D JUMLAH ( A + B + C ) 139,650.00
D JUMLAH ( A + B + C ) 94,650.00
D JUMLAH ( A + B + C ) 283,650.00
D JUMLAH ( A + B + C ) 129,825.00
A.3.2.1 ANALISA PEKERJAAN PONDASI
A.3.2.1.1 1 M3 PEK. PONDASI BATU BELAH, CAMPURAN 1PC : 3PS
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Batu kali belah m³ 1.2000 125,000.00 150,000.00
2 Semen/Pc kg 202.0000 1,220.00 246,440.00
3 Pasir pasang m³ 0.4850 125,000.00 60,625.00
JUMLAH HARGA BAHAN 457,065.00
B TENAGA
1 Pekerja L.01 OH 1.5000 65,500.00 98,250.00
JUMLAH HARGA TENAGA 98,250.00
C PERALATAN
D JUMLAH ( A + B + C ) 555,315.00
D JUMLAH ( A + B + C ) 512,110.00
D JUMLAH ( A + B + C ) 482,170.00
A.3.2.1.9 1 M3 PEK.PEMASANGAN BATU KOSONG ( AANSTAMPING )
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Batu kali belah m³ 1.2000 125,000.00 150,000.00
2 Pasir urug m³ 0.4320 100,000.00 43,200.00
JUMLAH HARGA BAHAN 193,200.00
B TENAGA
1 Pekerja L.01 OH 0.7800 65,500.00 51,090.00
JUMLAH HARGA TENAGA 51,090.00
C PERALATAN
D JUMLAH ( A + B + C ) 244,290.00
D JUMLAH ( A + B + C ) 666,397.14
A.4.1.1.2 1 M3 LANTAI KERJA BETON MUTU f 'c = 9,8 MPa ( K 125 ), slump ( 12-2 ) cm, w/c = 0,78
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen/Pc kg 276.0000 1,220.00 336,720.00
2 Pasir cor kg 826.0000 107.14 88,500.00
3 Krikil pecah 2-3cm kg 1,012.0000 162.96 164,918.52
4 Air kerja ltr 215.0000 5.00 1,075.00
JUMLAH HARGA BAHAN 591,213.52
B TENAGA
1 Pekerja L.01 OH 1.6500 65,500.00 108,075.00
JUMLAH HARGA TENAGA 108,075.00
C PERALATAN
D JUMLAH ( A + B + C ) 699,288.52
A.4.1.1.5 1 M3 BETON MUTU f 'c = 14,5 MPa ( K 175 ), slump ( 12 ± 2 ) cm, w/c = 0,66
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen/Pc kg 326.0000 1,220.00 397,720.00
2 Pasir cor kg 760.0000 107.14 81,428.57
3 Krikil pecah 2-3cm kg 1,029.0000 162.96 167,688.89
4 Air kerja ltr 215.0000 5.00 1,075.00
JUMLAH HARGA BAHAN 647,912.46
B TENAGA
1 Pekerja L.01 OH 1.6500 65,500.00 108,075.00
JUMLAH HARGA TENAGA 108,075.00
C PERALATAN
D JUMLAH ( A + B + C ) 755,987.46
A.4.1.1.7 1 M3 BETON MUTU f 'c = 19,3 Mpa ( K 225 ), slump ( 12 ± 2 ) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen/Pc kg 371.0000 1,220.00 452,620.00
2 Pasir cor kg 698.0000 107.14 74,785.71
3 Krikil pecah 2-3cm kg 1,047.0000 162.96 170,622.22
4 Air kerja ltr 215.0000 5.00 1,075.00
JUMLAH HARGA BAHAN 699,102.93
B TENAGA
1 Pekerja L.01 OH 1.6500 65,500.00 108,075.00
JUMLAH HARGA TENAGA 108,075.00
C PERALATAN
D JUMLAH ( A + B + C ) 807,177.93
D JUMLAH ( A + B + C ) 8,678.50
A.4.1.1.17a 1 Kg PEK. PEMBESIAN DENGAN BESI ULIR
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Besi beton ulir kg 1.0500 8,000.00 8,400.00
2 Kawat beton kg 0.0150 16,000.00 240.00
JUMLAH HARGA BAHAN 8,640.00
B TENAGA
1 Pekerja L.01 OH 0.0070 65,500.00 458.50
JUMLAH HARGA TENAGA 458.50
C PERALATAN
D JUMLAH ( A + B + C ) 9,098.50
D JUMLAH ( A + B + C ) 149,060.00
D JUMLAH ( A + B + C ) 162,810.00
A.4.1.1.22 1 M2 PEK. BEKISTING UNTUK KOLOM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas III m³ 0.0400 2,750,000.00 110,000.00
2 Paku usuk/reng kg 0.4000 15,000.00 6,000.00
3 Minyak begesting ltr 0.2000 5,000.00 1,000.00
4 Balok kayu kelas III m³ 0.0150 2,750,000.00 41,250.00
5 Triplek 120x240x9mm lbr 0.3500 145,000.00 50,750.00
6 Bambu perancah ø 10cm - 4 m btg 2.0000 9,000.00 18,000.00
JUMLAH HARGA BAHAN 227,000.00
B TENAGA
1 Pekerja L.01 OH 0.6600 65,500.00 43,230.00
JUMLAH HARGA TENAGA 43,230.00
C PERALATAN
D JUMLAH ( A + B + C ) 270,230.00
D JUMLAH ( A + B + C ) 278,480.00
D JUMLAH ( A + B + C ) 306,230.00
A.4.1.1.26 1 M2 PEK. BEKISTING UNTUK TANGGA
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas III m³ 0.0300 2,750,000.00 82,500.00
2 Paku usuk/reng kg 0.4000 15,000.00 6,000.00
3 Minyak begesting ltr 0.1500 5,000.00 750.00
4 Balok kayu kelas III m³ 0.0150 2,750,000.00 41,250.00
5 Triplek 120x240x9mm lbr 0.3500 145,000.00 50,750.00
6 Bambu perancah ø 10cm - 4 m btg 2.0000 9,000.00 18,000.00
JUMLAH HARGA BAHAN 199,250.00
B TENAGA
1 Pekerja L.01 OH 0.6600 65,500.00 43,230.00
JUMLAH HARGA TENAGA 43,230.00
C PERALATAN
D JUMLAH ( A + B + C ) 242,480.00
D JUMLAH ( A + B + C ) 54,064.80
A.4.1.1.35a 1 M1 PEK. BETON KOLOM PRAKTIS BERTULANG 11X11CM (Besi 4Ø12 ; Bg. Ø6-15) - Type B
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas III m³ 0.0020 2,750,000.00 5,500.00
2 Paku usuk/reng kg 0.0100 15,000.00 150.00
3 Minyak begesting ltr - - -
4 Besi beton polos kg 4.1400 7,600.00 31,464.00
5 Kawat beton kg 0.0450 16,000.00 720.00
6 Semen/Pc kg 4.0000 1,220.00 4,880.00
7 Pasir cor beton - 1 m³/1400 kg m³ 0.0060 150,000.00 900.00
8 Krikil pecah 2-3cm - 1 m³ /1350 kg m³ 0.0090 220,000.00 1,980.00
JUMLAH HARGA BAHAN 45,594.00
B TENAGA
1 Pekerja L.01 OH 0.1800 65,500.00 11,790.00
2 Tukang batu L.02 OH 0.0200 89,080.00 1,781.60
3 Tukang kayu L.02 OH 0.0200 89,080.00 1,781.60
4 Tukang besi L.02 OH 0.0200 89,080.00 1,781.60
5 Kepala tukang kayu L.03 OH - 94,975.00 -
6 Mandor L.04 OH - 102,180.00 -
JUMLAH HARGA TENAGA 17,134.80
C PERALATAN
D JUMLAH ( A + B + C ) 62,728.80
A.4.1.1.36 1 M1 PEK. BETON BALOK BERTULANG 10X15CM (Besi 4Ø10 ; Bg. Ø6-15)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas III m³ 0.0020 2,750,000.00 5,500.00
2 Paku usuk/reng kg 0.0100 15,000.00 150.00
3 Minyak begesting ltr - - -
4 Besi beton polos kg 3.6000 7,600.00 27,360.00
5 Kawat beton kg 0.0500 16,000.00 800.00
6 Semen/Pc kg 5.5000 1,220.00 6,710.00
7 Pasir cor beton - 1 m³/1400 kg m³ 0.0090 150,000.00 1,350.00
8 Krikil pecah 2-3cm - 1 m³ /1350 kg m³ 0.0150 220,000.00 3,300.00
JUMLAH HARGA BAHAN 45,170.00
B TENAGA
1 Pekerja L.01 OH 0.2970 65,500.00 19,453.50
2 Tukang batu L.02 OH 0.0330 89,080.00 2,939.64
3 Tukang kayu L.02 OH 0.0330 89,080.00 2,939.64
4 Tukang besi L.02 OH 0.0330 89,080.00 2,939.64
5 Kepala tukang kayu L.03 OH - 94,975.00 -
6 Mandor L.04 OH - 102,180.00 -
JUMLAH HARGA TENAGA 28,272.42
C PERALATAN
D JUMLAH ( A + B + C ) 20,030.00
A.4.2.1.2 1 Kg PEK. RANGKA KUDA - KUDA BAJA IWF
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Baja WF kg 1.1500 15,000.00 17,250.00
JUMLAH HARGA BAHAN 17,250.00
B TENAGA
1 Pekerja L.01 OH 0.0600 65,500.00 3,930.00
JUMLAH HARGA TENAGA 3,930.00
C PERALATAN
D JUMLAH ( A + B + C ) 21,180.00
D JUMLAH ( A + B + C ) 20,030.00
D JUMLAH ( A + B + C ) 19,455.00
D JUMLAH ( A + B + C ) 66,550.00
E Untuk 1 kg 665.50
A.4.2.1.5 1 CM PEK. PENGELASAN DENGAN LAS LISTRIK
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kawat las kg 0.0400 30,000.00 1,200.00
2 Solar ltr 0.0300 7,000.00 210.00
3 Minyak pelumas ltr 0.0040 30,000.00 120.00
JUMLAH HARGA BAHAN 1,530.00
B TENAGA
1 Pekerja L.01 OH 0.0040 65,500.00 262.00
JUMLAH HARGA TENAGA 262.00
C PERALATAN
1 Mesin las (sewa) Jam 0.0170 12,500.00 212.50
JUMLAH HARGA PERALATAN 212.50
D JUMLAH ( A + B + C ) 2,004.50
D JUMLAH ( A + B + C ) 698,000.00
D JUMLAH ( A + B + C ) 152,782.50
D JUMLAH ( A + B + C ) 588,925.00
A.4.2.1.12a 1 M2 PEK. DAUN PINTU DILAPIS MULTIPLEK/ KACA 5MM,RANGKA ALLUMINIUM (UK.140X200)CM = 2,80M2
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Frame jendela aluminium 3x8 silver m¹ 12.7600 80,000.00 1,020,800.00
2 Perlengkapan (Harga kusen) Hb 15% 1,020,800.00 153,120.00
3 Profil kaca m¹ 12.3200 15,000.00 184,800.00
4 Kaca bening 5mm m² 0.1984 129,500.00 25,692.80
5 Triplek 120x240x9mm lbr 0.7128 145,000.00 103,356.00
JUMLAH HARGA BAHAN 1,487,768.80
B TENAGA
1 Pekerja L.01 OH 0.5000 65,500.00 32,750.00
JUMLAH HARGA TENAGA 32,750.00
C PERALATAN
A.4.2.1 (LS.15) 1 UNIT PEK. DAUN PINTU KACA TEMPRED 12 MM UK. (160X220) CM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kaca tempred 12mm (Diamond) #N/A 3.8720 1,750,000.00 6,776,000.00
2 Fitting kaca sekualitas Dekson #N/A 4.0000 975,000.00 3,900,000.00
3 Floorhinges sekulitas Dekson #N/A 2.0000 1,350,000.00 2,700,000.00
4 Handle pintu stainless steel T.60cm #N/A 4.0000 750,000.00 3,000,000.00
5 Kunci pintu aluminium #N/A 2.0000 375,000.00 750,000.00
JUMLAH HARGA BAHAN 17,126,000.00
B TENAGA
1 Biaya Pemasangan 20 % x Hb Ls 0.2000 17,126,000.00 3,425,200.00
JUMLAH HARGA TENAGA 3,425,200.00
C PERALATAN
D JUMLAH ( A + B + C ) 20,551,200.00
D JUMLAH ( A + B + C ) 204,750.00
D JUMLAH ( A + B + C ) 207,900.00
A.4.4.1 ANALISA PEKERJAAN DINDING
A.4.4.1.2 1 M2 PEK. DINDING UKURAN ( 5 X 11 X 22 ) CM TEBAL 1 BATA, CAMPURAN 1C : 3PS
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Bata merah klas I bh 140.0000 575.00 80,500.00
2 Semen/Pc kg 32.9500 1,220.00 40,199.00
3 Pasir pasang m³ 0.0910 125,000.00 11,375.00
JUMLAH HARGA BAHAN 132,074.00
B TENAGA
1 Pekerja L.01 OH 0.6000 65,500.00 39,300.00
JUMLAH HARGA TENAGA 39,300.00
C PERALATAN
D JUMLAH ( A + B + C ) 171,374.00
