Anda di halaman 1dari 707

LAMPIRAN 1 : KEPUTUSAN WALIKOTA PONTIAN

NOMOR : …………………... T

TENTANG
STANDARISASI HARGA SATUAN BAHAN, UPAH DAN ANALI
BIAYA PEKERJAAN YANG TERDIRI DARI ANALISA E DAN ANA
BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN (ABK-SNI) K
TAHUN ANGGARAN 2010

( Periode Januari s/d Desember 2010 )

HARGA

TANPA
NO TENAGA KERJA SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

A. UPAH
1 Mandor Lapangan Org/hari L.061 60,500.00
2 Mekanik Org/hari L.071 60,500.00
3 Kepala Tukang Org/hari L.073 60,500.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 55,000.00
5 Operator terlatih Org/hari L.081 49,500.00
6 Operator semi terlatih Org/hari L.082 44,000.00
7 Sopir Org/hari L.091 49,500.00
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 44,000.00
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 49,500.00

NO MATERIAL SATUAN

B. BAHAN PENGISI
1 Batu Kong M³
2 Batu Sap Pinang M³
3 Batu pecah 15-20 cm M³
4 Batu pecah 10-15 cm M³
5 Batu pecah 5-7 cm M³
6 Batu pecah 3-5 cm M³
NO MATERIAL SATUAN

7 Batu pecah 2-3 cm M³


8 Batu pecah 1-2 cm M³
9 Batu pecah 1-1 cm M³
10 Batu pecah 0,5 cm M³
11 Stone Dust M³
12 Aspal Kg
13 Pasir M³
14 Semen PC Zak
15 Semen PC Kg
16 Tanah Ex. Peniraman M³
17 Tanah EX. Peladis M³
18 Paving Block Bh
19 Paving Stone Bh
20 Batu Bata 5 x 11 x 22cm Bh
21 Bataco 15 x 30 x 7 cm Bh
22 Bataco 20 x 40 x 9 cm ( press ) Bh
23 Bataco 20 x 40 x 7 cm ( press ) Bh
24 Kerawang ( roster ) 18 x 18 cm Bh
25 Kerawang press ( roster ) 30 x 30 cm Bh
26 Keramik 20 x 20 cm Kotak
27 Keramik 30 x 30 cm Kotak
28 Keramik 30 x 30 cm Unpolished Kotak
29 Keramik 30 x 30 cm Artistik Kotak
30 Keramik 40 x 40 cm (biasa) Kotak
31 Keramik 40 x 40 cm (anti gores) Kotak
32 Keramik 40 x 40 cm Unpolished Kotak
33 Keramik 60 x 60 cm (anti gores) Kotak
34 Granito 40 x 40 cm Kotak
35 Marmer M²
36 Wood Flooring M²
37 List Keramik WC. 8 x 20 cm Bh
38 Plint Kayu uk. 2 x 10 cm M1
39 Keramik dinding 20 x 20 cm Kotak
40 Keramik dinding 20 x 25 cm Kotak
41 Floor Hardener Kg
42 Beton Ready Mix B 0 M³
43 Beton Ready Mix 125 M³
44 Beton Ready Mix 175 M³
45 Beton Ready Mix 225 M³
46 Beton Ready Mix 300 M³
47 Additive Ready Mix M³
48 Karung Goni Curing Beton ( 0.7m² ) Gulung
NO MATERIAL SATUAN

49 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg
50 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg
51 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg
52 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg
53 Papan Turap Uk. 15/50 - 5m Kpg
54 Papan Turap Uk. 15/50 - 6m Kpg
55 Pemancangan Mini Pile - 6m Btg
56 Sewa Pompa Ready Mix (Min. 100 M³) M³
57 Bahan Plastik Cor Beton M²
NO MATERIAL SATUAN

C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³
4 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³
5 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³
6 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³
7 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³
8 Ky. Belian ketam Uk. 6/6 - 4 M M³
9 Ky. Belian ketam Uk. 7/7 - 4 M M³
10 Ky. Belian ketam Uk. 8/8 - 4 M M³
11 Ky. Belian ketam Uk. 5/10 - 4 M M³
12 Ky. Belian ketam Uk. 4/8 - 4 M M³
13 Papan belian ketam (4m) M³
14 Papan belian tdk ketam (4m) M³
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³
16 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³
17 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³
20 Kusen Ky Kelas I Bangkirai uk. 5/10 M³
21 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³
22 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³
23 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³
24 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³
25 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³
26 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³
27 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³
28 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³
29 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³
30 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³
31 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³
32 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³
33 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³
34 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³
35 Papan kayu klas II (mabang) tdk ketam M³
36 Papan kayu klas II (mabang) ketam M³
37 Papan kayu klas I tdk ketam M³
38 Papan kayu klas I ketam M³
39 Papan mal klas III M³
40 Papan Simpiran M³
NO MATERIAL SATUAN

41 Renglat kayu klas I uk 1/8 cm Btg


42 Kayu profil 10cm Btg
43 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg
44 Kayu cerucuk /dolken ø10 - Pj. 4 M Btg
45 Kayu cerucuk /dolken ø12 - Pj. 12 M Btg
46 Kayu cerucuk /dolken ø 15 - Pj. 12 M Btg
47 Kayu Simpiran / Bakar M³
48 Alas kayu hutan Btg

D. BAHAN CAT
1 Amplas Lbr
2 Minyak cat Kg
3 Cat kilat Kg
4 Plamur Kg
5 Cat dasar Kg
6 Cat tembok Kg
7 Cat tembok type weather shield Kg
8 Cat tembok type weather coat (acrylic) Kg
9 Cat seng Kg
10 Dempul Kg
11 Plitur Kg
12 Thiner Ltr
13 Thiner ND Ltr
14 Melamic Ltr
15 Vernis Ltr
16 Meni Kg
17 Oker Kg
18 Lem Kayu Kg
19 Sealent Tube
20 Soda Api Kg
21 Sabun / cream pembersih kotoran Kg
22 Teak Oil Ltr
23 Ter / Residu Ltr
24 Kuas 4" Bh
25 Road Line Paint ( Cat Marka ) Ltr
26 Glass Bit Kg
27 Weatherbond Emulsion ( cat kerb ) Kg
28 Termoplast Kg

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton Kg
2 Besi wire mesh ø 5 Kg
NO MATERIAL SATUAN

3 Kawat baja/bendrat Kg
4 Simpai roll Kg
5 Kawat simpai Kg
6 Baut dia 4/8 " pj = 20 cm Btg
7 Besi Penahan bh
8 Beugel plat L. 3 cm bh
9 Plat 1,2 x 2,4 x 12 Bh
10 Besi Konstruksi (I, H) Kg
11 Besi Konstruksi ( C ) Kg
12 Besi Konstruksi (siku ) Kg
13 Kawat Las Btg
NO MATERIAL SATUAN

14 Kawat Las Kg
15 Kawat harmonika M²
16 Kawat kasa M²
17 Pipa galvanis dia 3/4" Btg
18 Pipa galvanis dia 1/2" Btg
19 Pipa galvanis dia 1" Btg
20 Pipa galvanis dia 1 1/4" Btg
21 Pipa galvanis dia 1 1/2" Btg
22 Pipa galvanis dia 2" Btg
23 Pipa galvanis dia 3" Btg
24 Pipa galvanis dia 4" Btg
25 Folding gate M²
26 Rangka Aluminium 1 1/2" x 3" Meter
27 Rangka Aluminium 1 3/4" x 4" Meter
28 Pintu Aluminium std IKP, lengkap 4" Unit
29 Rangka Baja Ringan Zincalume (truss/color) + Pemasangan M²
30 Rangka Baja Ringan Zincalume (truss/polos) + Pemasangan M²
31 Alumatek Unit

F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC Bh
2 Kait angin Bh
3 Handle Jendela Bh
4 Handle Pintu Bh
5 Engsel jendela Bh
6 Engsel pintu Bh
7 Slot pintu Bh
8 Slot jendela Bh
9 Kunci tanam 2 slag (setaraf Belluci) Bh
10 Kunci tanam 1 slag Bh
11 Kunci tanam antik Bh
12 Kunci tanam biasa Bh
13 Kunci silinder Bh
14 Door Closer Bh
15 Door Stoper Bh
16 Paku Seng Kg
17 Paku campuran 1" - 5 " Kg
18 Paku beton Kg
19 Paku Atap Seng Kg
20 Paku triplek Kg
21 Paku GRC Kg
22 Paku Zincallume Kg
NO MATERIAL SATUAN

23 Sekrup Gypsum Kg
24 Sekrup Fixer Bh
25 Engsel Angin Bh

G. BAHAN ATAP
1 Sirap belian Lbr
2 Asbes Lbr
3 Eternit M²
4 Genteng Metal Type Prima 0.35 Lbr
5 Genteng Metal Type Royal 0.35 Lbr
6 Genteng Metal Type Classic 0.35 Lbr
7 Genteng Metal Stone ( Type Classic 0.35 ) Lbr
8 Genteng Metal Stone ( Type Prima 0.35 ) Lbr
9 Atap Metal Supersheet 0.35 (polos) M'
10 Atap Metal Supersheet 0.35 (polos) M²
11 Atap Trim Deck 0.3 (polos) M²
12 Atap Trim Deck 0.33 (color) M²
13 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh
14 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh
15 Nok bubungan genteng metal kotak 0.35 M'
16 Nok bubungan genteng metal stone kotak 0.35 M'
17 Nok bubungan Trim Deck (polos) M'
18 Nok bubungan Trim Deck (color) M'
19 Seng Gelombang Bjls 30 Lbr
20 Seng Gelombang Bjls 20 Lbr
21 Seng Plat Bjls 20 Lbr
22 Seng Plat Bjls 30 Lbr
23 Seng Plat Bjls 30 (lebar 45 cm) M'
24 Plat Datar Color 0.35 Lbr
25 Zincalume Gelombang Persegi 0.35 (polos) M²
26 Zincalume Gelombang Persegi 0.30 (polos) M²
27 Zincalume Gelombang Persegi 0.35 (color) M²
28 Zincalume Gelombang Persegi 0.30 (color) M²
29 Zincalume Plat 0.2 Lbr
30 Aluminium Foil M²

H. BAHAN KACA
1 Kaca Polos, t = 5 mm M²
2 Kaca Polos, t = 12mm M²
3 Kaca Rayben, t = 5 mm M²
4 Kaca Cermin t = 3mm M²
5 Kaca Patri M²
NO MATERIAL SATUAN

6 Sealent Kg
7 Nako + Bingkai (80 x 15) x 10 daun polos Bh
8 Nako + Bingkai (80 x 15) x 10 daun rayben Bh
9 Kaca Es M²

I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr
2 Triplek t = 6 mm Lbr
3 Triplek t =9 mm Lbr
4 Multiplek t = 10 mm Lbr
5 Multiplek t = 12 mm Lbr
NO MATERIAL SATUAN

6 Plywood 4' x 8' x 4mm Lbr


7 Panel GRC 120 x 240 x 40 Lbr
8 GypsumBoard t = 9mm Lbr

J. BAHAN SANITASI
1 Kloset duduk monoblok Bh
2 Kloset duduk putih (setaraf TOTO) Bh
3 Kloset duduk warna (setaraf TOTO) Bh
4 Kloset jongkok (setaraf TOTO) Bh
5 Kloset jongkok (setaraf INA) Bh
6 Kran air uk 1/2" Bh
7 Pipa paralon dia 1/2" Btg
8 Pipa paralon dia 3/4" Btg
9 Pipa paralon dia 1" Btg
10 Pipa paralon dia 2" Btg
11 Pipa paralon dia 3" Btg
12 Pipa paralon dia 4" Btg

K. BAHAN MINYAK (TANPA KEUNTUNGAN)


1 Minyak solar Ltr
2 Minyak solar industri Ltr
3 Bensin premium Ltr
4 Minyak pelumas Ltr
5 Oli BEO 154W40/Cat Ltr
6 Minyak tanah Ltr
7 Minyak tanah industri Ltr
8 Gas Elpiji Kg
9 Alat-alat bantu Set
10 Sewa Alat Untuk Pengelasan Jam
11 Sewa Molen Set
12 Sewa kuali termasuk angkutan Set

L. BAHAN ALAT-ALAT LISTRIK


1 Armatur lampu High Mass Holovent 400 watt (lengkap) Unit
2 Armatur lampu SGP 338 / SONT 400 Watt Unit
3 Armatur lampu SGP 328 / SONT 250 Watt Unit
4 Armatur lampu SGP 338 / SONT 400 Watt (lengkap) Unit
5 Armatur lampu SGP 368 / SONT 250 Watt (lengkap) Unit
6 Armatur lampu LVD 100 Watt (lengkap) Unit
7 Armatur lampu Ekorola TRX 800 - 20 Watt (set) Set
8 Armatur lampu Sorot HPIT 250 Watt (lengkap) Set
9 Sorot HPIT 250 watt (lengkap) Set
NO MATERIAL SATUAN

10 XKS SON T 250 watt (lengkap) Set


11 Tiang Artagonal Cabang 2 T = 11 M Tiang
12 Tiang Artagonal Cabang 1 T = 11 M Tiang
13 Tiang Oktagonal Cabang 2 T = 11 M Btg
14 Tiang Oktagonal Cabang 1 T = 11 M Btg
15 Tiang high mass 22 m cab. 5 ring Tiang
16 Tiang high mass 22 m cab. 4 ring Tiang
17 Tiang lampu oktagonal 11 m Btg
18 Tiang lampu oktagonal 12 m Btg
19 Tiang lampu oktagonal cab. 4 Ring 12 Mtr Btg
20 Tiang lampu oktagonal cab. 2 (11m) Btg
21 Stang Ornamen Galvanis dia 2" Pj. 7 M + Klem Tiang Btg
22 Stang Ornamen Galvanis dia 2" Pj. 6 M + Klem Tiang Btg
23 Stang Ornamen Galvanis dia 2" Pj. 5 M + Klem Tiang Btg
24 Stang Ornamen Galvanis dia 2" Pj. 3 M + Klem Tiang 12
25 Stang Ornamen Galvanis dia 2" Pj. 2 M + Klem Tiang Btg
26 Box Panel PJU Uk. 60x90x30 Cm lengkap Time Swich Set
27 Box Panel PJU Uk. 50x45x25 Cm lengkap Time Swich Set
28 Box KWH Meter Uk. 35 x 50 x 25 cm Buah
29 Traffo HPL 400 Watt Buah
30 Traffo HPL 250 Watt Buah
31 Traffo HPL 125 Watt Buah
32 Traffo SOX 135 Watt Buah
33 Traffo SOX 180 Watt Buah
34 Traffo SON T 400 Watt Buah
35 Traffo SON T 250 Watt Buah
36 Traffo SON T 125 Watt Buah
37 Traffo SON T 70 Watt Buah
38 Traffo SON H 400 Watt Buah
39 Traffo SON H 250 Watt Buah
40 Traffo SON H 125 Watt Buah
41 Traffo SON H 70 Watt Buah
42 Traffo HPiT 400 Buah
43 Traffo Neon 40 Watt Buah
44 Traffo Neon 20 Watt Buah
45 Traffo Neon 10 Watt Buah
46 HPL 400 Watt Buah
47 HPL 250 Watt Buah
48 HPL 125 Watt Buah
49 SOX 135 Watt Buah
50 SOX 180 Watt Buah
51 MLL 160 Watt Buah
NO MATERIAL SATUAN

52 Bola SON T 1000 Watt Buah


53 Bola SON T 400 Watt Buah
54 Bola SON T 250 Watt Buah
55 Bola SON T 125 Watt Buah
56 Bola Lampu SON 70 Watt Buah
57 SON H 400 Watt Buah
58 SON H 250 Watt Buah
59 SON H 125 Watt Buah
60 SON H 70 Watt Buah
NO MATERIAL SATUAN

61 Bola Lampu HPIT 400 Watt Buah


62 HPIT 400 Watt Buah
63 Seri 200 Biji Kotak
64 Seri Kuning Kotak
65 Neon Sen Meter
66 Pijar 5 Watt Buah
67 Pijar 20 Watt Buah
68 Pijar 25 Watt Buah
69 Pijar 40 Watt Buah
70 Pijar 60 Watt Buah
71 Pijar 75 Watt Buah
72 Pijar 80 Watt Buah
73 Pijar 100 Watt Buah
74 Pijar 200 Watt Buah
75 Neon 40 Watt Buah
76 Neon 20 Watt Buah
77 Neon 10 Watt Buah
78 Lampu Ekorola TRX 800 - 20 watt (set) Set
79 Lampu Light Grick Buah
80 Lampu Genite 16 Watt Buah
81 Lampu XL 14 Watt Buah
82 Lampu Sorot 300 Watt Buah
83 Lampu Nepalos 25 Watt Buah
84 Lampu Superlox 25 Watt Buah
85 Lampu Superlox 40 Watt Buah
86 Lampu Fisikom 25 Watt Buah
87 Lampu Fisikom 23 Watt Buah
88 Lampu Fisikom 18 Watt Buah
89 Lampu Mercury 125 Watt Buah
90 Lampu Mercury 250 Watt Buah
91 Lampu Sunyco 45 Watt Buah
92 Lampu Matsuka 8 Watt Buah
93 Lampu Matsuka 14 Watt Buah
94 Lampu Matsuka 18 Watt Buah
95 Lampu Matsuka 20 Watt Buah
96 Lampu Matsuka 25 Watt Buah
97 Lampu Par 38 Watt Buah
98 Lampu Taman Buah
99 SL 15 Watt Buah
100 SL 18 Watt Buah
101 SL 25 Watt Buah
102 TL Rina 32 Watt Buah
NO MATERIAL SATUAN

103 Bola Essetial Buah


104 Bola Spot Light Buah
105 Bola Lampu Sorot 300 Watt Buah
106 Hologen 500 Watt Buah
107 Hologen 1.000 Watt Buah
108 Hologen 1.500 Watt Buah
109 NYY 1 x 1.5 mm Meter
110 NYY 1 x 2.5 mm Meter
111 NYY 1 x 4 mm Meter
112 NYY 1 x 6 mm Meter
113 NYY 2 mm Meter
114 NYY 2 x 2.5 mm Meter
115 NYY 2 x 4 mm Meter
116 NYY 2 x 6 mm Meter
117 NYY 2 x 10 mm Meter
118 NYY 3 x 4 mm Meter
119 NYY 4 x 2.5 mm Meter
120 NYY 4 x 4 mm Meter
121 NYY 4 x 6 mm Meter
122 NYY 4 x 10 mm Meter
123 NYY 4 x 16 mm Meter
124 NYY 4 x 25 mm Meter
125 NYY 4 x 35 mm Meter
126 NYY 4 x 50 mm Meter
127 NYY 4 x 70 mm Meter
128 NYYFYGBY 4 x 6 mm Meter
129 NYYFYGBY 4 x 10 mm Meter
130 NYN 2 x 2,5 mm Meter
131 NYN 3 x 1,5 mm Meter
132 NYN 3 x 2,5 mm Meter
133 NYA 1 x 1,5 mm Meter
134 NYA 1 x 2,5 mm Meter
135 NYA 1 x 4 mm Meter
136 NYA 1 x 6 mm Meter
137 NYA 2 x 2,5 mm Meter
138 NYA 2 x 4 mm Meter
139 NYA 2 x 30 mm Meter
140 NYA 4 x 6 mm Meter
141 NYA 1,5 mm Meter
142 NYA 4 mm Meter
143 NYA 10 mm Meter
144 NYA 16 mm Meter
NO MATERIAL SATUAN

145 NYF6BY 4 x 10 mm Meter


146 NYF6BY 4 x 16 mm Meter
147 NYF6BY 4 x 25 mm Meter
148 NYF6BY 4 x 35 mm Meter
149 NYF6BY 4 x 50 mm Meter
150 NYF6BY 4 x 70 mm Meter
151 NYM 4 mm Meter
152 NYM 3 x 4 mm Meter
153 NYM 2 x 2 mm Meter
154 NYM 2 x 4 mm Meter
NO MATERIAL SATUAN

155 NYM 2 x 2,5 mm Meter


156 NYM 2 x 1,5 mm Meter
157 NYM 3 x 1,5 mm Meter
158 NYM 3 x 2,5 mm Meter
159 NYM 3 x 10 mm Meter
160 NYM 4 x 2,5 mm Meter
161 NYM 4 x 4 mm Meter
162 NYMHYM 2 x 0,75 mm Meter
163 NYMHYM 2 x 1,5 mm Meter
164 Traffo SON T 1000 Watt Buah
165 Traffo SON T 400 Watt Buah
166 Traffo SON T 250 Watt Buah
167 Traffo SON T 70 Watt Buah
168 Kabel Snur Roll
169 Kabel Tester Meter
170 Kabel Box Meter
171 Kabel Mic Transparan Roll
172 Kabel 3 x 2,5 mm Meter
173 Kabel Antena Roll
174 Kabel H / M Meter
175 Kabel Transparan Meter
176 Kabel Telepon Meter
177 Kabel TC 2 x 10 mm Meter
178 Kabel TC 2 x 16 mm Meter
179 Box TL 20 Watt Buah
180 Box MCB 1 Group Buah
181 Cal Gulung Buah
182 Contactor 100 A Buah
183 Conector Buah
184 Dop 3" Buah
185 Esensial Buah
186 Fitting Gantung Buah
187 Fitting Duduk Buah
188 Fitting Atom Buah
189 Fitting Gantung E 27 Buah
190 Fitting Duduk E 27 Buah
191 Fitting Duduk E 40 Buah
192 Fitting Hologen Buah
193 Full Breket Buah
194 Gulung Spul Buah
195 Gulung Coil Contactor Buah
196 Isolasi Unibel Buah
NO MATERIAL SATUAN

197 Icnitor SN 58 Buah


198 Inector Buah
199 Ignator Buah
200 Indiktor Buah
201 Insuluk Buah
202 Kapasitor Buah
203 Kap Hijau E 27 Buah
204 Kap Hijau E 40 Buah
205 Kap Lampu Buah
206 Kap To2 Buah
207 Kop Skring Buah
208 Klem Tiang Buah
209 k. Skum 10-8 Buah
210 MCB 1.A Buah
211 MCB 2.A Buah
212 MCB 25 A Buah
213 MCB 63 A Buah
214 MCB 40 A Buah
215 MCB 45 A Buah
216 MCB 50 A Buah
217 MCB 10 A Buah
218 MCB 16 A Buah
219 MCB 6 A Buah
220 MCB 2 A Buah
221 MCB 4 A Buah
222 MCB 32 A Buah
223 MCB Box Buah
224 Multi Tester Buah
225 MC Se-3 N Buah
226 Macon Mec gmg-50 aC Buah
227 Magnetic Contactor 100 A Buah
228 NH Fuse 80 A Buah
229 Ornamen Pijar Buah
230 Ornamen Gantung Buah
231 Obeng Plus Buah
232 Obeng Minus Buah
233 Open Steker Buah
234 On - Off Buah
235 Pat 38 Buah
236 Solar Seal / Photo Seal Buah
237 Opstic 1/2" lengkap klem Batang
238 Pipa Paralon 1/2" Batang
NO MATERIAL SATUAN

239 Pipa L 1/2" Batang


240 Pipa Paralon 1' Batang
241 Pipa Paralon 3/4" Batang
242 Pipa Paralon 3' Batang
243 Pipa PVC 1,5" Batang
244 Pipa PVC Galvanis 1,5" Batang
245 Pipa Besi Batang
246 Pipa Galvanis Batang
247 Pipa ornamen dia 2" x 2m Batang
248 Pipa ornamen dia 2" x 3m lengkap klem Batang
249 Pipa ornamen dia 2" x 6m lengkap klem Batang
NO MATERIAL SATUAN

250 Pipa ornamen dia 2" x 7m lengkap klem Batang


251 Pondasi tiang lampu oktagonal (11 meter) Unit
252 Pres Conector Buah
253 Rangka Ring 32 Watt Buah
254 Rel MCB Buah
255 Roset Telpon Buah
256 Saklar Double Buah
257 Saklar Engkel Buah
258 Saklar Tripel Buah
259 Spul Contactor Buah
260 Sekring 63 A Buah
261 Solder Pistol Buah
262 Solder Buah
263 Solar Seal / Photo Seal Buah
264 Stop Kontak Buah
265 Steker Arde Buah
266 Steker T Buah
267 Steker PH Buah
268 Sadel No. 6 Bungkus
269 Sadel No. 8 Bungkus
270 Sadel No. 9 Bungkus
271 Sadel No. 10 Bungkus
272 Sadel No. 12 Bungkus
273 Sadel No. 14 Bungkus
274 Sadel No. 19 Bungkus
275 Sadel No. 22 Bungkus
276 Skun RS-16 Buah
277 Stater Buah
278 Ston 63 A Buah
279 Stost 40 A + Ip Buah
280 Stost 32 A + Ip Buah
281 Tedus Hitam Buah
282 Tali Tester Buah
283 Tang Amper Buah
284 Tang Buaya Buah
285 Tang Potong Buah
286 Tang Kombinasi Buah
287 Tang Jepit Buah
288 Tang Skun Buah
289 Time Swicht Theben Buah
290 Taping Buah
291 Taping Conector 1 baut Buah
292 Taping Conector 2 baut Buah
293 Tespen Buah
294 Timah Solder Buah
NO MATERIAL SATUAN

295 Terminal 25 ml Buah


296 Tolkit Buah
297 Wedge Klem Buah
298 Wide Klem Buah
299 WD 40 Buah
300 Klem Tiang uk. 5" s/d 8" x 2" Set

M. ALAT-ALAT PEMADAM KEBAKARAN


1 Helm pemadam kebakaran Buah
2 Baju tahan panas Buah
3 Baret lengkap Buah
4 Celana tahan api Buah
5 Sepatu pemadam Pasang
6 Sarung tangan Pasang
7 Chainsaw Buah
8 Dahrem Buah
9 Handy Talky Buah
10 Tali pengaman Buah
11 Kapak Pemadam Buah
12 Kopel rem Buah
13 Y Connection 1.5" Buah
14 Y Connection 2.5" Buah
15 Pilar Hydrant Unit
16 Nozzle multi spray jet 1.5' Buah
17 Nozzle multi spray jet 2.5' Buah
18 Selang pemadan uk. 1.5 " x 20m
Roll
+ Machino Coupling
19 Selang pemadan uk. 2.5 " x 20m
Roll
+ Machino Coupling
20 Tac stick (alat pendeteksi kebocoran listrik) Buah
21 Hydrant tester (alat ukur hydrant)
22 Tabung pernapasan
Unit
(continued breathing aparatus)
23 Floating Pump (pompa apung) Unit
24 Hydrant Pillar Two Way 2,5" Machino Unit
25 Tabung Apar 3 Kg Unit
26 Tabung Apar 6 Kg Unit
27 Sepeda Motor 110 cc Unit
28 Sepeda Motor (Modifikasi) Unit
29 Repiter Unit
30 Mesin DF (Daug Feng) Unit
31 Pump Niagara Unit

WAKIL WALIKOTA
NO MATERIAL SATUAN

Untuk salinan sesuai dengan bunyi aslinya


SEKRETARIS DAERAH KOTA PONTIANAK

Ir. H. TONI HERIANTO, MT


Pembina Utama Muda
NIP. 19541129 198003 1 016
KEPUTUSAN WALIKOTA PONTIANAK
NOMOR : …………………... TAHUN 2010

TENTANG
SATUAN BAHAN, UPAH DAN ANALISA
TERDIRI DARI ANALISA E DAN ANALISA
UNG DAN PERUMAHAN (ABK-SNI) KOTA PONTIANAK
UN ANGGARAN 2010

anuari s/d Desember 2010 )

HARGA

HARGA TERMASUK
KEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD)
(Rp) (Rp)

6,050.00 66,550.00
6,050.00 66,550.00
6,050.00 66,550.00
5,500.00 60,500.00
4,950.00 54,450.00
4,400.00 48,400.00
4,950.00 54,450.00
4,400.00 48,400.00
4,950.00 54,450.00

HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.101 192,500.00
- 215,050.00
- 230,230.00
M.020 246,070.00
M.022 271,060.00
M.023 290,700.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.024 327,030.00
M.025 373,580.00
- 394,900.00
M.026 394,900.00
- 371,360.00
- 9,900.00
M.040 58,370.00
M.080 70,400.00
- 1,400.00
M.050.a 115,060.00
M.050 220,000.00
- 2,200.00
- 3,630.00
- 2,530.00
- 990.00
- 2,530.00
- 2,310.00
- 3,300.00
- 26,400.00
- 50,120.00
- 40,030.00
- 54,450.00
- 64,130.00
- 71,390.00
- 96,250.00
- 98,450.00
- 277,200.00
- 189,420.00
- 453,750.00
- 275,000.00
- 242,000.00
- 46,750.00
- 50,380.00
- 54,890.00
- 8,250.00
- 792,000.00
- 830,500.00
- 880,000.00
- 1,017,500.00
- 1,094,500.00
- 44,000.00
- 11,550.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 1,155,000.00
- 1,485,000.00
- 990,000.00
- 1,105,500.00
- 880,000.00
- 1,122,000.00
- 138,050.00
- 55,000.00
- 3,850.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 9,736,320.00
- 11,463,540.00
- 9,063,230.00
M.181.a 9,350,550.00
M.181.b 7,903,940.00
- 8,116,350.00
- 7,370,770.00
- 8,934,750.00
- 11,892,210.00
- 10,771,200.00
- 10,771,200.00
- 9,453,120.00
M.181.e 16,958,370.00
M.181.d 15,074,070.00
M.181.f 6,660,170.00
M.181.g 11,297,220.00
- 4,630,120.00
- 6,033,170.00
- 11,550,000.00
- 82,500.00
M.181.h 2,194,720.00
M.181.i 3,293,620.00
- 3,724,160.00
- 3,168,550.00
- 2,764,960.00
- 1,883,750.00
- 3,053,270.00
- 3,244,010.00
- 3,949,990.00
- 4,109,820.00
- 2,520,870.00
- 4,947,360.00
- 962,500.00
- 2,046,110.00
M.181.j 4,541,790.00
M.181.k 6,331,160.00
- 9,052,120.00
- 7,562,500.00
M.181.l 1,323,520.00
- 604,780.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 19,360.00
- 20,680.00
- 5,630.00
- 10,450.00
- 66,000.00
- 82,500.00
- 181,500.00
- 16,500.00

- 2,310.00
- 27,940.00
- 42,130.00
- 29,480.00
- 33,000.00
- 36,520.00
- 40,260.00
- 80,080.00
- 42,900.00
- 27,940.00
- 39,160.00
M.090.f 22,990.00
- 32,450.00
- 56,540.00
- 30,910.00
- 44,220.00
- 55,820.00
- 20,400.00
- 137,500.00
- 11,660.00
- 20,350.00
- 44,000.00
- 25,300.00
- 17,710.00
M.090.e 49,500.00
M.090.g 36,520.00
M.090.h 79,200.00
- 34,100.00

M.167 15,510.00
- 17,710.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

M.168 18,700.00
- 20,900.00
- 26,620.00
M.163 8,250.00
- 11,550.00
- 38,500.00
- 445,500.00
- 17,930.00
- 18,590.00
- 18,590.00
- 5,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 110,000.00
- 27,500.00
- 13,750.00
- 148,610.00
- 121,880.00
- 191,510.00
- 269,830.00
- 312,730.00
- 384,450.00
- 614,350.00
- 437,580.00
- 550,000.00
- 82,500.00
- 105,600.00
- 2,392,500.00
- 253,000.00
- 165,000.00
- 2,090,000.00

- 302,500.00
- 14,850.00
- 16,500.00
- 110,000.00
- 24,750.00
- 33,000.00
- 20,350.00
- 11,550.00
- 184,250.00
- 118,250.00
- 179,020.00
- 86,900.00
- 107,250.00
- 123,750.00
- 22,000.00
M.166.a 24,530.00
M.166.b 20,900.00
- 27,500.00
M.166.c 27,500.00
- 28,870.00
- 28,870.00
- 38,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 66,000.00
- 330.00
- 11,000.00

- 5,500.00
- 55,000.00
- 71,500.00
- 69,630.00
- 69,630.00
- 67,320.00
- 88,880.00
- 88,880.00
- 93,500.00
- 116,930.00
- 104,530.00
- 117,420.00
- 71,500.00
- 88,000.00
- 85,360.00
- 101,200.00
- 114,400.00
- 128,700.00
- 71,390.00
- 51,370.00
- 52,800.00
- 71,500.00
- 20,900.00
- 60,500.00
- 114,120.00
- 100,370.00
- 127,870.00
- 114,120.00
- 130,900.00
- 55,000.00

- 109,450.00
- 422,400.00
- 146,300.00
- 156,750.00
- 1,045,000.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 111,650.00
- 214,500.00
- 225,500.00
- 167,200.00

- 60,500.00
- 133,100.00
- 165,000.00
- 187,000.00
- 222,200.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 109,340.00
- 64,900.00
- 67,100.00

- 1,705,000.00
- 2,145,000.00
- 2,343,000.00
- 204,600.00
- 137,500.00
- 38,500.00
- 17,820.00
- 27,670.00
- 40,700.00
- 61,820.00
- 117,150.00
- 154,000.00

M.183 4,500.00
- 5,750.00
M.184 5,600.00
M.185 24,200.00
- 42,400.00
M.064 5,100.00
- 6,100.00
- 8,300.00
M.170 57,000.00
- 62,500.00
- 150,000.00
- 63,300.00

13,167,000.00
- 5,458,530.00
- 3,724,980.00
- 5,105,100.00
- 4,274,980.00
- 4,939,000.00
- 544,500.00
- 6,675,900.00
- 5,563,250.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 3,599,750.00
- 7,754,900.00
- 6,805,880.00
- 7,237,010.00
- 7,601,000.00
- 67,217,150.00
- 80,659,700.00
- 10,838,520.00
- 12,362,130.00
- 10,838,300.00
- 11,388,300.00
- 983,010.00
- 982,980.00
- 915,200.00
- 682,000.00
- 517,000.00
- 4,664,000.00
- 3,376,170.00
- 797,500.00
- 249,700.00
- 202,030.00
- 124,850.00
- 842,870.00
- 842,870.00
- 459,430.00
- 374,360.00
- 248,320.00
- 144,550.00
- 409,290.00
- 280,950.00
- 248,320.00
- 148,220.00
- 270,500.00
- 19,610.00
- 16,360.00
- 14,390.00
- 202,950.00
- 148,310.00
- 70,210.00
- 485,550.00
- 485,550.00
- 70,210.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 742,500.00
- 336,600.00
- 324,500.00
- 248,320.00
- 168,520.00
- 280,950.00
- 280,950.00
- 248,320.00
- 140,430.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 336,600.00
- 324,610.00
- 55,450.00
- 55,450.00
- 41,620.00
- 2,100.00
- 3,480.00
- 3,480.00
- 3,480.00
- 4,950.00
- 4,950.00
- 3,940.00
- 6,230.00
- 13,840.00
- 13,100.00
- 9,070.00
- 5,220.00
- 538,080.00
- 131,810.00
- 41,610.00
- 34,650.00
- 137,500.00
- 34,650.00
- 5,500.00
- 6,230.00
- 34,650.00
- 34,650.00
- 27,770.00
- 70,210.00
- 148,220.00
- 83,230.00
- 20,800.00
- 22,180.00
- 31,900.00
- 37,490.00
- 38,860.00
- 51,330.00
- 34,650.00
- 115,500.00
- 44,990.00
- 58,190.00
- 27,680.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 33,360.00
- 51,970.00
- 137,500.00
- 40,240.00
- 79,100.00
- 90,100.00
- 2,970.00
- 4,620.00
- 7,260.00
- 11,220.00
- 6,140.00
- 12,210.00
- 17,500.00
- 16,610.00
- 21,900.00
- 23,740.00
- 23,430.00
- 34,650.00
- 56,260.00
- 76,560.00
- 65,900.00
- 273,350.00
- 305,250.00
- 374,550.00
- 134,560.00
- 86,680.00
- 127,930.00
- 6,500.00
- 5,950.00
- 7,880.00
- 2,970.00
- 4,620.00
- 7,260.00
- 11,220.00
- 12,210.00
- 17,600.00
- 12,280.00
- 22,820.00
- 1,370.00
- 3,570.00
- 8,700.00
- 2,380.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 60,500.00
- 88,270.00
- 122,100.00
- 155,370.00
- 199,740.00
- 271,970.00
- 3,570.00
- 19,700.00
- 5,950.00
- 14,660.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 10,170.00
- 4,400.00
- 5,500.00
- 7,880.00
- 27,680.00
- 10,080.00
- 25,480.00
- 3,110.00
- 5,310.00
- 929,500.00
- 551,320.00
- 449,240.00
- 173,470.00
- 55,450.00
- 27,680.00
- 55,450.00
- 180,300.00
- 7,880.00
- 34,650.00
- 2,010.00
- 2,750.00
- 1,650.00
- 7,090.00
- 9,900.00
- 8,250.00
- 4,120.00
- 55,450.00
- 1,106,050.00
- 7,970.00
- 6,960.00
- 34,650.00
- 1,460.00
- 3,480.00
- 27,770.00
- 17,440.00
- 17,440.00
- 22,110.00
- 27,770.00
- 12,500.00
- 69,390.00
- 69,390.00
- 4,950.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 99,880.00
- 83,230.00
- 55,500.00
- 130,160.00
- 320.00
- 156,200.00
- 27,500.00
- 44,000.00
- 97,070.00
- 97,070.00
- 4,190.00
- 11,130.00
- 840.00
- 13,880.00
- 13,880.00
- 13,880.00
- 124,850.00
- 52,700.00
- 52,700.00
- 235,620.00
- 68,000.00
- 34,650.00
- 34,650.00
- 13,880.00
- 34,650.00
- 34,650.00
- 3,480.00
- 62,420.00
- 911,620.00
- 499,490.00
- 1,327,260.00
- 25,000.00
- 48,560.00
- 48,560.00
- 19,610.00
- 19,610.00
- 2,090.00
- 6,270.00
- 52,020.00
- 124,850.00
- 229,070.00
- 7,650.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 2,090.00
- 9,020.00
- 8,340.00
- 16,680.00
- 43,490.00
- 149,990.00
- 83,230.00
- 97,120.00
- 438,530.00
- 569,430.00
- 1,145,370.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 1,276,270.00
- 1,439,900.00
- 2,810.00
- 13,840.00
- 20,800.00
- 4,900.00
- 6,280.00
- 4,300.00
- 16,680.00
- 55,450.00
- 9,020.00
- 305,250.00
- 20,800.00
- 124,850.00
- 4,190.00
- 8,340.00
- 9,710.00
- 2,810.00
- 980.00
- 1,300.00
- 1,440.00
- 3,850.00
- 4,950.00
- 2,810.00
- 4,190.00
- 8,370.00
- 980.00
- 2,810.00
- 124,880.00
- 52,750.00
- 34,680.00
- 710.00
- 20,800.00
- 901,900.00
- 27,750.00
- 27,750.00
- 27,750.00
- 27,750.00
- 277,500.00
- 592,180.00
- 457,870.00
- 10,690.00
- 17,440.00
- 6,920.00
- 20,800.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

- 34,690.00
- 62,420.00
- 4,190.00
- 6,420.00
- 34,690.00
- 192,500.00

- 630,850.00
- 7,150,000.00
- 55,000.00
- 6,050,000.00
- 550,000.00
- 366,850.00
- 8,800,000.00
- 66,000.00
- 2,750,000.00
- 165,000.00
- 330,000.00
- 49,500.00
- 4,950,000.00
- 5,500,000.00
- 5,390,000.00
- 8,250,000.00
- 8,800,000.00

- 3,025,000.00

- 3,245,000.00

- 10,560,000.00
- 9,680,000.00

- 17,875,000.00

- 91,208,370.00
- 5,225,000.00
- 733,330.00
- 1,100,000.00
- 11,000,000.00
- 17,416,660.00
- 38,700,470.00
- 5,500,000.00
- 9,533,330.00

WAKIL WALIKOTA PONTIANAK


HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

TERTANDA

PARYADI, S.Hut

salinan sesuai dengan bunyi aslinya


TARIS DAERAH KOTA PONTIANAK

Ir. H. TONI HERIANTO, MT


Pembina Utama Muda
NIP. 19541129 198003 1 016
3.2.1 HARGA SATUAN PEKERJAAN PONDASI
3.2.1.1 Pemasangan 1 m³ pondasi batu belah campuran 1SP:3PP

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.500 #REF!
2 Tukang L.02 OH 0.750 #REF!
3 Kepala Tukang L.03 OH 0.075 #REF!
4 Mandor L.04 OH 0.075 #REF!
JUMLAH TENAGA KERJA
B BAHAN
1 Batu Belah m³ 1.200 #REF!
2 Semen Portland Kg 202.000 #REF!
3 Pasir Pasang m³ 0.485 #REF!
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
REKAPITULASI BIAYA PEKERJAAN
KEGIATAN :
PEKERJAAN :
SUB PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

NO. URAIAN PEKERJAAN SUB TOTAL

1 2 3
A PEKERJAAN PENDAHULUAN 60,135,238.50

B PEKERJAAN PONDASI 1,178,627,165.04

C PEKERJAAN STRUKTUR
I Sloof Uk. 35x60 cm 10,730,626.80
II Err:509 Err:509
III Err:509 Err:509
IV Err:509 101,646,235.07

D Err:509 Err:509

JUMLAH TOTAL
PPN 10 %
JUMLAH TOTAL + PPN 10 %
ASI BIAYA PEKERJAAN

JUMLAH SUB
TOTAL

60,135,238.50

1,178,627,165.04

Err:509

Err:509
Err:509
Err:509
Err:509
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

KEGIATAN :
PEKERJAAN :
SUB PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

KODE
NO URAIAN PEKERJAAN VOLUME SAT ANALISA

1 2 3 4 5
A. PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank 138.000 M' 2.2.1.4.a
2 Pembongkaran 1.000 Lsm
3 Pagar Sementara 118.500 M'
Sub Total A
B. PEKERJAAN PONDASI
1 Pengadaan Mini Pile 20 x 20 528.000 Btg
2 Pemancangan Mini Pile 20 x 20 528.000 Btg
3 Pembobokan 176.000 Titik
4 Galian Tanah Pondasi 66.413 M³ 2.3.1.1
5 Urugan Pasir t = 15 cm 6.316 M³ 2.3.1.11
6 Lantai Kerja t = 5 cm 3.248 M³ 4.1.1.4
7 Poer Type P1
- Beton Ready Mix K-300 3.240 M³ B.13.i.2
- Tulangan U32 411.840 Kg 4.1.1.17.b
- Bekisting Pondasi 21.600 M² 4.1.1.20.a
8 Poer Type P2
- Beton Ready Mix K-300 0.864 M³ B.13.i.2
- Tulangan U32 93.184 Kg 4.1.1.17.b
- Bekisting Pondasi 4.320 M² 4.1.1.20.a
9 Poer Type P3
- Beton Ready Mix K-300 8.748 M³ B.13.i.2
- Tulangan U32 570.024 Kg 4.1.1.17.b
- Bekisting Pondasi 19.440 M² 4.1.1.20.a
10 Poer Type P4
- Beton Ready Mix K-300 6.048 M³ B.13.i.2
- Tulangan U32 529.984 Kg 4.1.1.17.b
- Bekisting Pondasi 20.160 M² 4.1.1.20.a
11 Poer Type P5
- Beton Ready Mix K-300 21.446 M³ B.13.i.2
- Tulangan U32 1,775.072 Kg 4.1.1.17.b
- Bekisting Pondasi 59.160 M² 4.1.1.20.a
12 Kolom Pondasi Uk. 35/35 cm
- Beton K-225 3.026 M³ 4.1.1.7.a
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA

1 2 3 4 5
- Tulangan U32 763.648 Kg 4.1.1.17.b
- Tulangan U24 36.024 Kg 4.1.1.17.a
- Bekisting Pondasi 20.368 M² 4.1.1.20.a
13 Kolom Pondasi Uk. 35/75 cm
- Beton K-225 0.171 M³ 4.1.1.7.a
- Tulangan U32 35.168 Kg 4.1.1.17.b
- Tulangan U24 1.580 Kg 4.1.1.17.a
- Bekisting Pondasi 0.980 M² 4.1.1.20.a
Sub Total B
C PEKERJAAN STRUKTUR
I ELEVASI -0,75 M
1 Sloof Uk. 25/55 cm
- Beton K-225 0.928 M³ 4.1.1.7.a
- Tulangan U32 177.600 Kg 4.1.1.17.b
- Tulangan U24 32.074 Kg 4.1.1.17.a
- Bekisting Sloof 9.488 M² 4.1.1.21.b
2 Sloof Uk. 20/40 cm
- Beton K-225 0.800 M³ 4.1.1.7.a
- Tulangan U32 92.238 Kg 4.1.1.17.b
- Tulangan U24 28.045 Kg 4.1.1.17.a
- Bekisting Sloof 10.000 M² 4.1.1.21.b
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA

1 2 3 4 5
II ELEVASI + 0,00 M
1 Sloof Uk. 25/55 cm
- Beton K-225 36.110 M³ 4.1.1.7.a
- Tulangan U32 6,073.920 Kg 4.1.1.17.b
- Tulangan U24 1,269.688 Kg 4.1.1.17.a
- Bekisting Sloof 369.121 M² 4.1.1.21.b
2 Sloof Uk. 20/45 cm
- Beton K-225 12.611 M³ 4.1.1.7.a
- Tulangan U32 1,808.640 Kg 4.1.1.17.b
- Tulangan U24 533.566 Kg 4.1.1.17.a
- Bekisting Sloof 162.135 M² 4.1.1.21.b
3 Sloof Uk. 20/40 cm
- Beton K-225 2.586 M³ 4.1.1.7.a
- Tulangan U32 355.213 Kg 4.1.1.17.b
- Tulangan U24 116.130 Kg 4.1.1.17.a
- Bekisting Sloof 34.480 M² 4.1.1.21.b
4 Sloof Uk. 15/30 cm
- Beton K-225 0.258 M³ 4.1.1.7.a
- Tulangan U32 40.102 Kg 4.1.1.17.b
- Tulangan U24 16.590 Kg 4.1.1.17.a
- Bekisting Sloof 4.725 M² 4.1.1.21.b
5 Tutup Kolong Uk. 10/30 cm
- Beton Ready Mix K-225 1.972 M³ 4.1.1.7.a
- Wiremesh M6 54.999 Kg 4.1.1.19
- Bekisting Sloof 39.430 M² 4.1.1.21.b
6 Plat Lantai t = 10 cm
- Beton Ready Mix K-225 79.918 M³ 4.1.1.7.a
- Wiremesh 4,293.601 Kg 4.1.1.19
- Urugan Pasir t = 65 cm Err:509 M² 2.3.1.11
7 Kolom Beton Bertulang Type K1 Uk. 35/35 cm
- Beton K-225 23.410 M³ 4.1.1.7.a
- Tulangan U32 2,461.760 Kg 4.1.1.17.b
- Tulangan U24 97.720 Kg 4.1.1.17.a
- Bekisting Kolom Berulang 250.633 M² 4.1.1.22.b
8 Kolom Beton Bertulang Type K1 Uk. 35/75 cm
- Beton K-225 1.024 M³ 4.1.1.7.a
- Tulangan U32 101.108 Kg 4.1.1.17.b
- Tulangan U24 18.960 Kg 4.1.1.17.a
- Bekisting Kolom 8.130 M² 4.1.1.22.a
10 Kolom Praktis Uk. 9/9 cm
- Beton K-175 3.323 M³ 4.1.1.5.a
- Tulangan U24 1,126.540 Kg 4.1.1.17.a
- Bekisting Sloof Berulang 93.465 M² 4.1.1.21.c
11 Balok Praktis Uk. 9/9 cm
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA

1 2 3 4 5
- Beton K-175 2.659 M³ 4.1.1.5.a
- Tulangan U24 901.232 Kg 4.1.1.17.a
- Bekisting Sloof 74.772 M² 4.1.1.21.b
12 Tangga Type 1
a. Galian Tanah 1.800 M³ 2.3.1.1
b. Urugan Pasir 0.360 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm + Pemancangan 30.000 Btg
d.Pondasi
- Beton K-225 0.738 M³ 4.1.1.7.a
- Tulangan U24 28.470 Kg 4.1.1.17.a
- Bekisting Sloof 4.800 M² 4.1.1.21.b
e.Tapak Tangga
- Beton K-225 1.332 M³ 4.1.1.7.a
- Tulangan U24 227.840 Kg 4.1.1.17.a
- Wiremesh M6 11.052 Kg 4.1.1.19
- Bekisting Sloof 10.200 M² 4.1.1.21.b
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA

1 2 3 4 5
12 Tangga Type 2
a. Galian Tanah 2.400 M³ 2.3.1.1
b. Urugan Pasir 0.480 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm + Pemancangan 40.000 Btg
d.Pondasi
- Beton K-225 0.984 M³ 4.1.1.7.a
- Tulangan U24 49.662 Kg 4.1.1.17.a
- Bekisting Sloof 6.400 M² 4.1.1.21.b
e.PlatTangga
- Beton K-225 1.776 M³ 4.1.1.7.a
- Tulangan U24 302.511 Kg 4.1.1.17.a
- Wiremesh M6 14.736 Kg 4.1.1.19
- Bekisting Sloof 13.600 M² 4.1.1.21.b
13 Tangga Type 3
a. Kolom Beton Bertulang Type KT Uk. 20/20 cm
- Beton K-225 0.080 M³ 4.1.1.7.a
- Tulangan U32 12.560 Kg 4.1.1.17.b
- Tulangan U24 2.607 Kg 4.1.1.17.a
- Bekisting Kolom 1.555 M² 4.1.1.22.a
b. Balok Bordes Uk. 15/30 cm
- Beton K-225 0.123 M³ 4.1.1.7.a
- Tulangan U32 12.480 Kg 4.1.1.17.b
- Tulangan U24 5.254 Kg 4.1.1.17.a
- Bekisting Balok 2.044 M² 4.1.1.23.b
c.Tangga
- Beton K-225 1.919 M³ 4.1.1.7.a
- Tulangan U24 186.900 Kg 4.1.1.17.b
- Wiremesh M6 63.319 Kg 4.1.1.19
- Bekisting Balok 11.400 M² 4.1.1.23.b
13 Tangga Type 4
a. Kolom Beton Bertulang Type KT Uk. 20/20 cm
- Beton K-225 0.080 M³ 4.1.1.7.a
- Tulangan U32 12.560 Kg 4.1.1.17.b
- Tulangan U24 2.607 Kg 4.1.1.17.a
- Bekisting Kolom 1.555 M² 4.1.1.22.a
b. Balok Bordes Uk. 15/30 cm
- Beton K-225 0.123 M³ 4.1.1.7.a
- Tulangan U32 12.480 Kg 4.1.1.17.b
- Tulangan U24 5.254 Kg 4.1.1.17.a
- Bekisting Balok 2.044 M² 4.1.1.23.b
c.Tangga
- Beton K-225 1.919 M³ 4.1.1.7.a
- Tulangan U24 186.900 Kg 4.1.1.17.b
- Wiremesh M6 63.319 Kg 4.1.1.19
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA

1 2 3 4 5
- Bekisting Balok 11.400 M² 4.1.1.23.b
12 Ramp Type 1
a. Galian Tanah 2.695 M³ 2.3.1.1
b. Urugan Pasir Bawah Pondasi 0.490 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm 24.000 Btg -
d.Pondasi
- Beton K-225 3.442 M³ 4.1.1.7.a
- Tulangan U24 252.809 Kg 4.1.1.17.a
- Bekisting Sloof 12.132 M² 4.1.1.21.b
e. Urugan Pasir Bawah Ramp 1.950 M³ 2.3.1.11
f. Ramp
- Beton K-225 0.581 M³ 4.1.1.7.a
- Wiremesh M6 59.420 Kg 4.1.1.19
12 Ramp Type 2
a. Galian Tanah 2.695 M³ 2.3.1.1
b. Urugan Pasir Bawah Pondasi 0.490 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm 24.000 Btg -
d.Pondasi
- Beton K-225 3.442 M³ 4.1.1.7.a
- Tulangan U24 252.809 Kg 4.1.1.17.a
- Bekisting Sloof 12.132 M² 4.1.1.21.b
e. Urugan Pasir Bawah Ramp 1.950 M³ 2.3.1.11
f. Ramp
- Beton K-225 0.581 M³ 4.1.1.7.a
- Wiremesh M6 59.420 Kg 4.1.1.19
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA

1 2 3 4 5
12 Ramp Type 3
a. Galian Tanah 2.695 M³ 2.3.1.1
b. Urugan Pasir Bawah Pondasi 0.490 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm 24.000 Btg -
d.Pondasi
- Beton K-225 3.442 M³ 4.1.1.7.a
- Tulangan U24 252.809 Kg 4.1.1.17.a
- Bekisting Sloof 12.132 M² 4.1.1.21.b
e. Urugan Pasir Bawah Ramp 1.950 M³ 2.3.1.11
f. Ramp
- Beton K-225 0.581 M³ 4.1.1.7.a
- Wiremesh M6 59.420 Kg 4.1.1.19
12 Ramp Type 4
a. Galian Tanah 2.695 M³ 2.3.1.1
b. Urugan Pasir Bawah Pondasi 0.490 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm 24.000 Btg -
d.Pondasi
- Beton K-225 3.442 M³ 4.1.1.7.a
- Tulangan U24 252.809 Kg 4.1.1.17.a
- Bekisting Sloof 12.132 M² 4.1.1.21.b
e. Urugan Pasir Bawah Ramp 1.950 M³ 2.3.1.11
f. Ramp
- Beton K-225 0.581 M³ 4.1.1.7.a
- Wiremesh 59.420 Kg 4.1.1.19

III ELEVASI 4,00 M


1 Balok Lantai Uk. 25/55 cm
- Beton K-225 31.205 M³ 4.1.1.7.a
- Tulangan U32 5,283.600 Kg 4.1.1.17.b
- Tulangan U24 1,023.050 Kg 4.1.1.17.a
- Bekisting Balok 318.981 M² 4.1.1.23.b
2 Balok Lantai Uk. 20/45 cm
- Beton K-225 9.238 M³ 4.1.1.7.a
- Tulangan U32 1,318.800 Kg 4.1.1.17.b
- Tulangan U24 382.360 Kg 4.1.1.17.a
- Bekisting Balok 118.778 M² 4.1.1.23.b
3 Balok Lantai Uk. 20/40 cm
- Beton K-225 1.883 M³ 4.1.1.7.a
- Tulangan U32 265.330 Kg 4.1.1.17.b
- Tulangan U24 82.950 Kg 4.1.1.17.a
- Bekisting Balok 25.100 M² 4.1.1.23.b
4 Balok Lantai Uk. 15/30 cm
- Beton K-225 0.315 M³ 4.1.1.7.a
- Tulangan U32 48.922 Kg 4.1.1.17.b
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA

1 2 3 4 5
- Tulangan U24 15.761 Kg 4.1.1.17.a
- Bekisting Balok 5.767 M² 4.1.1.23.b
5 Plat Lantai t = 10 cm
- Beton K-225 66.193 M³ 4.1.1.7.a
- Wiremesh 4,064.220 Kg 4.1.1.19
- Bekisting Lantai Err:509 M² 4.1.1.24.b
6 Kolom Beton Bertulang Type K1 Uk. 35/35 cm
- Beton K-225 5.255 M³ 4.1.1.7.a
- Tulangan U32 552.640 Kg 4.1.1.17.b
- Tulangan U24 125.136 Kg 4.1.1.17.a
- Bekisting Kolom Berulang 187.255 M² 4.1.1.22.b
10 Kolom Beton Bertulang Type K2 Uk. 35/75 cm
- Beton K-225 1.313 M³ 4.1.1.7.a
- Tulangan U32 101.108 Kg 4.1.1.17.b
- Tulangan U24 23.700 Kg 4.1.1.17.a
- Bekisting Kolom Berulang 10.550 M² 4.1.1.22.b
11 Kolom Praktis Uk. 9/9 cm
- Beton K-175 3.996 M³ 4.1.1.7.a
- Tulangan U24 1,050.621 Kg 4.1.1.17.a
- Bekisting Sloof Berulang 88.803 M² 4.1.1.21.c
12 Balok Praktis Uk. 9/9 cm
- Beton K-175 3.197 M³ 4.1.1.7.a
- Tulangan U24 840.497 Kg 4.1.1.17.a
- Bekisting Sloof Berulang 71.042 M² 4.1.1.21.c
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA

1 2 3 4 5
IV ELEVASI 8,80 DAN 9,00
1 Ring Balok Uk. 25/55 cm
- Beton K-225 5.108 M³ 4.1.1.7.a
- Tulangan U32 710.400 Kg 4.1.1.17.b
- Tulangan U24 137.144 Kg 4.1.1.17.a
- Bekisting Balok Berulang 50.153 M² 4.1.1.22.b
2 Ring Balok Uk. 20/45 cm
- Beton K-225 9.932 M³ 4.1.1.7.a
- Tulangan U32 918.450 M³ 4.1.1.17.b
- Tulangan U24 319.792 M³ 4.1.1.17.a
- Bekisting Balok Berulang 121.385 M³ 4.1.1.22.b
3 Ring Balok Uk. 9/9 cm
- Beton K-175 0.972 M³ 4.1.1.7.a
- Tulangan U24 194.506 Kg 4.1.1.17.a
- Bekisting Sloof Berulang 21.600 M² 4.1.1.21.c

Sub Total D
D PEKERJAAN ATAP
I Elevasi +4,00
1 Balok Dak Uk. 30/65 cm
- Beton K-225 1.997 M³ 4.1.1.7.a
- Tulangan U32 239.760 Kg 4.1.1.17.b
- Tulangan U24 56.406 Kg 4.1.1.17.a
- Bekisting Balok Berulang 16.940 M² 4.1.1.23.b
2 Balok Dak Uk. 25/55 cm
- Beton K-225 3.288 M³ 4.1.1.7.a
- Tulangan U32 564.768 Kg 4.1.1.17.b
- Tulangan U24 107.835 Kg 4.1.1.17.a
- Bekisting Balok Berulang 33.609 M² 4.1.1.23.b
3 Balok Dak Uk. 20/40cm
- Beton K-225 3.236 M³ 4.1.1.7.a
- Tulangan U32 466.683 Kg 4.1.1.17.b
- Tulangan U24 142.200 Kg 4.1.1.17.a
- Bekisting Balok Berulang 43.140 M² 4.1.1.23.b
4 Balok Dak Uk. 15/40 cm
- Beton K-225 0.488 M³ 4.1.1.7.a
- Tulangan U32 45.136 Kg 4.1.1.17.b
- Tulangan U24 25.952 Kg 4.1.1.17.a
- Bekisting Balok Berulang 8.138 M² 4.1.1.23.b
5 Plat Dak t = 10 cm
- Beton K-225 13.630 M³ 4.1.1.7.a
- Wiremesh 732.285 Kg 4.1.1.19
- Bekisting Lantai Berulang Err:509 M² 4.1.1.24.b
II ELEVASI 8,00 M
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA

1 2 3 4 5
1 Balok Dak Uk. 25/55 cm
- Beton K-225 13.258 M³ 4.1.1.7.a
- Tulangan U32 2,259.960 Kg 4.1.1.17.b
- Tulangan U24 434.658 Kg 4.1.1.17.a
- Bekisting Balok Berulang 135.528 M² 4.1.1.23.b
2 Balok Dak Uk. 25/55 cm + Dinding Paraped
- Beton K-225 0.369 M³ 4.1.1.7.a
- Tulangan U32 44.400 Kg 4.1.1.17.b
- Tulangan U24 9.401 Kg 4.1.1.17.a
- Wiremesh M6 1.151 4.1.1.19
- Bekisting Balok Berulang 3.875 M² 4.1.1.23.b
3 Balok Dak Uk. 20/45 cm
- Beton K-225 3.101 M³ 4.1.1.7.a
- Tulangan U32 368.950 Kg 4.1.1.17.b
- Tulangan U24 128.612 Kg 4.1.1.17.a
- Bekisting Balok Berulang 39.870 M² 4.1.1.23.b
4 Balok Dak Uk. 20/45 cm + Dinding Paraped
- Beton K-225 2.540 M³ 4.1.1.7.a
- Tulangan U32 215.875 Kg 4.1.1.17.b
- Tulangan U24 73.865 Kg 4.1.1.17.a
- Wiremesh M6 11.697 4.1.1.19
- Bekisting Balok Berulang 33.020 M² 4.1.1.23.b
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA

1 2 3 4 5
5 Balok Dak Uk. 15/40 cm
- Beton K-225 0.619 M³ 4.1.1.7.a
- Tulangan U32 62.400 Kg 4.1.1.17.b
- Tulangan U24 33.773 Kg 4.1.1.17.a
- Bekisting Balok Berulang 10.313 M² 4.1.1.23.b
6 Plat Dak t = 10 cm
- Beton K-225 22.138 M³ 4.1.1.7.a
- Wiremesh M6 1,189.337 Kg 4.1.1.19
- Bekisting Lantai Berulang 186.945 M² 4.1.1.24.b
7 Kolom Praktis Uk. 9/9 cm
- Beton K-175 0.252 M³ 4.1.1.7.a
- Tulangan U24 66.123 Kg 4.1.1.17.a
- Bekisting Sloof 5.589 M² 4.1.1.21.c
8 Rangka Baja Ringan Zincalume 680.400 M² 8.1.1.3
9 Atap Zincallum Gelombang Persegi 0,35 680.400 M² 4.5.2.41.b
10 Perabung Plat 75.546 M' 4.5.2.39.
11 Lisplank Wood Plank 98.600 M' 8.1.1.4
Sub Total D
JUMLAH TOTAL PEKERJAAN STRUKTUR
JUMLAH TOTAL PPN 10 %
JUMLAH TOTAL PEKERJAAN STRUKTUR + PPN 10 %
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

:
:
N :
:
ARAN :
Ko
ns
ult
KODE HARGA SATUAN
RAIAN PEKERJAAN VOLUME SAT SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
PENDAHULUAN
Bowplank 138.000 M' 2.2.1.4.a 65,488.50 9,037,413.00:
an 1.000 Lsm 15,000,000.00 15,000,000.00PT
tara 118.500 M' 304,623.00 36,097,825.50.
A
Sub Total A R
PONDASI S
ini Pile 20 x 20 528.000 Btg 1,760,000.00 929,280,000.00E
K
n Mini Pile 20 x 20 528.000 Btg 120,000.00 63,360,000.00O
176.000 Titik 40,000.00 7,040,000.00N
Pondasi 66.413 M³ 2.3.1.1 90,612.50 6,017,802.66K
t = 15 cm 6.316 M³ 2.3.1.11 141,845.00 895,893.02H
AT
= 5 cm 3.248 M³ 4.1.1.4 996,598.84 3,236,454.72UL
IS
ady Mix K-300 3.240 M³ B.13.i.2 1,682,037.50 5,449,801.50TI
W
n U32 411.840 Kg 4.1.1.17.b 18,317.75 7,543,982.16A
g Pondasi 21.600 M² 4.1.1.20.a 135,487.00 2,926,519.20R
E
ady Mix K-300 0.864 M³ B.13.i.2 1,682,037.50 1,453,280.40KA
YA
n U32 93.184 Kg 4.1.1.17.b 18,317.75 1,706,921.22S
g Pondasi 4.320 M² 4.1.1.20.a 135,487.00 585,303.84A
W
ady Mix K-300 8.748 M³ B.13.i.2 1,682,037.50 14,714,464.05ak
tu
n U32 570.024 Kg 4.1.1.17.b 18,317.75 10,441,557.13Pe
g Pondasi 19.440 M² 4.1.1.20.a 135,487.00 2,633,867.28lak
sa
na
ady Mix K-300 6.048 M³ B.13.i.2 1,682,037.50 10,172,962.80an
n U32 529.984 Kg 4.1.1.17.b 18,317.75 9,708,114.42
g Pondasi 20.160 M² 4.1.1.20.a 135,487.00 2,731,417.92:
16
7
ady Mix K-300 21.446 M³ B.13.i.2 1,682,037.50 36,072,135.21Ha
n U32 1,775.072 Kg 4.1.1.17.b 18,317.75 32,515,325.13ri
g Pondasi 59.160 M² 4.1.1.20.a 135,487.00 8,015,410.92Ka
le
si Uk. 35/35 cm nd
225 3.026 M³ 4.1.1.7.a 1,244,365.64 3,765,139.34er
M
ul
:
16
Ko
7
ns
Ha
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN ri
SUB TOTAL (Rp.) an
ANALISA (Rp.) KaJUM
Pe
le
ng
nd
2 3 4 5 6 7 aw
er
as
n U32 763.648 Kg 4.1.1.17.b 18,317.75 13,988,313.15M
n U24 36.024 Kg 4.1.1.17.a 16,585.25 597,467.05ul
:
ai
g Pondasi 20.368 M² 4.1.1.20.a 135,487.00 2,759,531.47PT
Ke
.
si Uk. 35/75 cm rja
A
225 0.171 M³ 4.1.1.7.a 1,244,365.64 212,319.89R
n U32 35.168 Kg 4.1.1.17.b 18,317.75 644,198.63S:
n U24 1.580 Kg 4.1.1.17.a 16,585.25 26,204.70E18
K
g Pondasi 0.980 M² 4.1.1.20.a 135,487.00 132,777.26Jul
O
Sub Total B i 1
N
20
STRUKTUR K
16
5M H
Ko
AT
55 cm ntr
UL
ak
225 0.928 M³ 4.1.1.7.a 1,244,365.64 1,154,926.86IS
tor
n U32 177.600 Kg 4.1.1.17.b 18,317.75 3,253,232.40TI
Pe
W
n U24 32.074 Kg 4.1.1.17.a 16,585.25 531,955.31lak
A
g Sloof 9.488 M² 4.1.1.21.b 135,487.00 1,285,432.91sa
R
na
40 cm E
225 0.800 M³ 4.1.1.7.a 1,244,365.64 995,492.51KA
:
YA
n U32 92.238 Kg 4.1.1.17.b 18,317.75 1,689,583.47PT
S
n U24 28.045 Kg 4.1.1.17.a 16,585.25 465,133.34.A
G
g Sloof 10.000 M² 4.1.1.21.b 135,487.00 1,354,870.00WU
ak
10,730,626.80N tu
A
Pe
K
lak
A
sa
R
na
YA
an
N
U
:
S
16
A
7
NT
Ha
A
ri
R
Ka
A
le
ks
nd
o
er
M
ul
ai
Ke
rja

:
18
Jul
PT
i
.
20
K
16
R
Ko
E
ntr
A
lak
sa
na
Ko
:ns
ult
PT
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) an
ANALISA (Rp.) . JUM
Pe
G
ng
U
2 3 4 5 6 7 aw
N
as
A
00 M
K
55 cm :A
225 36.110 M³ 4.1.1.7.a 1,244,365.64 44,933,654.44PT R
.
n U32 6,073.920 Kg 4.1.1.17.b 18,317.75 111,260,548.08YA
A
N
n U24 1,269.688 Kg 4.1.1.17.a 16,585.25 21,058,092.90R
U
g Sloof 369.121 M² 4.1.1.21.b 135,487.00 50,011,130.80S S
45 cm E
A
K
225 12.611 M³ 4.1.1.7.a 1,244,365.64 15,692,072.92NT O
A
n U32 1,808.640 Kg 4.1.1.17.b 18,317.75 33,130,215.36N R
n U24 533.566 Kg 4.1.1.17.a 16,585.25 8,849,325.50K A
g Sloof 162.135 M² 4.1.1.21.b 135,487.00 21,967,184.75H ks
AT
o
40 cm UL
225 2.586 M³ 4.1.1.7.a 1,244,365.64 3,217,929.55IS
n U32 355.213 Kg 4.1.1.17.b 18,317.75 6,506,693.77TI
W
n U24 116.130 Kg 4.1.1.17.a 16,585.25 1,926,045.08A
g Sloof 34.480 M² 4.1.1.21.b 135,487.00 4,671,591.76R
30 cm E
225 0.258 M³ 4.1.1.7.a 1,244,365.64 320,673.03KA
YA
n U32 40.102 Kg 4.1.1.17.b 18,317.75 734,585.74S
n U24 16.590 Kg 4.1.1.17.a 16,585.25 275,149.30A PT
g Sloof 4.725 M² 4.1.1.21.b 135,487.00 640,108.33W .
ak
K
Uk. 10/30 cm
tu
R
ady Mix K-225 1.972 M³ 4.1.1.7.a 1,244,365.64 2,453,266.86Pe E
h M6 54.999 Kg 4.1.1.19 13,993.65 769,637.46lakA
g Sloof 39.430 M² 4.1.1.21.b 135,487.00 5,342,252.41SI sa
na
N
= 10 cm an
D
ady Mix K-225 79.918 M³ 4.1.1.7.a 1,244,365.64 99,447,368.86O
h 4,293.601 Kg 4.1.1.19 13,993.65 60,083,153.35:P
asir t = 65 cm Err:509 M² 2.3.1.11 141,845.00 Err:509 16
U
7
T
Bertulang Type K1 Uk. 35/35 cm Ha
R
225 23.410 M³ 4.1.1.7.a 1,244,365.64 29,130,288.57ri A
n U32 2,461.760 Kg 4.1.1.17.b 18,317.75 45,093,904.24Ka B
le
n U24 97.720 Kg 4.1.1.17.a 16,585.25 1,620,707.98A nd
N
g Kolom Berulang 250.633 M² 4.1.1.22.b 224,636.50 56,301,207.59er G
Bertulang Type K1 Uk. 35/75 cm M
S
225 1.024 M³ 4.1.1.7.a 1,244,365.64 1,273,919.33A ul
ai
n U32 101.108 Kg 4.1.1.17.b 18,317.75 1,852,071.07Ke
n U24 18.960 Kg 4.1.1.17.a 16,585.25 314,456.34rja
g Kolom 8.130 M² 4.1.1.22.a 300,916.00 2,446,447.08
s Uk. 9/9 cm
:
175 3.323 M³ 4.1.1.5.a 1,173,609.45 3,900,138.9318
n U24 1,126.540 Kg 4.1.1.17.a 16,585.25 18,683,947.54Jul
g Sloof Berulang 93.465 M² 4.1.1.21.c 121,107.25 11,319,289.12i
20
Uk. 9/9 cm 16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
175 2.659 M³ 4.1.1.5.a 1,173,609.45 3,120,111.14
n U24 901.232 Kg 4.1.1.17.a 16,585.25 14,947,158.03:
g Sloof 74.772 M² 4.1.1.21.b 121,107.25 9,055,431.30PT
.
1
A
ah 1.800 M³ 2.3.1.1 90,612.50 163,102.50R
ir 0.360 M³ 2.3.1.11 141,845.00 51,064.20S
a 8 - 400 cm + Pemancangan 30.000 Btg 15,000.00 450,000.00E
K
O
225 0.738 M³ 4.1.1.7.a 1,244,365.64 918,341.84N
n U24 28.470 Kg 4.1.1.17.a 16,585.25 472,182.07K
g Sloof 4.800 M² 4.1.1.21.b 135,487.00 650,337.60H
AT
ga UL
225 1.332 M³ 4.1.1.7.a 1,244,365.64 1,657,495.03IS
n U24 227.840 Kg 4.1.1.17.a 16,585.25 3,778,783.36TI
W
h M6 11.052 Kg 4.1.1.19 13,993.65 154,657.82A
g Sloof 10.200 M² 4.1.1.21.b 135,487.00 1,381,967.40R
E
KA
YA
S
A
W
ak
tu
Pe
lak
sa
na
an

:
16
7
Ha
ri
Ka
le
nd
er
M
ul
ai
Ke
rja

:
18
Jul
i
20
16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
2
ah 2.400 M³ 2.3.1.1 90,612.50 217,470.00:
ir 0.480 M³ 2.3.1.11 141,845.00 68,085.60PT
a 8 - 400 cm + Pemancangan 40.000 Btg 15,000.00 600,000.00.
A
R
225 0.984 M³ 4.1.1.7.a 1,244,365.64 1,224,455.79S
n U24 49.662 Kg 4.1.1.17.a 16,585.25 823,656.69E
K
g Sloof 6.400 M² 4.1.1.21.b 135,487.00 867,116.80O
N
225 1.776 M³ 4.1.1.7.a 1,244,365.64 2,209,993.38K
n U24 302.511 Kg 4.1.1.17.a 16,585.25 5,017,220.56H
AT
h M6 14.736 Kg 4.1.1.19 13,993.65 206,210.43UL
g Sloof 13.600 M² 4.1.1.21.b 135,487.00 1,842,623.20IS
3 TI
W
on Bertulang Type KT Uk. 20/20 cm A
225 0.080 M³ 4.1.1.7.a 1,244,365.64 99,549.25R
n U32 12.560 Kg 4.1.1.17.b 18,317.75 230,070.94E
n U24 2.607 Kg 4.1.1.17.a 16,585.25 43,237.75KA
YA
g Kolom 1.555 M² 4.1.1.22.a 300,916.00 467,924.38S
es Uk. 15/30 cm A
225 0.123 M³ 4.1.1.7.a 1,244,365.64 152,590.34W
n U32 12.480 Kg 4.1.1.17.b 18,317.75 228,605.52ak
tu
n U24 5.254 Kg 4.1.1.17.a 16,585.25 87,130.61Pe
g Balok 2.044 M² 4.1.1.23.b 228,085.00 466,148.72lak
sa
na
225 1.919 M³ 4.1.1.7.a 1,244,365.64 2,388,248.76an
n U24 186.900 Kg 4.1.1.17.b 16,585.25 3,099,783.23
h M6 63.319 Kg 4.1.1.19 13,993.65 886,060.43:
g Balok 11.400 M² 4.1.1.23.b 228,085.00 2,600,169.0016
7
4 Ha
on Bertulang Type KT Uk. 20/20 cm ri
225 0.080 M³ 4.1.1.7.a 1,244,365.64 99,549.25Ka
le
n U32 12.560 Kg 4.1.1.17.b 18,317.75 230,070.94nd
n U24 2.607 Kg 4.1.1.17.a 16,585.25 43,237.75er
g Kolom 1.555 M² 4.1.1.22.a 300,916.00 467,924.38M
es Uk. 15/30 cm ul
ai
225 0.123 M³ 4.1.1.7.a 1,244,365.64 152,590.34Ke
n U32 12.480 Kg 4.1.1.17.b 18,317.75 228,605.52rja
n U24 5.254 Kg 4.1.1.17.a 16,585.25 87,130.61
g Balok 2.044 M² 4.1.1.23.b 228,085.00 466,148.72
:
18
225 1.919 M³ 4.1.1.7.a 1,244,365.64 2,388,248.76Jul
n U24 186.900 Kg 4.1.1.17.b 16,585.25 3,099,783.23i
20
h M6 63.319 Kg 4.1.1.19 13,993.65 886,060.4316
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
g Balok 11.400 M² 4.1.1.23.b 228,085.00 2,600,169.00
:
ah 2.695 M³ 2.3.1.1 90,612.50 244,200.69PT
ir Bawah Pondasi 0.490 M³ 2.3.1.11 141,845.00 69,504.05.
A
a 8 - 400 cm 24.000 Btg - 15,000.00 360,000.00R
S
225 3.442 M³ 4.1.1.7.a 1,244,365.64 4,283,448.74E
K
n U24 252.809 Kg 4.1.1.17.a 16,585.25 4,192,899.64O
g Sloof 12.132 M² 4.1.1.21.b 135,487.00 1,643,728.28N
ir Bawah Ramp 1.950 M³ 2.3.1.11 141,845.00 276,597.75K
H
AT
225 0.581 M³ 4.1.1.7.a 1,244,365.64 722,540.91UL
h M6 59.420 Kg 4.1.1.19 13,993.65 831,500.58IS
TI
W
ah 2.695 M³ 2.3.1.1 90,612.50 244,200.69A
ir Bawah Pondasi 0.490 M³ 2.3.1.11 141,845.00 69,504.05R
a 8 - 400 cm 24.000 Btg - 15,000.00 360,000.00E
KA
YA
225 3.442 M³ 4.1.1.7.a 1,244,365.64 4,283,448.74S
n U24 252.809 Kg 4.1.1.17.a 16,585.25 4,192,899.64A
g Sloof 12.132 M² 4.1.1.21.b 135,487.00 1,643,728.28W
ir Bawah Ramp 1.950 M³ 2.3.1.11 141,845.00 276,597.75ak
tu
Pe
225 0.581 M³ 4.1.1.7.a 1,244,365.64 722,540.91lak
h M6 59.420 Kg 4.1.1.19 13,993.65 831,500.58sa
na
an

:
16
7
Ha
ri
Ka
le
nd
er
M
ul
ai
Ke
rja

:
18
Jul
i
20
16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as

ah 2.695 M³ 2.3.1.1 90,612.50 244,200.69:


ir Bawah Pondasi 0.490 M³ 2.3.1.11 141,845.00 69,504.05PT
a 8 - 400 cm 24.000 Btg - 15,000.00 360,000.00.
A
R
225 3.442 M³ 4.1.1.7.a 1,244,365.64 4,283,448.74S
n U24 252.809 Kg 4.1.1.17.a 16,585.25 4,192,899.64E
K
g Sloof 12.132 M² 4.1.1.21.b 135,487.00 1,643,728.28O
ir Bawah Ramp 1.950 M³ 2.3.1.11 141,845.00 276,597.75N
K
225 0.581 M³ 4.1.1.7.a 1,244,365.64 722,540.91H
AT
h M6 59.420 Kg 4.1.1.19 13,993.65 831,500.58UL
IS
ah 2.695 M³ 2.3.1.1 90,612.50 244,200.69TI
W
ir Bawah Pondasi 0.490 M³ 2.3.1.11 141,845.00 69,504.05A
a 8 - 400 cm 24.000 Btg - 15,000.00 360,000.00R
E
225 3.442 M³ 4.1.1.7.a 1,244,365.64 4,283,448.74KA
YA
n U24 252.809 Kg 4.1.1.17.a 16,585.25 4,192,899.64S
g Sloof 12.132 M² 4.1.1.21.b 135,487.00 1,643,728.28A
ir Bawah Ramp 1.950 M³ 2.3.1.11 141,845.00 276,597.75W
ak
tu
225 0.581 M³ 4.1.1.7.a 1,244,365.64 722,540.91Pe
h 59.420 Kg 4.1.1.19 13,993.65 831,500.58lak
Err:509sa
na
0M an
Uk. 25/55 cm
225 31.205 M³ 4.1.1.7.a 1,244,365.64 38,830,040.97:
n U32 5,283.600 Kg 4.1.1.17.b 18,317.75 96,783,663.9016
7
n U24 1,023.050 Kg 4.1.1.17.a 16,585.25 16,967,540.01Ha
g Balok 318.981 M² 4.1.1.23.b 228,085.00 72,754,838.41ri
Uk. 20/45 cm Ka
le
225 9.238 M³ 4.1.1.7.a 1,244,365.64 11,495,760.89nd
n U32 1,318.800 Kg 4.1.1.17.b 18,317.75 24,157,448.70er
n U24 382.360 Kg 4.1.1.17.a 16,585.25 6,341,536.19M
g Balok 118.778 M² 4.1.1.23.b 228,085.00 27,091,366.09ul
ai
Uk. 20/40 cm Ke
225 1.883 M³ 4.1.1.7.a 1,244,365.64 2,342,518.32rja
n U32 265.330 Kg 4.1.1.17.b 18,317.75 4,860,248.61
n U24 82.950 Kg 4.1.1.17.a 16,585.25 1,375,746.49
:
g Balok 25.100 M² 4.1.1.23.b 228,085.00 5,724,933.5018
Uk. 15/30 cm Jul
225 0.315 M³ 4.1.1.7.a 1,244,365.64 391,415.21i
20
n U32 48.922 Kg 4.1.1.17.b 18,317.75 896,133.6416
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
n U24 15.761 Kg 4.1.1.17.a 16,585.25 261,391.83
g Balok 5.767 M² 4.1.1.23.b 228,085.00 1,315,309.17:
= 10 cm PT
225 66.193 M³ 4.1.1.7.a 1,244,365.64 82,367,672.71.
A
h 4,064.220 Kg 4.1.1.19 13,993.65 56,873,265.21R
g Lantai Err:509 M² 4.1.1.24.b 253,676.50 Err:509 S
Bertulang Type K1 Uk. 35/35 cm E
K
225 5.255 M³ 4.1.1.7.a 1,244,365.64 6,539,452.54O
n U32 552.640 Kg 4.1.1.17.b 18,317.75 10,123,121.36N
n U24 125.136 Kg 4.1.1.17.a 16,585.25 2,075,411.84K
g Kolom Berulang 187.255 M² 4.1.1.22.b 224,636.50 42,064,307.81H
AT
Bertulang Type K2 Uk. 35/75 cm UL
225 1.313 M³ 4.1.1.7.a 1,244,365.64 1,633,229.90IS
n U32 101.108 Kg 4.1.1.17.b 18,317.75 1,852,071.07TI
W
n U24 23.700 Kg 4.1.1.17.a 16,585.25 393,070.43A
g Kolom Berulang 10.550 M² 4.1.1.22.b 224,636.50 2,369,915.08R
s Uk. 9/9 cm E
175 3.996 M³ 4.1.1.7.a 1,173,609.45 4,689,901.80KA
YA
n U24 1,050.621 Kg 4.1.1.17.a 16,585.25 17,424,811.94S
g Sloof Berulang 88.803 M² 4.1.1.21.c 121,107.25 10,754,687.12A
Uk. 9/9 cm W
175 3.197 M³ 4.1.1.7.a 1,173,609.45 3,751,921.44ak
tu
n U24 840.497 Kg 4.1.1.17.a 16,585.25 13,939,849.55Pe
g Sloof Berulang 71.042 M² 4.1.1.21.c 121,107.25 8,603,749.70lak
Err:509sa
na
an

:
16
7
Ha
ri
Ka
le
nd
er
M
ul
ai
Ke
rja

:
18
Jul
i
20
16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
0 DAN 9,00
k. 25/55 cm :
225 5.108 M³ 4.1.1.7.a 1,244,365.64 6,356,375.24PT
n U32 710.400 Kg 4.1.1.17.b 18,317.75 13,012,929.60.
A
n U24 137.144 Kg 4.1.1.17.a 16,585.25 2,274,567.53R
g Balok Berulang 50.153 M² 4.1.1.22.b 224,636.50 11,266,082.07S
k. 20/45 cm E
K
225 9.932 M³ 4.1.1.7.a 1,244,365.64 12,358,417.37O
n U32 918.450 M³ 4.1.1.17.b 18,317.75 16,823,937.49N
n U24 319.792 M³ 4.1.1.17.a 16,585.25 5,303,830.27K
g Balok Berulang 121.385 M³ 4.1.1.22.b 224,636.50 27,267,501.55H
AT
k. 9/9 cm UL
175 0.972 M³ 4.1.1.7.a 1,173,609.45 1,140,748.39IS
n U24 194.506 Kg 4.1.1.17.a 16,585.25 3,225,928.98TI
W
g Sloof Berulang 21.600 M² 4.1.1.21.c 121,107.25 2,615,916.60A
101,646,235.07R
Sub Total D E
ATAP KA
YA
0 S
. 30/65 cm A
225 1.997 M³ 4.1.1.7.a 1,244,365.64 2,484,376.00W
n U32 239.760 Kg 4.1.1.17.b 18,317.75 4,391,863.74ak
tu
n U24 56.406 Kg 4.1.1.17.a 16,585.25 935,507.61Pe
g Balok Berulang 16.940 M² 4.1.1.23.b 228,085.00 3,863,759.90lak
. 25/55 cm sa
na
225 3.288 M³ 4.1.1.7.a 1,244,365.64 4,091,240.91an
n U32 564.768 Kg 4.1.1.17.b 18,317.75 10,345,279.03
n U24 107.835 Kg 4.1.1.17.a 16,585.25 1,788,470.43:
g Balok Berulang 33.609 M² 4.1.1.23.b 228,085.00 7,665,651.7416
7
. 20/40cm Ha
225 3.236 M³ 4.1.1.7.a 1,244,365.64 4,026,145.03ri
n U32 466.683 Kg 4.1.1.17.b 18,317.75 8,548,573.36Ka
le
n U24 142.200 Kg 4.1.1.17.a 16,585.25 2,358,422.55nd
g Balok Berulang 43.140 M² 4.1.1.23.b 228,085.00 9,839,586.90er
. 15/40 cm M
225 0.488 M³ 4.1.1.7.a 1,244,365.64 607,561.52ul
ai
n U32 45.136 Kg 4.1.1.17.b 18,317.75 826,789.96Ke
n U24 25.952 Kg 4.1.1.17.a 16,585.25 430,412.12rja
g Balok Berulang 8.138 M² 4.1.1.23.b 228,085.00 1,856,041.69
0 cm
:
225 13.630 M³ 4.1.1.7.a 1,244,365.64 16,961,014.7818
h 732.285 Kg 4.1.1.19 13,993.65 10,247,342.53Jul
g Lantai Berulang Err:509 M² 4.1.1.24.b 253,676.50 Err:509 i
20
0M 16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
. 25/55 cm
225 13.258 M³ 4.1.1.7.a 1,244,365.64 16,497,955.22:
n U32 2,259.960 Kg 4.1.1.17.b 18,317.75 41,397,382.29PT
n U24 434.658 Kg 4.1.1.17.a 16,585.25 7,208,911.59.
A
g Balok Berulang 135.528 M² 4.1.1.23.b 228,085.00 30,911,789.84R
. 25/55 cm + Dinding Paraped S
225 0.369 M³ 4.1.1.7.a 1,244,365.64 458,859.83E
K
n U32 44.400 Kg 4.1.1.17.b 18,317.75 813,308.10O
n U24 9.401 Kg 4.1.1.17.a 16,585.25 155,917.94N
h M6 1.151 4.1.1.19 13,993.65 16,110.19K
g Balok Berulang 3.875 M² 4.1.1.23.b 228,085.00 883,829.38H
AT
. 20/45 cm UL
225 3.101 M³ 4.1.1.7.a 1,244,365.64 3,858,777.85IS
n U32 368.950 Kg 4.1.1.17.b 18,317.75 6,758,333.86TI
W
n U24 128.612 Kg 4.1.1.17.a 16,585.25 2,133,062.17A
g Balok Berulang 39.870 M² 4.1.1.23.b 228,085.00 9,093,748.95R
. 20/45 cm + Dinding Paraped E
225 2.540 M³ 4.1.1.7.a 1,244,365.64 3,160,688.73KA
YA
n U32 215.875 Kg 4.1.1.17.b 18,317.75 3,954,344.28S
n U24 73.865 Kg 4.1.1.17.a 16,585.25 1,225,069.49A
h M6 11.697 4.1.1.19 13,993.65 163,679.53W
ak
g Balok Berulang 33.020 M² 4.1.1.23.b 228,085.00 7,531,366.70tu
Pe
lak
sa
na
an

:
16
7
Ha
ri
Ka
le
nd
er
M
ul
ai
Ke
rja

:
18
Jul
i
20
16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
. 15/40 cm
225 0.619 M³ 4.1.1.7.a 1,244,365.64 769,951.24:
n U32 62.400 Kg 4.1.1.17.b 18,317.75 1,143,027.60PT
n U24 33.773 Kg 4.1.1.17.a 16,585.25 560,125.36.
A
g Balok Berulang 10.313 M² 4.1.1.23.b 228,085.00 2,352,126.56R
0 cm S
225 22.138 M³ 4.1.1.7.a 1,244,365.64 27,547,144.38E
K
h M6 1,189.337 Kg 4.1.1.19 13,993.65 16,643,168.33O
g Lantai Berulang 186.945 M² 4.1.1.24.b 253,676.50 47,423,553.29N
s Uk. 9/9 cm K
175 0.252 M³ 4.1.1.7.a 1,173,609.45 295,168.64H
AT
n U24 66.123 Kg 4.1.1.17.a 16,585.25 1,096,666.49UL
g Sloof 5.589 M² 4.1.1.21.c 121,107.25 676,868.42IS
Ringan Zincalume 680.400 M² 8.1.1.3 165,000.00 112,266,000.00TI
W
m Gelombang Persegi 0,35 680.400 M² 4.5.2.41.b 235,235.00 160,053,894.00A
t 75.546 M' 4.5.2.39. Err:509 Err:509 R
d Plank 98.600 M' 8.1.1.4 55,000.00 5,423,000.00E
Sub Total D KA
YA
JUMLAH TOTAL PEKERJAAN STRUKTUR S
JUMLAH TOTAL PPN 10 % A
JUMLAH TOTAL PEKERJAAN STRUKTUR + PPN 10 % W
ak
tu
Pe
lak
sa
na
an

:
16
7
Ha
ri
Ka
le
nd
er
M
ul
ai
Ke
rja

:
18
Jul
i
20
16
Ko
ntr
Dalam bahasa Indonesia

Masukan Angka di sini Ü 1,498,740,000.00


0 0
1 Satu 1 1
2 Dua 1,498 498
3 Tiga 1,498,740 740
4 Empat 1,498,740,000 0
5 Lima 0
6 Enam 0
7 Tujuh 4 Empat Ratus
8 Delapan 7 Tujuh Ratus
9 Sembilan 0
10 Sepuluh 0
11 Sebelas 0
12 Dua Belas 9 Sembilan Puluh
13 Tiga Belas 4 Empat Puluh
14 Empat Belas 0
15 Lima Belas 0
16 Enam Belas 1 Satu
17 Tujuh Belas 8 Delapan
18 Delapan Belas 0
19 Sembilan Belas 0
Puluh
Ratus
Satu Milyar
Milyar Empat Ratus Sembilan Puluh Delapan Juta
Juta Tujuh Ratus Empat Puluh Ribu
Ribu
Rupiah
Terbilang :
Satu Milyar Empat Ratus Sembilan Puluh Delapan Juta Tujuh Ratus Empat Puluh Ribu Rupiah

In English

Enter number here Ü 125,489,325,489,642.00


125 125
1 One 125,489 489
2 Two 125,489,325 325
3 Three 125,489,325,489 489
4 Four 125,489,325,489,642 642
5 Five 1 One Hundred
6 Six 4 Four Hundred
7 Seven 3 Three Hundred
8 Eight 4 Four Hundred
9 Nine 6 Six Hundred
10 Ten 25 Twenty Five
11 Eleven 89 Eighty Nine
12 Twelve 25 Twenty Five
13 Thirteen 89 Eighty Nine
14 Forteen 42 Forty Two
15 Fifteen 0
16 Sixteen
17 Seventeen
18 Eighteen
19 Nineteen
20 Twenty
21 Twenty One
22 Twenty Two
23 Twenty Three
24 Twenty Four
25 Twenty Five
26 Twenty Six
27 Twenty Seven
28 Twenty Eight
29 Twenty Nine
30 Thirty
31 Thirty One
32 Thirty Two
33 Thirty Three
34 Thirty Four
35 Thirty Five
36 Thirty Six
37 Thirty Seven
38 Thirty Eight
39 Thirty Nine
40 Forty
41 Forty One
42 Forty Two
43 Forty Three
44 Forty Four
45 Forty Five
46 Forty Six
47 Forty Seven
48 Forty Eight
49 Forty Nine
50 Fifty
51 Fifty One
52 Fifty Two
53 Fifty Three
54 Fifty Four
55 Fifty Five
56 Fifty Six
57 Fifty Seven
58 Fifty Eight
59 Fifty Nine
60 Sixty
61 Sixty One
62 Sixty Two
63 Sixty Three
64 Sixty Four
65 Sixty Five
66 Sixty Six
67 Sixty Seven
68 Sixty Eight
69 Sixty Nine
70 Seventy
71 Seventy One
72 Seventy Two
73 Seventy Three
74 Seventy Four
75 Seventy Five
76 Seventy Six
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
80 Eighty
81 Eighty One
82 Eighty Two
83 Eighty Three
84 Eighty Four
85 Eighty Five
86 Eighty Six
87 Eighty Seven
88 Eighty Eight
89 Eighty Nine
90 Ninety
91 Ninety One
92 Ninety Two
93 Ninety Three
94 Ninety Four
95 Ninety Five
96 Ninety Six
97 Ninety Seven
98 Ninety Eight
99 Ninety Nine
Hundred One Hundred Twenty Five Quintillion
Quintillion Four Hundred Eighty Nine Billion
Billion Three Hundred Twenty Five Million
Million Four Hundred Eighty Nine Thousand
Thousand Six Hundred Forty Two
Rupiah
in Words :
One Hundred Twenty Five Quintillion Four Hundred Eighty Nine Billion Three Hundred Twenty Five Million Four
Hundred Eighty Nine Thousand Six Hundred Forty Two Rupiah
FORMULIR REKAPITULASI PERHITUNGAN
TINGKAT KOMPONEN DALAM NEGERI (TKDN)

Nilai Gabungan Barang / Jasa (Rp.)


