Anda di halaman 1dari 37

DAFTAR HARGA BAHAN DAN UPAH PEKERJA

#NAME? : #NAME?
0 : 0
Pekerjaan : PEMBUATAN LANTAI JEMUR GABAH
Lokasi : Kab. Bengkulu Tengah Propinsi Bengkulu
#NAME? : #NAME?
Tahun Anggaran : 2022

UPAH PEKERJA
1 Pekerja 75,000.00 /hari
2 Tukang Gali 85,000.00 /hari
3 Tukang Batu 85,000.00 /hari
4 Tukang Kayu 85,000.00 /hari
5 Tukang Besi 85,000.00 /hari
6 Tukang Cat 85,000.00 /hari
7 KepalaTukang 110,000.00 /hari
8 Mandor 100,000.00 /hari
HARGABAHAN / METERIAL
A BAHAN BATU DAN PASIR
1 Tanah urug 65,000.00 /m3
2 Pasir urug 115,000.00 /m3
3 Pasir pasang 150,000.00 /m3
4 Pasir beton 155,000.00 /m3
5 Batu bata 600.00 /buah
6 Batu kali 200,000.00 /m3
7 Batu Tempel/Batu Alam 10,400.00 /buah
8 Batu Tempel Andesit 180,000.00 /m2
9 Sirtu 150,000.00 /m3
10 Koral 175,000.00 /m3
11 Split 1/2 - 2/3 335,000.00 /m3
12 Semen Portland 1,300.00 /kg
13 Semen putih/semen warna 2,600.00 /kg
14 Paving block 10 x 20 T. 6 cm 1,500.00 /buah
B HARGA BAHAN KAYU
1 Plywood 4 mm 65,000.00 /lbr
2 Plywood 6 mm 86,000.00 /lbr
3 Multyplek 9 mm 120,000.00 /lbr
4 GRC 6 mm 75,000.00 /lbr
5 Gypsum 9 mm 85,000.00 /lbr
6 Teakwood 3 mm 95,000.00 /lbr
7 Papan profil ( lambriziring ) 4,000,000.00 /m3
8 List Gypsum Profil 7 - 15 Cm 15,000.00 /m'
9 List Kayu Profil A 4 4,500.00 /m'
10 Kayu kelas lV ( bekisting ) 2,000,000.00 /m3
11 Kayu kelas III 2,500,000.00 /m3
12 Kayu kelas II 3,000,000.00 /m3
13 Kayu dolcen 10,000.00 /btg
14 Gyptile 35,000.00 /lbr
15 Maen tee PN 400 31,500.00 /btg
16 Cross Tee 120 PN 402 16,500.00 /btg
17 Wall Angle 20,500.00 /btg
18 Rod gantung @1m+Angle Clip+M.Tee Clip 7,500.00 /set
C HARGA BAHAN KACA DAN BESI
1 Kaca bening 5 mm 120,000.00 /m2
2 Kaca bening 8 mm 275,000.00 /m2
3 Kaca bening 12 mm 350,000.00 /m2
4 Besi Beton Polos 13,000.00 /kg
5 Besi Beton Ulir 13,000.00 /kg
6 Besi Profil 15,000.00 /kg
7 Besi Strip 15,000.00 /kg
8 Besi Siku L 30. 30. 3 100,000.00 /btg
9 Besi Siku L 30. 30. 3 12,254.90 /kg
10 Besi Siku L 40. 40. 4 80,000.00 /btg
11 Besi Siku L 50. 50. 5 200,000.00 /btg
12 Besi Siku L 60. 60. 6 350,000.00 /btg
13 Besi Siku L 70. 70. 7 450,000.00 /btg
14 Besi Plat Baja 122x244 2mm 650,000.00 /lbr
15 Besi Plat Baja t=2 mm, uk 4'x8' 13,930.56 /kg
16 Kawat Beton 20,000.00 /kg
17 Kawat las 25,000.00 /kg
18 Hollow Galvanis 2/4 dan 4/4 10,000.00 /m'
19 Profil Alluminium Pintu 4" 72,500.00 /m'
20 Profil Alluminium Jendela & Ventilasi 50,000.00 /m'
20 Alumunium Strip 40,000.00 /m'
21 Profil Kaca 60,000.00 /m'
22 Skrup Fixer 1,000.00 /buah
23 Paku halus 25,000.00 /kg
24 Paku atap genteng metal 75,000.00 /kg
25 Paku seng 30,000.00 /kg
26 Paku macam-macam ukuran 20,000.00 /kg
27 Paku sekrup 32,500.00 /kg
D HARGA BAHAN PENUTUP LANTAI
1 Keramik Lantai 40 x 40 cm 11,500.00 /buah
2 Keramik Lantai 40 x 40 cm ( anti slip ) 13,500.00 /buah
3 Keramik Lantai 30 x 30 cm 6,000.00 /buah
4 Keramik dinding 20 x 25 cm 3,500.00 /buah
5 Keramik Plin Dinding 10 x 40 cm 2,500.00 /buah
6 Keramik lantai 20 x 20 cm ( anti slip ) 2,800.00 /buah
7 Kuku Macan ( Kuku Keramik ) 10,000.00 /m'
8 Granit 40 x 40 cm 45,000.00 /buah
9 Granit 60 x 60 cm 72,500.00 /buah
10 Batu andesit 10 x 20 cm T= 1 cm 4,000.00 /buah
11 Batu andesit 10 x 20 cm T= 5 cm 4,500.00 /buah
12 Batu andesit 20 x 20 cm T= 1 cm 6,500.00 /buah
13 Batu Andesit Bintik Abu-Abu 120,000.00 /m2
E HARGA BAHAN PENUTUP ATAP
1 Genteng metal Colour T. 0.25 32,500.00 /bh
2 Genteng metal Colour Berpasir T. 0.25 47,500.00 /bh
3 Atap Zinkcalum Gelombang 85,500.00 /lbr
4 Nok Zinkcalum 65,000.00 /m
5 Flashing Zinkcalum 50,000.00 /m
6 Nok Atas Bulat genteng metal Colour 30,000.00 /bh
7 Nok Tepi Genteng Metal Colour 25,000.00 /bh
8 Nok Atas Bulat genteng metal Colour Berpasir 35,000.00 /bh
9 Nok Tepi Genteng Metal Colour Berpasir 30,000.00 /bh
10 Alumunium foil 35,000.00 /m2
11 Seng Alumunium 65,000.00 /lbr
12 Seng Gelombang Bjls 20 40,000.00 /lbr
13 Seng Plat Bjls 28 50,000.00 /lbr
F HARGA BAHAN KUNCI / PENGGANTUNG
1 Kunci Tanam Besar 175,000.00 /buah
2 Kunci Double Cylinder setara " Dekson " 165,000.00 /buah
3 Kunci Double Cylinder + Handle on Plate setara " Dekson " 185,000.00 /buah
4 Engsel Casement 10" setara " Dekson " 35,000.00 /pasang
5 Engsel Casement 16" setara " Dekson " 50,000.00 /pasang
6 Engsel Pintu Alumunium setara "Dekson" 22,500.00 /buah
7 Engsel Jendela setara "Dekson" 15,000.00 /buah
8 Ikatan Angin 10,000.00 /buah
9 Grendel Jendela 10,000.00 /buah
10 Tarikan Jendela 15,000.00 /buah
11 Handel Pintu Alumunium 40,000.00 /pasang
12 Handel Pintu Stainless Steel (Gagang Bulat P. 30 - 40 Cm) 105,000.00 /pasang
12 Doorcloser Pintu Alumunium setara " Dekson" 175,000.00 /buah
13 Floor Hingers setaraf " DORMA BTS.84 " lengkap Assesorisnya 1,750,000.00 /buah
14 Gerendel Pintu Tanam (Atas & Bawah) setara "Dekson" 62,500.00 /buah
15 Gerendel Pintu WC 15,000.00 /buah
15 Rambuncis Alumunium Setara " Dekson" 25,000.00 /buah
H HARGA BAHAN SANITASI /SANITAIR
1 Kloset Duduk setara American Standard 2,500,000.00 /set
2 Kloset Jongkok setara American standard 165,000.00 /set
3 Kran Air 27,500.00 /buah
4 Floor drain Steinless 65,000.00 /set
5 Roof Drain 95,000.00 /set
6 Kaca Cermin uk 800 x 1.200 250,000.00 /set
7 Kaca Cermin uk 1.200 x 1.200 mm 350,000.00 /set
8 Wastafel setara American standard 1,250,000.00 /set
9 Urinoir setara American standard 2,200,000.00 /set
10 Penyekat Porslin 650,000.00 /bh
11 Shower Dinding 200,000.00 /bh
12 Kitchen Sink single bowl 450,000.00 /buah
13 Bak Air fiber glass 350,000.00 /buah
14 Bak resevoir fibre galss Kap 1 M3 setara Tedmond 1,500,000.00 /buah
15 Bak resevoir fibre galss Kap 0.5 M3 setara Tedmond 850,000.00 /buah
16 Seal tape 3,500.00 /buah
17 Sealent 25,000.00 /tube
18 Pipa PVC 1/2" 5,000.00 /m'
19 Pipa PVC 3/4" 7,500.00 /m'
20 Pipa PVC 1" 8,500.00 /m'
21 Pipa PVC 1 1/2" 20,000.00 /m'
22 Pipa PVC 2" 25,000.00 /m'
23 Pipa PVC 3" 35,000.00 /m'
24 Pipa PVC 4" 58,000.00 /m'
25 Pipa Galvanis 1/2" 12,000.00 /m'
26 Pipa Galvanis 3/4" 15,000.00 /m'
27 Pipa Galvanis 1" 18,000.00 /m'
28 Pipa Galvanis 2" 32,500.00 /m'
29 Pipa Galvanis 3" 61,000.00 /m'
30 Pipa Galvanis 4" 84,000.00 /m'
31 Pompa Air Submersibre 15,000,000.00 /bh
32 Pompa Air Jet Pum 3,500,000.00 /bh
33 Ijuk 30,000.00 /kg
I HARGA BAHAN CAT ( PELAPIS )
1 Cat Dasar Kayu 30,000.00 /kg
2 Cat Kayu/Besi setara BEE BRAND 60,000.00 /kg
3 Cat Tembok dasar 20,000.00 /kg
4 Cat Plafond "setara Metrolit " 35,000.00 /kg
5 Cat Tembok ( interior ) setara dulux 90,000.00 /kg
6 Cat Tembok ( exterior/wheater shield ) setara Dulux 135,000.00 /kg
7 Cat Besi Anti Karat 60,000.00 /kg
8 Waterproofing 85,000.00 /kg
9 Base Epoxy Enamel 50,000.00 /kg
10 Top Coat Epoxy Enamel 80,000.00 /kg
11 Hardener u/ Epoxy Enamel 12,500.00 /kg
12 Politur 25,000.00 /ltr
13 Vernis 30,000.00 /ltr
14 Residu/Ter 15,000.00 /ltr
15 Dempul 30,000.00 /kg
16 Plamur 35,000.00 /kg
17 Amplas 7,500.00 /lbr
18 Meny Kayu 30,000.00 /kg
19 Meny Besi 30,000.00 /kg
20 Minyak cat 17,500.00 /ltr
21 Thinner 25,000.00 /ltr
22 Lem kayu 15,000.00 /kg
23 Compound 5,000.00 /kg
24 Solar 10,000.00 /liter
25 Minyak Pelumas 25,000.00 /liter
26 Minyak bekisting 5,000.00 /liter
REKAPITULASI
OWNER ESTIMATE ( O E )

Pekerjaan : PEMBUATAN LANTAI JEMUR GABAH

Lokasi : Kab. Bengkulu Tengah Propinsi Bengkulu

Tahun Anggaran : 2022

NO URAIAN PEKERJAAN JUMLAH ( Rp ) PPn 10% ( Rp ) Jumlah + PPn 10% ( Rp )

I PEKERJAAN PERSIAPAN Rp. 600,000.00 60,000.00 660,000.00

II PEKERJAAN TANAH DAN PASIR Rp. 572,244.75 57,224.48 629,469.23

III PEKERJAAN BETON Rp. 1,899,334.60 189,933.46 2,089,268.06

IV PEKERJAAN PASANGAN Rp. 6,083,450.87 608,345.09 6,691,795.95

V PEKERJAAN LAIN-LAIN Rp. 385,424.33 38,542.43 423,966.76

Jumlah Fisik……………………………………………. Rp. 9,540,454.55 954,045.45 10,494,500.00

Terbilang : Sepuluh Juta Empat Ratus Sembilan Puluh Empat Ribu Liam Ratus Rupiah

Bengkulu, Maret 2022

Disahkan Oleh :
Kepala Dinas Ketahanan Pangan Prov. BENGKULU
Selaku Pengguna Anggaran

SISARDI, MM
NIP. 19700215 199206 1 001
RENCANA ANGGARAN BIAYA

OWNER ESTIMATE ( O E )

Pekerjaan : PEMBUATAN LANTAI JEMUR GABAH


Lokasi : Kab. Bengkulu Tengah Propinsi Bengkulu

Tahun Anggaran : 2022

Harga Satuan Jumlah PPn 10% Jumlah + PPn


No. Uraian Pekerjaan Analisa Volume Sat
( Rp ) ( Rp ) ( Rp ) ( Rp )

I PEKERJAAN PERSIAPAN

1 Pek. Pengukuran/Pasangan Bauwplank Ls 1.00 Unit 150,000.00 150,000.00 15,000.00 165,000.00

2 Pas. Papan Nama Proyek ls 1.00 Unit 250,000.00 250,000.00 25,000.00 275,000.00

3 Biaya Administrasi / Astek ls 1.00 Unit 200,000.00 200,000.00 20,000.00 220,000.00

Sub. Jumlah I 600,000.00 660,000.00


II PEKERJAAN TANAH DAN PASIR

1 Pek. Galian Tanah Pondasi A.2.3.1.1 2.07 m3 86,625.00 179,313.75 17,931.38 197,245.13

2 Pek. Urugan Pasir Bawah Pondasi A.2.3.1.11 0.27 m3 207,900.00 56,133.00 5,613.30 61,746.30

3 Pek. Urugan Pasir Bawah Lantai A.2.3.1.11 1.62 m3 207,900.00 336,798.00 33,679.80 370,477.80

Sub. Jumlah II 572,244.75 629,469.23

III PEKERJAAN BETON


1 Pek. Beton Lantai Gudang 1:2:3 A.4.1.1.7 1.62 m3 1,172,428.77 1,899,334.60 189,933.46 2,089,268.06

Sub. Jumlah III 1,899,334.60 2,089,268.06

IV PEKERJAAN PASANGAN

1 Pek. Pasangan Batu Kali 1:4 A.3.2.1.2 3.00 m3 961,166.80 2,883,500.40 288,350.04 3,171,850.44

2 Pek. Plesteran 1 : 4 A.4.4.2.4 12.00 m2 72,204.26 866,451.17 86,645.12 953,096.28

3 Pek. Acian A.4.4.2.27 54.00 m2 43,212.95 2,333,499.30 233,349.93 2,566,849.23


Sub. Jumlah IV 6,083,450.87 6,691,795.95

V PEKERJAAN LAIN-LAIN

1 Pekerjaan Pembersihan Akhir Ls 1.00 Unit 385,424.33 385,424.33 38,542.43 423,966.76

Sub. Jumlah V 385,424.33 423,966.76


DAFTAR ANALISA
OWNER ESTIMATE ( O E )

Pekerjaan : PEMBUATAN LANTAI JEMUR GABAH


Lokasi : Kab. Bengkulu Tengah Propinsi Bengkulu
Tahun Anggaran : 2022

HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1 1m 3
Galian Tanah Biasa Sedalam 1 m' Rp 86,625.00
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.01 Oh 0.7500 100,000.00 75,000.00
Mandor L.04 Oh 0.0250 150,000.00 3,750.00
Jumlah Harga Tenaga Kerja 78,750.00
B Bahan

Jumlah Harga Bahan -


C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan ( A+B+C ) 78,750.00
E Overhead + Profil( Contoh 10 % ) 10% XD 7,875.00
F Harga Satuan Pekerjaan 86,625.00

A.2.3.1.2 1 m3 Galian Tanah Biasa Sedalam 2 m Rp 106,425.00


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.01 Oh 0.9000 100,000.00 90,000.00
Mandor L.04 Oh 0.0450 150,000.00 6,750.00
Jumlah Harga Tenaga Kerja 96,750.00
B Bahan

