Anda di halaman 1dari 512

DAFTAR

HARGA DASAR SATUAN BAHAN


HARGA
No. SATUAN SATUAN
( Rp.)

1 Pasir Pasang M3 145,000.00


2 Pasir Beton M3 145,000.00
3 Batu Pecah 0 - 5 mm M3 157,200.00
4 Pasir Urug M 3 98,000.00
5 Batu Pecah 5 - 10 mm M3 175,800.00
6 Batu Belah M3 134,100.00
7 Batu Pecah 10 - 20 mm M 3 177,400.00
8 Batu Pecah 20 - 30 mm M3 174,300.00
9 Batu Pecah 30 - 50 mm M3 167,200.00
10 Batu Pecah 50 - 70 mm M 3 161,700.00
11 Agregat Halus M3 157,200.00
12 Filler Kg 400.00
13 Batu Belah / Kerakal M3 134,100.00
14 Gravel M3
15 Bahan Tanah Timbunan M3 37,100.00
16 Bahan Pilihan M3 49,500.00
17 Aspal Kg 8,510.00
18 Kerosen / Minyak Tanah Liter 5,681.80
19 Semen Holcim (50Kg) Zak 54,000.00
20 Semen Holcim (Kg) Kg 1,080.00
21 Besi Beton Kg 9,570.00
22 Kawat Beton Kg 16,000.00
23 Kawat Bronjong Kg 20,600.00
24 Sirtu M3 98,200.00
25 Cat Marka (Non Thermoplas) Kg
26 Cat Marka (Thermoplastic) Kg 105,000.00
27 Paku Kg 12,300.00
28 Kayu Perancah M3 2,925,600.00
29 Bensin Liter 4,913.50
30 Solar Liter 4,383.00
31 Minyak Pelumas / Olie Liter 45,000.00
32 Plastik Filter M2
33 Pipa Galvanis Dia. 1.6" Batang
34 Pipa Porus M'
35 Agregat Kelas A M3 149,500.00
36 Agregat Kelas B M 3 148,300.00
37 Agregat Kelas C M3 142,400.00
38 Agregat Kelas C2 M3
39 Geotextile M2
40 Aspal Emulsi Kg 8,510.00
41 Gebalan Rumput M 2 16,500.00
42 Thinner Liter 17,600.00
43 Glass Bead Kg 17,600.00
44 Pelat Rambu (Eng. Grade) Buah
45 Pelat Rambu (High I. Grade) Buah
46 Rel Pengaman (Guard Rails) M' 869,000.00
T End Rel Pengaman (Guard Rails) bh 633,000.00
47 Beton K-250 M3 873,063.41
48 Baja Tulangan (Polos) U24 Kg 9,570.00
49 Baja Tulangan (Ulir) D32 Kg 9,570.00
50 Kapur M3 78,500.00
51 Chipping M3
52 Chipping (Kg) Kg -
53 Cat Kg 32,100.00
54 Pemantul Cahaya (Reflector) Buah
55 Pasir Urug M3 88,000.00
56 Arbocell Kg
57 Baja Bergelombang Kg
58 Beton K-125 M3 797,527.57
59 Baja Struktur Kg 17,600.00
60 Tiang Pancang Baja M'
61 Tiang Pancang Beton Pratekan Ø 500 mm M3 4,152,850.00
62 Kawat Las Dos 17,300.00
63 Pipa Baja Kg
64 Minyak Fluks Liter 5,681.80
65 Bunker Oil Liter
66 Asbuton Halus Ton
67 Baja Prategang Kg
68 Baja Tulangan (Polos) U32 Kg 9,570.00
69 Baja Tulangan (Ulir) D39 Kg 9,570.00
70 Baja Tulangan (Ulir) D48 Kg 9,570.00
71 PCI Girder L = 12,6 m Buah 60,000,000.00
72 PCI Girder L = 13,6 m Buah 63,000,000.00
73 PCI Girder L = 14,6 m Buah 68,000,000.00
74 PCI Girder L = 15,6 m Buah 71,000,000.00
75 PCI Girder L = 16,6 m Buah 76,000,000.00
76 PCI Girder L = 17,6 m Buah 84,000,000.00
PCI Girder L = 18,6 m Buah 87,000,000.00
PCI Girder L = 19,6 m Buah 91,000,000.00
PCI Girder L = 20,6 m Buah 95,000,000.00
PCI Girder L = 21,6 m Buah 100,000,000.00
PCI Girder L = 22,6 m Buah 133,000,000.00
PCI Girder L = 23,6 m Buah 137,000,000.00
PCI Girder L = 24,6 m Buah 142,000,000.00
PCI Girder L = 25,6 m Buah 148,000,000.00
PCI Girder L = 26,6 m Buah 153,000,000.00
PCI Girder L = 27,6 m Buah 159,000,000.00
PCI Girder L = 28,6 m Buah 163,000,000.00
PCI Girder L = 29,6 m Buah 176,000,000.00
PCI Girder L = 30,8 m Buah 221,000,000.00
PCI Girder L = 31,8 m Buah 227,000,000.00
PCI Girder L = 32,8 m Buah 235,000,000.00
PCI Girder L = 33,8 m Buah 243,000,000.00
PCI Girder L = 34,8 m Buah 250,000,000.00
PCI Girder L = 35,8 m Buah 273,000,000.00
PCI Girder L = 36,8 m Buah 284,000,000.00
PCI Girder L = 37,8 m Buah 292,000,000.00
PCI Girder L = 38,8 m Buah 301,000,000.00
PCI Girder L = 39,8 m Buah 311,000,000.00
PCI Girder L = 40,8 m Buah 318,000,000.00
77 Beton K-300 M3 993,975.00
78 Beton K-175 M3 849,215.51
79 Cerucuk M'
80 Elastomer Buah 324,000.00
81 Bahan pengawet: kreosot Liter
82 Mata Kucing Buah
83 Anchorage Buah
84 Anti strpping agent Liter 17,600.00
85 Bahan Modifikasi Kg
86 Beton K-500 M3 1,128,837.21
87 Beton K-400 M3 1,018,019.92
88 Ducting (Kabel prestress) M'
89 Ducting (Strand prestress) M'
90 Beton K-350 M3 994,847.31
91 Multipleks 12 mm Lbr 125,300.00
92 Elastomer (300 x 350 x 36) Buah 567,000.00
93 Elastomer (350 x 400 x 39) Buah 819,000.00
94 Elastomer (400 x 450 x 45) Buah 1,215,000.00
Elastomer (400 x 550 x 80) Buah 2,640,000.00
Elastomer (400 x 300 x 40) Buah 720,000.00
Elastomer (500 x 500 x 60) Buah 2,250,000.00
95 Expansion Tipe Joint Asphaltic Plug M' 750,000.00
96 Expansion Join Tipe Rubber M'
97 Expansion Join Baja Siku M'
98 Marmer Buah
99 Kerb Type A Buah 35,000.00
100 Paving Block M2 165,000.00
101 Mini Timber Pile Buah
102 Expansion Joint Tipe Torma M'
103 Strip Bearing Buah
104 Joint Socket Pile 35x35 Set
105 Joint Socket Pile 16x16x16 Set
106 Mikro Pile 16x16x16 M'
107 Matras Concrete Buah
108 Assetilline Botol
109 Oxygen Botol
110 Batu Bara Kg
111 Pipa Galvanis Dia 3" M' 88,300.00
112 Pipa Galvanis Dia 2,0" M' 56,600.00
113 Pipa Galvanis Dia 2,5" M' 72,500.00
114 Pipa Galvanis Dia 4,0" M' 105,600.00
115 Agregat Pecah Mesin 0-5 mm M3 157,200.00
116 Agregat Pecah Mesin 10-20 mm M3 177,400.00
117 Agregat Pecah Mesin 20-30 mm M 3 174,300.00
118 Joint Sealent 0 37,100.00
119 Cat Anti Karat 0 32,100.00
120 Expansion Cap M2 6,050.00
121 Polytene 125 mikron Kg 19,250.00
122 Curing Compound Ltr 38,500.00
123 Kayu Acuan M3 1,363,600.00
124 Additive Ltr 38,500.00
125 Casing M2 565,200.00
126 AC-BASE Ton 846,700.00
127 AC-BC Ton 856,800.00
128 AC-WC Ton 875,200.00
129 HRS-WC Ton 891,500.00
130 LATASIR (SS) Ton 1,100,000.00
COOLMIX Ton 907,500.00
131 BETON K-500 Readymix M3 874,500.00
132 BETON K-400 Readymix M3 737,000.00
133 BETON K-350 Readymix M 3 717,800.00
134 BETON K-300 Readymix M3 695,800.00
135 Prasasti 40 cm x 60 cm Bh 500,000.00
136 Prasasti 20 cm x 30 cm Bh 200,000.00
137 Side Entry Pit Titik Tangkap Drainase Jalan) Bh 467,500.00
138 Saluran Beton Pracetak Dim 50-50 M' 319,000.00
139 Saluran Beton Pracetak Dim 50-70 M' 386,000.00
Penutup Saluran Beton Pracetak Dim 50 198,000.00
140 Saluran Beton Pracetak Dim 60-70 M' 418,000.00
Penutup Saluran Beton Pracetak Dim 60 240,000.00
141 Saluran Beton Pracetak Dim 100-100 M' 950,000.00
Penutup Saluran Beton Pracetak Dim 100 468,000.00
142 Box Culvert Pracetak Dim. 50-50 M' 719,000.00
143 Box Culvert Pracetak Dim. 60-60 M' 947,000.00
144 Box Culvert Pracetak Dim. 80-80 M' 1,549,000.00
145 Box Culvert Pracetak Dim. 100-100 M' 2,044,000.00
146 Box Culvert Pracetak Dim. 150-150 M' 4,115,000.00
Box Culvert Pracetak Dim. 200-200 M' 5,923,000.00
Box Culvert Pracetak Dim. 220-160 M' 6,049,000.00
147 Pipa PVC dia 6" M' 125,000.00
148 Pipa PVC dia 4" M' 28,200.00
149 Pipa PVC dia 2" M' 11,500.00
150 Pipa PVC dia 1,5" M' 8,200.00
151 Pipa PVC dia 1" M' 6,600.00
152 Meni Besi Kg 18,700.00
153 Triplek tb. 6 mm Lbr 68,000.00
154 Baud Bh 5,000.00
155 Seng Plat 3 x 6 BWG 30 Lbr 32,700.00
156 Besi Profil Kg 11,100.00
157 Batang Kelapa Btg 294,300.00
158 Karung Plastik BH 2,500.00
159 Bambu dia. 7 - 10 cm btg 15,000.00
Diafragma Pracetak K350 H 0,90 Bh 2,200,000.00
Diafragma Pracetak K350 H 1,25 Bh 3,400,000.00
Diafragma Pracetak K350 H 1,60 Bh 3,500,000.00
Diafragma Pracetak K350 H 1,70 Bh 3,500,000.00
Diafragma Pracetak K350 H 2,10 Bh 4,000,000.00
Plat Deck Pracetak M2 700,000.00
Lime Stone M3 140,000.00
Batu Ornamen M2 100,000.00
CTB M3 577,500.00
160 Kantor Ls 1,500,000.00
161 Barak Ls 1,250,000.00
162 Bengkel Ls
163 Gudang, dan lain-lain Ls 1,250,000.00
DAFTAR
N HARGA SEWA ALAT

KETERANGAN No. NAMA ALAT SATUAN

Base Camp 1 ASPHALT MIXING PLANT Hari


Base Camp 2 ASPHALT FINISHER Hari
Base Camp 3 ASPHALT SPRAYER Hari
Base Camp 4 BULLDOZER D3B CATERPILLAR Hari
5 COMPRESSOR 4000-6500 L\M Hari
Lokasi Pekerjaan 6 CONCRETE MIXER 0.3 - 0.6 M3 Hari
Base Camp 7 TRUCK CRANE 20 TON Hari
8 DUMP TRUCK 26 TON Hari
9 DUMP TRUCK 10 TON Hari
10 EXCAVATOR KOBELCO SK-024 Hari
Base Camp 11 FLAT BED TRUCK 3-4 M3 Hari
Proses/Base Camp 12 GENERATOR SET Hari
Lokasi Pekerjaan 13 MOTOR GRADER >100 HP Hari
Base Camp 14 TRACK LOADER 75-100 HP Hari
Borrow Pit/quarry 15 WHEEL LOADER 1.0-1.6 M3 Hari
Quarry 16 THREE WHEEL ROLLER 6-8 T Hari
Base Camp 17 TANDEM ROLLER 6-8 T. Hari
Base Camp 18 TIRE ROLLER 8-10 T. Hari
Base Camp 19 VIBRATORY ROLLER 5-8 T. Hari
Base Camp 20 CONCRETE VIBRATOR Hari
Lokasi Pekerjaan 21 ROAD MARKING MACHINE Hari
Lokasi Pekerjaan 22 WATER PUMP 70-100 mm Hari
Lokasi Pekerjaan 23 WATER TANKER 3000-4500 L. Hari
Lokasi Pekerjaan 24 PEDESTRIAN ROLLER Hari
Lokasi Pekerjaan 25 TAMPER Hari
Lokasi Pekerjaan 26 JACK HAMMER Hari
Lokasi Pekerjaan 27 FULVI MIXER Hari
Lokasi Pekerjaan 28 CONCRETE PUMP Hari
Pertamina 29 TRAILER 20 TON Hari
Pertamina 30 PILE DRIVER + HAMMER Hari
Pertamina 31 CRANE ON TRACK 35 TON Hari
Lokasi Pekerjaan 32 WELDING SET Hari
Lokasi Pekerjaan 33 BORE PILE MACHINE Hari
Lokasi Pekerjaan 34 ASPHALT LIQUID MIXER Hari
Base Camp 35 TRONTON Hari
Base Camp 36 COLD MILLING Hari
Base Camp 37 ROCK DRILL BREAKER Hari
Tidak tersedia 38 COLD RECYCLER Hari
Lokasi Pekerjaan 39 HOT RECYCLER Hari
Base Camp 40 AGGREGAT (CHIP) SPREADER Hari
Lokasi Pekerjaan 41 ASPHALT DISTRIBUTOR Hari
Lokasi Pekerjaan 42 SLIP FORM PAVER Hari
Lokasi Pekerjaan 43 CONCRETE PAN MIXER Hari
Lokasi Pekerjaan 44 CONCRETE BREAKER Hari
Lokasi Pekerjaan 45 ASPAHLT TANKER Hari
Lokasi Pekerjaan 46 CEMENT TANKER Hari
47 CONDRETE MIXER (350) Hari
Lokasi Pekerjaan 48 VIBRATING RAMMER Hari
Lokasi Pekerjaan 49 TRUK MIXER (AGITATOR) Hari
Lokasi Pekerjaan 50 BORE PILE MACHINE Hari
Hasil Proses 51 CRANE ON TRACK 75-100 TON Hari
Base Camp 52 BLENDING EQUIPMENT Hari
Base Camp 53 ASPHALT LIQUID MIXER Hari
Base Camp 54 BARRIER LIFT Hari
Base Camp 55 Crane Kobelco 7055 (Crawler) Hari
Base Camp
Base Camp DAFTAR
Lokasi Pekerjaan HARGA MOBILISASI ALAT
Lokasi Pekerjaan
Pelabuhan terdekat
Lokasi Pekerjaan No. NAMA ALAT SATUAN
Pelabuhan terdekat
Lokasi Pekerjaan
Pelabuhan terdekat 1 ASPHALT MIXING PLANT Jam
Base Camp 2 ASPHALT FINISHER Jam
Base Camp 3 ASPHALT SPRAYER Jam
Base Camp 4 BULLDOZER D3B CATERPILLAR Jam
Base Camp 5 COMPRESSOR 4000-6500 L\M Jam
Lokasi Pekerjaan 6 CONCRETE MIXER 0.3 - 0.6 M3 Jam
Lokasi Pekerjaan 7 TRUCK CRANE 20 TON Jam
Lokasi Pekerjaan 8 DUMP TRUCK 26 TON Jam
Pelabuhan terdekat 9 DUMP TRUCK 10 TON Jam
Pelabuhan terdekat 10 EXCAVATOR KOBELCO SK-024 Jam
Pelabuhan terdekat 11 FLAT BED TRUCK 3-4 M3 Jam
Pelabuhan terdekat 12 GENERATOR SET Jam
Pelabuhan terdekat 13 MOTOR GRADER >100 HP Jam
Pelabuhan terdekat 14 TRACK LOADER 75-100 HP Jam
15 WHEEL LOADER 1.0-1.6 M3 Jam
16 THREE WHEEL ROLLER 6-8 T Jam
17 TANDEM ROLLER 6-8 T. Jam
18 TIRE ROLLER 8-10 T. Jam
19 VIBRATORY ROLLER 5-8 T. Jam
20 CONCRETE VIBRATOR Jam
21 ROAD MARKING MACHINE Jam
22 WATER PUMP 70-100 mm Jam
23 WATER TANKER 3000-4500 L. Jam
24 PEDESTRIAN ROLLER Jam
25 TAMPER Jam
26 JACK HAMMER Jam
27 FULVI MIXER Jam
28 CONCRETE PUMP Jam
29 TRAILER 20 TON Jam
30 PILE DRIVER + HAMMER Jam
31 CRANE ON TRACK 35 TON Jam
32 WELDING SET Jam
33 BORE PILE MACHINE Jam
34 ASPHALT LIQUID MIXER Jam
35 TRONTON Jam
36 COLD MILLING Jam
37 ROCK DRILL BREAKER Jam
Lokasi Pekerjaan 38 COLD RECYCLER Jam
Lokasi Pekerjaan 39 HOT RECYCLER Jam
40 AGGREGAT (CHIP) SPREADER Jam
41 ASPHALT DISTRIBUTOR Jam
42 SLIP FORM PAVER Jam
43 CONCRETE PAN MIXER Jam
44 CONCRETE BREAKER Jam
45 ASPAHLT TANKER Jam
46 CEMENT TANKER Jam
47 CONDRETE MIXER (350) Jam
48 VIBRATING RAMMER Jam
49 TRUK MIXER (AGITATOR) Jam
50 BORE PILE MACHINE Jam
51 CRANE ON TRACK 75-100 TON Jam
52 BLENDING EQUIPMENT Jam
Base Camp 53 ASPHALT LIQUID MIXER Jam
Base Camp
Base Camp
DAFTAR
UPAH PEKERJA
No. URAIAN SATUAN
Base Camp 1 Mandor Hari
Base Camp 2 Kepala tukang gali Hari
Base Camp 3 Tukang gali tanah Hari
Base Camp 4 Kepala tukang batu Hari
Base Camp 5 Tukang batu Hari
Lokasi Pekerjaan 6 Tukang batu setengah terampil Hari
Lokasi Pekerjaan 7 Kepala tukang kayu Hari
Lokasi Pekerjaan 8 Tukang kayu Hari
Lokasi Pekerjaan 9 Tukang kayu setengah terampil Hari
Lokasi Pekerjaan 10 Kepala tukang besi Hari
Lokasi Pekerjaan 11 Tukang besi terampil Hari
Lokasi Pekerjaan 12 Tukang besi setengah terampil Hari
Lokasi Pekerjaan 13 Kepala tukang cat Hari
Lokasi Pekerjaan 14 Tukang cat terampil Hari
Lokasi Pekerjaan 15 Tukang cat setengah terampil Hari
Lokasi Pekerjaan 16 Pekerja Hari
17 Operator Hari
18 Pembantu Operator Hari
19 Sopir / Driver Hari
20 Pembantu Sopir / Driver Hari
Base Camp 21 Mekanik Hari
Base Camp 22 Pembantu Mekanik Hari
Base Camp 23 Instalator Hari
24 Pembantu Instalator Hari
DAFTAR
GA SEWA ALAT
HARGA
No
SATUAN KETERANGAN
( Rp.) A
A.001
A.002
6,300,000.00 A.003
1,400,000.00 A.004
10,500,000.00 A.005
1,050,000.00 A.006
700,000.00 A.007
2,250,000.00 A.008
800,000.00 A.009
600,000.00 A.010
6,650,000.00 A.011
1,050,000.00 A.012
2,100,000.00 A.013
6,300,000.00
7,000,000.00
6,650,000.00
7,000,000.00
4,000,000.00
3,850,000.00
7,000,000.00
350,000.00 A.014
1,750,000.00
350,000.00
1,050,000.00
350,000.00
350,000.00
350,000.00
3,500,000.00
3,500,000.00 A.015
7,000,000.00
7,000,000.00
7,000,000.00
1,400,000.00
3,500,000.00
2,100,000.00