Total
Uraian Pekerjaan
DN LN Ribu
Rp
(1) (2) (3) (4)
Barang
I. Material Langsung Err:509 - Err:509
(Bahan Baku)
II. Peralatan (Barang Jadi) Err:509 - Err:509
A.Sub Total Barang Err:509 - Err:509
Jasa
III. Manajemen Proyek 44,962,200 - 44,962,200
dan Perekayasaan
IV. Alat Kerja / Fasilitas - - -
Kerja
V. Konstruksi dan - - -
Fabrikasi
VI. Jasa Umum 149,874,000 - 149,874,000
B. Sub Total Jasa 194,836,200 - 194,836,200
C. TOTAL Biaya (A+B) Err:509 - Err:509

Formulasi Perhitungan :
Nilai Barang Total (3C) - Nilai Barang Luar Negeri (3B)
Nilai Gabungan Barang dan Jasa (9C)
% TKDN (Gabungan Barang dan jasa) = +
Nilai JasaTotal (8C) - Nilai Jasa Luar Negeri (8B)
Nilai Gabungan Barang dan Jasa (9C)

% TKDN (Gabungan Barang dan jasa) = Err:509

CV. DUTA KHATUL


RIEFKI GUNAWAN SE
ERHITUNGAN
NEGERI (TKDN)

sa (Rp.) TKDN
Total
% Barang/Jasa Gabungan
KDN
(5) (7) (8)

Err:509 0.00% Err:509

Err:509 0.00% Err:509


Err:509 0.00% Err:509

3.00% - 3.00%
-
- - -

- - Err:509

10.00% 0.00% Err:509


13.00% 0.00% Err:509
Err:509 0.00% Err:509

g Luar Negeri (3B)

r Negeri (8B)

20 November 2019
CV. DUTA KHATULISTIWA
RIEFKI GUNAWAN SETIADI,A.Md
DIREKTUR
JADWAL WAKTU PELAKSANAAN

PEKERJAAN : PEMBANGUNAN MENARA MERCUSUAR


INSTANSI/DINAS : RUMAH SAKIT UMUM DAERAH DR. AGOESDJAM
LOKASI : JL.MAYJEND D.I.PENJAITAN NO.51 KABUPATEN KETAPANG
TAHUN ANGGARAN : 2019

WAKTU PELAKSANAAN 210 HAR


BOBOT
NO. JENIS PEKERJAAN
(%) BULAN KE-1 BULAN KE-II BULAN KE-III BULAN KE-IV
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15

A PEKERJAAN MENARA MERCUSUAR


I. PEKERJAAN PENDAHULUAN 22.80% 11.40% 11.40%
II. PEKERJAAN PONDASI 16.82% 2.80% 2.80% 2.80% 2.80% 2.80% 2.80%
III. PEKERJAAN STRUKTUR 43.82% 5.48% 5.48% 5.48% 5.48% 5.48% 5.48% 5.48%
IV. PEKERJAAN PLAT LANTAI 16.56% 2.76% 2.76% 2.76% 2.76% 2.76% 2.76%
V. PEKERJAAN TANGGA Err:509 Err:509 Err:509 Err:509
VI. PEKERJAAN ATAP Err:509

B. Err:509
I. Err:509 Err:509 Err:509
II. Err:509 Err:509 Err:509 Err:509 Err:509
III. Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. Err:509 Err:509

C. Err:509
I. Err:509 Err:509 Err:509
II. Err:509 Err:509
III. Err:509 Err:509
IV. Err:509 Err:509
V. Err:509 Err:509
VI. Err:509 Err:509
VII. Err:509 Err:509
VIII. Err:509 Err:509
IX, Err:509 Err:509

D. PEKERJAAN MEKANIKAL ELEKTRIKAL


1 Err:509 Err:509
2 Err:509 Err:509
3 Err:509 Err:509
4 Err:509 Err:509
5 Err:509 Err:509
6 Err:509 Err:509
7 Err:509 Err:509
8 Err:509 Err:509
9 Err:509 Err:509
10 Err:509 Err:509
11 Err:509 Err:509
12 Err:509 Err:509
13 Err:509 Err:509
14 Err:509 Err:509
15 Err:509 Err:509

BOBOT RENCANA Err:509 11.40% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
BOBOT KUMULATIF 0.00% 11.40% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

336 PONTIANAK
CV. DUTA KH
RIEFKI GUN
Kepala Cabang
TU PELAKSANAAN

WAKTU PELAKSANAAN 210 HARI KALENDER


BULAN KE-IV BULAN KE-V BULAN KE-VI BULAN KE-VII KET
M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28
100%

5.48%

Err:509 Waktu
Err:509 Err:509 Err:509 Pelaksanaan
210 hari
kalender

Err:509
Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 50%
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0%

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

PONTIANAK, 15 MEI 2019


CV. DUTA KHATULISTIWA
RIEFKI GUNAWAN SETIADI,A.Md
Kepala Cabang Ketapang
Nomor : 24/PEN/PT.RWK/KTP-RSUD
Lampiran : 1 (satu) berkas

Kepada Yth :
Kelompok Kerja Pemilihan
Pokja Pemilihan Balai Layanan Pengadaan ( BLP) Ka

Di -
Jl. Jend. Sudirman No.37 Ketapang

Perihal :

Sehubungan dengan Pengumunan Tender Pascakualifi

dan setelah kami pelajari dengan seksama Dokumen

dengan ini kami mengajukan penawaran untuk Pekerjaa


Rp 1,498,740,000.00 ( Satu Milyar Empat Ratus S

Penawaran ini sudah memperhatikan ketentuan dan per

Penawaran ini berlaku selama 60 ( enam puluh ) hari ka

Sesuai dengan persyaratan, bersama Surat Penawaran


I. Jaminan Penawaran Asli
II. Dokumen penawaran teknis, terdiri dari
1.Metoda Pelaksanaan Pekerjaan
2.Jadwal Waktu Pelaksanaan Pekerjaan
3. Daftar Isian Peralatan Utama berserta b
4. Daftar Isian Personil Manajerial Beserta
Pemberi Tugas
5. Rencana Keselamatan Konstruksi ( RK
6. Pernyataan Sanggup Membayar BPJS
7. Surat Pernyataan Kepemilikan Sertifika
8. Pernyataan Tidak Masuk dalam Daftar H
9. Pernyataan Tidak Pengawasan Pengad
10. Pernyataan Tidak Dalam Sanksi Pidana
11. Pernyataan Tidak Dalam Petentangan d
12. Pernyataan Tidak Dalam Status Aparatu
13. Pernyataan Kebenaran Dokumen Pena
14. Spesifikasi Teknis
15. Surat Dukungan Produk Beton Ready M
16. Surat Dukungan Produk Mine Pile
17. SuraT Dukungan Pabrikasi Komponen
18. Dukungan Produk Sistem Interior Khusu
19. Dukungan Produk Bed Elevator
20. Brosur Produk Barang
III. Dokumen Penawaran Harga terdri atas
a.Daftar Kuantitas dan Harga
IV. Dokumen Lain.
a.Formulir rekapitulasi Perhitungan Tingk
( Apabila memenuhi syarat untuk diberik

Dengan disampaikannya Surat Penawaran ini, maka kam


Dokumen Pemilihan .
N/PT.RWK/KTP-RSUD /V/2019
) berkas

engadaan ( BLP) Kabupaten Ketapang

an No.37 Ketapang

PEMBANGUNAN MENARA MERCUSUAR

Tender Pascakualifikasi dan Dokumen Pemilihan nomor : 6

n seksama Dokumen Pengadaan dan Berita Acara Pember

waran untuk Pekerjaan Pembangunan Ruang Operasi (DAK


Milyar Empat Ratus Sembilan Puluh Delapan Juta Tujuh Ratus E

an ketentuan dan persyaratan yang tercantum dalam Dokumen

enam puluh ) hari kalender sejak batas akhir pemasukan pen

ma Surat Penawaran ini kami lampirkan :


an Asli
an teknis, terdiri dari :
an Pekerjaan
aksanaan Pekerjaan
tan Utama berserta bukti/ dokumen pendukung
nil Manajerial Beserta Daftar Riwayat Hidup Pengalaman Kerj

atan Konstruksi ( RKK)


up Membayar BPJS Ketenagakerjaan seluruh personil apabila
Kepemilikan Sertifikat Kompetensi Kerja
Masuk dalam Daftar Hitam .
Pengawasan Pengadilan,Pailit Usaha
Dalam Sanksi Pidana
Dalam Petentangan dengan Pihak Terkait
Dalam Status Aparatur Sipil Negara
aran Dokumen Penawaran

roduk Beton Ready Mix


roduk Mine Pile
Pabrikasi Komponen Inti Instalasi Gas Medis memiliki Garansi
Sistem Interior Khusus Ruang OK (Operasi)
Bed Elevator

ran Harga terdri atas:


an Harga

si Perhitungan Tingkat Komponen Dalam Negeri ( TKDN)


hi syarat untuk diberikan preferensi harga ) dan

awaran ini, maka kami menyatakan sanggup dan akan tunduk

CV. DUTA KHATULI

RIEFKI GUNAWAN
DIREKTUR
Pontianak, 15 Mei 2019

AR

ihan nomor : 600/0310/POKJA BLP/0023/2019, tanggal 06 M

Acara Pemberian Penjelasan [serta adendum Dokumen Pe

Operasi (DAK) . sebesar :


ta Tujuh Ratus Empat Puluh Ribu Rupiah )

dalam Dokumen Pengadaan untuk melaksanakan pekerjaan te

pemasukan penawaran.

ngalaman Kerja dan Referensi Kerja dari

personil apabila ditunjuk sebagai pemenang tender

emiliki Garansi Produk 2 Tahun dan Purna Jual


ri ( TKDN)

an akan tunduk pada semua ketentuan yang tercantum dalam

DUTA KHATULISTIWA

KI GUNAWAN SETIADI,A.Md
KTUR
5 Mei 2019

2019, tanggal 06 Mei 2019

dum Dokumen Pengadaan],


termasuk PPN.

nakan pekerjaan tersebut .

g tender

Jual
g tercantum dalam
TABEL KENDALI DOKUMEN

DATA PEMILIK PROYEK


PEMERINTAH KALIMANTAN BARAT
KANTOR DINAS DINAS PEKERJAAN UMUM
SUB DINAS
PANITIA PENGADAAN BARANG / JASA KANTOR LAYANAN PENGADAAN PADA BIDANG PENGAIRAN
DINAS PEKERJAAN UMUM LAMPUNG BARAT TAHUN 2015

KOTA KEDUDUKAN LIWA


ALAMAT Jl. Tulip No.11 Way Mengaku Liwa Lampung Barat

DATA PROYEK
KEGIATAN
PEKERJAAN PEMBANGUNAN MENARA MERCUSUAR
LOKASI D.I WAY PALAKIA - KEC. SUKAU, KAB. LAMPUNG BARAT
NOMOR PAKET
NOMOR DOKUMEN 027/01/POKJA/DAK IR.8/II.07/II/2015
TANGGAL DOKUMEN 19 November 2019
SUMBER DANA APBD Tahun Anggaran 2019
TH ANGGARAN 2019
WAKTU PELAKSANAAN 150 (Seratus Lima Puluh) hari kalender
MASA JAMINAN PENAWARAN
SURAT PENAWARAN 60 (Enam Puluh) hari kalender
PAGU Rp 1,500,000,000

DATA PERUSAHAAN
NAMA PERUSAHAAN CV. DUTA KHATULISTIWA
NO REK GIRO NT
NO NPWP 03.268.976.2-701.000
ALAMAT PERUSAHAAN Jl. Komplek Terminal Siantan Indah N0.A-7
PIMPINAN RIEFKI GUNAWAN SETIADI,A.Md
JABATAN DIREKTUR
TANGGAL PENAWARAN 20 November 2019 Pontianak
NOMOR SURAT 25
BULAN SURAT XI

PAGU Rp 1,500,000,000.00
NETT KONTRAK Rp 1,363,636,363.64
PPN Rp 136,363,636.36
PPH Rp 34,090,909.09
PENDAPATAN PROYEK Rp 1,329,545,454.55
PERSENTASE PENAWARAN 24.00%
HARGA PENAWARAN Rp 360,000,000.00

Surat Penawaran
Jaminan Penawaran Asli
Rekapitulasi RAB
Daftar Kuantitas Dan Harga
Analisa Pekerjaan
Daftar Harga Upah
Daftar Harga Bahan
Daftar Harga Alat
Surat Kuasa / Akta Notaris
Metode Pelaksanaan
Jadwal Pelaksanaan Pek
Daftar Peralatan Utama
Daftar Personil Inti
Spesifikasi Teknis
Formulir TKDN
ADAAN BARANG / JASA KANTOR LAYANAN PENGADAAN PADA BIDANG PENGAIRAN
S PEKERJAAN UMUM LAMPUNG BARAT TAHUN 2015

BANGUNAN MENARA MERCUSUAR


JENIS/TIPE IDENTIFIKASI
NO DAMPAK
PEKERJAAN BAHAYA

1 2 3 4

- Tergigit Binatang buas atau berbisa


1 PEKERJAAN PENDAHULUAN Kondisi tidak aman/berbahay
pada saat pembersihan
- Bahaya pada Tangan, kaki dan
- PEKERJAAN PENDAHULUAN - kecelakaan kerja
anggota tubuh

- Pembongkaran dan Pembersihan Ramsu - Terluka terkena peralatan kerja - kecelakaan kerja

- Tertusuk paku pada saat pekerjaan


- Papan Nama Proyek - kecelakaan kerja
kayu

- Disimpan Digudang Material Disnav Pontianak - Kecelakaan Lalu lintas pada saat mobi
- kecelakaan kerja

- Survei dan penentuan titik tetap

- Pekerjaan uitset dan bouwplank

- Direksi keet dan gudang

- Mobilisasi dan Demobilisasi

- Pelaporan dan dokumentasi

- Tertimpa material Kayu Belian atu


2 PEKERJAAN PONDASI - kecelakaan kerja
tongkat Kayu
-bahaya jika terkena kepala atau
- Galian Tanah Pondasi - kecelakaan kerja
bagian tubuh yang lain
- Terjepit atau tertiban material kayu
- Pengadaan Tiang Pancang (Square Pile 30x30) - kecelakaan kerja
belian

- Pemancangan Mini Pile 25 x 25 K450 - Tertimpa material besi , batu dan - kecelakaan kerja
adukan beton
- Terkena paku pada saat pembuatan
- Join Welding - kecelakaan kerja
bekisting

- Pekerjaan Beton Pondasi - Terpeleset jatuh pada saat perbaikan- kecelakaan kerja

Terkena / Terluka karena peralatan


- Penulangan - kecelakaan kerja
kerja

- Bekisting Tertusuk Paku / baut kayu belian - kecelakaan kerja

- Tertimpa material Kayu Belian atu


3 PEKERJAAN MENARA MERCUSUAR - kecelakaan kerja
tongkat Kayu
-bahaya jika terkena kepala atau
- Pekerjaan Konstruksi Menara Baja Galvanis - kecelakaan kerja
bagian tubuh yang lain
- Terjepit atau tertiban material kayu
- Pekerjaan Angkur Galvanis M22 600m - kecelakaan kerja
belian
- Tertimpa material besi , batu dan
- Pekerjaan Mur Baut Galvanis 16x65 mm - kecelakaan kerja
adukan beton

- Pekerjaan Mur Baut Galvanis 16x55 mm

- Pekerjaan Mur Baut Galvanis 16x50 mm

- Pekerjaan Mur Baut Galvanis 16x45 mm

- Pekerjaan Mur Baut Galvanis 16x40 mm

- Terkena paku pada saat pembuatan


- Pekerjaan Mur Baut Galvanis 16x35 mm - kecelakaan kerja
bekisting

- Pekerjaan Pemasangan Menara - Terpeleset jatuh pada saat perbaikan- kecelakaan kerja
Terkena / Terluka karena peralatan
- Pengecatan Menara Dengan Cat Menie Marine Paint - kecelakaan kerja
kerja

- Pengecatan Menara Dengan Cat Putih Menie Marine Paint Tertusuk Paku / baut kayu belian - kecelakaan kerja

4 PEKERJAAN PERALATAN SBNP - Terluka Alat Tukang - kecelakaan kerja

- Pekerjaan Sistem lampu Suar ML300 - Terjatuh dari ketinggian - kecelakaan kerja

- Pekerjaan Solar Module 80watt Marine Grade

- Pemasangan Bateray 12 Volt/100 Ah Vrla

- Pekerjaan Solar Charge Controller 12V/24V 10 A

- Pekerjaan Almari Box Ukuran Besar (Large) dan Dudukan Lampu

- Pekerjaan Panel box - Begisting Roboh - kecelakaan kerja

- Radar Reflektor -Tertusuk besi - kecelakaan kerja

- Tertimpa Material kayu, genteng


- Pekerjaan Instalasi dan Setting Lampu - kecelakaan kerja
metal

- Pekerjaan Papan Nama Lampu Suar - Bahaya Luka pada tangan dan kaki - kecelakaan kerja
PENILAIAN RISIKO
SKALA PENETAPAN PENGENDALIAN
TINGKAT PRIORITAS RISIKO K3
KEKERAPAN KEPARAHAN
RISIKO
5 6 7 8 9

Menggunakan peralatan kerja dan


2 2 1 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
3 2 5 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
3 2 3 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
2 2 4 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
4 3 3 3 ==>
APD yang sesuai

Menggunakan peralatan kerja dan


1 3 5 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
2 3 4 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
1 3 5 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
2 2 5 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
2 2 3 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
3 2 3 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
2 3 3 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
3 2 5 3 ==>
APD yang sesuai

Menggunakan peralatan kerja dan


3 2 3 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
3 2 5 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
2 2 5 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
3 2 5 3 ==>
APD yang sesuai

Menggunakan peralatan kerja dan


2 2 3 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
2 2 5 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
2 2 3 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
4 3 2 3 ==>
APD yang sesuai

Menggunakan peralatan kerja dan


3 2 3 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
3 2 5 3 ==>
APD yang sesuai

Menggunakan peralatan kerja dan


2 2 5 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
3 2 5 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
2 2 3 3 ==>
APD yang sesuai
Menggunakan peralatan kerja dan
2 2 5 3 ==>
APD yang sesuai

20 November 2019
CV. DUTA KHATULISTIWA
RIEFKI GUNAWAN SETIADI,A.Md
DIREKTUR
DOKUMEN PENAWARAN

PEMBANGUNAN MENARA
MERCUSUAR

DINAS PEKERJAAN UMUM

KALIMANTAN BARAT
TAHUN ANGGARAN 2019
DOKUMEN KUALIFIKASI

PEMBANGUNAN MENARA
MERCUSUAR

DINAS PEKERJAAN UMUM

KALIMANTAN BARAT
TAHUN ANGGARAN 2019
Pontianak, 20 November 2019
Nomor : 25/DMS/SP/XI/2015
Lampiran : -

Kepada Yth
PENGADAAN BARANG / JASA KANTOR LAYANAN PENGADAAN PADA BIDANG PENGAIRAN DINAS PEKERJAAN UMUM
LAMPUNG BARAT TAHUN 2015
Di -
LIWA

Perihal : PENAWARAN PEKERJAAN PEMBANGUNAN MENARA MERCUSUAR

Sehubungan dengan pengumuman Pemilihan Langsung dengan Pascakualifikasi dan Dokumen Pengadaan Nomor:
027/01/POKJA/DAK IR.8/II.07/II/2015 Tanggal 19 November 2019 setelah kami pelajari dengan seksama Dokumen Pengadaan
dan Berita Acara Pemberian Penjelasan [serta adendum Dokumen Pengadaan], dengan ini kami mengajukan penawaran untuk
Pekerjaan PEMBANGUNAN MENARA MERCUSUAR sebesar :

Rp 1,498,740,000.00
Terbilang : ( Satu Milyar Empat Ratus Sembilan Puluh Delapan Juta Tujuh Ratus Empat Puluh Ribu Rupiah )
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen Pengadaan untuk
melaksanakan pekerjaan tersebut diatas. Surat Penawaran ini berlaku 60 (Enam Puluh) hari kalender terhitung efektif sejak
tanggal 20 November 2019

Dengan waktu pelaksanaan pekerjaan selama 150 (Seratus Lima Puluh) hari kalender
Sesuai dengan persyaratan, bersama Surat Penawaran ini kami sampaikan :
1 Jaminan Penawaran
2 Daftar Kuantitas dan Harga,
3 Surat Kuasa (apabila ada)
4 Surat Perjanjian kemitraan/Kerja Sama Operasi (apabila ada)
5 Dokumen penawaran teknis, terdiri dari
a. Metode Pelaksanaan
b. Jadwal Waktu Pelaksanaan
c. Daftar Personil Inti
d. Jenis , kapasitas, komposisi, dan jumlah peralatan utama minimal yang dibutuhkan
e. Spesifikasi Teknis
6 Formulir Rekapitulasi Perhitungan Tingkat Komponen Dalam Negeri (TKDN)
7 Dokumen Isian kualifikasi yang dikirm melalui aplikasi SPSE

Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua ketentuan yang
tercantum dalam Dokumen Pengadaan serta POKJA ULP tidak terikat untuk menetapkan penawaran terendah untuk sebagai
pemenang. Apabila dana dalam dokumen anggaran yang telah disahkan tidak tersedia atau tidak cukup tersedia dalam
DIPA/DPA-SKPA Tahun Anggaran 2015, maka pengadaan Barang/Jasa dapat dibatalkan dan kami tidak akan menuntut ganti rugi
dalam bentuk apapun

CV. DUTA KHATULISTIWA

RIEFKI GUNAWAN SETIADI,A.Md


DIREKTUR
REKAPITULASI
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN MENARA MERCUSUAR
DINAS / INSTANSI : DINAS PEKERJAAN UMUM KALIMANTAN BARAT
LOKASI : D.I WAY PALAKIA - KEC. SUKAU, KAB. LAMPUNG BARAT
TAHUN ANGGARAN : 2019

NO. URAIAN PEKERJAAN

1 2
A PEKERJAAN MENARA MERCUSUAR
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PONDASI
III PEKERJAAN MENARA MERCUSUAR
IV PEKERJAAN PERALATAN SBNP
JUMLAH TOTAL
PPN 10 %
JUMLAH TOTAL + PPN 10 %
DIBULATKAN
( Satu Milyar Empat Ratus Sembilan Puluh Delapan Juta Tujuh Ratus E
TERBILANG :
Rupiah )
REKAPITULASI
RENCANA ANGGARAN BIAYA

AS PEKERJAAN UMUM KALIMANTAN BARAT


WAY PALAKIA - KEC. SUKAU, KAB. LAMPUNG BARAT

JUMLAH SUB TOTAL

310,647,816.00
229,177,359.49
597,033,781.56
225,632,451.00
1,362,491,408.05
136,249,140.80
1,498,740,548.85
1,498,740,000.00
atu Milyar Empat Ratus Sembilan Puluh Delapan Juta Tujuh Ratus Empat Puluh Ribu
ah )

20 November 2019
CV. DUTA KHATULISTIWA

RIEFKI GUNAWAN SETIADI,A.Md


DIREKTUR
RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN MENARA MERCUSUAR


DINAS / INSTANSI : DINAS PEKERJAAN UMUM
LOKASI : D.I WAY PALAKIA - KEC. SUKAU, KAB. LAMPUNG BARAT
TAHUN ANGGARAN : 2019

KODE
NO URAIAN PEKERJAAN VOLUME
ANALISA

1 2 3 4
A. PEKERJAAN MENARA MERCUSUAR
I PEKERJAAN PENDAHULUAN
1 Pembongkaran dan Pembersihan Ramsu 1.00
2 Papan Nama Proyek 1.00
3 Disimpan Digudang Material Disnav Pontianak 1.00
4 Survei dan penentuan titik tetap 1.00
5 Pekerjaan uitset dan bouwplank 2.2.1.4.a 16.00
6 Direksi keet dan gudang 16.00
7 Mobilisasi dan Demobilisasi 1.00
8 Pelaporan dan dokumentasi 1.00
Sub Jumlah I
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi 2.3.1.1 32.00
2 Pengadaan Tiang Pancang (Square Pile 30x30) 288.00
3 Pemancangan Mini Pile 25 x 25 K450 288.00
4 Join Welding 32.00
5 Pekerjaan Beton Pondasi 4.1.1.7.a 34.30
6 Penulangan 4.1.1.17.a 1,617.56
7 Bekisting 76.02
Sub Jumlah II
IIIPEKERJAAN MENARA MERCUSUAR
1 Pekerjaan Konstruksi Menara Baja Galvanis 10.738,87
2 Pekerjaan Angkur Galvanis M22 600m 16,00
3 Pekerjaan Mur Baut Galvanis 16x65 mm 192,00
4 Pekerjaan Mur Baut Galvanis 16x55 mm 10,00
5 Pekerjaan Mur Baut Galvanis 16x50 mm 2.027,00
6 Pekerjaan Mur Baut Galvanis 16x45 mm 26,00
7 Pekerjaan Mur Baut Galvanis 16x40 mm 44,00
8 Pekerjaan Mur Baut Galvanis 16x35 mm 36,00
9 Pekerjaan Pemasangan Menara 10.738,87
10 Pengecatan Menara Dengan Cat Menie Marine Paint 255,52
11 Pengecatan Menara Dengan Cat Putih Menie Marine Paint 255,52
Sub Jumlah III
IV PEKERJAAN PERALATAN SBNP
KODE
NO URAIAN PEKERJAAN VOLUME
ANALISA

1 2 3 4
1 Pekerjaan Sistem lampu Suar ML300 1.00
2 Pekerjaan Solar Module 80watt Marine Grade 4.00
3 Pemasangan Bateray 12 Volt/100 Ah Vrla 4.00
4 Pekerjaan Solar Charge Controller 12V/24V 10 A 1.00
5 Pekerjaan Almari Box Ukuran Besar (Large) dan Dudukan Lampu 1.00
6 Pekerjaan Panel box 1.00
7 Radar Reflektor 1.00
8 Pekerjaan Instalasi dan Setting Lampu 1.00
9 Pekerjaan Papan Nama Lampu Suar 1.00
Sub Jumlah IV
JUMLAH TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL
JUMLAH TOTAL PPN 10 %
JUMLAH TOTAL PEKERJAAN MEKANIKAL + PPN 10 %
A ANGGARAN BIAYA

HARGA SATUAN
SAT SUB JUMLAH (Rp.)
(Rp.)

5 6 7

Lsm 12,000,000.00 12,000,000.00


Lsm 400,000.00 400,000.00
Lsm 23,000,000.00 23,000,000.00
Lsm 14,000,000.00 14,000,000.00
M' 65,488.50 1,047,816.00
Lsm 1,300,000.00 20,800,000.00
Lsm 235,000,000.00 235,000,000.00
Lsm 4,400,000.00 4,400,000.00
I 310,647,816.00

M³ 90,612.50 2,899,600.00
M² 350,000.00 100,800,000.00
M² 120,000.00 34,560,000.00
Titik 600,000.00 19,200,000.00
M³ 1,244,365.64 42,681,741.50
Kg 16,585.25 26,827,636.99
M² 29,050.00 2,208,381.00
II 229,177,359.49

Kg 32,000.00 #VALUE!
Unit 120,000.00 #VALUE!
Unit 24,000.00 #VALUE!
Unit 23,500.00 #VALUE!
Unit 23,000.00 #VALUE!
Unit 22,500.00 #VALUE!
Unit 22,000.00 #VALUE!
Unit 21,500.00 #VALUE!
Kg 14,300.00 #VALUE!
M² 78,982.50 #VALUE!
M² 93,658.00 #VALUE!
III 597,033,781.56
HARGA SATUAN
SAT SUB JUMLAH (Rp.)
(Rp.)

5 6 7
Unit 150,000,000.00 150,000,000.00
Unit 5,000,000.00 20,000,000.00
Unit 4,500,000.00 18,000,000.00
Unit 11,000,000.00 11,000,000.00
Unit 600,000.00 600,000.00
Unit 7,300,000.00 7,300,000.00
Unit 7,250,000.00 7,250,000.00
Paket 10,000,000.00 10,000,000.00
Unit 1,482,451.00 1,482,451.00
IV 225,632,451.00
KANIKAL ELEKTRIKAL 1,362,491,408.05
PN 10 % 136,249,140.80
KANIKAL + PPN 10 % 1,498,740,548.85
REKAPITULASI RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
PEKERJAAN : PEMBANGUNAN GEDUNG OPERASI (OK) DAN BERSALIN (VK)
DINAS / INSTANSI : RUMAH SAKIT UMUM DAERAH DR. AGOESDJAM
LOKASI : JL. MAYJEND D.I. PANJAITAN NO. 51 KABUPATEN KETAPANG
TAHUN ANGGARAN : 2018

NO. URAIAN PEKERJAAN

1 2
A PEKERJAAN STRUKTUR GEDUNG
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PONDASI
III PEKERJAAN STRUKTUR
IV PEKERJAAN PLAT LANTAI
V PEKERJAAN TANGGA
VI PEKERJAAN ATAP
Sub Jumlah Pekerjaan Struktur Gedung
B PEKERJAAN STRUKTUR SELASAR DAN RAMP
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PONDASI
III PEKERJAAN STRUKTUR
IV PEKERJAAN PLAT LANTAI
V PEKERJAAN ATAP
Sub Jumlah Pekerjaan Struktur Selasar dan Ramp
C PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
II PEKERJAAN LANTAI
III PEKERJAAN PLAFON
IV PEKERJAAN PINTU DAN JENDELA
V PEKERJAAN SANITAIR
VI PEKERJAAN PENGECATAN
VII PEKERJAAN LAIN-LAIN
VIII ARSITEKTUR KHUSUS RUANG OK
IX ARSITEKTUR FASADE BANGUNAN
Sub Jumlah Pekerjaan Arsitektur
D PEKERJAAN MEKANIKAL ELEKTRIKAL
01 INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 1 & LANTAI 2
02 INSTALASI TATA UDARA / AC LANTAI 1 & 2
03 INSTALASI TELEPHONE LANTAI 1 & LANTAI 2
04 INSTALASI FIRE ALARM LANTAI 1 & LANTAI 2
05 INSTALASI TATA SUARA LANTAI 1 & LANTAI 2
06 INSTALASI KABEL WIFI LANTAI 1 & LANTAI 2

Rekapitulasi RAB_Gedung OK dan VK 113


NO. URAIAN PEKERJAAN

1 2
07 INSTALASI CCTV LANTAI 1 & LANTAI 2
08 AIR BEKAS, KOTOR DAN VENT LANTAI 1 & LANTAI 2
09 AIR BERSIH LANTAI 1 & LANTAI 2
10 AIR PANAS
11 PENANGGULANGAN KEBAKARAN LANTAI 1 & LANTAI 2
12 SALURAN AIR HUJAN
13 INSTALASI GAS MEDIS LANTAI 1 & LANTAI 2

Rekapitulasi RAB_Gedung OK dan VK 114


NO. URAIAN PEKERJAAN

1 2
14 PENYALUR PETIR
15 BED ELEVATOR
Sub Jumlah Pekerjaan Mekanikal Elektrikal

JUMLAH TOTAL
PPN 10 %
JUMLAH TOTAL + PPN 10 %
DIBULATKAN
DUA PULUH TIGA MILYAR TIGA RATUS EMPAT PULUH SEMBILAN JUTA D
TERBILANG :
LIMA PULUH DELAPAN RIBU RUPIAH

Ketapang, Desember 201


Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegiatan Konsultan Perencana
(PPTK) CV. TRI WASTU

RATIH SUMARNI, ST. ERMAN MOROLU MALLULUANG


NIP. 19830805 201001 2 008 Direktur

Disetujui Oleh : Mengetahui Oleh :


Pejabat Pembuat Komitmen Kepala RSUD Dokter Agoesd
(PPK) Kabupaten Ketapang

WIDIYATMOKO, S.Si. dr. RUSDY EFFENDY


NIP. 19801009 200212 1006 NIP. 19631216 199103 1 00

Rekapitulasi RAB_Gedung OK dan VK 115


ULASI RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
NGUNAN GEDUNG OPERASI (OK) DAN BERSALIN (VK)
H SAKIT UMUM DAERAH DR. AGOESDJAM
YJEND D.I. PANJAITAN NO. 51 KABUPATEN KETAPANG

JUMLAH SUB TOTAL

78,758,524.90
2,068,751,525.83
3,364,765,172.60
978,332,619.21
55,997,435.01
383,471,115.28
6,930,076,392.84

10,176,912.90
862,291,078.89
1,177,878,857.49
281,962,798.54
56,508,149.18
2,388,817,797.01

990,709,429.59
1,237,649,154.72
412,178,746.69
873,716,451.87
806,013,522.66
255,052,522.89
41,866,681.80
1,408,559,130.00
415,350,296.00
6,441,095,936.23

1,384,929,331.99
2,119,365,766.30
46,950,400.00
63,486,190.00
83,355,315.00
13,652,940.00

Rekapitulasi RAB_Gedung OK dan VK 116


JUMLAH SUB TOTAL

3
57,935,800.00
231,771,093.70
137,173,433.00
21,299,749.72
11,184,000.00
165,724,199.00
408,146,631.01

Rekapitulasi RAB_Gedung OK dan VK 117


JUMLAH SUB TOTAL

3
32,178,800.00
869,600,000.00
5,646,753,649.71

21,406,743,775.78
2,140,674,377.58
23,547,418,153.36
23,547,418,000.00
LUH TIGA MILYAR TIGA RATUS EMPAT PULUH SEMBILAN JUTA DELAPAN RATUS
ULUH DELAPAN RIBU RUPIAH

Ketapang, Desember 2018


Dibuat Oleh :
Konsultan Perencana
CV. TRI WASTU

ERMAN MOROLU MALLULUANG, ST.


Direktur

Mengetahui Oleh :
Kepala RSUD Dokter Agoesdjam
Kabupaten Ketapang

dr. RUSDY EFFENDY


NIP. 19631216 199103 1 008

Rekapitulasi RAB_Gedung OK dan VK 118


RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

PEKERJAAN : PEMBANGUNAN GEDUNG OPERASI (OK) DAN BERSALIN (VK)


DINAS / INSTANSI : RUMAH SAKIT UMUM DAERAH DR. AGOESDJAM
LOKASI : JL. MAYJEND D.I. PANJAITAN NO. 51 KABUPATEN KETAPANG
TAHUN ANGGARAN : 2018

KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
A. PEKERJAAN STRUKTUR GEDUNG
I PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank 2.2.1.4.a 170.20 M'
2 Pembongkaran 1.00 Lsm
3 Pagar Sementara 2.2.1.2.a 171.40 M'
4 Papan Nama Proyek 1.00 Lsm
Sub Jumlah I
II PEKERJAAN PONDASI
1 Pengadaan Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 702.00 Btg
450 -6 m
2 Pemancangan Mini Pile 25 x 25 K450 4,212.00 M'
3 Pembobokan Mini Pile 234.00 Titik
4 Galian Tanah Pondasi 2.3.1.1 128.74 M³
5 Urugan Pasir t = 10 cm 2.3.1.11 15.15 M³
6 Lantai Kerja t = 5 cm 4.1.1.4 7.57 M³
7 Poer Type P1
- Beton Ready Mix K-300 B. 13.i.2 1.26 M³
- Tulangan U32 4.1.1.17.b 137.28 Kg
- Bekisting Pondasi 4.1.1.20.a 8.40 M²
8 Poer Type P2
- Beton Ready Mix K-300 B. 13.i.2 7.81 M³
- Tulangan U32 4.1.1.17.b 666.78 Kg
- Bekisting Pondasi 4.1.1.20.a 29.61 M²
9 Poer Type P3
- Beton Ready Mix K-300 B. 13.i.2 1.57 M³
- Tulangan U32 4.1.1.17.b 105.83 Kg
- Bekisting Pondasi 4.1.1.20.a 3.99 M²
10 Poer Type P4
- Beton Ready Mix K-300 B. 13.i.2 1.68 M³
- Tulangan U32 4.1.1.17.b 157.45 Kg
- Bekisting Pondasi 4.1.1.20.a 4.34 M²

RAB_Gedung OK dan VK 119


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
11 Poer Type P6
- Beton Ready Mix K-300 B. 13.i.2 9.98 M³
- Tulangan U32 4.1.1.17.b 652.08 Kg
- Bekisting Pondasi 4.1.1.20.a 21.56 M²
12 Poer Type P8
- Beton Ready Mix K-300 B. 13.i.2 14.81 M³
- Tulangan U32 4.1.1.17.b 892.79 Kg
- Bekisting Pondasi 4.1.1.20.a 25.76 M²
13 Poer Type P9
- Beton Ready Mix K-300 B. 13.i.2 29.62 M³
- Tulangan U32 4.1.1.17.b 1,785.57 Kg
- Bekisting Pondasi 4.1.1.20.a 51.52 M²
14 Poer Type P10
- Beton Ready Mix K-300 B. 13.i.2 39.28 M³
- Tulangan U32 4.1.1.17.b 2,266.98 Kg
- Bekisting Pondasi 4.1.1.20.a 59.92 M²
15 Kolom Pondasi K1 Uk. 45x45 cm
- Beton Ready Mix K-225 B. 13.f.2 4.25 M³
- Tulangan U32 4.1.1.17.b 1,722.01 Kg
- Tulangan U24 4.1.1.17.a 167.82 Kg
- Bekisting Pondasi 4.1.1.20.a 37.80 M²
16 Kolom Pondasi K2 Uk. 30x30 cm
- Beton Ready Mix K-225 B. 13.f.2 0.44 M³
- Tulangan U32 4.1.1.17.b 189.67 Kg
- Tulangan U24 4.1.1.17.a 25.07 Kg
- Bekisting Pondasi 4.1.1.20.a 5.88 M²

RAB_Gedung OK dan VK 120


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
17 Kolom Pondasi K2 Uk. 20x40 cm (L)
- Beton Ready Mix K-225 B. 13.f.2 0.36 M³
- Tulangan U32 4.1.1.17.b 79.58 Kg
- Tulangan U24 4.1.1.17.a 8.58 Kg
- Bekisting Pondasi 4.1.1.20.a 1.92 M²
Struktur Bawah Lift :
1 Dinding Masif
- Beton Ready Mix K 225 t = 14 cm B. 13.f.2 2.52 M³
- Wiremesh 2xM7 4.1.1.19 150.29 Kg
- Bekisting Balok 4.1.1.23.b 36.04 M²
- Plesteran Dinding 4.4.2.4 36.04 M²
- Waterproofing Dinding A.4.7.1.10.f 36.04 M²
2 Plat Bawah Dudukan Lift
- Galian Tanah 2.3.1.1 5.41 M³
- Urugan Pasir tebal 10 cm 2.3.1.11 1.80 M³
- Lantai Kerja t = 5 cm 4.1.1.4 0.90 M³
- Beton Ready Mix K 225 t = 16 cm B. 13.f.2 2.88 M³
- Wiremesh 2xM7 4.1.1.19 150.29 Kg
- Plesteran Atas Plat 4.4.2.4 18.02 M²
- Waterproofing Lantai A.4.7.1.10.f 18.02 M²
Sub Jumlah II
III PEKERJAAN STRUKTUR
Struktur Lantai 1
1 Sloof Uk. 35x60 cm
- Beton Ready Mix K-225 B. 13.f.2 47.24 M³
- Tulangan U32 4.1.1.17.b 9,766.80 Kg
- Tulangan U24 4.1.1.17.a 1,888.72 Kg
- Bekisting Sloof 4.1.1.21.a 364.43 M²
2 Sloof Uk. 25x50 cm
- Beton Ready Mix K-225 B. 13.f.2 20.81 M³
- Tulangan U32 4.1.1.17.b 2,695.54 Kg
- Tulangan U24 4.1.1.17.a 712.87 Kg
- Bekisting Sloof 4.1.1.21.a 218.49 M²
3 Sloof Uk. 20x45 cm
- Beton Ready Mix K-225 B. 13.f.2 0.57 M³
- Tulangan U32 4.1.1.17.b 64.15 Kg
- Tulangan U24 4.1.1.17.a 23.97 Kg
- Bekisting Sloof 4.1.1.21.a 7.31 M²
3 Sloof Uk. 20x40 cm
- Beton Ready Mix K-225 B. 13.f.2 7.34 M³
- Tulangan U32 4.1.1.17.b 983.01 Kg

RAB_Gedung OK dan VK 121


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Tulangan U24 4.1.1.17.a 322.74 Kg
- Bekisting Sloof 4.1.1.21.a 97.93 M²
4 Sloof Uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.71 M³
- Tulangan U32 4.1.1.17.b 100.11 Kg
- Tulangan U24 4.1.1.17.a 37.92 Kg
- Bekisting Sloof 4.1.1.21.a 11.89 M²
5 Tutup Kolong Uk.10x30 cm (blk.35/60)
- Beton Ready Mix K-225 B. 13.f.2 2.57 M³
- Wiremesh M7 4.1.1.19 142.74 Kg
- Bekisting Sloof 4.1.1.21.a 51.35 M²
- Plesteran Tutup Kolong Uk.10x30 cm (blk.35/60) 4.4.2.4 37.83 M²
6 Tutup Kolong Uk.10/30 (blk.25/50)
- Beton Ready Mix K-225 B. 13.f.2 0.65 M³
- Wiremesh M7 4.1.1.17.b 34.62 Kg
- Bekisting Sloof 4.1.1.17.a 12.92 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.25/50) 4.4.2.4 8.71 M²
7 Tutup Kolong Uk.10/50 (blk.20/40)
- Beton Ready Mix K-225 B. 13.f.2 1.54 M³
- Wiremesh M7 4.1.1.19 76.87 Kg
- Bekisting Sloof 4.1.1.21.a 30.73 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 18.44 M²
8 Kolom K1 Uk. 45x45 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 20.66 M³
- Tulangan U32 4.1.1.17.b 3,612.60 Kg
- Tulangan U24 4.1.1.17.a 700.91 Kg
- Bekisting Kolom 4.1.1.22 b 183.60 M²

RAB_Gedung OK dan VK 122


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
9 Kolom K2 Uk. 30x30 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 2.59 M³
- Tulangan U32 4.1.1.17.b 454.75 Kg
- Tulangan U24 4.1.1.17.a 79.00 Kg
- Bekisting Kolom 4.1.1.22 b 34.56 M²
10 Kolom K3 Uk. 20x20 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 0.14 M³
- Tulangan U32 4.1.1.17.b 56.84 Kg
- Tulangan U24 4.1.1.17.a 5.93 Kg
- Bekisting Kolom 4.1.1.22 b 2.88 M²
11 Kolom K2 Uk. 20x40 cm (L) Lt.1
- Beton Ready Mix K-225 B. 13.f.2 0.96 M³
- Tulangan U32 4.1.1.17.b 166.74 Kg
- Tulangan U24 4.1.1.17.a 61.62 Kg
- Bekisting Kolom 4.1.1.22 b 9.60 M²
12 Kolom Praktis Uk.9x9 cm Lt.1
- Beton K175 4.1.1.4 6.50 M³
- Tulangan U24 4.1.1.17.a 1,620.76 Kg
- Bekisting 4.1.1.20.a 144.50 M²
13 Balok Praktis Uk.9x9 cm Lt.1 (dinding)
- Beton K175 4.1.1.4 0.47 M³
- Tulangan U24 4.1.1.17.a 115.98 Kg
- Bekisting 4.1.1.20.a 10.43 M²
Struktur Lantai 1
Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.325
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.94 M³
- Tulangan U32 4.1.1.17.b 779.08 Kg
- Tulangan U24 4.1.1.17.a 274.56 Kg
- Bekisting Balok 4.1.1.23.b 86.78 M²
2 List Plat Dack elv. 3.360
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 13.44 M³
- Wiremesh 2xM7 4.1.1.19 738.92 Kg
- Bekisting Lantai 4.1.1.24.b 156.58 M²
- Plesteran List Plat Dack elv. 3.360 4.4.2.4 279.93 M²
3 Balok Uk. 35x60 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 51.79 M³
- Tulangan U32 4.1.1.17.b 10,359.79 Kg
- Tulangan U24 4.1.1.17.a 2,070.46 Kg
- Bekisting Balok 4.1.1.23.b 399.52 M²
4 Balok Uk. 25x50 cm Lt.2

RAB_Gedung OK dan VK 123


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 21.27 M³
- Tulangan U32 4.1.1.17.b 2,849.91 Kg
- Tulangan U24 4.1.1.17.a 728.52 Kg
- Bekisting Balok 4.1.1.23.b 223.29 M²
5 Balok Uk. 20x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.95 M³
- Tulangan U32 4.1.1.17.b 930.70 Kg
- Tulangan U24 4.1.1.17.a 305.30 Kg
- Bekisting Balok 4.1.1.23.b 92.63 M²
6 Balok Uk. 15x60 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.46 M³
- Tulangan U32 4.1.1.17.b 826.13 Kg
- Tulangan U24 4.1.1.17.a 295.43 Kg
- Bekisting Balok 4.1.1.23.b 99.07 M²
6 Balok Uk. 15x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.71 M³
- Tulangan U32 4.1.1.17.b 99.81 Kg
- Tulangan U24 4.1.1.17.a 37.81 Kg
- Bekisting Balok 4.1.1.23.b 11.85 M²
7 Kolom K1 Uk. 45x45 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 34.63 M³
- Tulangan U32 4.1.1.17.b 4,896.81 Kg
- Tulangan U24 4.1.1.17.a 1,154.96 Kg
- Bekisting Kolom 4.1.1.22 b 307.78 M²

RAB_Gedung OK dan VK 124


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
8 Kolom K2 Uk. 30x30 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.48 M³
- Tulangan U32 4.1.1.17.b 454.75 Kg
- Tulangan U24 4.1.1.17.a 104.91 Kg
- Bekisting Kolom 4.1.1.22 b 46.37 M²
9 Kolom K3 Uk. 20x20 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.80 M³
- Tulangan U32 4.1.1.17.b 251.63 Kg
- Tulangan U24 4.1.1.17.a 32.42 Kg
- Bekisting Kolom 4.1.1.22 b 15.94 M²
10 Kolom K4 Uk. 15x15 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.66 M³
- Tulangan U32 4.1.1.17.b 677.30 Kg
- Tulangan U24 4.1.1.17.a 175.12 Kg
- Bekisting Kolom 4.1.1.22 b 48.75 M²
11 Kolom K2 Uk. 20x40 cm (L) Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.70 M³
- Tulangan U32 4.1.1.17.b 283.46 Kg
- Tulangan U24 4.1.1.17.a 112.79 Kg
- Bekisting Kolom 4.1.1.22 b 9.60 M²
12 Kolom Praktis Uk.9x9 cm Lt.2
- Beton K175 4.1.1.4 8.61 M³
- Tulangan U24 4.1.1.17.a 2,140.52 Kg
- Bekisting 4.1.1.20.a 191.27 M²
13 Balok Praktis Uk.9x9 cm Lt.2
- Beton K175 4.1.1.4 0.72 M³
- Tulangan U24 4.1.1.17.a 177.76 Kg
- Bekisting 4.1.1.20.a 15.98 M²
elv.4.500
14 Balok Uk. 15x40 cm elv.4.5
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.60 M³
- Tulangan U32 4.1.1.17.b 716.23 Kg
- Tulangan U24 4.1.1.17.a 260.94 Kg
- Bekisting Balok 4.1.1.23.b 82.46 M²
15 Kolom Praktis Uk.9x9 cm elv.4.5
- Beton K175 4.1.1.4 0.16 M³
- Tulangan U24 4.1.1.17.a 41.61 Kg
- Bekisting 4.1.1.20.a 3.60 M²
15 List Plat Dack elv. 4.5
- Beton Ready Mix K-225 menggunakan pompa B. 13.g.1 7.77 M³
- Wiremesh 2xM7 4.1.1.19 695.13 Kg

RAB_Gedung OK dan VK 125


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Bekisting Lantai 4.1.1.24.b 100.36 M²
- Plesteran List Plat Dack elv. 4.5 4.4.2.4 139.04 M²
elv.7.2
16 Balok List dack Uk.20x40 elv.7.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.20 M³
- Tulangan U32 4.1.1.17.b 34.50 Kg
- Tulangan U24 4.1.1.17.a 9.06 Kg
- Bekisting Balok 4.1.1.23.b 2.63 M²
17 Balok List dack Uk.15x40 elv.7.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.21 M³
- Tulangan U32 4.1.1.17.b 675.96 Kg
- Tulangan U24 4.1.1.17.a 245.80 Kg
- Bekisting Balok 4.1.1.23.b 98.38 M²
Elv.7.60
18 Balok uk. 20x80 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 7.18 M³
- Tulangan U32 4.1.1.17.b 1,064.53 Kg
- Tulangan U24 4.1.1.17.a 218.23 Kg
- Bekisting Balok 4.1.1.23.b 51.32 M²
19 Balok uk. 25x50 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.86 M³
- Tulangan U32 4.1.1.17.b 125.69 Kg
- Tulangan U24 4.1.1.17.a 29.95 Kg
- Bekisting Balok 4.1.1.23.b 9.03 M²

RAB_Gedung OK dan VK 126


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
20 Balok uk. 20x40 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.56 M³
- Tulangan U32 4.1.1.17.b 166.28 Kg
- Tulangan U24 4.1.1.17.a 51.91 Kg
- Bekisting Balok 4.1.1.23.b 19.56 M²
21 Plat Dack elv. 7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.67 M³
- Wiremesh 2xM7 4.1.1.19 556.28 Kg
- Bekisting Lantai 4.1.1.24.b 50.37 M²
- Plesteran Plat Dack elv. 7.60 4.4.2.4 50.37 M²
- Acian Plat Dack elv. 7.60 4.4.2.27 50.37 M²
- Waterproofing Plat Dack elv. 7.60 A.4.7.1.10.f 50.37 M²
Elv.8.00
21 Balok Praktis uk.9x9 cm Elv.8.00
- Beton K175 4.1.1.4 0.24 M³
- Tulangan U24 4.1.1.17.a 61.25 Kg
- Bekisting 4.1.1.20.a 5.34 M²
Elv.8.980
22 Balok Dack uk. 35x60 cm Elv.8.980
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 26.90 M³
- Tulangan U32 4.1.1.17.b 5,303.80 Kg
- Tulangan U24 4.1.1.17.a 1,075.82 Kg
- Bekisting Balok 4.1.1.23.b 207.50 M²
23 Balok Dack uk. 25x55 cm Elv.8.980
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 15.81 M³
- Tulangan U32 4.1.1.17.b 1,920.06 Kg
- Tulangan U24 4.1.1.17.a 518.53 Kg
- Bekisting Balok 4.1.1.23.b 161.58 M²
24 Balok Dack uk. 25x50 cm Elv.8.980
- Beton Ready Mix K-K-225 menggunakan pompa B. 13.f.1 13.52 M³
- Tulangan U32 4.1.1.17.b 1,752.25 Kg
- Tulangan U24 4.1.1.17.a 463.40 Kg
- Bekisting Balok 4.1.1.23.b 141.98 M²
25 Balok Dack uk. 20x45 cm Elv.8.980
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.95 M³
- Tulangan U32 4.1.1.17.b 209.38 Kg
- Tulangan U24 4.1.1.17.a 56.92 Kg
- Bekisting Balok 4.1.1.23.b 20.48 M²
26 Balok Dack uk. 20x40 cm Elv.8.980
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.83 M³
- Tulangan U32 4.1.1.17.b 108.67 Kg

RAB_Gedung OK dan VK 127


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Tulangan U24 4.1.1.17.a 36.64 Kg
- Bekisting Balok 4.1.1.23.b 11.01 M²
27 Balok Dack uk. 15x40 cm Elv.8.980
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.75 M³
- Tulangan U32 4.1.1.17.b 666.02 Kg
- Tulangan U24 4.1.1.17.a 250.27 Kg
- Bekisting Balok 4.1.1.23.b 79.09 M²
27 Plat Dack elv. 9.90
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 62.12 M³
- Wiremesh 2xM7 4.1.1.19 5,180.81 Kg
- Bekisting Lantai 4.1.1.24.b 475.03 M²
- Plesteran Plat Dack elv. 9.8 4.4.2.4 950.06 M²
- Acian Plat Dack elv. 9.8 4.4.2.27 475.03 M²
- Waterproofing Plat Dack elv. 9.8 A.4.7.1.10.f 475.03 M²
Elv.10.50
28 Balok uk. 20x40 cm Elv.10.50
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 9.41 M³
- Tulangan U32 4.1.1.17.b 988.85 Kg
- Tulangan U24 4.1.1.17.a 310.08 Kg
- Bekisting Balok 4.1.1.23.b 117.60 M²
Elv.11.480
29 Balok uk. 20x45 cm Elv.11.480
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.93 M³
- Tulangan U32 4.1.1.17.b 372.48 Kg
- Tulangan U24 4.1.1.17.a 114.32 Kg
- Bekisting Balok 4.1.1.23.b 41.28 M²

RAB_Gedung OK dan VK 128


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
30 Balok uk. 20x40 cm Elv.11.480
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.36 M³
- Tulangan U32 4.1.1.17.b 96.24 Kg
- Tulangan U24 4.1.1.17.a 12.35 Kg
- Bekisting Balok 4.1.1.23.b 4.54 M²
31 Balok uk. 15/40 cm Elv.11.480
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.49 M³
- Tulangan U32 4.1.1.17.b 68.84 Kg
- Tulangan U24 4.1.1.17.a 26.19 Kg
- Bekisting Balok 4.1.1.23.b 8.18 M²
32 Plat Dack elv. 11.480
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 5.11 M³
- Wiremesh 2xM7 4.1.1.19 426.17 Kg
- Bekisting Lantai 4.1.1.24.b 38.73 M²
- Plesteran Plat Dack elv. 11.480 4.4.2.4 77.46 M²
- Acian Plat Dack elv. 11.480 4.4.2.27 38.73 M²
- Waterproofing Plat Dack elv. 11.480 A.4.7.1.10.f 38.73 M²
Struktur Lantai 2
Sub Jumlah III
IV PEKERJAAN PLAT LANTAI
1 Plat Lantai 1
- Beton Ready Mix K-225 t =12 cm B. 13.f.2 110.43 M³
- Wiremesh 2xM7 4.1.1.19 7,674.80 Kg
- Bekisting Lantai 4.1.1.24.c 655.36 M²
2 Plat Lantai 2
- Beton Ready Mix K-225 t =12 cm menggunakan pompa B. 13.f.1 121.13 M³
- Wiremesh 2xM7 4.1.1.19 8,418.31 Kg
- Bekisting Lantai 4.1.1.24.b 744.41 M²
Sub Jumlah IV
V PEKERJAAN TANGGA
Tangga Type T1 (1 Unit)
1 Balok Bordes uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.16 M³
- Tulangan U32 4.1.1.17.b 25.26 Kg
- Tulangan U24 4.1.1.17.a 9.84 Kg
- Bekisting Balok 4.1.1.23.b 3.24 M²
- Plesteran Balok Bordes 15/40 4.4.2.4 3.24 M²
2 Plat Bordes
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³
- Tulangan U24 4.1.1.17.a 86.78 Kg
- Bekisting Balok 4.1.1.23.b 3.31 M²

RAB_Gedung OK dan VK 129


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Plesteran Bawah Plat Bordes 4.4.2.4 3.31 M²
3 Plat Tangga
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 1.60 M³
- Tulangan U24 4.1.1.17.a 306.00 Kg
- Bekisting Plat 4.1.1.24.b 22.89 M²
- Plesteran Bawah Plat tangga 4.4.2.4 22.89 M²
4 Anak Tangga
- Beton Ready Mix K-225 B. 13.f.2 0.86 M³
- Wiremesh M7 4.1.1.19 172.64 Kg
- Bekisting 4.1.1.21.a 5.76 M²
Tangga Type T2 (1 Unit)
1 Balok Bordes uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.16 M³
- Tulangan U32 4.1.1.17.b 25.26 Kg
- Tulangan U24 4.1.1.17.a 9.84 Kg
- Bekisting Balok 4.1.1.23.b 3.24 M²
- Plesteran Balok Bordes 15/40 4.4.2.4 3.24 M²
2 Plat Bordes
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³
- Tulangan U24 4.1.1.17.a 86.78 Kg
- Bekisting Balok 4.1.1.23.b 6.40 M²
- Plesteran Bawah Bordes 4.4.2.4 6.40 M²
3 Plat Tangga
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 2.07 M³
- Tulangan U24 4.1.1.17.a 394.96 Kg
- Bekisting Plat 4.1.1.24.b 29.60 M²
- Plesteran Bawah Plat tangga 4.4.2.4 29.60 M²

RAB_Gedung OK dan VK 130


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
4 Anak Tangga
- Beton Ready Mix K-225 B. 13.f.2 1.12 M³
- Wiremesh M7 4.1.1.19 223.28 Kg
- Bekisting 4.1.1.21.a 7.45 M²
Sub Jumlah V
VI PEKERJAAN ATAP
1 Rangka Atap Baja Ringan Zincallume 8.1.1.3. 892.22 M2
2 Atap Zincallume Color t =0,35 mm A.4.5.2.41.b 892.22 M2
3 Prabung Atap Zincallume A.4.5.2.42.a 64.20 M
4 List Plank Woodplak 2 lps 8.1.1.4. 117.25 M
Sub Jumlah VI
JUMLAH TOTAL PEKERJAAN STRUKTUR GEDUNG
B PEKERJAAN STRUKTUR SELASAR DAN RAMP
I PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank 2.2.1.4.a 155.40 M'
Sub Jumlah I
II PEKERJAAN PONDASI
1 Pengadaan Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, 8 D U&B 291.00 Btg
13, ø 6 K 450 -6 m
2 Pemancangan Mini Pile 25 x 25 K450 1,746.00 M'
3 Pembobokan Mini Pile 97.00 Titik
4 Galian Tanah Pondasi 2.3.1.1 50.76 M³
5 Urugan Pasir t = 10 cm 2.3.1.11 5.97 M³
6 Lantai Kerja t = 5 cm 4.1.1.4 2.99 M³
7 Poer Type P1
- Beton Ready Mix K-300 B. 13.i.2 1.36 M³
- Tulangan U32 4.1.1.17.b 148.27 Kg
- Bekisting Pondasi 4.1.1.20.a 9.07 M²
8 Poer Type P2
- Beton Ready Mix K-300 B. 13.i.2 32.03 M³
- Tulangan U32 4.1.1.17.b 2,733.78 Kg
- Bekisting Pondasi 4.1.1.20.a 121.40 M²
9 Poer Type P3
- Beton Ready Mix K-300 B. 13.i.2 4.23 M³
- Tulangan U32 4.1.1.17.b 285.73 Kg
- Bekisting Pondasi 4.1.1.20.a 10.77 M²
10 Kolom Pondasi K2 Uk. 30x30 cm
- Beton Ready Mix K-225 B. 13.f.2 2.84 M³
- Tulangan U32 4.1.1.17.b 1,219.30 Kg
- Tulangan U24 4.1.1.17.a 161.16 Kg
- Bekisting Pondasi 4.1.1.20.a 37.80 M²

RAB_Gedung OK dan VK 131


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
Sub Jumlah II
III PEKERJAAN STRUKTUR
Struktur Lantai 1
1 Sloof Uk. 25x55 cm
- Beton Ready Mix K-225 B. 13.f.2 6.39 M³
- Tulangan U32 4.1.1.17.b 773.08 Kg
- Tulangan U24 4.1.1.17.a 209.80 Kg
- Bekisting Sloof 4.1.1.21.a 65.30 M²
2 Sloof Uk. 25x50 cm
- Beton Ready Mix K-225 B. 13.f.2 1.33 M³
- Tulangan U32 4.1.1.17.b 186.83 Kg
- Tulangan U24 4.1.1.17.a 45.83 Kg
- Bekisting Sloof 4.1.1.21.a 13.92 M²
3 Sloof Uk. 20x40 cm
- Beton Ready Mix K-225 B. 13.f.2 10.24 M³
- Tulangan U32 4.1.1.17.b 1,447.84 Kg
- Tulangan U24 4.1.1.17.a 449.68 Kg
- Bekisting Sloof 4.1.1.21.a 136.51 M²
4 Tutup Kolong Uk. 10x45 (blk.25/55)
- Beton Ready Mix K-225 B. 13.f.2 2.59 M³
- Wiremesh M7 4.1.1.19 97.31 Kg
- Bekisting Sloof 4.1.1.21.a 51.87 M²
- Plesteran Tutup Kolong Uk. 10x35 (blk.25/55) 4.4.2.4 33.66 M²

RAB_Gedung OK dan VK 132


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
5 Tutup Kolong Uk. 10x40 (blk.25/50)
- Beton Ready Mix K-225 B. 13.f.2 0.53 M³
- Wiremesh M7 4.1.1.19 27.65 Kg
- Bekisting Sloof 4.1.1.21.a 10.61 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 7.40 M²
6 Tutup Kolong Uk.10/50 (blk.20/40)
- Beton Ready Mix K-225 B. 13.f.2 2.87 M³
- Wiremesh M7 4.1.1.19 143.76 Kg
- Bekisting Sloof 4.1.1.21.a 57.46 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 34.48 M²
7 Kolom K2 Uk. 30x30 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 14.54 M³
- Tulangan U32 4.1.1.17.b 2,415.87 Kg
- Tulangan U24 4.1.1.17.a 442.07 Kg
- Bekisting Kolom 4.1.1.22 b 193.80 M²
Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.360
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 5.00 M³
- Tulangan U32 4.1.1.17.b 571.89 Kg
- Tulangan U24 4.1.1.17.a 197.97 Kg
- Bekisting Balok 4.1.1.23.b 62.55 M²
2 List Plat Dack elv. 3.360
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 7.67 M³
- Wiremesh 2xM7 4.1.1.19 584.98 Kg
- Bekisting Lantai 4.1.1.24.b 94.21 M²
- Plesteran List Plat Dack elv. 3.360 4.4.2.4 162.12 M²
3 Balok Uk. 25x55 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.25 M³
- Tulangan U32 4.1.1.17.b 773.08 Kg
- Tulangan U24 4.1.1.17.a 205.41 Kg
- Bekisting Balok 4.1.1.23.b 63.93 M²
4 Balok Uk. 20x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 26.32 M³
- Tulangan U32 4.1.1.17.b 3,576.49 Kg
- Tulangan U24 4.1.1.17.a 1,110.06 Kg
- Bekisting Balok 4.1.1.23.b 330.34 M²
5 Kolom K2 Uk. 30x30 cm (elv.4.00-8.00) Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 14.22 M³
- Tulangan U32 4.1.1.17.b 2,197.97 Kg
- Tulangan U24 4.1.1.17.a 431.87 Kg
- Bekisting Kolom 4.1.1.22 b 189.60 M²

RAB_Gedung OK dan VK 133


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
Elv.7.60
6 Balok uk. 20x80 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 13.98 M³
- Tulangan U32 4.1.1.17.b 2,028.43 Kg
- Tulangan U24 4.1.1.17.a 423.51 Kg
- Bekisting Balok 4.1.1.23.b 99.89 M²
7 Balok uk. 25x55 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.03 M³
- Tulangan U32 4.1.1.17.b 124.30 Kg
- Tulangan U24 4.1.1.17.a 34.06 Kg
- Bekisting Balok 4.1.1.23.b 10.49 M²
8 Balok uk. 20x40 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 8.51 M³
- Tulangan U32 4.1.1.17.b 906.03 Kg
- Tulangan U24 4.1.1.17.a 280.40 Kg
- Bekisting Balok 4.1.1.23.b 106.36 M²
9 Plat Dack elv. 7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 22.80 M³
- Wiremesh 2xM7 4.1.1.19 1,901.52 Kg
- Bekisting Lantai 4.1.1.24.b 176.26 M²
- Plesteran Plat Dack elv.7.60 4.4.2.4 176.26 M²
- Acian Plat Dack elv. 7.60 4.4.2.27 176.26 M²
- Waterproofing Plat Dack elv. 7.60 A.4.7.1.10.f 176.26 M²

RAB_Gedung OK dan VK 134


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
Elv.7.95
10 Balok Uk. 20x45 elv.6.8
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.79 M³
- Tulangan U32 4.1.1.17.b 84.13 Kg
- Tulangan U24 4.1.1.17.a 23.29 Kg
- Bekisting Balok 4.1.1.23.b 8.32 M²
11 Balok Uk. 20x40 elv.6.8
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 2.88 M³
- Tulangan U32 4.1.1.17.b 396.01 Kg
- Tulangan U24 4.1.1.17.a 126.51 Kg
- Bekisting Balok 4.1.1.23.b 38.34 M²
Elv.8.00
12 Kolom Praktis Uk.9x9 cm elv.8.00
- Beton K175 4.1.1.4 0.08 M³
- Tulangan U24 4.1.1.17.a 20.73 Kg
- Bekisting 4.1.1.20.a 1.73 M²
13 Balok Praktis Uk.9x9 cm elv.8.00
- Beton K175 4.1.1.4 0.55 M³
- Tulangan U24 4.1.1.17.a 141.57 Kg
- Bekisting 4.1.1.20.a 12.73 M²
14 List & Plat Dack elv. 8.00
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 14.78 M³
- Wiremesh 2xM7 4.1.1.19 1,121.53 Kg
- Bekisting Lantai 4.1.1.24.b 122.91 M²
- Plesteran List Plat Dack 4.4.2.4 268.95 M²
Sub Jumlah III
IV PEKERJAAN PLAT LANTAI
1 Plat Lantai 1
- Beton Ready Mix K-225 t = 10 cm B. 13.f.2 29.66 M³
- Wiremesh 2xM7 4.1.1.19 2,473.98 Kg
- Bekisting Lantai 4.1.1.24.c 246.14 M²
2 Plat Lantai 2
- Beton Ready Mix K-225 t = 10 cm menggunakan pompa B. 13.f.1 29.66 M³
- Wiremesh 2xM7 4.1.1.19 2,473.98 Kg
- Bekisting Lantai 4.1.1.24.b 200.98 M²
Sub Jumlah IV
V PEKERJAAN ATAP
1 Rangka Atap Baja Ringan Zincallume 8.1.1.3. 111.72 M2
2 Atap Zincallume Color t =0,35 mm A.4.5.2.41.b 111.72 M2
3 Prabung Atap Zincallume A.4.5.2.42.a 27.46 M
4 List Plank Woodplak 2 lps 8.1.1.4. 54.80 M

RAB_Gedung OK dan VK 135


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
Sub Jumlah V
JUMLAH TOTAL PEKERJAAN STRUKTUR SELASAR DAN RAMP
C PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
A Lantai 1
1 Pas. Dinding Batako A.4.4.1.19.a 1,224.12 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 2,351.61 m2
3 Pas. Dinding Keramik 20x40 Cm A.4.4.3.54.a 310.53 m2
4 Pas. Dinding Wastafel Keramik 30x30 Motif A.4.4.3.35.a 9.18 m2
5 Pas. Dinding Partisi Cubical U&B 2.00 Unit

B Lantai 2
1 Pas. Dinding Batako A.4.4.1.19.a 1,158.21 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 1,946.91 m2
3 Pas. Dinding Keramik 20x40 Cm A.4.4.3.54.a 127.30 m2
4 Pas. Dinding Wastafel Keramik 30x30 Motif A.4.4.3.35.a 6.20 m2

C Lantai Atap
1 Pas. Dinding Batako A.4.4.1.19.a 277.45 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 554.90 m2

D Koridor, Gas Medis, & RAM Tangga


1 Pas. Dinding Batako A.4.4.1.19.a 850.70 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 1,707.74 m2
Sub Jumlah I

RAB_Gedung OK dan VK 136


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
IIPEKERJAAN LANTAI
A Lantai 1
1 Pas. Lantai Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 329.65 m2
2 Pas. Lantai Keramik 60x60 Cm Unpolised Tekstur Kasar Warna Gelap A.4.4.3.34.b 110.02 m2
3 Pas. Lantai Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 16.56 m2
4 Pas. Lantai Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 605.17 m2
5 Pas. Lantai Keramik 30x30 Cm Polised A.4.4.3.35.a 142.28 m2
6 Pas. Lantai Keramik 30x30 Cm Unpolised A.4.4.3.35.a 60.36 m2
7 Pas. Lantai Tangga
a. Pas. Lantai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 43.93 m2
b. Stepnosing A.4.4.3.41 84.00 m'
8 Pas. Hospital Plint A.4.4.3.21 473.25 m'

B Lantai 2
1 Pas. Lantai Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 275.09 m2
2 Pas. Lantai Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 3.60 m2
3 Pas. Lantai Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 93.64 m2
4 Pas. Lantai Keramik 30x30 Cm Polised A.4.4.3.35.a 132.95 m2
5 Pas. Lantai Keramik 30x30 Cm Unpolised A.4.4.3.35.a 21.01 m2
6 Pas. Lantai Vinyl Homogeneous Heavy Duty Khusus R.OK A.4.4.3.59.a 649.61 m2
7 Pas. Lantai Tangga
a. Pas. Lantai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 24.35 m2
b. Stepnosing A.4.4.3.41 46.56 m'
8 Pas. Hospital Plint A.4.4.3.21 584.47 m'
Sub Jumlah II
III PEKERJAAN PLAFON
A Lantai 1
1 Pas. Plafond Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 1,142.13 m2
2 Pas. Plafond GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 59.51 m2

B Lantai 2
1 Pas. Plafond Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 985.18 m2
2 Pas. Plafond GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 20.45 m2
Sub Jumlah III
IV PEKERJAAN PINTU DAN JENDELA
A Lantai 1
Pintu :
1 PU1 234x250 cm (Kaca Tempered Frameless 12mm) U&B 2.00 Unit
- Pas. ACP Gawang U&B 65.41 m2

2 PD1 167,5x270 cm (Kaca Tempered Frameless 12mm) U&B 3.00 Unit

RAB_Gedung OK dan VK 137


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5

3 PD2 167,5x270 cm 10.00 Unit


- Kusen A.4.2.1.11 92.50 m'
- Daun Pintu A.4.6.1.8.a 35.25 m2
- Engsel Pintu A.4.6.2.5 80.00 Set
- Pull Handle A.4.6.2.11.a 20.00 Set
- Kunci lockcase A.4.6.2.1.a 10.00 Set
- Door Stoper A.4.6.2.13 20.00 Set
- Door Closer A.4.6.2.10 20.00 Set
- Kaca 5 mm A.4.6.2.17 9.60 m2

4 P1 97,5x270 cm 4.00 Unit


- Kusen A.4.2.1.11 29.40 m'
- Daun Pintu A.4.6.1.8.a 7.94 m2
- Engsel Pintu A.4.6.2.5 16.00 Set
- Lever Handle A.4.6.2.11.a 4.00 Set
- Kunci lockcase A.4.6.2.1.a 4.00 Set
- Door Stoper A.4.6.2.13 4.00 Set
- Door Closer A.4.6.2.10 4.00 Set
- Kaca 5 mm A.4.6.2.17 2.43 m2

RAB_Gedung OK dan VK 138


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
5 P2 87,5x270 cm 13.00 Unit
- Kusen A.4.2.1.11 92.95 m'
- Daun Pintu A.4.6.1.8.a 25.02 m2
- Engsel Pintu A.4.6.2.5 52.00 Set
- Lever Handle A.4.6.2.11.a 13.00 Set
- Kunci lockcase A.4.6.2.1.a 13.00 Set
- Door Stoper A.4.6.2.13 13.00 Set
- Door Closer A.4.6.2.10 13.00 Set
- Kaca 5 mm A.4.6.2.17 5.20 m2

11 PS1 57,5x100 cm 1.00 Unit


- Kusen A.4.2.1.11 3.15 m'
- Daun Pintu A.4.6.1.8.a 0.57 m2
- Engsel Kupu-Kupu A.4.6.2.6 2.00 Set
- Handle : Pull Plate A.4.6.2.11.b 1.00 Set
- Kunci Pintu Window bolt with key A.4.6.2.4.a 1.00 Set

12 PS2 107,5x100 cm 1.00 Unit


- Kusen A.4.2.1.11 6.15 m'
- Daun Pintu A.4.6.1.8.a 1.07 m2
- Engsel Kupu-Kupu A.4.6.2.6 4.00 Set
- Handle : Pull Plate A.4.6.2.11.b 1.00 Set
- Kunci Pintu Window bolt with key A.4.6.2.4.a 1.00 Set

13 PT1 80x220 cm 5.00 Unit


- Kusen A.4.2.1.11 26.00 m'
- Daun Pintu A.4.6.1.8.a 8.08 m2
- Engsel Pintu A.4.6.2.5 15.00 Set
- Lever Handle A.4.6.2.11.a 5.00 Set
- Kunci lockcase A.4.6.2.1.a 5.00 Set
- Door Stoper A.4.6.2.13 5.00 Set

13 PT2 90x220 cm 8.00 Unit


- Kusen A.4.2.1.11 42.40 m'
- Daun Pintu A.4.6.1.8.a 14.34 m2
- Engsel Pintu A.4.6.2.5 24.00 Set
- Lever Handle A.4.6.2.11.a 8.00 Set
- Kunci lockcase A.4.6.2.1.a 8.00 Set
- Door Stoper A.4.6.2.13 8.00 Set

Jendela :

RAB_Gedung OK dan VK 139


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
1 J1 360x220 cm 6.00 Unit
- Kusen A.4.2.1.11 152.40 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 10.52 m2
- Kaca 5 mm A.4.6.2.17 33.82 m2
- Casement Handle A.4.6.2.11.b 12.00 Set
- Friction Stay A.4.6.2.9 24.00 Set

2 J2 240x220 cm 1.00 Unit


- Kusen A.4.2.1.11 18.40 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2
- Kaca 5 mm A.4.6.2.17 4.14 m2
- Casement Handle A.4.6.2.11.b 1.00 Set
- Friction Stay A.4.6.2.9 2.00 Set

3 J2A 240x270 cm 3.00 Unit


- Kusen A.4.2.1.11 61.20 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 2.32 m2
- Kaca 5 mm A.4.6.2.17 15.90 m2
- Casement Handle A.4.6.2.11.b 3.00 Set
- Friction Stay A.4.6.2.9 6.00 Set

4 J3 174x220 cm 16.00 Unit


- Kusen A.4.2.1.11 216.96 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 13.21 m2
- Kaca 5 mm A.4.6.2.17 43.61 m2
- Casement Handle A.4.6.2.11.b 16.00 Set
- Friction Stay A.4.6.2.9 32.00 Set

RAB_Gedung OK dan VK 140


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5

5 JM1 360x120 cm 2.00 Unit


- Kusen A.4.2.1.11 26.40 m'
- Kaca 5 mm A.4.6.2.17 7.83 m2

6 JM2 174x120 cm 3.00 Unit


- Kusen A.4.2.1.11 21.24 m'
- Kaca 5 mm A.4.6.2.17 5.81 m2

7 JM3 174x120 cm 2.00 Unit


- Kusen A.4.2.1.11 14.16 m'
- Kaca 5 mm A.4.6.2.17 3.87 m2

11 V1 70x54 cm 1.00 Unit


- Kusen A.4.2.1.11 2.48 m'
- Kaca 5 mm A.4.6.2.17 0.39 m2

11 V2 140x54 cm 1.00 Unit


- Kusen A.4.2.1.11 4.42 m'
- Kaca 5 mm A.4.6.2.17 0.80 m2

B Lantai 2
Pintu :
1 PU1 234x250 cm (Kaca Tempered Frameless 12mm) U&B 1.00 Unit
- Pas. ACP Gawang U&B 32.70 m2

2 PD2 167,5x270 cm 13.00 Unit


- Kusen A.4.2.1.11 120.25 m'
- Daun Pintu A.4.6.1.8.a 45.82 m2
- Engsel Pintu A.4.6.2.5 104.00 Set
- Pull Handle A.4.6.2.11.a 26.00 Set
- Kunci lockcase A.4.6.2.1.a 13.00 Set
- Door Stoper A.4.6.2.13 26.00 Set
- Door Closer A.4.6.2.10 26.00 Set
- Kaca 5 mm A.4.6.2.17 12.48 m2

3 P1A 140x270 cm 1.00 Unit


- Kusen A.4.2.1.11 8.86 m'
- Daun Pintu Kaca A.4.2.1.13.b 3.25 m2
- Engsel Pintu A.4.6.2.5 8.00 Set
- Pull Handle A.4.6.2.11.a 2.00 Set

RAB_Gedung OK dan VK 141


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 2.00 Set
- Door Closer A.4.6.2.10 2.00 Set
- Kaca 5 mm A.4.6.2.17 0.80 m2

4 P2 87,5x270 cm 17.00 Unit


- Kusen A.4.2.1.11 121.55 m'
- Daun Pintu A.4.6.1.8.a 32.72 m2
- Engsel Pintu A.4.6.2.5 68.00 Set
- Lever Handle A.4.6.2.11.a 17.00 Set
- Kunci lockcase A.4.6.2.1.a 17.00 Set
- Door Stoper A.4.6.2.13 17.00 Set
- Door Closer A.4.6.2.10 17.00 Set
- Kaca 5 mm A.4.6.2.17 6.80 m2

5 P5 87,5x220 cm 2.00 Unit


- Kusen A.4.2.1.11 10.55 m'
- Daun Pintu A.4.6.1.8.a 3.85 m2
- Engsel Pintu A.4.6.2.5 8.00 Set
- Lever Handle A.4.6.2.11.a 2.00 Set
- Kunci lockcase A.4.6.2.1.a 2.00 Set
- Door Stoper A.4.6.2.13 2.00 Set
- Door Closer A.4.6.2.10 2.00 Set

RAB_Gedung OK dan VK 142


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
6 P6 77,5x220 cm 1.00 Unit
- Kusen A.4.2.1.11 5.17 m'
- Daun Pintu A.4.6.1.8.a 1.70 m2
- Engsel Pintu A.4.6.2.5 4.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set
- Door Closer A.4.6.2.10 1.00 Set

7 PS1 57,5x100 cm 1.00 Unit


- Kusen A.4.2.1.11 3.15 m'
- Daun Pintu A.4.6.1.8.a 0.57 m2
- Engsel Kupu-Kupu A.4.6.2.6 2.00 Set
- Handle : Pull Plate A.4.6.2.11.b 1.00 Set
- Kunci Pintu Window bolt with key A.4.6.2.4.a 1.00 Set

8 PS2 107,5x100 cm 1.00 Unit


- Kusen A.4.2.1.11 6.15 m'
- Daun Pintu A.4.6.1.8.a 1.07 m2
- Engsel Kupu-Kupu A.4.6.2.6 4.00 Set
- Handle : Pull Plate A.4.6.2.11.b 1.00 Set
- Kunci Pintu Window bolt with key A.4.6.2.4.a 1.00 Set

9 PT1 80x220 cm 3.00 Unit


- Kusen A.4.2.1.11 15.60 m'
- Daun Pintu A.4.6.1.8.a 4.85 m2
- Engsel Pintu A.4.6.2.5 9.00 Set
- Lever Handle A.4.6.2.11.a 3.00 Set
- Kunci lockcase A.4.6.2.1.a 3.00 Set
- Door Stoper A.4.6.2.13 3.00 Set

10 PT2 90x220 cm 1.00 Unit


- Kusen A.4.2.1.11 5.30 m'
- Daun Pintu A.4.6.1.8.a 1.79 m2
- Engsel Pintu A.4.6.2.5 3.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set

11 PT3 70x220 cm 4.00 Unit


- Kusen A.4.2.1.11 20.40 m'

RAB_Gedung OK dan VK 143


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Daun Pintu A.4.6.1.8.a 5.59 m2
- Engsel Pintu A.4.6.2.5 12.00 Set
- Lever Handle A.4.6.2.11.a 4.00 Set
- Kunci lockcase A.4.6.2.1.a 4.00 Set
- Door Stoper A.4.6.2.13 4.00 Set

12 PG4 80x220 cm 2.00 Unit


- Kusen A.4.2.1.11 8.30 m'
- Daun Pintu A.4.6.1.8.a 3.52 m2
- Roda Gantung U&B 4.00 Set
- Pull Plate Handle A.4.6.2.11.a 4.00 Set
- Kunci Lockcase Sliding A.4.6.2.1.a 2.00 Set

Jendela :
1 J1 360x220 cm 19.00 Unit
- Kusen A.4.2.1.11 482.60 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 33.33 m2
- Kaca 5 mm A.4.6.2.17 107.11 m2
- Casement Handle A.4.6.2.11.b 38.00 Set
- Friction Stay A.4.6.2.9 76.00 Set

2 J2 240x220 cm 1.00 Unit


- Kusen A.4.2.1.11 18.40 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2
- Kaca 5 mm A.4.6.2.17 4.14 m2
- Casement Handle A.4.6.2.11.b 1.00 Set
- Friction Stay A.4.6.2.9 2.00 Set

RAB_Gedung OK dan VK 144


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5

3 J2A 240x270 cm 1.00 Unit


- Kusen A.4.2.1.11 20.40 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2
- Kaca 5 mm A.4.6.2.17 5.30 m2
- Casement Handle A.4.6.2.11.b 1.00 Set
- Friction Stay A.4.6.2.9 2.00 Set

4 J3 174x220 cm 2.00 Unit


- Kusen A.4.2.1.11 27.12 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 1.65 m2
- Kaca 5 mm A.4.6.2.17 5.45 m2
- Casement Handle A.4.6.2.11.b 2.00 Set
- Friction Stay A.4.6.2.9 4.00 Set

5 J4 532x350 cm & 416x350 cm 1.00 Unit


- Kusen A.4.2.1.11 72.92 m'
- Kaca 8 mm A.4.6.2.18 31.02 m2

6 JM1 360x120 cm 4.00 Unit


- Kusen A.4.2.1.11 52.80 m'
- Kaca 5 mm A.4.6.2.17 15.66 m2

7 JM2 174x120 cm 6.00 Unit


- Kusen A.4.2.1.11 42.48 m'
- Kaca 5 mm A.4.6.2.17 11.62 m2

8 JM3 174x120 cm 4.00 Unit


- Kusen A.4.2.1.11 28.32 m'
- Kaca 5 mm A.4.6.2.17 7.75 m2

9 J01 120x70 cm (Anti Radiasi) A.RAD.05 1.00 Unit

10 V1 70x54 cm 2.00 Unit


- Kusen A.4.2.1.11 4.96 m'
- Kaca 5 mm A.4.6.2.17 0.79 m2

11 V2 140x54 cm 2.00 Unit


- Kusen A.4.2.1.11 8.84 m'
- Kaca 5 mm A.4.6.2.17 1.60 m2

RAB_Gedung OK dan VK 145


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
C Lantai Atap

Pintu :
1 P7 97,5x220 cm 3.00 Unit
- Kusen A.4.2.1.11 16.12 m'
- Daun Pintu A.4.6.1.8.a 6.43 m2
- Engsel Pintu A.4.6.2.5 12.00 Set
- Lever Handle A.4.6.2.11.a 3.00 Set
- Kunci lockcase A.4.6.2.1.a 3.00 Set
- Door Stoper A.4.6.2.13 3.00 Set
- Door Closer A.4.6.2.10 3.00 Set
Sub Jumlah IV
V PEKERJAAN SANITAIR
A Lantai 1
1 Pas. Closet Duduk tipe 1 A.5.1.1.1 14.00 set
2 Pas. Shower Spray A.5.1.1.19.a 14.00 set
3 Pas. Hand Shower A.5.1.1.19.c 4.00 set
4 Pas. Floor Drain A.5.1.1.14 16.00 set
5 Pas. Wastafel wall hung tipe 1 A.5.1.1.5 4.00 set
6 Pas. Wastafel wall hung tipe 2 A.5.1.1.5.a 21.00 set
7 Pas. Tempat Cuci Bayi A.5.1.1.5.b 6.00 set
8 Pas. Sink 1 Lubang dengan Petirasan A.5.1.1.12 1.00 set
9 Pas. Keran Pantry A.5.1.1.19 1.00 set
10 Pas. Grab bar U&B 12.00 set
11 Pas. Grab bar Difable U&B 4.00 set
12 Pas. Spoel Hoek A.5.1.1.1.a 1.00 set

RAB_Gedung OK dan VK 146


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
13 Pas. Slob Sink A.5.1.1.1.a 2.00 set
14 Pas. Scrub Up Sink Double Bay 1.00 set
- Konstruksi / Bahan Body
- Plat untuk pengoperasian kran air dan sabun dengan manual (pedal / lutut) : Plat SS 304 1.0 mm HL
- Ukuran : 1400-1800(w)x600(t)x1800(h) mm
- Power Supply : 220V AC
- Indikator Unit : Power Lamp / Heather Lamp
- Lampu UV : 2 x 30 W Unites 89 PM
- Ballast UV : 2 x 30 W/24V
- Automatic Sensor Soup : 2 Pcs Fotex CDR - 10X
- Bath Spout : 2 Pcs Stuchi Spol
- Automatic Sensor Water : 2 Pcs Fotex CDR - 30X
- Heater : 1 Pcs 1000 W AC 220V, suhu max 45° C
- Tube : 1 Pcs Pipa SS 304 Ø 4"
- Solenoid Valve : 2 Pcs Tipe DW-15 24V DC
- Hour Meter : 1 Pcs 24V DC
- Housing Filter : 2 Pcs
- Selang Flexible : SS alpi
- Adaptor : 1 Pcs 24V DC
15 Pas. Kaca Cermin 5 mm ex. Lokal A.4.6.2.20 19.23 m2
16 Pas. Meja Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.81 m3

B Lantai 2
1 Pas. Closet Duduk tipe 1 A.5.1.1.1 4.00 set
2 Pas. Shower Spray A.5.1.1.19.a 4.00 set
3 Pas. Fix Shower A.5.1.1.19.b 2.00 set
4 Pas. Keran A.5.1.1.19 2.00 set
5 Pas. Floor Drain A.5.1.1.14 9.00 set
6 Pas. Wastafel wall hung tipe 1 A.5.1.1.5 1.00 set
7 Pas. Wastafel wall hung tipe 2 A.5.1.1.5.a 6.00 set
8 Pas. Sink 1 Lubang dengan Petirasan A.5.1.1.12 2.00 set
9 Pas. Keran Pantry A.5.1.1.19 2.00 set
10 Pas. Grab bar U&B 1.00 set
11 Pas. Spoel Hoek A.5.1.1.1.a 1.00 set
12 Pas. Slob Sink A.5.1.1.1.a 2.00 set
13 Pas. Scrub Up Sink Double Bay 4.00 set
- Konstruksi / Bahan Body
- Plat untuk pengoperasian kran air dan sabun dengan manual (pedal / lutut) : Plat SS 304 1.0 mm HL
- Ukuran : 1400-1800(w)x600(t)x1800(h) mm
- Power Supply : 220V AC
- Indikator Unit : Power Lamp / Heather Lamp

RAB_Gedung OK dan VK 147


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Lampu UV : 2 x 30 W Unites 89 PM
- Ballast UV : 2 x 30 W/24V
- Automatic Sensor Soup : 2 Pcs Fotex CDR - 10X
- Bath Spout : 2 Pcs Stuchi Spol
- Automatic Sensor Water : 2 Pcs Fotex CDR - 30X
- Heater : 1 Pcs 1000 W AC 220V, suhu max 45° C
- Tube : 1 Pcs Pipa SS 304 Ø 4"
- Solenoid Valve : 2 Pcs Tipe DW-15 24V DC
- Hour Meter : 1 Pcs 24V DC
- Housing Filter : 2 Pcs
- Selang Flexible : SS alpi
- Adaptor : 1 Pcs 24V DC
Pas. Kaca Cermin 5 mm ex. Lokal A.4.6.2.20 3.51 m2
Pas. Meja Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.35 m3
Sub Jumlah V
VI PEKERJAAN PENGECATAN
A Lantai 1
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 426.25 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 1,333.88 m2
3 Cat Plafond A.4.7.1.10.a 761.97 m2

B Lantai 2
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 577.61 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 1,819.16 m2
3 Cat Plafond A.4.7.1.10.a 730.55 m2

RAB_Gedung OK dan VK 148


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
C Lantai Atap
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 645.64 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 178.69 m2

D Koridor, Gas Medis, & RAM Tangga


1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 1,473.98 m2
2 Cat Plafond A.4.7.1.10.a 439.67 m2
Sub Jumlah VI
VII PEKERJAAN LAIN-LAIN
A Lantai 1
1 Pekerjaan Tangga :
a. Pas. Handrail dan Railling tangga 1 A.4.2.1.20.a 22.74 m2
b. Pas. Handrail dan Railling tangga 2 A.4.2.1.20.a 24.04 m2
2 Interior Melekat Meja Konter Bahan Multipleks Fin. HPL 5.66 m'

B Lantai 2
1 Pekerjaan Tangga :
a. Pas. Handrail dan Railling ( Void ) A.4.2.1.20.a 26.12 m2
Sub Jumlah VII
VIII
ARSITEKTUR KHUSUS RUANG OK
1 Wall Medical Insulated Panel EPS, t. 75 mm, Antibacterial 250.63 m2
2 Ceiling Medical Insulated Panel EPS, t. 75 mm, Antibacterial 119.38 m2
3 Medical Plenum / RAG, tidak termasuk grille 12.00 Unit
4 Operating Timer (jam, countdown, temp, humidity), recessed on wall 3.00 Unit
- Ukuran : 850 (w) x 400 (h) x 350 (t) mm
- Running Text : Dot Matrix
- Sensor : Sesirion
- Daya : 40 W
5 Film Viewer, recessed on wall 3.00 Unit
- Ukuran : 800 (w) x 500 (h) x 45 (t) mm
- Kapasitas : 2 Film
- Frame dan Body : SS 304 HL 1.2 mm
- Lampu : LED Module 3 mata
- Pengaturan Kecerahan : Dimme / Rotary Switch
- Daya : DC 165 W / 12 V / 8,3 A
6 Passbox SS Mirror 304, recessed on wall 8.00 Unit
- Ukuran Luar : 700 (w) x 750 (h) x 600 (t) mm
- Bahan : SS SUS 304 Mirror, 1.2 mm
- System : Interlock Magnetic
- Pintu Kedua Sisi Pakai Kaca Clear 6 mm
- Daya : DC 220 W / 12 V / 4,2 A

RAB_Gedung OK dan VK 149


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
7 Single Swing Door Manual 2.00 Unit
- Ukuran Opening : 900 (w) x 2200 (h) mm
- Auto Bottom Seal
- Observation Glass : 400 (w) x 600 (h) mm, clear glass 8 mm
- Accessoris : Engsel, Lockset & Handle
8 Single Sliding Door Full Hermatic 3.00 Unit
- Ukuran Opening : 1600 (w) x 2200 (h) mm
- System Automatic
- Observation Glass : 400 (w) x 600 (h) mm, clear glass 8 mm
- Accessoris : Trackrell; Roda; Frame Door & Kusen
9 Single Sliding Door Full Hermatic 1.00 Unit
- Ukuran Opening : 1600 (w) x 2200 (h) mm
- System Automatic
- Accessoris : Trackrell; Roda; Frame Door & Kusen
Sub Jumlah VIII
IX ARSITEKTUR FASADE BANGUNAN
1 Pas. ACP Flat Tebal 0.3 mm + Pemasangan U&B 313.39 m2
2 Pas. Jalusi Aluminium U&B 81.43 m2
3 Pas. Signage :
- INSTALASI BERSALIN 975.80 cm
- INSTALASI BEDAH SENTRAL 1,205.40 cm
Sub Jumlah IX
JUMLAH TOTAL PEKERJAAN ARSITEKTUR

RAB_Gedung OK dan VK 150


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
D PEKERJAAN MEKANIKAL ELEKTRIKAL
01 Instalasi Penerangan dan Kotak Kontak Lantai 1 & Lantai 2
Kabel NYM 2 x 2.5 mm² dalam High Impact conduit dia. 20 mm
lantai 1
1 Instalasi penerangan 161.00 titik
2 Downlight LED Inbow 6 W 4.00 bh
3 Downlight LED Inbow 10 W 45.00 bh
4 Downlight LED Inbow 10 W + Nicad Batery 2.00 bh
5 Downlight LED Inbow 13 W 97.00 bh
6 Downlight LED Inbow 13 W+ Nicad Batery 8.00 bh
7 Lampu Led Baret Circular 10 W 5.00 bh
8 Sakelar Ganda 34.00 bh
9 Sakelar Tunggal 27.00 bh
10 Lampu Exit + baterai 2.00 bh
Kabel NYM 3x2.5 mm² dalam High Impact conduit dia. 20 mm
11 Instalasi kotak kontak 1p 78.00 titik
12 Outlet kotak kontak dinding 1p 77.00 bh
13 Outlet kotak kontak dinding 1p 3 lubang 1.00 bh
Lantai 2
14 Instalasi penerangan 213.00 titik
15 Downlight LED Inbow 6 W 10.00 bh
16 Downlight LED Inbow 10 W 53.00 bh
17 Downlight LED Inbow 10 W + Nicad Batery 5.00 bh
18 Downlight LED Inbow 13 W 55.00 bh
19 Downlight LED Inbow 13 W+ Nicad Batery 6.00 bh
20 Lampu Led Baret Circular 10 W 2.00 bh
21 Lampu Kamar Operasi TL LED (Recess Mounted) 45 Watt Inbow 76.00 bh
22 Lampu indikator ruang ok 6.00 bh
23 Sakelar Ganda 34.00 bh
24 Sakelar Tunggal 13.00 bh
25 Lampu Exit + baterai 2.00 bh
Kabel NYM 3x2.5 mm² dalam High Impact conduit dia. 20 mm
26 Instalasi kotak kontak 1p 86.00 titik
27 Instalasi Listrik Pass Box 8.00 titik
28 Instalasi Listrik Door full Hermatik 3.00 titik
29 Instalasi Listrik operating timer 3.00 titik
30 Outlet kotak kontak dinding 1p 25.00 bh
31 Stop kontak Ruang operasi 20 ampere 36.00 bh
32 Outlet kotak kontak dinding 1p 3 lubang 15.00 bh
33 Outlet kotak kontak lantai 10.00 bh
Lantai Koridor luar

RAB_Gedung OK dan VK 151


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
34 Instalasi penerangan 68.00 titik
35 Lampu Led Baret Circular 10 W 67.00 bh
36 Lampu Led Baret Circular 10 W + Nicad Batery 1.00 bh
37 Sakelar Ganda 5.00 bh
BED HEAD R. Tindakan
38 Bed Head Finishing aluminium c/w 1 sakelar tunggal, lampu TL LED 2 x 10 Watt, 5 Outlet 11.00 unit
39 Instalasi kotak kontak Bed Head (1 kabel Power untuk 3 kotak kontak) 11.00 titik
40 Instalasi Power lampu Bed Head 11.00 titik
Pekerjaan Grounding Listrik
41 BC 50 mm 52.00 meter
42 Sumuran grounding arus kuat tahanan maksimal 2 ohm 2.00 unit
43 Sumuran grounding Lift arus kuat tahanan maksimal 1 ohm 1.00 unit
Pekerjaan Grounding medis
44 BC 25 mm Dari P.P Ok ke pentanahan 85.00 meter
45 BC 50 mm 36.00 meter
46 Sumuran grounding trafo isolasi tahanan maksimal 0,2 ohm 1.00 unit
47 Sumuran grounding perangkat medis Cath Lab tahanan maksimal 0,5 ohm 1.00 unit
Panel dan Kabel Feeder
Panel

RAB_Gedung OK dan VK 152


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
48 SUB DISTRIBUSI PANEL OK & VK (Wall mounted)
Box Panel Ukuran 60 x 80 x 20 cm 1.00 bh
MCCB 320A, 36kA, 3P 1.00 bh
MCCB 250A, 18kA, 3P 1.00 bh
MCCB 60A, 7,5kA, 3P 2.00 bh
MCCB 50A, 7,5kA, 3P 2.00 bh
MCCB 40A, 7,5kA, 3P 1.00 bh
MCB 10A, 3P, 10 kA 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Surge Arester tipe 1 3P+N 1.00 bh
Skun kabel + Material bantu 1.00 lot
49 SUB DISTRIBUSI PANEL UPS OK (Wall mounted)
Box Panel Ukuran 60 x 80 x 20 cm 1.00 bh
MCCB 320A, 36kA, 3P 1.00 bh
MCCB 125A, 18kA, 3P 1.00 bh
MCB 10A, 3P, 10 kA 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Surge Arester tipe 1 3P+N 1.00 bh
Skun kabel + Material bantu 1.00 lot
50 POWER PANEL UPS OK (Wall mounted)
Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 125A, 18kA, 3P 1.00 bh
MCB 25A, 6kA, 3P 1.00 bh
MCB 40A, 4,5kA, 1P 5.00 bh
MCB 16A, 4,5kA, 1P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot

RAB_Gedung OK dan VK 153


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
51 POWER PANEL OK 2 (Wall mounted) 1.00 Lot
MCB 40A, 4,5kA, 2P 2.00 bh
MCB 16A, 4,5kA, 2P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
Isolation Transformer 5KVA 1.00 lot
52 POWER PANEL OK 3 (Wall mounted) 1.00 Lot
MCB 40A, 4,5kA, 2P 2.00 bh
MCB 16A, 4,5kA, 2P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 1.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
Isolation Transformer 5KVA 1.00 lot

RAB_Gedung OK dan VK 154


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
53 POWER PANEL OK 4 (Wall mounted) 1.00 Lot
MCB 40A, 4,5kA, 2P 2.00 bh
MCB 16A, 4,5kA, 2P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 1.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
Isolation Transformer 5KVA 1.00 lot
54 POWER PANEL OK 5 (Wall mounted) 1.00 Lot
MCB 40A, 4,5kA, 2P 2.00 bh
MCB 16A, 4,5kA, 2P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 1.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
Isolation Transformer 5KVA 1.00 lot
55 POWER PANEL OK 6 (Wall mounted) 1.00 Lot
MCB 40A, 4,5kA, 2P 2.00 bh
MCB 16A, 4,5kA, 2P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 1.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
Isolation Transformer 5KVA 1.00 lot

56 POWER PANEL LANTAI 1 (Wall mounted)


Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 60A, 7,5kA, 3P 1.00 bh
MCCB 20A, 6kA, 3P 2.00 bh
MCCB 10A, 6kA, 3P 4.00 bh
MCB 16A, 4,5kA, 1P 10.00 bh
MCB 4A, 4,5kA, 1P 12.00 bh

RAB_Gedung OK dan VK 155


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
57 POWER PANEL LANTAI 2 (Wall mounted)
Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 40A, 7,5kA, 3P 1.00 bh
MCCB 20A, 4,5kA, 1P 2.00 bh
MCB 16A, 4,5kA, 1P 9.00 bh
MCB 4A, 4,5kA, 1P 15.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot

RAB_Gedung OK dan VK 156


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
58 POWER PANEL AC 1 (Wall mounted)
Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 60A, 7,5kA, 3P 1.00 bh
MCCB 10A, 4,5kA, 1P 11.00 bh
MCB 16A, 4,5kA, 1P 7.00 bh
MCB 6A, 4,5kA, 1P 7.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
59 POWER PANEL AC 2 (Wall mounted)
Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 40A, 7,5kA, 3P 1.00 bh
MCCB 10A, 4,5kA, 1P 3.00 bh
MCB 16A, 4,5kA, 1P 11.00 bh
MCB 6A, 4,5kA, 1P 4.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
60 POWER PANEL AC OK (OUTDOOR TYPE)
Box Panel Ukuran 60 x 1200 x 25 cm 1.00 bh
MCCB 250A, 18kA, 3P 1.00 bh
MCCB 60A, 10kA, 3P 6.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
phase failure 1.00 bh
Skun kabel + Material bantu 1.00 lot
61 Panel kontrol pompa air bersih transfer 1.00 bh
62 Panel kontrol pompa Booster 1.00 bh
Kabel Feeder
63 Kabel NYFGBY 4x185 mm² (SDP IPSRS - SDP OK & VK) 138.00 m'
64 Kabel NYFGBY 4x185 mm² (SDP IPSRS - SDP UPS OK) 158.00 m'
65 Kabel NYY 4x95 mm² (SDP OK - UPS 120 KVA Cath lab) 17.00 m'

RAB_Gedung OK dan VK 157


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
66 Kabel NYY 4x95 mm² (UPS 120 KVA Cath Lab -Panel Main swicth- Mesin Cath Lab)
67 Kabel NYY 4x50 mm² (SDP OK - PP UPS OK) 13.00 m'
68 Kabel NYY 4x50 mm² (PP UPS OK - UPS OK 60 KVA) 18.00 m'
69 Kabel NYY 3x10 mm² (PP UPS OK - PP OK 2) 37.00 m'
70 Kabel NYY 3x10 mm² (PP UPS OK - PP OK 3) 38.00 m'
71 Kabel NYY 3x10 mm² (PP UPS OK - PP OK 4) 55.00 m'
72 Kabel NYY 3x10 mm² (PP UPS OK - PP OK 5) 56.00 m'
73 Kabel NYY 3x10 mm² (PP UPS OK - PP OK 6) 66.00 m'
74 Kabel NYY 4x16 mm² (SDP OK & VK - PP LANTAI 1) 12.00 m'
75 Kabel NYY 4x10 mm² (SDP OK & VK - PP LANTAI 2) 20.00 m'
76 Kabel NYY 4x16 mm² (SDP OK & VK - PP AC 1) 14.00 m'
77 Kabel NYY 4x10 mm² (SDP OK & VK - PP AC 2) 22.00 m'
78 Kabel NYY 4(1cx70) mm² (SDP OK & VK - PP AC OK) 35.00 m'
79 Kabel NYY 4x10 mm² (SDP OK & VK - PP Lift) 25.00 m'
80 Kabel NYY 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 1 70.00 m'
81 Kabel NYY 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 2 80.00 m'
82 Kabel NYY 4x4 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m'
83 Kabel NYY 3x4 mm² (PP LANTAI 2 - POMPA BOOSTER) 35.00 m'
Grounding Arus kuat
84 Kabel BC 120 mm² (Grounding Pentanahan 1 - SDP OK & VK) 20.00 m'
85 Kabel BC 120 mm² (Grounding Pentanahan 2 - SDP UPS OK ) 42.00 m'
86 Kabel BC 25 mm² (SDP UPS OK - UPS OK - PP UPS OK ) 24.00 m'
87 Kabel BC 50 mm² (Grounding Pentanahan 3 - UPS Cath lab 120 KVA) 40.00 m'
88 Kabel BC 6 mm² (Trafo isolasi - Grounding pentanahan 4 ) 70.00 m'
89 Kabel BC 6 mm² (PP Lift - Grounding pentanahan 5 ) 43.00 m'
90 Kabel BC 10 mm² (SDP OK & VK - PP Lantai 1) 12.00 m'

RAB_Gedung OK dan VK 158


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
91 Kabel BC 6 mm² (SDP OK & VK - PP Lantai 2) 20.00 m'
92 Kabel BC 10 mm² (SDP OK & VK - PP AC 1) 14.00 m'
93 Kabel BC 6 mm² (SDP OK & VK - PP AC 2) 22.00 m'
94 Kabel BC 50 mm² (SDP OK & VK - PP AC OK) 35.00 m'
95 Kabel BC 6 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m'
96 Kabel BC 4 mm² (PP Lantai 1 - DUMB WAITER 1 70.00 m'
97 Kabel BC 4 mm² (PP Lantai 1 - DUMB WAITER 2 80.00 m'

Pekerjaan Kabel Ladder dan Tray


Arus kuat
Lantai 1
98 Kabel Tray/cage uk lebar 400 mm x 3000 mm H 100 12.00 m'
99 Kabel Tray/cage uk lebar 300 mm x 3000 mm H 50 46.00 m'
100 Kabel Tray/cage uk lebar 200 mm x 3000 mm H 50 + Cover 12.00 m'
101 Tee Ukuran 30 cm 1.00 bh
102 Elbow Ukuran 30 cm 1.00 bh
103 In Out Rider Ukuran 30 cm 1.00 bh
104 In Out Rider Ukuran 20 cm 3.00 bh
105 Reducer 2.00 bh
106 Supporting(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls
Lantai 2
107 Kabel Tray/cage uk lebar 400 mm x 3000 mm H 100 22.00 m'
108 Kabel Tray/cage uk lebar 300 mm x 3000 mm H 50 30.00 m'
109 Kabel Tray/cage uk lebar 200 mm x 3000 mm H 50 + cover 28.00 m'
110 Tee Ukuran 30 cm 3.00 bh
111 Elbow Ukuran 30 cm 1.00 bh
112 In Out Rider Ukuran 20 cm 5.00 bh
113 Elbow Ukuran 20 cm 4.00 bh
114 Reducer 6.00 bh
115 Supporting(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls
Arus Lemah
Lantai 1
116 Kabel Tray/cage uk lebar 200 mm x 3000 mm H 50 68.00 m'
117 Elbow Ukuran 20 cm 1.00 bh
118 Tee Ukuran 20 cm 2.00 bh
119 In Out Rider Ukuran 20 cm 3.00 bh
120 Supporting(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls
Lantai 2
120 Kabel Tray/cage uk lebar 200 mm x 3000 mm H 50 53.00 m'
121 Elbow Ukuran 20 cm 1.00 bh
122 In Out Rider Ukuran 20 cm 3.00 bh

RAB_Gedung OK dan VK 159


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
123 Tee Ukuran 20 cm 1.00 bh
124 Supporting(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls
Sumber listrik Cadangan
125 UPS Ruang Operasi OK 60 Kva 3 Phase, 3 Phase in 1 Phase out 1.00 ls
126 UPS Ruang Operasi Cath Lab 120 Kva , 3 Phase in 3 Phase out (cath Lab) 1.00 ls
Sub Jumlah Instalasi Penerangan & kotak kontak
02 Instalasi Tata Udara / AC Lantai 1 & 2
Instalasi AC lengkap dengan Bracket, Pipa referigerant & Drain, pengkabelan & supporting
Lantai 1
1 Instalasi Power AC 1 Fasa (NYM 3x2.5 mm²) 18.00 titik
2 Instalasi Power AC 3 Fasa (NYM 4x2.5 mm²+NYA 2.5 mm² ) 2.00 titik
3 Air Conditioning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 3.00 unit
4 Air Conditioning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 4.00 unit
5 Air Conditioning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 4.00 unit
6 Air Conditioning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 1.00 unit
7 Air Conditioning split Kap. 18000 BTUH / 2 pk tipe Ceiling Casette 6.00 unit
8 Air Conditioning split Kap. 27000 BTUH / 3 pk tipe Ceiling Casette 2.00 unit
9 Outlet Stop kontak AC 1 phase 12.00 bh
10 Pipa referigerant 1/4″ + 3/8″ + Isolasi 132.00 m'
11 Pipa referigerant 1/4″ + 1/2″ + Isolasi 84.00 m'
12 Pipa referigerant 3/8″ + 5/8″ + Isolasi 30.00 m'
13 Pipa Drain PVC AW 1 1/4" + Isolasi 58.00 m'
14 Pipa Drain PVC AW 1'' + Isolasi 45.00 m'
15 Pipa Drain PVC AW 3/4'' + Isolasi 80.00 m'

RAB_Gedung OK dan VK 160


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
Lantai 2
16 Instalasi Power AC 1 Fasa (NYM 3x2.5 mm²) 19.00 titik
17 Air Conditioning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 2.00 unit
18 Air Conditioning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 3.00 unit
19 Air Conditioning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 2.00 unit
21 Air Conditioning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 6.00 unit
22 Air Conditioning split Kap. 18000 BTUH / 2 pk tipe Ceiling Casette 6.00 unit
23 Outlet Stop kontak AC 1 phase 13.00 bh
24 Pipa referigerant 1/4″ + 3/8″ + Isolasi 105.00 m'
25 Pipa referigerant 1/4″ + 1/2″ + Isolasi 180.00 m'
26 Pipa Drain PVC AW 1 1/4" + Isolasi 60.00 m'
27 Pipa Drain PVC AW 1'' + Isolasi 50.00 m'
28 Pipa Drain PVC AW 3/4'' + Isolasi 76.00 m'
INSTALASI FAN LANTAI 1 & 2
29 Instalasi Power Fan 1 Fasa (NYM 3x2.5 mm²) 22.00 titik
30 Alumunium flexible ducting 8 inch 15.00 m'
31 Ceiling Exhausth Fan tipe sirocco 50 cfm 18.00 unit
32 Ceiling Exhausth Fan tipe sirocco 100 cfm 2.00 unit
33 Pipa PVC kelas D dia. 100 mm atau 4" 126.00 m'
34 Alumunium flexible ducting 4 inch 36.00 m'
35 Grill Exchaust fan Toilet ukuran 20 x 20 cm 8.00 bh
36 Industrial Wall Exchaust FAN 10" kap. 300 CFM 0.4 in wg low noise c/w asesories 2.00 unit
Sub Jumlah Instalasi Tata Udara / AC Lantai 1 & 2
Split duct Ruang Operasi (OK)
37 AC ruang Operasi 2 Lengkap Dengan aksessoris PMK NO 24 Tahun 2016
temperatur : 19 - 23 ˚C
Relative Humidity : 45 - 60 %
Air Change Ruang : 4 S/d 20 x jam
Indeks kebisingan : 45 dBA
tekanan udara : positif
lengkap dengan:
A Peralatan utama :
1. Unit AC type Split duct air cooled 1.00 unit
Type : Split Duct
Capacity : 100.000 Btu/h
Power suplay 11,4 Kw/380 V/ 3p
2. Boster Fan/Flug type c/w speed control 3200 cfm 1.00 unit
3. Exchaust Fan tipe axial 506 cfm 1.00 unit

B Pemipaan,Ducting,Asesories ducting,Filter,ekerjaan Electrical 1.00 Lot


a Pemipaan :

RAB_Gedung OK dan VK 161


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Pipa Refrigerant Cooper Astm B280 c/w isolasi & fittings
- Pipa Drain c/w isolasi
b Ducting :
Supply air duct bahan Polyurethane c/w supporting 1.00 lot
- ukuran 35 x 30 cm
- ukuran 50x 35 cm
- ukuran 850 x35 cm
Return air duct bahan Polyurethane c/w supporting 1.00 lot
- ukuran 35 x 30 cm
- ukuran 45 x 35 cm
- ukuran 75 x 35 cm
Fresh air duct bahan Polyurethane c/w supporting 1.00 lot
- Ducting Low Return
- Plenum box
- ukuran 30 x 25 cm
- Louvre Grill ukuran 30 x 25 cm
c Asesories ducting :
RAG 50 x 35 4.00 bh
Volume Damper Return 4.00 bh
Volume Damper Freash air 1.00 bh
Elictric Heater 6300 watt 1.00 bh

RAB_Gedung OK dan VK 162


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
d Filter :
- Pre FILTER 2.00 unit
Type : G4 Washable
Material : Polyester Filter
Effciency : 90~95% Based On 10 µm
- Medium FILTER 2.00 unit
Type : F8
Effciency : 90~95% Based On 1 µm
- HEPA FILTER Type 4.00 unit
Type : H-14
Effciency : 99,99% Based On 0,3 µm
e Housing Filter
Housing Filter Pre + medium + isolasi 1.00 unit
Housing Filter Hepa(celling) 4.00 unit
f Pekerjaan Electrical Lengkap dengan 1.00 Lot
Panel Kontrol AC
Kabel Power (unit ac,outdoor ac, & Booster fan)NYY
Kabel Kontrol NYA
Pressure differensial indikator filter udara

38 AC ruang Operasi 3 Lengkap Dengan aksessoris PMK NO 24 Tahun 2016


temperatur : 19 - 23 ˚C
Relative Humidity : 45 - 60 %
Air Change Ruang : 4 S/d 20 x jam
Indeks kebisingan : 45 dBA
tekanan udara : positif
lengkap dengan:
A Peralatan utama :
1. Unit AC type Split duct air cooled 1.00 unit
Type : Split Duct
Capacity : 100.000 Btu/h
Power suplay 11,4 Kw/380 V/ 3p
2. Boster Fan/Flug type c/w speed control 3200 cfm 1.00 unit
3. Exchaust Fan tipe axial 506 cfm 1.00 unit

B Pemipaan,Ducting,Asesories ducting,Filter,ekerjaan Electrical 1.00 Lot


a Pemipaan :
- Pipa Refrigerant Cooper Astm B280 c/w isolasi & fittings
- Pipa Drain c/w isolasi
b Ducting :
Supply air duct bahan Polyurethane c/w supporting 1.00 lot

RAB_Gedung OK dan VK 163


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- ukuran 35 x 30 cm
- ukuran 50x 35 cm
- ukuran 850 x35 cm
Return air duct bahan Polyurethane c/w supporting 1.00 lot
- ukuran 35 x 30 cm
- ukuran 45 x 35 cm
- ukuran 75 x 35 cm
Fresh air duct bahan Polyurethane c/w supporting 1.00 lot
- Ducting Low Return
- Plenum box
- ukuran 30 x 25 cm
- Louvre Grill ukuran 30 x 25 cm
c Asesories ducting :
RAG 50 x 35 4.00 bh
Volume Damper Return 4.00 bh
Volume Damper Freash air 1.00 bh
Elictric Heater 6300 watt 1.00 bh

RAB_Gedung OK dan VK 164


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
d Filter :
- Pre FILTER 2.00 unit
Type : G4 Washable
Material : Polyester Filter
Effciency : 90~95% Based On 10 µm
- Medium FILTER 2.00 unit
Type : F8
Effciency : 90~95% Based On 1 µm
- HEPA FILTER Type 4.00 unit
Type : H-14
Effciency : 99,99% Based On 0,3 µm
e Housing Filter
Housing Filter Pre + medium + isolasi 1.00 unit
Housing Filter Hepa(celling) 4.00 unit
f Pekerjaan Electrical Lengkap dengan 1.00 Lot
Panel Kontrol AC
Kabel Power (unit ac,outdoor ac, & Booster fan)NYY
Kabel Kontrol NYA
Pressure differensial indikator filter udara

39 AC ruang Operasi 6 Lengkap Dengan aksessoris PMK NO 24 Tahun 2016


temperatur : 19 - 23 ˚C
Relative Humidity : 45 - 60 %
Air Change Ruang : 4 S/d 20 x jam
Indeks kebisingan : 45 dBA
tekanan udara : positif
lengkap dengan:
A Peralatan utama :
1. Unit AC type Split duct air cooled 1.00 unit
Type : Split Duct
Capacity : 100.000 Btu/h
Power suplay 11,4 Kw/380 V/ 3p
2. Boster Fan/Flug type c/w speed control 3000 cfm 1.00 unit
3. Exchaust Fan tipe axial 506 cfm 1.00 unit

B Pemipaan,Ducting,Asesories ducting,Filter,ekerjaan Electrical 1.00 Lot


a Pemipaan :
- Pipa Refrigerant Cooper Astm B280 c/w isolasi & fittings
- Pipa Drain c/w isolasi
b Ducting :
Supply air duct bahan Polyurethane c/w supporting 1.00 lot

RAB_Gedung OK dan VK 165


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- ukuran 35 x 30 cm
- ukuran 50x 35 cm
- ukuran 850 x35 cm
Return air duct bahan Polyurethane c/w supporting 1.00 lot
- ukuran 35 x 30 cm
- ukuran 45 x 35 cm
- ukuran 75 x 35 cm
Fresh air duct bahan Polyurethane c/w supporting 1.00 lot
- Ducting Low Return
- Plenum box
- ukuran 30 x 25 cm
- Louvre Grill ukuran 30 x 25 cm
c Asesories ducting :
RAG 50 x 35 4.00 bh
Volume Damper Return 4.00 bh
Volume Damper Freash air 1.00 bh
Elictric Heater 5400 watt 1.00 bh

RAB_Gedung OK dan VK 166


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
d Filter :
- Pre FILTER 2.00 unit
Type : G4 Washable
Material : Polyester Filter
Effciency : 90~95% Based On 10 µm
- Medium FILTER 2.00 unit
Type : F8
Effciency : 90~95% Based On 1 µm
- HEPA FILTER Type 4.00 unit
Type : H-14
Effciency : 99,99% Based On 0,3 µm
e Housing Filter
Housing Filter Pre + medium + isolasi 1.00 unit
Housing Filter Hepa(celling) 4.00 unit
f Pekerjaan Electrical Lengkap dengan 1.00 Lot
Panel Kontrol AC
Kabel Power (unit ac,outdoor ac, & Booster fan)NYY
Kabel Kontrol NYA
Pressure differensial indikator filter udara
Sub Jumlah Instalasi Tata Udara / AC Khusus Ruang OK
Sub Jumlah Total Instalasi Tata Udara / AC
03 Instalasi Telephone Lantai 1 & Lantai 2
Instalasi Kabel ITC 2x0.6mm² dalam High Impact conduit dia. 20 mm
1 Instalasi Telephone 14.00 titk
2 Hand set Telephone single line 14.00 bh
3 Outlet Telephone dinding 1 Pole 14.00 bh
Peralatan Utama
4 Unit utama PABX kap. 6 co line 32Extention lengkap dengan : 1.00 set
- Main Unit PABX, Power suplai, memory card, Extension card, analog card
- Pemasangan & Pemrograman
5 UPS 1200 VA 1.00 ls
6 Box MDF c/w frame & LSA40 Ext. 1.00 set
7 Kabel ITC 40x2x0.6mm² (MDF - PABX) 10.00 m'
8 Operator Konsul + Pesawat Operator 1.00 set
Sub Jumlah Instalasi Telephone
04 Instalasi Fire Alarm Lantai 1 & Lantai 2
Kabel NYA 2x1x1.5 mm² dalam High Impact conduit dia. 20 mm
1 Instalasi Heat Detector type Rate Of Rise (ROR) 74.00 titik
2 Heat detector ROR 58.00 bh
3 Smoke Detector 16.00 bh
4 End of Line 7.00 unit

RAB_Gedung OK dan VK 167


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
5 Alarm bel 1.00 unit
6 instalasi Alarm bel 1.00 unit
7 Indicating lamp 1.00 unit
8 instalasi Indicating lamp 1.00 unit
9 Manual push button 1.00 unit
10 instalasi Manual push button 1.00 unit
Peralatan Utama
11 Main Control Fire Alarm (MCFA) tipe konvensional 10 Zone lengkap dengan peralatan 1.00 unit
12 Pemrograman MCFA 1.00 unit
13 UPS 1200 VA 1.00 ls
Sub Jumlah Instalasi Fire Alarm
05 Instalasi Tata Suara Lantai 1 & Lantai 2
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
1 Instalasi Ceilling Speaker 26.00 titik
2 Ceilling Speaker 3 W 26.00 bh
3 Volume Control & Instalasi 8.00 bh
4 Colum Speaker 10 W c/w bracket & material bantu 6.00 bh
Peralatan Utama
5 Speaker Selector 10 zone 1.00 unit
6 Mixer Power Amplifier 30 W 1.00 unit
7 Booster Power Amplifier 120 W 2.00 unit
8 Usb Player 1.00 unit
9 Hand Held Microphone 1.00 unit
10 Paging Microphone 1.00 unit
11 UPS 1200 VA 1.00 ls
12 MDF SS/ cabinet Rack 1.00 unit
Sub Jumlah Instalasi Tata Suara

RAB_Gedung OK dan VK 168


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
06 Instalasi Kabel Wifi Lantai 1 & Lantai 2
Wifi hotspot
1 Kabel UTP Cat 6 dalam High Impact conduit dia. 20 mm
2 Instalasi Kabel Data Wifi 4.00 titik
3 Wifi Access Point 802,11n - 2,4GHz/5GHz R11 Meter 4.00 bh
4 Instalasi Kotak Kontak untuk Wifi (NYM 3x2,5mm2) 4.00 titik
5 Kotak Kontak Outbow 4.00 bh
6 Managed Switch Hub untuk UTP cat 6. kap 24 Port 1.00 bh
7 Instalasi power Switch Hub & Kotak Kontak. 1.00 bh
8 Instalasi Switch/ Hub ke Hub Consentrator Ke eksisting 1.00 titik
Sub Jumlah Instalasi Kabel Wifi
07 Instalasi CCTV Lantai 1 & Lantai 2
Kabel COAXIAL. RG 59 18AWG BC 95% dengan kabel power dalam High Impact conduit dia. 20 mm
1 Instalasi Kamera CCTV 15.00 titik
2 High Resolution Dome Camera high resolution lengkap dengan Power adaptor & asesorie 14.00 bh
3 High Resolution In door Box CCD Camera day and night lengkap dengan Power adaptor d 1.00 bh
Peralatan utama / Sentral CCTV
sentral CCTV lengkap dengan peralatan, pemasangan, pengkabelan & asesories
4 DVR Card Kap. 8 Channel C/W Hard Disks 2 terrabyte 2.00 unit
5 TV Monitor 32 inch 2.00 unit
6 UPS 2000 VA 2.00 ls
7 Meja CCTV 2.00 ls
Sub Jumlah Instalasi CCTV
08 Air Bekas, Kotor dan Vent Lantai 1 & Lantai 2
Pipa PVC AW komplit dgn galian, bobokan, Pengecatan, fitting & penggantung
1 Pipa PVC kelas AW dia. 150 mm atau 6" 74.00 m'
2 Pipa PVC kelas AW dia. 100 mm atau 4" 468.00 m'
3 Pipa PVC kelas AW dia. 80 mm atau 3" 88.00 m'
4 Pipa PVC kelas AW dia. 50 mm atau 2" 124.00 m'
5 Pipa PVC kelas AW dia.32 mm atau 1 1/4" 58.00 m'
6 Portable Grease trap pelat stainless ukuran (Pxlxt) 50x30x45 cm 3.00 unit
7 Bak Penampung infeksius kap. 3 m3 1.00 unit
- Galian
- struktur beton & Tutup beton
- Peralatan penetral logam
- finishing
8 Bak Penampung(Sumpit) kap. 2 m3 2.00 unit
- Galian
- struktur beton & Tutup beton
- Peralatan penetral logam
- finishing

RAB_Gedung OK dan VK 169


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
9 Pompa Celup Sewage Kapasitas 100 L/m lengkap dengan instalasi power + aksesoris p 2.00 unit
10 Septictank Bio Limbah rumah sakit Kapasitas 3.000 Liter Lengkap dengan 2.00 unit
Galian & seling pengikat
Cairan pengurai dan tablet disinfeksikan
Penutup Septictank Bio (dinding Bata) + Tutup Plat besi 1,2 mm 2.00 unit
11 Manhole bak 30X30 Clean out 4 inci(area lantai 1) 15.00 Lot
Tutup manhole dak bak bata/plesteran
Clean out
elbow
12 Clean out (area lantai 2) 10.00 bh
13 Fitting + Supporting(Gantungan Pipa Besi Siku 50mm, Dynabolt, Mur & baut ) 1.00 lot
Site Plan
14 pengadaan & pemasangan sistem IPAL
Sub Jumlah Instalasi Air Bekas, Kotor dan Vent
09 Air Bersih Lantai 1 & Lantai 2
Pipa PPR PN 10 lengkap dengan fitting, bobokan & Penggantung
1 Pipa PPR PN 10 dia. 50 atau 1 1/2 " 110.00 m'
2 Pipa PPR PN 10 dia. 40 atau 1 1/4 " 122.00 m'
3 Pipa PPR PN 10 dia. 32 atau 1 " 128.00 m'
4 Pipa PPR PN 10 dia. 25 atau 3/4" 36.00 m'
5 Pipa PPR PN 10 dia. 20 atau 1/2" 442.00 m'
6 Gate Valve dia. 50 atau 1 1/2 " 2.00 bh
7 Gate Valve dia. 40 atau 1 1/4 " 1.00 bh
8 Gate Valve dia. 32 atau 1 " 4.00 bh
9 Fitting + Supporting(Gantungan Pipa Besi Siku 30mm, Dynabolt, Mur & baut ) 1.00 lot

RAB_Gedung OK dan VK 170


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
POMPA TRANSFER AIR BERSIH
10 Paket Pompa Transfer air bersih kap. 8m3/jam Total head 40 meter 2 kw (1 Pompa) (leng 1.00 set
Gate valve 1 1/2''
Check valve 1 1/2''
Foot Valve 1 1/2''
Pressure Gauge
Panel kontrol pompa air bersih transfer
11 Bangunan/Struktur reservoir Ground Water Tank (GWT) kap. 2x50 m3 & rumah pompa 1.00 ls
AIR BERSIH di Atap
12 Header 3'' 1.00 set
13 Gate Valve 1 1/2 '' 7.00 bh
14 Rooftank Fiber kap. 2000 liter ukuran : dia. 1.45 tinggi 1.5 meter lengkap dengan peralatan 2.00 unit
15 Water Level Control 2.00 unit
16 Paket Pompa Booster air bersih kap. 5m3/jam Total head 45 meter 0,816Kw lengkap deng 1.00 unit
Sub Jumlah Instalasi Air Bersih
10 Air Panas
Pipa PPR PN 20 lengkap dengan fitting, bobokan & Penggantung
1 Pipa PPR PN 20 dia. 15 mm atau 1/2" 16.00 m'
2 Gate Valve 1/2'' 4.00 bh
3 Instalasi Power Water Heater c/w Kotak kontak 4.00 bh
4 Water Heater listrik kap. 15 liter c/w asesories 4.00 bh
5 Fitting + Supporting(Gantungan Pipa Besi Siku 30mm, Dynabolt, Mur & baut ) 1.00 lot
Sub Jumlah Instalasi Air Panas
11 Penanggulangan Kebakaran Lantai 1 & Lantai 2
1 Fire Extinguisher kap. 3 Kg Klass ABC tipe CO2 6.00 unit
Sub Jumlah Instalasi Penanggulangan Kebakaran
12 Saluran air hujan
1 Pipa PVC kelas AW dia. 100 mm atau 4" 612.00 m'
2 Pipa PVC kelas AW dia. 150 mm atau 6" 160.00 m'
3 Manhole bak 30X30 Clean out 4 inci(area lantai 1) 4.00 Lot
Tutup manhole dak bak bata/plesteran
Clean out 4 inci
4 Roof Drain dia. 100 mm atau 4" 51.00 bh
5 Fitting + Supporting 1.00 lot
6 Saluran drainase tipe terbuka lengkap dengan : m'
7 Bak Kontrol 50X50 bh
Sub Jumlah Instalasi Saluran Air Hujan
13 Instalasi Gas Medis Lantai 1 & Lantai 2
Out let gas medis lengkap dengan acessories, Pipa tembaga+penahan pipa
1 Outlet gas medis Oksigen 35.00 bh
2 Pipa Cooper 8 mm² O2 ~ 3/8" OD 70.00 m'

RAB_Gedung OK dan VK 171


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
3 Pipa Cooper 12 mm² O2 ~ 1/2" OD 70.00 m'
4 Pipa Cooper 15 mm² O2 ~ 5/8" OD 58.00 m'
5 Pipa Cooper 20 mm² O2 ~ 3/4" OD 55.00 m'
6 Pipa Cooper 25 mm² O2 ~ 1" OD 65.00 m'
7 Outlet gas medis Vacuum 29.00 bh
8 Pipa Cooper 8 mm² Vacuum ~ 3/8" OD 58.00 m'
9 Pipa Cooper 12 mm² Vacuum ~ 1/2" OD 72.50 m'
10 Pipa Cooper 15 mm² VAcuum ~ 5/8" OD 55.00 m'
11 Pipa Cooper 20 mm² Vacuum ~ 3/4" OD 115.00 m'
12 Outlet gas medis Compressed Air 4 bar 18.00 bh
13 Pipa Cooper 8 mm² Compessed Air 4 bar ~ 3/8" OD 36.00 m'
14 Pipa Cooper 12 mm² Compessed Air 4 bar ~ 1/2" OD 45.00 m'
15 Pipa Cooper 15 mm² Compessed Air 4 bar ~ 5/8" OD 35.00 m'
16 Pipa Cooper 20 mm² Compessed Air 4 bar 3/4" OD 118.00 m'
17 Outlet gas medis Nitrous Oksida 12.00 bh
18 Pipa Cooper 8 mm² Nitrous Oksida ~ 3/8" OD 24.00 m'
19 Pipa Cooper 12 mm² Nitrous Oksida ~ 1/2" OD 30.00 m'
20 Pipa Cooper 15 mm² Nitrous Oksida ~ 5/8" OD 35.00 m'
21 Pipa Cooper 20 mm² Nitrous Oksida ~ 3/4" OD 118.00 m'
22 Outlet gas medis karbon dioksida 12.00 bh
23 Pipa Cooper 8 mm² karbon dioksida ~ 3/8" OD 24.00 m'
24 Pipa Cooper 12 mm² karbon dioksida ~ 1/2" OD 30.00 m'
25 Pipa Cooper 15 mm² karbon dioksida ~ 5/8" OD 34.00 m'
26 Pipa Cooper 20 mm² karbon dioksida ~ 3/4" OD 118.00 m'
27 Zone Box Valve 5 Line 1.00 unit

RAB_Gedung OK dan VK 172


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
28 Manual Area Alarm 5 gas 1.00 unit
29 fitting Supporting 1.00 ls
Kawasan
30 Bangunan/Struktur Sentral Gas Medis 1.00 ls
31 Sentral karbon dioksida 1.00 ls
32 Sentral Nitrous Oksida 1.00 ls
33 Sentral oksigen 1.00 ls
34 Sentral Vacuum 1.00 ls
35 Sentral Compressed air 1.00 ls
Sub Jumlah Instalasi Gas Medis
14 Penyalur Petir
1 Head terminal Radius 80 meter 1.00 unit
2 Down conductor NYY 1X70 mm² 49.00 m
3 BC 50 mm² ring grounding 35.00 m
4 Sumuran grounding tahanan max 2 ohm 1.00 set
5 Tiang penyangga penangkal petir 9 meter 1.00 unit
Sub Jumlah Instalasi Penyalur Petir
15 BED ELEVATOR
1 Bed elevator kap 1000 kg (2 lantai/2 stop) Lengkap Dengan 1.00 unit
Elevator type bed(bed elevator)
Automatic 2 panel centre opening
finis wall stainless Hairlined
2 Dumbwaiter Kapasitas 100 Kg 2 lantai Termasuk Biaya ongkos kirim & jasa 2.00 unit
Ukuran Box 700(w) x 700(D) x 800(H)
3 Pekerjaan sipil Untuk Lift (beam,wp,baja & asseories) 1.00 lot
4 Pekerjaan sipil Untuk Dumb waiter (beam,wp,baja & asseories) 2.00 lot
Sub Jumlah Instalasi Bed Elevator
JUMLAH TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL

RAB_Gedung OK dan VK 173


RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

: PEMBANGUNAN GEDUNG OPERASI (OK) DAN BERSALIN (VK)


NSI : RUMAH SAKIT UMUM DAERAH DR. AGOESDJAM
: JL. MAYJEND D.I. PANJAITAN NO. 51 KABUPATEN KETAPANG
ARAN : 2018

KODE HARGA SATUAN


URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
AAN STRUKTUR GEDUNG
AAN PENDAHULUAN
an Bowplank 2.2.1.4.a 170.20 M' 65,488.50
aran 1.00 Lsm 15,000,000.00
mentara 2.2.1.2.a 171.40 M' 304,623.00
ma Proyek 1.00 Lsm 400,000.00
Sub Jumlah I
AAN PONDASI
n Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 702.00 Btg 1,600,000.00

gan Mini Pile 25 x 25 K450 4,212.00 M' 120,000.00


an Mini Pile 234.00 Titik 40,000.00
ah Pondasi 2.3.1.1 128.74 M³ 90,612.50
sir t = 10 cm 2.3.1.11 15.15 M³ 141,845.00
a t = 5 cm 4.1.1.4 7.57 M³ 996,598.84
P1
Ready Mix K-300 B. 13.i.2 1.26 M³ 1,682,037.50
gan U32 4.1.1.17.b 137.28 Kg 18,317.75
ng Pondasi 4.1.1.20.a 8.40 M² 135,487.00
P2
Ready Mix K-300 B. 13.i.2 7.81 M³ 1,682,037.50
gan U32 4.1.1.17.b 666.78 Kg 18,317.75
ng Pondasi 4.1.1.20.a 29.61 M² 135,487.00
P3
Ready Mix K-300 B. 13.i.2 1.57 M³ 1,682,037.50
gan U32 4.1.1.17.b 105.83 Kg 18,317.75
ng Pondasi 4.1.1.20.a 3.99 M² 135,487.00
P4
Ready Mix K-300 B. 13.i.2 1.68 M³ 1,682,037.50
gan U32 4.1.1.17.b 157.45 Kg 18,317.75
ng Pondasi 4.1.1.20.a 4.34 M² 135,487.00

RAB_Gedung OK dan VK 174


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
P6
Ready Mix K-300 B. 13.i.2 9.98 M³ 1,682,037.50
gan U32 4.1.1.17.b 652.08 Kg 18,317.75
ng Pondasi 4.1.1.20.a 21.56 M² 135,487.00
P8
Ready Mix K-300 B. 13.i.2 14.81 M³ 1,682,037.50
gan U32 4.1.1.17.b 892.79 Kg 18,317.75
ng Pondasi 4.1.1.20.a 25.76 M² 135,487.00
P9
Ready Mix K-300 B. 13.i.2 29.62 M³ 1,682,037.50
gan U32 4.1.1.17.b 1,785.57 Kg 18,317.75
ng Pondasi 4.1.1.20.a 51.52 M² 135,487.00
P10
Ready Mix K-300 B. 13.i.2 39.28 M³ 1,682,037.50
gan U32 4.1.1.17.b 2,266.98 Kg 18,317.75
ng Pondasi 4.1.1.20.a 59.92 M² 135,487.00
ndasi K1 Uk. 45x45 cm
Ready Mix K-225 B. 13.f.2 4.25 M³ 1,513,737.50
gan U32 4.1.1.17.b 1,722.01 Kg 18,317.75
gan U24 4.1.1.17.a 167.82 Kg 16,585.25
ng Pondasi 4.1.1.20.a 37.80 M² 135,487.00
ndasi K2 Uk. 30x30 cm
Ready Mix K-225 B. 13.f.2 0.44 M³ 1,513,737.50
gan U32 4.1.1.17.b 189.67 Kg 18,317.75
gan U24 4.1.1.17.a 25.07 Kg 16,585.25
ng Pondasi 4.1.1.20.a 5.88 M² 135,487.00

RAB_Gedung OK dan VK 175


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
ndasi K2 Uk. 20x40 cm (L)
Ready Mix K-225 B. 13.f.2 0.36 M³ 1,513,737.50
gan U32 4.1.1.17.b 79.58 Kg 18,317.75
gan U24 4.1.1.17.a 8.58 Kg 16,585.25
ng Pondasi 4.1.1.20.a 1.92 M² 135,487.00
awah Lift :
asif
Ready Mix K 225 t = 14 cm B. 13.f.2 2.52 M³ 1,513,737.50
esh 2xM7 4.1.1.19 150.29 Kg 13,993.65
ng Balok 4.1.1.23.b 36.04 M² 228,085.00
ran Dinding 4.4.2.4 36.04 M² 71,177.04
proofing Dinding A.4.7.1.10.f 36.04 M² 26,582.05
h Dudukan Lift
Tanah 2.3.1.1 5.41 M³ 90,612.50
n Pasir tebal 10 cm 2.3.1.11 1.80 M³ 141,845.00
Kerja t = 5 cm 4.1.1.4 0.90 M³ 996,598.84
Ready Mix K 225 t = 16 cm B. 13.f.2 2.88 M³ 1,513,737.50
esh 2xM7 4.1.1.19 150.29 Kg 13,993.65
ran Atas Plat 4.4.2.4 18.02 M² 71,177.04
proofing Lantai A.4.7.1.10.f 18.02 M² 26,582.05
Sub Jumlah II
AAN STRUKTUR
antai 1
35x60 cm
Ready Mix K-225 B. 13.f.2 47.24 M³ 1,513,737.50
gan U32 4.1.1.17.b 9,766.80 Kg 18,317.75
gan U24 4.1.1.17.a 1,888.72 Kg 16,585.25
ng Sloof 4.1.1.21.a 364.43 M² 135,487.00
25x50 cm
Ready Mix K-225 B. 13.f.2 20.81 M³ 1,513,737.50
gan U32 4.1.1.17.b 2,695.54 Kg 18,317.75
gan U24 4.1.1.17.a 712.87 Kg 16,585.25
ng Sloof 4.1.1.21.a 218.49 M² 135,487.00
20x45 cm
Ready Mix K-225 B. 13.f.2 0.57 M³ 1,513,737.50
gan U32 4.1.1.17.b 64.15 Kg 18,317.75
gan U24 4.1.1.17.a 23.97 Kg 16,585.25
ng Sloof 4.1.1.21.a 7.31 M² 135,487.00
20x40 cm
Ready Mix K-225 B. 13.f.2 7.34 M³ 1,513,737.50
gan U32 4.1.1.17.b 983.01 Kg 18,317.75

RAB_Gedung OK dan VK 176


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
gan U24 4.1.1.17.a 322.74 Kg 16,585.25
ng Sloof 4.1.1.21.a 97.93 M² 135,487.00
15x40 cm
Ready Mix K-225 B. 13.f.2 0.71 M³ 1,513,737.50
gan U32 4.1.1.17.b 100.11 Kg 18,317.75
gan U24 4.1.1.17.a 37.92 Kg 16,585.25
ng Sloof 4.1.1.21.a 11.89 M² 135,487.00
ng Uk.10x30 cm (blk.35/60)
Ready Mix K-225 B. 13.f.2 2.57 M³ 1,513,737.50
esh M7 4.1.1.19 142.74 Kg 13,993.65
ng Sloof 4.1.1.21.a 51.35 M² 135,487.00
ran Tutup Kolong Uk.10x30 cm (blk.35/60) 4.4.2.4 37.83 M² 71,177.04
ng Uk.10/30 (blk.25/50)
Ready Mix K-225 B. 13.f.2 0.65 M³ 1,513,737.50
esh M7 4.1.1.17.b 34.62 Kg 13,993.65
ng Sloof 4.1.1.17.a 12.92 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.25/50) 4.4.2.4 8.71 M² 71,177.04
ng Uk.10/50 (blk.20/40)
Ready Mix K-225 B. 13.f.2 1.54 M³ 1,513,737.50
esh M7 4.1.1.19 76.87 Kg 13,993.65
ng Sloof 4.1.1.21.a 30.73 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 18.44 M² 71,177.04
Uk. 45x45 cm Lt.1
Ready Mix K-225 B. 13.f.2 20.66 M³ 1,513,737.50
gan U32 4.1.1.17.b 3,612.60 Kg 18,317.75
gan U24 4.1.1.17.a 700.91 Kg 16,585.25
ng Kolom 4.1.1.22 b 183.60 M² 224,636.50

RAB_Gedung OK dan VK 177


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
Uk. 30x30 cm Lt.1
Ready Mix K-225 B. 13.f.2 2.59 M³ 1,513,737.50
gan U32 4.1.1.17.b 454.75 Kg 18,317.75
gan U24 4.1.1.17.a 79.00 Kg 16,585.25
ng Kolom 4.1.1.22 b 34.56 M² 224,636.50
Uk. 20x20 cm Lt.1
Ready Mix K-225 B. 13.f.2 0.14 M³ 1,513,737.50
gan U32 4.1.1.17.b 56.84 Kg 18,317.75
gan U24 4.1.1.17.a 5.93 Kg 16,585.25
ng Kolom 4.1.1.22 b 2.88 M² 224,636.50
Uk. 20x40 cm (L) Lt.1
Ready Mix K-225 B. 13.f.2 0.96 M³ 1,513,737.50
gan U32 4.1.1.17.b 166.74 Kg 18,317.75
gan U24 4.1.1.17.a 61.62 Kg 16,585.25
ng Kolom 4.1.1.22 b 9.60 M² 224,636.50
ktis Uk.9x9 cm Lt.1
K175 4.1.1.4 6.50 M³ 996,598.84
gan U24 4.1.1.17.a 1,620.76 Kg 16,585.25
ng 4.1.1.20.a 144.50 M² 135,487.00
ktis Uk.9x9 cm Lt.1 (dinding)
K175 4.1.1.4 0.47 M³ 996,598.84
gan U24 4.1.1.17.a 115.98 Kg 16,585.25
ng 4.1.1.20.a 10.43 M² 135,487.00
Struktur Lantai 1
antai 2
Dack Uk.15/40 elv. 3.325
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.94 M³ 2,041,737.50
gan U32 4.1.1.17.b 779.08 Kg 18,317.75
gan U24 4.1.1.17.a 274.56 Kg 16,585.25
ng Balok 4.1.1.23.b 86.78 M² 228,085.00
ack elv. 3.360
Ready Mix K-225 menggunakan pompa B. 13.f.1 13.44 M³ 2,041,737.50
esh 2xM7 4.1.1.19 738.92 Kg 13,993.65
ng Lantai 4.1.1.24.b 156.58 M² 253,676.50
ran List Plat Dack elv. 3.360 4.4.2.4 279.93 M² 71,177.04
35x60 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 51.79 M³ 2,041,737.50
gan U32 4.1.1.17.b 10,359.79 Kg 18,317.75
gan U24 4.1.1.17.a 2,070.46 Kg 16,585.25
ng Balok 4.1.1.23.b 399.52 M² 228,085.00
25x50 cm Lt.2

RAB_Gedung OK dan VK 178


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
Ready Mix K-225 menggunakan pompa B. 13.f.1 21.27 M³ 2,041,737.50
gan U32 4.1.1.17.b 2,849.91 Kg 18,317.75
gan U24 4.1.1.17.a 728.52 Kg 16,585.25
ng Balok 4.1.1.23.b 223.29 M² 228,085.00
20x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.95 M³ 2,041,737.50
gan U32 4.1.1.17.b 930.70 Kg 18,317.75
gan U24 4.1.1.17.a 305.30 Kg 16,585.25
ng Balok 4.1.1.23.b 92.63 M² 228,085.00
15x60 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.46 M³ 2,041,737.50
gan U32 4.1.1.17.b 826.13 Kg 18,317.75
gan U24 4.1.1.17.a 295.43 Kg 16,585.25
ng Balok 4.1.1.23.b 99.07 M² 228,085.00
15x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.71 M³ 2,041,737.50
gan U32 4.1.1.17.b 99.81 Kg 18,317.75
gan U24 4.1.1.17.a 37.81 Kg 16,585.25
ng Balok 4.1.1.23.b 11.85 M² 228,085.00
Uk. 45x45 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 34.63 M³ 2,041,737.50
gan U32 4.1.1.17.b 4,896.81 Kg 18,317.75
gan U24 4.1.1.17.a 1,154.96 Kg 16,585.25
ng Kolom 4.1.1.22 b 307.78 M² 224,636.50

RAB_Gedung OK dan VK 179


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
Uk. 30x30 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.48 M³ 2,041,737.50
gan U32 4.1.1.17.b 454.75 Kg 18,317.75
gan U24 4.1.1.17.a 104.91 Kg 16,585.25
ng Kolom 4.1.1.22 b 46.37 M² 224,636.50
Uk. 20x20 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.80 M³ 2,041,737.50
gan U32 4.1.1.17.b 251.63 Kg 18,317.75
gan U24 4.1.1.17.a 32.42 Kg 16,585.25
ng Kolom 4.1.1.22 b 15.94 M² 224,636.50
Uk. 15x15 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.66 M³ 2,041,737.50
gan U32 4.1.1.17.b 677.30 Kg 18,317.75
gan U24 4.1.1.17.a 175.12 Kg 16,585.25
ng Kolom 4.1.1.22 b 48.75 M² 224,636.50
Uk. 20x40 cm (L) Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.70 M³ 2,041,737.50
gan U32 4.1.1.17.b 283.46 Kg 18,317.75
gan U24 4.1.1.17.a 112.79 Kg 16,585.25
ng Kolom 4.1.1.22 b 9.60 M² 224,636.50
ktis Uk.9x9 cm Lt.2
K175 4.1.1.4 8.61 M³ 996,598.84
gan U24 4.1.1.17.a 2,140.52 Kg 16,585.25
ng 4.1.1.20.a 191.27 M² 135,487.00
ktis Uk.9x9 cm Lt.2
K175 4.1.1.4 0.72 M³ 996,598.84
gan U24 4.1.1.17.a 177.76 Kg 16,585.25
ng 4.1.1.20.a 15.98 M² 135,487.00

15x40 cm elv.4.5
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.60 M³ 2,041,737.50
gan U32 4.1.1.17.b 716.23 Kg 18,317.75
gan U24 4.1.1.17.a 260.94 Kg 16,585.25
ng Balok 4.1.1.23.b 82.46 M² 228,085.00
ktis Uk.9x9 cm elv.4.5
K175 4.1.1.4 0.16 M³ 996,598.84
gan U24 4.1.1.17.a 41.61 Kg 16,585.25
ng 4.1.1.20.a 3.60 M² 135,487.00
ack elv. 4.5
Ready Mix K-225 menggunakan pompa B. 13.g.1 7.77 M³ 2,041,737.50
esh 2xM7 4.1.1.19 695.13 Kg 13,993.65

RAB_Gedung OK dan VK 180


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
ng Lantai 4.1.1.24.b 100.36 M² 253,676.50
ran List Plat Dack elv. 4.5 4.4.2.4 139.04 M² 71,177.04

dack Uk.20x40 elv.7.2


Ready Mix K-225 menggunakan pompa B. 13.f.1 0.20 M³ 2,041,737.50
gan U32 4.1.1.17.b 34.50 Kg 18,317.75
gan U24 4.1.1.17.a 9.06 Kg 16,585.25
ng Balok 4.1.1.23.b 2.63 M² 228,085.00
dack Uk.15x40 elv.7.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.21 M³ 2,041,737.50
gan U32 4.1.1.17.b 675.96 Kg 18,317.75
gan U24 4.1.1.17.a 245.80 Kg 16,585.25
ng Balok 4.1.1.23.b 98.38 M² 228,085.00

20x80 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 7.18 M³ 2,041,737.50
gan U32 4.1.1.17.b 1,064.53 Kg 18,317.75
gan U24 4.1.1.17.a 218.23 Kg 16,585.25
ng Balok 4.1.1.23.b 51.32 M² 228,085.00
25x50 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.86 M³ 2,041,737.50
gan U32 4.1.1.17.b 125.69 Kg 18,317.75
gan U24 4.1.1.17.a 29.95 Kg 16,585.25
ng Balok 4.1.1.23.b 9.03 M² 228,085.00

RAB_Gedung OK dan VK 181


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
20x40 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.56 M³ 2,041,737.50
gan U32 4.1.1.17.b 166.28 Kg 18,317.75
gan U24 4.1.1.17.a 51.91 Kg 16,585.25
ng Balok 4.1.1.23.b 19.56 M² 228,085.00
elv. 7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.67 M³ 2,041,737.50
esh 2xM7 4.1.1.19 556.28 Kg 13,993.65
ng Lantai 4.1.1.24.b 50.37 M² 253,676.50
ran Plat Dack elv. 7.60 4.4.2.4 50.37 M² 71,177.04
Plat Dack elv. 7.60 4.4.2.27 50.37 M² 44,682.00
proofing Plat Dack elv. 7.60 A.4.7.1.10.f 50.37 M² 26,582.05

ktis uk.9x9 cm Elv.8.00


K175 4.1.1.4 0.24 M³ 996,598.84
gan U24 4.1.1.17.a 61.25 Kg 16,585.25
ng 4.1.1.20.a 5.34 M² 135,487.00

k uk. 35x60 cm Elv.8.980


Ready Mix K-225 menggunakan pompa B. 13.f.1 26.90 M³ 2,041,737.50
gan U32 4.1.1.17.b 5,303.80 Kg 18,317.75
gan U24 4.1.1.17.a 1,075.82 Kg 16,585.25
ng Balok 4.1.1.23.b 207.50 M² 228,085.00
k uk. 25x55 cm Elv.8.980
Ready Mix K-225 menggunakan pompa B. 13.f.1 15.81 M³ 2,041,737.50
gan U32 4.1.1.17.b 1,920.06 Kg 18,317.75
gan U24 4.1.1.17.a 518.53 Kg 16,585.25
ng Balok 4.1.1.23.b 161.58 M² 228,085.00
k uk. 25x50 cm Elv.8.980
Ready Mix K-K-225 menggunakan pompa B. 13.f.1 13.52 M³ 2,041,737.50
gan U32 4.1.1.17.b 1,752.25 Kg 18,317.75
gan U24 4.1.1.17.a 463.40 Kg 16,585.25
ng Balok 4.1.1.23.b 141.98 M² 228,085.00
k uk. 20x45 cm Elv.8.980
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.95 M³ 2,041,737.50
gan U32 4.1.1.17.b 209.38 Kg 18,317.75
gan U24 4.1.1.17.a 56.92 Kg 16,585.25
ng Balok 4.1.1.23.b 20.48 M² 228,085.00
k uk. 20x40 cm Elv.8.980
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.83 M³ 2,041,737.50
gan U32 4.1.1.17.b 108.67 Kg 18,317.75

RAB_Gedung OK dan VK 182


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
gan U24 4.1.1.17.a 36.64 Kg 16,585.25
ng Balok 4.1.1.23.b 11.01 M² 228,085.00
k uk. 15x40 cm Elv.8.980
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.75 M³ 2,041,737.50
gan U32 4.1.1.17.b 666.02 Kg 18,317.75
gan U24 4.1.1.17.a 250.27 Kg 16,585.25
ng Balok 4.1.1.23.b 79.09 M² 228,085.00
elv. 9.90
Ready Mix K-225 menggunakan pompa B. 13.f.1 62.12 M³ 2,041,737.50
esh 2xM7 4.1.1.19 5,180.81 Kg 13,993.65
ng Lantai 4.1.1.24.b 475.03 M² 253,676.50
ran Plat Dack elv. 9.8 4.4.2.4 950.06 M² 71,177.04
Plat Dack elv. 9.8 4.4.2.27 475.03 M² 44,682.00
proofing Plat Dack elv. 9.8 A.4.7.1.10.f 475.03 M² 26,582.05

20x40 cm Elv.10.50
Ready Mix K-225 menggunakan pompa B. 13.f.1 9.41 M³ 2,041,737.50
gan U32 4.1.1.17.b 988.85 Kg 18,317.75
gan U24 4.1.1.17.a 310.08 Kg 16,585.25
ng Balok 4.1.1.23.b 117.60 M² 228,085.00

20x45 cm Elv.11.480
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.93 M³ 2,041,737.50
gan U32 4.1.1.17.b 372.48 Kg 18,317.75
gan U24 4.1.1.17.a 114.32 Kg 16,585.25
ng Balok 4.1.1.23.b 41.28 M² 228,085.00

RAB_Gedung OK dan VK 183


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
20x40 cm Elv.11.480
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.36 M³ 2,041,737.50
gan U32 4.1.1.17.b 96.24 Kg 18,317.75
gan U24 4.1.1.17.a 12.35 Kg 16,585.25
ng Balok 4.1.1.23.b 4.54 M² 228,085.00
15/40 cm Elv.11.480
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.49 M³ 2,041,737.50
gan U32 4.1.1.17.b 68.84 Kg 18,317.75
gan U24 4.1.1.17.a 26.19 Kg 16,585.25
ng Balok 4.1.1.23.b 8.18 M² 228,085.00
elv. 11.480
Ready Mix K-225 menggunakan pompa B. 13.f.1 5.11 M³ 2,041,737.50
esh 2xM7 4.1.1.19 426.17 Kg 13,993.65
ng Lantai 4.1.1.24.b 38.73 M² 253,676.50
ran Plat Dack elv. 11.480 4.4.2.4 77.46 M² 71,177.04
Plat Dack elv. 11.480 4.4.2.27 38.73 M² 44,682.00
proofing Plat Dack elv. 11.480 A.4.7.1.10.f 38.73 M² 26,582.05
Struktur Lantai 2 2
Sub Jumlah III 3
AAN PLAT LANTAI
1
Ready Mix K-225 t =12 cm B. 13.f.2 110.43 M³ 1,513,737.50
esh 2xM7 4.1.1.19 7,674.80 Kg 13,993.65
ng Lantai 4.1.1.24.c 655.36 M² 228,613.00
2
Ready Mix K-225 t =12 cm menggunakan pompa B. 13.f.1 121.13 M³ 2,041,737.50
esh 2xM7 4.1.1.19 8,418.31 Kg 13,993.65
ng Lantai 4.1.1.24.b 744.41 M² 253,676.50
Sub Jumlah IV
AAN TANGGA
pe T1 (1 Unit)
des uk. 15x40 cm
Ready Mix K-225 B. 13.f.2 0.16 M³ 1,513,737.50
gan U32 4.1.1.17.b 25.26 Kg 18,317.75
gan U24 4.1.1.17.a 9.84 Kg 16,585.25
ng Balok 4.1.1.23.b 3.24 M² 228,085.00
ran Balok Bordes 15/40 4.4.2.4 3.24 M² 71,177.04
s
Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³ 1,513,737.50
gan U24 4.1.1.17.a 86.78 Kg 16,585.25
ng Balok 4.1.1.23.b 3.31 M² 228,085.00

RAB_Gedung OK dan VK 184


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
ran Bawah Plat Bordes 4.4.2.4 3.31 M² 71,177.04
a
Ready Mix K-225 t = 14 cm B. 13.f.2 1.60 M³ 1,513,737.50
gan U24 4.1.1.17.a 306.00 Kg 16,585.25
ng Plat 4.1.1.24.b 22.89 M² 253,676.50
ran Bawah Plat tangga 4.4.2.4 22.89 M² 71,177.04
ga
Ready Mix K-225 B. 13.f.2 0.86 M³ 1,513,737.50
esh M7 4.1.1.19 172.64 Kg 13,993.65
ng 4.1.1.21.a 5.76 M² 135,487.00
pe T2 (1 Unit)
des uk. 15x40 cm
Ready Mix K-225 B. 13.f.2 0.16 M³ 1,513,737.50
gan U32 4.1.1.17.b 25.26 Kg 18,317.75
gan U24 4.1.1.17.a 9.84 Kg 16,585.25
ng Balok 4.1.1.23.b 3.24 M² 228,085.00
ran Balok Bordes 15/40 4.4.2.4 3.24 M² 71,177.04
s
Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³ 1,513,737.50
gan U24 4.1.1.17.a 86.78 Kg 16,585.25
ng Balok 4.1.1.23.b 6.40 M² 228,085.00
ran Bawah Bordes 4.4.2.4 6.40 M² 71,177.04
a
Ready Mix K-225 t = 14 cm B. 13.f.2 2.07 M³ 1,513,737.50
gan U24 4.1.1.17.a 394.96 Kg 16,585.25
ng Plat 4.1.1.24.b 29.60 M² 253,676.50
ran Bawah Plat tangga 4.4.2.4 29.60 M² 71,177.04

RAB_Gedung OK dan VK 185


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
ga
Ready Mix K-225 B. 13.f.2 1.12 M³ 1,513,737.50
esh M7 4.1.1.19 223.28 Kg 13,993.65
ng 4.1.1.21.a 7.45 M² 135,487.00
Sub Jumlah V
AAN ATAP
ap Baja Ringan Zincallume 8.1.1.3. 892.22 M2 165,000.00
llume Color t =0,35 mm A.4.5.2.41.b 892.22 M2 235,235.00
tap Zincallume A.4.5.2.42.a 64.20 M 209,930.60
Woodplak 2 lps 8.1.1.4. 117.25 M 110,000.00
Sub Jumlah VI
JUMLAH TOTAL PEKERJAAN STRUKTUR GEDUNG
AAN STRUKTUR SELASAR DAN RAMP
AAN PENDAHULUAN
an Bowplank 2.2.1.4.a 155.40 M' 65,488.50
Sub Jumlah I
AAN PONDASI
n Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, 8 D U&B 291.00 Btg 1,600,000.00
450 -6 m
gan Mini Pile 25 x 25 K450 1,746.00 M' 120,000.00
an Mini Pile 97.00 Titik 40,000.00
ah Pondasi 2.3.1.1 50.76 M³ 90,612.50
sir t = 10 cm 2.3.1.11 5.97 M³ 141,845.00
a t = 5 cm 4.1.1.4 2.99 M³ 996,598.84
P1
Ready Mix K-300 B. 13.i.2 1.36 M³ 1,682,037.50
gan U32 4.1.1.17.b 148.27 Kg 18,317.75
ng Pondasi 4.1.1.20.a 9.07 M² 135,487.00
P2
Ready Mix K-300 B. 13.i.2 32.03 M³ 1,682,037.50
gan U32 4.1.1.17.b 2,733.78 Kg 18,317.75
ng Pondasi 4.1.1.20.a 121.40 M² 135,487.00
P3
Ready Mix K-300 B. 13.i.2 4.23 M³ 1,682,037.50
gan U32 4.1.1.17.b 285.73 Kg 18,317.75
ng Pondasi 4.1.1.20.a 10.77 M² 135,487.00
ndasi K2 Uk. 30x30 cm
Ready Mix K-225 B. 13.f.2 2.84 M³ 1,513,737.50
gan U32 4.1.1.17.b 1,219.30 Kg 18,317.75
gan U24 4.1.1.17.a 161.16 Kg 16,585.25
ng Pondasi 4.1.1.20.a 37.80 M² 135,487.00

RAB_Gedung OK dan VK 186


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
Sub Jumlah II
AAN STRUKTUR
antai 1
25x55 cm
Ready Mix K-225 B. 13.f.2 6.39 M³ 1,513,737.50
gan U32 4.1.1.17.b 773.08 Kg 18,317.75
gan U24 4.1.1.17.a 209.80 Kg 16,585.25
ng Sloof 4.1.1.21.a 65.30 M² 135,487.00
25x50 cm
Ready Mix K-225 B. 13.f.2 1.33 M³ 1,513,737.50
gan U32 4.1.1.17.b 186.83 Kg 18,317.75
gan U24 4.1.1.17.a 45.83 Kg 16,585.25
ng Sloof 4.1.1.21.a 13.92 M² 135,487.00
20x40 cm
Ready Mix K-225 B. 13.f.2 10.24 M³ 1,513,737.50
gan U32 4.1.1.17.b 1,447.84 Kg 18,317.75
gan U24 4.1.1.17.a 449.68 Kg 16,585.25
ng Sloof 4.1.1.21.a 136.51 M² 135,487.00
ng Uk. 10x45 (blk.25/55)
Ready Mix K-225 B. 13.f.2 2.59 M³ 1,513,737.50
esh M7 4.1.1.19 97.31 Kg 13,993.65
ng Sloof 4.1.1.21.a 51.87 M² 135,487.00
ran Tutup Kolong Uk. 10x35 (blk.25/55) 4.4.2.4 33.66 M² 71,177.04

RAB_Gedung OK dan VK 187


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
ng Uk. 10x40 (blk.25/50)
Ready Mix K-225 B. 13.f.2 0.53 M³ 1,513,737.50
esh M7 4.1.1.19 27.65 Kg 13,993.65
ng Sloof 4.1.1.21.a 10.61 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 7.40 M² 71,177.04
ng Uk.10/50 (blk.20/40)
Ready Mix K-225 B. 13.f.2 2.87 M³ 1,513,737.50
esh M7 4.1.1.19 143.76 Kg 13,993.65
ng Sloof 4.1.1.21.a 57.46 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 34.48 M² 71,177.04
Uk. 30x30 cm Lt.1
Ready Mix K-225 B. 13.f.2 14.54 M³ 1,513,737.50
gan U32 4.1.1.17.b 2,415.87 Kg 18,317.75
gan U24 4.1.1.17.a 442.07 Kg 16,585.25
ng Kolom 4.1.1.22 b 193.80 M² 224,636.50
antai 2
Dack Uk.15/40 elv. 3.360
Ready Mix K-225 menggunakan pompa B. 13.f.1 5.00 M³ 2,041,737.50
gan U32 4.1.1.17.b 571.89 Kg 18,317.75
gan U24 4.1.1.17.a 197.97 Kg 16,585.25
ng Balok 4.1.1.23.b 62.55 M² 228,085.00
ack elv. 3.360
Ready Mix K-225 menggunakan pompa B. 13.f.1 7.67 M³ 2,041,737.50
esh 2xM7 4.1.1.19 584.98 Kg 13,993.65
ng Lantai 4.1.1.24.b 94.21 M² 253,676.50
ran List Plat Dack elv. 3.360 4.4.2.4 162.12 M² 71,177.04
25x55 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.25 M³ 2,041,737.50
gan U32 4.1.1.17.b 773.08 Kg 18,317.75
gan U24 4.1.1.17.a 205.41 Kg 16,585.25
ng Balok 4.1.1.23.b 63.93 M² 228,085.00
20x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 26.32 M³ 2,041,737.50
gan U32 4.1.1.17.b 3,576.49 Kg 18,317.75
gan U24 4.1.1.17.a 1,110.06 Kg 16,585.25
ng Balok 4.1.1.23.b 330.34 M² 228,085.00
Uk. 30x30 cm (elv.4.00-8.00) Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 14.22 M³ 2,041,737.50
gan U32 4.1.1.17.b 2,197.97 Kg 18,317.75
gan U24 4.1.1.17.a 431.87 Kg 16,585.25
ng Kolom 4.1.1.22 b 189.60 M² 224,636.50

RAB_Gedung OK dan VK 188


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6

20x80 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 13.98 M³ 2,041,737.50
gan U32 4.1.1.17.b 2,028.43 Kg 18,317.75
gan U24 4.1.1.17.a 423.51 Kg 16,585.25
ng Balok 4.1.1.23.b 99.89 M² 228,085.00
25x55 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.03 M³ 2,041,737.50
gan U32 4.1.1.17.b 124.30 Kg 18,317.75
gan U24 4.1.1.17.a 34.06 Kg 16,585.25
ng Balok 4.1.1.23.b 10.49 M² 228,085.00
20x40 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 8.51 M³ 2,041,737.50
gan U32 4.1.1.17.b 906.03 Kg 18,317.75
gan U24 4.1.1.17.a 280.40 Kg 16,585.25
ng Balok 4.1.1.23.b 106.36 M² 228,085.00
elv. 7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 22.80 M³ 2,041,737.50
esh 2xM7 4.1.1.19 1,901.52 Kg 13,993.65
ng Lantai 4.1.1.24.b 176.26 M² 253,676.50
ran Plat Dack elv.7.60 4.4.2.4 176.26 M² 71,177.04
Plat Dack elv. 7.60 4.4.2.27 176.26 M² 44,682.00
proofing Plat Dack elv. 7.60 A.4.7.1.10.f 176.26 M² 26,582.05

RAB_Gedung OK dan VK 189


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6

20x45 elv.6.8
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.79 M³ 2,041,737.50
gan U32 4.1.1.17.b 84.13 Kg 18,317.75
gan U24 4.1.1.17.a 23.29 Kg 16,585.25
ng Balok 4.1.1.23.b 8.32 M² 228,085.00
20x40 elv.6.8
Ready Mix K-225 menggunakan pompa B. 13.f.1 2.88 M³ 2,041,737.50
gan U32 4.1.1.17.b 396.01 Kg 18,317.75
gan U24 4.1.1.17.a 126.51 Kg 16,585.25
ng Balok 4.1.1.23.b 38.34 M² 228,085.00

ktis Uk.9x9 cm elv.8.00


K175 4.1.1.4 0.08 M³ 996,598.84
gan U24 4.1.1.17.a 20.73 Kg 16,585.25
ng 4.1.1.20.a 1.73 M² 135,487.00
ktis Uk.9x9 cm elv.8.00
K175 4.1.1.4 0.55 M³ 996,598.84
gan U24 4.1.1.17.a 141.57 Kg 16,585.25
ng 4.1.1.20.a 12.73 M² 135,487.00
Dack elv. 8.00
Ready Mix K-225 menggunakan pompa B. 13.f.1 14.78 M³ 2,041,737.50
esh 2xM7 4.1.1.19 1,121.53 Kg 13,993.65
ng Lantai 4.1.1.24.b 122.91 M² 253,676.50
ran List Plat Dack 4.4.2.4 268.95 M² 71,177.04
Sub Jumlah III
AAN PLAT LANTAI
1
Ready Mix K-225 t = 10 cm B. 13.f.2 29.66 M³ 1,513,737.50
esh 2xM7 4.1.1.19 2,473.98 Kg 13,993.65
ng Lantai 4.1.1.24.c 246.14 M² 228,613.00
2
Ready Mix K-225 t = 10 cm menggunakan pompa B. 13.f.1 29.66 M³ 2,041,737.50
esh 2xM7 4.1.1.19 2,473.98 Kg 13,993.65
ng Lantai 4.1.1.24.b 200.98 M² 253,676.50
Sub Jumlah IV
AAN ATAP
ap Baja Ringan Zincallume 8.1.1.3. 111.72 M2 165,000.00
llume Color t =0,35 mm A.4.5.2.41.b 111.72 M2 235,235.00
tap Zincallume A.4.5.2.42.a 27.46 M 209,930.60
Woodplak 2 lps 8.1.1.4. 54.80 M 110,000.00

RAB_Gedung OK dan VK 190


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
Sub Jumlah V
JUMLAH TOTAL PEKERJAAN STRUKTUR SELASAR DAN RAMP
AAN ARSITEKTUR
AAN DINDING

ng Batako A.4.4.1.19.a 1,224.12 m2 102,991.46


eran 1:4 A.4.4.2.4 2,351.61 m2 71,177.04
ng Keramik 20x40 Cm A.4.4.3.54.a 310.53 m2 345,562.80
ng Wastafel Keramik 30x30 Motif A.4.4.3.35.a 9.18 m2 276,870.00
ng Partisi Cubical U&B 2.00 Unit 3,300,000.00

ng Batako A.4.4.1.19.a 1,158.21 m2 102,991.46


eran 1:4 A.4.4.2.4 1,946.91 m2 71,177.04
ng Keramik 20x40 Cm A.4.4.3.54.a 127.30 m2 345,562.80
ng Wastafel Keramik 30x30 Motif A.4.4.3.35.a 6.20 m2 276,870.00

p
ng Batako A.4.4.1.19.a 277.45 m2 102,991.46
eran 1:4 A.4.4.2.4 554.90 m2 71,177.04

as Medis, & RAM Tangga


ng Batako A.4.4.1.19.a 850.70 m2 102,991.46
eran 1:4 A.4.4.2.4 1,707.74 m2 71,177.04
Sub Jumlah I

RAB_Gedung OK dan VK 191


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
AAN LANTAI

i Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 329.65 m2 391,972.24


i Keramik 60x60 Cm Unpolised Tekstur Kasar Warna Gelap A.4.4.3.34.b 110.02 m2 391,972.24
i Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 16.56 m2 394,282.24
i Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 605.17 m2 394,282.24
i Keramik 30x30 Cm Polised A.4.4.3.35.a 142.28 m2 276,870.00
i Keramik 30x30 Cm Unpolised A.4.4.3.35.a 60.36 m2 276,870.00
i Tangga
ntai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 43.93 m2 276,870.00
ing A.4.4.3.41 84.00 m' 84,685.92
ital Plint A.4.4.3.21 473.25 m' 39,715.94

i Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 275.09 m2 391,972.24


i Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 3.60 m2 394,282.24
i Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 93.64 m2 394,282.24
i Keramik 30x30 Cm Polised A.4.4.3.35.a 132.95 m2 276,870.00
i Keramik 30x30 Cm Unpolised A.4.4.3.35.a 21.01 m2 276,870.00
i Vinyl Homogeneous Heavy Duty Khusus R.OK A.4.4.3.59.a 649.61 m2 774,779.50
i Tangga
ntai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 24.35 m2 276,870.00
ing A.4.4.3.41 46.56 m' 84,685.92
ital Plint A.4.4.3.21 584.47 m' 39,715.94
Sub Jumlah II
AAN PLAFON

nd Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 1,142.13 m2 186,751.40


nd GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 59.51 m2 186,351.00

nd Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 985.18 m2 186,751.40


nd GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 20.45 m2 186,351.00
Sub Jumlah III
AAN PINTU DAN JENDELA

250 cm (Kaca Tempered Frameless 12mm) U&B 2.00 Unit 17,052,750.00


CP Gawang U&B 65.41 m2 935,000.00

x270 cm (Kaca Tempered Frameless 12mm) U&B 3.00 Unit 13,183,087.50

RAB_Gedung OK dan VK 192


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6

x270 cm 10.00 Unit


A.4.2.1.11 92.50 m' 109,840.50
Pintu A.4.6.1.8.a 35.25 m2 882,231.58
l Pintu A.4.6.2.5 80.00 Set 35,702.70
andle A.4.6.2.11.a 20.00 Set 120,928.50
lockcase A.4.6.2.1.a 10.00 Set 241,785.50
Stoper A.4.6.2.13 20.00 Set 292,033.50
Closer A.4.6.2.10 20.00 Set 247,384.50
5 mm A.4.6.2.17 9.60 m2 220,227.70

70 cm 4.00 Unit
A.4.2.1.11 29.40 m' 109,840.50
Pintu A.4.6.1.8.a 7.94 m2 882,231.58
l Pintu A.4.6.2.5 16.00 Set 35,702.70
Handle A.4.6.2.11.a 4.00 Set 120,928.50
lockcase A.4.6.2.1.a 4.00 Set 241,785.50
Stoper A.4.6.2.13 4.00 Set 292,033.50
Closer A.4.6.2.10 4.00 Set 247,384.50
5 mm A.4.6.2.17 2.43 m2 220,227.70

RAB_Gedung OK dan VK 193


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
70 cm 13.00 Unit
A.4.2.1.11 92.95 m' 109,840.50
Pintu A.4.6.1.8.a 25.02 m2 882,231.58
l Pintu A.4.6.2.5 52.00 Set 35,702.70
Handle A.4.6.2.11.a 13.00 Set 120,928.50
lockcase A.4.6.2.1.a 13.00 Set 241,785.50
Stoper A.4.6.2.13 13.00 Set 292,033.50
Closer A.4.6.2.10 13.00 Set 247,384.50
5 mm A.4.6.2.17 5.20 m2 220,227.70

100 cm 1.00 Unit


A.4.2.1.11 3.15 m' 109,840.50
Pintu A.4.6.1.8.a 0.57 m2 882,231.58
l Kupu-Kupu A.4.6.2.6 2.00 Set 25,264.25
e : Pull Plate A.4.6.2.11.b 1.00 Set 49,868.50
Pintu Window bolt with key A.4.6.2.4.a 1.00 Set 87,037.50

x100 cm 1.00 Unit


A.4.2.1.11 6.15 m' 109,840.50
Pintu A.4.6.1.8.a 1.07 m2 882,231.58
l Kupu-Kupu A.4.6.2.6 4.00 Set 25,264.25
e : Pull Plate A.4.6.2.11.b 1.00 Set 49,868.50
Pintu Window bolt with key A.4.6.2.4.a 1.00 Set 87,037.50

20 cm 5.00 Unit
A.4.2.1.11 26.00 m' 109,840.50
Pintu A.4.6.1.8.a 8.08 m2 882,231.58
l Pintu A.4.6.2.5 15.00 Set 35,702.70
Handle A.4.6.2.11.a 5.00 Set 120,928.50
lockcase A.4.6.2.1.a 5.00 Set 241,785.50
Stoper A.4.6.2.13 5.00 Set 292,033.50

20 cm 8.00 Unit
A.4.2.1.11 42.40 m' 109,840.50
Pintu A.4.6.1.8.a 14.34 m2 882,231.58
l Pintu A.4.6.2.5 24.00 Set 35,702.70
Handle A.4.6.2.11.a 8.00 Set 120,928.50
lockcase A.4.6.2.1.a 8.00 Set 241,785.50
Stoper A.4.6.2.13 8.00 Set 292,033.50

RAB_Gedung OK dan VK 194


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
0 cm 6.00 Unit
A.4.2.1.11 152.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 10.52 m2 566,362.50
5 mm A.4.6.2.17 33.82 m2 220,227.70
ment Handle A.4.6.2.11.b 12.00 Set 49,868.50
n Stay A.4.6.2.9 24.00 Set 33,863.50

0 cm 1.00 Unit
A.4.2.1.11 18.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2 566,362.50
5 mm A.4.6.2.17 4.14 m2 220,227.70
ment Handle A.4.6.2.11.b 1.00 Set 49,868.50
n Stay A.4.6.2.9 2.00 Set 33,863.50

70 cm 3.00 Unit
A.4.2.1.11 61.20 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 2.32 m2 566,362.50
5 mm A.4.6.2.17 15.90 m2 220,227.70
ment Handle A.4.6.2.11.b 3.00 Set 49,868.50
n Stay A.4.6.2.9 6.00 Set 33,863.50

0 cm 16.00 Unit
A.4.2.1.11 216.96 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 13.21 m2 566,362.50
5 mm A.4.6.2.17 43.61 m2 220,227.70
ment Handle A.4.6.2.11.b 16.00 Set 49,868.50
n Stay A.4.6.2.9 32.00 Set 33,863.50

RAB_Gedung OK dan VK 195


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6

120 cm 2.00 Unit


A.4.2.1.11 26.40 m' 109,840.50
5 mm A.4.6.2.17 7.83 m2 220,227.70

120 cm 3.00 Unit


A.4.2.1.11 21.24 m' 109,840.50
5 mm A.4.6.2.17 5.81 m2 220,227.70

120 cm 2.00 Unit


A.4.2.1.11 14.16 m' 109,840.50
5 mm A.4.6.2.17 3.87 m2 220,227.70

cm 1.00 Unit
A.4.2.1.11 2.48 m' 109,840.50
5 mm A.4.6.2.17 0.39 m2 220,227.70

cm 1.00 Unit
A.4.2.1.11 4.42 m' 109,840.50
5 mm A.4.6.2.17 0.80 m2 220,227.70

250 cm (Kaca Tempered Frameless 12mm) U&B 1.00 Unit 17,052,750.00


CP Gawang U&B 32.70 m2 935,000.00

x270 cm 13.00 Unit


A.4.2.1.11 120.25 m' 109,840.50
Pintu A.4.6.1.8.a 45.82 m2 882,231.58
l Pintu A.4.6.2.5 104.00 Set 35,702.70
andle A.4.6.2.11.a 26.00 Set 120,928.50
lockcase A.4.6.2.1.a 13.00 Set 241,785.50
Stoper A.4.6.2.13 26.00 Set 292,033.50
Closer A.4.6.2.10 26.00 Set 247,384.50
5 mm A.4.6.2.17 12.48 m2 220,227.70

270 cm 1.00 Unit


A.4.2.1.11 8.86 m' 109,840.50
Pintu Kaca A.4.2.1.13.b 3.25 m2 566,362.50
l Pintu A.4.6.2.5 8.00 Set 35,702.70
andle A.4.6.2.11.a 2.00 Set 120,928.50

RAB_Gedung OK dan VK 196


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 2.00 Set 292,033.50
Closer A.4.6.2.10 2.00 Set 247,384.50
5 mm A.4.6.2.17 0.80 m2 220,227.70

70 cm 17.00 Unit
A.4.2.1.11 121.55 m' 109,840.50
Pintu A.4.6.1.8.a 32.72 m2 882,231.58
l Pintu A.4.6.2.5 68.00 Set 35,702.70
Handle A.4.6.2.11.a 17.00 Set 120,928.50
lockcase A.4.6.2.1.a 17.00 Set 241,785.50
Stoper A.4.6.2.13 17.00 Set 292,033.50
Closer A.4.6.2.10 17.00 Set 247,384.50
5 mm A.4.6.2.17 6.80 m2 220,227.70

20 cm 2.00 Unit
A.4.2.1.11 10.55 m' 109,840.50
Pintu A.4.6.1.8.a 3.85 m2 882,231.58
l Pintu A.4.6.2.5 8.00 Set 35,702.70
Handle A.4.6.2.11.a 2.00 Set 120,928.50
lockcase A.4.6.2.1.a 2.00 Set 241,785.50
Stoper A.4.6.2.13 2.00 Set 292,033.50
Closer A.4.6.2.10 2.00 Set 247,384.50

RAB_Gedung OK dan VK 197


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
20 cm 1.00 Unit
A.4.2.1.11 5.17 m' 109,840.50
Pintu A.4.6.1.8.a 1.70 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
Closer A.4.6.2.10 1.00 Set 247,384.50

100 cm 1.00 Unit


A.4.2.1.11 3.15 m' 109,840.50
Pintu A.4.6.1.8.a 0.57 m2 882,231.58
l Kupu-Kupu A.4.6.2.6 2.00 Set 25,264.25
e : Pull Plate A.4.6.2.11.b 1.00 Set 49,868.50
Pintu Window bolt with key A.4.6.2.4.a 1.00 Set 87,037.50

x100 cm 1.00 Unit


A.4.2.1.11 6.15 m' 109,840.50
Pintu A.4.6.1.8.a 1.07 m2 882,231.58
l Kupu-Kupu A.4.6.2.6 4.00 Set 25,264.25
e : Pull Plate A.4.6.2.11.b 1.00 Set 49,868.50
Pintu Window bolt with key A.4.6.2.4.a 1.00 Set 87,037.50

20 cm 3.00 Unit
A.4.2.1.11 15.60 m' 109,840.50
Pintu A.4.6.1.8.a 4.85 m2 882,231.58
l Pintu A.4.6.2.5 9.00 Set 35,702.70
Handle A.4.6.2.11.a 3.00 Set 120,928.50
lockcase A.4.6.2.1.a 3.00 Set 241,785.50
Stoper A.4.6.2.13 3.00 Set 292,033.50

20 cm 1.00 Unit
A.4.2.1.11 5.30 m' 109,840.50
Pintu A.4.6.1.8.a 1.79 m2 882,231.58
l Pintu A.4.6.2.5 3.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50

20 cm 4.00 Unit
A.4.2.1.11 20.40 m' 109,840.50

RAB_Gedung OK dan VK 198


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
Pintu A.4.6.1.8.a 5.59 m2 882,231.58
l Pintu A.4.6.2.5 12.00 Set 35,702.70
Handle A.4.6.2.11.a 4.00 Set 120,928.50
lockcase A.4.6.2.1.a 4.00 Set 241,785.50
Stoper A.4.6.2.13 4.00 Set 292,033.50

20 cm 2.00 Unit
A.4.2.1.11 8.30 m' 109,840.50
Pintu A.4.6.1.8.a 3.52 m2 882,231.58
Gantung U&B 4.00 Set 143,000.00
ate Handle A.4.6.2.11.a 4.00 Set 120,928.50
Lockcase Sliding A.4.6.2.1.a 2.00 Set 241,785.50

0 cm 19.00 Unit
A.4.2.1.11 482.60 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 33.33 m2 566,362.50
5 mm A.4.6.2.17 107.11 m2 220,227.70
ment Handle A.4.6.2.11.b 38.00 Set 49,868.50
n Stay A.4.6.2.9 76.00 Set 33,863.50

0 cm 1.00 Unit
A.4.2.1.11 18.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2 566,362.50
5 mm A.4.6.2.17 4.14 m2 220,227.70
ment Handle A.4.6.2.11.b 1.00 Set 49,868.50
n Stay A.4.6.2.9 2.00 Set 33,863.50

RAB_Gedung OK dan VK 199


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6

70 cm 1.00 Unit
A.4.2.1.11 20.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2 566,362.50
5 mm A.4.6.2.17 5.30 m2 220,227.70
ment Handle A.4.6.2.11.b 1.00 Set 49,868.50
n Stay A.4.6.2.9 2.00 Set 33,863.50

0 cm 2.00 Unit
A.4.2.1.11 27.12 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 1.65 m2 566,362.50
5 mm A.4.6.2.17 5.45 m2 220,227.70
ment Handle A.4.6.2.11.b 2.00 Set 49,868.50
n Stay A.4.6.2.9 4.00 Set 33,863.50

0 cm & 416x350 cm 1.00 Unit


A.4.2.1.11 72.92 m' 109,840.50
8 mm A.4.6.2.18 31.02 m2 512,270.55

120 cm 4.00 Unit


A.4.2.1.11 52.80 m' 109,840.50
5 mm A.4.6.2.17 15.66 m2 220,227.70

120 cm 6.00 Unit


A.4.2.1.11 42.48 m' 109,840.50
5 mm A.4.6.2.17 11.62 m2 220,227.70

120 cm 4.00 Unit


A.4.2.1.11 28.32 m' 109,840.50
5 mm A.4.6.2.17 7.75 m2 220,227.70

0 cm (Anti Radiasi) A.RAD.05 1.00 Unit 69,069,000.00

cm 2.00 Unit
A.4.2.1.11 4.96 m' 109,840.50
5 mm A.4.6.2.17 0.79 m2 220,227.70

cm 2.00 Unit
A.4.2.1.11 8.84 m' 109,840.50
5 mm A.4.6.2.17 1.60 m2 220,227.70

RAB_Gedung OK dan VK 200


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
p

20 cm 3.00 Unit
A.4.2.1.11 16.12 m' 109,840.50
Pintu A.4.6.1.8.a 6.43 m2 882,231.58
l Pintu A.4.6.2.5 12.00 Set 35,702.70
Handle A.4.6.2.11.a 3.00 Set 120,928.50
lockcase A.4.6.2.1.a 3.00 Set 241,785.50
Stoper A.4.6.2.13 3.00 Set 292,033.50
Closer A.4.6.2.10 3.00 Set 247,384.50
Sub Jumlah IV
AAN SANITAIR

t Duduk tipe 1 A.5.1.1.1 14.00 set 2,765,675.00


er Spray A.5.1.1.19.a 14.00 set 332,334.75
Shower A.5.1.1.19.c 4.00 set 612,834.75
Drain A.5.1.1.14 16.00 set 32,901.00
afel wall hung tipe 1 A.5.1.1.5 4.00 set 1,177,616.00
afel wall hung tipe 2 A.5.1.1.5.a 21.00 set 1,032,416.00
at Cuci Bayi A.5.1.1.5.b 6.00 set 1,177,616.00
1 Lubang dengan Petirasan A.5.1.1.12 1.00 set 1,117,110.50
n Pantry A.5.1.1.19 1.00 set 95,834.75
bar U&B 12.00 set 468,600.00
bar Difable U&B 4.00 set 3,190,000.00
l Hoek A.5.1.1.1.a 1.00 set 4,973,595.00

RAB_Gedung OK dan VK 201


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
Sink A.5.1.1.1.a 2.00 set 4,973,595.00
b Up Sink Double Bay 1.00 set 126,500,000.00
uksi / Bahan Body
ntuk pengoperasian kran air dan sabun dengan manual (pedal / lutut) : Plat SS 304 1.0 mm HL
n : 1400-1800(w)x600(t)x1800(h) mm
Supply : 220V AC
or Unit : Power Lamp / Heather Lamp
u UV : 2 x 30 W Unites 89 PM
t UV : 2 x 30 W/24V
atic Sensor Soup : 2 Pcs Fotex CDR - 10X
Spout : 2 Pcs Stuchi Spol
atic Sensor Water : 2 Pcs Fotex CDR - 30X
r : 1 Pcs 1000 W AC 220V, suhu max 45° C
: 1 Pcs Pipa SS 304 Ø 4"
oid Valve : 2 Pcs Tipe DW-15 24V DC
Meter : 1 Pcs 24V DC
ng Filter : 2 Pcs
g Flexible : SS alpi
or : 1 Pcs 24V DC
Cermin 5 mm ex. Lokal A.4.6.2.20 19.23 m2 531,393.50
Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.81 m3 7,361,243.29

t Duduk tipe 1 A.5.1.1.1 4.00 set 2,765,675.00


er Spray A.5.1.1.19.a 4.00 set 332,334.75
hower A.5.1.1.19.b 2.00 set 249,834.75
n A.5.1.1.19 2.00 set 95,834.75
Drain A.5.1.1.14 9.00 set 32,901.00
afel wall hung tipe 1 A.5.1.1.5 1.00 set 1,177,616.00
afel wall hung tipe 2 A.5.1.1.5.a 6.00 set 1,032,416.00
1 Lubang dengan Petirasan A.5.1.1.12 2.00 set 1,117,110.50
n Pantry A.5.1.1.19 2.00 set 95,834.75
bar U&B 1.00 set 468,600.00
l Hoek A.5.1.1.1.a 1.00 set 4,973,595.00
Sink A.5.1.1.1.a 2.00 set 4,973,595.00
b Up Sink Double Bay 4.00 set 126,500,000.00
uksi / Bahan Body
ntuk pengoperasian kran air dan sabun dengan manual (pedal / lutut) : Plat SS 304 1.0 mm HL
n : 1400-1800(w)x600(t)x1800(h) mm
Supply : 220V AC
or Unit : Power Lamp / Heather Lamp

RAB_Gedung OK dan VK 202


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
u UV : 2 x 30 W Unites 89 PM
t UV : 2 x 30 W/24V
atic Sensor Soup : 2 Pcs Fotex CDR - 10X
Spout : 2 Pcs Stuchi Spol
atic Sensor Water : 2 Pcs Fotex CDR - 30X
r : 1 Pcs 1000 W AC 220V, suhu max 45° C
: 1 Pcs Pipa SS 304 Ø 4"
oid Valve : 2 Pcs Tipe DW-15 24V DC
Meter : 1 Pcs 24V DC
ng Filter : 2 Pcs
g Flexible : SS alpi
or : 1 Pcs 24V DC
Cermin 5 mm ex. Lokal A.4.6.2.20 3.51 m2 531,393.50
Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.35 m3 7,361,243.29
Sub Jumlah V
AAN PENGECATAN

g Luar (weathershield) A.4.7.1.10.b 426.25 m2 29,332.05


g Dalam (easy clean) A.4.7.1.10.a 1,333.88 m2 31,048.05
d A.4.7.1.10.a 761.97 m2 31,048.05

g Luar (weathershield) A.4.7.1.10.b 577.61 m2 29,332.05


g Dalam (easy clean) A.4.7.1.10.a 1,819.16 m2 31,048.05
d A.4.7.1.10.a 730.55 m2 31,048.05

RAB_Gedung OK dan VK 203


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
p
g Luar (weathershield) A.4.7.1.10.b 645.64 m2 29,332.05
g Dalam (easy clean) A.4.7.1.10.a 178.69 m2 31,048.05

as Medis, & RAM Tangga


g Luar (weathershield) A.4.7.1.10.b 1,473.98 m2 29,332.05
d A.4.7.1.10.a 439.67 m2 31,048.05
Sub Jumlah VI
AAN LAIN-LAIN

Tangga :
ndrail dan Railling tangga 1 A.4.2.1.20.a 22.74 m2 457,842.00
ndrail dan Railling tangga 2 A.4.2.1.20.a 24.04 m2 457,842.00
lekat Meja Konter Bahan Multipleks Fin. HPL 5.66 m' 1,500,000.00

Tangga :
ndrail dan Railling ( Void ) A.4.2.1.20.a 26.12 m2 457,842.00
Sub Jumlah VII
TUR KHUSUS RUANG OK
cal Insulated Panel EPS, t. 75 mm, Antibacterial 250.63 m2 913,000.00
dical Insulated Panel EPS, t. 75 mm, Antibacterial 119.38 m2 913,000.00
enum / RAG, tidak termasuk grille 12.00 Unit 3,520,000.00
Timer (jam, countdown, temp, humidity), recessed on wall 3.00 Unit 38,500,000.00
n : 850 (w) x 400 (h) x 350 (t) mm
ng Text : Dot Matrix
r : Sesirion
: 40 W
er, recessed on wall 3.00 Unit 20,900,000.00
n : 800 (w) x 500 (h) x 45 (t) mm
itas : 2 Film
dan Body : SS 304 HL 1.2 mm
u : LED Module 3 mata
turan Kecerahan : Dimme / Rotary Switch
: DC 165 W / 12 V / 8,3 A
S Mirror 304, recessed on wall 8.00 Unit 35,200,000.00
n Luar : 700 (w) x 750 (h) x 600 (t) mm
: SS SUS 304 Mirror, 1.2 mm
m : Interlock Magnetic
Kedua Sisi Pakai Kaca Clear 6 mm
: DC 220 W / 12 V / 4,2 A

RAB_Gedung OK dan VK 204


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
ng Door Manual 2.00 Unit 14,850,000.00
n Opening : 900 (w) x 2200 (h) mm
Bottom Seal
vation Glass : 400 (w) x 600 (h) mm, clear glass 8 mm
soris : Engsel, Lockset & Handle
ing Door Full Hermatic 3.00 Unit 137,500,000.00
n Opening : 1600 (w) x 2200 (h) mm
m Automatic
vation Glass : 400 (w) x 600 (h) mm, clear glass 8 mm
soris : Trackrell; Roda; Frame Door & Kusen
ing Door Full Hermatic 1.00 Unit 126,500,000.00
n Opening : 1600 (w) x 2200 (h) mm
m Automatic
soris : Trackrell; Roda; Frame Door & Kusen
Sub Jumlah VIII
TUR FASADE BANGUNAN
Flat Tebal 0.3 mm + Pemasangan U&B 313.39 m2 935,000.00
Aluminium U&B 81.43 m2 1,036,200.00
age :
LASI BERSALIN 975.80 cm 17,400.00
LASI BEDAH SENTRAL 1,205.40 cm 17,400.00
Sub Jumlah IX
JUMLAH TOTAL PEKERJAAN ARSITEKTUR

RAB_Gedung OK dan VK 205


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
AAN MEKANIKAL ELEKTRIKAL
Penerangan dan Kotak Kontak Lantai 1 & Lantai 2
M 2 x 2.5 mm² dalam High Impact conduit dia. 20 mm

enerangan 161.00 titik 251,112.98


LED Inbow 6 W 4.00 bh 160,000.00
LED Inbow 10 W 45.00 bh 210,000.00
LED Inbow 10 W + Nicad Batery 2.00 bh 864,500.00
LED Inbow 13 W 97.00 bh 256,644.00
LED Inbow 13 W+ Nicad Batery 8.00 bh 929,144.00
d Baret Circular 10 W 5.00 bh 404,375.00
anda 34.00 bh 55,800.00
nggal 27.00 bh 40,455.00
t + baterai 2.00 bh 1,430,000.00
M 3x2.5 mm² dalam High Impact conduit dia. 20 mm
otak kontak 1p 78.00 titik 290,908.00
k kontak dinding 1p 77.00 bh 49,600.00
k kontak dinding 1p 3 lubang 1.00 bh 73,237.50

enerangan 213.00 titik 251,112.98


LED Inbow 6 W 10.00 bh 160,000.00
LED Inbow 10 W 53.00 bh 210,000.00
LED Inbow 10 W + Nicad Batery 5.00 bh 864,500.00
LED Inbow 13 W 55.00 bh 256,644.00
LED Inbow 13 W+ Nicad Batery 6.00 bh 929,144.00
d Baret Circular 10 W 2.00 bh 404,375.00
mar Operasi TL LED (Recess Mounted) 45 Watt Inbow 76.00 bh 2,127,500.00
ikator ruang ok 6.00 bh 1,897,500.00
anda 34.00 bh 55,800.00
nggal 13.00 bh 40,455.00
t + baterai 2.00 bh 1,430,000.00
M 3x2.5 mm² dalam High Impact conduit dia. 20 mm
otak kontak 1p 86.00 titik 290,908.00
strik Pass Box 8.00 titik 290,908.00
strik Door full Hermatik 3.00 titik 290,908.00
strik operating timer 3.00 titik 290,908.00
k kontak dinding 1p 25.00 bh 49,600.00
k Ruang operasi 20 ampere 36.00 bh 80,000.00
k kontak dinding 1p 3 lubang 15.00 bh 73,237.50
k kontak lantai 10.00 bh 351,875.00
dor luar

