HARGA SATUAN UPAH, BAHAN DAN SEWA PERALATAN (SEMESTER IV)

PEKERJAAN KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN TAHUN 2015


Harga Bahan (Rp)
No Uraian Satuan Keterangan
Sebelum Pajak

B HARGA BAHAN :
1 Air Liter 100.00
2 Amplas Lembar 8,000.00
3 Asbes Gelombang 2,25 x 0.92 m x 5 mm Lembar 64,400.00
4 Asbes Gelombang 2.00 x 0.92 m x 5 mm Lembar 50,600.00
5 Asbes Gelombang 1.80 x 0.92 m x 5 mm Lembar 51,750.00
6 Asbes Gelombang 3.00 x 1.05 m x 4 mm Lembar 94,070.00
7 Asbes Gelombang 2.70 x 1.05 m x 4 mm Lembar 85,100.00
8 Asbes Gelombang 2.40 x 1.05 m x 4 mm Lembar 74,750.00
9 Asbes Gelombang 2.10 x 1.05 m x 4 mm Lembar 63,825.00
10 Asbes Gelombang 1.50 x 1.05 m x 4 mm Lembar 46,000.00
11 Asbes Gelombang 3.00 x 1.08 m x 6 mm Lembar 121,900.00
12 Asbes Gelombang 2.70 x 1.08 m x 6 mm Lembar 83,950.00
13 Asbes Gelombang 2.40 x 1.08 m x 6 mm Lembar 49,450.00
14 Asbes Gelombang 2.10 x 1.08 m x 6 mm Lembar 69,000.00
15 Asbes Gelombang 1.80 x 1.08 m x 6 mm Lembar 56,350.00
16 Asbes Semen M2 21,500.00
17 Bahan Agr.Base Kelas C M3 236,467.60
18 Bahan Agr.Base Kelas S M3 270,103.25
19 Baja Bergelombang Kg 15,000.00
20 Baja Prategang kg 25,000.00
21 Bak porselen Buah 2,500,000.00
22 Batu Apung Kg 25,000.00
23 Batu bata Buah 430.00
24 Batu Belah Hitam Utk Pondasi M3 404,000.00
25 Batu Belah Hitam 1/2 Cm (Split) M3 543,000.00 AABI 2013
26 Bentonit Kg 8,500.00
27 Besi Baja IWF Kg 18,500.00
28 Besi Beton Polos Kg 18,500.00
29 Besi Beton Ulir Kg 18,500.00
30 Besi Siku Kg 18,500.00
31 Bubungan Bulat Genteng Zincalume pasir M 25,000.00
32 Cat Dasar Kg 135,000.00
33 Cat Kayu/Besi Kg 57,000.00
33 Cat Meni kayu Kg 65,000.00
34 Cat Meni kayu Kg 65,000.00
35 Cat meni besi Kg 65,000.00
37 Cat Tembok Kg 150,000.00
38 Cat Tembok Exterior Kg 205,000.00
39 Dolken kayu φ(8-10) Batang 25,000.00
40 Gravel Pak 1 - 2 mm M1 334,300.00
Harga Bahan (Rp)
No Uraian Satuan Keterangan
Sebelum Pajak

41 Genteng Zincalume pasir M2 170,000.00


42 Joint Sealent M 275.00
43 Kabel Listrik NYM 3 x 2,5 mm m 11,365.00
44 Kaca Bening 5mm M2 75,000.00
45 kawat Beton Kg 22,000.00
46 Kayu kelas II balok M3 2,800,000.00
47 Kayu Balok kelas III M3 2,500,000.00
48 Kayu Kasau kelas III M3 2,250,000.00
49 Kayu Papan kelas II M3 2,800,000.00
50 Kayu Papan kelas III M3 2,500,000.00
51 Keramik 30/30 Polos M2 58,000.00
52 Kloset Jongkok Teraso Buah 300,000.00
53 Kran air Ø 1/2 " Buah 25,000.00
54 Kwas cat Buah 17,000.00
55 Lampu LED Panel Outbouw Buah 225,000.00
56 Lampu LED 13 Watt + Fitting Buah 74,500.00
57 Lampu LED 5 Watt + Fitting Buah 32,500.00
59 Latasir di AMP (Material Hotmix) Ton 1,260,055.00
60 Lem Plastik / Kayu Kg 16,000.00
61 Mata Bor 6" Buah 25,300,000.00
62 Mata Bor 8" Buah 32,200,000.00
63 Minyak Begisting Liter 5,175.00
64 Minyak Cat / Thinner Liter 25,000.00
65 Minyak pelumas / Oli Liter 30,000.00
66 Paku 5 – 10 cm Kg 19,000.00
66 Paku Kasau/balok/reng/papan Kg 19,000.00
67 Paku Sekrup (50 Bh / Kg) bh 12,000.00
68 Paku Seng (100 Bh / Kg) Kg 24,000.00
69 Pasir beton M3 330,000.00
70 Pasir Pasang M3 320,000.00 AABI 2013
71 Pasir Urug M3 205,000.00
72 Paving Block Segi Delapan Buah 2,250.00
73 Pipa Galvanis Ø 1" Batang 99,000.00
75 Pipa Galvanis Ø 1½" Batang 107,250.00
74 Pipa Galvanis Ø 2" Batang 110,000.00
75 Pipa PVC Ø 1" Batang 35,000.00
76 Pipa PVC Ø 1/2" Batang 17,500.00
77 Pipa PVC Ø 2" Batang 75,000.00
78 Pipa PVC Ø 2 1/2" Batang 93,500.00
79 Pipa PVC Ø 3" Batang 150,000.00
80 Pipa PVC Ø 3/4" Batang 25,000.00
81 Pipa PVC Ø 4" Batang 225,000.00
82 Plamir kayu / besi Kg 45,000.00
83 Plamir Tembok Kg 53,000.00
84 Plywood 9 mm (240x120x0,9) cm Lembar 143,750.00
85 Profil U.85-06 Btg 112,125.00
Harga Bahan (Rp)
No Uraian Satuan Keterangan
Sebelum Pajak

86 Profil reng RT.15 Btg 67,275.00


87 Plat perletakan Bh 66,300.00
88 Profil Lisplank Zingkalum M1 70,000.00
89 Profil CT 6407-07 M1 3,758.33
90 Plat sudut Bh 23,400.00
91 Profil alluminium M 50,000.00
92 Profil Kaca M 8,625.00
93 Saklar Triple Buah 43,000.00
94 Saklar Ganda Buah 36,000.00
95 Saklar tunggal Buah 18,000.00
96 Stop Kontak Buah 25,000.00
97 Saringan Air / Floor Drain Buah 45,500.00
98 Sealant Tube 26,000.00
99 Seal tape Buah 4,000.00
100 Selinder type 08510 ex. Cisa Buah 278,300.00
101 Semen PC (50 Kg) Zak 68,000.00
102 Semen Putih (50 Kg) Kg 15,000.00
103 Seng Alumunium M2 45,000.00
104 Spandex T: 0.03 mm M2 80,000.00
105 Skrup Fixer Buah 575.00
106 Solar Liter 11,650.00 Non Subsidi
107 Tanah Timbunan Biasa M3 150,000.00
108 Wastafel Buah 650,000.00
109 Water drain + asesories Set 86,250.00

Bandar Lampung, 2015


DAFTAR HARGA UPAH
SEMESTER II TAHUN 2014

No Uraian Satuan Harga Upah (Rp) Keterangan


A HARGA UPAH :
1 Ahli Bor Hari 110,000.00
2 Kepala Tukang Hari 105,000.00
3 Mandor Hari 115,000.00
4 Mekanik Hari 115,000.00
5 Operator Terlatih Hari 125,000.00
6 Operator Bor Hari 125,000.00
7 Pembantu Operator Bor Hari 70,000.00
8 Ass. Intalatur Listrik Hari 70,000.00
9 Pekerja Hari 70,000.00
10 Pekerja tak Terlatih Hari 90,000.00
11 Pembantu Operator Hari 70,000.00
12 Pembantu Mekanik Hari 70,000.00
13 Pembantu Sopir Hari 75,000.00
14 Penjaga Malam Hari 58,300.00
15 Sopir Terlatih Hari 90,000.00
16 Tukang Anyam, Las Hari 90,000.00
17 Tukang Batu Hari 90,000.00
18 Tukang Besi Hari 90,000.00
19 Tukang Cat Hari 90,000.00
20 Tukang Kayu Hari 90,000.00
21 Intalatur Listrik Hari 90,000.00
22 Tukang Pipa Hari 90,000.00

Bandar Lampung, 2015

WALIKOTA BANDAR LAMPUNG

HERMAN, HN
PEMERINTAH KABUPATEN TULANG BAWANG
DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI
JALAN CEMARA KOMPLEK PERKANTORAN PEMDA KAB. TULANG BAWANG
MENGGALA

RENCANA ANGGARAN BIAYA


(RAB)

KEGIATAN :
PENGEMBANGAN SARANA DAN PRASARANA
KAWASAN TRANSMIGRASI

PEKERJAAN :
Pembangunan Islamic Center Tahap 2

LOKASI
KECAMATAN RAWA PITU
KABUPATEN TULANG BAWANG

APBN
TAHUN ANGGARAN 2016
KODE PEKERJAAN SATUAN

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A.2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
A.2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
A.2.2.1.3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
A.2.2.1.4 Pengukuran dan pemasangan 1 m’ Bouwplank
A.2.2.1.5 Pembuatan 1 m2 kantor sementara lantai plesteran
A.2.2.1.6 Pembuatan 1 m2 rumah jaga (konstruksi kayu )
A.2.2.1.7 Pembuatan 1 m2 gudang semen dan peralatan
A.2.2.1.8 Pembuatan 1 m2 bedeng pekerja
A.2.2.1.9 Pembersihan 1 m2 lapangan dan perataan
A.2.2.1.10 Pembuatan 1 m2 steger/perancah dari bambu
A.2.2.1.11 Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm
A.2.2.1.12 Pembuatan 1 m2 jalan sementara
A.2.2.1.13 Pembongkaran 1 m3 beton bertulang
A.2.2.1.14 Pembongkaran 1 m3 dinding tembok bata
A.2.2.1.15 Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm
A.2.2.1.16 Pemasangan 1 m2 panel beton pracetak 5x50x213 cm
A.2.2.1.17 1 Unit pekerjaan perancah scaffolding
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
A.2.3.1.2 Penggalian 1 m3 tanah biasa sedalam 2 m
A.2.3.1.3 Menggali 1 m3 tanah biasa sedalam 3 m
A.2.3.1.4 Menggali 1 m3 tanah keras sedalam 1 m
A.2.3.1.5 Menggali 1 m3 tanah cadas sedalam 1 m
A.2.3.1.6 Menggali 1 m3 tanah lumpur sedalam 1 m
A.2.3.1.7 Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter
A.2.3.1.8 Pembuangan 1 m3 tanah sejauh 30 meter
A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah
A.2.3.1.10 Pemadatan tanah 1 m3 tanah ( per 20 cm)
A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug
A.2.3.1.12 Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL
A.2.3.1.13 Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan
A.2.3.1.14 Pengurugan 1 m3 sirtu padat
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
A.3.2.1.2 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP
A.3.2.1.4 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
A.3.2.1.5 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP
A.3.2.1.6 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP
A.3.2.1.7 Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP
A.3.2.1.8 Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP
A.3.2.1.9 Pemasangan 1 m3 batu kosong (anstamping)
A.3.2.1.10 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
A.3.2.1.11 Pemasangan 1 m3 pondasi sumuran, diameter 100 cm
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100),slump (3-6) cm, w/c = 0,87
A.4.1.1.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
A.4.1.1.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
A.4.1.1.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
A.4.1.1.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
A.4.1.1.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
A.4.1.1.11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
A.4.1.1.12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100
A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm
A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm
A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
A.4.1.1.18 Pemasangan 10 kg kabel presstressed polos/strands
A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)
A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof
A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom
A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok
A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai
A.4.1.1.25 Pemasangan 1 m2 bekisting untuk dinding
A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga
A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton
A.4.1.1.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
A.4.1.1.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
A.4.1.1.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
A.4.1.1.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)
A.4.1.1.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
A.4.1.1.33a Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting)
A.4.1.1.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
A.4.1.2.1 Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2)
A.4.1.2.2 Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ±2 )cm
A.4.1.2.3 Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ±2) cm
A.4.1.2.4 Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ±2 cm)
A.4.1.2.5 Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai)
A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
A.4.1.2.7 Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
A.4.1.2.8 Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
A.4.1.2.9 Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
A.4.1.2.10 Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
A.4.1.2.11 Penuangan/menebar beton untuk 1 buah komponen plat pracetak
A.4.1.2.12 Penuangan/menebar beton untuk 1 buah komponen balok pracetak
A.4.1.2.13 Penuangan/menebar beton untuk 1 buah komponen kolom pracetak
A.4.1.2.14 Mendirikan 1 buah komponen plat pracetak
A.4.1.2.15 Mendirikan 1 buah komponen balok pracetak
A.4.1.2.16 Mendirikan 1 buah komponen kolom pracetak
A.4.1.2.17 Melangsir 1 buah komponen plat pracetak ( ± 20 m)
A.4.1.2.18 Melangsir 1 buah komponen balok pracetak ( ± 20 m)
A.4.1.2.19 Melangsir 1 buah komponen kolom pracetak ( ± 20 m)
A.4.1.2.20 Bahan 1 m3 grouting campuran
A.4.1.2.21 Bahan 1 m3 grouting tidak campuran
A.4.1.2.22 Upah melakukan 1 titik grouting pada join pracetak
A.4.1.2.23 Pemasangan 1 titik Bekisting join pracetak
A.4.1.2.24 Upah 1 titik Join dengan Sling
HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1 Pemasangan 1 kg besi profil
A.4.2.1.2 Pemasangan 1 kg rangka kuda-kuda baja IWF
A.4.2.1.3 Pengerjaan 1 kg pekerjaan perakitan
A.4.2.1.4 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
A.4.2.1.5 Pengerjaan 1 cm pengelasan dengan las listrik
A.4.2.1.6 Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm
A.4.2.1.7 Pemasangan 1 m2 pintu rolling door besi
A.4.2.1.8 Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC
A.4.2.1.9 Pemasangan 1 m2 sunscreen alluminium
A.4.2.1.10 Pemasangan 1 m2 rolling door alluminium
A.4.2.1.11 Pemasangan 1 m kusen pintu alluminium
A.4.2.1.12 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm
A.4.2.1.13 Pemasangan 1 m2 pintu kaca rangka alluminium
A.4.2.1.13a Pemasangan 1 m2 Jendela rangka alluminium
A.4.2.1.13b Pemasangan 1 m2 pintu teakwood rangkap, rangka alumunium
A.4.2.1.14 Pemasangan 1 m2 venetions blinds dan Vertical blinds
A.4.2.1.15 Pemasangan 1 m2 terali besi strip (2 x 3) mm
A.4.2.1.16 Pemasangan 1 m2 kawat nyamuk
A.4.2.1.17 Pemasangan 1 m2 jendela nako & tralis
A.4.2.1.18 Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
A.4.2.1.22 Pemasangan 1 m2 Rangka Atap Baja Ringan Zincalumne
A.4.2.1.23 Pemasangan 1 m' Talang patahan atap Zincalumne
A.4.2.1.24 Pemasangan 1 m' Lisplank Zincalumne
A.4.2.1.25 Pemasangan 1 m' Lisplank GRC 20cm

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A.4.4.1.1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP :2PP
A.4.4.1.2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
A.4.4.1.3 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
A.4.4.1.4 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
A.4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
A.4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :5PP
A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
A.4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
A.4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
A.4.4.1.16 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP
A.4.4.1.17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP :4PP
A.4.4.1.18 Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP
A.4.4.1.19 Pemasangan 1 cm2 dinding conblock HB15 campuran 1SP :4PP
A.4.4.1.20 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP
A.4.4.1.21 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP
A.4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
A.4.4.1.24 Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.1 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm.
A.4.4.2.2 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.
A.4.4.2.3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.
A.4.4.2.4 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
A.4.4.2.5 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm
A.4.4.2.6 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.
A.4.4.2.7 Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm
A.4.4.2.8 Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm
A.4.4.2.9 Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm
A.4.4.2.10 Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm
A.4.4.2.11 Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm
A.4.4.2.12 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm
A.4.4.2.13 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm
A.4.4.2.14 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm
A.4.4.2.15 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm.
A.4.4.2.16 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm
A.4.4.2.17 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm
A.4.4.2.18 Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm
A.4.4.2.19 Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm
A.4.4.2.20 Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm
A.4.4.2.21 Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm
A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm
A.4.4.2.23 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP
A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah
A.4.4.2.25 Pemasangan 1 m2 finishing siar pasangan conblock ekspose
A.4.4.2.26 Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
A.4.4.2.27 Pemasangan 1 m2 acian.
A.4.4.2.28 Pemasangan 1 m' profilan semen
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.9 Pemasangan 1m2 lantai ubin granit ukuran 40cm x40cm
A.4.4.3.10 Pemasangan 1m2 lantai ubin granit ukuran 30cm x30cm
A.4.4.3.25 Pemasangan 1 m’ plint ubin granit ukuran 10cm x 30cm
A.4.4.3.34 Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm
A.4.4.3.35 Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm
A.4.4.3.35a Pemasangan 1m2 lantai keramik kasar ukuran 30cm x 30cm
A.4.4.3.35b Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm
A.4.4.3.35c Pemasangan 1m2 lantai keramik ukuran 60cm x 60cm (Polished)
A.4.4.3.35d Pemasangan 1m2 lantai keramik ukuran 80cm x 80cm (Polished)
A.4.4.3.36 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm
A.4.4.3.37 Pemasangan 1m2 lantai keramik ukuran 10cm x 33cm untuk variasi/border
A.4.4.3.38 Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm
A.4.4.3.39 Pemasangan 1 m’ plint keramik ukuran 10cm x 20cm
A.4.4.3.39a Pemasangan 1 m’ plint keramik ukuran 10cm x 40cm
A.4.4.3.39b Pemasangan 1 m’ plint keramik ukuran 10cm x 50cm
A.4.4.3.39c Pemasangan 1 m’ plint keramik ukuran 10cm x 60cm
A.4.4.3.39d Pemasangan 1 m’ plint keramik ukuran 10cm x 80cm
A.4.4.3.40 Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm
A.4.4.3.41 Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm
A.4.4.3.42 Pemasangan 1 m’ plint internal cove artistik 5cm x 5cm x 20cm
A.4.4.3.43 Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm
A.4.4.3.44 Pemasangan 1 m2 lantai karpet
A.4.4.3.45 Pemasangan 1 m2 underlayer (pelapis bawah karpet)
A.4.4.3.46 Pemasangan 1 m2 lantai parquet kayu
A.4.4.3.47 Pemasangan 1 m2 lantai kayu gymfloor
A.4.4.3.48 Pemasangan 1 m2 dinding porslen 11cm x 11cm
A.4.4.3.49 Pemasangan 1 m2 dinding porslen 10cm x 20cm
A.4.4.3.50 Pemasangan 1 m2 dinding porslen 20cm x 20cm
A.4.4.3.51 Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm
A.4.4.3.52 Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm
A.4.4.3.53 Pemasangan 1 m2 dinding keramik 10cm x 20cm
A.4.4.3.54 Pemasangan 1 m2 dinding keramik 20cm x 20cm
A.4.4.3.54a Pemasangan 1 m2 dinding keramik 20cm x 25cm
A.4.4.3.54b Pemasangan 1 m2 dinding keramik 20cm x 40cm
A.4.4.3.54c Pemasangan 1 m2 dinding keramik 30cm x 60cm
A.4.4.3.55 Pemasangan 1 m2 dinding marmer 100cm x 100cm
A.4.4.3.56 Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm
A.4.4.3.57 Pemasangan 1 m2 dinding batu paras
A.4.4.3.58 Pemasangan 1 m2 dinding batu tempel hitam
A.4.4.3.59 Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm
A.4.4.3.60 Pemasangan 1 m2 wallpaper lebar 50 cm
A.4.4.3.61 Pemasangan 1m2 floor harderner
A.4.4.3.61a Pemasangan 1m2 floor lantai
A.4.4.3.62 Pemasangan 1 m’ plint vynil 15cm x 30cm
A.4.4.3.63 Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A.4.5.1.1 Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
A.4.5.1.2 Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm
A.4.5.1.3 Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm
A.4.5.1.4 Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm
A.4.5.1.5 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
A.4.5.1.6 Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm
A.4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
A.4.5.1.7a Pemasangan 1 m2 langit-langit gypsum board ukuran, tebal 9 mm + rangka galvanis
A.4.5.1.7b Pemasangan 1 m2 langit-langit PVC board + rangka galvanis
A.4.5.1.8 Pemasangan 1 m’ list langit-langit gypsum
A.4.5.1.9 Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka
A.4.5.1.10 Pemasangan 1 m’ list langit-langit kayu profil
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.1 Pemasangan 1 m2 atap genteng palentong kecil
A.4.5.2.2 Pemasangan 1 m2 atap genteng kodok glazuur
A.4.5.2.3 Pemasangan 1 m2 atap genteng palentong besar/super
A.4.5.2.4 Pemasangan 1 m’ bubung genteng palentong
A.4.5.2.5 Pemasangan 1 m’ bubung genteng kodok glazuur
A.4.5.2.6 Pemasangan 1 m’ bubung genteng palentong besar
A.4.5.2.7 Pemasangan 1 m2 roof light fibreglass 90x180
A.4.5.2.8 Pemasangan 1 m2 atap asbes gelombang 0,92mx2,5m x 5mm
A.4.5.2.9 Pemasangan 1 m2 atap asbes gelombang 0,92mx2,25m x 5mm
A.4.5.2.10 Pemasangan 1 m2 atap asbes gelombang 0,92mx2,00m x 5mm
A.4.5.2.11 Pemasangan 1 m2 atap asbes gelombang 0,92mx1.80m x 5mm
A.4.5.2.12 Pemasangan 1 m2 atap asbes gelombang 1.05mx3.00m x 4mm
A.4.5.2.13 Pemasangan 1 m2 atap asbes gelombang 1.05mx2.70m x 4mm
A.4.5.2.14 Pemasangan 1 m2 atap asbes gelombang 1.05mx2.40m x 4mm
A.4.5.2.15 Pemasangan 1 m2 atap asbes gelombang 1.05mx2.10m x 4mm
A.4.5.2.16 Pemasangan 1 m2 atap asbes gelombang 1.05mx1.50m x 4mm
A.4.5.2.17 Pemasangan 1 m2 atap asbes gelombang 1.08mx3.00m x 6mm
A.4.5.2.18 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.70m x 6mm
A.4.5.2.19 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.40m x 6mm
A.4.5.2.20 Pemasangan 1 m2 atap asbes gelombang 1.08mx2.10m x 6mm
A.4.5.2.21 Pemasangan 1 m2 atap asbes gelombang 1.08mx1.80m x 6mm
A.4.5.2.22 Pemasangan 1 m’ bubung stel gelombang 0,92m
A.4.5.2.23 Pemasangan 1 m’ bubung stel gelombang 1,05m
A.4.5.2.24 Pemasangan 1 m’ bubung stel gelombang 1,08m
A.4.5.2.30 Pemasangan 1 m2 genteng beton
A.4.5.2.31 Pemasangan 1 m2 genteng aspal
A.4.5.2.32 Pemasangan 1 m2 genteng metal polos
A.4.5.2.32a Pemasangan 1 m2 genteng metal pasir
A.4.5.2.33 Pemasangan 1 m2 atap sirap kayu
A.4.5.2.34 Pemasangan 1 m’ nok genteng beton
A.4.5.2.35 Pemasangan 1 m’ nok genteng aspal
A.4.5.2.36 Pemasangan 1 m’ nok genteng metal polos
A.4.5.2.36a Pemasangan 1 m’ nok genteng metal pasir
A.4.5.2.38 Pemasangan 1 m2 atap seng gelombang
A.4.5.2.39 Pemasangan 1 m’nok atap seng
A.4.5.2.42 Pemasangan 1 m2 alumunium foil/sisalation
A.4.5.2.43 Pemasangan 1 m' nok atap spandek
A.4.5.2.44 Pemasangan 1 m2 Atap Genteng Metal Polos
A.4.5.2.44a Pemasangan 1 m2 Atap Genteng Metal Pasir
A.4.5.2.45 Pemasangan 1 m2 Atap Spandek Polos
A.4.5.2.45a Pemasangan 1 m2 Atap Spandek Warna

