Anda di halaman 1dari 133

Rumah Tipe 400m2 , Luas Tanah 1200m2

, Luas Tanah 1200m2


DAFTAR HARGA SATUAN UPAH
HARGA UPAH
NO URAIAN SATUAN UPAH
ORANG/JAM

1 Mandor org/Hari/8 jam Rp 10,625.00


2 Kepala Tukang Batu org/Hari/8 jam Rp 10,000.00
3 Kepala Tukang Kayu org/Hari/8 jam Rp 10,000.00
4 KepalaTukang Besi/Alumunium org/Hari/8 jam Rp 10,000.00
5 Kepala Tukang Cat/Pelitur org/Hari/8 jam Rp 10,000.00
6 Kepala Tukang Listrik org/Hari/8 jam Rp 10,000.00
7 Tukang Batu org/Hari/8 jam Rp 8,750.00
8 Tukang Kayu org/Hari/8 jam Rp 8,750.00
9 Tukang Besi/Baja org/Hari/8 jam Rp 8,750.00
10 Tukang Alumunium org/Hari/8 jam Rp 8,750.00
11 Tukang Cat org/Hari/8 jam Rp 8,750.00
12 Tukang Listrik org/Hari/8 jam Rp 8,750.00
13 Tukang Pipa org/Hari/8 jam Rp 8,750.00
14 Tukang Plitur org/Hari/8 jam Rp 8,750.00
15 Tukang Taman org/Hari/8 jam Rp 8,750.00
16 Tukang org/Hari/8 jam Rp 8,750.00
17 Pembantu Tukang org/Hari/8 jam Rp 8,375.00
18 Pekerja Biasa org/Hari/8 jam Rp 8,375.00
19 Penjaga Malam org/Hari/8 jam Rp 8,750.00
20 Supir org/Hari/8 jam Rp 8,750.00
21 Operator org/Hari/8 jam Rp 10,000.00
22 Mekanik org/Hari/8 jam Rp 10,000.00
23 Pembantu Supir org/Hari/8 jam Rp 8,375.00
24 Pembantu Operator org/Hari/8 jam Rp 8,375.00
25 Pembantu Mekanik org/Hari/8 jam Rp 8,375.00

Harga Sudah Termasuk Profit / Keuntungan


AH
HARGA UPAH

UPAH ORANG/HARI

Rp 85,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 70,000.00
Rp 70,000.00
Rp 70,000.00
Rp 70,000.00
Rp 70,000.00
Rp 70,000.00
Rp 70,000.00
Rp 70,000.00
Rp 70,000.00
Rp 70,000.00
Rp 67,000.00
Rp 67,000.00
Rp 70,000.00
Rp 70,000.00
Rp 80,000.00
Rp 80,000.00
Rp 67,000.00
Rp 67,000.00
Rp 67,000.00
DAFTAR HARGA SATUAN BAHAN / MATERIAL

NO URAIAN SAT. HARGA

A. AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug m3 181,230.00
2 Tanah Urug Pilihan m3 92,300.00
3 Sirtu m3 211,030.00
4 Pasir Teras m3 180,480.00
5 Pasir Pasang Kali m3 241,390.00
6 Pasir Beton m3 264,140.00
7 Abu Batu m3 267,800.00
8 Batu Gosok ( Apung ) kg 30,640.00
9 Batu Pecah Mesin 1/2 m3 231,240.00
10 Batu Pecah Mesin 2/3 m3 218,260.00
11 Batu Pecah Mesin 3/5 m3 211,970.00
12 Batu Pecah Mesin 5/7 m3 202,660.00
13 Batu Belah Pondasi m3 212,530.00
14 Batu Bronjol ( Untuk Bronjong ) m3 187,060.00
15 Batu Koral Beton Kali m3 178,600.00
16 Batu Tempel Hitam m3 100,110.00
17 Batu Pinggir Beton 10 x 20 x 35 bh 14,660.00
18 Batu Pinggir Beton 15 x 35 x 50 ( K-225 ) bh 76,230.00
19 Batu Telor m3 101,520.00
20 Batako Kecil 8 x 10 x 20 bh 2,500.00
21 Batako Besar 8 x 20 x 30 bh 2,700.00
22 Con Blok 8 x 20 x 40 bh 6,000.00
23 Bata Merah Bakar kelas I bh 850.00
24 Bata Merah Bakar kelas II bh 750.00
25 Bata Merah Oven ( Klingker ) bh 2,000.00
26 Roster Beton 20 x 20 bh 16,000.00
27 Roster Beton 30 x 30 bh 17,200.00
28 Grass Blok 20 x 20 bh 10,700.00
29 Grass Blok 30 x 30 m3 14,900.00
30 Paving Blok Natural 8 cm m3 89,300.00
31 Paving Blok Warna 8 cm m3 119,500.00
32 Paving Blok Natural 6 cm m3 83,600.00
33 Paving Blok Warna 6 cm m3 94,600.00
34 Canstin Paving Blok m1 38,400.00
35 Semen PC /50 kg zak 77,400.00
Semen PC kg 1,540.00
36 Semen Putih PC kg 1,958.00
37 Semen Putih zak 102,000.00
38 Kanstin Jalan Ukuran Besar ( Bina Marga ) 1bh =60cm bh 64,800.00
39 Readymix Beton K500, Tanpa Pompa ( Selang ) m3 1,386,000.00
40 Readymix Beton K400, Tanpa Pompa ( Selang ) m3 1,248,000.00
41 Readymix Beton K350, Tanpa Pompa ( Selang ) m3 1,220,000.00
42 Readymix Beton K300, Tanpa Pompa ( Selang ) m3 1,219,000.00
43 Readymix Beton K225, Tanpa Pompa ( Selang ) m3 1,165,000.00
44 Readymix Beton K175, Tanpa Pompa ( Selang ) m3 1,062,000.00
45 Kapur Pasang / Kapur Tembok m3 388,700.00
46 Kapur Sirih kg 20,200.00
47 Semen Warna kg 15,000.00
48 Tanah liat m3 34,500.00
49 Air ltr 350.00
50 Formite/spacer bh 2,800.00
51 Hollow/Con Blok 8 x 20 x 40 bh 5,700.00
52 Hollow/Con Blok 8 x 15 x 40 bh 6,500.00
53 Hollow/Con Blok 8 x 10 x 40 bh 3,500.00

