Anda di halaman 1dari 16

DAFTAR HARGA SATUAN UPAH KERJA

HARGA SATUAN UPAH

NO TENAGA KERJASATUANHARGA SATUAN KET

1 Mandor OH Rp 100,000.00
2 Kepala Tukang OH Rp 90,000.00
3 Tukang OH Rp 80,000.00
2 Pekerja OH Rp 65,000.00
3 Operator terlatih OH Rp 90,000.00
4 Pembantu operator OH Rp 65,000.00
5 Supir terlatih OH Rp 80,000.00
6 Pembantu supir OH Rp 50,000.00
7 Penjaga malam OH Rp 80,000.00
B HARGA BAHAN :
HARGA SATUAN (R
NO URAIAN SATUAN
HARGA SATUAN

1 Alumunium Foil M2 6,000.00


2 Amplas Lbr 8,000.00
3 Asbes Gelombang Kecil Lbr 45,000.00
4 Aspal Kg 14,500.00
5 Baja Ringan M2 330,000.00
6 Bak Mandi Fiber 50.50.5 Bh 285,000.00
7 Bak Mandi Fiber 60.60.6 Bh 300,000.00
8 Bambu Dia 6-8 cm / 600 cm Btg 9,000.00
9 Batako Bh 4,000.00
10 Batu Bata Bh 490,000.00
11 Batu Belah Hitam (Pondasi) M3 319,000.00
12 Batu Belah Putih (Pondasi) M3 290,000.00
13 Batu Belah Hitam 10/15 M3 314,000.00
14 Batu Belah Hitam 5/7 M3 346,000.00
15 Batu split 1/2 M3 386,500.00
16 Batu Split 2/3 Cm M3 380,000.00
17 Batu Split 3/5 M3 365,000.00
18 Besi Baja IWF Kg 20,000.00
19 Besi Baja Siku Kg 21,000.00
20 Besi Beton polos Kg 18,000.00
21 Besi Beton Ulir Kg 19,000.00
22 Box Meter Unt 75,000.00
23 Box Zekering/ Termis 2 group Bh 145,000.00
24 Box Zekering/ Termis 3 group Bh 175,000.00
25 Bubungan Genteng Beton Bh 8,800.00
26 Bubungan Genteng Kodok Bh 5,300.00
27 Bubungan Genteng Mantili Bh 4,500.00
28 Bubungan Genteng Plentong Bh 5,600.00
29 Bubungan Genteng Zincalume pasir M' 70,000.00
30 Bubungan Genteng Zincalume polos M' 40,000.00
31 Cat Besi Kg 42,000.00
32 Cat Dasar Kg 24,500.00
33 Cat Genteng Kg 50,000.00
34 Cat Kayu Kg 51,000.00
35 Cat Meni kayu Kg 24,500.00
36 Cat Taman Kg 60,000.00
37 Cat Tembok Kg 22,000.00
38 Dempul Kg 30,000.00
39 Engsel Jendela Psg 26,000.00
40 Engsel Pintu Psg 32,000.00
41 Eternit (240 x 120 x 0,9)cm M2 45,000.00
38 Genteng Beton Bh 7,750.00
39 Genteng Bitumen Bergelombang (260x95x0,8 Lbr 146,000.00
40 Genteng Bitumen Bergelombang (106x40x0,8 Lbr 45,500.00
41 Genteng Mantili Bh 1,650.00
42 Genteng Metal Zincalume pasir M2 70,000.00
43 Genteng Metal Zincalume polos M2 100,000.00
44 Genteng Plentong Bh 1,250.00
45 Genteng Ridge (100x50x0,80)cm Lbr 75,000.00
46 Gypsum 9 mm Lbr 77,000.00
47 Glass Block Bh 22,500.00
48 Glass Block Bh 20,000.00
49 Grendel Jendela Set 18,000.00
50 Grendel Pintu Bh 62,000.00
51 Hak Angin / Pengkait Set 12,000.00
52 Harplek 1 x 1m Lbr 25,000.00
53 Kabel Pompa 3 x 2,5 mm M' 25,500.00
54 Kabel Listrik NYM 2 x 1,5 mm Roll 400,000.00
