Anda di halaman 1dari 11

GAMBAR RENCANA

PEMBANGUNAN LABORATORIUM
BIOLOGI
SMK NEGERI 1 TELEN

LOKASI :
KABUPATEN KUTAI TIMUR
TAHUN ANGGARAN 2023
PEMBANGUNAN LABORATORIUM
BIOLOGI
SMK NEGERI 1 TELEN
PEMBANGUNAN LABORATORIUM
BIOLOGI
SMK NEGERI 1 TELEN
PEMERINTAH PROVINSI
KALIMANTAN TIMUR

DINAS PENDIDIKAN DAN


KEBUDAYAAN

PEKERJAAN

PEMBANGUNAN
LABORATORIUM BIOLOGI

JUDUL GAMBAR

DENAH

SKALA NO.LEMBAR

1:100 A4.02

MENGETAHUI/MENYETUJUI

KEPALA SMK NEGERI 1 TELEN

Kebing, S.Pd
NIP.196606062006041023

KETUA PANTIA

Yoseph Matheus R, S.Fil


NIP. 197606042010011017

PERENCANA

KETERANGAN
PEMERINTAH PROVINSI
KALIMANTAN TIMUR

DINAS PENDIDIKAN DAN


KEBUDAYAAN

PEKERJAAN

PEMBANGUNAN RUANG
LABORATORIUM BIOLOGI

JUDUL GAMBAR

TAMPAK DEPAN TAMPAK


BELAKANG

SKALA NO.LEMBAR

1:100 A4.03

MENGETAHUI/MENYETUJUI

KEPALA SMK NEGERI 1 TELEN

Kebing, S.Pd
NIP.196606062006041023

KETUA PANTIA

Yoseph Matheus R, S.Fil


NIP. 197606042010011017

PERENCANA

KETERANGAN
PEMERINTAH PROVINSI
KALIMANTAN TIMUR

DINAS PENDIDIKAN DAN


KEBUDAYAAN

PEKERJAAN

PEMBANGUNAN RUANG
LABORATORIUM BIOLOGI

JUDUL GAMBAR

TAMPAK SAMPING

SKALA NO.LEMBAR

1:100 A4.04

MENGETAHUI/MENYETUJUI

KEPALA SMK NEGERI 1 TELEN

Kebing, S.Pd
NIP.196606062006041023

KETUA PANTIA

Yoseph Matheus R, S.Fil


NIP. 197606042010011017

PERENCANA

KETERANGAN
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN LABORATORIUM
BIOLOGI
SMK NEGERI 1 TELEN

LOKASI :
KABUPATEN KUTAI TIMUR
TAHUN ANGGARAN 2023
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN LABORATORIUM BIOLOGI (15 X 10 meter)


