A LANTAI 1
I. PEKERJAAN PERSIAPAN
1 Biaya Administrasi dan Akomodasi 1.00 Ls Ls - 3,000,000.00 0.00 3,000,000.00 3,000,000.00
2 Pek. Pas. Bowplank 115.25 M' A.1a 13,600.00 34,377.20 1,567,400.00 3,961,972.30 5,529,372.30
3 Pek. Steger 639.00 M2 A-15 4,400.00 27,750.00 2,811,600.00 17,732,250.00 20,543,850.00
4 Pek. Stootwerk 101.14 M2 A.11.c 39,780.00 85,200.00 4,023,349.20 8,617,128.00 12,640,477.20
JUMLAH I 1,567,400.00 6,961,972.30 41,713,699.50
V. PEKERJAAN LANTAI
1 Pas. Lantai keramik putih polos 40x40 639.00 M2 M.5a 44,254.50 55,909.50 28,278,625.50 35,726,170.50 64,004,796.00
JUMLAH V 28,278,625.50 35,726,170.50 64,004,796.00
B LANTAI 2
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Urg. Pasir alas lantai 63.90 M3 B.11. 17,400.00 111,000.00 1,111,860.00 7,092,900.00 8,204,760.00
JUMLAH I 1,111,860.00 7,092,900.00 8,204,760.00
Pekerjaan Pengeboran
1 Pekerjaan Pengeboran 1 Paket 100.00 m Ls 270,000.00 49,600.00 27,000,000.00 4,960,000.00 31,960,000.00
2 Pumping test 1 x 24 jam 1.00 Ls Ls 500,000.00 - 500,000.00 0.00 500,000.00
3 Electrical Logging Test 1.00 Ls Ls 1,500,000.00 - 1,500,000.00 0.00 1,500,000.00
Penyambungan Liatrik
1 Penyambungan Listrik Daya 3500 watt 3,500.00 watt Ls 950.00 - 3,325,000.00 0.00 3,325,000.00
Pengadaan Pompa
1 Pompa Submersible 2 PK 1.00 set Ls - 18,000,000.00 0.00 18,000,000.00 18,000,000.00
2 Panel box 1.00 bh Ls - 4,000,000.00 0.00 4,000,000.00 4,000,000.00
3 Pengkabelan NYYHY 3x2,5 mm dan NYYHY 3X0,75 MM+ 100.00 m Ls - 20,000.00 0.00 2,000,000.00 2,000,000.00
4 Kabel elektroda 100.00 m Ls - 20,000.00 0.00 2,000,000.00 2,000,000.00
5 Elektroda 10.00 bh Ls - 100,000.00 0.00 1,000,000.00 1,000,000.00
6 Stabilizer 1.00 Unit Ls - 4,500,000.00 0.00 4,500,000.00 4,500,000.00
JUMLAH IX 34,252,500.00 63,400,031.80 97,652,531.80
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN ASRAMA PUTRA MA'ARIF LANGUT
JUMLAH TOTAL
JUMLAH
NO URAIAN PEKERJAAN
UPAH BAHAN
1 2 3 4 5
A LANTAI 1
I. PEKERJAAN PERSIAPAN 1,567,400.00 6,961,972.30 41,713,699.50
II. PEKERJAAN TANAH DAN PASIR 25,263,376.22 7,092,900.00 32,356,276.22
III. PEKERJAAN PASANGAN 93,499,441.50 146,153,625.04 239,653,066.54
IV. PEKERJAAN BETON K225 157,503,555.11 617,920,776.03 775,424,331.14
V. PEKERJAAN LANTAI 28,278,625.50 35,726,170.50 64,004,796.00