Jumlah Harga Bahan -


C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan ( A+B+C ) 96,750.00
E Overhead + Profil( Contoh 10 % ) 10% XD 9,675.00
F Harga Satuan Pekerjaan 106,425.00
A.2.3.1.9 1 m3 Pengurugan Kembali Galian Tanah Rp 63,250.00
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.01 Oh 0.5000 100,000.00 50,000.00
Mandor L.04 Oh 0.0500 150,000.00 7,500.00
Jumlah Harga Tenaga Kerja 57,500.00
B Bahan

Jumlah Harga Bahan -


C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan ( A+B+C ) 57,500.00
E Overhead + Profil( Contoh 10 % ) 10% XD 5,750.00
F Harga Satuan Pekerjaan 63,250.00

A.2.3.1.11 1 m3 Pengurugan Dengan Pasir Urung Rp 207,900.00


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.01 Oh 0.3000 100,000.00 30,000.00
Mandor L.04 Oh 0.0100 150,000.00 1,500.00
Jumlah Harga Tenaga Kerja 31,500.00
B Bahan
Pasir Urug m3 1.2000 131,250.00 157,500.00
Jumlah Harga Bahan 157,500.00
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan ( A+B+C ) 189,000.00
E Overhead + Profil( Contoh 10 % ) 10% XD 18,900.00
F Harga Satuan Pekerjaan 207,900.00
HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.2 1 m3 Pemasangan Pondasi Batu Bela/Batu Kali Campuran 1 Sp : 4 Pp Rp 961,166.80
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.01 Oh 1.5000 100,000.00 150,000.00
Tukang Batu L. 02 Oh 0.7500 125,000.00 93,750.00
Kepala Tukang L. 03 Oh 0.0750 130,000.00 9,750.00
Mandor L.04 Oh 0.0750 150,000.00 11,250.00
Jumlah Harga Tenaga Kerja 264,750.00
B Bahan
Batu Belah/Batu Kali m3 1.2000 250,000.00 300,000.00
Pasir Pasang m3 0.5200 210,000.00 109,200.00
Semen Portlan Kg 163.0000 1,226.00 199,838.00
Jumlah Harga Bahan 609,038.00
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan ( A+B+C ) 873,788.00
E Overhead + Profil( Contoh 10 % ) 10% XD 87,378.80
F Harga Satuan Pekerjaan 961,166.80

HARGA SATUAN PEKERJAAN BETON

A.4.1.1.7 1 m3 Membuat Beton Mutu f'c=19,3 MPa ( K 225 ) Slump (12 ± 2) cm, w/c=0,58 Rp 1,172,428.77
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.01 Oh 1.6500 100,000.00 165,000.00
Tukang Batu L. 02 Oh 0.2750 125,000.00 34,375.00
Kepala Tukang L. 03 Oh 0.0280 130,000.00 3,640.00
Mandor L.04 Oh 0.0830 150,000.00 12,450.00
Jumlah Harga Tenaga Kerja 215,465.00
B Bahan
Semen Portlan Kg 371.0000 1,226.00 454,846.00
Pasir Beton m3 0.4986 210,000.00 104,700.00
Kerikil ( Maks 30 mm) m3 0.7756 375,000.00 290,833.33
Air Liter 215.0000 - -
Jumlah Harga Bahan 850,379.33
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan ( A+B+C ) 1,065,844.33
E Overhead + Profil( Contoh 10 % ) 10% XD 106,584.43
F Harga Satuan Pekerjaan 1,172,428.77
A.4.1.1.8 1 m3 Membuat Beton Mutu f'c=19,3 MPa ( K 250 ) Slump (12 ± 2) cm, w/c=0,56 Rp 1,186,526.12
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.01 Oh 1.6500 100,000.00 165,000.00
Tukang Batu L. 02 Oh 0.2750 125,000.00 34,375.00
Kepala Tukang L. 03 Oh 0.0280 130,000.00 3,640.00
Mandor L.04 Oh 0.0830 150,000.00 12,450.00
Jumlah Harga Tenaga Kerja 215,465.00
B Bahan
Semen Portlan Kg 384.0000 1,226.00 470,784.00
Pasir Beton m3 0.4943 210,000.00 103,800.00
Kerikil ( Maks 30 mm) m3 0.7696 375,000.00 288,611.11
Air Liter 215.0000 - -
Jumlah Harga Bahan 863,195.11
C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan ( A+B+C ) 1,078,660.11
E Overhead + Profil( Contoh 10 % ) 10% XD 107,866.01
F Harga Satuan Pekerjaan 1,186,526.12

HARGA SATUAN PEKERJAAN PLASTERAN


A.4.4.2.2 1 m2 Pemasangan Plasteran Campuran 1 Sp : 2 Pp Tebal 15 mm Rp 76,653.09
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L. 01 Oh 0.3000 100,000.00 30,000.00
Tukang Batu L. 02 Oh 0.1500 125,000.00 18,750.00
Kepala Tukang L. 03 Oh 0.0150 130,000.00 1,950.00
Mandor L. 04 Oh 0.0150 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 52,950.00
B Bahan
Semen Portlan Kg 10.2240 1,226.00 12,534.62
Pasir Pasang m3 0.0200 210,000.00 4,200.00
Jumlah Harga Bahan 16,734.62
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan ( A+B+C ) 69,684.62
E Overhead + Profil( Contoh 10 % ) 10% XD 6,968.46
F Harga Satuan Pekerjaan 76,653.09
A.4.4.2.4 1 m2 Pemasangan Plasteran Campuran 1 Sp : 4 Pp Tebal 15 mm Rp 72,204.26
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L. 01 Oh 0.3000 100,000.00 30,000.00
Tukang Batu L. 02 Oh 0.1500 125,000.00 18,750.00
Kepala Tukang L. 03 Oh 0.0150 130,000.00 1,950.00
Mandor L. 04 Oh 0.0150 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 52,950.00
B Bahan
Semen Portlan Kg 6.2400 1,226.00 7,650.24
Pasir Pasang m3 0.0240 210,000.00 5,040.00
Jumlah Harga Bahan 12,690.24
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan ( A+B+C ) 65,640.24
E Overhead + Profil( Contoh 10 % ) 10% XD 6,564.02
F Harga Satuan Pekerjaan 72,204.26

A.4.4.2.27 1 m2 Pemasangan Acian Rp 43,212.95


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L. 01 Oh 0.2000 100,000.00 20,000.00
Tukang Batu L. 02 Oh 0.1000 125,000.00 12,500.00
Kepala Tukang L. 03 Oh 0.0100 130,000.00 1,300.00
Mandor L. 04 Oh 0.0100 150,000.00 1,500.00
Jumlah Harga Tenaga Kerja 35,300.00
B Bahan
Semen Portlan Kg 3.2500 1,226.00 3,984.50
Jumlah Harga Bahan 3,984.50
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan ( A+B+C ) 39,284.50
E Overhead + Profil( Contoh 10 % ) 10% XD 3,928.45
F Harga Satuan Pekerjaan 43,212.95
DAFTAR ANALISA PEKERJAAN BETON MUTU K. 175 & K.225

Pekerjaan : PEMBUATAN LANTAI JEMUR GABAH


Lokasi : Kab. Bengkulu Tengah Propinsi Bengkulu
Tahun Anggaran : 2022

Btn.P1 1 m3 Pekerjaan Beton Pondasi Plat 80 x 80 cm Err:509


Uraian Harga Satuan Jumlah
No Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7

Beton Mutu K 225 A.4.1.1.7 m3 1.000 Err:509 Err:509


Besi Beton Err:509 Kg 110.106 Err:509 Err:509
Kayu Begesting Err:509 m2 2.957 Err:509 Err:509

Jumlah Err:509

Btn.S2 1 m3 Pekerjaan Beton Sloof 15/20 cm Err:509


Uraian Harga Satuan Jumlah
No Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7

Beton Mutu K 175 Err:509 m3 1.0000 Err:509 Err:509


Besi Beton Err:509 Kg 110.8056 Err:509 Err:509
Kayu Begesting Err:509 m2 13.3333 Err:509 Err:509

Jumlah Err:509

Btn.K2 1 m3 Pekerjaan Beton Kolom 15/15 cm Err:509


No Uraian Kode Satuan Koefisien Harga Satuan Jumlah
( Rp ) ( Rp )
1 2 3 4 5 6 7

Beton Mutu K 225 A.4.1.1.7 m3 1.0000 Err:509 Err:509


Besi Beton Err:509 Kg 147.4778 Err:509 Err:509
Kayu Begesting Err:509 m2 13.3333 Err:509 Err:509

Jumlah Err:509
Btn.K3 1 m3 Pekerjaan Beton Kolom Praktis 13/13 cm Err:509
Uraian Harga Satuan Jumlah
No Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7

Beton Mutu K 175 Err:509 m3 1.0000 Err:509 Err:509


Besi Beton Err:509 Kg 210.2950 Err:509 Err:509
Kayu Begesting Err:509 m2 16.6667 Err:509 Err:509

Jumlah Err:509

Btn.Lt1 1 m3 Pekerjaan Beton Balok 15/15 cm Err:509


Uraian Harga Satuan Jumlah
No Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7

Beton Mutu K 175 Err:509 m3 1.0000 Err:509 Err:509


Besi Beton Err:509 Kg 215.6928 Err:509 Err:509
Kayu Begesting Err:509 m2 19.3846 Err:509 Err:509

Jumlah Err:509

Btn.Lt2 1 m3 Pekerjaan Beton Balok Latei 13/15 cm Err:509


Uraian Harga Satuan Jumlah
No Kode Satuan Koefisien
( Rp ) ( Rp )
1 2 3 4 5 6 7

Beton Mutu K 175 Err:509 m3 1.0000 Err:509 Err:509


Besi Beton Err:509 Kg 156.8123 Err:509 Err:509
Kayu Begesting Err:509 m2 20.0000 Err:509 Err:509

Jumlah Err:509
Btn.RB2 1 m3 Pekerjaan Beton Reng Balok 15/20 cm Err:509
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah
( Rp ) ( Rp )
1 2 3 4 5 6 7

Beton Mutu K 225 A.4.1.1.7 m3 1.0000 Err:509 Err:509


Besi Beton Err:509 Kg 169.5849 Err:509 Err:509
Kayu Begesting Err:509 m2 15.3846 Err:509 Err:509

Jumlah Err:509

0
0

0
0
DAFTAR HARGA BAHAN DAN UPAH

Pekerjaan : PEMBUATAN LANTAI JEMUR GABAH

Lokasi : Kab. Bengkulu Tengah Propinsi Bengkulu

Tahun Anggaran : 2022

UPAH PEKERJA

1 Pekerja 100,000.00 /hari

2 Tukang Gali 125,000.00 /hari


3 Tukang Batu 125,000.00 /hari

4 KepalaTukang 130,000.00 /hari

5 Mandor 150,000.00 /hari

HARGABAHAN / METERIAL

A BAHAN BATU DAN PASIR

1 Tanah urug 65,000.00 /m3


2 Pasir urug 131,250.00 /m3

3 Pasir pasang 210,000.00 /m3

4 Pasir beton 210,000.00 /m3

5 Batu kali 250,000.00 /m3

6 Sirtu 150,000.00 /m3

7 Koral 220,500.00 /m3


8 Split 1/2 - 2/3 375,000.00 /m3

9 Semen Portland 1,226.00 /kg

10 Semen putih/semen warna 2,600.00 /kg

B HARGA BAHAN KAYU

1 Plywood 6 mm 120,000.00 /lbr

2 Multyplek 9 mm 140,000.00 /lbr


3 Kayu kelas lV ( bekisting ) 2,500,000.00 /m3

4 Kayu kelas III 2,750,000.00 /m3

5 Kayu kelas II 3,250,000.00 /m3

6 Kayu dolcen 20,000.00 /btg

C HARGA BAHAN KACA DAN BESI

1 Paku halus 25,000.00 /kg


2 Paku macam-macam ukuran 20,000.00 /kg
HARGA SATUAN

Kegiatan : Pembangunan Pasca Panen, Pengolahan (Hilirisasi) dan Pemasaran Hasil Perkebunan
Th. Anggaran : 2021

No Uraian Satuan Harga Keterangan

UPAH
1. Pekerja OH 100,000
2. Mandor OH 150,000
3. Tukang OH 125,000
4. Kepala Tukang OH 140,000

BAHAN
1. Bata Merah Buah 600
2. Batu Gunung m3 200,000
3. Koral Bersih m3 220,500
4. Batu Split m3 399,000
5. Pasir Pasang m3 210,000
6. Pasir Urug m3 131,250
7. Tanah Urug m3 80,000
8. Balok Kayu m3 2,835,000
9. Balok Kayu Kelas II m3 2,835,000
10. Dolken Kayu Batang 15,750
11. Kayu Kelas III m3 1,995,000
12. Papan Kayu m3 2,835,000
13. Plywood Tebal 9mm Lembar 126,000
14. Besi Beton ( Polos/Ulir ) Kg 11,260
15. Folding Door besi m2 500,000
16. kaca polos 5 mm m2 99,750
17. Kawat Beton Kg 26,250
18. Paku Kg 13,125
19. Paku 10 cm kg 13,125
20. Paku 5 - 12 cm Kg 13,125
21. Paku seng m 26,250
22. Paku Skrup 1-2,5 cm Kg 13,125
23. Baut Seng Buah 450
24. Semen Kg 1,226
25. Seng gelombang Warna Lbr 70,875
26. Seng Plat m' 28,000
27. Board GRC Lembar 68,000
28. List Plank GRC m' 16,333
29. Lem Kayu Kg 10,500
30. Minyak Bekisting liter 7,000
31. Engsel jendela bh 15,750
32. Engsel pintu bh 31,500
33. Engsel pintu Sliding bh 250,000
34. Grendel Jendela bh 7,875
35. Grendel Pintu bh 36,750
36. Handel Jendela bh 7,350
37. Kait Angin bh 11,375
38. Kunci Tanam 2 Slaag bh 183,750
39. Kran air 1/2" bh 31,500
40. Pipa PVC 3/4" m 8,663
41. Pipa PVC Ø 3" m 27,563
42. Amplas lbr 9,800
43. Cat dasar kayu Kg 42,000
No Uraian Satuan Harga Keterangan
44. Cat dasar tembok kg 15,050
45. Cat meni Kg 52,500
46. Cat penutup kayu Kg 68,250
47. Cat penutup tembok kg 26,250
48. Kuas bh 26,250
49. Plamir Kg 2,739
50. sealant tube 32,550
51. Tiner Kg 27,300
52. Air liter 200
53. Pintu WC Bh 1,365,000
54. Klosed Jongkok Bh 367,500
55. Floor Drain Bh 19,250
56. Ijuk Kg 500
57. Gorong-Gorong Ø 1 m x 0,5 m Bh 225,000
58. Pipa T (Hawa) Bh 26,250
59. Tangki Air (Fiber) Bh 945,000
ANALISA PEKERJAAN INSTALASI LISTRIK

Pekerjaan : PEMBUATAN LANTAI JEMUR GABAH


Lokasi : Kab. Bengkulu Tengah Propinsi Bengkulu
Tahun Anggaran : 2022

Int-p1
Pek. Instalasi Lampu Dan Stop Kontak
Bahan
11.000 m' kabel NYA 2.5 mm2 #NAME? #NAME?
1.000 ttk Instalasi Pipa Lampu dan Stop Kontak #NAME? #NAME?
Jml #NAME?
Tenaga
0.480 oh Pembantu Tukang Listrik 100,000.00 48,000.00
0.048 oh Tukang Listrik #NAME? #NAME?
0.048 oh Kepala Tukang Listrik 130,000.00 6,240.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

Int-StK
Pek. Stop Kontak
Bahan
1.000 bh Stop Kontak #NAME? #NAME?
Jml #NAME?
Tenaga
0.200 oh Pembantu Tukang Listrik 100,000.00 20,000.00
0.020 oh Tukang Listrik #NAME? #NAME?
0.020 oh Kepala Tukang Listrik 130,000.00 2,600.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

Int-STK-AC
Pek.Stop Kontak AC
Bahan
1.000 bh Stop Kontak AC + Fuse #NAME? 65,000.00
Jml 65,000.00
Tenaga
0.200 oh Pembantu Tukang Listrik 100,000.00 20,000.00
0.020 oh Tukang Listrik #NAME? #NAME?
0.020 oh Kepala Tukang Listrik 130,000.00 2,600.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?
Int-LD/8w
Pek. Lampu Downlight LED 8 watt
Bahan
1.000 bh Fiting DownLight #NAME? #NAME?
1.000 bh Lampu LED 8 watt #NAME? #NAME?
Jml #NAME?
Tenaga
0.200 oh Pembantu Tukang Listrik 100,000.00 20,000.00
0.020 oh Tukang Listrik #NAME? #NAME?
0.020 oh Kepala Tukang Listrik 130,000.00 2,600.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