A.016
A.017
A.018
A.019
A.020
A.021
3,500,000.00 A.022
1,400,000.00
B
B.001
B.002
700,000.00 B.003
B.004
B.005
10,500,000.00 B.006
14,000,000.00 B.007
B.008
B.009
6,650,000.00 B.010
1,100,000.00 B.011
B.012
DAFTAR B.013
MOBILISASI ALAT

HARGA B.014
SATUAN KETERANGAN B.015
( Rp.) B.016
B.017
B.018
B.019
B.020
B.021
B.022
B.023
B.024
B.025
B.026
B.027
B.028
B.029
B.030
B.031
B.032
B.033
B.034
B.035
B.036
B.037
B.038
B.039
B.040
B.041
B.042
B.043
B.044
B.045
B.046
B.047
B.048
B.049
B.050
B.051
B.052
B.053

B.054

B.055
B.056

C
C.001
C.002
C.003
C.004
C.005
FTAR C.006
PEKERJA C.007
UPAH (Rp.) KETERANGAN C.008
85,000 7 jam C.009
60,000 7 jam C.010
65,000 7 jam C.011
75,000 7 jam C.012
65,000 7 jam
45,000 7 jam D
75,000 7 jam D.001
65,000 7 jam D.002
50,000 7 jam D.003
75,000 7 jam D.004
65,000 7 jam D.005
50,000 7 jam
75,000 7 jam
65,000 7 jam
50,000 7 jam
55,000 7 jam D.006
85,000 7 jam
65,000 7 jam
50,000 7 jam D.007
43,000 7 jam
54,000 7 jam
47,000 7 jam
75,000 7 jam
65,000 7 jam D.008
D.009
D.010
D.011
D.012

D.013

D.014
D.015

D.016
D.017
D.018
D.019
D.020
D.021
D.022
D.023
D.024
D.025
D.026

D.027
D.028
D.029
D.030
D.031
D.032

E
E1
E1.001
E1.002
E1.003
E1.004
E1.005
E1.006
E1.007
E1.008
E1.009
E1.010
E1.011
E1.012
E1.013
E1.014
E1.015
E1.016
E1.017
E1.018
E1.019
E1.020
E1.021
E1.022

E1.023
E1.024
E1.025
E1.026
E1.027
E1.028
E1.029
E1.030
E1.031
E1.032
E1.033
E1.034
E1.035
E1.036

E2
E2.001
E2.002
E2.003
E2.004
E2.005
E2.006
E2.007
E2.008

F
F.001
F.002
F.003
F.004
F.005
F.006
F.007
F.008

G
G.001

G.002

G.003
G.004
G.005
G.006
G.007
G.008
G.009
G.010
G.011

G.012
H
H.001
H.002
H.003
H.004
H.005

H.006
H.007
H.008
H.009
H.010
H.011
H.012
H.013
H.014
H.015
H.016
H.017
H.018
H.019
H.020
H.021
H.022
H.023
H.024
H.025
H.026
H.027
H.028
H.029
H.030
H.031
H.032
H.033
H.034
H.035
H.036
H.037
H.038
H.039
H.040
H.041
H.042
H.043
I.1
I.1.001
I.1.002
I.1.003
I.1.004
I.1.005
I.1.006
I.1.007
I.1.008
I.1.009
I.1.010
I.1.011
I.1.012
I.1.013
I.1.014
I.1.015
I.1.016
I.2
I.2.001
I.2.002
I.2.003

I.3
I.3.001
I.3.002
I.3.003
I.3.004
I.3.005
I.3.006
I.3.007
I.3.008
I.3.009
I.3.010
I.3.011
I.3.012
I.3.013
I.3.014
I.3.015
I.3.016

I.4
I.4.001

I.5
I.5.001
I.5.002
I.5.003
I.5.004
I.5.005
I.5.006
I.5.007
I.5.008
I.5.009
I.5.010
I.5.011
I.5.012
I.5.013
I.5.014
I.5.015
I.5.016
I.5.017

J
J.001
J.002
J.003
J.004
J.005
J.006
J.007
J.008
J.009
J.010
J.011
J.012
J.013
J.014
J.015
J.016
J.017
J.020
J.021
J.022
J.023
J.024
J.025
J.027
J.028
J.029

K
K.001
K.002
K.003
K.004
K.005
K.006
K.007
K.008
K.009
K.010
K.011
K.012
K.013
K.014
K.015
K.016

L
L.001
L.002
L.003
L.004
L.005
M
M.001
M.002
M.003
M.004
M.005
M.006
N
N.001

N.002

O
O.001
O.002
O.003
O.004
O.005
O.006
O.007
O.008
O.009
O.010
O.011

P
P.001
P.002
P.003
P.004
P.005
P.006
P.007
P.008
P.009
P.010
P.011
P.012
P.013
P.014
P.015
P.016
P.017
P.018
P.019
P.020
P.021
P.022
P.023
P.024
P.025
P.026
P.027
P.028
P.029
P.030
P.031
P.034
P.035
P.036
P.037
P.038
P.039
P.040
P.041
P.042
P.043
P.044
P.045
P.046
P.047
P.048
P.049
P.050
P.051
P.052
P.053
P.054
P.055
P.056
P.057
P.058
P.059
P.060
P.061
P.062
P.063
P.064
P.065
P.066
P.067

Q
Q.001
Q.002
Q.003
Q.004
Q.005
Q.006
Q.007
Q.008
Q.009
Q.010
Q.011
Q.012
Q.013
Q.014
Q.015

Q.019
Q.020

Q.021

Q.022
Q.023
Q.024
Q.025
Q.026
Q.027

Q.028

Q.029
Q.030
Q.031

Q.032
Q.033
Q.034

R
R.001

R.002

R.003

R.004

R.005
R.006
R.007
S
T
U
U.001
U.002
U.003
U.004
U.005
U.006
U.007
U.008
U.009
U.010
U.011
U.012
U.013
U.014
U.015
U.016
U.017
U.018
U.019
U.020
U.021
U.022
U.023
U.024
U.025
U.026
U.027
U.028
U.029
U.030
U.031
U.032
U.033
U.034
U.035
U.036
U.037
U.038
U.039
U.040
U.041
U.042
U.043
U.044
U.045
U.046
U.047
U.048
U.049
U.050
U.051
U.052
U.053
U.054
U.055
U.056
U.057
U.058
U.059
U.060
U.061
U.062
U.063
U.064
U.065
U.066
U.067
U.068
U.069
U.070
U.071
U.072
U.073
U.074
U.075
U.076
U.077
U.078
U.079
U.080
U.081
U.082
U.083
U.084
U.085
U.086
U.087
U.088
U.089
U.090
U.091
U.092
U.093
U.094
U.095
U.096
U.097
U.098
U.099
U.100
U.101
U.102
U.103
U.104
U.105
U.106
U.107

V
Harga
Nama Barang
Satuan
PASIR DAN BATU
Pasir urug darat 135,000.00
Pasir pasang 185,000.00
Pasir Beton 177,000.00
Koral Beton 210,600.00
Batu Pecah/Split ukr. 1 - 2 cm 177,400.00
Batu Pecah/Split ukr. 2 - 3 cm 174,300.00
Batu Pecah/Split ukr. 3 - 4 cm 167,200.00
Batu Belah Pondasi 134,100.00
Abu Batu/Screening 5 mm 146,800.00
Macadam/Steel Slag ukr. 5 - 7 cm 130,000.00
Sirtu 162,000.00
Batu Tempel Hitam 135,000.00
Batu Palimanan
uk. 10 x 20 53,000.00
uk. 15 x 15 52,900.00
uk. 20 x 20 64,500.00
uk. 15 x 30 69,100.00
uk. 20 x 30 61,600.00
uk. 20 x 40 69,100.00
uk. 30 x 30 66,400.00
Batu Andesit
uk. 10 x 20 102,700.00
uk. 15 x 15 102,700.00
uk. 20 x 20 132,600.00
uk. 15 x 30 126,000.00
uk. 20 x 30 134,200.00
uk. 20 x 40 148,300.00
uk. 30 x 30 146,400.00
Batu Candi
uk. 10 x 20 80,000.00
uk. 15 x 15 79,400.00
uk. 20 x 20 83,600.00
uk. 15 x 30 80,500.00
uk. 20 x 30 80,800.00
uk. 20 x 40 86,300.00
uk. 30 x 30 86,800.00
Batu sikat 20 kg 75,300.00
Batu sikat 25kg 90,000.00
Batu sikat Alor 50 kg 251,700.00
Tanah Merah 54,400.00
Tanah untuk media tanam 73,800.00
Lapisan permukaan batu tulung agung 335,500.00
Karung 2,800.00

1. PAVING BLOK
Interblok. Blok Abu-abu type 4,6 ukr 6 x 10,5 x 21 41,000.00
Int. Blok Merah/Hitam type 4,6 ukr. 6 x 10,5 x 21 52,000.00
Int. Blok Abu-abu type 16,6 ukr 6 x 11,5 x 22,5 55,000.00
Kastin Abu-abu ukr. 10.20.40 K 300 37,400.00
Kastin Abu-abu ukr. 10.20.40 K 175 30,800.00
Paving Block K 350 Tebal 6 Abu-abu 48,600.00
Paving Block K 350 Tebal 8 Abu-abu 57,900.00
Topi uskup K.350 tebal 6 69,700.00
Topi uskup K.350 tebal 8 100,300.00
Paving Block K 250 Tebal 6 Abu-abu 43,100.00
Paving Block K 250 Tebal 8 Abu-abu 52,600.00
Topi uskup K 250 Tebal 6 63,000.00
Topi uskup K 250 Tebal 8 81,900.00

Paving Block Expose


Paving Block Tinggi 6 Type Conbloc 4 - Abu abu 81,200.00
Paving Block Tinggi 8 Type Conbloc 4 - Abu abu 94,200.00
Paving Block Tinggi 10 Type Conbloc 4 - Abu abu 115,800.00
Paving Block Tinggi 6 Type Conbloc 16 - Abu abu 89,800.00
Paving Block Tinggi 8 Type Conbloc 16 - Abu abu 113,700.00
Halfbloc 6/ Veta B - Abu abu 7,000.00
Halfbloc 8/ Veta B- Abu abu 7,900.00
Paving Block Tinggi 8 Type Dikformat - Abu abu 37,000.00
Paving Block Tinggi 8 Type Munich - Abu abu 82,000.00
Paving Block Tinggi 6 Type Roma - Abu abu 104,700.00
Paving Block Tinggi 8 Type Roma - Abu abu 114,800.00
Paving Block Tinggi 6 Type Zurich - Abu abu 81,000.00
Paving Block Tinggi 8 Type Zurich - Abu abu 95,000.00
Paving Block Tinggi 6 Type Milan/Lito - Abu abu 72,000.00
Paving Block Type Grassbloc 20.10.40 - Abu abu 83,300.00
Paving Block Tinggi 8 Type Segmento - Abu abu 96,000.00
Paving Block Tinggi 8 Type Classico. C - Abu abu 98,300.00
Paving Block Tinggi 8 Type Classico. D - Abu abu 90,500.00
Kansteen Pilar 15.20.50 55,500.00
Kansteen Pilar 15.25.40 56,000.00
Kst Mulut Air 15.25.40/CTU 65,000.00
Kst Tikung 15.25.40 R 1.5 69,900.00
Kst Tikung 15.25.40 R 3.0 72,100.00
Kst 15.30.40 DKI 77,300.00
Kst Mulut Air 15.30.40/CTU 75,700.00
Kst Tikung 15.30.40 R 1.5 78,600.00
Kst Tikung 15.30.40 R 3.0 85,400.00
Kst Kapuk 19.20.40 55,500.00
Kst BCD 98,100.00
Tali Air A 40,500.00
Tali Air AR 1.5/CR 1.5 70,800.00
Tali Air AR 3.0/CR 3.0 71,500.00
Tali Air B 40,600.00
TA Kotak C 13,800.00
TA Kotak D 148,000.00
TA Kotak E 132,000.00
Constone 152,700.00
Sandstone Abu 105,800.00
Sandstone colour 151,000.00
Conpave : t = 8 cm
31.5 x 31.5 x 8 cm 162,300.00
21 x 21 x 8 cm 162,800.00
Vienna 8/ Veta B
21 x 10.5 x 8 cm 162,800.00
10.5 x 10.5 x 8 cm 162,800.00
Conpave : t = 6 cm
21 x 21 x 6 cm 104,800.00
Vienna 6/ Veta B
21 x 10.5 x 6 cm 107,300.00
10.5 x 10.5 x 6 cm 105,800.00
Conpave 6 Hijau 110,000.00
Conpave 8 Hijau 125,000.00

SEMEN / KAPUR
Semen Cibinong (Kujang) 50 kg 53,500.00
Semen Tiga Roda 50 kg 55,000.00
Semen Gresik 50 kg 53,500.00
Semen Holcim 50 kg 54,000.00
Semen Putih Tiga Roda 40 kg 73,000.00
Semen Warna 5,700.00
Bata merah 350.00
Bataco (bhn Semen + Pasir + Abu Batu) 1,700.00
Rooster Beton 20 x 20 x 7 cm 3,100.00
Rooster Bata Merah 12 x 24 x 11,5 cm 5,600.00
Tali-tali airpracetak 40 x 30 x 100 Cm 173,300.00
Batako Putih / Hebel 5,500.00

KAYU
Papan Kayu Kamper Kruing/ Medan/Banjar ukuran 3 x 20 / 30 x 400 3,500,000.00
Papan Kayu Kamper Singkil 3 x 20 / 30 x 400 4,750,500.00
Papan Kayu Meranti ukuran :2/3 x 20/30 x 400 2,450,000.00
Papan Kayu Terentang ukuran 2 x 20/30 x400 2,426,760.00
Papan Kayu Kamper Samarinda Oven :
4 x 30 x 400 5,939,600.00
3 x 30 x 400 5,938,300.00
4 x 25 x 400 5,786,200.00
3 x 20 x 400 5,741,700.00
Papan Kayu Kamper Singkil Oven :
4 x 30 x 400 5,250,300.00
3 x 30 x 400 5,275,200.00
Balok Kayu Kamper Singkil ukuran :
5/10 x 400 4,052,500.00
6/12 x 400 4,076,300.00
8/12 x 400 4,143,300.00
8/15 x 400 4,143,300.00
Balok Kayu Kamper Kruing/ Medan / Banjar ukuran 6/8 x 12/15 x 400 3,650,000.00
Balok Kayu Meranti Jambi/palembang ukuran 6/8 x 12/15 x 400 2,453,200.00
Balok Kayu Kamper samarinda ukuran 6/8, 12/15 x 400 4,900,000.00
Balok kayu jati 21,421,000.00
Balok Kayu Kamper Samarinda Oven :
6 x 12 x 400 5,714,000.00
8 x 12 x 400 5,714,000.00
6 x 15 x 400 5,741,000.00
8 x 15 x 400 5,741,000.00
Balok Kayu Kamper Singkil :
5 x 10 x 400 4,052,500.00
6 x 12 x 400 4,076,300.00
8 x 12 x 400 4,143,300.00
8 x 15 x 400 4,143,300.00
Kaso kayu Meranti Jambi/Palembang ukr. 4 x 6 , 5 x 7 x 400 2,283,300.00
Kaso Kayu Kamper Samarinda :
Ukuran : 4 x 6 x 400 5,326,300.00
Ukuran : 5 x 7 x 400 5,326,300.00
Ukuran : 6/12 x 400 4,737,500.00
Kaso Kayu Kamper Singkil :
4/6 x 400 4,039,400.00
5/7 x 400 4,039,400.00
Dolken Ø 5 - 7 cm ukr. 300 - 400 cm 15,500.00
Dolken Ø 8 - 10 cm ukr. 350 - 400 cm 17,850.00
List profil kamper 5 Cm 13,300.00
List Profil Kamper 2 cm 7,600.00
List Gypsum 7 cm 19,200.00
List Gypsum 10 cm 25,300.00
List Gypsum 12 cm 31,800.00
List Plin ukr : 8.5 x 1.4 cm 55,800.00
List Plin ukr : 10 x 2 cm 60,000.00
Kayu Bakar 37,800.00
Balok :
Meranti (6×12) 80,000.00
Meranti (8×12) 125,000.00
Borneo (6×12) 80,000.00
Borneo (8×12) 100,000.00
Kamper (6×12) 185,000.00
Kamper (8×12) 210,000.00

BETON
BUIS BETON
Buis Beton Ukuran .Ø 100 cm tanpa tulangan panjang 1,00 m K 400 546,500.00
Buis Beton Ukuran .Ø 100 cm tanpa tulangan panjang 1,00 m Lokal 358,500.00
Buis Beton Ukuran .Ø 80 cm tanpa tulangan panjang 1,00 m K 400 313,600.00
Buis Beton Ukuran .Ø 80 cm tanpa tulangan panjang 1,00 m Lokal 216,300.00
Buis Beton Ukuran .Ø 60 cm tanpa tulangan panjang 1,00 m K 400 272,500.00
Buis Beton Ukuran .Ø 60 cm tanpa tulangan panjang 1,00 m Lokal 146,100.00
Buis Beton Ukuran .Ø 50 cm tanpa tulangan panjang 1,00 m Lokal 112,200.00
Buis Beton Ukuran .Ø 40 cm tanpa tulangan panjang 1,00 m Lokal 84,800.00
Buis Beton Ukuran .Ø 30 cm tanpa tulangan panjang 1,00 m lokal 65,300.00
Buis Beton Ukuran .Ø 20 cm tanpa tulangan panjang 1,00 m Lokal 48,000.00
Buis beton bertulang panjang 1,25 m .uk. Ø 30 cm
Buis beton bertulang panjang 1,25 m .uk. Ø 40 cm
Buis beton bertulang panjang 1,25 m .uk. Ø 50 cm
Buis beton bertulang panjang 1,25 m .uk. Ø 60 cm
Buis beton bertulang panjang 2,50 m .uk. Ø 60 cm 498,400.00
Buis beton bertulang panjang 2,50 m .uk. Ø 70 cm 630,600.00
Buis beton bertulang panjang 2,50 m .uk. Ø 80 cm 779,200.00
Buis beton bertulang panjang 2,50 m .uk. Ø 90 cm 950,700.00
Buis beton bertulang panjang 2,50 m .uk. Ø 100 cm 1,129,000.00
Buis beton bertulang panjang 2,50 m .uk. Ø 110 cm 1,418,000.00
Buis beton bertulang panjang 2,50 m .uk. Ø 120 cm 1,795,000.00
Buis beton bertulang panjang 2,50 m .uk. Ø 130 cm 2,045,000.00
Buis beton bertulang panjang 2,50 m .uk. Ø 140 cm 2,265,000.00
Buis beton bertulang panjang 2,50 m .uk. Ø 150 cm 2,499,000.00
Box culvert ukuran 400x400 C & B
Box culvert ukuran 500x500 C & B
Box culvert ukuran 600x600 BC
Box culvert ukuran 800x800 BC
Box culvert ukuran 1000x1000 BC
Box culvert ukuran 1200x1200 C & B
Buis Beton Ukuran .1/2 Ø 100 cm tanpa tulangan panjang 1,00 m lokal 132,000.00
Buis Beton Ukuran .1/2 Ø 80 cm tanpa tulangan panjang 1,00 m lokal 121,300.00
Buis Beton Ukuran .1/2 Ø 60 cm tanpa tulangan panjang 1,00 m lokal 71,000.00
Buis Beton Ukuran .1/2 Ø 50 cm tanpa tulangan panjang 1,00 m lokal 67,300.00
Buis Beton Ukuran .1/2 Ø 40 cm tanpa tulangan panjang 1,00 m lokal 62,500.00
Buis Beton Ukuran .1/2 Ø 30 cm tanpa tulangan panjang 1,00 m lokal 42,500.00
Buis Beton Ukuran .1/2 Ø 20 cm tanpa tulangan panjang 1,00 m lokal 29,500.00