RAB_Gedung OK dan VK 206


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
enerangan 68.00 titik 251,112.98
d Baret Circular 10 W 67.00 bh 404,375.00
d Baret Circular 10 W + Nicad Batery 1.00 bh 864,375.00
anda 5.00 bh 55,800.00
D R. Tindakan
Finishing aluminium c/w 1 sakelar tunggal, lampu TL LED 2 x 10 Watt, 5 Outlet 11.00 unit 2,359,000.00
otak kontak Bed Head (1 kabel Power untuk 3 kotak kontak) 11.00 titik 290,908.00
ower lampu Bed Head 11.00 titik 251,112.98
Grounding Listrik
52.00 meter 78,000.00
grounding arus kuat tahanan maksimal 2 ohm 2.00 unit 3,500,000.00
grounding Lift arus kuat tahanan maksimal 1 ohm 1.00 unit 3,500,000.00
Grounding medis
Dari P.P Ok ke pentanahan 85.00 meter 40,950.00
36.00 meter 78,000.00
grounding trafo isolasi tahanan maksimal 0,2 ohm 1.00 unit 3,500,000.00
grounding perangkat medis Cath Lab tahanan maksimal 0,5 ohm 1.00 unit 3,500,000.00
Kabel Feeder

RAB_Gedung OK dan VK 207


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
RIBUSI PANEL OK & VK (Wall mounted)
Ukuran 60 x 80 x 20 cm 1.00 bh 3,531,500.00
0A, 36kA, 3P 1.00 bh 3,080,000.00
0A, 18kA, 3P 1.00 bh 1,540,000.00
A, 7,5kA, 3P 2.00 bh 653,800.00
A, 7,5kA, 3P 2.00 bh 653,800.00
A, 7,5kA, 3P 1.00 bh 653,800.00
3P, 10 kA 1.00 bh 553,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,500,000.00
ster tipe 1 3P+N 1.00 bh 4,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
RIBUSI PANEL UPS OK (Wall mounted)
Ukuran 60 x 80 x 20 cm 1.00 bh 3,531,500.00
0A, 36kA, 3P 1.00 bh 3,080,000.00
5A, 18kA, 3P 1.00 bh 1,402,500.00
3P, 10 kA 1.00 bh 553,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,500,000.00
ster tipe 1 3P+N 1.00 bh 4,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
ANEL UPS OK (Wall mounted)
Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
5A, 18kA, 3P 1.00 bh 1,402,500.00
6kA, 3P 1.00 bh 553,500.00
4,5kA, 1P 5.00 bh 85,500.00
4,5kA, 1P 5.00 bh 85,500.00
4,5kA, 1P 1.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
l + Material bantu 1.00 lot 1,000,000.00

RAB_Gedung OK dan VK 208


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
ANEL OK 2 (Wall mounted) 1.00 Lot 10,500,000.00
4,5kA, 2P 2.00 bh
4,5kA, 2P 5.00 bh
4,5kA, 1P 1.00 bh
ter, 3CT + selector switch 1.00 bh
+ selector switch 1.00 bh
Holder 3.00 bh
nda 3.00 bh
1.00 lot
l + Material bantu 1.00 lot
ransformer 5KVA 1.00 lot
ANEL OK 3 (Wall mounted) 1.00 Lot 10,500,000.00
4,5kA, 2P 2.00 bh
4,5kA, 2P 5.00 bh
4,5kA, 1P 1.00 bh
ter, 3CT + selector switch 1.00 bh
+ selector switch 1.00 bh
Holder 3.00 bh
nda 1.00 bh
1.00 lot
l + Material bantu 1.00 lot
ransformer 5KVA 1.00 lot

RAB_Gedung OK dan VK 209


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
ANEL OK 4 (Wall mounted) 1.00 Lot 10,500,000.00
4,5kA, 2P 2.00 bh
4,5kA, 2P 5.00 bh
4,5kA, 1P 1.00 bh
ter, 3CT + selector switch 1.00 bh
+ selector switch 1.00 bh
Holder 3.00 bh
nda 1.00 bh
1.00 lot
l + Material bantu 1.00 lot
ransformer 5KVA 1.00 lot
ANEL OK 5 (Wall mounted) 1.00 Lot 10,500,000.00
4,5kA, 2P 2.00 bh
4,5kA, 2P 5.00 bh
4,5kA, 1P 1.00 bh
ter, 3CT + selector switch 1.00 bh
+ selector switch 1.00 bh
Holder 3.00 bh
nda 1.00 bh
1.00 lot
l + Material bantu 1.00 lot
ransformer 5KVA 1.00 lot
ANEL OK 6 (Wall mounted) 1.00 Lot 10,500,000.00
4,5kA, 2P 2.00 bh
4,5kA, 2P 5.00 bh
4,5kA, 1P 1.00 bh
ter, 3CT + selector switch 1.00 bh
+ selector switch 1.00 bh
Holder 3.00 bh
nda 1.00 bh
1.00 lot
l + Material bantu 1.00 lot
ransformer 5KVA 1.00 lot

ANEL LANTAI 1 (Wall mounted)


Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 6kA, 3P 2.00 bh 553,500.00
A, 6kA, 3P 4.00 bh 553,500.00
4,5kA, 1P 10.00 bh 85,500.00
4,5kA, 1P 12.00 bh 85,500.00

RAB_Gedung OK dan VK 210


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
ANEL LANTAI 2 (Wall mounted)
Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 4,5kA, 1P 2.00 bh 85,500.00
4,5kA, 1P 9.00 bh 85,500.00
4,5kA, 1P 15.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
l + Material bantu 1.00 lot 1,000,000.00

RAB_Gedung OK dan VK 211


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
ANEL AC 1 (Wall mounted)
Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 4,5kA, 1P 11.00 bh 85,500.00
4,5kA, 1P 7.00 bh 85,500.00
4,5kA, 1P 7.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
ANEL AC 2 (Wall mounted)
Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 4,5kA, 1P 3.00 bh 85,500.00
4,5kA, 1P 11.00 bh 85,500.00
4,5kA, 1P 4.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
ANEL AC OK (OUTDOOR TYPE)
Ukuran 60 x 1200 x 25 cm 1.00 bh 6,000,000.00
0A, 18kA, 3P 1.00 bh 1,540,000.00
A, 10kA, 3P 6.00 bh 653,800.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,500,000.00
ure 1.00 bh 2,500,000.00
l + Material bantu 1.00 lot 1,000,000.00
rol pompa air bersih transfer 1.00 bh By Pompa Transfer
rol pompa Booster 1.00 bh By Pompa Booster
der
FGBY 4x185 mm² (SDP IPSRS - SDP OK & VK) 138.00 m' 1,736,250.00
FGBY 4x185 mm² (SDP IPSRS - SDP UPS OK) 158.00 m' 1,736,250.00
Y 4x95 mm² (SDP OK - UPS 120 KVA Cath lab) 17.00 m' 907,400.00

RAB_Gedung OK dan VK 212


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
Y 4x95 mm² (UPS 120 KVA Cath Lab -Panel Main swicth- Mesin Cath Lab) BY OTHER
Y 4x50 mm² (SDP OK - PP UPS OK) 13.00 m' 464,750.00
Y 4x50 mm² (PP UPS OK - UPS OK 60 KVA) 18.00 m' 464,750.00
Y 3x10 mm² (PP UPS OK - PP OK 2) 37.00 m' 65,234.00
Y 3x10 mm² (PP UPS OK - PP OK 3) 38.00 m' 65,234.00
Y 3x10 mm² (PP UPS OK - PP OK 4) 55.00 m' 65,234.00
Y 3x10 mm² (PP UPS OK - PP OK 5) 56.00 m' 65,234.00
Y 3x10 mm² (PP UPS OK - PP OK 6) 66.00 m' 65,234.00
Y 4x16 mm² (SDP OK & VK - PP LANTAI 1) 12.00 m' 166,400.00
Y 4x10 mm² (SDP OK & VK - PP LANTAI 2) 20.00 m' 84,058.00
Y 4x16 mm² (SDP OK & VK - PP AC 1) 14.00 m' 166,400.00
Y 4x10 mm² (SDP OK & VK - PP AC 2) 22.00 m' 84,058.00
Y 4(1cx70) mm² (SDP OK & VK - PP AC OK) 35.00 m' 644,800.00
Y 4x10 mm² (SDP OK & VK - PP Lift) 25.00 m' 84,058.00
Y 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 1 70.00 m' 25,480.00
Y 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 2 80.00 m' 25,480.00
Y 4x4 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m' 42,900.00
Y 3x4 mm² (PP LANTAI 2 - POMPA BOOSTER) 35.00 m' 28,860.00
Arus kuat
120 mm² (Grounding Pentanahan 1 - SDP OK & VK) 20.00 m' 195,000.00
120 mm² (Grounding Pentanahan 2 - SDP UPS OK ) 42.00 m' 195,000.00
25 mm² (SDP UPS OK - UPS OK - PP UPS OK ) 24.00 m' 40,950.00
50 mm² (Grounding Pentanahan 3 - UPS Cath lab 120 KVA) 40.00 m' 78,000.00
6 mm² (Trafo isolasi - Grounding pentanahan 4 ) 70.00 m' 11,700.00
6 mm² (PP Lift - Grounding pentanahan 5 ) 43.00 m' 11,700.00
10 mm² (SDP OK & VK - PP Lantai 1) 12.00 m' 22,100.00

RAB_Gedung OK dan VK 213


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
6 mm² (SDP OK & VK - PP Lantai 2) 20.00 m' 11,700.00
10 mm² (SDP OK & VK - PP AC 1) 14.00 m' 22,100.00
6 mm² (SDP OK & VK - PP AC 2) 22.00 m' 11,700.00
50 mm² (SDP OK & VK - PP AC OK) 35.00 m' 78,000.00
6 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m' 11,700.00
4 mm² (PP Lantai 1 - DUMB WAITER 1 70.00 m' 10,400.00
4 mm² (PP Lantai 1 - DUMB WAITER 2 80.00 m' 10,400.00

Kabel Ladder dan Tray

/cage uk lebar 400 mm x 3000 mm H 100 12.00 m' 345,600.00


/cage uk lebar 300 mm x 3000 mm H 50 46.00 m' 230,400.00
/cage uk lebar 200 mm x 3000 mm H 50 + Cover 12.00 m' 217,290.00
n 30 cm 1.00 bh 151,110.00
ran 30 cm 1.00 bh 163,875.00
er Ukuran 30 cm 1.00 bh 96,225.00
er Ukuran 20 cm 3.00 bh 106,214.00
2.00 bh 204,585.00
g(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls 2,773,815.30

/cage uk lebar 400 mm x 3000 mm H 100 22.00 m' 345,600.00


/cage uk lebar 300 mm x 3000 mm H 50 30.00 m' 230,400.00
/cage uk lebar 200 mm x 3000 mm H 50 + cover 28.00 m' 217,290.00
n 30 cm 3.00 bh 151,110.00
ran 30 cm 1.00 bh 163,875.00
er Ukuran 20 cm 5.00 bh 106,214.00
ran 20 cm 4.00 bh 106,214.00
6.00 bh 204,585.00
g(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls 3,509,994.15
ah

/cage uk lebar 200 mm x 3000 mm H 50 68.00 m' 149,040.00


ran 20 cm 1.00 bh 120,000.00
n 20 cm 2.00 bh 106,214.00
er Ukuran 20 cm 3.00 bh 106,214.00
g(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls 1,570,072.20

/cage uk lebar 200 mm x 3000 mm H 50 53.00 m' 149,040.00


ran 20 cm 1.00 bh 120,000.00
er Ukuran 20 cm 3.00 bh 106,214.00

RAB_Gedung OK dan VK 214


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
n 20 cm 1.00 bh 106,214.00
g(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls 1,266,596.40
trik Cadangan
g Operasi OK 60 Kva 3 Phase, 3 Phase in 1 Phase out 1.00 ls BY OTHER
g Operasi Cath Lab 120 Kva , 3 Phase in 3 Phase out (cath Lab) 1.00 ls BY OTHER
Sub Jumlah Instalasi Penerangan & kotak kontak
Tata Udara / AC Lantai 1 & 2
C lengkap dengan Bracket, Pipa referigerant & Drain, pengkabelan & supporting

ower AC 1 Fasa (NYM 3x2.5 mm²) 18.00 titik 431,816.00


ower AC 3 Fasa (NYM 4x2.5 mm²+NYA 2.5 mm² ) 2.00 titik 580,160.00
oning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 3.00 unit 4,940,000.00
oning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 4.00 unit 4,940,000.00
oning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 4.00 unit 5,120,000.00
oning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 1.00 unit 8,580,000.00
oning split Kap. 18000 BTUH / 2 pk tipe Ceiling Casette 6.00 unit 20,240,000.00
oning split Kap. 27000 BTUH / 3 pk tipe Ceiling Casette 2.00 unit 29,205,000.00
p kontak AC 1 phase 12.00 bh 172,000.00
gerant 1/4″ + 3/8″ + Isolasi 132.00 m' 63,920.80
gerant 1/4″ + 1/2″ + Isolasi 84.00 m' 77,145.80
gerant 3/8″ + 5/8″ + Isolasi 30.00 m' 96,600.00
PVC AW 1 1/4" + Isolasi 58.00 m' 13,990.00
PVC AW 1'' + Isolasi 45.00 m' 42,000.00
PVC AW 3/4'' + Isolasi 80.00 m' 38,000.00

RAB_Gedung OK dan VK 215


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6

ower AC 1 Fasa (NYM 3x2.5 mm²) 19.00 titik 431,816.00


oning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 2.00 unit 4,940,000.00
oning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 3.00 unit 4,940,000.00
oning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 2.00 unit 5,120,000.00
oning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 6.00 unit 8,580,000.00
oning split Kap. 18000 BTUH / 2 pk tipe Ceiling Casette 6.00 unit 20,240,000.00
p kontak AC 1 phase 13.00 bh 172,000.00
gerant 1/4″ + 3/8″ + Isolasi 105.00 m' 63,920.80
gerant 1/4″ + 1/2″ + Isolasi 180.00 m' 77,145.80
PVC AW 1 1/4" + Isolasi 60.00 m' 51,206.00
PVC AW 1'' + Isolasi 50.00 m' 42,000.00
PVC AW 3/4'' + Isolasi 76.00 m' 38,000.00
I FAN LANTAI 1 & 2
ower Fan 1 Fasa (NYM 3x2.5 mm²) 22.00 titik 260,658.00
m flexible ducting 8 inch 15.00 m' 63,700.00
hausth Fan tipe sirocco 50 cfm 18.00 unit 912,680.00
hausth Fan tipe sirocco 100 cfm 2.00 unit 1,384,020.00
kelas D dia. 100 mm atau 4" 126.00 m' 117,300.00
m flexible ducting 4 inch 36.00 m' 31,850.00
aust fan Toilet ukuran 20 x 20 cm 8.00 bh 300,000.00
Wall Exchaust FAN 10" kap. 300 CFM 0.4 in wg low noise c/w asesories 2.00 unit 896,000.00
Sub Jumlah Instalasi Tata Udara / AC Lantai 1 & 2
Ruang Operasi (OK)
Operasi 2 Lengkap Dengan aksessoris PMK NO 24 Tahun 2016
r : 19 - 23 ˚C
umidity : 45 - 60 %
e Ruang : 4 S/d 20 x jam
isingan : 45 dBA
dara : positif
engan:
utama :
type Split duct air cooled 1.00 unit 79,511,900.00
t Duct
100.000 Btu/h
lay 11,4 Kw/380 V/ 3p
Fan/Flug type c/w speed control 3200 cfm 1.00 unit 47,250,000.00
st Fan tipe axial 506 cfm 1.00 unit 13,345,800.00

Ducting,Asesories ducting,Filter,ekerjaan Electrical 1.00 Lot 35,000,000.00


:

RAB_Gedung OK dan VK 216


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
rigerant Cooper Astm B280 c/w isolasi & fittings
in c/w isolasi

duct bahan Polyurethane c/w supporting 1.00 lot 63,000,000.00


5 x 30 cm
0x 35 cm
50 x35 cm
duct bahan Polyurethane c/w supporting 1.00 lot 49,000,000.00
5 x 30 cm
5 x 35 cm
5 x 35 cm
uct bahan Polyurethane c/w supporting 1.00 lot 34,762,500.00
Low Return
box
0 x 25 cm
Grill ukuran 30 x 25 cm
ducting :
35 4.00 bh 708,750.00
amper Return 4.00 bh 607,500.00
amper Freash air 1.00 bh 877,500.00
ater 6300 watt 1.00 bh 33,750,000.00

RAB_Gedung OK dan VK 217


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6

LTER 2.00 unit 472,500.00


Washable
Polyester Filter
90~95% Based On 10 µm
m FILTER 2.00 unit 472,500.00

90~95% Based On 1 µm
FILTER Type 4.00 unit 5,872,500.00
4
99,99% Based On 0,3 µm
lter
lter Pre + medium + isolasi 1.00 unit 11,340,000.00
lter Hepa(celling) 4.00 unit 14,805,000.00
Electrical Lengkap dengan 1.00 Lot 60,750,000.00
trol AC
er (unit ac,outdoor ac, & Booster fan)NYY
trol NYA
differensial indikator filter udara

Operasi 3 Lengkap Dengan aksessoris PMK NO 24 Tahun 2016


r : 19 - 23 ˚C
umidity : 45 - 60 %
e Ruang : 4 S/d 20 x jam
isingan : 45 dBA
dara : positif
engan:
utama :
type Split duct air cooled 1.00 unit 79,511,900.00
t Duct
100.000 Btu/h
lay 11,4 Kw/380 V/ 3p
Fan/Flug type c/w speed control 3200 cfm 1.00 unit 47,250,000.00
st Fan tipe axial 506 cfm 1.00 unit 13,345,800.00

Ducting,Asesories ducting,Filter,ekerjaan Electrical 1.00 Lot 35,000,000.00


:
rigerant Cooper Astm B280 c/w isolasi & fittings
in c/w isolasi

duct bahan Polyurethane c/w supporting 1.00 lot 63,000,000.00

RAB_Gedung OK dan VK 218


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
5 x 30 cm
0x 35 cm
50 x35 cm
duct bahan Polyurethane c/w supporting 1.00 lot 49,000,000.00
5 x 30 cm
5 x 35 cm
5 x 35 cm
uct bahan Polyurethane c/w supporting 1.00 lot 34,762,500.00
Low Return
box
0 x 25 cm
Grill ukuran 30 x 25 cm
ducting :
35 4.00 bh 708,750.00
amper Return 4.00 bh 607,500.00
amper Freash air 1.00 bh 877,500.00
ater 6300 watt 1.00 bh 33,750,000.00

RAB_Gedung OK dan VK 219


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6

LTER 2.00 unit 472,500.00


Washable
Polyester Filter
90~95% Based On 10 µm
m FILTER 2.00 unit 472,500.00

90~95% Based On 1 µm
FILTER Type 4.00 unit 5,872,500.00
4
99,99% Based On 0,3 µm
lter
lter Pre + medium + isolasi 1.00 unit 11,340,000.00
lter Hepa(celling) 4.00 unit 14,805,000.00
Electrical Lengkap dengan 1.00 Lot 60,750,000.00
trol AC
er (unit ac,outdoor ac, & Booster fan)NYY
trol NYA
differensial indikator filter udara

Operasi 6 Lengkap Dengan aksessoris PMK NO 24 Tahun 2016


r : 19 - 23 ˚C
umidity : 45 - 60 %
e Ruang : 4 S/d 20 x jam
isingan : 45 dBA
dara : positif
engan:
utama :
type Split duct air cooled 1.00 unit 79,511,900.00
t Duct
100.000 Btu/h
lay 11,4 Kw/380 V/ 3p
Fan/Flug type c/w speed control 3000 cfm 1.00 unit 45,500,000.00
st Fan tipe axial 506 cfm 1.00 unit 13,345,800.00

Ducting,Asesories ducting,Filter,ekerjaan Electrical 1.00 Lot 35,000,000.00


:
rigerant Cooper Astm B280 c/w isolasi & fittings
in c/w isolasi

duct bahan Polyurethane c/w supporting 1.00 lot 60,750,000.00

RAB_Gedung OK dan VK 220


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
5 x 30 cm
0x 35 cm
50 x35 cm
duct bahan Polyurethane c/w supporting 1.00 lot 47,250,000.00
5 x 30 cm
5 x 35 cm
5 x 35 cm
uct bahan Polyurethane c/w supporting 1.00 lot 34,762,500.00
Low Return
box
0 x 25 cm
Grill ukuran 30 x 25 cm
ducting :
35 4.00 bh 708,750.00
amper Return 4.00 bh 607,500.00
amper Freash air 1.00 bh 877,500.00
ater 5400 watt 1.00 bh 32,500,000.00

RAB_Gedung OK dan VK 221


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6

LTER 2.00 unit 472,500.00


Washable
Polyester Filter
90~95% Based On 10 µm
m FILTER 2.00 unit 472,500.00

90~95% Based On 1 µm
FILTER Type 4.00 unit 5,872,500.00
4
99,99% Based On 0,3 µm
lter
lter Pre + medium + isolasi 1.00 unit 11,340,000.00
lter Hepa(celling) 4.00 unit 14,805,000.00
Electrical Lengkap dengan 1.00 Lot 60,750,000.00
trol AC
er (unit ac,outdoor ac, & Booster fan)NYY
trol NYA
differensial indikator filter udara
Sub Jumlah Instalasi Tata Udara / AC Khusus Ruang OK
Sub Jumlah Total Instalasi Tata Udara / AC
Telephone Lantai 1 & Lantai 2
abel ITC 2x0.6mm² dalam High Impact conduit dia. 20 mm
elephone 14.00 titk 420,600.00
Telephone single line 14.00 bh BY OTHER
phone dinding 1 Pole 14.00 bh 85,000.00
Utama
PABX kap. 6 co line 32Extention lengkap dengan : 1.00 set 20,015,000.00
t PABX, Power suplai, memory card, Extension card, analog card
ngan & Pemrograman
VA 1.00 ls 5,932,000.00
c/w frame & LSA40 Ext. 1.00 set 4,900,000.00
40x2x0.6mm² (MDF - PABX) 10.00 m' 417,500.00
Konsul + Pesawat Operator 1.00 set 4,850,000.00
Sub Jumlah Instalasi Telephone
Fire Alarm Lantai 1 & Lantai 2
2x1x1.5 mm² dalam High Impact conduit dia. 20 mm
eat Detector type Rate Of Rise (ROR) 74.00 titik 219,500.00
ctor ROR 58.00 bh 192,025.00
tector 16.00 bh 640,640.00
e 7.00 unit 15,000.00

RAB_Gedung OK dan VK 222


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
1.00 unit 341,500.00
arm bel 1.00 unit 189,500.00
amp 1.00 unit 198,500.00
ndicating lamp 1.00 unit 189,500.00
sh button 1.00 unit 335,000.00
anual push button 1.00 unit 189,500.00
Utama
rol Fire Alarm (MCFA) tipe konvensional 10 Zone lengkap dengan peralatan 1.00 unit 14,375,000.00
man MCFA 1.00 unit 4,000,000.00
VA 1.00 ls 5,932,000.00
Sub Jumlah Instalasi Fire Alarm
Tata Suara Lantai 1 & Lantai 2
MHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
eilling Speaker 26.00 titik 326,400.00
eaker 3 W 26.00 bh 225,165.00
ontrol & Instalasi 8.00 bh 253,050.00
eaker 10 W c/w bracket & material bantu 6.00 bh 758,775.00
Utama
elector 10 zone 1.00 unit 8,500,800.00
er Amplifier 30 W 1.00 unit 8,400,000.00
ower Amplifier 120 W 2.00 unit 3,738,000.00
r 1.00 unit 5,538,400.00
Microphone 1.00 unit 868,000.00
crophone 1.00 unit 7,675,500.00
VA 1.00 ls 5,932,000.00
abinet Rack 1.00 unit 18,046,875.00
Sub Jumlah Instalasi Tata Suara

RAB_Gedung OK dan VK 223


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
Kabel Wifi Lantai 1 & Lantai 2
ot
P Cat 6 dalam High Impact conduit dia. 20 mm
abel Data Wifi 4.00 titik 435,000.00
s Point 802,11n - 2,4GHz/5GHz R11 Meter 4.00 bh 1,665,000.00
otak Kontak untuk Wifi (NYM 3x2,5mm2) 4.00 titik 290,908.00
tak Outbow 4.00 bh 49,600.00
Switch Hub untuk UTP cat 6. kap 24 Port 1.00 bh 3,600,000.00
ower Switch Hub & Kotak Kontak. 1.00 bh 290,908.00
witch/ Hub ke Hub Consentrator Ke eksisting 1.00 titik BY OTHER
Sub Jumlah Instalasi Kabel Wifi
CCTV Lantai 1 & Lantai 2
AXIAL. RG 59 18AWG BC 95% dengan kabel power dalam High Impact conduit dia. 20 mm
amera CCTV 15.00 titik 460,000.00
lution Dome Camera high resolution lengkap dengan Power adaptor & asesorie 14.00 bh 522,600.00
lution In door Box CCD Camera day and night lengkap dengan Power adaptor d 1.00 bh 1,355,000.00
utama / Sentral CCTV
TV lengkap dengan peralatan, pemasangan, pengkabelan & asesories
Kap. 8 Channel C/W Hard Disks 2 terrabyte 2.00 unit 6,492,200.00
r 32 inch 2.00 unit 4,000,000.00
VA 2.00 ls 8,690,000.00
V 2.00 ls 2,000,000.00
Sub Jumlah Instalasi CCTV
, Kotor dan Vent Lantai 1 & Lantai 2
AW komplit dgn galian, bobokan, Pengecatan, fitting & penggantung
kelas AW dia. 150 mm atau 6" 74.00 m' 260,524.00
kelas AW dia. 100 mm atau 4" 468.00 m' 135,437.50
kelas AW dia. 80 mm atau 3" 88.00 m' 89,190.75
kelas AW dia. 50 mm atau 2" 124.00 m' 56,562.00
kelas AW dia.32 mm atau 1 1/4" 58.00 m' 41,206.00
rease trap pelat stainless ukuran (Pxlxt) 50x30x45 cm 3.00 unit 2,812,500.00
mpung infeksius kap. 3 m3 1.00 unit 12,000,000.00

eton & Tutup beton


n penetral logam

mpung(Sumpit) kap. 2 m3 2.00 unit 10,000,000.00

eton & Tutup beton


n penetral logam

RAB_Gedung OK dan VK 224


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
lup Sewage Kapasitas 100 L/m lengkap dengan instalasi power + aksesoris p 2.00 unit 3,965,908.00
Bio Limbah rumah sakit Kapasitas 3.000 Liter Lengkap dengan 2.00 unit 25,300,000.00
eling pengikat
ngurai dan tablet disinfeksikan
eptictank Bio (dinding Bata) + Tutup Plat besi 1,2 mm 2.00 unit 2,000,000.00
ak 30X30 Clean out 4 inci(area lantai 1) 15.00 Lot 750,000.00
hole dak bak bata/plesteran

(area lantai 2) 10.00 bh 138,281.25


upporting(Gantungan Pipa Besi Siku 50mm, Dynabolt, Mur & baut ) 1.00 lot 16,253,017.20

n & pemasangan sistem IPAL EKSISTING


Sub Jumlah Instalasi Air Bekas, Kotor dan Vent
Lantai 1 & Lantai 2
PN 10 lengkap dengan fitting, bobokan & Penggantung
PN 10 dia. 50 atau 1 1/2 " 110.00 m' 146,756.50
PN 10 dia. 40 atau 1 1/4 " 122.00 m' 101,321.00
PN 10 dia. 32 atau 1 " 128.00 m' 69,764.75
PN 10 dia. 25 atau 3/4" 36.00 m' 52,052.00
PN 10 dia. 20 atau 1/2" 442.00 m' 38,984.00
e dia. 50 atau 1 1/2 " 2.00 bh 420,000.00
e dia. 40 atau 1 1/4 " 1.00 bh 384,000.00
e dia. 32 atau 1 " 4.00 bh 360,000.00
upporting(Gantungan Pipa Besi Siku 30mm, Dynabolt, Mur & baut ) 1.00 lot 11,552,613.00

RAB_Gedung OK dan VK 225


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
RANSFER AIR BERSIH
mpa Transfer air bersih kap. 8m3/jam Total head 40 meter 2 kw (1 Pompa) (leng 1.00 set 33,500,000.00
1 1/2''
ve 1 1/2''
1 1/2''
Gauge
rol pompa air bersih transfer
/Struktur reservoir Ground Water Tank (GWT) kap. 2x50 m3 & rumah pompa 1.00 ls By SIPIL
IH di Atap
1.00 set 1,250,000.00
e 1 1/2 '' 7.00 bh 420,000.00
Fiber kap. 2000 liter ukuran : dia. 1.45 tinggi 1.5 meter lengkap dengan peralatan 2.00 unit 6,055,577.50
el Control 2.00 unit 850,000.00
mpa Booster air bersih kap. 5m3/jam Total head 45 meter 0,816Kw lengkap deng 1.00 unit 14,916,600.00
Sub Jumlah Instalasi Air Bersih

PN 20 lengkap dengan fitting, bobokan & Penggantung


PN 20 dia. 15 mm atau 1/2" 16.00 m' 51,689.00
e 1/2'' 4.00 bh 265,000.00
ower Water Heater c/w Kotak kontak 4.00 bh 251,112.98
ter listrik kap. 15 liter c/w asesories 4.00 bh 4,348,500.00
upporting(Gantungan Pipa Besi Siku 30mm, Dynabolt, Mur & baut ) 1.00 lot 1,014,273.80
Sub Jumlah Instalasi Air Panas
ulangan Kebakaran Lantai 1 & Lantai 2
uisher kap. 3 Kg Klass ABC tipe CO2 6.00 unit 1,864,000.00
Sub Jumlah Instalasi Penanggulangan Kebakaran
ir hujan
kelas AW dia. 100 mm atau 4" 612.00 m' 135,437.50
kelas AW dia. 150 mm atau 6" 160.00 m' 260,524.00
ak 30X30 Clean out 4 inci(area lantai 1) 4.00 Lot 750,000.00
hole dak bak bata/plesteran
4 inci
dia. 100 mm atau 4" 51.00 bh 497,950.00
upporting 1.00 lot 12,757,159.00
ainase tipe terbuka lengkap dengan : m' By Sipil
ol 50X50 bh By Sipil
Sub Jumlah Instalasi Saluran Air Hujan
Gas Medis Lantai 1 & Lantai 2
s medis lengkap dengan acessories, Pipa tembaga+penahan pipa
medis Oksigen 35.00 bh 1,365,900.00
er 8 mm² O2 ~ 3/8" OD 70.00 m' 100,689.66

RAB_Gedung OK dan VK 226


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
er 12 mm² O2 ~ 1/2" OD 70.00 m' 126,379.31
er 15 mm² O2 ~ 5/8" OD 58.00 m' 163,017.24
er 20 mm² O2 ~ 3/4" OD 55.00 m' 211,206.90
er 25 mm² O2 ~ 1" OD 65.00 m' 271,206.90
medis Vacuum 29.00 bh 1,365,900.00
er 8 mm² Vacuum ~ 3/8" OD 58.00 m' 100,689.66
er 12 mm² Vacuum ~ 1/2" OD 72.50 m' 126,379.31
er 15 mm² VAcuum ~ 5/8" OD 55.00 m' 163,017.24
er 20 mm² Vacuum ~ 3/4" OD 115.00 m' 211,206.90
medis Compressed Air 4 bar 18.00 bh 1,365,900.00
er 8 mm² Compessed Air 4 bar ~ 3/8" OD 36.00 m' 100,689.66
er 12 mm² Compessed Air 4 bar ~ 1/2" OD 45.00 m' 126,379.31
er 15 mm² Compessed Air 4 bar ~ 5/8" OD 35.00 m' 163,017.24
er 20 mm² Compessed Air 4 bar 3/4" OD 118.00 m' 211,206.90
medis Nitrous Oksida 12.00 bh 1,365,900.00
er 8 mm² Nitrous Oksida ~ 3/8" OD 24.00 m' 100,689.66
er 12 mm² Nitrous Oksida ~ 1/2" OD 30.00 m' 126,379.31
er 15 mm² Nitrous Oksida ~ 5/8" OD 35.00 m' 163,017.24
er 20 mm² Nitrous Oksida ~ 3/4" OD 118.00 m' 211,206.90
medis karbon dioksida 12.00 bh 1,365,900.00
er 8 mm² karbon dioksida ~ 3/8" OD 24.00 m' 100,689.66
er 12 mm² karbon dioksida ~ 1/2" OD 30.00 m' 126,379.31
er 15 mm² karbon dioksida ~ 5/8" OD 34.00 m' 163,017.24
er 20 mm² karbon dioksida ~ 3/4" OD 118.00 m' 211,206.90
Valve 5 Line 1.00 unit 9,831,250.00

RAB_Gedung OK dan VK 227


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB
ANALISA (Rp.)

2 3 4 5 6
ea Alarm 5 gas 1.00 unit 17,793,737.50
porting 1.00 ls 19,435,553.86

/Struktur Sentral Gas Medis 1.00 ls BY OTHER


rbon dioksida 1.00 ls BY OTHER
rous Oksida 1.00 ls BY OTHER
sigen 1.00 ls BY OTHER
cuum 1.00 ls BY OTHER
mpressed air 1.00 ls BY OTHER
Sub Jumlah Instalasi Gas Medis
Petir
inal Radius 80 meter 1.00 unit 13,500,000.00
ductor NYY 1X70 mm² 49.00 m 161,200.00
² ring grounding 35.00 m 78,000.00
grounding tahanan max 2 ohm 1.00 set 3,500,000.00
yangga penangkal petir 9 meter 1.00 unit 4,550,000.00
Sub Jumlah Instalasi Penyalur Petir
VATOR
or kap 1000 kg (2 lantai/2 stop) Lengkap Dengan 1.00 unit 500,000,000.00
pe bed(bed elevator)
2 panel centre opening
ainless Hairlined
er Kapasitas 100 Kg 2 lantai Termasuk Biaya ongkos kirim & jasa 2.00 unit 132,300,000.00
x 700(w) x 700(D) x 800(H)
sipil Untuk Lift (beam,wp,baja & asseories) 1.00 lot 45,000,000.00
sipil Untuk Dumb waiter (beam,wp,baja & asseories) 2.00 lot 30,000,000.00
Sub Jumlah Instalasi Bed Elevator
JUMLAH TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL

RAB_Gedung OK dan VK 228


REKAPITULASI RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
PEKERJAAN : PEMBANGUNAN GEDUNG RADIOLOGI DAN LABORATORIUM
DINAS / INSTANSI : RUMAH SAKIT UMUM DAERAH DR. AGOESDJAM
LOKASI : JL. MAYJEND D.I. PANJAITAN NO. 51 KABUPATEN KETAPANG
TAHUN ANGGARAN : 2018

NO. URAIAN PEKERJAAN

1 2
A PEKERJAAN STRUKTUR GEDUNG
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PONDASI
III PEKERJAAN STRUKTUR
IV PEKERJAAN PLAT LANTAI
V PEKERJAAN TANGGA
VI PEKERJAAN ATAP
Sub Jumlah Pekerjaan Struktur Gedung
B PEKERJAAN STRUKTUR SELASAR
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PONDASI
III PEKERJAAN STRUKTUR
IV PEKERJAAN PLAT LANTAI
V PEKERJAAN ATAP
Sub Jumlah Pekerjaan Struktur Selasar
C PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
II PEKERJAAN LANTAI
III PEKERJAAN PLAFON
IV PEKERJAAN PINTU DAN JENDELA
V PEKERJAAN SANITAIR
VI PEKERJAAN PENGECATAN
VII PEKERJAAN LAIN-LAIN
VIII ARSITEKTUR FASADE BANGUNAN
Sub Jumlah Pekerjaan Arsitektur
D PEKERJAAN MEKANIKAL ELEKTRIKAL
01 INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 1 & 2
02 INSTALASI TATA UDARA / AC LANTAI 1 & 2
03 INSTALASI TELEPHONE LANTAI 1 & 2
04 INSTALASI FIRE ALARM LANTAI 1 & 2
05 INSTALASI KABEL DATA KOMPUTER LANTAI 1 & 2
06 INSTALASI CCTV LANTAI 1 & 2
07 AIR BEKAS, KOTOR DAN VENT LANTAI 1 & 2

Rekapitulasi RAB_Gedung Radiologi dan Laboratorium 229


NO. URAIAN PEKERJAAN

1 2
08 AIR BERSIH LANTAI 1 & 2
09 PENANGGULANGAN KEBAKARAN

Rekapitulasi RAB_Gedung Radiologi dan Laboratorium 230


NO. URAIAN PEKERJAAN

1 2
10 SALURAN AIR HUJAN
11 DUMBWAITER
Sub Jumlah Pekerjaan Mekanikal Elektrikal

JUMLAH TOTAL
PPN 10 %
JUMLAH TOTAL + PPN 10 %
DIBULATKAN
Empat Belas Milyar Lima Ratus Lima Puluh Empat Juta Sembilan Pul
TERBILANG :
Rupiah

Ketapang, Desember 201


Diperiksa Oleh : Dibuat Oleh :
Pejabat Pelaksana Teknis Kegiatan Konsultan Perencana
(PPTK) CV. PLATINUM

RATIH SUMARNI, ST. YA' WAHYUDI, ST.


NIP. 19830805 201001 2 008 Direktur

Disetujui Oleh : Mengetahui Oleh :


Pejabat Pembuat Komitmen Kepala RSUD Dokter Agoesd
(PPK) Kabupaten Ketapang

WIDIYATMOKO, S.Si. dr. RUSDY EFFENDY


NIP. 19801009 200212 1006 NIP. 19631216 199103 1 00

Rekapitulasi RAB_Gedung Radiologi dan Laboratorium 231


ULASI RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
NGUNAN GEDUNG RADIOLOGI DAN LABORATORIUM
H SAKIT UMUM DAERAH DR. AGOESDJAM
YJEND D.I. PANJAITAN NO. 51 KABUPATEN KETAPANG

JUMLAH SUB TOTAL

75,994,910.20
1,731,424,937.46
2,111,625,166.59
925,832,017.93
73,253,468.56
389,478,228.92
5,307,608,729.66

2,881,494.00
144,571,456.74
262,891,251.51
71,649,052.44
45,449,587.11
527,442,841.80

1,257,348,243.80
841,965,162.65
508,354,768.55
1,400,507,331.49
157,240,838.75
212,452,595.42
41,239,438.26
237,428,996.55
4,656,537,375.48

1,216,349,176.27
560,639,724.50
29,151,450.00
62,213,140.00
17,543,848.00
29,415,400.00
162,046,183.00

Rekapitulasi RAB_Gedung Radiologi dan Laboratorium 232


JUMLAH SUB TOTAL

3
566,905,015.20
11,184,000.00

Rekapitulasi RAB_Gedung Radiologi dan Laboratorium 233


JUMLAH SUB TOTAL

3
51,208,165.00
162,300,000.00
2,868,956,101.97

13,360,545,048.90
1,336,054,504.89
14,696,599,553.79
14,696,599,000.00
Belas Milyar Lima Ratus Lima Puluh Empat Juta Sembilan Puluh Empat Ribu

Ketapang, Desember 2018


Dibuat Oleh :
Konsultan Perencana
CV. PLATINUM

YA' WAHYUDI, ST.


Direktur

Mengetahui Oleh :
Kepala RSUD Dokter Agoesdjam
Kabupaten Ketapang

dr. RUSDY EFFENDY


NIP. 19631216 199103 1 008

Rekapitulasi RAB_Gedung Radiologi dan Laboratorium 234


DAFTAR HARGA DASAR SATUAN BAHAN TAHUN ANGGARAN 2018
KECAMATAN DELTA PAWAN

UPAH TENAGA
Keuntungan & Jasa
NO. TENAGA KERJA KODE KERJALainnya(13.5%)
( Rp/Hari )( Rp/Hari )
1 Pekerja tak terlatih 75,600.00
###
2 Tukang ###
99,750.00
3 Kepala tukang ###
99,750.00
4 Mandor ###
99,750.00
###
###
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

PEKERJAAN : PEMBANGUNAN GEDUNG RADIOLOGI DAN LABORATORIUM


DINAS / INSTANSI : RUMAH SAKIT UMUM DAERAH DR. AGOESDJAM
LOKASI : JL. MAYJEND D.I. PANJAITAN NO. 51 KABUPATEN KETAPANG
TAHUN ANGGARAN : 2018

KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
A PEKERJAAN STRUKTUR GEDUNG
I PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank 2.2.1.4.a 128.00 M'
2 Pembongkaran 1.00 Lsm
3 Pagar Sementara 2.2.1.2.a 171.40 M'
4 Papan Nama Proyek 1.00 Lsm
Sub Jumlah I
II PEKERJAAN PONDASI
1 Pengadaan Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 597.00 Btg
450 -6 m
2 Pemancangan Mini Pile 25 x 25 K450 3,582.00 M'
3 Pembobokan Mini Pile 199.00 Titik
4 Galian Tanah Pondasi 2.3.1.1 104.79 M³
5 Urugan Pasir t = 10 cm 2.3.1.11 12.33 M³
6 Lantai Kerja t = 5 cm 4.1.1.4 6.16 M³
7 Poer Type P2
- Beton Ready Mix K-300 B. 13.i.2 3.47 M³
- Tulangan U32 4.1.1.17.b 296.34 Kg
- Bekisting Pondasi 4.1.1.20.a 13.16 M²
8 Poer Type P3
- Beton Ready Mix K-300 B. 13.i.2 3.14 M³
- Tulangan U32 4.1.1.17.b 211.65 Kg
- Bekisting Pondasi 4.1.1.20.a 7.98 M²
9 Poer Type P4
- Beton Ready Mix K-300 B. 13.i.2 16.82 M³
- Tulangan U32 4.1.1.17.b 1,574.46 Kg
- Bekisting Pondasi 4.1.1.20.a 43.40 M²
10 Poer Type P6
- Beton Ready Mix K-300 B. 13.i.2 4.99 M³
- Tulangan U32 4.1.1.17.b 326.04 Kg
- Bekisting Pondasi 4.1.1.20.a 10.78 M²

RAB_Gedung Radiologi dan Laboratorium 236


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
11 Poer Type P7
- Beton Ready Mix K-300 B. 13.i.2 14.81 M³
- Tulangan U32 4.1.1.17.b 892.79 Kg
- Bekisting Pondasi 4.1.1.20.a 25.76 M²
12 Poer Type P9
- Beton Ready Mix K-300 B. 13.i.2 18.52 M³
- Tulangan U32 4.1.1.17.b 1,115.98 Kg
- Bekisting Pondasi 4.1.1.20.a 32.20 M²
13 Poer Type P12
- Beton Ready Mix K-300 B. 13.i.2 24.55 M³
- Tulangan U32 4.1.1.17.b 1,416.86 Kg
- Bekisting Pondasi 4.1.1.20.a 37.45 M²
14 Kolom Pondasi K1 Uk. 45x45 cm
- Beton Ready Mix K-225 B. 13.f.2 4.25 M³
- Tulangan U32 4.1.1.17.b 1,722.01 Kg
- Tulangan U24 4.1.1.17.a 167.82 Kg
- Bekisting Pondasi 4.1.1.20.a 37.80 M²
Sub Jumlah II
III PEKERJAAN STRUKTUR
Struktur Lantai 1
1 Sloof Uk. 35x60 cm
- Beton Ready Mix K-225 B. 13.f.2 51.44 M³
- Tulangan U32 4.1.1.17.b 10,291.28 Kg
- Tulangan U24 4.1.1.17.a 2,056.54 Kg
- Bekisting Sloof 4.1.1.21.a 396.83 M²

RAB_Gedung Radiologi dan Laboratorium 237


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
2 Sloof Uk. 25x50 cm
- Beton Ready Mix K-225 B. 13.f.2 18.30 M³
- Tulangan U32 4.1.1.17.b 2,342.60 Kg
- Tulangan U24 4.1.1.17.a 626.81 Kg
- Bekisting Sloof 4.1.1.21.a 192.10 M²
3 Sloof Uk. 20x40 cm
- Beton Ready Mix K-225 B. 13.f.2 2.05 M³
- Tulangan U32 4.1.1.17.b 298.75 Kg
- Tulangan U24 4.1.1.17.a 90.56 Kg
- Bekisting Sloof 4.1.1.21.a 27.39 M²
4 Sloof Uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.54 M³
- Tulangan U32 4.1.1.17.b 76.42 Kg
- Tulangan U24 4.1.1.17.a 29.03 Kg
- Bekisting Sloof 4.1.1.21.a 9.08 M²
5 Tutup Kolong Uk.10x30 cm (blk.35/60)
- Beton Ready Mix K-225 B. 13.f.2 3.46 M³
- Wiremesh M6 4.1.1.19 192.49 Kg
- Bekisting Sloof 4.1.1.21.a 69.24 M²
- Plesteran Tutup Kolong Uk.10x30 cm (blk.35/60) 4.4.2.4 49.40 M²
6 Tutup Kolong Uk.10/50 (blk.20/40)
- Beton Ready Mix K-225 B. 13.f.2 0.36 M³
- Wiremesh M6 4.1.1.19 18.14 Kg
- Bekisting Sloof 4.1.1.21.a 7.25 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 4.89 M²
7 Kolom K1 Uk. 45x45 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 20.66 M³
- Tulangan U32 4.1.1.17.b 3,612.60 Kg
- Tulangan U24 4.1.1.17.a 700.91 Kg
- Bekisting Kolom 4.1.1.22 b 183.60 M²
8 Kolom K2 Uk. 30x30 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 0.65 M³
- Tulangan U32 4.1.1.17.b 113.69 Kg
- Tulangan U24 4.1.1.17.a 19.75 Kg
- Bekisting Kolom 4.1.1.22 b 8.64 M²
9 Kolom Praktis Uk.9x9 cm Lt.1
- Beton K175 4.1.1.4 6.33 M³
- Tulangan U24 4.1.1.17.a 1,577.16 Kg
- Bekisting 4.1.1.20.a 70.31 M²
10 Balok Praktis Uk.9x9 cm Lt.1 (dinding)
- Beton K175 4.1.1.4 0.47 M³

RAB_Gedung Radiologi dan Laboratorium 238


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Tulangan U24 4.1.1.17.a 115.98 Kg
- Bekisting 4.1.1.20.a 5.21 M²
Struktur Lantai 1
Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.110
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.36 M³
- Tulangan U32 4.1.1.17.b 726.66 Kg
- Tulangan U24 4.1.1.17.a 251.69 Kg
- Bekisting Balok 4.1.1.23.b 79.54 M²
2 List Plat Dack elv. 3.110
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 12.57 M³
- Wiremesh 2xM7 4.1.1.19 710.07 Kg
- Bekisting Lantai 4.1.1.24.b 146.98 M²
- Plesteran List Plat Dack elv. 3.110 4.4.2.4 262.03 M²
3 Balok Uk. 35x60 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 51.08 M³
- Tulangan U32 4.1.1.17.b 10,291.28 Kg
- Tulangan U24 4.1.1.17.a 2,042.21 Kg
- Bekisting Balok 4.1.1.23.b 394.07 M²
4 Balok Uk. 25x50 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 17.50 M³
- Tulangan U32 4.1.1.17.b 2,241.55 Kg
- Tulangan U24 4.1.1.17.a 599.43 Kg
- Bekisting Balok 4.1.1.23.b 183.70 M²

RAB_Gedung Radiologi dan Laboratorium 239


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
5 Balok Uk. 20x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 2.53 M³
- Tulangan U32 4.1.1.17.b 361.24 Kg
- Tulangan U24 4.1.1.17.a 111.40 Kg
- Bekisting Balok 4.1.1.23.b 33.72 M²
6 Balok Uk. 15x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.54 M³
- Tulangan U32 4.1.1.17.b 75.79 Kg
- Tulangan U24 4.1.1.17.a 28.80 Kg
- Bekisting Balok 4.1.1.23.b 9.00 M²
7 Kolom K1 Uk. 45x45 cm (elv.4.00-8.00) Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 20.96 M³
- Tulangan U32 4.1.1.17.b 3,211.20 Kg
- Tulangan U24 4.1.1.17.a 710.78 Kg
- Bekisting Kolom 4.1.1.22 b 186.30 M²
8 Kolom K2 Uk. 30x30 cm (elv.4.00-8.00) Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.65 M³
- Tulangan U32 4.1.1.17.b 113.69 Kg
- Tulangan U24 4.1.1.17.a 19.75 Kg
- Bekisting Kolom 4.1.1.22 b 8.64 M²
9 Kolom Praktis Uk.9x9 cm Lt.2
- Beton K175 4.1.1.4 4.96 M³
- Tulangan U24 4.1.1.17.a 1,235.56 Kg
- Bekisting 4.1.1.20.a 55.08 M²
10 Balok Praktis Uk.9x9 cm Lt.2
- Beton K175 4.1.1.4 0.70 M³
- Tulangan U24 4.1.1.17.a 172.14 Kg
- Bekisting 4.1.1.20.a 7.74 M²
elv.4.500
11 Balok Uk. 15x40 cm elv.4.5
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.53 M³
- Tulangan U32 4.1.1.17.b 510.96 Kg
- Tulangan U24 4.1.1.17.a 179.29 Kg
- Bekisting Balok 4.1.1.23.b 56.63 M²
12 Kolom Praktis Uk.9x9 cm elv.4.5
- Beton K175 4.1.1.4 0.31 M³
- Tulangan U24 4.1.1.17.a 79.88 Kg
- Bekisting 4.1.1.20.a 6.91 M²
13 List Plat Dack elv. 4.5
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.44 M³
- Wiremesh 2xM7 4.1.1.19 397.22 Kg

RAB_Gedung Radiologi dan Laboratorium 240


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Bekisting Lantai 4.1.1.24.b 57.35 M²
- Plesteran List Plat Dack elv. 4.5 4.4.2.4 101.28 M²
elv.7.20
19 List Dack elv.7.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.12 M³
- Wiremesh 2xM7 4.1.1.19 547.71 Kg
- Bekisting Lantai 4.1.1.24.b 70.71 M²
- Plesteran List Dack elv. 7.20 4.4.2.4 79.07 M²
20 Balok List dack Uk.15x40 elv.7.20
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.93 M³
- Tulangan U32 4.1.1.17.b 564.33 Kg
- Tulangan U24 4.1.1.17.a 195.05 Kg
- Bekisting Balok 4.1.1.23.b 78.04 M²
Elv.7.60
21 Balok uk. 20x80 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 5.13 M³
- Tulangan U32 4.1.1.17.b 745.75 Kg
- Tulangan U24 4.1.1.17.a 156.22 Kg
- Bekisting Balok 4.1.1.23.b 36.66 M²
22 Balok uk. 25x55 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.38 M³
- Tulangan U32 4.1.1.17.b 471.81 Kg
- Tulangan U24 4.1.1.17.a 116.05 Kg
- Bekisting Balok 4.1.1.23.b 35.44 M²

RAB_Gedung Radiologi dan Laboratorium 241


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
23 Balok uk. 20x45 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.54 M³
- Tulangan U32 4.1.1.17.b 162.48 Kg
- Tulangan U24 4.1.1.17.a 44.90 Kg
- Bekisting Balok 4.1.1.23.b 16.12 M²
24 Balok uk. 20x40 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 2.71 M³
- Tulangan U32 4.1.1.17.b 299.22 Kg
- Tulangan U24 4.1.1.17.a 89.53 Kg
- Bekisting Balok 4.1.1.23.b 33.85 M²
25 Plat Dack elv. 7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.86 M³
- Wiremesh 2xM7 4.1.1.19 405.24 Kg
- Bekisting Lantai 4.1.1.24.b 22.21 M²
- Plesteran Plat Dack elv. 7.60 4.4.2.4 22.21 M²
- Acian Plat Dack elv. 7.60 4.4.2.27 22.21 M²
- Waterproofing Plat Dack elv. 7.60 A.4.7.1.10.f 22.21 M²
Elv.8.00
26 Balok uk. 25x55 cm Elv.8.00
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 26.50 M³
- Tulangan U32 4.1.1.17.b 3,518.01 Kg
- Tulangan U24 4.1.1.17.a 907.70 Kg
- Bekisting Balok 4.1.1.23.b 278.25 M²
27 Kolom K4 Uk. 15x15 cm el,8.00
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.16 M³
- Tulangan U32 4.1.1.17.b 60.02 Kg
- Tulangan U24 4.1.1.17.a 8.22 Kg
- Bekisting Kolom 4.1.1.22 b 2.16 M²
28 Kolom Praktis Uk.9x9 cm elv.8.00
- Beton K175 4.1.1.4 0.04 M³
- Tulangan U24 4.1.1.17.a 9.99 Kg
- Bekisting 4.1.1.20.a 0.86 M²
29 Balok Praktis Uk.9x9 cm elv.8.00
- Beton K175 4.1.1.4 1.85 M³
- Tulangan U24 4.1.1.17.a 41.04 Kg
- Bekisting 4.1.1.20.a 20.50 M²
Elv.9.80
30 Balok uk. 20x40 cm Elv.9.80
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.20 M³
- Tulangan U32 4.1.1.17.b 132.64 Kg
- Tulangan U24 4.1.1.17.a 39.90 Kg

RAB_Gedung Radiologi dan Laboratorium 242


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Bekisting Balok 4.1.1.23.b 15.00 M²
31 Plat Dack elv. 9.80
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.66 M³
- Wiremesh 2xM7 4.1.1.19 138.78 Kg
- Bekisting Lantai 4.1.1.24.b 13.64 M²
- Plesteran Plat Dack 4.4.2.4 13.64 M²
- Acian Plat Dack 4.4.2.27 13.64 M²
- Waterproofing Plat Dack A.4.7.1.10.f 13.64 M²
Struktur Lantai 2
Sub Jumlah III
IV PEKERJAAN PLAT LANTAI
1 Plat Lantai 1
- Beton Ready Mix K-225 t =12 cm B. 13.f.2 107.63 M³
- Wiremesh 2xM7 4.1.1.19 7,480.15 Kg
- Bekisting Lantai 4.1.1.24.c 721.82 M²
2 Plat Lantai 2
- Beton Ready Mix K-225 t =12 cm menggunakan pompa B. 13.f.1 103.90 M³
- Wiremesh 2xM7 4.1.1.19 7,221.06 Kg
- Bekisting Lantai 4.1.1.24.b 709.70 M²
Sub Jumlah IV

RAB_Gedung Radiologi dan Laboratorium 243


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
V PEKERJAAN TANGGA
Tangga Type T1 (2 Unit)
1 Balok Bordes uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.31 M³
- Tulangan U32 4.1.1.17.b 50.53 Kg
- Tulangan U24 4.1.1.17.a 19.67 Kg
- Bekisting Balok 4.1.1.23.b 6.48 M²
- Plesteran Balok Bordes 15/40 4.4.2.4 6.48 M²
2 Plat Bordes
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 1.31 M³
- Tulangan U24 4.1.1.17.a 173.55 Kg
- Bekisting Balok 4.1.1.23.b 6.62 M²
- Plesteran Bawah Bordes 15/40 4.4.2.4 6.62 M²
3 Plat Tangga
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 3.20 M³
- Tulangan U24 4.1.1.17.a 612.01 Kg
- Bekisting Plat 4.1.1.24.b 22.89 M²
- Plesteran Bawah Plat tangga 15/40 4.4.2.4 22.89 M²
4 Anak Tangga
- Beton Ready Mix K-225 B. 13.f.2 1.73 M³
- Wiremesh M6 4.1.1.19 345.28 Kg
- Bekisting 4.1.1.21.a 11.52 M²
Tangga Type T2 (1 Unit)
1 Balok Bordes uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.16 M³
- Tulangan U32 4.1.1.17.b 25.26 Kg
- Tulangan U24 4.1.1.17.a 9.84 Kg
- Bekisting Balok 4.1.1.23.b 3.24 M²
- Plesteran Balok Bordes 15/40 4.4.2.4 3.24 M²
2 Plat Bordes
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³
- Tulangan U24 4.1.1.17.a 86.78 Kg
- Bekisting Balok 4.1.1.23.b 6.40 M²
- Plesteran Bawah Bordes 15/40 4.4.2.4 6.40 M²
3 Plat Tangga
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 2.07 M³
- Tulangan U24 4.1.1.17.a 394.96 Kg
- Bekisting Plat 4.1.1.24.b 29.60 M²
- Plesteran Bawah Plat tangga 15/40 4.4.2.4 29.60 M²
4 Anak Tangga
- Beton Ready Mix K-225 B. 13.f.2 1.12 M³

RAB_Gedung Radiologi dan Laboratorium 244


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Wiremesh M6 4.1.1.19 223.28 Kg
- Bekisting 4.1.1.21.a 7.45 M²
Sub Jumlah V
VI PEKERJAAN ATAP
1 Rangka Atap Baja Ringan Zincallume 8.1.1.3. 905.04 M2
2 Atap Zincallume Color t =0,35 mm A.4.5.2.41.b 905.04 M2
3 Prabung Atap Zincallume A.4.5.2.42.a 64.20 M
4 List Plank Woodplak 2 lps 8.1.1.4. 125.20 M
Sub Jumlah VI
JUMLAH TOTAL PEKERJAAN STRUKTUR
B PEKERJAAN STRUKTUR SELASAR
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Bowplank 2.2.1.4.a 44.00 M'
Sub Jumlah I
II PEKERJAAN PONDASI
1 Pengadaan Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 48.00 Btg
450 -6 m
2 Pemancangan Mini Pile 25 x 25 K450 288.00 M'
3 Pembobokan Mini Pile 16.00 Titik
4 Galian Tanah Pondasi 2.3.1.1 6.66 M³
5 Urugan Pasir t = 10 cm 2.3.1.11 0.78 M³
6 Lantai Kerja t = 5 cm 4.1.1.4 0.39 M³
7 Poer Type P1
- Beton Ready Mix K-300 B. 13.i.2 2.02 M³
- Tulangan U32 4.1.1.17.b 219.65 Kg
- Bekisting Pondasi 4.1.1.20.a 13.44 M²

RAB_Gedung Radiologi dan Laboratorium 245


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
8 Poer Type P2
- Beton Ready Mix K-300 B.13.i.2 3.47 M³
- Tulangan U32 4.1.1.17.b 296.34 Kg
- Bekisting Pondasi 4.1.1.20.a 13.16 M²
9 Kolom Pondasi K2 Uk. 30x30 cm
- Beton Ready Mix K-225 B. 13.f.2 0.76 M³
- Tulangan U32 4.1.1.17.b 325.15 Kg
- Tulangan U24 4.1.1.17.a 42.98 Kg
- Bekisting Pondasi 4.1.1.20.a 10.08 M²
Sub Jumlah II
III PEKERJAAN STRUKTUR
Struktur Lantai 1
1 Sloof Uk. 20x40 cm
- Beton Ready Mix K-225 B. 13.f.2 3.48 M³
- Tulangan U32 4.1.1.17.b 486.73 Kg
- Tulangan U24 4.1.1.17.a 153.26 Kg
- Bekisting Sloof 4.1.1.21.a 46.44 M²
2 Tutup Kolong Uk.10/50 (blk.20/40)
- Beton Ready Mix K-225 B. 13.f.2 1.88 M³
- Wiremesh M6 4.1.1.19 94.14 Kg
- Bekisting Sloof 4.1.1.21.a 37.63 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 24.20 M²
3 Kolom K2 Uk. 30x30 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 3.89 M³
- Tulangan U32 4.1.1.17.b 682.13 Kg
- Tulangan U24 4.1.1.17.a 118.50 Kg
- Bekisting Kolom 4.1.1.22 b 51.84 M²
Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.20
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 2.33 M³
- Tulangan U32 4.1.1.17.b 268.11 Kg
- Tulangan U24 4.1.1.17.a 92.43 Kg
- Bekisting Balok 4.1.1.23.b 29.14 M²
2 List Plat Dack elv. 3.3.20
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.64 M³
- Wiremesh 2xM7 4.1.1.19 260.71 Kg
- Bekisting Lantai 4.1.1.24.b 54.17 M²
- Plesteran List Plat Dack elv. 3.20 4.4.2.4 96.62 M²
3 Balok Uk. 20x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.59 M³
- Tulangan U32 4.1.1.17.b 508.04 Kg

RAB_Gedung Radiologi dan Laboratorium 246


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Tulangan U24 4.1.1.17.a 158.00 Kg
- Bekisting Balok 4.1.1.23.b 47.88 M²
4 Kolom K2 Uk. 30x30 cm (elv.4.00-7.95) Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.27 M³
- Tulangan U32 4.1.1.17.b 682.13 Kg
- Tulangan U24 4.1.1.17.a 129.56 Kg
- Bekisting Kolom 4.1.1.22 b 56.88 M²
elv.7.95
5 Balok Uk. 20x45 elv.7.95
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.60 M³
- Tulangan U32 4.1.1.17.b 62.53 Kg
- Tulangan U24 4.1.1.17.a 17.81 Kg
- Bekisting Balok 4.1.1.23.b 6.30 M²
6 Balok Uk. 20x40 elv.7.95
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.32 M³
- Tulangan U32 4.1.1.17.b 459.49 Kg
- Tulangan U24 4.1.1.17.a 146.28 Kg
- Bekisting Balok 4.1.1.23.b 44.32 M²
7 Plat Dack elv.7.95
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.34 M³
- Wiremesh 2xM7 4.1.1.19 528.76 Kg
- Bekisting Lantai 4.1.1.24.b 52.32 M²
- Plesteran Plat Dack 4.4.2.4 126.80 M²
- Acian Plat Dack 4.4.2.27 63.40 M²
- Waterproofing Plat Dack A.4.7.1.10.f 63.40 M²
Sub Jumlah III

RAB_Gedung Radiologi dan Laboratorium 247


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
IV PEKERJAAN PLAT LANTAI
1 Plat Lantai 1
- Beton Ready Mix K-225 t = 10 cm B. 13.f.2 7.22 M³
- Wiremesh 2xM7 4.1.1.19 602.15 Kg
- Bekisting Lantai 4.1.1.24.c 60.57 M²
2 Plat Lantai 2
- Beton Ready Mix K-225 t = 10 cm menggunakan pompa B. 13.f.1 7.22 M³
- Wiremesh 2xM7 4.1.1.19 602.15 Kg
- Bekisting Lantai 4.1.1.24.b 60.23 M²
Sub Jumlah IV
V PEKERJAAN ATAP
1 Rangka Atap Baja Ringan Zincallume 8.1.1.3. 90.54 M2
2 Atap Zincallume Color t =0,35 mm A.4.5.2.41.b 90.54 M2
3 Prabung Atap Zincallume A.4.5.2.42.a 21.46 M
4 List Plank Woodplak 2 lps 8.1.1.4. 42.80 M
Sub Jumlah V
JUMLAH TOTAL PEKERJAAN STRUKTUR SELASAR
C PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
A Lantai 1
1 Pas. Dinding Batako A.4.4.1.19.a 1,437.95 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 2,833.10 m2
3 Pas. Dinding Keramik 20x40 Cm A.4.4.3.54.a 144.25 m2
4 Pas. Dinding Wastafel Keramik 30x30 Motif A.4.4.3.35.a 1.81 m2
5 Pas. Timbal Pelapis (PB) 2 mm Dinding + Partisi Triplek A.X-Ray 251.32 m2

B Lantai 2
1 Pas. Dinding Batako A.4.4.1.19.a 1,046.98 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 2,060.27 m2
3 Pas. Dinding Keramik 20x40 Cm A.4.4.3.54.a 83.98 m2
4 Pas. Dinding Wastafel Keramik 30x30 Motif A.4.4.3.35.a 113.46 m2

C Lantai Atap
1 Pas. Dinding Batako A.4.4.1.19.a 42.20 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 84.41 m2

D Koridor
1 Pas. Dinding Batako A.4.4.1.19.a 259.96 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 519.92 m2
Sub Jumlah I
II PEKERJAAN LANTAI

RAB_Gedung Radiologi dan Laboratorium 248


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
A Lantai 1
1 Pas. Lantai Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 131.14 m2
2 Pas. Lantai Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 27.36 m2
3 Pas. Lantai Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 494.45 m2
4 Pas. Lantai Keramik 30x30 Cm Polised A.4.4.3.35. 44.29 m2
5 Pas. Lantai Keramik 30x30 Cm Unpolised A.4.4.3.35.a 27.00 m2
6 Pas. Lantai Vinyl Homogeneous Heavy Duty A.4.4.3.59.a 175.94 m2
7 Pas. Lantai Tangga
a. Pas. Lantai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 42.39 m2
b. Stepnosing A.4.4.3.41 81.12 m'
8 Pas. Hospital Plint A.4.4.3.21 623.30 m'

B Lantai 2
1 Pas. Lantai Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 103.79 m2
2 Pas. Lantai Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 17.28 m2
3 Pas. Lantai Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 589.50 m2
4 Pas. Lantai Keramik 30x30 Cm Polised A.4.4.3.35 53.17 m2
5 Pas. Lantai Keramik 30x30 Cm Unpolised A.4.4.3.35.a 25.92 m2
6 Pas. Lantai Vinyl Homogeneous Heavy Duty A.4.4.3.59.a 71.04 m2
7 Pas. Lantai Tangga
a. Pas. Lantai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 18.05 m2
b. Stepnosing A.4.4.3.41 34.56 m'
8 Pas. Hospital Plint A.4.4.3.21 513.51 m'
Sub Jumlah II

RAB_Gedung Radiologi dan Laboratorium 249


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
III PEKERJAAN PLAFON
A Lantai 1
1 Pas. Plafond Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 674.60 m2
2 Pas. Plafond GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 26.18 m2
3 Pas. Plafond Timbal Pelapis (PB) 2 mm + Partisi Gypsum A.X-Ray 115.12 m2

B Lantai 2
1 Pas. Plafond Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 846.05 m2
2 Pas. Plafond GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 26.96 m2
Sub Jumlah III
IV PEKERJAAN PINTU DAN JENDELA
A Lantai 1
Pintu :
1 PU1 234x250 cm (Kaca Tempered Frameless 12mm) U&B 2.00 Unit
- Pas. ACP Gawang U&B 65.41 m2

2 PD1 167,5x270 cm (Kaca Tempered Frameless 12mm) U&B 2.00 Unit

3 PD2 167,5x270 cm 2.00 Unit


- Kusen A.4.2.1.11 18.50 m'
- Daun Pintu A.4.6.1.8.a 7.05 m2
- Engsel Pintu A.4.6.2.5 16.00 Set
- Pull Handle A.4.6.2.11.a 4.00 Set
- Kunci lockcase A.4.6.2.1.a 2.00 Set
- Door Stoper A.4.6.2.13 4.00 Set
- Door Closer A.4.6.2.10 4.00 Set
- Kaca 5 mm A.4.6.2.17 1.92 m2

4 P1 97,5x270 cm 4.00 Unit


- Kusen A.4.2.1.11 29.40 m'
- Daun Pintu A.4.6.1.8.a 7.94 m2
- Engsel Pintu A.4.6.2.5 16.00 Set
- Lever Handle A.4.6.2.11.a 4.00 Set
- Kunci lockcase A.4.6.2.1.a 4.00 Set
- Door Stoper A.4.6.2.13 4.00 Set
- Door Closer A.4.6.2.10 4.00 Set
- Kaca 5 mm A.4.6.2.17 2.43 m2

5 P2 87,5x270 cm 18.00 Unit


- Kusen A.4.2.1.11 128.70 m'
- Daun Pintu A.4.6.1.8.a 34.65 m2

RAB_Gedung Radiologi dan Laboratorium 250


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Engsel Pintu A.4.6.2.5 72.00 Set
- Lever Handle A.4.6.2.11.a 18.00 Set
- Kunci lockcase A.4.6.2.1.a 18.00 Set
- Door Stoper A.4.6.2.13 18.00 Set
- Door Closer A.4.6.2.10 18.00 Set
- Kaca 5 mm A.4.6.2.17 7.20 m2

6 P3 77,5x220 cm 1.00 Unit


- Kusen A.4.2.1.11 5.17 m'
- Daun Pintu A.4.6.1.8.a 1.70 m2
- Engsel Pintu A.4.6.2.5 4.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set
- Door Closer A.4.6.2.10 1.00 Set

7 P4 107,5x270 cm 1.00 Unit


- Kusen A.4.2.1.11 7.55 m'
- Daun Pintu A.4.6.1.8.a 2.20 m2
- Engsel Pintu A.4.6.2.5 4.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set
- Door Closer A.4.6.2.10 1.00 Set
- Kaca 5 mm A.4.6.2.17 0.66 m2

RAB_Gedung Radiologi dan Laboratorium 251


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
8 P5 107,5x270 cm 1.00 Unit
- Kusen A.4.2.1.11 7.55 m'
- Daun Pintu A.4.6.1.8.a 1.85 m2
- Engsel Pintu A.4.6.2.5 4.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set
- Door Closer A.4.6.2.10 1.00 Set
- Kaca 5 mm A.4.6.2.17 0.51 m2

9 P6 77,5x180 cm 1.00 Unit


- Kusen A.4.2.1.11 4.37 m'
- Daun Pintu A.4.6.1.8.a 1.23 m2
- Engsel Pintu A.4.6.2.5 4.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set
- Door Closer A.4.6.2.10 1.00 Set
- Kaca 5 mm A.4.6.2.17 0.16 m2

11 PS1 44x100 cm 2.00 Unit


- Kusen A.4.2.1.11 5.76 m'
- Daun Pintu A.4.6.1.8.a 0.88 m2
- Engsel Kupu-Kupu A.4.6.2.6 4.00 Set
- Handle : Pull Plate A.4.6.2.11.b 2.00 Set
- Kunci Pintu Window bolt with key A.4.6.2.4.a 2.00 Set

12 PT1 80x220 cm 4.00 Unit


- Kusen A.4.2.1.11 20.80 m'
- Daun Pintu A.4.6.1.8.a 6.47 m2
- Engsel Pintu A.4.6.2.5 12.00 Set
- Lever Handle A.4.6.2.11.a 4.00 Set
- Kunci lockcase A.4.6.2.1.a 4.00 Set
- Door Stoper A.4.6.2.13 4.00 Set

13 PT2 70x220 cm 1.00 Unit


- Kusen A.4.2.1.11 5.10 m'
- Daun Pintu A.4.6.1.8.a 1.42 m2
- Engsel Pintu A.4.6.2.5 3.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set

RAB_Gedung Radiologi dan Laboratorium 252


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Door Stoper A.4.6.2.13 1.00 Set

14 PT3 90x220 cm 2.00 Unit


- Kusen A.4.2.1.11 10.60 m'
- Daun Pintu A.4.6.1.8.a 3.58 m2
- Engsel Pintu A.4.6.2.5 6.00 Set
- Lever Handle A.4.6.2.11.a 2.00 Set
- Kunci lockcase A.4.6.2.1.a 2.00 Set
- Door Stoper A.4.6.2.13 2.00 Set

15 PT4 90x180 cm 1.00 Unit


- Kusen A.4.2.1.11 4.50 m'
- Daun Pintu A.4.6.1.8.a 1.43 m2
- Engsel Pintu A.4.6.2.5 3.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set

16 PR1 160x220 cm (Lapis Timbal 2mm) 3.00 Unit

17 PR2 100x220 cm (Lapis Timbal 2mm) 2.00 Unit

18 PR3 160x220 cm (Lapis Timbal 2mm + Sangkar Faraday) 1.00 Unit

19 PR4 800x220 cm (Lapis Timbal 2mm) 4.00 Unit

RAB_Gedung Radiologi dan Laboratorium 253


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
Jendela :
1 J1 360x220 cm 9.00 Unit
- Kusen A.4.2.1.11 228.60 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 15.78 m2
- Kaca 5 mm A.4.6.2.17 50.73 m2
- Casement Handle A.4.6.2.11.b 18.00 Set
- Friction Stay A.4.6.2.9 36.00 Set

2 J2 240x220 cm 5.00 Unit


- Kusen A.4.2.1.11 92.00 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 3.87 m2
- Kaca 5 mm A.4.6.2.17 20.71 m2
- Casement Handle A.4.6.2.11.b 5.00 Set
- Friction Stay A.4.6.2.9 10.00 Set

3 J2A 240x270 cm 2.00 Unit


- Kusen A.4.2.1.11 40.80 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 1.55 m2
- Kaca 5 mm A.4.6.2.17 10.60 m2
- Casement Handle A.4.6.2.11.b 2.00 Set
- Friction Stay A.4.6.2.9 4.00 Set

4 J3 210x220 cm 3.00 Unit


- Kusen A.4.2.1.11 51.60 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 2.01 m2
- Kaca 5 mm A.4.6.2.17 10.82 m2
- Casement Handle A.4.6.2.11.b 3.00 Set
- Friction Stay A.4.6.2.9 6.00 Set

5 J4 174x220 cm 2.00 Unit


- Kusen A.4.2.1.11 27.12 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 1.65 m2
- Kaca 5 mm A.4.6.2.17 5.45 m2
- Casement Handle A.4.6.2.11.b 2.00 Set
- Friction Stay A.4.6.2.9 4.00 Set

6 J5 140x220 cm 1.00 Unit


- Kusen A.4.2.1.11 12.20 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 0.65 m2
- Kaca 5 mm A.4.6.2.17 2.17 m2
- Casement Handle A.4.6.2.11.b 1.00 Set

RAB_Gedung Radiologi dan Laboratorium 254


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Friction Stay A.4.6.2.9 2.00 Set

7 J6 124x220 cm 3.00 Unit


- Kusen A.4.2.1.11 34.68 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 1.71 m2
- Kaca 5 mm A.4.6.2.17 5.73 m2
- Casement Handle A.4.6.2.11.b 3.00 Set
- Friction Stay A.4.6.2.9 6.00 Set

8 JL 338x170 cm 1.00 Unit


- Kusen A.4.2.1.11 20.32 m'
- Kaca 5 mm A.4.6.2.17 4.35 m2

9 JR1 120x70 cm (Anti Radiasi) A.RAD.05 1.00 Unit

10 JR2 120x70 cm (Anti Radiasi) A.RAD.05 3.00 Unit

11 V1 70x54 cm 3.00 Unit


- Kusen A.4.2.1.11 7.44 m'
- Kaca 5 mm A.4.6.2.17 1.18 m2

11 V2 140x54 cm 12.00 Unit


- Kusen A.4.2.1.11 53.04 m'
- Kaca 5 mm A.4.6.2.17 9.64 m2

RAB_Gedung Radiologi dan Laboratorium 255


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
B Lantai 2
Pintu :
1 PD1 167,5x270 cm (Kaca Tempered Frameless 12mm) U&B 4.00 Unit

2 PD2 167,5x270 cm 10.00 Unit


- Kusen A.4.2.1.11 92.50 m'
- Daun Pintu A.4.6.1.8.a 35.25 m2
- Engsel Pintu A.4.6.2.5 80.00 Set
- Pull Handle A.4.6.2.11.a 20.00 Set
- Kunci lockcase A.4.6.2.1.a 10.00 Set
- Door Stoper A.4.6.2.13 20.00 Set
- Door Closer A.4.6.2.10 20.00 Set
- Kaca 5 mm A.4.6.2.17 9.60 m2

3 P1 97,5x270 cm 3.00 Unit


- Kusen A.4.2.1.11 22.05 m'
- Daun Pintu A.4.6.1.8.a 5.95 m2
- Engsel Pintu A.4.6.2.5 12.00 Set
- Lever Handle A.4.6.2.11.a 3.00 Set
- Kunci lockcase A.4.6.2.1.a 3.00 Set
- Door Stoper A.4.6.2.13 3.00 Set
- Door Closer A.4.6.2.10 3.00 Set
- Kaca 5 mm A.4.6.2.17 1.82 m2

4 P2 87,5x270 cm 15.00 Unit


- Kusen A.4.2.1.11 107.25 m'
- Daun Pintu A.4.6.1.8.a 28.87 m2
- Engsel Pintu A.4.6.2.5 60.00 Set
- Lever Handle A.4.6.2.11.a 15.00 Set
- Kunci lockcase A.4.6.2.1.a 15.00 Set
- Door Stoper A.4.6.2.13 15.00 Set
- Door Closer A.4.6.2.10 15.00 Set
- Kaca 5 mm A.4.6.2.17 6.00 m2

5 P3 77,5x220 cm 1.00 Unit


- Kusen A.4.2.1.11 5.17 m'
- Daun Pintu A.4.6.1.8.a 1.70 m2
- Engsel Pintu A.4.6.2.5 4.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set

RAB_Gedung Radiologi dan Laboratorium 256


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
- Door Closer A.4.6.2.10 1.00 Set

6 PS1 44x100 cm 2.00 Unit


- Kusen A.4.2.1.11 5.76 m'
- Daun Pintu A.4.6.1.8.a 0.88 m2
- Engsel Kupu-Kupu A.4.6.2.6 4.00 Set
- Handle : Pull Plate A.4.6.2.11.b 2.00 Set
- Kunci Pintu Window bolt with key A.4.6.2.4.a 2.00 Set

7 PT1 80x220 cm 4.00 Unit


- Kusen A.4.2.1.11 20.80 m'
- Daun Pintu A.4.6.1.8.a 5.90 m2
- Engsel Pintu A.4.6.2.5 12.00 Set
- Lever Handle A.4.6.2.11.a 4.00 Set
- Kunci lockcase A.4.6.2.1.a 4.00 Set
- Door Stoper A.4.6.2.13 4.00 Set

8 PT2 70x220 cm 1.00 Unit


- Kusen A.4.2.1.11 5.10 m'
- Daun Pintu A.4.6.1.8.a 1.31 m2
- Engsel Pintu A.4.6.2.5 3.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set

RAB_Gedung Radiologi dan Laboratorium 257


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
Jendela :
1 J1A 360x160 cm 8.00 Unit
- Kusen A.4.2.1.11 150.40 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 14.03 m2
- Kaca 5 mm A.4.6.2.17 28.44 m2
- Casement Handle A.4.6.2.11.b 16.00 Set
- Friction Stay A.4.6.2.9 32.00 Set

2 J2 240x220 cm 1.00 Unit


- Kusen A.4.2.1.11 18.40 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2
- Kaca 5 mm A.4.6.2.17 4.14 m2
- Casement Handle A.4.6.2.11.b 1.00 Set
- Friction Stay A.4.6.2.9 2.00 Set

3 J4 174x220 cm 5.00 Unit


- Kusen A.4.2.1.11 67.80 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 4.13 m2
- Kaca 5 mm A.4.6.2.17 13.63 m2
- Casement Handle A.4.6.2.11.b 5.00 Set
- Friction Stay A.4.6.2.9 10.00 Set

4 J4A 174x160 cm 4.00 Unit


- Kusen A.4.2.1.11 40.08 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 40.08 m2
- Kaca 5 mm A.4.6.2.17 3.30 m2
- Casement Handle A.4.6.2.11.b 4.00 Set
- Friction Stay A.4.6.2.9 4.00 Set

5 J8 856x350 cm 2.00 Unit


- Kusen A.4.2.1.11 138.48 m'
- Kaca 8 mm A.4.6.2.18 55.96 m2

6 J9 400x275 cm 1.00 Unit


- Kusen A.4.2.1.11 32.50 m'
- Kaca 5 mm A.4.6.2.17 10.30 m2

7 V1 70x54 cm 4.00 Unit


- Kusen A.4.2.1.11 9.92 m'
- Kaca 5 mm A.4.6.2.17 1.58 m2

RAB_Gedung Radiologi dan Laboratorium 258


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
8 V2 140x54 cm 18.00 Unit
- Kusen A.4.2.1.11 79.56 m'
- Kaca 5 mm A.4.6.2.17 14.47 m2

9 D1 264x140 cm 3.00 Unit


- Kusen A.4.2.1.11 28.44 m'
- Kaca 8 mm A.4.6.2.18 8.89 m2

C Lantai Atap
Pintu :
1 P7 97,5x220 cm 1.00 Unit
- Kusen A.4.2.1.11 5.37 m'
- Daun Pintu A.4.6.1.8.a 2.14 m2
- Engsel Pintu A.4.6.2.5 4.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set
- Door Closer A.4.6.2.10 1.00 Set
Sub Jumlah IV
V PEKERJAAN SANITAIR
A Lantai 1
1 Pas. Closet Duduk tipe 1 A.5.1.1.1 7.00 set
2 Pas. Shower Spray A.5.1.1.19.a 7.00 set
3 Pas. Floor Drain A.5.1.1.14 8.00 set
4 Pas. Wastafel wall hung tipe 1 A.5.1.1.5 3.00 set

RAB_Gedung Radiologi dan Laboratorium 259


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
5 Pas. Wastafel wall hung tipe 2 A.5.1.1.5.a 9.00 set
6 Pas. Sink 1 Lubang dengan Petirasan A.5.1.1.12 1.00 set
7 Pas. Kran Pantry A.5.1.1.19 1.00 set
8 Pas. Grab bar U&B 3.00 set
9 Pas. Grab bar Difable U&B 3.00 set
10 Pas. Spoel Hoek A.5.1.1.1.a 1.00 set
11 Pas. Kaca Cermin 5 mm ex. Lokal A.4.6.2.20 8.19 m2
12 Pas. Meja Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.11 m3

B Lantai 2
1 Pas. Closet Duduk tipe 1 A.5.1.1.1 3.00 set
2 Pas. Shower Spray A.5.1.1.19.a 3.00 set
3 Pas. Floor Drain A.5.1.1.14 5.00 set
4 Pas. Wastafel wall hung tipe 2 A.5.1.1.5.a 10.00 set
5 Pas. Wastafel counter top lavatory A.5.1.1.5.a 1.00 set
6 Pas. Sink 1 Lubang dengan Petirasan A.5.1.1.12 15.00 set
7 Pas. Kran Pantry A.5.1.1.19 15.00 set
8 Pas. Spoel Hoek A.5.1.1.1.a 2.00 set
9 Pas. Slob Sink A.5.1.1.1.a 1.00 set
10 Pas. Kaca Cermin 5 mm ex. Lokal A.4.6.2.20 4.68 m2
11 Pas. Meja Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 5.94 m3
12 Interior Melekat Bahan Multipleks Fin. HPL 100.04 m'
Sub Jumlah V
VI PEKERJAAN PENGECATAN
A Lantai 1
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 471.08 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 1,482.81 m2
3 Cat Plafond A.4.7.1.10.a 981.06 m2

B Lantai 2
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 590.21 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 1,806.22 m2
3 Cat Plafond A.4.7.1.10.a 770.00 m2

C Lantai Atap
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 44.22 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 42.20 m2

D Koridor
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 619.08 m2
2 Cat Plafond A.4.7.1.10.a 131.14 m2

RAB_Gedung Radiologi dan Laboratorium 260


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
Sub Jumlah VI
VII PEKERJAAN LAIN-LAIN
A Lantai 1
1 Pekerjaan Tangga :
a. Pas. Handrail dan Railling tangga 1 A.4.2.1.20.a 25.37 m2
b. Pas. Handrail dan Railling tangga 2 A.4.2.1.20.a 22.39 m2
2 Interior Melekat Meja Konter Bahan Multipleks Fin. HPL 5.66 m'

B Lantai 2
1 Pekerjaan Tangga :
a. Pas. Handrail dan Railling ( Void ) A.4.2.1.20.a 23.77 m2
Sub Jumlah VII
VIII ARSITEKTUR FASADE BANGUNAN
1 Pas. ACP Flat Tebal 0.3 mm + Pemasangan U&B 124.68 m2
2 Pas. Jalusi Aluminium U&B 79.04 m2
3 Pas. Signage :
- INSTALASI RADIOLOGI 1,033.20 cm
- INSTALASI LABORATORIUM 1,205.40 cm
Sub Jumlah VIII
JUMLAH TOTAL PEKERJAAN ARSITEKTUR

RAB_Gedung Radiologi dan Laboratorium 261


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
D PEKERJAAN MEKANIKAL ELEKTRIKAL
01 Instalasi Penerangan dan Kotak Kontak Lantai 1 & 2
Lantai 1
Kabel NYM 2 x 2.5 mm² dalam High Impact conduit dia. 20 mm
Instalasi penerangan 151.00 titik
1 Downlight LED Inbow 6 W 14.00 bh
2 Downlight LED Inbow 10 W 58.00 bh
3 Downlight LED Inbow 10 W + Nicad Batery 6.00 bh
4 Downlight LED Inbow 13 W 59.00 bh
5 Downlight LED Inbow 13 W+ Nicad Batery 8.00 bh
6 Lampu Led Baret Circular 10 W 6.00 bh
7 Sakelar Ganda 38.00 bh
8 Sakelar Tunggal 15.00 bh
9 Lampu Exit + baterai 2.00 bh
Kabel NYM 3x2.5 mm² dalam High Impact conduit dia. 20 mm
10 Instalasi kotak kontak 1p 101.00 titik
11 Instalasi Listrik Door full Hermatik 8.00 titik
12 Outlet kotak kontak dinding 1p 99.00 bh
13 Outlet kotak kontak lantai 2.00 bh
Lantai 2
Kabel NYM 2 x 2.5 mm² dalam High Impact conduit dia. 20 mm
Instalasi penerangan 163.00 titik
14 Downlight LED Inbow 6 W 4.00 bh
15 Downlight LED Inbow 10 W 34.00 bh
16 Downlight LED Inbow 10 W + Nicad Batery 2.00 bh
17 Downlight LED Inbow 13 W 96.00 bh
18 Downlight LED Inbow 13 W+ Nicad Batery 9.00 bh
19 Lampu Led Baret Circular 10 W 18.00 bh
20 Sakelar Ganda 30.00 bh
21 Sakelar Tunggal 10.00 bh
22 Lampu Exit + baterai 2.00 bh
Kabel NYM 3x2.5 mm² dalam High Impact conduit dia. 20 mm
23 Instalasi kotak kontak 1p 134.00 titik
24 Outlet kotak kontak dinding 1p 108.00 bh
25 Outlet kotak kontak Universal 9.00 bh
26 Outlet kotak kontak lantai 26.00 bh
Pekerjaan Grounding Listrik
26 BC 50 mm 105.00 meter
27 Sumuran grounding arus kuat tahanan maksimal 2 ohm 3.00 unit
Panel dan Kabel Feeder
Panel

RAB_Gedung Radiologi dan Laboratorium 262


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
28 SUB DISTRIBUSI PANEL IPRS (Wall mounted) (DIGEDUNG PANEL LV-MDP EKSISTING 1.00 Lot
29 SUB DISTRIBUSI PANEL RAD & LAB (Wall mounted) Lengkap dengan : set
Box Panel Ukuran 1200 x 80 x 25 cm 1.00 bh
MCCB 350A - 500A, 36kA, 3P 1.00 bh
MCCB 250A, 18kA, 3P 1.00 bh
MCCB 75A, 10kA, 3P 1.00 bh
MCCB 60A, 7,5kA, 3P 1.00 bh
MCCB 50A, 7,5kA, 3P 2.00 bh
MCB 10A, 3P, 10 kA 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Surge Arester tipe 1 3P+N 1.00 bh
Skun kabel + Material bantu 1.00 lot

RAB_Gedung Radiologi dan Laboratorium 263


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
30 SUB DISTRIBUSI PANEL CT SCAN & MRI(Wall mounted) Lengkap dengan : 1.00 set
Box Panel Ukuran 60 x 80 x 20 cm 1.00 bh
MCCB 350A, 36kA, 3P 1.00 bh
MCCB 250A, 18kA, 3P 2.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Surge Arester tipe 1 3P+N 1.00 bh
Skun kabel + Material bantu 1.00 lot

31 POWER PANEL X-RAY (Wall mounted) Lengkap dengan : set


Box Panel Ukuran 60 x 80 x 20 cm 1.00 bh
MCCB 250A, 18kA, 3P 1.00 bh
MCCB 160A, 18kA, 3P 1.00 bh
MCCB 125A, 18kA, 3P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Surge Arester tipe 1 3P+N 1.00 bh
Skun kabel + Material bantu 1.00 lot

32 POWER PANEL LANTAI 1 (Wall mounted)


Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 60A, 7,5kA, 3P 1.00 bh
MCCB 10A, 6kA, 3P 1.00 bh
MCB 25A, 6kA, 1P 1.00 bh
MCB 10A, 4,5kA, 1P 1.00 bh
MCB 16A, 4,5kA, 1P 15.00 bh
MCB 4A, 4,5kA, 1P 9.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
33 POWER PANEL LANTAI 2 (Wall mounted)
Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh

RAB_Gedung Radiologi dan Laboratorium 264


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
MCCB 50A, 7,5kA, 3P 1.00 bh
MCCB 25A, 6kA, 3P 1.00 bh
MCB 20A, 4,5kA, 1P 1.00 bh
MCB 10A, 4,5kA, 1P 4.00 bh
MCB 16A, 4,5kA, 1P 12.00 bh
MCB 4A, 4,5kA, 1P 9.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot

34 POWER PANEL AC 1 (Wall mounted)


Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 50A, 7,5kA, 3P 1.00 bh
MCCB 10A, 4,5kA, 1P 8.00 bh
MCB 16A, 4,5kA, 1P 5.00 bh
MCB 6A, 4,5kA, 1P 12.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot

RAB_Gedung Radiologi dan Laboratorium 265


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
35 POWER PANEL AC 2 (Wall mounted)
Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 75A, 10kA, 3P 1.00 bh
MCB 20A, 6kA, 3P 2.00 bh
MCCB 10A, 4,5kA, 1P 8.00 bh
MCB 16A, 4,5kA, 1P 7.00 bh
MCB 6A, 4,5kA, 1P 8.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot

36 POWER PANEL PP UPS (Wall mounted)


Box Panel Ukuran 60 x 80 x 20 cm 1.00 bh
MCCB 160A, 18kA, 3P 1.00 bh
MCCB 10A, 4,5kA, 1P 5.00 bh
MCB 16A, 4,5kA, 1P 21.00 bh
MCB 25A, 6kA, 3P 2.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot

37 Panel kontrol pompa air bersih transfer 1.00 bh


38 Panel kontrol pompa Booster 1.00 bh

Kabel Feeder
39 Kabel NYY 4 (4 x 150 mm²) (LV-MDP Gedung Eksisting - SDP IPRS )
40 Kabel NYFGBY 4 x 185 mm² (SDP IPRS - SDP. CT scan & Mri ) 154.00 m'
41 Kabel NYFGBY 2(4x120) mm² (SDP IPRS - SDP.Rad & lab) 142.00 m'
42 Kabel NYY 4 x 95 mm² ( SDP. CT scan & Mri - UPS CT SCAN - MESIN CT SCAN) m'
43 Kabel NYY 4 x 95 mm² ( SDP. CT scan & Mri - UPS MRI - MESIN MRI) m'
44 Kabel NYY 4 x 95 mm² ( SDP.Rad & lab - PP.X-RAY ) 55.00 m'
45 Kabel NYY 4 x 50 mm² ( PP.X-RAY - MESIN FLOUROSCOPY ) m'
46 Kabel NYY 4 x 35 mm² ( PP.X-RAY - MESIN X-RAY ) m'
47 Kabel NYY 4 x 50 mm² ( SDP.Rad & lab - UPS 80KVA- PP.UPS LAB) 74.00 m'
48 Kabel NYY 4x10 mm² (SDP.Rad & lab - PP LANTAI 1) 54.00 m'

RAB_Gedung Radiologi dan Laboratorium 266


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
49 Kabel NYY 4x10 mm² (SDP.Rad & lab - PP LANTAI 2) 20.00 m'
50 Kabel NYY 4x10 mm² (SDP.Rad & lab - PP AC 1) 54.00 m'
51 Kabel NYY 4x16 mm² (SDP.Rad & lab - PP AC 2) 20.00 m'
52 Kabel NYY 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 1 42.00 m'
53 Kabel NYY 4x4 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m'
54 Kabel NYY 3x4 mm² (PP LANTAI 2 - POMPA BOOSTER) 102.00 m'
55 Kabel NYY 4x4 mm² (PP Lantai 1 - Mamografi) 33.00 m'
56 Kabel NYY 3x4 mm² (PP Lantai 1 - Panaromig) 43.00 m'
57 Kabel NYY 3x4 mm² (PP LANTAI 2 - P. RO) 72.00 m'
58 Kabel NYY 4x4 mm² (PP- AC Lantai 2 - AC LAB 1) 105.00 m'
59 Kabel NYY 4x4 mm² (PP- AC Lantai 2 - AC LAB 2) 106.00 m'

Grounding Arus kuat


60 Kabel 120 BC mm² (GROUNDING PENTANAHAN - SDP. CT scan & Mri) 25.00 m'
61 Kabel BC 150 mm² (GROUNDING PENTANAHAN 2 - SDP.Rad & lab) 35.00 m'
62 Kabel BC 50 mm² (GROUNDING PENTANAHAN 3 - PP X-RAY) 25.00 m'
63 Kabel BC 35 mm² (SDP.Rad & lab - UPS 80 KVA - PP.UPS LAB) 74.00 m'
64 Kabel BC 6 mm² (SDP.Rad & lab - PP Lantai 1) 20.00 m'
65 Kabel BC 6 mm² (SDP.Rad & lab - PP Lantai 2) 54.00 m'
66 Kabel BC 6 mm² (SDP.Rad & lab - PP AC 1) 20.00 m'
67 Kabel BC 10 mm² (SDP.Rad & lab - PP AC 2) 54.00 m'
68 Kabel BC 6 mm² (PP lantai 1 - Pompa Transfer AB) 102.00 m'
69 Kabel BC 4 mm² (PP Lantai 1 - DUMB WAITER 1 42.00 m'
70 Kabel BC 4 mm² (PP Lantai 1 - Mamografi) 33.00 m'
71 Kabel BC 4 mm² (PP- AC Lantai 2 - AC LAB 1) 105.00 m'
72 Kabel BC 4 mm² (PP- AC Lantai 2 - AC LAB 2) 106.00 m'

RAB_Gedung Radiologi dan Laboratorium 267


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5

Pekerjaan Kabel Ladder dan Tray


Arus kuat
Lantai 1
98 Kabel Tray/cage uk lebar 400 mm x 3000 mm H 100 24.00 m'
99 Kabel Tray/cage uk lebar 300 mm x 3000 mm H 50 61.00 m'
100 Kabel Tray/cage uk lebar 200 mm x 3000 mm H 50 + cover 46.00 m'
101 Tee Ukuran 30 cm 4.00 bh
102 Elbow Ukuran 30 cm 2.00 bh
103 In Out Rider Ukuran 30 cm 1.00 bh
104 In Out Rider Ukuran 20 cm 5.00 bh
105 Reducer 4.00 bh
106 Supporting(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls
Lantai 2
108 Kabel Tray/cage uk lebar 300 mm x 3000 mm H 50 54.00 m'
109 Kabel Tray/cage uk lebar 200 mm x 3000 mm H 50 + cover 12.00 m'
110 Tee Ukuran 30 cm 1.00 bh
111 Elbow Ukuran 30 cm 2.00 bh
112 In Out Rider Ukuran 20 cm 2.00 bh
113 Elbow Ukuran 20 cm 1.00 bh
114 Reducer 2.00 bh
115 Supporting(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls
Arus Lemah
Lantai 1
116 Kabel Tray/cage uk lebar 200 mm x 3000 mm H 50 67.00 m'
117 Elbow Ukuran 20 cm 2.00 bh
118 Tee Ukuran 20 cm 1.00 bh
119 In Out Rider Ukuran 20 cm 1.00 bh
120 Supporting(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls
Lantai 2
120 Kabel Tray/cage uk lebar 200 mm x 3000 mm H 50 65.00 m'
121 Elbow Ukuran 20 cm 2.00 bh
122 In Out Rider Ukuran 20 cm 2.00 bh
123 Tee Ukuran 20 cm 1.00 bh
124 Supporting(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls
Sub Jumlah Instalasi Penerangan & kotak kontak
02 Instalasi Tata Udara / AC Lantai 1 & 2
Instalasi AC lengkap dengan Bracket, Pipa referigerant & Drain, pengkabelan & supporting
instalasi ac lantai 1
1 Instalasi Power AC 1 Fasa (NYM 3x2.5 mm²) 25.00 titik
2 Air Conditioning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 11.00 unit