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A.4.6.1.1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
A.4.6.1.2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
A.4.6.1.3 Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II
A.4.6.1.4 Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
A.4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
A.4.6.1.6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
A.4.6.1.7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
A.4.6.1.8 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
A.4.6.1.9 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
A.4.6.1.10 Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II
A.4.6.1.11 Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I
A.4.6.1.12 Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
A.4.6.1.13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III
A.4.6.1.14 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I
A.4.6.1.15 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
A.4.6.1.16 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II
A.4.6.1.17 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II
A.4.6.1.18 Pemasangan 1 m2 rangka atap sirap, kayu kelas II
A.4.6.1.19 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
A.4.6.1.20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
A.4.6.1.21 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
A.4.6.1.22 Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
A.4.6.1.23 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
A.4.6.1.24 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
A.4.6.1.25 Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II
A.4.6.1.24a Pemasangan 1 m2 dinding pemisah gypsum rangkap, rangka galvanis
A.4.6.1.26 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I
A.4.6.1.27 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm
A.4.6.1.28 Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.1 Pemasangan 1 buah kunci tanam antik
A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa
A.4.6.2.3 Pemasangan 1 buah kunci kamar mandi
A.4.6.2.4 Pemasangan 1 buah kunci silinder
A.4.6.2.5 Pemasangan 1 buah engsel pintu
A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu
A.4.6.2.7 Pemasangan 1 buah engsel angin
A.4.6.2.8 Pemasangan 1 buah spring knip
A.4.6.2.9 Pemasangan 1 buah kait angin
A.4.6.2.10 Pemasangan 1 buah door closer
A.4.6.2.11 Pemasangan 1 buah kunci slot
A.4.6.2.12 Pemasangan 1 buah Door holder
A.4.6.2.13 Pemasangan 1 buah door stop
A.4.6.2.14 Pemasangan 1 buah rel pintu sorong
A.4.6.2.15 Pemasangan 1 buah kunci lemari
A.4.6.2.16 Pemasangan 1 m2 kaca tebal 3 mm
A.4.6.2.17 Pemasangan 1 m2 kaca tebal 5 mm
A.4.6.2.17a Pemasangan 1 m2 kaca Riben/Buram tebal 5 mm
A.4.6.2.18 Pemasangan 1 m2 kaca tebal 8 mm
A.4.6.2.18a Pemasangan 1 m2 kaca Riben/Buram tebal 8 mm
A.4.6.2.19 Pemasangan 1 m2 kaca tempered tebal 12 mm
A.4.6.2.20 Pemasangan 1 m2 kaca cermin tebal 5 mm
A.4.6.2.21 Pemasangan 1 m2 kaca cermin tebal 8 mm
A.4.6.2.22 Pemasangan 1 m2 kaca wireglassed tebal 5 mm
A.4.6.2.23 Pemasangan 1 m2 kaca patri tebal 5 mm
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1 1 m2 Pengikisan/pengerokan permukaan cat lama
A.4.7.1.2 1 m2 Pencucian bidang permukaan tembok yang pernah dicat
A.4.7.1.3 1 m2 Pengerokan karat pada permukaan baja cara manual
A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A.4.7.1.5 Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
A.4.7.1.6 Pelaburan 1 m2 bidang kayu dengan teak oil
A.4.7.1.7 Pelaburan 1 m2 bidang kayu dengan politur
A.4.7.1.8 Pelaburan 1 m2 bidang kayu dengan cat residu dan ter
A.4.7.1.9 Pelaburan 1 m2 bidang kayu dengan vernis
A.4.7.1.10 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A.4.7.1.10a Pengecatan 1 m2 tembok baru ( 1lapis alkali, 2 lapis cat penutup cat eksterior)
A.4.7.1.11 Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
A.4.7.1.12 Pelaburan 1 m2 tembok dengan kalkarium
A.4.7.1.13 Pelaburan 1 m2 tembok dengan kapur sirih
A.4.7.1.14 Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)
A.4.7.1.15 Pemasangan 1 m2 wallpaper
A.4.7.1.16 Pengecatan 1 m2 permukaan baja dengan menie besi
A.4.7.1.17 Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1 Pemasangan 1 buah closet duduk/monoblock
A.5.1.1.2 Pemasangan 1 buah closet jongkok porslen
A.5.1.1.3 Pemasangan 1 buah closet jongkok teraso
A.5.1.1.4 Pemasangan 1 buah urinoir
A.5.1.1.5 Pemasangan 1 buah wastafel
A.5.1.1.6 Pemasangan 1 buah bak mandi teraso vol 0,3 m3
A.5.1.1.7 Pemasangan 1 buah bak air fibreglass vol 0,3 m3
A.5.1.1.8 Pemasangan 1 buah bak mandi pas.bata s vol 0,3 m3
A.5.1.1.9 Pemasangan 1 buah bathcuip porselen
A.5.1.1.10 Pemasangan 1 buah bak air beton vol 1 m3
A.5.1.1.11 Pemasangan 1 buah bak fibreglass vol 1 m3
A.5.1.1.12 Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
A.5.1.1.13 Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm
A.5.1.1.14 Pemasangan 1 m’ pipa beton diameter 15 – 20 cm
A.5.1.1.15 Pemasangan 1 m’ pipa beton diameter 30 – 100 cm
A.5.1.1.16 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
A.5.1.1.17 Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
A.5.1.1.18 Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
A.5.1.1.19 Pemasangan 1 m’ pipa galvanis diameter ½”
A.5.1.1.20 Pemasangan 1 m’ pipa galvanis diameter 3/4”
A.5.1.1.21 Pemasangan 1 m’ pipa galvanis diameter 1”
A.5.1.1.22 Pemasangan 1 m’ pipa galvanis diameter 1 ½”
A.5.1.1.23 Pemasangan 1 m’ pipa galvanis diameter 3”
A.5.1.1.24 Pemasangan 1 m’ pipa galvanis diameter 4”
A.5.1.1.25 Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”
A.5.1.1.26 Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”
A.5.1.1.27 Pemasangan 1 m’ pipa PVC tipe AW diameter 1”
A.5.1.1.28 Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2”
A.5.1.1.29 Pemasangan 1 m’ pipa PVC tipe AW diameter 2”
A.5.1.1.30 Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2”
A.5.1.1.31 Pemasangan 1 m’ pipa PVC tipe AW diameter 3”
A.5.1.1.32 Pemasangan 1 m’ pipa PVC tipe AW diameter 4”
A.5.1.1.33 Pemasangan 1 buah bak cuci piring stainlessteel
A.5.1.1.34 Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
A.5.1.1.35 Pemasangan 1 buah kran diameter ½” atau 3/4”
A.5.1.1.36 Pemasangan 1 buah floor drain
A.6.1.1 PEKERJAAN INSTALASI LISTRIK
A.6.1.1.1 1 Titik Instalasi Listrik
A.6.1.1.2 1 Buah Pasang saklar Triple
A.6.1.1.3 1 Buah Pasang saklar Double
A.6.1.1.4 1 Buah Pasang saklar Single
A.6.1.1.5 1 Buah Pasang Stop Kontak
A.6.1.1.6 1 buah Lampu Downlight
A.6.1.1.7 1 buah Lampu TL 2x18 watt Inbow Divider
A.6.1.1.8 1 buah Lampu TL 2x36 watt Inbow Divider
A.6.1.1.9 Pas. 1 buah Lampu SL 18 Watt
HARGA

258,467.00
310,837.00
464,127.00
289,665.00
1,055,310.00
801,300.00
771,105.00
810,530.00
75,750.00
294,510.00
117,510.00
134,608.62
1,009,970.00
504,985.00
10,491.00
411,748.00
195,000.00

55,375.00
68,175.00
81,205.00
73,680.00
111,900.00
89,175.00
4,075.00
24,250.00
40,750.00
40,750.00
190,150.00

162,225.00
268,775.00

618,920.00
577,080.00
584,760.00
527,640.00
499,640.00
328,631.20
455,860.00
435,700.00
158,760.00
3,320,549.00
634,609.00

715,292.08
1,050,053.10
999,174.75
964,104.52
1,107,152.86
1,136,280.48
1,159,168.57
1,173,020.95
1,197,133.57
1,204,438.10
1,274,195.24
1,283,918.10
1,437,250.00
85,260.00
134,907.50

20,878.25
196,220.00
196,152.50
139,637.50
148,387.50
278,075.00
256,295.00
343,920.00
403,700.00
277,816.25
99,505.00
5,186,107.50
6,430,955.00
8,509,000.00
7,954,605.00
7,140,432.50
6,913,117.50
7,140,432.50
7,488,685.00
98,804.50
125,822.50

90,688.43
110,746.79
123,305.14
166,127.68
240,205.36
20,220.00
18,757.00
5,905.00
9,505.00
7,705.00
49,925.00
51,310.00
46,280.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6,451,883.33
9,657,029.63
83,005.00
61,338.00
59,565.00

25,525.00
31,850.00
480.93
807,805.00
3,224.40

205,290.00
77,550.00

725,725.00
70,573.00
559,575.50
539,620.00
451,620.00
570,870.00
-
383,312.68
102,555.04
199,751.00
119,790.00
89,560.00
63,095.00
82,828.33
145,107.50
124,968.25
121,254.00
55,721.50

206,705.00
199,682.00
191,618.00
188,582.00
189,950.00
174,008.80
100,807.00
95,218.20
92,275.00
90,439.80
89,870.20
87,715.00
87,695.00
71,899.48
71,174.04
-
-
-
-
-
-
313,935.00
313,935.00
657,055.00

59,505.44
53,604.64
51,235.36
49,466.40
48,670.24
47,945.76
47,280.16
51,780.16
50,463.60
48,610.00
43,842.24
44,279.52
77,809.52
74,650.48
72,185.20
71,230.32
70,797.68
61,362.24
34,380.24
51,100.00
-
-
54,105.20
23,236.88
11,106.00
50,262.40
29,620.00
237,492.00

340,138.00
260,371.00
37,633.40
193,178.40
205,635.82
211,355.00
232,645.00
418,024.00
554,040.00
202,434.00
-
852,674.00
42,400.40
35,410.40
36,910.40
51,964.40
64,910.40
39,250.40
28,806.20
-
512,460.40
51,020.00
73,650.00
338,700.00
338,700.00
-
-
-
-
-
-
229,288.00
244,338.00
287,588.00
287,590.50
656,878.40
-
201,730.00
201,730.00
1,159,395.00
376,015.00
92,430.00
39,085.36
182,500.00
52,659.00

33,165.00
154,400.00
132,600.00
126,125.00
34,425.00
201,250.00
39,749.80 82,828.33 122,578.13
123,856.00

22,070.00
304,042.50
15,815.00

52,707.50
39,010.00
64,010.00
86,700.00
85,450.00
87,850.00
62,970.00
53,030.00
59,470.00
50,520.00
57,660.00
48,510.00
50,400.00
48,760.00
49,230.00
56,160.00
65,263.00
52,061.00
65,010.00
53,970.00
52,279.50
85,576.60
52,276.60
56,651.60
96,709.11
213,745.00
78,864.00
105,358.50
297,843.86
115,228.00
60,602.50
89,279.00
104,404.00
42,000.00
30,435.00
25,527.50
105,457.20

63,927.50
80,927.50

13,139,575.00
7,243,500.00
292,695.00
228,695.00
538,000.00
402,300.00
282,455.00
436,935.00
477,060.00
490,160.00
634,060.00
548,080.00
6,397,200.00
14,581,275.00
7,174,890.00
195,625.00
269,125.00
-
84,400.00
82,937.50
72,075.00
72,275.00
117,945.00
264,991.00
208,900.00
112,286.60
301,577.00
36,055.00
100,419.00

379,845.00
196,525.00
100,945.00
175,945.00
36,217.00
25,807.50
35,807.50
42,045.00
42,045.00
209,095.00
72,115.00
229,095.00
66,325.00
299,845.00
42,024.50
94,467.00
113,717.00
149,467.00
256,628.50
344,628.50
743,774.50
181,217.00
349,310.00
578,045.00
198,035.00

12,345.00
11,345.00
11,920.00
25,265.00
35,675.00
37,030.00
52,191.00
16,230.00
38,325.00
17,046.50
35,426.50
12,586.00
16,526.00
13,338.00
-
204,787.50
24,472.50
47,460.00
2,734,450.00
530,510.00
390,870.00
1,227,610.00
908,510.00
-
347,950.00
1,552,650.00
2,180,970.00
5,784,367.79
1,507,750.00
174,184.80
324,120.00
106,940.16
558,804.50
392,635.87
590,135.25
735,573.41
28,407.50
31,430.00
35,305.00
126,195.00
252,555.00
355,320.00
16,917.50
18,467.50
21,567.50
35,257.50
40,295.00
58,447.50
77,822.50
110,760.00
333,975.00
168,162.50
76,562.50
56,325.00

9,695,700.00
86,200.00
76,700.00
67,200.00
65,700.00
122,950.00
318,200.00
417,200.00
Analisa PB Memasang 1 Set Daun Pintu double Kaca Tempered tb. 12 mm
Floor hinge Besar Bh 2.0000 500,000.00
Handle stainles steel Bh 4.0000 150,000.00
Bevel noise sudut kaca Set 1.0000 475,000.00
Kaca clear tempered t 12 mm M2 3.7800 650,000.00
Kunci tanam pada kaca ( include ) Bh 2.0000 450,000.00
Jasa pemasangan Ls 1.0000 1,250,000.00
1,000,000.00
600,000.00
475,000.00
2,457,000.00
900,000.00
1,250,000.00
6,682,000.00
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.6500 70,000.00 115,500.00
Tukang Batu L.02 OH 0.2750 90,000.00 24,750.00
Kepala Tukang L.03 OH 0.0280 105,000.00 2,940.00
Mandor L.04 OH 0.0830 115,000.00 9,545.00
JUMLAH TENAGA KERJA 152,735.00
B BAHAN
Semen portland kg 326.0000 1,360.00 443,360.00
Pasir beton (kg) kg 760.0000 235.71 179,142.86
Koral beton (kg) kg 1,029.0000 301.67 310,415.00
Air Liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 954,417.86
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,107,152.86
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan (D+E) 1,107,152.86
DAFTAR HARGA SATUAN

No Uraian Satuan Harga Upah (Rp) Keterangan


A HARGA UPAH :
1 Ahli Bor Hari 110,000.00
2 Kepala Tukang Hari 105,000.00
3 Mandor Hari 115,000.00
4 Mekanik Hari 115,000.00
5 Operator Terlatih Hari 125,000.00
6 Pekerja Hari 70,000.00
7 Pekerja tak Terlatih Hari 90,000.00
8 Pembantu Operator Hari 70,000.00
9 Pembantu Mekanik Hari 70,000.00
10 Pembantu Sopir Hari 75,000.00
11 Penjaga Malam Hari 58,300.00
12 Sopir Terlatih Hari 90,000.00
13 Instalatur Listrik Hari 90,000.00
14 Asisten Instalatur Listrik Hari 90,000.00
15 Tukang Hari 90,000.00
16 Tukang Anyam, Las Hari 90,000.00
17 Tukang Batu Hari 90,000.00
18 Tukang Besi Hari 90,000.00
19 Tukang Cat Hari 90,000.00
20 Tukang Erection Hari 90,000.00
21 Tukang Kayu Hari 90,000.00
22 Tukang Khusus Allumunium Hari 90,000.00
23 Tukang Las Biasa Hari 90,000.00
24 Tukang Las Konstruksi Hari 90,000.00
25 Tukang Pipa Hari 90,000.00
26 Tukang Vibrator Hari 90,000.00

Harga Bahan (Rp)


