Satuan Upah

DAFTAR SATUAN UPAH PEKERJA

NO. JENIS PEKERJA BANGUNAN HARGA UPAH


Rp.

1 PEKERJA 90,000
2 TUKANG BATU TERAMPIL 120,000
3 KEPALA TUKANG BATU 150,000
4 TUKANG KAYU TERAMPIL 130,000
5 KEPALA TUKANG KAYU 150,000
6 TUKANG CAT / PELITUR TERAMPIL 120,000
7 KEPALA TUKANG CAT / PELITUR 150,000
8 TUKANG BESI BETON TERAMPIL 120,000
9 KEPALA TUKANG BESI BETON 150,000
10 MANDOR 180,000
11 OPERATOR MEKANIK 150,000
12 PEMBANTU OPERATOR / MEKANIK 100,000
13 OPERATOR ALAT BERAT TERLATIH 150,000
14 SUPIR TRUK 120,000

Daftar Analis TARKIM Halaman : 1


Satuan Upah

ATUAN UPAH PEKERJA

SATUAN WAKTU

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM

Daftar Analis TARKIM Halaman : 2


Satuan Bahan

DAFTAR SATUAN HARGA BAHAN


TAHUN 2016

NO. JENIS BAHAN BANGUNAN SAT

1 2 3

A AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug m³
2 Sirtu m³
3 Pasir Teras m³
4 Pasir Pasang Kali m³
5 Pasir Beton m³
6 Abu Batu / Screen m³
7 Batu Gosok ( Apung ) kg
8 Screen m³
9 Batu Pecah Mesin 1/2 m³
10 Batu Pecah Mesin 2/3 m³
11 Batu Pecah Mesin 3/5 m³
12 Batu Pecah Mesin 5/7 m³
13 Batu Pecah Mesin 7/10 m³
14 Batu Pecah Mesin 10/15 m³
15 Batu Belah Pondasi 15/20 m³
16 Batu Bronjol ( Untuk Bronjong ) m³
17 Batu Koral Beton Kali ( Pecah Tangan ) m³
18 Batu Tempel Hitam m²
19 Batu Pinggir Beton 10 x 20 x 35 bh
20 Batu Pinggir Beton 15 x 35 x 50 ( K -225 ) bh
21 Batu Telor m³
22 Batako kecil 8 x 10 x 20 bh
23 Batako Besar 8 x 20 x 30 bh
24 Con Blok 8 x 20 x 40 (Holowblock) bh
25 Bata Merah Bakar Kelas I bh
26 Bata Merah Bakar Kelas II bh
27 Bata Merah Oven bh

Daftar Analisa TARKIM Halaman : 3+1


Satuan Bahan

28 Roster Beton 20 x 20 bh
29 Roster Beton 30 x 30 bh
30 Grass Blok 20 x 20 bh
31 Grass Blok 30 x 30 bh
32 Paving Blok Natural bh
33 Paving Blok Warna bh
34 Paving Blok Natural 6 cm m²
35 Paving Blok Warna 6 cm m²
36 Paving Blok Natural 8 cm m²
37 a. Bentuk Hexagonal (1m2 = 27 bh) bh
38 b. Bentuk Tiga Berlian (1m2 = 50 bh) bh
39 c. Bentuk Segi Panjang (1m2 = 50 bh) bh
40 Paving Blok Warna 8 cm m²
41 Paving Blok Biasa bh
42 Kanstin Paving Blok bh
43 Semen PC Tiga Roda / 50 kg *M080 zak
44 Semen PC Tiga Roda Kg
51 Kapur Sirih kg
61 Batu Sikat 0,5 / 2 cm m2

Daftar Analisa TARKIM Halaman : 4+1


Satuan Bahan

B BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
1 Plamir Tembok kg
2 Minyak bekisting Ltr
3 Cat Tembok ICI Eksterior ( BETON ) kg
4 Cat Tembok Kelas II Kg
5 Cat Tembok ICI Interior ( PLAFOND DAN DINDING ) lt
6 Cat Tembok Vinilex kg
7 Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt
8 Cat Tembok Sanlex kg
9 Cat Tahan Asam kg
10 Cat Berkilat/Cat kayu kg
11 Cat Jembatan *M090 kg
12 Plamir Kayu kg
13 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) lt
14 Cat Marka / Spotlight kg
15 Water Profing Emulsion kg
16 Water Profing Membrance ml
17 Rool Cat Tembok bh
18 Kape Tembok bh
19 Kape Kayu bh
20 Soligneum 1 blek 5 lt
21 Plincote kg
22 Pengawetan Kayu m³
23 Pengopenan Kayu m³
24 Kwas 3" bh
25 Kwas 2' bh
26 Oker kg
27 Oyan bks
28 Oten (Pewarna Plitur ) bks
29 Spirtus lt
30 Bahan Plitur Kripik ( Sirlak India ) kg
31 Dempul Lilin kg
32 Dempul Plitur kg
33 Dempul Halus / Imfra ( Wood Filler ) kg

Daftar Analisa TARKIM Halaman : 5+1


Satuan Bahan

34 Terpentin lt
35 Tiner A lt
36 Tiner B lt
37 Kumpon kg
38 Melamik kg
39 Impra kg
40 Dempul Plastik kg
41 Dempul Duco kg
42 Ampelas lbr
43 Dempul Kayu Cap Kucing kg
44 Meni Kayu / Besi kg
45 Meni Sincromat kg
46 Cat Kayu Sieve kg
47 Cat Besi Sieve kg
48 Cat Besi Duco Danaglos/ICI kg
49 Cat Bron kg
50 Sirlak kg
51 Lem Fox bh

4 Bambu Gombong bt
5 Kayu Kelas I Balok m³
6 Kayu kelas I papan m³
7 Kayu Kelas II Balok m³
31 Kayu Papan Borneo m³
32 Dolken 8 s/d 10 uk.4m' bt
37 List profil kamper 5 cm m1
43 Kayu Reng 3/4 Kamper Banjar m1
45 List profil Kayu Lokal KLs II 4 cm m1

D BAHAN PENUTUP RANGKA PLAFOND


1 Bahan plafond Enternit 4 mm m²
2 Bahan plafond hardpleks 5 mm 120 x 240 lbr
3 Bahan plafond Asbes Semen 5 mm m²
4 Gypsum 120 x 240 t = 9 mm ex DN lbr
5 Gypsum 120 x 240 t = 9 mm ex Luar lbr
6 Acustik Amstrong 60 x 120 lbr

Daftar Analisa TARKIM Halaman : 6+1


Satuan Bahan

7 GRC 120 x 240 lbr

E BAHAN KAYU LAPIS


1 Triplek 3 mm 120 x 240 lbr
2 Triplek 4 mm 120 x 240 lbr
3 Triplek 4 mm Ukuran Pintu lbr
5 Jabar Wood 4 mm lbr
6 Plywood 18 mm 120 x 240 lbr
7 Plywood 4 mm 120 x 240 lbr
8 Plywood 3 mm 120 x 240 lbr
9 Plywood 3 mm ukuran Pintu lbr
14 Wall Paper ( kls menengah ) m²
15 Multiplek 9 mm 120 x 240 lbr
16 Multiplek 12 mm 120 x 240 lbr
17 Multiplek 18 mm 120 x 240 lbr
18 Play Wood 18 mm 120 x 240 lbr
19 Teak Wood 3 mm 120 x 240 lbr
20 Teak Wood 4 mm 120 x 240 lbr
21 Teak Wood 3 mm 120 x 240 Ukuran Pintu lbr
22 Teak Wood ukuran Pintu 4 mm lbr
23 Tacon ( tahan bakar ) m²
24 Supercon m²
25 Melamin 4 mm 120 x 240 lbr
26 Melamin TIK 4 mm lbr
27 Formika 120 x 240 lbr
28 Formika Ukuran Pintu lbr

1 Tegel PC 20 x 20 bh
3 Tegel PC 30 x 30 bh
4 Plin Tegel PC 15 x 30 bh
5 Tegel Warna 20 x 20 bh
6 Plin Tegel Warna 10 x 20 bh
7 Tegel Warna 30 x 30 bh
8 Ubin Keramik 30 x 30 cm KW 1 dus
9 Ubin Keramik 20 x 20 cm KW 1 dus
10 Plin Tegel Warna 15 x 30 bh

Daftar Analisa TARKIM Halaman : 7+1


Satuan Bahan

11 Tegel Wafel PC 20 x 20 bh
12 Tegel Wafel Warna 20 x 20 bh

Daftar Analisa TARKIM Halaman : 8+1


Satuan Bahan

13 Tegel Badak PC 30 x 30 bh
14 Poslin 11 x 11 Warna Standar DN m²
15 Poslin 11 x 11 Warna Khusus DN m²
16 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos m²
17 Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip m²
18 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip m²
19 Keramik 20 x 20 (KM) KWI DN Putih Polos m²
20 Keramik 20 x 25 Dinding KM KWI DN Corak m²
21 Keramik 30 x 30 KW I DN putih polos m²
22 Keramik 30 x 30 KW I DN Warna/Corak / Anti Slip m²
23 Granito Tile Esenssza 40 x 40 polis m²
24 Granito Tile Esenssza 40 x 40 un polis m²
25 Granito Tile Esenssza 60 x 60 polis m²
26 Granito Tile Esenssza 60 x 60 un polis m²
27 Keramik 40 x 40 cm dus
28 Keramik Mozaik 30 x 30 cm dus
29 Vinyl Lantai standar m²
30 Karpet Kelas Baik LN m²
31 Karpet Kelas Sedang LN m²
32 Stairnosing keramik 10/20 bh
33 Stairnosing fiber m'
34 Taraso Kerang 30 x 30 m²
35 Plin Taraso 10 x 30 bh
36 Granit Alam LN Ukuran Besar m²
37 Granit Alam LN Ukuran Kecil m²
38 Granit Alam DN Ukuran Besar m²
39 Granit Alam DN Ukuran Kecil m²
40 Marmer Alam Lampung Ukuran Besar m²
41 Marmer Alam Lampung Ukuran Kecil m²
42 Marmer Alam Citatah Ukuran Besar m²
43 Marmer Alam Citatah Ukuran Kecil m²
44 Marmer Sintetis m²
45 Bata Karawang bh
46 Campuran untuk Kedap Air (AM) ltr
47 Lantai Parket m²
48 Stepnozing m'

Daftar Analisa TARKIM Halaman : 9+1


Satuan Bahan

49 Plint Keramik 5/20 bh


50 Keramik Lantai Antislip sekualitas Romance KW I Warna 33x33 cm m2
51 Keramik Lantai sekualitas Romance KW I Warna 33x33 cm m2

G BAHAN SALURAN AIR KOTOR / BERSIH


1 Grafel 1/2 d.20 cm m1
2 Grafel 1/2 d.30 cm m1
3 Grafel 1/2 d.40 cm m1
4 Buis Beton Ø 20 cm ( 1 m' ) m1
5 Buis Beton Ø 30 cm ( 1 m' ) bh
6 Buis Beton Ø 40 cm ( 1 m' ) bh
7 Buis Beton Ø 50 cm ( 1 m' ) bh
8 Buis Beton Ø 60 cm ( 1 m' ) *M031 bh
9 Buis Beton Ø 100 cm ( 0.50 m ) *M035 bh
10 Buis Beton Ø 80 cm ( 0.50 m ) *M033 bh
11 Buis Tanah Ø 10 cm ( 0.50 m ) bh
12 Buis Tanah Ø 15 cm ( 0.50 m ) bh
13 Buis Tanah Ø 20 cm ( 0.50 m ) bh
14 Buis Tanah Ø 25 cm ( 0.50 m ) bh
15 Injuk kg

Daftar Analisa TARKIM Halaman : 10+1


Satuan Bahan

H BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton U-24 Rata - Rata *M167' kg
2 Besi Beton U-39 / U-32 Rata - Rata *M167 kg
3 Pagar BRC Lengkap Tiang ( Tanpa Pondasi ) m²
4 Bondek m²
5 Ongkos Galfanis Besi kg
6 Kawat Duri m1
7 Kawat Pengikat m1
8 Kawat Bronjong 4 mm kg
9 Kawat Tembaga kg
10 Baja Siku / Profil DN kg
11 Baja IWF DN SII kg
12 Baja IWF Jepang kg
13 Baja Kontruksi Jembatan *M165 kg
14 Kawat Beton *M168 kg
15 Kawat Bronjong 4 mm *M162 kg
16 Kawat Tembaga kg
17 Baut Baja *M163 kg
18 Besi Galvanisir * M164 kg
19 Baja Tralis *M161 kg
20 Ram Nyamuk Hijau m²
21 Ram Kawat 1 x 1 cm m²
22 Ram Ayam m²
23 Kawat Kasa 1 x 1 cm ( Putih ) m²
24 Kawat Harmonika 4 cm m²
25 Kawat Harmonika 2 cm m²
26 Kawat Las Listrik kg
27 Wiremesh M8 m²
28 Wiremesh M6 m²
29 Timah kg
30 Timah Hitam kg
31 Ram Nyamuk Aluminium m²
32 Plat Srip Ø 2 x 30 mm ( 6 m1) bt
33 Plat Srip Ø 3 x 30 mm ( 6 m1) bt
34 Plat Alumunium 0.2 mm m²

Daftar Analisa TARKIM Halaman : 11+1


Satuan Bahan

35 Plat Alumunium 0.3 mm m²


36 Plat Alumunium 0.4 mm m²
37 Plat Alumunium 0.5 mm m²
38 Plat Alumunium 0.6 mm m²
39 Plat Alumunium 0.1 mm m²
40 Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " ) m1
41 Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " ) m1
42 Kusen Alumunium 4" CA m1
43 Daun Jendela Alumunium Natural ( Tanpa Kaca dan accessories ) m²
44 Daun Jendela Alumunium Warna ( Tanpa Kaca dan accessories ) m²
45 Daun Pintu Alumunium Natural ( tanpa kaca dan accessories ) m²
46 Daun Pintu Alumunium Warna ( tanpa kaca dan accessories ) m²
47 Handle Alumunium ( Tarikan Pintu Alumunium ) bh
48 Kait Angin alumunium ps
49 Karet Asisoris Kusen / Pintu Alumunium m1
50 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 ) m1
51 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) m1
52 Plat Besi Tipis 1 mm kg
53 Plat Besi Tipis 0.5 mm kg
54 Plat Besi 2 mm s/d 5 mm kg
55 Plat Besi 6 mm s/d 10 mm kg
56 Plat Besi 10 mm Ke atas kg
57 Lem Kuning (aibond) kg
58 Lem Fox kg
59 Pintu Besi Baja m2
60 Rolling door Besi m2
61 Pintu Aluminium m2
62 Pintu Swing 5mm unt
63 Pintu Swing 8mm unt
64 Teralis Besi strip m2
65 Besi Teralis m2

I BAHAN KACA
1 Kaca Polos 2 mm m²
2 Kaca Polos 3 mm m²
3 Kaca Polos 5 mm m²

Daftar Analisa TARKIM Halaman : 12+1


Satuan Bahan

4 Kaca Polos Tebal 8 mm m²


5 Kaca Polos Tebal 12 mm m²
6 Kaca Rayband 5 mm ( ASAHI ) m²
7 Kaca Rayband 8 mm ( ASAHI ) m²
8 Kaca Rayband 12 mm ( ASAHI ) m²
9 Kaca Patri Lokal Terpasang ( ASAHI ) m²
10 Kaca Patri EX Luar negeri terpasang m²
11 Kaca 6 mm Gravir m²
12 Glass Block DN 20 x 20 bh
13 Glass Block 20 x 20 Ex LN bh

Daftar Analisa TARKIM Halaman : 13+1


Satuan Bahan

J BAHAN PAKU DAN MUR BAUT


1 Paku 3 cm kg
2 Paku 5 cm s/d 7 cm / Paku Reng - Usuk kg
3 Paku 8 cm s/d 12 cm kg
4 Paku 2 cm s/d 4 cm /Paku Tripleks - Bilik kg
5 Paku 1/2 cm s/d 1 cm /Paku seng-Plat Poil kg
6 Paku Baja Jembatan *M166 kg
7 Paku Beton 2 cm s/d 5 cm kg
8 Paku Kait Lengkap bh
9 Paku Cacing kg
10 Paku Seng Glb. / Paku Asbes Glb. kg
11 Paku Skrup kg
12 Besi Beugel kuda - kuda kg
13 Duk Angker kg
14 Angker Mur Baut dia.19 / panjang 60 cm bh
15 Mur Baut HTB dia. 19 s/d 16 (5 cm) bh
16 Mur Baut Biasa dia.19 s/d 16 (5 cm) bh
17 Piser dia. 12 s/d 20 cm bh

K BAHAN PERPIPAAN 1.²


1 Besi Pipa untuk Hydrant BSP Ø 1" bt
2 Besi Pipa untuk Hydrant BSP Ø 1,25" bt
3 Besi Pipa untuk Hydrant BSP Ø 1,5" bt
4 Besi Pipa untuk Hydrant BSP Ø 2" bt
5 Besi Pipa untuk Hydrant BSP Ø 2,5" bt
6 Besi Pipa untuk Hydrant BSP Ø 3" bt
7 Besi Pipa untuk Hydrant BSP Ø 4" bt
8 Besi Pipa untuk Hydrant BSP Ø 6" bt
9 Hydrant bh
10 Besi Pipa Hitam Ø 1" t=2 mm bt
11 Besi Pipa Hitam Ø 2" t=2 mm bt
12 Besi Pipa Hitam Ø 3" t=2 mm bt
13 Besi Pipa Hitam Ø 4" t=2 mm bt
14 Besi Pipa Hitam Ø 6" t=2 mm bt
15 Pipa GIP Medium A Ø 1/2" ( 6 m1 ) bt
16 Pipa GIP Medium A Ø 3/4" ( 6 m1 ) bt

Daftar Analisa TARKIM Halaman : 14+1


Satuan Bahan

17 Pipa GIP Medium A Ø 1" ( 6 m1 ) bt


18 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 ) bt
19 Pipa GIP Medium A Ø 1 1/2" ( 6 m1 ) bt
20 Pipa GIP Medium A Ø 1 3/4"( 6 m1 ) bt
21 Pipa GIP Medium A Ø 2" ( 6 m1 ) bt
22 Pipa GIP Medium A Ø 2 1/2" ( 6 m1 ) bt
23 Pipa GIP Medium A Ø 3" ( 6 m1 ) bt
24 Pipa GIP Medium A Ø 4" ( 6 m1 ) bt

Daftar Analisa TARKIM Halaman : 15+1


Satuan Bahan

25 Macam2 Sambungan GIP Ø 1/2" bh


26 Macam2 Sambungan GIP Ø 3/4" bh
27 Macam2 Sambungan GIP Ø 1" bh
28 Macam2 Sambungan GIP Ø 1 1/4" bh
29 Macam2 Sambungan GIP Ø 11/2" bh
30 Macam2 Sambungan GIP Ø 13/4" bh
31 Macam2 Sambungan GIP Ø 2" bh
32 Macam2 Sambungan GIP Ø 2 1/2" bh
33 Macam2 Sambungan GIP Ø 3" bh
34 Macam2 Sambungan GIP Ø 4" bh
35 Pipa PVC RUCIKA type AW Ø 1/2" bt
36 Pipa PVC RUCIKA type AW Ø 3/4" bt
37 Pipa PVC RUCIKA type AW Ø 1" bt
38 Pipa PVC RUCIKA type AW Ø 1 1/4" bt
39 Pipa PVC RUCIKA type AW Ø 1 1/2" bt
40 Pipa PVC RUCIKA type AW Ø 2" bt
41 Pipa PVC RUCIKA type AW Ø 2 1/2" bt
42 Pipa PVC RUCIKA type AW Ø 3" bt
43 Pipa PVC RUCIKA type AW Ø 4" bt
44 Pipa PVC RUCIKA type AW Ø 6" bt
45 Pipa PVC RUCIKA type AW Ø 8" bt
46 Pipa PVC MASPION ABU Ø 1/2" (AW) bt
47 Pipa PVC MASPION ABU Ø 3/4" (AW) bt
48 Pipa PVC MASPION ABU Ø 1" (AW) bt
49 Pipa PVC MASPION ABU Ø 1 1/4" (AW) bt
50 Pipa PVC MASPION ABU Ø 1 1/2" (AW) bt
51 Pipa PVC MASPION ABU Ø 2" (AW) bt
52 Pipa PVC MASPION ABU Ø 2 1/2" (AW) bt
53 Pipa PVC MASPION ABU Ø 3" (AW) bt
54 Pipa PVC MASPION ABU Ø 4" (AW) bt
55 Pipa PVC MASPION ABU Ø 6" (AW) bt
56 Pipa GI Diameter 0,5" bt
57 Pipa GI Diameter 0,75" bt
58 Pipa GI Diameter 1" bt
59 Pipa GI Diameter 1,25" bt
60 Pipa GI Diameter 1,5" bt

Daftar Analisa TARKIM Halaman : 16+1


Satuan Bahan

61 Pipa GI Diameter 2" bt


62 Pipa GI Diameter 2,5" bt
63 Pipa GI Diameter 3" bt
64 Pipa GI Diameter 4" bt
65 Knie PVC Diameter 0,5" bh
66 Knie PVC Diameter 0,75" bh
67 Knie PVC Diameter 1" bh
68 Knie PVC Diameter 2" bh

Daftar Analisa TARKIM Halaman : 17+1


Satuan Bahan

69 Knie PVC Diameter 3" bh


70 Knie PVC Diameter 4" bh
71 Tee PVC Diameter 0,5" bh
72 Tee PVC Diameter 0,75" bh
73 Tee PVC Diameter 1" bh
74 Tee PVC Diameter 2" bh
75 Tee PVC Diameter 3" bh
76 Tee PVC Diameter 4" bh
77 Kran Diameter 0,5" bh
78 Fiet Kran Diameter 0,5" bh
79 Fiet Kran Diameter 0,75" bh
80 Fiet Kran Diameter 1" bh
81 Fiet Kran Diameter 2" bh
82 Fiet Kran Diameter 3" bh
83 Fiet Kran Diameter 4" bh
84 Macam2 Sambungan Paralon Ø 1/2" bh
85 Macam2 Sambungan Paralon Ø 3/4" bh
86 Macam2 Sambungan Paralon Ø 1" bh
87 Macam2 Sambungan Paralon Ø 1 1/4" bh
88 Macam2 Sambungan Paralon Ø 1 1/2" bh
89 Macam2 Sambungan Paralon Ø 1 3/4" bh
90 Macam2 Sambungan Paralon Ø 2" bh
91 Macam2 Samb. Paralon Ø 2 1/2" bh
92 Macam2 Samb. Paralon Ø 3" bh
93 Macam2 Samb. Paralon Ø 4" bh
94 Sambungan Pipa PVC Jenis AW 4 " TY bh
95 Lem Paralon bh
96 Solatip Leideng gl
97 Pipa PVC 4" berlobang jenis AW m1

