NOMOR : …………………... T
TENTANG
STANDARISASI HARGA SATUAN BAHAN, UPAH DAN ANALI
BIAYA PEKERJAAN YANG TERDIRI DARI ANALISA E DAN ANA
BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN (ABK-SNI) K
TAHUN ANGGARAN 2010
HARGA
TANPA
NO TENAGA KERJA SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
A. UPAH
1 Mandor Lapangan Org/hari L.061 60,500.00
2 Mekanik Org/hari L.071 60,500.00
3 Kepala Tukang Org/hari L.073 60,500.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 55,000.00
5 Operator terlatih Org/hari L.081 49,500.00
6 Operator semi terlatih Org/hari L.082 44,000.00
7 Sopir Org/hari L.091 49,500.00
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 44,000.00
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 49,500.00
NO MATERIAL SATUAN
B. BAHAN PENGISI
1 Batu Kong M³
2 Batu Sap Pinang M³
3 Batu pecah 15-20 cm M³
4 Batu pecah 10-15 cm M³
5 Batu pecah 5-7 cm M³
6 Batu pecah 3-5 cm M³
NO MATERIAL SATUAN
49 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg
50 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg
51 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg
52 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg
53 Papan Turap Uk. 15/50 - 5m Kpg
54 Papan Turap Uk. 15/50 - 6m Kpg
55 Pemancangan Mini Pile - 6m Btg
56 Sewa Pompa Ready Mix (Min. 100 M³) M³
57 Bahan Plastik Cor Beton M²
NO MATERIAL SATUAN
C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³
4 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³
5 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³
6 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³
7 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³
8 Ky. Belian ketam Uk. 6/6 - 4 M M³
9 Ky. Belian ketam Uk. 7/7 - 4 M M³
10 Ky. Belian ketam Uk. 8/8 - 4 M M³
11 Ky. Belian ketam Uk. 5/10 - 4 M M³
12 Ky. Belian ketam Uk. 4/8 - 4 M M³
13 Papan belian ketam (4m) M³
14 Papan belian tdk ketam (4m) M³
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³
16 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³
17 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³
20 Kusen Ky Kelas I Bangkirai uk. 5/10 M³
21 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³
22 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³
23 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³
24 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³
25 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³
26 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³
27 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³
28 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³
29 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³
30 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³
31 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³
32 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³
33 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³
34 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³
35 Papan kayu klas II (mabang) tdk ketam M³
36 Papan kayu klas II (mabang) ketam M³
37 Papan kayu klas I tdk ketam M³
38 Papan kayu klas I ketam M³
39 Papan mal klas III M³
40 Papan Simpiran M³
NO MATERIAL SATUAN
D. BAHAN CAT
1 Amplas Lbr
2 Minyak cat Kg
3 Cat kilat Kg
4 Plamur Kg
5 Cat dasar Kg
6 Cat tembok Kg
7 Cat tembok type weather shield Kg
8 Cat tembok type weather coat (acrylic) Kg
9 Cat seng Kg
10 Dempul Kg
11 Plitur Kg
12 Thiner Ltr
13 Thiner ND Ltr
14 Melamic Ltr
15 Vernis Ltr
16 Meni Kg
17 Oker Kg
18 Lem Kayu Kg
19 Sealent Tube
20 Soda Api Kg
21 Sabun / cream pembersih kotoran Kg
22 Teak Oil Ltr
23 Ter / Residu Ltr
24 Kuas 4" Bh
25 Road Line Paint ( Cat Marka ) Ltr
26 Glass Bit Kg
27 Weatherbond Emulsion ( cat kerb ) Kg
28 Termoplast Kg
3 Kawat baja/bendrat Kg
4 Simpai roll Kg
5 Kawat simpai Kg
6 Baut dia 4/8 " pj = 20 cm Btg
7 Besi Penahan bh
8 Beugel plat L. 3 cm bh
9 Plat 1,2 x 2,4 x 12 Bh
10 Besi Konstruksi (I, H) Kg
11 Besi Konstruksi ( C ) Kg
12 Besi Konstruksi (siku ) Kg
13 Kawat Las Btg
NO MATERIAL SATUAN
14 Kawat Las Kg
15 Kawat harmonika M²
16 Kawat kasa M²
17 Pipa galvanis dia 3/4" Btg
18 Pipa galvanis dia 1/2" Btg
19 Pipa galvanis dia 1" Btg
20 Pipa galvanis dia 1 1/4" Btg
21 Pipa galvanis dia 1 1/2" Btg
22 Pipa galvanis dia 2" Btg
23 Pipa galvanis dia 3" Btg
24 Pipa galvanis dia 4" Btg
25 Folding gate M²
26 Rangka Aluminium 1 1/2" x 3" Meter
27 Rangka Aluminium 1 3/4" x 4" Meter
28 Pintu Aluminium std IKP, lengkap 4" Unit
29 Rangka Baja Ringan Zincalume (truss/color) + Pemasangan M²
30 Rangka Baja Ringan Zincalume (truss/polos) + Pemasangan M²
31 Alumatek Unit
F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC Bh
2 Kait angin Bh
3 Handle Jendela Bh
4 Handle Pintu Bh
5 Engsel jendela Bh
6 Engsel pintu Bh
7 Slot pintu Bh
8 Slot jendela Bh
9 Kunci tanam 2 slag (setaraf Belluci) Bh
10 Kunci tanam 1 slag Bh
11 Kunci tanam antik Bh
12 Kunci tanam biasa Bh
13 Kunci silinder Bh
14 Door Closer Bh
15 Door Stoper Bh
16 Paku Seng Kg
17 Paku campuran 1" - 5 " Kg
18 Paku beton Kg
19 Paku Atap Seng Kg
20 Paku triplek Kg
21 Paku GRC Kg
22 Paku Zincallume Kg
NO MATERIAL SATUAN
23 Sekrup Gypsum Kg
24 Sekrup Fixer Bh
25 Engsel Angin Bh
G. BAHAN ATAP
1 Sirap belian Lbr
2 Asbes Lbr
3 Eternit M²
4 Genteng Metal Type Prima 0.35 Lbr
5 Genteng Metal Type Royal 0.35 Lbr
6 Genteng Metal Type Classic 0.35 Lbr
7 Genteng Metal Stone ( Type Classic 0.35 ) Lbr
8 Genteng Metal Stone ( Type Prima 0.35 ) Lbr
9 Atap Metal Supersheet 0.35 (polos) M'
10 Atap Metal Supersheet 0.35 (polos) M²
11 Atap Trim Deck 0.3 (polos) M²
12 Atap Trim Deck 0.33 (color) M²
13 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh
14 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh
15 Nok bubungan genteng metal kotak 0.35 M'
16 Nok bubungan genteng metal stone kotak 0.35 M'
17 Nok bubungan Trim Deck (polos) M'
18 Nok bubungan Trim Deck (color) M'
19 Seng Gelombang Bjls 30 Lbr
20 Seng Gelombang Bjls 20 Lbr
21 Seng Plat Bjls 20 Lbr
22 Seng Plat Bjls 30 Lbr
23 Seng Plat Bjls 30 (lebar 45 cm) M'
24 Plat Datar Color 0.35 Lbr
25 Zincalume Gelombang Persegi 0.35 (polos) M²
26 Zincalume Gelombang Persegi 0.30 (polos) M²
27 Zincalume Gelombang Persegi 0.35 (color) M²
28 Zincalume Gelombang Persegi 0.30 (color) M²
29 Zincalume Plat 0.2 Lbr
30 Aluminium Foil M²
H. BAHAN KACA
1 Kaca Polos, t = 5 mm M²
2 Kaca Polos, t = 12mm M²
3 Kaca Rayben, t = 5 mm M²
4 Kaca Cermin t = 3mm M²
5 Kaca Patri M²
NO MATERIAL SATUAN
6 Sealent Kg
7 Nako + Bingkai (80 x 15) x 10 daun polos Bh
8 Nako + Bingkai (80 x 15) x 10 daun rayben Bh
9 Kaca Es M²
I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr
2 Triplek t = 6 mm Lbr
3 Triplek t =9 mm Lbr
4 Multiplek t = 10 mm Lbr
5 Multiplek t = 12 mm Lbr
NO MATERIAL SATUAN
J. BAHAN SANITASI
1 Kloset duduk monoblok Bh
2 Kloset duduk putih (setaraf TOTO) Bh
3 Kloset duduk warna (setaraf TOTO) Bh
4 Kloset jongkok (setaraf TOTO) Bh
5 Kloset jongkok (setaraf INA) Bh
6 Kran air uk 1/2" Bh
7 Pipa paralon dia 1/2" Btg
8 Pipa paralon dia 3/4" Btg
9 Pipa paralon dia 1" Btg
10 Pipa paralon dia 2" Btg
11 Pipa paralon dia 3" Btg
12 Pipa paralon dia 4" Btg
WAKIL WALIKOTA
NO MATERIAL SATUAN
TENTANG
SATUAN BAHAN, UPAH DAN ANALISA
TERDIRI DARI ANALISA E DAN ANALISA
UNG DAN PERUMAHAN (ABK-SNI) KOTA PONTIANAK
UN ANGGARAN 2010
HARGA
HARGA TERMASUK
KEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD)
(Rp) (Rp)
6,050.00 66,550.00
6,050.00 66,550.00
6,050.00 66,550.00
5,500.00 60,500.00
4,950.00 54,450.00
4,400.00 48,400.00
4,950.00 54,450.00
4,400.00 48,400.00
4,950.00 54,450.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
M.101 192,500.00
- 215,050.00
- 230,230.00
M.020 246,070.00
M.022 271,060.00
M.023 290,700.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
M.024 327,030.00
M.025 373,580.00
- 394,900.00
M.026 394,900.00
- 371,360.00
- 9,900.00
M.040 58,370.00
M.080 70,400.00
- 1,400.00
M.050.a 115,060.00
M.050 220,000.00
- 2,200.00
- 3,630.00
- 2,530.00
- 990.00
- 2,530.00
- 2,310.00
- 3,300.00
- 26,400.00
- 50,120.00
- 40,030.00
- 54,450.00
- 64,130.00
- 71,390.00
- 96,250.00
- 98,450.00
- 277,200.00
- 189,420.00
- 453,750.00
- 275,000.00
- 242,000.00
- 46,750.00
- 50,380.00
- 54,890.00
- 8,250.00
- 792,000.00
- 830,500.00
- 880,000.00
- 1,017,500.00
- 1,094,500.00
- 44,000.00
- 11,550.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 1,155,000.00
- 1,485,000.00
- 990,000.00
- 1,105,500.00
- 880,000.00
- 1,122,000.00
- 138,050.00
- 55,000.00
- 3,850.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 9,736,320.00
- 11,463,540.00
- 9,063,230.00
M.181.a 9,350,550.00
M.181.b 7,903,940.00
- 8,116,350.00
- 7,370,770.00
- 8,934,750.00
- 11,892,210.00
- 10,771,200.00
- 10,771,200.00
- 9,453,120.00
M.181.e 16,958,370.00
M.181.d 15,074,070.00
M.181.f 6,660,170.00
M.181.g 11,297,220.00
- 4,630,120.00
- 6,033,170.00
- 11,550,000.00
- 82,500.00
M.181.h 2,194,720.00
M.181.i 3,293,620.00
- 3,724,160.00
- 3,168,550.00
- 2,764,960.00
- 1,883,750.00
- 3,053,270.00
- 3,244,010.00
- 3,949,990.00
- 4,109,820.00
- 2,520,870.00
- 4,947,360.00
- 962,500.00
- 2,046,110.00
M.181.j 4,541,790.00
M.181.k 6,331,160.00
- 9,052,120.00
- 7,562,500.00
M.181.l 1,323,520.00
- 604,780.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 19,360.00
- 20,680.00
- 5,630.00
- 10,450.00
- 66,000.00
- 82,500.00
- 181,500.00
- 16,500.00
- 2,310.00
- 27,940.00
- 42,130.00
- 29,480.00
- 33,000.00
- 36,520.00
- 40,260.00
- 80,080.00
- 42,900.00
- 27,940.00
- 39,160.00
M.090.f 22,990.00
- 32,450.00
- 56,540.00
- 30,910.00
- 44,220.00
- 55,820.00
- 20,400.00
- 137,500.00
- 11,660.00
- 20,350.00
- 44,000.00
- 25,300.00
- 17,710.00
M.090.e 49,500.00
M.090.g 36,520.00
M.090.h 79,200.00
- 34,100.00
M.167 15,510.00
- 17,710.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
M.168 18,700.00
- 20,900.00
- 26,620.00
M.163 8,250.00
- 11,550.00
- 38,500.00
- 445,500.00
- 17,930.00
- 18,590.00
- 18,590.00
- 5,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 110,000.00
- 27,500.00
- 13,750.00
- 148,610.00
- 121,880.00
- 191,510.00
- 269,830.00
- 312,730.00
- 384,450.00
- 614,350.00
- 437,580.00
- 550,000.00
- 82,500.00
- 105,600.00
- 2,392,500.00
- 253,000.00
- 165,000.00
- 2,090,000.00
- 302,500.00
- 14,850.00
- 16,500.00
- 110,000.00
- 24,750.00
- 33,000.00
- 20,350.00
- 11,550.00
- 184,250.00
- 118,250.00
- 179,020.00
- 86,900.00
- 107,250.00
- 123,750.00
- 22,000.00
M.166.a 24,530.00
M.166.b 20,900.00
- 27,500.00
M.166.c 27,500.00
- 28,870.00
- 28,870.00
- 38,500.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 66,000.00
- 330.00
- 11,000.00
- 5,500.00
- 55,000.00
- 71,500.00
- 69,630.00
- 69,630.00
- 67,320.00
- 88,880.00
- 88,880.00
- 93,500.00
- 116,930.00
- 104,530.00
- 117,420.00
- 71,500.00
- 88,000.00
- 85,360.00
- 101,200.00
- 114,400.00
- 128,700.00
- 71,390.00
- 51,370.00
- 52,800.00
- 71,500.00
- 20,900.00
- 60,500.00
- 114,120.00
- 100,370.00
- 127,870.00
- 114,120.00
- 130,900.00
- 55,000.00
- 109,450.00
- 422,400.00
- 146,300.00
- 156,750.00
- 1,045,000.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 111,650.00
- 214,500.00
- 225,500.00
- 167,200.00
- 60,500.00
- 133,100.00
- 165,000.00
- 187,000.00
- 222,200.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 109,340.00
- 64,900.00
- 67,100.00
- 1,705,000.00
- 2,145,000.00
- 2,343,000.00
- 204,600.00
- 137,500.00
- 38,500.00
- 17,820.00
- 27,670.00
- 40,700.00
- 61,820.00
- 117,150.00
- 154,000.00
M.183 4,500.00
- 5,750.00
M.184 5,600.00
M.185 24,200.00
- 42,400.00
M.064 5,100.00
- 6,100.00
- 8,300.00
M.170 57,000.00
- 62,500.00
- 150,000.00
- 63,300.00
13,167,000.00
- 5,458,530.00
- 3,724,980.00
- 5,105,100.00
- 4,274,980.00
- 4,939,000.00
- 544,500.00
- 6,675,900.00
- 5,563,250.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 3,599,750.00
- 7,754,900.00
- 6,805,880.00
- 7,237,010.00
- 7,601,000.00
- 67,217,150.00
- 80,659,700.00
- 10,838,520.00
- 12,362,130.00
- 10,838,300.00
- 11,388,300.00
- 983,010.00
- 982,980.00
- 915,200.00
- 682,000.00
- 517,000.00
- 4,664,000.00
- 3,376,170.00
- 797,500.00
- 249,700.00
- 202,030.00
- 124,850.00
- 842,870.00
- 842,870.00
- 459,430.00
- 374,360.00
- 248,320.00
- 144,550.00
- 409,290.00
- 280,950.00
- 248,320.00
- 148,220.00
- 270,500.00
- 19,610.00
- 16,360.00
- 14,390.00
- 202,950.00
- 148,310.00
- 70,210.00
- 485,550.00
- 485,550.00
- 70,210.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 742,500.00
- 336,600.00
- 324,500.00
- 248,320.00
- 168,520.00
- 280,950.00
- 280,950.00
- 248,320.00
- 140,430.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 336,600.00
- 324,610.00
- 55,450.00
- 55,450.00
- 41,620.00
- 2,100.00
- 3,480.00
- 3,480.00
- 3,480.00
- 4,950.00
- 4,950.00
- 3,940.00
- 6,230.00
- 13,840.00
- 13,100.00
- 9,070.00
- 5,220.00
- 538,080.00
- 131,810.00
- 41,610.00
- 34,650.00
- 137,500.00
- 34,650.00
- 5,500.00
- 6,230.00
- 34,650.00
- 34,650.00
- 27,770.00
- 70,210.00
- 148,220.00
- 83,230.00
- 20,800.00
- 22,180.00
- 31,900.00
- 37,490.00
- 38,860.00
- 51,330.00
- 34,650.00
- 115,500.00
- 44,990.00
- 58,190.00
- 27,680.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 33,360.00
- 51,970.00
- 137,500.00
- 40,240.00
- 79,100.00
- 90,100.00
- 2,970.00
- 4,620.00
- 7,260.00
- 11,220.00
- 6,140.00
- 12,210.00
- 17,500.00
- 16,610.00
- 21,900.00
- 23,740.00
- 23,430.00
- 34,650.00
- 56,260.00
- 76,560.00
- 65,900.00
- 273,350.00
- 305,250.00
- 374,550.00
- 134,560.00
- 86,680.00
- 127,930.00
- 6,500.00
- 5,950.00
- 7,880.00
- 2,970.00
- 4,620.00
- 7,260.00
- 11,220.00
- 12,210.00
- 17,600.00
- 12,280.00
- 22,820.00
- 1,370.00
- 3,570.00
- 8,700.00
- 2,380.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 60,500.00
- 88,270.00
- 122,100.00
- 155,370.00
- 199,740.00
- 271,970.00
- 3,570.00
- 19,700.00
- 5,950.00
- 14,660.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 10,170.00
- 4,400.00
- 5,500.00
- 7,880.00
- 27,680.00
- 10,080.00
- 25,480.00
- 3,110.00
- 5,310.00
- 929,500.00
- 551,320.00
- 449,240.00
- 173,470.00
- 55,450.00
- 27,680.00
- 55,450.00
- 180,300.00
- 7,880.00
- 34,650.00
- 2,010.00
- 2,750.00
- 1,650.00
- 7,090.00
- 9,900.00
- 8,250.00
- 4,120.00
- 55,450.00
- 1,106,050.00
- 7,970.00
- 6,960.00
- 34,650.00
- 1,460.00
- 3,480.00
- 27,770.00
- 17,440.00
- 17,440.00
- 22,110.00
- 27,770.00
- 12,500.00
- 69,390.00
- 69,390.00
- 4,950.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 99,880.00
- 83,230.00
- 55,500.00
- 130,160.00
- 320.00
- 156,200.00
- 27,500.00
- 44,000.00
- 97,070.00
- 97,070.00
- 4,190.00
- 11,130.00
- 840.00
- 13,880.00
- 13,880.00
- 13,880.00
- 124,850.00
- 52,700.00
- 52,700.00
- 235,620.00
- 68,000.00
- 34,650.00
- 34,650.00
- 13,880.00
- 34,650.00
- 34,650.00
- 3,480.00
- 62,420.00
- 911,620.00
- 499,490.00
- 1,327,260.00
- 25,000.00
- 48,560.00
- 48,560.00
- 19,610.00
- 19,610.00
- 2,090.00
- 6,270.00
- 52,020.00
- 124,850.00
- 229,070.00
- 7,650.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 2,090.00
- 9,020.00
- 8,340.00
- 16,680.00
- 43,490.00
- 149,990.00
- 83,230.00
- 97,120.00
- 438,530.00
- 569,430.00
- 1,145,370.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 1,276,270.00
- 1,439,900.00
- 2,810.00
- 13,840.00
- 20,800.00
- 4,900.00
- 6,280.00
- 4,300.00
- 16,680.00
- 55,450.00
- 9,020.00
- 305,250.00
- 20,800.00
- 124,850.00
- 4,190.00
- 8,340.00
- 9,710.00
- 2,810.00
- 980.00
- 1,300.00
- 1,440.00
- 3,850.00
- 4,950.00
- 2,810.00
- 4,190.00
- 8,370.00
- 980.00
- 2,810.00
- 124,880.00
- 52,750.00
- 34,680.00
- 710.00
- 20,800.00
- 901,900.00
- 27,750.00
- 27,750.00
- 27,750.00
- 27,750.00
- 277,500.00
- 592,180.00
- 457,870.00
- 10,690.00
- 17,440.00
- 6,920.00
- 20,800.00
HARGA TERMASUK
KODE KEUNTUNGAN
(OVERHEAD)
(Rp)
- 34,690.00
- 62,420.00
- 4,190.00
- 6,420.00
- 34,690.00
- 192,500.00
- 630,850.00
- 7,150,000.00
- 55,000.00
- 6,050,000.00
- 550,000.00
- 366,850.00
- 8,800,000.00
- 66,000.00
- 2,750,000.00
- 165,000.00
- 330,000.00
- 49,500.00
- 4,950,000.00
- 5,500,000.00
- 5,390,000.00
- 8,250,000.00
- 8,800,000.00
- 3,025,000.00
- 3,245,000.00
- 10,560,000.00
- 9,680,000.00
- 17,875,000.00
- 91,208,370.00
- 5,225,000.00
- 733,330.00
- 1,100,000.00
- 11,000,000.00
- 17,416,660.00
- 38,700,470.00
- 5,500,000.00
- 9,533,330.00
TERTANDA
PARYADI, S.Hut
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.500 #REF!
2 Tukang L.02 OH 0.750 #REF!
3 Kepala Tukang L.03 OH 0.075 #REF!
4 Mandor L.04 OH 0.075 #REF!
JUMLAH TENAGA KERJA
B BAHAN
1 Batu Belah m³ 1.200 #REF!
2 Semen Portland Kg 202.000 #REF!
3 Pasir Pasang m³ 0.485 #REF!
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
REKAPITULASI BIAYA PEKERJAAN
KEGIATAN :
PEKERJAAN :
SUB PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
1 2 3
A PEKERJAAN PENDAHULUAN 60,135,238.50
C PEKERJAAN STRUKTUR
I Sloof Uk. 35x60 cm 10,730,626.80
II Err:509 Err:509
III Err:509 Err:509
IV Err:509 101,646,235.07
D Err:509 Err:509
JUMLAH TOTAL
PPN 10 %
JUMLAH TOTAL + PPN 10 %
ASI BIAYA PEKERJAAN
JUMLAH SUB
TOTAL
60,135,238.50
1,178,627,165.04
Err:509
Err:509
Err:509
Err:509
Err:509
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
KEGIATAN :
PEKERJAAN :
SUB PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
KODE
NO URAIAN PEKERJAAN VOLUME SAT ANALISA
1 2 3 4 5
A. PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank 138.000 M' 2.2.1.4.a
2 Pembongkaran 1.000 Lsm
3 Pagar Sementara 118.500 M'
Sub Total A
B. PEKERJAAN PONDASI
1 Pengadaan Mini Pile 20 x 20 528.000 Btg
2 Pemancangan Mini Pile 20 x 20 528.000 Btg
3 Pembobokan 176.000 Titik
4 Galian Tanah Pondasi 66.413 M³ 2.3.1.1
5 Urugan Pasir t = 15 cm 6.316 M³ 2.3.1.11
6 Lantai Kerja t = 5 cm 3.248 M³ 4.1.1.4
7 Poer Type P1
- Beton Ready Mix K-300 3.240 M³ B.13.i.2
- Tulangan U32 411.840 Kg 4.1.1.17.b
- Bekisting Pondasi 21.600 M² 4.1.1.20.a
8 Poer Type P2
- Beton Ready Mix K-300 0.864 M³ B.13.i.2
- Tulangan U32 93.184 Kg 4.1.1.17.b
- Bekisting Pondasi 4.320 M² 4.1.1.20.a
9 Poer Type P3
- Beton Ready Mix K-300 8.748 M³ B.13.i.2
- Tulangan U32 570.024 Kg 4.1.1.17.b
- Bekisting Pondasi 19.440 M² 4.1.1.20.a
10 Poer Type P4
- Beton Ready Mix K-300 6.048 M³ B.13.i.2
- Tulangan U32 529.984 Kg 4.1.1.17.b
- Bekisting Pondasi 20.160 M² 4.1.1.20.a
11 Poer Type P5
- Beton Ready Mix K-300 21.446 M³ B.13.i.2
- Tulangan U32 1,775.072 Kg 4.1.1.17.b
- Bekisting Pondasi 59.160 M² 4.1.1.20.a
12 Kolom Pondasi Uk. 35/35 cm
- Beton K-225 3.026 M³ 4.1.1.7.a
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA
1 2 3 4 5
- Tulangan U32 763.648 Kg 4.1.1.17.b
- Tulangan U24 36.024 Kg 4.1.1.17.a
- Bekisting Pondasi 20.368 M² 4.1.1.20.a
13 Kolom Pondasi Uk. 35/75 cm
- Beton K-225 0.171 M³ 4.1.1.7.a
- Tulangan U32 35.168 Kg 4.1.1.17.b
- Tulangan U24 1.580 Kg 4.1.1.17.a
- Bekisting Pondasi 0.980 M² 4.1.1.20.a
Sub Total B
C PEKERJAAN STRUKTUR
I ELEVASI -0,75 M
1 Sloof Uk. 25/55 cm
- Beton K-225 0.928 M³ 4.1.1.7.a
- Tulangan U32 177.600 Kg 4.1.1.17.b
- Tulangan U24 32.074 Kg 4.1.1.17.a
- Bekisting Sloof 9.488 M² 4.1.1.21.b
2 Sloof Uk. 20/40 cm
- Beton K-225 0.800 M³ 4.1.1.7.a
- Tulangan U32 92.238 Kg 4.1.1.17.b
- Tulangan U24 28.045 Kg 4.1.1.17.a
- Bekisting Sloof 10.000 M² 4.1.1.21.b
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA
1 2 3 4 5
II ELEVASI + 0,00 M
1 Sloof Uk. 25/55 cm
- Beton K-225 36.110 M³ 4.1.1.7.a
- Tulangan U32 6,073.920 Kg 4.1.1.17.b
- Tulangan U24 1,269.688 Kg 4.1.1.17.a
- Bekisting Sloof 369.121 M² 4.1.1.21.b
2 Sloof Uk. 20/45 cm
- Beton K-225 12.611 M³ 4.1.1.7.a
- Tulangan U32 1,808.640 Kg 4.1.1.17.b
- Tulangan U24 533.566 Kg 4.1.1.17.a
- Bekisting Sloof 162.135 M² 4.1.1.21.b
3 Sloof Uk. 20/40 cm
- Beton K-225 2.586 M³ 4.1.1.7.a
- Tulangan U32 355.213 Kg 4.1.1.17.b
- Tulangan U24 116.130 Kg 4.1.1.17.a
- Bekisting Sloof 34.480 M² 4.1.1.21.b
4 Sloof Uk. 15/30 cm
- Beton K-225 0.258 M³ 4.1.1.7.a
- Tulangan U32 40.102 Kg 4.1.1.17.b
- Tulangan U24 16.590 Kg 4.1.1.17.a
- Bekisting Sloof 4.725 M² 4.1.1.21.b
5 Tutup Kolong Uk. 10/30 cm
- Beton Ready Mix K-225 1.972 M³ 4.1.1.7.a
- Wiremesh M6 54.999 Kg 4.1.1.19
- Bekisting Sloof 39.430 M² 4.1.1.21.b
6 Plat Lantai t = 10 cm
- Beton Ready Mix K-225 79.918 M³ 4.1.1.7.a
- Wiremesh 4,293.601 Kg 4.1.1.19
- Urugan Pasir t = 65 cm Err:509 M² 2.3.1.11
7 Kolom Beton Bertulang Type K1 Uk. 35/35 cm
- Beton K-225 23.410 M³ 4.1.1.7.a
- Tulangan U32 2,461.760 Kg 4.1.1.17.b
- Tulangan U24 97.720 Kg 4.1.1.17.a
- Bekisting Kolom Berulang 250.633 M² 4.1.1.22.b
8 Kolom Beton Bertulang Type K1 Uk. 35/75 cm
- Beton K-225 1.024 M³ 4.1.1.7.a
- Tulangan U32 101.108 Kg 4.1.1.17.b
- Tulangan U24 18.960 Kg 4.1.1.17.a
- Bekisting Kolom 8.130 M² 4.1.1.22.a
10 Kolom Praktis Uk. 9/9 cm
- Beton K-175 3.323 M³ 4.1.1.5.a
- Tulangan U24 1,126.540 Kg 4.1.1.17.a
- Bekisting Sloof Berulang 93.465 M² 4.1.1.21.c
11 Balok Praktis Uk. 9/9 cm
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA
1 2 3 4 5
- Beton K-175 2.659 M³ 4.1.1.5.a
- Tulangan U24 901.232 Kg 4.1.1.17.a
- Bekisting Sloof 74.772 M² 4.1.1.21.b
12 Tangga Type 1
a. Galian Tanah 1.800 M³ 2.3.1.1
b. Urugan Pasir 0.360 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm + Pemancangan 30.000 Btg
d.Pondasi
- Beton K-225 0.738 M³ 4.1.1.7.a
- Tulangan U24 28.470 Kg 4.1.1.17.a
- Bekisting Sloof 4.800 M² 4.1.1.21.b
e.Tapak Tangga
- Beton K-225 1.332 M³ 4.1.1.7.a
- Tulangan U24 227.840 Kg 4.1.1.17.a
- Wiremesh M6 11.052 Kg 4.1.1.19
- Bekisting Sloof 10.200 M² 4.1.1.21.b
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA
1 2 3 4 5
12 Tangga Type 2
a. Galian Tanah 2.400 M³ 2.3.1.1
b. Urugan Pasir 0.480 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm + Pemancangan 40.000 Btg
d.Pondasi
- Beton K-225 0.984 M³ 4.1.1.7.a
- Tulangan U24 49.662 Kg 4.1.1.17.a
- Bekisting Sloof 6.400 M² 4.1.1.21.b
e.PlatTangga
- Beton K-225 1.776 M³ 4.1.1.7.a
- Tulangan U24 302.511 Kg 4.1.1.17.a
- Wiremesh M6 14.736 Kg 4.1.1.19
- Bekisting Sloof 13.600 M² 4.1.1.21.b
13 Tangga Type 3
a. Kolom Beton Bertulang Type KT Uk. 20/20 cm
- Beton K-225 0.080 M³ 4.1.1.7.a
- Tulangan U32 12.560 Kg 4.1.1.17.b
- Tulangan U24 2.607 Kg 4.1.1.17.a
- Bekisting Kolom 1.555 M² 4.1.1.22.a
b. Balok Bordes Uk. 15/30 cm
- Beton K-225 0.123 M³ 4.1.1.7.a
- Tulangan U32 12.480 Kg 4.1.1.17.b
- Tulangan U24 5.254 Kg 4.1.1.17.a
- Bekisting Balok 2.044 M² 4.1.1.23.b
c.Tangga
- Beton K-225 1.919 M³ 4.1.1.7.a
- Tulangan U24 186.900 Kg 4.1.1.17.b
- Wiremesh M6 63.319 Kg 4.1.1.19
- Bekisting Balok 11.400 M² 4.1.1.23.b
13 Tangga Type 4
a. Kolom Beton Bertulang Type KT Uk. 20/20 cm
- Beton K-225 0.080 M³ 4.1.1.7.a
- Tulangan U32 12.560 Kg 4.1.1.17.b
- Tulangan U24 2.607 Kg 4.1.1.17.a
- Bekisting Kolom 1.555 M² 4.1.1.22.a
b. Balok Bordes Uk. 15/30 cm
- Beton K-225 0.123 M³ 4.1.1.7.a
- Tulangan U32 12.480 Kg 4.1.1.17.b
- Tulangan U24 5.254 Kg 4.1.1.17.a
- Bekisting Balok 2.044 M² 4.1.1.23.b
c.Tangga
- Beton K-225 1.919 M³ 4.1.1.7.a
- Tulangan U24 186.900 Kg 4.1.1.17.b
- Wiremesh M6 63.319 Kg 4.1.1.19
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA
1 2 3 4 5
- Bekisting Balok 11.400 M² 4.1.1.23.b
12 Ramp Type 1
a. Galian Tanah 2.695 M³ 2.3.1.1
b. Urugan Pasir Bawah Pondasi 0.490 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm 24.000 Btg -
d.Pondasi
- Beton K-225 3.442 M³ 4.1.1.7.a
- Tulangan U24 252.809 Kg 4.1.1.17.a
- Bekisting Sloof 12.132 M² 4.1.1.21.b
e. Urugan Pasir Bawah Ramp 1.950 M³ 2.3.1.11
f. Ramp
- Beton K-225 0.581 M³ 4.1.1.7.a
- Wiremesh M6 59.420 Kg 4.1.1.19
12 Ramp Type 2
a. Galian Tanah 2.695 M³ 2.3.1.1
b. Urugan Pasir Bawah Pondasi 0.490 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm 24.000 Btg -
d.Pondasi
- Beton K-225 3.442 M³ 4.1.1.7.a
- Tulangan U24 252.809 Kg 4.1.1.17.a
- Bekisting Sloof 12.132 M² 4.1.1.21.b
e. Urugan Pasir Bawah Ramp 1.950 M³ 2.3.1.11
f. Ramp
- Beton K-225 0.581 M³ 4.1.1.7.a
- Wiremesh M6 59.420 Kg 4.1.1.19
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA
1 2 3 4 5
12 Ramp Type 3
a. Galian Tanah 2.695 M³ 2.3.1.1
b. Urugan Pasir Bawah Pondasi 0.490 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm 24.000 Btg -
d.Pondasi
- Beton K-225 3.442 M³ 4.1.1.7.a
- Tulangan U24 252.809 Kg 4.1.1.17.a
- Bekisting Sloof 12.132 M² 4.1.1.21.b
e. Urugan Pasir Bawah Ramp 1.950 M³ 2.3.1.11
f. Ramp
- Beton K-225 0.581 M³ 4.1.1.7.a
- Wiremesh M6 59.420 Kg 4.1.1.19
12 Ramp Type 4
a. Galian Tanah 2.695 M³ 2.3.1.1
b. Urugan Pasir Bawah Pondasi 0.490 M³ 2.3.1.11
c. Cerucuk dia 8 - 400 cm 24.000 Btg -
d.Pondasi
- Beton K-225 3.442 M³ 4.1.1.7.a
- Tulangan U24 252.809 Kg 4.1.1.17.a
- Bekisting Sloof 12.132 M² 4.1.1.21.b
e. Urugan Pasir Bawah Ramp 1.950 M³ 2.3.1.11
f. Ramp
- Beton K-225 0.581 M³ 4.1.1.7.a
- Wiremesh 59.420 Kg 4.1.1.19
1 2 3 4 5
- Tulangan U24 15.761 Kg 4.1.1.17.a
- Bekisting Balok 5.767 M² 4.1.1.23.b
5 Plat Lantai t = 10 cm
- Beton K-225 66.193 M³ 4.1.1.7.a
- Wiremesh 4,064.220 Kg 4.1.1.19
- Bekisting Lantai Err:509 M² 4.1.1.24.b
6 Kolom Beton Bertulang Type K1 Uk. 35/35 cm
- Beton K-225 5.255 M³ 4.1.1.7.a
- Tulangan U32 552.640 Kg 4.1.1.17.b
- Tulangan U24 125.136 Kg 4.1.1.17.a
- Bekisting Kolom Berulang 187.255 M² 4.1.1.22.b
10 Kolom Beton Bertulang Type K2 Uk. 35/75 cm
- Beton K-225 1.313 M³ 4.1.1.7.a
- Tulangan U32 101.108 Kg 4.1.1.17.b
- Tulangan U24 23.700 Kg 4.1.1.17.a
- Bekisting Kolom Berulang 10.550 M² 4.1.1.22.b
11 Kolom Praktis Uk. 9/9 cm
- Beton K-175 3.996 M³ 4.1.1.7.a
- Tulangan U24 1,050.621 Kg 4.1.1.17.a
- Bekisting Sloof Berulang 88.803 M² 4.1.1.21.c
12 Balok Praktis Uk. 9/9 cm
- Beton K-175 3.197 M³ 4.1.1.7.a
- Tulangan U24 840.497 Kg 4.1.1.17.a
- Bekisting Sloof Berulang 71.042 M² 4.1.1.21.c
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA
1 2 3 4 5
IV ELEVASI 8,80 DAN 9,00
1 Ring Balok Uk. 25/55 cm
- Beton K-225 5.108 M³ 4.1.1.7.a
- Tulangan U32 710.400 Kg 4.1.1.17.b
- Tulangan U24 137.144 Kg 4.1.1.17.a
- Bekisting Balok Berulang 50.153 M² 4.1.1.22.b
2 Ring Balok Uk. 20/45 cm
- Beton K-225 9.932 M³ 4.1.1.7.a
- Tulangan U32 918.450 M³ 4.1.1.17.b
- Tulangan U24 319.792 M³ 4.1.1.17.a
- Bekisting Balok Berulang 121.385 M³ 4.1.1.22.b
3 Ring Balok Uk. 9/9 cm
- Beton K-175 0.972 M³ 4.1.1.7.a
- Tulangan U24 194.506 Kg 4.1.1.17.a
- Bekisting Sloof Berulang 21.600 M² 4.1.1.21.c
Sub Total D
D PEKERJAAN ATAP
I Elevasi +4,00
1 Balok Dak Uk. 30/65 cm
- Beton K-225 1.997 M³ 4.1.1.7.a
- Tulangan U32 239.760 Kg 4.1.1.17.b
- Tulangan U24 56.406 Kg 4.1.1.17.a
- Bekisting Balok Berulang 16.940 M² 4.1.1.23.b
2 Balok Dak Uk. 25/55 cm
- Beton K-225 3.288 M³ 4.1.1.7.a
- Tulangan U32 564.768 Kg 4.1.1.17.b
- Tulangan U24 107.835 Kg 4.1.1.17.a
- Bekisting Balok Berulang 33.609 M² 4.1.1.23.b
3 Balok Dak Uk. 20/40cm
- Beton K-225 3.236 M³ 4.1.1.7.a
- Tulangan U32 466.683 Kg 4.1.1.17.b
- Tulangan U24 142.200 Kg 4.1.1.17.a
- Bekisting Balok Berulang 43.140 M² 4.1.1.23.b
4 Balok Dak Uk. 15/40 cm
- Beton K-225 0.488 M³ 4.1.1.7.a
- Tulangan U32 45.136 Kg 4.1.1.17.b
- Tulangan U24 25.952 Kg 4.1.1.17.a
- Bekisting Balok Berulang 8.138 M² 4.1.1.23.b
5 Plat Dak t = 10 cm
- Beton K-225 13.630 M³ 4.1.1.7.a
- Wiremesh 732.285 Kg 4.1.1.19
- Bekisting Lantai Berulang Err:509 M² 4.1.1.24.b
II ELEVASI 8,00 M
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA
1 2 3 4 5
1 Balok Dak Uk. 25/55 cm
- Beton K-225 13.258 M³ 4.1.1.7.a
- Tulangan U32 2,259.960 Kg 4.1.1.17.b
- Tulangan U24 434.658 Kg 4.1.1.17.a
- Bekisting Balok Berulang 135.528 M² 4.1.1.23.b
2 Balok Dak Uk. 25/55 cm + Dinding Paraped
- Beton K-225 0.369 M³ 4.1.1.7.a
- Tulangan U32 44.400 Kg 4.1.1.17.b
- Tulangan U24 9.401 Kg 4.1.1.17.a
- Wiremesh M6 1.151 4.1.1.19
- Bekisting Balok Berulang 3.875 M² 4.1.1.23.b
3 Balok Dak Uk. 20/45 cm
- Beton K-225 3.101 M³ 4.1.1.7.a
- Tulangan U32 368.950 Kg 4.1.1.17.b
- Tulangan U24 128.612 Kg 4.1.1.17.a
- Bekisting Balok Berulang 39.870 M² 4.1.1.23.b
4 Balok Dak Uk. 20/45 cm + Dinding Paraped
- Beton K-225 2.540 M³ 4.1.1.7.a
- Tulangan U32 215.875 Kg 4.1.1.17.b
- Tulangan U24 73.865 Kg 4.1.1.17.a
- Wiremesh M6 11.697 4.1.1.19
- Bekisting Balok Berulang 33.020 M² 4.1.1.23.b
NO URAIAN PEKERJAAN VOLUME SAT KODE
ANALISA
1 2 3 4 5
5 Balok Dak Uk. 15/40 cm
- Beton K-225 0.619 M³ 4.1.1.7.a
- Tulangan U32 62.400 Kg 4.1.1.17.b
- Tulangan U24 33.773 Kg 4.1.1.17.a
- Bekisting Balok Berulang 10.313 M² 4.1.1.23.b
6 Plat Dak t = 10 cm
- Beton K-225 22.138 M³ 4.1.1.7.a
- Wiremesh M6 1,189.337 Kg 4.1.1.19
- Bekisting Lantai Berulang 186.945 M² 4.1.1.24.b
7 Kolom Praktis Uk. 9/9 cm
- Beton K-175 0.252 M³ 4.1.1.7.a
- Tulangan U24 66.123 Kg 4.1.1.17.a
- Bekisting Sloof 5.589 M² 4.1.1.21.c
8 Rangka Baja Ringan Zincalume 680.400 M² 8.1.1.3
9 Atap Zincallum Gelombang Persegi 0,35 680.400 M² 4.5.2.41.b
10 Perabung Plat 75.546 M' 4.5.2.39.
11 Lisplank Wood Plank 98.600 M' 8.1.1.4
Sub Total D
JUMLAH TOTAL PEKERJAAN STRUKTUR
JUMLAH TOTAL PPN 10 %
JUMLAH TOTAL PEKERJAAN STRUKTUR + PPN 10 %
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
:
:
N :
:
ARAN :
Ko
ns
ult
KODE HARGA SATUAN
RAIAN PEKERJAAN VOLUME SAT SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
PENDAHULUAN
Bowplank 138.000 M' 2.2.1.4.a 65,488.50 9,037,413.00:
an 1.000 Lsm 15,000,000.00 15,000,000.00PT
tara 118.500 M' 304,623.00 36,097,825.50.
A
Sub Total A R
PONDASI S
ini Pile 20 x 20 528.000 Btg 1,760,000.00 929,280,000.00E
K
n Mini Pile 20 x 20 528.000 Btg 120,000.00 63,360,000.00O
176.000 Titik 40,000.00 7,040,000.00N
Pondasi 66.413 M³ 2.3.1.1 90,612.50 6,017,802.66K
t = 15 cm 6.316 M³ 2.3.1.11 141,845.00 895,893.02H
AT
= 5 cm 3.248 M³ 4.1.1.4 996,598.84 3,236,454.72UL
IS
ady Mix K-300 3.240 M³ B.13.i.2 1,682,037.50 5,449,801.50TI
W
n U32 411.840 Kg 4.1.1.17.b 18,317.75 7,543,982.16A
g Pondasi 21.600 M² 4.1.1.20.a 135,487.00 2,926,519.20R
E
ady Mix K-300 0.864 M³ B.13.i.2 1,682,037.50 1,453,280.40KA
YA
n U32 93.184 Kg 4.1.1.17.b 18,317.75 1,706,921.22S
g Pondasi 4.320 M² 4.1.1.20.a 135,487.00 585,303.84A
W
ady Mix K-300 8.748 M³ B.13.i.2 1,682,037.50 14,714,464.05ak
tu
n U32 570.024 Kg 4.1.1.17.b 18,317.75 10,441,557.13Pe
g Pondasi 19.440 M² 4.1.1.20.a 135,487.00 2,633,867.28lak
sa
na
ady Mix K-300 6.048 M³ B.13.i.2 1,682,037.50 10,172,962.80an
n U32 529.984 Kg 4.1.1.17.b 18,317.75 9,708,114.42
g Pondasi 20.160 M² 4.1.1.20.a 135,487.00 2,731,417.92:
16
7
ady Mix K-300 21.446 M³ B.13.i.2 1,682,037.50 36,072,135.21Ha
n U32 1,775.072 Kg 4.1.1.17.b 18,317.75 32,515,325.13ri
g Pondasi 59.160 M² 4.1.1.20.a 135,487.00 8,015,410.92Ka
le
si Uk. 35/35 cm nd
225 3.026 M³ 4.1.1.7.a 1,244,365.64 3,765,139.34er
M
ul
:
16
Ko
7
ns
Ha
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN ri
SUB TOTAL (Rp.) an
ANALISA (Rp.) KaJUM
Pe
le
ng
nd
2 3 4 5 6 7 aw
er
as
n U32 763.648 Kg 4.1.1.17.b 18,317.75 13,988,313.15M
n U24 36.024 Kg 4.1.1.17.a 16,585.25 597,467.05ul
:
ai
g Pondasi 20.368 M² 4.1.1.20.a 135,487.00 2,759,531.47PT
Ke
.
si Uk. 35/75 cm rja
A
225 0.171 M³ 4.1.1.7.a 1,244,365.64 212,319.89R
n U32 35.168 Kg 4.1.1.17.b 18,317.75 644,198.63S:
n U24 1.580 Kg 4.1.1.17.a 16,585.25 26,204.70E18
K
g Pondasi 0.980 M² 4.1.1.20.a 135,487.00 132,777.26Jul
O
Sub Total B i 1
N
20
STRUKTUR K
16
5M H
Ko
AT
55 cm ntr
UL
ak
225 0.928 M³ 4.1.1.7.a 1,244,365.64 1,154,926.86IS
tor
n U32 177.600 Kg 4.1.1.17.b 18,317.75 3,253,232.40TI
Pe
W
n U24 32.074 Kg 4.1.1.17.a 16,585.25 531,955.31lak
A
g Sloof 9.488 M² 4.1.1.21.b 135,487.00 1,285,432.91sa
R
na
40 cm E
225 0.800 M³ 4.1.1.7.a 1,244,365.64 995,492.51KA
:
YA
n U32 92.238 Kg 4.1.1.17.b 18,317.75 1,689,583.47PT
S
n U24 28.045 Kg 4.1.1.17.a 16,585.25 465,133.34.A
G
g Sloof 10.000 M² 4.1.1.21.b 135,487.00 1,354,870.00WU
ak
10,730,626.80N tu
A
Pe
K
lak
A
sa
R
na
YA
an
N
U
:
S
16
A
7
NT
Ha
A
ri
R
Ka
A
le
ks
nd
o
er
M
ul
ai
Ke
rja
:
18
Jul
PT
i
.
20
K
16
R
Ko
E
ntr
A
lak
sa
na
Ko
:ns
ult
PT
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) an
ANALISA (Rp.) . JUM
Pe
G
ng
U
2 3 4 5 6 7 aw
N
as
A
00 M
K
55 cm :A
225 36.110 M³ 4.1.1.7.a 1,244,365.64 44,933,654.44PT R
.
n U32 6,073.920 Kg 4.1.1.17.b 18,317.75 111,260,548.08YA
A
N
n U24 1,269.688 Kg 4.1.1.17.a 16,585.25 21,058,092.90R
U
g Sloof 369.121 M² 4.1.1.21.b 135,487.00 50,011,130.80S S
45 cm E
A
K
225 12.611 M³ 4.1.1.7.a 1,244,365.64 15,692,072.92NT O
A
n U32 1,808.640 Kg 4.1.1.17.b 18,317.75 33,130,215.36N R
n U24 533.566 Kg 4.1.1.17.a 16,585.25 8,849,325.50K A
g Sloof 162.135 M² 4.1.1.21.b 135,487.00 21,967,184.75H ks
AT
o
40 cm UL
225 2.586 M³ 4.1.1.7.a 1,244,365.64 3,217,929.55IS
n U32 355.213 Kg 4.1.1.17.b 18,317.75 6,506,693.77TI
W
n U24 116.130 Kg 4.1.1.17.a 16,585.25 1,926,045.08A
g Sloof 34.480 M² 4.1.1.21.b 135,487.00 4,671,591.76R
30 cm E
225 0.258 M³ 4.1.1.7.a 1,244,365.64 320,673.03KA
YA
n U32 40.102 Kg 4.1.1.17.b 18,317.75 734,585.74S
n U24 16.590 Kg 4.1.1.17.a 16,585.25 275,149.30A PT
g Sloof 4.725 M² 4.1.1.21.b 135,487.00 640,108.33W .
ak
K
Uk. 10/30 cm
tu
R
ady Mix K-225 1.972 M³ 4.1.1.7.a 1,244,365.64 2,453,266.86Pe E
h M6 54.999 Kg 4.1.1.19 13,993.65 769,637.46lakA
g Sloof 39.430 M² 4.1.1.21.b 135,487.00 5,342,252.41SI sa
na
N
= 10 cm an
D
ady Mix K-225 79.918 M³ 4.1.1.7.a 1,244,365.64 99,447,368.86O
h 4,293.601 Kg 4.1.1.19 13,993.65 60,083,153.35:P
asir t = 65 cm Err:509 M² 2.3.1.11 141,845.00 Err:509 16
U
7
T
Bertulang Type K1 Uk. 35/35 cm Ha
R
225 23.410 M³ 4.1.1.7.a 1,244,365.64 29,130,288.57ri A
n U32 2,461.760 Kg 4.1.1.17.b 18,317.75 45,093,904.24Ka B
le
n U24 97.720 Kg 4.1.1.17.a 16,585.25 1,620,707.98A nd
N
g Kolom Berulang 250.633 M² 4.1.1.22.b 224,636.50 56,301,207.59er G
Bertulang Type K1 Uk. 35/75 cm M
S
225 1.024 M³ 4.1.1.7.a 1,244,365.64 1,273,919.33A ul
ai
n U32 101.108 Kg 4.1.1.17.b 18,317.75 1,852,071.07Ke
n U24 18.960 Kg 4.1.1.17.a 16,585.25 314,456.34rja
g Kolom 8.130 M² 4.1.1.22.a 300,916.00 2,446,447.08
s Uk. 9/9 cm
:
175 3.323 M³ 4.1.1.5.a 1,173,609.45 3,900,138.9318
n U24 1,126.540 Kg 4.1.1.17.a 16,585.25 18,683,947.54Jul
g Sloof Berulang 93.465 M² 4.1.1.21.c 121,107.25 11,319,289.12i
20
Uk. 9/9 cm 16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
175 2.659 M³ 4.1.1.5.a 1,173,609.45 3,120,111.14
n U24 901.232 Kg 4.1.1.17.a 16,585.25 14,947,158.03:
g Sloof 74.772 M² 4.1.1.21.b 121,107.25 9,055,431.30PT
.
1
A
ah 1.800 M³ 2.3.1.1 90,612.50 163,102.50R
ir 0.360 M³ 2.3.1.11 141,845.00 51,064.20S
a 8 - 400 cm + Pemancangan 30.000 Btg 15,000.00 450,000.00E
K
O
225 0.738 M³ 4.1.1.7.a 1,244,365.64 918,341.84N
n U24 28.470 Kg 4.1.1.17.a 16,585.25 472,182.07K
g Sloof 4.800 M² 4.1.1.21.b 135,487.00 650,337.60H
AT
ga UL
225 1.332 M³ 4.1.1.7.a 1,244,365.64 1,657,495.03IS
n U24 227.840 Kg 4.1.1.17.a 16,585.25 3,778,783.36TI
W
h M6 11.052 Kg 4.1.1.19 13,993.65 154,657.82A
g Sloof 10.200 M² 4.1.1.21.b 135,487.00 1,381,967.40R
E
KA
YA
S
A
W
ak
tu
Pe
lak
sa
na
an
:
16
7
Ha
ri
Ka
le
nd
er
M
ul
ai
Ke
rja
:
18
Jul
i
20
16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
2
ah 2.400 M³ 2.3.1.1 90,612.50 217,470.00:
ir 0.480 M³ 2.3.1.11 141,845.00 68,085.60PT
a 8 - 400 cm + Pemancangan 40.000 Btg 15,000.00 600,000.00.
A
R
225 0.984 M³ 4.1.1.7.a 1,244,365.64 1,224,455.79S
n U24 49.662 Kg 4.1.1.17.a 16,585.25 823,656.69E
K
g Sloof 6.400 M² 4.1.1.21.b 135,487.00 867,116.80O
N
225 1.776 M³ 4.1.1.7.a 1,244,365.64 2,209,993.38K
n U24 302.511 Kg 4.1.1.17.a 16,585.25 5,017,220.56H
AT
h M6 14.736 Kg 4.1.1.19 13,993.65 206,210.43UL
g Sloof 13.600 M² 4.1.1.21.b 135,487.00 1,842,623.20IS
3 TI
W
on Bertulang Type KT Uk. 20/20 cm A
225 0.080 M³ 4.1.1.7.a 1,244,365.64 99,549.25R
n U32 12.560 Kg 4.1.1.17.b 18,317.75 230,070.94E
n U24 2.607 Kg 4.1.1.17.a 16,585.25 43,237.75KA
YA
g Kolom 1.555 M² 4.1.1.22.a 300,916.00 467,924.38S
es Uk. 15/30 cm A
225 0.123 M³ 4.1.1.7.a 1,244,365.64 152,590.34W
n U32 12.480 Kg 4.1.1.17.b 18,317.75 228,605.52ak
tu
n U24 5.254 Kg 4.1.1.17.a 16,585.25 87,130.61Pe
g Balok 2.044 M² 4.1.1.23.b 228,085.00 466,148.72lak
sa
na
225 1.919 M³ 4.1.1.7.a 1,244,365.64 2,388,248.76an
n U24 186.900 Kg 4.1.1.17.b 16,585.25 3,099,783.23
h M6 63.319 Kg 4.1.1.19 13,993.65 886,060.43:
g Balok 11.400 M² 4.1.1.23.b 228,085.00 2,600,169.0016
7
4 Ha
on Bertulang Type KT Uk. 20/20 cm ri
225 0.080 M³ 4.1.1.7.a 1,244,365.64 99,549.25Ka
le
n U32 12.560 Kg 4.1.1.17.b 18,317.75 230,070.94nd
n U24 2.607 Kg 4.1.1.17.a 16,585.25 43,237.75er
g Kolom 1.555 M² 4.1.1.22.a 300,916.00 467,924.38M
es Uk. 15/30 cm ul
ai
225 0.123 M³ 4.1.1.7.a 1,244,365.64 152,590.34Ke
n U32 12.480 Kg 4.1.1.17.b 18,317.75 228,605.52rja
n U24 5.254 Kg 4.1.1.17.a 16,585.25 87,130.61
g Balok 2.044 M² 4.1.1.23.b 228,085.00 466,148.72
:
18
225 1.919 M³ 4.1.1.7.a 1,244,365.64 2,388,248.76Jul
n U24 186.900 Kg 4.1.1.17.b 16,585.25 3,099,783.23i
20
h M6 63.319 Kg 4.1.1.19 13,993.65 886,060.4316
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
g Balok 11.400 M² 4.1.1.23.b 228,085.00 2,600,169.00
:
ah 2.695 M³ 2.3.1.1 90,612.50 244,200.69PT
ir Bawah Pondasi 0.490 M³ 2.3.1.11 141,845.00 69,504.05.