RAB_Gedung Radiologi dan Laboratorium 268


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
3 Air Conditioning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 4.00 unit
4 Air Conditioning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 4.00 unit
5 Air Conditioning split Kap. 12.500 BTUH / 1 1/2 pk tipe wall mounted 1.00 unit
6 Air Conditioning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 4.00 unit
7 Air Conditioning split Kap. 18000 BTUH / 2 pk tipe Ceiling Casette 1.00 unit
8 Outlet Stop kontak AC 1 phase 25.00 bh
9 Pipa referigerant 1/4″ + 3/8″ + Isolasi 190.00 m'
10 Pipa referigerant 1/4″ + 1/2″ + Isolasi 60.00 m'
11 Pipa Drain PVC AW 1 1/4" + Isolasi 64.00 m'
12 Pipa Drain PVC AW 1'' + Isolasi 40.00 m'
13 Pipa Drain PVC AW 3/4'' + Isolasi 125.00 m'
instalasi ac lantai 2
14 Instalasi Power AC 1 Fasa (NYM 3x2.5 mm²) 21.00 titik
15 Air Conditioning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 7.00 unit
16 Air Conditioning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 1.00 unit
17 Air Conditioning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 4.00 unit
18 Air Conditioning split Kap. 12.500 BTUH / 1 1/2 pk tipe wall mounted 5.00 unit
19 Air Conditioning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 2.00 unit
20 Outlet Stop kontak AC 1 phase 21.00 bh
21 Pipa referigerant 1/4″ + 3/8″ + Isolasi 120.00 m'
22 Pipa referigerant 1/4″ + 1/2″ + Isolasi 70.00 m'
23 Pipa Drain PVC AW 1 1/4" + Isolasi 59.00 m'
24 Pipa Drain PVC AW 1'' + Isolasi 72.00 m'
25 Pipa Drain PVC AW 3/4'' + Isolasi 95.00 m'

RAB_Gedung Radiologi dan Laboratorium 269


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
26 Air Conditioning split Duct. 60.000 BTUH lengkap 2.00 lot
Instalasi ducting Ruang Lab
Supply air duct bahan Polyurethane c/w supporting
- ukuran 25 x 30 cm
- ukuran 25x 60 cm
- ukuran 25 x 80 cm
Return air duct bahan Polyurethane c/w supporting
- ukuran 25 x 30 cm
- ukuran 25x 60 cm
- ukuran 25 x 80 cm
- Plenum box
Diffuser SAG 500 cfm( 4 buah)
RAG 50 x 35 500 cfm(4 buah)
Volume Damper
FAN Lantai 1 & 2
27 Instalasi Power FAN 1 Fasa (NYM 3x2.5 mm²) 20.00 titik
28 Pipa PVC kelas D dia. 100 mm atau 4" 66.00 m'
29 Alumunium flexible ducting 4 inch 22.00 m'
30 Grill Exchaust fan Toilet ukuran 20 x 20 cm 6.00 bh
31 Ceiling Exhausth Fan tipe sirocco 50 cfm 11.00 unit
32 Industrial Wall Exchaust FAN 10" kap. 300 CFM 0.4 in wg low noise c/w asesories 9.00 unit
Sub Jumlah Instalasi Pengkondisian Udara / AC
03 Instalasi Telephone Lantai 1 & 2
Instalasi Kabel ITC 2x0.6mm² dalam High Impact conduit dia. 20 mm
1 Instalasi Telephone 17.00 titk
2 Hand set Telephone single line 17.00 bh
3 Outlet Telephone dinding 1 Pole 17.00 bh
Peralatan Utama
4 Unit utama PABX kap. 8 co line 32Extention lengkap dengan : 1.00 set
- Main Unit PABX, Power suplai, memory card, Extension card, analog card
- Pemasangan & Pemrograman
5 Box MDF c/w frame & LSA40 Ext. 1.00 set
6 Kabel ITC 20x2x0.6mm² (MDF - PABX) 75.00 m'
Sub Jumlah Instalasi Telephone
04 Instalasi Fire Alarm Lantai 1 & 2
Kabel NYA 2x1x1.5 mm² dalam High Impact conduit dia. 20 mm
1 Instalasi Heat Detector type Rate Of Rise (ROR) 69.00 titik
2 Heat detector ROR 48.00 bh
3 Smoke Detector 21.00 bh
4 End of Line 6.00 unit
Peralatan Utama

RAB_Gedung Radiologi dan Laboratorium 270


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
5 Main Control Fire Alarm (MCFA) tipe konvensional 10 Zone lengkap dengan peralatan 1.00 unit
6 Pemrograman MCFA 1.00 unit
7 UPS 1200 VA 1.00 ls
Sub Jumlah Instalasi Fire Alarm
05 Instalasi Kabel Data Komputer Lantai 1 & 2
Wifi hotspot
1 Kabel UTP Cat 6 dalam High Impact conduit dia. 20 mm
2 Instalasi Kabel Data Wifi 4.00 titik
3 Wifi Access Point 802,11n - 2,4GHz/5GHz R11 Meter 4.00 bh
4 Instalasi Kotak Kontak untuk Wifi (NYM 3x2,5mm2) 4.00 titik
5 Kotak Kontak Outbow 4.00 bh
6 Managed Switch Hub untuk UTP cat 6. kap 8 Port 2.00 bh
7 Instalasi power Switch Hub & Kotak Kontak. 2.00 bh
8 Instalasi Switch/ Hub ke Hub Consentrator Ke eksisting 1.00 titik
Sub Jumlah Instalasi Kabel Data Komputer
06 Instalasi CCTV Lantai 1 & 2
Kabel COAXIAL. RG 59 18AWG BC 95% dengan kabel power dalam High Impact conduit dia. 20 mm
1 Instalasi Kamera CCTV 7.00 titik
2 High Resolution Dome Camera high resolution lengkap dengan Power adaptor & asesori 7.00 bh
3 High Resolution In door Box CCD Camera day and night lengkap dengan Power adaptor 1.00 bh
Peralatan utama / Sentral CCTV
sentral CCTV lengkap dengan peralatan, pemasangan, pengkabelan & asesories
4 DVR Card Kap. 8 Channel C/W Hard Disks 2 terrabyte 1.00 unit
5 TV Monitor 32 inch 1.00 unit
6 UPS 2000 VA 1.00 ls
7 Meja CCTV 1.00 ls
Sub Jumlah Instalasi CCTV

RAB_Gedung Radiologi dan Laboratorium 271


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
07 Air Bekas, Kotor dan Vent Lantai 1 & 2
PIPA PVC AW lengkap dengan fitting, bobokan & Penggantung
Lantai 1 & 2
1 Pipa PVC kelas AW dia. 150 mm atau 6" 51.00 m'
2 Pipa PVC kelas AW dia. 100 mm atau 4" 330.00 m'
3 Pipa PVC kelas AW dia. 80 mm atau 3" 72.00 m'
4 Pipa PVC kelas AW dia. 50 mm atau 2" 48.00 m'
5 Pipa PVC kelas AW dia.32 mm atau 1 1/4" 66.00 m'
6 Portable Grease trap pelat stainless ukuran (Pxlxt) 50x30x45 cm 1.00 unit
7 Bak Penampung infeksius kap. 3 m3 1.00 unit
- Galian
- struktur beton & Tutup beton
- Peralatan penetral logam
- finishing
8 Bak Penampung(Sumpit) kap. 2,5 m3 1.00 unit
- Galian
- struktur beton & Tutup beton
- Peralatan penetral logam
- finishing
9 Pompa Celup Sewage Kapasitas 100 L/m lengkap dengan instalasi power + aksesoris p 2.00 unit
10 Septictank Bio Limbah rumah sakit Kapasitas 2.000 Liter Lengkap dengan 2.00 unit
Galian & seling pengikat
Cairan pengurai dan tablet disinfeksikan
Penutup Septictank Bio (dinding Bata) + Tutup Plat besi 1,2 mm unit
11 Manhole bak 30X30 Clean out 4 inci(area lantai 1) 9.00 Lot
Tutup manhole dak bak bata/plesteran
Clean out 4 inci
elbow 4 inci
12 Clean out 4 inci (area lantai 2) 6.00 bh
13 Fitting + Supporting(Gantungan Pipa Besi Siku 50mm, Dynabolt, Mur & baut ) 1.00 lot
Site Plan
14 Pengadaan & pemasangan sistem IPAL
Sub Jumlah Instalasi Air Bekas, Kotor & Vent
08 Air Bersih Lantai 1 & 2
PIPA PPR PN 10 lengkap dengan fitting, bobokan & Penggantung
Lantai 1 & 2
1 Pipa PPR PN 10 dia. 50 atau 1 1/2 " (ruang pompa ke roof tank) 90.00 m'
2 Pipa PPR PN 10 dia. 50 atau 1 1/2 " 50.00 m'
3 Pipa PPR PN 10 dia. 40 atau 1 1/4 " 151.00 m'
4 Pipa PPR PN 10 dia. 32 atau 1 " 140.00 m'
5 Pipa PPR PN 10 dia. 25 atau 3/4" 45.00 m'

RAB_Gedung Radiologi dan Laboratorium 272


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
6 Pipa PPR PN 10 dia. 20 atau 1/2" 220.00 m'
7 Gate Valve dia. 50 atau 1 1/2 " 2.00 bh
8 Gate Valve dia. 40 atau 1 1/4 " 3.00 bh
9 Fitting + Supporting(Gantungan Pipa Besi Siku 50mm, Dynabolt, Mur & baut ) 1.00 lot
POMPA TRANSFER AIR BERSIH
10 Paket Pompa Transfer air bersih kap. 8m3/jam Total head 40 meter 4 kw (1 Pompa) (len 1.00 set
Gate valve 1 1/2''
Check valve 1 1/2''
Foot Valve 1 1/2''
Pressure Gauge
Panel kontrol pompa air bersih transfer
11 Bangunan/Struktur reservoir Ground Water Tank (GWT) kap. 2x40 m3 & rumah pompa 1.00 ls

RAB_Gedung Radiologi dan Laboratorium 273


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
AIR BERSIH
Reverse di AtapSystem Lengkap dengan
Osmosis
12 Light Commercial Reverse Osmosis 1.00 set
a Stainless Steel Membrane vessel 4040 Seamless
Membrane Reverse Osmosis 2000gpd
Feeder Pump Shimizhu 135
Stainless steel Frame Hollow 40x40 1,2mm
Vertical Multistage Centrifugal
Flow Meter 5gpm
Gate valve 3/4 Bronze
Pressure Gauge 5bar
Pressure Gauge 15bar
Selenoid bronze inline 3/4"
Timer w/t auto flushing
Sediment 20" 1 mikron blue
High Pressure Swicth
piping PVC rucika AW before housing membrane
Reducer pressure system
Pre-Treatment
b Fiber Tube FRP 1054 polypropelene
Lengkap dengan
Fiber Tube FRP 1354 polypropelene Softener
Multimedia Filter, P. Silica
Carbon Home ( Srilangka )
ResinFilter
Pre Softener Lewatit
Cartrige 20"
Sediment 20" 5 mikron blue
Sediment 20" 1 mikron blue
Pump
Horizontal
Pipa Pump Maxon multistage
Instalasi
PVC sebelum
Elektrikal proses
Instalasi filterisasi, pembuangan & limbah
1phase
c Panel 30x40
MCB
Relay
Nol Arde
Terminal
Pilot Lamp
Swicth Controller
d Ultraviolet Unitec 12gpm w/t alarm

13 Indicator & Protection Lengkap dengan 1.00 set


Automatic Flushing Valve w/t Timer Sistem
High Pressure alarm indicator Sistem
Cut Off High pressure sistem w/t Alarm Indicator

RAB_Gedung Radiologi dan Laboratorium 274


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
14 Cleaning In place Lengkap dengan 1.00 set
Chemical Cleaning RO123
Piping & valve for cleaning
Circulation Valve Pvc 3/4

15 Automatic Backwash, Rinse valve Lengkap dengan 1.00 set


Automatic Backwash, Fast rinse and Filter Valve Runxin
Solenoid 3/4 Plastic, pressure release valve
Auto switch pump operation

16 Anti scalant & anti fouling Lengkap dengan 1.00 set


Dosing pump Solenoid Drive Tacmina
DES08 anti fouling chemical
Injection Pipe pvc 3/4"
17 Pompa Booster Stainless Steel air bersih kap. 5 m3/h Total head 50 meter 0,83 Kw leng 3.00 set
18 Header 3'' 1.00 set
19 Gate Valve 1 1/2 '' 5.00 bh
20 Rooftank Stainless Steel kap. 2,000 liter ukuran : dia. 1,45 meter tinggi 1,5meter (RO) 1.00 unit
21 Rooftank Stainless Steel kap. 1,000 liter ukuran : dia. 0,99 meter tinggi 1,45meter (RO) 2.00 unit
22 Rooftank Fiber kap. 2000 liter ukuran : dia. 1.45 tinggi 1.5 meter lengkap dengan perala 2.00 unit
23 Water Level Control 2.00 unit
24 Paket Pompa Booster air bersih kap. 5m3 Total head 40 meter 0,816 Kw lengkap dengan 1.00 unit
Sub Jumlah Instalasi Air Bersih

RAB_Gedung Radiologi dan Laboratorium 275


KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA

1 2 3 4 5
09 Penanggulangan Kebakaran
1 Fire Extinguisher kap. 3 Kg Klass ABC tipe CO2 6.00 unit
Sub Jumlah Instalasi Penanggulangan Kebakaran
10 Saluran air hujan
1 Pipa PVC kelas AW dia. 150 mm atau 6" 115.00 m'
1 Pipa PVC kelas AW dia. 100 mm atau 4" 105.00 m'
3 Roof Drain dia. 100 mm atau 4" 7.00 bh
4 Fitting + Supporting 1.00 lot
5 Saluran drainase tipe terbuka lengkap dengan : m'
6 Bak Kontrol 50X50 bh
Sub Jumlah Instalasi Saluran Air Hujan
11 Dumbwaiter
1 Dumbwaiter Kapasitas 100 Kg 2 lantai Termasuk Biaya ongkos kirim & jasa 1.00 unit
Ukuran Box 700(w) x 700(D) x 800(H)
2 Pekerjaan sipil Untuk Dumb waiter (beam,wp,baja & asseories) 1.00 lot
Sub Jumlah Instalasi Dumbwaiter
JUMLAH TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL

RAB_Gedung Radiologi dan Laboratorium 276


RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

: PEMBANGUNAN GEDUNG RADIOLOGI DAN LABORATORIUM


NSI : RUMAH SAKIT UMUM DAERAH DR. AGOESDJAM
: JL. MAYJEND D.I. PANJAITAN NO. 51 KABUPATEN KETAPANG
ARAN : 2018

KODE HARGA SATUAN


URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
AAN STRUKTUR GEDUNG
AAN PENDAHULUAN
gan Bowplank 2.2.1.4.a 128.00 M' 65,488.50
karan 1.00 Lsm 15,000,000.00
mentara 2.2.1.2.a 171.40 M' 304,623.00
ma Proyek 1.00 Lsm 400,000.00
Sub Jumlah I
AAN PONDASI
n Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 597.00 Btg 1,600,000.00

ngan Mini Pile 25 x 25 K450 3,582.00 M' 120,000.00


kan Mini Pile 199.00 Titik 40,000.00
nah Pondasi 2.3.1.1 104.79 M³ 90,612.50
asir t = 10 cm 2.3.1.11 12.33 M³ 141,845.00
ja t = 5 cm 4.1.1.4 6.16 M³ 996,598.84
P2
Ready Mix K-300 B. 13.i.2 3.47 M³ 1,682,037.50
gan U32 4.1.1.17.b 296.34 Kg 18,317.75
ing Pondasi 4.1.1.20.a 13.16 M² 135,487.00
P3
Ready Mix K-300 B. 13.i.2 3.14 M³ 1,682,037.50
gan U32 4.1.1.17.b 211.65 Kg 18,317.75
ing Pondasi 4.1.1.20.a 7.98 M² 135,487.00
P4
Ready Mix K-300 B. 13.i.2 16.82 M³ 1,682,037.50
gan U32 4.1.1.17.b 1,574.46 Kg 18,317.75
ing Pondasi 4.1.1.20.a 43.40 M² 135,487.00
P6
Ready Mix K-300 B. 13.i.2 4.99 M³ 1,682,037.50
gan U32 4.1.1.17.b 326.04 Kg 18,317.75
ing Pondasi 4.1.1.20.a 10.78 M² 135,487.00

RAB_Gedung Radiologi dan Laboratorium 277


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
P7
Ready Mix K-300 B. 13.i.2 14.81 M³ 1,682,037.50
gan U32 4.1.1.17.b 892.79 Kg 18,317.75
ing Pondasi 4.1.1.20.a 25.76 M² 135,487.00
P9
Ready Mix K-300 B. 13.i.2 18.52 M³ 1,682,037.50
gan U32 4.1.1.17.b 1,115.98 Kg 18,317.75
ing Pondasi 4.1.1.20.a 32.20 M² 135,487.00
P12
Ready Mix K-300 B. 13.i.2 24.55 M³ 1,682,037.50
gan U32 4.1.1.17.b 1,416.86 Kg 18,317.75
ing Pondasi 4.1.1.20.a 37.45 M² 135,487.00
ndasi K1 Uk. 45x45 cm
Ready Mix K-225 B. 13.f.2 4.25 M³ 1,513,737.50
gan U32 4.1.1.17.b 1,722.01 Kg 18,317.75
gan U24 4.1.1.17.a 167.82 Kg 16,585.25
ing Pondasi 4.1.1.20.a 37.80 M² 135,487.00
Sub Jumlah II 1
AAN STRUKTUR
Lantai 1
35x60 cm
Ready Mix K-225 B. 13.f.2 51.44 M³ 1,513,737.50
gan U32 4.1.1.17.b 10,291.28 Kg 18,317.75
gan U24 4.1.1.17.a 2,056.54 Kg 16,585.25
ing Sloof 4.1.1.21.a 396.83 M² 135,487.00

RAB_Gedung Radiologi dan Laboratorium 278


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
25x50 cm
Ready Mix K-225 B. 13.f.2 18.30 M³ 1,513,737.50
gan U32 4.1.1.17.b 2,342.60 Kg 18,317.75
gan U24 4.1.1.17.a 626.81 Kg 16,585.25
ing Sloof 4.1.1.21.a 192.10 M² 135,487.00
20x40 cm
Ready Mix K-225 B. 13.f.2 2.05 M³ 1,513,737.50
gan U32 4.1.1.17.b 298.75 Kg 18,317.75
gan U24 4.1.1.17.a 90.56 Kg 16,585.25
ing Sloof 4.1.1.21.a 27.39 M² 135,487.00
15x40 cm
Ready Mix K-225 B. 13.f.2 0.54 M³ 1,513,737.50
gan U32 4.1.1.17.b 76.42 Kg 18,317.75
gan U24 4.1.1.17.a 29.03 Kg 16,585.25
ing Sloof 4.1.1.21.a 9.08 M² 135,487.00
ong Uk.10x30 cm (blk.35/60)
Ready Mix K-225 B. 13.f.2 3.46 M³ 1,513,737.50
mesh M6 4.1.1.19 192.49 Kg 13,993.65
ing Sloof 4.1.1.21.a 69.24 M² 135,487.00
ran Tutup Kolong Uk.10x30 cm (blk.35/60) 4.4.2.4 49.40 M² 71,177.04
ong Uk.10/50 (blk.20/40)
Ready Mix K-225 B. 13.f.2 0.36 M³ 1,513,737.50
mesh M6 4.1.1.19 18.14 Kg 13,993.65
ing Sloof 4.1.1.21.a 7.25 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 4.89 M² 71,177.04
Uk. 45x45 cm Lt.1
Ready Mix K-225 B. 13.f.2 20.66 M³ 1,513,737.50
gan U32 4.1.1.17.b 3,612.60 Kg 18,317.75
gan U24 4.1.1.17.a 700.91 Kg 16,585.25
ing Kolom 4.1.1.22 b 183.60 M² 224,636.50
Uk. 30x30 cm Lt.1
Ready Mix K-225 B. 13.f.2 0.65 M³ 1,513,737.50
gan U32 4.1.1.17.b 113.69 Kg 18,317.75
gan U24 4.1.1.17.a 19.75 Kg 16,585.25
ing Kolom 4.1.1.22 b 8.64 M² 224,636.50
ktis Uk.9x9 cm Lt.1
K175 4.1.1.4 6.33 M³ 996,598.84
gan U24 4.1.1.17.a 1,577.16 Kg 16,585.25
ing 4.1.1.20.a 70.31 M² 135,487.00
ktis Uk.9x9 cm Lt.1 (dinding)
K175 4.1.1.4 0.47 M³ 996,598.84

RAB_Gedung Radiologi dan Laboratorium 279


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
gan U24 4.1.1.17.a 115.98 Kg 16,585.25
ing 4.1.1.20.a 5.21 M² 135,487.00
Struktur Lantai 1
Lantai 2
Dack Uk.15/40 elv. 3.110
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.36 M³ 2,041,737.50
gan U32 4.1.1.17.b 726.66 Kg 18,317.75
gan U24 4.1.1.17.a 251.69 Kg 16,585.25
ing Balok 4.1.1.23.b 79.54 M² 228,085.00
ack elv. 3.110
Ready Mix K-225 menggunakan pompa B. 13.f.1 12.57 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 710.07 Kg 13,993.65
ing Lantai 4.1.1.24.b 146.98 M² 253,676.50
ran List Plat Dack elv. 3.110 4.4.2.4 262.03 M² 71,177.04
35x60 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 51.08 M³ 2,041,737.50
gan U32 4.1.1.17.b 10,291.28 Kg 18,317.75
gan U24 4.1.1.17.a 2,042.21 Kg 16,585.25
ing Balok 4.1.1.23.b 394.07 M² 228,085.00
25x50 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 17.50 M³ 2,041,737.50
gan U32 4.1.1.17.b 2,241.55 Kg 18,317.75
gan U24 4.1.1.17.a 599.43 Kg 16,585.25
ing Balok 4.1.1.23.b 183.70 M² 228,085.00

RAB_Gedung Radiologi dan Laboratorium 280


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
20x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 2.53 M³ 2,041,737.50
gan U32 4.1.1.17.b 361.24 Kg 18,317.75
gan U24 4.1.1.17.a 111.40 Kg 16,585.25
ing Balok 4.1.1.23.b 33.72 M² 228,085.00
15x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.54 M³ 2,041,737.50
gan U32 4.1.1.17.b 75.79 Kg 18,317.75
gan U24 4.1.1.17.a 28.80 Kg 16,585.25
ing Balok 4.1.1.23.b 9.00 M² 228,085.00
Uk. 45x45 cm (elv.4.00-8.00) Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 20.96 M³ 2,041,737.50
gan U32 4.1.1.17.b 3,211.20 Kg 18,317.75
gan U24 4.1.1.17.a 710.78 Kg 16,585.25
ing Kolom 4.1.1.22 b 186.30 M² 224,636.50
Uk. 30x30 cm (elv.4.00-8.00) Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.65 M³ 2,041,737.50
gan U32 4.1.1.17.b 113.69 Kg 18,317.75
gan U24 4.1.1.17.a 19.75 Kg 16,585.25
ing Kolom 4.1.1.22 b 8.64 M² 224,636.50
ktis Uk.9x9 cm Lt.2
K175 4.1.1.4 4.96 M³ 996,598.84
gan U24 4.1.1.17.a 1,235.56 Kg 16,585.25
ing 4.1.1.20.a 55.08 M² 135,487.00
ktis Uk.9x9 cm Lt.2
K175 4.1.1.4 0.70 M³ 996,598.84
gan U24 4.1.1.17.a 172.14 Kg 16,585.25
ing 4.1.1.20.a 7.74 M² 135,487.00

15x40 cm elv.4.5
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.53 M³ 2,041,737.50
gan U32 4.1.1.17.b 510.96 Kg 18,317.75
gan U24 4.1.1.17.a 179.29 Kg 16,585.25
ing Balok 4.1.1.23.b 56.63 M² 228,085.00
ktis Uk.9x9 cm elv.4.5
K175 4.1.1.4 0.31 M³ 996,598.84
gan U24 4.1.1.17.a 79.88 Kg 16,585.25
ing 4.1.1.20.a 6.91 M² 135,487.00
ack elv. 4.5
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.44 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 397.22 Kg 13,993.65

RAB_Gedung Radiologi dan Laboratorium 281


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
ing Lantai 4.1.1.24.b 57.35 M² 253,676.50
ran List Plat Dack elv. 4.5 4.4.2.4 101.28 M² 71,177.04

elv.7.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.12 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 547.71 Kg 13,993.65
ing Lantai 4.1.1.24.b 70.71 M² 253,676.50
ran List Dack elv. 7.20 4.4.2.4 79.07 M² 71,177.04
dack Uk.15x40 elv.7.20
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.93 M³ 2,041,737.50
gan U32 4.1.1.17.b 564.33 Kg 18,317.75
gan U24 4.1.1.17.a 195.05 Kg 16,585.25
ing Balok 4.1.1.23.b 78.04 M² 228,085.00

20x80 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 5.13 M³ 2,041,737.50
gan U32 4.1.1.17.b 745.75 Kg 18,317.75
gan U24 4.1.1.17.a 156.22 Kg 16,585.25
ing Balok 4.1.1.23.b 36.66 M² 228,085.00
25x55 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.38 M³ 2,041,737.50
gan U32 4.1.1.17.b 471.81 Kg 18,317.75
gan U24 4.1.1.17.a 116.05 Kg 16,585.25
ing Balok 4.1.1.23.b 35.44 M² 228,085.00

RAB_Gedung Radiologi dan Laboratorium 282


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
20x45 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.54 M³ 2,041,737.50
gan U32 4.1.1.17.b 162.48 Kg 18,317.75
gan U24 4.1.1.17.a 44.90 Kg 16,585.25
ing Balok 4.1.1.23.b 16.12 M² 228,085.00
20x40 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 2.71 M³ 2,041,737.50
gan U32 4.1.1.17.b 299.22 Kg 18,317.75
gan U24 4.1.1.17.a 89.53 Kg 16,585.25
ing Balok 4.1.1.23.b 33.85 M² 228,085.00
elv. 7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.86 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 405.24 Kg 13,993.65
ing Lantai 4.1.1.24.b 22.21 M² 253,676.50
ran Plat Dack elv. 7.60 4.4.2.4 22.21 M² 71,177.04
Plat Dack elv. 7.60 4.4.2.27 22.21 M² 44,682.00
proofing Plat Dack elv. 7.60 A.4.7.1.10.f 22.21 M² 26,582.05

25x55 cm Elv.8.00
Ready Mix K-225 menggunakan pompa B. 13.f.1 26.50 M³ 2,041,737.50
gan U32 4.1.1.17.b 3,518.01 Kg 18,317.75
gan U24 4.1.1.17.a 907.70 Kg 16,585.25
ing Balok 4.1.1.23.b 278.25 M² 228,085.00
Uk. 15x15 cm el,8.00
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.16 M³ 2,041,737.50
gan U32 4.1.1.17.b 60.02 Kg 18,317.75
gan U24 4.1.1.17.a 8.22 Kg 16,585.25
ing Kolom 4.1.1.22 b 2.16 M² 224,636.50
ktis Uk.9x9 cm elv.8.00
K175 4.1.1.4 0.04 M³ 996,598.84
gan U24 4.1.1.17.a 9.99 Kg 16,585.25
ing 4.1.1.20.a 0.86 M² 135,487.00
ktis Uk.9x9 cm elv.8.00
K175 4.1.1.4 1.85 M³ 996,598.84
gan U24 4.1.1.17.a 41.04 Kg 16,585.25
ing 4.1.1.20.a 20.50 M² 135,487.00

20x40 cm Elv.9.80
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.20 M³ 2,041,737.50
gan U32 4.1.1.17.b 132.64 Kg 18,317.75
gan U24 4.1.1.17.a 39.90 Kg 16,585.25

RAB_Gedung Radiologi dan Laboratorium 283


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
ing Balok 4.1.1.23.b 15.00 M² 228,085.00
elv. 9.80
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.66 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 138.78 Kg 13,993.65
ing Lantai 4.1.1.24.b 13.64 M² 253,676.50
ran Plat Dack 4.4.2.4 13.64 M² 71,177.04
Plat Dack 4.4.2.27 13.64 M² 44,682.00
proofing Plat Dack A.4.7.1.10.f 13.64 M² 26,582.05
Struktur Lantai 2 1
Sub Jumlah III
AAN PLAT LANTAI
i1
Ready Mix K-225 t =12 cm B. 13.f.2 107.63 M³ 1,513,737.50
mesh 2xM7 4.1.1.19 7,480.15 Kg 13,993.65
ing Lantai 4.1.1.24.c 721.82 M² 228,613.00
i2
Ready Mix K-225 t =12 cm menggunakan pompa B. 13.f.1 103.90 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 7,221.06 Kg 13,993.65
ing Lantai 4.1.1.24.b 709.70 M² 253,676.50
Sub Jumlah IV

RAB_Gedung Radiologi dan Laboratorium 284


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
AAN TANGGA
pe T1 (2 Unit)
des uk. 15x40 cm
Ready Mix K-225 B. 13.f.2 0.31 M³ 1,513,737.50
gan U32 4.1.1.17.b 50.53 Kg 18,317.75
gan U24 4.1.1.17.a 19.67 Kg 16,585.25
ing Balok 4.1.1.23.b 6.48 M² 228,085.00
ran Balok Bordes 15/40 4.4.2.4 6.48 M² 71,177.04
s
Ready Mix K-225 t = 14 cm B. 13.f.2 1.31 M³ 1,513,737.50
gan U24 4.1.1.17.a 173.55 Kg 16,585.25
ing Balok 4.1.1.23.b 6.62 M² 228,085.00
ran Bawah Bordes 15/40 4.4.2.4 6.62 M² 71,177.04
ga
Ready Mix K-225 t = 14 cm B. 13.f.2 3.20 M³ 1,513,737.50
gan U24 4.1.1.17.a 612.01 Kg 16,585.25
ing Plat 4.1.1.24.b 22.89 M² 253,676.50
ran Bawah Plat tangga 15/40 4.4.2.4 22.89 M² 71,177.04
gga
Ready Mix K-225 B. 13.f.2 1.73 M³ 1,513,737.50
mesh M6 4.1.1.19 345.28 Kg 13,993.65
ing 4.1.1.21.a 11.52 M² 135,487.00
pe T2 (1 Unit)
des uk. 15x40 cm
Ready Mix K-225 B. 13.f.2 0.16 M³ 1,513,737.50
gan U32 4.1.1.17.b 25.26 Kg 18,317.75
gan U24 4.1.1.17.a 9.84 Kg 16,585.25
ing Balok 4.1.1.23.b 3.24 M² 228,085.00
ran Balok Bordes 15/40 4.4.2.4 3.24 M² 71,177.04
s
Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³ 1,513,737.50
gan U24 4.1.1.17.a 86.78 Kg 16,585.25
ing Balok 4.1.1.23.b 6.40 M² 228,085.00
ran Bawah Bordes 15/40 4.4.2.4 6.40 M² 71,177.04
ga
Ready Mix K-225 t = 14 cm B. 13.f.2 2.07 M³ 1,513,737.50
gan U24 4.1.1.17.a 394.96 Kg 16,585.25
ing Plat 4.1.1.24.b 29.60 M² 253,676.50
ran Bawah Plat tangga 15/40 4.4.2.4 29.60 M² 71,177.04
gga
Ready Mix K-225 B. 13.f.2 1.12 M³ 1,513,737.50

RAB_Gedung Radiologi dan Laboratorium 285


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
mesh M6 4.1.1.19 223.28 Kg 13,993.65
ing 4.1.1.21.a 7.45 M² 135,487.00
Sub Jumlah V
AAN ATAP
ap Baja Ringan Zincallume 8.1.1.3. 905.04 M2 165,000.00
allume Color t =0,35 mm A.4.5.2.41.b 905.04 M2 235,235.00
tap Zincallume A.4.5.2.42.a 64.20 M 209,930.60
Woodplak 2 lps 8.1.1.4. 125.20 M 110,000.00
Sub Jumlah VI
JUMLAH TOTAL PEKERJAAN STRUKTUR 5
AAN STRUKTUR SELASAR
AAN PENDAHULUAN
Bowplank 2.2.1.4.a 44.00 M' 65,488.50
Sub Jumlah I
AAN PONDASI
n Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 48.00 Btg 1,600,000.00

ngan Mini Pile 25 x 25 K450 288.00 M' 120,000.00


kan Mini Pile 16.00 Titik 40,000.00
nah Pondasi 2.3.1.1 6.66 M³ 90,612.50
asir t = 10 cm 2.3.1.11 0.78 M³ 141,845.00
ja t = 5 cm 4.1.1.4 0.39 M³ 996,598.84
P1
Ready Mix K-300 B. 13.i.2 2.02 M³ 1,682,037.50
gan U32 4.1.1.17.b 219.65 Kg 18,317.75
ing Pondasi 4.1.1.20.a 13.44 M² 135,487.00

RAB_Gedung Radiologi dan Laboratorium 286


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
P2
Ready Mix K-300 B.13.i.2 3.47 M³ 1,682,037.50
gan U32 4.1.1.17.b 296.34 Kg 18,317.75
ing Pondasi 4.1.1.20.a 13.16 M² 135,487.00
ndasi K2 Uk. 30x30 cm
Ready Mix K-225 B. 13.f.2 0.76 M³ 1,513,737.50
gan U32 4.1.1.17.b 325.15 Kg 18,317.75
gan U24 4.1.1.17.a 42.98 Kg 16,585.25
ing Pondasi 4.1.1.20.a 10.08 M² 135,487.00
Sub Jumlah II
AAN STRUKTUR
Lantai 1
20x40 cm
Ready Mix K-225 B. 13.f.2 3.48 M³ 1,513,737.50
gan U32 4.1.1.17.b 486.73 Kg 18,317.75
gan U24 4.1.1.17.a 153.26 Kg 16,585.25
ing Sloof 4.1.1.21.a 46.44 M² 135,487.00
ong Uk.10/50 (blk.20/40)
Ready Mix K-225 B. 13.f.2 1.88 M³ 1,513,737.50
mesh M6 4.1.1.19 94.14 Kg 13,993.65
ing Sloof 4.1.1.21.a 37.63 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 24.20 M² 71,177.04
Uk. 30x30 cm Lt.1
Ready Mix K-225 B. 13.f.2 3.89 M³ 1,513,737.50
gan U32 4.1.1.17.b 682.13 Kg 18,317.75
gan U24 4.1.1.17.a 118.50 Kg 16,585.25
ing Kolom 4.1.1.22 b 51.84 M² 224,636.50
Lantai 2
Dack Uk.15/40 elv. 3.20
Ready Mix K-225 menggunakan pompa B. 13.f.1 2.33 M³ 2,041,737.50
gan U32 4.1.1.17.b 268.11 Kg 18,317.75
gan U24 4.1.1.17.a 92.43 Kg 16,585.25
ing Balok 4.1.1.23.b 29.14 M² 228,085.00
ack elv. 3.3.20
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.64 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 260.71 Kg 13,993.65
ing Lantai 4.1.1.24.b 54.17 M² 253,676.50
ran List Plat Dack elv. 3.20 4.4.2.4 96.62 M² 71,177.04
20x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.59 M³ 2,041,737.50
gan U32 4.1.1.17.b 508.04 Kg 18,317.75

RAB_Gedung Radiologi dan Laboratorium 287


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
gan U24 4.1.1.17.a 158.00 Kg 16,585.25
ing Balok 4.1.1.23.b 47.88 M² 228,085.00
Uk. 30x30 cm (elv.4.00-7.95) Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.27 M³ 2,041,737.50
gan U32 4.1.1.17.b 682.13 Kg 18,317.75
gan U24 4.1.1.17.a 129.56 Kg 16,585.25
ing Kolom 4.1.1.22 b 56.88 M² 224,636.50

20x45 elv.7.95
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.60 M³ 2,041,737.50
gan U32 4.1.1.17.b 62.53 Kg 18,317.75
gan U24 4.1.1.17.a 17.81 Kg 16,585.25
ing Balok 4.1.1.23.b 6.30 M² 228,085.00
20x40 elv.7.95
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.32 M³ 2,041,737.50
gan U32 4.1.1.17.b 459.49 Kg 18,317.75
gan U24 4.1.1.17.a 146.28 Kg 16,585.25
ing Balok 4.1.1.23.b 44.32 M² 228,085.00
elv.7.95
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.34 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 528.76 Kg 13,993.65
ing Lantai 4.1.1.24.b 52.32 M² 253,676.50
ran Plat Dack 4.4.2.4 126.80 M² 71,177.04
Plat Dack 4.4.2.27 63.40 M² 44,682.00
proofing Plat Dack A.4.7.1.10.f 63.40 M² 26,582.05
Sub Jumlah III

RAB_Gedung Radiologi dan Laboratorium 288


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
AAN PLAT LANTAI
i1
Ready Mix K-225 t = 10 cm B. 13.f.2 7.22 M³ 1,513,737.50
mesh 2xM7 4.1.1.19 602.15 Kg 13,993.65
ing Lantai 4.1.1.24.c 60.57 M² 228,613.00
i2
Ready Mix K-225 t = 10 cm menggunakan pompa B. 13.f.1 7.22 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 602.15 Kg 13,993.65
ing Lantai 4.1.1.24.b 60.23 M² 253,676.50
Sub Jumlah IV
AAN ATAP
ap Baja Ringan Zincallume 8.1.1.3. 90.54 M2 165,000.00
allume Color t =0,35 mm A.4.5.2.41.b 90.54 M2 235,235.00
tap Zincallume A.4.5.2.42.a 21.46 M 209,930.60
Woodplak 2 lps 8.1.1.4. 42.80 M 110,000.00
Sub Jumlah V
JUMLAH TOTAL PEKERJAAN STRUKTUR SELASAR
AAN ARSITEKTUR
AAN DINDING

ng Batako A.4.4.1.19.a 1,437.95 m2 102,991.46


eran 1:4 A.4.4.2.4 2,833.10 m2 71,177.04
ng Keramik 20x40 Cm A.4.4.3.54.a 144.25 m2 345,562.80
ng Wastafel Keramik 30x30 Motif A.4.4.3.35.a 1.81 m2 276,870.00
al Pelapis (PB) 2 mm Dinding + Partisi Triplek A.X-Ray 251.32 m2 1,863,000.00

ng Batako A.4.4.1.19.a 1,046.98 m2 102,991.46


eran 1:4 A.4.4.2.4 2,060.27 m2 71,177.04
ng Keramik 20x40 Cm A.4.4.3.54.a 83.98 m2 345,562.80
ng Wastafel Keramik 30x30 Motif A.4.4.3.35.a 113.46 m2 276,870.00

p
ng Batako A.4.4.1.19.a 42.20 m2 102,991.46
eran 1:4 A.4.4.2.4 84.41 m2 71,177.04

ng Batako A.4.4.1.19.a 259.96 m2 102,991.46


eran 1:4 A.4.4.2.4 519.92 m2 71,177.04
Sub Jumlah I 1
AAN LANTAI

RAB_Gedung Radiologi dan Laboratorium 289


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6

ai Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 131.14 m2 391,972.24


ai Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 27.36 m2 394,282.24
ai Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 494.45 m2 394,282.24
ai Keramik 30x30 Cm Polised A.4.4.3.35. 44.29 m2 279,180.00
ai Keramik 30x30 Cm Unpolised A.4.4.3.35.a 27.00 m2 276,870.00
ai Vinyl Homogeneous Heavy Duty A.4.4.3.59.a 175.94 m2 774,779.50
ai Tangga
ntai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 42.39 m2 276,870.00
sing A.4.4.3.41 81.12 m' 84,685.92
ital Plint A.4.4.3.21 623.30 m' 39,715.94

ai Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 103.79 m2 391,972.24


ai Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 17.28 m2 394,282.24
ai Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 589.50 m2 394,282.24
ai Keramik 30x30 Cm Polised A.4.4.3.35 53.17 m2 279,180.00
ai Keramik 30x30 Cm Unpolised A.4.4.3.35.a 25.92 m2 276,870.00
ai Vinyl Homogeneous Heavy Duty A.4.4.3.59.a 71.04 m2 774,779.50
ai Tangga
ntai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 18.05 m2 276,870.00
sing A.4.4.3.41 34.56 m' 84,685.92
ital Plint A.4.4.3.21 513.51 m' 39,715.94
Sub Jumlah II

RAB_Gedung Radiologi dan Laboratorium 290


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
AAN PLAFON

nd Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 674.60 m2 186,751.40


nd GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 26.18 m2 186,351.00
nd Timbal Pelapis (PB) 2 mm + Partisi Gypsum A.X-Ray 115.12 m2 1,863,000.00

nd Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 846.05 m2 186,751.40


nd GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 26.96 m2 186,351.00
Sub Jumlah III
AAN PINTU DAN JENDELA

250 cm (Kaca Tempered Frameless 12mm) U&B 2.00 Unit 17,052,750.00


ACP Gawang U&B 65.41 m2 935,000.00

5x270 cm (Kaca Tempered Frameless 12mm) U&B 2.00 Unit 13,183,087.50

5x270 cm 2.00 Unit


A.4.2.1.11 18.50 m' 109,840.50
Pintu A.4.6.1.8.a 7.05 m2 882,231.58
l Pintu A.4.6.2.5 16.00 Set 35,702.70
andle A.4.6.2.11.a 4.00 Set 120,928.50
lockcase A.4.6.2.1.a 2.00 Set 241,785.50
Stoper A.4.6.2.13 4.00 Set 292,033.50
Closer A.4.6.2.10 4.00 Set 247,384.50
5 mm A.4.6.2.17 1.92 m2 220,227.70

70 cm 4.00 Unit
A.4.2.1.11 29.40 m' 109,840.50
Pintu A.4.6.1.8.a 7.94 m2 882,231.58
l Pintu A.4.6.2.5 16.00 Set 35,702.70
Handle A.4.6.2.11.a 4.00 Set 120,928.50
lockcase A.4.6.2.1.a 4.00 Set 241,785.50
Stoper A.4.6.2.13 4.00 Set 292,033.50
Closer A.4.6.2.10 4.00 Set 247,384.50
5 mm A.4.6.2.17 2.43 m2 220,227.70

70 cm 18.00 Unit
A.4.2.1.11 128.70 m' 109,840.50
Pintu A.4.6.1.8.a 34.65 m2 882,231.58

RAB_Gedung Radiologi dan Laboratorium 291


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
l Pintu A.4.6.2.5 72.00 Set 35,702.70
Handle A.4.6.2.11.a 18.00 Set 120,928.50
lockcase A.4.6.2.1.a 18.00 Set 241,785.50
Stoper A.4.6.2.13 18.00 Set 292,033.50
Closer A.4.6.2.10 18.00 Set 247,384.50
5 mm A.4.6.2.17 7.20 m2 220,227.70

20 cm 1.00 Unit
A.4.2.1.11 5.17 m' 109,840.50
Pintu A.4.6.1.8.a 1.70 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
Closer A.4.6.2.10 1.00 Set 247,384.50

270 cm 1.00 Unit


A.4.2.1.11 7.55 m' 109,840.50
Pintu A.4.6.1.8.a 2.20 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
Closer A.4.6.2.10 1.00 Set 247,384.50
5 mm A.4.6.2.17 0.66 m2 220,227.70

RAB_Gedung Radiologi dan Laboratorium 292


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
270 cm 1.00 Unit
A.4.2.1.11 7.55 m' 109,840.50
Pintu A.4.6.1.8.a 1.85 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
Closer A.4.6.2.10 1.00 Set 247,384.50
5 mm A.4.6.2.17 0.51 m2 220,227.70

80 cm 1.00 Unit
A.4.2.1.11 4.37 m' 109,840.50
Pintu A.4.6.1.8.a 1.23 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
Closer A.4.6.2.10 1.00 Set 247,384.50
5 mm A.4.6.2.17 0.16 m2 220,227.70

00 cm 2.00 Unit
A.4.2.1.11 5.76 m' 109,840.50
Pintu A.4.6.1.8.a 0.88 m2 882,231.58
l Kupu-Kupu A.4.6.2.6 4.00 Set 25,264.25
e : Pull Plate A.4.6.2.11.b 2.00 Set 49,868.50
Pintu Window bolt with key A.4.6.2.4.a 2.00 Set 87,037.50

20 cm 4.00 Unit
A.4.2.1.11 20.80 m' 109,840.50
Pintu A.4.6.1.8.a 6.47 m2 882,231.58
l Pintu A.4.6.2.5 12.00 Set 35,702.70
Handle A.4.6.2.11.a 4.00 Set 120,928.50
lockcase A.4.6.2.1.a 4.00 Set 241,785.50
Stoper A.4.6.2.13 4.00 Set 292,033.50

20 cm 1.00 Unit
A.4.2.1.11 5.10 m' 109,840.50
Pintu A.4.6.1.8.a 1.42 m2 882,231.58
l Pintu A.4.6.2.5 3.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50

RAB_Gedung Radiologi dan Laboratorium 293


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
Stoper A.4.6.2.13 1.00 Set 292,033.50

20 cm 2.00 Unit
A.4.2.1.11 10.60 m' 109,840.50
Pintu A.4.6.1.8.a 3.58 m2 882,231.58
l Pintu A.4.6.2.5 6.00 Set 35,702.70
Handle A.4.6.2.11.a 2.00 Set 120,928.50
lockcase A.4.6.2.1.a 2.00 Set 241,785.50
Stoper A.4.6.2.13 2.00 Set 292,033.50

80 cm 1.00 Unit
A.4.2.1.11 4.50 m' 109,840.50
Pintu A.4.6.1.8.a 1.43 m2 882,231.58
l Pintu A.4.6.2.5 3.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50

220 cm (Lapis Timbal 2mm) 3.00 Unit 57,200,000.00

220 cm (Lapis Timbal 2mm) 2.00 Unit 35,750,000.00

220 cm (Lapis Timbal 2mm + Sangkar Faraday) 1.00 Unit 57,200,000.00

220 cm (Lapis Timbal 2mm) 4.00 Unit 28,600,000.00

RAB_Gedung Radiologi dan Laboratorium 294


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6

0 cm 9.00 Unit
A.4.2.1.11 228.60 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 15.78 m2 566,362.50
5 mm A.4.6.2.17 50.73 m2 220,227.70
ment Handle A.4.6.2.11.b 18.00 Set 49,868.50
n Stay A.4.6.2.9 36.00 Set 33,863.50

0 cm 5.00 Unit
A.4.2.1.11 92.00 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 3.87 m2 566,362.50
5 mm A.4.6.2.17 20.71 m2 220,227.70
ment Handle A.4.6.2.11.b 5.00 Set 49,868.50
n Stay A.4.6.2.9 10.00 Set 33,863.50

70 cm 2.00 Unit
A.4.2.1.11 40.80 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 1.55 m2 566,362.50
5 mm A.4.6.2.17 10.60 m2 220,227.70
ment Handle A.4.6.2.11.b 2.00 Set 49,868.50
n Stay A.4.6.2.9 4.00 Set 33,863.50

0 cm 3.00 Unit
A.4.2.1.11 51.60 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 2.01 m2 566,362.50
5 mm A.4.6.2.17 10.82 m2 220,227.70
ment Handle A.4.6.2.11.b 3.00 Set 49,868.50
n Stay A.4.6.2.9 6.00 Set 33,863.50

0 cm 2.00 Unit
A.4.2.1.11 27.12 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 1.65 m2 566,362.50
5 mm A.4.6.2.17 5.45 m2 220,227.70
ment Handle A.4.6.2.11.b 2.00 Set 49,868.50
n Stay A.4.6.2.9 4.00 Set 33,863.50

0 cm 1.00 Unit
A.4.2.1.11 12.20 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 0.65 m2 566,362.50
5 mm A.4.6.2.17 2.17 m2 220,227.70
ment Handle A.4.6.2.11.b 1.00 Set 49,868.50

RAB_Gedung Radiologi dan Laboratorium 295


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
n Stay A.4.6.2.9 2.00 Set 33,863.50

0 cm 3.00 Unit
A.4.2.1.11 34.68 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 1.71 m2 566,362.50
5 mm A.4.6.2.17 5.73 m2 220,227.70
ment Handle A.4.6.2.11.b 3.00 Set 49,868.50
n Stay A.4.6.2.9 6.00 Set 33,863.50

0 cm 1.00 Unit
A.4.2.1.11 20.32 m' 109,840.50
5 mm A.4.6.2.17 4.35 m2 220,227.70

70 cm (Anti Radiasi) A.RAD.05 1.00 Unit 69,069,000.00

70 cm (Anti Radiasi) A.RAD.05 3.00 Unit 69,069,000.00

cm 3.00 Unit
A.4.2.1.11 7.44 m' 109,840.50
5 mm A.4.6.2.17 1.18 m2 220,227.70

4 cm 12.00 Unit
A.4.2.1.11 53.04 m' 109,840.50
5 mm A.4.6.2.17 9.64 m2 220,227.70

RAB_Gedung Radiologi dan Laboratorium 296


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6

5x270 cm (Kaca Tempered Frameless 12mm) U&B 4.00 Unit 13,183,087.50

5x270 cm 10.00 Unit


A.4.2.1.11 92.50 m' 109,840.50
Pintu A.4.6.1.8.a 35.25 m2 882,231.58
l Pintu A.4.6.2.5 80.00 Set 35,702.70
andle A.4.6.2.11.a 20.00 Set 120,928.50
lockcase A.4.6.2.1.a 10.00 Set 241,785.50
Stoper A.4.6.2.13 20.00 Set 292,033.50
Closer A.4.6.2.10 20.00 Set 247,384.50
5 mm A.4.6.2.17 9.60 m2 220,227.70

70 cm 3.00 Unit
A.4.2.1.11 22.05 m' 109,840.50
Pintu A.4.6.1.8.a 5.95 m2 882,231.58
l Pintu A.4.6.2.5 12.00 Set 35,702.70
Handle A.4.6.2.11.a 3.00 Set 120,928.50
lockcase A.4.6.2.1.a 3.00 Set 241,785.50
Stoper A.4.6.2.13 3.00 Set 292,033.50
Closer A.4.6.2.10 3.00 Set 247,384.50
5 mm A.4.6.2.17 1.82 m2 220,227.70

70 cm 15.00 Unit
A.4.2.1.11 107.25 m' 109,840.50
Pintu A.4.6.1.8.a 28.87 m2 882,231.58
l Pintu A.4.6.2.5 60.00 Set 35,702.70
Handle A.4.6.2.11.a 15.00 Set 120,928.50
lockcase A.4.6.2.1.a 15.00 Set 241,785.50
Stoper A.4.6.2.13 15.00 Set 292,033.50
Closer A.4.6.2.10 15.00 Set 247,384.50
5 mm A.4.6.2.17 6.00 m2 220,227.70

20 cm 1.00 Unit
A.4.2.1.11 5.17 m' 109,840.50
Pintu A.4.6.1.8.a 1.70 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50

RAB_Gedung Radiologi dan Laboratorium 297


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
Closer A.4.6.2.10 1.00 Set 247,384.50

00 cm 2.00 Unit
A.4.2.1.11 5.76 m' 109,840.50
Pintu A.4.6.1.8.a 0.88 m2 882,231.58
l Kupu-Kupu A.4.6.2.6 4.00 Set 25,264.25
e : Pull Plate A.4.6.2.11.b 2.00 Set 49,868.50
Pintu Window bolt with key A.4.6.2.4.a 2.00 Set 87,037.50

20 cm 4.00 Unit
A.4.2.1.11 20.80 m' 109,840.50
Pintu A.4.6.1.8.a 5.90 m2 882,231.58
l Pintu A.4.6.2.5 12.00 Set 35,702.70
Handle A.4.6.2.11.a 4.00 Set 120,928.50
lockcase A.4.6.2.1.a 4.00 Set 241,785.50
Stoper A.4.6.2.13 4.00 Set 292,033.50

20 cm 1.00 Unit
A.4.2.1.11 5.10 m' 109,840.50
Pintu A.4.6.1.8.a 1.31 m2 882,231.58
l Pintu A.4.6.2.5 3.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50

RAB_Gedung Radiologi dan Laboratorium 298


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6

60 cm 8.00 Unit
A.4.2.1.11 150.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 14.03 m2 566,362.50
5 mm A.4.6.2.17 28.44 m2 220,227.70
ment Handle A.4.6.2.11.b 16.00 Set 49,868.50
n Stay A.4.6.2.9 32.00 Set 33,863.50

0 cm 1.00 Unit
A.4.2.1.11 18.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2 566,362.50
5 mm A.4.6.2.17 4.14 m2 220,227.70
ment Handle A.4.6.2.11.b 1.00 Set 49,868.50
n Stay A.4.6.2.9 2.00 Set 33,863.50

0 cm 5.00 Unit
A.4.2.1.11 67.80 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 4.13 m2 566,362.50
5 mm A.4.6.2.17 13.63 m2 220,227.70
ment Handle A.4.6.2.11.b 5.00 Set 49,868.50
n Stay A.4.6.2.9 10.00 Set 33,863.50

60 cm 4.00 Unit
A.4.2.1.11 40.08 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 40.08 m2 566,362.50
5 mm A.4.6.2.17 3.30 m2 220,227.70
ment Handle A.4.6.2.11.b 4.00 Set 49,868.50
n Stay A.4.6.2.9 4.00 Set 33,863.50

0 cm 2.00 Unit
A.4.2.1.11 138.48 m' 109,840.50
8 mm A.4.6.2.18 55.96 m2 512,270.55

5 cm 1.00 Unit
A.4.2.1.11 32.50 m' 109,840.50
5 mm A.4.6.2.17 10.30 m2 220,227.70

cm 4.00 Unit
A.4.2.1.11 9.92 m' 109,840.50
5 mm A.4.6.2.17 1.58 m2 220,227.70

RAB_Gedung Radiologi dan Laboratorium 299


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
4 cm 18.00 Unit
A.4.2.1.11 79.56 m' 109,840.50
5 mm A.4.6.2.17 14.47 m2 220,227.70

40 cm 3.00 Unit
A.4.2.1.11 28.44 m' 109,840.50
8 mm A.4.6.2.18 8.89 m2 512,270.55

20 cm 1.00 Unit
A.4.2.1.11 5.37 m' 109,840.50
Pintu A.4.6.1.8.a 2.14 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
Closer A.4.6.2.10 1.00 Set 247,384.50
Sub Jumlah IV 1
AAN SANITAIR

et Duduk tipe 1 A.5.1.1.1 7.00 set 2,765,675.00


wer Spray A.5.1.1.19.a 7.00 set 332,334.75
Drain A.5.1.1.14 8.00 set 32,901.00
afel wall hung tipe 1 A.5.1.1.5 3.00 set 1,177,616.00

RAB_Gedung Radiologi dan Laboratorium 300


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
afel wall hung tipe 2 A.5.1.1.5.a 9.00 set 1,032,416.00
1 Lubang dengan Petirasan A.5.1.1.12 1.00 set 1,117,110.50
Pantry A.5.1.1.19 1.00 set 95,834.75
bar U&B 3.00 set 468,600.00
bar Difable U&B 3.00 set 3,190,000.00
l Hoek A.5.1.1.1.a 1.00 set 4,973,595.00
Cermin 5 mm ex. Lokal A.4.6.2.20 8.19 m2 531,393.50
Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.11 m3 7,361,243.29

et Duduk tipe 1 A.5.1.1.1 3.00 set 2,765,675.00


wer Spray A.5.1.1.19.a 3.00 set 332,334.75
Drain A.5.1.1.14 5.00 set 32,901.00
afel wall hung tipe 2 A.5.1.1.5.a 10.00 set 1,032,416.00
afel counter top lavatory A.5.1.1.5.a 1.00 set 1,032,416.00
1 Lubang dengan Petirasan A.5.1.1.12 15.00 set 1,117,110.50
Pantry A.5.1.1.19 15.00 set 95,834.75
l Hoek A.5.1.1.1.a 2.00 set 4,973,595.00
Sink A.5.1.1.1.a 1.00 set 4,973,595.00
Cermin 5 mm ex. Lokal A.4.6.2.20 4.68 m2 531,393.50
Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 5.94 m3 7,361,243.29
elekat Bahan Multipleks Fin. HPL 100.04 m' 1,500,000.00
Sub Jumlah V
AAN PENGECATAN

g Luar (weathershield) A.4.7.1.10.b 471.08 m2 29,332.05


g Dalam (easy clean) A.4.7.1.10.a 1,482.81 m2 31,048.05
d A.4.7.1.10.a 981.06 m2 31,048.05

g Luar (weathershield) A.4.7.1.10.b 590.21 m2 29,332.05


g Dalam (easy clean) A.4.7.1.10.a 1,806.22 m2 31,048.05
d A.4.7.1.10.a 770.00 m2 31,048.05

p
g Luar (weathershield) A.4.7.1.10.b 44.22 m2 29,332.05
g Dalam (easy clean) A.4.7.1.10.a 42.20 m2 31,048.05

g Luar (weathershield) A.4.7.1.10.b 619.08 m2 29,332.05


d A.4.7.1.10.a 131.14 m2 31,048.05

RAB_Gedung Radiologi dan Laboratorium 301


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
Sub Jumlah VI
AAN LAIN-LAIN

Tangga :
ndrail dan Railling tangga 1 A.4.2.1.20.a 25.37 m2 457,842.00
ndrail dan Railling tangga 2 A.4.2.1.20.a 22.39 m2 457,842.00
elekat Meja Konter Bahan Multipleks Fin. HPL 5.66 m' 1,500,000.00

Tangga :
ndrail dan Railling ( Void ) A.4.2.1.20.a 23.77 m2 457,842.00
Sub Jumlah VII
TUR FASADE BANGUNAN
Flat Tebal 0.3 mm + Pemasangan U&B 124.68 m2 935,000.00
i Aluminium U&B 79.04 m2 1,036,200.00
age :
ALASI RADIOLOGI 1,033.20 cm 17,400.00
ALASI LABORATORIUM 1,205.40 cm 17,400.00
Sub Jumlah VIII
JUMLAH TOTAL PEKERJAAN ARSITEKTUR 4

RAB_Gedung Radiologi dan Laboratorium 302


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
AAN MEKANIKAL ELEKTRIKAL
Penerangan dan Kotak Kontak Lantai 1 & 2

M 2 x 2.5 mm² dalam High Impact conduit dia. 20 mm


enerangan 151.00 titik 251,112.98
LED Inbow 6 W 14.00 bh 160,000.00
LED Inbow 10 W 58.00 bh 210,000.00
LED Inbow 10 W + Nicad Batery 6.00 bh 864,500.00
LED Inbow 13 W 59.00 bh 256,644.00
LED Inbow 13 W+ Nicad Batery 8.00 bh 929,144.00
d Baret Circular 10 W 6.00 bh 404,375.00
anda 38.00 bh 55,800.00
unggal 15.00 bh 40,455.00
it + baterai 2.00 bh 1,430,000.00
M 3x2.5 mm² dalam High Impact conduit dia. 20 mm
otak kontak 1p 101.00 titik 290,908.00
istrik Door full Hermatik 8.00 titik 290,908.00
ak kontak dinding 1p 99.00 bh 49,600.00
ak kontak lantai 2.00 bh 351,875.00

M 2 x 2.5 mm² dalam High Impact conduit dia. 20 mm


enerangan 163.00 titik 251,112.98
LED Inbow 6 W 4.00 bh 160,000.00
LED Inbow 10 W 34.00 bh 210,000.00
LED Inbow 10 W + Nicad Batery 2.00 bh 914,563.50
LED Inbow 13 W 96.00 bh 256,644.00
LED Inbow 13 W+ Nicad Batery 9.00 bh 939,144.00
d Baret Circular 10 W 18.00 bh 414,375.00
anda 30.00 bh 55,800.00
unggal 10.00 bh 40,455.00
it + baterai 2.00 bh 1,430,000.00
M 3x2.5 mm² dalam High Impact conduit dia. 20 mm
otak kontak 1p 134.00 titik 290,908.00
ak kontak dinding 1p 108.00 bh 49,600.00
ak kontak Universal 9.00 bh 73,237.50
ak kontak lantai 26.00 bh 351,875.00
Grounding Listrik
m 105.00 meter 78,000.00
grounding arus kuat tahanan maksimal 2 ohm 3.00 unit 3,500,000.00
Kabel Feeder

RAB_Gedung Radiologi dan Laboratorium 303


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
RIBUSI PANEL IPRS (Wall mounted) (DIGEDUNG PANEL LV-MDP EKSISTING 1.00 Lot BY OTHER
RIBUSI PANEL RAD & LAB (Wall mounted) Lengkap dengan : set
Ukuran 1200 x 80 x 25 cm 1.00 bh 7,197,700.00
0A - 500A, 36kA, 3P 1.00 bh 6,516,800.00
0A, 18kA, 3P 1.00 bh 1,540,000.00
A, 10kA, 3P 1.00 bh 700,500.00
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 7,5kA, 3P 2.00 bh 653,800.00
3P, 10 kA 1.00 bh 553,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 2,000,000.00
ster tipe 1 3P+N 1.00 bh 4,000,000.00
el + Material bantu 1.00 lot 3,000,000.00

RAB_Gedung Radiologi dan Laboratorium 304


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
RIBUSI PANEL CT SCAN & MRI(Wall mounted) Lengkap dengan : 1.00 set
Ukuran 60 x 80 x 20 cm 1.00 bh 3,531,500.00
0A, 36kA, 3P 1.00 bh 3,080,000.00
0A, 18kA, 3P 2.00 bh 1,540,000.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,500,000.00
ster tipe 1 3P+N 1.00 bh 4,000,000.00
el + Material bantu 1.00 lot 2,000,000.00

PANEL X-RAY (Wall mounted) Lengkap dengan : set


Ukuran 60 x 80 x 20 cm 1.00 bh 3,531,500.00
0A, 18kA, 3P 1.00 bh 1,540,000.00
0A, 18kA, 3P 1.00 bh 1,485,000.00
5A, 18kA, 3P 1.00 bh 1,485,000.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,500,000.00
ster tipe 1 3P+N 1.00 bh 4,000,000.00
el + Material bantu 1.00 lot 2,000,000.00

PANEL LANTAI 1 (Wall mounted)


Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 6kA, 3P 1.00 bh 553,500.00
6kA, 1P 1.00 bh 115,500.00
4,5kA, 1P 1.00 bh 85,500.00
4,5kA, 1P 15.00 bh 85,500.00
4,5kA, 1P 9.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
el + Material bantu 1.00 lot 1,000,000.00
PANEL LANTAI 2 (Wall mounted)
Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00

RAB_Gedung Radiologi dan Laboratorium 305


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 6kA, 3P 1.00 bh 553,500.00
4,5kA, 1P 1.00 bh 85,500.00
4,5kA, 1P 4.00 bh 85,500.00
4,5kA, 1P 12.00 bh 85,500.00
4,5kA, 1P 9.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
el + Material bantu 1.00 lot 1,000,000.00

PANEL AC 1 (Wall mounted)


Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 4,5kA, 1P 8.00 bh 85,500.00
4,5kA, 1P 5.00 bh 85,500.00
4,5kA, 1P 12.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
el + Material bantu 1.00 lot 1,000,000.00

RAB_Gedung Radiologi dan Laboratorium 306


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
PANEL AC 2 (Wall mounted)
Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
A, 10kA, 3P 1.00 bh 700,500.00
6kA, 3P 2.00 bh 553,500.00
A, 4,5kA, 1P 8.00 bh 85,500.00
4,5kA, 1P 7.00 bh 85,500.00
4,5kA, 1P 8.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
el + Material bantu 1.00 lot 1,000,000.00

PANEL PP UPS (Wall mounted)


Ukuran 60 x 80 x 20 cm 1.00 bh 3,531,500.00
0A, 18kA, 3P 1.00 bh 1,485,000.00
A, 4,5kA, 1P 5.00 bh 85,500.00
4,5kA, 1P 21.00 bh 85,500.00
6kA, 3P 2.00 bh 553,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
el + Material bantu 1.00 lot 1,500,000.00

trol pompa air bersih transfer 1.00 bh By Pompa Transfer


trol pompa Booster 1.00 bh By Pompa Booster

der
Y 4 (4 x 150 mm²) (LV-MDP Gedung Eksisting - SDP IPRS ) BY OTHER
FGBY 4 x 185 mm² (SDP IPRS - SDP. CT scan & Mri ) 154.00 m' 1,736,250.00
FGBY 2(4x120) mm² (SDP IPRS - SDP.Rad & lab) 142.00 m' 2,184,000.00
Y 4 x 95 mm² ( SDP. CT scan & Mri - UPS CT SCAN - MESIN CT SCAN) m' BY OTHER
Y 4 x 95 mm² ( SDP. CT scan & Mri - UPS MRI - MESIN MRI) m' BY OTHER
Y 4 x 95 mm² ( SDP.Rad & lab - PP.X-RAY ) 55.00 m' 907,400.00
Y 4 x 50 mm² ( PP.X-RAY - MESIN FLOUROSCOPY ) m' BY OTHER
Y 4 x 35 mm² ( PP.X-RAY - MESIN X-RAY ) m' BY OTHER
Y 4 x 50 mm² ( SDP.Rad & lab - UPS 80KVA- PP.UPS LAB) 74.00 m' 464,750.00
Y 4x10 mm² (SDP.Rad & lab - PP LANTAI 1) 54.00 m' 84,058.00

RAB_Gedung Radiologi dan Laboratorium 307


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
Y 4x10 mm² (SDP.Rad & lab - PP LANTAI 2) 20.00 m' 84,058.00
Y 4x10 mm² (SDP.Rad & lab - PP AC 1) 54.00 m' 84,058.00
Y 4x16 mm² (SDP.Rad & lab - PP AC 2) 20.00 m' 166,400.00
Y 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 1 42.00 m' 25,480.00
Y 4x4 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m' 42,900.00
Y 3x4 mm² (PP LANTAI 2 - POMPA BOOSTER) 102.00 m' 28,860.00
Y 4x4 mm² (PP Lantai 1 - Mamografi) 33.00 m' 42,900.00
Y 3x4 mm² (PP Lantai 1 - Panaromig) 43.00 m' 28,860.00
Y 3x4 mm² (PP LANTAI 2 - P. RO) 72.00 m' 28,860.00
Y 4x4 mm² (PP- AC Lantai 2 - AC LAB 1) 105.00 m' 42,900.00
Y 4x4 mm² (PP- AC Lantai 2 - AC LAB 2) 106.00 m' 42,900.00

g Arus kuat
BC mm² (GROUNDING PENTANAHAN - SDP. CT scan & Mri) 25.00 m' 195,000.00
150 mm² (GROUNDING PENTANAHAN 2 - SDP.Rad & lab) 35.00 m' 214,500.00
50 mm² (GROUNDING PENTANAHAN 3 - PP X-RAY) 25.00 m' 78,000.00
35 mm² (SDP.Rad & lab - UPS 80 KVA - PP.UPS LAB) 74.00 m' 59,800.00
6 mm² (SDP.Rad & lab - PP Lantai 1) 20.00 m' 11,700.00
6 mm² (SDP.Rad & lab - PP Lantai 2) 54.00 m' 11,700.00
6 mm² (SDP.Rad & lab - PP AC 1) 20.00 m' 11,700.00
10 mm² (SDP.Rad & lab - PP AC 2) 54.00 m' 22,100.00
6 mm² (PP lantai 1 - Pompa Transfer AB) 102.00 m' 11,700.00
4 mm² (PP Lantai 1 - DUMB WAITER 1 42.00 m' 10,400.00
4 mm² (PP Lantai 1 - Mamografi) 33.00 m' 10,400.00
4 mm² (PP- AC Lantai 2 - AC LAB 1) 105.00 m' 10,400.00
4 mm² (PP- AC Lantai 2 - AC LAB 2) 106.00 m' 10,400.00

RAB_Gedung Radiologi dan Laboratorium 308


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6

n Kabel Ladder dan Tray

y/cage uk lebar 400 mm x 3000 mm H 100 24.00 m' 345,600.00


y/cage uk lebar 300 mm x 3000 mm H 50 61.00 m' 230,400.00
y/cage uk lebar 200 mm x 3000 mm H 50 + cover 46.00 m' 217,290.00
n 30 cm 4.00 bh 151,110.00
uran 30 cm 2.00 bh 163,875.00
er Ukuran 30 cm 1.00 bh 96,225.00
er Ukuran 20 cm 5.00 bh 106,214.00
4.00 bh 204,585.00
g(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls 2,650,965.30

y/cage uk lebar 300 mm x 3000 mm H 50 54.00 m' 230,400.00


y/cage uk lebar 200 mm x 3000 mm H 50 + cover 12.00 m' 217,290.00
n 30 cm 1.00 bh 151,110.00
uran 30 cm 2.00 bh 163,875.00
er Ukuran 20 cm 2.00 bh 106,214.00
uran 20 cm 1.00 bh 106,214.00
2.00 bh 204,585.00
g(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls 3,223,344.15
ah

y/cage uk lebar 200 mm x 3000 mm H 50 67.00 m' 149,040.00


uran 20 cm 2.00 bh 120,000.00
n 20 cm 1.00 bh 106,214.00
er Ukuran 20 cm 1.00 bh 106,214.00
g(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls 1,570,072.20

y/cage uk lebar 200 mm x 3000 mm H 50 65.00 m' 149,040.00


uran 20 cm 2.00 bh 120,000.00
er Ukuran 20 cm 2.00 bh 106,214.00
n 20 cm 1.00 bh 106,214.00
g(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls 1,266,596.40
Sub Jumlah Instalasi Penerangan & kotak kontak 1
Tata Udara / AC Lantai 1 & 2
C lengkap dengan Bracket, Pipa referigerant & Drain, pengkabelan & supporting
c lantai 1
ower AC 1 Fasa (NYM 3x2.5 mm²) 25.00 titik 431,816.00
oning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 11.00 unit 4,940,000.00

RAB_Gedung Radiologi dan Laboratorium 309


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
oning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 4.00 unit 4,940,000.00
oning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 4.00 unit 5,120,000.00
oning split Kap. 12.500 BTUH / 1 1/2 pk tipe wall mounted 1.00 unit 6,370,000.00
oning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 4.00 unit 8,580,000.00
oning split Kap. 18000 BTUH / 2 pk tipe Ceiling Casette 1.00 unit BY OTHER
p kontak AC 1 phase 25.00 bh 172,000.00
gerant 1/4″ + 3/8″ + Isolasi 190.00 m' 63,920.80
gerant 1/4″ + 1/2″ + Isolasi 60.00 m' 77,145.80
PVC AW 1 1/4" + Isolasi 64.00 m' 51,206.00
PVC AW 1'' + Isolasi 40.00 m' 42,000.00
PVC AW 3/4'' + Isolasi 125.00 m' 38,000.00
c lantai 2
ower AC 1 Fasa (NYM 3x2.5 mm²) 21.00 titik 431,816.00
oning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 7.00 unit 4,940,000.00
oning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 1.00 unit 4,940,000.00
oning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 4.00 unit 5,120,000.00
oning split Kap. 12.500 BTUH / 1 1/2 pk tipe wall mounted 5.00 unit 6,370,000.00
oning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 2.00 unit 8,580,000.00
p kontak AC 1 phase 21.00 bh 172,000.00
gerant 1/4″ + 3/8″ + Isolasi 120.00 m' 63,920.80
gerant 1/4″ + 1/2″ + Isolasi 70.00 m' 77,145.80
PVC AW 1 1/4" + Isolasi 59.00 m' 69,453.00
PVC AW 1'' + Isolasi 72.00 m' 38,862.35
PVC AW 3/4'' + Isolasi 95.00 m' 37,596.30

RAB_Gedung Radiologi dan Laboratorium 310


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
oning split Duct. 60.000 BTUH lengkap 2.00 lot 102,503,000.00
ducting Ruang Lab
duct bahan Polyurethane c/w supporting
25 x 30 cm
25x 60 cm
25 x 80 cm
duct bahan Polyurethane c/w supporting
25 x 30 cm
25x 60 cm
25 x 80 cm
box
AG 500 cfm( 4 buah)
35 500 cfm(4 buah)
amper
ai 1 & 2
ower FAN 1 Fasa (NYM 3x2.5 mm²) 20.00 titik 260,658.00
kelas D dia. 100 mm atau 4" 66.00 m' 117,300.00
m flexible ducting 4 inch 22.00 m' 31,850.00
aust fan Toilet ukuran 20 x 20 cm 6.00 bh 300,000.00
hausth Fan tipe sirocco 50 cfm 11.00 unit 912,680.00
Wall Exchaust FAN 10" kap. 300 CFM 0.4 in wg low noise c/w asesories 9.00 unit 896,000.00
Sub Jumlah Instalasi Pengkondisian Udara / AC
Telephone Lantai 1 & 2
abel ITC 2x0.6mm² dalam High Impact conduit dia. 20 mm
elephone 17.00 titk 420,600.00
Telephone single line 17.00 bh BY OTHER
ephone dinding 1 Pole 17.00 bh 85,000.00
Utama
a PABX kap. 8 co line 32Extention lengkap dengan : 1.00 set BY RUANG OK
t PABX, Power suplai, memory card, Extension card, analog card
ngan & Pemrograman
c/w frame & LSA40 Ext. 1.00 set 4,900,000.00
20x2x0.6mm² (MDF - PABX) 75.00 m' 208,750.00
Sub Jumlah Instalasi Telephone
Fire Alarm Lantai 1 & 2
A 2x1x1.5 mm² dalam High Impact conduit dia. 20 mm
eat Detector type Rate Of Rise (ROR) 69.00 titik 219,500.00
ctor ROR 48.00 bh 192,025.00
tector 21.00 bh 640,640.00
e 6.00 unit 15,000.00
Utama

RAB_Gedung Radiologi dan Laboratorium 311


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
rol Fire Alarm (MCFA) tipe konvensional 10 Zone lengkap dengan peralatan 1.00 unit 14,375,000.00
man MCFA 1.00 unit 4,000,000.00
VA 1.00 ls 5,932,000.00
Sub Jumlah Instalasi Fire Alarm
Kabel Data Komputer Lantai 1 & 2
ot
P Cat 6 dalam High Impact conduit dia. 20 mm
abel Data Wifi 4.00 titik 435,000.00
s Point 802,11n - 2,4GHz/5GHz R11 Meter 4.00 bh 1,665,000.00
otak Kontak untuk Wifi (NYM 3x2,5mm2) 4.00 titik 290,908.00
tak Outbow 4.00 bh 49,600.00
Switch Hub untuk UTP cat 6. kap 8 Port 2.00 bh 3,600,000.00
ower Switch Hub & Kotak Kontak. 2.00 bh 290,908.00
witch/ Hub ke Hub Consentrator Ke eksisting 1.00 titik BY OTHER
Sub Jumlah Instalasi Kabel Data Komputer
CCTV Lantai 1 & 2
AXIAL. RG 59 18AWG BC 95% dengan kabel power dalam High Impact conduit dia. 20 mm
amera CCTV 7.00 titik 460,000.00
lution Dome Camera high resolution lengkap dengan Power adaptor & asesori 7.00 bh 522,600.00
lution In door Box CCD Camera day and night lengkap dengan Power adaptor 1.00 bh 1,355,000.00
utama / Sentral CCTV
CTV lengkap dengan peralatan, pemasangan, pengkabelan & asesories
Kap. 8 Channel C/W Hard Disks 2 terrabyte 1.00 unit 6,492,200.00
r 32 inch 1.00 unit 4,000,000.00
VA 1.00 ls 8,690,000.00
V 1.00 ls 2,000,000.00
Sub Jumlah Instalasi CCTV

RAB_Gedung Radiologi dan Laboratorium 312


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
s, Kotor dan Vent Lantai 1 & 2
AW lengkap dengan fitting, bobokan & Penggantung
2
kelas AW dia. 150 mm atau 6" 51.00 m' 260,524.00
kelas AW dia. 100 mm atau 4" 330.00 m' 135,437.50
kelas AW dia. 80 mm atau 3" 72.00 m' 89,190.75
kelas AW dia. 50 mm atau 2" 48.00 m' 56,562.00
kelas AW dia.32 mm atau 1 1/4" 66.00 m' 41,206.00
Grease trap pelat stainless ukuran (Pxlxt) 50x30x45 cm 1.00 unit 2,812,500.00
mpung infeksius kap. 3 m3 1.00 unit 12,000,000.00

beton & Tutup beton


n penetral logam

mpung(Sumpit) kap. 2,5 m3 1.00 unit 12,500,000.00

beton & Tutup beton


n penetral logam

elup Sewage Kapasitas 100 L/m lengkap dengan instalasi power + aksesoris p 2.00 unit 4,600,800.00
Bio Limbah rumah sakit Kapasitas 2.000 Liter Lengkap dengan 2.00 unit 19,825,000.00
eling pengikat
ngurai dan tablet disinfeksikan
eptictank Bio (dinding Bata) + Tutup Plat besi 1,2 mm unit
ak 30X30 Clean out 4 inci(area lantai 1) 9.00 Lot 750,000.00
nhole dak bak bata/plesteran
4 inci
ci
4 inci (area lantai 2) 6.00 bh 138,281.25
upporting(Gantungan Pipa Besi Siku 50mm, Dynabolt, Mur & baut ) 1.00 lot 8,464,990.50

n & pemasangan sistem IPAL EKSISTING


Sub Jumlah Instalasi Air Bekas, Kotor & Vent
h Lantai 1 & 2
PN 10 lengkap dengan fitting, bobokan & Penggantung
2
PN 10 dia. 50 atau 1 1/2 " (ruang pompa ke roof tank) 90.00 m' 146,756.50
PN 10 dia. 50 atau 1 1/2 " 50.00 m' 146,756.50
PN 10 dia. 40 atau 1 1/4 " 151.00 m' 101,321.00
PN 10 dia. 32 atau 1 " 140.00 m' 69,764.75
PN 10 dia. 25 atau 3/4" 45.00 m' 52,052.00

RAB_Gedung Radiologi dan Laboratorium 313


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
PN 10 dia. 20 atau 1/2" 220.00 m' 38,984.00
e dia. 50 atau 1 1/2 " 2.00 bh 420,000.00
e dia. 40 atau 1 1/4 " 3.00 bh 384,000.00
upporting(Gantungan Pipa Besi Siku 50mm, Dynabolt, Mur & baut ) 1.00 lot 9,063,036.20
RANSFER AIR BERSIH
mpa Transfer air bersih kap. 8m3/jam Total head 40 meter 4 kw (1 Pompa) (len 1.00 set 33,500,000.00
e 1 1/2''
ve 1 1/2''
e 1 1/2''
Gauge
trol pompa air bersih transfer
/Struktur reservoir Ground Water Tank (GWT) kap. 2x40 m3 & rumah pompa 1.00 ls 282,175,000.00

RAB_Gedung Radiologi dan Laboratorium 314


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
IH di AtapSystem Lengkap dengan
Osmosis
mmercial Reverse Osmosis 1.00 set 63,480,000.00
Steel Membrane vessel 4040 Seamless
e Reverse Osmosis 2000gpd
ump Shimizhu 135
steel Frame Hollow 40x40 1,2mm
ultistage Centrifugal
r 5gpm
e 3/4 Bronze
Gauge 5bar
Gauge 15bar
bronze inline 3/4"
auto flushing
20" 1 mikron blue
sure Swicth
C rucika AW before housing membrane
pressure system
ment
e FRP 1054 polypropelene
engan
e FRP 1354 polypropelene Softener
a Filter, P. Silica
ome ( Srilangka )
tener Lewatit
Cartrige 20"
20" 5 mikron blue
20" 1 mikron blue
Pump Maxon multistage
alasi
lum proses
Instalasi filterisasi, pembuangan & limbah
1phase
x40

p
ntroller
Unitec 12gpm w/t alarm

& Protection Lengkap dengan 1.00 set 5,520,000.00


Flushing Valve w/t Timer Sistem
sure alarm indicator Sistem
High pressure sistem w/t Alarm Indicator

RAB_Gedung Radiologi dan Laboratorium 315


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
n place Lengkap dengan 1.00 set 3,714,500.00
Cleaning RO123
valve for cleaning
n Valve Pvc 3/4

Backwash, Rinse valve Lengkap dengan 1.00 set 8,671,000.00


Backwash, Fast rinse and Filter Valve Runxin
3/4 Plastic, pressure release valve
ch pump operation

nt & anti fouling Lengkap dengan 1.00 set 6,704,500.00


ump Solenoid Drive Tacmina
nti fouling chemical
ipe pvc 3/4"
oster Stainless Steel air bersih kap. 5 m3/h Total head 50 meter 0,83 Kw leng 3.00 set 10,891,986.00
1.00 set 1,250,000.00
e 1 1/2 '' 5.00 bh 420,000.00
Stainless Steel kap. 2,000 liter ukuran : dia. 1,45 meter tinggi 1,5meter (RO) 1.00 unit 15,400,000.00
Stainless Steel kap. 1,000 liter ukuran : dia. 0,99 meter tinggi 1,45meter (RO) 2.00 unit 7,700,000.00
Fiber kap. 2000 liter ukuran : dia. 1.45 tinggi 1.5 meter lengkap dengan perala 2.00 unit 6,055,577.50
el Control 2.00 unit 850,000.00
mpa Booster air bersih kap. 5m3 Total head 40 meter 0,816 Kw lengkap dengan 1.00 unit 14,916,600.00
Sub Jumlah Instalasi Air Bersih

RAB_Gedung Radiologi dan Laboratorium 316


KODE HARGA SATUAN
URAIAN PEKERJAAN VOLUME SAT SUB J
ANALISA (Rp.)