B LABURAN,PENGISI DAN ALATNYA


1 Cat Genteng ltr 30,693.00
1 Plamir Tembok kg 27,500.00
2 Cat Tembok ICI Eksterior ( Beton ) lt 135,000.00
3 Cat Tembok ICI Interior ( Plafon Dan Dinding ) lt 82,500.00
4 Cat Tembok Vinilex kg 27,500.00
5 Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt 92,500.00
6 Cat Tembok Sanlek kg 22,500.00
7 Cat Dasar kg 35,000.00
8 Cat Tahan Asam lt 45,000.00
9 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) kg 100,000.00
10 Cat Marka / Spotlight kg 205,000.00
11 Water Profing Emulsion ml 80,000.00
12 Water Profing Membrance bh 68,000.00
13 Rool Cat Tembok bh 35,000.00
14 Kape Tembok bh 9,500.00
15 Kape Kayu 5 lt 10,500.00
16 Soligneum 1 Blek kg 26,000.00
17 Plincote kg 32,000.00
18 Penawetan Kayu m3 395,000.00
19 Pegopenan Kayu bh 390,000.00
20 Kwas 3" kg 16,500.00
21 Oker bks 23,500.00
22 Oyan bks 5,500.00
23 Oten ( Pewarna Plitur ) lt 6,000.00
24 Spirtus kg 17,500.00
25 Bahan Pelitur Kripik ( Sirlak India ) kg 115,000.00
26 Dempul Lilin kg 35,000.00
27 Dempul Plitur kg 40,000.00
28 Dempul Halus / Imfra ( Wood Filler ) lt 42,000.00
29 Dempul Jadi kg 40,000.00
30 Politur lt 55,000.00
31 Politur Jadi lt 125,000.00
32 Terpentin kg 21,000.00
33 Tiner A kg 26,300.00
34 Tiner B kg 23,700.00
35 Kumpon zak 34,000.00
36 Melamik kg 57,800.00
37 Dempul Plastik kg 43,200.00
38 Dempul Duco kg 40,000.00
39 Ampelas kg 5,500.00
40 Dempul Kayu Cap Kucing kg 26,900.00
41 Meni Kayu / Besi kg 33,500.00
42 Sincromat kg 45,000.00
43 Cat Kayu Glotex kg 45,900.00
43 Cat Kayu Pinotex kg 52,500.00
44 Cat Besi lt 48,400.00
45 Cat Besi Duco Danaglos / ICI kg 84,000.00
46 Cat Bron kg 74,500.00
47 Karet lis bh 3,700.00
Menie Besi kg 30,600.00
48 Minyak cat 42,300.00
Steger werk 1,000.00
49 Glass beet 55,500.00
50 Residu kg 9,000.00
kg
C BAHAN KAYU BERIKUT BAHAN JADINYA Ls
1 Bambu 5 s.d 7 kg 19,500.00
2 Bambu 7 s.d 10 lt 27,500.00
3 Bambu Gombong 42,500.00
4 Kayu Kamper Singkil / Kapur ( Kayu Samarinda kls II ) 7,805,000.00
5 Kayu Balok Borneo Super bt 5,810,000.00
6 Kayu Papan Borneo Super bt 6,155,500.00
7 Kayu Balok Kamper Medan (Kruing ) bt 6,262,000.00
8 Kayu Papan Kamper Medan (Kruing ) m3 6,405,800.00
9 Kayu Balok Kamper Banjar m3 7,000,000.00
10 Kayu Papan Kamper Banjar m3 7,310,000.00
11 Kayu Balok Kamper Samarinda m3 9,500,000.00
12 Kayu Papan Kamper Samarinda m3 9,596,800.00
13 Kayu Balok Rasamala m3 2,923,800.00
14 Kayu Jati Jatim Tua dia. 40 cm m3 22,850,000.00
15 Kayu Jati Jateng Tua dia. 40 cm m3 24,410,000.00
16 Kayu Jati Jabar Tua dia. 40 cm m3 15,000,000.00
17 Kayu Jati Jabar Tua dia. 40 cm kebawah m3 14,010,000.00
18 Kayu Hutan Kelas I ( Segeng,Mahoni, Laban ) m3 2,276,800.00
19 Kayu Balok Albasia m3 2,058,000.00
20 Kayu Papan Albasia m3 2,279,000.00
21 Dolken 5 s/d 7 m3 24,900.00
22 Dolken 7 s/d 10 m3 30,800.00
23 List Profil Kamper 1 cm m3 9,800.00
24 List Profil Kamper 2 cm m3 10,500.00
25 List Profil Kamper 4 cm bt 15,000.00
26 List Profil Kamper 5 cm bt 19,000.00
27 List Profil Kamper 10 cm m1 32,400.00
28 Pegangan Tangga Profil Jati m1 176,500.00
29 Pegangan Tangga Profil Kamper m1 135,000.00
30 Kayu Kaso 4/6 m1 3,049,500.00
31 Kayu Kaso 5/7 m1 3,692,500.00
32 Kayu Reng 2/3 Borneo Super m1 2,700.00
33 Kayu Reng 2/3 Kamper Banjar m1 3,500.00
34 Kayu Reng 3/4 Kamper Banjar m3 4,300.00
35 Kayu Papan Terentang m3 2,950,000.00
36 Kayu Balok Terentang m1 2,705,000.00
37 Kayu Perancah m1 1,209,000.00
38 Batang Kelapa m3 294,300.00
39 Tali Ijuk m3 25,800.00
40 Lapisan Ijuk tebal 10 cm m3 24,500.00
41 Venetion Blind m3 592,000.00
Vertical Blind 1 m2 5,250.00
42 Vertikal Blind bt 386,500.00
43 List Kayu 1/4 kayu Borneo kg 3,000.00
m2
D BAHAN PENUTUP RANGKA PLAFOND m2
1 Plafond Enternit 4 mm m2 18,500.00
2 Plafond hardpleks 5 mm 120 x 240 m1 68,700.00
3 Plafond Asbes Semen 5 mm 25,000.00
4 Plafond Asbes Semen 3,5 mm 21,500.00
5 Gypsum 120 x 240 t= 9 mm ex DN m2 87,800.00
6 Gypsum 120 x 240 t= 9 mm ex Luar lbr 92,200.00
7 Kompon Gypsum m2 47,700.00
7 Tepung Gypsum m2 13,800.00
8 Acustik Amstrong 30 x 60 lbr 70,000.00
9 Acustik Amstrong 60 x 120 lbr 146,500.00
10 Cotton Plester lbr 16,500.00
11 GRC board ( 120 x 240 x 4 ) mm kg 74,500.00
12 Cornice Coumpound lbr 83,000.00
13 List gypsum lbr 9,000.00
Kalsiplank uk. 3000x300x9 mm bh 65,800.00
lbr
E BAHAN KAYU LAPIS zak
1 Triplek 3 mm 120 x 240 m1 65,000.00
2 Triplek 4 mm 120 x 240 lbr 68,500.00
3 Triplek 4 mm ukuran Pintu 60,500.00
4 Triplek 6 mm 120 x 240 98,500.00
5 Triplek 9 mm 120 x 240 lbr 183,500.00
6 Jabar Wood 4 mm lbr 132,500.00
7 Bilik Bambu ( tanpa kulit ) lbr 22,500.00
8 Bilik Bambu ( dengan kulit ) lbr 25,000.00
9 Bilik Bambu Hitam Variasi lbr 37,700.00
10 Wall paper lbr 61,500.00
11 Multiplek 9 mm 120 x 240 m2 166,500.00
12 Multiplek 12 mm 120 x 240 m2 215,000.00
13 Multiplek 18 mm 120 x 240 m2 282,500.00
14 Playwood 18 mm 120 x 240 m2 357,500.00
15 Playwood 9 mm 120 x 240 lbr 260,000.00
16 Playwood 4 mm 120 x 240 lbr 145,000.00
17 Teakwood 3 mm 120 x 240 lbr 142,500.00
18 Teakwood 4 mm 120 x 240 m3 145,000.00
19 Teakwood 3 mm 120 x 240 ukuran Pintu lbr 140,000.00
20 Teakwood ukuran Pintu 4 mm lbr 127,500.00
21 Tacon ( Tahan Bakar ) lbr 142,500.00
22 Supercon lbr 61,500.00
23 Melamin 4 mm 120 x 240 lbr 98,500.00
24 Melamin TOK 4 mm lbr 147,000.00
25 Formika 120 x 240 m2 175,000.00
26 Formika ukuran Pintu m2 147,500.00
27 Formika Warna 4" x 8" lbr 262,500.00
27 HPL lbr 175,000.00
lbr
F BAHAN LANTAI DAN PELAPIS DINDING lbr
1 Tegel PC 20 x 20 lbr 3,800.00
2 Plin Tegel PC 10 x 20 lbr 2,700.00
3 Tegel PC 30 x 30 3,800.00
4 Plin Tegel PC 15 x 30 3,000.00
5 Tegel Warna 20 x 20 bh 4,000.00
6 Plin Tegel Warna 10 x 20 bh 3,600.00
7 Tegel Warna 30 x 30 bh 6,000.00
8 Plin Tegel Warna 15 x 30 bh 6,500.00
9 Tegel Wafel PC 20 x 20 bh 3,500.00
10 Tegel Wafel Warna 20 x 20 bh 2,700.00
11 Tegel Badak PC 30 x 30 bh 4,300.00
12 Porcelaint uk.11 x 11cm bh 1,600.00
12 Poslin 11 x 11 Warna Standar DN bh 70,000.00
13 Poslin 11 x 11 Warna khusus DN bh 75,000.00
14 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia bh 60,000.00
15 Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Mulia bh 62,500.00
16 Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia m2 65,000.00
17 Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia m2 60,000.00
18 Keramik 20 x 25 Dinding KM KW I DN Corak Mulia m2 65,000.00
19 Keramik 30 x 30 KWI DN Putih Polos Mulia m2 55,500.00
20 Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia m2 60,500.00
21 Keramik 40 x 40 KWI DN Putih Polos Mulia m2 67,500.00
22 Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia m2 66,000.00
23 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman m2 65,500.00
24 Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Roman m2 80,000.00
25 Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman m2 83,000.00
26 Keramik 20 x 20 (KM) KW I DN Putih Polos Roman m2 81,500.00
27 Keramik 20 x 25 Dinding KM KW I DN Corak Roman m2 81,500.00
27 Keramik 20 x 40 Dinding KM KW I DN Corak Roman m2 83,000.00
28 Keramik 20 x 25 KW I DN Putih Polos Roman m2 76,000.00
28 Keramik 30 x 30 KW I DN Polos Roman m2 76,000.00
29 Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman m2 80,000.00
30 Keramik 40 x 40 KW I DN Polos Roman m2 80,000.00
31 Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman m2 85,000.00
32 Vinyl Lantai Standar m2 65,500.00
33 Karpet Kelas Baik LN m2 1,128,500.00
34 Karpet Kelas Sedang LN m2 389,000.00
35 Parquet Jati m2 413,500.00
36 Stairnosing Keramik 10/20 m2 15,500.00
37 Stairnosing Fiber m2 25,000.00
38 Taraso Kerang 30 x 30 m2 35,000.00
39 Plin Taraso 10 x 30 m2 15,000.00
40 Granit Alam LN Ukuran Besar bh 2,033,500.00
41 Granit Alam LN Ukuran Kecil m 1,774,500.00
42 Granit Alam DN Ukuran Besar m2 1,464,500.00
43 Granit Alam DN Ukuran Kecil bh 1,429,500.00
44 Granito Tile Essenza Ukuran 40 x 40 Polis m2 380,000.00
45 Granito Tile Essenza Ukuran 30 x 30 m2 355,500.00
46 Granito Tile Essenza Ukuran 40 x 40 UnPolis m2 225,500.00
47 Marmer m2 605,000.00
48 Marmer Alam Lampung Ukuran Besar m2 605,500.00
49 Marmer Alam Lampung Ukuran kecil m3 380,500.00
50 Marmer Alam Citatah Ukuran Besar m2 375,000.00
51 Marmer Alam Citatah Ukuran Kecil m2 262,500.00
52 Marmer Sintetis m2 175,000.00
53 Granito Tile Essenza 60 x 60 Polis m2 395,000.00
54 Granito Tile Essenza 60 x 60 UnPolis m2 255,000.00
55 Batu Tempel Hitam m2 106,500.00
56 Bata Karawang m2 650.00
57 Campuran untuk Kedap Air ( AM ) M2 41,500.00
58 Plint keramik 10 x 20 M2 3,500.00
59 Plint keramik 10 x 25 m2 4,000.00
60 Plint keramik 10 x 30 bh 4,000.00
61 Plint keramik 10 x 40 ltr 4,500.00
62 Plint keramik 15 x 30 bh 5,000.00
63 Plint keramik 15 x 40 bh 5,500.00
64 Plint granito 10 x 30 bh 2,000.00
65 Plint granito 10 x 40 bh 2,200.00
66 Plint granito 15 x 30 bh 2,500.00
67 Plint granito 15 x 40 bh 3,000.00
Puzzdith - 100 XR bh 0.00
bh
G BAHAN SALURAN AIR KOTOR / BERSIH bh
1 Grafel U 20 cm' bh 48,000.00
2 Grafel U 30 cm' ltr 60,000.00
3 Grafel U 40 cm' 79,000.00
4 Buis Beton 20 cm ( 1 M' ) 53,000.00
5 Buis Beton 30 cm ( 1 M' ) m1 68,000.00
6 Buis Beton 40 cm ( 1 M' ) m1 85,000.00
7 Buis Beton 50 cm ( 1 M' ) m1 98,000.00
8 Buis Beton 60 cm ( 1 M' ) m1 135,000.00
9 Buis Beton 100 cm ( 0.50 M' ) m1 310,000.00
10 Buis Beton 80 cm ( 0.50 M' ) m1 305,000.00
11 BuisTanah 10 cm ( 0.50 M' ) stk 10,000.00
12 BuisTanah 15 cm ( 0.50 M' ) stk 13,000.00
13 BuisTanah 20 cm ( 0.50 M' ) stk 17,000.00
14 BuisTanah 25 cm ( 0.50 M' ) stk 23,500.00
15 Injuk stk 18,000.00
stk
H BAHAN LOGAM DAN BAHAN JADINYA stk
1 Besi Beton U-24 Rata-rata stk 16,500.00
2 Besi Beton U-39 / U-32 Rata-rata kg 22,800.00
3 Pagar BRC lengkap tiang ( Tanpa Pondasi ) 188,500.00
4 Bondek 203,500.00
5 Besi WF Ex DN SII kg 26,400.00
6 Besi WF Ex Jepang kg 26,300.00
7 Besi Profil DN SII m2 20,200.00
8 Besi Profil Ex LN m2 23,800.00
9 Besi C Lip Chanel kg 21,200.00
10 Ongkos Galfanis Besi kg 11,700.00
11 Kawat Beton kg 30,500.00
12 Kawat Duri kg 70,000.00
13 Kawat Pengikat kg 1,100.00
14 Kawat Bronjong 4 mm kg 31,100.00
15 Kawat Tembaga kg 45,600.00
16 Kain Kasa kg 35,500.00
17 Ram Nyamuk Hijau m1 14,800.00
18 Ram Kawat 1 x 1 cm kg 16,000.00
19 Ram Ayam kg 15,500.00
Kawat Kasa m2 35,500.00
20 Kawat Kasa 1 x 1 ( Putih ) kg 35,500.00
21 Kawat Harmonika 4 cm Lapis Plastik m2 80,000.00
22 Kawat Harmonika 4 cm m2 37,000.00
23 Kawat Seng Polos m2 20,300.00
24 Kawat Harmonika 2 cm m2 31,500.00
25 Kawat Las Listrik m2 26,000.00
26 Wiremesh M8 m2 57,500.00
27 Wiremesh M6 kg 42,600.00
28 Timah m2 51,000.00
29 Timah Hitam kg 47,700.00
30 Ram nyamuk Alumunium m2 35,700.00
31 Plat Srip Ø 2 x 30 mm ( 6 m1 ) m2 36,300.00
32 Plat Srip Ø 3 x 30 mm ( 6 m1 ) kg 36,500.00
33 Plat Strip kg 20,100.00
34 Besi Strip m2 29,500.00
Kunci Lemari bh 55,500.00
35 Plat Alumunium 0.2 mm bt 98,800.00
36 Plat Alumunium 0.3 mm bt 122,000.00
37 Plat Alumunium 0.4 mm bt 155,600.00
38 Plat Alumunium 0.5 mm kg 157,500.00
39 Plat Alumunium 0.6 mm m2 189,000.00
40 Plat Alumunium 0.1 mm m2 62,000.00
41 Kusen Alumunium Natural 1.3 mm t= 103 mm ( 4 " ) m2 166,500.00
42 Kusen Alumunium Warna 1.3 mm t= 103 mm ( 4 " ) m2 179,500.00
43 Kusen Alumunium Natural 1.3 mm t= 103 mm ( 3 " ) m2 89,100.00
Kusen pintu/jendela alumunium 3" m2 612,100.00
Kusen Alumunium Warna 4" m' 125,000.00
44 Kusen Alumunium Warna 1.3 mm t= 103 mm ( 3 " ) m2 112,200.00
45 Daun Jendela Alumunium Natural ( tanpa kaca dan accessories ) m1 108,700.00
46 Daun Jendela Alumunium Warna ( tanpa kaca dan accessories ) m1 98,800.00
47 Daun Pintu Alumunium Natural ( tanpa kaca dan accessories ) m1 233,000.00
48 Daun Pintu Alumunium Warna ( tanpa kaca dan accessories ) m1 211,800.00
49 Handle Alumunium ( Tarikan Pintu Alumunium ) m2 379,800.00
50 Kait Angin Alumunium m2 115,000.00
51 Karet Asisoris Kusen / Pintu Alumunium m2 8,300.00
52 Jalusi Alumunium m2 38,500.00
53 Sunscreen Almunium bh 418,300.00
54 Seng Gelombang BJLPS 0,25mm x 180cm ps 58,120.00
55 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 ) m1 1,740,000.00
56 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) m1 228,500.00
57 Plat Besi Tipis 1 mm m2 18,500.00
58 Plat Besi Tipis 0.5 mm lbr 19,500.00
59 Plat Besi 2 mm s/d 5 mm roll 15,600.00
60 Plat Besi 6 mms/d 10 mm roll 15,600.00
61 Profil alumunium "T" kg 98,800.00
62 Plat Besi 10 mm keatas kg 16,200.00
63 Kabel presstressed polos kg 29,400.00
64 Jaring Kawat Baja kg 31,800.00
65 Lem Kuning ( Aibond ) m' 39,300.00
Sealant karet Kusen 36,000.00
66 Lem Fox kg 26,300.00
67 Lem Vinyl kg 48,500.00
68 Besi Strip Kaca Nako kg 12,100.00
69 Profil alumunium "T" kg 13,500.00
70 Besi Hallow ( 2 x 4 x 4 cm ) kg 25,000.00
71 Besi Hallow ( 4 x 4 cm ) kg 32,200.00
72 Besi Rail Pengamanan kg 505,300.00
73 Jendela Besi m1 429,300.00
74 Jendela Besi tahan api btg 551,900.00
Rel Pintu dorong bh 220,600.00
Rolling Door Alumunium Besi m2 414,800.00
Pintu Alumunium - swing + door closed m2 2,356,300.00
75 Pintu gulung besi btg 551,900.00
76 Pintu Roliing Door kg 337,300.00
77 Jendela nako kaca ryben + tralis 6 klip m2 187,000.00
78 Jendela nako kaca ryben + tralis 7 klip m2 220,000.00
79 Jendela nako kaca ryben + tralis 8 klip m2 253,000.00
80 Jendela nako kaca ryben + tralis 10 klip m2 319,000.00
81 Jendela nako kaca bening + tralis 4 klip set 132,000.00
82 Jendela nako kaca bening + tralis 5 klip set 154,000.00
83 Jendela nako kaca bening + tralis 6 klip set 187,000.00
84 Jendela nako kaca bening + tralis 7 klip set 231,000.00
85 Jendela nako kaca bening + tralis 8 klip set 253,000.00
86 Jendela nako kaca bening + tralis 10 klip set 330,000.00
set
I BAHAN KACA set
1 Kaca Polos 2 mm ( ASAHI ) set 75,900.00
2 Kaca Polos 3 mm ( ASAHI ) set 96,200.00
3 Kaca Polos 5 mm ( ASAHI ) 122,100.00
4 Kaca Polos 8 mm ( ASAHI ) 201,500.00
5 Kaca Rayband 5 mm ( ASAHI ) m2 163,600.00
6 Kaca Rayband 8 mm ( ASAHI ) m2 355,800.00
7 Kaca Rayband 12 mm ( ASAHI ) m2 689,700.00
Kaca Buram 12mm m2 432,000.00
8 Kaca cermin 5 mm m2 165,600.00
9 Kaca cermin 6 mm m2 205,100.00
10 Kaca cermin 8 mm m2 257,800.00
11 Kaca Patri Lokal Terpasang ( ASAHI ) m2 1,783,300.00
12 Kaca Patri Ex Luar Negeri Terpasang m2 3,768,300.00
13 Kaca 6 mm Gravver m2 1,390,300.00
14 Glass Block DN 20 x 20 ( Kedawung ) m2 24,200.00
15 Glass Block DN 20 x 20 Ex LN m2 138,300.00
Sealant 1 kg 65,000.00
Sealant karet Kusen m' 2,500.00
16 Sealant m2 233,000.00
17 Jendela Nako m2 120,200.00
bh
J BAHAN PAKU DAN MUR BAUT bh
1 Paku ½ s/d 2 cm kg 24,000.00
2 Paku 2 cm s/d 5 cm bh 24,000.00
3 Paku 8 cm s/d 15 cm kg 18,400.00
4 Paku Beton 2 cm s/d 5 cm kg 1,700.00
5 Paku Kait Lengkap kg 1,000.00
6 Paku Cacing kg 63,000.00
7 Besi Beugel Kuda - Kuda kg 24,000.00
8 Duk Angker bh 8,300.00
9 Angker Mur Baut dia. 19 / Panjang 60 cm bh 79,000.00
10 Mur Baut HTB dia. 19 s/d 16 ( 5 cm ) kg 17,500.00
11 Mur Baut Biasa dia. 19 s/d 16 ( 5 cm ) kg 10,300.00
12 Piser dia.12 s/d 20 cm bh 5,500.00
13 Paku skrup 3" bh 850.00
14 Ramset / Dinabolt bh 8,000.00
15 Baut Besar bh 700.00
16 Baut Kecil bh 300.00
17 Paku GRC bh 38,500.00
18 Paku Gypsum bh 18,500.00
19 Sekrup fixer bh 300.00
20 Paku Payung 5cm bh 14,000.00
kg
K BAHAN PERPIPAAN kg
1 Besi Pipa Galvanis 0,5 Inch bh 32,700.00
2 Besi Pipa Galvanis 1 Inch kg 65,700.00
3 Besi Pipa Galvanis 2 Inch 134,600.00
1 Besi Pipa Untuk Hydrant BSP 1" 183,500.00
2 Besi Pipa Untuk Hydrant BSP 1.25" m1 231,300.00
3 Besi Pipa Untuk Hydrant BSP 1.5" m1 327,800.00
4 Besi Pipa Untuk Hydrant BSP 2" m1 387,000.00
5 Besi Pipa Untuk Hydrant BSP 2.5" bt 483,500.00
6 Besi Pipa Untuk Hydrant BSP 3" bt 654,500.00
7 Besi Pipa Untuk Hydrant BSP 4" bt 956,600.00
8 Besi Pipa Untuk Hydrant BSP 6" bt 1,565,800.00
9 Besi Pipa Hitam 1" t = 2 mm bt 189,600.00
10 Besi Pipa Hitam 2" t = 2 mm bt 250,700.00
11 Besi Pipa Hitam 3" t = 2mm bt 402,500.00
12 Besi Pipa Hitam 4" t = 2 mm bt 630,500.00
13 Besi Pipa Hitam 6" t = 2 mm bt 850,000.00
14 Pipa GIP Medium A 1/2" ( 6 m1 ) bt 120,500.00
15 Pipa GIP Medium A 3/4" ( 6 m1 ) bt 175,500.00
16 Pipa GIP Medium A 1" ( 6 m1 ) bt 199,700.00
17 Pipa GIP Medium A 1 1/4" ( 6 m1 ) bt 285,500.00
18 Pipa GIP Medium A 1 1/2" ( 6 m1 ) bt 308,600.00
19 Pipa GIP Medium A 1 3/4" ( 6 m1 ) bt 359,100.00
20 Pipa GIP Medium A 2" ( 6 m1 ) bt 514,200.00
21 Pipa GIP Medium A 2 1/2" ( 6 m1 ) bt 739,500.00
22 Pipa GIP Medium A 3" ( 6 m1 ) bt 934,900.00
23 Pipa GIP Medium A 4" ( 6 m1 ) bt 950,000.00
24 Macam2 Sambungan GIP 1/2" bt 7,000.00
25 Macam2 Sambungan GIP 3/4" bt 9,500.00
26 Macam2 Sambungan GIP 1" bt 18,500.00
27 Macam2 Sambungan GIP 1 1/4" bt 21,800.00
28 Macam2 Sambungan GIP 1 1/2" bh 23,000.00
29 Macam2 Sambungan GIP 1 3/4" bh 25,000.00
30 Macam2 Sambungan GIP 2" bh 56,500.00
31 Macam2 Sambungan GIP 2 1/2" bh 66,500.00
32 Macam2 Sambungan GIP 3" bh 83,500.00
33 Macam2 Sambungan GIP 4" bh 130,500.00
34 Pipa PVC RUCIKA type AW 1/2" bh 42,500.00
35 Pipa PVC RUCIKA type AW 3/4" bh 55,500.00
36 Pipa PVC RUCIKA type AW 1" bh 65,000.00
37 Pipa PVC RUCIKA type AW 1 1/4" bh 82,500.00
38 Pipa PVC RUCIKA type AW 1 1/2" bt 110,000.00
39 Pipa PVC RUCIKA type AW 2" bt 120,000.00
40 Pipa PVC RUCIKA type AW 2 1/2" bt 170,000.00
41 Pipa PVC RUCIKA type AW 3" bt 215,000.00
42 Pipa PVC RUCIKA type AW 4" bt 360,000.00
43 Pipa PVC RUCIKA type AW 6" bt 675,000.00
44 Pipa PVC RUCIKA type AW 8" bt 850,000.00
45 Pipa PVC MASPION ABU ( AW ) 1/2" bt 25,000.00
46 Pipa PVC MASPION ABU ( AW ) 3/4" bt 28,500.00
47 Pipa PVC MASPION ABU ( AW ) 1" bt 42,500.00
48 Pipa PVC MASPION ABU ( AW ) 1 1/4" bt 60,500.00
49 Pipa PVC MASPION ABU ( AW ) 1 1/2" bt 61,500.00
50 Pipa PVC MASPION ABU ( AW ) 2" bt 80,000.00
51 Pipa PVC MASPION ABU ( AW ) 2 1/2" bt 130,500.00
52 Pipa PVC MASPION ABU ( AW ) 3" bt 155,000.00
53 Pipa PVC MASPION ABU ( AW ) 4" bt 265,000.00
54 Macam2 Sambungan Paralon 1/2" bt 4,700.00
55 Macam2 Sambungan Paralon 3/4" bt 5,000.00
56 Macam2 Sambungan Paralon 1" bt 5,500.00
57 Macam2 Sambungan Paralon 1 1/4" bt 8,000.00
58 Macam2 Sambungan Paralon 1 1/2" bh 10,500.00
59 Macam2 Sambungan Paralon 1 3/4" bh 15,000.00
60 Macam2 Sambungan Paralon 2" bh 17,500.00
61 Macam2 Sambungan Paralon 2 1/2" bh 29,500.00
62 Macam2 Sambungan Paralon 3" bh 33,000.00
63 Macam2 Sambungan Paralon 4" bh 38,000.00
64 Sambungan Pipa PVC Jenis AW 4" TY bh 99,000.00
65 Lem Paralon bh 10,500.00
66 Solatip Ledeng bh 4,500.00
67 Pipa PVC 4" Berlobang Jenis AW bh 40,500.00
68 PVC Waterstop lebar 150 bh 55,000.00
69 PVC Waterstop lebar 200 tb 60,000.00
70 PVC Waterstop lebar 230 gl 70,000.00
71 PVC Waterstop lebar 250 m1 76,000.00
72 PVC Waterstop lebar 300 m1 87,500.00
73 PVC Waterstop lebar 320 m1 95,000.00
m1
L BAHAN SANITAIR m1
1 Stop Kran 3/4" KIT m1 115,000.00
2 Stop Kran 1" KIT m1 137,500.00
3 Stop Kran 1 1/2" KIT 230,000.00
4 Stop Kran 2" KIT 295,000.00
5 Stop Kran 2 1/2" KIT bh 785,000.00
6 Stop Kran 3" KIT bh 915,000.00
7 Check Valve 1/2" bh 95,500.00
8 Double Neple 1/2" bh 36,000.00
9 Water Mur 1/2" bh 44,500.00
10 Gate walve 1/2" bh 61,500.00
11 Saringan Air Lt. KM Stainless Steel/Floor Drain bh 73,500.00
12 Apooer Bath Tube bh 295,000.00
13 Kran Stainless Lokal Kait bh 51,500.00
14 Shower Dengan Tiang bh 245,000.00
15 Shower Tanpa Tiang bh 150,000.00
16 Kran Tembok Sun Eui dia. 1/2" bh 55,000.00
17 Kran Tembok ITAP dia. 1/2" bh 45,000.00
18 Kran Bebek Sun Eui 1/2" bh 160,000.00
19 Kran Bebek ITAP 1/2" bh 57,500.00
20 Kran Panas Dingin San Eui Standard bh 252,000.00
21 Bath Cape Washteren bh 2,310,000.00
22 Tempat Sabun Poslin bh 51,500.00
23 Wastafel Lengkap TOTO LW 230 bh 1,115,000.00
24 Wastafel Lengkap INA bh 800,000.00
25 Closet Jongkok Poslin Warna TOTO unit 227,500.00
26 Closet Jongkok Standard Putih Poslin TOTO bh 207,500.00
27 Closet Jongkok Lengkap Sistem Jet TOTO unit 2,236,500.00
28 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 1,897,500.00
29 Wastafel Bulat Warna Standard Lengkap unit 1,002,000.00
30 Closet Duduk Warna Standard INA Lengkap unit 1,399,500.00
31 Urinoir Lengkap TOTO Warna Standard Lengkap unit 1,952,500.00
32 Penyekat Poslin Urinoar TOTO unit 545,500.00
33 Kitchen Zink Stainless Standard Lokal ( 1 Lubang ) unit 438,500.00
34 Kitchen Zink Stainless Non Standard Franke ( 1 Lubang ) bh 1,400,000.00
35 Kitchen Zink Stainless Non Standard Franke ( 2 Lubang ) unit 1,815,500.00
36 Talang PVC U - 15 cm lbr 66,000.00
bh
M BAHAN PENUTUP ATAP bh
1 Atap Plastik Gelombang 80 x 180 bh 36,500.00
2 Atap Fiber Glass Tipis 80 x 180 ( Gelombang ) btg 52,000.00
3 Atap Fiber Glass Tebal 80 x 180 ( Gelombang ) 110,000.00
4 Atap Alumunium Natural USR 26 ( JAINDO ) 155,000.00
5 Atap Alumunium Warna USR 26 ( JAINDO ) lbr 182,500.00
6 Atap Asbes Gel. Kecil 80 x 180 x 4 mm lbr 85,000.00
7 Atap Asbes Gel. Besar 80 x 180 x 5 mm lbr 122,500.00
8 Atap Seng Gelombang 80 cm x 180 cm x 3 mm m2 69,500.00
9 Atap Seng Gelombang 80 cm x 180 cm x 5 mm m2 91,500.00
10 Atap Seng Gelombang 270 cm x 105 cm x 4mm lbr 81,000.00
11 Atap Seng Gelombang 240 cm x 105 cm x 4mm lbr 72,500.00
12 Atap Seng Gelombang 210 cm x 105 cm x 4mm lbr 65,500.00
13 Atap Seng Gelombang 150 cm x 105 cm x 4mm lbr 47,000.00
14 Atap Seng Gelombang 150 cm x 102 cm x 5mm lbr 86,500.00
15 Atap Seng Gelombang 180 cm x 102 cm x 5mm lbr 107,500.00
16 Atap Gelombang 300 cm x 105 cm x 4 mm lbr 88,000.00
17 Atap Tegola Kubota, lengkap lbr 536,000.00
18 Atap Tegola Kwalitas Sedang lbr 312,000.00
19 Alumunium Foile lbr 20,000.00
20 Atap Genteng Plentong pres Bakar KW I lbr 2,000.00
21 Atap Genteng Plentong pres Molen Oven KW I m2 3,000.00
22 Atap Genteng Flam pres Molen Oven Jatiwangi m2 2,500.00
23 Bubung Genteng pres Bulat Ex Jatiwangi m2 8,500.00
24 Genteng Bubungan Ex Jatiwangi Segi Tiga bh 5,000.00
25 Genteng Bubungan Beton bh 11,000.00
26 Genteng Metal ( Rainbow Roof ) bh 225,000.00
27 Genteng Metal Hana bh 190,000.00
28 Nok Atas Metal ( Rainbow Roof ) bh 152,500.00
29 Nok Atas Metal Hana bh 89,000.00
30 Nok Pingir Metal ( Rainbow Roof ) m2 115,900.00
31 Nok Pingir Metal Hana m2 110,900.00
32 Wall Flasing ( Rainbow Roof ) m2 92,300.00
33 Wall Flasing Hana lbr 97,600.00
34 Atap Genteng Beton Warna 14.5/m2 lbr 106,500.00
35 Genteng Beton Natural lbr 9,000.00
36 Sirap Kelas I ( 80 / m2 ) lbr 27,500.00
37 Genteng Keramik Natural Intan 14.5 / m2 lbr 115,000.00
38 Genteng Keramik Glasur Standard 14.5 /m2 m2 145,500.00
39 Genteng Keramik Glasur Special 14.5 /m2 m2 147,000.00
40 Genteng Keramik Glasur Premium 14.5 /m2 bh 150,000.00
41 Genteng Murando Natural 1m2 = 20 bh m2 3,000.00
42 Genteng Murando Glasur 1m2 = 20 bh m2 4,500.00
43 Bubung Murando Natural m2 8,500.00
44 Bubung Murando Glasur m2 12,000.00
45 Bubungan Genteng Keramik bh 11,000.00
46 Atap Genteng Kodok bh 3,500.00
47 Bubungan Genteng Kodok bh 5,000.00
48 Bubungan Genteng Plentong bh 6,500.00
49 Bubungan Stel Gelombang bh 8,000.00
50 Nok Stel Gelombang bh 39,000.00
51 Nok Atap Seng bh 41,500.00
52 Nok Standar 40 cm 18, SWG 22 bh 78,500.00
53 Pelat Asbes tebal 4 mm bh 22,500.00
54 Pelat Asbes tebal 3.5 mm lbr 17,500.00
55 Trusses ZAM-75 t=0.8 Rangka Utama lbr 38,500.00
56 Trusses ZAM-75 t=0.5 Rangka Utama m2 23,000.00
57 Reng 16-DB Roof Battens t=0.48 mm lbr 11,500.00
58 Foot Plate t= 1.22 mm lbr 8,000.00
59 PLD - Diafragma Plate m1 2,500.00
60 WIND Bracing m1 2,000.00
61 Tensioner ( Pengaku Tali angin ) m1 8,000.00
62 Nok Pinggir Morando Natural m1 4,000.00
62 Waterproofing membrance tb. 3 mm bh 100,000.00
m1
N BAHAN MEKANIKAL bh
1 Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW ) bh 78,536,500.00
2 Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW ) m2 237,995,000.00
3 Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW ) 650,812,000.00
4 Presure Tank kap. 500 liter lengkap 40,698,000.00
5 Hydran Box dlm Gedung ( Lengkap ) unit 7,540,000.00
6 Fire House 1.5 x 30 m + nose unit 5,353,000.00
7 Exhose Fan H 360 W 60 x 60 cm unit 7,550,000.00
8 Exhose Fan H 380 W CFM 55 x 55 cm unit 6,040,500.00
9 Exhose Fan H 100 W 40 x 40 cm unit 1,212,500.00
10 AC Split 3 PK Setara TOSHIBA unit 33,871,500.00
11 AC Split 2 PK Setara TOSHIBA unit 24,119,500.00
12 AC Split 1 PK Setara TOSHIBA unit 5,692,000.00
13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) unit 5,000,000.00
unit
O BAHAN ELEKTRIKAL unit
1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' ) unit 105,000.00
2 Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' ) 1 BTU 155,000.00
3 Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' ) 7,000.00
4 Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' ) 8,000.00
5 Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' ) ROLL 5,000.00
6 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' ) ROLL 11,500.00
7 Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' ) m' 8,000.00
8 Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' ) m' 6,500.00
9 Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' ) m' 16,000.00
10 Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' ) m' 21,500.00
11 Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' ) m' 12,500.00
12 Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' ) m' 14,500.00
13 Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' ) m' 20,500.00
14 Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' ) m' 19,500.00
15 Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' ) m' 132,500.00
16 Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' ) m' 27,500.00
17 Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' ) m' 31,500.00
18 Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' ) m' 13,000.00
19 Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' ) m' 21,500.00
20 Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' ) m' 26,500.00
21 Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' ) m' 15,000.00
22 Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' ) m' 21,500.00
23 Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' ) m' 20,500.00
24 Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' ) m' 22,500.00
25 Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' ) m' 28,500.00
26 Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' ) m' 39,500.00
27 Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' ) m' 46,500.00
28 NSFB FUJI EA - 100 A m' 926,500.00
29 NSFB FUJI EA - 150 A m' 2,201,000.00
30 Rumah Panel 30 x 60 cm ( Kosong ) m' 169,500.00
31 Skring Kas 2 grop Biasa m' 225,500.00
32 Skring Kas 3 grop Biasa bh 245,000.00
33 Skring Kas 5 grop Biasa bh 516,000.00
34 MCB 1 PAS unt 61,500.00
35 MCB 3 PAS unt 117,500.00
36 Tahanan 50 A Merk Fuji unt 573,500.00
37 Saklar Broko Tunggal Standard ( 1 Phase ) unt 26,500.00
38 Saklar Broko Seri Standard ( 1 Phase ) bh 29,000.00
39 Stop Kontak Broko Standard ( 1 Phase ) bh 26,500.00
40 Stop Kontak Broko 3 Phase (Out Bow) bh 96,500.00
41 Stop Kontak Broko 3 Phase ( In Bow) bh 160,000.00
42 Stop Kontak Handle 3 Phase bh 97,500.00
43 Instalas Titik Lampu / Stop Kontak (Upah dan Alat) bh 198,000.00
44 Lampu pijar 25 Watt s/d 100 Watt bh 67,500.00
45 Lampu Neon Phillips 20 Watt bh 33,000.00
46 Lampu Neon Phillips 40 Watt bh 39,000.00
47 Trapo TL 20 W (Phillips) ttk 46,000.00
48 Trapo TL 40 W (Phillips) bh 42,500.00
49 Trapo TL 20 W (Sinar) bh 45,000.00
50 Trapo TL 40 W (Sinar) bh 45,500.00
51 Stater Neon Phillips bh 9,500.00
52 Stater Neon Biasa bh 7,500.00
53 Rumah TL In Bow / Out Bow 2 x 20 W (kosongan) bh 158,500.00
54 Down Light + SL 25 W bh 125,000.00
55 Lampu SL Philip 25 W bh 50,000.00
56 Lampu Sirkel TL 20 W Lengkap bh 75,000.00
57 Lampu Mercuri 80 W bh 163,000.00
58 Lampu Taman + Tiang + Lampu 1 Buah bh 338,500.00
59 Lampu Baret 30 cm + Neon bh 245,000.00
60 Lampu Neon Arcrilik 2 x 40 W Lengkap bh 812,000.00
61 Jarum Penangkal Petir 16 bh 112,000.00
62 Kawat BC ( Tembaga ) bh 72,500.00
63 Pentanahan Penangkal Petir bh 466,500.00
64 Pentanahan Panel bh 326,000.00
bh
P BAHAN ALAT PENGANTUNG DAN KUNCI kg
Kunci Tanam Kamar Mandi bh 63,500.00
1 Kunci Silinder ALFA untuk Pintu Alumunium ttk 452,500.00
2 Tarikan Pintu Alumunium ttk 450,000.00
3 Kunci 2 Slaag ROYAL 139,500.00
4 Rel Henderson Lengkap 951,000.00
Kunci Antik bh 150,000.00
5 Rel maraton I Pintu bh 212,500.00
6 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 bh 369,500.00
7 Kunci 2 Slaag Ancor Asli bh 182,500.00
8 Kunci 2 Slaag ISO bh 228,500.00
9 Kunci KM Bulat Kualitas Biasa unt 59,900.00
10 Kunci kM Bulat ALFA bh 113,100.00
11 Kunci 2 Slaag Silinder Utama Standard bh 645,300.00
12 Kunci Gembok Besar bh 93,800.00
13 Kunci 2 Slaag Kuda Terbang bh 104,000.00
14 Kunci Lemari bh 51,500.00
15 Espangolet bh 56,800.00
16 Grendel 15 cm bh 54,800.00
17 Grendel 5 cm bh 6,000.00
18 Hak Angin Kait Jendela Biasa bh 8,000.00
19 Hak Angin Jendela Antik ps 31,900.00
20 Hak Angin Sendok Stainless / Kuningan bh 35,500.00
21 Sloot Pintu Berikut Rantai bh 35,000.00
22 Sloot Jendela Tunggal ps 36,300.00
23 Engsel Pintu Unilon Standard ps 23,100.00
24 Engsel Jendela Unilon bh 16,500.00
25 Engsel Patrun bh 15,100.00
26 Engsel Harmonika bh 10,100.00
Pintu type PVC unit 350,000.00
27 Door Closer Kelas Standard ( Kelas Sedang ) ps 462,000.00
28 Door Closer Kelas Standard ( Kelas Baik ) ps 657,300.00
29 Door Closer Kelas Rendah ps 220,000.00
30 Door Holder m1 226,000.00
31 Door Stoper unt 281,500.00
32 Tarikan Almari Rata-rata unt 21,500.00
33 Seng BJLS 30 Lebar 60 cm ( 1 rol 50 m' ) unt 48,000.00
34 Seng BJLS 30 Lebar 90 cm ( 1 rol 50 m' ) unt 59,000.00
35 Seng BJLS 30 / 3 x 0.3 mm unt 96,500.00
36 Seng Plat 3' x 6' BJLS 30 bh 55,500.00
37 Waterstop Lebar 200 mm m1 64,500.00
38 Waterstop Lebar 150 mm m1 57,000.00
lbr
Q BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN lbr
1 Hotmix jadi berikut alat dan bahan bakar ( T=5 cm => 9 m2 ) m1 1,483,500.00
2 Aspal (ESO) 1 Drum 155 kg m1 13,800.00
3 Aspal Curah 12,000.00
4 Aspal RC 70 ( Cilacap ) 12,000.00
5 Aspal Concrete / Laston ( AC - WC ) ton 1,483,500.00
6 Aspal Threated Base ( ATB ) kg 1,320,500.00
7 Lataston / Hot Rols Sheet ( HRS ) kg 1,833,600.00
kg
R BAHAN PENGISAP AIR SUMUR DALAM ton
1 Pompa Kodok ton 189,900.00
2 Pompa Dragon Tegal ton 268,200.00
3 Pompa Dragon Asli 790,500.00
4 Mesin Pompa Air 100 W - Sanyo 1,210,500.00
5 Mesin Pompa Air 150 W - Sanyo unit 2,080,000.00
6 Pompa Zet Pump 250 W - Sanyo unit 5,458,000.00
7 Pompa Zet Pump 450 W - Sanyo unit 8,666,000.00
8 Pompa Submersible kap. 150 liter / menit 3 KW unit 29,866,000.00
9 Gear Pump Kap. 60 liter / menit unit 17,273,000.00
10 Deep Well dengan kelengkapannya kap. 150 liter / menit unit 189,258,000.00
11 Hand Oil Pump unit 5,715,000.00
unit
S BAHAN PENAMPUNG AIR unit
1 Tangki Air Fiber Glass 0.5 m3 ( Excel ) unit 1,290,000.00
2 Tangki Air Fiber Glass 1 m3 ( Excel ) unit 1,448,500.00
3 Tangki Air Fiber Glass 2 m3 ( Excel ) 2,150,000.00
4 Bak KM Fiber 60 x 60 281,000.00
5 Bak Taraso WC 40 x 40 bh 130,500.00
6 Bak KM Taraso 60 x 60 bh 177,500.00
bh
T ALAT TUKANG
1 Palu 0.5 kg bh 43,500.00
2 Cangkul bh 27,500.00
3 Singkup 46,000.00
4 Sekrop 55,500.00
5 Pengki bh 14,000.00
6 Linggis bh 46,000.00
7 Rool Meter 30 meter ( Bahan Plastik ) bh 111,100.00
8 Rool Meter 5 meter ( Bahan Besi ) bh 40,000.00
9 Selang Plastik untuk Water Pas dia. 0.5 cm bh 1,700.00
10 Amplas bh 11,900.00
11 Seal Tape bh
12 Water Pas Alumunium 60 cm bh 92,500.00
m
U BAHAN BAKAR DAN PELUMAS lbr
1 Minyak Tanah bh 19,000.00
2 Kayu Bakar dari Kayu Karet bh 164,500.00
3 Bahan Bakar Residu 30,500.00
4 Minyak Solar 7,500.00
5 Bensin Premium lt 8,000.00
6 Plus Oil m3 3,500.00
7 Oil Mesran 40 SAE lt 57,500.00
8 Elpiji / botol lt 112,500.00
9 Asitilin / Botol lt 98,000.00
10 Angin ( O2 ) / botol lt 73,500.00
11 Karbit lt 21,500.00
12 Minyak Bekisting 15 kg 45,000.00
13 Rapidrant 15.1 kg btl 17,500.00
14 Soda Api btl 39,500.00
15 Sabun kg 2,500.00
16 Arang Kayu ltr 11,500.00
17 Kawat Las Gln 1,500.00
kg
V BAHAN PAGAR kg
1 Panel Beton Pracetak kg 200,900.00
2 Kolom Beton Pracetak bh 290,500.00

