HARGA
NO. UPAH KERJA / BAHAN SATUAN
(Rp)
1 2 3 4
I. UPAH KERJA
1 Pekerja Hari 174,000.00
2 Tukang Hari 185,000.00
3 Kepala Tukang Hari 200,000.00
4 Mandor Hari 210,000.00
2. Kerikil
Kerikil Sungai Pilihan/ Koral M3 140,000.00
Kerikil Sungai Tersaring M3 140,000.00
Kerikil Sungai Tak Tersaring M3 140,000.00
Batu Pecah 0,5 - 1 Cm (Spilt) M3 415,494.00
Batu Pecah 1 - 2 (Spilt) M3 415,494.00
Batu Pecah 2 - 3 (Spilt) M3 415,494.00
Batu Pecah 3 - 5 (Spilt) M3 415,494.00
Batu Pecah 5 - 7 (Spilt) M3 415,494.00
3. Batu - Batuan
Batu Utuh, Batu Kali, Batu Gunung M3 275,000.00
Batu Karang M3 125,000.00
Batu Andesit Bintik 15 x 30 cm M2 90,000.00
Batu Andesit Bintik 20 x 40 cm M2 95,000.00
Batu Sikat Motif Kecil Ktg 70,000.00
Batu Sikat Motif Besar Ktg 80,000.00
4. Batu Cetak :
Batu Bata Ukuran 5 x 11 x 22 cm Bh 665.00
Batu Bata Ukuran 5 x 9 x 22 cm Bh 453.33
Batu Bata Ukuran 5 x 7 x 22 cm Bh 380.00
Batu Bata Ukuran 5 x 11 x 22 cm M3 650,000.00
Batu Bata Ukuran 5 x 9 x 22 cm 1 M3 (700 Buah) M3 602,500.00
Batu Hebel 10 x 20 x 60 cm bh 7150
Roster beton 20x20 bh 12000
2. Semen
Semen Pc (40 Kg) Zak 45,000.00
Semen PC (50 Kg) Zak 55,000.00
Semen Warna/ Putih Kg 12,000.00
HARGA
NO. UPAH KERJA / BAHAN SATUAN
(Rp)
1 2 3 4
3. Bahan Atap
Seng Gelombang BJLS 0.20 Lbr 40,800.00
Seng Gelombang BJLS 0.18 Lbr 39,783.33
Genteng Metal (Multi Roof) T= 0,3 mm, 2 Susun Lbr 70,000.00
Genteng Metal (Sakura Roof) T= 0,3 mm, 2 Susun Lbr 27,540.00
Seng Plat BJLS 0.20 Lbr 44,641.67
Atap Zincalume 80 x 170 cm, T= 0,25 mm Lbr 70,000.00
Atap Spandek tebal 0,35 m2 70,000.00
5. Bahan Kayu
Balok 6/16 x 4 m (Kayu Kelas I), Kayu Lasi M3 2,559,392.00
Balok 6/16 x 4 m (Kayu Kelas II) M3 1,984,400.00
Balok 8/12 x 4 m (Kayu Kelas II) M3 2,350,000.00
Balok 6/10 x 4 m (Kayu Kelas II) M3 1,984,400.00
Balok 5/7 x 4 m (Kayu Kelas II) M3 1,984,400.00
Balok 5/7 x 4 m (Kayu Kelas III) M3 1,516,777.50
Kayu Bakesting (Kayu Kelas III) M3 1,637,130.00
Papan Palapi M3 1,785,960.00
Papan (Kayu Kelas II) M3 1,100,000.00
Papan Mall (Kayu Kelas III) M3 1,637,130.00
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' Btg 10,500.00
6. Bahan Bambu
Bambu Besar 15 - 20 Cm Btg 15,000.00
Bambu Sedang 10 - 15 Cm Btg 10,400.00
Bambu Kecil 5 - 10 Cm Btg -
NO. HARGA
UPAH KERJA / BAHAN SATUAN
(Rp)
1 2 3 4
Bahan Alumunium :
Kusen Alumunium 3" x 1,3/4", (Indalex) Coating Putih M1 77,916.67
Kusen Alumunium Open Back 4" x 1,3/4", (Indalex) Coating Putih M1 84,150.00
Kusen Alumunium Kaca Mati 4" x 1,3/4", (Indalex) Coating Putih M1 95,916.67