2 3 4 5 6
ulangan Kebakaran
guisher kap. 3 Kg Klass ABC tipe CO2 6.00 unit 1,864,000.00
Sub Jumlah Instalasi Penanggulangan Kebakaran
air hujan
kelas AW dia. 150 mm atau 6" 115.00 m' 260,524.00
kelas AW dia. 100 mm atau 4" 105.00 m' 135,437.50
n dia. 100 mm atau 4" 7.00 bh 497,950.00
upporting 1.00 lot 3,541,317.50
ainase tipe terbuka lengkap dengan : m' By Sipil
ol 50X50 bh By Sipil
Sub Jumlah Instalasi Saluran Air Hujan
ter
er Kapasitas 100 Kg 2 lantai Termasuk Biaya ongkos kirim & jasa 1.00 unit 132,300,000.00
ox 700(w) x 700(D) x 800(H)
sipil Untuk Dumb waiter (beam,wp,baja & asseories) 1.00 lot 30,000,000.00
Sub Jumlah Instalasi Dumbwaiter
JUMLAH TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL 2

RAB_Gedung Radiologi dan Laboratorium 317


PERHITUNGAN VOLUME
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME

A. PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank
44.400 mx 2.000 ss= 88.800 m
19.600 mx 2.000 ss= 39.200 m

128.000 m

2 Pembongkaran

3 Pagar Sementara 60.000 mx 2.000 ss= 120.000 m


25.700 mx 2.000 ss= 51.400 m

171.400 m

B. PEKERJAAN PONDASI unit ttk btg pjg =3btg x 6 m


1 Pengadaan Mini Pile 20 x 20 P1 x 1.000 x 3.000 = - btg
P2 4.000 x 2.000 x 3.000 = 24.000 btg
P3 2.000 x 3.000 x 3.000 = 18.000 btg
P4 10.000 x 4.000 x 3.000 = 120.000 btg
P6 2.000 x 6.000 x 3.000 = 36.000 btg
P7 4.000 x 7.000 x 3.000 = 84.000 btg
P9 5.000 x 9.000 x 3.000 = 135.000 btg
P12 5.000 x 12.000 x 3.000 = 180.000 btg

32.000 cek dgn detail 597.000 btg

2 Pemancangan Mini Pile 20 x 20 unit ttk m'


P1 - x 1.000 x 18.000 = - m
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
P2 4.000 x 2.000 x 18.000 = 144.000 m
P3 2.000 x 3.000 x 18.000 = 108.000 m
P4 10.000 x 4.000 x 18.000 = 720.000 m
P6 2.000 x 6.000 x 18.000 = 216.000 m
P7 4.000 x 7.000 x 18.000 = 504.000 m
P9 5.000 x 9.000 x 18.000 = 810.000 m
P12 5.000 x 12.000 x 18.000 = 1,080.000 m

32.000 3,582.000 m

3 Pembobokan Mini Pile unit ttk bh


P1 - x 1.000 x 1.000 = - bh
P2 4.000 x 2.000 x 1.000 = 8.000 bh
P3 2.000 x 3.000 x 1.000 = 6.000 bh
P4 10.000 x 4.000 x 1.000 = 40.000 bh
P6 2.000 x 6.000 x 1.000 = 12.000 bh
P7 4.000 x 7.000 x 1.000 = 28.000 bh
P9 5.000 x 9.000 x 1.000 = 45.000 bh
P12 5.000 x 12.000 x 1.000 = 60.000 bh

32.000 199.000 bh

4 Galian Tanah Pondasi P1 - x 0.600 mx 0.600 mx 0.85 m= -


P2 4.000 x 0.800 mx 1.550 mx 0.85 m= 4.216
P3 2.000 x 2.240 m2x 0.850 m= 3.808
P4 10.000 x 1.550 mx 1.550 mx 0.85 m= 20.421
P6 2.000 x 2.300 mx 1.550 mx 0.85 m= 6.061
P7 4.000 x 2.300 mx 2.300 mx 0.85 m= 17.986
P9 5.000 x 2.300 mx 2.300 mx 0.85 m= 22.483
P12 5.000 x 3.050 mx 2.300 mx 0.85 m= 29.814

32.000 104.788
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
5 Urugan Pasir t = 10 cm P1 - x 0.600 mx 0.600 mx 0.1 m= -
P2 4.000 x 0.800 mx 1.550 mx 0.1 m= 0.496
P3 2.000 x 2.240 m2x 0.100 m= 0.448
P4 10.000 x 1.550 mx 1.550 mx 0.1 m= 2.403
P6 2.000 x 2.300 mx 1.550 mx 0.1 m= 0.713
P7 4.000 x 2.300 mx 2.300 mx 0.1 m= 2.116
P9 5.000 x 2.300 mx 2.300 mx 0.1 m= 2.645
P12 5.000 x 3.050 mx 2.300 mx 0.1 m= 3.508

32.000 12.328

6 Lantai Kerja t = 5 cm P1 - unitx 0.600 mx 0.600 mx 0.05 m= -


P2 4.000 unitx 0.800 mx 1.550 mx 0.05 m= 0.248
P3 2.000 unitx 2.240 m2x 0.050 m= 0.224
P4 10.000 unitx 1.550 mx 1.550 mx 0.05 m= 1.201
P6 2.000 unitx 2.300 mx 1.550 mx 0.05 m= 0.357
P7 4.000 unitx 2.300 mx 2.300 mx 0.05 m= 1.058
P9 5.000 unitx 2.300 mx 2.300 mx 0.05 m= 1.323
P12 5.000 unitx 3.050 mx 2.300 mx 0.05 m= 1.754

32.000 6.164

7 Poer Type P2
beton 4.000 unitx 0.800 mx 1.550 mx 0.700 m= 3.472

D.13 6.000 bhx 4.350 mx 1.042 = 27.196 kg


11.000 bhx 2.850 mx 1.042 = 32.667 kg
3.000 bhx 4.550 mx 1.042 = 14.223 kg

74.086 kgx 4.000

bekisting 0.800 mx 0.700 mx 2.000 ssx 4.000 = 4.480


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
1.550 mx 0.700 mx 2.000 ssx 4.000 = 8.680

13.160

7 Poer Type P3 2.000 unitx 2.240 m2x 0.700 m= 3.136 m3

dia.13 1.000 bhx 4.350 mx 1.042 = 4.533 kg


1.000 bhx 4.350 mx 1.042 = 4.533 kg
1.000 bhx 4.350 mx 1.042 = 4.533 kg
6.000 bhx 4.350 mx 1.042 = 27.196 kg
- 8.000 bhx 4.350 mx 1.042 = 36.262 kg
1.000 bhx 4.050 mx 1.042 = 4.220 kg
1.000 bhx 3.550 mx 1.042 = 3.699 kg
1.000 bhx 3.060 mx 1.042 = 3.189 kg
- 3.000 bhx 5.650 mx 1.042 = 17.662 kg

105.826 kgx 2.000

bekisting 5.700 mx 0.700 mx 2.000 = 7.980 m2


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME

7 Poer Type P4
beton 10.000 unitx 1.550 mx 1.550 mx 0.700 m= 16.818

D.13 11.000 bhx 6.050 mx 1.042 = 69.345 kg


11.000 bhx 6.050 mx 1.042 = 69.345 kg
3.000 bhx 6.000 mx 1.042 = 18.756 kg

157.446 kgx 10.000

bekisting 1.550 mx 0.700 mx 2.000 ssx 10.000 = 21.700


1.550 mx 0.700 mx 2.000 ssx 10.000 = 21.700

43.400

7 Poer Type P6
beton 2.000 unitx 2.300 mx 1.550 mx 0.700 m= 4.991

D.13 11.000 bhx 5.850 mx 1.042 = 67.053 kg


16.000 bhx 4.350 mx 1.042 = 72.523 kg
3.000 bhx 7.500 mx 1.042 = 23.445 kg

163.021 kgx 2.000

bekisting 2.300 mx 0.700 mx 2.000 ssx 2.000 = 6.440


1.550 mx 0.700 mx 2.000 ssx 2.000 = 4.340

10.780

7 Poer Type P7
beton 4.000 unitx 2.300 mx 2.300 mx 0.700 m= 14.812

D.13 16.000 bhx 5.850 mx 1.042 = 97.531 kg


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
16.000 bhx 5.850 mx 1.042 = 97.531 kg
3.000 bhx 9.000 mx 1.042 = 28.134 kg

223.196 kgx 4.000

bekisting 2.300 mx 0.700 mx 2.000 ssx 4.000 = 12.880


2.300 mx 0.700 mx 2.000 ssx 4.000 = 12.880

25.760

7 Poer Type P9
beton 5.000 unitx 2.300 mx 2.300 mx 0.700 m= 18.515

D.13 16.000 bhx 5.850 mx 1.042 = 97.531 kg


16.000 bhx 5.850 mx 1.042 = 97.531 kg
3.000 bhx 9.000 mx 1.042 = 28.134 kg

223.196 kgx 5.000

bekisting 2.300 mx 0.700 mx 2.000 ssx 5.000 = 16.100


2.300 mx 0.700 mx 2.000 ssx 5.000 = 16.100

32.200

7 Poer Type P12


beton 5.000 unitx 3.050 mx 2.300 mx 0.700 m= 24.553

D.13 16.000 bhx 7.350 mx 1.042 = 122.539 kg


21.000 bhx 5.850 mx 1.042 = 128.010 kg
3.000 bhx 10.500 mx 1.042 = 32.823 kg

283.372 kgx 5.000


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
bekisting 3.050 mx 0.700 mx 2.000 ssx 5.000 = 21.350
2.300 mx 0.700 mx 2.000 ssx 5.000 = 16.100

37.450

1 Kolom Pondasi K1 Uk. 45x45 cm beton 0.450 x 0.450 x 0.700 mx 30.000 unit= 4.253

D19 2.230 12 D19 12.000 x 2.145 mx 2.230 x 30.000 = 1,722.006


d10 0.617
dia.10-150 0.700 + 1.000 = 5.667 x 1.600 x 0.617
0.150

bekisting 0.450 mx 0.700 mx 4.000 ssx 30.000 = 37.800

C. PEKERJAAN STRUKTUR
1 Sloof Uk. 35x60 cm
- Beton Ready Mix K-225
- 44.450 mx 4.000 bh= 177.800 m
I 19.450 mx 7.000 bh= 136.150 m

313.950 m- 20.000 = 293.950


dikurang :
klm 45/45 0.450 mx 30.000 = 13.500 m
25/50 0.250 mx 26.000 = 6.500 m
20.000
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
- Tulangan U32 11 D.22 11.000 x 313.950 x 2.980 = 10,291.281 kg

- Tulangan U24 dia.10-150 293.950 + 1.000 = 1,960.667 x 1.700 x 0.617


0.150

- Bekisting Sloof 293.950 mx 0.350 m= 102.883 m2


293.950 mx 0.500 m= 146.975 m2
293.950 mx 0.500 m= 146.975 m2

396.833 m2

1 Sloof Uk. 25x50 cm


- Beton Ready Mix K-225
- 44.350 mx 2.000 bh= 88.700 m
I 19.350 mx 5.000 bh= 96.750 m

185.450 m- 2.500 = 182.950

- Tulangan U32 8 D.16 8.000 x 185.450 x 1.579 = 2,342.604 kg

- Tulangan U24 dia.8-150 182.950 + 1.000 = 1,220.667 x 1.300 x 0.395


0.150

- Bekisting Sloof 182.950 mx 0.250 m= 45.738 m2


182.950 mx 0.400 m= 73.180 m2
182.950 mx 0.400 m= 73.180 m2

192.098 m2

1 Sloof Uk. 20x40 cm


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
- Beton Ready Mix K-225
- 4.075 mx 2.000 bh= 8.150 m
I 3.300 mx 1.000 bh= 3.300 m
2.575 mx 6.000 bh= 15.450 m
0.835 mx 4.000 bh= 3.340 m
- 3.650 mx 1.000 bh= 3.650 m
3.950 mx 1.000 bh= 3.950 m

37.840 m- 3.600 = 34.240


dikurang :
klm 45/45 0.450 mx 8.000 = 3.600 m

3.600

- Tulangan U32 5 D16 5.000 x 37.840 x 1.579 = 298.747 kg

- Tulangan U24 dia.8-150 34.240 + 1.000 = 229.267 x 1.000 x 0.395


0.150

- Bekisting Sloof 34.240 mx 0.200 m= 6.848 m2


34.240 mx 0.300 m= 10.272 m2
34.240 mx 0.300 m= 10.272 m2

27.392 m2

1 Sloof Uk. 15x40 cm


- Beton Ready Mix K-225
- 4.300 mx 2.000 bh= 8.600 m
I 1.750 mx 2.000 bh= 3.500 m

12.100 m- - = 12.100

- Tulangan U32 4 D.16 4.000 x 12.100 x 1.579 = 76.424 kg


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
- Tulangan U24 8 dia.150 12.100 + 1.000 = 81.667 x 0.900 x 0.395
0.150

- Bekisting Sloof 12.100 mx 0.150 m= 1.815 m2


12.100 mx 0.300 m= 3.630 m2
12.100 mx 0.300 m= 3.630 m2

9.075 m2

1 Tutup Kolong Uk.10x30 cm (blk.35/60)


- Beton Ready Mix K-225 66.250 mx 1.000 = 66.250 m
57.250 mx 1.000 = 57.250 m

123.500 m- 8.100 = 115.400


tinggi balok+tutup kolong
- Wiremesh M6 115.400 mx 0.400 mx 1.000 lpsx 4.170 = 192.487

- Bekisting Sloof 115.400 mx 0.300 mx 2.000 ss= 69.240 m2

- Plesteran Tutup Kolong Uk.10x30 cm (blk.35/60) 123.500 mx 0.400 m= 49.400 m2

3 Tutup Kolong Uk.10/50 (blk.20/40)


- Beton Ready Mix K-225 4.075 mx 2.000 = 8.150 m

8.150 m- 0.900 = 7.250


tinggi balok+tutup kolong
- Wiremesh M6 7.250 mx 0.600 mx 1.000 lpsx 4.170 = 18.140

- Bekisting Sloof 7.250 mx 0.500 mx 2.000 ss= 7.250 m2


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) 8.150 mx 0.600 m= 4.890 m2

1 Kolom K1 Uk. 45x45 cm Lt.1 beton 0.450 x 0.450 x 3.400 mx 30.000 unit= 20.655

D19 2.230 12 D19 12.000 x 4.500 mx 2.230 kg/mx 30.000 = 3,612.600


d10 0.617
dia.10-150 3.400 + 1.000 = 23.667 x 1.600 x 0.617
0.150

bekisting 0.450 mx 3.400 mx 4.000 ssx 30.000 = 183.600

- Plesteran Kolom Uk. 45x45 Lt.1 2 ss 0.450 mx 3.400 mx 4.000 ss= 6.120 m2- 3.060
1 ss 0.450 mx 3.400 mx 4.000 ss= 6.120 m2- 4.590

1 Kolom K2 Uk. 30x30 cm Lt.1


beton 0.300 x 0.300 x 3.600 mx 2.000 unit= 0.648

2.230 8 d.16 8.000 x 4.500 mx 1.579 x 2.000 = 113.688


0.617
dia.8-150 3.600 + 1.000 = 25.000 x 1.000 x 0.395
0.150

bekisting 0.300 mx 3.600 mx 4.000 ssx 2.000 = 8.640

- Plesteran Kolom Uk. 30x30 Lt.1 4 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- -
3 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 1.080
2 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 2.160
1 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 3.240
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME

1 Kolom K3 Uk. 20x20 cm Lt.1


beton 0.200 x 0.200 x 3.600 mx 1.000 unit= 0.144

2.230 4 d.16 8.000 x 4.500 mx 1.579 x 1.000 = 56.844


0.617
dia.8-150 3.600 + 1.000 = 25.000 x 0.600 x 0.395
0.150

bekisting 0.200 mx 3.600 mx 4.000 ssx 1.000 = 2.880

- Plesteran Kolom Uk. 20x20 Lt.1 1 ss 0.200 mx 3.600 mx 4.000 ss= 2.880 m2- 2.160

2 Kolom Praktis Uk.9x9 cm Lt.1


- Beton K100 0.090 mx 0.090 mx 3.600 mx 217.000 bh= 6.328

- Tulangan U24 4 dia,8 4.000 x 3.600 x 0.395 x 217.000


dia.8-150 3.600 + 1.000 = 25.000 x 0.160 x 0.395
0.150

- Bekisting 0.090 mx 3.600 mx 1.000 ssx 217.000 = 70.308

3 Balok Praktis Uk.9x9 cm Lt.1 dnd 7.600 x 3.000 = 22.800 m


- Beton K100 3.880 x 4.000 = 15.520 m
4.000 x 3.000 = 12.000 m
7.600 x 1.000 = 7.600 m

57.920 mx 0.090 x 0.090


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
- Tulangan U24 4 dia,8 4.000 x 57.920 x 0.395
dia.8-150 57.920 + 1.000 = 387.133 x 0.160 x 0.395
0.150

- Bekisting 0.090 mx 57.920 mx 1.000 = 5.213 m2

Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.360
- Beton Ready Mix K-225
- 28.450 mx 1.000 bh= 28.450 m
44.450 mx 1.000 bh= 44.450 m
4.075 mx 2.000 bh= 8.150 m
I 13.275 mx 1.000 bh= 13.275 m
5.450 mx 1.000 bh= 5.450 m
2.275 mx 3.000 bh= 6.825 m
8.450 mx 1.000 bh= 8.450 m

115.050 m- 9.000 = 106.050


dikurang :
klm 45/45 0.450 mx 20.000 = 9.000 m

9.000

- Tulangan U32 4 D.16 4.000 x 115.050 x 1.579 = 726.656 kg


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
- Tulangan U24 dia.8-150 106.050 + 1.000 = 708.000 x 0.900 x 0.395
0.150

- Bekisting Balok 106.050 mx 0.150 m= 15.908 m2


106.050 mx 0.300 m= 31.815 m2
106.050 mx 0.300 m= 31.815 m2

79.538 m2

1 List Plat Dack elv. 3.110


- Beton Ready Mix K-225 - 28.450 mx 1.000 bh= 28.450 m
44.450 mx 1.000 bh= 44.450 m
4.075 mx 2.000 bh= 8.150 m
I 13.275 mx 1.000 bh= 13.275 m
5.450 mx 1.000 bh= 5.450 m
2.275 mx 3.000 bh= 6.825 m
8.450 mx 1.000 bh= 8.450 m

106.425 m 115.050 m2x 0.100 m= 12.569

- Wiremesh 2xM6 106.425 mx 0.800 m= 85.140 m2

85.140 m2x 2.000 lpsx 4.170

- Bekisting Lantai 115.050 m2x 1.000 = 115.050 m2


106.425 mx 0.300 m= 31.928 m2

146.978 m2

- Plesteran Plat Dack Uk.15/40 elv. 3.360 115.050 m2x 2.000 ss= 230.100 m2
106.425 mx 0.300 m= 31.928 m2

262.028 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME

1 Balok Uk. 35x60 cm Lt.2


- Beton Ready Mix K-225
- 44.450 mx 4.000 bh= 177.800 m
I 19.450 mx 7.000 bh= 136.150 m

313.950 m- 22.050 = 291.900


dikurang :
klm 45/45 0.450 mx 30.000 = 13.500 m
20/40 0.200 mx 4.000 = 0.800 m
25/50 0.250 mx 31.000 = 7.750 m
22.050

- Tulangan U32 11 D.22 11.000 x 313.950 x 2.980 = 10,291.281 kg

- Tulangan U24 dia.10-150 291.900 + 1.000 = 1,947.000 x 1.700 x 0.617


0.150

- Bekisting Balok 291.900 mx 0.350 m= 102.165 m2


291.900 mx 0.500 m= 145.950 m2
291.900 mx 0.500 m= 145.950 m2

394.065 m2

- Plesteran Balok 35x60 cm Lt.2 7.300 mx 1.000 = 7.300 m


8.200 mx 1.000 = 8.200 m
57.450 mx 1.000 = 57.450 m
7.550 mx 1.000 = 7.550 m
27.600 mx 1.000 = 27.600 m
10.500 mx 1.000 = 10.500 m

118.600 m- 6.750 = 111.850


NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
1 Balok Uk. 25x50 cm Lt.2
- Beton Ready Mix K-225
- 40.350 mx 2.000 bh= 80.700 m
I 19.350 mx 5.000 bh= 96.750 m

177.450 m- 2.500 = 174.950

- Tulangan U32 8 D.16 8.000 x 177.450 x 1.579 = 2,241.548 kg

- Tulangan U24 dia.8-150 174.950 + 1.000 = 1,167.333 x 1.300 x 0.395


0.150

- Bekisting Balok 174.950 mx 0.250 m= 43.738 m2


174.950 mx 0.400 m= 69.980 m2
174.950 mx 0.400 m= 69.980 m2

183.698 m2

1 Balok Uk. 20x40 cm Lt.2


- Beton Ready Mix K-225
- 7.975 mx 1.000 bh= 7.975 m
4.075 mx 1.000 bh= 4.075 m
4.400 mx 1.000 bh= 4.400 m
I 5.275 mx 1.000 bh= 5.275 m
3.300 mx 1.000 bh= 3.300 m
2.275 mx 6.000 bh= 13.650 m
0.885 mx 8.000 bh= 7.080 m

45.755 m- 3.600 = 42.155


dikurang :
klm 45/45 0.450 mx 8.000 = 3.600 m
30/30 0.300 mx 2.000 = m
3.600
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
- Tulangan U32 5 D.16 5.000 x 45.755 x 1.579 = 361.236 kg

- Tulangan U24 dia.8-150 42.155 + 1.000 = 282.033 x 1.000 x 0.395


0.150

- Bekisting Balok 42.155 mx 0.200 m= 8.431 m2


42.155 mx 0.300 m= 12.647 m2
42.155 mx 0.300 m= 12.647 m2

33.724 m2

- Plesteran Balok Uk. 20x40 cm Lt.2 4.400 m


4.350 m

8.750 mx 5.100 m= 3.650 mx 0.400 m= 1.460

1 Balok Uk. 15x40 cm Lt.2


- Beton Ready Mix K-225
- 4.300 mx 2.000 bh= 8.600 m
I 1.700 mx 2.000 bh= 3.400 m

12.000 m- - = 12.000

- Tulangan U32 4 D.16 4.000 x 12.000 x 1.579 = 75.792 kg

- Tulangan U24 8 dia.150 12.000 + 1.000 = 81.000 x 0.900 x 0.395


0.150

- Bekisting Sloof 12.000 mx 0.150 m= 1.800 m2


12.000 mx 0.300 m= 3.600 m2
12.000 mx 0.300 m= 3.600 m2

9.000 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME

2 Kolom K1 Uk. 45x45 cm Lt.2 beton 0.450 x 0.450 x 3.450 mx 30.000 unit= 20.959

12 D19 12.000 x 4.000 mx 2.230 kg/mx 30.000 = 3,211.200

dia.10-150 3.450 + 1.000 = 24.000 x 1.600 x 0.617


0.150

bekisting 0.450 mx 3.450 mx 4.000 ssx 30.000 = 186.300

- Plesteran Kolom Uk. 45x45 Lt.2 2 ss 0.450 mx 3.450 mx 4.000 ss= 6.210 m2- 3.105
1 ss 0.450 mx 3.450 mx 4.000 ss= 6.210 m2- 4.658
4 ss 0.450 mx 3.450 mx 4.000 ss= 6.210 m2- -

1 Kolom K2 Uk. 30x30 cm Lt.2


beton 0.300 x 0.300 x 3.600 mx 2.000 unit= 0.648

8 d.16 8.000 x 4.500 mx 1.579 x 2.000 = 113.688

dia.8-150 3.600 + 1.000 = 25.000 x 1.000 x 0.395


0.150

bekisting 0.300 mx 3.600 mx 4.000 ssx 2.000 = 8.640

- Plesteran Kolom Uk. 30x30 Lt.2 4 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- -
3 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 1.080
2 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 2.160
1 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 3.240
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME

1 Kolom Praktis Uk.9x9 cm Lt.2


- Beton K100 0.090 mx 0.090 mx 3.600 mx 170.000 bh= 4.957

- Tulangan U24 4 dia,8 4.000 x 3.600 x 0.395 x 170.000


dia.8-150 3.600 + 1.000 = 25.000 x 0.160 x 0.395
0.150

- Bekisting 0.090 mx 3.600 mx 1.000 ssx 170.000 = 55.080

2 Balok Praktis Uk.9x9 cm Lt.2 dnd 7.600 x 1.000 = 7.600 m


- Beton K100 4.700 x 5.000 = 23.500 m
7.880 x 6.000 = 47.280 m
- 3.800 x 2.000 = 7.600 m

85.980 mx 0.090 x 0.090

- Tulangan U24 4 dia,8 4.000 x 85.980 x 0.395


dia.8-150 85.980 + 1.000 = 574.200 x 0.160 x 0.395
0.150

- Bekisting 0.090 mx 85.980 mx 1.000 = 7.738 m2

elv.4.500
1 Balok Uk. 15x40 cm elv.4.5
- Beton Ready Mix K-225
40.450 mx 2.000 bh= 80.900 m

80.900 m- 5.400 = 75.500


dikurang :
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
klm 45/45 0.450 mx 12.000 = 5.400 m

elv.4.800 5.400

- Tulangan U32 4 D.16 4.000 x 80.900 x 1.579 = 510.964 kg

- Tulangan U24 dia.8-150 75.500 + 1.000 = 504.333 x 0.900 x 0.395


0.150

- Bekisting Balok 75.500 mx 0.150 m= 11.325 m2


75.500 mx 0.300 m= 22.650 m2
75.500 mx 0.300 m= 22.650 m2

56.625 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME

- Plesteran Balok Uk. 15x40 cm elv.4.8 7.550 mx 2.000 = 15.100 m

15.100 mx 0.400 m= 6.040

2 Kolom Praktis Uk.9x9 cm elv.4.8


- Beton K100 0.090 mx 0.090 mx 0.800 mx 48.000 bh= 0.311

- Tulangan U24 4 dia,8 4.000 x 0.800 x 0.395 x 48.000


dia.8-150 0.800 + 1.000 = 6.333 x 0.160 x 0.395
0.150

- Bekisting 0.090 mx 0.800 mx 2.000 ssx 48.000 = 6.912

2 List Plat Dack elv. 4.8


- Beton Ready Mix K-250 16.200 mx 4.000 bh= 64.800 m

64.800 mx 0.585 mx 0.100

- Wiremesh 2xM6 64.800 mx 0.735 mx 2.000 x 4.170 = 397.218

- Bekisting Lantai 64.800 mx 0.585 m= 37.908 m2


64.800 mx 0.300 m= 19.440 m2

57.348 m2

- Plesteran List Plat Dack elv. 4.8 64.800 mx 0.585 mx 2.000 ss= 75.816 m2
21.220 mx 0.300 mx 4.000 bh= 25.464 m2

101.280 m2

elv.7.20
PERHITUNGAN VOLUME
PERHITUNGAN VOLUME

44.400 mx 2.000 ss= 88.800 m


19.600 mx 2.000 ss= 39.200 m

128.000 m

60.000 mx 2.000 ss= 120.000 m


25.700 mx 2.000 ss= 51.400 m

171.400 m

unit ttk btg pjg =3btg x 6 m


x 1.000 x 3.000 = - btg
4.000 x 2.000 x 3.000 = 24.000 btg
2.000 x 3.000 x 3.000 = 18.000 btg
10.000 x 4.000 x 3.000 = 120.000 btg
2.000 x 6.000 x 3.000 = 36.000 btg
4.000 x 7.000 x 3.000 = 84.000 btg
5.000 x 9.000 x 3.000 = 135.000 btg
5.000 x 12.000 x 3.000 = 180.000 btg

32.000 cek dgn detail 597.000 btg

unit ttk m'


- x 1.000 x 18.000 = - m
PERHITUNGAN VOLUME
4.000 x 2.000 x 18.000 = 144.000 m
2.000 x 3.000 x 18.000 = 108.000 m
10.000 x 4.000 x 18.000 = 720.000 m
2.000 x 6.000 x 18.000 = 216.000 m
4.000 x 7.000 x 18.000 = 504.000 m
5.000 x 9.000 x 18.000 = 810.000 m
5.000 x 12.000 x 18.000 = 1,080.000 m

32.000 3,582.000 m

unit ttk bh
- x 1.000 x 1.000 = - bh
4.000 x 2.000 x 1.000 = 8.000 bh
2.000 x 3.000 x 1.000 = 6.000 bh
10.000 x 4.000 x 1.000 = 40.000 bh
2.000 x 6.000 x 1.000 = 12.000 bh
4.000 x 7.000 x 1.000 = 28.000 bh
5.000 x 9.000 x 1.000 = 45.000 bh
5.000 x 12.000 x 1.000 = 60.000 bh

32.000 199.000 bh

- x 0.600 mx 0.600 mx 0.85 m= - m3


4.000 x 0.800 mx 1.550 mx 0.85 m= 4.216 m3
2.000 x 2.240 m2x 0.850 m= 3.808 m3
10.000 x 1.550 mx 1.550 mx 0.85 m= 20.421 m3
2.000 x 2.300 mx 1.550 mx 0.85 m= 6.061 m3
4.000 x 2.300 mx 2.300 mx 0.85 m= 17.986 m3
5.000 x 2.300 mx 2.300 mx 0.85 m= 22.483 m3
5.000 x 3.050 mx 2.300 mx 0.85 m= 29.814 m3

32.000 104.788 m3
PERHITUNGAN VOLUME
PERHITUNGAN VOLUME
- x 0.600 mx 0.600 mx 0.1 m= - m3
4.000 x 0.800 mx 1.550 mx 0.1 m= 0.496 m3
2.000 x 2.240 m2x 0.100 m= 0.448 m3
10.000 x 1.550 mx 1.550 mx 0.1 m= 2.403 m3
2.000 x 2.300 mx 1.550 mx 0.1 m= 0.713 m3
4.000 x 2.300 mx 2.300 mx 0.1 m= 2.116 m3
5.000 x 2.300 mx 2.300 mx 0.1 m= 2.645 m3
5.000 x 3.050 mx 2.300 mx 0.1 m= 3.508 m3

32.000 12.328 m3

- unitx 0.600 mx 0.600 mx 0.05 m= - m3


4.000 unitx 0.800 mx 1.550 mx 0.05 m= 0.248 m3
2.000 unitx 2.240 m2x 0.050 m= 0.224 m3
10.000 unitx 1.550 mx 1.550 mx 0.05 m= 1.201 m3
2.000 unitx 2.300 mx 1.550 mx 0.05 m= 0.357 m3
4.000 unitx 2.300 mx 2.300 mx 0.05 m= 1.058 m3
5.000 unitx 2.300 mx 2.300 mx 0.05 m= 1.323 m3
5.000 unitx 3.050 mx 2.300 mx 0.05 m= 1.754 m3

32.000 6.164 m3

4.000 unitx 0.800 mx 1.550 mx 0.700 m= 3.472 m3

6.000 bhx 4.350 mx 1.042 = 27.196 kg


11.000 bhx 2.850 mx 1.042 = 32.667 kg
3.000 bhx 4.550 mx 1.042 = 14.223 kg

74.086 kgx 4.000 = 296.345 kg

g 0.800 mx 0.700 mx 2.000 ssx 4.000 = 4.480 m2


PERHITUNGAN VOLUME
1.550 mx 0.700 mx 2.000 ssx 4.000 = 8.680 m2

13.160 m2

2.000 unitx 2.240 m2x 0.700 m= 3.136 m3

1.000 bhx 4.350 mx 1.042 = 4.533 kg


1.000 bhx 4.350 mx 1.042 = 4.533 kg
1.000 bhx 4.350 mx 1.042 = 4.533 kg
6.000 bhx 4.350 mx 1.042 = 27.196 kg
8.000 bhx 4.350 mx 1.042 = 36.262 kg
1.000 bhx 4.050 mx 1.042 = 4.220 kg
1.000 bhx 3.550 mx 1.042 = 3.699 kg
1.000 bhx 3.060 mx 1.042 = 3.189 kg
3.000 bhx 5.650 mx 1.042 = 17.662 kg

105.826 kgx 2.000 = 211.651 kg

g 5.700 mx 0.700 mx 2.000 = 7.980 m2


PERHITUNGAN VOLUME

10.000 unitx 1.550 mx 1.550 mx 0.700 m= 16.818 m3

11.000 bhx 6.050 mx 1.042 = 69.345 kg


11.000 bhx 6.050 mx 1.042 = 69.345 kg
3.000 bhx 6.000 mx 1.042 = 18.756 kg

157.446 kgx 10.000 = 1,574.462 kg

g 1.550 mx 0.700 mx 2.000 ssx 10.000 = 21.700 m2


1.550 mx 0.700 mx 2.000 ssx 10.000 = 21.700 m2

43.400 m2

2.000 unitx 2.300 mx 1.550 mx 0.700 m= 4.991 m3

11.000 bhx 5.850 mx 1.042 = 67.053 kg


16.000 bhx 4.350 mx 1.042 = 72.523 kg
3.000 bhx 7.500 mx 1.042 = 23.445 kg

163.021 kgx 2.000 = 326.042 kg

g 2.300 mx 0.700 mx 2.000 ssx 2.000 = 6.440 m2


1.550 mx 0.700 mx 2.000 ssx 2.000 = 4.340 m2

10.780 m2

4.000 unitx 2.300 mx 2.300 mx 0.700 m= 14.812 m3

16.000 bhx 5.850 mx 1.042 = 97.531 kg


PERHITUNGAN VOLUME
16.000 bhx 5.850 mx 1.042 = 97.531 kg
3.000 bhx 9.000 mx 1.042 = 28.134 kg

223.196 kgx 4.000 = 892.786 kg

g 2.300 mx 0.700 mx 2.000 ssx 4.000 = 12.880 m2


2.300 mx 0.700 mx 2.000 ssx 4.000 = 12.880 m2

25.760 m2

5.000 unitx 2.300 mx 2.300 mx 0.700 m= 18.515 m3

16.000 bhx 5.850 mx 1.042 = 97.531 kg


16.000 bhx 5.850 mx 1.042 = 97.531 kg
3.000 bhx 9.000 mx 1.042 = 28.134 kg

223.196 kgx 5.000 = 1,115.982 kg

g 2.300 mx 0.700 mx 2.000 ssx 5.000 = 16.100 m2


2.300 mx 0.700 mx 2.000 ssx 5.000 = 16.100 m2

32.200 m2

5.000 unitx 3.050 mx 2.300 mx 0.700 m= 24.553 m3

16.000 bhx 7.350 mx 1.042 = 122.539 kg


21.000 bhx 5.850 mx 1.042 = 128.010 kg
3.000 bhx 10.500 mx 1.042 = 32.823 kg

283.372 kgx 5.000 = 1,416.860 kg


PERHITUNGAN VOLUME
g 3.050 mx 0.700 mx 2.000 ssx 5.000 = 21.350 m2
2.300 mx 0.700 mx 2.000 ssx 5.000 = 16.100 m2

37.450 m2

0.450 x 0.450 x 0.700 mx 30.000 unit= 4.253 m3

12.000 x 2.145 mx 2.230 x 30.000 = 1,722.006 kg

50 0.700 + 1.000 = 5.667 x 1.600 x 0.617 x 30.000 = 167.824 kg


0.150

g 0.450 mx 0.700 mx 4.000 ssx 30.000 = 37.800 m2

44.450 mx 4.000 bh= 177.800 m


19.450 mx 7.000 bh= 136.150 m

313.950 m- 20.000 = 293.950 mx 0.350 mx 0.500 = 51.441


:
5 0.450 mx 30.000 = 13.500 m
0.250 mx 26.000 = 6.500 m
20.000
PERHITUNGAN VOLUME
2 11.000 x 313.950 x 2.980 = 10,291.281 kg

50 293.950 + 1.000 = 1,960.667 x 1.700 x 0.617 = 2,056.543 kg


0.150

293.950 mx 0.350 m= 102.883 m2


293.950 mx 0.500 m= 146.975 m2
293.950 mx 0.500 m= 146.975 m2

396.833 m2

44.350 mx 2.000 bh= 88.700 m


19.350 mx 5.000 bh= 96.750 m

185.450 m- 2.500 = 182.950 mx 0.250 mx 0.400 = 18.295

8.000 x 185.450 x 1.579 = 2,342.604 kg

0 182.950 + 1.000 = 1,220.667 x 1.300 x 0.395 = 626.812 kg


0.150

182.950 mx 0.250 m= 45.738 m2


182.950 mx 0.400 m= 73.180 m2
182.950 mx 0.400 m= 73.180 m2

192.098 m2
PERHITUNGAN VOLUME

4.075 mx 2.000 bh= 8.150 m


3.300 mx 1.000 bh= 3.300 m
2.575 mx 6.000 bh= 15.450 m
0.835 mx 4.000 bh= 3.340 m
3.650 mx 1.000 bh= 3.650 m
3.950 mx 1.000 bh= 3.950 m

37.840 m- 3.600 = 34.240 mx 0.200 mx 0.300 = 2.054


:
5 0.450 mx 8.000 = 3.600 m

3.600

5.000 x 37.840 x 1.579 = 298.747 kg

0 34.240 + 1.000 = 229.267 x 1.000 x 0.395 = 90.560 kg


0.150

34.240 mx 0.200 m= 6.848 m2


34.240 mx 0.300 m= 10.272 m2
34.240 mx 0.300 m= 10.272 m2

27.392 m2

4.300 mx 2.000 bh= 8.600 m


1.750 mx 2.000 bh= 3.500 m

12.100 m- - = 12.100 mx 0.150 mx 0.300 = 0.545

4.000 x 12.100 x 1.579 = 76.424 kg


PERHITUNGAN VOLUME
0 12.100 + 1.000 = 81.667 x 0.900 x 0.395 = 29.033 kg
0.150

12.100 mx 0.150 m= 1.815 m2


12.100 mx 0.300 m= 3.630 m2
12.100 mx 0.300 m= 3.630 m2

9.075 m2

66.250 mx 1.000 = 66.250 m


57.250 mx 1.000 = 57.250 m

123.500 m- 8.100 = 115.400 mx 0.100 mx 0.300 m= 3.462


tinggi balok+tutup kolong
115.400 mx 0.400 mx 1.000 lpsx 4.170 = 192.487 kg

115.400 mx 0.300 mx 2.000 ss= 69.240 m2

60) 123.500 mx 0.400 m= 49.400 m2

4.075 mx 2.000 = 8.150 m

8.150 m- 0.900 = 7.250 mx 0.100 mx 0.500 m= 0.363


tinggi balok+tutup kolong
7.250 mx 0.600 mx 1.000 lpsx 4.170 = 18.140 kg

7.250 mx 0.500 mx 2.000 ss= 7.250 m2


PERHITUNGAN VOLUME
8.150 mx 0.600 m= 4.890 m2

0.450 x 0.450 x 3.400 mx 30.000 unit= 20.655 m3

12.000 x 4.500 mx 2.230 kg/mx 30.000 = 3,612.600 kg

50 3.400 + 1.000 = 23.667 x 1.600 x 0.617 x 30.000 = 700.912 kg


0.150

g 0.450 mx 3.400 mx 4.000 ssx 30.000 = 183.600 m2

0.450 mx 3.400 mx 4.000 ss= 6.120 m2- 3.060 = 3.060 m2x 20.000 bh= 61.200
0.450 mx 3.400 mx 4.000 ss= 6.120 m2- 4.590 = 1.530 m2x 10.000 bh= 15.300

76.500

0.300 x 0.300 x 3.600 mx 2.000 unit= 0.648 m3

8.000 x 4.500 mx 1.579 x 2.000 = 113.688 kg

0 3.600 + 1.000 = 25.000 x 1.000 x 0.395 x 2.000 = 19.750 kg


0.150

g 0.300 mx 3.600 mx 4.000 ssx 2.000 = 8.640 m2

0.300 mx 3.600 mx 4.000 ss= 4.320 m2- - = 4.320 m2x 2.000 bh= 8.640
0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 1.080 = 3.240 m2x bh=
0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 2.160 = 2.160 m2x bh=
0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 3.240 = 1.080 m2x bh=
PERHITUNGAN VOLUME
8.640

0.200 x 0.200 x 3.600 mx 1.000 unit= 0.144 m3

8.000 x 4.500 mx 1.579 x 1.000 = 56.844 kg

0 3.600 + 1.000 = 25.000 x 0.600 x 0.395 x 1.000 = 5.925 kg


0.150

g 0.200 mx 3.600 mx 4.000 ssx 1.000 = 2.880 m2

0.200 mx 3.600 mx 4.000 ss= 2.880 m2- 2.160 = 0.720 m2x 1.000 bh= 0.720

0.090 mx 0.090 mx 3.600 mx 217.000 bh= 6.328 m3

4.000 x 3.600 x 0.395 x 217.000 = 1,234.296 kg


0 3.600 + 1.000 = 25.000 x 0.160 x 0.395 x 217.000 = 342.860 kg
0.150
1,577.156 kg

0.090 mx 3.600 mx 1.000 ssx 217.000 = 70.308 m2

7.600 x 3.000 = 22.800 m


3.880 x 4.000 = 15.520 m
4.000 x 3.000 = 12.000 m
7.600 x 1.000 = 7.600 m

57.920 mx 0.090 x 0.090 = 0.469 m3


PERHITUNGAN VOLUME
PERHITUNGAN VOLUME
4.000 x 57.920 x 0.395 = 91.514 kg
0 57.920 + 1.000 = 387.133 x 0.160 x 0.395 = 24.467 kg
0.150
115.980 kg

0.090 mx 57.920 mx 1.000 = 5.213 m2

28.450 mx 1.000 bh= 28.450 m


44.450 mx 1.000 bh= 44.450 m
4.075 mx 2.000 bh= 8.150 m
13.275 mx 1.000 bh= 13.275 m
5.450 mx 1.000 bh= 5.450 m
2.275 mx 3.000 bh= 6.825 m
8.450 mx 1.000 bh= 8.450 m

115.050 m- 9.000 = 106.050 mx 0.150 mx 0.400 = 6.363


:
5 0.450 mx 20.000 = 9.000 m

9.000

4.000 x 115.050 x 1.579 = 726.656 kg


PERHITUNGAN VOLUME
0 106.050 + 1.000 = 708.000 x 0.900 x 0.395 = 251.694 kg
0.150

106.050 mx 0.150 m= 15.908 m2


106.050 mx 0.300 m= 31.815 m2
106.050 mx 0.300 m= 31.815 m2

79.538 m2

28.450 mx 1.000 bh= 28.450 m


44.450 mx 1.000 bh= 44.450 m
4.075 mx 2.000 bh= 8.150 m
13.275 mx 1.000 bh= 13.275 m
5.450 mx 1.000 bh= 5.450 m
2.275 mx 3.000 bh= 6.825 m
8.450 mx 1.000 bh= 8.450 m

106.425 m 115.050 m2x 0.100 m= 12.569 m3

106.425 mx 0.800 m= 85.140 m2

85.140 m2x 2.000 lpsx 4.170 = 710.068 kg

115.050 m2x 1.000 = 115.050 m2


106.425 mx 0.300 m= 31.928 m2

146.978 m2

115.050 m2x 2.000 ss= 230.100 m2


106.425 mx 0.300 m= 31.928 m2

262.028 m2
PERHITUNGAN VOLUME

44.450 mx 4.000 bh= 177.800 m


19.450 mx 7.000 bh= 136.150 m

313.950 m- 22.050 = 291.900 mx 0.350 mx 0.500 = 51.083


:
5 0.450 mx 30.000 = 13.500 m
0.200 mx 4.000 = 0.800 m
0.250 mx 31.000 = 7.750 m
22.050

2 11.000 x 313.950 x 2.980 = 10,291.281 kg

50 291.900 + 1.000 = 1,947.000 x 1.700 x 0.617 = 2,042.208 kg


0.150

291.900 mx 0.350 m= 102.165 m2


291.900 mx 0.500 m= 145.950 m2
291.900 mx 0.500 m= 145.950 m2

394.065 m2

7.300 mx 1.000 = 7.300 m


8.200 mx 1.000 = 8.200 m
57.450 mx 1.000 = 57.450 m
7.550 mx 1.000 = 7.550 m
27.600 mx 1.000 = 27.600 m
10.500 mx 1.000 = 10.500 m

118.600 m- 6.750 = 111.850 mx 0.600 m= 67.110 m2


PERHITUNGAN VOLUME

40.350 mx 2.000 bh= 80.700 m


19.350 mx 5.000 bh= 96.750 m

177.450 m- 2.500 = 174.950 mx 0.250 mx 0.400 = 17.495

8.000 x 177.450 x 1.579 = 2,241.548 kg

0 174.950 + 1.000 = 1,167.333 x 1.300 x 0.395 = 599.426 kg


0.150

174.950 mx 0.250 m= 43.738 m2


174.950 mx 0.400 m= 69.980 m2
174.950 mx 0.400 m= 69.980 m2

183.698 m2

7.975 mx 1.000 bh= 7.975 m


4.075 mx 1.000 bh= 4.075 m
4.400 mx 1.000 bh= 4.400 m
5.275 mx 1.000 bh= 5.275 m
3.300 mx 1.000 bh= 3.300 m
2.275 mx 6.000 bh= 13.650 m
0.885 mx 8.000 bh= 7.080 m

45.755 m- 3.600 = 42.155 mx 0.200 mx 0.300 = 2.529


:
5 0.450 mx 8.000 = 3.600 m
0.300 mx 2.000 = m
3.600
PERHITUNGAN VOLUME
5.000 x 45.755 x 1.579 = 361.236 kg

0 42.155 + 1.000 = 282.033 x 1.000 x 0.395 = 111.403 kg


0.150

42.155 mx 0.200 m= 8.431 m2


42.155 mx 0.300 m= 12.647 m2
42.155 mx 0.300 m= 12.647 m2

33.724 m2

4.400 m
4.350 m

8.750 mx 5.100 m= 3.650 mx 0.400 m= 1.460 m2

4.300 mx 2.000 bh= 8.600 m


1.700 mx 2.000 bh= 3.400 m

12.000 m- - = 12.000 mx 0.150 mx 0.300 = 0.540

4.000 x 12.000 x 1.579 = 75.792 kg

0 12.000 + 1.000 = 81.000 x 0.900 x 0.395 = 28.796 kg


0.150

12.000 mx 0.150 m= 1.800 m2


12.000 mx 0.300 m= 3.600 m2
12.000 mx 0.300 m= 3.600 m2

9.000 m2
PERHITUNGAN VOLUME

0.450 x 0.450 x 3.450 mx 30.000 unit= 20.959 m3

12.000 x 4.000 mx 2.230 kg/mx 30.000 = 3,211.200 kg

50 3.450 + 1.000 = 24.000 x 1.600 x 0.617 x 30.000 = 710.784 kg


0.150

g 0.450 mx 3.450 mx 4.000 ssx 30.000 = 186.300 m2

0.450 mx 3.450 mx 4.000 ss= 6.210 m2- 3.105 = 3.105 m2x 9.000 bh= 27.945
0.450 mx 3.450 mx 4.000 ss= 6.210 m2- 4.658 = 1.553 m2x 20.000 bh= 31.050
0.450 mx 3.450 mx 4.000 ss= 6.210 m2- - = 6.210 m2x 1.000 bh= 6.210

65.205

0.300 x 0.300 x 3.600 mx 2.000 unit= 0.648 m3

8.000 x 4.500 mx 1.579 x 2.000 = 113.688 kg

0 3.600 + 1.000 = 25.000 x 1.000 x 0.395 x 2.000 = 19.750 kg


0.150

g 0.300 mx 3.600 mx 4.000 ssx 2.000 = 8.640 m2

0.300 mx 3.600 mx 4.000 ss= 4.320 m2- - = 4.320 m2x bh=


0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 1.080 = 3.240 m2x bh=
0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 2.160 = 2.160 m2x 2.000 bh= 4.320
0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 3.240 = 1.080 m2x bh=

4.320
PERHITUNGAN VOLUME

0.090 mx 0.090 mx 3.600 mx 170.000 bh= 4.957 m3

4.000 x 3.600 x 0.395 x 170.000 = 966.960 kg


0 3.600 + 1.000 = 25.000 x 0.160 x 0.395 x 170.000 = 268.600 kg
0.150
1,235.560 kg

0.090 mx 3.600 mx 1.000 ssx 170.000 = 55.080 m2

7.600 x 1.000 = 7.600 m


4.700 x 5.000 = 23.500 m
7.880 x 6.000 = 47.280 m
3.800 x 2.000 = 7.600 m

85.980 mx 0.090 x 0.090 = 0.696 m3

4.000 x 85.980 x 0.395 = 135.848 kg


0 85.980 + 1.000 = 574.200 x 0.160 x 0.395 = 36.289 kg
0.150
172.138 kg

0.090 mx 85.980 mx 1.000 = 7.738 m2

40.450 mx 2.000 bh= 80.900 m

80.900 m- 5.400 = 75.500 mx 0.150 mx 0.400 = 4.530


:
PERHITUNGAN VOLUME
5 0.450 mx 12.000 = 5.400 m

5.400

4.000 x 80.900 x 1.579 = 510.964 kg

0 75.500 + 1.000 = 504.333 x 0.900 x 0.395 = 179.291 kg


0.150

75.500 mx 0.150 m= 11.325 m2


75.500 mx 0.300 m= 22.650 m2
75.500 mx 0.300 m= 22.650 m2

56.625 m2
PERHITUNGAN VOLUME

7.550 mx 2.000 = 15.100 m

15.100 mx 0.400 m= 6.040 m2

0.090 mx 0.090 mx 0.800 mx 48.000 bh= 0.311 m3

4.000 x 0.800 x 0.395 x 48.000 = 60.672 kg


0 0.800 + 1.000 = 6.333 x 0.160 x 0.395 x 48.000 = 19.213 kg
0.150
79.885 kg

0.090 mx 0.800 mx 2.000 ssx 48.000 = 6.912 m2

16.200 mx 4.000 bh= 64.800 m

64.800 mx 0.585 mx 0.100 m= 4.439 m3

64.800 mx 0.735 mx 2.000 x 4.170 = 397.218 kg

64.800 mx 0.585 m= 37.908 m2


64.800 mx 0.300 m= 19.440 m2

57.348 m2

64.800 mx 0.585 mx 2.000 ss= 75.816 m2


21.220 mx 0.300 mx 4.000 bh= 25.464 m2

101.280 m2
ANALISA HARGA SATUAN PEKERJAAN
UNIT KERJA : DINAS PEKERJAAN UMUM KALIMANTAN BARAT
PEKERJAAN : PEMBANGUNAN MENARA MERCUSUAR
LOKASI : D.I WAY PALAKIA - KEC. SUKAU, KAB. LAMPUNG BARAT
PEMERINTAH : KALIMANTAN BARAT TAHUN ANGGARAN 2019

2.2.1.4.a Pengukuran dan Pemasangan 1m Bouplank

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A TENAGA
1 Pekerja L.01 OH 0.100 106,000.00
2 Tukang Kayu L.02 OH 0.100 125,000.00
3 Kepala Tukang L.03 OH 0.010 135,000.00
4 Mandor L.04 OH 0.005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Balok Uk. 5/7 cm M3 0.012 1,800,000.00
Paku Kg 0.020 15,500.00
Papan Kayu Kelas III M3 0.007 1,800,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1m


Harga Satuan
No Uraian Kode Satuan Koefisien
A TENAGA (Rp)
1 Pekerja L.01 OH 0.750 106,000.00
2 Mandor L.04 OH 0.025 115,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.1.1.7.a Membuat 1 m³ beton mutu f'c =19,3 Mpa ( K 225), slump (12 ± 2) cm ,w/c = 0,58 (Menggunakan Molen)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A TENAGA
1 Pekerja L.01 OH 1.323 106,000.00
2 Tukang L.02 OH 0.189 125,000.00
3 Kepala Tukan L.03 OH 0.019 135,000.00
4 Mandor L.04 OH 0.066 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portlan Kg 371.000 1,360.00
2 Pasir Beton Kg 698.000 57.14
3 Batu Pecah Kg 1,047.000 370.37
1-2 cm
4 Air Liter - -
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Molen Sewa-hari 0.250 100,000.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

4.1.1.17.a Pembesian 10 Kg dengan besi polos atau besi ulir U 24

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A TENAGA
1 Pekerja L.01 OH 0.070 106,000.00
2 Tukang L.02 OH 0.070 125,000.00
3 Kepala Tukan L.03 OH 0.007 135,000.00
4 Mandor L.04 OH 0.004 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Beton
1 (polos/ulir) Kg 10.500 12,500.00
2U 24 Beton
Kawat Kg 0.150 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (D+E) per 1 kg

20 November 2019
CV. DUTA KHATULISTIWA

RIEFKI GUNAWAN SETIADI,A.Md


DIREKTUR
N

Jumlah Harga (Rp)

10,600.00
12,500.00
1,350.00
575.00
25,025.00

21,600.00
310.00
12,600.00
34,510.00

59,535.00
5,953.50
65,488.50

Jumlah Harga
(Rp)
79,500.00
2,875.00
82,375.00

82,375.00
8,237.50
90,612.50
= 0,58 (Menggunakan Molen)

Jumlah Harga (Rp)

140,238.00
23,625.00
2,565.00
7,590.00
174,018.00

504,560.00
39,885.71
387,777.78
-
932,223.49

25,000.00
25,000.00

1,131,241.49
113,124.15
1,244,365.64

Jumlah Harga (Rp)

7,420.00
8,750.00
945.00
460.00
17,575.00

131,250.00
1,950.00
133,200.00

150,775.00
15,077.50
165,852.50
16,585.25

20 November 2019
CV. DUTA KHATULISTIWA

FKI GUNAWAN SETIADI,A.Md


DIREKTUR
DAFTAR HARGA DASAR SATUAN UPAH AN BAHAN
TAHUN ANGGARAN 2019

NO. TENAGA KERJA KODE

Pekerja tak terlatih


Tukang
Kepala tukang
Mandor

NO. NAMA BARANG Satuan

1 2 3

A. BAHAN PENGISI
Pasir Beton M³
Batu Pecah 2-3 cm M³
Batu Pecah 1-2 cm M³
Semen (1 Zak @ 50 kg) Kg
Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25 K 450 -6 m Btg
Beton Ready Mix K 300 M³
Beton Ready Mix K 225 M³
Beton Ready Mix K 250 M³
Sewa Molen sewa-hr
Pompa Ready Mix /perhari
B. BAHAN KAYU
Balok Kayu Klas II Tidak Ketam M³
Papan Kayu Klas II Ketam M³
Papan Kayu Klas II Tidak Ketam M³
Papan Kayu Camp. ( Klas III ) M³
Kayu Bulat Ø 8 - 12 Cm / 4 M' Btg
Kayu Bulat Ø 6 - 8 Cm / 4 M' Btg
Woodplank M

C. BAHAN PENUTUP ATAP


Seng Gelombang BJLS 0.20 Kpg
Alumunium Plat 0.30 mm Kpg
Rangka Baja Ringan Zincalume (truss/polos) M²
Zincalume Gelombang Persegi 0.35 (color) M²
Nok/Prabung Steel Sheet 0.35 lebar 333 mm (coklat, biru, merah, hija M
D. BAHAN FINISHING CAT
Cat Kilat Kg
Cat Tembok Kg
NO. NAMA BARANG Satuan

1 2 3
Cat Dasar Kg
Pelamur Air Kg
Cat Waterproofing Kg
F. BAHAN PENUTUP LANTAI
Bataco 7x15x30 Keping
Keramik Anti Gores 60x60 Polished M2 (Ktk)
Keramik Anti Gores 60x60 Unpolished M2 (Ktk)
Keramik 30x30 Polished M2 (Ktk)
Keramik 30x30 Unpolished M2 (Ktk)
Keramik 20x40 M2 (Ktk)
Oker / Semen Warna Kg
Lantai Vynil M2
Plint keramik 10 x 40 cm kotak
NO. NAMA BARANG Satuan

1 2 3
D BAHAN PENGGANTUNG
Paku Besi uk. 2" - 4 " Kg
Kait Angin Jendela Bh
Gagang Pintu Bh
Kunci Tanam Biasa Bh
Kunci Tanam Besar Bh
Engsel Jendela Psg
Engsel Pintu Psg
Grendel 3" Bh
Handle Jendela Bh
E BAHAN LAIN - LAIN
Kloset duduk putih Bh
Wastafel Bh
Wastafel Cuci Bayi Bh
Wall Shower/ Fix Shower Bh
Hand Shower Unit
Kran Air Uk. 3/4" Bh
Jet Washer Unit
Floordrain Bh
Kitchenzink stainless steel 1 lubang Unit
Slop Sink/ Spoel Hoek Unit
Grab Bar Stainless Unit
Grab Bar Difable Unit

Multiplek 5 mm Lbr
Papan Gypsum ( 122 x 244 ) cm Lbr
Panel GRC 120 x 240 x 40 Lbr
Kaca 5 mm ( Polos ) M²
Kaca Polos, t = 8 mm M²
Kaca Cermin t = 5 mm M²
Pintu Tempered Polos 12 mm - Uk. 87 x 213,5 cm Unit
Pintu Tempered Polos 12 mm M2
Besi Beton ulir Kg
Besi Beton polos Kg
Kawat Bendrat Kg
Wiremesh Kg
Rangka Plafond Metal Furing + Pemasangan M2
Paku Sekrup Gibsum Kg
Jalusi Aluminium M2
Partisi Cubical Unit
Kusen Aluminium 3" Silver M'
Profil Pintu Aluminium M'
Rangka Metal hollow 40.40.2 mm M'
Pipa stainless steel M'
NO. NAMA BARANG Satuan

1 2 3
Sealtape Bh
ACP Flat Tebal 0.3 mm + Pemasangan M2
Skrup Fixer Bh
Sealant Kg
Lem Kayu Kg
Plywood 4 mm Lbr
HPL 1,22 m x 2,44 m x 0,7 mm Lbr
Door Stoper Bh
Door Closer Bh
Roda Gantung Bh
A DASAR SATUAN UPAH AN BAHAN
TAHUN ANGGARAN 2019

UPAH TENAGA
KERJA
( Rp/Hari )
106,000.00
125,000.00
135,000.00
115,000.00

Harga
Dasar
( Rp. )
4

Poli
80,000.00
470,000.00
500,000.00
1,360.00
1,600,000.00
1,350,000.00
1,200,000.00
1,250,000.00
100,000.00
4,000,000.00

1,900,000.00
3,250,000.00
2,850,000.00
1,800,000.00
12,000.00
8,000.00
50,000.00

46,000.00
90,000.00
150,000.00
88,000.00
29,480.00

56,000.00
50,000.00
Harga
Dasar
( Rp. )
4
12,750.00
12,000.00
45,000.00

1,300.00
200,000.00
198,000.00
98,000.00
96,000.00
110,000.00
14,000.00
550,000.00
97,500.00
Harga
Dasar
( Rp. )
4

15,500.00
7,500.00
80,000.00
130,000.00
150,000.00
8,000.00
10,000.00
9,000.00
15,400.00

2,000,000.00
550,000.00
550,000.00
170,000.00
500,000.00
30,000.00
245,000.00
15,000.00
650,000.00
4,000,000.00
426,000.00
2,900,000.00

95,000.00
71,000.00
70,000.00
160,000.00
398,000.00
418,000.00
4,840,000.00
2,650,000.00
14,000.00
12,500.00
13,000.00
11,500.00
120,000.00
53,000.00
942,000.00
3,000,000.00
78,000.00
70,000.00
26,000.00
121,275.00
Harga
Dasar
( Rp. )
4
3,500.00
850,000.00
600.00
35,000.00
18,500.00
55,000.00
450,000.00
250,000.00
150,000.00
130,000.00
2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN

2.2.1.2.a Pembuatan 1 m² pagar sementara dari seng gelombang tinggi 2 meter tanpa beton

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A TENAGA
1 Pekerja L.01 OH 0.200 106,000.00
2 Tukang Kayu L.02 OH 0.400 125,000.00
3 Kepala Tukang L.03 OH 0.020 135,000.00
4 Mandor L.04 OH 0.020 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Dolken kayu ф 8-10/400cm Batang 1.250 12,000.00
2 Seng Gelombang Lbr 1.200 46,000.00
3 Kayu 5/7 m³ 0.072 1,800,000.00
4 Paku Biasa 2''-5'' Kg 0.060 15,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

2.2.1.4.a Pengukuran dan Pemasangan 1m Bouplank

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A TENAGA
1 Pekerja L.01 OH 0.100 106,000.00
2 Tukang Kayu L.02 OH 0.100 125,000.00
3 Kepala Tukang L.03 OH 0.010 135,000.00
4 Mandor L.04 OH 0.005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Balok Uk. 5/7 cm M3 0.012 1,800,000.00
Paku Kg 0.020 15,500.00
Papan Kayu Kelas III M3 0.007 1,800,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
2.2.1.9 Pembersihan 1m² lapangan dan perataan

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A TENAGA
1 Pekerja L.01 OH 0.100 106,000.00
2 Mandor L.02 OH 0.050 115,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
E Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)

21,200.00
50,000.00
2,700.00
2,300.00
76,200.00

15,000.00
55,200.00
129,600.00
930.00
200,730.00

276,930.00
27,693.00
304,623.00

Jumlah Harga (Rp)

10,600.00
12,500.00
1,350.00
575.00
25,025.00

21,600.00
310.00
12,600.00
34,510.00
59,535.00
5,953.50
65,488.50
Jumlah Harga (Rp)

10,600.00
5,750.00
16,350.00

16,350.00
1,635.00
17,985.00
2.3.1. HARGA SATUAN PEKERJAAN TANAH
2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1m

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.750 106,000.00
2 Mandor L.04 OH 0.025 115,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

2.3.1.11 Pengurugan 1 m³ dengan pasir urug

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 106,000.00
2 Mandor L.04 OH 0.010 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug 1.200 80,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)

79,500.00
2,875.00
82,375.00

82,375.00
8,237.50
90,612.50

Jumlah Harga (Rp)

31,800.00
1,150.00
32,950.00

96,000.00
96,000.00

128,950.00
12,895.00
141,845.00
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

KEGIATAN :
PEKERJAAN : PEMBANGUNAN GEDUNG RUANG OPERASI (OK)
SUB PEKERJAAN : PEMBANGUNAN RUANG OPERASI (OK)
LOKASI :
TAHUN ANGGARAN :

NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4
A. PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank 128.000 11.111 1,478.722 M'
2 Pembongkaran 1.000 1.000 Lsm
3 Pagar Sementara 171.400 11.111 1,980.101 M'
PEKERJAAN PENDAHULUAN
B. PEKERJAAN PONDASI
1 Pengadaan Tiang Pancang (Mini Pile / Ready 597.000 1,111.111 6,897.000 Btg
Mix) uk. Π 25 x 25, 8 D 13, ø 6 K 350 -6 m
2 Pemancangan Mini Pile 25 x 25 K350 3,582.000 11,111.111 41,381.000 M'
3 Pembobokan Mini Pile 199.000 1,111.111 2,299.000 Titik
4 Galian Tanah Pondasi 104.788 11.111 1,210.565 M³
5 Urugan Pasir t = 10 cm 12.328 11.111 142.419 M³
6 Lantai Kerja t = 5 cm 6.164 11.111 71.210 M³
7 Poer Type P1 11.111 -
- Beton Ready Mix K-300 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Bekisting Pondasi - 11.111 - M²
8 Poer Type P2 11.111 -
- Beton Ready Mix K-300 3.472 11.111 40.110 M³
- Tulangan U32 296.345 11.111 3,423.528 Kg
- Bekisting Pondasi 13.160 11.111 152.031 M²
9 Poer Type P3 11.111 -
- Beton Ready Mix K-300 3.136 11.111 36.229 M³
- Tulangan U32 211.651 11.111 2,445.102 Kg
- Bekisting Pondasi 7.980 11.111 92.189 M²
10 Poer Type P4 11.111 -
- Beton Ready Mix K-300 16.818 11.111 194.284 M³
- Tulangan U32 1,574.462 11.111 18,188.998 Kg
- Bekisting Pondasi 43.400 11.111 501.379 M²
11 Poer Type P6 11.111 -
- Beton Ready Mix K-300 4.991 11.111 57.659 M³
- Tulangan U32 326.042 11.111 3,766.603 Kg
- Bekisting Pondasi 10.780 11.111 124.536 M²
12 Poer Type P7 11.111 -
NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4
- Beton Ready Mix K-300 14.812 11.111 171.116 M³
- Tulangan U32 892.786 11.111 10,313.920 Kg
- Bekisting Pondasi 25.760 11.111 297.593 M²
13 Poer Type P9 11.111 -
- Beton Ready Mix K-300 18.515 11.111 213.895 M³
- Tulangan U32 1,115.982 11.111 12,892.400 Kg
- Bekisting Pondasi 32.200 11.111 371.991 M²
14 Poer Type P12 11.111 -
- Beton Ready Mix K-300 24.553 11.111 283.643 M³
- Tulangan U32 1,416.860 11.111 16,368.292 Kg
- Bekisting Pondasi 37.450 11.111 432.642 M²
15 Kolom Pondasi K1 Uk. 45x45 cm 11.111 -
- Beton Ready Mix K-250 4.253 11.111 49.127 M³
- Tulangan U32 1,722.006 11.111 19,893.502 Kg
- Tulangan U24 167.824 11.111 1,938.789 Kg
- Bekisting Pondasi 37.800 11.111 436.685 M²
16 Kolom Pondasi K2 Uk. 30x30 cm 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Pondasi - 11.111 - M²
PEKERJAAN PONDASI

C. PEKERJAAN STRUKTUR
Struktur Lantai 1
1 Sloof Uk. 35x60 cm
- Beton Ready Mix K-250 51.441 11.111 594.276 M³
- Tulangan U32 10,291.281 11.111 118,890.189 Kg
- Tulangan U24 2,056.543 11.111 23,758.249 Kg
- Bekisting Sloof 396.833 11.111 4,584.414 M²
2 Sloof Uk. 25x55 cm 11.111 -
- Beton Ready Mix K-250 8.010 11.111 92.536 M³
- Tulangan U32 1,018.139 11.111 11,762.069 Kg
- Tulangan U24 263.044 11.111 3,038.816 Kg
- Bekisting Sloof 81.880 11.111 945.920 M²
3 Sloof Uk. 25x50 cm 11.111 -
- Beton Ready Mix K-250 18.295 11.111 211.353 M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 2,342.604 11.111 27,062.975 Kg
- Bekisting Sloof - 11.111 - M²
4 Sloof Uk. 20x40 cm 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4
- Bekisting Sloof - 11.111 - M²
5 Sloof Uk. 15x40 cm 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Sloof 192.487 11.111 2,223.711 M²
6 Tutup Kolong Uk.10x30 cm (blk.35/60) 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh M6 - 11.111 - Kg
- Bekisting Sloof - 11.111 - M²
- Plesteran Tutup Kolong Uk.10x30 cm (blk.35/6 - 11.111 - M²
7 Tutup Kolong Uk. 10x35 (blk.25/55) 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh M6 0.363 11.111 4.188 Kg
- Bekisting Sloof 18.140 11.111 209.557 M²
- Plesteran Tutup Kolong Uk. 10x35 (blk.25/55) 7.250 11.111 83.756 M²
8 Tutup Kolong Uk.10/50 (blk.20/40) 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh M6 - 11.111 - Kg
- Bekisting Sloof 76.500 11.111 883.767 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) - 11.111 - M²
6 Kolom K1 Uk. 45x45 cm Lt.1 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 8.640 11.111 99.814 Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 45x45 Lt.1 - 11.111 - M²
7 Kolom K2 Uk. 30x30 cm Lt.1 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 30x30 Lt.1 - 11.111 - M²
8 Kolom K3 Uk. 20x20 cm Lt.1 11.111 -
- Beton Ready Mix K-250 1,577.156 11.111 18,220.120 M³
- Tulangan U32 70.308 11.111 812.234 Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 20x20 Lt.1 - 11.111 - M²
9 Kolom Praktis Uk.9x9 cm Lt.1 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting - 11.111 - M²
NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4
10 Balok Praktis Uk.9x9 cm Lt.1 (dinding) 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting 726.656 11.111 8,394.703 M²
Struktur Lantai 1

Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.110
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok List 15/40 elv.3.11 - 11.111 - M²
2 List Plat Dack elv. 3.110 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
- Plesteran List Plat Dack elv. 3.110 - 11.111 - M²
3 Balok Uk. 35x60 cm Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok 35x60 cm Lt.2 - 11.111 - M²
4 Balok Uk. 25x55 cm Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Uk. 25x55 cm Lt.2 - 11.111 - M²
5 Balok Uk. 25x50 cm Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
6 Balok Uk. 20x40 cm Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 20.959 11.111 242.126 Kg
- Tulangan U24 3,211.200 11.111 37,097.440 Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Uk. 20x40 cm Lt.2 - 11.111 - M²
7 Balok Uk. 15x40 cm Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
8 Kolom K1 Uk. 45x45 cm (elv.4.00-8.00) Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 0.696 11.111 8.046 Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 45x45 Lt.2 - 11.111 - M²
9 Kolom K2 Uk. 30x30 cm (elv.4.00-8.00) Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 4.530 11.111 52.333 Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 30x30 Lt.2 - 11.111 - M²
10 Kolom Praktis Uk.9x9 cm Lt.2 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 0.311 11.111 3.593 Kg
- Bekisting - 11.111 - M²
11 Balok Praktis Uk.9x9 cm Lt.2 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting - 11.111 - M²
elv.4.800 11.111 -
12 Balok Uk. 15x40 cm elv.4.8 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Uk. 15x40 cm elv.4.8 - 11.111 - M²
13 Kolom Praktis Uk.9x9 cm elv.4.8 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting - 11.111 - M²
13 List Plat Dack elv. 4.8 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
- Plesteran List Plat Dack elv. 4.8 - 11.111 - M²
elv.6.550 11.111 -
14 List Plat Dack elv. 6.55 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
- PlesteranList Plat Dack elv. 6.55 - 11.111 - M²
NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4
elv.6.800 11.111 -
15 Balok Uk. 25x55 elv.6.8 11.111 -
- Beton Ready Mix K-250 3.645 11.111 42.109 M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
16 Balok Uk. 20x45 elv.6.8 11.111 -
- Beton Ready Mix K-250 371.776 11.111 4,294.943 M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 29.432 11.111 340.014 Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Uk. 20x45 elv.6.8 - 11.111 - M²
17 Balok Uk. 20x40 elv.6.8 11.111 -
- Beton Ready Mix K-250 50.528 11.111 583.726 M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
18 Balok Uk.15x40 elv.6.8 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok 547.707 11.111 6,327.389 M²
- Plesteran Balok Uk.15x40 elv.6.8 - 11.111 - M²
19 Kolom K3 Uk. 20x20 cm elv.6.8 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 20x20 elv.6.8 - 11.111 - M²
20 Kolom Praktis Uk.9x9 cm elv.6.8 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 195.051 11.111 2,253.330 Kg
- Bekisting - 11.111 - M²
21 Plat Dack & List Plat Dack elv. 6.80 & 7.05 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
- Plesteran Plat Dack & List Plat Dack elv. 6.8 - 11.111 - M²
- Acian Plat Dack elv. 6.8 - 11.111 - M²
- Waterproofing Plat Dack elv. 6.8 - 11.111 - M²
NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4
elv.7.05 11.111 -
22 Balok List dack Uk.15x40 elv.7.05 11.111 -
- Beton Ready Mix K-250 471.805 11.111 5,450.537 M³
- Tulangan U32 116.051 11.111 1,340.681 Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
Elv.7.50 11.111 -
23 Ring Balok uk. 20x40 cm Elv.7.50 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok 2.708 11.111 31.284 M²
Elv.8.00 11.111 -
24 Ring Balok uk. 25x55 cm Elv.8.00 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
25 Ring Balok Praktis uk.9x9 cm Elv.8.00 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting - 11.111 - M²
Elv.9.80 11.111 -
26 Balok Dack uk. 20x40 cm Elv.9.80 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 9.986 11.111 115.359 Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Dack uk. 20x40 cm Elv.9.80 - 11.111 - M²
27 Plat Dack elv. 9.90 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
- Plesteran Plat Dack & List Plat Dack elv. 9.8 - 11.111 - M²
- Acian Plat Dack elv. 9.8 - 11.111 - M²
- Waterproofing Plat Dack elv. 9.8 - 11.111 - M²

Struktur Lantai 2
PEKERJAAN STRUKTUR
C. PEKERJAAN PLAT LANTAI
1 Plat Lantai 1
- Beton Ready Mix K-250 t =12 cm - 11.111 - M³
- Beton Ready Mix K-250 t = 10 cm 41.039 11.111 474.100 M³
- Wiremesh 2xM6 20.503 11.111 236.859 Kg
NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4
- Bekisting Lantai - 11.111 - M²
2 Plat Lantai 2 11.111 -
- Beton Ready Mix K-250 t =12 cm - 11.111 - M³
- Beton Ready Mix K-250 t = 10 cm 15.000 11.111 173.288 M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
PEKERJAAN PLAT LANTAI
D. PEKERJAAN TANGGA
Tangga Type T1 (2 Unit)
1 Balok Bordes uk. 15x40 cm
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok 103.900 11.111 1,200.308 M²
- Plesteran Balok Bordes 15/40 103.900 11.111 1,200.308 M²
2 Plat Bordes 11.111 -
- Beton Ready Mix K-250 t = 14 cm - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Bawah Bordes 15/40 - 11.111 - M²
NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4
3 Plat Tangga 11.111 -
- Beton Ready Mix K-250 t = 14 cm - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting Plat - 11.111 - M²
- Plesteran Bawah Plat tangga 15/40 - 11.111 - M²
4 Anak Tangga 11.111 -
- Beton Ready Mix K-250 19.671 11.111 227.250 M³
- Wiremesh M6 - 11.111 - Kg
- Bekisting - 11.111 - M²
Tangga Type T2 (1 Unit) 11.111 -
1 Balok Bordes uk. 15x40 cm 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Bordes 15/40 - 11.111 - M²
2 Plat Bordes 11.111 -
- Beton Ready Mix K-250 t = 14 cm - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Bawah Bordes 15/40 - 11.111 - M²
3 Plat Tangga 11.111 -
- Beton Ready Mix K-250 t = 14 cm - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting Plat - 11.111 - M²
- Plesteran Bawah Plat tangga 15/40 - 11.111 - M²
4 Anak Tangga 11.111 -
- Beton Ready Mix K-250 9.836 11.111 113.625 M³
- Wiremesh M6 - 11.111 - Kg
- Bekisting - 11.111 - M²
PEKERJAAN TANGGA
E. PEKERJAAN ATAP
1 Rangka Atap Baja Ringan Zincallume - 11.111 - M2
2 Atap Zincallume Color t =0,35 mm - 11.111 - M2
3 Prabung Atap Zincallume - 11.111 - M
4 List Plank Woodplak 2 lps 29.604 11.111 342.005 M
PEKERJAAN ATAP
E. PEKERJAAN PENGECATAN
Lantai 1
1 Cat Insterior Strukur - 11.111 - M2
2 Cat Exterior Strukur - 11.111 - M2
Lantai 2 -
1 Cat Insterior Strukur - 11.111 - M2
2 Cat Exterior Strukur - 11.111 - M2
NO URAIAN PEKERJAAN VOLUME SAT

1 2 3 4
PEKERJAAN PENGECATAN
JUMLAH TOTAL PEKERJAAN STRUKTUR
JUMLAH TOTAL PPN 10 %
JUMLAH TOTAL PEKERJAAN STRUKTUR + PPN 10 %
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

:
: PEMBANGUNAN GEDUNG RUANG OPERASI (OK)
: PEMBANGUNAN RUANG OPERASI (OK)
:
N :

HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)

2 3 4 5 6
PENDAHULUAN
wplank 128.000 11.111 1,478.722 M' 2.2.1.4.a 65,488.50
1.000 1.000 Lsm 15,000,000.00
171.400 11.111 1,980.101 M' 2.2.1.2.a 304,623.00
PEKERJAAN PENDAHULUAN
PONDASI
g Pancang (Mini Pile / Ready 597.000 1,111.111 6,897.000 Btg 1,760,000.00
25, 8 D 13, ø 6 K 350 -6 m
ini Pile 25 x 25 K350 3,582.000 11,111.111 41,381.000 M' 120,000.00
ni Pile 199.000 1,111.111 2,299.000 Titik 40,000.00
ndasi 104.788 11.111 1,210.565 M³ 2.3.1.1 90,612.50
10 cm 12.328 11.111 142.419 M³ 2.3.1.11 141,845.00
5 cm 6.164 11.111 71.210 M³ 4.1.1.4 996,598.84
11.111 -
Mix K-300 - 11.111 - M³ B. 13.i.1 2,210,037.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
ndasi - 11.111 - M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 3.472 11.111 40.110 M³ B.13.i.2 2,210,037.50
2 296.345 11.111 3,423.528 Kg 4.1.1.17.b 18,317.75
ndasi 13.160 11.111 152.031 M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 3.136 11.111 36.229 M³ B.13.i.2 2,210,037.50
2 211.651 11.111 2,445.102 Kg 4.1.1.17.b 18,317.75
ndasi 7.980 11.111 92.189 M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 16.818 11.111 194.284 M³ B.13.i.2 2,210,037.50
2 1,574.462 11.111 18,188.998 Kg 4.1.1.17.b 18,317.75
ndasi 43.400 11.111 501.379 M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 4.991 11.111 57.659 M³ B.13.i.2 2,210,037.50
2 326.042 11.111 3,766.603 Kg 4.1.1.17.b 18,317.75
ndasi 10.780 11.111 124.536 M² 4.1.1.20.a 135,487.00
11.111 -
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)

2 3 4 5 6
Mix K-300 14.812 11.111 171.116 M³ B.13.i.2 2,210,037.50
2 892.786 11.111 10,313.920 Kg 4.1.1.17.b 18,317.75
ndasi 25.760 11.111 297.593 M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 18.515 11.111 213.895 M³ B.13.i.2 2,210,037.50
2 1,115.982 11.111 12,892.400 Kg 4.1.1.17.b 18,317.75
ndasi 32.200 11.111 371.991 M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 24.553 11.111 283.643 M³ B.13.i.2 2,210,037.50
2 1,416.860 11.111 16,368.292 Kg 4.1.1.17.b 18,317.75
ndasi 37.450 11.111 432.642 M² 4.1.1.20.a 135,487.00
K1 Uk. 45x45 cm 11.111 -
Mix K-250 4.253 11.111 49.127 M³ B. 13.g.1 2,097,837.50
2 1,722.006 11.111 19,893.502 Kg 4.1.1.17.b 18,317.75
4 167.824 11.111 1,938.789 Kg 4.1.1.17.a 16,585.25
ndasi 37.800 11.111 436.685 M² 4.1.1.20.a 135,487.00
K2 Uk. 30x30 cm 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
ndasi - 11.111 - M² 4.1.1.20.a 135,487.00
PEKERJAAN PONDASI

STRUKTUR
i1
cm
Mix K-250 51.441 11.111 594.276 M³ B. 13.g.1 2,097,837.50
2 10,291.281 11.111 118,890.189 Kg 4.1.1.17.b 18,317.75
4 2,056.543 11.111 23,758.249 Kg 4.1.1.17.a 16,585.25
oof 396.833 11.111 4,584.414 M² 4.1.1.21.a 135,487.00
cm 11.111 -
Mix K-250 8.010 11.111 92.536 M³ B. 13.g.1 2,097,837.50
2 1,018.139 11.111 11,762.069 Kg 4.1.1.17.b 18,317.75
4 263.044 11.111 3,038.816 Kg 4.1.1.17.a 16,585.25
oof 81.880 11.111 945.920 M² 4.1.1.21.a 135,487.00
cm 11.111 -
Mix K-250 18.295 11.111 211.353 M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 2,342.604 11.111 27,062.975 Kg 4.1.1.17.a 16,585.25
oof - 11.111 - M² 4.1.1.21.a 135,487.00
cm 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)

2 3 4 5 6
oof - 11.111 - M² 4.1.1.21.a 135,487.00
cm 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
oof 192.487 11.111 2,223.711 M² 4.1.1.21.a 135,487.00
k.10x30 cm (blk.35/60) 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
6 - 11.111 - Kg 4.1.1.19 13,993.65
oof - 11.111 - M² 4.1.1.21.a 135,487.00
up Kolong Uk.10x30 cm (blk.35/6 - 11.111 - M² 4.4.2.3 73,386.90
k. 10x35 (blk.25/55) 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
6 0.363 11.111 4.188 Kg 4.1.1.19 13,993.65
oof 18.140 11.111 209.557 M² 4.1.1.21.a 135,487.00
up Kolong Uk. 10x35 (blk.25/55) 7.250 11.111 83.756 M² 4.4.2.3 73,386.90
k.10/50 (blk.20/40) 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
6 - 11.111 - Kg 4.1.1.19 13,993.65
oof 76.500 11.111 883.767 M² 4.1.1.21.a 135,487.00
up Kolong Uk. 10/50 (blk.20/40) - 11.111 - M² 4.4.2.3 73,386.90
5x45 cm Lt.1 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 8.640 11.111 99.814 Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 a 300,916.00
lom Uk. 45x45 Lt.1 - 11.111 - M² 4.4.2.3 73,386.90
0x30 cm Lt.1 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 a 300,916.00
lom Uk. 30x30 Lt.1 - 11.111 - M² 4.4.2.3 73,386.90
0x20 cm Lt.1 11.111 -
Mix K-250 1,577.156 11.111 18,220.120 M³ B. 13.g.1 2,097,837.50
2 70.308 11.111 812.234 Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 a 300,916.00
lom Uk. 20x20 Lt.1 - 11.111 - M² 4.4.2.3 73,386.90
k.9x9 cm Lt.1 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)

2 3 4 5 6
k.9x9 cm Lt.1 (dinding) 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
726.656 11.111 8,394.703 M² 4.1.1.20.a 135,487.00
Struktur Lantai 1

i2
Uk.15/40 elv. 3.110
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok List 15/40 elv.3.11 - 11.111 - M² 4.4.2.3 73,386.90
lv. 3.110 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
t Plat Dack elv. 3.110 - 11.111 - M² 4.4.2.3 73,386.90
0 cm Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok 35x60 cm Lt.2 - 11.111 - M² 4.4.2.3 73,386.90
5 cm Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Uk. 25x55 cm Lt.2 - 11.111 - M² 4.4.2.3 73,386.90
0 cm Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
0 cm Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 20.959 11.111 242.126 Kg 4.1.1.17.b 18,317.75
4 3,211.200 11.111 37,097.440 Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Uk. 20x40 cm Lt.2 - 11.111 - M² 4.4.2.3 73,386.90
0 cm Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)

2 3 4 5 6
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
5x45 cm (elv.4.00-8.00) Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 0.696 11.111 8.046 Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 b 224,636.50
lom Uk. 45x45 Lt.2 - 11.111 - M² 4.4.2.3 73,386.90
0x30 cm (elv.4.00-8.00) Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 4.530 11.111 52.333 Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 b 224,636.50
lom Uk. 30x30 Lt.2 - 11.111 - M² 4.4.2.3 73,386.90
k.9x9 cm Lt.2 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 0.311 11.111 3.593 Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
k.9x9 cm Lt.2 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
11.111 -
0 cm elv.4.8 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Uk. 15x40 cm elv.4.8 - 11.111 - M² 4.4.2.3 73,386.90
k.9x9 cm elv.4.8 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
v. 4.8 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
t Plat Dack elv. 4.8 - 11.111 - M² 4.4.2.3 73,386.90
11.111 -
v. 6.55 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
Plat Dack elv. 6.55 - 11.111 - M² 4.4.2.3 73,386.90
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)

2 3 4 5 6
11.111 -
5 elv.6.8 11.111 -
Mix K-250 3.645 11.111 42.109 M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
5 elv.6.8 11.111 -
Mix K-250 371.776 11.111 4,294.943 M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 29.432 11.111 340.014 Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Uk. 20x45 elv.6.8 - 11.111 - M² 4.4.2.3 73,386.90
0 elv.6.8 11.111 -
Mix K-250 50.528 11.111 583.726 M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
elv.6.8 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok 547.707 11.111 6,327.389 M² 4.1.1.23.a 307,186.00
ok Uk.15x40 elv.6.8 - 11.111 - M² 4.4.2.3 73,386.90
0x20 cm elv.6.8 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 b 224,636.50
lom Uk. 20x20 elv.6.8 - 11.111 - M² 4.4.2.3 73,386.90
k.9x9 cm elv.6.8 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 195.051 11.111 2,253.330 Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
Plat Dack elv. 6.80 & 7.05 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
t Dack & List Plat Dack elv. 6.8 - 11.111 - M² 4.4.2.3 73,386.90
ack elv. 6.8 - 11.111 - M² 4.4.2.27 44,682.00
g Plat Dack elv. 6.8 - 11.111 - M² 8.1.1.5. 49,500.00
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)

2 3 4 5 6
11.111 -
Uk.15x40 elv.7.05 11.111 -
Mix K-250 471.805 11.111 5,450.537 M³ B. 13.g.1 2,097,837.50
2 116.051 11.111 1,340.681 Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
11.111 -
20x40 cm Elv.7.50 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok 2.708 11.111 31.284 M² 4.1.1.23.a 307,186.00
11.111 -
25x55 cm Elv.8.00 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
tis uk.9x9 cm Elv.8.00 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
11.111 -
20x40 cm Elv.9.80 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 9.986 11.111 115.359 Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Dack uk. 20x40 cm Elv.9.80 - 11.111 - M² 4.4.2.3 73,386.90
90 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
t Dack & List Plat Dack elv. 9.8 - 11.111 - M² 4.4.2.3 73,386.90
ack elv. 9.8 - 11.111 - M² 4.4.2.27 44,682.00
g Plat Dack elv. 9.8 - 11.111 - M² 8.1.1.5. 49,500.00

Struktur Lantai 2
PEKERJAAN STRUKTUR
PLAT LANTAI

Mix K-250 t =12 cm - 11.111 - M³ B. 13.g.1 2,097,837.50


Mix K-250 t = 10 cm 41.039 11.111 474.100 M³ B. 13.g.1 2,097,837.50
xM6 20.503 11.111 236.859 Kg 4.1.1.19 13,993.65
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)

2 3 4 5 6
ntai - 11.111 - M² 4.1.1.24.c 228,613.00
11.111 -
Mix K-250 t =12 cm - 11.111 - M³ B. 13.g.1 2,097,837.50
Mix K-250 t = 10 cm 15.000 11.111 173.288 M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
EKERJAAN PLAT LANTAI
TANGGA
(2 Unit)
. 15x40 cm
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok 103.900 11.111 1,200.308 M² 4.1.1.23.a 307,186.00
ok Bordes 15/40 103.900 11.111 1,200.308 M² 4.4.2.3 73,386.90
11.111 -
Mix K-250 t = 14 cm - 11.111 - M³ B. 13.g.1 2,097,837.50
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
wah Bordes 15/40 - 11.111 - M² 4.4.2.3 73,386.90
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)

2 3 4 5 6
11.111 -
Mix K-250 t = 14 cm - 11.111 - M³ B. 13.g.1 2,097,837.50
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
at - 11.111 - M² 4.1.1.24.a 353,716.00
wah Plat tangga 15/40 - 11.111 - M² 4.4.2.3 73,386.90
11.111 -
Mix K-250 19.671 11.111 227.250 M³ B. 13.g.1 2,097,837.50
6 - 11.111 - Kg 4.1.1.19 13,993.65
- 11.111 - M² 4.1.1.20.a 135,487.00
(1 Unit) 11.111 -
. 15x40 cm 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Bordes 15/40 - 11.111 - M² 4.4.2.3 73,386.90
11.111 -
Mix K-250 t = 14 cm - 11.111 - M³ B. 13.g.1 2,097,837.50
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
wah Bordes 15/40 - 11.111 - M² 4.4.2.3 73,386.90
11.111 -
Mix K-250 t = 14 cm - 11.111 - M³ B. 13.g.1 2,097,837.50
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
at - 11.111 - M² 4.1.1.24.a 353,716.00
wah Plat tangga 15/40 - 11.111 - M² 4.4.2.3 73,386.90
11.111 -
Mix K-250 9.836 11.111 113.625 M³ B. 13.g.1 2,097,837.50
6 - 11.111 - Kg 4.1.1.19 13,993.65
- 11.111 - M² 4.1.1.20.a 135,487.00
PEKERJAAN TANGGA
ATAP
ja Ringan Zincallume - 11.111 - M2 8.1.1.3. 165,000.00
Color t =0,35 mm - 11.111 - M2 A.4.5.2.41.b 235,235.00
ncallume - 11.111 - M A.4.5.2.39. Err:509
plak 2 lps 29.604 11.111 342.005 M 8.1.1.4. 110,000.00
PEKERJAAN ATAP
PENGECATAN

ukur - 11.111 - M2 - 11,190.50


ukur - 11.111 - M2 - 11,190.50
-
ukur - 11.111 - M2 - 11,190.50
ukur - 11.111 - M2 - 11,190.50
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)

2 3 4 5 6
PEKERJAAN PENGECATAN
JUMLAH TOTAL PEKERJAAN STRUKTUR
JUMLAH TOTAL PPN 10 %
JUMLAH TOTAL PEKERJAAN STRUKTUR + PPN 10 %
4.1.1 HARGA SATUAN PEKERJAAN BETON

4.1.1.4 Membuat 1 m³ lantai kerja beton mutu f'c =7,4 Mpa ( K 100), slump (3-6) cm ,w/c =0,87

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 1.200
2 Tukang L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portlan Kg 230.000
2 Pasir Beton Kg 893.000
3 Batu Pecah 1-2 cm Kg 1,027.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

4.1.1.5 Membuat 1 m³ beton mutu f'c =14,5 Mpa ( K 175), slump (12 ± 2) cm ,w/c = 0,66

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 1.650
2 Tukang L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portlan Kg 326.000
2 Pasir Beton Kg 760.000
3 Batu Pecah 1-2 cm Kg 1,029.000
4 Air Liter -
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.1.1.7.a Membuat 1 m³ beton mutu f'c =19,3 Mpa ( K 225), slump (12 ± 2) cm ,w/c = 0,58 (Menggunakan Mo

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 1.323
2 Tukang L.02 OH 0.189
3 Kepala Tukang L.03 OH 0.019
4 Mandor L.04 OH 0.066
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Portlan Kg 371.000
2 Pasir Beton Kg 698.000
3 Batu Pecah 1-2 cm Kg 1,047.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Molen Sewa-hari 0.250
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%

4.1.1.17.a Pembesian 10 Kg dengan besi polos atau besi ulir U 24

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.070
2 Tukang L.02 OH 0.070
3 Kepala Tukang L.03 OH 0.007
4 Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
1 Besi Beton (polos/ulir) U 24 Kg 10.500
2 Kawat Beton Kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (D+E) per 1 kg
4.1.1.17.b Pembesian 10 Kg dengan besi polos atau besi ulir U 32

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.070
2 Tukang L.02 OH 0.070
3 Kepala Tukang L.03 OH 0.007
4 Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
1 Besi Beton (polos/ulir) U32 Kg 10.500
2 Kawat Beton Kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (D+E) per 1 kg

4.1.1.19 Pemasangan 10 Kg jaring kawat baja (wiremesh)

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.025
2 Tukang L.02 OH 0.025
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
1 Wiremesh m6 Kg 10.200
2 Kawat Beton Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (D+E) per 1 kg
4.1.1.20.a Pemasangan 1m² bekisting untuk pondasi (papan mal)

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.520
2 Tukang L.02 OH 0.260
3 Kepala Tukang L.03 OH 0.026
4 Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
1 Papan Mal kelas III m³ 0.013
2 Paku 5 - 10 cm Kg 0.300
3 Cerucuk ф 6-8 cm - panj 4 m Btg 0.125
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

4.1.1.21.a Pemasangan 1m² bekisting untuk sloof (papan mal)

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.520
2 Tukang L.02 OH 0.260
3 Kepala Tukang L.03 OH 0.026
4 Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
1 Papan Mal kelas III m³ 0.013
2 Paku 5 - 10 cm Kg 0.300
3 Cerucuk ф 6-8 cm - panj 4 m Btg 0.125
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.1.1.21.b Pemasangan 1m² bekisting untuk sloof berulang

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.520
2 Tukang L.02 OH 0.260
3 Kepala Tukang L.03 OH 0.026
4 Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
1 Papan Mal kelas III m³ 0.013
2 Paku 5 - 10 cm Kg 0.300
3 Cerucuk ф 6-8 cm - panj 4 m Btg 0.125
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN x 55 %
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

4.1.1.22 a Pemasangan 1m² bekisting untuk kolom (papan mal)

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m³ 0.040
2 Paku 5 - 12 cm Kg 0.400
3 Minyak Bekisting Liter -
4 Balok kayu kelas II m³ 0.015
5 Papan Mal kelas III m³ 0.013
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.1.1.22 b Pemasangan berulang 1m² bekisting untuk kolom (papan mal)

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m³ 0.040
2 Paku 5 - 12 cm Kg 0.400
3 Minyak Bekisting Liter -
4 Balok kayu kelas II m³ 0.015
5 Papan Mal kelas III m³ 0.013
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 2.000
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN x 55 %
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

4.1.1.23.a Pemasangan 1m² bekisting untuk balok (papan mal)

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m³ 0.040
2 Paku 5 - 12 cm Kg 0.400
3 Minyak Bekisting Liter -
4 Balok kayu kelas II m³ 0.018
5 Papan Mal kelas III m³ 0.013
Dolken kayu ɸ(8-10)cm - panj 4 m Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.1.1.23.b Pemasangan berulang 1m² bekisting untuk balok (papan mal)

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m³ 0.040
2 Paku 5 - 12 cm Kg 0.400
3 Minyak Bekisting Liter -
4 Balok kayu kelas II m³ 0.018
5 Papan Mal kelas III m³ 0.013
6 Dolken kayu ɸ(8-10)cm - panj 4 m Batang 2.000
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN x 55 %
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

4.1.1.24.a Pemasangan 1m² bekisting untuk lantai (papan mal)

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m³ 0.040
2 Paku 5 - 12 cm Kg 0.400
3 Minyak Bekisting Liter -
4 Balok kayu kelas II m³ 0.015
5 Papan Mal kelas III m³ 0.013
6 Dolken kayu galam, ɸ(8-10)cm 4 m Batang 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.1.1.24.b Pemasangan berulang 1m² bekisting untuk lantai (papan mal)

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu kelas III m³ 0.040
2 Paku 5 - 12 cm Kg 0.400
3 Minyak Bekisting Liter -
4 Balok kayu kelas II m³ 0.015
5 Papan Mal kelas III m³ 0.013
6 Dolken kayu galam, ɸ(8-10)cm 4 m Batang 6.000
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN x 55 %
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

4.1.1.24.c Pemasangan 1m² bekisting untuk lantai dasar (papan mal)

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
EFISIENSI 50 %
B BAHAN
1 Kayu kelas III m³ 0.040
2 Paku 5 - 12 cm Kg 0.400
3 Minyak Bekisting Liter -
4 Balok kayu kelas II m³ 0.015
5 Papan Mal kelas III m³ 0.013
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 1.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
B. 13.f.1 Membuat 1 m³ beton ready mix K 225 menggunakan pompa

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.100
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix K 225 m³ 1.020
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.f.2 Membuat 1 m³ beton ready mix K 225 tidak menggunakan pompa

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.100
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix K 225 m³ 1.020
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.g.1 Membuat 1 m³ beton ready mix K 250 menggunakan pompa

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.100
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix K 250 m³ 1.020
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
B. 13.i.1 Membuat 1 m³ beton ready mix K 300 menggunakan pompa

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.100
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix K 300 m³ 1.020
JUMLAH HARGA BAHAN
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

B. 13.i.2 Membuat 1 m³ beton ready mix K 300 tidak menggunakan pompa

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang L.02 OH 0.250
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.100
JUMLAH TENAGA KERJA
B BAHAN
1 Beton Ready Mix K 300 m³ 1.020
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.35 Membuat 1m' kolom praktis beton bertulang (11 x 11) cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.180
Tukang batu L.02 OH 0.020
Tukang kayu L.02 OH 0.020
Tukang besi L.02 OH 0.020
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.002
Paku 5 - 12 cm Kg 0.010
Minyak bekisting Liter
Besi beton polos Kg 3.000
Kawat beton Kg 0.450
Semen portland Kg 4.000
Pasir beton Kg 0.006
Batu pecah 1-2 cm Kg 0.009
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Pekerjaan per M3
mutu f'c =7,4 Mpa ( K 100), slump (3-6) cm ,w/c =0,87

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 127,200.00
125,000.00 25,000.00
135,000.00 2,700.00
115,000.00 6,900.00
JUMLAH TENAGA KERJA 161,800.00

1,360.00 312,800.00
57.14 51,028.57
370.37 380,370.37
JUMLAH HARGA BAHAN 744,198.94

JUMLAH HARGA ALAT

905,998.94
90,599.89
996,598.84

Mpa ( K 175), slump (12 ± 2) cm ,w/c = 0,66

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 174,900.00
125,000.00 34,375.00
135,000.00 3,780.00
115,000.00 9,545.00
JUMLAH TENAGA KERJA 222,600.00

1,360.00 443,360.00
57.14 43,428.57
370.37 381,111.11
- -
JUMLAH HARGA BAHAN 867,899.68

JUMLAH HARGA ALAT

1,090,499.68
109,049.97
1,199,549.65
,3 Mpa ( K 225), slump (12 ± 2) cm ,w/c = 0,58 (Menggunakan Molen)

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 140,238.00
125,000.00 23,625.00
135,000.00 2,565.00
115,000.00 7,590.00
JUMLAH TENAGA KERJA 174,018.00

1,360.00 504,560.00
57.14 39,885.71
370.37 387,777.78
JUMLAH HARGA BAHAN 932,223.49

100,000.00 25,000.00
JUMLAH HARGA ALAT 25,000.00

1,131,241.49
113,124.15
1,244,365.64

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 7,420.00
125,000.00 8,750.00
135,000.00 945.00
115,000.00 460.00
JUMLAH TENAGA KERJA 17,575.00

12,500.00 131,250.00
13,000.00 1,950.00
JUMLAH HARGA BAHAN 133,200.00

JUMLAH HARGA ALAT


150,775.00
15,077.50
165,852.50
16,585.25
Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 7,420.00
125,000.00 8,750.00
135,000.00 945.00
115,000.00 460.00
JUMLAH TENAGA KERJA 17,575.00

14,000.00 147,000.00
13,000.00 1,950.00
JUMLAH HARGA BAHAN 148,950.00

JUMLAH HARGA ALAT


166,525.00
16,652.50
183,177.50
18,317.75

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 2,650.00
125,000.00 3,125.00
135,000.00 3,375.00
115,000.00 115.00
JUMLAH TENAGA KERJA 9,265.00

11,500.00 117,300.00
13,000.00 650.00
JUMLAH HARGA BAHAN 117,950.00

JUMLAH HARGA ALAT


127,215.00
12,721.50
139,936.50
13,993.65
Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 55,120.00
125,000.00 32,500.00
135,000.00 3,510.00
115,000.00 2,990.00
JUMLAH TENAGA KERJA 94,120.00

1,800,000.00 23,400.00
15,500.00 4,650.00
8,000.00 1,000.00
JUMLAH HARGA BAHAN 29,050.00

JUMLAH HARGA ALAT

123,170.00
12,317.00
135,487.00

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 55,120.00
125,000.00 32,500.00
135,000.00 3,510.00
115,000.00 2,990.00
JUMLAH TENAGA KERJA 94,120.00

1,800,000.00 23,400.00
15,500.00 4,650.00
8,000.00 1,000.00
JUMLAH HARGA BAHAN 29,050.00

JUMLAH HARGA ALAT

123,170.00
12,317.00
135,487.00
Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 55,120.00
125,000.00 32,500.00
135,000.00 3,510.00
115,000.00 2,990.00
JUMLAH TENAGA KERJA 94,120.00

1,800,000.00 23,400.00
15,500.00 4,650.00
8,000.00 1,000.00
JUMLAH HARGA BAHAN 29,050.00
JUMLAH HARGA BAHAN x 55 % 15,977.50

JUMLAH HARGA ALAT

110,097.50
11,009.75
121,107.25

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00

1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 28,500.00
1,800,000.00 23,400.00
12,000.00 24,000.00
JUMLAH HARGA BAHAN 154,100.00

JUMLAH HARGA ALAT

273,560.00
27,356.00
300,916.00
Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00

1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 28,500.00
1,800,000.00 23,400.00
12,000.00 24,000.00
JUMLAH HARGA BAHAN 154,100.00
JUMLAH HARGA BAHAN x 55 % 84,755.00

JUMLAH HARGA ALAT

204,215.00
20,421.50
224,636.50

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00

1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 34,200.00
1,800,000.00 23,400.00
12,000.00 24,000.00
JUMLAH HARGA BAHAN 159,800.00

JUMLAH HARGA ALAT -


279,260.00
27,926.00
307,186.00
Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00

1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 34,200.00
1,800,000.00 23,400.00
12,000.00 24,000.00
JUMLAH HARGA BAHAN 159,800.00
JUMLAH HARGA BAHAN x 55 % 87,890.00

JUMLAH HARGA ALAT -

207,350.00
20,735.00
228,085.00

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00

1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 28,500.00
1,800,000.00 23,400.00
12,000.00 72,000.00
JUMLAH HARGA BAHAN 202,100.00

JUMLAH HARGA ALAT -


321,560.00
32,156.00
353,716.00
Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00

1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 28,500.00
1,800,000.00 23,400.00
12,000.00 72,000.00
JUMLAH HARGA BAHAN 202,100.00
JUMLAH HARGA BAHAN x 55 % 111,155.00

JUMLAH HARGA ALAT -

230,615.00
23,061.50
253,676.50

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00
59,730.00

1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 28,500.00
1,800,000.00 23,400.00
12,000.00 18,000.00
JUMLAH HARGA BAHAN 148,100.00
JUMLAH HARGA ALAT

207,830.00
20,783.00
228,613.00
Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 106,000.00
125,000.00 31,250.00
135,000.00 3,375.00
115,000.00 11,500.00
JUMLAH TENAGA KERJA 152,125.00

1,200,000.00 1,224,000.00
JUMLAH HARGA BAHAN 1,224,000.00

4,000,000.00 480,000.00
JUMLAH HARGA ALAT 480,000.00

1,856,125.00
185,612.50
2,041,737.50

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 106,000.00
125,000.00 31,250.00
135,000.00 3,375.00
115,000.00 11,500.00
JUMLAH TENAGA KERJA 152,125.00

1,200,000.00 1,224,000.00
JUMLAH HARGA BAHAN 1,224,000.00

JUMLAH HARGA ALAT -


1,376,125.00
137,612.50
1,513,737.50

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 106,000.00
125,000.00 31,250.00
135,000.00 3,375.00
115,000.00 11,500.00
JUMLAH TENAGA KERJA 152,125.00

1,250,000.00 1,275,000.00
JUMLAH HARGA BAHAN 1,275,000.00

4,000,000.00 480,000.00
JUMLAH HARGA ALAT 480,000.00
1,907,125.00
190,712.50
2,097,837.50
Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 106,000.00
125,000.00 31,250.00
135,000.00 3,375.00
115,000.00 11,500.00
JUMLAH TENAGA KERJA 152,125.00

1,350,000.00 1,377,000.00
JUMLAH HARGA BAHAN 1,377,000.00

4,000,000.00 480,000.00
JUMLAH HARGA ALAT 480,000.00
2,009,125.00
200,912.50
2,210,037.50

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 106,000.00
125,000.00 31,250.00
135,000.00 3,375.00
115,000.00 11,500.00
JUMLAH TENAGA KERJA 152,125.00

1,350,000.00 1,377,000.00
JUMLAH HARGA BAHAN 1,377,000.00

JUMLAH HARGA ALAT -

1,529,125.00
152,912.50
1,682,037.50
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

106,000.00 19,080.00
125,000.00 2,500.00
125,000.00 2,500.00
125,000.00 2,500.00
135,000.00 810.00
115,000.00 1,035.00
JUMLAH TENAGA KERJA 28,425.00

1,800,000.00 3,600.00
15,500.00 155.00
-
12,500.00 37,500.00
13,000.00 5,850.00
1,360.00 5,440.00
57.14 0.34
370.37 3.33
JUMLAH HARGA BAHAN 52,548.68

-
JUMLAH HARGA ALAT -
80,973.68
10% x D 8,097.37
89,071.04
7,361,243.29
A.4.2.1 Harga Satuan Pekerjaan Besi dan Alumunium

A.4.2.1.11 Pemasangan 1 m kusen pintu allumunium


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.043 106,000.00
Tukang khusus alumunium L.03 OH 0.043 125,000.00
Kepala tukang L.03 OH 0.0043 135,000.00
Mandor L.04 OH 0.0021 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil alumunium m 1.100 78,000.00
skrup fixer buah 2.000 600.00
Sealant Tube 0.060 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.13.b Pemasangan 1 m2 pintu kaca 5 mm rangka allumunium


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.085 106,000.00
Tukang alumunium / kaca L.03 OH 0.085 125,000.00
Kepala tukang L.03 OH 0.009 135,000.00
Mandor L.04 OH 0.005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu alumunium m 4.400 70,000.00
Profil kaca 5 mm m2 1.100 160,000.00
Sealant Tube 0.270 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.2.1.20.a Pemasangan 1 m2 Railing Tangga
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.250 106,000.00
Tukang besi L.02 OH 0.250 125,000.00
Kepala tukang L.03 OH 0.025 135,000.00
Mandor L.04 OH 0.013 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka railling M1 6.800 26,000.00
Assesoris ( perkuatan, las, dll) Ls 100%xrangka 176,800.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.2.1.20.b Pemasangan 1 m' Railing stainless


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.250 106,000.00
Tukang besi L.02 OH 0.250 125,000.00
Kepala tukang L.03 OH 0.025 135,000.00
Mandor L.04 OH 0.013 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka stainless M1 1.050 121,275.00
Assesoris ( perkuatan, las, dll) Ls 100%xrangka 127,338.75
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

4,558.00
5,375.00
580.50
241.50
10,755.00

85,800.00
1,200.00
2,100.00
89,100.00

-
-
99,855.00
9,985.50
109,840.50

Jumlah Harga
(Rp.)

9,010.00
10,625.00
1,215.00
575.00
21,425.00

308,000.00
176,000.00
9,450.00
493,450.00

-
-
514,875.00
51,487.50
566,362.50
Jumlah Harga
(Rp.)

26,500.00
31,250.00
3,375.00
1,495.00
62,620.00

176,800.00
176,800.00
353,600.00

416,220.00
41,622.00
457,842.00

Jumlah Harga
(Rp.)