No Uraian Satuan
Sebelum Pajak
B HARGA BAHAN :
1 Abu Batu 0-0,5 cm M3 335,700.00
2 Accessories listrik Set 10,925.00
3 Additive / Superplasticizer Liter 51,750.00
4 Additive Anti Pengelupasan kg 57,500.00
5 Agregat Halus untuk Base M3 295,200.00
6 Agregat Halus ( 10 - 20 mm ) untuk Lapen/Hotmix M3 338,862.45
7 Agregat Kasar untuk Base M3 271,012.45
8 Agregat Kasar ( 20-30 mm & 30-50 mm ) untuk M3 305,262.00
9 Agregat Pecah Mesin 0-5 mm M3 335,700.00
10 Agregat Pecah Mesin 20-30 mm M3 305,200.00
11 Agregat Pecah Mesin 5-10 & 10-20 mm M3 338,862.45
12 Air Liter 100.00
13 Akustik 30 x 30 cm lbr 11,000.00
14 Akustik 30 x 60 cm lbr 19,000.00
15 Akustik 60 x 120 cm lbr 71,500.00
16 Alang - alang Ikat 2,500.00
17 Alumunium Gelombang lbr
18 Alumunium Strip M 26,000.00
19 Alumunium foil 1,2x50 m singgleside M2 5,250.00
20 Alumunium foil 1,2x50 m doubleside M2 8,650.00
21 Amplas Lembar 7,000.00
22 Anchorage kg 1,260,000.00
23 Angker Bolt (20 kg) Buah 26,000.00
24 Anti Strpping Agent Liter 27,600.00
25 Arbocell Kg. 40,250.00
26 Asbes Gelombang (180x 80 x 0,35) cm Lembar 28,500.00
27 Asbes Gelombang (210x105x0,4) cm Lembar 57,000.00
28 Asbes Gelombang (240x80x0,35) cm Lembar 40,000.00
29 Asbes Gelombang 2,25 x 0.92 m x 5 mm Lembar 64,400.00
30 Asbes Gelombang 2.00 x 0.92 m x 5 mm Lembar 50,600.00
31 Asbes Gelombang 1.80 x 0.92 m x 5 mm Lembar 50,000.00
32 Asbes Gelombang 3.00 x 1.05 m x 4 mm Lembar 81,000.00
33 Asbes Gelombang 2.70 x 1.05 m x 4 mm Lembar 72,000.00
34 Asbes Gelombang 2.40 x 1.05 m x 4 mm Lembar 65,000.00
35 Asbes Gelombang 2.10 x 1.05 m x 4 mm Lembar 57,000.00
36 Asbes Gelombang 1.50 x 1.05 m x 4 mm Lembar 45,000.00
37 Asbes Gelombang 3.00 x 1.08 m x 6 mm Lembar 121,900.00
38 Asbes Gelombang 2.70 x 1.08 m x 6 mm Lembar 83,950.00
39 Asbes Gelombang 2.40 x 1.08 m x 6 mm Lembar 97,500.00
40 Asbes Gelombang 2.10 x 1.08 m x 6 mm Lembar 69,000.00
41 Asbes Gelombang 1.80 x 1.08 m x 6 mm Lembar 56,350.00
42 Asbes Semen M2 21,200.00
43 Aspal Emulsi Kg 11,110.00
44 Aspal Semen Kg 11,870.00
45 Aspal Semen Ton 11,870.00
46 Assetilline Botol 264,500.00
47 Atap Spandek Polos Lbr 350,000.00
48 Atap Spandek Warna Lbr 450,000.00
49 Bahan Modifikasi kg 8,000.00
50 Bahan pengawet: kreosot liter 11,500.00
51 Baja Bergelombang Kg 12,500.00
52 Baja Prategang kg 25,000.00
53 Baja Struktur Kg 13,000.00
54 Bak Cuci piring Satinles Steel 1 lubang Buah 225,000.00
55 Bak Mandi Fiber 1 M3 Buah 700,000.00
56 Bak Mandi Fiber 0,3 M3 Buah 250,000.00
57 Bak Mandi Plastik Buah 200,000.00
58 Bak porselen Buah 2,200,000.00
59 Bambu, Panjang 4m dia 100 mm Batang 9,000.00
60 Batako Buah 4,000.00
61 Bata Rooster Buah 8,500.00
62 Batu Apung Kg 25,000.00
63 Batu Bara Kg 600.00
64 Batu bata Buah 430.00
65 Batu Belah Hitam Utk Pondasi M3
66 Batu Belah Hitam 25/30 Cm M3 404,000.00
67 Batu Belah Hitam 0,5/1 Cm (Screening) M3 335,700.00
68 Batu Belah Hitam 10/15 Cm M3 246,400.00
69 Batu Belah Hitam 15/20 Cm M3 246,400.00
70 Batu Belah Hitam 1/2 Cm (Split) M3 338,862.45
71 Batu Belah Hitam 2/3 Cm (Split) M3 305,262.00
72 Batu Belah Hitam 3/5 Cm (Split) M3 305,262.00
73 Batu Belah Hitam 5/7 Cm (Gravel) M3 265,262.45
74 Batu Muka M2 78,500.00
75 Batu Palimanan M2 149,500.00
76 Bathcuip porselen buah 1,750,000.00
77 Baut Baja Ringan 10 x 16 Dus 82,500.00
78 Baut Baja Ringan 10 x 19 Dus 73,700.00
79 Bentonit Kg 7,000.00
80 Besi Baja IWF Kg 18,500.00
81 Besi Beton (Polos/Ulir) Kg 18,500.00
82 Besi Beton Ulir Kg 18,500.00
83 Besi Bulat st 60 Kg 18,500.00
84 Besi Canal Kg 18,500.00
85 Besi Hollow 50.50.3 Kg 13,000.00
86 Besi Hollow 4/4 btg 25,300.00
87 Besi Hollow 2/4 btg 19,800.00
88 Besi Profil Kg 13,000.00
89 Batu Paras M2 78,500.00
90 Besi plat 1 mm M2 175,000.00
91 Besi plat 1,2 mm M2 245,000.00
92 Besi Siku Kg 13,000.00
93 Besi Strip Kg 13,000.00
94 Bibit Pohon ( tinggi 1 m ) Buah 64,500.00
95 Bilik Bambu M2 40,250.00
96 Blockboard (122x244x1,8) Lbr 215,000.00
97 Box panel PVC isi 4 MCB bh 180,000.00
98 Box Zekering/ Termis 2 Group Buah 110,000.00
99 Box Zekering/ Termis 3 Group Buah 145,000.00
100 Bubungan Asbes 80 cm Lbr 27,000.00
101 Bubungan Bulat Genteng Zincalume pasir M 63,250.00
102 Bubungan Bulat Genteng Zincalume polos M 49,500.00
103 Bubungan asbes gelombang 0,92 Buah 12,500.00
104 Bubungan asbes gelombang 1,05 Buah 15,000.00
105 Bubungan asbes gelombang 1,08 Buah 17,500.00
106 Bubungan Genteng Kodok Buah 3,200.00
107 Bubungan Genteng Kramik/Glasur Buah 12,000.00
108 Bubungan Genteng Mantili Buah 3,450.00
109 Bubungan Genteng Plentong Buah 4,600.00
110 Bubungan karpet M 9,000.00
111 Bubungan Pinggir Genteng Zincalume polos M 26,400.00
112 Buisde 1/2 lingk. dia. 20 cm Buah 35,000.00
113 Buisde 1/2 lingk. dia. 30 cm Buah 40,000.00
114 Buisde 1/2 lingk. dia. 50 cm Buah 90,000.00
115 Buisde dia. 20 cm Buah 60,000.00
116 Buisde dia. 30 cm Buah 70,000.00
117 Buisde dia. 50 cm Buah 175,000.00
118 Buisde dia. 100 cm Buah 550,000.00
119 Buisde dia. 100 cm + Tulangan Buah 600,000.00
120 Bunker Oil Liter 5,000.00
121 Cat Alkali kg 39,500.00
122 Cat Anti Karat kg 42,500.00
123 Cat Antara kg 46,800.00
124 Cat Dasar Kg 17,500.00
125 Cat Epoxy Kg 75,000.00
126 Cat Penutup Kg 22,000.00
127 Cat Penutup Eksterior Kg 90,000.00
128 Cat Genteng Kg 32,000.00
129 Cat Kayu/Besi Kg 47,500.00
130 Cat Marka (non Thermoplas) Kg 70,000.00
131 Cat Marka (Thermoplas) Kg 95,000.00
132 Cat Meni kayu Kg 25,000.00
133 Cat Meni kayu/besi Kg 25,000.00
134 Cat Taman Kg 86,000.00
135 Cat Tembok Kg 22,000.00
136 Cerucuk M 35,000.00
137 Compound Kg 4,000.00
138 Conblock HB-20 Buah 3,500.00
139 Conblock HB-15 Buah 4,500.00
140 Conblock HB-10 Buah 5,500.00
141 Cotton Plaster Kg 65,000.00
142 Chek Valve 11/4" Buah 176,000.00
143 Chek Valve 11/2" Buah 220,000.00
144 Cherlag Kg 68,300.00
145 Clemp Sadle dia 2" Buah 31,600.00
146 Clemp Sadle dia 3" Buah 44,200.00
147 Clemp Sadle dia 4" Buah 56,900.00
148 Curing Compound Liter 43,000.00
149 Dempul Kayu Kg 35,000.00 Impra
150 Dempul Tembok Kg 15,000.00
151 Dinabolt dia 12mm (10-15cm) Bh 5,000.00
152 Doble Nepel 1/2" Buah 6,820.00
153 Doble Nepel 3/4" Buah 9,020.00
154 Doble Nepel 1" Buah 12,650.00
155 Doble Nepel 1" Buah 12,650.00
156 Dolken kayu φ(8-10) Batang 25,000.00
157 Door closer Buah 155,000.00
158 Door Holder Buah 175,000.00
159 Door Holder Alumunium+Label set 40,000.00
159 Door Stop Buah 55,000.00
160 Dop 2"AW Buah 6,050.00
161 Dop 3"AW Buah 18,920.00
162 Dop 4" PVC Buah 40,480.00
163 Dop 6" PVC Buah 69,630.00
164 Down light / PLC 13 W bh 33,000.00
165 Elastomer M 230,000.00
166 Elastomer Alam Kg 17,250.00
167 Elastomer Sintesis Kg 34,500.00
168 Engsel Angin Casement Buah 25,000.00
169 Engsel Jendela Buah 15,000.00
170 Engsel Pintu Buah 20,000.00
171 Eternit (240 x 120 x 0,3)cm M2 45,200.00
172 Expansion Cup m2 10,000.00
173 Filler Kg 1,200.00
174 Fitting plafond + lampu bh 45,000.00 Panasonic
175 Formwork Plate m2 575,000.00
176 Formika lbr 100,000.00
177 Floor Hardener Kg 14,256.00
178 Floor Hinges+Door Strap set 1,450,000.00
179 Floor Drain bh 45,000.00
180 Gebalan Rumput M2 18,500.00
181 Gembok Buah 75,000.00
182 Generator Set Kap. 5000 Watt + Panel Lengkap Unit 7,500,000.00
183 Genteng Aspal Buah 20,000.00
184 Genteng Beton Glasur Buah 6,500.00
185 Genteng Beton Buah 6,500.00
186 Genteng Keramik warna Standard Buah 14,500.00
187 Genteng Kodok Buah 800.00
188 Genteng Mantili Buah 1,100.00
189 Genteng Plentong besar Buah 3,750.00
190 Genteng Plentong kecil Buah 1,350.00
191 Genteng Metal Zincalume pasir M2 76,625.00
192 Genteng Metal Zincalume polos M2 50,650.00
193 Geotextile M2 17,800.00
194 Glass Bead Kg 22,500.00
195 Glass Block Buah 22,500.00
196 Granit 40 x 40 cm Buah 162,000.00
197 Grendel Jendela Buah 15,000.00
198 Grendel Jendela/Rambuncis bh 20,000.00
199 Grendel Pintu Panjang Buah 50,000.00
200 Grendel Pintu tanam Buah 60,000.00
201 Grendel Pintu tanam alumunium Buah 25,000.00
202 Gymfloor M2 150,000.00
203 Gypsum Lembar 70,000.00
204 Hak Angin / pengkait Buah 25,000.00
205 Harplek 1 x 1 m M2 22,000.00
206 Hidran Umum Kap. 3 m3 Buah 5,660,000.00
207 Ijuk m3 25,000.00
208 Isolasi bh 5,000.00
209 Jembatan Rangka Baja Kg 35,100.00
210 Jendela Nako M 65,000.00
211 Joint Filler m' 34,500.00
212 Kabel Listrik NYA 1 x 1,5 mm Rol 195,000.00 175,000.00
213 Kabel Listrik NYA 1 x 2,5 mm Rol 280,000.00 280,000.00
214 Kabel Listrik NYM 2 x 1,5 mm Rol 328,000.00 275,000.00
215 Kabel Listrik NYM 2 x 2,5 mm Rol 470,000.00 395,000.00
216 Kabel Listrik NYM 3 x 2,5 mm M' 495,000.00 500,000.00
217 Kabel Pompa dia= 2,5 mm x 3 M' 16,500.00
218 Kabel telephone 4 x 0.5 mm m' 2,000.00
219 Kaca Bening 3 mm M2 70,000.00
220 Kaca Bening 5mm M2 87,500.00
221 Kaca Bening 8mm M2 215,000.00
222 Kaca Cermin 5mm M2 150,000.00
223 Kaca Cermin 8mm M2 300,000.00
224 Kaca Es 3 mm M2 110,000.00
225 Kaca Patri 5 mm M2 160,000.00
226 Kaca Ribben/Buram Uk. 3 mm M2 95,000.00
227 Kaca Ribben/Buram Uk. 5 mm M2 120,000.00
228 Kaca Ribben/Buram Uk. 8 mm M2 295,000.00
229 Kaca Tempered Uk. 8 mm M2 546,000.00
230 Kaca Tempered Uk. 12 mm M2 650,000.00
231 Kaca Wireglass Tebal 5 mm M2 510,000.00
232 Kalkarium Kg 100,000.00
233 Kanstin Cetak 30 cm Buah 15,000.00
234 Kapur M3 180,000.00
235 Kapur sirih Kg 7,500.00
236 Karpet M2 15,000.00
237 kawat Beton Kg 14,250.00
238 Kawat Beton Kg 14,250.00
239 Kawat Bronjong Kg 16,100.00
240 Kawat Dia 4mm Kg 15,000.00
241 Kawat Duri Kg 15,350.00
242 Kawat Harmonika M2 15,000.00
243 Kawat Las Kg 28,000.00 26,400.00
244 Kawat Las / Electroda Dus 132,000.00 26,400.00
245 Kawat Nyamuk M2 18,000.00
246 Kawat Seling Baja 3/8" M 38,000.00
247 Kayu Acuan M3 1,575,000.00
248 Kayu Bakar M3 305,128.00
249 Kayu Balok kelas I M3 9,752,500.00 Merbau
250 Kayu Balok kelas II M3 4,125,000.00 Meranti
251 Kayu Balok kelas III M3 2,125,000.00 Gelam, Waru gunung
252 Kayu Balok kelas IV M3 1,575,000.00 Sengon,akasia
253 Dolken kayu φ(8-10) Batang 25,000.00
254 Kayu kasau kelas I M3 8,000,000.00 Merbau
255 Kayu kasau kelas II M3 3,500,000.00 Meranti
256 Kayu kasau kelas III M3 2,125,000.00 Bayur,Gelam
257 Kayu kasau kelas IV M3 1,575,000.00 sengon
258 Kayu papan kelas I M3 10,250,000.00 Merbau
259 Kayu papan kelas II M3 4,000,000.00 Meranti
260 Kayu papan kelas III M3 2,400,000.00 Cempaka,
261 Kayu papan kelas IV M3 1,750,000.00 kemiri
262 Kayu perancah/begisting M3 1,575,000.00 sengon
263 Kayu reng 2/3 kelas II M3 3,500,000.00
264 Kayu reng 2/3 kelas III M3 2,600,000.00
265 Keramik 20/20 Polos bh 2,500.00 20.00
266 Keramik 20/20 Warna bh 2,800.00
267 Keramik 20/25 Polos bh 3,500.00
268 Keramik 20/25 Warna bh 4,250.00
269 Keramik 20/40 Warna bh 10,000.00
270 Keramik 30/60 Warna bh 22,500.00
271 Keramik 30/30 Polos bh 6,000.00 6.25
272 Keramik 30/30 Warna bh 6,018.18
273 Keramik 30/30 kasar bh 6,500.00
274 Keramik 40/40 Polos bh 12,000.00
275 Keramik 40/40 Warna bh 15,000.00
276 Keramik 50/50 Polos bh 20,625.00
277 Keramik 50/50 Warna bh 30,000.00
278 Keramik 60/60 Warna (Polished) Buah 97,200.00
279 Keramik 80/80 Warna (Polished) Buah 256,000.00
280 Keramik Mozaik 30X30 Cm Buah 60,000.00
281 Keramik Plin 10 x 30 cm Buah 3,700.00
282 Keramik Plin 10 x 40 cm Buah 4,200.00
283 Keramik Plin 10 x 50 cm Buah 6,000.00
284 Keramik Plin 10 x 60 cm Buah 16,200.00
285 Keramik Plin 10 x 80 cm Buah 32,000.00
283 Keramik Plin 10 x 20 cm Buah 3,300.00
284 Keramik Plin 10 x 10 cm Buah 1,650.00
285 Keramik Plin 5 x 20 cm Buah 1,650.00
286 Kerb jenis 1 Buah 28,750.00
287 Kerb jenis 2 Buah 34,500.00
288 Kerb jenis 3 Buah 40,250.00
289 Kerb Type A Buah 28,750.00
290 Kerikil M3 271,012.45
291 Kerosen / Minyak Tanah Liter 8,800.00
292 Klem Pipa PVC Ø 1" Buah 850.00
293 Klem Pipa PVC Ø 1/2" Buah 650.00
294 Klem Pipa PVC Ø 3" Buah 3,000.00
295 Klem Pipa PVC Ø 3/4" Buah 1,500.00
296 Klem Pipa PVC Ø 4" Buah 4,000.00
297 Kloset Duduk Keramik (Natural) Buah 2,250,000.00
298 Kloset Jongkok Porselin Buah 280,000.00
299 Kloset Jongkok Teraso Buah 150,000.00
300 Knee "L" PVC Buah 5,300.00
301 Knee "L" PVC Ø 1/2" Buah 4,200.00
302 Knee "L" PVC Ø 2" Buah 7,900.00
303 Knee "L" PVC Ø 3" Buah 6,000.00
304 Knee "L" PVC Ø 3/4" Buah 28,000.00
305 Knee "L" PVC Ø 4" Buah 60,000.00
306 Knie GIP Ø 1" Buah 11,000.00
307 Knie GIP Ø 1/2" Buah 6,000.00
308 Knie GIP Ø 2" Buah 29,400.00
309 Knie GIP Ø 3/4" Buah 7,000.00
310 Knie PVC 1/2" Buah 3,000.00
311 Knie PVC 3/4" Buah 3,000.00
312 Knie PVC Ø 1" Buah 6,300.00
313 Knie PVC Ø 2" Buah 16,800.00
314 Kolom Pagar beton pracetak Btg 195,000.00
315 Koral beton m3 543,000.00
316 Koral beton (kg) Kg 301.67
317 Kran air besi Ø 1/2" Buah 35,000.00
318 Kran air besi Ø 3/4" Buah 38,400.00
319 Kran zink bh 75,000.00
320 Kuku macan M' 7,000.00
321 Kunci Slot Buah 50,500.00
322 Kunci Silinder Buah 125,000.00
323 Kunci Lemari Buah 15,000.00
324 Kunci tanam antik Buah 315,000.00
325 Kunci tanam biasa Buah 145,000.00
326 Kunci tanam alumunium Buah 135,000.00
327 Kunci tanam kaca frameless Buah 550,000.00
328 Kunci pintu kamar mandi Buah 50,000.00
329 Kusen Almunium 3"(silver) M' 55,000.00
330 Kusen Almunium 3"(coklat/hitam) M' 65,000.00
326 Kusen Almunium 4"(silver) M' 80,000.00
329 Kusen Almunium 4"(coklat/hitam) M' 95,000.00
330 Kuas cat Buah 18,500.00
331 Lampu Down Light Buah 72,500.00
332 Lampu Hias/sorot Buah 95,000.00
333 Lampu Pijar 25 Watt Buah 7,500.00
334 Lampu Pijar 40 Watt Buah 15,000.00
335 Lampu SL 18 Watt Buah 40,250.00
336 Lampu TL 20 Watt Buah 45,000.00
337 Lampu RM 300 TL 2 x 18 W Divider Buah 250,000.00
338 Lampu RM 300 TL 2 x 36 W Divider Buah 340,000.00
339 Lantai kerja tebal 10cm M3 500,000.00
340 Latasir di AMP (Material Hotmix) Ton 1,095,700.00
341 Lem Plastik / Kayu Kg 15,000.00 20,000.00
342 Lem PVC Buah 8,400.00
343 Lis Gypsum M' 12,000.00
344 Lis Gibsum 10 cm M' 18,900.00
345 Lis Gibsum 15 cm M' 21,000.00
346 Lis Gibsum 5 cm M' 14,700.00
347 Lis Gibsun 20 cm M' 28,400.00
348 List Plafond PVC M 26,250.00
349 List Plafond Propil 4 cm M' 6,500.00
350 List kayu 2/4 cm M' 1,750,000.00
351 Listplank GRC 20 cm M' 15,625.00
352 Listplank Zincalume 24 cm M' 75,200.00
351 Mangkokan listrik (Durados) Buah 5,300.00
352 Marmer 30/30 M2 187,500.00
353 Marmer 40/40 M2 285,700.00
354 Marmer 50/50 M2 325,700.00
355 Marmer 60/60 M2 350,700.00
356 Marmer 100/100 cm M2 400,000.00
357 Marmer Plint 10 x 30 cm Buah 16,500.00
358 Marmer Plint 10 x 40 cm Buah 19,800.00
359 Marmer Plint 10 x 60 cm Buah 22,500.00
360 Material Tanah Timbunan M3 115,000.00
361 Matras Concrete Buah 460,000.00
362 MCB 4 A bh 35,000.00 Legran
363 MCB 6 A bh 45,000.00 Legran
364 Meni Kayu/Besi Kg 25,000.00
365 Mikro Pile 16x16x16 M1 74,750.00
366 Mini Timber Pile Buah 35,000.00
367 Minyak Begisting Liter 5,175.00
368 Minyak bekisting Liter 5,175.00
369 Minyak Cat / Thinner Liter 20,000.00
370 Minyak Fluks Liter 21,735.00
371 Minyak pelumas / Oli Liter 34,000.00 26,400.00
372 Mortar M3 500,000.00
373 Multiplek 12 mm Lembar 157,500.00
374 Mur Baut 1/2", 5/8", 7/8" Kg 18,900.00
375 Nok Genteng Aspal Buah 9,000.00
376 Nok genteng beton Buah 7,800.00
377 Nok Stell Rata 0,92 Lembar 27,300.00
378 Nok Stell Rata 1,05 Lembar 34,000.00
379 Otomatis Pompa Unit 126,000.00
380 Outlet Telephone bh 43,575.00
381 Outlet TV bh 43,575.00
382 Over Sock GIP Ø 3/4" x Ø 1/2" Buah 7,400.00
383 Overshock PVC Ø 2" x Ø 1½" Buah 8,400.00
384 Overshock PVC Ø 3" x Ø 2" Buah 12,100.00
385 Oxygen Botol 115,000.00
386 Paku 1 - 5 cm Kg 12,000.00
387 Paku 5 – 10 cm Kg 12,000.00
388 Paku Asbes Kg 21,000.00
389 Paku Cacing Kg 22,000.00
390 Paku GRC Kg 25,200.00
391 Paku Gypsum Kg 21,000.00
392 Paku Jalan Buah 24,150.00
393 Paku Keling 3/4", 5/8", 7/8" Kg 13,200.00
394 Paku Sekrup (50 Bh / Kg) Kg 15,180.00
395 Paku Skrup bh 303.60
396 Paku Seng (100 Bh / Kg) Kg 21,000.00
397 Paku Triplek Kg 25,000.00
398 Panel Pagar Beton Pracetak Lbr 105,000.00
399 Panel Pompa Unit 3,500,000.00
400 Papan GRC Lembar 57,200.00
401 Parquet Kayu M2 230,000.00
402 Pasir beton M3 330,000.00
403 Pasir beton (kg) Kg 235.71
404 Pasir Pasang M3 320,000.00
405 Pasir Urug M3 140,000.00
406 Paving Block T = 6 Cm Buah 1,650.00
407 Paving Block T = 8 Cm Buah 1,818.00
408 PC-Grider K-500; L=25 m; h = 160 cm Unit 202,432,000.00
409 Pelat Baja/Besi Profil Kg 13,000.00
410 Pelat Rambu (Eng. Grade) BH 250,000.00
411 Pelat Rambu (High I. Grade) BH 300,000.00
412 Pemantul Cahaya (Reflector) Bh. 17,250.00
413 Penangkal Petir Unit 2,887,500.00
414 Pengelasan cm 3,854.37
415 Pengencer/thinner Kg 20,000.00
416 Penjaga Jarak Begisting / Spacer buah 20,000.00
417 Perletakan Logam Buah 287,500.00
418 Perancah kayu m3 1,800,000.00
419 Pintu Fibber KM Buah 378,000.00
420 Pipa Baja Kg 21,800.00
421 Pipa Beton Ø 20 Cm Bh 45,000.00
422 Pipa Beton Ø 100 Cm Bh 425,000.00
423 Pipa Galvanis Ø 1" M' 12,500.00
424 Pipa Galvanis Ø 1/2" M' 8,050.00
425 Pipa Galvanis Ø 1½" M' 58,400.00
426 Pipa Galvanis Ø 2" M' 100,000.00
427 Pipa Galvanis Ø 2 1/2" M' 125,000.00
428 Pipa Galvanis Ø 3" M' 141,700.00
429 Pipa Galvanis Ø 3/4" M' 10,000.00
430 Pipa Galvanis Ø 4" M' 208,000.00
431 Pipa Galvanis Ø 6" M' 366,700.00
432 Pipa Galvanis Ø 8" M' 450,000.00
433 Pipa Galvanis Ø 10" M' 564,213.20
434 Pipa Galvanis Ø 12" M' 678,426.40
435 Pipa Galvanis Ø 16" M' 906,852.79
436 Pipa Galvanis Ø 18" M' 1,021,065.99
437 Pipa Galvanis Ø 20" M' 1,135,279.19
438 Pipa Galvanis Ø 24" M' 1,363,705.58
439 Pipa Galvanis Ø 28" M' 1,592,131.98
440 Pipa Galvanis Ø 32" M' 1,820,558.38
441 Pipa Galvanis Ø 36" M' 2,048,984.77
442 Pipa Galvanis Ø 40" M' 2,277,411.17
443 Pipa Galvanis Ø 44" M' 2,505,837.56
444 Pipa Galvanis Ø 48" M' 2,734,263.96
445 Pipa Galvanis Ø 1/2" SCH-40 M' 16,666.67
446 Pipa Galvanis Ø 3/4" SCH-40 M' 22,500.00
447 Pipa Galvanis Ø 1" SCH-40 M' 32,500.00
448 Pipa Galvanis Ø 1 1/2" SCH-40 M' 52,500.00
449 Pipa Galvanis Ø 2" SCH-40 M' 70,000.00
450 Pipa Galvanis Ø 2 1/2" SCH-40 M' 110,833.33
451 Pipa Galvanis Ø 3" SCH-40 M' 144,166.67
452 Pipa Galvanis Ø 4" SCH-40 M' 216,666.67
453 Pipa Galvanis Ø 6" SCH-40 M' 366,666.67
454 Pipa Holow M' 60,000.00 Utk rangka plafond
455 Pipa HPDE Ø 63mm M' 39,800.00
456 Pipa HPDE Ø 100mm M' 81,000.00
457 Pipa HPDE Ø 125mm M' 155,000.00
458 Pipa HPDE Ø 150mm M' 193,000.00
459 Pipa HPDE Ø 200mm M' 395,000.00
460 Pipa HPDE Ø 250mm M' 615,000.00
461 Pipa HPDE Ø 300mm M' 977,000.00
462 Pipa HPDE Ø 400mm M' 1,573,000.00
463 Pipa HPDE Ø 450mm M' 1,993,000.00
464 Pipa HPDE Ø 500mm M' 2,458,000.00
465 Pipa HPDE Ø 600mm M' 3,900,000.00
466 Pipa Porus M' 50,000.00
467 Pipa PVC Ø 1" M' 8,250.00
468 Pipa PVC Ø 1,5" M' 14,250.00
469 Pipa PVC Ø 1/2" M' 5,250.00
470 Pipa PVC Ø 2" M' 17,500.00
471 Pipa PVC Ø 2 1/2" M' 25,000.00
472 Pipa PVC Ø 3" M' 37,500.00
473 Pipa PVC Ø 3/4" M' 6,250.00
474 Pipa PVC Ø 4" M' 58,750.00
475 Pipa PVC Ø 6" M' 131,250.00
476 Pipa PVC Ø 8" M' 218,750.00
477 Pipa PVC Ø 10" M' 300,000.00
478 Pipa PVC Ø 12" M' 412,500.00
479 Pipa PVC Ø 16" M' 535,250.00
480 Pipa PVC Ø 20" Batang 2,443,000.00
481 Pipa Tanah Ø 20cm Batang 162,500.00
482 Pipa Tanah Ø 15cm Batang 100,000.00
482 Pipa Screen Diameter 4" M 583,300.00
483 Pipa Screen Diameter 6" M 1,066,700.00
484 Porselen 11 x 11 cm Buah 1,200.00
485 Porselen 10 x 20 cm Buah 1,750.00
486 Porselen 20 x 20 cm Buah 3,500.00
487 Plamir kayu / besi Kg 18,000.00
488 Plamir Tembok Kg 15,000.00
489 Plan Deck tebal 7 cm K-350 Unit 678,000.00
490 Plastik Filter M2 13,340.00
491 Plat 400 x 300/3 Batang 42,000.00
492 Plat mur, Plong, baut / Begel U Kg 18,900.00
493 Plat Perletakan bh 65,000.00
494 Plat Sudut bh 25,000.00
495 Plapond PVC board Lbr 250,000.00
496 Politur Jadi Liter 53,000.00
497 Politur Liter 55,000.00
498 Plywood 9 mm Lembar 123,000.00
499 Plywood 6 mm Lembar 75,000.00
500 Plywood 3 mm Lembar 42,800.00
501 Plywood 4 mm Lembar 65,000.00
502 Plywood tebal ( 240 x 120 x 0,9 ) cm Lembar 123,000.00
503 Polimer kg 51,750.00
504 Polytane 125 micron kg 25,000.00
505 Pompa sentrifugal (SH=7m ; Max FR= 20-220 ltr/min) Unit 3,500,000.00
506 Premium Ltr 7,975.00
507 Profil Allum"T" M 25,200.00
508 Profil Allumunium M 37,500.00
509 Profil Jendela Alumunium M 90,000.00
510 Profil Pintu Alumunium M 110,000.00
511 Profil Kaca M 7,500.00
512 Profil U.85-06 btg 87,000.00
513 Profil Reng RT. 15 btg 52,750.00
512 Pupuk Kg 8,050.00
513 Phenol film 12mm L br 20,000.00
514 Ramset buah 14,950.00
515 Reducer PVC 4" - 6" Buah 32,000.00
516 Reducer PVC 4" - 6" Buah 32,000.00
517 Rel Pengaman M' 600,000.00
518 Rel Pintu Dorong Bh 235,000.00
519 Reng Lapis Zincalume t=0,45 M 36,000.00
520 Rooflight 90x180 Lbr 75,000.00
521 Rolling Door Besi M2 375,000.00
522 Rolling Door Allumunium M2 550,000.00
523 Folding Gate Besi M2 750,000.00
524 Roster Beton 15/20 Buah 40,000.00
525 Rumput Gajah Australia M2 32,500.00
526 Rumput Gajah biasa M2 18,500.00
527 Rumput Gajah mini M2 45,000.00
528 Rumput Golf M2 35,000.00
529 Sirtu M3 207,000.00
530 Sabun Kg 10,000.00
531 Saklar Double kualitas baik Buah 33,500.00
532 Saklar Single kualitas baik Buah 24,000.00
533 Saklar Triple kualitas baik Buah 43,000.00
534 Saringan Air / Floor Drain Buah 75,000.00
535 Sealant Tube 25,000.00
536 Seal tape Buah 3,500.00
537 Selinder Buah 242,000.00 type 08510 ex. Cisa
538 Semen PC (50 Kg) Zak 68,000.00
539 Semen portland Kg 1,360.00
540 Semen Putih (50 Kg) Zak 95,000.00
541 Semen Grouting Kg 5,220.00
542 Semen warna Kg 12,000.00
543 Seng Alumunium M2 48,000.00
544 Seng BJLS 35" M2 26,600.00
545 Seng Bubungan 0,92 Lembar 27,300.00
546 Seng Bubungan 1,05 Lembar 34,000.00
547 Seng Bubungan 1,08 Lembar 35,000.00
548 Seng Gelombang Lembar 39,000.00
549 Seng Gelombang BJLS 27 Lembar 37,800.00
550 Seng Gelombang BJLS 30 Lembar 39,900.00
551 Seng Plat BJLS 27 Lembar 37,900.00
552 Seng Plat BJLS 30 Lembar 39,400.00
553 Seng Rata Lembar 16,000.00
554 Septicktank dan Peresapan Unit 2,887,500.00
555 Shockdrat dalam PVC Ø 3" Buah 25,000.00
556 Shockdrat dalam PVC Ø 3/4" Buah 2,600.00
557 Shockdrat dalam PVC Ø 4" Buah 28,900.00
558 Shockdrat luar Galvanis Ø 1" Buah 18,500.00
559 Shockdrat luar Galvanis Ø 1/2" Buah 14,500.00
560 Shockdrat luar Galvanis Ø 4" Buah 57,750.00
561 Shockdrat luar PVC Diameter 2" Buah 18,000.00
562 Shockdrat luar PVC Diameter 3/4" Buah 3,500.00
563 Shower Set unt 472,500.00 type TX 423 SZ ex. Toto
564 Shower Spray unt 181,000.00 type THX 20 NBPIV ex. Toto
565 Sirap Kayu 3mm Lbr 8,571.43
566 Skrup Fixer Buah 500.00
567 Sirtu / Krokos M3 207,000.00
568 Slot Tanam Buah 85,000.00
569 Sock 1/2" GIP Buah 3,800.00
570 Sock 3/4" GIP Buah 11,000.00
571 Sock 1" GIP Buah 7,100.00
572 Sock 2" GIP Buah 16,500.00
573 Sock 1/2" PVC Buah 2,500.00
574 Sock 3/4" PVC Buah 3,000.00
575 Sock 1" PVC Buah 3,500.00
576 Sock 2" PVC Buah 6,000.00
577 Sock derat dalam GIP 2" Buah 17,000.00
578 Sock derat dalam PVC 3/4" Buah 3,500.00
579 Sock derat Luar 1/2" Buah 3,000.00
580 Sock derat Luar 3/4" Buah 3,500.00
581 Sock derat Luar 1" Buah 4,000.00
582 Sock derat Luar 1 1/4" Buah 6,000.00
583 Sock derat Luar 2" Buah 12,000.00
584 Soda api Kg 30,000.00
585 Solar Liter 8,013.35
586 Solite Pen/Pengunci Buah 34,500.00
587 Spring knip Buah 25,000.00
588 Stop Kontak Buah 22,500.00
589 Stop Kran 1" Buah 195,000.00
590 Stop Kran 11/4" Buah 199,500.00
591 Stop Kran 2" Buah 404,300.00
592 Stop Kran 3" Buah 589,100.00
593 Stop Kran Ball Valve 3/4" Buah 84,000.00
594 Stop Kran Ball Valve 1/2" Buah 63,000.00
595 Strip Bearing Buah 150,000.00
596 Strorox – 100 Liter 88,500.00
597 Talang Fiber M' 55,000.00
598 Talang jurai dalam Lapis Zinc Alumunium M' 78,750.00
599 Talang karpet M' 18,000.00
600 Tali Ijuk Kg 35,000.00
601 Tambang Plastik 8 mm M' 21,000.00
602 Tanah Timbunan Pilihan M3 115,000.00
603 Tanah Timbunan Biasa M3 28,750.00
604 Tanaman Semak/Perdu M2 25,000.00
605 Tarikan Jendela Buah 15,000.00
606 Teakwood 3 mm Lembar 90,000.00
607 Teakwood 4 mm Lembar 96,100.00
608 Teakwood 5 mm Lembar 125,000.00
609 Teak Oil Ltr 60,000.00
610 TEE 1/2" PVC Buah 3,500.00
611 TEE 3/4" PVC Buah 4,500.00
612 TEE 1" PVC Buah 5,500.00
613 TEE 2" PVC Buah 8,500.00
614 TEE 1/2" GIP Buah 7,400.00
615 TEE 3/4" GIP Buah 10,000.00
616 TEE 1" GIP Buah 30,000.00
617 TEE 2" GIP Buah 30,000.00
618 TEE Over 3" ke 2" PVC Buah 13,700.00
619 TEE Over 2" ke 1" PVC Buah 29,100.00
620 Tempat Sabun bh 44,000.00
621 Ter / Residu Kg 24,400.00
622 Tiang Pancang Dia. 40 cm K-600 Kg/Cm2 Buah 624,000.00
623 Tiang Pancang Dia. 45 cm K-600 Kg/Cm2 M' 594,000.00
624 Tower Air Fiber 0,50 M3 Buah 825,500.00
625 Tower Air Fiber 1,00 M3 Buah 1,435,000.00
626 Tralis Besi M2 280,000.00
627 Traso Plint 10/30 Buah 3,000.00
628 Triplek 3 mm Lembar 42,800.00
629 Triplek 4 mm Lembar 65,000.00
630 Triplek 6 mm Lembar 75,000.00
631 Ubin Abu - Abu 40X40 CM Buah 60,000.00
632 Ubin Abu - Abu 30X30 CM Buah 3,350.00
633 Ubin Abu - Abu 20X20 CM Buah 2,200.00
634 Ubin Abu - Abu Plint 15X20 CM Buah 2,000.00
635 Ubin Abu - Abu Plint 10X30 CM Buah 2,200.00
636 Ubin Abu - Abu Plint 10X40 CM Buah 2,300.00
637 Ubin Granito 30 x 30 cm Buah 15,300.00
638 Ubin Granito 40 x 40 cm Buah 40,000.00
639 Ubin Granito 60 x 60 cm Buah 91,250.00
640 Ubin Granito 80 x 80 cm Buah 288,000.00
641 Ubin Granito Plint 10 x 60 cm Buah 15,208.33
642 Ubin Granito Plint 10 x 80 cm Buah 36,000.00
643 Ubin Granito Plint 10 x 40 cm Buah 10,000.00
644 Ubin Granito Plint 10 x 30 cm Buah 5,100.00
645 Ubin Keramik Artistik 10X20 CM Buah 3,250.00
646 Ubin Keramik Artistik 10X10 CM Buah 2,250.00
647 Ubin Keramik 33X33 CM Buah 6,000.00
648 Ubin Teralux Marmer 40X40 CM Buah 45,000.00
649 Ubin Teralux Marmer 30X30 CM Buah 35,000.00
650 Ubin Teralux Marmer 60X60 CM Buah 65,000.00
651 Ubin Traso 40/40 Buah 6,000.00
652 Ubin Traso 30/30 Buah 4,000.00
653 Ubin Wafel 20/20 Buah 2,000.00
654 Underlayer M2 45,000.00
655 Urinoir Buah 800,000.00
656 Vernis Ltr 55,000.00
657 Vynil M2 95,000.00
658 Wall Paper M' 150,000.00
659 Wastafel Buah 500,000.00
660 Water drain + asesories Set 75,000.00
661 Water Meter 2" Buah 150,000.00
662 Watter Moor 11/4" Buah 28,000.00
663 Watter Moor 11/2" Buah 35,000.00
664 Water Stop 150mm m 74,000.00
665 Water Stop 200mm m 92,650.00
664 Westafel Porselen Buah 500,000.00
665 Wood Filler Kg 34,400.00
DAFTAR SATUAN UPAH KERJA HARIAN