A
a 8 - 400 cm 24.000 Btg - 15,000.00 360,000.00R
S
225 3.442 M³ 4.1.1.7.a 1,244,365.64 4,283,448.74E
K
n U24 252.809 Kg 4.1.1.17.a 16,585.25 4,192,899.64O
g Sloof 12.132 M² 4.1.1.21.b 135,487.00 1,643,728.28N
ir Bawah Ramp 1.950 M³ 2.3.1.11 141,845.00 276,597.75K
H
AT
225 0.581 M³ 4.1.1.7.a 1,244,365.64 722,540.91UL
h M6 59.420 Kg 4.1.1.19 13,993.65 831,500.58IS
TI
W
ah 2.695 M³ 2.3.1.1 90,612.50 244,200.69A
ir Bawah Pondasi 0.490 M³ 2.3.1.11 141,845.00 69,504.05R
a 8 - 400 cm 24.000 Btg - 15,000.00 360,000.00E
KA
YA
225 3.442 M³ 4.1.1.7.a 1,244,365.64 4,283,448.74S
n U24 252.809 Kg 4.1.1.17.a 16,585.25 4,192,899.64A
g Sloof 12.132 M² 4.1.1.21.b 135,487.00 1,643,728.28W
ir Bawah Ramp 1.950 M³ 2.3.1.11 141,845.00 276,597.75ak
tu
Pe
225 0.581 M³ 4.1.1.7.a 1,244,365.64 722,540.91lak
h M6 59.420 Kg 4.1.1.19 13,993.65 831,500.58sa
na
an
:
16
7
Ha
ri
Ka
le
nd
er
M
ul
ai
Ke
rja
:
18
Jul
i
20
16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
:
16
7
Ha
ri
Ka
le
nd
er
M
ul
ai
Ke
rja
:
18
Jul
i
20
16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
0 DAN 9,00
k. 25/55 cm :
225 5.108 M³ 4.1.1.7.a 1,244,365.64 6,356,375.24PT
n U32 710.400 Kg 4.1.1.17.b 18,317.75 13,012,929.60.
A
n U24 137.144 Kg 4.1.1.17.a 16,585.25 2,274,567.53R
g Balok Berulang 50.153 M² 4.1.1.22.b 224,636.50 11,266,082.07S
k. 20/45 cm E
K
225 9.932 M³ 4.1.1.7.a 1,244,365.64 12,358,417.37O
n U32 918.450 M³ 4.1.1.17.b 18,317.75 16,823,937.49N
n U24 319.792 M³ 4.1.1.17.a 16,585.25 5,303,830.27K
g Balok Berulang 121.385 M³ 4.1.1.22.b 224,636.50 27,267,501.55H
AT
k. 9/9 cm UL
175 0.972 M³ 4.1.1.7.a 1,173,609.45 1,140,748.39IS
n U24 194.506 Kg 4.1.1.17.a 16,585.25 3,225,928.98TI
W
g Sloof Berulang 21.600 M² 4.1.1.21.c 121,107.25 2,615,916.60A
101,646,235.07R
Sub Total D E
ATAP KA
YA
0 S
. 30/65 cm A
225 1.997 M³ 4.1.1.7.a 1,244,365.64 2,484,376.00W
n U32 239.760 Kg 4.1.1.17.b 18,317.75 4,391,863.74ak
tu
n U24 56.406 Kg 4.1.1.17.a 16,585.25 935,507.61Pe
g Balok Berulang 16.940 M² 4.1.1.23.b 228,085.00 3,863,759.90lak
. 25/55 cm sa
na
225 3.288 M³ 4.1.1.7.a 1,244,365.64 4,091,240.91an
n U32 564.768 Kg 4.1.1.17.b 18,317.75 10,345,279.03
n U24 107.835 Kg 4.1.1.17.a 16,585.25 1,788,470.43:
g Balok Berulang 33.609 M² 4.1.1.23.b 228,085.00 7,665,651.7416
7
. 20/40cm Ha
225 3.236 M³ 4.1.1.7.a 1,244,365.64 4,026,145.03ri
n U32 466.683 Kg 4.1.1.17.b 18,317.75 8,548,573.36Ka
le
n U24 142.200 Kg 4.1.1.17.a 16,585.25 2,358,422.55nd
g Balok Berulang 43.140 M² 4.1.1.23.b 228,085.00 9,839,586.90er
. 15/40 cm M
225 0.488 M³ 4.1.1.7.a 1,244,365.64 607,561.52ul
ai
n U32 45.136 Kg 4.1.1.17.b 18,317.75 826,789.96Ke
n U24 25.952 Kg 4.1.1.17.a 16,585.25 430,412.12rja
g Balok Berulang 8.138 M² 4.1.1.23.b 228,085.00 1,856,041.69
0 cm
:
225 13.630 M³ 4.1.1.7.a 1,244,365.64 16,961,014.7818
h 732.285 Kg 4.1.1.19 13,993.65 10,247,342.53Jul
g Lantai Berulang Err:509 M² 4.1.1.24.b 253,676.50 Err:509 i
20
0M 16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
. 25/55 cm
225 13.258 M³ 4.1.1.7.a 1,244,365.64 16,497,955.22:
n U32 2,259.960 Kg 4.1.1.17.b 18,317.75 41,397,382.29PT
n U24 434.658 Kg 4.1.1.17.a 16,585.25 7,208,911.59.
A
g Balok Berulang 135.528 M² 4.1.1.23.b 228,085.00 30,911,789.84R
. 25/55 cm + Dinding Paraped S
225 0.369 M³ 4.1.1.7.a 1,244,365.64 458,859.83E
K
n U32 44.400 Kg 4.1.1.17.b 18,317.75 813,308.10O
n U24 9.401 Kg 4.1.1.17.a 16,585.25 155,917.94N
h M6 1.151 4.1.1.19 13,993.65 16,110.19K
g Balok Berulang 3.875 M² 4.1.1.23.b 228,085.00 883,829.38H
AT
. 20/45 cm UL
225 3.101 M³ 4.1.1.7.a 1,244,365.64 3,858,777.85IS
n U32 368.950 Kg 4.1.1.17.b 18,317.75 6,758,333.86TI
W
n U24 128.612 Kg 4.1.1.17.a 16,585.25 2,133,062.17A
g Balok Berulang 39.870 M² 4.1.1.23.b 228,085.00 9,093,748.95R
. 20/45 cm + Dinding Paraped E
225 2.540 M³ 4.1.1.7.a 1,244,365.64 3,160,688.73KA
YA
n U32 215.875 Kg 4.1.1.17.b 18,317.75 3,954,344.28S
n U24 73.865 Kg 4.1.1.17.a 16,585.25 1,225,069.49A
h M6 11.697 4.1.1.19 13,993.65 163,679.53W
ak
g Balok Berulang 33.020 M² 4.1.1.23.b 228,085.00 7,531,366.70tu
Pe
lak
sa
na
an
:
16
7
Ha
ri
Ka
le
nd
er
M
ul
ai
Ke
rja
:
18
Jul
i
20
16
Ko
ntr
Ko
ns
ult
RAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN SUB TOTAL (Rp.) anJUM
ANALISA (Rp.) Pe
ng
2 3 4 5 6 7 aw
as
. 15/40 cm
225 0.619 M³ 4.1.1.7.a 1,244,365.64 769,951.24:
n U32 62.400 Kg 4.1.1.17.b 18,317.75 1,143,027.60PT
n U24 33.773 Kg 4.1.1.17.a 16,585.25 560,125.36.
A
g Balok Berulang 10.313 M² 4.1.1.23.b 228,085.00 2,352,126.56R
0 cm S
225 22.138 M³ 4.1.1.7.a 1,244,365.64 27,547,144.38E
K
h M6 1,189.337 Kg 4.1.1.19 13,993.65 16,643,168.33O
g Lantai Berulang 186.945 M² 4.1.1.24.b 253,676.50 47,423,553.29N
s Uk. 9/9 cm K
175 0.252 M³ 4.1.1.7.a 1,173,609.45 295,168.64H
AT
n U24 66.123 Kg 4.1.1.17.a 16,585.25 1,096,666.49UL
g Sloof 5.589 M² 4.1.1.21.c 121,107.25 676,868.42IS
Ringan Zincalume 680.400 M² 8.1.1.3 165,000.00 112,266,000.00TI
W
m Gelombang Persegi 0,35 680.400 M² 4.5.2.41.b 235,235.00 160,053,894.00A
t 75.546 M' 4.5.2.39. Err:509 Err:509 R
d Plank 98.600 M' 8.1.1.4 55,000.00 5,423,000.00E
Sub Total D KA
YA
JUMLAH TOTAL PEKERJAAN STRUKTUR S
JUMLAH TOTAL PPN 10 % A
JUMLAH TOTAL PEKERJAAN STRUKTUR + PPN 10 % W
ak
tu
Pe
lak
sa
na
an
:
16
7
Ha
ri
Ka
le
nd
er
M
ul
ai
Ke
rja
:
18
Jul
i
20
16
Ko
ntr
Dalam bahasa Indonesia
In English
Formulasi Perhitungan :
Nilai Barang Total (3C) - Nilai Barang Luar Negeri (3B)
Nilai Gabungan Barang dan Jasa (9C)
% TKDN (Gabungan Barang dan jasa) = +
Nilai JasaTotal (8C) - Nilai Jasa Luar Negeri (8B)
Nilai Gabungan Barang dan Jasa (9C)
sa (Rp.) TKDN
Total
% Barang/Jasa Gabungan
KDN
(5) (7) (8)
3.00% - 3.00%
-
- - -
- - Err:509
r Negeri (8B)
20 November 2019
CV. DUTA KHATULISTIWA
RIEFKI GUNAWAN SETIADI,A.Md
DIREKTUR
JADWAL WAKTU PELAKSANAAN
B. Err:509
I. Err:509 Err:509 Err:509
II. Err:509 Err:509 Err:509 Err:509 Err:509
III. Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV. Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V. Err:509 Err:509
C. Err:509
I. Err:509 Err:509 Err:509
II. Err:509 Err:509
III. Err:509 Err:509
IV. Err:509 Err:509
V. Err:509 Err:509
VI. Err:509 Err:509
VII. Err:509 Err:509
VIII. Err:509 Err:509
IX, Err:509 Err:509
BOBOT RENCANA Err:509 11.40% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
BOBOT KUMULATIF 0.00% 11.40% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
336 PONTIANAK
CV. DUTA KH
RIEFKI GUN
Kepala Cabang
TU PELAKSANAAN
5.48%
Err:509 Waktu
Err:509 Err:509 Err:509 Pelaksanaan
210 hari
kalender
Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 50%
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0%
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Kepada Yth :
Kelompok Kerja Pemilihan
Pokja Pemilihan Balai Layanan Pengadaan ( BLP) Ka
Di -
Jl. Jend. Sudirman No.37 Ketapang
Perihal :
an No.37 Ketapang
RIEFKI GUNAWAN
DIREKTUR
Pontianak, 15 Mei 2019
AR
pemasukan penawaran.
DUTA KHATULISTIWA
KI GUNAWAN SETIADI,A.Md
KTUR
5 Mei 2019
g tender
Jual
g tercantum dalam
TABEL KENDALI DOKUMEN
DATA PROYEK
KEGIATAN
PEKERJAAN PEMBANGUNAN MENARA MERCUSUAR
LOKASI D.I WAY PALAKIA - KEC. SUKAU, KAB. LAMPUNG BARAT
NOMOR PAKET
NOMOR DOKUMEN 027/01/POKJA/DAK IR.8/II.07/II/2015
TANGGAL DOKUMEN 19 November 2019
SUMBER DANA APBD Tahun Anggaran 2019
TH ANGGARAN 2019
WAKTU PELAKSANAAN 150 (Seratus Lima Puluh) hari kalender
MASA JAMINAN PENAWARAN
SURAT PENAWARAN 60 (Enam Puluh) hari kalender
PAGU Rp 1,500,000,000
DATA PERUSAHAAN
NAMA PERUSAHAAN CV. DUTA KHATULISTIWA
NO REK GIRO NT
NO NPWP 03.268.976.2-701.000
ALAMAT PERUSAHAAN Jl. Komplek Terminal Siantan Indah N0.A-7
PIMPINAN RIEFKI GUNAWAN SETIADI,A.Md
JABATAN DIREKTUR
TANGGAL PENAWARAN 20 November 2019 Pontianak
NOMOR SURAT 25
BULAN SURAT XI
PAGU Rp 1,500,000,000.00
NETT KONTRAK Rp 1,363,636,363.64
PPN Rp 136,363,636.36
PPH Rp 34,090,909.09
PENDAPATAN PROYEK Rp 1,329,545,454.55
PERSENTASE PENAWARAN 24.00%
HARGA PENAWARAN Rp 360,000,000.00
Surat Penawaran
Jaminan Penawaran Asli
Rekapitulasi RAB
Daftar Kuantitas Dan Harga
Analisa Pekerjaan
Daftar Harga Upah
Daftar Harga Bahan
Daftar Harga Alat
Surat Kuasa / Akta Notaris
Metode Pelaksanaan
Jadwal Pelaksanaan Pek
Daftar Peralatan Utama
Daftar Personil Inti
Spesifikasi Teknis
Formulir TKDN
ADAAN BARANG / JASA KANTOR LAYANAN PENGADAAN PADA BIDANG PENGAIRAN
S PEKERJAAN UMUM LAMPUNG BARAT TAHUN 2015
1 2 3 4
- Pembongkaran dan Pembersihan Ramsu - Terluka terkena peralatan kerja - kecelakaan kerja
- Disimpan Digudang Material Disnav Pontianak - Kecelakaan Lalu lintas pada saat mobi
- kecelakaan kerja
- Pemancangan Mini Pile 25 x 25 K450 - Tertimpa material besi , batu dan - kecelakaan kerja
adukan beton
- Terkena paku pada saat pembuatan
- Join Welding - kecelakaan kerja
bekisting
- Pekerjaan Beton Pondasi - Terpeleset jatuh pada saat perbaikan- kecelakaan kerja
- Pekerjaan Pemasangan Menara - Terpeleset jatuh pada saat perbaikan- kecelakaan kerja
Terkena / Terluka karena peralatan
- Pengecatan Menara Dengan Cat Menie Marine Paint - kecelakaan kerja
kerja
- Pengecatan Menara Dengan Cat Putih Menie Marine Paint Tertusuk Paku / baut kayu belian - kecelakaan kerja
- Pekerjaan Sistem lampu Suar ML300 - Terjatuh dari ketinggian - kecelakaan kerja
- Pekerjaan Papan Nama Lampu Suar - Bahaya Luka pada tangan dan kaki - kecelakaan kerja
PENILAIAN RISIKO
SKALA PENETAPAN PENGENDALIAN
TINGKAT PRIORITAS RISIKO K3
KEKERAPAN KEPARAHAN
RISIKO
5 6 7 8 9
20 November 2019
CV. DUTA KHATULISTIWA
RIEFKI GUNAWAN SETIADI,A.Md
DIREKTUR
DOKUMEN PENAWARAN
PEMBANGUNAN MENARA
MERCUSUAR
KALIMANTAN BARAT
TAHUN ANGGARAN 2019
DOKUMEN KUALIFIKASI
PEMBANGUNAN MENARA
MERCUSUAR
KALIMANTAN BARAT
TAHUN ANGGARAN 2019
Pontianak, 20 November 2019
Nomor : 25/DMS/SP/XI/2015
Lampiran : -
Kepada Yth
PENGADAAN BARANG / JASA KANTOR LAYANAN PENGADAAN PADA BIDANG PENGAIRAN DINAS PEKERJAAN UMUM
LAMPUNG BARAT TAHUN 2015
Di -
LIWA
Sehubungan dengan pengumuman Pemilihan Langsung dengan Pascakualifikasi dan Dokumen Pengadaan Nomor:
027/01/POKJA/DAK IR.8/II.07/II/2015 Tanggal 19 November 2019 setelah kami pelajari dengan seksama Dokumen Pengadaan
dan Berita Acara Pemberian Penjelasan [serta adendum Dokumen Pengadaan], dengan ini kami mengajukan penawaran untuk
Pekerjaan PEMBANGUNAN MENARA MERCUSUAR sebesar :
Rp 1,498,740,000.00
Terbilang : ( Satu Milyar Empat Ratus Sembilan Puluh Delapan Juta Tujuh Ratus Empat Puluh Ribu Rupiah )
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen Pengadaan untuk
melaksanakan pekerjaan tersebut diatas. Surat Penawaran ini berlaku 60 (Enam Puluh) hari kalender terhitung efektif sejak
tanggal 20 November 2019
Dengan waktu pelaksanaan pekerjaan selama 150 (Seratus Lima Puluh) hari kalender
Sesuai dengan persyaratan, bersama Surat Penawaran ini kami sampaikan :
1 Jaminan Penawaran
2 Daftar Kuantitas dan Harga,
3 Surat Kuasa (apabila ada)
4 Surat Perjanjian kemitraan/Kerja Sama Operasi (apabila ada)
5 Dokumen penawaran teknis, terdiri dari
a. Metode Pelaksanaan
b. Jadwal Waktu Pelaksanaan
c. Daftar Personil Inti
d. Jenis , kapasitas, komposisi, dan jumlah peralatan utama minimal yang dibutuhkan
e. Spesifikasi Teknis
6 Formulir Rekapitulasi Perhitungan Tingkat Komponen Dalam Negeri (TKDN)
7 Dokumen Isian kualifikasi yang dikirm melalui aplikasi SPSE
Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua ketentuan yang
tercantum dalam Dokumen Pengadaan serta POKJA ULP tidak terikat untuk menetapkan penawaran terendah untuk sebagai
pemenang. Apabila dana dalam dokumen anggaran yang telah disahkan tidak tersedia atau tidak cukup tersedia dalam
DIPA/DPA-SKPA Tahun Anggaran 2015, maka pengadaan Barang/Jasa dapat dibatalkan dan kami tidak akan menuntut ganti rugi
dalam bentuk apapun
1 2
A PEKERJAAN MENARA MERCUSUAR
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PONDASI
III PEKERJAAN MENARA MERCUSUAR
IV PEKERJAAN PERALATAN SBNP
JUMLAH TOTAL
PPN 10 %
JUMLAH TOTAL + PPN 10 %
DIBULATKAN
( Satu Milyar Empat Ratus Sembilan Puluh Delapan Juta Tujuh Ratus E
TERBILANG :
Rupiah )
REKAPITULASI
RENCANA ANGGARAN BIAYA
310,647,816.00
229,177,359.49
597,033,781.56
225,632,451.00
1,362,491,408.05
136,249,140.80
1,498,740,548.85
1,498,740,000.00
atu Milyar Empat Ratus Sembilan Puluh Delapan Juta Tujuh Ratus Empat Puluh Ribu
ah )
20 November 2019
CV. DUTA KHATULISTIWA
KODE
NO URAIAN PEKERJAAN VOLUME
ANALISA
1 2 3 4
A. PEKERJAAN MENARA MERCUSUAR
I PEKERJAAN PENDAHULUAN
1 Pembongkaran dan Pembersihan Ramsu 1.00
2 Papan Nama Proyek 1.00
3 Disimpan Digudang Material Disnav Pontianak 1.00
4 Survei dan penentuan titik tetap 1.00
5 Pekerjaan uitset dan bouwplank 2.2.1.4.a 16.00
6 Direksi keet dan gudang 16.00
7 Mobilisasi dan Demobilisasi 1.00
8 Pelaporan dan dokumentasi 1.00
Sub Jumlah I
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi 2.3.1.1 32.00
2 Pengadaan Tiang Pancang (Square Pile 30x30) 288.00
3 Pemancangan Mini Pile 25 x 25 K450 288.00
4 Join Welding 32.00
5 Pekerjaan Beton Pondasi 4.1.1.7.a 34.30
6 Penulangan 4.1.1.17.a 1,617.56
7 Bekisting 76.02
Sub Jumlah II
IIIPEKERJAAN MENARA MERCUSUAR
1 Pekerjaan Konstruksi Menara Baja Galvanis 10.738,87
2 Pekerjaan Angkur Galvanis M22 600m 16,00
3 Pekerjaan Mur Baut Galvanis 16x65 mm 192,00
4 Pekerjaan Mur Baut Galvanis 16x55 mm 10,00
5 Pekerjaan Mur Baut Galvanis 16x50 mm 2.027,00
6 Pekerjaan Mur Baut Galvanis 16x45 mm 26,00
7 Pekerjaan Mur Baut Galvanis 16x40 mm 44,00
8 Pekerjaan Mur Baut Galvanis 16x35 mm 36,00
9 Pekerjaan Pemasangan Menara 10.738,87
10 Pengecatan Menara Dengan Cat Menie Marine Paint 255,52
11 Pengecatan Menara Dengan Cat Putih Menie Marine Paint 255,52
Sub Jumlah III
IV PEKERJAAN PERALATAN SBNP
KODE
NO URAIAN PEKERJAAN VOLUME
ANALISA
1 2 3 4
1 Pekerjaan Sistem lampu Suar ML300 1.00
2 Pekerjaan Solar Module 80watt Marine Grade 4.00
3 Pemasangan Bateray 12 Volt/100 Ah Vrla 4.00
4 Pekerjaan Solar Charge Controller 12V/24V 10 A 1.00
5 Pekerjaan Almari Box Ukuran Besar (Large) dan Dudukan Lampu 1.00
6 Pekerjaan Panel box 1.00
7 Radar Reflektor 1.00
8 Pekerjaan Instalasi dan Setting Lampu 1.00
9 Pekerjaan Papan Nama Lampu Suar 1.00
Sub Jumlah IV
JUMLAH TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL
JUMLAH TOTAL PPN 10 %
JUMLAH TOTAL PEKERJAAN MEKANIKAL + PPN 10 %
A ANGGARAN BIAYA
HARGA SATUAN
SAT SUB JUMLAH (Rp.)
(Rp.)
5 6 7
M³ 90,612.50 2,899,600.00
M² 350,000.00 100,800,000.00
M² 120,000.00 34,560,000.00
Titik 600,000.00 19,200,000.00
M³ 1,244,365.64 42,681,741.50
Kg 16,585.25 26,827,636.99
M² 29,050.00 2,208,381.00
II 229,177,359.49
Kg 32,000.00 #VALUE!
Unit 120,000.00 #VALUE!
Unit 24,000.00 #VALUE!
Unit 23,500.00 #VALUE!
Unit 23,000.00 #VALUE!
Unit 22,500.00 #VALUE!
Unit 22,000.00 #VALUE!
Unit 21,500.00 #VALUE!
Kg 14,300.00 #VALUE!
M² 78,982.50 #VALUE!
M² 93,658.00 #VALUE!
III 597,033,781.56
HARGA SATUAN
SAT SUB JUMLAH (Rp.)
(Rp.)
5 6 7
Unit 150,000,000.00 150,000,000.00
Unit 5,000,000.00 20,000,000.00
Unit 4,500,000.00 18,000,000.00
Unit 11,000,000.00 11,000,000.00
Unit 600,000.00 600,000.00
Unit 7,300,000.00 7,300,000.00
Unit 7,250,000.00 7,250,000.00
Paket 10,000,000.00 10,000,000.00
Unit 1,482,451.00 1,482,451.00
IV 225,632,451.00
KANIKAL ELEKTRIKAL 1,362,491,408.05
PN 10 % 136,249,140.80
KANIKAL + PPN 10 % 1,498,740,548.85
REKAPITULASI RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
PEKERJAAN : PEMBANGUNAN GEDUNG OPERASI (OK) DAN BERSALIN (VK)
DINAS / INSTANSI : RUMAH SAKIT UMUM DAERAH DR. AGOESDJAM
LOKASI : JL. MAYJEND D.I. PANJAITAN NO. 51 KABUPATEN KETAPANG
TAHUN ANGGARAN : 2018
1 2
A PEKERJAAN STRUKTUR GEDUNG
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PONDASI
III PEKERJAAN STRUKTUR
IV PEKERJAAN PLAT LANTAI
V PEKERJAAN TANGGA
VI PEKERJAAN ATAP
Sub Jumlah Pekerjaan Struktur Gedung
B PEKERJAAN STRUKTUR SELASAR DAN RAMP
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PONDASI
III PEKERJAAN STRUKTUR
IV PEKERJAAN PLAT LANTAI
V PEKERJAAN ATAP
Sub Jumlah Pekerjaan Struktur Selasar dan Ramp
C PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
II PEKERJAAN LANTAI
III PEKERJAAN PLAFON
IV PEKERJAAN PINTU DAN JENDELA
V PEKERJAAN SANITAIR
VI PEKERJAAN PENGECATAN
VII PEKERJAAN LAIN-LAIN
VIII ARSITEKTUR KHUSUS RUANG OK
IX ARSITEKTUR FASADE BANGUNAN
Sub Jumlah Pekerjaan Arsitektur
D PEKERJAAN MEKANIKAL ELEKTRIKAL
01 INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 1 & LANTAI 2
02 INSTALASI TATA UDARA / AC LANTAI 1 & 2
03 INSTALASI TELEPHONE LANTAI 1 & LANTAI 2
04 INSTALASI FIRE ALARM LANTAI 1 & LANTAI 2
05 INSTALASI TATA SUARA LANTAI 1 & LANTAI 2
06 INSTALASI KABEL WIFI LANTAI 1 & LANTAI 2
1 2
07 INSTALASI CCTV LANTAI 1 & LANTAI 2
08 AIR BEKAS, KOTOR DAN VENT LANTAI 1 & LANTAI 2
09 AIR BERSIH LANTAI 1 & LANTAI 2
10 AIR PANAS
11 PENANGGULANGAN KEBAKARAN LANTAI 1 & LANTAI 2
12 SALURAN AIR HUJAN
13 INSTALASI GAS MEDIS LANTAI 1 & LANTAI 2
1 2
14 PENYALUR PETIR
15 BED ELEVATOR
Sub Jumlah Pekerjaan Mekanikal Elektrikal
JUMLAH TOTAL
PPN 10 %
JUMLAH TOTAL + PPN 10 %
DIBULATKAN
DUA PULUH TIGA MILYAR TIGA RATUS EMPAT PULUH SEMBILAN JUTA D
TERBILANG :
LIMA PULUH DELAPAN RIBU RUPIAH
78,758,524.90
2,068,751,525.83
3,364,765,172.60
978,332,619.21
55,997,435.01
383,471,115.28
6,930,076,392.84
10,176,912.90
862,291,078.89
1,177,878,857.49
281,962,798.54
56,508,149.18
2,388,817,797.01
990,709,429.59
1,237,649,154.72
412,178,746.69
873,716,451.87
806,013,522.66
255,052,522.89
41,866,681.80
1,408,559,130.00
415,350,296.00
6,441,095,936.23
1,384,929,331.99
2,119,365,766.30
46,950,400.00
63,486,190.00
83,355,315.00
13,652,940.00
3
57,935,800.00
231,771,093.70
137,173,433.00
21,299,749.72
11,184,000.00
165,724,199.00
408,146,631.01
3
32,178,800.00
869,600,000.00
5,646,753,649.71
21,406,743,775.78
2,140,674,377.58
23,547,418,153.36
23,547,418,000.00
LUH TIGA MILYAR TIGA RATUS EMPAT PULUH SEMBILAN JUTA DELAPAN RATUS
ULUH DELAPAN RIBU RUPIAH
Mengetahui Oleh :
Kepala RSUD Dokter Agoesdjam
Kabupaten Ketapang
KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA
1 2 3 4 5
A. PEKERJAAN STRUKTUR GEDUNG
I PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank 2.2.1.4.a 170.20 M'
2 Pembongkaran 1.00 Lsm
3 Pagar Sementara 2.2.1.2.a 171.40 M'
4 Papan Nama Proyek 1.00 Lsm
Sub Jumlah I
II PEKERJAAN PONDASI
1 Pengadaan Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 702.00 Btg
450 -6 m
2 Pemancangan Mini Pile 25 x 25 K450 4,212.00 M'
3 Pembobokan Mini Pile 234.00 Titik
4 Galian Tanah Pondasi 2.3.1.1 128.74 M³
5 Urugan Pasir t = 10 cm 2.3.1.11 15.15 M³
6 Lantai Kerja t = 5 cm 4.1.1.4 7.57 M³
7 Poer Type P1
- Beton Ready Mix K-300 B. 13.i.2 1.26 M³
- Tulangan U32 4.1.1.17.b 137.28 Kg
- Bekisting Pondasi 4.1.1.20.a 8.40 M²
8 Poer Type P2
- Beton Ready Mix K-300 B. 13.i.2 7.81 M³
- Tulangan U32 4.1.1.17.b 666.78 Kg
- Bekisting Pondasi 4.1.1.20.a 29.61 M²
9 Poer Type P3
- Beton Ready Mix K-300 B. 13.i.2 1.57 M³
- Tulangan U32 4.1.1.17.b 105.83 Kg
- Bekisting Pondasi 4.1.1.20.a 3.99 M²
10 Poer Type P4
- Beton Ready Mix K-300 B. 13.i.2 1.68 M³
- Tulangan U32 4.1.1.17.b 157.45 Kg
- Bekisting Pondasi 4.1.1.20.a 4.34 M²
1 2 3 4 5
11 Poer Type P6
- Beton Ready Mix K-300 B. 13.i.2 9.98 M³
- Tulangan U32 4.1.1.17.b 652.08 Kg
- Bekisting Pondasi 4.1.1.20.a 21.56 M²
12 Poer Type P8
- Beton Ready Mix K-300 B. 13.i.2 14.81 M³
- Tulangan U32 4.1.1.17.b 892.79 Kg
- Bekisting Pondasi 4.1.1.20.a 25.76 M²
13 Poer Type P9
- Beton Ready Mix K-300 B. 13.i.2 29.62 M³
- Tulangan U32 4.1.1.17.b 1,785.57 Kg
- Bekisting Pondasi 4.1.1.20.a 51.52 M²
14 Poer Type P10
- Beton Ready Mix K-300 B. 13.i.2 39.28 M³
- Tulangan U32 4.1.1.17.b 2,266.98 Kg
- Bekisting Pondasi 4.1.1.20.a 59.92 M²
15 Kolom Pondasi K1 Uk. 45x45 cm
- Beton Ready Mix K-225 B. 13.f.2 4.25 M³
- Tulangan U32 4.1.1.17.b 1,722.01 Kg
- Tulangan U24 4.1.1.17.a 167.82 Kg
- Bekisting Pondasi 4.1.1.20.a 37.80 M²
16 Kolom Pondasi K2 Uk. 30x30 cm
- Beton Ready Mix K-225 B. 13.f.2 0.44 M³
- Tulangan U32 4.1.1.17.b 189.67 Kg
- Tulangan U24 4.1.1.17.a 25.07 Kg
- Bekisting Pondasi 4.1.1.20.a 5.88 M²
1 2 3 4 5
17 Kolom Pondasi K2 Uk. 20x40 cm (L)
- Beton Ready Mix K-225 B. 13.f.2 0.36 M³
- Tulangan U32 4.1.1.17.b 79.58 Kg
- Tulangan U24 4.1.1.17.a 8.58 Kg
- Bekisting Pondasi 4.1.1.20.a 1.92 M²
Struktur Bawah Lift :
1 Dinding Masif
- Beton Ready Mix K 225 t = 14 cm B. 13.f.2 2.52 M³
- Wiremesh 2xM7 4.1.1.19 150.29 Kg
- Bekisting Balok 4.1.1.23.b 36.04 M²
- Plesteran Dinding 4.4.2.4 36.04 M²
- Waterproofing Dinding A.4.7.1.10.f 36.04 M²
2 Plat Bawah Dudukan Lift
- Galian Tanah 2.3.1.1 5.41 M³
- Urugan Pasir tebal 10 cm 2.3.1.11 1.80 M³
- Lantai Kerja t = 5 cm 4.1.1.4 0.90 M³
- Beton Ready Mix K 225 t = 16 cm B. 13.f.2 2.88 M³
- Wiremesh 2xM7 4.1.1.19 150.29 Kg
- Plesteran Atas Plat 4.4.2.4 18.02 M²
- Waterproofing Lantai A.4.7.1.10.f 18.02 M²
Sub Jumlah II
III PEKERJAAN STRUKTUR
Struktur Lantai 1
1 Sloof Uk. 35x60 cm
- Beton Ready Mix K-225 B. 13.f.2 47.24 M³
- Tulangan U32 4.1.1.17.b 9,766.80 Kg
- Tulangan U24 4.1.1.17.a 1,888.72 Kg
- Bekisting Sloof 4.1.1.21.a 364.43 M²
2 Sloof Uk. 25x50 cm
- Beton Ready Mix K-225 B. 13.f.2 20.81 M³
- Tulangan U32 4.1.1.17.b 2,695.54 Kg
- Tulangan U24 4.1.1.17.a 712.87 Kg
- Bekisting Sloof 4.1.1.21.a 218.49 M²
3 Sloof Uk. 20x45 cm
- Beton Ready Mix K-225 B. 13.f.2 0.57 M³
- Tulangan U32 4.1.1.17.b 64.15 Kg
- Tulangan U24 4.1.1.17.a 23.97 Kg
- Bekisting Sloof 4.1.1.21.a 7.31 M²
3 Sloof Uk. 20x40 cm
- Beton Ready Mix K-225 B. 13.f.2 7.34 M³
- Tulangan U32 4.1.1.17.b 983.01 Kg
1 2 3 4 5
- Tulangan U24 4.1.1.17.a 322.74 Kg
- Bekisting Sloof 4.1.1.21.a 97.93 M²
4 Sloof Uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.71 M³
- Tulangan U32 4.1.1.17.b 100.11 Kg
- Tulangan U24 4.1.1.17.a 37.92 Kg
- Bekisting Sloof 4.1.1.21.a 11.89 M²
5 Tutup Kolong Uk.10x30 cm (blk.35/60)
- Beton Ready Mix K-225 B. 13.f.2 2.57 M³
- Wiremesh M7 4.1.1.19 142.74 Kg
- Bekisting Sloof 4.1.1.21.a 51.35 M²
- Plesteran Tutup Kolong Uk.10x30 cm (blk.35/60) 4.4.2.4 37.83 M²
6 Tutup Kolong Uk.10/30 (blk.25/50)
- Beton Ready Mix K-225 B. 13.f.2 0.65 M³
- Wiremesh M7 4.1.1.17.b 34.62 Kg
- Bekisting Sloof 4.1.1.17.a 12.92 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.25/50) 4.4.2.4 8.71 M²
7 Tutup Kolong Uk.10/50 (blk.20/40)
- Beton Ready Mix K-225 B. 13.f.2 1.54 M³
- Wiremesh M7 4.1.1.19 76.87 Kg
- Bekisting Sloof 4.1.1.21.a 30.73 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 18.44 M²
8 Kolom K1 Uk. 45x45 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 20.66 M³
- Tulangan U32 4.1.1.17.b 3,612.60 Kg
- Tulangan U24 4.1.1.17.a 700.91 Kg
- Bekisting Kolom 4.1.1.22 b 183.60 M²
1 2 3 4 5
9 Kolom K2 Uk. 30x30 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 2.59 M³
- Tulangan U32 4.1.1.17.b 454.75 Kg
- Tulangan U24 4.1.1.17.a 79.00 Kg
- Bekisting Kolom 4.1.1.22 b 34.56 M²
10 Kolom K3 Uk. 20x20 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 0.14 M³
- Tulangan U32 4.1.1.17.b 56.84 Kg
- Tulangan U24 4.1.1.17.a 5.93 Kg
- Bekisting Kolom 4.1.1.22 b 2.88 M²
11 Kolom K2 Uk. 20x40 cm (L) Lt.1
- Beton Ready Mix K-225 B. 13.f.2 0.96 M³
- Tulangan U32 4.1.1.17.b 166.74 Kg
- Tulangan U24 4.1.1.17.a 61.62 Kg
- Bekisting Kolom 4.1.1.22 b 9.60 M²
12 Kolom Praktis Uk.9x9 cm Lt.1
- Beton K175 4.1.1.4 6.50 M³
- Tulangan U24 4.1.1.17.a 1,620.76 Kg
- Bekisting 4.1.1.20.a 144.50 M²
13 Balok Praktis Uk.9x9 cm Lt.1 (dinding)
- Beton K175 4.1.1.4 0.47 M³
- Tulangan U24 4.1.1.17.a 115.98 Kg
- Bekisting 4.1.1.20.a 10.43 M²
Struktur Lantai 1
Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.325
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.94 M³
- Tulangan U32 4.1.1.17.b 779.08 Kg
- Tulangan U24 4.1.1.17.a 274.56 Kg
- Bekisting Balok 4.1.1.23.b 86.78 M²
2 List Plat Dack elv. 3.360
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 13.44 M³
- Wiremesh 2xM7 4.1.1.19 738.92 Kg
- Bekisting Lantai 4.1.1.24.b 156.58 M²
- Plesteran List Plat Dack elv. 3.360 4.4.2.4 279.93 M²
3 Balok Uk. 35x60 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 51.79 M³
- Tulangan U32 4.1.1.17.b 10,359.79 Kg
- Tulangan U24 4.1.1.17.a 2,070.46 Kg
- Bekisting Balok 4.1.1.23.b 399.52 M²
4 Balok Uk. 25x50 cm Lt.2
1 2 3 4 5
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 21.27 M³
- Tulangan U32 4.1.1.17.b 2,849.91 Kg
- Tulangan U24 4.1.1.17.a 728.52 Kg
- Bekisting Balok 4.1.1.23.b 223.29 M²
5 Balok Uk. 20x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.95 M³
- Tulangan U32 4.1.1.17.b 930.70 Kg
- Tulangan U24 4.1.1.17.a 305.30 Kg
- Bekisting Balok 4.1.1.23.b 92.63 M²
6 Balok Uk. 15x60 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.46 M³
- Tulangan U32 4.1.1.17.b 826.13 Kg
- Tulangan U24 4.1.1.17.a 295.43 Kg
- Bekisting Balok 4.1.1.23.b 99.07 M²
6 Balok Uk. 15x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.71 M³
- Tulangan U32 4.1.1.17.b 99.81 Kg
- Tulangan U24 4.1.1.17.a 37.81 Kg
- Bekisting Balok 4.1.1.23.b 11.85 M²
7 Kolom K1 Uk. 45x45 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 34.63 M³
- Tulangan U32 4.1.1.17.b 4,896.81 Kg
- Tulangan U24 4.1.1.17.a 1,154.96 Kg
- Bekisting Kolom 4.1.1.22 b 307.78 M²
1 2 3 4 5
8 Kolom K2 Uk. 30x30 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.48 M³
- Tulangan U32 4.1.1.17.b 454.75 Kg
- Tulangan U24 4.1.1.17.a 104.91 Kg
- Bekisting Kolom 4.1.1.22 b 46.37 M²
9 Kolom K3 Uk. 20x20 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.80 M³
- Tulangan U32 4.1.1.17.b 251.63 Kg
- Tulangan U24 4.1.1.17.a 32.42 Kg
- Bekisting Kolom 4.1.1.22 b 15.94 M²
10 Kolom K4 Uk. 15x15 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.66 M³
- Tulangan U32 4.1.1.17.b 677.30 Kg
- Tulangan U24 4.1.1.17.a 175.12 Kg
- Bekisting Kolom 4.1.1.22 b 48.75 M²
11 Kolom K2 Uk. 20x40 cm (L) Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.70 M³
- Tulangan U32 4.1.1.17.b 283.46 Kg
- Tulangan U24 4.1.1.17.a 112.79 Kg
- Bekisting Kolom 4.1.1.22 b 9.60 M²
12 Kolom Praktis Uk.9x9 cm Lt.2
- Beton K175 4.1.1.4 8.61 M³
- Tulangan U24 4.1.1.17.a 2,140.52 Kg
- Bekisting 4.1.1.20.a 191.27 M²
13 Balok Praktis Uk.9x9 cm Lt.2
- Beton K175 4.1.1.4 0.72 M³
- Tulangan U24 4.1.1.17.a 177.76 Kg
- Bekisting 4.1.1.20.a 15.98 M²
elv.4.500
14 Balok Uk. 15x40 cm elv.4.5
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.60 M³
- Tulangan U32 4.1.1.17.b 716.23 Kg
- Tulangan U24 4.1.1.17.a 260.94 Kg
- Bekisting Balok 4.1.1.23.b 82.46 M²
15 Kolom Praktis Uk.9x9 cm elv.4.5
- Beton K175 4.1.1.4 0.16 M³
- Tulangan U24 4.1.1.17.a 41.61 Kg
- Bekisting 4.1.1.20.a 3.60 M²
15 List Plat Dack elv. 4.5
- Beton Ready Mix K-225 menggunakan pompa B. 13.g.1 7.77 M³
- Wiremesh 2xM7 4.1.1.19 695.13 Kg
1 2 3 4 5
- Bekisting Lantai 4.1.1.24.b 100.36 M²
- Plesteran List Plat Dack elv. 4.5 4.4.2.4 139.04 M²
elv.7.2
16 Balok List dack Uk.20x40 elv.7.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.20 M³
- Tulangan U32 4.1.1.17.b 34.50 Kg
- Tulangan U24 4.1.1.17.a 9.06 Kg
- Bekisting Balok 4.1.1.23.b 2.63 M²
17 Balok List dack Uk.15x40 elv.7.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.21 M³
- Tulangan U32 4.1.1.17.b 675.96 Kg
- Tulangan U24 4.1.1.17.a 245.80 Kg
- Bekisting Balok 4.1.1.23.b 98.38 M²
Elv.7.60
18 Balok uk. 20x80 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 7.18 M³
- Tulangan U32 4.1.1.17.b 1,064.53 Kg
- Tulangan U24 4.1.1.17.a 218.23 Kg
- Bekisting Balok 4.1.1.23.b 51.32 M²
19 Balok uk. 25x50 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.86 M³
- Tulangan U32 4.1.1.17.b 125.69 Kg
- Tulangan U24 4.1.1.17.a 29.95 Kg
- Bekisting Balok 4.1.1.23.b 9.03 M²
1 2 3 4 5
20 Balok uk. 20x40 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.56 M³
- Tulangan U32 4.1.1.17.b 166.28 Kg
- Tulangan U24 4.1.1.17.a 51.91 Kg
- Bekisting Balok 4.1.1.23.b 19.56 M²
21 Plat Dack elv. 7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.67 M³
- Wiremesh 2xM7 4.1.1.19 556.28 Kg
- Bekisting Lantai 4.1.1.24.b 50.37 M²
- Plesteran Plat Dack elv. 7.60 4.4.2.4 50.37 M²
- Acian Plat Dack elv. 7.60 4.4.2.27 50.37 M²
- Waterproofing Plat Dack elv. 7.60 A.4.7.1.10.f 50.37 M²
Elv.8.00
21 Balok Praktis uk.9x9 cm Elv.8.00
- Beton K175 4.1.1.4 0.24 M³
- Tulangan U24 4.1.1.17.a 61.25 Kg
- Bekisting 4.1.1.20.a 5.34 M²
Elv.8.980
22 Balok Dack uk. 35x60 cm Elv.8.980
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 26.90 M³
- Tulangan U32 4.1.1.17.b 5,303.80 Kg
- Tulangan U24 4.1.1.17.a 1,075.82 Kg
- Bekisting Balok 4.1.1.23.b 207.50 M²
23 Balok Dack uk. 25x55 cm Elv.8.980
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 15.81 M³
- Tulangan U32 4.1.1.17.b 1,920.06 Kg
- Tulangan U24 4.1.1.17.a 518.53 Kg
- Bekisting Balok 4.1.1.23.b 161.58 M²
24 Balok Dack uk. 25x50 cm Elv.8.980
- Beton Ready Mix K-K-225 menggunakan pompa B. 13.f.1 13.52 M³
- Tulangan U32 4.1.1.17.b 1,752.25 Kg
- Tulangan U24 4.1.1.17.a 463.40 Kg
- Bekisting Balok 4.1.1.23.b 141.98 M²
25 Balok Dack uk. 20x45 cm Elv.8.980
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.95 M³
- Tulangan U32 4.1.1.17.b 209.38 Kg
- Tulangan U24 4.1.1.17.a 56.92 Kg
- Bekisting Balok 4.1.1.23.b 20.48 M²
26 Balok Dack uk. 20x40 cm Elv.8.980
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.83 M³
- Tulangan U32 4.1.1.17.b 108.67 Kg
1 2 3 4 5
- Tulangan U24 4.1.1.17.a 36.64 Kg
- Bekisting Balok 4.1.1.23.b 11.01 M²
27 Balok Dack uk. 15x40 cm Elv.8.980
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.75 M³
- Tulangan U32 4.1.1.17.b 666.02 Kg
- Tulangan U24 4.1.1.17.a 250.27 Kg
- Bekisting Balok 4.1.1.23.b 79.09 M²
27 Plat Dack elv. 9.90
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 62.12 M³
- Wiremesh 2xM7 4.1.1.19 5,180.81 Kg
- Bekisting Lantai 4.1.1.24.b 475.03 M²
- Plesteran Plat Dack elv. 9.8 4.4.2.4 950.06 M²
- Acian Plat Dack elv. 9.8 4.4.2.27 475.03 M²
- Waterproofing Plat Dack elv. 9.8 A.4.7.1.10.f 475.03 M²
Elv.10.50
28 Balok uk. 20x40 cm Elv.10.50
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 9.41 M³
- Tulangan U32 4.1.1.17.b 988.85 Kg
- Tulangan U24 4.1.1.17.a 310.08 Kg
- Bekisting Balok 4.1.1.23.b 117.60 M²
Elv.11.480
29 Balok uk. 20x45 cm Elv.11.480
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.93 M³
- Tulangan U32 4.1.1.17.b 372.48 Kg
- Tulangan U24 4.1.1.17.a 114.32 Kg
- Bekisting Balok 4.1.1.23.b 41.28 M²
1 2 3 4 5
30 Balok uk. 20x40 cm Elv.11.480
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.36 M³
- Tulangan U32 4.1.1.17.b 96.24 Kg
- Tulangan U24 4.1.1.17.a 12.35 Kg
- Bekisting Balok 4.1.1.23.b 4.54 M²
31 Balok uk. 15/40 cm Elv.11.480
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.49 M³
- Tulangan U32 4.1.1.17.b 68.84 Kg
- Tulangan U24 4.1.1.17.a 26.19 Kg
- Bekisting Balok 4.1.1.23.b 8.18 M²
32 Plat Dack elv. 11.480
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 5.11 M³
- Wiremesh 2xM7 4.1.1.19 426.17 Kg
- Bekisting Lantai 4.1.1.24.b 38.73 M²
- Plesteran Plat Dack elv. 11.480 4.4.2.4 77.46 M²
- Acian Plat Dack elv. 11.480 4.4.2.27 38.73 M²
- Waterproofing Plat Dack elv. 11.480 A.4.7.1.10.f 38.73 M²
Struktur Lantai 2
Sub Jumlah III
IV PEKERJAAN PLAT LANTAI
1 Plat Lantai 1
- Beton Ready Mix K-225 t =12 cm B. 13.f.2 110.43 M³
- Wiremesh 2xM7 4.1.1.19 7,674.80 Kg
- Bekisting Lantai 4.1.1.24.c 655.36 M²
2 Plat Lantai 2
- Beton Ready Mix K-225 t =12 cm menggunakan pompa B. 13.f.1 121.13 M³
- Wiremesh 2xM7 4.1.1.19 8,418.31 Kg
- Bekisting Lantai 4.1.1.24.b 744.41 M²
Sub Jumlah IV
V PEKERJAAN TANGGA
Tangga Type T1 (1 Unit)
1 Balok Bordes uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.16 M³
- Tulangan U32 4.1.1.17.b 25.26 Kg
- Tulangan U24 4.1.1.17.a 9.84 Kg
- Bekisting Balok 4.1.1.23.b 3.24 M²
- Plesteran Balok Bordes 15/40 4.4.2.4 3.24 M²
2 Plat Bordes
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³
- Tulangan U24 4.1.1.17.a 86.78 Kg
- Bekisting Balok 4.1.1.23.b 3.31 M²
1 2 3 4 5
- Plesteran Bawah Plat Bordes 4.4.2.4 3.31 M²
3 Plat Tangga
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 1.60 M³
- Tulangan U24 4.1.1.17.a 306.00 Kg
- Bekisting Plat 4.1.1.24.b 22.89 M²
- Plesteran Bawah Plat tangga 4.4.2.4 22.89 M²
4 Anak Tangga
- Beton Ready Mix K-225 B. 13.f.2 0.86 M³
- Wiremesh M7 4.1.1.19 172.64 Kg
- Bekisting 4.1.1.21.a 5.76 M²
Tangga Type T2 (1 Unit)
1 Balok Bordes uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.16 M³
- Tulangan U32 4.1.1.17.b 25.26 Kg
- Tulangan U24 4.1.1.17.a 9.84 Kg
- Bekisting Balok 4.1.1.23.b 3.24 M²
- Plesteran Balok Bordes 15/40 4.4.2.4 3.24 M²
2 Plat Bordes
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³
- Tulangan U24 4.1.1.17.a 86.78 Kg
- Bekisting Balok 4.1.1.23.b 6.40 M²
- Plesteran Bawah Bordes 4.4.2.4 6.40 M²
3 Plat Tangga
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 2.07 M³
- Tulangan U24 4.1.1.17.a 394.96 Kg
- Bekisting Plat 4.1.1.24.b 29.60 M²
- Plesteran Bawah Plat tangga 4.4.2.4 29.60 M²
1 2 3 4 5
4 Anak Tangga
- Beton Ready Mix K-225 B. 13.f.2 1.12 M³
- Wiremesh M7 4.1.1.19 223.28 Kg
- Bekisting 4.1.1.21.a 7.45 M²
Sub Jumlah V
VI PEKERJAAN ATAP
1 Rangka Atap Baja Ringan Zincallume 8.1.1.3. 892.22 M2
2 Atap Zincallume Color t =0,35 mm A.4.5.2.41.b 892.22 M2
3 Prabung Atap Zincallume A.4.5.2.42.a 64.20 M
4 List Plank Woodplak 2 lps 8.1.1.4. 117.25 M
Sub Jumlah VI
JUMLAH TOTAL PEKERJAAN STRUKTUR GEDUNG
B PEKERJAAN STRUKTUR SELASAR DAN RAMP
I PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank 2.2.1.4.a 155.40 M'
Sub Jumlah I
II PEKERJAAN PONDASI
1 Pengadaan Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, 8 D U&B 291.00 Btg
13, ø 6 K 450 -6 m
2 Pemancangan Mini Pile 25 x 25 K450 1,746.00 M'
3 Pembobokan Mini Pile 97.00 Titik
4 Galian Tanah Pondasi 2.3.1.1 50.76 M³
5 Urugan Pasir t = 10 cm 2.3.1.11 5.97 M³
6 Lantai Kerja t = 5 cm 4.1.1.4 2.99 M³
7 Poer Type P1
- Beton Ready Mix K-300 B. 13.i.2 1.36 M³
- Tulangan U32 4.1.1.17.b 148.27 Kg
- Bekisting Pondasi 4.1.1.20.a 9.07 M²
8 Poer Type P2
- Beton Ready Mix K-300 B. 13.i.2 32.03 M³
- Tulangan U32 4.1.1.17.b 2,733.78 Kg
- Bekisting Pondasi 4.1.1.20.a 121.40 M²
9 Poer Type P3
- Beton Ready Mix K-300 B. 13.i.2 4.23 M³
- Tulangan U32 4.1.1.17.b 285.73 Kg
- Bekisting Pondasi 4.1.1.20.a 10.77 M²
10 Kolom Pondasi K2 Uk. 30x30 cm
- Beton Ready Mix K-225 B. 13.f.2 2.84 M³
- Tulangan U32 4.1.1.17.b 1,219.30 Kg
- Tulangan U24 4.1.1.17.a 161.16 Kg
- Bekisting Pondasi 4.1.1.20.a 37.80 M²
1 2 3 4 5
Sub Jumlah II
III PEKERJAAN STRUKTUR
Struktur Lantai 1
1 Sloof Uk. 25x55 cm
- Beton Ready Mix K-225 B. 13.f.2 6.39 M³
- Tulangan U32 4.1.1.17.b 773.08 Kg
- Tulangan U24 4.1.1.17.a 209.80 Kg
- Bekisting Sloof 4.1.1.21.a 65.30 M²
2 Sloof Uk. 25x50 cm
- Beton Ready Mix K-225 B. 13.f.2 1.33 M³
- Tulangan U32 4.1.1.17.b 186.83 Kg
- Tulangan U24 4.1.1.17.a 45.83 Kg
- Bekisting Sloof 4.1.1.21.a 13.92 M²
3 Sloof Uk. 20x40 cm
- Beton Ready Mix K-225 B. 13.f.2 10.24 M³
- Tulangan U32 4.1.1.17.b 1,447.84 Kg
- Tulangan U24 4.1.1.17.a 449.68 Kg
- Bekisting Sloof 4.1.1.21.a 136.51 M²
4 Tutup Kolong Uk. 10x45 (blk.25/55)
- Beton Ready Mix K-225 B. 13.f.2 2.59 M³
- Wiremesh M7 4.1.1.19 97.31 Kg
- Bekisting Sloof 4.1.1.21.a 51.87 M²
- Plesteran Tutup Kolong Uk. 10x35 (blk.25/55) 4.4.2.4 33.66 M²
1 2 3 4 5
5 Tutup Kolong Uk. 10x40 (blk.25/50)
- Beton Ready Mix K-225 B. 13.f.2 0.53 M³
- Wiremesh M7 4.1.1.19 27.65 Kg
- Bekisting Sloof 4.1.1.21.a 10.61 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 7.40 M²
6 Tutup Kolong Uk.10/50 (blk.20/40)
- Beton Ready Mix K-225 B. 13.f.2 2.87 M³
- Wiremesh M7 4.1.1.19 143.76 Kg
- Bekisting Sloof 4.1.1.21.a 57.46 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 34.48 M²
7 Kolom K2 Uk. 30x30 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 14.54 M³
- Tulangan U32 4.1.1.17.b 2,415.87 Kg
- Tulangan U24 4.1.1.17.a 442.07 Kg
- Bekisting Kolom 4.1.1.22 b 193.80 M²
Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.360
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 5.00 M³
- Tulangan U32 4.1.1.17.b 571.89 Kg
- Tulangan U24 4.1.1.17.a 197.97 Kg
- Bekisting Balok 4.1.1.23.b 62.55 M²
2 List Plat Dack elv. 3.360
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 7.67 M³
- Wiremesh 2xM7 4.1.1.19 584.98 Kg
- Bekisting Lantai 4.1.1.24.b 94.21 M²
- Plesteran List Plat Dack elv. 3.360 4.4.2.4 162.12 M²
3 Balok Uk. 25x55 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.25 M³
- Tulangan U32 4.1.1.17.b 773.08 Kg
- Tulangan U24 4.1.1.17.a 205.41 Kg
- Bekisting Balok 4.1.1.23.b 63.93 M²
4 Balok Uk. 20x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 26.32 M³
- Tulangan U32 4.1.1.17.b 3,576.49 Kg
- Tulangan U24 4.1.1.17.a 1,110.06 Kg
- Bekisting Balok 4.1.1.23.b 330.34 M²
5 Kolom K2 Uk. 30x30 cm (elv.4.00-8.00) Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 14.22 M³
- Tulangan U32 4.1.1.17.b 2,197.97 Kg
- Tulangan U24 4.1.1.17.a 431.87 Kg
- Bekisting Kolom 4.1.1.22 b 189.60 M²
1 2 3 4 5
Elv.7.60
6 Balok uk. 20x80 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 13.98 M³
- Tulangan U32 4.1.1.17.b 2,028.43 Kg
- Tulangan U24 4.1.1.17.a 423.51 Kg
- Bekisting Balok 4.1.1.23.b 99.89 M²
7 Balok uk. 25x55 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.03 M³
- Tulangan U32 4.1.1.17.b 124.30 Kg
- Tulangan U24 4.1.1.17.a 34.06 Kg
- Bekisting Balok 4.1.1.23.b 10.49 M²
8 Balok uk. 20x40 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 8.51 M³
- Tulangan U32 4.1.1.17.b 906.03 Kg
- Tulangan U24 4.1.1.17.a 280.40 Kg
- Bekisting Balok 4.1.1.23.b 106.36 M²
9 Plat Dack elv. 7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 22.80 M³
- Wiremesh 2xM7 4.1.1.19 1,901.52 Kg
- Bekisting Lantai 4.1.1.24.b 176.26 M²
- Plesteran Plat Dack elv.7.60 4.4.2.4 176.26 M²
- Acian Plat Dack elv. 7.60 4.4.2.27 176.26 M²
- Waterproofing Plat Dack elv. 7.60 A.4.7.1.10.f 176.26 M²
1 2 3 4 5
Elv.7.95
10 Balok Uk. 20x45 elv.6.8
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.79 M³
- Tulangan U32 4.1.1.17.b 84.13 Kg
- Tulangan U24 4.1.1.17.a 23.29 Kg
- Bekisting Balok 4.1.1.23.b 8.32 M²
11 Balok Uk. 20x40 elv.6.8
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 2.88 M³
- Tulangan U32 4.1.1.17.b 396.01 Kg
- Tulangan U24 4.1.1.17.a 126.51 Kg
- Bekisting Balok 4.1.1.23.b 38.34 M²
Elv.8.00
12 Kolom Praktis Uk.9x9 cm elv.8.00
- Beton K175 4.1.1.4 0.08 M³
- Tulangan U24 4.1.1.17.a 20.73 Kg
- Bekisting 4.1.1.20.a 1.73 M²
13 Balok Praktis Uk.9x9 cm elv.8.00
- Beton K175 4.1.1.4 0.55 M³
- Tulangan U24 4.1.1.17.a 141.57 Kg
- Bekisting 4.1.1.20.a 12.73 M²
14 List & Plat Dack elv. 8.00
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 14.78 M³
- Wiremesh 2xM7 4.1.1.19 1,121.53 Kg
- Bekisting Lantai 4.1.1.24.b 122.91 M²
