RENCANA ANGGARAN BIAYA (RAB)

PEMBANGUNAN ASRAMA PUTRA


KECAMATAN LOHBENER - KABUPATEN INDRAMAYU
PEMBANGUNAN 1 RUANG PEMBELAJARAN TEORI (lantai bawah)

HARGA SATUAN JUMLAH JUMLAH TOTAL


NO. JENIS PEKERJAAN VOLUME ANALISA HARGA BAHAN
HARGA UPAH (Rp) JUMLAH (3X5) JUMLAH (3X6) (7+8)
(Rp)
1 2 3 4 5 6 7 8 9

A LANTAI 1
I. PEKERJAAN PERSIAPAN
1 Biaya Administrasi dan Akomodasi 1.00 Ls Ls - 3,000,000.00 0.00 3,000,000.00 3,000,000.00
2 Pek. Pas. Bowplank 115.25 M' A.1a 13,600.00 34,377.20 1,567,400.00 3,961,972.30 5,529,372.30
3 Pek. Steger 639.00 M2 A-15 4,400.00 27,750.00 2,811,600.00 17,732,250.00 20,543,850.00
4 Pek. Stootwerk 101.14 M2 A.11.c 39,780.00 85,200.00 4,023,349.20 8,617,128.00 12,640,477.20
JUMLAH I 1,567,400.00 6,961,972.30 41,713,699.50

II. PEKERJAAN TANAH DAN PASIR


1 Pek. Galian tanah Pondasi 328.52 M3 B.1. 35,720.00 - 11,734,734.40 0.00 11,734,734.40
2 Urg. Kembali bekas galian pondasi 82.13 M3 B.9. 12,270.00 - 1,007,735.10 0.00 1,007,735.10
3 Pek. Urg. Tanah alas lantai T .50 cm 319.50 M3 B.10. 32,000.00 - 10,224,000.00 0.00 10,224,000.00
4 Pek. Urg. Pasir alas lantai 63.90 M3 B.11. 17,400.00 111,000.00 1,111,860.00 7,092,900.00 8,204,760.00
5 Pek. Urg. Pasir alas pondasi T. 10 cm 33.18 M3 B.11. 35,720.00 - 1,185,046.72 0.00 1,185,046.72
JUMLAH II 25,263,376.22 7,092,900.00 32,356,276.22

III. PEKERJAAN PASANGAN


1 Pas Batu kosong ( Aanstamping ) 48.32 M3 C.14. 76,830.00 270,150.00 3,712,425.60 13,053,648.00 16,766,073.60
2 Pek. Pondasi batu belah 1Pc : 5 Ps ( batu kali ) 72.48 M3 C.6. 136,050.00 509,162.80 9,860,904.00 36,904,119.74 46,765,023.74
3 Pek. Lantai kerja (Beton Tumbuk) 1Pc:3Ps:5Kr 31.95 M3 G.1. 117,450.00 568,786.00 3,752,527.50 18,172,712.70 21,925,240.20
4 Pas. Bata dinding 1 Pc : 5 Ps 958.52 M2 D.12. 26,750.00 60,274.00 25,640,410.00 57,773,834.48 83,414,244.48
5 Plesteran dinding + Acian 1Pc : 5 Ps 1,917.04 M2 E.4e. 26,360.00 10,562.80 50,533,174.40 20,249,310.11 70,782,484.51
JUMLAH III 93,499,441.50 146,153,625.04 239,653,066.54

IV. PEKERJAAN BETON K225


1 Pek. Sloof 20/30 18.12 M3 G.4b+G.25a.4+G.29d. 751,435.00 2,942,339.70 13,616,002.20 53,315,195.36 66,931,197.56
2 Pek. Kolom Struktur 30/35 21.65 M3 G.4b+G.25a.11+G.29k. 990,441.75 3,737,044.90 21,447,520.88 80,923,838.84 102,371,359.72
3 Pek. Kolom 12/12 1.38 M3 G.4b+G.25a.5+G.29e. 1,279,939.75 4,648,057.04 1,769,388.71 6,425,474.05 8,194,862.76
4 Pek. Balok Induk 30/60 25.65 M3 G.4b+G.25a.21+G.29u. 931,818.15 3,669,166.11 23,901,135.55 94,114,110.70 118,015,246.25
5 Pek. Balok anak 20/30 17.92 M3 G.4b+G.25a.18+G.29r. 1,048,414.35 3,916,144.66 18,787,585.15 70,177,312.29 88,964,897.44
6 Pek. Balok teras 20/25 1.26 M3 G.4b+G.25a.18+G.29r. 1,048,414.35 3,916,144.66 1,321,002.08 4,934,342.27 6,255,344.35
7 Pek. Plat lantai t.12 cm 75.24 M3 G.4b+G.25a.17+G.29q 803,858.45 3,196,992.91 60,482,309.78 240,541,746.48 301,024,056.26
8 Pek. Pasangan profil kanopi 4.80 M3 G.4a+G.25a.39+G.29z.13 670,398.65 2,484,261.78 3,217,913.52 11,924,456.52 15,142,370.04
9 Pek. Pondasi Plat 1.2 x 1.2 19.87 M3 G.4b+G.25a.24+G.29x 652,209.00 2,796,110.08 12,960,697.25 55,564,299.51 68,524,996.76
JUMLAH IV 157,503,555.11 617,920,776.03 775,424,331.14

V. PEKERJAAN LANTAI
1 Pas. Lantai keramik putih polos 40x40 639.00 M2 M.5a 44,254.50 55,909.50 28,278,625.50 35,726,170.50 64,004,796.00
JUMLAH V 28,278,625.50 35,726,170.50 64,004,796.00

VI. PEKERJAAN KUSEN KAYU BORNEO


1 Pek. Kusen pintu, jendela 3.37 M3 F.3. 1,777,000.00 5,702,400.00 5,981,382.00 19,194,278.40 25,175,660.40
2 Pek. Daun pintu dan jendela 52.86 M2 F.11a. 203,600.00 254,254.00 10,761,807.36 13,439,256.23 24,201,063.59
JUMLAH VI 16,743,189.36 32,633,534.63 49,376,723.99

VII. PEKERJAAN BESI DAN KACA


1 Pemas. kunci tanam double slaag 8.00 Bh L.2 36,800.00 108,200.00 294,400.00 865,600.00 1,160,000.00
2 Pek. Pemas. engsel pintu 48.00 Bh L.5 12,592.50 23,100.00 604,440.00 1,108,800.00 1,713,240.00
3 Pek. Pemas. engsel jendela 48.00 Bh L.6 8,395.00 17,000.00 402,960.00 816,000.00 1,218,960.00
4 Pek. Pemas. grendel pintu 32.00 Bh L.11 8,395.00 14,300.00 268,640.00 457,600.00 726,240.00
5 Pek. Pemas. grendel jendela 32.00 Bh L.11 8,395.00 14,300.00 268,640.00 457,600.00 726,240.00
6 Pek. Pemas. kait jendela 48.00 Bh L.9 12,592.50 8,800.00 604,440.00 422,400.00 1,026,840.00
7 Pas. Kaca polos 5 mm 22.84 M2 L.17 12,597.00 119,790.00 287,715.48 2,736,003.60 3,023,719.08
JUMLAH VII 2,731,235.48 6,864,003.60 9,595,239.08