Int-LD/10w
Pek. Lampu Downlight LED 10 watt
Bahan
1.000 bh Fiting DownLight #NAME? #NAME?
1.000 bh Lampu LED 10 watt #NAME? #NAME?
Jml #NAME?
Tenaga
0.200 oh Pembantu Tukang Listrik 100,000.00 20,000.00
0.020 oh Tukang Listrik #NAME? #NAME?
0.020 oh Kepala Tukang Listrik 130,000.00 2,600.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

Int-LD/13w
Pek. Lampu Downlight LED 13 watt
Bahan
1.000 bh Fiting DownLight #NAME? #NAME?
1.000 bh Lampu LED 13 watt #NAME? #NAME?
Jml #NAME?
Tenaga
0.200 oh Pembantu Tukang Listrik 100,000.00 20,000.00
0.020 oh Tukang Listrik #NAME? #NAME?
0.020 oh Kepala Tukang Listrik 130,000.00 2,600.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

Int-LSD/3w
Pek. Lampu Spot Downlight LED 3 watt
Bahan
1.000 bh Fitting Spot Downlight #NAME? #NAME?
1.000 bh Lampu LED 3 watt #NAME? #NAME?
Jml #NAME?
Tenaga
0.200 oh Pembantu Tukang Listrik 100,000.00 20,000.00
0.020 oh Tukang Listrik #NAME? #NAME?
0.020 oh Kepala Tukang Listrik 130,000.00 2,600.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?
Int-LSU/3w
Pek. Lampu Spot Uplight LED 3 watt
Bahan
1.000 bh Fitting Spot Uplight #NAME? #NAME?
1.000 bh Lampu LED 3 watt #NAME? #NAME?
Jml #NAME?
Tenaga
0.200 oh Pembantu Tukang Listrik 100,000.00 20,000.00
0.020 oh Tukang Listrik #NAME? #NAME?
0.020 oh Kepala Tukang Listrik 130,000.00 2,600.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

INT-ST
Pek. Saklar Tunggal
Bahan
1.000 bh Saklar Tunggal #NAME? #NAME?
Jml #NAME?
Tenaga
0.400 oh Pembantu Tukang Listrik 100,000.00 40,000.00
0.040 oh Tukang Listrik #NAME? #NAME?
0.040 oh Kepala Tukang Listrik 130,000.00 5,200.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

INT-SS
Pek. Saklar Serrie
Bahan
1.000 bh Saklar Serrie #NAME? #NAME?
Jml #NAME?
Tenaga
0.400 oh Pembantu Tukang Listrik 100,000.00 40,000.00
0.040 oh Tukang Listrik #NAME? #NAME?
0.040 oh Kepala Tukang Listrik 130,000.00 5,200.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

INT-B/MCB
Pek. Box MCB
Bahan
1.000 bh Box MCB #NAME? #NAME?
3.000 bh MCB #NAME? #NAME?
Jml #NAME?
Tenaga
0.400 oh Pembantu Tukang Listrik 100,000.00 40,000.00
0.040 oh Tukang Listrik #NAME? #NAME?
0.040 oh Kepala Tukang Listrik 130,000.00 5,200.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?
INT-K/NYY3x4
Pek. Instalasi Kabel NYY 3 x 4 mm2 /m'
Bahan
1.100 m' Kabel NYY 3 x 4 mm2 #NAME? #NAME?
1.100 m' Kaabel NYA 2.5 mm2 #NAME? #NAME?
Jml #NAME?
Tenaga
0.070 oh Pembantu Tukang Listrik 100,000.00 7,000.00
0.007 oh Tukang Listrik #NAME? #NAME?
0.007 oh Kepala Tukang Listrik 130,000.00 910.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

INT-K/NYY4x4
Pek. Instalasi Kabel NYY 4 x 4 mm2 /m'
Bahan
1.100 m' Kabel NYY 4 x 4 mm2 #NAME? #NAME?
1.100 m' Kabel NYA 4 mm2 #NAME? #NAME?
Jml #NAME?
Tenaga
0.080 oh Pembantu Tukang Listrik 100,000.00 8,000.00
0.008 oh Tukang Listrik #NAME? #NAME?
0.008 oh Kepala Tukang Listrik 130,000.00 1,040.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

INT-K/NYY4x6
Pek. Instalasi Kabel NYY 4 x 6 mm2 /m'
Bahan
1.100 m' Kabel NYY 4 x 6 mm2 #NAME? #NAME?
1.100 m' Kabel NYA 4 mm2 #NAME? #NAME?
Jml #NAME?
Tenaga
0.090 oh Pembantu Tukang Listrik 100,000.00 9,000.00
0.009 oh Tukang Listrik #NAME? #NAME?
0.009 oh Kepala Tukang Listrik 130,000.00 1,170.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

INT-K/NYY4x10
Pek. Instalasi Kabel NYY 4 x 10 mm2 /m'
Bahan
1.100 m' Kabel NYY 4 x 10 mm2 #NAME? #NAME?
1.100 m' Kabel NYA 6 mm2 #NAME? #NAME?
Jml #NAME?
Tenaga
0.100 oh Pembantu Tukang Listrik 100,000.00 10,000.00
0.010 oh Tukang Listrik #NAME? #NAME?
0.010 oh Kepala Tukang Listrik 130,000.00 1,300.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?
INT-K/NYY4x50
Pek. Instalasi Kabel NYY 4 x 50 mm2 /m'
Bahan
1.100 m' Kabel NYY 4 x 50 mm2 #NAME? #NAME?
1.100 m' Kabel BC 16 mm #NAME? #NAME?
Jml #NAME?
Tenaga
0.200 oh Pembantu Tukang Listrik 100,000.00 20,000.00
0.025 oh Tukang Listrik #NAME? #NAME?
0.025 oh Kepala Tukang Listrik 130,000.00 3,250.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

INT-BC50
Pek. Instalasi Kabel BC 50 mm2
Bahan
1.100 m' Kabel BC 50 mm #NAME? #NAME?
1.100 m' Accesories (Strap Fastener dan Konektor) 35,000.00 38,500.00
Jml #NAME?
Tenaga
0.250 oh Pembantu Tukang Listrik 100,000.00 25,000.00
0.025 oh Tukang Listrik #NAME? #NAME?
0.025 oh Kepala Tukang Listrik 130,000.00 3,250.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

INT-BC35
Pek. Instalasi Kabel BC 35 mm2
Bahan
1.100 m' Kabel BC 35 mm #NAME? #NAME?
1.100 m' Accesories (Strap Fastener dan Konektor) 25,000.00 27,500.00
Jml #NAME?
Tenaga
0.200 oh Pembantu Tukang Listrik 100,000.00 20,000.00
0.025 oh Tukang Listrik #NAME? #NAME?
0.025 oh Kepala Tukang Listrik 130,000.00 3,250.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

INT-BC16
Pek. Instalasi Kabel BC 16 mm2
Bahan
1.100 m' Kabel BC 16 mm #NAME? #NAME?
1.100 m' Accesories (Strap Fastener dan Konektor) 25,000.00 27,500.00
Jml #NAME?
Tenaga
0.200 oh Pembantu Tukang Listrik 100,000.00 20,000.00
0.025 oh Tukang Listrik #NAME? #NAME?
0.025 oh Kepala Tukang Listrik 130,000.00 3,250.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?
PEK-Spz
Pek.Pemasangan Splitzen 3/4 per Unit
Bahan
1.000 bh Splitzen 3/4 #NAME? #NAME?
1.000 bh Connector #NAME? #NAME?
1.000 bh Mounting Base #NAME? #NAME?
Jml #NAME?
Tenaga
0.300 oh Pembantu Tukang Listrik 100,000.00 30,000.00
0.030 oh Tukang Listrik #NAME? #NAME?
0.030 oh Kepala Tukang Listrik 130,000.00 3,900.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

PEK-CR+BK
Pek.Pemasangan Cooper Rod + Bak Kontrol
Bahan
1.000 unit Bak Kontrol uk.dalam 40 x 40 cm (pas. Bata Diplester 225,000.00 225,000.00
1.000 bh Cooper Rod 1/2 Inchi 4 m #NAME? #NAME?
1.000 bh Connector #NAME? #NAME?
1.000 bh Bus Bar #NAME? #NAME?
Jml #NAME?
Tenaga Instal
2.000 oh Pembantu Tukang Listrik 100,000.00 200,000.00
0.200 oh Tukang Listrik #NAME? #NAME?
0.200 oh Kepala Tukang Listrik 130,000.00 26,000.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

INT-K/NYY4x16
Pek. Instalasi Kabel NYY 4 x 16 mm2 /m'
Bahan
1.100 m' Kabel NYY 4 x 16 mm2 #NAME? #NAME?
1.100 m' Kabel NYA 6 mm2 #NAME? #NAME?
Jml #NAME?
Tenaga
0.200 oh Pembantu Tukang Listrik 100,000.00 20,000.00
0.025 oh Tukang Listrik #NAME? #NAME?
0.025 oh Kepala Tukang Listrik 130,000.00 3,250.00
Jml #NAME?
Total biaya Pek. Instalasi lampu dan Stok Kontak #NAME?

-
-

-
-
ANALISA PEKERJAAN INSTALASI LISTRIK

Program = Peningkatan Mutu Pelayanan Kesehatan RS


Kegiatan = Pelayanan Kesehatan Rujukan (DAK)
Pekerjaan = Pengadaan Bangunan Gedung Instalasi Farmasi
Lokasi = RSUD dr. M. Yunus Kota Bengkulu
Sumber Dana = Dana Alokasi Khusus (DAK)
Tahun Anggaran = 2016

HARGA
KODE ANALISA URAIAN PEKERJAAN JUMLAH (Rp)
SATUAN (Rp)
(Rp)

Int-p1 Pek. Instalasi Lampu Dan Stop Kontak


Bahan
11.000 m' kabel NYA 2.5 mm2 - -
1.000 ttk Instalasi Pipa Lampu dan Stop Kontak - -
Jumlah -
Tenaga
0.480 oh Pembantu Tukang Listrik - -
0.048 oh Tukang Listrik - -
0.048 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

Int-StK Pek. Stop Kontak


Bahan
1.000 bh Stop Kontak - -
Jumlah -
Tenaga
0.200 oh Pembantu Tukang Listrik - -
0.020 oh Tukang Listrik - -
0.020 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

Int-STK-AC Pek.Stop Kontak AC


Bahan
1.000 bh Stop Kontak AC + Fuse -
Jumlah -
Tenaga
0.200 oh Pembantu Tukang Listrik - -
0.020 oh Tukang Listrik - -
0.020 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

Int-LD/8w Pek. Lampu Downlight LED 8 watt


Bahan
1.000 bh Fiting DownLight - -
1.000 bh Lampu LED 8 watt - -
Jumlah -
Tenaga
0.200 oh Pembantu Tukang Listrik - -
0.020 oh Tukang Listrik - -
0.020 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -
HARGA
KODE ANALISA URAIAN PEKERJAAN JUMLAH (Rp)
SATUAN (Rp)
(Rp)

Int-LD/10w Pek. Lampu Downlight LED 10 watt


Bahan
1.000 bh Fiting DownLight - -
1.000 bh Lampu LED 10 watt - -
Jumlah -
Tenaga
0.200 oh Pembantu Tukang Listrik - -
0.020 oh Tukang Listrik - -
0.020 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

Int-LD/13w Pek. Lampu Downlight LED 13 watt


Bahan
1.000 bh Fiting DownLight - -
1.000 bh Lampu LED 13 watt - -
Jumlah -
Tenaga
0.200 oh Pembantu Tukang Listrik - -
0.020 oh Tukang Listrik - -
0.020 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

Int-LSD/3w Pek. Lampu Spot Downlight LED 3 watt


Bahan
1.000 bh Fitting Spot Downlight - -
1.000 bh Lampu LED 3 watt - -
Jumlah -
Tenaga
0.200 oh Pembantu Tukang Listrik - -
0.020 oh Tukang Listrik - -
0.020 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

Int-LSU/3w Pek. Lampu Spot Uplight LED 3 watt


Bahan
1.000 bh Fitting Spot Uplight - -
1.000 bh Lampu LED 3 watt - -
Jumlah -
Tenaga
0.200 oh Pembantu Tukang Listrik - -
0.020 oh Tukang Listrik - -
0.020 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

INT-ST Pek. Saklar Tunggal


Bahan
1.000 bh Saklar Tunggal - -
Jumlah -
Tenaga
0.400 oh Pembantu Tukang Listrik - -
0.040 oh Tukang Listrik - -
0.040 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -
HARGA
KODE ANALISA URAIAN PEKERJAAN JUMLAH (Rp)
SATUAN (Rp)
(Rp)

INT-SS Pek. Saklar Serrie


Bahan
1.000 bh Saklar Serrie - -
Jumlah -
Tenaga
0.400 oh Pembantu Tukang Listrik - -
0.040 oh Tukang Listrik - -
0.040 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

INT-B/MCB Pek. Box MCB


Bahan
1.000 bh Box MCB - -
3.000 bh MCB - -
Jumlah -
Tenaga
0.400 oh Pembantu Tukang Listrik - -
0.040 oh Tukang Listrik - -
0.040 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

INT-K/NYY3x4 Pek. Instalasi Kabel NYY 3 x 4 mm2 /m'


Bahan
1.100 m' Kabel NYY 3 x 4 mm2 - -
1.100 m' Kaabel NYA 2.5 mm2 - -
Jumlah -
Tenaga
0.070 oh Pembantu Tukang Listrik - -
0.007 oh Tukang Listrik - -
0.007 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

INT-K/NYY4x4 Pek. Instalasi Kabel NYY 4 x 4 mm2 /m'


Bahan
1.100 m' Kabel NYY 4 x 4 mm2 - -
1.100 m' Kabel NYA 4 mm2 - -
Jumlah -
Tenaga
0.080 oh Pembantu Tukang Listrik - -
0.008 oh Tukang Listrik - -
0.008 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

INT-K/NYY4x6 Pek. Instalasi Kabel NYY 4 x 6 mm2 /m'


Bahan
1.100 m' Kabel NYY 4 x 6 mm2 - -
1.100 m' Kabel NYA 4 mm2 - -
Jumlah -
Tenaga
0.090 oh Pembantu Tukang Listrik - -
0.009 oh Tukang Listrik - -
0.009 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -
HARGA
KODE ANALISA URAIAN PEKERJAAN JUMLAH (Rp)
SATUAN (Rp)
(Rp)

INT-K/NYY4x10 Pek. Instalasi Kabel NYY 4 x 10 mm2 /m'


Bahan
1.100 m' Kabel NYY 4 x 10 mm2 - -
1.100 m' Kabel NYA 6 mm2 - -
Jumlah -
Tenaga
0.100 oh Pembantu Tukang Listrik - -
0.010 oh Tukang Listrik - -
0.010 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

INT-K/NYY4x50 Pek. Instalasi Kabel NYY 4 x 50 mm2 /m'


Bahan
1.100 m' Kabel NYY 4 x 50 mm2 - -
1.100 m' Kabel BC 16 mm - -
Jumlah -
Tenaga
0.200 oh Pembantu Tukang Listrik - -
0.025 oh Tukang Listrik - -
0.025 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

INT-BC50 Pek. Instalasi Kabel BC 50 mm2


Bahan
1.100 m' Kabel BC 50 mm - -
1.100 m' Accesories (Strap Fastener dan Konektor) - -
Jumlah -
Tenaga
0.250 oh Pembantu Tukang Listrik - -
0.025 oh Tukang Listrik - -
0.025 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

INT-BC35 Pek. Instalasi Kabel BC 35 mm2


Bahan
1.100 m' Kabel BC 35 mm - -
1.100 m' Accesories (Strap Fastener dan Konektor) - -
Jumlah -
Tenaga
0.200 oh Pembantu Tukang Listrik - -
0.025 oh Tukang Listrik - -
0.025 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

INT-BC16 Pek. Instalasi Kabel BC 16 mm2


Bahan
1.100 m' Kabel BC 16 mm - -
1.100 m' Accesories (Strap Fastener dan Konektor) - -
Jumlah -
Tenaga
0.200 oh Pembantu Tukang Listrik - -
0.025 oh Tukang Listrik - -
0.025 oh Kepala Tukang Listrik - -
Jumlah -
HARGA
KODE ANALISA URAIAN PEKERJAAN JUMLAH (Rp)
SATUAN (Rp)
(Rp)
Total biaya Pek. Instalasi lampu dan Stok Kontak -
HARGA
KODE ANALISA URAIAN PEKERJAAN JUMLAH (Rp)
SATUAN (Rp)
(Rp)

PEK-Spz Pek.Pemasangan Splitzen 3/4 per Unit


Bahan
1.000 bh Splitzen 3/4 - -
1.000 bh Connector - -
1.000 bh Mounting Base - -
Jumlah -
Tenaga
0.300 oh Pembantu Tukang Listrik - -
0.030 oh Tukang Listrik - -
0.030 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

PEK-CR+BK Pek.Pemasangan Cooper Rod + Bak Kontrol


Bahan
1.000 unit Bak Kontrol uk.dlm 40x40 cm (pas. Bata Diplester) - -
1.000 bh Cooper Rod 1/2 Inchi 4 m - -
1.000 bh Connector - -
1.000 bh Bus Bar - -
Jumlah -
Tenaga Instal
2.000 oh Pembantu Tukang Listrik - -
0.200 oh Tukang Listrik - -
0.200 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

INT-K/NYY4x16 Pek. Instalasi Kabel NYY 4 x 16 mm2 /m'


Bahan
1.100 m' Kabel NYY 4 x 16 mm2 - -
1.100 m' Kabel NYA 6 mm2 - -
Jumlah -
Tenaga
0.200 oh Pembantu Tukang Listrik - -
0.025 oh Tukang Listrik - -
0.025 oh Kepala Tukang Listrik - -
Jumlah -
Total biaya Pek. Instalasi lampu dan Stok Kontak -

#NAME?

