DAFTAR HARGA UPAH KERJA

KABUPATEN YAHUKIMO

NO. TENAGA KERJA SATUAN HARGA SATUAN (Rp.) KETERANGAN

1 Pekerja 1 OH 65,000.00
2 Tukang 1 OH 85,000.00
3 Kepala Tukang 1 OH 100,000.00
4 Mandor 1 OH 120,000.00
5 Sopir Terampil 1 OH 120,000.00
6 Pembantu sopir 1 OH 75,000.00
7 Operator terampil 1 OH 150,000.00
8 Pembantu operator 1 OH 75,000.00

DAFTAR HARGA BAHAN/MATERIAL


KABUPATEN YAHUKIMO

NO. JENIS MATERIAL SATUAN HARGA SATUAN (Rp.) KETERANGAN

A MATERIAL LOKAL
GALIAN C/BATU CETAK
1 Kerikil Kasar M3 140,000.00
2 Kerikil Halus Beton M3 140,000.00
3 Batu Kali M3 85,600.00
4 Batu pecah 3 - 5 cm M3 91,000.00
5 Batu pecah 2 - 3 cm M3 95,700.00
6 Batu pecah 1 - 2 cm M3 102,000.00
7 Pasir urug / timbun M3 54,600.00
8 Pasir ayak untuk beton M3 77,000.00
9 Sirtu (tak diayak) M3 58,600.00
10 Bahan timbunan pilihan M3 50,000.00
11 Tanah urug / timbun M3 20,000.00
12 Batu tela Bh 1,650.00
13 Conblok / batu krawang Bh 6,820.00
14 Paving block Bh 1,760.00

KAYU
1 Kayu balok / papan besi 10x10 M3 2,043,000.00
2 Kayu balok / papan besi 5x10 M 3
2,043,000.00
3 Kayu balok / papan besi 5x5 M3 2,043,000.00
4 Kayu bakar M3 880,000.00
5 Kayu perancah M3 1,375,000.00
6 Tiang kayu bulat Ø 10 cm M3 2,420,000.00
7 Tiang kayu bulat Ø 20 cm / dolken Btg 44,000.00
8 Balok tumpuan Ø 40 cm M3 2,420,000.00
9 Kayu balok Ø 40 cm M3 2,420,000.00

B. MATERIAL TOKO
MATERIAL PENGIKAT
1 Semen / PC @ 50 kg Zak 300,000.00
BESI BETON KAWAT & PAKU
1 Besi beton Ø 6 mm Kg 15,936.59
2 Besi beton Ø 8 mm Kg 11,565.96
3 Besi beton Ø 10 mm Kg 9,637.72
4 Besi beton Ø 12 mm Kg 7,752.22
5 Besi beton Ø 16 mm Kg 7,569.69
6 Besi beton Ø 19 mm Kg 5,987.89
7 Besi beton Ø 20 mm Kg 5,803.25
8 Kawat ikat beton Kg 7,500.00
9 Kawat bronjong Ø3 mm Kg 12,000.00
10 Kawat duri / pagar M 65,700.00
11 Paku reng Kg 12,300.00
12 Paku skrup Kg 12,300.00
13 Baut + Mur 15 Bh 2,400.00
14 Bronjong pabrikasi (2.0x1.0x0.5) Ø3 mm Lbr 250,000.00

DAFTAR HARGA ALAT BANTU


KABUPATEN YAHUKIMO

NO. JENIS MATERIAL SATUAN HARGA SATUAN (Rp.) KETERANGAN

C. ALAT BANTU
1 Keranjang buah Rp 367,000.00
2 Kereta dorong unit Rp 235,000.00
3 Jack hammer unit Rp 11,759,000.00
4 Pemadat timbunan (vibro roller/stamper) unit Rp 376,000.00
5 Timbris unit Rp 300,000.00
6 Tang pemotong kawat buah Rp 30,000.00
7 Palu pecah batu buah Rp 17,000.00
8 Molen unit Rp 89,664,000.00
9 Vibrator unit Rp 4,189,000.00
10 Kotak adukan buah Rp 37,000.00
11 Ember besar buah Rp 32,000.00
12 Gergaji buah Rp 36,000.00
13 Gunting pemotong baja/seng buah Rp 44,000.00
14 Tusuk bambu buah Rp 30,000.00
15 Cetok buah Rp 345,000.00
16 Linggis buah Rp 71,000.00
Analisis Harga Penggunaan Alat Konstruksi Per Jam

Perincian Harga Operasi per Jam Harga Total per Jam

Flywheel Usia
No. Model, Kapasitas, Berat Operasi Harga beli Nilai Susut Nilai Sisa (10%)
Power Guna Porsi Nilai Porsi Nilai
atau Diameter Bunga, Pajak & Biaya Penyu Biaya Bahan Gaji Harga total
Nilai Depre siasi Spare Part Bahan Bakar Luar Dalam
Asuransi sutan Perbaikan Pelumas Pegawai
(10) - (13) (14) - (16)
(HP) (Tahun) (Jam) US$ (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (!4) (15) (16) (17) (18) (19) (20) (21)

1 Agitator Truck, 3.2 m3 3.2 m3 110 7 2,000 28,505 311,274,600 9,338,238 30,193,636 19,410.19 8,893.56 4,669 9,058 6,039 171,600 92,400 28,125 42,031 298,164 340,195
2 Buldozer, 15 ton 15 ton 145 7 2,000 140,000 1,528,800,000 152,880,000 98,280.00 43,680.00 45,864 30,576 226,200 121,579 28,125 187,824 180,280 368,104
3 Buldozer, 21 ton 21 ton 200 5 2,000 155,000 1,692,600,000 169,260,000 152,334.00 50,778.00 50,778 33,852 312,000 168,000 28,125 253,890 229,977 483,867
4 Vibrator Roller, 10 ton 10 ton 118 4 2,000 69,360 757,424,707 22,722,741 73,470,197 82,653.97 23,669.52 11,361 22,041 14,694 183,300 98,700 28,125 139,726 141,519 281,245
5 Motor Grader, 3.1 m 3.1 m 115 7 2,000 112,865 1,232,487,384 36,974,622 119,551,276 76,854.39 35,213.93 18,487 35,865 23,910 179,400 96,600 28,125 166,421 148,635 315,056
6 Wheel Loader, 1.5 m 3
1.5 m 3
110 5 2,000 93,000 1,015,560,000 30,466,800 98,509,320 88,658.39 30,466.80 15,233 29,553 19,702 171,600 92,400 28,125 163,911 140,227 304,138
7 Crane Truck Hydraulic, 20 ton 20 ton 230 8 2,000 57,283 625,527,393 18,765,822 60,676,157 34,130.34 17,592.96 18,203 12,135 358,800 193,200 28,125 69,926 233,460 303,386
8 Concrete Vibrator, 45 mm 45 mm 5 3 2,000 2,940 32,109,641 3,210,964 4,816.45 1,070.32 963 642 7,800 4,200 28,125 6,850 32,967 39,817
9 Concrete Mixer, 150 liter 150 liter 5 5 2,000 2,520 27,520,820 2,752,082 2,476.87 825.62 826 550 7,800 4,200 28,125 4,128 32,875 37,004
10 Asphalt Sprayer, 200 liter 200 liter 35 5 2,000 14,203 155,100,000 15,510,000 13,959.00 4,653.00 4,653 3,102 54,600 29,400 28,125 23,265 60,627 83,892
11 Asphalt Finisher 2,4-3,6 m wide 75 7 2,000 168,546 1,840,520,000 55,215,600 178,530,440 114,769.57 52,586.29 27,608 53,559 35,706 117,000 63,000 28,125 248,523 126,831 375,354
12 ARC Welder 250 A - 7 kw 0 5 2,000 3,314 36,190,000 3,619,000 3,257.10 1,085.70 1,086 724 0 0 28,125 5,429 28,849 34,277
13 Excavator/Backhoe, 0,7 m3 0.7 m3 135 7 2,000 80,519 879,264,775 87,926,478 56,524.16 25,121.85 26,378 17,585 210,600 113,400 28,125 108,024 159,110 267,134
14 Diesel Generator, 100 kVA 100 kVA 133 5 2,000 42,136 460,130,000 46,013,000 41,411.70 13,803.90 13,804 9,203 207,480 111,720 18,750 69,020 139,673 208,692
15 Road Roller, 10 ton 10 ton 11 5 2,000 5,701 62,250,892 1,867,527 6,038,336 5,434.50 1,867.53 934 1,812 1,208 17,160 9,240 28,125 10,047 38,573 48,620
16 Tamping Roller 6 ton - 12 ton 11 5 2,000 47,344 517,000,000 51,700,000 46,530.00 15,510.00 15,510 10,340 17,160 9,240 28,125 77,550 47,705 125,255
17 Water tank truck, 5000 liter 5000 liter 180 5 2,000 23,385 255,369,534 7,661,086 24,770,845 22,293.76 7,661.09 3,831 7,431 4,954 280,800 151,200 28,125 41,217 184,279 225,496
18 Hand Tamper, 59 kg 59 kg 3 3 2,000 1,412 15,424,325 1,542,433 2,313.65 514.14 463 308 4,680 2,520 28,125 3,291 30,953 34,244
19 Jack Hammer 25 kg 0 3 2,000 3,367 36,762,460 3,676,246 5,514.37 1,225.42 1,103 735 0 0 28,125 7,843 28,860 36,703
20 Three Wheel Roller, 10 ton 10 ton 66 7 2,000 50,757 554,264,779 55,426,478 35,631.31 15,836.14 16,628 11,085 102,960 55,440 28,125 68,095 94,650 162,746
21 Truck Flat Bed, 4 ton 4 ton 180 5 2,000 20,717 226,230,522 6,786,916 21,944,361 19,749.92 6786.92 3,393 6,583.31 4,389 280,800 151,200 28,125 36,513.61 183,714 220,227
22 Mesin pembengkok besi 7 kw 0 3 2,000 8,416 91,906,150 9,190,615 13,785.92 3063.54 2,757.18 1,838 ` 0 28,125 19,606.65 29,963 49,570
23 Mesin pemotong besi 7 kw 0 3 2,000 7,303 79,746,259 7,974,626 11,961.94 2658.21 2,392.39 1,595 0 0 28,125 17,012.54 29,720 46,732
24 Dump Truck, 10 ton 10 ton 190 8 2,000 24,000 262,080,000 7,862,400 25,421,760 14,299.74 7,371.00 3,931 7,627 5,084 296,400 192,945 28,125 33,228 226,154 259,382
25 Excavator/Backhoe, 1.2 m3 1.2 m3 205 7 2,000 99,725 1,089,000,000 108,900,000 70,007.14 31,114.29 32,670 21,780 319,800 172,200 28,125 133,791 222,105 355,896
26 Grout Pump 280 kg 0 5 2,000 9,275 101,284,433 10,128,443 9,115.60 3,038.53 3,039 2,026 0 0 28,125 15,193 30,151 45,343
27 Excavator/Tracktor Shovel, 1.2 m3 1.2 m3 135 7 2,000 132,564 1,447,600,000 144,760,000 93,060.00 41,360.00 43,428 28,952 210,600 113,400 28,125 177,848 170,477 348,325
28 Air compressor, 60 CFM 60 CFM 25 8 2,000 20,579 224,720,257 6,741,608 21,797,865 12,261.30 6,320.26 6,539 4,360 39,000 21,000 28,125 25,121 53,485 78,605
29 Concrete Pump Truck, 30 m3/jam 30 m3/jam 105 7 2,000 41,952 458,116,807 13,743,504 44,437,330 28,566.86 13,089.05 6,872 13,331 8,887 163,800 88,200 28,125 61,859 125,212 187,071
30 Batching Plant, 20 m3/jam 20 m3/jam 110 8 2,000 73,119 798,460,665 79,846,067 44,913.41 22,456.71 23,954 15,969 171,600 92,400 28,125 91,324 136,494 227,818
31 Pneumatic Tire Roller 8.5 - 20 ton 88 7 2,000 106,051 1,158,080,000 34,742,400 112,333,760 72,214.56 33,088.00 17,371 33,700 22,467 137,280 73,920 28,125 156,374 124,512 280,886
32 Drill Pneumatic Crawler, 5 ton 353 CFM & 65 mm 0 5 2,000 39,155 427,575,686 42,757,569 38,481.81 12,827.27 12,827 8,552 0 0 28,125 64,136 36,677 100,813
33 Air compressor, 250 CFM 250 CFM 65 8 2,000 19,163 209,263,233 6,277,897 20,298,534 11,417.93 5,885.53 6,090 4,060 101,400 54,600 28,125 23,393 86,785 110,178
34 Air compressor, 365 CFM 365 CFM 104 8 2,000 36,145 394,706,654 11,841,200 38,286,545 21,536.18 11,101.12 11,486 7,657 162,240 87,360 28,125 44,123 123,142 167,266
35 Drill, Leg, Air, 22 kg 88 CFM & 86 mm 0 3 2,000 2,237 24,432,896 2,443,290 3,664.93 814.43 733 489 0 0 28,125 5,212 28,614 33,826

Catatan:
1. Data 2006 8. Susut = Harga Susut / Usia Guna
2. Susut = 3% x Harga Beli 9. Harga BBM (Solar) = Rp 13,000 /liter
3. Spare Part = 6% x (Harga Beli - Nilai Susut) / Lama Operasi 10. Harga Pelumas = Rp 28,000 /liter
4. Biaya Perbaikan = 4% x (Harga Beli - Nilai Susut) / Lama Operasi 11. Operator = Rp 150,000 /org-hari
5. Suku Bunga Bank = 10% 12. Ass. Operator = Rp 75,000 /org-hari
6. Bahan bakar = 0.15 x HP x Harga bahan bakar (Solar)
7. Bahan bakar = 0.22 x HP x Harga bahan bakar (Premium)
8. Pelumas, dll = 0.03 x HP x Harga Pelumas
9. Kurs 1US$ = Rp. 10,920 Juli 2011
1JPY = Rp. 132.00 Juli 2011
HARGA
No URAIAN SATUAN
(Rp)

1 Buldoser 110 HP Jam Rp 368,105.40


2 Motor Grader 100 HP Jam Rp 315,056.27
3 Exavator 100 HP Jam Rp 267,134.24
4 Concrete Vibrator Jam Rp 39,817.25
5 Water tank truck 115 HP Jam Rp 225,495.82
6 Dump truck 3,5 T / 115 HP Jam Rp 222,099.48
7 Dump truck 10 T / 190 HP Jam Rp 259,382.35
8 Concrete mixer 125 Ltr / 6 HP Jam Rp 37,003.54
9 Vibrator Roller 10T Jam Rp 281,244.97
10 Helicopter Jam Rp 13,950,000.00
harga umum
Rp 368,104.14
Rp 315,056.27
Rp 267,134.26
Rp 39,817.25
Rp 225,495.81