VIII. PEKERJAAN CAT


1 Pengecatan dinding tembok 1,917.04 M2 N.14 6,239.00 10,491.00 11,960,412.56 20,111,666.64 32,072,079.20
2 Pengecatan kusen, 7.53 M2 N.8 5,185.00 34,003.00 39,058.61 256,144.60 295,203.20
3 Pengecatan daun jendela, pintu 105.72 M2 N.8 5,185.00 34,003.00 548,133.31 3,594,633.95 4,142,767.26
JUMLAH VIII 12,547,604.48 23,962,445.18 36,510,049.66

IX. PEKERJAAN INST. LISTRIK


1 Pek. Pas. Titik lampu komplit 109.00 TTK Ls - 86,000.00 0.00 9,374,000.00 9,374,000.00
2 Pas. Stop kontak 32.00 Bh Ls - 19,800.00 0.00 633,600.00 633,600.00
3 Pas. Saklar 16.00 Bh Ls - 25,800.00 0.00 412,800.00 412,800.00
4 Pas. Lampu 61.00 Bh Ls - 37,400.00 0.00 2,281,400.00 2,281,400.00
JUMLAH IX 0.00 12,701,800.00 12,701,800.00
X. PEKERJAAN SANITASI
1 Pas. Toilet Cubical 2.00 Unit Ls - 10,000,000.00 0.00 20,000,000.00 20,000,000.00
2 Pek. Kloset jongkok 8.00 Unit Ls - 3,000,000.00 0.00 24,000,000.00 24,000,000.00
JUMLAH X 0.00 44,000,000.00 44,000,000.00

XI. PEKERJAAN TANGGA


1 Pek. Tangga 1.00 Unit Ls - 20,000,000.00 0.00 20,000,000.00 20,000,000.00
JUMLAH X 0.00 20,000,000.00 20,000,000.00
JUMLAH LANTAI I 338,134,427.65 890,017,227.28 1,325,335,982.13

B LANTAI 2
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Urg. Pasir alas lantai 63.90 M3 B.11. 17,400.00 111,000.00 1,111,860.00 7,092,900.00 8,204,760.00
JUMLAH I 1,111,860.00 7,092,900.00 8,204,760.00

II. PEKERJAAN PASANGAN


1 Pek. Lantai kerja (Beton Tumbuk) 1Pc:3Ps:5Kr 31.95 M3 G.1. 117,450.00 568,786.00 3,752,527.50 18,172,712.70 21,925,240.20
2 Pas. Bata dinding 1 Pc : 5 Ps 1,082.88 M2 D.12. 26,750.00 60,274.00 28,967,040.00 65,269,509.12 94,236,549.12
3 Plesteran dinding + Acian 1Pc : 5 Ps 2,165.76 M2 E.4e. 26,360.00 10,562.80 57,089,433.60 22,876,489.73 79,965,923.33
JUMLAH II 89,809,001.10 106,318,711.55 196,127,712.65

III. PEKERJAAN BETON K 175


1 Pek. Kolom Struktur 25/25 11.50 M3 G.4a+G.25a.8+G.29.h 1,120,737.20 4,017,733.52 12,888,477.80 46,203,935.48 59,092,413.28
2 Pek. Kolom Praktis 12/12 1.73 M3 G.4a+G.25a.5+G.29e. 1,280,139.75 4,581,374.04 2,212,081.49 7,916,614.34 10,128,695.83
3 Pek. Ring balk 15/20 9.06 M3 G.4a+G.25a.13+G.29m. 970,342.20 3,560,636.26 8,791,300.33 32,259,364.51 41,050,664.84
4 Pek. Balok Letei 12/12 0.72 M3 G.4a+G.25a.16+G.29p. 1,642,810.00 5,797,579.40 1,182,823.20 4,174,257.17 5,357,080.37
5 Pek. Pasangan profil kanopi 2.40 M G.4a+G.25a.39+G.29z.13 670,398.65 2,484,261.78 1,608,956.76 5,962,228.26 7,571,185.02
JUMLAH III 26,683,639.58 96,516,399.76 123,200,039.34

IV. PEKERJAAN LANTAI


1 Pas. Lantai keramik putih polos 40x40 639.00 M2 M.5a 44,254.50 55,909.50 28,278,625.50 35,726,170.50 64,004,796.00
JUMLAH IV 28,278,625.50 35,726,170.50 64,004,796.00
V. PEKERJAAN KUSEN KAYU BORNEO
1 Pek. Kusen pintu, jendela, ventilasi 3.37 M3 F.3. 1,777,000.00 5,702,400.00 5,981,382.00 19,194,278.40 25,175,660.40
2 Pek. Daun pintu dan jendela 52.86 M2 F.11a. 203,600.00 254,254.00 10,761,807.36 13,439,256.23 24,201,063.59
JUMLAH V 16,743,189.36 32,633,534.63 49,376,723.99

VI. PEKERJAAN ATAP/ PENUTUP ATAP


1 Kuda-kuda Baja Ringan Zincallum 567.50 M2 Ls 150,000.00 0.00 85,125,000.00 85,125,000.00
2 Pek. Papan listplank 2/30 Cm Ky.Borneo 112.25 M' F.48a. 21,550.00 39,466.24 2,418,987.50 4,430,085.44 6,849,072.94
3 Pek. Atap Genteng 624.25 M2 H.2c. 14,860.00 48,600.00 9,276,355.00 30,338,550.00 39,614,905.00
4 Pas. Bubungan 82.00 M' H.5c. 37,780.00 34,758.40 3,097,960.00 2,850,188.80 5,948,148.80
JUMLAH VI 14,793,302.50 122,743,824.24 137,537,126.74

VII. PEKERJAAN PLAFOND


1 Pek. Plafond Eternit 1x1 m, Rangka ky. Borneo 889.25 M2 I.20b. 35,670.00 66,814.00 31,719,547.50 59,414,349.50 91,133,897.00
JUMLAH VII 31,719,547.50 59,414,349.50 91,133,897.00

VIII. PEKERJAAN BESI DAN KACA


1 Pemas. kunci tanam double slaag 8.00 Bh L.2 36,800.00 108,200.00 294,400.00 865,600.00 1,160,000.00
2 Pek. Pemas. engsel pintu 48.00 Bh L.5 12,592.50 10,583.25 604,440.00 507,996.00 1,112,436.00
3 Pek. Pemas. engsel jendela 48.00 Bh L.6 8,395.00 7,055.50 402,960.00 338,664.00 741,624.00
4 Pek. Pemas. grendel pintu 32.00 Bh L.11 8,395.00 7,055.50 268,640.00 225,776.00 494,416.00
5 Pek. Pemas. grendel jendela 32.00 Bh L.11 8,395.00 14,300.00 268,640.00 457,600.00 726,240.00
6 Pek. Pemas. kait jendela 48.00 Bh L.9 12,592.50 10,583.25 604,440.00 507,996.00 1,112,436.00
7 Pas. Kaca polos 5 mm 22.84 M2 L.17 12,597.00 119,790.00 287,715.48 2,736,003.60 3,023,719.08
JUMLAH VIII 2,731,235.48 5,639,635.60 8,370,871.08