B BIDANG PERTAMANAN lbr


1 Aglomena btg 55,000.00
2 Bambu krisik/jepang 55,000.00
3 Furadan 26,500.00
4 Kompos/pupuk kandang 27,500.00
5 Matoa (2 m) batang 42,500.00
6 Palm (botol, ekor tupai, putri, dll) tinggi 2 m batang 110,500.00
7 Philo kg 83,000.00
8 Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2 m batang 27,500.00
9 Pohon perdu (kaca piring, puring, mawar, melati, dll) batang 10,500.00
10 Rumput gajah mini batang 16,500.00
batang
batang
Keterangan : batang
Harga material diatas sudah termasuk profit / keuntungan m2

KONSULTAN PERENCANA
CV. PRISMA CONSULT

( H. ENDJUN SUDJA'I )
Direktur
1.0000

181,232.00 181,232.00
92,308.00 92,308.00
211,030.00 211,030.00
180,480.00 180,480.00
241,392.00 241,392.00
264,140.00 264,140.00
267,806.00 267,806.00
30,644.00 30,644.00
231,240.00 231,240.00
218,268.00 218,268.00
211,970.00 211,970.00
202,664.00 202,664.00
212,534.00 212,534.00
187,060.00 187,060.00
178,600.00 178,600.00
100,110.00 100,110.00
14,664.00 14,664.00
76,234.00 76,234.00
101,520.00 101,520.00
2,500.00 2,500.00
2,700.00 2,700.00
6,000.00 6,000.00
850.00 850.00
750.00 750.00
2,000.00 2,000.00
16,000.00 16,000.00
17,200.00 17,200.00
10,700.00 10,700.00
14,900.00 14,900.00
89,300.00 89,300.00
119,500.00 119,500.00
83,600.00 83,600.00
94,600.00 94,600.00
38,400.00 38,400.00
77,400.00 77,400.00
1,548.00 1,548.00
1,958.00 1,958.00
102,000.00 102,000.00
64,800.00 64,800.00
1,386,000.00 1,386,000.00
1,248,000.00 1,248,000.00
1,220,000.00 1,220,000.00
1,219,000.00 1,219,000.00
1,165,000.00 1,165,000.00
1,062,000.00 1,062,000.00
388,700.00 388,700.00
20,200.00 20,200.00
15,000.00 15,000.00
34,500.00 34,500.00
350.00 350.00
2,800.00 2,800.00
5,700.00 5,700.00
6,500.00 6,500.00
3,500.00 3,500.00

30,693.00 30,693.00
27,500.00 27,500.00
135,000.00 135,000.00
82,500.00 82,500.00
27,500.00 27,500.00
92,500.00 92,500.00
22,500.00 22,500.00
35,000.00 35,000.00
45,000.00 45,000.00
100,000.00 100,000.00
205,000.00 205,000.00
80,000.00 80,000.00
68,000.00 68,000.00
35,000.00 35,000.00
9,500.00 9,500.00
10,500.00 10,500.00
26,000.00 26,000.00
32,000.00 32,000.00
395,000.00 395,000.00
390,000.00 390,000.00
16,500.00 16,500.00
23,500.00 23,500.00
5,500.00 5,500.00
6,000.00 6,000.00
17,500.00 17,500.00
115,000.00 115,000.00
35,000.00 35,000.00
40,000.00 40,000.00
42,000.00 42,000.00
40,000.00 40,000.00
55,000.00 55,000.00
125,000.00 125,000.00
21,000.00 21,000.00
26,300.00 26,300.00
23,700.00 23,700.00
34,000.00 34,000.00
57,800.00 57,800.00
43,200.00 43,200.00
40,000.00 40,000.00
5,500.00 5,500.00
26,900.00 26,900.00
33,500.00 33,500.00
45,000.00 45,000.00
45,900.00 45,900.00
52,500.00 52,500.00
48,400.00 48,400.00
84,000.00 84,000.00
74,500.00 74,500.00
3,700.00 3,700.00
30,600.00 30,600.00
42,300.00 42,300.00
1,000.00 1,000.00
55,500.00 55,500.00
9,000.00 9,000.00

19,500.00 19,500.00
27,500.00 27,500.00
42,500.00 42,500.00
7,805,000.00 7,805,000.00
5,810,000.00 5,810,000.00
6,155,500.00 6,155,500.00
6,262,000.00 6,262,000.00
6,405,800.00 6,405,800.00
7,000,000.00 7,000,000.00
7,310,000.00 7,310,000.00
9,500,000.00 9,500,000.00
9,596,800.00 9,596,800.00
2,923,800.00 2,923,800.00
22,850,000.00 22,850,000.00
24,410,000.00 24,410,000.00
15,000,000.00 15,000,000.00
14,010,000.00 14,010,000.00
2,276,800.00 2,276,800.00
2,058,000.00 2,058,000.00
2,279,000.00 2,279,000.00
24,900.00 24,900.00
30,800.00 30,800.00
9,800.00 9,800.00
10,500.00 10,500.00
15,000.00 15,000.00
19,000.00 19,000.00
32,400.00 32,400.00
176,500.00 176,500.00
135,000.00 135,000.00
3,049,500.00 3,049,500.00
3,692,500.00 3,692,500.00
2,700.00 2,700.00
3,500.00 3,500.00
4,300.00 4,300.00
2,950,000.00 2,950,000.00
2,705,000.00 2,705,000.00
1,209,000.00 1,209,000.00
294,300.00 294,300.00
25,800.00 25,800.00
24,500.00 24,500.00
592,000.00 592,000.00
5,250.00 5,250.00
386,500.00 386,500.00
3,000.00 3,000.00

18,500.00 18,500.00
68,700.00 68,700.00
25,000.00 25,000.00
21,500.00 21,500.00
87,800.00 87,800.00
92,200.00 92,200.00
47,700.00 47,700.00
13,800.00 13,800.00
70,000.00 70,000.00
146,500.00 146,500.00
16,500.00 16,500.00
74,500.00 74,500.00
83,000.00 83,000.00
9,000.00 9,000.00
65,800.00 65,800.00
65,000.00 65,000.00
68,500.00 68,500.00
60,500.00 60,500.00
98,500.00 98,500.00
183,500.00 183,500.00
132,500.00 132,500.00
22,500.00 22,500.00
25,000.00 25,000.00
37,700.00 37,700.00
61,500.00 61,500.00
166,500.00 166,500.00
215,000.00 215,000.00
282,500.00 282,500.00
357,500.00 357,500.00
260,000.00 260,000.00
145,000.00 145,000.00
142,500.00 142,500.00
145,000.00 145,000.00
140,000.00 140,000.00
127,500.00 127,500.00
142,500.00 142,500.00
61,500.00 61,500.00
98,500.00 98,500.00
147,000.00 147,000.00
175,000.00 175,000.00
147,500.00 147,500.00
262,500.00 262,500.00
175,000.00 175,000.00

3,800.00 3,800.00
2,700.00 2,700.00
3,800.00 3,800.00
3,000.00 3,000.00
4,000.00 4,000.00
3,600.00 3,600.00
6,000.00 6,000.00
6,500.00 6,500.00
3,500.00 3,500.00
2,700.00 2,700.00
4,300.00 4,300.00
1,600.00 1,600.00
70,000.00 70,000.00
75,000.00 75,000.00
60,000.00 60,000.00
62,500.00 62,500.00
65,000.00 65,000.00
60,000.00 60,000.00
65,000.00 65,000.00
55,500.00 55,500.00
60,500.00 60,500.00
67,500.00 67,500.00
66,000.00 66,000.00
65,500.00 65,500.00
80,000.00 80,000.00
83,000.00 83,000.00
81,500.00 81,500.00
81,500.00 81,500.00
83,000.00 83,000.00
76,000.00 76,000.00
76,000.00 76,000.00
80,000.00 80,000.00
80,000.00 80,000.00
85,000.00 85,000.00
65,500.00 65,500.00
1,128,500.00 1,128,500.00
389,000.00 389,000.00
413,500.00 413,500.00
15,500.00 15,500.00
25,000.00 25,000.00
35,000.00 35,000.00
15,000.00 15,000.00
2,033,500.00 2,033,500.00
1,774,500.00 1,774,500.00
1,464,500.00 1,464,500.00
1,429,500.00 1,429,500.00
380,000.00 380,000.00
355,500.00 355,500.00
225,500.00 225,500.00
605,000.00 605,000.00
605,500.00 605,500.00
380,500.00 380,500.00
375,000.00 375,000.00
262,500.00 262,500.00
175,000.00 175,000.00
395,000.00 395,000.00
255,000.00 255,000.00
106,500.00 106,500.00
650.00 650.00
41,500.00 41,500.00
3,500.00 3,500.00
4,000.00 4,000.00
4,000.00 4,000.00
4,500.00 4,500.00
5,000.00 5,000.00
5,500.00 5,500.00
2,000.00 2,000.00
2,200.00 2,200.00
2,500.00 2,500.00
3,000.00 3,000.00
0.00 0.00

48,000.00 48,000.00
60,000.00 60,000.00
79,000.00 79,000.00
53,000.00 53,000.00
68,000.00 68,000.00
85,000.00 85,000.00
98,000.00 98,000.00
135,000.00 135,000.00
310,000.00 310,000.00
305,000.00 305,000.00
10,000.00 10,000.00
13,000.00 13,000.00
17,000.00 17,000.00
23,500.00 23,500.00
18,000.00 18,000.00

16,500.00 16,500.00
22,800.00 22,800.00
188,500.00 188,500.00
203,500.00 203,500.00
26,400.00 26,400.00
26,300.00 26,300.00
20,200.00 20,200.00
23,800.00 23,800.00
21,200.00 21,200.00
11,700.00 11,700.00
30,500.00 30,500.00
70,000.00 70,000.00
1,100.00 1,100.00
31,100.00 31,100.00
45,600.00 45,600.00
35,500.00 35,500.00
14,800.00 14,800.00
16,000.00 16,000.00
15,500.00 15,500.00
35,500.00 35,500.00
35,500.00 35,500.00
80,000.00 80,000.00
37,000.00 37,000.00
20,300.00 20,300.00
31,500.00 31,500.00
26,000.00 26,000.00
57,500.00 57,500.00
42,600.00 42,600.00
51,000.00 51,000.00
47,700.00 47,700.00
35,700.00 35,700.00
36,300.00 36,300.00
36,500.00 36,500.00
20,100.00 20,100.00
29,500.00 29,500.00
55,500.00 55,500.00
98,800.00 98,800.00
122,000.00 122,000.00
155,600.00 155,600.00
157,500.00 157,500.00
189,000.00 189,000.00
62,000.00 62,000.00
166,500.00 166,500.00
179,500.00 179,500.00
89,100.00 89,100.00
612,100.00 612,100.00
125,000.00 125,000.00
112,200.00 112,200.00
108,700.00 108,700.00
98,800.00 98,800.00
233,000.00 233,000.00
211,800.00 211,800.00
379,800.00 379,800.00
115,000.00 115,000.00
8,300.00 8,300.00
38,500.00 38,500.00
418,300.00 418,300.00
58,123.00 58,123.00
1,740,000.00 1,740,000.00
228,500.00 228,500.00
18,500.00 18,500.00
19,500.00 19,500.00
15,600.00 15,600.00
15,600.00 15,600.00
98,800.00 98,800.00
16,200.00 16,200.00
29,400.00 29,400.00
31,800.00 31,800.00
39,300.00 39,300.00

26,300.00 26,300.00
48,500.00 48,500.00
12,100.00 12,100.00
13,500.00 13,500.00
25,000.00 25,000.00
32,200.00 32,200.00
505,300.00 505,300.00
429,300.00 429,300.00
551,900.00 551,900.00
220,600.00 220,600.00
414,800.00 414,800.00
2,356,300.00 2,356,300.00
551,900.00 551,900.00
337,300.00 337,300.00
187,000.00 187,000.00
220,000.00 220,000.00
253,000.00 253,000.00
319,000.00 319,000.00
132,000.00 132,000.00
154,000.00 154,000.00
187,000.00 187,000.00
231,000.00 231,000.00
253,000.00 253,000.00
330,000.00 330,000.00

75,900.00 75,900.00
96,200.00 96,200.00
122,100.00 122,100.00
201,500.00 201,500.00
163,600.00 163,600.00
355,800.00 355,800.00
689,700.00 689,700.00
432,000.00 432,000.00
165,600.00 165,600.00
205,100.00 205,100.00
257,800.00 257,800.00
1,783,300.00 1,783,300.00
3,768,300.00 3,768,300.00
1,390,300.00 1,390,300.00
24,200.00 24,200.00
138,300.00 138,300.00
65,000.00 65,000.00
2,500.00 2,500.00
233,000.00 233,000.00
120,200.00 120,200.00

24,000.00 24,000.00
24,000.00 24,000.00
18,400.00 18,400.00
1,700.00 1,700.00
1,000.00 1,000.00
63,000.00 63,000.00
24,000.00 24,000.00
8,300.00 8,300.00
79,000.00 79,000.00
17,500.00 17,500.00
10,300.00 10,300.00
5,500.00 5,500.00
850.00 850.00
8,000.00 8,000.00
700.00 700.00
300.00 300.00
38,500.00 38,500.00
18,500.00 18,500.00
300.00 300.00
14,000.00 14,000.00