Rp 259,382.34
Rp 37,003.54
Rp 281,244.96
FAKTOR KONVERSI VOLUME TANAH (Fk)

KONDISI FAKTOR KONVERSI (Fk)


NO. JENIS TANAH
AWAL TANAH ASLI LEPAS

1. Galian

- Tanah Asli 1.00 1.43


(Clay) Lepas 0.70 1.00
Dipadatkan 1.11 1.59

- Batu Lapuk Asli 1.00 1.65


(Broken granite, sandstone Lepas 0.61 1.00
and other soft rock) Dipadatkan 0.82 1.35

- Batu Keras Asli 1.00 1.75


(Broken rocks) Lepas 0.57 1.00
Dipadatkan 0.71 1.24

2. Timbunan

- Tanah (Inti) Asli 1.00 1.43


(Clay) Lepas 0.70 1.00
Dipadatkan 1.11 1.59

- Pasir (Filter) Asli 1.00 1.11


(Sand) Lepas 0.90 1.00
Dipadatkan 1.05 1.17

- Random Asli 1.00 1.70


(Broken granite, basalt Lepas 0.59 1.00
and other hard rock) Dipadatkan 0.76 1.30

- Rip-rap Asli 1.00 1.75


(Broken rocks) Lepas 0.57 1.00
Dipadatkan 0.71 1.24

- Kerikil Asli 1.00 1.13


(Gravel) Lepas 0.88 1.00
Dipadatkan 0.97 1.10
H (Fk)

TOR KONVERSI (Fk)


DIPADATKAN

0.90
0.63
1.00

1.22
0.74
1.00

1.40
0.80
1.00

0.90
0.63
1.00

0.95
0.86
1.00

1.31
0.77
1.00

1.40
0.80
1.00

1.03
0.91
1.00
TABEL III-
PERHITUNGAN KAPASITAS PRODUKSI PERALATAN KONSTRUKSI PER JAM

1. BULLDOZER (DOZING)

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

60 x q x E x Fk
Q 
Ts

dimana Q = kapasitas produksi per jam (m3/jam)


q = kapasitas pisau (m3)
Fk = koefisien konversi volume tanah
E = jumlah trip
DL = jarak dorong (m)
Ts = waktu siklus (menit)
= 0,038 x DL + 0,33

a) Bulldozer, 15 ton

Jenis Pekerjaan q Fk E DL Ts Q

Pengupasan 2.60 1.43 0.83 50.00 2.23 83.03 0.01204387 asli-lepas

b) Bulldozer, 21 ton

Jenis Pekerjaan V Fk E DL Ts Q

Galian Tanah 2.89 1.43 0.83 30.00 1.47 140.01 asli-lepas


Galian Batu Lapuk 2.89 1.65 0.83 30.00 1.47 161.55 asli-lepas
Galian Batu Keras (peledakan) 2.89 1.00 0.83 30.00 1.47 97.91 lepas-lepas
Rip-rap 2.89 0.80 0.83 30.00 1.47 78.32 lepas-padat

2. BULLDOZER (SPREADING)

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

Q
W x V x D x E x Fk 
N

dimana Q = kapasitas per jam ( m3/jam)


W = Lebar efektif spreading (m)
V = Kecepatan kerja (m/jam)
D = Kedalaman Spreading (m)
Fk = koefisien konversi volume tanah
N = Jumlah spreading

a) Bulldozer, 15 ton

Jenis Pekerjaan W V D E Fk N Q

Urugan Kembali 3.20 2000.00 0.30 0.70 0.77 6.00 172.48 0.00579777 lepas-padat

3. EXCAVATOR/BACK HOE

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

V x Fb x Fa x 60
Q
Ts x Fk 
dimana Q = kapasitas per jam (m3/jam)
V = kapasitas bucket (m3)
Fk = koefisien konversi volume tanah
Ts = waktu siklus (menit)
T1 = waktu menggali/memuat (menit)
T2 = waktu lain-lain
Fb = Faktor bucket 0.90
Fa = Faktor effisiensi alat 0.83

a) Back Hoe, 1.2 m3

Jenis Pekerjaan V T1 T2 Ts Fk Q

Pengupasan 1.20 0.30 0.29 0.59 1.00 91.16 asli-lepas


Galian Tanah 1.20 0.34 0.29 0.63 1.65 51.74 0.01932731 asli-lepas
Galian Batu Lapuk 1.20 0.50 0.29 0.79 1.65 41.26 asli-lepas
Galian Batu Keras (peledakan) 1.20 0.30 0.29 0.59 1.00 91.16 lepas-lepas
Galian Batu Keras 1.20 0.50 0.29 0.79 1.00 68.08 lepas-lepas
Timbunan Inti 1.20 0.34 0.29 0.63 0.90 94.86 asli-padat
Timbunan Random 1.20 0.34 0.29 0.63 1.31 65.17 asli-padat
Rip-rap 1.20 0.50 0.29 0.79 1.22 55.80 0.01791983 asli-dipadatkan
b) Back Hoe, 0.7 m3

Jenis Pekerjaan V T1 T2 Ts Fk Q

Rip-rap 0.7 0.34 0.5 0.84 0.80 46.69

4. EXCAVATOR/TRACTOR SHOVEL

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

60 x V2 x E x Fk 
Q
Ts
dimana Q = kapasitas per jam ( m3/jam)
V1 = kapasitas bucket (m3)
Fb = Faktor bucket 0.90
V2 = Volume per siklus (m3)
= V1/Fb
E = faktor managemen kerja 0.75
Ts = Waktu Siklus (menit)
= (36+V2)/60
Fk = koefisien konversi volume tanah

a) Tractor Shovel, 1.2 m3

Jenis Pekerjaan V1 V2 Ts Fk Q

Timbunan Inti 1.20 1.08 0.62 1.43 112.46 asli-padat


Timbunan Filter 1.20 1.08 0.62 0.86 67.63 lepas-padat
Timbunan Random 1.20 1.08 0.62 1.31 103.02 asli-padat
Rip-rap 1.20 1.08 0.62 0.80 62.91 lepas-padat
Urugan Kembali 1.20 1.08 0.62 0.63 49.54 lepas-padat

5. WHEEL LOADER

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

60 x V x E x Fk
Q
Ts

dimanaQ = volume angkut per jam ( m3/jam)


V = Kapasitas bucket (m3)
Fb = Faktor bucket 0.90
Fa = Faktor effisiensi alat 0.83
T1 = Waktu muat (menit)
T2 = waktu lain-lain (menit)
Ts = Waktu siklus (menit)
Fk = Faktor konversi volume tanah

a) Wheel Loader, 1.5 m3

Jenis Pekerjaan V T1 T2 Ts Fk Q

Base-Course 1.5 0.5 0.5 1 1.20 56.03


SubBase-Course 1.5 0.5 0.5 1 1.20 56.03

6. DUMP TRUCK

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

Q
V x Fa 60 
Ts x Fk 
dimanaQ = Volume angkut per jam ( m3/jam)
V = Kapasitas bak (m3)
Fa = Faktor effisiensi alat 0.83
Fk = Koefisien konversi volume tanah
Ts = waktu siklus (menit)
T1 = waktu tempuh isi (menit)
T2 = waktu tempuh kosong (menit)
T3 waktu muat (menit)
T4 = waktu lain-lain (menit)
L = jarak angkut (km)
V1 = Kecepatan rata-rata bermuatan (km/jam) 40
V2 = Kecepatan rata-rata kosong (km/jam) 50

a) Dump Truck, 10 ton

Jenis Pekerjaan V Fk L Qex T1 T2 T3 T4 Ts Q


Rip-rap 6.00 1.22 10.00 55.80 15.00 12.00 6.45 0.40 33.85 7.24

7. VIBRATOR ROLLER

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

Q  A x D x Fk

V x B2 x E
A
N

dimanaQ = kapasitas per jam ( m3/jam)


A = Luasan pemadatan per jam(m2/jam)
B2 = Lebar efektif pemadatan (m)
V = kecepatan kerja alat (m/jam)
E = faktor managemen kerja
N = jumlah pemadatan
D = Kedalaman pemadatan (m)
Fk = koefisien konversi volume tanah

a) Vibrating Roller, 10 ton

Jenis Pekerjaan V B2 E N A D Fk Q

Lapisan Kerikil 2000 1.20 0.83 6.00 332.00 0.30 0.91 90.64 0.01103314 lepas-padat

8. MOTOR GRADER

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

Q
Lh x B x D x Fa x 60 
N x Ts 
dimana Q = volume angkut per jam ( m3/jam)
Lh = Lebar effektif kerja blade (m)
B = lebar efektif blade (m)
Ts = waktu siklus (menit)
T1 = waktu peralatna 1x lintasan (menit)
T2 = waktu lain-lain (menit)
Fa = Faktor effisiensi alat
N = jumlah spreading
D = kedalaman grading (m)

a) Motor Grader, 3.1 m

Jenis Pekerjaan Lh B D Fa N T1 T2 Ts Q

Timbunan Inti 50.00 2.40 0.30 0.83 6.00 0.60 0.50 1.10 271.64
Timbunan Random 50.00 2.40 0.30 0.83 6.00 0.60 0.50 1.10 271.64
Base-Course 50.00 2.40 0.20 0.83 6.00 0.75 1.00 1.75 113.83
SubBase-Course 50.00 2.40 0.20 0.83 6.00 0.75 1.00 1.75 113.83

9. WATER TANK TRUCK, 5000 LTR

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

60 x q x E
Q
Ct
dimana Q = volume angkut per jam ( m3/jam)
q = Kapasitas tangki (m3)
E = Effisiensi alat 0.66
D = Jarak pengambilan (km/jam) 0.50
Va = kecepatan angkut (km/jam) 38.43
Vk = kecepatan kosong (km/jam) 60.00
Ct = waktu siklus (menit)
= Wt + Lt + Cat + Dt + Rt + Ft
Wt = waiting time (menit)
Lt = Loading time (menit)
= (q x 1000)/2106
Cat = Carry time (menit)
= (D / Va) x 60
Dt = Dumping Time (menit)
= (q x 1000)/395,52
Rt = Return time (menit)
= (D / Vk) x 60
Ft = Fix time (menit)
a) Water Tank truck, 5000 ltr

Jenis Pekerjaan q Wt Lt Cat Dt Rt Ft Ct Q

Timbunan Random 5.00 0.00 2.37 0.78 12.64 0.50 0.20 16.50 12.00 0.08331513

10. TAMPING ROLLER

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

Q  A x D x Fk

V x B2 x E
A
N

dimanaQ = kapasitas per jam ( m3/jam)


A = Luasan pemadatan per jam(m2/jam)
B2 = Lebar efektif pemadatan (m)
V = kecepatan kerja
E = faktor managemen kerja
N = jumlah pemadatan
D = Kedalaman pemadatan
f = koefisien konversi volume tanah

a) Tamping Roller, 13,5 ton

Jenis Pekerjaan B1 B2 V E N A D Fk Q

Timbunan Filter 3.40 3.10 2000.00 0.60 8.00 465.00 0.20 0.78 72.54

11. PNEUMATIC TIRE ROLLER

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

V x 1000 x B x 0,04 x Fa
Q
N

dimanaQ = kapasitas per jam ( m3/jam)


V = Kecepatan rata-rata (km/jam)
B = Lebar efektif pemadatan (m)
Fa = Faktor effisiensi alat
n = jumlah lintasan

a) Pneumatic Tire Roller

Jenis Pekerjaan V B Fa N Q

Base-Course 3.50 1.50 0.83 8.00 21.79


SubBase-Course 3.50 1.50 0.83 8.00 21.79

12. AGITATOR TRUCK, 3.2 m3

Rumus untuk menghitung kapasitas produksi per jam adalah sebagai berikut:

60 x W x E
Q
Ts
dimana Q = volume angkut per jam ( m3/jam)
W = volume campuran
E = faktor managemen kerja 0.90
Ts = waktu siklus (menit)
= 2*(DL1/V1 + DL2/V2)*60 + T1 + T2 + T3
T1 = waktu pengisian
T2 = waktu pembongkaran
T3 = waktu diam/tunggu
DL1 = haul distance in open 0.613
DL2 = haul distance in tunnel 0.613
V1 = speed in open (km/jam) 15
V2 = speed in tunnel (km/jam) 8
a) Agitator Truck

Jenis Pekerjaan W T1 T2 T3 Ts Q

Pekerjaan Beton 3.20 1.50 4.00 5.00 24.60 7.02

13. CONCRETE PUMP TRUCK

QqxE

dimana Q = volume angkut per jam ( m3/n)


q = kapasitas alat
E = faktor managemen kerja

a) TM- Concrete Pump, 30 m3/n

Jenis Pekerjaan q E Q

Pekerjaan Beton 30.00 0.40 12.00


ITEM PEMBAYARAN NO. : 2.1
JENIS PEKERJAAN : Galian Material Batu (diameter > 10 cm) Di quarry (dan dibawa kelokasi pekerjaan)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : quarry batu sungai Brazza
3 Kondisi Jalan : sedang
4 Jam kerja efektif per-hari Tk 8.00 jam
5 Faktor pengembangan bahan Fk 1.22 -

II. URUTAN KERJA


1 Penggalian dilakukan dengan menggunakan Excavator
2 Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck
3 Dump Truck membuang material hasil galian keluar
lokasi Pekerjaan Pembuatan Bronjong jalan sejauh L 10.00 Km
4 Sekelompok pekerja akan merapikan hasil galian

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN JUMLAH HAR


Tidak ada bahan yang diperlukan

2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 1.000 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menggali / memuat T1 0.500 menit
- Lain-lain T2 0.290 menit
Ts1 0.790 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 46.50 M3 / jam


Ts1 x Fh

Koefisien Alat / M3 = 1 : Q1 - 0.0215 Jam

2.b. DUMP TRUCK 10 ton (E08) JUMLAH HARGA P


Kaasitas bak V 6.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 Km/Jam
Kecepatan rata-rata kosong v2 60.00 Km/Jam
Waktu siklus : Ts2
- Waktu tempuh isi = (L : v1) x 60 T1 15.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 10.00 menit
- Muat = (V : Q1) x 60 T3 7.74 menit
- Lain-lain T4 0.40 menit
Ts2 33.14 menit
Berlanjut ke halaman be
ITEM PEMBAYARAN NO. : 2.1
JENIS PEKERJAAN : Galian Material Batu (diameter > 10 cm) Di quarry (dan dibawa kelokasi pekerjaan)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Q2 7.39 M3 / Jam


Fk x Ts2

Koefisien Alat / M3 = 1 : Q2 - 0.1353 Jam

2.c. ALAT BANTU


Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang + Sapu

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 46.50 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 372.03 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0430 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0215 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 51,940.87 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
ITEM PEMBAYARAN NO. : 2.2
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 8.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -

II. URUTAN KERJA


1 Tanah yang dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan menggunakan Excavator
3 Selanjutnya Excavator menuangkan material hasil
galian ke pinggir sungai
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh L 0.50 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.70 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -

Waktu siklus Ts1 menit


- Menggali / memuat T1 0.34 menit
- Lain-lain T2 0.29 menit
Ts1 0.63 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 41.50 M3/Jam


Ts1 x Fh

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0241 Jam

2.b. ALAT BANTU


Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang
Kecepatan rata-rata bermuatan v1 50.00 KM/Jam
Kecepatan rata-rata kosong v2 60.00 KM/Jam
Waktu siklus Ts2 menit
- Waktu tempuh isi = (L : v1) x 60 T1 0.60 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 menit
- Muat = (V : Q1) x 60 T3 menit
- Lain-lain T4 menit
Ts2 menit
Berlanjut ke halaman be
ITEM PEMBAYARAN NO. : 2.2
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

Kapasitas Produksi / Jam = Q2 M3/Jam


3. TENAGA
Produksi menentukan : EXCAVATOR Q1 41.50 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 332.00 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0482 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0241 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 15,907.17 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3

ITEM PEMBAYARAN NO. : 2.3


JENIS PEKERJAAN : Timbunan biasa dipadatkan
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SAT
No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang
4 Jam kerja efektif per-hari Tk 8.00 Jam
5 Faktor pengembangan bahan Fk 0.77 -
6 Tebal hamparan padat t 0.30 M

II. URUTAN KERJA


1 Bahan yang dipadatkan berasal dari hasil galian excavator
2 Bahan timbunan berada di sepanjang pinggir sungai
L 5.00 Km
3 Material dihampar dengan menggunakan Motor Grader
4 Hamparan material disiram air dengan Watertank Truck
(sebelum pelaksanaan pemadatan) dan dipadatkan
dengan menggunakan Vibro Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Bahan timbunan = 1 x Fk (M08) 0.77 M3

2. ALAT
2.a. BULLDOZER 15 TON (E15)
Lebar Efektif Spreading W 3.20 M
Kecepatan kerja (m/jam) V 2,000.00 M/Jam
Kedalaman Spreading (m) D 0.30 M
Jumlah spreading N 6.00 kali
Efisiensi Alat E 0.70

Ts1 0.70 menit

Kapasitas Produksi / Jam = W x V x D x E x Fk Q1 172.48 M3


N

Koefisienalat / M3 = 1 : Q1 (E15) 0.0058 Jam

2.b. VIBRATOR ROLLER (E19)


Kecepatan rata-rata alat v 1.50 Km / Jam
Lebar efektif pemadatan b 1.20 M
Jumlah lintasan n 6.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas Prod./Jam = (v x 1000) x b x t x Fa Q4 57.52 M3


n

Koefisien Alat / M3 = 1 : Q4 (E19) 0.0174 Jam

Berlanjut ke halaman be
ITEM PEMBAYARAN NO. : 2.3
JENIS PEKERJAAN : Timbunan biasa dipadatkan
SATUAN PEMBAYARAN : M3 0 URAIAN ANALISA HARGA SAT

No. URAIAN KODE KOEF. SATUAN

2.e. WATER TANK TRUCK (E23)


Volume tangki air V 5.00 M3
Kebutuhan air / M3 material padat Wc 0.20 M3
Pengisian Tangki / jam n 2.00 kali
Faktor efisiensi alat Fa 0.66 -

Kapasitas Produksi / Jam = V x n x Fa Q5 33.00 M3


Wc

Koefisien Alat / M3 = 1 : Q5 (E23) 0.0303 Jam

2.f. ALAT BANTU


Diperlukan alat-alat bantu kecil
- Sekop = 3 buah

3. TENAGA
Produksi menentukan : Water Tank Truck Q1 33.00 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 264.00 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0606 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0303 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 25,776.03 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-21

URAIAN ANALISA HARGA SATUAN

KETERANGAN
Berlanjut ke halaman berikut
Analisa EI-21

URAIAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Lump Sump
Analisa EI-21 Analisa EI-21Analisa EI-21

URAIAN ANALISA HARGA SATUAN U URAIAN ANALISA HARGA SATUAN

U U U U URAIAN ANALISA HARGA SATUAN


KETERANGAN KETERANGKETERANGKETERANGKETERANGAN
KETERANGKETERANGKETERANGKETERANGAN

MenggunakanMenggunakan
a Menggunakan
a Menggunakan
a Menggunakan
a Menggunakan
a Menggunakan
a Menggunakan
a a
Lokasi pekerjLokasi pekerjLokasi pekerjLokasi pekerjLokasi pekerjLokasi pekerjLokasi pekerj
Kondisi JalanKondisi JalanKondisi JalanKondisi JalanKondisi JalanKondisi JalanKondisi Jalan
Jam Jam Jam Jam Jam
- - - - -
- - - - -
- - - - -
URUTAN KEURUTAN KEURUTAN KEURUTAN KEURUTAN KERJA
Tanah yang diTanah yang diTanah yang diTanah yang diTanah yang dipotong umumnya berada disisi jalan
Penggalian d Penggalian d Penggalian d Penggalian d Penggalian dilakukan dengan menggunakan Exca
Selanjutnya ESelanjutnya ESelanjutnya ESelanjutnya ESelanjutnya Excavator menuangkan material hasil
galian ke pin galian ke pin galian ke pin galian ke pin galian ke pinggir sungai
Dump Truck D mump Truck m Dump Truck D mump Truck m Dump Truck membuang material hasil galian kelu
Km Km Km Km Km
Km Km Km Km Km
Km Km Km Km Km
PEMAKAIAN PEMAKAIAN PEMAKAIAN PEMAKAIAN PEMAKAIAN BAHAN, ALAT DAN TENAGA
PEMAKAIAN PEMAKAIAN PEMAKAIAN PEMAKAIAN PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN BAHAN BAHAN BAHAN BAHAN
Tidak ada bahTidak ada bahTidak ada bahTidak ada bahTidak ada bahan yang diperlukan

menit menit menit menit menit menit menit menit


menit menit menit menit menit menit menit
menit menit menit menit menit menit menit
menit menit menit menit menit
M3/Jam M3/Jam M3/Jam M3/Jam M3/Jam
M3/Jam M3/Jam M3/Jam M3/Jam M3/Jam
M3/Jam M3/Jam M3/Jam M3/Jam M3/Jam
Jam Jam Jam Jam Jam
Jam Jam Jam Jam Jam
Jam Jam Jam Jam Jam
ALAT BAN ALAT BAN ALAT BAN ALAT BAN ALAT BANTU
Lump Sump Lump Sump Lump Sump Lump Sump Lump Sump Lump Sump
- Sekop - Sekop - Sekop - Sekop - Sekop
- Keranjang - Keranjang - Keranjang - Keranjang - Keranjang
KM/Jam KM/Jam KM/Jam KM/Jam KM/Jam
KM/Jam KM/Jam KM/Jam KM/Jam KM/Jam
menit menit menit menit menit
menit menit menit menit menit
menit menit menit menit menit
menit menit menit menit menit

Berlanjut ke halaman berikut


Analisa EI-21

URAIAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN KETERANGKETERANGAN

M3/Jam M3/Jam M3/Jam M3/Jam M3/Jam M3/Jam


TENAGA TENAGA TENAGA TENAGA TENAGA
M3/Jam M3/Jam M3/Jam M3/Jam M3/Jam
M3
Kebutuhan tenKebutuhan tenaga : Kebutuhan tenaga :
orang
orang

Analisa EI-21

URAIAN ANALISA HARGA SATUAN


KETERANGAN

Q
W x V x D x E x Fk 
N

Berlanjut ke halaman berikut


0

URAIAN ANALISA HARGA SATUAN


Lanjutan

KETERANGAN

Baik

Lump Sump
ASUMSI
ASUMSI
ASUMSI

-
-
-
80,311.95
I. BILA BAHAN BATU BRONJONG DIAMBILA DARI QUARRY

Diquarry Batu Bronjong


Excavator
Volume Batu 119,103.90 m3
Kapasitas Exc 372.03 m3/hari
Jumlah Alat 2.00 unit
Waktu Kerja 161.00 hari

Dump Truk 10 ton


Keseimbangan Jumlah Alat 13 unit

Alat Di Sungai Biru


Excavator
Volume Galian 198,636.35 m3
Kapasitas Exc 332.00 m3/hari
Jumlah Alat 1 unit 3 unit (setelah diquarry selesai)
Waktu Kerja 599 hari 145 hari
Total Waktu Kerja 309 hari
1.6 tahun (1 tahun 202 hari lihat perhitungan waktu kerja)
Bulldozer
Volume Timbunan 120,603.48 m3 total pemakaian Excavator
Kapasitas Bulldzr 1,379.84 m3/hari
Jumlah Alat 1 unit Diquarry 1 unit 161.00 hari (setelah selesai dipindah ke lokasi pekerjaan
Waktu Kerja 88 hari dengan tambahan waktu 3 hari )
0.5 tahun di lokasi dg 1 unit 164.00 hari
2 unit 180.00 hari
Volume Kupasan 32,221.70 m3
Kapasitas Bulldzr 664.24 m3/hari
Jumlah Alat 1 unit
Waktu Kerja 49 hari
0.3 tahun

total Waktu 0.8 tahun

Vibrator Roller
Volume Timbunan 120,603.48 m3
Kapasitas Vibroller 460.15 m3/hari
Jumlah Alat 1 unit
Waktu Kerja 263 hari
1.4 tahun

Alat Di Sungai Bonto


Excavator
Volume Galian 34,442.00 m3
Kapasitas Exc 332.00 m3/hari
Jumlah Alat 3 unit
Waktu Kerja 35 hari
0.2 tahun (1 tahun 202 hari lihat perhitungan waktu kerja)

Bulldozer
Volume Timbunan 37,249.71 m3
Kapasitas Bulldzr 1,379.84 m3/hari
Jumlah Alat 1 unit
Waktu Kerja 27 hari
0.2 tahun

Volume Kupasan 15,302.47 m3


Kapasitas Bulldzr 664.24 m3/hari
Jumlah Alat 1 unit
Waktu Kerja 24 hari
0.2 tahun

total Waktu 0.4 tahun

Vibrator Roller
Volume Timbunan 37,249.71 m3
Kapasitas Vibroller 460.15 m3/hari
Jumlah Alat 1 unit
Waktu Kerja 81 hari
0.5 tahun
II. BILA BATU BROJONG PENGADAAN/PEMBELIAN

Alat Di Sungai Biru


Excavator
Volume Galian 198,636.35 m3
Kapasitas Exc 332.00 m3/hari
Jumlah Alat 2 unit
Waktu Kerja 300 hari
Total Waktu Kerja 300 hari
1.5 tahun (1 tahun 202 hari lihat perhitungan waktu kerja)
Bulldozer
Volume Timbunan 120,603.48 m3 total pemakaian Excavator
Kapasitas Bulldzr 1,379.84 m3/hari
Jumlah Alat 1 unit Diquarry
Waktu Kerja 88 hari
0.5 tahun di lokasi dg

Volume Kupasan 32,221.70 m3


Kapasitas Bulldzr 664.24 m3/hari
Jumlah Alat 1 unit
Waktu Kerja 49 hari
0.3 tahun

total Waktu 0.8 tahun

Vibrator Roller
Volume Timbunan 120,603.48 m3
Kapasitas Vibroller 460.15 m3/hari
Jumlah Alat 1 unit
Waktu Kerja 263 hari
1.4 tahun

Alat Di Sungai Bonto


Excavator
Volume Galian 34,442.00 m3
Kapasitas Exc 332.00 m3/hari
Jumlah Alat 2 unit
Waktu Kerja 52 hari
0.3 tahun (1 tahun 202 hari lihat perhitungan waktu kerja)

Bulldozer
Volume Timbunan 37,249.71 m3
Kapasitas Bulldzr 1,379.84 m3/hari
Jumlah Alat 1 unit
Waktu Kerja 27 hari
0.2 tahun

Volume Kupasan 15,302.47 m3


Kapasitas Bulldzr 664.24 m3/hari
Jumlah Alat 1 unit
Waktu Kerja 24 hari
0.2 tahun

total Waktu 0.4 tahun

Vibrator Roller
Volume Timbunan 37,249.71 m3
Kapasitas Vibroller 460.15 m3/hari
Jumlah Alat 1 unit
Waktu Kerja 81 hari
0.5 tahun
Perhitungan Jumlah Alat

I. BILA BAHAN BATU BRONJONG DIAMBILA DARI QUARRY


Excavator 3 Unit ( 2 dilokasi Quarry dan 1 Di lokasi Pekerjaan setelah selesai di Biru dilanjut ke Bonto )
Dump Truck 10 ton 13 Unit (dilokasi Quarry )
Bulldozer 1 Unit ( Pekerjaan setelah selesai di Biru Bisa Lanjut ke Bonto )
Vibrator Roller 1 Unit ( Pekerjaan setelah selesai di Biru Bisa Lanjut ke Bonto )
Water tank Truck, 5kltr 1 Unit ( Pekerjaan setelah selesai di Biru Bisa Lanjut ke Bonto )

II. BILA BATU BROJONG PENGADAAN/PEMBELIAN


Excavator 2 Unit ( 2 dilokasi Quarry dan 1 Di lokasi Pekerjaan setelah selesai di Biru dilanjut ke Bonto )
Bulldozer 1 Unit ( Pekerjaan setelah selesai di Biru Bisa Lanjut ke Bonto )
Vibrator Roller 1 Unit ( Pekerjaan setelah selesai di Biru Bisa Lanjut ke Bonto )
Water tank Truck, 5kltr 1 Unit ( Pekerjaan setelah selesai di Biru Bisa Lanjut ke Bonto )

Kapasitas
Excavator Quarry batu 46.50
Excavator Galian 41.50
Dump Truck 10 ton 7.39
Bulldozer 172.48
Vibrator Roller 57.52
Water tank Truck, 5kltr 33.00

Dalam penggunaan alat pada perhitungan RAB ini, digunakan alternatif 2 ( batu bronjong diperoleh melalui pengadaan/pembelian).
ANALISA HARGA SATUAN

JENIS PEKERJAAN : MOBILISASI DAN DEMOBILISASI


SATUAN : LS
HARGA : RP, 348,750,000

No. URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA


(Rp,) (Rp,)
1 MOBILISASI
- Excavator Unit 2.00 34,875,000.00 69,750,000.00
- Dump truck Unit 0.00 34,875,000.00 0.00
- Bulldozer Unit 1.00 34,875,000.00 34,875,000.00
- Vibrator Roller Unit 1.00 34,875,000.00 34,875,000.00
- Water Tank Truck, 5000 liter Unit 1.00 34,875,000.00 34,875,000.00
Sub Total 1 174,375,000.00

2 DEMOBILISASI
- Excavator Unit 2.00 34,875,000.00 69,750,000.00
- Dump truck Unit 0.00 34,875,000.00 0.00
- Bulldozer Unit 1.00 34,875,000.00 34,875,000.00
- Vibrator Roller Unit 1.00 34,875,000.00 34,875,000.00
- Water Tank Truck, 5000 liter Unit 1.00 34,875,000.00 34,875,000.00
Sub Total 2 174,375,000.00

Total 348,750,000.00

JENIS PEKERJAAN : MOBILISASI DAN DEMOBILISASI


ALAT : Hellicopter
HARGA : RP, 34,875,000

No. URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA


(Rp,) (Rp,)

1 Sewa Jam 2.50 13,950,000.00 34,875,000.00

Total 34,875,000.00
ANALISA HARGA SATUAN PEKERJAAN

Nomor Jenis Pekerjaan : ………………………………………………………………


Jenis Pekerjaan : Galian Tanah
Satuan Pekerjaan : M3
Kuantitas Pekerjaan : 1.0
Jumlah Harga Satuan 53,750.00

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT. KOEFISIEN VOLUME KETERANGAN
(RP.) (RP.)