- Plesteran List Plat Dack 4.4.2.4 268.95 M²
Sub Jumlah III
IV PEKERJAAN PLAT LANTAI
1 Plat Lantai 1
- Beton Ready Mix K-225 t = 10 cm B. 13.f.2 29.66 M³
- Wiremesh 2xM7 4.1.1.19 2,473.98 Kg
- Bekisting Lantai 4.1.1.24.c 246.14 M²
2 Plat Lantai 2
- Beton Ready Mix K-225 t = 10 cm menggunakan pompa B. 13.f.1 29.66 M³
- Wiremesh 2xM7 4.1.1.19 2,473.98 Kg
- Bekisting Lantai 4.1.1.24.b 200.98 M²
Sub Jumlah IV
V PEKERJAAN ATAP
1 Rangka Atap Baja Ringan Zincallume 8.1.1.3. 111.72 M2
2 Atap Zincallume Color t =0,35 mm A.4.5.2.41.b 111.72 M2
3 Prabung Atap Zincallume A.4.5.2.42.a 27.46 M
4 List Plank Woodplak 2 lps 8.1.1.4. 54.80 M
1 2 3 4 5
Sub Jumlah V
JUMLAH TOTAL PEKERJAAN STRUKTUR SELASAR DAN RAMP
C PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
A Lantai 1
1 Pas. Dinding Batako A.4.4.1.19.a 1,224.12 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 2,351.61 m2
3 Pas. Dinding Keramik 20x40 Cm A.4.4.3.54.a 310.53 m2
4 Pas. Dinding Wastafel Keramik 30x30 Motif A.4.4.3.35.a 9.18 m2
5 Pas. Dinding Partisi Cubical U&B 2.00 Unit
B Lantai 2
1 Pas. Dinding Batako A.4.4.1.19.a 1,158.21 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 1,946.91 m2
3 Pas. Dinding Keramik 20x40 Cm A.4.4.3.54.a 127.30 m2
4 Pas. Dinding Wastafel Keramik 30x30 Motif A.4.4.3.35.a 6.20 m2
C Lantai Atap
1 Pas. Dinding Batako A.4.4.1.19.a 277.45 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 554.90 m2
1 2 3 4 5
IIPEKERJAAN LANTAI
A Lantai 1
1 Pas. Lantai Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 329.65 m2
2 Pas. Lantai Keramik 60x60 Cm Unpolised Tekstur Kasar Warna Gelap A.4.4.3.34.b 110.02 m2
3 Pas. Lantai Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 16.56 m2
4 Pas. Lantai Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 605.17 m2
5 Pas. Lantai Keramik 30x30 Cm Polised A.4.4.3.35.a 142.28 m2
6 Pas. Lantai Keramik 30x30 Cm Unpolised A.4.4.3.35.a 60.36 m2
7 Pas. Lantai Tangga
a. Pas. Lantai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 43.93 m2
b. Stepnosing A.4.4.3.41 84.00 m'
8 Pas. Hospital Plint A.4.4.3.21 473.25 m'
B Lantai 2
1 Pas. Lantai Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 275.09 m2
2 Pas. Lantai Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 3.60 m2
3 Pas. Lantai Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 93.64 m2
4 Pas. Lantai Keramik 30x30 Cm Polised A.4.4.3.35.a 132.95 m2
5 Pas. Lantai Keramik 30x30 Cm Unpolised A.4.4.3.35.a 21.01 m2
6 Pas. Lantai Vinyl Homogeneous Heavy Duty Khusus R.OK A.4.4.3.59.a 649.61 m2
7 Pas. Lantai Tangga
a. Pas. Lantai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 24.35 m2
b. Stepnosing A.4.4.3.41 46.56 m'
8 Pas. Hospital Plint A.4.4.3.21 584.47 m'
Sub Jumlah II
III PEKERJAAN PLAFON
A Lantai 1
1 Pas. Plafond Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 1,142.13 m2
2 Pas. Plafond GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 59.51 m2
B Lantai 2
1 Pas. Plafond Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 985.18 m2
2 Pas. Plafond GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 20.45 m2
Sub Jumlah III
IV PEKERJAAN PINTU DAN JENDELA
A Lantai 1
Pintu :
1 PU1 234x250 cm (Kaca Tempered Frameless 12mm) U&B 2.00 Unit
- Pas. ACP Gawang U&B 65.41 m2
1 2 3 4 5
1 2 3 4 5
5 P2 87,5x270 cm 13.00 Unit
- Kusen A.4.2.1.11 92.95 m'
- Daun Pintu A.4.6.1.8.a 25.02 m2
- Engsel Pintu A.4.6.2.5 52.00 Set
- Lever Handle A.4.6.2.11.a 13.00 Set
- Kunci lockcase A.4.6.2.1.a 13.00 Set
- Door Stoper A.4.6.2.13 13.00 Set
- Door Closer A.4.6.2.10 13.00 Set
- Kaca 5 mm A.4.6.2.17 5.20 m2
Jendela :
1 2 3 4 5
1 J1 360x220 cm 6.00 Unit
- Kusen A.4.2.1.11 152.40 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 10.52 m2
- Kaca 5 mm A.4.6.2.17 33.82 m2
- Casement Handle A.4.6.2.11.b 12.00 Set
- Friction Stay A.4.6.2.9 24.00 Set
1 2 3 4 5
B Lantai 2
Pintu :
1 PU1 234x250 cm (Kaca Tempered Frameless 12mm) U&B 1.00 Unit
- Pas. ACP Gawang U&B 32.70 m2
1 2 3 4 5
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 2.00 Set
- Door Closer A.4.6.2.10 2.00 Set
- Kaca 5 mm A.4.6.2.17 0.80 m2
1 2 3 4 5
6 P6 77,5x220 cm 1.00 Unit
- Kusen A.4.2.1.11 5.17 m'
- Daun Pintu A.4.6.1.8.a 1.70 m2
- Engsel Pintu A.4.6.2.5 4.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set
- Door Closer A.4.6.2.10 1.00 Set
1 2 3 4 5
- Daun Pintu A.4.6.1.8.a 5.59 m2
- Engsel Pintu A.4.6.2.5 12.00 Set
- Lever Handle A.4.6.2.11.a 4.00 Set
- Kunci lockcase A.4.6.2.1.a 4.00 Set
- Door Stoper A.4.6.2.13 4.00 Set
Jendela :
1 J1 360x220 cm 19.00 Unit
- Kusen A.4.2.1.11 482.60 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 33.33 m2
- Kaca 5 mm A.4.6.2.17 107.11 m2
- Casement Handle A.4.6.2.11.b 38.00 Set
- Friction Stay A.4.6.2.9 76.00 Set
1 2 3 4 5
1 2 3 4 5
C Lantai Atap
Pintu :
1 P7 97,5x220 cm 3.00 Unit
- Kusen A.4.2.1.11 16.12 m'
- Daun Pintu A.4.6.1.8.a 6.43 m2
- Engsel Pintu A.4.6.2.5 12.00 Set
- Lever Handle A.4.6.2.11.a 3.00 Set
- Kunci lockcase A.4.6.2.1.a 3.00 Set
- Door Stoper A.4.6.2.13 3.00 Set
- Door Closer A.4.6.2.10 3.00 Set
Sub Jumlah IV
V PEKERJAAN SANITAIR
A Lantai 1
1 Pas. Closet Duduk tipe 1 A.5.1.1.1 14.00 set
2 Pas. Shower Spray A.5.1.1.19.a 14.00 set
3 Pas. Hand Shower A.5.1.1.19.c 4.00 set
4 Pas. Floor Drain A.5.1.1.14 16.00 set
5 Pas. Wastafel wall hung tipe 1 A.5.1.1.5 4.00 set
6 Pas. Wastafel wall hung tipe 2 A.5.1.1.5.a 21.00 set
7 Pas. Tempat Cuci Bayi A.5.1.1.5.b 6.00 set
8 Pas. Sink 1 Lubang dengan Petirasan A.5.1.1.12 1.00 set
9 Pas. Keran Pantry A.5.1.1.19 1.00 set
10 Pas. Grab bar U&B 12.00 set
11 Pas. Grab bar Difable U&B 4.00 set
12 Pas. Spoel Hoek A.5.1.1.1.a 1.00 set
1 2 3 4 5
13 Pas. Slob Sink A.5.1.1.1.a 2.00 set
14 Pas. Scrub Up Sink Double Bay 1.00 set
- Konstruksi / Bahan Body
- Plat untuk pengoperasian kran air dan sabun dengan manual (pedal / lutut) : Plat SS 304 1.0 mm HL
- Ukuran : 1400-1800(w)x600(t)x1800(h) mm
- Power Supply : 220V AC
- Indikator Unit : Power Lamp / Heather Lamp
- Lampu UV : 2 x 30 W Unites 89 PM
- Ballast UV : 2 x 30 W/24V
- Automatic Sensor Soup : 2 Pcs Fotex CDR - 10X
- Bath Spout : 2 Pcs Stuchi Spol
- Automatic Sensor Water : 2 Pcs Fotex CDR - 30X
- Heater : 1 Pcs 1000 W AC 220V, suhu max 45° C
- Tube : 1 Pcs Pipa SS 304 Ø 4"
- Solenoid Valve : 2 Pcs Tipe DW-15 24V DC
- Hour Meter : 1 Pcs 24V DC
- Housing Filter : 2 Pcs
- Selang Flexible : SS alpi
- Adaptor : 1 Pcs 24V DC
15 Pas. Kaca Cermin 5 mm ex. Lokal A.4.6.2.20 19.23 m2
16 Pas. Meja Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.81 m3
B Lantai 2
1 Pas. Closet Duduk tipe 1 A.5.1.1.1 4.00 set
2 Pas. Shower Spray A.5.1.1.19.a 4.00 set
3 Pas. Fix Shower A.5.1.1.19.b 2.00 set
4 Pas. Keran A.5.1.1.19 2.00 set
5 Pas. Floor Drain A.5.1.1.14 9.00 set
6 Pas. Wastafel wall hung tipe 1 A.5.1.1.5 1.00 set
7 Pas. Wastafel wall hung tipe 2 A.5.1.1.5.a 6.00 set
8 Pas. Sink 1 Lubang dengan Petirasan A.5.1.1.12 2.00 set
9 Pas. Keran Pantry A.5.1.1.19 2.00 set
10 Pas. Grab bar U&B 1.00 set
11 Pas. Spoel Hoek A.5.1.1.1.a 1.00 set
12 Pas. Slob Sink A.5.1.1.1.a 2.00 set
13 Pas. Scrub Up Sink Double Bay 4.00 set
- Konstruksi / Bahan Body
- Plat untuk pengoperasian kran air dan sabun dengan manual (pedal / lutut) : Plat SS 304 1.0 mm HL
- Ukuran : 1400-1800(w)x600(t)x1800(h) mm
- Power Supply : 220V AC
- Indikator Unit : Power Lamp / Heather Lamp
1 2 3 4 5
- Lampu UV : 2 x 30 W Unites 89 PM
- Ballast UV : 2 x 30 W/24V
- Automatic Sensor Soup : 2 Pcs Fotex CDR - 10X
- Bath Spout : 2 Pcs Stuchi Spol
- Automatic Sensor Water : 2 Pcs Fotex CDR - 30X
- Heater : 1 Pcs 1000 W AC 220V, suhu max 45° C
- Tube : 1 Pcs Pipa SS 304 Ø 4"
- Solenoid Valve : 2 Pcs Tipe DW-15 24V DC
- Hour Meter : 1 Pcs 24V DC
- Housing Filter : 2 Pcs
- Selang Flexible : SS alpi
- Adaptor : 1 Pcs 24V DC
Pas. Kaca Cermin 5 mm ex. Lokal A.4.6.2.20 3.51 m2
Pas. Meja Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.35 m3
Sub Jumlah V
VI PEKERJAAN PENGECATAN
A Lantai 1
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 426.25 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 1,333.88 m2
3 Cat Plafond A.4.7.1.10.a 761.97 m2
B Lantai 2
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 577.61 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 1,819.16 m2
3 Cat Plafond A.4.7.1.10.a 730.55 m2
1 2 3 4 5
C Lantai Atap
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 645.64 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 178.69 m2
B Lantai 2
1 Pekerjaan Tangga :
a. Pas. Handrail dan Railling ( Void ) A.4.2.1.20.a 26.12 m2
Sub Jumlah VII
VIII
ARSITEKTUR KHUSUS RUANG OK
1 Wall Medical Insulated Panel EPS, t. 75 mm, Antibacterial 250.63 m2
2 Ceiling Medical Insulated Panel EPS, t. 75 mm, Antibacterial 119.38 m2
3 Medical Plenum / RAG, tidak termasuk grille 12.00 Unit
4 Operating Timer (jam, countdown, temp, humidity), recessed on wall 3.00 Unit
- Ukuran : 850 (w) x 400 (h) x 350 (t) mm
- Running Text : Dot Matrix
- Sensor : Sesirion
- Daya : 40 W
5 Film Viewer, recessed on wall 3.00 Unit
- Ukuran : 800 (w) x 500 (h) x 45 (t) mm
- Kapasitas : 2 Film
- Frame dan Body : SS 304 HL 1.2 mm
- Lampu : LED Module 3 mata
- Pengaturan Kecerahan : Dimme / Rotary Switch
- Daya : DC 165 W / 12 V / 8,3 A
6 Passbox SS Mirror 304, recessed on wall 8.00 Unit
- Ukuran Luar : 700 (w) x 750 (h) x 600 (t) mm
- Bahan : SS SUS 304 Mirror, 1.2 mm
- System : Interlock Magnetic
- Pintu Kedua Sisi Pakai Kaca Clear 6 mm
- Daya : DC 220 W / 12 V / 4,2 A
1 2 3 4 5
7 Single Swing Door Manual 2.00 Unit
- Ukuran Opening : 900 (w) x 2200 (h) mm
- Auto Bottom Seal
- Observation Glass : 400 (w) x 600 (h) mm, clear glass 8 mm
- Accessoris : Engsel, Lockset & Handle
8 Single Sliding Door Full Hermatic 3.00 Unit
- Ukuran Opening : 1600 (w) x 2200 (h) mm
- System Automatic
- Observation Glass : 400 (w) x 600 (h) mm, clear glass 8 mm
- Accessoris : Trackrell; Roda; Frame Door & Kusen
9 Single Sliding Door Full Hermatic 1.00 Unit
- Ukuran Opening : 1600 (w) x 2200 (h) mm
- System Automatic
- Accessoris : Trackrell; Roda; Frame Door & Kusen
Sub Jumlah VIII
IX ARSITEKTUR FASADE BANGUNAN
1 Pas. ACP Flat Tebal 0.3 mm + Pemasangan U&B 313.39 m2
2 Pas. Jalusi Aluminium U&B 81.43 m2
3 Pas. Signage :
- INSTALASI BERSALIN 975.80 cm
- INSTALASI BEDAH SENTRAL 1,205.40 cm
Sub Jumlah IX
JUMLAH TOTAL PEKERJAAN ARSITEKTUR
1 2 3 4 5
D PEKERJAAN MEKANIKAL ELEKTRIKAL
01 Instalasi Penerangan dan Kotak Kontak Lantai 1 & Lantai 2
Kabel NYM 2 x 2.5 mm² dalam High Impact conduit dia. 20 mm
lantai 1
1 Instalasi penerangan 161.00 titik
2 Downlight LED Inbow 6 W 4.00 bh
3 Downlight LED Inbow 10 W 45.00 bh
4 Downlight LED Inbow 10 W + Nicad Batery 2.00 bh
5 Downlight LED Inbow 13 W 97.00 bh
6 Downlight LED Inbow 13 W+ Nicad Batery 8.00 bh
7 Lampu Led Baret Circular 10 W 5.00 bh
8 Sakelar Ganda 34.00 bh
9 Sakelar Tunggal 27.00 bh
10 Lampu Exit + baterai 2.00 bh
Kabel NYM 3x2.5 mm² dalam High Impact conduit dia. 20 mm
11 Instalasi kotak kontak 1p 78.00 titik
12 Outlet kotak kontak dinding 1p 77.00 bh
13 Outlet kotak kontak dinding 1p 3 lubang 1.00 bh
Lantai 2
14 Instalasi penerangan 213.00 titik
15 Downlight LED Inbow 6 W 10.00 bh
16 Downlight LED Inbow 10 W 53.00 bh
17 Downlight LED Inbow 10 W + Nicad Batery 5.00 bh
18 Downlight LED Inbow 13 W 55.00 bh
19 Downlight LED Inbow 13 W+ Nicad Batery 6.00 bh
20 Lampu Led Baret Circular 10 W 2.00 bh
21 Lampu Kamar Operasi TL LED (Recess Mounted) 45 Watt Inbow 76.00 bh
22 Lampu indikator ruang ok 6.00 bh
23 Sakelar Ganda 34.00 bh
24 Sakelar Tunggal 13.00 bh
25 Lampu Exit + baterai 2.00 bh
Kabel NYM 3x2.5 mm² dalam High Impact conduit dia. 20 mm
26 Instalasi kotak kontak 1p 86.00 titik
27 Instalasi Listrik Pass Box 8.00 titik
28 Instalasi Listrik Door full Hermatik 3.00 titik
29 Instalasi Listrik operating timer 3.00 titik
30 Outlet kotak kontak dinding 1p 25.00 bh
31 Stop kontak Ruang operasi 20 ampere 36.00 bh
32 Outlet kotak kontak dinding 1p 3 lubang 15.00 bh
33 Outlet kotak kontak lantai 10.00 bh
Lantai Koridor luar
1 2 3 4 5
34 Instalasi penerangan 68.00 titik
35 Lampu Led Baret Circular 10 W 67.00 bh
36 Lampu Led Baret Circular 10 W + Nicad Batery 1.00 bh
37 Sakelar Ganda 5.00 bh
BED HEAD R. Tindakan
38 Bed Head Finishing aluminium c/w 1 sakelar tunggal, lampu TL LED 2 x 10 Watt, 5 Outlet 11.00 unit
39 Instalasi kotak kontak Bed Head (1 kabel Power untuk 3 kotak kontak) 11.00 titik
40 Instalasi Power lampu Bed Head 11.00 titik
Pekerjaan Grounding Listrik
41 BC 50 mm 52.00 meter
42 Sumuran grounding arus kuat tahanan maksimal 2 ohm 2.00 unit
43 Sumuran grounding Lift arus kuat tahanan maksimal 1 ohm 1.00 unit
Pekerjaan Grounding medis
44 BC 25 mm Dari P.P Ok ke pentanahan 85.00 meter
45 BC 50 mm 36.00 meter
46 Sumuran grounding trafo isolasi tahanan maksimal 0,2 ohm 1.00 unit
47 Sumuran grounding perangkat medis Cath Lab tahanan maksimal 0,5 ohm 1.00 unit
Panel dan Kabel Feeder
Panel
1 2 3 4 5
48 SUB DISTRIBUSI PANEL OK & VK (Wall mounted)
Box Panel Ukuran 60 x 80 x 20 cm 1.00 bh
MCCB 320A, 36kA, 3P 1.00 bh
MCCB 250A, 18kA, 3P 1.00 bh
MCCB 60A, 7,5kA, 3P 2.00 bh
MCCB 50A, 7,5kA, 3P 2.00 bh
MCCB 40A, 7,5kA, 3P 1.00 bh
MCB 10A, 3P, 10 kA 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Surge Arester tipe 1 3P+N 1.00 bh
Skun kabel + Material bantu 1.00 lot
49 SUB DISTRIBUSI PANEL UPS OK (Wall mounted)
Box Panel Ukuran 60 x 80 x 20 cm 1.00 bh
MCCB 320A, 36kA, 3P 1.00 bh
MCCB 125A, 18kA, 3P 1.00 bh
MCB 10A, 3P, 10 kA 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Surge Arester tipe 1 3P+N 1.00 bh
Skun kabel + Material bantu 1.00 lot
50 POWER PANEL UPS OK (Wall mounted)
Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 125A, 18kA, 3P 1.00 bh
MCB 25A, 6kA, 3P 1.00 bh
MCB 40A, 4,5kA, 1P 5.00 bh
MCB 16A, 4,5kA, 1P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
1 2 3 4 5
51 POWER PANEL OK 2 (Wall mounted) 1.00 Lot
MCB 40A, 4,5kA, 2P 2.00 bh
MCB 16A, 4,5kA, 2P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
Isolation Transformer 5KVA 1.00 lot
52 POWER PANEL OK 3 (Wall mounted) 1.00 Lot
MCB 40A, 4,5kA, 2P 2.00 bh
MCB 16A, 4,5kA, 2P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 1.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
Isolation Transformer 5KVA 1.00 lot
1 2 3 4 5
53 POWER PANEL OK 4 (Wall mounted) 1.00 Lot
MCB 40A, 4,5kA, 2P 2.00 bh
MCB 16A, 4,5kA, 2P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 1.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
Isolation Transformer 5KVA 1.00 lot
54 POWER PANEL OK 5 (Wall mounted) 1.00 Lot
MCB 40A, 4,5kA, 2P 2.00 bh
MCB 16A, 4,5kA, 2P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 1.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
Isolation Transformer 5KVA 1.00 lot
55 POWER PANEL OK 6 (Wall mounted) 1.00 Lot
MCB 40A, 4,5kA, 2P 2.00 bh
MCB 16A, 4,5kA, 2P 5.00 bh
MCB 6A, 4,5kA, 1P 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 1.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
Isolation Transformer 5KVA 1.00 lot
1 2 3 4 5
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
57 POWER PANEL LANTAI 2 (Wall mounted)
Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 40A, 7,5kA, 3P 1.00 bh
MCCB 20A, 4,5kA, 1P 2.00 bh
MCB 16A, 4,5kA, 1P 9.00 bh
MCB 4A, 4,5kA, 1P 15.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
1 2 3 4 5
58 POWER PANEL AC 1 (Wall mounted)
Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 60A, 7,5kA, 3P 1.00 bh
MCCB 10A, 4,5kA, 1P 11.00 bh
MCB 16A, 4,5kA, 1P 7.00 bh
MCB 6A, 4,5kA, 1P 7.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
59 POWER PANEL AC 2 (Wall mounted)
Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 40A, 7,5kA, 3P 1.00 bh
MCCB 10A, 4,5kA, 1P 3.00 bh
MCB 16A, 4,5kA, 1P 11.00 bh
MCB 6A, 4,5kA, 1P 4.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
60 POWER PANEL AC OK (OUTDOOR TYPE)
Box Panel Ukuran 60 x 1200 x 25 cm 1.00 bh
MCCB 250A, 18kA, 3P 1.00 bh
MCCB 60A, 10kA, 3P 6.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
phase failure 1.00 bh
Skun kabel + Material bantu 1.00 lot
61 Panel kontrol pompa air bersih transfer 1.00 bh
62 Panel kontrol pompa Booster 1.00 bh
Kabel Feeder
63 Kabel NYFGBY 4x185 mm² (SDP IPSRS - SDP OK & VK) 138.00 m'
64 Kabel NYFGBY 4x185 mm² (SDP IPSRS - SDP UPS OK) 158.00 m'
65 Kabel NYY 4x95 mm² (SDP OK - UPS 120 KVA Cath lab) 17.00 m'
1 2 3 4 5
66 Kabel NYY 4x95 mm² (UPS 120 KVA Cath Lab -Panel Main swicth- Mesin Cath Lab)
67 Kabel NYY 4x50 mm² (SDP OK - PP UPS OK) 13.00 m'
68 Kabel NYY 4x50 mm² (PP UPS OK - UPS OK 60 KVA) 18.00 m'
69 Kabel NYY 3x10 mm² (PP UPS OK - PP OK 2) 37.00 m'
70 Kabel NYY 3x10 mm² (PP UPS OK - PP OK 3) 38.00 m'
71 Kabel NYY 3x10 mm² (PP UPS OK - PP OK 4) 55.00 m'
72 Kabel NYY 3x10 mm² (PP UPS OK - PP OK 5) 56.00 m'
73 Kabel NYY 3x10 mm² (PP UPS OK - PP OK 6) 66.00 m'
74 Kabel NYY 4x16 mm² (SDP OK & VK - PP LANTAI 1) 12.00 m'
75 Kabel NYY 4x10 mm² (SDP OK & VK - PP LANTAI 2) 20.00 m'
76 Kabel NYY 4x16 mm² (SDP OK & VK - PP AC 1) 14.00 m'
77 Kabel NYY 4x10 mm² (SDP OK & VK - PP AC 2) 22.00 m'
78 Kabel NYY 4(1cx70) mm² (SDP OK & VK - PP AC OK) 35.00 m'
79 Kabel NYY 4x10 mm² (SDP OK & VK - PP Lift) 25.00 m'
80 Kabel NYY 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 1 70.00 m'
81 Kabel NYY 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 2 80.00 m'
82 Kabel NYY 4x4 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m'
83 Kabel NYY 3x4 mm² (PP LANTAI 2 - POMPA BOOSTER) 35.00 m'
Grounding Arus kuat
84 Kabel BC 120 mm² (Grounding Pentanahan 1 - SDP OK & VK) 20.00 m'
85 Kabel BC 120 mm² (Grounding Pentanahan 2 - SDP UPS OK ) 42.00 m'
86 Kabel BC 25 mm² (SDP UPS OK - UPS OK - PP UPS OK ) 24.00 m'
87 Kabel BC 50 mm² (Grounding Pentanahan 3 - UPS Cath lab 120 KVA) 40.00 m'
88 Kabel BC 6 mm² (Trafo isolasi - Grounding pentanahan 4 ) 70.00 m'
89 Kabel BC 6 mm² (PP Lift - Grounding pentanahan 5 ) 43.00 m'
90 Kabel BC 10 mm² (SDP OK & VK - PP Lantai 1) 12.00 m'
1 2 3 4 5
91 Kabel BC 6 mm² (SDP OK & VK - PP Lantai 2) 20.00 m'
92 Kabel BC 10 mm² (SDP OK & VK - PP AC 1) 14.00 m'
93 Kabel BC 6 mm² (SDP OK & VK - PP AC 2) 22.00 m'
94 Kabel BC 50 mm² (SDP OK & VK - PP AC OK) 35.00 m'
95 Kabel BC 6 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m'
96 Kabel BC 4 mm² (PP Lantai 1 - DUMB WAITER 1 70.00 m'
97 Kabel BC 4 mm² (PP Lantai 1 - DUMB WAITER 2 80.00 m'
1 2 3 4 5
123 Tee Ukuran 20 cm 1.00 bh
124 Supporting(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls
Sumber listrik Cadangan
125 UPS Ruang Operasi OK 60 Kva 3 Phase, 3 Phase in 1 Phase out 1.00 ls
126 UPS Ruang Operasi Cath Lab 120 Kva , 3 Phase in 3 Phase out (cath Lab) 1.00 ls
Sub Jumlah Instalasi Penerangan & kotak kontak
02 Instalasi Tata Udara / AC Lantai 1 & 2
Instalasi AC lengkap dengan Bracket, Pipa referigerant & Drain, pengkabelan & supporting
Lantai 1
1 Instalasi Power AC 1 Fasa (NYM 3x2.5 mm²) 18.00 titik
2 Instalasi Power AC 3 Fasa (NYM 4x2.5 mm²+NYA 2.5 mm² ) 2.00 titik
3 Air Conditioning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 3.00 unit
4 Air Conditioning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 4.00 unit
5 Air Conditioning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 4.00 unit
6 Air Conditioning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 1.00 unit
7 Air Conditioning split Kap. 18000 BTUH / 2 pk tipe Ceiling Casette 6.00 unit
8 Air Conditioning split Kap. 27000 BTUH / 3 pk tipe Ceiling Casette 2.00 unit
9 Outlet Stop kontak AC 1 phase 12.00 bh
10 Pipa referigerant 1/4″ + 3/8″ + Isolasi 132.00 m'
11 Pipa referigerant 1/4″ + 1/2″ + Isolasi 84.00 m'
12 Pipa referigerant 3/8″ + 5/8″ + Isolasi 30.00 m'
13 Pipa Drain PVC AW 1 1/4" + Isolasi 58.00 m'
14 Pipa Drain PVC AW 1'' + Isolasi 45.00 m'
15 Pipa Drain PVC AW 3/4'' + Isolasi 80.00 m'
1 2 3 4 5
Lantai 2
16 Instalasi Power AC 1 Fasa (NYM 3x2.5 mm²) 19.00 titik
17 Air Conditioning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 2.00 unit
18 Air Conditioning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 3.00 unit
19 Air Conditioning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 2.00 unit
21 Air Conditioning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 6.00 unit
22 Air Conditioning split Kap. 18000 BTUH / 2 pk tipe Ceiling Casette 6.00 unit
23 Outlet Stop kontak AC 1 phase 13.00 bh
24 Pipa referigerant 1/4″ + 3/8″ + Isolasi 105.00 m'
25 Pipa referigerant 1/4″ + 1/2″ + Isolasi 180.00 m'
26 Pipa Drain PVC AW 1 1/4" + Isolasi 60.00 m'
27 Pipa Drain PVC AW 1'' + Isolasi 50.00 m'
28 Pipa Drain PVC AW 3/4'' + Isolasi 76.00 m'
INSTALASI FAN LANTAI 1 & 2
29 Instalasi Power Fan 1 Fasa (NYM 3x2.5 mm²) 22.00 titik
30 Alumunium flexible ducting 8 inch 15.00 m'
31 Ceiling Exhausth Fan tipe sirocco 50 cfm 18.00 unit
32 Ceiling Exhausth Fan tipe sirocco 100 cfm 2.00 unit
33 Pipa PVC kelas D dia. 100 mm atau 4" 126.00 m'
34 Alumunium flexible ducting 4 inch 36.00 m'
35 Grill Exchaust fan Toilet ukuran 20 x 20 cm 8.00 bh
36 Industrial Wall Exchaust FAN 10" kap. 300 CFM 0.4 in wg low noise c/w asesories 2.00 unit
Sub Jumlah Instalasi Tata Udara / AC Lantai 1 & 2
Split duct Ruang Operasi (OK)
37 AC ruang Operasi 2 Lengkap Dengan aksessoris PMK NO 24 Tahun 2016
temperatur : 19 - 23 ˚C
Relative Humidity : 45 - 60 %
Air Change Ruang : 4 S/d 20 x jam
Indeks kebisingan : 45 dBA
tekanan udara : positif
lengkap dengan:
A Peralatan utama :
1. Unit AC type Split duct air cooled 1.00 unit
Type : Split Duct
Capacity : 100.000 Btu/h
Power suplay 11,4 Kw/380 V/ 3p
2. Boster Fan/Flug type c/w speed control 3200 cfm 1.00 unit
3. Exchaust Fan tipe axial 506 cfm 1.00 unit
1 2 3 4 5
- Pipa Refrigerant Cooper Astm B280 c/w isolasi & fittings
- Pipa Drain c/w isolasi
b Ducting :
Supply air duct bahan Polyurethane c/w supporting 1.00 lot
- ukuran 35 x 30 cm
- ukuran 50x 35 cm
- ukuran 850 x35 cm
Return air duct bahan Polyurethane c/w supporting 1.00 lot
- ukuran 35 x 30 cm
- ukuran 45 x 35 cm
- ukuran 75 x 35 cm
Fresh air duct bahan Polyurethane c/w supporting 1.00 lot
- Ducting Low Return
- Plenum box
- ukuran 30 x 25 cm
- Louvre Grill ukuran 30 x 25 cm
c Asesories ducting :
RAG 50 x 35 4.00 bh
Volume Damper Return 4.00 bh
Volume Damper Freash air 1.00 bh
Elictric Heater 6300 watt 1.00 bh
1 2 3 4 5
d Filter :
- Pre FILTER 2.00 unit
Type : G4 Washable
Material : Polyester Filter
Effciency : 90~95% Based On 10 µm
- Medium FILTER 2.00 unit
Type : F8
Effciency : 90~95% Based On 1 µm
- HEPA FILTER Type 4.00 unit
Type : H-14
Effciency : 99,99% Based On 0,3 µm
e Housing Filter
Housing Filter Pre + medium + isolasi 1.00 unit
Housing Filter Hepa(celling) 4.00 unit
f Pekerjaan Electrical Lengkap dengan 1.00 Lot
Panel Kontrol AC
Kabel Power (unit ac,outdoor ac, & Booster fan)NYY
Kabel Kontrol NYA
Pressure differensial indikator filter udara
1 2 3 4 5
- ukuran 35 x 30 cm
- ukuran 50x 35 cm
- ukuran 850 x35 cm
Return air duct bahan Polyurethane c/w supporting 1.00 lot
- ukuran 35 x 30 cm
- ukuran 45 x 35 cm
- ukuran 75 x 35 cm
Fresh air duct bahan Polyurethane c/w supporting 1.00 lot
- Ducting Low Return
- Plenum box
- ukuran 30 x 25 cm
- Louvre Grill ukuran 30 x 25 cm
c Asesories ducting :
RAG 50 x 35 4.00 bh
Volume Damper Return 4.00 bh
Volume Damper Freash air 1.00 bh
Elictric Heater 6300 watt 1.00 bh
1 2 3 4 5
d Filter :
- Pre FILTER 2.00 unit
Type : G4 Washable
Material : Polyester Filter
Effciency : 90~95% Based On 10 µm
- Medium FILTER 2.00 unit
Type : F8
Effciency : 90~95% Based On 1 µm
- HEPA FILTER Type 4.00 unit
Type : H-14
Effciency : 99,99% Based On 0,3 µm
e Housing Filter
Housing Filter Pre + medium + isolasi 1.00 unit
Housing Filter Hepa(celling) 4.00 unit
f Pekerjaan Electrical Lengkap dengan 1.00 Lot
Panel Kontrol AC
Kabel Power (unit ac,outdoor ac, & Booster fan)NYY
Kabel Kontrol NYA
Pressure differensial indikator filter udara
1 2 3 4 5
- ukuran 35 x 30 cm
- ukuran 50x 35 cm
- ukuran 850 x35 cm
Return air duct bahan Polyurethane c/w supporting 1.00 lot
- ukuran 35 x 30 cm
- ukuran 45 x 35 cm
- ukuran 75 x 35 cm
Fresh air duct bahan Polyurethane c/w supporting 1.00 lot
- Ducting Low Return
- Plenum box
- ukuran 30 x 25 cm
- Louvre Grill ukuran 30 x 25 cm
c Asesories ducting :
RAG 50 x 35 4.00 bh
Volume Damper Return 4.00 bh
Volume Damper Freash air 1.00 bh
Elictric Heater 5400 watt 1.00 bh
1 2 3 4 5
d Filter :
- Pre FILTER 2.00 unit
Type : G4 Washable
Material : Polyester Filter
Effciency : 90~95% Based On 10 µm
- Medium FILTER 2.00 unit
Type : F8
Effciency : 90~95% Based On 1 µm
- HEPA FILTER Type 4.00 unit
Type : H-14
Effciency : 99,99% Based On 0,3 µm
e Housing Filter
Housing Filter Pre + medium + isolasi 1.00 unit
Housing Filter Hepa(celling) 4.00 unit
f Pekerjaan Electrical Lengkap dengan 1.00 Lot
Panel Kontrol AC
Kabel Power (unit ac,outdoor ac, & Booster fan)NYY
Kabel Kontrol NYA
Pressure differensial indikator filter udara
Sub Jumlah Instalasi Tata Udara / AC Khusus Ruang OK
Sub Jumlah Total Instalasi Tata Udara / AC
03 Instalasi Telephone Lantai 1 & Lantai 2
Instalasi Kabel ITC 2x0.6mm² dalam High Impact conduit dia. 20 mm
1 Instalasi Telephone 14.00 titk
2 Hand set Telephone single line 14.00 bh
3 Outlet Telephone dinding 1 Pole 14.00 bh
Peralatan Utama
4 Unit utama PABX kap. 6 co line 32Extention lengkap dengan : 1.00 set
- Main Unit PABX, Power suplai, memory card, Extension card, analog card
- Pemasangan & Pemrograman
5 UPS 1200 VA 1.00 ls
6 Box MDF c/w frame & LSA40 Ext. 1.00 set
7 Kabel ITC 40x2x0.6mm² (MDF - PABX) 10.00 m'
8 Operator Konsul + Pesawat Operator 1.00 set
Sub Jumlah Instalasi Telephone
04 Instalasi Fire Alarm Lantai 1 & Lantai 2
Kabel NYA 2x1x1.5 mm² dalam High Impact conduit dia. 20 mm
1 Instalasi Heat Detector type Rate Of Rise (ROR) 74.00 titik
2 Heat detector ROR 58.00 bh
3 Smoke Detector 16.00 bh
4 End of Line 7.00 unit
1 2 3 4 5
5 Alarm bel 1.00 unit
6 instalasi Alarm bel 1.00 unit
7 Indicating lamp 1.00 unit
8 instalasi Indicating lamp 1.00 unit
9 Manual push button 1.00 unit
10 instalasi Manual push button 1.00 unit
Peralatan Utama
11 Main Control Fire Alarm (MCFA) tipe konvensional 10 Zone lengkap dengan peralatan 1.00 unit
12 Pemrograman MCFA 1.00 unit
13 UPS 1200 VA 1.00 ls
Sub Jumlah Instalasi Fire Alarm
05 Instalasi Tata Suara Lantai 1 & Lantai 2
Kabel NYMHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
1 Instalasi Ceilling Speaker 26.00 titik
2 Ceilling Speaker 3 W 26.00 bh
3 Volume Control & Instalasi 8.00 bh
4 Colum Speaker 10 W c/w bracket & material bantu 6.00 bh
Peralatan Utama
5 Speaker Selector 10 zone 1.00 unit
6 Mixer Power Amplifier 30 W 1.00 unit
7 Booster Power Amplifier 120 W 2.00 unit
8 Usb Player 1.00 unit
9 Hand Held Microphone 1.00 unit
10 Paging Microphone 1.00 unit
11 UPS 1200 VA 1.00 ls
12 MDF SS/ cabinet Rack 1.00 unit
Sub Jumlah Instalasi Tata Suara
1 2 3 4 5
06 Instalasi Kabel Wifi Lantai 1 & Lantai 2
Wifi hotspot
1 Kabel UTP Cat 6 dalam High Impact conduit dia. 20 mm
2 Instalasi Kabel Data Wifi 4.00 titik
3 Wifi Access Point 802,11n - 2,4GHz/5GHz R11 Meter 4.00 bh
4 Instalasi Kotak Kontak untuk Wifi (NYM 3x2,5mm2) 4.00 titik
5 Kotak Kontak Outbow 4.00 bh
6 Managed Switch Hub untuk UTP cat 6. kap 24 Port 1.00 bh
7 Instalasi power Switch Hub & Kotak Kontak. 1.00 bh
8 Instalasi Switch/ Hub ke Hub Consentrator Ke eksisting 1.00 titik
Sub Jumlah Instalasi Kabel Wifi
07 Instalasi CCTV Lantai 1 & Lantai 2
Kabel COAXIAL. RG 59 18AWG BC 95% dengan kabel power dalam High Impact conduit dia. 20 mm
1 Instalasi Kamera CCTV 15.00 titik
2 High Resolution Dome Camera high resolution lengkap dengan Power adaptor & asesorie 14.00 bh
3 High Resolution In door Box CCD Camera day and night lengkap dengan Power adaptor d 1.00 bh
Peralatan utama / Sentral CCTV
sentral CCTV lengkap dengan peralatan, pemasangan, pengkabelan & asesories
4 DVR Card Kap. 8 Channel C/W Hard Disks 2 terrabyte 2.00 unit
5 TV Monitor 32 inch 2.00 unit
6 UPS 2000 VA 2.00 ls
7 Meja CCTV 2.00 ls
Sub Jumlah Instalasi CCTV
08 Air Bekas, Kotor dan Vent Lantai 1 & Lantai 2
Pipa PVC AW komplit dgn galian, bobokan, Pengecatan, fitting & penggantung
1 Pipa PVC kelas AW dia. 150 mm atau 6" 74.00 m'
2 Pipa PVC kelas AW dia. 100 mm atau 4" 468.00 m'
3 Pipa PVC kelas AW dia. 80 mm atau 3" 88.00 m'
4 Pipa PVC kelas AW dia. 50 mm atau 2" 124.00 m'
5 Pipa PVC kelas AW dia.32 mm atau 1 1/4" 58.00 m'
6 Portable Grease trap pelat stainless ukuran (Pxlxt) 50x30x45 cm 3.00 unit
7 Bak Penampung infeksius kap. 3 m3 1.00 unit
- Galian
- struktur beton & Tutup beton
- Peralatan penetral logam
- finishing
8 Bak Penampung(Sumpit) kap. 2 m3 2.00 unit
- Galian
- struktur beton & Tutup beton
- Peralatan penetral logam
- finishing
1 2 3 4 5
9 Pompa Celup Sewage Kapasitas 100 L/m lengkap dengan instalasi power + aksesoris p 2.00 unit
10 Septictank Bio Limbah rumah sakit Kapasitas 3.000 Liter Lengkap dengan 2.00 unit
Galian & seling pengikat
Cairan pengurai dan tablet disinfeksikan
Penutup Septictank Bio (dinding Bata) + Tutup Plat besi 1,2 mm 2.00 unit
11 Manhole bak 30X30 Clean out 4 inci(area lantai 1) 15.00 Lot
Tutup manhole dak bak bata/plesteran
Clean out
elbow
12 Clean out (area lantai 2) 10.00 bh
13 Fitting + Supporting(Gantungan Pipa Besi Siku 50mm, Dynabolt, Mur & baut ) 1.00 lot
Site Plan
14 pengadaan & pemasangan sistem IPAL
Sub Jumlah Instalasi Air Bekas, Kotor dan Vent
09 Air Bersih Lantai 1 & Lantai 2
Pipa PPR PN 10 lengkap dengan fitting, bobokan & Penggantung
1 Pipa PPR PN 10 dia. 50 atau 1 1/2 " 110.00 m'
2 Pipa PPR PN 10 dia. 40 atau 1 1/4 " 122.00 m'
3 Pipa PPR PN 10 dia. 32 atau 1 " 128.00 m'
4 Pipa PPR PN 10 dia. 25 atau 3/4" 36.00 m'
5 Pipa PPR PN 10 dia. 20 atau 1/2" 442.00 m'
6 Gate Valve dia. 50 atau 1 1/2 " 2.00 bh
7 Gate Valve dia. 40 atau 1 1/4 " 1.00 bh
8 Gate Valve dia. 32 atau 1 " 4.00 bh
9 Fitting + Supporting(Gantungan Pipa Besi Siku 30mm, Dynabolt, Mur & baut ) 1.00 lot
1 2 3 4 5
POMPA TRANSFER AIR BERSIH
10 Paket Pompa Transfer air bersih kap. 8m3/jam Total head 40 meter 2 kw (1 Pompa) (leng 1.00 set
Gate valve 1 1/2''
Check valve 1 1/2''
Foot Valve 1 1/2''
Pressure Gauge
Panel kontrol pompa air bersih transfer
11 Bangunan/Struktur reservoir Ground Water Tank (GWT) kap. 2x50 m3 & rumah pompa 1.00 ls
AIR BERSIH di Atap
12 Header 3'' 1.00 set
13 Gate Valve 1 1/2 '' 7.00 bh
14 Rooftank Fiber kap. 2000 liter ukuran : dia. 1.45 tinggi 1.5 meter lengkap dengan peralatan 2.00 unit
15 Water Level Control 2.00 unit
16 Paket Pompa Booster air bersih kap. 5m3/jam Total head 45 meter 0,816Kw lengkap deng 1.00 unit
Sub Jumlah Instalasi Air Bersih
10 Air Panas
Pipa PPR PN 20 lengkap dengan fitting, bobokan & Penggantung
1 Pipa PPR PN 20 dia. 15 mm atau 1/2" 16.00 m'
2 Gate Valve 1/2'' 4.00 bh
3 Instalasi Power Water Heater c/w Kotak kontak 4.00 bh
4 Water Heater listrik kap. 15 liter c/w asesories 4.00 bh
5 Fitting + Supporting(Gantungan Pipa Besi Siku 30mm, Dynabolt, Mur & baut ) 1.00 lot
Sub Jumlah Instalasi Air Panas
11 Penanggulangan Kebakaran Lantai 1 & Lantai 2
1 Fire Extinguisher kap. 3 Kg Klass ABC tipe CO2 6.00 unit
Sub Jumlah Instalasi Penanggulangan Kebakaran
12 Saluran air hujan
1 Pipa PVC kelas AW dia. 100 mm atau 4" 612.00 m'
2 Pipa PVC kelas AW dia. 150 mm atau 6" 160.00 m'
3 Manhole bak 30X30 Clean out 4 inci(area lantai 1) 4.00 Lot
Tutup manhole dak bak bata/plesteran
Clean out 4 inci
4 Roof Drain dia. 100 mm atau 4" 51.00 bh
5 Fitting + Supporting 1.00 lot
6 Saluran drainase tipe terbuka lengkap dengan : m'
7 Bak Kontrol 50X50 bh
Sub Jumlah Instalasi Saluran Air Hujan
13 Instalasi Gas Medis Lantai 1 & Lantai 2
Out let gas medis lengkap dengan acessories, Pipa tembaga+penahan pipa
1 Outlet gas medis Oksigen 35.00 bh
2 Pipa Cooper 8 mm² O2 ~ 3/8" OD 70.00 m'
1 2 3 4 5
3 Pipa Cooper 12 mm² O2 ~ 1/2" OD 70.00 m'
4 Pipa Cooper 15 mm² O2 ~ 5/8" OD 58.00 m'
5 Pipa Cooper 20 mm² O2 ~ 3/4" OD 55.00 m'
6 Pipa Cooper 25 mm² O2 ~ 1" OD 65.00 m'
7 Outlet gas medis Vacuum 29.00 bh
8 Pipa Cooper 8 mm² Vacuum ~ 3/8" OD 58.00 m'
9 Pipa Cooper 12 mm² Vacuum ~ 1/2" OD 72.50 m'
10 Pipa Cooper 15 mm² VAcuum ~ 5/8" OD 55.00 m'
11 Pipa Cooper 20 mm² Vacuum ~ 3/4" OD 115.00 m'
12 Outlet gas medis Compressed Air 4 bar 18.00 bh
13 Pipa Cooper 8 mm² Compessed Air 4 bar ~ 3/8" OD 36.00 m'
14 Pipa Cooper 12 mm² Compessed Air 4 bar ~ 1/2" OD 45.00 m'
15 Pipa Cooper 15 mm² Compessed Air 4 bar ~ 5/8" OD 35.00 m'
16 Pipa Cooper 20 mm² Compessed Air 4 bar 3/4" OD 118.00 m'
17 Outlet gas medis Nitrous Oksida 12.00 bh
18 Pipa Cooper 8 mm² Nitrous Oksida ~ 3/8" OD 24.00 m'
19 Pipa Cooper 12 mm² Nitrous Oksida ~ 1/2" OD 30.00 m'
20 Pipa Cooper 15 mm² Nitrous Oksida ~ 5/8" OD 35.00 m'
21 Pipa Cooper 20 mm² Nitrous Oksida ~ 3/4" OD 118.00 m'
22 Outlet gas medis karbon dioksida 12.00 bh
23 Pipa Cooper 8 mm² karbon dioksida ~ 3/8" OD 24.00 m'
24 Pipa Cooper 12 mm² karbon dioksida ~ 1/2" OD 30.00 m'
25 Pipa Cooper 15 mm² karbon dioksida ~ 5/8" OD 34.00 m'
26 Pipa Cooper 20 mm² karbon dioksida ~ 3/4" OD 118.00 m'
27 Zone Box Valve 5 Line 1.00 unit
1 2 3 4 5
28 Manual Area Alarm 5 gas 1.00 unit
29 fitting Supporting 1.00 ls
Kawasan
30 Bangunan/Struktur Sentral Gas Medis 1.00 ls
31 Sentral karbon dioksida 1.00 ls
32 Sentral Nitrous Oksida 1.00 ls
33 Sentral oksigen 1.00 ls
34 Sentral Vacuum 1.00 ls
35 Sentral Compressed air 1.00 ls
Sub Jumlah Instalasi Gas Medis
14 Penyalur Petir
1 Head terminal Radius 80 meter 1.00 unit
2 Down conductor NYY 1X70 mm² 49.00 m
3 BC 50 mm² ring grounding 35.00 m
4 Sumuran grounding tahanan max 2 ohm 1.00 set
5 Tiang penyangga penangkal petir 9 meter 1.00 unit
Sub Jumlah Instalasi Penyalur Petir
15 BED ELEVATOR
1 Bed elevator kap 1000 kg (2 lantai/2 stop) Lengkap Dengan 1.00 unit
Elevator type bed(bed elevator)
Automatic 2 panel centre opening
finis wall stainless Hairlined
2 Dumbwaiter Kapasitas 100 Kg 2 lantai Termasuk Biaya ongkos kirim & jasa 2.00 unit
Ukuran Box 700(w) x 700(D) x 800(H)
3 Pekerjaan sipil Untuk Lift (beam,wp,baja & asseories) 1.00 lot
4 Pekerjaan sipil Untuk Dumb waiter (beam,wp,baja & asseories) 2.00 lot
Sub Jumlah Instalasi Bed Elevator
JUMLAH TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL
2 3 4 5 6
AAN STRUKTUR GEDUNG
AAN PENDAHULUAN
an Bowplank 2.2.1.4.a 170.20 M' 65,488.50
aran 1.00 Lsm 15,000,000.00
mentara 2.2.1.2.a 171.40 M' 304,623.00
ma Proyek 1.00 Lsm 400,000.00
Sub Jumlah I
AAN PONDASI
n Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 702.00 Btg 1,600,000.00
2 3 4 5 6
P6
Ready Mix K-300 B. 13.i.2 9.98 M³ 1,682,037.50
gan U32 4.1.1.17.b 652.08 Kg 18,317.75
ng Pondasi 4.1.1.20.a 21.56 M² 135,487.00
P8
Ready Mix K-300 B. 13.i.2 14.81 M³ 1,682,037.50
gan U32 4.1.1.17.b 892.79 Kg 18,317.75
ng Pondasi 4.1.1.20.a 25.76 M² 135,487.00
P9
Ready Mix K-300 B. 13.i.2 29.62 M³ 1,682,037.50
gan U32 4.1.1.17.b 1,785.57 Kg 18,317.75
ng Pondasi 4.1.1.20.a 51.52 M² 135,487.00
P10
Ready Mix K-300 B. 13.i.2 39.28 M³ 1,682,037.50
gan U32 4.1.1.17.b 2,266.98 Kg 18,317.75
ng Pondasi 4.1.1.20.a 59.92 M² 135,487.00
ndasi K1 Uk. 45x45 cm
Ready Mix K-225 B. 13.f.2 4.25 M³ 1,513,737.50
gan U32 4.1.1.17.b 1,722.01 Kg 18,317.75
gan U24 4.1.1.17.a 167.82 Kg 16,585.25
ng Pondasi 4.1.1.20.a 37.80 M² 135,487.00
ndasi K2 Uk. 30x30 cm
Ready Mix K-225 B. 13.f.2 0.44 M³ 1,513,737.50
gan U32 4.1.1.17.b 189.67 Kg 18,317.75
gan U24 4.1.1.17.a 25.07 Kg 16,585.25
ng Pondasi 4.1.1.20.a 5.88 M² 135,487.00
2 3 4 5 6
ndasi K2 Uk. 20x40 cm (L)
Ready Mix K-225 B. 13.f.2 0.36 M³ 1,513,737.50
gan U32 4.1.1.17.b 79.58 Kg 18,317.75
gan U24 4.1.1.17.a 8.58 Kg 16,585.25
ng Pondasi 4.1.1.20.a 1.92 M² 135,487.00
awah Lift :
asif
Ready Mix K 225 t = 14 cm B. 13.f.2 2.52 M³ 1,513,737.50
esh 2xM7 4.1.1.19 150.29 Kg 13,993.65
ng Balok 4.1.1.23.b 36.04 M² 228,085.00
ran Dinding 4.4.2.4 36.04 M² 71,177.04
proofing Dinding A.4.7.1.10.f 36.04 M² 26,582.05
h Dudukan Lift
Tanah 2.3.1.1 5.41 M³ 90,612.50
n Pasir tebal 10 cm 2.3.1.11 1.80 M³ 141,845.00
Kerja t = 5 cm 4.1.1.4 0.90 M³ 996,598.84
Ready Mix K 225 t = 16 cm B. 13.f.2 2.88 M³ 1,513,737.50
esh 2xM7 4.1.1.19 150.29 Kg 13,993.65
ran Atas Plat 4.4.2.4 18.02 M² 71,177.04
proofing Lantai A.4.7.1.10.f 18.02 M² 26,582.05
Sub Jumlah II
AAN STRUKTUR
antai 1
35x60 cm
Ready Mix K-225 B. 13.f.2 47.24 M³ 1,513,737.50
gan U32 4.1.1.17.b 9,766.80 Kg 18,317.75
gan U24 4.1.1.17.a 1,888.72 Kg 16,585.25
ng Sloof 4.1.1.21.a 364.43 M² 135,487.00
25x50 cm
Ready Mix K-225 B. 13.f.2 20.81 M³ 1,513,737.50
gan U32 4.1.1.17.b 2,695.54 Kg 18,317.75
gan U24 4.1.1.17.a 712.87 Kg 16,585.25
ng Sloof 4.1.1.21.a 218.49 M² 135,487.00
20x45 cm
Ready Mix K-225 B. 13.f.2 0.57 M³ 1,513,737.50
gan U32 4.1.1.17.b 64.15 Kg 18,317.75
gan U24 4.1.1.17.a 23.97 Kg 16,585.25
ng Sloof 4.1.1.21.a 7.31 M² 135,487.00
20x40 cm
Ready Mix K-225 B. 13.f.2 7.34 M³ 1,513,737.50
gan U32 4.1.1.17.b 983.01 Kg 18,317.75
2 3 4 5 6
gan U24 4.1.1.17.a 322.74 Kg 16,585.25
ng Sloof 4.1.1.21.a 97.93 M² 135,487.00
15x40 cm
Ready Mix K-225 B. 13.f.2 0.71 M³ 1,513,737.50
gan U32 4.1.1.17.b 100.11 Kg 18,317.75
gan U24 4.1.1.17.a 37.92 Kg 16,585.25
ng Sloof 4.1.1.21.a 11.89 M² 135,487.00
ng Uk.10x30 cm (blk.35/60)
Ready Mix K-225 B. 13.f.2 2.57 M³ 1,513,737.50
esh M7 4.1.1.19 142.74 Kg 13,993.65
ng Sloof 4.1.1.21.a 51.35 M² 135,487.00
ran Tutup Kolong Uk.10x30 cm (blk.35/60) 4.4.2.4 37.83 M² 71,177.04
ng Uk.10/30 (blk.25/50)
Ready Mix K-225 B. 13.f.2 0.65 M³ 1,513,737.50
esh M7 4.1.1.17.b 34.62 Kg 13,993.65
ng Sloof 4.1.1.17.a 12.92 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.25/50) 4.4.2.4 8.71 M² 71,177.04
ng Uk.10/50 (blk.20/40)
Ready Mix K-225 B. 13.f.2 1.54 M³ 1,513,737.50
esh M7 4.1.1.19 76.87 Kg 13,993.65
ng Sloof 4.1.1.21.a 30.73 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 18.44 M² 71,177.04
Uk. 45x45 cm Lt.1
Ready Mix K-225 B. 13.f.2 20.66 M³ 1,513,737.50
gan U32 4.1.1.17.b 3,612.60 Kg 18,317.75
gan U24 4.1.1.17.a 700.91 Kg 16,585.25
ng Kolom 4.1.1.22 b 183.60 M² 224,636.50
2 3 4 5 6
Uk. 30x30 cm Lt.1
Ready Mix K-225 B. 13.f.2 2.59 M³ 1,513,737.50
gan U32 4.1.1.17.b 454.75 Kg 18,317.75
gan U24 4.1.1.17.a 79.00 Kg 16,585.25
ng Kolom 4.1.1.22 b 34.56 M² 224,636.50
Uk. 20x20 cm Lt.1
Ready Mix K-225 B. 13.f.2 0.14 M³ 1,513,737.50
gan U32 4.1.1.17.b 56.84 Kg 18,317.75
gan U24 4.1.1.17.a 5.93 Kg 16,585.25
ng Kolom 4.1.1.22 b 2.88 M² 224,636.50
Uk. 20x40 cm (L) Lt.1
Ready Mix K-225 B. 13.f.2 0.96 M³ 1,513,737.50
gan U32 4.1.1.17.b 166.74 Kg 18,317.75
gan U24 4.1.1.17.a 61.62 Kg 16,585.25
ng Kolom 4.1.1.22 b 9.60 M² 224,636.50
ktis Uk.9x9 cm Lt.1