IX. PEKERJAAN CAT


1 Pengecatan dinding tembok 2,165.76 M2 N.14 6,239.00 10,491.00 13,512,176.64 22,720,988.16 36,233,164.80
2 Pengecatan kusen, lisplank 41.21 M2 N.8 5,185.00 34,003.00 213,663.48 1,401,195.62 1,614,859.10
3 Pengecatan daun jendela, pintu 105.72 M2 N.8 5,185.00 34,003.00 548,133.31 3,594,633.95 4,142,767.26
JUMLAH IX 14,273,973.43 27,716,817.73 41,990,791.16

X. PEKERJAAN INST. LISTRIK


1 Pek. Pas. Titik lampu komplit 109.00 TTK Ls - 86,000.00 0.00 9,374,000.00 9,374,000.00
2 Pas. Stop kontak 32.00 Bh Ls - 19,800.00 0.00 633,600.00 633,600.00
3 Pas. Saklar 16.00 Bh Ls - 25,800.00 0.00 412,800.00 412,800.00
4 Pas. Lampu 61.00 Bh Ls - 37,400.00 0.00 2,281,400.00 2,281,400.00
JUMLAH X 0.00 12,701,800.00 12,701,800.00
XI. PEKERJAAN SANITASI
1 Pek. Kloset jongkok 8.00 Unit Ls - 3,000,000.00 0.00 24,000,000.00 24,000,000.00
JUMLAH XI 0.00 24,000,000.00 24,000,000.00
JUMLAH LANTAI 2 226,144,374.45 506,504,143.51 756,648,517.96
JUMLAH LANTAI 1 + 2 564,278,802.10 1,396,521,370.79 2,081,984,500.09
C DAPUR
I. PEKERJAAN PERSIAPAN
1 Pek. Pas. Bowplank 22.25 M' A.1a 13,750.00 28,914.00 305,937.50 643,336.50 949,274.00
2 Pek. Steger 42.75 M2 A-15 4,400.00 27,750.00 188,100.00 1,186,312.50 1,374,412.50
3 Pek. Stootwerk 56.55 M2 A.11.c 39,780.00 85,200.00 2,249,559.00 4,818,060.00 7,067,619.00
JUMLAH I 305,937.50 643,336.50 9,391,305.50

II. PEKERJAAN TANAH DAN PASIR


1 Pek. Galian tanah Pondasi 61.20 M3 B.1. 25,600.00 - 1,566,720.00 0.00 1,566,720.00
2 Urg. Kembali bekas galian pondasi 15.30 M3 B.9. 12,270.00 - 187,731.00 0.00 187,731.00
3 Pek. Urg. Tanah alas lantai T .50 cm 21.38 M3 B.10. 32,000.00 - 684,000.00 0.00 684,000.00
4 Pek. Urg. Pasir alas lantai 4.28 M3 B.11. 17,400.00 111,000.00 74,385.00 474,525.00 548,910.00
5 Pek. Urg. Pasir alas pondasi T. 10 cm 5.59 M3 B.11. 17,400.00 111,000.00 97,300.80 620,712.00 718,012.80
JUMLAH II 2,610,136.80 1,095,237.00 3,705,373.80

III. PEKERJAAN PASANGAN


1 Pas Batu kosong ( Aanstamping ) 6.48 M3 C.14. 76,830.00 270,150.00 497,858.40 1,750,572.00 2,248,430.40
2 Pek. Pondasi batu belah 1Pc : 5 Ps ( batu kali ) 9.72 M3 C.6. 136,050.00 509,162.80 1,322,406.00 4,949,062.42 6,271,468.42
3 Pek. Lantai kerja (Beton Tumbuk) 1Pc:3Ps:5Kr 3.87 M3 G.1. 117,450.00 568,786.00 454,002.98 2,198,642.28 2,652,645.26
4 Pas. Bata dinding 1 Pc : 5 Ps 126.14 M2 D.12. 26,750.00 60,274.00 3,374,245.00 7,602,962.36 10,977,207.36
5 Plesteran dinding + Acian 1Pc : 5 Ps 252.28 M2 E.4e. 26,360.00 10,562.80 6,650,100.80 2,664,783.18 9,314,883.98
JUMLAH III 12,298,613.18 19,166,022.24 31,464,635.42

IV. PEKERJAAN BETON K225


1 Pek. Sloof 20/30 2.43 M3 G.4b+G.25a.4+G.29d. 751,435.00 2,942,339.70 1,825,987.05 7,149,885.47 8,975,872.52
2 Pek. Kolom Struktur 30/35 7.53 M3 G.4b+G.25a.11+G.29k. 990,441.75 3,737,044.90 7,460,007.26 28,147,422.21 35,607,429.47
3 Pek. Kolom 12/12 0.09 M3 G.4b+G.25a.5+G.29e. 1,279,939.75 4,648,057.04 117,959.25 428,364.94 546,324.18
4 Pek. Balok Induk 30/60 4.28 M3 G.4b+G.25a.21+G.29u. 931,818.15 3,669,166.11 3,983,522.59 15,685,685.12 19,669,207.71
5 Pek. Balok anak 20/30 19.20 M3 G.4b+G.25a.18+G.29r. 1,048,414.35 3,916,144.66 20,129,555.52 75,189,977.45 95,319,532.97
6 Pek. Plat lantai t.12 cm 5.13 M3 G.4b+G.25a.17+G.29q 803,858.45 3,196,992.91 4,123,793.85 16,400,573.62 20,524,367.47
7 Pek. Pasangan profil kanopi 0.96 M3 G.4a+G.25a.39+G.29z.13 670,398.65 2,484,261.78 643,582.70 2,384,891.30 3,028,474.01
8 Pek. Pondasi Plat 1.2 x 1.2 6.91 M3 G.4b+G.25a.24+G.29x 652,209.00 2,796,110.08 4,508,068.61 19,326,712.87 23,834,781.48
JUMLAH IV 42,792,476.83 164,713,512.99 207,505,989.82
V. PEKERJAAN LANTAI
1 Pas. Lantai keramik putih polos 40x40 42.75 M2 M.5a 44,254.50 55,909.50 1,891,879.88 2,390,131.13 4,282,011.00
JUMLAH V 1,891,879.88 2,390,131.13 4,282,011.00