26,500.00
31,250.00
3,375.00
1,495.00
62,620.00

127,338.75
127,338.75
254,677.50

317,297.50
31,729.75
349,027.25
HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.41.b Pemasangan 1 m2 atap Zincalum Warna 0.35

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.750
Kepala tukang L.11 OH 0.080
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Zincalume Persegi Gelombang Warna 0,35 Lbr 1.050
Paku hak panjang 15 cm (Sekrup Zincalum) Kg 0.020
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.2.42.a Pemasangan 1 m' nok Zincalum 0,35

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 1.000
Kepala tukang L.11 OH 0.100
Mandor L.15 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Nok/Prabung Steel Sheet 0.35 lebar 333 mm Buah 1.200
Paku hak panjang 15 cm (Sekrup Zincalum) Kg 0.040
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
ATUAN PEKERJAAN PENUTUP ATAP

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

106,000.00 15,900.00
125,000.00 93,750.00
135,000.00 10,800.00
115,000.00 690.00
JUMLAH TENAGA KERJA 121,140.00

88,000.00 92,400.00
15,500.00 310.00
JUMLAH HARGA BAHAN 92,710.00

JUMLAH HARGA ALAT


213,850.00
10% x D 21,385.00
) 235,235.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

106,000.00 10,600.00
125,000.00 125,000.00
135,000.00 13,500.00
115,000.00 5,750.00
JUMLAH TENAGA KERJA 154,850.00

29,480.00 35,376.00
15,500.00 620.00
JUMLAH HARGA BAHAN 35,996.00

JUMLAH HARGA ALAT


190,846.00
10% x D 19,084.60
) 209,930.60
4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING

4.4.1.19.a Pemasangan 1 m² dinding batako 15/30/7

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A TENAGA
1 Pekerja L.01 OH 0.320 106,000.00
2 Tukang batu L.02 OH 0.120 125,000.00
3 Kepala Tukang L.03 OH 0.012 135,000.00
4 Mandor L.04 OH 0.016 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Batako 15/30/7 (cetak mesin) Bh 22.222 1,300.00
2 Semen Portland Kg 7.500 1,360.00
3 Pasir pasang m³ 0.027 80,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)

33,920.00
15,000.00
1,620.00
1,840.00
52,380.00

28,888.60
10,200.00
2,160.00
41,248.60

93,628.60
9,362.86
102,991.46
4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

4.4.2.4 Pemasangan 1 m² plesteran 1SP:4PP tebal 15mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A TENAGA
1 Pekerja L.01 OH 0.300 106,000.00
2 Tukang batu L.03 OH 0.150 125,000.00
3 Kepala Tukang L.03 OH 0.015 135,000.00
4 Mandor L.04 OH 0.015 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 6.240 1,360.00
2 Pasir (PP) m³ 0.024 80,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

4.4.2.27 Pemasangan 1 m² acian

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A TENAGA
1 Pekerja L.01 OH 0.200 106,000.00
2 Tukang batu L.03 OH 0.100 125,000.00
3 Kepala Tukang L.03 OH 0.010 135,000.00
4 Mandor L.04 OH 0.010 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen PC Kg 3.250 1,360.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)

31,800.00
18,750.00
2,025.00
1,725.00
54,300.00

8,486.40
1,920.00
10,406.40

64,706.40
6,470.64
71,177.04

Jumlah Harga (Rp)

21,200.00
12,500.00
1,350.00
1,150.00
36,200.00

4,420.00
4,420.00

40,620.00
4,062.00
44,682.00
4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.34.a Pemasangan 1 m2 lantai keramik ukuran 60 x 60 cm Polish

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik 60x60 cm Polished (ex Indogres) m2 1.050
Semen portland Kg 8.190
Pasir pasang m3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.34.b Pemasangan 1 m2 lantai keramik ukuran 60 x 60 cm Unpolish (setara indogres)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik 60x60 cm Unpolished (ex Indogres) m2 1.050
Semen portland Kg 8.190
Pasir pasang m3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.35 Pemasangan 1 m2 lantai keramik ukuran 30 x 30 cm Polish

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 cm Polish (ex Roman) m2 1.050
Semen portland Kg 10.000
Pasir pasang m3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.35.a Pemasangan 1 m2 lantai keramik ukuran 30 x 30 cm Unpolish

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 cm Unpolish (ex Roman) m2 1.050
Semen portland Kg 10.000
Pasir pasang m3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.41 Pemasangan 1 m' plint keramik ukuran 5cmx20cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.300
Semen portland Kg 0.570
Pasir pasang m3 0.0015
Semen warna Kg 0.013
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

4.4.3.54.a Pemasangan 1 m² dinding keramik 20 cm x 40 cm

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.900
2 Tukang batu L.02 OH 0.450
3 Kepala Tukang L.03 OH 0.045
4 Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
1 Keramik 20 x 40 cm Bh 12.500
2 Semen portlan Kg 9.300
3 Pasir pasng m³ 0.018
4 Semen warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.59.a Pemasangan 1 m2 lantai vynil
No Uraian Kode Satuan Koefisien
A TENAGA
1 Pekerja L.01 OH 0.150
2 Tukang batu L.02 OH 0.150
3 Kepala Tukang L.03 OH 0.015
4 Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
1 Vynil m2 1.050
2 Lem dan leveling m2 1.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.21 Pemasangan 1 m’ plint ubin warna ukuran 10 cm x 40 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 2.650
Semen portland Kg 1.140
Pasir pasang m3 0.003
Semen warna Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

106,000.00 74,200.00
125,000.00 43,750.00
135,000.00 4,725.00
115,000.00 4,025.00
JUMLAH TENAGA KERJA 126,700.00

200,000.00 210,000.00
1,360.00 11,138.40
80,000.00 3,600.00
14,000.00 7,000.00
JUMLAH HARGA BAHAN 231,738.40

JUMLAH HARGA ALAT


358,438.40
10% x D 35,843.84
E) 394,282.24

mik ukuran 60 x 60 cm Unpolish (setara indogres)


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

106,000.00 74,200.00
125,000.00 43,750.00
135,000.00 4,725.00
115,000.00 4,025.00
JUMLAH TENAGA KERJA 126,700.00

198,000.00 207,900.00
1,360.00 11,138.40
80,000.00 3,600.00
14,000.00 7,000.00
JUMLAH HARGA BAHAN 229,638.40

JUMLAH HARGA ALAT


356,338.40
10% x D 35,633.84
E) 391,972.24
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

106,000.00 74,200.00
125,000.00 43,750.00
135,000.00 4,725.00
115,000.00 4,025.00
JUMLAH TENAGA KERJA 126,700.00

98,000.00 102,900.00
1,360.00 13,600.00
80,000.00 3,600.00
14,000.00 7,000.00
JUMLAH HARGA BAHAN 127,100.00

JUMLAH HARGA ALAT


253,800.00
10% x D 25,380.00
E) 279,180.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

106,000.00 74,200.00
125,000.00 43,750.00
135,000.00 4,725.00
115,000.00 4,025.00
JUMLAH TENAGA KERJA 126,700.00

96,000.00 100,800.00
1,360.00 13,600.00
80,000.00 3,600.00
14,000.00 7,000.00
JUMLAH HARGA BAHAN 125,000.00

JUMLAH HARGA ALAT


251,700.00
10% x D 25,170.00
E) 276,870.00
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

106,000.00 9,540.00
125,000.00 11,250.00
135,000.00 4,725.00
115,000.00 575.00
JUMLAH TENAGA KERJA 26,090.00

9,400.00 49,820.00
1,360.00 775.20
80,000.00 120.00
14,000.00 182.00
JUMLAH HARGA BAHAN 50,897.20

JUMLAH HARGA ALAT -


76,987.20
10% x D 7,698.72
E) 84,685.92

Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 95,400.00
125,000.00 56,250.00
135,000.00 6,075.00
115,000.00 5,175.00
JUMLAH TENAGA KERJA 162,900.00

8,800.00 110,000.00
1,360.00 12,648.00
80,000.00 1,440.00
14,000.00 27,160.00
JUMLAH HARGA BAHAN 151,248.00

JUMLAH HARGA ALAT


314,148.00
31,414.80
345,562.80
Harga Satuan (Rp) Jumlah Harga (Rp)

106,000.00 15,900.00
125,000.00 18,750.00
135,000.00 2,025.00
115,000.00 920.00
JUMLAH TENAGA KERJA 37,595.00

550,000.00 577,500.00
85,000.00 89,250.00
JUMLAH HARGA BAHAN 666,750.00

JUMLAH HARGA ALAT

704,345.00
70,434.50
774,779.50

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

106,000.00 9,540.00
125,000.00 11,250.00
135,000.00 1,215.00
115,000.00 575.00
JUMLAH TENAGA KERJA 22,580.00

3,900.00 10,335.00
1,360.00 1,550.40
80,000.00 240.00
14,000.00 1,400.00
JUMLAH HARGA BAHAN 13,525.40

JUMLAH HARGA ALAT -


36,105.40
10% x D 3,610.54
E) 39,715.94
SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9)mm, tebal 9 mm + Rangka

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA K
B BAHAN
Gypsum board Lembar 0.364
Paku skrup Kg 0.110
Rangka Plafond Metal Furing m2 1.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA
D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.1.7.a Pemasangan 1 m2 langit-langit GRC ukuran 120 x 240 mm tebal 4 mm + Rangka Plafon Metal Furing

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA K
B BAHAN
GRC tebal 4 mm Lembar 0.364
Paku skrup Kg 0.110
Rangka Plafond Metal Furing m2 1.000
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA
D Jumlah (A + B + C)

Pekerjaan Langit-Langit 460


E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

Pekerjaan Langit-Langit 461


ERJAAN LANGIT-LANGIT (PLAFOND)

gypsum board ukuran (120x240x9)mm, tebal 9 mm + Rangka Plafond Metal Furing


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

106,000.00 10,600.00
125,000.00 6,250.00
135,000.00 675.00
115,000.00 575.00
JUMLAH TENAGA KERJA 18,100.00

71,000.00 25,844.00
53,000.00 5,830.00
120,000.00 120,000.00
JUMLAH HARGA BAHAN 151,674.00

JUMLAH HARGA ALAT


169,774.00
10% x D 16,977.40
186,751.40

uran 120 x 240 mm tebal 4 mm + Rangka Plafon Metal Furing


Harga Satuan Jumlah Harga
(Rp.) (Rp.)

106,000.00 10,600.00
125,000.00 6,250.00
135,000.00 675.00
115,000.00 575.00
JUMLAH TENAGA KERJA 18,100.00

70,000.00 25,480.00
53,000.00 5,830.00
120,000.00 120,000.00
JUMLAH HARGA BAHAN 151,310.00

JUMLAH HARGA ALAT


169,410.00

Pekerjaan Langit-Langit 462


10% x D 16,941.00
186,351.00

Pekerjaan Langit-Langit 463


A.4.6.2 Harga Satuan Pekerjaan Kunci dan Kaca

A.4.6.2.1.a Pemasangan 1 buah kunci tanam 2 slaag


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.060 106,000.00
Tukang Kayu L.02 OH 0.600 125,000.00
Kepala Tukang L.03 OH 0.060 135,000.00
Mandor L.04 OH 0.003 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam 2 slaag buah 1.000 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.4.a Pemasangan 1 buah kunci Jendela


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.005 106,000.00
Tukang Kayu L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.050 135,000.00
Mandor L.04 OH 0.003 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci Jendela buah 1.000 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.2.5 Pemasangan 1 buah engsel pintu
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.015 106,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 135,000.00
Mandor L.04 OH 0.0008 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel pintu buah 1.000 10,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 106,000.00
Tukang Kayu L.02 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 135,000.00
Mandor L.04 OH 0.0005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel kupu-kupu buah 1.000 8,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.2.9 Pemasangan 1 buah kait angin
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.015 106,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 135,000.00
Mandor L.04 OH 0.008 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kait angin buah 1.000 7,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.10 Pemasangan 1 buah door closer


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.050 106,000.00
Tukang Kayu L.02 OH 0.500 125,000.00
Kepala Tukang L.03 OH 0.050 135,000.00
Mandor L.04 OH 0.003 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door closer set 1.000 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.2.11.a Pemasangan 1 pasang Handle Pintu
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 106,000.00
Tukang Kayu L.02 OH 0.200 125,000.00
Kepala Tukang L.03 OH 0.020 135,000.00
Mandor L.04 OH 0.001 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Handle Pintu buah 1.000 80,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.11.b Pemasangan 1 pasang Handle Jendela


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 106,000.00
Tukang Kayu L.02 OH 0.200 125,000.00
Kepala Tukang L.03 OH 0.020 135,000.00
Mandor L.04 OH 0.001 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Handle Jendela buah 1.000 15,400.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.2.13 Pemasangan 1 buah door stop
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 106,000.00
Tukang Kayu L.02 OH 0.100 125,000.00
Kepala Tukang L.03 OH 0.010 135,000.00
Mandor L.04 OH 0.005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door stop buah 1.000 250,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.17 Pemasangan 1m2 kaca tebal 5 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.015 106,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 135,000.00
Mandor L.04 OH 0.0008 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.100 160,000.00
Sealant kg 0.050 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.2.18 Pemasangan 1m2 kaca tebal 8 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.017 106,000.00
Tukang Kayu L.02 OH 0.170 125,000.00
Kepala Tukang L.03 OH 0.017 135,000.00
Mandor L.04 OH 0.0009 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1.100 398,000.00
Sealant kg 0.07 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.6.2.20 Pemasangan 1m2 kaca cermin tebal 5 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.015 106,000.00
Tukang Kayu L.02 OH 0.150 125,000.00
Kepala Tukang L.03 OH 0.015 135,000.00
Mandor L.04 OH 0.008 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 5 mm m2 1.100 418,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

6,360.00
75,000.00
8,100.00
345.00
89,805.00

130,000.00
130,000.00

-
219,805.00
21,980.50
241,785.50

Jumlah Harga
(Rp.)

530.00
62,500.00
6,750.00
345.00
70,125.00

9,000.00
9,000.00

-
79,125.00
7,912.50
87,037.50
Jumlah Harga
(Rp.)

1,590.00
18,750.00
2,025.00
92.00
22,457.00

10,000.00
10,000.00

-
32,457.00
3,245.70
35,702.70

Jumlah Harga
(Rp.)

1,060.00
12,500.00
1,350.00
57.50
14,967.50

8,000.00
8,000.00

-
22,967.50
2,296.75
25,264.25
Jumlah Harga
(Rp.)

1,590.00
18,750.00
2,025.00
920.00
23,285.00

7,500.00
7,500.00

30,785.00
3,078.50
33,863.50

Jumlah Harga
(Rp.)

5,300.00
62,500.00
6,750.00
345.00
74,895.00

150,000.00
150,000.00

224,895.00
22,489.50
247,384.50
Jumlah Harga
(Rp.)

2,120.00
25,000.00
2,700.00
115.00
29,935.00

80,000.00
80,000.00

109,935.00
10,993.50
120,928.50

Jumlah Harga (Rp.)

2,120.00
25,000.00
2,700.00
115.00
29,935.00

15,400.00
15,400.00

45,335.00
4,533.50
49,868.50
Jumlah Harga (Rp.)

1,060.00
12,500.00
1,350.00
575.00
15,485.00

250,000.00
250,000.00

-
265,485.00
26,548.50
292,033.50

Jumlah Harga
(Rp.)

1,590.00
18,750.00
2,025.00
92.00
22,457.00

176,000.00
1,750.00
177,750.00

-
200,207.00
20,020.70
220,227.70
Jumlah Harga
(Rp.)

1,802.00
21,250.00
2,295.00
103.50
25,450.50

437,800.00
2,450.00
440,250.00

-
465,700.50
46,570.05
512,270.55

Jumlah Harga
(Rp.)

1,590.00
18,750.00
2,025.00
920.00
23,285.00

459,800.00
459,800.00

-
483,085.00
48,308.50
531,393.50
A.4.7.1 Harga Satuan Pekerjaan Pengecatan

A.4.7.1.10.a 1m2 Pengecatan tembok baru Interior


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 106,000.00
Tukang cat L.02 OH 0.063 125,000.00
Kepala tukang L.03 OH 0.0063 135,000.00
Mandor L.04 OH 0.003 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamur Kg 0.100 12,000.00
Cat dasar Kg 0.100 12,750.00
Cat penutup Kg 0.260 56,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.10.b 1m2 Pengecatan tembok baru Exterior


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 106,000.00
Tukang cat L.02 OH 0.063 125,000.00
Kepala tukang L.03 OH 0.0063 135,000.00
Mandor L.04 OH 0.003 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamur Kg 0.100 12,000.00
Cat dasar Kg 0.100 12,750.00
Cat penutup Kg 0.260 50,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.10.f 1m2 Pengecatan tembok baru waterproofing
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 106,000.00
Tukang cat L.02 OH 0.063 125,000.00
Kepala tukang L.03 OH 0.0063 135,000.00
Mandor L.04 OH 0.003 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Alkali Kg 0.100 12,750.00
Cat Waterproofing Kg 0.260 45,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

2,120.00
7,875.00
850.50
345.00
11,190.50

1,200.00
1,275.00
14,560.00
17,035.00

-
28,225.50
2,822.55
31,048.05

Jumlah Harga
(Rp.)

2,120.00
7,875.00
850.50
345.00
11,190.50

1,200.00
1,275.00
13,000.00
15,475.00

-
26,665.50
2,666.55
29,332.05
Jumlah Harga
(Rp.)

2,120.00
7,875.00
850.50
345.00
11,190.50

1,275.00
11,700.00
12,975.00

-
24,165.50
2,416.55
26,582.05
A.5.1.1 Harga Satuan Pekerjaan Sanitasi Dalam Gedung

A.5.1.1.1 (K3) Pemasangan 1 buah closet duduk/ monoblock


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.300 106,000.00
Tukang batu L.02 OH 1.100 125,000.00
Kepala tukang L.03 OH 0.010 135,000.00
Mandor L.04 OH 0.160 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closet duduk Unit 1.000 2,000,000.00
Perlengkapan Ls 6% x closet 120,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.1.a (K3) Pemasangan 1 buah Spoel Hoek


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 3.300 106,000.00
Tukang batu L.02 OH 1.100 125,000.00
Kepala tukang L.03 OH 0.010 135,000.00
Mandor L.04 OH 0.160 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Slop Sink/ Spoel Hoek Unit 1.000 4,000,000.00
Perlengkapan Ls 6% x closet 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.5 (K3) Pemasangan 1 buah westafel tipe 1
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.200 106,000.00
Tukang batu L.02 OH 1.450 125,000.00
Kepala tukang L.03 OH 0.150 135,000.00
Mandor L.04 OH 0.060 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Westafel Unit 1.200 550,000.00
Semen Portland Kg 6.000 1,360.00
Pasir pasang M3 0.010 80,000.00
Perlengkapan % 12.000 550,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.5.a (K3) Pemasangan 1 buah westafel tipe 2


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.200 106,000.00
Tukang batu L.02 OH 1.450 125,000.00
Kepala tukang L.03 OH 0.150 135,000.00
Mandor L.04 OH 0.060 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Westafel Unit 1.200 450,000.00
Semen Portland Kg 6.000 1,360.00
Pasir pasang M3 0.010 80,000.00
Perlengkapan % 12.000 450,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.5.b (K3) Pemasangan 1 buah Tempat Cuci Bayi
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 1.200 106,000.00
Tukang batu L.02 OH 1.450 125,000.00
Kepala tukang L.03 OH 0.150 135,000.00
Mandor L.04 OH 0.060 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Tempat Cuci Bayi Unit 1.200 550,000.00
Semen Portland Kg 6.000 1,360.00
Pasir pasang M3 0.010 80,000.00
Perlengkapan % 12.000 550,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.12 Pemasangan 1 buah bak cuci piring stainlessteel


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.030 106,000.00
Tukang batu L.02 OH 0.300 125,000.00
Kepala tukang L.03 OH 0.030 135,000.00
Mandor L.04 OH 0.015 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bak cuci piring Unit 1.000 650,000.00
Waterdrain buah 1.000 319,100.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.14 Pemasangan 1 buah floor drain
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 106,000.00
Tukang batu L.02 OH 0.100 125,000.00
Kepala tukang L.03 OH 0.010 135,000.00
Mandor L.04 OH 0.005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Floordrain Unit 1.000 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.19 Pemasangan 1 buah kran diameter 1/2" atau 3/4"


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 106,000.00
Tukang batu L.02 OH 0.400 125,000.00
Kepala tukang L.03 OH 0.040 135,000.00
Mandor L.04 OH 0.005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kran air M 1.000 30,000.00
Sealtape Buah 0.025 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.19.a Pemasangan 1 buah Jet Washer
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 106,000.00
Tukang batu L.02 OH 0.400 125,000.00
Kepala tukang L.03 OH 0.040 135,000.00
Mandor L.04 OH 0.005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Jet Washer Unit 1.000 245,000.00
Sealtape Buah 0.025 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )

A.5.1.1.19.b Pemasangan 1 buah Fix Shower


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 106,000.00
Tukang batu L.02 OH 0.400 125,000.00
Kepala tukang L.03 OH 0.040 135,000.00
Mandor L.04 OH 0.005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Fix Shower M 1.000 170,000.00
Sealtape Buah 0.025 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.19.c Pemasangan 1 buah Hand Shower
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.010 106,000.00
Tukang batu L.02 OH 0.400 125,000.00
Kepala tukang L.03 OH 0.040 135,000.00
Mandor L.04 OH 0.005 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Hand Shower M 1.000 500,000.00
Sealtape Buah 0.025 3,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp.)

349,800.00
137,500.00
1,350.00
18,400.00
507,050.00

2,000,000.00
7,200.00
2,007,200.00

-
-
2,514,250.00
251,425.00
2,765,675.00

Jumlah Harga
(Rp.)

349,800.00
137,500.00
1,350.00
18,400.00
507,050.00

4,000,000.00
14,400.00
4,014,400.00

-
-
4,521,450.00
452,145.00
4,973,595.00
Jumlah Harga
(Rp.)

127,200.00
181,250.00
20,250.00
6,900.00
335,600.00

660,000.00
8,160.00
800.00
66,000.00
734,960.00

-
-
1,070,560.00
107,056.00
1,177,616.00

Jumlah Harga
(Rp.)

127,200.00
181,250.00
20,250.00
6,900.00
335,600.00

540,000.00
8,160.00
800.00
54,000.00
602,960.00

-
-
938,560.00
93,856.00
1,032,416.00
Jumlah Harga
(Rp.)

127,200.00
181,250.00
20,250.00
6,900.00
335,600.00

660,000.00
8,160.00
800.00
66,000.00
734,960.00

-
-
1,070,560.00
107,056.00
1,177,616.00

Jumlah Harga
(Rp.)

3,180.00
37,500.00
4,050.00
1,725.00
46,455.00

650,000.00
319,100.00
969,100.00

-
-
1,015,555.00
101,555.50
1,117,110.50
Jumlah Harga
(Rp.)

1,060.00
12,500.00
1,350.00
575.00
14,910.00

15,000.00
15,000.00

-
-
29,910.00
2,991.00
32,901.00

Jumlah Harga
(Rp.)

1,060.00
50,000.00
5,400.00
575.00
57,035.00

30,000.00
87.50
30,087.50

-
-
87,122.50
8,712.25
95,834.75
Jumlah Harga
(Rp.)

1,060.00
50,000.00
5,400.00
575.00
57,035.00

245,000.00
87.50
245,087.50

-
-
302,122.50
30,212.25
332,334.75

Jumlah Harga
(Rp.)

1,060.00
50,000.00
5,400.00
575.00
57,035.00

170,000.00
87.50
170,087.50

-
-
227,122.50
22,712.25
249,834.75
Jumlah Harga
(Rp.)

1,060.00
50,000.00
5,400.00
575.00
57,035.00

500,000.00
87.50
500,087.50

-
-
557,122.50
55,712.25
612,834.75
HARGA SATUAN OVERHEAD DAN PROFIT (8.1.1.)

8.1.1.3. 1 M² Pemasangan Kuda-kuda Atap Baja Ringan

No Uraian Satuan Koefisien Harga Satuan (Rp)

A TENAGA

JUMLAH TENAGA KERJA


B BAHAN
1 Rangka Baja Ringan Zincalume (truss/polos) M² 1.00 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Ovrhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

8.1.1.4. 1 M' Pemasangan Wood Plank 1 Lapis

No Uraian Satuan Koefisien Harga Satuan (Rp)

A TENAGA

JUMLAH TENAGA KERJA


B BAHAN
1 Wood Plank M' 1.00 50,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Ovrhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
N OVERHEAD DAN PROFIT (8.1.1.)

Jumlah Harga (Rp)

150,000.00
150,000.00

150,000.00
15,000.00
165,000.00

Jumlah Harga (Rp)

50,000.00
50,000.00

50,000.00
5,000.00
55,000.00
Harga Satuan Pekerjaan Timbal

1 m2 Dinding Timbal Pelapis (PB) 2 mm + Partisi Gypsum


HARGA
No. URAIAN PEKERJAAN SAT SATUAN
( Rp. )
1 2 3 4.00

1 Timbal Pelapis (PB) 2 mm Dinding R. X-Ray M2 1,550,000.00


2 Rangka Partisi M2 120,000.00
3 Gypsum t = 12 mm M2 23,851.12

Jumlah
overhead + provit 10%
BIAYA
KUANTITAS SATUAN
( Rp. )
5.00 6.00

1.00 1,550,000.00
1.00 120,000.00
1.00 23,851.12

1,693,851.12
overhead + provit 10% 169,385.11
1,863,000.00
Harga Satuan Pekerjaan R. RAD

A.RAD.05 Pemasangan 1 Unit JR1-2 PB Glass (1200x700)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)

Jendela PB Glass (1200x700) mm Unit 1.000 54,600,000.00


Accessoris & Instalasi Ls 15%xUnit 8,190,000.00

JUMLAH HARGA ALAT


A Jumlah
B Overhead & Provit 10% x D
C Harga Satuan Pekerjaan ( A + B )
Jumlah Harga
(Rp.)

54,600,000.00
8,190,000.00

62,790,000.00
62,790,000.00
6,279,000.00
69,069,000.00
PERHITUNGAN VOLUM
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM

I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi 39.000 x 26.000 = 1,014.000 M2

2 Pemasangan Bowplank 41.000 + 28.000 = 69.000 x 2.000 =

II. PEKERJAAN PONDASI

1 Minipile 20 x 20 x 600 11.000 ttk x 1.000 = 11.000 x 3.000 =


165.000 ttk x 1.000 = 165.000 x 3.000 =
176.000

2 Pemancangan = 11.000 x 6.000 x


= 165.000 x 6.000 x

3 Pembobokan 176.000 Titk

P1 A P1 B P2 P3
A'
A''
A 1.000
B 1.000
C 1.000
C' 1.000
D 2.00 5.000
11.000 4.000 2.000 9.000
11.000 4.000 4.000 27.000

4 Galian Tanah P1A 11.000 ttk x 0.700 x 0.700 x 0.750 =


P1B 4.000 ttk x 0.700 x 0.700 x 0.750 =
P2 2.000 ttk x 0.800 x 1.400 x 0.750 =
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
P3 9.000 ttk x 1.400 x 1.400 x 0.750 =
P4 7.000 ttk x 1.400 x 1.400 x 0.750 =
P5 17.000 ttk x 2.000 x 1.400 x 0.750 =
50.000

5 Urugan Pasir t = 10 cm P1A 11.000 ttk x 0.700 x 0.700 x 0.100 =


P1B 4.000 ttk x 0.700 x 0.700 x 0.100 =
P2 2.000 ttk x 0.600 x 1.200 x 0.100 =
P3 9.000 ttk x 1.200 x 1.200 x 0.100 =
P4 7.000 ttk x 1.200 x 1.200 x 0.100 =
P5 17.000 ttk x 1.800 x 1.200 x 0.100 =

7 Lantai Kerja t = 5 cm P1A 11.000 ttk x 0.500 x 0.500 x 0.050 =


P1B 4.000 ttk x 0.500 x 0.500 x 0.050 =
P2 2.000 ttk x 0.600 x 1.200 x 0.050 =
P3 9.000 ttk x 1.200 x 1.200 x 0.050 =
P4 7.000 ttk x 1.200 x 1.200 x 0.050 =
P5 17.000 ttk x 1.800 x 1.200 x 0.050 =

8 Pondasi Type P1 beton 0.600 x 0.600 x 0.600 = 0.216 x


Tulangan
Dia 16 4.000 x 2.200 x 1.040 = 9.152
4.000 x 2.200 x 1.040 = 9.152
4.000 x 2.200 x 1.040 = 9.152 +
27.456 x

Bekisting 1.200 mx 0.600 mx 2.000 = 1.440 x


NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
8 Pondasi Type P2 beton 0.600 x 1.200 x 0.600 = 0.432 x
Tulangan
Dia 16 8.000 x 2.200 x 1.040 = 18.304
4.000 x 3.400 x 1.040 = 14.144
4.000 x 3.400 x 1.040 = 14.144 +
46.592 x

Bekisting 1.800 mx 0.600 mx 2.000 = 2.160 x

9 Pondasi Type P3 beton 0.600 x 1.200 x 0.600 = 0.432


0.500 x 1.800 x 0.600 = 0.540 +
0.972 x
Tulangan
Dia 13 2.000 x 2.300 x 1.040 = 4.784
4.000 x 3.400 x 1.040 = 14.144
2.000 x 2.900 x 1.040 = 6.032
4.000 x 3.400 x 1.040 = 14.144
1.000 x 2.300 x 1.040 = 2.392
1.000 x 2.600 x 1.040 = 2.704
1.000 x 2.900 x 1.040 = 3.016
1.000 x 2.900 x 1.040 = 3.016
4.000 x 3.150 x 1.040 = 13.104
63.336 x

Bekisting 1.800 mx 0.600 mx 2.000 = 2.160 x

8 Pondasi Type P4 beton 1.200 x 1.200 x 0.600 = 0.864 +


0.864 x
Tulangan
Dia 16 8.000 x 3.400 x 1.040 = 28.288
8.000 x 3.400 x 1.040 = 28.288
4.000 x 4.600 x 1.040 = 19.136 +
75.712 x

Bekisting 2.400 mx 0.600 mx 2.000 = 2.880 x


NO URAIAN PEKERJAAN PERHITUNGAN VOLUM

8 Pondasi Type P5 beton 1.450 x 1.450 x 0.600 = 1.262 +


1.262 x
Tulangan
Dia 16 10.000 x 3.900 x 1.040 = 40.560
10.000 x 3.900 x 1.040 = 40.560
4.000 x 5.600 x 1.040 = 23.296 +
104.416 x

Bekisting 2.900 mx 0.600 mx 2.000 = 3.480 x

9 Kolom Pondasi Uk. 35 x 35 0.350 x 0.350 x 0.650 x 38.000 =

tulangan
8 D 16 8.000 x 1.600 x 1.570 kg= 20.096 x

dia.8-150 0.200 + 1.000 = 2.333 = 2.000 x


0.150

bekisting 4.000 mx 0.350 mx 0.650 x 38.000 =

Dikurangi = 15.000 x 0.200 x 0.300 x


= 113.000 x 0.250 x 0.450 x
= 30.000 x 0.200 x 0.100 x
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
10 Kolom Pondasi Uk. 35 x 75 0.350 x 0.750 x 0.650 x 1.000 =

tulangan
14 D 16 14.000 x 1.600 x 1.570 kg= 35.168 x

dia.8-150 0.200 + 1.000 = 2.333 = 2.000 x


0.150

bekisting 2.000 mx 1.100 mx 0.650 x 1.000 =

= 4.000 x 0.250 x 0.450 x

III PEKERJAAN STRUKTUR


A LANTAI I
Elevasi - 0,75
1 Sloof 25/55 2.650 x 1.000 = 2.650
1.150 x 2.000 = 2.300
1.650 x 2.000 = 3.300
8.250 x 0.250 x

3.000 x 1.000 = 3.000


1.500 x 2.000 = 3.000
2.000 x 2.000 = 4.000
10.000 M'

U 32 8 Dia 19 8.000 x 10.000 x 2.220 =

U 24 Dia 8 2.650 + 1.000 = 18.667 = 18.000 x


0.150
1.150 + 1.000 = 8.667 = 8.000 x
0.150
1.650 + 1.000 = 12.000 = 12.000 x
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
0.150

Bekisting 8.250 x 0.250 x 1.000 = 2.063


8.250 x 0.450 x 2.000 = 7.425 +
9.488 M2

2 Sloof 20/40 2.400 x 1.000 = 2.400


1.650 x 1.000 = 1.650
3.650 x 1.000 = 3.650
1.850 x 1.000 = 1.850
0.450 x 1.000 = 0.450
10.000 x 0.200 x

2.750 x 1.000 = 2.750


2.000 x 1.000 = 2.000
4.000 x 1.000 = 4.000
2.200 x 1.000 = 2.200
0.800 x 1.000 = 0.800
11.750 M'

U 32 5 Dia 16 5.000 x 11.750 x 1.570 =


NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
U 24 Dia 8 2.400 + 1.000 = 17.000 = 17.000 x
0.150
1.650 + 1.000 = 12.000 = 12.000 x
0.150
3.650 + 1.000 = 25.333 = 25.000 x
0.150
1.850 + 1.000 = 13.333 = 13.000 x
0.150
0.450 + 1.000 = 4.000 = 4.000 x
0.150

Bekisting 10.000 x 0.200 x 1.000 = 2.000


10.000 x 0.400 x 2.000 = 8.000 +
10.000 M2
ELEVASI + 0,00
1 Sloof 25/55 A' 5.650 x 1.000 = 5.650 6.000 x
7.650 x 1.000 = 7.650 8.000 x
A 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
B 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
C 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
C' 0.725 x 1.000 = 0.725 1.000 x
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
D 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
1 6.150 x 2.000 = 12.300 6.500 x
2.650 x 2.000 = 5.300 3.000 x
2 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.200 x 1.000 = 6.200 6.750 x
2.200 x 1.000 = 2.200 2.750 x
3 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
4 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
5 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
6 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
7 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
320.975

320.975 x 0.250 x 0.450 = 36.110 M3

U 32 8 Dia 19 8.000 x 342.000 x 2.220 =

U 24 Dia 8 5.650 + 1.000 = 38.667 = 38.000 x


0.150
7.650 + 1.000 = 52.000 = 52.000 x
0.150
0.725 + 1.000 = 5.833 = 5.000 x
0.150
6.150 + 1.000 = 42.000 = 42.000 x
0.150
6.650 + 1.000 = 45.333 = 45.000 x
0.150
4.650 + 1.000 = 32.000 = 32.000 x
0.150
0.725 + 1.000 = 5.833 = 5.000 x
0.150
5.650 + 1.000 = 38.667 = 38.000 x
0.150
2.650 + 1.000 = 18.667 = 18.000 x
0.150
6.200 + 1.000 = 42.333 = 42.000 x
0.150
2.200 + 1.000 = 15.667 = 15.000 x
0.150
6.575 + 1.000 = 44.833 = 44.000 x
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
0.150
2.575 + 1.000 = 18.167 = 18.000 x
0.150

Bekisting 320.975 x 0.250 x 1.000 = 80.244


320.975 x 0.450 x 2.000 = 288.878 +
369.121 M2

2 Sloof 20/45 6.250 x 12.000 = 75.000 6.500 x


2.750 x 12.000 = 33.000 3.000 x
0.775 x 2.000 = 1.550 1.000 x
3.025 x 8.000 = 24.200 3.250 x
2.775 x 4.000 = 11.100 3.000 x
3.275 x 8.000 = 26.200 3.500 x
2.275 x 4.000 = 9.100 2.500 x
180.150

180.150 x 0.200 x 0.350 = 12.611 M3

U 32 6 Dia 16 6.000 x 192.000 x 1.570 =


NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
U 24 Dia 8 6.250 + 1.000 = 42.667 = 42.000 x
0.150
2.750 + 1.000 = 19.333 = 19.000 x
0.150
0.775 + 1.000 = 6.167 = 6.000 x
0.150
3.025 + 1.000 = 21.167 = 21.000 x
0.150
2.775 + 1.000 = 19.500 = 19.000 x
0.150
3.275 + 1.000 = 22.833 = 22.000 x
0.150
2.275 + 1.000 = 16.167 = 16.000 x
0.150

Bekisting 180.150 x 0.200 x 1.000 = 36.030


180.150 x 0.350 x 2.000 = 126.105 +
162.135 M2

2 Sloof 20/40 22.000 x 1.000 = 22.000 22.000 x


2.700 x 4.000 = 10.800 3.000 x
2.750 x 2.000 = 5.500 3.000 x
3.025 x 1.000 = 3.025 3.250 x
1.775 x 1.000 = 1.775 2.000 x
43.100

43.100 x 0.200 x 0.300 = 2.586 M3

U 32 5 Dia 16 5.000 x 45.250 x 1.570 =

U 24 Dia 8 22.000 + 1.000 = 147.667 = 147.000 x


0.150
2.700 + 1.000 = 19.000 = 19.000 x
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
0.150
2.750 + 1.000 = 19.333 = 19.000 x
0.150
3.025 + 1.000 = 21.167 = 21.000 x
0.150
1.775 + 1.000 = 12.833 = 12.000 x
0.150
0.150

Bekisting 43.100 x 0.200 x 1.000 = 8.620


43.100 x 0.300 x 2.000 = 25.860 +
34.480 M2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
2 Sloof 15/30 2.275 x 1.000 = 2.275 2.500 x
0.600 x 1.000 = 0.600 0.800 x
4.275 x 1.000 = 4.275 4.500 x
0.720 x 2.000 = 1.440 0.920 x
8.590

8.590 x 0.150 x 0.200 = 0.258 M3

U 32 4 Dia 16 4.000 x 9.640 x 1.040 =

U 24 Dia 8 2.275 + 1.000 = 16.167 = 16.000 x


0.150
0.600 + 1.000 = 5.000 = 5.000 x
0.150
4.275 + 1.000 = 29.500 = 29.000 x
0.150
0.720 + 1.000 = 5.800 = 5.000 x
0.150

Bekisting 8.590 x 0.150 x 1.000 = 1.289


8.590 x 0.200 x 2.000 = 3.436 +
4.725 M2

T Kolong 1.325 x 1.000 = 1.325


6.150 x 3.000 = 18.450
2.825 x 1.000 = 2.825
1.650 x 1.000 = 1.650
6.650 x 3.000 = 19.950
4.650 x 2.000 = 9.300
6.650 x 1.000 = 6.650
2.150 x 1.000 = 2.150
6.150 x 1.000 = 6.150
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
2.650 x 1.000 = 2.650
5.650 x 1.000 = 5.650
0.825 x 1.000 = 0.825 +
77.575 x 0.100 x

3.000 x 4.000 = 12.000


12.000 x 0.100 x

WM 6 89.575 x 0.200 x 3.070 = 54.999

Bekisting 77.575 x 0.200 x 2.000 = 31.030


12.000 x 0.350 x 2.000 = 8.400 +
39.430 M2

Lantai 6.350 x 3.000 = 19.050


8.350 x 3.000 = 25.050
39.225 x 19.250 = 755.081 +
799.181 x 0.100 =

1,75 x M6 799.181 x 1.750 x 3.070 = 4,293.601 Kg

Bekisting 799.181 - 126.182 = 672.999

dikurangi Sloof 25/55 320.975 x 0.250 = 80.244


Sloof 20/45 180.150 x 0.200 = 36.030
Sloof 20/40 43.100 x 0.200 = 8.620
Sloof 15/30 8.590 x 0.150 = 1.289 +
126.182

Urugan Pasir = 799.181 x 0.650 = 519.468


Dikurangi = Err:509 -
Err:509 M3

Kolom Type K1 Uk. 35/35 49.000 x 3.900 x 0.350 x 0.350 =


NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
8 D 16 8.000 x 4.000 x 1.570 x 49.000 =

dia.8-150 3.450 + 1.000 = 24.000 = 24.000 x


0.150

bekisting 4.000 mx 0.350 mx 3.900 x 49.000 =

Dikurangi = 25.000 x 0.200 x 0.400 x


= 103.000 x 0.250 x 0.450 x
= 8.000 x 0.300 x 0.550 x

Kolom Type K2 Uk. 35/75 1.000 x 3.900 x 0.350 x 0.750 =

14 D 16 14.000 x 4.600 x 1.570 x 1.000 =

dia.8-150 3.450 + 1.000 = 24.000 = 24.000 x


0.150

bekisting 2.000 mx 1.100 mx 3.900 x 1.000 =

Dikurangi = 4.000 x 0.250 x 0.450 x

5 Kolom Praktis 9/9 cm 155.000 x 3.350 x 0.080 x 0.080 =

Dia 8 155.000 x 4.000 x 3.450 x 0.395

dia.8-150 3.350 + 1.000 = 23.333 = 23.000 x


0.150

bekisting 2.000 mx 0.090 mx 3.350 x 155.000 =

5 Balok 30/65 Elevasi + 4,00 1.650 x 2.000 = 3.300 2.000 x


NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
7.650 x 1.000 = 7.650 8.000 x
1.150 x 1.000 = 1.150 1.500 x
12.100 x 0.300 x

12.100 x 0.300 x 0.550 = 1.997 M3

8 D 19 8.000 x 13.500 x 2.220 x 1.000 =

U 24 Dia 8 1.650 + 1.000 = 12.000 = 12.000 x


0.150
7.650 + 1.000 = 52.000 = 52.000 x
0.150
1.150 + 1.000 = 8.667 = 8.000 x
0.150

Bekisting 12.100 x 0.300 x 1.000 = 3.630


12.100 x 0.550 x 2.000 = 13.310 +
16.940 M2

2 Balok 25/55 Elevasi + 4,00 A 5.650 x 1.000 = 5.650 6.000 x


6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
B 0.650 x 1.000 = 0.650 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
C 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
C' 0.725 x 1.000 = 0.725 1.000 x
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
D 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
1 2.150 x 1.000 = 2.150 2.500 x
2 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.200 x 1.000 = 6.200 6.750 x
2.200 x 1.000 = 2.200 2.750 x
3 6.650 x 1.000 = 6.650 7.000 x
2.150 x 1.000 = 2.150 2.500 x
6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
4 6.650 x 1.000 = 6.650 7.000 x
2.150 x 1.000 = 2.150 2.500 x
6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
5 6.650 x 1.000 = 6.650 7.000 x
2.150 x 1.000 = 2.150 2.500 x
6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6 6.650 x 1.000 = 6.650 7.000 x
2.150 x 1.000 = 2.150 2.500 x
6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
7 6.650 x 1.000 = 6.650 7.000 x
2.150 x 1.000 = 2.150 2.500 x
6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
277.375
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM

277.375 x 0.250 x 0.450 = 31.205 M3

U 32 8 Dia 19 8.000 x 297.500 x 2.220 =

U 24 Dia 8 277.375 + 1.000 = 1,850.167 = 1,850.000 x


0.150

Bekisting 277.375 x 0.250 x 1.000 = 69.344


277.375 x 0.450 x 2.000 = 249.638 +
318.981 M2

2 Balok Dak 25/55 Elevasi + 4,00 A' 1.350 x 1.000 = 1.350 1.650 x
5.650 x 1.000 = 5.650 6.000 x
2.650 x 1.000 = 2.650 3.000 x
3.650 x 1.000 = 3.650 4.000 x
1.150 x 1.000 = 1.150 1.500 x
A 2.475 x 1.000 = 2.475 2.650 x
6.150 x 2.000 = 12.300 6.500 x
29.225

29.225 x 0.250 x 0.450 = 3.288 M3

U 32 8 Dia 19 8.000 x 31.800 x 2.220 =

U 24 Dia 8 29.225 + 1.000 = 195.833 = 195.000 x


0.150

Bekisting 29.225 x 0.250 x 1.000 = 7.306


29.225 x 0.450 x 2.000 = 26.303 +
33.609 M2

2 Balok 20/45 6.250 x 7.000 = 43.750 6.500 x


6.750 x 5.000 = 33.750 7.000 x
2.750 x 7.000 = 19.250 3.000 x
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
2.250 x 5.000 = 11.250 2.500 x
3.025 x 4.000 = 12.100 3.250 x
2.775 x 2.000 = 5.550 3.000 x
1.775 x 1.000 = 1.775 2.000 x
1.575 x 1.000 = 1.575 1.800 x
2.975 x 1.000 = 2.975 3.200 x
131.975

131.975 x 0.200 x 0.350 = 9.238 M3

U 32 6 Dia 16 6.000 x 140.000 x 1.570 =

U 24 Dia 8 131.975 + 1.000 = 880.833 = 880.000 x


0.150

Bekisting 131.975 x 0.200 x 1.000 = 26.395


131.975 x 0.350 x 2.000 = 92.383 +
118.778 M2

2 Balok 20/40 18.750 x 1.000 = 18.750 19.000 x


0.825 x 1.000 = 0.825 1.100 x
1.375 x 1.000 = 1.375 1.650 x
1.650 x 1.000 = 1.650 2.000 x
3.650 x 1.000 = 3.650 4.000 x
1.900 x 1.000 = 1.900 2.250 x
0.450 x 1.000 = 0.450 0.800 x
2.775 x 1.000 = 2.775 3.000 x
31.375

31.375 x 0.200 x 0.300 = 1.883 M3

U 32 5 Dia 16 5.000 x 33.800 x 1.570 =


NO URAIAN PEKERJAAN PERHITUNGAN VOLUM

U 24 Dia 8 31.375 + 1.000 = 210.167 = 210.000 x


0.150

Bekisting 31.375 x 0.200 x 1.000 = 6.275


31.375 x 0.300 x 2.000 = 18.825 +
25.100 M2

2 Balok dak 20/40 7.850 x 1.000 = 7.850 7.850 x


0.400 x 3.000 = 1.200 0.650 x
0.475 x 1.000 = 0.475 0.650 x
3.650 x 3.000 = 10.950 4.000 x
3.700 x 1.000 = 3.700 4.000 x
2.700 x 6.000 = 16.200 3.000 x
2.675 x 1.000 = 2.675 3.000 x
2.650 x 1.000 = 2.650 3.000 x
2.725 x 1.000 = 2.725 3.000 x
2.750 x 2.000 = 5.500 3.000 x
53.925

53.925 x 0.200 x 0.300 = 3.236 M3

U 32 5 Dia 16 5.000 x 59.450 x 1.570 =

U 24 Dia 8 53.925 + 1.000 = 360.500 = 360.000 x


0.150

Bekisting 53.925 x 0.200 x 1.000 = 10.785


53.925 x 0.300 x 2.000 = 32.355 +
43.140 M2

Balok 15/40 10.850 x 1.000 = 10.850 10.850 x


NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
10.850

10.850 x 0.150 x 0.300 = 0.488 M3

U 32 4 Dia 13 4.000 x 10.850 x 1.040 =

U 24 Dia 8 10.850 + 1.000 = 73.333 = 73.000 x


0.150

Bekisting 10.850 x 0.150 x 1.000 = 1.628


10.850 x 0.300 x 2.000 = 6.510 +
8.138 M2

2 Balok 15/30 2.275 x 1.000 = 2.275 2.500 x


3.775 x 1.000 = 3.775 4.000 x
2.275 x 1.000 = 2.275 2.500 x
0.720 x 3.000 = 2.160 0.920 x
10.485

10.485 x 0.150 x 0.200 = 0.315 M3

U 32 4 Dia 16 4.000 x 11.760 x 1.040 =

U 24 Dia 8 2.275 + 1.000 = 16.167 = 16.000 x


0.150
3.775 + 1.000 = 26.167 = 26.000 x
0.150
0.720 + 1.000 = 5.800 = 5.000 x
0.150
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM

Bekisting 10.485 x 0.150 x 1.000 = 1.573


10.485 x 0.200 x 2.000 = 4.194 +
5.767 M2

Lantai 39.225 x 19.200 = 753.120


= 91.195 +
661.925 x 0.100 =

4.300 x 2.800 = 12.040


4.300 x 6.300 = 27.090
4.300 x 6.300 = 27.090
4.500 x 2.775 = 12.488
4.500 x 2.775 = 12.488
91.195 x

2 x M6 661.925 x 2.000 x 3.070 = 4,064.220 Kg

Bekisting 661.925 - Err:509 = Err:509 M2

dikurangi Err:509 x =
Err:509 Err:509 x 0.250 =
Err:509 Err:509 x 0.200 =
Err:509 Err:509 x 0.200 =
Err:509 x 0.150 =
Err:509 Err:509 x 0.150 =
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
Dak 10.850 x 4.150 = 45.028
30.425 x 3.000 = 91.275 +
136.303 x 0.100 =

2 x M6 136.303 x 1.750 x 3.070 = 732.285 Kg

Bekisting 136.303 - Err:509 = Err:509 M2

dikurangi 9.600 x 0.200 = 1.920


Err:509 x 0.300 = Err:509
Err:509 x 0.150 = Err:509
14.975 x 0.250 = 3.744
d Err:509

Kolom Type K1 Uk. 35/35 11.000 x 3.900 x 0.350 x 0.350 =


20.000 x 5.000 x 0.350 x 0.350 =

8 D 16 8.000 x 4.000 x 1.570 x 11.000 =


8.000 x 5.000 x 1.570 x 20.000 =

dia.8-150 3.450 + 1.000 = 24.000 = 24.000 x


0.150
4.450 + 1.000 = 30.667 = 30.000 x
0.150

bekisting 4.000 mx 0.350 mx 3.900 x 11.000 =


4.000 mx 0.350 mx 5.000 x 20.000 =

Dikurangi 25.000 = 19.000 x 0.200 x 0.400 x


103.000 = 78.000 x 0.250 x 0.450 x
8.000 = 6.000 x 0.300 x 0.550 x
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM

Kolom Type K2 Uk. 35/75 1.000 x 5.000 x 0.350 x 0.750 =

14 D 16 14.000 x 4.600 x 1.570 x 1.000 =

dia.8-150 4.450 + 1.000 = 30.667 = 30.000 x


0.150

bekisting 2.000 mx 1.100 mx 5.000 x 1.000 =

Dikurangi = 4.000 x 0.250 x 0.450 x

5 Kolom Praktis 9/9 cm 143.000 x 3.450 x 0.090 x 0.090 =

Dia 8 143.000 x 4.000 x 3.450 x 0.395

dia.8-150 3.450 + 1.000 = 24.000 = 24.000 x


0.150

bekisting 2.000 mx 0.090 mx 3.450 x 143.000 =


NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
2 Balok 25/55 Elevasi + 8,00 A 0.825 x 1.000 = 0.825 1.000 x
6.150 x 1.000 = 6.150 6.500 x
B 0.650 x 1.000 = 0.650 1.000 x
6.150 x 1.000 = 6.150 6.500 x
C 0.725 x 1.000 = 0.725 1.000 x
6.150 x 1.000 = 6.150 6.500 x
C' 0.725 x 1.000 = 0.725 1.000 x
0.725 x 1.000 = 0.725 1.000 x
6.150 x 1.000 = 6.150 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
D 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
1 6.150 x 2.000 = 12.300 6.500 x
2.650 x 1.000 = 2.650 3.000 x
2.650 x 1.000 = 2.650 3.000 x
2.200 x 1.000 = 2.200 2.750 x
2 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.200 x 1.000 = 6.200 6.750 x
2.200 x 1.000 = 2.200 2.750 x
117.850

117.850 x 0.250 x 0.450 = 13.258 M3

U 32 8 Dia 19 8.000 x 127.250 x 2.220 =

U 24 Dia 8 117.850 + 1.000 = 786.667 = 786.000 x


0.150
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM

Bekisting 117.850 x 0.250 x 1.000 = 29.463


117.850 x 0.450 x 2.000 = 106.065 +
135.528 M2

2 Balok 25/55 + Paraped 2.500 x 1.000 = 2.500 2.500 x


2.500

2.500 x 0.250 x 0.550 = 0.344


2.500 x 0.100 x 0.100 = 0.025 +
0.369

U 32 8 Dia 19 8.000 x 2.500 x 2.220 =

U 24 Dia 8 2.500 + 1.000 = 17.667 = 17.000 x


0.150

Wiremesh M6 = 2.500 x 0.150 x 3.070 =

Bekisting 2.500 x 0.250 x 1.000 = 0.625


2.500 x 0.650 x 2.000 = 3.250 +
3.875 M2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
2 Balok 20/45 19.000 x 1.000 = 19.000 19.000 x
3.275 x 2.000 = 6.550 3.500 x
2.750 x 2.000 = 5.500 3.000 x
2.650 x 5.000 = 13.250 3.000 x
44.300

44.300 x 0.200 x 0.350 = 3.101 M3

U 32 5 Dia 16 5.000 x 47.000 x 1.570 =

U 24 Dia 8 44.300 + 1.000 = 296.333 = 296.000 x


0.150

Bekisting 44.300 x 0.200 x 1.000 = 8.860


44.300 x 0.350 x 2.000 = 31.010 +
39.870 M2

2 Balok 20/45 + Paraped 2.300 x 1.000 = 2.300 2.500 x


2.650 x 4.000 = 10.600 3.000 x
6.250 x 2.000 = 12.500 6.500 x
25.400

25.400 x 0.200 x 0.450 = 2.286


25.400 x 0.100 x 0.100 = 0.254 +
2.540

U 32 5 Dia 16 5.000 x 27.500 x 1.570 =

U 24 Dia 8 25.400 + 1.000 = 170.333 = 170.000 x


0.150
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
Wiremesh M6 = 25.400 x 0.150 x 3.070 =

Bekisting 25.400 x 0.200 x 1.000 = 5.080


25.400 x 0.550 x 2.000 = 27.940 +
33.020 M2

Balok 15/40 2.750 x 5.000 = 13.750 3.000 x


13.750

13.750 x 0.150 x 0.300 = 0.619 M3

U 32 4 Dia 13 4.000 x 15.000 x 1.040 =

U 24 Dia 8 2.750 + 1.000 = 19.333 = 19.000 x


0.150

Bekisting 13.750 x 0.150 x 1.000 = 2.063


13.750 x 0.300 x 2.000 = 8.250 +
10.313 M2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
###Plat Lantai t = 10 cm 39.000 x 3.200 = 124.800
7.725 x 16.000 = 123.600
248.400 - 27.025 =

Dikurangi 2.300 x 6.250 = 14.375


2.300 x 2.750 = 6.325
2.300 x 2.750 = 6.325
27.025

Wiremesh M6
221.375 x 1.750 x 3.070 = 1,189.337 Kg

Bekisting 221.375 x 1.000 x 1.000 = 221.375


116.600 x 0.100 x 1.000 = 11.660 +
233.035 -

Dikurang Balok 25/55 117.850 x 0.250 =


Balok 20/55 + Paraped 2.500 x 0.250 =
Balok 20/45 44.300 x 0.200 =
Balok 20/45 + Paraped 25.400 x 0.200 =
Balok 15/40 13.750 x 0.150 =

5 Kolom Praktis 9/9 cm 9.000 x 3.450 x 0.090 x 0.090 =

Dia 8 9.000 x 4.000 x 3.450 x 0.395

dia.8-150 3.450 + 1.000 = 24.000 = 24.000 x


0.150

bekisting 2.000 mx 0.090 mx 3.450 x 9.000 =

Elevasi + 8,00 dan + 9,00


Ring Balok 25/55 6.450 x 1.000 = 6.450
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
1.950 x 1.000 = 1.950
6.150 x 1.000 = 6.150
5.650 x 1.000 = 5.650
6.150 x 2.000 = 12.300
4.650 x 1.000 = 4.650
37.150

37.150 x 0.250 x 0.550 = 5.108 M3

U 32 8 Dia 19 8.000 x 40.000 x 2.220 =

U 24 Dia 8 37.150 + 1.000 = 248.667 = 248.000 x


0.150

Bekisting 37.150 x 0.250 x 1.000 = 9.288


37.150 x 0.550 x 2.000 = 40.865 +
50.153 M2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
Ring Balok 20/45 6.150 x 7.000 = 43.050
5.650 x 2.000 = 11.300
6.650 x 6.000 = 39.900
4.650 x 3.000 = 13.950
2.150 x 1.000 = 2.150
110.350

110.350 x 0.200 x 0.450 = 9.932 M3

U 32 5 Dia 16 5.000 x 117.000 x 1.570 =

U 24 Dia 8 110.350 + 1.000 = 736.667 = 736.000 x


0.150

Bekisting 110.350 x 0.200 x 1.000 = 22.070


110.350 x 0.450 x 2.000 = 99.315 +
121.385 M2

Ring Balok 9/9 120.000 x 1.000 = 120.000


120.000

120.000 x 0.090 x 0.090 = 0.972 M3

U 32 4 Dia 8 4.000 x 39.000 x 0.395

U 24 Dia 8 120.000 + 1.000 = 801.000 = 801.000 x


0.150

Bekisting 120.000 x 0.090 x 2.000 = 21.600


21.600 M2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
Atap 33.800 + 15.500 x 10.500 x 2.000 =
2
0.500 x 15.500 x 10.500 x 2.000 =

Perabung 15.500 + 15.012 x 4.000 = 75.546 M'

Lisplank 98.600 M'


PERHITUNGAN VOLUME
PERHITUNGAN VOLUME

39.000 x 26.000 = 1,014.000 M2

41.000 + 28.000 = 69.000 x 2.000 = 138.000 M'

11.000 ttk x 1.000 = 11.000 x 3.000 = 33.000


165.000 ttk x 1.000 = 165.000 x 3.000 = 495.000
176.000 528.000 Btg

= 11.000 x 6.000 x 3.000 = 198.000


= 165.000 x 6.000 x 3.000 = 2,970.000
3,168.000 M'

176.000 Titk

1A P1 B P2 P3 P4 P6

1.000 4.000 2.00


1.000 1.000 5.000
1.000 1.000 5.000
1.000 1.000 5.000
2.00 5.000
11.000 4.000 2.000 9.000 7.000 17.000
11.000 4.000 4.000 27.000 28.000 102.000 176.000

11.000 ttk x 0.700 x 0.700 x 0.750 = 4.043


4.000 ttk x 0.700 x 0.700 x 0.750 = 1.470
2.000 ttk x 0.800 x 1.400 x 0.750 = 1.680
PERHITUNGAN VOLUME
9.000 ttk x 1.400 x 1.400 x 0.750 = 13.230
7.000 ttk x 1.400 x 1.400 x 0.750 = 10.290
17.000 ttk x 2.000 x 1.400 x 0.750 = 35.700 +
50.000 66.413 M3

11.000 ttk x 0.700 x 0.700 x 0.100 = 0.539


4.000 ttk x 0.700 x 0.700 x 0.100 = 0.196
2.000 ttk x 0.600 x 1.200 x 0.100 = 0.144
9.000 ttk x 1.200 x 1.200 x 0.100 = 1.296
7.000 ttk x 1.200 x 1.200 x 0.100 = 1.008
17.000 ttk x 1.800 x 1.200 x 0.100 = 3.672 +
6.316 M3

11.000 ttk x 0.500 x 0.500 x 0.050 = 0.138


4.000 ttk x 0.500 x 0.500 x 0.050 = 0.050
2.000 ttk x 0.600 x 1.200 x 0.050 = 0.072
9.000 ttk x 1.200 x 1.200 x 0.050 = 0.648
7.000 ttk x 1.200 x 1.200 x 0.050 = 0.504
17.000 ttk x 1.800 x 1.200 x 0.050 = 1.836 +
3.248 M3

0.600 x 0.600 x 0.600 = 0.216 x 15.000 = 3.240 M3

4.000 x 2.200 x 1.040 = 9.152


4.000 x 2.200 x 1.040 = 9.152
4.000 x 2.200 x 1.040 = 9.152 +
27.456 x 15.000 = 411.840 Kg

1.200 mx 0.600 mx 2.000 = 1.440 x 15.000 = 21.600 M2


PERHITUNGAN VOLUME
0.600 x 1.200 x 0.600 = 0.432 x 2.000 = 0.864 M3

8.000 x 2.200 x 1.040 = 18.304


4.000 x 3.400 x 1.040 = 14.144
4.000 x 3.400 x 1.040 = 14.144 +
46.592 x 2.000 = 93.184 Kg

1.800 mx 0.600 mx 2.000 = 2.160 x 2.000 = 4.320 M2

0.600 x 1.200 x 0.600 = 0.432


0.500 x 1.800 x 0.600 = 0.540 +
0.972 x 9.000 = 8.748 M3

2.000 x 2.300 x 1.040 = 4.784


4.000 x 3.400 x 1.040 = 14.144
2.000 x 2.900 x 1.040 = 6.032
4.000 x 3.400 x 1.040 = 14.144
1.000 x 2.300 x 1.040 = 2.392
1.000 x 2.600 x 1.040 = 2.704
1.000 x 2.900 x 1.040 = 3.016
1.000 x 2.900 x 1.040 = 3.016
4.000 x 3.150 x 1.040 = 13.104
63.336 x 9.000 = 570.024 Kg

1.800 mx 0.600 mx 2.000 = 2.160 x 9.000 = 19.440 M2

1.200 x 1.200 x 0.600 = 0.864 +


0.864 x 7.000 = 6.048 M3

8.000 x 3.400 x 1.040 = 28.288


8.000 x 3.400 x 1.040 = 28.288
4.000 x 4.600 x 1.040 = 19.136 +
75.712 x 7.000 = 529.984 Kg

2.400 mx 0.600 mx 2.000 = 2.880 x 7.000 = 20.160 M2


PERHITUNGAN VOLUME

1.450 x 1.450 x 0.600 = 1.262 +


1.262 x 17.000 = 21.446 M3

10.000 x 3.900 x 1.040 = 40.560


10.000 x 3.900 x 1.040 = 40.560
4.000 x 5.600 x 1.040 = 23.296 +
104.416 x 17.000 = 1,775.072 Kg

2.900 mx 0.600 mx 2.000 = 3.480 x 17.000 = 59.160 M2

0.350 x 0.350 x 0.650 x 38.000 = 3.026 M3

8.000 x 1.600 x 1.570 kg= 20.096 x 38.000 = 763.648 +


763.648 Kg

0.200 + 1.000 = 2.333 = 2.000 x 1.200 x 0.395 = 0.948 x


0.150

4.000 mx 0.350 mx 0.650 x 38.000 = 34.580 - 14.213 = 20.368 M2

= 15.000 x 0.200 x 0.300 x 1.000 = 0.900


= 113.000 x 0.250 x 0.450 x 1.000 = 12.713
= 30.000 x 0.200 x 0.100 x 1.000 = 0.600 +
14.213 M2
PERHITUNGAN VOLUME
0.350 x 0.750 x 0.650 x 1.000 = 0.171 M3

14.000 x 1.600 x 1.570 kg= 35.168 x 1.000 = 35.168 +


35.168 Kg

0.200 + 1.000 = 2.333 = 2.000 x 2.000 x 0.395 = 1.580 x


0.150

2.000 mx 1.100 mx 0.650 x 1.000 = 1.430 - 0.450 = 0.980 M2

= 4.000 x 0.250 x 0.450 x 1.000 = 0.450


0.450 M2

2.650 x 1.000 = 2.650


1.150 x 2.000 = 2.300
1.650 x 2.000 = 3.300
8.250 x 0.250 x 0.450 = 0.928
0.928 M3
3.000 x 1.000 = 3.000
1.500 x 2.000 = 3.000
2.000 x 2.000 = 4.000
10.000 M'

8.000 x 10.000 x 2.220 = 177.600 Kg

2.650 + 1.000 = 18.667 = 18.000 x 1.400 x 0.395 = 9.954 x


0.150
1.150 + 1.000 = 8.667 = 8.000 x 1.400 x 0.395 = 4.424 x
0.150
1.650 + 1.000 = 12.000 = 12.000 x 1.400 x 0.395 = 6.636 x
PERHITUNGAN VOLUME
0.150

8.250 x 0.250 x 1.000 = 2.063


8.250 x 0.450 x 2.000 = 7.425 +
9.488 M2

2.400 x 1.000 = 2.400


1.650 x 1.000 = 1.650
3.650 x 1.000 = 3.650
1.850 x 1.000 = 1.850
0.450 x 1.000 = 0.450
10.000 x 0.200 x 0.400 = 0.800 M3

2.750 x 1.000 = 2.750


2.000 x 1.000 = 2.000
4.000 x 1.000 = 4.000
2.200 x 1.000 = 2.200
0.800 x 1.000 = 0.800
11.750 M'

5.000 x 11.750 x 1.570 = 92.238 Kg x 1.000 = 92.238 +


92.238 Kg
PERHITUNGAN VOLUME
2.400 + 1.000 = 17.000 = 17.000 x 1.000 x 0.395 = 6.715 x
0.150
1.650 + 1.000 = 12.000 = 12.000 x 1.000 x 0.395 = 4.740 x
0.150
3.650 + 1.000 = 25.333 = 25.000 x 1.000 x 0.395 = 9.875 x
0.150
1.850 + 1.000 = 13.333 = 13.000 x 1.000 x 0.395 = 5.135 x
0.150
0.450 + 1.000 = 4.000 = 4.000 x 1.000 x 0.395 = 1.580 x
0.150

10.000 x 0.200 x 1.000 = 2.000


10.000 x 0.400 x 2.000 = 8.000 +
10.000 M2

5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000


7.650 x 1.000 = 7.650 8.000 x 1.000 = 8.000
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
PERHITUNGAN VOLUME
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
2.650 x 2.000 = 5.300 3.000 x 2.000 = 6.000
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.200 x 1.000 = 6.200 6.750 x 1.000 = 6.750
2.200 x 1.000 = 2.200 2.750 x 1.000 = 2.750
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.575 x 1.000 = 6.575 6.750 x 1.000 = 6.750
2.575 x 1.000 = 2.575 2.750 x 1.000 = 2.750
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.575 x 1.000 = 6.575 6.750 x 1.000 = 6.750
2.575 x 1.000 = 2.575 2.750 x 1.000 = 2.750
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.575 x 1.000 = 6.575 6.750 x 1.000 = 6.750
2.575 x 1.000 = 2.575 2.750 x 1.000 = 2.750
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.575 x 1.000 = 6.575 6.750 x 1.000 = 6.750
2.575 x 1.000 = 2.575 2.750 x 1.000 = 2.750
PERHITUNGAN VOLUME
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.575 x 1.000 = 6.575 6.750 x 1.000 = 6.750
2.575 x 1.000 = 2.575 2.750 x 1.000 = 2.750
320.975 342.000

320.975 x 0.250 x 0.450 = 36.110 M3

8.000 x 342.000 x 2.220 = 6,073.920 Kg

5.650 + 1.000 = 38.667 = 38.000 x 1.400 x 0.395 = 21.014 x


0.150
7.650 + 1.000 = 52.000 = 52.000 x 1.400 x 0.395 = 28.756 x
0.150
0.725 + 1.000 = 5.833 = 5.000 x 1.400 x 0.395 = 2.765 x
0.150
6.150 + 1.000 = 42.000 = 42.000 x 1.400 x 0.395 = 23.226 x
0.150
6.650 + 1.000 = 45.333 = 45.000 x 1.400 x 0.395 = 24.885 x
0.150
4.650 + 1.000 = 32.000 = 32.000 x 1.400 x 0.395 = 17.696 x
0.150
0.725 + 1.000 = 5.833 = 5.000 x 1.400 x 0.395 = 2.765 x
0.150
5.650 + 1.000 = 38.667 = 38.000 x 1.400 x 0.395 = 21.014 x
0.150
2.650 + 1.000 = 18.667 = 18.000 x 1.400 x 0.395 = 9.954 x
0.150
6.200 + 1.000 = 42.333 = 42.000 x 1.400 x 0.395 = 23.226 x
0.150
2.200 + 1.000 = 15.667 = 15.000 x 1.400 x 0.395 = 8.295 x
0.150
6.575 + 1.000 = 44.833 = 44.000 x 1.400 x 0.395 = 24.332 x
PERHITUNGAN VOLUME
0.150
2.575 + 1.000 = 18.167 = 18.000 x 1.400 x 0.395 = 9.954 x
0.150

320.975 x 0.250 x 1.000 = 80.244


320.975 x 0.450 x 2.000 = 288.878 +
369.121 M2

6.250 x 12.000 = 75.000 6.500 x 12.000 = 78.000


2.750 x 12.000 = 33.000 3.000 x 12.000 = 36.000
0.775 x 2.000 = 1.550 1.000 x 2.000 = 2.000
3.025 x 8.000 = 24.200 3.250 x 8.000 = 26.000
2.775 x 4.000 = 11.100 3.000 x 4.000 = 12.000
3.275 x 8.000 = 26.200 3.500 x 8.000 = 28.000
2.275 x 4.000 = 9.100 2.500 x 4.000 = 10.000
180.150 192.000

180.150 x 0.200 x 0.350 = 12.611 M3

6.000 x 192.000 x 1.570 = 1,808.640 Kg


PERHITUNGAN VOLUME
6.250 + 1.000 = 42.667 = 42.000 x 1.100 x 0.395 = 18.249 x
0.150
2.750 + 1.000 = 19.333 = 19.000 x 1.100 x 0.395 = 8.256 x
0.150
0.775 + 1.000 = 6.167 = 6.000 x 1.100 x 0.395 = 2.607 x
0.150
3.025 + 1.000 = 21.167 = 21.000 x 1.100 x 0.395 = 9.125 x
0.150
2.775 + 1.000 = 19.500 = 19.000 x 1.100 x 0.395 = 8.256 x
0.150
3.275 + 1.000 = 22.833 = 22.000 x 1.100 x 0.395 = 9.559 x
0.150
2.275 + 1.000 = 16.167 = 16.000 x 1.100 x 0.395 = 6.952 x
0.150

180.150 x 0.200 x 1.000 = 36.030


180.150 x 0.350 x 2.000 = 126.105 +
162.135 M2

22.000 x 1.000 = 22.000 22.000 x 1.000 = 22.000


2.700 x 4.000 = 10.800 3.000 x 4.000 = 12.000
2.750 x 2.000 = 5.500 3.000 x 2.000 = 6.000
3.025 x 1.000 = 3.025 3.250 x 1.000 = 3.250
1.775 x 1.000 = 1.775 2.000 x 1.000 = 2.000
43.100 45.250

43.100 x 0.200 x 0.300 = 2.586 M3

5.000 x 45.250 x 1.570 = 355.213 Kg

22.000 + 1.000 = 147.667 = 147.000 x 1.000 x 0.395 = 58.065 x


0.150
2.700 + 1.000 = 19.000 = 19.000 x 1.000 x 0.395 = 7.505 x
PERHITUNGAN VOLUME
0.150
2.750 + 1.000 = 19.333 = 19.000 x 1.000 x 0.395 = 7.505 x
0.150
3.025 + 1.000 = 21.167 = 21.000 x 1.000 x 0.395 = 8.295 x
0.150
1.775 + 1.000 = 12.833 = 12.000 x 1.000 x 0.395 = 4.740 x
0.150
0.150

43.100 x 0.200 x 1.000 = 8.620


43.100 x 0.300 x 2.000 = 25.860 +
34.480 M2
PERHITUNGAN VOLUME
2.275 x 1.000 = 2.275 2.500 x 1.000 = 2.500
0.600 x 1.000 = 0.600 0.800 x 1.000 = 0.800
4.275 x 1.000 = 4.275 4.500 x 1.000 = 4.500
0.720 x 2.000 = 1.440 0.920 x 2.000 = 1.840
8.590 9.640

8.590 x 0.150 x 0.200 = 0.258 M3

4.000 x 9.640 x 1.040 = 40.102 Kg

2.275 + 1.000 = 16.167 = 16.000 x 0.700 x 0.395 = 4.424 x


0.150
0.600 + 1.000 = 5.000 = 5.000 x 0.700 x 0.395 = 1.383 x
0.150
4.275 + 1.000 = 29.500 = 29.000 x 0.700 x 0.395 = 8.019 x
0.150
0.720 + 1.000 = 5.800 = 5.000 x 0.700 x 0.395 = 1.383 x
0.150

8.590 x 0.150 x 1.000 = 1.289


8.590 x 0.200 x 2.000 = 3.436 +
4.725 M2

1.325 x 1.000 = 1.325


6.150 x 3.000 = 18.450
2.825 x 1.000 = 2.825
1.650 x 1.000 = 1.650
6.650 x 3.000 = 19.950
4.650 x 2.000 = 9.300
6.650 x 1.000 = 6.650
2.150 x 1.000 = 2.150
6.150 x 1.000 = 6.150
PERHITUNGAN VOLUME
2.650 x 1.000 = 2.650
5.650 x 1.000 = 5.650
0.825 x 1.000 = 0.825 +
77.575 x 0.100 x 0.200 = 1.552

3.000 x 4.000 = 12.000


12.000 x 0.100 x 0.350 = 0.420 +
1.972 M3
89.575 x 0.200 x 3.070 = 54.999

77.575 x 0.200 x 2.000 = 31.030


12.000 x 0.350 x 2.000 = 8.400 +
39.430 M2

6.350 x 3.000 = 19.050


8.350 x 3.000 = 25.050
39.225 x 19.250 = 755.081 +
799.181 x 0.100 = 79.918 M3

799.181 x 1.750 x 3.070 = 4,293.601 Kg

799.181 - 126.182 = 672.999

25/55 320.975 x 0.250 = 80.244


20/45 180.150 x 0.200 = 36.030
20/40 43.100 x 0.200 = 8.620
15/30 8.590 x 0.150 = 1.289 +
126.182

= 799.181 x 0.650 = 519.468


= Err:509 -
Err:509 M3

49.000 x 3.900 x 0.350 x 0.350 = 23.410


PERHITUNGAN VOLUME
8.000 x 4.000 x 1.570 x 49.000 = 2,461.760 Kg

3.450 + 1.000 = 24.000 = 24.000 x 1.200 x 0.395 = 11.376 x


0.150

4.000 mx 0.350 mx 3.900 x 49.000 = 267.540 - 16.908 = 250.633 M2

= 25.000 x 0.200 x 0.400 x 2.000 = 4.000


= 103.000 x 0.250 x 0.450 x 1.000 = 11.588
= 8.000 x 0.300 x 0.550 x 1.000 = 1.320 +
16.908 M2

1.000 x 3.900 x 0.350 x 0.750 = 1.024

14.000 x 4.600 x 1.570 x 1.000 = 101.108 Kg

3.450 + 1.000 = 24.000 = 24.000 x 2.000 x 0.395 = 18.960 x


0.150

2.000 mx 1.100 mx 3.900 x 1.000 = 8.580 - 0.450 = 8.130 M2

= 4.000 x 0.250 x 0.450 x 1.000 = 0.450


0.450 M2

155.000 x 3.350 x 0.080 x 0.080 = 3.323 M3

155.000 x 4.000 x 3.450 x 0.395

3.350 + 1.000 = 23.333 = 23.000 x 0.200 x 0.395 = 1.817 x 1


0.150

2.000 mx 0.090 mx 3.350 x 155.000 = 93.465 M2


13.500
1.650 x 2.000 = 3.300 2.000 x 2.000 = 4.000
PERHITUNGAN VOLUME
7.650 x 1.000 = 7.650 8.000 x 1.000 = 8.000
1.150 x 1.000 = 1.150 1.500 x 1.000 = 1.500
12.100 x 0.300 x 0.550 = 1.997 M3

12.100 x 0.300 x 0.550 = 1.997 M3

8.000 x 13.500 x 2.220 x 1.000 = 239.760 Kg

1.650 + 1.000 = 12.000 = 12.000 x 1.700 x 0.395 = 8.058 x


0.150
7.650 + 1.000 = 52.000 = 52.000 x 1.700 x 0.395 = 34.918 x
0.150
1.150 + 1.000 = 8.667 = 8.000 x 1.700 x 0.395 = 5.372 x
0.150

12.100 x 0.300 x 1.000 = 3.630


12.100 x 0.550 x 2.000 = 13.310 +
16.940 M2
#REF!
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000 1.00
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
0.650 x 1.000 = 0.650 1.000 x 1.000 = 1.000
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000 1.00
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000 1.00
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
PERHITUNGAN VOLUME
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000 1.00
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000 1.00
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
2.150 x 1.000 = 2.150 2.500 x 1.000 = 2.500
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.200 x 1.000 = 6.200 6.750 x 1.000 = 6.750
2.200 x 1.000 = 2.200 2.750 x 1.000 = 2.750
6.650 x 1.000 = 6.650 7.000 x 1.000 = 7.000
2.150 x 1.000 = 2.150 2.500 x 1.000 = 2.500
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.650 x 1.000 = 6.650 7.000 x 1.000 = 7.000
2.150 x 1.000 = 2.150 2.500 x 1.000 = 2.500
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.650 x 1.000 = 6.650 7.000 x 1.000 = 7.000
2.150 x 1.000 = 2.150 2.500 x 1.000 = 2.500
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.650 x 1.000 = 6.650 7.000 x 1.000 = 7.000
2.150 x 1.000 = 2.150 2.500 x 1.000 = 2.500
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.650 x 1.000 = 6.650 7.000 x 1.000 = 7.000
2.150 x 1.000 = 2.150 2.500 x 1.000 = 2.500
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
277.375 297.500
PERHITUNGAN VOLUME

277.375 x 0.250 x 0.450 = 31.205 M3

8.000 x 297.500 x 2.220 = 5,283.600 Kg

277.375 + 1.000 = 1,850.167 = 1,850.000 x 1.400 x 0.395 = 1,023.050 Kg


0.150

277.375 x 0.250 x 1.000 = 69.344


277.375 x 0.450 x 2.000 = 249.638 +
318.981 M2

1.350 x 1.000 = 1.350 1.650 x 1.000 = 1.650


5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000 1.00
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
3.650 x 1.000 = 3.650 4.000 x 1.000 = 4.000
1.150 x 1.000 = 1.150 1.500 x 1.000 = 1.500
2.475 x 1.000 = 2.475 2.650 x 1.000 = 2.650
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
29.225 31.800

29.225 x 0.250 x 0.450 = 3.288 M3

8.000 x 31.800 x 2.220 = 564.768 Kg

29.225 + 1.000 = 195.833 = 195.000 x 1.400 x 0.395 = 107.835 Kg


0.150

29.225 x 0.250 x 1.000 = 7.306


29.225 x 0.450 x 2.000 = 26.303 +
33.609 M2

6.250 x 7.000 = 43.750 6.500 x 7.000 = 45.500


6.750 x 5.000 = 33.750 7.000 x 5.000 = 35.000
2.750 x 7.000 = 19.250 3.000 x 7.000 = 21.000
PERHITUNGAN VOLUME
2.250 x 5.000 = 11.250 2.500 x 5.000 = 12.500
3.025 x 4.000 = 12.100 3.250 x 4.000 = 13.000
2.775 x 2.000 = 5.550 3.000 x 2.000 = 6.000
1.775 x 1.000 = 1.775 2.000 x 1.000 = 2.000
1.575 x 1.000 = 1.575 1.800 x 1.000 = 1.800
2.975 x 1.000 = 2.975 3.200 x 1.000 = 3.200
131.975 140.000

131.975 x 0.200 x 0.350 = 9.238 M3

6.000 x 140.000 x 1.570 = 1,318.800 Kg

131.975 + 1.000 = 880.833 = 880.000 x 1.100 x 0.395 = 382.360


0.150

131.975 x 0.200 x 1.000 = 26.395


131.975 x 0.350 x 2.000 = 92.383 +
118.778 M2

18.750 x 1.000 = 18.750 19.000 x 1.000 = 19.000


0.825 x 1.000 = 0.825 1.100 x 1.000 = 1.100
1.375 x 1.000 = 1.375 1.650 x 1.000 = 1.650
1.650 x 1.000 = 1.650 2.000 x 1.000 = 2.000
3.650 x 1.000 = 3.650 4.000 x 1.000 = 4.000
1.900 x 1.000 = 1.900 2.250 x 1.000 = 2.250
0.450 x 1.000 = 0.450 0.800 x 1.000 = 0.800
2.775 x 1.000 = 2.775 3.000 x 1.000 = 3.000
31.375 33.800

31.375 x 0.200 x 0.300 = 1.883 M3

5.000 x 33.800 x 1.570 = 265.330 Kg


PERHITUNGAN VOLUME

31.375 + 1.000 = 210.167 = 210.000 x 1.000 x 0.395 = 82.950 x


0.150

31.375 x 0.200 x 1.000 = 6.275


31.375 x 0.300 x 2.000 = 18.825 +
25.100 M2

7.850 x 1.000 = 7.850 7.850 x 1.000 = 7.850


0.400 x 3.000 = 1.200 0.650 x 3.000 = 1.950
0.475 x 1.000 = 0.475 0.650 x 1.000 = 0.650
3.650 x 3.000 = 10.950 4.000 x 3.000 = 12.000
3.700 x 1.000 = 3.700 4.000 x 1.000 = 4.000
2.700 x 6.000 = 16.200 3.000 x 6.000 = 18.000
2.675 x 1.000 = 2.675 3.000 x 1.000 = 3.000
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
2.725 x 1.000 = 2.725 3.000 x 1.000 = 3.000
2.750 x 2.000 = 5.500 3.000 x 2.000 = 6.000
53.925 59.450

53.925 x 0.200 x 0.300 = 3.236 M3

5.000 x 59.450 x 1.570 = 466.683 Kg

53.925 + 1.000 = 360.500 = 360.000 x 1.000 x 0.395 = 142.200


0.150

53.925 x 0.200 x 1.000 = 10.785


53.925 x 0.300 x 2.000 = 32.355 +
43.140 M2

10.850 x 1.000 = 10.850 10.850 x 1.000 = 10.850


PERHITUNGAN VOLUME
10.850 10.850

10.850 x 0.150 x 0.300 = 0.488 M3

4.000 x 10.850 x 1.040 = 45.136 Kg

10.850 + 1.000 = 73.333 = 73.000 x 0.900 x 0.395 = 25.952 x


0.150

10.850 x 0.150 x 1.000 = 1.628


10.850 x 0.300 x 2.000 = 6.510 +
8.138 M2

2.275 x 1.000 = 2.275 2.500 x 1.000 = 2.500


3.775 x 1.000 = 3.775 4.000 x 1.000 = 4.000
2.275 x 1.000 = 2.275 2.500 x 1.000 = 2.500
0.720 x 3.000 = 2.160 0.920 x 3.000 = 2.760
10.485 11.760

10.485 x 0.150 x 0.200 = 0.315 M3

4.000 x 11.760 x 1.040 = 48.922 Kg

2.275 + 1.000 = 16.167 = 16.000 x 0.700 x 0.395 = 4.424 x


0.150
3.775 + 1.000 = 26.167 = 26.000 x 0.700 x 0.395 = 7.189 x
0.150
0.720 + 1.000 = 5.800 = 5.000 x 0.700 x 0.395 = 1.383 x
0.150
PERHITUNGAN VOLUME

10.485 x 0.150 x 1.000 = 1.573


10.485 x 0.200 x 2.000 = 4.194 +
5.767 M2

39.225 x 19.200 = 753.120


= 91.195 +
661.925 x 0.100 = 66.193 M3

4.300 x 2.800 = 12.040


4.300 x 6.300 = 27.090
4.300 x 6.300 = 27.090
4.500 x 2.775 = 12.488
4.500 x 2.775 = 12.488
91.195 x

661.925 x 2.000 x 3.070 = 4,064.220 Kg

661.925 - Err:509 = Err:509 M2

x = -
Err:509 x 0.250 = Err:509
Err:509 x 0.200 = Err:509
Err:509 x 0.200 = Err:509
x 0.150 = Err:509
Err:509 x 0.150 = Err:509 +
Err:509 M2
PERHITUNGAN VOLUME
10.850 x 4.150 = 45.028
30.425 x 3.000 = 91.275 +
136.303 x 0.100 = 13.630 M3

136.303 x 1.750 x 3.070 = 732.285 Kg

136.303 - Err:509 = Err:509 M2

9.600 x 0.200 = 1.920


r:509 x 0.300 = Err:509
r:509 x 0.150 = Err:509
14.975 x 0.250 = 3.744
d Err:509

11.000 x 3.900 x 0.350 x 0.350 = 5.255


20.000 x 5.000 x 0.350 x 0.350 = 12.250 +
17.505

8.000 x 4.000 x 1.570 x 11.000 = 552.640


8.000 x 5.000 x 1.570 x 20.000 = 1,256.000 +
1,808.640 Kg

3.450 + 1.000 = 24.000 = 24.000 x 1.200 x 0.395 = 11.376 x


0.150
4.450 + 1.000 = 30.667 = 30.000 x 1.200 x 0.395 = 14.220 x
0.150

4.000 mx 0.350 mx 3.900 x 11.000 = 60.060


4.000 mx 0.350 mx 5.000 x 20.000 = 140.000
200.060 - 12.805 = 187.255 M2

25.000 = 19.000 x 0.200 x 0.400 x 2.000 = 3.040


103.000 = 78.000 x 0.250 x 0.450 x 1.000 = 8.775
8.000 = 6.000 x 0.300 x 0.550 x 1.000 = 0.990 +
12.805 M2
PERHITUNGAN VOLUME

1.000 x 5.000 x 0.350 x 0.750 = 1.313

14.000 x 4.600 x 1.570 x 1.000 = 101.108 Kg

4.450 + 1.000 = 30.667 = 30.000 x 2.000 x 0.395 = 23.700


0.150

2.000 mx 1.100 mx 5.000 x 1.000 = 11.000 - 0.450 = 10.550 M2

= 4.000 x 0.250 x 0.450 x 1.000 = 0.450


0.450 M2

143.000 x 3.450 x 0.090 x 0.090 = 3.996 M3

143.000 x 4.000 x 3.450 x 0.395

3.450 + 1.000 = 24.000 = 24.000 x 0.200 x 0.395 = 1.896 x 1


0.150

2.000 mx 0.090 mx 3.450 x 143.000 = 88.803 M2


PERHITUNGAN VOLUME
0.825 x 1.000 = 0.825 1.000 x 1.000 = 1.000
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
0.650 x 1.000 = 0.650 1.000 x 1.000 = 1.000
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000 1.00
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
0.725 x 1.000 = 0.725 1.000 x 1.000 = 1.000
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000 1.00
6.650 x 2.000 = 13.300 7.000 x 2.000 = 14.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
2.200 x 1.000 = 2.200 2.750 x 1.000 = 2.750
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
2.650 x 1.000 = 2.650 3.000 x 1.000 = 3.000
6.200 x 1.000 = 6.200 6.750 x 1.000 = 6.750
2.200 x 1.000 = 2.200 2.750 x 1.000 = 2.750
117.850 127.250

117.850 x 0.250 x 0.450 = 13.258 M3

8.000 x 127.250 x 2.220 = 2,259.960 Kg

117.850 + 1.000 = 786.667 = 786.000 x 1.400 x 0.395 = 434.658


0.150
PERHITUNGAN VOLUME

117.850 x 0.250 x 1.000 = 29.463


117.850 x 0.450 x 2.000 = 106.065 +
135.528 M2

2.500 x 1.000 = 2.500 2.500 x 1.000 = 2.500


2.500 2.500

2.500 x 0.250 x 0.550 = 0.344


2.500 x 0.100 x 0.100 = 0.025 +
0.369

8.000 x 2.500 x 2.220 = 44.400 Kg

2.500 + 1.000 = 17.667 = 17.000 x 1.400 x 0.395 = 9.401 x


0.150

= 2.500 x 0.150 x 3.070 = 1.151 Kg

2.500 x 0.250 x 1.000 = 0.625


2.500 x 0.650 x 2.000 = 3.250 +
3.875 M2
PERHITUNGAN VOLUME
19.000 x 1.000 = 19.000 19.000 x 1.000 = 19.000
3.275 x 2.000 = 6.550 3.500 x 2.000 = 7.000
2.750 x 2.000 = 5.500 3.000 x 2.000 = 6.000
2.650 x 5.000 = 13.250 3.000 x 5.000 = 15.000
44.300 47.000

44.300 x 0.200 x 0.350 = 3.101 M3

5.000 x 47.000 x 1.570 = 368.950 Kg

44.300 + 1.000 = 296.333 = 296.000 x 1.100 x 0.395 = 128.612 x


0.150

44.300 x 0.200 x 1.000 = 8.860


44.300 x 0.350 x 2.000 = 31.010 +
39.870 M2

2.300 x 1.000 = 2.300 2.500 x 1.000 = 2.500


2.650 x 4.000 = 10.600 3.000 x 4.000 = 12.000
6.250 x 2.000 = 12.500 6.500 x 2.000 = 13.000
25.400 27.500

25.400 x 0.200 x 0.450 = 2.286


25.400 x 0.100 x 0.100 = 0.254 +
2.540

5.000 x 27.500 x 1.570 = 215.875 Kg

25.400 + 1.000 = 170.333 = 170.000 x 1.100 x 0.395 = 73.865 x


0.150
PERHITUNGAN VOLUME
= 25.400 x 0.150 x 3.070 = 11.697 Kg

25.400 x 0.200 x 1.000 = 5.080


25.400 x 0.550 x 2.000 = 27.940 +
33.020 M2

2.750 x 5.000 = 13.750 3.000 x 5.000 = 15.000


13.750 15.000

13.750 x 0.150 x 0.300 = 0.619 M3

4.000 x 15.000 x 1.040 = 62.400 Kg

2.750 + 1.000 = 19.333 = 19.000 x 0.900 x 0.395 = 6.755 x


0.150

13.750 x 0.150 x 1.000 = 2.063


13.750 x 0.300 x 2.000 = 8.250 +
10.313 M2
PERHITUNGAN VOLUME
39.000 x 3.200 = 124.800
7.725 x 16.000 = 123.600
248.400 - 27.025 = 221.375 x 0.100 = 22.138 M3

2.300 x 6.250 = 14.375


2.300 x 2.750 = 6.325
2.300 x 2.750 = 6.325
27.025

221.375 x 1.750 x 3.070 = 1,189.337 Kg

221.375 x 1.000 x 1.000 = 221.375


116.600 x 0.100 x 1.000 = 11.660 +
233.035 - 46.090 = 186.945 M2

5/55 117.850 x 0.250 = 29.463


0/55 + Paraped 2.500 x 0.250 = 0.625
0/45 44.300 x 0.200 = 8.860
0/45 + Paraped 25.400 x 0.200 = 5.080
5/40 13.750 x 0.150 = 2.063 +
46.090 M2

9.000 x 3.450 x 0.090 x 0.090 = 0.252 M3

9.000 x 4.000 x 3.450 x 0.395

3.450 + 1.000 = 24.000 = 24.000 x 0.200 x 0.395 = 1.896 x


0.150

2.000 mx 0.090 mx 3.450 x 9.000 = 5.589 M2

6.450 x 1.000 = 6.450 7.000 x 1.000 = 7.000


PERHITUNGAN VOLUME
1.950 x 1.000 = 1.950 2.500 x 1.000 = 2.500
6.150 x 1.000 = 6.150 6.500 x 1.000 = 6.500
5.650 x 1.000 = 5.650 6.000 x 1.000 = 6.000
6.150 x 2.000 = 12.300 6.500 x 2.000 = 13.000
4.650 x 1.000 = 4.650 5.000 x 1.000 = 5.000
37.150 40.000

37.150 x 0.250 x 0.550 = 5.108 M3

8.000 x 40.000 x 2.220 = 710.400 Kg

37.150 + 1.000 = 248.667 = 248.000 x 1.400 x 0.395 = 137.144


0.150

37.150 x 0.250 x 1.000 = 9.288


37.150 x 0.550 x 2.000 = 40.865 +
50.153 M2
PERHITUNGAN VOLUME
6.150 x 7.000 = 43.050 6.500 x 7.000 = 45.500
5.650 x 2.000 = 11.300 6.000 x 2.000 = 12.000
6.650 x 6.000 = 39.900 7.000 x 6.000 = 42.000
4.650 x 3.000 = 13.950 5.000 x 3.000 = 15.000
2.150 x 1.000 = 2.150 2.500 x 1.000 = 2.500
110.350 117.000

110.350 x 0.200 x 0.450 = 9.932 M3

5.000 x 117.000 x 1.570 = 918.450 Kg

110.350 + 1.000 = 736.667 = 736.000 x 1.100 x 0.395 = 319.792


0.150

110.350 x 0.200 x 1.000 = 22.070


110.350 x 0.450 x 2.000 = 99.315 +
121.385 M2

120.000 x 1.000 = 120.000 6.500 x 6.000 = 39.000


120.000 39.000

120.000 x 0.090 x 0.090 = 0.972 M3

4.000 x 39.000 x 0.395 = 61.620

120.000 + 1.000 = 801.000 = 801.000 x 0.420 x 0.395 = 132.886 +


0.150 194.506

120.000 x 0.090 x 2.000 = 21.600


21.600 M2
PERHITUNGAN VOLUME
33.800 + 15.500 x 10.500 x 2.000 = 517.650
2
0.500 x 15.500 x 10.500 x 2.000 = 162.750 +
680.400 M2

15.500 + 15.012 x 4.000 = 75.546 M'

98.600 M'
PERHITUNGAN VOLUME
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
I Tangga I
1 Galian Tanah 6.000 x 0.600 x 0.500 = 1.800 M3

2 Urugan Pasir t = 10 cm 6.000 x 0.600 x 0.100 = 0.360 M3

3 Cerucuk Dia 8 - 200 6.000 = 15.000 = 15.000 x


0.400

4 Pondasi beton 0.500 x 0.120 x 6.000 = 0.360


0.280 x 0.225 x 6.000 = 0.378 +
0.738 M3
Tulangan
dia.12-150 6.000 = 40.000 = 40.000 x
0.150
0.500 = 3.333 = 3.000 x
0.150

Bekisting 6.000 mx 0.400 mx 2.000 = 4.800 M2

8 Tangga beton 6.000 x 1.100 x 0.120


0.500 x 0.150 x 0.300 x 6.000 x

Tulangan
Dia 16 6.000 = 40.000 = 40.000 x
0.150
6.000 = 40.000 = 40.000 x
0.150
14.000 x

M6 0.600 x 6.000 x 3.070 = 11.052 Kg


Bekisting 6.000 mx 1.100 mx 1.000 = 6.600
0.150 mx 6.000 mx 4.000 = 3.600 +
10.200 M2

I Tangga 2
1 Galian Tanah 8.000 x 0.600 x 0.500 = 2.400 M3

2 Urugan Pasir t = 10 cm 8.000 x 0.600 x 0.100 = 0.480 M3

3 Cerucuk Dia 8 - 200 8.000 = 20.000 = 20.000 x


0.400

4 Pondasi beton 0.500 x 0.120 x 8.000 = 0.480


0.280 x 0.225 x 8.000 = 0.504 +
0.984 M3
Tulangan
dia.12-150 8.000 = 53.333 = 53.000 x
0.150
0.500 = 3.333 = 3.000 x
0.150

Bekisting 8.000 mx 0.400 mx 2.000 = 6.400 M2

8 Tangga beton 8.000 x 1.100 x 0.120


0.500 x 0.150 x 0.300 x 8.000 x

Tulangan
Dia 16 8.000 = 53.333 = 53.000 x
0.150
8.000 = 53.333 = 53.000 x
0.150
14.000 x
M6 0.600 x 8.000 x 3.070 = 14.736 Kg