D JUMLAH ( A + B + C ) 163,816.00
D JUMLAH ( A + B + C ) 159,634.00
D JUMLAH ( A + B + C ) 59,900.00
A.4.4.1.8 1 M2 PEK. DINDING UKURAN ( 5 X 11 X 22 ) CM TEBAL 1/2 BATA, CAMPURAN 1C : 3PS
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Bata merah klas I bh 70.0000 575.00 40,250.00
2 Semen/Pc kg 14.3700 1,220.00 17,531.40
3 Pasir pasang m³ 0.0400 125,000.00 5,000.00
JUMLAH HARGA BAHAN 62,781.40
B TENAGA
1 Pekerja L.01 OH 0.3000 65,500.00 19,650.00
JUMLAH HARGA TENAGA 19,650.00
C PERALATAN
D JUMLAH ( A + B + C ) 82,431.40
D JUMLAH ( A + B + C ) 79,305.00
D JUMLAH ( A + B + C ) 77,334.60
D JUMLAH ( A + B + C ) 199,945.00
A.4.4.2 ANALISA PEKERJAAN PLESTERAN
A.4.4.2.2 1 M2 PLESTERAN 1PC : 2PS TEBAL 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen/Pc kg 10.2240 1,220.00 12,473.28
2 Pasir pasang m³ 0.0200 125,000.00 2,500.00
JUMLAH HARGA BAHAN 14,973.28
B TENAGA
1 Pekerja L.01 OH 0.3000 65,500.00 19,650.00
JUMLAH HARGA TENAGA 19,650.00
C PERALATAN
D JUMLAH ( A + B + C ) 34,623.28
D JUMLAH ( A + B + C ) 32,011.72
D JUMLAH ( A + B + C ) 30,262.80
D JUMLAH ( A + B + C ) 29,224.48
A.4.4.2.26 1 M2 SIARAN PONDASI 1PC : 2PS
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen/Pc kg 6.3400 1,220.00 7,734.80
2 Pasir pasang m³ 0.0120 125,000.00 1,500.00
JUMLAH HARGA BAHAN 9,234.80
B TENAGA
1 Pekerja L.01 OH 0.3000 65,500.00 19,650.00
JUMLAH HARGA TENAGA 19,650.00
C PERALATAN
D JUMLAH ( A + B + C ) 28,884.80
A.4.4.2.27 1 M2 ACIAN PC
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Semen/Pc kg 3.2500 1,220.00 3,965.00
JUMLAH HARGA BAHAN 3,965.00
B TENAGA
1 Pekerja L.01 OH 0.2000 65,500.00 13,100.00
JUMLAH HARGA TENAGA 13,100.00
C PERALATAN
D JUMLAH ( A + B + C ) 17,065.00
D JUMLAH ( A + B + C ) 153,075.00
A.4.4.3.35.1 1 M2 LANTAI GRANITE TILE ( 30 X 30 ) CM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Granite tile 30x30cm m² 1.0700 265,000.00 283,550.00
2 Semen/Pc kg 10.0000 1,220.00 12,200.00
3 Pasir pasang m³ 0.0450 125,000.00 5,625.00
4 Semen warna mutu baik kg 1.5000 16,800.00 25,200.00
JUMLAH HARGA BAHAN 326,575.00
B TENAGA
1 Pekerja L.01 OH 0.7000 65,500.00 45,850.00
JUMLAH HARGA TENAGA 45,850.00
C PERALATAN
D JUMLAH ( A + B + C ) 372,425.00
D JUMLAH ( A + B + C ) 143,831.00
D JUMLAH ( A + B + C ) 424,731.00
A.4.4.3.35.4 1 M2 LANTAI GRANITE TILE ( 30 X 60 ) CM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Granite tile 30x60cm m² 1.0600 275,000.00 291,500.00
2 Semen/Pc kg 9.8000 1,220.00 11,956.00
3 Pasir pasang m³ 0.0450 125,000.00 5,625.00
4 Semen warna mutu baik kg 1.0000 16,800.00 16,800.00
JUMLAH HARGA BAHAN 325,881.00
B TENAGA
1 Pekerja L.01 OH 0.7000 65,500.00 45,850.00
JUMLAH HARGA TENAGA 45,850.00
C PERALATAN
D JUMLAH ( A + B + C ) 371,731.00
D JUMLAH ( A + B + C ) 151,269.00
D JUMLAH ( A + B + C ) 155,638.00
A.4.4.3.39.1 1 M2 DINDING KERAMIK ( 30 X 30 ) CM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Keramik 30x30cm kw 1 (mutu menengah) m² 1.0600 60,000.00 63,600.00
2 Semen/Pc kg 9.3000 1,220.00 11,346.00
3 Pasir pasang m³ 0.0180 125,000.00 2,250.00
4 Semen warna mutu baik kg 1.9400 16,800.00 32,592.00
JUMLAH HARGA BAHAN 109,788.00
B TENAGA
1 Pekerja L.01 OH 0.7000 65,500.00 45,850.00
JUMLAH HARGA TENAGA 45,850.00
C PERALATAN
D JUMLAH ( A + B + C ) 155,638.00
D JUMLAH ( A + B + C ) 155,638.00
D JUMLAH ( A + B + C ) 383,538.00
A.4.4.3.40 1 M1 PLINT KERAMIK LIST ( 10 X 20 ) CM KERAMIK KEMBANG - MUTU MENENGAH
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Keramik kembang 10x20cm kw 1 bh 5.5000 8,500.00 46,750.00
2 Semen/Pc kg 1.6500 1,220.00 2,013.00
3 Pasir pasang m³ 0.0032 125,000.00 400.00
4 Semen warna mutu baik kg 0.1000 16,800.00 1,680.00
JUMLAH HARGA BAHAN 50,843.00
B TENAGA
1 Pekerja L.01 OH 0.0900 65,500.00 5,895.00
JUMLAH HARGA TENAGA 5,895.00
C PERALATAN
D JUMLAH ( A + B + C ) 56,738.00
D JUMLAH ( A + B + C ) 24,535.72
D JUMLAH ( A + B + C ) 29,988.18
A.4.4.3.41.3 1 M1 PLINT GRANITE TILE ( 15 X 60 ) CM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Granite tile 15x60cm m² 1.6667 27,083.33 45,138.89
2 Semen/Pc kg 1.6500 1,220.00 2,013.00
3 Pasir pasang m³ 0.0032 125,000.00 400.00
4 Semen warna mutu baik kg 0.1000 16,800.00 1,680.00
JUMLAH HARGA BAHAN 49,231.89
B TENAGA
1 Pekerja L.01 OH 0.0900 65,500.00 5,895.00
JUMLAH HARGA TENAGA 5,895.00
C PERALATAN
D JUMLAH ( A + B + C ) 55,126.89
D JUMLAH ( A + B + C ) 224,320.00
D JUMLAH ( A + B + C ) 224,320.00
A.4.5.1 ANALISA PEKERJAAN PLAFOND
A.4.5.1.5a 1 M2 PLAFOND KALSIBOARD, RANGKA LANGIT-LANGI KAYU KLAS II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Balok kayu kelas II m³ 0.0163 5,675,000.00 92,502.50
2 Paku usuk/reng kg 0.2500 15,000.00 3,750.00
3 Paku kalsi kg 0.0500 30,000.00 1,500.00
4 Kalsiboard 120x240x3,5mm lbr 0.3600 77,500.00 27,900.00
JUMLAH HARGA BAHAN 125,652.50
B TENAGA
1 Pekerja L.01 OH 0.3000 65,500.00 19,650.00
JUMLAH HARGA TENAGA 19,650.00
C PERALATAN
D JUMLAH ( A + B + C ) 145,302.50
D JUMLAH ( A + B + C ) 160,152.50
D JUMLAH ( A + B + C ) 94,150.00
A.4.5.1.8 1 M¹ LIST PLAFOND GYPSUM C7
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 List plafond gypsum C7 m¹ 1.0500 11,500.00 12,075.00
2 Paku piles bh 2.0000 400.00 800.00
JUMLAH HARGA BAHAN 12,875.00
B TENAGA
1 Pekerja L.01 OH 0.1000 65,500.00 6,550.00
JUMLAH HARGA TENAGA 6,550.00
C PERALATAN
D JUMLAH ( A + B + C ) 19,425.00
D JUMLAH ( A + B + C ) 13,525.00
D JUMLAH ( A + B + C ) 51,850.00
D JUMLAH ( A + B + C ) 144,467.50
A.4.5.2.2a 1 M2 PEKERJAAN PASANGAN ULANG ATAP GENTENG BETON FLAT LAMA
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Atap genteng beton flat press minimalis warna m² - - -
2 Paku sekrup anti karat bh 11.0000 750.00 8,250.00
JUMLAH HARGA BAHAN 8,250.00
B TENAGA
1 Pekerja L.01 OH 0.2000 65,500.00 13,100.00
JUMLAH HARGA TENAGA 13,100.00
C PERALATAN
1 Mesin bor (sewa) Jam - - -
2 Listrik kwh - - -
JUMLAH HARGA PERALATAN -
D JUMLAH ( A + B + C ) 21,350.00
D JUMLAH ( A + B + C ) 57,960.00
A.4.5.2.5.1 1 M1 PEKERJAAN BUBUNGAN GENTENG BETON FLAT PRESS
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Bubungan genteng beton flat press bh 3.5000 12,100.00 42,350.00
2 Paku sekrup - - - -
3 Semen/Pc #N/A 8.0000 1,220.00 9,760.00
4 Pasir pasang #N/A 0.0320 125,000.00 4,000.00
JUMLAH HARGA BAHAN 56,110.00
B TENAGA
1 Pekerja L.01 OH 0.4000 65,500.00 26,200.00
JUMLAH HARGA TENAGA 26,200.00
C PERALATAN
D JUMLAH ( A + B + C ) 82,310.00
D JUMLAH ( A + B + C ) 82,975.00
D JUMLAH ( A + B + C ) 114,600.00
A.4.5.2.42 1 M1 PEKERJAAN TALANG PATAHAN ZINKCALUME 0,35MM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Seng plat zinkcalume 0,35mm lbr 0.5000 69,500.00 34,750.00
2 Papan kayu kelas II m³ 0.0096 5,450,000.00 52,320.00
3 Paku seng kg 0.0150 20,000.00 300.00
4 Meny besi kg 0.2500 12,500.00 3,125.00
JUMLAH HARGA BAHAN 90,495.00
B TENAGA
1 Pekerja L.01 OH 0.1500 65,500.00 9,825.00
JUMLAH HARGA TENAGA 9,825.00
C PERALATAN
D JUMLAH ( A + B + C ) 100,320.00
D JUMLAH ( A + B + C ) 6,674,250.00
D JUMLAH ( A + B + C ) 6,674,250.00
A.4.6.1.5 1 M² MEMBUAT DAN MEMASANG DAUN PINTU PANEL KAYU KLAS II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas II m³ 0.0400 5,450,000.00 218,000.00
2 Lem kayu kg 0.5000 40,000.00 20,000.00
JUMLAH HARGA BAHAN 238,000.00
B TENAGA
1 Pekerja L.01 OH 1.0000 65,500.00 65,500.00
JUMLAH HARGA TENAGA 65,500.00
C PERALATAN
D JUMLAH ( A + B + C ) 303,500.00
A.4.6.1.5a 1 M² MEMBUAT DAN MEMASANG DAUN PINTU PANEL KAYU KLAS II, DALAM DILAPISI TRIPLEK ALUMINIUM - PINTU TOILET
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas II m³ 0.0400 5,450,000.00 218,000.00
2 Lem kayu kg 0.5000 40,000.00 20,000.00
3 Triplek aluminium lbr 0.4000 130,000.00 52,000.00
JUMLAH HARGA BAHAN 290,000.00
B TENAGA
1 Pekerja L.01 OH 1.0000 65,500.00 65,500.00
JUMLAH HARGA TENAGA 65,500.00
C PERALATAN
D JUMLAH ( A + B + C ) 355,500.00
A.4.6.1.5b 1 M² MEMBUAT DAN MEMASANG DAUN PINTU DOUBLE TEAKWOOD RANGKA KAYU KLAS II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas II #N/A 0.0250 5,450,000.00 136,250.00
2 Lem kayu #N/A 0.5000 40,000.00 20,000.00
3 Teakwood 120x240x4mm #N/A 0.7200 106,250.00 76,500.00
JUMLAH HARGA BAHAN 232,750.00
B TENAGA
1 Pekerja L.01 OH 0.6000 65,500.00 39,300.00
JUMLAH HARGA TENAGA 39,300.00
C PERALATAN
D JUMLAH ( A + B + C ) 272,050.00
A.4.6.1.5c 1 M² MEMBUAT DAN MEMASANG DAUN PINTU LUAR TEAKWOOD,DALAM LAPIS TRIPLEK ALUMINIUM RANGKA KAYU KLAS II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas II #N/A 0.0250 5,450,000.00 136,250.00
2 Lem kayu #N/A 0.5000 40,000.00 20,000.00
3 Teakwood 120x240x4mm #N/A 0.3600 106,250.00 38,250.00
4 Triplek aluminium #N/A 0.3600 130,000.00 46,800.00
