Anda di halaman 1dari 18

DAFTAR HARGA SATUAN BAHAN DAN UPAH

HARGA SAT.
NO. URAIAN SATUAN
(Rp)

1 2 4 3
UPAH TENAGA :
Tukang
1 Tukang kayu 134,000.00 hari
1 Tukang batu 134,000.00 hari
1 Tukang besi 134,000.00 hari
1 Tukang las 134,000.00 hari
2 Tukang cat 134,000.00 hari
2 Tukang plitur 134,000.00 hari
2 Tukang bor 134,000.00 hari
2 Tukang listrik 134,000.00 hari
2 Tukang pipa ledeng 134,000.00 hari
1 Tukang kapur 134,000.00 hari
1 Tukang gali 134,000.00 hari
2 Kepala tukang kayu 150,000.00 hari
2 Kepala tukang batu 150,000.00 hari
2 Kepala tukang besi 150,000.00 hari
2 Kepala tukang las 150,000.00 hari
3 Kepala tukang cat 150,000.00 hari
3 Kepala tukang plitur 150,000.00 hari
3 Kepala tukang bor 150,000.00 hari
3 Mandor 165,000.00 hari
4 Pekerja 125,500.00 hari
HARGA SATUAN
NO HARGA BAHAN MATERIAL SATUAN
(RP)
1 Tanah urug Pilihan 66,000.00 m³
2 Tanah urug 61,875.00 m³
3 Pasir urug 450,000.00 m³
4 Pasir batu (sirtu) 513,000.00 m³
5 Pasir pasang / Pasir Beton 500,000.00 m³
6 Batu gunung 450,000.00 m³
7 Batu belah 15/20 600,000.00 m³
8 Batu kali besar 400,000.00 m³
9 Kerikil sungai 500,000.00 m³
10 Batu teraso 13,600.00 kg
11 Batu granito 13,600.00 kg
12 Abu Batu 676,693.00 m³
13 Koral Sikat 75,000.00 Zak
14 Batu pecah mesin 2-3 cm 711,147.00 m³
15 Batu pecah mesin 3-5 cm 711,147.00 m³
16 Batu bata ukuran 8 x 8 x 16 cm 3,000.00 buah
17 Kayu Bangkirai : Balok 10/10 3,000,000.00 m³
18 Kayu Bangkirai : 5/7 & 4/6 3,000,000.00 m³
19 Kayu Bangkirai : 3/4 & 3/5 3,500,000.00 m³
20 Kayu Bangkirai : 2/3 3,500,000.00 m³
21 Papan bangkirai ( 2 x 20 x 400 ) 3,500,000.00 m³
22 Papan bangkirai ( 2 x 25 x 400 ) 3,500,000.00 m³
23 Papan bangkirai ( 2 x 30 x 400 ) 3,500,000.00 m³
24 Kayu Kruing : Balok 8/15 3,000,000.00 m³
25 Kayu Kruing : 5/7 & 4/6 3,000,000.00 m³
26 Kayu Kruing : 3/4 & 3/5 3,500,000.00 m³
27 Kayu Kruing : 2/3 3,500,000.00 m³
28 Kayu Kalimantan ( Meranti ) : Balok 10/10 2,500,000.00 m³
29 Kayu Kalimantan ( Meranti ) : Balok 8/15 2,500,000.00 m³
30 Kayu Kalimantan ( Meranti ) 5/7 & 4/6 2,500,000.00 m³
31 Kayu Kalimantan ( Meranti ) : 3/4 & 3/5 2,750,000.00 m³
32 Kayu Kalimantan ( Meranti ) : 2/3 2,750,000.00 m³
33 Papan Meranti ( 2 x 20 x 400 ) 2,750,000.00 m³
34 Papan Meranti ( 2 x 25 x 400 ) 2,750,000.00 m³
35 Kayu Ulin : 5/10 5,000,000.00 m³
36 kayu ulin : 10/10 5,000,000.00 m³
37 Papan Cetak ( kayu rawa ) uk 2 x 20 x 400 1,500,000.00 m³
38 Kayu perancah 4m 5,000.00 btg
39 Kayu perancah 1,650,000.00 m³
40 Dolken Ø 5 kayu rawa (merah) 17,600.00 btg
41 Dolken Ø 12 kayu rawa (merah) 33,000.00 btg
42 Ijuk 31,600.00 kg
43 Pintu Kayu panil ukuran 80 x 220 cm 732,050.00 buah
44 Hardpleks 0,35 mm 1,22 x 2,44 m, kalsiboard (tahan api) 474,362.00 lbr
45 Gipsum Board 424,000.00 lbr
45 Multipleks 9mm 280,000.00 lbr
46 List Kayu Profil 1/3 13,300.00 m'
47 List Kayu Profil 1/5 20,000.00 m'
48 List Kayu Profil 2/4 20,000.00 m'
49 List Gipsum 45,000.00 m'
49 Screw dia-6x20mm (truss screw) 450.00 buah
49 Screw dia-4x16mm (roof screw) 350.00 buah
49 Dynabolt Dia 12x120mm 1,500.00 buah
49 Sekrup Fixer 250.00 buah
50 Paku biasa 49,000.00 kg
51 Paku ulin 81,000.00 kg
HARGA SATUAN
NO HARGA BAHAN MATERIAL SATUAN
(RP)
52 Paku atap metal 300.00 Buah
53 Paku seng gelombang 49,922.00 kg
54 Baut Ø 1/2 - 45 cm 49,922.00 buah
55 Mur Baut Panjang 26,400.00 buah
56 Mur Baut Pendek 24,200.00 buah
57 Besi beton polos 27,900.59 kg
58 Besi beton ulir 27,900.59 kg
59 Besi beton U-24 44,900.59 kg
60 Besi beton U-39 44,900.59 kg
61 Besi Strip ( tebal 5 mm, lebar 5 cm ) 24,600.00 kg
67 Besi Strip 15,000.00 m'
68 Besi klam U 27,000.00 buah
77 Kunci tanam 265,000.00 buah
78 Kunci tanam kwalitas baik 211,750.00 buah
79 Kunci tanam biasa 105,000.00 buah
80 Grendel biasa 5,500.00 buah
81 Grendel kualitas baik 16,500.00 buah
81 Engsel Pintu Standart 80,000.00 Pasang
81 Engsel Pintu Kwalitas Baik 156,000.00 Pasang
81 Engsel Jendela Standart 55,000.00 Pasang
81 Engsel Jendela Kwalitas Baik 94,000.00 Pasang
82 Engsel Salon Veer East 9' SN ( Hak Angin) 35,000.00 buah
82 Hak Angin 8' Antique Kodai 25,000.00 buah
82 Kunci Tanam Cylinder 122,000.00 buah
82 Tarikan / Pegangan pintu kwalitas baik 330,000.00 buah
88 Kusen Almunium 4" Coklat 199,650.00 m'
89 Kusen Almunium 4" Putih 146,400.00 m'
114 Sealent 79,860.00 Kg
115 Profil Kaca 35,000.00 m'
116 Keramik polos kw. 1 ukuran 20 x 20 cm 97,500.00 m²
117 Keramik motif kw. 1 ukuran 20 x 20 cm 97,500.00 m²
118 Keramik polos kw.1 ukuran 30 x 30 cm 90,000.00 m²
119 Keramik motif kw.1 ukuran 30 x 30 cm 97,500.00 m²
120 Keramik motif granit kw.1 ukuran 30 x 30 cm 272,250.00 m²
121 Keramik polos kw.1 ukuran 40 x 40 cm 250,000.00 m²
122 Keramik motif kw.1 ukuran 40 x 40 cm 300,000.00 m²
123 Keramik motif granit kw.1 ukuran 40 x 40 cm 374,000.00 m²
124 Keramik Granit kw 1 uk. 60 x 60 cm 537,500.00 m²
125 Keramik motif kw.1 ukuran 60 x 60 cm 423,400.00 m²
126 Keramik motif granit ukuran 60 x 60 cm 465,850.00 m²
127 Keramik dinding polos kw.1 ukuran 20 x 25 cm 105,000.00 m²
128 Keramik dinding motif kw.1 uikuran 20 x 25 cm 105,000.00 m²
129 Keramik dinding polos kw 1 uk. 10 x 20 cm 85,250.00 m²
130 Keramik dinding polos kw 1 uk. 10 x 25 cm 90,750.00 m²
130 Ubin 30x30 cm 45,000.00 buah
130 Ubin Granito 40 x 40 cm 134,375.00 buah
131 Stepnozing anak tangga 38,500.00 m'
132 List keramik 27,500.00 m'
133 Keramik siku 25,000.00 m'
134 Granit Import 1,464,100.00 m²
135 Granito uk. 30 x 30 cm 43,900.00 buah
136 Granito uk. 40 x 40 cm 46,600.00 buah
137 Keramik Artistik 10/20 29,500.00 buah
138 Keramik Artistik 10/10 14,800.00 buah
139 Mozaik 60 x 60 cm 515,000.00 m²
140 Mozaik 20 x 20 cm 515,000.00 m²
141 Mozaik 30 x 30 cm 515,000.00 m²
HARGA SATUAN
NO HARGA BAHAN MATERIAL SATUAN
(RP)
158 Atap Genteng Metal Roof 126,000.00 lbr
159 Bubungan genteng metal roof 33,300.00 lbr
160 Talang U pvc 57,000.00 m
160 Aisan Talang PVC 2,500.00 bh
161 Fiberglass gelombang uk. 180 x 80 cm 119,800.00 lbr
162 Fiberglass plat lebar 100 cm m'
163 Bubungan metal 33,300.00 buah
164 A i r 150.00 liter
165 Minyak Bekisting ( olie bekas ) 10,600.00 liter
166 paku skrup 9,900.00 Kg
167 tinner 40,000.00 liter
168 Minyak pelumas 39,900.00 liter
169 Cat Warna ( Kayu/besi ) 5 kg 329,900.00 kaleng
170 Cat Warna ( Kayu/besi ). 47,300.00 kg
171 Cat dasar 18,000.00 Kg
172 Cat dasar ( meni kayu/besi ) 24,200.00 kg
173 Cat khusus atap 44,000.00 kg
174 Cat khusus atap 5 kg 220,000.00 kaleng
175 Vernis bening 41,800.00 ltr
176 Vernis warna 49,500.00 ltr
177 Politur 47,300.00 kg
178 Cat tembok eksterior 5 kg (kwalitas sedang) 329,928.00 kaleng
179 Cat tembok 65,985.60 kg
180 Cat tembok interior (kwalitas sedang) 65,985.60 kg
181 Cat tembok curah eksterior 14,300.00 kg
182 Cat tembok curah interior 5 kg 207,140.00 kaleng
183 Cat tembok curah interior 41,428.00 kg
184 Plamur/dempul
185 Plamur Kayu 5 kg 110,000.00 kaleng
186 Plamur Kayu 22,000.00 kg
187 Plamur Tembok 5 kg 41,800.00 kaleng
188 Plamur Tembok 8,360.00 kg
189 Flincote 33,000.00 kg
190 Amplas kayu/besi 5,000.00 lbr
191 Amplas kayu/besi 13,200.00 m
192 Lain-lain
228 Portland Cement ( PC ) 40 kg 697,000.00 zak
229 Portland Cement ( PC ) 50 kg 871,250.00 zak
230 Portland Cement ( PC ) 17,425.00 kg
231 Cement warna 16,500.00 kg
270 Pipa PVC 1/2 AW 20,000.00 m1
271 Pipa PVC 3/4 AW 24,000.00 m1
272 Pipa PVC 1 AW 33,300.00 m1
273 Pipa PVC 1 1/2 AW 61,200.00 m1
274 Pipa PVC 2 AW 79,900.00 m1
275 Pipa PVC 2 1/2 AW 114,500.00 m1
276 Pipa PVC 3 AW 139,800.00 m1
277 Pipa PVC 4 AW 217,000.00 m1
277 T dos 3 way 9,000.00 Buah
277 T dos 4 way 10,000.00 Buah
277 Sock/Klem pipa 1,500.00 Buah
277 L bow 12,000.00 Buah
ANALISA HARGA SATUAN PEKERJAAN