LOKASI : SMK NEGERI 1TELEN
KABUPATEN : KUTAI TIMUR
PROVINSI : KALIMANTAN TIMUR
TAHUN ANGGARAN : 2023

HARGA SATUAN JUMLAH HARGA


NO. UARAIAN PEKERJAAN VOLUME SATUAN
(Rp.) (Rp.)
A PEKERJAAN BANGUNAN
I PEKERJAAN PERSIAPAN
1 Pengukuran+Pasangan Bouwplank 54.00 M1 79,560.00 4,296,240.00
Sub Jumlah 4,296,240.00
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi 14.04 M3 130,500.00 1,832,220.00
2 Pancang ulin 10 x 10 - 150 cm 30.00 Ttk 167,500.00 5,025,000.00
3 Urugan Pasir Bawah Pondasi 0.30 M3 85,500.00 25,650.00
4 Lantai kerja tebal 5 cm 0.30 M3 1,214,000.00 364,200.00
5 Pondasi plat setempat 2.95 M3 7,105,562.35 20,961,408.93
6 Kolom pondasi 20 x 20 cm 2.97 M3 7,105,562.35 21,103,520.18
7 Urugan tanah kembali 14.04 M3 36,250.00 508,950.00
8 Urugan tanah peninggian dasar lantai 41.00 M3 47,400.00 1,943,400.00
Sub Jumlah 51,764,349.11
III PEKERJAAN STRUKTUR
1 Beton Sloof 20 x 40 cm 8.95 M3 7,105,562.35 63,594,783.03
2 Kolom praktis 13 x 15 cm 4.30 M3 7,315,760.34 31,457,769.46
3 Ringbalk beton 13 x 20 cm 3.46 M3 6,882,522.14 23,813,526.60
Sub Jumlah 118,866,079.10
IV PEKERJAAN DINDING DAN PLESTERAN
1 Dinding Batu Bata Camp. 1Pc : 2Ps 36.00 M2 268,185.00 9,654,660.00
2 Dinding Batu Bata Camp. 1Pc : 4Ps 178.00 M2 260,625.00 46,391,250.00
3 Plesteran Camp. 1Pc : 2Ps 92.00 M2 62,091.20 5,712,390.40
4 Plesteran Camp. 1Pc : 4Ps 396.00 M2 58,612.00 23,210,352.00
5 Acian plesteran 488.00 M2 35,925.00 17,531,400.00
Sub Jumlah 102,500,052.40
V PEKERJAAN KUSEN, PINTU & JENDELA
1 Kusen kayu 125.95 M1 80,445.00 10,132,047.75
2 Pintu kayu 4.00 Unit 700,000.00 2,800,000.00
3 Jendela kaca 10.00 Unit 375,000.00 3,750,000.00
4 Kaca Mati 5 mm + lis 3.36 M2 280,000.00 940,800.00
5 Engsel pintu 4 " 15.00 Bh 72,975.00 1,094,625.00
6 Engsel Jendela 3 " 20.00 Bh 53,650.00 1,073,000.00
7 Kunci pintu 2.00 Bh 265,650.00 531,300.00
8 Grendel pintu 2.00 Bh 62,975.00 125,950.00
9 Grendel jendela 10.00 Bh 62,975.00 629,750.00
10 Hak angin jendela 20.00 Bh 47,975.00 959,500.00
Sub Jumlah 22,036,972.75
VI PEKERJAAN ATAP DAN PLAFOND
1 Kuda kuda rangka atap baja ringan 190.00 M2 182,000.00 34,580,000.00
2 Atap metal 190.00 M2 137,879.85 26,197,171.50
3 Bubungnan metal 17.00 M1 87,500.00 1,487,500.00
4 Lisplang GRC L 20 cm 34.00 M1 66,450.00 2,259,300.00
5 Plafond GRC 4 mm + rangka baja ringan 130.00 M2 161,932.60 21,051,238.00
6 Lis plafond kayu 110.00 M1 33,000.00 3,630,000.00
Sub Jumlah 89,205,209.50
VII PEKERJAAN PENUTUP LANTAI
1 Beton dasar lantai dan rabat 6.00 M3 1,214,000.00 7,284,000.00
2 Keramik Lantai 40 x 40 cm 150.00 M2 182,969.00 27,445,350.00
Sub Jumlah 34,729,350.00
VIII PEKERJAAN SANITAIR
1 Membuat meja beton lapis keramik 8.00 M1 375,000.00 3,000,000.00
2 Bak cuci tangan 2.00 Bh 750,000.00 1,500,000.00
3 Membuat parit beton lebar 25 cm 10.00 M1 85,000.00 850,000.00
Sub Jumlah 5,350,000.00
IX PEKERJAAN LISTRIK DAN ME
1 Instalasi Titik Lampu 5.00 Ttk 347,260.00 1,736,300.00
2 Instalasi Stop Kontak 9.00 Ttk 239,200.00 2,152,800.00
3 Fiting + lampu 11 watt 5.00 Ttk 74,425.00 372,125.00
4 Saklar Tungal 3.00 Ttk 76,710.00 230,130.00
5 Saklar Ganda 1.00 Ttk 74,425.00 74,425.00
6 Box breaker 1.00 Unit 550,000.00 550,000.00
Sub Jumlah 5,115,780.00
X PEKERJAAN PENGECATAN
1 Cat Plafond 130.00 M2 24,286.20 3,157,206.00
2 Cat lisplang 10.40 M2 40,845.84 424,796.74
3 Cat Kusen, pintu dan jendela 63.00 M2 48,000.00 3,024,000.00
3 Cat Dinding Tembok Luar 138.00 M2 40,845.84 5,636,725.92
4 Cat Dinding Tembok dalam 412.30 M2 24,286.20 10,013,200.26
Sub Jumlah 22,255,928.92
XI PENGADAAN MEUBELER
1 Meja laboratorium 2.00 bh 2,500,000.00 5,000,000.00
2 Kursi laboratorium ( 1 meja lab, 6 kursi lab ) 18.00 bh 1,523,500.00 27,423,000.00
3 Meja Guru 1.00 bh 1,750,000.00 1,750,000.00
4 Kursi Guru 1.00 bh 950,000.00 950,000.00
5 Meja demonstrasi 1.00 bh 2,250,000.00 2,250,000.00
6 Papan Tulis 1.00 bh 1,200,000.00 1,200,000.00
7 Lemari penyimpanan alat 1.00 bh 2,200,000.00 2,200,000.00
8 Lemari Penyimpanan bahan 1.00 bh 3,500,000.00 3,500,000.00
9 Tempat Sampah 2.00 bh 250,000.00 500,000.00
Sub Jumlah 44,773,000.00

Kutai Timur, 22 Juni 2022


Kepala Sekolah,

Kebing, S.Pd
NIP. 196606062006041023
REKAPITULASI

PEKERJAAN : PEMBANGUNAN LABORATORIUM BIOLOGI (15 X 10 meter)


LOKASI : SMK NEGERI 1 TELEN
KABUPATEN : KUTAI TIMUR
PROVINSI : KALIMANTAN TIMUR
TAHUN ANGGARAN : 2023

NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

I PEKERJAAN PERSIAPAN 4,296,240.00

II PEKERJAAN PONDASI 51,764,349.11

III PEKERJAAN STRUKTUR 118,866,079.10

IV PEKERJAAN KUSEN, PINTU & JENDELA 102,500,052.40

V PEKERJAAN KUSEN, PINTU & JENDELA 22,036,972.75

VI PEKERJAAN PENUTUP LANTAI 89,205,209.50

VII PEKERJAAN PENUTUP LANTAI 34,729,350.00

VIII PEKERJAAN SANITAIR 5,350,000.00

IX PEKERJAAN LISTRIK DAN ME 5,115,780.00

X PEKERJAAN PENGECATAN 22,255,928.92

XI PENGADAAN MEUBELER 44,773,000.00

JUMLAH 500,892,961.78

JUMLAH DIBULATKAN 500,893000,00

Terbilang : # Lima Ratus Juta Delapan Ratus Sembilan Puluh Tiga Ribu Rupiah #

Kutai Timur, 22 Juni 2022


Kepala Sekolah,

Kebing, S.Pd
NIP. 196606062006041023