No Uraian Satuan
A HARGA UPAH :
1 Ahli Bor Hari
2 Kepala Tukang Hari
3 Mandor Hari
4 Mekanik Hari
5 Operator Terlatih Hari
6 Operator Hari
7 Pekerja Hari
8 Pekerja tak Terlatih Hari
9 Pembantu Operator Hari
10 Pembantu Mekanik Hari
11 Pembantu Sopir Hari
12 Penjaga Malam Hari
13 Sopir Terlatih Hari
14 Instalatur Listrik Hari
15 Asisten Instalatur Listrik Hari
16 Tukang Hari
17 Tukang Anyam, Las Hari
18 Tukang Batu Hari
19 Tukang Besi Hari
20 Tukang Cat Hari
21 Tukang Erection Hari
22 Tukang Kayu Hari
23 Tukang Khusus Allumunium Hari
24 Tukang Las Biasa Hari
25 Tukang Las Konstruksi Hari
26 Tukang Pipa Hari
27 Tukang Vibrator Hari

DAFTAR SATUAN BAHAN


BIDANG JALAN DAN JEMBATAN

No. URAIAN KODE SATUAN

1 Pasir Beton (Kasar) (M01a) M3


2 Pasir Pasang (Sedang) (M01b) M3
3 Pasir Halus (untuk HRS) (M01c) M3
4 Batu Kali (M02) M3
5 Agregat Kasar ( 20-30 mm & 30-50 mm ) (M03) M3
6 Agregat Halus ( 10 - 20 mm ) (M04) M3
7 Filler (M05) Kg
8 Batu Belah / Kerakal (M06) M3
Batu Belah 10/15 M3
Batu Belah 5/7 M3
9 Gravel (M07) M3
10 Tanah Timbunan Biasa (M08) M3
11 Material Timbunan Pilihan (M09a) M3
(M09) M3
12 Aspal Semen (M10) KG
Ton
13 Kerosen / Minyak Tanah (M11) LITER
14 Semen / PC (50kg) (M12a) Zak
15 Semen / PC (kg) (M12) Kg
16 Besi Beton (M13) Kg
17 Kawat Beton (M14) Kg
18 Kawat Bronjong (M15) Kg
19 Sirtu (M16) M3
20 Cat Marka (Non Thermoplas) (M17a) Kg
21 Cat Marka (Thermoplastic) (M17b) Kg
22 Paku (M18) Kg
23 Kayu Perancah/Begisting (M19) M3
24 Bensin (M20) LITER
25 Solar (M21) LITER
26 Minyak Pelumas / Olie (M22) LITER
27 Plastik Filter (M23) M2
28 Pipa Galvanis Dia. 1.5" (M24) Batang
29 Pipa Galvanis Dia 3" (M24a) M
30 Pipa Galvanis Dia 1,5" (M24b) M
31 Pipa Porus (M25) M'
32 Bahan Agr.Base Kelas A (M26) M3
33 Bahan Agr.Base Kelas B (M27) M3
34 Bahan Agr.Base Kelas S (M27a) M3
35 Bahan Agr.Base Kelas C (M28) M3
36 Bahan Agr.Base Kelas C2 (M29) M3
37 Geotextile (M30) M2
38 Aspal Emulsi (M31) Kg
39 Gebalan Rumput (M32) M2
40 Tanaman Semak/Perdu M2
41 Bibit Pohon ( tinggi 1 m ) Buah
42 Thinner (M33) LITER
43 Glass Bead (M34) Kg
44 Pelat Rambu (Eng. Grade) (M35a) BH
45 Pelat Rambu (High I. Grade) (M35b) BH
46 Rel Pengaman (M36) M'
47 Beton K-250 (M37) M3
48 Baja Tulangan (Polos) U24 (M39a) Kg
49 Baja Tulangan (Ulir) D32 (M39b) Kg
50 Baja Tulangan (Ulir) D39 (M39c) Kg
51 Baja Tulangan (Ulir) D48 (M39d) Kg
52 Kapur (M40) M3
53 Chipping (M41) M3
54 Chipping (kg) (M41a) Kg
55 Cat (M42) Kg
56 Pemantul Cahaya (Reflector) (M43) Bh.
57 Pasir Urug (ada unsur lempung) (M44) M3
58 Arbocell (M45) Kg.
59 Baja Bergelombang (M46) Kg
60 Beton K-125 (M47) M3
61 Baja Struktur (M48) Kg
62 Pelat Baja/Besi Profil (M48a) Kg
63 Tiang Pancang Baja (M49) M'
64 Tiang Pancang Beton Pratekan (M50) M3
65 Kawat Las (M51) Kg
66 Pipa Baja (M52) Kg
67 Minyak Fluks (M53) Liter
68 Bunker Oil (M54) Liter
69 Asbuton Halus (M55) Ton
70 Asbuton yang diproses Kg
71 Baja Prategang (M56) Kg
72 Baja Tulangan (Polos) U32 (M57a) Kg
73 PCI Girder L=17m (M58a) Buah
74 PCI Girder L=21m (M58b) Buah
75 PCI Girder L=26m (M58c) Buah
76 PCI Girder L=32m (M58d) Buah
77 PCI Girder L=36m (M58e) Buah
78 PCI Girder L=41m (M58f) Buah
79 Beton K-300 (M59) M3
80 Beton K-175 (M60) M3
81 Cerucuk (M61) M
82 Tiang Pancang Kayu dia. ...cm M
83 Elastomer (M62) M
84 Elastomer Alam Kg
85 Elastomer Sintesis Kg
86 Bahan pengawet: kreosot (M63) liter
87 Mata Kucing (M64) buah
88 Anchorage (M65) Kg
89 Anti strpping agent (M66) liter
90 Bahan Modifikasi (M67) Kg
91 Additive / Superplasticizer (M67a) Ltr
92 Aditif anti pengelupasan Kg
93 Beton K-500 (M68) M3
94 Beton K-400 (M69) M3
95 Ducting (Kabel prestress) (M70) M'
96 Ducting (Strand prestress) (M71) M'
97 Beton K-350 (M72) M3
98 Multipleks 12 mm (M73) Lbr
99 Perletakan Elastomer jenis 1 (300 x 350 x 36) (M74a) buah
100 Perletakan Elastomer jenis 2 (350 x 400 x 39) (M74b) buah
101 Perletakan Elastomer jenis 3 (400 x 450 x 45) (M74c) buah
102 Expansion Tipe Joint Asphaltic Plug (M75d) M
103 Expansion Join Tipe Rubber (M75e) M
104 Besi Siku, 15 x 15 x 5 ( Ex. Join Tipe Ruber 1) M
105 Besi Siku, 20 x 20 x 10 (Ex. Join Tipe Ruber 2) M
106 Besi Siku, 25 x 25 x 12 ( Ex. Join Tipe Ruber 3) M
107 Expansion Join Baja Baja Bersudut, t : 2 cm (M75f) M
108 Marmer (M76) M2
109 Kerb Type A (M77) Buah
110 Kerb jenis 1 Buah
111 Kerb jenis 2 Buah
112 Kerb jenis 3 Buah
113 Paving Block (M78) Buah
114 Mini Timber Pile (M79) Buah
115 Expansion Joint Tipe Torma (M80) M1
116 Strip Bearing (M81) Buah
117 Joint Socket Pile 35x35 (M82) Set
118 Joint Socket Pile 16x16x16 (M83) Set
119 Mikro Pile 16x16x16 (M84) M1
120 Matras Concrete (M85) Buah
121 Assetilline (M86) Botol
122 Oxygen (M87) Botol
123 Batu Bara (M88) Kg
124 Agregat Pecah Mesin 0-5 mm (M91) M3
125 Agregat Pecah Mesin 5-10 & 10-20 mm (M92) M3
126 Agregat Pecah Mesin 20-30 mm (M93) M3
127 Joint Sealent (M94) Kg
128 Cat Anti Karat (M95) Kg
129 Expansion Cap (M96) M2
130 Polytene 125 mikron (M97) Kg
131 Curing Compound (M98) Ltr
132 Kayu Acuan (M99) M3
133 Casing Sumur Bor (M100) M2
134 Pasir Tailing M3
135 Polimer kg
136 Formwork Plate M2
137 Air Liter
138 Mortar M3
139 Paku Jalan Buah
140 Tanah Humus M3
141 Pupuk Kg
142 Join Filer M'
143 Perletakan Logam Buah
144 Strand Kg
145 Kayu Klas III M3
146 Minyak Begisting Liter
147 Kayu Klas II M3
148 Plywood tebal ( 240 x 120 x 0,9 ) cm Lembar
149 Dolken kayu dia. 8 - 10 cm, pj. 4 m Batang
150 Penjaga jarak begisting /spacer Buah
151 Amplas Lembar
152 BOX CULVERT PRE 50 x 50 x 100 mm M'
153 BOX CULVERT PRE 60 x 60 x 100 mm M'
154 BOX CULVERT PRE 70 x 70 x 100 mm M'
155 BOX CULVERT PRE 80 x 80 x 100 mm M'
156 BOX CULVERT PRE 90 x 90 x 100 mm M'
157 BOX CULVERT PRE 100 x 100 x 100 mm M'
158 BOX CULVERT PRE 200 x 200 x 100 mm M'
159 U-DITCH 40 x 40 x 100 mm M'
160 U-DITCH 60 x 60 x 100 mm M'
161 U-DITCH 80 x 80 x 100 mm M'
162 U-DITCH 100 x 100 x 120 mm M'