JUMLAH
NO KOEF SAT HARGA SAT (Rp)
(Rp)
1 2 3 4 5 6=(3x5)
A. PEKERJAAN PERSIAPAN SNI 03-2835-2002
A.006 Membuat 1 m² gudang semen dan alat-alat
Bahan
UB.041 Dolken Ø 12 kayu rawa (merah) 1.7000 Btg 33,000.00 56,100.00
UB.030 Kayu Kalimantan ( Meranti ) 5/7 & 4/6 0.2100 m³ 2,500,000.00 525,000.00
UB.050 Paku biasa 0.3000 kg 49,000.00 14,700.00
UB.230 Portland Cement ( PC ) 10.5000 kg 17,425.00 182,962.50
UB.005 Pasir pasang / Pasir Beton 0.0300 m³ 500,000.00 15,000.00
UB.009 Kerikil sungai 0.0500 m³ 500,000.00 25,000.00
UB.156 Seng Gelombang BJLS 30 lebar 90 cm ; panjang 180 1.5000 lbr 110,000.00 165,000.00
Jumlah (1) 983,762.50
Tenaga
UB.004 Pekerja 1.0000 OH 125,500.00 125,500.00
UB.001 Tukang kayu 2.0000 OH 134,000.00 268,000.00
UB.002 Kepala tukang kayu 0.2000 OH 150,000.00 30,000.00
UB.003 Mandor 0.0500 OH 165,000.00 8,250.00
Jumlah (2) 431,750.00
Jumlah (1) + (2) 1,415,512.50
A.011 Membongkar 1 m³ beton bertulang
UB.004 Pekerja 6.6670 OH 125,500.00 836,708.50
UB.003 Mandor 0.3330 OH 165,000.00 54,945.00
Jumlah 891,653.50
A.012 Membongkar 1 m³ dinding tembok bata merah
UB.004 Pekerja 6.6670 OH 125,500.00 836,708.50
UB.003 Mandor 0.0330 OH 165,000.00 5,445.00
Jumlah 842,153.50
A.018 Membongkar 1 m² genteng/ sirap (bongkaran tidak dipakai kembali)
UB.004 Pekerja 0.1000 OH 125,500.00 12,550.00
UB.003 Mandor 0.0100 OH 165,000.00 1,650.00
Jumlah 14,200.00
A.020 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali)
UB.004 Pekerja 0.1500 OH 125,500.00 18,825.00
UB.001 Tukang kayu 0.0750 OH 134,000.00 10,050.00
UB.002 Kepala tukang kayu 0.0075 OH 150,000.00 1,125.00
UB.003 Mandor 0.0150 OH 165,000.00 2,475.00
Jumlah 32,475.00
A.024 Membongkar 1 m² plafond (bongkaran tidak dipakai kembali)
UB.004 Pekerja 0.1500 OH 125,500.00 18,825.00
UB.003 Mandor 0.0150 OH 165,000.00 2,475.00
Jumlah 21,300.00

