Anda di halaman 1dari 113

DIMENSI

NO ITEM PEKERJAAN HIT


P L T

1 GALIAN TANAH 400.00 0.25 0.25 25.00


2 URUGAN KEMBALI

1 PEKERJAAN PAS. PONDASI PINGGIR 400.00 0.20 0.40 32.00


2 PAS. BATU ALAS 200.00 2.20 0.09 -

1 RABAT BETON 200.00 2.20 0.06 -

PLESTERAN 400.00 - 0.30


-
VOL SAT
285,000,000.00

50.00 m3 285,000,000.00
16.67 m3

64.00 m3
39.60 m3

26.40 m3

120.00 m2
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : PEMBANGUNAN JALAN PERTANIAN SEKTOR PERTANIAN
LOKASI : DESA SIDOPO KEC. BACAN BARAT UTARA
PELAKSANA : KELOMPOK TANI PAMANA MANDIRI DESA SIDOPO KEC. BACAN BARAT UTARA
VOLUME : 200 METER
SUMBER DANA : DANA ALOKASI KHUSUS (DAK)
TAHUN ANGGARAN : 2023

NO. URAIAN PEKERJAAN HARGA

A PEKERJAAN PENDAHULUAN DAN PELAPORAN Rp 15,109,100.00


B PEKERJAAN TANAH, PONDASI DAN PLESTERAN Rp 176,467,440.58
C PEKERJAAN BETON Rp 65,180,235.16

JUMLAH (A) Rp 256,756,775.74


PPN 11% (B) Rp 28,243,245.33
JUMLAH TOTAL (A+B) Rp 285,000,021.07
PEMBULATAN Rp 285,000,000.00

Terbilang : " Dua Ratus Delapan Puluh Lima Juta Rupiah"

Labuha, … Mei 2023


Pelakasana Disetujui Oleh
KELOMPOK TANI ………………. PEJABAT PEMBUAT KOMITMEN
DESA SIDOPO KEC. BACAN BARAT UTARA (PPK)

……………………… M. GAMAL SOERAIDY, SP


KETUA Nip : 19721020 200604 1 008

Mengetahui
KEPALA DINAS PERTANIAN, PERKEBUNAN DAN KETAHANAN PANGAN
KAB. HALMAHERA SELATAN

Ir. AGUS HERIAWAN, SP, S.Hut, M.Si, IPM


Nip : 19670817 198903 1 017
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN JALAN PERTANIAN SEKTOR PERTANIAN


LOKASI : DESA SIDOPO KEC. BACAN BARAT UTARA
PELAKSANA : KELOMPOK TANI PAMANA MANDIRI DESA SIDOPO KEC. BACAN BARAT UTARA
VOLUME : 200 METER
SUMBER DANA : DANA ALOKASI KHUSUS (DAK)
TAHUN ANGGARAN : 2023

NO. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN HARGA

A PEKERJAAN PENDAHULUAN DAN PELAPORAN

1 Pembersihan Awal 1.00 Ls Rp 3,759,100.00 Rp 3,759,100.00


2 Pembuatan direksi keet / gudang bahan 1.00 Ls Rp 6,000,000.00 Rp 6,000,000.00
3 Pembuatan dan pemasangan papan nama proyek 1.00 Ls Rp 500,000.00 Rp 500,000.00
4 Pengukuran dan Pemasangan Bouplank 1.00 Ls Rp 1,500,000.00 Rp 1,500,000.00
5 Dokumentasi dan Pelaporan 1.00 Ls Rp 3,350,000.00 Rp 3,350,000.00

JUMLAH Rp 15,109,100.00
B PEKERJAAN TANAH, PONDASI DAN PLESTERAN

1 Pek. Galian tanah Pondasi 50.00 m3 Rp 79,250.00 Rp 3,962,500.00


2 Pek. Urugan kembali tanah biasa galian pondasi 16.67 m3 Rp 26,416.67 Rp 440,277.78
4 Pek. Pondasi batu gunung / Batu Kali 64.00 m3 Rp 1,823,073.00 Rp 116,676,672.00
5 Pek. Pasangan batu Alas 39.60 m3 Rp 1,150,935.00 Rp 45,577,026.00
6 Pek. Plesteran Pondasi 120.00 m2 Rp 81,758.04 Rp 9,810,964.80

JUMLAH Rp 176,467,440.58
C PEKERJAAN BETON

1 Pek. Beton Lantai Kerja K225 Tbl. 06 cm 26.40 m3 Rp 2,468,948.30 Rp 65,180,235.16

JUMLAH Rp 65,180,235.16
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN PERSIAPAN

1 m' Pengukuran dan Pasang bouwplank SNI 03-2835-2002


0.012 m3 Kayu 5/7 kls III Rp 2,000,000.00 Rp 24,000.00
BAHAN 0.020 Kg Paku biasa 2"-5" Rp 32,000.00 Rp 640.00
0.007 m3 Kayu papan 3/20 kls III Rp 2,000,000.00 Rp 14,000.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.100 OH Tukang Kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 60,440.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 60,440.00

1 m2 Membersihkan lapangan dan perataan SNI 03-2835-2002


0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
TENAGA
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 18,500.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 18,500.00

1 m' Pembuatan pagar sementara dari seng gelombang tinggi 2 meter SNI 03-2835-2002
1.250 btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 118,750.00
2.500 kg PC Rp 2,946.00 Rp 7,365.00
1.200 lbr Seng gelombang BJLS 0.20 Rp 75,000.00 Rp 90,000.00
0.005 m3 Pasir beton Rp 600,000.00 Rp 3,000.00
BAHAN
0.009 m3 Koral beton 2/3 Rp 980,000.00 Rp 8,820.00
0.072 m3 Kayu 5/7 kls III Rp 2,000,000.00 Rp 144,000.00
0.060 kg Paku biasa 2"-5" Rp 32,000.00 Rp 1,920.00
0.450 ltr Meni besi Rp 50,000.00 Rp 22,500.00
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.400 OH Tukang kayu Rp 95,000.00 Rp 38,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.020 OH Mandor Rp 170,000.00 Rp 3,400.00
JUMLAH Rp 460,655.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 460,655.00

1 m2 Pembuatan Gudang semen dan peralatan SNI 03-2835-2002


1.700 Btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 161,500.00
0.210 m3 Kayu kls III Rp 2,000,000.00 Rp 420,000.00
0.300 Kg Paku biasa 2"-5" Rp 32,000.00 Rp 9,600.00
10.500 Kg PC Rp 2,946.00 Rp 30,933.00
BAHAN
0.030 m3 Pasir beton Rp 600,000.00 Rp 18,000.00
0.050 m3 Koral beton 2/3 Rp 980,000.00 Rp 49,000.00
1.500 Lbr Seng gelombang BJLS 0.20 Rp 75,000.00 Rp 112,500.00
0.250 Lbr Seng plat BJLS 0.25 Rp 75,000.00 Rp 18,750.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
2.000 OH Tukang kayu Rp 95,000.00 Rp 190,000.00
TENAGA
0.200 OH Kepala Tukang Rp 145,000.00 Rp 29,000.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 1,147,783.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,147,783.00

Analisa Harga Satuan Pekerjaan (AHSP)


PEKERJAAN TANAH

1 m3 Galian tanah biasa sedalam 1 meter SNI : 2835:2008


0.750 OH Pekerja Rp 100,000.00 Rp 75,000.00
TENAGA
0.025 OH Mandor Rp 170,000.00 Rp 4,250.00
JUMLAH Rp 79,250.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 79,250.00

1 m3 Galian tanah biasa sedalam 2 meter SNI : 2835:2008


0.900 OH Pekerja Rp 100,000.00 Rp 90,000.00
TENAGA
0.045 OH Mandor Rp 170,000.00 Rp 7,650.00
JUMLAH Rp 97,650.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 97,650.00

1 m3 Urugan kembali SNI : 2835:2008


Mengurug kembali dihitung dari 1/3 kali dari indeks pekerjaan galian
1 m3 Urugan kembali tanah biasa galian sedalam 1 meter Rp 79,250.00 Rp 26,416.67
1 m3 Urugan kembali tanah biasa galian sedalam 2 meter Rp 97,650.00 Rp 32,550.00
1 m3 Urugan kembali tanah biasa galian sedalam 3 meter Rp 116,390.00 Rp 38,796.67

1 m3 Urugan pasir SNI : 2835:2008


BAHAN 1.200 m3 Pasir urug Rp 550,000.00 Rp 660,000.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
TENAGA
0.010 OH Mandor Rp 170,000.00 Rp 1,700.00
JUMLAH Rp 691,700.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 691,700.00

1 m3 Sirtu padat untuk peninggian lantai bangunan SNI : 2835:2008


BAHAN 1.200 m3 Sirtu Rp 330,000.00 Rp 396,000.00
0.250 OH Pekerja Rp 100,000.00 Rp 25,000.00
TENAGA
0.025 OH Mandor Rp 170,000.00 Rp 4,250.00
JUMLAH Rp 425,250.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 425,250.00

1 m2 Lapisan ijuk tebal 10 cm, untuk bidang resapan SNI : 2835:2008


BAHAN 6.000 kg Ijuk Rp 35,000.00
Rp 210,000.00
0.150 OH Pekerja Rp 100,000.00
Rp 15,000.00
TENAGA
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH
Rp 227,550.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 227,550.00

PEKERJAAN PONDASI

1 m3 Pondasi batu belah 1 PC : 4 PP SNI : 2836:2008


1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
BAHAN 163.000 Kg PC Rp 2,946.00 Rp 480,198.00
0.520 m3 Pasir pasang Rp 600,000.00 Rp 312,000.00
1.500 OH Pekerja Rp 100,000.00 Rp 150,000.00
0.750 OH Tukang batu Rp 95,000.00 Rp 71,250.00
TENAGA
0.075 OH Kepala Tukang Rp 145,000.00 Rp 10,875.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 1,823,073.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,823,073.00

Analisa Harga Satuan Pekerjaan (AHSP)


1 m3 Pondasi batu kosong (aanstamping) SNI : 2836:2008
1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
BAHAN
0.432 m3 Pasir urug Rp 550,000.00 Rp 237,600.00
0.780 OH Pekerja Rp 100,000.00
Rp 78,000.00
0.390 OH Tukang batu Rp 95,000.00
Rp 37,050.00
TENAGA
0.039 OH Kepala Tukang Rp 145,000.00
Rp 5,655.00
0.039 OH Mandor Rp 170,000.00
Rp 6,630.00
JUMLAHRp 1,150,935.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,150,935.00

1 m3 Pondasi batu kosong (aanstamping) SNI : 2836:2008


1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
BAHAN
0.432 m3 Pasir urug Rp 550,000.00 Rp 237,600.00
0.780 OH Pekerja Rp 100,000.00 Rp 78,000.00
0.390 OH Tukang batu Rp 95,000.00 Rp 37,050.00
TENAGA
0.039 OH Kepala Tukang Rp 145,000.00 Rp 5,655.00
0.039 OH Mandor Rp 170,000.00 Rp 6,630.00
JUMLAH Rp 1,150,935.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,150,935.00

1 m3 Pondasi batu belah 1 PC : 4 PP SNI : 2836:2008


1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
BAHAN 163.000 Kg PC Rp 2,946.00 Rp 480,198.00
0.520 m3 Pasir pasang Rp 600,000.00 Rp 312,000.00
1.500 OH Pekerja Rp 100,000.00 Rp 150,000.00
0.750 OH Tukang batu Rp 95,000.00 Rp 71,250.00
TENAGA
0.075 OH Kepala Tukang Rp 145,000.00 Rp 10,875.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 1,823,073.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,823,073.00

PEKERJAAN BETON

1 m3 Beton mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0.87 SNI : 7394:2008
247.000 kg PC Rp 2,946.00 Rp 727,662.00
0.621 m3 Pasir beton Rp 600,000.00 Rp 372,428.57
BAHAN
0.740 m3 Koral beton 2/3 Rp 980,000.00 Rp 725,200.00
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00 Rp 3,987.50
0.083 OH Mandor Rp 170,000.00 Rp 14,025.00
JUMLAH Rp 2,141,928.07
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,141,928.07

1 m3 Beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0.78 SNI : 7394:2008
276.000 kg PC Rp 2,946.00 Rp 813,096.00
0.591 m3 Pasir beton Rp 600,000.00 Rp 354,857.14
BAHAN
0.750 m3 Koral beton 2/3 Rp 980,000.00 Rp 734,637.04
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00 Rp 3,987.50
0.083 OH Mandor Rp 170,000.00 Rp 14,025.00
JUMLAH Rp 2,219,227.68
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,219,227.68

Analisa Harga Satuan Pekerjaan (AHSP)


1 m3 Beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm, w/c = 0.72 SNI : 7394:2008
299.000 kg PC Rp 2,946.00 Rp 880,854.00
0.571 m3 Pasir beton Rp 600,000.00 Rp 342,428.57
BAHAN
0.753 m3 Koral beton 2/3 Rp 980,000.00 Rp 738,266.67
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00 Rp 3,987.50
0.083 OH Mandor Rp 170,000.00 Rp 14,025.00
JUMLAH Rp 2,278,186.74
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,278,186.74

1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm w/c =
SNI : 7394:2008
0.87
230.000 kg PC Rp 2,946.00 Rp 677,580.00
0.638 m3 Pasir beton Rp 600,000.00 Rp 382,714.29
BAHAN
0.761 m3 Koral beton 2/3 Rp 980,000.00 Rp 745,525.93
200.000 liter Air Rp 500.00 Rp 100,000.00
1.200 OH Pekerja Rp 100,000.00 Rp 120,000.00
0.200 OH Tukang batu Rp 95,000.00 Rp 19,000.00
TENAGA 0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.060 OH Mandor Rp 170,000.00 Rp 10,200.00

JUMLAH Rp 2,057,920.21
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,057,920.21

1 m3 Beton mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 SNI : 7394:2008
326.000 kg PC Rp 2,946.00 Rp 960,396.00
0.543 m3 Pasir beton Rp 600,000.00 Rp 325,714.29
BAHAN
0.762 m3 Koral beton 2/3 Rp 980,000.00 Rp 746,977.78
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00 Rp 4,060.00
0.083 OH Mandor Rp 170,000.00 Rp 14,110.00
JUMLAH Rp 2,349,883.06
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,349,883.06

1 m3 Beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61 SNI : 7394:2008
352.000 kg PC Rp 2,946.00 Rp 1,036,992.00
0.522 m3 Pasir beton Rp 600,000.00 Rp 313,285.71
BAHAN
0.764 m3 Koral beton 2/3 Rp 980,000.00 Rp 748,429.63
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA 0.028 OH Kepala Tukang Rp 145,000.00 Rp 4,060.00

0.083 OH Mandor Rp 170,000.00 Rp 14,110.00


JUMLAH Rp 2,415,502.34
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,415,502.34

Analisa Harga Satuan Pekerjaan (AHSP)


1 m3 Beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 SNI : 7394:2008
371.000 kg PC Rp 2,946.00 Rp 1,092,966.00
0.499 m3 Pasir beton Rp 600,000.00 Rp 299,142.86
BAHAN
0.776 m3 Koral beton 2/3 Rp 980,000.00 Rp 760,044.44
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00 Rp 4,060.00
0.083 OH Mandor Rp 170,000.00 Rp 14,110.00
JUMLAH Rp 2,468,948.30
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,468,948.30

1 m3 Beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 SNI : 7394:2008
384.000 kg PC Rp 2,946.00 Rp 1,131,264.00
0.494 m3 Pasir beton Rp 600,000.00 Rp 296,571.43
BAHAN
0.770 m3 Koral beton 2/3 Rp 980,000.00 Rp 754,237.04
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00 Rp 4,060.00
0.083 OH Mandor Rp 170,000.00 Rp 14,110.00
JUMLAH Rp 2,498,867.47
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,498,867.47

1 m3 Beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm, w/c = 0,53 SNI : 7394:2008
406.000 kg PC Rp 2,946.00 Rp 1,196,076.00
0.489 m3 Pasir beton Rp 600,000.00 Rp 293,142.86
BAHAN
0.760 m3 Koral beton 2/3 Rp 980,000.00 Rp 744,800.00
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00 Rp 4,060.00
0.083 OH Mandor Rp 170,000.00 Rp 14,110.00
JUMLAH Rp 2,550,813.86
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,550,813.86

1 m3 Beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 SNI : 7394:2008
413.000 kg PC Rp 2,946.00 Rp 1,216,698.00
0.486 m3 Pasir beton Rp 600,000.00 Rp 291,857.14
BAHAN
0.756 m3 Koral beton 2/3 Rp 980,000.00 Rp 741,170.37
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00 Rp 4,060.00
0.083 OH Mandor Rp 170,000.00 Rp 14,110.00
JUMLAH Rp 2,566,520.51
OVERHEAD & PROFIT 0% Rp -

HARGA SATUAN Rp 2,566,520.51

Analisa Harga Satuan Pekerjaan (AHSP)


1 m3 Beton mutu f'c = 28,8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0,49 SNI : 7394:2008
439.000 kg PC Rp 2,946.00 Rp 1,293,294.00
0.479 m3 Pasir beton Rp 600,000.00 Rp 287,142.86
BAHAN
0.745 m3 Koral beton 2/3 Rp 980,000.00 Rp 730,281.48
215.000 liter Air Rp 500.00 Rp 107,500.00
2.100 OH Pekerja Rp 100,000.00 Rp 210,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.105 OH Mandor Rp 170,000.00 Rp 17,850.00

JUMLAH Rp 2,684,393.34

OVERHEAD & PROFIT 0% Rp -


HARGA SATUAN Rp 2,684,393.34

1 m3 Beton mutu f'c = 31,2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0,48 SNI : 7394:2008
448.000 kg PC Rp 2,946.00 Rp 1,319,808.00
0.476 m3 Pasir beton Rp 600,000.00 Rp 285,857.14
BAHAN
0.741 m3 Koral beton 2/3 Rp 980,000.00 Rp 725,925.93
215.000 liter Air Rp 500.00 Rp 107,500.00
2.100 OH Pekerja Rp 100,000.00 Rp 210,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA 0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00

0.105 OH Mandor Rp 170,000.00 Rp 17,850.00

JUMLAH Rp 2,705,266.07
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,705,266.07
PEKERJAAN PLESTERAN

1 m2 Plesteran , 1 PC : 1 PP tebal 15 mm SNI : 2837:2008


15.504 kg PC Rp 2,946.00 Rp 45,674.78
BAHAN
0.016 m3 Pasir pasang Rp 600,000.00 Rp 9,600.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 104,249.78
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 104,249.78

1 m2 Plesteran , 1 PC : 2 PP tebal 15 mm SNI : 2837:2008


10.224 kg PC Rp 2,946.00 Rp 30,119.90
BAHAN
0.020 m3 Pasir pasang Rp 600,000.00 Rp 12,000.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 91,094.90
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 91,094.90

Analisa Harga Satuan Pekerjaan (AHSP)


1 m2 Plesteran , 1PC : 3PP tebal 15 mm SNI : 2837:2008
7.776 kg PC Rp 2,946.00 Rp 22,908.10
BAHAN
0.023 m3 Pasir pasang Rp 600,000.00 Rp 13,800.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 85,683.10
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 85,683.10

1 m2 Plesteran , 1PC : 4PP tebal 15 mm SNI : 2837:2008


6.240 kg PC Rp 2,946.00 Rp 18,383.04
BAHAN
0.024 m3 Pasir pasang Rp 600,000.00 Rp 14,400.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 81,758.04
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 81,758.04

1 m2 Acian SNI : 2837:2008


BAHAN 3.250 kg PC Rp 2,946.00 Rp 9,574.50
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.010 OH Mandor Rp 170,000.00 Rp 1,700.00
JUMLAH Rp 42,224.50
OVERHEAD & PROFIT 10% Rp 4,222.45
HARGA SATUAN Rp 46,446.95

Analisa Harga Satuan Pekerjaan (AHSP)


DAFTAR HARGA BAHAN DAN UPAH
KABUPATEN HALMAHERA SELATAN
TAHUN 2015

NO. URAIAN HARGA UPAH HARGA SAT

Mandor Rp 170,000.00 / oh
Kepala Tukang Rp 145,000.00 / oh
Tukang
Batu Rp 95,000.00 / oh
Kayu Rp 95,000.00 / oh
Besi Rp 95,000.00 / oh
Besi konstruksi Rp 95,000.00 / oh
Aluminium Rp 95,000.00 / oh
Las Rp 95,000.00 / oh
Cat Rp 95,000.00 / oh
Listrik Rp 95,000.00 / oh
Gali Rp 95,000.00 / oh
Pekerja Rp 100,000.00 / oh

NO. URAIAN HARGA BAHAN HARGA SAT

BAHAN DASAR
Air Rp 500.00 / liter
Pasir
Pasir Pasang Rp 600,000.00 / m3
Pasir Beton Rp 600,000.00 / m3
Pasir Urug Rp 550,000.00 / m3
Pasir Batu (Sirtu) Rp 330,000.00 / m3
Batu
Batu Bulat Rp 720,000.00 / m3
Batu Belah 15 - 20 Rp 655,000.00 / m3
10 - 15 Rp 655,000.00 / m3
Batu Pecah 5-7 Rp 980,000.00 / m3
3-5 Rp 980,000.00 / m3
Koral beton 2-3 Rp 980,000.00 / m3
Kerikil 0.5 - 1 Rp 720,000.00 / m3
Granit Rp 102,000.00 / kg
Teraso Rp 45,000.00 / kg
Teraso cor Rp 700,000.00 / m3
Semen
Semen Portland (PC)
ex. Tonasa / Setara @ 50 kg Rp 147,300.00 / zak
@ 1 kg Rp 2,946.00 / kg
Merah Rp 650,000.00 / m3
Warna Rp 4,500.00 / kg
Tanah
Tanah urug / Timbun Rp 395,000.00 / m3
Tanah merah Rp 300,000.00 / m3
Tanah Liat Rp 450,000.00 / m3
Tanah Humus Rp 600,000.00 / m3
Kapur
Pasang Rp 655,000.00 / m3
Sirih Rp 65,400.00 / kg

Daftar Harga Bahan dan Upah


NO. URAIAN HARGA BAHAN HARGA SAT

BAHAN KAYU
Kayu Kelas I
Balok Rp 5,200,000.00 / m3
Papan Rp 4,200,000.00 / m3
Kayu Kelas II
Balok Rp 3,000,000.00 / m3
Papan Rp 3,000,000.00 / m3
Kayu Kelas III
Balok Rp 2,000,000.00 / m3
Papan Rp 2,000,000.00 / m3
Kayu
Dolken Rp 1,900,000.00 / m3
Dolken Ф 8-15 4 meter Rp 95,000.00 / btg
Bambu
Ф 6-8 6 meter Rp 75,000.00 / btg
Ijuk Rp 35,000.00 / kg
Tali ijuk Rp 65,000.00 / kg
Bilik bambu Rp 350,000.00 / m2

BAHAN KAYU PABRIKAN


Plywood
12 mm Rp 300,000.00 / lbr
9 mm Rp 200,000.00 / lbr
Tripleks
6 mm Rp 120,000.00 / lbr
5 mm Rp 100,000.00 / lbr
3 mm Rp 85,000.00 / lbr
Teakwood
12 mm Rp 320,000.00 / lbr
9 mm Rp 245,000.00 / lbr
6 mm Rp 130,000.00 / lbr
5 mm Rp 120,000.00 / lbr
3 mm Rp 100,000.00 / lbr
Formika Rp 250,000.00 / lbr
Lem Kayu Rp 55,000.00 / kg

BAHAN BESI
Besi Beton
Polos Rp 25,000.00 / kg
Ulir Rp 30,000.00 / kg
Kawat
Duri Rp 75,000.00 / kg
Beton / bendrat Rp 30,000.00 / kg
Bronjong 4 mm Rp 50,000.00 / kg
Las Rp 75,000.00 / kg
BRC Lengkap dengan tiang Rp 450,000.00 / lbr
Pagar Kawat jaring Rp 350,000.00 / lbr
Angkur Ф 8 mm Rp 45,000.00 / kg
Jaring Kawat Baja (dilas) Rp 65,000.00 / kg
Besi
Strip Rp 45,000.00 / kg
Strip Rp 25,000.00 / m'
besi Strip (20 mm) 3 mm Rp 45,000.00 / kg
2 mm Rp 40,000.00 / kg
Profil Rp 75,000.00 / kg
Baja IWF Rp 80,000.00 / kg
Plat baja 2 mm Rp 45,000.00 / kg
Siku-siku 30 x 30 x 3 Rp 85,000.00 / kg
Scuare tube Rp 65,000.00 / m'
Besi lis kaca 1 x 1 cm Rp 65,000.00 / m'

Daftar Harga Bahan dan Upah


NO. URAIAN HARGA BAHAN HARGA SAT

Daftar Harga Bahan dan Upah


NO. URAIAN HARGA BAHAN HARGA SAT

BAHAN PAKU
Paku
biasa 2" - 5" Rp 32,000.00 / kg
0.5" - 1" Rp 35,000.00 / kg
Sekrup Rp 45,000.00 / kg
Sekrup 3.5" Rp 2,500.00 / bh
Sekrup fixer Rp 4,500.00 / bh
Pancing Rp 2,000.00 / bh
Payung / seng Rp 35,000.00 / kg
beton 2" - 5" Rp 95,000.00 / kg
Ramset Rp 5,000.00 / bh

BAHAN MINYAK
Minyak
Residu Rp 15,000.00 / liter
Bekisting Rp 5,000.00 / liter
Pelumas Rp 45,000.00 / liter
Solar Rp 10,000.00 / liter
Tinner Rp 15,000.00 / liter

BAHAN ATAP
Seng Gelombang
BJLS 0.20 Rp 75,000.00 / lbr
0.25 Rp 85,000.00 / lbr
0.30 Rp 110,000.00 / lbr
Seng Plat
BJLS 0.20 Rp 65,000.00 / lbr
0.25 Rp 75,000.00 / lbr
0.30 Rp 90,000.00 / lbr
Genteng
Kodok Rp 6,000.00 / bh
Palentong / Paris , kecil Rp 7,500.00 / bh
Beton Rp 4,500.00 / bh
Metal ex. Multiroof / Setara Rp 95,000.00 / bh
Bubung
Kodok / glazzur Rp 8,000.00 / bh
Palentong / Paris , kecil Rp 10,000.00 / bh
Beton Rp 10,000.00 / bh
Metal Rp 75,000.00 / bh
Stel gelombang 0.92 Rp 120,000.00 / lbr
Stel gelombang 1.05 Rp 130,000.00 / lbr
Asbes
Gelombang (2,25 x 0,92 m) x 5 mm Rp 160,000.00 / lbr
(1,5 x 0,92 m) x 5 mm Rp 130,000.00 / lbr
(3,0 x 1,05 m) x 4 mm Rp 120,000.00 / lbr
(2,40 x 1,05 m) x 4 mm Rp 110,000.00 / lbr
(2,10 x 1,05 m) x 4 mm Rp 100,000.00 / lbr
Alumunium foil / sisalation Rp 125,000.00 / m2

BAHAN MENI
Meni
Besi Rp 50,000.00 / liter
Kayu Rp 50,000.00 / liter

BAHAN DINDING
Bata
Bata merah Rp 3,000.00 / bh
Batako press Rp 6,500.00 / bh
Berongga expose 5 x 11 x 24 Rp 3,000.00 / bh
HB/CB
HB 20 Rp 7,500.00 / bh

Daftar Harga Bahan dan Upah


NO. URAIAN HARGA BAHAN HARGA SAT

15 Rp 6,000.00 / bh
10 Rp 5,000.00 / bh
Terawang
Rosster 12 x 11 x 24 Rp 7,500.00 / bh

Daftar Harga Bahan dan Upah


NO. URAIAN HARGA BAHAN HARGA SAT

BAHAN BETON
Storox - 100 Rp 100,000.00 / kg
PVC waterstop 150 Rp 95,000.00 / m'
200 Rp 100,000.00 / m'
230 Rp 105,000.00 / m'
Got U pracetak 20 cm Rp 120,000.00 / bh

BAHAN LANGIT-LANGIT
Asbes semen 4 mm Rp 65,000.00 / lbr
5 mm Rp 75,000.00 / lbr
6 mm Rp 85,000.00 / lbr
Akustik 30 x 30 Rp 65,000.00 / lbr
30 x 60 Rp 85,000.00 / lbr
60 x 120 Rp 110,000.00 / lbr
Gypsum board (120 x 240 mm) 9 mm Rp 210,000.00 / lbr
List profil
Gypsum 2" Rp 45,000.00 / m'
Kayu 2" Rp 25,000.00 / m'
Tepung gypsum Rp 65,000.00 / kg

BAHAN ALUMUNIUM
Profil
Alumunium "T" Rp 55,000.00 / m'

Daftar Harga Bahan dan Upah


NO. URAIAN HARGA BAHAN HARGA SAT

BAHAN PENUTUP LANTAI DAN DINDING


Ubin PC
Abu-abu 40 x 40 Rp 9,000.00 / bh
30 x 30 Rp 8,000.00 / bh
20 x 20 Rp 7,000.00 / bh
Warna 40 x 40 Rp 11,000.00 / bh
30 x 30 Rp 10,000.00 / bh
20 x 20 Rp 9,000.00 / bh
Ubin Teraso
40 x 40 Rp 25,000.00 / bh
30 x 30 Rp 11,818.18 / bh
Ubin Granit
60 x 60 Rp 96,666.67 / bh
40 x 40 Rp 31,666.67 / bh
30 x 30 Rp 16,363.64 / bh
Ubin Teralux marmer
60 x 60 Rp 96,666.67 / bh
40 x 40 Rp 31,666.67 / bh
30 x 30 Rp 16,363.64 / bh
Plint Ubin PC
Abu-abu 10 x 20 Rp 3,500.00 / bh
10 x 30 Rp 4,000.00 / bh
10 x 40 Rp 5,000.00 / bh
Warna 10 x 20 Rp 4,000.00 / bh
10 x 30 Rp 4,500.00 / bh
10 x 40 Rp 5,500.00 / bh
Plint Ubin Teraso
ex. Homogenius tile / Setara 10 x 30 Rp 8,500.00 / bh
10 x 40 Rp 9,500.00 / bh
Plint Ubin Granit
ex. Homogenius tile / Setara 10 x 60 Rp 12,500.00 / bh
10 x 40 Rp 10,500.00 / bh
10 x 30 Rp 9,000.00 / bh
Plint Ubin Teralux marmer
ex. Homogenius tile / Setara 10 x 40 Rp 9,000.00 / bh
10 x 30 Rp 8,000.00 / bh
10 x 60 Rp 12,000.00 / bh
Keramik
ex. roman / Setara 10 x 20 Rp 5,000.00 / bh
10 x 10 Rp 4,000.00 / bh
33 x 33 Rp 14,444.44 / bh
30 x 30 Rp 11,818.18 / bh
40 x 40 Rp 18,333.33 / bh
anti slip 30 x 30 Rp 13,181.82 / bh
20 x 20 Rp 5,800.00 / bh
anti slip 20 x 20 Rp 6,000.00 / bh
Keramik artistik
ex. roman / Setara 10 x 20 Rp 5,000.00 / bh
5 x 20 Rp 4,000.00 / bh
20 x 20 Rp 3,600.00 / bh
20 x 25 Rp 6,500.00 / bh
anti slip 30 x 30 Rp 13,181.82 / bh

Daftar Harga Bahan dan Upah


NO. URAIAN HARGA BAHAN HARGA SAT

20 x 20 Rp 5,800.00 / bh
anti slip 20 x 20 Rp 6,000.00 / bh
Mozaik 30 x 30 Rp 14,090.91 / bh
Plint Keramik
10 x 40 Rp 4,500.00 / bh
10 x 30 Rp 3,200.00 / bh
10 x 20 Rp 2,800.00 / bh
10 x 10 Rp 2,300.00 / bh
5 x 20 Rp 2,500.00 / bh
Porselen
11 x 11 Rp 5,000.00 / bh
10 x 20 Rp 5,800.00 / bh
20 x 20 Rp 7,200.00 / bh
Internal cove 5 x 5 x 20 Rp 12,000.00 / bh
Marmer ex. DN / setara 100 x 100 Rp 320,000.00 / bh
Karpet Rp 425,000.00 / m2
underlayer / rubber corrugate Rp 220,000.00 / m2
Parquet kayu Rp 550,000.00 / m2
Gymfloor Rp 650,000.00 / m2
Vinyl kayu kls. I 30 x 30 Rp 95,000.00 / bh
Vinyl karet 15 x 30 Rp 75,000.00 / bh
Lem vinil Rp 65,000.00 / kg
Dinding batu pelapis 3 x 7 x 24 Rp 25,000.00 / bh
Dinding batu paras Rp 25,000.00 / m2
Dinding batu tempel (minimalis) 20 x 40 Rp 250,000.00 / m2
Wallpaper lebar 50 cm Rp 200,000.00 / m2
Floor hardener Rp 65,000.00 / kg
Conblock 6 cm Rp 225,000.00 / m2
Conblock 8 cm Rp 240,000.00 / m2
Paving block 8 cm Rp 4,800.00 / bh

BAHAN PINTU JENDELA (PABRIKAN / RAKITAN)


Rolling door
Besi Rp 800,000.00 / m2
Alumunium Rp 750,000.00 / m2
Pintu Lipat
PVC Rp 750,000.00 / m2
Sunscreen Rp 750,000.00 / m2
Besi profil alumunium 4" Rp 155,000.00 / m'
3" Rp 145,000.00 / m'
Besi profil kaca Rp 90,000.00 / m'
Besi profil alumunium strip Rp 90,000.00 / m'
Sealent Rp 85,000.00 / tube
Tirai / vertikal blinds Rp 1,200,000.00 / m2
Kawat nyamuk Rp 45,000.00 / m2
Jendela nako Rp 1,250,000.00 / m2

BAHAN SANITASI DAN AIR


Kloset duduk / monoblok ex. Toto / setara Rp 1,750,000.00 / bh
Kloset jongkok ex. Toto / setara Rp 4,000,000.00 / bh
Urinoir ex. Toto / setara Rp 3,200,000.00 / bh
Washtafel ex. Toto / setara Rp 3,000,000.00 / bh

Daftar Harga Bahan dan Upah


NO. URAIAN HARGA BAHAN HARGA SAT

Kran air
Biasa 1/2" Rp 55,000.00 / bh
3/4" Rp 60,000.00 / bh
Floor drain stainless steel Rp 75,000.00 / bh
Sealtape Rp 8,000.00 / bh

BAHAN PIPA
Galvanis 1/2" Rp 85,000.00 / m'
PVC tipe AW 1/2" Rp 35,000.00 / m'
3/4" Rp 37,500.00 / m'
1" Rp 40,000.00 / m'
1 1/2" Rp 42,500.00 / m'
3" Rp 45,000.00 / m'
4" Rp 55,000.00 / m'
Paralon 5/8" Rp 90,000.00 / btg