JUMLAH HARGA BAHAN 241,300.00
B TENAGA
1 Pekerja L.01 OH 0.6000 65,500.00 39,300.00
JUMLAH HARGA TENAGA 39,300.00
C PERALATAN
D JUMLAH ( A + B + C ) 280,600.00
D JUMLAH ( A + B + C ) 473,417.75
D JUMLAH ( A + B + C ) 502,217.75
A.4.6.1.13 1 M3 PASANGAN KONSTRUKSI KUDA-KUDA KAYU KLAS II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Balok kayu kelas II m³ 1.1000 5,675,000.00 6,242,500.00
2 Paku usuk/reng kg 5.6000 15,000.00 84,000.00
3 Begel plat strip kg 15.0000 30,900.00 463,500.00
JUMLAH HARGA BAHAN 6,790,000.00
B TENAGA
1 Pekerja L.01 OH 4.0000 65,500.00 262,000.00
JUMLAH HARGA TENAGA 262,000.00
C PERALATAN
D JUMLAH ( A + B + C ) 7,052,000.00
D JUMLAH ( A + B + C ) 6,947,200.00
D JUMLAH ( A + B + C ) 110,180.00
A.4.6.1.21 1 M1 PASANGAN LISPLANK 3/20 KAYU KLAS I
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Papan kayu kelas I m³ 0.0108 12,000,000.00 129,600.00
2 Paku usuk/reng kg 0.1000 15,000.00 1,500.00
JUMLAH HARGA BAHAN 131,100.00
B TENAGA
1 Pekerja L.01 OH 0.1000 65,500.00 6,550.00
JUMLAH HARGA TENAGA 6,550.00
C PERALATAN
D JUMLAH ( A + B + C ) 137,650.00
D JUMLAH ( A + B + C ) 140,050.00
D JUMLAH ( A + B + C ) 57,550.00
D JUMLAH ( A + B + C ) 38,300.00
A.4.6.1.24b 1 M2 PASANGAN DINDING TEAKBLOK T.1,8MM DILAPIS HPL
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Balok kayu kelas II #N/A 0.0018 5,675,000.00 10,215.00
2 Paku usuk/reng #N/A 0.1500 15,000.00 2,250.00
3 Teakblok 120x240x1,8mm #N/A 1.1821 265,000.00 313,261.28
4 Lapisan HPL (Uk.120x240)cm #N/A 1.0943 218,750.00 239,371.74
5 Lem kayu #N/A 0.5000 40,000.00 20,000.00
JUMLAH HARGA BAHAN 585,098.02
B TENAGA
1 Pekerja L.01 OH 0.5000 65,500.00 32,750.00
JUMLAH HARGA TENAGA 32,750.00
C PERALATAN
D JUMLAH ( A + B + C ) 617,848.02
D JUMLAH ( A + B + C ) 45,490.00
D JUMLAH ( A + B + C ) 80,655.00
D JUMLAH ( A + B + C ) 63,327.50
A.4.6.2.5 MEMASANG 1 BUAH ENGSEL PINTU
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Engsel pintu klas biasa bh 1.0000 16,550.00 16,550.00
JUMLAH HARGA BAHAN 16,550.00
B TENAGA
1 Pekerja L.01 OH 0.0150 65,500.00 982.50
JUMLAH HARGA TENAGA 982.50
C PERALATAN
D JUMLAH ( A + B + C ) 17,532.50
D JUMLAH ( A + B + C ) 50,982.50
D JUMLAH ( A + B + C ) 23,155.00
D JUMLAH ( A + B + C ) 15,982.50
A.4.6.2.9 MEMASANG 1 BUAH GRENDEL JENDELA
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Grendel jendela klas tinggi bh 1.0000 12,500.00 12,500.00
JUMLAH HARGA BAHAN 12,500.00
B TENAGA
1 Pekerja L.01 OH 0.0200 65,500.00 1,310.00
JUMLAH HARGA TENAGA 1,310.00
C PERALATAN
D JUMLAH ( A + B + C ) 46,310.00
D JUMLAH ( A + B + C ) 433,215.00
A.4.6.2.11c MEMASANG 1 SET REL PINTU DORONG LEBAR PINTU 130CM - S6
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Rel pintu dorong S6 - lebar pintu 130cm set 1.0000 625,000.00 625,000.00
2 Aluminium strip/rel pintu m¹ 2.5300 18,500.00 46,805.00
JUMLAH HARGA BAHAN 671,805.00
B TENAGA
1 Pekerja L.01 OH 0.0100 65,500.00 655.00
JUMLAH HARGA TENAGA 655.00
C PERALATAN
D JUMLAH ( A + B + C ) 672,460.00
D JUMLAH ( A + B + C ) 226,310.00
D JUMLAH ( A + B + C ) 114,832.50
D JUMLAH ( A + B + C ) 143,432.50
A.4.6.2.17a MEMASANG 1 M2 KACA RYBEN TEBAL 5MM
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kaca ryben 5mm m² 1.1000 135,975.00 149,572.50
JUMLAH HARGA BAHAN 149,572.50
B TENAGA
1 Pekerja L.01 OH 0.0150 65,500.00 982.50
JUMLAH HARGA TENAGA 982.50
C PERALATAN
D JUMLAH ( A + B + C ) 150,555.00
D JUMLAH ( A + B + C ) 44,748.00
A.4.7.1.4a 1 M2 PENGECATAN KAYU BARU (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Plamir Kayu kg 0.1500 25,000.00 3,750.00
2 Minyak cat klas menengah ltr 0.0300 11,000.00 330.00
3 Amplas lbr 0.2000 3,750.00 750.00
4 Kuas cat bh 0.0100 6,800.00 68.00
Cat dasar Cat kayu klas menengah kg 0.1700 55,000.00 9,350.00
Cat penutup Cat kayu klas menengah kg 0.2600 55,000.00 14,300.00
JUMLAH HARGA BAHAN 28,548.00
B TENAGA
1 Pekerja L.01 OH 0.2000 65,500.00 13,100.00
JUMLAH HARGA TENAGA 13,100.00
C PERALATAN
D JUMLAH ( A + B + C ) 41,648.00
A.4.7.1.7 1 M2 POLITURAN DAUN PINTU (2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Wood filer ltr 0.1000 25,200.00 2,520.00
2 Politur ltr 0.3720 57,000.00 21,204.00
3 Amplas lbr 2.0000 3,750.00 7,500.00
JUMLAH HARGA BAHAN 31,224.00
B TENAGA
1 Pekerja L.01 OH 0.2000 65,500.00 13,100.00
JUMLAH HARGA TENAGA 13,100.00
C PERALATAN
D JUMLAH ( A + B + C ) 44,324.00
A.4.7.1.10 1 M2 PENGECATAN TEMBOK BARU - INTERIOR (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
Plamir tembok
1 kg 0.1000 9,000.00 900.00
Cat dasar Cat tembok klas menengah kg 0.1000 31,500.00 3,150.00
Cat penutup Cat tembok klas menengah kg 0.2600 31,500.00 8,190.00
JUMLAH HARGA BAHAN 12,240.00
B TENAGA
1 Pekerja L.01 OH 0.0200 65,500.00 1,310.00
JUMLAH HARGA TENAGA 1,310.00
C PERALATAN
D JUMLAH ( A + B + C ) 13,550.00
A.4.7.1.10a 1 M2 PENGECATAN TEMBOK BARU - EXSTERIOR (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
Alkali (anti jamur)
1 kg 0.1000 46,200.00 4,620.00
Cat dasar Cat tembok klas tinggi kg 0.1000 89,000.00 8,900.00
Cat penutup Cat tembok klas tinggi kg 0.2600 89,000.00 23,140.00
JUMLAH HARGA BAHAN 36,660.00
B TENAGA
1 Pekerja L.01 OH 0.0200 65,500.00 1,310.00
JUMLAH HARGA TENAGA 1,310.00
C PERALATAN
D JUMLAH ( A + B + C ) 37,970.00
A.4.7.1.10b 1 M2 PENGECATAN TEMBOK LAMA - INTERIOR (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
Plamir tembok
1 kg - - -
Cat dasar Cat tembok klas menengah kg 0.1000 31,500.00 3,150.00
Cat penutup Cat tembok klas menengah kg 0.2600 31,500.00 8,190.00
JUMLAH HARGA BAHAN 11,340.00
B TENAGA
1 Pekerja L.01 OH 0.0200 65,500.00 1,310.00
JUMLAH HARGA TENAGA 1,310.00
C PERALATAN
D JUMLAH ( A + B + C ) 12,650.00
D JUMLAH ( A + B + C ) 15,678.00
D JUMLAH ( A + B + C ) 4,628.00
D JUMLAH ( A + B + C ) 20,878.00
A.5.1.1 ANALISA PEKERJAAN SANITASI
A.5.1.1.1 MEMASANG 1 BUAH KLOSED DUDUK
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
Closed duduk monoblok (Sekualitas Toto) unit 1.0000 2,350,000.00 2,350,000.00
Perlengkapan (6% dari harga klosed) HK 0.0600 2,350,000.00 141,000.00
JUMLAH HARGA BAHAN 2,491,000.00
B TENAGA
1 Pekerja L.01 OH 3.3000 65,500.00 216,150.00
JUMLAH HARGA TENAGA 216,150.00
C PERALATAN
D JUMLAH ( A + B + C ) 2,707,150.00
D JUMLAH ( A + B + C ) 259,070.00
D JUMLAH ( A + B + C ) 877,400.00
A.5.1.1.5 MEMASANG 1 BUAH WASTAFLE
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Washtafel komplit kran unit 1.0000 550,000.00 550,000.00
2 Perlengkapan (12%) hk 0.1200 550,000.00 66,000.00
3 Semen/Pc kg 6.0000 1,220.00 7,320.00
4 Pasir pasang m³ 0.0100 125,000.00 1,250.00
JUMLAH HARGA BAHAN 624,570.00
B TENAGA
1 Pekerja L.01 OH 1.2000 65,500.00 78,600.00
JUMLAH HARGA TENAGA 78,600.00
C PERALATAN
D JUMLAH ( A + B + C ) 703,170.00
D JUMLAH ( A + B + C ) 87,901.60
D JUMLAH ( A + B + C ) 48,897.00
A.5.1.1.20 MEMASANG 1 M PIPA GIP MEDIUM B - Ø 3/4"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Pipa GI ø 3/4" - Medium B m¹ 1.2000 31,000.00 37,200.00
2 Perlengkapan (Support) 35% harga pipa Ls 0.3500 37,200.00 13,020.00
JUMLAH HARGA BAHAN 50,220.00
B TENAGA
1 Pekerja L.01 OH 0.0540 65,500.00 3,537.00
JUMLAH HARGA TENAGA 3,537.00
C PERALATAN
D JUMLAH ( A + B + C ) 53,757.00
D JUMLAH ( A + B + C ) 64,287.00
D JUMLAH ( A + B + C ) 9,948.00
D JUMLAH ( A + B + C ) 12,708.00
A.5.1.1.27 MEMASANG 1 M PIPA PVC TIPE AW DIAMETER 1"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Pipa PVC ø 1 " - Aw m¹ 1.2000 12,500.00 15,000.00
2 Perlengkapan (Support) 15% harga pipa Ls 0.1500 15,000.00 2,250.00
JUMLAH HARGA BAHAN 17,250.00
B TENAGA
1 Pekerja L.01 OH 0.0360 65,500.00 2,358.00
JUMLAH HARGA TENAGA 2,358.00
C PERALATAN
D JUMLAH ( A + B + C ) 19,608.00
D JUMLAH ( A + B + C ) 25,272.00
D JUMLAH ( A + B + C ) 45,325.50
D JUMLAH ( A + B + C ) 64,645.50
A.5.1.1.33 MEMASANG 1 BAK CUCI PIRING STAILESS STEEL
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Bak stainless steel 1 lobang unit 1.0000 350,000.00 350,000.00
2 Water Drain + accessoris unit 1.0000 - -
JUMLAH HARGA BAHAN 350,000.00
B TENAGA
1 Pekerja L.01 OH 0.0300 65,500.00 1,965.00
JUMLAH HARGA TENAGA 1,965.00
C PERALATAN
D JUMLAH ( A + B + C ) 351,965.00
D JUMLAH ( A + B + C ) 20,730.00
D JUMLAH ( A + B + C ) 175,730.00
D JUMLAH ( A + B + C ) 275,730.00
A.5.1.1.35c MEMASANG 1 BUAH KRAN WASHTAFLE Ø 1/2"
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A BAHAN
1 Kran washtafle ø 1/2" bh 1.0000 175,000.00 175,000.00
2 Seal tape bh 0.0250 3,000.00 75.00
JUMLAH HARGA BAHAN 175,075.00
B TENAGA
1 Pekerja L.01 OH 0.0100 65,500.00 655.00
JUMLAH HARGA TENAGA 655.00
C PERALATAN
D JUMLAH ( A + B + C ) 91,405.00
D JUMLAH ( A + B + C ) 122,035.00
BACK UP VOLUME
PEKERJAAN #REF!