READYMIX
Readymix beton K-125 tanpa pompa 426,800.00
Readymix beton K-175 tanpa pompa 561,000.00
Readymix beton K-225 tanpa pompa 463,300.00
Readymix beton K-250 tanpa pompa 489,700.00
Readymix beton K-300 tanpa pompa 509,900.00
Readymix beton K-350 tanpa pompa 515,800.00
Readymix beton K-400 tanpa pompa 581,700.00
Pekerjaan sparator modifikasi pot span 1 m

Saluran Terbuka ( U-DITCH)


40x40x120 cm
50x50x120 cm
60x60x120 cm
60x70x120 cm
80x80x120 cm
100x100x120 cm
100x120x120 cm
120x120x120 cm

JEMBATAN
Gerder POSTENSION WK termasuk STESSING
- L=35.80 m, H=160 cm
- Diafragma tengah
- Diafragma tepi
- RC Slab/Plat deck
Tiang Pancang WIKA (bulat) diameter 400 P : 12 m
- Bottom
- Midle
-Shet File
Test tiang pancang PDA
Pemancangan
Expantion joint Type Ruber 3
Elastomesik 500 x 400 x 50
Pipa sandaran diameter 3 "
Tiang Sandaran Galvanis
Railing Jembatan Antik
Tiang Pancang Bulat Diameter 500
Jembatan khusus pejalan kaki + aksesoris :
- Bangunan atas pipa baja tirus
- Bangunan bawah sumuran
Voided Slab (Masuk Jembatan) :
- VS 970/570 Bentang (L) 10,80 m, mutu beton K600
- VS 970/570 Bentang (L) 11,80 m, mutu beton K600
- VS 970/570 Bentang (L) 12,80 m, mutu beton K600
- VS 970/620 Bentang (L) 12,80 m, mutu beton K600
- VS 970/620 Bentang (L) 13,80 m, mutu beton K600
- VS 970/620 Bentang (L) 14,80 m, mutu beton K800
- VS 970/620 Bentang (L) 15,80 m, mutu beton K600
- VS 970/620 Bentang (L) 16,80 m, mutu beton K800
- VS 970/620 Bentang (L) 17,80 m, mutu beton K800

Nestable Flange E - 100


Diameter 450 mm, Tebal 2,0 mm
Diameter 600 mm, Tebal 2,0 mm
Diameter 800 mm, Tebal 2,0 mm
Diameter 1000 mm, Tebal 2,0 mm
Diameter 1000 mm, Tebal 2,5 mm
Diameter 1200 mm, Tebal 2,0 mm
Diameter 1200 mm, Tebal 2,5 mm
Diameter 1200 mm, Tebal 3,5 mm
Diameter 1400 mm, Tebal 2,0 mm
Diameter 1400 mm, Tebal 2,5 mm
Diameter 1400 mm, Tebal 3,5 mm
Diameter 1500 mm, Tebal 2,0 mm
Diameter 1500 mm, Tebal 2,5 mm
Diameter 1500 mm, Tebal 3,5 mm
Diameter 1600 mm, Tebal 2,0 mm
Diameter 1600 mm, Tebal 2,5 mm
Diameter 1600 mm, Tebal 3,5 mm
Diameter 1800 mm, Tebal 2,0 mm
Diameter 1800 mm, Tebal 2,5 mm
Diameter 1800 mm, Tebal 3,5 mm
Multi Plate Pipe
Diameter 1500 mm :
a. Tebal 3.0 mm
b. Tebal 4.5 mm
c. Tebal 5.0 mm
d. Tebal 6.0 mm
e. Tebal 7.0 mm
Diameter 1800 mm :
a. Tebal 3.0 mm
b. Tebal 4.5 mm
c. Tebal 5.0 mm
d. Tebal 6.0 mm
e. Tebal 7.0 mm
Diameter 2100 mm :
a. Tebal 3.0 mm
b. Tebal 4.5 mm
c. Tebal 5.0 mm
d. Tebal 6.0 mm
e. Tebal 7.0 mm
Diameter 2250 mm :
a. Tebal 3.0 mm
b. Tebal 4.5 mm
c. Tebal 5.0 mm
d. Tebal 6.0 mm
e. Tebal 7.0 mm
Diameter 2400 mm :
a. Tebal 3.0 mm
b. Tebal 4.5 mm
c. Tebal 5.0 mm
d. Tebal 6.0 mm
e. Tebal 7.0 mm
Diameter 2700 mm :
a. Tebal 3.0 mm
b. Tebal 4.5 mm
c. Tebal 5.0 mm
d. Tebal 6.0 mm
e. Tebal 7.0 mm
Diameter 3000 mm :
a. Tebal 3.0 mm
b. Tebal 4.5 mm
c. Tebal 5.0 mm
d. Tebal 6.0 mm
e. Tebal 7.0 mm
Diameter 3150 mm :
a. Tebal 3.0 mm
b. Tebal 4.5 mm
c. Tebal 5.0 mm
d. Tebal 6.0 mm
e. Tebal 7.0 mm
Diameter 3300 mm :
a. Tebal 3.0 mm
b. Tebal 4.5 mm
c. Tebal 5.0 mm
d. Tebal 6.0 mm
e. Tebal 7.0 mm
Diameter 3600 mm :
a. Tebal 3.0 mm
b. Tebal 4.5 mm
c. Tebal 5.0 mm
d. Tebal 6.0 mm
e. Tebal 7.0 mm
Multi Plate Pipe Arches
Ukuran 1850 mm, 1550 mm :
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Ukuran 2280 mm, 1730 mm :
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Ukuran 2540 mm, 1880 mm :
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Multi Plate Arches
Ukuran Span 2000 mm, Rise 890 mm :
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Ukuran Span 2500 mm, Rise 1100 mm :
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Ukuran Span 3000 mm, Rise 1310 mm :
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Multi Plate Underpasses
Ukuran Span 3220 mm, Rise 2780 mm :
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Ukuran Span 3690 mm, Rise 3060 mm :
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Ukuran Span 3830 mm, Rise 3180 mm :
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Guard Rail - Compponent
Beam panjang 4330 mm, tebal 2.7 mm, berat/batang 46 kg
Post panjang 1800 mm, tebal 6 mm, berat/batang 26 kg
Post panjang 1800 mm, tebal 4.5 mm, berat/batang 20 kg
B. Piece panjang 350 mm, tebal 6 mm, berat/batang 05 kg
B. Piece panjang 350 mm, tebal 4.5 mm, berat/batang 04 kg
T. End panjang 725 mm, tebal 2.7 mm, berat/batang 8 kg
Running Meter berat/batang 27 kg
Running Meter berat/batang 23.25 kg
Typical Horizontal Ellipse
Struktur 12 E 6, bentang 3.17 m, tinggi 2.18 m
Struktur 15 E 6, bentang 3.82 m, tinggi 2.42 m
Struktur 18 E 8, bentang 4.66 m, tinggi 3.07 m
Struktur 20 E 8 bentang 5.10 m, tinggi 3.22 m
Struktur 22 E 11, bentang 5.82 m, tinggi 4.00 m
Struktur 24 E 12 bentang 6.25 m, tinggi 4.16 m
Struktur 26 E 12, bentang 6.78 m, tinggi 4.52 m
Struktur 28 E 12, bentang 7.21 m, tinggi 4.68 m
Struktur 30 E 15, bentang 7.93 m, tinggi 5.45 m
Struktur 32 E 15, bentang 8.36 m, tinggi 5.61 m
Multi Plate Superspan High Profile Arch Shapes
Struktur 24 A 6 - 5
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Struktur 25 A 6 - 6
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Struktur 26 A 6 - 6
Tebal 3.0 mm
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Struktur 45 A 10 - 15 tebal 7.0 mm
Multi Plate Superspan Low Profile Arch Shapes
Struktur 27 A 8
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Struktur 28 A 8
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Struktur 29 A 8
Tebal 4.5 mm
Tebal 5.0 mm
Tebal 6.0 mm
Tebal 7.0 mm
Struktur 45 A 12

CAT
Cat Kayu setara Glotek 29,650.00
Cat Kayu setara F Talit 31,500.00
Cat Besi setara Glotek 29,650.00
Cat Besi setara F Talit 31,500.00
Cat tembok setara Jotun ( Interior ) 25,000.00
Cat tembok setara Jotun ( Exterior ) 37,000.00
Cat tembok setara Vinilex 12,000.00
Cat tembok setara Metrolite 10,500.00
Cat tembok setara Dulux / ICI ( Exterior ) 46,000.00
Cat tembok setara Dulux / ICI ( Interior ) 28,000.00
Cat dasar setara Dulux 30,000.00
Cat Dasar 5 kg 88,250.00
Cat kayu setara seiv 26,100.00
Cat besi setara seiv 28,500.00
Rool cat tembok 25,700.00
Kwas 3" 14,200.00
Oker 8,600.00
Spirtus 7,000.00
Bahan pelitur Kripik ( sirlak india) 59,500.00
Dempul plitur 26,200.00
Dempul halus/Infra 25,700.00
Terpentin 5,000.00
Thiner A 15,300.00
Thiner B 16,000.00
Melamik 33,800.00
Ampelas Besi 15,000.00
Plamur Tembok setara Matek/Metrolite 11,500.00
Plamur Kayu/Dempul Kayu 19,000.00
Pelamir Tembok 8,700.00
Residu 7,800.00
Meni Kayu setara Nippon 15,700.00
Meni Besi setara Nippon 15,250.00
Pelitur 34,500.00
Minyak Cat/Tinner 15,000.00
Vernis Bee Brand 66 (kayu/besi) 29,700.00
Amplas Kayu 4,500.00
Soda Api 23,900.00
Sapu Lidi 5,650.00
Minyak Tanah 3,000.00
Minyak Tanah Industri 3,500.00
Ijuk 6,250.00
Pelumas 21,800.00
Minyak Solar 6,000.00
Lem Putih 15,000.00
LANTAI
Ubin Keramik Ukr. 10x20 Standar KW 2 34,700.00
Ubin Keramik Ukr. 10x20 Standar KW 1 37,000.00
Ubin Keramik Ukr. 20x20 Standar KW 2 32,200.00
Ubin Keramik Ukr. 20x20 Standar KW 1 41,500.00
Ubin Keramik Ukr. 20x25 Standar KW1 41,800.00
Ubin Keramik Ukr. 20x25 Standar KW2 35,200.00
Ubin Keramik Ukr. 30x30 Standar KW 2 40,000.00
Ubin Keramik Ukr. 30x30 Standar KW 1 43,700.00
Ubin Keramik Ukr. 40x40 Standar KW 2 45,700.00
Ubin Keramik Ukr. 40x40 Standar KW 1 51,300.00
Ubin Keramik 10x20 dan 20x20 KW1DN Standar 39,800.00
Ubin Keramik 10 x 25 Standar KW 2 37,300.00
Ubin Keramik 20 x 25 Standar KW 1 37,000.00
Ubin Keramik 30x30 KW1 DN warna/corak/anti slip 42,900.00
Plint Keramik Standart 10 x 20 cm 7,000.00
Border Keramik Dinding 7 x 20 37,500.00
TERAKOTA (Lantai Garasi / Teras)
Lantai Parkit Standar 104,900.00
Lantai Parkit Ukr 8 x 25 cm merk KIA 11,500.00
Lantai Parkit Ukr 7 x 20 cm merk Cina 23,800.00

MARMER
Ubin Marmer Bandung 90x60x2 cm
Ubin Marmer Bandung 60x60x2 cm
Ubin Marmer Bandung 60x40x2 cm
Ubin Marmer Bandung 60x30x2 cm
Ubin Marmer Bandung 40x40x2 cm
Ubin Marmer Bandung 40x30x2 cm
Ubin Marmer Bandung 30x30x2 cm
Ubin Marmer Bandung 30x10x1 cm
Ubin Marmer Lampung Cristaline 90x60x2 cm
Ubin Marmer Lampung Cristaline 60x60x2 cm
Ubin Marmer Lampung Cristaline 60x40x2 cm
Ubin Marmer Lampung Cristaline 60x30x2 cm
Ubin Marmer Lampung Cristaline 40x40x2 cm
Ubin Marmer Lampung Cristaline 10x60x2 cm
Ubin Marmer Lampung Cristaline 10x40x2 cm
Ubin Marmer Lampung Cristaline 10x30x2 cm

GRANIT
Granito Mirogranit

UBIN MERK MASTERINA


Ubin Masterina Uk. 10 x 20 seri MIP
Ubin Masterina Uk. 10 x 20 seri MID
Ubin Masterina Uk. 10 x 20 seri MIE
Ubin Masterina Uk. 20 x 20 seri M2P
Ubin Masterina Uk. 20 x 20 seri M2S
Ubin Masterina Uk. 20 x 20 seri M2D
Ubin Masterina Uk. 20 x 20 seri M2E
Ubin Masterina Uk. 30 x 30 seri M3P
Ubin Masterina Uk. 30 x 30 seri M3S
Ubin Masterina Uk. 30 x 30 seri M3D
Ubin Masterina Uk. 40 x 40 seri M4P
Ubin Masterina Uk. 40 x 40 seri M4S
Ubin Masterina Uk. 40 x 40 seri M4D
Ubin Masterina Uk. 40 x 40 seri M4DS
Lantai Parkir jati Ukr. 30x5x1,8 Cm *
Lantai Parkir jati Ukr. 30x5x1 Cm *
Porselin Putih/warna Ukr. 11x11 (KIA)

KAYU LAPIS / FORMIKA / SOFBOARD


Teak Wood ukr. 92 x 210 x 3 mm 66,500.00
Teak Wood ukr. 122 x 244 x 3 mm 74,300.00
Teakwood ukr. 122 x 244 x 4 mm 77,700.00
Teakwood ukr. 90 x 210 x 4 mm 74,000.00
Formika ukr. 90 x 210 x 3 mm 72,500.00
Formika ukr. 122 x 244 x 3 mm 74,300.00
Bahan plafond hardplex 5 mm 120x240 46,400.00
Bahan plafond asbes semen 5 mm 13,900.00
Gypsum 9 mm 120 x 240 ex. DN 42,800.00
Gypsum 12 mm 120 x 240 ex. DN 57,800.00
Triplek ukr. 122 x 244 x 3 mm 37,000.00
Triplek ukr. 122 x 244 x 4 mm 47,000.00
Triplek ukr. 122 x 244 x 6 mm 140,000.00
Multiplek ukr. 122 x 244 x 9 mm 97,800.00
Multiplek ukr. 122 x 244 x 12 mm 126,200.00
Multiplek ukr. 122 x 244 x 15 mm 164,600.00
Multiplek ukr. 122 x 244 x 18 mm 181,400.00
Block teak 122 x 244 tebal 18 mm 1 muka 56,800.00
Block teak 122t x 244 tebal 18 mm 2 muka 73,300.00
Melamin 122 x 244 x 3 mm 65,000.00
Melamin ukr. 90 x 210 x 3 mm 55,000.00
Step Nose 10 x 30 19,000.00
Step Nose 10 x 20 16,000.00
Daun Pintu Kayu Kamper Samarinda (Bukan Oven) 384,000.00
Daun Pintu Kayu Kamper Samarinda Kualitas Export (Oven) 900,000.00
Kusen dan Daun Pintu PVC ukuran standar 152,700.00

ALAT PENGUNCI
Engsel Pintu Nilon ukuran 3" 17,300.00
Engsel Pintu Nilon ukuran 4" 21,000.00
Engsel Stainless Stell setara YANK 3" 16,800.00
Engsel Stainless Stell setara YANK 4" 23,800.00
Engsel Piano (RRC) 23,100.00
Grendel setara Dekon/Poloma ukuran 3" 13,000.00
Grendel setara Dekon/Poloma ukuran 4" 16,500.00
Kunci Double Sloog setara Poloma 150,000.00
Engsel Stainless Steel setara Solid uk. 3" 26,000.00
Engsel Stainless Steel setara Solid uk. 4" 50,000.00
Engsel Stainless stell setara Dekon/Poloma uk. 3" 29,600.00
Engsel Stainless stell setara Dekon/Poloma uk. 4" 43,000.00
Grendel setara Solid ukuran 3" 17,000.00
Grendel setara Solid ukuran 4" 27,000.00
Kunci Double Sloog Solid 214,000.00
Gembok 60mm merk AXEL 58,200.00
Kunci tanam lengkap ( handle + kunci ) 150,000.00
Engsel pintu 35,000.00
Engsel jendela 25,000.00
Grendel tanam pintu doble 125,000.00
Hak angin 35,000.00
Grendel jendela 35,000.00

CLOSET DUDUK
Closet Duduk CW 660 J/ SW 660 J Rough - in : 230 m 2,187,700.00
Closet Duduk CW 420 J/ SW 516 JPTA Rough - in : 500 m 2,184,700.00
Closet Duduk Asi Dublo Scala 6 liter 611,700.00
Closet Duduk TOTO 6 liter 1,315,000.00
Closet Duduk INA 6 liter 952,000.00
CLOSET JONGKOK
Colset Jongkok Merk Toto Tipe Standar 232,700.00
Type C-1 Warna Standar ( Merk INA) 269,700.00
Type C-1 Warna Maroon (Merk INA) 251,000.00
Type C-14 Warna Standar (merk INA) Type C14/17 287,800.00
Type C-14/17 Warna Maroon (Merk INA) 388,000.00
Type C-16 Warna Standar (Merk INA) 302,500.00
BAK
Bak mandi Alco Piber :
a. Ukuran 65 x 65 cm 191,700.00
b. Ukuran 56 x 56 cm 127,200.00
Bak Penampung Air / Tower Tanx Merk Excel Cap. 700 ltr
Kapasitas 700 ltr 915,000.00
Kapasitas 500 ltr 768,100.00
Kapasitas 1000 ltr 1,370,000.00
KACA (Ex. ASAHI MAS)
Kaca bening 2 mm 57,250.00
Kaca bening 3 mm 43,000.00
Kaca bening 5 mm 92,600.00
Kaca bening 8 mm 132,000.00
Kaca bening 10 mm 173,300.00
Kaca Es 3 mm 74,250.00
Kaca Es 5 mm 101,550.00
Kaca Rayben 5 mm 100,600.00
Kaca Rayben 8 mm 212,500.00
Kaca Rayben 10 mm 292,000.00
Kaca Rayben 12 mm 357,100.00

ATAP
Genteng Kodok, Plentong Natural 1,400.00
Bubungan Genteng Kodok Plentong Natural 3,000.00
Genteng plentong ex. Jatiwangi 900.00
Bubungan Genteng ex. Jatiwangi 3,100.00
Genteng beton warna 3,800.00
Bubungan Genteng Beton 5,700.00
Genteng Morando 1,800.00
Genteng Beton Polos 3,000.00
Bubungan Genteng Marundo 3,500.00
Bubungan Genteng Marundo Glasur 5,000.00
Bubungan Glasur Pelita 5,100.00
Genteng List plang Marundo Glasur setara Pelita 5,900.00