BAHAN PENGGANTUNG DAN PENGUNCI


Kunci tanam
Besar Rp 250,000.00 / bh
kecil Rp 185,000.00 / bh
Bulat Stainless steel Rp 150,000.00 / bh
Kunci silinder Rp 200,000.00 / bh
Engsel
Pintu kuningan Rp 25,000.00 / bh
Jendela kuningan Rp 15,000.00 / bh
Jendela kupu-kupu Rp 20,000.00 / bh
Grendel
Pintu Rp 35,000.00 / bh
Jendela Rp 25,000.00 / bh
Kait angin / hak angin Rp 35,000.00 / bh
Gagang
Pintu Rp 250,000.00 / bh
Jendela Rp 50,000.00 / bh
Door closer Rp 350,000.00 / bh

BAHAN KACA
Kaca
Bening 3 mm Rp 250,000.00 / m2
5 mm Rp 275,000.00 / m2
12 mm Rp 750,000.00 / m2
Ryben 3 mm Rp 300,000.00 / m2
5 mm Rp 325,000.00 / m2
12 mm Rp 1,000,000.00 / m2

BAHAN CAT DAN FINISHING CAT


Plamir
Tembok ex. ……. Rp 60,000.00 / kg
Kayu ex. ……. Rp 55,000.00 / kg
Cat dasar
Tembok ex. Dulux / setara Rp 105,000.00 / kgl
Kayu ex. Dulux / setara Rp 80,000.00 / kgl
Cat penutup
Tembok ex. Dulux / setara Rp 85,000.00 / kgl
Kayu ex. Dulux / setara Rp 80,000.00 / kgl
Cat meni kayu Rp 85,000.00 / kgl
Cat meni tembok Rp 80,000.00 / kgl
Cat genteng Rp 80,000.00 / kgl
Teak oil Rp 90,000.00 / kgl
Politur Rp 90,000.00 / kgl
Politur jadi Rp 95,000.00 / kgl
Residu / ter Rp 15,000.00 / kgl
Vernis Rp 90,000.00 / kgl

Daftar Harga Bahan dan Upah


NO. URAIAN HARGA BAHAN HARGA SAT

Dempul Rp 75,000.00 / kg
Soda api Rp 55,000.00 / kg
Sabun Rp 35,000.00 / kg
Kwas biasa Rp 25,000.00 / bh
Ampelas Rp 15,000.00 / lbr

Daftar Harga Bahan dan Upah


NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN HARGA

PEKERJAAN UMUM DAN PERSIAPAN

1 m' Pengukuran dan Pasang bouwplank - m1 Rp 60,440.00 Rp -


1 m2 Membersihkan lapangan dan perataan - m2 Rp 18,500.00 Rp -
1 m2 Membuat jalan sementara - m2 Rp 300,950.00 Rp -
1 m' Pembuatan pagar sementara dari kayu tinggi 2 meter - m1 Rp 362,520.00 Rp -
1 m' Pembuatan pagar sementara dari seng gelombang tinggi 2 meter - m1 Rp 460,655.00 Rp -
1 m2 Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter - m2 Rp 2,044,432.00 Rp -
1 m2 Pembuatan Kantor sementara dengan lantai plesteran - m2 Rp 537,000.00 Rp -
1 m2 Pembuatan Gudang semen dan peralatan - m2 Rp 1,147,783.00 Rp -
1 m2 Pembuatan rumah jaga konstruksi kayu - m2 Rp 1,244,650.00 Rp -
1 m2 Pembuatan bedeng pekerja - m2 Rp 1,175,128.00 Rp -
1 m2 Pembuatan stegerl perancah dari bambu - m2 Rp 433,600.00 Rp -
1 m2 Pembuatan Bak adukan uk. 40 x 50 x 20 cm - m2 Rp 110,277.50 Rp -
1 m2 Pagar BRC lengkap dengan tiang - m2 Rp 267,357.00 Rp -
1 m1 Pagar Kawat jaring galvanis, tinggi 1 meter - m1 Rp 161,056.00 Rp -

PEKERJAAN TANAH

1 m3 Galian tanah biasa sedalam 1 meter - m3 Rp 79,250.00 Rp -


1 m3 Galian tanah biasa sedalam 2 meter - m3 Rp 97,650.00 Rp -
1 m3 Galian tanah biasa sedalam 3 meter - m2 Rp 116,390.00 Rp -
1 m3 Galian tanah keras sedalam 1 meter - m3 Rp 105,440.00 Rp -
1 m3 Galian tanah cadas sedalam 1 meter - m3 Rp 160,200.00 Rp -
1 m3 Galian tanah lumpur sedalam 1 meter - m3 Rp 127,650.00 Rp -
1 m2 Stripping tebing setinggi 1 meter - m2 Rp 5,850.00 Rp -
Membuang 1 m3 tanah sejauh 15 meter - m3 Rp 34,700.00 Rp -
1 m3 Urugan kembali tanah biasa galian sedalam 1 meter - m3 Rp 26,416.67 Rp -
1 m3 Urugan kembali tanah biasa galian sedalam 2 meter - m3 Rp 32,550.00 Rp -
1 m3 Urugan kembali tanah biasa galian sedalam 3 meter - m3 Rp 38,796.67 Rp -
Memadatkan 1 m3 tanah (per 20 cm) - m3 Rp 58,500.00 Rp -
1 m3 Urugan pasir - m3 Rp 691,700.00 Rp -
1 m3 Urugan Tanah - m3 Rp 463,750.00 Rp -
1 m3 Sirtu padat untuk peninggian lantai bangunan - m3 Rp 425,250.00 Rp -
1 m2 Lapisan ijuk tebal 10 cm, untuk bidang resapan - m2 Rp 227,550.00 Rp -
1 m3 Lapisan pudel camp. 1 KP : 3 PP : 7 TL untuk stabilisasi tanah - m3 Rp 892,425.00 Rp -
1 m3 Lapisan pudel camp. 1 KP : 5 TL untuk stabilisasi tanah - m3 Rp 857,840.00 Rp -

PEKERJAAN PONDASI

1 m3 Pondasi batu belah 1 PC : 3 PP - m3 Rp 1,916,967.00 Rp -


1 m3 Pondasi batu belah 1 PC : 4 PP - m3 Rp 1,823,073.00 Rp -
1 m3 Pondasi batu belah 1 PC : 5 PP - m3 Rp 1,757,931.00 Rp -
1 m3 Pondasi batu belah 1 PC : 6 PP - m3 Rp 1,712,157.00 Rp -
1 m3 Pondasi batu belah 1 PC : 8 PP - m3 Rp 1,649,361.00 Rp -
1 m3 Pondasi batu belah 1 KP : 1 SM : 2 PP - m3 Rp 1,456,725.00 Rp -
1 m3 Pondasi batu belah 1PC : 3 KP : 10 PP - m3 Rp 1,602,066.00 Rp -
1 m3 Pondasi batu belah 1/4 PC : 1 KP : 4 PP - m3 Rp 1,551,266.00 Rp -
1 m3 Pondasi batu kosong (aanstamping) - m3 Rp 1,150,935.00 Rp -
1 m3 Pondasi siklop, 60% beton camp. 1 PC : 2 PB : 3 KR & 40% batu belah - m3 Rp 5,197,739.00 Rp -
1 m3 Pondasi Sumuran, diameter 100 cm - m3 Rp 1,859,944.00 Rp -

PEKERJAAN DINDING

1 m2 Dinding Bata merah tebal 1 bata 1 PC : 2 PP - m2 Rp 683,151.00 Rp -


1 m2 Dinding Bata merah tebal 1 bata 1 PC : 3 PP - m2 Rp 658,670.70 Rp -
1 m2 Dinding Bata merah tebal 1 bata 1 PC : 4 PP - m2 Rp 641,016.30 Rp -
1 m2 Dinding Bata merah tebal 1 bata 1 PC : 5 PP - m2 Rp 633,601.20 Rp -
1 m2 Dinding Bata merah tebal 1 bata 1 PC : 6 PP - m2 Rp 634,701.00 Rp -
1 m2 Dinding Bata merah tebal 1 bata 1 PC : 3 KP : 10 PP - m2 Rp 610,208.18 Rp -
1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 2 PP - m2 Rp 332,126.70 Rp -
1 m2 Dinding Batako press tebal 1/2 bata 1 PC : 3 PP - m2 Rp 304,834.02 Rp -
1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 3 PP - m2 Rp 319,834.02 Rp -
1 m2 Dinding Batako press tebal 1/2 bata 1PC : 4PP - m2 Rp 298,179.00 Rp -
1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 4PP - m2 Rp 313,179.00 Rp -
1 m2 Dinding Batako press tebal 1/2 bata 1 PC : 5 PP - m2 Rp 294,017.28 Rp -
1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 5 PP - m2 Rp 309,017.28 Rp -
1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 6PP - m2 Rp 307,410.72 Rp -
1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 8 PP - m2 Rp 302,649.00 Rp -
1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 3 KP : 10PP - m2 Rp 306,582.00 Rp -
1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 1 SM : 1 PP - m2 Rp 287,790.00 Rp -
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN HARGA

1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 1 SM : 2 PP - m2 Rp 288,570.00 Rp -


1 m2 Dinding HB/CB 20, 1 PC : 3 PC - m2 Rp 686,957.72 Rp -
1 m2 Dinding HB/CB 20, 1 PC : 4 PC - m2 Rp 695,504.96 Rp -
1 m2 Dinding HB/CB 15, 1 PC : 3 PC - m2 Rp 532,452.04 Rp -
1 m2 Dinding HB/CB 15, 1 PC : 4 PC - m2 Rp 538,277.20 Rp -
1 m2 Dinding HB/CB 10, 1 PC : 3 PC - m2 Rp 381,661.36 Rp -
1 m2 Dinding HB/CB 10, 1 PC : 4 PC - m2 Rp 387,134.98 Rp -
1 m2 Dinding terawang (roster) uk. (12x11x24) cm, 1 PC : 3 PP - m2 Rp 333,694.00 Rp -
1 m2 Dinding terawang (roster) uk. (12x11x24) cm, 1 PC : 4 PP - m2 Rp 326,656.00 Rp -
1 m2 Dinding Bata berongga ekspose uk. (5x11x24), 1 PC : 3 PP - m2 Rp 319,419.00 Rp -

PEKERJAAN PLESTERAN

1 m2 Plesteran , 1 PC : 1 PP tebal 15 mm - m2 Rp 104,249.78 Rp -


1 m2 Plesteran , 1 PC : 2 PP tebal 15 mm - m2 Rp 91,094.90 Rp -
1 m2 Plesteran , 1PC : 3PP tebal 15 mm - m2 Rp 85,683.10 Rp -
1 m2 Plesteran , 1PC : 4PP tebal 15 mm - m2 Rp 81,758.04 Rp -
1 m2 Plesteran , 1 PC : 5 PP tebal 15 mm - m2 Rp 79,847.06 Rp -
1 m2 Plesteran , 1PC : 6PP tebal 15 mm - m2 Rp 78,184.54 Rp -
1 m2 Plesteran , 1PC : 7PP tebal 15 mm - m2 Rp 77,370.46 Rp -
1 m2 Plesteran , 1PC : 8PP tebal 15 mm - m2 Rp 76,556.38 Rp -
1 m2 Plesteran , 1 PC : 1/2 KP : 3 PP tebal 15 mm - m2 Rp 78,933.96 Rp -
1 m2 Plesteran , 1 PC : 2 KP : 8 PP tebal 15 mm - m2 Rp 76,313.00 Rp -
1 m2 Plesteran , 1 SM : 1 KP : 1 PP tebal 15 mm - m2 Rp 69,345.00 Rp -
1 m2 Plesteran , 1 SM : 1 KP : 2 PP tebal 15 mm - m2 Rp 70,335.00 Rp -
1 m2 Plesteran , 1 PC : 2 PP tebal 20 mm - m2 Rp 121,999.87 Rp -
1 m2 Plesteran , 1 PC : 3 PP tebal 20 mm - m2 Rp 114,784.13 Rp -
1 m2 Plesteran , 1PC : 4PP tebal 20 mm - m2 Rp 109,350.72 Rp -
1 m2 Plesteran , 1 PC : 5 PP tebal 20 mm - m2 Rp 107,002.75 Rp -
1 m2 Plesteran , 1 PC : 6 PP tebal 20 mm - m2 Rp 104,586.05 Rp -
1 m2 Plesteran , 1 SM : 6 KP : 2 PP tebal 20 mm - m2 Rp 94,375.00 Rp -
1 m2 Plesteran Barapen, 1 PC : 5 PP, tebal 15 mm - m2 Rp 55,359.56 Rp -
1 m' Plesteran Skoning, 1PC : 2PP lebar 10 mm - m2 Rp 61,753.00 Rp -
1 m2 Plesteran Granit, 1PC : 2 Granit, tebal 10 mm - m2 Rp 1,632,922.50 Rp -
1 m2 Plesteran Teraso, 1PC : 2 Batu teraso, tebal 10 mm - m2 Rp 777,922.50 Rp -
1 m2 Plesteran ciprat (kamprot), 1PC : 2PP - m2 Rp 59,826.72 Rp -
1 m2 Finishing siar pas. Dinding bata merah (= 20 m') - m2 Rp 33,643.67 Rp -
1 m2 Finishing siar pas. Dinding conblock ekspose (= 8 m') - m2 Rp 16,141.10 Rp -
1 m2 Finishing siar pas. Batu kali adukan 1 PC : 2 PP - m2 Rp 74,852.64 Rp -
1 m2 Acian - m2 Rp 42,224.50 Rp -

PEKERJAAN BETON

1 m3 Beton mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0.87 - m3 Rp 2,141,928.07 Rp -
1 m3 Beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0.78 - m3 Rp 2,219,227.68 Rp -
1 m3 Beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm, w/c = 0.72 - m3 Rp 2,278,186.74 Rp -
1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm w/c = 0.87 - m3 Rp 2,057,920.21 Rp -
1 m3 Beton mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 - m3 Rp 2,349,883.06 Rp -
1 m3 Beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61 - m3 Rp 2,415,502.34 Rp -
1 m3 Beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 - m3 Rp 2,468,948.30 Rp -
1 m3 Beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 - m3 Rp 2,498,867.47 Rp -
1 m3 Beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm, w/c = 0,53 - m3 Rp 2,550,813.86 Rp -
1 m3 Beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 - m3 Rp 2,566,520.51 Rp -
1 m3 Beton mutu f'c = 28,8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0,49 - m3 Rp 2,684,393.34 Rp -
1 m3 Beton mutu f'c = 31,2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0,48 - m3 Rp 2,705,266.07 Rp -
1 m3 Beton kedap air dengan strorox - 100 - m3 Rp 2,741,575.00 Rp -
1 m' PVC Waterstop lebar 150 mm - m' Rp 109,545.00 Rp -
1 m' PVC Waterstop lebar 200 mm - m' Rp 116,427.50 Rp -
1 m' PVC Waterstop lebar 230 - 320 mm - m' Rp 123,310.00 Rp -
Pembesian 1 kg dengan besi polos - kg Rp 28,234.50 Rp -
Pembesian 1 kg dengan besi ulir - kg Rp 33,484.50 Rp -
Pembesian 1 kg kabel presstressed polos / strands - kg Rp 27,640.00 Rp -
Pembesian 1 kg Jaring kawat baja/wire mesh - kg Rp 65,679.88 Rp -
1 m2 bekisting untuk pondasi - m2 Rp 174,990.00 Rp -
1 m2 bekisting untuk sloof - m2 Rp 184,990.00 Rp -
1 m2 bekisting untuk kolom - m2 Rp 506,545.00 Rp -
1 m2 bekisting untuk balok - m2 Rp 515,545.00 Rp -
1 m2 bekisting untuk plat lantai - m2 Rp 886,545.00 Rp -
1 m2 bekisting untuk tangga - m2 Rp 486,295.00 Rp -
1 m2 bekisting jembatan untuk pengecoran beton - m2 Rp 141,335.00 Rp -
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN HARGA

1 m' Kolom praktis beton bertulang (12 x 12) cm - m' Rp 4,625,950.41 Rp -


1 m' Balok latei beton bertulang, (10 x 15) cm - m' Rp 3,647,833.33 Rp -
1 m' Ring gunung beton bertulang, (12 x 15) cm - m' Rp 3,647,833.33 Rp -
1 m3 Membongkar bekisting - m3 Rp 400,000.00 Rp -
1 Titik Poor Plat Tul. 2 Lapis - 15 cm 80 x 80 - ttk Rp 1,205,840.00 Rp -
1 m3 Sloof beton 15 / 20 - m3 Rp 8,445,850.00 Rp -
1 m3 Kolom beton 25 / 25 - m3 Rp 9,625,208.00 Rp -
1 m3 Ringbalk beton 15 / 20 - m3 Rp 8,518,123.00 Rp -
1 m3 Plat beton Tul. 2 Lapis - 15 cm tebal 15 cm - m3 Rp 8,999,316.27 Rp -
1 m3 Plat beton Tul. 1 Lapis - 15 cm tebal 8 cm - m3 Rp 8,963,422.00 Rp -
1 m3 Kolom beton 15 / 15 - m3 Rp 9,648,884.00 Rp -
1 m3 Kolom beton 12 / 12 - m3 Rp 8,949,877.00 Rp -
1 m3 Sloof beton 12 / 15 - m3 Rp 9,135,606.00 Rp -
1 m3 Ringbalk beton 12 / 15 - m3 Rp 9,425,154.00 Rp -
1 m3 Kolom beton 20 / 20 - m3 Rp 7,652,476.00 Rp -

PEKERJAAN KAYU

1 m3 Membuat dan memasang kusen pintu/jendela kayu kelas I - m3 Rp 8,874,000.00 Rp -


1 m3 Membuat dan memasang kusen pintu/jendela kayu kls II - m3 Rp 6,317,000.00 Rp -
1 m3 Memasang kusen pintu/jendela lama - m3 Rp 905,666.67 Rp -
1 m2 Membuat dan memasang pintu klamp standar, kayu kelas II - m2 Rp 274,635.00 Rp -
1 m2 Membuat dan memasang pintu klamp sederhana, kayu kelas III untuk gudang sementara - m2 Rp 234,635.00 Rp -
1 m2 Membuat dan memasang daun pintu panel kayu kelas I - m2 Rp 672,500.00 Rp -
1 m2 Membuat dan memasang daun pintu panel kayu kelas II - m2 Rp 584,500.00 Rp -
1 m2 Memasang daun pintu panel lama - m2 Rp 154,833.33 Rp -
1 m2 Membuat dan memasang daun pintu/jendela kaca kayu kelas I - m2 Rp 490,900.00 Rp -
1 m2 Membuat dan memasang daun pintu/jendela kaca kayu kelas II - m2 Rp 438,100.00 Rp -
1 m2 Memasang daun pintu/jendela kaca lama - m2 Rp 122,033.33 Rp -
1 m2 Membuat dan memasang daun pintu dan jendela jalusi kayu kelas I - m2 Rp 797,300.00 Rp -
1 m2 Membuat dan memasang daun pintu dan jendela jalusi kayu kelas II - m2 Rp 584,500.00 Rp -
1 m2 Membuat dan memasang daun pintu lapis (plywood) rangkap, rangka tertutup, kayu kls II (lebar s/d 90
- m2 Rp 494,450.00 Rp -
cm)
1 m2 Membuat dan memasang daun pintu plywood rangkap, rangka ekspose, kayu kls II - m2 Rp 539,950.00 Rp -
1 m2 Memasang jalusi kusen kayu Kls I - m2 Rp 698,200.00 Rp -
1 m2 Memasang jalusi kusen kayu Kls II - m2 Rp 566,200.00 Rp -
1 m2 Membuat dan memasang teakwood rangkap, rangka ekspose, kayu kls I - m2 Rp 617,150.00 Rp -
1 m2 Membuat dan memasang teakwood rangkap lapis formika, rangka ekspose, kayu kls II - m2 Rp 736,500.00 Rp -
1 m3 Memasang konstruksi kuda-kuda kayu konvensional, kayu kls I bentang 6 meter - m3 Rp 8,322,200.00 Rp -
1 m3 Memasang konstruksi kuda-kuda ekspose, kayu kls I - m3 Rp 9,502,100.00 Rp -
1 m3 Memasang kuda-kuda lama - m3 Rp 1,463,950.00 Rp -
1 m3 Konstruksi Gording kayu kelas II - m3 Rp 5,119,800.00 Rp -
1 m3 Konstruksi Gording lama - m3 Rp 1,819,800.00 Rp -
1 m2 Rangka atap genteng keramik, kayu kls II - m2 Rp 82,600.00 Rp -
1 m2 Rangka atap genteng keramik, kayu kls II dan III - m2 Rp 79,000.00 Rp -
1 m2 Rangka atap genteng beton, kayu kls. II - m2 Rp 93,400.00 Rp -
1 m2 Rangka atap genteng keramik, kayu lama - m2 Rp 29,800.00 Rp -
1 m2 Rangka langit-langit, kayu kls II uk. (50x100) cm - m2 Rp 113,200.00 Rp -
1 m2 Rangka atap sirap, kayu kelas II - m2 Rp 527,560.00 Rp -
1 m2 Rangka langit-langit, kayu kls II uk. (50x100) cm - m2 Rp 113,200.00 Rp -
1 m2 Rangka langit-langit, kayu kls II uk. (60x60) cm - m2 Rp 122,500.00 Rp -
1 m2 Rangka langit-langit, kayu kls II uk. (100x100) cm - m2 Rp 94,325.00 Rp -
1 m2 Rangka langit-langit miring, kayu kls II uk. (100x100) cm - m2 Rp 75,045.00 Rp -
1 m2 Rangka langit-langit, kayu lama uk. (100x100) cm - m2 Rp 58,325.00 Rp -
1 m1 Memasang Lisplank uk. (3x20) cm kayu kls II - m' Rp 68,350.00 Rp -
1 m1 Memasang Lisplank uk. (3x30) cm kayu kls II - m' Rp 68,950.00 Rp -
1 m2 Rangka dinding pemisah, kayu kls II uk. (60x120) cm - m2 Rp 154,435.00 Rp -
1 m2 Membuat dan memasang dinding pemisah teakwood rangkap, rangka, kayu kls II - m2 Rp 271,235.00 Rp -
1 m2 Membuat dan memasang dinding pemisah Plywood rangkap, rangka, kayu kls II - m2 Rp 280,100.00 Rp -
1 m2 Membuat dan memasang dinding lambriziring dari papan kayu kls II - m2 Rp 293,150.00 Rp -
1 m2 Membuat dan memasang dinding lambriziring dari plywood uk. (120x140) cm - m2 Rp 46,705.00 Rp -
1 m2 Membuat dan memasang dinding bilik bambu, rangka kayu kls II - m2 Rp 663,784.00 Rp -
1 m1 Memasang riuter uk. (2x15) cm kayu kls II - m' Rp 43,350.00 Rp -
1 m1 Memasang winvier uk. (2x10) cm kayu kls II - m' Rp 40,350.00 Rp -
1 m2 Rangka langit-langit, kayu kls II uk. (120x120) cm - m2 Rp 94,050.00 Rp -
1 m3 Konstruksi Gording kayu kelas II - m3 Rp 4,444,800.00 Rp -
1 m3 Konstruksi balok nok kayu kelas II - m3 Rp 4,444,800.00 Rp -
1 m3 Konstruksi balok skor kayu kelas II - m3 Rp 6,864,800.00 Rp -

PEKERJAAN PENUTUP ATAP


NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN HARGA

1 m2 Memasang atap genteng kodok/glazzur - m2 Rp 174,645.00 Rp -


1 m2 Memasang atap genteng palentong/paris, kecil - m2 Rp 212,145.00 Rp -
1 m2 Memasang atap genteng beton - m2 Rp 74,110.00 Rp -
1 m2 Memasang atap genteng metal - m2 Rp 135,950.00 Rp -
1 m1 Memasang bubung genteng kodok/ glazzur - m' Rp 145,008.00 Rp -
1 m1 Memasang bubung genteng palentong/paris - m' Rp 155,008.00 Rp -
1 m1 Memasang nok genteng beton - m' Rp 154,356.80 Rp -
1 m1 Memasang nok genteng metal - m' Rp 127,885.00 Rp -
1 m2 Pasang atap asbes gelombang (2,25 x 0,92 m) x 5 mm - m2 Rp 119,885.00 Rp -
1 m2 Pasang atap asbes gelombang (1,5 x 0,92 m) x 5 mm - m2 Rp 117,345.00 Rp -
1 m2 Pasang atap asbes gelombang (3,0 x 1,05 m) x 4 mm - m2 Rp 65,095.00 Rp -
1 m2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm - m2 Rp 71,495.00 Rp -
1 m2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm - m2 Rp 73,810.00 Rp -
1 m' Pasang bubung stel gelombang 0,92 m - m' Rp 325,840.00 Rp -
1 m' Pasang bubung stel gelombang 1,05 m - m' Rp 310,840.00 Rp -
1 m2 Pasang atap seng gelombang BJLS 0.30 - m2 Rp 97,290.00 Rp -
1 m' Pasang atap nok seng - m' Rp 52,570.00 Rp -
1 m2 Pasang aluminium foil/ Sisalation - m2 Rp 153,085.00 Rp -
1 m2 Pasang atap seng gelombang BJLS 0.25 - m2 Rp 79,790.00 Rp -

PEKERJAAN LANGIT-LANGIT

1 m2 Memasang langit-langit asbes semen, tebal 4 mm, 5mm, 6 mm - m2 Rp 94,195.00 Rp -


1 m2 Memasang langit-langit akustik uk. (30 x 30) cm - m2 Rp 807,910.00 Rp -
1 m2 Memasang langit-langit akustik uk. (30 x 60) cm - m2 Rp 516,550.00 Rp -
1 m2 Memasang langit-langit akustik uk. (60 x 120) cm - m2 Rp 188,550.00 Rp -
1 m2 Memasang langit-langit tripleks uk. (120 x 240) cm, tebal 3-5 mm - m2 Rp 60,350.00 Rp -
1 m2 Memasang langit-langit lambriziring kayu, tebal 9 mm - m2 Rp 219,750.00 Rp -
1 m2 Memasang langit-langit gypsum board, uk. (1200 x 2400 x 9) mm - m2 Rp 97,715.00 Rp -
1 m1 Memasang list gypsum profil - m' Rp 70,080.00 Rp -
1 m1 Memasang list langit-langit kayu profil - m' Rp 40,735.00 Rp -
1 m2 Memasang langit-langit akustik, uk. (60 x 120) cm + rangka alumunium - m2 Rp 484,750.00 Rp -

PEKERJAAN LANTAI DAN DINDING

1 m2 Memasang Lantai ubin PC abu-abu ukuran (40 x 40) cm - m2 Rp 156,353.30 Rp -


1 m2 Memasang Lantai ubin PC abu-abu ukuran (30 x 30) cm - m2 Rp 193,865.00 Rp -
1 m2 Memasang Lantai ubin PC abu-abu ukuran (20 x 20) cm - m2 Rp 287,215.90 Rp -
1 m2 Memasang Lantai ubin PC warna ukuran (40 x 40) cm - m2 Rp 169,613.30 Rp -
1 m2 Memasang Lantai ubin PC warna ukuran (30 x 30) cm - m2 Rp 217,605.00 Rp -
1 m2 Memasang Lantai ubin PC warna ukuran (20 x 20) cm - m2 Rp 340,215.90 Rp -
1 m2 Memasang lantai ubin teraso uk.(40x40) cm - m2 Rp 268,283.30 Rp -
1 m2 Memasang lantai ubin teraso uk.(30x30) cm - m2 Rp 245,936.82 Rp -
1 m2 Memasang lantai ubin granit uk.(40x40) cm - m2 Rp 312,483.30 Rp -
1 m2 Memasang lantai ubin granit uk.(30x30) cm - m2 Rp 299,891.36 Rp -
1 m2 Memasang lantai ubin teralux uk.(40x40) cm - m2 Rp 312,483.30 Rp -
1 m2 Memasang lantai ubin teralux uk.(30x30) cm - m2 Rp 299,891.36 Rp -
1 m2 Memasang lantai ubin teralux marmer uk.(60x60) cm - m2 Rp 400,878.27 Rp -
1 m' Memasang plint ubin PC abu-abu uk.(10x20) cm - m' Rp 45,430.90 Rp -
1 m' Memasang plint ubin PC abu-abu uk.(10x30) cm - m' Rp 39,193.04 Rp -
1 m' Memasang plint ubin PC abu-abu uk.(10x40) cm - m' Rp 38,323.04 Rp -
1 m' Memasang plint ubin PC warna uk.(10x20) cm - m' Rp 46,428.44 Rp -
1 m' Memasang plint ubin PC warna uk.(10x30) cm - m' Rp 41,113.44 Rp -
1 m' Memasang plint ubin PC warna uk.(10x40) cm - m' Rp 39,803.44 Rp -
1 m' Memasang plint ubin teraso uk.(10x30) cm - m' Rp 55,233.44 Rp -
1 m' Memasang plint ubin teraso uk.(10x40) cm - m' Rp 50,403.44 Rp -
1 m' Memasang plint ubin granit uk.(10x40) cm - m' Rp 53,053.44 Rp -
1 m' Memasang plint ubin granit uk.(10x30) cm - m' Rp 56,998.44 Rp -
1 m' Memasang plint ubin teralux marmer uk.(10x40) cm - m' Rp 49,078.44 Rp -
1 m' Memasang plint ubin teralux marmer uk.(10x30) cm - m' Rp 53,468.44 Rp -
1 m' Memasang plint ubin teralux marmer uk.(10x60) cm - m' Rp 45,628.44 Rp -
1 m2 Memasang lantai teraso cor di tempat, tebal 3 cm - m2 Rp 83,970.00 Rp -
1 m2 Memasang lantai keramik artistik uk.(10x20) cm - m2 Rp 442,777.74 Rp -
1 m2 Memasang lantai keramik artistik uk.(10x10) cm / (5 x 20) cm - m2 Rp 603,802.74 Rp -
1 m2 Memasang lantai keramik uk.(33x33) cm - m2 Rp 317,137.18 Rp -
1 m2 Memasang lantai keramik uk.(30x30) cm - m2 Rp 317,766.82 Rp -
1 m2 Memasang lantai keramik uk.(30x30) cm anti slip - m2 Rp 333,953.18 Rp -
1 m2 Memasang lantai keramik uk.(20x20) cm - m2 Rp 332,903.40 Rp -
1 m2 Memasang lantai keramik uk.(20x20) cm anti slip - m2 Rp 338,203.40 Rp -
1 m1 Memasang plint keramik uk.(10x30) cm - m' Rp 36,609.44 Rp -
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN HARGA

1 m2 Memasang lantai mosaik uk.(30x30) cm camp. 1 PC : 3 PP - m2 Rp 355,619.99 Rp -


1 m' Memasang plint keramik uk.(10x20) cm - m' Rp 39,730.94 Rp -
1 m' Memasang plint kermik uk.(10x10) cm - m' Rp 49,383.44 Rp -
1 m' Memasang plint keramik uk.(5x20) cm - m' Rp 35,505.47 Rp -
1 m' Memasang plint internal cove artistik uk.(5x5x20) cm - m' Rp 232,793.44 Rp -
1 m2 Memasang lantai marmer uk.(100x100) cm - m2 Rp 507,527.74 Rp -
1 m2 Memasang lantai karpet - m2 Rp 506,060.00 Rp -
1 m2 Memasang underlayer / pelapis bawah karpet - m2 Rp 279,910.00 Rp -
1 m2 Memasang lantai parquet kayu - m2 Rp 730,775.00 Rp -
1 m2 Memasang lantai kayu ( gymfloor) - m2 Rp 835,775.00 Rp -
1 m2 Memasang dinding porselen uk.(11x11) cm - m2 Rp 638,197.80 Rp -
1 m2 Memasang dinding porselen uk.(10x20) cm - m2 Rp 504,897.80 Rp -
1 m2 Memasang dinding porselen uk.(20x20) cm - m2 Rp 384,652.80 Rp -
1 m2 Memasang dinding keramik artistik uk.(10x20) cm - m2 Rp 462,497.80 Rp -
1 m2 Memasang dinding keramik artistik uk.(5x20) cm - m2 Rp 622,172.80 Rp -
1 m2 Memasang dinding keramik uk.(20x20) cm - m2 Rp 289,252.80 Rp -
1 m2 Memasang dinding keramik uk.(20x25) cm - m2 Rp 329,906.80 Rp -
1 m2 Memasang dinding marmer uk.(100x100) cm - m2 Rp 891,283.24 Rp -
1 m2 Memasang dinding bata pelapis uk.(3 x 7 x 24) cm - m2 Rp 1,802,273.24 Rp -
1 m2 Memasang dinding batu paras - m2 Rp 197,390.50 Rp -
1 m2 Memasang dinding batu tempel hitam - m2 Rp 444,890.50 Rp -
1 m2 Memasang lantai Vinyl uk. 30 x 30 cm KL. I - m2 Rp 1,183,100.00 Rp -
1 m2 Memasang wall paper, lebar 50 cm - m2 Rp 510,673.75 Rp -
1 m2 Memasang floor hardener - m2 Rp 351,160.00 Rp -
1 m2 Memasang lantai Vinyl karet uk. 15 x 30 cm dengan perekat - m2 Rp 154,640.00 Rp -
1 m' Memasang plint kayu kls II tebal 2 cm lebar 10 cm - m' Rp 37,410.00 Rp -
1 m2 Memasang lantai ubin keramik uk.(40x40) cm - m2 Rp 224,083.30 Rp -
1 m' Memasang plint ubin keramik uk.(10x40) cm - m' Rp 38,478.44 Rp -
1 m2 Memasang lantai ubin granit uk.(60x60) cm - m2 Rp 400,878.27 Rp -

PEKERJAAN BESI

1 kg Pasang besi profil - m2 Rp 99,330.00 Rp -


1 kg Pasang rangka kuda-kuda baja IWF - m2 Rp 105,080.00 Rp -
100 kg Pekerjaan perakitan - m2 Rp 74,995.00 Rp -
1 m2 Pintu besi plat baja tebal 2 mm rangkap, rangkap baja siku - m2 Rp 2,983,565.00 Rp -
10 cm Pengelasan dengan las listrik - m' Rp 4,983.00 Rp -
1 m2 Membuat rangka jendela besi scuare tube (25 x 5 ) cm - m' Rp 844,605.00 Rp -
1 m2 Pasang pintu rolling door besi - m' Rp 996,420.00 Rp -
1 m2 Pasang pintu lipat (folding gate) bahan plastik / PVC - m' Rp 845,920.00 Rp -
1 m2 Pasang sunscreen alluminium - m2 Rp 846,280.00 Rp -
1 m2 Pasang rolling door aluminium - m2 Rp 968,000.00 Rp -
1 m' Pasang kusen pintu aluminium - m2 Rp 193,965.50 Rp -
1 m2 Pasang pintu aluminium strip lebar 8 cm - m2 Rp 1,970,521.50 Rp -
1 m2 Pasang pintu kaca rangka aluminium - m2 Rp 1,128,680.00 Rp -
1 m2 Pasang venetions blinds dan verical blinds (tirai) - m' Rp 1,276,300.00 Rp -
1 m2 Pasang terali besi strip (20 x 3) mm - m' Rp 838,649.64 Rp -
1 m2 Pasang kawat nyamuk - m2 Rp 352,161.13 Rp -
1 m2 Pasang jendela nako dan tralis - m' Rp 1,618,600.00 Rp -
1 m' Pasang talang datar/ jurai seng BJLS 25 lebar 90 cm - m2 Rp 199,600.00 Rp -
1 m' Pasang talang 1/2 lingkaran D-15 cm, seng plat BJLS 30 lebar 45 cm - m2 Rp 166,560.00 Rp -