LOKASI #REF!
TAHUN #REF!
I PEK. PASANGAN/PLESTERAN
1 PAS. TRASRAM 1/2 BT. VOLUME = P x T x SISI 107.00 M2
Depan = 6.45 x 0.63 x 1.00 = 4.06 M2
= 6.45 x 0.45 x 1.00 = 2.90 M2
= 4.40 x 0.45 x 4.00 = 7.92 M2
= 14.00 x 0.45 x 2.00 = 12.60 M2
= 6.90 x 0.63 x 1.00 = 4.35 M2
= 6.90 x 0.45 x 1.00 = 3.11 M2
= 4.80 x 0.45 x 2.00 = 4.32 M2
Samping barat = 25.25 x 0.45 x 2.00 = 22.73 M2
Samping timur = 9.90 x 0.63 x 1.00 = 6.24 M2
= 9.90 x 0.45 x 1.00 = 4.46 M2
= 8.70 x 0.63 x 1.00 = 5.48 M2
= 8.70 x 0.45 x 1.00 = 3.92 M2
Belakang = 27.70 x 0.45 x 2.00 = 24.93 M2
107.00 M2
I PEK. PASANGAN/PLESTERAN
1 PAS. TRASRAM 1 BT. VOLUME = P x T x SISI 6.00 M2
= 1.50 x 1.00 x 2.00 = 3.00 M2
= 1.50 x 1.00 x 2.00 = 3.00 M2
6.00 M2
II PEKERJAAN BETON
1 Lantai kerja VOLUME = P x L x T 0.27 M3
= 3.20 x 1.70 x 0.05 = 0.27 M3
0.27 M3
PEKERJAAN #REF!
LOKASI #REF!
TAHUN #REF!
II PEK.BETON RINGBALK
1 RINGBALK 10/20 VOL. = P x DIMENSI x JMH 1.65 M3
Bagian Luar 17.00 = 17.00 x 0.10 x 0.20 x 2.00 = 0.68 M3
10.50 = 10.50 x 0.10 x 0.20 x 2.00 = 0.42 M3
Bagian Dalam -
9.00 = 9.00 x 0.10 x 0.20 x 1.00 = - M3
6.00 = 6.00 x 0.10 x 0.20 x 1.00 = 0.12 M3
3.00 = 3.00 x 0.10 x 0.20 x 1.00 = 0.06 M3
melintang 10.50 = 10.50 x 0.10 x 0.20 x 1.00 = 0.21 M3
4.10 = 4.10 x 0.10 x 0.20 x 2.00 = 0.16 M3
1.65 M3
III PEKERJAAN PLESTERAN
1 PLESTERAN BETON P/T x L x JMH 82.72 M2
a. Kolom 25/30 = 4.00 x 1.10 x 17.00 = 74.80 M2
b. Balok Beton Luar 3.00 = 3.00 x 0.30 x 8.00 = 7.20 M2
memanjang 2.40 = 2.40 x 0.30 x 1.00 = 0.72 M2
82.72 M2
V PEKERJAAN KERAMIK
1 LANTAI KERAMIK 40 X 40 KW.1 VOL. = P x L x JMH 166.50 M2
= 17.00 x 10.50 x 1.00 - 12.00 = 166.50 M2
166.50 M2
VI PEKERJAAN PLAFOND
1 PLAFOND KALSIBOARD VOL. = P x L x JMH 178.50 M2
Bangunan = 17.00 x 10.50 x 1.00 = 178.50 M2
178.50 M1
IX PEKERJAAN PARTISI
1 PARTISI RANGKA KAYU VOL. = P x T x JMH 25.31 M2
PR 5 = 4.00 x 2.10 x 1.00 = 8.40 M2
PR 6 = 3.54 x 2.10 x 2.00 = 14.87 M2
= 0.31 x 3.30 x 2.00 = 2.05 M2
25.31 M2
IX PEKERJAAN SANITASI
SANITAIR Volume = JMH JMH
1 Closed Duduk Monoblok = 1.00 x 1.00 = 1.00 Bh
2 Floor drain /saringan air = 1.00 x 1.00 = 1.00 Bh 1.00 Bh
3 Kran air Ø 1/2" = 1.00 x 1.00 = 1.00 Bh 1.00 Bh
4 Kran Closet Ø 1/2" = 1.00 x 1.00 = 1.00 Bh
5 Kran bebekan Ø 1/2" = 1.00 x 1.00 = 1.00 Bh
6 Bak stainless = 1.00 x 1.00 = 1.00 Bh
PLUMBING/PIPA
1 Masang Pipa PVC Ø 1/2 " PJG x JMH 210.00 M1
closet = 1.50 x 20.00 = 30.00 M1
washtafle = 1.50 x 20.00 = 30.00 M1
handsower = 1.50 x 20.00 = 30.00 M1
samb. = 4.00 x 20.00 = 80.00 M1
= 2.00 x 20.00 = 40.00 M1
210.00 M1
X PEKERJAAN PENGECATAN
1 Pengecatan Kayu 60.29 M2
A KUSEN PINTU/JENDELA Volume = P x kllg x JMH
A Kusen pintu jendela
KP1 kusen = 5.80 x 0.23 x 4.00 = 5.34 M2
= 0.80 x 0.36 x 4.00 = 1.15 M2
KP2 kusen = 6.30 x 0.23 x 1.00 = 1.45 M2
= 1.70 x 0.36 x 1.00 = 0.61 M2
ventilasi = 3.96 x 0.22 x 1.00 = 0.87 M2
KPJ2 kusen = 8.85 x 0.23 x 2.00 = 4.07 M2
= 1.20 x 0.36 x 2.00 = 0.86 M2
KJ2 kusen = 5.70 x 0.23 x 6.00 = 7.87 M2
= 2.65 x 0.36 x 6.00 = 5.72 M2
jendela = 4.30 x 0.22 x 12.00 = 11.35 M2
ventilasi = 2.60 x 0.22 x 12.00 = 6.86 M2
B Kusen Partisi -
PR5 kusen = 10.20 x 0.23 x 1.00 = 2.35 M2
= 4.40 x 0.34 x 1.00 = 1.50 M2
PR6 kusen = 9.66 x 0.23 x 2.00 = 4.44 M2
= 8.60 x 0.34 x 2.00 = 5.85 M2
60.29 M2
I LUAS BANGUNAN
1 LUAS BANGUNAN VOL. = P x L x JMH 13.50 M2
SELASAR plat = 3.00 x 3.00 x 0.50 = 4.50 M2
= 2.00 x 6.00 x 0.50 = 6.00 M2
= 3.00 x 2.00 x 0.50 = 3.00 M2
13.50 M2
II PEKERJAAN TANAH
1 GALIAN PONDASI VOL. = P x L x T x JMH 20.70 M3
memanjang 3.00 = 3.00 x 0.90 x 1.00 x 1.00 = 2.70 M3
melintang 2.00 = 2.00 x 0.90 x 1.00 x 1.00 = 1.80 M3
selasar = 3.00 x 0.90 x 1.00 x 6.00 = 16.20 M3
20.70 M3
II PEKERJAAN PONDASI
1 BATU KOSONG VOL. = P x L x T x JMH 0.90 M3
memanjang 3.00 = 3.00 x 0.90 x 0.20 x 1.00 = 0.54 M3
melintang 2.00 = 2.00 x 0.90 x 0.20 x 1.00 = 0.36 M3
selasar = 3.00 x 0.90 x 0.20 x 6.00 = 3.24 M3
0.90 M3
II BETON DAK
1 BALOK 15/20 VOL. = P x L x T x JMH 0.24 M3
memanjang = 2.00 x 0.15 x 0.20 x 2.00 = 0.12 M3
melintang = 2.00 x 0.15 x 0.20 x 2.00 = 0.12 M3
0.24 M3
IV PEKERJAAN BESI
1 ENGSEL PINTU VOL. = MASING 2 x JMH 42.00 BH
PDJ = 6.00 x 3.00 = 18.00 BH
P1 = 3.00 x 2.00 = 6.00 BH
Pw = 3.00 x 6.00 = 18.00 BH
42.00 BH
B
Lbg kusen = L x T x JMH
J3 = 1.96 x 1.52 x 18.00 = 53.63 M2
V = 1.32 x 0.48 x 11.00 = 6.97 M2
p1 = 0.88 x 2.48 x 2.00 = 4.36 M2
Pw = 0.78 x 2.04 x 6.00 = 9.55 M2
PJ1 = 1.38 x 2.48 x 3.00 = 10.27 M2
= 1.28 x 1.52 x 3.00 = 5.84 M2
B 90.61 M2
VOL.AKHIR = A - B
= 520.80 - 90.61 = 430.19 M2
B
Lbg kusen = L x T x JMH
J3 = 1.96 x 1.52 x 18.00 = 53.63 M2
V = 1.32 x 0.48 x 11.00 = 6.97 M2
p1 = 0.88 x 2.48 x 2.00 = 4.36 M2
PJ1 = 1.38 x 2.48 x 3.00 = 10.27 M2
= 1.28 x 1.52 x 3.00 = 5.84 M2
B 81.06 M2
VOL.AKHIR = A - B
= 511.13 - 81.06 = 430.07 M2
I PEKERJAAN ATAP
1 ATAP GENTENG VOL. = P x L x SISI 467.25 M2
TRAVESIUM (36+44,5)/2 = 40.25 x 5.25 x 2.00 = 422.63 M2
SEGITIGA 1 = 8.50 x 5.25 x 1.00 = 44.63 M2
467.25 M2
C DINDING TEAKBLOK
KEB. TEAKBLOK VOL. = P x L x JMH 3.10 M2
Meja Meja = 1.00 x 0.43 x 1.00 = 0.43 M2 1.07 Lbr
bok bawah = 0.90 x 0.20 x 2.00 = 0.36 M2
= 0.25 x 0.20 x 2.00 = 0.10 M2
Tiang = 1.00 x 0.20 x 2.00 = 0.40 M2
Bok atas ambang = 1.00 x 0.43 x 1.00 = 0.43 M2
bok = 0.90 x 0.50 x 2.00 = 0.90 M2
= 0.90 x 0.25 x 1.00 = 0.23 M2
= 0.25 x 0.50 x 2.00 = 0.25 M2
3.10 M2
I LUAS BANGUNAN
1 LUAS BANGUNAN VOL. = P x L x JMH 113.16 M2
DALAM = 16.40 x 6.90 x 1.00 = 113.16 M2 113.16
113.16 M2 113.16
II PEKERJAAN TANAH
1 PASIR URUG PERATAAN LANTAI VOL. = LUAS x T 6.79 M3
= 113.16 x 0.06 = 6.79 M3
6.79 M3
IV PEKERJAAN BETON
1 KOLOM 10/10 VOL. = T x JMH 129.80 M1
1 = 5.00 x 18.00 = 90.00 M1
2 = 1.50 x 2.00 = 3.00 M1
3 = 3.50 x 4.00 = 14.00 M1
4 = 4.56 x 5.00 = 22.80 M1
129.80 M1
IV BETON RINGBALK +
1 BALOK BETON 10/20 VOL. = P x L x T x JMH 1.82 M3
memanjang 16.50 = 16.50 x 0.10 x 0.20 x 2.00 = 0.66 M3 33.00
11.50 = 11.50 x 0.10 x 0.20 x 1.00 = 0.23 M3 11.50
3.00 = 3.00 x 0.10 x 0.20 x 2.00 = 0.12 M3 6.00
melintang 7.00 = 7.00 x 0.10 x 0.20 x 3.00 = 0.42 M3 21.00
3.00 = 3.00 x 0.10 x 0.20 x 2.00 = 0.12 M3 6.00
4.00 = 4.00 x 0.10 x 0.20 x 1.00 = 0.08 M3 4.00
ditangga 4.85 = 4.85 x 0.10 x 0.20 x 2.00 = 0.19 M3 9.70
1.82 M3 91.20
V PEKERJAAN PASANGAN/PLEST.
