DAFTAR HARGA UPAH PEKERJA

TAHUN ANGGARAN 2015

NO. JENIS PEKERJA UPAH (Rp.) SATUAN KETERANGAN

1 2 3 4 5

1 PEKERJA 60,000.00 Orang / Hari / 8 Jam

2 PEMBANTU TUKANG 62,000.00 Orang / Hari / 8 Jam

3 TUKANG KAYU 65,000.00 Orang / Hari / 8 Jam

4 TUKANG BATU 65,000.00 Orang / Hari / 8 Jam

5 TUKANG BESI 65,000.00 Orang / Hari / 8 Jam

6 TUKANG CAT 65,000.00 Orang / Hari / 8 Jam

7 TUKANG LAS 65,000.00 Orang / Hari / 8 Jam

8 TUKANG BESI KONSTRUKSI 65,000.00 Orang / Hari / 8 Jam

9 KEPALA TUKANG 70,000.00 Orang / Hari / 8 Jam

10 MANDOR 80,000.00 Orang / Hari / 8 Jam

11 OPERATOR TERLATIH 70,000.00 Orang / Hari / 8 Jam

12 OPERATOR KURANG TERLATIH 62,000.00 Orang / Hari / 8 Jam

13 PEMBANTU OPERATOR 55,000.00 Orang / Hari / 8 Jam

14 JURU UKUR 66,000.00 Orang / Hari / 8 Jam

15 ASISTEN JURU UKUR 51,000.00 Orang / Hari / 8 Jam

16 SUPIR TERLATIH 66,000.00 Orang / Hari / 8 Jam

DAFTAR UPAH Halaman 1


NO. JENIS PEKERJA UPAH (Rp.) SATUAN KETERANGAN

1 2 3 4 5

17 PEMBANTU SUPIR 51,000.00 Orang / Hari / 8 Jam

18 BURUH LAPANGAN TERLATIH 46,000.00 Orang / Hari / 8 Jam

19 BURUH LAPANGAN TAK TERLATIH 40,000.00 Orang / Hari / 8 Jam

20 ASISTEN PEMATUNG 264,000.00 Orang / Hari / 8 Jam

21 ART. DESIGNER 407,000.00 Orang / Hari / 8 Jam

PT REKA CIPTA BINA SEMESTA

HERI MUSTIKA, ST

DAFTAR UPAH Halaman 2


DAFTAR HARGA BAHAN BANGUNAN
TAHUN ANGGARAN 2015

NO. JENIS BAHAN / MATERIAL SATUAN HARGA (Rp.) KETERANGAN

1 2 3 4 5

A. BAHAN AGREGAT, BAHAN PELEKAT


BAHAN JADINYA
1 Pasir Urug / Timbun M3 130,000.00
2 Pasir Pasang M3 250,000.00
3 Pasir Beton M3 270,000.00
4 Kerikil/Koral Beton M3 240,000.00
5 Batu Pecah 0.5 - 1 M3 270,000.00
6 Batu Pecah 1 - 2 M3 250,000.00
7 Batu Pecah 2 - 3 M3 250,000.00
8 Batu Pecah 5 - 7 M3 230,000.00
9 Batu Pecah bergradasi Kelas A M3 240,000.00
10 Sirtu M3 168,800.00
11 Batu belah (Pondasi) M3 197,700.00
12 Ready Mix dengan Additive K.175 M3 870,500.00
13 Ready Mix dengan Additive K.225 M3 918,500.00
14 Ready Mix dengan Additive K.250 M3 959,600.00
15 Ready Mix dengan Additive K.300 M3 1,001,000.00
16 Ready Mix dengan Additive K.350 M3 1,056,000.00
17 Ready Mix dengan Additive K.400 M3 1,124,200.00
18 Tanah Lokal M3 25,700.00
19 Tanah Merah M3 73,200.00
20 Bata merah bakar klas I Bh 550.00
21 Batu tempel hitam Uk. 10 x 20 M2 147,400.00
22 Batu tempel hijau Uk. 10x20 dan 10x10 M2 90,200.00
23 Batu tempel kuning M2 90,200.00
24 Lem kayu (Lem Fox) Kg 21,300.00
25 Lem kuning (Aibon) Kg 52,500.00
26 Semen portland (PC 50 Kg/Zak) Kg 1,500.00
27 Semen warna Kg 14,500.00
28 Semen putih Kg 3,800.00
29 Semen Adhesive Kg 6,200.00
30 Perekat / Lem vinyl Kg 64,900.00
31 Roster Kerawang Bh 3,300.00
32 Conblock Bh 6,800.00
33 Kapur padam M3 110,000.00

DAFTAR HARGA BAHAN BANGUNAN Halaman.3


NO. JENIS BAHAN / MATERIAL SATUAN HARGA (Rp.) KETERANGAN

1 2 3 4 5

B. BAHAN KAYU BERIKUT BAHAN JADINYA


1 Bambu d. 8 s/d 10 cm / 6 M' Btg 24,300.00
2 Bambu d. 6 cm / 6 M' Btg 22,000.00
3 Bilik bambu tanpa kulit M2 17,600.00
4 Tali ijuk Kg 27,500.00
5 Ijuk Kg 34,100.00
6 Kayu terentang M3 1,744,600.00
7 Papan terentang M3 1,870,000.00
8 Kayu Jati Jabar, balok M3 14,333,000.00
9 Kayu Jati Jabar, papan M3 15,579,300.00
10 Kayu Kamper, Balok M3 9,201,500.00
11 Kayu Kamper, Papan M3 10,157,400.00
12 Kayu Borneo, Balok M3 4,752,000.00
13 Kayu Borneo, Papan M3 5,359,200.00
14 Kayu Kruing, Balok M3 6,317,300.00
15 Kayu Kruing, Papan M3 7,264,400.00
16 Kayu Cin balok M3 4,907,100.00
17 Kayu Cin papan M3 5,981,800.00
18 Kayu Bengkirai/Balau balok M3 9,172,900.00
19 Kayu Bengkirai/Balau papan M3 10,142,000.00
20 Kayu Kaso 4/6 dan 5/7 Borneo M3 3,746,600.00
21 Kayu Kaso 4/6 dan 5/7 Kruing M3 4,727,800.00
22 Kayu Reng 2/3 dan 3/4 Borneo M3 4,112,900.00
23 Kayu Reng 2/3 dan 3/4 Kruing M3 4,752,000.00
24 List Kayu Profil M' 4,200.00
25 Dolken Kayu d. 5 cm Btg 9,700.00
26 Dolken Kayu d. 8 cm Btg 42,500.00
27 Dolken Kayu d. 10 cm Btg 55,700.00
28 Plywood t. 18 mm 120 x 240 Lbr. 295,900.00
29 Teakwood 4 mm Lbr. 135,300.00
30 Formika ukuran pintu Lbr. 93,500.00
31 Multiplek 9 mm (120 x 240) Lbr. 147,400.00
32 Multiplek 12 mm (120 x 240) Lbr. 201,300.00
31 Triplek 6 mm (120 x 240) Lbr. 106,700.00
32 Triplek 3 mm (120 x 240) Lbr. 68,200.00
33 Lambersering Lbr. 193,600.00

C. BAHAN LOGAM DAN BAHAN JADINYA


1 Baja Konstruksi IWF DN Kg 11,300.00
2 Besi Profil Kg 11,500.00
3 Besi polos d.6 mm - 12 mtr ( 2,644 Kg ) Btg 38,500.00
4 Besi polos d.8 mm - 12 mtr ( 4,716 Kg ) Btg 36,300.00
5 Besi polos d.10 mm - 12 mtr ( 7,440 Kg ) Btg 67,100.00
6 Besi polos d.12 mm - 12 mtr (10,644 Kg ) Btg 125,400.00
7 Besi polos d.16 mm - 12 mtr (18,960 Kg ) Btg 158,400.00

DAFTAR HARGA BAHAN BANGUNAN Halaman.4


NO. JENIS BAHAN / MATERIAL SATUAN HARGA (Rp.) KETERANGAN

1 2 3 4 5
8 Besi beton BJTD 24 (polos) Kg 11,600.00
9 Besi beton BJTD 39 (ulir) Kg 11,600.00
10 Besi strip/plat besi d. 3-4 mm Kg 11,500.00
11 Plat alumunium (90 x 200) cm Lbr 98,400.00
12 Besi tempa untuk teralis M2 935,000.00
13 Plat Alucubon / Panel Composed M2 305,800.00
14 Besi Hollo 50,50,2 Kg 11,600.00
15 Kawat beton Kg 20,000.00
16 Kawat harmonika M2 20,500.00
17 Kawat nyamuk (Ram nyamuk hijau) M2 8,800.00
18 Kawat Duri Kg 8,600.00
19 Paku sekrup Bh 160.00
20 Paku triplek Kg 23,600.00
21 Paku asbes Kg 26,000.00
22 Paku pancing Bh 1,100.00
23 Paku Payung Asbes Bh 1,500.00
24 Paku biasa 2"-5" Kg 17,600.00
25 Paku biasa 1/2"- 1" Kg 22,000.00
26 Paku gypsum Kg 28,600.00
27 Paku beton (2 cm s/d 12 cm) Kg 31,400.00
28 Baud D.19 mm Bh 24,900.00
29 Kawat las listrik Kg 32,500.00
30 Daun Pintu Alumunium putih lengkap tanpa kaca Unit 1,433,300.00
31 Daun Pintu Alumunium coklat lengkap tanpa kaca Unit 1,651,100.00
32 Kusen Alumunium Standar Natural 4" M' 124,300.00
33 Kusen Alumunium Standar Natural 3" M' 93,500.00
34 Kusen Alumunium Warna Doffl 4" M' 143,000.00
35 Kusen Alumunium Warna Doffl 3" M' 108,900.00
36 Daun Jendela Alumunium Putih lengkap tanpa kaca Unit 311,300.00
37 Daun Jendela Alumunium Coklat lengkap tanpa kaca Unit 361,900.00
38 Polycarbonat Sheet / Twin Lite Uk. 11,8 x 2,1 Lbr 1,620,300.00
39 Polycarbonat + rangka besi M2 436,700.00
40 Polycarbonat + rangka stainless steel M2 748,000.00
41 Folding Gate (pintu lipat) M2 635,800.00
42 Fibre Glass (Acyrlie) Tebal 5 mm Lbr 1,059,300.00
43 Rolling Door M2 467,500.00
44 Pintu Handerson M2 1,683,000.00
45 Besi BRC Ulir T=90 Cm, P=240 Cm Lbr 222,200.00
46 Kuda-kuda Baja Ringan Zincallum M2 193,600.00
47 Wiremesh d. 4 mm ( uk. 2,40m x 5,20m ) Lbr 305,800.00
48 Wiremesh d. 6 mm ( uk. 2,40m x 5,20m ) Lbr 467,500.00
49 Wiremesh d. 8 mm ( uk. 2,40m x 5,20m ) Lbr 586,300.00

DAFTAR HARGA BAHAN BANGUNAN Halaman.5


NO. JENIS BAHAN / MATERIAL SATUAN HARGA (Rp.) KETERANGAN

1 2 3 4 5
D. BAHAN PERPIPAAN, RIOLERING & SANITARY
1 Closet jongkok standar putih porselen setara INA Bh 137,500.00
2 Closet duduk setara INA Lengkap Unit 1,122,000.00
3 Closet jongkok standar putih porselen setara TOTO Bh 225,500.00
4 Closet duduk setara TOTO Lengkap Unit 1,905,200.00
5 Urinoire setara TOTO Lengkap Unit 1,309,000.00
6 Washtafel warna setara TOTO Unit 446,600.00
7 Washtafel warna setara INA Unit 205,700.00
8 Shower merk Speed / DIVA Bh 96,800.00
9 Tempat sabun putih Bh 46,700.00
10 Bak mandi fibre glass standar Bh 312,400.00
11 Badtube Bh 1,870,000.00
12 Pipa GIP medium B. d. 1/2" (P. 6 m / btg.) M' 16,000.00
13 Pipa GIP medium B. d. 3/4" (P. 6 m / btg.) M' 24,200.00
14 Pipa GIP medium B. d. 1" (P. 6 m / btg.) M' 30,800.00
15 Pipa GIP medium B. d. 1 1/4" (P. 6 m / btg.) M' 38,500.00
16 Pipa GIP medium B. d. 1 1/2" (P. 6 m / btg.) M' 44,800.00
17 Pipa GIP medium B. d. 2" (P. 6 m / btg.) M' 79,900.00
18 Pipa PVC 1/2" AW M' 4,400.00
19 Pipa PVC 3/4" AW M' 5,700.00
20 Pipa PVC 1" AW M' 9,300.00
21 Pipa PVC 1 1/4" AW M' 13,200.00
22 Pipa PVC 1 1/2" AW M' 15,600.00
23 Pipa PVC 3" AW M' 26,100.00
24 Pipa PVC 4" AW M' 61,000.00
25 Pipa PVC 6" AW M' 77,200.00
26 Bak cuci steenlles steel Bh 264,000.00
27 Water drain (Roof drain) Bh 74,800.00
28 Kran air Kw.2 Bh 22,500.00
29 Kran air Kw.1 Bh 34,100.00
30 Stop kran 3/4" Bh 60,500.00
31 Stop kran 1/2" Bh 46,700.00
32 Stop kran 2" Bh 95,100.00
33 Pintu Vynil KM/WC (190x70) Cm kw 1 Unit 297,000.00
34 Seal tape Bh 2,300.00
35 Floor drain plastik Bh 11,000.00
36 Floor drain alluminium / stainless Bh 33,000.00
37 Grefel beton d. 20 cm (Pjg. 1 M) Bh 34,100.00
38 Grefel beton d. 30 cm (Pjg. 1 M) Bh 49,500.00
39 Paving block warna 6 cm (36 Bh/M2) M2 40,700.00
40 Paving block warna 8 cm (36 Bh/M2) M2 49,500.00
41 Paving block natural 6 cm (36 Bh/M2) M2 38,500.00
42 Paving block natural 8 cm (36 Bh/M2) M2 47,300.00
43 Kansteen beton (Uk. 60 x 30 cm) Bh 29,700.00

DAFTAR HARGA BAHAN BANGUNAN Halaman.6


NO. JENIS BAHAN / MATERIAL SATUAN HARGA (Rp.) KETERANGAN

1 2 3 4 5
44 Buis beton D. 20 (Pjg. 1 M, T = 3,5 Cm) Bh 55,000.00
45 Buis beton D. 30 (Pjg. 1 M, T = 3,5 Cm) Bh 71,500.00
46 Buis beton D. 40 (Pjg. 1 M, T=5 Cm) Bh 86,900.00
47 Buis beton D. 50 (Pjg. 1 M, T=8 Cm) Bh 95,700.00
48 Buis beton D. 60 (Pjg. 1 M, T=8 Cm) Bh 124,300.00
49 Buis beton D. 60 (Pjg. 0,5 M, T = 8 Cm) Bh 86,900.00
50 Buis beton D. 80 (Pjg. 0,5 M, T = 8 Cm) Bh 185,900.00
51 Buis beton D. 100 (Pjg. 0,5 M, T = 10 Cm) Bh 217,800.00

E. BAHAN PENUTUP ATAP, PLAFOND &


RANGKANYA.
1 Papan Gypsum T. 9 mm Lbr 93,500.00
2 List Gypsum T.10 cm M' 15,400.00
3 List Gypsum T.12 cm M' 18,700.00
4 List Gypsum T.15 cm M' 27,500.00
5 Papan GRC ( 120 x 240 ) Cm Lbr 57,500.00
6 Papan GRC ( 100 x 100 ) Cm Lbr 21,200.00
7 Papan GRC lebar 30 Cm panjang 240 Cm Lbr 63,800.00
8 Papan GRC lebar 20 Cm panjang 240 Cm Lbr 45,100.00
9 Papan GRC lebar 10 Cm panjang 240 Cm Lbr 38,500.00
10 Plat asbes T = 4 mm Lbr 17,000.00
11 Plat asbes T = 5 mm Lbr 18,700.00
12 Eternit (100 x 100 Cm), T=4mm Lbr 7,700.00
13 Asbes gelombang besar 5 mm 105 x 150 Lbr 79,700.00
14 Asbes gelombang kecil 4 mm 105 x 150 Lbr 45,100.00
15 Asbes gelombang (2,50 x 0,92) x 5 mm Lbr 86,500.00
16 Asbes gelombang (2,50 x 0,92) x 4 mm Lbr 84,100.00
17 Asbes gelombang (2,25 x 0,92) x 5 mm Lbr 78,500.00
18 Asbes gelombang (2,25 x 0,92) x 4 mm Lbr 75,300.00
19 Genteng plentong kecil (bakar) Bh 1,200.00
20 Genteng plentong super (bakar) Bh 1,400.00
21 Genteng kodok / alto natural Bh 3,100.00
22 Genteng kodok / alto transparant (brown) Bh 3,500.00
23 Genteng keramik morando natural Bh 2,700.00
24 Genteng keramik morando transparan Bh 2,900.00
25 Genteng keramik morando warna Bh 3,300.00
26 Genteng beton natural Bh 5,200.00
27 Genteng metal M2 130,900.00
28 Genteng Tegola M2 149,600.00
29 Bubung genteng plentong kecil Bh 2,300.00
30 Bubung genteng plentong super Bh 2,900.00
31 Bubung genteng kodok / alto natural Bh 4,900.00
32 Bubung genteng kodok / alto transparan (brown) Bh 7,400.00
33 Bubung genteng morando natural Bh 4,400.00
34 Bubung genteng morando transparan Bh 5,300.00

DAFTAR HARGA BAHAN BANGUNAN Halaman.7


NO. JENIS BAHAN / MATERIAL SATUAN HARGA (Rp.) KETERANGAN

1 2 3 4 5
35 Bubung genteng morando warna Bh 6,600.00
36 Bubung genteng beton natural Bh 5,200.00
37 Bubung genteng metal (P.90 cm) Bh 53,500.00
38 Genteng decra bond M' 43,600.00
39 Nok stel gelombang M' 28,600.00
40 Seng gelombang BJLS 28 ( 80 x 180 ) Lbr 59,400.00
41 Seng gelombang BJLS 30 ( 80 x 180 ) Lbr 79,200.00
42 Seng Plat BJLS 28 M2 47,300.00

F. BAHAN LANTAI & PELAPIS DINDING


1 Keramik warna 10 x 20 cm Kw.1 M2 47,300.00
2 Keramik putih 20 x 20 cm Kw.1 M2 44,000.00
3 Keramik warna 20 x 20 cm Kw.1 M2 51,700.00
4 Keramik putih 30 x 30 cm Kw.1 M2 38,500.00
5 Keramik warna 30 x 30 cm Kw.1 M2 47,300.00
6 Keramik warna 40 x 40 cm Kw.1 M2 58,300.00
7 Keramik Roman Grace warna 33 x 33 cm M2 99,000.00
8 Keramik putih 20 x 20 cm Anti slip Kw.1 M2 48,400.00
9 Keramik warna 20 x 20 cm Anti slip Kw.1 M2 58,300.00
10 Keramik warna 30 x 30 cm Anti slip Kw.1 M2 55,000.00
11 Keramik dinding warna 20 x 25 cm M2 52,800.00
12 Keramik dinding warna 25 x 33 cm M2 58,300.00
13 Keramik dinding polos 20 x 25 cm M2 45,100.00
14 Keramik Essenza 40 x 40 cm M2 238,700.00
15 Granito 40 x 40 cm M2 228,800.00
16 Granito 60 x 60 cm M2 233,200.00
17 Marmer M2 275,000.00
18 Granit M2 467,500.00
19 Stiffnes tangga Bh 13,700.00
20 Kuku macan polos M' 7,700.00
21 Kuku macan spiral M' 7,700.00
22 Tegel Badak Natural 20 x 20 cm Bh 1,500.00
23 Tegel Badak Natural 30 x 30 cm Bh 3,500.00
24 Tegel Badak Warna 20 x 20 cm Bh 2,200.00
25 Tegel Badak Warna 30 x 30 cm Bh 3,500.00
26 Grass Block 45 x 30 cm, T = 6,5 cm Bh 40,700.00
27 Parquet jati M2 224,400.00
28 Wallpaper M2 93,500.00

G. BAHAN KACA
1 Kaca Polos 3 mm M2 74,800.00
2 Kaca Polos 5 mm M2 108,900.00
3 Kaca Rayband 3 mm M2 74,800.00
4 Kaca Rayband 5 mm M2 112,200.00
5 Glass Block 20 x 20 cm Bh 24,200.00

DAFTAR HARGA BAHAN BANGUNAN Halaman.8


NO. JENIS BAHAN / MATERIAL SATUAN HARGA (Rp.) KETERANGAN

1 2 3 4 5
6 Jendela Naco + rangka Daun 93,500.00
7 Pintu besi M2 287,100.00
8 Jendela besi/teralis M2 231,000.00

H. BAHAN FINISHING, LABURAN, PENGISI


DAN ALATNYA
1 Plamir Tembok Kg 14,300.00
2 Plamir kayu Kg 24,200.00
3 Roll cat tembok Bh 18,700.00
4 Plincote Kg 33,000.00
5 Kuwas 3" Ltr 5,500.00
6 Oker Kg 9,300.00
7 Spirtus Ltr 16,500.00
8 Dempul halus (IMPRA) Kg 39,600.00
9 Bahan plitur (sirlak) India Kg 99,000.00
10 Melamik Kg 50,600.00
11 Thiner Impala Ltr 27,500.00
12 Terpentin Ltr 6,000.00
13 Vernis Ltr 37,400.00
14 Ampelas Lbr 2,700.00
15 Meni kayu / besi Kg 27,500.00
16 Cat Kayu Glotek Kg 45,100.00
17 Cat tembok Metrolite Kg 20,900.00
18 Cat genteng Kg 23,600.00
19 Cat besi klas I Kg 48,400.00
20 Cat Duco Kg 101,200.00
21 Batu apung Kg 37,400.00
22 Residu atau ter (Solignium) Ltr 13,200.00
23 Prime coat Kg 8,100.00
24 Soda Api Ltr 6,600.00
25 Bahan plitur jadi Merk Ultran-P Klg 49,500.00
26 Meni Besi Zincrhromate Kg 62,700.00
27 Cat Besi Pollyurethane Kg 280,500.00

I. BAHAN ALAT PENGGANTUNG & KUNCI


1 Kunci tanam double slaag Bh 108,200.00
2 Kunci tanam double slaag besar Bh 121,000.00
3 Engsel pintu Bh 23,100.00
4 Engsel jendela Bh 17,000.00
5 Kait angin Bh 8,800.00
6 Slot Jendela Bh 14,300.00
7 Slot Pintu 3" Bh 17,600.00
8 Slot Pintu 4" Bh 28,600.00
9 Door Closer Bh 183,700.00
10 Expanolete Psng 74,800.00

DAFTAR HARGA BAHAN BANGUNAN Halaman.9


NO. JENIS BAHAN / MATERIAL SATUAN HARGA (Rp.) KETERANGAN

1 2 3 4 5

J. BAHAN ALAT LISTRIK


1 Minyak begisting / olie Ltr 5,500.00
2 Premium / Bensin Ltr 5,500.00
3 Solar Ltr 5,500.00
4 Minyak Tanah Ltr 8,800.00
5 Aspal Bitumen Kg 9,900.00
6 Material Hotmix (HRS) Ton 1,370,600.00

K. BAHAN ALAT LISTRIK


1 Titik Lampu lengkap Ttk 86,000.00
2 Saklar Tunggal Broco Bh 19,800.00
3 Saklar Double Broco Bh 25,800.00
4 Stop Kontak (dua lubang) Bh 19,800.00
5 Stop Kontak AC (tiga lubang) Bh 71,500.00
6 Lampu Kapsul 18 Watt Bh 37,400.00
7 Lampu Kapsul 9 Watt Bh 29,700.00
8 Lampu Pijar 25 Watt Bh 5,500.00
9 Lampu Pijar 40 Watt Bh 5,500.00
10 Lampu Pijar 60 Watt Bh 7,700.00
11 Lampu TL.1 x 40 Watt Phillips Bh 110,000.00
12 Lampu TL.2 x 40 Watt Phillips Bh 195,800.00
13 Lampu TL.1 x 20 Watt Phillips Bh 100,100.00
14 Lampu TL.2 x 20 Watt Phillips Bh 161,700.00
15 Lampu TL.2 x 20 Watt RM Bh 287,100.00
16 Lampu Taman Bh 161,700.00
17 Armatur Lampu Baret Bh 62,700.00
18 Dudukan Down Light Stainlessteel Bh 59,400.00
19 Kabel NYM 3 x 2,5 mm M' 14,900.00
20 Kabel NYM 3 x 1,5 mm M' 8,600.00
21 Kabel NYM 2 x 2,5 mm M' 7,700.00
22 Kabel NYM 2 x 1,5 mm M' 6,200.00
23 Kawat BC 25 mm M' 37,400.00
24 Kawat BC 16 mm M' 24,900.00
25 Kawat BC 6 mm M' 15,600.00
26 Lampu Down Light 4" Bh 37,400.00
27 Lampu Down Light 3" Bh 32,400.00
28 Fitting planfond kotak Bh 10,500.00
29 MCB Bh 37,400.00

DAFTAR HARGA BAHAN BANGUNAN Halaman.10


NO. JENIS BAHAN / MATERIAL SATUAN HARGA (Rp.) KETERANGAN

1 2 3 4 5

l.. ALAT BANTU Set 83,100.00


1 Cangkul / Sekop Bh 40,700.00
2 Parang Bh 24,900.00
3 Pikulan dan 2 bakul Bh 17,400.00

PT REKA CIPTA BINA SEMESTA

HERI MUSTIKA, ST

DAFTAR HARGA BAHAN BANGUNAN Halaman.11


ANALISA BIAYA KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN

HARGA UPAH BAHAN JUMLAH


NO. URAIAN PEKERJAAN INDEKS/SAT
SATUAN (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5=(3x4) 6=(3x4) 7=(5+6)
A.1a 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK
BAHAN
Kayu Kaso 5/7 (Albasia) 0.0120 M3 1,744,600.00 20,935.20 20,935.20
Paku Biasa 2" - 5" 0.0200 Kg 17,600.00 352.00 352.00
Kayu Papan 3/20 (Albasia) 0.0070 M3 1,870,000.00 13,090.00 13,090.00
UPAH
Kepala Tukang 0.0100 Org. 70,000.00 700.00 700.00
Pekerja 0.1000 Org. 60,000.00 6,000.00 6,000.00
Tukang Kayu 0.1000 Org. 65,000.00 6,500.00 6,500.00
Mandor 0.0050 Org. 80,000.00 400.00 400.00
JUMLAH 13,600.00 34,377.20 47,977.20
B.1. 1 M3 GALIAN TANAH BIASA SEDALAM 1 METER
UPAH
Pekerja 0.4000 Org 60,000.00 24,000.00 24,000.00
Mandor 0.0400 Org 80,000.00 3,200.00 3,200.00
JUMLAH 27,200.00 - 27,200.00
B.4a. 1 M3 URUGAN TANAH PAKAI ALAT BERAT DARI LUAR DIPADATKAN
BAHAN
Beli Tanah + Angkut Max 10 km 1.2000 M3 25,700.00 30,840.000 30,840.000
UPAH
Pek. Galian (10 Org.) 50% 0.6000 M3 27,200.00 8,160.00 8,160.00
Pek. Galian berbatu (10 Org.) 50% 0.6000 M3 42,460.00 12,738.00 12,738.00
Pek. Grading Plant (10 Org.) 50% 6.0000 M2 - - -
JUMLAH 20,898.00 30,840.00 51,738.00
B.11. 1 M3 URUGAN PASIR
BAHAN
Pasir Urug 1.2000 Org 130,000.00 156,000.00 156,000.00
UPAH
Pekerja 0.3000 Org 60,000.00 18,000.00 18,000.00
Mandor 0.0100 Org 80,000.00 800.00 800.00
JUMLAH 18,800.00 156,000.00 174,800.00
B.11a. 1 M3 URUGAN TANAH MERAH
BAHAN
Tanah Merah 1.2000 Org 73,200.00 87,840.00 87,840.00
UPAH
Pekerja 0.3000 Org 60,000.00 18,000.00 18,000.00
Mandor 0.0100 Org 80,000.00 800.00 800.00
JUMLAH 18,800.00 87,840.00 106,640.00
C.6. 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps
BAHAN
Batu Belah 1.1000 M3 197,700.00 217,470.00 217,470.00
Semen Portland 136.0000 Kg 1,500.00 204,000.00 204,000.00
Pasir Pasang 0.5440 M3 250,000.00 136,000.00 136,000.00
UPAH
Pekerja 1.5000 Org 60,000.00 90,000.00 90,000.00
Tukang Batu 0.6000 Org 65,000.00 39,000.00 39,000.00
Kepala Tukang 0.0600 Org 70,000.00 4,200.00 4,200.00
Mandor 0.0750 Org 80,000.00 6,000.00 6,000.00
JUMLAH 139,200.00 557,470.00 696,670.00
C.14. 1 M3 PASANG BATU KOSONG (AANSTAMPING)
BAHAN
Batu Belah 1.2000 M3 197,700.00 237,240.00 237,240.00
Pasir Urug 0.3000 M3 130,000.00 39,000.00 39,000.00
UPAH
Pekerja 0.7800 Org 60,000.00 46,800.00 46,800.00
Tukang Batu 0.3900 Org 65,000.00 25,350.00 25,350.00
Kepala Tukang 0.0390 Org 70,000.00 2,730.00 2,730.00
Mandor 0.0390 Org 80,000.00 3,120.00 3,120.00
JUMLAH 78,000.00 276,240.00 354,240.00