PEKERJAAN SANITASI DAN AIR

1 buah Pasang kloset duduk/monoblok - bh Rp 2,316,845.00 Rp -


1 buah Pasang kloset jongkok - bh Rp 4,510,876.00 Rp -
1 buah urinoir - bh Rp 4,410,176.00 Rp -
1 buah washtafel - bh Rp 3,603,776.00 Rp -
1 buah bak mandi batu bata vol. 0,3 m3 - bh Rp 2,927,640.00 Rp -
1 buah bak kontrol batu bata uk. (60x60) cm, tinggi 65 cm - bh Rp 1,696,534.00 Rp -
1 m1 Pasang pipa galvanis dia 1/2" - m' Rp 151,595.00 Rp -
1 m1 Pasang pipa PVC tipe AW dia 1/2" - m' Rp 64,726.00 Rp -
1 m1 Pasang pipa PVC tipe AW dia 3/4" - m' Rp 68,601.00 Rp -
1 m1 Pasang pipa PVC tipe AW dia 1" - m' Rp 72,476.00 Rp -
1 m1 Pasang pipa PVC tipe AW dia 1,5" - m' Rp 76,351.00 Rp -
1 m1 Pasang pipa PVC tipe AW dia 3" - m' Rp 80,226.00 Rp -
1 m1 Pasang pipa PVC tipe AW dia 4" - m' Rp 95,726.00 Rp -
1 buah Pasang kran dia 1/2" dan 3/4" - bh Rp 68,000.00 Rp -
1 buah Pasang floordrain - bh Rp 87,800.00 Rp -
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN HARGA

PEKERJAAN PENGGANTUNG DAN PENGUNCI

1 buah Pasang kunci tanam biasa (besar) - bh Rp 300,800.00 Rp -


1 buah Pasang kunci tanam biasa (kecil) - bh Rp 235,800.00 Rp -
1 buah Pasang kunci silinder - bh Rp 249,150.00 Rp -
1 buah Pasang engsel pintu - bh Rp 43,052.50 Rp -
1 buah Pasang engsel jendela - bh Rp 27,035.00 Rp -
1 buah Pasang engsel jendela kupu-kupu - bh Rp 32,035.00 Rp -
1 buah Pasang grendel pintu - bh Rp 59,070.00 Rp -
1 buah Pasang grendel jendela - bh Rp 43,010.00 Rp -
1 buah Pasang hak angin - bh Rp 53,052.50 Rp -
1 buah Pasang pegangan pintu/ door holder - bh Rp 310,175.00 Rp -
1 buah Pasang pegangan jendela/handel - bh Rp 67,950.50 Rp -
1 buah Pasang door closer - bh Rp 410,175.00 Rp -
1 m2 Pasang kaca bening 3 mm - m2 Rp 293,052.50 Rp -
1 m2 Pasang kaca bening 5 mm - m2 Rp 320,552.50 Rp -
1 m2 Pasang kaca reyben 5 mm - m2 Rp 375,552.50 Rp -
1 buah Pasang kunci tanam bulat (kamar mandi) - bh Rp 200,800.00 Rp -

PEKERJAAN CAT

1 m2 Mengecat bidang kayu lama - m2 Rp 51,087.50 Rp -


1 m2 Mengecat bidang kayu baru - m2 Rp 68,800.00 Rp -
1 m2 Mengecat bidang tembok lama - m2 Rp 35,724.00 Rp -
1 m2 Mengecat bidang tembok baru - m2 Rp 47,923.50 Rp -
1 m2 Mengecat plafon eternit/ gypsum - m2 Rp 35,724.00 Rp -
1 m2 Mengecat genteng - m2 Rp 30,123.50 Rp -
1 m2 Pengikisan dan pengerokan permukaan cat lama - m2 Rp 18,260.00 Rp -
1 m2 Pencucian bidang permukaan tembok yang pernah dicat - m2 Rp 17,260.00 Rp -
1 m2 Pengecatan bidang kayu baru (1x plamir, 1x cat dasar, 2x cat penutup) - m2 Rp 80,280.00 Rp -
1 m2 Pengecatan bidang kayu baru (1x plamir, 1x cat dasar, 3x cat penutup) - m2 Rp 88,615.00 Rp -
1 m2 Pelaburan bidang kayu dengan teak oil - m2 Rp 43,723.50 Rp -
1 m2 Pelaburan bidang kayu dengan politur - m2 Rp 89,920.00 Rp -
1 m2 Pelaburan kayu dengan cat residu dan ter - m2 Rp 16,270.00 Rp -
1 m2 Pelaburan bidang kayu dengan vernis - m2 Rp 52,780.00 Rp -
1 m2 Pengecatan bidang tembok baru (1x plamir, 1x cat dasar, 2x cat penutup) - m2 Rp 47,923.50 Rp -
1 m2 Pengecatan bidang tembok lama (1x cat dasar, 2x cat penutup) - m2 Rp 35,809.00 Rp -
1 m2 Pengecatan bidang plafond baru (1x plamir, 1x cat dasar, 2x cat penutup) - m2 Rp 47,923.50 Rp -

PEKERJAAN LINGKUNGAN

1 m1 Memasang got U - 20 cm - m3 Rp 191,879.07 Rp -


1 m2 Memasang conblok, tebal 6 cm - m3 Rp 343,050.00 Rp -
1 m2 Memasang conblok, tebal 8 cm - m3 Rp 358,800.00 Rp -
1 m2 Memasang Paving block - m3 Rp 327,500.00 Rp -

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

1 titik Pasang Stop kontak - ttk Rp 337,750.00 Rp -


1 titik Pasang Saklar tunggal - ttk Rp 354,750.00 Rp -
1 titik Pasang Saklar ganda - ttk Rp 475,750.00 Rp -
1 buah Pasang Lampu TL 20 watt - bh Rp 123,625.00 Rp -
1 buah Pasang Lampu SL 18 watt - bh Rp 138,625.00 Rp -
1 buah Pasang Lampu Pijar 25 watt - bh Rp 123,625.00 Rp -
1 buah Pasang Panel box + MCB - bh Rp 544,725.00 Rp -

PEKERJAAN BONGKARAN

1 m3 Membongkar beton bertulang - m3 Rp 723,310.00 Rp -


1 m3 Membongkar dinding tembok bata merah - m3 Rp 215,300.00 Rp -
1 m2 Membongkar plesteran dinding - m2 Rp 9,250.00 Rp -
1 m2 Membongkar genteng dipakai lagi - m2 Rp 7,400.00 Rp -
1 m2 Membongkar reng/kaso-kaso dipakai lagi - m2 Rp 26,425.00 Rp -
1 m3 Membongkar kuda-kuda/gording dipakai lagi - m3 Rp 1,101,000.00 Rp -
1 m2 Membongkar rangka plafon dipakai lagi - m2 Rp 36,775.00 Rp -
PEKERJAAN PERSIAPAN

1 m' Pengukuran dan Pasang bouwplank SNI 03-2835-2002


0.012 m3 Kayu 5/7 kls III Rp 2,000,000.00 Rp 24,000.00
BAHAN 0.020 Kg Paku biasa 2"-5" Rp 32,000.00 Rp 640.00
0.007 m3 Kayu papan 3/20 kls III Rp 2,000,000.00 Rp 14,000.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.100 OH Tukang Kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 60,440.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 60,440.00

1 m2 Membersihkan lapangan dan perataan SNI 03-2835-2002


0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
TENAGA
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 18,500.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 18,500.00

1 m2 Membuat jalan sementara SNI 03-2835-2002


0.150 m3 Batu belah 15/20 Rp 655,000.00 Rp 98,250.00
BAHAN 0.090 m3 Batu pecah 5/7 Rp 980,000.00 Rp 88,200.00
0.010 m3 Pasir pasang Rp 600,000.00 Rp 6,000.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
TENAGA
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 300,950.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 300,950.00

1 m' Pembuatan pagar sementara dari kayu tinggi 2 meter SNI 03-2835-2002
1.250 btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 118,750.00
5.000 kg PC Rp 2,946.00 Rp 14,730.00
0.005 m3 Pasir beton Rp 600,000.00 Rp 3,000.00
BAHAN 0.009 m3 Koral beton 2/3 Rp 980,000.00 Rp 8,820.00
0.072 m3 Kayu 5/7 kls III Rp 2,000,000.00 Rp 144,000.00
0.060 kg Paku biasa 2"-5" Rp 32,000.00 Rp 1,920.00
0.400 ltr Residu Rp 15,000.00 Rp 6,000.00
0.400 OH Pekerja Rp 100,000.00 Rp 40,000.00
0.200 OH Tukang kayu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.020 OH Mandor Rp 170,000.00 Rp 3,400.00
JUMLAH Rp 362,520.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 362,520.00

1 m' Pembuatan pagar sementara dari seng gelombang tinggi 2 meter SNI 03-2835-2002
1.250 btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 118,750.00
2.500 kg PC Rp 2,946.00 Rp 7,365.00
1.200 lbr Seng gelombang BJLS 0.20 Rp 75,000.00 Rp 90,000.00
0.005 m3 Pasir beton Rp 600,000.00 Rp 3,000.00
BAHAN
0.009 m3 Koral beton 2/3 Rp 980,000.00 Rp 8,820.00
0.072 m3 Kayu 5/7 kls III Rp 2,000,000.00 Rp 144,000.00
0.060 kg Paku biasa 2"-5" Rp 32,000.00 Rp 1,920.00
0.450 ltr Meni besi Rp 50,000.00 Rp 22,500.00
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.400 OH Tukang kayu Rp 95,000.00 Rp 38,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.020 OH Mandor Rp 170,000.00 Rp 3,400.00
JUMLAH Rp 460,655.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 460,655.00
1 m2 Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter SNI 03-2835-2002
1.000 btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 95,000.00
2.000 kg PC Rp 2,946.00 Rp 5,892.00
25.000 m Kawat duri Rp 75,000.00 Rp 1,875,000.00
BAHAN
0.005 m3 Pasir beton Rp 600,000.00 Rp 3,000.00
0.009 m3 Koral beton 2/3 Rp 980,000.00 Rp 8,820.00
0.060 kg Paku biasa 2"-5" Rp 32,000.00 Rp 1,920.00
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.300 OH Tukang kayu Rp 95,000.00 Rp 28,500.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.020 OH Mandor Rp 170,000.00 Rp 3,400.00
JUMLAH Rp 2,044,432.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,044,432.00

1 m2 Pembuatan Kantor sementara dengan lantai plesteran SNI 03-2835-2002


1.250 Btg Dolken kayu Ф 8-10 / 400 cm Rp - Rp -
0.180 m3 Kayu kls III Rp - Rp -
0.850 m3 Batu belah 15/20 Rp - Rp -
0.300 Kg Paku biasa 2"-5" Rp - Rp -
1.100 Kg Besi Strip Rp - Rp -
35.000 Kg PC Rp - Rp -
0.150 m3 Pasir pasang Rp - Rp -
BAHAN 0.100 m3 Pasir beton Rp - Rp -
0.150 M3 Koral beton 2/3 Rp - Rp -
30.000 Bh Batako press Rp - Rp -
0.250 Lbr Seng plat BJLS 0.25 Rp - Rp -
0.200 Bh Jendela nako Rp - Rp -
0.080 m2 Kaca polos Rp - Rp -
0.150 Bh Kunci tanam Rp - Rp -
0.060 Lbr Plywood 4 mm Rp - Rp -
2.000 OH Pekerja Rp 100,000.00 Rp 200,000.00
2.000 OH Tukang kayu Rp 95,000.00 Rp 190,000.00
TENAGA 1.000 OH Tukang Batu Rp 95,000.00 Rp 95,000.00
0.300 OH Kepala Tukang Rp 145,000.00 Rp 43,500.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 537,000.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 537,000.00

1 m2 Pembuatan Gudang semen dan peralatan SNI 03-2835-2002


1.700 Btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 161,500.00
0.210 m3 Kayu kls III Rp 2,000,000.00 Rp 420,000.00
0.300 Kg Paku biasa 2"-5" Rp 32,000.00 Rp 9,600.00
10.500 Kg PC Rp 2,946.00 Rp 30,933.00
BAHAN
0.030 m3 Pasir beton Rp 600,000.00 Rp 18,000.00
0.050 m3 Koral beton 2/3 Rp 980,000.00 Rp 49,000.00
1.500 Lbr Seng gelombang BJLS 0.20 Rp 75,000.00 Rp 112,500.00
0.250 Lbr Seng plat BJLS 0.25 Rp 75,000.00 Rp 18,750.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
2.000 OH Tukang kayu Rp 95,000.00 Rp 190,000.00
TENAGA
0.200 OH Kepala Tukang Rp 145,000.00 Rp 29,000.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 1,147,783.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,147,783.00

1 m2 Pembuatan rumah jaga konstruksi kayu SNI 03-2835-2002


3.000 Btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 285,000.00
0.276 m3 Kayu kls III Rp 2,000,000.00 Rp 552,000.00
BAHAN
0.700 Kg Paku biasa 2"-5" Rp 32,000.00 Rp 22,400.00
1.500 Lbr Seng gelombang BJLS 0.20 Rp 75,000.00 Rp 112,500.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
1.500 OH Tukang kayu Rp 95,000.00 Rp 142,500.00
TENAGA
0.150 OH Kepala Tukang Rp 145,000.00 Rp 21,750.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 1,244,650.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,244,650.00

1 m2 Pembuatan bedeng pekerja SNI 03-2835-2002


1.250 Btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 118,750.00
0.186 m3 Kayu kls III Rp 2,000,000.00 Rp 372,000.00
0.300 Kg Paku biasa 2"-5" Rp 32,000.00 Rp 9,600.00
18.000 Kg PC Rp 2,946.00 Rp 53,028.00
BAHAN
0.030 m3 Pasir beton Rp 600,000.00 Rp 18,000.00
0.050 m3 Koral beton 2/3 Rp 980,000.00 Rp 49,000.00
1.500 Lbr Seng gelombang BJLS 0.20 Rp 75,000.00 Rp 112,500.00
1.350 Lbr Plywood 3 mm Rp 85,000.00 Rp 114,750.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
2.000 OH Tukang kayu Rp 95,000.00 Rp 190,000.00
TENAGA
TENAGA
0.200 OH Kepala Tukang Rp 145,000.00 Rp 29,000.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 1,175,128.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,175,128.00

1 m2 Pembuatan stegerl perancah dari bambu SNI 03-2835-2002


1.250 btg Bambu Ф 6-8 / 600 cm Rp 75,000.00 Rp 93,750.00
BAHAN
0.190 kg Tali ijuk Rp 65,000.00 Rp 12,350.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
2.000 OH Tukang kayu Rp 95,000.00 Rp 190,000.00
TENAGA
0.200 OH Kepala Tukang Rp 145,000.00 Rp 29,000.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 433,600.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 433,600.00

1 m2 Pembuatan Bak adukan uk. 40 x 50 x 20 cm SNI 03-2835-2002


0.036 m3 Papan Kayu kls III Rp 2,000,000.00 Rp 72,000.00
BAHAN 0.004 m3 Balok 5/7 kls III Rp 2,000,000.00 Rp 7,000.00
0.080 kg Paku biasa 2"-5" Rp 32,000.00 Rp 2,560.00
0.300 OH Tukang kayu Rp 95,000.00 Rp 28,500.00
TENAGA
0.002 OH Kepala Tukang Rp 145,000.00 Rp 217.50
JUMLAH Rp 110,277.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 110,277.50

1 m2 Pagar BRC lengkap dengan tiang SNI 03-2835-2002


0.434 Lbr BRC lengkap dengan tiang Rp 450,000.00 Rp 195,300.00
2.000 kg PC Rp 2,946.00 Rp 5,892.00
BAHAN
0.005 m3 Pasir Beton Rp 600,000.00 Rp 3,000.00
0.009 m3 Koral beton 2/3 Rp 980,000.00 Rp 8,820.00
0.375 OH Pekerja Rp 100,000.00 Rp 37,500.00
0.125 OH Tukang Besi Rp 95,000.00 Rp 11,875.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00 Rp 1,740.00
0.019 OH Mandor Rp 170,000.00 Rp 3,230.00
JUMLAH Rp 267,357.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 267,357.00

1 m1 Pagar Kawat jaring galvanis, tinggi 1 meter SNI 03-2835-2002


BAHAN 0.434 Lbr Pagar kawat jaring Rp 350,000.00 Rp 151,900.00
0.042 OH Pekerja Rp 100,000.00 Rp 4,200.00
0.042 OH Tukang Besi Rp 95,000.00 Rp 3,990.00
TENAGA
0.004 OH Kepala Tukang Rp 145,000.00 Rp 609.00
0.002 OH Mandor Rp 170,000.00 Rp 357.00
JUMLAH Rp 161,056.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 161,056.00
PEKERJAAN TANAH

1 m3 Galian tanah biasa sedalam 1 meter SNI : 2835:2008


0.750 OH Pekerja Rp 100,000.00 Rp 75,000.00
TENAGA
0.025 OH Mandor Rp 170,000.00 Rp 4,250.00
JUMLAH Rp 79,250.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 79,250.00

1 m3 Galian tanah biasa sedalam 2 meter SNI : 2835:2008


0.900 OH Pekerja Rp 100,000.00 Rp 90,000.00
TENAGA
0.045 OH Mandor Rp 170,000.00 Rp 7,650.00
JUMLAH Rp 97,650.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 97,650.00

1 m3 Galian tanah biasa sedalam 3 meter SNI : 2835:2008


1.050 OH Pekerja Rp 100,000.00 Rp 105,000.00
TENAGA
0.067 OH Mandor Rp 170,000.00 Rp 11,390.00
JUMLAH Rp 116,390.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 116,390.00

1 m3 Galian tanah keras sedalam 1 meter SNI : 2835:2008


1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
TENAGA
0.032 OH Mandor Rp 170,000.00 Rp 5,440.00
JUMLAH Rp 105,440.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 105,440.00

1 m3 Galian tanah cadas sedalam 1 meter SNI : 2835:2008


1.500 OH Pekerja Rp 100,000.00 Rp 150,000.00
TENAGA
0.060 OH Mandor Rp 170,000.00 Rp 10,200.00
JUMLAH Rp 160,200.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 160,200.00

1 m3 Galian tanah lumpur sedalam 1 meter SNI : 2835:2008


1.200 OH Pekerja Rp 100,000.00 Rp 120,000.00
TENAGA
0.045 OH Mandor Rp 170,000.00 Rp 7,650.00
JUMLAH Rp 127,650.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 127,650.00

1 m2 Stripping tebing setinggi 1 meter SNI : 2835:2008


0.050 OH Pekerja Rp 100,000.00 Rp 5,000.00
TENAGA
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 5,850.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 5,850.00

Membuang 1 m3 tanah sejauh 15 meter SNI : 2835:2008


0.330 OH Pekerja Rp 100,000.00 Rp 33,000.00
TENAGA
0.010 OH Mandor Rp 170,000.00 Rp 1,700.00
JUMLAH Rp 34,700.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 34,700.00
1 m3 Urugan kembali SNI : 2835:2008
Mengurug kembali dihitung dari 1/3 kali dari indeks pekerjaan galian
1 m3 Urugan kembali tanah biasa galian sedalam 1 meter Rp 79,250.00 Rp 26,416.67
1 m3 Urugan kembali tanah biasa galian sedalam 2 meter Rp 97,650.00 Rp 32,550.00
1 m3 Urugan kembali tanah biasa galian sedalam 3 meter Rp 116,390.00 Rp 38,796.67

Memadatkan 1 m3 tanah (per 20 cm) SNI : 2835:2008


0.500 OH Pekerja Rp 100,000.00 Rp 50,000.00
TENAGA
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 58,500.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 58,500.00

1 m3 Urugan pasir SNI : 2835:2008


BAHAN 1.200 m3 Pasir urug Rp 550,000.00
Rp 660,000.00
0.300 OH Pekerja Rp 100,000.00
Rp 30,000.00
TENAGA
0.010 OH Mandor Rp 170,000.00
Rp 1,700.00
JUMLAH
Rp 691,700.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 691,700.00

1 m3 Urugan Tanah SNI : 2835:2008


BAHAN 1.100 m3 Tanah urug Rp 395,000.00 Rp 434,500.00
0.250 OH Pekerja Rp 100,000.00 Rp 25,000.00
TENAGA
0.025 OH Mandor Rp 170,000.00 Rp 4,250.00
JUMLAH Rp 463,750.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 463,750.00

1 m3 Sirtu padat untuk peninggian lantai bangunan SNI : 2835:2008


BAHAN 1.200 m3 Sirtu Rp 330,000.00 Rp 396,000.00
0.250 OH Pekerja Rp 100,000.00 Rp 25,000.00
TENAGA
0.025 OH Mandor Rp 170,000.00 Rp 4,250.00
JUMLAH Rp 425,250.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 425,250.00

1 m2 Lapisan ijuk tebal 10 cm, untuk bidang resapan SNI : 2835:2008


BAHAN 6.000 kg Ijuk Rp 35,000.00 Rp 210,000.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
TENAGA
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 227,550.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 227,550.00

1 m3 Lapisan pudel camp. 1 KP : 3 PP : 7 TL untuk stabilisasi tanah SNI : 2835:2008


0.135 m3 Kapur Pasang Rp 655,000.00 Rp 88,425.00
BAHAN 0.400 m3 Pasir Pasang Rp 600,000.00 Rp 240,000.00
0.948 m3 Tanah Liat Rp 450,000.00 Rp 426,600.00
0.800 OH Pekerja Rp 100,000.00
Rp 80,000.00
0.400 OH Tukang Batu Rp 95,000.00
Rp 38,000.00
TENAGA
0.040 OH Kepala Tukang Rp 145,000.00
Rp 5,800.00
0.080 OH Mandor Rp 170,000.00
Rp 13,600.00
JUMLAH
Rp 892,425.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 892,425.00
PEKERJAAN PONDASI

1 m3 Pondasi batu belah 1 PC : 3 PP SNI : 2836:2008


1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
BAHAN 202.000 Kg PC Rp 2,946.00 Rp 595,092.00
0.485 m3 Pasir pasang Rp 600,000.00 Rp 291,000.00
1.500 OH Pekerja Rp 100,000.00 Rp 150,000.00
0.750 OH Tukang batu Rp 95,000.00 Rp 71,250.00
TENAGA
0.075 OH Kepala Tukang Rp 145,000.00 Rp 10,875.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 1,916,967.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,916,967.00

1 m3 Pondasi batu belah 1 PC : 4 PP SNI : 2836:2008


1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
BAHAN 163.000 Kg PC Rp 2,946.00 Rp 480,198.00
0.520 m3 Pasir pasang Rp 600,000.00
Rp 312,000.00
1.500 OH Pekerja Rp 100,000.00
Rp 150,000.00
0.750 OH Tukang batu Rp 95,000.00
Rp 71,250.00
TENAGA
0.075 OH Kepala Tukang Rp 145,000.00
Rp 10,875.00
0.075 OH Mandor Rp 170,000.00
Rp 12,750.00
JUMLAH Rp 1,823,073.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,823,073.00

1 m3 Pondasi batu belah 1 PC : 5 PP SNI : 2836:2008


1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
BAHAN 136.000 Kg PC Rp 2,946.00 Rp 400,656.00
0.544 m3 Pasir pasang Rp 600,000.00
Rp 326,400.00
1.500 OH Pekerja Rp 100,000.00
Rp 150,000.00
0.750 OH Tukang batu Rp 95,000.00
Rp 71,250.00
TENAGA
0.075 OH Kepala Tukang Rp 145,000.00
Rp 10,875.00
0.075 OH Mandor Rp 170,000.00
Rp 12,750.00
JUMLAH Rp 1,757,931.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,757,931.00

1 m3 Pondasi batu belah 1 PC : 6 PP SNI : 2836:2008


1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
BAHAN 117.000 Kg PC Rp 2,946.00 Rp 344,682.00
0.561 m3 Pasir pasang Rp 600,000.00
Rp 336,600.00
1.500 OH Pekerja Rp 100,000.00
Rp 150,000.00
0.750 OH Tukang batu Rp 95,000.00
Rp 71,250.00
TENAGA
0.075 OH Kepala Tukang Rp 145,000.00
Rp 10,875.00
0.075 OH Mandor Rp 170,000.00
Rp 12,750.00
JUMLAH Rp 1,712,157.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,712,157.00
1 m3 Pondasi batu belah 1 PC : 8 PP SNI : 2836:2008
1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
BAHAN 91.000 Kg PC Rp 2,946.00 Rp 268,086.00
0.584 m3 Pasir pasang Rp 600,000.00 Rp 350,400.00
1.500 OH Pekerja Rp 100,000.00 Rp 150,000.00
0.750 OH Tukang batu Rp 95,000.00 Rp 71,250.00
TENAGA
0.075 OH Kepala Tukang Rp 145,000.00 Rp 10,875.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 1,649,361.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,649,361.00

1 m3 Pondasi batu belah 1 KP : 1 SM : 2 PP SNI : 2836:2008


1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
0.170 m3 Kapur pasang Rp 655,000.00 Rp 111,350.00
BAHAN
0.170 m3 Semen Merah Rp 650,000.00 Rp 110,500.00
0.340 m3 Pasir pasang Rp 600,000.00 Rp 204,000.00
1.500 OH Pekerja Rp 100,000.00 Rp 150,000.00
0.750 OH Tukang batu Rp 95,000.00 Rp 71,250.00
TENAGA
0.075 OH Kepala Tukang Rp 145,000.00 Rp 10,875.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 1,456,725.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,456,725.00

1 m3 Pondasi batu belah 1PC : 3 KP : 10 PP SNI : 2836:2008


1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
61.000 Kg PC Rp 2,946.00 Rp 179,706.00
BAHAN
0.147 m3 Kapur pasang Rp 655,000.00 Rp 96,285.00
0.492 m3 Pasir pasang Rp 600,000.00 Rp 295,200.00
1.500 OH Pekerja Rp 100,000.00 Rp 150,000.00
0.750 OH Tukang batu Rp 95,000.00 Rp 71,250.00
TENAGA
0.075 OH Kepala Tukang Rp 145,000.00 Rp 10,875.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 1,602,066.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,602,066.00

1 m3 Pondasi batu belah 1/4 PC : 1 KP : 4 PP SNI : 2836:2008


1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
41.000 Kg PC Rp 2,946.00 Rp 120,786.00
BAHAN
0.131 m3 Kapur pasang Rp 655,000.00 Rp 85,805.00
0.523 m3 Pasir pasang Rp 600,000.00 Rp 313,800.00
1.500 OH Pekerja Rp 100,000.00 Rp 150,000.00
0.750 OH Tukang batu Rp 95,000.00
Rp 71,250.00
TENAGA
0.075 OH Kepala Tukang Rp 145,000.00
Rp 10,875.00
0.075 OH Mandor Rp 170,000.00
Rp 12,750.00
JUMLAH Rp 1,551,266.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,551,266.00
1 m3 Pondasi batu kosong (aanstamping) SNI : 2836:2008
1.200 m3 Batu belah 15/20 Rp 655,000.00 Rp 786,000.00
BAHAN
0.432 m3 Pasir urug Rp 550,000.00 Rp 237,600.00
0.780 OH Pekerja Rp 100,000.00 Rp 78,000.00
0.390 OH Tukang batu Rp 95,000.00 Rp 37,050.00
TENAGA
0.039 OH Kepala Tukang Rp 145,000.00 Rp 5,655.00
0.039 OH Mandor Rp 170,000.00 Rp 6,630.00
JUMLAH Rp 1,150,935.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,150,935.00

1 m3 Pondasi siklop, 60% beton camp. 1 PC : 2 PB : 3 KR & 40% batu


SNI : 2836:2008
belah
0.480 m3 Batu belah 15/20 Rp 655,000.00 Rp 314,400.00
194.000 Kg PC Rp 2,946.00 Rp 571,524.00
0.312 m3 Pasir Beton Rp 600,000.00 Rp 187,200.00
BAHAN
0.468 m3 Koral beton 2/3 Rp 980,000.00 Rp 458,640.00
126.000 kg Besi Beton polos Rp 25,000.00 Rp 3,150,000.00
1.800 Kg Kawat Beton Rp 30,000.00 Rp 54,000.00
3.400 OH Pekerja Rp 100,000.00 Rp 340,000.00
0.850 OH Tukang batu Rp 95,000.00 Rp 80,750.00
TENAGA
0.085 OH Kepala Tukang Rp 145,000.00 Rp 12,325.00
0.170 OH Mandor Rp 170,000.00 Rp 28,900.00
JUMLAH Rp 5,197,739.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 5,197,739.00

1 m3 Pondasi Sumuran, diameter 100 cm SNI : 2836:2008


0.450 m3 Batu belah 15/20 Rp 655,000.00 Rp 294,750.00
194.000 Kg PC Rp 2,946.00 Rp 571,524.00
BAHAN
0.312 m3 Pasir Beton Rp 600,000.00 Rp 187,200.00
0.468 m3 Koral beton 2/3 Rp 980,000.00 Rp 458,640.00
2.400 OH Pekerja Rp 100,000.00 Rp 240,000.00
0.800 OH Tukang batu Rp 95,000.00 Rp 76,000.00
TENAGA
0.080 OH Kepala Tukang Rp 145,000.00 Rp 11,600.00
0.119 OH Mandor Rp 170,000.00 Rp 20,230.00
JUMLAH Rp 1,859,944.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,859,944.00
PEKERJAAN DINDING

1 m2 Dinding Bata merah tebal 1 bata 1 PC : 2 PP SNI : 6897:2008


140.000 bh Batu bata Rp 3,000.00 Rp 420,000.00
BAHAN 43.500 kg PC Rp 2,946.00 Rp 128,151.00
0.080 m3 Pasir pasang Rp 600,000.00 Rp 48,000.00
0.600 OH Pekerja Rp 100,000.00 Rp 60,000.00
0.200 OH Tukang batu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.030 OH Mandor Rp 170,000.00 Rp 5,100.00
JUMLAH Rp 683,151.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 683,151.00

1 m2 Dinding Bata merah tebal 1 bata 1 PC : 3 PP SNI : 6897:2008


140.000 bh Batu bata Rp 3,000.00 Rp 420,000.00
BAHAN 32.950 kg PC Rp 2,946.00 Rp 97,070.70
0.091 m3 Pasir pasang Rp 600,000.00 Rp 54,600.00
0.600 OH Pekerja Rp 100,000.00 Rp 60,000.00
0.200 OH Tukang batu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.030 OH Mandor Rp 170,000.00 Rp 5,100.00
JUMLAH Rp 658,670.70
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 658,670.70

1 m2 Dinding Bata merah tebal 1 bata 1 PC : 4 PP SNI : 6897:2008


140.000 bh Batu bata Rp 3,000.00 Rp 420,000.00
BAHAN 26.550 kg PC Rp 2,946.00 Rp 78,216.30
0.093 m3 Pasir pasang Rp 600,000.00 Rp 55,800.00
0.600 OH Pekerja Rp 100,000.00 Rp 60,000.00
0.200 OH Tukang batu Rp 95,000.00
Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00
Rp 2,900.00
0.030 OH Mandor Rp 170,000.00
Rp 5,100.00
JUMLAH Rp 641,016.30
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 641,016.30

1 m2 Dinding Bata merah tebal 1 bata 1 PC : 5 PP SNI : 6897:2008


140.000 bh Batu bata Rp 3,000.00 Rp 420,000.00
BAHAN 22.200 kg PC Rp 2,946.00 Rp 65,401.20
0.102 m3 Pasir pasang Rp 600,000.00
Rp 61,200.00
0.600 OH Pekerja Rp 100,000.00
Rp 60,000.00
0.200 OH Tukang batu Rp 95,000.00
Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00
Rp 2,900.00
0.030 OH Mandor Rp 170,000.00
Rp 5,100.00
JUMLAH Rp 633,601.20
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 633,601.20

1 m2 Dinding Bata merah tebal 1 bata 1 PC : 6 PP SNI : 6897:2008


140.000 bh Batu bata Rp 3,000.00 Rp 420,000.00
BAHAN 18.500 kg PC Rp 2,946.00 Rp 54,501.00
0.122 m3 Pasir pasang Rp 600,000.00 Rp 73,200.00
0.600 OH Pekerja Rp 100,000.00 Rp 60,000.00
0.200 OH Tukang batu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.030 OH Mandor Rp 170,000.00 Rp 5,100.00
JUMLAH Rp 634,701.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 634,701.00
1 m2 Dinding Bata merah tebal 1 bata 1 PC : 3 KP : 10 PP SNI : 6897:2008
140.000 bh Batu bata Rp 3,000.00 Rp 420,000.00
10.080 kg PC Rp 2,946.00 Rp 29,695.68
BAHAN
0.093 m3 Pasir pasang Rp 600,000.00 Rp 55,500.00
0.028 m3 Kapur Pasang Rp 655,000.00 Rp 18,012.50
0.600 OH Pekerja Rp 100,000.00
Rp 60,000.00
0.200 OH Tukang batu Rp 95,000.00
Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00
Rp 2,900.00
0.030 OH Mandor Rp 170,000.00
Rp 5,100.00
JUMLAH Rp 610,208.18
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 610,208.18

1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 2 PP SNI : 6897:2008


70.000 bh Batu bata Rp 3,000.00 Rp 210,000.00
BAHAN 18.950 kg PC Rp 2,946.00 Rp 55,826.70
0.038 m3 Pasir pasang Rp 600,000.00 Rp 22,800.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 332,126.70
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 332,126.70

1 m2 Dinding Batako press tebal 1/2 bata 1 PC : 3 PP SNI : 6897:2008


30.000 bh Batako Press Rp 6,500.00 Rp 195,000.00
BAHAN 14.370 kg PC Rp 2,946.00 Rp 42,334.02
0.040 m3 Pasir pasang Rp 600,000.00
Rp 24,000.00
0.300 OH Pekerja Rp 100,000.00
Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00
Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00
Rp 1,450.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 304,834.02
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 304,834.02