VI. PEKERJAAN KUSEN KAYU BORNEO


1 Pek. Kusen pintu, jendela 0.68 M3 F.3. 1,777,000.00 5,702,400.00 1,213,868.70 3,895,309.44 5,109,178.14
2 Pek. Daun pintu dan jendela 5.88 M2 F.11a. 203,600.00 254,254.00 1,197,168.00 1,495,013.52 2,692,181.52
JUMLAH VI 2,411,036.70 5,390,322.96 7,801,359.66

VII. PEKERJAAN BESI DAN KACA


1 Pemas. kunci tanam double slaag 1.00 Bh L.2 36,800.00 108,200.00 36,800.00 108,200.00 145,000.00
2 Pek. Pemas. engsel pintu 6.00 Bh L.5 12,592.50 23,100.00 75,555.00 138,600.00 214,155.00
3 Pek. Pemas. engsel jendela 6.00 Bh L.6 8,395.00 17,000.00 50,370.00 102,000.00 152,370.00
4 Pek. Pemas. grendel pintu 4.00 Bh L.11 8,395.00 14,300.00 33,580.00 57,200.00 90,780.00
5 Pek. Pemas. grendel jendela 4.00 Bh L.11 8,395.00 14,300.00 33,580.00 57,200.00 90,780.00
6 Pek. Pemas. kait jendela 6.00 Bh L.9 12,592.50 8,800.00 75,555.00 52,800.00 128,355.00
7 Pas. Kaca polos 5 mm 4.64 M2 L.17 12,597.00 119,790.00 58,470.24 556,017.26 614,487.50
JUMLAH VII 363,910.24 1,072,017.26 1,435,927.50

VIII. PEKERJAAN CAT


1 Pengecatan dinding tembok 252.28 M2 N.14 6,239.00 10,491.00 1,573,974.92 2,646,669.48 4,220,644.40
2 Pengecatan kusen, 7.53 M2 N.8 5,185.00 34,003.00 39,058.61 256,144.60 295,203.20
3 Pengecatan daun jendela, pintu 8.06 M2 N.8 5,185.00 34,003.00 41,799.40 274,118.58 315,917.98
JUMLAH VIII 1,654,832.92 3,176,932.66 4,831,765.58

IX. PEKERJAAN INST. LISTRIK


1 Pek. Pas. Titik lampu komplit 24.00 TTK Ls - 86,000.00 0.00 2,064,000.00 2,064,000.00
2 Pas. Stop kontak 12.00 Bh Ls - 19,800.00 0.00 237,600.00 237,600.00
3 Pas. Saklar 4.00 Bh Ls - 25,800.00 0.00 103,200.00 103,200.00
4 Pas. Lampu 8.00 Bh Ls - 37,400.00 0.00 299,200.00 299,200.00
JUMLAH IX 0.00 2,704,000.00 2,704,000.00
X. PENGEBORAN
1 Pekerjaan Persiapan
2 Mobilisasi dan demolisasi 1.00 Ls Ls 1,000,000.00 - 1,000,000.00 0.00 1,000,000.00
3 Penyediaan air sirkulasi 1.00 Ls Ls 700,000.00 19,800.00 700,000.00 19,800.00 719,800.00

Pekerjaan Pengeboran
1 Pekerjaan Pengeboran 1 Paket 100.00 m Ls 270,000.00 49,600.00 27,000,000.00 4,960,000.00 31,960,000.00
2 Pumping test 1 x 24 jam 1.00 Ls Ls 500,000.00 - 500,000.00 0.00 500,000.00
3 Electrical Logging Test 1.00 Ls Ls 1,500,000.00 - 1,500,000.00 0.00 1,500,000.00

Penyambungan Liatrik
1 Penyambungan Listrik Daya 3500 watt 3,500.00 watt Ls 950.00 - 3,325,000.00 0.00 3,325,000.00

Pengadaan Material dan Pipa Aksesoris


1 Pipa PVC SNI Ø 6" 82.00 m' Ls - 243,000.00 0.00 19,926,000.00 19,926,000.00
2 Pipa PVC SNI 4" 18.00 m' Ls - 115,200.00 0.00 2,073,600.00 2,073,600.00
3 Pipa PVC SNI 1,5" 82.00 m' Ls - 23,500.00 0.00 1,927,000.00 1,927,000.00
4 Semen Grouting 1.00 m3 Ls - 270,000.00 0.00 270,000.00 270,000.00
5 Koral Bersih 1.00 m3 Ls - 300,000.00 0.00 300,000.00 300,000.00
6 Pek. Rabat beton ad 1:3:5 t=10 cm 1.00 m3 Ls 159,500.00 757,853.20 159,500.00 757,853.20 917,353.20
7 Pas. Bata Merah 1Pc : 4Ps 1.00 m2 Ls 68,000.00 129,178.60 68,000.00 129,178.60 197,178.60
8 Gate Valve dia. 1 1/2" 1.00 Bh Ls - 556,600.00 0.00 556,600.00 556,600.00
9 Check Valve 1.00 Bh Ls - 545,000.00 0.00 545,000.00 545,000.00
10 Membuat 1 Unit Tutup Plat Bordes 1.00 Unit Ls - 385,000.00 0.00 385,000.00 385,000.00
11 Dop 4" 1.00 bh Ls - 50,000.00 0.00 50,000.00 50,000.00

Pengadaan Pompa
1 Pompa Submersible 2 PK 1.00 set Ls - 18,000,000.00 0.00 18,000,000.00 18,000,000.00
2 Panel box 1.00 bh Ls - 4,000,000.00 0.00 4,000,000.00 4,000,000.00
3 Pengkabelan NYYHY 3x2,5 mm dan NYYHY 3X0,75 MM+ 100.00 m Ls - 20,000.00 0.00 2,000,000.00 2,000,000.00
4 Kabel elektroda 100.00 m Ls - 20,000.00 0.00 2,000,000.00 2,000,000.00
5 Elektroda 10.00 bh Ls - 100,000.00 0.00 1,000,000.00 1,000,000.00
6 Stabilizer 1.00 Unit Ls - 4,500,000.00 0.00 4,500,000.00 4,500,000.00
JUMLAH IX 34,252,500.00 63,400,031.80 97,652,531.80
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN ASRAMA PUTRA MA'ARIF LANGUT
JUMLAH TOTAL
JUMLAH
NO URAIAN PEKERJAAN
UPAH BAHAN
1 2 3 4 5

A LANTAI 1
I. PEKERJAAN PERSIAPAN 1,567,400.00 6,961,972.30 41,713,699.50
II. PEKERJAAN TANAH DAN PASIR 25,263,376.22 7,092,900.00 32,356,276.22
III. PEKERJAAN PASANGAN 93,499,441.50 146,153,625.04 239,653,066.54
IV. PEKERJAAN BETON K225 157,503,555.11 617,920,776.03 775,424,331.14
V. PEKERJAAN LANTAI 28,278,625.50 35,726,170.50 64,004,796.00
VI. PEKERJAAN KUSEN KAYU BORNEO 16,743,189.36 32,633,534.63 49,376,723.99
VII. PEKERJAAN BESI DAN KACA 2,731,235.48 6,864,003.60 9,595,239.08
VIII. PEKERJAAN CAT 12,547,604.48 23,962,445.18 36,510,049.66
IX. PEKERJAAN INST. LISTRIK 0.00 12,701,800.00 12,701,800.00
X. PEKERJAAN SANITASI 0.00 44,000,000.00 44,000,000.00
XI. PEKERJAAN TANGGA 0.00 20,000,000.00 20,000,000.00
JUMLAH LANTAI 1 338,134,427.65 954,017,227.28 1,325,335,982.13