32,700.00 32,700.00
65,700.00 65,700.00
134,600.00 134,600.00
183,500.00 183,500.00
231,300.00 231,300.00
327,800.00 327,800.00
387,000.00 387,000.00
483,500.00 483,500.00
654,500.00 654,500.00
956,600.00 956,600.00
1,565,800.00 1,565,800.00
189,600.00 189,600.00
250,700.00 250,700.00
402,500.00 402,500.00
630,500.00 630,500.00
850,000.00 850,000.00
120,500.00 120,500.00
175,500.00 175,500.00
199,700.00 199,700.00
285,500.00 285,500.00
308,600.00 308,600.00
359,100.00 359,100.00
514,200.00 514,200.00
739,500.00 739,500.00
934,900.00 934,900.00
950,000.00 950,000.00
7,000.00 7,000.00
9,500.00 9,500.00
18,500.00 18,500.00
21,800.00 21,800.00
23,000.00 23,000.00
25,000.00 25,000.00
56,500.00 56,500.00
66,500.00 66,500.00
83,500.00 83,500.00
130,500.00 130,500.00
42,500.00 42,500.00
55,500.00 55,500.00
65,000.00 65,000.00
82,500.00 82,500.00
110,000.00 110,000.00
120,000.00 120,000.00
170,000.00 170,000.00
215,000.00 215,000.00
360,000.00 360,000.00
675,000.00 675,000.00
850,000.00 850,000.00
25,000.00 25,000.00
28,500.00 28,500.00
42,500.00 42,500.00
60,500.00 60,500.00
61,500.00 61,500.00
80,000.00 80,000.00
130,500.00 130,500.00
155,000.00 155,000.00
265,000.00 265,000.00
4,700.00 4,700.00
5,000.00 5,000.00
5,500.00 5,500.00
8,000.00 8,000.00
10,500.00 10,500.00
15,000.00 15,000.00
17,500.00 17,500.00
29,500.00 29,500.00
33,000.00 33,000.00
38,000.00 38,000.00
99,000.00 99,000.00
10,500.00 10,500.00
4,500.00 4,500.00
40,500.00 40,500.00
55,000.00 55,000.00
60,000.00 60,000.00
70,000.00 70,000.00
76,000.00 76,000.00
87,500.00 87,500.00
95,000.00 95,000.00

115,000.00 115,000.00
137,500.00 137,500.00
230,000.00 230,000.00
295,000.00 295,000.00
785,000.00 785,000.00
915,000.00 915,000.00
95,500.00 95,500.00
36,000.00 36,000.00
44,500.00 44,500.00
61,500.00 61,500.00
73,500.00 73,500.00
295,000.00 295,000.00
51,500.00 51,500.00
245,000.00 245,000.00
150,000.00 150,000.00
55,000.00 55,000.00
45,000.00 45,000.00
160,000.00 160,000.00
57,500.00 57,500.00
252,000.00 252,000.00
2,310,000.00 2,310,000.00
51,500.00 51,500.00
1,115,000.00 1,115,000.00
800,000.00 800,000.00
227,500.00 227,500.00
207,500.00 207,500.00
2,236,500.00 2,236,500.00
1,897,500.00 1,897,500.00
1,002,000.00 1,002,000.00
1,399,500.00 1,399,500.00
1,952,500.00 1,952,500.00
545,500.00 545,500.00
438,500.00 438,500.00
1,400,000.00 1,400,000.00
1,815,500.00 1,815,500.00
66,000.00 66,000.00

36,500.00 36,500.00
52,000.00 52,000.00
110,000.00 110,000.00
155,000.00 155,000.00
182,500.00 182,500.00
85,000.00 85,000.00
122,500.00 122,500.00
69,500.00 69,500.00
91,500.00 91,500.00
81,000.00 81,000.00
72,500.00 72,500.00
65,500.00 65,500.00
47,000.00 47,000.00
86,500.00 86,500.00
107,500.00 107,500.00
88,000.00 88,000.00
536,000.00 536,000.00
312,000.00 312,000.00
20,000.00 20,000.00
2,000.00 2,000.00
3,000.00 3,000.00
2,500.00 2,500.00
8,500.00 8,500.00
5,000.00 5,000.00
11,000.00 11,000.00
225,000.00 225,000.00
190,000.00 190,000.00
152,500.00 152,500.00
89,000.00 89,000.00
115,900.00 115,900.00
110,900.00 110,900.00
92,300.00 92,300.00
97,600.00 97,600.00
106,500.00 106,500.00
9,000.00 9,000.00
27,500.00 27,500.00
115,000.00 115,000.00
145,500.00 145,500.00
147,000.00 147,000.00
150,000.00 150,000.00
3,000.00 3,000.00
4,500.00 4,500.00
8,500.00 8,500.00
12,000.00 12,000.00
11,000.00 11,000.00
3,500.00 3,500.00
5,000.00 5,000.00
6,500.00 6,500.00
8,000.00 8,000.00
39,000.00 39,000.00
41,500.00 41,500.00
78,500.00 78,500.00
22,500.00 22,500.00
17,500.00 17,500.00
38,500.00 38,500.00
23,000.00 23,000.00
11,500.00 11,500.00
8,000.00 8,000.00
2,500.00 2,500.00
2,000.00 2,000.00
8,000.00 8,000.00
4,000.00 4,000.00
100,000.00 100,000.00

78,536,500.00 78,536,500.00
237,995,000.00 237,995,000.00
650,812,000.00 650,812,000.00
40,698,000.00 40,698,000.00
7,540,000.00 7,540,000.00
5,353,000.00 5,353,000.00
7,550,000.00 7,550,000.00
6,040,500.00 6,040,500.00
1,212,500.00 1,212,500.00
33,871,500.00 33,871,500.00
24,119,500.00 24,119,500.00
5,692,000.00 5,692,000.00
5,000,000.00 5,000,000.00

105,000.00 105,000.00
155,000.00 155,000.00
7,000.00 7,000.00
8,000.00 8,000.00
5,000.00 5,000.00
11,500.00 11,500.00
8,000.00 8,000.00
6,500.00 6,500.00
16,000.00 16,000.00
21,500.00 21,500.00
12,500.00 12,500.00
14,500.00 14,500.00
20,500.00 20,500.00
19,500.00 19,500.00
132,500.00 132,500.00
27,500.00 27,500.00
31,500.00 31,500.00
13,000.00 13,000.00
21,500.00 21,500.00
26,500.00 26,500.00
15,000.00 15,000.00
21,500.00 21,500.00
20,500.00 20,500.00
22,500.00 22,500.00
28,500.00 28,500.00
39,500.00 39,500.00
46,500.00 46,500.00
926,500.00 926,500.00
2,201,000.00 2,201,000.00
169,500.00 169,500.00
225,500.00 225,500.00
245,000.00 245,000.00
516,000.00 516,000.00
61,500.00 61,500.00
117,500.00 117,500.00
573,500.00 573,500.00
26,500.00 26,500.00
29,000.00 29,000.00
26,500.00 26,500.00
96,500.00 96,500.00
160,000.00 160,000.00
97,500.00 97,500.00
198,000.00 198,000.00
67,500.00 67,500.00
33,000.00 33,000.00
39,000.00 39,000.00
46,000.00 46,000.00
42,500.00 42,500.00
45,000.00 45,000.00
45,500.00 45,500.00
9,500.00 9,500.00
7,500.00 7,500.00
158,500.00 158,500.00
125,000.00 125,000.00
50,000.00 50,000.00
75,000.00 75,000.00
163,000.00 163,000.00
338,500.00 338,500.00
245,000.00 245,000.00
812,000.00 812,000.00
112,000.00 112,000.00
72,500.00 72,500.00
466,500.00 466,500.00
326,000.00 326,000.00

63,500.00 63,500.00
452,500.00 452,500.00
450,000.00 450,000.00
139,500.00 139,500.00
951,000.00 951,000.00
150,000.00 150,000.00
212,500.00 212,500.00
369,500.00 369,500.00
182,500.00 182,500.00
228,500.00 228,500.00
59,900.00 59,900.00
113,100.00 113,100.00
645,300.00 645,300.00
93,800.00 93,800.00
104,000.00 104,000.00
51,500.00 51,500.00
56,800.00 56,800.00
54,800.00 54,800.00
6,000.00 6,000.00
8,000.00 8,000.00
31,900.00 31,900.00
35,500.00 35,500.00
35,000.00 35,000.00
36,300.00 36,300.00
23,100.00 23,100.00
16,500.00 16,500.00
15,100.00 15,100.00
10,100.00 10,100.00
350,000.00 350,000.00
462,000.00 462,000.00
657,300.00 657,300.00
220,000.00 220,000.00
226,000.00 226,000.00
281,500.00 281,500.00
21,500.00 21,500.00
48,000.00 48,000.00
59,000.00 59,000.00
96,500.00 96,500.00
55,500.00 55,500.00
64,500.00 64,500.00
57,000.00 57,000.00

1,483,500.00 1,483,500.00
13,800.00 13,800.00
12,000.00 12,000.00
12,000.00 12,000.00
1,483,500.00 1,483,500.00
1,320,500.00 1,320,500.00
1,833,600.00 1,833,600.00

189,900.00 189,900.00
268,200.00 268,200.00
790,500.00 790,500.00
1,210,500.00 1,210,500.00
2,080,000.00 2,080,000.00
5,458,000.00 5,458,000.00
8,666,000.00 8,666,000.00
29,866,000.00 29,866,000.00
17,273,000.00 17,273,000.00
189,258,000.00 189,258,000.00
5,715,000.00 5,715,000.00

1,290,000.00 1,290,000.00
1,448,500.00 1,448,500.00
2,150,000.00 2,150,000.00
281,000.00 281,000.00
130,500.00 130,500.00
177,500.00 177,500.00

43,500.00 43,500.00
27,500.00 27,500.00
46,000.00 46,000.00
55,500.00 55,500.00
14,000.00 14,000.00
46,000.00 46,000.00
111,100.00 111,100.00
40,000.00 40,000.00
1,700.00 1,700.00
11,900.00 11,900.00

92,500.00 92,500.00

19,000.00 19,000.00
164,500.00 164,500.00
30,500.00 30,500.00
7,500.00 7,500.00
8,000.00 8,000.00
3,500.00 3,500.00
57,500.00 57,500.00
112,500.00 112,500.00
98,000.00 98,000.00
73,500.00 73,500.00
21,500.00 21,500.00
45,000.00 45,000.00
17,500.00 17,500.00
39,500.00 39,500.00
2,500.00 2,500.00
11,500.00 11,500.00
1,500.00 1,500.00

200,900.00 200,900.00
290,500.00 290,500.00

55,000.00 55,000.00
55,000.00 55,000.00
26,500.00 26,500.00
27,500.00 27,500.00
42,500.00 42,500.00
110,500.00 110,500.00
83,000.00 83,000.00
27,500.00 27,500.00
10,500.00 10,500.00
16,500.00 16,500.00
PEKERJAAN PERSIAPAN

KODE
URAIAN PEKERJAAN
ANALISA

1 2
A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

A.1 1m Pekerjaan Pagar Setinggi 2m


1 lbr Seng BPLJS 0,25 mm x 2m
0.02 m3 Kayu Kaso
0.5 kg Paku Payung 5cm
0.0900 m³ Batu pecah mesin 5/7
0.0625 Oh Pembantu Tukang
0.0625 Oh Tukang
0.0250 Oh Kepala tukang
0.0125 Oh Mandor

A.2 1 m² Membersihkan lapangan dan peralatan


0.1000 Oh Tukang Taman
0.0050 Oh Mandor

A.3 1 m² Pembuatan bak adukan ukuran 40 cm x 50 cm x 20 cm


0.0360 m³ Kayu Papan Terentang
0.0800 kg Paku 8 - 15 cm
0.0140 m³ Kayu Kaso 5/7
0.3000 Oh Tukang kayu
0.0015 Oh Mandor

A.4 1 m' Pengukuran dan pemasangan bouwplank, papan 2/20


0.0070 m³ Kayu Papan Terentang
0.0120 m³ Kayu Kaso 5/7 kasau 5/7
0.0200 kg Paku 8 - 15 cm
0.1000 Oh Pekerja tak terlatih
0.1000 Oh Tukang kayu
0.0100 Oh Kepala tukang
0.0050 Oh Mandor

A.5 1 m² Pembuatan bedeng buruh


1.2500 btg Dolken 7 s/d 10
0.1860 m³ Kayu Papan Terentang
0.3000 kg Paku 8 - 15 cm
18.0000 kg Semen PC @ 50 kg
0.0300 m³ Pasir Beton
0.0500 m³ Batu pecah mesin 2/3
1.5000 lbr Atap seng gelombang 180x102x5mm

1.3500 lbr Triplek 4mm 120 x240cm


1.0000 Oh Pembantu Tukang
2.0000 Oh Tukang kayu
0.2000 Oh Kepala tukang
0.0500 Oh Mandor

A.6 1 m² Pembuatan stegger


1.2500 btg Kayu Dolken 7 s/d 10
0.3000 kg Paku 8 - 15 cm
0.2500 Oh Pembantu Tukang
0.0170 Oh Tukang kayu
0.0020 Oh Kepala tukang
0.0130 Oh Mandor
HARGA SATUAN (Rp.)
JUMLAH (Rp.)
BAHAN UPAH
3 4 5

58,120.00 58,120.00
3,692,500.00 77,542.50
14,000.00 7,000.00
202,660.00 18,239.40
67,000.00 4,187.50
70,000.00 4,375.00
80,000.00 2,000.00
85,000.00 1,062.50
172,526.90

70,000.00 7,000.00
85,000.00 425.00
7,425.00

2,950,000.00 106,200.00
18,400.00 1,472.00
3,692,500.00 51,695.00
70,000.00 21,000.00
85,000.00 127.50
180,494.50

2,950,000.00 20,650.00
3,692,500.00 44,310.00
18,400.00 368.00
48,802.53 4,880.25
70,000.00 7,000.00
80,000.00 800.00
85,000.00 425.00
78,433.25

30,800.00 38,500.00
1,209,000.00 224,874.00
18,400.00 5,520.00
1,398.00 25,164.00
264,140.00 7,924.20
218,260.00 10,913.00
107,500.00 161,250.00

68,500.00 92,475.00
67,000.00 67,000.00
70,000.00 140,000.00
80,000.00 16,000.00
85,000.00 4,250.00
793,870.20

30,800.00 38,500.00
18,400.00 5,520.00
67,000.00 16,750.00
70,000.00 1,190.00
87,151.63 174.30
85,000.00 1,105.00
63,239.30
PEKERJAAN GALIAN TANAH

KODE
URAIAN PEKERJAAN
ANALISA

1 2
B. ANALISA BIAYA KONSTRUKSI PEKERJAAN GALIAN

B.1 1 m³ Galian Tanah Sedalam 1m


0.4000 Oh Tukang
0.0400 Oh Mandor

B.2 1 m³ Galian Tanah Sedalam 2m


0.5000 Oh Tukang
0.0500 Oh Mandor

B.2 1 m³ Pemadatan Tanah (dengan tenaga)


0.5000 Oh Tukang
0.0500 Oh Mandor

B.3 1 m³ Urugan Pasir (dengan tenaga)


1.2000 m³ Pasir urug / timbun
0.3000 Oh Pekerja tak terlatih
0.0100 Oh Mandor

B.4 1 m³ Urugan Sirtu (dengan tenaga)


1.2000 m³ Sirtu
0.2500 Oh Pekerja tak terlatih
0.0250 Oh Mandor
H

HARGA SATUAN (Rp.)


JUMLAH (Rp.)
BAHAN UPAH
3 4 5

70,000.00 28,000.00
85,000.00 3,400.00
31,400.00

70,000.00 35,000.00
85,000.00 4,250.00
39,250.00

70,000.00 35,000.00
85,000.00 4,250.00
39,250.00

181,230.00 217,476.00
48,802.53 14,640.76
95,496.24 954.96
233,071.72

211,030.00 253,236.00
48,802.53 12,200.63
95,496.24 2,387.41
267,824.04
PEKERJAAN PONDASI

KODE
URAIAN PEKERJAAN
ANALISA

1 2
C. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

C.1 1 m³ Pasang Pondasi Batu Belah 1 PC : 4 Ps


1.1000 m³ Batu belah pondasi
163.0000 kg Semen PC @ 50 kg
0.5200 m³ Pasir pasang kali
1.5000 Oh Pembantu Tukang
0.6000 Oh Tukang batu
0.0600 Oh Kepala tukang
0.0750 Oh Mandor

C.2 1 m³ Pasang Pondasi Batu Kali. 1 PC : 5 Ps


1.1000 m³ Batu belah pondasi
136.0000 kg Semen PC @ 50 kg
0.5440 m³ Pasir pasang kali
1.5000 Oh Pembantu Tukang
0.6000 Oh Tukang batu
0.0600 Oh Kepala tukang
0.0750 Oh Mandor

C.4 Beton 1:2:3/m3 dengan Koral


1.1000 m³ Semen PC @ 50 kg

0.6500 m3 Pasir Beton


0.5440 m³ Batu Koral Beton Kali
1.5000 Oh Pembantu Tukang `
0.6000 Oh Tukang batu
0.0600 Oh Kepala tukang
0.0750 Oh Mandor

C.5 Beton Ready Mix K-225


1.0300 m³ Ready Mix Beton K-225
1.5000 Oh Pembantu Tukang `
0.6000 Oh Tukang batu
0.0600 Oh Kepala tukang
0.0750 Oh Mandor
HARGA SATUAN (Rp.)
JUMLAH (Rp.)
BAHAN UPAH
3 4 5

212,530.00 233,783.00
1,540.00 251,020.00
264,140.00 137,352.80
67,000.00 100,500.00
70,000.00 42,000.00
80,000.00 4,800.00
85,000.00 6,375.00
775,830.80

212,530.00 233,783.00
1,540.00 209,440.00
241,390.00 131,316.16
67,000.00 100,500.00
79,228.75 47,537.25
80,000.00 4,800.00
85,000.00 6,375.00
733,751.41

1,540.00 1,694.00
264,140.00 171,691.00
178,600.00 97,158.40
67,000.00 100,500.00
70,000.00 42,000.00
80,000.00 4,800.00
85,000.00 6,375.00
424,218.40

1,165,000.00 1,199,950.00
67,000.00 100,500.00
70,000.00 42,000.00
80,000.00 4,800.00
85,000.00 6,375.00
1,353,625.00
PEKERJAAN DINDING

KODE
URAIAN PEKERJAAN
ANALISA

1 2
D. ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING

D.1 1 m² Pasang Dinding Bataco Uk. 20 cm x 40 cm, 1 PC : 4 Ps


13.0000 bh Bataco
5.8333 kg Semen PC @ 50 kg
0.0133 m³ Pasir pasang kali
0.0833 Oh Pembantu Tukang
0.0833 Oh Tukang batu
0.0083 Oh Kepala tukang
0.0080 Oh Mandor

D.2 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 2 Ps


140.0000 bh Batu bata merah (lokal)
43.5000 kg Semen PC @ 50 kg
0.0800 m³ Pasir pasang kali
0.6500 Oh Pembantu Tukang
0.2000 Oh Tukang batu
0.0200 Oh Kepala tukang
0.0300 Oh Mandor

D.3 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 2 Ps


70.0000 bh Batu bata merah (lokal)
18.9500 kg Semen PC @ 50 kg
0.0380 m³ Pasir pasang kali
0.3200 Oh Pembantu Tukang
0.1000 Oh Tukang batu
0.0100 Oh Kepala tukang
0.0150 Oh Mandor

D.4 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 4 Ps


70.0000 bh Batu bata merah (lokal)
11.5000 kg Semen PC @ 50 kg
0.0430 m³ Pasir pasang Kali
0.3200 Oh Pembantu Tukang
0.1000 Oh Tukang batu
0.0100 Oh Kepala tukang
0.0150 Oh Mandor

D.5 1 m² Pasang dinding conblock (C.B. 10)


12.5000 bh Conblock 8 x 20 x40
7.2000 kg Semen PC @ 50 kg
0.0020 m³ Pasir ayak untuk beton
0.0210 m³ Pasir pasang kali
2.5400 kg Besi beton U - 39/ U-32 rata -rata
0.0030 kg Paku ukuran 8 - 15 cm
0.0010 m³ Kayu papan terentang
0.0150 kg Kawat beton
0.0030 m³ Batu pecah 2 - 3 (cm)
0.3400 Oh Pembantu Tukang
0.1070 Oh Tukang batu
0.0070 Oh Tukang besi / tukang las
0.0114 Oh Kepala tukang
0.0170 Oh Mandor

D.6 1 m² Pasang dinding roster uk. 20 cm x 20 cm


25.0000 bh Rooster block uk. 20 x 20 (cm)
12.8000 kg Semen PC @ 50 kg
0.0350 m³ Pasir pasang kali
0.3000 Oh Pembantu Tukang
0.1000 Oh Tukang batu
0.0100 Oh Kepala tukang
0.0150 Oh Mandor
HARGA SATUAN (Rp.)
JUMLAH (Rp.)
BAHAN UPAH
3 4 5

6,000.00 78,000.00
1,540.00 8,983.33
241,390.00 3,218.53
67,000.00 5,583.33
70,000.00 5,833.33
87,151.63 726.26
85,000.00 680.00
103,024.80

850.00 119,000.00
1,540.00 66,990.00
241,390.00 19,311.20
67,000.00 43,550.00
70,000.00 14,000.00
70,000.00 1,400.00
85,000.00 2,550.00
266,801.20

850.00 59,500.00
1,540.00 29,183.00
241,390.00 9,172.82
67,000.00 21,440.00
70,000.00 7,000.00
87,151.63 871.52
85,000.00 1,275.00
128,442.34

850.00 59,500.00
1,540.00 17,710.00
241,390.00 10,379.77
67,000.00 21,440.00
70,000.00 7,000.00
80,000.00 800.00
85,000.00 1,275.00
118,104.77
6,000.00 75,000.00
1,540.00 11,088.00
264,140.00 528.28
241,390.00 5,069.19
22,800.00 57,912.00
18,400.00 55.20
2,950,000.00 2,950.00
30,500.00 457.50
218,260.00 654.78
67,000.00 22,780.00
70,000.00 7,490.00
70,000.00 490.00
80,000.00 912.00
85,000.00 1,445.00
186,831.95

16,000.00 400,000.00
1,540.00 19,712.00
241,390.00 8,448.65
67,000.00 20,100.00
70,000.00 7,000.00
80,000.00 800.00
85,000.00 1,275.00
457,335.65
PEKERJAAN PLESTERAN

KODE
URAIAN PEKERJAAN
ANALISA

1 2
E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

E.1 1 m² Plesteran 1 PC : 4 Ps, tebal 15 mm


5.2000 kg Semen PC @ 50 kg
0.0200 m³ Pasir pasang kali
0.2000 Oh Pembantu Tukang
0.1500 Oh Tukang batu
0.0150 Oh Kepala tukang
0.0100 Oh Mandor