B. PEKERJAAN TANAH SNI


B.012 Mengurug 1 m³ pasir urug
Bahan
UB.003 Pasir urug 1.2000 m³ 450,000.00 540,000.00
Jumlah (1) 540,000.00
Tenaga
UB.004 Pekerja 0.3000 OH 125,500.00 37,650.00
UB.003 Mandor 0.0100 OH 165,000.00 1,650.00
Jumlah (2) 39,300.00
Jumlah (1) + (2) 579,300.00
C. PEKERJAAN PONDASI SNI 03-2836-2002
D. PEKERJAAN DINDING SNI 03-2837-2002
D.009 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal ½ bata; campuran 1 PC : 3 PP
Bahan
UB.016 Batu bata ukuran 8 x 8 x 16 cm 60.0000 buah 3,000.00 180,000.00
UB.230 Portland Cement ( PC ) 14.3700 kg 17,425.00 250,397.25
UB.005 Pasir pasang / Pasir Beton 0.0400 m³ 500,000.00 20,000.00
Jumlah (1) 450,397.25
Tenaga
UB.004 Pekerja 0.3000 OH 125,500.00 37,650.00
UB.001 Tukang batu 0.1000 OH 134,000.00 13,400.00
UB.002 Kepala tukang batu 0.0100 OH 150,000.00 1,500.00
UB.003 Mandor 0.0150 OH 165,000.00 2,475.00
Jumlah (2) 55,025.00
JUMLAH
NO KOEF SAT HARGA SAT (Rp)
(Rp)
1 2 3 4 5 6=(3x5)
Jumlah (1) + (2) 505,422.25
E. PEKERJAAN PLESTERAN SNI 03-2837-2002
E.010 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 20 mm
Bahan
UB.230 Portland Cement ( PC ) 10.3680 kg 17,425.00 180,662.40
UB.005 Pasir pasang / Pasir Beton 0.0310 m³ 500,000.00 15,500.00
Jumlah (1) 196,162.40
Tenaga
UB.004 Pekerja 0.2600 OH 125,500.00 32,630.00
UB.001 Tukang batu 0.2000 OH 134,000.00 26,800.00
UB.002 Kepala tukang batu 0.0200 OH 150,000.00 3,000.00
UB.003 Mandor 0.0220 OH 165,000.00 3,630.00
Jumlah (2) 66,060.00
Jumlah (1) + (2) 262,222.40
E.031 Memasang 1 m² acian
Bahan
UB.230 Portland Cement ( PC ) 3.2500 kg 17,425.00 56,631.25
Jumlah (1) 56,631.25
Tenaga
UB.004 Pekerja 0.1500 OH 125,500.00 18,825.00
UB.001 Tukang batu 0.1000 OH 134,000.00 13,400.00
UB.002 Kepala tukang batu 0.0100 OH 150,000.00 1,500.00
UB.003 Mandor 0.0100 OH 165,000.00 1,650.00
Jumlah (2) 35,375.00
Jumlah (1) + (2) 92,006.25
F. PEKERJAAN KAYU SNI 03-3434-2002
F.021 Membuat dan memasang 1 m³ konstruksi gording; Kayu Kapur/ Lembasung
Bahan
UB.024 Kayu Kruing : Balok 8/15 1.1000 m³ 3,000,000.00 3,300,000.00
UB.061 Besi Strip ( tebal 5 mm, lebar 5 cm ) 15.0000 kg 24,600.00 369,000.00
UB.050 Paku biasa 3.0000 kg 49,000.00 147,000.00
Jumlah (1) 3,816,000.00
Tenaga
UB.004 Pekerja 2.4000 OH 125,500.00 301,200.00
UB.001 Tukang kayu 7.2000 OH 134,000.00 964,800.00
UB.002 Kepala tukang kayu 0.7200 OH 150,000.00 108,000.00
UB.003 Mandor 0.1200 OH 165,000.00 19,800.00
Jumlah (2) 1,393,800.00
Jumlah (1) + (2) 5,209,800.00
F.028 Membuat dan memasang 1 m² rangka atap genteng beton; Kayu Meranti
Bahan
UB.026 Kayu Kruing : 3/4 & 3/5 0.0140 m³ 3,500,000.00 49,000.00
UB.025 Kayu Kruing : 5/7 & 4/6 0.0570 m³ 3,000,000.00 171,000.00
UB.050 Paku biasa 0.2500 kg 49,000.00 12,250.00
Jumlah (1) 232,250.00
Tenaga
UB.004 Pekerja 0.1000 OH 125,500.00 12,550.00
UB.001 Tukang kayu 0.1000 OH 134,000.00 13,400.00
UB.002 Kepala tukang kayu 0.0100 OH 150,000.00 1,500.00
UB.003 Mandor 0.0050 OH 165,000.00 825.00
Jumlah (2) 28,275.00
Jumlah (1) + (2) 260,525.00
F.030 Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Meranti
Bahan
UB.025 Kayu Kruing : 5/7 & 4/6 0.0140 m³ 3,000,000.00 42,000.00
UB.026 Kayu Kruing : 3/4 & 3/5 0.0570 3,500,000.00 199,500.00
UB.050 Paku biasa 0.2500 kg 49,000.00 12,250.00
Jumlah (1) 253,750.00
Tenaga
UB.004 Pekerja 0.1000 OH 125,500.00 12,550.00
UB.001 Tukang kayu 0.1000 OH 134,000.00 13,400.00
UB.002 Kepala tukang kayu 0.0100 OH 150,000.00 1,500.00
UB.003 Mandor 0.0050 OH 165,000.00 825.00
Jumlah (2) 28,275.00
Jumlah (1) + (2) 282,025.00

F.038 Memasang 1 m' lisplank uk. (2 x 20cm)