1 Trasram Bata 1/2 bt VOL. = P x T x SISI 15.84 M2
memanjang 3.00 = 2.75 x 0.20 x 4.00 = 2.20 M2
3.00 = 3.00 x 0.20 x 1.00 = 0.60 M2
4.00 = 3.75 x 0.20 x 4.00 = 3.00 M2
2.50 = 2.25 x 0.20 x 1.00 = 0.45 M2
11.50 = 10.50 x 0.20 x 1.00 = 2.10 M2
Diatas plat dak 10.50 = 10.50 x 0.20 x 1.00 = 2.10 M2
melintang 7.00 = 6.75 x 0.20 x 3.00 = 4.05 M2
3.00 = 3.00 x 0.20 x 1.00 = 0.60 M2
3.00 = 2.00 x 0.20 x 1.00 = 0.40 M2
0.85 = 0.85 x 0.20 x 2.00 = 0.34 M2
15.84 M2
2 Dinding Bata 1/2 bt - T.500 M VOL. = P x T x JMH 351.27 M2
memanjang 3.00 = 2.75 x 4.70 x 4.00 = 51.70 M2
3.00 = 3.00 x 4.70 x 1.00 = 14.10 M2
4.00 = 3.75 x 4.70 x 4.00 = 70.50 M2
2.50 = 2.25 x 4.70 x 2.00 = 21.15 M2
11.50 = 11.25 x 4.70 x 1.00 = 52.88 M2
ralling 1.50 = 1.50 x 1.00 x 1.00 = 1.50 M2
depan - diatas dak beton 10.50 = 10.50 x 4.16 x 1.00 = 43.68 M2
melintang 7.00 = 6.75 x 4.70 x 2.00 = 63.45 M2
7.00 = 7.00 x 4.70 x 1.00 = 32.90 M2
3.00 = 3.00 x 4.70 x 2.00 = 28.20 M2
4.00 = 4.00 x 4.70 x 1.00 = 18.80 M2
depan - diatas dak beton 0.74 = 0.74 x 4.16 x 2.00 = 6.16 M2
di Shaf 2.45 = 2.45 x 2.00 x 1.00 = 4.90 M2
A 409.91 M2
B
lobang kusen = L x T x JMH
J2A 142X142 = 1.42 x 1.42 x 2.00 = 4.03 M2
J2B 142X162 = 1.42 x 1.62 x 1.00 = 2.30 M2
J2C 152X152 = 1.52 x 1.52 x 2.00 = 4.62 M2
J3 226X152 = 2.26 x 1.52 x 2.00 = 6.87 M2
J 112X239 = 1.12 x 2.39 x 2.00 = 5.35 M2
V1 68X48 = 0.68 x 0.48 x 3.00 = 0.98 M2
V2 142X48 = 1.42 x 0.48 x 1.00 = 0.68 M2
P1 88x253 = 0.88 x 2.53 x 1.00 = 2.23 M2
Pd1 138x253 = 1.38 x 2.53 x 1.00 = 3.49 M2
Pd2 148x253 = 1.48 x 2.53 x 1.00 = 3.74 M2
Pw 78x209 = 0.78 x 2.09 x 2.00 = 3.26 M2
B.ksng 80x209 = 0.80 x 2.09 x 2.00 = 3.34 M2
225x209 = 2.25 x 2.09 x 1.00 = 4.70 M2
B.ksng- depan dak 275x180 = 2.62 x 1.80 x 2.00 = 9.43 M2
63x180 = 0.50 x 1.80 x 4.00 = 3.60 M2
B 58.64 M2
VOL.AKHIR = A - B
= 409.91 - 58.64 = 351.27 M2
IX PEKERJAAN BESI
1 ENGSEL PINTU VOL. = MASING 2 x JMH 12.00 BH
P1 = 3.00 x 1.00 = 3.00 BH
PJ = 3.00 x 1.00 = 3.00 BH
PU = 6.00 x 1.00 = 6.00 BH
12.00 BH
B
Lbg kusen = L x T x JMH
PD1 = 1.38 x 2.53 x 2.00 = 6.98 M2
PD2 = 1.48 x 2.53 x 2.00 = 7.49 M2
P1 = 0.88 x 2.53 x 2.00 = 4.45 M2
PW = 0.78 x 2.09 x 2.00 = 3.26 M2
J2A = 1.42 x 1.42 x 2.00 = 4.03 M2
J2B = 1.42 x 1.62 x 1.00 = 2.30 M2
J2C = 1.52 x 1.52 x 2.00 = 4.62 M2
J3 = 2.26 x 1.52 x 2.00 = 6.87 M2
J = 1.12 x 2.39 x 2.00 = 5.35 M2
V1 = 0.68 x 0.48 x 3.00 = 0.98 M2
V2 = 1.42 x 0.48 x 1.00 = 0.68 M2
Blk kosong - 1 = 0.80 x 2.10 x 4.00 = 6.72 M2
Blk kosong - 2 = 2.25 x 2.10 x 1.00 = 4.73 M2
B 58.47 M2
VOL.AKHIR = A - B
= 322.72 - 58.47 = 264.25 M2
3 CAT DINDING (Luar) - BARU VOL. = P x T x JMH 314.67 M2
A samping = 7.25 x 4.50 x 1.00 = 32.63 M2
= 8.45 x 4.50 x 1.00 = 38.03 M2
belakang = 16.75 x 4.50 x 1.00 = 75.38 M2
depan = 16.75 x 4.50 x 1.00 = 75.38 M2
= 23.96 x 4.16 x 1.00 = 99.67 M2
keramik dinding = 37.52 = 37.52 M2
A 358.59 M2
B
Lbg kusen = L x T x JMH
J2a = 1.42 x 1.42 x 2.00 = 4.03 M2
J2b = 1.42 x 1.62 x 1.00 = 2.30 M2
J2c = 1.52 x 1.52 x 2.00 = 4.62 M2
J3 = 2.26 x 1.52 x 2.00 = 6.87 M2
J = 1.12 x 2.39 x 2.00 = 5.35 M2
V1 = 0.68 x 0.48 x 3.00 = 0.98 M2
V2 = 1.42 x 0.48 x 1.00 = 0.68 M2
blk kosong = 2.65 x 1.80 x 4.00 = 19.08 M2
B 43.92 M2
VOL.AKHIR = A - B
= 358.59 - 43.92 = 314.67 M2
XI PEKERJAAN ATAP
1 ATAP GENTENG - INDUK VOL. = P x L x SISI 218.50 M2
TRAVES. 1 = 14.25 x 5.75 x 2.00 = 163.88 M2
segitiga 2 = 9.50 x 5.75 x 2.00 x 0.50 = 54.63 M2
218.50 M2
I LUAS BANGUNAN
1 LUAS BANGUNAN VOL. = P x L x JMH 76.00 M2
DALAM = 8.00 x 4.00 x 1.00 = 32.00 M2 32.00
= 4.00 x 8.00 x 1.00 = 32.00 M2 32.00
SELASAR = 8.00 x 2.00 x 0.50 = 8.00 M2 16.00
= 4.00 x 2.00 x 0.50 = 4.00 M2 8.00
76.00 M2 88.00
II PEKERJAAN TANAH
1 GALIAN PONDASI VOL. = P x L x T x JMH 94.93 M3
Pondasi stempat 125x125 cm = 1.45 x 1.45 x 1.50 x 6.00 = 18.92 M3
Pondasi stempat 175x175 cm = 1.95 x 1.95 x 1.50 x 12.00 = 68.45 M3
Galian sloof 25/40 = 7.00 x 0.40 x 0.50 x 4.00 = 5.60 M3
Galian pondasi bt.kali shaf = 2.45 x 0.80 x 1.00 x 1.00 = 1.96 M3
94.93 M3
IV PEKERJAAN BETON
1 BETON RABAT BWH LANTAI VOL. = P x L x T x JMH 1.51 M3
= 10.50 x 3.00 x 0.05 x 1.00 = 1.51 M3
1.51 M3
Ø10mm - 12,5 = 0.617 x 1.95 x 10.00 x 6.00 x 2.00 = 144.26 Kg 55.96 KG/M3
4 FOOTPLAT 175X175 CM VOL. = P x L x T x JMH 11.03 M3
= 1.75 x 1.75 x 0.30 x 12.00 = 11.03 M3
11.03 M3
Ø10mm - 12,5 = 0.617 x 2.45 x 14.00 x 12.00 x 2.00 = 507.50 Kg 46.03 KG/M3
IV BETON LANTAI 2
1 BALOK BETON 25/60 VOL. = P x L x T x JMH 5.94 M3
melintang 7.00 = 6.60 x 0.25 x 0.60 x 6.00 = 5.94 M3
5.94 M3
VOL.AKHIR = 2 + 2A
= 0.66 + 1.17 = 1.83 M3
Ø10mm - 12,5 = 0.617 x 1.70 x 11.00 x 1.00 x 1.00 = 11.53 Kg 61.52 KG/M3
= 0.617 x 1.95 x 8.00 x 1.00 x 1.00 = 9.62 Kg
21.15 Kg
V PEKERJAAN PASANGAN/PLEST.