1 2 3 4 5 6 7=4x5x6 8
MATERIAL
1
2
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. A

TENAGA KERJA
1 Pekerja Org / Hr 0.750 1.0 65,000.00 48,750.00
2 Mandor Org / Hr 0.025 1.0 120,000.00 3,000.00
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 51,750.00 B

ALAT KERJA
1 Alat Bantu Ls 1.000 1.0 2000.00 2000.00
2
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 2,000.00 C

JUMLAH …………………………………………………………………………………………………………………… 53,750.00 D=A+B+C


DIBULATKAN ………………………………………………………………………………………………………………… 53,750.00 E
ANALISA HARGA SATUAN PEKERJAAN

Nomor Jenis Pekerjaan : ………………………………………………………………


Jenis Pekerjaan : Galian Tanah (menggunakan Alat Berat)
Satuan Pekerjaan : M3
Kuantitas Pekerjaan : 1.0
Jumlah Harga Satuan 13,040.00

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT. KOEFISIEN VOLUME KETERANGAN
(RP.) (RP.)

1 2 3 4 5 6 7=4x5x6 8
MATERIAL
1
2
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. A

TENAGA KERJA
1 Pekerja Org / Hr 0.075 1.0 65,000.00 4,875.00
2 Mandor Org / Hr 0.025 1.0 120,000.00 3,000.00
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 7,875.00 B

ALAT KERJA
1 Excavator Jam 0.019 1.0 267,134.24 5,162.99
2
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 5,162.99 C

JUMLAH …………………………………………………………………………………………………………………… 13,037.99 D=A+B+C


DIBULATKAN ………………………………………………………………………………………………………………… 13,040.00 E
ANALISA HARGA SATUAN PEKERJAAN

Nomor Jenis Pekerjaan : ………………………………………………………………


Jenis Pekerjaan : Galian Tanah Dipindahkan
Satuan Pekerjaan : M3
Kuantitas Pekerjaan : 1.0
Jumlah Harga Satuan 46,410.00

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT. KOEFISIEN VOLUME KETERANGAN
(RP.) (RP.)

1 2 3 4 5 6 7=4x5x6 8
MATERIAL

1
2
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. A

TENAGA KERJA

1 Pekerja Org / Hr 0.075 1.0 65,000.00 4,875.00


2 Mandor Org / Hr 0.008 1.0 120,000.00 900.00
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 5,775.00 B

ALAT KERJA

1 Excavator Jam 0.018 1.0 267,134.24 4,787.00


2 Dump Truck Jam 0.138 1.0 259,382.35 35,850.31
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 40,637.31 C

JUMLAH …………………………………………………………………………………………………………………… 46,412.31 D=A+B+C

DIBULATKAN ………………………………………………………………………………………………………………… 46,410.00 E


ANALISA HARGA SATUAN PEKERJAAN

Nomor Jenis Pekerjaan : ………………………………………………………………


Jenis Pekerjaan : Tanah galian ditimbun dan dipadatkan
Satuan Pekerjaan : M3
Kuantitas Pekerjaan : 1.0
Jumlah Harga Satuan 20,110.00

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT. KOEFISIEN VOLUME KETERANGAN
(RP.) (RP.)

1 2 3 4 5 6 7=4x5x6 8
MATERIAL
1
2
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 0.00 A

TENAGA KERJA
1 Pekerja Org / Hr 0.050 1.0 65,000.00 3,250.00
2 Mandor Org / Hr 0.025 1.0 120,000.00 3,000.00
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 6,250.00 B

ALAT KERJA
1 Bulldozer Jam 0.006 1.0 368,105.40 2,134.19
2 Vibrator Roller Jam 0.017 1.0 281,244.97 4,889.60
3 Water Tank Truck Jam 0.030 1.0 225,495.82 6,833.21
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 13,857.00 C

JUMLAH …………………………………………………………………………………………………………………… 20,107.00 D=A+B+C


DIBULATKAN ………………………………………………………………………………………………………………… 20,110.00 E
ANALISA HARGA SATUAN PEKERJAAN

Nomor Jenis Pekerjaan : ………………………………………………………………


Jenis Pekerjaan : Bronjong Kawat Galvanis Anyaman Tangan Ø 3mm Termasuk Isian Batu
Satuan Pekerjaan : M3
Kuantitas Pekerjaan : 1.0
Jumlah Harga Satuan 468,110.00

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT. KOEFISIEN VOLUME KETERANGAN
(RP.) (RP.)

1 2 3 4 5 6 7=4x5x6 8
MATERIAL

1 Kawat Bronjong Ø 3 mm M3 14.000 1.0 12,000.00 168,000.00


2 Batu Kali / Batu belah (Sungai/Gunung) M 3
1.200 1.0 85,600.00 102,720.00
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 270,720.00 A

TENAGA KERJA

1 Pekerja Pengisi Org / Hr 1.382 1.0 65,000.00 89,830.00


2 Mandor Org / Hr 0.026 1.0 120,000.00 3,120.00
3 Pekerja Penganyam Org / Hr 1.576 1.0 65,000.00 102,440.00
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 195,390.00 B

ALAT KERJA

1 Alat Bantu Ls 1.000 1.0 2,000.00 2,000.00


2
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 2,000.00 C

JUMLAH …………………………………………………………………………………………………………………… 468,110.00 D=A+B+C

DIBULATKAN ………………………………………………………………………………………………………………… 468,110.00 E


ANALISA HARGA SATUAN PEKERJAAN

Nomor Jenis Pekerjaan : ………………………………………………………………


Jenis Pekerjaan : Bronjong Pabrikasi Kawat Galvanis Ø 3mm ukuran(2.0x1.0x0.5)m Termasuk Isian Batu
Satuan Pekerjaan : M3
Kuantitas Pekerjaan : 1.0
Jumlah Harga Satuan 447,670.00

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT. KOEFISIEN VOLUME KETERANGAN
(RP.) (RP.)

1 2 3 4 5 6 7=4x5x6 8
MATERIAL

1 Bronjong Pabrikasi (Ø 3 mm lobang 80x100 mm) Lbr 1.000 1.0 250,000.00 250,000.00
2 Batu Kali / Batu belah (Sungai/Gunung) M 3
1.200 1.0 85,600.00 102,720.00
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 352,720.00 A

TENAGA KERJA

1 Pekerja Pengisi Org / Hr 1.382 1.0 65,000.00 89,830.00


2 Mandor Org / Hr 0.026 1.0 120,000.00 3,120.00
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 92,950.00 B

ALAT KERJA

1 Alat Bantu Ls 1.000 1.0 2,000.00 2,000.00


2
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 2,000.00 C

JUMLAH …………………………………………………………………………………………………………………… 447,670.00 D=A+B+C

DIBULATKAN ………………………………………………………………………………………………………………… 447,670.00 E


ANALISA HARGA SATUAN PEKERJAAN

Nomor Jenis Pekerjaan : ………………………………………………………………


Jenis Pekerjaan : Pasangan Batu Kali 1 PC : 4 Ps
Satuan Pekerjaan : M3
Kuantitas Pekerjaan : 1.0
Jumlah Harga Satuan 1,564,350.00

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT. KOEFISIEN VOLUME KETERANGAN
(RP.) (RP.)

1 2 3 4 5 6 7=4x5x6 8
MATERIAL
1 Batu Kali / Batu belah (Sungai/
Gunung) M3 1.200 1.0 85,600.00 102,720.00
2 Pasir Pasang M 3
0.456 1.0 77,000.00 35,112.00
3 PC (40 Kg / Zak) Zak 4.050 1.0 300,000.00 1,215,000.00
4
5
6
SUB JUMLAH ………………………………………………………………………………………….. 1,352,832.00 A

TENAGA KERJA
1 Pekerja Org / Hr 1.440 1.0 65,000.00 93,600.00
2 Tukang Batu Org / Hr 0.960 1.0 85,000.00 81,600.00
3 Kepala Tukang Org / Hr 0.096 1.0 100,000.00 9,600.00
4 Mandor Org / Hr 0.144 1.0 120,000.00 17,280.00
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 202,080.00 B

ALAT KERJA
1 Molen Jam 0.201 1.0 37,003.54 7,437.71
2 Alat Bantu Ls 1.000 1.0 2,000.00 2,000.00
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 9,437.71 C

JUMLAH …………………………………………………………………………………………………………………… 1,564,349.71 D=A+B+C


DIBULATKAN ………………………………………………………………………………………………………………… 1,564,350.00 E
ANALISA HARGA SATUAN PEKERJAAN

Nomor Jenis Pekerjaan : ………………………………………………………………


Jenis Pekerjaan : Pasangan Batu Kosong
Satuan Pekerjaan : M3
Kuantitas Pekerjaan : 1.0
Jumlah Harga Satuan 346,880.00

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT. KOEFISIEN VOLUME KETERANGAN
(RP.) (RP.)

1 2 3 4 5 6 7=4x5x6 8
MATERIAL
1 Batu Kali / Batu belah (Sungai/
Gunung) M3 1.200 1.0 85,600.00 102,720.00
2
3
4
5
6
SUB JUMLAH ………………………………………………………………………………………….. 102,720.00 A

TENAGA KERJA
1 Pekerja Org / Hr 1.500 1.0 65,000.00 97,500.00
2 Tukang Batu Org / Hr 0.960 1.0 85,000.00 81,600.00
3 Kepala Tukang Org / Hr 0.096 1.0 100,000.00 9,600.00
4 Mandor Org / Hr 0.075 1.0 120,000.00 9,000.00
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 197,700.00 B

ALAT KERJA
1 Dump Truck Jam 0.125 1.0 250,237.50 31,279.69
2 Excavator Jam 0.062 1.0 243,308.75 15,182.47
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 46,462.15 C

JUMLAH …………………………………………………………………………………………………………………… 346,882.15 D=A+B+C


DIBULATKAN ………………………………………………………………………………………………………………… 346,880.00 E
ANALISA HARGA SATUAN PEKERJAAN

Nomor Jenis Pekerjaan : ………………………………………………………………


Jenis Pekerjaan : Beton Mutu K - 225
Satuan Pekerjaan : M3
Kuantitas Pekerjaan : 1.0
Jumlah Harga Satuan 2,969,950.00

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT. KOEFISIEN VOLUME KETERANGAN
(RP.) (RP.)

1 2 3 4 5 6 7=4x5x6 8
MATERIAL
1 Batu Pecah / Split 2-3cm M3 0.960 1.0 140,000.00 134,400.00
2 Pasir Beton M3 0.540 1.0 54,600.00 29,484.00
3 PC (40 Kg / Zak ) Zak 7.150 1.0 300,000.00 2,145,000.00
4 Pembesian Kg 10 1.0 26,640.00 266,400.00
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 2,575,284.00 A

TENAGA KERJA
1 Pekerja Org / Hr 4.800 1.0 65,000.00 312,000.00
2 Tukang Batu Org / Hr 0.400 1.0 85,000.00 34,000.00
3 Kepala Tukang Org / Hr 0.040 1.0 100,000.00 4,000.00
4 Mandor Org / Hr 0.240 1.0 120,000.00 28,800.00
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 378,800.00 B

ALAT KERJA
1 Concrete Mixer Jam 0.200 1.0 37,003.54 7,400.71
2 Concrete Vibrator Jam 0.200 1.0 39,817.25 7,963.45
3 Alat Bantu Ls 1.000 1.0 500.00 500.00
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 15,864.16 C

JUMLAH …………………………………………………………………………………………………………………… 2,969,948.16 D=A+B+C


DIBULATKAN ………………………………………………………………………………………………………………… 2,969,950.00 E
ANALISA HARGA SATUAN PEKERJAAN

Nomor Jenis Pekerjaan : ………………………………………………………………


Jenis Pekerjaan : Pembesian Dengan Besi Biasa (Polos)
Satuan Pekerjaan : Kg
Kuantitas Pekerjaan : 1.0
Jumlah Harga Satuan 26,640.00

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT. KOEFISIEN VOLUME KETERANGAN
(RP.) (RP.)

1 2 3 4 5 6 7=4x5x6 8
MATERIAL
1 Besi Beton Kg 110.000 1.0 11,565.96 1,272,255.60
2 Kawat Beton Kg 2.000 1.0 7,500.00 15,000.00
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 1,287,255.60 A

TENAGA KERJA
1 Pekerja Org / Hr 8.640 1.0 65,000.00 561,600.00
2 Tukang Besi Org / Hr 8.640 1.0 85,000.00 734,400.00
3 Mandor Org / Hr 2.880 1.0 120,000.00 345,600.00
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 1,641,600.00 B

ALAT KERJA
1 Gunting Pemotong Baja Bh 0.020 1.0 44,000.00 880.00
2 Kunci Pembelok Tulang Bh 0.010 1.0 3,570.00 35.70
3 Alat Bantu Ls 1.000 1.0 500.00 500.00
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 1415.70 C

TOTAL HARGA SATUAN PER 110 KG ………………….…………………………………………………………… 2,930,271.30 D=A+B+C


TOTAL HARGA SATUAN PER 1 KG ....………………….……………………………………………….. 26,638.83 E
DIBULATKAN ………………………………………………………………………………………………………………… 26,640.00 F
ANALISA HARGA SATUAN PEKERJAAN

Nomor Jenis Pekerjaan : ………………………………………………………………


Jenis Pekerjaan : Plasteran Campuran 1 PC : 3 Ps
Satuan Pekerjaan : M2
Kuantitas Pekerjaan : 1.0
Jumlah Harga Satuan 90,430.00

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT. KOEFISIEN VOLUME KETERANGAN
(RP.) (RP.)