55 Kabel Listrik NYM 2 x 2,5 mm Roll 675,000.00
56 Kabel Listrik NYM 3 x 2,5 mm Roll 750,000.00
57 Kaca Bening 3 mm M2 121,000.00
58 Kaca Bening 5 mm M2 143,000.00
59 Kaca Es 3 mm M2 85,000.00
60 Kaca Patri M2 1,650,000.00
61 Kaca Rayban 5 mm M2 172,000.00
62 Kastin Cetak Bh 7,000.00
63 Kawat Beton Kg 30,000.00
64 Kawat Bronjong Kg 32,000.00
65 Kawat Duri Kg 16,000.00
66 Kawat Harmonika M2 17,500.00
67 Kawat Nyamuk M2 27,000.00
68 Kayu Bakar M3 450,000.00
69 Kayu Balok kls.I M3 7,000,000.00
70 Kayu Balok kls.II M3 2,800,000.00
71 Kayu Balok kls.III M3 2,400,000.00
72 Kayu Balok kls.IV M3 2,000,000.00
73 Kayu Dolken Btg 17,500.00
74 Kayu Kasau kls.I M3 7,000,000.00
75 Kayu Kasau kls.II M3 3,000,000.00
76 Kayu Kasau kls.III M3 2,500,000.00
77 Kayu Kasau kls.IV M3 2,100,000.00
78 Kayu Papan kls.I M3 7,750,000.00
79 Kayu Papan kls.II M3 3,150,000.00
80 Kayu Papan kls.III M3 2,500,000.00
81 Kayu Papan kls.IV M3 2,100,000.00
82 Kayu Reng kls.I M3 7,000,000.00
83 Kayu Reng kls.II M3 3,000,000.00
84 Kayu Reng kls.III M3 2,500,000.00
85 Kayu Reng kls.IV M3 2,100,000.00
86 Keramik 10/20 Polos M2 57,000.00
87 Keramik 20/20 Polos M2 57,000.00
Keramik 20/20 Warna M2 54,000.00
88 Keramik 20/25 Polos M2 58,000.00
89 Keramik 20/25 Warna M2 62,000.00
90 Keramik 30/30 Polos M2 62,500.00
91 Keramik 30/30 Warna M2 62,500.00
92 Keramik 40/40 Polos M2 65,000.00
93 Keramik 40/40 Warna M2 71,000.00
94 Keramik 50/50 Polos M2 70,000.00
95 Keramik 50/50 Warna M2 72,000.00
96 Kloset Duduk Keramik (Natural) M2 2,500,000.00
97 Kloset Jongkok Keramik Bh 230,000.00
98 Knee / socket / tee PVC 1/2" Bh 5,000.00
99 Knee / socket / tee PVC 3/4" Bh 3,500.00
100 Knee / socket / tee PVC 1" Bh 4,000.00
101 Knee / socket / tee PVC 2" Bh 9,500.00
102 Knee / socket / tee PVC 3" Bh 11,300.00
103 Kran 1/2" (Stainless) Bh 37,000.00
104 Kran 3/4" (Stainless) Bh 37,000.00
105 Kunci Tanam 1 x Putar Bh 110,000.00
106 Kunci Tanam 2 x Putar Bh 185,000.00
107 Lampu Hias / sorot Bh 85,000.00
108 Lampu Pijar 25 Watt Bh 15,500.00
109 Lampu SL 18 Watt Bh 36,000.00
110 Lampu TL 25 Watt Bh 45,000.00
111 List Gypsum 5 cm M' 19,500.00
112 List Gypsum 10cm M' 17,500.00
113 List Gypsum 15 cm M' 20,000.00
114 List Gypsum 20 cm M' 25,000.00
115 Mangkokan Listrik (Durados) Bh 15,000.00
116 Marmer 30/30 M2 252,000.00
117 Marmer 40/40 M2 232,000.00
118 Marmer 50/50 M2 377,000.00
119 Marmer 60/60 M2 597,000.00
120 Minyak Bensin (Premium) Ltr 7,500.00
121 Minyak Bensin Non Subsidi Ltr 10,950.00