VI. PEKERJAAN KUSEN KAYU BORNEO 16,743,189.36 32,633,534.63 49,376,723.99
VII. PEKERJAAN BESI DAN KACA 2,731,235.48 6,864,003.60 9,595,239.08
VIII. PEKERJAAN CAT 12,547,604.48 23,962,445.18 36,510,049.66
IX. PEKERJAAN INST. LISTRIK 0.00 12,701,800.00 12,701,800.00
X. PEKERJAAN SANITASI 0.00 44,000,000.00 44,000,000.00
XI. PEKERJAAN TANGGA 0.00 20,000,000.00 20,000,000.00
JUMLAH LANTAI 1 338,134,427.65 954,017,227.28 1,325,335,982.13
B LANTAI 2
I. PEKERJAAN TANAH DAN PASIR 1,111,860.00 7,092,900.00 8,204,760.00
II. PEKERJAAN PASANGAN 89,809,001.10 106,318,711.55 196,127,712.65
III. PEKERJAAN BETON K 175 26,683,639.58 96,516,399.76 123,200,039.34
IV. PEKERJAAN LANTAI 28,278,625.50 35,726,170.50 64,004,796.00
V. PEKERJAAN KUSEN KAYU BORNEO 16,743,189.36 32,633,534.63 49,376,723.99
VI. PEKERJAAN ATAP/ PENUTUP ATAP 14,793,302.50 122,743,824.24 137,537,126.74
VII. PEKERJAAN PLAFOND 31,719,547.50 59,414,349.50 91,133,897.00
VIII. PEKERJAAN BESI DAN KACA 2,731,235.48 5,639,635.60 8,370,871.08
IX. PEKERJAAN CAT 14,273,973.43 27,716,817.73 41,990,791.16
X. PEKERJAAN INST. LISTRIK 0.00 12,701,800.00 12,701,800.00
XI. PEKERJAAN SANITASI 0.00 24,000,000.00 24,000,000.00
JUMLAH LANTAI 2 226,144,374.45 530,504,143.51 756,648,517.96
JUMLAH TOTAL
JUMLAH
NO URAIAN PEKERJAAN
UPAH BAHAN
1 2 3 4 5
C DAPUR
I. PEKERJAAN PERSIAPAN 305,937.50 643,336.50 9,391,305.50
II. PEKERJAAN TANAH DAN PASIR 2,610,136.80 1,095,237.00 3,705,373.80
III. PEKERJAAN PASANGAN 12,298,613.18 19,166,022.24 31,464,635.42
IV. PEKERJAAN BETON K225 42,792,476.83 164,713,512.99 207,505,989.82
V. PEKERJAAN LANTAI 1,891,879.88 2,390,131.13 4,282,011.00
VI. PEKERJAAN KUSEN KAYU BORNEO 2,411,036.70 5,390,322.96 7,801,359.66
VII. PEKERJAAN BESI DAN KACA 363,910.24 1,072,017.26 1,435,927.50
VIII. PEKERJAAN CAT 1,654,832.92 3,176,932.66 4,831,765.58
IX. PEKERJAAN INST. LISTRIK 0.00 2,704,000.00 2,704,000.00
X. PENGEBORAN 34,252,500.00 63,400,031.80 97,652,531.80
JUMLAH DAPUR 98,581,324.04 263,751,544.54 370,774,900.08
JUMLAH TOTAL………………………………… 662,860,126.14 1,748,272,915.33 2,452,759,400.17
DIBULATKAN……………………………………………………………………………………………. 2,452,759,000.00
TERBILANG :
DUA MILYAR EMPAT RATUS DUA PULUH LIMA JUTA TUJUH RATUS SEMBILAN PULUH DELAPAN RIBU RUPIAH
MENGETAHUI,
KETUA YAYASAN HIDAYATUL MA'ARIF