ANALISA BIAYA KONSTRUKSI Halaman 12


1 2 3 4 5=(3x4) 6=(3x4) 7=(5+6)
D.12. 1 M2 PASANG BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps
BAHAN
Bata Merah 70.0000 Bh 550.00 38,500.00 38,500.00
Semen Portland 9.6800 Kg 1,500.00 14,520.00 14,520.00
Pasir Pasang 0.0450 M3 250,000.00 11,250.00 11,250.00
UPAH
Pekerja 0.3200 Org 60,000.00 19,200.00 19,200.00
Tukang Batu 0.1000 Org 65,000.00 6,500.00 6,500.00
Kepala Tukang 0.0100 Org 70,000.00 700.00 700.00
Mandor 0.0150 Org 80,000.00 1,200.00 1,200.00
JUMLAH 27,600.00 64,270.00 91,870.00
E.4e. 1 M2 PLESTERAN, 1 Pc : 5 Ps + ACIAN
BAHAN
Semen Portland 5.0000 Kg 1,500.00 7,500.00 7,500.00
Pasir Pasang 0.0190 M3 250,000.00 4,750.00 4,750.00
UPAH
Pekerja 0.2860 Org 60,000.00 17,160.00 17,160.00
Tukang Batu 0.2140 Org 65,000.00 13,910.00 13,910.00
Kepala Tukang 0.0210 Org 70,000.00 1,470.00 1,470.00
Mandor 0.0200 Org 80,000.00 1,600.00 1,600.00
JUMLAH 34,140.00 12,250.00 46,390.00
F.3. 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU BORNEO
BAHAN
Kayu Kamper, Balok 1.2000 M3 4,752,000.00 5,702,400.00 5,702,400.00
UPAH
Pekerja 6.0000 Org 60,000.00 360,000.00 360,000.00
Tukang Kayu 18.0000 Org 65,000.00 1,170,000.00 1,170,000.00
Kepala Tukang 2.0000 Org 70,000.00 140,000.00 140,000.00
Mandor 0.3000 Org 80,000.00 24,000.00 24,000.00
JUMLAH 1,694,000.00 5,702,400.00 7,396,400.00
F.11a. 1 M2 PASANG PINTU DAN JENDELA KACA KAYU KRUING
BAHAN
Kayu Kruing, Papan 0.0350 M3 7,264,400.00 254,254.00 254,254.00
UPAH
Pekerja 0.8000 Org 60,000.00 48,000.00 48,000.00
Tukang Kayu 2.0000 Org 65,000.00 130,000.00 130,000.00
Kepala Tukang 0.2000 Org 70,000.00 14,000.00 14,000.00
Mandor 0.0400 Org 80,000.00 3,200.00 3,200.00
JUMLAH 195,200.00 254,254.00 449,454.00
F.48a. 1 M' PASANG LISPLANK (3 x 20)cm, KAYU BORNEO
BAHAN
Kayu Borneo, Papan 0.0072 M3 5,359,200.00 38,586.24 38,586.24
Paku Biasa 2" - 5" 0.0500 Kg 17,600.00 880.00 880.00
UPAH
Pekerja 0.1000 Org 60,000.00 6,000.00 6,000.00
Tukang Kayu 0.2000 Org 65,000.00 13,000.00 13,000.00
Kepala Tukang 0.0200 Org 70,000.00 1,400.00 1,400.00
Mandor 0.0050 Org 80,000.00 400.00 400.00
JUMLAH 20,800.00 39,466.24 60,266.24
G.1. 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
BAHAN
Semen Portland 218.0000 Kg 1,500.00 327,000.00 327,000.00
Pasir Beton 0.5200 M3 270,000.00 140,400.00 140,400.00
Koral Beton 0.8700 M3 240,000.00 208,800.00 208,800.00
UPAH
Pekerja 1.6500 Org 60,000.00 99,000.00 99,000.00
Tukang Batu 0.2500 Org 65,000.00 16,250.00 16,250.00
Kepala Tukang 0.0250 Org 70,000.00 1,750.00 1,750.00
Mandor 0.0800 Org 80,000.00 6,400.00 6,400.00
JUMLAH 123,400.00 676,200.00 799,600.00
G.4a. 1 M3 COR BETON SITE MIX K. 175
BAHAN
Semen Portland 340.0000 Kg 1,500.00 510,000.00 510,000.00
Splith Pecah mesin 2/3 0.8300 M3 250,000.00 207,500.00 207,500.00
Pasir Beton 0.5400 M3 270,000.00 145,800.00 145,800.00
UPAH
Pekerja 1.5000 Org 60,000.00 90,000.00 90,000.00
Tukang Batu 0.5000 Org 65,000.00 32,500.00 32,500.00
Kepala Tukang 0.0500 Org 70,000.00 3,500.00 3,500.00
Mandor 0.0100 Org 80,000.00 800.00 800.00
Peralatan 0.0750 Lot - - -
JUMLAH 126,800.00 863,300.00 990,100.00

ANALISA BIAYA KONSTRUKSI Halaman 13


1 2 3 4 5=(3x4) 6=(3x4) 7=(5+6)
G.4b. 1 M3 COR BETON SITE MIX K. 225
BAHAN
Semen Portland 394.0000 Kg 1,500.00 591,000.00 591,000.00
Splith Pecah mesin 2/3 0.8100 M3 250,000.00 202,500.00 202,500.00
Pasir Beton 0.4900 M3 270,000.00 132,300.00 132,300.00
UPAH
Pekerja 1.5000 Org 60,000.00 90,000.00 90,000.00
Tukang Batu 0.5000 Org 65,000.00 32,500.00 32,500.00
Kepala Tukang 0.0500 Org 70,000.00 3,500.00 3,500.00
Mandor 0.0100 Org 80,000.00 800.00 800.00
Peralatan 0.0700 Lot - - -
JUMLAH 126,800.00 925,800.00 1,052,600.00
G.25a. 1 KG PEMBESIAN DENGAN BESI PLOS ATAU BESI ULIR
BAHAN
Besi Beton (polos / Ulir) 1.0500 Kg 11,600.00 12,180.00 12,180.00
Kawat beton 0.0100 Kg 20,000.00 200.00 200.00
UPAH
Peralatan / Spenser 0.0200 Lot - - -
Tukang Besi 0.0400 Org 65,000.00 2,600.00 2,600.00
Kepala Tukang 0.0100 Org 70,000.00 700.00 700.00
Mandor 0.0050 Org 80,000.00 400.00 400.00
JUMLAH 3,700.00 12,380.00 16,080.00
MENGERJAKAN PEMBESIAN TULANGAN BETON
G.25a.4 PEMBESIAN UNTUK SLOOF 20/30 125.00 Kg/M3 462,500.00 1,547,500.00 2,010,000.00
G.25a.5 PEMBESIAN UNTUK KOLOM PRAKTIS 12/12 235.42 Kg/M3 871,054.00 2,914,499.60 3,785,553.60
G.25a.8 PEMBESIAN UNTUK KOLOM 25/25 192.64 Kg/M3 712,768.00 2,384,883.20 3,097,651.20
G.25a.11 PEMBESIAN UNTUK KOLOM 30/35 179.43 Kg/M3 663,891.00 2,221,343.40 2,885,234.40
G.25a.13 PEMBESIAN UNTUK RINGBALK 15/20 166.67 Kg/M3 616,679.00 2,063,374.60 2,680,053.60
G.25a.16 PEMBESIAN UNTUK BALOK LATEI 10/10 320.00 Kg/M3 1,184,000.00 3,961,600.00 5,145,600.00
G.25a.17 PEMBESIAN UNTUK PLAT DAK BETON T.12 CM 152.42 Kg/M3 563,954.00 1,886,959.60 2,450,913.60
G.25a.18 PEMBESIAN UNTUK BALOK 20/30 190.00 Kg/M3 703,000.00 2,352,200.00 3,055,200.00
G.25a.18a PEMBESIAN UNTUK BALOK 10/30 89.59 Kg/M3 331,490.67 1,109,149.85 1,440,640.52
G.25a.19 PEMBESIAN UNTUK BALOK 20/40 213.25 Kg/M3 789,025.00 2,640,035.00 3,429,060.00
G.25a.21 PEMBESIAN UNTUK BALOK 30/60 190.56 Kg/M3 705,072.00 2,359,132.80 3,064,204.80
G.25a.23 PEMBESIAN UNTUK PONDASI PLAT T.20 CM 166.00 Kg/M3 614,200.00 2,055,080.00 2,669,280.00
G.25a.24 PEMBESIAN UNTUK PONDASI PLAT T.25 CM 137.80 Kg/M3 509,860.00 1,705,964.00 2,215,824.00
G.25a.39 PEMBESIAN UTK PLAT LISTPLANK, KANOPI T.8 CM 83.13 Kg/M3 307,581.00 1,029,149.40 1,336,730.40
G.29. 1 M2 PASANG BEGISTING PAPAN
BAHAN
Kaso 5/7 Borneo (2 x pakai) 50% 0.0170 M3 3,746,600.00 31,846.10 31,846.10
Papan Terentang (2 x pakai) 75% 0.0240 M3 1,870,000.00 33,660.00 33,660.00
Paku Biasa 2" - 5" 0.4000 Kg 17,600.00 7,040.00 7,040.00
UPAH
Pekerja 0.1200 Org 60,000.00 7,200.00 7,200.00
Tukang Kayu 0.1500 Org 65,000.00 9,750.00 9,750.00
Kepala Tukang 0.1500 Org 70,000.00 10,500.00 10,500.00
Tukang kayu 1/2 terampil (bongkar cerakan) 0.1200 Org 65,000.00 7,800.00 7,800.00
Mandor 0.0500 Org 80,000.00 4,000.00 4,000.00
JUMLAH 39,250.00 72,546.10 111,796.10
MENGERJAKAN BEKISTING DGN PAPAN
G.29d. BEKISTING UNTUK 1 M3 SLOOF 20/30 10.00 M2 X 70 % 274,750.00 507,822.70 782,572.70
G.29e. BEKISTING UNTUK 1 M3 KOLOM PRAKTIS 12/12 16.67 M2 X 70 % 458,008.25 846,540.44 1,304,548.69
G.29h. BEKISTING UNTUK 1 M3 KOLOM 25/25 16.00 M2 X 70 % 439,600.00 812,516.32 1,252,116.32
G.29m. BEKISTING UNTUK 1 M3 BALOK 15/20 13.33 M2 X 70 % 366,241.75 676,927.66 1,043,169.41
G.29p. BEKISTING UNTUK BALOK LATEI 10/10 20.00 M2 X 70 % 549,500.00 1,015,645.40 1,565,145.40
G.29q. BEKISTING UNTUK PLAT DAK BETON T.12 CM 8.33 M2 X 70 % 228,866.75 423,016.31 651,883.06
G.29r. BEKISTING UNTUK BALOK 10/30 13.33 M2 X 70 % 366,241.75 676,927.66 1,043,169.41
G.29r. BEKISTING UNTUK BALOK 10/30 13.33 M2 X 54 % 366,241.75 516,761.35 883,003.10
G.29s. BEKISTING UNTUK BALOK 20/40 12.50 M2 X 70 % 343,437.50 634,778.38 978,215.88
G.29u. BEKISTING UNTUK BALOK 30/60 8.33 M2 X 70 % 228,866.75 423,016.31 651,883.06
G.29w. BEKISTING UNTUK PONDASI PLAT T.20 CM 4.00 M2 X 70 % 109,900.00 203,129.08 313,029.08
G.29x. BEKISTING UNTUK PONDASI PLAT T.25 CM 4.00 M2 X 70 % 109,900.00 203,129.08 313,029.08
G.29z.13 BEKISTING UTK PLAT LISTPLANK, KANOPI T.8 CM 12.50 M2 X 70 % 343,437.50 634,778.38 978,215.88
H.2c. 1 M2 PASANG ATAP GENTENG MORANDO NATURAL
BAHAN
Genteng Morando Natural 18.000 Bh 2,700.00 48,600.00 48,600.00
UPAH
Pekerja 0.150 Org 60,000.00 9,000.00 9,000.00
Tukang Kayu 0.075 Org 65,000.00 4,875.00 4,875.00
Kepala Tukang 0.008 Org 70,000.00 560.00 560.00
Mandor 0.008 Org 80,000.00 640.00 640.00
JUMLAH 15,075.00 48,600.00 63,675.00

ANALISA BIAYA KONSTRUKSI Halaman 14


1 2 3 4 5=(3x4) 6=(3x4) 7=(5+6)
H.5c. 1 M' PASANG GENTENG BUBUNG MORANDO NATURAL
BAHAN
Genteng Bubung Morando Natural 4.000 Bh 4,400.00 17,600.00 17,600.00
Semen portland 8.000 Kg 1,500.00 12,000.00 12,000.00
Pasir pasang 0.032 M3 250,000.00 8,000.00 8,000.00
UPAH
Pekerja 0.400 Org 60,000.00 24,000.00 24,000.00
Tukang Kayu 0.200 Org 65,000.00 13,000.00 13,000.00
Kepala Tukang 0.020 Org 70,000.00 1,400.00 1,400.00
Mandor 0.002 Org 80,000.00 160.00 160.00
JUMLAH 38,560.00 37,600.00 76,160.00
I.20b. 1 M2 LANGIT-LANGIT ETERNIT (1,00 x 1,00) M, RANGKA BORNEO
BAHAN
Kayu Borneo, Balok 0.0120 M3 4,752,000.00 57,024.00 57,024.00
Paku Biasa 1/2" - 1" 0.0600 Kg 22,000.00 1,320.00 1,320.00
Eternit 1,00 x 1,00 m 1.1000 Lbr 7,700.00 8,470.00 8,470.00
UPAH
Pekerja 0.1800 Org 60,000.00 10,800.00 10,800.00
Tukang Kayu 0.3200 Org 65,000.00 20,800.00 20,800.00
Kepala Tukang 0.0320 Org 70,000.00 2,240.00 2,240.00
Mandor 0.0090 Org 80,000.00 720.00 720.00
JUMLAH 34,560.00 66,814.00 101,374.00
J.5. MEMASANG 1 BUAH WASHTAFEL
BAHAN
Washtafel 1.0000 Bh 446,600.00 446,600.00 446,600.00
Perlengkapan (20% Harga Fashtafel) 1.0000 Ls 89,320.00 89,320.00 89,320.00
UPAH
Pekerja 1.2000 Org 60,000.00 72,000.00 72,000.00
Tukang Batu 1.4500 Org 65,000.00 94,250.00 94,250.00
Kepala Tukang 0.1500 Org 70,000.00 10,500.00 10,500.00
Mandor 0.1000 Org 80,000.00 8,000.00 8,000.00
JUMLAH 184,750.00 535,920.00 720,670.00
L.2 1 BH PASANG KUNCI TANAM DOUBLE SLAAG
BAHAN
Kunci Tanam Double Slaag 1.000 Bh 108,200.00 108,200.00 108,200.00
UPAH
Pekerja 0.010 Org 60,000.00 600.00 600.00
Tukang Kayu 0.500 Org 65,000.00 32,500.00 32,500.00
Kepala Tukang 0.010 Org 70,000.00 700.00 700.00
Mandor 0.0050 Org 80,000.00 400.00 400.00
JUMLAH 34,200.00 108,200.00 142,400.00
L.5 1 BH PASANG ENGSELPINTU
BAHAN
Engsel Pintu 1.000 Bh 23,100.00 23,100.00 23,100.00
UPAH
Pekerja 0.015 Org 60,000.00 900.00 900.00
Tukang Kayu 0.150 Org 65,000.00 9,750.00 9,750.00
Kepala Tukang 0.015 Org 70,000.00 1,050.00 1,050.00
Mandor 0.0008 Org 80,000.00 60.00 60.00
JUMLAH 11,760.00 23,100.00 34,860.00
L.6 1 BH PASANG ENGSELJENDELA KUPU-KUPU
BAHAN
Engsel Jendela 1.000 Bh 17,000.00 17,000.00 17,000.00
UPAH
Pekerja 0.010 Org 60,000.00 600.00 600.00
Tukang Kayu 0.100 Org 65,000.00 6,500.00 6,500.00
Kepala Tukang 0.010 Org 70,000.00 700.00 700.00
Mandor 0.0005 Org 80,000.00 40.00 40.00
JUMLAH 7,840.00 17,000.00 24,840.00
L.9 1 BH PASANG KAIT ANGIN
BAHAN
Kait Angin 1.000 Bh 8,800.00 8,800.00 8,800.00
UPAH
Pekerja 0.015 Org 60,000.00 900.00 900.00
Tukang Kayu 0.150 Org 65,000.00 9,750.00 9,750.00
Kepala Tukang 0.015 Org 70,000.00 1,050.00 1,050.00
Mandor 0.0008 Org 80,000.00 60.00 60.00
JUMLAH 11,760.00 8,800.00 20,560.00

ANALISA BIAYA KONSTRUKSI Halaman 15


1 2 3 4 5=(3x4) 6=(3x4) 7=(5+6)
L.11 1 BH PASANG KUNCI SELOT
BAHAN
Kunci Selot 1.000 Bh 14,300.00 14,300.00 14,300.00
UPAH
Pekerja 0.010 Org 60,000.00 600.00 600.00
Tukang Kayu 0.100 Org 65,000.00 6,500.00 6,500.00
Kepala Tukang 0.010 Org 70,000.00 700.00 700.00
Mandor 0.00050 Org 80,000.00 40.00 40.00
JUMLAH 7,840.00 14,300.00 22,140.00
L.17 1 M2 PASANG KACA POLOS, TEBAL 5 mm
BAHAN
Kaca Polos t.5 mm 1.1000 M2 108,900.00 119,790.00 119,790.00
UPAH
Pekerja 0.0150 Org 60,000.00 900.00 900.00
Tukang Kayu 0.1500 Org 65,000.00 9,750.00 9,750.00
Kepala Tukang 0.0150 Org 70,000.00 1,050.00 1,050.00
Mandor 0.0008 Org 80,000.00 64.00 64.00
JUMLAH 11,764.00 119,790.00 131,554.00
M.5a 1 M2 PASANG LANTAI KERAMIK PUTIH UKURAN 30 x 30 cm
BAHAN
Keramik Putih 30 x 30 cm 1.0100 M2 38,500.00 38,885.00 38,885.00
Semen portland 8.0000 Kg 1,500.00 12,000.00 12,000.00
Pasir Pasang 0.0300 M3 250,000.00 7,500.00 7,500.00
Semen Warna 0.0130 Kg 14,500.00 188.50 188.50
UPAH
Pekerja 0.1875 Org 60,000.00 11,250.00 11,250.00
Tukang Batu 0.3750 Org 65,000.00 24,375.00 24,375.00
Kepala Tukang 0.0750 Org 70,000.00 5,250.00 5,250.00
Mandor 0.0188 Org 80,000.00 1,504.00 1,504.00
JUMLAH 42,379.00 58,573.50 100,952.50
N.8 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
BAHAN
Cat Meni 0.2000 Kg 27,500.00 5,500.00 5,500.00
Plamir 0.1500 Kg 24,200.00 3,630.00 3,630.00
Cat Dasar 0.1700 Kg 45,100.00 7,667.00 7,667.00
Cat Penutup 2x 0.2600 Kg 45,100.00 11,726.00 11,726.00
Ampelas 0.4000 Lbr 2,700.00 1,080.00 1,080.00
Minyak Cat 0.1500 Ltr 27,500.00 4,125.00 4,125.00
Kuas 0.0500 Bh 5,500.00 275.00 275.00
UPAH
Pekerja 0.0700 Org 60,000.00 4,200.00 4,200.00
Tukang Cat 0.0090 Org 65,000.00 585.00 585.00
Kepala Tukang 0.0060 Org 70,000.00 420.00 420.00
Mandor 0.0025 Org 80,000.00 200.00 200.00
JUMLAH 5,405.00 34,003.00 39,408.00
N.14 1 M2 PENGECATAN TEMBOK BARU 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
BAHAN
Plamir 0.1000 Kg 14,300.00 1,430.00 1,430.00
Cat Dasar 0.1000 Kg 20,900.00 2,090.00 2,090.00
Cat Penutup 2x 0.2600 Kg 20,900.00 5,434.00 5,434.00
Roll Cat 0.0100 Bh 18,700.00 187.00 187.00
Ampelas 0.5000 Lbr 2,700.00 1,350.00 1,350.00
UPAH
Pekerja 0.0200 Org 60,000.00 1,200.00 1,200.00
Tukang Cat 0.0630 Org 65,000.00 4,095.00 4,095.00
Kepala Tukang 0.0063 Org 70,000.00 441.00 441.00
Mandor 0.0025 Org 80,000.00 200.00 200.00
JUMLAH 5,936.00 10,491.00 16,427.00

PT REKA CIPTA BINA SEMESTA

HERI MUSTIKA, ST

ANALISA BIAYA KONSTRUKSI Halaman 16


DAFTAR HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2011

KODE HARGA SATUAN JUMLAH


NO. URAIAN PEKERJAAN
ANALISA UPAH (Rp.) BAHAN (Rp.) ALAT (Rp.) (Rp.)
1 2 3 4 5 6 7=(4+5+6)
PEKERJAAN PERSIAPAN
1 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK A.1a 13,600.00 34,377.20 47,977.20
2 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK (Menggunakan Alat Ukur) A.1b 20,150.00 34,377.20 54,527.20
3 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M A.3. 40,000.00 373,851.20 413,851.20
4 1 M2 PEMBUATAN KANTOR SEMENTARA (DIREKSI KEET) A.5. - 687,540.00 687,540.00
5 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN (MENGGUNAKAN BURUH) A.8. 10,000.00 - 10,000.00
6 1 M2 PEMBUATAN BAK ADUK UKURAN 40 X 50 X 20 CM A.10. 19,660.00 116,666.00 136,326.00
7 1 M2 PEMBUATAN STEGGER DARI BAMBU UKURAN 40 X 50 X 20 CM A.11. 17,285.00 31,175.00 48,460.00
8 1 M2 PEMBUATAN PAPAN NAMA PROYEK A.11.a - 374,792.00 374,792.00
9 1 M2 PEMBUATAN PAPAN NAMA PROYEK DIGITAL PRINTING A.11.a.Rob - 160,890.40 160,890.40
10 1 M2 PEMBUATAN PAGAR PENGAMAN PROYEK A.11.b - 332,639.88 332,639.88
11 1 M2 PASANGAN STOOT WERK A.11.c 37,360.00 82,370.00 119,730.00
12 1 M3 BONGKARAN BETON BERTULANG A.13 426,660.00 - 426,660.00
13 1 M3 BONGKARAN DINDING BATA MERAH (bongkaran dipakai lagi) A.14 127,200.00 - 127,200.00
14 1 M3 BONGKARAN DINDING BATA MERAH (bongkaran tidak dipakai lagi ) A.15 67,200.00 - 67,200.00
15 1 M2 MEMBONGKAR PLESTERAN DINDING BATA A.16 67,200.00 - 67,200.00
16 1 M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai lagi) A.17 2,000.00 - 2,000.00
17 1 M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi) A.18 4,000.00 - 4,000.00
18 1 M2 MEMBONGKAR RANGKA ATAP (bongkaran tidak dipakai lagi) A.19 8,200.00 - 8,200.00
19 1 M2 MEMBONGKAR RANGKA ATAP (bongkaran dipakai lagi) A.20 16,400.00 - 16,400.00
20 1 M3 MEMBONGKAR KUDA-KUDA DAN GORDING (bongkaran dipakai lagi) A.21 688,000.00 - 688,000.00
21 1 M3 MEMBONGKAR KUDA-KUDA DAN GORDING (bongkaran tdk dipakai) A.22 451,000.00 - 451,000.00
22 1 M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi) A.23 22,825.00 - 22,825.00
23 1 M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi) A.24 7,900.00 - 7,900.00

PEKERJAAN TANAH
1 1 M3 GALIAN TANAH BIASA SEDALAM 1 METER B.1. 27,200.00 - 27,200.00
2 1 M3 GALIAN TANAH BIASA SEDALAM 2 METER B.2. 35,720.00 - 35,720.00
3 1 M3 GALIAN TANAH KERAS SEDALAM 1 METER B.4. 42,460.00 - 42,460.00
4 1 M3 URUGAN TANAH PAKAI ALAT BERAT DARI LUAR DIPADATKAN B.4a. 20,898.00 30,840.00 51,738.00
5 1 M3 GALIAN TANAH CADAS SEDALAM 1 METER B.5. 85,000.00 - 85,000.00
6 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METER B.6. 56,020.00 - 56,020.00
7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER B.7. 3,400.00 - 3,400.00
8 1 M3 PEMBUANGAN TANAH SEJAUH 150 METER B.8. 34,960.00 - 34,960.00
9 1 M3 URUGAN KEMBALI B.9. 13,040.00 - 13,040.00
10 1 M3 PEMADATAN TANAH (MENGGUNAKAN BURUH) B.10. 34,000.00 - 34,000.00
11 1 M3 URUGAN PASIR B.11. 18,800.00 156,000.00 174,800.00
12 1 M3 URUGAN TANAH MERAH B.11a. 18,800.00 87,840.00 106,640.00
13 1 M3 URUGAN SIRTU B.15. 17,000.00 202,560.00 219,560.00
14 1 M2 PEMBUATAN JALAN SEMENTARA, TEBAL 25 CM B.16. 60,800.00 68,067.50 128,867.50
PEKERJAAN PONDASI
1 1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 Ps C.2. 139,200.00 724,720.00 863,920.00
2 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps C.4. 139,200.00 641,720.00 780,920.00
3 1 M3 PASANG PONDASI BATU KALI LAMA 1 Pc : 3 Ps C.4.a 139,200.00 424,250.00 563,450.00
4 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps C.5. 139,200.00 591,970.00 731,170.00
5 1 M3 PASANG PONDASI BATU KALI LAMA 1 Pc : 4 Ps C.5.a 139,200.00 374,500.00 513,700.00
6 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps C.6. 139,200.00 557,470.00 696,670.00
7 1 M3 PASANG PONDASI BATU KALI LAMA 1 Pc : 5 Ps C.6.a 139,200.00 340,000.00 479,200.00
8 1 M3 PASANG BATU KOSONG (AANSTAMPING) C.14. 78,000.00 276,240.00 354,240.00
9 1 M3 PASANG PONDASI SIKLOP 40% BATU KALI C.15. 253,200.00 1,393,000.00 1,646,200.00
10 1 M3 PASANG PONDASI SUMURAN DIAMETER 100 CM C.16. 170,800.00 791,265.00 962,065.00
PEKERJAAN DINDING
1 1 M2 PASANG BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps D.10. 27,600.00 70,055.00 97,655.00
2 1 M2 PASANG BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps D.11. 27,600.00 66,500.00 94,100.00
3 1 M2 PASANG BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps D.12. 27,600.00 64,270.00 91,870.00
4 1 M2 PASANG BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps D.12.a 55,800.00 135,800.00 191,600.00
5 1 M2 PASANG ROOSTER KERAWANG D.12.Rob 27,600.00 101,010.00 128,610.00
6 1 M2 PASANG DINDING ROSTER CETAK (16 x 16 x 8 ) CM D.22. 26,400.00 156,650.00 183,050.00
7 1 M2 PASANG DINDING CONBLOCK D.23. 31,645.00 122,767.00 154,412.00
8 1 M2 PASANG DINDING ANYAMAN BAMBU , RANGKA KAYU D.24. 9,760.00 79,076.20 88,836.20
9 1 M2 PASANG DINDING DIORAMA D.25. 467,548.00 284,420.00 751,968.00
10 1 M2 PASANG DINDING ALUCUBOND D.26. 100,838.00 332,221.12 433,059.12
11 1 M2 PASANG DINDING MARMER D.27. 92,800.00 329,360.00 422,160.00
PEKERJAAN PLESTERAN
1 1 M2 PLESTERAN, 1 Pc : 3 PS, TEBAL 15 mm E.3. 23,600.00 14,470.00 38,070.00
2 1 M2 PLESTERAN, 1 Pc : 4 PS, TEBAL 15 mm E.4. 23,600.00 12,800.00 36,400.00
3 1 M2 PLESTERAN, 1 Pc : 5 Ps , TEBAL 15 mm E.5. 31,040.00 15,855.00 46,895.00
1 1 M2 PLESTERAN, 1 Pc : 3 Ps + ACIAN E.4b. 34,140.00 16,750.00 50,890.00
2 1 M2 ACIAN PC E.4c. 17,070.00 6,000.00 23,070.00
3 1 M2 PLESTERAN, 1 Pc : 4 Ps + ACIAN E.4d. 34,140.00 15,280.00 49,420.00
4 1 M2 PLESTERAN, 1 Pc : 5 Ps + ACIAN E.4e. 34,140.00 12,250.00 46,390.00
5 1 M2 KAMPROTAN, 1 Pc : 5 Ps E.4e.rob 25,605.00 9,187.50 34,792.50
6 1 M2 PLESTERAN BETON , 1 Pc : 3 Ps TEBAL 15 mm E.27. 31,040.00 15,855.00 46,895.00
7 1 M2 PLESTERAN SIAR ADUKAN 1 Pc : 2 Ps E.35. 14,680.00 10,480.00 25,160.00