E.2 1 m² Plesteran 1 PC : 2 Ps, tebal 20 mm


14.2800 kg Semen PC @ 50 kg
0.0230 m³ Pasir pasang kali
0.2500 Oh Pembantu Tukang
0.2000 Oh Tukang batu
0.0200 Oh Kepala tukang
0.0125 Oh Mandor

E.3 1 m² Plesteran beton 1 PC : 3 Ps, tebal 15 mm


7.0700 kg Semen PC @ 50 kg
0.0210 m³ Pasir pasang kali
0.2600 Oh Pembantu Tukang
0.2000 Oh Tukang batu
0.0200 Oh Kepala tukang
0.0130 Oh Mandor

E.4 1 m² Plesteran waterproof batacote, 3 lapis


0.5000 kg Semen PC @ 50 kg
2.9000 m² Batacote
0.0060 m³ Pasir pasang
0.3000 Oh Pembantu Tukang
0.2000 Oh Tukang batu
0.0200 Oh Kepala tukang
0.0150 Oh Mandor

E.5 1 m² Plesteran siar, 1 PC : 2 Ps


4.3200 kg Semen PC @ 50 kg
0.0160 m³ Pasir pasang kali
0.1500 Oh Pembantu Tukang
0.0700 Oh Tukang batu
0.0070 Oh Kepala tukang
0.0080 Oh Mandor
HARGA SATUAN (Rp.)
JUMLAH (Rp.)
BAHAN UPAH
3 4 5

1,540.00 8,008.00
241,390.00 4,827.80
67,000.00 13,400.00
70,000.00 10,500.00
80,000.00 1,200.00
85,000.00 850.00
38,785.80

1,540.00 21,991.20
241,390.00 5,551.97
67,000.00 16,750.00
79,228.75 15,845.75
80,000.00 1,600.00
85,000.00 1,062.50
62,801.42

1,540.00 10,887.80
241,390.00 5,069.19
67,000.00 17,420.00
70,000.00 14,000.00
80,000.00 1,600.00
85,000.00 1,105.00
50,081.99

1,540.00 770.00
76,230.00 221,067.00
241,390.00 1,448.34
67,000.00 20,100.00
70,000.00 14,000.00
87,151.63 1,743.03
85,000.00 1,275.00
260,403.37

1,540.00 6,652.80
241,390.00 3,862.24
67,000.00 10,050.00
70,000.00 4,900.00
80,000.00 560.00
85,000.00 680.00
26,705.04
PEKERJAAN KAYU

KODE
URAIAN PEKERJAAN
ANALISA

1 2
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

F.1 1 m³ Pasang kusen pintu / jendela, kayu kelas II


1.1000 m³ Kayu Balok Terentang
6.0000 Oh Pembantu Tukang
20.0000 Oh Tukang kayu
2.0000 Oh Kepala tukang
0.3000 Oh Mandor

F.2 1 m³ Pasang balok profil, kayu kelas III (non SNI)


1.1000 m³ Kayu Balok Terentang
0.0300 kg Paku Ukuran 8 -15cm
0.0250 Oh Pembantu Tukang
0.6250 Oh Tukang kayu
0.0250 Oh Kepala tukang
0.0400 Oh Mandor

F.3 1 m³ Pasang konstruksi kuda-kuda, kayu kelas II


1.1000 m³ Kayu Balok Terentang
15.0000 kg Besi strip
0.8000 kg Paku Ukuran 8 -15cm
4.0000 Oh Pembantu Tukang
12.0000 Oh Tukang kayu
1.2000 Oh Kepala tukang
0.2000 Oh Mandor

F.4 1 m³ Pasang gording kuda-kuda, kayu kelas II (non SNI)


1.1000 m³ Kayu Balok Terentang
0.8000 kg Paku Ukuran 8 - 15cm
2.0000 Oh Pembantu Tukang
6.0000 Oh Tukang kayu
0.6000 Oh Kepala tukang
0.1000 Oh Mandor

F.5 1 m² Pasang kaso + reng untuk genteng, kayu kelas II


0.0165 m³ Kayu Balok Terentang
0.2000 kg Paku Ukuran 8 - 15 cm
0.1200 Oh Pembantu Tukang
0.1200 Oh Tukang kayu
0.0120 Oh Kepala tukang
0.0060 Oh Mandor

F.6 1 m² Pasang rangka langit-langit uk. 1 m x 1 m, kayu kelas II


0.0120 m³ Kayu Balok Terentang
0.1000 kg Paku Ukuran 8 -15cm
0.1500 Oh Pembantu Tukang
0.2500 Oh Tukang kayu
0.0250 Oh Kepala tukang
0.0750 Oh Mandor

F.7 1 m² Pasang rangka langit-langit uk. 30 cm x 60 cm, kayu kelas II


0.0230 m³ Kayu Balok Terentang
0.1500 kg Paku Ukuran 8 -15cm
0.2000 Oh Pembantu Tukang
0.3000 Oh Tukang kayu
0.0300 Oh Kepala tukang
0.0100 Oh Mandor

F.8 1 m² Pasang rangka langit-langit uk. 30 cm x 30 cm, kayu kelas II


0.0270 m³ Kayu Balok Terentang
0.2000 kg Paku Ukuran 8 - 15cm
0.2500 Oh Pembantu Tukang
0.3500 Oh Tukang kayu
0.0350 Oh Kepala tukang
0.0125 Oh Mandor

F.9 1 m² Pasang lisplank uk. 3 cm x 20 cm, kayu kelas II


0.0072 m³ Kayu Balok Terentang
0.0500 kg Paku Ukuran 8 -15cm
0.1000 Oh Pembantu Tukang
0.2000 Oh Tukang kayu
0.0200 Oh Kepala tukang
0.0050 Oh Mandor

F.10 1 m² Pasang lisplank uk. 3 cm x 30 cm, kayu kelas II


0.0110 m³ Kayu Papan Terentang
0.0500 kg Paku Ukuran 8 - 15cm
0.1100 Oh Pembantu Tukang
0.2200 Oh Tukang kayu
0.0220 Oh Kepala tukang
0.0050 Oh Mandor

F.11 1 m² Pasang dinding plywood,


0.4000 lbr Plywood 4mm 120x240
0.0500 kg Paku berbagai ukuran 2 - 5 cm
0.0250 Oh Pembantu Tukang
0.0750 Oh Tukang kayu
0.0075 Oh Kepala tukang
0.0013 Oh Mandor

F.12 1 m' Pasang list plafond, dengan kayu profil 3 cm x 3 cm, kayu kelas II
1.0500 m' List Profil Kamper 2cm
0.0500 kg Paku Ukuran 2 - 5cm
0.0210 Oh Pembantu Tukang
0.0210 Oh Tukang kayu
0.0020 Oh Kepala tukang
0.0010 Oh Mandor
HARGA SATUAN (Rp.)
JUMLAH (Rp.)
BAHAN UPAH
3 4 5

2,705,000.00 2,975,500.00
67,000.00 402,000.00
70,000.00 1,400,000.00
80,000.00 160,000.00
85,000.00 25,500.00
4,963,000.00

2,705,000.00 2,975,500.00
18,400.00 552.00
70,000.00 1,750.00
79,228.75 49,517.97
80,000.00 2,000.00
85,000.00 3,400.00
3,032,719.97

2,705,000.00 2,975,500.00
29,500.00 442,500.00
18,400.00 14,720.00
67,000.00 268,000.00
70,000.00 840,000.00
80,000.00 96,000.00
85,000.00 17,000.00
4,653,720.00

2,705,000.00 2,975,500.00
18,400.00 14,720.00
67,000.00 134,000.00
70,000.00 420,000.00
80,000.00 48,000.00
85,000.00 8,500.00
3,600,720.00

2,950,000.00 48,675.00
18,400.00 3,680.00
67,000.00 8,040.00
70,000.00 8,400.00
80,000.00 960.00
85,000.00 510.00
70,265.00

2,705,000.00 32,460.00
18,400.00 1,840.00
67,000.00 10,050.00
70,000.00 17,500.00
80,000.00 2,000.00
85,000.00 6,375.00
70,225.00

2,705,000.00 62,215.00
18,400.00 2,760.00
67,000.00 13,400.00
70,000.00 21,000.00
80,000.00 2,400.00
85,000.00 850.00
102,625.00

2,705,000.00 73,035.00
18,400.00 3,680.00
67,000.00 16,750.00
70,000.00 24,500.00
80,000.00 2,800.00
85,000.00 1,062.50
121,827.50

2,705,000.00 19,476.00
18,400.00 920.00
67,000.00 6,700.00
70,000.00 14,000.00
80,000.00 1,600.00
85,000.00 425.00
43,121.00

2,950,000.00 32,450.00
18,400.00 920.00
67,000.00 7,370.00
70,000.00 15,400.00
80,000.00 1,760.00
85,000.00 425.00
58,325.00
145,000.00 58,000.00
24,000.00 1,200.00
67,000.00 1,675.00
70,000.00 5,250.00
80,000.00 600.00
85,000.00 110.50
66,835.50

10,500.00 11,025.00
24,000.00 1,200.00
67,000.00 1,407.00
70,000.00 1,470.00
80,000.00 160.00
85,000.00 85.00
15,347.00
PEKERJAAN BETON

KODE
URAIAN PEKERJAAN
ANALISA

1 2
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

G.1 1 m³ Membuat beton tumbuk, 1 PC : 2 Ps : 3 krk


232.0000 kg Semen PC @ 50 kg
0.5200 m³ Pasir beton
0.7800 m³ Batu pecah 2 - 3 (cm)
1.6500 Oh Pembantu Tukang
0.2500 Oh Tukang batu
0.0250 Oh Kepala tukang
0.0800 Oh Mandor

G.2 1 m³ Membuat beton tumbuk, 1 PC : 3 Ps : 5 krk


218.0000 kg Semen PC @ 50 kg
0.5200 m³ Pasir Beton
0.8700 m³ Batu pecah 2 - 3 (cm)
1.6500 Oh Pembantu Tukang
0.2500 Oh Tukang batu
0.0250 Oh Kepala tukang
0.0800 Oh Mandor

G.3 1 m³ Membuat beton bertulang, 1 PC : 2 Ps : 4 krk


280.0000 kg Semen PC @ 50 kg
0.4500 m³ Pasir Beton
0.9000 m³ Batu pecah 2 - 3 (cm)
1.6500 Oh Pembantu Tukang
0.2500 Oh Tukang batu
0.0250 Oh Kepala tukang
0.0800 Oh Mandor

G.4 1 m³ Membuat beton bertulang, 1 PC : 1,5 Ps : 3 split


367.0000 kg Semen PC @ 50 kg
0.4400 m³ Pasir Beton
0.8800 m³ Batu pecah 2 - 3 (cm)
2.0000 Oh Pembantu Tukang
0.3500 Oh Tukang batu
0.0350 Oh Kepala tukang
1.0000 Oh Mandor

G.5 1 kg Pembesian dengan besi polos/ulir


1.0500 kg Besi beton
0.0150 kg Kawat beton
0.0070 Oh Pembantu Tukang
0.0070 Oh Tukang besi / tukang las
0.0007 Oh Kepala tukang
0.0003 Oh Mandor

G.6 Pembongkaran Bekisting 1 m³ beton


2.0000 Oh Pembantu Tukang

G.7 1 m² Pasang bekisting untuk pondasi


0.0400 m³ Kayu Papan Terentang
0.3000 kg Pak Ukuran 8 - 15 cm
0.1000 ltr Minyak bekisting
0.3000 Oh Pembantu Tukang
0.0260 Oh Tukang kayu
0.0260 Oh Kepala tukang
0.0050 Oh Mandor

G.8 1 m² Pasang bekisting untuk sloof


0.0450 m³ Kayu Papan Terentang
0.3000 kg Paku Ukuran 8 -15 cm
0.1000 ltr Minyak bekisting
0.3000 Oh Pembantu Tukang
0.0260 Oh Tukang kayu
0.0260 Oh Kepala tukang
0.0050 Oh Mandor

Untuk 1 m³ beton memerlukan bekisting = 5,77 x 167,195.00


G.9 1 m² Pasang bekisting untuk kolom
0.0400 m³ Kayu Papan Terentang
0.4000 kg Paku Ukuran 8 -15 cm
0.2000 ltr Minyak bekisting
0.0150 m³ Kayu Balok Terentang
0.3500 lbr Plywood 9mm 120x240cm
2.0000 btg Kayu dolken ø 7 - 10 (cm) panjang 4 m / kiau
0.3000 Oh Pembantu Tukang
0.3300 Oh Tukang kayu
0.0330 Oh Kepala tukang
0.0060 Oh Mandor

Untuk 1 m³ beton memerlukan bekisting = 11,54 x 347,110.00

G.10 1 m² Pasang bekisting untuk balok


0.0400 m³ Kayu Papan Terentang
0.4000 kg Paku Ukuran 8 -15 cm
0.2000 ltr Minyak bekisting
0.0180 m³ Kayu Balok Terentang
0.3500 lbr Plywood 9mm 120x240cm
2.0000 btg Kayu dolken ø 7 - 10 (cm) panjang 4 m / kiau
0.3200 Oh Pembantu Tukang
0.3300 Oh Tukang kayu
0.0330 Oh Kepala tukang
0.0060 Oh Mandor

Untuk 1 m³ beton memerlukan bekisting = 8,65 x 356,535.00

G.11 1 m² Pasang bekisting untuk lantai


0.0400 m³ Kayu Papan Terentang
0.4000 kg Paku Ukuran 8 -15cm
0.2000 ltr Minyak bekisting
0.0150 m³ Kayu Balok Terentang
0.3500 lbr Plywood 9mm 120x240cm
6.0000 btg Kayu dolken ø 7 - 10 (cm) panjang 4 m / kiau
0.3200 Oh Pembantu Tukang
0.3300 Oh Tukang kayu
0.0330 Oh Kepala tukang
0.0060 Oh Mandor

Untuk 1 m³ beton memerlukan Bekisting = 8,33 x 471,650.00


G.12 1 m³ Membuat beton mutu K. 225
338.0000 kg Semen PC @ 50 kg
0.6500 m³ Pasir Beton
0.6500 m³ Batu pecah 2 - 3 (cm)
6.0000 Oh Pembantu Tukang
1.0000 Oh Tukang batu
0.1000 Oh Kepala tukang
0.3000 Oh Mandor

G.13 1 m³ Membuat pondasi beton bertulang (150 kg besi + bekisting)


0.2000 m³ Kayu Papan Terentang
1.5000 kg Paku Ukuran 8 -15cm
0.4000 ltr Minyak bekisting
150.0000 kg Besi Beton U-39/rata2 u-32
2.2500 kg Kawat beton
323.0000 kg Semen PC @ 50 kg
0.5200 m³ Pasir Beton
0.7800 m³ Batu pecah 2 - 3 (cm)
3.9000 Oh Pembantu Tukang
0.3500 Oh Tukang batu
1.0400 Oh Tukang kayu
1.0500 Oh Tukang besi / tukang las
0.2450 Oh Kepala tukang
0.1650 Oh Mandor

G.14 1 m³ Membuat sloof beton bertulang (200 kg besi + bekisting)


0.2700 m³ Kayu Papan Terentang
2.0000 kg Paku Ukuran 8 -15 cm
0.6000 ltr Minyak bekisting
200.0000 kg Besi beton U-39/rata2 U-32
3.0000 kg Kawat beton
323.0000 kg Semen PC @ 50 kg
0.5200 m³ Pasir Beton
0.7800 m³ Batu pecah 2 - 3 (cm)
4.8500 Oh Pembantu Tukang
0.3500 Oh Tukang batu
1.5600 Oh Tukang kayu
1.4000 Oh Tukang besi / tukang las
0.3310 Oh Kepala tukang
0.1700 Oh Mandor

G.15 1 m³ Membuat kolom beton bertulang (150 kg besi + bekisting)


0.3200 m³ Kayu Papan Terentang
3.2000 kg Paku Ukuran 8 -15 cm
1.6000 ltr Minyak bekisting
150.0000 kg Besi beton
2.2500 kg Kawat beton
323.0000 kg Semen PC @ 50 kg
0.5200 m³ Pasir Beton
0.7800 m³ Batu pecah 2 - 3 (cm)
0.1200 m³ Kayu Balok Terentang
2.8000 lbr Plywood 9mm 120x240cm
32.0000 btg Kayu dolken ø 7 - 10 (cm) panjang 4 m / kiau
5.8000 Oh Pembantu Tukang
0.3500 Oh Tukang batu
2.8000 Oh Tukang kayu
1.0500 Oh Batu pecah 2 - 3 (cm)
0.4200 Oh Kepala tukang
0.1850 Oh Mandor

G.16 1 m' Membuat kolom penguat beton bertulang uk. 11 cm x 11 cm


0.0020 m³ Kayu Papan Terentang
0.0100 kg Paku Ukuran 8 -15cm
3.0000 kg Besi beton
0.4500 kg Kawat beton
4.0000 kg Semen PC @ 50 kg
0.0060 m³ Pasir Beton
0.0090 m³ Batu pecah 2 - 3 (cm)
0.0600 Oh Pembantu Tukang
0.0200 Oh Tukang batu
0.0200 Oh Tukang kayu
0.0200 Oh Tukang besi / tukang las
0.0060 Oh Kepala tukang
0.0030 Oh Mandor

G.33 1 m' Membuat ringbalk beton bertulang uk. 10 cm x 15 cm


0.0030 m³ Kayu Papan Terentang
0.0200 kg Paku ukuran 8 -15 cm
3.6000 kg Besi beton
0.0500 kg Kawat beton
5.5000 kg Semen PC @ 50 kg
0.0090 m³ Pasir ayak untuk beton
0.0150 m³ Batu pecah 2 - 3 (cm)
0.1000 Oh Pembantu Tukang
0.0330 Oh Tukang batu
0.0330 Oh Tukang kayu
0.0330 Oh Tukang besi / tukang las
0.0100 Oh Kepala tukang
0.0050 Oh Mandor
HARGA SATUAN (Rp.)
JUMLAH (Rp.)
BAHAN UPAH
3 4 5

1,540.00 357,280.00
264,140.00 137,352.80
218,260.00 170,242.80
67,000.00 110,550.00
70,000.00 17,500.00
80,000.00 2,000.00
85,000.00 6,800.00
801,725.60

1,540.00 335,720.00
264,140.00 137,352.80
231,240.00 201,178.80
67,000.00 110,550.00
70,000.00 17,500.00
80,000.00 2,000.00
85,000.00 6,800.00
811,101.60

1,540.00 431,200.00
264,140.00 118,863.00
455,520.00 409,968.00
67,000.00 110,550.00
70,000.00 17,500.00
80,000.00 2,000.00
85,000.00 6,800.00
1,096,881.00

1,540.00 565,180.00
264,140.00 116,221.60
218,260.00 192,068.80
67,000.00 134,000.00
70,000.00 24,500.00
80,000.00 2,800.00
85,000.00 85,000.00
1,119,770.40
22,800.00 23,940.00
30,500.00 457.50
67,000.00 469.00
70,000.00 490.00
80,000.00 56.00
85,000.00 25.50
25,438.00

67,000.00 134,000.00
134,000.00

2,950,000.00 118,000.00
18,400.00 5,520.00
45,000.00 4,500.00
67,000.00 20,100.00
70,000.00 1,820.00
80,000.00 2,080.00
85,000.00 425.00
152,445.00

2,950,000.00 132,750.00
18,400.00 5,520.00
45,000.00 4,500.00
67,000.00 20,100.00
70,000.00 1,820.00
80,000.00 2,080.00
85,000.00 425.00
167,195.00
964,715.15

2,950,000.00 118,000.00
18,400.00 7,360.00
45,000.00 9,000.00
2,705,000.00 40,575.00
183,500.00 64,225.00
30,800.00 61,600.00
67,000.00 20,100.00
70,000.00 23,100.00
80,000.00 2,640.00
85,000.00 510.00
347,110.00
4,005,649.40

2,950,000.00 118,000.00
18,400.00 7,360.00
45,000.00 9,000.00
2,705,000.00 48,690.00
183,500.00 64,225.00
30,800.00 61,600.00
67,000.00 21,440.00
70,000.00 23,100.00
80,000.00 2,640.00
80,000.00 480.00
356,535.00
3,084,027.75

2,950,000.00 118,000.00
18,400.00 7,360.00
45,000.00 9,000.00
2,705,000.00 40,575.00
183,500.00 64,225.00
30,800.00 184,800.00
67,000.00 21,440.00
70,000.00 23,100.00
80,000.00 2,640.00
85,000.00 510.00
471,650.00
3,928,844.50

1,540.00 520,520.00
264,140.00 171,691.00
218,260.00 141,869.00
67,000.00 402,000.00
70,000.00 70,000.00
80,000.00 8,000.00
85,000.00 25,500.00
1,339,580.00

2,950,000.00 590,000.00
18,400.00 27,600.00
45,000.00 18,000.00
22,800.00 3,420,000.00
30,500.00 68,625.00
1,540.00 497,420.00
264,140.00 137,352.80
218,260.00 170,242.80
67,000.00 261,300.00
70,000.00 24,500.00
70,000.00 72,800.00
70,000.00 73,500.00
80,000.00 19,600.00
85,000.00 14,025.00
5,394,965.60

2,950,000.00 796,500.00
18,400.00 36,800.00
45,000.00 27,000.00
22,800.00 4,560,000.00
30,500.00 91,500.00
1,540.00 497,420.00
264,140.00 137,352.80
218,260.00 170,242.80
67,000.00 324,950.00
70,000.00 24,500.00
70,000.00 109,200.00
80,000.00 112,000.00
80,000.00 26,480.00
85,000.00 14,450.00
6,928,395.60

2,950,000.00 944,000.00
18,400.00 58,880.00
45,000.00 72,000.00
22,800.00 3,420,000.00
30,500.00 68,625.00
1,540.00 497,420.00
264,140.00 137,352.80
455,520.00 355,305.60
2,705,000.00 324,600.00
183,500.00 513,800.00
30,800.00 985,600.00
67,000.00 388,600.00
70,000.00 24,500.00
70,000.00 196,000.00
455,520.00 478,296.00
80,000.00 33,600.00
85,000.00 15,725.00
8,514,304.40