2 Trasram Bata 1/2 bt VOL. = P x T x SISI 46.71 M2
memanjang 3.00 = 2.75 x 0.40 x 4.00 = 4.40 M2
3.50 = 3.25 x 0.40 x 7.00 = 9.10 M2
1.00 = 1.00 x 0.40 x 1.00 = 0.40 M2
Trap tangga 10.50 = 10.50 x 0.50 x 2.00 = 10.50 M2
Shaf 2.45 = 2.45 x 0.50 x 1.00 = 1.23 M2
melintang 4.00 = 4.00 x 0.40 x 2.00 = 3.20 M2
3.00 = 3.00 x 0.40 x 5.00 = 6.00 M2
7.00 = 6.60 x 0.40 x 1.00 = 2.64 M2
anak tangga = 0.04 x 22.00 x 10.00 = 9.24 M2
46.71 M2
2 Dinding Bata 1/2 bt - T.400 M VOL. = P x T x JMH 307.28 M2
2.1 memanjang 3.00 = 2.75 x 3.70 x 4.00 = 40.70 M2
3.50 = 3.25 x 3.70 x 3.00 = 36.08 M2
1.00 = 1.00 x 4.00 x 1.00 = 4.00 M2
7.00 = 7.00 x 3.88 x 2.00 = 54.32 M2
Shaf 2.45 = 2.45 x 3.80 x 1.00 = 9.31 M2
Bordes tangga 3.50 = 3.50 x 3.00 x 1.00 = 10.50 M2
melintang 7.00 = 6.60 x 3.50 x 1.00 = 23.10 M2
4.00 = 4.00 x 3.50 x 2.00 = 28.00 M2
3.00 = 3.00 x 3.88 x 2.00 = 23.28 M2
3.00 = 3.00 x 3.50 x 2.00 = 21.00 M2
3.00 = 3.00 x 3.20 x 2.00 = 19.20 M2
di tangga 4.85 = 4.85 x 3.65 x 2.00 = 35.41 M2
= 3.35 x 2.00 x 0.50 x 2.00 = 6.70 M2
Ralling tangga 8.00 = 8.00 x 0.80 x 1.00 = 6.40 M2
2.2 DINDING BANG. LAMA Kesmas = 3.35 x 3.30 x 2.00 = 22.11 M2
R.kosong = 2.00 x 3.30 x 1.00 = 6.60 M2
A 346.70 M2
B
lobang kusen = L x T x JMH
J2 R.BPU = 1.32 x 1.62 x 1.00 = 2.14 M2
J1 R.Mtba = 1.12 x 2.95 x 2.00 = 6.61 M2
J1-rolling Loket = 1.00 x 0.85 x 2.00 = 1.70 M2
J1-Teras Teras = 1.27 x 2.20 x 2.00 = 5.59 M2
P1 = 0.88 x 2.53 x 4.00 = 8.91 M2
PJ = 0.88 x 2.53 x 2.00 = 4.45 M2
= 1.68 x 1.62 x 2.00 = 5.44 M2
Ps = 0.68 x 1.58 x 1.00 = 1.07 M2
PU = 1.68 x 2.09 x 1.00 = 3.51 M2
B 39.42 M2
VOL.AKHIR = A - B
= 346.70 - 39.42 = 307.28 M2
IX PEKERJAAN BESI
1 ENGSEL PINTU VOL. = MASING 2 x JMH 24.00 BH
P1 = 3.00 x 4.00 = 12.00 BH
PJ = 3.00 x 2.00 = 6.00 BH
PU = 6.00 x 1.00 = 6.00 BH
24.00 BH
B
Lbg kusen = L x T x JMH
PU = 1.68 x 2.09 x 1.00 = 3.51 M2
P1 = 0.88 x 2.53 x 6.00 = 13.36 M2
pd = 1.68 x 2.09 x 1.00 = 3.51 M2
PJ = 0.88 x 2.53 x 4.00 = 8.91 M2
= 1.73 x 1.62 x 4.00 = 11.21 M2
J2 = 1.42 x 1.62 x 1.00 = 2.30 M2
J2A = 1.12 x 2.95 x 2.00 = 6.61 M2
J.ROLLING = 1.00 x 0.85 x 4.00 = 3.40 M2
J.TERAS = 1.27 x 2.20 x 2.00 = 5.59 M2
keramik dinding = 157.12 = 157.12 M2
B 215.51 M2
VOL.AKHIR = A - B
= 518.17 - 215.51 = 302.66 M2
3 CAT DINDING (Luar) - BARU VOL. = P x T x JMH 93.01 M2
A samping = 11.30 x 4.40 x 1.00 = 49.72 M2
= 3.00 x 4.40 x 1.00 = 13.20 M2
depan = 3.00 x 4.40 x 2.00 = 26.40 M2
= 10.50 x 0.40 x 1.00 = 4.20 M2
kolom = 1.00 x 3.20 x 2.00 = 6.40 M2
Lisplank = 20.50 x 1.00 x 1.00 = 20.50 M2
sunscren = 7.20 x 0.68 x 2.00 = 9.79 M2
A 130.21 M2
B
Lbg kusen = L x T x JMH
J2 = 1.42 x 1.62 x 1.00 = 2.30 M2
J2A = 1.12 x 2.95 x 2.00 = 6.61 M2
J - Teras = 1.27 x 2.20 x 2.00 = 5.59 M2
keramik dinding = 22.70 = 22.70 M2
B 37.20 M2
VOL.AKHIR = A - B
= 130.21 - 37.20 = 93.01 M2
C DINDING TEAKBLOK
KEB. TEAKBLOK VOL. = P x L x JMH 3.10 M2
Meja Meja = 1.00 x 0.43 x 1.00 = 0.43 M2 1.07 Lbr
bok bawah = 0.90 x 0.20 x 2.00 = 0.36 M2
= 0.25 x 0.20 x 2.00 = 0.10 M2
Tiang = 1.00 x 0.20 x 2.00 = 0.40 M2
Bok atas ambang = 1.00 x 0.43 x 1.00 = 0.43 M2
bok = 0.90 x 0.50 x 2.00 = 0.90 M2
= 0.90 x 0.25 x 1.00 = 0.23 M2
= 0.25 x 0.50 x 2.00 = 0.25 M2
3.10 M2
I PEKERJAAN BONGKAR
1 BONGKAR ATAP GENTENG VOL. = P x L x SISI 370.01 M2
Depan Traves. 1 = 14.30 x 4.33 x 1.00 = 61.92 M2
Traves. 2 = 8.05 x 4.33 x 1.00 = 34.86 M2
Samping kiri Traves. 3 = 18.65 x 2.94 x 1.00 = 54.83 M2
Traves. 4 = 13.05 x 4.33 x 1.00 = 56.51 M2
Samping kanan Traves. 5 = 8.55 x 2.94 x 1.00 = 25.14 M2
ketupat = 6.00 x 4.33 x 1.00 = 25.98 M2
Segitiga = 5.10 x 2.94 x 0.50 = 7.50 M2
Belakang Traves. 6 = 15.20 x 2.94 x 1.00 = 44.69 M2
ketupat = 11.80 x 4.33 x 1.00 = 51.09 M2
Segitiga = 5.10 x 2.94 x 0.50 = 7.50 M2
370.01 M2
Batas sampai Lorong
2 BONGKAR KUSEN/DINDING VOL. = P x L x SISI 60.31 M2
Kusen P1 = 0.90 x 2.50 x 8.00 = 18.00 M2
JF1 = 0.80 x 1.65 x 3.00 = 3.96 M2
JF2 = 1.55 x 1.65 x 7.00 = 17.90 M2
Dinding kedudukan Kusen baru P1 = 0.90 x 1.00 x 8.00 = 7.20 M2
JF1 = 0.80 x 1.00 x 3.00 = 2.40 M2
JF2 = 1.55 x 1.00 x 7.00 = 10.85 M2
60.31 M2
I PEKERJAAN PASANGAN/PLEST.
1 Trasram Bata 1/2 bt VOL. = P x L x SISI 7.86 M2
Peninggian dinding bata 20cm
1.50 = 1.50 x 0.30 x 2.00 = 0.90 M2
6.00 = 6.00 x 0.30 x 1.00 = 1.80 M2
14.20 = 14.20 x 0.30 x 1.00 = 4.26 M2
1.50 = 1.50 x 0.30 x 2.00 = 0.90 M2
7.86 M2
IV PEKERJAAN PLAFOND
1 PLAFOND KALSIBOARD - DALAM VOL. = P x L x JMH 75.92 M2
DALAM RUANG R.Gizi = 3.00 x 3.30 x 1.00 = 9.90 M2
R.Promkes = 3.00 x 3.40 x 1.00 = 10.20 M2
R.Obat = 4.10 x 3.10 x 1.00 = 12.71 M2
R.Apotik = 2.00 x 3.10 x 1.00 = 6.20 M2
R.Loket = 2.00 x 3.10 x 1.00 = 6.20 M2
Poli umum = 4.10 x 3.10 x 1.00 = 12.71 M2
Laboratorium = 3.00 x 3.90 x 1.00 = 11.70 M2
R.Sample = 3.00 x 2.10 x 1.00 = 6.30 M2
75.92 M2
IV PEKERJAAN BESI
1 ENGSEL PINTU VOL. = MASING 2 x JMH 24.00 BH
P1 = 3.00 x 8.00 = 24.00 BH
24.00 BH
V PEKERJAAN PENGECATAN
1 POLITURAN DAUN PINTU VOL. = L x T x SISI x JMH 25.60 M2
KP1 pintu = 0.80 x 2.00 x 2.00 x 8.00 = 25.60 M2
B
Lbg kusen = L x T x JMH
P1 = 0.88 x 0.98 x 8.00 = 6.90 M2
J1 = 0.68 x 0.50 x 4.00 = 1.36 M2
J2 = 1.32 x 0.50 x 7.00 = 4.62 M2
B 12.88 M2
VOL.AKHIR = A - B
= 171.15 - 12.88 = 158.27 M2
I PEKERJAAN TANAH
1 GALIAN PONDASI SETEMPAT VOL. = P x L x T x JMH 162.84 M3
1.1 Pondasi 250x250 = 2.70 x 2.70 x 2.20 x 4.00 = 64.15 M3
1.2 Pondasi 200x200 = 2.20 x 2.20 x 2.20 x 2.00 = 21.30 M3
1.3 Pondasi 175x175 = 1.95 x 1.95 x 2.20 x 4.00 = 33.46 M3
1.4 Pondasi 150x150 = 1.70 x 1.70 x 2.20 x 4.00 = 25.43 M3
1.5 Pondasi 125x125 = 1.45 x 1.45 x 2.20 x 4.00 = 18.50 M3
162.84 M3
Pembesian D16 - 125 = 1.58 x 2.50 x 21.00 x 4.00 x 2.00 = 662.86 KG 88.38 KG/M3
Pembesian D16 - 125 = 1.58 x 2.00 x 17.00 x 2.00 x 2.00 = 214.64 KG 89.43 KG/M3
Pembesian D13 - 15 = 1.04 x 1.75 x 15.00 x 4.00 x 2.00 = 218.80 KG 59.54 KG/M3
Pembesian D13 - 15 = 1.04 x 1.50 x 13.00 x 4.00 x 2.00 = 162.53 KG 60.20 KG/M3
Pembesian D13 - 15 = 1.04 x 1.25 x 11.00 x 4.00 x 2.00 = 114.61 KG 61.12 KG/M3
IV PEK. PASANGAN/PLESTERAN
1 PAS. TRASRAM BATA 1/2 BT. VOL. = P x L x JMH 125.48 M2
Memanjang 3.00 = 2.75 x 0.50 x 12.00 = 16.50 M2
3.00 = 3.00 x 0.50 x 5.00 = 7.50 M2
1.75 = 1.50 x 0.50 x 6.00 = 4.50 M2
1.75 = 1.75 x 0.50 x 1.00 = 0.88 M2
trap tangga 1.75 = 1.75 x 0.80 x 10.00 = 14.00 M2
4.50 = 4.50 x 0.50 x 2.00 = 4.50 M2
5.00 = 4.70 x 0.50 x 3.00 = 7.05 M2
11.00 = 11.00 x 0.50 x 1.00 = 5.50 M2
blkng = 6.00 x 0.50 x 1.00 = 3.00 M2
Melintang 6.40 = 6.40 x 0.50 x 2.00 = 6.40 M2
4.00 = 4.00 x 0.50 x 4.00 = 8.00 M2
4.50 = 4.50 x 0.50 x 1.00 = 2.25 M2