K175 4.1.1.4 6.50 M³ 996,598.84
gan U24 4.1.1.17.a 1,620.76 Kg 16,585.25
ng 4.1.1.20.a 144.50 M² 135,487.00
ktis Uk.9x9 cm Lt.1 (dinding)
K175 4.1.1.4 0.47 M³ 996,598.84
gan U24 4.1.1.17.a 115.98 Kg 16,585.25
ng 4.1.1.20.a 10.43 M² 135,487.00
Struktur Lantai 1
antai 2
Dack Uk.15/40 elv. 3.325
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.94 M³ 2,041,737.50
gan U32 4.1.1.17.b 779.08 Kg 18,317.75
gan U24 4.1.1.17.a 274.56 Kg 16,585.25
ng Balok 4.1.1.23.b 86.78 M² 228,085.00
ack elv. 3.360
Ready Mix K-225 menggunakan pompa B. 13.f.1 13.44 M³ 2,041,737.50
esh 2xM7 4.1.1.19 738.92 Kg 13,993.65
ng Lantai 4.1.1.24.b 156.58 M² 253,676.50
ran List Plat Dack elv. 3.360 4.4.2.4 279.93 M² 71,177.04
35x60 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 51.79 M³ 2,041,737.50
gan U32 4.1.1.17.b 10,359.79 Kg 18,317.75
gan U24 4.1.1.17.a 2,070.46 Kg 16,585.25
ng Balok 4.1.1.23.b 399.52 M² 228,085.00
25x50 cm Lt.2
2 3 4 5 6
Ready Mix K-225 menggunakan pompa B. 13.f.1 21.27 M³ 2,041,737.50
gan U32 4.1.1.17.b 2,849.91 Kg 18,317.75
gan U24 4.1.1.17.a 728.52 Kg 16,585.25
ng Balok 4.1.1.23.b 223.29 M² 228,085.00
20x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.95 M³ 2,041,737.50
gan U32 4.1.1.17.b 930.70 Kg 18,317.75
gan U24 4.1.1.17.a 305.30 Kg 16,585.25
ng Balok 4.1.1.23.b 92.63 M² 228,085.00
15x60 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.46 M³ 2,041,737.50
gan U32 4.1.1.17.b 826.13 Kg 18,317.75
gan U24 4.1.1.17.a 295.43 Kg 16,585.25
ng Balok 4.1.1.23.b 99.07 M² 228,085.00
15x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.71 M³ 2,041,737.50
gan U32 4.1.1.17.b 99.81 Kg 18,317.75
gan U24 4.1.1.17.a 37.81 Kg 16,585.25
ng Balok 4.1.1.23.b 11.85 M² 228,085.00
Uk. 45x45 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 34.63 M³ 2,041,737.50
gan U32 4.1.1.17.b 4,896.81 Kg 18,317.75
gan U24 4.1.1.17.a 1,154.96 Kg 16,585.25
ng Kolom 4.1.1.22 b 307.78 M² 224,636.50
2 3 4 5 6
Uk. 30x30 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.48 M³ 2,041,737.50
gan U32 4.1.1.17.b 454.75 Kg 18,317.75
gan U24 4.1.1.17.a 104.91 Kg 16,585.25
ng Kolom 4.1.1.22 b 46.37 M² 224,636.50
Uk. 20x20 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.80 M³ 2,041,737.50
gan U32 4.1.1.17.b 251.63 Kg 18,317.75
gan U24 4.1.1.17.a 32.42 Kg 16,585.25
ng Kolom 4.1.1.22 b 15.94 M² 224,636.50
Uk. 15x15 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.66 M³ 2,041,737.50
gan U32 4.1.1.17.b 677.30 Kg 18,317.75
gan U24 4.1.1.17.a 175.12 Kg 16,585.25
ng Kolom 4.1.1.22 b 48.75 M² 224,636.50
Uk. 20x40 cm (L) Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.70 M³ 2,041,737.50
gan U32 4.1.1.17.b 283.46 Kg 18,317.75
gan U24 4.1.1.17.a 112.79 Kg 16,585.25
ng Kolom 4.1.1.22 b 9.60 M² 224,636.50
ktis Uk.9x9 cm Lt.2
K175 4.1.1.4 8.61 M³ 996,598.84
gan U24 4.1.1.17.a 2,140.52 Kg 16,585.25
ng 4.1.1.20.a 191.27 M² 135,487.00
ktis Uk.9x9 cm Lt.2
K175 4.1.1.4 0.72 M³ 996,598.84
gan U24 4.1.1.17.a 177.76 Kg 16,585.25
ng 4.1.1.20.a 15.98 M² 135,487.00
15x40 cm elv.4.5
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.60 M³ 2,041,737.50
gan U32 4.1.1.17.b 716.23 Kg 18,317.75
gan U24 4.1.1.17.a 260.94 Kg 16,585.25
ng Balok 4.1.1.23.b 82.46 M² 228,085.00
ktis Uk.9x9 cm elv.4.5
K175 4.1.1.4 0.16 M³ 996,598.84
gan U24 4.1.1.17.a 41.61 Kg 16,585.25
ng 4.1.1.20.a 3.60 M² 135,487.00
ack elv. 4.5
Ready Mix K-225 menggunakan pompa B. 13.g.1 7.77 M³ 2,041,737.50
esh 2xM7 4.1.1.19 695.13 Kg 13,993.65
2 3 4 5 6
ng Lantai 4.1.1.24.b 100.36 M² 253,676.50
ran List Plat Dack elv. 4.5 4.4.2.4 139.04 M² 71,177.04
20x80 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 7.18 M³ 2,041,737.50
gan U32 4.1.1.17.b 1,064.53 Kg 18,317.75
gan U24 4.1.1.17.a 218.23 Kg 16,585.25
ng Balok 4.1.1.23.b 51.32 M² 228,085.00
25x50 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.86 M³ 2,041,737.50
gan U32 4.1.1.17.b 125.69 Kg 18,317.75
gan U24 4.1.1.17.a 29.95 Kg 16,585.25
ng Balok 4.1.1.23.b 9.03 M² 228,085.00
2 3 4 5 6
20x40 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.56 M³ 2,041,737.50
gan U32 4.1.1.17.b 166.28 Kg 18,317.75
gan U24 4.1.1.17.a 51.91 Kg 16,585.25
ng Balok 4.1.1.23.b 19.56 M² 228,085.00
elv. 7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.67 M³ 2,041,737.50
esh 2xM7 4.1.1.19 556.28 Kg 13,993.65
ng Lantai 4.1.1.24.b 50.37 M² 253,676.50
ran Plat Dack elv. 7.60 4.4.2.4 50.37 M² 71,177.04
Plat Dack elv. 7.60 4.4.2.27 50.37 M² 44,682.00
proofing Plat Dack elv. 7.60 A.4.7.1.10.f 50.37 M² 26,582.05
2 3 4 5 6
gan U24 4.1.1.17.a 36.64 Kg 16,585.25
ng Balok 4.1.1.23.b 11.01 M² 228,085.00
k uk. 15x40 cm Elv.8.980
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.75 M³ 2,041,737.50
gan U32 4.1.1.17.b 666.02 Kg 18,317.75
gan U24 4.1.1.17.a 250.27 Kg 16,585.25
ng Balok 4.1.1.23.b 79.09 M² 228,085.00
elv. 9.90
Ready Mix K-225 menggunakan pompa B. 13.f.1 62.12 M³ 2,041,737.50
esh 2xM7 4.1.1.19 5,180.81 Kg 13,993.65
ng Lantai 4.1.1.24.b 475.03 M² 253,676.50
ran Plat Dack elv. 9.8 4.4.2.4 950.06 M² 71,177.04
Plat Dack elv. 9.8 4.4.2.27 475.03 M² 44,682.00
proofing Plat Dack elv. 9.8 A.4.7.1.10.f 475.03 M² 26,582.05
20x40 cm Elv.10.50
Ready Mix K-225 menggunakan pompa B. 13.f.1 9.41 M³ 2,041,737.50
gan U32 4.1.1.17.b 988.85 Kg 18,317.75
gan U24 4.1.1.17.a 310.08 Kg 16,585.25
ng Balok 4.1.1.23.b 117.60 M² 228,085.00
20x45 cm Elv.11.480
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.93 M³ 2,041,737.50
gan U32 4.1.1.17.b 372.48 Kg 18,317.75
gan U24 4.1.1.17.a 114.32 Kg 16,585.25
ng Balok 4.1.1.23.b 41.28 M² 228,085.00
2 3 4 5 6
20x40 cm Elv.11.480
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.36 M³ 2,041,737.50
gan U32 4.1.1.17.b 96.24 Kg 18,317.75
gan U24 4.1.1.17.a 12.35 Kg 16,585.25
ng Balok 4.1.1.23.b 4.54 M² 228,085.00
15/40 cm Elv.11.480
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.49 M³ 2,041,737.50
gan U32 4.1.1.17.b 68.84 Kg 18,317.75
gan U24 4.1.1.17.a 26.19 Kg 16,585.25
ng Balok 4.1.1.23.b 8.18 M² 228,085.00
elv. 11.480
Ready Mix K-225 menggunakan pompa B. 13.f.1 5.11 M³ 2,041,737.50
esh 2xM7 4.1.1.19 426.17 Kg 13,993.65
ng Lantai 4.1.1.24.b 38.73 M² 253,676.50
ran Plat Dack elv. 11.480 4.4.2.4 77.46 M² 71,177.04
Plat Dack elv. 11.480 4.4.2.27 38.73 M² 44,682.00
proofing Plat Dack elv. 11.480 A.4.7.1.10.f 38.73 M² 26,582.05
Struktur Lantai 2 2
Sub Jumlah III 3
AAN PLAT LANTAI
1
Ready Mix K-225 t =12 cm B. 13.f.2 110.43 M³ 1,513,737.50
esh 2xM7 4.1.1.19 7,674.80 Kg 13,993.65
ng Lantai 4.1.1.24.c 655.36 M² 228,613.00
2
Ready Mix K-225 t =12 cm menggunakan pompa B. 13.f.1 121.13 M³ 2,041,737.50
esh 2xM7 4.1.1.19 8,418.31 Kg 13,993.65
ng Lantai 4.1.1.24.b 744.41 M² 253,676.50
Sub Jumlah IV
AAN TANGGA
pe T1 (1 Unit)
des uk. 15x40 cm
Ready Mix K-225 B. 13.f.2 0.16 M³ 1,513,737.50
gan U32 4.1.1.17.b 25.26 Kg 18,317.75
gan U24 4.1.1.17.a 9.84 Kg 16,585.25
ng Balok 4.1.1.23.b 3.24 M² 228,085.00
ran Balok Bordes 15/40 4.4.2.4 3.24 M² 71,177.04
s
Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³ 1,513,737.50
gan U24 4.1.1.17.a 86.78 Kg 16,585.25
ng Balok 4.1.1.23.b 3.31 M² 228,085.00
2 3 4 5 6
ran Bawah Plat Bordes 4.4.2.4 3.31 M² 71,177.04
a
Ready Mix K-225 t = 14 cm B. 13.f.2 1.60 M³ 1,513,737.50
gan U24 4.1.1.17.a 306.00 Kg 16,585.25
ng Plat 4.1.1.24.b 22.89 M² 253,676.50
ran Bawah Plat tangga 4.4.2.4 22.89 M² 71,177.04
ga
Ready Mix K-225 B. 13.f.2 0.86 M³ 1,513,737.50
esh M7 4.1.1.19 172.64 Kg 13,993.65
ng 4.1.1.21.a 5.76 M² 135,487.00
pe T2 (1 Unit)
des uk. 15x40 cm
Ready Mix K-225 B. 13.f.2 0.16 M³ 1,513,737.50
gan U32 4.1.1.17.b 25.26 Kg 18,317.75
gan U24 4.1.1.17.a 9.84 Kg 16,585.25
ng Balok 4.1.1.23.b 3.24 M² 228,085.00
ran Balok Bordes 15/40 4.4.2.4 3.24 M² 71,177.04
s
Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³ 1,513,737.50
gan U24 4.1.1.17.a 86.78 Kg 16,585.25
ng Balok 4.1.1.23.b 6.40 M² 228,085.00
ran Bawah Bordes 4.4.2.4 6.40 M² 71,177.04
a
Ready Mix K-225 t = 14 cm B. 13.f.2 2.07 M³ 1,513,737.50
gan U24 4.1.1.17.a 394.96 Kg 16,585.25
ng Plat 4.1.1.24.b 29.60 M² 253,676.50
ran Bawah Plat tangga 4.4.2.4 29.60 M² 71,177.04
2 3 4 5 6
ga
Ready Mix K-225 B. 13.f.2 1.12 M³ 1,513,737.50
esh M7 4.1.1.19 223.28 Kg 13,993.65
ng 4.1.1.21.a 7.45 M² 135,487.00
Sub Jumlah V
AAN ATAP
ap Baja Ringan Zincallume 8.1.1.3. 892.22 M2 165,000.00
llume Color t =0,35 mm A.4.5.2.41.b 892.22 M2 235,235.00
tap Zincallume A.4.5.2.42.a 64.20 M 209,930.60
Woodplak 2 lps 8.1.1.4. 117.25 M 110,000.00
Sub Jumlah VI
JUMLAH TOTAL PEKERJAAN STRUKTUR GEDUNG
AAN STRUKTUR SELASAR DAN RAMP
AAN PENDAHULUAN
an Bowplank 2.2.1.4.a 155.40 M' 65,488.50
Sub Jumlah I
AAN PONDASI
n Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, 8 D U&B 291.00 Btg 1,600,000.00
450 -6 m
gan Mini Pile 25 x 25 K450 1,746.00 M' 120,000.00
an Mini Pile 97.00 Titik 40,000.00
ah Pondasi 2.3.1.1 50.76 M³ 90,612.50
sir t = 10 cm 2.3.1.11 5.97 M³ 141,845.00
a t = 5 cm 4.1.1.4 2.99 M³ 996,598.84
P1
Ready Mix K-300 B. 13.i.2 1.36 M³ 1,682,037.50
gan U32 4.1.1.17.b 148.27 Kg 18,317.75
ng Pondasi 4.1.1.20.a 9.07 M² 135,487.00
P2
Ready Mix K-300 B. 13.i.2 32.03 M³ 1,682,037.50
gan U32 4.1.1.17.b 2,733.78 Kg 18,317.75
ng Pondasi 4.1.1.20.a 121.40 M² 135,487.00
P3
Ready Mix K-300 B. 13.i.2 4.23 M³ 1,682,037.50
gan U32 4.1.1.17.b 285.73 Kg 18,317.75
ng Pondasi 4.1.1.20.a 10.77 M² 135,487.00
ndasi K2 Uk. 30x30 cm
Ready Mix K-225 B. 13.f.2 2.84 M³ 1,513,737.50
gan U32 4.1.1.17.b 1,219.30 Kg 18,317.75
gan U24 4.1.1.17.a 161.16 Kg 16,585.25
ng Pondasi 4.1.1.20.a 37.80 M² 135,487.00
2 3 4 5 6
Sub Jumlah II
AAN STRUKTUR
antai 1
25x55 cm
Ready Mix K-225 B. 13.f.2 6.39 M³ 1,513,737.50
gan U32 4.1.1.17.b 773.08 Kg 18,317.75
gan U24 4.1.1.17.a 209.80 Kg 16,585.25
ng Sloof 4.1.1.21.a 65.30 M² 135,487.00
25x50 cm
Ready Mix K-225 B. 13.f.2 1.33 M³ 1,513,737.50
gan U32 4.1.1.17.b 186.83 Kg 18,317.75
gan U24 4.1.1.17.a 45.83 Kg 16,585.25
ng Sloof 4.1.1.21.a 13.92 M² 135,487.00
20x40 cm
Ready Mix K-225 B. 13.f.2 10.24 M³ 1,513,737.50
gan U32 4.1.1.17.b 1,447.84 Kg 18,317.75
gan U24 4.1.1.17.a 449.68 Kg 16,585.25
ng Sloof 4.1.1.21.a 136.51 M² 135,487.00
ng Uk. 10x45 (blk.25/55)
Ready Mix K-225 B. 13.f.2 2.59 M³ 1,513,737.50
esh M7 4.1.1.19 97.31 Kg 13,993.65
ng Sloof 4.1.1.21.a 51.87 M² 135,487.00
ran Tutup Kolong Uk. 10x35 (blk.25/55) 4.4.2.4 33.66 M² 71,177.04
2 3 4 5 6
ng Uk. 10x40 (blk.25/50)
Ready Mix K-225 B. 13.f.2 0.53 M³ 1,513,737.50
esh M7 4.1.1.19 27.65 Kg 13,993.65
ng Sloof 4.1.1.21.a 10.61 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 7.40 M² 71,177.04
ng Uk.10/50 (blk.20/40)
Ready Mix K-225 B. 13.f.2 2.87 M³ 1,513,737.50
esh M7 4.1.1.19 143.76 Kg 13,993.65
ng Sloof 4.1.1.21.a 57.46 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 34.48 M² 71,177.04
Uk. 30x30 cm Lt.1
Ready Mix K-225 B. 13.f.2 14.54 M³ 1,513,737.50
gan U32 4.1.1.17.b 2,415.87 Kg 18,317.75
gan U24 4.1.1.17.a 442.07 Kg 16,585.25
ng Kolom 4.1.1.22 b 193.80 M² 224,636.50
antai 2
Dack Uk.15/40 elv. 3.360
Ready Mix K-225 menggunakan pompa B. 13.f.1 5.00 M³ 2,041,737.50
gan U32 4.1.1.17.b 571.89 Kg 18,317.75
gan U24 4.1.1.17.a 197.97 Kg 16,585.25
ng Balok 4.1.1.23.b 62.55 M² 228,085.00
ack elv. 3.360
Ready Mix K-225 menggunakan pompa B. 13.f.1 7.67 M³ 2,041,737.50
esh 2xM7 4.1.1.19 584.98 Kg 13,993.65
ng Lantai 4.1.1.24.b 94.21 M² 253,676.50
ran List Plat Dack elv. 3.360 4.4.2.4 162.12 M² 71,177.04
25x55 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.25 M³ 2,041,737.50
gan U32 4.1.1.17.b 773.08 Kg 18,317.75
gan U24 4.1.1.17.a 205.41 Kg 16,585.25
ng Balok 4.1.1.23.b 63.93 M² 228,085.00
20x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 26.32 M³ 2,041,737.50
gan U32 4.1.1.17.b 3,576.49 Kg 18,317.75
gan U24 4.1.1.17.a 1,110.06 Kg 16,585.25
ng Balok 4.1.1.23.b 330.34 M² 228,085.00
Uk. 30x30 cm (elv.4.00-8.00) Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 14.22 M³ 2,041,737.50
gan U32 4.1.1.17.b 2,197.97 Kg 18,317.75
gan U24 4.1.1.17.a 431.87 Kg 16,585.25
ng Kolom 4.1.1.22 b 189.60 M² 224,636.50
2 3 4 5 6
20x80 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 13.98 M³ 2,041,737.50
gan U32 4.1.1.17.b 2,028.43 Kg 18,317.75
gan U24 4.1.1.17.a 423.51 Kg 16,585.25
ng Balok 4.1.1.23.b 99.89 M² 228,085.00
25x55 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.03 M³ 2,041,737.50
gan U32 4.1.1.17.b 124.30 Kg 18,317.75
gan U24 4.1.1.17.a 34.06 Kg 16,585.25
ng Balok 4.1.1.23.b 10.49 M² 228,085.00
20x40 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 8.51 M³ 2,041,737.50
gan U32 4.1.1.17.b 906.03 Kg 18,317.75
gan U24 4.1.1.17.a 280.40 Kg 16,585.25
ng Balok 4.1.1.23.b 106.36 M² 228,085.00
elv. 7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 22.80 M³ 2,041,737.50
esh 2xM7 4.1.1.19 1,901.52 Kg 13,993.65
ng Lantai 4.1.1.24.b 176.26 M² 253,676.50
ran Plat Dack elv.7.60 4.4.2.4 176.26 M² 71,177.04
Plat Dack elv. 7.60 4.4.2.27 176.26 M² 44,682.00
proofing Plat Dack elv. 7.60 A.4.7.1.10.f 176.26 M² 26,582.05
2 3 4 5 6
20x45 elv.6.8
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.79 M³ 2,041,737.50
gan U32 4.1.1.17.b 84.13 Kg 18,317.75
gan U24 4.1.1.17.a 23.29 Kg 16,585.25
ng Balok 4.1.1.23.b 8.32 M² 228,085.00
20x40 elv.6.8
Ready Mix K-225 menggunakan pompa B. 13.f.1 2.88 M³ 2,041,737.50
gan U32 4.1.1.17.b 396.01 Kg 18,317.75
gan U24 4.1.1.17.a 126.51 Kg 16,585.25
ng Balok 4.1.1.23.b 38.34 M² 228,085.00
2 3 4 5 6
Sub Jumlah V
JUMLAH TOTAL PEKERJAAN STRUKTUR SELASAR DAN RAMP
AAN ARSITEKTUR
AAN DINDING
p
ng Batako A.4.4.1.19.a 277.45 m2 102,991.46
eran 1:4 A.4.4.2.4 554.90 m2 71,177.04
2 3 4 5 6
AAN LANTAI
2 3 4 5 6
70 cm 4.00 Unit
A.4.2.1.11 29.40 m' 109,840.50
Pintu A.4.6.1.8.a 7.94 m2 882,231.58
l Pintu A.4.6.2.5 16.00 Set 35,702.70
Handle A.4.6.2.11.a 4.00 Set 120,928.50
lockcase A.4.6.2.1.a 4.00 Set 241,785.50
Stoper A.4.6.2.13 4.00 Set 292,033.50
Closer A.4.6.2.10 4.00 Set 247,384.50
5 mm A.4.6.2.17 2.43 m2 220,227.70
2 3 4 5 6
70 cm 13.00 Unit
A.4.2.1.11 92.95 m' 109,840.50
Pintu A.4.6.1.8.a 25.02 m2 882,231.58
l Pintu A.4.6.2.5 52.00 Set 35,702.70
Handle A.4.6.2.11.a 13.00 Set 120,928.50
lockcase A.4.6.2.1.a 13.00 Set 241,785.50
Stoper A.4.6.2.13 13.00 Set 292,033.50
Closer A.4.6.2.10 13.00 Set 247,384.50
5 mm A.4.6.2.17 5.20 m2 220,227.70
20 cm 5.00 Unit
A.4.2.1.11 26.00 m' 109,840.50
Pintu A.4.6.1.8.a 8.08 m2 882,231.58
l Pintu A.4.6.2.5 15.00 Set 35,702.70
Handle A.4.6.2.11.a 5.00 Set 120,928.50
lockcase A.4.6.2.1.a 5.00 Set 241,785.50
Stoper A.4.6.2.13 5.00 Set 292,033.50
20 cm 8.00 Unit
A.4.2.1.11 42.40 m' 109,840.50
Pintu A.4.6.1.8.a 14.34 m2 882,231.58
l Pintu A.4.6.2.5 24.00 Set 35,702.70
Handle A.4.6.2.11.a 8.00 Set 120,928.50
lockcase A.4.6.2.1.a 8.00 Set 241,785.50
Stoper A.4.6.2.13 8.00 Set 292,033.50
2 3 4 5 6
0 cm 6.00 Unit
A.4.2.1.11 152.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 10.52 m2 566,362.50
5 mm A.4.6.2.17 33.82 m2 220,227.70
ment Handle A.4.6.2.11.b 12.00 Set 49,868.50
n Stay A.4.6.2.9 24.00 Set 33,863.50
0 cm 1.00 Unit
A.4.2.1.11 18.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2 566,362.50
5 mm A.4.6.2.17 4.14 m2 220,227.70
ment Handle A.4.6.2.11.b 1.00 Set 49,868.50
n Stay A.4.6.2.9 2.00 Set 33,863.50
70 cm 3.00 Unit
A.4.2.1.11 61.20 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 2.32 m2 566,362.50
5 mm A.4.6.2.17 15.90 m2 220,227.70
ment Handle A.4.6.2.11.b 3.00 Set 49,868.50
n Stay A.4.6.2.9 6.00 Set 33,863.50
0 cm 16.00 Unit
A.4.2.1.11 216.96 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 13.21 m2 566,362.50
5 mm A.4.6.2.17 43.61 m2 220,227.70
ment Handle A.4.6.2.11.b 16.00 Set 49,868.50
n Stay A.4.6.2.9 32.00 Set 33,863.50
2 3 4 5 6
cm 1.00 Unit
A.4.2.1.11 2.48 m' 109,840.50
5 mm A.4.6.2.17 0.39 m2 220,227.70
cm 1.00 Unit
A.4.2.1.11 4.42 m' 109,840.50
5 mm A.4.6.2.17 0.80 m2 220,227.70
2 3 4 5 6
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 2.00 Set 292,033.50
Closer A.4.6.2.10 2.00 Set 247,384.50
5 mm A.4.6.2.17 0.80 m2 220,227.70
70 cm 17.00 Unit
A.4.2.1.11 121.55 m' 109,840.50
Pintu A.4.6.1.8.a 32.72 m2 882,231.58
l Pintu A.4.6.2.5 68.00 Set 35,702.70
Handle A.4.6.2.11.a 17.00 Set 120,928.50
lockcase A.4.6.2.1.a 17.00 Set 241,785.50
Stoper A.4.6.2.13 17.00 Set 292,033.50
Closer A.4.6.2.10 17.00 Set 247,384.50
5 mm A.4.6.2.17 6.80 m2 220,227.70
20 cm 2.00 Unit
A.4.2.1.11 10.55 m' 109,840.50
Pintu A.4.6.1.8.a 3.85 m2 882,231.58
l Pintu A.4.6.2.5 8.00 Set 35,702.70
Handle A.4.6.2.11.a 2.00 Set 120,928.50
lockcase A.4.6.2.1.a 2.00 Set 241,785.50
Stoper A.4.6.2.13 2.00 Set 292,033.50
Closer A.4.6.2.10 2.00 Set 247,384.50
2 3 4 5 6
20 cm 1.00 Unit
A.4.2.1.11 5.17 m' 109,840.50
Pintu A.4.6.1.8.a 1.70 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
Closer A.4.6.2.10 1.00 Set 247,384.50
20 cm 3.00 Unit
A.4.2.1.11 15.60 m' 109,840.50
Pintu A.4.6.1.8.a 4.85 m2 882,231.58
l Pintu A.4.6.2.5 9.00 Set 35,702.70
Handle A.4.6.2.11.a 3.00 Set 120,928.50
lockcase A.4.6.2.1.a 3.00 Set 241,785.50
Stoper A.4.6.2.13 3.00 Set 292,033.50
20 cm 1.00 Unit
A.4.2.1.11 5.30 m' 109,840.50
Pintu A.4.6.1.8.a 1.79 m2 882,231.58
l Pintu A.4.6.2.5 3.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
20 cm 4.00 Unit
A.4.2.1.11 20.40 m' 109,840.50
2 3 4 5 6
Pintu A.4.6.1.8.a 5.59 m2 882,231.58
l Pintu A.4.6.2.5 12.00 Set 35,702.70
Handle A.4.6.2.11.a 4.00 Set 120,928.50
lockcase A.4.6.2.1.a 4.00 Set 241,785.50
Stoper A.4.6.2.13 4.00 Set 292,033.50
20 cm 2.00 Unit
A.4.2.1.11 8.30 m' 109,840.50
Pintu A.4.6.1.8.a 3.52 m2 882,231.58
Gantung U&B 4.00 Set 143,000.00
ate Handle A.4.6.2.11.a 4.00 Set 120,928.50
Lockcase Sliding A.4.6.2.1.a 2.00 Set 241,785.50
0 cm 19.00 Unit
A.4.2.1.11 482.60 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 33.33 m2 566,362.50
5 mm A.4.6.2.17 107.11 m2 220,227.70
ment Handle A.4.6.2.11.b 38.00 Set 49,868.50
n Stay A.4.6.2.9 76.00 Set 33,863.50
0 cm 1.00 Unit
A.4.2.1.11 18.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2 566,362.50
5 mm A.4.6.2.17 4.14 m2 220,227.70
ment Handle A.4.6.2.11.b 1.00 Set 49,868.50
n Stay A.4.6.2.9 2.00 Set 33,863.50
2 3 4 5 6
70 cm 1.00 Unit
A.4.2.1.11 20.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2 566,362.50
5 mm A.4.6.2.17 5.30 m2 220,227.70
ment Handle A.4.6.2.11.b 1.00 Set 49,868.50
n Stay A.4.6.2.9 2.00 Set 33,863.50
0 cm 2.00 Unit
A.4.2.1.11 27.12 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 1.65 m2 566,362.50
5 mm A.4.6.2.17 5.45 m2 220,227.70
ment Handle A.4.6.2.11.b 2.00 Set 49,868.50
n Stay A.4.6.2.9 4.00 Set 33,863.50
cm 2.00 Unit
A.4.2.1.11 4.96 m' 109,840.50
5 mm A.4.6.2.17 0.79 m2 220,227.70
cm 2.00 Unit
A.4.2.1.11 8.84 m' 109,840.50
5 mm A.4.6.2.17 1.60 m2 220,227.70
2 3 4 5 6
p
20 cm 3.00 Unit
A.4.2.1.11 16.12 m' 109,840.50
Pintu A.4.6.1.8.a 6.43 m2 882,231.58
l Pintu A.4.6.2.5 12.00 Set 35,702.70
Handle A.4.6.2.11.a 3.00 Set 120,928.50
lockcase A.4.6.2.1.a 3.00 Set 241,785.50
Stoper A.4.6.2.13 3.00 Set 292,033.50
Closer A.4.6.2.10 3.00 Set 247,384.50
Sub Jumlah IV
AAN SANITAIR
2 3 4 5 6
Sink A.5.1.1.1.a 2.00 set 4,973,595.00
b Up Sink Double Bay 1.00 set 126,500,000.00
uksi / Bahan Body
ntuk pengoperasian kran air dan sabun dengan manual (pedal / lutut) : Plat SS 304 1.0 mm HL
n : 1400-1800(w)x600(t)x1800(h) mm
Supply : 220V AC
or Unit : Power Lamp / Heather Lamp
u UV : 2 x 30 W Unites 89 PM
t UV : 2 x 30 W/24V
atic Sensor Soup : 2 Pcs Fotex CDR - 10X
Spout : 2 Pcs Stuchi Spol
atic Sensor Water : 2 Pcs Fotex CDR - 30X
r : 1 Pcs 1000 W AC 220V, suhu max 45° C
: 1 Pcs Pipa SS 304 Ø 4"
oid Valve : 2 Pcs Tipe DW-15 24V DC
Meter : 1 Pcs 24V DC
ng Filter : 2 Pcs
g Flexible : SS alpi
or : 1 Pcs 24V DC
Cermin 5 mm ex. Lokal A.4.6.2.20 19.23 m2 531,393.50
Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.81 m3 7,361,243.29
2 3 4 5 6
u UV : 2 x 30 W Unites 89 PM
t UV : 2 x 30 W/24V
atic Sensor Soup : 2 Pcs Fotex CDR - 10X
Spout : 2 Pcs Stuchi Spol
atic Sensor Water : 2 Pcs Fotex CDR - 30X
r : 1 Pcs 1000 W AC 220V, suhu max 45° C
: 1 Pcs Pipa SS 304 Ø 4"
oid Valve : 2 Pcs Tipe DW-15 24V DC
Meter : 1 Pcs 24V DC
ng Filter : 2 Pcs
g Flexible : SS alpi
or : 1 Pcs 24V DC
Cermin 5 mm ex. Lokal A.4.6.2.20 3.51 m2 531,393.50
Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.35 m3 7,361,243.29
Sub Jumlah V
AAN PENGECATAN
2 3 4 5 6
p
g Luar (weathershield) A.4.7.1.10.b 645.64 m2 29,332.05
g Dalam (easy clean) A.4.7.1.10.a 178.69 m2 31,048.05
Tangga :
ndrail dan Railling tangga 1 A.4.2.1.20.a 22.74 m2 457,842.00
ndrail dan Railling tangga 2 A.4.2.1.20.a 24.04 m2 457,842.00
lekat Meja Konter Bahan Multipleks Fin. HPL 5.66 m' 1,500,000.00
Tangga :
ndrail dan Railling ( Void ) A.4.2.1.20.a 26.12 m2 457,842.00
Sub Jumlah VII
TUR KHUSUS RUANG OK
cal Insulated Panel EPS, t. 75 mm, Antibacterial 250.63 m2 913,000.00
dical Insulated Panel EPS, t. 75 mm, Antibacterial 119.38 m2 913,000.00
enum / RAG, tidak termasuk grille 12.00 Unit 3,520,000.00
Timer (jam, countdown, temp, humidity), recessed on wall 3.00 Unit 38,500,000.00
n : 850 (w) x 400 (h) x 350 (t) mm
ng Text : Dot Matrix
r : Sesirion
: 40 W
er, recessed on wall 3.00 Unit 20,900,000.00
n : 800 (w) x 500 (h) x 45 (t) mm
itas : 2 Film
dan Body : SS 304 HL 1.2 mm
u : LED Module 3 mata
turan Kecerahan : Dimme / Rotary Switch
: DC 165 W / 12 V / 8,3 A
S Mirror 304, recessed on wall 8.00 Unit 35,200,000.00
n Luar : 700 (w) x 750 (h) x 600 (t) mm
: SS SUS 304 Mirror, 1.2 mm
m : Interlock Magnetic
Kedua Sisi Pakai Kaca Clear 6 mm
: DC 220 W / 12 V / 4,2 A
2 3 4 5 6
ng Door Manual 2.00 Unit 14,850,000.00
n Opening : 900 (w) x 2200 (h) mm
Bottom Seal
vation Glass : 400 (w) x 600 (h) mm, clear glass 8 mm
soris : Engsel, Lockset & Handle
ing Door Full Hermatic 3.00 Unit 137,500,000.00
n Opening : 1600 (w) x 2200 (h) mm
m Automatic
vation Glass : 400 (w) x 600 (h) mm, clear glass 8 mm
soris : Trackrell; Roda; Frame Door & Kusen
ing Door Full Hermatic 1.00 Unit 126,500,000.00
n Opening : 1600 (w) x 2200 (h) mm
m Automatic
soris : Trackrell; Roda; Frame Door & Kusen
Sub Jumlah VIII
TUR FASADE BANGUNAN
Flat Tebal 0.3 mm + Pemasangan U&B 313.39 m2 935,000.00
Aluminium U&B 81.43 m2 1,036,200.00
age :
LASI BERSALIN 975.80 cm 17,400.00
LASI BEDAH SENTRAL 1,205.40 cm 17,400.00
Sub Jumlah IX
JUMLAH TOTAL PEKERJAAN ARSITEKTUR
2 3 4 5 6
AAN MEKANIKAL ELEKTRIKAL
Penerangan dan Kotak Kontak Lantai 1 & Lantai 2
M 2 x 2.5 mm² dalam High Impact conduit dia. 20 mm
2 3 4 5 6
enerangan 68.00 titik 251,112.98
d Baret Circular 10 W 67.00 bh 404,375.00
d Baret Circular 10 W + Nicad Batery 1.00 bh 864,375.00
anda 5.00 bh 55,800.00
D R. Tindakan
Finishing aluminium c/w 1 sakelar tunggal, lampu TL LED 2 x 10 Watt, 5 Outlet 11.00 unit 2,359,000.00
otak kontak Bed Head (1 kabel Power untuk 3 kotak kontak) 11.00 titik 290,908.00
ower lampu Bed Head 11.00 titik 251,112.98
Grounding Listrik
52.00 meter 78,000.00
grounding arus kuat tahanan maksimal 2 ohm 2.00 unit 3,500,000.00
grounding Lift arus kuat tahanan maksimal 1 ohm 1.00 unit 3,500,000.00
Grounding medis
Dari P.P Ok ke pentanahan 85.00 meter 40,950.00
36.00 meter 78,000.00
grounding trafo isolasi tahanan maksimal 0,2 ohm 1.00 unit 3,500,000.00
grounding perangkat medis Cath Lab tahanan maksimal 0,5 ohm 1.00 unit 3,500,000.00
Kabel Feeder
2 3 4 5 6
RIBUSI PANEL OK & VK (Wall mounted)
Ukuran 60 x 80 x 20 cm 1.00 bh 3,531,500.00
0A, 36kA, 3P 1.00 bh 3,080,000.00
0A, 18kA, 3P 1.00 bh 1,540,000.00
A, 7,5kA, 3P 2.00 bh 653,800.00
A, 7,5kA, 3P 2.00 bh 653,800.00
A, 7,5kA, 3P 1.00 bh 653,800.00
3P, 10 kA 1.00 bh 553,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,500,000.00
ster tipe 1 3P+N 1.00 bh 4,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
RIBUSI PANEL UPS OK (Wall mounted)
Ukuran 60 x 80 x 20 cm 1.00 bh 3,531,500.00
0A, 36kA, 3P 1.00 bh 3,080,000.00
5A, 18kA, 3P 1.00 bh 1,402,500.00
3P, 10 kA 1.00 bh 553,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,500,000.00
ster tipe 1 3P+N 1.00 bh 4,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
ANEL UPS OK (Wall mounted)
Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
5A, 18kA, 3P 1.00 bh 1,402,500.00
6kA, 3P 1.00 bh 553,500.00
4,5kA, 1P 5.00 bh 85,500.00
4,5kA, 1P 5.00 bh 85,500.00
4,5kA, 1P 1.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
2 3 4 5 6
ANEL OK 2 (Wall mounted) 1.00 Lot 10,500,000.00
4,5kA, 2P 2.00 bh
4,5kA, 2P 5.00 bh
4,5kA, 1P 1.00 bh
ter, 3CT + selector switch 1.00 bh
+ selector switch 1.00 bh
Holder 3.00 bh
nda 3.00 bh
1.00 lot
l + Material bantu 1.00 lot
ransformer 5KVA 1.00 lot
ANEL OK 3 (Wall mounted) 1.00 Lot 10,500,000.00
4,5kA, 2P 2.00 bh
4,5kA, 2P 5.00 bh
4,5kA, 1P 1.00 bh
ter, 3CT + selector switch 1.00 bh
+ selector switch 1.00 bh
Holder 3.00 bh
nda 1.00 bh
1.00 lot
l + Material bantu 1.00 lot
ransformer 5KVA 1.00 lot
2 3 4 5 6
ANEL OK 4 (Wall mounted) 1.00 Lot 10,500,000.00
4,5kA, 2P 2.00 bh
4,5kA, 2P 5.00 bh
4,5kA, 1P 1.00 bh
ter, 3CT + selector switch 1.00 bh
+ selector switch 1.00 bh
Holder 3.00 bh
nda 1.00 bh
1.00 lot
l + Material bantu 1.00 lot
ransformer 5KVA 1.00 lot
ANEL OK 5 (Wall mounted) 1.00 Lot 10,500,000.00
4,5kA, 2P 2.00 bh
4,5kA, 2P 5.00 bh
4,5kA, 1P 1.00 bh
ter, 3CT + selector switch 1.00 bh
+ selector switch 1.00 bh
Holder 3.00 bh
nda 1.00 bh
1.00 lot
l + Material bantu 1.00 lot
ransformer 5KVA 1.00 lot
ANEL OK 6 (Wall mounted) 1.00 Lot 10,500,000.00
4,5kA, 2P 2.00 bh
4,5kA, 2P 5.00 bh
4,5kA, 1P 1.00 bh
ter, 3CT + selector switch 1.00 bh
+ selector switch 1.00 bh
Holder 3.00 bh
nda 1.00 bh
1.00 lot
l + Material bantu 1.00 lot
ransformer 5KVA 1.00 lot
2 3 4 5 6
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
ANEL LANTAI 2 (Wall mounted)
Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 4,5kA, 1P 2.00 bh 85,500.00
4,5kA, 1P 9.00 bh 85,500.00
4,5kA, 1P 15.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
2 3 4 5 6
ANEL AC 1 (Wall mounted)
Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 4,5kA, 1P 11.00 bh 85,500.00
4,5kA, 1P 7.00 bh 85,500.00
4,5kA, 1P 7.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
ANEL AC 2 (Wall mounted)
Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 4,5kA, 1P 3.00 bh 85,500.00
4,5kA, 1P 11.00 bh 85,500.00
4,5kA, 1P 4.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
l + Material bantu 1.00 lot 1,000,000.00
ANEL AC OK (OUTDOOR TYPE)
Ukuran 60 x 1200 x 25 cm 1.00 bh 6,000,000.00
0A, 18kA, 3P 1.00 bh 1,540,000.00
A, 10kA, 3P 6.00 bh 653,800.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,500,000.00
ure 1.00 bh 2,500,000.00
l + Material bantu 1.00 lot 1,000,000.00
rol pompa air bersih transfer 1.00 bh By Pompa Transfer
rol pompa Booster 1.00 bh By Pompa Booster
der
FGBY 4x185 mm² (SDP IPSRS - SDP OK & VK) 138.00 m' 1,736,250.00
FGBY 4x185 mm² (SDP IPSRS - SDP UPS OK) 158.00 m' 1,736,250.00
Y 4x95 mm² (SDP OK - UPS 120 KVA Cath lab) 17.00 m' 907,400.00
2 3 4 5 6
Y 4x95 mm² (UPS 120 KVA Cath Lab -Panel Main swicth- Mesin Cath Lab) BY OTHER
Y 4x50 mm² (SDP OK - PP UPS OK) 13.00 m' 464,750.00
Y 4x50 mm² (PP UPS OK - UPS OK 60 KVA) 18.00 m' 464,750.00
Y 3x10 mm² (PP UPS OK - PP OK 2) 37.00 m' 65,234.00
Y 3x10 mm² (PP UPS OK - PP OK 3) 38.00 m' 65,234.00
Y 3x10 mm² (PP UPS OK - PP OK 4) 55.00 m' 65,234.00
Y 3x10 mm² (PP UPS OK - PP OK 5) 56.00 m' 65,234.00
Y 3x10 mm² (PP UPS OK - PP OK 6) 66.00 m' 65,234.00
Y 4x16 mm² (SDP OK & VK - PP LANTAI 1) 12.00 m' 166,400.00
Y 4x10 mm² (SDP OK & VK - PP LANTAI 2) 20.00 m' 84,058.00
Y 4x16 mm² (SDP OK & VK - PP AC 1) 14.00 m' 166,400.00
Y 4x10 mm² (SDP OK & VK - PP AC 2) 22.00 m' 84,058.00
Y 4(1cx70) mm² (SDP OK & VK - PP AC OK) 35.00 m' 644,800.00
Y 4x10 mm² (SDP OK & VK - PP Lift) 25.00 m' 84,058.00
Y 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 1 70.00 m' 25,480.00
Y 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 2 80.00 m' 25,480.00
Y 4x4 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m' 42,900.00
Y 3x4 mm² (PP LANTAI 2 - POMPA BOOSTER) 35.00 m' 28,860.00
Arus kuat
120 mm² (Grounding Pentanahan 1 - SDP OK & VK) 20.00 m' 195,000.00
120 mm² (Grounding Pentanahan 2 - SDP UPS OK ) 42.00 m' 195,000.00
25 mm² (SDP UPS OK - UPS OK - PP UPS OK ) 24.00 m' 40,950.00
50 mm² (Grounding Pentanahan 3 - UPS Cath lab 120 KVA) 40.00 m' 78,000.00
6 mm² (Trafo isolasi - Grounding pentanahan 4 ) 70.00 m' 11,700.00
6 mm² (PP Lift - Grounding pentanahan 5 ) 43.00 m' 11,700.00
10 mm² (SDP OK & VK - PP Lantai 1) 12.00 m' 22,100.00
2 3 4 5 6
6 mm² (SDP OK & VK - PP Lantai 2) 20.00 m' 11,700.00
10 mm² (SDP OK & VK - PP AC 1) 14.00 m' 22,100.00
6 mm² (SDP OK & VK - PP AC 2) 22.00 m' 11,700.00
50 mm² (SDP OK & VK - PP AC OK) 35.00 m' 78,000.00
6 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m' 11,700.00
4 mm² (PP Lantai 1 - DUMB WAITER 1 70.00 m' 10,400.00
4 mm² (PP Lantai 1 - DUMB WAITER 2 80.00 m' 10,400.00
2 3 4 5 6
n 20 cm 1.00 bh 106,214.00
g(Besi Siku 50mm, Dynabolt, Mur & baut) 1.00 ls 1,266,596.40
trik Cadangan
g Operasi OK 60 Kva 3 Phase, 3 Phase in 1 Phase out 1.00 ls BY OTHER
g Operasi Cath Lab 120 Kva , 3 Phase in 3 Phase out (cath Lab) 1.00 ls BY OTHER
Sub Jumlah Instalasi Penerangan & kotak kontak
Tata Udara / AC Lantai 1 & 2
C lengkap dengan Bracket, Pipa referigerant & Drain, pengkabelan & supporting
2 3 4 5 6
2 3 4 5 6
rigerant Cooper Astm B280 c/w isolasi & fittings
in c/w isolasi
2 3 4 5 6
90~95% Based On 1 µm
FILTER Type 4.00 unit 5,872,500.00
4
99,99% Based On 0,3 µm
lter
lter Pre + medium + isolasi 1.00 unit 11,340,000.00
lter Hepa(celling) 4.00 unit 14,805,000.00
Electrical Lengkap dengan 1.00 Lot 60,750,000.00
trol AC
er (unit ac,outdoor ac, & Booster fan)NYY
trol NYA
differensial indikator filter udara
2 3 4 5 6
5 x 30 cm
0x 35 cm
50 x35 cm
duct bahan Polyurethane c/w supporting 1.00 lot 49,000,000.00
5 x 30 cm
5 x 35 cm
5 x 35 cm
uct bahan Polyurethane c/w supporting 1.00 lot 34,762,500.00
Low Return
box
0 x 25 cm
Grill ukuran 30 x 25 cm
ducting :
35 4.00 bh 708,750.00
amper Return 4.00 bh 607,500.00
amper Freash air 1.00 bh 877,500.00
ater 6300 watt 1.00 bh 33,750,000.00
2 3 4 5 6
90~95% Based On 1 µm
FILTER Type 4.00 unit 5,872,500.00
4
99,99% Based On 0,3 µm
lter
lter Pre + medium + isolasi 1.00 unit 11,340,000.00
lter Hepa(celling) 4.00 unit 14,805,000.00
Electrical Lengkap dengan 1.00 Lot 60,750,000.00
trol AC
er (unit ac,outdoor ac, & Booster fan)NYY
trol NYA
differensial indikator filter udara
2 3 4 5 6
5 x 30 cm
0x 35 cm
50 x35 cm
duct bahan Polyurethane c/w supporting 1.00 lot 47,250,000.00
5 x 30 cm
5 x 35 cm
5 x 35 cm
uct bahan Polyurethane c/w supporting 1.00 lot 34,762,500.00
Low Return
box
0 x 25 cm
Grill ukuran 30 x 25 cm
ducting :
35 4.00 bh 708,750.00
amper Return 4.00 bh 607,500.00
amper Freash air 1.00 bh 877,500.00
ater 5400 watt 1.00 bh 32,500,000.00
2 3 4 5 6
90~95% Based On 1 µm
FILTER Type 4.00 unit 5,872,500.00
4
99,99% Based On 0,3 µm
lter
lter Pre + medium + isolasi 1.00 unit 11,340,000.00
lter Hepa(celling) 4.00 unit 14,805,000.00
Electrical Lengkap dengan 1.00 Lot 60,750,000.00
trol AC
er (unit ac,outdoor ac, & Booster fan)NYY
trol NYA
differensial indikator filter udara
Sub Jumlah Instalasi Tata Udara / AC Khusus Ruang OK
Sub Jumlah Total Instalasi Tata Udara / AC
Telephone Lantai 1 & Lantai 2
abel ITC 2x0.6mm² dalam High Impact conduit dia. 20 mm
elephone 14.00 titk 420,600.00
Telephone single line 14.00 bh BY OTHER
phone dinding 1 Pole 14.00 bh 85,000.00
Utama
PABX kap. 6 co line 32Extention lengkap dengan : 1.00 set 20,015,000.00
t PABX, Power suplai, memory card, Extension card, analog card
ngan & Pemrograman
VA 1.00 ls 5,932,000.00
c/w frame & LSA40 Ext. 1.00 set 4,900,000.00
40x2x0.6mm² (MDF - PABX) 10.00 m' 417,500.00
Konsul + Pesawat Operator 1.00 set 4,850,000.00
Sub Jumlah Instalasi Telephone
Fire Alarm Lantai 1 & Lantai 2
2x1x1.5 mm² dalam High Impact conduit dia. 20 mm
eat Detector type Rate Of Rise (ROR) 74.00 titik 219,500.00
ctor ROR 58.00 bh 192,025.00
tector 16.00 bh 640,640.00
e 7.00 unit 15,000.00
2 3 4 5 6
1.00 unit 341,500.00
arm bel 1.00 unit 189,500.00
amp 1.00 unit 198,500.00
ndicating lamp 1.00 unit 189,500.00
sh button 1.00 unit 335,000.00
anual push button 1.00 unit 189,500.00
Utama
rol Fire Alarm (MCFA) tipe konvensional 10 Zone lengkap dengan peralatan 1.00 unit 14,375,000.00
man MCFA 1.00 unit 4,000,000.00
VA 1.00 ls 5,932,000.00
Sub Jumlah Instalasi Fire Alarm
Tata Suara Lantai 1 & Lantai 2
MHY 2x1.5 mm² dalam High Impact conduit dia. 20 mm
eilling Speaker 26.00 titik 326,400.00
eaker 3 W 26.00 bh 225,165.00
ontrol & Instalasi 8.00 bh 253,050.00
eaker 10 W c/w bracket & material bantu 6.00 bh 758,775.00
Utama
elector 10 zone 1.00 unit 8,500,800.00
er Amplifier 30 W 1.00 unit 8,400,000.00
ower Amplifier 120 W 2.00 unit 3,738,000.00
r 1.00 unit 5,538,400.00
Microphone 1.00 unit 868,000.00
crophone 1.00 unit 7,675,500.00
VA 1.00 ls 5,932,000.00
abinet Rack 1.00 unit 18,046,875.00
Sub Jumlah Instalasi Tata Suara
2 3 4 5 6
Kabel Wifi Lantai 1 & Lantai 2
ot
P Cat 6 dalam High Impact conduit dia. 20 mm
abel Data Wifi 4.00 titik 435,000.00
s Point 802,11n - 2,4GHz/5GHz R11 Meter 4.00 bh 1,665,000.00
otak Kontak untuk Wifi (NYM 3x2,5mm2) 4.00 titik 290,908.00
tak Outbow 4.00 bh 49,600.00
Switch Hub untuk UTP cat 6. kap 24 Port 1.00 bh 3,600,000.00
ower Switch Hub & Kotak Kontak. 1.00 bh 290,908.00
witch/ Hub ke Hub Consentrator Ke eksisting 1.00 titik BY OTHER
Sub Jumlah Instalasi Kabel Wifi
CCTV Lantai 1 & Lantai 2
AXIAL. RG 59 18AWG BC 95% dengan kabel power dalam High Impact conduit dia. 20 mm
amera CCTV 15.00 titik 460,000.00
lution Dome Camera high resolution lengkap dengan Power adaptor & asesorie 14.00 bh 522,600.00
lution In door Box CCD Camera day and night lengkap dengan Power adaptor d 1.00 bh 1,355,000.00
utama / Sentral CCTV
TV lengkap dengan peralatan, pemasangan, pengkabelan & asesories
Kap. 8 Channel C/W Hard Disks 2 terrabyte 2.00 unit 6,492,200.00
r 32 inch 2.00 unit 4,000,000.00
VA 2.00 ls 8,690,000.00
V 2.00 ls 2,000,000.00
Sub Jumlah Instalasi CCTV
, Kotor dan Vent Lantai 1 & Lantai 2
AW komplit dgn galian, bobokan, Pengecatan, fitting & penggantung
kelas AW dia. 150 mm atau 6" 74.00 m' 260,524.00
kelas AW dia. 100 mm atau 4" 468.00 m' 135,437.50
kelas AW dia. 80 mm atau 3" 88.00 m' 89,190.75
kelas AW dia. 50 mm atau 2" 124.00 m' 56,562.00
kelas AW dia.32 mm atau 1 1/4" 58.00 m' 41,206.00
rease trap pelat stainless ukuran (Pxlxt) 50x30x45 cm 3.00 unit 2,812,500.00
mpung infeksius kap. 3 m3 1.00 unit 12,000,000.00
2 3 4 5 6
lup Sewage Kapasitas 100 L/m lengkap dengan instalasi power + aksesoris p 2.00 unit 3,965,908.00
Bio Limbah rumah sakit Kapasitas 3.000 Liter Lengkap dengan 2.00 unit 25,300,000.00
eling pengikat
ngurai dan tablet disinfeksikan
eptictank Bio (dinding Bata) + Tutup Plat besi 1,2 mm 2.00 unit 2,000,000.00
ak 30X30 Clean out 4 inci(area lantai 1) 15.00 Lot 750,000.00
hole dak bak bata/plesteran
2 3 4 5 6
RANSFER AIR BERSIH
mpa Transfer air bersih kap. 8m3/jam Total head 40 meter 2 kw (1 Pompa) (leng 1.00 set 33,500,000.00
1 1/2''
ve 1 1/2''
1 1/2''
Gauge
rol pompa air bersih transfer
/Struktur reservoir Ground Water Tank (GWT) kap. 2x50 m3 & rumah pompa 1.00 ls By SIPIL
IH di Atap
1.00 set 1,250,000.00
e 1 1/2 '' 7.00 bh 420,000.00
Fiber kap. 2000 liter ukuran : dia. 1.45 tinggi 1.5 meter lengkap dengan peralatan 2.00 unit 6,055,577.50
el Control 2.00 unit 850,000.00
mpa Booster air bersih kap. 5m3/jam Total head 45 meter 0,816Kw lengkap deng 1.00 unit 14,916,600.00
Sub Jumlah Instalasi Air Bersih
2 3 4 5 6
er 12 mm² O2 ~ 1/2" OD 70.00 m' 126,379.31
er 15 mm² O2 ~ 5/8" OD 58.00 m' 163,017.24
er 20 mm² O2 ~ 3/4" OD 55.00 m' 211,206.90
er 25 mm² O2 ~ 1" OD 65.00 m' 271,206.90
medis Vacuum 29.00 bh 1,365,900.00
er 8 mm² Vacuum ~ 3/8" OD 58.00 m' 100,689.66
er 12 mm² Vacuum ~ 1/2" OD 72.50 m' 126,379.31
er 15 mm² VAcuum ~ 5/8" OD 55.00 m' 163,017.24
er 20 mm² Vacuum ~ 3/4" OD 115.00 m' 211,206.90
medis Compressed Air 4 bar 18.00 bh 1,365,900.00
er 8 mm² Compessed Air 4 bar ~ 3/8" OD 36.00 m' 100,689.66
er 12 mm² Compessed Air 4 bar ~ 1/2" OD 45.00 m' 126,379.31
er 15 mm² Compessed Air 4 bar ~ 5/8" OD 35.00 m' 163,017.24
er 20 mm² Compessed Air 4 bar 3/4" OD 118.00 m' 211,206.90
medis Nitrous Oksida 12.00 bh 1,365,900.00
er 8 mm² Nitrous Oksida ~ 3/8" OD 24.00 m' 100,689.66
er 12 mm² Nitrous Oksida ~ 1/2" OD 30.00 m' 126,379.31
er 15 mm² Nitrous Oksida ~ 5/8" OD 35.00 m' 163,017.24
er 20 mm² Nitrous Oksida ~ 3/4" OD 118.00 m' 211,206.90
medis karbon dioksida 12.00 bh 1,365,900.00
er 8 mm² karbon dioksida ~ 3/8" OD 24.00 m' 100,689.66
er 12 mm² karbon dioksida ~ 1/2" OD 30.00 m' 126,379.31
er 15 mm² karbon dioksida ~ 5/8" OD 34.00 m' 163,017.24
er 20 mm² karbon dioksida ~ 3/4" OD 118.00 m' 211,206.90
Valve 5 Line 1.00 unit 9,831,250.00
2 3 4 5 6
ea Alarm 5 gas 1.00 unit 17,793,737.50
porting 1.00 ls 19,435,553.86
1 2
A PEKERJAAN STRUKTUR GEDUNG
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PONDASI
III PEKERJAAN STRUKTUR
IV PEKERJAAN PLAT LANTAI
V PEKERJAAN TANGGA
VI PEKERJAAN ATAP
Sub Jumlah Pekerjaan Struktur Gedung
B PEKERJAAN STRUKTUR SELASAR
I PEKERJAAN PENDAHULUAN
II PEKERJAAN PONDASI
III PEKERJAAN STRUKTUR
IV PEKERJAAN PLAT LANTAI
V PEKERJAAN ATAP
Sub Jumlah Pekerjaan Struktur Selasar
C PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
II PEKERJAAN LANTAI
III PEKERJAAN PLAFON
IV PEKERJAAN PINTU DAN JENDELA
V PEKERJAAN SANITAIR
VI PEKERJAAN PENGECATAN
VII PEKERJAAN LAIN-LAIN
VIII ARSITEKTUR FASADE BANGUNAN
Sub Jumlah Pekerjaan Arsitektur
D PEKERJAAN MEKANIKAL ELEKTRIKAL
01 INSTALASI PENERANGAN DAN KOTAK KONTAK LANTAI 1 & 2
02 INSTALASI TATA UDARA / AC LANTAI 1 & 2
03 INSTALASI TELEPHONE LANTAI 1 & 2
04 INSTALASI FIRE ALARM LANTAI 1 & 2
05 INSTALASI KABEL DATA KOMPUTER LANTAI 1 & 2
06 INSTALASI CCTV LANTAI 1 & 2
07 AIR BEKAS, KOTOR DAN VENT LANTAI 1 & 2
1 2
08 AIR BERSIH LANTAI 1 & 2
09 PENANGGULANGAN KEBAKARAN
1 2
10 SALURAN AIR HUJAN
11 DUMBWAITER
Sub Jumlah Pekerjaan Mekanikal Elektrikal
JUMLAH TOTAL
PPN 10 %
JUMLAH TOTAL + PPN 10 %
DIBULATKAN
Empat Belas Milyar Lima Ratus Lima Puluh Empat Juta Sembilan Pul
TERBILANG :
Rupiah
75,994,910.20
1,731,424,937.46
2,111,625,166.59
925,832,017.93
73,253,468.56
389,478,228.92
5,307,608,729.66
2,881,494.00
144,571,456.74
262,891,251.51
71,649,052.44
45,449,587.11
527,442,841.80
1,257,348,243.80
841,965,162.65
508,354,768.55
1,400,507,331.49
157,240,838.75
212,452,595.42
41,239,438.26
237,428,996.55
4,656,537,375.48
1,216,349,176.27
560,639,724.50
29,151,450.00
62,213,140.00
17,543,848.00
29,415,400.00