No Uraian Satuan

B HARGA BAHAN :
1 Abu Batu 0-0,5 cm M3
2 Accessories listrik Set
3 Additive / Superplasticizer Liter
4 Additive Anti Pengelupasan kg
5 Agregat Halus untuk Base M3
6 Agregat Halus ( 10 - 20 mm ) untuk Lapen/Hotmix M3
7 Agregat Kasar untuk Base M3
8 Agregat Kasar ( 20-30 mm & 30-50 mm ) untuk M3
9 Agregat Pecah Mesin 0-5 mm M3
10 Agregat Pecah Mesin 20-30 mm M3
11 Agregat Pecah Mesin 5-10 & 10-20 mm M3
12 Air Liter
13 Akustik 30 x 30 cm lbr
14 Akustik 30 x 60 cm lbr
15 Akustik 60 x 120 cm lbr
16 Alang - alang Ikat
17 Alumunium Gelombang lbr
18 Alumunium Strip M
19 Alumunium foil 1,2x50 m singgleside M2
20 Alumunium foil 1,2x50 m doubleside M2
21 Amplas Lembar
22 Anchorage kg
23 Angker Bolt (20 kg) Buah
24 Anti Strpping Agent Liter
25 Arbocell Kg.
26 Asbes Gelombang (180x 80 x 0,35) cm Lembar
27 Asbes Gelombang (210x105x0,4) cm Lembar
28 Asbes Gelombang (240x80x0,35) cm Lembar
29 Asbes Gelombang 2,25 x 0.92 m x 5 mm Lembar
30 Asbes Gelombang 2.00 x 0.92 m x 5 mm Lembar
31 Asbes Gelombang 1.80 x 0.92 m x 5 mm Lembar
32 Asbes Gelombang 3.00 x 1.05 m x 4 mm Lembar
33 Asbes Gelombang 2.70 x 1.05 m x 4 mm Lembar
34 Asbes Gelombang 2.40 x 1.05 m x 4 mm Lembar
35 Asbes Gelombang 2.10 x 1.05 m x 4 mm Lembar
36 Asbes Gelombang 1.50 x 1.05 m x 4 mm Lembar
37 Asbes Gelombang 3.00 x 1.08 m x 6 mm Lembar
38 Asbes Gelombang 2.70 x 1.08 m x 6 mm Lembar
39 Asbes Gelombang 2.40 x 1.08 m x 6 mm Lembar
40 Asbes Gelombang 2.10 x 1.08 m x 6 mm Lembar
41 Asbes Gelombang 1.80 x 1.08 m x 6 mm Lembar
42 Asbes Semen M2
43 Aspal Emulsi Kg
44 Aspal Semen Kg
45 Aspal Semen Ton
46 Assetilline Botol
47 Atap Spandek Polos Lbr
48 Atap Spandek Warna Lbr
49 Bahan Agr.Base Kelas A M3
50 Bahan Agr.Base Kelas B M3
51 Bahan Agr.Base Kelas C M3
52 Bahan Agr.Base Kelas S M3
53 Bahan Modifikasi kg
54 Bahan pengawet: kreosot liter
55 Baja Bergelombang Kg
56 Baja Prategang kg
57 Baja Struktur Kg
58 Baja Tulangan (Polos) U24 Kg
59 Baja Tulangan (Polos) U32 Kg
60 Baja Tulangan (Ulir) D32 Kg
61 Baja Tulangan (Ulir) D39 Kg
62 Baja Tulangan (Ulir) D48 Kg
63 Bak Cuci piring Satinles Steel 1 lubang Buah
64 Bak Mandi Fiber 1 M3 Buah
65 Bak Mandi Fiber 0,3 M3 Buah
66 Bak Mandi Plastik Buah
67 Bak porselen Buah
68 Bambu, Panjang 4m dia 100 mm Batang
69 Batako Buah
70 Bata Rooster Buah
71 Batu Apung Kg
72 Batu Bara Kg
73 Batu bata Buah
74 Batu Belah Hitam Utk Pondasi M3
75 Batu Belah Hitam 25/30 Cm M3
76 Batu Belah Hitam 0,5/1 Cm (Screening) M3
77 Batu Belah Hitam 10/15 Cm M3
78 Batu Belah Hitam 15/20 Cm M3
79 Batu Belah Hitam 1/2 Cm (Split) M3
80 Batu Belah Hitam 2/3 Cm (Split) M3
81 Batu Belah Hitam 3/5 Cm (Split) M3
82 Batu Belah Hitam 5/7 Cm (Gravel) M3
83 Batu Granit Kg
84 Batu Muka M2
85 Batu Palimanan M2
86 Bathcuip porselen buah
87 Baut Baja Ringan 10 x 16 Dus
88 Baut Baja Ringan 10 x 19 Dus
89 Bentonit Kg
90 Besi Baja IWF Kg
91 Besi Beton (Polos/Ulir) Kg
92 Besi Beton Ulir Kg
93 Besi Bulat st 60 Kg
94 Besi Canal Kg
95 Besi Hollow 50.50.3 Kg
96 Besi Hollow 4/4 btg
97 Besi Hollow 2/4 btg
98 Besi Profil Kg
99 Batu Paras M2
100 Besi plat 1 mm M2
101 Besi plat 1,2 mm M2
102 Besi Siku Kg
103 Besi Siku, 15 x 15 x 5 ( Ex. Join Tipe Ruber 1) M
104 Besi Siku, 20 x 20 x 10 (Ex. Join Tipe Ruber 2) M
105 Besi Siku, 25 x 25 x 12 ( Ex. Join Tipe Ruber 3) M
106 Besi Strip Kg
107 Beton K-125 M3
108 Beton K-175 M3
109 Beton K-250 M3
110 Beton K-300 M3
111 Beton K-350 M3
112 Beton K-400 M3
113 Beton K-500 M3
114 Bibit Pohon ( tinggi 1 m ) Buah
115 Bilik Bambu M2
116 Blockboard (122x244x1,8) Lbr
117 Box panel PVC isi 4 MCB bh
118 Box Zekering/ Termis 2 Group Buah
119 Box Zekering/ Termis 3 Group Buah
120 Bubungan Asbes 80 cm Lbr
121 Bubungan Bulat Genteng Zincalume pasir M
122 Bubungan Bulat Genteng Zincalume polos M
123 Bubungan asbes gelombang 0,92 Buah
124 Bubungan asbes gelombang 1,05 Buah
125 Bubungan asbes gelombang 1,08 Buah
126 Bubungan Genteng Kodok Buah
127 Bubungan Genteng Kramik/Glasur Buah
128 Bubungan Genteng Mantili Buah
129 Bubungan Genteng Plentong Buah
130 Bubungan karpet M
131 Bubungan Pinggir Genteng Zincalume polos M
132 Buisde 1/2 lingk. dia. 20 cm Buah
133 Buisde 1/2 lingk. dia. 30 cm Buah
134 Buisde 1/2 lingk. dia. 50 cm Buah
135 Buisde dia. 20 cm Buah
136 Buisde dia. 30 cm Buah
137 Buisde dia. 50 cm Buah
138 Buisde dia. 100 cm Buah
139 Buisde dia. 100 cm + Tulangan Buah
140 Bunker Oil Liter
141 Cat Alkali Kg
142 Cat Anti Karat kg
143 Cat Antara kg
144 Cat Dasar Kg
145 Cat Epoxy Kg
146 Cat Penutup Kg
147 Cat Penutup Eksterior Kg
148 Cat Genteng Kg
149 Cat Kayu/Besi Kg
150 Cat Marka (non Thermoplas) Kg
151 Cat Marka (Thermoplas) Kg
152 Cat Meni kayu Kg
153 Cat Meni kayu/besi Kg
154 Cat Taman Kg
155 Cat Tembok Kg
156 Cerucuk M
157 Compound Kg
157 Conblock HB-20 Buah
158 Conblock HB-15 Buah
159 Conblock HB-10 Buah
160 Cotton Plaster kg
161 Chek Valve 11/4" Buah
162 Chek Valve 11/2" Buah
163 Cherlag Kg
164 Chipping M3
165 Chipping (kg) Kg
166 Clemp Sadle dia 2" Buah
167 Clemp Sadle dia 3" Buah
168 Clemp Sadle dia 4" Buah
169 Curing Compound Liter
170 Dempul Kayu Kg
171 Dempul Tembok Kg
172 Diafragma Tengah K-350; 125 x 161 x 25 Unit
173 Diafragma Tepi K-350; 125 x 124 x 20 Unit
174 Dinabolt dia 12mm (10-15cm) Bh
175 Doble Nepel 1/2" Buah
176 Doble Nepel 3/4" Buah
177 Doble Nepel 1" Buah
178 Doble Nepel 1" Buah
179 Dolken kayu φ(8-10) Batang
180 Door closer Buah
181 Door Holder Buah
182 Door Holder Alumunium+Label set
183 Door Stop Buah
184 Dop 2"AW Buah
185 Dop 3"AW Buah
186 Dop 4" PVC Buah
187 Dop 6" PVC Buah
188 Down light / PLC 13 W bh
189 Elastomer M
190 Elastomer Alam Kg
191 Elastomer Sintesis Kg
192 Engsel Angin Casement Buah
193 Engsel Jendela Buah
194 Engsel Pintu Buah
195 Eternit (240 x 120 x 0,3)cm M2
196 Expansion Cup m2
197 Expansion Join Baja Baja Bersudut, t : 2 cm M
198 Expansion Joint Tipe Torma M1
199 Expansion Tipe Joint Asphaltic Plug M
200 Filler Kg
201 Fitting plafond + lampu bh
202 Formwork Plate m2
203 Formika lbr
204 Floor Hardener Kg
205 Floor Hinges+Door Strap set
206 Floor Drain bh
207 Gebalan Rumput M2
208 Gembok Buah
209 Generator Set Kap. 5000 Watt + Panel Lengkap Unit
210 Genteng Aspal Buah
211 Genteng Beton Glasur Buah
212 Genteng Beton Buah
213 Genteng Keramik warna Standard Buah
214 Genteng Kodok Buah
215 Genteng Mantili Buah
216 Genteng Plentong besar Buah
217 Genteng Plentong kecil Buah
218 Genteng Metal Zincalume pasir M2
219 Genteng Metal Zincalume polos M2
220 Geotextile M2
221 Glass Bead Kg
222 Glass Block Buah
223 Granit 40 x 40 cm Buah
224 Grendel Jendela Buah
225 Grendel Jendela/Rambuncis Buah
225 Grendel Pintu Panjang Buah
226 Grendel Pintu tanam Buah
227 Grendel Pintu tanam alumunium Buah
228 Gymfloor M2
229 Gypsum Lembar
230 Hak Angin / pengkait Buah
231 Harplek 1 x 1 m M2
232 Hidran Umum Kap. 3 m3 Buah
233 Ijuk m3
234 Isolasi bh
235 Jembatan Rangka Baja Kg
236 Jendela Nako M
237 Joint Filler m'
238 Joint Sealent kg
239 Joint Sealent Kg
240 Joint Socket Pile 16x16x16 Set
241 Joint Socket Pile 35x35 Set
242 Kabel Listrik NYA 1 x 1,5 mm Rol
243 Kabel Listrik NYA 1 x 2,5 mm Rol
244 Kabel Listrik NYM 2 x 1,5 mm Rol
245 Kabel Listrik NYM 2 x 2,5 mm Rol
246 Kabel Listrik NYM 3 x 2,5 mm Rol
247 Kabel Pompa dia= 2,5 mm x 3 M'
248 Kabel telephone 4 x 0.5 mm m'
249 Kaca Bening 3 mm M2
250 Kaca Bening 5mm M2
251 Kaca Bening 8mm M2
252 Kaca Cermin 5mm M2
253 Kaca Cermin 8mm M2
254 Kaca Es 3 mm M2
255 Kaca Patri 5 mm M2
256 Kaca Ribben/Buram Uk. 3 mm M2
257 Kaca Ribben/Buram Uk. 5 mm M2
258 Kaca Ribben/Buram Uk. 8 mm M2
259 Kaca Tempered Uk. 8 mm M2
260 Kaca Tempered Uk. 12 mm M2
261 Kaca Wireglass Tebal 5 mm M2
262 Kalkarium Kg
262 Kanstin Cetak 30 cm Buah
263 Kapur M3
264 Kapur sirih Kg
265 Karpet M2
266 kawat Beton Kg
267 Kawat Beton Kg
268 Kawat Bronjong Kg
269 Kawat Dia 4mm Kg
270 Kawat Duri Kg
271 Kawat Harmonika M2
272 Kawat Las Kg
273 Kawat Las / Electroda Dus
274 Kawat Nyamuk M2
275 Kawat Seling Baja 3/8" M
276 Kayu Acuan M3
277 Kayu Bakar M3
278 Kayu Balok kelas I M3
279 Kayu Balok kelas II M3
280 Kayu Balok kelas III M3
281 Kayu Balok kelas IV M3
282 Dolken kayu φ(8-10) Batang
283 Kayu kasau kelas I M3
284 Kayu kasau kelas II M3
285 Kayu kasau kelas III M3
286 Kayu kasau kelas IV M3
287 Kayu papan kelas I M3
288 Kayu papan kelas II M3
289 Kayu papan kelas III M3
290 Kayu papan kelas IV M3
291 Kayu perancah/begisting M3
292 Kayu reng 2/3 kelas II M3
293 Kayu reng 2/3 kelas III M3
294 Keramik 20/20 Polos bh
295 Keramik 20/20 Warna bh
296 Keramik 20/25 Polos bh
297 Keramik 20/25 Warna bh
298 Keramik 20/40 Warna bh
299 Keramik 30/60 Warna bh
300 Keramik 30/30 Polos bh
301 Keramik 30/30 Warna bh
302 Keramik 30/30 kasar bh
303 Keramik 40/40 Polos bh
304 Keramik 40/40 Warna bh
305 Keramik 50/50 Polos bh
306 Keramik 50/50 Warna bh
307 Keramik 60/60 Warna (Polished) bh
308 Keramik 80/80 Warna (Polished) bh
309 Keramik Mozaik 30X30 Cm Buah
310 Keramik Plin 10 x 30 cm Buah
311 Keramik Plin 10 x 40 cm Buah
312 Keramik Plin 10 x 50 cm
313 Keramik Plin 10 x 60 cm
314 Keramik Plin 10 x 80 cm
315 Keramik Plin 10 x 20 cm Buah
316 Keramik Plin 10 x 10 cm Buah
317 Keramik Plin 5 x 20 cm Buah
318 Kerb jenis 1 Buah
319 Kerb jenis 2 Buah
320 Kerb jenis 3 Buah
321 Kerb Type A Buah
322 Kerikil M3
323 Kerosen / Minyak Tanah Liter
324 Klem Pipa PVC Ø 1" Buah
325 Klem Pipa PVC Ø 1/2" Buah
326 Klem Pipa PVC Ø 3" Buah
327 Klem Pipa PVC Ø 3/4" Buah
328 Klem Pipa PVC Ø 4" Buah
329 Kloset Duduk Keramik (Natural) Buah
330 Kloset Jongkok Porselin Buah
331 Kloset Jongkok Teraso Buah
332 Knee "L" PVC Buah
333 Knee "L" PVC Ø 1/2" Buah
334 Knee "L" PVC Ø 2" Buah
335 Knee "L" PVC Ø 3" Buah
336 Knee "L" PVC Ø 3/4" Buah
337 Knee "L" PVC Ø 4" Buah
338 Knie GIP Ø 1" Buah
339 Knie GIP Ø 1/2" Buah
340 Knie GIP Ø 2" Buah
341 Knie GIP Ø 3/4" Buah
342 Knie PVC 1/2" Buah
343 Knie PVC 3/4" Buah
344 Knie PVC Ø 1" Buah
345 Knie PVC Ø 2" Buah
346 Kolom Pagar beton pracetak btg
347 Koral beton m3
348 Koral beton (kg) Kg
349 Kran air besi Ø 1/2" Buah
350 Kran air besi Ø 3/4" Buah
351 Kran zink bh
352 Kuku macan M'
353 Kunci Slot Buah
354 Kunci Silinder Buah
355 Kunci Lemari Buah
356 Kunci tanam antik Buah
357 Kunci tanam biasa Buah
358 Kunci tanam alumunium Buah
359 Kunci tanam kaca frameless Buah
360 Kunci pintu kamar mandi Buah
361 Kusen Almunium 3"(silver) M'
362 Kusen Almunium 3"(coklat/hitam) M'
363 Kusen Almunium 4"(silver) M'
364 Kusen Almunium 4"(coklat/hitam) M'
365 Kuas cat Buah
366 Lampu Down Light Buah
367 Lampu Hias/sorot Buah
368 Lampu Pijar 25 Watt Buah
369 Lampu Pijar 40 Watt Buah
370 Lampu SL 18 Watt Buah
371 Lampu TL 20 Watt Buah
372 Lampu RM 300 TL 2 x 18 W Divider Buah
373 Lampu RM 300 TL 2 x 36 W Divider Buah
374 Lantai kerja tebal 10cm M3
375 Latasir di AMP (Material Hotmix) Ton
376 Lem Plastik / Kayu Kg
377 Lem PVC Buah
378 Lis Gypsum M'
379 Lis Gibsum 10 cm M'
380 Lis Gibsum 15 cm M'
381 Lis Gibsum 5 cm M'
382 Lis Gibsun 20 cm M'
383 List Plafond PVC M'
384 List Plafond Propil 4 cm M'
385 List kayu 2/4 cm M'
386 Listplank GRC 20 cm M'
387 Listplank Zincalume 24 cm M'
388 Mangkokan listrik (Durados) Buah
389 Marmer 30/30 M2
390 Marmer 40/40 M2
391 Marmer 50/50 M2
392 Marmer 60/60 M2
393 Marmer 100/100 cm M2
394 Marmer Plint 10 x 30 cm Buah
395 Marmer Plint 10 x 40 cm Buah
396 Marmer Plint 10 x 60 cm Buah
397 Material Tanah Timbunan M3
398 Material Tanah Timbunan M3
399 Matras Concrete Buah
400 MCB 4 A bh
401 MCB 6 A bh
402 Meni Kayu/Besi Kg
403 Mikro Pile 16x16x16 M1
404 Mini Timber Pile Buah
405 Minyak Begisting Liter
406 Minyak bekisting Liter
407 Minyak Cat / Thinner Liter
408 Minyak Fluks Liter
409 Minyak pelumas / Oli Liter
410 Minyak pelumas / Oli Liter
411 Mortar M3
412 Multiplek 12 mm Lembar
413 Mur Baut 1/2", 5/8", 7/8" Kg
414 Nok Genteng Aspal Buah
415 Nok genteng beton Buah
416 Nok Stell Rata 0,92 Lembar
417 Nok Stell Rata 1,05 Lembar
418 Otomatis Pompa Unit
419 Outlet Telephone bh
420 Outlet TV bh
421 Over Sock GIP Ø 3/4" x Ø 1/2" Buah
422 Overshock PVC Ø 2" x Ø 1½" Buah
423 Overshock PVC Ø 3" x Ø 2" Buah
424 Oxygen Botol
425 Paku 1 - 5 cm Kg
426 Paku 5 – 10 cm Kg
427 Paku Asbes Kg
428 Paku Cacing Kg
429 Paku GRC Kg
430 Paku Gypsum Kg
431 Paku Jalan Buah
432 Paku Keling 3/4", 5/8", 7/8" Kg
433 Paku Sekrup (50 Bh / Kg) Kg
434 Paku Skrup bh
435 Paku Seng (100 Bh / Kg) Kg
436 Paku Triplek Kg
437 Panel Pagar Beton Pracetak Lbr
438 Panel Pompa set
439 Papan GRC Lembar
440 Parquet Kayu M2
441 Pasir beton M3
442 Pasir beton (kg) Kg
443 Pasir Pasang M3
444 Pasir Urug M3
445 Paving Block T = 6 Cm Buah
446 Paving Block T = 8 Cm Buah
447 PC-Grider K-500; L=25 m; h = 160 cm Unit
448 Pelat Baja/Besi Profil Kg
449 Pelat Rambu (Eng. Grade) BH
450 Pelat Rambu (High I. Grade) BH
451 Pemantul Cahaya (Reflector) Bh.
452 Penangkal Petir Unit
453 Pengelasan cm
454 Pengencer/thinner Kg
455 Penjaga Jarak Begisting / Spacer buah
456 Penyambungan Api Listrik 1300 VA Unit
457 Perletakan Elastomer jenis 1 (300 x 350 x 36) buah
458 Perletakan Elastomer jenis 2 (350 x 400 x 39) buah
459 Perletakan Elastomer jenis 3 (400 x 450 x 45) buah
460 Perletakan Logam Buah
461 Perancah kayu m3
462 Pintu Fibber KM Buah
463 Pipa Baja Kg
464 Pipa Baja Ø 63 mm Batang
465 Pipa Baja Ø 100 mm Batang
466 Pipa Baja Ø 125 mm Batang
467 Pipa Baja Ø 150 mm Batang
468 Pipa Baja Ø 200 mm Batang
469 Pipa Baja Ø 250 mm Batang
470 Pipa Baja Ø 300 mm Batang
471 Pipa Baja Ø 400 mm Batang
472 Pipa Baja Ø 450 mm Batang
473 Pipa Baja Ø 500 mm Batang
474 Pipa Baja Ø 600 mm Batang
475 Pipa Baja Ø 800 mm Batang
476 Pipa Baja Ø 900 mm Batang
477 Pipa Baja Ø 1000 mm Batang
478 Pipa Baja Ø 1100 mm Batang
479 Pipa Baja Ø 1200 mm Batang
464 Pipa Beton Ø 20 Cm Bh
465 Pipa Beton Ø 100 Cm Bh
466 Pipa DCI Ø 100 mm Batang
467 Pipa DCI Ø 125 mm Batang
468 Pipa DCI Ø 150 mm Batang
469 Pipa DCI Ø 200 mm Batang
470 Pipa DCI Ø 250 mm Batang
471 Pipa DCI Ø 300 mm Batang
472 Pipa DCI Ø 400 mm Batang
473 Pipa DCI Ø 450 mm Batang
474 Pipa DCI Ø 500 mm Batang
475 Pipa DCI Ø 600 mm Batang
476 Pipa DCI Ø 800 mm Batang
477 Pipa DCI Ø 900 mm Batang
478 Pipa DCI Ø 1000 mm Batang
479 Pipa DCI Ø 1100 mm Batang
480 Pipa DCI Ø 1200 mm Batang
466 Pipa Galvanis Ø 1" M'
467 Pipa Galvanis Ø 1/2" M'
468 Pipa Galvanis Ø 1½" M'
469 Pipa Galvanis Ø 2" M'
470 Pipa Galvanis Ø 2 1/2" M'
471 Pipa Galvanis Ø 3" M'
472 Pipa Galvanis Ø 3/4" M'
473 Pipa Galvanis Ø 4" M'
474 Pipa Galvanis Ø 6" M'
475 Pipa Galvanis Ø 8" M'
476 Pipa Galvanis Ø 10" M'
477 Pipa Galvanis Ø 12" M'
478 Pipa Galvanis Ø 16" M'
479 Pipa Galvanis Ø 18" M'
480 Pipa Galvanis Ø 20" M'
481 Pipa Galvanis Ø 24" M'
482 Pipa Galvanis Ø 28" M'
483 Pipa Galvanis Ø 32" M'
484 Pipa Galvanis Ø 36" M'
485 Pipa Galvanis Ø 40" M'
486 Pipa Galvanis Ø 44" M'
487 Pipa Galvanis Ø 48" M'
488 Pipa Galvanis Ø 1/2" SCH-40 M'
489 Pipa Galvanis Ø 3/4" SCH-40 M'
490 Pipa Galvanis Ø 1" SCH-40 M'
491 Pipa Galvanis Ø 1 1/2" SCH-40 M'
492 Pipa Galvanis Ø 2" SCH-40 M'
493 Pipa Galvanis Ø 2 1/2" SCH-40 M'
494 Pipa Galvanis Ø 3" SCH-40 M'
495 Pipa Galvanis Ø 4" SCH-40 M'
496 Pipa Galvanis Ø 6" SCH-40 M'
497 Pipa Holow M'
498 Pipa HPDE Ø 63mm M'
499 Pipa HPDE Ø 100mm M'
500 Pipa HPDE Ø 125mm M'
501 Pipa HPDE Ø 150mm M'
502 Pipa HPDE Ø 200mm M'
503 Pipa HPDE Ø 250mm M'
504 Pipa HPDE Ø 300mm M'
505 Pipa HPDE Ø 400mm M'
506 Pipa HPDE Ø 450mm M'
507 Pipa HPDE Ø 500mm M'
508 Pipa HPDE Ø 600mm M'
509 Pipa HPDE Ø 800mm M'
510 Pipa HPDE Ø 900mm M'
511 Pipa HPDE Ø 1000mm M'
512 Pipa HPDE Ø 1100mm M'
513 Pipa HPDE Ø 1200mm M'
509 Pipa Porus M'
510 Pipa PVC Ø 1" M'
511 Pipa PVC Ø 1,5" M'
512 Pipa PVC Ø 1/2" M'
513 Pipa PVC Ø 2" M'
514 Pipa PVC Ø 2 1/2" M'
515 Pipa PVC Ø 3" M'
516 Pipa PVC Ø 3/4" M'
517 Pipa PVC Ø 4" M'
518 Pipa PVC Ø 6" M'
519 Pipa PVC Ø 8" M'
520 Pipa PVC Ø 10" M'
521 Pipa PVC Ø 12" M'
522 Pipa PVC Ø 16" M'
523 Pipa PVC Ø 18" Batang
523 Pipa PVC Ø 20" Batang
524 Pipa PVC Ø 24" Batang
525 Pipa PVC Ø 32" Batang
526 Pipa PVC Ø 36" Batang
527 Pipa PVC Ø 40" Batang
528 Pipa PVC Ø 44" Batang
529 Pipa PVC Ø 48" Batang
524 Pipa Tanah Ø 20cm Batang
525 Pipa Tanah Ø 15cm Batang
525 Pipa Screen Diameter 4" M
526 Pipa Screen Diameter 6" M
527 Porselen 11 x 11 cm Buah
528 Porselen 10 x 20 cm Buah
529 Porselen 20 x 20 cm Buah
530 Plamir kayu / besi Kg
531 Plamir Tembok Kg
532 Plan Deck tebal 7 cm K-350 Unit
533 Plastik Filter M2
534 Plat 400 x 300/3 Batang
535 Plat mur, Plong, baut / Begel U Kg
536 Plat Perletakan bh
537 Plat Sudut bh
538 Plapond PVC board Lbr
539 Politur Jadi Liter
540 Politur Liter
541 Plywood 12 mm Lembar
542 Plywood 9 mm Lembar
543 Plywood 6 mm Lembar
544 Plywood 3 mm Lembar
545 Plywood 4 mm Lembar
546 Plywood tebal ( 240 x 120 x 0,9 ) cm Lembar
547 Polimer kg
548 Polytane 125 micron kg
549 Pompa sentrifugal (SH=7m ; Max FR= 20-220 ltr/min) Unit
550 Pompa Submersible (SP 1 HP H=40 m, Q= 3 m3/h) Unit
551 Pompa Submersible (SP 3/4 HP H=40 m, Q= 2,4 m3/h) Unit
552 Premium Ltr
553 Profil Allum"T" M
554 Profil Allumunium M
555 Profil Kaca M
556 Profil Jendela Alumunium M
557 Profil Pintu Alumunium M
558 Profil U.85-06 btg
559 Profil Reng RT. 15 btg
560 Pupuk Kg
561 Phenol film 12mm L br
562 Ramset buah
563 Rangka Atap Lapis Zinc Alumunium Type - C 75 , t = 0.75 M2
564 Rangka Atap Lapis Zinc Alumunium Type - C 85 , t = 1 M2
565 Reducer PVC 4" - 6" Buah
566 Reducer PVC 4" - 6" Buah
567 Rel Pengaman M'
568 Rel Pintu Dorong Bh
569 Reng Lapis Zincalume t=0,45 M
570 Rooflight 90x180 Lbr
571 Rolling Door Besi M2
572 Rolling Door Allumunium M2
573 Folding Gate Besi M2
574 Roster Beton 15/20 Buah
575 Rumput Gajah Australia M2
576 Rumput Gajah biasa M2
577 Rumput Gajah mini M2
578 Rumput Golf M2
579 Sirtu M3
580 Sabun Kg
581 Saklar Double kualitas baik Buah
582 Saklar Single kualitas baik Buah
583 Saklar Triple kualitas baik Buah
584 Saringan Air / Floor Drain Buah
585 Sealant Tube
586 Seal tape Buah
587 Selinder Buah
588 Semen PC (50 Kg) Zak
589 Semen portland Kg
590 Semen Putih (50 Kg) Zak
591 Semen Grouting Kg
592 Semen warna Kg
593 Seng Alumunium M2
594 Seng BJLS 35" M2
595 Seng Bubungan 0,92 Lembar
596 Seng Bubungan 1,05 Lembar
597 Seng Bubungan 1,08 Lembar
598 Seng Gelombang Lembar
599 Seng Gelombang BJLS 27 Lembar
600 Seng Gelombang BJLS 30 Lembar
601 Seng Plat BJLS 27 Lembar
602 Seng Plat BJLS 30 Lembar
603 Seng Rata Lembar
604 Septicktank dan Peresapan Unit
605 Shockdrat dalam PVC Ø 3" Buah
606 Shockdrat dalam PVC Ø 3/4" Buah
607 Shockdrat dalam PVC Ø 4" Buah
608 Shockdrat luar Galvanis Ø 1" Buah
609 Shockdrat luar Galvanis Ø 1/2" Buah
610 Shockdrat luar Galvanis Ø 4" Buah
611 Shockdrat luar PVC Diameter 2" Buah
612 Shockdrat luar PVC Diameter 3/4" Buah
613 Shower Set unt
614 Shower Spray unt
615 Sirap Kayu 3mm Lbr
616 Skrup Fixer Buah
617 Sirtu / Krokos M3
618 Slot Tanam Buah
619 Sock 1/2" GIP Buah
620 Sock 3/4" GIP Buah
621 Sock 1" GIP Buah
622 Sock 2" GIP Buah
623 Sock 1/2" PVC Buah
624 Sock 3/4" PVC Buah
625 Sock 1" PVC Buah
626 Sock 2" PVC Buah
627 Sock derat dalam GIP 2" Buah
628 Sock derat dalam PVC 3/4" Buah
629 Sock derat Luar 1/2" Buah
630 Sock derat Luar 3/4" Buah
631 Sock derat Luar 1" Buah
632 Sock derat Luar 1 1/4" Buah
633 Sock derat Luar 2" Buah
634 Soda api Kg
635 Solar Liter
636 Solite Pen/Pengunci Buah
637 Spring knip Buah
638 Stop Kontak Buah
639 Stop Kran 1" Buah
640 Stop Kran 11/4" Buah
641 Stop Kran 2" Buah
642 Stop Kran 3" Buah
643 Stop Kran Ball Valve 3/4" Buah
644 Stop Kran Ball Valve 1/2" Buah
645 Strip Bearing Buah
646 Strorox – 100 Liter
647 Talang Fiber M'
648 Talang jurai dalam Lapis Zinc Alumunium M'
649 Talang karpet M'
650 Tali Ijuk Kg
651 Tambang Plastik 8 mm M'
652 Tanah Timbunan Pilihan M3
653 Tanah Timbunan Biasa M3
654 Tanaman Semak/Perdu M2
655 Tarikan Jendela Buah
656 Teakwood 3 mm Lembar
657 Teakwood 4 mm Lembar
658 Teakwood 5 mm Lembar
659 Teak Oil Ltr
660 TEE 1/2" PVC Buah
661 TEE 3/4" PVC Buah
662 TEE 1" PVC Buah
663 TEE 2" PVC Buah
664 TEE 1/2" GIP Buah
665 TEE 3/4" GIP Buah
666 TEE 1" GIP Buah
667 TEE 2" GIP Buah
668 TEE Over 3" ke 2" PVC Buah
669 TEE Over 2" ke 1" PVC Buah
670 Tee Ø 150 mm Buah
671 Tee Ø 200 mm Buah
672 Tee Ø 250 mm Buah
673 Tee Ø 300 mm Buah
674 Tee Ø 400 mm Buah
675 Tee Ø 450 mm Buah
676 Tee Ø 500 mm Buah
677 Tee Ø 600 mm Buah
678 Tee Ø 700 mm Buah
679 Tee Ø 800 mm Buah
680 Tee Ø 900 mm Buah
681 Tee Ø 1000 mm Buah
682 Tee Ø 1100 mm Buah
683 Tee Ø 1200 mm Buah
684 Tempat Sabun bh
685 Ter / Residu Kg
686 Tiang Pancang Dia. 40 cm K-600 Kg/Cm2 Buah
687 Tiang Pancang Dia. 45 cm K-600 Kg/Cm2 M'
688 Tower Air Fiber 0,50 M3 Buah
689 Tower Air Fiber 1,00 M3 Buah
690 Tralis Besi M2
691 Traso Plint 10/30 Buah
692 Triplek 3 mm Lembar
693 Triplek 4 mm Lembar
694 Triplek 6 mm Lembar
695 Ubin Abu - Abu 40X40 CM Buah
696 Ubin Abu - Abu 30X30 CM Buah
697 Ubin Abu - Abu 20X20 CM Buah
698 Ubin Abu - Abu Plint 15X20 CM Buah
699 Ubin Abu - Abu Plint 10X30 CM Buah
700 Ubin Abu - Abu Plint 10X40 CM Buah
701 Ubin Granito 30 x 30 cm Buah
702 Ubin Granito 40 x 40 cm Buah
703 Ubin Granito 60 x 60 cm Buah
704 Ubin Granito 80 x 80 cm Buah
705 Ubin Granito Plint 10 x 60 cm Buah
706 Ubin Granito Plint 10 x 80 cm Buah
707 Ubin Granito Plint 10 x 40 cm Buah
708 Ubin Granito Plint 10 x 30 cm Buah
709 Ubin Keramik Artistik 10X20 CM Buah
710 Ubin Keramik Artistik 10X10 CM Buah
711 Ubin Keramik 33X33 CM Buah
712 Ubin Teralux Marmer 40X40 CM Buah
713 Ubin Teralux Marmer 30X30 CM Buah
714 Ubin Teralux Marmer 60X60 CM Buah
715 Ubin Traso 40/40 Buah
716 Ubin Traso 30/30 Buah
717 Ubin Wafel 20/20 Buah
718 Underlayer M2
719 Urinoir Buah
720 Valve Ø 150mm Buah
721 Valve Ø 200mm Buah
722 Valve Ø 250mm Buah
723 Valve Ø 300mm Buah
724 Valve Ø 400mm Buah
725 Valve Ø 450mm Buah
726 Valve Ø 500mm Buah
727 Valve Ø 600mm Buah
728 Valve Ø 700mm Buah
729 Valve Ø 800mm Buah
730 Valve Ø 900mm Buah
731 Valve Ø 1000mm Buah
732 Valve Ø 1100mm Buah
733 Valve Ø 1200mm Buah
720 Vernis Ltr
721 Vynil M2
722 Wall Paper M'
723 Wastafel Buah
724 Water drain + asesories Set
725 Water Meter 2" Buah
726 Watter Moor 11/4" Buah
727 Watter Moor 11/2" Buah
728 Water Stop 150mm m
729 Water Stop 200mm m
728 Westafel Porselen Buah
729 Wood Filler Kg