122 Minyak Cat Ltr 27,000.00
123 Minyak Pelumas / Oli Ltr 32,500.00
124 Minyak Solar Subsidi Ltr 6,900.00
125 Minyak Solar Non Subsidi (Industri) Ltr 12,500.00
126 Minyak Thinner Ltr 22,000.00
127 Multiplek 9 mm Lbr 215,000.00
128 Multiplek 12mm Lbr 230,000.00
129 Nok Asbes Set 40,000.00
130 Paku Kg 19,000.00
131 Paku Asbes Kg 38,500.00
132 Paku Cacing Kg 26,500.00
133 Paku Seng Kg 29,000.00
134 Paku Skrup Kg 25,000.00
135 Paku Triplek Kg 27,500.00
135 Panel Pompa Unt 2,500,000.00
136 Pas.Instalasi Listrik Titik 61,000.00
137 Pasir Beton M3 185,000.00
138 Pasir Pasang M3 170,000.00
139 Pasir Urug M3 135,000.00
140 Paving Block T = 6 cm Bh 2,200.00
141 Paving Block T = 8 CMM Bh 2,400.00
142 Penangkal Petir Unt 2,700,000.00
143 Pipa GIP (Galvanis) 1/2" Btg 185,000.00
144 Pipa GIP (Galvanis) 3/4" Btg 235,000.00
145 Pipa GIP (Galvanis) 1" Btg 361,000.00
146 Pipa GIP (Galvanis)1 1/4" Btg 476,000.00
147 Pipa GIP (Galvanis) 2" Btg 746,000.00
148 Pipa GIP (Galvanis) 4" Btg 1,780,000.00
149 Pipa GIP (Galvanis) 6" Btg 2,852,000.00
150 Pipa PVC 1/2" Btg 25,000.00
151 Pipa PVC 3/4" Btg 35,000.00
152 Pipa PVC 1" Btg 45,000.00
153 Pipa PVC 2" Btg 90,000.00
154 Pipa PVC 3" Btg 150,000.00
155 Pipa PVC 4" Btg 250,000.00
156 Plamir Tembok Kg 38,000.00
157 Plitur Jadi Ltr 60,000.00
158 Polycarbonat Lbr 235,000.00
159 Reservoir Tower Air Fiber 0,50 Ms Bh 975,000.00
160 Reservoir Tower Air Fiber 1,00 Ms Bh 1,655,000.00
161 Rolling Door M2 500,000.00
162 Roster Beton 15/20 Bh 24,000.00
163 Rumput Gajah Mini / Australia M2 27,000.00
164 Rumput Golf M2 28,500.00
165 Saklar Tunggal Bh 30,000.00
166 Saklar Double Bh 35,000.00
167 Saklar Triple Bh 45,000.00
168 Saringan Air / Floor drain stainless Bh 22,500.00
169 Sekrup 6,50 cm Bh 1,100.00
170 Semen PC (50KG) Zak 74,000.00
171 Semen Putih (50kg) Zak 105,000.00
172 Seng Gelombang BJLS 27 Lbr 52,500.00
173 Seng Gelombang BJLS 30 Lbr 55,000.00
174 Seng Plat BJLS 27 Lbr 36,750.00
175 Seng Plat Bjls 30 Lbr 32,500.00
176 Sewa Stemper Kodok Hk 225,000.00
177 Soda Api Kg 27,500.00
178 Stop Kontak Bh 30,000.00
179 Talang Fiber M' 34,000.00
180 Tali Ijuk Kg 12,500.00
181 Tanah Urug Pilihan M3 55,000.00
182 Tarikan Jendela Bh 17,000.00
183 Teakwood 5 mm Lbr 240,000.00
184 Teer / Residu Ltr 14,000.00
185 Triplek 3 mm Lbr 65,000.00
186 Triplek 5 mm Bh 87,000.00
187 Urinoir Keramik Lengkap Bh 2,190,000.00
188 Washtafel Keramik Lengkap Bh 1,500,000.00
189 Water Meter Bh 462,000.00
HARGA SATUAN (RP)
KETERANGAN
PAJAK (PPN 10%) TERMASUK PAJAK