L BAHAN SANITAIR
1 Stop Kran 1/2 " KIT bh
2 Stop Kran 3/4 " KIT bh
3 Stop Kran 1 " KIT bh
4 Stop Kran 1 1/2 " KIT bh
5 Stop Kran 2 " KIT bh

Daftar Analisa TARKIM Halaman : 18+1


Satuan Bahan

6 Stop Kran 2 1/2" KIT bh


7 Stop Kran 3 " KIT bh
8 Fiet kran 3/4" bh
9 Fiet kran 1" bh
10 Fiet kran 2" bh
11 Fiet kran 3" bh
12 Fiet kran 4" bh
13 Lem Paralon bh

Daftar Analisa TARKIM Halaman : 19+1


Satuan Bahan

14 Double Neple 1/2 " bh


15 Water Mur 1/2 " bh
16 Gate Walve 1/2 " bh
17 Saringan Air Lt KM Stainless Steel bh
18 Apooer Bath Tube bh
19 Kran stain less Lokal Kait bh
20 Shower Dengan Tiang bh
21 Shower Tanpa Tiang bh
22 Kran Tembok Sun Eui dia. 1/2 " bh
23 Kran Tembok ITAP dia. 1/2 " bh
24 Kran Bebek Sun Eui 1/2 " bh
25 Kran Bebek ITAP 1/2 " bh
26 Kran Panas Dingin San Eui Standard bh
27 Bath Cape Washteren unit
28 Tempat Sabun Poslin bh
29 Wastafel Lengkap TOTO LW 230 unit
30 Wastafel Lengkap INA unit
31 Closet Duduk Poslin (INA) Lengkap set
32 Closet Jongkok Poslin (INA) bh
33 Closet Jongkok Teraso bh
34 Closet Jongkok Poslin warna TOTO unit
35 Closet Jongkok Standard Putih Poslin TOTO unit
36 Closet Jongkok Lengkap Sistem Jet TOTO unit
37 Closet Duduk Warna Standard TOTO C 240 Lengkap unit
38 Wastafel Bulat Warna Standard Lengkap unit
39 Closet Duduk Warna Standard lengkap INA bh
40 Urinoar Lengkap TOTO Warna Standard lengkap unit
41 Penyekat Poslin Urinoar TOTO lbr
42 Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) bh
43 Kitchen Zink Stainless Non Standard Franke ( 1 Lobang ) bh
44 Kitchen Zink Stainless Non Standard Franke ( 2 Lobang ) bh
45 Selotip bh
46 Bak Mandi Teraso bh
47 Bak Mandi Fiber Glass 60 x 6 bh
48 Floordrain stainless bh

Daftar Analisa TARKIM Halaman : 20+1


Satuan Bahan

M BAHAN PENUTUP ATAP


1 Atap Plastik Gelombang 80 x 180 lbr
2 Atap Fiber Glass Tipis 80 x 180 (gelombang) lbr
3 Atap Fiber Glass Tebal 80 x 180 (gelombang) lbr
4 Atap Aluminium Natural USR 26 ( JAINDO ) m²
5 Atap Aluminium Warna USR 26 ( JAINDO ) m²
6 Atap Asbes Gel. Kecil 4 mm 80 x 180 lbr
7 Bubung Asbes lbr

Daftar Analisa TARKIM Halaman : 21+1


Satuan Bahan

8 Atap Asbes Gel. 4 mm 90 x 180 lbr


9 Atap Asbes Gel. 5 mm 90 x 180 lbr
10 Atap Asbes Gel. Besar 5 mm 90 x 240 lbr
12 Atap Multiroof m²
13 Atap Tegola Kwalitas Sedang m²
14 Aluminium foile m²
15 Atap Genteng Plentong pres Bakar KW 1 bh
16 Atap Genteng Plentong pres Molen Oven KW1 bh
17 Atap Genteng Flam pres Molen Oven Jatiwangi bh
18 Genting Morando bh
19 Bubung Genteng pres Bulat Ex Jatiwangi bh
20 Genteng Bubungan Ex Jatiwangi Segi Tiga bh
21 Genteng Bubungan Beton bh
22 Genteng Beton Warna 14,5/m2 bh
23 Genteng Beton Natural bh
24 Genteng Metal ( Rainbow Roof ) m²
25 Genteng Metal Hana m²
26 Nok Atas Metal ( Rainbow Roof ) m1
27 Nok Atas Metal Hana m1
28 Nok Pinggir Metal ( Rainbow Roof ) m1
29 Nok Pinggir Hana m1
30 Wall Flashing ( Rainbow Roof ) m1
31 Wall Flashing Hana m1
32 Atap Genteng Beton Warna 14,5/m2 m²
33 Genteng Beton Natural m²
34 Sirap Kelas I ( 80 / m2 ) bh
35 Sirap m²
36 Genteng Keramik bh
37 Genteng Keramik Natural Intan 14,5 / m2 m²
38 Genteng Keramik Glasur Standard 14,5 / m2 m²
39 Genteng Keramik Glasur Special 14,5 / m2 m²
40 Genteng Keramik Glasur Premium 14,5 / m2 m²
41 Genteng Murando Natural 1m2 = 18 bh bh
42 Genteng Murando Glasur 1m2 = 20 bh bh
43 Genting Magas bh
44 Genteng Super Roof Multicolor m²

Daftar Analisa TARKIM Halaman : 22+1


Satuan Bahan

45 Bubung Murando Natural bh


46 Bubung Murando Glasur bh
47 Bubungan Genteng Keramik bh
48 Bubungan Genteng Palentong bh
49 Bubungan Genteng Murando bh
50 Bubungan asbes bh
51 Bubungan Genting Flam bh
52 Bubungan Genting Magas eks banjar bh
53 Bubungan Genteng Super Roof Multicolor bh
54 Genteng Aspal bh
55 Genteng Kodok bh
56 Bubungan Genteng Kodok bh

Daftar Analisa TARKIM Halaman : 23+1


Satuan Bahan

N BAHAN MEKANIKAL
1 Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW ) unit
2 Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW ) unit
3 Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW ) unit
4 Presure Tank kap. 500 liter lengkap unit
5 Hydran Box dalam Gedung (lengkap) unit
6 Fire House 1.5 x 30 m + nose unit
7 Exhouse Fan H 360 W 60 x 60 cm unit
8 Exhouse Fan H 380 W CFM 55 x 55 cm unit
9 Exhouse Fan H 100 W 40 x 40 cm unit
10 AC Split 3 PK Setara TOSHIBA unit
11 AC Split 2 PK Setara TOSHIBA unit
12 AC Split 1 PK Setara TOSHIBA unit
13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) 1 BTU
14 AC Split 1 PK Setara Canghong unit
15 AC Split 2 PK Setara Canghong unit

O BAHAN ELEKTRIKAL 1.5


1 Kabel NYA 1x 1.5 Prima (1 rol = 50 m') ROLL
2 Kabel NYA 1x 2.5 Prima (1 rol = 50 m') ROLL
3 Kabel NYM 2 x 1.5 Prima (1 rol = 50 m') m'
4 Kabel NYM 3 x 1.5 Prima (1 rol = 50 m') m'
5 Kabel NYM 2 x 2.5 Prima (1 rol = 50 m') m'
6 Kabel NYM 3 x 2.5 Prima (1 rol = 50 m') m'
7 Kabel NYM 4 x 2.5 Prima (1 rol = 50 m') m'
8 Kabel NYM 2 x 4 Prima (1 rol = 50 m') m'
9 Kabel NYM 3 x 4 Prima (1 rol = 50 m') m'
10 Kabel NYM 4 x 4 Prima (1 rol = 50 m') m'
11 Kabel NYM 2 x 6 Prima (1 rol = 50 m') m'
12 Kabel NYM 3 x 6 Prima (1 rol = 50 m') m'
13 Kabel NYM 4 x 6 Prima (1 rol = 50 m') m'
14 Kabel NYM 2 x 10 Prima (1 rol = 50 m') m'
15 Kabel NYM 3 x 10 Prima (1 rol = 50 m') m'
17 Kabel NYM 4 x 16 Supreme (1 rol = 50 m') m'
18 Kabel NYY 2 x 4 Prima (1 rol = 50 m') m'
19 Kabel NYY 3 x 4 Prima (1 rol = 50 m') m'

Daftar Analisa TARKIM Halaman : 24+1


Satuan Bahan

20 Kabel NYY 4 x 4 Prima (1 rol = 50 m') m'


21 Kabel NYY 2 x 6 Prima (1 rol = 50 m') m'
22 Kabel NYY 3 x 6 Prima (1 rol = 50 m') m'

Daftar Analisa TARKIM Halaman : 25+1


Satuan Bahan

23 Kabel NYY 4 x 6 Prima (1 rol = 50 m') m'


24 Kabel NYY 2 x 10 Prima (1 rol = 50 m') m'
25 Kabel NYY 3 x 10 Prima (1 rol = 50 m') m'
26 Kabel NYY 4 x 10 Prima (1 rol = 50 m') m'
27 Kabel NYY 4 x 16 Prima (1 rol = 50 m') m'
28 Kabel Tembaga Kg
29 Kabel Tik 2 10 mm m'
30 NSFB FUJI EA - 100 A bh
31 NSFB FUJI EA - 150 A bh
32 Rumah Panel 30 x 60 cm (kosong) unt
33 Skring Kas 2 grop Biasa unt
34 Skring Kas 3 grop Biasa unt
35 Skring Kas 5 grop Biasa unt
36 MCB Mercury bh
37 MCB 1 PAS bh
38 MCB 3 PAS bh
39 Tahanan 50 A Merk Fuji bh
40 Saklar Tunggal Biasa bh
41 Saklar Ganda Biasa bh
42 Saklar Magnet 25 PK bh
43 Saklar Broko Tunggal Standard ( 1 Phase ) bh
44 Saklar Broko Seri Standard ( 1 Phase ) bh
45 Stop Kontak Biasa bh
46 Stop Kontak Putar bh
47 Stop Kontak Broko Standard ( 1 Phase ) bh
48 Stop Kontak Broko 3 Phase ( Out Bow ) bh
49 Stop Kontak Broko 3 Phase ( In Bow ) bh
50 Stop Kontak Handle 3 Phase bh
51 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat ) ttk
52 Lampu pijar 25 Watt s/d 100 Watt bh
53 Lampu Neon TL Philip 20 W bh
54 Lampu Neon TL Philip 40 W bh
55 Trapo TL 20 W ( Philip ) bh
56 Trapo TL 40 W ( Philip ) bh
57 Trapo TL 20 W ( Sinar ) bh
58 Trapo TL 40 W ( Sinar ) bh

Daftar Analisa TARKIM Halaman : 26+1


Satuan Bahan

59 Trapo Ballas bh
60 Stater Neon Philip bh
61 Stater Neon Biasa bh
62 Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan ) bh
63 Down Light + SL 25 W bh
64 Lampu SL Philip 25 W bh
65 Lampu Sirkel TL 20 W Lengkap bh
66 Lampu Mercuri 80 W bh

Daftar Analisa TARKIM Halaman : 27+1


Satuan Bahan

67 Lampu Mercuri 250 W bh


68 Lampu Son 150 W bh
69 Lampu Taman + Tiang + Lampu 1 Buah bh
70 Lampu Baret 30 cm + Neon bh
71 Lampu Neon Arcrilik 2 x 40 W lengkap bh
72 Pentanahan Penangkal Petir ttk
73 Pentanahan Panel ttk
74 Pipa Penangkal Petir bh
75 Box Sekering set
76 Box Lampu Mercury bh
77 Terminal Kabel bh
78 Tangkai Box lampu 3 m bh
79 Stainless steel m
80 Capasitor bh
81 Link Buckle bh
82 Stoping Buckle bh
83 Wed Clem bh
84 Tiang Besi 7m bh
85 Ignitor SN bh
86 Tap Connector bh
87 Foto Cell 6 Ampere bh

P BAHAN ALAT PENGANTUNG DAN KUNCI


1 Kunci Silinder ALFA untuk Pintu Alumunium bh
2 Tarikan Pintu bh
3 Kunci 2 Slaag ROYAL bh
4 Rel Henderson Lengkap bh
5 Rel Maraton I Pintu unt
6 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 bh
7 Kunci 2 Slaag Ancor Asli bh
8 Kunci 2 Slaag ISO bh
9 Kunci KM Bulat Kualitas Biasa bh
10 Kunci KM Bulat Sekwalitas ALFA bh
11 Kunci 2 Slaag Silinder Utama Standard bh
12 Kunci Gembok bh
13 Kunci tanam Slaag Royal bh

Daftar Analisa TARKIM Halaman : 28+1


Satuan Bahan

14 Kunci tanam Slaag Ancor bh


15 Kunci 2 Slaag Kuda Terbang bh
16 Kunci Jendela bh
17 Espangolet ps
18 Grendel Hitam Biasa 15 cm bh
19 Grendel 15 cm bh
20 Grendel 5 cm biasa bh
21 Hak Angin Kait Jendela Biasa ps

Daftar Analisa TARKIM Halaman : 29+1


Satuan Bahan

22 Hak Angin Jendela Antik ps


23 Hak Angin Sendok Stainless / Kuningan bh
24 Nako Lengkap Tralis 1 Daun dn
25 Sloot Pintu berikut Rantai bh
26 Sloot Jendela Tunggal bh
27 Engsel Pintu Biasa bh
28 Engsel Pintu Unilon Standard ps
29 Engsel Jendela Biasa bh
30 Engsel Jendela Unilon ps
31 Engsel Patrun ps
32 Engsel Harmonika m1
33 Engsel Floring unit
34 Door Closer Kelas Standard ( Kelas Sedang ) unt
35 Door Closer Kelas Standard ( Kelas Baik ) unt
36 Door Closer Kelas Rendah unt
37 Tarikan Almari Rata - rata bh
38 Seng BJLS 30 lebar 60cm (1 rol 50 m' ) m1
39 Seng BJLS 30 lebar 90cm (1 rol 50 m' ) m1
40 Reiling Tangga Stainlessteel m'

Q BAHAN PENGIKAT UNTUK KONTRUKSI JALAN


1 Hotmix Jadi berikut alat dan bahan bakar ( T = 5 cm => 9 m2 ) ton
2 Aspal ( ESO ) 1 Drum 150 Kg kg
3 Aspal Curah kg
4 Aspal RC 70 ( Cilacap ) kg
5 Aspal Bitumen * M061 kg
6 As Buton *M062 kg
7 Minyak Fluk *M063 Lt
8 Minyak Aspal *M064 Lt
9 Minyak Tanah *M065 Lt

R BAHAN PENGHISAP AIR SUMUR DALAM


1 Pompa Kodok unit
2 Pompa Dragon Tegal unit
3 Pompa Dragon Asli unit
4 Mesin Pompa Air 100 W - Sanyo unit

Daftar Analisa TARKIM Halaman : 30+1


Satuan Bahan

5 Mesin Pompa Air 150 W - Sanyo unit


6 Pompa Zet pump 250 W - Sanyo unit
7 Pompa Zet pump 450 W - Sanyo unit
8 Pompa Submersible kap. 150 liter/menit 3 kW unit
9 Gear Pump kap. 60 liter/menit unit
10 Deep Well dengan kelengkapannya kap. 150 liter/menit unit
11 Hand Oil Pump unit

Daftar Analisa TARKIM Halaman : 31+1


Satuan Bahan

S BAHAN PENAMPUNG AIR


1 Tangki Air Fiber Glass 0.5 m3 ( Excel ) bh
2 Tangki Air Fiber Glass 1 m3 ( Excel ) bh
3 Tangki Air Fiber Glass 2 m3 ( Excel ) bh
4 Bak Taraso WC 40 x 40 bh
5 Bak KM Taraso 60 x 60 bh

T BIAYA QUALITY CONTROL , IZIN - IZIN, PENGUKURAN


DAN BIAYA PENYAMBUNGAN
1 Penyambungan Listrik PLN 1w
2 IMB Bertingkat Rata - rata (Rumah ) m²
3 IMB Bertingkat Rata - rata (Kantor) m²
4 IMB tidak bertingkat Rata - rata (Rumah / Kantor) m²
5 IMB Bertingkat Rata - rata (untuk Usaha) m²
6 IMB tidak bertingkat Rata - rata (untuk Usaha) m²
7 Sondir Rata - rata 1 ttk
8 Pengukuran Site + Patok m²
9 Biaya Tes Jalan ( quality control ) ttk
10 Biaya Tes 1 Macam Beton 1 spl
11 Biaya Pengujian Bahan Agregat 1 spl
12 Biaya Pengujian Listrik + gambar + trafo & Adm 1 watt
13 Izin Sumur Artesis Lengkap unit
14 Penyambungan PDAM untuk rumah unit
15 Geolistrik 1 ttk
16 Geolistrik 1 ttk

U ALAT TUKANG.
1 Palu 0,5 kg bh
2 Cangkul bh
3 Singkup bh
4 Sekrop bh
5 Pengki bh
6 Linggis bh
7 Rool Meter 30 meter ( Bahan Plastik ) bh
8 Rool Meter 5 meter ( Bahan Besi ) bh
9 Selang Plastik untuk Water Pas dia. 0.5 cm bh

Daftar Analisa TARKIM Halaman : 32+1


Satuan Bahan

10 Water Pas Alumuniumm 60 cm bh

V STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK


TRUK, KENDARAAN RODA 4 & LAINNYA
1 Sewa Mesin Gilas 8 Ton s/d 10 ton hari
2 Tirud Roller 3 Jam / hari hari
3 Tamdam Roller 6 - 8 Ton 5 Jam / hr hari
4 Tamdam Roller 8 - 10 Ton 5 Jam / hr hari

Daftar Analisa TARKIM Halaman : 33+1


Satuan Bahan

5 Roller Viberator - Ped 1 Ton 4 Jam /hr hari


6 Roller Viberator - Self 7 Ton 5 Jam /hr hari
7 Roller 3 Wheeled - 8 Ton 5 Jam /hr hari
8 Roller Pneumatic 8 - 15 Ton 5 Jam /hr hari
9 Loader Wheeled 5 Jam /hr hari
10 Sewa Kran 30 Ton hari
11 Sewa Exavator Backhoe 5 Jam /hari hari
12 Sewa Draklint jam
13 Whell Loader jam
14 Buldozer 4 Jam /hr hari
15 Ecavator Hydr 1 m3 hari
16 Backu hari
17 Motor Grader 5 Jam /hr jam
18 Pheumatic Drill Hammer 3 Jam / hr hari
19 Vibro Roller hari
20 Stone Crusher hari
21 AMP hari
22 Teractor Equament 2 Jam /hr hari
23 Screning Plent 5 Jam /hr hari
24 Asphal Finisher hari
25 Asphal Melting Kalte hari
26 Asphal Spayer hari
27 Asphal MIxing Plant hari
28 Sprayer,Self - Prop. 10001 4 Jam/hr hari
29 Stamper, Viberator Plate 3 Jam /hari hari
30 Crusher / SCR hari
31 Concrete Mixer 0.125 m3 hari
32 Concrete Mixer 0.5 m3 hari
33 Concrete Viberator hari
34 Pick Up hari
35 Dump Truck 3.5 Ton hari
36 Dump Truck 5 Ton 4 Jam /hr hari
37 Flatbed Truck 3.5 Ton hari
38 Truck 3/4 ( Colt Disel ) hari
39 Truck Fuso hari
40 Mesin Las Listrik 18 pk 8 jam hari
41 Mesin Pompa Air 3 " hari
42 Stamper 8 Jam hari
43 Compresor Air hari

Daftar Analisa TARKIM Halaman : 34+1


Satuan Bahan

44 Pump Water ( 5 cm ) 30 m3 / hari hari


45 Trailler, Towed 1 Ton 3 Jam/hr hari
46 Water Tank Truck 2 Jam/hr hari

W BAHAN BAKAR DAN PELUMAS


1 Minyak Tanah lt
2 Kapur Bakar *M081 m³
3 Kayu Bakar *M070 m³
4 Bahan Bakar Residu lt

Daftar Analisa TARKIM Halaman : 35+1


Satuan Bahan

5 Minyak Solar lt
6 Bensin Premium lt
7 Plus Oil lt
8 Minyak Pelumas lt
9 Elpiji / botol 15 kg
10 Asitilin / botol 15.1 kg
11 Angin ( 02 ) / botol btl
12 Kawat Las Listrik kg
13 Karbit kg
14 Aspal ltr
15 Aspal Kemas Pand Grade 60/70 Drum
772 Pintu Air Sorong 50 x 50 cm
773 Pintu Air Double Stang 1 x 2 Meter
774 Pintu Air Double Stang 1,5 x 2 Meter
775 Pintu Air Double Stang 1 x 2,5 Meter
776 Pintu Air Double Stang 1,5 x 2,5 Meter
777 Pintu Air Stang Tunggal 1x 1,5 Meter
778 Pintu Air Stang Tunggal 0,5 x 1 Meter

X BAHAN FASILITAS LALU LINTAS


1 Rambu Jalan Uk. 45 x 45 cm bh
2 Rambu Jalan Uk. 60 x 60 cm bh
3 Rambu Jalan Uk. 70 x 70 cm bh
4 RPPJ Uk. 105 x 140 cm bh
5 RPPJ Uk. 120 x 160 cm bh
6 Pagar Pengaman Jalan bh
7 Marka Jalan (Road Marking) Uk. 0,2 x 12 cm m
8 Paku Marka uk. 2 x 10 x 10 cm bh
9 Paku Marka uk. 2 x 10 x 12 cm bh
10 Apill (Trafic Light)-Simpang Tiga unit
11 Apill (Trafic Light)-Simpang Empat unit
12 Lampu Peringatan (Warning Light) unit
13 Patok Tikungan (dilineator) bahan plastik bh
14 Patok Tikungan (dilineator) pipa besi bh
15 Cermin Tikungan unit
16 Kerucut Lalu Lintas Uk. 90 cm bh
17 Kerucut Lalu Lintas Uk. 75 cm bh
18 Kerucut Lalu Lintas Uk. 60 cm bh
19 Timbangan Portable unit

Daftar Analisa TARKIM Halaman : 36+1


Satuan Bahan

20 Peralatan PKB otomatik unit


21 Peralatan PKB semi otomatik unit
22 Peralatan Uji Pemeriksaan dan Pengawasan Kb di Jalan unit

Daftar Analisa TARKIM Halaman : 37+1


Satuan Bahan

ATUAN HARGA BAHAN


TAHUN 2016

HARGA SAT.
Rp.
4

360,000.00
360,000.00
250,000.00
360,000.00
360,000.00
130,000.00
9,750.00
130,000.00
560,000.00
560,000.00
560,000.00
560,000.00
560,000.00
560,000.00
560,000.00
560,000.00
600,000.00
150,000.00
150,000.00
150,000.00
200,000.00
1,400.00
2,000.00
3,500.00
1,400.00
1,200.00
2,350.00