4.10 = 4.10 x 0.50 x 3.00 = 6.15 M2
3.00 = 3.00 x 0.50 x 2.00 = 3.00 M2
1.50 = 1.50 x 0.50 x 2.00 = 1.50 M2
1.10 = 1.10 x 0.50 x 1.00 = 0.55 M2
6.00 = 6.00 x 0.50 x 2.00 = 6.00 M2
Tangga samp. 1.50 = 1.50 x 0.50 x 2.00 = 1.50 M2
Teras Blkng Trap = 1.20 x 0.50 x 10.00 = 6.00 M2
anak tangga = 1.50 x 0.03 x 20.00 x 10.00 = 9.00 M2
Ram teras = 3.00 x 1.20 x 2.00 = 7.20 M2
= 4.50 x 0.50 x 2.00 = 4.50 M2
125.48 M3
2 PAS. DINDING BATA 1/2 BT. VOL. = P x L x JMH 499.75 M2
Memanjang
Antar kolom 3.00 = 2.75 x 3.70 x 12.00 = 122.10 M2
3.00 = 3.00 x 3.88 x 5.00 = 58.20 M2
1.75 = 1.50 x 3.70 x 6.00 = 33.30 M2
1.75 = 1.75 x 3.88 x 1.00 = 6.79 M2
4.50 = 4.50 x 3.80 x 1.00 = 17.10 M2
4.50 = 4.50 x 3.88 x 1.00 = 17.46 M2
5.00 = 4.70 x 3.70 x 1.00 = 17.39 M2
5.00 = 4.70 x 0.60 x 2.00 = 5.64 M2
11.00 = 10.75 x 3.70 x 1.00 = 39.78 M2
Melintang 6.40 = 6.15 x 3.70 x 2.00 = 45.51 M2
4.00 = 3.75 x 3.70 x 4.00 = 55.50 M2
4.50 = 4.50 x 3.80 x 1.00 = 17.10 M2
4.10 = 3.85 x 3.70 x 3.00 = 42.74 M2
3.00 = 3.00 x 3.70 x 2.00 = 22.20 M2
1.50 = 1.50 x 3.88 x 2.00 = 11.64 M2
1.10 = 1.10 x 3.70 x 1.00 = 4.07 M2
7.00 = 7.00 x 3.70 x 2.00 = 51.80 M2
blk gtg = 6.00 x 0.60 x 2.00 = 7.20 M2
ralling tangga 8.00 = 8.00 x 0.80 x 1.00 = 6.40 M2
selimut pilar teras bawah = 0.37 x 4.00 = 1.48 M2
pilar bata = 4.00 x 0.90 x 4.00 = 14.40 M2
A 597.79 M2
B
Lbg kusen = L x T x JMH
Pu = 4.60 x 2.75 x 1.00 = 12.65 M2
P1 / PD = 1.50 x 2.60 x 3.00 = 11.70 M2
P2 = 0.90 x 2.60 x 4.00 = 9.36 M2
Pw = 0.80 x 2.05 x 5.00 = 8.20 M2
blk gntng = 1.00 x 2.20 x 3.00 = 6.60 M2
J1 = 0.70 x 1.60 x 2.00 = 2.24 M2
J2 = 1.35 x 1.60 x 12.00 = 25.92 M2
J3 = 2.68 x 3.10 x 2.00 = 16.62 M2
V1 = 0.80 x 0.50 x 8.00 = 3.20 M2
V2 = 1.55 x 0.50 x 2.00 = 1.55 M2
B 98.04 M2
VOL.AKHIR = A - B
= 597.79 - 98.04 = 499.75 M2
VOL.AKHIR = A - B
= 361.75 - 21.50 = 340.25 M2
2 LANTAI KERAMIK KM/WC VOL. = P x L x JMH 21.50 M2
= 1.75 x 2.00 x 1.00 = 3.50 M2
= 3.00 x 3.00 x 2.00 = 18.00 M2
21.50 M2
VI PEKERJAAN PLAFOND
1 PLAFOND KALSIBOARD VOL. = P x L x JMH 328.90 M2
(Dalam) = 11.00 x 7.00 x 1.00 = 77.00 M2
= 23.00 x 10.50 x 1.00 - 12.00 = 229.50 M2
= 1.75 x 6.40 x 2.00 = 22.40 M2
328.90 M2
IX PEKERJAAN PARTISI
1 PARTISI RANGKA KAYU VOL. = P x T x JMH 58.19 M2
Dilapis double teakwoood PR 1 = 2.09 x 2.11 x 3.00 = 13.23 M2
PR2 = 2.19 x 2.11 x 1.00 = 4.62 M2
PR3 = 4.67 x 2.11 x 3.00 = 29.56 M2
= 2.72 x 0.88 x 1.00 = 2.39 M2
PR5 = 1.97 x 2.11 x 1.00 = 4.16 M2
= 1.49 x 2.11 x 1.00 = 3.14 M2
PR6 = 1.23 x 0.88 x 1.00 = 1.08 M2
58.19 M2
IX PEKERJAAN ATAP
1 ATAP GENTENG VOL. = P x L x SISI 412.72 M2
Lumbung depan = 7.07 x 5.75 x 2.00 = 81.25 M2
Ks 1 = 5.58 x 1.90 x 1.00 = 10.59 M2
Ks 2 = 5.00 x 1.90 x 2.00 = 19.00 M2
Samping traves. = 8.95 x 5.50 x 2.00 = 98.45 M2
segitiga = 4.25 x 5.50 x 4.00 x 0.50 = 46.75 M2
Belakang Ks = 1.75 x 1.90 x 2.00 = 6.65 M2
traves. = 5.45 x 8.50 x 2.00 = 92.65 M2
segitiga = 13.50 x 8.50 x 1.00 x 0.50 = 57.38 M2
412.72 M2
REKAPITULASI
1 KUDA-KUDA BAJ WF 3,508.44 KG
KD-KD LUMBUNG = 307.44 = 307.44 KG
KD-KD SAMPING = 361.20 = 361.20 KG
JURAI SAMPING = 422.80 = 422.80 KG
TRAVESIUM BELAKANG = 383.40 = 383.40 KG
1/4 KD-KD BELAKANG = 251.34 = 251.34 KG
JURAI BELAKANG = 492.03 = 492.03 KG
1/2 KD-KD BELAKANG = 257.73 = 257.73 KG
KONSOL KELILING = 1,032.50 = 1,032.50 KG
3,508.44 KG
3 BAUTMUR 270.00 BH
KD-KD LUMBUNG = 20.00 = 20.00 BH
KD-KD SAMPING = 20.00 = 20.00 BH
JURAI SAMPING = 80.00 = 80.00 BH
TRAVESIUM BELAKANG = 20.00 = 20.00 BH
1/4 KD-KD BELAKANG = 10.00 = 10.00 BH
JURAI BELAKANG = 80.00 = 80.00 BH
1/2 KD-KD BELAKANG = 40.00 = 40.00 BH
KONSOL KELILING = - = - BH
270.00 BH
4 PLAT BAJA LUAS x berat x JMH 278.04 KG
KD-KD LUMBUNG plat tump. = 0.30 x 39.25 x 2.00 = 23.55 KG
plent gording = 0.11 x 39.25 x 2.00 = 8.83 KG
KD-KD SAMPING plat tump. = 0.30 x 39.25 x 4.00 = 47.10 KG
plent gording = 0.06 x 39.25 x 4.00 = 8.83 KG
JURAI SAMPING plat tump. = 0.30 x 39.25 x 4.00 = 47.10 KG
plent gording = 0.06 x 39.25 x 4.00 = 8.83 KG
plat samb. = 0.20 x 39.25 x 4.00 = 31.40 KG
TRAVESIUM BELAKANG plat tump. = 0.30 x 39.25 x 1.00 = 11.78 KG
plent gording = 0.11 x 39.25 x 1.00 = 4.42 KG
1/4 KD-KD BELAKANG plat tump. = 0.30 x 39.25 x 1.00 = 11.78 KG
plent gording = 0.05 x 39.25 x 1.00 = 1.77 KG
JURAI BELAKANG plat tump. = 0.30 x 39.25 x 2.00 = 23.55 KG
plent gording = 0.09 x 39.25 x 2.00 = 7.07 KG
plat samb. = 0.20 x 39.25 x 1.00 = 7.85 KG
1/2 KD-KD BELAKANG plat tump. = 0.30 x 39.25 x 1.00 = 11.78 KG
plent gording = 0.09 x 39.25 x 1.00 = 3.53 KG
plat samb. = 0.20 x 39.25 x 1.00 = 7.85 KG
KONSOL KELILING plent gording = 0.01 x 39.25 x 25.00 = 11.04 KG
278.04 KG
X PEKERJAAN PENGECATAN
1 CAT KUSEN/JENDELA VOL. = P x Kllg x JMH 116.49 M2
A Kusen pintu jendela
Pw kusen = 4.70 x 0.23 x 5.00 = 5.41 M2
KP1 kusen = 5.80 x 0.23 x 7.00 = 9.34 M2
= 0.80 x 0.36 x 7.00 = 2.02 M2
KP2 kusen = 6.30 x 0.23 x 3.00 = 4.35 M2
= 1.70 x 0.36 x 3.00 = 1.84 M2
jendela = 3.96 x 0.22 x 3.00 = 2.61 M2
KJ1 kusen = 4.40 x 0.23 x 3.00 = 3.04 M2
= 0.60 x 0.36 x 3.00 = 0.65 M2
jendela = 4.30 x 0.22 x 3.00 = 2.84 M2
ventilasi = 2.60 x 0.22 x 3.00 = 1.72 M2
KJ2 kusen = 5.70 x 0.23 x 8.00 = 10.49 M2
= 2.65 x 0.36 x 8.00 = 7.63 M2
jendela = 4.30 x 0.22 x 16.00 = 15.14 M2
ventilasi = 2.60 x 0.22 x 16.00 = 9.15 M2
V1 kusen = 2.40 x 0.23 x 8.00 = 4.42 M2
V2 kusen = 3.90 x 0.23 x 2.00 = 1.79 M2
= 0.40 x 0.36 x 2.00 = 0.29 M2
ventilasi = 2.80 x 0.22 x 4.00 = 2.46 M2
B Kusen Partisi -
PR1 kusen = 8.28 x 0.23 x 3.00 = 5.71 M2
= 3.30 x 0.34 x 3.00 = 3.37 M2
PR2 kusen = 7.43 x 0.23 x 1.00 = 1.71 M2
= 8.20 x 0.34 x 1.00 = 2.79 M2
PR3 kusen = 11.54 x 0.23 x 3.00 = 7.96 M2
= 3.30 x 0.34 x 3.00 = 3.37 M2
PR5 kusen = 7.84 x 0.23 x 1.00 = 1.80 M2
= 6.40 x 0.34 x 1.00 = 2.18 M2
PR6 kusen = 7.32 x 0.23 x 1.00 = 1.68 M2
= 2.23 x 0.34 x 1.00 = 0.76 M2
116.49 M2
B
Lbg kusen = L x T x JMH
PU = 4.60 x 2.75 x 1.00 = 12.65 M2
P1/Pd = 1.50 x 2.60 x 3.00 = 11.70 M2
J1 = 0.70 x 1.60 x 2.00 = 2.24 M2
J2 = 1.35 x 1.60 x 12.00 = 25.92 M2
J3 = 2.68 x 3.10 x 2.00 = 16.62 M2
V1 = 0.80 x 0.50 x 8.00 = 3.20 M2
V2 = 1.55 x 0.50 x 2.00 = 1.55 M2
B 73.88 M2
VOL.AKHIR = A - B
= 632.35 - 73.88 = 558.47 M2
B
Lbg kusen = L x T x JMH
PU = 4.60 x 2.75 x 1.00 = 12.65 M2
P1/Pd = 1.50 x 2.60 x 3.00 = 11.70 M2
P2 = 0.90 x 2.60 x 12.00 = 28.08 M2
Pw = 0.80 x 2.15 x 5.00 = 8.60 M2
J1 = 0.70 x 1.60 x 2.00 = 2.24 M2
J2 = 1.35 x 1.60 x 12.00 = 25.92 M2
J3 = 2.68 x 3.10 x 2.00 = 16.62 M2
V1 = 0.80 x 0.50 x 8.00 = 3.20 M2
V2 = 1.55 x 0.50 x 2.00 = 1.55 M2
B 110.56 M2
VOL.AKHIR = A - B
= 672.24 - 110.56 = 561.68 M2