Genteng Morando Glasur 1,700.00


Genteng Glasur setara Pelita 2,100.00
Genteng Kanmuri Espanila Natural 4,800.00
Bubungan Genteng Kanmuri 27,000.00
Seng gelombang 180 x 90 x 0,20 30,300.00
Plat seng tebal 0,030 cm lebar 0,90 42,500.00
Plat seng tebal 0,020 cm lebar 0,90 27,500.00
Pintu Baja Standar Lengkap Engsel + Cat Dasar 716,400.00
Alumunium Foil 1 muka, medium weight (HF 404) 12,500.00
Kusen Alumunium Warna Ukuran 4" x 1 3/4" 107,400.00
Kusen Alumunium Natural Ukuran 4" x 1 3/4" 94,300.00
Kusen Alumunium setara type SF 70 R coulor ex YKK 104,300.00
Lover Alumunium setara type K 254 ex YKK 348,700.00
Kusen Alumunium Natural Ukuran 3" x 1 1/2" 86,300.00
Kusen Baja Pintu, Jendela, Standar Lengkap Engsel + Cat Dasar 98,100.00
Kusen Baja Pintu, Jendela, Jalusi, Standar Lengkap Engsel + Cat Dasar 111,600.00
Frame Pintu / Jendela Warna 94,400.00
Frame Pintu / Jendela Natural 96,200.00
Plint Alumunium T.10 cm Warna 17,900.00
Plint Alumunium T.10 cm Natural 17,000.00
Rangka Hollow 40 x 40 x 4 cm 16,300.00
Karet List 2,300.00
Sealent 15,000.00
Wall Paper Kualitas Standar 19,100.00
Wall Paper Kualitas Sedang 27,500.00
Pas. Pintu P.V.C. ex. Moradon Typ 105 E Polos lengkap kunci + Engsel 365,300.00
Pas. Pintu P.V.C. ex. Moradon Typ 104 D Polos lengkap kunci + Engsel 352,500.00
Pas. Pintu P.V.C. ex. Moradon Typ 102 B Polos lengkap kunci + Engsel 480,100.00
Pas. Pintu P.V.C. ex. Moradon Typ 104 D Urat Kayu lengkap kunci + Engsel 435,000.00
Pas. Pintu P.V.C. ex. Moradon Typ 102 B Urat Kayu lengkap kunci + Engsel 577,300.00
Pas. Kusen Pintu P.V.C. ex Moradon Polos 235,000.00
Pas. Kusen Pintu P.V.C. ex Moradon Urat Kayu 270,500.00
Plat Asbes 100 x 100 tebal 5 mm 12,300.00
Plat Asbes 100 x 100 tebal 6 mm 14,300.00
Plat Fiber Semen Harflek 60x120 cm tbl. 5 mm 27,750.00
Plat Fiber Semen Harflek 100x100 cm tbl. 5 mm 39,600.00
Plat Fiber Semen Harflek 100x200 cm tbl. 5 mm 34,250.00
Fiber / Asbes semen gelombang 250x92x0,5 cm 37,800.00
Fiber / Asbes semen gelombang 300x105x0,4 cm 64,500.00
Fiber / Asbes semen gelombang 270x105x0,4 cm 60,000.00
Fiber / Asbes semen gelombang 240x105x0,4 cm 50,300.00
Fiber / Asbes semen gelombang 210x105x0,4 cm 46,470.00
Fiber / Asbes semen gelombang 180x105x0,4 cm 39,237.50
Fiber / Asbes semen gelombang 150x105x0,4 cm 34,000.00
Fiber / Asbes semen gelombang 300x108x0,5 cm 73,800.00
Fiber / Asbes semen gelombang 270x108x0,5 cm 63,000.00
Fiber / Asbes semen gelombang 240x108x0,5 cm 49,800.00
Fiber / Asbes semen gelombang 210x108x0,5 cm 48,700.00
Fiber / Asbes semen gelombang 180x108x0,5 cm 47,100.00
Nok stil rata 92 cm 38,000.00
Nok stil rata 105 cm 20,100.00
Nok stil rata 108 cm 45,300.00
Kusen Alumunium Warna Ukuran 4" x 1 3/4" setara Alexindo
BESI DAN KAWAT
Paku uk. 3 cm 18,000.00
Paku asbes 12,300.00
Paku seng 11,700.00
Paku gypsum 15,300.00
Kawat beton 9,300.00
Paku uk. 10-15 cm 12,000.00
Kawat las harmonika 17,300.00
Kawat las listrik 14,500.00
Besi beton bulat Polos 6,700.00
Besi beton ulir 7,400.00
Baja IWF ex.DN SII 8,500.00
Baja Canal C 8,200.00
Rangka Atap Baja Ringan ( Steel Fast) : 175,000.00
- Trusses (Kuda-kuda) dan Rafter
- Batten dan Bracing Tipe B ukuran 45 B50
- Wall Plate Tipe W ukuran 75 W0.8 dan 75 W10
- Pryda Connector & Others
Plat Alumunium 0,3 mm 50,700.00
Pintu Air :
Lebar b = 0,50 s/d 0,70 meter, Tinggi h = 1,00 s/d 2,00 meter 7,158,300.00
Lebar b = 0,50 s/d 0,70 meter, Tinggi h = 2,00 s/d 3,00 meter, Tebal Plat 5 mm 9,372,500.00
Lebar b = 0,75 s/d 1,20 meter, Tinggi h = 1,00 s/d 2,00 meter, Tebal Plat 5 mm 10,337,200.00
Lebar b = 0,75 s/d 1,20 meter, Tinggi h = 2,00 s/d 3,00 meter, Tebal Plat 5 mm 16,145,800.00
Besi Siku/Profil
Aspal Panas (ex. Cilacap)
- Drum
- Curah
Aspal dingin Emulsi

Asphal Conkrete (AC)


Hotmix Asphal Treated Base (ATB) 7 cm 897,717.00
Hot Rolls Shect (HRS)
Aspal PC/TC
Flex ton
Wiremesh :
-M5 140,000.00
-M6 218,900.00
-M7 301,200.00
-M8 37,037.04
- M 10 544,800.00
- Bondex 80,000.00
- Wind Bracing dia : 12 mm 150,000.00
- Trekstang Dia : 12 x 1000 mm + Mur 20,000.00
- Trekstang Dia : 12 x 400 mm + Mur 10,000.00
- Bolt + Nut dia : 5/8" x 2" ( HTB ) 7,000.00
- Bolt + Nut dia : 1/2:x 1" ( HTB ) 3,000.00
- Atap Zinkalume 0,4 Ex Cahaya Deck 95,000.00
- Nok Zinkalume 0,4 Ex Cahaya Deck 45,000.00
- Listlank Zinkalume 0,3 mm 60,000.00
- Talang datar dari fibre 195,000.00
- Talang tegak dari PVC dia. 3 " 35,000.00
- Bolt + Nut dia : 3/4" x 2" ( HTB ) 10,000.00
- Bolt + Nut dia : 5/8" x 2" ( HTB ) 7,000.00
- Floor Deck 0,75 mm 125,000.00
- Stek Beugel Dia : 16 mm 9,500.00

Pagar Panel Beton Precast :


- Tinggi pagar 5 panel/ 2 m, panjang kolom 3 m, mutu beton K225 255,000.00
- Tinggi pagar 6 panel/ 2.4 m, panjang kolom 3.5 m, mutu beton K225 300,000.00
- Tinggi pagar 7 panel/ 2.8 m, panjang kolom 4 m, mutu beton K225 305,000.00
- Tinggi pagar 8 panel/ 3.2 m, panjang kolom 4.5 m, mutu beton K225 360,000.00
Mesin Pompa Air Type GTR Cap. 100 lt/det 6,395,000.00
Diesel Engine Type TS 230R 34,115,000.00
Pagar BRC Ukuran :
- 0.9 x 240 48,000.00
- 120 x 240 58,000.00
- 150 x 240 258,000.00
- 180 x 240 273,000.00
Assesories Pagar BRC : Penjepit, Tutup, Tiang, Baut 72,000.00
Kawat Berduri 44,300.00
Tombak Pagar Besi 61,000.00

LISTRIK MEKANIKAL
NYM 300/500 V, SNI.04-02698,SPLN 42-2, GT KABEL
1. 2X2,5 mm2
2. 2X1,5 mm2
3. 3X1,5 mm2
4. 4X1,5 mm2
5. 3X2,5 mm2
NYR/FGBY 0.6/1kV, SNI.04-02700, SPLN 43-2, IEC 60502-1 GT.KABEL
1. 4X10 mm2
2. 4X25 mm2
3. 4X35 mm2
4. 4X50 mm2
5. 4X16 mm2
KABEL PILIN (TWISTED CABLE)
1. 2X16 mm2
2. 4X16 mm2
3. 4X25 mm2
4. 4X35 mm2
5. 2X10 mm2
KABEL NYY SPLN
1. Kabel NYY 3 x 4
2. Kabel NYY 4 x 1,5
3. Kabel NYY 7 x 1,5
TIANG PJU DAN PERLENGKAPANNYA
1. Tiang PJU Tanam PRESS BOTTLE
a. H = 9 M Uk.5''.4".3".2" - 200 kg
b. H = 10 M Uk.5".4".3".2"
c. H = 11 M Uk. 6".5".4".2,5" - 240 kg
2. Tiang PJU Galvanis Octagonal Cabang 1
a. H = 10 M
b. H = 11 M
c. H = 12 M
3. Tiang PJU Galvanis Octagonal Cabang 2
a. H = 10 M
b. H = 11 M
c. H = 12 M
4. Stang Ornamen 2" GALVANIS tanpa Sok
a. L = 1 M
b. L = 1,5 M
c. L = 2 M
d. L = 2,5 M
e. L = 3 M
f. L = 5 M
g. L = 6 M
5. Stang Ornamen 2" GALVANIS dengan Sok
a. L = 1,5 M
b. L = 2 M
c. L = 2,5 M
d. L = 3 M
e. L = 5 M
f. L = 6 M
6. Tiang PJU Galvanis Octagonal Cabang 4
a. Tiang Lampu Sorot 10 m
b. Tiang Lampu Sorot 11 m
c. Tiang Lampu Sorot 12,
7. Tiang Lampu Taman
a. Tiang Lampu Antik Cab. 1 lengkap
b. Tiang Lampu Taman Cab. 2 lengkap
c. Tiang Lampu Neon / TL
d. Tiang Lampu Antik HPIT + Base Plate
PHB (Panel Hubungan Bagi)
PHB Induk Ukuran 130 x 80 x 50 2,105,400.00
PHB Induk Ukuran 80 x 60 x 40 960,000.00
PHB 60x50x30 600,000.00
PHB 20x30x40 227,300.00
Box Panel KWH Meter 70 x 50 x 40 660,200.00
NFB 100 A
Time Switch 6 Ampere Digital
Kunci Gembok Pernekel 60 mm
Flasher 25 A
Photo Cell 220/6 A
Relay 220 V, 10 A
MCB 6 A, 10 A 45,200.00
MCB 32 A 40,000.00
Timer Contactor Digital 100A
Contaktor 25 A
Contactor 100 A / 125 A
Koil Kontraktor 100 A
NH Fuse 63 A
NH Fuse 50 A
Holder Fuse
NH Fuse 100 A
NH Fuse 250A
Fatron 63 A Lengkap
Saklar, Broco 10,800.00
Flat Tembaga
Ground 30 QA
Lampu Indikator
Kabel Schunt/Sepatu Kabel Cu 25, 35 mm
Kabel Schunt/Sepatu Kabel Cu 50 mm
NFB 100 A - 125 A
Tralis/Karangkeng Pengaman Box panel PJU
Ukuran : P = 1,70 M, L = 0,65 M, T = 1,35 M
Tralis/Karangkeng Pengaman Box panel PJU
Ukuran : P = 0,85 M, L = 0,65 M, T = 1,35 M
ARMATUR LAMPU dan Komponennya
Armatur SPP 368/250 watt silver
Armatur HRX 811/250 Watt
Armatur HRX 811 Kecil
Armatur SRP 810/70 watt silver
Armatur SMF 383/400 watt
Armatur SMF 383/250 watt
Armatur TRX 800
Armatur Lengkap Merrcury 250 Watt
Armatur Lengkap Merrcury 125 Watt
Cover Lampu Taman Mika / Acrilic
Ballast untuk Lampu Mercurry
a. Ballast 250 Watt
b. Ballast 125 Watt
Ballast untuk Lampu SON, HPIT dan TL
a. Ballast 250 Watt
b. Ballast 70 Watt L 202
c. Ballast HPIT 400 Watt
d. Ballast SON T 1000 Watt
e. Ballast & Timer Dimming System
f. Ballast BTA 18L05 LW Insert
Capasitor type 7 uf/250 V
Capasitor
- Capasitor 250 Watt (32UF)
- Capasitor 400 Watt (50UF)
- Capasitor 70 Watt (12UF)
Ignitor
- Ignitor 70 - 600 Watt SN 58
- Ignitor 1000 Watt SN 59
- Ignitor HPIT 400 WS 1 - 51
Fitting Keramik E 27
Fitting Keramik E 40
Lampu ML 160 Watt 55,000.00
Lampu SON 250 Watt 143,000.00
Lampu SON 70 Watt 93,500.00
Lampu SON I 70 Watt 101,200.00
Lampu SON T 1000 Watt 618,200.00
Lampu Mercurry 250 Watt 66,000.00
Lampu HPIT 400 Watt 260,700.00
Lampu Mercurry 125 Watt 38,500.00
Lampu Cabang Hias Pohon 759,600.00
Lampu Cabang Hias Tiang 673,850.00
Lampu Selang Gedung Per 10 M 542,500.00
Control TTL ( Lampu Lalu Lintas ) 42,476,500.00
Control Warning Light 10,320,000.00
Box Lampu 3 Aspek Diameter 20 Cm 3,223,500.00
Box Lampu 2 Aspek Diameter 20 Cm 2,149,000.00
Tiang Lengkung Galvanis 2,509,500.00
Tiang Lurus / Pendek Galvanis 1,480,500.00
Tiang Rambu Diameter 2, Pajang 4 Meter 381,000.00
Tiang Rambu Diameter 2,5 , Pajang 4 Meter 463,250.00
Tiang Rambu Diameter 3 , Pajang 4 Meter 1,083,000.00
Terminal Kabel 20,250.00
Rambu Standar Tiang 4m, 2" dgn Panel 60 cm Terpasang 740,300.00
Rambu Standar Tiang 4m, 2" dgn Panel 60 cm dan Papan Tambahan Terpasang 823,550.00
Papan Nama Jalan Tiang 3m 2" Terpasang 619,600.00
Rambu Tiang Mode F, Tiang 6 m, 4" dgn papan Tambahan Terpasang 5,340,350.00
Rambu Tiang Mode F, Tiang 6 m, 4" Tanpa Papan Tambahan Terpasang 4,950,850.00
RPPJ Model Kupu-kupu Tiang 7m, 6" dengan Panel 120 cm x 180 cm, Terpasang 7,379,500.00
RPPJ Model Kupu-kupu Tiang 7m, 4" dengan Panel 120 cm x 180 cm, Terpasang 7,379,500.00
RPPJ Model F Tiang 7m, 4" dengan Panel 160 cm x 240 cm, Terpasang 4,465,500.00
Panel Rambu Diameter 90 cm, dengan Plat Alumunium Tebal 1,8 mm (Full) 846,250.00
Panel Rambu Diameter 75 cm, dengan Plat Alumunium Tebal 1,8 mm (Full) 573,000.00
Panel Rambu Diameter 60 cm, dengan Plat Alumunium Tebal 1,8 mm (Full) 380,500.00

HARGA PEMASANGAN DAN PEKERJAAN


LAPANGAN LALU LINTAS
1. Pengeboran Jalan Aspal
2. Penggelaran Kabel
3. Pemasangan Pipa Pelindung
4. Galian Tanah
5. Pengecoran Angkur/Pondasi Tiang Lengkung
6. Pengecoran Angkur/Pondasi Tiang Lurus
7. Pengecoran Patok Pengaman
8. Pembuatan Pondasi Box Contoller
9. Set Terminal Kabel
10. Pasang dan set Box Lampu
11. Pemasangan Grounding
12. Pengecetan Tiang Dan Patok
13. Biaya Penyambungan PLN
14. Biaya Pemrograman
15. Pengiriman Barang ke Lokasi
16. Kalibrasi alat penguji kendaraan bermotor

ALAT-ALAT BANTU
1. Stoping Buckle / link
2. Strain Wedge Clamp SCW 25-35
3. Stainless Stell Strap 0,7x20x50 mm
4. Stoping Plate
5. Klem Stang Ornamen t = 4 mm Lengkap
6. Isolasiband Unibell besar
7. Jointing 35 mm
8. Stop Conector
9. Wedge Clamp SCW 10-16
10. Pipa Galvanis 2" - 6 m Medium
11. Pipa PVC 2"
12. Pipa PVC 1/2 "
Patok Km 75,000.00
14. Cermin Lalu Lintas, Diameter 100 cm
15. Road Stud (Paku Marka)
Deliniator Plastik 15,000.00
17. Traffic Cones
- Impor
- Lokal
18. Marka Lajur
19. Zebra Cross
20. Pita Penggaduh ( Rubber Short )
21. Bola Lampu 60 Watt (Khusus Traffic Light)
22. Tambang Nilon
23. Gergaji Besi
24. Gergaji Mesin Ukr. Kecil type merk STIHL MS 380.72,2cc
25. Gergaji Mesin type merk STIHL MS 0,70. 106cc
26. Rantai gergaji 0.70
27. Rantai gergaji merk Steel 380
28. Pisau Tempa
29. Pisau Cutter
30. Sarung Tangan
31. Sabuk Pengaman
32. Tang
33. Mata Gergaji
34. Palu 1 kg
35. Martil palu Besi Ukr. Besar 5 Kg merk Bodem 10 LBS
36. Martil palu Besi Ukr. Besar 10 Kg merk Bodem 10 LBS
Klem
Klem Galvanis
Dop Galvanis 3"
Rantai Besi
Tang Potong Merk Tekiro
Tambang Dadung 1/2 Inch