Daftar Analisa TARKIM Halaman : 38+1


Satuan Bahan

10,000.00
15,000.00
20,000.00
25,000.00
3,500.00
3,700.00
50,000.00
55,000.00
60,000.00
3,500.00
2,800.00
2,500.00
30,000.00
3,500.00
30,000.00
85,000.00
1,800.00
850.00
40,000.00

Daftar Analisa TARKIM Halaman : 39+1


Satuan Bahan

15,600.00
10,000.00
35,490.00
9,100.00
26,617.50
14,950.00
86,190.00
10,400.00
41,405.00
49,400.00
58,305.00
14,300.00
45,500.00
115,342.50
97,597.50
57,330.00
20,475.00
6,825.00
5,000.00
45,500.00
26,000.00
35,000.00
477,750.00
9,750.00
6,500.00
29,000.00
2,730.00
2,730.00
8,200.00
16,000.00
17,500.00
2,750.00
27,300.00

Daftar Analisa TARKIM Halaman : 40+1


Satuan Bahan

3,900.00
11,050.00
16,500.00
16,250.00
37,375.00
29,500.00
30,550.00
24,000.00
2,000.00
18,500.00
15,600.00
20,000.00
44,000.00
42,250.00
54,600.00
40,950.00
50,000.00
13,000.00

22,500.00
3,500,000.00
4,500,000.00
2,000,000.00
2,730,000.00
58,500.00
4,400.00
2,850.00
2,200.00

100,000.00
150,000.00
50,000.00
95,000.00
120,000.00
350,000.00

Daftar Analisa TARKIM Halaman : 41+1


Satuan Bahan

240,000.00

75,000.00
85,000.00
55,000.00
66,000.00
340,000.00
85,000.00
75,000.00
55,000.00
36,800.00
150,000.00
185,000.00
340,000.00
340,000.00
100,000.00
120,000.00
85,000.00
86,300.00
89,300.00
47,700.00
180,000.00
195,000.00
160,150.00
94,000.00

800.00
2,750.00
5,000.00
3,400.00
2,350.00
8,636.36
13,636.36
6,000.00
3,400.00

Daftar Analisa TARKIM Halaman : 42+1


Satuan Bahan

1,500.00
2,500.00

Daftar Analisa TARKIM Halaman : 43+1


Satuan Bahan

2,350.00
85,000.00
85,000.00
85,000.00
85,000.00
85,000.00
85,000.00
85,000.00
85,000.00
85,000.00
286,650.00
204,750.00
300,300.00
218,400.00
120,000.00
120,000.00
21,050.00
608,300.00
237,500.00
8,200.00
14,550.00
21,850.00
4,950.00
1,597,000.00
1,228,500.00
1,078,300.00
997,750.00
180,800.00
122,800.00
477,700.00
282,500.00
273,000.00
6,750.00
24,700.00
320,000.00
14,400.00

Daftar Analisa TARKIM Halaman : 44+1


Satuan Bahan

5,500.00
60,000.00
55,000.00

20,000.00
30,000.00
40,000.00
40,000.00
60,000.00
80,000.00
100,000.00
120,000.00
200,000.00
160,000.00
7,500.00
10,500.00
14,500.00
17,500.00
12,000.00

Daftar Analisa TARKIM Halaman : 45+1


Satuan Bahan

8,000.00
9,000.00
82,300.00
110,500.00
5,500.00
2,350.00
5,200.00
6,750.00
4,550.00
8,950.00
9,250.00
10,900.00
24,550.00
8,550.00
6,500.00
4,500.00
20,400.00
34,000.00
14,000.00
9,500.00
9,500.00
10,000.00
16,900.00
21,450.00
26,000.00
20,400.00
31,200.00
25,500.00
32,000.00
20,400.00
11,050.00
20,400.00
26,500.00
62,150.00

Daftar Analisa TARKIM Halaman : 46+1


Satuan Bahan

80,700.00
96,850.00
109,200.00
126,350.00
33,550.00
125,000.00
130,000.00
55,000.00
40,500.00
43,000.00
53,300.00
71,000.00
68,250.00
81,900.00
4,000.00
21,850.00
27,300.00
9,500.00
10,150.00
8,200.00
8,200.00
8,200.00
36,800.00
13,000.00
400,000.00
400,000.00
150,000.00
825,000.00
1,200,000.00
80,000.00
450,000.00

32,000.00
34,000.00
38,000.00

Daftar Analisa TARKIM Halaman : 47+1


Satuan Bahan

66,000.00
70,000.00
61,350.00
273,000.00
443,550.00
716,550.00
2,934,750.00
1,225,800.00
20,150.00
68,250.00

Daftar Analisa TARKIM Halaman : 48+1


Satuan Bahan

9,000.00
9,000.00
9,000.00
9,500.00
9,800.00
14,000.00
15,000.00
650.00
12,500.00
14,000.00
6,750.00
9,500.00
9,500.00
14,000.00
4,700.00
4,000.00
3,400.00

83,700.00
88,400.00
95,950.00
111,300.00
341,250.00
471,500.00
668,100.00
1,105,650.00
210,000.00
74,350.00
133,750.00
238,800.00
307,000.00
409,500.00
70,000.00
85,300.00

Daftar Analisa TARKIM Halaman : 49+1


Satuan Bahan

126,800.00
164,700.00
196,200.00
232,000.00
286,600.00
381,400.00
464,000.00
611,500.00

Daftar Analisa TARKIM Halaman : 50+1


Satuan Bahan

4,000.00
5,200.00
8,200.00
10,000.00
11,500.00
17,200.00
23,800.00
34,000.00
40,950.00
47,700.00
21,800.00
30,700.00
38,200.00
53,200.00
68,800.00
94,100.00
120,000.00
180,200.00
279,750.00
539,100.00
784,800.00
12,750.00
16,500.00
22,500.00
31,450.00
40,450.00
69,950.00
83,850.00
154,300.00
204,750.00
481,000.00
35,000.00
44,000.00
51,900.00
120,000.00
130,000.00

Daftar Analisa TARKIM Halaman : 51+1


Satuan Bahan

109,250.00
300,250.00
185,000.00
272,300.00
1,000.00
1,400.00
4,800.00
19,900.00

Daftar Analisa TARKIM Halaman : 52+1


Satuan Bahan

35,900.00
81,650.00
1,400.00
1,800.00
3,600.00
4,300.00
5,950.00
900.00
20,400.00
32,000.00
54,600.00
91,500.00
301,000.00
695,750.00
2,601,300.00
5,400.00
5,400.00
14,900.00
16,400.00
16,400.00
16,400.00
17,000.00
17,000.00
41,000.00
47,800.00
28,000.00
5,500.00
1,950.00
26,600.00

23,800.00
27,300.00
177,450.00
245,700.00
614,250.00

Daftar Analisa TARKIM Halaman : 53+1


Satuan Bahan

696,150.00
61,300.00
54,600.00
71,000.00
200,000.00
431,300.00
712,500.00
5,400.00

Daftar Analisa TARKIM Halaman : 54+1


Satuan Bahan

3,000.00
8,300.00
34,000.00
34,000.00
196,000.00
36,000.00
184,200.00
102,300.00
68,250.00
27,300.00
122,850.00
40,950.00
170,500.00
1,633,800.00
34,000.00
941,850.00
511,800.00
1,706,250.00
109,200.00
60,350.00
314,400.00
150,150.00
1,556,000.00
1,433,000.00
1,177,250.00
1,098,750.00
1,276,200.00
344,000.00
160,000.00
200,000.00
225,000.00
1,300.00
204,000.00
95,500.00
20,000.00

Daftar Analisa TARKIM Halaman : 55+1


Satuan Bahan

18,000.00
32,500.00
64,000.00
111,000.00
127,500.00
36,000.00
22,000.00

Daftar Analisa TARKIM Halaman : 56+1


Satuan Bahan

40,000.00
46,000.00
68,700.00

200,000.00
6,000.00
950.00
1,200.00
750.00
1,600.00
3,500.00
2,800.00
3,300.00
5,300.00
16,350.00
170,550.00
123,750.00
111,800.00
60,000.00
77,700.00
60,000.00
77,700.00
60,000.00
70,900.00
16,350.00
750.00
136,500.00
6,100.00
78,000.00
87,750.00
93,000.00
104,650.00
1,650.00
3,500.00
1,050.00
148,000.00

Daftar Analisa TARKIM Halaman : 57+1


Satuan Bahan

2,800.00
6,900.00
6,650.00
1,600.00
5,450.00
20,400.00
1,700.00
1,950.00
60,375.00

2,000.00
1,950.00

Daftar Analisa TARKIM Halaman : 58+1


Satuan Bahan

47,775,000.00
163,800,000.00
409,500,000.00
23,887,500.00
4,231,500.00
3,412,500.00
4,777,500.00
4,231,500.00
819,000.00
11,943,750.00
8,872,500.00
4,777,500.00
1,950.00
3,500,000.00
4,500,000.00

48,300.00
77,300.00
3,700.00
4,600.00
5,600.00
4,800.00
6,150.00
6,700.00
8,400.00
8,900.00
6,900.00
9,500.00
12,600.00
12,200.00
16,150.00
18,350.00
8,500.00
7,300.00

Daftar Analisa TARKIM Halaman : 59+1


Satuan Bahan

12,200.00
8,500.00
9,100.00

Daftar Analisa TARKIM Halaman : 60+1


Satuan Bahan

11,350.00
9,800.00
13,500.00
16,500.00
375,700.00
33,800.00
4,200.00
522,000.00
1,350,000.00
70,000.00
106,200.00
134,400.00
282,500.00
55,200.00
31,200.00
52,750.00
318,000.00
3,600.00
6,000.00
798,500.00
9,800.00
14,200.00
6,000.00
19,750.00
14,000.00
54,600.00
93,125.00
56,500.00
61,500.00
4,950.00
11,000.00
15,200.00
20,500.00
22,550.00
21,400.00
20,350.00

Daftar Analisa TARKIM Halaman : 61+1


Satuan Bahan

241,375.00
3,450.00
1,400.00
70,200.00
185,500.00
66,500.00
42,500.00
86,000.00

Daftar Analisa TARKIM Halaman : 62+1


Satuan Bahan

157,000.00
160,000.00
484,350.00
65,000.00
14,150.00
273,500.00
118,200.00
21,150.00
81,250.00
30,300.00
18,150.00
278,000.00
11,000.00
70,000.00
4,500.00
1,750.00
12,000.00
1,741,000.00
105,000.00
8,750.00
100,000.00

204,750.00
23,000.00
61,350.00
618,300.00
64,800.00
192,000.00
88,600.00
102,300.00
40,950.00
26,900.00
170,500.00
10,300.00
87,350.00

Daftar Analisa TARKIM Halaman : 63+1


Satuan Bahan

68,250.00
65,600.00
6,500.00
51,200.00
6,750.00
10,900.00
2,700.00
6,750.00

Daftar Analisa TARKIM Halaman : 64+1


Satuan Bahan

16,350.00
17,500.00
13,650.00
23,800.00
8,850.00
12,200.00
18,300.00
7,400.00
8,850.00
5,450.00
11,500.00
450,000.00
129,600.00
477,750.00
109,200.00
9,500.00
23,900.00
30,700.00
160,000.00

546,000.00
5,100.00
3,650.00
4,875.00
4,875.00
1,500.00
6,375.00
1,550.00
3,000.00

171,000.00
155,700.00
341,250.00
1,149,300.00

Daftar Analisa TARKIM Halaman : 65+1


Satuan Bahan

1,684,400.00
5,812,300.00
6,882,500.00
25,252,500.00
12,332,500.00
211,575,000.00
4,299,750.00

Daftar Analisa TARKIM Halaman : 66+1


Satuan Bahan

450,000.00
700,000.00
1,500,000.00
27,500.00
67,500.00

dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung
dihitung

25,000.00
27,500.00
33,500.00
42,000.00
2,100.00
25,000.00
55,000.00
12,250.00
1,200.00

Daftar Analisa TARKIM Halaman : 67+1


Satuan Bahan

62,000.00

184,275.00
202,600.00
300,000.00
282,000.00

Daftar Analisa TARKIM Halaman : 68+1


Satuan Bahan

258,000.00
307,000.00
178,000.00
307,000.00
430,000.00
2,211,000.00
645,000.00
153,000.00
184,000.00
706,000.00
675,000.00
104,000.00
644,000.00
215,000.00
184,000.00
215,000.00
276,000.00
92,000.00
368,000.00
276,000.00
153,500.00
123,000.00
276,000.00
307,000.00
245,000.00
921,000.00
73,000.00
105,000.00
73,000.00
215,000.00
307,000.00
368,500.00
294,800.00
307,000.00
737,000.00
122,800.00
92,000.00
98,300.00
92,000.00

Daftar Analisa TARKIM Halaman : 69+1


Satuan Bahan

61,400.00
61,400.00
184,300.00

3,250.00
101,650.00
45,000.00
650.00

Daftar Analisa TARKIM Halaman : 70+1


Satuan Bahan

5,500.00
5,850.00
1,050.00
23,800.00
81,900.00
69,550.00
44,300.00
13,650.00
6,750.00
4,875.00
583,450.00

305,000.00
465,800.00
617,650.00
1,781,250.00
2,139,500.00
605,600.00
27,300.00
233,750.00
242,200.00
101,124,000.00
120,601,000.00
54,315,000.00
399,200.00
300,300.00
4,692,000.00
315,650.00
332,600.00
315,600.00
637,105,200.00

Daftar Analisa TARKIM Halaman : 71+1


Satuan Bahan

7,556,145,800.00
4,800,597,000.00
4,275,343,800.00

Daftar Analisa TARKIM Halaman : 72+1


ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : Peningkatan Kualitas Permukiman Kumuh Kws Perikanan,


Kawasan BTN, Jln. Pesantren Kota Sorong
TAHUN ANGGARAN : APBN 2016

PEKERJAAN PERSIAPAN
1 m' Pengukuran dan pemasangan bouwplank
0.0120 M3 Kayu Klas II 5/7 @ Rp 2,100,000.00
0.0200 Kg Paku biasa 2" - 5" @ Rp 18,375.00
0.0070 M 3
Kayu papan 3/20 @ Rp 2,100,000.00
0.1000 Oh Pekerja @ Rp 95,000.00
0.1000 Oh Tukang kayu @ Rp 100,000.00
0.0100 Oh Kepala tukang @ Rp 120,000.00
0.0050 Oh Mandor @ Rp 150,000.00

1 m3 Galian tanah biasa


0.7500 Oh Pekerja @ Rp 95,000.00
0.0250 Oh Mandor @ Rp 150,000.00

1 m3 Galian tanah keras


2.0000 Oh Pekerja @ Rp 95,000.00
0.0330 Oh Mandor @ Rp 150,000.00

1 m3 Urugan Tanah
1.2000 M3 Tanah urug @ Rp 50,000.00
0.2500 OH Pekerja @ Rp 95,000.00
0.0250 OH Mandor @ Rp 150,000.00

1 m3 Urugan kembali
0.5000 Oh Pekerja @ Rp 95,000.00
0.0083 Oh Mandor @ Rp 150,000.00

1 m3 Urugan Sirtu
1.2000 M3 Sirtu @ Rp 203,891.33
0.3000 Oh Pekerja @ Rp 95,000.00
0.0100 Oh Mandor @ Rp 150,000.00

1 m3 Urugan pasir
1.2000 M3 Pasir urug @ Rp 279,532.65
0.3000 Oh Pekerja @ Rp 95,000.00
0.0100 Oh Mandor @ Rp 150,000.00

PEKERJAAN PONDASI
1 m3 Pasang pondasi batu belah, 1 Pc : 4 Ps
1.2000 M3 Batu belah 15/20 cm @ Rp 577,500.00
3.2600 Sak Semen portland @ Rp 99,750.00
0.5200 M3 Pasir pasang @ Rp 236,250.00
1.5000 Oh Pekerja @ Rp 95,000.00
0.6000 Oh Tukang batu @ Rp 100,000.00
0.0600 Oh Kepala tukang @ Rp 120,000.00
0.0750 Oh Mandor @ Rp 150,000.00

1 m3 Pasang pondasi batu Belah, 1 Pc : 3 Ps


1.1000 M3 Batu belah 15/20 cm @ Rp 577,500.00
4.0400 Sak Semen portland @ Rp 99,750.00
0.4850 M3 Pasir pasang @ Rp 236,250.00
1.5000 Oh Pekerja @ Rp 95,000.00
0.6000 Oh Tukang batu @ Rp 100,000.00
0.0600 Oh Kepala tukang @ Rp 120,000.00
0.0750 Oh Mandor @ Rp 150,000.00
1 m3 Pasang pondasi batu kosong'
1.2000 M3 Batu belah 15/20 cm @ Rp 577,500.00
0.3000 M3 Pasir urug @ Rp 279,532.65
0.7800 Oh Pekerja @ Rp 95,000.00
0.3900 Oh Tukang batu @ Rp 100,000.00
0.0390 Oh Kepala tukang @ Rp 120,000.00
0.0390 Oh Mandor @ Rp 150,000.00

PEKERJAAN BETON
1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr
4.3600 Sak Semen portland @ Rp 99,750.00
0.5200 M 3
Pasir beton @ Rp 320,625.00
0.8700 M 3
Koral beton @ Rp 783,750.00
2.0000 Oh Pekerja @ Rp 95,000.00
0.3500 Oh Tukang batu @ Rp 100,000.00
0.0350 Oh Kepala tukang @ Rp 120,000.00
1.0000 Oh Mandor @ Rp 150,000.00

1 m3 Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr


6.7200 Sak Semen portland @ Rp 99,750.00
0.5400 M 3
Pasir beton @ Rp 320,625.00
0.8100 M 3
Koral beton @ Rp 783,750.00
2.0000 Oh Pekerja @ Rp 95,000.00
0.3500 Oh Tukang batu @ Rp 100,000.00
0.0350 Oh Kepala tukang @ Rp 120,000.00
1.0000 Oh Mandor @ Rp 150,000.00

1 Kg Pembesian dengan besi polos


1.1000 Kg Besi beton (polos) @ Rp 15,855.00
0.0150 Kg Kawat beton @ Rp 23,100.00
0.0700 Oh Pekerja @ Rp 95,000.00
0.0350 Oh Tukang besi @ Rp 100,000.00
0.0035 Oh Kepala tukang @ Rp 120,000.00
0.0035 Oh Mandor @ Rp 150,000.00

1 m2 Pasang bekisting untuk pondasi


0.0400 M3 Kayu terentang @ Rp 2,100,000.00
0.3000 Kg Paku biasa 2" - 5" @ Rp 18,375.00
0.1000 Lt Minyak bekisting @ Rp 4,275.00
0.3000 Oh Pekerja @ Rp 95,000.00
0.2600 Oh Tukang kayu @ Rp 100,000.00
0.0260 Oh Kepala tukang @ Rp 120,000.00
0.0050 Oh Mandor @ Rp 150,000.00

1 m2 Pasang bekisting untuk sloof


0.0450 M3 Kayu terentang @ Rp 2,100,000.00
0.3000 Kg Paku biasa 2" - 5" @ Rp 18,375.00
0.1000 Lt Minyak bekisting @ Rp 4,275.00
0.3000 Oh Pekerja @ Rp 95,000.00
0.2600 Oh Tukang kayu @ Rp 100,000.00
0.0260 Oh Kepala tukang @ Rp 120,000.00
0.0050 Oh Mandor @ Rp 150,000.00

1 m2 Pasang bekisting untuk kolom


0.0400 M3 Kayu terentang @ Rp 2,100,000.00
0.4000 Kg Paku biasa 2" - 5" @ Rp 18,375.00
0.2000 Lt Minyak bekisting @ Rp 4,275.00
0.0150 M 3
Balok kayu klas II @ Rp 2,100,000.00
0.0044 M3 Papan Kayu Lombo @ Rp 2,100,000.00
2.0000 Btg Dolken kayu galam Ø 8-10/4m @ Rp 9,975.00
0.3000 Oh Pekerja @ Rp 95,000.00
0.3300 Oh Tukang kayu @ Rp 100,000.00
0.0330 Oh Kepala tukang @ Rp 120,000.00
0.0060 Oh Mandor @ Rp 150,000.00
1 m2 Pasang bekisting untuk balok
0.0400 M3 Kayu terentang @ Rp 2,100,000.00
0.4000 Kg Paku biasa 2" - 5" @ Rp 18,375.00
0.2000 Lt Minyak bekisting @ Rp 4,275.00
0.0180 M 3
Balok kayu klas II @ Rp 2,100,000.00
0.0044 M3 Papan Kayu Lombo @ Rp 2,100,000.00
2.0000 Btg Dolken kayu galam Ø 8-10/4m @ Rp 9,975.00
0.3200 Oh Pekerja @ Rp 95,000.00
0.3300 Oh Tukang kayu @ Rp 100,000.00
0.0330 Oh Kepala tukang @ Rp 120,000.00
0.0060 Oh Mandor @ Rp 150,000.00

1 m2 Pasang bekisting untuk lantai


0.0400 M3 Kayu terentang @ Rp 2,100,000.00
0.4000 Kg Paku biasa 2" - 5" @ Rp 18,375.00
0.2000 Lt Minyak bekisting @ Rp 4,275.00
0.0150 M3 Balok kayu klas II @ Rp 2,100,000.00
0.0044 M3 Papan Kayu Lombo @ Rp 2,100,000.00
6.0000 Btg Dolken kayu galam Ø 8-10/4m @ Rp 9,975.00
0.3200 Oh Pekerja @ Rp 95,000.00
0.3300 Oh Tukang kayu @ Rp 100,000.00
0.0330 Oh Kepala tukang @ Rp 120,000.00
0.0060 Oh Mandor @ Rp 150,000.00

1 M3 PEKERJAAN BETON BERTULANG 1:2:3 lantai Beton


1.0000 M3 Cor Beton 1:2:3 @ Rp 1,857,495.00
123.3000 Kg Besi Beton @ Rp 28,882.00

1 M3 Pekerjaan Beton Bertulang 1:2:3 Plat


1.0000 M3 Cor Beton 1:2:3 @ Rp 1,857,495.00
5.2000 m2 Bekisting Lantai @ Rp 261,055.00
197.2800 Kg Besi Beton @ Rp 28,882.00