1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 3 PP SNI : 6897:2008


70.000 bh Batu bata Rp 3,000.00 Rp 210,000.00
BAHAN 14.370 kg PC Rp 2,946.00 Rp 42,334.02
0.040 m3 Pasir pasang Rp 600,000.00
Rp 24,000.00
0.300 OH Pekerja Rp 100,000.00
Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00
Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00
Rp 1,450.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 319,834.02
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 319,834.02
1 m2 Dinding Batako press tebal 1/2 bata 1PC : 4PP SNI : 6897:2008
30.000 bh Batako Press Rp 6,500.00 Rp 195,000.00
BAHAN 11.500 kg PC Rp 2,946.00 Rp 33,879.00
0.043 m3 Pasir pasang Rp 600,000.00 Rp 25,800.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 298,179.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 298,179.00

1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 4PP SNI : 6897:2008
70.000 bh Batu bata Rp 3,000.00 Rp 210,000.00
BAHAN 11.500 kg PC Rp 2,946.00 Rp 33,879.00
0.043 m3 Pasir pasang Rp 600,000.00 Rp 25,800.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 313,179.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 313,179.00

1 m2 Dinding Batako press tebal 1/2 bata 1 PC : 5 PP SNI : 6897:2008


30.000 bh Batako press Rp 6,500.00 Rp 195,000.00
BAHAN 9.680 kg PC Rp 2,946.00 Rp 28,517.28
0.045 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 294,017.28
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 294,017.28

1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 5 PP SNI : 6897:2008


70.000 bh Batu bata Rp 3,000.00 Rp 210,000.00
BAHAN 9.680 kg PC Rp 2,946.00 Rp 28,517.28
0.045 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 309,017.28
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 309,017.28
1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 6PP SNI : 6897:2008
70.000 bh Batu bata Rp 3,000.00 Rp 210,000.00
BAHAN 8.320 kg PC Rp 2,946.00 Rp 24,510.72
0.049 m3 Pasir pasang Rp 600,000.00 Rp 29,400.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 307,410.72
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 307,410.72

1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 8 PP SNI : 6897:2008


70.000 bh Batu bata Rp 3,000.00 Rp 210,000.00
BAHAN 6.500 kg PC Rp 2,946.00 Rp 19,149.00
0.050 m3 Pasir pasang Rp 600,000.00 Rp 30,000.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 302,649.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 302,649.00

1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 3 KP : 10PP SNI : 6897:2008
70.000 bh Batu bata Rp 3,000.00 Rp 210,000.00
4.500 kg PC Rp 2,946.00 Rp 13,257.00
BAHAN
0.015 m3 Kapur pasang Rp 655,000.00 Rp 9,825.00
0.050 m3 Pasir pasang Rp 600,000.00 Rp 30,000.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 306,582.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 306,582.00

1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 1 SM : 1 PP SNI : 6897:2008


70.000 bh Batu bata Rp 3,000.00 Rp 210,000.00
0.018 m3 Semen Merah Rp 650,000.00 Rp 11,700.00
BAHAN
0.018 m3 Kapur pasang Rp 655,000.00 Rp 11,790.00
0.018 m3 Pasir pasang Rp 600,000.00 Rp 10,800.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 287,790.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 287,790.00

1 m2 Dinding Bata merah tebal 1/2 bata 1 PC : 1 SM : 2 PP SNI : 6897:2008


70.000 bh Batu bata Rp 3,000.00 Rp 210,000.00
0.014 m3 Semen Merah Rp 650,000.00 Rp 9,100.00
BAHAN
0.014 m3 Kapur pasang Rp 655,000.00 Rp 9,170.00
0.028 m3 Pasir pasang Rp 600,000.00 Rp 16,800.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 288,570.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 288,570.00

1 m2 Dinding HB/CB 20, 1 PC : 3 PC SNI : 6897:2008


12.500 bh HB 20 Rp 7,500.00 Rp 93,750.00
30.320 kg PC Rp 2,946.00 Rp 89,322.72
BAHAN
0.728 m3 Pasir Pasang Rp 600,000.00 Rp 436,800.00
0.280 kg Besi angkur dia. 8 mm Rp 45,000.00 Rp 12,600.00
0.350 OH Pekerja Rp 100,000.00 Rp 35,000.00
0.150 OH Tukang batu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.018 OH Mandor Rp 170,000.00 Rp 3,060.00
JUMLAH Rp 686,957.72
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 686,957.72

1 m2 Dinding HB/CB 20, 1 PC : 4 PC SNI : 6897:2008


12.500 bh HB 20 Rp 7,500.00 Rp 93,750.00
24.260 kg PC Rp 2,946.00 Rp 71,469.96
BAHAN
0.772 m3 Pasir Pasang Rp 600,000.00 Rp 463,200.00
0.280 kg Besi angkur dia. 8 mm Rp 45,000.00
Rp 12,600.00
0.350 OH Pekerja Rp 100,000.00
Rp 35,000.00
0.150 OH Tukang batu Rp 95,000.00
Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00
Rp 2,175.00
0.018 OH Mandor Rp 170,000.00
Rp 3,060.00
JUMLAH Rp 695,504.96
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 695,504.96

1 m2 Dinding HB/CB 15, 1 PC : 3 PC SNI : 6897:2008


12.500 bh HB 15 Rp 6,000.00 Rp 75,000.00
22.740 kg PC Rp 2,946.00 Rp 66,992.04
BAHAN
0.550 m3 Pasir Pasang Rp 600,000.00 Rp 330,000.00
0.280 kg Besi angkur dia. 8 mm Rp 45,000.00 Rp 12,600.00
0.320 OH Pekerja Rp 100,000.00 Rp 32,000.00
0.120 OH Tukang batu Rp 95,000.00 Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00 Rp 1,740.00
0.016 OH Mandor Rp 170,000.00 Rp 2,720.00
JUMLAH Rp 532,452.04
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 532,452.04

1 m2 Dinding HB/CB 15, 1 PC : 4 PC SNI : 6897:2008


12.500 bh HB 15 Rp 6,000.00 Rp 75,000.00
18.200 kg PC Rp 2,946.00 Rp 53,617.20
BAHAN
0.582 m3 Pasir Pasang Rp 600,000.00 Rp 349,200.00
0.280 kg Besi angkur dia. 8 mm Rp 45,000.00 Rp 12,600.00
0.320 OH Pekerja Rp 100,000.00 Rp 32,000.00
0.120 OH Tukang batu Rp 95,000.00 Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00 Rp 1,740.00
0.016 OH Mandor Rp 170,000.00 Rp 2,720.00
JUMLAH Rp 538,277.20
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 538,277.20

1 m2 Dinding HB/CB 10, 1 PC : 3 PC SNI : 6897:2008


12.500 bh HB 10 Rp 5,000.00 Rp 62,500.00
15.160 kg PC Rp 2,946.00 Rp 44,661.36
BAHAN
0.364 m3 Pasir Pasang Rp 600,000.00 Rp 218,400.00
0.280 kg Besi angkur dia. 8 mm Rp 45,000.00 Rp 12,600.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00
Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00
Rp 1,450.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 381,661.36
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 381,661.36
1 m2 Dinding HB/CB 10, 1 PC : 4 PC SNI : 6897:2008
12.500 bh HB 10 Rp 5,000.00 Rp 62,500.00
12.130 kg PC Rp 2,946.00 Rp 35,734.98
BAHAN
0.388 m3 Pasir Pasang Rp 600,000.00 Rp 232,800.00
0.280 kg Besi angkur dia. 8 mm Rp 45,000.00 Rp 12,600.00
0.300 OH Pekerja Rp 100,000.00
Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00
Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00
Rp 1,450.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 387,134.98
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 387,134.98
1 m2 Dinding terawang (roster) uk. (12x11x24) cm, 1 PC : 3 PP SNI : 6897:2008
30.000 bh Terawang (roster) Rp 7,500.00 Rp 225,000.00
BAHAN 14.000 kg PC Rp 2,946.00 Rp 41,244.00
0.032 m3 Pasir pasang Rp 600,000.00 Rp 19,200.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00
Rp 14,250.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00
Rp 1,450.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 333,694.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 333,694.00

1 m2 Dinding terawang (roster) uk. (12x11x24) cm, 1 PC : 4 PP SNI : 6897:2008


30.000 bh Terawang (roster) Rp 7,500.00 Rp 225,000.00
BAHAN 11.000 kg PC Rp 2,946.00 Rp 32,406.00
0.035 m3 Pasir pasang Rp 600,000.00 Rp 21,000.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00
Rp 14,250.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00
Rp 1,450.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 326,656.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 326,656.00

1 m2 Dinding Bata berongga ekspose uk. (5x11x24), 1 PC : 3 PP SNI : 6897:2008


70.000 bh Bata berongga ekspose Rp 3,000.00 Rp 210,000.00
BAHAN 14.000 kg PC Rp 2,946.00 Rp 41,244.00
0.032 m3 Pasir pasang Rp 600,000.00
Rp 19,200.00
0.300 OH Pekerja Rp 100,000.00
Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00
Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00
Rp 2,175.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 319,419.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 319,419.00
PEKERJAAN PLESTERAN

1 m2 Plesteran , 1 PC : 1 PP tebal 15 mm SNI : 2837:2008


15.504 kg PC Rp 2,946.00 Rp 45,674.78
BAHAN
0.016 m3 Pasir pasang Rp 600,000.00
Rp 9,600.00
0.300 OH Pekerja Rp 100,000.00
Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00
Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00
Rp 2,175.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 104,249.78
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 104,249.78

1 m2 Plesteran , 1 PC : 2 PP tebal 15 mm SNI : 2837:2008


10.224 kg PC Rp 2,946.00 Rp 30,119.90
BAHAN
0.020 m3 Pasir pasang Rp 600,000.00 Rp 12,000.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 91,094.90
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 91,094.90

1 m2 Plesteran , 1PC : 3PP tebal 15 mm SNI : 2837:2008


7.776 kg PC Rp 2,946.00 Rp 22,908.10
BAHAN
0.023 m3 Pasir pasang Rp 600,000.00 Rp 13,800.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 85,683.10
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 85,683.10

1 m2 Plesteran , 1PC : 4PP tebal 15 mm SNI : 2837:2008


6.240 kg PC Rp 2,946.00 Rp 18,383.04
BAHAN
0.024 m3 Pasir pasang Rp 600,000.00 Rp 14,400.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 81,758.04
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 81,758.04

1 m2 Plesteran , 1 PC : 5 PP tebal 15 mm SNI : 2837:2008


5.184 kg PC Rp 2,946.00 Rp 15,272.06
BAHAN
0.026 m3 Pasir pasang Rp 600,000.00
Rp 15,600.00
0.300 OH Pekerja Rp 100,000.00
Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00
Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00
Rp 2,175.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 79,847.06
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 79,847.06

1 m2 Plesteran , 1PC : 6PP tebal 15 mm SNI : 2837:2008


4.416 kg PC Rp 2,946.00 Rp 13,009.54
BAHAN
0.027 m3 Pasir pasang Rp 600,000.00 Rp 16,200.00
0.300 OH Pekerja Rp 100,000.00
Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00
Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00
Rp 2,175.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 78,184.54
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 78,184.54
1 m2 Plesteran , 1PC : 7PP tebal 15 mm SNI : 2837:2008
3.936 kg PC Rp 2,946.00 Rp 11,595.46
BAHAN
0.028 m3 Pasir pasang Rp 600,000.00 Rp 16,800.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 77,370.46
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 77,370.46

1 m2 Plesteran , 1PC : 8PP tebal 15 mm SNI : 2837:2008


3.456 kg PC Rp 2,946.00 Rp 10,181.38
BAHAN
0.029 m3 Pasir pasang Rp 600,000.00 Rp 17,400.00
0.300 OH Pekerja Rp 100,000.00
Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00
Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00
Rp 2,175.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 76,556.38
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 76,556.38

1 m2 Plesteran , 1 PC : 1/2 KP : 3 PP tebal 15 mm SNI : 2837:2008


5.760 kg PC Rp 2,946.00 Rp 16,968.96
BAHAN 0.003 m3 Kapur pasang Rp 655,000.00 Rp 1,965.00
0.013 m3 Pasir pasang Rp 600,000.00 Rp 7,800.00
0.360 OH Pekerja Rp 100,000.00
Rp 36,000.00
0.120 OH Tukang batu Rp 95,000.00
Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00
Rp 1,740.00
0.018 OH Mandor Rp 170,000.00
Rp 3,060.00
JUMLAH Rp 78,933.96
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 78,933.96

1 m2 Plesteran , 1 PC : 2 KP : 8 PP tebal 15 mm SNI : 2837:2008


3.000 kg PC Rp 2,946.00 Rp 8,838.00
BAHAN 0.005 m3 Kapur pasang Rp 655,000.00 Rp 3,275.00
0.020 m3 Pasir pasang Rp 600,000.00 Rp 12,000.00
0.360 OH Pekerja Rp 100,000.00
Rp 36,000.00
0.120 OH Tukang batu Rp 95,000.00
Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00
Rp 1,740.00
0.018 OH Mandor Rp 170,000.00
Rp 3,060.00
JUMLAH Rp 76,313.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 76,313.00

1 m2 Plesteran , 1 SM : 1 KP : 1 PP tebal 15 mm SNI : 2837:2008


0.009 m3 Semen Merah Rp 650,000.00 Rp 5,850.00
BAHAN 0.009 m3 Kapur pasang Rp 655,000.00 Rp 5,895.00
0.009 m3 Pasir pasang Rp 600,000.00 Rp 5,400.00
0.360 OH Pekerja Rp 100,000.00 Rp 36,000.00
0.120 OH Tukang batu Rp 95,000.00
Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00
Rp 1,740.00
0.018 OH Mandor Rp 170,000.00
Rp 3,060.00
JUMLAH Rp 69,345.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 69,345.00

1 m2 Plesteran , 1 SM : 1 KP : 2 PP tebal 15 mm SNI : 2837:2008


0.007 m3 Semen Merah Rp 650,000.00 Rp 4,550.00
BAHAN 0.007 m3 Kapur pasang Rp 655,000.00 Rp 4,585.00
0.015 m3 Pasir pasang Rp 600,000.00 Rp 9,000.00
0.360 OH Pekerja Rp 100,000.00 Rp 36,000.00
0.120 OH Tukang batu Rp 95,000.00
Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00
Rp 1,740.00
0.018 OH Mandor Rp 170,000.00
Rp 3,060.00
JUMLAH Rp 70,335.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 70,335.00
1 m2 Plesteran , 1 PC : 2 PP tebal 20 mm SNI : 2837:2008
13.632 kg PC Rp 2,946.00 Rp 40,159.87
BAHAN
0.027 m3 Pasir pasang Rp 600,000.00 Rp 16,200.00
0.400 OH Pekerja Rp 100,000.00 Rp 40,000.00
0.200 OH Tukang batu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.022 OH Mandor Rp 170,000.00 Rp 3,740.00
JUMLAH Rp 121,999.87
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 121,999.87

1 m2 Plesteran , 1 PC : 3 PP tebal 20 mm SNI : 2837:2008


10.368 kg PC Rp 2,946.00 Rp 30,544.13
BAHAN
0.031 m3 Pasir pasang Rp 600,000.00 Rp 18,600.00
0.400 OH Pekerja Rp 100,000.00
Rp 40,000.00
0.200 OH Tukang batu Rp 95,000.00
Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00
Rp 2,900.00
0.022 OH Mandor Rp 170,000.00
Rp 3,740.00
JUMLAH Rp 114,784.13
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 114,784.13

1 m2 Plesteran , 1PC : 4PP tebal 20 mm SNI : 2837:2008


8.320 kg PC Rp 2,946.00 Rp 24,510.72
BAHAN
0.032 m3 Pasir pasang Rp 600,000.00 Rp 19,200.00
0.400 OH Pekerja Rp 100,000.00 Rp 40,000.00
0.200 OH Tukang batu Rp 95,000.00
Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00
Rp 2,900.00
0.022 OH Mandor Rp 170,000.00
Rp 3,740.00
JUMLAH Rp 109,350.72
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 109,350.72

1 m2 Plesteran , 1 PC : 5 PP tebal 20 mm SNI : 2837:2008


6.912 kg PC Rp 2,946.00 Rp 20,362.75
BAHAN
0.035 m3 Pasir pasang Rp 600,000.00 Rp 21,000.00
0.400 OH Pekerja Rp 100,000.00 Rp 40,000.00
0.200 OH Tukang batu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.022 OH Mandor Rp 170,000.00 Rp 3,740.00
JUMLAH Rp 107,002.75
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 107,002.75

1 m2 Plesteran , 1 PC : 6 PP tebal 20 mm SNI : 2837:2008


5.888 kg PC Rp 2,946.00 Rp 17,346.05
BAHAN
0.036 m3 Pasir pasang Rp 600,000.00 Rp 21,600.00
0.400 OH Pekerja Rp 100,000.00 Rp 40,000.00
0.200 OH Tukang batu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.022 OH Mandor Rp 170,000.00 Rp 3,740.00
JUMLAH Rp 104,586.05
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 104,586.05

1 m2 Plesteran , 1 SM : 6 KP : 2 PP tebal 20 mm SNI : 2837:2008


0.009 m3 Semen Merah Rp 650,000.00 Rp 5,850.00
BAHAN 0.009 m3 Kapur Pasang Rp 655,000.00 Rp 5,895.00
0.018 m3 Pasir pasang Rp 600,000.00 Rp 10,800.00
0.440 OH Pekerja Rp 100,000.00 Rp 44,000.00
0.220 OH Tukang batu Rp 95,000.00 Rp 20,900.00
TENAGA
0.022 OH Kepala Tukang Rp 145,000.00 Rp 3,190.00
0.022 OH Mandor Rp 170,000.00 Rp 3,740.00
JUMLAH Rp 94,375.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 94,375.00
1 m2 Plesteran Barapen, 1 PC : 5 PP, tebal 15 mm SNI : 2837:2008
5.184 kg PC Rp 2,946.00 Rp 15,272.06
BAHAN
0.026 m3 Pasir pasang Rp 600,000.00 Rp 15,600.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.075 OH Tukang batu Rp 95,000.00 Rp 7,125.00
TENAGA
0.008 OH Kepala Tukang Rp 145,000.00 Rp 1,087.50
0.008 OH Mandor Rp 170,000.00 Rp 1,275.00
JUMLAH Rp 55,359.56
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 55,359.56

1 m' Plesteran Skoning, 1PC : 2PP lebar 10 mm SNI : 2837:2008


0.500 kg PC Rp 2,946.00 Rp 1,473.00
BAHAN
0.013 m3 Pasir pasang Rp 600,000.00 Rp 7,800.00
0.080 OH Pekerja Rp 100,000.00
Rp 8,000.00
0.400 OH Tukang batu Rp 95,000.00
Rp 38,000.00
TENAGA
0.040 OH Kepala Tukang Rp 145,000.00
Rp 5,800.00
0.004 OH Mandor Rp 170,000.00
Rp 680.00
JUMLAH Rp 61,753.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 61,753.00

1 m2 Plesteran Granit, 1PC : 2 Granit, tebal 10 mm SNI : 2837:2008


10.000 kg PC Rp 2,946.00 Rp 29,460.00
BAHAN
15.000 kg Batu granit Rp 102,000.00 Rp 1,530,000.00
0.450 OH Pekerja Rp 100,000.00 Rp 45,000.00
0.225 OH Tukang batu Rp 95,000.00
Rp 21,375.00
TENAGA
0.023 OH Kepala Tukang Rp 145,000.00
Rp 3,262.50
0.023 OH Mandor Rp 170,000.00
Rp 3,825.00
JUMLAH Rp 1,632,922.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,632,922.50

1 m2 Plesteran Teraso, 1PC : 2 Batu teraso, tebal 10 mm SNI : 2837:2008


10.000 kg PC Rp 2,946.00 Rp 29,460.00
BAHAN
15.000 kg Batu Teraso Rp 45,000.00 Rp 675,000.00
0.450 OH Pekerja Rp 100,000.00 Rp 45,000.00
0.225 OH Tukang batu Rp 95,000.00 Rp 21,375.00
TENAGA
0.023 OH Kepala Tukang Rp 145,000.00 Rp 3,262.50
0.023 OH Mandor Rp 170,000.00 Rp 3,825.00
JUMLAH Rp 777,922.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 777,922.50

1 m2 Plesteran ciprat (kamprot), 1PC : 2PP SNI : 2837:2008


4.320 kg PC Rp 2,946.00 Rp 12,726.72
BAHAN
0.006 m3 Pasir pasang Rp 600,000.00 Rp 3,600.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 59,826.72
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 59,826.72

1 m2 Finishing siar pas. Dinding bata merah (= 20 m') SNI : 2837:2008


BAHAN 3.108 kg PC Rp 2,946.00 Rp 9,156.17
0.150 OH Pekerja Rp 100,000.00
Rp 15,000.00
0.075 OH Tukang batu Rp 95,000.00
Rp 7,125.00
TENAGA
0.008 OH Kepala Tukang Rp 145,000.00
Rp 1,087.50
0.008 OH Mandor Rp 170,000.00
Rp 1,275.00
JUMLAH Rp 33,643.67
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 33,643.67
1 m2 Finishing siar pas. Dinding conblock ekspose (= 8 m') SNI : 2837:2008
BAHAN 1.600 kg PC Rp 2,946.00 Rp 4,713.60
0.070 OH Pekerja Rp 100,000.00
Rp 7,000.00
0.035 OH Tukang batu Rp 95,000.00
Rp 3,325.00
TENAGA
0.004 OH Kepala Tukang Rp 145,000.00
Rp 507.50
0.004 OH Mandor Rp 170,000.00
Rp 595.00
JUMLAH Rp 16,141.10
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 16,141.10

1 m2 Finishing siar pas. Batu kali adukan 1 PC : 2 PP SNI : 2837:2008


6.340 kg PC Rp 2,946.00 Rp 18,677.64
BAHAN
0.012 m3 Pasir pasang Rp 600,000.00 Rp 7,200.00
0.300 OH Pekerja Rp 100,000.00 Rp 30,000.00
0.150 OH Tukang batu Rp 95,000.00
Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00
Rp 2,175.00
0.015 OH Mandor Rp 170,000.00
Rp 2,550.00
JUMLAH Rp 74,852.64
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 74,852.64

1 m2 Acian SNI : 2837:2008


BAHAN 3.250 kg PC Rp 2,946.00 Rp 9,574.50
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.010 OH Mandor Rp 170,000.00 Rp 1,700.00
JUMLAH Rp 42,224.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 42,224.50
PEKERJAAN BETON

1 m3 Beton mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0.87 SNI : 7394:2008
247.000 kg PC Rp 2,946.00 Rp 727,662.00
0.621 m3 Pasir beton Rp 600,000.00 Rp 372,428.57
BAHAN
0.740 m3 Koral beton 2/3 Rp 980,000.00 Rp 725,200.00
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00
Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00
Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00
Rp 3,987.50
0.083 OH Mandor Rp 170,000.00
Rp 14,025.00
JUMLAH Rp 2,141,928.07
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,141,928.07

1 m3 Beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0.78 SNI : 7394:2008
276.000 kg PC Rp 2,946.00 Rp 813,096.00
0.591 m3 Pasir beton Rp 600,000.00 Rp 354,857.14
BAHAN
0.750 m3 Koral beton 2/3 Rp 980,000.00 Rp 734,637.04
215.000 liter Air Rp 500.00
Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00
Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00
Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00
Rp 3,987.50
0.083 OH Mandor Rp 170,000.00
Rp 14,025.00
JUMLAH Rp 2,219,227.68
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,219,227.68

1 m3 Beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm, w/c = 0.72 SNI : 7394:2008
299.000 kg PC Rp 2,946.00
Rp 880,854.00
0.571 m3 Pasir beton Rp 600,000.00
Rp 342,428.57
BAHAN
0.753 m3 Koral beton 2/3 Rp 980,000.00
Rp 738,266.67
215.000 liter Air Rp 500.00
Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00
Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00
Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00
Rp 3,987.50
0.083 OH Mandor Rp 170,000.00
Rp 14,025.00
JUMLAH Rp 2,278,186.74
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,278,186.74

1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm w/c =
SNI : 7394:2008
0.87
230.000 kg PC Rp 2,946.00 Rp 677,580.00
0.638 m3 Pasir beton Rp 600,000.00 Rp 382,714.29
BAHAN
0.761 m3 Koral beton 2/3 Rp 980,000.00 Rp 745,525.93
200.000 liter Air Rp 500.00 Rp 100,000.00
1.200 OH Pekerja Rp 100,000.00
Rp 120,000.00
0.200 OH Tukang batu Rp 95,000.00
Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00
Rp 2,900.00
0.060 OH Mandor Rp 170,000.00
Rp 10,200.00
JUMLAH Rp 2,057,920.21
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,057,920.21

1 m3 Beton mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 SNI : 7394:2008
326.000 kg PC Rp 2,946.00 Rp 960,396.00
0.543 m3 Pasir beton Rp 600,000.00 Rp 325,714.29
BAHAN
0.762 m3 Koral beton 2/3 Rp 980,000.00 Rp 746,977.78
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00 Rp 4,060.00
0.083 OH Mandor Rp 170,000.00 Rp 14,110.00
JUMLAH Rp 2,349,883.06
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,349,883.06
1 m3 Beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61 SNI : 7394:2008
352.000 kg PC Rp 2,946.00 Rp 1,036,992.00
0.522 m3 Pasir beton Rp 600,000.00 Rp 313,285.71
BAHAN
0.764 m3 Koral beton 2/3 Rp 980,000.00 Rp 748,429.63
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00
Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00
Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00
Rp 4,060.00
0.083 OH Mandor Rp 170,000.00
Rp 14,110.00
JUMLAHRp 2,415,502.34
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,415,502.34

1 m3 Beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 SNI : 7394:2008
371.000 kg PC Rp 2,946.00 Rp 1,092,966.00
0.499 m3 Pasir beton Rp 600,000.00 Rp 299,142.86
BAHAN
0.776 m3 Koral beton 2/3 Rp 980,000.00 Rp 760,044.44
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00
Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00
Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00
Rp 4,060.00
0.083 OH Mandor Rp 170,000.00
Rp 14,110.00
JUMLAHRp 2,468,948.30
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,468,948.30

1 m3 Beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 SNI : 7394:2008
384.000 kg PC Rp 2,946.00 Rp 1,131,264.00
0.494 m3 Pasir beton Rp 600,000.00 Rp 296,571.43
BAHAN
0.770 m3 Koral beton 2/3 Rp 980,000.00 Rp 754,237.04
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00 Rp 4,060.00
0.083 OH Mandor Rp 170,000.00 Rp 14,110.00
JUMLAH Rp 2,498,867.47
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,498,867.47

1 m3 Beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm, w/c = 0,53 SNI : 7394:2008
406.000 kg PC Rp 2,946.00 Rp 1,196,076.00
0.489 m3 Pasir beton Rp 600,000.00 Rp 293,142.86
BAHAN
0.760 m3 Koral beton 2/3 Rp 980,000.00 Rp 744,800.00
215.000 liter Air Rp 500.00 Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00 Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00 Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00 Rp 4,060.00
0.083 OH Mandor Rp 170,000.00 Rp 14,110.00
JUMLAH Rp 2,550,813.86
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,550,813.86

1 m3 Beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 SNI : 7394:2008
413.000 kg PC Rp 2,946.00 Rp 1,216,698.00
0.486 m3 Pasir beton Rp 600,000.00 Rp 291,857.14
BAHAN
0.756 m3 Koral beton 2/3 Rp 980,000.00
Rp 741,170.37
215.000 liter Air Rp 500.00
Rp 107,500.00
1.650 OH Pekerja Rp 100,000.00
Rp 165,000.00
0.275 OH Tukang batu Rp 95,000.00
Rp 26,125.00
TENAGA
0.028 OH Kepala Tukang Rp 145,000.00
Rp 4,060.00
0.083 OH Mandor Rp 170,000.00
Rp 14,110.00
JUMLAHRp 2,566,520.51
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,566,520.51
1 m3 Beton mutu f'c = 28,8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0,49 SNI : 7394:2008
439.000 kg PC Rp 2,946.00 Rp 1,293,294.00
0.479 m3 Pasir beton Rp 600,000.00 Rp 287,142.86
BAHAN
0.745 m3 Koral beton 2/3 Rp 980,000.00 Rp 730,281.48
215.000 liter Air Rp 500.00
Rp 107,500.00
2.100 OH Pekerja Rp 100,000.00
Rp 210,000.00
0.350 OH Tukang batu Rp 95,000.00
Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00
Rp 5,075.00
0.105 OH Mandor Rp 170,000.00
Rp 17,850.00
JUMLAHRp 2,684,393.34
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,684,393.34

1 m3 Beton mutu f'c = 31,2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0,48 SNI : 7394:2008
448.000 kg PC Rp 2,946.00 Rp 1,319,808.00
0.476 m3 Pasir beton Rp 600,000.00 Rp 285,857.14
BAHAN
0.741 m3 Koral beton 2/3 Rp 980,000.00 Rp 725,925.93
215.000 liter Air Rp 500.00
Rp 107,500.00
2.100 OH Pekerja Rp 100,000.00
Rp 210,000.00
0.350 OH Tukang batu Rp 95,000.00
Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00
Rp 5,075.00
0.105 OH Mandor Rp 170,000.00
Rp 17,850.00
JUMLAHRp 2,705,266.07
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,705,266.07

1 m3 Beton kedap air dengan strorox - 100 SNI : 7394:2008


400.000 kg PC Rp 2,946.00 Rp 1,178,400.00
0.480 m3 Pasir beton Rp 600,000.00 Rp 288,000.00
BAHAN 0.800 m3 Koral beton 2/3 Rp 980,000.00 Rp 784,000.00
1.200 kg Strorox - 100 Rp 100,000.00 Rp 120,000.00
210.000 liter Air Rp 500.00 Rp 105,000.00
2.100 OH Pekerja Rp 100,000.00
Rp 210,000.00
0.350 OH Tukang batu Rp 95,000.00
Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00
Rp 5,075.00
0.105 OH Mandor Rp 170,000.00
Rp 17,850.00
JUMLAHRp 2,741,575.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,741,575.00

1 m' PVC Waterstop lebar 150 mm SNI : 7394:2008


BAHAN 1.050 m Waterstop lbr 150 mm Rp 95,000.00
Rp 99,750.00
0.060 OH Pekerja Rp 100,000.00
Rp 6,000.00
0.030 OH Tukang batu Rp 95,000.00
Rp 2,850.00
TENAGA
0.003 OH Kepala Tukang Rp 145,000.00
Rp 435.00
0.003 OH Mandor Rp 170,000.00
Rp 510.00
JUMLAHRp 109,545.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 109,545.00

1 m' PVC Waterstop lebar 200 mm SNI : 7394:2008


BAHAN 1.050 m Waterstop lbr 200 mm Rp 100,000.00 Rp 105,000.00
0.070 OH Pekerja Rp 100,000.00 Rp 7,000.00
0.035 OH Tukang batu Rp 95,000.00 Rp 3,325.00
TENAGA
0.004 OH Kepala Tukang Rp 145,000.00 Rp 507.50
0.004 OH Mandor Rp 170,000.00 Rp 595.00
JUMLAH Rp 116,427.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 116,427.50

1 m' PVC Waterstop lebar 230 - 320 mm SNI : 7394:2008


BAHAN 1.050 m Waterstop Rp 105,000.00 Rp 110,250.00
0.080 OH Pekerja Rp 100,000.00 Rp 8,000.00
0.040 OH Tukang batu Rp 95,000.00 Rp 3,800.00
TENAGA
TENAGA
0.004 OH Kepala Tukang Rp 145,000.00 Rp 580.00
0.004 OH Mandor Rp 170,000.00 Rp 680.00
JUMLAH Rp 123,310.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 123,310.00

Pembesian 10 kg dengan besi polos SNI : 7394:2008


10.500 kg Besi beton polos Rp 25,000.00 Rp 262,500.00
BAHAN
0.150 kg Kawat beton Rp 30,000.00 Rp 4,500.00
0.070 OH Pekerja Rp 100,000.00 Rp 7,000.00
0.070 OH Tukang besi Rp 95,000.00 Rp 6,650.00
TENAGA
0.007 OH Kepala Tukang Rp 145,000.00 Rp 1,015.00
0.004 OH Mandor Rp 170,000.00 Rp 680.00
JUMLAH Rp 282,345.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 282,345.00
1 kg -------------------> Rp 28,234.50

Pembesian 10 kg dengan besi ulir SNI : 7394:2008


10.500 kg Besi beton ulir Rp 30,000.00 Rp 315,000.00
BAHAN
0.150 kg Kawat beton Rp 30,000.00 Rp 4,500.00
0.070 OH Pekerja Rp 100,000.00 Rp 7,000.00
0.070 OH Tukang besi Rp 95,000.00 Rp 6,650.00
TENAGA
0.007 OH Kepala Tukang Rp 145,000.00 Rp 1,015.00
0.004 OH Mandor Rp 170,000.00 Rp 680.00
JUMLAH Rp 334,845.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 334,845.00
1 kg -------------------> Rp 33,484.50

Pembesian 10 kg kabel presstressed polos / strands SNI : 7394:2008


10.500 kg Besi beton polos Rp 25,000.00 Rp 262,500.00
BAHAN
0.100 kg Kawat beton Rp 30,000.00 Rp 3,000.00
0.050 OH Pekerja Rp 100,000.00 Rp 5,000.00
0.050 OH Tukang besi Rp 95,000.00 Rp 4,750.00
TENAGA
0.005 OH Kepala Tukang Rp 145,000.00 Rp 725.00
0.003 OH Mandor Rp 170,000.00 Rp 425.00
JUMLAH Rp 276,400.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 276,400.00
1 kg -------------------> Rp 27,640.00

Pembesian 10 kg Jaring kawat baja/wire mesh SNI : 7394:2008


10.000 kg Jaring kawat baja di las Rp 65,000.00 Rp 650,000.00
BAHAN
0.050 kg Kawat beton Rp 30,000.00 Rp 1,500.00
0.025 OH Pekerja Rp 100,000.00 Rp 2,500.00
0.025 OH Tukang besi Rp 95,000.00 Rp 2,375.00
TENAGA
0.002 OH Kepala Tukang Rp 145,000.00 Rp 253.75
0.001 OH Mandor Rp 170,000.00 Rp 170.00
JUMLAH Rp 656,798.75
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 656,798.75
1 kg -------------------> Rp 65,679.88
1 m2 bekisting untuk pondasi SNI : 7394:2008
0.040 m3 Kayu kelas III Rp 2,000,000.00 Rp 80,000.00
BAHAN 0.300 kg Paku biasa 2"-5" Rp 32,000.00 Rp 9,600.00
0.100 liter Minyak bekisting Rp 5,000.00 Rp 500.00
0.520 OH Pekerja Rp 100,000.00
Rp 52,000.00
0.260 OH Tukang kayu Rp 95,000.00
Rp 24,700.00
TENAGA
0.026 OH Kepala Tukang Rp 145,000.00
Rp 3,770.00
0.026 OH Mandor Rp 170,000.00
Rp 4,420.00
JUMLAH Rp 174,990.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 174,990.00