600.00 6,600.00
800.00 8,800.00
4,500.00 49,500.00
1,450.00 15,950.00
33,000.00 363,000.00
28,500.00 313,500.00
30,000.00 330,000.00
900.00 9,900.00
400.00 4,400.00
49,000.00 539,000.00
31,900.00 350,900.00
29,000.00 319,000.00
31,400.00 345,400.00
34,600.00 380,600.00
38,650.00 425,150.00 AABI 2016
38,000.00 418,000.00
36,500.00 401,500.00
2,000.00 22,000.00
2,100.00 23,100.00
1,800.00 19,800.00
1,900.00 20,900.00
7,500.00 82,500.00
14,500.00 159,500.00
17,500.00 192,500.00
880.00 9,680.00
530.00 5,830.00
450.00 4,950.00
560.00 6,160.00
7,000.00 77,000.00
4,000.00 44,000.00
4,200.00 46,200.00
2,450.00 26,950.00
5,000.00 55,000.00
5,100.00 56,100.00
2,450.00 26,950.00
6,000.00 66,000.00
2,200.00 24,200.00
3,000.00 33,000.00
2,600.00 28,600.00
3,200.00 35,200.00
4,500.00 49,500.00
3,300.00 36,300.00
14,600.00 160,600.00
4,550.00 50,050.00
165.00 1,815.00
7,000.00 77,000.00
10,000.00 110,000.00
125.00 1,375.00
7,500.00 82,500.00
7,700.00 84,700.00
2,250.00 24,750.00
2,000.00 22,000.00
1,800.00 19,800.00
6,200.00 68,200.00
1,200.00 13,200.00
2,500.00 27,500.00
2,550.00 28,050.00
40,000.00 440,000.00
67,500.00 742,500.00
75,000.00 825,000.00
12,100.00 133,100.00
14,300.00 157,300.00
8,500.00 93,500.00
165,000.00 1,815,000.00
17,200.00 189,200.00
700.00 7,700.00
3,000.00 33,000.00
3,200.00 35,200.00
1,600.00 17,600.00
1,750.00 19,250.00
2,700.00 29,700.00
45,000.00 495,000.00
700,000.00 7,700,000.00
280,000.00 3,080,000.00
240,000.00 2,640,000.00
200,000.00 2,200,000.00
1,750.00 19,250.00
700,000.00 7,700,000.00
300,000.00 3,300,000.00
25,000.00 2,525,000.00
210,000.00 2,310,000.00
775,000.00 8,525,000.00 AABI 2016
315,000.00 3,465,000.00
250,000.00 2,750,000.00
210,000.00 2,310,000.00
700,000.00 7,700,000.00
300,000.00 3,300,000.00
250,000.00 2,750,000.00
210,000.00 2,310,000.00
5,700.00 62,700.00
5,700.00 62,700.00
5,400.00 59,400.00
5,800.00 63,800.00
6,200.00 68,200.00
6,250.00 68,750.00
6,250.00 68,750.00
6,500.00 71,500.00
7,100.00 78,100.00
7,000.00 77,000.00
7,200.00 79,200.00
250,000.00 2,750,000.00
23,000.00 253,000.00
500.00 5,500.00
350.00 3,850.00
400.00 4,400.00
950.00 10,450.00
1,130.00 12,430.00
3,700.00 40,700.00
3,700.00 40,700.00
11,000.00 121,000.00
18,500.00 203,500.00
8,500.00 93,500.00
1,550.00 17,050.00
3,600.00 39,600.00
4,500.00 49,500.00
1,950.00 21,450.00
1,750.00 19,250.00
2,000.00 22,000.00
2,500.00 27,500.00
1,500.00 16,500.00
25,200.00 277,200.00
23,200.00 255,200.00
37,700.00 414,700.00
59,700.00 656,700.00
750.00 8,250.00
1,095.00 12,045.00
2,700.00 29,700.00
3,250.00 35,750.00
690.00 7,590.00
1,250.00 13,750.00
2,200.00 24,200.00
21,500.00 236,500.00
23,000.00 253,000.00
4,000.00 44,000.00
1,900.00 20,900.00
3,850.00 42,350.00
2,650.00 29,150.00
2,900.00 31,900.00
2,500.00 27,500.00
2,750.00 30,250.00
250,000.00 2,750,000.00
6,100.00 67,100.00
18,500.00 203,500.00
17,000.00 187,000.00
13,500.00 148,500.00
220.00 2,420.00
240.00 2,640.00
270,000.00 2,970,000.00
18,500.00 203,500.00
23,500.00 258,500.00
36,100.00 397,100.00
47,600.00 523,600.00
74,600.00 820,600.00
178,000.00 1,958,000.00
285,200.00 3,137,200.00
2,500.00 27,500.00
3,500.00 38,500.00
4,500.00 49,500.00
9,000.00 99,000.00
15,000.00 165,000.00
25,000.00 275,000.00
3,800.00 41,800.00
6,000.00 66,000.00
23,500.00 258,500.00
97,500.00 1,072,500.00
165,500.00 1,820,500.00
50,000.00 550,000.00
2,400.00 26,400.00
2,700.00 29,700.00
2,850.00 31,350.00
3,000.00 33,000.00
3,500.00 38,500.00
4,500.00 49,500.00
2,250.00 24,750.00
110.00 1,210.00
7,400.00 81,400.00
10,500.00 115,500.00
5,250.00 57,750.00
5,500.00 60,500.00
3,675.00 40,425.00
3,250.00 35,750.00
22,500.00 247,500.00
2,750.00 30,250.00
3,000.00 33,000.00
3,400.00 37,400.00
1,250.00 13,750.00
5,500.00 60,500.00
1,700.00 18,700.00
24,000.00 264,000.00
1,400.00 15,400.00
6,500.00 71,500.00
8,700.00 95,700.00
219,000.00 2,409,000.00
150,000.00 1,650,000.00
46,200.00 508,200.00
tinggi lebar panjang luas