1 M3 PEKERJAAN BETON BERTULANG 1:2:3 Sloof 20/35


1.0000 M3 Cor Beton 1:2:3 @ Rp 1,857,495.00
8.0000 m2 Bekisting Sloof @ Rp 158,810.00
131.3321 Kg Besi Beton @ Rp 28,882.00

1 M3 PEKERJAAN BETON BERTULANG 1:2:3 Kolom Praktis 15/15


1.0000 M3 Cor Beton 1:2:3 @ Rp 1,857,495.00
13.3333 m2 Bekisting Kolom @ Rp 219,255.00
134.2600 Kg Besi Beton @ Rp 28,882.00

1 M3 PEKERJAAN BETON BERTULANG 1:2:3 Ring Balok 20/35


1.0000 M3 Cor Beton 1:2:3 @ Rp 1,857,495.00
10.0000 m2 Bekisting Balok @ Rp 227,455.00
146.5509 Kg Besi Beton @ Rp 28,882.00

PEKERJAAN DINDING BATA DAN PLESTERAN


1 M3 PASANGAN DINDING BATA 1:4
30.0000 BH Batako @ Rp 1,365.00
0.2650 M3 Pasir @ Rp 236,250.00
1.8800 Sak Pc @ Rp 99,750.00
3.1500 OH Pekerja @ Rp 95,000.00
0.1575 OH Mandor @ Rp 150,000.00
1.0000 OH Tukang @ Rp 100,000.00
0.1000 OH Kep Tukang @ Rp 120,000.00

1 M3 PASANGAN DINDING BATA 1:3


300.0000 BH Batako @ Rp 1,365.00
0.2490 M3 Pasir @ Rp 236,250.00
2.0030 Sak Pc @ Rp 99,750.00
3.1500 OH Pekerja @ Rp 95,000.00
0.1570 OH Mandor @ Rp 150,000.00
1.0500 OH Tukang @ Rp 100,000.00
0.1050 OH Kep Tukang @ Rp 120,000.00

1 M2 Pasangan Bata Merah 1/2 BATA, 1Pc :4Ps


35.0000 Bh Batu Bataco @ Rp 1,365.00
0.0215 M3 Pasir @ Rp 236,250.00
0.1150 Sak Semen @ Rp 99,750.00
0.1600 Oh Pekerja @ Rp 95,000.00
0.0500 Oh Tukang @ Rp 150,000.00
0.0050 Oh Kep. Tukang @ Rp 100,000.00
0.0075 Oh Mandor @ Rp 120,000.00

1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm


0.1040 Sak Semen portland @ Rp 99,750.00
0.0200 M 3
Pasir plester @ Rp 236,250.00
0.2000 Oh Pekerja @ Rp 95,000.00
0.1500 Oh Tukang batu @ Rp 100,000.00
0.0150 Oh Kepala tukang @ Rp 120,000.00
0.0100 Oh Mandor @ Rp 150,000.00
1 M2 Acian Dinding
0.0150 Sak Portland Cement (pc) @ Rp 99,750.00
0.0125 OH Mandor @ Rp 150,000.00
0.0094 OH Kepala Tukang @ Rp 120,000.00
0.0625 OH Pekerja @ Rp 95,000.00
0.0938 OH Tukang @ Rp 100,000.00

1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm


0.1704 Sak Semen portland @ Rp 99,750.00
0.0170 M3 Pasir pasang @ Rp 236,250.00
0.2000 Oh Pekerja @ Rp 95,000.00
0.1500 Oh Tukang batu @ Rp 100,000.00
0.0150 Oh Kepala tukang @ Rp 120,000.00
0.0100 Oh Mandor @ Rp 150,000.00

PEKERJAAN KERAMIK
1 m2 Lantai Keramik warna uk. 40x40, Anti Slip
1.0000 M2 Keramik warna 40 x 40 cm @ Rp 89,250.00
0.2276 Sak Semen portland @ Rp 99,750.00
0.0420 M 3
Pasir pasang @ Rp 236,250.00
1.5000 Kg Semen warna @ Rp 8,550.00
0.6200 Oh Pekerja @ Rp 95,000.00
0.3500 Oh Tukang batu @ Rp 100,000.00
0.0350 Oh Kepala tukang @ Rp 120,000.00
0.0300 Oh Mandor @ Rp 150,000.00

1 m2 Lantai Keramik warna uk. 40x40 cm


1.0000 M2 Keramik warna 40 x 40 cm @ Rp 89,250.00
0.2276 Sak Semen portland @ Rp 99,750.00
0.0420 M 3
Pasir pasang @ Rp 236,250.00
1.5000 Kg Semen warna @ Rp 8,550.00
0.6200 Oh Pekerja @ Rp 95,000.00
0.3500 Oh Tukang batu @ Rp 100,000.00
0.0350 Oh Kepala tukang @ Rp 120,000.00
0.0300 Oh Mandor @ Rp 150,000.00

1 m2 Dinding Keramik warna uk. 40x40 cm


1.0000 M2 Keramik warna 40 x 40 cm @ Rp 89,250.00
0.1860 Kg Semen portland @ Rp 99,750.00
0.0180 M 3
Pasir plester @ Rp 236,250.00
1.5000 Kg Semen warna @ Rp 8,550.00
0.6000 Oh Pekerja @ Rp 95,000.00
0.4500 Oh Tukang batu @ Rp 100,000.00
0.0450 Oh Kepala tukang @ Rp 120,000.00
0.0300 Oh Mandor @ Rp 150,000.00

1 m2 Lantai Keramik warna uk. 30x30 cm


1.0000 M2 Keramik warna 30 x 30 cm @ Rp 72,450.00
0.2276 Sak Semen portland @ Rp 99,750.00
0.0420 M3 Pasir pasang @ Rp 236,250.00
1.5000 Kg Semen warna @ Rp 8,550.00
0.6200 Oh Pekerja @ Rp 95,000.00
0.3500 Oh Tukang batu @ Rp 100,000.00
0.0350 Oh Kepala tukang @ Rp 120,000.00
0.0300 Oh Mandor @ Rp 150,000.00

1 m2 Lantai keramik warna km/wc uk. 20x20 cm


1.0000 M2 Keramik warna 20 x 20 cm @ Rp 92,625.00
0.2276 Sak Semen portland @ Rp 99,750.00
0.0420 M3 Pasir pasang @ Rp 236,250.00
1.5000 Kg Semen warna @ Rp 8,550.00
0.6200 Oh Pekerja @ Rp 95,000.00
0.3500 Oh Tukang batu @ Rp 100,000.00
0.0350 Oh Kepala tukang @ Rp 120,000.00
0.0300 Oh Mandor @ Rp 150,000.00
1 m2 Dinding keramik warna km/wc uk. 20x30 cm
1.0000 M2 Keramik warna 20 x 30 cm @ Rp 96,900.00
0.2276 Sak Semen portland @ Rp 99,750.00
0.0420 M 3
Pasir plester @ Rp 236,250.00
1.5000 Kg Semen warna @ Rp 8,550.00
0.6200 Oh Pekerja @ Rp 95,000.00
0.3500 Oh Tukang batu @ Rp 100,000.00
0.0350 Oh Kepala tukang @ Rp 120,000.00
0.0300 Oh Mandor @ Rp 150,000.00

PEKERJAAN KUDA-KUDA DAN ATAP


1 m3 Pasang konstruksi kuda-kuda kayu klas I
1.1000 M3 Kayu, balok @ Rp 3,675,000.00
1.0000 Kg Besi strip @ Rp 17,850.00
0.8000 Kg Paku biasa 2" - 5" @ Rp 18,375.00
4.0000 Oh Pekerja @ Rp 95,000.00
12.0000 Oh Tukang kayu @ Rp 100,000.00
1.2000 Oh Kepala tukang @ Rp 120,000.00
0.2000 Oh Mandor @ Rp 150,000.00

1 Kg Pasang Rangka Atap Baja WF 250x125


1.1000 Kg Baja WF 250x125 @ Rp 22,800.00
0.0700 Oh Pekerja @ Rp 95,000.00
0.0350 Oh Tukang besi @ Rp 100,000.00
0.0035 Oh Kepala tukang @ Rp 120,000.00
0.0035 Oh Mandor @ Rp 150,000.00

1 m2 Pasang kaso + reng genteng Kayu Klas I


0.0127 M3 Kayu, balok @ Rp 3,675,000.000
0.1500 Kg Paku biasa 2" - 5" @ Rp 18,375.000
0.0880 Oh Pekerja @ Rp 95,000.000
0.2640 Oh Tukang kayu @ Rp 100,000.000
0.0264 Oh Kepala tukang @ Rp 120,000.000
0.0044 Oh Mandor @ Rp 150,000.000
1 m2 Pasang atap genteng metal
1.6200 Bh Genteng metal @ Rp 54,600.000
0.2000 Kg Paku genteng @ Rp 21,000.000
0.2000 Oh Pekerja @ Rp 95,000.000
0.1000 Oh Tukang kayu @ Rp 100,000.000
0.0100 Oh Kepala tukang @ Rp 120,000.000
0.0010 Oh Mandor @ Rp 150,000.000

1 m' Pasang nok lengkung genteng metal


1.1000 Bh Nok Genteng Metal @ Rp 31,500.000
0.0500 Kg Paku Genteng @ Rp 21,000.000
0.2500 Oh Pekerja @ Rp 95,000.000
0.1500 Oh Tukang kayu @ Rp 100,000.000
0.0150 Oh Kepala tukang @ Rp 120,000.000
0.0130 Oh Mandor @ Rp 150,000.000

1 m2 Pasang Atap Seng Gelombang BJL 30


0.8500 Lbr Seng Gelombang @ Rp 99,750.000
0.0250 Kg Paku Seng @ Rp 21,000.000
0.1000 Oh Pekerja @ Rp 95,000.000
0.2000 Oh Tukang kayu @ Rp 100,000.000
0.0200 Oh Kepala tukang @ Rp 120,000.000
0.0050 Oh Mandor @ Rp 150,000.000

10 m' Pasang Nok/Bubungan Seng Plat BJL 30


6.6600 Lbr Seng Plat @ Rp 36,750.000
0.1000 Kg Paku Seng @ Rp 21,000.000
0.1000 M3 Papan Alas Talang @ Rp 3,675,000.000
0.3500 Oh Pekerja @ Rp 95,000.000
0.6000 Oh Tukang kayu @ Rp 100,000.000
0.0600 Oh Kepala tukang @ Rp 120,000.000
0.0175 Oh Mandor @ Rp 150,000.000
10 m'
1 m'
1 M3 GORDING KAYU BESI
1.1000 M3 Kayu besi @ Rp 3,675,000.00
2.0000 kg Paku biasa @ Rp 18,375.00
4.0000 OH Pekerja @ Rp 95,000.00
0.2000 OH Mandor @ Rp 150,000.00
0.7500 OH Tukang @ Rp 100,000.00
0.0750 OH Kep Tukang @ Rp 120,000.00

1 m' Pasang lisplank Papan kayu klas I


0.0160 M3 Kayu, papan @ Rp 3,675,000.00
0.0600 Kg Paku biasa 2" - 5" @ Rp 18,375.00
0.1500 Oh Pekerja @ Rp 95,000.00
0.2500 Oh Tukang kayu @ Rp 100,000.00
0.0250 Oh Kepala tukang @ Rp 120,000.00
0.0750 Oh Mandor @ Rp 150,000.00

PEKERJAAN KUSEN PINTU,JENDELA DAN KACA


1 m3 Pasang kusen pintu dan jendela kayu klas I
1.1000 M3 Kayu klas I @ Rp 3,675,000.00
6.0000 Oh Pekerja @ Rp 95,000.00
20.0000 Oh Tukang kayu @ Rp 100,000.00
2.0000 Oh Kepala tukang @ Rp 120,000.00
0.3000 Oh Mandor @ Rp 150,000.00

1 M2 Pasang bingkai Jendela Kaca Kayu Klas 1


0.0350 M3 Papan @ Rp 3,675,000.00
0.8000 OH Pekerja @ Rp 95,000.00
0.0400 OH Mandor @ Rp 150,000.00
2.0000 OH Tukang @ Rp 100,000.00
0.2000 OH Kep Tukang @ Rp 120,000.00
1 m2 Pasang pintu panel (Kayu klas I)
0.0662 M3 Kayu (papan) @ Rp 3,675,000.00
1.5000 Oh Pekerja @ Rp 95,000.00
5.0000 Oh Tukang kayu @ Rp 100,000.00
0.5000 Oh Kepala tukang @ Rp 120,000.00
0.0750 Oh Mandor @ Rp 150,000.00

1 m2 Pasang Jalusi mati kayu klas I


0.0240 M3 Papan kayu klas I @ Rp 3,675,000.00
0.1500 Kg Paku @ Rp 18,375.00
0.5000 OH Pekerja @ Rp 95,000.00
0.1000 OH Mandor @ Rp 150,000.00
2.0000 OH Tukang @ Rp 100,000.00
0.2000 OH Kep Tukang @ Rp 120,000.00

1 m2 Pintu KM/WC double teakwood lapis Aluminium + Rangka


0.0196 M3 Kayu @ Rp 3,675,000.00
1.0000 Lbr Teakwood @ Rp 110,250.00
1.1111 Lbr Seng plat BJLS 20 @ Rp 36,750.00
0.3000 Kg Paku @ Rp 18,375.00
0.6000 OH Pekerja @ Rp 95,000.00
0.0300 OH Mandor @ Rp 150,000.00
2.0000 OH Tukang @ Rp 100,000.00
0.2000 OH Kep Tukang @ Rp 120,000.00

1 m2 Pasang pintu panel (Kayu klas I) Lapis Seng Plat


0.0662 M3 Kayu (papan) @ Rp 3,675,000.00
0.3500 Lbr Seng Plat @ Rp 36,750.00
1.5000 Oh Pekerja @ Rp 95,000.00
2.0000 Oh Tukang kayu @ Rp 100,000.00
0.2000 Oh Kepala tukang @ Rp 120,000.00
0.0750 Oh Mandor @ Rp 150,000.00

1 m2 Pasang kaca Ryben, tebal 5 mm


1.1000 M2 Kaca ryben 5 mm @ Rp 210,000.00
0.4000 Oh Pekerja @ Rp 95,000.00
0.2400 Oh Tukang kayu @ Rp 100,000.00
0.0240 Oh Kepala tukang @ Rp 120,000.00
0.0200 Oh Mandor @ Rp 150,000.00

1 m2 Pasang kaca bening, tebal 3 mm


1.1000 M2 Kaca bening 3 mm @ Rp 115,500.00
0.4000 Oh Pekerja @ Rp 95,000.00
0.2400 Oh Tukang kayu @ Rp 100,000.00
0.0240 Oh Kepala tukang @ Rp 120,000.00
0.0200 Oh Mandor @ Rp 150,000.00

PEKERJAAN ALAT GANTUNG DAN AKSESORIS


1 bh Pasang kunci tanam 2 Slag
1.0000 Bh Kunci tanam 2 slag @ Rp 162,750.00
0.0100 Oh Pekerja @ Rp 95,000.00
0.5000 Oh Tukang kayu @ Rp 100,000.00
0.0100 Oh Kepala tukang @ Rp 120,000.00
0.0050 Oh Mandor @ Rp 150,000.00

1 bh Pasang engsel pintu


1.0000 Bh Engsel pintu @ Rp 31,500.00
0.0150 Oh Pekerja @ Rp 95,000.00
0.1500 Oh Tukang kayu @ Rp 100,000.00
0.0150 Oh Kepala tukang @ Rp 120,000.00
0.0008 Oh Mandor @ Rp 150,000.00

1 bh Pasang engsel jendela kupu-kupu


1.0000 Bh Engsel jendela @ Rp 5,250.00
0.0100 Oh Pekerja @ Rp 95,000.00
0.1000 Oh Tukang kayu @ Rp 100,000.00
0.0100 Oh Kepala tukang @ Rp 120,000.00
0.0005 Oh Mandor @ Rp 150,000.00

1 bh Pasang kait angin


1.0000 Bh Kait angin @ Rp 10,500.00
0.0150 Oh Pekerja @ Rp 95,000.00
0.1500 Oh Tukang kayu @ Rp 100,000.00
0.0150 Oh Kepala tukang @ Rp 120,000.00
0.0008 Oh Mandor @ Rp 150,000.00

1 bh Pasang pegangan pintu / door holder


1.0000 Bh Door holder @ Rp 0.00
0.0500 Oh Pekerja @ Rp 95,000.00
0.5000 Oh Tukang kayu @ Rp 100,000.00
0.0500 Oh Kepala tukang @ Rp 120,000.00
0.0025 Oh Mandor @ Rp 150,000.00

1 BUAH PASANG TARIKAN JENDELA


1.0000 BH Tarikan jendela @ Rp 7,000.00
0.0120 OH Pekerja @ Rp 95,000.00
0.0010 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00

1 Bh Pasang Grendel Pintu


1.0000 BH Grendel Pintu @ Rp 63,000.00
0.0120 OH Pekerja @ Rp 95,000.00
0.0010 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00
1 Bh Pasang Grendel Jendela
1.0000 BH Grendel Jendela @ Rp 15,750.00
0.0120 OH Pekerja @ Rp 95,000.00
0.0010 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00

PEKERJAAN PLAFOND
1 M' Rangka Plafond Holow 40.40
1.1000 M' Holow 40.40 @ Rp 35,000.00
0.2200 kg Paku @ Rp 18,375.00
0.1875 Oh Perkerja @ Rp 95,000.00
0.2250 Oh Tukang Kayu @ Rp 100,000.00
0.0375 Oh Kepala Tukang @ Rp 120,000.00
0.0105 Oh Mandor @ Rp 150,000.00

1 m² Langit - langit Plywood ( 30 x 60 )cm, tebal 4 mm


0.3600 lbr Plywood 4 mm @ Rp 94,500.00
0.0300 Kg Paku @ Rp 18,375.00
0.0700 Oh Perkerja @ Rp 95,000.00
0.1000 Oh Tukang Kayu @ Rp 100,000.00
0.0100 Oh Kepala Tukang @ Rp 120,000.00
0.0035 Oh Mandor @ Rp 150,000.00

1 m' Pasang list plafond kayu profil


1.1000 M' List kayu profil @ Rp 10,000.00
0.0100 Kg Paku @ Rp 28,500.00
0.0500 Oh Pekerja @ Rp 95,000.00
0.0500 Oh Tukang kayu @ Rp 150,000.00
0.0050 Oh Kepala tukang @ Rp 100,000.00
0.0030 Oh Mandor @ Rp 120,000.00

1 m' List langit-langit papan profil 2/20


0.0044 m3 List papan profil @ Rp 3,675,000.000
0.0200 Kg Paku @ Rp 28,500.000
0.1500 Oh Pekerja @ Rp 95,000.000
0.2500 Oh Tukang kayu @ Rp 100,000.000
0.0250 Oh Kepala tukang @ Rp 120,000.000
0.0750 Oh Mandor @ Rp 150,000.000

PEKERJAAN PENGECATAN
1 m2 Pengecatan tembok baru ( 1 lapis cat dasar,
2 lapis cat penutup)
0.1000 Kg Cat dasar @ Rp 16,800.00
0.2600 Kg Cat penutup 2 x @ Rp 16,800.00
0.0750 Oh Pekerja @ Rp 95,000.00
0.2500 Oh Tukang cat @ Rp 100,000.00
0.0250 Oh Kepala tukang @ Rp 120,000.00
0.0038 Oh Mandor @ Rp 150,000.00

1 m2 Pelaburan bidang kayu dengan politur


0.1500 Kg Dempul Kayu @ Rp 23,100.00
0.3720 Kg Politur @ Rp 47,250.00
1.0000 bks Pewarna @ Rp 5,000.00
2.0000 Lbr Ampelas @ Rp 3,675.00
0.2500 Oh Tukang cat @ Rp 100,000.00
0.0250 Oh Kepala tukang @ Rp 120,000.00
0.0025 Oh Mandor @ Rp 150,000.00
1 m2 Pengecatan tembok baru anti lumut ( 1 lapis plamir, 1 lapis cat dasar,
2 lapis cat penutup )
0.1000 Kg Plamur @ Rp 10,500.00
0.1000 Kg Cat dasar @ Rp 16,800.00
0.2600 Kg Cat penutup 2 x @ Rp 16,800.00
0.0750 Oh Pekerja @ Rp 95,000.00
0.2500 Oh Tukang cat @ Rp 100,000.00
0.0250 Oh Kepala tukang @ Rp 120,000.00
0.0038 Oh Mandor @ Rp 150,000.00
1 m2 Pengecatan plafon baru (1 lapis cat dasar, 2 lapis cat penutup )
0.1000 Kg Cat dasar @ Rp 16,800.00
0.2600 Kg Cat penutup 2 x @ Rp 16,800.00
0.0750 Oh Pekerja @ Rp 95,000.00
0.2500 Oh Tukang cat @ Rp 100,000.00
0.0250 Oh Kepala tukang @ Rp 120,000.00
0.0038 Oh Mandor @ Rp 150,000.00

1 m2 Pengecetan bidang kayu baru (1 lapis cat dasar,


3 lapis cat penutup)
0.2000 Kg Cat meni @ Rp 23,100.00
0.1500 Kg Dempul Kayu @ Rp 23,100.00
0.1700 Kg Cat dasar @ Rp 16,800.00
0.3500 Kg Cat penutup 3 kali @ Rp 16,800.00
0.0750 Oh Pekerja @ Rp 95,000.00
0.2500 Oh Tukang cat @ Rp 100,000.00
0.0250 Oh Kepala tukang @ Rp 120,000.00
0.0025 Oh Mandor @ Rp 150,000.00

PEKERJAAN SANITAIR
1 bh Memasang kloset duduk/monoblok
1.0000 Bh Kloset duduk monoblok @ Rp 1,785,000.00
1.0000 Perlengkapan (6% x harga kloset) @ Rp 107,100.00
3.3000 Oh Pekerja @ Rp 95,000.00
1.1000 Oh Tukang @ Rp 100,000.00
0.0010 Oh Kepala tukang @ Rp 120,000.00
0.1600 Oh Mandor @ Rp 150,000.00

1 bh Memasang kloset jongkok


1.0000 Bh Kloset jongkok @ Rp 682,500.00
0.6000 Sak Semen portland @ Rp 99,750.00
0.0100 M 3
Pasir pasang @ Rp 236,250.00
1.0000 Oh Pekerja @ Rp 95,000.00
1.5000 Oh Tukang @ Rp 100,000.00
1.5000 Oh Kepala tukang @ Rp 120,000.00
0.1600 Oh Mandor @ Rp 150,000.00
1 m' Memasang pipa galvanis, Ø 2"
1.2000 M1 Pipa galvanis Ø 2" @ Rp 78,750.00
1.0000 Perlengkapan (35% harga pipa) @ Rp 27,562.50
0.1080 Oh Pekerja @ Rp 95,000.00
0.1800 Oh Tukang @ Rp 100,000.00
0.0180 Oh Kepala tukang @ Rp 120,000.00
0.0054 Oh Mandor @ Rp 150,000.00