- #NAME?
- #NAME?
-
-

#NAME?
#NAME?
HARGA SATUAN BAHAN
Program : Program Peningkatan Mutu Pelayanan kesehatan RS
Kegiatan : Pelayanan Kesehatan Rujukan (DAK)
Pekerjaan : Pengadaan Bangunan Gedung Instalasi Farmasi
Lokasi : Kota Bengkulu
Sumber Dana : Dana Alokasi Khusus (DAK)
Tahun Anggaran : 2016

NO URAIAN UPAH KERJA PER


I UPAH KERJA
1 Pembantu Tukang Listrik 75,000.00 oh
2 Tukang Listrik 88,000.00 oh
3 Kepala Tukang Listrik 110,000.00 oh

II BAHAN HARGA
Intalasi Pipa + Accessories 32,500.00 /ttk
A KABEL
Kabel NYA 2.5 mm2 3,277.50 m'
Kabel NYY 3 x 2.5 mm2 14,191.00 m'
Kabel NYY 3 x 4 mm2 22,413.50 m'
Kabel NYY 4 x 4 mm3 27,151.50 m'
Kabel NYY 4 x 6 mm2 35,190.00 m'
Kabel NYY 4 x 10 mm2 59,478.00 m'
Kabel NYY 4 x 16 mm3 75,000.00 m'
Kabel NYY 4 x 50 mm2 225,055.00 m'
Kabel NYA 4 mm2 4,255.00 m'
Kabel NYA 6 mm2 6,210.00 m'
Kabel BC 16 mm2 18,312.50 m'
Kabel BC 35 mm3 33,750.00 m'
Kabel BC 50 mm4 64,500.00 m'
B LAMPU DAN STOP KONTAK
Fitting Downlight (Setara Clipsal) 75,000.00 bh
Fitting Spot Dowliht (Setara Clipsal) 40,000.00 bh
Fitting Spot Uplight (Setara Clipsal) 75,000.00 bh
Saklar Serrie (Setara Clipsal) 25,000.00 bh
Saklar Tunggal (Setara Clipsal) 20,000.00 bh
Stop Kontak (Setara Clipsal) 25,000.00 bh
Stop Kontak AC (Setara Clipsal) 65,000.00 bh
Lampu Led 8 watt (Setara Philips) 65,000.00 bh
Lampu Led 10 watt (Setara Philips) 85,000.00 bh
Lampu Led 13 watt (Setara Philips) 105,000.00 bh
Lampu Spot Downlight Led 3 watt (Setara Philips) 30,000.00 bh
Lampu pot Uplight Led 3 watt (Setara Philips) 30,000.00 bh
C PENGAMAN / PANEL
Box MCB 80,000.00 bh
MCB 50,000.00 bh
PANEL MDP 6,450,000.00 UNIT
Splitzen 3/4 220,000.00 bh
Mounting Base 50,000.00 bh
Connector BC 81,500.00 bh
Cooper Rod 1/2 " 4 m 600,000.00 btg
Bus Bar 125,000.00 /bh
PROGRAM : PENINGKATAN PELAYANAN KESEHATAN RS
KEGIATAN : PELAYANAN KESEHATAN RUJUKAN
PEKERJAAN : PERENCANAAN GEDUNG DAN BANGUNAN
PENGADAAN BANGUNAN KESEHATAN
LOKASI : KOTA BENGKULU
TAHUN ANGGARAN : 2015
NO KONTRAK :
KONTRAKTOR PELAKSANA :
KONSULTAN PENGAWAS :

A PEKERJAAN TANAH DAN PASIR

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

1 Pek. Pas. Bouwplank M' 79.00 M' Pek. Pas. Bouwplank


Panjang
GAMBAR Volume = 21.00 + 2.00 = 23.00 m'
= 21.00 + 2.00 = 23.00 m'
= 14.50 + 2.00 = 16.50 m'
= 14.50 + 2.00 = 16.50 m'
79.00 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

1 Galian Tanah Pondasi M3 163.10 M3 Galian Tanah Pondasi


Panjang Lebar Tinggi Jumlah
GAMBAR Pond. Plat Type 1 = 1.50 x 1.50 x 2.00 x 32.00 = 144.00 m3

Pond. Batu Kali


Panjang = 5.90 + 1.50 + 1.50 + 1.50 + 3.67
1.00 + 1.00 + + +
= 16.07 m'
Lebar = 0.80 m'
Tinggi = 0.90 m'

Volume = Panjang x Lebar x Tinggi


= 16.07 x 0.80 x 0.90
= 11.57 m3
Sloof 20/35 Volume = Panjang x Lebar x Tinggi
= 107.50 x 0.20 x 0.35
= 7.53 m3
Total Volum = 144.00 + 11.57 + 7.53 = 163.10 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Urugan Tanah Kembali M3 6.88 M3 Urugan Tanah Kembali

GAMBAR Pek. Galian = 163.10 m3


Pek. Pengurangan
Urugan Pasir = 8.49
Lantai Kerja = 5.04
Pas. Batu Kosong = 116.15
Pas. Batu Kali = 4.34
Pondasi Plat = 22.20
= 156.21 m3

Volume Urugan Kembali = 163.10 - 156.21


= 6.88 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

2 Pek. Urugan Pasir Bawah Pondasi M3 8.49 M3 Pek. Urugan Pasir Bawah Pondasi
Panjang Lebar Tebal Jumlah
GAMBAR Pond. Plat Type 1 = 1.50 x 1.50 x 0.10 x 32.00 = 7.20 m3

Pond. Batu Kali


Panjang = 5.90 + 1.50 + 1.50 + 1.50 + 3.67
1.00 + 1.00 + + +
= 16.07 m'
Lebar = 0.80 m'
Tebal = 0.10 m'

Volume = Panjang x Lebar x Tinggi


= 16.07 x 0.80 x 0.10
= 1.29 m3
Total Volum = 7.20 + 1.29 = 8.49 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pekerjaan Urugan Pasir Bawah Lantai T. 10 Cm M3 30.40 M3 Pekerjaan Urugan Pasir Bawah Lantai T. 10 Cm
Luas Jumlah Tebal
GAMBAR Volume = 10.85 x 9.00 x 0.10 = 9.77 m3
= 9.20 x 6.00 x 0.10 = 5.52 m3
= 14.15 x 2.00 x 0.10 = 2.83 m3
= 12.22 x 2.00 x 0.10 = 2.44 m3
= 1.51 x 2.00 x 0.10 = 0.30 m3
= 2.87 x 2.00 x 0.10 = 0.57 m3
= 7.65 x 1.00 x 0.10 = 0.77 m3
= 10.59 x 1.00 x 0.10 = 1.06 m3
= 2.78 x 1.00 x 0.10 = 0.28 m3
= 68.58 x 1.00 x 0.10 = 6.86 m3
30.40 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pekerjaan Rabat Beton Bawah Lantai T. 7 Cm M3 19.59 M3 Pekerjaan Rabat Beton Bawah Lantai T. 7 Cm
Luas Jumlah Tebal
GAMBAR Volume = 10.85 x 9.00 x 0.07 = 6.84 m3
= 9.20 x 6.00 x 0.07 = 3.86 m3
= 14.15 x 2.00 x 0.07 = 1.98 m3
= 12.22 x 2.00 x 0.07 = m3
= 1.51 x 2.00 x 0.07 = 0.21 m3
= 2.87 x 2.00 x 0.07 = 0.40 m3
= 7.65 x 1.00 x 0.07 = 0.54 m3
= 10.59 x 1.00 x 0.07 = 0.74 m3
= 2.78 x 1.00 x 0.07 = 0.19 m3
= 68.94 x 1.00 x 0.07 = 4.83 m3
19.59 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pek. Pas. Lantai Keramik 40x40 lt1 M2 343.78 M2 Pek. Pas. Lantai Keramik 40x40 lt1
Luas Jumlah
GAMBAR Luasa Area 1 = 138.81 x 1.00 = 138.81 m2
Luasa Area 2 = 108.28 x 1.00 = 108.28 m2
Luasa Area 3 = 37.29 x 1.00 = 37.29 m2
Luasa Area 4 = 15.37 x 1.00 = 15.37 m2
Luasa Area 5 = 40.01 x 1.00 = 40.01 m2
Luasa Area 6 = 4.02 x 1.00 = 4.02 m2
= x = - m2
= x = - m2
= x = - m2
343.78 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pek. Pas. Lantai Keramik 40x40 lt2 M2 179.85 M2 Pek. Pas. Lantai Keramik 40x40 lt2
Luas Jumlah
GAMBAR Luasa Area 1 = 99.92 x 1.00 = 99.92 m2
Luasa Area 2 = 30.84 x 1.00 = 30.84 m2
Luasa Area 3 = 34.16 x 1.00 = 34.16 m2
Luasa Area 4 = 14.93 x 1.00 = 14.93 m2
Luasa Area 5 = x 1.00 = - m2
Luasa Area 6 = x 1.00 = - m2
= x = - m2
= x = - m2
= x = - m2
179.85 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pek. Lantai Floor Hardener + Curing Compound M2 25.88 M2 Pek. Lantai Floor Hardener + Curing Compound
Luas Jumlah
GAMBAR Ruang Steril = 12.94 x 2.00 = 25.88 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pek. Lantai Beton Bertulang (Ruang Steril) M3 2.59 M3 Pek. Lantai Beton Bertulang (Ruang Steril)
Luas Jumlah Tebal
GAMBAR Ruang Steril = 12.94 x 2.00 x 0.10 = 2.59 m2

8.00 = 64.00 x 0.01 x 6.67 x 1.00 = 2.63 kg


8.00 = 64.00 x 0.01 x 6.67 x 1.00 = 2.63 kg
5.26 kg
1 m' = 0.10 m2
1 m3 = 10.00 m'

Besi = 52.61 kg

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pas. Keramik Dinding 40x40 M2 21.04 M2 Pas. Keramik Dinding 40x40
Panjang Tinggi
GAMBAR Volume = 7.50 x 3.40 = 25.50 m2
Pek. Pengurangan = 1.90 x 2.35 = 4.47 m2
21.04 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pek. Pas. Keramik 20x20 M2 9.17 M2 Pek. Pas. Keramik 20x20
Luas Jumlah
GAMBAR Wc1 = 4.79 x 1.00 = 4.79 m2
Wc2 = 4.38 x 1.00 = 4.38 m2
9.17 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pek. Pas. Keramik Dinding 40x40 M2 22.48 M2 Pek. Pas. Keramik Dinding 40x40
Panjang Tinggi
GAMBAR Wc1 = 9.61 x 1.20 = 11.53 m2
Wc2 = 9.12 x 1.20 = 10.94 m2
Pantry = x 1.20 = - m2
T. cuci = x 1.20 = - m2
22.48 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pek. Pas. Keramik Dinding 20x25 M2 9.37 M2 Pek. Pas. Keramik Dinding 20x25
Panjang Tinggi
GAMBAR Wc1 = 9.61 x 0.50 = 4.81 m2
Wc2 = 9.12 x 0.50 = 4.56 m2
Pantry = x 0.50 = - m2
T. cuci = x 0.50 = - m2
9.37 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pek. Keramik Tangga M2 11.80 M2 Pek. Keramik Tangga


Panjang Lebar
GAMBAR Pijakan = 4.20 x 1.00 = 4.20 m2
Dinding = 4.00 x 1.00 = 4.00 m2
Bordes = 3.60 x 1.00 = 3.60 m2
11.80 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Pas. Keramik 20x20 lt2 M2 5.56 M2 Pek. Pas. Keramik 20x20 lt2
Luas Jumlah
GAMBAR Wc1 = 3.03 x 1.00 = 3.03 m2
Wc2 = 2.53 x 1.00 = 2.53 m2
5.56 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Pas. Keramik Dinding 40x40 lt2 M2 14.27 M2 Pek. Pas. Keramik Dinding 40x40 lt2
Panjang Tinggi
GAMBAR Wc1 = 6.21 x 1.20 = 7.45 m2
Wc2 = 5.68 x 1.20 = 6.82 m2
Pantry = x 1.20 = - m2
T. cuci = x 1.20 = - m2
14.27 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pek. Pas. Keramik Dinding 20x25 lt2 M2 5.95 M2 Pek. Pas. Keramik Dinding 20x25 lt2
Panjang Tinggi
GAMBAR Wc1 = 6.21 x 0.50 = 3.11 m2
Wc2 = 5.68 x 0.50 = 2.84 m2
Pantry = x 0.50 = - m2
T. cuci = x 0.50 = - m2
5.95 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Cor Beton Lantai Kerja T. 7 Cm M3 5.04 M3 Cor Beton Lantai Kerja T. 7 Cm
Panjang Lebar Tebal Jumlah
GAMBAR Pond. Plat Type 1 = 1.50 x 1.50 x 0.07 x 32.00 = 5.04 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pek. Pondasi Plat Setempat 140x140 M3 22.20 M3 Pek. Pondasi Plat Setempat 140x140

GAMBAR Panjang Lebar Tebal/Tinggi Jumlah


Pond. Plat Tapak = 1.40 x 1.40 x 0.23 x 32.00 = 14.11 m3
Leheran = 0.40 x 0.40 x 1.58 x 32.00 = 8.09 m3
22.20 m3

Luas Penampang = 40.00 x 40.00 = 1,600.00 cm2


Toleransi Min 1% = 28.00 Min Luas Penampang Besi Pokok 1.75%
Jari Jari Indeks
16.00 = 0.80 x 0.80 x 3.14 = 2.01 cm2 (Luas Penampang Besi)
Jumlah Besi Digunakan = Toleransi <= Luas Penampang Besi
Toleransi Jumlah
16.00 = 2.01 x 28.13 = 14 btg
28.00 <= 28.13

16.00 = 256.00 x 0.01 x 20.00 x 1.90 = 59.97 kg


16.00 = 256.00 x 0.01 x 20.00 x 1.55 = 48.93 kg
16.00 = 256.00 x 0.01 x 12.00 x 2.11 = 39.96 kg
8.00 = 64.00 x 0.01 x 16.00 x 1.50 = 9.47 kg
158.33 kg
1 Lbg = 0.69 m3
1 m3 = 1.44 lbg
Besi = 228.21 kg
Bekisting = 5.37 m2
BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pekerjaan Balok Sloof 20/35 M3 11.53 M3 Pekerjaan Balok Sloof 20/35
Panjang = Horizontal Vertikal Jumlah
GAMBAR = x 3.10 x 27.00 = 83.70 m'
= 4.10 x x 7.00 = 28.70 m'
= 2.60 x x 7.00 = 18.20 m'
= 3.10 x x 11.00 = 34.10 m'
164.70 m'

Panjang Lebar Tebal/Tinggi


Leheran = 164.70 x 0.20 x 0.35 = 11.53 m3

Indeks Mutu Beton


Rasio Penulangan ( r ) = 1.40 x 300.00 = 0.005

Jari Jari Indeks


Diameter Besi 16.00 = 8.00 x 8.00 x 3.14 = 200.96 mm2 (Luas Penampang Besi)

Lapangan = Rasio ( r ) x 4.00 x L. Balok x T. Balok - Selimut (5 cm)