HARGA SATUAN PEKERJAAN Halaman 17


KODE HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN
ANALISA UPAH (Rp.) BAHAN (Rp.) ALAT (Rp.) (Rp.)
1 2 3 4 5 6 7=(4+5+6)
PEKERJAAN KAYU
1 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KAMPER F.2. 1,694,000.00 11,041,800.00 12,735,800.00
2 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU BORNEO F.3. 1,694,000.00 5,702,400.00 7,396,400.00
3 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KRUING F.4. 1,694,000.00 7,580,760.00 9,274,760.00
4 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU JATI JABAR F.5. 1,694,000.00 17,199,600.00 18,893,600.00
5 1 M2 PASANG PINTU PANEL KAYU KAMPER F.8. 244,000.00 406,296.00 650,296.00
6 1 M2 PASANG PINTU PANEL KAYU KRUING F.8b. 244,000.00 290,576.00 534,576.00
7 1 M2 PASANG PINTU PANEL KAYU JATI JABAR F.9. 244,000.00 623,172.00 867,172.00
8 1 M2 PASANG PINTU DAN JENDELA KACA KAYU KAMPER F.10. 195,200.00 355,509.00 550,709.00
9 1 M2 PASANG PINTU DAN JENDELA KACA KAYU KRUING F.11a. 195,200.00 254,254.00 449,454.00
10 1 M2 PASANG JALUSI MATI KUSEN KAYU KAMPER F.17. 176,000.00 612,084.00 788,084.00
11 1 M2 PASANG JALUSI MATI KUSEN KAYU KRUING F.17b. 176,000.00 438,504.00 614,504.00
12 1 M2 PASANG PINTU TEACKWOOD RANGKAP, RANGKA KAYU KAMPER F.20. 182,400.00 313,550.04 495,950.04
13 1 M2 PASANG PINTU MULTIPLEX , RANGKA KAYU KAMPER F.20a. 182,400.00 322,625.04 505,025.04
14 1 M2 PASANG PINTU TEACKWOOD RANGKAP , RANGKA KAYU KRUING F.20b. 182,400.00 256,847.24 439,247.24
15 1 M2 PASANG PINTU DOUBLE TRIPLEK , RANGKA KAYU KRUING F.20c. 182,400.00 206,522.24 388,922.24
16 1 M2 PASANG PINTU DOUBLE TRIPLEK , RANGKA KAYU LAMA F.20d. 182,400.00 64,140.00 246,540.00
17 1 M2 PASANG TEAKWOOD UNTUK PELAPIS TIMBAL F.20b.Rob 91,200.00 53,955.00 145,155.00
18 1 M2 PASANG PINTU TRIPLEK , RANGKA KAYU KRUING LAPIS SENG F.20c.Rob 182,400.00 338,962.24 521,362.24
19 1 M3 PASANG KONTRUKSI KUDA-KUDA KAYU KAMPER F.28. 1,120,000.00 10,308,230.00 11,428,230.00
20 1 M3 PASANG GORDING KAYU KAMPER F.28.a 560,000.00 10,135,730.00 10,695,730.00
21 1 M3 PASANG KONTRUKSI KUDA-KUDA KAYU BORNEO F.29. 1,120,000.00 5,413,780.00 6,533,780.00
22 1 M3 PASANG GORDING KAYU BORNEO F.29a. 560,000.00 5,241,280.00 5,801,280.00
23 1 M3 PASANG KONTRUKSI KUDA-KUDA KAYU KRUING F.30. 1,120,000.00 7,135,610.00 8,255,610.00
24 1 M3 PASANG GORDING KAYU KRUING F.30a. 560,000.00 6,963,110.00 7,523,110.00
25 1 M3 PASANG KONTRUKSI KUDA-KUDA KAYU LAMA F.30.Rob 1,120,000.00 186,580.00 1,306,580.00
26 1 M3 PASANG KASO + RENG GENTENG KODOK KAYU BORNEO F.32. 13,600.00 59,937.90 73,537.90
27 1 M3 PASANG KASO + RENG GENTENG KODOK KAYU KRUING F.32.a. 13,600.00 73,629.60 87,229.60
28 1 M2 PASANG KASO + RENG GENTENG PELENTONG KAYU DOLKEN F.32.b 13,600.00 26,890.00 40,490.00
29 1 M2 PASANG KASO DOLKEN + RENG KAYU BORNEO GENTENG PELENTONG F.32.C 13,600.00 24,678.70 38,278.70
30 1 M2 PASANG RANGKA ATAP KASO LAMA, RENG KAYU KRUING F.32.a.Rob 13,600.00 16,896.00 30,496.00
31 1 M2 PASANG RANGKA ATAP IJUK KASO DOLKEN + RENG BAMBU F.32.b.Rob 13,600.00 20,590.00 34,190.00
32 1 M2 PASANG RANGKA ATAP KASO LAMA, RENG KAYU BORNEO F.32.c.Rob 13,600.00 14,978.70 28,578.70
33 1 M2 PASANG KASO + RENG GENTENG MORANDO KAYU BORNEO F.35. 13,600.00 59,937.90 73,537.90
34 1 M2 PASANG KASO + RENG GENTENG MORANDO KAYU KRUING F.35b. 13,600.00 83,085.20 96,685.20
35 1 M2 PASANG RANGKA ATAP TEGOLA KAYU BORNEO F.35.Rob 13,600.00 47,599.20 61,199.20
36 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00 x 1.00)m, KAYU BORNEO F.40. 33,000.00 58,784.00 91,784.00
37 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00 x 1.00)m, KAYU KRUING F.40a. 33,000.00 77,567.60 110,567.60
38 1 M' PASANG LISPLANK (3 x 20)cm, KAYU KAMPER F.48. 20,800.00 74,013.28 94,813.28
39 1 M' PASANG LISPLANK (3 x 20)cm, KAYU BORNEO F.48a. 20,800.00 39,466.24 60,266.24
40 1 M' PASANG LISPLANK (3 x 20)cm, KAYU KRUING F.48b. 20,800.00 53,183.68 73,983.68
41 1 M' PASANG LISPLANK (3 x 5)cm, KAYU BORNEO F.48c. 20,800.00 10,526.56 31,326.56
42 1 M' PASANG LISPLANK TUMPANGSARI (2/10+3/30), KAYU KAMPER F.50. 22,840.00 112,611.40 135,451.40
43 1 M' PASANG LISPLANK TUMPANGSARI (2/10+3/30), KAYU KRUING F.50b. 22,840.00 80,788.40 103,628.40
44 1 M' PASANG LISPLANK 2(3 x 20)cm, KAYU KAMPER F.51. 33,000.00 148,338.30 181,338.30
45 1 M' PASANG LISPLANK 2(3 x 20)cm, KAYU KRUING F.51b. 33,000.00 106,389.80 139,389.80
46 1 M' PASANG LISPLANK GRC TUMPANGSARI (1/10 + 1/20) CM F.51.b.Rob 3,300.00 35,889.33 39,189.33
47 1 M' PASANG LISPLANK GRC TUMPANGSARI (1/10 + 1/30) CM F.51.c.Rob 3,300.00 43,681.00 46,981.00
48 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER F.54. 47,400.00 252,291.05 299,691.05
49 1 M2 PASANG RANGKA DINDING PEMISAH KAYU BORNEO F.55. 47,400.00 131,938.40 179,338.40
50 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KRUING F.55a. 47,400.00 175,798.15 223,198.15
51 1 M2 PASANG DINDING PEMISAH TEACKWOOD RANGKAP, RANGKA KAYU KAMPER F.56. 47,400.00 365,694.05 413,094.05
52 1 M2 PASANG DINDING PEMISAH TEACKWOOD RANGKAP, RANGKA KAYU BORNEO F.57. 47,400.00 245,341.40 292,741.40
53 1 M2 PASANG DINDING PEMISAH MULTIPLEKS 9 mm, RANGKA KAYU KRUING F.57.Rob 47,400.00 239,316.15 286,716.15
54 1 M2 PASANG DINDING PEMISAH TRIPLEKS 3 mm, RANGKA KAYU BORNEO F.57a. 47,400.00 195,016.40 242,416.40
55 1 M2 PASANG DINDING PEMISAH TEACKWOOD RANGKAP, RANGKA KAYU KRUING F.57b. 47,400.00 289,201.15 336,601.15
56 1 M2 PASANG TEACKWOOD TEBAL 4 MM UNTUK DINDING F.59. 7,004.00 55,220.00 62,224.00
57 1 M1 PASANG LIST PLAFOND - KAYU PROFIL F.60. 2,845.00 4,410.00 7,255.00
PEKERJAAN BETON, BESI & BEGISTING
1 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr G.1. 123,400.00 676,200.00 799,600.00
2 1 M3 COR BETON SITE MIX K. 175 G.4a. 126,800.00 863,300.00 990,100.00
3 1 M3 COR BETON SITE MIX K. 225 G.4b. 126,800.00 925,800.00 1,052,600.00
4 1 M3 COR BETON 1 Pc : 2 Ps : 3 Screenning G.4b.Rob 126,800.00 942,000.00 1,068,800.00
5 1 M3 COR BETON K. 225 READY MIX MAX. 6 M3 BERIKUT SELANG G.4e. 174,050.00 918,500.00 1,092,550.00
6 1 KG GANTUNGAN PLAFOND BESI D.10 mm G.4h. 1,850.00 12,380.00 14,230.00
7 1 KG PEKERJAAN IWF EX.DN G.4k. 3,946.00 11,865.00 15,811.00
8 1 KG PEKERJAAN BAJA SIKU/PROFIL EX.DN G.4l. 3,946.00 12,075.00 16,021.00
9 1 CM PENGELASAN LAS LISTRIK TEBAL KAWAT 4 MM G.4m. 590.00 317.00 907.00
10 1 TITIK MELOBANG KONSTRUKSI BESI DENGAN BOR G.4n. 4,590.00 - 4,590.00
4 1 KG BESI BETON TERPASANG U.24 G.25a. 3,700.00 12,380.00 16,080.00
PEMBESIAN UNTUK SLOOF 15/20 166.67 Kg/M3 G.25a.1 616,679.00 2,063,374.60 2,680,053.60
PEMBESIAN UNTUK SLOOF 15/25 163.47 Kg/M3 G.25a.2 604,839.00 2,023,758.60 2,628,597.60
PEMBESIAN UNTUK SLOOF 20/25 140.40 Kg/M3 G.25a.3 519,480.00 1,738,152.00 2,257,632.00
PEMBESIAN UNTUK SLOOF 20/30 125.00 Kg/M3 G.25a.4 462,500.00 1,547,500.00 2,010,000.00
PEMBESIAN UNTUK KOLOM PRAKTIS 12/12 235.42 Kg/M3 G.25a.5 871,054.00 2,914,499.60 3,785,553.60
PEMBESIAN UNTUK KOLOM 20/20 200.00 Kg/M3 G.25a.6 740,000.00 2,476,000.00 3,216,000.00
PEMBESIAN UNTUK KOLOM 20/25 180.80 Kg/M3 G.25a.7 668,960.00 2,238,304.00 2,907,264.00
PEMBESIAN UNTUK KOLOM 25/25 192.64 Kg/M3 G.25a.8 712,768.00 2,384,883.20 3,097,651.20

HARGA SATUAN PEKERJAAN Halaman 18


KODE HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN
ANALISA UPAH (Rp.) BAHAN (Rp.) ALAT (Rp.) (Rp.)
1 2 3 4 5 6 7=(4+5+6)
PEMBESIAN UNTUK KOLOM 25/30 200.53 Kg/M3 G.25a.9 741,961.00 2,482,561.40 3,224,522.40
PEMBESIAN UNTUK KOLOM 30/30 172.44 Kg/M3 G.25a.10 638,028.00 2,134,807.20 2,772,835.20
PEMBESIAN UNTUK KOLOM 30/35 179.43 Kg/M3 G.25a.11 663,891.00 2,221,343.40 2,885,234.40
PEMBESIAN UNTUK KOLOM 40/40 180.50 Kg/M3 G.25a.12 667,850.00 2,234,590.00 2,902,440.00
PEMBESIAN UNTUK RINGBALK 15/20 166.67 Kg/M3 G.25a.13 616,679.00 2,063,374.60 2,680,053.60
PEMBESIAN UNTUK BALOK 15/25 163.47 Kg/M3 G.25a.14 604,839.00 2,023,758.60 2,628,597.60
PEMBESIAN UNTUK BALOK 15/30 200.89 Kg/M3 G.25a.15 743,293.00 2,487,018.20 3,230,311.20
PEMBESIAN UNTUK BALOK LATEI 10/10 320.00 Kg/M3 G.25a.16 1,184,000.00 3,961,600.00 5,145,600.00
PEMBESIAN UNTUK PLAT DAK BETON T.12 CM 152.42 Kg/M3 G.25a.17 563,954.00 1,886,959.60 2,450,913.60
PEMBESIAN UNTUK PLAT DAK BETON T.10 CM 119.10 Kg/M3 G.25a.17a 440,670.00 1,474,458.00 1,915,128.00
PEMBESIAN UNTUK BALOK 20/30 190.00 Kg/M3 G.25a.18 331,490.67 1,109,149.85 1,440,640.52
PEMBESIAN UNTUK BALOK 20/40 213.25 Kg/M3 G.25a.19 789,025.00 2,640,035.00 3,429,060.00
PEMBESIAN UNTUK BALOK 25/50 192.80 Kg/M3 G.25a.20 713,360.00 2,386,864.00 3,100,224.00
PEMBESIAN UNTUK BALOK 30/60 190.56 Kg/M3 G.25a.21 705,072.00 2,359,132.80 3,064,204.80
PEMBESIAN UNTUK PONDASI POOR 105.00 Kg/M3 G.25a.22 388,500.00 1,299,900.00 1,688,400.00
PEMBESIAN UNTUK PONDASI PLAT T.20 CM 166.00 Kg/M3 G.25a.23 614,200.00 2,055,080.00 2,669,280.00
PEMBESIAN UNTUK PONDASI PLAT T.25 CM 137.80 Kg/M3 G.25a.24 509,860.00 1,705,964.00 2,215,824.00
PEMBESIAN UNTUK PONDASI PLAT T.15 CM 208.87 Kg/M3 G.25a.25 772,819.00 2,585,810.60 3,358,629.60
PEMBESIAN UNTUK BALOK 20/35 217.71 Kg/M3 G.25a.26 805,527.00 2,695,249.80 3,500,776.80
PEMBESIAN UNTUK BALOK 25/40 204.60 Kg/M3 G.25a.27 757,020.00 2,532,948.00 3,289,968.00
PEMBESIAN UNTUK BALOK 25/45 198.04 Kg/M3 G.25a.28 732,748.00 2,451,735.20 3,184,483.20
PEMBESIAN UNTUK BALOK 30/55 187.27 Kg/M3 G.25a.29 692,899.00 2,318,402.60 3,011,301.60
PEMBESIAN UNTUK KOLOM 15/15 211.56 Kg/M3 G.25a.30 782,772.00 2,619,112.80 3,401,884.80
PEMBESIAN UNTUK KOLOM 15/20 226.00 Kg/M3 G.25a.31 836,200.00 2,797,880.00 3,634,080.00
PEMBESIAN UNTUK KOLOM 15/25 187.20 Kg/M3 G.25a.32 692,640.00 2,317,536.00 3,010,176.00
PEMBESIAN UNTUK KOLOM 15/30 200.89 Kg/M3 G.25a.33 743,293.00 2,487,018.20 3,230,311.20
PEMBESIAN UNTUK KOLOM 20/30 200.67 Kg/M3 G.25a.34 742,479.00 2,484,294.60 3,226,773.60
PEMBESIAN UNTUK KOLOM 30/40 184.00 Kg/M3 G.25a.35 680,800.00 2,277,920.00 2,958,720.00
PEMBESIAN UNTUK KOLOM 50/50 176.24 Kg/M3 G.25a.36 652,088.00 2,181,851.20 2,833,939.20
PEMBESIAN UNTUK KOLOM 35/35 180.25 Kg/M3 G.25a.37 666,925.00 2,231,495.00 2,898,420.00
PEMBESIAN UNTUK KOLOM 45/45 176.20 Kg/M3 G.25a.38 651,940.00 2,181,356.00 2,833,296.00
PEMBESIAN UTK PLAT LISTPLANK, KANOPI T.8 CM 83.13 Kg/M3 G.25a.39 307,581.00 1,029,149.40 1,336,730.40
5 1 M2 PASANG BEKISTING PAPAN G.29. 39,250.00 77,246.95 116,496.95
BEKISTING UNTUK 1 M3 SLOOF 15/20 13.33 M2 G.29a. 366,241.75 676,927.66 1,043,169.41
BEKISTING UNTUK 1 M3 SLOOF 15/25 13.33 M2 G.29b. 366,241.75 676,927.66 1,043,169.41
BEKISTING UNTUK 1 M3 SLOOF 20/25 10.00 M2 G.29c. 274,750.00 507,822.70 782,572.70
BEKISTING UNTUK 1 M3 SLOOF 20/30 10.00 M2 G.29d. 274,750.00 507,822.70 782,572.70
BEKISTING UNTUK 1 M3 KOLOM PRAKTIS 12/12 16.67 M2 G.29e. 458,008.25 846,540.44 1,304,548.69
BEKISTING UNTUK 1 M3 KOLOM 20/20 20.00 M2 G.29f. 549,500.00 1,015,645.40 1,565,145.40
BEKISTING UNTUK 1 M3 KOLOM 20/25 18.00 M2 G.29g. 494,550.00 914,080.86 1,408,630.86
BEKISTING UNTUK 1 M3 KOLOM 25/25 16.00 M2 G.29h. 439,600.00 812,516.32 1,252,116.32
BEKISTING UNTUK 1 M3 KOLOM 25/30 14.67 M2 G.29i. 403,058.25 744,975.90 1,148,034.15
BEKISTING UNTUK 1 M3 KOLOM 30/30 13.33 M2 G.29j. 366,241.75 676,927.66 1,043,169.41
BEKISTING UNTUK 1 M3 KOLOM 30/35 12.38 M2 G.29k. 340,140.50 628,684.50 968,825.00
BEKISTING UNTUK 1 M3 KOLOM 40/40 10.00 M2 G.29l. 274,750.00 507,822.70 782,572.70
BEKISTING UNTUK 1 M3 BALOK 15/20 13.33 M2 G.29m. 366,241.75 676,927.66 1,043,169.41
BEKISTING UNTUK 1 M3 BALOK 15/25 17.33 M2 G.29n. 476,141.75 880,056.74 1,356,198.49
BEKISTING UNTUK 1 M3 BALOK 15/30 16.67 M2 G.29o. 457,870.88 846,286.53 1,304,157.40
BEKISTING UNTUK BALOK LATEI 10/10 20.00 M2 G.29p. 549,500.00 1,015,645.40 1,565,145.40
BEKISTING UNTUK PLAT DAK BETON T.12 CM 8.33 M2 G.29q. 228,866.75 423,016.31 651,883.06
BEKISTING UNTUK PLAT DAK BETON T.10 CM 10.00 M2 G.29q1 274,750.00 507,822.70 782,572.70
BEKISTING UNTUK BALOK 20/30 13.33 M2 G.29r. 366,241.75 516,761.35 883,003.10
BEKISTING UNTUK BALOK 20/40 12.50 M2 G.29s. 343,437.50 634,778.38 978,215.88
BEKISTNG UNTUK BALOK 25/50 10.00 M2 G.29t. 274,750.00 507,822.70 782,572.70
BEKISTING UNTUK BALOK 30/60 8.33 M2 G.29u. 228,866.75 423,016.31 651,883.06
BEKISTING UNTUK PONDASI POOR 6.47 M2 G.29v. 177,763.25 328,561.29 506,324.54
BEKISTING UNTUK PONDASI PLAT T.20 CM 4.00 M2 G.29w. 109,900.00 203,129.08 313,029.08
BEKISTING UNTUK PONDASI PLAT T.25 CM 4.00 M2 G.29x. 109,900.00 203,129.08 313,029.08
BEKISTING UNTUK PONDASI PLAT T.15 CM 4.00 M2 G.29y. 109,900.00 203,129.08 313,029.08
BEKISTING UNTUK BALOK 20/35 12.86 M2 G.29z. 353,328.50 653,059.99 1,006,388.49
BEKISTING UNTUK BALOK 25/40 10.50 M2 G.29z.1 288,487.50 533,213.84 821,701.34
BEKISTING UNTUK BALOK 25/45 10.22 M2 G.29z.2 280,794.50 518,994.80 799,789.30
BEKISTING UNTUK BALOK 30/55 8.49 M2 G.29z.3 233,262.75 431,141.47 664,404.22
BEKISTING UNTUK KOLOM 15/15 26.67 M2 G.29z.4 732,758.25 1,354,363.14 2,087,121.39
BEKISTING UNTUK KOLOM 15/20 23.33 M2 G.29z.5 640,991.75 1,184,750.36 1,825,742.11
BEKISTING UNTUK KOLOM 15/25 21.33 M2 G.29z.6 586,041.75 1,083,185.82 1,669,227.57
BEKISTING UNTUK KOLOM 15/30 20.00 M2 G.29z.7 549,500.00 1,015,645.40 1,565,145.40
BEKISTING UNTUK KOLOM 20/30 16.67 M2 G.29z.8 458,008.25 846,540.44 1,304,548.69
BEKISTING UNTUK KOLOM 30/40 11.67 M2 G.29z.9 320,633.25 592,629.09 913,262.34
BEKISTING UNTUK KOLOM 50/50 8.00 M2 G.29z.10 219,800.00 406,258.16 626,058.16
BEKISTING UNTUK KOLOM 35/35 11.43 M2 G.29z.11 314,039.25 580,441.35 894,480.60
BEKISTING UNTUK KOLOM 45/45 8.89 M2 G.29z.12 244,252.75 451,454.38 695,707.13
BEKISTING UTK PLAT LISTPLANK, KANOPI T.8 CM 12.50 M2 G.29z.13 343,437.50 634,778.38 978,215.88
MUTU BETON SITE MIX K.175
MENGERJAKAN UNTUK SLOOF 15/20 166.67 Kg/M3 G.4a + G.25a.1 + G.29a. 1,109,720.75 3,603,602.26 4,713,323.01
MENGERJAKAN UNTUK SLOOF 15/25 163.47 Kg/M3 G.4a + G.25a.2 + G.29b. 1,097,880.75 3,563,986.26 4,661,867.01
MENGERJAKAN UNTUK SLOOF 20/25 140.40 Kg/M3 G.4a + G.25a.3 + G.29c. 921,030.00 3,109,274.70 4,030,304.70
MENGERJAKAN UNTUK SLOOF 20/30 125.00 Kg/M3 G.4a + G.25a.4 + G.29d. 864,050.00 2,918,622.70 3,782,672.70
MENGERJAKAN UNTUK KOLOM PRAKTIS 12/12 235.42 Kg/M3 G.4a + G.25a.5 + G.29e. 1,455,862.25 4,624,340.04 6,080,202.29

HARGA SATUAN PEKERJAAN Halaman 19


KODE HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN
ANALISA UPAH (Rp.) BAHAN (Rp.) ALAT (Rp.) (Rp.)
1 2 3 4 5 6 7=(4+5+6)
MENGERJAKAN UNTUK KOLOM 20/20 200.00 Kg/M3 G.4a + G.25a.6 + G.29f. 1,416,300.00 4,354,945.40 5,771,245.40
MENGERJAKAN UNTUK KOLOM 20/25 180.80 Kg/M3 G.4a + G.25a.7 + G.29g. 1,290,310.00 4,015,684.86 5,305,994.86
MENGERJAKAN UNTUK KOLOM 25/25 192.64 Kg/M3 G.4a + G.25a.8 + G.29h. 1,279,168.00 4,060,699.52 5,339,867.52
MENGERJAKAN UNTUK KOLOM 25/30 200.53 Kg/M3 G.4a + G.25a.9 + G.29i. 1,271,819.25 4,090,837.30 5,362,656.55
MENGERJAKAN UNTUK KOLOM 30/30 172.44 Kg/M3 G.4a + G.25a.10 + G.29j. 1,131,069.75 3,675,034.86 4,806,104.61
MENGERJAKAN UNTUK KOLOM 30/35 179.43 Kg/M3 G.4a + G.25a.11 + G.29k. 1,130,831.50 3,713,327.90 4,844,159.40
MENGERJAKAN UNTUK KOLOM 40/40 180.50 Kg/M3 G.4a + G.25a.12 + G.29l. 1,069,400.00 3,605,712.70 4,675,112.70
MENGERJAKAN UNTUK RINGBALK 15/20 166.67 Kg/M3 G.4a + G.25a.13 + G.29m. 1,109,720.75 3,603,602.26 4,713,323.01
MENGERJAKAN UNTUK RINGBALK 15/25 163.47 Kg/M3 G.4a + G.25a.14 + G.29n. 1,207,780.75 3,767,115.34 4,974,896.09
MENGERJAKAN UNTUK BALOK KONSOL15/30 200.89 Kg/M3 G.4a + G.25a.15 + G.29o. 1,327,963.88 4,196,604.73 5,524,568.60
MENGERJAKAN UNTUK BALOK LATEI 12/12 320.00 Kg/M3 G.4a + G.25a.16 + G.29p. 1,860,300.00 5,840,545.40 7,700,845.40
MENGERJAKAN UNTUK PLAT DAK BETON T.12 CM 152.42 Kg/M3 G.4a + G.25a.17 + G.29q. 919,620.75 3,173,275.91 4,092,896.66
MENGERJAKAN UNTUK PLAT DAK BETON T.10 CM 119.10 Kg/M3 G.4a + G.25a.17a + G.29q1 842,220.00 2,845,580.70 3,687,800.70
MENGERJAKAN UNTUK BALOK 20/30 190.00 Kg/M3 G.4a + G.25a.18 + G.29r. 824,532.42 2,489,211.20 3,313,743.62
MENGERJAKAN UNTUK BALOK 20/40 213.25 Kg/M3 G.4a + G.25a.19 + G.29s. 1,259,262.50 4,138,113.38 5,397,375.88
MENGERJAKAN UNTUK BALOK 25/50 192.80 Kg/M3 G.4a + G.25a.20 + G.29t. 1,114,910.00 3,757,986.70 4,872,896.70
MENGERJAKAN UNTUK BALOK 30/60 190.56 Kg/M3 G.4a + G.25a.21 + G.29u. 1,060,738.75 3,645,449.11 4,706,187.86
MENGERJAKAN UNTUK PONDASI POOR 105.00 Kg/M3 G.4a + G.25a.22 + G.29v. 693,063.25 2,491,761.29 3,184,824.54
MENGERJAKAN UNTUK PONDASI PLAT T.20 CM 166.00 Kg/M3 G.4a + G.25a.23 + G.29w. 850,900.00 3,121,509.08 3,972,409.08
MENGERJAKAN UNTUK PONDASI PLAT T.25 CM 137.80 Kg/M3 G.4a + G.25a.24 + G.29x. 746,560.00 2,772,393.08 3,518,953.08
MENGERJAKAN UNTUK PONDASI PLAT T.15 CM 208.87 Kg/M3 G.4a + G.25a.25 + G.29y. 1,009,519.00 3,652,239.68 4,661,758.68
MENGERJAKAN UNTUK BALOK 20/35 217.71 Kg/M3 G.4a + G.25a.26 + G.29z. 1,285,655.50 4,211,609.79 5,497,265.29
MENGERJAKAN UNTUK BALOK 25/40 204.60 Kg/M3 G.4a + G.25a.27 + G.29z.1 1,172,307.50 3,929,461.84 5,101,769.34
MENGERJAKAN UNTUK BALOK 25/45 198.04 Kg/M3 G.4a + G.25a.28 + G.29z.2 1,140,342.50 3,834,030.00 4,974,372.50
MENGERJAKAN UNTUK BALOK 30/55 187.27 Kg/M3 G.4a + G.25a.29 + G.29z.3 1,052,961.75 3,612,844.07 4,665,805.82
MENGERJAKAN UNTUK KOLOM 15/15 211.56 Kg/M3 G.4a + G.25a.30 + G.29z.4 1,642,330.25 4,836,775.94 6,479,106.19
MENGERJAKAN UNTUK KOLOM 15/20 226.00 Kg/M3 G.4a + G.25a.31 + G.29z.5 1,603,991.75 4,845,930.36 6,449,922.11
MENGERJAKAN UNTUK KOLOM 15/25 187.20 Kg/M3 G.4a + G.25a.32 + G.29z.6 1,405,481.75 4,264,021.82 5,669,503.57
MENGERJAKAN UNTUK KOLOM 15/30 200.89 Kg/M3 G.4a + G.25a.33 + G.29z.7 1,419,593.00 4,365,963.60 5,785,556.60
MENGERJAKAN UNTUK KOLOM 20/30 200.67 Kg/M3 G.4a + G.25a.34 + G.29z.8 1,327,287.25 4,194,135.04 5,521,422.29
MENGERJAKAN UNTUK KOLOM 30/40 184.00 Kg/M3 G.4a + G.25a.35 + G.29z.9 1,128,233.25 3,733,849.09 4,862,082.34
MENGERJAKAN UNTUK KOLOM 50/50 176.24 Kg/M3 G.4a + G.25a.36 + G.29z.10 998,688.00 3,451,409.36 4,450,097.36
MENGERJAKAN UNTUK KOLOM 35/35 180.25 Kg/M3 G.4a + G.25a.37 + G.29z.11 1,107,764.25 3,675,236.35 4,783,000.60
MENGERJAKAN UNTUK KOLOM 45/45 176.20 Kg/M3 G.4a + G.25a.38 + G.29z.12 1,022,992.75 3,496,110.38 4,519,103.13
MENGERJAKAN UTK PLAT LISTPLANK, KANOPI T.8 CM 83.13 Kg/M3 G.4a + G.25a.39 + G.29z.13 777,818.50 2,527,227.78 3,305,046.28
MUTU BETON SITE MIX K.225
MENGERJAKAN UNTUK SLOOF 15/20 166.67 Kg/M3 G.4b + G.25a.1 + G.29a. 1,109,720.75 3,666,102.26 4,775,823.01
MENGERJAKAN UNTUK SLOOF 15/25 163.47 Kg/M3 G.4b + G.25a.2 + G.29b. 1,097,880.75 3,626,486.26 4,724,367.01
MENGERJAKAN UNTUK SLOOF 20/25 140.40 Kg/M3 G.4b + G.25a.3 + G.29c. 921,030.00 3,171,774.70 4,092,804.70
MENGERJAKAN UNTUK SLOOF 20/30 125.00 Kg/M3 G.4b + G.25a.4 + G.29d. 864,050.00 2,981,122.70 3,845,172.70
MENGERJAKAN UNTUK KOLOM PRAKTIS 12/12 235.42 Kg/M3 G.4b + G.25a.5 + G.29e. 1,455,862.25 4,686,840.04 6,142,702.29
MENGERJAKAN UNTUK KOLOM 20/20 200.00 Kg/M3 G.4b + G.25a.6 + G.29f. 1,416,300.00 4,417,445.40 5,833,745.40
MENGERJAKAN UNTUK KOLOM 25/25 180.80 Kg/M3 G.4b + G.25a.7 + G.29g. 1,290,310.00 4,078,184.86 5,368,494.86
MENGERJAKAN UNTUK KOLOM 25/25 192.64 Kg/M3 G.4b + G.25a.8 + G.29h. 1,279,168.00 4,123,199.52 5,402,367.52
MENGERJAKAN UNTUK KOLOM 25/30 200.53 Kg/M3 G.4b + G.25a.9 + G.29i. 1,271,819.25 4,153,337.30 5,425,156.55
MENGERJAKAN UNTUK KOLOM 30/30 172.44 Kg/M3 G.4b + G.25a.10 + G.29j. 1,131,069.75 3,737,534.86 4,868,604.61
MENGERJAKAN UNTUK KOLOM 30/35 179.43 Kg/M3 G.4b + G.25a.11 + G.29k. 1,130,831.50 3,775,827.90 4,906,659.40
MENGERJAKAN UNTUK KOLOM 40/40 180.50 Kg/M3 G.4b + G.25a.12 + G.29l. 1,069,400.00 3,668,212.70 4,737,612.70
MENGERJAKAN UNTUK RINGBALK 15/20 166.67 Kg/M3 G.4b + G.25a.13 + G.29m. 1,109,720.75 3,666,102.26 4,775,823.01
MENGERJAKAN UNTUK RINGBALK 15/25 163.47 Kg/M3 G.4b + G.25a.14 + G.29n. 1,207,780.75 3,829,615.34 5,037,396.09
MENGERJAKAN UNTUK BALOK KONSOL15/30 200.89 Kg/M3 G.4b + G.25a.15 + G.29o. 1,327,963.88 4,259,104.73 5,587,068.60
MENGERJAKAN UNTUK BALOK LATEI 12/12 320.00 Kg/M3 G.4b + G.25a.16 + G.29p. 1,860,300.00 5,903,045.40 7,763,345.40
MENGERJAKAN UNTUK PLAT DAK BETON T.12 CM 152.42 Kg/M3 G.4b + G.25a.17 + G.29q. 919,620.75 3,235,775.91 4,155,396.66
MENGERJAKAN UNTUK PLAT DAK BETON T.10 CM 119.10 Kg/M3 G.4b + G.25a.17a + G.29q1 842,220.00 2,908,080.70 3,750,300.70
MENGERJAKAN UNTUK BALOK 20/30 190.00 Kg/M3 G.4b + G.25a.18 + G.29r. 842,220.00 2,908,080.70 3,750,300.70
MENGERJAKAN UNTUK BALOK 10/30 89.59 Kg/M3 G.4b + G.25a.18 + G.29r. 824,532.42 2,551,711.20 3,376,243.62
MENGERJAKAN UNTUK BALOK 20/40 213.25 Kg/M3 G.4b + G.25a.19 + G.29s. 1,259,262.50 4,200,613.38 5,459,875.88
MENGERJAKAN UNTUK BALOK 25/50 192.80 Kg/M3 G.4b + G.25a.20 + G.29t. 1,114,910.00 3,820,486.70 4,935,396.70
MENGERJAKAN UNTUK BALOK 30/60 190.56 Kg/M3 G.4b + G.25a.21 + G.29u. 1,060,738.75 3,707,949.11 4,768,687.86
MENGERJAKAN UNTUK PONDASI POOR 105.00 Kg/M3 G.4b + G.25a.22 + G.29v. 693,063.25 2,554,261.29 3,247,324.54
MENGERJAKAN UNTUK PONDASI PLAT T.20 CM 166.00 Kg/M3 G.4b + G.25a.23 + G.29w. 850,900.00 3,184,009.08 4,034,909.08
MENGERJAKAN UNTUK PONDASI PLAT T.25 CM 137.80 Kg/M3 G.4b + G.25a.24 + G.29x. 746,560.00 2,834,893.08 3,581,453.08
MENGERJAKAN UNTUK PONDASI PLAT T.15 CM 208.87 Kg/M3 G.4b + G.25a.25 + G.29y. 1,009,519.00 3,714,739.68 4,724,258.68
MENGERJAKAN UNTUK BALOK 20/35 217.71 Kg/M3 G.4b + G.25a.26 + G.29z. 1,285,655.50 4,274,109.79 5,559,765.29
MENGERJAKAN UNTUK BALOK 25/40 204.60 Kg/M3 G.4b + G.25a.27 + G.29z.1 1,172,307.50 3,991,961.84 5,164,269.34
MENGERJAKAN UNTUK BALOK 25/45 198.04 Kg/M3 G.4b + G.25a.28 + G.29z.2 1,140,342.50 3,896,530.00 5,036,872.50
MENGERJAKAN UNTUK BALOK 30/55 187.27 Kg/M3 G.4b + G.25a.29 + G.29z.3 1,052,961.75 3,675,344.07 4,728,305.82
MENGERJAKAN UNTUK KOLOM 15/15 211.56 Kg/M3 G.4b + G.25a.30 + G.29z.4 1,642,330.25 4,899,275.94 6,541,606.19
MENGERJAKAN UNTUK KOLOM 15/20 226.00 Kg/M3 G.4b + G.25a.31 + G.29z.5 1,603,991.75 4,908,430.36 6,512,422.11
MENGERJAKAN UNTUK KOLOM 15/25 187.20 Kg/M3 G.4b + G.25a.32 + G.29z.6 1,405,481.75 4,326,521.82 5,732,003.57
MENGERJAKAN UNTUK KOLOM 15/30 200.89 Kg/M3 G.4b + G.25a.33 + G.29z.7 1,419,593.00 4,428,463.60 5,848,056.60
MENGERJAKAN UNTUK KOLOM 20/30 200.67 Kg/M3 G.4b + G.25a.34 + G.29z.8 1,327,287.25 4,256,635.04 5,583,922.29
MENGERJAKAN UNTUK KOLOM 30/40 184.00 Kg/M3 G.4b + G.25a.35 + G.29z.9 1,128,233.25 3,796,349.09 4,924,582.34
MENGERJAKAN UNTUK KOLOM 50/50 176.24 Kg/M3 G.4b + G.25a.36 + G.29z.10 998,688.00 3,513,909.36 4,512,597.36
MENGERJAKAN UNTUK KOLOM 35/35 180.25 Kg/M3 G.4b + G.25a.37 + G.29z.11 1,107,764.25 3,737,736.35 4,845,500.60
MENGERJAKAN UNTUK KOLOM 45/45 176.20 Kg/M3 G.4b + G.25a.38 + G.29z.12 1,022,992.75 3,558,610.38 4,581,603.13
MENGERJAKAN UTK PLAT LISTPLANK, KANOPI T.8 CM 83.13 Kg/M3 G.4b + G.25a.39 + G.29z.13 777,818.50 2,589,727.78 3,367,546.28
MUTU BETON READY MIX K.225
MENGERJAKAN UNTUK SLOOF 15/20 166.67 Kg/M3 G.4e+G.25a.1+G.29a 1,156,970.75 3,658,802.26 4,815,773.01