162,046,183.00
3
566,905,015.20
11,184,000.00
3
51,208,165.00
162,300,000.00
2,868,956,101.97
13,360,545,048.90
1,336,054,504.89
14,696,599,553.79
14,696,599,000.00
Belas Milyar Lima Ratus Lima Puluh Empat Juta Sembilan Puluh Empat Ribu
Mengetahui Oleh :
Kepala RSUD Dokter Agoesdjam
Kabupaten Ketapang
UPAH TENAGA
Keuntungan & Jasa
NO. TENAGA KERJA KODE KERJALainnya(13.5%)
( Rp/Hari )( Rp/Hari )
1 Pekerja tak terlatih 75,600.00
###
2 Tukang ###
99,750.00
3 Kepala tukang ###
99,750.00
4 Mandor ###
99,750.00
###
###
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
KODE
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA
1 2 3 4 5
A PEKERJAAN STRUKTUR GEDUNG
I PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank 2.2.1.4.a 128.00 M'
2 Pembongkaran 1.00 Lsm
3 Pagar Sementara 2.2.1.2.a 171.40 M'
4 Papan Nama Proyek 1.00 Lsm
Sub Jumlah I
II PEKERJAAN PONDASI
1 Pengadaan Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 597.00 Btg
450 -6 m
2 Pemancangan Mini Pile 25 x 25 K450 3,582.00 M'
3 Pembobokan Mini Pile 199.00 Titik
4 Galian Tanah Pondasi 2.3.1.1 104.79 M³
5 Urugan Pasir t = 10 cm 2.3.1.11 12.33 M³
6 Lantai Kerja t = 5 cm 4.1.1.4 6.16 M³
7 Poer Type P2
- Beton Ready Mix K-300 B. 13.i.2 3.47 M³
- Tulangan U32 4.1.1.17.b 296.34 Kg
- Bekisting Pondasi 4.1.1.20.a 13.16 M²
8 Poer Type P3
- Beton Ready Mix K-300 B. 13.i.2 3.14 M³
- Tulangan U32 4.1.1.17.b 211.65 Kg
- Bekisting Pondasi 4.1.1.20.a 7.98 M²
9 Poer Type P4
- Beton Ready Mix K-300 B. 13.i.2 16.82 M³
- Tulangan U32 4.1.1.17.b 1,574.46 Kg
- Bekisting Pondasi 4.1.1.20.a 43.40 M²
10 Poer Type P6
- Beton Ready Mix K-300 B. 13.i.2 4.99 M³
- Tulangan U32 4.1.1.17.b 326.04 Kg
- Bekisting Pondasi 4.1.1.20.a 10.78 M²
1 2 3 4 5
11 Poer Type P7
- Beton Ready Mix K-300 B. 13.i.2 14.81 M³
- Tulangan U32 4.1.1.17.b 892.79 Kg
- Bekisting Pondasi 4.1.1.20.a 25.76 M²
12 Poer Type P9
- Beton Ready Mix K-300 B. 13.i.2 18.52 M³
- Tulangan U32 4.1.1.17.b 1,115.98 Kg
- Bekisting Pondasi 4.1.1.20.a 32.20 M²
13 Poer Type P12
- Beton Ready Mix K-300 B. 13.i.2 24.55 M³
- Tulangan U32 4.1.1.17.b 1,416.86 Kg
- Bekisting Pondasi 4.1.1.20.a 37.45 M²
14 Kolom Pondasi K1 Uk. 45x45 cm
- Beton Ready Mix K-225 B. 13.f.2 4.25 M³
- Tulangan U32 4.1.1.17.b 1,722.01 Kg
- Tulangan U24 4.1.1.17.a 167.82 Kg
- Bekisting Pondasi 4.1.1.20.a 37.80 M²
Sub Jumlah II
III PEKERJAAN STRUKTUR
Struktur Lantai 1
1 Sloof Uk. 35x60 cm
- Beton Ready Mix K-225 B. 13.f.2 51.44 M³
- Tulangan U32 4.1.1.17.b 10,291.28 Kg
- Tulangan U24 4.1.1.17.a 2,056.54 Kg
- Bekisting Sloof 4.1.1.21.a 396.83 M²
1 2 3 4 5
2 Sloof Uk. 25x50 cm
- Beton Ready Mix K-225 B. 13.f.2 18.30 M³
- Tulangan U32 4.1.1.17.b 2,342.60 Kg
- Tulangan U24 4.1.1.17.a 626.81 Kg
- Bekisting Sloof 4.1.1.21.a 192.10 M²
3 Sloof Uk. 20x40 cm
- Beton Ready Mix K-225 B. 13.f.2 2.05 M³
- Tulangan U32 4.1.1.17.b 298.75 Kg
- Tulangan U24 4.1.1.17.a 90.56 Kg
- Bekisting Sloof 4.1.1.21.a 27.39 M²
4 Sloof Uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.54 M³
- Tulangan U32 4.1.1.17.b 76.42 Kg
- Tulangan U24 4.1.1.17.a 29.03 Kg
- Bekisting Sloof 4.1.1.21.a 9.08 M²
5 Tutup Kolong Uk.10x30 cm (blk.35/60)
- Beton Ready Mix K-225 B. 13.f.2 3.46 M³
- Wiremesh M6 4.1.1.19 192.49 Kg
- Bekisting Sloof 4.1.1.21.a 69.24 M²
- Plesteran Tutup Kolong Uk.10x30 cm (blk.35/60) 4.4.2.4 49.40 M²
6 Tutup Kolong Uk.10/50 (blk.20/40)
- Beton Ready Mix K-225 B. 13.f.2 0.36 M³
- Wiremesh M6 4.1.1.19 18.14 Kg
- Bekisting Sloof 4.1.1.21.a 7.25 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 4.89 M²
7 Kolom K1 Uk. 45x45 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 20.66 M³
- Tulangan U32 4.1.1.17.b 3,612.60 Kg
- Tulangan U24 4.1.1.17.a 700.91 Kg
- Bekisting Kolom 4.1.1.22 b 183.60 M²
8 Kolom K2 Uk. 30x30 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 0.65 M³
- Tulangan U32 4.1.1.17.b 113.69 Kg
- Tulangan U24 4.1.1.17.a 19.75 Kg
- Bekisting Kolom 4.1.1.22 b 8.64 M²
9 Kolom Praktis Uk.9x9 cm Lt.1
- Beton K175 4.1.1.4 6.33 M³
- Tulangan U24 4.1.1.17.a 1,577.16 Kg
- Bekisting 4.1.1.20.a 70.31 M²
10 Balok Praktis Uk.9x9 cm Lt.1 (dinding)
- Beton K175 4.1.1.4 0.47 M³
1 2 3 4 5
- Tulangan U24 4.1.1.17.a 115.98 Kg
- Bekisting 4.1.1.20.a 5.21 M²
Struktur Lantai 1
Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.110
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.36 M³
- Tulangan U32 4.1.1.17.b 726.66 Kg
- Tulangan U24 4.1.1.17.a 251.69 Kg
- Bekisting Balok 4.1.1.23.b 79.54 M²
2 List Plat Dack elv. 3.110
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 12.57 M³
- Wiremesh 2xM7 4.1.1.19 710.07 Kg
- Bekisting Lantai 4.1.1.24.b 146.98 M²
- Plesteran List Plat Dack elv. 3.110 4.4.2.4 262.03 M²
3 Balok Uk. 35x60 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 51.08 M³
- Tulangan U32 4.1.1.17.b 10,291.28 Kg
- Tulangan U24 4.1.1.17.a 2,042.21 Kg
- Bekisting Balok 4.1.1.23.b 394.07 M²
4 Balok Uk. 25x50 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 17.50 M³
- Tulangan U32 4.1.1.17.b 2,241.55 Kg
- Tulangan U24 4.1.1.17.a 599.43 Kg
- Bekisting Balok 4.1.1.23.b 183.70 M²
1 2 3 4 5
5 Balok Uk. 20x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 2.53 M³
- Tulangan U32 4.1.1.17.b 361.24 Kg
- Tulangan U24 4.1.1.17.a 111.40 Kg
- Bekisting Balok 4.1.1.23.b 33.72 M²
6 Balok Uk. 15x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.54 M³
- Tulangan U32 4.1.1.17.b 75.79 Kg
- Tulangan U24 4.1.1.17.a 28.80 Kg
- Bekisting Balok 4.1.1.23.b 9.00 M²
7 Kolom K1 Uk. 45x45 cm (elv.4.00-8.00) Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 20.96 M³
- Tulangan U32 4.1.1.17.b 3,211.20 Kg
- Tulangan U24 4.1.1.17.a 710.78 Kg
- Bekisting Kolom 4.1.1.22 b 186.30 M²
8 Kolom K2 Uk. 30x30 cm (elv.4.00-8.00) Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.65 M³
- Tulangan U32 4.1.1.17.b 113.69 Kg
- Tulangan U24 4.1.1.17.a 19.75 Kg
- Bekisting Kolom 4.1.1.22 b 8.64 M²
9 Kolom Praktis Uk.9x9 cm Lt.2
- Beton K175 4.1.1.4 4.96 M³
- Tulangan U24 4.1.1.17.a 1,235.56 Kg
- Bekisting 4.1.1.20.a 55.08 M²
10 Balok Praktis Uk.9x9 cm Lt.2
- Beton K175 4.1.1.4 0.70 M³
- Tulangan U24 4.1.1.17.a 172.14 Kg
- Bekisting 4.1.1.20.a 7.74 M²
elv.4.500
11 Balok Uk. 15x40 cm elv.4.5
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.53 M³
- Tulangan U32 4.1.1.17.b 510.96 Kg
- Tulangan U24 4.1.1.17.a 179.29 Kg
- Bekisting Balok 4.1.1.23.b 56.63 M²
12 Kolom Praktis Uk.9x9 cm elv.4.5
- Beton K175 4.1.1.4 0.31 M³
- Tulangan U24 4.1.1.17.a 79.88 Kg
- Bekisting 4.1.1.20.a 6.91 M²
13 List Plat Dack elv. 4.5
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.44 M³
- Wiremesh 2xM7 4.1.1.19 397.22 Kg
1 2 3 4 5
- Bekisting Lantai 4.1.1.24.b 57.35 M²
- Plesteran List Plat Dack elv. 4.5 4.4.2.4 101.28 M²
elv.7.20
19 List Dack elv.7.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.12 M³
- Wiremesh 2xM7 4.1.1.19 547.71 Kg
- Bekisting Lantai 4.1.1.24.b 70.71 M²
- Plesteran List Dack elv. 7.20 4.4.2.4 79.07 M²
20 Balok List dack Uk.15x40 elv.7.20
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.93 M³
- Tulangan U32 4.1.1.17.b 564.33 Kg
- Tulangan U24 4.1.1.17.a 195.05 Kg
- Bekisting Balok 4.1.1.23.b 78.04 M²
Elv.7.60
21 Balok uk. 20x80 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 5.13 M³
- Tulangan U32 4.1.1.17.b 745.75 Kg
- Tulangan U24 4.1.1.17.a 156.22 Kg
- Bekisting Balok 4.1.1.23.b 36.66 M²
22 Balok uk. 25x55 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.38 M³
- Tulangan U32 4.1.1.17.b 471.81 Kg
- Tulangan U24 4.1.1.17.a 116.05 Kg
- Bekisting Balok 4.1.1.23.b 35.44 M²
1 2 3 4 5
23 Balok uk. 20x45 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.54 M³
- Tulangan U32 4.1.1.17.b 162.48 Kg
- Tulangan U24 4.1.1.17.a 44.90 Kg
- Bekisting Balok 4.1.1.23.b 16.12 M²
24 Balok uk. 20x40 cm Elv.7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 2.71 M³
- Tulangan U32 4.1.1.17.b 299.22 Kg
- Tulangan U24 4.1.1.17.a 89.53 Kg
- Bekisting Balok 4.1.1.23.b 33.85 M²
25 Plat Dack elv. 7.60
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.86 M³
- Wiremesh 2xM7 4.1.1.19 405.24 Kg
- Bekisting Lantai 4.1.1.24.b 22.21 M²
- Plesteran Plat Dack elv. 7.60 4.4.2.4 22.21 M²
- Acian Plat Dack elv. 7.60 4.4.2.27 22.21 M²
- Waterproofing Plat Dack elv. 7.60 A.4.7.1.10.f 22.21 M²
Elv.8.00
26 Balok uk. 25x55 cm Elv.8.00
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 26.50 M³
- Tulangan U32 4.1.1.17.b 3,518.01 Kg
- Tulangan U24 4.1.1.17.a 907.70 Kg
- Bekisting Balok 4.1.1.23.b 278.25 M²
27 Kolom K4 Uk. 15x15 cm el,8.00
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.16 M³
- Tulangan U32 4.1.1.17.b 60.02 Kg
- Tulangan U24 4.1.1.17.a 8.22 Kg
- Bekisting Kolom 4.1.1.22 b 2.16 M²
28 Kolom Praktis Uk.9x9 cm elv.8.00
- Beton K175 4.1.1.4 0.04 M³
- Tulangan U24 4.1.1.17.a 9.99 Kg
- Bekisting 4.1.1.20.a 0.86 M²
29 Balok Praktis Uk.9x9 cm elv.8.00
- Beton K175 4.1.1.4 1.85 M³
- Tulangan U24 4.1.1.17.a 41.04 Kg
- Bekisting 4.1.1.20.a 20.50 M²
Elv.9.80
30 Balok uk. 20x40 cm Elv.9.80
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.20 M³
- Tulangan U32 4.1.1.17.b 132.64 Kg
- Tulangan U24 4.1.1.17.a 39.90 Kg
1 2 3 4 5
- Bekisting Balok 4.1.1.23.b 15.00 M²
31 Plat Dack elv. 9.80
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 1.66 M³
- Wiremesh 2xM7 4.1.1.19 138.78 Kg
- Bekisting Lantai 4.1.1.24.b 13.64 M²
- Plesteran Plat Dack 4.4.2.4 13.64 M²
- Acian Plat Dack 4.4.2.27 13.64 M²
- Waterproofing Plat Dack A.4.7.1.10.f 13.64 M²
Struktur Lantai 2
Sub Jumlah III
IV PEKERJAAN PLAT LANTAI
1 Plat Lantai 1
- Beton Ready Mix K-225 t =12 cm B. 13.f.2 107.63 M³
- Wiremesh 2xM7 4.1.1.19 7,480.15 Kg
- Bekisting Lantai 4.1.1.24.c 721.82 M²
2 Plat Lantai 2
- Beton Ready Mix K-225 t =12 cm menggunakan pompa B. 13.f.1 103.90 M³
- Wiremesh 2xM7 4.1.1.19 7,221.06 Kg
- Bekisting Lantai 4.1.1.24.b 709.70 M²
Sub Jumlah IV
1 2 3 4 5
V PEKERJAAN TANGGA
Tangga Type T1 (2 Unit)
1 Balok Bordes uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.31 M³
- Tulangan U32 4.1.1.17.b 50.53 Kg
- Tulangan U24 4.1.1.17.a 19.67 Kg
- Bekisting Balok 4.1.1.23.b 6.48 M²
- Plesteran Balok Bordes 15/40 4.4.2.4 6.48 M²
2 Plat Bordes
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 1.31 M³
- Tulangan U24 4.1.1.17.a 173.55 Kg
- Bekisting Balok 4.1.1.23.b 6.62 M²
- Plesteran Bawah Bordes 15/40 4.4.2.4 6.62 M²
3 Plat Tangga
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 3.20 M³
- Tulangan U24 4.1.1.17.a 612.01 Kg
- Bekisting Plat 4.1.1.24.b 22.89 M²
- Plesteran Bawah Plat tangga 15/40 4.4.2.4 22.89 M²
4 Anak Tangga
- Beton Ready Mix K-225 B. 13.f.2 1.73 M³
- Wiremesh M6 4.1.1.19 345.28 Kg
- Bekisting 4.1.1.21.a 11.52 M²
Tangga Type T2 (1 Unit)
1 Balok Bordes uk. 15x40 cm
- Beton Ready Mix K-225 B. 13.f.2 0.16 M³
- Tulangan U32 4.1.1.17.b 25.26 Kg
- Tulangan U24 4.1.1.17.a 9.84 Kg
- Bekisting Balok 4.1.1.23.b 3.24 M²
- Plesteran Balok Bordes 15/40 4.4.2.4 3.24 M²
2 Plat Bordes
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³
- Tulangan U24 4.1.1.17.a 86.78 Kg
- Bekisting Balok 4.1.1.23.b 6.40 M²
- Plesteran Bawah Bordes 15/40 4.4.2.4 6.40 M²
3 Plat Tangga
- Beton Ready Mix K-225 t = 14 cm B. 13.f.2 2.07 M³
- Tulangan U24 4.1.1.17.a 394.96 Kg
- Bekisting Plat 4.1.1.24.b 29.60 M²
- Plesteran Bawah Plat tangga 15/40 4.4.2.4 29.60 M²
4 Anak Tangga
- Beton Ready Mix K-225 B. 13.f.2 1.12 M³
1 2 3 4 5
- Wiremesh M6 4.1.1.19 223.28 Kg
- Bekisting 4.1.1.21.a 7.45 M²
Sub Jumlah V
VI PEKERJAAN ATAP
1 Rangka Atap Baja Ringan Zincallume 8.1.1.3. 905.04 M2
2 Atap Zincallume Color t =0,35 mm A.4.5.2.41.b 905.04 M2
3 Prabung Atap Zincallume A.4.5.2.42.a 64.20 M
4 List Plank Woodplak 2 lps 8.1.1.4. 125.20 M
Sub Jumlah VI
JUMLAH TOTAL PEKERJAAN STRUKTUR
B PEKERJAAN STRUKTUR SELASAR
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Bowplank 2.2.1.4.a 44.00 M'
Sub Jumlah I
II PEKERJAAN PONDASI
1 Pengadaan Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 48.00 Btg
450 -6 m
2 Pemancangan Mini Pile 25 x 25 K450 288.00 M'
3 Pembobokan Mini Pile 16.00 Titik
4 Galian Tanah Pondasi 2.3.1.1 6.66 M³
5 Urugan Pasir t = 10 cm 2.3.1.11 0.78 M³
6 Lantai Kerja t = 5 cm 4.1.1.4 0.39 M³
7 Poer Type P1
- Beton Ready Mix K-300 B. 13.i.2 2.02 M³
- Tulangan U32 4.1.1.17.b 219.65 Kg
- Bekisting Pondasi 4.1.1.20.a 13.44 M²
1 2 3 4 5
8 Poer Type P2
- Beton Ready Mix K-300 B.13.i.2 3.47 M³
- Tulangan U32 4.1.1.17.b 296.34 Kg
- Bekisting Pondasi 4.1.1.20.a 13.16 M²
9 Kolom Pondasi K2 Uk. 30x30 cm
- Beton Ready Mix K-225 B. 13.f.2 0.76 M³
- Tulangan U32 4.1.1.17.b 325.15 Kg
- Tulangan U24 4.1.1.17.a 42.98 Kg
- Bekisting Pondasi 4.1.1.20.a 10.08 M²
Sub Jumlah II
III PEKERJAAN STRUKTUR
Struktur Lantai 1
1 Sloof Uk. 20x40 cm
- Beton Ready Mix K-225 B. 13.f.2 3.48 M³
- Tulangan U32 4.1.1.17.b 486.73 Kg
- Tulangan U24 4.1.1.17.a 153.26 Kg
- Bekisting Sloof 4.1.1.21.a 46.44 M²
2 Tutup Kolong Uk.10/50 (blk.20/40)
- Beton Ready Mix K-225 B. 13.f.2 1.88 M³
- Wiremesh M6 4.1.1.19 94.14 Kg
- Bekisting Sloof 4.1.1.21.a 37.63 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 24.20 M²
3 Kolom K2 Uk. 30x30 cm Lt.1
- Beton Ready Mix K-225 B. 13.f.2 3.89 M³
- Tulangan U32 4.1.1.17.b 682.13 Kg
- Tulangan U24 4.1.1.17.a 118.50 Kg
- Bekisting Kolom 4.1.1.22 b 51.84 M²
Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.20
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 2.33 M³
- Tulangan U32 4.1.1.17.b 268.11 Kg
- Tulangan U24 4.1.1.17.a 92.43 Kg
- Bekisting Balok 4.1.1.23.b 29.14 M²
2 List Plat Dack elv. 3.3.20
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.64 M³
- Wiremesh 2xM7 4.1.1.19 260.71 Kg
- Bekisting Lantai 4.1.1.24.b 54.17 M²
- Plesteran List Plat Dack elv. 3.20 4.4.2.4 96.62 M²
3 Balok Uk. 20x40 cm Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.59 M³
- Tulangan U32 4.1.1.17.b 508.04 Kg
1 2 3 4 5
- Tulangan U24 4.1.1.17.a 158.00 Kg
- Bekisting Balok 4.1.1.23.b 47.88 M²
4 Kolom K2 Uk. 30x30 cm (elv.4.00-7.95) Lt.2
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 4.27 M³
- Tulangan U32 4.1.1.17.b 682.13 Kg
- Tulangan U24 4.1.1.17.a 129.56 Kg
- Bekisting Kolom 4.1.1.22 b 56.88 M²
elv.7.95
5 Balok Uk. 20x45 elv.7.95
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 0.60 M³
- Tulangan U32 4.1.1.17.b 62.53 Kg
- Tulangan U24 4.1.1.17.a 17.81 Kg
- Bekisting Balok 4.1.1.23.b 6.30 M²
6 Balok Uk. 20x40 elv.7.95
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 3.32 M³
- Tulangan U32 4.1.1.17.b 459.49 Kg
- Tulangan U24 4.1.1.17.a 146.28 Kg
- Bekisting Balok 4.1.1.23.b 44.32 M²
7 Plat Dack elv.7.95
- Beton Ready Mix K-225 menggunakan pompa B. 13.f.1 6.34 M³
- Wiremesh 2xM7 4.1.1.19 528.76 Kg
- Bekisting Lantai 4.1.1.24.b 52.32 M²
- Plesteran Plat Dack 4.4.2.4 126.80 M²
- Acian Plat Dack 4.4.2.27 63.40 M²
- Waterproofing Plat Dack A.4.7.1.10.f 63.40 M²
Sub Jumlah III
1 2 3 4 5
IV PEKERJAAN PLAT LANTAI
1 Plat Lantai 1
- Beton Ready Mix K-225 t = 10 cm B. 13.f.2 7.22 M³
- Wiremesh 2xM7 4.1.1.19 602.15 Kg
- Bekisting Lantai 4.1.1.24.c 60.57 M²
2 Plat Lantai 2
- Beton Ready Mix K-225 t = 10 cm menggunakan pompa B. 13.f.1 7.22 M³
- Wiremesh 2xM7 4.1.1.19 602.15 Kg
- Bekisting Lantai 4.1.1.24.b 60.23 M²
Sub Jumlah IV
V PEKERJAAN ATAP
1 Rangka Atap Baja Ringan Zincallume 8.1.1.3. 90.54 M2
2 Atap Zincallume Color t =0,35 mm A.4.5.2.41.b 90.54 M2
3 Prabung Atap Zincallume A.4.5.2.42.a 21.46 M
4 List Plank Woodplak 2 lps 8.1.1.4. 42.80 M
Sub Jumlah V
JUMLAH TOTAL PEKERJAAN STRUKTUR SELASAR
C PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
A Lantai 1
1 Pas. Dinding Batako A.4.4.1.19.a 1,437.95 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 2,833.10 m2
3 Pas. Dinding Keramik 20x40 Cm A.4.4.3.54.a 144.25 m2
4 Pas. Dinding Wastafel Keramik 30x30 Motif A.4.4.3.35.a 1.81 m2
5 Pas. Timbal Pelapis (PB) 2 mm Dinding + Partisi Triplek A.X-Ray 251.32 m2
B Lantai 2
1 Pas. Dinding Batako A.4.4.1.19.a 1,046.98 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 2,060.27 m2
3 Pas. Dinding Keramik 20x40 Cm A.4.4.3.54.a 83.98 m2
4 Pas. Dinding Wastafel Keramik 30x30 Motif A.4.4.3.35.a 113.46 m2
C Lantai Atap
1 Pas. Dinding Batako A.4.4.1.19.a 42.20 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 84.41 m2
D Koridor
1 Pas. Dinding Batako A.4.4.1.19.a 259.96 m2
2 Pas. Plesteran 1:4 A.4.4.2.4 519.92 m2
Sub Jumlah I
II PEKERJAAN LANTAI
1 2 3 4 5
A Lantai 1
1 Pas. Lantai Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 131.14 m2
2 Pas. Lantai Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 27.36 m2
3 Pas. Lantai Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 494.45 m2
4 Pas. Lantai Keramik 30x30 Cm Polised A.4.4.3.35. 44.29 m2
5 Pas. Lantai Keramik 30x30 Cm Unpolised A.4.4.3.35.a 27.00 m2
6 Pas. Lantai Vinyl Homogeneous Heavy Duty A.4.4.3.59.a 175.94 m2
7 Pas. Lantai Tangga
a. Pas. Lantai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 42.39 m2
b. Stepnosing A.4.4.3.41 81.12 m'
8 Pas. Hospital Plint A.4.4.3.21 623.30 m'
B Lantai 2
1 Pas. Lantai Keramik 60x60 Cm Unpolised Tekstur Kasar A.4.4.3.34.b 103.79 m2
2 Pas. Lantai Keramik 60x60 Cm Polised Tipe 1 A.4.4.3.34.a 17.28 m2
3 Pas. Lantai Keramik 60x60 Cm Polised Tipe 2 A.4.4.3.34.a 589.50 m2
4 Pas. Lantai Keramik 30x30 Cm Polised A.4.4.3.35 53.17 m2
5 Pas. Lantai Keramik 30x30 Cm Unpolised A.4.4.3.35.a 25.92 m2
6 Pas. Lantai Vinyl Homogeneous Heavy Duty A.4.4.3.59.a 71.04 m2
7 Pas. Lantai Tangga
a. Pas. Lantai Keramik 30x30 Cm Unpolised Antislip A.4.4.3.35.a 18.05 m2
b. Stepnosing A.4.4.3.41 34.56 m'
8 Pas. Hospital Plint A.4.4.3.21 513.51 m'
Sub Jumlah II
1 2 3 4 5
III PEKERJAAN PLAFON
A Lantai 1
1 Pas. Plafond Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 674.60 m2
2 Pas. Plafond GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 26.18 m2
3 Pas. Plafond Timbal Pelapis (PB) 2 mm + Partisi Gypsum A.X-Ray 115.12 m2
B Lantai 2
1 Pas. Plafond Gypsumboard 9 Mm Rangka Metal Furing A.4.5.1.7 846.05 m2
2 Pas. Plafond GRC Wet Area 4 Mm Rangka Metal Furing A.4.5.1.7.a 26.96 m2
Sub Jumlah III
IV PEKERJAAN PINTU DAN JENDELA
A Lantai 1
Pintu :
1 PU1 234x250 cm (Kaca Tempered Frameless 12mm) U&B 2.00 Unit
- Pas. ACP Gawang U&B 65.41 m2
1 2 3 4 5
- Engsel Pintu A.4.6.2.5 72.00 Set
- Lever Handle A.4.6.2.11.a 18.00 Set
- Kunci lockcase A.4.6.2.1.a 18.00 Set
- Door Stoper A.4.6.2.13 18.00 Set
- Door Closer A.4.6.2.10 18.00 Set
- Kaca 5 mm A.4.6.2.17 7.20 m2
1 2 3 4 5
8 P5 107,5x270 cm 1.00 Unit
- Kusen A.4.2.1.11 7.55 m'
- Daun Pintu A.4.6.1.8.a 1.85 m2
- Engsel Pintu A.4.6.2.5 4.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set
- Door Closer A.4.6.2.10 1.00 Set
- Kaca 5 mm A.4.6.2.17 0.51 m2
1 2 3 4 5
- Door Stoper A.4.6.2.13 1.00 Set
1 2 3 4 5
Jendela :
1 J1 360x220 cm 9.00 Unit
- Kusen A.4.2.1.11 228.60 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 15.78 m2
- Kaca 5 mm A.4.6.2.17 50.73 m2
- Casement Handle A.4.6.2.11.b 18.00 Set
- Friction Stay A.4.6.2.9 36.00 Set
1 2 3 4 5
- Friction Stay A.4.6.2.9 2.00 Set
1 2 3 4 5
B Lantai 2
Pintu :
1 PD1 167,5x270 cm (Kaca Tempered Frameless 12mm) U&B 4.00 Unit
1 2 3 4 5
- Door Closer A.4.6.2.10 1.00 Set
1 2 3 4 5
Jendela :
1 J1A 360x160 cm 8.00 Unit
- Kusen A.4.2.1.11 150.40 m'
- Daun Jendela kaca 5 mm A.4.2.1.13.b 14.03 m2
- Kaca 5 mm A.4.6.2.17 28.44 m2
- Casement Handle A.4.6.2.11.b 16.00 Set
- Friction Stay A.4.6.2.9 32.00 Set
1 2 3 4 5
8 V2 140x54 cm 18.00 Unit
- Kusen A.4.2.1.11 79.56 m'
- Kaca 5 mm A.4.6.2.17 14.47 m2
C Lantai Atap
Pintu :
1 P7 97,5x220 cm 1.00 Unit
- Kusen A.4.2.1.11 5.37 m'
- Daun Pintu A.4.6.1.8.a 2.14 m2
- Engsel Pintu A.4.6.2.5 4.00 Set
- Lever Handle A.4.6.2.11.a 1.00 Set
- Kunci lockcase A.4.6.2.1.a 1.00 Set
- Door Stoper A.4.6.2.13 1.00 Set
- Door Closer A.4.6.2.10 1.00 Set
Sub Jumlah IV
V PEKERJAAN SANITAIR
A Lantai 1
1 Pas. Closet Duduk tipe 1 A.5.1.1.1 7.00 set
2 Pas. Shower Spray A.5.1.1.19.a 7.00 set
3 Pas. Floor Drain A.5.1.1.14 8.00 set
4 Pas. Wastafel wall hung tipe 1 A.5.1.1.5 3.00 set
1 2 3 4 5
5 Pas. Wastafel wall hung tipe 2 A.5.1.1.5.a 9.00 set
6 Pas. Sink 1 Lubang dengan Petirasan A.5.1.1.12 1.00 set
7 Pas. Kran Pantry A.5.1.1.19 1.00 set
8 Pas. Grab bar U&B 3.00 set
9 Pas. Grab bar Difable U&B 3.00 set
10 Pas. Spoel Hoek A.5.1.1.1.a 1.00 set
11 Pas. Kaca Cermin 5 mm ex. Lokal A.4.6.2.20 8.19 m2
12 Pas. Meja Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.11 m3
B Lantai 2
1 Pas. Closet Duduk tipe 1 A.5.1.1.1 3.00 set
2 Pas. Shower Spray A.5.1.1.19.a 3.00 set
3 Pas. Floor Drain A.5.1.1.14 5.00 set
4 Pas. Wastafel wall hung tipe 2 A.5.1.1.5.a 10.00 set
5 Pas. Wastafel counter top lavatory A.5.1.1.5.a 1.00 set
6 Pas. Sink 1 Lubang dengan Petirasan A.5.1.1.12 15.00 set
7 Pas. Kran Pantry A.5.1.1.19 15.00 set
8 Pas. Spoel Hoek A.5.1.1.1.a 2.00 set
9 Pas. Slob Sink A.5.1.1.1.a 1.00 set
10 Pas. Kaca Cermin 5 mm ex. Lokal A.4.6.2.20 4.68 m2
11 Pas. Meja Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 5.94 m3
12 Interior Melekat Bahan Multipleks Fin. HPL 100.04 m'
Sub Jumlah V
VI PEKERJAAN PENGECATAN
A Lantai 1
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 471.08 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 1,482.81 m2
3 Cat Plafond A.4.7.1.10.a 981.06 m2
B Lantai 2
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 590.21 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 1,806.22 m2
3 Cat Plafond A.4.7.1.10.a 770.00 m2
C Lantai Atap
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 44.22 m2
2 Cat Dinding Dalam (easy clean) A.4.7.1.10.a 42.20 m2
D Koridor
1 Cat Dinding Luar (weathershield) A.4.7.1.10.b 619.08 m2
2 Cat Plafond A.4.7.1.10.a 131.14 m2
1 2 3 4 5
Sub Jumlah VI
VII PEKERJAAN LAIN-LAIN
A Lantai 1
1 Pekerjaan Tangga :
a. Pas. Handrail dan Railling tangga 1 A.4.2.1.20.a 25.37 m2
b. Pas. Handrail dan Railling tangga 2 A.4.2.1.20.a 22.39 m2
2 Interior Melekat Meja Konter Bahan Multipleks Fin. HPL 5.66 m'
B Lantai 2
1 Pekerjaan Tangga :
a. Pas. Handrail dan Railling ( Void ) A.4.2.1.20.a 23.77 m2
Sub Jumlah VII
VIII ARSITEKTUR FASADE BANGUNAN
1 Pas. ACP Flat Tebal 0.3 mm + Pemasangan U&B 124.68 m2
2 Pas. Jalusi Aluminium U&B 79.04 m2
3 Pas. Signage :
- INSTALASI RADIOLOGI 1,033.20 cm
- INSTALASI LABORATORIUM 1,205.40 cm
Sub Jumlah VIII
JUMLAH TOTAL PEKERJAAN ARSITEKTUR
1 2 3 4 5
D PEKERJAAN MEKANIKAL ELEKTRIKAL
01 Instalasi Penerangan dan Kotak Kontak Lantai 1 & 2
Lantai 1
Kabel NYM 2 x 2.5 mm² dalam High Impact conduit dia. 20 mm
Instalasi penerangan 151.00 titik
1 Downlight LED Inbow 6 W 14.00 bh
2 Downlight LED Inbow 10 W 58.00 bh
3 Downlight LED Inbow 10 W + Nicad Batery 6.00 bh
4 Downlight LED Inbow 13 W 59.00 bh
5 Downlight LED Inbow 13 W+ Nicad Batery 8.00 bh
6 Lampu Led Baret Circular 10 W 6.00 bh
7 Sakelar Ganda 38.00 bh
8 Sakelar Tunggal 15.00 bh
9 Lampu Exit + baterai 2.00 bh
Kabel NYM 3x2.5 mm² dalam High Impact conduit dia. 20 mm
10 Instalasi kotak kontak 1p 101.00 titik
11 Instalasi Listrik Door full Hermatik 8.00 titik
12 Outlet kotak kontak dinding 1p 99.00 bh
13 Outlet kotak kontak lantai 2.00 bh
Lantai 2
Kabel NYM 2 x 2.5 mm² dalam High Impact conduit dia. 20 mm
Instalasi penerangan 163.00 titik
14 Downlight LED Inbow 6 W 4.00 bh
15 Downlight LED Inbow 10 W 34.00 bh
16 Downlight LED Inbow 10 W + Nicad Batery 2.00 bh
17 Downlight LED Inbow 13 W 96.00 bh
18 Downlight LED Inbow 13 W+ Nicad Batery 9.00 bh
19 Lampu Led Baret Circular 10 W 18.00 bh
20 Sakelar Ganda 30.00 bh
21 Sakelar Tunggal 10.00 bh
22 Lampu Exit + baterai 2.00 bh
Kabel NYM 3x2.5 mm² dalam High Impact conduit dia. 20 mm
23 Instalasi kotak kontak 1p 134.00 titik
24 Outlet kotak kontak dinding 1p 108.00 bh
25 Outlet kotak kontak Universal 9.00 bh
26 Outlet kotak kontak lantai 26.00 bh
Pekerjaan Grounding Listrik
26 BC 50 mm 105.00 meter
27 Sumuran grounding arus kuat tahanan maksimal 2 ohm 3.00 unit
Panel dan Kabel Feeder
Panel
1 2 3 4 5
28 SUB DISTRIBUSI PANEL IPRS (Wall mounted) (DIGEDUNG PANEL LV-MDP EKSISTING 1.00 Lot
29 SUB DISTRIBUSI PANEL RAD & LAB (Wall mounted) Lengkap dengan : set
Box Panel Ukuran 1200 x 80 x 25 cm 1.00 bh
MCCB 350A - 500A, 36kA, 3P 1.00 bh
MCCB 250A, 18kA, 3P 1.00 bh
MCCB 75A, 10kA, 3P 1.00 bh
MCCB 60A, 7,5kA, 3P 1.00 bh
MCCB 50A, 7,5kA, 3P 2.00 bh
MCB 10A, 3P, 10 kA 1.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Surge Arester tipe 1 3P+N 1.00 bh
Skun kabel + Material bantu 1.00 lot
1 2 3 4 5
30 SUB DISTRIBUSI PANEL CT SCAN & MRI(Wall mounted) Lengkap dengan : 1.00 set
Box Panel Ukuran 60 x 80 x 20 cm 1.00 bh
MCCB 350A, 36kA, 3P 1.00 bh
MCCB 250A, 18kA, 3P 2.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Surge Arester tipe 1 3P+N 1.00 bh
Skun kabel + Material bantu 1.00 lot
1 2 3 4 5
MCCB 50A, 7,5kA, 3P 1.00 bh
MCCB 25A, 6kA, 3P 1.00 bh
MCB 20A, 4,5kA, 1P 1.00 bh
MCB 10A, 4,5kA, 1P 4.00 bh
MCB 16A, 4,5kA, 1P 12.00 bh
MCB 4A, 4,5kA, 1P 9.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
1 2 3 4 5
35 POWER PANEL AC 2 (Wall mounted)
Box Panel Ukuran 50 x 70 x 20 cm 1.00 bh
MCCB 75A, 10kA, 3P 1.00 bh
MCB 20A, 6kA, 3P 2.00 bh
MCCB 10A, 4,5kA, 1P 8.00 bh
MCB 16A, 4,5kA, 1P 7.00 bh
MCB 6A, 4,5kA, 1P 8.00 bh
Amper meter, 3CT + selector switch 1.00 bh
Volt meter + selector switch 1.00 bh
Sekring + Holder 3.00 bh
Lampu Tanda 3.00 bh
CU Bar 1.00 lot
Skun kabel + Material bantu 1.00 lot
Kabel Feeder
39 Kabel NYY 4 (4 x 150 mm²) (LV-MDP Gedung Eksisting - SDP IPRS )
40 Kabel NYFGBY 4 x 185 mm² (SDP IPRS - SDP. CT scan & Mri ) 154.00 m'
41 Kabel NYFGBY 2(4x120) mm² (SDP IPRS - SDP.Rad & lab) 142.00 m'
42 Kabel NYY 4 x 95 mm² ( SDP. CT scan & Mri - UPS CT SCAN - MESIN CT SCAN) m'
43 Kabel NYY 4 x 95 mm² ( SDP. CT scan & Mri - UPS MRI - MESIN MRI) m'
44 Kabel NYY 4 x 95 mm² ( SDP.Rad & lab - PP.X-RAY ) 55.00 m'
45 Kabel NYY 4 x 50 mm² ( PP.X-RAY - MESIN FLOUROSCOPY ) m'
46 Kabel NYY 4 x 35 mm² ( PP.X-RAY - MESIN X-RAY ) m'
47 Kabel NYY 4 x 50 mm² ( SDP.Rad & lab - UPS 80KVA- PP.UPS LAB) 74.00 m'
48 Kabel NYY 4x10 mm² (SDP.Rad & lab - PP LANTAI 1) 54.00 m'
1 2 3 4 5
49 Kabel NYY 4x10 mm² (SDP.Rad & lab - PP LANTAI 2) 20.00 m'
50 Kabel NYY 4x10 mm² (SDP.Rad & lab - PP AC 1) 54.00 m'
51 Kabel NYY 4x16 mm² (SDP.Rad & lab - PP AC 2) 20.00 m'
52 Kabel NYY 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 1 42.00 m'
53 Kabel NYY 4x4 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m'
54 Kabel NYY 3x4 mm² (PP LANTAI 2 - POMPA BOOSTER) 102.00 m'
55 Kabel NYY 4x4 mm² (PP Lantai 1 - Mamografi) 33.00 m'
56 Kabel NYY 3x4 mm² (PP Lantai 1 - Panaromig) 43.00 m'
57 Kabel NYY 3x4 mm² (PP LANTAI 2 - P. RO) 72.00 m'
58 Kabel NYY 4x4 mm² (PP- AC Lantai 2 - AC LAB 1) 105.00 m'
59 Kabel NYY 4x4 mm² (PP- AC Lantai 2 - AC LAB 2) 106.00 m'
1 2 3 4 5
1 2 3 4 5
3 Air Conditioning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 4.00 unit
4 Air Conditioning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 4.00 unit
5 Air Conditioning split Kap. 12.500 BTUH / 1 1/2 pk tipe wall mounted 1.00 unit
6 Air Conditioning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 4.00 unit
7 Air Conditioning split Kap. 18000 BTUH / 2 pk tipe Ceiling Casette 1.00 unit
8 Outlet Stop kontak AC 1 phase 25.00 bh
9 Pipa referigerant 1/4″ + 3/8″ + Isolasi 190.00 m'
10 Pipa referigerant 1/4″ + 1/2″ + Isolasi 60.00 m'
11 Pipa Drain PVC AW 1 1/4" + Isolasi 64.00 m'
12 Pipa Drain PVC AW 1'' + Isolasi 40.00 m'
13 Pipa Drain PVC AW 3/4'' + Isolasi 125.00 m'
instalasi ac lantai 2
14 Instalasi Power AC 1 Fasa (NYM 3x2.5 mm²) 21.00 titik
15 Air Conditioning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 7.00 unit
16 Air Conditioning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 1.00 unit
17 Air Conditioning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 4.00 unit
18 Air Conditioning split Kap. 12.500 BTUH / 1 1/2 pk tipe wall mounted 5.00 unit
19 Air Conditioning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 2.00 unit
20 Outlet Stop kontak AC 1 phase 21.00 bh
21 Pipa referigerant 1/4″ + 3/8″ + Isolasi 120.00 m'
22 Pipa referigerant 1/4″ + 1/2″ + Isolasi 70.00 m'
23 Pipa Drain PVC AW 1 1/4" + Isolasi 59.00 m'
24 Pipa Drain PVC AW 1'' + Isolasi 72.00 m'
25 Pipa Drain PVC AW 3/4'' + Isolasi 95.00 m'
1 2 3 4 5
26 Air Conditioning split Duct. 60.000 BTUH lengkap 2.00 lot
Instalasi ducting Ruang Lab
Supply air duct bahan Polyurethane c/w supporting
- ukuran 25 x 30 cm
- ukuran 25x 60 cm
- ukuran 25 x 80 cm
Return air duct bahan Polyurethane c/w supporting
- ukuran 25 x 30 cm
- ukuran 25x 60 cm
- ukuran 25 x 80 cm
- Plenum box
Diffuser SAG 500 cfm( 4 buah)
RAG 50 x 35 500 cfm(4 buah)
Volume Damper
FAN Lantai 1 & 2
27 Instalasi Power FAN 1 Fasa (NYM 3x2.5 mm²) 20.00 titik
28 Pipa PVC kelas D dia. 100 mm atau 4" 66.00 m'
29 Alumunium flexible ducting 4 inch 22.00 m'
30 Grill Exchaust fan Toilet ukuran 20 x 20 cm 6.00 bh
31 Ceiling Exhausth Fan tipe sirocco 50 cfm 11.00 unit
32 Industrial Wall Exchaust FAN 10" kap. 300 CFM 0.4 in wg low noise c/w asesories 9.00 unit
Sub Jumlah Instalasi Pengkondisian Udara / AC
03 Instalasi Telephone Lantai 1 & 2
Instalasi Kabel ITC 2x0.6mm² dalam High Impact conduit dia. 20 mm
1 Instalasi Telephone 17.00 titk
2 Hand set Telephone single line 17.00 bh
3 Outlet Telephone dinding 1 Pole 17.00 bh
Peralatan Utama
4 Unit utama PABX kap. 8 co line 32Extention lengkap dengan : 1.00 set
- Main Unit PABX, Power suplai, memory card, Extension card, analog card
- Pemasangan & Pemrograman
5 Box MDF c/w frame & LSA40 Ext. 1.00 set
6 Kabel ITC 20x2x0.6mm² (MDF - PABX) 75.00 m'
Sub Jumlah Instalasi Telephone
04 Instalasi Fire Alarm Lantai 1 & 2
Kabel NYA 2x1x1.5 mm² dalam High Impact conduit dia. 20 mm
1 Instalasi Heat Detector type Rate Of Rise (ROR) 69.00 titik
2 Heat detector ROR 48.00 bh
3 Smoke Detector 21.00 bh
4 End of Line 6.00 unit
Peralatan Utama
1 2 3 4 5
5 Main Control Fire Alarm (MCFA) tipe konvensional 10 Zone lengkap dengan peralatan 1.00 unit
6 Pemrograman MCFA 1.00 unit
7 UPS 1200 VA 1.00 ls
Sub Jumlah Instalasi Fire Alarm
05 Instalasi Kabel Data Komputer Lantai 1 & 2
Wifi hotspot
1 Kabel UTP Cat 6 dalam High Impact conduit dia. 20 mm
2 Instalasi Kabel Data Wifi 4.00 titik
3 Wifi Access Point 802,11n - 2,4GHz/5GHz R11 Meter 4.00 bh
4 Instalasi Kotak Kontak untuk Wifi (NYM 3x2,5mm2) 4.00 titik
5 Kotak Kontak Outbow 4.00 bh
6 Managed Switch Hub untuk UTP cat 6. kap 8 Port 2.00 bh
7 Instalasi power Switch Hub & Kotak Kontak. 2.00 bh
8 Instalasi Switch/ Hub ke Hub Consentrator Ke eksisting 1.00 titik
Sub Jumlah Instalasi Kabel Data Komputer
06 Instalasi CCTV Lantai 1 & 2
Kabel COAXIAL. RG 59 18AWG BC 95% dengan kabel power dalam High Impact conduit dia. 20 mm
1 Instalasi Kamera CCTV 7.00 titik
2 High Resolution Dome Camera high resolution lengkap dengan Power adaptor & asesori 7.00 bh
3 High Resolution In door Box CCD Camera day and night lengkap dengan Power adaptor 1.00 bh
Peralatan utama / Sentral CCTV
sentral CCTV lengkap dengan peralatan, pemasangan, pengkabelan & asesories
4 DVR Card Kap. 8 Channel C/W Hard Disks 2 terrabyte 1.00 unit
5 TV Monitor 32 inch 1.00 unit
6 UPS 2000 VA 1.00 ls
7 Meja CCTV 1.00 ls
Sub Jumlah Instalasi CCTV
1 2 3 4 5
07 Air Bekas, Kotor dan Vent Lantai 1 & 2
PIPA PVC AW lengkap dengan fitting, bobokan & Penggantung
Lantai 1 & 2
1 Pipa PVC kelas AW dia. 150 mm atau 6" 51.00 m'
2 Pipa PVC kelas AW dia. 100 mm atau 4" 330.00 m'
3 Pipa PVC kelas AW dia. 80 mm atau 3" 72.00 m'
4 Pipa PVC kelas AW dia. 50 mm atau 2" 48.00 m'
5 Pipa PVC kelas AW dia.32 mm atau 1 1/4" 66.00 m'
6 Portable Grease trap pelat stainless ukuran (Pxlxt) 50x30x45 cm 1.00 unit
7 Bak Penampung infeksius kap. 3 m3 1.00 unit
- Galian
- struktur beton & Tutup beton
- Peralatan penetral logam
- finishing
8 Bak Penampung(Sumpit) kap. 2,5 m3 1.00 unit
- Galian
- struktur beton & Tutup beton
- Peralatan penetral logam
- finishing
9 Pompa Celup Sewage Kapasitas 100 L/m lengkap dengan instalasi power + aksesoris p 2.00 unit
10 Septictank Bio Limbah rumah sakit Kapasitas 2.000 Liter Lengkap dengan 2.00 unit
Galian & seling pengikat
Cairan pengurai dan tablet disinfeksikan
Penutup Septictank Bio (dinding Bata) + Tutup Plat besi 1,2 mm unit
11 Manhole bak 30X30 Clean out 4 inci(area lantai 1) 9.00 Lot
Tutup manhole dak bak bata/plesteran
Clean out 4 inci
elbow 4 inci
12 Clean out 4 inci (area lantai 2) 6.00 bh
13 Fitting + Supporting(Gantungan Pipa Besi Siku 50mm, Dynabolt, Mur & baut ) 1.00 lot
Site Plan
14 Pengadaan & pemasangan sistem IPAL
Sub Jumlah Instalasi Air Bekas, Kotor & Vent
08 Air Bersih Lantai 1 & 2
PIPA PPR PN 10 lengkap dengan fitting, bobokan & Penggantung
Lantai 1 & 2
1 Pipa PPR PN 10 dia. 50 atau 1 1/2 " (ruang pompa ke roof tank) 90.00 m'
2 Pipa PPR PN 10 dia. 50 atau 1 1/2 " 50.00 m'
3 Pipa PPR PN 10 dia. 40 atau 1 1/4 " 151.00 m'
4 Pipa PPR PN 10 dia. 32 atau 1 " 140.00 m'
5 Pipa PPR PN 10 dia. 25 atau 3/4" 45.00 m'
1 2 3 4 5
6 Pipa PPR PN 10 dia. 20 atau 1/2" 220.00 m'
7 Gate Valve dia. 50 atau 1 1/2 " 2.00 bh
8 Gate Valve dia. 40 atau 1 1/4 " 3.00 bh
9 Fitting + Supporting(Gantungan Pipa Besi Siku 50mm, Dynabolt, Mur & baut ) 1.00 lot
POMPA TRANSFER AIR BERSIH
10 Paket Pompa Transfer air bersih kap. 8m3/jam Total head 40 meter 4 kw (1 Pompa) (len 1.00 set
Gate valve 1 1/2''
Check valve 1 1/2''
Foot Valve 1 1/2''
Pressure Gauge
Panel kontrol pompa air bersih transfer
11 Bangunan/Struktur reservoir Ground Water Tank (GWT) kap. 2x40 m3 & rumah pompa 1.00 ls
1 2 3 4 5
AIR BERSIH
Reverse di AtapSystem Lengkap dengan
Osmosis
12 Light Commercial Reverse Osmosis 1.00 set
a Stainless Steel Membrane vessel 4040 Seamless
Membrane Reverse Osmosis 2000gpd
Feeder Pump Shimizhu 135
Stainless steel Frame Hollow 40x40 1,2mm
Vertical Multistage Centrifugal
Flow Meter 5gpm
Gate valve 3/4 Bronze
Pressure Gauge 5bar
Pressure Gauge 15bar
Selenoid bronze inline 3/4"
Timer w/t auto flushing
Sediment 20" 1 mikron blue
High Pressure Swicth
piping PVC rucika AW before housing membrane
Reducer pressure system
Pre-Treatment
b Fiber Tube FRP 1054 polypropelene
Lengkap dengan
Fiber Tube FRP 1354 polypropelene Softener
Multimedia Filter, P. Silica
Carbon Home ( Srilangka )
ResinFilter
Pre Softener Lewatit
Cartrige 20"
Sediment 20" 5 mikron blue
Sediment 20" 1 mikron blue
Pump
Horizontal
Pipa Pump Maxon multistage
Instalasi
PVC sebelum
Elektrikal proses
Instalasi filterisasi, pembuangan & limbah
1phase
c Panel 30x40
MCB
Relay
Nol Arde
Terminal
Pilot Lamp
Swicth Controller
d Ultraviolet Unitec 12gpm w/t alarm
1 2 3 4 5
14 Cleaning In place Lengkap dengan 1.00 set
Chemical Cleaning RO123
Piping & valve for cleaning
Circulation Valve Pvc 3/4
1 2 3 4 5
09 Penanggulangan Kebakaran
1 Fire Extinguisher kap. 3 Kg Klass ABC tipe CO2 6.00 unit
Sub Jumlah Instalasi Penanggulangan Kebakaran
10 Saluran air hujan
1 Pipa PVC kelas AW dia. 150 mm atau 6" 115.00 m'
1 Pipa PVC kelas AW dia. 100 mm atau 4" 105.00 m'
3 Roof Drain dia. 100 mm atau 4" 7.00 bh
4 Fitting + Supporting 1.00 lot
5 Saluran drainase tipe terbuka lengkap dengan : m'
6 Bak Kontrol 50X50 bh
Sub Jumlah Instalasi Saluran Air Hujan
11 Dumbwaiter
1 Dumbwaiter Kapasitas 100 Kg 2 lantai Termasuk Biaya ongkos kirim & jasa 1.00 unit
Ukuran Box 700(w) x 700(D) x 800(H)
2 Pekerjaan sipil Untuk Dumb waiter (beam,wp,baja & asseories) 1.00 lot
Sub Jumlah Instalasi Dumbwaiter
JUMLAH TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL
2 3 4 5 6
AAN STRUKTUR GEDUNG
AAN PENDAHULUAN
gan Bowplank 2.2.1.4.a 128.00 M' 65,488.50
karan 1.00 Lsm 15,000,000.00
mentara 2.2.1.2.a 171.40 M' 304,623.00
ma Proyek 1.00 Lsm 400,000.00
Sub Jumlah I
AAN PONDASI
n Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 597.00 Btg 1,600,000.00
2 3 4 5 6
P7
Ready Mix K-300 B. 13.i.2 14.81 M³ 1,682,037.50
gan U32 4.1.1.17.b 892.79 Kg 18,317.75
ing Pondasi 4.1.1.20.a 25.76 M² 135,487.00
P9
Ready Mix K-300 B. 13.i.2 18.52 M³ 1,682,037.50
gan U32 4.1.1.17.b 1,115.98 Kg 18,317.75
ing Pondasi 4.1.1.20.a 32.20 M² 135,487.00
P12
Ready Mix K-300 B. 13.i.2 24.55 M³ 1,682,037.50
gan U32 4.1.1.17.b 1,416.86 Kg 18,317.75
ing Pondasi 4.1.1.20.a 37.45 M² 135,487.00
ndasi K1 Uk. 45x45 cm
Ready Mix K-225 B. 13.f.2 4.25 M³ 1,513,737.50
gan U32 4.1.1.17.b 1,722.01 Kg 18,317.75
gan U24 4.1.1.17.a 167.82 Kg 16,585.25
ing Pondasi 4.1.1.20.a 37.80 M² 135,487.00
Sub Jumlah II 1
AAN STRUKTUR
Lantai 1
35x60 cm
Ready Mix K-225 B. 13.f.2 51.44 M³ 1,513,737.50
gan U32 4.1.1.17.b 10,291.28 Kg 18,317.75
gan U24 4.1.1.17.a 2,056.54 Kg 16,585.25
ing Sloof 4.1.1.21.a 396.83 M² 135,487.00
2 3 4 5 6
25x50 cm
Ready Mix K-225 B. 13.f.2 18.30 M³ 1,513,737.50
gan U32 4.1.1.17.b 2,342.60 Kg 18,317.75
gan U24 4.1.1.17.a 626.81 Kg 16,585.25
ing Sloof 4.1.1.21.a 192.10 M² 135,487.00
20x40 cm
Ready Mix K-225 B. 13.f.2 2.05 M³ 1,513,737.50
gan U32 4.1.1.17.b 298.75 Kg 18,317.75
gan U24 4.1.1.17.a 90.56 Kg 16,585.25
ing Sloof 4.1.1.21.a 27.39 M² 135,487.00
15x40 cm
Ready Mix K-225 B. 13.f.2 0.54 M³ 1,513,737.50
gan U32 4.1.1.17.b 76.42 Kg 18,317.75
gan U24 4.1.1.17.a 29.03 Kg 16,585.25
ing Sloof 4.1.1.21.a 9.08 M² 135,487.00
ong Uk.10x30 cm (blk.35/60)
Ready Mix K-225 B. 13.f.2 3.46 M³ 1,513,737.50
mesh M6 4.1.1.19 192.49 Kg 13,993.65
ing Sloof 4.1.1.21.a 69.24 M² 135,487.00
ran Tutup Kolong Uk.10x30 cm (blk.35/60) 4.4.2.4 49.40 M² 71,177.04
ong Uk.10/50 (blk.20/40)
Ready Mix K-225 B. 13.f.2 0.36 M³ 1,513,737.50
mesh M6 4.1.1.19 18.14 Kg 13,993.65
ing Sloof 4.1.1.21.a 7.25 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 4.89 M² 71,177.04
Uk. 45x45 cm Lt.1
Ready Mix K-225 B. 13.f.2 20.66 M³ 1,513,737.50
gan U32 4.1.1.17.b 3,612.60 Kg 18,317.75
gan U24 4.1.1.17.a 700.91 Kg 16,585.25
ing Kolom 4.1.1.22 b 183.60 M² 224,636.50
Uk. 30x30 cm Lt.1
Ready Mix K-225 B. 13.f.2 0.65 M³ 1,513,737.50
gan U32 4.1.1.17.b 113.69 Kg 18,317.75
gan U24 4.1.1.17.a 19.75 Kg 16,585.25
ing Kolom 4.1.1.22 b 8.64 M² 224,636.50
ktis Uk.9x9 cm Lt.1
K175 4.1.1.4 6.33 M³ 996,598.84
gan U24 4.1.1.17.a 1,577.16 Kg 16,585.25
ing 4.1.1.20.a 70.31 M² 135,487.00
ktis Uk.9x9 cm Lt.1 (dinding)
K175 4.1.1.4 0.47 M³ 996,598.84
2 3 4 5 6
gan U24 4.1.1.17.a 115.98 Kg 16,585.25
ing 4.1.1.20.a 5.21 M² 135,487.00
Struktur Lantai 1
Lantai 2
Dack Uk.15/40 elv. 3.110
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.36 M³ 2,041,737.50
gan U32 4.1.1.17.b 726.66 Kg 18,317.75
gan U24 4.1.1.17.a 251.69 Kg 16,585.25
ing Balok 4.1.1.23.b 79.54 M² 228,085.00
ack elv. 3.110
Ready Mix K-225 menggunakan pompa B. 13.f.1 12.57 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 710.07 Kg 13,993.65
ing Lantai 4.1.1.24.b 146.98 M² 253,676.50