A Bangunan Sanitasi
I. PEKERJAAN PERSIAPAN
1 Papan nama proyek 1.000 Unit Ls 200,000.00 200,000.00
2 Uitzet/Pengukuran/Pas. Bouwplank 5.000 m' A.2.2.1.4 94,200.00 471,000.00
3 Pembersihan awal dan akhir proyek 1.000 unit Ls 500,000.00 500,000.00
JUMLAH ( I ) 1,171,000.00
II. PEKERJAAN TANAH
1 Galian pondasi 6.720 m³ A.2.3.1.1 49,125.00 330,120.00
2 Urugan tanah kembali 1.680 m³ A.2.3.1.9 16,375.00 27,510.00
3 Pasir urug dibawah pondasi 1.480 m³ A.2.3.1.11 139,650.00 206,682.00
4 Tanah urug dibawah lantai 3.247 m³ A.2.3.1.11a 94,650.00 307,319.09
JUMLAH ( II ) 871,631.09
III. PEKERJAAN BETON
1 Pek. beton bertulang sloof 15/20 0.740 m³ A.4.1.1.30 3,321,071.71 2,457,593.07
2 Pek. beton bertulang kolom 10/10 64.600 m' A.4.1.1.35 54,064.80 3,492,586.08
3 Pek. beton bertulang balok 10/15 - sunscreen 26.800 m' A.4.1.1.36 73,442.42 1,968,256.86
4 Pek. beton bertulang balok ring 10/15 65.890 m' A.4.1.1.36 73,442.42 4,839,121.05
4 Pek. beton bertulang plat sunscren T.8cm 0.804 m³ A.4.1.1.42 4,252,212.46 3,418,778.82
JUMLAH ( III ) 16,176,335.87
IV. PEKERJAAN ATAP
1 Pas. Kap kd-kd dan reng baja ringan (SNI) + Spandek 0,3 mm 79.900 m² Ls 265,000.00 21,173,500.00
2 Lisplank kalsiplank Jati 8mm-20cm 27.300 m¹ A.4.6.1.21c 38,300.00 1,045,590.00
JUMLAH ( III ) 22,219,090.00
V. PEKERJAAN PASANGAN / PLESTERAN
1 Pas. Pondasi batu kali camp. 1pc : 5psr 8.325 m³ A.3.2.1.3 482,170.00 4,014,065.25
2 Pas. trasram bata 1/2 bt. camp. 1pc : 3psr 21.213 m² A.4.4.1.8 82,431.40 1,748,617.29
3 Pas. dinding bata 1/2 bt. camp. 1pc : 5psr 117.530 m² A.4.4.1.10 77,334.60 9,089,135.54
4 Plesteran trasram bata camp. 1pc : 3psr 42.426 m² A.4.4.2.3 32,011.72 1,358,129.23
5 Plesteran dinding bata camp. 1pc : 5psr 155.252 m² A.4.4.2.5 29,224.48 4,537,158.97
6 Acian Pc 155.252 m² A.4.4.2.27 17,065.00 2,649,375.38
7 Pek. Pemasangan dinding roster pejaten 20x20 4.320 m² A.4.4.1.23 199,945.00 863,762.40
8 Pek. Pemasangan dinding batu andesit 14.000 m² A.4.4.3.58 224,320.00 3,140,480.00
JUMLAH ( IV ) 27,400,724.06
VI. PEKERJAAN LANTAI DAN PLAFOND
a. Pekerjaan Plafon
1 Pas. Plafond kalsiboard T. 3,5mm,rangka hollow - Dalam 24.721 m² A.4.5.1.5c 94,150.00 2,327,519.81
2 Pas. LisPlafond gypsum C7 - Dalam 48.880 m² A.4.5.1.8 19,425.00 949,494.00
b. Pekerjaan Keramik
2 Pas. Keramik lantai 30x30 km/wc 41.717 m² A.4.4.3.35 153,075.00 6,385,829.78
3 Pas. Dinding keramik 30x30cm - KM/Wc 65.808 m² A.4.4.3.35 153,075.00 10,073,559.60
JUMLAH ( V ) 19,736,403.19
VII. PEKERJAAN KUSEN,PINTU DAN KACA
1 Kusen pintu/ventilasi kayu klas II 0.135 m³ A.4.6.1.1 6,674,250.00 902,358.60
2 Daun pintu luar teakwood dlm triplek aluminium -km/wc 5.010 m² A.4.6.1.5c 280,600.00 1,405,693.76
3 Daun pintutype koboy 4.848 m² A.4.6.1.5b 272,050.00 1,318,898.40
JUMLAH ( VI ) 3,626,950.76
VIII. PEKERJAAN BESI/PENGUNCI
1 Kunci tanam - toilet 4.000 bh A.4.6.2.3 63,327.50 253,310.00
2 Engsel pintu 18.000 bh A.4.6.2.5 17,532.50 315,585.00
JUMLAH ( VII ) 568,895.00
IX. PEKERJAAN PENGECATAN/FINISHING
1 Cat dinding (Exterior) 58.216 m² A.4.7.1.10 13,550.00 788,826.80
2 Cat dinding (Interior) 113.352 m² A.4.7.1.10 13,550.00 1,535,919.60
3 Cat plafon 24.721 m² A.4.7.1.10 13,550.00 334,974.97
4 Polituran (daun pintu) 14.706 m² A.4.7.1.7 44,324.00 651,811.01
JUMLAH ( VIII ) 3,311,532.38
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6 7
1 2 3
A Bangunan Sanitasi
I. PEKERJAAN PERSIAPAN Rp. 1,171,000.00
II. PEKERJAAN TANAH Rp. 871,631.09
III. PEKERJAAN BETON Rp. 16,176,335.87
IV. PEKERJAAN ATAP Rp. 22,219,090.00
IV. PEKERJAAN PASANGAN / PLESTERAN Rp. 27,400,724.06
V. PEKERJAAN LANTAI DAN PLAFOND Rp. 19,736,403.19
VI. PEKERJAAN KUSEN,PINTU DAN KACA Rp. 3,626,950.76
VII. PEKERJAAN BESI/PENGUNCI Rp. 568,895.00
VIII. PEKERJAAN PENGECATAN/FINISHING Rp. 3,311,532.38
IX. PEKERJAAN INSTALASI LISTRIK Rp. 896,430.00
X. PEKERJAAN INST. AIR & SANITAIR Rp. 7,421,496.75
Mataram, 2018
Ketua Tim Pelaksana Dibuat Oleh :
Bantuan Sanitasi Sekolah Dasar Tim Teknis
.............................. .............................
Nip :..........................
Mengetahui :
Kepala Sekolah
........................................
....................................
Nip : ................................
BACK UP VOLUME
SANITASI
PEKERJAAN PERENCANAAN SANITASI SD 02 CAKRANEGARA
LOKASI SDN 02 CAKRANEGARA
TAHUN 2018
I LUAS BANGUNAN
1 LUAS BANGUNAN VOL. = P x L x JMH 37.60 M2
DALAM = 9.40 x 4.00 x 1.00 = 37.60 M2 37.60
37.60 M2 37.60
II PEKERJAAN TANAH
1 GALIAN PONDASI VOL. = P x L x T x JMH 6.72 M3
Galian pondasi bt.kali Memanjang = 7.00 x 0.80 x 0.60 x 2.00 = 6.72 M3
= 3.00 x 0.80 x 0.60 x 1.00 = 1.44 M3
Melintang = 4.00 x 0.80 x 0.60 x 5.00 = 9.60 M3
6.72 M3
1.48 M3
3.25 M3
5.92 M3
6 PONDASI BATU KALI VOL. = P x L x T x JMH 8.33 M3
Memanjang = 7.00 x 0.45 x 0.50 x 2.00 = 3.15 M3
Melintang = 3.00 x 0.45 x 0.50 x 1.00 = 0.68 M3
= 4.00 x 0.45 x 0.50 x 5.00 = 4.50 M3
8.33 M3
IV PEKERJAAN BETON
1 BETON RABAT BWH LANTAI VOL. = P x L x T x JMH 1.24 M3
= 1.37 x 1.87 x 0.05 x 4.00 = 0.51 M3
= 1.87 x 3.87 x 0.05 x 2.00 = 0.72 M3
1.24 M3
0.74 M3
26.80 M1
0.80 M3
65.89 M1
V PEKERJAAN PASANGAN/PLEST.
2 Trasram Bata 1/2 bt VOL. = P x T x SISI 21.21 M2
memanjang 9.40 = 9.27 x 0.30 x 2.00 = 5.56 M2
7.00 = 6.87 x 0.30 x 2.00 = 4.12 M2
3.00 = 3.00 x 0.30 x 1.00 = 0.90 M2
melintang 5.20 = 4.85 x 0.30 x 2.00 = 2.91 M2
4.00 = 3.65 x 0.30 x 5.00 = 5.48 M2
km 2.00 = 1.87 x 0.30 x 4.00 = 2.24 M2
21.21 M2
A 136.74 M2
B
lobang kusen = L x T x JMH
loster = 0.60 x 0.90 x 8.00 = 4.32 M2
P1 = 0.88 x 2.10 x 4.00 = 7.39 M2
lubang = 1.50 x 2.10 x 2.00 = 6.30 M2
= 0.50 x 0.60 x 4.00 = 1.20 M2
B 19.21 M2
VOL.AKHIR = A - B
= 136.74 - 19.21 = 117.53 M2
VI PEKERJAAN KERAMIK
1 LANTAI KERAMIK 30X30CM VOL. = P x L x JMH 41.72 M2
Dalam Ruang = 1.37 x 1.87 x 4.00 = 10.25 M2
= 1.87 x 3.87 x 2.00 = 14.47 M2
= 9.27 x 0.47 x 2.00 = 8.71 M2
= 3.87 x 1.07 x 2.00 = 8.28 M2
41.72 M2
4.32 M2
48.88 M1
17.00 M2
26.80 M1
X PEKERJAAN PENGECATAN
1 POLITURAN DAUN PINTU VOL. = LUAS x SISI 14.71 M2
= 5.01 x 1.00 = 5.01 M2
= 4.85 x 2.00 = 9.70 M2
14.71 M2
B
Lbg kusen = L x T x JMH
PU = 0.80 x 2.09 x 8.00 = 13.38 M2
P1 = 1.20 x 2.09 x 2.00 = 5.02 M2
loster = 0.60 x 0.90 x 8.00 = 4.32 M2
v1 = 0.50 x 0.40 x 4.00 = 0.80 M2
B 23.51 M2
VOL.AKHIR = A - B
= 136.86 - 23.51 = 113.35 M2
B
Lbg kusen = L x T x JMH
p1 = 1.20 x 2.06 x 2.00 = 4.94 M2
loster = 0.60 x 0.90 x 8.00 = 4.32 M2
v1 = 0.60 x 0.50 x 2.00 = 0.60 M2
andesit = 7.00 x 1.00 x 2.00 = 14.00 M2
B 23.86 M2
VOL.AKHIR = A - B
= 82.08 - 23.86 = 58.22 M2
79.90 M2
9.40 M1