1 m' Memasang pipa galvanis, Ø 1½"


1.2000 M1 Pipa galvanis Ø 1½" @ Rp 65,000.00
1.0000 Perlengkapan (35% harga pipa) @ Rp 22,750.00
0.1080 Oh Pekerja @ Rp 95,000.00
0.1800 Oh Tukang @ Rp 100,000.00
0.0180 Oh Kepala tukang @ Rp 120,000.00
0.0054 Oh Mandor @ Rp 150,000.00

1 m' Memasang pipa galvanis, Ø 1"


1.2000 M1 Pipa galvanis Ø 1" @ Rp 45,000.00
1.0000 Perlengkapan (35% harga pipa) @ Rp 15,750.00
0.0540 Oh Pekerja @ Rp 95,000.00
0.0900 Oh Tukang @ Rp 100,000.00
0.0090 Oh Kepala tukang @ Rp 120,000.00
0.0270 Oh Mandor @ Rp 150,000.00

1 m' Memasang pipa galvanis, Ø 3/4"


1.2000 M1 Pipa galvanis Ø 3/4" @ Rp 35,000.00
1.0000 Perlengkapan (35% harga pipa) @ Rp 12,250.00
0.0540 Oh Pekerja @ Rp 95,000.00
0.0900 Oh Tukang @ Rp 100,000.00
0.0090 Oh Kepala tukang @ Rp 120,000.00
0.0270 Oh Mandor @ Rp 150,000.00

1 m' Memasang pipa galvanis, Ø ½"


1.2000 M1 Pipa galvanis Ø ½" @ Rp 29,000.00
1.0000 Perlengkapan (35% harga pipa) @ Rp 10,150.00
0.0540 Oh Pekerja @ Rp 95,000.00
0.0900 Oh Tukang @ Rp 100,000.00
0.0090 Oh Kepala tukang @ Rp 120,000.00
0.0270 Oh Mandor @ Rp 150,000.00

1 m' Memasang pipa PVC tipe AW , Ø2"


0.3000 btg Pipa PVC tipe AW Ø 2" @ Rp 55,000.00
1.0000 Perlengkapan (35% harga pipa) @ Rp 5,775.00
0.0540 Oh Pekerja @ Rp 95,000.00
0.0900 Oh Tukang @ Rp 100,000.00
0.0090 Oh Kepala tukang @ Rp 120,000.00
0.0027 Oh Mandor @ Rp 150,000.00

1 m' Memasang pipa PVC tipe AW , Ø 3"


0.3000 btg Pipa PVC tipe AW Ø 3" @ Rp 65,000.00
1.0000 Perlengkapan (35% harga pipa) @ Rp 6,825.00
0.0540 Oh Pekerja @ Rp 95,000.00
0.0900 Oh Tukang @ Rp 100,000.00
0.0090 Oh Kepala tukang @ Rp 120,000.00
0.0027 Oh Mandor @ Rp 150,000.00

1 m' Memasang pipa PVC tipe AW , Ø 3/4"


0.3000 btg Pipa PVC tipe AW Ø 3/4" @ Rp 35,000.00
1.0000 Perlengkapan (35% harga pipa) @ Rp 3,675.00
0.0540 Oh Pekerja @ Rp 95,000.00
0.0900 Oh Tukang @ Rp 100,000.00
0.0090 Oh Kepala tukang @ Rp 120,000.00
0.0027 Oh Mandor @ Rp 150,000.00

1 m' Memasang pipa PVC tipe AW , Ø 4"


0.3000 btg Pipa PVC tipe AW Ø 4" @ Rp 250,000.00
1.0000 Perlengkapan (35% harga pipa) @ Rp 26,250.00
0.0810 Oh Pekerja @ Rp 95,000.00
0.1350 Oh Tukang @ Rp 100,000.00
0.0135 Oh Kepala tukang @ Rp 120,000.00
0.0041 Oh Mandor @ Rp 150,000.00

1 bh Memasang Stop Kran Ø ½"


1.0000 Bh Kran air @ Rp 10,500.00
0.0250 Bh Seal tape @ Rp 5,000.00
0.0100 Oh Pekerja @ Rp 95,000.00
0.1000 Oh Tukang @ Rp 100,000.00
0.0100 Oh Kepala tukang @ Rp 120,000.00
0.0050 Oh Mandor @ Rp 150,000.00

1 bh Memasang Stop Kran ¾"


1.0000 Bh Kran air @ Rp 45,000.00
0.0250 Bh Seal tape @ Rp 5,000.00
0.0100 Oh Pekerja @ Rp 95,000.00
0.1000 Oh Tukang @ Rp 100,000.00
0.0100 Oh Kepala tukang @ Rp 120,000.00
0.0050 Oh Mandor @ Rp 150,000.00

1 bh Memasang floor drain


1.0000 Bh Floor drain @ Rp 40,000.00
0.0100 Oh Pekerja @ Rp 95,000.00
0.1000 Oh Tukang @ Rp 100,000.00
0.0100 Oh Kepala tukang @ Rp 120,000.00
0.0050 Oh Mandor @ Rp 150,000.00
Pekerjaan Septick Tank uk.2m x 12m x 2m
48.0000 m3 Galian @ Rp 75,000.00
68.4000 m2 Pasangan Batu bata @ Rp 88,425.63
1.0600 m3 Pasir Urug @ Rp 157,500.00
0.8000 m3 Urugan Tanah Kembali @ Rp 48,737.50
82.0800 m2 Plester transram @ Rp 58,313.65
2.6400 m3 Plat Beton @ Rp 8,912,821.96
6.0000 m pipa PVC 4" @ Rp 250,000.00
2.0000 m Pipa penguapan @ Rp 250,000.00
2.0000 m Elbow 4" @ Rp 28,000.00
1.0000 bh Tee Sock 2" @ Rp 17,500.00
Resapan
5.0000 Ijuk @ Rp 7,000.00
0.8600 m3 Batu pecah 2/3 @ Rp 577,500.00
0.8500 m3 Batu pecah 3/5 @ Rp 577,500.00
4.0000 m3 Pipa PVC 4" @ Rp 250,000.00

Pekerjaan Septicktank Per Meter


PEKERJAAN LISTRIK
1 BUAH BOX SEKRING
1.0000 BH Box Limit @ Rp 85,000.00
1.0000 BH Box Sekring Otomat 4 Group @ Rp 103,416.50
2.0000 OH Pekerja @ Rp 95,000.00
0.1000 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00

1 M, MEMASANG INSTALASI LISTRIK INBOW/OUTBOW


0.0100 Rol ' Kawat NYM 3 X 2,5 mm @ Rp 548,625.00
0.2500 Ujg Pipa PVC 1/2 " @ Rp 20,000.00
0.0625 Lot Klem PVC 1/2 " @ Rp 12,000.00
0.5000 Bh T. Dos PVC 1/2 " @ Rp 8,500.00
0.2500 Bh Bok PVC 1/2 " @ Rp 5,000.00
0.2500 Bh Isolatip @ Rp 11,400.00
0.1000 OH Pekerja @ Rp 95,000.00
0.0050 OH Mandor @ Rp 150,000.00
0.1875 OH Tukang Listrik @ Rp 100,000.00
0.0188 OH Kepala Tukang @ Rp 120,000.00

1 BUAH PASANG SAKLAR TUNGGAL


1.0000 BH Saklar tunggal @ Rp 18,375.00
0.0120 OH Pekerja @ Rp 95,000.00
0.0010 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00

1 BUAH PASANG SAKLAR GANDA


1.0000 BH Saklar ganda @ Rp 23,625.00
0.0120 OH Pekerja @ Rp 95,000.00
0.0010 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00

1 BUAH STOP KONTAK 200 watt


1.0000 BH Stop Kontak tunggal @ Rp 28,875.00
0.0120 OH Pekerja @ Rp 95,000.00
0.0010 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00

1 BUAH STOP KONTAK AC


1.0000 BH Stop Kontak AC @ Rp 26,250.00
0.0120 OH Pekerja @ Rp 95,000.00
0.0010 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00
1 BUAH PASANG LAMPU PIJAR 40 Watt
1.0000 BH Lampu pijar 40 Watt @ Rp 4,200.00
0.0250 OH Pekerja @ Rp 95,000.00
0.0100 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00

1 BUAH PASANG LAMPU SL Down Light -18 Watt


1.0000 BH Lampu SL-18 Watt @ Rp 42,000.00
0.0250 OH Pekerja @ Rp 95,000.00
0.0100 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00

1 BUAH PASANG LAMPU SL Down Light -14 Watt, Tanam


1.0000 BH Lampu SL-14 Watt @ Rp 36,750.00
0.0250 OH Pekerja @ Rp 95,000.00
0.0100 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00

1 BUAH PASANG LAMPU SL-23 Watt Tempel


1.0000 BH Lampu SL-23 Watt @ Rp 52,500.00
0.0250 OH Pekerja @ Rp 95,000.00
0.0100 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00

1 BUAH PASANG LAMPU TL 1 x 40 W


1.0000 BH Lampu TL 1 X 40 W @ Rp 36,750.00
0.0250 OH Pekerja @ Rp 47,250.00
0.0100 OH Mandor @ Rp 150,000.00
0.0300 OH Tukang @ Rp 100,000.00
0.0030 OH Kep Tukang @ Rp 120,000.00
NALISA HARGA SATUAN PEKERJAAN

ningkatan Kualitas Permukiman Kumuh Kws Perikanan,

Rp 25,200.00
Rp 367.50
Rp 14,700.00
Rp 9,500.00
Rp 10,000.00
Rp 1,200.00
Rp 750.00
Rp 61,717.50

Rp 71,250.00
Rp 3,750.00
Rp 75,000.00

Rp 190,000.00
Rp 4,950.00
Rp 194,950.00

Rp 60,000.00
Rp 23,750.00
Rp 3,750.00
Rp 87,500.00

Rp 47,500.00
Rp 1,237.50
Rp 48,737.50

Rp 244,669.59
Rp 28,500.00
Rp 1,500.00
Rp 274,669.59

Rp 335,439.19
Rp 28,500.00
Rp 1,500.00
Rp 365,439.19

Rp 693,000.00
Rp 325,185.00
Rp 122,850.00
Rp 142,500.00
Rp 60,000.00
Rp 7,200.00
Rp 11,250.00
Rp 1,361,985.00

Rp 635,250.00
Rp 402,990.00
Rp 114,581.25
Rp 142,500.00
Rp 60,000.00
Rp 7,200.00
Rp 11,250.00
Rp 1,373,771.25
Rp 693,000.00
Rp 83,859.80
Rp 74,100.00
Rp 39,000.00
Rp 4,680.00
Rp 5,850.00
Rp 900,489.80

Rp 434,910.00
Rp 166,725.00
Rp 681,862.50
Rp 190,000.00
Rp 35,000.00
Rp 4,200.00
Rp 150,000.00
Rp 1,662,697.50

Rp 670,320.00
Rp 173,137.50
Rp 634,837.50
Rp 190,000.00
Rp 35,000.00
Rp 4,200.00
Rp 150,000.00
Rp 1,857,495.00

Rp 17,440.50
Rp 346.50
Rp 6,650.00
Rp 3,500.00
Rp 420.00
Rp 525.00
Rp 28,882.00

Rp 84,000.00
Rp 5,512.50
Rp 427.50
Rp 28,500.00
Rp 26,000.00
Rp 3,120.00
Rp 750.00
Rp 148,310.00

Rp 94,500.00
Rp 5,512.50
Rp 427.50
Rp 28,500.00
Rp 26,000.00
Rp 3,120.00
Rp 750.00
Rp 158,810.00

Rp 84,000.00
Rp 7,350.00
Rp 855.00
Rp 31,500.00
Rp 9,240.00
Rp 19,950.00
Rp 28,500.00
Rp 33,000.00
Rp 3,960.00
Rp 900.00
Rp 219,255.00
Rp 84,000.00
Rp 7,350.00
Rp 855.00
Rp 37,800.00
Rp 9,240.00
Rp 19,950.00
Rp 30,400.00
Rp 33,000.00
Rp 3,960.00
Rp 900.00
Rp 227,455.00

Rp 84,000.00
Rp 7,350.00
Rp 855.00
Rp 31,500.00
Rp 9,240.00
Rp 59,850.00
Rp 30,400.00
Rp 33,000.00
Rp 3,960.00
Rp 900.00
Rp 261,055.00

Rp 1,857,495.00
Rp 3,561,150.60
Rp 5,418,645.60

Rp 1,857,495.00
Rp 1,357,486.00
Rp 5,697,840.96
Rp 8,912,821.96

Rp 1,857,495.00
Rp 1,270,480.00
Rp 3,793,134.12
Rp 6,921,109.12

Rp 1,857,495.00
Rp 2,923,400.00
Rp 3,877,697.32
Rp 8,658,592.32

Rp 1,857,495.00
Rp 2,274,550.00
Rp 4,232,681.86
Rp 8,364,726.86

Rp 40,950.00
Rp 62,606.25
Rp 187,530.00
Rp 299,250.00
Rp 23,625.00
Rp 100,000.00
Rp 12,000.00
Rp 725,961.25
Rp 409,500.00
Rp 58,826.25
Rp 199,799.25
Rp 299,250.00
Rp 23,550.00
Rp 105,000.00
Rp 12,600.00
Rp 1,108,525.50

Rp 47,775.00
Rp 5,079.38
Rp 11,471.25
Rp 15,200.00
Rp 7,500.00
Rp 500.00
Rp 900.00
Rp 88,425.63

Rp 10,374.00
Rp 4,725.00
Rp 19,000.00
Rp 15,000.00
Rp 1,800.00
Rp 1,500.00
Rp 52,399.00
Rp 1,496.25
Rp 1,875.00
Rp 1,125.00
Rp 5,937.50
Rp 9,375.00
Rp 19,808.75

Rp 16,997.40
Rp 4,016.25
Rp 19,000.00
Rp 15,000.00
Rp 1,800.00
Rp 1,500.00
Rp 58,313.65

Rp 89,250.00
Rp 22,703.10
Rp 9,922.50
Rp 12,825.00
Rp 58,900.00
Rp 35,000.00
Rp 4,200.00
Rp 4,500.00
Rp 237,300.60

Rp 89,250.00
Rp 22,703.10
Rp 9,922.50
Rp 12,825.00
Rp 58,900.00
Rp 35,000.00
Rp 4,200.00
Rp 4,500.00
Rp 237,300.60

Rp 89,250.00
Rp 18,553.50
Rp 4,252.50
Rp 12,825.00
Rp 57,000.00
Rp 45,000.00
Rp 5,400.00
Rp 4,500.00
Rp 236,781.00

Rp 72,450.00
Rp 22,703.10
Rp 9,922.50
Rp 12,825.00
Rp 58,900.00
Rp 35,000.00
Rp 4,200.00
Rp 4,500.00
Rp 220,500.60
Rp 92,625.00
Rp 22,703.10
Rp 9,922.50
Rp 12,825.00
Rp 58,900.00
Rp 35,000.00
Rp 4,200.00
Rp 4,500.00
Rp 240,675.60
Rp 96,900.00
Rp 22,703.10
Rp 9,922.50
Rp 12,825.00
Rp 58,900.00
Rp 35,000.00
Rp 4,200.00
Rp 4,500.00
Rp 244,950.60

Rp 4,042,500.00
Rp 17,850.00
Rp 14,700.00
Rp 380,000.00
Rp 1,200,000.00
Rp 144,000.00
Rp 30,000.00
Rp 5,829,050.00

Rp 25,080.00
Rp 6,650.00
Rp 3,500.00
Rp 420.00
Rp 525.00
Rp 36,175.00

Rp 46,488.75
Rp 2,756.25
Rp 8,360.00
Rp 26,400.00
Rp 3,168.00
Rp 660.00
Rp 87,833.00
Rp 88,452.00
Rp 4,200.00
Rp 19,000.00
Rp 10,000.00
Rp 1,200.00
Rp 150.00
Rp 123,002.00

Rp 34,650.00
Rp 1,050.00
Rp 23,750.00
Rp 15,000.00
Rp 1,800.00
Rp 1,950.00
Rp 78,200.00

Rp 84,787.50
Rp 525.00
Rp 9,500.00
Rp 20,000.00
Rp 2,400.00
Rp 750.00
Rp 117,962.50

Rp 244,755.00
Rp 2,100.00
Rp 367,500.00
Rp 33,250.00
Rp 60,000.00
Rp 7,200.00
Rp 2,625.00
Rp 717,430.00
Rp 71,743.00

Rp 4,042,500.00
Rp 36,750.00
Rp 380,000.00
Rp 30,000.00
Rp 75,000.00
Rp 9,000.00
Rp 4,573,250.00

Rp 58,800.00
Rp 1,102.50
Rp 14,250.00
Rp 25,000.00
Rp 3,000.00
Rp 11,250.00
Rp 113,402.50

Rp 4,042,500.00
Rp 570,000.00
Rp 2,000,000.00
Rp 240,000.00
Rp 45,000.00
Rp 6,897,500.00

Rp 128,625.00
Rp 76,000.00
Rp 6,000.00
Rp 200,000.00
Rp 24,000.00
Rp 434,625.00
Rp 243,285.00
Rp 142,500.00
Rp 500,000.00
Rp 60,000.00
Rp 11,250.00
Rp 957,035.00

Rp 88,200.00
Rp 2,756.25
Rp 47,500.00
Rp 15,000.00
Rp 200,000.00
Rp 24,000.00
Rp 377,456.25

Rp 72,030.00
Rp 110,250.00
Rp 40,833.33
Rp 5,512.50
Rp 57,000.00
Rp 4,500.00
Rp 200,000.00
Rp 24,000.00
Rp 514,125.83

Rp 243,285.00
Rp 12,862.50
Rp 142,500.00
Rp 200,000.00
Rp 24,000.00
Rp 11,250.00
Rp 633,897.50

Rp 231,000.00
Rp 38,000.00
Rp 24,000.00
Rp 2,880.00
Rp 3,000.00
Rp 298,880.00

Rp 127,050.00
Rp 38,000.00
Rp 24,000.00
Rp 2,880.00
Rp 3,000.00
Rp 194,930.00

Rp 162,750.00
Rp 950.00
Rp 50,000.00
Rp 1,200.00
Rp 750.00
Rp 215,650.00

Rp 31,500.00
Rp 1,425.00
Rp 15,000.00
Rp 1,800.00
Rp 112.50
Rp 49,837.50

Rp 5,250.00
Rp 950.00
Rp 10,000.00
Rp 1,200.00
Rp 75.00
Rp 17,475.00

Rp 10,500.00
Rp 1,425.00
Rp 15,000.00
Rp 1,800.00
Rp 112.50
Rp 28,837.50

Rp -
Rp 4,750.00
Rp 50,000.00
Rp 6,000.00
Rp 375.00
Rp 61,125.00

Rp 7,000.00
Rp 1,140.00
Rp 150.00
Rp 3,000.00
Rp 360.00
Rp 11,650.00

Rp 63,000.00
Rp 1,140.00
Rp 150.00
Rp 3,000.00
Rp 360.00
Rp 67,650.00
Rp 15,750.00
Rp 1,140.00
Rp 150.00
Rp 3,000.00
Rp 360.00
Rp 20,400.00

Rp 38,500.00
Rp 4,042.50
Rp 17,812.50
Rp 22,500.00
Rp 4,500.00
Rp 1,575.00
Rp 88,930.00

Rp 34,020.00
Rp 551.25
Rp 6,650.00
Rp 10,000.00
Rp 1,200.00
Rp 525.00
Rp 52,946.25

Rp 11,000.00
Rp 285.00
Rp 4,750.00
Rp 7,500.00
Rp 500.00
Rp 360.00
Rp 24,395.00

Rp 16,170.00
Rp 570.00
Rp 14,250.00
Rp 25,000.00
Rp 3,000.00
Rp 11,250.00
Rp 70,240.00

Rp 1,680.00
Rp 4,368.00
Rp 7,125.00
Rp 25,000.00
Rp 3,000.00
Rp 562.50
Rp 41,735.50

Rp 3,465.00
Rp 17,577.00
Rp 5,000.00
Rp 7,350.00
Rp 25,000.00
Rp 3,000.00
Rp 375.00
Rp 61,767.00
mbok baru anti lumut ( 1 lapis plamir, 1 lapis cat dasar,

Rp 1,050.00
Rp 1,680.00
Rp 4,368.00
Rp 7,125.00
Rp 25,000.00
Rp 3,000.00
Rp 562.50
Rp 42,785.50
Rp 1,680.00
Rp 4,368.00
Rp 7,125.00
Rp 25,000.00
Rp 3,000.00
Rp 562.50
Rp 41,735.50

Rp 4,620.00
Rp 3,465.00
Rp 2,856.00
Rp 5,880.00
Rp 7,125.00
Rp 25,000.00
Rp 3,000.00
Rp 375.00
Rp 52,321.00

Rp 1,785,000.00
Rp 107,100.00
Rp 313,500.00
Rp 110,000.00
Rp 120.00
Rp 24,000.00
Rp 2,339,720.00

Rp 682,500.00
Rp 59,850.00
Rp 2,362.50
Rp 95,000.00
Rp 150,000.00
Rp 180,000.00
Rp 24,000.00
Rp 1,193,712.50
Rp 94,500.00
Rp 27,562.50
Rp 10,260.00
Rp 18,000.00
Rp 2,160.00
Rp 810.00
Rp 153,292.50

Rp 78,000.00
Rp 22,750.00
Rp 10,260.00
Rp 18,000.00
Rp 2,160.00
Rp 810.00
Rp 131,980.00

Rp 54,000.00
Rp 15,750.00
Rp 5,130.00
Rp 9,000.00
Rp 1,080.00
Rp 4,050.00
Rp 89,010.00

Rp 42,000.00
Rp 12,250.00
Rp 5,130.00
Rp 9,000.00
Rp 1,080.00
Rp 4,050.00
Rp 73,510.00

Rp 34,800.00
Rp 10,150.00
Rp 5,130.00
Rp 9,000.00
Rp 1,080.00
Rp 4,050.00
Rp 64,210.00

Rp 16,500.00
Rp 5,775.00
Rp 5,130.00
Rp 9,000.00
Rp 1,080.00
Rp 405.00
Rp 37,890.00

Rp 19,500.00
Rp 6,825.00
Rp 5,130.00
Rp 9,000.00
Rp 1,080.00
Rp 405.00
Rp 41,940.00