BIAYA SEWA PERALATAN PER JAM KERJA

No. Uraian Kode SATUAN

C. HARGA SEWA ALAT


1 ASPHALT MIXING PLANT #REF! Jam
2 ASPHALT FINISHER #REF! Jam
3 ASPHALT SPRAYER #REF! Jam
4 BULLDOZER 100-150 HP #REF! Jam
5 COMPRESSOR 4000-6500 L\M #REF! Jam
6 CONCRETE MIXER 0.3-0.6 M3 #REF! Jam
7 CRANE 10-15 TON #REF! Jam
8 DUMP TRUCK 3.5 TON #REF! Jam
9 DUMP TRUCK 10 TON #REF! Jam
10 EXCAVATOR 80-140 HP #REF! Jam
11 FLAT BED TRUCK 3-4 M3 #REF! Jam
12 GENERATOR SET #REF! Jam
13 MOTOR GRADER >100 HP #REF! Jam
14 TRACK LOADER 75-100 HP #REF! Jam
15 WHEEL LOADER 1.0-1.6 M3 #REF! Jam
16 THREE WHEEL ROLLER 6-8 T #REF! Jam
17 TANDEM ROLLER 6-8 T. #REF! Jam
18 TIRE ROLLER 8-10 T. #REF! Jam
19 VIBRATORY ROLLER 5-8 T. #REF! Jam
20 CONCRETE VIBRATOR #REF! Jam
21 STONE CRUSHER #REF! Jam
22 WATER PUMP 70-100 mm #REF! Jam
23 WATER TANKER 3000-4500 L. #REF! Jam
24 PEDESTRIAN ROLLER #REF! Jam
25 TAMPER #REF! Jam
26 JACK HAMMER #REF! Jam
27 FULVI MIXER #REF! Jam
28 CONCRETE PUMP #REF! Jam
29 TRAILER 20 TON #REF! Jam
30 PILE DRIVER + HAMMER #REF! Jam
31 CRANE ON TRACK 35 TON #REF! Jam
32 WELDING SET #REF! Jam
33 BORE PILE MACHINE #REF! Jam
34 ASPHALT LIQUID MIXER #REF! Jam
35 TRONTON #REF! Jam
36 COLD MILLING MACHINE #REF! Jam
37 ROCK DRILL BREAKER #REF! Jam
38 COLD RECYCLER #REF! Jam
39 HOT RECYCLER #REF! Jam
40 AGGREGAT (CHIP) SPREADER #REF! Jam
41 ASPHALT DISTRIBUTOR #REF! Jam
42 SLIP FORM PAVER #REF! Jam
43 CONCRETE PAN MIXER #REF! Jam
44 CONCRETE BREAKER #REF! Jam
45 ASPAHLT TANKER #REF! Jam
46 CEMENT TANKER #REF! Jam
47 CONDRETE MIXER (350) #REF! Jam
48 VIBRATING RAMMER #REF! Jam
49 TRUK MIXER (AGITATOR) #REF! Jam
50 BORE PILE MACHINE DIA 60 #REF! Jam
51 CRANE ON TRACK 75-100 TON #REF! Jam
52 BLENDING EQUIPMENT #REF! Jam
53 ASPHALT LIQUID MIXER (20KL) #REF! Jam
54 BATCHING PLANT #REF! Jam
55 CHAIN SAW #REF! Jam
56 MESIN CAT MARKA #REF! Jam
57 CUTTER MACHINE Jam
58 MESIN LAS LISTRIK Jam
59 PIPE SUPPORT Jam
60 Sewa Tripot/Tackel & handle crane 2 T Jam
61 Peralatan potong pipa T1/Manual (gergaji) / Saw Jam
62 Peralatan potong pipa T2/Mekanik / Cilinder Saw Jam
63 CRANE 3 TON Jam
64 Sewa Pompa Submersible 3m3/h Jam
ERJA HARIAN

Harga Upah (Rp) Keterangan


Jangan diedit
Hari
99,000.00
104,500.00
104,500.00
105,600.00
100,000.00
71,500.00
65,000.00
71,500.00
71,500.00
71,500.00
55,000.00
93,500.00
93,500.00
65,000.00
93,500.00
93,500.00
93,500.00
93,500.00
93,500.00
93,500.00
93,500.00
93,500.00
93,500.00
93,500.00
93,500.00
93,500.00

HARGA
SATUAN KETERANGAN
( Rp.)

198,000.00 Base Camp Harga Gabungan


186,300.00 Base Camp
186,300.00 Base Camp
253,000.00 Lokasi Pekerjaan
326,212.45 Base Camp
338,862.45 Base Camp Jangan diedit
1,298.00 Semen
253,000.00 Lokasi Pekerjaan
253,000.00 Lokasi Pekerjaan
265,262.45 Lokasi Pekerjaan
271,012.45 Base Camp
40,250.00 Borrow Pit/quarry
115,000.00 Lokasi Pekerjaan
28,750.00 Quarry
11,666.67 Base Camp
11,666,666.67 Base Camp
13,800.00 Base Camp
64,900.00 Base Camp
1,298.00 Base Camp
14,783.00 Lokasi Pekerjaan
17,250.00 Lokasi Pekerjaan
16,100.00 Lokasi Pekerjaan
207,000.00 Lokasi Pekerjaan
95,000.00 Lokasi Pekerjaan 187,000.00
187,000.00 Lokasi Pekerjaan 28,750.00
12,500.00 Lokasi Pekerjaan
1,610,000.00 Lokasi Pekerjaan
10,400.00 Pertamina
13,397.50 Pertamina
34,500.00 Drum-druman
13,340.00 Lokasi Pekerjaan
585,000.00 Lokasi Pekerjaan
175,000.00
97,500.00
50,000.00 Lokasi Pekerjaan
#REF! Dari Analisa
#REF! Dari Analisa
#REF! Dari Analisa
#REF! Dari Analisa
- Tidak tersedia
27,500.00 Lokasi Pekerjaan
11,110.00 Base Camp
18,400.00 Lokasi Pekerjaan
23,000.00 Lokasi Pekerjaan
57,500.00 Lokasi Pekerjaan
19,000.00 Lokasi Pekerjaan
32,890.00 Lokasi Pekerjaan
250,000.00 Lokasi Pekerjaan
300,000.00 Lokasi Pekerjaan
600,000.00 Lokasi Pekerjaan
#REF! Dari Analisa
14,783.00 Lokasi Pekerjaan
14,783.00 Lokasi Pekerjaan
14,783.00 Lokasi Pekerjaan
14,783.00 Lokasi Pekerjaan
1,250,000.00 Hasil Proses
287,500.00 Base Camp
125.00 Base Camp
92,000.00 Base Camp
17,250.00 Base Camp
180,550.00 Base Camp 180,550.00
40,250.00 Base Camp
15,000.00 Lokasi Pekerjaan
#REF! Dari Analisa
15,000.00 Pabrik
14,783.00 Lokasi Pekerjaan
- Lokasi Pekerjaan
- Pabrik
26,400.00 Lokasi Pekerjaan
23,000.00 Pabrik
21,735.00 Base Camp
5,000.00 Base Camp
- Base Camp
-
- Base Camp
14,783.00 Lokasi Pekerjaan
- Lokasi Pekerjaan
- Lokasi Pekerjaan
- Lokasi Pekerjaan
- Lokasi Pekerjaan
- Lokasi Pekerjaan
- Lokasi Pekerjaan
#REF! Dari Analisa
#REF! Dari Analisa
69,000.00
-
230,000.00
17,250.00
34,500.00
11,500.00
86,250.00
26,000.00
27,600.00
1,150.00
51,750.00
57,500.00
#REF! Dari Analisa
#REF! Dari Analisa
-
-
#REF! Dari Analisa
185,000.00
1,500,000.00 Base Camp
1,725,000.00 Base Camp
2,300,000.00 Base Camp
230,000.00 Base Camp
- Base Camp
175,000.00 Lokasi Pekerjaan
470,000.00 Lokasi Pekerjaan
700,000.00 Lokasi Pekerjaan
1,725,000.00 Base Camp
500,000.00 Base Camp
28,750.00 Base Camp
28,750.00 Base Camp
34,500.00 Base Camp
40,250.00 Base Camp
1,897.50 Lokasi Pekerjaan
34,500.00 Lokasi Pekerjaan
1,725,000.00 Lokasi Pekerjaan
172,500.00 Lokasi Pekerjaan
625,000.00 Lokasi Pekerjaan
100,000.00 Lokasi Pekerjaan
74,750.00 Lokasi Pekerjaan
460,000.00 Lokasi Pekerjaan
264,500.00 Lokasi Pekerjaan
115,000.00 Lokasi Pekerjaan
600.00 Lokasi Pekerjaan
326,212.45 Base Camp
338,862.45 Base Camp
326,212.45 Base Camp
40,250.00 Lokasi Pekerjaan
51,750.00 Lokasi Pekerjaan
11,500.00 Lokasi Pekerjaan
28,750.00 Lokasi Pekerjaan
49,450.00 Lokasi Pekerjaan
1,610,000.00 Lokasi Pekerjaan