HARGA SATUAN PEKERJAAN Halaman 20


KODE HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN
ANALISA UPAH (Rp.) BAHAN (Rp.) ALAT (Rp.) (Rp.)
1 2 3 4 5 6 7=(4+5+6)
MENGERJAKAN UNTUK SLOOF 15/25 163.47 Kg/M3 G.4e+G.25a.2+G.29b 1,145,130.75 3,619,186.26 4,764,317.01
MENGERJAKAN UNTUK SLOOF 20/25 140.40 Kg/M3 G.4e+G.25a.3+G.29c 968,280.00 3,164,474.70 4,132,754.70
MENGERJAKAN UNTUK SLOOF 20/30 125.00 Kg/M3 G.4e+G.25a.4+G.29d 911,300.00 2,973,822.70 3,885,122.70
MENGERJAKAN UNTUK KOLOM PRAKTIS 12/12 235.42 Kg/M3 G.4e+G.25a.5+G.29e 1,503,112.25 4,679,540.04 6,182,652.29
MENGERJAKAN UNTUK KOLOM 20/20 200.00 Kg/M3 G.4e+G.25a.6+G.29f 1,463,550.00 4,410,145.40 5,873,695.40
MENGERJAKAN UNTUK KOLOM 20/25 180.80 Kg/M3 G.4e+G.25a.7+G.29g 1,337,560.00 4,070,884.86 5,408,444.86
MENGERJAKAN UNTUK KOLOM 25/25 192.64 Kg/M3 G.4e+G.25a.8+G.29h 1,326,418.00 4,115,899.52 5,442,317.52
MENGERJAKAN UNTUK KOLOM 25/30 200.53 Kg/M3 G.4e+G.25a.9+G.29i 1,319,069.25 4,146,037.30 5,465,106.55
MENGERJAKAN UNTUK KOLOM 30/30 172.44 Kg/M3 G.4e+G.25a.10+G.29j 1,178,319.75 3,730,234.86 4,908,554.61
MENGERJAKAN UNTUK KOLOM 30/35 179.43 Kg/M3 G.4e+G.25a.11+G.29k 1,178,081.50 3,768,527.90 4,946,609.40
MENGERJAKAN UNTUK KOLOM 40/40 180.50 Kg/M3 G.4e+G.25a.12+G.29l 1,116,650.00 3,660,912.70 4,777,562.70
MENGERJAKAN UNTUK RINGBALK 15/20 166.67 Kg/M3 G.4e+G.25a.13+G.29m 1,156,970.75 3,658,802.26 4,815,773.01
MENGERJAKAN UNTUK RINGBALK 15/25 163.47 Kg/M3 G.4e+G.25a.14+G.29n 1,255,030.75 3,822,315.34 5,077,346.09
MENGERJAKAN UNTUK BALOK KONSOL15/30 200.89 Kg/M3 G.4e+G.25a.15+G.29o 1,375,213.88 4,251,804.73 5,627,018.60
MENGERJAKAN UNTUK BALOK LATEI 12/12 320.00 Kg/M3 G.4e+G.25a.16+G.29p 1,907,550.00 4,977,245.40 6,884,795.40
MENGERJAKAN UNTUK PLAT DAK BETON T.12 CM 152.42 Kg/M3 G.4e+G.25a.17+G.29q 966,870.75 3,228,475.91 4,195,346.66
MENGERJAKAN UNTUK PLAT DAK BETON T.10 CM 119.10 Kg/M3 G.4e+G.25a.17a+G.29q1 889,470.00 2,900,780.70 3,790,250.70
MENGERJAKAN UNTUK BALOK 20/30 190.00 Kg/M3 G.4e+G.25a.18+G.29r 871,782.42 2,704,577.51 3,576,359.93
MENGERJAKAN UNTUK BALOK 20/40 213.25 Kg/M3 G.4e+G.25a.19+G.29s 1,306,512.50 4,193,313.38 5,499,825.88
MENGERJAKAN UNTUK BALOK 25/50 192.80 Kg/M3 G.4e+G.25a.20+G.29t 1,162,160.00 3,813,186.70 4,975,346.70
MENGERJAKAN UNTUK BALOK 30/60 190.56 Kg/M3 G.4e+G.25a.21+G.29u 1,107,988.75 3,700,649.11 4,808,637.86
MENGERJAKAN UNTUK PONDASI POOR 105.00 Kg/M3 G.4e+G.25a.22+G.29v 740,313.25 2,546,961.29 3,287,274.54
MENGERJAKAN UNTUK PONDASI PLAT T.20 CM 166.00 Kg/M3 G.4e+G.25a.23+G.29w 898,150.00 3,176,709.08 4,074,859.08
MENGERJAKAN UNTUK PONDASI PLAT T.25 CM 137.80 Kg/M3 G.4e+G.25a.24+G.29x 793,810.00 2,827,593.08 3,621,403.08
MENGERJAKAN UNTUK PONDASI PLAT T.15 CM 208.87 Kg/M3 G.4e+G.25a.25+G.29y 1,056,769.00 3,707,439.68 4,764,208.68
MENGERJAKAN UNTUK BALOK 20/35 217.71 Kg/M3 G.4e+G.25a.26+G.29z 1,332,905.50 4,266,809.79 5,599,715.29
MENGERJAKAN UNTUK BALOK 25/40 204.60 Kg/M3 G.4e+G.25a.27+G.29z1 1,219,557.50 3,984,661.84 5,204,219.34
MENGERJAKAN UNTUK BALOK 25/45 198.04 Kg/M3 G.4e+G.25a.28+G.29z2 1,187,592.50 3,889,230.00 5,076,822.50
MENGERJAKAN UNTUK BALOK 30/55 187.27 Kg/M3 G.4e+G.25a.29+G.29z3 1,100,211.75 2,749,544.07 3,849,755.82
MENGERJAKAN UNTUK KOLOM 15/15 211.56 Kg/M3 G.4e+G.25a.30+G.29z4 1,689,580.25 4,891,975.94 6,581,556.19
MENGERJAKAN UNTUK KOLOM 15/20 226.00 Kg/M3 G.4e+G.25a.31+G.29z5 1,477,191.75 4,901,130.36 6,378,322.11
MENGERJAKAN UNTUK KOLOM 15/25 187.20 Kg/M3 G.4e+G.25a.32+G.29z6 1,452,731.75 4,319,221.82 5,771,953.57
MENGERJAKAN UNTUK KOLOM 15/30 200.89 Kg/M3 G.4e+G.25a.33+G.29z7 1,466,843.00 4,421,163.60 5,888,006.60
MENGERJAKAN UNTUK KOLOM 20/30 200.67 Kg/M3 G.4e+G.25a.34+G.29z8 1,374,537.25 4,249,335.04 5,623,872.29
MENGERJAKAN UNTUK KOLOM 30/40 184.00 Kg/M3 G.4e+G.25a.35+G.29z9 1,175,483.25 3,789,049.09 4,964,532.34
MENGERJAKAN UNTUK KOLOM 50/50 176.24 Kg/M3 G.4e+G.25a.36+G.29z10 1,045,938.00 3,506,609.36 4,552,547.36
MENGERJAKAN UNTUK KOLOM 35/35 180.25 Kg/M3 G.4e+G.25a.37+G.29z11 1,155,014.25 3,730,436.35 4,885,450.60
MENGERJAKAN UNTUK KOLOM 45/45 176.20 Kg/M3 G.4e+G.25a.38+G.29z12 1,070,242.75 3,551,310.38 4,621,553.13
MENGERJAKAN UTK PLAT LISTPLANK, KANOPI T.8 CM 83.13 Kg/M3 G.4e+G.25a.39+G.29z13 825,068.50 2,582,427.78 3,407,496.28
16 1 M2 BEGISTING MULTIPLEX 9 MM G.4p. 39,250.00 77,246.95 116,496.95
BEKISTING UNTUK 1 M3 SLOOF 15/20 13.330 M2 G.4p.1 366,241.75 720,791.29 1,087,033.04
BEKISTING UNTUK 1 M3 SLOOF 15/25 13.330 M2 G.4p.2 366,241.75 720,791.29 1,087,033.04
BEKISTING UNTUK 1 M3 SLOOF 20/25 10.000 M2 G.4p.3 274,750.00 540,728.65 815,478.65
BEKISTING UNTUK 1 M3 SLOOF 20/30 10.020 M2 G.4p.4 274,750.00 540,728.65 815,478.65
BEKISTING UNTUK 1 M3 KOLOM PRAKTIS 15/15 13.332 M2 G.4p.5 458,008.25 901,394.66 1,359,402.91
BEKISTING UNTUK 1 M3 KOLOM 20/20 20.000 M2 G.4p.6 549,500.00 1,081,457.30 1,630,957.30
BEKISTING UNTUK 1 M3 KOLOM 20/25 18.000 M2 G.4p.7 494,550.00 973,311.57 1,467,861.57
BEKISTING UNTUK 1 M3 KOLOM 25/25 16.000 M2 G.4p.8 439,600.00 865,165.84 1,304,765.84
BEKISTING UNTUK 1 M3 KOLOM 25/30 14.660 M2 G.4p.9 403,058.25 793,248.93 1,196,307.18
BEKISTING UNTUK 1 M3 KOLOM 30/30 13.330 M2 G.4p.10 366,241.75 720,791.29 1,087,033.04
BEKISTING UNTUK 1 M3 KOLOM 30/35 12.380 M2 G.4p.11 340,140.50 669,422.07 1,009,562.57
BEKISTING UNTUK 1 M3 KOLOM 40/40 10.000 M2 G.4p.12 274,750.00 540,728.65 815,478.65
BEKISTING UNTUK 1 M3 RINGBALK 15/20 13.330 M2 G.4p.13 366,241.75 720,791.29 1,087,033.04
BEKISTING UNTUK 1 M3 RINGBALK 15/25 13.330 M2 G.4p.14 476,141.75 937,082.75 1,413,224.50
BEKISTING UNTUK 1 M3 BALOK KONSOL 15/30 16.665 M2 G.4p.15 457,870.88 901,124.30 1,358,995.17
BEKISTING UNTUK BALOK LATEI 12/12 16.650 M2 G.4p.16 549,500.00 1,081,457.30 1,630,957.30
BEKISTING UNTUK BALOK 20/30 13.330 M2 G.4p.17 228,866.75 450,426.97 679,293.72
BEKISTING UNTUK BALOK 20/40 12.500 M2 G.4p.18 274,750.00 540,728.65 815,478.65
BEKISTNG UNTUK BALOK 25/50 10.000 M2 G.4p.19 366,241.75 720,791.29 1,087,033.04
BEKISTING UNTUK BALOK 30/60 8.400 M2 G.4p.20 343,437.50 675,910.81 1,019,348.31
BEKISTING UNTUK PLAT DAK BETON 8.330 M2 G.4p.21 274,750.00 540,728.65 815,478.65
BEKISTING UNTUK PONDASI POOR 6.470 M2 G.4p.22 228,866.75 450,426.97 679,293.72
BEKISTING UNTUK PONDASI PLAT 170/20 6.470 M2 G.4p.23 177,763.25 349,851.44 527,614.69
BEKISTING UNTUK PONDASI PLAT 150/20 7.660 M2 G.4p.24 109,900.00 216,291.46 326,191.46
BEKISTING UNTUK PONDASI PLAT 120/15 8.880 M2 G.4p.25 109,900.00 216,291.46 326,191.46
17 MUTU BETON SITE MIX K.175 ( dgn bekisting multipleks 9 mm)
MENGERJAKAN UNTUK SLOOF 15/20 (161.40 Kg/M3) 1.000 M3 G.4a + G.25a.1 + G.4p.1 1,109,720.75 3,647,465.89 4,757,186.64
MENGERJAKAN UNTUK SLOOF 15/25 (158.45 Kg/M3) 1.000 M3 G.4a + G.25a.2 + G.4p.2 1,097,880.75 3,607,849.89 4,705,730.64
MENGERJAKAN UNTUK SLOOF 20/25 (140.56 Kg/M3) 1.000 M3 G.4a + G.25a.3 + G.4p.3 921,030.00 3,142,180.65 4,063,210.65
MENGERJAKAN UNTUK SLOOF 20/30 (163.26 Kg/M3) 1.000 M3 G.4a + G.25a.4 + G.4p.4 864,050.00 2,951,528.65 3,815,578.65
MENGERJAKAN UNTUK KOLOM PRAKTIS 15/15 (206.34 Kg/M3) 1.000 M3 G.4a + G.25a.5 + G.4p.5 1,455,862.25 4,679,194.26 6,135,056.51
MENGERJAKAN UNTUK KOLOM 20/20 (195.13 Kg/M3) 1.000 M3 G.4a + G.25a.6 + G.4p.6 1,416,300.00 4,420,757.30 5,837,057.30
MENGERJAKAN UNTUK KOLOM 20/25 (195.89 Kg/M3) 1.000 M3 G.4a + G.25a.7 + G.4p.7 1,290,310.00 4,074,915.57 5,365,225.57
MENGERJAKAN UNTUK KOLOM 25/25 (154.28 Kg/M3) 1.000 M3 G.4a + G.25a.8 + G.4p.8 1,279,168.00 4,113,349.04 5,392,517.04
MENGERJAKAN UNTUK KOLOM 25/30 (205.80 Kg/M3) 1.000 M3 G.4a + G.25a.9 + G.4p.9 1,271,819.25 4,139,110.33 5,410,929.58
MENGERJAKAN UNTUK KOLOM 30/30 (174.93 Kg/M3) 1.000 M3 G.4a + G.25a.10 + G.4p.10 1,131,069.75 3,718,898.49 4,849,968.24
MENGERJAKAN UNTUK KOLOM 30/35 (194.44 Kg/M3) 1.000 M3 G.4a + G.25a.11 + G.4p.11 1,130,831.50 3,754,065.47 4,884,896.97
MENGERJAKAN UNTUK KOLOM 40/40 (246.24 Kg/M3) 1.000 M3 G.4a + G.25a.12 + G.4p.12 1,069,400.00 3,638,618.65 4,708,018.65
MENGERJAKAN UNTUK RINGBALK 15/20 (161.40 Kg/M3) 1.000 M3 G.4a + G.25a.13 + G.4p.13 1,109,720.75 3,647,465.89 4,757,186.64

HARGA SATUAN PEKERJAAN Halaman 21


KODE HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN
ANALISA UPAH (Rp.) BAHAN (Rp.) ALAT (Rp.) (Rp.)
1 2 3 4 5 6 7=(4+5+6)
MENGERJAKAN UNTUK RINGBALK 15/25 (158.45 Kg/M3) 1.000 M3 G.4a + G.25a.14 + G.4p.14 1,207,780.75 3,824,141.35 5,031,922.10
MENGERJAKAN UNTUK BALOK KONSOL15/30 (156.42 Kg/M3) 1.000 M3 G.4a + G.25a.15 + G.4p.15 1,327,963.88 4,251,442.50 5,579,406.37
MENGERJAKAN UNTUK BALOK LATEI 12/12 (293.91 Kg/M3) 1.000 M3 G.4a + G.25a.16 + G.4p.16 1,860,300.00 5,906,357.30 7,766,657.30
MENGERJAKAN UNTUK PLAT DAK BETON 150.51 Kg/M3) 1.000 M3 G.4a + G.25a.17 + G.4p.17 919,620.75 3,200,686.57 4,120,307.32
MENGERJAKAN UNTUK BALOK 20/30 (163.26 Kg/M3) 1.000 M3 G.4a + G.25a.18 + G.4p.18 842,220.00 2,878,486.65 3,720,706.65
MENGERJAKAN UNTUK BALOK 20/40 (181.82 Kg/M3) 1.000 M3 G.4a + G.25a.19 + G.4p.19 824,532.42 2,693,241.14 3,517,773.56
MENGERJAKAN UNTUK BALOK 25/50 (145.74 Kg/M3) 1.000 M3 G.4a + G.25a.20 + G.4p.20 1,259,262.50 4,179,245.81 5,438,508.31
MENGERJAKAN UNTUK BALOK 30/60 (173.26 Kg/M3) 1.000 M3 G.4a + G.25a.21 + G.4p.21 1,114,910.00 3,790,892.65 4,905,802.65
MENGERJAKAN UNTUK PONDASI POOR (105.00 Kg/M3) 1.000 M3 G.4a + G.25a.22 + G.4p.22 1,060,738.75 3,672,859.77 4,733,598.52
MENGERJAKAN UNTUK PONDASI PLAT 170/20 (164.94 Kg/M3) 1.000 M3 G.4a + G.25a.23 + G.4p.23 693,063.25 2,513,051.44 3,206,114.69
MENGERJAKAN UNTUK PONDASI PLAT 150/20 (144.08 Kg/M3) 1.000 M3 G.4a + G.25a.24 + G.4p.24 850,900.00 3,134,671.46 3,985,571.46
MENGERJAKAN UNTUK PONDASI PLAT 120/15 (136.95 Kg/M3) 1.000 M3 G.4a + G.25a.25 + G.4p.25 746,560.00 2,785,555.46 3,532,115.46
18 MUTU BETON SITE MIX K.225 ( dgn bekisting multipleks 9 mm)
MENGERJAKAN UNTUK SLOOF 15/20 (161.40 Kg/M3) 1.000 M3 G.4b + G.25a.1 + G.4p.1 1,109,720.75 3,709,965.89 4,819,686.64
MENGERJAKAN UNTUK SLOOF 15/25 (158.45 Kg/M3) 1.000 M3 G.4b + G.25a.2 + G.4p.2 1,097,880.75 3,670,349.89 4,768,230.64
MENGERJAKAN UNTUK SLOOF 20/25 (140.56 Kg/M3) 1.000 M3 G.4b + G.25a.3 + G.4p.3 921,030.00 3,204,680.65 4,125,710.65
MENGERJAKAN UNTUK SLOOF 20/30 (163.26 Kg/M3) 1.000 M3 G.4b + G.25a.4 + G.4p.4 864,050.00 3,014,028.65 3,878,078.65
MENGERJAKAN UNTUK KOLOM PRAKTIS 15/15 (206.34 Kg/M3) 1.000 M3 G.4b + G.25a.5 + G.4p.5 1,455,862.25 4,741,694.26 6,197,556.51
MENGERJAKAN UNTUK KOLOM 20/20 (195.13 Kg/M3) 1.000 M3 G.4b + G.25a.6 + G.4p.6 1,416,300.00 4,483,257.30 5,899,557.30
MENGERJAKAN UNTUK KOLOM 20/25 (195.89 Kg/M3) 1.000 M3 G.4b + G.25a.7 + G.4p.7 1,290,310.00 4,137,415.57 5,427,725.57
MENGERJAKAN UNTUK KOLOM 25/25 (154.28 Kg/M3) 1.000 M3 G.4b + G.25a.8 + G.4p.8 1,279,168.00 4,175,849.04 5,455,017.04
MENGERJAKAN UNTUK KOLOM 25/30 (205.80 Kg/M3) 1.000 M3 G.4b + G.25a.9 + G.4p.9 1,271,819.25 4,201,610.33 5,473,429.58
MENGERJAKAN UNTUK KOLOM 30/30 (174.93 Kg/M3) 1.000 M3 G.4b + G.25a.10 + G.4p.10 1,131,069.75 3,781,398.49 4,912,468.24
MENGERJAKAN UNTUK KOLOM 30/35 (194.44 Kg/M3) 1.000 M3 G.4b + G.25a.11 + + G.4p.11 1,130,831.50 3,816,565.47 4,947,396.97
MENGERJAKAN UNTUK KOLOM 40/40 (246.24 Kg/M3) 1.000 M3 G.4b + G.25a.12 + G.4p.12 1,069,400.00 3,701,118.65 4,770,518.65
MENGERJAKAN UNTUK RINGBALK 15/20 (161.40 Kg/M3) 1.000 M3 G.4b + G.25a.13 + G.4p.13 1,109,720.75 3,709,965.89 4,819,686.64
MENGERJAKAN UNTUK RINGBALK 15/25 (158.45 Kg/M3) 1.000 M3 G.4b + G.25a.14 + G.4p.14 1,207,780.75 3,886,641.35 5,094,422.10
MENGERJAKAN UNTUK BALOK KONSOL15/30 (156.42 Kg/M3) 1.000 M3 G.4b + G.25a.15 + G.4p.15 1,327,963.88 4,313,942.50 5,641,906.37
MENGERJAKAN UNTUK BALOK LATEI 12/12 (293.91 Kg/M3) 1.000 M3 G.4b + G.25a.16 + G.4p.16 1,860,300.00 5,968,857.30 7,829,157.30
MENGERJAKAN UNTUK PLAT DAK BETON 150.51 Kg/M3) 1.000 M3 G.4b + G.25a.17 + G.4p.17 919,620.75 3,263,186.57 4,182,807.32
MENGERJAKAN UNTUK BALOK 20/30 (163.26 Kg/M3) 1.000 M3 G.4b + G.25a.18 + G.4p.18 842,220.00 2,940,986.65 3,783,206.65
MENGERJAKAN UNTUK BALOK 20/40 (181.82 Kg/M3) 1.000 M3 G.4b + G.25a.19 + G.4p.19 824,532.42 2,755,741.14 3,580,273.56
MENGERJAKAN UNTUK BALOK 25/50 (145.74 Kg/M3) 1.000 M3 G.4b + G.25a.20 + G.4p.20 1,259,262.50 4,241,745.81 5,501,008.31
MENGERJAKAN UNTUK BALOK 30/60 (173.26 Kg/M3) 1.000 M3 G.4b + G.25a.21 + G.4p.21 1,114,910.00 3,853,392.65 4,968,302.65
MENGERJAKAN UNTUK PONDASI POOR (105.00 Kg/M3) 1.000 M3 G.4b + G.25a.22 + G.4p.22 1,060,738.75 3,735,359.77 4,796,098.52
MENGERJAKAN UNTUK PONDASI PLAT 170/20 (164.94 Kg/M3) 1.000 M3 G.4b + G.25a.23 + G.4p.23 693,063.25 2,575,551.44 3,268,614.69
MENGERJAKAN UNTUK PONDASI PLAT 150/20 (144.08 Kg/M3) 1.000 M3 G.4b + G.25a.24 + G.4p.24 850,900.00 3,197,171.46 4,048,071.46
MENGERJAKAN UNTUK PONDASI PLAT 120/15 (136.95 Kg/M3) 1.000 M3 G.4b + G.25a.25 + G.4p.25 746,560.00 2,848,055.46 3,594,615.46
19 MUTU BETON READY MIX K.225 ( dgn bekisting multipleks 9 mm)
MENGERJAKAN UNTUK SLOOF 15/20 (161.40 Kg/M3) 1.000 M3 G.4e + G.25a.1 + G.4p.1 1,156,970.75 3,702,665.89 4,859,636.64
MENGERJAKAN UNTUK SLOOF 15/25 (158.45 Kg/M3) 1.000 M3 G.4e + G.25a.2 + G.4p.2 1,145,130.75 3,663,049.89 4,808,180.64
MENGERJAKAN UNTUK SLOOF 20/25 (140.56 Kg/M3) 1.000 M3 G.4e + G.25a.3 + G.4p.3 968,280.00 3,197,380.65 4,165,660.65
MENGERJAKAN UNTUK SLOOF 20/30 (163.26 Kg/M3) 1.000 M3 G.4e + G.25a.4 + G.4p.4 911,300.00 3,006,728.65 3,918,028.65
MENGERJAKAN UNTUK KOLOM PRAKTIS 15/15 (206.34 Kg/M3) 1.000 M3 G.4e + G.25a.5 + G.4p.5 1,503,112.25 4,734,394.26 6,237,506.51
MENGERJAKAN UNTUK KOLOM 20/20 (195.13 Kg/M3) 1.000 M3 G.4e + G.25a.6 + G.4p.6 1,463,550.00 4,475,957.30 5,939,507.30
MENGERJAKAN UNTUK KOLOM 20/25 (195.89 Kg/M3) 1.000 M3 G.4e + G.25a.7 + G.4p.7 1,337,560.00 4,130,115.57 5,467,675.57
MENGERJAKAN UNTUK KOLOM 25/25 (154.28 Kg/M3) 1.000 M3 G.4e + G.25a.8 + G.4p.8 1,326,418.00 4,168,549.04 5,494,967.04
MENGERJAKAN UNTUK KOLOM 25/30 (205.80 Kg/M3) 1.000 M3 G.4e + G.25a.9 + G.4p.9 1,319,069.25 4,194,310.33 5,513,379.58
MENGERJAKAN UNTUK KOLOM 30/30 (174.93 Kg/M3) 1.000 M3 G.4e + G.25a.10 + G.4p.10 1,178,319.75 3,774,098.49 4,952,418.24
MENGERJAKAN UNTUK KOLOM 30/35 (194.44 Kg/M3) 1.000 M3 G.4e + G.25a.11 + G.4p.11 1,178,081.50 3,809,265.47 4,987,346.97
MENGERJAKAN UNTUK KOLOM 40/40 (246.24 Kg/M3) 1.000 M3 G.4e + G.25a.12 + G.4p.12 1,116,650.00 3,693,818.65 4,810,468.65
MENGERJAKAN UNTUK RINGBALK 15/20 (161.40 Kg/M3) 1.000 M3 G.4e + G.25a.13 + G.4p.13 1,156,970.75 3,702,665.89 4,859,636.64
MENGERJAKAN UNTUK RINGBALK 15/25 (158.45 Kg/M3) 1.000 M3 G.4e + G.25a.14 + G.4p.14 1,255,030.75 3,879,341.35 5,134,372.10
MENGERJAKAN UNTUK BALOK KONSOL15/30 (156.42 Kg/M3) 1.000 M3 G.4e + G.25a.15 + G.4p.15 1,375,213.88 4,306,642.50 5,681,856.37
MENGERJAKAN UNTUK BALOK LATEI 12/12 (293.91 Kg/M3) 1.000 M3 G.4e + G.25a.16 + G.4p.16 1,907,550.00 5,961,557.30 7,869,107.30
MENGERJAKAN UNTUK PLAT DAK BETON 150.51 Kg/M3) 1.000 M3 G.4e + G.25a.17 + G.4p.17 966,870.75 3,255,886.57 4,222,757.32
MENGERJAKAN UNTUK BALOK 20/30 (163.26 Kg/M3) 1.000 M3 G.4e + G.25a.18 + G.4p.18 889,470.00 2,933,686.65 3,823,156.65
MENGERJAKAN UNTUK BALOK 20/40 (181.82 Kg/M3) 1.000 M3 G.4e + G.25a.19 + G.4p.19 871,782.42 2,748,441.14 3,620,223.56
MENGERJAKAN UNTUK BALOK 25/50 (145.74 Kg/M3) 1.000 M3 G.4e + G.25a.20 + G.4p.20 1,306,512.50 4,234,445.81 5,540,958.31
MENGERJAKAN UNTUK BALOK 30/60 (173.26 Kg/M3) 1.000 M3 G.4e + G.25a.21 + G.4p.21 1,162,160.00 3,846,092.65 5,008,252.65
MENGERJAKAN UNTUK PONDASI POOR (105.00 Kg/M3) 1.000 M3 G.4e + G.25a.22 + G.4p.22 1,107,988.75 3,728,059.77 4,836,048.52
MENGERJAKAN UNTUK PONDASI PLAT 170/20 (164.94 Kg/M3) 1.000 M3 G.4e + G.25a.23 + G.4p.23 740,313.25 2,568,251.44 3,308,564.69
MENGERJAKAN UNTUK PONDASI PLAT 150/20 (144.08 Kg/M3) 1.000 M3 G.4e + G.25a.24 + G.4p.24 898,150.00 3,189,871.46 4,088,021.46
MENGERJAKAN UNTUK PONDASI PLAT 120/15 (136.95 Kg/M3) 1.000 M3 G.4e + G.25a.25 + G.4p.25 793,810.00 2,840,755.46 3,634,565.46

16 1 M2 BEGISTING MULTIPLEX 12 MM 39,250.00 91,274.43 130,524.43


BEKISTING UNTUK 1 M3 SLOOF 15/20 13.330 M2 366,241.75 851,681.66 1,217,923.41
BEKISTING UNTUK 1 M3 SLOOF 15/25 13.330 M2 366,241.75 851,681.66 1,217,923.41
BEKISTING UNTUK 1 M3 SLOOF 20/25 10.000 M2 366,241.75 851,681.66 1,217,923.41
BEKISTING UNTUK 1 M3 SLOOF 20/30 10.020 M2 274,750.00 638,920.98 913,670.98
BEKISTING UNTUK 1 M3 KOLOM PRAKTIS 15/15 13.332 M2 274,750.00 638,920.98 913,670.98
BEKISTING UNTUK 1 M3 KOLOM 20/20 20.000 M2 458,008.25 1,065,081.27 1,523,089.52
BEKISTING UNTUK 1 M3 KOLOM 20/25 18.000 M2 549,500.00 1,277,841.95 1,827,341.95
BEKISTING UNTUK 1 M3 KOLOM 25/25 16.000 M2 494,550.00 1,150,057.76 1,644,607.76
BEKISTING UNTUK 1 M3 KOLOM 25/30 14.660 M2 439,600.00 1,022,273.56 1,461,873.56
BEKISTING UNTUK 1 M3 KOLOM 30/30 13.330 M2 403,058.25 937,297.07 1,340,355.32
BEKISTING UNTUK 1 M3 KOLOM 30/35 12.380 M2 366,241.75 851,681.66 1,217,923.41
BEKISTING UNTUK 1 M3 KOLOM 40/40 10.000 M2 340,140.50 790,984.17 1,131,124.67
BEKISTING UNTUK 1 M3 RINGBALK 15/20 13.330 M2 274,750.00 638,920.98 913,670.98