B LANTAI 2
I. PEKERJAAN TANAH DAN PASIR 1,111,860.00 7,092,900.00 8,204,760.00
II. PEKERJAAN PASANGAN 89,809,001.10 106,318,711.55 196,127,712.65
III. PEKERJAAN BETON K 175 26,683,639.58 96,516,399.76 123,200,039.34
IV. PEKERJAAN LANTAI 28,278,625.50 35,726,170.50 64,004,796.00
V. PEKERJAAN KUSEN KAYU BORNEO 16,743,189.36 32,633,534.63 49,376,723.99
VI. PEKERJAAN ATAP/ PENUTUP ATAP 14,793,302.50 122,743,824.24 137,537,126.74
VII. PEKERJAAN PLAFOND 31,719,547.50 59,414,349.50 91,133,897.00
VIII. PEKERJAAN BESI DAN KACA 2,731,235.48 5,639,635.60 8,370,871.08
IX. PEKERJAAN CAT 14,273,973.43 27,716,817.73 41,990,791.16
X. PEKERJAAN INST. LISTRIK 0.00 12,701,800.00 12,701,800.00
XI. PEKERJAAN SANITASI 0.00 24,000,000.00 24,000,000.00
JUMLAH LANTAI 2 226,144,374.45 530,504,143.51 756,648,517.96
JUMLAH TOTAL
JUMLAH
NO URAIAN PEKERJAAN
UPAH BAHAN
1 2 3 4 5
C DAPUR
I. PEKERJAAN PERSIAPAN 305,937.50 643,336.50 9,391,305.50
II. PEKERJAAN TANAH DAN PASIR 2,610,136.80 1,095,237.00 3,705,373.80
III. PEKERJAAN PASANGAN 12,298,613.18 19,166,022.24 31,464,635.42
IV. PEKERJAAN BETON K225 42,792,476.83 164,713,512.99 207,505,989.82
V. PEKERJAAN LANTAI 1,891,879.88 2,390,131.13 4,282,011.00
VI. PEKERJAAN KUSEN KAYU BORNEO 2,411,036.70 5,390,322.96 7,801,359.66
VII. PEKERJAAN BESI DAN KACA 363,910.24 1,072,017.26 1,435,927.50
VIII. PEKERJAAN CAT 1,654,832.92 3,176,932.66 4,831,765.58
IX. PEKERJAAN INST. LISTRIK 0.00 2,704,000.00 2,704,000.00
X. PENGEBORAN 34,252,500.00 63,400,031.80 97,652,531.80
JUMLAH DAPUR 98,581,324.04 263,751,544.54 370,774,900.08
JUMLAH TOTAL………………………………… 662,860,126.14 1,748,272,915.33 2,452,759,400.17
DIBULATKAN……………………………………………………………………………………………. 2,452,759,000.00
TERBILANG :
DUA MILYAR EMPAT RATUS DUA PULUH LIMA JUTA TUJUH RATUS SEMBILAN PULUH DELAPAN RIBU RUPIAH

DISETUJUI, DIBUAT OLEH,


PIMPINAN PESANTREN HIDAYATUL MA'ARIF

K. QOSIM, S.Pd.I KOMARUDIN, MT.

MENGETAHUI,
KETUA YAYASAN HIDAYATUL MA'ARIF

DRS. IMRON ROSYADI, M.Pd


Pekerjaan Persiapan
Mobilisasi dan demolisasi
Penyediaan air sirkulasi
Test Geolistrik

Pekerjaan Pengeboran
Pekerjaan Pengeboran 1 Paket
Pumping test 1 x 24 jam
Electrical Logging Test

Penyambungan Liatrik
Penyambungan Listrik Daya 3500 watt
Token Awal
Administrasi
Gambar Proteksi
Pengurusan

Pengadaan Material dan Pipa Aksesoris


Pipa PVC SNI Ø 6"
Pipa PVC SNI 4"
Pipa PVC SNI 1,5"
Semen Grouting
Koral Bersih
Pek. Rabat beton ad 1:3:5 t=10 cm
Pas. Bata Merah 1Pc : 4Ps
Gate Valve dia. 1 1/2"
Check Valve
Membuat 1 Unit Tutup Plat Bordes
Dop 4"

Pengadaan Pompa
Pompa Submersible 2 PK
Panel box
Pengkabelan NYYHY 3x2,5 mm dan NYYHY 3X0,75 MM+
Kabel elektroda
Elektroda
Stabilizer
tambahan
39 10 390
4 3 12

Luas 390 m2
39 3 117
10 6 60

keliling 177 m'

GALIAN TANAH PONDASI


tinggi 0.9
lebar 0.8 0.72 127.44 m3 type 1

tambahan penggalian akibat plat


panjang 1.4
lebar 1.4 109.76
tinggi 2 3.92
jumlah 28 109.76 m3 pelat 1

panjang 1
lebar 1 21
tinggi 1.5 1.5
jumlah 14 21 m3 pelat 2
jumlah galian 258.2 m3

URUG KEMBALI BEKAS GALIAN 64.55 m3

PASIR ALAS PONDASI


tinggi 0.1
lebar 0.8 0.08 14.16 m3 type 1

tambahan akibat plat


panjang 1.4
lebar 1.4
tinggi 0.1 0.196
jumlah 28 5.488 m3 pelat 1

panjang 1
lebar 1
tinggi 0.1 0.1
jumlah 14 1.4 m3 pelat 2
jumlah pasir alas pondasi 21.048 m3
PASIR ALAS LANTAI
tinggi 0.05 19.5 m3
lantai atas

URUG TANAH PENINGGIAN DLM BANGUNAN t. 25 cm


tinggi 0.25 97.5 m3

LANTAI KERJA t. 5 cm
tinggi 0.05 19.5 m3

tambahan akibat plat


panjang 1.4
lebar 1.4
tinggi 0.1 0.196
jumlah 28 5.488 m3 pelat 1

panjang 1
lebar 1
tinggi 0.1 0.1
jumlah 14 1.4 m3 pelat 2
jumlah lantai kerja pondasi 26.388 m3