PEMIPAAN
Tanki HU
Tanki HU (kap. 3 m3) PE 5,526,000.00
Tanki HU (kap. 3 m3) Fiber 5,928,600.00
Tanki HU (kap. 4 m3) 6,451,300.00
Ball Valve 1 inch (KW2). Bronze 222,900.00
Rantai dan Kunci pengaman Valve 1" 71,200.00
Shock drat Dalam 1 inch (PVC) 8,400.00
Shock drat Luar 1 inch (PVC) 8,300.00
Shock dart Dalam 3/4" (GIP) 9,300.00
Pipa PVC dia. 4 inch, klas D 23,300.00
Pipa PVC dia. 6 inch, S-12,5 154,500.00
Pipa PVC dia. 4 inch, S-12,5 75,600.00
Pipa PVC dia. 3 inch, S-12,5 60,000.00
Pipa PVC dia. 2 inch, S-12,5 48,300.00
Pipa PVC dia. 2 inch, S-10 49,800.00
Pipa PVC dia. 1 inch, S-12,5 8,200.00
Pipa PVC dia. 3/4 inch 5,000.00
Pipa Galv Hitam (Medium) dia 8 inch 403,800.00
Pipa Galv Hitam (Medium) dia 6 inch 278,600.00
Pipa Galv Medium dia 6 inch 333,500.00
Pipa Galv Medium dia 4 inch 219,400.00
Pipa Galv Medium dia 3 inch 189,300.00
Pipa Galv Medium dia 2 inch 112,200.00
Pipa Galv Medium dia 3/4 inch 37,400.00
Pipa PVC Pelindung Kabel 48,500.00
Pipa Besi Pengaman Kabel PLN 109,900.00
Gate Valve 6 inch, double flanged, CI, PN 10
Gate Valve 4 inch, double flanged, CI, PN 10
Gate Valve 3 inch, double flanged, CI, PN 10
Gate Valve 2 inch, double flanged, CI, PN 10
Box Valve/street 4 inch
Loose Flange 6" PN 10 (Steel)
Loose Flange 4" PN 10 (Steel)
Loose Flange 3" PN 10 (Steel)
Loose Flange 2" PN 10 (Steel)
Water Mur dia 3/4" 7,300.00
Floating Valve dia 3/4" 85,700.00
Angker dia 1/2" 35,500.00
Meter Air 3/4" 767,500.00
Rumah Meter 118,900.00
Dudukan 33,200.00
Ball Valve 3/4", Bronze
Double niple 3/4" Gl
Plug Valve 3/4" (+segel kran)
Feet Valve 3/4" (CI)
Check Valve 3/4", GI
Giboult Joint 8" (for PVC) (CI)
Giboult Joint 6" (for PVC) (CI)
Giboult Joint 4" (for PVC) (CI)
Giboult Joint 3" (for PVC) (CI)
Giboult Joint 2" (for PVC) (CI)
Air Vent Valve 1" (Screw Outside)
Air Vent Valve 3/4" (Screw Outside)
Elbow 3/4" PVC, 90
Elbow Gl 6", 45
Elbow all flange CI 4", 45
Elbow all flange CI 2", 45
Elbow all socket PVC 6", 90
Elbow all socket PVC 6", 45
Elbow all socket PVC 6", 22,5
Elbow all socket PVC 4", 90
Elbow all socket PVC 4", 45
Elbow all socket PVC 4", 22,5
Elbow all socket PVC 3", 90
Elbow all socket PVC 2", 90
Elbow all socket PVC 2", 45
Tee all flange (CI) 100 x 50 mm
Tee all socket 200 x 50 mm
Tee all socket 150 x 150 mm
Tee all socket 150 x 100 mm
Tee all socket 150 x 75 mm
Tee all socket 150 x 50 mm
Tee all socket 100 x 100 mm
Tee all socket 100 x 75 mm
Tee all socket 75 x 75 mm
Tee all socket 75 x 50 mm
Tee all socket 100 x 50 mm
Tee SC 50 x 50 mm
Reducer PVC 100 x 75 mm
Reducer PVC 75 x 50 mm
Clamp Saddle 4"
Clamp Saddle 3"
Clamp Saddle 2"
Flanges sc/sp 6" (CI/PVC)
Flanges sc/sp 4" (CI/PVC)
Flanges sc/sp 3" (CI/PVC)
Flanges sc/sp 2" (CI/PVC)
End Cap 6"
End Cap 4"
End Cap 3"
End Cap 2"
IWF ex Japan
Besi Profil ex DN SII
Seal Tape 8,500.00
Lem PVC 6,100.00
Karet Seal 1 inch 5,300.00
Gerobak Air (dorong) kap. 4 unit jerigen
Rantai dan kunci pengaman gerobak
Pompa Angin 65,000.00
Jerigen 20 lt. Mat PP/PE
Jerigen 10 lt. Mat PP/PE
Slang Plastik serat pj. 2,5 m + nozzle 1/2" 73,050.00
Bensin 4,500.00
Cat Marka / Thermoplastik 45,800.00
Glass Bit 24,750.00
Plastik 2,250.00
Giotextile 33 gr 30,000.00

PERTAMANAN
RUMPUT ( LAWN )
1. Rumput embun (Polytrias sp) lempeng 8,000.00
2. Rumput Gajah (Axonopus sp)
- Tandur 6,000.00
- Lempeng,jarak Lempeng + 2 cm 9,500.00
3. Rumput Golf (Tifton grass) tandur 12,100.00
4. Rumput Manila (Zoysia Matrela), jarak lempeng 2 Cm 7,900.00
5. Rumput Manila (Zoysia Matrela), tandur 7,950.00

PERDU
1. Agave putih (Ageve sp) tinggi 40 cm 13,500.00
2. Agave biasa (Ageve sp) tinggi 50 cm 14,000.00
3. Bugenvil hawai (bougainvillea sp) tinggi 60 cm 25,000.00
4. Mawar putih (rosa hybrida) tinggi 25 cm 5,600.00
5. Mawar Merah (rosa hybrida) tinggi 30 cm 12,770.00
6. Melati costa (jasminum sp) tinggi 50 cm 12,800.00
7. Melati gambir (jasminum sp) tinggi 50 cm 6,800.00
8. Soka Bangkok (Ixora sp) tinggi 20 cm 5,800.00
9. Soka Jepang bunga orange (Ixora sp) tinggi 20 cm 5,800.00
10. Soka philipina (Ixora sp) tinggi 20 cm 6,500.00
11. Soka siantan (Ixora sp) tinggi 20 cm 5,600.00
12. Soka singapuran (Ixora sp) bunga putih, pink, merah, tinggi 20 cm 3,200.00
13. Soka jawa/hawai (Ixora sp) tinggi 30 cm 3,200.00
14. Blue Eye
15. Herbras merah
16. Plumbago
17. Lili brazil putih
18. Crosandra
19. Bayam merah
20. Airis
21. Pandan duri kuning
22. Bakung air mancur
23. Canna

TANAMAN PAGAR
1. Kedondong laut (Nothopanax sp) tinggi 60-75 cm 20,100.00
2. Kemuning Murraya paniculata) tinggi 75 cm 14,200.00
3. Lantana pagar (lantana camara) tinggi 30 cm 3,750.00
4. Mangkokan (Nothopanax sp) tinggi 50 cm 6,400.00
5. The-tehan (Durantha repens) tinggi 50 cm 1,900.00

TANAMAN HIAS
1. Beringin bonsai (Ficus) tinggi 100 - 200 cm 96,500.00
2. Beringin bonsai bentukan (Ficus benjamina ), tinggi 100 - 200 cm 191,785.00
3. Beringin bonsai putih (Ficus benjamina ), tinggi 100 - 200 cm 536,635.00
4. Bonsai serut tinggi 100 - 150 cm 330,966.00
5. Bonsai serut tinggi 151 - 200 cm 508,680.00
6. Nusa indah merah / putih (Nussaenda sp) tinggi 50 cm 11,700.00
7. Pakis kelabang hijau Neprolephis sp) tinggi 40 cm 5,900.00
8. Pakis kelabang kuning Neprolephis sp) tinggi 40 cm 6,150.00
9. Pisang kipas (Revenela Madagaskariensis), tinggi 200 - 250 cm 27,300.00
10. Kamboja Kuning (Bali) tinggi 150 - 200 cm 430,000.00
11. Kamboja orange tinggi 150 - 200 cm 430,000.00

PALEM
1. Kelapa gading tinggi 200-250 cm 343,390.00
2. Kelapa sayur tinggi 200-250 cm 316,000.00
3. Kurma tinggi > 100 2,550,000.00
4. Kurma tinggi 100 1,775,000.00
5. Palm anggur tinggi 100 155,500.00
6. Palm botol diameter tinggi 150-200 230,900.00
7. Palm jepang (Ptychosperma macarthurii), tinggi 150 - 250 cm 85,000.00
8. Palm kuning (Chrysalidicarpus lutescens), tinggi 100 - 150 cm 20,100.00
9. Palm merah (Cyrtotachis lakka) tinggi 150 - 200 cm 84,000.00
10. Palm merah (Cyrtotachis lakka) tinggi 300 - 350 cm 155,000.00
11. Palm phoenik (Phoenik sp) tinggi 75 - 100 cm 88,900.00
12. Palm phoenik (Phoenik sp) tinggi 150 - 200 cm 257,500.00
13. Palm Raja (Oredoxa regia) Tinggi 100-200 cm 193,000.00
14. Palm Raja (Oredoxa regia) Tinggi 200-300 cm 301,500.00
15. Palm Ratu tinggi 100 - 150 cm 79,500.00
16. Pinang sirih (Areca catechu) tinggi 200 cm 83,600.00

BAMBU DAN CEMARA


1. Bambu kuning tinggi 150 cm
2. Bambu Jepang (Phyliastachis aurea) tinggi 200 cm
3. Cemara kuning daun emas (cupressus sp) tinggi 150 cm
4. Cemara halus (Araucaria cuninghamii) tinggi 150 cm
5. Cemara kipas tinggi 100 - 150 cm
6. Cemara lilin tinggi 100 cm
7. Cemara Natal (Cupressus sp) tinggi 75 cm
8. Cemara Norfolk (Araucaria sp) tinggi 400-500 cm
9. Cemara tiang tinggi 100 - 140 cm
10. Pinus (Pinus merkusii) tinggi 400 cm

TANAMAN BUAH-BUAHAN
1. Aren (Arenga catecu) tinggi 100 cm
2. Belimbing (Averhoa carambola) tinggi 75 cm
3. Bintari tinggi 150 cm
4. Durian (Durio zibethinus) tinggi 100 cm
5. Jamblang tinggi 300-400 cm
6. Jambu air (Eugenia aquea) tinggi 400-500 cm
7. Jambu Bol (Eugenia malaccensis) tinggi 100 cm
8. Jambu Mawar (Eugenia Jambos ) tinggi 100 cm
9. Kantil (Michelia champaca) tinggi 100 cm
10. Kecapi (sandoricum koetjape) tinggi 150 cm
11. Kedondong (Spondias pinnata) tinggi 500 cm
12. Kenanga (Cananga odorata) tinggi 50 cm
13. Kelengkeng tinggi 100 cm
14. Lobi-lobi (Flacourtia inermis) tinggi 150 cm
15. Melinjo (Gnetum gnemon) tinggi 500 cm
16. Nangka (Artocarpus heterrophyllus) tinggi 100 cm
17. Pala tinggi 200 - 300 cm
18. Petai tinggi 300 - 400 cm
19. Rambutan tinggi 50 cm
20. Salam tinggi 200 - 300 cm
21. Sawo kecik (Manilkara kauki) tinggi 200 cm
22. Sawo Kecik (Manilkara kauki) tinggi 300 - 400 cm
23. Serikaya tinggi 50 cm

TANAMAN TEDUH (INDOOR PLANTI)


1. Anggrek bulan tinggi 40-50 cm
2. Anggrek cathalea tinggi 40-50 cm
3. Anggrek Douglas kecil tinggi 40-50 cm
4. Golden shower tinggi 50 cm
5. Ganda sari tinggi 30-40 cm
6. Kembang Kancing tinggi 30-40 cm
7. Kencuran tinggi 30-40 cm
8. Kuping Gajah tinggi 30-40 cm
9. Kuping Keledai tinggi 30-40 cm
10. Maranta batik,buntut ayam,kerisdan sepat
11. Meranti bintik,kol, mas koki dan pisang
12 Monstera
13. Mutiara
14. Pacing
15. Peplan putih
16. Sabrina ungu
17. Simbar menjang
18. Sinterklas hijau
19. Sri rejeki
20. Supelir foster kasar
21. Supelir foster halus
22. Tanduk Rusa
23. Walisongo Biasa
24. Walisongo Kuning

POHON PELINDUNG
Angsana (Pterocarpus Indikus)
Asem Keranji (Pithecelluobium dulce)
Biola cantik
Buni
Batavia
Beringin (Ficus benjamania) Tinggi 150 - 200 cm
Bisbul (Diospyros dicolor)
Bunga kupu-kupu (Bauhinia purpurea)
Bunga saputangan (Amherstia nobilis) Tinggi 150 - 200 cm
Bungur (Lagerstromea loudonii) Tinggi 200 - 300 cm
Cassia glauca
Cempaka kuning (Michelia champaca) Tinggi 150-200 cm
Ceremai
Dadap hutan (Erythrina sp)
Damar (Agathis alba) Tinggi 150 cm
Flamboyant Delonix regia)
Gemelina
Glauka
Glodogan
Glodogan (Polyalthea longifolia) Tinggi 150 - 200 cm
Jatimas
Jakaranda (Jacaranda acutifolia)
Johan
Kamboja Putih (Plumeria rubra)
Kamoja Rantai
Karet kebo
Kasia bunga kuning (Cassia)
Kastuba (Euphorbia pulcherrima )
Kayu manis (Cinnamon bumanni) tinggi 200cm
Kayu putih (Maleucaa leucandendron)
Kembang kupu-kupu (Bauhinia pupurea)
Kembang Sepatu Kuning
Kenari, Tinggi 100 - 150
Ketapang, Tinggi 150 - 200
Kiara payung, Tinggi 150 - 200
Kurma, Tinggi 50
Mahoni, Tinggi 300 - 400
Mangga
Salam, Tinggi 50 - 100
Sikat Botol, Tinggi 200 - 300
Sawo Duren, Tinggi 150 - 200
Sawo Kecik, Tinggi 200
Tanjung Tinggi 200 - 300
Trembesi, Tinggi 200
Walisongo, Tinggi 200
Waru 2-3 m

BENIH
Bixa Diameter 1 Cm
Bunga Kupu-kupu Diameter 1 Cm
Bungur Diameter 1 Cm
Buni Diameter 1 Cm
Glodongan Diameter 1 Cm
Mahoni Diameter 1 Cm
Salam Diameter 1 Cm
Tanjung Diameter 1 Cm
Trembesi Diameter 1 Cm

TANAMAN HIAS YANG MIMILIKI NILAI KHUSUS


Anthurium Tinggi 50 Cm
Bonsai Bentuk Tinggi 50 Cm
Cemara Udang Tinggi 50 - 100 Cm
Kamboja Jepang Bentuk Tinggi 100 - 200 Cm
Krisan Pot Tinggi 100 - 200 Cm Kondisi Optimal
Lotus Tinggi 30 - 40 Cm Kondisi Optimal
Melati Air Tinggi 40 - 50
Meranti Pisang Tinggi 100 Cm
Palem Segitiga Tinggi 150 - 200 Cm
Pandan Bali Tinggi 150 - 200 Cm
Philodendron Kuning/Merah Tinggi 50 Cm
Srikit Bangkok Tinggi 40 - 50 Cm
Teratai Biasa Tinggi 10 - 20 Cm
Zannia Tunggal Tinggi 50 Cm

MATERI PELENGKAP
Batu Api Besar/Sedang Tinggi 25 - 50 Cm 52,500.00
Batu Ares 18,000.00
Batu Bintang 27,750.00
Batu Brojol Hitam Bengkulu 32,750.00
Batu Cadas Besar / Sedang Tinggi 50 Cm 22,500.00
Btu Kayu Besar/Sedang Tinggi 50 Cm 50,250.00
Batu Tempel Cirebon Alam berbagai jenis ukuran, diameter 8 x 20 22,250.00
Batu Tulang Besar/Kecil 37,000.00
Gentong Teratai Sedang 100,000.00
Kromb. Dolken segitiga kawat duri 17,000.00
Pot Plastik diameter terra cotta clarris 128,000.00
Pot californian shell dari GK 999,000.00
Pot Grapevine dari GK 1,007,500.00
Pot Athena dari GK 947,500.00
Pupuk Majemuk butir - prill 6,000.00
Pupuk Kandang 12,500.00
Pupuk Kompas 4,500.00
Pupuk NPK 6,700.00
Pupuk TSP 7,700.00
Pupuk Area 5,300.00
Pupuk ZA 6,600.00
Serbuk Gergaji 7,600.00
Steger Bambu bulat/dolken 4,800.00

PEMELIHARAAN TAMAN
Angkut sampah sistim door to door
Angkut sampah sistim tidak langsung
Jasa pemeliharaan/perawatan
Pembersihan sampah di lokasi air mancur
Pengangkutan sampah
Penyapuan sampah
Pohon Di Halaman
a. Penyiraman
b. Pemberantasan Hama dengan insektisda
c. Pemupukan
d. Pendangiran
Pohon dalam Pot
a. Penyiraman
b. Pemberantasan Hama dengan insektisda
c. Pemupukan
d. Pendangiran
Rumput
a. Penyiraman pd lokasi taman yg mempunyai sumber air
b. Penyiraman pd lokasi taman tanpa sumbe air
c. Pengetrikan ditaman/berm
d. Pembabatan
e. Pembabatan rumput liar/alang-alang
Tanaman Hias dan Perdu
a. Penyiraman
b. Pemberantasan hama dengan insektisida
c. Pemangkasan
d. Pemupukan
e. Pendangiran

PERBAIKAN TAMAN AKIBAT GALIAN


JARINGAN UTILITAS
Pot Decoratif bhn tanah
a. Cawan besar T - 50 D - 100 Cm
b. Gelas besar T - 50 D - 80 Cm
Penanaman Pohon Baru (termasuk pemeliharaan selama 3 bln)
a. Kelas I T1/2M
b. Kelas II T1/2M
c. Kelas III T1/2M
Bolder (termasuk pemeliharaan selama 3 bln)
a. Kelas I
b. Kelas II
c. Kelas III
Rumput gajah (termasuk pemeliharaan selama 3 bln)
Satuan No Nama Barang