1 2 3 4 5 6 7=4x5x6 8
MATERIAL
1 Pasir Pasang M3 0.022 1.0 77,000.00 1,694.00
2 PC (40 Kg / Zak) Zak 0.192 1.0 300,000.00 57,600.00
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 59,294.00 A

TENAGA KERJA
1 Pekerja Org / Hr 0.384 1.0 65,000.00 24,960.00
2 Kepala Tukamg Org / Hr 0.019 1.0 100,000.00 1,900.00
3 Mandor Org / Hr 0.019 1.0 120,000.00 2,280.00
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 29,140.00 B

ALAT KERJA
1 Alat Bantu Ls 1.000 1.0 2,000.00 2,000.00
2
3
4
5
6
7
SUB JUMLAH ………………………………………………………………………………………….. 2,000.00 C

JUMLAH …………………………………………………………………………………………………………………… 90,434.00 D=A+B+C


DIBULATKAN ………………………………………………………………………………………………………………… 90,430.00 E
REKAPITULASI ANGGARAN BIAYA
ALTERNATIF I
KEGIATAN : DETAIL DESAIN PENGENDALIAN BANJIR SUNGAI DI KABUPATEN YAHUKIMO
LOKASI : KABUPATEN YAHUKIMO

NO URAIAN TOTAL HARGA


( Rp. )

1 PEKERJAAN PERSIAPAN 384,000,000.00

2 BANGUNAN DAN NORMALISASI SUNGAI BIRU (BM1 - P44) 15,127,907,914.00

3 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P44 - P90) 13,092,879,974.00

4 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P90 - P130) 12,157,494,683.00

5 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P130 - P156) 9,692,327,575.00

6 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P156 - P168) 4,458,591,452.00

7 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P168 - P191) 6,302,935,324.00

8 REGULATOR SUNGAI BONTO ALTERNATIF I 3,822,089,684.00

9 BANGUNAN DAN NORMALISASI SUNGAI BONTO 1,320,782,081.00

Jumlah 66,359,008,687.00
PPN 10% 6,635,900,868.70
Total 72,994,909,555.70
Dibulatkan 72,994,000,000.00
REKAPITULASI ANGGARAN BIAYA
ALTERNATIF II
KEGIATAN : DETAIL DESAIN PENGENDALIAN BANJIR SUNGAI DI KABUPATEN YAHUKIMO
LOKASI : KABUPATEN YAHUKIMO

NO URAIAN

1 PEKERJAAN PERSIAPAN

2 BANGUNAN DAN NORMALISASI SUNGAI BIRU (BM1 - P44)

3 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P44 - P90)

4 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P90 - P130)

5 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P130 - P156)

6 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P156 - P168)

7 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P168 - P191)

8 REGULATOR SUNGAI BONTO ALTERNATIF II

9 BANGUNAN DAN NORMALISASI SUNGAI BONTO

Jumlah
PPN 10%
Total
Dibulatkan
GARAN BIAYA
F II
NGAI DI KABUPATEN YAHUKIMO

TOTAL HARGA
( Rp. )

384,000,000.00

15,127,907,914.00

13,092,879,974.00

12,157,494,683.00

9,692,327,575.00

4,458,591,452.00

6,302,935,324.00

3,115,750,338.00

1,320,782,081.00

65,652,669,341.00
6,565,266,934.10
72,217,936,275.10
72,217,000,000.00
RENCANA ANGGARAN BIAYA
ALTERNATIF I
PEKERJAAN : DETAIL DESAIN PENGENDALIAN BANJIR SUNGAI DI KABUPATEN YAHUKIMO
LOKASI : KABUPATEN YAHUKIMO

HARGA TOTAL
NO URAIAN VOLUME SATUAN BIAYA
( Rp. ) ( Rp. )

1 PEKERJAAN PERSIAPAN 384,000,000.00


a Pembersihan Lokasi 1 Ls 5,000,000.00 5,000,000.00
b Direksi Ket 1 Ls 7,000,000.00 7,000,000.00
c Barak Kerja 1 Ls 7,000,000.00 7,000,000.00
d Pengukuran, Pemasangan Profil dan Bouwplank 1 Ls 15,000,000.00 15,000,000.00
e Mobilisasi dan Demobilisasi 1 Ls 349,000,000.00 349,000,000.00
f Papan Nama Proyek 1 Ls 1,000,000.00 1,000,000.00
2 BANGUNAN DAN NORMALISASI SUNGAI BIRU (BM1 - P44) 15,127,907,914.00
a Galian Tanah Menggunakan Alat Berat 55,112 m3 13,040.00 718,654,487.00
b Tanah Galian Ditimbun Dipadatkan 25,222 m 3
20,110.00 507,206,071.00
c Pasangan Batu Kali 1 : 4 920 m 3
1,564,350.00 1,438,908,588.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 26,123 m3 468,110.00 12,228,543,904.00
e Plasteran 1 : 3 2,594 m2 90,430.00 234,594,864.00
3 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P44 - P90) 13,092,879,974.00
a Galian Tanah Menggunakan Alat Berat 60,246 m3 13,040.00 785,606,796.00
b Tanah Galian Ditimbun Dipadatkan 23,659 m3 20,110.00 475,779,746.00
c Pasangan Batu Kali 1 : 4 715 m 3
1,564,350.00 1,119,151,124.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 22,494 m 3
468,110.00 10,529,879,636.00
e Plasteran 1 : 3 2,018 m2 90,430.00 182,462,672.00
4 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P90 - P130) 12,157,494,683.00
a Galian Tanah Menggunakan Alat Berat 45,395 m3 13,040.00 591,946,682.00
b Tanah Galian Ditimbun Dipadatkan 26,849 m 3
20,110.00 539,933,107.00
c Pasangan Batu Kali 1 : 4 307 m3 1,564,350.00 479,636,196.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 22,362 m 3
468,110.00 10,467,780,410.00
e Plasteran 1 : 3 865 m 2
90,430.00 78,198,288.00
5 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P130 - P156) 9,692,327,575.00
a Galian Tanah Menggunakan Alat Berat 27,690 m3 13,040.00 361,079,176.00
b Tanah Galian Ditimbun Dipadatkan 20,084 m3 20,110.00 403,897,721.00
c Pasangan Batu Kali 1 : 4 511 m 3
1,564,350.00 799,393,660.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 17,085 m3 468,110.00 7,997,626,538.00
e Plasteran 1 : 3 1,441 m2 90,430.00 130,330,480.00
6 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P156 - P168) 4,458,591,452.00
a Galian Tanah Menggunakan Alat Berat 16,821 m3 13,040.00 219,352,104.00
b Tanah Galian Ditimbun Dipadatkan 9,659 m 3
20,110.00 194,244,634.00
c Pasangan Batu Kali 1 : 4 204 m 3
1,564,350.00 319,757,464.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 7,847 m3 468,110.00 3,673,105,058.00
e Plasteran 1 : 3 576 m2 90,430.00 52,132,192.00
7 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P168 - P191) 6,302,935,324.00
a Galian Tanah Menggunakan Alat Berat 25,594 m3 13,040.00 333,749,797.00
b Tanah Galian Ditimbun Dipadatkan 15,131 m3 20,110.00 304,274,787.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 12,102 m 3
468,110.00 5,664,910,740.00
8 REGULATOR SUNGAI BONTO ALTERNATIF I 3,822,089,684.00
a Galian Tanah Menggunakan Alat Berat 5,438 m3 13,040.00 70,915,540.00
b Tanah Galian Ditimbun Dipadatkan 241 m 3
20,110.00 4,840,246.00
c Pasangan Batu Kali 1 : 4 678 m3 1,564,350.00 1,060,299,748.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 5,292 m3 468,110.00 2,477,447,510.00
e Plasteran 1 : 3 325 m2 90,430.00 29,346,430.00
f Beton Bertulang K 225 60 m 3
2,969,950.00 179,240,210.00
9 BANGUNAN DAN NORMALISASI SUNGAI BONTO 1,320,782,081.00
a Galian Tanah Menggunakan Alat Berat 38,953 m3 13,040.00 507,941,557.00
b Tanah Galian Ditimbun Dipadatkan 36,768 m 3
20,110.00 739,411,141.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 157 m3 468,110.00 73,429,383.00

Jumlah 66,359,008,687.00
PPN 10% 6,635,900,868.70
Total 72,994,909,555.70
Dibulatkan 72,994,000,000.00
RENCANA ANGGARAN BIAYA
ALTERNATIF II
PEKERJAAN : DETAIL DESAIN PENGENDALIAN BANJIR SUNGAI DI KABUPATEN YAHUKIMO
LOKASI : KABUPATEN YAHUKIMO

HARGA TOTAL
NO URAIAN VOLUME SATUAN BIAYA
( Rp. ) ( Rp. )

1 PEKERJAAN PERSIAPAN 384,000,000.00


a Pembersihan Lokasi 1 Ls 5,000,000.00 5,000,000.00
b Direksi Ket 1 Ls 7,000,000.00 7,000,000.00
c Barak Kerja 1 Ls 7,000,000.00 7,000,000.00
d Pengukuran, Pemasangan Profil dan Bouwplank 1 Ls 15,000,000.00 15,000,000.00
e Mobilisasi dan Demobilisasi 1 Ls 349,000,000.00 349,000,000.00
f Papan Nama Proyek 1 Ls 1,000,000.00 1,000,000.00
2 BANGUNAN DAN NORMALISASI SUNGAI BIRU (BM1 - P44) 15,127,907,914.00
a Galian Tanah Menggunakan Alat Berat 55,112 m3 13,040.00 718,654,487.00
b Tanah Galian Ditimbun Dipadatkan 25,222 m 3
20,110.00 507,206,071.00
c Pasangan Batu Kali 1 : 4 920 m 3
1,564,350.00 1,438,908,588.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 26,123 m3 468,110.00 12,228,543,904.00
e Plasteran 1 : 3 2,594 m2 90,430.00 234,594,864.00
3 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P44 - P90) 13,092,879,974.00
a Galian Tanah Menggunakan Alat Berat 60,246 m3 13,040.00 785,606,796.00
b Tanah Galian Ditimbun Dipadatkan 23,659 m3 20,110.00 475,779,746.00
c Pasangan Batu Kali 1 : 4 715 m 3
1,564,350.00 1,119,151,124.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 22,494 m 3
468,110.00 10,529,879,636.00
e Plasteran 1 : 3 2,018 m2 90,430.00 182,462,672.00
4 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P90 - P130) 12,157,494,683.00
a Galian Tanah Menggunakan Alat Berat 45,395 m3 13,040.00 591,946,682.00
b Tanah Galian Ditimbun Dipadatkan 26,849 m 3
20,110.00 539,933,107.00
c Pasangan Batu Kali 1 : 4 307 m3 1,564,350.00 479,636,196.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 22,362 m 3
468,110.00 10,467,780,410.00
e Plasteran 1 : 3 865 m 2
90,430.00 78,198,288.00
5 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P130 - P156) 9,692,327,575.00
a Galian Tanah Menggunakan Alat Berat 27,690 m3 13,040.00 361,079,176.00
b Tanah Galian Ditimbun Dipadatkan 20,084 m3 20,110.00 403,897,721.00
c Pasangan Batu Kali 1 : 4 511 m 3
1,564,350.00 799,393,660.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 17,085 m3 468,110.00 7,997,626,538.00
e Plasteran 1 : 3 1,441 m2 90,430.00 130,330,480.00
6 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P156 - P168) 4,458,591,452.00
a Galian Tanah Menggunakan Alat Berat 16,821 m3 13,040.00 219,352,104.00
b Tanah Galian Ditimbun Dipadatkan 9,659 m 3
20,110.00 194,244,634.00
c Pasangan Batu Kali 1 : 4 204 m 3
1,564,350.00 319,757,464.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 7,847 m3 468,110.00 3,673,105,058.00
e Plasteran 1 : 3 576 m2 90,430.00 52,132,192.00
7 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P168 - P191) 6,302,935,324.00
a Galian Tanah Menggunakan Alat Berat 25,594 m3 13,040.00 333,749,797.00
b Tanah Galian Ditimbun Dipadatkan 15,131 m3 20,110.00 304,274,787.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 12,102 m 3
468,110.00 5,664,910,740.00
8 REGULATOR SUNGAI BONTO ALTERNATIF II 3,115,750,338.00
a Galian Tanah Menggunakan Alat Berat 5,354 m3 13,040.00 69,810,779.00
b Tanah Galian Ditimbun Dipadatkan 241 m 3
20,110.00 4,840,246.00
c Pasangan Batu Kali 1 : 4 247 m3 1,564,350.00 387,097,483.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 5,642 m3 468,110.00 2,641,005,144.00
e Plasteran 1 : 3 144 m2 90,430.00 12,996,686.00
9 BANGUNAN DAN NORMALISASI SUNGAI BONTO 1,320,782,081.00
a Galian Tanah Menggunakan Alat Berat 38,953 m 3
13,040.00 507,941,557.00
b Tanah Galian Ditimbun Dipadatkan 36,768 m3 20,110.00 739,411,141.00
d Bronjong Pabrikasi Ø 3mm Ukuran(2.0x1.0x0.5)m 157 m 3
468,110.00 73,429,383.00

Jumlah 65,652,669,341.00
PPN 10% 6,565,266,934.10
Total 72,217,936,275.10
Dibulatkan 72,217,000,000.00
REKAP VOLUME
PEKERJAAN : DETAIL DESAIN PENGENDALIAN BANJIR SUNGAI DI KABUPATEN YAHUKIMO
LOKASI : KABUPATEN YAHUKIMO

Beton
Galian Timbunan Kupasan Bronjong Ps Batu Plesteran
Pekerjaan Bertulang
(m3) (m3) (m3) (m3) (m3) (m2) (m3)
Regulator Sungai Bonto Alternatif I 5,438.31 240.69 - 5,292.45 677.79 324.52 60.35
Regulator Sungai Bonto Alternatif II 5,353.59 240.69 - 5,641.85 247.45 143.72 -
Bangunan Dan Normalisasi Sungai Bonto 23,650.11 36,768.33 15,302.47 156.86 - - -
Bangunan Dan Normalisasi Sungai Biru (BM1 - P44) 47,274.57 25,221.58 7,836.97 26,123.23 919.81 2,594.22 -
Bangunan Dan Normalisasi Sungai Biru (P44 - P90) 53,497.58 23,658.86 6,748.34 22,494.46 715.41 2,017.72 -
Bangunan Dan Normalisasi Sungai Biru (P90 - P130) 38,751.37 26,848.99 6,643.32 22,361.80 306.60 864.74 -
Bangunan Dan Normalisasi Sungai Biru (P130 - P156) 22,681.54 20,084.42 5,008.58 17,084.93 511.01 1,441.23 -
Bangunan Dan Normalisasi Sungai Biru (P156 - P168) 14,467.48 9,659.11 2,354.00 7,846.67 204.40 576.49 -
Bangunan Dan Normalisasi Sungai Biru (P168 - P191) 21,963.81 15,130.52 3,630.50 12,101.67 - - -
VOLUME TANGGUL DAN NORMALISASI SUNGAI BIRU