Rp 10,500.00
Rp 3,675.00
Rp 5,130.00
Rp 9,000.00
Rp 1,080.00
Rp 405.00
Rp 29,790.00

Rp 75,000.00
Rp 26,250.00
Rp 7,695.00
Rp 13,500.00
Rp 1,620.00
Rp 615.00
Rp 124,680.00

Rp 10,500.00
Rp 125.00
Rp 950.00
Rp 10,000.00
Rp 1,200.00
Rp 750.00
Rp 23,525.00

Rp 45,000.00
Rp 125.00
Rp 950.00
Rp 10,000.00
Rp 1,200.00
Rp 750.00
Rp 58,025.00

Rp 40,000.00
Rp 950.00
Rp 10,000.00
Rp 1,200.00
Rp 750.00
Rp 52,900.00
Rp 3,600,000.00
Rp 6,048,312.75
Rp 166,950.00
Rp 38,990.00
Rp 4,786,384.39
Rp 23,529,849.97
Rp 1,500,000.00
Rp 500,000.00
Rp 56,000.00
Rp 17,500.00

Rp 35,000.00
Rp 496,650.00
Rp 490,875.00
Rp 1,000,000.00
Rp 42,266,512.12
Rp 1,761,104.67

Rp 85,000.00
Rp 103,416.50
Rp 190,000.00
Rp 15,000.00
Rp 3,000.00
Rp 360.00
Rp 396,776.50

Rp 5,486.25
Rp 5,000.00
Rp 750.00
Rp 4,250.00
Rp 1,250.00
Rp 2,850.00
Rp 9,500.00
Rp 750.00
Rp 18,750.00
Rp 2,250.00
Rp 50,836.25

Rp 18,375.00
Rp 1,140.00
Rp 150.00
Rp 3,000.00
Rp 360.00
Rp 23,025.00

Rp 23,625.00
Rp 1,140.00
Rp 150.00
Rp 3,000.00
Rp 360.00
Rp 28,275.00

Rp 28,875.00
Rp 1,140.00
Rp 150.00
Rp 3,000.00
Rp 360.00
Rp 33,525.00

Rp 26,250.00
Rp 1,140.00
Rp 150.00
Rp 3,000.00
Rp 360.00
Rp 30,900.00
Rp 4,200.00
Rp 2,375.00
Rp 1,500.00
Rp 3,000.00
Rp 360.00
Rp 11,435.00

Rp 42,000.00
Rp 2,375.00
Rp 1,500.00
Rp 3,000.00
Rp 360.00
Rp 49,235.00

Rp 36,750.00
Rp 2,375.00
Rp 1,500.00
Rp 3,000.00
Rp 360.00
Rp 43,985.00

Rp 52,500.00
Rp 2,375.00
Rp 1,500.00
Rp 3,000.00
Rp 360.00
Rp 59,735.00

Rp 36,750.00
Rp 1,181.25
Rp 1,500.00
Rp 3,000.00
Rp 360.00
Rp 42,791.25
DAFTAR HARGA DASAR UPAH DAN BAHAN
LOKASI RAJA AMPAT

I. UPAH

No Tenaga Kerja Satuan Harga Dasar (Rp)

1 2 3 4

1 Mandor Org / Hr 150,000.00


2 Mekanik Org / Hr 110,000.00
3 Pembantu Mekanik Org / Hr 90,000.00
4 Kepala Tukang Org / Hr 120,000.00
5 Tukang Org / Hr 100,000.00
6 Operator Terlatih Org / Hr 105,000.00
7 Operator Tidak Terlatih Org / Hr 95,000.00
8 Pembantu Operator Org / Hr 90,000.00
9 Sopir Org / Hr 100,000.00
10 Pembantu Sopir Org / Hr 85,000.00
11 Buruh Terlatih Org / Hr 100,000.00
12 Buruh Tidak Terlatih Org / Hr 95,000.00

II. BAHAN
Harga Satuan Di
No Nama Bahan Satuan Lokasi Pekerjaan
(Rp)
1 2 3 4

1 Abu Batu M3 420,000.00


2 Alumunium Bondex M2 147,000.00
3 Alumunium Sirip M2 183,750.00
4 Aminium Foil M2 94,500.00
2 Amplas / Kertas Pasir Lbr 3,675.00
3 Aquistic Arm Strong Lbr 110,250.00
4 Armatur Lampu Sorot 250 W Bh 315,000.00
5 Armatur Lampu Sorot 400 W Bh 420,000.00
3 Aspal Kg 9,345.00 150 Kg / D
3 Agregat Kelas A M3 472,500.00 151 Kg / D
3 Agregat Kelas B M3 393,750.00 152 Kg / D
3 Atap Ardex Gelombang Besar Lbr 42,000.00
4 Atap Ardex Gelombang Kecil Lbr 39,900.00
5 Atap Plastik Gelombang Besar Lbr 63,000.00
6 Atap Plastik Gelombang Kecil Lbr 18,900.00
7 Atap Sakura Roof Bh 54,600.00
4 Baja Propiil INP , WF Kg 16,800.00
5 Bak Cuci Stanlis Steel 1 Lobang Bh 472,500.00
6 Bak Cuci Stanlis Steel 2 Lobang Bh 577,500.00
5 Batu Bata Merah BH 1,365.00
6 Batu Belah ( 15 - 20 Cm ) M3 577,500.00
7 Batu Karang M3 367,500.00
7 Batu Pecah 1 - 2 M3 577,500.00
8 Batu pecah 2 - 3 M3 577,500.00
9 Batu pecah 3 - 5 M3 577,500.00
10 Batu Pecah 5 - 7 M3 577,500.00
11 Batu Tela ( 10 x 20 x 30 ) cm BH 1,365.00 Batu Kara
12 Baut + Mur ID 3/8" - 7" s/d 14" Bh 4,725.00
13 Bensin Ltr 9,019.50
14 Besi Beton ID 5mm - 25mm Kg 15,855.00
15 Besi Plat 1mm - 9mm Kg 8,925.00
16 Besi Plat 3 mm Polos Lbr 1,050,000.00
17 Besi Plat 5 mm Polos Lbr 1,995,000.00
18 Besi Siku 50 x 50 x 5 m' 73,500.00
19 Besi Strip 20.3 - 50.5 Kg 15,750.00
Harga Satuan Di
No Nama Bahan Satuan Lokasi Pekerjaan
(Rp)
1 2 3 4
20 Besi Strip 2mm - 20mm m 17,850.00
21 Besi Tralis Naco Bh 6,300.00
22 Bingkai Pintu Alimunium Bh 262,500.00
23 Boplan / Trives SON H 250 W Bh 236,250.00
Harga Satuan Di
No Nama Bahan Satuan Lokasi Pekerjaan
(Rp)
1 2 3 4
24 Boplan / Trives SON H 400 W Bh 288,750.00
25 Box Meteran 30x40x40 cm Set 31,500.00
26 Cat Almunium Kg 37,432.50
22 Cat Besi Kg 31,500.00
23 Cat kilat Kayu Kg 31,500.00
24 Cat Meni Besi Kg 25,200.00
25 Cat Meni Besi Klg 23,100.00
26 Cat Meni Kayu Kg 23,100.00
27 Cat Tembok Kg 16,800.00
28 Dembul Kayu Kg 23,100.00
29 Engsel H Jendela Psg 5,250.00
30 Engsel H Pintu Psg 6,300.00
50 Engsel Lokal Psg 10,500.00
51 Engsel Pintu Psg 31,500.00
52 Exhoust Fan set 315,000.00
53 Flaser Fire Work Lampu Bh 2,100,000.00
54 Foto Cell Seleon AS 10 A Bh 210,000.00
55 Foto Cell Seleon AS 6 A Bh 183,750.00
56 Glass Block 20 x 20 Cm Bh 31,500.00
53 Grandel Jendela (klip) Bh 15,750.00
54 Grendel Besar Bh 63,000.00
54 Grendel Kecil Bh 15,750.00
55 Grendel Lokal Bh 3,150.00
56 Grendel Sedang Bh 19,950.00
57 Gypsumboard 1.22 X 2.44 M' Lbr 26,250.00
58 Hak Angin Biasa Psg 7,875.00
55 Hak Angin Lipat Psg 47,250.00
56 Harga Lift di Jkt Unit 371,070.00
29 ID 4" - 4 M' Btg 173,250.00
###
30 ID 5' - 6 M' Btg 225,750.00
###
31 ID 6" - 6 M' Btg 577,500.00
###
32 ID. 1" - M' 6 M' Btg 26,250.00
###
33 ID. 1.5" - 6 M' Btg 236,250.00
###
34 ID. 1/2" - 6 M' Btg 94,500.00
###
35 ID. 3" - 6 M' Btg 122,850.00
###
36 ID.1" - 6 M' Btg 157,500.00
###
37 ID.1/2" - 4 M' Btg 14,700.00
###
38 ID.2" - 4 M' Btg 73,500.00
###
39 ID.3" - 6 M' Btg 472,500.00
###
40 ID.3/4" - 4 M' Btg 19,950.00
###
41 ID.4" - 6 M' Btg 787,500.00
###
42 ID.5" - 6 M' Medium A Btg 840,000.00
###
42 ID.6" - 6 M' Btg 945,000.00
60 Isolator Ban Roll 10,500.00
61 Isolator Tali Rami Bh 8,400.00
62 Kabel NYM 2 x 1.5 mm M' 231,000.00
61 Kabel NYM 1 x 2.5 mm M' 367,500.00
62 Kabel NYM 3 x 1.5 mm M' 299,250.00
63 Kabel NYM 3 x 2.5 mm M' 404,250.00
64 Kabel NYM 3 x 4 mm M' 577,500.00
65 Kabel NYM 4 x 6 mm M' 105,000.00
66 Kabel SR (Sambungan Rumah) M' 7,875.00
67 Kabel Tanah NYFGY 4 x 9 mm M' 26,250.00
68 Kaca Lover Bening Lbr 8,925.00
69 Kaca Lover Buram Lbr 26,250.00
70 Kaca Lover Rayben Lbr 9,450.00
71 Kaca Naco dengan Trali 10 Klip Set 204,750.00
72 Kaca Naco dengan Trali 6 Klip Set 141,750.00
73 Kaca Naco dengan Trali 7 Klip Set 154,350.00
74 Kaca Naco dengan Trali 8 Klip Set 178,500.00
75 Kaca Naco dengan Trali 9 Klip Set 183,750.00
76 Kaca Polos Bening 3mm Lbr 115,500.00
Harga Satuan Di
No Nama Bahan Satuan Lokasi Pekerjaan
(Rp)
1 2 3 4
77 Kaca Polos Bening 5mm Lbr 183,750.00
78 Kaca Riben 3mm Lbr 131,250.00
79 Kaca Riben 5mm Lbr 210,000.00
43 Kait Angin Bh 10,500.00
Harga Satuan Di
No Nama Bahan Satuan Lokasi Pekerjaan
(Rp)
1 2 3 4
44 Kait Angin Bh 13,230.00
45 Kapasitator ut Lampu 250 W Bh 173,250.00
46 Kapasitator ut Lampu 400 W Bh 173,250.00
47 Kawat Bronjong Galvanisir Kg 15,750.00
48 Kawat Duri M' 9,450.00
###
49 Kawat Galvanis 13,650.00
50 Kawat Pagar BRC M1 210,000.00
51 Kawat Ikat RRC Kg 23,100.00
52 Kawat Las Dos 84,000.00
53 Kawat Las 2.6 Unit 126,000.00
54 Kawat Nyamuk Besi M1 26,250.00
55 Kawat Nyamuk Plastik M1 7,875.00
56 Kawat Ram M 1
13,125.00
57 Kayu Bakar / Kayu Putih M 3
1,050,000.00
54 Kayu Besi Kelas I M 3
3,675,000.00
55 Papan Kayu besi M3 3,675,000.00
56 Kayu Mangi - mangi Btg 7,350.00
57 kayu Kelas II ( Matoa ) M3 2,100,000.00
58 Kipas Angin set 787,500.00
58 Klem Alminium M' 26,250.00
59 Klem Tarik Bh 15,750.00
60 Kloset Duduk Porselin / KIA Bh 1,785,000.00
66 Kloset Jongkok Keramik Bh 367,500.00
67 Kloset Jongkok Porselin (ina) Bh 682,500.00
68 Kolom Beton Pracetak Btg 46,200.00
69 Kolset Duduk TOTO Bh 1,890,000.00
70 Konektor Bh 7,875.00
71 Kontaktor 1 Ph 40 A LCID 50 M7 Bh 787,500.00
72 Kontaktor 3 Ph 80 A LCID 50 M7 Bh 1,470,000.00
73 Koresone Ltr 9,450.00
74 Kosen Alumunium 12.6.3 M' 28,350.00
67 Kran Air 1/2" Bh 26,250.00
60 Kuas Biasa 2" Bh 7,875.00
61 Kuas Biasa 3" Bh 10,500.00
62 Kuas Rol Bh 26,250.00
63 Kunci Gembok Globe Bh 23,625.00
64 Kunci Gembok Royal Bh 36,750.00
65 Kunci Royal Besar Bh 183,750.00
66 Kunci Royal Kecil Bh 39,375.00
67 Kunci Tanam 2 Slag Bh 162,750.00
68 Kunci Terbang 2 Slag Bh 78,750.00
69 Kunci Yale 2 Slag Bh 68,250.00
70 Lampu Taman Set 131,250.00
71 Lampu Philips 400 W Komplit Set 309,750.00
72 Lampu Pijar 40 W DOP Bh 4,200.00
73 Lampu Pijar 60 W DOP Bh 4,200.00
74 Lampu Sorot 75 W Komplit Set 236,250.00
75 Lampu SON T 250 W Komplit Set 2,856,000.00
76 Lampu TL 20 W Komp. RRT Set 36,750.00
77 Lampu TL 40 W Komp. RRT Set 47,250.00
78 Lampu SL 18 W Komp. Set 42,000.00
79 Lampu SL 14 W Komp. Set 36,750.00
80 Lampu SL 23 W Komp. Set 52,500.00
81 Lasdop Bh 6,825.00
82 Lem Vinil Kg 30,975.00
83 Marmer Hitam 20 x 25 Dos 75,600.00
85 Marmer Hitam 60 x x90 lbr 498,750.00
86 Marmer Putih 30x30 Dos 47,250.00
88 Marmer Putih 40 x 40 Dos 58,800.00
89 MCB 32 A 1 Ph MG Bh 78,750.00
Harga Satuan Di
No Nama Bahan Satuan Lokasi Pekerjaan
(Rp)
1 2 3 4
90 MCB 32 A 3 Ph MG Bh 236,250.00
91 MCB 50 A MG Bh 166,950.00
92 Melamin 1.22 X 2.44 M' Lbr 5,250.00
93 Meni Besi Ltr 25,200.00
94 Meni Kayu Kg 25,200.00
Harga Satuan Di
No Nama Bahan Satuan Lokasi Pekerjaan
(Rp)
1 2 3 4
95 Minyak Bekisting Ltr 3,150.00
96 Minyak Cat / Tinner Kg 18,900.00
97 Minyak Tanah Ltr 3,885.00
98 Multi Pleks 9 mm Lbr 157,500.00
99 Multiplekx 12 mm 1.22 X 2.44 M' Lbr 220,500.00
100 Multiplekx 4 mm 1.22 X 2.44 M' Lbr 63,000.00
101 Multiplekx 3 mm 1.22 X 2.44 M' Lbr 58,275.00
102 Multiplekx 9 mm 1.22 X 2.44 M' Lbr 194,250.00
103 Nok Atap Sakura Roof Bh 31,500.00
101 Pagar Kawat Jaring Galv. Glg 22,050.00
102 Paku Ardeks Kg 21,000.00
103 Paku Asbes Kg 26,250.00
104 Paku Biasa Kg 18,375.00
105 Paku Jembatan Kg 13,125.00
106 Paku Persegi Kg 13,125.00
107 Paku Sekrup Kg 10,500.00
108 Paku Seng Kg 21,000.00
109 Paku Tembok 7 - 10 Cm Kg 15,750.00
110 Paku Tripleks Kg 21,000.00
111 Panel Beton Pracetak Lbr 68,250.00
112 Panel Box 30x40x20 Cm Box 367,500.00
113 Pasir Cor Beton M3 236,250.00
114 Pasir Pasang M3 236,250.00
115 Pasir Plester M3 241,500.00
116 Pasir Urug M3 157,500.00
117 Paving Block 10 x 20 Bh 3,675.00
118 PCI Bh 9,975.00
119 Pewarna Plitur Bks 2,100.00
120 Pewarna Plitur Bks 2,100.00
121 Pipa Besi Listrik 5/8" - 6 Btg 42,000.00
122 Pipa GIP 2" m' 78,750.00
###
123 Pipa gip 2,5" m' 157,500.00
###
124 Pipa Gip 3 " m' 315,000.00
125 Pipa Stanlis Steel ID 2" - 6 Btg 231,000.00
126 Pitting Plafon Bh 11,550.00
127 Pitur Bh 31,500.00
128 Plamur Besi Kg 26,250.00
129 Plamur Kayu Kg 34,650.00
130 Plamur Tembok 4 kg Kg 10,500.00
131 Playwood 1.22 X 2.44 M' Lbr 94,500.00
132 Plin Ubin 10 x 30 Bj 8,400.00
133 Plitur jadi Kg 47,250.00
134 Pompa Air Honda 3.5 PK Bh 3,937,500.00
135 Pompa Dragon Bh 283,500.00
136 Pompa Sanyo Besar Bh 3,937,500.00
137 Pompa Sanyo kecil Bh 524,475.00
138 Porselin 11 x 11 Cm Bh 7,245.00
139 Reservoir Cap. 1 M3 Fiberglas Bh 1,890,000.00
140 Residu Ltr 26,250.00
141 Saklar Double Tanam Bh 23,625.00
142 Saklar Engkel Tanam Bh 18,375.00
143 Seal Tip Besar Roll 8,400.00
144 Seal Tip Besar Roll 3,360.00
145 Sealent / Silicon Kg 44,625.00
146 Sekering Kas 1 Group Unit 36,750.00
147 Sekering Kas 2 Group Unit 23,100.00
148 Semen 50 Kg Zak 99,750.00
149 Semen Berwarna Kg 6,300.00
150 Semen Putih Kg 5,250.00 50 Kg
151 Seng BJLS. 20 Lbr 50,400.00
152 Seng BJLS. 30 Lbr 60,900.00
Harga Satuan Di
No Nama Bahan Satuan Lokasi Pekerjaan
(Rp)
1 2 3 4
153 Seng Plat BJLS 20 Lbr 36,750.00
154 Seng Plat BJLS 30 Lbr 58,800.00
155 Seng Talang BJLS 30 Lbr 36,750.00
Harga Satuan Di
No Nama Bahan Satuan Lokasi Pekerjaan
(Rp)
1 2 3 4
156 Shower Bh 126,000.00
157 Sikat Besi Bulat Bh 8,925.00
158 Sirlak Kg 99,750.00
159 Sirlak Bh 44,625.00
160 Sirtu M3 126,000.00
161 Solar Ltr 14,175.00
162 Strenger Besi Dia 3 mm m 1,575.00
163 Stang Lover 10 Klip Pas 105,000.00
164 Stang Lover 5 Klip Pas 52,500.00
165 Stang Lover 6 Klip Pas 63,000.00
166 Stang Lover 7 Klip Pas 73,500.00
167 Stang Lover 8 Klip Pas 84,000.00
168 Stang Lover 9 Klip Pas 94,500.00
169 Stempet Pail 101,850.00
170 Stempet Pail 446,250.00
171 Step Nosing Keramik 10 / 30 Bj 7,875.00
172 Stop Kontak Tanam Bh 28,875.00
173 Stop Kontak AC Bh 26,250.00
174 Talang PVC 4 - 6" - 6 M' Maspion Btg 89,250.00
###
175 Talang PVC 4 - 8" - 6 M' Maspion Btg 94,500.00
###
176 Tanah Timbunan M3 68,250.00
177 Teak Oil Kg 28,350.00
178 Teak Oil Kg 28,350.00
179 Teak Wood 1.22 X 2.44 M' Lbr 110,250.00
180 Tegel Glodback 40 X 40 cm Bh 58,800.00
181 Tiang Lampu Galv. Oktagonal 8m' Btg 3,307,500.00
182 Timah Solder Batang Rol 27,300.00
183 Timbunan Cadas M3 27,720.00
184 Time Swith Legran 30 A Bh 472,500.00
185 Travo Philips 250 Volt Bh 36,750.00
186 Travo Philips 400 Volt Bh 31,500.00
187 Tripleks 3mm 1.22 X 2.44 M' Lbr 49,875.00
188 Ubin Keramik Polos Dos 57,750.00
189 Ubin Keramik warna Dos 89,250.00
190 Ubin Keramik Polos 40 x 40 Dos 89,250.00
191 Ubin Olin PC 10 x 20 Dos 38,850.00
192 Ubin Plin Berwarna Dos 21,000.00
193 Ubin Porselin 20 x 20 Dos 68,250.00
194 Ubin Porselin 20 x 25 Dos 71,400.00
195 Ubin Porselin 20 x 22 Dos 68,252.10
196 Ubin Porselin 30 x 30 Dos 72,450.00
197 Ubin Porselin 40 x 40 Dos 78,750.00
198 Urukan Pilihan M3 157,500.00
199 Wastavel Ceramik (lengkap) Bh 735,000.00
200 Kitchensink (lengkap) Bh 682,500.00
200 Water Stop 150 M2 63,000.00
201 Water Stop 200 M2 75,600.00
202 Water Darain + Asesories set 57,750.00
DAFTAR HARGA DASAR SATUAN