Bahan
JUMLAH
NO KOEF SAT HARGA SAT (Rp)
(Rp)
1 2 3 4 5 6=(3x5)
UB.021 Papan bangkirai ( 2 x 20 x 400 ) 0.0097 m³ 3,500,000.00 33,950.00
UB.050 Paku biasa 0.0600 kg 49,000.00 2,940.00
Jumlah (1) 36,890.00
Tenaga
UB.004 Pekerja 0.1000 Oh 125,500.00 12,550.00
UB.001 Tukang kayu 0.1000 Oh 134,000.00 13,400.00
UB.002 Kepala tukang kayu 0.0100 Oh 150,000.00 1,500.00
UB.003 Mandor 0.0500 Oh 165,000.00 8,250.00
Jumlah (2) 35,700.00
Jumlah (1) + (2) 72,590.00
G. PEKERJAAN BETON RSNI-T-13-2002
G.001 Membuat 1 m³ beton tumbuk 1 PC : 3 PB : 5 KR, Batu Pecah
Bahan
UB.230 Portland Cement ( PC ) 218.0000 kg 17,425.00 3,798,650.00
UB.005 Pasir pasang / Pasir Beton 0.5200 m³ 500,000.00 260,000.00
UB.014 Batu pecah mesin 2-3 cm 0.8700 m³ 711,147.00 618,697.89
Jumlah (1) 4,677,347.89
Tenaga
UB.004 Pekerja 1.6500 OH 125,500.00 207,075.00
UB.001 Tukang batu 0.2500 OH 134,000.00 33,500.00
UB.002 Kepala tukang batu 0.0250 OH 150,000.00 3,750.00
UB.003 Mandor 0.0800 OH 165,000.00 13,200.00
Jumlah (2) 257,525.00
Jumlah (1) + (2) 4,934,872.89
G.007 Membuat 1 m³ beton bertulang 1 PC : 2 PB : 3 KR, Batu Pecah
Bahan
UB.230 Portland Cement ( PC ) 336.0000 kg 17,425.00 5,854,800.00
UB.005 Pasir pasang / Pasir Beton 0.5400 m³ 500,000.00 270,000.00
UB.009 Kerikil sungai 0.7800 m³ 500,000.00 390,000.00
Jumlah (1) 6,514,800.00
Tenaga
UB.004 Pekerja 1.6500 OH 125,500.00 207,075.00
UB.001 Tukang batu 0.2500 OH 134,000.00 33,500.00
UB.002 Kepala tukang batu 0.0250 OH 150,000.00 3,750.00
UB.003 Mandor 0.0800 OH 165,000.00 13,200.00
Jumlah (2) 257,525.00
Jumlah (1) + (2) 6,772,325.00
G.026 Pembesian 1 kg dengan besi polos atau besi ulir
Bahan
UB.057 Besi beton polos 1.0500 kg 27,900.59 29,295.62
UB.076 Kawat beton (bindrad) 0.0150 kg 52,400.00 786.00
Jumlah (1) 30,081.62
Tenaga
UB.004 Pekerja 0.0070 OH 125,500.00 878.50
UB.001 Tukang batu 0.0070 OH 134,000.00 938.00
UB.002 Kepala tukang besi 0.0007 OH 150,000.00 105.00
UB.003 Mandor 0.0004 OH 165,000.00 66.00
Jumlah (2) 1,987.50
Jumlah (1) + (2) 32,069.12
G.030 Memasang 1 m² bekisting untuk sloof
Bahan
UB.030 Kayu Kalimantan ( Meranti ) 5/7 & 4/6 0.0450 m³ 2,500,000.00 112,500.00
UB.037 Papan Cetak ( kayu rawa ) uk 2 x 20 x 400 0.0200 m³ 1,500,000.00 30,000.00
UB.165 Minyak Bekisting ( olie bekas ) 0.1000 liter 10,600.00 1,060.00
UB.050 Paku biasa 0.4000 Kg 49,000.00 19,600.00
Jumlah (1) 143,560.00
Tenaga
UB.004 Pekerja 0.5200 OH 125,500.00 65,260.00
UB.001 Tukang kayu 0.2600 OH 134,000.00 34,840.00
UB.002 Kepala tukang kayu 0.0260 OH 150,000.00 3,900.00
UB.003 Mandor 0.0260 OH 165,000.00 4,290.00
Jumlah (2) 108,290.00
Jumlah (1) + (2) 251,850.00
G.031 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting sloof 21,658.00

G.032 Memasang 1 m² bekisting untuk kolom


Bahan
JUMLAH
NO KOEF SAT HARGA SAT (Rp)
(Rp)
1 2 3 4 5 6=(3x5)
UB.030 Kayu Kalimantan ( Meranti ) 5/7 & 4/6 0.0400 m³ 2,500,000.00 100,000.00
UB.050 Paku biasa 0.4000 kg 49,000.00 19,600.00
UB.165 Minyak Bekisting ( olie bekas ) 0.2000 liter 10,600.00 2,120.00
UB.037 Papan Cetak ( kayu rawa ) uk 2 x 20 x 400 0.0200 m3 1,500,000.00 30,000.00
UB.038 Kayu perancah 4m 4.0000 Btg 5,000.00 20,000.00
Jumlah (1) 171,720.00
Tenaga
UB.004 Pekerja 0.6600 OH 125,500.00 82,830.00
UB.001 Tukang kayu 0.3300 OH 134,000.00 44,220.00
UB.002 Kepala tukang kayu 0.0330 OH 150,000.00 4,950.00
UB.003 Mandor 0.0330 OH 165,000.00 5,445.00
Jumlah (2) 137,445.00
Jumlah (1) + (2) 309,165.00
G.033 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting kolom 27,489.00