- Base Camp
51,750.00 Base Camp
575,000.00
75.00
500,000.00
24,150.00
172,500.00
8,050.00
34,500.00
287,500.00
-
2,250,000.00 Balok
5,175.00
4,140,000.00 Balok
125,000.00
26,500.00
20,000.00
5,000.00
3,818,728.61 Lokasi Pekerjaan
4,030,181.71 Lokasi Pekerjaan
4,853,077.26 Lokasi Pekerjaan
6,772,120.37 Lokasi Pekerjaan
11,824,535.79 Lokasi Pekerjaan
12,221,735.37 Lokasi Pekerjaan
36,312,483.90 Lokasi Pekerjaan
2,770,454.21 Lokasi Pekerjaan
3,377,973.74 Lokasi Pekerjaan
3,405,747.20 Lokasi Pekerjaan
3,840,757.25 Lokasi Pekerjaan

Harga Bahan (Rp)


Sebelum Pajak

326,212.45
10,925.00
51,750.00
57,500.00
326,212.45 DIAMBIL DARI ATAS
338,862.45
271,012.45
326,212.45
326,212.45
326,212.45
338,862.45
75.00 75,000.00
11,000.00
19,000.00 41.67
71,500.00
2,500.00

26,000.00
5,250.00 315,000.00
8,650.00 519,000.00
5,000.00
26,000.00
33,100.00
27,600.00 27,600.00
40,250.00 40,250.00
38,525.00
63,825.00
45,885.00
64,400.00
50,600.00
51,750.00
94,070.00
85,100.00
74,750.00
63,825.00
46,000.00
121,900.00
83,950.00
49,450.00
69,000.00
56,350.00
21,500.00
11,110.00 10,790.32
11,666.67
11,666,666.67
264,500.00
350,000.00
450,000.00
#REF! analisa
#REF! analisa
#REF! analisa
#REF! analisa
1,150.00
11,500.00
15,000.00
25,000.00
15,000.00
14,783.00
14,783.00
14,783.00
14,783.00
14,783.00
225,000.00
750,000.00
250,000.00
276,200.00
2,500,000.00
8,400.00
4,000.00
8,500.00
25,000.00
600.00
400.00
253,000.00
253,000.00
326,212.45
253,000.00
253,000.00
338,862.45
326,212.45
326,212.45
265,262.45

78,500.00
149,500.00
1,750,000.00
977,500.00
1,035,000.00
6,900.00
14,000.00
14,783.00
14,783.00
13,700.00
13,000.00
13,000.00
60,000.00
40,000.00
13,000.00
70,000.00
171,200.00
210,000.00
14,000.00
175,000.00
470,000.00
700,000.00
25,000.00
1,048,093.20
1,169,605.07
1,264,100.32
1,314,166.14
1,317,121.25
1,405,598.81
1,453,022.42
57,500.00
40,250.00
235,000.00
187,450.00
184,000.00
187,450.00
21,160.00
78,545.00
62,790.00
8,970.00
10,000.00
11,000.00
3,450.00
31,050.00
3,450.00
4,600.00
9,000.00
46,000.00
31,625.00
37,375.00
86,250.00
55,000.00
65,000.00
150,000.00
500,000.00
550,000.00
4,500.00
50,000.00
51,750.00
30,000.00
27,500.00
75,000.00
34,500.00
90,000.00 94,000.00
35,000.00
48,300.00
95,000.00
187,000.00
25,000.00
25,000.00
80,000.00
34,500.00
6,000.00
40,000.00
3,500.00
4,500.00
5,500.00
65,000.00
176,000.00
220,000.00
68,300.00
250,000.00
125.00
31,600.00
44,200.00
56,900.00
43,000.00
32,500.00 Impra
15,800.00
3,119,000.00
2,891,000.00
15,000.00
4,900.00
7,700.00
10,400.00
50,500.00
26,500.00
150,000.00
125,000.00
50,000.00
55,000.00
22,000.00
33,000.00
46,700.00
137,500.00
33,000.00
200,000.00
15,000.00
30,000.00
25,000.00
15,000.00
20,000.00
45,200.00
10,000.00
1,500,000.00
1,500,000.00
200,000.00
1,360.00
75,000.00 Panasonic
500,000.00
100,000.00
25,000.00
1,450,000.00
45,000.00
16,000.00
75,000.00
7,500,000.00
20,000.00
8,500.00
6,500.00
15,000.00
800.00
1,100.00
2,850.00
1,250.00
72,000.00 114,400.00
51,250.00 90,000.00
27,500.00 27,500.00
28,600.00
33,600.00
162,000.00
12,500.00
20,000.00
20,000.00
50,000.00
25,000.00
150,000.00
66,700.00
10,000.00
22,000.00
5,660,000.00
20,000.00
5,000.00
35,100.00
65,000.00
30,000.00
35,000.00
35,000.00
100,000.00
625,000.00
175,000.00 175,000.00
280,000.00 280,000.00
275,000.00 275,000.00
395,000.00 395,000.00
491,400.00 500,000.00
16,500.00
2,000.00
52,000.00 45,217.39 52,000.00
65,000.00 56,521.74
200,000.00 200,000.00
150,000.00
300,000.00
110,000.00 51,229.51
1,600,000.00 74,147.97
60,000.00 56,622.09
95,000.00 74,147.97
300,000.00 300,000.00
546,000.00 450,000.00
650,000.00 550,000.00
1,500,000.00
100,000.00
15,000.00
1,250,000.00
7,500.00
15,000.00
17,250.00
17,250.00
16,100.00
18,000.00
20,000.00
15,000.00
26,400.00 26,400.00
132,000.00 26,400.00
18,000.00
38,000.00
1,610,000.00
305,128.00
9,775,000.00 Merbau
4,140,000.00 Meranti
2,250,000.00 Gelam, Waru gunung
1,610,000.00 Sengon,akasia
26,500.00
10,350,000.00 Merbau
4,140,000.00 Meranti
2,250,000.00 Bayur,Gelam
1,610,000.00 sengon
10,350,000.00 Merbau
4,370,000.00 Meranti
3,850,000.00 Cempaka, 3,200,000.00
2,012,500.00 kemiri
1,610,000.00 sengon
4,050,000.00
2,870,000.00
2,500.00 20.00
2,800.00
3,500.00
4,250.00
9,230.77 12.50 13.00
22,500.00 5.56
6,000.00 6.25
6,018.18
6,500.00
12,000.00 6.25 10,714.29
15,000.00
20,625.00
30,000.00
71,250.00 71,250.00
240,000.00 240,000.00
60,000.00
3,700.00 1.28
4,200.00
6,000.00
11,875.00
30,000.00
3,300.00
1,650.00
1,650.00
25,000.00
30,000.00
35,000.00
25,000.00
338,862.45
12,000.00
850.00
650.00
3,000.00
1,500.00
4,000.00
2,100,000.00
250,000.00
150,000.00
5,300.00
4,200.00
7,900.00
6,000.00
28,000.00
60,000.00
11,000.00
6,000.00
29,400.00
7,000.00
3,000.00
3,000.00
6,300.00
16,800.00
195,000.00
338,862.45
188.26
35,000.00
38,400.00 Kusen 3"
299,000.00 Silver
6,300.00 35,833.33
45,000.00 Kusen 3"
125,000.00 Coklat
13,000.00 40,833.33
365,000.00
180,000.00
135,000.00 Kusen 4"
550,000.00
50,000.00 Silver
44,250.00 46,666.67 36,850.00 44,220.00
55,500.00 42,850.00 51,420.00
75,000.00 Kusen 4" 46,850.00 56,220.00
89,000.00 Coklat 52,500.00 63,000.00
16,000.00 52,500.00
55,000.00
95,000.00
7,500.00
15,000.00 Floor hinge 750,000
40,250.00 Fitting kaca 225,000
45,000.00
200,000.00
250,000.00
500,000.00
1,095,700.00
52,000.00 20,000.00
8,400.00
12,000.00
18,900.00
21,000.00
14,700.00
28,400.00
105,000.00
9,000.00
1,850,000.00
12,000.00 12,000.00
70,000.00
5,300.00
187,500.00
285,700.00
325,700.00
350,700.00
400,000.00
16,500.00
19,800.00
22,500.00
100,000.00
35,000.00
400,000.00
35,000.00 Legran
35,000.00 Legran
33,000.00
65,000.00
30,000.00
4,500.00
4,500.00
19,000.00
21,735.00 7,000.00
34,500.00
34,500.00 26,400.00
500,000.00
183,800.00
18,900.00
90,000.00
7,800.00
27,300.00
34,000.00
126,000.00
43,575.00
43,575.00
7,400.00
8,400.00
12,100.00
115,000.00
12,500.00
12,500.00
21,000.00
22,000.00
25,200.00
21,000.00
75,000.00
13,200.00
15,180.00
303.60
21,000.00
25,000.00
105,000.00
3,500,000.00
4,025,000.00
230,000.00
198,000.00
141.43
186,300.00
180,550.00
1,650.00
1,897.50 1,850.00
202,432,000.00
13,500.00
250,000.00
300,000.00
15,000.00
2,887,500.00
3,854.37
19,000.00
20,000.00
2,625,000.00
1,000,000.00
1,500,000.00
2,000,000.00
250,000.00
1,800,000.00
378,000.00
23,000.00

45,000.00
425,000.00

15,000.00
12,500.00
97,500.00 585,000.00
100,000.00
162,500.00
175,000.00 175,000.00
13,500.00
185,000.00
350,000.00
450,000.00
564,213.20
678,426.40
906,852.79
1,021,065.99
1,135,279.19
1,363,705.58
1,592,131.98
1,820,558.38
2,048,984.77
2,277,411.17
2,505,837.56
2,734,263.96
16,666.67
22,500.00
32,500.00
52,500.00
70,000.00
110,833.33
144,166.67
216,666.67
366,666.67
60,000.00 Utk rangka plafond
39,800.00
81,000.00
155,000.00
193,000.00
395,000.00
615,000.00
977,000.00
1,573,000.00
1,993,000.00
2,458,000.00
3,900,000.00

50,000.00
8,062.50
13,962.50
4,500.00
17,675.00
21,250.00
34,437.50
6,000.00
56,475.00
135,475.00
225,275.00
300,000.00
412,500.00
535,250.00

2,443,000.00

162,500.00
100,000.00
583,300.00
1,066,700.00
1,200.00 82.64 85000
1,750.00 50.00
3,500.00 25.00
18,000.00
20,125.00
678,000.00
13,340.00
42,000.00
18,900.00
65,000.00
25,000.00
250,000.00
53,000.00
45,000.00
185,000.00
125,000.00
83,333.33
48,000.00
68,000.00
125,000.00
45,000.00
25,000.00
3,500,000.00
12,500,000.00
7,900,000.00
10,400.00
26,666.67
38,500.00
7,500.00
71,000.00 50,000.00
100,000.00
87,000.00
52,750.00
7,000.00
20,000.00 Pintu 80x200
14,950.00 195,000.00 6.00 1.6
86,250.00 350,000.00 4.40 2
98,000.00 450,000.00 4.40 2
175,000.00 65,000.00 6.00 4.8
175,000.00
185,000.00 5.6
185,000.00
36,000.00 Jendela
75,000.00 50,000.00 60,000.00
475,000.00
650,000.00
850,000.00
40,000.00
22,500.00
18,400.00
49,500.00
27,500.00
207,000.00
10,000.00
33,500.00
24,000.00
43,000.00
50,000.00
28,000.00
8,400.00
242,000.00 type 08510 ex. Cisa
64,900.00
1,298.00
90,200.00
16,500.00
9,500.00
48,000.00
26,600.00
27,300.00
34,000.00
35,000.00
39,000.00
37,800.00
39,900.00
27,900.00
39,400.00
16,000.00
2,887,500.00
25,000.00
2,600.00
28,900.00
18,500.00
14,500.00
57,750.00
18,000.00
3,500.00
472,500.00 type TX 423 SZ ex. Toto
181,000.00 type THX 20 NBPIV ex. Toto
8,571.43
500.00
180,000.00
85,000.00
3,800.00
11,000.00
7,100.00
16,500.00
2,500.00
3,000.00
3,500.00
6,000.00
17,000.00
3,500.00
3,000.00
3,500.00
4,000.00
6,000.00
12,000.00
30,000.00
13,397.50
34,500.00
35,000.00
22,500.00
195,000.00
199,500.00
404,300.00
589,100.00
84,000.00
63,000.00
150,000.00
88,500.00
53,000.00
74,750.00
28,000.00
5,000.00
21,000.00
115,000.00
40,250.00
20,000.00
5,000.00
86,100.00
96,100.00
120,800.00
50,000.00
3,500.00
4,500.00
5,500.00
8,500.00
7,400.00
10,000.00
30,000.00
30,000.00
13,700.00
29,100.00

44,000.00
24,400.00
624,000.00
594,000.00
780,570.00
1,200,000.00
280,000.00
3,000.00
48,000.00
68,000.00
83,333.33
60,000.00
3,350.00
2,200.00
2,000.00
2,200.00
2,300.00 250,000
15,300.00 6.25 35,714
40,000.00
91,250.00 1.44 81,250.00
288,000.00 216,666.67
15,208.33
36,000.00 6.25
10,000.00 2.78
5,100.00 2.25
3,250.00 90,000.00
2,250.00
6,000.00
45,000.00
35,000.00
65,000.00
6,000.00
4,000.00
2,000.00
45,000.00
700,000.00

60,000.00
95,000.00
150,000.00
500,000.00
75,000.00
150,000.00
28,000.00
35,000.00
99,200.00
128,000.00
500,000.00
32,000.00

Biaya Sewa Biaya Sewa


Alat / Jam Alat / Hari
(di luar PPn) (di luar PPn)
#REF! #REF! DARI ANALISA REKAP ANALISA ALAT
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
50,000.00 350,000.00 NO.56-64 ISIAN MANUAL
15,000.00 105,000.00
25,000.00 175,000.00
1,428.57 10,000.00
7,142.86 50,000.00
10,714.29 75,000.00
17,142.86 120,000.00
36,902.00 258,300.00
6,285.71 44,000.00
ton
ton/m3
1028.5
1700
3400

52,000
159,091
204,545
52,000
467,636
83,506 100,208
SIAN MANUAL 50,000.00
15,000.00
25,000.00
1,428.57
7,142.86
10,714.29
17,142.86
36,900.00
6,285.71
Kode Harga Satuan Upah Bahan Jumlah Harga
URAIAN PEKERJAAN
Analisa (Rp.) (Rp.) (Rp.) (Rp.)
P. PEKERJAAN MEUBELAIR

P.1 1 Unit Meja Siswa Tunggal


0.0400 M3 Kayu papan kelas II 4,370,000.00 174,800.00
0.2500 Kg Paku 1 - 5 cm 12,500.00 3,125.00
1.0000 Lbr Amplas 5,000.00 5,000.00
0.1000 Kg Dempul Kayu 32,500.00 3,250.00
0.0500 Bks Lem Plastik / Kayu 52,000.00 2,600.00
0.7000 Kg Politur 45,000.00 31,500.00
1.2500 Oh Tukang Kayu 93,500.00 116,875.00
Jumlah 116,875.00 220,275.00 337,150.00
P.2 1 Unit Meja Guru
0.1739 M3 Kayu papan kelas II 4,370,000.00 759,943.00
0.4167 Kg Paku 1 - 5 cm 12,500.00 5,208.75
2.0000 Lbr Amplas 5,000.00 10,000.00
1.0000 Kg Dempul Kayu 32,500.00 32,500.00
0.2000 Bks Lem Plastik / Kayu 52,000.00 10,400.00
0.7500 Kg Politur 45,000.00 33,750.00
2.2500 Oh Tukang Kayu 93,500.00 210,375.00 210,375.00
Jumlah 210,375.00 1,062,176.75 1,272,551.75
P.3 1 Unit Kursi siswa
0.0248 M3 Kayu papan kelas II 4,370,000.00 108,376.00
0.2500 Kg Paku 1 - 5 cm 12,500.00 3,125.00
1.0000 Lbr Amplas 5,000.00 5,000.00
0.1000 Kg Dempul Kayu 32,500.00 3,250.00
0.0300 Bks Lem Plastik / Kayu 52,000.00 1,560.00
0.3000 Kg Politur 45,000.00 13,500.00
1.0000 Oh Tukang Kayu 93,500.00 93,500.00 93,500.00
Jumlah 93,500.00 228,311.00 321,811.00
P.4 1 Unit Kursi Guru
0.0248 M3 Kayu papan kelas II 4,370,000.00 108,376.00
0.2700 Kg Paku 1 - 5 cm 12,500.00 3,375.00
1.2500 Lbr Amplas 5,000.00 6,250.00
0.1000 Kg Dempul Kayu 32,500.00 3,250.00
0.0300 Bks Lem Plastik / Kayu 52,000.00 1,560.00
0.5000 Kg Politur 45,000.00 22,500.00
0.0500 Lbr Triplek 3 mm 48,000.00 2,400.00
2.0000 Ls Karet Busa 30,000.00 60,000.00
2.0000 Unit imitate lear 25,000.00 50,000.00
1.2500 Oh Tukang Kayu 93,500.00 116,875.00
Jumlah 116,875.00 257,711.00 374,586.00
P.5 1 Unit White Board gantung/ standar
0.0400 M3 Kayu papan kelas II 4,370,000.00 174,800.00
0.2500 Kg Paku 1 - 5 cm 12,500.00 3,125.00
1.0000 Lbr Amplas 5,000.00 5,000.00
0.1000 Kg Dempul Kayu 32,500.00 3,250.00
0.0500 Bks Lem Plastik / Kayu 52,000.00 2,600.00
0.7000 Kg Politur 45,000.00 31,500.00
1.2500 Oh Tukang Kayu 93,500.00 116,875.00 116,875.00
Jumlah 116,875.00 337,150.00 454,025.00
P.6 1 Unit Papan Absen
0.0070 M3 Kayu papan kelas II 4,370,000.00 30,590.00
0.1200 Kg Paku 1 - 5 cm 12,500.00 1,500.00
0.5000 Lbr Amplas 5,000.00 2,500.00
Kode Harga Satuan Upah Bahan Jumlah Harga
URAIAN PEKERJAAN
Analisa (Rp.) (Rp.) (Rp.) (Rp.)
P. PEKERJAAN MEUBELAIR

P.1 1 Unit Meja Siswa Tunggal


0.0400 M3 Kayu papan kelas II 4,370,000.00 174,800.00
0.2500 Kg Paku 1 - 5 cm 12,500.00 3,125.00
1.0000 Lbr Amplas 5,000.00 5,000.00
0.1000 Kg Dempul Kayu 32,500.00 3,250.00
0.0500 Bks Lem Plastik / Kayu 52,000.00 2,600.00
0.7000 Kg Politur 45,000.00 31,500.00
1.2500 Oh Tukang Kayu 93,500.00 116,875.00
Jumlah 116,875.00 220,275.00 337,150.00
P.2 1 Unit Meja Guru
0.3000 Kg Dempul Kayu 32,500.00 9,750.00
0.3000 Bks Lem Plastik / Kayu 52,000.00 15,600.00
0.2000 Kg Politur 45,000.00 9,000.00
0.7000 Oh Tukang Kayu 93,500.00 65,450.00 65,450.00
Jumlah 65,450.00 134,390.00 199,840.00
P.7 1 Unit Papan Jadwal
0.0080 M3 Kayu papan kelas II 4,370,000.00 34,960.00
0.1200 Kg Paku 1 - 5 cm 12,500.00 1,500.00
0.5000 Lbr Amplas 5,000.00 2,500.00
0.3000 Kg Dempul Kayu 32,500.00 9,750.00
0.3000 Bks Lem Plastik / Kayu 52,000.00 15,600.00
0.2000 Kg Politur 45,000.00 9,000.00
1.0000 Oh Tukang Kayu 93,500.00 93,500.00 93,500.00
Jumlah 93,500.00 166,810.00 260,310.00
Kode Harga Satuan Upah Bahan Jumlah Harga
URAIAN PEKERJAAN
Analisa (Rp.) (Rp.) (Rp.) (Rp.)
P. PEKERJAAN MEUBELAIR

P.1 1 Unit Meja Siswa Tunggal


0.0400 M3 Kayu papan kelas II 4,370,000.00 174,800.00
0.2500 Kg Paku 1 - 5 cm 12,500.00 3,125.00
1.0000 Lbr Amplas 5,000.00 5,000.00
0.1000 Kg Dempul Kayu 32,500.00 3,250.00
0.0500 Bks Lem Plastik / Kayu 52,000.00 2,600.00
0.7000 Kg Politur 45,000.00 31,500.00
1.2500 Oh Tukang Kayu 93,500.00 116,875.00
Jumlah 116,875.00 220,275.00 337,150.00
P.2 1 Unit Meja Guru
P.8 1 Unit Papan Piket
0.0089 M3 Kayu papan kelas II 4,370,000.00 38,893.00
0.1200 Kg Paku 1 - 5 cm 12,500.00 1,500.00
0.5000 Lbr Amplas 5,000.00 2,500.00
0.3000 Kg Dempul Kayu 32,500.00 9,750.00
0.3000 Bks Lem Plastik / Kayu 52,000.00 15,600.00
0.2000 Kg Politur 45,000.00 9,000.00
1.0000 Oh Tukang Kayu 93,500.00 93,500.00 93,500.00
Jumlah 93,500.00 170,743.00 264,243.00
P.9 1 Unit Almari ruang kelas
0.1200 M3 Kayu kelas II ( papan) 4,370,000.00 524,400.00
1.0000 Kg Paku Biasa 12,500.00 12,500.00
3.0000 Lbr Ampelas 5,000.00 15,000.00
0.3000 Kg Dempul 32,500.00 9,750.00
0.3000 Bks Lem Kayu 52,000.00 15,600.00
1.5000 Kg Pelitur 45,000.00 67,500.00
2.0000 Buah Knop Tarik 35,000.00 70,000.00
4.0000 Buah Sekrup 5 cm 250.00 1,000.00
1.0000 Buah Kunci Lemari 15,000.00 15,000.00
2.0000 Buah Grendel Jendela 12,500.00 25,000.00
1.0000 Lbr Triplek 3mm 48,000.00 48,000.00
1.0000 Lbr Triplek 5mm 68,000.00 68,000.00
1.0000 Oh Tukang Kayu 93,500.00 93,500.00
Jumlah 93,500.00 871,750.00 965,250.00
P.10 1 Unit Kotak Sampah
0.0090 M3 Kayu Kelas II (Papan) 4,370,000.00 39,330.00
0.2500 Kg Paku Biasa 12,500.00 3,125.00
1.0000 Lbr Amplas 5,000.00 5,000.00
0.1000 Kg Dempul 32,500.00 3,250.00
0.1000 Bks Lem Kayu 52,000.00 5,200.00
0.1500 Kg Pelitur 45,000.00 6,750.00
1.1080 Oh Tukang Kayu 93,500.00 103,598.00
Jumlah 103,598.00 62,655.00 166,253.00
REKAPITULASI VOLUME PEKERJAAN
KEGIATAN : PEMBANGUNAN GEDUNG SEKOLAH SD / SMP
PEKERJAAN : PEMBANGUNAN RKB SDN 2 LABUHAN RATU (BERTINGKAT)
LOKASI : KOTA BANDAR LAMPUNG
TAHUN ANGGARAN : 2015