Luas box culvert 3 3.9 68

Badan Box
Galian 0.5436 3.9 68
Pasangan batu kosong 0.1 3.9 68
Lantai kerja 0.2 3.9 68
Pengecoran box 0.35 3.7 68
0.35 0.35 68 0.245

Pembesian

Wingwall (Inlet & Outlet)


Galian Inlet 1.931 7.1 5
Galian Outlet 1.837 7.1 5
pasangan batu kosong 0.2 0.55 3.9
0.2 4.8 3.9
0.2 0.25 3.9
0.2 1.05 2.8

Lantai kerja 0.1 0.55 3.9


0.1 4.8 3.9
0.1 0.25 3.9

beton kelas c 0.2 0.55 3.9


0.2 5 3.9
0.3 0.2 3.9

urugan pasir 0.1 1.75 2.7


0.1 0.4 2.7
0.1 1.05

pasangan batu belah 2.7 2.8 0.2 3.78


2.7 0.4 0.2

pembesian
volume satuan

144.1627 m3
26.52 m3
53.04 m3
176.12
16.66
192.78 m3

68.5505 m3
65.2135 m3
0.429
3.744
0.195
0.588
4.956 m3
0.2145
1.872
0.0975
2.184 m3
0.429
3.9
0.234
4.563 m3

0 m3
0.756
0.216
0.972 m3
No Uraian Pekerjaan

A PELAKSANAAN PEKERJAAN
I PERSIAPAN
1 Mobilisasi
2 Pagar proyek
3 Pembuatan direksi keet dan gudang material
4 Pengukuran, pasang patok profil track dan gambar / m'
5 Pembuatan papan nama proyek
6 Penerangan lengkap peralatan direksi
7 Perlengkapan keamanan pekerja
8 Penjagaan keamanan lingkungan pekerjaan

II PEKERJAAN BOX CULVERT ( 2x3 m)


a Badan Box Culvert
1 Galian Struktur kedalaman 0 - 2 m
2 Galian Struktur kedalaman 2 - 4 m
3 Galian Struktur kedalaman 4 - 6 m
4 Pasangan batu kosong (Blinding Stone)
5 Beton Struktur Kelas E
6 Batang Baja tulangan Ulir BJTD-40
7 Beton Struktur Kelas C-2 (Gorong-gorong Kotak)
8 Batang Baja tulangan Ulir BJTD-40
9 Beton Struktur Kelas C-2 (Gorong-gorong Kotak)

III WINGWALL BOX CULVERT (INLET)


1 Galian Struktur kedalaman 0 - 2 m
2 Galian Struktur kedalaman 2 - 4 m
3 Galian Struktur kedalaman 4 - 6 m
4 Pasangan batu kosong (Blinding Stone)
5 Beton Struktur Kelas E
6 Batang Baja tulangan Ulir BJTD-40
7 Beton Struktur Kelas C-2 (Gorong-gorong Kotak)

IV WINGWALL BOX CURLVERT (OUTLET)


Galian Struktur kedalaman 0 - 2 m
Galian Struktur kedalaman 2 - 4 m
Galian Struktur kedalaman 4 - 6 m
Pasangan batu kosong (Blinding Stone)
Beton Struktur Kelas E
Batang Baja tulangan Ulir BJTD-40
Beton Struktur Kelas C-2 (Gorong-gorong Kotak)

B PEKERJAAN PENYELESAIAN
1 Demobilisasi
2 Pembersihan lokasi / lapangan
3 Dokumentasi dan gambar akhir
4 Pengadaan dan Pemasangan Balas
Volume Satuan Harga Satuan Jumlah
Pekerjaan Rp. Rp.