Pekerjaan : Detail Desain Pengendalian Banjir Sungai Di Kabupaten Yahukimo


Lokasi : Kabupaten Yahukimo

Luas Volume
Patok jarak Galian TimbunanKupasanBronjong Galian Timbunan Kupasan Bronjong
(m) (m2) (m2) (m) (m2) (m3) (m3) (m3) (m3)

BM1 0.00 6.84 18.13 27.02 8.00


P1 25.00 5.59 10.54 25.04 8.00 155.37 358.37 195.22 650.74
P2 43.63 23.76 11.41 10.22 8.00 640.31 478.87 230.77 769.24
P3 33.63 23.38 11.42 10.24 8.00 792.70 383.90 103.22 344.05
P4 47.86 44.31 2.77 7.21 8.00 1619.71 339.54 125.26 417.55
P5 49.43 27.23 9.00 9.42 8.00 1768.24 290.92 123.31 411.04
P6 50.57 27.62 7.63 8.97 8.00 1386.90 420.50 139.50 465.00
P7 52.04 28.79 9.47 9.60 8.00 1467.69 444.91 144.95 483.16
P8 51.91 36.72 5.04 8.06 8.00 1700.20 376.58 137.50 458.33
P9 49.89 34.82 6.06 8.38 8.00 1784.50 276.88 123.02 410.08
P10 49.87 29.73 8.57 9.28 8.00 1609.42 364.77 132.09 440.31
P11 49.93 29.73 9.16 9.50 8.00 1484.36 442.61 140.65 468.83
P12 50.04 32.80 7.53 8.93 8.00 1564.36 417.55 138.32 461.08
P13 49.99 29.69 9.41 9.58 8.00 1561.98 423.43 138.80 462.67
P14 50.19 17.01 13.56 10.80 8.00 1171.95 576.44 153.43 511.44
P15 25.98 21.97 11.73 10.30 8.00 506.27 328.47 82.21 274.05
P16 23.94 28.45 8.66 9.34 8.00 603.47 244.04 70.52 235.07
P17 34.39 13.65 13.56 13.12 8.00 723.86 382.05 115.85 386.17
P18 49.93 15.68 17.02 11.71 8.00 732.22 763.43 185.96 619.88
P19 49.79 12.50 14.61 20.21 8.00 701.54 787.43 238.39 794.65
P20 50.04 10.13 13.78 21.68 8.00 566.23 710.35 314.44 1048.13
P21 50.04 27.01 8.65 9.40 8.00 929.26 561.21 233.29 777.64
P22 50.00 23.14 10.74 10.02 8.00 1253.70 484.73 145.64 485.48
P23 47.02 23.13 17.53 11.25 8.00 1087.72 664.57 150.01 500.02
P24 51.20 12.64 14.11 15.30 8.00 915.63 809.91 203.89 679.62
P25 49.40 36.53 4.86 8.07 8.00 1214.42 468.53 173.16 577.20
P26 49.93 54.99 2.72 7.38 8.00 2284.75 189.23 115.71 385.70
P27 53.01 45.17 2.42 4.00 8.00 2654.58 136.23 90.48 301.61
P28 50.17 54.03 1.50 5.40 8.00 2488.60 98.34 70.74 235.82
P29 25.46 17.29 8.80 14.62 8.00 907.94 131.12 76.46 254.86
P30 49.73 30.00 8.41 10.90 8.00 1175.90 427.94 190.37 634.58
P31 50.23 4.04 19.06 33.68 8.00 854.88 689.88 335.87 1119.58
P32 51.16 14.10 22.08 27.81 8.00 464.05 1052.43 471.91 1573.02
P33 51.04 19.85 16.50 11.76 8.00 866.46 984.63 302.97 1009.90
P34 50.00 3.39 29.27 21.72 8.00 581.00 1144.24 251.10 836.99
P35 50.00 2.86 37.33 30.88 8.00 156.25 1665.02 394.50 1315.01
P36 50.00 2.24 20.86 12.71 8.00 127.50 1454.73 326.92 1089.74
P37 50.00 3.58 21.46 12.81 8.00 145.50 1058.00 191.40 638.00
P38 50.00 4.89 18.32 12.02 8.00 211.75 994.49 186.22 620.74
P39 50.00 5.68 19.21 12.26 8.00 264.25 938.26 182.10 607.00
P40 50.00 6.80 18.51 12.10 8.00 312.00 943.01 182.70 609.01
P41 50.15 43.92 2.53 7.17 8.00 1271.81 527.58 144.96 483.20
P42 53.31 18.58 9.49 9.60 8.00 1665.97 320.40 134.10 447.01
P43 44.83 23.71 8.13 9.22 8.00 947.90 394.94 126.55 421.84
Luas Volume
Patok jarak Galian TimbunanKupasanBronjong Galian Timbunan Kupasan Bronjong
(m) (m2) (m2) (m) (m2) (m3) (m3) (m3) (m3)
P44 49.48 39.93 2.83 7.28 8.00 1574.49 271.16 122.47 408.22
P45 34.23 24.48 7.83 9.05 8.00 1102.32 182.44 83.84 279.47
P46 50.00 24.78 9.04 9.49 8.00 1231.49 421.74 139.05 463.49
P47 50.00 37.14 1.24 6.63 8.00 1548.02 257.00 120.90 403.01
P48 50.00 39.42 5.64 8.32 8.00 1913.98 172.00 112.12 373.75
P49 50.18 26.42 7.72 9.03 8.00 1651.93 335.20 130.59 435.31
P50 50.54 24.50 8.05 9.15 8.00 1286.80 398.52 137.83 459.43
P51 50.72 33.69 7.41 8.94 8.00 1475.56 392.03 137.62 458.72
P52 54.99 31.67 8.36 9.27 8.00 1797.00 433.58 150.20 500.66
P53 51.79 26.18 8.37 9.29 8.00 1497.97 433.21 144.18 480.59
P54 51.28 47.26 7.54 9.01 8.00 1882.82 407.89 140.75 469.17
P55 49.18 20.57 11.34 10.40 8.00 1667.89 464.25 143.18 477.28
P56 51.25 16.55 10.32 9.88 8.00 951.17 555.02 155.90 519.66
P57 47.42 18.96 16.96 11.72 8.00 841.87 646.76 153.63 512.09
P58 50.60 16.16 12.00 10.41 8.00 888.57 732.71 167.97 559.91
P59 49.82 14.82 11.86 10.34 8.00 771.76 594.39 155.07 516.91
P60 50.08 17.07 12.94 10.67 8.00 798.47 620.95 157.82 526.05
P61 50.10 17.62 12.89 10.65 8.00 868.94 647.01 160.21 534.04
P62 50.00 12.11 12.21 10.47 8.00 743.25 627.50 158.40 528.00
P63 50.00 34.31 6.19 8.53 8.00 1160.49 460.00 142.50 475.00
P64 50.40 14.87 14.11 10.97 8.00 1239.41 511.59 147.43 491.43
P65 54.51 19.07 14.55 10.96 8.00 925.06 781.15 179.32 597.72
P66 51.03 13.81 14.27 11.00 8.00 838.99 735.39 168.10 560.34
P67 50.00 13.46 14.49 11.05 8.00 681.75 718.99 165.37 551.25
P68 50.00 11.80 14.32 11.04 8.00 631.50 720.25 165.67 552.25
P69 52.02 32.72 8.67 9.38 8.00 1157.93 597.95 159.33 531.11
P70 50.47 28.57 10.51 9.94 8.00 1546.66 484.01 146.26 487.54
P71 48.82 26.58 13.02 10.37 8.00 1346.10 574.32 148.72 495.73
P72 51.56 27.08 10.41 9.90 8.00 1383.28 603.99 156.76 522.53
P73 49.80 24.79 10.14 9.83 8.00 1291.62 511.72 147.39 491.30
P74 55.55 12.42 14.80 11.14 8.00 1033.47 692.69 174.73 582.42
P75 50.93 12.28 12.08 10.31 8.00 628.99 684.50 163.87 546.22
P76 53.67 26.64 7.73 9.01 8.00 1044.48 531.63 155.54 518.48
P77 51.12 16.16 11.28 10.12 8.00 1094.02 485.92 146.70 488.99
P78 50.00 17.48 10.70 9.97 8.00 840.99 549.50 150.67 502.25
P79 50.00 21.48 10.39 9.80 8.00 973.99 527.25 148.27 494.25
P80 49.73 27.36 8.19 9.17 8.00 1214.51 462.03 141.52 471.73
P81 53.99 15.45 11.93 10.33 8.00 1155.65 543.14 157.92 526.40
P82 50.76 11.26 14.06 10.94 8.00 677.93 659.66 161.96 539.86
P83 50.00 14.64 8.28 8.97 8.00 647.50 558.50 149.32 497.75
P84 50.00 18.31 12.04 10.40 8.00 823.75 508.00 145.27 484.25
P85 50.00 19.76 11.33 10.18 8.00 951.75 584.25 154.35 514.50
P86 50.00 10.26 6.60 8.65 8.00 750.50 448.25 141.23 470.75
P87 50.00 48.84 3.08 4.23 8.00 1477.50 242.00 96.60 322.00
P88 53.02 38.53 6.21 8.53 8.00 2315.97 246.26 101.47 338.24
P89 48.64 25.16 7.49 8.88 8.00 1549.00 333.20 127.03 423.43
P90 51.77 9.68 14.94 11.18 8.00 901.75 580.55 155.76 519.21
P91 46.52 10.18 15.27 11.30 8.00 461.91 702.63 156.85 522.85
P92 44.39 9.32 15.58 11.37 8.00 432.80 684.71 150.95 503.16
P93 51.41 10.32 15.21 11.30 8.00 504.88 791.51 174.83 582.77
P94 50.59 11.04 16.39 11.58 8.00 540.26 799.26 173.61 578.70
Luas Volume
Patok jarak Galian TimbunanKupasanBronjong Galian Timbunan Kupasan Bronjong
(m) (m2) (m2) (m) (m2) (m3) (m3) (m3) (m3)
P95 50.00 11.32 15.28 11.28 8.00 559.00 791.74 171.45 571.50
P96 50.00 12.49 16.15 11.52 8.00 595.25 785.75 171.00 570.00
P97 50.00 14.18 12.33 10.39 8.00 666.75 712.00 164.33 547.75
P98 55.07 14.63 15.34 11.31 8.00 793.34 761.95 179.27 597.56
P99 50.83 14.88 15.14 11.28 8.00 750.01 774.66 172.24 574.13
P100 50.43 10.85 16.30 11.55 8.00 648.80 792.79 172.70 575.68
P101 48.43 19.62 9.57 9.72 8.00 737.90 626.50 154.53 515.10
P102 51.09 18.56 13.12 10.72 8.00 975.28 579.60 156.64 522.13
P103 50.00 18.52 12.15 10.43 8.00 926.99 631.74 158.62 528.74
P104 53.36 21.10 10.28 9.85 8.00 1056.98 598.39 162.31 541.03
P105 50.97 23.22 10.05 9.80 8.00 1129.42 518.07 150.22 500.75
P106 51.75 24.00 9.59 9.68 8.00 1221.81 508.18 151.21 504.04
P107 50.00 23.02 10.63 9.99 8.00 1175.49 505.50 147.52 491.75
P108 50.00 16.45 14.90 11.20 8.00 986.76 638.26 158.93 529.76
P109 50.00 17.59 14.20 11.01 8.00 850.99 727.49 166.57 555.25
P110 50.00 18.83 13.78 10.90 8.00 910.49 699.49 164.32 547.74
P111 49.66 19.28 13.64 10.86 8.00 946.34 680.89 162.10 540.34
P112 50.50 19.63 13.81 10.90 8.00 982.38 693.05 164.82 549.39
P113 50.00 18.28 14.36 11.05 8.00 947.84 704.32 164.64 548.80
P114 50.00 28.67 13.09 10.68 8.00 1173.74 686.25 162.97 543.25
P115 50.00 29.57 13.95 10.95 8.00 1455.99 675.99 162.22 540.74
P116 32.02 19.16 12.97 10.67 8.00 780.05 430.92 103.83 346.08
P117 55.27 20.58 13.08 10.66 8.00 1098.13 719.84 176.82 589.41
P118 50.84 20.15 12.07 10.55 8.00 1035.40 639.34 161.75 539.18
P119 47.37 21.93 13.70 10.88 8.00 996.70 610.38 152.28 507.59
P120 52.16 23.24 12.24 10.68 8.00 1177.99 676.49 168.68 562.26
P121 49.20 23.57 12.93 10.65 8.00 1151.56 619.20 157.42 524.73
P122 51.26 24.17 12.50 10.56 8.00 1223.57 651.77 163.08 543.61
P123 50.70 25.29 11.12 10.13 8.00 1253.89 598.81 157.36 524.53
P124 50.00 23.94 12.17 10.47 8.00 1230.77 582.26 154.50 515.01
P125 50.00 30.29 10.22 9.87 8.00 1355.74 559.75 152.55 508.50
P126 49.13 14.60 15.79 11.43 8.00 1102.73 638.94 156.97 523.24
P127 44.94 14.43 15.44 11.34 8.00 652.27 701.70 153.48 511.61
P128 41.68 15.59 14.61 11.15 8.00 625.59 626.22 140.60 468.67
P129 49.22 35.99 8.13 9.23 8.00 1269.32 559.60 150.46 501.53
P130 104.03 4.16 14.23 17.60 8.00 2088.39 1163.05 418.67 1395.55
P131 100.19 5.55 18.62 12.15 8.00 486.41 1645.57 447.08 1490.28
P132 50.01 4.91 18.75 12.18 8.00 261.56 934.45 182.51 608.38
P133 50.00 5.71 17.84 11.94 8.00 265.50 914.74 180.90 602.99
P134 50.00 7.01 17.62 11.90 8.00 318.00 886.51 178.80 596.01
P135 50.00 7.82 17.61 11.90 8.00 370.75 880.75 178.50 595.00
P136 50.00 27.16 10.97 10.09 8.00 874.49 714.50 164.92 549.75
P137 50.00 29.38 9.60 9.67 8.00 1413.50 514.25 148.20 494.00
P138 49.72 23.24 12.57 10.53 8.00 1308.01 551.10 150.64 502.13
P139 51.20 28.69 13.24 10.75 8.00 1329.33 660.69 163.42 544.73
P140 46.08 29.50 12.98 10.65 8.00 1340.61 604.07 147.91 493.02
P141 51.07 29.63 13.30 10.75 8.00 1509.83 671.04 163.93 546.43
P142 50.00 25.88 12.36 10.48 8.00 1387.76 641.50 159.23 530.75
P143 50.60 22.15 12.29 10.46 8.00 1215.25 623.69 158.95 529.82
P144 56.03 31.90 9.01 9.47 8.00 1514.18 596.71 167.50 558.33
P145 52.46 20.78 14.17 10.98 8.00 1381.85 608.03 160.93 536.42
Luas Volume
Patok jarak Galian TimbunanKupasanBronjong Galian Timbunan Kupasan Bronjong
(m) (m2) (m2) (m) (m2) (m3) (m3) (m3) (m3)
P146 51.17 14.68 14.32 11.02 8.00 907.16 728.85 168.84 562.82
P147 50.00 11.94 14.88 11.19 8.00 665.50 730.00 166.58 555.25
P148 50.00 13.91 14.50 11.08 8.00 646.25 734.50 167.03 556.75
P149 51.00 29.70 9.48 9.62 8.00 1112.00 611.46 158.35 527.82
P150 48.68 14.60 14.41 11.03 8.00 1078.30 581.50 150.79 502.64
P151 50.60 4.04 18.73 32.03 8.00 471.56 838.38 326.80 1089.33
P152 50.93 8.58 19.18 16.28 8.00 321.38 965.42 369.08 1230.27
P153 50.00 8.39 17.53 11.92 8.00 424.25 917.76 211.50 705.01
P154 50.00 9.94 17.08 11.79 8.00 458.25 865.25 177.82 592.75
P155 52.67 6.08 17.65 11.92 8.00 421.85 914.53 187.30 624.35
P156 51.35 21.80 11.53 10.29 8.00 715.80 749.18 171.07 570.23
P157 50.15 19.26 14.61 11.12 8.00 1029.51 655.42 161.05 536.82
P158 53.21 19.50 12.67 10.59 8.00 1031.15 725.75 173.27 577.56
P159 51.61 21.03 11.82 10.34 8.00 1045.82 631.93 162.02 540.07
P160 54.76 18.59 12.65 10.55 8.00 1084.82 670.00 171.59 571.98
P161 49.20 15.23 14.54 11.09 8.00 831.99 668.89 159.71 532.36
P162 51.63 16.93 14.34 11.04 8.00 830.17 745.50 171.38 571.26
P163 50.58 17.29 13.37 10.76 8.00 865.42 700.78 165.40 551.32
P164 50.00 17.41 13.97 10.94 8.00 867.49 683.49 162.75 542.49
P165 50.00 18.07 14.04 10.96 8.00 887.01 700.26 164.25 547.51
P166 50.00 18.92 13.78 10.83 8.00 924.74 695.49 163.42 544.75
P167 113.95 18.78 13.74 10.88 8.00 2147.94 1567.94 371.07 1236.92
P168 108.12 33.71 8.71 9.35 8.00 2837.64 1213.66 328.09 1093.64
P169 50.00 33.37 5.61 8.33 8.00 1676.98 358.00 132.60 442.00
P170 50.00 11.73 15.03 11.20 8.00 1127.50 516.00 146.47 488.25
P171 50.00 22.62 8.11 5.77 8.00 858.76 578.51 127.28 424.26
P172 50.00 11.20 16.41 11.59 8.00 845.50 613.00 130.20 434.00
P173 50.00 11.76 16.09 11.51 8.00 573.99 812.49 173.25 577.49
P174 51.41 14.16 15.08 11.24 8.00 666.21 801.15 175.42 584.74
P175 50.64 15.35 14.65 11.12 8.00 747.14 752.71 169.83 566.12
P176 50.00 14.55 15.10 11.25 8.00 747.50 743.75 167.77 559.25
P177 50.00 14.97 15.11 11.25 8.00 738.01 755.26 168.75 562.50
P178 50.00 14.60 16.28 11.53 8.00 739.24 784.74 170.85 569.50
P179 49.39 16.18 14.48 11.08 8.00 760.19 759.69 167.52 558.41
P180 49.25 16.72 14.11 10.97 8.00 810.21 704.07 162.90 543.02
P181 50.80 17.66 13.71 10.86 8.00 873.26 706.63 166.35 554.49
P182 51.45 18.32 13.83 10.90 8.00 925.52 708.42 167.92 559.74
P183 54.90 17.36 13.89 10.91 8.00 979.44 760.93 179.61 598.70
P184 50.83 18.37 13.73 10.88 8.00 908.04 701.93 166.13 553.77
P185 49.94 18.63 13.73 10.87 8.00 923.97 685.74 162.94 543.14
P186 49.93 18.02 13.59 10.84 8.00 915.05 682.10 162.61 542.04
P187 50.07 18.64 12.66 10.57 8.00 917.81 657.19 160.80 536.01
P188 50.23 20.29 13.04 10.68 8.00 977.63 645.39 160.09 533.64
P189 49.88 20.88 11.96 10.36 8.00 1026.81 623.52 157.43 524.75
P190 49.71 36.92 6.91 8.78 8.00 1436.53 468.98 142.71 475.69
P191 55.17 27.92 4.34 4.64 8.00 1788.52 310.32 111.05 370.17
JUMLAH 9677.48 197122.24 120603.48 32221.70 107405.67
VOLUME GROUNDSILL SUNGAI BIRU