A PASIR DAN BATU


m3 1 Pasir urug darat
m3 2 Pasir pasang
m3 3 Pasir Beton
m3 4 Pasir extra beton
m3 5 Pasir putih (bangka)
m3 6 Sirtu
m3 7 Split
m3 8 Koral Beton
m3 9 Tanah merah
m3 10 Batu Pecah/Split ukr. 1 - 2 cm
m3 11 Batu Pecah/Split ukr. 2 - 3 cm
m2 12 Macadam ukr. 0 - 7 cm
13 Batu kali belah
m2 14 Abu Batu 5 mm
m2 15 Screening 5 - 13 mm
m2 16 Batu bata merah press mesin
m2 17 Batu bata merah proses tangan
m2 18 Batako (campuran semen, pasir, abu batu)
m2 19 Batako full (campuran semen, batu apung/pumis)
m2 20 Kapur sirih
21 Tanah Merah
m2 22 Tanah untuk media tanam
m2 23 Lapisan permukaan batu tulung agung
m2 24 Air
m2 25 Karung
m2
m2 B SEMEN, KAPUR, DAN ASPAL
m2 B1 Semen
1 Semen Cibinong (Kujang) 50 kg
m2 2 Semen Tiga Roda 50 kg
m2 3 Semen Gresik 50 kg
m2 4 Semen Holcim 50 kg
m2 5 Semen Putih Tiga Roda 40 kg
m2
m2 B2 Aspal
m2 1 Hotmix Lapis AC-WC tebal 3 cm Lokal
krg 2 Hotmix Lapis AC-WC tebal 3 cm Import
krg 3 Hotmix Lapis AC-WC tebal 4 cm Lokal
krg 4 Hotmix Lapis AC-WC tebal 4 cm Import
m3 5 Hotmix Lapis AC-WC tebal 5 cm Lokal
m3 6 Hotmix Lapis AC-WC tebal 5 cm Import
m2
Bh C BAHAN KAYU
C1 Kayu Kamper Samarinda Oven
1 Balok kayu kamper samarinda oven uk. 8 x 15 x 400 cm
m2 2 Balok kayu kamper samarinda oven uk. 8 x 12 x 400 cm
m2 3 Balok kayu kamper samarinda oven uk. 6 x 15 x 400 cm
m2 4 Balok kayu kamper samarinda oven uk. 6 x 12 x 400 cm
m1 5 Balok kayu kamper samarinda oven uk. 5 x 10 x 400 cm
m1 6 Kaso kayu kamper samarinda oven uk. 5 x 7 x 400 cm
m2 7 Kaso kayu kamper samarinda oven uk. 4 x 6 x 400 cm
m2 8 Reng kayu kamper samarinda oven uk. 3 x 4 x 400 cm
m2 9 Reng kayu kamper samarinda oven uk. 2 x 3 x 400 cm
m2 10 Papan kayu kamper samarinda oven uk. 3 x 30 x 400 cm
m2 11 Papan kayu kamper samarinda oven uk. 3 x 20 x 400 cm
m2 12 Papan kayu kamper samarinda oven uk. 2 x 30 x 400 cm
m2 C2 Lainnya
m2 1 Dolken Ø 5 - 7 cm ukr. 350 - 400 cm
2 Dolken Ø 8 - 10 cm ukr. 350 - 400 cm
3 Kayu Kelas III
m2 C3 Kayu Lapis
m2 1 Teak Wood ukr. 92 x 210 x 3 mm
m2 2 Teak Wood ukr. 122 x 244 x 3 mm
m2 3 Teakwood ukr. 122 x 244 x 4 mm
m2 4 Teakwood ukr. 90 x 210 x 4 mm
m2 5 Formika ukr. 90 x 210 x 3 mm
bh 6 Formika ukr. 122 x 244 x 3 mm
m2 7 Bahan plafond hardplex 5 mm 120x240
m2 8 Bahan plafond asbes semen 5 mm
m2 9 Gypsum 9 mm 120 x 240 ex. DN
m2 10 Gypsum 12 mm 120 x 240 ex. DN
m2 11 Triplek ukr. 122 x 244 x 3 mm
m2 12 Triplek ukr. 122 x 244 x 4 mm
m2 13 Triplek ukr. 122 x 244 x 6 mm
m2 14 Multiplek ukr. 122 x 244 x 9 mm
m2 15 Multiplek ukr. 122 x 244 x 12 mm
m2 16 Multiplek ukr. 122 x 244 x 15 mm
m2 17 Multiplek ukr. 122 x 244 x 18 mm
m1 18 Block teak 122 x 244 tebal 18 mm 1 muka
m1 19 Block teak 122t x 244 tebal 18 mm 2 muka
m1 20 Melamin 122 x 244 x 3 mm
m1 21 Melamin ukr. 90 x 210 x 3 mm
m1 22 Step Nose 10 x 30
m1 23 Step Nose 10 x 20
m1 24 Daun Pintu Kayu Kamper Samarinda (Bukan Oven)
m1 25 Daun Pintu Kayu Kamper Samarinda Kualitas Export (Oven)
m1 26 Kusen dan Daun Pintu PVC ukuran standar
m1 27 Plywood Sungkat uk 4 x 8 x 3 mm
m1 28 Plywood Sungkat uk 4 x 8 x 4 mm
m1
m1 D SENG
m1 1 Seng gelombang 180 x 90 x 0.05
m1 2 Seng gelombang 180 x 90 x 0.03
m1 3 Seng gelombang 180 x 90 x 0.025
m1 4 Seng gelombang 180 x 90 x 0.2
m1 5 Plat seng tebal 0.05 cm lebar 0.9
m2 6 Plat seng tebal 0.03 cm lebar 0.9
m2 7 Plat seng tebal 0.025 cm lebar 0.9
m2 8 Plat seng tebal 0.020 cm lebar 0.9
9 Plat seng tebal 0.040 cm lebar 0.9
m2 10 Plat tipis uk 1 m
m2 11 Plat tebal uk 1 m
12 Seng Plat BJLS 28 (90 x 180) cm
m2 13 Seng Plat BJLS 32 L = 0,90 M
m2
F BESI DAN KAWAT
m2 1 Paku uk 1 cm
2 Paku uk 2 cm
m2 3 Paku uk 3 cm
m2 4 Paku uk 5 cm
m2 5 Paku uk 7 cm
m2 6 Paku uk 10 cm
7 Paku uk 12 cm
8 Paku uk 15 cm
zak 9 Paku Asbes
zak 10 Paku Seng
zak 11 Kawat beton
zak 12 Kawat beton
zak 13 Besi beton ulir/polos
kg 14 Besi plat strip
bh 15 Besi kanal "U" (channel)
bh 16 Besi plat hitam (segala ukuran)
bh 17 Besi plat putih (segala ukuran)
bh 18 Baja siku
m' 19 Bordes plat
Bh 20 Baja Wf
21 H Beam
22 Baja Beam (Wf + H Beam)
m3
m3 G CAT
m3 1 Cat kayu/besi PLATONE
m3 2 Cat kayu/besi MOWILEX
3 Cat kayu/besi KUDA TERBANG
m3 4 Kuas no. 4
m3 5 Kuas no. 3
m3 6 Kuas no. 2,5
m3 7 Kuas no. 2
8 Kuas no. 1
m3 9 Minyak Bekisting
m3 10 Cat Marka / Thermoplastik
11 Thinner
m3 12 Glass Bead
m3
m3 H Aksesoris
m3 1 spanduk
m3 2 AC split LG Plasma 1 pk
m3 3 Pompa Air Jet Pump Panasonic GN - 205HX
m3 4 Tangki Air Fiber 1 m3 bulat
m3 5 Menara Air
6 sanitasi mobile
m3 7 SONY CyberShot DSC-W310 (black)
m3 8 Plastik
m3 9 Median Concrete Barrier (Precast)
m3 10 Reflektor Merah/Kuning
11 Panel + Tiang Rambu STA
m3 12 Panel + Tiang Rambu Larangan
m3 13 Panel + Tiang Rambu Peringatan
m3 14 Panel Rambu Petunjuk 150 x 200 cm Tiang 7 m
m3 15 Guardrail Beam : Panjang 4320 mm x Lebar 312 mm x Tebal 2.7 mm
m3 16 PJU Tenaga Surya 30W LED Tiang Model Kupu-kupu
17 Genset Komatu WA-180
m3 18 Sewa Theodolite
m3 19 Sewa Alat Ukur
m3 20 Solar
21 Kabel NYA 1 x 2,5 mm2
m3 22 Meja Rapat Daiko
m3 23 Kursi Lipat Chitose Tipe Yasuka SL
btg 24 Meja Kerja uk. 1.5 x 0.8 m
btg 25 Filling Cabinet Elite B4-4 08 DX
m1 26 HP Presario CQ3622L
m1 27 Sewa Mesin Fotocopy Canon IC MF 4350d
m1 28 Fax Panasonic KXTS 505
m1 29 Whiteboard Daiko Double Face 90 x 120 cm
m1 30 Helm Proyek
btg 31 Jas Hujan
btg 32 Sepatu Proyek
m3 33 Payung

btg I SALURAN
btg 1 Saluran Beton Pracetak Dim 50-50
btg 2 Saluran Beton Pracetak Dim 50-70
btg 3 Penutup Saluran Beton Pracetak Dim 50
btg 4 Saluran Beton Pracetak Dim 60-70
btg 5 Penutup Saluran Beton Pracetak Dim 60
6 Saluran Beton Pracetak Dim 100-100
7 Penutup Saluran Beton Pracetak Dim 100
8 Box Culvert Pracetak Dim. 50-50
m1 9 Box Culvert Pracetak Dim. 60-60
m1 10 Box Culvert Pracetak Dim. 80-80
m1 11 Box Culvert Pracetak Dim. 100-100
m1 12 Box Culvert Pracetak Dim. 150-150
m1 13 Box Culvert Pracetak Dim. 200-200
m1 14 Box Culvert Pracetak Dim. 220-160
m1 15 Gorong-gorong precast dia 1,4 m
m1
m1 J PIPA GALVANIS
m1 1 Pipa Galvanis Dia 3"
btg 2 Pipa Galvanis Dia 2,0"
btg 3 Pipa Galvanis Dia 2,5"
btg 4 Pipa Galvanis Dia 4,0"
btg
btg K PIPA PVC VEGA
btg 1 Pipa PVC dia 1/2"
btg 2 Pipa PVC dia 3/4"
btg 3 Pipa PVC dia 1"
btg 4 Pipa PVC dia 1 1/4"
btg 5 Pipa PVC dia 1 1/2"
btg 6 Pipa PVC dia 2"
btg 7 Pipa PVC dia 2 1/2"
btg 8 Pipa PVC dia 3"
btg 9 Pipa PVC dia 4"
btg 10 Pipa PVC dia 5"
btg 11 Pipa PVC dia 6"
btg
btg L MCK
btg 1 Bidet Toto Type BW 5J W&PIV
btg 2 Colset Jongkok Merk Toto Tipe Standar
btg 3 Ember
btg 4 Bak mandi lokal fiber
btg
btg M PERTAMANAN
btg M1 Rumput (Lawn)
btg 1 Rumput embun (Polytrias sp) lempeng
btg 2 Rumput Gajah (Axonopus sp)
- Tandur
- Lempeng,jarak Lempeng + 2 cm
m3 3 Rumput Golf (Tifton grass) tandur
m3 4 Rumput Manila (Zoysia Matrela), jarak lempeng 2 Cm
m3 5 Rumput Manila (Zoysia Matrela), tandur
m3
m3 M2 Perdu
m3 1 Agave putih (Ageve sp) tinggi 40 cm
m3 2 Agave biasa (Ageve sp) tinggi 50 cm
bh 3 Bugenvil hawai (bougainvillea sp) tinggi 60 cm
4 Mawar putih (rosa hybrida) tinggi 25 cm
5 Mawar Merah (rosa hybrida) tinggi 30 cm
bh 6 Melati costa (jasminum sp) tinggi 50 cm
bh 7 Melati gambir (jasminum sp) tinggi 50 cm
bh 8 Soka Bangkok (Ixora sp) tinggi 20 cm
bh 9 Soka Jepang bunga orange (Ixora sp) tinggi 20 cm
bh 10 Soka philipina (Ixora sp) tinggi 20 cm
bh 11 Soka siantan (Ixora sp) tinggi 20 cm
bh 12 Soka singapuran (Ixora sp) bunga putih, pink, merah, tinggi 20 cm
bh 13 Soka jawa/hawai (Ixora sp) tinggi 30 cm
14 Kol Banda (Pisona Alba)

N READY MIX
bh 1 Ready Mix K 100 slump 12
bh 2 Ready Mix K 100 slump 14
bh 3 Ready Mix K 100 slump 16
bh 4 Ready Mix K 100 slump 18
5 Ready Mix K 125 slump 12
m 6 Ready Mix K 125 slump 14
m 7 Ready Mix K 125 slump 16
m' 8 Ready Mix K 125 slump 18
bh 9 Ready Mix K 175 slump 12
m1 10 Ready Mix K 175 slump 14
m1 11 Ready Mix K 175 slump 16
bh 12 Ready Mix K 175 slump 18
m1 13 Ready Mix K 225 slump 12
bh 14 Ready Mix K 225 slump 14
m' 15 Ready Mix K 225 slump 16
m' 16 Ready Mix K 225 slump 18
17 Ready Mix K 275 slump 12
m 18 Ready Mix K 275 slump 14
unit 19 Ready Mix K 275 slump 16
20 Ready Mix K 275 slump 18
btg 21 Ready Mix K 300 slump 12
btg 22 Ready Mix K 300 slump 14
btg 23 Ready Mix K 300 slump 16
btg 24 Ready Mix K 300 slump 18
btg 25 Ready Mix K 350 slump 12
btg 26 Ready Mix K 350 slump 14
btg 27 Ready Mix K 350 slump 16
btg 28 Ready Mix K 350 slump 18
btg
O PC I GIRDER POSTENSION
1 PCI Girder L = 12,6 m
m 2 PCI Girder L = 13,6 m
m 3 PCI Girder L = 14,6 m
m 4 PCI Girder L = 15,6 m
m 5 PCI Girder L = 16,6 m
m 6 PCI Girder L = 17,6 m
m 7 PCI Girder L = 18,6 m
m 8 PCI Girder L = 19,6 m
m 9 PCI Girder L = 20,6 m
m 10 PCI Girder L = 21,6 m
m 11 PCI Girder L = 22,6 m
m 12 PCI Girder L = 23,6 m
m 13 PCI Girder L = 24,6 m
m 14 PCI Girder L = 25,6 m
m 15 PCI Girder L = 26,6 m
m 16 PCI Girder L = 27,6 m
m 17 PCI Girder L = 28,6 m
m 18 PCI Girder L = 29,6 m
m 19 PCI Girder L = 30,8 m
m 20 PCI Girder L = 31,8 m
m 21 PCI Girder L = 32,8 m
22 PCI Girder L = 33,8 m
23 PCI Girder L = 34,8 m
m 24 PCI Girder L = 35,8 m
m 25 PCI Girder L = 36,8 m
m 26 PCI Girder L = 37,8 m
m 27 PCI Girder L = 38,8 m
m 28 PCI Girder L = 39,8 m
29 PCI Girder L = 40,8 m
m
m P DIAFRAGMA
m 1 Diafragma Pracetak K350 H 0,90
m 2 Diafragma Pracetak K350 H 1,25
m 3 Diafragma Pracetak K350 H 1,60
4 Diafragma Pracetak K350 H 1,70
m 5 Diafragma Pracetak K350 H 2,10
m
m Q ELASTOMER
m 1 Elastomer (300 x 350 x 36)
m 2 Elastomer (350 x 400 x 39)
3 Elastomer (400 x 450 x 45)
m 4 Elastomer (400 x 550 x 80)
m 5 Elastomer (400 x 300 x 40)
m 6 Elastomer (500 x 500 x 60)
m
m

m
m
m
m
m

m
m
m
m
m

m
m
m
m
m

m
m
m
m
m
m
m
m
m
m

m
m
m
m
m

m
m
m
m
m

m
m
m
m
m

m
m
m
m
m

m
m
m
m
m

m
m
m
m
m
m
m
m
m
m

m
m
m
m
m

m
m
m
m
m

m
m
m
m
m

m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m
m
m
m
m

m
m
m
m
m
m

m
m
m
m

m
m
m
m

m
m
m
m
m

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
klg
kg
kg
bh
bh
kg
ltr
kg
kg
kg
ltr
ltr
ltr
kg
lbr
kg
kg
kg
kg
kg
kg
kg
ltr
ltr
lbr
kg
ikat
ltr
ltr
ikat
ltr
ltr
Kg

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m'

m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
bh
bh
Unit
Unit
Unit

ps
ps
ps
ps
ps
bh
bh
bh
ps
ps
ps
ps
bh
bh
bh
bh
set
set
set
set
set
set

bh
bh
bh
bh
bh

bh
bh
bh
bh
bh
bh

bh
bh

bh
bh
bh

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Bh
Bh
bh
bh
lbr
m'
m'
bh
m2
m'
m'
m1
m1
m'
m'
m'
m'
m'
m'
m'
m'
m'
tube
m2
m2
bh
bh
bh
bh
bh
bh
bh
lb
lb
lb
lb
lb
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
btg

kg
kg
kg
kg
kg
kg
m
kg
kg
kg
kg
kg
m2
lbr

bh
bh
bh
bh
kg

kg
kg
kg

ton
ton
ton
Liter
kg

m2
m2
m2
m2
m2
m2
Pcs
Pcs
Pcs
Pcs
Pcs
M2
M
M
m'
m'
Pcs
Pcs
m2
kg

m
m
m
m
unit
unit

m'
m'
panel
panel

rol
kg

m
m
m
m
m

m
m
m
m
m

m
m
m
m

m
m
m

bh
bh
bh

bh
bh
bh

bh
bh
bh

bh
bh
bh
bh
bh
bh
bh

bh
bh
bh
bh
bh
bh

bh
bh
bh

bh
bh
bh
bh

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

bh
bh
bh
bh
bh
bh
bh
bh
Set
bh
Set
Set
Set
bh
bh
bh
bh

bh

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

bh
bh

bh
bh
bh
bh
bh
bh
bh

bh
bh
bh

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
bh
bh
bh
Set
bh
bh
bh
bh
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
bh
bh
bh

Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt

bh
bh
m
bh
bh
roll
bh
bh
bh
bt
bt
bt
bh
Unit
bh
bh

bh
bh
M2
M2
M2
M2
m
bh
Unit
Unit

btg
bh
bh
bh
bh
bh
bh
bh
bh
bh
Psg
Psg
Kg
bh
Kg

unit
unit
unit
unit
set
unit
unit
unit
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Btg
Btg
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
kg
kg
unit
unit
unit
unit
set
unit
unit
unit
unit
Ltr
Kg
Kg
m2
m3

m2

m2
m2
m2
m2
m2

Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot

Pot
Pot
Pot
Pot
Pot

Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Phn
Btg
Btg

phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn

dpr
dpr
phn
phn
phn
phn
phn
phn
phn
phn

phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn

pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot

phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn

kg
kg
kg
kg
kg
kg
kg
kg
kg
pot
pot
phn
phn
pot
rmp
rmp
phn
phn
phn
phn
phn
rmp
phn

bh
krg
krg
krg
bh
bh
m2
bh
bh
bh
bh
bh
bh
bh
kg
krg
krg
kg
kg
kg
kg
kg
btg

m3
m3
hr
lks
m3
m2

phn
phn
phn
phn

phn
phn
phn
phn

m2
m2
m'
m2
m2

m2
m2
m2
m2
m2

bh
bh

btg
btg
btg

m2
m2
m2
m2
Harga
Satuan
Satuan

Rp 135,000 m3
Rp 185,000 m3
Rp 177,000 m3
Rp 195,000 m3
Rp 185,000 m3
Rp 162,000 m3
Rp 185,000 m3
Rp 210,600 m3
Rp 32,500 m3
Rp 220,500 m3
Rp 189,000 m3
Rp 141,600 m3
Rp 165,000 m3
Rp 175,000 m3
Rp 194,000 m3
Rp 425 buah
Rp 325 buah
Rp 1,650 buah
Rp 2,365 buah
Rp 16,170 buah
Rp 54,400 m3
Rp 73,800 m3
Rp 335,500 m2
Rp 200 liter
Rp 2,800 m2

Rp 50,600 zak
Rp 55,000 zak
Rp 53,000 zak
Rp 53,500 zak
Rp 65,000 zak

Rp 881,174 ton
Rp 912,217 ton
Rp 873,185 ton
Rp 904,228 ton
Rp 871,904 ton
Rp 902,948 ton

Rp 5,136,000 m3
Rp 4,788,250 m3
Rp 4,713,350 m3
Rp 3,887,310 m3
Rp 5,561,325 m3
Rp 3,089,625 m3
Rp 3,033,450 m3
Rp 2,921,100 m3
Rp 2,921,100 m3
Rp 5,583,795 m3
Rp 5,617,500 m3
Rp 5,596,030 m3

Rp 15,750 btg
Rp 17,850 btg
Rp 1,200,000 m3

Rp 66,500 lbr
Rp 74,300 lbr
Rp 77,700 lbr
Rp 74,000 lbr
Rp 72,500 lbr
Rp 74,300 lbr
Rp 46,400 lbr
Rp 13,900 lbr
Rp 42,800 lbr
Rp 57,800 lbr
Rp 37,000 lbr
Rp 47,000 lbr
Rp 140,000 lbr
Rp 97,800 lbr
Rp 126,200 lbr
Rp 164,600 lbr
Rp 181,400 lbr
Rp 56,800 lbr
Rp 73,300 lbr
Rp 65,000 lbr
Rp 55,000 lbr
Rp 19,000 bh
Rp 16,000 bh
Rp 384,000 Unit
Rp 900,000 Unit
Rp 152,700 Unit
Rp 65,864 lbr
Rp 57,082 lbr

Rp 60,200 lbr
Rp 50,000 lbr
Rp 50,000 lbr
Rp 36,000 lbr
Rp 65,000 m
Rp 29,000 m
Rp 26,250 m
Rp 22,000 m
Rp 29,000 m
Rp 12,500 lbr
Rp 6,250 lbr
Rp 62,300 lbr
Rp 70,000 lbr

Rp 2,838 kg
Rp 2,903 kg
Rp 3,032 kg
Rp 3,870 kg
Rp 6,450 kg
Rp 9,675 kg
Rp 10,320 kg
Rp 11,610 kg
Rp 30,000 kg
Rp 4,700 kg
Rp 12,000 kg
Rp 10,126 kg
Rp 10,126 kg
Rp 10,604 kg
Rp 10,604 kg
Rp 10,604 kg
Rp 10,604 kg
Rp 10,925 kg
Rp 11,300 kg
Rp 11,700 kg
Rp 11,700 kg
Rp 11,700 btg

Rp 33,409 klg
Rp 54,000 klg
Rp 45,250 klg
Rp 16,675 buah
Rp 13,984 buah
Rp 10,625 buah
Rp 9,250 buah
Rp 8,375 buah
Rp 6,000 liter
Rp 27,500 kg
Rp 12,000 liter
Rp 28,600 kg