= 0.005 4.00 200.00 300.00
= 1,120.00 / (Luas Penampang Besi)
= 1,120.00 / 200.96
= 6 btg

16.00 = 256.00 x 0.01 x 6.00 x 1.00 = 9.47 kg


12.00 = 144.00 x 0.01 x 3.00 x 1.00 = 2.66 kg
8.00 = 64.00 x 0.01 x 6.67 x 0.88 = 2.31 kg
14.45 kg
1 m' = 0.07 m2
1 m3 = 14.29 m'
Besi = 206.39 kg
Bekisting = 10.00 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pekerjaan Balok Sloof 15/20 M3 0.48 M3 Pekerjaan Balok Sloof 15/20
Panjang = 3.31 + 0.93 + 0.93 = 5.17 m'
GAMBAR 5.26 + 1.83 + 1.83 = 8.92 m'
1.83 + + = 1.83 m'
15.92 m'

Panjang Lebar Tebal/Tinggi


Leheran = 15.92 x 0.15 x 0.20 = 0.48 m3

Indeks Mutu Beton


Rasio Penulangan ( r ) = 1.40 x 300.00 = 0.005

Jari Jari Indeks


Diameter Besi 10.00 = 5.00 x 5.00 x 3.14 = 78.50 mm2 (Luas Penampang Besi)

Lapangan = Rasio ( r ) x 4.00 x L. Balok x T. Balok - Selimut (5 cm)


= 0.005 4.00 150.00 150.00
= 420.00 / (Luas Penampang Besi)
= 420.00 / 78.50
= 5 btg

10.00 = 100.00 x 0.01 x 4.00 x 1.00 = 2.47 kg


6.00 = 36.00 x 0.01 x 6.67 x 0.58 = 0.86 kg
3.32 kg
1 m' = 0.03 m2
1 m3 = 33.33 m'
Besi = 110.81 kg
Bekisting = 13.33 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan kolom 40x40 M3 16.64 M3 Pekerjaan kolom 40x40

GAMBAR Panjang Lebar Tebal/Tinggi Jumlah


Volume Pekerjaan = 0.40 x 0.40 x 4.00 x 26.00 = 16.64 m3

Luas Penampang = 40.00 x 40.00 = 1,600.00 cm2


Toleransi Min 1% = 24.00 Min Luas Penampang Besi Pokok 1.50%
Jari Jari Indeks
0.12 16.00 = 0.80 x 0.80 x 3.14 = 2.01 cm2 (Luas Penampang Besi)
Jumlah Besi Digunakan = Toleransi <= Luas Penampang Besi
Toleransi Jumlah
16.00 = 2.01 x 24.12 = 12 btg
24.00 <= 24.12

16.00 = 256.00 x 0.01 x 12.00 x 1.00 = 18.94 kg


8.00 = 64.00 x 0.01 x 6.67 x 1.50 = 3.95 kg
22.88 kg
1 m' = 0.16 m2
1 m3 = 6.25 m'
Besi = 143.03 kg
Bekisting = 10.00 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 0.65 M3 #NAME?

GAMBAR Panjang Lebar Tebal/Tinggi Jumlah


Volume Pekerjaan = 0.30 x 0.30 x 3.60 x 2.00 = 0.65 m3

Luas Penampang = 30.00 x 30.00 = 900.00 cm2


Toleransi Min 1% = 9.00 Min Luas Penampang Besi Pokok 1.00%
Jari Jari Indeks
16.00 = 0.80 x 0.80 x 3.14 = 2.01 cm2 (Luas Penampang Besi)
Jumlah Besi Digunakan = Toleransi <= Luas Penampang Besi
Toleransi Jumlah
16.00 = 2.01 x 8.04 = 4 btg
9.00 <= 8.04

16.00 = 256.00 x 0.01 x 4.00 x 1.00 = 6.31 kg


12.00 = 144.00 x 0.01 x 4.00 x 1.00 = 3.55 kg
8.00 = 64.00 x 0.01 x 8.00 x 1.08 = 3.41 kg
13.27 kg
1 m' = 0.09 m2
1 m3 = 11.11 m'
Besi = 147.48 kg
Bekisting = 13.33 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 0.42 M3 #NAME?

GAMBAR Panjang Lebar Tebal/Tinggi Jumlah


Volume Pekerjaan = 0.25 x 0.25 x 6.70 x 1.00 = 0.42 m3

Luas Penampang = 25.00 x 25.00 = 625.00 cm2


Toleransi Min 1% = 6.25 Min Luas Penampang Besi Pokok 1.00%
Jari Jari Indeks
16.00 = 0.80 x 0.80 x 3.14 = 2.01 cm2 (Luas Penampang Besi)
Jumlah Besi Digunakan = Toleransi <= Luas Penampang Besi
Toleransi Jumlah
16.00 = 2.01 x 8.04 = 4 btg
6.25 <= 8.04

12.00 = 144.00 x 0.01 x 4.00 x 1.00 = 3.55 kg


12.00 = 144.00 x 0.01 x 4.00 x 1.00 = 3.55 kg
8.00 = 64.00 x 0.01 x 8.00 x 1.08 = 3.41 kg
10.51 kg
1 m' = 0.06 m2
1 m3 = 16.00 m'
Besi = 168.18 kg
Bekisting = 16.00 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Kolom Praktis (Lt. 1) M3 0.22 M3 Pekerjaan Kolom Praktis (Lt. 1)

GAMBAR Panjang Lebar Tebal/Tinggi Jumlah


Volume Pekerjaan = 0.12 x 0.12 x 3.10 x 5.00 = 0.22 m3
= 0.12 x 0.12 x x = - m3
= 0.12 x 0.12 x x = - m3
= 0.12 x 0.12 x x = - m3
0.22 m3
Luas Penampang = 12.00 x 12.00 = 144.00 cm2
Toleransi Min 1% = 2.52 Min Luas Penampang Besi Pokok 1.75%
Jari Jari Indeks
10.00 = 0.50 x 0.50 x 3.14 = 0.79 cm2 (Luas Penampang Besi)
Jumlah Besi Digunakan = Toleransi <= Luas Penampang Besi
Toleransi Jumlah
10.00 = 0.79 x 3.14 = 4 btg
2.52 <= 3.14

10.00 = 100.00 x 0.01 x 4.00 x 1.00 = 2.47 kg


6.00 = 36.00 x 0.01 x 6.67 x 0.38 = 0.56 kg
3.03 kg
1 m' = 0.01 m2
1 m3 = 69.44 m'
Besi = 210.30 kg
Bekisting = 16.67 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Balok Pintu 20/20 M3 0.23 M3 Pekerjaan Balok Pintu 20/20


Panjang = 1.60 + 1.60 + 2.60 = 5.80 m'
GAMBAR

Panjang Lebar Tebal/Tinggi


Leheran = 5.80 x 0.20 x 0.20 = 0.23 m3

Indeks Mutu Beton


Rasio Penulangan ( r ) = 1.40 x 300.00 = 0.005

Jari Jari Indeks


Diameter Besi 10.00 = 5.00 x 5.00 x 3.14 = 78.50 mm2 (Luas Penampang Besi)

Lapangan = Rasio ( r ) x 4.00 x L. Balok x T. Balok - Selimut (5 cm)


= 0.005 4.00 200.00 150.00
= 560.00 / (Luas Penampang Besi)
= 560.00 / 78.50
= 7 btg

10.00 = 100.00 x 0.01 x 6.00 x 1.00 = 3.70 kg


6.00 = 36.00 x 0.01 x 6.67 x 0.68 = 1.01 kg
4.71 kg
1 m' = 0.04 m2
1 m3 = 25.00 m'
Besi = 117.63 kg
Bekisting = 15.00 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan balok Latei 10/15 (Diatas Pintu) M3 0.55 M3 Pekerjaan balok Latei 10/15 (Diatas Pintu)
Panjang = 0.80 + 2.14 + 3.10 = 6.04 m'
GAMBAR 3.10 + 3.10 + 3.10 = 9.30 m'
3.10 + 3.10 + 2.24 = 8.44 m'
2.24 + 1.62 + 1.87 = 5.73 m'
1.87 + 1.87 + 0.80 = 4.54 m'
2.60 + + = 2.60 m'
36.65 m'

Panjang Lebar Tebal/Tinggi


Leheran = 36.65 x 0.10 x 0.15 = 0.55 m3

8.00 = 64.00 x 0.01 x 4.00 x 1.00 = 1.58 kg


6.00 = 36.00 x 0.01 x 5.00 x 0.44 = 0.49 kg
2.07 kg
1 m' = 0.02 m2
1 m3 = 66.67 m'
Besi = 137.77 kg
Bekisting = 20.00 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan balok Latei 10/15 (Diatas Ventilasi) M3 1.11 M3 Pekerjaan balok Latei 10/15 (Diatas Ventilasi)
Panjang = 1.10 + 1.87 + 0.87 = 3.84 m'
GAMBAR 1.24 + 1.87 + 2.98 = 6.09 m'
2.98 + 2.98 + 3.10 = 9.06 m'
1.87 + 1.87 + 1.87 = 5.61 m'
1.62 + 2.24 + 2.24 = 6.10 m'
3.10 + 3.10 + 3.10 = 9.30 m'
3.10 + 3.10 + 3.10 = 9.30 m'
3.10 + 3.10 + 3.10 = 9.30 m'
3.10 + 3.10 + 3.10 = 9.30 m'
3.10 + 3.10 + = 6.20 m'
74.10 m'

Panjang Lebar Tebal/Tinggi


Leheran = 74.10 x 0.10 x 0.15 = 1.11 m3

Indeks Mutu Beton


Rasio Penulangan ( r ) = 1.40 x 300.00 = 0.005

Jari Jari Indeks


Diameter Besi 8.00 = 4.00 x 4.00 x 3.14 = 50.24 mm2 (Luas Penampang Besi)

Lapangan = Rasio ( r ) x 4.00 x L. Balok x T. Balok - Selimut (5 cm)


= 0.005 4.00 120.00 100.00
= 224.00 / (Luas Penampang Besi)
= 224.00 / 50.24
= 4 btg

8.00 = 64.00 x 0.01 x 4.00 x 1.00 = 1.58 kg


6.00 = 36.00 x 0.01 x 5.00 x 0.44 = 0.49 kg
2.07 kg
1 m' = 0.02 m2
1 m3 = 66.67 m'
Besi = 137.77 kg
Bekisting = 20.00 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 3.39 M3 #NAME?

GAMBAR Panjang Pekerjaan = 5.80 + 4.80 x 8.00


= 10.60 x 8.00 = 84.80 m'
Panjang Lebar Tebal
Volume Pekerjaan = 84.80 x 0.40 x 0.10 = 3.39 m3

12.00 = 144.00 x 0.01 x 10.00 x 1.14 = 10.12 kg


8.00 = 64.00 x 0.01 x 8.00 x 1.00 = 3.16 kg
13.28 kg
1 m' = 0.04 m2
1 m3 = 25.00 m'
Besi = 331.92 kg
Bekisting = 12.50 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Meja Beton T. 8 Cm M3 0.13 M3 Pekerjaan Meja Beton T. 8 Cm

GAMBAR Panjang Lebar Tebal/Tinggi Jumlah


Volume Pekerjaan = 1.62 x 0.50 x 0.08 x 1.00 = 0.06 m3
= 1.24 x 0.50 x 0.08 x 1.00 = 0.05 m3
Pek. Pengurangan = 0.40 x 0.40 x 0.08 x 1.00 = 0.01 m3
0.13 m3
8.00 = 64.00 x 0.01 x 6.00 x 1.00 = 2.37 kg
8.00 = 64.00 x 0.01 x 10.00 x 0.55 = 2.17 kg
4.54 kg
1 m' = 0.04 m2
1 m3 = 25.00 m'
Besi = 113.44 kg
Bekisting = 12.50 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 0.47 M3 #NAME?


- Kolom Tangga 20x20 M3 0.14 M3 Panjang Lebar Tebal/Tinggi Jumlah
- #NAME? M3 0.34 M3 Pond. Plat Tapak = 1.50 x 0.80 x 0.20 x 1.00 = 0.24 m3
- #NAME? M3 1.40 M3 Leheran = 1.50 x 0.20 x 0.75 x 1.00 = 0.23 m3
- #NAME? M3 0.79 M3 0.47 m3

GAMBAR 10.00 = 100.00 x 0.01 x 10.00 x 0.85 = 5.24 kg


10.00 = 100.00 x 0.01 x 5.00 x 1.85 = 5.70 kg
10.00 = 100.00 x 0.01 x 10.00 x 0.55 = 3.39 kg
10.00 = 100.00 x 0.01 x 5.00 x 1.55 = 4.78 kg
10.00 = 100.00 x 0.01 x 20.00 x 1.18 = 14.49 kg
8.00 = 64.00 x 0.01 x 6.00 x 3.30 = 7.81 kg
41.41 kg
1 Lbg = 0.47 m3
1 m3 = 2.15 lbg
Besi = 89.06 kg
Bekisting = 7.46 m2

Kolom Tangga 20x20


Panjang Lebar Tebal/Tinggi Jumlah
Volume Pekerjaan = 0.20 x 0.20 x 1.75 x 2.00 = 0.14 m3

#NAME?
Panjang Lebar Tebal/Tinggi
Leheran = 5.70 x 0.20 x 0.30 = 0.34 m3

#NAME?
Panjang Lebar Tebal/Tinggi
Leheran = 7.75 x 1.50 x 0.12 = 1.40 m3

12.00 = 144.00 x 0.01 x 10.00 x 1.00 = 8.88 kg


12.00 = 144.00 x 0.01 x 10.00 x 1.00 = 8.88 kg
10.00 = 100.00 x 0.01 x 6.67 x 1.00 = 4.11 kg
10.00 = 100.00 x 0.01 x 6.67 x 1.00 = 4.11 kg
25.98 kg
1 m' = 0.12 m2
1 m3 = 8.33 m'
Besi = 216.46 kg
Bekisting = 8.33 m2

#NAME?
Vol. Anak Tangga & Plat = 0.30 x 0.25 / 2.00 = 0.04 m2
= 0.04 x 1.50 = 0.06 m3
= 0.06 x 14.00 = 0.79 m3

8.00 = 64.00 x 0.01 x 3.00 x 1.50 = 1.78 kg


10.00 = 100.00 x 0.01 x 10.00 x 0.82 = 5.06 kg
6.83 kg
1 m' = 0.04 m2
1 m3 = 26.67 m'
Besi = 182.16 kg
Bekisting = 6.67 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Pondasi Plat P2 (80x110), Tangga M3 0.25 M3 Pek. Pondasi Plat P2 (80x110), Tangga
- Kolom Tangga 20x20 M3 0.14 M3 Panjang Lebar Tebal/Tinggi Jumlah
- Pek. Balok Tangga 20/30 M3 0.19 M3 Pond. Plat Tapak = 1.10 x 0.80 x 0.20 x 1.00 = 0.18 m3
- Pek. Plat Beton Tangga T. 12 Cm M3 1.40 M3 Leheran = 1.10 x 0.20 x 0.33 x 1.00 = 0.07 m3
- Pek. Tangga Beton 25/40, Plat T. 12 Cm M3 0.88 M3 0.25 m3

GAMBAR 10.00 = 100.00 x 0.01 x 10.00 x 0.85 = 5.24 kg


10.00 = 100.00 x 0.01 x 5.00 x 1.85 = 5.70 kg
10.00 = 100.00 x 0.01 x 10.00 x 0.55 = 3.39 kg
10.00 = 100.00 x 0.01 x 5.00 x 1.55 = 4.78 kg
10.00 = 100.00 x 0.01 x 20.00 x 0.76 = 9.31 kg
8.00 = 64.00 x 0.01 x 6.00 x 3.30 = 7.81 kg
36.23 kg
1 Lbg = 0.25 m3
1 m3 = 4.02 lbg
Besi = 145.75 kg
Bekisting = 8.21 m2

Kolom Tangga 20x20


Panjang Lebar Tebal/Tinggi Jumlah
Volume Pekerjaan = 0.20 x 0.20 x 1.75 x 2.00 = 0.14 m3

Pek. Balok Tangga 20/30


Panjang Lebar Tebal/Tinggi
Leheran = 3.10 x 0.20 x 0.30 = 0.19 m3

Pek. Plat Beton Tangga T. 12 Cm


Panjang Lebar Tebal/Tinggi
Leheran = 10.57 x 1.10 x 0.12 = 1.40 m3

Pek. Tangga Beton 25/40, Plat T. 12 Cm


Vol. Anak Tangga & Plat = 0.25 x 0.40 / 2.00
= 0.05 x 1.10 = 0.06 m3
= 0.06 x 16.00 = 0.88 m3