G.034 Memasang 1 m² bekisting untuk balok


Bahan
UB.030 Kayu Kalimantan ( Meranti ) 5/7 & 4/6 0.0400 m³ 2,500,000.00 100,000.00
UB.050 Paku biasa 0.4000 kg 49,000.00 19,600.00
UB.165 Minyak Bekisting ( olie bekas ) 0.2000 liter 10,600.00 2,120.00
UB.037 Papan Cetak ( kayu rawa ) uk 2 x 20 x 400 0.0200 m3 1,500,000.00 30,000.00
UB.038 Kayu perancah 4m 6.0000 Btg 5,000.00 30,000.00
Jumlah (1) 181,720.00
Tenaga
UB.004 Pekerja 0.6600 OH 125,500.00 82,830.00
UB.001 Tukang kayu 0.3300 OH 134,000.00 44,220.00
UB.002 Kepala tukang kayu 0.0330 OH 150,000.00 4,950.00
UB.003 Mandor 0.0330 OH 165,000.00 5,445.00
Jumlah (2) 137,445.00
Jumlah (1) + (2) 319,165.00
G.035 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting balok 27,489.00
H. PEKERJAAN PENUTUP ATAP SNI 03-3436-2002
H.013 Menutup Atap dengan genteng Metal sakura roof per m2
Bahan
UB.158 Atap Genteng Metal Roof 1.6234 lbr 126,000.00 204,548.40
UB.052 Paku atap metal 12.0000 Bh 300.00 3,600.00
Jumlah (1) 208,148.40
Tenaga
UB.004 Pekerja 0.2000 OH 125,500.00 25,100.00
UB.001 Tukang kayu 0.1000 OH 134,000.00 13,400.00
UB.002 Kepala tukang kayu 0.0100 OH 150,000.00 1,500.00
UB.003 Mandor 0.0100 OH 165,000.00 1,650.00
Jumlah (2) 41,650.00
Jumlah (1) + (2) 249,798.40
H.014 Menutup bubungan pada genteng metal Sakura roof per m'
Bahan
UB.159 Bubungan genteng metal roof 2.5000 Bh 33,300.00 83,250.00
UB.052 Paku atap metal 10.0000 Bh 300.00 3,000.00
Jumlah (1) 86,250.00
Tenaga
UB.004 Pekerja 0.2000 OH 125,500.00 25,100.00
UB.001 Tukang kayu 0.1000 OH 134,000.00 13,400.00
UB.002 Kepala tukang kayu 0.0100 OH 150,000.00 1,500.00
UB.003 Mandor 0.0100 OH 165,000.00 1,650.00
Jumlah (2) 41,650.00
Jumlah (1) + (2) 127,900.00
I. PEKERJAAN LANGIT-LANGIT SNI 03-2838-2002
I.011 Memasang 1 m² langit-langit gipsumboard uk. (120 x 240) cm, tebal 9 mm
Bahan
UB.045 Gipsum Board 0.3640 lembar 424,000.00 154,336.00
UB.166 paku skrup 0.1100 kg 9,900.00 1,089.00
Jumlah (1) 155,425.00
Tenaga
UB.004 Pekerja 0.1000 OH 125,500.00 12,550.00
UB.001 Tukang kayu 0.0500 OH 134,000.00 6,700.00
UB.002 Kepala tukang kayu 0.0050 OH 150,000.00 750.00
UB.003 Mandor 0.0050 OH 165,000.00 825.00
Jumlah (2) 20,825.00
JUMLAH
NO KOEF SAT HARGA SAT (Rp)
(Rp)
1 2 3 4 5 6=(3x5)
Jumlah (1) + (2) 176,250.00
I.012 Memasang 1 m' list gipsum
Bahan
UB.049 List Gipsum 1.0500 m' 45,000.00 47,250.00
UB.166 paku skrup 0.1500 kg 9,900.00 1,485.00
Jumlah (1) 48,735.00
Tenaga
UB.004 Pekerja 0.0600 OH 125,500.00 7,530.00
UB.001 Tukang kayu 0.0600 OH 134,000.00 8,040.00
UB.002 Kepala tukang kayu 0.0060 OH 150,000.00 900.00
UB.003 Mandor 0.0030 OH 165,000.00 495.00
Jumlah (2) 16,965.00
Jumlah (1) + (2) 65,700.00
J. PEKERJAAN SANITASI SNI
J.013 Memasang 1 m' pipa PVC tipe AW Ø ½"
Bahan
UB.270 Pipa PVC 1/2 AW 1.2000 m' 20,000.00 24,000.00
Accesorries 35% harga pipa 7,000.00 7,000.00
Jumlah (1) 31,000.00
Tenaga
UB.004 Pekerja 0.0360 OH 125,500.00 4,518.00
UB.001 Tukang batu 0.0600 OH 134,000.00 8,040.00
UB.002 Kepala tukang batu 0.0060 OH 150,000.00 900.00
UB.003 Mandor 0.0018 OH 165,000.00 297.00
Jumlah (2) 13,755.00
Jumlah (1) + (2) 44,755.00
J.017 Memasang 1 m' pipa PVC tipe AW Ø 2"
Bahan
UB.274 Pipa PVC 2 AW 1.2000 m' 79,900.00 95,880.00
Accesorries 35% harga pipa 27,965.00 27,965.00
Jumlah (1) 123,845.00
Tenaga
UB.004 Pekerja 0.0540 OH 125,500.00 6,777.00
UB.001 Tukang batu 0.0900 OH 134,000.00 12,060.00
UB.002 Kepala tukang batu 0.0090 OH 150,000.00 1,350.00
UB.003 Mandor 0.0027 OH 165,000.00 445.50
Jumlah (2) 20,632.50
Jumlah (1) + (2) 144,477.50
J.022 Memasang 1 buah kran Ø ¾" atau ½" Biasa
Bahan
UB.258 Kran air plastik 1.0000 bh 15,000.00 15,000.00
UB.260 Seal Tape 0.0250 bh 5,000.00 125.00
Jumlah (1) 15,125.00

Tenaga
UB.004 Pekerja 0.0100 OH 125,500.00 1,255.00
UB.001 Tukang batu 0.1000 OH 134,000.00 13,400.00
UB.002 Kepala tukang batu 0.0100 OH 150,000.00 1,500.00
UB.003 Mandor 0.0050 OH 165,000.00 825.00
Jumlah (2) 16,980.00
Jumlah (1) + (2) 32,105.00
K. PEKERJAAN BESI DAN ALUMUNIUM Revisi SNI T-16-2002
K.009 Memasang 1 m' Kusen Alumunium 4 "
Bahan
UB.088 Kusen Almunium 4" Coklat 1.1000 m' 199,650.00 219,615.00
UB.049 Sekrup Fixer 4.0000 Bh 250.00 1,000.00
UB.114 Sealent 0.0600 Tube 79,860.00 4,791.60
Jumlah (1) 225,406.60
Tenaga
UB.004 Pekerja 0.0430 OH 125,500.00 5,396.50
UB.001 Tukang besi 0.0430 OH 134,000.00 5,762.00
UB.002 Kepala tukang besi 0.0043 OH 150,000.00 645.00
UB.003 Mandor 0.0021 OH 165,000.00 346.50
Jumlah (2) 12,150.00
Jumlah (1) + (2) 237,556.60
K.011 1 M2 Daun Jendela Kaca Rangka Alumunium SNI DT 90-0014-2007
Bahan
JUMLAH
NO KOEF SAT HARGA SAT (Rp)
(Rp)
1 2 3 4 5 6=(3x5)
UB.088 Kusen Almunium 4" Coklat 3.4125 m' 199,650.00 681,305.63
UB.115 Profil Kaca 3.4125 m' 35,000.00 119,437.50
UB.114 Sealent 0.2700 Tube 79,860.00 21,562.20
Jumlah (1) 822,305.33
Tenaga
UB.004 Pekerja 0.0850 OH 125,500.00 10,667.50
UB.001 Tukang besi 0.0850 OH 134,000.00 11,390.00
UB.002 Kepala tukang besi 0.0090 OH 150,000.00 1,350.00
UB.003 Mandor 0.0050 OH 165,000.00 825.00
Jumlah (2) 24,232.50
Jumlah (1) + (2) 846,537.83
L. PEKERJAAN KUNCI DAN KACA
L.001 Memasang 1 buah kunci tanam kwalitas baik
Bahan
UB.077 Kunci tanam 1.0000 bh 265,000.00 265,000.00
Jumlah (1) 265,000.00
Tenaga
UB.004 Pekerja 0.0600 OH 125,500.00 7,530.00
UB.001 Tukang kayu 0.6000 OH 134,000.00 80,400.00
UB.002 Kepala tukang kayu 0.0600 OH 150,000.00 9,000.00
UB.003 Mandor 0.0030 OH 165,000.00 495.00
Jumlah (2) 97,425.00
Jumlah (1) + (2) 362,425.00
L.005 Memasang engsel pintu
Bahan
UB.081 Engsel Pintu Standart 1.5000 Psg 80,000.00 120,000.00
Jumlah (1) 120,000.00
Tenaga
UB.004 Pekerja 0.0150 OH 125,500.00 1,882.50
UB.001 Tukang kayu 0.1500 OH 134,000.00 20,100.00
UB.002 Kepala tukang kayu 0.0150 OH 150,000.00 2,250.00
UB.003 Mandor 0.0008 OH 165,000.00 123.75
Jumlah (2) 24,356.25
Jumlah (1) + (2) 144,356.25
M. PEKERJAAN PENUTUP LANTAI DAN DINDING SNI-Pt-T2000-C
M.001 Memasang 1 m² lantai keramik ukuran 60 x 60 cm
Bahan
UB.124 Keramik Granit kw 1 uk. 60 x 60 cm 1.0000 m² 537,500.00 537,500.00
UB.230 Portland Cement ( PC ) 9.6000 kg 17,425.00 167,280.00
UB.005 Pasir pasang / Pasir Beton 0.0450 m³ 500,000.00 22,500.00
UB.231 Cement warna 1.3000 kg 16,500.00 21,450.00
Jumlah (1) 748,730.00
Tenaga
UB.004 Pekerja 0.7000 OH 125,500.00 87,850.00
UB.001 Tukang batu 0.3500 OH 134,000.00 46,900.00
UB.002 Kepala tukang batu 0.0350 OH 150,000.00 5,250.00
UB.003 Mandor 0.0300 OH 165,000.00 4,950.00
Jumlah (2) 144,950.00
Jumlah (1) + (2) 893,680.00
JUMLAH
NO KOEF SAT HARGA SAT (Rp)
(Rp)
1 2 3 4 5 6=(3x5)