AANSTAMPING
tinggi 0.2
lebar 0.8 0.16 28.32 m3 type 1

PONDASI BATU KALI


0.3 0.6 JUMLAH GARIS SEJAJAR
0.45
lebar 0.45
tinggi 0.6 0.27 47.79 m3 type 1

CRUCUK BAMBU AMPEL

PASANGAN BATA DINDING

PLESTERAN + ACIAN

SLOOF 20/30
lebar 0.2
tinggi 0.3 0.06 10.62 m3

KOLOM STRUKTUR 30/35 K,225


panjang 0.35
lebar 0.3
tinggi 3.45 0.36225
jumlah 28 4.41 14.553 m3

KOLOM TERAS 25/25 K, 225


panjang 0.25
lebar 0.25
tinggi 3.45 0.215625
jumlah 14 1.3125 4.33125 m3
0.09375

KOLOM PRAKTIS 15/15


panjang 0.15
lebar 0.15
tinggi 3.45 0.077625
jumlah 6 0.46575 m3

BALOK INDUK 30/60 K, 225


panjang 8
lebar 0.3
tinggi 0.6 1.44
jumlah 14 20.16 m3

BALOK ANAK 20/30 K, 225


panjang 39.00
lebar 0.2
tinggi 0.3 2.34
jumlah 4 9.36 m3

BALOK TERAS 20/25 K, 225


panjang 2
lebar 0.2
tinggi 0.25 0.1
jumlah 14 1.4 m3

PLAT DAK BETON


panjang 39
lebar 10
tinggi 0.12 46.8 m3

PONDASI PLAT BETON 120 X 120


BAWAH
panjang 1.4
lebar 1.4
tinggi 0.3 0.588
KOLOM
panjang 0.35
lebar 0.3
tinggi 1.5 0.1575 0.7455
JUMLAH 28 20.874 m3

PONDASI PLAT BETON 100 X 100


BAWAH
panjang 1.0
lebar 1.0
tinggi 0.3 0.3
KOLOM
panjang 0.25
lebar 0.25
tinggi 1.5 0.09375 0.39375
JUMLAH 14 5.5125 m3

BALOK Kanopi 20/25 K, 225


panjang 39
lebar 0.25
tinggi 0.15 1.4625
jumlah 2 6.4818 m3

PLAT KANOPI 0.6


0.08
2.85 3.5568
13
2

JENDELA
j1
panjang 1.99
lebar 1.02 2.0298
jumlah 21 42.6258 42.6258

Daun Jendela
0.9 0.62 0.558
0.78 0.48 0.3744
0.1836
2 0.3672 7.7112
21 7.7112 m2
j2
panjang 0
lebar 0 0
jumlah 0 0 0

42.6258 42.6258

PINTU
panjang 2.16
lebar 1.32 2.8512 8.5536
jumlah 3 8.5536 m2

Daun Pintu
2.1
1.22 7.686
3 7.686 m2

15.3972

DINDING
bawah
depan+belakang 39 3.45 2 269.1
samping 8 3.15 6 151.2
0.5 2.45 13 15.925
436.225

pengurangan
jendela + BV 42.6258
pintu 8.5536
51.1794

jumlah dinding 385.0456 m2

PLESTERAN 0 m2

KERAMIK 390 m2

pengecatan kusen
0.27 8.06 21 169.26
6.24 3 18.72
187.98 50.7546
50.7546 m2
pengecatan daun jendel dan pintu

jendela 7.7112 2 15.4224


pintu 7.686 2 15.372
30.7944 m2

kaca
JV 1 0.48 0.78 2 0.7488
0.92 0.57 1 0.5244
1.2732

21 26.7372 m2
Roster 21 3 63
54 m2

lantai 2
balok latei
panjang 49
lebar 0.12
tinggi 0.12
0.7056 m3

SANWERING 10/30
panjang 0
lebar 0.1
tinggi 0.3
0 m3
dinding
28 4 4 448
14.25 4 8 456
24 4 1 96
904

0.95 28 26.6
27 0.2 0.6 3.24
23.36
7.2
3.2
4
7.5 2.7 2 40.5

835.6806

KOLOM STRUKTUR 25/25 K,225


panjang 0.25
lebar 0.25
tinggi 4 0.25
jumlah 28 7

KOLOM TERAS 25/25 K, 225


panjang 0.25
lebar 0.25
tinggi 4 0.25
jumlah 14 3.5
KOLOM PRAKTIS 15/15
panjang 0.12
lebar 0.12
tinggi 4 0.0576
jumlah 6 0.3456

ring balok 20/30 K, 225


panjang 177.00
lebar 0.15
tinggi 0.2
5.31

lisplank
41 2 82
12 2 24
106
0.3 31.8

bubungan
29 1 29
7.1 4 28.4
57.4 m'

plafond 41 12
492 m2

kuda-kuda 41 29 35
6.89 241.15
482.3

12 7.1 42.6
85.2
567.5 m2

624.25
bouplank
82
24
Σ 106

62.4
780

1.5
0.2
0.2
0.5
2.4
39
8.6625

0.46575

112
0.3
33.6

156
0.2 perhitungan sengkang
31.2
kolom 30x35 0.3 x 0.35
tinggi 3.5 panjang besi sengkang 1.24
jumlah besi 12 tinggi 3.45
kolom 28 jarak antar sengkang 0.2
bj diameter 16 1.58 17.25
18
dibulatkan
jumlah berat besi struktur 1858.08
jumlah berat besi sengkang 243.734
jumlah total besi 2101.81

28
0.2
5.6
BEKISTING 70.4
4.485 125.58

21 33.18
929.04

0.26 0.31
1.24

3.45 23
24 29.76
11.6064 324.9792

1254.0192 KG
1858.08 125.58

17.25
243.7344
2101.8144

670,398.65 2,484,261.78 4,345,389.97 16,102,488.0 20,447,877.943

jumlah

2 3.98
4 4.08
8.06 m'
ukuran kayu
0.06 0.15 0.07254 m3 1.5233 m3
3.047

3 0
4 0
0 m'
ukuran kayu
0.06 0.15 0 m3 0 m3

2 4.32
1 1.32
ukuran kayu 6.24
0.06 0.15 0.05616 m3 0.1685 0.337
1.6918 m3

panjang kayu total


m3
m3
tambahan
44 14.25 627
4 3 12

Luas 639 m2
44 4 176
14.25 8 114
4 3 12
302 m'
keliling

GALIAN TANAH PONDASI


tinggi 0.8
lebar 0.8 0.64 193.28 m3 type 1

tambahan penggalian akibat plat


panjang 1.4
lebar 1.4 135.24
tinggi 1.5 2.94
jumlah 46 135.24 m3 pelat 1

panjang 1.2
lebar 1.2 0
tinggi 1.5 2.16
jumlah 0 0 m3 pelat 2
jumlah galian 328.52 m3

URUG KEMBALI BEKAS GALIAN 82.13 m3

PASIR ALAS PONDASI


tinggi 0.1
lebar 0.8 0.08 24.16 m3 type 1

tambahan akibat plat


panjang 1.4
lebar 1.4
tinggi 0.1 0.196
jumlah 46 9.016 m3 pelat 1

panjang 1.2
lebar 1.2
tinggi 0.1 0.144
jumlah 0 0 m3 pelat 2
jumlah pasir alas pondasi 33.176 m3
PASIR ALAS LANTAI
tinggi 0.1 63.9 m3
lantai atas