2,950,000.00 5,900.00
18,400.00 184.00
16,500.00 49,500.00
30,500.00 13,725.00
1,540.00 6,160.00
264,140.00 1,584.84
218,260.00 1,964.34
67,000.00 4,020.00
70,000.00 1,400.00
70,000.00 1,400.00
70,000.00 1,400.00
80,000.00 480.00
85,000.00 255.00
87,973.18

2,950,000.00 8,850.00
24,000.00 480.00
16,500.00 59,400.00
30,500.00 1,525.00
1,540.00 8,470.00
132,400.00 1,191.60
455,520.00 6,832.80
67,000.00 6,700.00
8,750.00 288.75
70,000.00 2,310.00
70,000.00 2,310.00
80,000.00 800.00
85,000.00 425.00
99,583.15
PEKERJAAN PENUTUP ATAP

KODE
URAIAN PEKERJAAN
ANALISA

1 2
H. ANALISA BIAYA KONSTRUKSI PENUTUP ATAP

H.1 1 m² Pasang atap genteng kodok / glazzur


25.0000 bh Atap genteng kodok
0.1500 Oh Pembantu Tukang
0.0750 Oh Tukang kayu
0.0080 Oh Kepala tukang
0.0080 Oh Mandor

H.2 1 m' Pasang atap nok genteng kodok


5.0000 bh Bubungan atap (nok) genteng kodok
8.0000 kg Semen PC @ 50 kg
0.0320 m³ Pasir pasang kali
0.4000 Oh Pembantu Tukang
0.2000 Oh Tukang kayu
0.0200 Oh Kepala tukang
0.0020 Oh Mandor

H.3 1 m² Pasang roof light fibreglass uk. 180 cm x 90 cm


0.6000 lbr Rooflight fibreglass uk. 1,8 x 0,9 (m)
0.0500 kg Paku ukuran 2 -5 cm
0.1400 Oh Pembantu Tukang
0.0670 Oh Tukang kayu
0.0070 Oh Kepala tukang
0.0070 Oh Mandor

H.4 1 m' Pasang atap nok alumunium


1.2000 m² Bubungan atap (nok) alumunium standar 40 cm, swg. 22
0.0400 kg Paku kait
0.1000 Oh Pembantu Tukang
1.0000 Oh Tukang kayu
0.0100 Oh Kepala tukang
0.0100 Oh Mandor

H.5 1 m² Pasang atap alumunium super sheet


1.0500 m² Atap alumunium super sheet uk. 1,8 x 6 (m), t = 0,2 mm (berwarna)
0.0200 kg Paku kait
0.1500 Oh Pembantu Tukang
0.7500 Oh Tukang kayu
0.0080 Oh Kepala tukang
0.0060 Oh Mandor

H.6 1 m² Pasang Aluminium Foil


1.0500 m² Aluminium foil
0.2000 Oh Pembantu Tukang
0.0200 Oh Tukang kayu
0.0020 Oh Kepala tukang
0.0080 oh Mandor

H.7 1 m² Pasang atap metal batuan /tekstur


1.0200 lbr Atap metal batuan /tekstur
0.2000 kg Paku anti Karat
0.2000 Oh Pembantu Tukang
0.1000 Oh Tukang kayu
0.0100 Oh Kepala tukang
0.0100 Oh Mandor
P

HARGA SATUAN (Rp.)


JUMLAH (Rp.)
BAHAN UPAH
3 4 5

3,500.00 87,500.00
67,000.00 10,050.00
70,000.00 5,250.00
80,000.00 640.00
85,000.00 680.00
104,120.00

5,000.00 25,000.00
1,540.00 12,320.00
241,390.00 7,724.48
67,000.00 26,800.00
70,000.00 14,000.00
80,000.00 1,600.00
85,000.00 170.00
87,614.48

110,000.00 66,000.00
24,000.00 1,200.00
67,000.00 9,380.00
70,000.00 4,690.00
80,000.00 560.00
85,000.00 595.00
82,425.00

41,500.00 49,800.00
1,000.00 40.00
67,000.00 6,700.00
70,000.00 70,000.00
80,000.00 800.00
85,000.00 850.00
128,190.00

155,000.00 162,750.00
1,000.00 20.00
67,000.00 10,050.00
70,000.00 52,500.00
80,000.00 640.00
85,000.00 510.00
226,470.00

20,000.00 21,000.00
67,000.00 13,400.00
70,000.00 1,400.00
80,000.00 160.00
85,000.00 680.00
36,640.00

11,000.00 11,220.00
850.00 170.00
70,000.00 14,000.00
70,000.00 7,000.00
80,000.00 800.00
- -
33,190.00
PEKERJAAN LANGIT -LANGIT

KODE
URAIAN PEKERJAAN
ANALISA

1 2
I. ANALISA BIAYA KONSTRUKSI LANGIT - LANGIT

I.2 1 m² Langit-langit asbes 1 m x 1 m, tebal 5 mm


1.1000 lbr Eternit asbes uk. 1 x 1 (m), tebal 5 mm
0.0100 kg Paku berbagai ukuran 2 - 5 cm
0.0300 Oh Pembantu Tukang
0.0700 Oh Tukang kayu
0.0070 Oh Kepala tukang
0.0015 Oh Mandor

I.5 1 m² Langit-langit akustik uk. 30 cm x 60 cm + rangka alumunium


0.5600 lbr Langit-langit Accoustic board / tile uk. 0,30 x 0,60 (m)
0.8500 m' Profil aluminium T
0.1500 kg Kawat seng polos
0.0100 kg Dina bolt / ramset
0.0300 Oh Pembantu Tukang
0.0700 Oh Tukang kayu
0.0070 Oh Kepala tukang
0.0015 Oh Mandor

I.6 1 m² Langit-langit akustik uk. 60 cm x 120 cm + rangka alumunium


1.5000 lbr Langit-langit Accoustic board / tile uk. 0,60 x 1,20 x 0,14 (m)
3.6000 m' Profil Aluminium T
0.1500 kg Kawat seng polos
0.0100 kg Dina bolt / ramset
0.1500 Oh Pembantu Tukang
0.5000 Oh Tukang kayu
0.0500 Oh Kepala tukang
0.0075 Oh Mandor

I.13 1 m² Langit-langit gypsum board, tebal 9 mm


0.3640 lbr Gypsum board polos uk. 1.22 x 2.44 (m), tebal 9 mm
0.1100 kg Paku sekrup
0.1000 Oh Pembantu Tukang
0.0500 Oh Tukang kayu
0.0050 Oh Kepala tukang
0.0050 Oh Mandor

I.16 1 m² Langit-langit plywood tebal 4 mm + rangka kayu kelas III


0.3900 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm
0.0600 kg Paku ukuran 7 - 15 cm
0.0230 m³ Kayu Balok Terentang
0.2700 Oh Pembantu Tukang
0.4000 Oh Tukang kayu
0.0400 Oh Kepala tukang
0.0135 Oh Mandor

I.17 1 m² Kompon Gypsum (nonSNI)


0.3640 lbr Kompon gypsum
0.1100 kg Kain kassa
0.1000 Oh Pembantu Tukang
0.0500 Oh Tukang kayu
0.0050 Oh Kepala tukang
0.0050 Oh Mandor

I.18 1 m² Amplas Gypsum (non SNI)


0.3640 lbr Amplas
0.1000 Oh Pembantu Tukang
0.0500 Oh Tukang kayu
0.0050 Oh Kepala tukang
0.0050 Oh Mandor

I.19 1 m' List langit-langit kayu profil


1.1000 m' List Profil Kamper 4 cm
0.0100 kg Paku ukuran 8 -15 cm
0.0500 Oh Pembantu Tukang
0.0500 Oh Tukang kayu
0.0050 Oh Kepala tukang
0.0030 Oh Mandor
T

HARGA SATUAN (Rp.)


JUMLAH (Rp.)
BAHAN UPAH
3 4 5

25,000.00 27,500.00
24,000.00 240.00
67,000.00 2,010.00
70,000.00 4,900.00
80,000.00 560.00
85,000.00 127.50
35,337.50

70,000.00 39,200.00
98,800.00 83,980.00
20,300.00 3,045.00
8,000.00 80.00
67,000.00 2,010.00
70,000.00 4,900.00
80,000.00 560.00
85,000.00 127.50
133,902.50

146,500.00 219,750.00
98,800.00 355,680.00
20,300.00 3,045.00
8,000.00 80.00
67,000.00 10,050.00
70,000.00 35,000.00
80,000.00 4,000.00
85,000.00 637.50
628,242.50

87,800.00 31,959.20
850.00 93.50
67,000.00 6,700.00
70,000.00 3,500.00
80,000.00 400.00
85,000.00 425.00
43,077.70
68,500.00 26,715.00
18,400.00 1,104.00
2,705,000.00 62,215.00
67,000.00 18,090.00
70,000.00 28,000.00
80,000.00 3,200.00
85,000.00 1,147.50
140,471.50

47,700.00 17,362.80
35,500.00 3,905.00
67,000.00 6,700.00
70,000.00 3,500.00
80,000.00 400.00
85,000.00 425.00
32,292.80

11,900.00 4,331.60
67,000.00 6,700.00
70,000.00 3,500.00
80,000.00 400.00
85,000.00 425.00
15,356.60

10,500.00 11,550.00
18,400.00 184.00
67,000.00 3,350.00
70,000.00 3,500.00
80,000.00 400.00
85,000.00 255.00
19,239.00
PEKERJAAN PIPA & SANITASI

KODE
URAIAN PEKERJAAN
ANALISA

1 2
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA & SANITASI

J.1 Memasang 1 buah klosed duduk / monoblock


6.0000 kg Semen PC @ 50 kg
0.0100 m³ Pasir pasang
1.0000 Oh Pembantu Tukang
1.0000 Oh Tukang batu
0.1000 Oh Kepala tukang
0.1000 Oh Mandor

J.2 Memasang 1 buah wastafel


1.0000 bh Wastafel INA
12.0000 % Perlengkapan (dari harga wastafel)
6.0000 kg Semen PC @ 50 kg
0.0100 m³ Pasir pasang kali
1.2000 Oh Pembantu Tukang
1.4500 Oh Tukang batu
0.1500 Oh Kepala tukang
0.1000 Oh Mandor

J.3 Memasang 1 buah bak beton vol. 1 m³ air dengan porselin 11 cm x 11 cm


0.9000 m³ Beton adukan 1 pc : 1 ps : 2 krk
180.0000 kg Besi beton U-24
0.8000 m³ Kayu Papan Terentang
1,115.0000 bh Porcelaint uk. 11 cm x 11 cm
10.0000 % Perlengkapan (dari harga total bahan)
3.5000 Oh Pembantu Tukang
4.5000 Oh Tukang batu
0.9000 Oh Kepala tukang
0.9000 Oh Mandor

J.4 Memasang 1 m' pipa beton ø 15 cm - 20 cm


1.1000 bh Pipa beton ø 20 cm, panjang 1 m'
13.0000 bh Batu bata merah (lokal)
3.9200 kg Semen PC @ 50 kg
0.0560 m³ Pasir pasang kali
0.0240 m³ Pasir urug / timbun
0.1400 Oh Pembantu Tukang
0.0700 Oh Tukang batu
0.0070 Oh Kepala tukang
0.0070 Oh Mandor

J.5 Memasang 1 m' pipa galvanis ø 1/2"


1.2000 m' Pipa besi galvanis ø 0,5 (inch)
35.0000 % Perlengkapan (dari harga pipa)
0.0540 Oh Pembantu Tukang
0.0900 Oh Tukang batu
0.0090 Oh Kepala tukang
0.0270 Oh Mandor

J.6 Memasang 1 m' pipa galvanis ø 1"


1.2000 m' Pipa besi galvanis ø 1 (inch)
35.0000 % Perlengkapan (dari harga pipa)
0.0540 Oh Pembantu Tukang
0.0900 Oh Tukang batu
0.0090 Oh Kepala tukang
0.0270 Oh Mandor

J.7 Memasang 1 m' pipa galvanis ø 2"


1.2000 m' Pipa besi galvanis ø 2 (inch)
35.0000 % Perlengkapan (dari harga pipa)
0.1080 Oh Pembantu Tukang
0.1800 Oh Tukang batu
0.0180 Oh Kepala tukang
0.0054 Oh Mandor

J.8 Memasang 1 m' pipa PVC tipe AW ø 1/2"


1.2000 m' Pipa PVC ø 1/2 (inch) AW, panjang 4 m
35.0000 % Perlengkapan (dari harga pipa)
0.0360 Oh Pembantu Tukang
0.0600 Oh Tukang batu
0.0060 Oh Kepala tukang
0.0018 Oh Mandor

J.9 Memasang 1 m' pipa PVC tipe AW ø 1"


1.2000 m' Pipa PVC ø 1(inch) AW, panjang 4 m
35.0000 % Perlengkapan (dari harga pipa)
0.0360 Oh Pembantu Tukang
0.0600 Oh Tukang batu
0.0060 Oh Kepala tukang
0.0018 Oh Mandor

J.10 Memasang 1 bh kran air ø 3/4" atau 1/2"


1.0000 bh Kran air ø 0,75 (inch)
0.0250 bh seal tape
0.0100 Oh Pembantu Tukang
0.1000 Oh Tukang batu
0.0100 Oh Kepala tukang
0.0050 Oh mandor

J.11 Memasang 1 bh floor drain


1.0000 bh Floor drain
0.0100 Oh Pembantu Tukang
0.1000 Oh Tukang batu
0.0100 Oh Kepala tukang
0.0050 Oh Mandor

J.12 Memasang 1 bh tempat sabun keramik (non SNI)


1.0000 bh Tempat sabun keramik
0.0020 kg Semen putih
0.1000 Oh Tukang batu
0.0100 Oh Kepala tukang

J.13 Memasang 1 bh septic tank, volume air 2 m³ (non SNI)


7.4340 m³ Galian tanah
4.0760 m³ Urugan kembali
0.7200 m³ Pas. dinding bata merah tebal 1/2 bata ad. 1 : 4
7.1344 m² Pas. plesteran dinding dalam bak ad. 1 : 2, tebal 15 mm
0.1120 m³ Pas. kolom beton bertulang ad. 1 : 2 : 3
0.2600 m³ Pas. sloof beton bertulang ad. 1 : 2 : 3
0.0400 m³ Pas. ringbalk beton bertulang ad. 1 : 2 : 3
5.2000 m² Pas. lantai bak beton tumbuk ad. 1 : 3 : 6
0.6000 m' Pas. pipa galvanis ø 1,5"
SI

HARGA SATUAN (Rp.)


JUMLAH (Rp.)
BAHAN UPAH
3 4 5

1,540.00 9,240.00
94,900.00 949.00
67,000.00 67,000.00
70,000.00 70,000.00
80,000.00 8,000.00
85,000.00 8,500.00
2,701,939.00

227,500.00 227,500.00
- 27,300.00
1,398.00 8,388.00
1,958.00 19.58
67,000.00 80,400.00
70,000.00 101,500.00
80,000.00 12,000.00
80,000.00 8,000.00
465,107.58

1,096,881.00 987,192.90
22,800.00 4,104,000.00
2,705,000.00 2,164,000.00
2,400.00 2,676,000.00
- 993,119.29
67,000.00 234,500.00
70,000.00 315,000.00
80,000.00 72,000.00
80,000.00 72,000.00
11,617,812.19

141,200.00 155,320.00
750.00 9,750.00
1,958.00 7,675.36
264,140.00 14,791.84
92,300.00 2,215.20
67,000.00 9,380.00
70,000.00 4,900.00
80,000.00 560.00
95,496.24 668.47
205,260.87

65,700.00 78,840.00
- 27,594.00
67,000.00 3,618.00
70,000.00 6,300.00
80,000.00 720.00
80,000.00 2,160.00
119,232.00

134,600.00 161,520.00
- 56,532.00
67,000.00 3,618.00
70,000.00 6,300.00
70,000.00 630.00
80,000.00 2,160.00
230,760.00

134,600.00 161,520.00
- 56,532.00
67,000.00 7,236.00
70,000.00 12,600.00
80,000.00 1,440.00
80,000.00 432.00
239,760.00

7,200.00 8,640.00
- 3,024.00
67,000.00 2,412.00
70,000.00 4,200.00
80,000.00 480.00
80,000.00 144.00
18,900.00

12,700.00 15,240.00
- 5,334.00
67,000.00 2,412.00
70,000.00 4,200.00
80,000.00 480.00
80,000.00 144.00
27,810.00

137,500.00 137,500.00
- 34.38
67,000.00 670.00
70,000.00 7,000.00
80,000.00 800.00
80,000.00 400.00
146,404.38

48,400.00 48,400.00
67,000.00 670.00
67,000.00 6,700.00
80,000.00 800.00
80,000.00 400.00
56,970.00

1,115,000.00 1,115,000.00
102,000.00 204.00
70,000.00 7,000.00
80,000.00 800.00
1,123,004.00

39,250.00 291,784.50
233,071.72 950,000.34
128,442.34 92,478.48
38,785.80 276,713.41
8,514,304.40 953,602.09
6,928,395.60 1,801,382.86
99,583.15 3,983.33
801,725.60 4,168,973.12
221,100.00 132,660.00
8,671,578.12
PEKERJAAN CAT & TALANG

KODE
URAIAN PEKERJAAN
ANALISA

1 2
K. ANALISA BIAYA KONSTRUKSI CAT & TALANG

K.1 1 m² Mengecat tembok baru (1 lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup)
0.1000 kg Cat dasar
0.2600 kg Cat tembok vinilex
0.0250 kg Plamuer
0.0200 Oh Pembantu Tukang
0.0630 Oh Tukang cat
0.0063 Oh Kepala tukang
0.0025 Oh Mandor

K.2 1 m² Mengecat bidang kayu baru (1lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup)
0.2000 kg Cat menie
0.1500 kg Plamuer
0.1700 kg Cat dasar
0.2600 kg Cat minyak
0.0700 Oh Pembantu Tukang
0.0090 Oh Tukang cat
0.0060 Oh Kepala tukang
0.0025 Oh Mandor

K.3 1 m² Mengecat Genteng


0.3000 ltr Cat genteng
0.1000 Oh Pembantu Tukang
0.1500 Oh Tukang cat
0.0150 Oh Kepala tukang
0.0050 Oh Mandor

K.4 1 m² Mengeter rangka kayu


0.3500 kg Ter
0.1000 Oh Pembantu Tukang
0.0060 Oh Mandor

K.5 1 m² Mengapur dinding baru


0.1500 kg Kapur sirih
0.1000 lbr Amplas
0.2500 ikat Alang-alang
0.0020 M³ Kayu untuk perancah
0.0600 Oh Pembantu Tukang
0.0100 Oh Tukang cat
0.0010 Oh Kepala tukang
0.0025 Oh Mandor

K.6 1 m² Memeni besi 2X


0.1000 kg Cat menie
0.0100 bh Kuas uk. 3"
0.0200 Oh Pembantu Tukang
0.2000 Oh Tukang cat
0.0200 Oh Kepala tukang
0.0100 Oh Mandor

K.7 1 m' Pasang talang datar, seng BJLS 27


0.5000 lbr Seng plat BJLS 27 uk. 0.9 x 1.83 (m)
0.0150 kg Paku berbagai ukuran (1/2" - 1")
0.0096 m³ Kayu gergajian kelas II, papan
0.0250 kg Cat menie
0.1500 Oh Pembantu Tukang
0.4000 Oh Tukang kayu
0.0250 Oh Kepala tukang
0.0013 Oh Mandor

K.8 1 m' Pasang talang miring, seng BJLS 27


0.5000 lbr Seng plat BJLS 27 uk. 0.9 x 1.83 (m)
0.0150 kg Paku ukuran 8 -15 cm
0.0019 m³ Kayu Papan terentang
0.3000 kg Menie besi
0.1500 Oh Pembantu Tukang
0.4000 Oh Tukang kayu
0.0250 Oh Kepala tukang
0.0013 Oh Mandor

K.9 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng BJLS 27


0.3000 lbr Seng plat BJLS 27 uk. 0.9 x 1.83 (m)
0.1000 kg Paku ukuran 8 -15cm
0.5000 m³ Besi strip
0.1500 Oh Pembantu Tukang
0.2500 Oh Tukang kayu
0.0250 Oh Kepala tukang
G

HARGA SATUAN (Rp.)


m
BAHAN UPAH
3 4 5

35,000.00 3,500.00
27,500.00 7,150.00
27,500.00 687.50
67,000.00 1,340.00
70,000.00 4,410.00
80,000.00 504.00
85,000.00 212.50
17,804.00

33,500.00 6,700.00
27,500.00 4,125.00
32,700.00 5,559.00
42,300.00 10,998.00
67,000.00 4,690.00
80,000.00 720.00
80,000.00 480.00
85,000.00 212.50
33,484.50

30,693.00 9,207.90
70,000.00 7,000.00
70,000.00 10,500.00
80,000.00 1,200.00
85,000.00 425.00
62,029.90

8,977.50 3,142.13
67,000.00 6,700.00
85,000.00 510.00
10,352.13

37,100.00 5,565.00
5,500.00 550.00
1,500.00 375.00
1,209,000.00 2,418.00
67,000.00 4,020.00
80,000.00 800.00
80,000.00 80.00
85,000.00 212.50
14,020.50

33,500.00 3,350.00
16,500.00 165.00
67,000.00 1,340.00
70,000.00 14,000.00
80,000.00 1,600.00
85,000.00 850.00
21,305.00

70,600.00 35,300.00
28,200.00 423.00
3,574,100.00 34,311.36
18,405.00 460.13
67,000.00 10,050.00
79,228.75 31,691.50
80,000.00 2,000.00
85,000.00 106.25
114,342.24

58,120.00 29,060.00
18,400.00 276.00
2,950,000.00 5,605.00
30,600.00 9,180.00
67,000.00 10,050.00
70,000.00 28,000.00
80,000.00 2,000.00
85,000.00 106.25
84,277.25

58,120.00 17,436.00
18,400.00 1,840.00
53,550.00 26,775.00
67,000.00 10,050.00
70,000.00 17,500.00
85,000.00 2,125.00
75,726.00
PEKERJAAN LANTAI & KERAMIK

KODE
URAIAN PEKERJAAN
ANALISA

1 2
L. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANTAI KERAMIK

L.6 1 m² Pasangan lantai keramik 30 cm x 30 cm


1.0000 m² Keramik 30 x 30 (cm) terang
11.3800 kg Semen PC @ 50 kg
0.0420 m³ Pasir pasang kali
1.5000 kg Semen warna
0.6200 Oh Pembantu Tukang
0.3500 Oh Tukang batu
0.0350 Oh Kepala tukang
0.0300 Oh Mandor

L.7 1 m² Pasangan lantai keramik 40 cm x 40 cm


1.0000 m² Keramik 40 x 40 (cm) putih / berwarna
11.3800 kg Semen PC @ 50 kg
0.0420 m³ Pasir pasang kali
1.5000 kg Semen warna
0.6200 Oh Pembantu Tukang
0.3500 Oh Tukang batu
0.0350 Oh Kepala tukang
0.0300 Oh Mandor

L.8 1 m² Pasangan lantai ubin granito 40 cm x 40 cm


1.0000 m² ubin granito 40 x 40 cm
9.8000 kg Semen PC @ 50 kg
0.0215 m³ Pasir pasang kali
1.3000 kg Semen warna
0.2500 Oh Pembantu Tukang
0.1200 Oh Tukang batu
0.0120 Oh Kepala tukang
0.0125 Oh Mandor

L.10 1 m' Pasangan plint ubin granito 10 cm x 40 cm


2.6500 bh plint ubin granito 10 x 40 cm
1.2000 kg Semen PC @ 50 kg
0.0030 m³ Pasir pasang kali
0.1000 kg Semen warna
0.0600 Oh Pembantu Tukang
0.0300 Oh Tukang batu
0.0030 Oh Kepala tukang
0.0030 Oh Mandor

L.13 1 m' Pasangan plint keramik 10 cm x 15 cm


6.6700 bh Plint keramik 10 x 15 cm
1.6500 kg Semen PC @ 50 kg
0.0032 m³ Pasir pasang kali
0.1000 kg Semen warna
0.0900 Oh Pembantu Tukang
0.0900 Oh Tukang batu
0.0090 Oh Kepala tukang
0.0045 Oh Mandor

L.20 1 m² Pasangan dinding batu tempel hitam


1.0500 m² Batu alam tempel
11.7500 m³ Semen PC @ 50 kg
0.0350 m³ Pasir pasang kali
0.6200 kg Semen warna
0.3500 Oh Pembantu Tukang
0.0350 Oh Tukang batu
0.0300 Oh Kepala tukang

L.21 1 m² Pasangan plint kayu 10 x 20 cm


0.0024 m³ Kayu Papan Terentang
0.0500 kg Paku sekrup
0.1200 Oh Pembantu Tukang
0.1200 Oh Tukang kayu
0.0120 Oh Kepala tukang
0.0060 Oh Mandor

L.22 1 m² Pasangan lantai dari conblock, tebal 6 cm


1.0000 m² Conblock tebal 6 cm
0.0500 Oh Pembantu Tukang
0.1600 Oh Tukang batu
0.0100 Oh Kepala tukang
0.2500 Oh Mandor
MIK

HARGA SATUAN (Rp.)