Kusen Alumunium Tutup Kaca Mati 4" x 1,3/4", (Indalex) Coating Putih M1 47,666.67
Kusen Alumunium Tutup Polos 4" x 1,3/4", (Indalex) Coating Putih M1 35,933.33
Profil Alumunium Curtain Wall 4,5 x 10 cm, Coating Putih M1 134,750.00
Profil Alumunium Curtain Wall 5 x 10 cm, Coating Putih M1 162,250.00
Profil Alumunium (Tutup Curtain Wall) 2 x 5 cm, Coating Putih M1 102,116.67
Daun Pintu Aluminium Rangka Kecil M2 1,000,000.00
Daun Pintu Aluminium Rangka Besar M2 1,800,000.00
Slimar Alumunium 3/8 M1 58,000.00
Slimar Alumunium 3/10 M1 74,000.00
Allumunium Strip M1 25,000.00
Cord - Kanal C Tebal = 1 mm Btg 118,000.00
Reng - Kanal U Tebal = 0,6 mm Btg 113,000.00
Braket L Btg 60,000.00
Alcopanel (Alumunium Composite Panel), Seven Type PPDF M2 400,000.00
Jendela Nako Unit 185,000.00
9. Bahan Kawat
Kawat Ikat Beton/ Bendrat Kg 20,000.00
Kawat Duri (50 m) 4 Kg Roll 156,250.00
Kawat Las Dos 150,000.00
Kawat Las LB (5 Kg) Kg 128,000.00
Kawat Las Listrik Kg 40,000.00
Kawat Las RB (5 Kg) Kg 92,000.00
NO. HARGA
UPAH KERJA / BAHAN SATUAN
(Rp)
1 2 3 4
Penggantung dan Ramset Buah 12,000.00
Canal C 45 M1 17,000.00
Kaki Seribu 65 M1 20,000.00
Stiffener/ Braket Bh 3,500.00
Braket T 20 Bh 2,000.00
Braket T 45 Bh 2,200.00
NO. HARGA
UPAH KERJA / BAHAN SATUAN
(Rp)
1 2 3 4
Cat Tembok :
Cat Dasar kg 20,000.00
Cat Tembok & Plafond (Interior) Kg 35,000.00
Cat Tembok Wathersield (Exterior) Kg 45,000.00
Cat Tembok Metrolait Kg 23,550.00
Cat Tembok Paragon (20 Kg) Kg 17,850.00
Cat Tembok Cathylac Kg 21,600.00
Plamur Tembok Kg 13,500.00
Dempul Tembok Kg 23,438.00
Polimer Mortar Kg 25,000.00
EAL Water Proofing Epoxy (02) Kg 160,000.00
Cat Besi :
Meny Seng Kg 27,344.00
Meny Besi Kg 50,000.00
Cat Besi Kg 75,000.00
Cat Coating Clear (Glotex) Kg 56,000.00
Cat Dicco Kg 87,000.00
Cat Atap Seng Kg 24,375.00
Cat Atap dan Genting Kg 24,375.00
Cat Vernis Kg 32,000.00
Thinner ltr 40,000.00
NO. HARGA
UPAH KERJA / BAHAN SATUAN
(Rp)
1 2 3 4
Pipa Listrik :
Pipa listrik 5/8" Btg 4,500.00
Pipa Conduit Hight Impact Ø 20 mm Btg 4,650.00
Fleksible 20 mm M1 6,000.00
Saklar/ Sekring :
Saklar tunggal, 10 A, 250 VAC (Setara Panasonic) Bh 25,000.00
Saklar Seri, 10 A, 250 VAC (Setara Panasonic) Bh 35,000.00
Saklar Triple, 10 A, 250 VAC (Setara Panasonic) Bh 40,000.00
Stop Kontak 2 Phase, 16 A Bh 28,000.00
Stop Kontak 1 Phase, 13 A Bh 22,000.00
Switch Socket AC + Indikator Lamp 16 A Bh 25,000.00
Exhaust Fan Set 250,000.00
Fitting Tempel Kotak Bh 15,000.00
Box Sekring 1 Fase Bh 20,350.00
Box Sekring 2 Fase Bh 27,637.50
Sekring Kas Kosong DN 2 G Bh 87,750.00