Pekerjaan : Detail Desain Pengendalian Banjir Sungai Di Kabupaten Yahukimo


Lokasi : Kabupaten Yahukimo

Luas
Patok Section PJG Galian Timbunan Bronjong Pasangan
(m) (m2) (m2) (m2) Batu

P2 Abutmen 18.10 3.10 4.170


Groundsill 29.00 0.96 4.446
P15 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P16 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P21 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P25 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P26 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P27 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P32 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P44 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P48 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P54 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P63 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P69 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P70 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P72 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P73 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P125 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P129 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P130 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P136 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P137 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P144 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P149 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P156 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P157 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
P168 Abutmen 18.10 3.10 4.170
Groundsill 29.00 0.96 4.446
Jumlah
UNGAI BIRU

Volume
Galian Timbunan Bronjong Pasangan Batu Plesteran
(m3) (m3) (m3) (m3) (m2)

28.02 0.00 0.00 37.74 91.80


13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
28.02 0.00 0.00 37.74 91.80
13.87 0.00 0.00 64.46 196.44
1089.16 0.00 0.00 2657.24 7494.40
VOLUME KRIB SUNGAI BIRU

Pekerjaan : Detail Desain Pengendalian Banjir Sungai Di Kabupaten Yahukimo


Lokasi : Kabupaten Yahukimo

Volume
Section Galian Timbunan Bronjong Pasangan Batu
(m3) (m3) (m3) (m3)

P115 152.18 0.00 217.40


P138-P142 272.77 0.00 389.68
Jumlah 424.95 0.00 607.08 0.00
VOLUME TANGGUL DAN NORMALISASI SUNGAI BIRU

Pekerjaan : Detail Desain Pengendalian Banjir Sungai Di Kabupaten Yahukimo


Lokasi : Kabupaten Yahukimo

Luas Volume
Patok jarak Galian Timbunan Kupasan Bronjong Galian Timbunan Kupasan
(m) (m2) (m2) (m) (m2) (m3) (m3) (m3)

A9 0.00 12.79 2.41 4.36 7.00


A10 49.51 7.20 6.75 9.54 7.00 494.87 226.76 103.23
A11 50.37 5.62 9.01 10.89 322.87 396.92 154.36
A12 49.63 9.67 3.57 4.68 379.42 312.17 115.91
A13 50.37 6.01 6.49 9.82 394.89 253.36 109.55
A14 52.66 6.03 6.54 1.08 316.99 343.05 86.09
A15 51.08 6.68 3.51 10.12 324.62 256.68 85.82
A16 49.98 6.37 4.26 9.62 326.13 194.18 148.00
A17 50.49 9.54 3.71 9.26 401.66 201.21 142.99
A18 54.49 2.86 7.35 10.61 337.84 301.33 162.41
A19 51.30 6.23 6.59 10.80 233.18 357.59 164.76
A20 23.99 6.28 5.07 9.80 150.07 139.88 74.14
A21 21.24 2.37 7.41 10.82 91.86 132.53 65.69
A22 19.23 6.11 6.44 10.62 81.55 133.19 61.85
A23 24.39 2.59 7.82 10.82 106.09 173.88 78.43
A24 54.92 3.41 5.64 10.12 164.77 369.64 172.52
A25 50.18 5.97 8.08 10.99 235.33 344.22 158.89
A26 21.25 2.90 6.82 10.54 94.23 158.28 68.61
A27 22.81 1.30 1.24 12.16 47.89 91.91 77.66
A28 30.99 2.17 8.48 11.14 53.77 150.62 108.32
A29 51.00 5.33 3.66 9.08 191.24 309.55 154.68
A30 51.25 4.25 4.51 10.17 245.50 209.37 147.99
A31 29.70 12.73 4.59 9.73 252.12 135.12 88.64
A32 29.12 6.17 5.40 10.53 275.21 145.47 88.50
A33 49.92 3.50 5.41 10.20 241.36 269.82 155.23
A34 19.82 10.39 1.94 13.48 137.65 72.84 70.40
A35 23.34 4.99 4.04 9.65 179.48 69.78 80.98
A36 25.56 2.06 8.64 11.63 90.11 162.07 81.60
A37 35.77 11.81 6.66 10.94 248.10 273.68 121.11
A38 34.29 2.73 6.65 10.76 249.29 228.20 111.62
A39a 23.32 5.19 3.85 9.25 92.36 122.44 70.00
A39b 22.40 5.63 1.34 12.39 121.18 58.13 72.71
A40 23.27 5.71 9.00 11.62 131.92 120.29 83.79
A41 47.84 3.48 5.39 10.04 219.84 344.24 155.45
A42 25.29 2.52 10.86 11.42 75.88 205.50 81.41
A43 28.65 8.83 2.53 7.85 162.59 191.81 82.81
A44 24.32 10.34 1.51 0.20 233.06 49.12 29.36
A45 50.47 6.85 1.91 6.85 433.77 86.30 53.37
A46 50.88 3.26 5.77 10.44 257.20 195.38 131.96
A47 50.61 1.76 10.64 10.81 127.03 415.26 161.32
A48 50.59 6.57 4.93 6.77 210.73 393.88 133.42
A49 26.79 0.53 14.84 12.54 95.09 264.78 77.59
A50 18.42 10.65 17.93 13.17 102.94 301.74 71.02
A51 17.43 10.18 23.88 13.90 181.50 364.32 70.76
Luas Volume
Patok jarak Galian Timbunan Kupasan Bronjong Galian Timbunan Kupasan
(m) (m2) (m2) (m) (m2) (m3) (m3) (m3)
A52 24.53 5.59 11.48 12.19 193.39 433.64 95.99
A53 25.44 5.84 9.93 11.38 145.37 272.29 89.93
A54 29.98 2.23 8.59 10.91 120.98 277.64 100.25
A55 30.66 13.36 18.92 13.36 238.98 421.69 111.61
A56 20.95 11.74 7.16 11.05 262.95 273.22 76.72
A57 20.49 5.34 2.89 14.79 174.97 102.95 79.41
A58 53.61 1.04 14.80 12.85 171.03 474.21 222.28
A59 50.64 0.88 17.66 12.41 48.61 821.88 191.87
A60 50.96 0.76 19.79 12.91 41.79 954.31 193.56
A61 53.37 5.56 10.88 11.82 168.64 818.37 197.96
A62 56.00 8.65 2.50 7.50 397.89 374.65 162.29
A63 52.69 1.40 12.77 10.42 264.76 402.27 141.63
A64 25.93 1.86 9.68 10.54 42.27 291.11 81.54
A65 33.27 1.01 19.14 13.41 47.74 479.44 119.53
A66 50.69 4.17 4.70 10.05 131.28 604.21 178.37
A67 50.27 3.04 6.27 10.34 181.22 275.73 153.75
A68 46.79 6.15 13.85 9.41 215.00 470.70 138.61
A69 21.21 10.38 18.91 13.01 175.31 347.43 71.33
A70 20.82 1.33 12.17 12.07 121.88 323.50 78.31
A71 49.34 2.35 8.62 9.77 90.78 512.86 161.63
A72 50.47 1.15 14.99 11.66 88.32 595.78 162.23
A73 51.49 3.68 5.16 10.43 124.35 518.76 170.61
A74 47.53 4.96 4.02 9.61 205.33 218.16 142.87
A75 49.46 0.37 8.55 14.73 131.80 310.83 180.56
A76 50.50 0.69 8.43 11.87 26.76 428.72 201.48
A77 50.71 1.12 5.33 11.23 45.89 348.88 175.71
A78 50.69 1.96 3.33 10.24 78.06 219.49 163.25
A79 54.51 1.40 8.72 12.48 91.58 328.43 185.77
A80 50.47 3.35 3.26 9.31 119.88 302.34 164.97
A81 49.25 4.37 6.50 10.20 190.12 240.36 144.14
A82 47.00 6.77 5.16 12.18 261.77 273.99 157.77
A83 47.67 0.94 4.06 12.14 183.75 219.74 173.89
A84 49.42 2.74 6.64 10.31 90.93 264.40 166.42
A85 27.64 1.17 8.11 11.11 54.04 203.86 88.82
A86 29.70 2.52 7.31 11.34 54.79 228.96 100.00
A87 30.35 12.72 6.94 1.08 231.27 216.24 56.54
A88 56.32 1.57 9.48 10.84 402.37 462.35 100.69
A89 52.13 3.37 5.75 10.19 128.77 396.99 164.45
A90 24.85 3.09 6.03 10.64 80.28 146.39 77.66
A91 23.75 9.30 3.20 15.39 147.15 109.62 92.74
A92 48.48 0.70 2.98 13.54 242.39 149.79 210.37
A93 48.58 5.52 4.82 12.15 151.10 189.48 187.22
A94 47.19 6.06 6.37 10.60 273.23 264.03 161.04
A95 21.81 1.91 9.59 11.46 86.90 174.01 72.16
A96 49.72 0.70 3.71 13.73 64.88 330.62 187.86
A97 48.82 3.79 6.02 9.27 109.61 237.52 168.44
A98 22.91 4.27 9.30 21.07 92.32 175.47 104.25
A99 22.94 1.02 4.00 10.63 60.66 152.52 109.06
A100 48.42 5.24 12.68 12.09 151.55 403.82 165.01
A101 49.62 7.23 5.28 7.20 309.37 445.58 143.57
A102 26.84 18.35 0.00 0.19 343.32 70.87 29.76
Luas Volume
Patok jarak Galian Timbunan Kupasan Bronjong Galian Timbunan Kupasan
(m) (m2) (m2) (m) (m2) (m3) (m3) (m3)
A103 27.08 17.10 0.00 0.19 479.94 0.00 1.54
A104 54.67 17.35 0.00 0.19 941.68 0.00 3.12
A105 54.89 6.05 3.35 8.98 642.21 91.94 75.50
A106 54.01 1.35 12.70 11.68 199.85 433.46 167.39
A107 18.37 12.20 7.77 11.02 124.44 187.99 62.54
A108 19.58 8.86 2.34 7.55 206.22 99.00 54.55
A109 50.96 2.72 6.65 11.23 295.06 229.07 143.56
A110 53.30 2.71 6.80 10.78 144.72 358.47 175.98
A111 53.91 3.88 8.59 10.57 177.64 414.86 172.66
A112 49.94 1.00 15.27 12.66 121.86 595.79 174.02
A113 47.74 5.12 17.92 13.34 146.10 792.32 186.20
A114 47.58 3.37 5.64 10.56 201.96 560.43 170.56
A115 52.43 12.27 7.25 11.23 409.99 337.90 171.36
A116 53.86 4.15 4.58 10.16 442.22 318.60 172.82
A117 52.91 2.49 7.21 11.06 175.65 311.88 168.40
A118 53.92 3.25 5.80 10.53 154.76 350.77 174.63
A119 51.28 4.39 4.54 9.97 195.90 265.13 157.70
A120 50.04 0.57 22.83 13.27 124.11 684.84 174.45
A121 50.04 11.83 8.87 1.95 310.27 793.20 114.25
A122 50.01 1.75 9.76 11.80 339.56 465.83 103.14
A123 48.23 5.96 9.74 12.60 185.94 470.27 176.53
A124 50.00 1.95 9.03 11.34 197.74 469.22 179.54
A125 50.01 0.77 9.62 13.47 68.01 466.31 186.10
A126 50.00 5.10 6.52 12.48 146.74 403.49 194.62
A127 50.00 2.06 7.28 11.63 178.99 344.99 180.82
A128 50.00 0.66 2.16 13.66 68.00 235.99 189.67