8.00 = 64.00 x 0.01 x 3.00 x 1.10 = 1.30 kg


8.00 = 64.00 x 0.01 x 7.33 x 0.82 = 2.37 kg
3.67 kg
1 m' = 0.05 m2
1 m3 = 20.00 m'
Besi = 73.49 kg
Bekisting = 6.00 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Balok Lantai 30/45 M3 8.58 M3 Pekerjaan Balok Lantai 30/45


Panjang = Horizontal Vertikal Jumlah
GAMBAR = 4.10 x x 8.00 = 32.80 m'
= 5.13 x x 6.00 = 30.78 m'
63.58 m'

Panjang Lebar Tebal/Tinggi


Leheran = 63.58 x 0.30 x 0.45 = 8.58 m3

Dimensi tinggi balok Induk & anak diperkirakan h = (1/10 – 1/15) L dan lebar balok anak b = (1/2 – 2/3) h (Vis dan Gideon, 1997).
Indeks Mutu Beton
Rasio Penulangan ( r ) = 1.40 x 300.00 = 0.005

Jari Jari Indeks


Diameter Besi 16.00 = 8.00 x 8.00 x 3.14 = 200.96 mm2 (Luas Penampang Besi)

Lapangan = Rasio ( r ) x 4.00 x L. Balok x T. Balok - Selimut (5 cm)


= 0.005 4.00 300.00 400.00
= 2,240.00 / (Luas Penampang Besi)
= 2,240.00 / 200.96
= 11 btg

16.00 = 256.00 x 0.01 x 12.00 x 1.00 = 18.94 kg


8.00 = 64.00 x 0.01 x 8.00 x 1.40 = 4.42 kg
23.36 kg
Panjang Pek. Pembesian = 61.20 + 9.30 = 70.50 m'
Total Pembesian = 1,646.74 kg
1 m' = 0.14 m2
1 m3 = 7.41 m'
Besi = 191.85 kg
Bekisting = 7.11 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Balok Lantai 25/40 M3 6.32 M3 Pekerjaan Balok Lantai 25/40


Panjang = Horizontal Vertikal Jumlah
GAMBAR = x 3.20 x 3.00 = 9.60 m'
= x 3.10 x 3.00 = 9.30 m'
= x 2.95 x 3.00 = 8.85 m'
= x 3.20 x 3.00 = 9.60 m'
= x 3.20 x 3.00 = 9.60 m'
= x 3.20 x 3.00 = 9.60 m'
= x 3.40 x 3.00 = m'
= x 3.30 x 2.00 = 6.60 m'
= x 3.20 x 1.00 = m'
63.15 m'

Panjang Lebar Tebal/Tinggi


Leheran = 63.15 x 0.25 x 0.40 = 6.32 m3

Dimensi tinggi balok Induk & anak diperkirakan h = (1/10 – 1/15) L dan lebar balok anak b = (1/2 – 2/3) h (Vis dan Gideon, 1997).
Indeks Mutu Beton
Rasio Penulangan ( r ) = 1.40 x 300.00 = 0.005

Jari Jari Indeks


Diameter Besi 16.00 = 8.00 x 8.00 x 3.14 = 200.96 mm2 (Luas Penampang Besi)

Lapangan = Rasio ( r ) x 4.00 x L. Balok x T. Balok - Selimut (5 cm)


= 0.005 4.00 250.00 350.00
= 1,633.33 / (Luas Penampang Besi)
= 1,633.33 / 200.96
= 8 btg

16.00 = 256.00 x 0.01 x 8.00 x 1.00 = 12.63 kg


12.00 = 144.00 x 0.01 x 4.00 x 1.00 = 3.55 kg
8.00 = 64.00 x 0.01 x 8.00 x 1.20 = 3.79 kg
19.96 kg
Panjang Pek. Pembesian = 75.00 m'
Total Pembesian = 1,497.36 kg
1 m' = 0.10 m2
1 m3 = 10.00 m'
Besi = 237.11 kg
Bekisting = 8.10 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Balok Lantai & Tangga 20/30 M3 0.42 M3 Pekerjaan Balok Lantai & Tangga 20/30
Panjang = Horizontal Vertikal Jumlah
GAMBAR = 3.25 x x 2.00 = m'
= 3.10 x x 2.00 = m'
= 3.30 x x 3.00 = m'
= 3.45 x x 2.00 = m'
= 3.05 x x 1.00 = m'
= 1.80 x x 1.00 = 1.80 m'
= 5.25 x x 1.00 = 5.25 m'
7.05 m'

Panjang Lebar Tebal/Tinggi


Leheran = 7.05 x 0.20 x 0.30 = 0.42 m3

Dimensi tinggi balok Induk & anak diperkirakan h = (1/10 – 1/15) L dan lebar balok anak b = (1/2 – 2/3) h (Vis dan Gideon, 1997).
Indeks Mutu Beton
Rasio Penulangan ( r ) = 1.40 x 300.00 = 0.005

Jari Jari Indeks


Diameter Besi 16.00 = 8.00 x 8.00 x 3.14 = 200.96 mm2 (Luas Penampang Besi)

Lapangan = Rasio ( r ) x 4.00 x L. Balok x T. Balok - Selimut (5 cm)


= 0.005 4.00 200.00 250.00
= 933.33 / (Luas Penampang Besi)
= 933.33 / 200.96
= 5 btg

16.00 = 256.00 x 0.01 x 4.00 x 1.00 = 6.31 kg


12.00 = 144.00 x 0.01 x 4.00 x 1.00 = 3.55 kg
8.00 = 64.00 x 0.01 x 6.67 x 0.88 = 2.31 kg
12.18 kg
Panjang Pek. Pembesian = 25.15 + 7.25 + 7.65 + 7.05
= 47.10 m'
Total Pembesian = 573.62 kg
1 m' = 0.06 m2
1 m3 = 16.67 m'
Besi = 1,356.07 kg
Bekisting = 9.33 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Beton Plat Lantai T. 12 Cm M3 19.89 M3 Pekerjaan Beton Plat Lantai T. 12 Cm

GAMBAR Luas Jumlah Tebal


Volume Pekerjaan = 8.28 x 2.00 x 0.12 = 1.99 m3
= 7.86 x 2.00 x 0.12 = 1.89 m3
= 6.36 x 1.00 x 0.12 = 0.76 m3
= 6.60 x 1.00 x 0.12 = 0.79 m3
= 6.27 x 1.00 x 0.12 = 0.75 m3
= 6.04 x 1.00 x 0.12 = 0.72 m3
= 5.94 x 1.00 x 0.12 = 0.71 m3
= 6.16 x 1.00 x 0.12 = 0.74 m3
= 6.67 x 3.00 x 0.12 = 2.40 m3
= 6.43 x 3.00 x 0.12 = 2.31 m3
= 6.75 x 1.00 x 0.12 = 0.81 m3
= 7.01 x 1.00 x 0.12 = 0.84 m3
= 8.79 x 2.00 x 0.12 = 2.11 m3
= 8.37 x 2.00 x 0.12 = 2.01 m3
= 4.35 x 2.00 x 0.12 = 1.04 m3
= x x 0.12 = - m3
19.89 m3

Penulangan Vertikal = 10.13 x 84.60 = 857.00 m'


= 10.13 x 84.60 = 857.00 m'
= 4.68 x 41.35 = 193.52 m'
= 4.68 x 41.35 = 193.52 m'
Penulangan Horizontal = 25.18 x 23.40 = 589.21 m'
= 25.18 x 23.40 = 589.21 m'
= 16.91 x 27.30 = 461.64 m'
= 16.91 x 27.30 = 461.64 m'
= 4,202.74 m'
8.00 = 64.00 x 0.01 x 1.00 x 4,202.74 = 1,658.23 kg

1 m' = 0.12 m2
1 m3 = 8.33 m'
Besi = 83.38 kg
Bekisting = 8.33 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 4.13 M3 #NAME?

GAMBAR Panjang Lebar Tebal


Volume Pekerjaan = 63.50 x 0.65 x 0.10 = 4.13 m3

12.00 = 144.00 x 0.01 x 10.00 x 1.64 = 14.56 kg


8.00 = 64.00 x 0.01 x 14.00 x 1.00 = 5.52 kg
20.08 kg
1 m' = 0.07 m2
1 m3 = 15.38 m'
Besi = 308.97 kg
Bekisting = 11.54 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 2.44 M3 #NAME?

GAMBAR Panjang Pekerjaan = 5.80 + 2.90 x 7.00


= 8.70 x 7.00 = 60.90 m'
Panjang Lebar Tebal
Volume Pekerjaan = 60.90 x 0.40 x 0.10 = 2.44 m3

10.00 = 100.00 x 0.01 x 10.00 x 1.14 = 7.03 kg


8.00 = 64.00 x 0.01 x 8.00 x 1.00 = 3.16 kg
10.18 kg
1 m' = 0.04 m2
1 m3 = 25.00 m'
Besi = 254.61 kg
Bekisting = 12.50 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan kolom 40x40 (Lantai 2) M3 14.72 M3 Pekerjaan kolom 40x40 (Lantai 2)

GAMBAR Panjang Lebar Tebal/Tinggi Jumlah


Volume Pekerjaan = 0.40 x 0.40 x 4.00 x 8.00 = 5.12 m3
= 0.40 x 0.40 x 4.00 x 7.00 = 4.48 m3
= 0.40 x 0.40 x 4.00 x 8.00 = 5.12 m3
14.72
Luas Penampang = 40.00 x 40.00 = 1,600.00 cm2
Toleransi Min 1% = 16.00 Min Luas Penampang Besi Pokok 1.75%
Jari Jari Indeks
16.00 = 0.80 x 0.80 x 3.14 = 2.01 cm2 (Luas Penampang Besi)
Jumlah Besi Digunakan = Toleransi <= Luas Penampang Besi
Toleransi Jumlah
16.00 = 2.01 x 16.08 = 8 btg
16.00 <= 16.08

16.00 = 256.00 x 0.01 x 4.00 x 1.00 = 6.31 kg


12.00 = 144.00 x 0.01 x 4.00 x 1.00 = 3.55 kg
8.00 = 64.00 x 0.01 x 6.67 x 1.50 = 3.95 kg
13.81 kg
1 m' = 0.16 m2
1 m3 = 6.25 m'
Besi = 86.31 kg
Bekisting = 10.00 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 0.29 M3 #NAME?

GAMBAR Panjang Lebar Tebal/Tinggi Jumlah


Volume Pekerjaan = 0.30 x 0.13 x 3.70 x 2.00 = 0.29 m3
= x x x = - m3
= x x x = - m3
0.29
Luas Penampang = 20.00 x 20.00 = 400.00 cm2
Toleransi Min 1% = 4.00 Min Luas Penampang Besi Pokok 1.75%
Jari Jari Indeks
10.00 = 0.50 x 0.50 x 3.14 = 0.79 cm2 (Luas Penampang Besi)
Jumlah Besi Digunakan = Toleransi <= Luas Penampang Besi
Toleransi Jumlah
10.00 = 0.79 x 4.71 = 6 btg
4.00 <= 4.71
10.00 = 100.00 x 0.01 x 8.00 x 1.00 = 4.93 kg
6.00 = 36.00 x 0.01 x 6.67 x 0.68 = 1.01 kg
5.94 kg
1 m' = 0.04 m2
1 m3 = 25.64 m'
Besi = 152.26 kg
Bekisting = 20.51 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

` NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan kolom praktis M3 1.37 M3 Pekerjaan kolom praktis

GAMBAR Volume Pekerjaan Panjang Lebar Tebal/Tinggi Jumlah


= 0.12 x 0.12 x 3.70 x 5.00 = 0.27 m3

= 0.12 x 0.12 x 3.45 x 3.00 = 0.15 m3

= 0.12 x 0.12 x 3.20 x 16.00 = 0.74 m3

= 0.12 x 0.12 x 3.80 x 4.00 = 0.22 m3

1.37 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 0.88 M3 #NAME?

GAMBAR Pek. Tebeng Layar = 4.10 + 3.45 + 3.20 = 10.75 m'


= 3.20 + 3.20 + 2.95 = 9.35 m'
= 3.00 + 4.10 + = 7.10 m'
27.20 m'

Panjang Lebar Tebal/Tinggi


Leheran = 27.20 x 0.13 x 0.25 = 0.88 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 1.85 M3 #NAME?


Panjang = 4.10 + 3.45 + 3.20 = 10.75 m'
GAMBAR = 3.20 + 3.20 + 2.95 = 9.35 m'
= 3.00 + 4.10 + 3.45 = 10.55 m'
= 3.20 + 3.20 + 3.20 = 9.60 m'
= 2.95 + 3.00 + 3.25 = 9.20 m'
49.45 m'
Panjang Lebar Tebal/Tinggi
Leheran = 49.45 x 0.15 x 0.25 = 1.85 m3

Dimensi tinggi balok Induk & anak diperkirakan h = (1/10 – 1/15) L dan lebar balok anak b = (1/2 – 2/3) h (Vis dan Gideon, 1997).
Indeks Mutu Beton
Rasio Penulangan ( r ) = 1.40 x 300.00 = 0.005

Jari Jari Indeks


Diameter Besi 16.00 = 8.00 x 8.00 x 3.14 = 200.96 mm2 (Luas Penampang Besi)

Lapangan = Rasio ( r ) x 4.00 x L. Balok x T. Balok - Selimut (5 cm)


= 0.005 4.00 200.00 250.00
= 933.33 / (Luas Penampang Besi)
= 933.33 / 200.96
= 5 btg

12.00 = 144.00 x 0.01 x 4.00 x 1.00 = 3.55 kg


12.00 = 144.00 x 0.01 x 4.00 x 1.00 = 3.55 kg
8.00 = 64.00 x 0.01 x 6.67 x 0.68 = 1.79 kg
8.89 kg
Panjang Pek. Pembesian = 25.15 + 7.25 + 7.65 + 7.05
= 47.10 m'
Total Pembesian = 418.75 kg
1 m' = 0.04 m2
1 m3 = 26.67 m'
Besi = 225.82 kg
Bekisting = 17.33 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 0.21 M3 #NAME?


Panjang = 3.27 + 3.00 + 0.97 = 7.24 m'
GAMBAR 1.77 + 1.87 + = 3.64 m'
+ + = - m'
10.88 m'

Panjang Lebar Tebal/Tinggi


Leheran = 10.88 x 0.13 x 0.15 = 0.21 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan balok Latei 20/30 M3 5.14 M3 Pekerjaan balok Latei 20/30


Panjang = 3.10 + 3.10 + 3.10 = 9.30 m'
GAMBAR 3.10 + 3.10 + 3.10 = 9.30 m'
3.10 + 3.10 + 3.10 = 9.30 m'
3.10 + 3.10 + 3.10 = 9.30 m'
3.10 + 3.10 + 3.10 = 9.30 m'
3.10 + 3.10 + 2.60 = 8.80 m'
2.60 + 2.60 + 4.10 = 9.30 m'
4.10 + 4.10 + = 8.20 m'
72.80 m'

Panjang Lebar Tebal/Tinggi


Volume = 72.80 x 0.20 x 0.30 = 4.37 m3
= 15.40 x 0.20 x 0.25 = 0.77 m3
5.14 m3
Indeks Mutu Beton
Rasio Penulangan ( r ) = 1.40 x 300.00 = 0.005

Jari Jari Indeks


Diameter Besi 16.00 = 8.00 x 8.00 x 3.14 = 200.96 mm2 (Luas Penampang Besi)

Lapangan = Rasio ( r ) x 4.00 x L. Balok x T. Balok - Selimut (5 cm)


= 0.005 4.00 200.00 250.00
= 933.33 / (Luas Penampang Besi)
= 933.33 / 200.96
= 5 btg

16.00 = 256.00 x 0.01 x 6.00 x 1.00 = 9.47 kg


10.00 = 100.00 x 0.01 x 3.00 x 1.00 = 1.85 kg
8.00 = 64.00 x 0.01 x 6.67 x 0.88 = 2.31 kg
13.63 kg
1 m' = 0.06 m2
1 m3 = 16.67 m'
Besi = 227.23 kg
Bekisting = 13.33 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan balok gantung 20/30 M3 2.46 M3 Pekerjaan balok gantung 20/30


Panjang = 3.40 + 3.20 + 3.20 = 9.80 m'
GAMBAR = 3.20 + 2.95 + 6.62 = 12.77 m'
= 5.13 + 5.13 + 4.10 = 14.36 m'
= 4.10 = 4.10 m'
= + + = - m'
41.03 m'

Panjang Lebar Tebal/Tinggi


Leheran = 41.03 x 0.20 x 0.30 = 2.46 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 3.77 M3 #NAME?