Sekring Kas Kosong DN 3 G Bh 90,000.00
Sekring Kas Kosong DN 4 G Bh 94,500.00
T Duss Bh 3,500.00
Elbow Bh 350.00
Las dop Bh 1,000.00
Inbow Does Bh 5,000.00
Mangkok Saklar/ Stop Kontak Bh 1,500.00
Klem Biasa Bh 100.00
Lampu Pijar :
Lampu 25 Watt Bh 5,400.00
10 - 40 Watt Bh 15,000.00
60 - 100 Watt Bh 25,000.00
Lampu SL 23 Watt Bh 36,945.00
Lampu SL 20 Watt Bh 34,000.00
Lampu SL 18 Watt Bh 30,629.00
Lampu SL 15 Watt Bh 30,000.00
Lampu SL 10 Watt Bh 27,714.00
Lampu SL 11 Watt Bh 29,500.00
Lampu SL 8 Watt Bh 24,799.00
Lampu SL 5 Watt Bh 10,000.00
Balon Lampu TL :
TL Biasa 20 Watt Bh 9,900.00
TL Biasa 40 Watt Bh 75,000.00
TL Blok Bambu 20 Watt Set 112,000.00
TL Blok Bambu 40 Watt Set 121,641.67
Lampu TL (Perset) :
10 - 20 Watt (Model keranjang) Set 45,000.00
20 - 40 Watt (Model keranjang) Set 75,000.00
40 - 60 Watt (Model keranjang) Set 125,000.00
Lampu RM (Perset) :
Lampu RMI TL 2 x 18 Watt, Stainlees Grill Set 350,000.00
Lampu RM TL 2 x 20 Watt Komplit, Stainlees Grill Set 395,000.00
Lampu RM TL 2 x 18 Watt Komplit, Glass ALML Set 375,000.00
Kran Air :
Kran Air 1/2 " Bh 40,000.00
Kran Leher Angsa Unit 325,000.00
Kran Shower Panas dan Dingin Bh 437,500.00
Kran Wudhu Unit 275,000.00
-
-
Halaman - 01
KETERANGAN
5
314.29
140.00
Bh
550,000
Zak
1,125.00
1,100.00
Halaman - 02
KETERANGAN
15,000.00 11.1111111111111
/Bh
/Bh
/Bh
3,333.33
/Bh
/Bh
/Bh
/Btg
/Btg
/Btg
/Btg
/Btg
/Btg
Halaman - 03
KETERANGAN
5
14,850.00
10,266.67
15,833.33
16,133.33
24,933.33
21,666.67
5,833.33
6,666.67
226.08
45.216
Btg
#REF!
Btg
44.28
Btg
/5 Kg
/5 Kg
Halaman - 04
KETERANGAN
5
12,750.00
16,651.75
31,500.00
2,375.00
2,225.00
12,875.00
/M1
6,750.00
16,250.00
22,250.00
30,000.00
46,250.00
45,250.00
Halaman - 05
KETERANGAN
5
Pail
Klg
Klg
Klg
Halaman - 06
KETERANGAN
5
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Roll
Halaman - 07
KETERANGAN
5
/Liter
11000
1. PEKERJAAN PERSIAPAN
a. Pekerjaan Pembersihan lahan
C TOTAL
Jumlah Harga
Rp 17,400.00
Rp 1,050.00
Rp 18,450.00
Rp 18,450.00
Jumlah Harga
Rp 17,400.00
Rp 18,500.00
Rp 2,000.00
Rp 1,050.00
Rp 38,950.00
Rp 11,459.91
Rp 480.00
Rp 11,459.91
Rp 23,399.82
Rp 23,399.82
m sd 2 m
Jumlah Harga
Rp 43,500.00
Rp 5,250.00
Rp 48,750.00
Rp 48,750.00
Jumlah Harga
Rp 52,200.00
Rp 2,100.00
Rp 54,300.00
Rp 228,000.00
Rp 228,000.00
Rp 228,000.00
Jumlah Harga
Rp 135,720.00
Rp 78,000.00
Rp 72,150.00
Rp 81,900.00
Rp 367,770.00
Rp 498,592.80
Rp 156,000.00
Rp 654,592.80
Rp 654,592.80
Jumlah Harga
Rp 135,720.00
Rp 78,000.00
Rp 72,150.00
Rp 81,900.00
Rp 367,770.00
#VALUE!