Rp 15,000 m'
Rp 3,821,000 buah
Rp 1,210,000 unit
Rp 950,000 unit
Rp 27,650 set
Rp 2,500,000 buah
Rp 1,640,000 unit
Rp 3,000 m2
Rp 880,000 unit
Rp 35,000 unit
Rp 580,000 unit
Rp 850,000 unit
Rp 850,000 unit
Rp 8,000,000 unit
Rp 385,000 m
Rp 16,325,000 set
Rp 3,500,000 unit
Rp 15,000,000 unit
Rp 1,500,000 ls
Rp 6,000 liter
Rp 4,492 m
Rp 1,050,500 buah
Rp 220,000 buah
Rp 818,400 buah
Rp 2,746,000 buah
Rp 5,235,000 unit
Rp 500,000 bulan
Rp 120,000 unit
Rp 896,000 buah
Rp 15,000 buah
Rp 150,000 buah
Rp 70,500 buah
Rp 20,000 buah

Rp 319,000 m'
Rp 386,000 m'
Rp 198,000 m'
Rp 418,000 m'
Rp 240,000 m'
Rp 950,000 m'
Rp 468,000 m'
Rp 719,000 m'
Rp 947,000 m'
Rp 1,549,000 m'
Rp 2,044,000 m'
Rp 4,115,000 m'
Rp 5,923,000 m'
Rp 6,049,000 m'
Rp 1,200,000 m'

Rp 88,300 m'
Rp 56,600 m'
Rp 72,500 m'
Rp 105,600 m'

Rp 9,180 btg
Rp 12,150 btg
Rp 15 btg
Rp 840 btg
Rp 24,750 btg
Rp 29,880 btg
Rp 40,320 btg
Rp 56,250 btg
Rp 78,120 btg
Rp 136,620 btg
Rp 207,000 btg
Rp 274,500 btg

Rp 859,950 buah
Rp 323,700 buah
Rp 30,000 buah
Rp 150,000 buah

Rp 6,100 m2

Rp 7,500 m2
Rp 11,000 m2
Rp 5,000 m2
Rp 11,700 m2
Rp 7,800 m2

Rp 20,000 Pot
Rp 20,000 Pot
Rp 25,000 Pot
Rp 5,600 Pot
Rp 12,770 Pot
Rp 12,800 Pot
Rp 6,800 Pot
Rp 5,800 Pot
Rp 5,800 Pot
Rp 6,500 Pot
Rp 5,600 Pot
Rp 3,200 Pot
Rp 3,200 Pot
Rp 25,000 Pot

Rp 524,200 m3
Rp 544,200 m3
Rp 564,200 m3
Rp 584,200 m3
Rp 557,200 m3
Rp 577,200 m3
Rp 597,200 m3
Rp 617,200 m3
Rp 585,200 m3
Rp 605,200 m3
Rp 625,200 m3
Rp 645,200 m3
Rp 612,200 m3
Rp 632,200 m3
Rp 652,200 m3
Rp 672,200 m3
Rp 659,200 m3
Rp 684,200 m3
Rp 709,200 m3
Rp 734,200 m3
Rp 670,200 m3
Rp 695,200 m3
Rp 720,200 m3
Rp 745,200 m3
Rp 692,200 m3
Rp 717,200 m3
Rp 742,200 m3
Rp 767,200 m3

Rp 60,000,000 batang
Rp 63,000,000 batang
Rp 68,000,000 batang
Rp 71,000,000 batang
Rp 76,000,000 batang
Rp 84,000,000 batang
Rp 87,000,000 batang
Rp 91,000,000 batang
Rp 95,000,000 batang
Rp 100,000,000 batang
Rp 133,000,000 batang
Rp 137,000,000 batang
Rp 142,000,000 batang
Rp 148,000,000 batang
Rp 153,000,000 batang
Rp 159,000,000 batang
Rp 163,000,000 batang
Rp 176,000,000 batang
Rp 221,000,000 batang
Rp 227,000,000 batang
Rp 235,000,000 batang
Rp 243,000,000 batang
Rp 250,000,000 batang
Rp 273,000,000 batang
Rp 284,000,000 batang
Rp 292,000,000 batang
Rp 301,000,000 batang
Rp 311,000,000 batang
Rp 318,000,000 batang

Rp 2,200,000 buah
Rp 3,400,000 buah
Rp 3,500,000 buah
Rp 3,500,000 buah
Rp 4,000,000 buah

Rp 567,000 buah
Rp 819,000 buah
Rp 1,215,000 buah
Rp 2,640,000 buah
Rp 720,000 buah
Rp 2,250,000 buah
ANALISA HARGA SATUAN S.N.I

NO.

A
I
ANALISA 001

ANALISA 002

ANALISA 003
ANALISA 004

ANALISA 005

ANALISA 006
ANALISA 007

ANALISA 008

ANALISA 009

ANALISA 010
ANALISA 011

ANALISA 012

ANALISA 013

ANALISA 014

II
ANALISA 015
ANALISA 016

ANALISA 017

ANALISA 018

ANALISA 019

ANALISA 020

ANALISA 021

ANALISA 022
ANALISA 023

ANALISA 024

ANALISA 025

ANALISA 026

III
ANALISA 027
ANALISA 028

ANALISA 029

IV
ANALISA 030

ANALISA 031
ANALISA 032

ANALISA 033

V
ANALISA 032

ANALISA 033
ANALISA 034

ANALISA 035

ANALISA 036

ANALISA 037
ANALISA 038

ANALISA 039

ANALISA 040

ANALISA 041
ANALISA 042

7.29

ANALISA 043

ANALISA 044

ANALISA 045

ANALISA 046
ANALISA 047

ANALISA 048

ANALISA 049

ANALISA 050
ANALISA 051

ANALISA 052

ANALISA 053

ANALISA 054

ANALISA 055
ANALISA 056

ANALISA 057

ANALISA 058

ANALISA 059
ANALISA 060

ANALISA 061

ANALISA 062

ANALISA 063
III
V
VII
IX
VII
VI
VI
VI
URAIAN

B
PEKERJAAN PERSIAPAN
1 m' Pagar Sementara dari Kayu tinggi 2 m
Bahan
Dolken Kayu Ø 8 - 10/400 cm
Semen Portland
Pasir Beton
Koral Beton
Kaso 5 / 7 ( albasiah )
Paku Biasa 2" - 5"
Residu
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m


Bahan
Dolken Kayu Ø 8 - 10/400 cm
Semen Holcim 50 Kg
Pasir Beton
Koral Beton
Kaso 5 / 7 ( albasiah )
Paku Biasa 2" - 5"
Meni Besi
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m


Bahan
Dolken Kayu Ø 8 - 10/400 cm
Semen Portland
Kawat Duri
Pasir Beton
Koral Beton
Paku Biasa 2" - 5"
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank


Bahan
Kayu Kaso 5 / 7 (borneo)
Paku Biasa 2" - 5"
Kayu Papan 3 / 20 borneo
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

1 m² Pek. Kantor Direksi Keet , dengan lantai plesteran


Bahan
Dolken Kayu Ø 8 - 10/400 cm
Kayu Balok Borneo
Paku
Besi Strip
Semen Portland
Pasir Pasang
Pasir Beton
Koral Beton
Bata merah kelas I
Seng Plat
Jendela Nako
Kaca Polos
Kunci Tanam
Plywood 4 mm
Tenaga
Tukang Kayu
Tukang Batu
Perkerja
Kepala Tukang
Mandor

1 m² Pembuatan Gudang Semen dan Alat - alat


Bahan
Dolken Kayu Ø 8 - 10/400 cm
Kayu Balok Borneo
Paku
Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang BJLS 32
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

1 m² Pembuatan Rumah Jaga / Konstruksi Kayu


Bahan
Dolken Kayu Ø 8 - 10/400 cm
Kayu Balok Borneo
Paku
Seng Gelombang BJLS 32
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

Membersihkan Lapangan dan Perataan


Tenaga
Perkerja
Mandor

1 m² Pembuatan Bedeng Buruh


Bahan
Dolken Kayu Ø 8 - 10/400 cm
Kayu Balok Borneo
Paku
Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang BJLS 32
Plywood 4 mm
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

1 m² Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm


Bahan
Kayu Terentang
Paku
Kayu Kaso 5 / 7 (borneo)
Tenaga
Tukang Kayu
Mandor

1 m² Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm


Bahan
Bambu Ø 6 - 8 / 600 cm
Tali Ijuk
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

1 m² Pembuatan Jalan Sementara


Bahan
Batu Belah 5 / 20
Batu Belah 5 / 7
Pasir Pasang
Tenaga
Perkerja
Mandor

1 m³ Bongkaran Beton Bertulang


Tenaga
Perkerja
Mandor

1 m³ Bongkaran Dinding Tembok Bata Merah


Tenaga
Perkerja
Mandor

PEKERJAAN TANAH
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

1 m3 Pek. Galian Tanah Biasa Max Kedalaman 3 m'


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

1 m3 Pek. Galian Tanah Keras Max Kedalaman 1 m'


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

1 m3 Pek. Galian Tanah Cadas Max Kedalaman 1 m'


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

1 m3 Pek. Galian Tanah Lumpur Max Kedalaman 1 m'


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

1 m² Pek. Stripping 1 m
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

1 m³ Pembuangan Tanah sejauh 150 m


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

1 m3 Urugan Tanah Kembali


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

1 m3 Pemadatan tanah
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

1 m3 Pek. Urugan Pasir


Bahan
Pasir Urug
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

1 m3 Pemasangan Lapisan ijuk


Bahan
Ijuk
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

PEKERJAAN PONDASI
1 m' Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulang
Bahan
Pasir Urug Darat
Pasir Beton
Koral Beton
Semen Portland
Besi Beton
Kawat Beton
Kayu Kaso 5 / 7 (borneo)
Paku
Minyak Bekisting
Plamuur Tembok
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m3 Pasangan Batu kali 1 Pc : 3Ps


Bahan
Batu Belah 15 / 20
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m3 Pasangan Batu kali 1 Pc : 5Ps


Bahan
Batu Belah 15 / 20
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

PEKERJAAN DINDING
1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pasangan Bata Merah 1Pc : 5Ps 1 Bata


Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata


Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pasangan Bata Merah 1Pc : 5Ps 1/2 Bata


Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

PEKERJAAN PELESTERAN
1 m2 Plesteran Dinding 1Pc : 3Ps
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran Dinding 1Pc : 5Ps


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran Dinding 1Pc : 0. 5Kp : 3 Ps, tebal 15 mm


Bahan
Semen Portland
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran Dinding 1Pc : 3Kp : 10Ps, tebal 15 mm


Bahan
Semen Portland
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 0.5Pc : 1Kp : 4Ps, tebal 15 mm


Bahan
Semen Portland
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Kp : 1 Sm : 1Ps, tebal 15 mm


Bahan
Semen Merah
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm


Bahan
Semen Merah
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 2 Ps, tebal 20 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 3 Ps, tebal 20 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 4Ps, tebal 20 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 5Ps, tebal 20 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 6Ps, tebal 20 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm


Bahan
Semen Merah
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 2Ps, tebal 25 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 3Ps, tebal 25 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 4Ps, tebal 25 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 5Ps, tebal 25 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 2Ps, tebal 30 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 3Ps, tebal 30 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 4Ps, tebal 30 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran 1Pc : 5Ps, tebal 30 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Berapen 1Pc : 3Ps, tebal 30 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Berapen 1Pc : 5Ps, tebal 15 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pelesteran Beton 1Pc : 2Ps, tebal 15 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pelesteran Beton 1Pc : 3Ps, tebal 15 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pelesteran Skoring 1Pc : 2Ps


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pelesteran Granito 1Pc Warna : 2 Granito, tebal 10 mm


Bahan
PC Warna
Batu Granito
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pelesteran Teraso 1Pc Warna : 2 Batu Teraso, tebal 10 mm


Bahan
PC Warna
Batu Teraso
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pelesteran Ciprat 1 Pc : 2 Ps
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pelesteran Siar Adukan 1 Pc : 2 Ps


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pelesteran Waterfroof Batacote 3 lapis


Bahan
Semen Portland
Batacote
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Plesteran Dinding 1 : 3 + ACIAN


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran Dinding 1 : 5 + ACIAN
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

PEKERJAAN KAYU
1m³ Pasang Kusen Pintu dan Jendela Kayu Jati
Bahan
Kayu Balok Jati
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m³ Pasang Kusen Pintu dan Jendela Kayu Borneo


Bahan
Kayu Balok Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m³ Pasang Kusen Pintu dan Jendela Kayu Damar Laut


Bahan
Kayu Balok Damar Laut
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Klamp Kayu Kamper


Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Klamp Kayu Borneo


Bahan
Papan Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Panel Kayu Jati


Bahan
Papan Kayu Jati
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Panel Kayu Kamper


Bahan
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu dan Jendela Kaca Kayu Jati


Bahan
Papan Kayu Jati
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu dan Jendela Kaca Kayu Kamper


Bahan
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu dan Jendela Kaca Kayu Borneo


Bahan
Papan Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu dan Jendela Jalusi Kayu Borneo


Bahan
Papan Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu dan Jendela Jalusi Kayu Kamper


Bahan
Papan Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Plywood rangkap, rangka kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Plywood rangkap, rangka kayu Kamper


Bahan
Papan Kayu Jati
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Jalusi Mati Kusen Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa ½" - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Jalusi Mati Kusen Kayu Kamper


Bahan
Papan Kayu Jati
Paku Biasa ½" - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Plywood Rangkap, rangka Kayu Borneo


Bahan
Papan Kayu Borneo
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper


Bahan
Papan Kayu Jati
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Plywood & Formika, rangka Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Plywood & Formika, rangka Kayu Kamper


Bahan
Papan Kayu Kamper
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Teakwood & Formika, rangka Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Teakwood & Formika, rangka Kayu Kamper ( divernis )
Bahan
Papan Kayu Jati
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Formika Double, rangka Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Pintu Formika Double, rangka Kayu Kamper


Bahan
Papan Kayu Kamper
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m3 Pasang Konstruksi Kuda - kuda Kayu Jati


Bahan
Balok Kayu Jati
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m3 Pasang Konstruksi Kuda - kuda Kayu Kamper


Bahan
Balok Kayu Kamper
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m3 Pasang Konstruksi Kuda - kuda Kayu Borneo


Bahan
Balok Kayu Borneo
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m3 Pasang Konstruksi Kuda - kuda Kayu Kruing


Bahan
Balok Kayu Kruing
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Kaso + Reng Genteng Kodok Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Kaso + Reng Genteng Kodok Kayu Borneo


Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Kaso + Reng Genteng Monier Kayu Jati


Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Kaso + Reng Genteng Monier Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Kaso + Reng Genteng Beton Kayu Borneo


Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Kaso + Reng Atap Sirap Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Kaso + Reng Atap Sirap Kayu Borneo


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Jati


Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang papan ruiter ( 3 x 20 )cm Kayu Borneo


Bahan
Kayu Papan 3 / 20 borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Borneo


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Jati


Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo


Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati


Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo


Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Lisplank ( 3 x 20 )cm Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Lisplank ( 3 x 20 )cm Kayu Kamper


Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Lisplank ( 3 x 30 )cm Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Lisplank ( 3 x 30 )cm Kayu Kamper


Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Lisplank 2 x( 3 x 20 )cm Kayu Kamper


Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Kamper


Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Borneo


Bahan
Papan Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Rangka Dinding Pemisah Kayu Kamper


Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Rangka Dinding Pemisah Kayu Borneo


Bahan
Balok Kayu Borneo
Papan Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m² Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper
Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper


Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper


Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Dinding Lambriziring dari papan Kayu jati


Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m² Pasang Plywood tebal 4mm, untuk dinding
Bahan
Plywood 4 mm
Paku Biasa ½" - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang List Plafond Kayu Profil


Bahan
Kayu Profil
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Tumbuk 1 Pc : 3 Ps : 5 Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Tumbuk 1 Pc : 3 Ps : 6 Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Tumbuk 1 Pc : 4 Ps : 6 Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton 1 Pc : 2 Ps : 3 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Bertulang 1 Pc : 2 Ps : 4 Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Bertulang 1 Pc : 2 Ps : 2.5 Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Bertulang 1 Pc : 1 Ps : 2Kr


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Tiang Pancang Prestressed Beton


Bahan
Semen Portland
Pasir Beton
Koral Beton
Rapidrant
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 4 Splt


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Bertulang 1 Pc : 1.5Ps : 3 Splt


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Bertulang 1 Pc : 1.5Ps : 2.5 Splt


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Bertulang 1 Pc : 1Ps : 1Splt


Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m³ Membuat Beton Kedap Air dengan Strorox - 100


Bahan
Semen Portland
Pasir Beton
Koral Beton
Strorox - 100
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m' Memasang PVC Waterstop lebar 150 mm


Bahan
Waterstop lebar 150 mm
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m' Memasang PVC Waterstop lebar 200 mm


Bahan
Waterstop lebar 200 mm
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m' Memasang PVC Waterstop lebar 230 mm


Bahan
Waterstop lebar 230 mm
Tenaga
Perkerja
Tukang Batu
Mandor

1 m' Memasang PVC Waterstop lebar 250 mm


Bahan
Waterstop lebar 250 mm
Tenaga
Perkerja
Tukang Batu
Mandor

1 m' Memasang PVC Waterstop lebar 300 mm


Bahan
Waterstop lebar 300 mm
Tenaga
Perkerja
Tukang Batu
Mandor

1 m' Memasang PVC Waterstop lebar 320 mm


Bahan
Waterstop lebar 320 mm
Tenaga
Perkerja
Tukang Batu
Mandor

1 Kg Pembesian dengan Besi Polos atau Besi Ulir


Bahan
Besi Beton ( Polos / Ulir )
Kawat Beton
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor
1 Kg Kabel Presstressed Polos / Strands
Bahan
Besi Beton ( Polos / Ulir )
Kawat Beton
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor

1 Kg Jaring Kawat Baja


Bahan
Besi Jaring Kawat Baja
Kawat Beton
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor

1 m2 Pasang Bekisting
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Plywood 9 mm
Dolken Kayu Galam Ø 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m2 Pasangan Stoot Werk


Bahan
Kayu Kaso 5 / 7 (borneo)
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m2 Pasang Bekisting untuk Pondasi


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m2 Pasang Bekisting untuk Sloof


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m2 Pasang Bekisting untuk Kolom


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam Ø 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m2 Pasang Bekisting untuk Balok


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam Ø 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m2 Pasang Bekisting untuk Lantai


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam Ø 8 - 10 / 4m
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 Pasang Bekisting untuk Dinding


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam Ø 8 - 10 / 4m
Formtie / penjaga jarak bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m2 Pasang Bekisting untuk Tangga


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam Ø 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m³ Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1 m³ Membuat Sloof Beton Bertulang ( 200 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1 m³ Membuat Kolom Beton Bertulang ( 300 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken Ø 8 / 4 m
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1 m³ Membuat Balok Beton Bertulang ( 200 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken Ø 8 / 4 m
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1 m³ Membuat Balok Beton Bertulang ( 150 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken Ø 8 / 4 m
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1 m³ Membuat Dinding Beton Bertulang ( 150 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken Ø 8 / 4 m
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1 m³ Membuat Tangga Beton Bertulang ( 200 Kg + bekisting )


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken Ø 8 / 4 m
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1 m³ Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1 m³ Membuat Ring Balok Beton Bertulang (10 x 15) cm


Bahan
Kayu Albasiah
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

PEKERJAAN PENTUP ATAP


1m² Pasang Atap Genteng Palentong Kecil
Bahan
Genteng Palentong
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Genteng Kodok / Glazzur


Bahan
Genteng Kodok
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Genteng Palentong Super / Besar


Bahan
Genteng Palentong Super
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Genteng Bubung Palentong


Bahan
Genteng Bubung Palentong
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Genteng Bubung Kodok Glazzur


Bahan
Genteng Bubung Kodok
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Genteng Bubung Palentong Besar


Bahan
Genteng Bubung Palentong
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm


Bahan
Roof Light Fiberglass
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Bubung Stel Gelombang 0.92m


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Stel Gelombang 0.92m


Bahan
Asbes Gelombang
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Stel Gelombang 1.05m