Pekerjaan Pengeboran
Pekerjaan Pengeboran 1 Paket
Pumping test 1 x 24 jam
Electrical Logging Test
Penyambungan Liatrik
Penyambungan Listrik Daya 3500 watt
Token Awal
Administrasi
Gambar Proteksi
Pengurusan
Pengadaan Pompa
Pompa Submersible 2 PK
Panel box
Pengkabelan NYYHY 3x2,5 mm dan NYYHY 3X0,75 MM+
Kabel elektroda
Elektroda
Stabilizer
tambahan
39 10 390
4 3 12
Luas 390 m2
39 3 117
10 6 60
panjang 1
lebar 1 21
tinggi 1.5 1.5
jumlah 14 21 m3 pelat 2
jumlah galian 258.2 m3
panjang 1
lebar 1
tinggi 0.1 0.1
jumlah 14 1.4 m3 pelat 2
jumlah pasir alas pondasi 21.048 m3
PASIR ALAS LANTAI
tinggi 0.05 19.5 m3
lantai atas
LANTAI KERJA t. 5 cm
tinggi 0.05 19.5 m3
panjang 1
lebar 1
tinggi 0.1 0.1
jumlah 14 1.4 m3 pelat 2
jumlah lantai kerja pondasi 26.388 m3
AANSTAMPING
tinggi 0.2
lebar 0.8 0.16 28.32 m3 type 1
PLESTERAN + ACIAN
SLOOF 20/30
lebar 0.2
tinggi 0.3 0.06 10.62 m3
JENDELA
j1
panjang 1.99
lebar 1.02 2.0298
jumlah 21 42.6258 42.6258
Daun Jendela
0.9 0.62 0.558
0.78 0.48 0.3744
0.1836
2 0.3672 7.7112
21 7.7112 m2
j2
panjang 0
lebar 0 0
jumlah 0 0 0
42.6258 42.6258
PINTU
panjang 2.16
lebar 1.32 2.8512 8.5536
jumlah 3 8.5536 m2
Daun Pintu
2.1
1.22 7.686
3 7.686 m2
15.3972
DINDING
bawah
depan+belakang 39 3.45 2 269.1
samping 8 3.15 6 151.2
0.5 2.45 13 15.925
436.225
pengurangan
jendela + BV 42.6258
pintu 8.5536
51.1794
PLESTERAN 0 m2
KERAMIK 390 m2
pengecatan kusen
0.27 8.06 21 169.26
6.24 3 18.72
187.98 50.7546
50.7546 m2
pengecatan daun jendel dan pintu
kaca
JV 1 0.48 0.78 2 0.7488
0.92 0.57 1 0.5244
1.2732
21 26.7372 m2
Roster 21 3 63
54 m2
lantai 2
balok latei
panjang 49
lebar 0.12
tinggi 0.12
0.7056 m3
SANWERING 10/30
panjang 0
lebar 0.1
tinggi 0.3
0 m3
dinding
28 4 4 448
14.25 4 8 456
24 4 1 96
904
0.95 28 26.6
27 0.2 0.6 3.24
23.36
7.2
3.2
4
7.5 2.7 2 40.5
835.6806
lisplank
41 2 82
12 2 24
106
0.3 31.8
bubungan
29 1 29
7.1 4 28.4
57.4 m'
plafond 41 12
492 m2
kuda-kuda 41 29 35
6.89 241.15
482.3
12 7.1 42.6
85.2
567.5 m2
624.25
bouplank
82
24
Σ 106
62.4
780
1.5
0.2
0.2
0.5
2.4
39
8.6625
0.46575
112
0.3
33.6
156
0.2 perhitungan sengkang
31.2
kolom 30x35 0.3 x 0.35
tinggi 3.5 panjang besi sengkang 1.24
jumlah besi 12 tinggi 3.45
kolom 28 jarak antar sengkang 0.2
bj diameter 16 1.58 17.25
18
dibulatkan
jumlah berat besi struktur 1858.08