ran List Plat Dack elv. 3.110 4.4.2.4 262.03 M² 71,177.04
35x60 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 51.08 M³ 2,041,737.50
gan U32 4.1.1.17.b 10,291.28 Kg 18,317.75
gan U24 4.1.1.17.a 2,042.21 Kg 16,585.25
ing Balok 4.1.1.23.b 394.07 M² 228,085.00
25x50 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 17.50 M³ 2,041,737.50
gan U32 4.1.1.17.b 2,241.55 Kg 18,317.75
gan U24 4.1.1.17.a 599.43 Kg 16,585.25
ing Balok 4.1.1.23.b 183.70 M² 228,085.00
2 3 4 5 6
20x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 2.53 M³ 2,041,737.50
gan U32 4.1.1.17.b 361.24 Kg 18,317.75
gan U24 4.1.1.17.a 111.40 Kg 16,585.25
ing Balok 4.1.1.23.b 33.72 M² 228,085.00
15x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.54 M³ 2,041,737.50
gan U32 4.1.1.17.b 75.79 Kg 18,317.75
gan U24 4.1.1.17.a 28.80 Kg 16,585.25
ing Balok 4.1.1.23.b 9.00 M² 228,085.00
Uk. 45x45 cm (elv.4.00-8.00) Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 20.96 M³ 2,041,737.50
gan U32 4.1.1.17.b 3,211.20 Kg 18,317.75
gan U24 4.1.1.17.a 710.78 Kg 16,585.25
ing Kolom 4.1.1.22 b 186.30 M² 224,636.50
Uk. 30x30 cm (elv.4.00-8.00) Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.65 M³ 2,041,737.50
gan U32 4.1.1.17.b 113.69 Kg 18,317.75
gan U24 4.1.1.17.a 19.75 Kg 16,585.25
ing Kolom 4.1.1.22 b 8.64 M² 224,636.50
ktis Uk.9x9 cm Lt.2
K175 4.1.1.4 4.96 M³ 996,598.84
gan U24 4.1.1.17.a 1,235.56 Kg 16,585.25
ing 4.1.1.20.a 55.08 M² 135,487.00
ktis Uk.9x9 cm Lt.2
K175 4.1.1.4 0.70 M³ 996,598.84
gan U24 4.1.1.17.a 172.14 Kg 16,585.25
ing 4.1.1.20.a 7.74 M² 135,487.00
15x40 cm elv.4.5
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.53 M³ 2,041,737.50
gan U32 4.1.1.17.b 510.96 Kg 18,317.75
gan U24 4.1.1.17.a 179.29 Kg 16,585.25
ing Balok 4.1.1.23.b 56.63 M² 228,085.00
ktis Uk.9x9 cm elv.4.5
K175 4.1.1.4 0.31 M³ 996,598.84
gan U24 4.1.1.17.a 79.88 Kg 16,585.25
ing 4.1.1.20.a 6.91 M² 135,487.00
ack elv. 4.5
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.44 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 397.22 Kg 13,993.65
2 3 4 5 6
ing Lantai 4.1.1.24.b 57.35 M² 253,676.50
ran List Plat Dack elv. 4.5 4.4.2.4 101.28 M² 71,177.04
elv.7.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.12 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 547.71 Kg 13,993.65
ing Lantai 4.1.1.24.b 70.71 M² 253,676.50
ran List Dack elv. 7.20 4.4.2.4 79.07 M² 71,177.04
dack Uk.15x40 elv.7.20
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.93 M³ 2,041,737.50
gan U32 4.1.1.17.b 564.33 Kg 18,317.75
gan U24 4.1.1.17.a 195.05 Kg 16,585.25
ing Balok 4.1.1.23.b 78.04 M² 228,085.00
20x80 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 5.13 M³ 2,041,737.50
gan U32 4.1.1.17.b 745.75 Kg 18,317.75
gan U24 4.1.1.17.a 156.22 Kg 16,585.25
ing Balok 4.1.1.23.b 36.66 M² 228,085.00
25x55 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.38 M³ 2,041,737.50
gan U32 4.1.1.17.b 471.81 Kg 18,317.75
gan U24 4.1.1.17.a 116.05 Kg 16,585.25
ing Balok 4.1.1.23.b 35.44 M² 228,085.00
2 3 4 5 6
20x45 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.54 M³ 2,041,737.50
gan U32 4.1.1.17.b 162.48 Kg 18,317.75
gan U24 4.1.1.17.a 44.90 Kg 16,585.25
ing Balok 4.1.1.23.b 16.12 M² 228,085.00
20x40 cm Elv.7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 2.71 M³ 2,041,737.50
gan U32 4.1.1.17.b 299.22 Kg 18,317.75
gan U24 4.1.1.17.a 89.53 Kg 16,585.25
ing Balok 4.1.1.23.b 33.85 M² 228,085.00
elv. 7.60
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.86 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 405.24 Kg 13,993.65
ing Lantai 4.1.1.24.b 22.21 M² 253,676.50
ran Plat Dack elv. 7.60 4.4.2.4 22.21 M² 71,177.04
Plat Dack elv. 7.60 4.4.2.27 22.21 M² 44,682.00
proofing Plat Dack elv. 7.60 A.4.7.1.10.f 22.21 M² 26,582.05
25x55 cm Elv.8.00
Ready Mix K-225 menggunakan pompa B. 13.f.1 26.50 M³ 2,041,737.50
gan U32 4.1.1.17.b 3,518.01 Kg 18,317.75
gan U24 4.1.1.17.a 907.70 Kg 16,585.25
ing Balok 4.1.1.23.b 278.25 M² 228,085.00
Uk. 15x15 cm el,8.00
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.16 M³ 2,041,737.50
gan U32 4.1.1.17.b 60.02 Kg 18,317.75
gan U24 4.1.1.17.a 8.22 Kg 16,585.25
ing Kolom 4.1.1.22 b 2.16 M² 224,636.50
ktis Uk.9x9 cm elv.8.00
K175 4.1.1.4 0.04 M³ 996,598.84
gan U24 4.1.1.17.a 9.99 Kg 16,585.25
ing 4.1.1.20.a 0.86 M² 135,487.00
ktis Uk.9x9 cm elv.8.00
K175 4.1.1.4 1.85 M³ 996,598.84
gan U24 4.1.1.17.a 41.04 Kg 16,585.25
ing 4.1.1.20.a 20.50 M² 135,487.00
20x40 cm Elv.9.80
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.20 M³ 2,041,737.50
gan U32 4.1.1.17.b 132.64 Kg 18,317.75
gan U24 4.1.1.17.a 39.90 Kg 16,585.25
2 3 4 5 6
ing Balok 4.1.1.23.b 15.00 M² 228,085.00
elv. 9.80
Ready Mix K-225 menggunakan pompa B. 13.f.1 1.66 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 138.78 Kg 13,993.65
ing Lantai 4.1.1.24.b 13.64 M² 253,676.50
ran Plat Dack 4.4.2.4 13.64 M² 71,177.04
Plat Dack 4.4.2.27 13.64 M² 44,682.00
proofing Plat Dack A.4.7.1.10.f 13.64 M² 26,582.05
Struktur Lantai 2 1
Sub Jumlah III
AAN PLAT LANTAI
i1
Ready Mix K-225 t =12 cm B. 13.f.2 107.63 M³ 1,513,737.50
mesh 2xM7 4.1.1.19 7,480.15 Kg 13,993.65
ing Lantai 4.1.1.24.c 721.82 M² 228,613.00
i2
Ready Mix K-225 t =12 cm menggunakan pompa B. 13.f.1 103.90 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 7,221.06 Kg 13,993.65
ing Lantai 4.1.1.24.b 709.70 M² 253,676.50
Sub Jumlah IV
2 3 4 5 6
AAN TANGGA
pe T1 (2 Unit)
des uk. 15x40 cm
Ready Mix K-225 B. 13.f.2 0.31 M³ 1,513,737.50
gan U32 4.1.1.17.b 50.53 Kg 18,317.75
gan U24 4.1.1.17.a 19.67 Kg 16,585.25
ing Balok 4.1.1.23.b 6.48 M² 228,085.00
ran Balok Bordes 15/40 4.4.2.4 6.48 M² 71,177.04
s
Ready Mix K-225 t = 14 cm B. 13.f.2 1.31 M³ 1,513,737.50
gan U24 4.1.1.17.a 173.55 Kg 16,585.25
ing Balok 4.1.1.23.b 6.62 M² 228,085.00
ran Bawah Bordes 15/40 4.4.2.4 6.62 M² 71,177.04
ga
Ready Mix K-225 t = 14 cm B. 13.f.2 3.20 M³ 1,513,737.50
gan U24 4.1.1.17.a 612.01 Kg 16,585.25
ing Plat 4.1.1.24.b 22.89 M² 253,676.50
ran Bawah Plat tangga 15/40 4.4.2.4 22.89 M² 71,177.04
gga
Ready Mix K-225 B. 13.f.2 1.73 M³ 1,513,737.50
mesh M6 4.1.1.19 345.28 Kg 13,993.65
ing 4.1.1.21.a 11.52 M² 135,487.00
pe T2 (1 Unit)
des uk. 15x40 cm
Ready Mix K-225 B. 13.f.2 0.16 M³ 1,513,737.50
gan U32 4.1.1.17.b 25.26 Kg 18,317.75
gan U24 4.1.1.17.a 9.84 Kg 16,585.25
ing Balok 4.1.1.23.b 3.24 M² 228,085.00
ran Balok Bordes 15/40 4.4.2.4 3.24 M² 71,177.04
s
Ready Mix K-225 t = 14 cm B. 13.f.2 0.65 M³ 1,513,737.50
gan U24 4.1.1.17.a 86.78 Kg 16,585.25
ing Balok 4.1.1.23.b 6.40 M² 228,085.00
ran Bawah Bordes 15/40 4.4.2.4 6.40 M² 71,177.04
ga
Ready Mix K-225 t = 14 cm B. 13.f.2 2.07 M³ 1,513,737.50
gan U24 4.1.1.17.a 394.96 Kg 16,585.25
ing Plat 4.1.1.24.b 29.60 M² 253,676.50
ran Bawah Plat tangga 15/40 4.4.2.4 29.60 M² 71,177.04
gga
Ready Mix K-225 B. 13.f.2 1.12 M³ 1,513,737.50
2 3 4 5 6
mesh M6 4.1.1.19 223.28 Kg 13,993.65
ing 4.1.1.21.a 7.45 M² 135,487.00
Sub Jumlah V
AAN ATAP
ap Baja Ringan Zincallume 8.1.1.3. 905.04 M2 165,000.00
allume Color t =0,35 mm A.4.5.2.41.b 905.04 M2 235,235.00
tap Zincallume A.4.5.2.42.a 64.20 M 209,930.60
Woodplak 2 lps 8.1.1.4. 125.20 M 110,000.00
Sub Jumlah VI
JUMLAH TOTAL PEKERJAAN STRUKTUR 5
AAN STRUKTUR SELASAR
AAN PENDAHULUAN
Bowplank 2.2.1.4.a 44.00 M' 65,488.50
Sub Jumlah I
AAN PONDASI
n Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K U&B 48.00 Btg 1,600,000.00
2 3 4 5 6
P2
Ready Mix K-300 B.13.i.2 3.47 M³ 1,682,037.50
gan U32 4.1.1.17.b 296.34 Kg 18,317.75
ing Pondasi 4.1.1.20.a 13.16 M² 135,487.00
ndasi K2 Uk. 30x30 cm
Ready Mix K-225 B. 13.f.2 0.76 M³ 1,513,737.50
gan U32 4.1.1.17.b 325.15 Kg 18,317.75
gan U24 4.1.1.17.a 42.98 Kg 16,585.25
ing Pondasi 4.1.1.20.a 10.08 M² 135,487.00
Sub Jumlah II
AAN STRUKTUR
Lantai 1
20x40 cm
Ready Mix K-225 B. 13.f.2 3.48 M³ 1,513,737.50
gan U32 4.1.1.17.b 486.73 Kg 18,317.75
gan U24 4.1.1.17.a 153.26 Kg 16,585.25
ing Sloof 4.1.1.21.a 46.44 M² 135,487.00
ong Uk.10/50 (blk.20/40)
Ready Mix K-225 B. 13.f.2 1.88 M³ 1,513,737.50
mesh M6 4.1.1.19 94.14 Kg 13,993.65
ing Sloof 4.1.1.21.a 37.63 M² 135,487.00
ran Tutup Kolong Uk. 10/50 (blk.20/40) 4.4.2.4 24.20 M² 71,177.04
Uk. 30x30 cm Lt.1
Ready Mix K-225 B. 13.f.2 3.89 M³ 1,513,737.50
gan U32 4.1.1.17.b 682.13 Kg 18,317.75
gan U24 4.1.1.17.a 118.50 Kg 16,585.25
ing Kolom 4.1.1.22 b 51.84 M² 224,636.50
Lantai 2
Dack Uk.15/40 elv. 3.20
Ready Mix K-225 menggunakan pompa B. 13.f.1 2.33 M³ 2,041,737.50
gan U32 4.1.1.17.b 268.11 Kg 18,317.75
gan U24 4.1.1.17.a 92.43 Kg 16,585.25
ing Balok 4.1.1.23.b 29.14 M² 228,085.00
ack elv. 3.3.20
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.64 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 260.71 Kg 13,993.65
ing Lantai 4.1.1.24.b 54.17 M² 253,676.50
ran List Plat Dack elv. 3.20 4.4.2.4 96.62 M² 71,177.04
20x40 cm Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.59 M³ 2,041,737.50
gan U32 4.1.1.17.b 508.04 Kg 18,317.75
2 3 4 5 6
gan U24 4.1.1.17.a 158.00 Kg 16,585.25
ing Balok 4.1.1.23.b 47.88 M² 228,085.00
Uk. 30x30 cm (elv.4.00-7.95) Lt.2
Ready Mix K-225 menggunakan pompa B. 13.f.1 4.27 M³ 2,041,737.50
gan U32 4.1.1.17.b 682.13 Kg 18,317.75
gan U24 4.1.1.17.a 129.56 Kg 16,585.25
ing Kolom 4.1.1.22 b 56.88 M² 224,636.50
20x45 elv.7.95
Ready Mix K-225 menggunakan pompa B. 13.f.1 0.60 M³ 2,041,737.50
gan U32 4.1.1.17.b 62.53 Kg 18,317.75
gan U24 4.1.1.17.a 17.81 Kg 16,585.25
ing Balok 4.1.1.23.b 6.30 M² 228,085.00
20x40 elv.7.95
Ready Mix K-225 menggunakan pompa B. 13.f.1 3.32 M³ 2,041,737.50
gan U32 4.1.1.17.b 459.49 Kg 18,317.75
gan U24 4.1.1.17.a 146.28 Kg 16,585.25
ing Balok 4.1.1.23.b 44.32 M² 228,085.00
elv.7.95
Ready Mix K-225 menggunakan pompa B. 13.f.1 6.34 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 528.76 Kg 13,993.65
ing Lantai 4.1.1.24.b 52.32 M² 253,676.50
ran Plat Dack 4.4.2.4 126.80 M² 71,177.04
Plat Dack 4.4.2.27 63.40 M² 44,682.00
proofing Plat Dack A.4.7.1.10.f 63.40 M² 26,582.05
Sub Jumlah III
2 3 4 5 6
AAN PLAT LANTAI
i1
Ready Mix K-225 t = 10 cm B. 13.f.2 7.22 M³ 1,513,737.50
mesh 2xM7 4.1.1.19 602.15 Kg 13,993.65
ing Lantai 4.1.1.24.c 60.57 M² 228,613.00
i2
Ready Mix K-225 t = 10 cm menggunakan pompa B. 13.f.1 7.22 M³ 2,041,737.50
mesh 2xM7 4.1.1.19 602.15 Kg 13,993.65
ing Lantai 4.1.1.24.b 60.23 M² 253,676.50
Sub Jumlah IV
AAN ATAP
ap Baja Ringan Zincallume 8.1.1.3. 90.54 M2 165,000.00
allume Color t =0,35 mm A.4.5.2.41.b 90.54 M2 235,235.00
tap Zincallume A.4.5.2.42.a 21.46 M 209,930.60
Woodplak 2 lps 8.1.1.4. 42.80 M 110,000.00
Sub Jumlah V
JUMLAH TOTAL PEKERJAAN STRUKTUR SELASAR
AAN ARSITEKTUR
AAN DINDING
p
ng Batako A.4.4.1.19.a 42.20 m2 102,991.46
eran 1:4 A.4.4.2.4 84.41 m2 71,177.04
2 3 4 5 6
2 3 4 5 6
AAN PLAFON
70 cm 4.00 Unit
A.4.2.1.11 29.40 m' 109,840.50
Pintu A.4.6.1.8.a 7.94 m2 882,231.58
l Pintu A.4.6.2.5 16.00 Set 35,702.70
Handle A.4.6.2.11.a 4.00 Set 120,928.50
lockcase A.4.6.2.1.a 4.00 Set 241,785.50
Stoper A.4.6.2.13 4.00 Set 292,033.50
Closer A.4.6.2.10 4.00 Set 247,384.50
5 mm A.4.6.2.17 2.43 m2 220,227.70
70 cm 18.00 Unit
A.4.2.1.11 128.70 m' 109,840.50
Pintu A.4.6.1.8.a 34.65 m2 882,231.58
2 3 4 5 6
l Pintu A.4.6.2.5 72.00 Set 35,702.70
Handle A.4.6.2.11.a 18.00 Set 120,928.50
lockcase A.4.6.2.1.a 18.00 Set 241,785.50
Stoper A.4.6.2.13 18.00 Set 292,033.50
Closer A.4.6.2.10 18.00 Set 247,384.50
5 mm A.4.6.2.17 7.20 m2 220,227.70
20 cm 1.00 Unit
A.4.2.1.11 5.17 m' 109,840.50
Pintu A.4.6.1.8.a 1.70 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
Closer A.4.6.2.10 1.00 Set 247,384.50
2 3 4 5 6
270 cm 1.00 Unit
A.4.2.1.11 7.55 m' 109,840.50
Pintu A.4.6.1.8.a 1.85 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
Closer A.4.6.2.10 1.00 Set 247,384.50
5 mm A.4.6.2.17 0.51 m2 220,227.70
80 cm 1.00 Unit
A.4.2.1.11 4.37 m' 109,840.50
Pintu A.4.6.1.8.a 1.23 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
Closer A.4.6.2.10 1.00 Set 247,384.50
5 mm A.4.6.2.17 0.16 m2 220,227.70
00 cm 2.00 Unit
A.4.2.1.11 5.76 m' 109,840.50
Pintu A.4.6.1.8.a 0.88 m2 882,231.58
l Kupu-Kupu A.4.6.2.6 4.00 Set 25,264.25
e : Pull Plate A.4.6.2.11.b 2.00 Set 49,868.50
Pintu Window bolt with key A.4.6.2.4.a 2.00 Set 87,037.50
20 cm 4.00 Unit
A.4.2.1.11 20.80 m' 109,840.50
Pintu A.4.6.1.8.a 6.47 m2 882,231.58
l Pintu A.4.6.2.5 12.00 Set 35,702.70
Handle A.4.6.2.11.a 4.00 Set 120,928.50
lockcase A.4.6.2.1.a 4.00 Set 241,785.50
Stoper A.4.6.2.13 4.00 Set 292,033.50
20 cm 1.00 Unit
A.4.2.1.11 5.10 m' 109,840.50
Pintu A.4.6.1.8.a 1.42 m2 882,231.58
l Pintu A.4.6.2.5 3.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
2 3 4 5 6
Stoper A.4.6.2.13 1.00 Set 292,033.50
20 cm 2.00 Unit
A.4.2.1.11 10.60 m' 109,840.50
Pintu A.4.6.1.8.a 3.58 m2 882,231.58
l Pintu A.4.6.2.5 6.00 Set 35,702.70
Handle A.4.6.2.11.a 2.00 Set 120,928.50
lockcase A.4.6.2.1.a 2.00 Set 241,785.50
Stoper A.4.6.2.13 2.00 Set 292,033.50
80 cm 1.00 Unit
A.4.2.1.11 4.50 m' 109,840.50
Pintu A.4.6.1.8.a 1.43 m2 882,231.58
l Pintu A.4.6.2.5 3.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
2 3 4 5 6
0 cm 9.00 Unit
A.4.2.1.11 228.60 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 15.78 m2 566,362.50
5 mm A.4.6.2.17 50.73 m2 220,227.70
ment Handle A.4.6.2.11.b 18.00 Set 49,868.50
n Stay A.4.6.2.9 36.00 Set 33,863.50
0 cm 5.00 Unit
A.4.2.1.11 92.00 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 3.87 m2 566,362.50
5 mm A.4.6.2.17 20.71 m2 220,227.70
ment Handle A.4.6.2.11.b 5.00 Set 49,868.50
n Stay A.4.6.2.9 10.00 Set 33,863.50
70 cm 2.00 Unit
A.4.2.1.11 40.80 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 1.55 m2 566,362.50
5 mm A.4.6.2.17 10.60 m2 220,227.70
ment Handle A.4.6.2.11.b 2.00 Set 49,868.50
n Stay A.4.6.2.9 4.00 Set 33,863.50
0 cm 3.00 Unit
A.4.2.1.11 51.60 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 2.01 m2 566,362.50
5 mm A.4.6.2.17 10.82 m2 220,227.70
ment Handle A.4.6.2.11.b 3.00 Set 49,868.50
n Stay A.4.6.2.9 6.00 Set 33,863.50
0 cm 2.00 Unit
A.4.2.1.11 27.12 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 1.65 m2 566,362.50
5 mm A.4.6.2.17 5.45 m2 220,227.70
ment Handle A.4.6.2.11.b 2.00 Set 49,868.50
n Stay A.4.6.2.9 4.00 Set 33,863.50
0 cm 1.00 Unit
A.4.2.1.11 12.20 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 0.65 m2 566,362.50
5 mm A.4.6.2.17 2.17 m2 220,227.70
ment Handle A.4.6.2.11.b 1.00 Set 49,868.50
2 3 4 5 6
n Stay A.4.6.2.9 2.00 Set 33,863.50
0 cm 3.00 Unit
A.4.2.1.11 34.68 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 1.71 m2 566,362.50
5 mm A.4.6.2.17 5.73 m2 220,227.70
ment Handle A.4.6.2.11.b 3.00 Set 49,868.50
n Stay A.4.6.2.9 6.00 Set 33,863.50
0 cm 1.00 Unit
A.4.2.1.11 20.32 m' 109,840.50
5 mm A.4.6.2.17 4.35 m2 220,227.70
cm 3.00 Unit
A.4.2.1.11 7.44 m' 109,840.50
5 mm A.4.6.2.17 1.18 m2 220,227.70
4 cm 12.00 Unit
A.4.2.1.11 53.04 m' 109,840.50
5 mm A.4.6.2.17 9.64 m2 220,227.70
2 3 4 5 6
70 cm 3.00 Unit
A.4.2.1.11 22.05 m' 109,840.50
Pintu A.4.6.1.8.a 5.95 m2 882,231.58
l Pintu A.4.6.2.5 12.00 Set 35,702.70
Handle A.4.6.2.11.a 3.00 Set 120,928.50
lockcase A.4.6.2.1.a 3.00 Set 241,785.50
Stoper A.4.6.2.13 3.00 Set 292,033.50
Closer A.4.6.2.10 3.00 Set 247,384.50
5 mm A.4.6.2.17 1.82 m2 220,227.70
70 cm 15.00 Unit
A.4.2.1.11 107.25 m' 109,840.50
Pintu A.4.6.1.8.a 28.87 m2 882,231.58
l Pintu A.4.6.2.5 60.00 Set 35,702.70
Handle A.4.6.2.11.a 15.00 Set 120,928.50
lockcase A.4.6.2.1.a 15.00 Set 241,785.50
Stoper A.4.6.2.13 15.00 Set 292,033.50
Closer A.4.6.2.10 15.00 Set 247,384.50
5 mm A.4.6.2.17 6.00 m2 220,227.70
20 cm 1.00 Unit
A.4.2.1.11 5.17 m' 109,840.50
Pintu A.4.6.1.8.a 1.70 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
2 3 4 5 6
Closer A.4.6.2.10 1.00 Set 247,384.50
00 cm 2.00 Unit
A.4.2.1.11 5.76 m' 109,840.50
Pintu A.4.6.1.8.a 0.88 m2 882,231.58
l Kupu-Kupu A.4.6.2.6 4.00 Set 25,264.25
e : Pull Plate A.4.6.2.11.b 2.00 Set 49,868.50
Pintu Window bolt with key A.4.6.2.4.a 2.00 Set 87,037.50
20 cm 4.00 Unit
A.4.2.1.11 20.80 m' 109,840.50
Pintu A.4.6.1.8.a 5.90 m2 882,231.58
l Pintu A.4.6.2.5 12.00 Set 35,702.70
Handle A.4.6.2.11.a 4.00 Set 120,928.50
lockcase A.4.6.2.1.a 4.00 Set 241,785.50
Stoper A.4.6.2.13 4.00 Set 292,033.50
20 cm 1.00 Unit
A.4.2.1.11 5.10 m' 109,840.50
Pintu A.4.6.1.8.a 1.31 m2 882,231.58
l Pintu A.4.6.2.5 3.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
2 3 4 5 6
60 cm 8.00 Unit
A.4.2.1.11 150.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 14.03 m2 566,362.50
5 mm A.4.6.2.17 28.44 m2 220,227.70
ment Handle A.4.6.2.11.b 16.00 Set 49,868.50
n Stay A.4.6.2.9 32.00 Set 33,863.50
0 cm 1.00 Unit
A.4.2.1.11 18.40 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 0.77 m2 566,362.50
5 mm A.4.6.2.17 4.14 m2 220,227.70
ment Handle A.4.6.2.11.b 1.00 Set 49,868.50
n Stay A.4.6.2.9 2.00 Set 33,863.50
0 cm 5.00 Unit
A.4.2.1.11 67.80 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 4.13 m2 566,362.50
5 mm A.4.6.2.17 13.63 m2 220,227.70
ment Handle A.4.6.2.11.b 5.00 Set 49,868.50
n Stay A.4.6.2.9 10.00 Set 33,863.50
60 cm 4.00 Unit
A.4.2.1.11 40.08 m' 109,840.50
Jendela kaca 5 mm A.4.2.1.13.b 40.08 m2 566,362.50
5 mm A.4.6.2.17 3.30 m2 220,227.70
ment Handle A.4.6.2.11.b 4.00 Set 49,868.50
n Stay A.4.6.2.9 4.00 Set 33,863.50
0 cm 2.00 Unit
A.4.2.1.11 138.48 m' 109,840.50
8 mm A.4.6.2.18 55.96 m2 512,270.55
5 cm 1.00 Unit
A.4.2.1.11 32.50 m' 109,840.50
5 mm A.4.6.2.17 10.30 m2 220,227.70
cm 4.00 Unit
A.4.2.1.11 9.92 m' 109,840.50
5 mm A.4.6.2.17 1.58 m2 220,227.70
2 3 4 5 6
4 cm 18.00 Unit
A.4.2.1.11 79.56 m' 109,840.50
5 mm A.4.6.2.17 14.47 m2 220,227.70
40 cm 3.00 Unit
A.4.2.1.11 28.44 m' 109,840.50
8 mm A.4.6.2.18 8.89 m2 512,270.55
20 cm 1.00 Unit
A.4.2.1.11 5.37 m' 109,840.50
Pintu A.4.6.1.8.a 2.14 m2 882,231.58
l Pintu A.4.6.2.5 4.00 Set 35,702.70
Handle A.4.6.2.11.a 1.00 Set 120,928.50
lockcase A.4.6.2.1.a 1.00 Set 241,785.50
Stoper A.4.6.2.13 1.00 Set 292,033.50
Closer A.4.6.2.10 1.00 Set 247,384.50
Sub Jumlah IV 1
AAN SANITAIR
2 3 4 5 6
afel wall hung tipe 2 A.5.1.1.5.a 9.00 set 1,032,416.00
1 Lubang dengan Petirasan A.5.1.1.12 1.00 set 1,117,110.50
Pantry A.5.1.1.19 1.00 set 95,834.75
bar U&B 3.00 set 468,600.00
bar Difable U&B 3.00 set 3,190,000.00
l Hoek A.5.1.1.1.a 1.00 set 4,973,595.00
Cermin 5 mm ex. Lokal A.4.6.2.20 8.19 m2 531,393.50
Beton Tebal 10 Cm untuk Pantry/Lab./Wastafel A.4.1.1.35 0.11 m3 7,361,243.29
p
g Luar (weathershield) A.4.7.1.10.b 44.22 m2 29,332.05
g Dalam (easy clean) A.4.7.1.10.a 42.20 m2 31,048.05
2 3 4 5 6
Sub Jumlah VI
AAN LAIN-LAIN
Tangga :
ndrail dan Railling tangga 1 A.4.2.1.20.a 25.37 m2 457,842.00
ndrail dan Railling tangga 2 A.4.2.1.20.a 22.39 m2 457,842.00
elekat Meja Konter Bahan Multipleks Fin. HPL 5.66 m' 1,500,000.00
Tangga :
ndrail dan Railling ( Void ) A.4.2.1.20.a 23.77 m2 457,842.00
Sub Jumlah VII
TUR FASADE BANGUNAN
Flat Tebal 0.3 mm + Pemasangan U&B 124.68 m2 935,000.00
i Aluminium U&B 79.04 m2 1,036,200.00
age :
ALASI RADIOLOGI 1,033.20 cm 17,400.00
ALASI LABORATORIUM 1,205.40 cm 17,400.00
Sub Jumlah VIII
JUMLAH TOTAL PEKERJAAN ARSITEKTUR 4
2 3 4 5 6
AAN MEKANIKAL ELEKTRIKAL
Penerangan dan Kotak Kontak Lantai 1 & 2
2 3 4 5 6
RIBUSI PANEL IPRS (Wall mounted) (DIGEDUNG PANEL LV-MDP EKSISTING 1.00 Lot BY OTHER
RIBUSI PANEL RAD & LAB (Wall mounted) Lengkap dengan : set
Ukuran 1200 x 80 x 25 cm 1.00 bh 7,197,700.00
0A - 500A, 36kA, 3P 1.00 bh 6,516,800.00
0A, 18kA, 3P 1.00 bh 1,540,000.00
A, 10kA, 3P 1.00 bh 700,500.00
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 7,5kA, 3P 2.00 bh 653,800.00
3P, 10 kA 1.00 bh 553,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 2,000,000.00
ster tipe 1 3P+N 1.00 bh 4,000,000.00
el + Material bantu 1.00 lot 3,000,000.00
2 3 4 5 6
RIBUSI PANEL CT SCAN & MRI(Wall mounted) Lengkap dengan : 1.00 set
Ukuran 60 x 80 x 20 cm 1.00 bh 3,531,500.00
0A, 36kA, 3P 1.00 bh 3,080,000.00
0A, 18kA, 3P 2.00 bh 1,540,000.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,500,000.00
ster tipe 1 3P+N 1.00 bh 4,000,000.00
el + Material bantu 1.00 lot 2,000,000.00
2 3 4 5 6
A, 7,5kA, 3P 1.00 bh 653,800.00
A, 6kA, 3P 1.00 bh 553,500.00
4,5kA, 1P 1.00 bh 85,500.00
4,5kA, 1P 4.00 bh 85,500.00
4,5kA, 1P 12.00 bh 85,500.00
4,5kA, 1P 9.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
el + Material bantu 1.00 lot 1,000,000.00
2 3 4 5 6
PANEL AC 2 (Wall mounted)
Ukuran 50 x 70 x 20 cm 1.00 bh 3,116,000.00
A, 10kA, 3P 1.00 bh 700,500.00
6kA, 3P 2.00 bh 553,500.00
A, 4,5kA, 1P 8.00 bh 85,500.00
4,5kA, 1P 7.00 bh 85,500.00
4,5kA, 1P 8.00 bh 85,500.00
ter, 3CT + selector switch 1.00 bh 1,000,000.00
+ selector switch 1.00 bh 750,000.00
Holder 3.00 bh 60,000.00
nda 3.00 bh 30,000.00
1.00 lot 1,000,000.00
el + Material bantu 1.00 lot 1,000,000.00
der
Y 4 (4 x 150 mm²) (LV-MDP Gedung Eksisting - SDP IPRS ) BY OTHER
FGBY 4 x 185 mm² (SDP IPRS - SDP. CT scan & Mri ) 154.00 m' 1,736,250.00
FGBY 2(4x120) mm² (SDP IPRS - SDP.Rad & lab) 142.00 m' 2,184,000.00
Y 4 x 95 mm² ( SDP. CT scan & Mri - UPS CT SCAN - MESIN CT SCAN) m' BY OTHER
Y 4 x 95 mm² ( SDP. CT scan & Mri - UPS MRI - MESIN MRI) m' BY OTHER
Y 4 x 95 mm² ( SDP.Rad & lab - PP.X-RAY ) 55.00 m' 907,400.00
Y 4 x 50 mm² ( PP.X-RAY - MESIN FLOUROSCOPY ) m' BY OTHER
Y 4 x 35 mm² ( PP.X-RAY - MESIN X-RAY ) m' BY OTHER
Y 4 x 50 mm² ( SDP.Rad & lab - UPS 80KVA- PP.UPS LAB) 74.00 m' 464,750.00
Y 4x10 mm² (SDP.Rad & lab - PP LANTAI 1) 54.00 m' 84,058.00
2 3 4 5 6
Y 4x10 mm² (SDP.Rad & lab - PP LANTAI 2) 20.00 m' 84,058.00
Y 4x10 mm² (SDP.Rad & lab - PP AC 1) 54.00 m' 84,058.00
Y 4x16 mm² (SDP.Rad & lab - PP AC 2) 20.00 m' 166,400.00
Y 4x2,5 mm² (PP LANTAI 1 - DUMB WAITER 1 42.00 m' 25,480.00
Y 4x4 mm² (PP lantai 1 - Pompa Transfer AB) 38.00 m' 42,900.00
Y 3x4 mm² (PP LANTAI 2 - POMPA BOOSTER) 102.00 m' 28,860.00
Y 4x4 mm² (PP Lantai 1 - Mamografi) 33.00 m' 42,900.00
Y 3x4 mm² (PP Lantai 1 - Panaromig) 43.00 m' 28,860.00
Y 3x4 mm² (PP LANTAI 2 - P. RO) 72.00 m' 28,860.00
Y 4x4 mm² (PP- AC Lantai 2 - AC LAB 1) 105.00 m' 42,900.00
Y 4x4 mm² (PP- AC Lantai 2 - AC LAB 2) 106.00 m' 42,900.00
g Arus kuat
BC mm² (GROUNDING PENTANAHAN - SDP. CT scan & Mri) 25.00 m' 195,000.00
150 mm² (GROUNDING PENTANAHAN 2 - SDP.Rad & lab) 35.00 m' 214,500.00
50 mm² (GROUNDING PENTANAHAN 3 - PP X-RAY) 25.00 m' 78,000.00
35 mm² (SDP.Rad & lab - UPS 80 KVA - PP.UPS LAB) 74.00 m' 59,800.00
6 mm² (SDP.Rad & lab - PP Lantai 1) 20.00 m' 11,700.00
6 mm² (SDP.Rad & lab - PP Lantai 2) 54.00 m' 11,700.00
6 mm² (SDP.Rad & lab - PP AC 1) 20.00 m' 11,700.00
10 mm² (SDP.Rad & lab - PP AC 2) 54.00 m' 22,100.00
6 mm² (PP lantai 1 - Pompa Transfer AB) 102.00 m' 11,700.00
4 mm² (PP Lantai 1 - DUMB WAITER 1 42.00 m' 10,400.00
4 mm² (PP Lantai 1 - Mamografi) 33.00 m' 10,400.00
4 mm² (PP- AC Lantai 2 - AC LAB 1) 105.00 m' 10,400.00
4 mm² (PP- AC Lantai 2 - AC LAB 2) 106.00 m' 10,400.00
2 3 4 5 6
2 3 4 5 6
oning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 4.00 unit 4,940,000.00
oning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 4.00 unit 5,120,000.00
oning split Kap. 12.500 BTUH / 1 1/2 pk tipe wall mounted 1.00 unit 6,370,000.00
oning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 4.00 unit 8,580,000.00
oning split Kap. 18000 BTUH / 2 pk tipe Ceiling Casette 1.00 unit BY OTHER
p kontak AC 1 phase 25.00 bh 172,000.00
gerant 1/4″ + 3/8″ + Isolasi 190.00 m' 63,920.80
gerant 1/4″ + 1/2″ + Isolasi 60.00 m' 77,145.80
PVC AW 1 1/4" + Isolasi 64.00 m' 51,206.00
PVC AW 1'' + Isolasi 40.00 m' 42,000.00
PVC AW 3/4'' + Isolasi 125.00 m' 38,000.00
c lantai 2
ower AC 1 Fasa (NYM 3x2.5 mm²) 21.00 titik 431,816.00
oning split Kap. 5500 BTUH / 1/2 pk tipe wall mounted 7.00 unit 4,940,000.00
oning split Kap. 7500 BTUH / 3/4 pk tipe wall mounted 1.00 unit 4,940,000.00
oning split Kap. 9.000 BTUH / 1 pk tipe wall mounted 4.00 unit 5,120,000.00
oning split Kap. 12.500 BTUH / 1 1/2 pk tipe wall mounted 5.00 unit 6,370,000.00
oning split Kap. 18.000 BTUH / 2 pk tipe wall mounted 2.00 unit 8,580,000.00
p kontak AC 1 phase 21.00 bh 172,000.00
gerant 1/4″ + 3/8″ + Isolasi 120.00 m' 63,920.80
gerant 1/4″ + 1/2″ + Isolasi 70.00 m' 77,145.80
PVC AW 1 1/4" + Isolasi 59.00 m' 69,453.00
PVC AW 1'' + Isolasi 72.00 m' 38,862.35
PVC AW 3/4'' + Isolasi 95.00 m' 37,596.30
2 3 4 5 6
oning split Duct. 60.000 BTUH lengkap 2.00 lot 102,503,000.00
ducting Ruang Lab
duct bahan Polyurethane c/w supporting
25 x 30 cm
25x 60 cm
25 x 80 cm
duct bahan Polyurethane c/w supporting
25 x 30 cm
25x 60 cm
25 x 80 cm
box
AG 500 cfm( 4 buah)
35 500 cfm(4 buah)
amper
ai 1 & 2
ower FAN 1 Fasa (NYM 3x2.5 mm²) 20.00 titik 260,658.00
kelas D dia. 100 mm atau 4" 66.00 m' 117,300.00
m flexible ducting 4 inch 22.00 m' 31,850.00
aust fan Toilet ukuran 20 x 20 cm 6.00 bh 300,000.00
hausth Fan tipe sirocco 50 cfm 11.00 unit 912,680.00
Wall Exchaust FAN 10" kap. 300 CFM 0.4 in wg low noise c/w asesories 9.00 unit 896,000.00
Sub Jumlah Instalasi Pengkondisian Udara / AC
Telephone Lantai 1 & 2
abel ITC 2x0.6mm² dalam High Impact conduit dia. 20 mm
elephone 17.00 titk 420,600.00
Telephone single line 17.00 bh BY OTHER
ephone dinding 1 Pole 17.00 bh 85,000.00
Utama
a PABX kap. 8 co line 32Extention lengkap dengan : 1.00 set BY RUANG OK
t PABX, Power suplai, memory card, Extension card, analog card
ngan & Pemrograman
c/w frame & LSA40 Ext. 1.00 set 4,900,000.00
20x2x0.6mm² (MDF - PABX) 75.00 m' 208,750.00
Sub Jumlah Instalasi Telephone
Fire Alarm Lantai 1 & 2
A 2x1x1.5 mm² dalam High Impact conduit dia. 20 mm
eat Detector type Rate Of Rise (ROR) 69.00 titik 219,500.00
ctor ROR 48.00 bh 192,025.00
tector 21.00 bh 640,640.00
e 6.00 unit 15,000.00
Utama
2 3 4 5 6
rol Fire Alarm (MCFA) tipe konvensional 10 Zone lengkap dengan peralatan 1.00 unit 14,375,000.00
man MCFA 1.00 unit 4,000,000.00
VA 1.00 ls 5,932,000.00
Sub Jumlah Instalasi Fire Alarm
Kabel Data Komputer Lantai 1 & 2
ot
P Cat 6 dalam High Impact conduit dia. 20 mm
abel Data Wifi 4.00 titik 435,000.00
s Point 802,11n - 2,4GHz/5GHz R11 Meter 4.00 bh 1,665,000.00
otak Kontak untuk Wifi (NYM 3x2,5mm2) 4.00 titik 290,908.00
tak Outbow 4.00 bh 49,600.00
Switch Hub untuk UTP cat 6. kap 8 Port 2.00 bh 3,600,000.00
ower Switch Hub & Kotak Kontak. 2.00 bh 290,908.00
witch/ Hub ke Hub Consentrator Ke eksisting 1.00 titik BY OTHER
Sub Jumlah Instalasi Kabel Data Komputer
CCTV Lantai 1 & 2
AXIAL. RG 59 18AWG BC 95% dengan kabel power dalam High Impact conduit dia. 20 mm
amera CCTV 7.00 titik 460,000.00
lution Dome Camera high resolution lengkap dengan Power adaptor & asesori 7.00 bh 522,600.00
lution In door Box CCD Camera day and night lengkap dengan Power adaptor 1.00 bh 1,355,000.00
utama / Sentral CCTV
CTV lengkap dengan peralatan, pemasangan, pengkabelan & asesories
Kap. 8 Channel C/W Hard Disks 2 terrabyte 1.00 unit 6,492,200.00
r 32 inch 1.00 unit 4,000,000.00
VA 1.00 ls 8,690,000.00
V 1.00 ls 2,000,000.00
Sub Jumlah Instalasi CCTV
2 3 4 5 6
s, Kotor dan Vent Lantai 1 & 2
AW lengkap dengan fitting, bobokan & Penggantung
2
kelas AW dia. 150 mm atau 6" 51.00 m' 260,524.00
kelas AW dia. 100 mm atau 4" 330.00 m' 135,437.50
kelas AW dia. 80 mm atau 3" 72.00 m' 89,190.75
kelas AW dia. 50 mm atau 2" 48.00 m' 56,562.00
kelas AW dia.32 mm atau 1 1/4" 66.00 m' 41,206.00
Grease trap pelat stainless ukuran (Pxlxt) 50x30x45 cm 1.00 unit 2,812,500.00
mpung infeksius kap. 3 m3 1.00 unit 12,000,000.00
elup Sewage Kapasitas 100 L/m lengkap dengan instalasi power + aksesoris p 2.00 unit 4,600,800.00
Bio Limbah rumah sakit Kapasitas 2.000 Liter Lengkap dengan 2.00 unit 19,825,000.00
eling pengikat
ngurai dan tablet disinfeksikan
eptictank Bio (dinding Bata) + Tutup Plat besi 1,2 mm unit
ak 30X30 Clean out 4 inci(area lantai 1) 9.00 Lot 750,000.00
nhole dak bak bata/plesteran
4 inci
ci
4 inci (area lantai 2) 6.00 bh 138,281.25
upporting(Gantungan Pipa Besi Siku 50mm, Dynabolt, Mur & baut ) 1.00 lot 8,464,990.50
2 3 4 5 6
PN 10 dia. 20 atau 1/2" 220.00 m' 38,984.00
e dia. 50 atau 1 1/2 " 2.00 bh 420,000.00
e dia. 40 atau 1 1/4 " 3.00 bh 384,000.00
upporting(Gantungan Pipa Besi Siku 50mm, Dynabolt, Mur & baut ) 1.00 lot 9,063,036.20
RANSFER AIR BERSIH
mpa Transfer air bersih kap. 8m3/jam Total head 40 meter 4 kw (1 Pompa) (len 1.00 set 33,500,000.00
e 1 1/2''
ve 1 1/2''
e 1 1/2''
Gauge
trol pompa air bersih transfer
/Struktur reservoir Ground Water Tank (GWT) kap. 2x40 m3 & rumah pompa 1.00 ls 282,175,000.00
2 3 4 5 6
IH di AtapSystem Lengkap dengan
Osmosis
mmercial Reverse Osmosis 1.00 set 63,480,000.00
Steel Membrane vessel 4040 Seamless
e Reverse Osmosis 2000gpd
ump Shimizhu 135
steel Frame Hollow 40x40 1,2mm
ultistage Centrifugal
r 5gpm
e 3/4 Bronze
Gauge 5bar
Gauge 15bar
bronze inline 3/4"
auto flushing
20" 1 mikron blue
sure Swicth
C rucika AW before housing membrane
pressure system
ment
e FRP 1054 polypropelene
engan
e FRP 1354 polypropelene Softener
a Filter, P. Silica
ome ( Srilangka )
tener Lewatit
Cartrige 20"
20" 5 mikron blue
20" 1 mikron blue
Pump Maxon multistage
alasi
lum proses
Instalasi filterisasi, pembuangan & limbah
1phase
x40
p
ntroller
Unitec 12gpm w/t alarm
2 3 4 5 6
n place Lengkap dengan 1.00 set 3,714,500.00
Cleaning RO123
valve for cleaning
n Valve Pvc 3/4
2 3 4 5 6
ulangan Kebakaran
guisher kap. 3 Kg Klass ABC tipe CO2 6.00 unit 1,864,000.00
Sub Jumlah Instalasi Penanggulangan Kebakaran
air hujan
kelas AW dia. 150 mm atau 6" 115.00 m' 260,524.00
kelas AW dia. 100 mm atau 4" 105.00 m' 135,437.50
n dia. 100 mm atau 4" 7.00 bh 497,950.00
upporting 1.00 lot 3,541,317.50
ainase tipe terbuka lengkap dengan : m' By Sipil
ol 50X50 bh By Sipil
Sub Jumlah Instalasi Saluran Air Hujan
ter
er Kapasitas 100 Kg 2 lantai Termasuk Biaya ongkos kirim & jasa 1.00 unit 132,300,000.00
ox 700(w) x 700(D) x 800(H)
sipil Untuk Dumb waiter (beam,wp,baja & asseories) 1.00 lot 30,000,000.00
Sub Jumlah Instalasi Dumbwaiter
JUMLAH TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL 2
A. PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank
44.400 mx 2.000 ss= 88.800 m
19.600 mx 2.000 ss= 39.200 m
128.000 m
2 Pembongkaran
171.400 m
32.000 3,582.000 m
32.000 199.000 bh
32.000 104.788
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
5 Urugan Pasir t = 10 cm P1 - x 0.600 mx 0.600 mx 0.1 m= -
P2 4.000 x 0.800 mx 1.550 mx 0.1 m= 0.496
P3 2.000 x 2.240 m2x 0.100 m= 0.448
P4 10.000 x 1.550 mx 1.550 mx 0.1 m= 2.403
P6 2.000 x 2.300 mx 1.550 mx 0.1 m= 0.713
P7 4.000 x 2.300 mx 2.300 mx 0.1 m= 2.116
P9 5.000 x 2.300 mx 2.300 mx 0.1 m= 2.645
P12 5.000 x 3.050 mx 2.300 mx 0.1 m= 3.508
32.000 12.328
32.000 6.164
7 Poer Type P2
beton 4.000 unitx 0.800 mx 1.550 mx 0.700 m= 3.472
13.160
7 Poer Type P4
beton 10.000 unitx 1.550 mx 1.550 mx 0.700 m= 16.818
43.400
7 Poer Type P6
beton 2.000 unitx 2.300 mx 1.550 mx 0.700 m= 4.991
10.780
7 Poer Type P7
beton 4.000 unitx 2.300 mx 2.300 mx 0.700 m= 14.812
25.760
7 Poer Type P9
beton 5.000 unitx 2.300 mx 2.300 mx 0.700 m= 18.515
32.200
37.450
1 Kolom Pondasi K1 Uk. 45x45 cm beton 0.450 x 0.450 x 0.700 mx 30.000 unit= 4.253
C. PEKERJAAN STRUKTUR
1 Sloof Uk. 35x60 cm
- Beton Ready Mix K-225
- 44.450 mx 4.000 bh= 177.800 m
I 19.450 mx 7.000 bh= 136.150 m
396.833 m2
192.098 m2
3.600
27.392 m2
12.100 m- - = 12.100
9.075 m2
1 Kolom K1 Uk. 45x45 cm Lt.1 beton 0.450 x 0.450 x 3.400 mx 30.000 unit= 20.655
- Plesteran Kolom Uk. 45x45 Lt.1 2 ss 0.450 mx 3.400 mx 4.000 ss= 6.120 m2- 3.060
1 ss 0.450 mx 3.400 mx 4.000 ss= 6.120 m2- 4.590
- Plesteran Kolom Uk. 30x30 Lt.1 4 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- -
3 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 1.080
2 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 2.160
1 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 3.240
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
- Plesteran Kolom Uk. 20x20 Lt.1 1 ss 0.200 mx 3.600 mx 4.000 ss= 2.880 m2- 2.160
Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.360
- Beton Ready Mix K-225
- 28.450 mx 1.000 bh= 28.450 m
44.450 mx 1.000 bh= 44.450 m
4.075 mx 2.000 bh= 8.150 m
I 13.275 mx 1.000 bh= 13.275 m
5.450 mx 1.000 bh= 5.450 m
2.275 mx 3.000 bh= 6.825 m
8.450 mx 1.000 bh= 8.450 m
9.000
79.538 m2
146.978 m2
- Plesteran Plat Dack Uk.15/40 elv. 3.360 115.050 m2x 2.000 ss= 230.100 m2
106.425 mx 0.300 m= 31.928 m2
262.028 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
394.065 m2
183.698 m2
33.724 m2
12.000 m- - = 12.000
9.000 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
2 Kolom K1 Uk. 45x45 cm Lt.2 beton 0.450 x 0.450 x 3.450 mx 30.000 unit= 20.959
- Plesteran Kolom Uk. 45x45 Lt.2 2 ss 0.450 mx 3.450 mx 4.000 ss= 6.210 m2- 3.105
1 ss 0.450 mx 3.450 mx 4.000 ss= 6.210 m2- 4.658
4 ss 0.450 mx 3.450 mx 4.000 ss= 6.210 m2- -
- Plesteran Kolom Uk. 30x30 Lt.2 4 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- -
3 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 1.080
2 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 2.160
1 ss 0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 3.240
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
elv.4.500
1 Balok Uk. 15x40 cm elv.4.5
- Beton Ready Mix K-225
40.450 mx 2.000 bh= 80.900 m
elv.4.800 5.400
56.625 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
57.348 m2
- Plesteran List Plat Dack elv. 4.8 64.800 mx 0.585 mx 2.000 ss= 75.816 m2
21.220 mx 0.300 mx 4.000 bh= 25.464 m2
101.280 m2
elv.7.20
PERHITUNGAN VOLUME
PERHITUNGAN VOLUME
128.000 m
171.400 m
32.000 3,582.000 m
unit ttk bh
- x 1.000 x 1.000 = - bh
4.000 x 2.000 x 1.000 = 8.000 bh
2.000 x 3.000 x 1.000 = 6.000 bh
10.000 x 4.000 x 1.000 = 40.000 bh
2.000 x 6.000 x 1.000 = 12.000 bh
4.000 x 7.000 x 1.000 = 28.000 bh
5.000 x 9.000 x 1.000 = 45.000 bh
5.000 x 12.000 x 1.000 = 60.000 bh
32.000 199.000 bh
32.000 104.788 m3
PERHITUNGAN VOLUME
PERHITUNGAN VOLUME
- x 0.600 mx 0.600 mx 0.1 m= - m3
4.000 x 0.800 mx 1.550 mx 0.1 m= 0.496 m3
2.000 x 2.240 m2x 0.100 m= 0.448 m3
10.000 x 1.550 mx 1.550 mx 0.1 m= 2.403 m3
2.000 x 2.300 mx 1.550 mx 0.1 m= 0.713 m3
4.000 x 2.300 mx 2.300 mx 0.1 m= 2.116 m3
5.000 x 2.300 mx 2.300 mx 0.1 m= 2.645 m3
5.000 x 3.050 mx 2.300 mx 0.1 m= 3.508 m3
32.000 12.328 m3
32.000 6.164 m3
13.160 m2
43.400 m2
10.780 m2
25.760 m2
32.200 m2
37.450 m2
396.833 m2
192.098 m2
PERHITUNGAN VOLUME
3.600
27.392 m2
9.075 m2
0.450 mx 3.400 mx 4.000 ss= 6.120 m2- 3.060 = 3.060 m2x 20.000 bh= 61.200
0.450 mx 3.400 mx 4.000 ss= 6.120 m2- 4.590 = 1.530 m2x 10.000 bh= 15.300
76.500
0.300 mx 3.600 mx 4.000 ss= 4.320 m2- - = 4.320 m2x 2.000 bh= 8.640
0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 1.080 = 3.240 m2x bh=
0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 2.160 = 2.160 m2x bh=
0.300 mx 3.600 mx 4.000 ss= 4.320 m2- 3.240 = 1.080 m2x bh=
PERHITUNGAN VOLUME
8.640
0.200 mx 3.600 mx 4.000 ss= 2.880 m2- 2.160 = 0.720 m2x 1.000 bh= 0.720
9.000
79.538 m2
146.978 m2
262.028 m2
PERHITUNGAN VOLUME
394.065 m2
183.698 m2
33.724 m2
4.400 m
4.350 m
9.000 m2
PERHITUNGAN VOLUME
0.450 mx 3.450 mx 4.000 ss= 6.210 m2- 3.105 = 3.105 m2x 9.000 bh= 27.945
0.450 mx 3.450 mx 4.000 ss= 6.210 m2- 4.658 = 1.553 m2x 20.000 bh= 31.050
0.450 mx 3.450 mx 4.000 ss= 6.210 m2- - = 6.210 m2x 1.000 bh= 6.210
65.205
4.320
PERHITUNGAN VOLUME
5.400
56.625 m2
PERHITUNGAN VOLUME
57.348 m2
101.280 m2
ANALISA HARGA SATUAN PEKERJAAN
UNIT KERJA : DINAS PEKERJAAN UMUM KALIMANTAN BARAT
PEKERJAAN : PEMBANGUNAN MENARA MERCUSUAR
LOKASI : D.I WAY PALAKIA - KEC. SUKAU, KAB. LAMPUNG BARAT
PEMERINTAH : KALIMANTAN BARAT TAHUN ANGGARAN 2019
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.1.1.7.a Membuat 1 m³ beton mutu f'c =19,3 Mpa ( K 225), slump (12 ± 2) cm ,w/c = 0,58 (Menggunakan Molen)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
20 November 2019
CV. DUTA KHATULISTIWA
10,600.00
12,500.00
1,350.00
575.00
25,025.00
21,600.00
310.00
12,600.00
34,510.00
59,535.00
5,953.50
65,488.50
Jumlah Harga
(Rp)
79,500.00
2,875.00
82,375.00
82,375.00
8,237.50
90,612.50
= 0,58 (Menggunakan Molen)
140,238.00
23,625.00
2,565.00
7,590.00
174,018.00
504,560.00
39,885.71
387,777.78
-
932,223.49
25,000.00
25,000.00
1,131,241.49
113,124.15
1,244,365.64
7,420.00
8,750.00
945.00
460.00
17,575.00
131,250.00
1,950.00
133,200.00
150,775.00
15,077.50
165,852.50
16,585.25
20 November 2019
CV. DUTA KHATULISTIWA
1 2 3
A. BAHAN PENGISI
Pasir Beton M³
Batu Pecah 2-3 cm M³
Batu Pecah 1-2 cm M³
Semen (1 Zak @ 50 kg) Kg
Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25 K 450 -6 m Btg
Beton Ready Mix K 300 M³
Beton Ready Mix K 225 M³
Beton Ready Mix K 250 M³
Sewa Molen sewa-hr
Pompa Ready Mix /perhari
B. BAHAN KAYU
Balok Kayu Klas II Tidak Ketam M³
Papan Kayu Klas II Ketam M³
Papan Kayu Klas II Tidak Ketam M³
Papan Kayu Camp. ( Klas III ) M³
Kayu Bulat Ø 8 - 12 Cm / 4 M' Btg
Kayu Bulat Ø 6 - 8 Cm / 4 M' Btg
Woodplank M
1 2 3
Cat Dasar Kg
Pelamur Air Kg
Cat Waterproofing Kg
F. BAHAN PENUTUP LANTAI
Bataco 7x15x30 Keping
Keramik Anti Gores 60x60 Polished M2 (Ktk)
Keramik Anti Gores 60x60 Unpolished M2 (Ktk)
Keramik 30x30 Polished M2 (Ktk)
Keramik 30x30 Unpolished M2 (Ktk)
Keramik 20x40 M2 (Ktk)
Oker / Semen Warna Kg
Lantai Vynil M2
Plint keramik 10 x 40 cm kotak
NO. NAMA BARANG Satuan
1 2 3
D BAHAN PENGGANTUNG
Paku Besi uk. 2" - 4 " Kg
Kait Angin Jendela Bh
Gagang Pintu Bh
Kunci Tanam Biasa Bh
Kunci Tanam Besar Bh
Engsel Jendela Psg
Engsel Pintu Psg
Grendel 3" Bh
Handle Jendela Bh
E BAHAN LAIN - LAIN
Kloset duduk putih Bh
Wastafel Bh
Wastafel Cuci Bayi Bh
Wall Shower/ Fix Shower Bh
Hand Shower Unit
Kran Air Uk. 3/4" Bh
Jet Washer Unit
Floordrain Bh
Kitchenzink stainless steel 1 lubang Unit
Slop Sink/ Spoel Hoek Unit
Grab Bar Stainless Unit
Grab Bar Difable Unit
Multiplek 5 mm Lbr
Papan Gypsum ( 122 x 244 ) cm Lbr
Panel GRC 120 x 240 x 40 Lbr
Kaca 5 mm ( Polos ) M²
Kaca Polos, t = 8 mm M²
Kaca Cermin t = 5 mm M²
Pintu Tempered Polos 12 mm - Uk. 87 x 213,5 cm Unit
Pintu Tempered Polos 12 mm M2
Besi Beton ulir Kg
Besi Beton polos Kg
Kawat Bendrat Kg
Wiremesh Kg
Rangka Plafond Metal Furing + Pemasangan M2
Paku Sekrup Gibsum Kg
Jalusi Aluminium M2
Partisi Cubical Unit
Kusen Aluminium 3" Silver M'
Profil Pintu Aluminium M'
Rangka Metal hollow 40.40.2 mm M'
Pipa stainless steel M'
NO. NAMA BARANG Satuan
1 2 3
Sealtape Bh
ACP Flat Tebal 0.3 mm + Pemasangan M2
Skrup Fixer Bh
Sealant Kg
Lem Kayu Kg
Plywood 4 mm Lbr
HPL 1,22 m x 2,44 m x 0,7 mm Lbr
Door Stoper Bh
Door Closer Bh
Roda Gantung Bh
A DASAR SATUAN UPAH AN BAHAN
TAHUN ANGGARAN 2019
UPAH TENAGA
KERJA