Bekisting 8.000 mx 1.100 mx 1.000 = 8.800


0.150 mx 8.000 mx 4.000 = 4.800 +
13.600 M2
Tangga 3

1 Balok Tangga 15/30 2.725 x 1.000 = 2.725 +


2.725 x 0.150 x

3.000 x 1.000 = 3.000 +


3.000 M'

U 32 4 Dia 13 4.000 x 3.000 x 1.040 =

U 24 Dia 8 2.725 + 1.000 = 19.167 = 19.000 x


0.150

Bekisting 2.725 x 0.150 x 1.000 = 0.409


2.725 x 0.300 x 2.000 = 1.635 +
2.044 M2

Kolom Type KT Uk. 20/20 1.000 x 2.000 x 0.200 x 0.200 =

4 D 16 4.000 x 2.000 x 1.570 x 1.000 =

dia.8-150 1.600 + 1.000 = 11.667 = 11.000 x


0.150

bekisting 4.000 mx 0.200 mx 2.000 x 1.000 =

Dikurangi = 0.150 x 0.300 x 1.000 x

Plat Tangga beton 3.850 x 1.500 x 0.120


3.000 x 1.000 x 0.120
0.500 x 0.154 x 0.300 x 1.500 x

Tulangan
Dia 16 3.850 = 19.250 = 19.000 x 1.500 x
0.200
1.500 = 10.000 = 10.000 x 3.850 x
0.150
3.000 = 20.000 = 20.000 x 1.000 x
0.150
1.000 = 6.667 = 6.000 x 3.000 x
0.150

M6 0.550 x 1.500 x 3.070 = 2.533 x

Bekisting 3.850 mx 1.500 mx 1.000 = 5.775


0.150 mx 1.500 mx 25.000 = 5.625 +
11.400 M2

I Ram 1
1 Galian Tanah 9.800 x 0.550 x 0.500 = 2.695 M3

2 Urugan Pasir t = 10 cm 9.800 x 0.100 x 0.500 = 0.490 M3

3 Cerucuk Dia 8 - 200 9.800 = 24.500 = 24.000 x


0.400

4 Pondasi beton
0.200 + 0.400 x 0.450 x 2.765
2.000
0.200 + 0.400 x 0.450 + 0.200 +
2.000 2.000
2.765 M3
Tulangan
dia.12-150 2.765 = 18.433 = 18.000 x
0.150
6.200 = 41.333 = 41.000 x
0.150
11.000 x

7.000 x

Bekisting 2.765 mx 0.400 mx 2.000 = 2.212


6.200 mx 0.800 mx 2.000 = 9.920 +
12.132 M2

Urug Pasir 0.650 x 3.000 x 2.000 x 0.500 =

8 Ramp beton 2.765 x 1.750 x 0.120

Tulangan
M6 3.500 x 2.765 x 3.070 x 2.000 =
9 Kolom Pondasi Uk. 35 x 35 0.350 x 0.350 x 0.650 x #REF! =

tulangan
8 D 16 8.000 x 1.600 x 1.570 kg= 20.096 x

dia.8-150 0.200 + 1.000 = 2.333 = 2.000 x


0.150

bekisting 4.000 mx 0.350 mx 0.650 x #REF! =

Dikurangi = 15.000 x 0.200 x 0.300 x


= 113.000 x 0.250 x 0.450 x
= 30.000 x 0.200 x 0.100 x
10 Kolom Pondasi Uk. 35 x 75 0.350 x 0.750 x 0.650 x 1.000 =

tulangan
14 D 16 14.000 x 1.600 x 1.570 kg= 35.168 x

dia.8-150 0.200 + 1.000 = 2.333 = 2.000 x


0.150

bekisting 2.000 mx 1.100 mx 0.650 x 1.000 =

= 4.000 x 0.250 x 0.450 x

III PEKERJAAN STRUKTUR


A LANTAI I
Elevasi - 0,75
1 Sloof 25/55 1 2.650 x 1.000 = 2.650
1.150 x 2.000 = 2.300
1.650 x 2.000 = 3.300
8.250 x 0.200 x

3.000 x 1.000 = 3.000


1.500 x 2.000 = 3.000
2.000 x 2.000 = 4.000
10.000 M'

U 32 8 Dia 19 8.000 x 10.000 x 2.220 =

U 24 Dia 8 2.650 + 1.000 = 18.667 = 18.000 x


0.150
1.150 + 1.000 = 8.667 = 8.000 x
0.150
1.650 + 1.000 = 12.000 = 12.000 x
0.150
Bekisting 8.250 x 0.250 x 1.000 = 2.063
8.250 x 0.450 x 2.000 = 7.425 +
9.488 M2

2 Sloof 20/40 2.400 x 1.000 = 2.400


1.650 x 1.000 = 1.650
3.650 x 1.000 = 3.650
1.850 x 1.000 = 1.850
0.450 x 1.000 = 0.450
10.000 x 0.200 x

2.750 x 1.000 = 2.750


2.000 x 1.000 = 2.000
4.000 x 1.000 = 4.000
2.200 x 1.000 = 2.200
0.800 x 1.000 = 0.800
11.750 M'

U 32 5 Dia 16 5.000 x 11.750 x 1.570 =

U 24 Dia 8 2.400 + 1.000 = 17.000 = 17.000 x


0.150
1.650 + 1.000 = 12.000 = 12.000 x
0.150
3.650 + 1.000 = 25.333 = 25.000 x
0.150
1.850 + 1.000 = 13.333 = 13.000 x
0.150
0.450 + 1.000 = 4.000 = 4.000 x
0.150
Bekisting 10.000 x 0.200 x 1.000 = 2.000
10.000 x 0.300 x 2.000 = 6.000 +
8.000 M2
ELEVASI + 0,00
1 Sloof 25/55 A' 5.650 x 1.000 = 5.650 6.000 x
7.650 x 1.000 = 7.650 8.000 x
A 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
B 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
C 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
C' 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
D 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
1 6.150 x 2.000 = 12.300 6.500 x
2.650 x 2.000 = 5.300 3.000 x
2 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.200 x 1.000 = 6.200 6.750 x
2.200 x 1.000 = 2.200 2.750 x
3 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
4 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
5 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
6 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
7 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
320.975

320.975 x 0.250 x 0.450 = 36.110 M3

U 32 8 Dia 19 8.000 x 342.000 x 2.220 =


U 24 Dia 8 5.650 + 1.000 = 38.667 = 38.000 x
0.150
7.650 + 1.000 = 52.000 = 52.000 x
0.150
0.725 + 1.000 = 5.833 = 5.000 x
0.150
6.150 + 1.000 = 42.000 = 42.000 x
0.150
6.650 + 1.000 = 45.333 = 45.000 x
0.150
4.650 + 1.000 = 32.000 = 32.000 x
0.150
0.725 + 1.000 = 5.833 = 5.000 x
0.150
5.650 + 1.000 = 38.667 = 38.000 x
0.150
2.650 + 1.000 = 18.667 = 18.000 x
0.150
6.200 + 1.000 = 42.333 = 42.000 x
0.150
2.200 + 1.000 = 15.667 = 15.000 x
0.150
6.575 + 1.000 = 44.833 = 44.000 x
0.150
2.575 + 1.000 = 18.167 = 18.000 x
0.150

Bekisting 320.975 x 0.250 x 1.000 = 80.244


320.975 x 0.450 x 2.000 = 288.878 +
369.121 M2

2 Sloof 20/45 6.250 x 12.000 = 75.000 6.500 x


2.750 x 12.000 = 33.000 3.000 x
0.775 x 2.000 = 1.550 1.000 x
3.025 x 8.000 = 24.200 3.250 x
2.775 x 4.000 = 11.100 3.000 x
3.275 x 8.000 = 26.200 3.500 x
2.275 x 4.000 = 9.100 2.500 x
180.150

180.150 x 0.200 x 0.350 = 12.611 M3

U 32 6 Dia 16 6.000 x 192.000 x 1.570 =

U 24 Dia 8 6.250 + 1.000 = 42.667 = 42.000 x


0.150
2.750 + 1.000 = 19.333 = 19.000 x
0.150
0.775 + 1.000 = 6.167 = 6.000 x
0.150
3.025 + 1.000 = 21.167 = 21.000 x
0.150
2.775 + 1.000 = 19.500 = 19.000 x
0.150
3.275 + 1.000 = 22.833 = 22.000 x
0.150
2.275 + 1.000 = 16.167 = 16.000 x
0.150

Bekisting 180.150 x 0.200 x 1.000 = 36.030


180.150 x 0.350 x 2.000 = 126.105 +
162.135 M2
2 Sloof 20/40 22.000 x 1.000 = 22.000 22.000 x
2.700 x 4.000 = 10.800 3.000 x
2.750 x 2.000 = 5.500 3.000 x
3.025 x 1.000 = 3.025 3.250 x
1.775 x 1.000 = 1.775 2.000 x
43.100

43.100 x 0.200 x 0.300 = 2.586 M3

U 32 5 Dia 16 5.000 x 45.250 x 1.570 =

U 24 Dia 8 22.000 + 1.000 = 147.667 = 147.000 x


0.150
2.700 + 1.000 = 19.000 = 19.000 x
0.150
2.750 + 1.000 = 19.333 = 19.000 x
0.150
3.025 + 1.000 = 21.167 = 21.000 x
0.150
1.775 + 1.000 = 12.833 = 12.000 x
0.150
0.150

Bekisting 43.100 x 0.200 x 1.000 = 8.620


43.100 x 0.300 x 2.000 = 25.860 +
34.480 M2

2 Sloof 15/30 2.275 x 1.000 = 2.275 2.500 x


0.600 x 1.000 = 0.600 0.800 x
4.275 x 1.000 = 4.275 4.500 x
0.720 x 2.000 = 1.440 0.920 x
8.590
8.590 x 0.150 x 0.200 = 0.258 M3

U 32 4 Dia 16 4.000 x 9.640 x 1.040 =

U 24 Dia 8 2.275 + 1.000 = 16.167 = 16.000 x


0.150
0.600 + 1.000 = 5.000 = 5.000 x
0.150
4.275 + 1.000 = 29.500 = 29.000 x
0.150
0.720 + 1.000 = 5.800 = 5.000 x
0.150

Bekisting 8.590 x 0.150 x 1.000 = 1.289


8.590 x 0.200 x 2.000 = 3.436 +
4.725 M2

T Kolong 1.325 x 1.000 = 1.325


6.150 x 3.000 = 18.450
2.825 x 1.000 = 2.825
1.650 x 1.000 = 1.650
6.650 x 3.000 = 19.950
4.650 x 2.000 = 9.300
6.650 x 1.000 = 6.650
2.150 x 1.000 = 2.150
6.150 x 1.000 = 6.150
2.650 x 1.000 = 2.650
5.650 x 1.000 = 5.650
0.825 x 1.000 = 0.825 +
77.575 x 0.100 x

3.000 x 4.000 = 12.000


12.000 x 0.100 x
WM 6 89.575 x 0.200 x 3.070 = 54.999

Bekisting 77.575 x 0.200 x 2.000 = 31.030


12.000 x 0.350 x 2.000 = 8.400 +
39.430 M2

Lantai 6.200 x 3.000 = 18.600


8.200 x 3.000 = 24.600
39.225 x 19.250 = 755.081 +
798.281 x 0.100 =

2 x M6 798.281 x 2.000 x 3.070 = 4,901.447 Kg

Bekisting 798.281 - 126.182 = 672.099

dikurangi Sloof 25/55 320.975 x 0.250 = 80.244


Sloof 20/45 180.150 x 0.200 = 36.030
Sloof 20/40 43.100 x 0.200 = 8.620
Sloof 15/30 8.590 x 0.150 = 1.289 +
126.182

Kolom Type K1 Uk. 35/35 49.000 x 3.900 x 0.350 x 0.350 =

8 D 16 8.000 x 4.600 x 1.570 x 49.000 =

dia.8-150 3.450 + 1.000 = 24.000 = 24.000 x


0.150

bekisting 4.000 mx 0.350 mx 3.900 x 49.000 =

Dikurangi = 25.000 x 0.200 x 0.400 x


= 103.000 x 0.250 x 0.450 x
= 8.000 x 0.300 x 0.550 x
Kolom Type K2 Uk. 35/75 1.000 x 3.900 x 0.350 x 0.750 =

14 D 16 14.000 x 4.600 x 1.570 x 1.000 =

dia.8-150 3.450 + 1.000 = 24.000 = 24.000 x


0.150

bekisting 2.000 mx 1.100 mx 3.900 x 1.000 =

Dikurangi = 4.000 x 0.250 x 0.450 x

Kolom Type KT Uk. 20/20 1.000 x 2.000 x 0.200 x 0.200 =

4 D 16 4.000 x 2.000 x 1.570 x 1.000 =

dia.8-150 1.600 + 1.000 = 11.667 = 11.000 x


0.150

bekisting 4.000 mx 0.200 mx 2.000 x 1.000 =

Dikurangi = x 0.200 x 0.400 x


= x 0.200 x 0.400 x
= x 0.200 x 0.400 x
5 Kolom Praktis 9/9 cm 155.000 x 3.350 x 0.080 x 0.080 =

Dia 8 155.000 x 4.000 x 3.450 x 0.395

dia.8-150 3.350 + 1.000 = 23.333 = 23.000 x


0.150

bekisting 2.000 mx 0.090 mx 3.350 x 155.000 =

5 Balok 30/65 Elevasi + 4,00 1.650 x 2.000 = 3.300 2.000 x


7.650 x 1.000 = 7.650 8.000 x
1.150 x 1.000 = 1.150 1.500 x
12.100 x 0.300 x

12.100 x 0.300 x 0.550 = 1.997 M3

8 D 19 8.000 x 13.500 x 2.220 x 1.000 =

U 24 Dia 8 1.650 + 1.000 = 12.000 = 12.000 x


0.150
7.650 + 1.000 = 52.000 = 52.000 x
0.150
1.150 + 1.000 = 8.667 = 8.000 x
0.150

Bekisting 12.100 x 0.300 x 1.000 = 3.630


12.100 x 0.550 x 2.000 = 13.310 +
16.940 M2

2 Balok 25/55 Elevasi + 4,00 A' 1.350 x 1.000 = 1.350 1.650 x


5.650 x 1.000 = 5.650 6.000 x
2.650 x 1.000 = 2.650 3.000 x
3.650 x 1.000 = 3.650 4.000 x
1.150 x 1.000 = 1.150 1.500 x
A 2.475 x 1.000 = 2.475 2.650 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 2.000 = 9.300 5.000 x
B 0.650 x 1.000 = 0.650 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
C 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
C' 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
D 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
2 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.200 x 1.000 = 6.200 6.750 x
2.200 x 1.000 = 2.200 2.750 x
3 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
4 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
5 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
6 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
7 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.575 x 1.000 = 6.575 6.750 x
2.575 x 1.000 = 2.575 2.750 x
252.725

252.725 x 0.250 x 0.450 = 28.432 M3

U 32 8 Dia 19 8.000 x 269.000 x 2.220 =

U 24 Dia 8 252.725 + 1.000 = 1,685.833 = 1,685.000 x


0.150

Bekisting 252.725 x 0.250 x 1.000 = 63.181


252.725 x 0.450 x 2.000 = 227.453 +
290.634 M2
2 Balok 20/45 6.250 x 12.000 = 75.000 6.500 x
2.750 x 12.000 = 33.000 3.000 x
0.775 x 2.000 = 1.550 1.000 x
3.025 x 8.000 = 24.200 3.250 x
2.775 x 4.000 = 11.100 3.000 x
3.275 x 8.000 = 26.200 3.500 x
2.275 x 4.000 = 9.100 2.500 x
180.150

180.150 x 0.200 x 0.350 = 12.611 M3

U 32 6 Dia 16 6.000 x 192.000 x 1.570 =

U 24 Dia 8 6.250 + 1.000 = 42.667 = 42.000 x


0.150
2.750 + 1.000 = 19.333 = 19.000 x
0.150
0.775 + 1.000 = 6.167 = 6.000 x
0.150
3.025 + 1.000 = 21.167 = 21.000 x
0.150
2.775 + 1.000 = 19.500 = 19.000 x
0.150
3.275 + 1.000 = 22.833 = 22.000 x
0.150
2.275 + 1.000 = 16.167 = 16.000 x
0.150
Bekisting 180.150 x 0.200 x 1.000 = 36.030
180.150 x 0.350 x 2.000 = 126.105 +
162.135 M2

2 Balok 20/40 7.850 x 1.000 = 7.850 7.850 x


0.400 x 3.000 = 1.200 0.650 x
0.475 x 1.000 = 0.475 0.650 x
3.650 x 3.000 = 10.950 4.000 x
3.700 x 1.000 = 3.700 4.000 x
2.700 x 6.000 = 16.200 3.000 x
2.675 x 1.000 = 2.675 3.000 x
2.650 x 1.000 = 2.650 3.000 x
2.725 x 1.000 = 2.725 3.000 x
2.750 x 2.000 = 5.500 3.000 x
18.750 x 1.000 = 18.750 19.000 x
0.825 x 1.000 = 0.825 1.100 x
1.375 x 1.000 = 1.375 1.650 x
1.650 x 1.000 = 1.650 2.000 x
3.650 x 1.000 = 3.650 4.000 x
1.900 x 1.000 = 1.900 2.250 x
0.450 x 1.000 = 0.450 0.800 x
2.775 x 1.000 = 2.775 3.000 x
85.300

85.300 x 0.200 x 0.300 = 5.118 M3

U 32 5 Dia 16 5.000 x 93.250 x 1.570 =

U 24 Dia 8 85.300 + 1.000 = 569.667 = 569.000 x


0.150

Bekisting 85.300 x 0.200 x 1.000 = 17.060


85.300 x 0.300 x 2.000 = 51.180 +
68.240 M2
Balok 15/40 10.850 x 1.000 = 10.850 10.850 x
10.850

10.850 x 0.150 x 0.300 = 0.488 M3

U 32 4 Dia 13 4.000 x 10.850 x 1.040 =

U 24 Dia 8 10.850 + 1.000 = 73.333 = 73.000 x


0.150

Bekisting 10.850 x 0.150 x 1.000 = 1.628


10.850 x 0.300 x 2.000 = 6.510 +
8.138 M2

2 Balok 15/30 2.275 x 1.000 = 2.275 2.500 x


4.275 x 1.000 = 4.275 4.500 x
0.720 x 2.000 = 1.440 0.920 x
7.990

7.990 x 0.150 x 0.200 = 0.240 M3

U 32 4 Dia 16 4.000 x 8.840 x 1.040 =

U 24 Dia 8 2.275 + 1.000 = 16.167 = 16.000 x


0.150
4.275 + 1.000 = 29.500 = 29.000 x
0.150
0.720 + 1.000 = 5.800 = 5.000 x
0.150
Bekisting 7.990 x 0.150 x 1.000 = 1.199
7.990 x 0.200 x 2.000 = 3.196 +
4.395 M2

Lantai 39.225 x 19.200 = 753.120


= 91.195 +
661.925 x 0.100 =

4.300 x 2.800 = 12.040


4.300 x 6.300 = 27.090
4.300 x 6.300 = 27.090
4.500 x 2.775 = 12.488
4.500 x 2.775 = 12.488
91.195 x

2 x M6 661.925 x 2.000 x 3.070 = 4,064.220 Kg

Bekisting 661.925 - Err:509 = Err:509 M2

dikurangi Err:509 x =
Err:509 Err:509 x 0.250 =
Err:509 Err:509 x 0.200 =
Err:509 Err:509 x 0.200 =
Err:509 x 0.150 =
Err:509 Err:509 x 0.150 =

Dak 10.850 x 4.650 = 50.453


30.425 x 3.250 = 98.881 +
149.334 x 0.100 =

2 x M6 149.334 x 2.000 x 3.070 = 916.909 Kg

Bekisting 149.334 - Err:509 = Err:509 M2


dikurangi 63.525 x 0.200 = 12.705
Err:509 x 0.300 = Err:509
Err:509 x 0.150 = Err:509
14.975 x 0.250 = 3.744
Err:509

Kolom Type K1 Uk. 35/35 11.000 x 3.900 x 0.350 x 0.350 =


20.000 x 5.000 x 0.350 x 0.350 =

8 D 16 8.000 x 4.000 x 1.570 x 11.000 =


8.000 x 5.000 x 1.570 x 20.000 =

dia.8-150 3.450 + 1.000 = 24.000 = 24.000 x


0.150
4.450 + 1.000 = 30.667 = 30.000 x
0.150

bekisting 4.000 mx 0.350 mx 3.900 x 11.000 =


4.000 mx 0.350 mx 5.000 x 20.000 =

Dikurangi 25.000 = 19.000 x 0.200 x 0.400 x


103.000 = 78.000 x 0.250 x 0.450 x
8.000 = 6.000 x 0.300 x 0.550 x

Kolom Type K2 Uk. 35/75 1.000 x 5.000 x 0.350 x 0.750 =

14 D 16 14.000 x 4.600 x 1.570 x 1.000 =

dia.8-150 4.450 + 1.000 = 30.667 = 30.000 x


0.150

bekisting 2.000 mx 1.100 mx 5.000 x 1.000 =


Dikurangi = 4.000 x 0.250 x 0.450 x

5 Kolom Praktis 9/9 cm 143.000 x 3.450 x 0.090 x 0.090 =

Dia 8 143.000 x 4.000 x 3.450 x 0.395

dia.8-150 3.450 + 1.000 = 24.000 = 24.000 x


0.150

bekisting 2.000 mx 0.090 mx 3.450 x 143.000 =

2 Balok 25/55 Elevasi + 8,00 A 0.825 x 1.000 = 0.825 1.000 x


6.150 x 1.000 = 6.150 6.500 x
B 0.650 x 1.000 = 0.650 1.000 x
6.150 x 2.000 = 12.300 6.500 x
C 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
C' 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
D 0.725 x 1.000 = 0.725 1.000 x
6.150 x 2.000 = 12.300 6.500 x
5.650 x 1.000 = 5.650 6.000 x
6.650 x 2.000 = 13.300 7.000 x
4.650 x 1.000 = 4.650 5.000 x
1 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.200 x 1.000 = 6.200 6.750 x
2.200 x 1.000 = 2.200 2.750 x
2 6.150 x 1.000 = 6.150 6.500 x
2.650 x 1.000 = 2.650 3.000 x
6.200 x 1.000 = 6.200 6.750 x
2.200 x 1.000 = 2.200 2.750 x
132.975

132.975 x 0.250 x 0.450 = 14.960 M3

U 32 8 Dia 19 8.000 x 143.000 x 2.220 =

U 24 Dia 8 132.975 + 1.000 = 887.500 = 887.000 x


0.150

Bekisting 132.975 x 0.250 x 1.000 = 33.244


132.975 x 0.450 x 2.000 = 119.678 +
152.921 M2

2 Balok 25/55 + Paraped 2.500 x 1.000 = 2.500 2.500 x


2.500

2.500 x 0.250 x 0.550 = 0.344


2.500 x 0.100 x 0.100 = 0.025 +
0.369

U 32 8 Dia 19 8.000 x 2.500 x 2.220 =

U 24 Dia 8 2.500 + 1.000 = 17.667 = 17.000 x


0.150

Wiremesh M6 = 2.500 x 0.150 x 3.070 =

Bekisting 2.500 x 0.250 x 1.000 = 0.625


2.500 x 0.650 x 2.000 = 3.250 +
3.875 M2

2 Balok 20/45 19.000 x 1.000 = 19.000 19.000 x


3.275 x 2.000 = 6.550 3.500 x
0.775 x 2.000 = 1.550 1.000 x
2.750 x 2.000 = 5.500 3.000 x
2.650 x 5.000 = 13.250 3.000 x
45.850

45.850 x 0.200 x 0.350 = 3.210 M3

U 32 5 Dia 16 5.000 x 49.000 x 1.570 =

U 24 Dia 8 45.850 + 1.000 = 306.667 = 306.000 x


0.150

Bekisting 45.850 x 0.200 x 1.000 = 9.170


45.850 x 0.350 x 2.000 = 32.095 +
41.265 M2

2 Balok 20/45 + Paraped 2.300 x 1.000 = 2.300 2.500 x


2.650 x 4.000 = 10.600 3.000 x
6.250 x 2.000 = 12.500 6.500 x
25.400

25.400 x 0.200 x 0.450 = 2.286


25.400 x 0.100 x 0.100 = 0.254 +
2.540

U 32 5 Dia 16 5.000 x 27.500 x 1.570 =

U 24 Dia 8 25.400 + 1.000 = 170.333 = 170.000 x


0.150
Wiremesh M6 = 25.400 x 0.150 x 3.070 =

Bekisting 25.400 x 0.200 x 1.000 = 5.080


25.400 x 0.550 x 2.000 = 27.940 +
33.020 M2

Balok 15/40 2.750 x 5.000 = 13.750 3.000 x


13.750

13.750 x 0.150 x 0.300 = 0.619 M3

U 32 4 Dia 13 4.000 x 15.000 x 1.040 =

U 24 Dia 8 2.750 + 1.000 = 19.333 = 19.000 x


0.150

Bekisting 13.750 x 0.150 x 1.000 = 2.063


13.750 x 0.300 x 2.000 = 8.250 +
10.313 M2

11 Plat Lantai t = 10 cm 39.000 x 3.200 = 124.800


7.725 x 16.000 = 123.600
248.400 - 27.025 =

Dikurangi 2.300 x 6.250 = 14.375


2.300 x 2.750 = 6.325
2.300 x 2.750 = 6.325
27.025

Wiremesh M6
221.375 x 2.000 x 3.070 = 1,359.243 Kg
Bekisting 221.375 x 1.000 x 1.000 = 221.375
116.600 x 0.100 x 1.000 = 11.660 +
233.035 -

Dikurang Balok 25/55 132.975 x 0.250 =


Balok 20/55 + Paraped 2.500 x 0.250 =
Balok 20/45 45.850 x 0.200 =
Balok 20/45 + Paraped 25.400 x 0.200 =
Balok 15/40 13.750 x 0.150 =

5 Kolom Praktis 9/9 cm 9.000 x 3.450 x 0.090 x 0.090 =

Dia 8 9.000 x 4.000 x 3.450 x 0.395

dia.8-150 3.450 + 1.000 = 24.000 = 24.000 x


0.150

bekisting 2.000 mx 0.090 mx 3.450 x 9.000 =

Elevasi + 8,00 dan + 9,00


Ring Balok 25/55 6.450 x 1.000 = 6.450
1.950 x 1.000 = 1.950
6.150 x 2.000 = 12.300
5.650 x 1.000 = 5.650
6.650 x 2.000 = 13.300
4.650 x 1.000 = 4.650
44.300

44.300 x 0.250 x 0.550 = 6.091 M3

U 32 8 Dia 19 8.000 x 47.500 x 2.220 =

U 24 Dia 8 44.300 + 1.000 = 296.333 = 296.000 x


0.150

Bekisting 44.300 x 0.250 x 1.000 = 11.075


44.300 x 0.550 x 2.000 = 48.730 +
59.805 M2

Ring Balok 20/45 6.150 x 6.000 = 36.900


5.650 x 2.000 = 11.300
6.650 x 6.000 = 39.900
4.650 x 3.000 = 13.950
2.150 x 1.000 = 2.150
104.200

104.200 x 0.200 x 0.450 = 9.378 M3

U 32 5 Dia 16 5.000 x 110.500 x 1.570 =

U 24 Dia 8 104.200 + 1.000 = 695.667 = 695.000 x


0.150

Bekisting 104.200 x 0.200 x 1.000 = 20.840


104.200 x 0.450 x 2.000 = 93.780 +
114.620 M2

Ring Balok 9/9 120.000 x 1.000 = 120.000


120.000

120.000 x 0.090 x 0.090 = 0.972 M3

U 32 4 Dia 8 4.000 x 39.000 x 0.395


U 24 Dia 8 120.000 + 1.000 = 801.000 = 801.000 x
0.150

Bekisting 120.000 x 0.090 x 2.000 = 21.600


21.600 M2

Atap 33.800 + 15.500 x 10.500 x 2.000 =


2
0.500 x 15.500 x 10.500 x 2.000 =

Perabung 15.500 + 15.012 x 4.000 = 75.546 M'

Lisplank 98.600 M'

12 Balok Miring Tribun Uk. 20/40 cm 3.000 x 4.000 = 12.000 x 0.200 x

3.100 x 4.000 = 12.400

U 32 5 Dia 16 5.000 x 12.400 x 1.570 =

U 24 Dia 8 3.000 + 1.000 = 21.000 = 21.000 x


0.150
Bekisting 12.000 x 0.200 x 1.000 = 2.400
12.000 x 0.300 x 2.000 = 7.200 +
9.600 M2
13 Balok 15/40 Elevasi + 3,75 3.700 x 3.000 = 11.100 4.000 x

11.100 x 0.150 x 0.300 = 0.500 M3

U 32 4 Dia 16 4.000 x 12.000 x 1.570 =

U 24 Dia 8 3.700 + 1.000 = 25.667 = 25.000 x


0.150

Bekisting 11.100 x 0.150 x 1.000 = 1.665


11.100 x 0.300 x 2.000 = 6.660 +
8.325 M2

14 Balok 20/40 Elevasi + 3,75 1.500 x 4.000 = 6.000 1.500 x


3.700 x 3.000 = 11.100 + 4.000 x
17.100

17.100 x 0.200 x 0.300 = 1.026 M3

U 32 5 Dia 16 5.000 x 18.000 x 1.570 =

U 24 Dia 8 1.500 + 1.000 = 11.000 = 11.000 x


0.150
3.700 + 1.000 = 25.667 = 25.000 x
0.150

Bekisting 17.100 x 0.200 x 1.000 = 3.420


17.100 x 0.300 x 2.000 = 10.260 +
13.680 M2

15 Plat Lantai t = 10 cm elevasi + 3,75 12.200 x 3.100 = 37.820


12.200 x 5.200 = 63.440 +
101.260 x 0.100 =
Wiremesh M6
101.260 x 2.000 x 3.070 = 621.736 Kg

Bekisting 101.260 x 1.000 x 1.000 = 101.260


101.260 -

Dikurang 29.100 x 0.200 = 5.820


11.100 x 0.150 = 1.665 +
7.485 M2

16 Plat Tribun 0.500 x 0.500 x 0.100 x 12.200 x

Wiremesh M6
0.700 x 12.200 x 3.070 x 9.000 =

Bekisting 0.100 x 12.200 x 9.000 = 10.980 M2


17 Kolom Type K1 Dia 30 cm 8.000 x 8.500 x 3.140 x 0.150 x
4.000 x #REF! x 3.140 x 0.150 x
4.000 4 #REF! x 3.140 x 0.150 x

8 D 16 8.000 x 8.500 x 1.570 x 8.000 =


8.000 x #REF! x 1.570 x 4.000 =
8.000 x #REF! x 1.570 x 4.000 =

dia.8-150 8.100 + 1.000 = 55.000 = 55.000 x


0.150
#REF! + 1.000 = #REF! = #REF! x
0.150
#REF! + 1.000 = #REF! = #REF! x
0.150

bekisting 2.000 mx 3.150 mx 0.150 x 8.500 x


2.000 mx 3.150 mx 0.150 x #REF! x
2.000 mx 3.150 mx 0.150 x #REF! x

Dikurangi = 40.000 x 0.150 x 0.300 x


= 2.000 x 0.200 x 0.300 x
= 12.000 x 0.150 x 0.400 x

18 Balok 15/40 Elevasi + 6,2 3.700 x 12.000 = 44.400 4.000 x


0.625 x 16.000 = 10.000 0.800 x
54.400

54.400 x 0.150 x 0.300 = 2.448 M3

U 32 4 Dia 16 4.000 x 60.800 x 1.570 =


U 24 Dia 8 3.700 + 1.000 = 25.667 = 25.000 x
0.150
0.625 + 1.000 = 5.167 = 5.000 x
0.150

Bekisting 44.400 x 0.150 x 1.000 = 6.660


44.400 x 0.300 x 2.000 = 26.640 +
33.300 M2

19 Balok 15/30 Elevasi + 6,2 13.700 x 3.000 = 41.100 13.700 x


4.800 x 2.000 = 9.600 5.000 x
50.700

50.700 x 0.150 x 0.200 = 1.521 M3

U 32 4 Dia 13 4.000 x 51.100 x 1.040 =

U 24 Dia 8 13.700 + 1.000 = 92.333 = 92.000 x


0.150
4.800 + 1.000 = 33.000 = 33.000 x
0.150

Bekisting 50.700 x 0.150 x 1.000 = 7.605


50.700 x 0.200 x 2.000 = 20.280 +
27.885 M2
20 Plat Dak t = 9 cm Elevasi +6,2 13.700 x 0.925 = 12.673
13.700 x 0.925 = 12.673
11.850 x 0.925 = 10.961
4.000 x 0.925 = 3.700
4.000 x 0.925 = 3.700 +
43.706 x 0.090 =

Wiremesh M6
43.706 x 1.000 x 3.070 = 134.178 Kg

Bekisting 43.706 x 1.000 x 1.000 = 43.706


43.706 -

Dikurang 54.400 x 0.150 = 8.160


50.700 x 0.150 = 7.605 +
15.765 M2

21 Balok Dak Koridor 20/40 Elevasi + 7,5 3.700 x 1.000 = 3.700 4.000 x
3.700

3.700 x 0.200 x 0.400 = 0.296 M3

U 32 5 Dia 16 5.000 x 4.000 x 1.570 =

U 24 Dia 8 3.700 + 1.000 = 25.667 = 25.000 x


0.150

Bekisting 3.700 x 0.200 x 1.000 = 0.740


3.700 x 0.300 x 2.000 = 2.220 +
2.960 M2

22 Ring Balok 15/40 Elevasi 8,70 3.700 x 12.000 = 44.400 4.000 x


44.400

44.400 x 0.150 x 0.400 = 2.664 M3

U 32 4 Dia 16 4.000 x 48.000 x 1.570 =

U 24 Dia 8 3.700 + 1.000 = 25.667 = 25.000 x


0.150

Bekisting 44.400 x 0.150 x 1.000 = 6.660


44.400 x 0.300 x 2.000 = 26.640 +
33.300 M2
1 Rangka Kuda - Kuda 16.300 + 3.000 x 9.100 = 87.815 x
2

2 Atap 16.300 + 3.000 x 9.100 = 87.815 x


2

3 Perabung 10.900 x 4.000 = 43.600 M'

4 Ornamen Atap 0.500 x 3.100 x 3.000 = 4.650 x


UNGAN VOLUME
PERHITUNGAN VOLUME TOTAL

2.000 = 30.000 Btg

0.600 x 0.890 = 21.360

6.000 x 0.395 = 7.110 +


28.470

= 0.792
4.000 = 0.540 +
1.332 M3

2.300 x 0.890 = 81.880

2.000 x 0.890 = 71.200

6.000 x 0.890 = 74.760 +


227.840 Kg
2.000 = 40.000 Btg

0.600 x 0.890 = 28.302

8.000 x 0.890 = 21.360 +


49.662

= 1.056
4.000 = 0.720 +
1.776 M3

2.300 x 0.890 = 108.491

2.000 x 0.890 = 94.340

8.000 x 0.890 = 99.680 +


302.511 Kg
0.300 = 0.123 0.123 -
0.123 M3

12.480 Kg 12.480 Kg

0.700 x 0.395 = 5.254 x 1.000 = 5.254

5.254 Kg 5.254 Kg

2.044 M2

0.080

12.560 Kg

0.600 x 0.395 = 2.607 Kg 2.607 Kg

1.600 - 0.045 = 1.555 M2 1.555 M2

1.000 = 0.045 M2

= 0.693
= 0.360
25.000 = 0.866 +
1.919 M3

0.890 = 25.365 x 2.000 = 50.730

0.890 = 34.265 x 2.000 = 68.530

0.890 = 17.800 x 2.000 = 35.600

0.890 = 16.020 x 2.000 = 32.040 +


186.900

25.000 = 63.319 Kg

1.000 = 24.000 Btg

= 0.373

0.400 x 1.200 x 6.200 = 3.069


3.442
1.350 x 0.890 = 21.627

4.200 x 0.890 = 153.258

6.200 x 0.890 = 60.698

2.765 x 0.890 = 17.226 +


252.809

1.950 M3

= 0.581
0.581 M3

59.420
#REF! M3
- -

#REF! = #REF! +
#REF! Kg #REF! Kg

1.200 x 0.395 = 0.948 x #REF! = #REF! +


#REF! Kg #REF! Kg

#REF! - 14.213 = #REF! M2


- -
1.000 = 0.900
1.000 = 12.713
1.000 = 0.600 +
14.213 M2
0.171 M3
- -

1.000 = 35.168 +
35.168 Kg 35.168 Kg

2.000 x 0.395 = 1.580 x 1.000 = 1.580 +


1.580 Kg 1.580 Kg

1.430 - 0.450 = 0.980 M2


- -
1.000 = 0.450
0.450 M2

0.400 = 0.660 0.660 -


0.660 M3

177.600 Kg 177.600 Kg

1.500 x 0.395 = 10.665 x 1.000 = 10.665

1.500 x 0.395 = 4.740 x 2.000 = 9.480

1.500 x 0.395 = 7.110 x 2.000 = 14.220 +


34.365 Kg 34.365 Kg
9.488 M2

0.300 = 0.600 M3 0.600 M3

92.238 Kg x 1.000 = 92.238 +


92.238 Kg 92.238 Kg

1.100 x 0.395 = 7.387 x 1.000 = 7.387

1.100 x 0.395 = 5.214 x 1.000 = 5.214

1.100 x 0.395 = 10.863 x 1.000 = 10.863

1.100 x 0.395 = 5.649 x 1.000 = 5.649

1.100 x 0.395 = 1.738 x 1.000 = 1.738


30.850 Kg 30.850 Kg
8.000 M2
1.000 = 6.000
1.000 = 8.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000
2.000 = 14.000
1.000 = 5.000
2.000 = 13.000
2.000 = 6.000
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
342.000

6,073.920 Kg 6,073.920 Kg
1.500 x 0.395 = 22.515 x 6.000 = 135.090

1.500 x 0.395 = 30.810 x 1.000 = 30.810

1.500 x 0.395 = 2.963 x 2.000 = 5.925

1.500 x 0.395 = 24.885 x 18.000 = 447.930

1.500 x 0.395 = 26.663 x 10.000 = 266.625

1.500 x 0.395 = 18.960 x 5.000 = 94.800

1.500 x 0.395 = 2.963 x 3.000 = 8.888

1.500 x 0.395 = 22.515 x 3.000 = 67.545

1.500 x 0.395 = 10.665 x 8.000 = 85.320

1.500 x 0.395 = 24.885 x 1.000 = 24.885

1.500 x 0.395 = 8.888 x 1.000 = 8.888

1.500 x 0.395 = 26.070 x 5.000 = 130.350

1.500 x 0.395 = 10.665 x 5.000 = 53.325

1,360.380 Kg 1,360.380 Kg

369.121 M2

12.000 = 78.000
12.000 = 36.000
2.000 = 2.000
8.000 = 26.000
4.000 = 12.000
8.000 = 28.000
4.000 = 10.000
192.000

1,808.640 Kg 1,808.640 Kg

1.200 x 0.395 = 19.908 x 12.000 = 238.896

1.200 x 0.395 = 9.006 x 12.000 = 108.072

1.200 x 0.395 = 2.844 x 2.000 = 5.688

1.200 x 0.395 = 9.954 x 8.000 = 79.632

1.200 x 0.395 = 9.006 x 4.000 = 36.024

1.200 x 0.395 = 10.428 x 8.000 = 83.424

1.200 x 0.395 = 7.584 x 4.000 = 30.336 +


582.072

162.135 M2
1.000 = 22.000
4.000 = 12.000
2.000 = 6.000
1.000 = 3.250
1.000 = 2.000
45.250

355.213 Kg 355.213 Kg

1.100 x 0.395 = 63.872 x 1.000 = 63.872

1.100 x 0.395 = 8.256 x 4.000 = 33.022

1.100 x 0.395 = 8.256 x 2.000 = 16.511

1.100 x 0.395 = 9.125 x 1.000 = 9.125

1.100 x 0.395 = 5.214 x 1.000 = 5.214

127.743

34.480 M2

1.000 = 2.500
1.000 = 0.800
1.000 = 4.500
2.000 = 1.840
9.640
40.102 Kg 40.102 Kg

1.100 x 0.395 = 6.952 x 1.000 = 6.952

1.100 x 0.395 = 2.173 x 1.000 = 2.173

1.100 x 0.395 = 12.601 x 1.000 = 12.601

1.100 x 0.395 = 2.173 x 2.000 = 4.345

26.070 Kg 26.070 Kg

4.725 M2

0.200 = 1.552

0.350 = 0.420 +
1.972 M3

39.430 M2

79.828 M3

23.410

2,831.024 Kg

1.200 x 0.395 = 11.376 x 8.590 = 97.720 Kg 97.720 Kg

267.540 - 16.908 = 250.633 M2 250.633 M2

2.000 = 4.000
1.000 = 11.588
1.000 = 1.320 +
16.908 M2
1.024

101.108 Kg

2.000 x 0.395 = 18.960 x - = - Kg - Kg

8.580 - 0.450 = 8.130 M2 8.130 M2

1.000 = 0.450
0.450 M2

0.080

12.560 Kg

0.600 x 0.395 = 2.607 Kg 2.607 Kg

1.600 - - = 1.600 M2 1.600 M2

2.000 = -
3.000 = -
4.000 = - +
- M2
3.323 M3 3.323 M3

= 844.905

0.200 x 0.395 = 1.817 x 155.000 = 281.635


1,126.540 1,126.540 Kg

93.465 M2 93.465 M2
13.500
2.000 = 4.000
1.000 = 8.000
1.000 = 1.500
0.550 = 1.997 M3 1.997 M3

239.760 Kg 239.760 Kg

1.800 x 0.395 = 8.532 x 2.000 = 17.064

1.800 x 0.395 = 36.972 x 1.000 = 36.972

1.800 x 0.395 = 5.688 x 1.000 = 5.688

17.064 Kg 17.064 Kg

16.940 M2
5.650
1.000 = 1.650
1.000 = 6.000 1.000
1.000 = 3.000
1.000 = 4.000
1.000 = 1.500
1.000 = 2.650
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
2.000 = 10.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
269.000

4,777.440 Kg 4,777.440 Kg

1.500 x 0.395 = 998.363

290.634 M2
12.000 = 78.000
12.000 = 36.000
2.000 = 2.000
8.000 = 26.000
4.000 = 12.000
8.000 = 28.000
4.000 = 10.000
192.000

1,808.640 Kg 1,808.640 Kg

1.200 x 0.395 = 19.908 x 12.000 = 238.896

1.200 x 0.395 = 9.006 x 12.000 = 108.072

1.200 x 0.395 = 2.844 x 2.000 = 5.688

1.200 x 0.395 = 9.954 x 8.000 = 79.632

1.200 x 0.395 = 9.006 x 4.000 = 36.024

1.200 x 0.395 = 10.428 x 8.000 = 83.424

1.200 x 0.395 = 7.584 x 4.000 = 30.336 +


582.072 Kg 582.072 Kg
162.135 M2

1.000 = 7.850
3.000 = 1.950
1.000 = 0.650
3.000 = 12.000
1.000 = 4.000
6.000 = 18.000
1.000 = 3.000
1.000 = 3.000
1.000 = 3.000
2.000 = 6.000
1.000 = 19.000
1.000 = 1.100
1.000 = 1.650
1.000 = 2.000
1.000 = 4.000
1.000 = 2.250
1.000 = 0.800
1.000 = 3.000
93.250

732.013 Kg 732.013 Kg

1.100 x 0.395 = 247.231 x 1.000 = 247.231

247.231

68.240 M2
1.000 = 10.850
10.850

45.136 Kg 45.136 Kg

1.000 x 0.395 = 28.835 x 1.000 = 28.835

28.835

8.138 M2

1.000 = 2.500
1.000 = 4.500
2.000 = 1.840
8.840

36.774 Kg 36.774 Kg

1.100 x 0.395 = 6.952 x 1.000 = 6.952

1.100 x 0.395 = 12.601 x 1.000 = 12.601

1.100 x 0.395 = 2.173 x 2.000 = 4.345

23.898
4.395 M2

66.193 M3

-
Err:509
Err:509
Err:509
Err:509
Err:509 +
Err:509 M2

14.933 M3
5.255
12.250 +
17.505

552.640
1,256.000 +
1,808.640 Kg

1.200 x 0.395 = 11.376 x 11.000 = 125.136

1.200 x 0.395 = 14.220 x 20.000 = 284.400 +


409.536 Kg 409.536 Kg

60.060
140.000
200.060 - 12.805 = 187.255 M2 187.255 M2

2.000 = 3.040
1.000 = 8.775
1.000 = 0.990 +
12.805 M2

1.313

101.108 Kg

2.000 x 0.395 = 23.700 - -

11.000 - 0.450 = 10.550 M2 10.550 M2


1.000 = 0.450
0.450 M2

3.996 M3 3.996 M3

= 779.493

0.200 x 0.395 = 1.896 x 143.000 = 271.128


1,050.621 1,050.621 Kg

88.803 M2 88.803 M2

1.000 = 1.000
1.000 = 6.500
1.000 = 1.000
2.000 = 13.000
1.000 = 1.000
2.000 = 13.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
143.000

2,539.680 Kg 2,539.680 Kg

1.500 x 0.395 = 525.548

152.921 M2

1.000 = 2.500
2.500

44.400 Kg 44.400 Kg

1.500 x 0.395 = 10.073 x 1.000 = 10.073

10.073

1.151 Kg
3.875 M2

1.000 = 19.000
2.000 = 7.000
2.000 = 2.000
2.000 = 6.000
5.000 = 15.000
49.000

384.650 Kg 384.650 Kg

1.200 x 0.395 = 145.044 x 1.000 = 145.044

145.044

41.265 M2

1.000 = 2.500
4.000 = 12.000
2.000 = 13.000
27.500

215.875 Kg 215.875 Kg

1.200 x 0.395 = 80.580 x 1.000 = 80.580


80.580

11.697 Kg

33.020 M2

5.000 = 15.000
15.000

62.400 Kg 62.400 Kg

1.000 x 0.395 = 7.505 x 5.000 = 37.525 Kg 37.525 Kg

10.313 M2

221.375 x 0.100 = 22.138 M3 221.375 x

1,359.243 Kg
50.181 = 182.854 M2 182.854 M2

33.244
0.625
9.170
5.080
2.063 +
50.181 M2

0.252 M3 0.252 M3

= 49.059

0.200 x 0.395 = 1.896 x 9.000 = 17.064


66.123 66.123 Kg

5.589 M2 5.589 M2

7.000 x 1.000 = 7.000


2.500 x 1.000 = 2.500
6.500 x 2.000 = 13.000
6.000 x 1.000 = 6.000
7.000 x 2.000 = 14.000
5.000 x 1.000 = 5.000
47.500

843.600 Kg 843.600 Kg

1.500 x 0.395 = 175.380


59.805 M2

6.500 x 6.000 = 39.000


6.000 x 2.000 = 12.000
7.000 x 6.000 = 42.000
5.000 x 3.000 = 15.000
2.500 x 1.000 = 2.500
110.500

867.425 Kg 867.425 Kg

1.200 x 0.395 = 329.430

114.620 M2

6.500 x 6.000 = 39.000


39.000

= 61.620
0.420 x 0.395 = 132.886 +
194.506 194.506 Kg

21.600 M2

517.650

162.750 +
680.400 M2

0.300 = 0.720 m3 0.720 m3

97.340 Kg x 1.000 = 97.340 +


97.340 Kg 97.340 Kg

1.300 x 0.395 = 10.784 x 4.000 = 43.134

43.134 43.134 Kg
9.600 M2
3.000 = 12.000

0.500 M3

75.360 Kg x 1.000 = 75.360 +


75.360 Kg 75.360 Kg

1.000 x 0.395 = 9.875 x 3.000 = 29.625

29.625

8.325 M2

4.000 = 6.000
3.000 = 12.000 +
18.000

1.026 M3

141.300 Kg x 1.000 = 141.300 +


141.300 Kg 141.300 Kg

1.100 x 0.395 = 4.780 x 4.000 = 19.118

1.100 x 0.395 = 10.863 x 3.000 = 32.588 +


51.706 Kg 51.706 Kg

13.680 M2

10.126 M3 10.126 M3
621.736 Kg

- -

7.485 = 93.775 M2 101.260 M2

9.000 = 2.745 M3

235.960 Kg
0.150 = 4.804
0.150 = #REF!
0.150 = #REF! +
#REF! M3 #REF! M3

854.080
#REF!
#REF!
#REF! Kg #REF! Kg

1.570 x 0.395 = 34.108 x 8.000 = 272.866

1.570 x 0.395 = #REF! x 4.000 = #REF!

1.570 x 0.395 = #REF! x 4.000 = #REF! +


#REF! Kg #REF! Kg

8.000 = 68.000
4.000 = #REF!
4.000 = #REF! +
#REF! - 2.640 = #REF! M2 #REF! M2

1.000 = 1.800
1.000 = 0.120
1.000 = 0.720 +
2.640 M2

12.000 = 48.000
16.000 = 12.800
60.800

2.448 M3

381.824 Kg x 1.000 = 381.824 +


381.824 Kg 381.824 Kg
1.000 x 0.395 = 9.875 x 12.000 = 118.500

1.000 x 0.395 = 1.975 x 16.000 = 31.600

150.100

33.300 M2

3.000 = 41.100
2.000 = 10.000
51.100

1.521 M3

212.576 Kg x 1.000 = 212.576 +


212.576 Kg 212.576 Kg

1.000 x 0.395 = 36.340 x 3.000 = 109.020

1.000 x 0.395 = 13.035 x 2.000 = 26.070

135.090 M3 135.090 M3

27.885 M2
3.934 M3 3.934 M3

134.178 Kg

- -

15.765 = 27.941 M2 27.941 M2

1.000 = 4.000
4.000

0.296 M3

31.400 Kg x 1.000 = 31.400 +


31.400 Kg 31.400 Kg

1.100 x 0.395 = 10.863 x 1.000 = 10.863 +

10.863 Kg 10.863 Kg

2.960 M2

12.000 = 48.000
48.000

2.664 M3

301.440 Kg x 1.000 = 301.440 +


301.440 Kg 301.440 Kg

1.000 x 0.395 = 9.875 x 12.000 = 118.500 +


118.500 Kg

33.300 M2
4.000 = 351.260 M2 351.260 M2

4.000 = 351.260 M2 351.260 M2

43.600 M'

4.000 = 18.600 M2 18.600 M2


LAMPIRAN 2 : KEPUTUSAN WALIKOTA PONTIANAK
NOMOR : ………………… TAHUN 2010
TANGGAL : ……………-…………2010

TENTANG
DAFTAR HARGA SATUAN TANAMAN HIAS
DI KOTA PONTIANAK TAHUN 2010
Periode : Januari 2010

NO JENIS BAHAN PERTAMANAN UKURAN


TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5

I. RUMPUT (LAWN)
1 Rumput gajah ( Axonopus sp )
a. Tandur 100 Titik/M2 M2
b. Lempeng, jarak lempeng + 2 cm 25 x 25 cm M2
2 Rumput golf (Tifton grass) Tandur 100 Titik/M2 M2
3 Rumput manila (Zoysia matrela),jrk lempeng 2 cm 25 x 25 cm M2
4 Rumput manila (Zoysia matrela) Tandur 100 Titik/M2 M2

II PENUTUP TANAH
1 Anggrek tanah (Sphatoglotis plicata), rumpun 35 - 40 2 btg, 3 anakan Polybag
2 Bayam merah (Alteanthera ficoidea), rumpun 20 - 25 1 btg/rumpun Polybag
3 Beludru coklat (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag
4 Beludru Hijau (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag
5 Botan (Centaurea candisina) 25 - 30 1 btg Polybag
6 Cendrawasih (Phyllantus sp) 15 - 20 Tajuk 20 - 25 Polybag
7 Cocor bebek (Kalanchoe pinnata) 15 - 20 1 btg Polybag
8 Crossandra 20 - 40 Tajuk 20 - 25 Polybag
9 Dinding ari (Hemigraphis colorata) 7 - 10 3 s/d 4 btg/rpn Polybag
10 Dracaena Tricolor 30 Polybag
11 Gandarusa 15 3 s/d 4 btg/rpn Polybag
12 Jengger ayam air mancur daun besar 15 - 20 dia. 1 btg Polybag
13 Jengger ayam air mancur daun kecil 15 - 20 dia. 1 btg Polybag
14 Jengger ayam a.m. protol besar 20 - 25 dia. Btg 1 cm Polybag
15 Jengger ayam a.m. protol kecil 20 - 25 dia. Btg 1 cm Polybag
16 Kembang coklat putih (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag
17 Kembang coklat merah muda (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag
18 Krokot (Althernantera amoenna) 10 5 btg/rpn Polybag
19 Lili paris bintang (Chlorophytum sp) 10 - 12 1 btg/rpn Polybag
20 Lili paris kasar (Ophiopogon jaburan) 20 - 25 5 s/d 7 btg/rpn Polybag
21 Lili paris kasar (Ophiopogon jaburan) 25-35 5 s/d 7 btg/rpn Polybag
22 Lili paris kucai (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag
21 Lili paris umbi (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag
22 Lili paris brazil (Chlorophytum sp) 15 - 20 3 s/d 5 btg/rpn Polybag
24 Mirten perak (Malphigia sp) 20 - 25 3 s/d 5 btg/rpn Polybag
25 Mirten rebah (Malphigia sp) 10 - 15 Tajuk 10 - 15 Polybag
26 Mirten tegak (Malphigia sp) 30 - 35 3 btg/rpn Polybag
27 Nanas kerang (Rhoeo discolor) 3-5 1 btg Polybag
28 Nanas merah (Ananas sp) 15-20 Tajuk 20 - 25 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
28 Nanas merah (Ananas sp) 30-40 Tajuk 20 - 25 Polybag
29 Seruni rambat (Wedelia trilobata) 10 3 s/d 5 btg/rpn Polybag
30 Sutra bombai banci (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag
31 Sutra bombai ungu (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag
32 Tagetes (Tagetes erecta) 20 - 25 Tajuk 15 - 20 Polybag
33 Nanas kerang (Rhoeo discolor) 20 1 btg Polybag
34 Katis kodok hijau (Sansiviera sp) isi 10 10 10 btg/pot Polybag
35 Katis kodok kuning (Sansiviera sp) isi 10 10 10 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
36 Pedang-pedangan strip kuning (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag
37 Pedang-pedangan strip hijau (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag
38 Pandan Kuning Africa 30 Polybag
39 Pangkas kuning kecil (Duranta repens) 10 3 s/d 5 btg/rpn Polybag
40 Pangkas kuning sedang (Duranta repens) 15 3 s/d 5 btg/rpn Polybag
41 Lantana Warna-Warni 15 3 s/d 5 btg/rpn Polybag
42 Taiwan Beauty bunga ungu (Cuphea sp) 25 Tajuk 15 Polybag
44 Taiwan Beauty bunga ungu (Cuphea sp) 16 Tajuk 15 Polybag
45 Cover Crop (Kacang-kacangan) 7-10 10 btg / rpn Polybag

III PERDU
1 Agave putih (Agave sp) 40 dia. Tajuk 30 Polybag
2 Agave biasa (Agave sp) 50 dia. Tajuk 40 Polybag
3 Aglonema (Aglaonema sp) 40 3 btg Polybag
4 Bilawan (Plumbago aphylia) 10 - 15 3 btg Polybag
5 Bougenvil berbunga bentukan penuh 60 dia.Tajuk 60 Polybag
6 Bougenvil hawai (Bougainvillea sp) 60 dia.Tajuk 60 Polybag
7 Bougenvil Biasa 60 dia.Tajuk 60 Polybag
8 Dendron biasa (Phillodendron sp) 15 - 20 1 btg Polybag
9 Dendrose lokal Jkt Merah 20 - 40 dia.Tajuk 10-15 Polybag
10 Balanceng india (Dieffenbachia sp) 30 3 daun/btg Polybag
11 Dracena tricolor (Dracena sp) 30 dia. Tajuk 30 Polybag
12 Kacapiring (Gardenia sp) 50 dia. Tajuk 30 Polybag
13 Pisang-pisangan (Heliconia sp) bunga
kuning / merah 50 2 s/d 3 btg/rpn Polybag
14 Spatiphylum lokal (Spatiphylum sp) 15 - 20 3 bth/pot Polybag
15 Spatiphylum luar (Spatiphylum sp) 15 - 20 3 btg Polybag
16 Beringin putih kecil (Ficus hybrida) ex Jkt 30 diaTajuk 15 -20 Polybag
17 Kamboja jepang (Adenium cutanium) bercabang 30 dia.Tajuk 15-20 Polybag
18 Kamboja putih 100 dia. Btg 3 Polybag
19 Kamboja rantai 100 dia. Btg 3 Polybag
20 Kana (Canna hibrida) 40 2 s/d 3 btg/rpn Polybag
21 Kastuba (Euphorbia pulcherima) 25 - 30 dia. Tajuk 30 Polybag
22 Kembang sepatu putih (Hibiscus mutabilis) 30 1 btg/pot Polybag
23 Lusiana 50 - 75 dia. Btg 1,5 Polybag
24 Mawar putih (Rosa Hybrida) 25 dia.Tajuk15 -20 Polybag
25 Mawar merah (Rosa Hybrida) 30 dia.Tajuk 15-20 Polybag
26 Melati costa (Jasminum sp) 50 2 anakan/rpn Polybag
27 Melati Gambir (Jasminum sp) 50 2 anakan/rpn Polybag
28 Melati Malaysia Polybag
29 Oleander (Nerium indicum) 30 1 rpn Polybag
30 Pepayungan (Cyperus altemifolius) 60 5 anakan/pot Polybag
31 Pandan hijau jepang (Pandanus sp) 50 1 rpn Polybag
32 Pandan kuning afrika 50 1 rpn Polybag
33 Pangkas Hijau 10 3 s/d 5 btg/rpn Polybag
33 Pangkas Hijau 20-40 3 s/d 5 btg/rpn Polybag
34 Variegata Polybag
34 Sambang darah 50 dia. Tajuk 30 Polybag
35 Siklok Polybag
36 Wali songo daun kecil (Scheffera sp) 50 1 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
37 Soka bangkok (Ixora sp) 20 1 btg/pot Polybag
38 Soka jepang bunga orange (Ixora sp) 20 1 btg/pot Polybag
39 Soka philipina (Ixora sp) 20 1 btg/pot Polybag
40 Soka siantan (Ixora tricia) 20 1 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
41 Soka singapura (Ixora cocineae) bunga
putih, pink 30 1 btg/pot Polybag
42 Soka jawa/hawai (Ixora sp) 30 1 btg/pot Polybag
43 Terang bulan daun putih/kuning (Thitonia sp) 20 3 s/d 5 btg/rpn Polybag
44 Tombak raja (Yucca gloriosa) 40 3 s/d 5 btg/rpn Polybag
45 Tapak dara 10 - 15 3 s/d 5 btg/rpn Polybag
46 Pangkas Hijau 3-5 3 s/d 5 btg/rpn Polybag
47 Pangkas Hijau 20 4 s/d 7 btg/rpn Polybag
48 Bayam Merah 10 - 15 3 s/d 5 btg/rpn Polybag
49 Soka Merah 20 1 btg/pot Polybag
50 Bawang-bawangan 15-20 f5 s/d 7 btg/rpn Polybag
51 Bawang-bawangan 20-25 f5 s/d 7 btg/rpn Polybag
52 Veberia Polybag
53 Vinolia 20-30 5 s/d 10btg/rpn Polybag
54 Vinolia 10-15 2 s/d 4 btg/rpn Polybag
55 Vinolia 35-40 12sd 20 btg/rpn Polybag
56 Variegata Polybag
57 Aires Polybag
58 Ketela Merah 10 1sd 2 btg/rpn Polybag
59 Kana Presiden 15 - 20 1sd 2 btg/rpn Polybag

IV TANAMAN PAGAR
1 Kedondong laut (Nothopanax sp) 30-65 3 s/d 4 btg/rpn Polybag
2 Kedondong laut (Nothopanax sp) 60 - 75 3 s/d 4 btg/rpn Polybag
3 Kemuning (Murraya paniculata) 75 1 btg/rpn Polybag
4 Lantana pagar (Lantana camara) 30 1rpn Polybag
5 Mangkokan (Nothopanax sp) 50 3 s/d 4 btg/rpn Polybag
6 Mirten pagar (Malphigia sp) 50 3 s/d 4 btg/rpn Polybag
7 The-tehan tinggi (Durantha repens) 30 3 s/d 4 btg/rpn Polybag
8 The-tehan tinggi (Durantha repens) 50 3 s/d 4 btg/rpn Polybag
9 The-tehan tinggi (Durantha repens) 70 3 s/d 4 btg/rpn Polybag
10 Krokot 15 Polybag

V TANAMAN MERAMBAT
1 Air mata pengantin ( Antigonon leptapus) 30 dia. Tajuk 430 Polybag
2 Air mata pengantin ( Antigonon leptapus) 50 dia. Tajuk 40 Polybag
2 Alamanda (Alamanda cathartica) 30 dia. Tajuk 20 Polybag
3 Alamanda (Alamanda cathartica) 50 dia. Tajuk 40 Polybag
4 Arabidea (Arabidea sp) 40 dia. Tajuk 30 Polybag
5 Flame of irian (Orange) 40 dia. Tajuk 30 Polybag
6 Kembang kelinci (Ipomea sp) 40 dia. Tajuk 30 Polybag
7 Kembang sungsang (Gloriosa superba) 30 dia. Tajuk 20 Polybag
8 Lantana rambut ungu (Lantana sp) 20 3 s/d 4 btg/rpn Polybag
9 Pasiflora 60 dia. Tajuk 40 Polybag
10 Sirih Gading daun strip kuning (Scindapsus sp) 30 3 s/d 4 btg/rpn Polybag
11 Sthephanot bunga putih
(Sthepanothis floribunda) 30 dia. Tajuk 40 Polybag
12 Nona Makan Sirih 30 Polybag
13 Ubi rambat Kuning 30 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
VI TANAMAN HIAS
1 Anjuang hijau (Dracaena sp) 60 dia. Tajuk 40 Polybag
2 Anjuang kribo (Dracaerna sp) 60 dia. Tajuk 40 Polybag
3 Anjuang kuning (Dracaerna sp) 60 dia. Tajuk 40 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
4 Anjuang merah (Cordelyne terminalis) 40 dia. Tajuk 20 Polybag
5 Anjuang merah (Cordelyne terminalis) 60 dia. Tajuk 40 Polybag
6 Anjuang merah (Cordelyne terminalis) 80 dia. Tajuk 50 Polybag
7 Anjuang suji (Dracaena sp) 60 dia. Tajuk 40 Polybag
8 Azalea (Azalea sp) 50 dia. Tajuk 40 Polybag
9 Bakung kecil (Hymenochalys sp) 20 dia. Tajuk 40 Polybag
10 Beringin bonsai (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag
11 Beringin bonsai bentukan (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag
12 Beringin bonsai putih (Ficus benjamina) 250 dia. Tajuk 100 Polybag
13 Bonsai serut 151 - 200 dia. Tajuk 100 Polybag
14 Nusa indah merah/putih (Nussaenda sp) 50 dia. Tajuk 40 Polybag
15 Rambusa 50 Polybag
16 Pakis kelabang kuning (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag
17 Pakis krol (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag
18 Pakis monyet (Alsophila glauca) 150 - 200 dia. Tajuk 40 Polybag
19 Pisang kipas (Ravanela madagaskariensis) 200 - 250 dia. Btg 10 Polybag
20 Puring bor (Codiaeum sp) 75 dia. Tajuk 30 Polybag
21 Puring buntut (Codiaeum sp) 75 dia. Tajuk 30 Polybag
22 Puring gelatik (Codiaeum sp) 75 dia. Tajuk 30 Polybag
23 Puring jet (Codiaeum sp) 40 dia. Tajuk 20 Polybag
24 Puring jet (Codiaeum sp) 75 dia. Tajuk 30 Polybag
25 Puring ketapang (Codiaeum sp) 50 dia. Tajuk 30 Polybag
26 Puring nuri (Codiaeum sp) 60 dia. Tajuk 30 Polybag
27 Puring Kuning 20 dia. Tajuk 30 Polybag
28 Siklok dia. Btg 5 Polybag
29 Sikas/Pakis haji halus (Cycas revoluta) 80 dia. Btg 7,5 Polybag
30 Sikas diameter tajuk daun (Cycas sp) 100 dia. Btg 10 Polybag
31 Sikas medan (Cycas sp) 100 dia. Btg 10 Polybag
32 Sikas/pakis haji kasar (Cycas rumpi) 50 - 100 dia. Btg 7,5 Polybag
33 Kamboja kuning (Bali) tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag
34 Kamboja orange tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag
35 Lidah Buaya Besar 10-25 2-3 btg/pot Polybag
36 Lidah Buaya Kecil 50 5-7 btg/pot Polybag

VII PALEM
1 Kelapa gading (Cocos capitata) 200 - 250 dia. Btg 20 Phn
2 Kelapa sawit (Elais guineensis) 200 - 250 dia. Btg 40 Phn
3 Kelapa sayur (Cocos nucifera) 200 - 250 dia. btg 30 Phn
4 Kurma (Phoenix daetilifera) 100 dia. btg 30 Phn
5 Kurma (Phoenix daetilifera) >200 dia. Btg 40 Phn
6 Lontar (Borassus flabefiter) 300 dia. Btg 25 Phn
7 Palm anggur (Lalania loglgessu) 100 dia. Btg 15 Phn
8 Palm alexander 150 dia. Btg 10 Phn
9 Palm botol 150 - 200 dia. btg 30 Phn
10 Palm camedoria 100 3 s/d 5 btg/rpn Phn
11 Palm camedoria 200 3 s/d 5 btg/rpn Phn
12 Palm ekor tupai 50-75 Phn
13 Palm ekor tupai 200 dia. Btg 15 Phn
14 Palm jepang (Ptychosperma macarthurii) 100 - 150 5 s/d 7 btg/rpn Rmp
15 Palm jepang (Ptychosperma macarthurii) 150 - 250 5 s/d 7 btg/rpn Rmp
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
16 Palm kol (Licuala grandis) 100 dia. Btg 10 Phn
18 Palm kuning (Chrysalidocarpus lutescens) 50 - 100 3 s/d 5 btg/rpn Phn
19 Palm kuning (Chrysalidocarpus lutescens) 100 - 150 5 s/d 7 btg/rpn Rmp
20 Palm korembusa 50 dia. Btg 5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
21 Palm korembusa 100 dia. Btg 7 Phn
22 Palm korembusa >200 dia. Btg 10 Phn
23 Palm merah (Cyrtotachis lakka) 150 - 200 3 s/d 5 btg/rpn Phn
24 Palm merah (Cyrtotachis lakka) 300 - 350 5 s/d 7 btg/rpn Rmp
25 Palm phoeniks (Phoenix sp) 75 - 100 dia. Btg 8 Phn
26 Palm phoeniks (Phoenix sp) 150 - 200 dia. Btg 10 Phn
26 Palm putri 50 Phn
27 Palm putri 100-150 dia. Btg 10 Phn
28 Palm putri 150 - 200 dia. Btg 10 Phn
29 Palm pigni (Phoenix canariensis) 100 - 150 dia. Btg 10 Phn
30 Palm raja (Oredoxa regia) 100 - 200 dia. Btg 20 Phn
31 Palm raja (Super oredoxa regia) 200 - 300 dia. Btg 25 Phn
32 Palm ratu 100 - 150 dia. Btg 10 Phn
33 Palm sadeng (Livistonia rotundifolta) 50 dia. Btg 5 Phn
34 Palm saderi (Caroutamiti) 150 dia. Btg 8 Phn
35 Palm seledri tunggal tinggi 150 dia. Btg 8 Phn
36 Palm seledri tunggal putih 200 dia. Btg 8 Phn
37 Palm udang 50 3 s/d 5 btg/rpn Phn
38 Palm waregu (Rhapis excelsa) 150 5 s/d 7 btg/rpn Rmp
39 Pinang sirih (Areca catechu) 200 dia. Btg 10 Phn

VIII BAMBU DAN CEMARA


1 Bambu china (Bambussa vulgaris) 50 5 s/d 7 btg/rpn Dpr
2 Bambu daging (Bambussa venticossa) 150 5 s/d 7 btg/rpn Dpr
3 Bambu jepang (Phyliastachis aurea) 200 5 s/d 7 btg/rpn Dpr
4 Bambu kuning (Bambussa vulgaris) 150 5 s/d 7 btg/rpn Dpr
5 Cemara angin (Casuarina avisatifollia) 200 dia. Btg 4 Phn
6 Cemara gembel (Cupressus papuana) 150 dia. Btg 4 Phn
7 Cemara halus (Araucaria cuninghamii) 150 dia. Btg 4 Phn
8 Cemara kipas 100 - 150 dia. Btg 4 Phn
9 Cemara kuning daun emas (Cupressus sp) 150 dia. Btg 4 Phn
10 Cemara lilin 100 dia. Btg 3 Phn
11 Cemara laut (Casuarina aquasetifolia) 150 dia. Btg 4 Phn
12 Cemara natal (Cupressus sp) 75 dia.tajuk 50 Phn
13 Cemara norfolk (Araucaria sp) 75 dia.tajuk 50 Phn
14 Cemara norfolk (Araucaria sp) 100 - 150 dia.tajuk 60 Phn
15 Cemara norfolk (Araucaria sp) 400 - 500 dia.tajuk 200 Phn
16 Cemara pipa mas (Compressus sp) 75 dia.tajuk 40 Phn
17 Cemara tiang 100 - 140 dia. Btg 3 Phn
18 Pinus (Pinus merkusii) 200 dia. Btg 4 Phn
19 Pinus (Pinus merkusii) 300 dia. Btg 5 Phn

IX TANAMAN PEMIKAT BURUNG


1 Aren (Arenga catecu) 100 dia. Btg 3 Phn
2 Belimbing (Averhoa carambola) 75 dia. Btg 3 Phn
3 Bintaro 50 dia. Btg 3 Phn
4 Bintaro 100 dia. Btg 3 Phn
5 Bintaro 150 dia. Btg 4 Phn
6 Buni (Atidesmabunius) 200 - 300 dia. Btg 5 Phn
7 Buni (Atidesmabunius) 400 - 500 dia. Btg 10 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
8 Cermai 50-100 dia. Btg 5 Phn
9 Duku condet (Lansium domisticum) 100 dia. Btg 3 Phn
10 Durian (Durio zibenthinus) 150 dia. Btg 4 Phn
11 Gatet 200 - 300 dia. Btg 5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
12 Gowok (Eugenia polychephalum) 100 dia. Btg 3 Phn
13 Jambu air (Eugenia aquea) 100-150 dia. Btg 5 Phn
14 Jambu air (Eugenia aquea) 200-300 dia. Btg 10 Phn
15 Jambu bol (Eugenia malaccensis) 100 dia. Btg 3 Phn
16 Jambu mawar (Eugenia jambos) 100 dia. Btg 3 Phn
17 Kaliandra (Caliandra callothyrsus) 100 dia. Btg 3 Phn
18 Kantil (Michelia champaca) 100 dia. Btg 3 Phn
19 Kapilayu 100 dia. Btg 3 Phn
20 Kawista 200 - 300 dia. Btg 5 Phn
21 Kecapi (Sandoricum koetjape) 150 dia. Btg 4 Phn
22 Kecubung 100 dia. Btg 3 Phn
23 Kedondong (Spondias pinnata) 150 - 200 dia. Btg 4 Phn
24 Kemang (Baccaurea dulcis) 100 - 150 dia. Btg 3 Phn
25 Kenanga (Cananga odorata) 50 dia. Btg 3 Phn
26 Kepel (Stelechocarpus burahol) 100 dia. Btg 3 Phn
27 Kersen/serry 150 dia. Btg 4 Phn
28 Kesah 150 dia. Btg 4 Phn
29 Ketapang (Terminalia cattapa) 150 dia. Btg 4 Phn
30 Kelengkeng 100 dia. Btg 3 Phn
31 Kluwih 150 - 200 dia. Btg 4 Phn
32 Kosambi 100 dia. Btg 3 Phn
33 Lobi-lobi (Flacourtia inermis) 150 dia. Btg 4 Phn
34 Melinjo (Gnetum gnemon) 200 dia. Btg 4 Phn
35 Menteng (Baccaurea dulcis) 200 dia. Btg 4 Phn
36 Mindi 100 dia. Btg 3 Phn
37 Nam-nam 200 dia. Btg 5 Phn
38 Nangka (Artocarpus heterophyllus) 100 dia. Btg 3 Phn
39 Pala 200 - 300 dia. Btg 5 Phn
40 Petai 200 - 300 dia. Btg 5 Phn
41 Rambutan 50 dia. Btg 3 Phn
42 Rukem 100 dia. Btg 3 Phn
43 Sirsak 50-100 dia. Btg 5 Phn
44 Sawo kecik (Manilkara kauki) 100 dia. Btg 4 Phn
45 Sawo kecik (Manilkara kauki) 200 dia. Btg 4 Phn
46 Serikaya 50 dia. Btg 3 Phn
47 Yangliu 150 - 200 dia. Btg 4 Phn
48 Maja 200 dia. Btg 5 Phn

X BUNGA POTONG
1 Amarilis (Amarylidaceae) 1 Tangkai
2 Anggrek macan (Arrachnis sp) 1 Tangkai
3 Anyelir 1 Tangkai
4 Apple blossom 1 Tangkai
5 Aster (Asteraceae sp) 1 Tangkai
6 Anggrek Dendrobium 1 Tangkai
7 Gladiol 1 Tangkai
8 Golden shower 1 Tangkai
9 Krisan (Chrysanthemum llini) 1 Tangkai
10 Mawar 1 Tangkai
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
XI TANAMAN TEDUH (INDOOR PLANT)
1 Anggrek bulan 40 -50 3 s/d 5 btg/rpn Polybag
2 Anggrek cathalea 40 -50 3 s/d 5 btg/rpn Polybag
3 Anggrek douglas kecil 40 -50 3 s/d 5 btg/rpn Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
4 Apple blossom 30 - 40 Polybag
5 Asparagus 30 - 40 dia. Tajuk 20 Polybag
6 Begonia daun besar 40 -50 dia. Tajuk 20 Polybag
7 Begonia daun Kecil 40 -50 dia. Tajuk 20 Polybag
8 Begonia Hijau 40-50 dia. Tajuk 20 Polybag
9 Begonia perak 40 -50 dia. Tajuk 20 Polybag
10 Belanceng bintik 40 -50 4 s/d 5 dn/pot Polybag
11 Belanceng putih 40 -50 4 s/d 5 dn/pot Polybag
12 Golden shower 50 dia. Tajuk 20 Polybag
13 Gandasari 30 - 40 dia. Tajuk 15 Polybag
14 Hortensia 30 - 40 dia. Tajuk 30 Polybag
15 Kembang kancing 30 - 40 dia. Tajuk 20 Polybag
16 Kencuran 30 - 40 dia. Tajuk 20 Polybag
17 Krisdoren 30 - 40 dia. Tajuk 15 Polybag
18 Kuping gajah 30 - 40 4 s/d 5 dn/pot Polybag
19 Kuping keledai 30 - 40 4 s/d 5 dn/pot Polybag
20 Maranta macan 30 - 40 dia. Tajuk 25 Polybag
21 Maranta batik 30 - 40 dia. Tajuk 25 Polybag
22 Maranta buntut ayam 30 - 40 dia. Tajuk 25 Polybag
23 Maranta keris 30 - 40 dia. Tajuk 25 Polybag
24 Maranta sepat 30 - 40 dia. Tajuk 25 Polybag
25 Meranti bintik 40 -50 dia. Tajuk 20 Polybag
26 Meranti kol 40 -50 dia. Tajuk 20 Polybag
27 Meranti mas koki 40 -50 dia. Tajuk 20 Polybag
28 Meranti pisang 40 -50 dia. Tajuk 20 Polybag
29 Monstera 50 - 75 4 s/d 5 dn/pot Polybag
30 Mutiara 40 -50 dia. Tajuk 20 Polybag
31 Pacing 40 -50 dia. Tajuk 20 Polybag
32 Dona Carmen 40-50 Polybag
33 Sisik Naga 30-40 Polybag
34 Palesota 20-30 Polybag
35 Diefenbachia 30-40 Polybag
36 Chiangmai 20-30 Polybag
37 Chiangmai balon 20-30 Polybag
38 Pilodendron dia. Tajuk 15 Polybag
39 Sabrina ungu 20 - 30 dia. Tajuk 15 Polybag
40 Bambu China 20-30 dia. Tajuk 20 Polybag
41 Sirih Gading 40 -50 dia. Tajuk 20 Polybag
42 Sri rejeki 30 - 40 4 s/d 5 dn/pot Polybag
43 Supelir foster kasar 30 - 40 dia. Tajuk 15 Polybag
44 Supelir halus 30 - 40 dia. Tajuk 15 Polybag
45 Tanduk rusa 40 -50 dia. Tajuk 20 Polybag
46 Walisongo biasa 50 - 100 dia. Btg 2 Polybag
47 Walisongo kuning 100 - 150 dia. Btg 3 Polybag
XII POHON PENEDUH
1 Angsana (Pterocarpus indicus) 100 - 200 dia. Btg 3 Phn
2 Asem Keranji (Pithecelluobium dulce) 150 - 200 dia.Btg 2,5s/d 4 Phn
3 Asem (Tamarindus indica) 150 - 200 dia.Btg 2,5s/d 4 Phn
4 Biola cantik 10 - 25 Phn
5 Bumi 10 - 25 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
6 Batavia 100 dia. Btg 5 Phn
7 Beringin (Ficus benjamina) 150 - 200 dia.Btg 2,5s/d 4 Phn
8 Beringin (Ficus benjamina) 200 - 300 dia. Btg 4 s/d 5 Phn
9 Beringin putih 200 dia. Btg 3,5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
10 Biola cantik (Ficus pandurata) 150 - 250 dia.Btg 2,5s/d 4 Phn
11 Bisbul (Diospyros discolor) 100 - 200 dia. Btg 3 Phn
12 Bunga kupu-kupu (Bauhunia purpurea) 400 - 500 dia.Btg 8s/d 10 Phn
13 Bunga saputangan(Amherstia nobilis) 0,50-100 dia. Btg 2 Phn
14 Bunga saputangan(Amherstia nobilis) 250-300 dia. Btg 3,5 Phn
16 Bungur (Lagerstromea loudonii) 50-100 Phn
17 Bungur (Lagerstromea loudonii) 100-150 dia. Btg 3,5 Phn
18 Bungur (Lagerstromea loudonii) 150 - 250 dia. Btg 3,5 Phn
19 Cassia golden 50-100 dia. Btg 3 Phn
20 Cassia golden 150-175 dia. Btg 3 Phn
21 Cassia golden 150-200 dia. Btg 3 Phn
22 Cassia sp 200 - 300 dia. Btg 4 s/d 5 Phn
23 Cempaka kuning (Michelia champaca) 300 - 400 dia. Btg 5 s/d 8 Phn
24 Ceremai 400 - 500 dia.Btg 8 s.d 10 Phn
25 Dadap hutan (Erythrina sp) 300 - 400 dia. Btg 5 s/d 8 Phn
26 Dadap kuning (Erythrina veriegata sp) 300 - 400 dia. Btg 5 s/d 8 Phn
27 Dadap kuning (Erythrina veriegata sp) 100 - 200 dia. Btg 5 s/d 8 Phn
28 Dadap merah (Erythrina christagali 150 - 200 dia. Btg 3,5 Phn
29 Dadap merah (Erythrina christagali 300 - 400 dia. Btg 5 s/d 8 Phn
30 Sungkai 50 - 100 Phn
31 Sungkai 150 Phn
31 Damar (Agathis alba) 500 - 700 dia. Btg > 10 Phn
32 Flamboyan (Delonix regia) 150 dia. Btg 2,5 Phn
33 Gemelina 300 dia. Btg 5 Phn
34 Glauka 100 - 150 dia. Btg 3 Phn
33 Glodogan 10 - 25 Phn
34 Glodogan (Polyalthea longifolia) 100-150 dia. Btg 3,5 Phn
35 Glodogan (Polyalthea longifolia) 150 - 200 dia. Btg 3,5 Phn
36 Glodogan (Polyalthea longifolia) 200 - 300 dia. Btg 4 s/d 5 Phn
37 Glodogan tiang (Sarracca sp) 50 Phn
38 Glodogan tiang (Sarracca sp) 150 - 300 dia. Btg 4 Phn
39 Glodogan tiang (Sarracca sp) 400 - 500 dia.Btg 8 s.d 10 Phn
40 Jatimas 200 - 300 dia. Btg 4 s/d 5 Phn
41 Jakaranda (Jacaranda acutifolia) 150 - 200 dia. Btg 3,5 Phn
42 Johar (Cassia siamea) 150 dia. Btg 3 Phn
43 Kamboja putih ( Plumeria rubra) 200 - 300 dia. Btg 4 s/d 5 Phn
44 Kamboja rantai 300 - 400 dia. Btg 5 s/d 8 Phn
45 Karet kebo (Ficus elastica) 100 dia. Btg 3 Phn
46 Kasia bunga kuning (Cassia multijuga) 150 - 200 dia. Btg 3,5 Phn
47 Kastuba (Euphorbia pulcherrima) 200 - 300 dia. Btg 4 s/d 5 Phn
48 Kayu manis (Cinnamon bumanni) 200 dia. Btg 3,5 Phn
49 Kayu manis (Cinnamon bumanni) 400 - 600 dia. Btg 8s.d10 Phn
50 Kayu putih (Maleucaa leucadendron) 200 - 300 dia. Btg 4 s/d 5 Phn
51 Kembang kupu-kupu (Bauhinia pupurea) 100-150 dia. Btg 3,5 Phn
52 Kembang kupu-kupu (Bauhinia pupurea) 150 - 200 dia. Btg 3,5 Phn
53 Kembang merak (Caesalpina pulcherrima) 100-150 dia. Btg 3 Phn
54 Kembang merak (Caesalpina pulcherrima) 200 dia. Btg 3 Phn
55 Kembang sepatu kuning (Hibiscus hybridus) 100 - 200 dia. Btg 3,5 Phn
56 Kenari (Canarium commune) 100 - 150 dia. Btg 3 Phn
57 Kenari (Canarium commune) 300 - 400 dia. Btg 5 s/d 8 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
58 Ketapang (Terminalia catappa) 150 - 200 dia. Btg 3,5 Phn
59 Ketapang (Terminalia catappa) 500 - 600 dia. Btg > 10 Phn
60 Kepuh 300 - 400 dia. Btg 5 s/d 8 Phn
61 Kiara payung (Filicium decipiens) 150 - 200 dia. Btg 3,5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
62 Pucuk Merah Phn
63 Kurma 50 dia. Btg 3 Phn
64 Lampeni 150 - 200 dia. Btg 3,5 Phn
65 Mahoni (Swietania mahagoni) 20-40 dia. Btg 2 s/d 3 Phn
66 Mahoni (Swietania mahagoni) 30-50 dia. Btg 5 s/d 8 Phn
67 Mahoni (Swietania mahagoni) 50-75 dia. Btg 5 s/d 8 Phn
68 Mahoni diameter (Swietania mahagoni) 200 - 300 dia. Btg 4 s/d 5 Phn
69 Mangga (Mangifera indica) 500 - 800 dia. Btg > 10 Phn
70 Mangga Mardi Malaysia Phn
71 Sawo manila Phn
72 Jeruk Sambal calung Phn
73 Lengkeng Diamond Phn
74 Kedondong bangkok Phn
75 jambu Air bangkok Phn
76 jambu Batu Merah Phn
77 Matoa irian (Pometia pinata) 300 - 400 dia. Btg 5 s/d 8 Phn
78 Pucuk Merah 75-100 dia. Btg 5 s/d 8 Phn
79 Pule (Alsonia scholaris) 600 - 700 dia. Btg > 10 Phn
80 Salam 50 - 100 dia. Btg 3 Phn
81 Salam 10 - 25 Phn
82 Sikat botol 200 - 300 dia. Btg 4 s/d 5 Phn
83 Santorium 500 - 600 dia. Btg > 10 Phn
84 Sawo duren (Chrysophillium cainito) 150 - 200 dia. Btg 3,5 Phn
85 Sawo kecik (Chrysophillium sp) 200 dia. Btg 3,5 Phn
86 Sono keling/Sengon (Abaziafalcata) 150 - 200 dia. Btg 3,5 Phn
87 Spathodea campanulata 150 - 200 dia. Btg 3,5 Phn
88 Spathodea campanulata 500 - 600 dia. Btg > 10 Phn
89 Tabebuia 100 - 200 dia. Tajuk 50 - 70 Phn
90 Tanjung (Mimusops elengi) 10 - 25 Phn
91 Tanjung (Mimusops elengi) 60 -100 Phn
92 Tanjung (Mimusops elengi) 100-150 Phn
93 Tanjung (Mimusops elengi) 150-200 dia. Btg 3,5 Phn
94 Tanjung (Mimusops elengi) 200-250 dia. Btg 5 s/d 7 Phn
95 Tanjung (Mimusops elengi) 200 - 300 dia. Btg 4 s/d 5 Phn
96 Sirsak Madu 150 -200 dia. Btg 3,5 Phn
97 Melinjo 150 - 200 dia. Btg 3,5 Phn
98 Mahkota Dewa 150 - 200 dia. Btg 3,5 Phn
99 Trembesi (Samanea saman) 10 - 25 Phn
100 Trembesi (Samanea saman) 200 dia. Btg 3,5 Phn
101 Trembesi (Samanea saman) 400 - 500 dia. Btg 8s.d 10 Phn
102 Trembesi (Samanea saman) 600 - 700 dia. Btg > 10 Phn
103 Trenggulin (Cassia fistula) 50 - 150 dia. Btg 3 Phn
104 Walisongo (Alithurium macrolobium) 50 - 100 dia. Btg 3 Phn
104 Walisongo (Alithurium macrolobium) 200 dia. Btg 3,5 Phn
105 Walisongo (Alithurium macrolobium) 300 dia. Btg 5 Phn
106 Waru (Hibiscus tiliaceus) 500 - 600 dia. Btg > 10 Phn
107 Yangliu (Salyx babylonia) 150 - 200 dia. Btg 3,5 Phn
XIII BIJI
1 Bixa (Bixaceae sp) 1 Kg
2 Bunga kupu-kupu (Bauhunia pupurea) 1 Kg
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
3 Bungur (Largerstroemia loudonii) 1 Kg
4 Buni (Antidesma bunius) 1 Kg
5 Glodogan (Polyalthea longifolia) 1 Kg
6 Mahoni (Swietenia mahagoni) 1 Kg
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
7 Salam (Eugenia Polyanthum) 1 Kg
8 Tanjung (Mimusops elengi) 1 Kg
9 Trembesi (Samanea saman) 1 Kg

XIV TANAMAN HIAS YG MEMILIKI NILAI KHUSUS


1 Anthurium 50 Kondisi optimal Polybag
2 Belenceng yongmay 50 Kondisi optimal Polybag
3 Bonsai bentuk 75 Kondisi optimal Phn
4 Cemara dent 100 - 150 Kondisi optimal Phn
5 Cemara udang 50 - 100 Kondisi optimal Phn
6 Cemara udang 150 - 200 Kondisi optimal Phn
7 Kamboja jepang bentuk 100 - 200 Kondisi optimal Phn
8 Kapu-kapu 50 Kondisi optimal Phn
9 Krisan pot 30 - 40 Kondisi optimal Pot
10 Lotus 10 - 30 Kondisi optimal Rmp
11 Melati air 40 - 50 Kondisi optimal Rmp
12 Meranti karet 40 - 50 Kondisi optimal Rmp
13 Meranti pisang 100 Kondisi optimal Phn
14 Nolina 100 Kondisi optimal Phn
15 Pacira tinggi 150 Kondisi optimal Phn
16 Palm segitiga tinggi 150 - 200 Kondisi optimal Phn
17 Pandan bali cabang tinggi 150 - 200 Kondisi optimal Phn
18 Pandan bali tunggal tinggi 100 Kondisi optimal Phn
19 Philodendron hijau 50 Kondisi optimal Phn
20 Philodendron kuning 50 Kondisi optimal Phn
21 Philodendron merah 50 Kondisi optimal Phn
22 Puring kuning 50 Kondisi optimal Phn
23 Sikas antik tinggi 100 Kondisi optimal Phn
24 Srikit bangkok 40 - 50 Kondisi optimal Phn
25 Teratai biasa 10 - 20 Kondisi optimal Rmp
26 Tipha 50 - 100 Kondisi optimal Rmp
27 Zannia kelompok diameter 100 Kondisi optimal Phn
28 Zannia tunggal 50 Kondisi optimal Phn

WAKIL WALIKOTA PONTIANAK

TERTANDA

PARYADI, S.Hut

Untuk salinan sesuai dengan bunyi aslinya


SEKRETARIS DAERAH KOTA PONTIANAK

Ir. H. TONI HERIANTO, MT


Pembina Utama Muda
NIP. 19541129 198003 1 016
NOMOR : ………………… TAHUN 2010

TENTANG
TAR HARGA SATUAN TANAMAN HIAS
DI KOTA PONTIANAK TAHUN 2010

HARGA BAHAN

9,000
31,000
10,250
9,000
5,000

8,000
2,000
3,000
3,000
4,500
12,017
5,000
11,000
10,000
17,500
3,500
6,000
6,000
6,000
7,000
3,250
3,250
1,000
3,250
5,000
10,658
3,500
3,250
4,500
12,000
17,500
20,000
3,250
4,500
HARGA BAHAN

7,500
11,996
1,500
2,500
2,500
5,000
4,750
6,250
HARGA BAHAN

6
6,750
5,250
10,000
2,000
3,250
6,000
10,500
4,000
1,500

55,000
37,500
30,000
40,000
125,000
150,000
50,000
20,000
17,500
22,500
15,000
12,500

5,000
11,000
25,000
145,000
27,500
100,000
90,000
10,000
35,000
27,500
22,500
5,000
5,000
22,500
22,500
22,500
11,000
8,500
35,000
37,500
1,500
2,250
15,000
40,000
92,500
20,000
HARGA BAHAN

6,500
4,000
4,000
4,000
HARGA BAHAN

4,000
5,000
6,000
52,500
3,500
1,500
2,500
2,000
6,500
5,050
6,000
7,500
6,000
5,750
6,500
15,000
4,950
3,650
5,000

6,000
8,750
35,000
17,500
15,000
15,000
13,500
23,500
30,000
1,008

40,000
47,500
12,500
15,000
50,000
35,000
40,000
40,000
7,500
20,000
10,000

30,000
15,000
2,500
HARGA BAHAN

10,000
11,000
12,500
HARGA BAHAN

6
8,000
11,000
15,000
13,500
25,000
5,500
225,000
375,000
1,000,000
2,500,000
20,000
30,000
10,000
12,500
200,000
475,000
20,000
20,000
20,000
14,500
30,000
20,000
20,000
7,500
100,000
900,000
1,000,000
1,350,000
125,000
400,000
300,000
40,000
15,000

450,000
450,000
175,000
400,000
3,500,000
400,000
150,000
125,000
300,000
110,000
300,000
45,000
225,000
110,000
250,000
HARGA BAHAN

65,000
42,500
125,000
40,000
HARGA BAHAN

6
60,000
70,000
110,000
325,000
175,000
375,000
45,000
140,000
300,000
8,000,000
150,000
425,000
80,000
62,500
70,000
150,000
400,000
35,000
50,000
250,000

45,000
75,000
67,500
235,000
200,000
50,000
75,000
150,000
550,000
52,500
150,000
62,500
62,500
150,000
1,250,000
75,000
77,500
275,000
400,000

275,000
57,500
20,000
40,000
70,000
80,000
250,000
HARGA BAHAN

35,000
75,000
175,000
90,000
HARGA BAHAN

6
40,000
61,750
300,000
175,000
50,000
40,000
65,000
44,000
99,000
341,000
77,000
165,000
33,000
52,250
38,500
132,000
88,000
137,500
164,340
27,500
16,500
38,500
110,000
99,000
38,500
93,500
121,000
170,500
165,000
22,000
33,000
38,500
66,000
220,000
66,000
165,000
99,000

17,875
275,000
13,750
11,000
15,125
68,750
13,750
55,000
16,500
5,500
HARGA BAHAN

110,000
82,500
25,850
HARGA BAHAN

6
55,000
22,000
24,750
24,750
24,750
23,100
165,000
22,000
44,000
22,000
33,000
11,000
11,000
16,500
38,500
49,500
24,750
22,000
27,500
22,000
22,000
22,000
22,000
22,000
22,000
11,000
5,500
5,500
41,250
55,000
60,500
82,500
44,000
96,750
8,250
5,500
16,500
16,500
22,000
27,500
27,500
44,000
44,000
137,500

100,100
324,500
143,000
35,750
10,100
HARGA BAHAN

71,500
393,250
572,000
1,430,000
HARGA BAHAN

6
286,000
28,600
429,000
154,200
171,600
71,500
180,753
214,500
57,475
57,600
78,650
85,800
128,700
321,750
250,250
286,000
143,000
250,250
572,000
67,100
357,500
643,500
143,000
128,700
50,050
7,150
151,250
178,750
286,000
14,300
178,750
321,750
286,000
50,050
107,250
286,000
1,144,000
35,750
171,600
357,500
100,100
193,050
85,800
121,000
181,500
90,750
181,500
214,500
71,500
171,600
HARGA BAHAN

321,750
643,500
100,100
143,000
HARGA BAHAN

6
80,000
214,500
78,650
101,875
121,000
143,000
214,500
2,145,000
178,750
178,750
28,600
89,375
117,975
107,250
46,475
1,101,100
137,500
572,000
71,500
42,900
357,500
572,000
250,250
357,500
85,800
57,200
643,500
15,250
17,875
66,000
79,860
95,835
181,500
286,000
89,375
121,550
143,000
58,650
135,850
217,950
500,500
42,900
107,250
321,750
500,500
500,500
214,500

44,000
33,000
HARGA BAHAN

22,000
44,000
44,000
11,000
HARGA BAHAN

6
22,000
16,500
33,000

247,500
55,000
1,100,000
1,237,500
1,045,000
2,475,000
1,375,000
38,500
38,500
143,000
44,000
44,000
44,000
165,000
330,000
495,000
495,000
176,000
22,000
55,000
220,000
13,750
1,320,000
66,000
46,750
88,000
137,500
121,000

WAKIL WALIKOTA PONTIANAK

TERTANDA

PARYADI, S.Hut

Untuk salinan sesuai dengan bunyi aslinya


SEKRETARIS DAERAH KOTA PONTIANAK

Ir. H. TONI HERIANTO, MT


Pembina Utama Muda
NIP. 19541129 198003 1 016

Anda mungkin juga menyukai