JUMLAH (Rp.)
BAHAN UPAH
3 4 5

60,500.00 60,500.00
1,540.00 17,525.20
241,390.00 10,138.38
16,200.00 24,300.00
67,000.00 41,540.00
70,000.00 24,500.00
80,000.00 2,800.00
85,000.00 2,550.00
183,853.58

95,300.00 95,300.00
1,540.00 17,525.20
241,390.00 10,138.38
16,200.00 24,300.00
67,000.00 41,540.00
70,000.00 24,500.00
80,000.00 2,800.00
85,000.00 2,550.00
218,653.58

380,000.00 380,000.00
1,540.00 15,092.00
16,200.00 348.30
16,200.00 21,060.00
67,000.00 16,750.00
70,000.00 8,400.00
80,000.00 960.00
85,000.00 1,062.50
443,672.80

3,000.00 7,950.00
1,540.00 1,848.00
15,000.00 45.00
16,200.00 1,620.00
67,000.00 4,020.00
70,000.00 2,100.00
80,000.00 240.00
85,000.00 255.00
18,078.00

5,000.00 33,350.00
1,540.00 2,541.00
241,390.00 772.45
15,000.00 1,500.00
67,000.00 6,030.00
70,000.00 6,300.00
80,000.00 720.00
85,000.00 382.50
51,595.95

605,500.00 635,775.00
1,540.00 18,095.00
241,390.00 8,448.65
15,000.00 9,300.00
67,000.00 23,450.00
70,000.00 2,450.00
80,000.00 2,400.00
699,918.65

2,950,000.00 7,080.00
1,800.00 90.00
67,000.00 8,040.00
80,000.00 9,600.00
80,000.00 960.00
85,000.00 510.00
26,280.00

2,700.00 2,700.00
67,000.00 3,350.00
70,000.00 11,200.00
80,000.00 800.00
85,000.00 21,250.00
39,300.00
PEKERJAAN BESI, ALUMUNIUM & KACA

KODE
URAIAN PEKERJAAN
ANALISA

1 2
M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI ALUMUNIUM KACA

M.1 1 kg Pasang rangka atap baja


1.1000 kg Besi baja profil IWF
0.0800 kg Cat menie
0.0600 Oh Pembantu Tukang
0.0060 Oh Tukang besi / tukang las
0.0060 Oh Kepala tukang
0.0003 Oh Mandor

M.2 1 m² Pasang rolling door


1.0000 m² Rolling dor - alumunium tipis
1.0500 Oh Pembantu tukang
1.5000 Oh Tukang besi / tukang las
0.1050 Oh Kepala tukang
0.0052 Oh Mandor

M.3 1 m² Pasang kusen pintu / jendela alumunium biasa


1.0000 m² Kusen pintu / jendela alumunium 3"
1.0500 Oh Pembantu tukang
1.0500 Oh Tukang besi / tukang las
0.1050 Oh Kepala tukang

M.4 1 m² Pasang pintu alumunium biasa


1.0000 m² Pintu alumunium - swing + door closer
1.0500 Oh Pembantu Tukang
1.0500 Oh Tukang besi / tukang las
0.1050 Oh Kepala tukang
0.0052 Oh Mandor

M.5 1 m² Pasang teralis besi


11.5000 m' Besi strip 2 x 3
1.2000 Oh Pembantu Tukang
1.2000 Oh Tukang besi / tukang las
0.0120 Oh Kepala tukang
0.0006 Oh Mandor

M.6 1 m² Pasang kawat kassa, dengan rangka kayu kelas III


1.1000 m² Kawat kassa / kawat loket
0.0200 kg Paku Ukuran 8 - 15 cm
0.0018 m³ Kayu Papan terentang
0.1000 Oh Pembantu tukang
0.1000 Oh Tukang kayu
0.0010 Oh Kepala tukang
0.0005 Oh Mandor

M.7 1 m² Pasang vertical blinds


1.0000 m² Vertical blinds
0.3500 Oh Pembantu Tukang
0.3500 Oh Tukang kayu
0.0350 Oh Kepala tukang
0.0018 Oh Mandor

M.8 1 m² Pasang kaca bening tebal 8 mm


1.1000 m² Kaca bening tebal 8 mm
0.0165 Oh Pembantu Tukang
0.1650 Oh Tukang kayu
0.0165 Oh Kepala tukang
0.0008 Oh Mandor

M.9 1 m² Pasang kaca buram, tebal 12 mm


1.1000 m² Kaca buram tebal 12 mm
0.0500 kg Sealent
0.0250 Oh Pembantu tukang
0.2500 Oh Tukang kayu
0.0250 Oh Kepala tukang
0.0013 Oh Mandor
& KACA

HARGA SATUAN (Rp.)


JUMLAH (Rp.)
BAHAN UPAH
3 4 5

26,400.00 29,040.00
30,600.00 2,448.00
67,000.00 4,020.00
70,000.00 420.00
80,000.00 480.00
85,000.00 25.50
36,433.50

414,800.00 414,800.00
67,000.00 70,350.00
70,000.00 105,000.00
80,000.00 8,400.00
85,000.00 442.00
598,550.00

612,100.00 612,100.00
67,000.00 70,350.00
70,000.00 73,500.00
80,000.00 8,400.00
764,350.00

2,356,300.00 2,356,300.00
67,000.00 70,350.00
70,000.00 73,500.00
80,000.00 8,400.00
85,000.00 442.00
2,508,550.00

29,500.00 339,250.00
67,000.00 80,400.00
70,000.00 84,000.00
80,000.00 960.00
85,000.00 51.00
504,610.00

35,500.00 39,050.00
18,400.00 368.00
2,950,000.00 5,310.00
67,000.00 6,700.00
70,000.00 7,000.00
80,000.00 80.00
85,000.00 42.50
58,508.00

5,250.00 5,250.00
67,000.00 23,450.00
70,000.00 24,500.00
80,000.00 2,800.00
85,000.00 148.75
56,000.00

201,500.00 221,650.00
67,000.00 1,105.50
70,000.00 11,550.00
80,000.00 1,320.00
85,000.00 68.00
235,625.50

432,000.00 475,200.00
65,000.00 3,250.00
67,000.00 1,675.00
70,000.00 17,500.00
80,000.00 2,000.00
85,000.00 106.25
499,625.00
PEKERJAAN KUNCI, ENGSEL, dan KAIT

KODE
URAIAN PEKERJAAN
ANALISA

1 2
N. ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI, ENGSEL, dan KAIT

N.1 1 Buah pasang kunci tanam antik


1.0000 bh Kunci tanam antik
0.0600 Oh Pembantu tukang
0.6000 Oh Tukang kayu
0.0600 Oh Kepala tukang
0.0030 Oh Mandor

N.2 1 Buah pasang kunci tanam


1.0000 bh Kunci tanam
0.0100 Oh pembantu tukang
0.5000 Oh Tukang kayu
0.0100 Oh Kepala tukang
0.0050 Oh Mandor

N.3 1 Buah pasang kunci tanam kamar mandi


1.0000 bh Kunci tanam kamar mandi
0.0050 Oh Pembantu tukang
0.5000 Oh Tukang kayu
0.0050 Oh Kepala tukang
0.0025 Oh Mandor

N.4 1 Buah pasang engsel pintu/jendela 4"


1.0000 bh Engsel pintu / jendela 4"

0.0150 Oh Pembantu tukang


0.1500 Oh Tukang kayu
0.0150 Oh Kepala tukang
0.0008 Oh Mandor

N.5 1 Buah pasang kunci slot


1.0000 bh Slot pintu
0.0200 Oh Pembantu tukang
0.2000 Oh Tukang kayu
0.0200 Oh Kepala tukang
0.0010 Oh Mandor

N.6 1 Buah pasang rel pintu dorong


1.0000 bh Rel pintu dorong
0.0600 Oh Pembantu tukang
0.6000 Oh Tukang kayu
0.0600 Oh Kepala tukang
0.0030 Oh Mandor

N.7 1 Buah pasang kunci lemari


1.0000 bh Kunci lemari
0.0250 Oh Pembantu tukang
0.2500 Oh Tukang kayu
0.0250 Oh Kepala tukang
0.0013 Oh Mandor
n KAIT

HARGA SATUAN (Rp.)


JUMLAH (Rp.)
BAHAN UPAH
3 4 5

150,000.00 150,000.00
67,000.00 4,020.00
70,000.00 42,000.00
80,000.00 4,800.00
85,000.00 255.00
201,075.00

139,500.00 139,500.00
67,000.00 670.00
70,000.00 35,000.00
80,000.00 800.00
85,000.00 425.00
176,395.00

63,500.00 63,500.00
67,000.00 335.00
70,000.00 35,000.00
80,000.00 400.00
85,000.00 212.50
99,447.50

16,500.00 16,500.00
67,000.00 1,005.00
70,000.00 10,500.00
80,000.00 1,200.00
85,000.00 63.75
29,268.75

35,000.00 35,000.00
67,000.00 1,340.00
70,000.00 14,000.00
80,000.00 1,600.00
85,000.00 85.00
52,025.00

220,600.00 220,600.00
67,000.00 4,020.00
70,000.00 42,000.00
80,000.00 4,800.00
85,000.00 255.00
271,675.00

55,500.00 55,500.00
67,000.00 1,675.00
70,000.00 17,500.00
80,000.00 2,000.00
85,000.00 106.25
76,781.25
PEKERJAAN PINTU

KODE
URAIAN PEKERJAAN
ANALISA

1 2
O. ANALISA BIAYA KONSTRUKSI PEKERJAAN PINTU

P.1 Memasang 1 Unit Pintu Type PD1 (Pintu Pagar Utama)

0.4250 M3 Beton Balok/Kolom Lintle 25/25


10.5600 M2 Dinding Granit Tile 40x40 " Indogress"
2.0000 Unit Pintu alumunium - swing + floorhinge
7.0000 bh Paku Skrup
7.0000 bh Pisher
1.0000 Ls Upah Pasang
1.0000 Ls Alat Bantu

P.1 Memasang 1 Unit Dual Pintu

8.3000 M1 Kusen Aluminium Warna 4"


3.2250 M2 Daun Pintu Panel Multi,rangka kayu kamper
4.0000 M' List Karet Kaca
13.6000 M' Sealan Karet Kusen
1.5000 Psg Engsel Pintu
1.0000 Bh Kunci Pintu Double slaag
0.7250 M2 Kaca Polos 5 mm
8.0000 bh Paku Skrup
8.0000 bh Pisher
1.0000 Ls Upah Pasang
1.0000 Ls Alat Bantu

P.1 Memasang 1 Unit Pintu Type Kamar

6.9000 M1 Kusen Aluminium Warna 4"


1.0000 Unit Pintu alumunium - swing + door closer
13.8000 M' Sealan Karet Kusen
7.0000 bh Paku Skrup
7.0000 bh Pisher
1.0000 Ls Upah Pasang
1.0000 Ls Alat Bantu

P.1 Memasang 1 Unit Pintu TypePVC

1.0000 Unit Kusen +Daun Pintu PVC lengkap engsel/kunci


8.0000 bh Paku Skrup
8.0000 bh Pisher
1.0000 Ls Upah Pasang
1.0000 Ls Alat Bantu
P.1 Memasang 1 Unit Pintu Type Kantor

12.2500 M' Kusen Aluminium Warna 4"


9.5000 M' Sealan Karet Kusen
5.7750 M2 Kaca Polos 5 mm
15.2000 M' List Karet
8.0000 bh Paku Skrup
8.0000 bh Pisher
1.0000 Ls Upah Pasang
1.0000 Ls Alat Bantu
HARGA SATUAN (Rp.)
JUMLAH (Rp.)
BAHAN UPAH
3 4 5

5,552,811.00 2,359,944.68
350,000.00 3,696,000.00
3,549,400.00 7,098,800.00
1,500.00 10,500.00
5,500.00 38,500.00
1,069,500.00 1,069,500.00 7,130,000.00 0.1500
356,500.00 356,500.00 7,130,000.00 0.0500
14,629,744.68

125,000.00 1,037,500.00

508,232.00 1,639,048.20

3,000.00 12,000.00

2,500.00 34,000.00

23,100.00 34,650.00

104,000.00 104,000.00

220,600.00 159,935.00

1,500.00 12,000.00

5,500.00 44,000.00

455,670.00 455,670.00 3,037,800.00 0.1500


151,890.00 151,890.00 3,037,800.00 0.0500
3,684,693.20

125,000.00 862,500.00
2,356,300.00 2,356,300.00
2,500.00 34,500.00
1,500.00 10,500.00
5,500.00 38,500.00
164,240.00 164,240.00 3,284,800.00 0.1500
164,240.00 164,240.00 3,284,800.00 0.0500
3,630,780.00

350,000.00 350,000.00
1,500.00 12,000.00
5,500.00 44,000.00
57,900.00 57,900.00 386,000.00 0.1500
19,300.00 19,300.00 386,000.00 0.0500
483,200.00

125,000.00 1,531,250.00
2,500.00 23,750.00
122,100.00 705,127.50
2,500.00
1,500.00 12,000.00
5,500.00 -
358,954.80 358,954.80 2,393,032.00 0.1500
119,651.60 119,651.60 2,393,032.00 0.0500
2,750,733.90
PEKERJAAN ELEKTRIKAL

KODE
URAIAN PEKERJAAN
ANALISA

1 2
P. ANALISA BIAYA KONSTRUKSI PEKERJAAN ELEKTRIKAL

P.1 Instalasi Lampu dan Kontak pertitik


11.0000 m1 Kabel listrik NYA 3x2,5 mm
1.0000 ttk Downlight
0.4800 Oh Pembantu Tukang
0.48 Oh Tukang Listrik
0.048 Oh Kepala Tukang
0.004 Oh Mandor

P.2 Pekerjaan Stop Kontak per buah


1.0000 bh Stop Kontak
0.200 Oh Pembantu Tukang
0.20 Oh Tukang Listrik
0.02 Oh Kepala Tukang
0.0020 Oh Mandor

P.3 Pekerjaan Lampu 18 watt per buah


1.0000 bh Instalasi titik Lampu + stop kontak
0.200 Oh Pembantu Tukang
0.20 Oh Tukang Listrik
0.02 Oh Kepala Tukang
0.0020 Oh Mandor

P.4 Pekerjaan MCB BOX per buah


1.0000 bh MCB Box
0.200 Oh Pembantu Tukang
0.20 Oh Tukang Listrik
0.02 Oh Kepala Tukang
0.0020 Oh Mandor

P.5 Pekerjaan Saklar Ganda per buah


1.0000 bh Saklar Ganda
0.200 Oh Pembantu Tukang
0.200 Oh Tukang Listrik
0.02 Oh Kepala Tukang
0.0020 Oh Mandor

P.6 Pekerjaan Lampu Taman per buah


1.0000 bh Lampu Taman
0.6500 Oh Pembantu Tukang
0.65000 Oh Tukang Listrik
0.048 Oh Kepala Tukang
0.004 Oh Mandor

P.7 Pekerjaan Kabel NYY 2x4 m'


1.0000 m Kabel NYY 2x4
0.0540 Oh Pembantu Tukang
0.0900 Oh Tukang Listrik
0.0090 Oh Kepala Tukang
0.0270 Oh Mandor

P.8 Pekerjaan Kabel NYY 3x4 m'


1.0000 m Kabel NYM 3x4
0.0540 Oh Pembantu Tukang
0.0900 Oh Tukang Listrik
0.0090 Oh Kepala Tukang
0.0270 Oh Mandor
HARGA SATUAN (Rp.)
JUMLAH (Rp.)
BAHAN UPAH
3 4 5

6,500.00 71,500.00
125,000.00 125,000.00
67,000.00 32,160.00
70,000.00 33,600.00
80,000.00 3,840.00
85,000.00 340.00
266,440.00

26,500.00 26,500.00
67,000.00 13,400.00
70,000.00 14,000.00
80,000.00 1,600.00
85,000.00 170.00
55,670.00

198,000.00 198,000.00
67,000.00 13,400.00
70,000.00 14,000.00
80,000.00 1,600.00
85,000.00 170.00
227,170.00

61,500.00 61,500.00
67,000.00 13,400.00
70,000.00 14,000.00
80,000.00 1,600.00
85,000.00 170.00
90,670.00

29,000.00 29,000.00
67,000.00 13,400.00
70,000.00 14,000.00
80,000.00 1,600.00
85,000.00 170.00
58,170.00
338,500.00 338,500.00
67,000.00 43,550.00
70,000.00 45,500.00
80,000.00 3,840.00
85,000.00 340.00
431,730.00

13,000.00 13,000.00
67,000.00 3,618.00
70,000.00 6,300.00
70,000.00 630.00
70,000.00 1,890.00
25,438.00

21,500.00 21,500.00
67,000.00 3,618.00
70,000.00 6,300.00
80,000.00 720.00
85,000.00 2,295.00
34,433.00
DAFTAR REKAPITULASI ANALISA BIAYA KONSTRUKSI PERUMAHAN 2 LANTAI 400M2, LAHAN 12
BOGOR
TAHUN ANGGARAN 2015

KODE
URAIAN PEKERJAAN
ANALISA
1 2
A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

A.1 1 m' Pagar sementara dari kayu tinggi 2 m


A.2 1 m² Membersihkan lapangan dan peralatan
A.3 1 m² Pembuatan bak adukan ukuran 40 cm x 50 cm x 20 cm
A.4 1 m² Pembuatan bedeng buruh
A.5 1 m² Pembuatan stegger
A.6 1m' Pengukuran dan pemasangan bouwplank, papan 2/20

B. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP TANAH

B.1 1 m³ Galian Tanah biasa Sedalam 1 m (dengan tenaga)


B.2 1 m³ Galian Tanah biasa Sedalam 2 m (dengan tenaga)
B.3 1 m³ Pemadatan Tanah (dengan tenaga)
B.4 1 m³ Urugan Pasir (dengan tenaga)
B.5 1 m³ Urugan Sirtu (dengan tenaga)

C. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

C.1 1 m³ Pasang Pondasi Batu Belah 1 PC : 4 Ps


C.2 1 m³ Pasang Pondasi Batu Kali. 1 PC : 5 Ps
C.3 Beton 1:2:3/m3 dengan Koral
C.4 1 m³ Ready Mix K-225

D. ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING

D.1 1 m² Pasang Dinding Bataco Uk. 20 cm x 40 cm, 1 PC : 4 Ps


D.2 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 2 Ps
D.3 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 2 Ps
D.4 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 4 Ps
D.5 1 m² Pasang dinding conblock (C.B. 10)
D.6 1 m² Pasang dinding roster uk. 20 cm x 20 cm

E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

E.1 1 m² Plesteran 1 PC : 4 Ps, tebal 15 mm


E.2 1 m² Plesteran 1 PC : 2 Ps, tebal 20 mm
E.3 1 m² Plesteran beton 1 PC : 2 Ps, tebal 15 mm
E.4 1 m² Plesteran siar, 1 PC : 2 Ps
E.5 1 m² Plesteran waterproof batacote, 3 lapis