M.004 Pasang lantai keramik 20 x 20 cm per 1 M2


Bahan
UB.116 Keramik polos kw. 1 ukuran 20 x 20 cm 1.0000 m² 97,500.00 97,500.00
UB.230 Portland Cement ( PC ) 10.4000 kg 17,425.00 181,220.00
UB.005 Pasir pasang / Pasir Beton 0.0420 m³ 500,000.00 21,000.00
UB.231 Cement warna 1.5000 kg 16,500.00 24,750.00
Jumlah (1) 324,470.00
Tenaga
UB.004 Pekerja 0.7000 OH 125,500.00 87,850.00
UB.001 Tukang batu 0.3500 OH 134,000.00 46,900.00
UB.002 Kepala tukang batu 0.0350 OH 150,000.00 5,250.00
UB.003 Mandor 0.0300 OH 165,000.00 4,950.00
Jumlah (2) 144,950.00
Jumlah (1) + (2) 469,420.00
M.006 Memasang 1 m² dinding keramik ukuran 20 x 25 cm
Bahan
UB.127 Keramik dinding polos kw.1 ukuran 20 x 25 cm 1.0000 m² 105,000.00 105,000.00
UB.230 Portland Cement ( PC ) 9.3000 kg 17,425.00 162,052.50
UB.005 Pasir pasang / Pasir Beton 0.0180 m³ 500,000.00 9,000.00
UB.231 Cement warna 1.9400 kg 16,500.00 32,010.00
Jumlah (1) 308,062.50
Tenaga
UB.004 Pekerja 0.9000 OH 125,500.00 112,950.00
UB.001 Tukang batu 0.4500 OH 134,000.00 60,300.00
UB.002 Kepala tukang batu 0.0450 OH 150,000.00 6,750.00
UB.003 Mandor 0.0450 OH 165,000.00 7,425.00
Jumlah (2) 187,425.00
Jumlah (1) + (2) 495,487.50
M.008 Memasang 1 m' plint keramik ukuran 10 x 20 cm
Bahan
UB.129 Keramik dinding polos kw 1 uk. 10 x 20 cm 1.0000 m1 85,250.00 85,250.00
UB.230 Portland Cement ( PC ) 1.1400 kg 17,425.00 19,864.50
UB.005 Pasir pasang / Pasir Beton 0.0030 m³ 500,000.00 1,500.00
UB.231 Cement warna 0.0250 kg 16,500.00 412.50
Jumlah (1) 107,027.00
Tenaga
UB.004 Pekerja 0.0900 OH 125,500.00 11,295.00
UB.001 Tukang batu 0.0900 OH 134,000.00 12,060.00
UB.002 Kepala tukang batu 0.0090 OH 150,000.00 1,350.00
UB.003 Mandor 0.0050 OH 165,000.00 825.00
Jumlah (2) 25,530.00
Jumlah (1) + (2) 132,557.00
Jumlah (1) + (2) 773,490.00
M.012 Memasang 1 m² dinding batu alam
Bahan
UB.207 Batu Paras 1.1000 m² 223,850.00 246,235.00
UB.230 Portland Cement ( PC ) 11.7500 kg 17,425.00 204,743.75
UB.231 Cement warna 0.0350 m³ 16,500.00 577.50
Jumlah (1) 451,556.25
Tenaga
UB.004 Pekerja 0.7000 OH 125,500.00 87,850.00
UB.001 Tukang batu 0.3500 OH 134,000.00 46,900.00
UB.002 Kepala tukang batu 0.0350 OH 150,000.00 5,250.00
UB.003 Mandor 0.0350 OH 165,000.00 5,775.00
Jumlah (2) 145,775.00
Jumlah (1) + (2) 597,331.25
N. PEKERJAAN PENGECATAN SNI
N.002 Mencuci bidang permukaan tembok yang pernah di cat per 1 M2
Bahan
UB.205 Sabun 0.0500 kg 20,000.00 1,000.00
Jumlah (1) 1,000.00
Tenaga
UB.004 Pekerja 0.1500 OH 125,500.00 18,825.00
UB.003 Mandor 0.0025 OH 165,000.00 412.50
Jumlah (2) 19,237.50
JUMLAH
NO KOEF SAT HARGA SAT (Rp)
(Rp)
1 2 3 4 5 6=(3x5)
Jumlah (1) + (2) 20,237.50
N.012 Mengecat 1 m² 1 lps plamir, 1 lps cat dsr, 2 lps cat penutup
Bahan
UB.188 Plamur Tembok 0.1000 kg 8,360.00 836.00
UB.171 Cat dasar 0.1000 kg 18,000.00 1,800.00
UB.179 Cat tembok 0.2600 kg 65,985.60 17,156.26
Jumlah (1) 19,792.26
Tenaga
UB.004 Pekerja 0.0200 OH 125,500.00 2,510.00
UB.002 Tukang cat 0.0630 OH 134,000.00 8,442.00
UB.003 Kepala tukang cat 0.0063 OH 150,000.00 945.00
UB.003 Mandor 0.0025 OH 165,000.00 412.50
Jumlah (2) 12,309.50
Jumlah (1) + (2) 32,101.76
REKAPITULASI ANGGARAN BIAYA

Pekerjaan : Renovasi Rumah Dinas Paramedis Long Nawang


Lokasi : Long Nawang
Tahun Anggaran : 2019

NO JENIS PEKERJAAN JUMLAH HARGA


(Rp.)