( Rp/Hari )
106,000.00
125,000.00
135,000.00
115,000.00
Harga
Dasar
( Rp. )
4
Poli
80,000.00
470,000.00
500,000.00
1,360.00
1,600,000.00
1,350,000.00
1,200,000.00
1,250,000.00
100,000.00
4,000,000.00
1,900,000.00
3,250,000.00
2,850,000.00
1,800,000.00
12,000.00
8,000.00
50,000.00
46,000.00
90,000.00
150,000.00
88,000.00
29,480.00
56,000.00
50,000.00
Harga
Dasar
( Rp. )
4
12,750.00
12,000.00
45,000.00
1,300.00
200,000.00
198,000.00
98,000.00
96,000.00
110,000.00
14,000.00
550,000.00
97,500.00
Harga
Dasar
( Rp. )
4
15,500.00
7,500.00
80,000.00
130,000.00
150,000.00
8,000.00
10,000.00
9,000.00
15,400.00
2,000,000.00
550,000.00
550,000.00
170,000.00
500,000.00
30,000.00
245,000.00
15,000.00
650,000.00
4,000,000.00
426,000.00
2,900,000.00
95,000.00
71,000.00
70,000.00
160,000.00
398,000.00
418,000.00
4,840,000.00
2,650,000.00
14,000.00
12,500.00
13,000.00
11,500.00
120,000.00
53,000.00
942,000.00
3,000,000.00
78,000.00
70,000.00
26,000.00
121,275.00
Harga
Dasar
( Rp. )
4
3,500.00
850,000.00
600.00
35,000.00
18,500.00
55,000.00
450,000.00
250,000.00
150,000.00
130,000.00
2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN
2.2.1.2.a Pembuatan 1 m² pagar sementara dari seng gelombang tinggi 2 meter tanpa beton
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
E Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
21,200.00
50,000.00
2,700.00
2,300.00
76,200.00
15,000.00
55,200.00
129,600.00
930.00
200,730.00
276,930.00
27,693.00
304,623.00
10,600.00
12,500.00
1,350.00
575.00
25,025.00
21,600.00
310.00
12,600.00
34,510.00
59,535.00
5,953.50
65,488.50
Jumlah Harga (Rp)
10,600.00
5,750.00
16,350.00
16,350.00
1,635.00
17,985.00
2.3.1. HARGA SATUAN PEKERJAAN TANAH
2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1m
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.750 106,000.00
2 Mandor L.04 OH 0.025 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 106,000.00
2 Mandor L.04 OH 0.010 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug 1.200 80,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
79,500.00
2,875.00
82,375.00
82,375.00
8,237.50
90,612.50
31,800.00
1,150.00
32,950.00
96,000.00
96,000.00
128,950.00
12,895.00
141,845.00
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
KEGIATAN :
PEKERJAAN : PEMBANGUNAN GEDUNG RUANG OPERASI (OK)
SUB PEKERJAAN : PEMBANGUNAN RUANG OPERASI (OK)
LOKASI :
TAHUN ANGGARAN :
1 2 3 4
A. PEKERJAAN PENDAHULUAN
1 Pemasangan Bowplank 128.000 11.111 1,478.722 M'
2 Pembongkaran 1.000 1.000 Lsm
3 Pagar Sementara 171.400 11.111 1,980.101 M'
PEKERJAAN PENDAHULUAN
B. PEKERJAAN PONDASI
1 Pengadaan Tiang Pancang (Mini Pile / Ready 597.000 1,111.111 6,897.000 Btg
Mix) uk. Π 25 x 25, 8 D 13, ø 6 K 350 -6 m
2 Pemancangan Mini Pile 25 x 25 K350 3,582.000 11,111.111 41,381.000 M'
3 Pembobokan Mini Pile 199.000 1,111.111 2,299.000 Titik
4 Galian Tanah Pondasi 104.788 11.111 1,210.565 M³
5 Urugan Pasir t = 10 cm 12.328 11.111 142.419 M³
6 Lantai Kerja t = 5 cm 6.164 11.111 71.210 M³
7 Poer Type P1 11.111 -
- Beton Ready Mix K-300 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Bekisting Pondasi - 11.111 - M²
8 Poer Type P2 11.111 -
- Beton Ready Mix K-300 3.472 11.111 40.110 M³
- Tulangan U32 296.345 11.111 3,423.528 Kg
- Bekisting Pondasi 13.160 11.111 152.031 M²
9 Poer Type P3 11.111 -
- Beton Ready Mix K-300 3.136 11.111 36.229 M³
- Tulangan U32 211.651 11.111 2,445.102 Kg
- Bekisting Pondasi 7.980 11.111 92.189 M²
10 Poer Type P4 11.111 -
- Beton Ready Mix K-300 16.818 11.111 194.284 M³
- Tulangan U32 1,574.462 11.111 18,188.998 Kg
- Bekisting Pondasi 43.400 11.111 501.379 M²
11 Poer Type P6 11.111 -
- Beton Ready Mix K-300 4.991 11.111 57.659 M³
- Tulangan U32 326.042 11.111 3,766.603 Kg
- Bekisting Pondasi 10.780 11.111 124.536 M²
12 Poer Type P7 11.111 -
NO URAIAN PEKERJAAN VOLUME SAT
1 2 3 4
- Beton Ready Mix K-300 14.812 11.111 171.116 M³
- Tulangan U32 892.786 11.111 10,313.920 Kg
- Bekisting Pondasi 25.760 11.111 297.593 M²
13 Poer Type P9 11.111 -
- Beton Ready Mix K-300 18.515 11.111 213.895 M³
- Tulangan U32 1,115.982 11.111 12,892.400 Kg
- Bekisting Pondasi 32.200 11.111 371.991 M²
14 Poer Type P12 11.111 -
- Beton Ready Mix K-300 24.553 11.111 283.643 M³
- Tulangan U32 1,416.860 11.111 16,368.292 Kg
- Bekisting Pondasi 37.450 11.111 432.642 M²
15 Kolom Pondasi K1 Uk. 45x45 cm 11.111 -
- Beton Ready Mix K-250 4.253 11.111 49.127 M³
- Tulangan U32 1,722.006 11.111 19,893.502 Kg
- Tulangan U24 167.824 11.111 1,938.789 Kg
- Bekisting Pondasi 37.800 11.111 436.685 M²
16 Kolom Pondasi K2 Uk. 30x30 cm 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Pondasi - 11.111 - M²
PEKERJAAN PONDASI
C. PEKERJAAN STRUKTUR
Struktur Lantai 1
1 Sloof Uk. 35x60 cm
- Beton Ready Mix K-250 51.441 11.111 594.276 M³
- Tulangan U32 10,291.281 11.111 118,890.189 Kg
- Tulangan U24 2,056.543 11.111 23,758.249 Kg
- Bekisting Sloof 396.833 11.111 4,584.414 M²
2 Sloof Uk. 25x55 cm 11.111 -
- Beton Ready Mix K-250 8.010 11.111 92.536 M³
- Tulangan U32 1,018.139 11.111 11,762.069 Kg
- Tulangan U24 263.044 11.111 3,038.816 Kg
- Bekisting Sloof 81.880 11.111 945.920 M²
3 Sloof Uk. 25x50 cm 11.111 -
- Beton Ready Mix K-250 18.295 11.111 211.353 M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 2,342.604 11.111 27,062.975 Kg
- Bekisting Sloof - 11.111 - M²
4 Sloof Uk. 20x40 cm 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
NO URAIAN PEKERJAAN VOLUME SAT
1 2 3 4
- Bekisting Sloof - 11.111 - M²
5 Sloof Uk. 15x40 cm 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Sloof 192.487 11.111 2,223.711 M²
6 Tutup Kolong Uk.10x30 cm (blk.35/60) 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh M6 - 11.111 - Kg
- Bekisting Sloof - 11.111 - M²
- Plesteran Tutup Kolong Uk.10x30 cm (blk.35/6 - 11.111 - M²
7 Tutup Kolong Uk. 10x35 (blk.25/55) 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh M6 0.363 11.111 4.188 Kg
- Bekisting Sloof 18.140 11.111 209.557 M²
- Plesteran Tutup Kolong Uk. 10x35 (blk.25/55) 7.250 11.111 83.756 M²
8 Tutup Kolong Uk.10/50 (blk.20/40) 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh M6 - 11.111 - Kg
- Bekisting Sloof 76.500 11.111 883.767 M²
- Plesteran Tutup Kolong Uk. 10/50 (blk.20/40) - 11.111 - M²
6 Kolom K1 Uk. 45x45 cm Lt.1 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 8.640 11.111 99.814 Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 45x45 Lt.1 - 11.111 - M²
7 Kolom K2 Uk. 30x30 cm Lt.1 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 30x30 Lt.1 - 11.111 - M²
8 Kolom K3 Uk. 20x20 cm Lt.1 11.111 -
- Beton Ready Mix K-250 1,577.156 11.111 18,220.120 M³
- Tulangan U32 70.308 11.111 812.234 Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 20x20 Lt.1 - 11.111 - M²
9 Kolom Praktis Uk.9x9 cm Lt.1 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting - 11.111 - M²
NO URAIAN PEKERJAAN VOLUME SAT
1 2 3 4
10 Balok Praktis Uk.9x9 cm Lt.1 (dinding) 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting 726.656 11.111 8,394.703 M²
Struktur Lantai 1
Struktur Lantai 2
1 Balok List Dack Uk.15/40 elv. 3.110
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok List 15/40 elv.3.11 - 11.111 - M²
2 List Plat Dack elv. 3.110 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
- Plesteran List Plat Dack elv. 3.110 - 11.111 - M²
3 Balok Uk. 35x60 cm Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok 35x60 cm Lt.2 - 11.111 - M²
4 Balok Uk. 25x55 cm Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Uk. 25x55 cm Lt.2 - 11.111 - M²
5 Balok Uk. 25x50 cm Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
6 Balok Uk. 20x40 cm Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 20.959 11.111 242.126 Kg
- Tulangan U24 3,211.200 11.111 37,097.440 Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Uk. 20x40 cm Lt.2 - 11.111 - M²
7 Balok Uk. 15x40 cm Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
NO URAIAN PEKERJAAN VOLUME SAT
1 2 3 4
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
8 Kolom K1 Uk. 45x45 cm (elv.4.00-8.00) Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 0.696 11.111 8.046 Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 45x45 Lt.2 - 11.111 - M²
9 Kolom K2 Uk. 30x30 cm (elv.4.00-8.00) Lt.2 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 4.530 11.111 52.333 Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 30x30 Lt.2 - 11.111 - M²
10 Kolom Praktis Uk.9x9 cm Lt.2 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 0.311 11.111 3.593 Kg
- Bekisting - 11.111 - M²
11 Balok Praktis Uk.9x9 cm Lt.2 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting - 11.111 - M²
elv.4.800 11.111 -
12 Balok Uk. 15x40 cm elv.4.8 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Uk. 15x40 cm elv.4.8 - 11.111 - M²
13 Kolom Praktis Uk.9x9 cm elv.4.8 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting - 11.111 - M²
13 List Plat Dack elv. 4.8 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
- Plesteran List Plat Dack elv. 4.8 - 11.111 - M²
elv.6.550 11.111 -
14 List Plat Dack elv. 6.55 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
- PlesteranList Plat Dack elv. 6.55 - 11.111 - M²
NO URAIAN PEKERJAAN VOLUME SAT
1 2 3 4
elv.6.800 11.111 -
15 Balok Uk. 25x55 elv.6.8 11.111 -
- Beton Ready Mix K-250 3.645 11.111 42.109 M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
16 Balok Uk. 20x45 elv.6.8 11.111 -
- Beton Ready Mix K-250 371.776 11.111 4,294.943 M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 29.432 11.111 340.014 Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Uk. 20x45 elv.6.8 - 11.111 - M²
17 Balok Uk. 20x40 elv.6.8 11.111 -
- Beton Ready Mix K-250 50.528 11.111 583.726 M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
18 Balok Uk.15x40 elv.6.8 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok 547.707 11.111 6,327.389 M²
- Plesteran Balok Uk.15x40 elv.6.8 - 11.111 - M²
19 Kolom K3 Uk. 20x20 cm elv.6.8 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Kolom - 11.111 - M²
- Plesteran Kolom Uk. 20x20 elv.6.8 - 11.111 - M²
20 Kolom Praktis Uk.9x9 cm elv.6.8 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 195.051 11.111 2,253.330 Kg
- Bekisting - 11.111 - M²
21 Plat Dack & List Plat Dack elv. 6.80 & 7.05 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
- Plesteran Plat Dack & List Plat Dack elv. 6.8 - 11.111 - M²
- Acian Plat Dack elv. 6.8 - 11.111 - M²
- Waterproofing Plat Dack elv. 6.8 - 11.111 - M²
NO URAIAN PEKERJAAN VOLUME SAT
1 2 3 4
elv.7.05 11.111 -
22 Balok List dack Uk.15x40 elv.7.05 11.111 -
- Beton Ready Mix K-250 471.805 11.111 5,450.537 M³
- Tulangan U32 116.051 11.111 1,340.681 Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
Elv.7.50 11.111 -
23 Ring Balok uk. 20x40 cm Elv.7.50 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok 2.708 11.111 31.284 M²
Elv.8.00 11.111 -
24 Ring Balok uk. 25x55 cm Elv.8.00 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
25 Ring Balok Praktis uk.9x9 cm Elv.8.00 11.111 -
- Beton K175 - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting - 11.111 - M²
Elv.9.80 11.111 -
26 Balok Dack uk. 20x40 cm Elv.9.80 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 9.986 11.111 115.359 Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Dack uk. 20x40 cm Elv.9.80 - 11.111 - M²
27 Plat Dack elv. 9.90 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
- Plesteran Plat Dack & List Plat Dack elv. 9.8 - 11.111 - M²
- Acian Plat Dack elv. 9.8 - 11.111 - M²
- Waterproofing Plat Dack elv. 9.8 - 11.111 - M²
Struktur Lantai 2
PEKERJAAN STRUKTUR
C. PEKERJAAN PLAT LANTAI
1 Plat Lantai 1
- Beton Ready Mix K-250 t =12 cm - 11.111 - M³
- Beton Ready Mix K-250 t = 10 cm 41.039 11.111 474.100 M³
- Wiremesh 2xM6 20.503 11.111 236.859 Kg
NO URAIAN PEKERJAAN VOLUME SAT
1 2 3 4
- Bekisting Lantai - 11.111 - M²
2 Plat Lantai 2 11.111 -
- Beton Ready Mix K-250 t =12 cm - 11.111 - M³
- Beton Ready Mix K-250 t = 10 cm 15.000 11.111 173.288 M³
- Wiremesh 2xM6 - 11.111 - Kg
- Bekisting Lantai - 11.111 - M²
PEKERJAAN PLAT LANTAI
D. PEKERJAAN TANGGA
Tangga Type T1 (2 Unit)
1 Balok Bordes uk. 15x40 cm
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok 103.900 11.111 1,200.308 M²
- Plesteran Balok Bordes 15/40 103.900 11.111 1,200.308 M²
2 Plat Bordes 11.111 -
- Beton Ready Mix K-250 t = 14 cm - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Bawah Bordes 15/40 - 11.111 - M²
NO URAIAN PEKERJAAN VOLUME SAT
1 2 3 4
3 Plat Tangga 11.111 -
- Beton Ready Mix K-250 t = 14 cm - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting Plat - 11.111 - M²
- Plesteran Bawah Plat tangga 15/40 - 11.111 - M²
4 Anak Tangga 11.111 -
- Beton Ready Mix K-250 19.671 11.111 227.250 M³
- Wiremesh M6 - 11.111 - Kg
- Bekisting - 11.111 - M²
Tangga Type T2 (1 Unit) 11.111 -
1 Balok Bordes uk. 15x40 cm 11.111 -
- Beton Ready Mix K-250 - 11.111 - M³
- Tulangan U32 - 11.111 - Kg
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Balok Bordes 15/40 - 11.111 - M²
2 Plat Bordes 11.111 -
- Beton Ready Mix K-250 t = 14 cm - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting Balok - 11.111 - M²
- Plesteran Bawah Bordes 15/40 - 11.111 - M²
3 Plat Tangga 11.111 -
- Beton Ready Mix K-250 t = 14 cm - 11.111 - M³
- Tulangan U24 - 11.111 - Kg
- Bekisting Plat - 11.111 - M²
- Plesteran Bawah Plat tangga 15/40 - 11.111 - M²
4 Anak Tangga 11.111 -
- Beton Ready Mix K-250 9.836 11.111 113.625 M³
- Wiremesh M6 - 11.111 - Kg
- Bekisting - 11.111 - M²
PEKERJAAN TANGGA
E. PEKERJAAN ATAP
1 Rangka Atap Baja Ringan Zincallume - 11.111 - M2
2 Atap Zincallume Color t =0,35 mm - 11.111 - M2
3 Prabung Atap Zincallume - 11.111 - M
4 List Plank Woodplak 2 lps 29.604 11.111 342.005 M
PEKERJAAN ATAP
E. PEKERJAAN PENGECATAN
Lantai 1
1 Cat Insterior Strukur - 11.111 - M2
2 Cat Exterior Strukur - 11.111 - M2
Lantai 2 -
1 Cat Insterior Strukur - 11.111 - M2
2 Cat Exterior Strukur - 11.111 - M2
NO URAIAN PEKERJAAN VOLUME SAT
1 2 3 4
PEKERJAAN PENGECATAN
JUMLAH TOTAL PEKERJAAN STRUKTUR
JUMLAH TOTAL PPN 10 %
JUMLAH TOTAL PEKERJAAN STRUKTUR + PPN 10 %
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
:
: PEMBANGUNAN GEDUNG RUANG OPERASI (OK)
: PEMBANGUNAN RUANG OPERASI (OK)
:
N :
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)
2 3 4 5 6
PENDAHULUAN
wplank 128.000 11.111 1,478.722 M' 2.2.1.4.a 65,488.50
1.000 1.000 Lsm 15,000,000.00
171.400 11.111 1,980.101 M' 2.2.1.2.a 304,623.00
PEKERJAAN PENDAHULUAN
PONDASI
g Pancang (Mini Pile / Ready 597.000 1,111.111 6,897.000 Btg 1,760,000.00
25, 8 D 13, ø 6 K 350 -6 m
ini Pile 25 x 25 K350 3,582.000 11,111.111 41,381.000 M' 120,000.00
ni Pile 199.000 1,111.111 2,299.000 Titik 40,000.00
ndasi 104.788 11.111 1,210.565 M³ 2.3.1.1 90,612.50
10 cm 12.328 11.111 142.419 M³ 2.3.1.11 141,845.00
5 cm 6.164 11.111 71.210 M³ 4.1.1.4 996,598.84
11.111 -
Mix K-300 - 11.111 - M³ B. 13.i.1 2,210,037.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
ndasi - 11.111 - M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 3.472 11.111 40.110 M³ B.13.i.2 2,210,037.50
2 296.345 11.111 3,423.528 Kg 4.1.1.17.b 18,317.75
ndasi 13.160 11.111 152.031 M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 3.136 11.111 36.229 M³ B.13.i.2 2,210,037.50
2 211.651 11.111 2,445.102 Kg 4.1.1.17.b 18,317.75
ndasi 7.980 11.111 92.189 M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 16.818 11.111 194.284 M³ B.13.i.2 2,210,037.50
2 1,574.462 11.111 18,188.998 Kg 4.1.1.17.b 18,317.75
ndasi 43.400 11.111 501.379 M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 4.991 11.111 57.659 M³ B.13.i.2 2,210,037.50
2 326.042 11.111 3,766.603 Kg 4.1.1.17.b 18,317.75
ndasi 10.780 11.111 124.536 M² 4.1.1.20.a 135,487.00
11.111 -
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)
2 3 4 5 6
Mix K-300 14.812 11.111 171.116 M³ B.13.i.2 2,210,037.50
2 892.786 11.111 10,313.920 Kg 4.1.1.17.b 18,317.75
ndasi 25.760 11.111 297.593 M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 18.515 11.111 213.895 M³ B.13.i.2 2,210,037.50
2 1,115.982 11.111 12,892.400 Kg 4.1.1.17.b 18,317.75
ndasi 32.200 11.111 371.991 M² 4.1.1.20.a 135,487.00
11.111 -
Mix K-300 24.553 11.111 283.643 M³ B.13.i.2 2,210,037.50
2 1,416.860 11.111 16,368.292 Kg 4.1.1.17.b 18,317.75
ndasi 37.450 11.111 432.642 M² 4.1.1.20.a 135,487.00
K1 Uk. 45x45 cm 11.111 -
Mix K-250 4.253 11.111 49.127 M³ B. 13.g.1 2,097,837.50
2 1,722.006 11.111 19,893.502 Kg 4.1.1.17.b 18,317.75
4 167.824 11.111 1,938.789 Kg 4.1.1.17.a 16,585.25
ndasi 37.800 11.111 436.685 M² 4.1.1.20.a 135,487.00
K2 Uk. 30x30 cm 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
ndasi - 11.111 - M² 4.1.1.20.a 135,487.00
PEKERJAAN PONDASI
STRUKTUR
i1
cm
Mix K-250 51.441 11.111 594.276 M³ B. 13.g.1 2,097,837.50
2 10,291.281 11.111 118,890.189 Kg 4.1.1.17.b 18,317.75
4 2,056.543 11.111 23,758.249 Kg 4.1.1.17.a 16,585.25
oof 396.833 11.111 4,584.414 M² 4.1.1.21.a 135,487.00
cm 11.111 -
Mix K-250 8.010 11.111 92.536 M³ B. 13.g.1 2,097,837.50
2 1,018.139 11.111 11,762.069 Kg 4.1.1.17.b 18,317.75
4 263.044 11.111 3,038.816 Kg 4.1.1.17.a 16,585.25
oof 81.880 11.111 945.920 M² 4.1.1.21.a 135,487.00
cm 11.111 -
Mix K-250 18.295 11.111 211.353 M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 2,342.604 11.111 27,062.975 Kg 4.1.1.17.a 16,585.25
oof - 11.111 - M² 4.1.1.21.a 135,487.00
cm 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)
2 3 4 5 6
oof - 11.111 - M² 4.1.1.21.a 135,487.00
cm 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
oof 192.487 11.111 2,223.711 M² 4.1.1.21.a 135,487.00
k.10x30 cm (blk.35/60) 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
6 - 11.111 - Kg 4.1.1.19 13,993.65
oof - 11.111 - M² 4.1.1.21.a 135,487.00
up Kolong Uk.10x30 cm (blk.35/6 - 11.111 - M² 4.4.2.3 73,386.90
k. 10x35 (blk.25/55) 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
6 0.363 11.111 4.188 Kg 4.1.1.19 13,993.65
oof 18.140 11.111 209.557 M² 4.1.1.21.a 135,487.00
up Kolong Uk. 10x35 (blk.25/55) 7.250 11.111 83.756 M² 4.4.2.3 73,386.90
k.10/50 (blk.20/40) 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
6 - 11.111 - Kg 4.1.1.19 13,993.65
oof 76.500 11.111 883.767 M² 4.1.1.21.a 135,487.00
up Kolong Uk. 10/50 (blk.20/40) - 11.111 - M² 4.4.2.3 73,386.90
5x45 cm Lt.1 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 8.640 11.111 99.814 Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 a 300,916.00
lom Uk. 45x45 Lt.1 - 11.111 - M² 4.4.2.3 73,386.90
0x30 cm Lt.1 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 a 300,916.00
lom Uk. 30x30 Lt.1 - 11.111 - M² 4.4.2.3 73,386.90
0x20 cm Lt.1 11.111 -
Mix K-250 1,577.156 11.111 18,220.120 M³ B. 13.g.1 2,097,837.50
2 70.308 11.111 812.234 Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 a 300,916.00
lom Uk. 20x20 Lt.1 - 11.111 - M² 4.4.2.3 73,386.90
k.9x9 cm Lt.1 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)
2 3 4 5 6
k.9x9 cm Lt.1 (dinding) 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
726.656 11.111 8,394.703 M² 4.1.1.20.a 135,487.00
Struktur Lantai 1
i2
Uk.15/40 elv. 3.110
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok List 15/40 elv.3.11 - 11.111 - M² 4.4.2.3 73,386.90
lv. 3.110 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
t Plat Dack elv. 3.110 - 11.111 - M² 4.4.2.3 73,386.90
0 cm Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok 35x60 cm Lt.2 - 11.111 - M² 4.4.2.3 73,386.90
5 cm Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Uk. 25x55 cm Lt.2 - 11.111 - M² 4.4.2.3 73,386.90
0 cm Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
0 cm Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 20.959 11.111 242.126 Kg 4.1.1.17.b 18,317.75
4 3,211.200 11.111 37,097.440 Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Uk. 20x40 cm Lt.2 - 11.111 - M² 4.4.2.3 73,386.90
0 cm Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)
2 3 4 5 6
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
5x45 cm (elv.4.00-8.00) Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 0.696 11.111 8.046 Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 b 224,636.50
lom Uk. 45x45 Lt.2 - 11.111 - M² 4.4.2.3 73,386.90
0x30 cm (elv.4.00-8.00) Lt.2 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 4.530 11.111 52.333 Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 b 224,636.50
lom Uk. 30x30 Lt.2 - 11.111 - M² 4.4.2.3 73,386.90
k.9x9 cm Lt.2 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 0.311 11.111 3.593 Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
k.9x9 cm Lt.2 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
11.111 -
0 cm elv.4.8 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Uk. 15x40 cm elv.4.8 - 11.111 - M² 4.4.2.3 73,386.90
k.9x9 cm elv.4.8 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
v. 4.8 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
t Plat Dack elv. 4.8 - 11.111 - M² 4.4.2.3 73,386.90
11.111 -
v. 6.55 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
Plat Dack elv. 6.55 - 11.111 - M² 4.4.2.3 73,386.90
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)
2 3 4 5 6
11.111 -
5 elv.6.8 11.111 -
Mix K-250 3.645 11.111 42.109 M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
5 elv.6.8 11.111 -
Mix K-250 371.776 11.111 4,294.943 M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 29.432 11.111 340.014 Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Uk. 20x45 elv.6.8 - 11.111 - M² 4.4.2.3 73,386.90
0 elv.6.8 11.111 -
Mix K-250 50.528 11.111 583.726 M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
elv.6.8 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok 547.707 11.111 6,327.389 M² 4.1.1.23.a 307,186.00
ok Uk.15x40 elv.6.8 - 11.111 - M² 4.4.2.3 73,386.90
0x20 cm elv.6.8 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lom - 11.111 - M² 4.1.1.22 b 224,636.50
lom Uk. 20x20 elv.6.8 - 11.111 - M² 4.4.2.3 73,386.90
k.9x9 cm elv.6.8 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 195.051 11.111 2,253.330 Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
Plat Dack elv. 6.80 & 7.05 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
t Dack & List Plat Dack elv. 6.8 - 11.111 - M² 4.4.2.3 73,386.90
ack elv. 6.8 - 11.111 - M² 4.4.2.27 44,682.00
g Plat Dack elv. 6.8 - 11.111 - M² 8.1.1.5. 49,500.00
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)
2 3 4 5 6
11.111 -
Uk.15x40 elv.7.05 11.111 -
Mix K-250 471.805 11.111 5,450.537 M³ B. 13.g.1 2,097,837.50
2 116.051 11.111 1,340.681 Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
11.111 -
20x40 cm Elv.7.50 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok 2.708 11.111 31.284 M² 4.1.1.23.a 307,186.00
11.111 -
25x55 cm Elv.8.00 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
tis uk.9x9 cm Elv.8.00 11.111 -
- 11.111 - M³ 4.1.1.4 996,598.84
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
- 11.111 - M² 4.1.1.20.a 135,487.00
11.111 -
20x40 cm Elv.9.80 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 9.986 11.111 115.359 Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Dack uk. 20x40 cm Elv.9.80 - 11.111 - M² 4.4.2.3 73,386.90
90 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
t Dack & List Plat Dack elv. 9.8 - 11.111 - M² 4.4.2.3 73,386.90
ack elv. 9.8 - 11.111 - M² 4.4.2.27 44,682.00
g Plat Dack elv. 9.8 - 11.111 - M² 8.1.1.5. 49,500.00
Struktur Lantai 2
PEKERJAAN STRUKTUR
PLAT LANTAI
2 3 4 5 6
ntai - 11.111 - M² 4.1.1.24.c 228,613.00
11.111 -
Mix K-250 t =12 cm - 11.111 - M³ B. 13.g.1 2,097,837.50
Mix K-250 t = 10 cm 15.000 11.111 173.288 M³ B. 13.g.1 2,097,837.50
xM6 - 11.111 - Kg 4.1.1.19 13,993.65
ntai - 11.111 - M² 4.1.1.24.a 353,716.00
EKERJAAN PLAT LANTAI
TANGGA
(2 Unit)
. 15x40 cm
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok 103.900 11.111 1,200.308 M² 4.1.1.23.a 307,186.00
ok Bordes 15/40 103.900 11.111 1,200.308 M² 4.4.2.3 73,386.90
11.111 -
Mix K-250 t = 14 cm - 11.111 - M³ B. 13.g.1 2,097,837.50
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
wah Bordes 15/40 - 11.111 - M² 4.4.2.3 73,386.90
HARGA
KODE
AIAN PEKERJAAN VOLUME SAT SATUAN
ANALISA
(Rp.)
2 3 4 5 6
11.111 -
Mix K-250 t = 14 cm - 11.111 - M³ B. 13.g.1 2,097,837.50
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
at - 11.111 - M² 4.1.1.24.a 353,716.00
wah Plat tangga 15/40 - 11.111 - M² 4.4.2.3 73,386.90
11.111 -
Mix K-250 19.671 11.111 227.250 M³ B. 13.g.1 2,097,837.50
6 - 11.111 - Kg 4.1.1.19 13,993.65
- 11.111 - M² 4.1.1.20.a 135,487.00
(1 Unit) 11.111 -
. 15x40 cm 11.111 -
Mix K-250 - 11.111 - M³ B. 13.g.1 2,097,837.50
2 - 11.111 - Kg 4.1.1.17.b 18,317.75
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
ok Bordes 15/40 - 11.111 - M² 4.4.2.3 73,386.90
11.111 -
Mix K-250 t = 14 cm - 11.111 - M³ B. 13.g.1 2,097,837.50
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
lok - 11.111 - M² 4.1.1.23.a 307,186.00
wah Bordes 15/40 - 11.111 - M² 4.4.2.3 73,386.90
11.111 -
Mix K-250 t = 14 cm - 11.111 - M³ B. 13.g.1 2,097,837.50
4 - 11.111 - Kg 4.1.1.17.a 16,585.25
at - 11.111 - M² 4.1.1.24.a 353,716.00
wah Plat tangga 15/40 - 11.111 - M² 4.4.2.3 73,386.90
11.111 -
Mix K-250 9.836 11.111 113.625 M³ B. 13.g.1 2,097,837.50
6 - 11.111 - Kg 4.1.1.19 13,993.65
- 11.111 - M² 4.1.1.20.a 135,487.00
PEKERJAAN TANGGA
ATAP
ja Ringan Zincallume - 11.111 - M2 8.1.1.3. 165,000.00
Color t =0,35 mm - 11.111 - M2 A.4.5.2.41.b 235,235.00
ncallume - 11.111 - M A.4.5.2.39. Err:509
plak 2 lps 29.604 11.111 342.005 M 8.1.1.4. 110,000.00
PEKERJAAN ATAP
PENGECATAN
2 3 4 5 6
PEKERJAAN PENGECATAN
JUMLAH TOTAL PEKERJAAN STRUKTUR
JUMLAH TOTAL PPN 10 %
JUMLAH TOTAL PEKERJAAN STRUKTUR + PPN 10 %
4.1.1 HARGA SATUAN PEKERJAAN BETON
4.1.1.4 Membuat 1 m³ lantai kerja beton mutu f'c =7,4 Mpa ( K 100), slump (3-6) cm ,w/c =0,87
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.1.1.5 Membuat 1 m³ beton mutu f'c =14,5 Mpa ( K 175), slump (12 ± 2) cm ,w/c = 0,66
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.1.1.7.a Membuat 1 m³ beton mutu f'c =19,3 Mpa ( K 225), slump (12 ± 2) cm ,w/c = 0,58 (Menggunakan Mo
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.1.1.21.b Pemasangan 1m² bekisting untuk sloof berulang
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4.1.1.22 b Pemasangan berulang 1m² bekisting untuk kolom (papan mal)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
B. 13.f.1 Membuat 1 m³ beton ready mix K 225 menggunakan pompa
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.35 Membuat 1m' kolom praktis beton bertulang (11 x 11) cm
A TENAGA
Pekerja L.01 OH 0.180
Tukang batu L.02 OH 0.020
Tukang kayu L.02 OH 0.020
Tukang besi L.02 OH 0.020
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.002
Paku 5 - 12 cm Kg 0.010
Minyak bekisting Liter
Besi beton polos Kg 3.000
Kawat beton Kg 0.450
Semen portland Kg 4.000
Pasir beton Kg 0.006
Batu pecah 1-2 cm Kg 0.009
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Pekerjaan per M3
mutu f'c =7,4 Mpa ( K 100), slump (3-6) cm ,w/c =0,87
106,000.00 127,200.00
125,000.00 25,000.00
135,000.00 2,700.00
115,000.00 6,900.00
JUMLAH TENAGA KERJA 161,800.00
1,360.00 312,800.00
57.14 51,028.57
370.37 380,370.37
JUMLAH HARGA BAHAN 744,198.94
905,998.94
90,599.89
996,598.84
106,000.00 174,900.00
125,000.00 34,375.00
135,000.00 3,780.00
115,000.00 9,545.00
JUMLAH TENAGA KERJA 222,600.00
1,360.00 443,360.00
57.14 43,428.57
370.37 381,111.11
- -
JUMLAH HARGA BAHAN 867,899.68
1,090,499.68
109,049.97
1,199,549.65
,3 Mpa ( K 225), slump (12 ± 2) cm ,w/c = 0,58 (Menggunakan Molen)
106,000.00 140,238.00
125,000.00 23,625.00
135,000.00 2,565.00
115,000.00 7,590.00
JUMLAH TENAGA KERJA 174,018.00
1,360.00 504,560.00
57.14 39,885.71
370.37 387,777.78
JUMLAH HARGA BAHAN 932,223.49
100,000.00 25,000.00
JUMLAH HARGA ALAT 25,000.00
1,131,241.49
113,124.15
1,244,365.64
106,000.00 7,420.00
125,000.00 8,750.00
135,000.00 945.00
115,000.00 460.00
JUMLAH TENAGA KERJA 17,575.00
12,500.00 131,250.00
13,000.00 1,950.00
JUMLAH HARGA BAHAN 133,200.00
106,000.00 7,420.00
125,000.00 8,750.00
135,000.00 945.00
115,000.00 460.00
JUMLAH TENAGA KERJA 17,575.00
14,000.00 147,000.00
13,000.00 1,950.00
JUMLAH HARGA BAHAN 148,950.00
106,000.00 2,650.00
125,000.00 3,125.00
135,000.00 3,375.00
115,000.00 115.00
JUMLAH TENAGA KERJA 9,265.00
11,500.00 117,300.00
13,000.00 650.00
JUMLAH HARGA BAHAN 117,950.00
106,000.00 55,120.00
125,000.00 32,500.00
135,000.00 3,510.00
115,000.00 2,990.00
JUMLAH TENAGA KERJA 94,120.00
1,800,000.00 23,400.00
15,500.00 4,650.00
8,000.00 1,000.00
JUMLAH HARGA BAHAN 29,050.00
123,170.00
12,317.00
135,487.00
106,000.00 55,120.00
125,000.00 32,500.00
135,000.00 3,510.00
115,000.00 2,990.00
JUMLAH TENAGA KERJA 94,120.00
1,800,000.00 23,400.00
15,500.00 4,650.00
8,000.00 1,000.00
JUMLAH HARGA BAHAN 29,050.00
123,170.00
12,317.00
135,487.00
Harga Satuan (Rp) Jumlah Harga (Rp)
106,000.00 55,120.00
125,000.00 32,500.00
135,000.00 3,510.00
115,000.00 2,990.00
JUMLAH TENAGA KERJA 94,120.00
1,800,000.00 23,400.00
15,500.00 4,650.00
8,000.00 1,000.00
JUMLAH HARGA BAHAN 29,050.00
JUMLAH HARGA BAHAN x 55 % 15,977.50
110,097.50
11,009.75
121,107.25
106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00
1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 28,500.00
1,800,000.00 23,400.00
12,000.00 24,000.00
JUMLAH HARGA BAHAN 154,100.00
273,560.00
27,356.00
300,916.00
Harga Satuan (Rp) Jumlah Harga (Rp)
106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00
1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 28,500.00
1,800,000.00 23,400.00
12,000.00 24,000.00
JUMLAH HARGA BAHAN 154,100.00
JUMLAH HARGA BAHAN x 55 % 84,755.00
204,215.00
20,421.50
224,636.50
106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00
1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 34,200.00
1,800,000.00 23,400.00
12,000.00 24,000.00
JUMLAH HARGA BAHAN 159,800.00
106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00
1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 34,200.00
1,800,000.00 23,400.00
12,000.00 24,000.00
JUMLAH HARGA BAHAN 159,800.00
JUMLAH HARGA BAHAN x 55 % 87,890.00
207,350.00
20,735.00
228,085.00
106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00
1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 28,500.00
1,800,000.00 23,400.00
12,000.00 72,000.00
JUMLAH HARGA BAHAN 202,100.00
106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00
1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 28,500.00
1,800,000.00 23,400.00
12,000.00 72,000.00
JUMLAH HARGA BAHAN 202,100.00
JUMLAH HARGA BAHAN x 55 % 111,155.00
230,615.00
23,061.50
253,676.50
106,000.00 69,960.00
125,000.00 41,250.00
135,000.00 4,455.00
115,000.00 3,795.00
JUMLAH TENAGA KERJA 119,460.00
59,730.00
1,800,000.00 72,000.00
15,500.00 6,200.00
- -
1,900,000.00 28,500.00
1,800,000.00 23,400.00
12,000.00 18,000.00
JUMLAH HARGA BAHAN 148,100.00
JUMLAH HARGA ALAT
207,830.00
20,783.00
228,613.00
Harga Satuan (Rp) Jumlah Harga (Rp)
106,000.00 106,000.00
125,000.00 31,250.00
135,000.00 3,375.00
115,000.00 11,500.00
JUMLAH TENAGA KERJA 152,125.00
1,200,000.00 1,224,000.00
JUMLAH HARGA BAHAN 1,224,000.00
4,000,000.00 480,000.00
JUMLAH HARGA ALAT 480,000.00
1,856,125.00
185,612.50
2,041,737.50
106,000.00 106,000.00
125,000.00 31,250.00
135,000.00 3,375.00
115,000.00 11,500.00
JUMLAH TENAGA KERJA 152,125.00
1,200,000.00 1,224,000.00
JUMLAH HARGA BAHAN 1,224,000.00
106,000.00 106,000.00
125,000.00 31,250.00
135,000.00 3,375.00
115,000.00 11,500.00
JUMLAH TENAGA KERJA 152,125.00
1,250,000.00 1,275,000.00
JUMLAH HARGA BAHAN 1,275,000.00
4,000,000.00 480,000.00
JUMLAH HARGA ALAT 480,000.00
1,907,125.00
190,712.50
2,097,837.50
Harga Satuan (Rp) Jumlah Harga (Rp)
106,000.00 106,000.00
125,000.00 31,250.00
135,000.00 3,375.00
115,000.00 11,500.00
JUMLAH TENAGA KERJA 152,125.00
1,350,000.00 1,377,000.00
JUMLAH HARGA BAHAN 1,377,000.00
4,000,000.00 480,000.00
JUMLAH HARGA ALAT 480,000.00
2,009,125.00
200,912.50
2,210,037.50
106,000.00 106,000.00
125,000.00 31,250.00
135,000.00 3,375.00
115,000.00 11,500.00
JUMLAH TENAGA KERJA 152,125.00
1,350,000.00 1,377,000.00
JUMLAH HARGA BAHAN 1,377,000.00
1,529,125.00
152,912.50
1,682,037.50
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
106,000.00 19,080.00
125,000.00 2,500.00
125,000.00 2,500.00
125,000.00 2,500.00
135,000.00 810.00
115,000.00 1,035.00
JUMLAH TENAGA KERJA 28,425.00
1,800,000.00 3,600.00
15,500.00 155.00
-
12,500.00 37,500.00
13,000.00 5,850.00
1,360.00 5,440.00
57.14 0.34
370.37 3.33
JUMLAH HARGA BAHAN 52,548.68
-
JUMLAH HARGA ALAT -
80,973.68
10% x D 8,097.37
89,071.04
7,361,243.29
A.4.2.1 Harga Satuan Pekerjaan Besi dan Alumunium
4,558.00
5,375.00
580.50
241.50
10,755.00
85,800.00
1,200.00
2,100.00
89,100.00
-
-
99,855.00
9,985.50
109,840.50
Jumlah Harga
(Rp.)
9,010.00
10,625.00
1,215.00
575.00
21,425.00
308,000.00
176,000.00
9,450.00
493,450.00
-
-
514,875.00
51,487.50
566,362.50
Jumlah Harga
(Rp.)
26,500.00
31,250.00
3,375.00
1,495.00
62,620.00
176,800.00
176,800.00
353,600.00
416,220.00
41,622.00
457,842.00
Jumlah Harga
(Rp.)
26,500.00
31,250.00
3,375.00
1,495.00
62,620.00
127,338.75
127,338.75
254,677.50
317,297.50
31,729.75
349,027.25
HARGA SATUAN PEKERJAAN PENUTUP ATAP
A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.750
Kepala tukang L.11 OH 0.080
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Zincalume Persegi Gelombang Warna 0,35 Lbr 1.050
Paku hak panjang 15 cm (Sekrup Zincalum) Kg 0.020
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 1.000
Kepala tukang L.11 OH 0.100
Mandor L.15 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Nok/Prabung Steel Sheet 0.35 lebar 333 mm Buah 1.200
Paku hak panjang 15 cm (Sekrup Zincalum) Kg 0.040
JUMLAH HARGA BAHAN
C PERALATAN
106,000.00 15,900.00
125,000.00 93,750.00
135,000.00 10,800.00
115,000.00 690.00
JUMLAH TENAGA KERJA 121,140.00
88,000.00 92,400.00
15,500.00 310.00
JUMLAH HARGA BAHAN 92,710.00
106,000.00 10,600.00
125,000.00 125,000.00
135,000.00 13,500.00
115,000.00 5,750.00
JUMLAH TENAGA KERJA 154,850.00
29,480.00 35,376.00
15,500.00 620.00
JUMLAH HARGA BAHAN 35,996.00
33,920.00
15,000.00
1,620.00
1,840.00
52,380.00
28,888.60
10,200.00
2,160.00
41,248.60
93,628.60
9,362.86
102,991.46
4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
31,800.00
18,750.00
2,025.00
1,725.00
54,300.00
8,486.40
1,920.00
10,406.40
64,706.40
6,470.64
71,177.04
21,200.00
12,500.00
1,350.00
1,150.00
36,200.00
4,420.00
4,420.00
40,620.00
4,062.00
44,682.00
4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik 60x60 cm Polished (ex Indogres) m2 1.050
Semen portland Kg 8.190
Pasir pasang m3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik 60x60 cm Unpolished (ex Indogres) m2 1.050
Semen portland Kg 8.190
Pasir pasang m3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.35 Pemasangan 1 m2 lantai keramik ukuran 30 x 30 cm Polish
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 cm Polish (ex Roman) m2 1.050
Semen portland Kg 10.000
Pasir pasang m3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 cm Unpolish (ex Roman) m2 1.050
Semen portland Kg 10.000
Pasir pasang m3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.41 Pemasangan 1 m' plint keramik ukuran 5cmx20cm
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.300
Semen portland Kg 0.570
Pasir pasang m3 0.0015
Semen warna Kg 0.013
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 2.650
Semen portland Kg 1.140
Pasir pasang m3 0.003
Semen warna Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
106,000.00 74,200.00
125,000.00 43,750.00
135,000.00 4,725.00
115,000.00 4,025.00
JUMLAH TENAGA KERJA 126,700.00
200,000.00 210,000.00
1,360.00 11,138.40
80,000.00 3,600.00
14,000.00 7,000.00
JUMLAH HARGA BAHAN 231,738.40
106,000.00 74,200.00
125,000.00 43,750.00
135,000.00 4,725.00
115,000.00 4,025.00
JUMLAH TENAGA KERJA 126,700.00
198,000.00 207,900.00
1,360.00 11,138.40
80,000.00 3,600.00
14,000.00 7,000.00
JUMLAH HARGA BAHAN 229,638.40
106,000.00 74,200.00
125,000.00 43,750.00
135,000.00 4,725.00
115,000.00 4,025.00
JUMLAH TENAGA KERJA 126,700.00
98,000.00 102,900.00
1,360.00 13,600.00
80,000.00 3,600.00
14,000.00 7,000.00
JUMLAH HARGA BAHAN 127,100.00
106,000.00 74,200.00
125,000.00 43,750.00
135,000.00 4,725.00
115,000.00 4,025.00
JUMLAH TENAGA KERJA 126,700.00
96,000.00 100,800.00
1,360.00 13,600.00
80,000.00 3,600.00
14,000.00 7,000.00
JUMLAH HARGA BAHAN 125,000.00
106,000.00 9,540.00
125,000.00 11,250.00
135,000.00 4,725.00
115,000.00 575.00
JUMLAH TENAGA KERJA 26,090.00
9,400.00 49,820.00
1,360.00 775.20
80,000.00 120.00
14,000.00 182.00
JUMLAH HARGA BAHAN 50,897.20
106,000.00 95,400.00
125,000.00 56,250.00
135,000.00 6,075.00
115,000.00 5,175.00
JUMLAH TENAGA KERJA 162,900.00
8,800.00 110,000.00
1,360.00 12,648.00
80,000.00 1,440.00
14,000.00 27,160.00
JUMLAH HARGA BAHAN 151,248.00
106,000.00 15,900.00
125,000.00 18,750.00
135,000.00 2,025.00
115,000.00 920.00
JUMLAH TENAGA KERJA 37,595.00
550,000.00 577,500.00
85,000.00 89,250.00
JUMLAH HARGA BAHAN 666,750.00
704,345.00
70,434.50
774,779.50
106,000.00 9,540.00
125,000.00 11,250.00
135,000.00 1,215.00
115,000.00 575.00
JUMLAH TENAGA KERJA 22,580.00
3,900.00 10,335.00
1,360.00 1,550.40
80,000.00 240.00
14,000.00 1,400.00
JUMLAH HARGA BAHAN 13,525.40
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA K
B BAHAN
Gypsum board Lembar 0.364
Paku skrup Kg 0.110
Rangka Plafond Metal Furing m2 1.000
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA
D Jumlah (A + B + C)
E Overhead & Provit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.5.1.7.a Pemasangan 1 m2 langit-langit GRC ukuran 120 x 240 mm tebal 4 mm + Rangka Plafon Metal Furing
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA K
B BAHAN
GRC tebal 4 mm Lembar 0.364
Paku skrup Kg 0.110
Rangka Plafond Metal Furing m2 1.000
JUMLAH HARGA B
C PERALATAN
JUMLAH HARGA
D Jumlah (A + B + C)
106,000.00 10,600.00
125,000.00 6,250.00
135,000.00 675.00
115,000.00 575.00
JUMLAH TENAGA KERJA 18,100.00
71,000.00 25,844.00
53,000.00 5,830.00
120,000.00 120,000.00
JUMLAH HARGA BAHAN 151,674.00
106,000.00 10,600.00
125,000.00 6,250.00
135,000.00 675.00
115,000.00 575.00
JUMLAH TENAGA KERJA 18,100.00
70,000.00 25,480.00
53,000.00 5,830.00
120,000.00 120,000.00
JUMLAH HARGA BAHAN 151,310.00
6,360.00
75,000.00
8,100.00
345.00
89,805.00
130,000.00
130,000.00
-
219,805.00
21,980.50
241,785.50
Jumlah Harga
(Rp.)