Panjang = 3.40 + 3.20 + 3.20 = 9.80 m'
GAMBAR 3.20 + 2.95 + 3.00 = 9.15 m'
3.22 + 4.10 + 5.13 = 12.45 m'
3.40 + 3.20 + 3.20 = 9.80 m'
3.20 + 2.95 + 3.00 = 9.15 m'
3.22 + 4.10 + 5.13 = 12.45 m'
+ + = - m'
62.80 m'

Panjang Lebar Tebal/Tinggi


Leheran = 62.80 x 0.20 x 0.30 = 3.77 m3

Indeks Mutu Beton


Rasio Penulangan ( r ) = 1.40 x 300.00 = 0.005

Jari Jari Indeks


Diameter Besi 12.00 = 6.00 x 6.00 x 3.14 = 113.04 mm2 (Luas Penampang Besi)

Lapangan = Rasio ( r ) x 4.00 x L. Balok x T. Balok - Selimut (5 cm)


= 0.005 4.00 200.00 250.00
= 933.33 / (Luas Penampang Besi)
= 933.33 / 113.04
= 8 btg

12.00 = 144.00 x 0.01 x 8.00 x 1.00 = 7.10 kg


8.00 = 64.00 x 0.01 x 6.67 x 0.88 = 2.31 kg
9.42 kg
1 m' = 0.06 m2
1 m3 = 16.67 m'
Besi = 156.95 kg
Bekisting = 8.33 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- #NAME? M3 0.80 M3 #NAME?


Panjang = 5.37 + 4.10 + 4.37 = 13.84 m'
GAMBAR 3.40 + 3.40 + 6.23 = 13.03 m'
1.87 + 1.87 + = 3.74 m'
+ + = - m'
+ + = - m'
+ + = - m'
+ + = - m'
30.61 m'

Panjang Lebar Tebal/Tinggi


Leheran = 30.61 x 0.13 x 0.20 = 0.80 m3

Indeks Mutu Beton


Rasio Penulangan ( r ) = 1.40 x 300.00 = 0.005

Jari Jari Indeks


Diameter Besi 12.00 = 6.00 x 6.00 x 3.14 = 113.04 mm2 (Luas Penampang Besi)

Lapangan = Rasio ( r ) x 4.00 x L. Balok x T. Balok - Selimut (5 cm)


= 0.005 4.00 200.00 250.00
= 933.33 / (Luas Penampang Besi)
= 933.33 / 113.04
= 8 btg

12.00 = 144.00 x 0.01 x 4.00 x 1.00 = 3.55 kg


6.00 = 36.00 x 0.01 x 6.67 x 0.58 = 0.86 kg
4.41 kg
1 m' = 0.03 m2
1 m3 = 38.46 m'
Besi = 169.58 kg
Bekisting = 15.38 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Kolom Plat Beton 15/70 M3 8.19 M3 Pek. Kolom Plat Beton 15/70

GAMBAR Panjang Tinggi Tebal Jumlah


Volume Pekerjaan = 0.70 x 7.80 x 0.15 x 10.00 = 8.19 m3

12.00 = 144.00 x 0.01 x 13.33 x 0.98 = 11.54 kg


8.00 = 64.00 x 0.01 x 8.00 x 1.00 = 3.16 kg
14.70 kg
1 m' = 0.11 m2
1 m3 = 9.52 m'
Besi = 139.97 kg
Bekisting = 14.76 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Beton Plat Dak T. 10 Cm M3 4.00 M3 Pek. Beton Plat Dak T. 10 Cm

GAMBAR Panjang Lebar Tebal Jumlah


Volume Pekerjaan = 3.40 x 0.70 x 0.10 x 8.00 = 1.90 m3
= 3.30 x 0.70 x 0.10 x 5.00 = 1.16 m3
= 5.80 x 0.70 x 0.10 x 1.00 = 0.41 m3
= 2.80 x 0.70 x 0.10 x 1.00 = 0.20 m3
= 4.90 x 0.70 x 0.10 x 1.00 = 0.34 m3
4.00 m3

12.00 = 144.00 x 0.01 x 6.67 x 1.21 = 7.16 kg


12.00 = 144.00 x 0.01 x 6.67 x 0.99 = 5.86 kg
8.00 = 64.00 x 0.01 x 10.00 x 1.00 = 3.95 kg
16.97 kg
1 m' = 0.07 m2
1 m3 = 14.29 m'
Besi = 242.37 kg
Bekisting = 10.00 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### #NAME? M2 116.15 M2 #NAME?


Panjang Tinggi
GAMBAR Volume 1 = 5.22 x 3.50 = 18.27 m2
Volume 1 = 5.49 x 3.50 = 19.22 m2
Volume 1 = 3.60 x 1.20 = 4.32 m2
Volume 1 = 4.24 x 1.20 = 5.09 m2
Volume 1 = 9.97 x 1.20 = 11.96 m2
Volume 1 = 5.57 x 3.50 = 19.50 m2
Volume 1 = 5.14 x 1.20 = 6.17 m2
Volume 1 = 4.20 x 3.50 = 14.70 m2
Volume 1 = 5.34 x 1.20 = 6.41 m2
Volume 1 = 5.77 x 3.50 = 20.20 m2
Pek. Pintu = 4.50 x (2.15) = (9.68) m2
Volume 1 = x = - m2
Volume 1 = x = - m2
= 116.15 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### #NAME? M2 64.29 M2 #NAME?


Panjang Tinggi
GAMBAR Volume 1 = 8.66 x 1.20 = 10.39 m2
Volume 1 = 6.32 x 3.50 = 22.12 m2
Volume 1 = 13.55 x 1.20 = 16.26 m2
Volume 1 = 5.54 x 3.50 = 19.39 m2
Pek. Pintu = 1.80 x (2.15) = (3.87) m2
Volume 1 = x = - m2
Volume 1 = x = - m2
= 64.29 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

### Pas. Batu kali 1 : 4 M3 4.34 M3 Pas. Batu kali 1 : 4

GAMBAR Panjang = 5.90 + 1.50 + 1.50 + 1.50 + 3.67


1.00 + 1.00 + + +
= 16.07 m'
Lebar Atas = 0.30 m'
Lebar Bawah= 0.60 m'
Tinggi = 0.60 m'

Volume = Panjang x ((L.a+L.b)/2) x Tinggi


= 16.07 x 0.45 x 0.60
= 4.34 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Pas. Batu-bata 1 : 2, T. 50 Cm M2 2.95 M2 Pek. Pas. Batu-bata 1 : 2, T. 50 Cm


Panjang Horizontal = 3.24 + + + +
GAMBAR + + + +
Vertikal = 1.50 + 0.58 + 0.58 + +
+ + + +
+ + + +
Total = 5.90 m'
Tinggi = 0.50 m'
Volume = Panjang x Tinggi
= 5.90 x 0.50
= 2.95 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Pas. Batu-bata 1 : 4 M2 141.07 M2 Pek. Pas. Batu-bata 1 : 4


Panjang Tinggi
GAMBAR Volume Pekerjaa 1 = 4.83 x 3.55 = 17.15 m2
2 = 4.83 x 3.55 = 17.15 m2
3 = 1.12 x 3.88 = 4.35 m2
4 = 1.12 x 3.88 = 4.35 m2
5 = 1.38 x = - m2 jendela 2 lbg
6 = 1.38 x = - m2 jendela 2 lbg
7 = 1.38 x = - m2 jendela 2 lbg
8 = 1.38 x = - m2 jendela 2 lbg
9 = 4.96 x 3.88 = 19.24 m2
10 = 3.38 x 3.25 = 10.99 m2
11 = 3.00 x 3.35 = 10.05 m2
12 = 3.61 x 3.60 = 13.00 m2
13 = 1.38 x = - m2
14 = 2.95 x 3.35 = 9.88 m2
15 = 4.34 x 3.55 = 15.41 m2
16 = 2.44 x 3.30 = 8.05 m2
17 = 2.17 x 3.55 = 7.70 m2
18 = 0.97 x 3.55 = 3.44 m2
19 = 3.00 x 3.65 = 10.95 m2
20 = 1.50 x 3.05 = 4.58 m2
21 = x = - m2
22 = x = - m2
23 = x = - m2
24 = x = - m2
25 = x = - m2
156.27 m2

Pekerjaan Pengurangan Lebar Tinggi Jumlah


= 0.90 x 2.15 x 3.00 = 5.81 m2
= 1.50 x 2.15 x 2.00 = 6.45 m2
= x x = - m2
= x x = - m2
= x x = - m2
= x x = - m2
= x x = - m2
= x x = - m2
= x x = - m2
= x x = - m2
= x x = - m2
= x x = - m2
= x x = - m2
= x x = - m2
Bukaan = x x = - m2
Pas. Batu-bata 1 : 2 = 2.95 m2
15.21 m2

Volume Pas. Bata 1 : 4 = 156.27 - 15.21


= 141.07 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Plesteran 1 :2 M2 61.21 M2 Pek. Plesteran 1 :2


Panjang Horizontal = 3.10 + 0.80 + 3.84 + 1.87 + 3.10
GAMBAR 1.74 + 1.87 + 1.74 + 3.10 + 3.10
Vertikal = 3.10 + 2.97 + 2.97 + 2.97 + 3.10
3.24 + 3.10 + 3.10 + 3.10 + 3.10
3.10 + 3.10 + + +
Total = 61.21 m'
Tinggi = 0.50 m'
Volume = Panjang x Tinggi x J. sisi
= 61.21 x 0.50 x 2.00
= 61.21 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Plesteran 1 :4 M2 220.03 M2 Pek. Plesteran 1 :4

GAMBAR Pek. Pas. Bata 1 : 4 = 141.07 m2


Plesteran = 141.07 x 2.00
= 282.14 m2
Pek. Pengurangan
Wc1 = 6.18 x 1.20 = 7.42 m2
Wc2 = 5.66 x 1.20 = 6.79 m2
Wc3 = 5.66 x 1.20 = 6.79 m2
Granit 60x60 = 7.50 x 3.50 = 26.25 m2
= 1.90 x 2.35 = 4.47 m2
Pas. Batu Andesit = 10.39 x 1.00 = 10.39 m2
= x = - m2
62.11 m2
Volume Ples = 282.14 - 62.11
= 220.03 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Plesteran Timbul Variasi 3-5 Cm, 1 : 2 M2 18.82 M2 Pek. Plesteran Timbul Variasi 3-5 Cm, 1 : 2
Panjang Tinggi Tebal/1.5
GAMBAR Volume = 7.32 x 0.40 x 2.00 = 5.86 m2
= 8.10 x 0.40 x 4.00 = 12.96 m2
= 18.82 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Pas. Batu-bata 1 : 4 (Lantai 2) M2 242.15 M2 Pek. Pas. Batu-bata 1 : 4 (Lantai 2)


Panjang Panjang Tinggi
GAMBAR Horizontal = 5.00 x 3.70 x 2.00 = 37.00 m2
= 3.97 x 3.20 x 2.00 = 25.41 m2
= 3.47 x 3.20 x 1.00 = 11.10 m2
= 3.20 x 3.20 x 3.00 = 30.72 m2
= 2.95 x 3.20 x 1.00 = 9.44 m2
= 3.00 x 3.20 x 1.00 = 9.60 m2
= 3.27 x 3.70 x 1.00 = 12.10 m2
= 6.41 x 3.55 x 1.00 = 22.76 m2
= 3.97 x 3.70 x 1.00 = 14.69 m2
= 6.15 x 1.00 x 1.00 = 6.15 m2
= 5.00 x 3.57 x 1.00 = 17.85 m2
= 4.37 x 3.80 x 2.00 = 33.21 m2
= 3.40 x 3.80 x 2.00 = 25.84 m2
= 1.87 x 3.65 x 3.00 = 20.48 m2
= 1.64 x 3.65 x 1.00 = 5.99 m2
= x x = - m2
282.33 m2
Pekerjaan Pengurangan Lebar Tinggi Jumlah
= 2.96 x 1.45 x 7.00 = 30.04 m2
= 0.80 x 2.15 x 5.00 = 8.60 m2
= 1.54 x 0.50 x 2.00 = 1.54 m2
= x x = - m2
40.18 m2
Volume Pas. Bata 1 : 4 = 282.33 - 40.18
= 242.15 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Plesteran 1 : 4 (lantai 2) M2 #REF! M2 Pek. Plesteran 1 : 4 (lantai 2)


Panjang Panjang Tinggi
GAMBAR Horizontal = 3.10 x 3.75 x 4.00 = 46.50 m2
3.20 x 3.75 x 3.00 = 36.00 m2
2.70 x 3.75 x 2.00 = 20.25 m2
21.07 x 3.75 x 1.00 = 79.01 m2
2.70 x 0.60 x 2.00 = 3.24 m2
4.10 x 0.60 x 1.00 = 2.46 m2
Vertikal = 3.10 x 3.75 x 10.00 = 116.25 m2
= 3.30 x 3.75 x 7.00 = 86.63 m2
= 3.20 x 3.75 x 1.00 = 12.00 m2
= 2.98 x 3.75 x 1.00 = 11.18 m2
= 3.18 x 3.75 x 1.00 = 11.93 m2
= 3.10 x 0.60 x 1.00 = 1.86 m2
Tebeng Layar = 3.10 x 1.79 / 2.00 = 2.77 m2
= 3.20 x 1.88 / 2.00 = 3.01 m2
= 2.80 x 2.00 / 2.00 = 2.80 m2
= 3.20 x 1.87 x 1.00 = 5.98 m2
= 2.80 x 1.87 x 1.00 = 5.24 m2
447.10 m2
Pekerjaan Pengurangan Lebar Tinggi Jumlah
Pintu P1 = 1.50 x 2.15 x 2.00 = 6.45 m2
= 1.50 x 0.50 x 2.00 = 1.50 m2
Pintu P2 = 0.90 x 2.15 x 5.00 = 9.68 m2
= 0.90 x 0.50 x 5.00 = 2.25 m2
Jalusi = 0.60 x 0.50 x 37.00 = 11.10 m2
Jendela mati 1 = 2.15 x 2.15 x 1.00 = 4.62 m2
Jendela mati 2 = 2.85 x 3.10 x 1.00 = 8.84 m2
B. Latei 10/15 = #REF! x 0.15 x 1.00 = #REF! m2
B. Latei 10/15 = - x 0.15 x 1.00 = - m2
#REF! m2
Volume Pas. Bata 1 : 4 = 447.10 - #REF!
= #REF! m2

Pek. Batu Andesit = #NAME? m2


Pas. Keramik = #NAME? m2
Plesteran Tebeng Layar = 19.80 m2
#NAME? m2
Volume Plesteran = #REF! x 2.00 - #NAME?
= #REF! - #NAME?
= #REF!