NO UPAH DAN BAHAN SATUAN Spesifikasi / Merk

1 2 3 4
I UPAH KERJA
1 Pekerja Org/Hr -------
2 Tukang Org/Hr -------
3 Kepala Tukang Org/Hr -------
4 Mandor Org/Hr -------
II BAHAN MATERIAL LOKAL
1 Timbunan Pasir / Tanah urug M3 -------
2 Pasir Pasang M3 -------
3 Batu Gunung M3 -------
4 Batu Pecah M3 -------
5 Batu Merah Bh -------
III BAHAN MATERIAL LAIN
A. CAT
1 Cat Kayu Kg Glotex
2 Cat Meni Kayu Kg Yoko
3 Cat Tembok Interior Kg Enviteks
4 Cat Plafond Kg Metrolite
5 Cat Tembok Exterior Kg Mowilex Exterior
6 Kuas 4" Bh -------
7 Plamur Tembok Zak A-Plus @ 20 Kg
8 Plamur Kayu Kg Cap Kucing
9 Tenner - A Ltr -------
10 Minyak bekisting Ltr -------
11 Dempul Kg -------
12 Ampelas M' -------
B. SEMEN
1 Semen P.C Zak Tonasa @ 40 Kg
2 Semen P.C Zak Semen Putih @ 50 Kg
3 Semen Warna Kg Nat keramik
C. KAYU
1 Kayu Kls.I ( Papan ) M3 Bayam
2 Kayu Kls.I ( Balok ) M3 Bayam
3 Kayu Kls.II ( Papan ) M3 Meranti / Kapur
4 Kayu Kls.II ( Balok ) M3 Meranti / Kapur
5 Kayu Kls.II M3 Lokal
6 Kayu Kls.III ( Papan ) M3 Lokal
7 Kayu Kls.III ( Balok ) M3 Lokal
8 Bambu Btg Lokal
9 Looster Kayu Bh -------
10 Woodplank Bh
D. BESI
1 Besi Tulangan Kg Besi Polos
2 Besi Strip Kg -------
3 Kawat Beton Kg -------
4 Besi Teralis Set Pengaman Jendela
5 Besi Hollow 4/4 ( 1 Set ) M' Frame Besi Pagar
6 Besi Hollow 2/4 ( 1 Set ; H = 0,55 M ) M' Kisi -Kisi Teras
7 Paku Biasa Kg -------
NO UPAH DAN BAHAN SATUAN Spesifikasi / Merk

E. ATAP & PLAFOND


1 Genteng Metal Bh Sakura
2 Nok Genteng Metal Bh Sakura
4 Kalsiboard Lbr -------
5 List Plafond Kayu M' Profil
F. TEGEL KERAMIK
1 Tegel Keramik Warna 20/20 cm M2 Impresso
2 Tegel Keramik Warna 20/25 cm M2 Impresso
3 Tegel Keramik Warna 30/30 cm M2 Impresso
4 Tegel Keramik Warna 40/40 cm M2 Impresso
G. BAHAN KACA
1 Kaca Grafis M2 Tebal 3mm
2 Kaca Bening M2 Tebal 5mm
H. BAHAN SANITAIR
1 Closat Duduk Lengkap + Assesories Bh D-Uero
2 Closat Jongkok Bh
3 Kran Air Angsa Bh Onda
4 Kran Double Shower Bh Onda
5 Shower Gantung Bh Onda
6 Floor Drain Bh -------
7 Seal Tape Bh -------
8 Ijuk M2 -------
9 Washtafel Logam Bh Royal
10 Pipa PVC D ( Dia : 4" ) Btg -------
11 Pipa PVC D ( Dia : 3" ) Btg -------
12 Pipa PVC D ( Dia : 0,5 " ) Btg -------
13 Pipa Listrik ( Dia : 5/8 " ) Btg -------
I. KUNCI PENGGANTUNG
1 Kunci Pintu 2x Slaag Bh Bellucci
2 Engsel Jendela / Pintu Psg SES
3 Hak Angin Psg -------
4 Grendel Jendela Psg -------
J. INSTALASI LISTRIK
1 Lampu SL 18 Watt Bh Philips
2 Lampu SL 7 Watt Bh Philips
3 Kap Down Light + Lampu 20 Watt Bh -------
4 Lampu Hias Bh Ruang Tamu
5 Lampu Hias Tempel Bh Ornamen Teras
6 Stop Kontak Bh Broco
7 Saklar Tunggal Putih Bh Broco
8 Saklar Ganda Putih Bh Broco
9 Sekering Kast Lokal 1 Group Bh -------
10 Sekering Kast Lokal 2 Group Bh -------
11 Fitting Bh -------
UAN

HARGA SATUAN

50,000.00
85,000.00
100,000.00
100,000.00

Rp 100,000.00
Rp 150,000.00
Rp 175,000.00
Rp 300,000.00
Rp 500.00

Rp 45,000.00
Rp 15,000.00
Rp 25,000.00
Rp 25,000.00
Rp 85,000.00
Rp 15,000.00
Rp 50,000.00
Rp 25,000.00
Rp 18,500.00
Rp 5,000.00
Rp 30,000.00
Rp 10,000.00

Rp 45,000.00
Rp 53,000.00
Rp 4,500.00

Rp 12,000,000.00
Rp 10,000,000.00
Rp 4,500,000.00
Rp 4,500,000.00
Rp 3,000,000.00
Rp 2,000,000.00
Rp 2,000,000.00
Rp 20,000.00
Rp 35,000.00
Rp 85,000.00

Rp 14,500.00
Rp 13,500.00
Rp 20,000.00
Rp 250,000.00
Rp 450,000.00
Rp 275,000.00
Rp 15,000.00
HARGA ( Rp )

Rp 37,500.00
Rp 37,500.00
Rp 65,000.00
Rp 5,000.00

Rp 50,000.00
Rp 60,000.00
Rp 50,000.00
Rp 60,000.00

Rp 150,000.00
Rp 80,000.00

Rp 1,500,000.00
Rp 250,000.00
Rp 45,000.00
Rp 55,000.00
Rp 45,000.00
Rp 10,000.00
Rp 5,000.00
Rp 6,500.00
Rp 180,000.00
Rp 55,500.00
Rp 40,000.00
Rp 15,000.00
Rp 8,000.00

Rp 75,000.00
Rp 12,500.00
Rp 7,500.00
Rp 7,500.00

Rp 27,000.00
Rp 25,000.00
Rp 50,000.00
Rp 350,000.00
Rp 125,000.00
Rp 12,500.00
Rp 12,500.00
Rp 20,000.00
Rp 10,000.00
Rp 15,000.00
Rp 10,000.00
ANALISA HARGA SATUAN PEKERJAAN

HARGA SAT. UPAH &


NO URAIAN PEKERJAAN JUMLAH HARGA
BAHAN
1 2 3 4

1 1 M2 Membersihkan lapangan dan perataannya


0.100 Org/Hr Pekerja Rp 100,000.00 Rp 10,000.00
0.050 Org/Hr Mandor Rp 180,000.00 Rp 9,000.00
Rp 19,000.00
2 1 M' Pengukuran dan pemasangan bouwplank
0.012 m3 Kayu balok Kls II Rp 2,000,000.00 Rp 24,000.00
0.020 Kg Paku biasa 2"-5" Rp 9,000.00 Rp 180.00
0.007 m3 Kayu papan KLs III Rp 2,000,000.00 Rp 14,000.00
0.100 Org/Hr Tukang Kayu Rp 130,000.00 Rp 13,000.00
0.100 Org/Hr Pekerja Rp 100,000.00 Rp 10,000.00
0.010 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,500.00
0.005 Org/Hr Mandor Rp 180,000.00 Rp 900.00
Rp 63,580.00

3 1 M3 Galian tanah biasa


0.400 Org/Hr Tukang gali Rp 90,000.00 Rp 36,000.00
0.040 Org/Hr Mandor Rp 180,000.00 Rp 7,200.00
Rp 43,200.00
4 1 M3 Urugan tanah kembali
0.192 Org/Hr Tukang gali Rp 90,000.00 Rp 17,280.00
0.019 Org/Hr Mandor Rp 180,000.00 Rp 3,420.00
Rp 20,700.00
5 1 M3 Urugan pasir
1.000 m3 Pasir urug Rp 360,000.00 Rp 360,000.00
0.300 Org/Hr Pekerja Rp 90,000.00 Rp 27,000.00
0.010 Org/Hr Mandor Rp 180,000.00 Rp 1,800.00
Rp 388,800.00
1 M3 Urugan Tanah
1.000 m3 Pasir urug Rp 360,000.00 Rp 360,000.00
0.300 Org/Hr Pekerja Rp 90,000.00 Rp 27,000.00
0.010 Org/Hr Mandor Rp 180,000.00 Rp 1,800.00
Rp 388,800.00
6 1 M3 Pasangan pondasi batu kosong
1.000 m3 Batu Gunung Rp 560,000.00 Rp 560,000.00
0.780 Org/Hr Pekerja Rp 90,000.00 Rp 70,200.00
0.390 Org/Hr Tukang batu Rp 120,000.00 Rp 46,800.00
0.039 Org/Hr Kepala Tukang Rp 150,000.00 Rp 5,850.00
0.039 Org/Hr Mandor Rp 180,000.00 Rp 7,020.00
Rp 689,870.00
7 1 M3 Pasangan pondasi batu gunung, 1 Pc : 4 Ps
1.000 m3 Batu Gunung Rp 560,000.00 Rp 560,000.00
130.400 Kg Semen portland Rp 1,800.00 Rp 234,720.00
0.520 m 3
Pasir pasang Rp 360,000.00 Rp 187,200.00
1.500 Org/Hr Pekerja Rp 90,000.00 Rp 135,000.00
0.600 Org/Hr Tukang batu Rp 120,000.00 Rp 72,000.00
0.060 Org/Hr Kepala Tukang Rp 150,000.00 Rp 9,000.00
0.075 Org/Hr Mandor Rp 180,000.00 Rp 13,500.00
Rp 1,211,420.00
1 2 3 4
8 1 M Membuat Beton Bertulang
3

( Pembesian + Cor + Bekisting )


0.270 m3 Kayu kls. II Rp 2,000,000.00 Rp 540,000.00
2.000 Kg Paku biasa 2"-5" Rp 9,000.00 Rp 18,000.00
0.600 Lt Minyak bekisting Rp 10,000.00 Rp 6,000.00
125.000 Kg Besi Tulangan ( Polos ) Rp 8,000.00 Rp 1,000,000.00
3.000 Kg Kawat beton Rp 4,550.00 Rp 13,650.00
258.400 Kg Semen portland Rp 1,800.00 Rp 465,120.00
0.520 m3 Pasir beton Rp 360,000.00 Rp 187,200.00
0.780 m3 Koral beton Rp 360,000.00 Rp 280,800.00
4.850 Org/Hr Pekerja Rp 90,000.00 Rp 436,500.00
0.350 Org/Hr Tukang batu Rp 120,000.00 Rp 42,000.00
1.560 Org/Hr Tukang kayu Rp 120,000.00 Rp 187,200.00
1.400 Org/Hr Tukang besi Rp 120,000.00 Rp 168,000.00
0.331 Org/Hr Kepala Tukang Rp 150,000.00 Rp 49,650.00
0.170 Org/Hr Mandor Rp 180,000.00 Rp 30,600.00
Rp 3,424,720.00
9 1 M3 Beton Tumbuk ( Rabat ) 1 : 3 : 5
0.8700 m3 Batu Pecah Rp 560,000.00 Rp 487,200.00
0.5200 m 3
Pasir Beton Rp 360,000.00 Rp 187,200.00
218.0000 Kg Semen PC Rp 1,800.00 Rp 392,400.00
1.6500 Org/Hr Pekerja Rp 90,000.00 Rp 148,500.00
0.2500 Org/Hr Tukang Batu Rp 120,000.00 Rp 30,000.00
0.0250 Org/Hr Kepala Tukang Rp 150,000.00 Rp 3,750.00
Rp 1,249,050.00
10 1 M2 Pasangan bata merah t : 1 bata, 1 Pc : 4 Ps
180.000 Bh Batako Rp 2,000.00 Rp 360000
26.500 Kg Semen portland Rp 1,800.00 Rp 47700
0.093 m3 Pasir pasang Rp 360,000.00 Rp 33480
0.650 Org/Hr Pekerja Rp 90,000.00 Rp 58500
0.200 Org/Hr Tukang batu Rp 120,000.00 Rp 24000
0.020 Org/Hr Kepala Tukang Rp 150,000.00 Rp 3000
0.030 Org/Hr Mandor Rp 180,000.00 Rp 5,400.00
Rp 532,080.00
11 1 M2 Pasangan bata merah t : 1/2 bata, 1 Pc : 4 Ps
90.000 Bh Batako Rp 2,000.00 Rp 180,000.00
11.500 Kg Semen portland Rp 1,800.00 Rp 20,700.00
0.043 m3 Pasir pasang Rp 360,000.00 Rp 15,480.00
0.320 Org/Hr Pekerja Rp 90,000.00 Rp 28,800.00
0.100 Org/Hr Tukang batu Rp 120,000.00 Rp 12,000.00
0.010 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,500.00
0.015 Org/Hr Mandor Rp 180,000.00 Rp 2,700.00
Rp 261,180.00
12 1 M2 Pasangan bata merah t : 1/2 bata, 1 Pc : 2 Ps
90.000 Bh Batako Rp 2,000.00 Rp 180,000.00
18.950 Kg Semen portland Rp 1,800.00 Rp 34,110.00
0.038 m3 Pasir pasang Rp 360,000.00 Rp 13,680.00
0.320 Org/Hr Pekerja Rp 90,000.00 Rp 28,800.00
0.100 Org/Hr Tukang batu Rp 120,000.00 Rp 12,000.00
0.010 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,500.00
0.015 Org/Hr Mandor Rp 180,000.00 Rp 2,700.00
Rp 272,790.00
13 1 M2 Plasteran, 1 Pc : 4 Ps tebal 15 mm
5.200 Kg Semen portland Rp 1,800.00 Rp 9,360.00
0.020 m 3
Pasir pasang Rp 360,000.00 Rp 7,200.00
0.200 Org/Hr Pekerja Rp 90,000.00 Rp 18,000.00
0.150 Org/Hr Tukang batu Rp 120,000.00 Rp 18,000.00
0.015 Org/Hr Kepala Tukang Rp 150,000.00 Rp 2,250.00
0.010 Org/Hr Mandor Rp 180,000.00 Rp 1,800.00
Rp 56,610.00
1 2 3 4
14 1 M Plasteran, 1 Pc : 2 Ps tebal 15 mm
2

8.520 Kg Semen portland Rp 1,800.00 Rp 15,336.00


0.017 m3 Pasir pasang Rp 360,000.00 Rp 6,120.00
0.200 Org/Hr Pekerja Rp 90,000.00 Rp 18,000.00
0.150 Org/Hr Tukang batu Rp 120,000.00 Rp 18,000.00
0.015 Org/Hr Kepala Tukang Rp 150,000.00 Rp 2,250.00
0.010 Org/Hr Mandor Rp 180,000.00 Rp 1,800.00
Rp 61,506.00
15 1 M2 Acian dinding tembok
0.072 Kg Semen portland Rp 1,800.00 Rp 129.60
0.075 m 3
Tukang Rp 120,000.00 Rp 9,000.00
0.008 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,200.00
0.050 Org/Hr Pekerja Rp 90,000.00 Rp 4,500.00
0.005 Org/Hr Mandor Rp 150,000.00 Rp 750.00
Rp 15,579.60
16 1 M2 Pasang lantai keramik 30 x 30 cm
1.000 m2 Keramik 30 x 30 cm Rp 85,000.00 Rp 85,000.00
8.160 Kg semen portland Rp 1,800.00 Rp 14,688.00
0.0230 m 3
pasir pasang Rp 360,000.00 Rp 8,280.00
0.900 Kg semen warna Rp 5,000.00 Rp 4,500.00
0.250 Org/Hr Pekerja Rp 90,000.00 Rp 22,500.00
0.120 Org/Hr Tukang batu Rp 120,000.00 Rp 14,400.00
0.0120 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,800.00
0.0125 Org/Hr Mandor Rp 180,000.00 Rp 2,250.00
Rp 153,418.00
17 1 M2 Pasang lantai keramik 20 x 20 cm
1.000 m2 keramik 20 x 20 cm Rp 85,000.00 Rp 85,000.00
8.760 Kg semen portland Rp 1,800.00 Rp 15,768.00
0.023 m 3
pasir pasang Rp 360,000.00 Rp 8,280.00
0.900 Kg semen warna/nat Rp 5,000.00 Rp 4,500.00
0.250 Org/Hr Pekerja Rp 90,000.00 Rp 22,500.00
0.120 Org/Hr Tukang batu Rp 120,000.00 Rp 14,400.00
0.0120 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,800.00
0.0125 Org/Hr Mandor Rp 180,000.00 Rp 2,250.00
Rp 154,498.00
18 1 M2 Pasang lantai keramik 20 x 25 cm
1.000 m2 keramik 20 x 25 cm Rp 85,000.00 Rp 85,000.00
8.760 Kg semen portland Rp 1,800.00 Rp 15,768.00
0.023 m 3
pasir pasang Rp 360,000.00 Rp 8,280.00
0.900 Kg semen warna/nat Rp 5,000.00 Rp 4,500.00
0.250 Org/Hr Pekerja Rp 90,000.00 Rp 22,500.00
0.120 Org/Hr Tukang batu Rp 120,000.00 Rp 14,400.00
0.0120 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,800.00
0.0125 Org/Hr Mandor Rp 180,000.00 Rp 2,250.00
Rp 154,498.00
1 2 3 4
19 1 M Pasang Konst. kuda-kuda /gording ( ky. Kls II )
3

1.000 m3 Kayu Kelas II Rp 2,000,000.00 Rp 2,000,000.00


15.000 Kg Besi strip Rp 15,000.00 Rp 225,000.00
0.800 Kg Paku biasa 2"- 5" Rp 9,000.00 Rp 7,200.00
2.000 Org/Hr Pekerja Rp 90,000.00 Rp 180,000.00
6.000 Org/Hr Tukang kayu Rp 120,000.00 Rp 720,000.00
0.600 Org/Hr Kepala Tukang Rp 150,000.00 Rp 90,000.00
0.060 Org/Hr Mandor Rp 180,000.00 Rp 10,800.00
Rp 3,233,000.00
20 1 M2 Pasang kaso + reng kayu Kls. II
0.014 m3 Kayu balok Kls. II Rp 2,000,000.00 Rp 28,000.00
0.150 Kg Paku biasa 2"- 5" Rp 9,000.00 Rp 1,350.00
0.100 Org/Hr Pekerja Rp 90,000.00 Rp 9,000.00
0.100 Org/Hr Tukang kayu Rp 120,000.00 Rp 12,000.00
0.010 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,500.00
0.005 Org/Hr Mandor Rp 180,000.00 Rp 900.00
Rp 52,750.00
21 1 M2 Pasang atap genteng metal
1.100 Bh Genteng Metal Rp 170,550.00 Rp 187,605.00
0.100 Org/Hr Pekerja Rp 90,000.00 Rp 9,000.00
0.100 Org/Hr Tukang kayu Rp 120,000.00 Rp 12,000.00
0.010 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,500.00
0.005 Org/Hr Mandor Rp 180,000.00 Rp 900.00
Rp 211,005.00
22 1 M' Pasang nok genteng metal
1.000 Bh Nok Genteng Metal Rp 111,800.00 Rp 111,800.00
0.050 Kg Paku biasa 1/2"- 1" Rp 9,000.00 Rp 450.00
0.250 Org/Hr Pekerja Rp 90,000.00 Rp 22,500.00
0.150 Org/Hr Tukang kayu Rp 120,000.00 Rp 18,000.00
0.015 Org/Hr Kepala Tukang Rp 150,000.00 Rp 2,250.00
0.013 Org/Hr Mandor Rp 180,000.00 Rp 2,340.00
Rp 157,340.00
23 1 M' Pasang Woodplank
0.2500 M' Woodplank L= 30 cm Rp 900,000.00 Rp 225,000.00
0.060 Kg Paku biasa 2"- 5" Rp 15,000.00 Rp 900.00
0.100 Org/Hr Pekerja Rp 90,000.00 Rp 9,000.00
0.100 Org/Hr Tukang kayu Rp 120,000.00 Rp 12,000.00
0.010 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,500.00
0.050 Org/Hr Mandor Rp 180,000.00 Rp 9,000.00
Rp 257,400.00
24 1 M2 Pasang rangka Holo 2/4
2.000 M' Besi Holo 2/4 Rp 25,000.00 Rp 50,000.00
0.100 Kg Paku biasa Skrup Rp 15,000.00 Rp 1,500.00
0.150 Org/Hr Pekerja Rp 90,000.00 Rp 13,500.00
0.250 Org/Hr Tukang kayu Rp 120,000.00 Rp 30,000.00
0.025 Org/Hr Kepala Tukang Rp 150,000.00 Rp 3,750.00
0.075 Org/Hr Mandor Rp 180,000.00 Rp 13,500.00
Rp 112,250.00
25 1 M2 Pas.Plafond Calsiboard
0.347 Lbr Calsiboard Rp 65,000.00 Rp 22,569.44
0.010 Kg Sekrup Rp 15,000.00 Rp 150.00
0.030 Org/Hr Pekerja Rp 90,000.00 Rp 2,700.00
0.070 Org/Hr Tukang kayu Rp 120,000.00 Rp 8,400.00
0.007 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,050.00
0.0015 Org/Hr Mandor Rp 180,000.00 Rp 270.00
Rp 35,139.44
1 M2 Pas.Plafond Eternit
1.100 Lbr Eternit Rp 12,000.00 Rp 13,200.00
0.010 Kg Sekrup Rp 15,000.00 Rp 150.00
0.030 Org/Hr Pekerja Rp 90,000.00 Rp 2,700.00
0.070 Org/Hr Tukang kayu Rp 120,000.00 Rp 8,400.00
0.007 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,050.00
0.0015 Org/Hr Mandor Rp 180,000.00 Rp 270.00
Rp 25,770.00
1 2 3 4
26 1 M Pasang list plafond Kayu profil
'