530.00
62,500.00
6,750.00
345.00
70,125.00
9,000.00
9,000.00
-
79,125.00
7,912.50
87,037.50
Jumlah Harga
(Rp.)
1,590.00
18,750.00
2,025.00
92.00
22,457.00
10,000.00
10,000.00
-
32,457.00
3,245.70
35,702.70
Jumlah Harga
(Rp.)
1,060.00
12,500.00
1,350.00
57.50
14,967.50
8,000.00
8,000.00
-
22,967.50
2,296.75
25,264.25
Jumlah Harga
(Rp.)
1,590.00
18,750.00
2,025.00
920.00
23,285.00
7,500.00
7,500.00
30,785.00
3,078.50
33,863.50
Jumlah Harga
(Rp.)
5,300.00
62,500.00
6,750.00
345.00
74,895.00
150,000.00
150,000.00
224,895.00
22,489.50
247,384.50
Jumlah Harga
(Rp.)
2,120.00
25,000.00
2,700.00
115.00
29,935.00
80,000.00
80,000.00
109,935.00
10,993.50
120,928.50
2,120.00
25,000.00
2,700.00
115.00
29,935.00
15,400.00
15,400.00
45,335.00
4,533.50
49,868.50
Jumlah Harga (Rp.)
1,060.00
12,500.00
1,350.00
575.00
15,485.00
250,000.00
250,000.00
-
265,485.00
26,548.50
292,033.50
Jumlah Harga
(Rp.)
1,590.00
18,750.00
2,025.00
92.00
22,457.00
176,000.00
1,750.00
177,750.00
-
200,207.00
20,020.70
220,227.70
Jumlah Harga
(Rp.)
1,802.00
21,250.00
2,295.00
103.50
25,450.50
437,800.00
2,450.00
440,250.00
-
465,700.50
46,570.05
512,270.55
Jumlah Harga
(Rp.)
1,590.00
18,750.00
2,025.00
920.00
23,285.00
459,800.00
459,800.00
-
483,085.00
48,308.50
531,393.50
A.4.7.1 Harga Satuan Pekerjaan Pengecatan
2,120.00
7,875.00
850.50
345.00
11,190.50
1,200.00
1,275.00
14,560.00
17,035.00
-
28,225.50
2,822.55
31,048.05
Jumlah Harga
(Rp.)
2,120.00
7,875.00
850.50
345.00
11,190.50
1,200.00
1,275.00
13,000.00
15,475.00
-
26,665.50
2,666.55
29,332.05
Jumlah Harga
(Rp.)
2,120.00
7,875.00
850.50
345.00
11,190.50
1,275.00
11,700.00
12,975.00
-
24,165.50
2,416.55
26,582.05
A.5.1.1 Harga Satuan Pekerjaan Sanitasi Dalam Gedung
349,800.00
137,500.00
1,350.00
18,400.00
507,050.00
2,000,000.00
7,200.00
2,007,200.00
-
-
2,514,250.00
251,425.00
2,765,675.00
Jumlah Harga
(Rp.)
349,800.00
137,500.00
1,350.00
18,400.00
507,050.00
4,000,000.00
14,400.00
4,014,400.00
-
-
4,521,450.00
452,145.00
4,973,595.00
Jumlah Harga
(Rp.)
127,200.00
181,250.00
20,250.00
6,900.00
335,600.00
660,000.00
8,160.00
800.00
66,000.00
734,960.00
-
-
1,070,560.00
107,056.00
1,177,616.00
Jumlah Harga
(Rp.)
127,200.00
181,250.00
20,250.00
6,900.00
335,600.00
540,000.00
8,160.00
800.00
54,000.00
602,960.00
-
-
938,560.00
93,856.00
1,032,416.00
Jumlah Harga
(Rp.)
127,200.00
181,250.00
20,250.00
6,900.00
335,600.00
660,000.00
8,160.00
800.00
66,000.00
734,960.00
-
-
1,070,560.00
107,056.00
1,177,616.00
Jumlah Harga
(Rp.)
3,180.00
37,500.00
4,050.00
1,725.00
46,455.00
650,000.00
319,100.00
969,100.00
-
-
1,015,555.00
101,555.50
1,117,110.50
Jumlah Harga
(Rp.)
1,060.00
12,500.00
1,350.00
575.00
14,910.00
15,000.00
15,000.00
-
-
29,910.00
2,991.00
32,901.00
Jumlah Harga
(Rp.)
1,060.00
50,000.00
5,400.00
575.00
57,035.00
30,000.00
87.50
30,087.50
-
-
87,122.50
8,712.25
95,834.75
Jumlah Harga
(Rp.)
1,060.00
50,000.00
5,400.00
575.00
57,035.00
245,000.00
87.50
245,087.50
-
-
302,122.50
30,212.25
332,334.75
Jumlah Harga
(Rp.)
1,060.00
50,000.00
5,400.00
575.00
57,035.00
170,000.00
87.50
170,087.50
-
-
227,122.50
22,712.25
249,834.75
Jumlah Harga
(Rp.)
1,060.00
50,000.00
5,400.00
575.00
57,035.00
500,000.00
87.50
500,087.50
-
-
557,122.50
55,712.25
612,834.75
HARGA SATUAN OVERHEAD DAN PROFIT (8.1.1.)
A TENAGA
D Jumlah (A+B+C)
E Ovrhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
D Jumlah (A+B+C)
E Ovrhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
N OVERHEAD DAN PROFIT (8.1.1.)
150,000.00
150,000.00
150,000.00
15,000.00
165,000.00
50,000.00
50,000.00
50,000.00
5,000.00
55,000.00
Harga Satuan Pekerjaan Timbal
Jumlah
overhead + provit 10%
BIAYA
KUANTITAS SATUAN
( Rp. )
5.00 6.00
1.00 1,550,000.00
1.00 120,000.00
1.00 23,851.12
1,693,851.12
overhead + provit 10% 169,385.11
1,863,000.00
Harga Satuan Pekerjaan R. RAD
54,600,000.00
8,190,000.00
62,790,000.00
62,790,000.00
6,279,000.00
69,069,000.00
PERHITUNGAN VOLUM
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi 39.000 x 26.000 = 1,014.000 M2
P1 A P1 B P2 P3
A'
A''
A 1.000
B 1.000
C 1.000
C' 1.000
D 2.00 5.000
11.000 4.000 2.000 9.000
11.000 4.000 4.000 27.000
tulangan
8 D 16 8.000 x 1.600 x 1.570 kg= 20.096 x
tulangan
14 D 16 14.000 x 1.600 x 1.570 kg= 35.168 x
2 Balok Dak 25/55 Elevasi + 4,00 A' 1.350 x 1.000 = 1.350 1.650 x
5.650 x 1.000 = 5.650 6.000 x
2.650 x 1.000 = 2.650 3.000 x
3.650 x 1.000 = 3.650 4.000 x
1.150 x 1.000 = 1.150 1.500 x
A 2.475 x 1.000 = 2.475 2.650 x
6.150 x 2.000 = 12.300 6.500 x
29.225
dikurangi Err:509 x =
Err:509 Err:509 x 0.250 =
Err:509 Err:509 x 0.200 =
Err:509 Err:509 x 0.200 =
Err:509 x 0.150 =
Err:509 Err:509 x 0.150 =
NO URAIAN PEKERJAAN PERHITUNGAN VOLUM
Dak 10.850 x 4.150 = 45.028
30.425 x 3.000 = 91.275 +
136.303 x 0.100 =
Wiremesh M6
221.375 x 1.750 x 3.070 = 1,189.337 Kg
176.000 Titk
1A P1 B P2 P3 P4 P6
x = -
Err:509 x 0.250 = Err:509
Err:509 x 0.200 = Err:509
Err:509 x 0.200 = Err:509
x 0.150 = Err:509
Err:509 x 0.150 = Err:509 +
Err:509 M2
PERHITUNGAN VOLUME
10.850 x 4.150 = 45.028
30.425 x 3.000 = 91.275 +
136.303 x 0.100 = 13.630 M3
98.600 M'
PERHITUNGAN VOLUME
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME
I Tangga I
1 Galian Tanah 6.000 x 0.600 x 0.500 = 1.800 M3
Tulangan
Dia 16 6.000 = 40.000 = 40.000 x
0.150
6.000 = 40.000 = 40.000 x
0.150
14.000 x
I Tangga 2
1 Galian Tanah 8.000 x 0.600 x 0.500 = 2.400 M3
Tulangan
Dia 16 8.000 = 53.333 = 53.000 x
0.150
8.000 = 53.333 = 53.000 x
0.150
14.000 x
M6 0.600 x 8.000 x 3.070 = 14.736 Kg
Tulangan
Dia 16 3.850 = 19.250 = 19.000 x 1.500 x
0.200
1.500 = 10.000 = 10.000 x 3.850 x
0.150
3.000 = 20.000 = 20.000 x 1.000 x
0.150
1.000 = 6.667 = 6.000 x 3.000 x
0.150
I Ram 1
1 Galian Tanah 9.800 x 0.550 x 0.500 = 2.695 M3
4 Pondasi beton
0.200 + 0.400 x 0.450 x 2.765
2.000
0.200 + 0.400 x 0.450 + 0.200 +
2.000 2.000
2.765 M3
Tulangan
dia.12-150 2.765 = 18.433 = 18.000 x
0.150
6.200 = 41.333 = 41.000 x
0.150
11.000 x
7.000 x
Tulangan
M6 3.500 x 2.765 x 3.070 x 2.000 =
9 Kolom Pondasi Uk. 35 x 35 0.350 x 0.350 x 0.650 x #REF! =
tulangan
8 D 16 8.000 x 1.600 x 1.570 kg= 20.096 x
tulangan
14 D 16 14.000 x 1.600 x 1.570 kg= 35.168 x
dikurangi Err:509 x =
Err:509 Err:509 x 0.250 =
Err:509 Err:509 x 0.200 =
Err:509 Err:509 x 0.200 =
Err:509 x 0.150 =
Err:509 Err:509 x 0.150 =
Wiremesh M6
221.375 x 2.000 x 3.070 = 1,359.243 Kg
Bekisting 221.375 x 1.000 x 1.000 = 221.375
116.600 x 0.100 x 1.000 = 11.660 +
233.035 -
Wiremesh M6
0.700 x 12.200 x 3.070 x 9.000 =
Wiremesh M6
43.706 x 1.000 x 3.070 = 134.178 Kg
21 Balok Dak Koridor 20/40 Elevasi + 7,5 3.700 x 1.000 = 3.700 4.000 x
3.700
= 0.792
4.000 = 0.540 +
1.332 M3
= 1.056
4.000 = 0.720 +
1.776 M3
12.480 Kg 12.480 Kg
5.254 Kg 5.254 Kg
2.044 M2
0.080
12.560 Kg
1.000 = 0.045 M2
= 0.693
= 0.360
25.000 = 0.866 +
1.919 M3
25.000 = 63.319 Kg
= 0.373
1.950 M3
= 0.581
0.581 M3
59.420
#REF! M3
- -
#REF! = #REF! +
#REF! Kg #REF! Kg
1.000 = 35.168 +
35.168 Kg 35.168 Kg
177.600 Kg 177.600 Kg
6,073.920 Kg 6,073.920 Kg
1.500 x 0.395 = 22.515 x 6.000 = 135.090
1,360.380 Kg 1,360.380 Kg
369.121 M2
12.000 = 78.000
12.000 = 36.000
2.000 = 2.000
8.000 = 26.000
4.000 = 12.000
8.000 = 28.000
4.000 = 10.000
192.000
1,808.640 Kg 1,808.640 Kg
162.135 M2
1.000 = 22.000
4.000 = 12.000
2.000 = 6.000
1.000 = 3.250
1.000 = 2.000
45.250
355.213 Kg 355.213 Kg
127.743
34.480 M2
1.000 = 2.500
1.000 = 0.800
1.000 = 4.500
2.000 = 1.840
9.640
40.102 Kg 40.102 Kg
26.070 Kg 26.070 Kg
4.725 M2
0.200 = 1.552
0.350 = 0.420 +
1.972 M3
39.430 M2
79.828 M3
23.410
2,831.024 Kg
2.000 = 4.000
1.000 = 11.588
1.000 = 1.320 +
16.908 M2
1.024
101.108 Kg
1.000 = 0.450
0.450 M2
0.080
12.560 Kg
2.000 = -
3.000 = -
4.000 = - +
- M2
3.323 M3 3.323 M3
= 844.905
93.465 M2 93.465 M2
13.500
2.000 = 4.000
1.000 = 8.000
1.000 = 1.500
0.550 = 1.997 M3 1.997 M3
239.760 Kg 239.760 Kg
17.064 Kg 17.064 Kg
16.940 M2
5.650
1.000 = 1.650
1.000 = 6.000 1.000
1.000 = 3.000
1.000 = 4.000
1.000 = 1.500
1.000 = 2.650
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
2.000 = 10.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
269.000
4,777.440 Kg 4,777.440 Kg
290.634 M2
12.000 = 78.000
12.000 = 36.000
2.000 = 2.000
8.000 = 26.000
4.000 = 12.000
8.000 = 28.000
4.000 = 10.000
192.000
1,808.640 Kg 1,808.640 Kg
1.000 = 7.850
3.000 = 1.950
1.000 = 0.650
3.000 = 12.000
1.000 = 4.000
6.000 = 18.000
1.000 = 3.000
1.000 = 3.000
1.000 = 3.000
2.000 = 6.000
1.000 = 19.000
1.000 = 1.100
1.000 = 1.650
1.000 = 2.000
1.000 = 4.000
1.000 = 2.250
1.000 = 0.800
1.000 = 3.000
93.250
732.013 Kg 732.013 Kg
247.231
68.240 M2
1.000 = 10.850
10.850
45.136 Kg 45.136 Kg
28.835
8.138 M2
1.000 = 2.500
1.000 = 4.500
2.000 = 1.840
8.840
36.774 Kg 36.774 Kg
23.898
4.395 M2
66.193 M3
-
Err:509
Err:509
Err:509
Err:509
Err:509 +
Err:509 M2
14.933 M3
5.255
12.250 +
17.505
552.640
1,256.000 +
1,808.640 Kg
60.060
140.000
200.060 - 12.805 = 187.255 M2 187.255 M2
2.000 = 3.040
1.000 = 8.775
1.000 = 0.990 +
12.805 M2
1.313
101.108 Kg
3.996 M3 3.996 M3
= 779.493
88.803 M2 88.803 M2
1.000 = 1.000
1.000 = 6.500
1.000 = 1.000
2.000 = 13.000
1.000 = 1.000
2.000 = 13.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 1.000
2.000 = 13.000
1.000 = 6.000 1.000
2.000 = 14.000
1.000 = 5.000
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
1.000 = 6.500
1.000 = 3.000
1.000 = 6.750
1.000 = 2.750
143.000
2,539.680 Kg 2,539.680 Kg
152.921 M2
1.000 = 2.500
2.500
44.400 Kg 44.400 Kg
10.073
1.151 Kg
3.875 M2
1.000 = 19.000
2.000 = 7.000
2.000 = 2.000
2.000 = 6.000
5.000 = 15.000
49.000
384.650 Kg 384.650 Kg
145.044
41.265 M2
1.000 = 2.500
4.000 = 12.000
2.000 = 13.000
27.500
215.875 Kg 215.875 Kg
11.697 Kg
33.020 M2
5.000 = 15.000
15.000
62.400 Kg 62.400 Kg
10.313 M2
1,359.243 Kg
50.181 = 182.854 M2 182.854 M2
33.244
0.625
9.170
5.080
2.063 +
50.181 M2
0.252 M3 0.252 M3
= 49.059
5.589 M2 5.589 M2
843.600 Kg 843.600 Kg
867.425 Kg 867.425 Kg
114.620 M2
= 61.620
0.420 x 0.395 = 132.886 +
194.506 194.506 Kg
21.600 M2
517.650
162.750 +
680.400 M2
43.134 43.134 Kg
9.600 M2
3.000 = 12.000
0.500 M3
29.625
8.325 M2
4.000 = 6.000
3.000 = 12.000 +
18.000
1.026 M3
13.680 M2
10.126 M3 10.126 M3
621.736 Kg
- -
9.000 = 2.745 M3
235.960 Kg
0.150 = 4.804
0.150 = #REF!
0.150 = #REF! +
#REF! M3 #REF! M3
854.080
#REF!
#REF!
#REF! Kg #REF! Kg
8.000 = 68.000
4.000 = #REF!
4.000 = #REF! +
#REF! - 2.640 = #REF! M2 #REF! M2
1.000 = 1.800
1.000 = 0.120
1.000 = 0.720 +
2.640 M2
12.000 = 48.000
16.000 = 12.800
60.800
2.448 M3
150.100
33.300 M2
3.000 = 41.100
2.000 = 10.000
51.100
1.521 M3
135.090 M3 135.090 M3
27.885 M2
3.934 M3 3.934 M3
134.178 Kg
- -
1.000 = 4.000
4.000
0.296 M3
10.863 Kg 10.863 Kg
2.960 M2
12.000 = 48.000
48.000
2.664 M3
33.300 M2
4.000 = 351.260 M2 351.260 M2
43.600 M'
TENTANG
DAFTAR HARGA SATUAN TANAMAN HIAS
DI KOTA PONTIANAK TAHUN 2010
Periode : Januari 2010
I. RUMPUT (LAWN)
1 Rumput gajah ( Axonopus sp )
a. Tandur 100 Titik/M2 M2
b. Lempeng, jarak lempeng + 2 cm 25 x 25 cm M2
2 Rumput golf (Tifton grass) Tandur 100 Titik/M2 M2
3 Rumput manila (Zoysia matrela),jrk lempeng 2 cm 25 x 25 cm M2
4 Rumput manila (Zoysia matrela) Tandur 100 Titik/M2 M2
II PENUTUP TANAH
1 Anggrek tanah (Sphatoglotis plicata), rumpun 35 - 40 2 btg, 3 anakan Polybag
2 Bayam merah (Alteanthera ficoidea), rumpun 20 - 25 1 btg/rumpun Polybag
3 Beludru coklat (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag
4 Beludru Hijau (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag
5 Botan (Centaurea candisina) 25 - 30 1 btg Polybag
6 Cendrawasih (Phyllantus sp) 15 - 20 Tajuk 20 - 25 Polybag
7 Cocor bebek (Kalanchoe pinnata) 15 - 20 1 btg Polybag
8 Crossandra 20 - 40 Tajuk 20 - 25 Polybag
9 Dinding ari (Hemigraphis colorata) 7 - 10 3 s/d 4 btg/rpn Polybag
10 Dracaena Tricolor 30 Polybag
11 Gandarusa 15 3 s/d 4 btg/rpn Polybag
12 Jengger ayam air mancur daun besar 15 - 20 dia. 1 btg Polybag
13 Jengger ayam air mancur daun kecil 15 - 20 dia. 1 btg Polybag
14 Jengger ayam a.m. protol besar 20 - 25 dia. Btg 1 cm Polybag
15 Jengger ayam a.m. protol kecil 20 - 25 dia. Btg 1 cm Polybag
16 Kembang coklat putih (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag
17 Kembang coklat merah muda (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag
18 Krokot (Althernantera amoenna) 10 5 btg/rpn Polybag
19 Lili paris bintang (Chlorophytum sp) 10 - 12 1 btg/rpn Polybag
20 Lili paris kasar (Ophiopogon jaburan) 20 - 25 5 s/d 7 btg/rpn Polybag
21 Lili paris kasar (Ophiopogon jaburan) 25-35 5 s/d 7 btg/rpn Polybag
22 Lili paris kucai (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag
21 Lili paris umbi (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag
22 Lili paris brazil (Chlorophytum sp) 15 - 20 3 s/d 5 btg/rpn Polybag
24 Mirten perak (Malphigia sp) 20 - 25 3 s/d 5 btg/rpn Polybag
25 Mirten rebah (Malphigia sp) 10 - 15 Tajuk 10 - 15 Polybag
26 Mirten tegak (Malphigia sp) 30 - 35 3 btg/rpn Polybag
27 Nanas kerang (Rhoeo discolor) 3-5 1 btg Polybag
28 Nanas merah (Ananas sp) 15-20 Tajuk 20 - 25 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
28 Nanas merah (Ananas sp) 30-40 Tajuk 20 - 25 Polybag
29 Seruni rambat (Wedelia trilobata) 10 3 s/d 5 btg/rpn Polybag
30 Sutra bombai banci (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag
31 Sutra bombai ungu (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag
32 Tagetes (Tagetes erecta) 20 - 25 Tajuk 15 - 20 Polybag
33 Nanas kerang (Rhoeo discolor) 20 1 btg Polybag
34 Katis kodok hijau (Sansiviera sp) isi 10 10 10 btg/pot Polybag
35 Katis kodok kuning (Sansiviera sp) isi 10 10 10 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
36 Pedang-pedangan strip kuning (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag
37 Pedang-pedangan strip hijau (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag
38 Pandan Kuning Africa 30 Polybag
39 Pangkas kuning kecil (Duranta repens) 10 3 s/d 5 btg/rpn Polybag
40 Pangkas kuning sedang (Duranta repens) 15 3 s/d 5 btg/rpn Polybag
41 Lantana Warna-Warni 15 3 s/d 5 btg/rpn Polybag
42 Taiwan Beauty bunga ungu (Cuphea sp) 25 Tajuk 15 Polybag
44 Taiwan Beauty bunga ungu (Cuphea sp) 16 Tajuk 15 Polybag
45 Cover Crop (Kacang-kacangan) 7-10 10 btg / rpn Polybag
III PERDU
1 Agave putih (Agave sp) 40 dia. Tajuk 30 Polybag
2 Agave biasa (Agave sp) 50 dia. Tajuk 40 Polybag
3 Aglonema (Aglaonema sp) 40 3 btg Polybag
4 Bilawan (Plumbago aphylia) 10 - 15 3 btg Polybag
5 Bougenvil berbunga bentukan penuh 60 dia.Tajuk 60 Polybag
6 Bougenvil hawai (Bougainvillea sp) 60 dia.Tajuk 60 Polybag
7 Bougenvil Biasa 60 dia.Tajuk 60 Polybag
8 Dendron biasa (Phillodendron sp) 15 - 20 1 btg Polybag
9 Dendrose lokal Jkt Merah 20 - 40 dia.Tajuk 10-15 Polybag
10 Balanceng india (Dieffenbachia sp) 30 3 daun/btg Polybag
11 Dracena tricolor (Dracena sp) 30 dia. Tajuk 30 Polybag
12 Kacapiring (Gardenia sp) 50 dia. Tajuk 30 Polybag
13 Pisang-pisangan (Heliconia sp) bunga
kuning / merah 50 2 s/d 3 btg/rpn Polybag
14 Spatiphylum lokal (Spatiphylum sp) 15 - 20 3 bth/pot Polybag
15 Spatiphylum luar (Spatiphylum sp) 15 - 20 3 btg Polybag
16 Beringin putih kecil (Ficus hybrida) ex Jkt 30 diaTajuk 15 -20 Polybag
17 Kamboja jepang (Adenium cutanium) bercabang 30 dia.Tajuk 15-20 Polybag
18 Kamboja putih 100 dia. Btg 3 Polybag
19 Kamboja rantai 100 dia. Btg 3 Polybag
20 Kana (Canna hibrida) 40 2 s/d 3 btg/rpn Polybag
21 Kastuba (Euphorbia pulcherima) 25 - 30 dia. Tajuk 30 Polybag
22 Kembang sepatu putih (Hibiscus mutabilis) 30 1 btg/pot Polybag
23 Lusiana 50 - 75 dia. Btg 1,5 Polybag
24 Mawar putih (Rosa Hybrida) 25 dia.Tajuk15 -20 Polybag
25 Mawar merah (Rosa Hybrida) 30 dia.Tajuk 15-20 Polybag
26 Melati costa (Jasminum sp) 50 2 anakan/rpn Polybag
27 Melati Gambir (Jasminum sp) 50 2 anakan/rpn Polybag
28 Melati Malaysia Polybag
29 Oleander (Nerium indicum) 30 1 rpn Polybag
30 Pepayungan (Cyperus altemifolius) 60 5 anakan/pot Polybag
31 Pandan hijau jepang (Pandanus sp) 50 1 rpn Polybag
32 Pandan kuning afrika 50 1 rpn Polybag
33 Pangkas Hijau 10 3 s/d 5 btg/rpn Polybag
33 Pangkas Hijau 20-40 3 s/d 5 btg/rpn Polybag
34 Variegata Polybag
34 Sambang darah 50 dia. Tajuk 30 Polybag
35 Siklok Polybag
36 Wali songo daun kecil (Scheffera sp) 50 1 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
37 Soka bangkok (Ixora sp) 20 1 btg/pot Polybag
38 Soka jepang bunga orange (Ixora sp) 20 1 btg/pot Polybag
39 Soka philipina (Ixora sp) 20 1 btg/pot Polybag
40 Soka siantan (Ixora tricia) 20 1 btg/pot Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
41 Soka singapura (Ixora cocineae) bunga
putih, pink 30 1 btg/pot Polybag
42 Soka jawa/hawai (Ixora sp) 30 1 btg/pot Polybag
43 Terang bulan daun putih/kuning (Thitonia sp) 20 3 s/d 5 btg/rpn Polybag
44 Tombak raja (Yucca gloriosa) 40 3 s/d 5 btg/rpn Polybag
45 Tapak dara 10 - 15 3 s/d 5 btg/rpn Polybag
46 Pangkas Hijau 3-5 3 s/d 5 btg/rpn Polybag
47 Pangkas Hijau 20 4 s/d 7 btg/rpn Polybag
48 Bayam Merah 10 - 15 3 s/d 5 btg/rpn Polybag
49 Soka Merah 20 1 btg/pot Polybag
50 Bawang-bawangan 15-20 f5 s/d 7 btg/rpn Polybag
51 Bawang-bawangan 20-25 f5 s/d 7 btg/rpn Polybag
52 Veberia Polybag
53 Vinolia 20-30 5 s/d 10btg/rpn Polybag
54 Vinolia 10-15 2 s/d 4 btg/rpn Polybag
55 Vinolia 35-40 12sd 20 btg/rpn Polybag
56 Variegata Polybag
57 Aires Polybag
58 Ketela Merah 10 1sd 2 btg/rpn Polybag
59 Kana Presiden 15 - 20 1sd 2 btg/rpn Polybag
IV TANAMAN PAGAR
1 Kedondong laut (Nothopanax sp) 30-65 3 s/d 4 btg/rpn Polybag
2 Kedondong laut (Nothopanax sp) 60 - 75 3 s/d 4 btg/rpn Polybag
3 Kemuning (Murraya paniculata) 75 1 btg/rpn Polybag
4 Lantana pagar (Lantana camara) 30 1rpn Polybag
5 Mangkokan (Nothopanax sp) 50 3 s/d 4 btg/rpn Polybag
6 Mirten pagar (Malphigia sp) 50 3 s/d 4 btg/rpn Polybag
7 The-tehan tinggi (Durantha repens) 30 3 s/d 4 btg/rpn Polybag
8 The-tehan tinggi (Durantha repens) 50 3 s/d 4 btg/rpn Polybag
9 The-tehan tinggi (Durantha repens) 70 3 s/d 4 btg/rpn Polybag
10 Krokot 15 Polybag
V TANAMAN MERAMBAT
1 Air mata pengantin ( Antigonon leptapus) 30 dia. Tajuk 430 Polybag
2 Air mata pengantin ( Antigonon leptapus) 50 dia. Tajuk 40 Polybag
2 Alamanda (Alamanda cathartica) 30 dia. Tajuk 20 Polybag
3 Alamanda (Alamanda cathartica) 50 dia. Tajuk 40 Polybag
4 Arabidea (Arabidea sp) 40 dia. Tajuk 30 Polybag
5 Flame of irian (Orange) 40 dia. Tajuk 30 Polybag
6 Kembang kelinci (Ipomea sp) 40 dia. Tajuk 30 Polybag
7 Kembang sungsang (Gloriosa superba) 30 dia. Tajuk 20 Polybag
8 Lantana rambut ungu (Lantana sp) 20 3 s/d 4 btg/rpn Polybag
9 Pasiflora 60 dia. Tajuk 40 Polybag
10 Sirih Gading daun strip kuning (Scindapsus sp) 30 3 s/d 4 btg/rpn Polybag
11 Sthephanot bunga putih
(Sthepanothis floribunda) 30 dia. Tajuk 40 Polybag
12 Nona Makan Sirih 30 Polybag
13 Ubi rambat Kuning 30 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
VI TANAMAN HIAS
1 Anjuang hijau (Dracaena sp) 60 dia. Tajuk 40 Polybag
2 Anjuang kribo (Dracaerna sp) 60 dia. Tajuk 40 Polybag
3 Anjuang kuning (Dracaerna sp) 60 dia. Tajuk 40 Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
4 Anjuang merah (Cordelyne terminalis) 40 dia. Tajuk 20 Polybag
5 Anjuang merah (Cordelyne terminalis) 60 dia. Tajuk 40 Polybag
6 Anjuang merah (Cordelyne terminalis) 80 dia. Tajuk 50 Polybag
7 Anjuang suji (Dracaena sp) 60 dia. Tajuk 40 Polybag
8 Azalea (Azalea sp) 50 dia. Tajuk 40 Polybag
9 Bakung kecil (Hymenochalys sp) 20 dia. Tajuk 40 Polybag
10 Beringin bonsai (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag
11 Beringin bonsai bentukan (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag
12 Beringin bonsai putih (Ficus benjamina) 250 dia. Tajuk 100 Polybag
13 Bonsai serut 151 - 200 dia. Tajuk 100 Polybag
14 Nusa indah merah/putih (Nussaenda sp) 50 dia. Tajuk 40 Polybag
15 Rambusa 50 Polybag
16 Pakis kelabang kuning (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag
17 Pakis krol (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag
18 Pakis monyet (Alsophila glauca) 150 - 200 dia. Tajuk 40 Polybag
19 Pisang kipas (Ravanela madagaskariensis) 200 - 250 dia. Btg 10 Polybag
20 Puring bor (Codiaeum sp) 75 dia. Tajuk 30 Polybag
21 Puring buntut (Codiaeum sp) 75 dia. Tajuk 30 Polybag
22 Puring gelatik (Codiaeum sp) 75 dia. Tajuk 30 Polybag
23 Puring jet (Codiaeum sp) 40 dia. Tajuk 20 Polybag
24 Puring jet (Codiaeum sp) 75 dia. Tajuk 30 Polybag
25 Puring ketapang (Codiaeum sp) 50 dia. Tajuk 30 Polybag
26 Puring nuri (Codiaeum sp) 60 dia. Tajuk 30 Polybag
27 Puring Kuning 20 dia. Tajuk 30 Polybag
28 Siklok dia. Btg 5 Polybag
29 Sikas/Pakis haji halus (Cycas revoluta) 80 dia. Btg 7,5 Polybag
30 Sikas diameter tajuk daun (Cycas sp) 100 dia. Btg 10 Polybag
31 Sikas medan (Cycas sp) 100 dia. Btg 10 Polybag
32 Sikas/pakis haji kasar (Cycas rumpi) 50 - 100 dia. Btg 7,5 Polybag
33 Kamboja kuning (Bali) tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag
34 Kamboja orange tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag
35 Lidah Buaya Besar 10-25 2-3 btg/pot Polybag
36 Lidah Buaya Kecil 50 5-7 btg/pot Polybag
VII PALEM
1 Kelapa gading (Cocos capitata) 200 - 250 dia. Btg 20 Phn
2 Kelapa sawit (Elais guineensis) 200 - 250 dia. Btg 40 Phn
3 Kelapa sayur (Cocos nucifera) 200 - 250 dia. btg 30 Phn
4 Kurma (Phoenix daetilifera) 100 dia. btg 30 Phn
5 Kurma (Phoenix daetilifera) >200 dia. Btg 40 Phn
6 Lontar (Borassus flabefiter) 300 dia. Btg 25 Phn
7 Palm anggur (Lalania loglgessu) 100 dia. Btg 15 Phn
8 Palm alexander 150 dia. Btg 10 Phn
9 Palm botol 150 - 200 dia. btg 30 Phn
10 Palm camedoria 100 3 s/d 5 btg/rpn Phn
11 Palm camedoria 200 3 s/d 5 btg/rpn Phn
12 Palm ekor tupai 50-75 Phn
13 Palm ekor tupai 200 dia. Btg 15 Phn
14 Palm jepang (Ptychosperma macarthurii) 100 - 150 5 s/d 7 btg/rpn Rmp
15 Palm jepang (Ptychosperma macarthurii) 150 - 250 5 s/d 7 btg/rpn Rmp
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
16 Palm kol (Licuala grandis) 100 dia. Btg 10 Phn
18 Palm kuning (Chrysalidocarpus lutescens) 50 - 100 3 s/d 5 btg/rpn Phn
19 Palm kuning (Chrysalidocarpus lutescens) 100 - 150 5 s/d 7 btg/rpn Rmp
20 Palm korembusa 50 dia. Btg 5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
21 Palm korembusa 100 dia. Btg 7 Phn
22 Palm korembusa >200 dia. Btg 10 Phn
23 Palm merah (Cyrtotachis lakka) 150 - 200 3 s/d 5 btg/rpn Phn
24 Palm merah (Cyrtotachis lakka) 300 - 350 5 s/d 7 btg/rpn Rmp
25 Palm phoeniks (Phoenix sp) 75 - 100 dia. Btg 8 Phn
26 Palm phoeniks (Phoenix sp) 150 - 200 dia. Btg 10 Phn
26 Palm putri 50 Phn
27 Palm putri 100-150 dia. Btg 10 Phn
28 Palm putri 150 - 200 dia. Btg 10 Phn
29 Palm pigni (Phoenix canariensis) 100 - 150 dia. Btg 10 Phn
30 Palm raja (Oredoxa regia) 100 - 200 dia. Btg 20 Phn
31 Palm raja (Super oredoxa regia) 200 - 300 dia. Btg 25 Phn
32 Palm ratu 100 - 150 dia. Btg 10 Phn
33 Palm sadeng (Livistonia rotundifolta) 50 dia. Btg 5 Phn
34 Palm saderi (Caroutamiti) 150 dia. Btg 8 Phn
35 Palm seledri tunggal tinggi 150 dia. Btg 8 Phn
36 Palm seledri tunggal putih 200 dia. Btg 8 Phn
37 Palm udang 50 3 s/d 5 btg/rpn Phn
38 Palm waregu (Rhapis excelsa) 150 5 s/d 7 btg/rpn Rmp
39 Pinang sirih (Areca catechu) 200 dia. Btg 10 Phn
X BUNGA POTONG
1 Amarilis (Amarylidaceae) 1 Tangkai
2 Anggrek macan (Arrachnis sp) 1 Tangkai
3 Anyelir 1 Tangkai
4 Apple blossom 1 Tangkai
5 Aster (Asteraceae sp) 1 Tangkai
6 Anggrek Dendrobium 1 Tangkai
7 Gladiol 1 Tangkai
8 Golden shower 1 Tangkai
9 Krisan (Chrysanthemum llini) 1 Tangkai
10 Mawar 1 Tangkai
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
XI TANAMAN TEDUH (INDOOR PLANT)
1 Anggrek bulan 40 -50 3 s/d 5 btg/rpn Polybag
2 Anggrek cathalea 40 -50 3 s/d 5 btg/rpn Polybag
3 Anggrek douglas kecil 40 -50 3 s/d 5 btg/rpn Polybag
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
4 Apple blossom 30 - 40 Polybag
5 Asparagus 30 - 40 dia. Tajuk 20 Polybag
6 Begonia daun besar 40 -50 dia. Tajuk 20 Polybag
7 Begonia daun Kecil 40 -50 dia. Tajuk 20 Polybag
8 Begonia Hijau 40-50 dia. Tajuk 20 Polybag
9 Begonia perak 40 -50 dia. Tajuk 20 Polybag
10 Belanceng bintik 40 -50 4 s/d 5 dn/pot Polybag
11 Belanceng putih 40 -50 4 s/d 5 dn/pot Polybag
12 Golden shower 50 dia. Tajuk 20 Polybag
13 Gandasari 30 - 40 dia. Tajuk 15 Polybag
14 Hortensia 30 - 40 dia. Tajuk 30 Polybag
15 Kembang kancing 30 - 40 dia. Tajuk 20 Polybag
16 Kencuran 30 - 40 dia. Tajuk 20 Polybag
17 Krisdoren 30 - 40 dia. Tajuk 15 Polybag
18 Kuping gajah 30 - 40 4 s/d 5 dn/pot Polybag
19 Kuping keledai 30 - 40 4 s/d 5 dn/pot Polybag
20 Maranta macan 30 - 40 dia. Tajuk 25 Polybag
21 Maranta batik 30 - 40 dia. Tajuk 25 Polybag
22 Maranta buntut ayam 30 - 40 dia. Tajuk 25 Polybag
23 Maranta keris 30 - 40 dia. Tajuk 25 Polybag
24 Maranta sepat 30 - 40 dia. Tajuk 25 Polybag
25 Meranti bintik 40 -50 dia. Tajuk 20 Polybag
26 Meranti kol 40 -50 dia. Tajuk 20 Polybag
27 Meranti mas koki 40 -50 dia. Tajuk 20 Polybag
28 Meranti pisang 40 -50 dia. Tajuk 20 Polybag
29 Monstera 50 - 75 4 s/d 5 dn/pot Polybag
30 Mutiara 40 -50 dia. Tajuk 20 Polybag
31 Pacing 40 -50 dia. Tajuk 20 Polybag
32 Dona Carmen 40-50 Polybag
33 Sisik Naga 30-40 Polybag
34 Palesota 20-30 Polybag
35 Diefenbachia 30-40 Polybag
36 Chiangmai 20-30 Polybag
37 Chiangmai balon 20-30 Polybag
38 Pilodendron dia. Tajuk 15 Polybag
39 Sabrina ungu 20 - 30 dia. Tajuk 15 Polybag
40 Bambu China 20-30 dia. Tajuk 20 Polybag
41 Sirih Gading 40 -50 dia. Tajuk 20 Polybag
42 Sri rejeki 30 - 40 4 s/d 5 dn/pot Polybag
43 Supelir foster kasar 30 - 40 dia. Tajuk 15 Polybag
44 Supelir halus 30 - 40 dia. Tajuk 15 Polybag
45 Tanduk rusa 40 -50 dia. Tajuk 20 Polybag
46 Walisongo biasa 50 - 100 dia. Btg 2 Polybag
47 Walisongo kuning 100 - 150 dia. Btg 3 Polybag
XII POHON PENEDUH
1 Angsana (Pterocarpus indicus) 100 - 200 dia. Btg 3 Phn
2 Asem Keranji (Pithecelluobium dulce) 150 - 200 dia.Btg 2,5s/d 4 Phn
3 Asem (Tamarindus indica) 150 - 200 dia.Btg 2,5s/d 4 Phn
4 Biola cantik 10 - 25 Phn
5 Bumi 10 - 25 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
6 Batavia 100 dia. Btg 5 Phn
7 Beringin (Ficus benjamina) 150 - 200 dia.Btg 2,5s/d 4 Phn
8 Beringin (Ficus benjamina) 200 - 300 dia. Btg 4 s/d 5 Phn
9 Beringin putih 200 dia. Btg 3,5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
10 Biola cantik (Ficus pandurata) 150 - 250 dia.Btg 2,5s/d 4 Phn
11 Bisbul (Diospyros discolor) 100 - 200 dia. Btg 3 Phn
12 Bunga kupu-kupu (Bauhunia purpurea) 400 - 500 dia.Btg 8s/d 10 Phn
13 Bunga saputangan(Amherstia nobilis) 0,50-100 dia. Btg 2 Phn
14 Bunga saputangan(Amherstia nobilis) 250-300 dia. Btg 3,5 Phn
16 Bungur (Lagerstromea loudonii) 50-100 Phn
17 Bungur (Lagerstromea loudonii) 100-150 dia. Btg 3,5 Phn
18 Bungur (Lagerstromea loudonii) 150 - 250 dia. Btg 3,5 Phn
19 Cassia golden 50-100 dia. Btg 3 Phn
20 Cassia golden 150-175 dia. Btg 3 Phn
21 Cassia golden 150-200 dia. Btg 3 Phn
22 Cassia sp 200 - 300 dia. Btg 4 s/d 5 Phn
23 Cempaka kuning (Michelia champaca) 300 - 400 dia. Btg 5 s/d 8 Phn
24 Ceremai 400 - 500 dia.Btg 8 s.d 10 Phn
25 Dadap hutan (Erythrina sp) 300 - 400 dia. Btg 5 s/d 8 Phn
26 Dadap kuning (Erythrina veriegata sp) 300 - 400 dia. Btg 5 s/d 8 Phn
27 Dadap kuning (Erythrina veriegata sp) 100 - 200 dia. Btg 5 s/d 8 Phn
28 Dadap merah (Erythrina christagali 150 - 200 dia. Btg 3,5 Phn
29 Dadap merah (Erythrina christagali 300 - 400 dia. Btg 5 s/d 8 Phn
30 Sungkai 50 - 100 Phn
31 Sungkai 150 Phn
31 Damar (Agathis alba) 500 - 700 dia. Btg > 10 Phn
32 Flamboyan (Delonix regia) 150 dia. Btg 2,5 Phn
33 Gemelina 300 dia. Btg 5 Phn
34 Glauka 100 - 150 dia. Btg 3 Phn
33 Glodogan 10 - 25 Phn
34 Glodogan (Polyalthea longifolia) 100-150 dia. Btg 3,5 Phn
35 Glodogan (Polyalthea longifolia) 150 - 200 dia. Btg 3,5 Phn
36 Glodogan (Polyalthea longifolia) 200 - 300 dia. Btg 4 s/d 5 Phn
37 Glodogan tiang (Sarracca sp) 50 Phn
38 Glodogan tiang (Sarracca sp) 150 - 300 dia. Btg 4 Phn
39 Glodogan tiang (Sarracca sp) 400 - 500 dia.Btg 8 s.d 10 Phn
40 Jatimas 200 - 300 dia. Btg 4 s/d 5 Phn
41 Jakaranda (Jacaranda acutifolia) 150 - 200 dia. Btg 3,5 Phn
42 Johar (Cassia siamea) 150 dia. Btg 3 Phn
43 Kamboja putih ( Plumeria rubra) 200 - 300 dia. Btg 4 s/d 5 Phn
44 Kamboja rantai 300 - 400 dia. Btg 5 s/d 8 Phn
45 Karet kebo (Ficus elastica) 100 dia. Btg 3 Phn
46 Kasia bunga kuning (Cassia multijuga) 150 - 200 dia. Btg 3,5 Phn
47 Kastuba (Euphorbia pulcherrima) 200 - 300 dia. Btg 4 s/d 5 Phn
48 Kayu manis (Cinnamon bumanni) 200 dia. Btg 3,5 Phn
49 Kayu manis (Cinnamon bumanni) 400 - 600 dia. Btg 8s.d10 Phn
50 Kayu putih (Maleucaa leucadendron) 200 - 300 dia. Btg 4 s/d 5 Phn
51 Kembang kupu-kupu (Bauhinia pupurea) 100-150 dia. Btg 3,5 Phn
52 Kembang kupu-kupu (Bauhinia pupurea) 150 - 200 dia. Btg 3,5 Phn
53 Kembang merak (Caesalpina pulcherrima) 100-150 dia. Btg 3 Phn
54 Kembang merak (Caesalpina pulcherrima) 200 dia. Btg 3 Phn
55 Kembang sepatu kuning (Hibiscus hybridus) 100 - 200 dia. Btg 3,5 Phn
56 Kenari (Canarium commune) 100 - 150 dia. Btg 3 Phn
57 Kenari (Canarium commune) 300 - 400 dia. Btg 5 s/d 8 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
58 Ketapang (Terminalia catappa) 150 - 200 dia. Btg 3,5 Phn
59 Ketapang (Terminalia catappa) 500 - 600 dia. Btg > 10 Phn
60 Kepuh 300 - 400 dia. Btg 5 s/d 8 Phn
61 Kiara payung (Filicium decipiens) 150 - 200 dia. Btg 3,5 Phn
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
62 Pucuk Merah Phn
63 Kurma 50 dia. Btg 3 Phn
64 Lampeni 150 - 200 dia. Btg 3,5 Phn
65 Mahoni (Swietania mahagoni) 20-40 dia. Btg 2 s/d 3 Phn
66 Mahoni (Swietania mahagoni) 30-50 dia. Btg 5 s/d 8 Phn
67 Mahoni (Swietania mahagoni) 50-75 dia. Btg 5 s/d 8 Phn
68 Mahoni diameter (Swietania mahagoni) 200 - 300 dia. Btg 4 s/d 5 Phn
69 Mangga (Mangifera indica) 500 - 800 dia. Btg > 10 Phn
70 Mangga Mardi Malaysia Phn
71 Sawo manila Phn
72 Jeruk Sambal calung Phn
73 Lengkeng Diamond Phn
74 Kedondong bangkok Phn
75 jambu Air bangkok Phn
76 jambu Batu Merah Phn
77 Matoa irian (Pometia pinata) 300 - 400 dia. Btg 5 s/d 8 Phn
78 Pucuk Merah 75-100 dia. Btg 5 s/d 8 Phn
79 Pule (Alsonia scholaris) 600 - 700 dia. Btg > 10 Phn
80 Salam 50 - 100 dia. Btg 3 Phn
81 Salam 10 - 25 Phn
82 Sikat botol 200 - 300 dia. Btg 4 s/d 5 Phn
83 Santorium 500 - 600 dia. Btg > 10 Phn
84 Sawo duren (Chrysophillium cainito) 150 - 200 dia. Btg 3,5 Phn
85 Sawo kecik (Chrysophillium sp) 200 dia. Btg 3,5 Phn
86 Sono keling/Sengon (Abaziafalcata) 150 - 200 dia. Btg 3,5 Phn
87 Spathodea campanulata 150 - 200 dia. Btg 3,5 Phn
88 Spathodea campanulata 500 - 600 dia. Btg > 10 Phn
89 Tabebuia 100 - 200 dia. Tajuk 50 - 70 Phn
90 Tanjung (Mimusops elengi) 10 - 25 Phn
91 Tanjung (Mimusops elengi) 60 -100 Phn
92 Tanjung (Mimusops elengi) 100-150 Phn
93 Tanjung (Mimusops elengi) 150-200 dia. Btg 3,5 Phn
94 Tanjung (Mimusops elengi) 200-250 dia. Btg 5 s/d 7 Phn
95 Tanjung (Mimusops elengi) 200 - 300 dia. Btg 4 s/d 5 Phn
96 Sirsak Madu 150 -200 dia. Btg 3,5 Phn
97 Melinjo 150 - 200 dia. Btg 3,5 Phn
98 Mahkota Dewa 150 - 200 dia. Btg 3,5 Phn
99 Trembesi (Samanea saman) 10 - 25 Phn
100 Trembesi (Samanea saman) 200 dia. Btg 3,5 Phn
101 Trembesi (Samanea saman) 400 - 500 dia. Btg 8s.d 10 Phn
102 Trembesi (Samanea saman) 600 - 700 dia. Btg > 10 Phn
103 Trenggulin (Cassia fistula) 50 - 150 dia. Btg 3 Phn
104 Walisongo (Alithurium macrolobium) 50 - 100 dia. Btg 3 Phn
104 Walisongo (Alithurium macrolobium) 200 dia. Btg 3,5 Phn
105 Walisongo (Alithurium macrolobium) 300 dia. Btg 5 Phn
106 Waru (Hibiscus tiliaceus) 500 - 600 dia. Btg > 10 Phn
107 Yangliu (Salyx babylonia) 150 - 200 dia. Btg 3,5 Phn
XIII BIJI
1 Bixa (Bixaceae sp) 1 Kg
2 Bunga kupu-kupu (Bauhunia pupurea) 1 Kg
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
3 Bungur (Largerstroemia loudonii) 1 Kg
4 Buni (Antidesma bunius) 1 Kg
5 Glodogan (Polyalthea longifolia) 1 Kg
6 Mahoni (Swietenia mahagoni) 1 Kg
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT
(cm) (cm)
1 2 3 4 5
7 Salam (Eugenia Polyanthum) 1 Kg
8 Tanjung (Mimusops elengi) 1 Kg
9 Trembesi (Samanea saman) 1 Kg
TERTANDA
PARYADI, S.Hut
TENTANG
TAR HARGA SATUAN TANAMAN HIAS
DI KOTA PONTIANAK TAHUN 2010
HARGA BAHAN
9,000
31,000
10,250
9,000
5,000
8,000
2,000
3,000
3,000
4,500
12,017
5,000
11,000
10,000
17,500
3,500
6,000
6,000
6,000
7,000
3,250
3,250
1,000
3,250
5,000
10,658
3,500
3,250
4,500
12,000
17,500
20,000
3,250
4,500
HARGA BAHAN
7,500
11,996
1,500
2,500
2,500
5,000
4,750
6,250
HARGA BAHAN
6
6,750
5,250
10,000
2,000
3,250
6,000
10,500
4,000
1,500
55,000
37,500
30,000
40,000
125,000
150,000
50,000
20,000
17,500
22,500
15,000
12,500
5,000
11,000
25,000
145,000
27,500
100,000
90,000
10,000
35,000
27,500
22,500
5,000
5,000
22,500
22,500
22,500
11,000
8,500
35,000
37,500
1,500
2,250
15,000
40,000
92,500
20,000
HARGA BAHAN
6,500
4,000
4,000
4,000
HARGA BAHAN
4,000
5,000
6,000
52,500
3,500
1,500
2,500
2,000
6,500
5,050
6,000
7,500
6,000
5,750
6,500
15,000
4,950
3,650
5,000
6,000
8,750
35,000
17,500
15,000
15,000
13,500
23,500
30,000
1,008
40,000
47,500
12,500
15,000
50,000
35,000
40,000
40,000
7,500
20,000
10,000
30,000
15,000
2,500
HARGA BAHAN
10,000
11,000
12,500
HARGA BAHAN
6
8,000
11,000
15,000
13,500
25,000
5,500
225,000
375,000
1,000,000
2,500,000
20,000
30,000
10,000
12,500
200,000
475,000
20,000
20,000
20,000
14,500
30,000
20,000
20,000
7,500
100,000
900,000
1,000,000
1,350,000
125,000
400,000
300,000
40,000
15,000
450,000
450,000
175,000
400,000
3,500,000
400,000
150,000
125,000
300,000
110,000
300,000
45,000
225,000
110,000
250,000
HARGA BAHAN
65,000
42,500
125,000
40,000
HARGA BAHAN
6
60,000
70,000
110,000
325,000
175,000
375,000
45,000
140,000
300,000
8,000,000
150,000
425,000
80,000
62,500
70,000
150,000
400,000
35,000
50,000
250,000
45,000
75,000
67,500
235,000
200,000
50,000
75,000
150,000
550,000
52,500
150,000
62,500
62,500
150,000
1,250,000
75,000
77,500
275,000
400,000
275,000
57,500
20,000
40,000
70,000
80,000
250,000
HARGA BAHAN
35,000
75,000
175,000
90,000
HARGA BAHAN
6
40,000
61,750
300,000
175,000
50,000
40,000
65,000
44,000
99,000
341,000
77,000
165,000
33,000
52,250
38,500
132,000
88,000
137,500
164,340
27,500
16,500
38,500
110,000
99,000
38,500
93,500
121,000
170,500
165,000
22,000
33,000
38,500
66,000
220,000
66,000
165,000
99,000
17,875
275,000
13,750
11,000
15,125
68,750
13,750
55,000
16,500
5,500
HARGA BAHAN
110,000
82,500
25,850
HARGA BAHAN
6
55,000
22,000
24,750
24,750
24,750
23,100
165,000
22,000
44,000
22,000
33,000
11,000
11,000
16,500
38,500
49,500
24,750
22,000
27,500
22,000
22,000
22,000
22,000
22,000
22,000
11,000
5,500
5,500
41,250
55,000
60,500
82,500
44,000
96,750
8,250
5,500
16,500
16,500
22,000
27,500
27,500
44,000
44,000
137,500
100,100
324,500
143,000
35,750
10,100
HARGA BAHAN
71,500
393,250
572,000
1,430,000
HARGA BAHAN
6
286,000
28,600
429,000
154,200
171,600
71,500
180,753
214,500
57,475
57,600
78,650
85,800
128,700
321,750
250,250
286,000
143,000
250,250
572,000
67,100
357,500
643,500
143,000
128,700
50,050
7,150
151,250
178,750
286,000
14,300
178,750
321,750
286,000
50,050
107,250
286,000
1,144,000
35,750
171,600
357,500
100,100
193,050
85,800
121,000
181,500
90,750
181,500
214,500
71,500
171,600
HARGA BAHAN
321,750
643,500
100,100
143,000
HARGA BAHAN
6
80,000
214,500
78,650
101,875
121,000
143,000
214,500
2,145,000
178,750
178,750
28,600
89,375
117,975
107,250
46,475
1,101,100
137,500
572,000
71,500
42,900
357,500
572,000
250,250
357,500
85,800
57,200
643,500
15,250
17,875
66,000
79,860
95,835
181,500
286,000
89,375
121,550
143,000
58,650
135,850
217,950
500,500
42,900
107,250
321,750
500,500
500,500
214,500
44,000
33,000
HARGA BAHAN
22,000
44,000
44,000
11,000
HARGA BAHAN
6
22,000
16,500
33,000
247,500
55,000
1,100,000
1,237,500
1,045,000
2,475,000
1,375,000
38,500
38,500
143,000
44,000
44,000
44,000
165,000
330,000
495,000
495,000
176,000
22,000
55,000
220,000
13,750
1,320,000
66,000
46,750
88,000
137,500
121,000
TERTANDA
PARYADI, S.Hut