jumlah berat besi sengkang 243.734
jumlah total besi 2101.81
28
0.2
5.6
BEKISTING 70.4
4.485 125.58
21 33.18
929.04
0.26 0.31
1.24
3.45 23
24 29.76
11.6064 324.9792
1254.0192 KG
1858.08 125.58
17.25
243.7344
2101.8144
jumlah
2 3.98
4 4.08
8.06 m'
ukuran kayu
0.06 0.15 0.07254 m3 1.5233 m3
3.047
3 0
4 0
0 m'
ukuran kayu
0.06 0.15 0 m3 0 m3
2 4.32
1 1.32
ukuran kayu 6.24
0.06 0.15 0.05616 m3 0.1685 0.337
1.6918 m3
Luas 639 m2
44 4 176
14.25 8 114
4 3 12
302 m'
keliling
panjang 1.2
lebar 1.2 0
tinggi 1.5 2.16
jumlah 0 0 m3 pelat 2
jumlah galian 328.52 m3
panjang 1.2
lebar 1.2
tinggi 0.1 0.144
jumlah 0 0 m3 pelat 2
jumlah pasir alas pondasi 33.176 m3
PASIR ALAS LANTAI
tinggi 0.1 63.9 m3
lantai atas
LANTAI KERJA t. 5 cm
tinggi 0.05 31.95 m3
panjang 1
lebar 1
tinggi 0.1 0.1
jumlah 0 0 m3 pelat 2
jumlah lantai kerja pondasi 38.574 m3
AANSTAMPING
tinggi 0.2
lebar 0.8 0.16 48.32 m3 type 1
PLESTERAN + ACIAN
SLOOF 20/30
lebar 0.2
tinggi 0.3 0.06 18.12 m3
80
36
JENDELA
j1
panjang 2.35
lebar 1.4 3.29
jumlah 16 52.64 105.28
Daun Jendela
0.57 0.82 0.4674
0.42 0.68 0.2856
0.1818
2 0.3636 11.6352
16 5.8176 m2
j2
panjang 2.35
lebar 0.5 1.175
jumlah 8 9.4 18.8
62.04 124.08
PINTU
panjang 2.1
lebar 1.4 2.94 94.08
jumlah 16 47.04 m2
Daun Pintu
2.1
1.4 94.08
16 47.04 m2
52.8576
DINDING
bawah
depan+belakang 44 3.4 4 598.4
samping 14.25 3.4 8 387.6
24 3.4 1 81.6
1067.6
pengurangan
jendela + BV 62.04
pintu 47.04
109.08
PLESTERAN 1917.04 m2
KERAMIK 639 m2
pengecatan kusen
0.27 21.7
6.2
27.9 7.533
7.533 m2
pengecatan daun jendel dan pintu
kaca
JV 1 0.4
0.7 0.28
2 0.56
16 22.84 m2
0.62
0.82 0.5084
1 0.5084
16
0.57
0.42 0.2394
3 0.7182
8
Roster
54 m2
lantai 2
balok latei
panjang 58.25
lebar 0.12
tinggi 0.12
0.8388 m3
SANWERING 10/30
panjang 0
lebar 0.1
tinggi 0.3
0 m3
dinding
46 4 4 736
14.25 4 8 456
24 4 1 96
1192
0.95 46 43.7
27 0.2 0.6 3.24
40.46
7.2
3.2
4
7.5 2.7 2 40.5
1082.88
lisplank
48 2 96
16.25 1 16.25
112.25
0.3 33.675
bubungan
42 1 42
2.7 4 10.8
7.2 4 28.8
81.6
plafond 48
16.25 889.25
11.5
9.5
kuda-kuda
26 32 230.4
38
7.2 460.8
16.25
7.2 117 599.7375
2.7
16.25 21.9375
8.26 14.42
20.58
7.38
212.8392
12.78 7.13 91.1214
303.9606
88
16.25
6
5
115.25
1278
1.5
0.2
0.2
0.5
2.4
127.8
0
1.3824
171
0.3
51.3
224
0.2
44.8
25.2
0.2
5.04
101.14