1 m2 bekisting untuk sloof SNI : 7394:2008


0.045 m3 Kayu kelas III Rp 2,000,000.00 Rp 90,000.00
BAHAN 0.300 kg Paku biasa 2"-5" Rp 32,000.00 Rp 9,600.00
0.100 liter Minyak bekisting Rp 5,000.00 Rp 500.00
0.520 OH Pekerja Rp 100,000.00 Rp 52,000.00
0.260 OH Tukang kayu Rp 95,000.00
Rp 24,700.00
TENAGA
0.026 OH Kepala Tukang Rp 145,000.00
Rp 3,770.00
0.026 OH Mandor Rp 170,000.00
Rp 4,420.00
JUMLAH Rp 184,990.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 184,990.00

1 m2 bekisting untuk kolom SNI : 7394:2008


0.040 m3 Kayu kelas III Rp 2,000,000.00 Rp 80,000.00
0.400 kg Paku biasa 2"-5" Rp 32,000.00 Rp 12,800.00
0.200 liter Minyak bekisting Rp 5,000.00 Rp 1,000.00
BAHAN
0.015 m3 Balok kayu kelas II Rp 3,000,000.00 Rp 45,000.00
0.350 lbr Plywood 9 mm Rp 200,000.00 Rp 70,000.00
2.000 btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 190,000.00
0.660 OH Pekerja Rp 100,000.00 Rp 66,000.00
0.330 OH Tukang kayu Rp 95,000.00
Rp 31,350.00
TENAGA
0.033 OH Kepala Tukang Rp 145,000.00
Rp 4,785.00
0.033 OH Mandor Rp 170,000.00
Rp 5,610.00
JUMLAH Rp 506,545.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 506,545.00

1 m2 bekisting untuk balok SNI : 7394:2008


0.040 m3 Kayu kelas III Rp 2,000,000.00 Rp 80,000.00
0.400 kg Paku biasa 2"-5" Rp 32,000.00 Rp 12,800.00
0.200 liter Minyak bekisting Rp 5,000.00 Rp 1,000.00
BAHAN
0.018 m3 Balok kayu kelas II Rp 3,000,000.00 Rp 54,000.00
0.350 lbr Plywood 9 mm Rp 200,000.00 Rp 70,000.00
2.000 btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 190,000.00
0.660 OH Pekerja Rp 100,000.00 Rp 66,000.00
0.330 OH Tukang kayu Rp 95,000.00
Rp 31,350.00
TENAGA
0.033 OH Kepala Tukang Rp 145,000.00
Rp 4,785.00
0.033 OH Mandor Rp 170,000.00
Rp 5,610.00
JUMLAH Rp 515,545.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 515,545.00

1 m2 bekisting untuk plat lantai SNI : 7394:2008


0.040 m3 Kayu kelas III Rp 2,000,000.00 Rp 80,000.00
0.400 kg Paku biasa 2"-5" Rp 32,000.00 Rp 12,800.00
0.200 liter Minyak bekisting Rp 5,000.00 Rp 1,000.00
BAHAN
0.015 m3 Balok kayu kelas II Rp 3,000,000.00 Rp 45,000.00
0.350 lbr Plywood 9 mm Rp 200,000.00 Rp 70,000.00
6.000 btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 570,000.00
0.660 OH Pekerja Rp 100,000.00 Rp 66,000.00
0.330 OH Tukang kayu Rp 95,000.00 Rp 31,350.00
TENAGA
0.033 OH Kepala Tukang Rp 145,000.00 Rp 4,785.00
TENAGA

0.033 OH Mandor Rp 170,000.00 Rp 5,610.00


JUMLAH Rp 886,545.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 886,545.00
1 m2 bekisting untuk tangga SNI : 7394:2008
0.030 m3 Kayu kelas III Rp 2,000,000.00 Rp 60,000.00
0.400 kg Paku biasa 2"-5" Rp 32,000.00 Rp 12,800.00
0.150 liter Minyak bekisting Rp 5,000.00 Rp 750.00
BAHAN
0.015 m3 Balok kayu kelas II Rp 3,000,000.00 Rp 45,000.00
0.350 lbr Plywood 9 mm Rp 200,000.00 Rp 70,000.00
2.000 btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00 Rp 190,000.00
0.660 OH Pekerja Rp 100,000.00 Rp 66,000.00
0.330 OH Tukang kayu Rp 95,000.00 Rp 31,350.00
TENAGA
0.033 OH Kepala Tukang Rp 145,000.00 Rp 4,785.00
0.033 OH Mandor Rp 170,000.00 Rp 5,610.00
JUMLAH Rp 486,295.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 486,295.00

1 m2 bekisting jembatan untuk pengecoran beton SNI : 7394:2008


0.0264 m3 Kayu kelas III Rp 2,000,000.00 Rp 52,800.00
BAHAN 0.600 kg Paku biasa 2"-5" Rp 32,000.00
Rp 19,200.00
0.500 btg Dolken kayu Ф 8-10 / 400 cm Rp 95,000.00
Rp 47,500.00
0.150 OH Pekerja Rp 100,000.00
Rp 15,000.00
0.050 OH Tukang kayu Rp 95,000.00
Rp 4,750.00
TENAGA
0.005 OH Kepala Tukang Rp 145,000.00
Rp 725.00
0.008 OH Mandor Rp 170,000.00
Rp 1,360.00
JUMLAHRp 141,335.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 141,335.00

1 m1 Kolom praktis beton bertulang (12 x 12) cm SNI : 7394:2008


0.002 m3 Kayu kelas III Rp 2,000,000.00 Rp 4,000.00
0.010 kg Paku biasa 2"-5" Rp 32,000.00 Rp 320.00
0.000 kg Besi beton Rp 25,000.00 Rp -
BAHAN 0.045 kg Kawat beton Rp 30,000.00 Rp 1,350.00
4.000 kg PC Rp 2,946.00Rp 11,784.00
0.006 m3 Pasir beton Rp 600,000.00Rp 3,600.00
0.009 m3 Koral beton 2/3 Rp 980,000.00Rp 8,820.00
0.180 OH Pekerja Rp 100,000.00Rp 18,000.00
0.020 OH Tukang batu Rp 95,000.00Rp 1,900.00
0.020 OH Tukang kayu Rp 95,000.00Rp 1,900.00
TENAGA
0.020 OH Tukang besi Rp 95,000.00Rp 1,900.00
0.006 OH Kepala Tukang Rp 145,000.00Rp 870.00
0.009 OH Mandor Rp 170,000.00Rp 1,530.00
JUMLAH Rp 55,974.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 55,974.00
1 m3 Rp 4,625,950.41

1 m' Balok latei beton bertulang, (10 x 15) cm SNI : 7394:2008


0.003 m3 Kayu kelas III Rp 2,000,000.00 Rp 6,000.00
0.020 kg Paku biasa 2"-5" Rp 32,000.00 Rp 640.00
0.000 kg Besi beton Rp 25,000.00 Rp -
BAHAN 0.050 kg Kawat beton Rp 30,000.00 Rp 1,500.00
5.500 kg PC Rp 2,946.00 Rp 16,203.00
0.009 m3 Pasir beton Rp 600,000.00 Rp 5,400.00
0.015 m3 Koral beton 2/3 Rp 980,000.00 Rp 14,700.00
0.297 OH Pekerja Rp 100,000.00 Rp 29,700.00
0.033 OH Tukang batu Rp 95,000.00 Rp 3,135.00
0.033 OH Tukang kayu Rp 95,000.00 Rp 3,135.00
TENAGA
0.033 OH Tukang besi Rp 95,000.00 Rp 3,135.00
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 87,548.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 87,548.00
1 m3 Rp 3,647,833.33
1 m' Ring gunung beton bertulang, (12 x 15) cm SNI : 7394:2008
0.003 m3 Kayu kelas III Rp 2,000,000.00 Rp 6,000.00
0.020 kg Paku biasa 2"-5" Rp 32,000.00 Rp 640.00
0.000 kg Besi beton Rp 25,000.00 Rp -
BAHAN 0.050 kg Kawat beton Rp 30,000.00 Rp 1,500.00
5.500 kg PC Rp 2,946.00 Rp 16,203.00
0.009 m3 Pasir beton Rp 600,000.00 Rp 5,400.00
0.015 m3 Koral beton 2/3 Rp 980,000.00 Rp 14,700.00
0.297 OH Pekerja Rp 100,000.00 Rp 29,700.00
0.033 OH Tukang batu Rp 95,000.00 Rp 3,135.00
0.033 OH Tukang kayu Rp 95,000.00 Rp 3,135.00
TENAGA
0.033 OH Tukang besi Rp 95,000.00 Rp 3,135.00
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.015 OH Mandor Rp 170,000.00 Rp 2,550.00
JUMLAH Rp 87,548.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 87,548.00
1 m3 Rp 3,647,833.33

1 m3 Membongkar bekisting SNI : 7394:2008


TENAGA 4.000 OH Pekerja Rp 100,000.00 Rp 400,000.00
JUMLAH Rp 400,000.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 400,000.00

1 Titik Poor Plat Tul. 2 Lapis - 15 cm tebal (cm) 25


Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 80 80

0.16 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) Rp 2,468,948.30 395,031.73
cm, w/c=0,58
10.98 kg besi Ø 12 Rp 28,234.50 309,909.59
10.98 kg besi Ø 12 Rp 28,234.50 309,909.59
1.00 m2 Bekisting untuk Pondasi Rp 174,990.00 174,990.00
0.04 m3 Membongkar bekisting Rp 400,000.00 16,000.00
JUMLAH 1,205,840.90
DIBULATKAN 1,205,840.00

1 m3 Sloof beton ukuran (cm)


Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 15 20

1.00 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) Rp 2,468,948.30 2,468,948.30
cm, w/c=0,58
118.76 kg besi Ø 12 Rp 28,234.50 3,353,174.94
41.24 kg besi Ø 10 Rp 28,234.50 1,164,296.85
27.72 kg besi Ø 6 Rp 28,234.50 782,797.52
3.33 m2 Bekisting untuk sloof Rp 184,990.00 616,633.33
0.15 m3 Membongkar bekisting Rp 400,000.00 60,000.00
JUMLAH 8,445,850.94
DIBULATKAN 8,445,850.00

1 m3 Kolom beton ukuran (cm)


Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 20 15

1.00 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) Rp 2,468,948.30 2,468,948.30
cm, w/c=0,58
118.76 kg besi Ø 12 Rp 28,234.50 3,353,174.94
41.24 kg besi Ø 10 Rp 28,234.50 1,164,296.85
27.72 kg besi Ø 6 Rp 28,234.50 782,797.52
3.41 m2 Bekisting untuk Kolom Rp 506,545.00 1,726,474.21
0.32 m3 Membongkar bekisting Rp 400,000.00 129,516.67
JUMLAH 9,625,208.49
DIBULATKAN 9,625,208.00
1 m3 Ringbalk beton ukuran (cm)
Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 15 20

1.00 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) Rp 2,468,948.30 2,468,948.30
cm, w/c=0,58
118.76 kg besi Ø 12 Rp 28,234.50 3,353,174.94
41.24 kg besi Ø 10 Rp 28,234.50 1,164,296.85
27.72 kg besi Ø 6 Rp 28,234.50 782,797.52
1.35 m2 Bekisting untuk Balok Rp 515,545.00 695,985.75
0.13 m3 Membongkar bekisting Rp 400,000.00 52,920.00
JUMLAH 8,518,123.36
DIBULATKAN 8,518,123.00

1 m3 Plat beton Tul. 2 Lapis - 15 cm tebal (cm) 15


Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 300.00 2.22

1.00 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) Rp 2,468,948.30 2,468,948.30
cm, w/c=0,58
60.93 kg besi Ø 10 Rp 28,234.50 1,720,210.87
57.91 kg besi Ø 10 Rp 28,234.50 1,635,007.10
3.33 m2 Bekisting untuk Plat lantai Rp 886,545.00 2,955,150.00
0.55 m3 Membongkar bekisting Rp 400,000.00 220,000.00
JUMLAH 8,999,316.27
DIBULATKAN 8,999,316.00

1 m3 Plat beton Tul. 1 Lapis - 15 cm tebal (cm) 10


Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 40.00 25.00

1.00 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) Rp 2,468,948.30 2,468,948.30
cm, w/c=0,58
29.70 kg besi Ø 8 Rp 28,234.50 838,460.89
31.64 kg besi Ø 8 Rp 28,234.50 893,288.48
5.00 m2 Bekisting untuk Plat lantai Rp 886,545.00 4,432,725.00
0.83 m3 Membongkar bekisting Rp 400,000.00 330,000.00
JUMLAH 8,963,422.67
DIBULATKAN 8,963,422.00

1 m3 Kolom beton ukuran (cm)


Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 15 15

1.00 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) Rp 2,468,948.30 2,468,948.30
cm, w/c=0,58
158.23 kg besi Ø 12 Rp 28,234.50 4,467,556.77
- kg besi Ø 0 Rp 28,234.50 -
30.33 kg besi Ø 6 Rp 28,234.50 856,388.51
3.41 m2 Bekisting untuk Kolom Rp 506,545.00 1,726,474.21
0.32 m3 Membongkar bekisting Rp 400,000.00 129,516.67
JUMLAH 9,648,884.46
DIBULATKAN 9,648,884.00

1 m3 Kolom beton ukuran (cm)


Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 15 15

1.00 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) Rp 2,468,948.30 2,468,948.30
cm, w/c=0,58
109.88 kg besi Ø 10 Rp 28,234.50 3,102,469.98
- kg besi Ø 0 Rp 28,234.50 -
53.92 kg besi Ø 8 Rp 28,234.50 1,522,468.46
3.41 m2 Bekisting untuk Kolom Rp 506,545.00 1,726,474.21
0.32 m3 Membongkar bekisting Rp 400,000.00 129,516.67
JUMLAH 8,949,877.62
DIBULATKAN 8,949,877.00
1 m3 Sloof beton ukuran (cm)
Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 15 15

1.00 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) Rp 2,468,948.30 2,468,948.30
cm, w/c=0,58
158.23 kg besi Ø 12 Rp 28,234.50 4,467,556.77
- kg besi Ø 0 Rp 28,234.50 -
53.92 kg besi Ø 8 Rp 28,234.50 1,522,468.46
3.33 m2 Bekisting untuk sloof Rp 184,990.00 616,633.33
0.15 m3 Membongkar bekisting Rp 400,000.00 60,000.00
JUMLAH 9,135,606.87
DIBULATKAN 9,135,606.00

1 m3 Ringbalk beton ukuran (cm)


Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c=0,58 15 15

1.00 m3 Beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) Rp 2,468,948.30 2,468,948.30
cm, w/c=0,58
158.23 kg besi Ø 12 Rp 28,234.50 4,467,556.77
- kg besi Ø 0 Rp 28,234.50 -
53.92 kg besi Ø 8 Rp 28,234.50 1,522,468.46
1.74 m2 Bekisting untuk Balok Rp 515,545.00 897,907.54
0.17 m3 Membongkar bekisting Rp 400,000.00 68,273.33
JUMLAH 9,425,154.41
DIBULATKAN 9,425,154.00
PEKERJAAN KAYU

1 m3 Membuat dan memasang kusen pintu/jendela kayu kelas I SNI : 3434:2008


1.100 m3 Balok kayu kls I Rp 5,200,000.00 Rp 5,720,000.00
BAHAN 1.250 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 40,000.00
1.000 Kg Lem kayu Rp 55,000.00 Rp 55,000.00
7.000 OH Pekerja Rp 100,000.00 Rp 700,000.00
21.000 OH Tukang kayu Rp 95,000.00 Rp 1,995,000.00
TENAGA
2.100 OH Kepala Tukang Rp 145,000.00 Rp 304,500.00
0.350 OH Mandor Rp 170,000.00 Rp 59,500.00
JUMLAH Rp 8,874,000.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 8,874,000.00

1 m3 Membuat dan memasang kusen pintu/jendela kayu kls II SNI : 3434:2008


1.200 m3 Balok kayu kls II Rp 3,000,000.00 Rp 3,600,000.00
BAHAN 1.250 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 40,000.00
1.000 Kg Lem kayu Rp 55,000.00 Rp 55,000.00
6.000 OH Pekerja Rp 100,000.00 Rp 600,000.00
18.000 OH Tukang kayu Rp 95,000.00 Rp 1,710,000.00
TENAGA
1.800 OH Kepala Tukang Rp 145,000.00 Rp 261,000.00
0.300 OH Mandor Rp 170,000.00 Rp 51,000.00
JUMLAH Rp 6,317,000.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 6,317,000.00

1 m3 Memasang kusen pintu/jendela lama SNI : 3434:2008


Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baru
0.417 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 13,333.33
BAHAN
0.333 Kg Lem kayu Rp 55,000.00 Rp 18,333.33
2.000 OH Pekerja Rp 100,000.00 Rp 200,000.00
6.000 OH Tukang kayu Rp 95,000.00 Rp 570,000.00
TENAGA
0.600 OH Kepala Tukang Rp 145,000.00 Rp 87,000.00
0.100 OH Mandor Rp 170,000.00 Rp 17,000.00
JUMLAH Rp 905,666.67
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 905,666.67

1 m2 Membuat dan memasang pintu klamp standar, kayu kelas II SNI : 3434:2008
0.040 m3 Papan kayu kls II Rp 3,000,000.00 Rp 120,000.00
BAHAN
0.050 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 1,600.00
0.350 OH Pekerja Rp 100,000.00 Rp 35,000.00
1.050 OH Tukang kayu Rp 95,000.00 Rp 99,750.00
TENAGA
0.105 OH Kepala Tukang Rp 145,000.00 Rp 15,225.00
0.018 OH Mandor Rp 170,000.00 Rp 3,060.00
JUMLAH Rp 274,635.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 274,635.00

1 m2 Membuat dan memasang pintu klamp sederhana, kayu kelas III


SNI : 3434:2008
untuk gudang sementara
0.040 m3 Papan kayu kls III Rp 2,000,000.00 Rp 80,000.00
BAHAN
0.050 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 1,600.00
0.350 OH Pekerja Rp 100,000.00 Rp 35,000.00
1.050 OH Tukang kayu Rp 95,000.00 Rp 99,750.00
TENAGA
0.105 OH Kepala Tukang Rp 145,000.00 Rp 15,225.00
0.018 OH Mandor Rp 170,000.00 Rp 3,060.00
JUMLAH Rp 234,635.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 234,635.00

1 m2 Membuat dan memasang daun pintu panel kayu kelas I SNI : 3434:2008
0.040 m3 Papan kayu kls I Rp 5,200,000.00 Rp 208,000.00
BAHAN
0.500 Kg Lem kayu Rp 55,000.00 Rp 27,500.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
3.000 OH Tukang kayu Rp 95,000.00 Rp 285,000.00
TENAGA
0.300 OH Kepala Tukang Rp 145,000.00 Rp 43,500.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 672,500.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 672,500.00
1 m2 Membuat dan memasang daun pintu panel kayu kelas II SNI : 3434:2008
0.040 m3 Papan kayu kls II Rp 3,000,000.00 Rp 120,000.00
BAHAN
0.500 Kg Lem kayu Rp 55,000.00 Rp 27,500.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
3.000 OH Tukang kayu Rp 95,000.00 Rp 285,000.00
TENAGA
0.300 OH Kepala Tukang Rp 145,000.00 Rp 43,500.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 584,500.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 584,500.00

1 m2 Memasang daun pintu panel lama SNI : 3434:2008


Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baru
BAHAN 0.167 Kg Lem kayu Rp 55,000.00 Rp 9,166.67
0.333 OH Pekerja Rp 100,000.00 Rp 33,333.33
1.000 OH Tukang kayu Rp 95,000.00 Rp 95,000.00
TENAGA
0.100 OH Kepala Tukang Rp 145,000.00 Rp 14,500.00
0.017 OH Mandor Rp 170,000.00 Rp 2,833.33
JUMLAH Rp 154,833.33
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 154,833.33

1 m2 Membuat dan memasang daun pintu/jendela kaca kayu kelas I SNI : 3434:2008
0.024 m3 Papan kayu kls I Rp 5,200,000.00 Rp 124,800.00
BAHAN
0.300 Kg Lem kayu Rp 55,000.00 Rp 16,500.00
0.800 OH Pekerja Rp 100,000.00 Rp 80,000.00
2.400 OH Tukang kayu Rp 95,000.00 Rp 228,000.00
TENAGA
0.240 OH Kepala Tukang Rp 145,000.00 Rp 34,800.00
0.040 OH Mandor Rp 170,000.00 Rp 6,800.00
JUMLAH Rp 490,900.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 490,900.00

1 m2 Membuat dan memasang daun pintu/jendela kaca kayu kelas II SNI : 3434:2008
0.024 m3 Papan kayu kls II Rp 3,000,000.00 Rp 72,000.00
BAHAN
0.300 Kg Lem kayu Rp 55,000.00 Rp 16,500.00
0.800 OH Pekerja Rp 100,000.00 Rp 80,000.00
2.400 OH Tukang kayu Rp 95,000.00 Rp 228,000.00
TENAGA
0.240 OH Kepala Tukang Rp 145,000.00 Rp 34,800.00
0.040 OH Mandor Rp 170,000.00 Rp 6,800.00
JUMLAH Rp 438,100.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 438,100.00

1 m2 Memasang daun pintu/jendela kaca lama SNI : 3434:2008


Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baru
BAHAN 0.100 Kg Lem kayu Rp 55,000.00 Rp 5,500.00
0.267 OH Pekerja Rp 100,000.00 Rp 26,666.67
0.800 OH Tukang kayu Rp 95,000.00 Rp 76,000.00
TENAGA
0.080 OH Kepala Tukang Rp 145,000.00 Rp 11,600.00
0.013 OH Mandor Rp 170,000.00 Rp 2,266.67
JUMLAH Rp 122,033.33
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 122,033.33

1 m2 Membuat dan memasang daun pintu dan jendela jalusi kayu kelas I SNI : 3434:2008

0.064 m3 Papan kayu kls I Rp 5,200,000.00 Rp 332,800.00


BAHAN
0.500 Kg Lem kayu Rp 55,000.00 Rp 27,500.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
3.000 OH Tukang kayu Rp 95,000.00 Rp 285,000.00
TENAGA
0.300 OH Kepala Tukang Rp 145,000.00 Rp 43,500.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 797,300.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 797,300.00
1 m2 Membuat dan memasang daun pintu dan jendela jalusi kayu kelas II SNI : 3434:2008

0.040 m3 Papan kayu kls II Rp 3,000,000.00 Rp 120,000.00


BAHAN
0.500 Kg Lem kayu Rp 55,000.00 Rp 27,500.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
3.000 OH Tukang kayu Rp 95,000.00 Rp 285,000.00
TENAGA
0.300 OH Kepala Tukang Rp 145,000.00 Rp 43,500.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 584,500.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 584,500.00

1 m2 Membuat dan memasang daun pintu lapis (plywood) rangkap,


SNI : 3434:2008
rangka tertutup, kayu kls II (lebar s/d 90 cm)
0.025 m3 Papan kayu kls II Rp 3,000,000.00 Rp 75,000.00
0.030 kg Paku biasa 0.5"-1" Rp 35,000.00 Rp 1,050.00
BAHAN
0.500 kg Lem kayu Rp 55,000.00 Rp 27,500.00
1.000 lbr Plywood 3 mm Rp 85,000.00 Rp 85,000.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
2.100 OH Tukang kayu Rp 95,000.00 Rp 199,500.00
TENAGA
0.210 OH Kepala Tukang Rp 145,000.00 Rp 30,450.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 494,450.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 494,450.00

1 m2 Membuat dan memasang daun pintu plywood rangkap, rangka


SNI : 3434:2008
ekspose, kayu kls II
0.0256 m3 Papan kayu kls II Rp 3,000,000.00 Rp 76,800.00
0.030 kg Paku biasa 0.5"-1" Rp 35,000.00 Rp 1,050.00
BAHAN
0.500 kg Lem kayu Rp 55,000.00 Rp 27,500.00
1.000 lbr Plywood 3 mm Rp 85,000.00 Rp 85,000.00
0.800 OH Pekerja Rp 100,000.00 Rp 80,000.00
2.400 OH Tukang kayu Rp 95,000.00 Rp 228,000.00
TENAGA
0.240 OH Kepala Tukang Rp 145,000.00 Rp 34,800.00
0.040 OH Mandor Rp 170,000.00 Rp 6,800.00
JUMLAH Rp 539,950.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 539,950.00

1 m2 Memasang jalusi kusen kayu Kls I SNI : 3434:2008


0.060 m3 Papan kayu kls I Rp 5,200,000.00 Rp 312,000.00
BAHAN
0.150 Kg Paku biasa 0.5"-1" Rp 35,000.00 Rp 5,250.00
0.670 OH Pekerja Rp 100,000.00 Rp 67,000.00
2.400 OH Tukang kayu Rp 95,000.00 Rp 228,000.00
TENAGA
0.200 OH Kepala Tukang Rp 145,000.00 Rp 29,000.00
0.335 OH Mandor Rp 170,000.00 Rp 56,950.00
JUMLAH Rp 698,200.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 698,200.00

1 m2 Memasang jalusi kusen kayu Kls II SNI : 3434:2008


0.060 m3 Papan kayu kls II Rp 3,000,000.00 Rp 180,000.00
BAHAN
0.150 Kg Paku biasa 0.5"-1" Rp 35,000.00 Rp 5,250.00
0.670 OH Pekerja Rp 100,000.00 Rp 67,000.00
2.400 OH Tukang kayu Rp 95,000.00 Rp 228,000.00
TENAGA
0.200 OH Kepala Tukang Rp 145,000.00 Rp 29,000.00
0.335 OH Mandor Rp 170,000.00 Rp 56,950.00
JUMLAH Rp 566,200.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 566,200.00

1 m2 Membuat dan memasang teakwood rangkap, rangka ekspose, kayu


SNI : 3434:2008
kls I
0.025 m3 Papan kayu kls I Rp 5,200,000.00 Rp 130,000.00
0.030 kg Paku biasa 0.5"-1" Rp 35,000.00 Rp 1,050.00
BAHAN
0.300 kg Lem kayu Rp 55,000.00 Rp 16,500.00
1.000 lbr Teakwood 5 mm Rp 120,000.00 Rp 120,000.00
0.800 OH Pekerja Rp 100,000.00 Rp 80,000.00
2.400 OH Tukang kayu Rp 95,000.00 Rp 228,000.00
TENAGA
0.240 OH Kepala Tukang Rp 145,000.00 Rp 34,800.00
0.040 OH Mandor Rp 170,000.00 Rp 6,800.00
JUMLAH Rp 617,150.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 617,150.00
1 m2 Membuat dan memasang teakwood rangkap lapis formika, rangka
SNI : 3434:2008
ekspose, kayu kls II
0.025 m3 Papan kayu kls II Rp 3,000,000.00 Rp 75,000.00
0.030 kg Paku biasa 0.5"-1" Rp 35,000.00 Rp 1,050.00
BAHAN 0.800 kg Lem kayu Rp 55,000.00 Rp 44,000.00
0.500 lbr Formika Rp 250,000.00 Rp 125,000.00
1.000 lbr Teakwood 5 mm Rp 120,000.00 Rp 120,000.00
0.850 OH Pekerja Rp 100,000.00 Rp 85,000.00
2.550 OH Tukang kayu Rp 95,000.00 Rp 242,250.00
TENAGA
0.255 OH Kepala Tukang Rp 145,000.00 Rp 36,975.00
0.043 OH Mandor Rp 170,000.00 Rp 7,225.00
JUMLAH Rp 736,500.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 736,500.00

1 m3 Memasang konstruksi kuda-kuda kayu konvensional, kayu kls I


SNI : 3434:2008
bentang 6 meter

1.100 m3 Balok kayu kls I Rp 5,200,000.00 Rp 5,720,000.00


BAHAN 5.600 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 179,200.00
15.000 Kg Besi strip Rp 45,000.00
Rp 675,000.00
4.000 OH Pekerja Rp 100,000.00
Rp 400,000.00
12.000 OH Tukang kayu Rp 95,000.00
Rp 1,140,000.00
TENAGA
1.200 OH Kepala Tukang Rp 145,000.00
Rp 174,000.00
0.200 OH Mandor Rp 170,000.00
Rp 34,000.00
JUMLAH
Rp 8,322,200.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 8,322,200.00

1 m3 Memasang konstruksi kuda-kuda ekspose, kayu kls I SNI : 3434:2008


1.100 m3 Balok kayu kls I Rp 5,200,000.00 Rp 5,720,000.00
BAHAN 5.600 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 179,200.00
15.000 Kg Besi strip Rp 45,000.00 Rp 675,000.00
6.700 OH Pekerja Rp 100,000.00 Rp 670,000.00
20.100 OH Tukang kayu Rp 95,000.00 Rp 1,909,500.00
TENAGA
2.010 OH Kepala Tukang Rp 145,000.00 Rp 291,450.00
0.335 OH Mandor Rp 170,000.00 Rp 56,950.00
JUMLAH Rp 9,502,100.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 9,502,100.00

1 m3 Memasang kuda-kuda lama SNI : 3434:2008


Pemasangan kuda-kuda lama dipakai koefisien 50% tenaga kerja
3.350 OH Pekerja Rp 100,000.00 Rp 335,000.00
10.050 OH Tukang kayu Rp 95,000.00 Rp 954,750.00
TENAGA
1.005 OH Kepala Tukang Rp 145,000.00 Rp 145,725.00
0.168 OH Mandor Rp 170,000.00 Rp 28,475.00
JUMLAH Rp 1,463,950.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,463,950.00

1 m3 Konstruksi Gording kayu kelas II SNI : 3434:2008


1.100 m3 Balok kayu kls II Rp 3,000,000.00 Rp 3,300,000.00
BAHAN 3.000 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 96,000.00
15.000 Kg Besi strip Rp 45,000.00 Rp 675,000.00
2.400 OH Pekerja Rp 100,000.00 Rp 240,000.00
7.200 OH Tukang kayu Rp 95,000.00 Rp 684,000.00
TENAGA
0.720 OH Kepala Tukang Rp 145,000.00 Rp 104,400.00
0.120 OH Mandor Rp 170,000.00 Rp 20,400.00
JUMLAH Rp 5,119,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 5,119,800.00

1 m3 Konstruksi Gording lama SNI : 3434:2008


3.000 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 96,000.00
BAHAN
15.000 Kg Besi strip Rp 45,000.00 Rp 675,000.00
2.400 OH Pekerja Rp 100,000.00 Rp 240,000.00
7.200 OH Tukang kayu Rp 95,000.00 Rp 684,000.00
TENAGA
0.720 OH Kepala Tukang Rp 145,000.00 Rp 104,400.00
0.120 OH Mandor Rp 170,000.00 Rp 20,400.00
JUMLAH Rp 1,819,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,819,800.00
1 m2 Rangka atap genteng keramik, kayu kls II SNI : 3434:2008
0.014 m3 Kaso-kaso (5/7), kayu kls II Rp 3,000,000.00 Rp 42,000.00
BAHAN 0.0036 m3 Reng (2/3), kayu kls II Rp 3,000,000.00 Rp 10,800.00
0.250 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 8,000.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.100 OH Tukang kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 82,600.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 82,600.00

1 m2 Rangka atap genteng keramik, kayu kls II dan III SNI : 3434:2008
0.014 m3 Kaso-kaso (5/7), kayu kls II Rp 3,000,000.00 Rp 42,000.00
BAHAN 0.0036 m3 Reng (2/3), kayu kls III Rp 2,000,000.00 Rp 7,200.00
0.250 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 8,000.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.100 OH Tukang kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 79,000.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 79,000.00

1 m2 Rangka atap genteng beton, kayu kls. II SNI : 3434:2008


0.014 m3 Kaso-kaso (5/7), kayu kls II Rp 3,000,000.00 Rp 42,000.00
BAHAN 0.0072 m3 Reng (3/4), kayu kls II Rp 3,000,000.00 Rp 21,600.00
0.250 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 8,000.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.100 OH Tukang kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 93,400.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 93,400.00

1 m2 Rangka atap genteng keramik, kayu lama SNI : 3434:2008


BAHAN 0.250 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 8,000.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.100 OH Tukang kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 29,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 29,800.00

1 m2 Rangka langit-langit, kayu kls II uk. (50x100) cm SNI : 3434:2008


0.0154 m3 Balok kayu kls II Rp 3,000,000.00 Rp 46,200.00
BAHAN
0.200 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 6,400.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.300 OH Tukang kayu Rp 95,000.00 Rp 28,500.00
TENAGA
0.030 OH Kepala Tukang Rp 145,000.00 Rp 4,350.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 113,200.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 113,200.00
1 m2 Rangka atap sirap, kayu kelas II SNI : 3434:2008
0.1650 m3 Balok kayu kls II Rp 3,000,000.00 Rp 495,000.00
BAHAN
0.200 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 6,400.00
0.120 OH Pekerja Rp 100,000.00 Rp 12,000.00
0.120 OH Tukang kayu Rp 95,000.00 Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00 Rp 1,740.00
0.006 OH Mandor Rp 170,000.00 Rp 1,020.00
JUMLAH Rp 527,560.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 527,560.00

1 m2 Rangka langit-langit, kayu kls II uk. (50x100) cm SNI : 3434:2008


0.0154 m3 Balok kayu kls II Rp 3,000,000.00 Rp 46,200.00
BAHAN
0.200 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 6,400.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.300 OH Tukang kayu Rp 95,000.00 Rp 28,500.00
TENAGA
0.030 OH Kepala Tukang Rp 145,000.00 Rp 4,350.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 113,200.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 113,200.00

1 m2 Rangka langit-langit, kayu kls II uk. (60x60) cm SNI : 3434:2008


0.0163 m3 Balok kayu kls II Rp 3,000,000.00 Rp 48,900.00
BAHAN
0.250 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 8,000.00
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.300 OH Tukang kayu Rp 95,000.00 Rp 28,500.00
TENAGA
0.030 OH Kepala Tukang Rp 145,000.00 Rp 4,350.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 122,500.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 122,500.00

1 m2 Rangka langit-langit, kayu kls II uk. (100x100) cm SNI : 2002


0.0120 m3 Balok kayu kls II Rp 3,000,000.00 Rp 36,000.00
BAHAN
0.100 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 3,200.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.250 OH Tukang kayu Rp 95,000.00 Rp 23,750.00
TENAGA
0.025 OH Kepala Tukang Rp 145,000.00 Rp 3,625.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 94,325.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 94,325.00

1 m2 Rangka langit-langit miring, kayu kls II uk. (100x100) cm SNI : 2002


0.0060 m3 Balok kayu kls II Rp 3,000,000.00 Rp 18,000.00
BAHAN
0.060 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 1,920.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.250 OH Tukang kayu Rp 95,000.00 Rp 23,750.00
TENAGA
0.025 OH Kepala Tukang Rp 145,000.00 Rp 3,625.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 75,045.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 75,045.00

1 m2 Rangka langit-langit, kayu lama uk. (100x100) cm SNI : 2002


0.100 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 3,200.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.250 OH Tukang kayu Rp 95,000.00 Rp 23,750.00
TENAGA
0.025 OH Kepala Tukang Rp 145,000.00 Rp 3,625.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 58,325.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 58,325.00

1 m1 Memasang Lisplank uk. (3x20) cm kayu kls II SNI : 3434:2008


0.0108 m3 Papan kayu kls II Rp 3,000,000.00 Rp 32,400.00
BAHAN
0.100 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 3,200.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.200 OH Tukang kayu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 68,350.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 68,350.00
1 m1 Memasang Lisplank uk. (3x30) cm kayu kls II SNI : 3434:2008
0.0110 m3 Papan kayu kls II Rp 3,000,000.00 Rp 33,000.00
BAHAN
0.100 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 3,200.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.200 OH Tukang kayu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 68,950.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 68,950.00

1 m2 Rangka dinding pemisah, kayu kls II uk. (60x120) cm SNI : 3434:2008


0.0280 m3 Balok kayu kls II Rp 3,000,000.00 Rp 84,000.00
BAHAN
0.150 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 4,800.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.450 OH Tukang kayu Rp 95,000.00 Rp 42,750.00
TENAGA
0.045 OH Kepala Tukang Rp 145,000.00 Rp 6,525.00
0.008 OH Mandor Rp 170,000.00 Rp 1,360.00
JUMLAH Rp 154,435.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 154,435.00

1 m2 Membuat dan memasang dinding pemisah teakwood rangkap,


SNI : 3434:2008
rangka, kayu kls II
0.028 m3 Balok kayu kls II Rp 3,000,000.00 Rp 84,000.00
0.150 kg Paku biasa 2" - 5" Rp 32,000.00 Rp 4,800.00
BAHAN
0.560 kg Lem kayu Rp 55,000.00 Rp 30,800.00
0.860 lbr Teakwood 3 mm Rp 100,000.00 Rp 86,000.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.450 OH Tukang kayu Rp 95,000.00 Rp 42,750.00
TENAGA
0.045 OH Kepala Tukang Rp 145,000.00 Rp 6,525.00
0.008 OH Mandor Rp 170,000.00 Rp 1,360.00
JUMLAH Rp 271,235.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 271,235.00
1 m2 Membuat dan memasang dinding pemisah Plywood rangkap,
SNI : 3434:2008
rangka, kayu kls II
0.028 m3 Balok kayu kls II Rp 3,000,000.00 Rp 84,000.00
0.150 kg Paku biasa 2" - 5" Rp 32,000.00 Rp 4,800.00
BAHAN
0.560 kg Lem kayu Rp 55,000.00 Rp 30,800.00
0.860 lbr Plywood 3 mm Rp 85,000.00 Rp 73,100.00
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.600 OH Tukang kayu Rp 95,000.00 Rp 57,000.00
TENAGA
0.060 OH Kepala Tukang Rp 145,000.00 Rp 8,700.00
0.010 OH Mandor Rp 170,000.00 Rp 1,700.00
JUMLAH Rp 280,100.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 280,100.00

1 m2 Membuat dan memasang dinding lambriziring dari papan kayu kls II SNI : 3434:2008

0.007 m3 Papan kayu kls II Rp 3,000,000.00 Rp 21,000.00


BAHAN 0.100 kg Paku biasa 2" - 5" Rp 32,000.00 Rp 3,200.00
0.150 kg Paku sekrup Rp 45,000.00 Rp 6,750.00
0.600 OH Pekerja Rp 100,000.00 Rp 60,000.00
1.800 OH Tukang kayu Rp 95,000.00 Rp 171,000.00
TENAGA
0.180 OH Kepala Tukang Rp 145,000.00 Rp 26,100.00
0.030 OH Mandor Rp 170,000.00 Rp 5,100.00
JUMLAH Rp 293,150.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 293,150.00

1 m2 Membuat dan memasang dinding lambriziring dari plywood uk.