URUG TANAH PENINGGIAN DLM BANGUNAN t. 40 cm


tinggi 0.5 319.5 m3

LANTAI KERJA t. 5 cm
tinggi 0.05 31.95 m3

tambahan akibat plat


panjang 1.2
lebar 1.2
tinggi 0.1 0.144
jumlah 46 6.624 m3 pelat 1

panjang 1
lebar 1
tinggi 0.1 0.1
jumlah 0 0 m3 pelat 2
jumlah lantai kerja pondasi 38.574 m3

AANSTAMPING
tinggi 0.2
lebar 0.8 0.16 48.32 m3 type 1

PONDASI BATU KALI


0.5 0.3 JUMLAH GARIS SEJAJAR
0.4
lebar 0.4
tinggi 0.6 0.24 72.48 m3 type 1

CRUCUK BAMBU AMPEL

PASANGAN BATA DINDING

PLESTERAN + ACIAN

SLOOF 20/30
lebar 0.2
tinggi 0.3 0.06 18.12 m3

KOLOM STRUKTUR 30/35 K,225


panjang 0.35
lebar 0.3
tinggi 3.2 0.336
jumlah 46 6.1985 21.6545 m3

KOLOM TERAS 25/25 K, 225


panjang 0.25
lebar 0.25
tinggi 3.2 0.2
jumlah 0 0 0 m3
0.06875

KOLOM PRAKTIS 15/15


panjang 0.12
lebar 0.12
tinggi 3.2 0.04608
jumlah 30 1.3824 m3

BALOK INDUK 30/60 K, 225


panjang 14.25
lebar 0.3
tinggi 0.5 2.1375
jumlah 12 25.65 m3

BALOK ANAK 20/30 K, 225


panjang 56.00
lebar 0.2
tinggi 0.4 4.48
jumlah 4 17.92 m3

BALOK TERAS 20/25 K, 225


panjang 1.8
lebar 0.2
tinggi 0.25 0.09
jumlah 14 1.26 m3

PLAT DAK BETON


panjang 44
lebar 14.25
tinggi 0.12 75.24 m3

PONDASI PLAT BETON 120 X 120


BAWAH
panjang 1.2
lebar 1.2
tinggi 0.3 0.432
KOLOM
panjang 0.35
lebar 0.35
tinggi 1.1 0.13475 0.56675
JUMLAH 46 19.872 m3

PONDASI PLAT BETON 100 X 100


BAWAH
panjang 1.0
lebar 1.0
tinggi 0.3 0.3
KOLOM
panjang 0.25
lebar 0.25
tinggi 1.1 0.06875 0.36875
JUMLAH 0 0 m3

BALOK Kanopi 20/25 K, 225


panjang 4
lebar 0.08
tinggi 0.75 0.24
jumlah 20 4.8 m3

80
36

JENDELA
j1
panjang 2.35
lebar 1.4 3.29
jumlah 16 52.64 105.28

Daun Jendela
0.57 0.82 0.4674
0.42 0.68 0.2856
0.1818
2 0.3636 11.6352
16 5.8176 m2
j2
panjang 2.35
lebar 0.5 1.175
jumlah 8 9.4 18.8

62.04 124.08

PINTU
panjang 2.1
lebar 1.4 2.94 94.08
jumlah 16 47.04 m2

Daun Pintu
2.1
1.4 94.08
16 47.04 m2

52.8576

DINDING
bawah
depan+belakang 44 3.4 4 598.4
samping 14.25 3.4 8 387.6
24 3.4 1 81.6
1067.6

pengurangan
jendela + BV 62.04
pintu 47.04
109.08

jumlah dinding 958.52 m2

PLESTERAN 1917.04 m2

KERAMIK 639 m2

pengecatan kusen
0.27 21.7
6.2
27.9 7.533
7.533 m2
pengecatan daun jendel dan pintu

daun jedela 5.8176 2 11.6352


daun pintu 47.04 2 94.08
105.7152 m2

kaca
JV 1 0.4
0.7 0.28
2 0.56

16 22.84 m2

0.62
0.82 0.5084
1 0.5084

16
0.57
0.42 0.2394
3 0.7182

8
Roster
54 m2

lantai 2
balok latei
panjang 58.25
lebar 0.12
tinggi 0.12
0.8388 m3

SANWERING 10/30
panjang 0
lebar 0.1
tinggi 0.3
0 m3
dinding
46 4 4 736
14.25 4 8 456
24 4 1 96
1192

0.95 46 43.7
27 0.2 0.6 3.24
40.46
7.2
3.2
4
7.5 2.7 2 40.5

1082.88

KOLOM STRUKTUR 25/25 K,225


panjang 0.25
lebar 0.25
tinggi 4 0.25
jumlah 46 11.5

KOLOM TERAS 25/25 K, 225


panjang 0.25
lebar 0.25
tinggi 4 0.25
jumlah 0 0
KOLOM PRAKTIS 15/15
panjang 0.12
lebar 0.12
tinggi 4 0.0576
jumlah 30 1.728

ring balok 20/30 K, 225


panjang 302.00
lebar 0.15
tinggi 0.2
9.06

lisplank
48 2 96
16.25 1 16.25
112.25
0.3 33.675

bubungan
42 1 42
2.7 4 10.8
7.2 4 28.8

81.6
plafond 48
16.25 889.25
11.5
9.5

kuda-kuda
26 32 230.4
38
7.2 460.8

16.25
7.2 117 599.7375

3.55 3.55 9.585


3.55
2.7 38.34

2.7
16.25 21.9375

8.26 14.42
20.58
7.38
212.8392
12.78 7.13 91.1214
303.9606
88
16.25
6
5

115.25

1278

1.5
0.2
0.2
0.5
2.4
127.8
0

1.3824

171
0.3
51.3

224
0.2
44.8

25.2
0.2
5.04
101.14
670,398.65 2,484,261.78 3,217,913.52 ### ###

jumlah

3 7.05
4 5.6
12.65 m'
ukuran kayu
0.06 0.15 0.11385 m3 1.8216 m3

3 7.05
4 2
9.05 m'
ukuran kayu
0.06 0.15 0.08145 m3 0.6516 m3

2 4.2
1 1.4
ukuran kayu 6.2
0.06 0.15 0.0558 m3 0.8928
3.366 m3

panjang kayu total


3.6432 m3
1.7856 m3
tambahan
3 14.25 42.75

Luas 42.75 m2
3 4 12
14.25 2 28.5

40.5 m'
keliling

GALIAN TANAH PONDASI


tinggi 0.8
lebar 0.8 0.64 25.92 m3 type 1

tambahan penggalian akibat plat


panjang 1.4
lebar 1.4 35.28
tinggi 1.5 2.94
jumlah 12 35.28 m3 pelat 1

panjang 1.2
lebar 1.2 0
tinggi 1.5 2.16
jumlah 0 0 m3 pelat 2
jumlah galian 61.2 m3

