00
42 1 M3 PENGURUGAN DENGAN LIMESTONE Rp. 31,250.00
43 PASANGAN BUIS BETON DIAMETER 100 CM Rp. 37,432.50
44 1 M' PASANGAN BUIS BETON DIAMETER 100 CM Rp 74,865.00
45 PASANGAN BUIS BETON DIAMETER 80 CM Rp. 37,432.50
46 1 M' PASANGAN BUIS BETON DIAMETER 80 CM Rp. 74,865.00
47 PASANGAN BUIS BETON DIAMETER 50 CM Rp. 2,945.00
48 1 M' PASANGAN BUIS BETON DIAMETER 50 CM Rp 3,916.85
49 PASANGAN BUIS BETON DIAMETER 25 CM Rp. 2,945.00
50 1 M' PASANGAN BUIS BETON DIAMETER 25 CM Rp 3,916.85
51 1 M' PASANGAN1/2 BUIS BETON DIAMETER 25 CM Rp. 1,472.50
52 1 M' KANSTEIN SEGI LIMA (P:50:15,T:20)K-225 Rp 163,081.00
53 1 M' KANSTEIN KURSI K-225 Rp 159,746.00
DAFTAR HARGA SEWA ALAT BERAT
TAHUN 2020

HARGA
NO NAMA BARANG SATUAN
Rp
1 2 3 4

1 Asphalt Mixing Plant Jam


2 Asphalt Finisher Jam
3 Asphalt Sprayer Jam
4 Bulldozer 100-150 HP Jam
5 Compressor 4000-6500 L\M Jam
6 Concrete Mixer 0.3-0.6 M3 Jam
7 Mixer Kyukuto Hino Kapasitas 7 m3 / 25 hari
kerja / 200
jam
8 Mixer Kyukuto Hino Kapasitas 2,5 m3 / 25 hari
kerja / 200
jam
9 Crane 10-15 TON Jam
10 Dump Truck 3-4 M3 Jam
11 Dump Truck Jam
12 Excavator 80-140 HP Jam
13 Flat Bed Truck 3-4 M3 Jam
14 Generator Set Jam
15 Motor Grader >100 HP Jam
16 Track Loader 75-100 HP Jam
17 Wheel Loader 1.0-1.6 M3 Jam
18 Loader WA 200-1 / 25 hari
kerja / 200
jam
19 Sift Loader dengan Crane / Hiap Crane 8 ton / 8 jam
20 Sift Loader dengan Crane / Hiap Crane 5 ton / 8 jam
21 Dolly Scania 18 ton / 8 jam
22 Three Wheel Roller 6-8 T Jam
23 Tandem Roller 6-8 T. Jam
24 Tire Roller 8-10 T. Jam
25 Vibratory Roller 5-8 T. Jam
26 Concrete Vibrator Jam
27 Stone Crusher Jam
28 Water Pump 70-100 mm Jam
29 Water Tanker 3000-4500 L. Jam
30 Pedestrian Roller Jam
31 Tamper Jam
32 Jack Hammer Jam
33 Fulvi Mixer Jam
34 Concrete Pump Jam
35 Concrate Pump Standart IHI IPF 8E 21, 21 m / 25 hari
kerja / 200
jam
36 Concrate Pump Long Boom IHI IPF 8 N 29, 29 m / 25 hari
kerja / 200
jam
37 Concrate Pump Mini IHI IPN4N17, 17 m / 25 hari
kerja / 200
jam
38 Trailer 20 TON Jam
39 Pile Driver + Hammer Jam
40 Crane on Track 35 TON Jam
41 Welding Set Jam
42 Bore Pile Machine Jam
43 Asphalt Liquid Mixer Jam
44 Trailer Jam
45 Cold Milling Jam
46 Rock Drill Breaker Jam
47 Alat Stressing Jam
48 Alat Grouting Jam
49 Baro Mixer Jam
50 Bole Mixer Jam
51 Prenater Jam
52 Asphalt Cutter Jam
53 Concrete Pan Mixer Jam
54 Truck Mixer Jam
55 Blending Equipment Jam
56 Asphalt Distributor Jam
57 Crane Tadano Bulan
58 Crane Tadano Bulan
59 Crane Tadano Bulan
60 Crane Tadano Bulan
61 Crane Tadano Bulan
62 Crane Tadano Hari
63 Crane Tadano Hari
64 Crane Tadano Hari
65 Crane Tadano Hari
66 Crane Tadano Hari
67 Excavator PC.200-8 / MO Jam
68 Excavator PC.200-8 / MO Jam
69 Mobilisasi Excavator PC.200-8 (Denpasar, Kuta, Nusa Dua) LS
70 Excavator PC.78 UU (breaker) Jam
71 Excavator PC.78 UU (bucket) Jam
72 Mobilisasi Excavator PC.78 UU (Denpasar, Kuta, Nusa Dua) LS
73 Sewa TC Potain MC 205B made in Prancis, jib length 60 m Bulan
kapasitas 2,4 ton
74 Jaminan Angkur TC Potain MC 205B Set
75 Pasang Angkur TC Potain MC 205B Set
76 Erexsion TC Potain MC 205B Set
77 Dismantling Normal TC Potain MC 205B Set
78 Mob-Demob TC Potain MC 205B wilayah Bali Set
79 Gaji Operator TC Potain MC 205B / bulan
80 Sewa Mesin Bor Jam
81 Alat Bantu Pekerjaan Pengeboran Bored Pile LS
82 Batching Plant (di luar genset, listrik dan loader) / 1 bulan / 30
Hari

Catatan : Harga Belum Termasuk PPN dan Apabila dikemudian hari terdapat kekeliruan, akan dilakukan revisi /
penyesuaian

Anda mungkin juga menyukai