SNI : 3434:2008
(120x140) cm
0.4000 lbr Plywood 3 mm Rp 85,000.00 Rp 34,000.00
BAHAN
0.050 Kg Paku biasa 0.5" - 1" Rp 35,000.00 Rp 1,750.00
0.025 OH Pekerja Rp 100,000.00 Rp 2,500.00
0.075 OH Tukang kayu Rp 95,000.00 Rp 7,125.00
TENAGA
0.008 OH Kepala Tukang Rp 145,000.00 Rp 1,160.00
0.001 OH Mandor Rp 170,000.00 Rp 170.00
JUMLAH Rp 46,705.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 46,705.00

1 m2 Membuat dan memasang dinding bilik bambu, rangka kayu kls II SNI : 3434:2008

0.014 m3 Balok kayu kls II Rp 3,000,000.00 Rp 42,000.00


0.012 kg Paku biasa 2" - 5" Rp 32,000.00 Rp 384.00
BAHAN
0.003 m3 List kayu 2/4 Rp 3,000,000.00 Rp 9,000.00
1.500 m2 Bilik bambu Rp 350,000.00 Rp 525,000.00
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.600 OH Tukang kayu Rp 95,000.00 Rp 57,000.00
TENAGA
0.060 OH Kepala Tukang Rp 145,000.00 Rp 8,700.00
0.010 OH Mandor Rp 170,000.00 Rp 1,700.00
JUMLAH Rp 663,784.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 663,784.00

1 m1 Memasang riuter uk. (2x15) cm kayu kls II SNI : 3434:2008


0.0030 m3 Papan kayu kls II Rp 3,000,000.00 Rp 9,000.00
BAHAN
0.050 Kg Paku biasa 2" - 5 " Rp 32,000.00 Rp 1,600.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.200 OH Tukang kayu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 43,350.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 43,350.00

1 m1 Memasang winvier uk. (2x10) cm kayu kls II SNI : 3434:2008


0.0020 m3 Papan kayu kls II Rp 3,000,000.00 Rp 6,000.00
BAHAN
0.050 Kg Paku biasa 2"- 5" Rp 32,000.00 Rp 1,600.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.200 OH Tukang kayu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 40,350.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 40,350.00
1 m2 Rangka langit-langit, kayu kls II uk. (120x120) cm SNI : 3434:2008 (edit)
0.0082 m3 Balok kayu kls II Rp 3,000,000.00 Rp 24,450.00
BAHAN
0.125 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 4,000.00
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.300 OH Tukang kayu Rp 95,000.00 Rp 28,500.00
TENAGA
0.030 OH Kepala Tukang Rp 145,000.00 Rp 4,350.00
0.075 OH Mandor Rp 170,000.00 Rp 12,750.00
JUMLAH Rp 94,050.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 94,050.00

1 m3 Konstruksi Gording kayu kelas II SNI : 3434:2008


1.100 m3 Balok kayu kls II Rp 3,000,000.00 Rp 3,300,000.00
BAHAN 3.000 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 96,000.00
0.000 Kg Besi strip Rp 45,000.00 Rp -
2.400 OH Pekerja Rp 100,000.00 Rp 240,000.00
7.200 OH Tukang kayu Rp 95,000.00 Rp 684,000.00
TENAGA
0.720 OH Kepala Tukang Rp 145,000.00 Rp 104,400.00
0.120 OH Mandor Rp 170,000.00 Rp 20,400.00
JUMLAH Rp 4,444,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 4,444,800.00

1 m3 Konstruksi balok nok kayu kelas II SNI : 3434:2008


1.100 m3 Balok kayu kls II Rp 3,000,000.00 Rp 3,300,000.00
BAHAN 3.000 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 96,000.00
0.000 Kg Besi strip Rp 45,000.00 Rp -
2.400 OH Pekerja Rp 100,000.00 Rp 240,000.00
7.200 OH Tukang kayu Rp 95,000.00 Rp 684,000.00
TENAGA
0.720 OH Kepala Tukang Rp 145,000.00 Rp 104,400.00
0.120 OH Mandor Rp 170,000.00 Rp 20,400.00
JUMLAH Rp 4,444,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 4,444,800.00

1 m3 Konstruksi balok skor kayu kelas I SNI : 3434:2008


1.100 m3 Balok kayu kls I Rp 5,200,000.00 Rp 5,720,000.00
BAHAN 3.000 Kg Paku biasa 2" - 5" Rp 32,000.00 Rp 96,000.00
0.000 Kg Besi strip Rp 45,000.00 Rp -
2.400 OH Pekerja Rp 100,000.00 Rp 240,000.00
7.200 OH Tukang kayu Rp 95,000.00 Rp 684,000.00
TENAGA
0.720 OH Kepala Tukang Rp 145,000.00 Rp 104,400.00
0.120 OH Mandor Rp 170,000.00 Rp 20,400.00
JUMLAH Rp 6,864,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 6,864,800.00
PEKERJAAN PENUTUP ATAP

1 m2 Memasang atap genteng kodok/glazzur SNI : 03-3436-2002


BAHAN 25.0000 bh Genteng kodok Rp 6,000.00 Rp 150,000.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.075 OH Tukang Kayu Rp 95,000.00 Rp 7,125.00
TENAGA
0.008 OH Kepala Tukang Rp 145,000.00 Rp 1,160.00
0.008 OH Mandor Rp 170,000.00 Rp 1,360.00
JUMLAH Rp 174,645.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 174,645.00

1 m2 Memasang atap genteng palentong/paris, kecil SNI : 03-3436-2002


BAHAN 25.0000 bh Genteng palentong/paris Rp 7,500.00 Rp 187,500.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.075 OH Tukang Kayu Rp 95,000.00 Rp 7,125.00
TENAGA
0.008 OH Kepala Tukang Rp 145,000.00 Rp 1,160.00
0.008 OH Mandor Rp 170,000.00 Rp 1,360.00
JUMLAH Rp 212,145.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 212,145.00

1 m2 Memasang atap genteng beton SNI : 03-3436-2002


9.0000 bh Genteng beton Rp 4,500.00 Rp 40,500.00
BAHAN
0.0300 kg Paku biasa 2"- 5" Rp 32,000.00 Rp 960.00
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.100 OH Tukang Kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.010 OH Mandor Rp 170,000.00 Rp 1,700.00
JUMLAH Rp 74,110.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 74,110.00

1 m2 Memasang atap genteng metal SNI : 03-3436-2002


1.0200 lbr Genteng metal Rp 95,000.00 Rp 96,900.00
BAHAN
0.2000 kg Paku biasa 2"- 5" Rp 32,000.00 Rp 6,400.00
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.100 OH Tukang Kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.010 OH Mandor Rp 170,000.00 Rp 1,700.00
JUMLAH Rp 135,950.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 135,950.00

1 m1 Memasang bubung genteng kodok/ glazzur SNI : 03-3436-2002


5.0000 bh Bubung genteng kodok Rp 8,000.00 Rp 40,000.00
BAHAN 8.0000 kg PC Rp 2,946.00 Rp 23,568.00
0.0320 m3 Pasir pasang Rp 600,000.00 Rp 19,200.00
0.400 OH Pekerja Rp 100,000.00 Rp 40,000.00
0.200 OH Tukang Kayu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.002 OH Mandor Rp 170,000.00 Rp 340.00
JUMLAH Rp 145,008.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 145,008.00
1 m1 Memasang bubung genteng palentong/paris SNI : 03-3436-2002
5.0000 bh Bubung genteng palentong/paris Rp 10,000.00 Rp 50,000.00
BAHAN 8.0000 kg PC Rp 2,946.00 Rp 23,568.00
0.0320 m3 Pasir pasang Rp 600,000.00 Rp 19,200.00
0.400 OH Pekerja Rp 100,000.00 Rp 40,000.00
0.200 OH Tukang Kayu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.002 OH Mandor Rp 170,000.00 Rp 340.00
JUMLAH Rp 155,008.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 155,008.00

1 m1 Memasang nok genteng beton SNI : 03-3436-2002


3.5000 bh Nok genteng beton Rp 10,000.00 Rp 35,000.00
0.0500 kg Paku biasa 2"- 5" Rp 32,000.00 Rp 1,600.00
BAHAN 10.8000 kg PC Rp 2,946.00 Rp 31,816.80
0.0320 kg Pasir pasang Rp 600,000.00 Rp 19,200.00
1.0000 kg Semen warna Rp 4,500.00 Rp 4,500.00
0.400 OH Pekerja Rp 100,000.00 Rp 40,000.00
0.200 OH Tukang Kayu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.002 OH Mandor Rp 170,000.00 Rp 340.00
JUMLAH Rp 154,356.80
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 154,356.80

1 m1 Memasang nok genteng metal SNI : 03-3436-2002


1.1000 bh Nok genteng metal Rp 75,000.00 Rp 82,500.00
BAHAN
0.0500 kg Paku biasa 1/2"-1" Rp 35,000.00
Rp 1,750.00
0.250 OH Pekerja Rp 100,000.00
Rp 25,000.00
0.150 OH Tukang Kayu Rp 95,000.00
Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00
Rp 2,175.00
0.013 OH Mandor Rp 170,000.00
Rp 2,210.00
JUMLAHRp 127,885.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 127,885.00

1 m2 Pasang atap asbes gelombang (2,25 x 0,92 m) x 5 mm SNI : 03-3436-2002


0.6000 lbr Asbes gelombang Rp 160,000.00 Rp 96,000.00
BAHAN
0.1200 bh Paku pancing Rp 2,000.00 Rp 240.00
0.140 OH Pekerja Rp 100,000.00 Rp 14,000.00
0.075 OH Tukang Kayu Rp 95,000.00 Rp 7,125.00
TENAGA
0.008 OH Kepala Tukang Rp 145,000.00 Rp 1,160.00
0.008 OH Mandor Rp 170,000.00 Rp 1,360.00
JUMLAH Rp 119,885.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 119,885.00

1 m2 Pasang atap asbes gelombang (1,5 x 0,92 m) x 5 mm SNI : 03-3436-2002


0.7250 lbr Asbes gelombang Rp 130,000.00 Rp 94,250.00
BAHAN
0.1200 bh Paku pancing Rp 2,000.00
Rp 240.00
0.140 OH Pekerja Rp 100,000.00
Rp 14,000.00
0.070 OH Tukang Kayu Rp 95,000.00
Rp 6,650.00
TENAGA
0.007 OH Kepala Tukang Rp 145,000.00
Rp 1,015.00
0.007 OH Mandor Rp 170,000.00
Rp 1,190.00
JUMLAHRp 117,345.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 117,345.00
1 m2 Pasang atap asbes gelombang (3,0 x 1,05 m) x 4 mm SNI : 03-3436-2002
0.3500 lbr Asbes gelombang Rp 120,000.00 Rp 42,000.00
BAHAN
0.1200 bh Paku pancing Rp 2,000.00 Rp 240.00
0.140 OH Pekerja Rp 100,000.00 Rp 14,000.00
0.070 OH Tukang Kayu Rp 95,000.00 Rp 6,650.00
TENAGA
0.007 OH Kepala Tukang Rp 145,000.00 Rp 1,015.00
0.007 OH Mandor Rp 170,000.00 Rp 1,190.00
JUMLAH Rp 65,095.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 65,095.00

1 m2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm SNI : 03-3436-2002


0.4400 lbr Asbes gelombang Rp 110,000.00 Rp 48,400.00
BAHAN
0.1200 bh Paku pancing Rp 2,000.00 Rp 240.00
0.140 OH Pekerja Rp 100,000.00
Rp 14,000.00
0.070 OH Tukang Kayu Rp 95,000.00
Rp 6,650.00
TENAGA
0.007 OH Kepala Tukang Rp 145,000.00
Rp 1,015.00
0.007 OH Mandor Rp 170,000.00
Rp 1,190.00
JUMLAHRp 71,495.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 71,495.00

1 m2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm SNI : 03-3436-2002


0.5100 lbr Asbes gelombang Rp 100,000.00 Rp 51,000.00
BAHAN
0.1200 bh Paku pancing Rp 2,000.00 Rp 240.00
0.140 OH Pekerja Rp 100,000.00 Rp 14,000.00
0.067 OH Tukang Kayu Rp 95,000.00 Rp 6,365.00
TENAGA
0.007 OH Kepala Tukang Rp 145,000.00 Rp 1,015.00
0.007 OH Mandor Rp 170,000.00 Rp 1,190.00
JUMLAH Rp 73,810.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 73,810.00

1 m' Pasang bubung stel gelombang 0,92 m SNI : 03-3436-2002


2.4000 lbr Bubung stel gelombang Rp 120,000.00 Rp 288,000.00
BAHAN
6.0000 bh Paku sekrup 3,5" Rp 2,500.00 Rp 15,000.00
0.084 OH Pekerja Rp 100,000.00 Rp 8,400.00
0.125 OH Tukang Kayu Rp 95,000.00 Rp 11,875.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,885.00
0.004 OH Mandor Rp 170,000.00 Rp 680.00
JUMLAH Rp 325,840.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 325,840.00

1 m' Pasang bubung stel gelombang 1,05 m SNI : 03-3436-2002


2.1000 lbr Bubung stel gelombang Rp 130,000.00 Rp 273,000.00
BAHAN
6.0000 bh Paku sekrup 3,5" Rp 2,500.00 Rp 15,000.00
0.084 OH Pekerja Rp 100,000.00 Rp 8,400.00
0.125 OH Tukang Kayu Rp 95,000.00 Rp 11,875.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,885.00
0.004 OH Mandor Rp 170,000.00 Rp 680.00
JUMLAH Rp 310,840.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 310,840.00
1 m2 Pasang atap seng gelombang BJLS 0.30 SNI : 03-3436-2002
0.7000 lbr Seng gelombang Rp 110,000.00 Rp 77,000.00
BAHAN
0.0200 bh Paku payung Rp 35,000.00 Rp 700.00
0.120 OH Pekerja Rp 100,000.00 Rp 12,000.00
0.060 OH Tukang Kayu Rp 95,000.00 Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 870.00
0.006 OH Mandor Rp 170,000.00 Rp 1,020.00
JUMLAH Rp 97,290.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 97,290.00

1 m' Pasang atap nok seng SNI : 03-3436-2002


0.3000 lbr Seng plat BJLS 0.30 Rp 90,000.00 Rp 27,000.00
BAHAN
0.0400 bh Paku payung Rp 35,000.00 Rp 1,400.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.070 OH Tukang Kayu Rp 95,000.00 Rp 6,650.00
TENAGA
0.008 OH Kepala Tukang Rp 145,000.00 Rp 1,160.00
0.008 OH Mandor Rp 170,000.00 Rp 1,360.00
JUMLAH Rp 52,570.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 52,570.00

1 m2 Pasang aluminium foil/ Sisalation SNI : 03-3436-2002


BAHAN 1.0500 m2 Sisalation/ aluminium foil Rp 125,000.00 Rp 131,250.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.050 OH Tukang Kayu Rp 95,000.00 Rp 4,750.00
TENAGA
0.005 OH Kepala Tukang Rp 145,000.00 Rp 725.00
0.008 OH Mandor Rp 170,000.00 Rp 1,360.00
JUMLAH Rp 153,085.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 153,085.00

1 m2 Pasang atap seng gelombang BJLS 0.25 Rp -


0.7000 lbr Seng gelombang Rp 85,000.00
Rp 59,500.00
BAHAN
0.0200 bh Paku payung Rp 35,000.00
Rp 700.00
0.120 OH Pekerja Rp 100,000.00
Rp 12,000.00
0.060 OH Tukang Kayu Rp 95,000.00
Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00
Rp 870.00
0.006 OH Mandor Rp 170,000.00
Rp 1,020.00
JUMLAHRp 79,790.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 79,790.00
I. PEKERJAAN LANGIT-LANGIT

1 m2 Memasang langit-langit asbes semen, tebal 4 mm, 5mm, 6 mm SNI : 2839:2008


1.1000 lbr Asbes semen 5 mm Rp 75,000.00 Rp 82,500.00
BAHAN
0.0100 kg Paku kecil 0.5" - 1" Rp 35,000.00 Rp 350.00
0.030 OH Pekerja Rp 100,000.00 Rp 3,000.00
0.070 OH Tukang Kayu Rp 95,000.00 Rp 6,650.00
TENAGA
0.007 OH Kepala Tukang Rp 145,000.00 Rp 1,015.00
0.004 OH Mandor Rp 170,000.00 Rp 680.00
JUMLAH Rp 94,195.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 94,195.00

1 m2 Memasang langit-langit akustik uk. (30 x 30) cm SNI : 2839:2008


12.0000 lbr Akustik Rp 65,000.00 Rp 780,000.00
BAHAN
0.0500 kg Paku kecil 0.5" - 1" Rp 35,000.00 Rp 1,750.00
0.120 OH Pekerja Rp 100,000.00 Rp 12,000.00
0.120 OH Tukang Kayu Rp 95,000.00 Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00 Rp 1,740.00
0.006 OH Mandor Rp 170,000.00 Rp 1,020.00
JUMLAH Rp 807,910.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 807,910.00

1 m2 Memasang langit-langit akustik uk. (30 x 60) cm SNI : 2839:2008


5.8000 lbr Akustik Rp 85,000.00 Rp 493,000.00
BAHAN
0.0500 kg Paku kecil 0.5" - 1" Rp 35,000.00 Rp 1,750.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.100 OH Tukang Kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 516,550.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 516,550.00

1 m2 Memasang langit-langit akustik uk. (60 x 120) cm SNI : 2839:2008


1.5000 lbr Akustik Rp 110,000.00 Rp 165,000.00
BAHAN
0.0500 kg Paku kecil 0.5" - 1" Rp 35,000.00 Rp 1,750.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.100 OH Tukang Kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 188,550.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 188,550.00

1 m2 Memasang langit-langit tripleks uk. (120 x 240) cm, tebal 5 mm SNI : 2839:2008
0.3750 lbr Tripleks 5 mm Rp 100,000.00
Rp 37,500.00
BAHAN
0.0300 kg Paku kecil 0.5" - 1" Rp 35,000.00
Rp 1,050.00
0.100 OH Pekerja Rp 100,000.00
Rp 10,000.00
0.100 OH Tukang Kayu Rp 95,000.00
Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00
Rp 1,450.00
0.005 OH Mandor Rp 170,000.00
Rp 850.00
JUMLAHRp 60,350.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 60,350.00

1 m2 Memasang langit-langit lambriziring kayu, tebal 9 mm SNI : 2839:2008


0.0150 m3 Papan kayu kls II Rp 3,000,000.00 Rp 45,000.00
BAHAN
0.0100 kg Paku kecil 0.5" - 1" Rp 35,000.00 Rp 350.00
0.800 OH Pekerja Rp 100,000.00 Rp 80,000.00
0.800 OH Tukang Kayu Rp 95,000.00 Rp 76,000.00
TENAGA
0.080 OH Kepala Tukang Rp 145,000.00 Rp 11,600.00
0.040 OH Mandor Rp 170,000.00 Rp 6,800.00
JUMLAH Rp 219,750.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 219,750.00
1 m2 Memasang langit-langit gypsum board, uk. (1200 x 2400 x 9) mm SNI : 2839:2008
0.3640 lbr Gypsum board Rp 210,000.00 Rp 76,440.00
BAHAN
0.1100 kg Paku sekrup Rp 45,000.00 Rp 4,950.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.050 OH Tukang Kayu Rp 95,000.00 Rp 4,750.00
TENAGA
0.005 OH Kepala Tukang Rp 145,000.00 Rp 725.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 97,715.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 97,715.00

1 m1 Memasang list gypsum profil SNI : 2839:2008


1.0500 m' List gypsum profil 2" Rp 45,000.00 Rp 47,250.00
BAHAN
0.1500 kg Tepung gypsum Rp 65,000.00 Rp 9,750.00
0.060 OH Pekerja Rp 100,000.00
Rp 6,000.00
0.060 OH Tukang Kayu Rp 95,000.00
Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00
Rp 870.00
0.003 OH Mandor Rp 170,000.00
Rp 510.00
JUMLAH Rp 70,080.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 70,080.00

1 m1 Memasang list langit-langit kayu profil SNI : 2839:2008


1.0500 m' List kayu profil 2" Rp 25,000.00 Rp 26,250.00
BAHAN
0.1000 kg Paku kecil 0.5" - 1" Rp 35,000.00 Rp 3,500.00
0.050 OH Pekerja Rp 100,000.00 Rp 5,000.00
0.050 OH Tukang Kayu Rp 95,000.00
Rp 4,750.00
TENAGA
0.005 OH Kepala Tukang Rp 145,000.00
Rp 725.00
0.003 OH Mandor Rp 170,000.00
Rp 510.00
JUMLAH Rp 40,735.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 40,735.00

1 m2 Memasang langit-langit akustik, uk. (60 x 120) cm + rangka


SNI : 2839:2008
alumunium
3.6000 m' Profil allumunium "T" Rp 55,000.00 Rp 198,000.00
0.1500 kg Kawat dia. 4 mm Rp 50,000.00 Rp 7,500.00
BAHAN
1.0500 bh Ramset Rp 5,000.00 Rp 5,250.00
1.5000 lbr Akustik Rp 110,000.00
Rp 165,000.00
0.500 OH Pekerja Rp 100,000.00
Rp 50,000.00
0.500 OH Tukang Kayu Rp 95,000.00
Rp 47,500.00
TENAGA
0.050 OH Kepala Tukang Rp 145,000.00
Rp 7,250.00
0.025 OH Mandor Rp 170,000.00
Rp 4,250.00
JUMLAH Rp 484,750.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 484,750.00
PEKERJAAN PENUTUP LANTAI & DINDING

1 m2 Memasang Lantai ubin PC abu-abu ukuran (40 x 40) cm SNI : 7395:2008


6.6300 bh Ubin Rp 9,000.00 Rp 59,670.00
BAHAN 9.8000 kg PC Rp 2,946.00 Rp 28,870.80
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
0.250 OH Pekerja Rp 100,000.00 Rp 25,000.00
0.125 OH Tukang batu Rp 95,000.00 Rp 11,875.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,812.50
0.013 OH Mandor Rp 170,000.00 Rp 2,125.00
JUMLAH Rp 156,353.30
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 156,353.30

1 m2 Memasang Lantai ubin PC abu-abu ukuran (30 x 30) cm SNI : 7395:2008


11.8700 bh Ubin Rp 8,000.00 Rp 94,960.00
BAHAN 10.0000 kg PC Rp 2,946.00 Rp 29,460.00
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
0.260 OH Pekerja Rp 100,000.00 Rp 26,000.00
0.130 OH Tukang batu Rp 95,000.00 Rp 12,350.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,885.00
0.013 OH Mandor Rp 170,000.00 Rp 2,210.00
JUMLAH Rp 193,865.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 193,865.00

1 m2 Memasang Lantai ubin PC abu-abu ukuran (20 x 20) cm SNI : 7395:2008


26.5000 bh Ubin Rp 7,000.00 Rp 185,500.00
BAHAN 10.4000 kg PC Rp 2,946.00 Rp 30,638.40
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
0.270 OH Pekerja Rp 100,000.00 Rp 27,000.00
0.135 OH Tukang batu Rp 95,000.00 Rp 12,825.00
TENAGA
0.014 OH Kepala Tukang Rp 145,000.00 Rp 1,957.50
0.014 OH Mandor Rp 170,000.00 Rp 2,295.00
JUMLAH Rp 287,215.90
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 287,215.90

1 m2 Memasang Lantai ubin PC warna ukuran (40 x 40) cm SNI : 7395:2008


6.6300 bh Ubin Rp 11,000.00 Rp 72,930.00
BAHAN 9.8000 kg PC Rp 2,946.00 Rp 28,870.80
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
0.250 OH Pekerja Rp 100,000.00 Rp 25,000.00
0.125 OH Tukang batu Rp 95,000.00 Rp 11,875.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,812.50
0.013 OH Mandor Rp 170,000.00 Rp 2,125.00
JUMLAH Rp 169,613.30
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 169,613.30

1 m2 Memasang Lantai ubin PC warna ukuran (30 x 30) cm SNI : 7395:2008


11.8700 bh Ubin Rp 10,000.00 Rp 118,700.00
BAHAN 10.0000 kg PC Rp 2,946.00 Rp 29,460.00
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
0.260 OH Pekerja Rp 100,000.00 Rp 26,000.00
0.130 OH Tukang batu Rp 95,000.00 Rp 12,350.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,885.00
0.013 OH Mandor Rp 170,000.00 Rp 2,210.00
JUMLAH Rp 217,605.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 217,605.00
1 m2 Memasang Lantai ubin PC warna ukuran (20 x 20) cm SNI : 7395:2008
26.5000 bh Ubin Rp 9,000.00 Rp 238,500.00
BAHAN 10.4000 kg PC Rp 2,946.00 Rp 30,638.40
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
0.270 OH Pekerja Rp 100,000.00 Rp 27,000.00
0.135 OH Tukang batu Rp 95,000.00 Rp 12,825.00
TENAGA
0.014 OH Kepala Tukang Rp 145,000.00 Rp 1,957.50
0.014 OH Mandor Rp 170,000.00 Rp 2,295.00
JUMLAH Rp 340,215.90
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 340,215.90

1 m2 Memasang lantai ubin teraso uk.(40x40) cm SNI : 7395:2008


6.6300 bh Ubin teraso Rp 25,000.00 Rp 165,750.00
9.8000 kg PC Rp 2,946.00 Rp 28,870.80
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.3000 kg Semen warna Rp 4,500.00 Rp 5,850.00
0.250 OH Pekerja Rp 100,000.00 Rp 25,000.00
0.125 OH Tukang batu Rp 95,000.00 Rp 11,875.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,812.50
0.013 OH Mandor Rp 170,000.00 Rp 2,125.00
JUMLAH Rp 268,283.30
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 268,283.30

1 m2 Memasang lantai ubin teraso uk.(30x30) cm SNI : 7395:2008


11.8700 bh Ubin teraso Rp 11,818.18 Rp 140,281.82
10.0000 kg PC Rp 2,946.00 Rp 29,460.00
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.5000 kg Semen warna Rp 4,500.00 Rp 6,750.00
0.260 OH Pekerja Rp 100,000.00 Rp 26,000.00
0.130 OH Tukang batu Rp 95,000.00 Rp 12,350.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,885.00
0.013 OH Mandor Rp 170,000.00 Rp 2,210.00
JUMLAH Rp 245,936.82
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 245,936.82

1 m2 Memasang lantai ubin granit uk.(40x40) cm SNI : 7395:2008


6.6300 bh Ubin granit Rp 31,666.67 Rp 209,950.00
9.8000 kg PC Rp 2,946.00 Rp 28,870.80
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.3000 kg Semen warna Rp 4,500.00 Rp 5,850.00
0.250 OH Pekerja Rp 100,000.00 Rp 25,000.00
0.125 OH Tukang batu Rp 95,000.00 Rp 11,875.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,812.50
0.013 OH Mandor Rp 170,000.00 Rp 2,125.00
JUMLAH Rp 312,483.30
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 312,483.30

1 m2 Memasang lantai ubin granit uk.(30x30) cm SNI : 7395:2008


11.8700 bh Ubin granit Rp 16,363.64 Rp 194,236.36
10.0000 kg PC Rp 2,946.00 Rp 29,460.00
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.5000 kg Semen warna Rp 4,500.00 Rp 6,750.00
0.260 OH Pekerja Rp 100,000.00 Rp 26,000.00
0.130 OH Tukang batu Rp 95,000.00 Rp 12,350.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,885.00
0.013 OH Mandor Rp 170,000.00 Rp 2,210.00
JUMLAH Rp 299,891.36
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 299,891.36
1 m2 Memasang lantai ubin teralux uk.(40x40) cm SNI : 7395:2008
6.6300 bh Ubin teralux kerang Rp 31,666.67 Rp 209,950.00
9.8000 kg PC Rp 2,946.00 Rp 28,870.80
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.3000 kg Semen warna Rp 4,500.00 Rp 5,850.00
0.250 OH Pekerja Rp 100,000.00 Rp 25,000.00
0.125 OH Tukang batu Rp 95,000.00 Rp 11,875.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,812.50
0.013 OH Mandor Rp 170,000.00 Rp 2,125.00
JUMLAH Rp 312,483.30
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 312,483.30

1 m2 Memasang lantai ubin teralux uk.(30x30) cm SNI : 7395:2008


11.8700 bh Ubin teralux kerang Rp 16,363.64 Rp 194,236.36
10.0000 kg PC Rp 2,946.00 Rp 29,460.00
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.5000 kg Semen warna Rp 4,500.00 Rp 6,750.00
0.260 OH Pekerja Rp 100,000.00 Rp 26,000.00
0.130 OH Tukang batu Rp 95,000.00 Rp 12,350.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,885.00
0.013 OH Mandor Rp 170,000.00 Rp 2,210.00
JUMLAH Rp 299,891.36
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 299,891.36

1 m2 Memasang lantai ubin teralux marmer uk.(60x60) cm SNI : 7395:2008


3.1000 bh Ubin teralux marmer Rp 96,666.67 Rp 299,666.67
9.6000 kg PC Rp 2,946.00 Rp 28,281.60
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.5000 kg Semen warna Rp 4,500.00 Rp 6,750.00
0.240 OH Pekerja Rp 100,000.00 Rp 24,000.00
0.120 OH Tukang batu Rp 95,000.00 Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00 Rp 1,740.00
0.012 OH Mandor Rp 170,000.00 Rp 2,040.00
JUMLAH Rp 400,878.27
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 400,878.27

1 m' Memasang plint ubin PC abu-abu uk.(10x20) cm SNI : 7395:2008


5.3000 bh Plint ubin Rp 3,500.00 Rp 18,550.00
BAHAN 1.6500 kg PC Rp 2,946.00 Rp 4,860.90
0.0040 m3 Pasir pasang Rp 600,000.00 Rp 2,400.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 45,430.90
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 45,430.90

1 m' Memasang plint ubin PC abu-abu uk.(10x30) cm SNI : 7395:2008


3.5300 bh Plint ubin Rp 4,000.00 Rp 14,120.00
BAHAN 1.2400 kg PC Rp 2,946.00 Rp 3,653.04
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 39,193.04
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 39,193.04
1 m' Memasang plint ubin PC abu-abu uk.(10x40) cm SNI : 7395:2008
2.6500 bh Plint ubin Rp 5,000.00 Rp 13,250.00
BAHAN 1.2400 kg PC Rp 2,946.00 Rp 3,653.04
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 38,323.04
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 38,323.04

1 m' Memasang plint ubin PC warna uk.(10x20) cm SNI : 7395:2008


5.3000 bh Plint ubin warna Rp 4,000.00 Rp 21,200.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 46,428.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 46,428.44

1 m' Memasang plint ubin PC warna uk.(10x30) cm SNI : 7395:2008


3.5300 bh Plint ubin warna Rp 4,500.00 Rp 15,885.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 41,113.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 41,113.44

1 m' Memasang plint ubin PC warna uk.(10x40) cm SNI : 7395:2008


2.6500 bh Plint ubin warna Rp 5,500.00 Rp 14,575.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 39,803.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 39,803.44

1 m' Memasang plint ubin teraso uk.(10x30) cm SNI : 7395:2008


3.5300 bh Plint ubin teraso Rp 8,500.00 Rp 30,005.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 55,233.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 55,233.44
1 m' Memasang plint ubin teraso uk.(10x40) cm SNI : 7395:2008
2.6500 bh Plint ubin teraso Rp 9,500.00 Rp 25,175.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 50,403.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 50,403.44