HARGA SATUAN PEKERJAAN Halaman 22


KODE HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN
ANALISA UPAH (Rp.) BAHAN (Rp.) ALAT (Rp.) (Rp.)
1 2 3 4 5 6 7=(4+5+6)
BEKISTING UNTUK 1 M3 RINGBALK 15/25 13.330 M2 366,241.75 851,681.66 1,217,923.41
BEKISTING UNTUK 1 M3 BALOK KONSOL 15/30 16.665 M2 476,141.75 1,107,250.05 1,583,391.80
BEKISTING UNTUK BALOK LATEI 12/12 16.650 M2 457,870.88 1,064,761.80 1,522,632.68
BEKISTING UNTUK BALOK 20/30 13.330 M2 549,500.00 1,277,841.95 1,827,341.95
BEKISTING UNTUK BALOK 20/40 12.500 M2 228,866.75 532,221.17 761,087.92
BEKISTNG UNTUK BALOK 25/50 10.000 M2 274,750.00 638,920.98 913,670.98
BEKISTING UNTUK BALOK 30/60 8.400 M2 366,241.75 851,681.66 1,217,923.41
BEKISTING UNTUK PLAT DAK BETON 8.330 M2 343,437.50 798,651.22 1,142,088.72
BEKISTING UNTUK PONDASI POOR 6.470 M2 274,750.00 638,920.98 913,670.98
BEKISTING UNTUK PONDASI PLAT 170/20 6.470 M2 228,866.75 532,221.17 761,087.92
BEKISTING UNTUK PONDASI PLAT 150/20 7.660 M2 177,763.25 413,381.87 591,145.12
BEKISTING UNTUK PONDASI PLAT 120/15 8.880 M2 109,900.00 255,568.39 365,468.39
17 MUTU BETON SITE MIX K.175 ( dgn bekisting multipleks 12 mm)
MENGERJAKAN UNTUK SLOOF 15/20 (161.40 Kg/M3) 1.000 M3 G.4a + G.25a.1 G.4q1 1,109,720.75 8,573,852.15 9,683,572.90
MENGERJAKAN UNTUK SLOOF 15/25 (158.45 Kg/M3) 1.000 M3 G.4a + G.25a.2 G.4q2 1,097,880.75 3,738,740.26 4,836,621.01
MENGERJAKAN UNTUK SLOOF 20/25 (140.56 Kg/M3) 1.000 M3 G.4a + G.25a.3 G.4q3 1,012,521.75 3,453,133.66 4,465,655.41
MENGERJAKAN UNTUK SLOOF 20/30 (163.26 Kg/M3) 1.000 M3 G.4a + G.25a.4 G.4q4 864,050.00 3,049,720.98 3,913,770.98
MENGERJAKAN UNTUK KOLOM PRAKTIS 15/15 (206.34 Kg/M3) 1.000 M3 G.4a + G.25a.5 G.4q5 1,272,604.00 4,416,720.58 5,689,324.58
MENGERJAKAN UNTUK KOLOM 20/20 (195.13 Kg/M3) 1.000 M3 G.4a + G.25a.6 G.4q6 1,324,808.25 4,404,381.27 5,729,189.52
MENGERJAKAN UNTUK KOLOM 20/25 (195.89 Kg/M3) 1.000 M3 G.4a + G.25a.7 G.4q7 1,345,260.00 4,379,445.95 5,724,705.95
MENGERJAKAN UNTUK KOLOM 25/25 (154.28 Kg/M3) 1.000 M3 G.4a + G.25a.8 G.4q8 1,334,118.00 4,398,240.96 5,732,358.96
MENGERJAKAN UNTUK KOLOM 25/30 (205.80 Kg/M3) 1.000 M3 G.4a + G.25a.9 G.4q9 1,308,361.00 4,368,134.96 5,676,495.96
MENGERJAKAN UNTUK KOLOM 30/30 (174.93 Kg/M3) 1.000 M3 G.4a + G.25a.10 G.4q10 1,167,886.25 3,935,404.27 5,103,290.52
MENGERJAKAN UNTUK KOLOM 30/35 (194.44 Kg/M3) 1.000 M3 G.4a + G.25a.11 G.4q11 1,156,932.75 3,936,325.06 5,093,257.81
MENGERJAKAN UNTUK KOLOM 40/40 (246.24 Kg/M3) 1.000 M3 G.4a + G.25a.12 G.4q12 1,134,790.50 3,888,874.17 5,023,664.67
MENGERJAKAN UNTUK RINGBALK 15/20 (161.40 Kg/M3) 1.000 M3 G.4a + G.25a.13 G.4q13 1,018,229.00 3,565,595.58 4,583,824.58
MENGERJAKAN UNTUK RINGBALK 15/25 (158.45 Kg/M3) 1.000 M3 G.4a + G.25a.14 G.4q14 1,097,880.75 3,738,740.26 4,836,621.01
MENGERJAKAN UNTUK BALOK KONSOL15/30 (156.42 Kg/M3) 1.000 M3 G.4a + G.25a.15 G.4q15 1,346,234.75 4,457,568.25 5,803,803.00
MENGERJAKAN UNTUK BALOK LATEI 12/12 (293.91 Kg/M3) 1.000 M3 G.4a + G.25a.16 G.4q16 1,768,670.88 5,889,661.80 7,658,332.68
MENGERJAKAN UNTUK PLAT DAK BETON 150.51 Kg/M3) 1.000 M3 G.4a + G.25a.17 G.4q17 1,240,254.00 4,028,101.55 5,268,355.55
MENGERJAKAN UNTUK BALOK 20/30 (163.26 Kg/M3) 1.000 M3 G.4a + G.25a.18 G.4q18 796,336.75 2,869,979.17 3,666,315.92
MENGERJAKAN UNTUK BALOK 20/40 (181.82 Kg/M3) 1.000 M3 G.4a + G.25a.19 G.4q19 733,040.67 2,611,370.83 3,344,411.49
MENGERJAKAN UNTUK BALOK 25/50 (145.74 Kg/M3) 1.000 M3 G.4a + G.25a.20 G.4q20 1,282,066.75 4,355,016.66 5,637,083.41
MENGERJAKAN UNTUK BALOK 30/60 (173.26 Kg/M3) 1.000 M3 G.4a + G.25a.21 G.4q21 1,183,597.50 4,048,815.22 5,232,412.72
MENGERJAKAN UNTUK PONDASI POOR (105.00 Kg/M3) 1.000 M3 G.4a + G.25a.22 G.4q22 1,106,622.00 3,861,353.78 4,967,975.78
MENGERJAKAN UNTUK PONDASI PLAT 170/20 (164.94 Kg/M3) 1.000 M3 G.4a + G.25a.23 G.4q23 744,166.75 2,695,421.17 3,439,587.92
MENGERJAKAN UNTUK PONDASI PLAT 150/20 (144.08 Kg/M3) 1.000 M3 G.4a + G.25a.24 G.4q24 918,763.25 3,331,761.87 4,250,525.12
MENGERJAKAN UNTUK PONDASI PLAT 120/15 (136.95 Kg/M3) 1.000 M3 G.4a + G.25a.25 G.4q25 746,560.00 2,824,832.39 3,571,392.39
18 MUTU BETON SITE MIX K.225 ( dgn bekisting multipleks 12 mm)
MENGERJAKAN UNTUK SLOOF 15/20 (161.40 Kg/M3) 1.000 M3 G.4b + G.25a.1 G.4q1 1,109,720.75 3,840,856.26 4,950,577.01
MENGERJAKAN UNTUK SLOOF 15/25 (158.45 Kg/M3) 1.000 M3 G.4b + G.25a.2 G.4q2 1,097,880.75 3,801,240.26 4,899,121.01
MENGERJAKAN UNTUK SLOOF 20/25 (140.56 Kg/M3) 1.000 M3 G.4b + G.25a.3 G.4q3 1,012,521.75 3,515,633.66 4,528,155.41
MENGERJAKAN UNTUK SLOOF 20/30 (163.26 Kg/M3) 1.000 M3 G.4b + G.25a.4 G.4q4 864,050.00 3,112,220.98 3,976,270.98
MENGERJAKAN UNTUK KOLOM PRAKTIS 15/15 (206.34 Kg/M3) 1.000 M3 G.4b + G.25a.5 G.4q5 1,272,604.00 4,479,220.58 5,751,824.58
MENGERJAKAN UNTUK KOLOM 20/20 (195.13 Kg/M3) 1.000 M3 G.4b + G.25a.6 G.4q6 1,324,808.25 4,466,881.27 5,791,689.52
MENGERJAKAN UNTUK KOLOM 20/25 (195.89 Kg/M3) 1.000 M3 G.4b + G.25a.7 G.4q7 1,345,260.00 4,441,945.95 5,787,205.95
MENGERJAKAN UNTUK KOLOM 25/25 (154.28 Kg/M3) 1.000 M3 G.4b + G.25a.8 G.4q8 1,334,118.00 4,460,740.96 5,794,858.96
MENGERJAKAN UNTUK KOLOM 25/30 (205.80 Kg/M3) 1.000 M3 G.4b + G.25a.9 G.4q9 1,308,361.00 4,430,634.96 5,738,995.96
MENGERJAKAN UNTUK KOLOM 30/30 (174.93 Kg/M3) 1.000 M3 G.4b + G.25a.10 G.4q10 1,167,886.25 3,997,904.27 5,165,790.52
MENGERJAKAN UNTUK KOLOM 30/35 (194.44 Kg/M3) 1.000 M3 G.4b + G.25a.11 G.4q11 1,156,932.75 3,998,825.06 5,155,757.81
MENGERJAKAN UNTUK KOLOM 40/40 (246.24 Kg/M3) 1.000 M3 G.4b + G.25a.12 G.4q12 1,134,790.50 3,951,374.17 5,086,164.67
MENGERJAKAN UNTUK RINGBALK 15/20 (161.40 Kg/M3) 1.000 M3 G.4b + G.25a.13 G.4q13 1,018,229.00 3,628,095.58 4,646,324.58
MENGERJAKAN UNTUK RINGBALK 15/25 (158.45 Kg/M3) 1.000 M3 G.4b + G.25a.14 G.4q14 1,097,880.75 3,801,240.26 4,899,121.01
MENGERJAKAN UNTUK BALOK KONSOL15/30 (156.42 Kg/M3) 1.000 M3 G.4b + G.25a.15 G.4q15 1,346,234.75 4,520,068.25 5,866,303.00
MENGERJAKAN UNTUK BALOK LATEI 12/12 (293.91 Kg/M3) 1.000 M3 G.4b + G.25a.16 G.4q16 1,768,670.88 5,952,161.80 7,720,832.68
MENGERJAKAN UNTUK PLAT DAK BETON 150.51 Kg/M3) 1.000 M3 G.4b + G.25a.17 G.4q17 1,240,254.00 4,090,601.55 5,330,855.55
MENGERJAKAN UNTUK BALOK 20/30 (163.26 Kg/M3) 1.000 M3 G.4b + G.25a.18 G.4q18 796,336.75 2,932,479.17 3,728,815.92
MENGERJAKAN UNTUK BALOK 20/40 (181.82 Kg/M3) 1.000 M3 G.4b + G.25a.19 G.4q19 733,040.67 2,673,870.83 3,406,911.49
MENGERJAKAN UNTUK BALOK 25/50 (145.74 Kg/M3) 1.000 M3 G.4b + G.25a.20 G.4q20 1,282,066.75 4,417,516.66 5,699,583.41
MENGERJAKAN UNTUK BALOK 30/60 (173.26 Kg/M3) 1.000 M3 G.4b + G.25a.21 G.4q21 1,183,597.50 4,111,315.22 5,294,912.72
MENGERJAKAN UNTUK PONDASI POOR (105.00 Kg/M3) 1.000 M3 G.4b + G.25a.22 G.4q22 1,106,622.00 3,923,853.78 5,030,475.78
MENGERJAKAN UNTUK PONDASI PLAT 170/20 (164.94 Kg/M3) 1.000 M3 G.4b + G.25a.23 G.4q23 744,166.75 2,757,921.17 3,502,087.92
MENGERJAKAN UNTUK PONDASI PLAT 150/20 (144.08 Kg/M3) 1.000 M3 G.4b + G.25a.24 G.4q24 918,763.25 3,394,261.87 4,313,025.12
MENGERJAKAN UNTUK PONDASI PLAT 120/15 (136.95 Kg/M3) 1.000 M3 G.4b + G.25a.25 G.4q25 746,560.00 2,887,332.39 3,633,892.39
19 MUTU BETON READY MIX K.225 ( dgn bekisting multipleks 12 mm)
MENGERJAKAN UNTUK SLOOF 15/20 (161.40 Kg/M3) 1.000 M3 G.4e + G.25a.1 G.4q1 1,156,970.75 3,833,556.26 4,990,527.01
MENGERJAKAN UNTUK SLOOF 15/25 (158.45 Kg/M3) 1.000 M3 G.4e + G.25a.2 G.4q2 1,145,130.75 3,793,940.26 4,939,071.01
MENGERJAKAN UNTUK SLOOF 20/25 (140.56 Kg/M3) 1.000 M3 G.4e + G.25a.3 G.4q3 1,059,771.75 3,508,333.66 4,568,105.41
MENGERJAKAN UNTUK SLOOF 20/30 (163.26 Kg/M3) 1.000 M3 G.4e + G.25a.4 G.4q4 911,300.00 3,104,920.98 4,016,220.98
MENGERJAKAN UNTUK KOLOM PRAKTIS 15/15 (206.34 Kg/M3) 1.000 M3 G.4e + G.25a.5 G.4q5 1,319,854.00 4,471,920.58 5,791,774.58
MENGERJAKAN UNTUK KOLOM 20/20 (195.13 Kg/M3) 1.000 M3 G.4e + G.25a.6 G.4q6 1,372,058.25 4,459,581.27 5,831,639.52
MENGERJAKAN UNTUK KOLOM 20/25 (195.89 Kg/M3) 1.000 M3 G.4e + G.25a.7 G.4q7 1,392,510.00 4,434,645.95 5,827,155.95
MENGERJAKAN UNTUK KOLOM 25/25 (154.28 Kg/M3) 1.000 M3 G.4e + G.25a.8 G.4q8 1,381,368.00 4,453,440.96 5,834,808.96
MENGERJAKAN UNTUK KOLOM 25/30 (205.80 Kg/M3) 1.000 M3 G.4e + G.25a.9 G.4q9 1,355,611.00 4,423,334.96 5,778,945.96
MENGERJAKAN UNTUK KOLOM 30/30 (174.93 Kg/M3) 1.000 M3 G.4e + G.25a.10 G.4q10 1,215,136.25 3,990,604.27 5,205,740.52
MENGERJAKAN UNTUK KOLOM 30/35 (194.44 Kg/M3) 1.000 M3 G.4e + G.25a.11 G.4q11 1,204,182.75 3,991,525.06 5,195,707.81
MENGERJAKAN UNTUK KOLOM 40/40 (246.24 Kg/M3) 1.000 M3 G.4e + G.25a.12 G.4q12 1,182,040.50 3,944,074.17 5,126,114.67
MENGERJAKAN UNTUK RINGBALK 15/20 (161.40 Kg/M3) 1.000 M3 G.4e + G.25a.13 G.4q13 1,065,479.00 3,620,795.58 4,686,274.58
MENGERJAKAN UNTUK RINGBALK 15/25 (158.45 Kg/M3) 1.000 M3 G.4e + G.25a.14 G.4q14 1,145,130.75 3,793,940.26 4,939,071.01

HARGA SATUAN PEKERJAAN Halaman 23


KODE HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN
ANALISA UPAH (Rp.) BAHAN (Rp.) ALAT (Rp.) (Rp.)
1 2 3 4 5 6 7=(4+5+6)
MENGERJAKAN UNTUK BALOK KONSOL15/30 (156.42 Kg/M3) 1.000 M3 G.4e + G.25a.15 G.4q15 1,393,484.75 4,512,768.25 5,906,253.00
MENGERJAKAN UNTUK BALOK LATEI 12/12 (293.91 Kg/M3) 1.000 M3 G.4e + G.25a.16 G.4q16 1,815,920.88 5,944,861.80 7,760,782.68
MENGERJAKAN UNTUK PLAT DAK BETON 150.51 Kg/M3) 1.000 M3 G.4e + G.25a.17 G.4q17 1,287,504.00 4,083,301.55 5,370,805.55
MENGERJAKAN UNTUK BALOK 20/30 (163.26 Kg/M3) 1.000 M3 G.4e + G.25a.18 G.4q18 843,586.75 2,925,179.17 3,768,765.92
MENGERJAKAN UNTUK BALOK 20/40 (181.82 Kg/M3) 1.000 M3 G.4e + G.25a.19 G.4q19 780,290.67 2,666,570.83 3,446,861.49
MENGERJAKAN UNTUK BALOK 25/50 (145.74 Kg/M3) 1.000 M3 G.4e + G.25a.20 G.4q20 1,329,316.75 4,410,216.66 5,739,533.41
MENGERJAKAN UNTUK BALOK 30/60 (173.26 Kg/M3) 1.000 M3 G.4e + G.25a.21 G.4q21 1,230,847.50 4,104,015.22 5,334,862.72
MENGERJAKAN UNTUK PONDASI POOR (105.00 Kg/M3) 1.000 M3 G.4e + G.25a.22 G.4q22 1,153,872.00 3,916,553.78 5,070,425.78
MENGERJAKAN UNTUK PONDASI PLAT 170/20 (164.94 Kg/M3) 1.000 M3 G.4e + G.25a.23 G.4q23 791,416.75 2,750,621.17 3,542,037.92
MENGERJAKAN UNTUK PONDASI PLAT 150/20 (144.08 Kg/M3) 1.000 M3 G.4e + G.25a.24 G.4q24 966,013.25 3,386,961.87 4,352,975.12
MENGERJAKAN UNTUK PONDASI PLAT 120/15 (136.95 Kg/M3) 1.000 M3 G.4e + G.25a.25 G.4q25 793,810.00 2,880,032.39 3,673,842.39

PEKERJAAN PENUTUP ATAP H


1 1 M2 PASANG ATAP GENTENG PALENTONG KECIL H.1 15,075.00 30,000.00 45,075.00
2 1 M2 PASANG ATAP GENTENG KODOK / GLAZUUR H.2 15,075.00 77,500.00 92,575.00
3 1 M2 PASANG ATAP GENTENG KODOK / ALTO NATURAL H.2a. 15,075.00 77,500.00 92,575.00
2 1 M2 PASANG ATAP GENTENG MORANDO NATURAL H.2c. 15,075.00 48,600.00 63,675.00
3 1 M2 PASANG ATAP GENTENG MORANDO TRANSPARANT H.2d. 15,075.00 52,200.00 67,275.00
4 1 M2 PASANG ATAP GENTENG MORANDO WARNA H.2e. 15,075.00 59,400.00 74,475.00
4 1 M2 PASANG PENUTUP ATAP GENTENG LAMA H.2f. 15,075.00 - 15,075.00
7 1 M2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR H.3. 13,960.00 16,800.00 30,760.00
5 1 M' PASANG GENTENG BUBUNG PALENTONG H.4. 38,560.00 31,500.00 70,060.00
6 1 M' PASANG GENTENG BUBUNG KODOK GLAZUUR H.5. 38,560.00 44,500.00 83,060.00
10 1 M' PASANG GENTENG BUBUNG KODOK/ALTO NATURAL H.5a. 38,560.00 44,500.00 83,060.00
7 1 M' PASANG GENTENG BUBUNG MORANDO NATURAL H.5c. 38,560.00 37,600.00 76,160.00
8 1 M' PASANG GENTENG BUBUNG MORANDO TRANSPARANT H.5d. 38,560.00 41,200.00 79,760.00
9 1 M' PASANG GENTENG BUBUNG MORANDO WARNA H.5e. 38,560.00 46,400.00 84,960.00
10 1 M' PASANG BUBUNG GENTENG PALENTONG BESAR H.6. 38,560.00 31,600.00 70,160.00
11 1 M2 PASANG ATAP ASBES GELOMBANG (2,50 x 0,92) x 5 mm H.8. 14,475.00 49,850.00 64,325.00
12 1 M2 PASANG ATAP ASBES GELOMBANG (2,50 x 0,92) x 4 mm H.8a. 14,475.00 48,650.00 63,125.00
13 1 M2 PASANG ATAP ASBES GELOMBANG (2,25 x 0,92) x 5 mm H.9. 14,475.00 53,700.00 68,175.00
14 1 M2 PASANG ATAP ASBES GELOMBANG (2,25 x 0,92) x 4 mm H.9a. 14,475.00 51,780.00 66,255.00
15 1 M' PASANG BUBUNG STEL GELOMBANG 0,92 M H.22. 14,395.00 35,920.00 50,315.00
20 1 M2 PASANG ATAP GENTENG BETON H.30. 20,000.00 57,728.00 77,728.00
21 1 M2 PASANG ATAP GENTENG METAL H.32. 20,000.00 133,870.00 153,870.00
22 1 M' PASANG NOK GENTENG BETON H.34. 40,000.00 57,780.00 97,780.00
23 1 M' PASANG NOK GENTENG METAL H.36. 26,840.00 49,060.00 75,900.00
8 1 M2 PASANG ATAP SENG GELOMBANG H.38. 12,000.00 42,020.00 54,020.00
9 1 M' PASANG NOK SENG H.39. 14,590.00 15,070.00 29,660.00
PEKERJAAN LANGIT - LANGIT I
1 1 M2 LANGIT-LANGIT ASBES (1,00 x 1,00) M, TEBAL 5 mm I.2 6,960.00 20,790.00 27,750.00
2 1 M2 LANGIT-LANGIT ASBES (1,00 x 1,00) M, TEBAL 4 mm I.3 6,960.00 18,920.00 25,880.00
3 1 M2 LANGIT-LANGIT ASBES (1,00 x 1,00) M, TEBAL 4 mm, RANGKA BORNEO I.20 34,560.00 77,044.00 111,604.00
4 1 M' LANGIT-LANGIT ASBES (1,00 x 1,00) M, TEBAL 4 mm, RANGKA KAYU LAMA I.20.Rob 34,560.00 20,020.00 54,580.00
5 1 M2 LANGIT-LANGIT ASBES (1,00 x 1,00) M, TEBAL 4 mm, RANGKA KRUING I.20a. 34,560.00 95,827.60 130,387.60
6 1 M2 LANGIT-LANGIT ETERNIT (1,00 x 1,00) M, RANGKA BORNEO I.20b. 34,560.00 66,814.00 101,374.00
7 1 M2 LANGIT-LANGIT ETERNIT (1,00 x 1,00) M, RANGKA KAYU LAMA I.20b.Rob 34,560.00 9,790.00 44,350.00
8 1 M2 LANGIT-LANGIT ETERNIT (1,00 x 1,00) M, RANGKA KRUING I.20c. 34,560.00 81,664.00 116,224.00
9 1 M2 LANGIT-LANGIT GRC (120 x 240) Cm, RANGKA LAMA I.20c.Rob 34,560.00 21,285.28 55,845.28
10 1 M2 LANGIT-LANGIT TRIPLEKS 6 mm, RANGKA BORNEO I.21 34,560.00 95,368.90 129,928.90
11 1 M2 LANGIT-LANGIT LAMBRESERING KAYU LEBAR 9 Cm I.21.Rob 34,560.00 231,968.61 266,528.61
12 1 M2 LANGIT-LANGIT TRIPLEKS 6 mm, RANGKA KAYU LAMA I.22 34,560.00 38,344.90 72,904.90
13 1 M2 LANGIT-LANGIT GYPSUM BOARD , TEBAL 9 mm I.24. 34,560.00 35,611.28 70,171.28
14 1 M2 LANGIT-LANGIT GYPSUM BOARD , TEBAL 9 mm, RANGKA BORNEO I.24a. 34,560.00 95,260.00 129,820.00
15 1 M2 LANGIT-LANGIT GYPSUM BOARD , TEBAL 9 mm, RANGKA KRUING I.24b. 34,560.00 114,043.60 148,603.60
16 1 M2 LANGIT-LANGIT GRC, RANGKA BORNEO I.24a.Rob 34,560.00 80,946.00 115,506.00
17 1 M2 LANGIT-LANGIT GRC, RANGKA KRUING I.24b.Rob 34,560.00 99,729.60 134,289.60
PEKERJAAN SANITASI J
1 MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOK J.1. 282,370.00 1,122,000.00 1,404,370.00
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN J.2. 170,370.00 149,000.00 319,370.00
3 MEMASANG 1 BUAH URINOIR J.4. 140,000.00 1,309,000.00 1,449,000.00
4 MEMASANG 1 BUAH WASHTAFEL J.5. 184,750.00 535,920.00 720,670.00
5 MEMASANG 1 BUAH BAK MANDI BATU BATA LAPIS KERAMIK VOLUME 0,3 M3 J.8. 600,000.00 546,275.00 1,146,275.00
6 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (30 x 30) cm, T-35 cm J.16. 124,915.00 155,410.00 280,325.00
7 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (45 x 45) cm, T-50 cm J.17. 124,915.00 250,710.00 375,625.00
8 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1/2" J.19. 11,880.00 24,800.00 36,680.00
9 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3/4" J.20. 11,880.00 37,510.00 49,390.00
10 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1/2" J.25. 6,624.00 6,820.00 13,444.00
11 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3/4" J.26. 6,624.00 8,835.00 15,459.00
12 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3" J.31. 14,908.00 40,455.00 55,363.00
13 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4" J.32. 14,908.00 94,550.00 109,458.00
14 MEMASANG 1 BUAH BAK CUCI PIRING STAINLESS STEEL J.33. 23,520.00 338,800.00 362,320.00
15 MEMASANG 1 BUAH KRAN D.3/4" ATAU D.1/2" J.35. 8,200.00 22,557.50 30,757.50
16 MEMASANG 1 BUAH FLOOR DRAIN J.36. 8,200.00 11,000.00 19,200.00
17 MEMASANG 1 BUAH FLOOR DRAIN ALLUMUNIUM / STAINLESS J.36.Rob 8,200.00 33,000.00 41,200.00
18 MEMASANG 1 UNIT SEPTIK TANK 2,5 x 1,5 x 2 + REMBESAN (KANTOR TIPE BESAR) J.36a. 3,085,278.60 7,837,227.35 10,922,505.95
19 MEMASANG 1 UNIT SEPTIK TANK 2,5 x 1,5 x 1,5 + REMBESAN (KANTOR TIPE KECIL) J.36b. 1,851,163.40 4,702,305.21 6,553,468.61
20 MEMASANG 1 UNIT SEPTIK TANK 1,5 x 1,5 x 1,5 + REMBESAN (KANTOR TIPE KECIL) J.36c. 965,219.04 2,946,817.61 3,912,036.65
21 1 M' SALURAN GREVEL BETON 1/2 d.20 CM + PASANGAN J.37. 65,820.00 3,067,722.61 186,725.00

HARGA SATUAN PEKERJAAN Halaman 24


KODE HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN
ANALISA UPAH (Rp.) BAHAN (Rp.) ALAT (Rp.) (Rp.)
1 2 3 4 5 6 7=(4+5+6)
22 1 M' SALURAN GREVEL BETON 1/2 d.30 CM + PASANGAN J.38. 67,180.00 136,305.00 203,485.00
23 1 M2 PASANGAN PAVING BLOCK WARNA T.6 CM J.39. 49,490.00 68,107.00 117,597.00
24 1 M2 PASANGAN PAVING BLOCK WARNA T.6 CM (dengan pasir urug) J.39.Rob 49,490.00 54,107.00 103,597.00
25 1 M2 PASANGAN PAVING BLOCK WARNA T.8 CM J.40. 49,490.00 76,995.00 126,485.00
26 1 M2 PASANGAN PAVING BLOCK WARNA T.8 CM (dengan pasir urug) J.40.Rob 49,490.00 62,995.00 112,485.00
27 1 M2 PASANGAN PAVING BLOCK NATURAL T.6 CM J.41. 49,490.00 65,885.00 115,375.00
28 1 M2 PASANGAN PAVING BLOCK NATURAL T.6 CM (dengan pasir urug) J.41.Rob 49,490.00 51,885.00 101,375.00
29 1 M2 PASANGAN PAVING BLOCK NATURAL T.8 CM J.42. 49,490.00 74,773.00 124,263.00
30 1 M2 PASANGAN PAVING BLOCK NATURAL T.8 CM (dengan pasir urug) J.42.Rob 49,490.00 60,773.00 110,263.00
PEKERJAAN BESI DAN ALUMUNIUM K
1 1 KG PASANG RANGKA ATAP BAJA K.1 4,434.00 14,630.00 19,064.00
2 1 KG PASANGAN ROLLING DOOR K.8 168,266.00 467,500.00 635,766.00
3 1 M2 PASANGAN TRALIS BESI K.12 150,888.00 132,250.00 283,138.00
4 1 M2 PASANGAN KAWAT HARMONIKA K.13 13,240.00 41,273.32 54,513.32
5 1 M2 PASANGAN KAWAT NYAMUK K.14 13,240.00 28,403.32 41,643.32
6 1 M2 PASANGAN TALANG DATAR,SENG BJLS 28 K.18 36,854.00 83,678.32 120,532.32
7 1 M2 PASANGAN TALANG MIRING, SENG BJLS 28 K.19 30,254.00 135,704.80 165,958.80
PEKERJAAN KUNCI DAN KACA L
1 1 BH PASANG KUNCI TANAM DOUBLE SLAAG L.2 34,200.00 108,200.00 142,400.00
2 1 BH PASANG EXPANOLATE L.3 34,200.00 74,800.00 109,000.00
3 1 BH PASANG ENGSEL PINTU L.5 11,760.00 23,100.00 34,860.00
4 1 BH PASANG ENGSEL JENDELA L.6 7,840.00 17,000.00 24,840.00
5 1 BH PASANG KAIT ANGIN L.9 11,760.00 8,800.00 20,560.00
6 1 BH PASANG KUNCI SELOT L.11 7,840.00 14,300.00 22,140.00
7 1 BH PASANG PEGANGAN PINTU / DOOR HOLDER L.12 39,200.00 183,700.00 222,900.00
8 1 M2 PASANG KACA POLOS, TEBAL 5 mm L.17 11,764.00 119,790.00 131,554.00
9 1 M2 PASANG KACA RAYBAND, TEBAL 5 mm L.17a 11,764.00 123,420.00 135,184.00
PEKERJAAN PENUTUP LANTAI DAN DINDING M
1 1 M2 PASANG LANTAI TEGEL BADAK UKURAN 30 x 30 cm M.4 42,379.00 58,966.28 101,345.28
2 1 M2 PASANG LANTAI TEGEL BADAK LAMA M.4.a 42,379.00 19,688.50 62,067.50
3 1 M2 PASANG LANTAI KERAMIK PUTIH UKURAN 30 x 30 cm M.5a 42,379.00 58,573.50 100,952.50
4 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 30 x 30 cm M.5b 42,379.00 67,461.50 109,840.50
5 1 M2 PASANG LANTAI MARMER POLOS M.5b.1 42,379.00 297,438.50 339,817.50
6 1 M2 PASANG LANTAI GRANIT M.5b.2 42,379.00 491,863.50 534,242.50
7 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 40 x 40 cm M.5c 42,379.00 78,571.50 120,950.50
8 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 33 x 33 cm M.5d 42,379.00 119,678.50 162,057.50
9 1 M2 PASANG LANTAI KERAMIK ESSENZA cm 40 x 40 cm M.5a.Rob 42,379.00 260,775.50 303,154.50
10 1 M2 PASANG LANTAI GRANITO UKURAN 40 x 40 cm M.5b.Rob 42,379.00 250,776.50 293,155.50
11 1 M2 PASANG LANTAI GRANITO UKURAN 60 x 60 cm M.5c.Rob 42,379.00 255,220.50 297,599.50
12 1 M2 PASANG DINDING KERAMIK WARNA UKURAN 20 x 25 cm M.68 45,756.00 73,016.50 118,772.50
13 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 20 x 20 cm, ANTI SLIP KM/WC M.68a 42,379.00 84,571.50 126,950.50
14 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 30 x 30 cm, ANTI SLIP KM/WC M.68b 42,379.00 81,238.50 123,617.50
15 1 M2 PASANG DINDING BATU TEMPEL HITAM M.68c 31,204.00 178,890.00 210,094.00
16 1 M2 PASANG LANTAI PARQUET JATI M.68d 66,800.00 274,560.00 341,360.00
17 1 M2 PASANG WALL PAPER M.68e 14,540.00 125,180.00 139,720.00
PEKERJAAN PENGECATAN N
1 1 M2 MENGIKIS / MENGEROK PERMUKAAN CAT DINDING LAMA N.1 9,200.00 330.00 9,530.00
2 1 M2 MENDEMPUL DAN MENGGOSOK KAYU N.6 5,480.00 5,442.00 10,922.00
3 1 M2 PENGECATAN BIDANG KAYU LAMA N.7 9,800.00 22,615.59 32,415.59
4 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ), N.8 5,405.00 34,003.00 39,408.00
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
5 1 M2 PENGECATAN KANSTEEN N.8.a 5,405.00 16,126.00 21,531.00
6 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR ), N.9 11,505.00 38,062.00 49,567.00
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR N.11 5,220.00 42,019.00 47,239.00
8 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER N.12 6,480.00 4,620.00 11,100.00
9 1 M2 PENGECATAN TEMBOK BARU ( 1 LAPIS PLAMIR ), N.14 5,936.00 10,491.00 16,427.00
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
10 1 M2 PENGECATAN TEMBOK LAMA 1 LAPIS N.15 4,904.00 7,807.00 12,711.00
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
11 1 M2 MENGECAT PERMUKAAN BAJA DENGAN MENI BESI N.20 16,400.00 2,805.00 19,205.00
12 1 M2 MENGECAT PERMUKAAN BAJA DENGAN MENI BESI ZINGCHROMATE N.20.Rob 16,400.00 6,325.00 22,725.00
13 1 M2 MENGECAT BESI (3x) N.21 34,400.00 19,752.50 54,152.50
14 1 M2 MENGECAT BESI (3x) POLLY URETHANE N.21.Rob 34,400.00 72,050.90 106,450.90