Rp 72,632,733.78
1 PEKERJAAN PERSIAPAN
Rp 81,528,770.14
2 PEKERJAAN STRUKTUR BANGUNAN
Rp 405,243,295.74
3 PEKERJAAN LANTAI DAN DINDING
Rp 164,683,603.37
4 PEKERJAAN PLAFOND DAN ATAP
Rp 4,498,790.00
5 PEKERJAAN AIR BERSIH DAN AIR KOTOR
Rp 50,683,526.78
6 PEKERJAAN KUSEN DAN PINTU
Rp 16,638,371.11
7 PEKERJAAN LAIN - LAIN

JUMLAH TOTAL SELURUH PEKERJAAN Rp 795,909,090.91


PAJAK PERTAMBAHAN NILAI (PPn) 10 % Rp 79,590,909.09
JUMLAH TOTAL + PPn 10 % Rp 875,500,000.00
DIBULATKAN Rp 875,500,000.00
TERBILANG : Delapan Ratus Tujuh Puluh Lima Juta Lima Ratus Ribu Rupiah

Tanjung Selor, 01 Juli 2019


CV. NAWANG

HEBER NEGO
Direktur
RENCANA ANGGARAN BIAYA

Pekerjaan : Renovasi Rumah Dinas Paramedis Long Nawang


Lokasi : Long Nawang
Tahun Anggaran : 2019

HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN

1 Papan nama proyek Ls 1.00 Rp 650,582.92 Rp 650,582.92


2 Pembuatan direksi keet dan gudang M 2 36.00 Rp 1,415,512.50 Rp 50,958,450.00
3 Membongkar Atap Lama M2 151.23 Rp 14,200.00 Rp 2,147,421.27
4 Membongkar Rangka Atap M2 151.23 Rp 32,475.00 Rp 4,911,091.95
5 Membongkar kuda - kuda dan gording M3 1.98 Rp 938,000.00 Rp 1,854,572.33
6 Membongkar Plafond M 2 143.00 Rp 21,300.00 Rp 3,045,900.00
7 Membongkar dinding bata M3 3.70 Rp 842,153.50 Rp 3,112,599.34
8 Membongkar Sloof M3 0.65 Rp 891,653.50 Rp 577,791.47
9 Membongkar lantai bangunan M2 96.00 Rp 17,750.00 Rp 1,704,000.00
10 Membongkar dinding partisi M2 113.02 Rp 32,475.00 Rp 3,670,324.50
TOTAL HARGA PEKERJAAN PERSIAPAN Rp 72,632,733.78
II PEKERJAAN STRUKTUR BANGUNAN

1 Sloof 20cm/25cm
- Beton sloof M3 1.80 Rp 6,772,325.00 Rp 12,190,185.00
- Pembesian besi 12mm Kg 192.24 Rp 32,069.12 Rp 6,164,967.53
- Pembesian besi 8mm Kg 101.03 Rp 32,069.12 Rp 3,239,789.21
- Pasang Bekisting M2 9.00 Rp 251,850.00 Rp 2,266,650.00
- Bongkar Bekisting M2 9.00 Rp 21,658.00 Rp 194,922.00
2 Kolom Praktis 12cm/12cm
- Beton Kolom M3 1.03 Rp 6,772,325.00 Rp 6,948,405.45
- Pembesian besi 12mm Kg 294.23 Rp 32,069.12 Rp 9,435,825.31
- Pembesian besi 8mm Kg 127.59 Rp 32,069.12 Rp 4,091,538.61
- Pasang Bekisting M2 9.92 Rp 309,165.00 Rp 3,066,298.47
- Bongkar Bekisting M 2 9.92 Rp 27,489.00 Rp 272,635.90
3 Ring Balok 15cm/25cm
- Beton Balok M3 1.35 Rp 6,772,325.00 Rp 9,142,638.75
- Pembesian besi 12mm Kg 192.24 Rp 32,069.12 Rp 6,164,967.53
- Pembesian besi 8mm Kg 90.04 Rp 32,069.12 Rp 2,887,638.21
- Pasang Bekisting M2 7.20 Rp 319,165.00 Rp 2,297,988.00
- Bongkar Bekisting M 2 7.20 Rp 27,489.00 Rp 197,920.80
4 Balok Latei 12cm/15cm
- Beton Balok M3 0.65 Rp 6,772,325.00 Rp 4,388,466.60
- Pembesian besi 12mm Kg 128.16 Rp 32,069.12 Rp 4,109,978.36
- Pembesian besi 8mm Kg 61.49 Rp 32,069.12 Rp 1,972,045.61
- Pasang Bekisting M2 7.20Rp 319,165.00 Rp 2,297,988.00
- Bongkar Bekisting M2 7.20 Rp 27,489.00 Rp 197,920.80
TOTAL HARGA PEKERJAAN STRUKTUR BANGUNAN Rp 81,528,770.14
HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5 6
III PEKERJAAN LANTAI DAN DINDING

1 Lantai Bangunan
- Urugan Pasir Bawah lantai M3 14.30 Rp 579,300.00 Rp 8,283,990.00
- Rabat beton lantai M3 14.30 Rp 4,934,872.89 Rp 70,568,682.33
- Lantai Keramik 60cm/60cm M2 138.50 Rp 893,680.00 Rp 123,774,680.00
- Lantai Keramik 20cm/20cm M 2 4.50 Rp 469,420.00 Rp 2,112,390.00
2 Dinding Bangunan
- Pasangan bata M2 129.04 Rp 505,422.25 Rp 65,219,687.14
- Pasangan batu alam M 2 28.16 Rp 597,331.25 Rp 16,820,848.00
- Plesteran dinding bata M2 258.08 Rp 262,222.40 Rp 67,674,356.99
- Acian dinding M 2 229.92 Rp 92,006.25 Rp 21,154,077.00
- Cat dinding M2 229.92 Rp 32,101.76 Rp 7,380,835.74
- Cat dinding lama M2 277.50 Rp 32,101.76 Rp 8,908,237.29
- Membersihkan cat tembok lama M2 277.50 Rp 20,237.50 Rp 5,615,906.25
- Keramik dinding KM/WC 20cm/25cm M 2 15.60 Rp 495,487.50 Rp 7,729,605.00
TOTAL HARGA PEKERJAAN LANTAI DAN DINDING Rp 405,243,295.74
IV PEKERJAAN PLAFOND DAN ATAP
1 Plafond Bangunan
- Pekerjaan rangka plafond M2 143.00 Rp 124,200.00 Rp 17,760,600.00
- Pekerjaan penutup plafond Gipsum M2 143.00 Rp 176,250.00 Rp 25,203,750.00
- List Gipsum M 1 153.00 Rp 65,700.00 Rp 10,052,100.00
- Pekerjaan pengecatan plafond M2 143.00 Rp 32,101.76 Rp 4,590,551.11
2 Kuda - Kuda Bangunan M3 1.04 Rp 6,266,400.00 Rp 6,498,808.24
3 Gording 5/10 M3 0.96 Rp 5,209,800.00 Rp 4,978,589.08
4 Kaso 5/5 M3 0.61 Rp 4,849,566.00 Rp 2,948,051.17
5 Memasang Rangka Atap M 2 164.52 Rp 260,525.00 Rp 42,861,573.00
6 Memasang Penutup Atap Metal M2 164.52 Rp 249,798.40 Rp 41,096,832.77
7 Bubungan Atap M1 39.02 Rp 127,900.00 Rp 4,990,658.00
8 Listplank M1 51.00 Rp 72,590.00 Rp 3,702,090.00
TOTAL HARGA PEKERJAAN PLAFOND DAN ATAP Rp 164,683,603.37
V PEKERJAAN AIR BERSIH DAN AIR KOTOR