1 m' Memasang plint ubin granit uk.(10x40) cm SNI : 7395:2008


2.6500 bh Plint ubin granit Rp 10,500.00 Rp 27,825.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 53,053.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 53,053.44

1 m' Memasang plint ubin granit uk.(10x30) cm SNI : 7395:2008


3.5300 bh Plint ubin granit Rp 9,000.00 Rp 31,770.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 56,998.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 56,998.44

1 m' Memasang plint ubin teralux marmer uk.(10x40) cm SNI : 7395:2008


2.6500 bh Plint ubin teralux marmer Rp 9,000.00 Rp 23,850.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 49,078.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 49,078.44

1 m' Memasang plint ubin teralux marmer uk.(10x30) cm SNI : 7395:2008


3.5300 bh Plint ubin teralux marmer Rp 8,000.00 Rp 28,240.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 53,468.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 53,468.44
1 m' Memasang plint ubin teralux marmer uk.(10x60) cm SNI : 7395:2008
1.7000 bh Plint ubin teralux marmer Rp 12,000.00 Rp 20,400.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 45,628.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 45,628.44

1 m2 Memasang lantai teraso cor di tempat, tebal 3 cm SNI : 7395:2008


BAHAN 0.0360 m3 Bahan teraso cor Rp 700,000.00 Rp 25,200.00
0.360 OH Pekerja Rp 100,000.00 Rp 36,000.00
0.180 OH Tukang batu Rp 95,000.00 Rp 17,100.00
TENAGA
0.018 OH Kepala Tukang Rp 145,000.00 Rp 2,610.00
0.018 OH Mandor Rp 170,000.00 Rp 3,060.00
JUMLAH Rp 83,970.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 83,970.00

1 m2 Memasang lantai keramik artistik uk.(10x20) cm SNI : 7395:2008


53.0000 bh Ubin keramik Rp 5,000.00 Rp 265,000.00
8.1900 kg PC Rp 2,946.00 Rp 24,127.74
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
2.7500 kg Semen warna Rp 4,500.00 Rp 12,375.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 442,777.74
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 442,777.74

1 m2 Memasang lantai keramik artistik uk.(10x10) cm / (5 x 20) cm SNI : 7395:2008


106.0000 bh Ubin keramik 10 x 10 cm Rp 4,000.00 Rp 424,000.00
8.1900 kg PC Rp 2,946.00 Rp 24,127.74
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
3.2000 kg Semen warna Rp 4,500.00 Rp 14,400.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 603,802.74
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 603,802.74

1 m2 Memasang lantai keramik uk.(33x33) cm SNI : 7395:2008


10.0000 bh Ubin keramik Rp 14,444.44 Rp 144,444.44
8.1900 kg PC Rp 2,946.00 Rp 24,127.74
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.6200 kg Semen warna Rp 4,500.00 Rp 7,290.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 317,137.18
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 317,137.18
1 m2 Memasang lantai keramik uk.(30x30) cm SNI : 7395:2008
11.8700 bh Ubin keramik 30x30 Rp 11,818.18 Rp 140,281.82
10.0000 kg PC Rp 2,946.00 Rp 29,460.00
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.5000 kg Semen warna Rp 4,500.00 Rp 6,750.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 317,766.82
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 317,766.82

1 m2 Memasang lantai keramik uk.(30x30) cm anti slip SNI : 7395:2008


11.8700 bh Ubin keramik 30x30 anti slip Rp 13,181.82 Rp 156,468.18
10.0000 kg PC Rp 2,946.00 Rp 29,460.00
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.5000 kg Semen warna Rp 4,500.00 Rp 6,750.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 333,953.18
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 333,953.18

1 m2 Memasang lantai keramik uk.(20x20) cm SNI : 7395:2008


26.5000 bh Ubin keramik 20x20 Rp 5,800.00 Rp 153,700.00
10.4000 kg PC Rp 2,946.00 Rp 30,638.40
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.6200 kg Semen warna Rp 4,500.00 Rp 7,290.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 332,903.40
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 332,903.40

1 m2 Memasang lantai keramik uk.(20x20) cm anti slip SNI : 7395:2008


26.5000 bh Ubin keramik 20x20 anti slip Rp 6,000.00 Rp 159,000.00
10.4000 kg PC Rp 2,946.00 Rp 30,638.40
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.6200 kg Semen warna Rp 4,500.00 Rp 7,290.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 338,203.40
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 338,203.40

1 m1 Memasang plint keramik uk.(10x30) cm SNI : 7395:2008


3.5300 bh Plint keramik Rp 3,200.00 Rp 11,296.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 36,609.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 36,609.44
1 m2 Memasang lantai mosaik uk.(30x30) cm camp. 1 PC : 3 PP SNI : 7395:2008
11.8700 bh mosaik Rp 14,090.91 Rp 167,259.09
14.1500 kg PC Rp 2,946.00 Rp 41,685.90
BAHAN
0.0390 m3 Pasir pasang Rp 600,000.00 Rp 23,400.00
2.0000 kg Semen warna Rp 4,500.00 Rp 9,000.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 355,619.99
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 355,619.99

1 m' Memasang plint keramik uk.(10x20) cm SNI : 7395:2008


5.3000 bh Plint keramik Rp 2,800.00 Rp 14,840.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.0250 kg Semen warna Rp 4,500.00 Rp 112.50
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 39,730.94
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 39,730.94

1 m' Memasang plint kermik uk.(10x10) cm SNI : 7395:2008


10.6000 bh Plint keramik Rp 2,300.00 Rp 24,380.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.0500 kg Semen warna Rp 4,500.00 Rp 225.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 49,383.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 49,383.44

1 m' Memasang plint keramik uk.(5x20) cm SNI : 7395:2008


5.3000 bh Plint keramik Rp 2,500.00 Rp 13,250.00
0.5700 kg PC Rp 2,946.00 Rp 1,679.22
BAHAN
0.0015 m3 Pasir pasang Rp 600,000.00 Rp 900.00
0.013 kg Semen warna Rp 4,500.00 Rp 56.25
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 35,505.47
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 35,505.47
1 m' Memasang plint internal cove artistik uk.(5x5x20) cm SNI : 7395:2008
5.3000 bh internal cove Rp 12,000.00 Rp 63,600.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.100 kg Semen warna Rp 4,500.00 Rp 450.00
0.750 OH Pekerja Rp 100,000.00 Rp 75,000.00
0.750 OH Tukang batu Rp 95,000.00 Rp 71,250.00
TENAGA
0.075 OH Kepala Tukang Rp 145,000.00 Rp 10,875.00
0.038 OH Mandor Rp 170,000.00 Rp 6,460.00
JUMLAH Rp 232,793.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 232,793.44

1 m2 Memasang lantai marmer uk.(100x100) cm SNI : 7395:2008


1.0600 bh Marmer ex DN Rp 320,000.00 Rp 339,200.00
8.1900 kg PC Rp 2,946.00 Rp 24,127.74
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
0.6500 kg Semen warna Rp 4,500.00 Rp 2,925.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 507,527.74
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 507,527.74

1 m2 Memasang lantai karpet SNI : 7395:2008


1.0500 m2 Karpet Rp 425,000.00 Rp 446,250.00
BAHAN
0.3500 kg Lem vinyl Rp 65,000.00 Rp 22,750.00
0.170 OH Pekerja Rp 100,000.00 Rp 17,000.00
0.170 OH Tukang Kayu Rp 95,000.00 Rp 16,150.00
TENAGA
0.017 OH Kepala Tukang Rp 145,000.00 Rp 2,465.00
0.009 OH Mandor Rp 170,000.00 Rp 1,445.00
JUMLAH Rp 506,060.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 506,060.00

1 m2 Memasang underlayer / pelapis bawah karpet SNI : 7395:2008


1.0500 m2 under layer / rubber corrrugated Rp 220,000.00 Rp 231,000.00
BAHAN
0.3500 kg Lem vinyl Rp 65,000.00 Rp 22,750.00
0.120 OH Pekerja Rp 100,000.00 Rp 12,000.00
0.120 OH Tukang Kayu Rp 95,000.00 Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00 Rp 1,740.00
0.006 OH Mandor Rp 170,000.00 Rp 1,020.00
JUMLAH Rp 279,910.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 279,910.00

1 m2 Memasang lantai parquet kayu SNI : 7395:2008


1.0500 m2 parquet Rp 550,000.00 Rp 577,500.00
BAHAN
0.6000 kg Lem Rp 65,000.00 Rp 39,000.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang Kayu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 730,775.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 730,775.00

1 m2 Memasang lantai kayu ( gymfloor) SNI : 7395:2008


1.0500 m2 Gymfloor Rp 650,000.00 Rp 682,500.00
BAHAN
0.6000 kg Lem Rp 65,000.00 Rp 39,000.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang Kayu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 835,775.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 835,775.00
1 m2 Memasang dinding porselen uk.(11x11) cm SNI : 7395:2008
86.0000 bh Porselen Rp 5,000.00 Rp 430,000.00
9.3000 kg PC Rp 2,946.00 Rp 27,397.80
BAHAN
0.0180 m3 Pasir pasang Rp 600,000.00 Rp 10,800.00
1.5000 kg Semen warna Rp 4,500.00 Rp 6,750.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
0.500 OH Tukang batu Rp 95,000.00 Rp 47,500.00
TENAGA
0.050 OH Kepala Tukang Rp 145,000.00 Rp 7,250.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 638,197.80
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 638,197.80

1 m2 Memasang dinding porselen uk.(10x20) cm SNI : 7395:2008


53.0000 bh Porselen Rp 5,800.00 Rp 307,400.00
9.3000 kg PC Rp 2,946.00 Rp 27,397.80
BAHAN
0.0180 m3 Pasir pasang Rp 600,000.00 Rp 10,800.00
2.7500 kg Semen warna Rp 4,500.00 Rp 12,375.00
0.900 OH Pekerja Rp 100,000.00 Rp 90,000.00
0.450 OH Tukang batu Rp 95,000.00 Rp 42,750.00
TENAGA
0.045 OH Kepala Tukang Rp 145,000.00 Rp 6,525.00
0.045 OH Mandor Rp 170,000.00 Rp 7,650.00
JUMLAH Rp 504,897.80
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 504,897.80

1 m2 Memasang dinding porselen uk.(20x20) cm SNI : 7395:2008


26.5000 bh Porselen Rp 7,200.00 Rp 190,800.00
9.3000 kg PC Rp 2,946.00 Rp 27,397.80
BAHAN
0.0180 m3 Pasir pasang Rp 600,000.00 Rp 10,800.00
1.9400 kg Semen warna Rp 4,500.00 Rp 8,730.00
0.900 OH Pekerja Rp 100,000.00 Rp 90,000.00
0.450 OH Tukang batu Rp 95,000.00 Rp 42,750.00
TENAGA
0.045 OH Kepala Tukang Rp 145,000.00 Rp 6,525.00
0.045 OH Mandor Rp 170,000.00 Rp 7,650.00
JUMLAH Rp 384,652.80
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 384,652.80

1 m2 Memasang dinding keramik artistik uk.(10x20) cm SNI : 7395:2008


53.0000 bh Keramik artistik Rp 5,000.00 Rp 265,000.00
9.3000 kg PC Rp 2,946.00 Rp 27,397.80
BAHAN
0.0180 m3 Pasir pasang Rp 600,000.00 Rp 10,800.00
2.7500 kg Semen warna Rp 4,500.00 Rp 12,375.00
0.900 OH Pekerja Rp 100,000.00 Rp 90,000.00
0.450 OH Tukang batu Rp 95,000.00 Rp 42,750.00
TENAGA
0.045 OH Kepala Tukang Rp 145,000.00 Rp 6,525.00
0.045 OH Mandor Rp 170,000.00 Rp 7,650.00
JUMLAH Rp 462,497.80
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 462,497.80

1 m2 Memasang dinding keramik artistik uk.(5x20) cm SNI : 7395:2008


106.0000 bh Keramik artistik Rp 4,000.00 Rp 424,000.00
9.3000 kg PC Rp 2,946.00 Rp 27,397.80
BAHAN
0.0180 m3 Pasir pasang Rp 600,000.00 Rp 10,800.00
2.9000 kg Semen warna Rp 4,500.00 Rp 13,050.00
0.900 OH Pekerja Rp 100,000.00 Rp 90,000.00
0.450 OH Tukang batu Rp 95,000.00 Rp 42,750.00
TENAGA
0.045 OH Kepala Tukang Rp 145,000.00 Rp 6,525.00
0.045 OH Mandor Rp 170,000.00 Rp 7,650.00
JUMLAH Rp 622,172.80
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 622,172.80
1 m2 Memasang dinding keramik uk.(20x20) cm SNI : 7395:2008
26.5000 bh Keramik Rp 3,600.00 Rp 95,400.00
9.3000 kg PC Rp 2,946.00 Rp 27,397.80
BAHAN
0.0180 m3 Pasir pasang Rp 600,000.00 Rp 10,800.00
1.9400 kg Semen warna Rp 4,500.00 Rp 8,730.00
0.900 OH Pekerja Rp 100,000.00 Rp 90,000.00
0.450 OH Tukang batu Rp 95,000.00 Rp 42,750.00
TENAGA
0.045 OH Kepala Tukang Rp 145,000.00 Rp 6,525.00
0.045 OH Mandor Rp 170,000.00 Rp 7,650.00
JUMLAH Rp 289,252.80
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 289,252.80

1 m2 Memasang dinding keramik uk.(20x25) cm SNI : 7395:2008


21.2000 bh Keramik dinding 20x25 Rp 6,500.00 Rp 137,800.00
9.3000 kg PC Rp 2,946.00 Rp 27,397.80
BAHAN
0.0180 m3 Pasir pasang Rp 600,000.00 Rp 10,800.00
1.5520 kg Semen warna Rp 4,500.00 Rp 6,984.00
0.900 OH Pekerja Rp 100,000.00 Rp 90,000.00
0.450 OH Tukang batu Rp 95,000.00 Rp 42,750.00
TENAGA
0.045 OH Kepala Tukang Rp 145,000.00 Rp 6,525.00
0.045 OH Mandor Rp 170,000.00 Rp 7,650.00
JUMLAH Rp 329,906.80
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 329,906.80

1 m2 Memasang dinding marmer uk.(100x100) cm SNI : 7395:2008


1.0600 bh Marmer Rp 320,000.00 Rp 339,200.00
3.0030 Bh Paku beton 12 cm Rp 95,000.00 Rp 285,285.00
BAHAN 12.4400 kg PC Rp 2,946.00 Rp 36,648.24
0.0250 m3 Pasir pasang Rp 600,000.00 Rp 15,000.00
0.6500 kg Semen warna Rp 4,500.00 Rp 2,925.00
1.300 OH Pekerja Rp 100,000.00 Rp 130,000.00
0.650 OH Tukang batu Rp 95,000.00 Rp 61,750.00
TENAGA
0.065 OH Kepala Tukang Rp 145,000.00 Rp 9,425.00
0.065 OH Mandor Rp 170,000.00 Rp 11,050.00
JUMLAH Rp 891,283.24
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 891,283.24

1 m2 Memasang dinding bata pelapis uk.(3 x 7 x 24) cm SNI : 7395:2008


63.0000 bh Bata pelapis dinding Rp 25,000.00 Rp 1,575,000.00
12.4400 kg PC Rp 2,946.00 Rp 36,648.24
BAHAN
0.0250 m3 Pasir pasang Rp 600,000.00 Rp 15,000.00
2.7500 kg Semen warna Rp 4,500.00 Rp 12,375.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
0.500 OH Tukang batu Rp 95,000.00 Rp 47,500.00
TENAGA
0.050 OH Kepala Tukang Rp 145,000.00 Rp 7,250.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 1,802,273.24
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,802,273.24

1 m2 Memasang dinding batu paras SNI : 7395:2008


1.1000 m2 Batu paras Rp 25,000.00 Rp 27,500.00
BAHAN 11.7500 kg PC Rp 2,946.00 Rp 34,615.50
0.0350 m3 Pasir pasang Rp 600,000.00 Rp 21,000.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 197,390.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 197,390.50
1 m2 Memasang dinding batu tempel hitam SNI : 7395:2008
1.1000 m2 Batu tempel hitam Rp 250,000.00 Rp 275,000.00
BAHAN 11.7500 kg PC Rp 2,946.00 Rp 34,615.50
0.0350 m3 Pasir pasang Rp 600,000.00 Rp 21,000.00
0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
0.350 OH Tukang batu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.035 OH Mandor Rp 170,000.00 Rp 5,950.00
JUMLAH Rp 444,890.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 444,890.50

1 m2 Memasang lantai Vinyl uk. 30 x 30 cm KL. I SNI : 7395:2008


11.8700 bh vinyl Rp 95,000.00 Rp 1,127,650.00
BAHAN
0.3500 kg Lem vinyl Rp 65,000.00 Rp 22,750.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.150 OH Tukang Kayu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.008 OH Mandor Rp 170,000.00 Rp 1,275.00
JUMLAH Rp 1,183,100.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,183,100.00

1 m2 Memasang wall paper, lebar 50 cm SNI : 7395:2008


2.2000 m wall paper Rp 200,000.00 Rp 440,000.00
BAHAN
0.2500 kg Lem Rp 65,000.00 Rp 16,250.00
0.350 OH Pekerja Rp 100,000.00 Rp 35,000.00
0.175 OH Tukang Kayu Rp 95,000.00 Rp 16,625.00
TENAGA
0.017 OH Kepala Tukang Rp 145,000.00 Rp 2,501.25
0.002 OH Mandor Rp 170,000.00 Rp 297.50
JUMLAH Rp 510,673.75
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 510,673.75

1 m2 Memasang floor hardener SNI : 7395:2008


BAHAN 5.0000 kg Floor hardener Rp 65,000.00 Rp 325,000.00
0.120 OH Pekerja Rp 100,000.00 Rp 12,000.00
0.120 OH Tukang batu Rp 95,000.00 Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00 Rp 1,740.00
0.006 OH Mandor Rp 170,000.00 Rp 1,020.00
JUMLAH Rp 351,160.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 351,160.00

1 m2 Memasang lantai Vinyl karet uk. 15 x 30 cm dengan perekat SNI : 7395:2008


1.7600 bh vinyl karet Rp 75,000.00 Rp 132,000.00
BAHAN
0.0800 kg Lem vinyl Rp 65,000.00 Rp 5,200.00
0.080 OH Pekerja Rp 100,000.00 Rp 8,000.00
0.080 OH Tukang Kayu Rp 95,000.00 Rp 7,600.00
TENAGA
0.008 OH Kepala Tukang Rp 145,000.00 Rp 1,160.00
0.004 OH Mandor Rp 170,000.00 Rp 680.00
JUMLAH Rp 154,640.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 154,640.00

1 m' Memasang plint kayu kls II tebal 2 cm lebar 10 cm SNI : 7395:2008


0.0030 m3 Papan kayu kls II Rp 3,000,000.00 Rp 9,000.00
BAHAN
0.0500 kg Paku / sekrup 5 cm Rp 45,000.00 Rp 2,250.00
0.120 OH Pekerja Rp 100,000.00 Rp 12,000.00
0.120 OH Tukang Kayu Rp 95,000.00 Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00 Rp 1,740.00
0.006 OH Mandor Rp 170,000.00 Rp 1,020.00
JUMLAH Rp 37,410.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 37,410.00
1 m2 Memasang lantai ubin keramik uk.(40x40) cm SNI : 7395:2008
6.6300 bh Ubin keramik Rp 18,333.33 Rp 121,550.00
9.8000 kg PC Rp 2,946.00 Rp 28,870.80
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.3000 kg Semen warna Rp 4,500.00 Rp 5,850.00
0.250 OH Pekerja Rp 100,000.00 Rp 25,000.00
0.125 OH Tukang batu Rp 95,000.00 Rp 11,875.00
TENAGA
0.013 OH Kepala Tukang Rp 145,000.00 Rp 1,812.50
0.013 OH Mandor Rp 170,000.00 Rp 2,125.00
JUMLAH Rp 224,083.30
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 224,083.30

1 m' Memasang plint ubin keramik uk.(10x40) cm SNI : 7395:2008


2.6500 bh Plint ubin keramik Rp 5,000.00 Rp 13,250.00
1.1400 kg PC Rp 2,946.00 Rp 3,358.44
BAHAN
0.0030 m3 Pasir pasang Rp 600,000.00 Rp 1,800.00
0.1000 kg Semen warna Rp 4,500.00 Rp 450.00
0.090 OH Pekerja Rp 100,000.00 Rp 9,000.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 765.00
JUMLAH Rp 38,478.44
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 38,478.44

1 m2 Memasang lantai ubin granit uk.(60x60) cm SNI : 7395:2008


3.1000 bh Ubin granit Rp 96,666.67 Rp 299,666.67
9.6000 kg PC Rp 2,946.00 Rp 28,281.60
BAHAN
0.0450 m3 Pasir pasang Rp 600,000.00 Rp 27,000.00
1.5000 kg Semen warna Rp 4,500.00 Rp 6,750.00
0.240 OH Pekerja Rp 100,000.00 Rp 24,000.00
0.120 OH Tukang batu Rp 95,000.00 Rp 11,400.00
TENAGA
0.012 OH Kepala Tukang Rp 145,000.00 Rp 1,740.00
0.012 OH Mandor Rp 170,000.00 Rp 2,040.00
JUMLAH Rp 400,878.27
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 400,878.27
PEKERJAAN BESI

1 kg Pasang besi profil SNI : 7393:2008


BAHAN 1.1500 kg Besi profil Rp 75,000.00 Rp 86,250.00
0.060 OH Pekerja Rp 100,000.00 Rp 6,000.00
0.060 OH Tukang las Rp 95,000.00 Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 870.00
0.003 OH Mandor Rp 170,000.00 Rp 510.00
JUMLAH Rp 99,330.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 99,330.00

1 kg Pasang rangka kuda-kuda baja IWF SNI : 7393:2008


BAHAN 1.1500 kg Besi baja IWF Rp 80,000.00 Rp 92,000.00
0.060 OH Pekerja Rp 100,000.00 Rp 6,000.00
0.060 OH Tukang las Rp 95,000.00 Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 870.00
0.003 OH Mandor Rp 170,000.00 Rp 510.00
JUMLAH Rp 105,080.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 105,080.00

100 kg Pekerjaan perakitan SNI : 7393:2008


1.0000 ltr Solar Rp 10,000.00 Rp 10,000.00
BAHAN
0.1000 ltr Minyak pelumas Rp 45,000.00 Rp 4,500.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
0.100 OH Tukang besi konstruksi Rp 95,000.00 Rp 9,500.00
TENAGA
0.001 OH Kepala Tukang Rp 145,000.00 Rp 145.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
ALAT 0.800 Jam Sewa alat Rp 50,000.00 Rp 40,000.00
JUMLAH Rp 74,995.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 74,995.00

1 m2 Pintu besi plat baja tebal 2 mm rangkap, rangkap baja siku SNI : 7393:2008
15.0000 kg Besi siku L 30.30.3 Rp 85,000.00 Rp 1,275,000.00
BAHAN 32.8000 kg Besi plat baja Rp 45,000.00 Rp 1,476,000.00
0.0500 kg Kawat las Rp 75,000.00 Rp 3,750.00
1.050 OH Pekerja Rp 100,000.00 Rp 105,000.00
1.050 OH Tukang las Rp 95,000.00 Rp 99,750.00
TENAGA
0.105 OH Kepala Tukang Rp 145,000.00 Rp 15,225.00
0.0520 OH Mandor Rp 170,000.00 Rp 8,840.00
JUMLAH Rp 2,983,565.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,983,565.00
10 cm Pengelasan dengan las listrik SNI : 7393:2008
0.4000 kg Kawat las Rp 75,000.00 Rp 30,000.00
BAHAN 0.3000 liter Solar Rp 10,000.00 Rp 3,000.00
0.0400 liter Minyak pelumas Rp 45,000.00 Rp 1,800.00
0.040 OH Pekerja Rp 100,000.00 Rp 4,000.00
0.020 OH Tukang besi konstruksi Rp 95,000.00 Rp 1,900.00
TENAGA
0.002 OH Kepala Tukang Rp 145,000.00 Rp 290.00
0.002 OH Mandor Rp 170,000.00 Rp 340.00
ALAT 0.170 Jam Sewa alat Rp 50,000.00 Rp 8,500.00
JUMLAH Rp 49,830.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN / cm Rp 4,983.00

1 m2 Membuat rangka jendela besi scuare tube (25 x 5 ) cm SNI : 7393:2008


4.7600 m' Besi scuare tube Rp 65,000.00 Rp 309,400.00
BAHAN 4.5220 m' Besi lis kaca 1 x 1 cm Rp 65,000.00 Rp 293,930.00
20.0000 cm Pengelasan Rp 4,983.00 Rp 99,660.00
0.650 OH Pekerja Rp 100,000.00 Rp 65,000.00
0.650 OH Tukang besi konstruksi Rp 95,000.00 Rp 61,750.00
TENAGA
0.065 OH Kepala Tukang Rp 145,000.00 Rp 9,425.00
0.032 OH Mandor Rp 170,000.00 Rp 5,440.00
JUMLAH Rp 844,605.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 844,605.00

1 m2 Pasang pintu rolling door Almunium SNI : 7393:2008


BAHAN 1.0000 m2 Pintu gulung Almunium Rp 750,000.00 Rp 750,000.00
1.200 OH Pekerja Rp 100,000.00 Rp 120,000.00
1.200 OH Tukang kayu Rp 95,000.00 Rp 114,000.00
TENAGA
0.120 OH Tukang las Rp 95,000.00 Rp 11,400.00
0.006 OH Mandor Rp 170,000.00 Rp 1,020.00
JUMLAH Rp 996,420.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 996,420.00

1 m2 Pasang pintu lipat (folding gate) bahan plastik / PVC SNI : 7393:2008
BAHAN 1.0000 m2 Pintu lipat Rp 750,000.00 Rp 750,000.00
0.440 OH Pekerja Rp 100,000.00 Rp 44,000.00
0.440 OH Tukang kayu Rp 95,000.00 Rp 41,800.00
TENAGA
0.044 OH Kepala Tukang Rp 145,000.00 Rp 6,380.00
0.022 OH Mandor Rp 170,000.00 Rp 3,740.00
JUMLAH Rp 845,920.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 845,920.00

1 m2 Pasang sunscreen alluminium SNI : 7393:2008


BAHAN 1.0000 m2 Sunscreen aluminium Rp 750,000.00 Rp 750,000.00
0.080 OH Pekerja Rp 100,000.00 Rp 8,000.00
0.800 OH Tukang alumunium Rp 95,000.00 Rp 76,000.00
TENAGA
0.080 OH Kepala Tukang Rp 145,000.00 Rp 11,600.00
0.00400 OH Mandor Rp 170,000.00 Rp 680.00
JUMLAH Rp 846,280.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 846,280.00
1 m2 Pasang rolling door aluminium SNI : 7393:2008
BAHAN 1.0000 m2 Rolling door aluminium Rp 750,000.00 Rp 750,000.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
1.000 OH Tukang aluminium Rp 95,000.00 Rp 95,000.00
TENAGA
0.100 OH Kepala Tukang Rp 145,000.00 Rp 14,500.00
0.050 OH Mandor Rp 170,000.00 Rp 8,500.00
JUMLAH Rp 968,000.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 968,000.00

1 m' Pasang kusen pintu aluminium SNI : 7393:2008


1.1000 m' Profil aluminium 4" Rp 155,000.00 Rp 170,500.00
BAHAN 2.0000 buah Skrup fixer Rp 4,500.00 Rp 9,000.00
0.0600 tube Sealant Rp 85,000.00 Rp 5,100.00
0.043 OH Pekerja Rp 100,000.00 Rp 4,300.00
0.043 OH Tukang aluminium Rp 95,000.00 Rp 4,085.00
TENAGA
0.0043 OH Kepala Tukang Rp 145,000.00 Rp 623.50
0.0021 OH Mandor Rp 170,000.00 Rp 357.00
JUMLAH Rp 193,965.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 193,965.50

1 m2 Pasang pintu aluminium strip lebar 8 cm SNI : 7393:2008


4.4000 m' Profil aluminium 3" Rp 145,000.00 Rp 638,000.00
BAHAN
14.6000 m' Alluminium strip Rp 90,000.00 Rp 1,314,000.00
0.085 OH Pekerja Rp 100,000.00 Rp 8,500.00
0.085 OH Tukang aluminium Rp 95,000.00 Rp 8,075.00
TENAGA
0.0085 OH Kepala Tukang Rp 145,000.00 Rp 1,232.50
0.0042 OH Mandor Rp 170,000.00 Rp 714.00
JUMLAH Rp 1,970,521.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,970,521.50

1 m2 Pasang pintu kaca rangka aluminium SNI : 7393:2008


4.4000 m Profil aluminium Rp 155,000.00 Rp 682,000.00
BAHAN 4.5000 m Profil kaca Rp 90,000.00 Rp 405,000.00
0.2700 tube Sealant Rp 85,000.00 Rp 22,950.00
0.085 OH Pekerja Rp 100,000.00 Rp 8,500.00
0.085 OH Tukang aluminium Rp 95,000.00 Rp 8,075.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 1,128,680.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,128,680.00

1 m2 Pasang venetions blinds dan verical blinds (tirai) SNI : 7393:2008


BAHAN 1.0000 m2 vertikal blinds Rp 1,200,000.00 Rp 1,200,000.00
0.350 OH Pekerja Rp 100,000.00 Rp 35,000.00
0.350 OH Tukang kayu Rp 95,000.00 Rp 33,250.00
TENAGA
0.035 OH Kepala Tukang Rp 145,000.00 Rp 5,075.00
0.018 OH Mandor Rp 170,000.00 Rp 2,975.00
JUMLAH Rp 1,276,300.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,276,300.00
1 m2 Pasang besi Siku (20 x 3) mm SNI : 7393:2008
6.1770 kg Besi Siku (0,3 x 2) cm Rp 55,000.00 Rp 339,735.00
BAHAN
27.0800 cm Pengelasan Rp 4,983.00 Rp 134,939.64
1.670 OH Pekerja Rp 100,000.00 Rp 167,000.00
1.670 OH Tukang kayu Rp 95,000.00 Rp 158,650.00
TENAGA
0.167 OH Kepala Tukang Rp 145,000.00 Rp 24,215.00
0.083 OH Mandor Rp 170,000.00 Rp 14,110.00
JUMLAH Rp 838,649.64
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 838,649.64

1 m2 Pasang kawat Ram SNI : 7393:2008


1.1000 m2 Kawat Ram Rp 250,000.00 Rp 275,000.00
BAHAN 11.1100 cm Pengelasan Rp 4,983.00 Rp 55,361.13

0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00


0.100 OH Tukang kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 352,161.13
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 352,161.13

1 m2 Pasang jendela nako dan tralis SNI : 7393:2008


1.1000 m2 Jendela nako (rangka + kaca 5 mm) Rp 1,250,000.00 Rp 1,375,000.00
BAHAN 10.0000 bh Paku skrup Rp 2,500.00 Rp 25,000.00
7.0000 m' Besi strip Rp 25,000.00 Rp 175,000.00
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.200 OH Tukang kayu Rp 95,000.00 Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00 Rp 2,900.00
0.010 OH Mandor Rp 170,000.00 Rp 1,700.00
JUMLAH Rp 1,618,600.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,618,600.00

1 m' Pasang talang datar/ jurai seng BJLS 25 lebar 90 cm SNI : 7393:2008
1.0500 m' Seng plat Rp 75,000.00 Rp 78,750.00
BAHAN 0.0150 kg Paku 0.5" - 1" Rp 35,000.00 Rp 525.00
0.0190 m3 Papan kayu Klas II Rp 3,000,000.00 Rp 57,000.00
0.200 OH Pekerja Rp 100,000.00 Rp 20,000.00
0.400 OH Tukang kayu Rp 95,000.00 Rp 38,000.00
TENAGA
0.025 OH Kepala Tukang Rp 145,000.00 Rp 3,625.00
0.010 OH Mandor Rp 170,000.00 Rp 1,700.00
JUMLAH Rp 199,600.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 199,600.00

1 m' Pasang talang 1/2 lingkaran D-15 cm, seng plat BJLS 30 lebar 45 cm SNI : 7393:2008
1.0500 m' Seng plat Rp 90,000.00 Rp 94,500.00
BAHAN 0.0100 kg Paku 0.5" - 1" Rp 35,000.00 Rp 350.00
0.5000 kg Besi strip Rp 45,000.00 Rp 22,500.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
0.300 OH Tukang kayu Rp 95,000.00 Rp 28,500.00
TENAGA
0.030 OH Kepala Tukang Rp 145,000.00 Rp 4,350.00
TENAGA

0.008 OH Mandor Rp 170,000.00 Rp 1,360.00


JUMLAH Rp 166,560.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 166,560.00
L. PEKERJAAN SANITAIR

1 buah Pasang kloset duduk/monoblok SNI : 2002


1.0000 bh kloset duduk/monoblok Rp 1,750,000.00 Rp 1,750,000.00
BAHAN
6% Harga kloset Perlengkapan Rp 105,000.00
3.300 OH Pekerja Rp 100,000.00 Rp 330,000.00
1.100 OH Tukang batu Rp 95,000.00 Rp 104,500.00
TENAGA
0.001 OH Kepala Tukang Rp 145,000.00 Rp 145.00
0.1600 OH Mandor Rp 170,000.00 Rp 27,200.00
JUMLAH Rp 2,316,845.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,316,845.00

1 buah Pasang kloset jongkok SNI : 2002


1.0000 bh kloset jongkok Rp 4,000,000.00 Rp 4,000,000.00
BAHAN 6.0000 kg PC Rp 2,946.00 Rp 17,676.00
0.0100 m3 Pasir pasang Rp 600,000.00 Rp 6,000.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
1.500 OH Tukang batu Rp 95,000.00 Rp 142,500.00
TENAGA
1.500 OH Kepala Tukang Rp 145,000.00 Rp 217,500.00
0.1600 OH Mandor Rp 170,000.00 Rp 27,200.00
JUMLAH Rp 4,510,876.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 4,510,876.00

1 buah urinoir SNI : 2002


1.0000 bh Urinoir Rp 3,200,000.00 Rp 3,200,000.00
30% harga urinoir Perlengkapan Rp 960,000.00
BAHAN
6.0000 kg PC Rp 2,946.00 Rp 17,676.00
0.0100 m3 Pasir pasang Rp 600,000.00 Rp 6,000.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
1.000 OH Tukang batu Rp 95,000.00 Rp 95,000.00
TENAGA
0.100 OH Kepala Tukang Rp 145,000.00 Rp 14,500.00
0.1000 OH Mandor Rp 170,000.00 Rp 17,000.00
JUMLAH Rp 4,410,176.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 4,410,176.00