ANALISA BINA MARGA ( PEKERJAAN JALAN )

1 1 M3 GALIAN TANAH UNTUK KONSTRUKSI (MENGGUNAKAN BURUH) K.224 29,375.00 2,268.00 - 31,643.00
2 1 M3 PENIMBUNAN BADAN JALAN (MENGGUNAKAN BURUH) K.310 42,850.00 31,104.00 20,000.00 93,954.00
3 1 M3 PENIMBUNAN BADAN JALAN (MENGGUNAKAN ALAT) K.311 4,566.67 86,680.80 20,541.67 111,789.13
4 1 M3 GALIAN TANAH DAN PEMBUANGAN (MENGGUNAKAN ALAT) K.321 5,285.00 90.72 19,575.00 24,950.72
5 1 ARE PENYIAPAN TANAH DASAR (MENGGUNAKAN BURUH) K.341 101,656.25 7,560.00 14,531.25 123,747.50
6 1 ARE PENYIAPAN TANAH DASAR (MENGGUNAKAN ALAT) K.342 11,025.00 302.40 51,900.00 63,227.40
7 1 M3 PEMBENTUKAN BAHU JALAN KERAS/TANAH (MENGGUNAKAN ALAT) K.411.A 3,195.00 34,211.52 8,475.00 45,881.52
8 1 M3 MEMOTONG BAHU JALAN TINGGI (MENGGUNAKAN ALAT) K.421 6,286.67 120.96 22,833.33 29,240.96
9 1 M3 MEMOTONG BAHU JALAN TINGGI (MENGGUNAKAN ALAT) K.421.a 3,433.33 120.96 8,766.67 12,320.96
10 1 M3 LAPISAN PONDASI BAWAH KLAS C SIRTU (MENGGUNAKAN ALAT) K. 514 - - - -
11 1 M3 KONSTRUKSI LAPIS PONDASI BAWAH (LPB) DENGAN TELFORD K. 516 31,275.00 250,010.00 6,975.00 288,260.00

HARGA SATUAN PEKERJAAN Halaman 25


KODE HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN
ANALISA UPAH (Rp.) BAHAN (Rp.) ALAT (Rp.) (Rp.)
1 2 3 4 5 6 7=(4+5+6)
12 1 M3 LAPISAN PONDASI ATAS KLAS A AGREGAT PECAH TERSARING (ALAT) K.520 4,146.67 270,010.00 14,533.33 288,690.00
13 1 M2 LABURAN ASPAL DUA LAPIS (BURDA) MENGGUNAKAN ALAT K.617 1,546.67 30,900.50 2,841.67 35,288.83
14 1 M2 LABURAN ASPAL RESAP PELEKAT (PRIME COAT) K.619 - 7,087.00 290.00 7,377.00
15 1 M2 LABURAN ASPAL PELEKAT (TACK COAT) K.620 260.00 1,856.67 348.33 2,465.00
16 1 M2 PENGHAMPARAN LAPIS TIPIS ASPAL BETON (LATASTON) DENGAN ALAT K.636 829.33 87,466.67 1,976.67 90,272.67
17 1 M2 PENGHAMPARAN LAPIS TIPIS ASPAL BETON (LATASTON) DENGAN ALAT K.636.Rob 12,440.00 1,312,000.00 29,650.00 1,354,090.00
18 1 M2 PENGHAMPARAN LAPIS TIPIS ASPAL BETON (LATASTON) DGN BURUH K.636.A 898.00 32,435.00 362.50 33,695.50
19 1 M2 PENGHAMPARAN LAPIS TIPIS ASPAL BETON (LATASTON) DGN BURUH K.636.B 829.33 115,152.79 2,030.00 118,012.12
20 1 M3 URUGAN TANAH HITUNG - - - #REF!
21 1 M3 URUGAN TANAH HITUNG.ROB - - - #REF!
22 1 M2 STRIPING HITUNG - - - #REF!

#REF!

PT REKA CIPTA BINA SEMESTA


#REF!

HERI MUSTIKA, ST
0
0

HARGA SATUAN PEKERJAAN Halaman 26


PEMERINTAH KABUPATEN INDRAMAYU
DINAS CIPTA KARYA
Jln. Wiralodra Nomor 35/A Telp. (0234) 273076
I N D R A M A Y U - 45212

RENCANA BIAYA
PROYEK ......................................
LOKASI : ........................................
( SUMBER DANA APBD TAHUN ANGGARAN 2011 )

No. Uraian Pekerjaan Volume Analisa Harga Satuan Jumlah


( Rp. ) ( Rp. )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Ls - - -
2 Pengukuran kembali dan pemasangan baouwplank M' A.1a 47,977.20 -
3 Pembuatan direksi keet M2 A.5 687,540.00 -
4 Pek. Pembersihan lapangan dan perataan M2 A.8 10,000.00 -
5 Pek. Pembuatan stegger bambu M2 A.11 48,460.00 -
6 Pembuatan papan nama proyek M2 A.11.a 374,792.00 -
7 Pembuatan plank nama proyek digital printing M2 A.11a.Rob 160,890.40 -
8 Pek. Pagar pengaman proyek M' A.11b 332,639.88 -
9 Pek. Pemasangan stootwerk M2 A.11c 119,730.00 -
10 Biaya Ijin Mendirikan Bangunan (IMB) u/ baja ringan M2 - 5,000.00 -
11 Biaya Ijin Mendirikan Bangunan (IMB) u/ kayu M2 - 4,750.00 -
12 Biaya Ijin Mendirikan Bangunan (IMB) u/ pagar M2 - 3,750.00 -
JUMLAH I -
II PEKERJAAN TANAH
1 Pek. Galian tanah biasa kedalaman 1 M M3 B.1 27,200.00 -
2 Pek. Galian tanah biasa kedalaman 2 M M3 B.2 35,720.00 -
3 Pek. Galian tanah keras kedalaman 1 M M3 B.4 42,460.00 -
4 Pek. Urg. tanah lokal pakai alat berat dari luar dipadatkan M3 B.4a 51,738.00 -
5 Pek. Galian tanah lumpur M3 B.6 56,020.00 -
6 Pek. Stripping tanah M2 B.7 3,400.00 -
7 Pek. Pembuangan tanah minimal sejauh 150 meter M3 B.8 34,960.00 -
8 Pek. Urugan kembali pondasi M3 B.9 13,040.00 -
9 Pek. Pemadatan tanah ( menggunakan buruh ) M3 B.10 34,000.00 -
10 Pek. Urugan pasir alas pondasi t. M3 B.11 174,800.00 -
11 Pek. Urugan pasir alas lantai t. M3 B.11 174,800.00 -
12 Pek. Urugan tanah merah M3 B.11a 106,640.00 -
13 Pek. Urugan sirtu M3 B.15 219,560.00 -
14 Pek. Urugan tanah site M3 Hitung #REF! #REF!
JUMLAH II #REF!
III PEK. PASANGAN DAN PLESTERAN
1 Pas. Pondasi batu belah 1 Pc : 3 Ps M3 C.4 780,920.00 -
2 Pas. Pondasi batu lama 1 Pc : 3 Ps M3 C.4a 563,450.00 -
3 Pas. Pondasi batu belah 1 Pc : 4 Ps M3 C.5 731,170.00 -
4 Pas. Pondasi batu belah 1 Pc : 5 Ps M3 C.6 696,670.00 -
5 Pas. Batu belah lama 1 Pc : 5 Ps M3 C.6a 479,200.00 -
6 Pas. Batu kosong (Aanstamping) M3 C.14 354,240.00 -
7 Pas. Pondasi sikloop M3 C.15 1,646,200.00 -
8 Pas. Bata merah ( pasangan 1/2 bata ) 1 Pc : 3 Ps M2 D.10 97,655.00 -
9 Pas. Bata merah ( pasangan 1/2 bata ) 1 Pc : 4 Ps M2 D.11 94,100.00 -
10 Pas. Bata merah ( pasangan 1/2 bata ) 1 Pc : 5 Ps M2 D.12 91,870.00 -
11 Pas. Bata merah ( pasangan 1 bata ) 1 Pc : 5 Ps M2 D.12.a 191,600.00 -
12 Pas. Rooster Kerawang M2 D.12.Rob 128,610.00 -
13 Pas. Dinding rooster kerawang M2 D.22 183,050.00 -
14 Pas. Dinding Conblock M2 D.23 154,412.00 -
15 Pas. Dinding Marmer M2 D.27 422,160.00 -
16 Pek. Plesteran dinding 1 Pc : 3 Ps + Acian M2 E.4b 50,890.00 -
17 Pek. Acian M2 E.4c 23,070.00 -
18 Pek. Plesteran dinding 1 Pc : 4 Ps + Acian M2 E.4d 49,420.00 -
19 Pek. Plesteran dinding 1 Pc : 5 Ps + Acian M2 E.4e 46,390.00 -
20 Pek. Plesteran Berapen (kamprotan) M2 E.4e.Rob 34,792.50 -
16 Pek. Plesteran Beton 1 Pc : 3 Ps tebal 15 mm M2 E.27 46,895.00 -
21 Pek. Plesteran Siaran 1 Pc : 2 Ps M2 E.35 25,160.00 -
22 Pek. Lantai kerja (Beton Tumbuk) 1Pc : 3Ps : 5Kr M3 G.1 799,600.00 -
23 Pas. Lantai tegel badak warna 30 x 30 M2 M.4 101,345.28 -
24 Pas. Lantai tegel badak lama M2 M.4a 62,067.50 -

Page 27
1 2 3 4 5 6
25 Pas. Lantai keramik putih 30 x 30 M2 M.5a 100,952.50 -
26 Pas. Lantai keramik Essenza 40 x 40 M2 M.5a.Rob 303,154.50 -
27 Pas. Lantai keramik warna 30 x 30 M2 M.5b 109,840.50 -
28 Pas. Lantai Granit M2 M.5b.2 534,242.50 -
29 Pas. Lantai keramik warna 40 x 40 M2 M.5c 120,950.50 -
30 Pas. Lantai keramik warna 33 x 33 anti slip M2 M.5d 162,057.50 -
31 Pas. Dinding keramik warna 20 x 25 M2 M.68 118,772.50 -
32 Pas. Lantai keramik warna 20 x 20 Anti slip KM/WC M2 M.68a 126,950.50 -
33 Pas. Dinding batu tempel hitam M2 M.68c 210,094.00 -
34 Pas. Lantai parquet jati M2 M.68d 341,360.00 -
35 Pas. Wall paper M2 M.68e 139,720.00 -
36 Pas. Paving block warna t. 6 cm M2 J.39.Rob 103,597.00 -
37 Pas. Paving block warna t. 8 cm M2 J.40.Rob 112,485.00 -
38 Pas. Paving block natural t. 6 cm M2 J.41.Rob 101,375.00 -
39 Pas. Paving block natural t. 8 cm M2 J.42.Rob 110,263.00 -
40 Pas. Kansteen cetak beton Bh - 25,000.00 -
41 Pas. Border keramik 5/20 M' - 20,000.00 -
42 Pas. Water proofing plat beton reservoir M2 - 45,000.00 -
43 Pek. Pagar depan BRC d. 6 mm t. 1,20 M M' - - -
44 Pek. Pagar depan teralis besi t. 1,20 M M' - - -
JUMLAH III -
IV PEKERJAAN BETON
1 Pek. Cor beton site mix K. 175 M3 G.4a 990,100.00 -
2 Pek. Cor beton site mix K. 225 M3 G.4b 1,052,600.00 -
3 Pek. Cor beton ready mix K. 225 berikut selang M3 G.4e 1,092,550.00 -
4 Pek. Besi beton terpasang U. 24 Kg G.25a 16,080.00 -
5 Pek. Besi Hollow 40.40.2 M' - 150,000.00 -
6 Pek. Gantungan plafond besi d. 10 mm Kg G.4h 14,230.00 -
7 Pek. Baja IWF DN Kg G.4k 15,811.00 -
8 Pek. Konst. besi siku/profil EX DN Kg G.4l 16,021.00 -
9 Pek. Pengelasan dgn las listrik Cm G.4m 907.00 -
10 Melobang konstruksi besi dgn beton Titik G.4n 4,590.00 -
11 Pek. Begisting multiplek 9 mm M2 G.4p 116,496.95 -
MUTU BETON SITE MIX. K.175 -
1 Pek. Sloof 15/20 (166,67 Kg/M3) M3 G.4a+G.25a.1+G.29a 4,713,323.01 -
2 Pek. Sloof 15/25 (163,47 Kg/M3) M3 G.4a+G.25a.2+G.29b 4,661,867.01 -
3 Pek. Sloof 20/25 (140,40 Kg/M3) M3 G.4a+G.25a.3+G.29c 4,030,304.70 -
4 Pek. Sloof 20/30 (125,00 Kg/M3) M3 G.4a+G.25a.4+G.29d 3,782,672.70 -
5 Pek. Kolom praktis 12/12 (235,42 Kg/M3) M3 G.4a+G.25a.5+G.29e 6,080,202.29 -
6 Pek. Kolom selasar 20/20 (200,00 Kg/M3) M3 G.4a+G.25a.6+G.29f 5,771,245.40 -
7 Pek. Kolom 20/25 (180,80 Kg/M3) M3 G.4a+G.25a.7+G.29g 5,305,994.86 -
8 Pek. Kolom 25/25 (192,64 Kg/M3) M3 G.4a+G.25a.8+G.29h 5,339,867.52 -
9 Pek. Kolom 25/30 (200,53 Kg/M3) M3 G.4a+G.25a.9+G.29i 5,362,656.55 -
10 Pek. Kolom 30/30 (172,44 Kg/M3) M3 G.4a+G.25a.10+G.29j 4,806,104.61 -
11 Pek. Kolom 30/35 (179,43 Kg/M3) M3 G.4a+G.25a.11+G.29k 4,844,159.40 -
12 Pek. Kolom 40/40 (180,50 Kg/M3) M3 G.4a+G.25a.12+G.29l 4,675,112.70 -
13 Pek. Ring balk selasar 15/20 (166,67 Kg/M3) M3 G.4a+G.25a.13+G.29m 4,713,323.01 -
14 Pek. Ring balk selasar 15/25 (163,47 Kg/M3) M3 G.4a+G.25a.14+G.29n 4,974,896.09 -
15 Pek. Balok konsol selasar 15/30 (200,89 Kg/M3) M3 G.4a+G.25a.15+G.29o 5,524,568.60 -
16 Pek. Balok latei 10/20 (320,00 Kg/M3) M3 G.4a+G.25a.16+G.29p 7,700,845.40 -
17 Pek. Plat dak beton (152,42 Kg/M3) M3 G.4a+G.25a.17+G.29q 4,092,896.66 -
18 Pek. Plat dak beton (119,10 Kg/M3) M3 G.4a+G.25a.17a+G.29q1 3,687,800.70 -
19 Pek. Balok beton 20/30 (190,00 Kg/M3) M3 G.4a+G.25a.18+G.29r 3,313,743.62 -
20 Pek. Balok beton 20/40 (213,25 Kg/M3) M3 G.4a+G.25a.19+G.29s 5,397,375.88 -
21 Pek. Balok beton 25/50 (192,80 Kg/M3) M3 G.4a+G.25a.20+G.29t 4,872,896.70 -
22 Pek. Balok beton 30/60 (190,56 Kg/M3) M3 G.4a+G.25a.21+G.29u 4,706,187.86 -
23 Pek. Pondasi poor (105 Kg/M3) M3 G.4a+G.25a.22+G.29v 3,184,824.54 -
24 Pek. Pondasi plat t. 20 cm ( 166 Kg/M3 ) M3 G.4a+G.25a.23+G.29w 3,972,409.08 -
25 Pek. Pondasi plat t. 25 cm ( 137,80 Kg/M3 ) M3 G.4a+G.25a.24+G.29x 3,518,953.08 -
26 Pek. Pondasi plat t. 15 cm ( 208,87 Kg/M3 ) M3 G.4a+G.25a.25+G.29y 4,661,758.68 -
27 Pek. Balok 20/35 ( 217,71 Kg/M3 ) M3 G.4a+G.25a.26+G.29z 5,497,265.29 -
28 Pek. Balok 25/40 ( 204,60 Kg/M3 ) M3 G.4a+G.25a.27+G.29z1 5,101,769.34 -
29 Pek. Balok 25/45 ( 198,04 Kg/M3 ) M3 G.4a+G.25a.28+G.29z2 4,974,372.50 -
30 Pek. Balok 30/55 ( 187,27 Kg/M3 ) M3 G.4a+G.25a.29+G.29z3 4,665,805.82 -
31 Pek. Kolom 15/15 ( 211,56 Kg/M3 ) M3 G.4a+G.25a.30+G.29z4 6,479,106.19 -
32 Pek. Kolom 15/20 ( 226,00 Kg/M3 ) M3 G.4a+G.25a.31+G.29z5 6,449,922.11 -
33 Pek. Kolom 15/25 ( 187,20 Kg/M3 ) M3 G.4a+G.25a.32+G.29z6 5,669,503.57 -
34 Pek. Kolom 15/30 ( 200,89 Kg/M3 ) M3 G.4a+G.25a.33+G.29z7 5,785,556.60 -
35 Pek. Kolom 20/30 ( 200,67 Kg/M3 ) M3 G.4a+G.25a.34+G.29z8 5,521,422.29 -
36 Pek. Kolom 30/40 ( 200,67 Kg/M3 ) M3 G.4a+G.25a.35+G.29z9 4,862,082.34 -

Page 28
1 2 3 4 5 6
37 Pek. Kolom 50/50 ( 176,24 Kg/M3 ) M3 G.4a+G.25a.36+G.29z10 4,450,097.36 -
38 Pek. Kolom 35/35 ( 180,25 Kg/M3 ) M3 G.4a+G.25a.37+G.29z11 4,783,000.60 -
39 Pek. Kolom 45/45 ( 176,20 Kg/M3 ) M3 G.4a+G.25a.38+G.29z12 4,519,103.13 -
40 Pek. Plat listplank, kanopi ( 83,13 Kg/M3 ) M3 G.4a+G.25a.39+G.29z13 3,305,046.28 -
MUTU BETON SITE MIX. K. 225
1 Pek. Sloof 15/20 (166,67 Kg/M3) M3 G.4b+G.25a.1+G.29a 4,775,823.01 -
2 Pek. Sloof 15/25 (163,47 Kg/M3) M3 G.4b+G.25a.2+G.29b 4,724,367.01 -
3 Pek. Sloof 20/25 (140,40 Kg/M3) M3 G.4b+G.25a.3+G.29c 4,092,804.70 -
4 Pek. Sloof 20/30 (125,00 Kg/M3) M3 G.4b+G.25a.4 +G.29d 3,845,172.70 -
5 Pek. Kolom praktis 12/12 (235,42 Kg/M3) M3 G.4b+G.25a.5+G.29e 6,142,702.29 -
6 Pek. Kolom selasar 20/20 (200,00 Kg/M3) M3 G.4b+G.25a.6+G.29f 5,833,745.40 -
7 Pek. Kolom 20/25 (180,80 Kg/M3) M3 G.4b+G.25a.7+G.29g 5,368,494.86 -
8 Pek. Kolom 25/25 (192,64 Kg/M3) M3 G.4b+G.25a.8+G.29h 5,402,367.52 -
9 Pek. Kolom 25/30 (200,53 Kg/M3) M3 G.4b+G.25a.9+G.29i 5,425,156.55 -
10 Pek. Kolom 30/30 (172,44 Kg/M3) M3 G.4b+G.25a.10+G.29j 4,868,604.61 -
11 Pek. Kolom 30/35 (179,43 Kg/M3) M3 G.4b+G.25a.11+G.29k 4,906,659.40 -
12 Pek. Kolom 40/40 (180,50 Kg/M3) M3 G.4b+G.25a.12+G.29l 4,737,612.70 -
13 Pek. Ring balk selasar 15/20 (166,67 Kg/M3) M3 G.4b+G.25a.13+G.29m 4,775,823.01 -
14 Pek. Ring balk selasar 15/25 (163,47 Kg/M3) M3 G.4b+G.25a.14+G.29n 5,037,396.09 -
15 Pek. Balok konsol selasar 15/30 (200,89 Kg/M3) M3 G.4b+G.25a.15+G.29o 5,587,068.60 -
16 Pek. Balok latei 10/20 (320,00 Kg/M3) M3 G.4b+G.25a.16+G.29p 7,763,345.40 -
17 Pek. Plat dak beton (152,42 Kg/M3) M3 G.4b+G.25a.17+G.29q 4,155,396.66 -
18 Pek. Plat dak beton (119,10 Kg/M3) M3 G.4b+G.25a.17a+G.29q1 3,750,300.70 -
19 Pek. Balok beton 20/30 (190,00 Kg/M3) M3 G.4b+G.25a.18+G.29r 3,376,243.62 -
20 Pek. Balok beton 20/40 (213,25 Kg/M3) M3 G.4b+G.25a.19+G.29s 5,459,875.88 -
21 Pek. Balok beton 25/50 (192,80 Kg/M3) M3 G.4b+G.25a.20+G.29t 4,935,396.70 -
22 Pek. Balok beton 30/60 (190,56 Kg/M3) M3 G.4b+G.25a.21+G.29u 4,768,687.86 -
23 Pek. Pondasi poor (105 Kg/M3) M3 G.4b+G.25a.22+G.29v 3,247,324.54 -
24 Pek. Pondasi plat t. 20 cm ( 166 Kg/M3 ) M3 G.4b+G.25a.23+G.29w 4,034,909.08 -
25 Pek. Pondasi plat t. 25 cm ( 137,80 Kg/M3 ) M3 G.4b+G.25a.24+G.29x 3,581,453.08 -
26 Pek. Pondasi plat t. 15 cm ( 208,87 Kg/M3 ) M3 G.4b+G.25a.25+G.29y 4,724,258.68 -
27 Pek. Balok 20/35 ( 217,71 Kg/M3 ) M3 G.4b+G.25a.26+G.29z 5,559,765.29 -
28 Pek. Balok 25/40 ( 204,60 Kg/M3 ) M3 G.4b+G.25a.27+G.29z1 5,164,269.34 -
29 Pek. Balok 25/45 ( 198,04 Kg/M3 ) M3 G.4b+G.25a.28+G.29z2 5,036,872.50 -
30 Pek. Balok 30/55 ( 187,27 Kg/M3 ) M3 G.4b+G.25a.29+G.29z3 4,728,305.82 -
31 Pek. Kolom 15/15 ( 211,56 Kg/M3 ) M3 G.4b+G.25a.30+G.29z4 6,541,606.19 -
32 Pek. Kolom 15/20 ( 226,00 Kg/M3 ) M3 G.4b+G.25a.31+G.29z5 6,512,422.11 -
33 Pek. Kolom 15/25 ( 187,20 Kg/M3 ) M3 G.4b+G.25a.32+G.29z6 5,732,003.57 -
34 Pek. Kolom 15/30 ( 200,89 Kg/M3 ) M3 G.4b+G.25a.33+G.29z7 5,848,056.60 -
35 Pek. Kolom 20/30 ( 200,67 Kg/M3 ) M3 G.4b+G.25a.34+G.29z8 5,583,922.29 -
36 Pek. Kolom 30/40 ( 200,67 Kg/M3 ) M3 G.4b+G.25a.35+G.29z9 4,924,582.34 -
37 Pek. Kolom 50/50 ( 176,24 Kg/M3 ) M3 G.4b+G.25a.36+G.29z10 4,512,597.36 -
38 Pek. Kolom 35/35 ( 180,25 Kg/M3 ) M3 G.4b+G.25a.37+G.29z11 4,845,500.60 -
39 Pek. Kolom 45/45 ( 176,20 Kg/M3 ) M3 G.4b+G.25a.38+G.29z12 4,581,603.13 -
40 Pek. Plat listplank, kanopi ( 83,13 Kg/M3 ) M3 G.4b+G.25a.39+G.29z13 3,367,546.28 -
MUTU BETON READY MIX. K. 225
1 Pek. Sloof 15/20 (166,67 Kg/M3) M3 G.4e+G.25a.1+G.29a 4,815,773.01 -
2 Pek. Sloof 15/25 (163,47 Kg/M3) M3 G.4e+G.25a.2+G.29b 4,764,317.01 -
3 Pek. Sloof 20/25 (140,40 Kg/M3) M3 G.4e+G.25a.3+G.29c 4,132,754.70 -
4 Pek. Sloof 20/30 (125,00 Kg/M3) M3 G.4e+G.25a.4 +G.29d 3,885,122.70 -
5 Pek. Kolom praktis 12/12 (235,42 Kg/M3) M3 G.4e+G.25a.5+G.29e 6,182,652.29 -
6 Pek. Kolom selasar 20/20 (200,00 Kg/M3) M3 G.4e+G.25a.6+G.29f 5,873,695.40 -
7 Pek. Kolom 20/25 (180,80 Kg/M3) M3 G.4e+G.25a.7+G.29g 5,408,444.86 -
8 Pek. Kolom 25/25 (192,64 Kg/M3) M3 G.4e+G.25a.8+G.29h 5,442,317.52 -
9 Pek. Kolom 25/30 (200,53 Kg/M3) M3 G.4e+G.25a.9+G.29i 5,465,106.55 -
10 Pek. Kolom 30/30 (172,44 Kg/M3) M3 G.4e+G.25a.10+G.29j 4,908,554.61 -
11 Pek. Kolom 30/35 (179,43 Kg/M3) M3 G.4e+G.25a.11+G.29k 4,946,609.40 -
12 Pek. Kolom 40/40 (180,50 Kg/M3) M3 G.4e+G.25a.12+G.29l 4,777,562.70 -
13 Pek. Ring balk selasar 15/20 (166,67 Kg/M3) M3 G.4e+G.25a.13+G.29m 4,815,773.01 -
14 Pek. Ring balk selasar 15/25 (163,47 Kg/M3) M3 G.4e+G.25a.14+G.29n 5,077,346.09 -
15 Pek. Balok konsol selasar 15/30 (200,89 Kg/M3) M3 G.4e+G.25a.15+G.29o 5,627,018.60 -
16 Pek. Balok latei 10/20 (320,00 Kg/M3) M3 G.4e+G.25a.16+G.29p 6,884,795.40 -
17 Pek. Plat dak beton (152,42 Kg/M3) M3 G.4e+G.25a.17+G.29q 4,195,346.66 -
18 Pek. Plat dak beton (119,10 Kg/M3) M3 G.4e+G.25a.17a+G.29q1 3,790,250.70 -
19 Pek. Balok beton 20/30 (190,00 Kg/M3) M3 G.4e+G.25a.18+G.29r 3,576,359.93 -
20 Pek. Balok beton 20/40 (213,25 Kg/M3) M3 G.4e+G.25a.19+G.29s 5,499,825.88 -
21 Pek. Balok beton 25/50 (192,80 Kg/M3) M3 G.4e+G.25a.20+G.29t 4,975,346.70 -
22 Pek. Balok beton 30/60 (190,56 Kg/M3) M3 G.4e+G.25a.21+G.29u 4,808,637.86 -
23 Pek. Pondasi poor (105 Kg/M3) M3 G.4e+G.25a.22+G.29v 3,287,274.54 -
24 Pek. Pondasi plat t. 20 cm ( 166 Kg/M3 ) M3 G.4e+G.25a.23+G.29w 4,074,859.08 -