1 Pemasangan pipa 2" M1 16.00 Rp 144,477.50 Rp 2,311,640.00


2 Pemasangan pipa 1/2" M1 46.00 Rp 44,755.00 Rp 2,058,730.00
3 Pemasangan Keran air Bh 4.00 Rp 32,105.00 Rp 128,420.00
TOTAL HARGA PEKERJAAN AIR BERSIH DAN AIR KOTOR Rp 4,498,790.00
VI PEKERJAAN KUSEN DAN PINTU
1 Kusen Pintu
- Pembuatan dan pemasangan Kusen Kayu P1 Bh 4.00 Rp 375,000.00 Rp 1,500,000.00
- Pembuatan dan pemasangan Kusen Kayu P2 Bh 2.00 Rp 325,000.00 Rp 650,000.00
Pembuatan dan Pemasangan Kusen Alumunium J1 M1 17.36 Rp 237,556.60 Rp 4,123,982.58
Pembuatan dan Pemasangan Kusen Alumunium J2 M 1 43.98 Rp 237,556.60 Rp 10,447,739.27
Pembuatan dan Pemasangan Kusen Alumunium J3 M1 10.68 Rp 237,556.60 Rp 2,537,104.49
Pembuatan dan Pemasangan Kusen Alumunium J4 M1 13.64 Rp 237,556.60 Rp 3,240,272.02
2 Daun Pintu
- Pembuatan dan pemasangan Pintu P1 Bh 4.00 Rp 950,000.00 Rp 3,800,000.00
- Pembuatan dan pemasangan Pintu P2 Bh 2.00 Rp 850,000.00 Rp 1,700,000.00
- Kunci Pintu Bh 6.00 Rp 362,425.00 Rp 2,174,550.00
- Penggantung Bh 6.00 Rp 144,356.25 Rp 866,137.50
Daun Jendela Alumunium
- Pembuatan dan Pemasangan J1 M2 3.67 Rp 846,537.83 Rp 3,105,100.74
- Pembuatan dan Pemasangan J2 M2 11.79 Rp 846,537.83 Rp 9,980,680.96
- Pembuatan dan Pemasangan J3 M 2 2.53 Rp 846,537.83 Rp 2,145,126.85
- Pembuatan dan Pemasangan J4 M2 5.21 Rp 846,537.83 Rp 4,412,832.37
TOTAL HARGA PEKERJAAN KUSEN, PINTU DAN JENDELA Rp 50,683,526.78
HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp)
(Rp)
1 2 3 4 5 6
VII PEKERJAAN LAIN - LAIN
1 Pekerjaan Meja beton
- Beton Meja M3 0.48 Rp 6,772,325.00 Rp 3,250,716.00
- Pembesian Besi 8mm Kg 31.92 Rp 32,069.12 Rp 1,023,518.02
- Bekisting M2 2.40 Rp 309,165.00 Rp 741,996.00
- Bongkar Bekisting M2 2.40 Rp 27,489.00 Rp 65,973.60
- Keramik 60cm/60cm M 2 2.40 Rp 893,680.00 Rp 2,144,832.00
- Keramik 10cm/20cm M2 1.40 Rp 132,557.00 Rp 185,579.80
- Sekat pasangan bata M2 1.80 Rp 505,422.25 Rp 909,760.05
- Plesteran M2 3.60 Rp 262,222.40 Rp 944,000.64
- Pemasangan Kitchen shink Bh 2.00 Rp 610,997.50 Rp 1,221,995.00
2 Instalasi Listrik Ls 1.00 Rp 4,650,000.00 Rp 4,650,000.00
3 Pembersihan akhir Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00
TOTAL HARGA PEKERJAAN LAIN -LAIN Rp 16,638,371.11
Kegiatan : Renovasi Rumah Dinas Paramedis Long Nawang
Pekerjaan : Renovasi Rumah Dinas Paramedis Long Nawang
Nomor Kontrak : 012/2143/KONTRAK-RDMLN/DKPPKB/2019
Tanggal Kontrak : 17 Juli 2019
Nilai Kontrak : Rp 875,392,000.00

ITEM PEMBAYARAN YANG TERMASUK GALIAN C

NO ITEM KUANTITAS SAT

1 Pasir Pasang / Pasir Beton 31.54 M3


2 Kerikil Sungai 5.94 M3
3 Pasir Urug 17.16 M3
4 Batu Pecah Mesin 12.44 M3
5 Batu Bata Merah 7,850.40 Bh

Malinau, 19 Desember 2019

Di Rekap Oleh,
Pejabat Pelaksana Teknis
Kegiatan

AGUSTINUS
NIP. 19670816 198903 1 016
RINCIAN PERHITUNGAN MATERIAL GALIAN C PER ITEM PEKERJAAN

Kegiatan : Renovasi Rumah Dinas Paramedis Long Nawang


Pekerjaan : Renovasi Rumah Dinas Paramedis Long Nawang
Nomor Kontrak : 012/2143/KONTRAK-RDMLN/DKPPKB/2019
Tanggal Kontrak : 17 Juli 2019
Nilai Kontrak : Rp 875,392,000.00

VOLUME
NO PEKERJAAN JENIS MATERIAL YANG DIPAKAI KUANTITAS JUMLAH
RAB

1 Pembuatan direksi keet dan gudang Pasir pasang / Pasir Beton 0.0300 36.00 1.08
Kerikil sungai 0.0500 36.00 1.80
2 Sloof 20cm/25cm
Beton sloof Pasir pasang / Pasir Beton 0.5400 1.80 0.97
Kerikil sungai 0.7800 1.80 1.40
3 Kolom Praktis 12cm/12cm
Beton Kolom Pasir pasang / Pasir Beton 0.5400 1.03 0.55
Kerikil sungai 0.7800 1.03 0.80
4 Ring Balok 15cm/25cm
Beton Balok Pasir pasang / Pasir Beton 0.5400 1.35 0.73
Kerikil sungai 0.7800 1.35 1.05
5 Balok Latei 12cm/15cm
Beton Balok Pasir pasang / Pasir Beton 0.5400 0.65 0.35
Kerikil sungai 0.7800 0.65 0.51
6 Urugan Pasir Bawah lantai Pasir urug 1.2000 14.30 17.16
Rabat beton lantai Pasir pasang / Pasir Beton 0.5200 14.30 7.44
Batu pecah mesin 2-3 cm 0.8700 14.30 12.44
7 Lantai Keramik 60cm/60cm Pasir pasang / Pasir Beton 0.0450 138.50 6.23
8 Lantai Keramik 20cm/20cm Pasir pasang / Pasir Beton 0.0420 4.50 0.19
9 Pasangan bata Batu bata ukuran 8 x 8 x 16 cm 60.0000 129.04 7,742.40
Pasir pasang / Pasir Beton 0.0400 129.04 5.16
10 Plesteran dinding bata Pasir pasang / Pasir Beton 0.0310 258.08 8.00
11 Keramik dinding KM/WC 20cm/25cm Pasir pasang / Pasir Beton 0.0180 15.60 0.28
12 Pekerjaan Meja beton
Beton Meja Pasir pasang / Pasir Beton 0.5400 0.48 0.26
Kerikil sungai 0.7800 0.48 0.37
13 Keramik 60cm/60cm Pasir pasang / Pasir Beton 0.0450 2.40 0.11
14 Keramik 10cm/20cm Pasir pasang / Pasir Beton 0.0030 1.40 0.00
15 Sekat pasangan bata Batu bata ukuran 8 x 8 x 16 cm 60.0000 1.80 108.00
Pasir pasang / Pasir Beton 0.0400 1.80 0.07
16 Plesteran Pasir pasang / Pasir Beton 0.0310 3.60 0.11

Anda mungkin juga menyukai