JUMLAH 4930.56 23650.11 36768.33 15302.47


olume
Bronjong
(m3)

103.97
52.89
olume
Bronjong
(m3)
olume
Bronjong
(m3)

156.86
VOLUME BANGUNAN REGULATOR SUNGAI BONTO ALTERNATIF I (PASANGAN BATU
Detail Desain Pengendalian Banjir Sungai Di Kabupaten Yahukimo
Pekerjaan : Kabupaten Yahukimo
Lokasi :

Volume
Section Galian Timbunan Bronjong Pasangan Batu Plasteran
(m3) (m3) (m3) (m3) (m3)

Tanggul Kiri 2379.68 0.00 2379.68 0.00 0.00


Tanggul Kanan 2257.72 0.00 2257.72 0.00 0.00
Abutmen Kiri 60.83 0.00 0.00 86.80 66.88
Abutmen Kanan 55.57 240.69 0.00 100.07 76.84
Regulator 330.44 0.00 45.00 315.45 0.00
Rib Rab 233.04 0.00 610.05 16.49 0.00
Apron 121.02 0.00 0.00 158.99 180.80
Jumlah 5438.31 240.69 5292.45 677.79 324.52

VOLUME BANGUNAN REGULATOR SUNGAI BONTO ALTERNATIF II (BROJONG)

Pekerjaan : Detail Desain Pengendalian Banjir Sungai Di Kabupaten Yahukimo


Lokasi : Kabupaten Yahukimo

Volume
Section Galian Timbunan Bronjong Pasangan Batu Plasteran
(m3) (m3) (m3) (m3) (m3)

Tanggul Kiri 2379.68 0.00 2379.68 0.00 0.00


Tanggul Kanan 2257.72 0.00 2257.72 0.00 0.00
Abutmen Kiri 60.83 0.00 0.00 86.80 66.88
Abutmen Kanan 55.57 240.69 0.00 100.07 76.84
Regulator 267.05 0.00 247.50 44.10 0.00
Rib Rab 233.04 0.00 610.05 16.49 0.00
Apron 99.70 0.00 146.90 0.00 0.00
Jumlah 5353.59 240.69 5641.85 247.45 143.72
ERNATIF I (PASANGAN BATU)
en Yahukimo

Beton Bertulang
(m3)

0.00
0.00
0.00
0.00
60.35
0.00
0.00
60.35

ERNATIF II (BROJONG)

en Yahukimo

Beton Bertulang
(m3)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VOLUME PEKERJAAN

Daerah : SUNGAI BONTO


Bangunan : REGULATOR ARUS SUNGAI
Sketsa Volume

Pasangan Batu kali


1.00 1.00 3.25 2.25 5.00 n x Area*) x L
Tanggul Kanan = 1x 14.030 x 16 218.87 m3
0.75 1.17 0.75 1.25

+89.00

Tanggul kiri = 1x 14.030 x 18.42 258.50 m3


0.50
+88.55

0.50
+88.00

1.00
1
0.50
Bagian Tengah = 1x 62.962 x 15.00 944.44 m4
1
1 1.00 1.00 1
+87.00

0.80 1.00 +86.50


+86.20 0.30
1.00

Total :
0.50
1.00 0.30

0.30 1.50 1.00 2.00 2.00 4.75 0.25 0.50


Pasangan Batu kali 1421.81 m3
Galian 1137.45 m3
Timbunan 379.15 m3

Catatan :
n = jumlah
Area*) = Luas Area Potongan pada CAD
Lebar*) = Lebar Potongan pada CAD
L = Panjang bangunan
VOLUME PEKERJAAN

Daerah : SUNGAI BIRU


Bangunan : GROUNDSILL
Sketsa Volume

Pasangan Batu kali


n x Area*) x L
Abutmen = 2x 4.170 x 18.10 150.95 m3
Groundsill = 1x 4.446 x 29.00 128.93 m3
= 1x 2.000 x 30.00 60.00 m3
Galian = 1x 34.442 x 5.50 189.43 m3
= 2x 2.723 x 13.00 70.79 m3

Total :
Pasangan Batu kali 339.88 m3
Galian 260.22 m3

Catatan :
n = jumlah
Area*) = Luas Area Potongan pada CAD
Lebar*) = Lebar Potongan pada CAD
L = Panjang bangunan
VOLUME PEKERJAAN

Daerah : SUNGAI BIRU


Bangunan : TANGGUL SUNGAI
Sketsa Volume

Bronjong
n x Area*) x L
Tanggul kanan = 1x 4.000 x 9614.98 38459.90 m3
Tanggul kiri = 1x 4.000 x 9614.98 38459.90 m3

Galian
n x Area*) x L
Tanggul kanan = 1x 15.000 x 9614.98 144224.64 m2
Tanggul kiri = 1x 15.000 x 9614.98 144224.64 m2

Total :
Bronjong 76919.81 m3
Galian 288449.28 m2

Catatan :
n = jumlah
Area*) = Luas Area Potongan pada CAD
Lebar*) = Lebar Potongan pada CAD
L = Panjang bangunan
VOLUME PEKERJAAN

Daerah : SUNGAI BIRU


Bangunan : KRIB
Sketsa Volume

Bronjong
n x Area*) x L
Krib = 20 x 10.000 x 5.50 1100.00 m3

Galian
n x Area*) x L
Krib = 20 x 18.500 x 5.50 2035.00 m3

Total :
Bronjong 1100.00 m3
Galian 2035.00 m3

Catatan :
n = jumlah
Area*) = Luas Area Potongan pada CAD
Lebar*) = Lebar Potongan pada CAD
L = Panjang bangunan
JADWAL PELAKSANAAN PEKERJAAN
ALTERNATIF I
PEKERJAAN : DETAIL DESAIN PENGENDALIAN BANJIR SUNGAI DI KABUPATEN YAHUKIMO
LOKASI : KABUPATEN YAHUKIMO

NO URAIAN VOLUME

1 PEKERJAAN PERSIAPAN
a Pembersihan Lokasi 1 Ls
b Direksi Ket 1 Ls
c Barak Kerja 1 Ls
d Pengukuran, Pemasangan Profil dan Bouwplank 1 Ls
e Mobilisasi dan Demobilisasi 1 Ls
f Papan Nama Proyek 1 Ls

3 BANGUNAN DAN NORMALISASI SUNGAI BIRU (BM1 - P44)


a Galian Tanah Menggunakan Alat Berat 55,112 m3
b Tanah Ditimbun Dipadatkan 25,222 m3
c Pasangan Batu Kali 1 : 4 920 m3
d Bronjong 26,123 m3
e Plasteran 1 : 3 2,594 m2

4 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P44 - P90)


a Galian Tanah Menggunakan Alat Berat 60,246 m3
b Tanah Ditimbun Dipadatkan 23,659 m3
c Pasangan Batu Kali 1 : 4 715 m3
d Bronjong 22,494 m3
e Plasteran 1 : 3 2,018 m2

5 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P90 - P130)


a Galian Tanah Menggunakan Alat Berat 45,395 m3
b Tanah Ditimbun Dipadatkan 26,849 m3
c Pasangan Batu Kali 1 : 4 307 m3
d Bronjong 22,362 m3
e Plasteran 1 : 3 865 m2

6 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P130 - P156)


a Galian Tanah Menggunakan Alat Berat 27,690 m3
b Tanah Ditimbun Dipadatkan 20,084 m3
c Pasangan Batu Kali 1 : 4 511 m3
d Bronjong 17,085 m3
e Plasteran 1 : 3 1,441 m2

7 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P156 - P168)


a Galian Tanah Menggunakan Alat Berat 16,821 m3
b Tanah Ditimbun Dipadatkan 9,659 m3
c Pasangan Batu Kali 1 : 4 204 m3
d Bronjong 7,847 m3
e Plasteran 1 : 3 576 m2

8 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P168 - P191)


a Galian Tanah Menggunakan Alat Berat 25,594 m3
b Tanah Ditimbun Dipadatkan 15,131 m3
c Pasangan Batu Kali 1 : 4 0 m3
d Bronjong 12,102 m3

9 REGULATOR SUNGAI BONTO ALTERNATIF I


a Galian Tanah Menggunakan Alat Berat 5,438 m3
b Tanah Ditimbun Dipadatkan 241 m3
c Pasangan Batu Kali 1 : 4 678 m3
d Bronjong 5,292 m3
e Plasteran 1 : 3 325 m2
f Beton Bertulang K 225 60 m3
10 BANGUNAN DAN NORMALISASI SUNGAI BONTO
a Galian Tanah Menggunakan Alat Berat 38,953 m3
b Tanah Ditimbun Dipadatkan 36,768 m3
c Bronjong 157 m3
ATEN YAHUKIMO

WAKTU
PELAKSANAAN TAHUN PERTAMA
(HARI) JAN PEB MAR APR MEI JUN JUL AGS SEPT OKT NOP DES

1.00
2.00

83
96

91
90

69
102

42
77

26
37

39
58

9
1

59
140
TAHUN KE DUA TAHUN
JAN PEB MAR APR MEI JUN JUL AGS SEPT OKT NOP DES JAN PEB MAR APR
TAHUN KE TIGA TAHUN KE EMPAT
MEI JUN JUL AGS SEPT OKT NOP DES JAN PEB MAR APR MEI JUN JUL AGS
EMPAT
SEPT OKT NOP DES
JADWAL PELAKSANAAN PEKERJAAN
ALTERNATIF II
PEKERJAAN : DETAIL DESAIN PENGENDALIAN BANJIR SUNGAI DI KABUPATEN YAHUKIMO
LOKASI : KABUPATEN YAHUKIMO

NO URAIAN VOLUME

1 PEKERJAAN PERSIAPAN
a Pembersihan Lokasi 1 Ls
b Direksi Ket 1 Ls
c Barak Kerja 1 Ls
d Pengukuran, Pemasangan Profil dan Bouwplank 1 Ls
e Mobilisasi dan Demobilisasi 1 Ls
f Papan Nama Proyek 1 Ls

3 BANGUNAN DAN NORMALISASI SUNGAI BIRU (BM1 - P44)


a Galian Tanah Menggunakan Alat Berat 55,112 m3
b Tanah Ditimbun Dipadatkan 25,222 m3
c Pasangan Batu Kali 1 : 4 920 m3
d Bronjong 26,123 m3
e Plasteran 1 : 3 2,594 m2

4 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P44 - P90)


a Galian Tanah Menggunakan Alat Berat 60,246 m3
b Tanah Ditimbun Dipadatkan 23,659 m3
c Pasangan Batu Kali 1 : 4 715 m3
d Bronjong 22,494 m3
e Plasteran 1 : 3 2,018 m2

5 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P90 - P130)


a Galian Tanah Menggunakan Alat Berat 45,395 m3
b Tanah Ditimbun Dipadatkan 26,849 m3
c Pasangan Batu Kali 1 : 4 307 m3
d Bronjong 22,362 m3
e Plasteran 1 : 3 865 m2

6 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P130 - P156)


a Galian Tanah Menggunakan Alat Berat 27,690 m3
b Tanah Ditimbun Dipadatkan 20,084 m3
c Pasangan Batu Kali 1 : 4 511 m3
d Bronjong 17,085 m3
e Plasteran 1 : 3 1,441 m2

7 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P156 - P168)


a Galian Tanah Menggunakan Alat Berat 16,821 m3
b Tanah Ditimbun Dipadatkan 9,659 m3
c Pasangan Batu Kali 1 : 4 204 m3
d Bronjong 7,847 m3
e Plasteran 1 : 3 576 m2

8 BANGUNAN DAN NORMALISASI SUNGAI BIRU (P168 - P191)


a Galian Tanah Menggunakan Alat Berat 25,594 m3
b Tanah Ditimbun Dipadatkan 15,131 m3
c Pasangan Batu Kali 1 : 4 0 m3
d Bronjong 12,102 m3

9 REGULATOR SUNGAI BONTO ALTERNATIF II


a Galian Tanah Menggunakan Alat Berat 5,354 m3
b Tanah Ditimbun Dipadatkan 241 m3
c Pasangan Batu Kali 1 : 4 247 m3
d Bronjong 5,642 m3
e Plasteran 1 : 3 144 m2
f Beton Bertulang K 225 0 m3
10 BANGUNAN DAN NORMALISASI SUNGAI BONTO
a Galian Tanah Menggunakan Alat Berat 38,953 m3
b Tanah Ditimbun Dipadatkan 36,768 m3
c Bronjong 157 m3
ATEN YAHUKIMO

WAKTU
PELAKSANAAN TAHUN PERTAMA
(HARI) JAN PEB MAR APR MEI JUN JUL AGS SEPT OKT NOP DES

1.00
2.00

83
96

91
90

69
102

42
77

26
37

39
58

9
1

59
140
TAHUN KE DUA TAHUN
JAN PEB MAR APR MEI JUN JUL AGS SEPT OKT NOP DES JAN PEB MAR APR
TAHUN KE TIGA TAHUN KE EMPAT
MEI JUN JUL AGS SEPT OKT NOP DES JAN PEB MAR APR MEI JUN JUL AGS
EMPAT
SEPT OKT NOP DES

Anda mungkin juga menyukai