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Kusen Pintu Alumunium 4" M' 360.76 M' Pek. Kusen Pintu Alumunium 4"
Horizontal Vertikal Jumlah
GAMBAR Pintu P1 = 0.90 + 4.20 x 8.00 = 40.80 m'
= + x = - m'
Pintu P2 = 1.50 + 4.20 x 4.00 = 22.80 m'
= + x = - m'
Pintu P3 = 0.80 + 4.20 x 2.00 = 10.00 m'
Jendela J1 = 10.80 + 11.00 x 13.00 = 283.40 m'
= + x = - m'
Jalusi = 2.56 + 1.20 x 1.00 = 3.76 m'
= + x = - m'
= + x = - m'
360.76 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Kusen Pintu Alumunium 4" (Lantai 2) M' 164.12 M' Pek. Kusen Pintu Alumunium 4" (Lantai 2)
Horizontal Vertikal Jumlah
GAMBAR Pintu P1 = 0.90 + 4.20 x 5.00 = 25.50 m'
= + x = - m'
Pintu P2 = + x = - m'
= + x = - m'
Pintu P3 = 0.80 + 4.20 x 2.00 = 10.00 m'
Jendela J2 = 10.80 + 6.50 x 7.00 = 121.10 m'
= + x = - m'
Jalusi = 2.56 + 1.20 x 2.00 = 7.52 m'
= + x = - m'
= + x = - m'
164.12 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Daun Pintu Kaca Rangka Alumunium M2 37.56 M2 Pekerjaan Daun Pintu Kaca Rangka Alumunium
Horizontal Vertikal Jumlah
GAMBAR Pintu P1 = 0.82 + 2.11 x 8.00 = 23.44 m2
Pintu P2 = 1.42 + 2.11 x 4.00 = 14.12 m2
Pintu PJ = + x = - m2
37.56 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Daun Jendela Kaca Rangka Alumunium M2 43.48 M2 Pekerjaan Daun Jendela Kaca Rangka Alumunium
Horizontal Vertikal Jumlah
GAMBAR J1 = 0.62 + 0.90 x 26.00 = 39.52 m2
Jalusi = 0.57 + 0.42 x 4.00 = 3.96 m2
43.48 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Daun Pintu Kaca Rangka Alumunium (Lantai 2) M2 14.65 M2 Pekerjaan Daun Pintu Kaca Rangka Alumunium (Lantai 2)
Horizontal Vertikal Jumlah
GAMBAR Pintu P1 = 0.82 + 2.11 x 5.00 = 14.65 m2
Pintu P2 = + x = - m2
14.65 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Daun Jendela Kaca Rangka Alumunium (Lantai 2) M2 25.24 M2 Pekerjaan Daun Jendela Kaca Rangka Alumunium (Lantai 2)
Horizontal Vertikal Jumlah
GAMBAR J1 = 0.62 + 0.90 x 14.00 = 21.28 m2
Jalusi = 0.57 + 0.42 x 4.00 = 3.96 m2
25.24 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Daun Pintu Alumunium Strip M2 5.46 M2 Pekerjaan Daun Pintu Alumunium Strip
Horizontal Vertikal Jumlah
GAMBAR Pintu P3 = 0.72 + 2.01 x 2.00 = 5.46 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pekerjaan Daun Pintu Alumunium Strip M2 5.46 M2 Pekerjaan Daun Pintu Alumunium Strip
Horizontal Vertikal Jumlah
GAMBAR Pintu P3 = 0.72 + 2.01 x 2.00 = 5.46 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Kaca Hidup Pintu Dan Jendela M2 10.24 M2 Pek. Kaca Hidup Pintu Dan Jendela
Horizontal Vertikal Jumlah
GAMBAR Jendela J1 = 0.48 x 0.78 x 26.00 = 9.73 m2
Jalusi = 0.45 x 0.28 x 4.00 = 0.50 m2
= x x = - m2
= x x = - m2
10.24 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Kaca Hidup Pintu Dan Jendela (Lantai 2) M2 5.75 M2 Pek. Kaca Hidup Pintu Dan Jendela (Lantai 2)
Horizontal Vertikal Jumlah
GAMBAR Jendela J2 = 0.48 x 0.78 x 14.00 = 5.24 m2
Jalusi = 0.45 x 0.28 x 4.00 = 0.50 m2
= x x = - m2
5.75 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Kaca Mati M2 56.42 M2 Pek. Kaca Mati


Horizontal Vertikal Jumlah
GAMBAR Jendela J1 = 0.62 x 0.90 x 52.00 = 29.02 m2
= 0.62 x 0.90 x 26.00 = 14.51 m2
= 0.62 x 0.40 x 52.00 = 12.90 m2
= x x = - m2
56.42 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Kaca Mati (Lantai 2) M2 14.76 M2 Pek. Kaca Mati (Lantai 2)


Horizontal Vertikal Jumlah
GAMBAR Jendela J2 = 0.62 x 0.90 x 14.00 = 7.81 m2
= 0.62 x 0.40 x 28.00 = 6.94 m2
= x x = - m2
= x x = - m2
14.76 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Lantai Granite 60x60 (Lantai 2) M2 238.06 M2 Pas. Lantai Granite 60x60 (Lantai 2)
Teras Depan = 27.25 m2
GAMBAR Gudang Syrup = 11.40 m2
Gudang Arsip = 11.40 m2
Gudang Cairan HD = 71.50 m2
Gudang BMHP = 22.33 m2
Gudang Obat Generik = 22.33 m2
Gudang Obat Branded = 14.77 m2
Lorong = 57.08 m2
238.06 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Dinding Granite 60x60 (Lantai 2) M2 28.14 M2 Pas. Dinding Granite 60x60 (Lantai 2)
Teras Depan = 17.34 m2
GAMBAR = 10.80 m2 10.24
= m2
28.14 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Batu Andesit (Lantai 2) M2 4.92 M2 Pas. Batu Andesit (Lantai 2)


Panjang Tinggi
GAMBAR Volume = 2.60 x 3.45 = 8.97 m2
= 1.50 x 2.70 = 4.05 m2
4.92 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Rangka Plafond M2 370.86 M2 Pek. Rangka Plafond

GAMBAR Volume 1.00 = 138.81 m2


= 108.28 m2
= 37.29 m2
= 15.37 m2
= 40.00 m2
= 4.79 m2
= 4.38 m2
= 21.94 m2
= m2
= m2
= m2
= m2
370.86 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Rangka Plafond M2 317.23 M2 Pek. Rangka Plafond

GAMBAR Volume = 81.61 m2


= 7.95 m2
= 7.08 m2
= 85.95 m2
= 32.41 m2
= 14.85 m2
= 5.61 m2
= 81.77 m2
= m2
317.23 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Plafond M2 370.86 M2 Pas. Plafond

GAMBAR Volume 1.00 = 138.81 m2


2.00 = 108.28 m2
3.00 = 37.29 m2
4.00 = 15.37 m2
5.00 = 40.00 m2
6.00 = 4.79 m2
7.00 = 4.38 m2
= 21.94 m2
= m2
= m2
= m2
= m2
370.86 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Plafond M2 235.46 M2 Pas. Plafond

GAMBAR Volume = 81.61 m2


= 7.95 m2
= 7.08 m2
= 85.95 m2
= 32.41 m2
= 14.85 m2
= 5.61 m2
= m2
235.46 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Rangka Baja Ringan C.75.75, Dudukan List Plafond M' 179.64 M' Pas. Rangka Baja Ringan C.75.75, Dudukan List Plafond

GAMBAR Volume Cairan Infus = 35.82 m'


R. Produksi - R. Peneriamaan = 44.46 m'
Gudang B3 = 13.20 m'
Ruang Adm = 20.74 m'
Ruang Steril = 15.20 m'
Ruang Handling = 15.20 m'
Ruang Ganti 1 = 5.20 m'
Ruang Ganti 2 = 5.20 m'
R. Persiapan = 11.20 m'
Ruang cuci = 6.71 m'
WC = 6.71 m'
179.64 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Baja Ringan C.75.75, Dudukan List Plafond (Lantai 2) M2 197.35 M2 Pas. Baja Ringan C.75.75, Dudukan List Plafond (Lantai 2)

GAMBAR Volume dang Syrup = 13.20 m'


Gudang Arsip = 12.93 m'
Gudang Cairan HD = 36.36 m'
Gudang BMHP = 19.23 m'
Gudang Obat Generik = 19.24 m'
Gudang Obat Branded = 15.20 m'
Lorong = 59.45 m'
Teras Depan = 21.74 m'
197.35 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Gypsum T.9 mm L. 7,5 Cm M2 11.69 M2 Pas. Gypsum T.9 mm L. 7,5 Cm

GAMBAR Volume Cairan Infus = 35.82 x 0.08 = 2.69 m2


R. Produksi - R. Peneriamaan = 44.46 x 0.08 = 3.33 m2
Gudang B3 = 13.20 x 0.08 = 0.99 m2
Ruang Adm = 20.74 x 0.08 = 1.56 m2
Ruang Steril = 15.20 x 0.08 = 1.14 m2
Ruang Handling = 15.20 x 0.08 = 1.14 m2
Ruang Ganti 1 = 5.20 x 0.08 = m2
Ruang Ganti 2 = 5.20 x 0.08 = m2
R. Persiapan = 11.20 x 0.08 = 0.84 m2
Ruang cuci = 6.71 x 0.08 = m2
WC = 6.71 x 0.08 = m2
11.69 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Gypsum T.9 mm L. 7,5 Cm (Lantai 2) M2 13.17 M2 Pas. Gypsum T.9 mm L. 7,5 Cm (Lantai 2)

GAMBAR Volume dang Syrup = 13.20 x 0.08 = 0.99 m2


Gudang Arsip = 12.93 x 0.08 = 0.97 m2
Gudang Cairan HD = 36.36 x 0.08 = 2.73 m2
Gudang BMHP = 19.23 x 0.08 = 1.44 m2
Gudang Obat Generik = 19.24 x 0.08 = 1.44 m2
Gudang Obat Branded = 15.20 x 0.08 = 1.14 m2
Lorong = 59.45 x 0.08 = 4.46 m2
Teras Depan = 21.74 x 0.08 = m2
13.17 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. List Plafond Gypsum M' 247.90 M' Pas. List Plafond Gypsum

GAMBAR Volume = 10.88 m'


= 67.75 m'
= 12.48 m'
= 15.92 m'
= 11.28 m'
= 26.90 m'
= 42.25 m'
= 12.28 m'
= 11.76 m'
= 11.55 m'
= 24.85 m'
= m'
247.90 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. List Plafond Gypsum (Lantai 2) M2 179.13 M2 Pas. List Plafond Gypsum (Lantai 2)

GAMBAR Volume = 45.60 m'


= 11.47 m'
= 10.81 m'
= 49.69 m'
= 32.54 m'
= 15.54 m'
= 6.48 m'
= 7.00 m'
= m'
179.13 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Plafond Gypsum T. 9 mm M' 42.68 M' Pas. Plafond Gypsum T. 9 mm

GAMBAR Volume Teras Depan = 33.14 m2


R. Ganti = 3.22 m2
WC = 2.54 m2
R. Cuci = 2.54 m2
Pantry = 1.24 m2
42.68 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Plafond Gypsum T. 9 mm (Lantai 2) M' 92.07 M' Pas. Plafond Gypsum T. 9 mm (Lantai 2)

GAMBAR Volume Teras Depan = 23.13 m2


Selasar = 68.94 m2
92.07 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Kuda-kuda & Rangka Atap Baja Ringan M2 400.70 M2 Pas. Kuda-kuda & Rangka Atap Baja Ringan

GAMBAR Bidang A = (Alas x Tinggi)/2


= 12.75 x 7.32 / 2.00
= 93.33 / 2.00
= 46.67 m2
Bidang B = (Alas x Tinggi)/2
= 12.75 x 7.32 / 2.00
= 93.33 / 2.00
= 46.67 m2
Bidang C = ((P.a + P.b)/2) x Tinggi
= 27.44 + 14.55 / 2.00 x 7.32
= 21.00 x 7.32
= 153.68 m2
Bidang D = ((P.a + P.b)/2) x Tinggi x Jumlah
= 27.44 + 14.55 / 2.00 x 7.32
= 21.00 x 7.32
= 153.68 m2
Jumlah Volume = 400.70 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Atap Genteng Metal Berpasir M2 416.16 M2 Pas. Atap Genteng Metal Berpasir

GAMBAR Bidang A = (Alas x Tinggi)/2


= 13.05 x 7.52 / 2.00
= 98.14 / 2.00
= 49.07 m2
Bidang B = (Alas x Tinggi)/2
= 13.05 x 7.52 / 2.00
= 98.14 / 2.00
= 49.07 m2
Bidang C = ((P.a + P.b)/2) x Tinggi
= 27.74 + 14.55 / 2.00 x 7.52
= 21.15 x 7.52
= 159.01 m2
Bidang D = ((P.a + P.b)/2) x Tinggi x Jumlah
= 27.74 + 14.55 / 2.00 x 7.52
= 21.15 x 7.52
= 159.01 m2
Jumlah Volume = 416.16 m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Listplank Kayu (3/15 & 3/25) M' 120.36 M' Pas. Listplank Kayu (3/15 & 3/25)

GAMBAR Volume = 26.68 + 26.68 + 12.16 + 12.16 +


27.68 + 7.50 + 7.50
= 120.36 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Bubungan Nok Bulat Genteng Metal Berpasir M' 46.50 M' Pas. Bubungan Nok Bulat Genteng Metal Berpasir

GAMBAR Volume = 14.50 + 8.00 + 8.00


8.00 + 8.00 +
= 46.50 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Kunci Double Cylinder "setara Dekson" Bh 11.00 Bh Pas. Kunci Double Cylinder "setara Dekson"

GAMBAR Pintu P1 = 4.00 bh


Pintu P2 = 5.00 bh
Pintu PJ = 2.00 bh
Pintu P3 = bh
11.00 bh

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Kunci Double Cylinder "setara Dekson" (Lantai 2) Bh 7.00 Bh Pas. Kunci Double Cylinder "setara Dekson" (Lantai 2)

GAMBAR Pintu P1 = 2.00 bh


Pintu P2 = 5.00 bh
Pintu P3 = bh
7.00 bh

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Engsel Pintu Alumunium 4 " setara "Dekson" Bh 51.00 Bh Pas. Engsel Pintu Alumunium 4 " setara "Dekson"
J. Engsel J. Daun J. Pintu
GAMBAR Pintu P1 = 3.00 x 2.00 x 4.00 = 24.00 m'
Pintu P2 = 3.00 x 1.00 x 5.00 = 15.00 m'
Pintu PJ = 3.00 x 1.00 x 2.00 = 6.00 m'
Pintu P3 = 3.00 x 1.00 x 2.00 = 6.00 m'
51.00 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Engsel Pintu Alumunium 4 " setara "Dekson" (Lantai 2) Bh 27.00 Bh Pas. Engsel Pintu Alumunium 4 " setara "Dekson" (Lantai 2)
J. Engsel J. Daun J. Pintu
GAMBAR Pintu P1 = 3.00 x 2.00 x 2.00 = 12.00 m'
Pintu P2 = 3.00 x 1.00 x 5.00 = 15.00 m'
27.00 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Engsel Casement 16 " setara "Dekson" Bh 12.00 Bh Pas. Engsel Casement 16 " setara "Dekson"
J. Engsel J. Daun J. Jendela
GAMBAR Jalusi = 2.00 x 1.00 x 6.00 = 12.00 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Engsel Casement 10 " setara "Dekson" Bh 78.00 Bh Pas. Engsel Casement 10 " setara "Dekson"
J. Engsel J. Daun J. Jalusi
GAMBAR Jalusi = 2.00 x 1.00 x 39.00 = 78.00 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Engsel Casement 10 " setara "Dekson" (Lantai 2) Bh 74.00 Bh Pas. Engsel Casement 10 " setara "Dekson" (Lantai 2)
J. Engsel J. Daun J. Jalusi
GAMBAR Jalusi = 2.00 x 1.00 x 37.00 = 74.00 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Handel Pintu Stainless Steel P. 30 - 40 Cm Bh 17.00 Bh Pas. Handel Pintu Stainless Steel P. 30 - 40 Cm
J. Handle J. Daun J. Pintu
GAMBAR Pintu P1 = 1.00 x 2.00 x 4.00 = 8.00 m'
Pintu P2 = 1.00 x 1.00 x 5.00 = 5.00 m'
Pintu PJ = 1.00 x 2.00 x 2.00 = 4.00 m'
17.00 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pas. Handel Pintu Stainless Steel P. 30 - 40 Cm Bh 9.00 Bh Pas. Handel Pintu Stainless Steel P. 30 - 40 Cm
J. Handle J. Daun J. Pintu
GAMBAR Pintu P1 = 1.00 x 2.00 x 2.00 = 4.00 m'
Pintu P2 = 1.00 x 1.00 x 5.00 = 5.00 m'
9.00 m'

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Cat Tembok Dan Kolom Bh #NAME? Bh Pek. Cat Tembok Dan Kolom

GAMBAR Luas Permukaan Tembok = #NAME? 12.00 #NAME? = #NAME? m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Cat List plafond & Listplank Bh #NAME? Bh Pek. Cat List plafond & Listplank

GAMBAR Listplafond Gypsum = #NAME? x 0.10 = m2


Listplafond Kayu = x 0.07 = m2
Listplank Kayu = #NAME? x 0.35 = #NAME? m2
Total Volume = #NAME? m2

BAHAN INDEKS VOLUME JUMLAH KETERANGAN

NO URAIAN PEKERJAAN KONTRAK ADD REALISASI HITUNGAN PEKERJAAN

- Pek. Saluran Type 30 Bh - Bh Pek. Saluran Type 30

GAMBAR Galian Tanah = 1.00 x 0.45 x 0.50 = 0.23 m3


Pas. Bata 1 : 2 = 1.00 x 0.45 x 2.00 = 0.90 m2
Pek. Plesteran = 1.00 x 1.10 = 1.10 m2
Pek. Acian = 1.00 x 1.10 = 1.10 m2
Urugan Pasir = 1.00 x 0.30 x 0.07 = 0.02 m3
Rabat Beton = 1.00 x 0.30 x 0.05 = 0.02 m3

BAHAN INDEKS VOLUME JUMLAH KETERANGAN