F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

F.1 1 m³ Pasang kusen pintu / jendela, kayu kelas II


F.2 1 m³ Pasang balok profil, kayu kelas III (non SNI)
F.3 1 m² Pasang daun pintu / jendela panel, kayu kelas II
F.4 1 m³ Pasang konstruksi kuda-kuda, kayu kelas II
F.5 1 m³ Pasang gording kuda-kuda, kayu kelas II (non SNI)
F.6 1 m² Pasang kaso + reng untuk genteng, kayu kelas II
F.7 1 m² Pasang rangka langit-langit uk. 1 m x 1 m, kayu kelas II
F.8 1 m² Pasang rangka langit-langit uk. 30 cm x 60 cm, kayu kelas II
F.9 1 m² Pasang rangka langit-langit uk. 30 cm x 30 cm, kayu kelas II
F.10 1 m² Pasang lisplank uk. 3 cm x 20 cm, kayu kelas II
F.11 1 m² Pasang lisplank uk. 3 cm x 30 cm, kayu kelas II
F.12 1 m² Pasang dinding plywood,
F.13 1 m' Pasang list plafond, dengan kayu profil 3 cm x 3 cm, kayu kelas II

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

G.1 1 m³ Membuat beton tumbuk, 1 PC : 2 Ps : 3 krk


G.2 1 m³ Membuat beton tumbuk, 1 PC : 3 Ps : 5 krk
G.3 1 m³ Membuat beton bertulang, 1 PC : 2 Ps : 4 krk
G.4 1 m³ Membuat beton bertulang, 1 PC : 1,5 Ps : 3 split
G.5 1 kg Pembesian dengan besi polos/ulir
G.6 Pembongkaran Bekisting 1 m³ beton
G.7 1 m² Pasang bekisting untuk pondasi
G.8 1 m² Pasang bekisting untuk sloof
G.9 1 m² Pasang bekisting untuk kolom
G.10 1 m² Pasang bekisting untuk balok
G.11 1 m² Pasang bekisting untuk lantai
G.12 1 m³ Membuat beton mutu K. 225
G.13 1 kg Pembesian dengan besi polos/ulir
G.14 1 m³ Membuat pondasi beton bertulang (150 kg besi + bekisting)
G.15 1 m³ Membuat sloof beton bertulang (200 kg besi + bekisting)
G.16 1 m³ Membuat kolom beton bertulang (150 kg besi + bekisting)
G.17 1 m' Membuat kolom penguat beton bertulang uk. 11 cm x 11 cm
G.18 1 m' Membuat ringbalk beton bertulang uk. 10 cm x 15 cm

H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

H.1 1 m² Pasang atap genteng kodok / glazzur


H.2 1 m² Pasang roof light fibreglass uk. 180 cm x 90 cm
H.3 1 m² Pasang atap alumunium super sheet
H.4 1 m' Pasang atap nok genteng kodok
H.5 1 m' Pasang atap nok alumunium
H.6 1 m² Pasang Aluminium Foil
H.7 1 m² Pasang atap metal batuan /tekstur

I. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT

I.1 1 m² Langit-langit asbes 1 m x 1 m, tebal 5 mm


I.2 1 m² Langit-langit akustik uk. 30 cm x 60 cm + rangka alumunium
I.3 1 m² Langit-langit akustik uk. 60 cm x 120 cm + rangka alumunium
I.4 1 m² Langit-langit gypsum board, tebal 9 mm
I.5 1 m² Langit-langit plywood tebal 4 mm + rangka kayu kelas III
I.6 1 m² Kompon Gypsum (nonSNI)
I.7 1 m² Amplas Gypsum (non SNI)
I.8 1 m' List langit-langit kayu profil

J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI

J.1 Memasang 1 buah klosed duduk / monoblock


J.2 Memasang 1 buah wastafel
J.3 Memasang 1 buah bak beton vol. 1 m³ air dengan porselin 11 cm x 11 cm
J.4 Memasang 1 m' pipa beton ø 15 cm - 20 cm
J.5 Memasang 1 m' pipa galvanis ø 1/2"
J.6 Memasang 1 m' pipa galvanis ø 1"
J.7 Memasang 1 m' pipa galvanis ø 2"
J.8 Memasang 1 m' pipa PVC tipe AW ø 1/2"
J.9 Memasang 1 m' pipa PVC tipe AW ø 3/4"
J.10 Memasang 1 m' pipa PVC tipe AW ø 1"
J.11 Memasang 1 bh kran air ø 3/4" atau 1/2"

K. ANALISA BIAYA PEKERJAAN CAT DAN TALANG

K.1 1 m² Mengecat tembok baru (1 lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup)
K.2 1 m² Mengecat bidang kayu baru (1lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup)
K.3 1 m² Mengecat Genteng
K.5 1 m² Mengeter rangka kayu
K.6 1 m² Mengapur dinding baru
K.7 1 m² Memeni besi 2X
K.8 1 m' Pasang talang datar, seng BJLS 27
K.9 1 m' Pasang talang miring, seng BJLS 27
K.10 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng BJLS 27

L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK


L.1 1 m² Pasangan lantai keramik 30 cm x 30 cm
L.2 1 m² Pasangan lantai keramik 40 cm x 40 cm
L.3 1 m² Pasangan lantai ubin granito 40 cm x 40 cm
L.4 1 m' Pasangan plint ubin granito 10 cm x 40 cm
L.5 1 m' Pasangan plint keramik 10 cm x 15 cm
L.6 1 m² Pasangan dinding batu tempel hitam
L.7 1 m² Pasangan plint kayu 10 x 20 cm
L.8 1 m² Pasangan lantai dari conblock, tebal 6 cm

M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA

M.1 1 kg Pasang rangka atap baja


M.2 1 m² Pasang rolling door
M.3 1 m² Pasang kusen pintu / jendela alumunium biasa
M.4 1 m² Pasang pintu alumunium biasa
M.5 1 m² Pasang vertical blinds
M.6 1 m² Pasang teralis besi
M.7 1 m² Pasang kawat kassa, dengan rangka kayu kelas III
M.8 1 m² Pasang kaca bening tebal 8 mm
M.9 1 m² Pasang kaca buram, tebal 12 mm

N. ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI, ENGSEL DAN KAIT

N.1 1 Buah pasang kunci tanam antik


N.2 1 Buah pasang kunci tanam
N.3 1 Buah pasang kunci tanam kamar mandi
N.4 1 Buah pasang engsel pintu/jendela 4"
N.5 1 Buah pasang kunci slot
N.6 1 Buah pasang rel pintu dorong
N.7 1 Buah pasang kunci lemari

O. ANALISA PEKERJAAN KUSEN PINTU & JENDELA ALUMINIUM


O.1 Memasang 1 Unit Pintu Type PD1(Pintu Utama)
O.2 Memasang 1 Unit Pintu type PD2
O.3 Memasang 1 Unit Pintu Kamar
O.4 Memasang 1 Unit Pintu type PVC
O.5 Memasang 1 Unit Pintu type Kantor

P. ANALISA PEKERJAAN ELEKTRIKAL


P.1 Instalasi Lampu dan Kontak pertitik
P.2 Pekerjaan Stop Kontak per buah
P.3 Pekerjaan Lampu 18 Watt per buah
P.4 Pekerjaan MCB BOX per buah
P.5 Pekerjaan Saklar Gandaper buah
P.6 Pekerjaan Lampu Taman per buah
P.7 Pekerjaan Kabel NYY 2x4m
P.8 Pekerjaan Kabel NYY 3x4m
UKSI PERUMAHAN 2 LANTAI 400M2, LAHAN 1200M2
GOR
GARAN 2015

JUMLAH (Rp.) KETERANGAN

3 4

172,526.90 Harga satuan


7,425.00 tidak termasuk PPN
180,494.50
793,870.20
63,239.30
78,433.25

23,340.86
30,635.94
39,250.00
233,071.72
267,824.04

775,830.80
733,751.41
424,218.40
1,353,625.00

103,024.80
266,801.20
128,442.34
118,104.77
186,831.95
457,335.65

38,785.80
62,801.42 Harga satuan
50,081.99 tidak termasuk PPN
260,403.37
26,705.04

4,963,000.00
3,032,719.97
4,653,720.00
3,600,720.00
70,265.00
70,225.00
70,225.00
102,625.00
121,827.50
43,121.00
58,325.00
66,835.50
15,347.00

801,725.60
811,101.60
1,096,881.00
1,119,770.40
25,438.00
152,445.00 Harga satuan
167,195.00 tidak termasuk PPN
964,715.15
4,005,649.40
3,084,027.75
3,928,844.50
1,339,580.00
25,438.00
5,394,965.60
6,928,395.60
8,514,304.40
87,973.18
99,583.15

104,120.00
87,614.48
82,425.00
128,190.00
226,470.00
36,640.00
33,190.00

45,885.39
97,563.91
352,243.56
30,477.07
160,157.19
28,932.73
13,977.33
18,568.81

2,701,939.00
465,107.58
11,617,812.19
205,361.46 Harga satuan
66,102.69 tidak termasuk PPN
119,562.69
239,668.26
18,869.42
22,595.42
27,779.42
49,469.82

17,804.00
33,484.50
62,029.90
10,352.13
14,020.50
21,305.00
114,342.24
84,277.25
75,726.00
183,853.58
218,653.58
443,672.80
18,078.00
51,595.95
699,918.65
26,280.00
39,300.00

36,433.50
598,550.00
764,350.00 Harga satuan
2,508,550.00 tidak termasuk PPN
504,610.00
58,508.00
56,000.00
235,625.50
499,625.00

205,980.99
173,851.40
104,032.89
34,295.25
34,560.33
276,580.99
63,925.41

14,629,744.68
3,684,693.20
3,630,780.00
483,200.00
2,750,733.90

266,440.00
55,670.00
227,170.00
90,670.00 Harga satuan
58,170.00 tidak termasuk PPN
431,730.00
25,438.00
34,433.00
RINCIAN ANGGARAN BIAYA KONSTRUKSI PERUMAHAN 2 LANTAI 207M2
PURWOKERTO
TAHUN ANGGARAN 2022

KODE
URAIAN PEKERJAAN Volume Sat
ANALISA
1
A. PEKERJAAN PERSIAPAN

A.1 Pagar sementara dari kayu tinggi 2 m 30 m'


A.2 Membersihkan lapangan dan peralatan 1200 m2
A.3 Pembuatan bak adukan ukuran 40 cm x 50 cm x 20 cm 0.16 m2
A.4 Pembuatan bedeng buruh 49 m2
A.5 Pembuatan stegger 40 m2
A.6 Pengukuran dan pemasangan bouwplank, papan 2/20 177.4 m'

B. PEKERJAAN PENUTUP TANAH

B.1 Galian Tanah biasa Sedalam 1 m (dengan tenaga) 48.7 m3


B.2 Galian Tanah biasa Sedalam 2 m (dengan tenaga) 80 m3
B.3 Pemadatan Tanah (dengan tenaga) 80 m3
B.4 Urugan Pasir (dengan tenaga) 50 m3
B.5 Urugan Sirtu (dengan tenaga) 20 m3

C. PEKERJAAN PONDASI

C.1 Pasang Pondasi Batu Belah 1 PC : 4 Ps 24 m3


C.2 Pasang Pondasi Batu Kali. 1 PC : 5 Ps 24 m3
C.3 Beton 1:2:3 dengan Koral 5 m3
C.4 Ready Mix K-225 - m3

D. PEKERJAAN PASANGAN DINDING

D.1 Pasang Dinding Bataco Uk. 20 cm x 40 cm, 1 PC : 4 Ps 250 m2


D.2 Pasang Dinding Bata merah tebal 1 bata, 1 PC : 2 Ps 150 m2
D.3 Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 2 Ps 12 m2
D.4 Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 4 Ps 12 m2
D.5 Pasang dinding conblock (C.B. 10) 40 m2
D.6 Pasang dinding roster uk. 20 cm x 20 cm 0.84 m2

E. PEKERJAAN PLESTERAN

E.1 Plesteran 1 PC : 4 Ps, tebal 15 mm 320 m2


E.2 Plesteran 1 PC : 2 Ps, tebal 20 mm 280 m2
E.3 Plesteran beton 1 PC : 2 Ps, tebal 15 mm 270 m2
E.4 Plesteran siar, 1 PC : 2 Ps 100 m2
E.5 Plesteran waterproof batacote, 3 lapis 320 m2

F. PEKERJAAN KAYU

F.1 Pasang kusen pintu / jendela, kayu kelas II m3


F.2 Pasang balok profil, kayu kelas III (non SNI) m3
F.3 Pasang daun pintu / jendela panel, kayu kelas II m3
F.4 Pasang konstruksi kuda-kuda, kayu kelas II m3
F.5 Pasang gording kuda-kuda, kayu kelas II (non SNI) m3
F.6 Pasang kaso + reng untuk genteng, kayu kelas II m2
F.7 Pasang rangka langit-langit uk. 1 m x 1 m, kayu kelas II m2
F.8 Pasang rangka langit-langit uk. 30 cm x 60 cm, kayu kelas II m2
F.9 Pasang rangka langit-langit uk. 30 cm x 30 cm, kayu kelas II m2
F.10 Pasang lisplank uk. 3 cm x 20 cm, kayu kelas II m2
F.11 Pasang lisplank uk. 3 cm x 30 cm, kayu kelas II m2
F.12 Pasang dinding plywood, m2
F.13 Pasang list plafond, dengan kayu profil 3 cm x 3 cm, kayu kelas II m'

G. PEKERJAAN BETON

G.1 Membuat beton tumbuk, 1 PC : 2 Ps : 3 krk m3


G.2 Membuat beton tumbuk, 1 PC : 3 Ps : 5 krk m3
G.3 Membuat beton bertulang, 1 PC : 2 Ps : 4 krk m3
G.4 Membuat beton bertulang, 1 PC : 1,5 Ps : 3 split m3
G.5 Pembesian dengan besi polos/ulir kg
G.6 Pembongkaran Bekisting beton m3
G.7 Pasang bekisting untuk pondasi m2
G.8 Pasang bekisting untuk sloof m2
G.9 Pasang bekisting untuk kolom m2
G.10 Pasang bekisting untuk balok m2
G.11 Pasang bekisting untuk lantai m2
G.12 Membuat beton mutu K. 225 m2
G.13 Pembesian dengan besi polos/ulir kg
G.14 Membuat pondasi beton bertulang (150 kg besi + bekisting) m3
G.15 Membuat sloof beton bertulang (200 kg besi + bekisting) m3
G.16 Membuat kolom beton bertulang (150 kg besi + bekisting) m3
G.17 Membuat kolom penguat beton bertulang uk. 11 cm x 11 cm m'
G.18 Membuat ringbalk beton bertulang uk. 10 cm x 15 cm m'

H. PEKERJAAN PENUTUP ATAP

H.1 Pasang atap genteng kodok / glazzur m2


H.2 Pasang roof light fibreglass uk. 180 cm x 90 cm m2
H.3 Pasang atap alumunium super sheet m2
H.4 Pasang atap nok genteng kodok m'
H.5 Pasang atap nok alumunium m'
H.6 Pasang Aluminium Foil m2
H.7 Pasang atap metal batuan /tekstur m2

I. PEKERJAAN LANGIT - LANGIT

I.1 Langit-langit asbes 1 m x 1 m, tebal 5 mm


I.2 Langit-langit akustik uk. 30 cm x 60 cm + rangka alumunium m2
I.3 Langit-langit akustik uk. 60 cm x 120 cm + rangka alumunium m2
I.4 Langit-langit gypsum board, tebal 9 mm m2
I.5 Langit-langit plywood tebal 4 mm + rangka kayu kelas III m2
I.6 Kompon Gypsum (nonSNI) m2
I.7 Amplas Gypsum (non SNI) m2
I.8 List langit-langit kayu profil m'

J. PEKERJAAN PIPA DAN SANITASI

J.1 klosed duduk / monoblock 4 bh


J.2 Wastafel 5 bh
J.3 Bak beton air dengan porselin 11 cm x 11 cm 5 m3
J.4 Pipa beton ø 15 cm - 20 cm 12 bh
J.5 Pipa galvanis ø 1/2" 10 m'
J.6 Pipa galvanis ø 1" 15 m'
J.7 Pipa galvanis ø 2" 20 m'
J.8 Pipa PVC tipe AW ø 1/2" 14 m'
J.9 Pipa PVC tipe AW ø 3/4" 16 m'
J.10 Pipa PVC tipe AW ø 1" 37 m'
J.11 Kran air ø 3/4" atau 1/2" bh

K. PEKERJAAN CAT DAN TALANG

K.1 Mengecat tembok baru (1 lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup) m2
K.2 Mengecat bidang kayu baru (1lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup) m2
K.3 Mengecat Genteng m2
K.5 Mengeter rangka kayu m2
K.6 Mengapur dinding baru m2
K.7 Memeni besi 2X m2
K.8 Pasang talang datar, seng BJLS 27 m2
K.9 Pasang talang miring, seng BJLS 27 m'
K.10 Pasang talang 1/2 lingkaran ø 10 cm, seng BJLS 27 m'

L. PEKERJAAN LANTAI DAN KERAMIK


L.1 Pasangan lantai keramik 30 cm x 30 cm m2
L.2 Pasangan lantai keramik 40 cm x 40 cm m2
L.3 Pasangan lantai ubin granito 40 cm x 40 cm m2
L.4 Pasangan plint ubin granito 10 cm x 40 cm m'
L.5 Pasangan plint keramik 10 cm x 15 cm m'
L.6 Pasangan dinding batu tempel hitam m2
L.7 Pasangan plint kayu 10 x 20 cm m2
L.8 Pasangan lantai dari conblock, tebal 6 cm m2

M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA

M.1 Pasang rangka atap baja kg


M.2 Pasang rolling door m2
M.3 Pasang kusen pintu / jendela alumunium biasa m2
M.4 Pasang pintu alumunium biasa m2
M.5 Pasang vertical blinds m2
M.6 Pasang teralis besi m2
M.7 Pasang kawat kassa, dengan rangka kayu kelas III m2
M.8 Pasang kaca bening tebal 8 mm m2
M.9 Pasang kaca buram, tebal 12 mm m2

N. ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI, ENGSEL DAN KAIT

N.1 Pasang kunci tanam antik bh


N.2 Pasang kunci tanam bh
N.3 Pasang kunci tanam kamar mandi bh
N.4 Pasang engsel pintu/jendela 4" bh
N.5 Pasang kunci slot bh
N.6 Pasang rel pintu dorong bh
N.7 Pasang kunci lemari bh

O. ANALISA PEKERJAAN KUSEN PINTU & JENDELA ALUMINIUM


O.1 Pintu Type PD1(Pintu Utama) Unit
O.2 Pintu type PD2 Unit
O.3 Pintu Kamar Unit
O.4 Pintu type PVC Unit
O.5 Pintu type Kantor Unit

P. ANALISA PEKERJAAN ELEKTRIKAL


P.1 Instalasi Lampu dan Kontak Titik
P.2 Pekerjaan Stop Kontak bh
P.3 Pekerjaan Lampu 18 Watt bh
P.4 Pekerjaan MCB BOX bh
P.5 Pekerjaan Saklar Ganda bh
P.6 Pekerjaan Lampu Taman bh
P.7 Pekerjaan Kabel NYY 2x4m m'
P.8 Pekerjaan Kabel NYY 3x4m m'
HAN 2 LANTAI 207M2

Harga Satuan (Rp.) Total

172,526.90 5,175,807.00
7,425.00 8,910,000.00
180,494.50 28,879.12
793,870.20 38,899,639.80
63,239.30 2,529,572.13
78,433.25 13,914,059.08
69,457,957.13

23,340.86 1,136,699.96
30,635.94 2,450,874.82
39,250.00 3,140,000.00
233,071.72 11,653,586.07
267,824.04 5,356,480.77
23,737,641.62

775,830.80 18,619,939.20
733,751.41 17,610,033.84
424,218.40 2,121,092.00
1,353,625.00
38,351,065.04

103,024.80 25,756,199.23
266,801.20 40,020,180.00
128,442.34 1,541,308.04
118,104.77 1,417,257.24
186,831.95 7,473,278.00
457,335.65 384,161.95
76,592,384.45

38,785.80 12,411,456.00
62,801.42 17,584,397.60
50,081.99 13,522,137.30
260,403.37 26,040,337.26
26,705.04 8,545,612.80 286,242,989.20
78,103,940.96

4,963,000.00
3,032,719.97
4,653,720.00
3,600,720.00
70,265.00
70,225.00
70,225.00
102,625.00
121,827.50
43,121.00
58,325.00
66,835.50
15,347.00

801,725.60
811,101.60
1,096,881.00
1,119,770.40
25,438.00
152,445.00 Harga satuan
167,195.00 tidak termasuk PPN
964,715.15
4,005,649.40
3,084,027.75
3,928,844.50
1,339,580.00
25,438.00
5,394,965.60
6,928,395.60
8,514,304.40
87,973.18
99,583.15

104,120.00
87,614.48
82,425.00
128,190.00
226,470.00
36,640.00
33,190.00

45,885.39
97,563.91
352,243.56
30,477.07
160,157.19
28,932.73
13,977.33
18,568.81

2,701,939.00 10,807,756.00
465,107.58 2,325,537.90
11,617,812.19 58,089,060.95
205,361.46 793,232.25
66,102.69 661,026.87
119,562.69 1,793,440.31
239,668.26 4,793,365.15
18,869.42 264,171.87
22,595.42 361,526.71
27,779.42 1,027,838.51
49,469.82

17,804.00
33,484.50
62,029.90
10,352.13
14,020.50
21,305.00
114,342.24
84,277.25
75,726.00
183,853.58
218,653.58
443,672.80
18,078.00
51,595.95
699,918.65
26,280.00
39,300.00

36,433.50
598,550.00
764,350.00
2,508,550.00
504,610.00
58,508.00
56,000.00
235,625.50
499,625.00

205,980.99
173,851.40
104,032.89
34,295.25
34,560.33
276,580.99
63,925.41

14,629,744.68
3,684,693.20
3,630,780.00
483,200.00
2,750,733.90

266,440.00
55,670.00
227,170.00
90,670.00 Harga satuan
58,170.00 tidak termasuk PPN
431,730.00
25,438.00
34,433.00

Anda mungkin juga menyukai