1 buah washtafel SNI : 2002


1.0000 bh Washtafel Rp 3,000,000.00 Rp 3,000,000.00
12% hrg Washtafel Perlengkapan Rp 360,000.00
BAHAN
6.0000 kg PC Rp 2,946.00 Rp 17,676.00
0.0100 m3 Pasir pasang Rp 600,000.00 Rp 6,000.00
1.200 OH Pekerja Rp 100,000.00 Rp 120,000.00
0.750 OH Tukang batu Rp 95,000.00 Rp 71,250.00
TENAGA
0.070 OH Kepala Tukang Rp 145,000.00 Rp 10,150.00
0.1100 OH Mandor Rp 170,000.00 Rp 18,700.00
JUMLAH Rp 3,603,776.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 3,603,776.00

1 buah bak mandi batu bata vol. 0,3 m3 SNI : 2002


252.000 bh Batu bata Rp 3,000.00 Rp 756,000.00
120.000 kg PC Rp 2,946.00 Rp 353,520.00
BAHAN 0.3000 m3 Pasir pasang Rp 600,000.00 Rp 180,000.00
108.900 bh Keramik 20x20 Rp 5,800.00 Rp 631,620.00
6.0000 kg Semen warna Rp 4,500.00 Rp 27,000.00
6.000 OH Pekerja Rp 100,000.00 Rp 600,000.00
3.000 OH Tukang batu Rp 95,000.00 Rp 285,000.00
TENAGA
0.300 OH Kepala Tukang Rp 145,000.00 Rp 43,500.00
0.3000 OH Mandor Rp 170,000.00 Rp 51,000.00
JUMLAH Rp 2,927,640.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 2,927,640.00
1 buah bak kontrol batu bata uk. (60x60) cm, tinggi 65 cm SNI : 2002
234.000 bh Batu bata Rp 3,000.00 Rp 702,000.00
114.000 kg PC Rp 2,946.00 Rp 335,844.00
0.1840 m3 Pasir pasang Rp 600,000.00 Rp 110,400.00
BAHAN
0.0330 m3 Koral beton 2/3 Rp 980,000.00 Rp 32,340.00
4.8500 kg Besi beton Rp 25,000.00 Rp 121,250.00
0.1200 m3 Pasir beton Rp 600,000.00 Rp 72,000.00
2.160 OH Pekerja Rp 100,000.00 Rp 216,000.00
0.720 OH Tukang batu Rp 95,000.00 Rp 68,400.00
TENAGA 0.072 OH Kepala Tukang Rp 145,000.00 Rp 10,440.00
0.108 OH Mandor Rp 170,000.00 Rp 18,360.00
0.1000 OH Tukang gali Rp 95,000.00 Rp 9,500.00
JUMLAH Rp 1,696,534.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,696,534.00

1 m1 Pasang pipa galvanis dia 1/2" SNI : 2002


1.2000 m' Pipa galvanis Rp 85,000.00 Rp 102,000.00
BAHAN
35% Harga pipa Perlengkapan Rp 29,750.00
0.054 OH Pekerja Rp 100,000.00 Rp 5,400.00
0.090 OH Tukang batu Rp 95,000.00 Rp 8,550.00
TENAGA
0.009 OH Kepala Tukang Rp 145,000.00 Rp 1,305.00
0.0270 OH Mandor Rp 170,000.00 Rp 4,590.00
JUMLAH Rp 151,595.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 151,595.00

1 m1 Pasang pipa PVC tipe AW dia 1/2" SNI : 2002


1.2000 m' Pipa PVC Rp 35,000.00 Rp 42,000.00
BAHAN
35% Harga pipa Perlengkapan Rp 12,250.00
0.036 OH Pekerja Rp 100,000.00 Rp 3,600.00
0.060 OH Tukang batu Rp 95,000.00 Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 870.00
0.0018 OH Mandor Rp 170,000.00 Rp 306.00
JUMLAH Rp 64,726.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 64,726.00

1 m1 Pasang pipa PVC tipe AW dia 3/4" SNI : 2002


1.2000 m' Pipa PVC Rp 37,500.00 Rp 45,000.00
BAHAN
35% Harga pipa Perlengkapan Rp 13,125.00
0.036 OH Pekerja Rp 100,000.00 Rp 3,600.00
0.060 OH Tukang batu Rp 95,000.00 Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 870.00
0.0018 OH Mandor Rp 170,000.00 Rp 306.00
JUMLAH Rp 68,601.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 68,601.00

1 m1 Pasang pipa PVC tipe AW dia 2" SNI : 2002


1.2000 m' Pipa PVC Rp 40,000.00 Rp 48,000.00
BAHAN
35% Harga pipa Perlengkapan Rp 14,000.00
0.036 OH Pekerja Rp 100,000.00 Rp 3,600.00
0.060 OH Tukang batu Rp 95,000.00 Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 870.00
0.0018 OH Mandor Rp 170,000.00 Rp 306.00
JUMLAH Rp 72,476.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 72,476.00
1 m1 Pasang pipa PVC tipe AW dia 1,5" SNI : 2002
1.2000 m' Pipa PVC Rp 42,500.00 Rp 51,000.00
BAHAN
35% Harga pipa Perlengkapan Rp 14,875.00
0.036 OH Pekerja Rp 100,000.00 Rp 3,600.00
0.060 OH Tukang batu Rp 95,000.00 Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 870.00
0.0018 OH Mandor Rp 170,000.00 Rp 306.00
JUMLAH Rp 76,351.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 76,351.00

1 m1 Pasang pipa PVC tipe AW dia 3" SNI : 2002


1.2000 m' Pipa PVC Rp 45,000.00 Rp 54,000.00
BAHAN
35% Harga pipa Perlengkapan Rp 15,750.00
0.036 OH Pekerja Rp 100,000.00 Rp 3,600.00
0.060 OH Tukang batu Rp 95,000.00 Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 870.00
0.0018 OH Mandor Rp 170,000.00 Rp 306.00
JUMLAH Rp 80,226.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 80,226.00

1 m1 Pasang pipa PVC tipe AW dia 4" SNI : 2002


1.2000 m' Pipa PVC Rp 55,000.00 Rp 66,000.00
BAHAN
35% Harga pipa Perlengkapan Rp 19,250.00
0.036 OH Pekerja Rp 100,000.00 Rp 3,600.00
0.060 OH Tukang batu Rp 95,000.00 Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 870.00
0.0018 OH Mandor Rp 170,000.00 Rp 306.00
JUMLAH Rp 95,726.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 95,726.00

1 buah Pasang kran dia 1/2" dan 3/4" SNI : 2002


1.0000 bh Kran 1/2" Rp 55,000.00 Rp 55,000.00
BAHAN
0.0250 bh Seal tape Rp 8,000.00 Rp 200.00
0.010 OH Pekerja Rp 100,000.00 Rp 1,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.0050 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 68,000.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 68,000.00

1 buah Pasang floordrain SNI : 2002


BAHAN 1.0000 bh Floordrain stainless Rp 75,000.00 Rp 75,000.00
0.010 OH Pekerja Rp 100,000.00 Rp 1,000.00
0.100 OH Tukang batu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.0050 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 87,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 87,800.00
M. PEKERJAAN PENGGANTUNG & PENGUNCI

1 buah Pasang kunci tanam biasa (besar) SNI : 2002


BAHAN 1.0000 bh Kunci tanam besar Rp 250,000.00 Rp 250,000.00
0.010 OH Pekerja Rp 100,000.00
Rp 1,000.00
0.500 OH Tukang kayu Rp 95,000.00
Rp 47,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00
Rp 1,450.00
0.005 OH Mandor Rp 170,000.00
Rp 850.00
JUMLAH Rp 300,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 300,800.00

1 buah Pasang kunci tanam biasa (kecil) SNI : 2002


BAHAN 1.0000 bh Kunci tanam kecil Rp 185,000.00 Rp 185,000.00
0.010 OH Pekerja Rp 100,000.00 Rp 1,000.00
0.500 OH Tukang kayu Rp 95,000.00 Rp 47,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 235,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 235,800.00

1 buah Pasang kunci silinder SNI : 2002


BAHAN 1.0000 bh Kunci silinder Rp 200,000.00
Rp 200,000.00
0.005 OH Pekerja Rp 100,000.00
Rp 500.00
0.500 OH Tukang kayu Rp 95,000.00
Rp 47,500.00
TENAGA
0.005 OH Kepala Tukang Rp 145,000.00
Rp 725.00
0.0025 OH Mandor Rp 170,000.00
Rp 425.00
JUMLAH Rp 249,150.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 249,150.00

1 buah Pasang engsel pintu SNI : 2002


BAHAN 1.0000 bh Engsel pintu Rp 25,000.00 Rp 25,000.00
0.015 OH Pekerja Rp 100,000.00 Rp 1,500.00
0.150 OH Tukang kayu Rp 95,000.00
Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00
Rp 2,175.00
0.00075 OH Mandor Rp 170,000.00
Rp 127.50
JUMLAH Rp 43,052.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 43,052.50

1 buah Pasang engsel jendela SNI : 2002


BAHAN 1.0000 bh Engsel jendela Rp 15,000.00 Rp 15,000.00
0.010 OH Pekerja Rp 100,000.00 Rp 1,000.00
0.100 OH Tukang kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.00050 OH Mandor Rp 170,000.00 Rp 85.00
JUMLAH Rp 27,035.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 27,035.00

1 buah Pasang engsel jendela kupu-kupu SNI : 2002


BAHAN 1.0000 bh Engsel jendela kupu-kupu Rp 20,000.00 Rp 20,000.00
0.010 OH Pekerja Rp 100,000.00 Rp 1,000.00
0.100 OH Tukang kayu Rp 95,000.00 Rp 9,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.00050 OH Mandor Rp 170,000.00 Rp 85.00
JUMLAH Rp 32,035.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 32,035.00
1 buah Pasang grendel pintu SNI : 2002
BAHAN 1.0000 bh Grendel pintu Rp 35,000.00 Rp 35,000.00
0.020 OH Pekerja Rp 100,000.00
Rp 2,000.00
0.200 OH Tukang kayu Rp 95,000.00
Rp 19,000.00
TENAGA
0.020 OH Kepala Tukang Rp 145,000.00
Rp 2,900.00
0.00100 OH Mandor Rp 170,000.00
Rp 170.00
JUMLAH Rp 59,070.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 59,070.00

1 buah Pasang grendel jendela SNI : 2002


BAHAN 1.0000 bh Grendel jendela Rp 25,000.00 Rp 25,000.00
0.015 OH Pekerja Rp 100,000.00 Rp 1,500.00
0.150 OH Tukang kayu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.00050 OH Mandor Rp 170,000.00 Rp 85.00
JUMLAH Rp 43,010.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 43,010.00

1 buah Pasang hak angin SNI : 2002


BAHAN 1.0000 bh Hak angin Rp 35,000.00 Rp 35,000.00
0.015 OH Pekerja Rp 100,000.00 Rp 1,500.00
0.150 OH Tukang kayu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.00075 OH Mandor Rp 170,000.00 Rp 127.50
JUMLAH Rp 53,052.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 53,052.50

1 buah Pasang pegangan pintu/ door holder SNI : 2002


BAHAN 1.0000 bh Pegangan pintu Rp 250,000.00 Rp 250,000.00
0.050 OH Pekerja Rp 100,000.00 Rp 5,000.00
0.500 OH Tukang kayu Rp 95,000.00
Rp 47,500.00
TENAGA
0.050 OH Kepala Tukang Rp 145,000.00
Rp 7,250.00
0.00250 OH Mandor Rp 170,000.00
Rp 425.00
JUMLAH Rp 310,175.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 310,175.00

1 buah Pasang pegangan jendela/handel SNI : 2002


BAHAN 1.0000 bh Pegangan jendela/ handel Rp 50,000.00 Rp 50,000.00
0.015 OH Pekerja Rp 100,000.00 Rp 1,500.00
0.150 OH Tukang kayu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.00015 OH Mandor Rp 170,000.00 Rp 25.50
JUMLAH Rp 67,950.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 67,950.50

1 buah Pasang door closer SNI : 2002


BAHAN 1.0000 bh Door closer Rp 350,000.00 Rp 350,000.00
0.050 OH Pekerja Rp 100,000.00 Rp 5,000.00
0.500 OH Tukang kayu Rp 95,000.00 Rp 47,500.00
TENAGA
0.050 OH Kepala Tukang Rp 145,000.00 Rp 7,250.00
0.00250 OH Mandor Rp 170,000.00 Rp 425.00
JUMLAH Rp 410,175.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 410,175.00
1 m2 Pasang kaca bening 3 mm SNI : 2002
BAHAN 1.1000 m2 Kaca bening 3 mm Rp 250,000.00 Rp 275,000.00
0.015 OH Pekerja Rp 100,000.00
Rp 1,500.00
0.150 OH Tukang kayu Rp 95,000.00
Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00
Rp 2,175.00
0.00075 OH Mandor Rp 170,000.00
Rp 127.50
JUMLAH Rp 293,052.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 293,052.50

1 m2 Pasang kaca bening 5 mm SNI : 2002


BAHAN 1.1000 m2 Kaca bening 5 mm Rp 275,000.00 Rp 302,500.00
0.015 OH Pekerja Rp 100,000.00 Rp 1,500.00
0.150 OH Tukang kayu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.00075 OH Mandor Rp 170,000.00 Rp 127.50
JUMLAH Rp 320,552.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 320,552.50

1 m2 Pasang kaca reyben 5 mm SNI : 2002


BAHAN 1.1000 m2 Kaca reyben 5 mm Rp 325,000.00 Rp 357,500.00
0.015 OH Pekerja Rp 100,000.00 Rp 1,500.00
0.150 OH Tukang kayu Rp 95,000.00 Rp 14,250.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.00075 OH Mandor Rp 170,000.00 Rp 127.50
JUMLAH Rp 375,552.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 375,552.50

1 buah Pasang kunci tanam bulat (kamar mandi) SNI : 2002


BAHAN 1.0000 bh Kunci tanam bulat Rp 150,000.00 Rp 150,000.00
0.010 OH Pekerja Rp 100,000.00 Rp 1,000.00
0.500 OH Tukang kayu Rp 95,000.00 Rp 47,500.00
TENAGA
0.010 OH Kepala Tukang Rp 145,000.00 Rp 1,450.00
0.005 OH Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 200,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 200,800.00
PEKERJAAN CAT

1 m2 Mengecat bidang kayu lama SNI : 2002


0.1500 kg Plamir Rp 55,000.00 Rp 8,250.00
BAHAN 0.1700 kgl Cat dasar Rp 80,000.00 Rp 13,600.00
0.1700 kgl Cat penutup Rp 80,000.00 Rp 13,600.00
0.070 OH Pekerja Rp 100,000.00 Rp 7,000.00
0.075 OH Tukang cat Rp 95,000.00 Rp 7,125.00
TENAGA
0.008 OH Kepala Tukang Rp 145,000.00 Rp 1,087.50
0.0025 OH Mandor Rp 170,000.00 Rp 425.00
JUMLAH Rp 51,087.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 51,087.50

1 m2 Mengecat bidang kayu baru SNI : 2002


0.2000 kgl Cat meni Rp 85,000.00 Rp 17,000.00
0.1500 kg Plamir Rp 55,000.00 Rp 8,250.00
BAHAN
0.1700 kgl Cat dasar Rp 80,000.00 Rp 13,600.00
0.2600 kgl Cat penutup Rp 80,000.00 Rp 20,800.00
0.070 OH Pekerja Rp 100,000.00 Rp 7,000.00
0.009 OH Tukang cat Rp 95,000.00 Rp 855.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 870.00
0.0025 OH Mandor Rp 170,000.00 Rp 425.00
JUMLAH Rp 68,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 68,800.00

1 m2 Mengecat bidang tembok lama SNI : 2002


0.1200 kgl Cat dasar Rp 105,000.00 Rp 12,600.00
BAHAN
0.1800 kgl Cat penutup Rp 85,000.00 Rp 15,300.00
0.028 OH Pekerja Rp 100,000.00 Rp 2,800.00
0.042 OH Tukang cat Rp 95,000.00 Rp 3,990.00
TENAGA
0.004 OH Kepala Tukang Rp 145,000.00 Rp 609.00
0.0025 OH Mandor Rp 170,000.00 Rp 425.00
JUMLAH Rp 35,724.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 35,724.00

1 m2 Mengecat bidang tembok baru SNI : 2002


0.1000 kg Plamir Rp 60,000.00 Rp 6,000.00
BAHAN 0.1000 kgl Cat dasar Rp 105,000.00 Rp 10,500.00
0.2600 kgl Cat penutup Rp 85,000.00
Rp 22,100.00
0.020 OH Pekerja Rp 100,000.00
Rp 2,000.00
0.063 OH Tukang cat Rp 95,000.00
Rp 5,985.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00
Rp 913.50
0.0025 OH Mandor Rp 170,000.00
Rp 425.00
JUMLAH Rp 47,923.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 47,923.50

1 m2 Mengecat plafon eternit/ gypsum SNI : 2002


0.1200 kgl Cat dasar Rp 105,000.00 Rp 12,600.00
BAHAN
0.1800 kgl Cat penutup Rp 85,000.00 Rp 15,300.00
0.028 OH Pekerja Rp 100,000.00 Rp 2,800.00
0.042 OH Tukang cat Rp 95,000.00 Rp 3,990.00
TENAGA
0.004 OH Kepala Tukang Rp 145,000.00 Rp 609.00
0.0025 OH Mandor Rp 170,000.00 Rp 425.00
JUMLAH Rp 35,724.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 35,724.00
1 m2 Mengecat genteng SNI : 2002
BAHAN 0.2600 kgl Cat genteng Rp 80,000.00 Rp 20,800.00
0.020 OH Pekerja Rp 100,000.00
Rp 2,000.00
0.063 OH Tukang cat Rp 95,000.00
Rp 5,985.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00
Rp 913.50
0.0025 OH Mandor Rp 170,000.00
Rp 425.00
JUMLAH Rp 30,123.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 30,123.50

1 m2 Pengikisan dan pengerokan permukaan cat lama SNI : 2002


BAHAN 0.050 kg Soda api Rp 55,000.00
Rp 2,750.00
0.150 OH Pekerja Rp 100,000.00
Rp 15,000.00
TENAGA
0.003 OH Mandor Rp 170,000.00
Rp 510.00
JUMLAH Rp 18,260.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 18,260.00

1 m2 Pencucian bidang permukaan tembok yang pernah dicat SNI : 2002


BAHAN 0.050 kg sabun Rp 35,000.00 Rp 1,750.00
0.150 OH Pekerja Rp 100,000.00 Rp 15,000.00
TENAGA
0.003 OH Mandor Rp 170,000.00 Rp 510.00
JUMLAH Rp 17,260.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 17,260.00

1 m2 Pengecatan bidang kayu baru (1x plamir, 1x cat dasar, 2x cat


SNI : 2002
penutup)
0.200 kg Cat meni Rp 85,000.00
Rp 17,000.00
0.150 kg Plamir Rp 55,000.00
Rp 8,250.00
0.170 Kg Cat dasar Rp 80,000.00
Rp 13,600.00
BAHAN 0.260 Kg Cat penutup Rp 80,000.00
Rp 20,800.00
0.010 bh Kwas Rp 25,000.00
Rp 250.00
0.030 kgl pengencer / tinner Rp 15,000.00
Rp 450.00
0.200 Lbr Ampelas Rp 15,000.00
Rp 3,000.00
0.070 OH Pekerja Rp 100,000.00
Rp 7,000.00
0.090 OH Tukang cat Rp 95,000.00
Rp 8,550.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00
Rp 870.00
0.003 OH Mandor Rp 170,000.00
Rp 510.00
JUMLAH Rp 80,280.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 80,280.00

1 m2 Pengecatan bidang kayu baru (1x plamir, 1x cat dasar, 3x cat


SNI : 2002
penutup)
0.200 kg Cat meni Rp 85,000.00
Rp 17,000.00
0.150 kg Plamir Rp 55,000.00
Rp 8,250.00
0.170 Kg Cat dasar Rp 80,000.00
Rp 13,600.00
BAHAN 0.350 Kg Cat penutup Rp 80,000.00
Rp 28,000.00
0.010 bh Kwas Rp 25,000.00
Rp 250.00
0.030 kgl pengencer / tinner Rp 15,000.00
Rp 450.00
0.200 Lbr Ampelas Rp 15,000.00
Rp 3,000.00
0.070 OH Pekerja Rp 100,000.00
Rp 7,000.00
0.105 OH Tukang cat Rp 95,000.00
Rp 9,975.00
TENAGA
0.004 OH Kepala Tukang Rp 145,000.00
Rp 580.00
0.003 OH Mandor Rp 170,000.00
Rp 510.00
JUMLAH Rp 88,615.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 88,615.00
1 m2 Pelaburan bidang kayu dengan teak oil SNI : 2002
BAHAN 0.3600 kgl Teak oil Rp 90,000.00 Rp 32,400.00
0.040 OH Pekerja Rp 100,000.00 Rp 4,000.00
0.063 OH Tukang cat Rp 95,000.00
Rp 5,985.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00
Rp 913.50
0.0025 OH Mandor Rp 170,000.00
Rp 425.00
JUMLAHRp 43,723.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 43,723.50

1 m2 Pelaburan bidang kayu dengan politur SNI : 2002


0.1500 kgl Politur Rp 90,000.00 Rp 13,500.00
BAHAN 0.3720 kgl Politur jadi Rp 95,000.00 Rp 35,340.00
2.0000 lbr Ampelas Rp 15,000.00 Rp 30,000.00
0.040 OH Pekerja Rp 100,000.00 Rp 4,000.00
0.060 OH Tukang cat Rp 95,000.00 Rp 5,700.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 870.00
0.0030 OH Mandor Rp 170,000.00 Rp 510.00
JUMLAH Rp 89,920.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 89,920.00

1 m2 Pelaburan kayu dengan cat residu dan ter SNI : 2002


BAHAN 0.350 kgl Residu / ter Rp 15,000.00 Rp 5,250.00
0.100 OH Pekerja Rp 100,000.00 Rp 10,000.00
TENAGA
0.006 OH Mandor Rp 170,000.00 Rp 1,020.00
JUMLAH Rp 16,270.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 16,270.00

1 m2 Pelaburan bidang kayu dengan vernis SNI : 2002


0.1500 kgl Vernis Rp 90,000.00 Rp 13,500.00
BAHAN 0.0500 kg dempul Rp 75,000.00 Rp 3,750.00
0.1000 lbr Ampelas Rp 15,000.00 Rp 1,500.00
0.160 OH Pekerja Rp 100,000.00 Rp 16,000.00
0.160 OH Tukang cat Rp 95,000.00 Rp 15,200.00
TENAGA
0.016 OH Kepala Tukang Rp 145,000.00 Rp 2,320.00
0.0030 OH Mandor Rp 170,000.00 Rp 510.00
JUMLAH Rp 52,780.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 52,780.00

1 m2 Pengecatan bidang tembok baru (1x plamir, 1x cat dasar, 2x cat


SNI : 2002
penutup)
0.1000 kg Plamir Rp 60,000.00 Rp 6,000.00
BAHAN 0.1000 kg Cat dasar Rp 105,000.00 Rp 10,500.00
0.2600 kg Cat penutup Rp 85,000.00 Rp 22,100.00
0.020 OH Pekerja Rp 100,000.00 Rp 2,000.00
0.063 OH Tukang cat Rp 95,000.00 Rp 5,985.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 913.50
0.0025 OH Mandor Rp 170,000.00 Rp 425.00
JUMLAH Rp 47,923.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 47,923.50
1 m2 Pengecatan bidang tembok lama (1x cat dasar, 2x cat penutup) SNI : 2002

BAHAN 0.1200 kg Cat dasar Rp 105,000.00 Rp 12,600.00


0.1800 kg Cat penutup Rp 85,000.00
Rp 15,300.00
0.028 OH Pekerja Rp 100,000.00
Rp 2,800.00
0.042 OH Tukang cat Rp 95,000.00
Rp 3,990.00
TENAGA
0.004 OH Kepala Tukang Rp 145,000.00
Rp 609.00
0.0030 OH Mandor Rp 170,000.00
Rp 510.00
JUMLAH Rp 35,809.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 35,809.00

1 m2 Pengecatan bidang plafond baru (1x plamir, 1x cat dasar, 2x cat


SNI : 2002
penutup)
0.1000 kg Plamir Rp 60,000.00 Rp 6,000.00
BAHAN 0.1000 kg Cat dasar Rp 105,000.00 Rp 10,500.00
0.2600 kg Cat penutup Rp 85,000.00 Rp 22,100.00
0.020 OH Pekerja Rp 100,000.00 Rp 2,000.00
0.063 OH Tukang cat Rp 95,000.00 Rp 5,985.00
TENAGA
0.006 OH Kepala Tukang Rp 145,000.00 Rp 913.50
0.0025 OH Mandor Rp 170,000.00 Rp 425.00
JUMLAH Rp 47,923.50
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 47,923.50
O. PEKERJAAN LINGKUNGAN

1 m1 Memasang got U - 20 cm SNI : ……………………….


0.0060 m3 Pas. Bata merah 1PC : 4 Ps Rp 313,179.00 Rp 1,879.07
BAHAN
1.0000 bh Got -U 20 Rp 120,000.00 Rp 120,000.00
TENAGA 0.700 OH Pekerja Rp 100,000.00 Rp 70,000.00
JUMLAH Rp 191,879.07
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 191,879.07

1 m2 Memasang conblok, tebal 6 cm SNI :……………………………


1.0500 m2 Conblock Rp 225,000.00 Rp 236,250.00
BAHAN
0.1200 m3 Pasir Pasang Rp 600,000.00 Rp 72,000.00
0.240 OH Pekerja Rp 100,000.00 Rp 24,000.00
0.080 OH Tukang batu Rp 95,000.00 Rp 7,600.00
TENAGA
0.008 OH Kepala Tukang Rp 145,000.00 Rp 1,160.00
0.012 OH Mandor Rp 170,000.00 Rp 2,040.00
JUMLAH Rp 343,050.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 343,050.00

1 m2 Memasang conblok, tebal 8 cm SNI :……………………………


1.0500 m2 Conblock Rp 240,000.00 Rp 252,000.00
BAHAN
0.1200 m3 Pasir Pasang Rp 600,000.00
Rp 72,000.00
0.240 OH Pekerja Rp 100,000.00
Rp 24,000.00
0.080 OH Tukang batu Rp 95,000.00
Rp 7,600.00
TENAGA
0.008 OH Kepala Tukang Rp 145,000.00
Rp 1,160.00
0.012 OH Mandor Rp 170,000.00
Rp 2,040.00
JUMLAH Rp 358,800.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 358,800.00

1 m2 Memasang Paving block SNI :……………………………


50.00 bh paving block Rp 4,800.00 Rp 240,000.00
BAHAN
0.0550 m3 Pasir Pasang Rp 600,000.00 Rp 33,000.00
0.250 OH Pekerja Rp 100,000.00 Rp 25,000.00
0.250 OH Tukang batu Rp 95,000.00 Rp 23,750.00
TENAGA
0.025 OH Kepala Tukang Rp 145,000.00 Rp 3,625.00
0.013 OH Mandor Rp 170,000.00 Rp 2,125.00
JUMLAH Rp 327,500.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 327,500.00
PEKERJAAN ME

1 titik Pasang Stop kontak SNI : ……………………..


10.000 m' Kabel NYA 1 x 2,5 mm Rp 12,000.00 Rp 120,000.00
BAHAN 1.200 btg Pipa pralon 5/8" Rp 90,000.00
Rp 108,000.00
1.000 bh Stop kontak + indoos Rp 50,000.00
Rp 50,000.00
0.050 OH Pekerja Rp 100,000.00
Rp 5,000.00
TENAGA 0.500 OH Tukang listrik Rp 95,000.00
Rp 47,500.00
0.050 OH Kepala Tukang Rp 145,000.00
Rp 7,250.00
JUMLAH Rp 337,750.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 337,750.00

1 titik Pasang Saklar tunggal SNI : ……………………..


10.000 m' Kabel NYA 1 x 2,5 mm Rp 12,000.00 Rp 120,000.00
BAHAN 2.000 btg Pipa pralon 5/8" Rp 90,000.00 Rp 180,000.00
1.000 bh Saklar tunggal + indoos Rp 50,000.00 Rp 50,000.00
TENAGA 0.050 OH Tukang listrik Rp 95,000.00 Rp 4,750.00
JUMLAH Rp 354,750.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 354,750.00

1 titik Pasang Saklar ganda SNI : ……………………..


18.000 m' Kabel NYA 1 x 2,5 mm Rp 12,000.00
Rp 216,000.00
BAHAN 2.000 btg Pipa pralon 5/8" Rp 90,000.00
Rp 180,000.00
1.000 bh Saklar ganda Rp 75,000.00
Rp 75,000.00
TENAGA 0.050 OH Tukang listrik Rp 95,000.00
Rp 4,750.00
JUMLAH Rp 475,750.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 475,750.00

1 buah Pasang Lampu TL 20 watt SNI : ……………………..


BAHAN 1.000 bh Lampu TL 20 watt Rp 120,000.00 Rp 120,000.00
0.010 OH Pekerja Rp 100,000.00 Rp 1,000.00
TENAGA 0.020 OH Tukang listrik Rp 95,000.00 Rp 1,900.00
0.005 OH Kepala Tukang Rp 145,000.00 Rp 725.00
JUMLAH Rp 123,625.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 123,625.00

1 buah Pasang Lampu TL 18 watt SNI : ……………………..


1.000 bh Lampu TL 18 watt Rp 80,000.00 Rp 80,000.00
BAHAN
1.000 bh Fiting keramik Rp 55,000.00
Rp 55,000.00
0.010 OH Pekerja Rp 100,000.00
Rp 1,000.00
TENAGA 0.020 OH Tukang listrik Rp 95,000.00
Rp 1,900.00
0.005 OH Kepala Tukang Rp 145,000.00
Rp 725.00
JUMLAH Rp 138,625.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 138,625.00

1 buah Pasang Lampu Pijar 25 watt SNI : ……………………..


1.000 bh Lampu pijar 25 watt Rp 65,000.00 Rp 65,000.00
BAHAN
1.000 bh Fiting keramik Rp 55,000.00 Rp 55,000.00
0.010 OH Pekerja Rp 100,000.00 Rp 1,000.00
TENAGA 0.020 OH Tukang listrik Rp 95,000.00 Rp 1,900.00
0.005 OH Kepala Tukang Rp 145,000.00 Rp 725.00
JUMLAH Rp 123,625.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 123,625.00

1 buah Pasang Panel box + MCB SNI : ……………………..


1.000 bh Panel Box + MCB 6 ampere Rp 185,000.00 Rp 185,000.00
BAHAN 12.000 m' Kabel NYA 1 x 2,5 mm Rp 12,000.00 Rp 144,000.00
1.000 bh Isolasi Rp 20,000.00 Rp 20,000.00
1.000 OH Pekerja Rp 100,000.00 Rp 100,000.00
TENAGA 1.000 OH Tukang listrik Rp 95,000.00 Rp 95,000.00
0.005 OH Kepala Tukang Rp 145,000.00 Rp 725.00
JUMLAH Rp 544,725.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 544,725.00
Q. PEKERJAAN BONGKARAN

1 m3 Membongkar beton bertulang SNI : 2002


6.667 OH Pekerja Rp 100,000.00 Rp 666,700.00
TENAGA
0.333 OH Mandor Rp 170,000.00 Rp 56,610.00
JUMLAH Rp 723,310.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 723,310.00

1 m3 Membongkar dinding tembok bata merah SNI Rev. : 2005


2.000 OH Pekerja Rp 100,000.00 Rp 200,000.00
TENAGA
0.090 OH Mandor Rp 170,000.00 Rp 15,300.00
JUMLAH Rp 215,300.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 215,300.00

1 m2 Membongkar plesteran dinding SNI Rev. : 2005


0.050 OH Pekerja Rp 100,000.00 Rp 5,000.00
TENAGA
0.025 OH Mandor Rp 170,000.00 Rp 4,250.00
JUMLAH Rp 9,250.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 9,250.00

1 m2 Membongkar genteng dipakai lagi SNI Rev. : 2005


0.040 OH Pekerja Rp 100,000.00 Rp 4,000.00
TENAGA
0.020 OH Mandor Rp 170,000.00 Rp 3,400.00
JUMLAH Rp 7,400.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 7,400.00

1 m2 Membongkar reng/kaso-kaso dipakai lagi SNI Rev. : 2005


0.050 Oh Pekerja Rp 100,000.00 Rp 5,000.00
0.200 Oh Tukang kayu Rp 95,000.00 Rp 19,000.00
TENAGA
0.005 Oh Kepala Tukang Rp 145,000.00 Rp 725.00
0.010 Oh Mandor Rp 170,000.00 Rp 1,700.00
JUMLAH Rp 26,425.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 26,425.00

1 m3 Membongkar kuda-kuda/gording dipakai lagi SNI Rev. : 2005


6.000 Oh Pekerja Rp 100,000.00 Rp 600,000.00
4.000 Oh Tukang kayu Rp 95,000.00 Rp 380,000.00
TENAGA
0.600 Oh Kepala Tukang Rp 145,000.00 Rp 87,000.00
0.200 Oh Mandor Rp 170,000.00 Rp 34,000.00
JUMLAH Rp 1,101,000.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 1,101,000.00

1 m2 Membongkar rangka plafon dipakai lagi SNI Rev. : 2005


0.100 Oh Pekerja Rp 100,000.00 Rp 10,000.00
0.250 Oh Tukang kayu Rp 95,000.00 Rp 23,750.00
TENAGA
0.015 Oh Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.005 Oh Mandor Rp 170,000.00 Rp 850.00
JUMLAH Rp 36,775.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 36,775.00
Q. PEKERJAAN PASANGAN CERUCUK KAYU BULAT DIA. 10 - 15 (panjang 3 - 4 meter)
1 m1 Memasang Cerucuk Kayu Bulat SNI : 2002
1.000 Btg Kayu Bulat Cerucuk dia. 10-15 cm Rp 95,000.00 Rp 95,000.00
BAHAN
0.120 Ls Alat Bantu Rp 10,000.00 Rp 1,200.00
0.045 OH Pekerja Rp 100,000.00 Rp 4,500.00
0.012 OH Tukang Kayu Rp 95,000.00 Rp 1,140.00
TENAGA
0.015 OH Kepala Tukang Rp 145,000.00 Rp 2,175.00
0.006 OH Mandor Rp 170,000.00 Rp 1,020.00
JUMLAH Rp 105,035.00
OVERHEAD & PROFIT 0% Rp -
HARGA SATUAN Rp 105,035.00

1 m2 Memasang Geobag Pasir/Tanah SNI : 2002


BAHAN 7.500 m2 Geotekstil Err:509 Err:509
0.045 OH Pekerja Rp 100,000.00 Rp 4,500.00
TENAGA
0.006 OH Mandor Rp 170,000.00 Rp 1,020.00
JUMLAH Err:509
OVERHEAD & PROFIT 0% Err:509
HARGA SATUAN Err:509