Page 29
1 2 3 4 5 6
25 Pek. Pondasi plat t. 25 cm ( 137,80 Kg/M3 ) M3 G.4e+G.25a.24+G.29x 3,621,403.08 -
26 Pek. Pondasi plat t. 15 cm ( 208,87 Kg/M3 ) M3 G.4e+G.25a.25+G.29y 4,764,208.68 -
27 Pek. Balok 20/35 ( 217,71 Kg/M3 ) M3 G.4e+G.25a.26+G.29z 5,599,715.29 -
28 Pek. Balok 25/40 ( 204,60 Kg/M3 ) M3 G.4e+G.25a.27+G.29z1 5,204,219.34 -
29 Pek. Balok 25/45 ( 198,04 Kg/M3 ) M3 G.4e+G.25a.28+G.29z2 5,076,822.50 -
30 Pek. Balok 30/55 ( 187,27 Kg/M3 ) M3 G.4e+G.25a.29+G.29z3 3,849,755.82 -
31 Pek. Kolom 15/15 ( 211,56 Kg/M3 ) M3 G.4e+G.25a.30+G.29z4 6,581,556.19 -
32 Pek. Kolom 15/20 ( 226,00 Kg/M3 ) M3 G.4e+G.25a.31+G.29z5 6,378,322.11 -
33 Pek. Kolom 15/25 ( 187,20 Kg/M3 ) M3 G.4e+G.25a.32+G.29z6 5,771,953.57 -
34 Pek. Kolom 15/30 ( 200,89 Kg/M3 ) M3 G.4e+G.25a.33+G.29z7 5,888,006.60 -
35 Pek. Kolom 20/30 ( 200,67 Kg/M3 ) M3 G.4e+G.25a.34+G.29z8 5,623,872.29 -
36 Pek. Kolom 30/40 ( 200,67 Kg/M3 ) M3 G.4e+G.25a.35+G.29z9 4,964,532.34 -
37 Pek. Kolom 50/50 ( 176,24 Kg/M3 ) M3 G.4e+G.25a.36+G.29z10 4,552,547.36 -
38 Pek. Kolom 35/35 ( 180,25 Kg/M3 ) M3 G.4e+G.25a.37+G.29z11 4,885,450.60 -
39 Pek. Kolom 45/45 ( 176,20 Kg/M3 ) M3 G.4e+G.25a.38+G.29z12 4,621,553.13 -
40 Pek. Plat listplank, kanopi ( 83,13 Kg/M3 ) M3 G.4e+G.25a.39+G.29z13 3,407,496.28 -
JUMLAH IV -
V PEKERJAAN KAYU
1 Pek. Kuda-kuda & Gording Kayu Kamper M3 F.28 11,428,230.00 -
2 Pek. Gording Kayu Kamper M3 F.28a 10,695,730.00 -
3 Pek. Kuda-kuda & Gording Kayu Borneo M3 F.29 6,533,780.00 -
4 Pek. Gording Kayu Borneo M3 F.29a 5,801,280.00 -
5 Pek. Kuda-kuda & Gording Kayu Kruing M3 F.30 8,255,610.00 -
6 Pek. Gording Kayu Kruing M3 F.30a 7,523,110.00 -
7 Pek. Kuda-kuda & Gording Kayu lama M3 F.30Rob 1,306,580.00 -
8 Pek. Kusen-kusen kayu Kamper M3 F.2 12,735,800.00 -
9 Pek. Kusen-kusen kayu borneo M3 F.3 7,396,400.00 -
10 Pek. Kusen-kusen kayu Kruing M3 F.4 9,274,760.00 -
11 Pek. Daun pintu Alumunium putih Lengkap tanpa kaca Unit - 1,433,300.00 -
12 Pek. Daun pintu Alumunium coklat Lengkap tanpa kaca Unit - 1,651,100.00 -
13 Pek. Kusen Alumunium standar natural 4" M' - 124,300.00 -
14 Pek. Kusen Alumunium standar natural 3" M' - 93,500.00 -
15 Pek. Kusen Alumunium warna doft 4" M' - 143,000.00 -
16 Pek. Kusen Alumunium warna doft 3" M' - 108,900.00 -
17 Pek. Daun jendela Alumunium putih lengkap tanpa kaca Unit - 311,300.00 -
18 Pek. Daun jendela Alumunium coklat lengkap tanpa kaca Unit - 361,900.00 -
19 Pek. Polycarbonat + kerangka besi M2 - 436,700.00 -
20 Pek. Polycarbonat + kerangka stainlestil M2 - 748,000.00 -
21 Pek. Foldinggate (pintu lipat) M2 - 635,800.00 -
22 Pek. Roling door ( grille ) M2 - 467,500.00 -
23 Pek. Rangka atap genteng morando Kayu Borneo M2 F.35 73,537.90 -
24 Pek. Rangka atap genteng morando Kayu Kruing M2 F.35b 96,685.20 -
25 Pek. Rangka atap genteng tegola Kayu Borneo M2 F.35Rob 61,199.20 -
26 Pek. Rangka atap genteng plentong Kayu Borneo M2 F.32 73,537.90 -
27 Pek. Rangka atap genteng plentong Kayu Kruing M2 F.32a 87,229.60 -
28 Pek. Rangka atap kaso lama reng Kayu Kruing M2 F.32a.Rob 30,496.00 -
29 Pek. Rangka atap kaso lama reng Kayu Borneo M2 F.32c.Rob 28,578.70 -
30 Pek. Rangka atap kaso + reng genteng plentong dolken M2 F.32b 40,490.00 -
31 Pek. Rangka atap kaso dolken + reng bambu, atap ijuk M2 F.32b.Rob 34,190.00 -
32 Pek. Rangka atap kaso dolken+reng ky borneo gtng plentong M2 F.32c 38,278.70 -
33 Pek. Daun pintu panil Kayu Kamper M2 F.8 650,296.00 -
34 Pek. Daun pintu panil Kayu Kruing M2 F.8b 534,576.00 -
35 Pek. Daun pintu double teackwood rangka Kayu Kamper M2 F.20 495,950.04 -
36 Pek. Daun pintu panel multiplek t. 9 mm rk.ky Kamper M2 F.20a 505,025.04 -
37 Pek. Teack wood untuk pelapis timbal M2 F.20b.Rob 145,155.00 -
38 Pek. Daun pintu dan jendela kaca kayu Kamper M2 F.10 550,709.00 -
39 Pek. Daun pintu dan jendela kaca kayu Kruing M2 F.11.a 449,454.00 -
40 Pek. Daun pintu double triplek kayu Lama M2 F.20d 246,540.00 -
41 Pek. Rangka Dinding triplek 6 mm kayu borneo M2 F.55 179,338.40 -
42 Pek. Dinding penyekat teakwood Kayu Kamper M2 F.56 413,094.05 -
43 Pek. Dinding penyekat teakwood Kayu borneo M2 F.57 292,741.40 -
44 Pek. Dinding pemisah multiplek 9 mm rk. Kayu kruing M2 F.57.Rob 286,716.15 -
44 Pek. Dinding penyekat dari triplek ky. borneo M2 F.57a 242,416.40 -
45 Pek. Dinding penyekat teakwood rangka ky. kruing M2 F.57b 336,601.15 -
46 Pek. Papan listplank 3/20 kayu Kruing M' F.48b 73,983.68 -
47 Pek. Papan listplank 3/5 kayu Bormeo M' F.48c 31,326.56 -
48 Pek. Papan listplank 3/30 kayu Kruing M' F.50b 103,628.40 -
49 Pek. Papan listplank Tumpangsari 3/30+2/10 ky Kruing M' F.51b 139,389.80 -
50 Pek. Papan listplank GRC tumpangsari (1/20+1/10) M' F.51b.Rob 39,189.33 -
51 Pek. Papan listplank GRC tumpangsari (1/30+1/10) M' F.51c.Rob 46,981.00 -

Page 30
1 2 3 4 5 6
52 Pek. Plafond Triplek rangka Kayu Borneo M' I.21 129,928.90 -
53 Pek. Plafond Triplek rangka kayu lama M' I.22 72,904.90 -
54 Pek. Plafond Lambersering ky 9 cm M' I.21Rob 266,528.61 -
55 Pek. Plafond plat asbes rangka Kayu Borneo M2 I.20 111,604.00 -
56 Pek. Plafond plat asbes rangka kayu lama M2 I.20Rob 54,580.00 -
57 Pek. Plafond plat asbes rangka kayu kruing M2 I.20a 130,387.60 -
58 Pek. Plafond eternit rangka Kayu Borneo M2 I.20b 101,374.00 -
59 Pek. Plafond eternit rangka Kayu lama M2 I.20b.Rob 44,350.00 -
60 Pek. Plafond GRC rangka ky borneo M2 I.20c 116,224.00 -
61 Pek. Plafond GRC rangka ky lama M2 I.20c.Rob 55,845.28 -
62 Pek. Plafond GRC rangka metal fooring M2 - 125,000.00 -
63 Pek. Plafond gypsum tanpa rangka M2 I.24 70,171.28 -
64 Pek. Plafond gypsum berikut rangka Kayu Borneo M2 I.24a 129,820.00 -
65 Pek. Talang datar seng BJLS 28 berikut papan M' K.18 120,532.32 -
66 Pek. Talang jurai seng BJLS 28 berikut papan M' K.19 165,958.80 -
67 Pek. Pasangan jalusi mati kusen kayu Kruing M2 F.17b 614,504.00 -
68 Pek. Pintu Super Vinyl KM/WC Bh - 375,000.00 -
69 Pek. Rooster kayu 20/30 Bh - 25,000.00 -
70 Pek. List plafond Kayu Kruing profil M' F.60 7,255.00 -
71 Pek. List gypsum t.10 cm M' - 15,000.00 -
JUMLAH V -
VI PEKERJAAN PENUTUP ATAP
1 Pas. Kuda-kuda rangka atap baja ringan zincallume M2 - 176,000.00 -
2 Pas. Penutup atap genteng morando natural M2 H.2c 63,675.00 -
3 Pas. Penutup atap genteng morando glazuur M2 H.2e 74,475.00 -
4 Pas. Penutup atap genteng press plentong ex. Jatiwangi M2 H.1 45,075.00 -
5 Pas. Penutup atap genteng lama M2 H.2f 15,075.00 -
6 Pas. Penutup atap genteng metal pooring M2 - 125,000.00 -
7 Pas. Penutup atap genteng tegola M2 - 150,000.00 -
8 Pek. Bubungan genteng morando glazuur M' H.5e 84,960.00 -
9 Pek. Bubungan genteng morando natural M' H.5c 76,160.00 -
10 Pek. Bubungan genteng plentong press Ex. Jatiwangi M' H.4 70,060.00 -
11 Pek. Atap asbes gelombang (2,4 x 1,05 M) tebal 4 mm M2 H.8a 63,125.00 -
12 Pek. Atap asbes gelombang (2,5 x 0,92 M) tebal 5 mm M2 H.8 64,325.00 -
13 Pek. Atap asbes gelombang (2,25 x 0,92 M) tebal 5 mm M2 H.9 68,175.00 -
14 Pek. Atap asbes gelombang (2,25 x 0,92 M) tebal 4 mm M2 H.9a 66,255.00 -
15 Pek. Atap seng gelombang BJLS 28 M2 H.9b 48,681.00 -
16 Pek. Bubungan Nok stell gelombang M' H.22 50,315.00 -
17 Pek. Atap asbes gelombang (2,25x0,92 M) t.5 mm M' H.10 61,521.00 -
18 Pas. Atap asbes gelombang lama M2 H.10.Rob 18,681.00 -
JUMLAH VI -
VII PEKERJAAN KUNCI DAN KACA
1 Pas. Kaca polos t. 5 mm M2 L.17 131,554.00 -
2 Pas. Kaca rayband t. 5 mm M2 L.17a 135,184.00 -
3 Pas. Kunci tanam double slaag (besar) Bh L.2 142,400.00 -
4 Pas. Engsel pintu Bh L.5 34,860.00 -
5 Pas. Engsel jendela Bh L.6 24,840.00 -
6 Pas. Grendel pintu / jendela (kunci selot) Bh L.11 22,140.00 -
7 Pas. Kait angin Bh L.9 20,560.00 -
8 Pas. Expanolete Bh L.3 109,000.00 -
JUMLAH VII -
VIII PEKERJAAN PENGECATAN
1 Pengecatan dinding tembok baru M2 N.14 16,427.00 -
2 Pengecatan dinding tembok lama M2 N.15 12,711.00 -
3 Pengecatan plafond baru M2 N.14 16,427.00 -
4 Pengecatan plafond lama M2 N.15 12,711.00 -
5 Pengecatan bidang kayu yang tampak M2 N.9 49,567.00 -
6 Pengecatan Kansteen M2 N.8a 21,531.00 -
7 Pengecatan bidang kayu lama M2 N.7 32,415.59 -
8 Plisturan daun pintu M2 N.11 47,239.00 -
9 Pek. Laburan residu kuda2 dan rangka atap M2 N.12 11,100.00 -
10 Pengecatan baja dengan meni besi M2 N.20 19,205.00 -
11 Pengecatan besi M2 N.21 106,450.90 -
JUMLAH VIII -
IX PEKERJAAN INSTALASI LISTRIK
1 Biaya Penyambungan Listik 1300 Watt Ls - 3,000,000.00 -
2 Biaya Penyambungan Listik 900 Watt Ls - 1,500,000.00 -
3 Instalasi titik cahaya berikut bahan & pasang standar PLN Ttk - 125,000.00 -
4 Pas. Saklar tunggal Bh - 19,800.00 -
5 Pas. Saklar double Bh - 25,800.00 -

Page 31
1 2 3 4 5 6
6 Pas. Stop kontak Bh - 19,800.00 -
7 Pas. Stop kontak AC Bh - 71,500.00 -
8 Pas. Lampu capsul 18 watt Bh - 37,400.00 -
9 Pas. Lampu capsul 9 watt Bh - 29,700.00 -
10 Pas. Armatur Tl 2 x 40 watt + kap Bh - 195,800.00 -
11 Pas. Armatur Tl 2 x 20 watt + kap Bh - 161,700.00 -
12 Pas. Armatur lampu pijar 25 Watt Bh - 5,500.00 -
13 Arde / Grouding panel Ls - - -
JUMLAH IX -
X PEKERJAAN SANITARY
1 Pas. Instalasi air bersih Pipa PVC 1/2" M' J.25 13,444.00 -
2 Pas. Instalasi air bersih Pipa PVC 3/4" M' J.26 15,459.00 -
3 Pas. Instalasi air kotor Pipa PVC 3" M' J.31 55,363.00 -
4 Pas. Instalasi air kotor Pipa PVC 4" M' J.32 109,458.00 -
5 Pas. Bak cuci piring stainles steel Bh J.33 362,320.00 -
6 Kran air tembok kait 1/2" KIT + sambungan Bh J.35 30,757.50 -
7 Floor drain plastik KM/WC 2,5" Bh J.36 19,200.00 -
8 Floor drain kuningan KM/WC 2,5" Bh J.36.Rob 41,200.00 -
9 Stop kran KIT 3/4" Bh - 60,500.00 -
10 Dop kuningan penguras bak d. 3/4" Bh - 15,000.00 -
11 Dop plastik penguras bak d. 3/4" Bh - 5,000.00 -
12 Closet jongkok porselin Bh J.2 319,370.00 -
13 Closet duduk porselin Bh J.1 1,404,370.00 -
14 Wastafel standard lengkap Bh J.5 720,670.00 -
15 Urinoar Keet lengkap accessories stop kran KIT Bh J.4 1,449,000.00 -
16 Membuat bak air bata lapis keramik Bh J.8 1,146,275.00 -
17 Bak kontrol pas. batu bata (30x30) cm t. 35 cm Bh J.16 280,325.00 -
18 Bak kontrol pas. batu bata (45x45) cm t. 50 cm Bh J.17 375,625.00 -
19 Septicktank berikut rembesan uk. 2,5x1,5x2 Unit J.36a 10,922,505.95 -
20 Septicktank berikut rembesan uk. 2,5x1,5x1,5 Unit J.36b 6,553,468.61 -
21 Septicktank berikut rembesan uk. 1,5x1x1,5 Unit J.36c 3,912,036.65 -
22 Pas. Pompa air jetpump 37 WATT Bh - - -
23 Pas. Pompa air jetpump 500 WATT Bh - 750,000.00 -
24 Pas. Sumur pompa tangan (SPT) Bh - 1,500,000.00 -
25 Pas. Saluran grevel buis beton 1/2 d. 20 M' J.37 186,725.00 -
26 Pas. Saluran grevel buis beton 1/2 d. 30 M' J.38 203,485.00 -
JUMLAH X -
XI PENGADAAN MEUBELAIR
1 Kursi Murid Bh - - -
2 Meja Murid Bh - - -
3 Kursi Guru Bh - - -
4 Meja Guru Bh - - -
5 Meja biro Bh - - -
6 Lamari Arsip Bh - - -
7 Rak Buku Bh - - -
8 Papan Tulis Bh - - -
9 Kursi Tamu Bh - - -
JUMLAH XI -
REKAPITULASI :
I PEKERJAAN PERSIAPAN ………… ………………………………………
………………….. -
II PEKERJAAN TANAH ………… ………………………………………
………………….. #REF!
III PEK. PASANGAN DAN PLESTERAN ………… ………………………………………
………………….. -
IV PEKERJAAN BETON ………… ………………………………………
………………….. -
V PEKERJAAN KAYU ………… ………………………………………
………………….. -
VI PEKERJAAN PENUTUP ATAP ………… ………………………………………
………………….. -
VII PEKERJAAN KUNCI DAN KACA ………… ………………………………………
………………….. -
VIII PEKERJAAN PENGECATAN ………… ………………………………………
………………….. -
IX PEKERJAAN INSTALASI LISTRIK ………… ………………………………………
………………….. -
X PEKERJAAN SANITARY ………… ………………………………………
………………….. -
XI PENGADAAN MEUBELAIR ………… ………………………………………
………………….. -
Sub Total #REF!
PPN 10% #REF!
Total #REF!
Dibulatkan #REF!
Biaya Umum -
TOTAL #REF!

TERBILANG : (

Page 32
1 2 3 4 5 6

Indramayu, 2011

MENGETAHUI :
KEPALA DINAS CIPTA KARYA KABID TATA BANGUNAN
KABUPATEN INDRAMAYU DINAS CIPTA KARYA KAB. INDRAMAYU

Drs. SUSANTO, BAE AGUS SUPRIYADI, BE


Pembina Tingkat I NIP. 19590803 198802 1 001
NIP. 19591229 198603 1 011

Page 33
PERHITUNGAN KERJA ALAT BERAT
Urugan Tanah
TAHUN ANGGARAN 2011

BULLDOZER D.65.D
Kecepatan Alat Dorong / Isi = 2 Km / Jam
Mundur / Kosong = 6 Km / Jam
Kecepatan Rata-rata = 4 Km / Jam
Lebar alat = 2 M'
Banyak Lintasan = 4 Lintasan
Tebal / Lapisan = 0.20 M'

Kapasitas per jam untuk mendorong dan meratakan dengan


ketebalan 0,20 M tiap lapisan = 4,000 x 2 x 0.20
M3 = 200.00 M3
8
= 75% x 200.00 M3 = 150.00 M3

FIBRO GETAR 25 TON


Kecepatan Alat Rata-rata = 5 Km / Jam
Lebar alat = 1.5 M'
Banyak Lintasan = 8 Lintasan
Tebal Lapisan = 0.20 M'

Kapasitas per jam = 5,000 x 1.5 x 0.20


M3 = 187.50 M3
8
Efesiensi Alat = 75% x 187.50 M3 = 140.63 M3

#REF!

PT REKA CIPTA BINA SEMESTA


#REF!

HERI MUSTIKA, ST
0
0
PERHITUNGAN BIAYA OPERASIONAL ALAT
Urugan Tanah
TAHUN ANGGARAN 2011

BULLDOZER D.65.D
Sewa Alat = 1 Jam x #REF! = #REF!
BBM Solar = 15 Ltr x Rp 5,500.00 = Rp 82,500.00
Uang Makan Operator + Pembantu = 1 x Rp 125,000.00 = Rp 15,625.00
8
Keamanan / Jaga = 1 x Rp 50,000.00 = Rp 6,250.00
8
Penginapan / Mess = 1 x Rp 500,000.00 = Rp 2,500.00
200
Jumlah biaya operasional per jam = #REF!

Jadi harga per M3 = #REF! #REF!


=
150.00

Biaya striping tebal 0.30 M' x 50% = 0.15 M3 x #REF! = #REF! / M2


= #REF!

FIBRO GETAR 25 TON


Sewa Alat = 1 Jam x #REF! = #REF!
BBM Solar = 15 Ltr x Rp 5,500.00 = Rp 82,500.00
Uang Makan Operator + Pembantu = 1 x Rp 125,000.00 = Rp 15,625.00
8
Keamanan / Jaga = 1 x Rp 50,000.00 = Rp 6,250.00
8
Penginapan / Mess = 1 x Rp 500,000.00 = Rp 2,500.00
200
Jumlah biaya operasional per jam = #REF!

Jadi harga per M3 = #REF! #REF!


=
140.63

KESIMPULAN :
JADI 1 M3 TANAH URUGAN DIPADATKAN DENGAN MENGGUNAKAN ALAT BERAT :
- Tanah di dorong / diratakan = 1.3 M3 x #REF! = #REF!
- Tanah dipadatkan = 1.3 M3 x #REF! = #REF!
- Pengadaan tanah = 1.3 M3 x Rp 25,700.00 = Rp 33,410.00
Jumlah = #REF!

###

PT REKA CIPTA BINA SEMESTA


###

HERI MUSTIKA, ST
0
0
Pembulatan Kenaikan harga Kenaikan 10% Harga Awal Prosentase
99,800.00 99,800.00 - 99,800.00 0%

50,000.00 50,000.00 - 50,000.00

500,000.00 500,000.00 - 500,000.00

150.00 - 150.00

225.00

50,000.00 50,000.00 - 50,000.00

140.63 - 140.63
PERHITUNGAN BIAYA OPERASIONAL ALAT
Urugan Tanah
TAHUN ANGGARAN 2011

BULLDOZER D.65.D
Sewa Alat = 1 Jam x #REF! = #REF!
BBM Solar = 15 Ltr x Rp 5,500.00 = Rp 82,500.00
Uang Makan Operator + Pembantu = 1 x Rp 125,000.00 = Rp 15,625.00
8
Keamanan / Jaga = 1 x Rp 50,000.00 = Rp 6,250.00
8
Penginapan / Mess = 1 x Rp 500,000.00 = Rp 2,500.00
200
Jumlah biaya operasional per jam = #REF!

Jadi harga per M3 = #REF! #REF!


=
150.00

Biaya striping tebal 0.30 M' x 50% = 0.15 M3 x #REF! = #REF! / M2


= #REF!

FIBRO GETAR 25 TON


Sewa Alat = 1 Jam x #REF! = #REF!
BBM Solar = 15 Ltr x Rp 5,500.00 = Rp 82,500.00
Uang Makan Operator + Pembantu = 1 x Rp 125,000.00 = Rp 15,625.00
8
Keamanan / Jaga = 1 x Rp 50,000.00 = Rp 6,250.00
8
Penginapan / Mess = 1 x Rp 500,000.00 = Rp 2,500.00
200
Jumlah biaya operasional per jam = #REF!

Jadi harga per M3 = #REF! #REF!


=
140.63

KESIMPULAN :
JADI 1 M3 TANAH URUGAN DIPADATKAN DENGAN MENGGUNAKAN ALAT BERAT :
- Tanah di dorong / diratakan = 1.3 M3 x #REF! = #REF!
- Tanah dipadatkan = 1.3 M3 x #REF! = #REF!
- Pengadaan tanah = 1.3 M3 x Rp 25,700.00 = Rp 33,410.00
- Retribusi = 1 M3 x Rp 3,500.00 = Rp 3,500.00
Jumlah = #REF!

###

PT REKA CIPTA BINA SEMESTA


###

HERI MUSTIKA, ST
0
0
Pembulatan Kenaikan harga Kenaikan 10% Harga Awal Prosentase
99,800.00 99,800.00 - 99,800.00 0%

50,000.00 50,000.00 - 50,000.00

500,000.00 500,000.00 - 500,000.00

150.00 - 150.00

225.00

50,000.00 50,000.00 - 50,000.00

140.63 - 140.63

3,500.00 3,500.00 - 3,500.00


PEMERINTAH KABUPATEN INDRAMAYU
DINAS CIPTA KARYA
Jln. Wiralodra Nomor 35/A Telp. (0234) 273076
I N D R A M A Y U - 45212

RENCANA BIAYA
PROYEK ......................................
LOKASI : ........................................
( SUMBER DANA APBD TAHUN ANGGARAN 2011 )

No. Uraian Pekerjaan Volume Analisa Harga Satuan Jumlah


( Rp. ) ( Rp. )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pek. Bongkaran Ls - - -
2 Pengukuran kembali dan pemasangan baouwplank M' A.1a 41,347.00 -
3 Pembuatan direksi keet M2 A.5 656,550.00 -
4 Pek. Pembersihan lapangan dan perataan M2 A.8 6,950.00 -
5 Pek. Pembuatan stegger bambu M2 A.11 39,494.00 -
6 Pembuatan papan nama proyek M2 - - -
7 Pembuatan plank nama proyek digital printing M2 A.11a.Rob 206,264.00 -
8 Pek. Pagar pengaman proyek M' A.11b 246,700.00 -
9 Pek. Pemasangan stootwerk M2 A.11c 104,305.00 -
10 Biaya Ijin Mendirikan Bangunan (IMB) u/ baja ringan M2 - 5,000.00 -
11 Biaya Ijin Mendirikan Bangunan (IMB) u/ kayu M2 - 4,750.00 -
12 Biaya Ijin Mendirikan Bangunan (IMB) u/ pagar M2 - 3,750.00 -
JUMLAH I -
II PEKERJAAN TANAH
1 Pek. Galian tanah biasa kedalaman 1 M M3 B.1 17,400.00 -
2 Pek. Galian tanah biasa kedalaman 2 M M3 B.2 22,842.00 -
3 Pek. Galian tanah keras kedalaman 1 M M3 B.4 27,155.00 -
4 Pek. Urg. tanah lokal pakai alat berat dari luar dipadatkan M3 B.4a 42,046.50 -
5 Pek. Galian tanah lumpur M3 B.6 35,846.00 -
6 Pek. Stripping tanah M2 B.7 2,175.00 -
7 Pek. Pembuangan tanah minimal sejauh 150 meter M3 B.8 22,342.00 -
8 Pek. Urugan kembali pondasi M3 B.9 8,339.00 -
9 Pek. Pemadatan tanah ( menggunakan buruh ) M3 B.10 21,750.00 -
10 Pek. Urugan pasir alas pondasi t. M3 B.11 131,510.00 -
11 Pek. Urugan pasir alas lantai t. M3 B.11 131,510.00 -
12 Pek. Urugan tanah merah M3 B.11a 91,670.00 -
13 Pek. Urugan sirtu M3 B.15 195,075.00 -
14 Pek. Urugan tanah site M3 Hitung 38,387.38 -
JUMLAH II -
III PEK. PASANGAN DAN PLESTERAN
1 Pas. Pondasi batu belah 1 Pc : 3 Ps M3 C.4 606,276.00 -
2 Pas. Pondasi batu lama 1 Pc : 3 Ps M3 C.4a 408,496.00 -
3 Pas. Pondasi batu belah 1 Pc : 4 Ps M3 C.5 564,607.00 -
4 Pas. Pondasi batu belah 1 Pc : 5 Ps M3 C.6 535,725.40 -
5 Pas. Batu belah lama 1 Pc : 5 Ps M3 C.6a 337,945.40 -
6 Pas. Batu kosong (Aanstamping) M3 C.14 299,598.00 -
7 Pas. Pondasi sikloop M3 C.15 1,350,125.00 -
8 Pas. Bata merah ( pasangan 1/2 bata ) 1 Pc : 3 Ps M2 D.10 76,693.00 -
9 Pas. Bata merah ( pasangan 1/2 bata ) 1 Pc : 4 Ps M2 D.11 73,688.80 -
10 Pas. Bata merah ( pasangan 1/2 bata ) 1 Pc : 5 Ps M2 D.12 71,798.00 -
11 Pas. Rooster Kerawang M2 D.12.Rob 105,990.00 -
12 Pas. Dinding rooster kerawang M2 D.22 155,336.00 -
13 Pas. Dinding Conblock M2 D.23 128,699.30 -
14 Pas. Dinding Marmer M2 D.27 361,813.00 -
15 Membuat Patung Tinggi 3 M sesuai Design Unit D.28 - -
16 Pek. Plesteran dinding 1 Pc : 3 Ps + Acian M2 E.4b 36,592.40 -
17 Pek. Acian M2 E.4c 16,903.50 -
18 Pek. Plesteran dinding 1 Pc : 4 Ps + Acian M2 E.4d 35,416.40 -
19 Pek. Plesteran dinding 1 Pc : 5 Ps + Acian M2 E.4e 32,992.40 -
20 Pek. Plesteran Berapen (kamprotan) M2 E.4e.Rob 24,744.30 -
21 Pek. Plesteran Siaran 1 Pc : 2 Ps M2 E.35 17,638.60 -
22 Pek. Lantai kerja (Beton Tumbuk) 1Pc : 3Ps : 5Kr M3 G.1 562,101.00 -
23 Pas. Lantai tegel badak warna 30 x 30 M2 M.4 82,015.21 -
24 Pas. Lantai tegel badak lama M2 M.4a 46,104.10 -

Page 39
1 2 3 4 5 6
25 Pas. Lantai keramik putih 30 x 30 M2 M.5a 81,454.10 -
26 Pas. Lantai keramik Essenza 40 x 40 M2 M.5a.Rob 265,274.10 -
27 Pas. Lantai keramik warna 30 x 30 M2 M.5b 89,534.10 -
28 Pas. Lantai Granit M2 M.5b.2 507,854.10 -
29 Pas. Lantai keramik warna 40 x 40 M2 M.5c 99,634.10 -
30 Pas. Lantai keramik warna 33 x 33 anti slip M2 M.5d 137,004.10 -
31 Pas. Dinding keramik warna 20 x 25 M2 M.68 97,332.60 -
32 Pas. Lantai keramik warna 20 x 20 Anti slip KM/WC M2 M.68a 104,434.10 -
33 Pas. Dinding batu tempel hitam M2 - 200,000.00 -
34 Pas. Lantai parquet jati M2 M.68d 297,007.50 -
35 Pas. Wall paper M2 M.68e 125,816.50 -
36 Pas. Paving block warna t. 6 cm M2 J.39.Rob 85,720.00 -
37 Pas. Paving block warna t. 8 cm M2 J.40.Rob 93,800.00 -
38 Pas. Paving block natural t. 6 cm M2 J.41.Rob 83,700.00 -
39 Pas. Paving block natural t. 8 cm M2 J.42.Rob 91,780.00 -
40 Pas. Kansteen cetak beton Bh - 25,000.00 -
41 Pas. Border keramik 5/20 M' - 20,000.00 -
42 Pas. Water proofing plat beton reservoir M2 - 45,000.00 -
43 Pek. Pagar depan BRC d. 6 mm t. 1,20 M M' - - -
44 Pek. Pagar depan teralis besi t. 1,20 M M' - - -
JUMLAH III -
IV PEKERJAAN BETON
1 Pek. Cor beton site mix K. 175 M3 G.4a 778,172.00 -
2 Pek. Cor beton site mix K. 225 M3 G.4b 829,755.00 -
3 Pek. Cor beton ready mix K. 225 berikut selang M3 G.4e 947,525.00 -
4 Pek. Besi beton terpasang U. 24 Kg G.25a 14,387.00 -
5 Pek. Besi Hollow 40.40.2 M' - 150,000.00 -
6 Pek. Gantungan plafond besi d. 10 mm Kg G.4h 12,839.50 -
7 Pek. Baja IWF DN Kg G.4k 13,625.50 -
8 Pek. Konst. besi siku/profil EX DN Kg G.4l 13,835.50 -
9 Pek. Pengelasan dgn las listrik Cm G.4m 854.40 -
10 Melobang konstruksi besi dgn beton Titik G.4n 3,351.00 -
11 Pek. Begisting multiplek 9 mm M2 G.4p 101,314.50 -
MUTU BETON SITE MIX. K.175 -
1 Pek. Sloof 15/20 (166,67 Kg/M3) M3 G.4a+G.25a.1+G.29a 4,081,542.86 -
2 Pek. Sloof 15/25 (163,47 Kg/M3) M3 G.4a+G.25a.2+G.29b 4,035,504.46 -
3 Pek. Sloof 20/25 (140,40 Kg/M3) M3 G.4a+G.25a.3+G.29c 3,477,393.80 -
4 Pek. Sloof 20/30 (125,00 Kg/M3) M3 G.4a+G.25a.4+G.29d 3,255,834.00 -
5 Pek. Kolom praktis 12/12 (235,42 Kg/M3) M3 G.4a+G.25a.5+G.29e 5,297,530.97 -
6 Pek. Kolom selasar 20/20 (200,00 Kg/M3) M3 G.4a+G.25a.6+G.29f 5,014,146.00 -
7 Pek. Kolom 20/25 (180,80 Kg/M3) M3 G.4a+G.25a.7+G.29g 4,602,058.20 -
8 Pek. Kolom 25/25 (192,64 Kg/M3) M3 G.4a+G.25a.8+G.29h 4,636,542.88 -
9 Pek. Kolom 25/30 (200,53 Kg/M3) M3 G.4a+G.25a.9+G.29i 4,659,711.14 -
10 Pek. Kolom 30/30 (172,44 Kg/M3) M3 G.4a+G.25a.10+G.29j 4,164,555.85 -
11 Pek. Kolom 30/35 (179,43 Kg/M3) M3 G.4a+G.25a.11+G.29k 4,200,588.72 -
12 Pek. Kolom 40/40 (180,50 Kg/M3) M3 G.4a+G.25a.12+G.29l 4,054,312.50 -
13 Pek. Ring balk selasar 15/20 (166,67 Kg/M3) M3 G.4a+G.25a.13+G.29m 4,081,542.86 -
14 Pek. Ring balk selasar 15/25 (163,47 Kg/M3) M3 G.4a+G.25a.14+G.29n 4,307,219.26 -
15 Pek. Balok konsol selasar 15/30 (200,89 Kg/M3) M3 G.4a+G.25a.15+G.29o 4,800,408.22 -
16 Pek. Balok latei 10/20 (320,00 Kg/M3) M3 G.4a+G.25a.16+G.29p 6,740,586.00 -
17 Pek. Plat dak beton (152,42 Kg/M3) M3 G.4a+G.25a.17+G.29q 3,536,884.61 -
18 Pek. Plat dak beton (119,10 Kg/M3) M3 G.4a+G.25a.17a+G.29q1 3,170,950.70 -
19 Pek. Balok beton 20/30 (190,00 Kg/M3) M3 G.4a+G.25a.18+G.29r 4,417,191.57 -
20 Pek. Balok beton 20/40 (213,25 Kg/M3) M3 G.4a+G.25a.19+G.29s 4,695,308.50 -
21 Pek. Balok beton 25/50 (192,80 Kg/M3) M3 G.4a+G.25a.20+G.29t 4,231,272.60 -
22 Pek. Balok beton 30/60 (190,56 Kg/M3) M3 G.4a+G.25a.21+G.29u 4,085,604.79 -
23 Pek. Pondasi poor (105 Kg/M3) M3 G.4a+G.25a.22+G.29v 2,728,305.69 -
24 Pek. Pondasi plat t. 20 cm ( 166 Kg/M3 ) M3 G.4a+G.25a.23+G.29w 3,438,128.80 -
25 Pek. Pondasi plat t. 25 cm ( 137,80 Kg/M3 ) M3 G.4a+G.25a.24+G.29x 3,032,415.40 -
26 Pek. Pondasi plat t. 15 cm ( 208,87 Kg/M3 ) M3 G.4a+G.25a.25+G.29y 4,054,899.49 -
27 Pek. Balok 20/35 ( 217,71 Kg/M3 ) M3 G.4a+G.25a.26+G.29z 4,783,928.85 -
28 Pek. Balok 25/40 ( 204,60 Kg/M3 ) M3 G.4a+G.25a.27+G.29z1 4,435,003.55 -
29 Pek. Balok 25/45 ( 198,04 Kg/M3 ) M3 G.4a+G.25a.28+G.29z2 4,321,604.79 -
30 Pek. Balok 30/55 ( 187,27 Kg/M3 ) M3 G.4a+G.25a.29+G.29z3 4,049,140.15 -
31 Pek. Kolom 15/15 ( 211,56 Kg/M3 ) M3 G.4a+G.25a.30+G.29z4 5,633,544.15 -