NO. URAIAN PEKERJAAN VOLUME SATUAN

I PEKERJAAN PERSIAPAN
1 Penyiapan dan pembersihan lapangan 1.00 M2
2 Pengukuran dan pasang bouwplank 83.00 M'
3 Penyediaan air / listrik untuk kerja 1.00 LS
4 Sewa Direksikeet / Gudang / Barak Kerja 6.00 Bulan
5 Pasang Papan Nama Proyek 1.00 Buah
6 Penyediaan obat-obatan (P3K) 1.00 LS
7 Job Mix Formula (JMF) Beton K-225 1.00 LS
8 Pembuatan Laporan & Dokumentasi 0%, 50%, 100% 1.00 LS
9 Mobilisasi 1.00 LS

II PEKERJAAN TANAH
1 Galian tanah pondasi foot plat, dalam 1 - 2 m 146.99 M3
2 Galian tanah pondasi menerus, dalam 0 - 1 m 90.24 M3
3 Urugan pasir bawah pondasi 10.75 M3
4 Urugan pasir bawah lantai 14.03 M3
5 Urugan tanah kembali sisi pondasi 60.51 M3
6 Urugan tanah bawah lantai dipadatkan, sisa galian 112.20 M3
7 Mengangkut tanah sisa galian keluar proyek 151.95 M3
8 Timbunan Dan Perataan sumur Lama 1.00 LS

III PEKERJAAN PASANGAN BATU DAN PLESTERAN


1 Pasang batu aanstamping 16.92 M3
2 Pasang pondasi batu belah adk campuran 1SP : 4PP 38.07 M3
3 Pasang dinding bata merah tebal ½ batu campuran 1SP :4PP 909.57 M2
4 Plesteran dinding adk. 1SP : 4PP tebal 15 mm 1,819.14 M2
5 Pekerjaan Acian 1,819.14 M2
6 Finishing profil lis / band dinding luar, t = 8 cm 32.28 M'
7 Finishing profil kolom teras 7.00 Buah
8 Finishing profil pagu
9 Finishing profil plat konsul 51.40 M'
10 Pasang batu alam ( batu paras ) dinding bawah kusen 16.14 M2
11 Saluran air Hujan pas. 1/2 bata Adk 1SP :4PP 68.40 m2
12 Plesteran saluran air hujan 68.40 m2
13 Acian Saluran Air Hujan 68.40 m2
14 Pasang Roster Semen 11.70 m2

IV PEKERJAAN BETON
1 Pek. Sloof beton 15/20
- Pek. Beton Struktur untuk Sloof Mutu Beton K250 5.00 m3
- Pek. Pembesian Sloof 15/20 559.57 Kg
- Memasang bekisting untuk sloof 66.60 m2
2 Pek. Ring Balk 15/20
- Pek. Beton Struktur untuk untuk Ring Balk mutu beton K225 4.02 m3
- Pek. Pembesian Ring Balk 15/20 423.49 Kg
- Memasang bekisting untuk Ring Balk 53.60 m2
3 Pek. Kolom Praktis 11/11 44.00 m
4 Pek. Kolom K1 40/50
- Pek Beton Struktur untuk untuk Kolom K1 40/50 mutu beton K250 19.20 m3
- Pek. Pembesian Kolom K1 40/50 3,108.66 Kg
- Memasang bekisting untuk Kolom K1 40/50 21.60 m2
5 Pek. Kolom K2 25 x 25
- Pek Beton Struktur untuk untuk Kolom K2 25/25 mutu beton K250 15.00 m3
- Pek. Pembesian Kolom K2 25/25 4,239.93 Kg
- Memasang bekisting untuk Kolom K2 25/25 30.00 m2
6 Pek. Balok B1 35/60
- Pek Beton Struktur untuk untuk Balok B1 35/60 mutu beton K250 8.82 m3
- Pek. Pembesian Balok B1 35/60 2,720.98 Kg
- Memasang bekisting untuk Balok B1 35/60 65.10 m2
7 Pek. Balok B2 20/30
- Pek Beton Struktur untuk Balok B2 20/30 mutu beton K250 8.25 m3
- Pek. Pembesian Balok B2 20/30 2,086.36 Kg
- Memasang bekisting untuk Balok B2 20/30 110.00 m2
8 Pek. Balok B3 15/25
- Pek Beton Struktur untuk Balok B3 15/25 mutu beton K250 3.38 m3
- Pek. Pembesian Balok B3 15/25 490.52 Kg
- Memasang bekisting untuk Balok B3 15/25 57.60 m2

Page 85 of 97
NO. URAIAN PEKERJAAN VOLUME SATUAN

9 Pek. Pondasi Tapak P1


- Pek Beton Struktur untuk Pondasi Tapak P1 mutu beton K250 17.29 m3
- Pek. Pembesian Pondasi Tapak P1 5,512.11 Kg
- Memasang bekisting untuk Pondasi Tapak P1 29.16 m2
10 Pek. Pondasi Telapak, P2
- Pek Beton Struktur untuk Pondasi Tapak 2 mutu beton K250 14.20 m3
- Pek. Pembesian Pondasi Tapak P2 2,668.76 Kg
- Memasang bekisting untuk Pondasi Tapak P2 25.50 m2
11 Pek. Pelat Lantai 15 cm
- Pek Beton Struktur untuk Plat Lantai mutu beton K250 31.87 m3
- Pek. Pembesian Untuk Plat Lantai 3,765.64 Kg
- Memasang bekisting untuk Plat Lantai 280.50 m2
13 Pekerjaan Tangga
- Pek. Beton Struktur tangga 6.19 m3
- Pek. Pembesian Tangga 327.52 Kg
- Pek. Bekisting untuk taangga 12.55 m2
14 Kanopi Plat Beton
Pek Beton Struktur untuk Plat Kanopi mutu beton K225 3.08 m3
- Pek. Pembesian Untuk Plat Kanopi 344.18 Kg
- Memasang bekisting untuk Plat Kanopi 30.84 m2
15 Balok Variasi / Paguk Beton
16 Balok 15/20 (penahan roster)
- Pek Beton Struktur Balok 15/20 mutu beton K225 0.59 m3
- Pek. Pembesian Untuk Balok 15/20 (penahan roster) 65.65 Kg
- Memasang bekisting untuk Balok 15/20 (penahan roster) 10.73 m2
17 Lantai Kerja 10.67 m3
18 Lantai Rabat Keliling Bangunan 10.44 m3

V PEKERJAAN LANTAI & PLAFOND


1 Pek pasangan lantai keramik 40 x 40 519.00 M2
2 Pek. Pasagan plint keramik ukuran (10 x 40) cm 254.60 M'
3 Pek pasangan lantai keramik 20x20 42.00 M2
4 Pekerjaan pemasangan dinding keramik 20x20 57.93 M2
5 Pasangan Plafond gypsum board Uk.(120x240x9) mm, tebal 9 mm 659.08 M2
6 Pasang rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon 659.08 M2
7 Pasang list plafond gysum profil 505.60 M'

VI PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pasang kusen pintu / jendela alumunium 360.42 M'
2 Pasang daun jendela rangka alumunium kaca 5 mm 23.80 M2
3 Pek. Daun Pintu Panel 23.52 M2
4 Pasang kaca tebal 5 mm 129.79 M2
5 Pintu Allumunium Km/Wc 7.20 M2
6 Pintu Besi Hollow denhgan Plat t= 8 mm 1.00 bh
VII PEKERJAAN ATAP
1 Pasang rangka atap baja ringan (zincalume) + Genteng Metal Polos + 546.12 M2
Bubungan dan Lisplang ( GRC )
VIII PEKERJAAN PENGECATAN
1 Mengecat dinding 3 x cat 1,819.14 M2
2 Mengecat plapond 3 x cat 659.08 M2
3 Pengecatan Daun Pintu panel 23.52 M2

IX PEKERJAAN KUNCI DAN PENGGANTUNG


1 Pasang kunci pintu / kunci tanam 7.00 Buah
2 Pasang kunci pintu Km/Wc 6.00 Buah
3 Pasang engsel pintu 28.00 Buah
4 Pasang door holder 14.00 Buah
5 Pasang door closer 14.00 Buah
6 Pasang engsel angin jendela (cathmen) 66.00 Buah
7 Pasang grendel pintu tanam / Kunci Slot 14.00 Buah
8 Pasang tarikan + grendel jendela (cathmen) 33.00 Buah

Page 86 of 97
NO. URAIAN PEKERJAAN VOLUME SATUAN

X PEKERJAAN SANITASI DAN PLUMBING


1 Pasang pipa instalasi air kotor PVC dia. 3 " 25.00 m'
2 Pasang pipa instalasi air kotor PVC dia. 2 " 20.00 m'
3 Pasang pipa instalasi air bersih PVC dia. 3/4 " 30.00 m'
4 Pasang kran air dia. 1/2" 6.00 bh
5 Pasang floor drain 7.00 bh
6 Pasang kloset jongkok keramik 6.00 bh
7 Pasang bak mandi fiber glas 60 x 60 cm 6.00 bh
8 Pasang Urinoir 6.00 bh
9 Pasang septic tank dan resapan 1.00 Unit

XI PEKERJAAN MEKANIKAL / ELEKTRIKAL


1 Pasang / tambah daya listrik PLN 2.200 Watt 1.00 Unit
2 Pas. Instalasi titik lampu 38.00 Titik
3 Pas. Box DP Lengkap 1 Fase 1.00 Unit
4 Pasang saklar double 17.00 Buah
5 Pasang stop kontak 8.00 Buah
6 Pasang lampu TL 18 watt + fitting persegi 38.00 Buah
7 Pasang penangkal petir : 1.00 Unit
Spit dia. 1 1/4" 3 Buah
Kabel BC 50 mm2 Fixtures
Pipa GIP dia. 3/4" 8 M'
Grounding / Arde 1 Buah

XII PEKERJAAN LAIN-LAIN


1 Pasang railling tangga pipa steinless dia. 2 " 10.07 M'
2 Perapihan dan Pembersihan Sisa Material 1.00 Ls

XIII PEKERJAAN MEUBELAIR


1 Pekerjaan Pembuatan Meja Siswa 7 Lokal @ 20 Unit 140.00 Unit
2 Pekerjaan Pembuatan Kursi Siswa 7 Lokal @ 40 Unit 280.00 Unit
3 Meja Guru 1/2 Biro Dan Kursi Jok Guru Kayu Jati 7.00 Unit
4 Lemari Kelas, 1 Pintu Kayu Jati 7.00 Unit
5 Papan Tulis Black Board Bingkai Jati 7.00 Unit
6 Papan Absen White Board Bingkai Jati 7.00 Unit
7 Kotak Sampah Papan Jati 7.00 Unit

Diperiksa Diperiksa Di Buat Oleh


Pejabat Pelaksana Teknis Kegiatan Konsultan Supervisi Kontraktor Pelaksana
(PPTK) CV.MULTI JAYA CV. PAGUN SEJAHTERA

DJUNAIDI, SH #REF! NOVE SETIAWAN


NIP. 195808121198103 1 014 Inspector Direktur

Page 87 of 97
No Diameter Berat
besi besi (Kg)
(mm)
1 6p 0.22
2 8p 0.4
3 9p 0.5
4 10p 0.62
5 12p 0.89
6 13p 1.04
7 16p 1.57
8 19p 2.23
9 22p 2.98
10 25p 3.85
11 28p 4.83
12 29p 5.19
13 32p 6.31
14 36p 7.99

Berat besi ulir per meter

No Diameter Berat
besi besi (Kg)
(mm)
1 6 0.222
2 8 0.395
3 9 0.5
4 10 0.617
5 12 0.888
6 13 1.04
7 16 1.578
8 19 2.223
9 22 2.985
10 25 3.853
11 28 4.83
12 29 5.185
13 32 6.313
14 36 7.99
RENCANA ANGGARAN BIAYA

KEGIATAN : Pengembangan Sarana Dan Prasarana Kawasan Transmigrasi


PEKERJAAN : Pembangunan Islamic Center Tahap 2
LOKASI : Rawa Pitu, Kabupaten Tulang Bawang
PROPINSI : Lampung
TAHUN ANGGARAN : 2016

NO. URAIAN PEKERJAAN ANALISA VOLUME

1 2 3 4

I Pekerjaan Persiapan
1 Pekerjaan Gudang Bahan Bangunan dan alat-alat Ls 1.00 unit
2 Pembersihan Lahan Ls 1.00 unit
3 Papan nama proyek Ls 1.00 unit
4 Administrasi , Pembuatan Laporan dan dokumentasi Ls 1.00 unit
Jumlah

III Pekerjaan Pasangan


1 Pas. dinding, pas. 1/2 bata A.4.4.1.9 481.24 m2
2 Plesteran, adk. 1 : 4 A.4.4.2.4 821.59 m2
3 Plesteraran Kamprot A.4.4.2.23 72.00 m2
3 Profilan semen A.4.4.2.28 100.00 m
4 Pas. Batu ander motif sisir A.4.4.3.57 68.90 m2
Jumlah

IV Pekerjaan Beton
1 Pas. Balok B1, 20/30 A.4.1.1.31 11.40 m3
2 Pas. Balok lengkung, 15/25 A.4.1.1.31 6.00 m3
3 Pas. Kolom K1 25 x 25 A.4.1.1.32 24.25 m3
4 Pas. Kolom K2 40 x 40 A.4.1.1.32 0.83 m3
5 Pas. Kolom K3 15/40 A.4.1.1.32 5.63 m3
4 Pas. Ringbalk 15/20 A.4.1.1.31 0.48 m3
5 Pas. Kolom Praktis 11 x 11 A.4.1.1.35 44.00 m
6 Pas. Plat Beton A.4.1.1.33a 23.22 m3
7 Pas. Listplank beton A.4.1.1.34 5.30 m3
8 Kubah plat beton 6 cm A.4.1.1.33a 1.20 m3
9 Kanopi beton, 8 cm A.4.1.1.33a 3.50 m3
Jumlah

V Pekerjaan Atap
1 Balok Kuda2 + Jurai, IWF 200 . 100 & IWF 100 . 50 A.4.2.1.2 2,531.54 kg
2 Balok Gording, C 100 . 50 A.4.2.1.1 3,294.29 kg
3 Profil L 100.75 A.4.2.1.1 520.00 kg
4 Pelat 8 mm A.4.2.1.1 130.62 kg
5 Trekstang & ikatan angin, 8 mm A.4.2.1.1 379.10 kg
6 Biaya Perakitan kuda2 baja A.4.2.1.3 6,855.56 kg
7 Rangka Atap baja ringan + genteng metal (lengkap) Ls 203.20 m2
Jumlah

VI Pekerjaan Pintu
1 Pas. Frameless door, kaca temper 12 mm (lengkap) Analisa PB 3.00 unit
2 Pasang Kusen Allumunium A.4.2.1.11 170.50 m
3 Pasang Daun jendela allumunium A.4.2.1.13a 28.80 m2
4 Pasang Kusen Kayu kls II A.4.6.1.2 0.32 m3
5 Pasang Daun Pintu Panel kayu kls II A.4.6.1.5 20.16 m2
6 Pasang Kaca polos 5 mm A.4.6.2.17 68.32 m2
7 Pintu Km/wc Ls 6.00 bh
8 Kunci 2 kali putar A.4.6.2.2 8.00 bh
9 Engsel Pintu @3 A.4.6.2.5 36.00 bh
10 Engsel jendela @2 A.4.6.2.6 40.00 bh
11 Kait Angin jendela A.4.6.2.9 20.00 bh

Jumlah

VII Pekerjaan Lantai Dan Plafond


1 Plafond Gypsum 9 mm + rangka besi hollow A.4.5.1.7a 569.00 m2
2 Pasang List Plafond gypsum A.4.5.1.8 400.00 m
3 Lantai Keramik 60 x 60 A.4.4.3.35c 530.00 m2
4 Lantai keramik 20 x 20, km/wc A.4.4.3.36 72.00 m2
5 Dinding keramik 20 x 20, km/wc A.4.4.3.54 95.00 m2
6 Pas. Dinding Marmer (pintu & mihrab) A.4.4.3.43 21.00 m2
Jumlah

VIII Pekerjaan Instalasi


1 Pas. instalasi titik lampu lengkap Ls 46.00 unit
2 Pas. lampu TL 2 x 20 watt (inbow) A.6.1.1.7 8.00 bh
3 Pas. lampu SL 20 Watt Ls 26.00 bh
4 Pas. Lampu Downlight A.6.1.1.6 12.00 bh
5 Pas. Stop Kontak A.6.1.1.5 9.00 bh
6 Pas. Saklar Ls 29.00 bh
7 Pas. Kotak DP 1 fase lengkap Ls 1.00 bh
8 Pas. Instalasi Air bersih PVC 3/4 " Ls 35.00 bh
9 Pas. Instalasi Air kotor PVC 4" Ls 12.00 bh
10 Pas. Instalasi Air kotor PVC 2" Ls 20.00 bh
11 Pas. Septictank dan resapan Ls 1.00 bh
12 Pas. Closet Jongkok Porselin Ls 6.00 bh
13 Pas. Saringan Air / Floor Drain Ls 4.00 bh
14 Pas. Keran Stenlis Ls 20.00 bh
15 Pas. Bak Air fiber Ls 6.00 bh
Jumlah

IX Pekerjaan Finishing
1 Pengecatan Dinding A.4.7.1.10 821.59 m2
2 Pengecatan kayu A.4.7.1.4 80.64 m2
3 Ornamen Kubah Ls 1.00 unit
4 Roster GRC motif Ls 91.80 m2
5 Motif Pintu Utama dg. Sandblast Ls 22.68 m2
Jumlah

JUMLAH TOTAL
A

HARGA SATUAN TOTAL HARGA


(Rp.) (Rp.)
5 6

300,000.00 300,000.00
5,000,000.00 5,000,000.00
350,000.00 350,000.00
2,500,000.00 2,500,000.00
Jumlah 8,150,000.00

1,600,000,894
92,275.00 44,406,731.39
49,466.40 40,640,937.70
54,105.20 3,895,574.40
237,492.00 23,749,200.00
201,730.00 13,899,197.00
Jumlah 126,591,640.49

7,954,605.00 90,682,497.00
7,954,605.00 47,727,630.00
7,140,432.50 173,155,488.13
7,140,432.50 5,940,839.84
7,140,432.50 40,229,196.71
7,954,605.00 3,818,210.40
98,804.50 4,347,398.00
7,140,432.50 165,822,549.56
7,488,685.00 39,684,039.55
7,140,432.50 8,568,519.00
7,140,432.50 24,991,513.75
Jumlah 604,967,881.94

27.75
31,850.00 80,629,676.40 30
25,525.00 84,086,837.33
25,525.00 13,273,000.00
25,525.00 3,334,177.60 0.01664 7850 130.62
25,525.00 9,676,527.50
480.93 3,297,069.11
100,000.00 20,320,000.00
Jumlah 214,617,287.94

6,682,000.00 20,046,000.00
70,573.00 12,032,696.50
451,620.00 13,006,656.00
7,243,500.00 2,285,758.86
538,000.00 10,846,080.00
113,717.00 7,769,145.44
450,000.00 2,700,000.00
196,525.00 1,572,200.00
36,217.00 1,303,812.00
25,807.50 1,032,300.00
42,045.00 840,900.00

Jumlah 73,435,548.80

123,856.00 70,474,064.00
22,070.00 8,828,000.00
418,024.00 221,552,720.00
202,434.00 14,575,248.00
229,288.00 21,782,360.00
512,460.40 10,761,668.40
Jumlah 347,974,060.40

300,000.00 13,800,000.00
318,200.00 2,545,600.00
70,000.00 1,820,000.00
122,950.00 1,475,400.00
65,700.00 591,300.00
65,000.00 1,885,000.00
1,500,000.00 1,500,000.00
24,000.00 840,000.00
19,000.00 228,000.00
70,000.00 1,400,000.00
5,000,000.00 5,000,000.00
45,000.00 270,000.00
40,000.00 160,000.00
26,000.00 520,000.00
350,000.00 2,100,000.00
Jumlah 34,135,300.00

17,046.50 14,005,178.15
25,265.00 2,037,369.60
1,200,000.00 1,200,000.00
200,000.00 18,360,000.00
400,000.00 9,072,000.00
Jumlah 44,674,547.75

1,454,546,267.32

1,600,000,894.05 REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : Pengembangan Sarana Dan Prasarana Kawasan Transmi


PEKERJAAN : Pembangunan Islamic Center Tahap 2
LOKASI : Rawa Pitu, Kabupaten Tulang Bawang
PROPINSI : Lampung
TAHUN ANGGARAN : 2016

NO URAIAN PEKERJAAN

I Pekerjaan Persiapan

II Pekerjaan Pasangan

III Pekerjaan Beton

IV Pekerjaan Atap

V Pekerjaan Pintu

VI Pekerjaan Lantai Dan Plafond


VII Pekerjaan Instalasi

VIII Pekerjaan Finishing

JUMLAH :
PPN 10 % :
TOTAL :
DIBULATKAN :

Satu Milyar Enam Ratus Juta Rupiah


ANGGARAN BIAYA

Prasarana Kawasan Transmigrasi

TOTAL HARGA

8,150,000.00

126,591,640.49

604,967,881.94

214,617,287.94

73,435,548.80

347,974,060.40
34,135,300.00

44,674,547.75

1,454,546,267.32
145,454,626.73
1,600,000,894.05
1,600,000,000.00

m Ratus Juta Rupiah