670,398.65 2,484,261.78 3,217,913.52 ### ###
jumlah
3 7.05
4 5.6
12.65 m'
ukuran kayu
0.06 0.15 0.11385 m3 1.8216 m3
3 7.05
4 2
9.05 m'
ukuran kayu
0.06 0.15 0.08145 m3 0.6516 m3
2 4.2
1 1.4
ukuran kayu 6.2
0.06 0.15 0.0558 m3 0.8928
3.366 m3
Luas 42.75 m2
3 4 12
14.25 2 28.5
40.5 m'
keliling
panjang 1.2
lebar 1.2 0
tinggi 1.5 2.16
jumlah 0 0 m3 pelat 2
jumlah galian 61.2 m3
panjang 1.2
lebar 1.2
tinggi 0.1 0.144
jumlah 0 0 m3 pelat 2
jumlah pasir alas pondasi 5.592 m3
PASIR ALAS LANTAI
tinggi 0.1 4.275 m3
lantai atas
LANTAI KERJA t. 5 cm
tinggi 0.05 2.1375 m3
panjang 1
lebar 1
tinggi 0.1 0.1
jumlah 0 0 m3 pelat 2
jumlah lantai kerja pondasi 3.8655 m3
AANSTAMPING
tinggi 0.2
lebar 0.8 0.16 6.48 m3 type 1
PLESTERAN + ACIAN
SLOOF 20/30
lebar 0.2
tinggi 0.3 0.06 2.43 m3
16
36
JENDELA
j1
panjang 2.35
lebar 1.4 3.29
jumlah 3 9.87 19.74
Daun Jendela
0.57 0.82 0.4674
0.42 0.68 0.2856
0.1818
2 0.3636 2.1816
3 1.0908 m2
j2
panjang 2.35
lebar 0.5 1.175
jumlah 2 2.35 4.7
12.22 24.44
PINTU
panjang 2.1
lebar 1.4 2.94 5.88
jumlah 1 2.94 m2
Daun Pintu
2.1
1.4 5.88
1 2.94 m2
4.0308
DINDING
bawah
depan+belakang 3 3.4 2 20.4
samping 14.25 3.4 2 96.9
12 2 1 24
141.3
pengurangan
jendela + BV 12.22
pintu 2.94
15.16
PLESTERAN 252.28 m2
KERAMIK 42.75 m2
pengecatan kusen
0.27 21.7
6.2
27.9 7.533
7.533 m2
pengecatan daun jendel dan pintu
kaca
JV 1 0.4
0.7 0.28
2 0.56
3 4.6416 m2
0.62
0.82 0.5084
1 0.5084
3
0.57
0.42 0.2394
3 0.7182
2
Roster
54 m2
lantai 2
balok latei
panjang 17.25
lebar 0.12
tinggi 0.12
0.2484 m3
SANWERING 10/30
panjang 0
lebar 0.1
tinggi 0.3
0 m3
dinding
12 4 4 192
14.25 4 8 456
24 4 1 96
648
0.95 12 11.4
27 0.2 0.6 3.24
8.16
7.2
3.2
4
7.5 2.7 2 40.5
600.5
lisplank
14 2 28
16.25 1 16.25
44.25
0.3 13.275
bubungan
42 1 42
2.7 4 10.8
7.2 4 28.8
81.6
plafond 14
16.25 336.75
11.5
9.5
kuda-kuda
26 32 230.4
38
7.2 460.8
16.25
7.2 117 599.7375
2.7
16.25 21.9375
8.26 14.42
20.58
7.38
212.8392
12.78 7.13 91.1214
303.9606
6
16.25
22.25
1.5
0.2
0.2
0.5
2.4
8.55
0
0.09216
28.5
0.3
8.55
240
0.2
48
0
0.2
0
56.55
670,398.65 2,484,261.78 643,582.70 2,384,891.30 3,028,474.01
jumlah
3 7.05
4 5.6
12.65 m'
ukuran kayu
0.06 0.15 0.11385 m3 0.34155 m3
3 7.05
4 2
9.05 m'
ukuran kayu
0.06 0.15 0.08145 m3 0.1629 m3
2 4.2
1 1.4
ukuran kayu 6.2
0.06 0.15 0.0558 m3 0.0558
0.56025 m3