URUG KEMBALI BEKAS GALIAN 15.3 m3

PASIR ALAS PONDASI


tinggi 0.1
lebar 0.8 0.08 3.24 m3 type 1

tambahan akibat plat


panjang 1.4
lebar 1.4
tinggi 0.1 0.196
jumlah 12 2.352 m3 pelat 1

panjang 1.2
lebar 1.2
tinggi 0.1 0.144
jumlah 0 0 m3 pelat 2
jumlah pasir alas pondasi 5.592 m3
PASIR ALAS LANTAI
tinggi 0.1 4.275 m3
lantai atas

URUG TANAH PENINGGIAN DLM BANGUNAN t. 40 cm


tinggi 0.5 21.375 m3

LANTAI KERJA t. 5 cm
tinggi 0.05 2.1375 m3

tambahan akibat plat


panjang 1.2
lebar 1.2
tinggi 0.1 0.144
jumlah 12 1.728 m3 pelat 1

panjang 1
lebar 1
tinggi 0.1 0.1
jumlah 0 0 m3 pelat 2
jumlah lantai kerja pondasi 3.8655 m3

AANSTAMPING
tinggi 0.2
lebar 0.8 0.16 6.48 m3 type 1

PONDASI BATU KALI


0.5 0.3 JUMLAH GARIS SEJAJAR
0.4
lebar 0.4
tinggi 0.6 0.24 9.72 m3 type 1

CRUCUK BAMBU AMPEL

PASANGAN BATA DINDING

PLESTERAN + ACIAN

SLOOF 20/30
lebar 0.2
tinggi 0.3 0.06 2.43 m3

KOLOM STRUKTUR 30/35 K,225


panjang 0.35
lebar 0.3
tinggi 3.2 0.336
jumlah 16 2.156 7.532 m3

KOLOM TERAS 25/25 K, 225


panjang 0.25
lebar 0.25
tinggi 3.2 0.2
jumlah 0 0 0 m3
0.06875

KOLOM PRAKTIS 15/15


panjang 0.12
lebar 0.12
tinggi 3.2 0.04608
jumlah 2 0.09216 m3

BALOK INDUK 30/60 K, 225


panjang 14.25
lebar 0.3
tinggi 0.5 2.1375
jumlah 2 4.275 m3

BALOK ANAK 20/30 K, 225


panjang 15.00
lebar 0.2
tinggi 0.4 1.2
jumlah 16 19.2 m3

BALOK TERAS 20/25 K, 225


panjang 1.8
lebar 0.2
tinggi 0.25 0.09
jumlah 0 0 m3

PLAT DAK BETON


panjang 3
lebar 14.25
tinggi 0.12 5.13 m3

PONDASI PLAT BETON 120 X 120


BAWAH
panjang 1.2
lebar 1.2
tinggi 0.3 0.432
KOLOM
panjang 0.35
lebar 0.35
tinggi 1.1 0.13475 0.56675
JUMLAH 16 6.912 m3

PONDASI PLAT BETON 100 X 100


BAWAH
panjang 1.0
lebar 1.0
tinggi 0.3 0.3
KOLOM
panjang 0.25
lebar 0.25
tinggi 1.1 0.06875 0.36875
JUMLAH 0 0 m3

BALOK Kanopi 20/25 K, 225


panjang 4
lebar 0.08
tinggi 0.75 0.24
jumlah 4 0.96 m3

16
36

JENDELA
j1
panjang 2.35
lebar 1.4 3.29
jumlah 3 9.87 19.74

Daun Jendela
0.57 0.82 0.4674
0.42 0.68 0.2856
0.1818
2 0.3636 2.1816
3 1.0908 m2
j2
panjang 2.35
lebar 0.5 1.175
jumlah 2 2.35 4.7

12.22 24.44

PINTU
panjang 2.1
lebar 1.4 2.94 5.88
jumlah 1 2.94 m2

Daun Pintu
2.1
1.4 5.88
1 2.94 m2

4.0308

DINDING
bawah
depan+belakang 3 3.4 2 20.4
samping 14.25 3.4 2 96.9
12 2 1 24
141.3

pengurangan
jendela + BV 12.22
pintu 2.94
15.16

jumlah dinding 126.14 m2

PLESTERAN 252.28 m2

KERAMIK 42.75 m2

pengecatan kusen
0.27 21.7
6.2
27.9 7.533
7.533 m2
pengecatan daun jendel dan pintu

daun jedela 1.0908 2 2.1816


daun pintu 2.94 2 5.88
8.0616 m2

kaca
JV 1 0.4
0.7 0.28
2 0.56

3 4.6416 m2

0.62
0.82 0.5084
1 0.5084

3
0.57
0.42 0.2394
3 0.7182

2
Roster
54 m2

lantai 2
balok latei
panjang 17.25
lebar 0.12
tinggi 0.12
0.2484 m3

SANWERING 10/30
panjang 0
lebar 0.1
tinggi 0.3
0 m3
dinding
12 4 4 192
14.25 4 8 456
24 4 1 96
648

0.95 12 11.4
27 0.2 0.6 3.24
8.16
7.2
3.2
4
7.5 2.7 2 40.5

600.5

KOLOM STRUKTUR 25/25 K,225


panjang 0.25
lebar 0.25
tinggi 4 0.25
jumlah 16 4

KOLOM TERAS 25/25 K, 225


panjang 0.25
lebar 0.25
tinggi 4 0.25
jumlah 0 0
KOLOM PRAKTIS 15/15
panjang 0.12
lebar 0.12
tinggi 4 0.0576
jumlah 2 0.1152

ring balok 20/30 K, 225


panjang 40.50
lebar 0.15
tinggi 0.2
1.215

lisplank
14 2 28
16.25 1 16.25
44.25
0.3 13.275

bubungan
42 1 42
2.7 4 10.8
7.2 4 28.8

81.6
plafond 14
16.25 336.75
11.5
9.5

kuda-kuda
26 32 230.4
38
7.2 460.8

16.25
7.2 117 599.7375

3.55 3.55 9.585


3.55
2.7 38.34

2.7
16.25 21.9375

8.26 14.42
20.58
7.38
212.8392
12.78 7.13 91.1214
303.9606
6
16.25

22.25

1.5
0.2
0.2
0.5
2.4
8.55
0

0.09216

28.5
0.3
8.55

240
0.2
48

0
0.2
0
56.55
670,398.65 2,484,261.78 643,582.70 2,384,891.30 3,028,474.01

jumlah

3 7.05
4 5.6
12.65 m'
ukuran kayu
0.06 0.15 0.11385 m3 0.34155 m3

3 7.05
4 2
9.05 m'
ukuran kayu
0.06 0.15 0.08145 m3 0.1629 m3

2 4.2
1 1.4
ukuran kayu 6.2
0.06 0.15 0.0558 m3 0.0558
0.56025 m3

panjang kayu total


0.6831 m3
0.1116 m3