1.000 m' List Kayu Profil Rp 5,000.00 Rp 5,000.00


0.010 Kg Paku Rp 15,000.00 Rp 150.00
0.021 Org/Hr Pekerja Rp 90,000.00 Rp 1,890.00
0.021 Org/Hr Tukang kayu Rp 120,000.00 Rp 2,520.00
0.002 Org/Hr Kepala Tukang Rp 150,000.00 Rp 300.00
0.001 Org/Hr Mandor Rp 180,000.00 Rp 180.00
Rp 10,040.00
27 1 M3 Pasang kusen pintu dan jendela kayu Kls I
1.050 m3 Kayu Kls I, balok Rp 3,500,000.00 Rp 3,675,000.00
6.000 Org/Hr Pekerja Rp 90,000.00 Rp 540,000.00
18.000 Org/Hr Tukang kayu Rp 120,000.00 Rp 2,160,000.00
2.000 Org/Hr Kepala Tukang Rp 150,000.00 Rp 300,000.00
0.300 Org/Hr Mandor Rp 180,000.00 Rp 54,000.00
Rp 6,729,000.00
1 M3 Pasang kusen pintu dan jendela kayu Kls II
1.050 m3 Kayu Kls II, balok Rp 2,000,000.00 Rp 2,100,000.00
6.000 Org/Hr Pekerja Rp 90,000.00 Rp 540,000.00
18.000 Org/Hr Tukang kayu Rp 120,000.00 Rp 2,160,000.00
2.000 Org/Hr Kepala Tukang Rp 150,000.00 Rp 300,000.00
0.300 Org/Hr Mandor Rp 180,000.00 Rp 54,000.00
Rp 5,154,000.00
28 1 M2 Pasang pintu dan jendela kayu Kls I
0.035 m3 Kayu Kls I, papan Rp 4,500,000.00 Rp 157,500.00
0.800 Org/Hr Pekerja Rp 90,000.00 Rp 72,000.00
2.000 Org/Hr Tukang kayu Rp 120,000.00 Rp 240,000.00
0.200 Org/Hr Kepala Tukang Rp 150,000.00 Rp 30,000.00
0.040 Org/Hr Mandor Rp 180,000.00 Rp 7,200.00
Rp 506,700.00
1 M2 Pasang pintu Double Plywood t. 4mm
0.0196 m3 Papan kayu klas II Rp 2,500,000.00 Rp 49,000.00
0.030 kg Paku biasa Rp 9,000.00 Rp 270.00
0.300 Lt Lem kayu Rp 9,000.00 Rp 2,700.00
1.000 Lbr Plywood 4 mm Rp 45,000.00 Rp 45,000.00
0.600 Org/Hr Pekerja Rp 90,000.00 Rp 54,000.00
2.000 Org/Hr Tukang Kayu Rp 120,000.00 Rp 240,000.00
0.200 Org/Hr Kepala tukang Rp 150,000.00 Rp 30,000.00
0.030 Org/Hr Mandor Rp 180,000.00 Rp 5,400.00
Rp 426,370.00
1 M2 Pasang pintu dan jendela kayu Kls II
0.035 m3 Kayu Kls II, papan Rp 2,500,000.00 Rp 87,500.00
0.800 Org/Hr Pekerja Rp 90,000.00 Rp 72,000.00
2.000 Org/Hr Tukang kayu Rp 120,000.00 Rp 240,000.00
0.200 Org/Hr Kepala Tukang Rp 150,000.00 Rp 30,000.00
0.040 Org/Hr Mandor Rp 180,000.00 Rp 7,200.00
Rp 436,700.00
29 1 M2 Daun Jendela Kaca Bening
0.7800 m2 Kaca Bening 5 mm Rp. 38,000.00 Rp. 29,640.00
0.0140 m 3
Papan Kls.II Rp. 2,500,000.00 Rp. 35,000.00
2.5000 Org/Hr Pekerja Rp. 90,000.00 Rp. 225,000.00
1.5000 Org/Hr Tukang Kayu Rp. 120,000.00 Rp. 180,000.00
0.1500 Org/Hr Kepala Tukang Rp. 150,000.00 Rp. 22,500.00
0.1250 Org/Hr Mandor Rp. 180,000.00 Rp. 22,500.00
Rp. 514,640.00
1 2 3 4
1 M Kaca Bening
2

1.1000 m2 Kaca Bening 5 mm Rp. 38,000.00 Rp. 41,800.00


0.0150 Org/Hr Pekerja Rp. 90,000.00 Rp. 1,350.00
0.1500 Org/Hr Tukang Kayu Rp. 90,000.00 Rp. 13,500.00
0.0150 Org/Hr Kepala Tukang Rp. 120,000.00 Rp. 1,800.00
0.0008 Org/Hr Mandor Rp. 150,000.00 Rp. 112.50
Rp. 58,562.50
30 1 M2 Pengecatan tembok baru ( Interior )
( 1 Lapis Plamir + 1 Lapis Cat dasar+2 lapis cat penutup)
0.100 Kg Plamur A - Plus Rp 15,600.00 Rp 1,560.00
0.100 Kg Cat dasar Rp 35,490.00 Rp 3,549.00
0.260 Kg Cat penutup 2 kali Rp 35,490.00 Rp 9,227.40
0.020 Org/Hr Pekerja Rp 90,000.00 Rp 1,800.00
0.063 Org/Hr Tukang cat Rp 120,000.00 Rp 7,560.00
0.006 Org/Hr Kepala Tukang Rp 150,000.00 Rp 945.00
0.0025 Org/Hr Mandor Rp 180,000.00 Rp 450.00
Rp 25,091.40
31 1 M2 Pengecatan tembok baru ( Exterior )
( 1 Lapis Plamir + 1 Lapis Cat dasar+2 lapis cat penutup)
0.100 Kg Plamur A - Plus Rp 15,600.00 Rp 1,560.00
0.100 Kg Cat dasar ( Mowilex Exterior ) Rp 35,490.00 Rp 3,549.00
0.260 Kg Cat penutup 2 kali (Mowilex Exterior) Rp 35,490.00 Rp 9,227.40
0.020 Org/Hr Pekerja Rp 90,000.00 Rp 1,800.00
0.063 Org/Hr Tukang cat Rp 120,000.00 Rp 7,560.00
0.006 Org/Hr Kepala Tukang Rp 150,000.00 Rp 945.00
0.0025 Org/Hr Mandor Rp 180,000.00 Rp 450.00
Rp 25,091.40
32 1 M2 Pengecatan bidang kayu baru (1 lapis plamir),
1 lapis cat dasar, 2 lapis cat penutup
0.20 Kg Cat meni Rp 15,600.00 Rp 3,120.00
0.150 Kg Plamur Kayu Rp 14,300.00 Rp 2,145.00
0.170 Kg Cat dasar ( Glotex ) Rp 115,342.50 Rp 19,608.23
0.260 Kg Cat penutup 2 kali ( Glotex ) Rp 115,342.50 Rp 29,989.05
0.070 Org/Hr Pekerja Rp 90,000.00 Rp 6,300.00
0.009 Org/Hr Tukang cat Rp 120,000.00 Rp 1,080.00
0.006 Org/Hr Kepala Tukang Rp 150,000.00 Rp 900.00
0.0025 Org/Hr Mandor Rp 180,000.00 Rp 450.00
Rp 63,592.28
33 1 M2 Mengecat Plafond
0.350 Kg Cat Plafond ( Mowilex Interior ) Rp 44,000.00 Rp 15,400.00
0.075 Org/Hr Tukang Cat Rp 120,000.00 Rp 9,000.00
0.008 Org/Hr Kepala Tukang Cat Rp 150,000.00 Rp 1,125.00
0.05 Org/Hr Pekerja Rp 90,000.00 Rp 4,500.00
0.00 Org/Hr Mandor Rp 180,000.00 Rp 450.00
Rp 30,475.00
34 Memasang 1 buah kran Ø3/4" atau Ø1/2"
1.000 Bh Kran air angsa Rp 27,300.00 Rp 27,300.00
0.025 Bh Seal tape Rp 6,500.00 Rp 162.50
0.010 Org/Hr Pekerja Rp 90,000.00 Rp 900.00
0.100 Org/Hr Tukang batu Rp 120,000.00 Rp 12,000.00
0.010 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,500.00
0.005 Org/Hr Mandor Rp 180,000.00 Rp 900.00
Rp 42,762.50
1 2 3 4
Memasang 1 kran air double shower
1.000 Bh Kran air double shower Rp 60,000.00 Rp 60,000.00
0.025 Bh Seal tape Rp 6,500.00 Rp 162.50
0.010 Org/Hr Pekerja Rp 90,000.00 Rp 900.00
0.100 Org/Hr Tukang batu Rp 120,000.00 Rp 12,000.00
0.010 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,500.00
0.005 Org/Hr Mandor Rp 180,000.00 Rp 900.00
Rp 75,462.50
35 Memasang 1 buah kloset Duduk ( Lengkap )
1.000 Bh Kloset Duduk ( Lengkap ) Rp 1,706,250.00 Rp 1,706,250.00
0.150 Kg Semen portland Rp 1,800.00 Rp 270.00
0.010 m3 Pasir pasang Rp 360,000.00 Rp 3,600.00
1.000 Org/Hr Pekerja Rp 90,000.00 Rp 90,000.00
1.500 Org/Hr Tukang batu Rp 120,000.00 Rp 180,000.00
1.500 Org/Hr Kepala Tukang Rp 150,000.00 Rp 225,000.00
0.160 Org/Hr Mandor Rp 180,000.00 Rp 28,800.00
Rp 2,233,920.00

Memasang 1 buah kloset Jongkok


1.000 Bh Kloset Jongkok Rp 109,200.00 Rp 109,200.00
0.150 Kg Semen portland Rp 1,800.00 Rp 270.00
0.010 m3 Pasir pasang Rp 360,000.00 Rp 3,600.00
1.000 Org/Hr Pekerja Rp 90,000.00 Rp 90,000.00
1.500 Org/Hr Tukang batu Rp 120,000.00 Rp 180,000.00
1.500 Org/Hr Kepala Tukang Rp 150,000.00 Rp 225,000.00
0.160 Org/Hr Mandor Rp 180,000.00 Rp 28,800.00
Rp 636,870.00

36 Memasang 1 M' pipa PVC type D Ø 0,5 "


1.050 M' Pipa PVC Rp 1,105,650.00 Rp 1,160,932.50
--- Perlengkapan ( 35% x harga pipa) Rp 386,977.50 Rp 386,977.50
0.054 Org/Hr Pekerja Rp 90,000.00 Rp 4,860.00
0.090 Org/Hr Tukang batu Rp 120,000.00 Rp 10,800.00
0.009 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,350.00
0.027 Org/Hr Mandor Rp 180,000.00 Rp 4,860.00
Rp 1,569,780.00

Memasang 1 M' pipa Listrik Ø 5/8 "


1.050 M' Pipa Listrik Rp 4,500.00 Rp 4,725.00
--- Perlengkapan ( 35% x harga pipa) Rp 1,575.00 Rp 1,575.00
0.054 Org/Hr Pekerja Rp 90,000.00 Rp 4,860.00
0.090 Org/Hr Tukang batu Rp 120,000.00 Rp 10,800.00
0.009 Org/Hr Kepala Tukang Rp 150,000.00 Rp 1,350.00
0.027 Org/Hr Mandor Rp 180,000.00 Rp 4,860.00
Rp 28,170.00

37 Memasang 1 M' pipa PVC type AW Ø 3"


1.050 M' Pipa PVC Rp 464,000.00 Rp 487,200.00
--- Perlengkapan ( 35% x harga pipa) Rp 162,400.00 Rp 162,400.00
0.081 Org/Hr Pekerja Rp 90,000.00 Rp 7,290.00
0.135 Org/Hr Tukang batu Rp 120,000.00 Rp 16,200.00
0.0135 Org/Hr Kepala Tukang Rp 150,000.00 Rp 2,025.00
0.0041 Org/Hr Mandor Rp 180,000.00 Rp 738.00
Rp 675,853.00
RENCANA ANGGARAN BIAYA
PROYEK : PEMBANGUNAN RUMAH SOSIAL
PEKERJAAN : PEMBANGUNAN 1 UNIT RUMAH TYPE 45
LOKASI : MAYBRAT , PAPUA BARAT
TAHUN : 2016

Harga Sat.
No. Uraian Pekerjaan Volume Sat.
Bahan & Upah

I PEK. PERSIAPAN
1 Pembersihan Lokasi 150.50 M2 Rp 19,000.00
2 Pengukuran & pasangan Bowplank 49.50 M Rp 63,580.00
Jumlah
II PEK. GALIAN & URUGAN TANAH
1 Pek. Galian Pondasi Batu Gunung 22.58 M3 Rp 43,200.00
2 Pek. Urugan Kembali Bekas Galian 5.64 M 3
Rp 20,700.00
3 Pek. Urugan Pasir Di Bawah Lantai bangunan 7.20 M3 Rp 388,800.00
Jumlah
III PEK. STRUKTUR
1 Pek. Beton Sloef 15/17 1.92 M3 Rp 3,424,720.00
2 Pek. Kolom Kayu Kelas II 10/10 0.78 M 3
Rp 3,233,000.00
3 Pek. Ringbalk Kayu Kelas II 10/10 0.75 M 3
Rp 3,233,000.00
4 Pek. Kuda-Kuda 0.71 M3 Rp 3,233,000.00
Jumlah
IV PEK.PASANGAN
1 Pas. Pondasi Batu Gunung ( 1:4 ) 26.34 M3 Rp 1,211,420.00
3 Pas. Dinding 1/2 Batu ( 1 :2 ) 29.30 M 2
Rp 272,790.00
4 Pas. Dinding 1/2 Batu ( 1 :4 ) 276.05 M2 Rp 261,180.00
5 Pek. Plesteran Dinding & Beton ( 1:4 ) + Acian 580.43 M2 Rp 72,189.60
6 Pek. Lantai Keramik 40x40 cm2 66.75 M 2
Rp 153,418.00
7 Pek. Lantai WC/KM 20x20 5.25 M2 Rp 154,498.00
8 Pas. Tegel Keramik Dinding & Bak Air Wc/Km 20x25 26.00 M2 Rp 154,498.00
Jumlah
V PEK. KUSEN,PINTU & JENDELA
1 Pek. Kusen 5/15 Kayu Klas I 7.36 M3 Rp 6,729,000.00
2 Pek. Pintu Panil Kayu Klas I t=3mm 12.80 M 2
Rp 506,700.00
4 Pek. Pintu Plywood Km/Wc 3.00 M2 Rp 426,370.00
5 Pek. Bingkai Jendela Jungkit Klas I + Kaca 3.93 M 2
Rp 506,700.00
6 Pas. Kunci Pintu 10.00 bh Rp 204,750.00
7 Pas. Engsel Pintu 10.00 Ps Rp 18,300.00
8 Pas. Engsel Jendela 10.00 Ps Rp 18,300.00
9 Pas. Grendel Pintu 10.00 bh Rp 10,900.00
10 Pas. Grendel Jendela 10.00 bh Rp 10,900.00
11 Pas. Hak Angin 10.00 Ps Rp 16,350.00
Jumlah
Harga Sat.
No. Uraian Pekerjaan Volume Sat.
Bahan & Upah

VI PEK. PLAFON
1 Pek. Plafon 98.00 M2 Rp 147,389.44
Jumlah
VII PEK. ATAP DAN LISTPLANK
1 Pek. Pas. Rangka Gording Kayu 5/10 Klas II 1.00 M3 Rp 3,233,000.00
2 Pas. Atap Genteng Metal 144.00 M2 Rp 211,005.00
3 Pas. Bubungan Atap Genteng Metal 8.00 M1 Rp 157,340.00
4 Pek. Pas. Woodplank L.30cm 17.40 M 2
Rp 257,400.00
Jumlah
VIII PEK. PENGECETAN
1 Pek. Pengecetan Dinding Tembok 580.43 M2 Rp 25,391.40
2 Pek. Pengecetan Plafon 98.00 M2 Rp 30,475.00
3 Pek. Pengecetan Kayu (kusen,pnt,jdl,L.plank) 56.85 M2 Rp 63,592.28
Jumlah
IX PEK. SANITAIR
1 Pek. Klosed Duduk 2.00 bh Rp 1,098,750.00
2 Pas. Tempat sabun 2.00 bh Rp 25,000.00
3 Pek. Floor Drain & Stainlees Steel 2.00 bh Rp 20,000.00
4 Pas. Kran Air 2.00 bh Rp 25,000.00
5 Pas. Kitcen zink + kran 2.00 set Rp 190,000.00
6 Pas. Instalasi Air Bersih PVC dia.1/2" 30.00 M1 Rp 1,569,780.00
7 Pas. Instalasi Air Kotor Padat 3" 5.00 M 1
Rp 675,853.00
8 Pas. Instalasi Air Kotor Cair 3" 20.00 M1 Rp 675,853.00
9 Pas. Accessoris Plambing 2.00 ls Rp 150,000.00
Jumlah
X PEK. SEPTIKTANK + RESAPAN 2 ls 3,000,000.00
Jumlah
XI PEK. LISTRIK
1 Pas. Instalasi Ttk Cahaya Lampu 18.00 ttk Rp 135,000.00
2 Pas. Instalasi Ttk Stop Kontak 8.00 ttk Rp 35,000.00
3 Pas. Lampu SL 18 Watt Merk Philips 4.00 bh Rp 35,000.00
4 Pas. Lampu SL 23 Watt Merk Philips 32.00 bh Rp 30,000.00
5 Pas. Stop Kontak 8.00 bh Rp 93,125.00
6 Pas. Saklar Tunggal 6.00 bh Rp 3,600.00
7 Pas. Saklar Double 4.00 bh Rp 6,000.00
8 Pas. Fitting lampu 18.00 bh Rp 25,000.00
9 Pas. Kabel Instalasi Listrik 2.00 Roll Rp 350,000.00
10 Pas. Pipa Union u/ kabel 5/8 20.00 M1 Rp 28,170.00
11 Pas. Skring Cas (MCB) 2.00 set Rp 81,250.00
Jumlah
XII PEK.ORNAMEN DEPAN
1 Pek.Beton Garuk 6.8 M2 Rp 250,000.00
Jumlah
XIII PEK.PEMBERSIHAN
1 Pek. Pembersihan 1.00 ls Rp 500,000.00
Jumlah Harga

Rp 2,859,500.00
Rp 3,147,210.00
Rp 6,006,710.00

Rp 975,240.00
Rp 116,825.63
Rp 2,799,360.00
Rp 3,891,425.63

Rp 6,571,609.59
Rp 2,528,206.00
Rp 2,432,832.50
Rp 2,288,964.00
Rp 13,821,612.09

Rp 31,905,774.25
Rp 7,992,747.00
Rp 72,099,261.36
Rp 41,900,792.96
Rp 10,240,651.50
Rp 811,114.50
Rp 4,016,948.00
Rp 168,967,289.57

Rp 49,555,047.60
Rp 6,485,760.00
Rp 1,279,110.00
Rp 1,989,912.24
Rp 2,047,500.00
Rp 183,000.00
Rp 183,000.00
Rp 109,000.00
Rp 109,000.00
Rp 163,500.00
Rp 62,104,829.84
Jumlah Harga

Rp 14,444,165.12
Rp 14,444,165.12

Rp 3,220,068.00
Rp 30,384,720.00
Rp 1,258,720.00
Rp 4,478,760.00
Rp 39,342,268.00

Rp 14,737,854.13
Rp 2,986,550.00
Rp 3,615,500.92
Rp 21,339,905.05

Rp 2,197,500.00
Rp 50,000.00
Rp 40,000.00
Rp 50,000.00
Rp 380,000.00
Rp 47,093,400.00
Rp 3,379,265.00
Rp 13,517,060.00
Rp 300,000.00
Rp 67,007,225.00
Rp 6,000,000.00
Rp 6,000,000.00

Rp 2,430,000.00
Rp 280,000.00
Rp 140,000.00
Rp 960,000.00
Rp 745,000.00
Rp 21,600.00
Rp 24,000.00
Rp 450,000.00
Rp 700,000.00
Rp 563,400.00
Rp 162,500.00
Rp 6,476,500.00

Rp 1,700,000.00
Rp 1,700,000.00

Rp 500,000.00
Rp 500,000.00
REKAPITULASI ANGGARAN

PROYEK : PEMBANGUNAN RUMAH SOSIAL


PEKERJAAN : PEMBANGUNAN 1 UNIT RUMAH TYPE 45
LOKASI : MAYBRAT , PAPUA BARAT
TAHUN : 2016

NO. URAIAN PEKERJAAN JUMLAH HARGA

I PEK. PERSIAPAN Rp 6,006,710.00


II PEK. GALIAN & URUGAN TANAH Rp 3,891,425.63
III PEK. STRUKTUR Rp 13,821,612.09
IV PEK.PASANGAN Rp 168,967,289.57
V PEK. KUSEN,PINTU & JENDELA Rp 62,104,829.84
VI PEK. PLAFON Rp 14,444,165.12
VII PEK. ATAP DAN LISTPLANK Rp 39,342,268.00
VIII PEK. PENGECETAN Rp 21,339,905.05
IX PEK. SANITAIR Rp 67,007,225.00
X PEK. SEPTIKTANK + RESAPAN Rp 6,000,000.00
XI PEK. LISTRIK Rp 6,476,500.00
XII PEK.ORNAMEN DEPAN Rp 1,700,000.00
XIII PEK.PEMBERSIHAN Rp 500,000.00

REAL COST Rp 411,601,930.30

DIBULATKAN Rp 411,600,000.00

Terbilang : " Dua Ratus Enam Puluh Empat Juta Lima Ratus Ribu Rupiah"

Sorong, … Januari 2016

(……………...)
…………..
pembersihan 150.5
Bouplank 49.5

PONDASI
galian
Luas 0.3
pajang 36 3 3.5 75.25
10.5 13.5 8.75
Volume 22.575

pasir urug 40.5 31.5 72


volume 7.2

STRUKTUR
Sloof Ringnalk
Dimesi 0.0255 Dimesi 0.01
Panjang 75.25 Panjang 75.25
Volume 1.918875 Volume 0.7525

Kolom Kayu
Dimesi 0.01
volume 0.034
Total 0.782

kuda-kuda 1
panjang 1.8 2 3 5.25
2.7 2.7 3.5 3.5 24.45
volume 0.12225
taotal 0.2445

Kuda 2
panjang 2.23 2.4 3.4 3.4
1.9 1.9 6.75 8.92 30.9
volume 0.1545
taotal 0.4635 0.708

PONDASI
galian 0.14 0.21
Luas 0.35
pajang 36 3 3.5 75.25
10.5 13.5 8.75
volume 26.3375

batu bata 17 7.5 7.5 14 46


13.8

DINDING
wc
tinggi 3.4 32.3 tembok luar 2.25 luas pintu 1.5 3
panajng 9.5 4.5 1.6 12.8
panajng 65.75 223.55 jendela 0.69 2.76
dinging ku 22.225 15.1385 15.1385 52.502 276.052 1.5 3
Plester 260.9135 29.3 580.427 0.6 1.2
LANTAI 0.088 2.112
WC 2.625 5.25 21.872
dalam 40.5 31.5 72 66.75
Luar 14 5.25 5.25
14 1.5 1.5 41.5
keramik di 3 3 3.5 3.5 13
26

KUSEN
P1 P 5 P2 P 9.75
L 0.06 L 0.06
V 0.3 V 0.585
TOTAL 2.4 1.17

J1 P 7.8 J2 P 3.6
L 0.06 L 0.06
V 0.468 V 0.216
TOTAL 0.936 TOTAL 0.864

J3 P 3.42 BV P 1.1
L 0.06 L 0.06
V 0.2052 V 0.066
TOTAL 0.4104 TOTAL 1.584

7.3644

PINTU P 2 P 2
L 0.8 L 0.75
LUAS 1.6 LUAS 1.5
TOTAL 12.8 TOTAL 3

JENDELA P 1.14 P 1.1


L 0.62 L 0.5
LUAS 0.7068 LUAS 0.55
TOTAL 2.8272 TOTAL 1.1
3.9272

PLAFON 98

GORDING
P 56 40 70 166
V 0.996

ATAP
L 40 80 LISPLANK 30 28 58
16 64 17.4
144