Page 40
1 2 3 4 5 6
32 Pek. Kolom 15/20 ( 226,00 Kg/M3 ) M3 G.4a+G.25a.31+G.29z5 5,614,410.57 -
33 Pek. Kolom 15/25 ( 187,20 Kg/M3 ) M3 G.4a+G.25a.32+G.29z6 4,920,337.57 -
34 Pek. Kolom 15/30 ( 200,89 Kg/M3 ) M3 G.4a+G.25a.33+G.29z7 5,026,950.43 -
35 Pek. Kolom 20/30 ( 200,67 Kg/M3 ) M3 G.4a+G.25a.34+G.29z8 4,797,582.72 -
36 Pek. Kolom 30/40 ( 200,67 Kg/M3 ) M3 G.4a+G.25a.35+G.29z9 4,218,107.93 -
37 Pek. Kolom 50/50 ( 176,24 Kg/M3 ) M3 G.4a+G.25a.36+G.29z10 3,857,166.48 -
38 Pek. Kolom 35/35 ( 180,25 Kg/M3 ) M3 G.4a+G.25a.37+G.29z11 4,147,853.79 -
39 Pek. Kolom 45/45 ( 176,20 Kg/M3 ) M3 G.4a+G.25a.38+G.29z12 3,917,047.54 -
40 Pek. Plat listplank, kanopi ( 83,13 Kg/M3 ) M3 G.4a+G.25a.39+G.29z13 2,823,272.06 -
MUTU BETON SITE MIX. K. 225
1 Pek. Sloof 15/20 (166,67 Kg/M3) M3 G.4b+G.25a.1+G.29a 4,133,125.86 -
2 Pek. Sloof 15/25 (163,47 Kg/M3) M3 G.4b+G.25a.2+G.29b 4,087,087.46 -
3 Pek. Sloof 20/25 (140,40 Kg/M3) M3 G.4b+G.25a.3+G.29c 3,528,976.80 -
4 Pek. Sloof 20/30 (125,00 Kg/M3) M3 G.4b+G.25a.4 +G.29d 3,307,417.00 -
5 Pek. Kolom praktis 12/12 (235,42 Kg/M3) M3 G.4b+G.25a.5+G.29e 5,349,113.97 -
6 Pek. Kolom selasar 20/20 (200,00 Kg/M3) M3 G.4b+G.25a.6+G.29f 5,065,729.00 -
7 Pek. Kolom 20/25 (180,80 Kg/M3) M3 G.4b+G.25a.7+G.29g 4,653,641.20 -
8 Pek. Kolom 25/25 (192,64 Kg/M3) M3 G.4b+G.25a.8+G.29h 4,688,125.88 -
9 Pek. Kolom 25/30 (200,53 Kg/M3) M3 G.4b+G.25a.9+G.29i 4,711,294.14 -
10 Pek. Kolom 30/30 (172,44 Kg/M3) M3 G.4b+G.25a.10+G.29j 4,216,138.85 -
11 Pek. Kolom 30/35 (179,43 Kg/M3) M3 G.4b+G.25a.11+G.29k 4,252,171.72 -
12 Pek. Kolom 40/40 (180,50 Kg/M3) M3 G.4b+G.25a.12+G.29l 4,105,895.50 -
13 Pek. Ring balk selasar 15/20 (166,67 Kg/M3) M3 G.4b+G.25a.13+G.29m 4,133,125.86 -
14 Pek. Ring balk selasar 15/25 (163,47 Kg/M3) M3 G.4b+G.25a.14+G.29n 4,358,802.26 -
15 Pek. Balok konsol selasar 15/30 (200,89 Kg/M3) M3 G.4b+G.25a.15+G.29o 4,851,991.22 -
16 Pek. Balok latei 10/20 (320,00 Kg/M3) M3 G.4b+G.25a.16+G.29p 6,792,169.00 -
17 Pek. Plat dak beton (152,42 Kg/M3) M3 G.4b+G.25a.17+G.29q 3,588,467.61 -
18 Pek. Plat dak beton (119,10 Kg/M3) M3 G.4b+G.25a.17a+G.29q1 3,222,533.70 -
19 Pek. Balok beton 20/30 (190,00 Kg/M3) M3 G.4b+G.25a.18+G.29r 4,468,774.57 -
20 Pek. Balok beton 20/40 (213,25 Kg/M3) M3 G.4b+G.25a.19+G.29s 4,746,891.50 -
21 Pek. Balok beton 25/50 (192,80 Kg/M3) M3 G.4b+G.25a.20+G.29t 4,282,855.60 -
22 Pek. Balok beton 30/60 (190,56 Kg/M3) M3 G.4b+G.25a.21+G.29u 4,137,187.79 -
23 Pek. Pondasi poor (105 Kg/M3) M3 G.4b+G.25a.22+G.29v 2,779,888.69 -
24 Pek. Pondasi plat t. 20 cm ( 166 Kg/M3 ) M3 G.4b+G.25a.23+G.29w 3,489,711.80 -
25 Pek. Pondasi plat t. 25 cm ( 137,80 Kg/M3 ) M3 G.4b+G.25a.24+G.29x 3,083,998.40 -
26 Pek. Pondasi plat t. 15 cm ( 208,87 Kg/M3 ) M3 G.4b+G.25a.25+G.29y 4,106,482.49 -
27 Pek. Balok 20/35 ( 217,71 Kg/M3 ) M3 G.4b+G.25a.26+G.29z 4,835,511.85 -
28 Pek. Balok 25/40 ( 204,60 Kg/M3 ) M3 G.4b+G.25a.27+G.29z1 4,486,586.55 -
29 Pek. Balok 25/45 ( 198,04 Kg/M3 ) M3 G.4b+G.25a.28+G.29z2 4,373,187.79 -
30 Pek. Balok 30/55 ( 187,27 Kg/M3 ) M3 G.4b+G.25a.29+G.29z3 4,100,723.15 -
31 Pek. Kolom 15/15 ( 211,56 Kg/M3 ) M3 G.4b+G.25a.30+G.29z4 5,685,127.15 -
32 Pek. Kolom 15/20 ( 226,00 Kg/M3 ) M3 G.4b+G.25a.31+G.29z5 5,665,993.57 -
33 Pek. Kolom 15/25 ( 187,20 Kg/M3 ) M3 G.4b+G.25a.32+G.29z6 4,971,920.57 -
34 Pek. Kolom 15/30 ( 200,89 Kg/M3 ) M3 G.4b+G.25a.33+G.29z7 5,078,533.43 -
35 Pek. Kolom 20/30 ( 200,67 Kg/M3 ) M3 G.4b+G.25a.34+G.29z8 4,849,165.72 -
36 Pek. Kolom 30/40 ( 200,67 Kg/M3 ) M3 G.4b+G.25a.35+G.29z9 4,269,690.93 -
37 Pek. Kolom 50/50 ( 176,24 Kg/M3 ) M3 G.4b+G.25a.36+G.29z10 3,908,749.48 -
38 Pek. Kolom 35/35 ( 180,25 Kg/M3 ) M3 G.4b+G.25a.37+G.29z11 4,199,436.79 -
39 Pek. Kolom 45/45 ( 176,20 Kg/M3 ) M3 G.4b+G.25a.38+G.29z12 3,968,630.54 -
40 Pek. Plat listplank, kanopi ( 83,13 Kg/M3 ) M3 G.4b+G.25a.39+G.29z13 2,874,855.06 -
MUTU BETON READY MIX. K. 225
1 Pek. Sloof 15/20 (166,67 Kg/M3) M3 G.4e+G.25a.1+G.29a 4,250,895.86 -
2 Pek. Sloof 15/25 (163,47 Kg/M3) M3 G.4e+G.25a.2+G.29b 4,204,857.46 -
3 Pek. Sloof 20/25 (140,40 Kg/M3) M3 G.4e+G.25a.3+G.29c 3,646,746.80 -
4 Pek. Sloof 20/30 (125,00 Kg/M3) M3 G.4e+G.25a.4 +G.29d 3,425,187.00 -
5 Pek. Kolom praktis 12/12 (235,42 Kg/M3) M3 G.4e+G.25a.5+G.29e 5,466,883.97 -
6 Pek. Kolom selasar 20/20 (200,00 Kg/M3) M3 G.4e+G.25a.6+G.29f 5,183,499.00 -
7 Pek. Kolom 20/25 (180,80 Kg/M3) M3 G.4e+G.25a.7+G.29g 4,771,411.20 -
8 Pek. Kolom 25/25 (192,64 Kg/M3) M3 G.4e+G.25a.8+G.29h 4,805,895.88 -
9 Pek. Kolom 25/30 (200,53 Kg/M3) M3 G.4e+G.25a.9+G.29i 4,829,064.14 -
10 Pek. Kolom 30/30 (172,44 Kg/M3) M3 G.4e+G.25a.10+G.29j 4,333,908.85 -
11 Pek. Kolom 30/35 (179,43 Kg/M3) M3 G.4e+G.25a.11+G.29k 4,369,941.72 -
12 Pek. Kolom 40/40 (180,50 Kg/M3) M3 G.4e+G.25a.12+G.29l 4,223,665.50 -

Page 41
1 2 3 4 5 6
13 Pek. Ring balk selasar 15/20 (166,67 Kg/M3) M3 G.4e+G.25a.13+G.29m 4,250,895.86 -
14 Pek. Ring balk selasar 15/25 (163,47 Kg/M3) M3 G.4e+G.25a.14+G.29n 4,476,572.26 -
15 Pek. Balok konsol selasar 15/30 (200,89 Kg/M3) M3 G.4e+G.25a.15+G.29o 4,969,761.22 -
16 Pek. Balok latei 10/20 (320,00 Kg/M3) M3 G.4e+G.25a.16+G.29p 6,909,939.00 -
17 Pek. Plat dak beton (152,42 Kg/M3) M3 G.4e+G.25a.17+G.29q 3,706,237.61 -
18 Pek. Plat dak beton (119,10 Kg/M3) M3 G.4e+G.25a.17a+G.29q1 3,340,303.70 -
19 Pek. Balok beton 20/30 (190,00 Kg/M3) M3 G.4e+G.25a.18+G.29r 4,586,544.57 -
20 Pek. Balok beton 20/40 (213,25 Kg/M3) M3 G.4e+G.25a.19+G.29s 4,864,661.50 -
21 Pek. Balok beton 25/50 (192,80 Kg/M3) M3 G.4e+G.25a.20+G.29t 4,400,625.60 -
22 Pek. Balok beton 30/60 (190,56 Kg/M3) M3 G.4e+G.25a.21+G.29u 4,254,957.79 -
23 Pek. Pondasi poor (105 Kg/M3) M3 G.4e+G.25a.22+G.29v 2,897,658.69 -
24 Pek. Pondasi plat t. 20 cm ( 166 Kg/M3 ) M3 G.4e+G.25a.23+G.29w 3,607,481.80 -
25 Pek. Pondasi plat t. 25 cm ( 137,80 Kg/M3 ) M3 G.4e+G.25a.24+G.29x 3,201,768.40 -
26 Pek. Pondasi plat t. 15 cm ( 208,87 Kg/M3 ) M3 G.4e+G.25a.25+G.29y 4,224,252.49 -
27 Pek. Balok 20/35 ( 217,71 Kg/M3 ) M3 G.4e+G.25a.26+G.29z 4,953,281.85 -
28 Pek. Balok 25/40 ( 204,60 Kg/M3 ) M3 G.4e+G.25a.27+G.29z1 4,604,356.55 -
29 Pek. Balok 25/45 ( 198,04 Kg/M3 ) M3 G.4e+G.25a.28+G.29z2 4,490,957.79 -
30 Pek. Balok 30/55 ( 187,27 Kg/M3 ) M3 G.4e+G.25a.29+G.29z3 4,218,493.15 -
31 Pek. Kolom 15/15 ( 211,56 Kg/M3 ) M3 G.4e+G.25a.30+G.29z4 5,802,897.15 -
32 Pek. Kolom 15/20 ( 226,00 Kg/M3 ) M3 G.4e+G.25a.31+G.29z5 5,783,763.57 -
33 Pek. Kolom 15/25 ( 187,20 Kg/M3 ) M3 G.4e+G.25a.32+G.29z6 5,089,690.57 -
34 Pek. Kolom 15/30 ( 200,89 Kg/M3 ) M3 G.4e+G.25a.33+G.29z7 5,196,303.43 -
35 Pek. Kolom 20/30 ( 200,67 Kg/M3 ) M3 G.4e+G.25a.34+G.29z8 4,966,935.72 -
36 Pek. Kolom 30/40 ( 200,67 Kg/M3 ) M3 G.4e+G.25a.35+G.29z9 4,387,460.93 -
37 Pek. Kolom 50/50 ( 176,24 Kg/M3 ) M3 G.4e+G.25a.36+G.29z10 4,026,519.48 -
38 Pek. Kolom 35/35 ( 180,25 Kg/M3 ) M3 G.4e+G.25a.37+G.29z11 4,317,206.79 -
39 Pek. Kolom 45/45 ( 176,20 Kg/M3 ) M3 G.4e+G.25a.38+G.29z12 4,086,400.54 -
40 Pek. Plat listplank, kanopi ( 83,13 Kg/M3 ) M3 G.4e+G.25a.39+G.29z13 2,992,625.06 -
JUMLAH IV -
V PEKERJAAN KAYU
1 Pek. Kuda-kuda & Gording Kayu Kamper M3 F.28 10,261,200.00 -
2 Pek. Gording Kayu Kamper M3 F.28a 9,659,000.00 -
3 Pek. Kuda-kuda & Gording Kayu Borneo M3 F.29 5,811,700.00 -
4 Pek. Gording Kayu Borneo M3 F.29a 5,209,500.00 -
5 Pek. Kuda-kuda & Gording Kayu Kruing M3 F.30 7,377,000.00 -
6 Pek. Gording Kayu Kruing M3 F.30a 6,774,800.00 -
7 Pek. Kuda-kuda & Gording Kayu lama M3 F.30Rob 1,059,700.00 -
8 Pek. Kusen-kusen kayu Kamper M3 F.2 11,383,500.00 -
9 Pek. Kusen-kusen kayu borneo M3 F.3 6,529,500.00 -
10 Pek. Kusen-kusen kayu Kruing M3 F.4 8,237,100.00 -
11 Pek. Daun pintu Alumunium putih Lengkap tanpa kaca Unit - 1,303,000.00 -
12 Pek. Daun pintu Alumunium coklat Lengkap tanpa kaca Unit - 1,498,000.00 -
13 Pek. Kusen Alumunium standar natural 4" M' - 113,000.00 -
14 Pek. Kusen Alumunium standar natural 3" M' - 85,000.00 -
15 Pek. Kusen Alumunium warna doft 4" M' - 130,000.00 -
16 Pek. Kusen Alumunium warna doft 3" M' - 98,000.00 -
17 Pek. Daun jendela Alumunium putih lengkap tanpa kaca Unit - 283,000.00 -
18 Pek. Daun jendela Alumunium coklat lengkap tanpa kaca Unit - 326,000.00 -
19 Pek. Polycarbonat + kerangka besi M2 - 397,000.00 -
20 Pek. Polycarbonat + kerangka stainlestil M2 - 680,000.00 -
21 Pek. Foldinggate (pintu lipat) M2 - 574,000.00 -
22 Pek. Roling door ( grille ) M2 - 425,000.00 -
23 Pek. Rangka atap genteng morando Kayu Borneo M2 F.35 64,584.00 -
24 Pek. Rangka atap genteng morando Kayu Kruing M2 F.35b 85,627.00 -
25 Pek. Rangka atap genteng tegola Kayu Borneo M2 F.35Rob 53,367.00 -
26 Pek. Rangka atap genteng plentong Kayu Borneo M2 F.32 64,584.00 -
27 Pek. Rangka atap genteng plentong Kayu Kruing M2 F.32a 77,031.00 -
28 Pek. Rangka atap kaso lama reng Kayu Kruing M2 F.32a.Rob 25,455.00 -
29 Pek. Rangka atap kaso lama reng Kayu Borneo M2 F.32c.Rob 23,712.00 -
30 Pek. Rangka atap kaso + reng genteng plentong dolken M2 F.32b 34,745.00 -
31 Pek. Rangka atap kaso dolken + reng bambu, atap ijuk M2 F.32b.Rob 28,895.00 -
32 Pek. Rangka atap kaso dolken+reng ky borneo gtng plentong M2 F.32c 32,612.00 -
33 Pek. Daun pintu panil Kayu Kamper M2 F.8 561,360.00 -
34 Pek. Daun pintu panil Kayu Kruing M2 F.8b 456,160.00 -
35 Pek. Daun pintu double teackwood rangka Kayu Kamper M2 F.20 430,606.40 -

Page 42
1 2 3 4 5 6
36 Pek. Daun pintu panel multiplek t. 9 mm rk.ky Kamper M2 F.20a 438,856.40 -
37 Pek. Teack wood untuk pelapis timbal M2 F.20b.Rob 121,825.00 -
38 Pek. Daun pintu dan jendela kaca kayu Kamper M2 F.10 476,790.00 -
39 Pek. Daun pintu dan jendela kaca kayu Kruing M2 F.11.a 384,740.00 -
40 Pek. Daun pintu double triplek kayu Lama M2 - 145,550.00 -
41 Pek. Rangka Dinding triplek 6 mm kayu borneo M2 F.55 170,819.00 -
42 Pek. Dinding penyekat teakwood Kayu Kamper M2 F.56 370,209.50 -
43 Pek. Dinding penyekat teakwood Kayu borneo M2 F.57 260,798.00 -
44 Pek. Dinding pemisah multiplek 9 mm rk. Kayu kruing M2 F.57.Rob 258,670.50 -
44 Pek. Dinding penyekat dari triplek ky. borneo M2 F.57a 215,048.00 -
45 Pek. Dinding penyekat teakwood rangka ky. kruing M2 F.57b 300,670.50 -
46 Pek. Papan listplank 3/20 kayu Kruing M' F.48b 64,513.80 -
47 Pek. Papan listplank 3/5 kayu Bormeo M' F.48c 25,734.60 -
48 Pek. Papan listplank 3/30 kayu Kruing M' F.50b 91,193.00 -
49 Pek. Papan listplank Tumpangsari 3/30+2/10 ky Kruing M' F.51b 122,318.00 -
50 Pek. Papan listplank GRC tumpangsari (1/20+1/10) M' F.51b.Rob 15,220.00 -
51 Pek. Papan listplank GRC tumpangsari (1/30+1/10) M' F.51c.Rob 24,420.00 -
52 Pek. Plafond Triplek rangka Kayu Borneo M' I.21 113,389.56 -
53 Pek. Plafond Triplek rangka kayu lama M' I.22 61,549.56 -
54 Pek. Plafond Lambersering ky 9 cm M' I.21Rob 236,949.56 -
55 Pek. Plafond plat asbes rangka Kayu Borneo M2 I.20 96,759.00 -
56 Pek. Plafond plat asbes rangka kayu lama M2 I.20Rob 44,919.00 -
57 Pek. Plafond plat asbes rangka kayu kruing M2 I.20a 113,835.00 -
58 Pek. Plafond eternit rangka Kayu Borneo M2 I.20b 87,409.00 -
59 Pek. Plafond eternit rangka Kayu lama M2 I.20b.Rob 35,569.00 -
60 Pek. Plafond GRC rangka ky borneo M2 I.20c 100,939.00 -
61 Pek. Plafond GRC rangka ky lama M2 I.20c.Rob 46,028.72 -
62 Pek. Plafond GRC rangka metal fooring M2 - 125,000.00 -
63 Pek. Plafond gypsum tanpa rangka M2 I.24 60,469.00 -
64 Pek. Plafond gypsum berikut rangka Kayu Borneo M2 I.24a 113,269.00 -
65 Pek. Talang datar seng BJLS 28 berikut papan M' K.18 105,130.70 -
66 Pek. Talang jurai seng BJLS 28 berikut papan M' K.19 148,357.50 -
67 Pek. Pasangan jalusi mati kusen kayu Kruing M2 F.17b 540,165.00 -
68 Pek. Pintu Super Vinyl KM/WC Bh - 375,000.00 -
69 Pek. Rooster kayu 20/30 Bh - 25,000.00 -
70 Pek. List plafond Kayu Kruing profil M' F.60 6,206.00 -
71 Pek. List gypsum t.10 cm M' - 15,000.00 -
JUMLAH V -
VI PEKERJAAN PENUTUP ATAP
1 Pas. Kuda-kuda rangka atap baja ringan zincallume M2 - 176,000.00 -
2 Pas. Penutup atap genteng morando natural M2 H.2c 55,651.00 -
3 Pas. Penutup atap genteng morando glazuur M2 H.2e 64,651.00 -
4 Pas. Penutup atap genteng press plentong ex. Jatiwangi M2 H.1 38,151.00 -
5 Pas. Penutup atap genteng lama M2 H.2f 10,651.00 -
6 Pas. Penutup atap genteng metal pooring M2 - 125,000.00 -
7 Pas. Penutup atap genteng tegola M2 - 150,000.00 -
8 Pek. Bubungan genteng morando glazuur M' H.5e 65,361.20 -
9 Pek. Bubungan genteng morando natural M' H.5c 57,361.20 -
10 Pek. Bubungan genteng plentong press Ex. Jatiwangi M' H.4 51,861.20 -
11 Pek. Atap asbes gelombang (2,4 x 1,05 M) tebal 4 mm M2 H.8a 54,531.00 -
12 Pek. Atap asbes gelombang (2,5 x 0,92 M) tebal 5 mm M2 H.8 55,631.00 -
13 Pek. Atap asbes gelombang (2,25 x 0,92 M) tebal 5 mm M2 H.9 59,121.00 -
14 Pek. Atap asbes gelombang (2,25 x 0,92 M) tebal 4 mm M2 H.9a 57,381.00 -
15 Pek. Atap seng gelombang BJLS 28 M2 H.9b 48,681.00 -
16 Pek. Bubungan Nok stell gelombang M' H.22 43,684.00 -
17 Pek. Atap asbes gelombang (2,25x0,92 M) t.5 mm M' H.10 61,521.00 -
18 Pas. Atap asbes gelombang lama M2 H.10.Rob 18,681.00 -
JUMLAH VI -
VII PEKERJAAN KUNCI DAN KACA
1 Pas. Kaca polos t. 5 mm M2 L.17 118,612.00 -
2 Pas. Kaca rayband t. 5 mm M2 L.17a 121,912.00 -
3 Pas. Kunci tanam double slaag (besar) Bh L.2 108,765.00 -
4 Pas. Engsel pintu Bh L.5 30,708.75 -
5 Pas. Engsel jendela Bh L.6 21,972.50 -
6 Pas. Grendel pintu / jendela (kunci selot) Bh L.11 19,472.50 -
7 Pas. Kait angin Bh L.9 17,708.75 -
8 Pas. Expanolete Bh - - -
JUMLAH VII -

Page 43
1 2 3 4 5 6
VIII PEKERJAAN PENGECATAN
1 Pengecatan dinding tembok baru M2 N.14 14,097.60 -
2 Pengecatan dinding tembok lama M2 N.15 10,741.90 -
3 Pengecatan plafond baru M2 N.14 14,097.60 -
4 Pengecatan plafond lama M2 N.15 10,741.90 -
5 Pengecatan bidang kayu yang tampak M2 N.9 43,060.50 -
6 Pengecatan Kansteen M2 N.8a 18,222.50 -
7 Pengecatan bidang kayu lama M2 N.7 27,651.75 -
8 Plisturan daun pintu M2 N.11 42,484.50 -
9 Pek. Laburan residu kuda2 dan rangka atap M2 N.12 8,290.00 -
10 Pengecatan baja dengan meni besi M2 N.20 15,480.00 -
11 Pengecatan besi M2 N.21 43,335.00 -
JUMLAH VIII -
IX PEKERJAAN INSTALASI LISTRIK
1 Biaya Penyambungan Listik 1300 Watt Ls - 3,000,000.00 -
2 Biaya Penyambungan Listik 900 Watt Ls - 1,500,000.00 -
3 Instalasi titik cahaya berikut bahan & pasang standar PLN Ttk - 125,000.00 -
4 Pas. Saklar tunggal Bh - 18,000.00 -
5 Pas. Saklar double Bh - 23,500.00 -
6 Pas. Stop kontak Bh - 18,000.00 -
7 Pas. Stop kontak AC Bh - 150,000.00 -
8 Pas. Lampu capsul 18 watt Bh - 33,600.00 -
9 Pas. Lampu capsul 9 watt Bh - 27,000.00 -
10 Pas. Armatur Tl 2 x 40 watt + kap Bh - 170,000.00 -
11 Pas. Armatur Tl 2 x 20 watt + kap Bh - 147,000.00 -
12 Pas. Armatur lampu pijar 25 Watt Bh - 6,000.00 -
13 Arde / Grouding panel Ls - - -
JUMLAH IX -
X PEKERJAAN SANITARY
1 Pas. Instalasi air bersih Pipa PVC 1/2" M' J.25 11,111.00 -
2 Pas. Instalasi air bersih Pipa PVC 3/4" M' J.26 12,971.00 -
3 Pas. Instalasi air kotor Pipa PVC 3" M' J.31 47,943.00 -
4 Pas. Instalasi air kotor Pipa PVC 4" M' J.32 97,078.00 -
5 Pas. Bak cuci piring stainles steel Bh J.33 326,517.50 -
6 Kran air tembok kait 1/2" KIT + sambungan Bh J.35 27,017.50 -
7 Floor drain plastik KM/WC 2,5" Bh J.36 16,465.00 -
8 Floor drain kuningan KM/WC 2,5" Bh J.36.Rob 36,465.00 -
9 Stop kran KIT 3/4" Bh - 54,000.00 -
10 Dop kuningan penguras bak d. 3/4" Bh - 15,000.00 -
11 Dop plastik penguras bak d. 3/4" Bh - 5,000.00 -
12 Closet jongkok porselin Bh J.2 259,123.00 -
13 Closet duduk porselin Bh J.1 1,209,757.00 -
14 Wastafel standard lengkap Bh J.5 622,050.00 -
15 Urinoar Keet lengkap accessories stop kran KIT Bh J.4 1,291,200.00 -
16 Membuat bak air bata lapis keramik Bh J.8 877,050.40 -
17 Bak kontrol pas. batu bata (30x30) cm t. 35 cm Bh J.16 203,692.00 -
18 Bak kontrol pas. batu bata (45x45) cm t. 50 cm Bh J.17 281,121.00 -
19 Septicktank berikut rembesan uk. 2,5x1,5x2 Unit J.36a 8,148,749.73 -
20 Septicktank berikut rembesan uk. 2,5x1,5x1,5 Unit J.36b 4,891,478.53 -
21 Septicktank berikut rembesan uk. 1,5x1x1,5 Unit J.36c 3,023,663.08 -
22 Pas. Pompa air jetpump 37 WATT Bh - - -
23 Pas. Pompa air jetpump 500 WATT Bh - 750,000.00 -
24 Pas. Sumur pompa tangan (SPT) Bh - 1,500,000.00 -
25 Pas. Saluran grevel buis beton 1/2 d. 20 M' J.37 135,440.20 -
26 Pas. Saluran grevel buis beton 1/2 d. 30 M' J.38 149,810.20 -
JUMLAH X -
XI PENGADAAN MEUBELAIR
1 Kursi Murid Bh - - -
2 Meja Murid Bh - - -
3 Kursi Guru Bh - - -
4 Meja Guru Bh - - -
5 Meja biro Bh - - -
6 Lamari Arsip Bh - - -

Page 44
1 2 3 4 5 6
7 Rak Buku Bh - - -
8 Papan Tulis Bh - - -
9 Kursi Tamu Bh - - -
JUMLAH XI -
REKAPITULASI :
I PEKERJAAN PERSIAPAN ………… ………………………………………
………………….. -
II PEKERJAAN TANAH ………… ………………………………………
………………….. -
III PEK. PASANGAN DAN PLESTERAN ………… ………………………………………
………………….. -
IV PEKERJAAN BETON ………… ………………………………………
………………….. -
V PEKERJAAN KAYU ………… ………………………………………
………………….. -
VI PEKERJAAN PENUTUP ATAP ………… ………………………………………
………………….. -
VII PEKERJAAN KUNCI DAN KACA ………… ………………………………………
………………….. -
VIII PEKERJAAN PENGECATAN ………… ………………………………………
………………….. -
IX PEKERJAAN INSTALASI LISTRIK ………… ………………………………………
………………….. -
X PEKERJAAN SANITARY ………… ………………………………………
………………….. -
XI PENGADAAN MEUBELAIR ………… ………………………………………
………………….. -
Sub Total -
PPN 10% -
Total -
Dibulatkan -
Biaya Umum -
TOTAL -

TERBILANG : (

Indramayu, 2011

MENGETAHUI :
KEPALA DINAS CIPTA KARYA KABID TATA BANGUNAN
KABUPATEN INDRAMAYU DINAS CIPTA KARYA KAB. INDRAMAYU

Drs. SUSANTO, BAE AGUS SUPRIYADI, BE


Pembina Tingkat I NIP. 19590803 198802 1 001
NIP. 19591229 198603 1 011

Page 45