Bahan
Asbes Gelombang
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Stel Gelombang 1.08m


Bahan
Asbes Gelombang
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Paten 0.92m


Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Paten 1.05m


Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Paten 1.08m


Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Stel rata 0.92m


Bahan
Nok Stel rata
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Stel rata 1.05m


Bahan
Nok Stel rata
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Genteng Beton


Bahan
Genteng Beton
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Genteng Aspal


Bahan
Genteng Aspal
Plywood 4 mm
Paku Biasa 1/2" - 1"
Plastic Aerator
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Genteng Metal


Bahan
Genteng Metal
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Sirap


Bahan
Genteng Sirap
Paku Biasa ½" - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Genteng Beton


Bahan
Genteng Beton
Paku Biasa 2" - 5"
Semen abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Genteng Aspal


Bahan
Genteng Aspal
Paku Biasa ½" - 1"
Balok Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Genteng Metal


Bahan
Genteng Decra Bond
Paku Biasa ½" - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Genteng Metal


Bahan
Genteng Decra Bond
Paku Biasa ½" - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Nok Sirap


Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa ½" - 1"
Paku Biasa 2" - 5"
Papan Kayu Borneo tebal 3cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Seng Gelombang


Bahan
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa ½" - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m² Pasang Atap Nok Seng
Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa ½" - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Atap Alluminium


Bahan
Atap Alluminium Gelombang tebal 0.55
Paku Hak Pnjang 15 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Nok Alluminium


Bahan
Nok standar 40 cm 18, swg 22
Paku Hak Pnjang 15 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m² Pasang Alluminium Foil / Sisalation


Bahan
Sisalation / Alluminium Foil
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN LANGIT - LANGIT


1 m2 Pas. Rangka Plapond Kayu Kls I (Hanya Rangka)
Bahan
Kayu Balok Borneo
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 5 mm


Bahan
Pelat Asbes tebal 5 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 4 mm


Bahan
Pelat Asbes tebal 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 3.5 mm


Bahan
Pelat Asbes tebal 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Akustik ( 30 x 30 )cm


Bahan
Akustik 30 x 30 cm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m² Langit - langit Akustik ( 30 x 60 )cm
Bahan
Akustik 30 x 60 cm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Akustik ( 60 x 120 )cm


Bahan
Akustik Arm Strong Ukuran 30 x 120 cm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Plywood ( 30 x 60 )cm, tebal 4 mm


Bahan
Plywood 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Plywood ( 30 x 60 )cm, tebal 6 mm


Bahan
Plywood 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Plywood ( 60 x 120 )cm, tebal 4 mm


Bahan
Plywood 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Plywood ( 60 x 120 )cm, tebal 6 mm


Bahan
Plywood 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Teakwood ( 30 x 60 )cm, tebal 4 mm


Bahan
Teakwood 4' x 8' x 4mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Teakwood ( 60 x 120 )cm, tebal 4 mm


Bahan
Teakwood 4' x 8' x 4mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Gypsum


Bahan
Gypsum
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m² Langit - langit Kayu Jati
Bahan
Papan Kayu Jati
Paku
Paku Sekrup
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Kayu Ramin


Bahan
Papan Kayu Ramin
Paku
Paku Sekrup
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Kayu Kamper


Bahan
Papan Kayu Kamper
Paku
Paku Sekrup
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Softboard


Bahan
Softboard 4' x 8' x 4mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Akustik 60 x 120 cm + rangka Alluminium


Bahan
Profil Alluminium " T "
Kawat seng polos
Ramset / Dinabolt
Akustik Armstrom 60 x 120cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² List Langit - langit Kayu Profil


Bahan
List Kayu Profil
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Plywood 4 mm + RangkaKayu Borneo


Bahan
Balok Kayu Borneo
Paku
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo
Bahan
Balok Kayu Borneo
Paku
Asbes
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Akustik ( 30 x 60 )cm + Rangka Kayu Borneo


Bahan
Balok Kayu Borneo
Paku
Akustik 30 x 60 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Langit - langit Akustik ( 30 x 30 )cm + Rangka Kayu Borneo


Bahan
Balok Kayu Borneo
Paku
Akustik 30 x 30 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok
Bahan
Kloset Duduk / Monoblok
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 buah Kloset Jongkok Porselen


Bahan
Kloset Jongkok Porselen
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 buah Kloset Jongkok Teraso


Bahan
Kloset Jongkok Teraso
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 buah Urinoir


Bahan
Urinoir
Perlengkapan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 buah Wastafel


Bahan
Urinoir
Perlengkapan
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 buah Bak Mandi Teraso, volume 0.30 m³


Bahan
Bak Teraso
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m³


Bahan
Bak Fiberglass
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m³


Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Porselen ( 11 x 11 ) cm
Semen Nat
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 buah Badkip Porselen


Bahan
Badkip
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 buah Bak Fiberglass volume 1 m³ air


Bahan
Bak Fiberglass
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm
Bahan
Pipa Tanah
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm


Bahan
Pipa Tanah
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa Beton Ø 5 cm - 20 cm


Bahan
Pipa Beton
Bata merah kelas I
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa Beton Ø 30 cm - 100 cm


Bahan
Pipa Beton
Bata merah kelas I
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Batu Kerikil
Besi Beton
Pasir Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Batu Kerikil
Besi Beton
Pasir Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Batu Koral
Besi Beton
Pasir Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tukang Gali
Memasang 1 m' Pipa Galvanis Ø ½"
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa Galvanis Ø ¾"


Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa Galvanis Ø 1"


Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa Galvanis Ø 1½"


Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa Galvanis Ø 3"


Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa Galvanis Ø 4"


Bahan
Pipa Galvanis D 4"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa PVC tipe AW Ø ½"


Bahan
Pipa PVC D 1/2"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa PVC tipe AW Ø ¾"


Bahan
Pipa PVC tipe AW Ø ¾"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa PVC tipe AW Ø 1"


Bahan
Pipa PVC tipe AW Ø 1"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa PVC tipe AW Ø 1½"
Bahan
Pipa PVC tipe AW Ø 1½"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa PVC tipe AW Ø 2"


Bahan
Pipa PVC tipe AW Ø 2"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa PVC tipe AW Ø 2½"


Bahan
Pipa PVC tipe AW Ø 2½"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa PVC tipe AW Ø 3"


Bahan
Pipa PVC tipe AW Ø 3"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa PVC tipe AW Ø 4"


Bahan
Pipa PVC tipe AW Ø 4"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 bh Bak Cuci Piring Stainles Steel


Bahan
Bak cuci Stainless steel
Water Drain + Asesories
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 bh Bak Cuci Piring Teraso


Bahan
Bak cuci Teraso
Water Drain + Asesories
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 bh Kran Ø ¾" atau ½"


Bahan
Kran Air
Seal tape
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 bh Floor Drain


Bahan
Kran Air
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

PEKERJAAN BESI DAN ALLUMINIUM


1 Kg Pasang Rangka Atap Baja
Bahan
Besi Profil WF
Meni Besi
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor

1 m² Pasang Pintu Besi Baja


Bahan
Pintu Besi Baja
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

1 m² Pasang Jendela Besi


Bahan
Jendela Besi
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

1 m² Pasang Jendela Besi Tahan Api


Bahan
Jendela Besi Tahan Api
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

1 m² Pasang Pintu gulung besi


Bahan
Pintu gulung besi
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

1 m² Pasang Pintu Lipat


Bahan
Pintu Lipat
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

1 m² Pasang Pintu Suncreen Allumunium


Bahan
Suncreen Allumunium
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

1 m² Pasang Rolling Door


Bahan
Rolling Door
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

1 m² Pasang Pintu Allumunium


Bahan
Pintu Allumunium
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

1 m² Pasang Venetions Blinds


Bahan
Venetions Blinds
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Pasang Vertikals Blinds


Bahan
Venetions Blinds
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Pasang Terali Besi


Bahan
Terali Besi 2 x 3
Tenaga
Perkerja
Tukang Las
Kepala Tukang
Mandor

1 m² Pasang Kawat Harmonika


Bahan
Kawat Harmonika
Paku Biasa ½" - 1"
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Pasang Kawat Nyamuk


Bahan
Kawat Nyamuk
Paku Biasa ½" - 1"
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m² Pasang Kawat Kassa
Bahan
Kawat Kassa
Paku Biasa ½" - 1"
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Pasang Kawat Burung


Bahan
Kawat Burung
Paku Biasa ½" - 1"
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Pasang Jendela Nako & Tralis


Bahan
Jendela Nako
Paku Biasa ½" - 1" atau Sekrup
Besi Strip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Pasang Talang Datar , Seng BJLS 28


Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa ½" - 1" atau Sekrup
Papan Kayu Borneo
Flincote / Meni Besi
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m² Pasang Talang Miring , Seng BJLS 28
Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa ½" - 1" atau Sekrup
Papan Kayu Borneo
Flincote / Meni Besi
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Pasang Talang ½ Lingkaran Ø 10 cm, Seng BJLS 28


Bahan
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa ½" - 1" atau Sekrup
Papan Kayu Borneo
Besi Strip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m² Pasang Talang ½ Lingkaran Ø 10 cm, Seng BJLS 24


Bahan
Seng Plat 3 x 6 BJLS 24
Paku Biasa ½" - 1" atau Sekrup
Papan Kayu Borneo
Besi Strip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN KUNCI DAN KACA


1 Buah Pasang Kunsi Tanam Antik
Bahan
Kunsi Tanam Antik
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunsi Tanam Biasa
Bahan
Kunsi Tanam Biasa
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kunsi Tanam Kamar Mandi


Bahan
Kunsi Tanam Kamar Mandi
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kunsi Silinder


Bahan
Kunsi Silinder
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Engsel Pintu


Bahan
Engsel Pintu
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Engsel Jendela Kupu - kupu


Bahan
Engsel Jendela
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Engsel Angin
Bahan
Engsel Angin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Spring Knip


Bahan
Spring Knip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kait angin


Bahan
Kait Angin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Door Closer


Bahan
Door Closer
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kunci Selot


Bahan
Kunci Selot
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Pegangan Pintu / Door Holder
Bahan
Door Holder
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Door Stop


Bahan
Door Stop
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Rel Pintu Dorong


Bahan
Rel Pintu Dorong
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kunci Lemari


Bahan
Kunci Lemari
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kaca tebal 3 mm


Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca tebal 5 mm
Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kaca tebal 8 mm


Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kaca Buram tebal 12 mm


Bahan
Kaca Buram
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kaca Cermin tebal 5 mm


Bahan
Kaca Cermin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kaca Cermin tebal 6 mm


Bahan
Kaca Cermin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Cermin tebal 8 mm
Bahan
Kaca Cermin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kaca Wireglass tebal 5 mm


Bahan
Kaca Wireglass
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kaca Patri tebal 5 mm


Bahan
Kaca Patri
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN PENUTUP LANTAI DAN DINDING


1 m² Pasang Lantai Ubin PC Abu - abu ukuran 40 x 40 cm
Bahan
Ubin Abu -abu 40 x40 cm
Semen Portland
Pasir Pasang

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin PC Abu - abu ukuran 30 x 30 cm


Bahan
Ubin Abu -abu 30 x 30 cm
Semen Portland
Pasir Pasang

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin PC Abu - abu ukuran 20 x 20 cm


Bahan
Ubin Abu -abu 20 x 20 cm
Semen Portland
Pasir Pasang

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin Warna ukuran 40 x 40 cm


Bahan
Ubin Warna 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin Warna ukuran 30 x 30 cm


Bahan
Ubin Warna 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m² Pasang Lantai Ubin Warna ukuran 20 x 20 cm
Bahan
Ubin Warna 20 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin Teraso ukuran 40 x 40 cm


Bahan
Ubin Teraso 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin Teraso ukuran 30 x 30 cm


Bahan
Ubin Teraso 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin Granito ukuran 40 x 40 cm


Bahan
Ubin Granito 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin Granito ukuran 30 x 30 cm


Bahan
Ubin Granito 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin Teralux Kerang ukuran 40 x 40 cm


Bahan
Ubin Teralux Kerang 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin Teralux Kerang ukuran 30 x 30 cm


Bahan
Ubin Teralux Kerang 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin Teralux Marmer ukuran 60 x 60 cm


Bahan
Ubin Teralux Marmer 60 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin Teralux Marmer ukuran 40 x 40 cm


Bahan
Ubin Teralux Marmer 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Ubin Teralux Marmer ukuran 30 x 30 cm


Bahan
Ubin Teralux Marmer 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin PC Abu - abu ukuran 15 x 20 cm


Bahan
Plint Ubin PC Abu - abu 15 x 20 cm
Semen Portland
Pasir Pasang

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin PC Abu - abu ukuran 10 x 30 cm


Bahan
Plint Ubin PC Abu -abu 10 x 30 cm
Semen Portland
Pasir Pasang

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin PC Abu - abu ukuran 10 x 40 cm


Bahan
Plint Ubin PC Abu - abu 10 x 40 cm
Semen Portland
Pasir Pasang

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin PC Warna ukuran 10 x 20 cm


Bahan
Plint Ubin PC Warna 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m² Pasang Plint Ubin PC Warna ukuran 10 x 30 cm
Bahan
Plint Ubin PC Warna 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin PC Warna ukuran 10 x 40 cm


Bahan
Plint Ubin PC Warna 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin Teraso ukuran 10 x 30 cm


Bahan
Plint Ubin Teraso 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin Teraso ukuran 10 x 40 cm


Bahan
Plint Ubin Teraso 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin Granito ukuran 10 x 40 cm


Bahan
Plint Ubin Granito 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin Granito ukuran 10 x 30 cm


Bahan
Plint Ubin Granito 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin Teralux Kerang ukuran 10 x 40 cm


Bahan
Plint Ubin Teralux Kerang 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m² Pasang Plint Ubin Teralux Kerang ukuran 10 x 30 cm
Bahan
Plint Ubin Teralux Kerang 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 60 cm


Bahan
Plint Ubin Teralux Marmer 10 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 40 cm


Bahan
Plint Ubin Teralux Marmer 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 30 cm


Bahan
Plint Ubin Teralux Marmer 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Teraso Cor ditempat


Bahan
Bahan Teraso Cor

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Teralux Cor ditempat, tebal 3 cm


Bahan
Bahan Teraso Cor

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Ubin Tahan Asam


Bahan
Ubin Tahan Asam
Semen Tanam Asam
Pasir Pasang

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Keramik Artistik 10 x 20 cm


Bahan
Ubin Keramik Artistik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m' Pasang Plint Keramik Artistik ukuran 10 x 20 cm


Bahan
Plint Keramik Artistik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m' Pasang Plint Keramik Artistik ukuran 10 x 10 cm


Bahan
Plint Keramik Artistik 10 x 10 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m' Pasang Plint Keramik Artistik ukuran 5 x 20 cm


Bahan
Plint Keramik Artistik 5 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m' Pasang Plint Vinyl tanpa adukan


Bahan
Lt. Vinyl Karet 30 x 30 kwl I
Lem Vinyl

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Keramik 10 x 20 cm


Bahan
Ubin Keramik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Keramik 15 x 15 cm


Bahan
Ubin Keramik 15 x 15 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Keramik 20 x 20 cm


Bahan
Ubin Keramik 20 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Keramik 25 x 25 cm


Bahan
Ubin Keramik 25 x 25 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Keramik 15 x 20 cm


Bahan
Ubin Keramik 15 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Keramik 33 x 33 cm


Bahan
Ubin Keramik 33 x 33 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Keramik 33 x 33 cm anti slip


Bahan
Ubin Keramik 33 x 33 cm anti slip
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Keramik 10 x 33 cm


Bahan
Ubin Keramik 10 x 33 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Mozaik 30 x 30 cm, ex lokal


Bahan
Mozaik 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Marmer


Bahan
Marmer
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Karpet 100% Wool


Bahan
Feltex 100% Wool - T - 21
Lem Vinyl

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Karpet 100% Wool, 20% Nylon


Bahan
Carpet 80% Wool, 20% Nylon
Lem Vinyl

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Underlyer, tebal 6 mm


Bahan
Underlyer, tebal 6 mm / Rubber Corrugated

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Karpet


Bahan
Carpet
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Parquet Jati


Bahan
Parquet Jati
Lem Vinyl

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Porselen 11 x 11 cm, putih


Bahan
Porselen 11 x 11 cm putih
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Porselen 11 x 11 cm, warna


Bahan
Porselen 11 x 11 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Porselen 15 x 15 cm, putih


Bahan
Porselen 15 x 15 cm putih
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Porselen 15 x 15 cm, warna


Bahan
Porselen 15 x 15 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Porselen 10 x 20 cm, warna


Bahan
Porselen 10 x 20 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Porselen 20 x 20 cm, warna


Bahan
Porselen 20 x 20 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m² Pasang Dinding Keramik Artistik 10 x 20 cm, warna
Bahan
Keramik Artistik 10 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Keramik Artistik 5 x 20 cm, warna


Bahan
Keramik Artistik 5 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Keramik 10 x 20 cm


Bahan
Keramik 10 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Keramik 15 x 15 cm


Bahan
Keramik 15 x 15 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Keramik 20 x 20 cm


Bahan
Keramik 20 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Keramik 10 x 20 cm


Bahan
Keramik 10 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Marmer


Bahan
Marmer
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Bata Klinker 5 x 5 x 24 cm


Bahan
Bata Pelapis Klinker
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Batu Paros


Bahan
Batu Paros
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Dinding Batu Tempel Hitam


Bahan
Batu Tempel Hitam
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Vinyl Karet 30 x 30 cm KL I


Bahan
Vinyl Karet 30 x 30 cm KL I
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Vinyl Karet 30 x 30 cm KL II


Bahan
Vinyl Karet 30 x 30 cm KL II
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Vinyl Asbes 30 x 30 cm


Bahan
Vinyl Asbes 30 x 30 cm
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Lantai Vinyl Motif Kembang 30 x 30 cm


Bahan
Vinyl Motif Kembang ex DN
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Pasang Wall Covering lebar 50 cm


Bahan
Vinyl Wall Covering lebar 50 cm
Lem
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Floor Hardener Ferrovax


Bahan
Floor Hardener Ferrovax
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Floor Hardener Mastercron


Bahan
Floor Hardener Ferrovax
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m² Plint Kayu 2 x 10 cm
Bahan
Papan Kayu Jati
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN PENGECATAN
1 m² Mengikis / Mengerok Permukaan Cat Tembok Lama
Bahan
Soda Api
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Mencuci Bidang Permukaan Tembok yang Pernah dicat


Bahan
Sabun
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual


Bahan
Sabun
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m² Menyabun Permukaan Tembok Lama
Bahan
Sabun
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2½.
Bahan
Pasir Silika
BBM
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Mendempul dan Menggosok Kayu


Bahan
Dempul Jadi
Minyak Cat
Batu Apung
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Mengecatan Bidang Kayu Lama


Bahan
Plamir
Cat Dasar
Cat Penutup
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek

Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek

Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek

Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Pelaburan Bidang Kayu dengan Teak Oil


Bahan
Teak Oil
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m² Pelaburan Bidang Kayu dengan Pelitur
Bahan
Pelitur
Pelitur Jadi
Ampelas
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Pelaburan Bidang Kayu dengan Cat Residu dan Ter


Bahan
Residu atau Ter
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Pelaburan Bidang Kayu dengan Vernis


Bahan
Vernis
Dempul
Ampelas
Kuas
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Bahan
Plamir
Cat Dasar
Cat Tembok vinilex
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Melabur Tembok dengan Kapur Sirih


Bahan
Ampelas
Alang - alang
Perancah Kayu
Kapur Sirih
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan )


Bahan
Perancah Kayu
Kapur Sirih
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Pemasangan Wall Paper


Bahan
Wall Paper
Perekat
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Pengecatan Permukaan Baja dengan Meni Besi


Bahan
Meni Besi
Kuas
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Pengecatan Permukaan Baja dengan Meni Besi dan Perancah


Bahan
Meni Besi
Kuas
Perancah Kayu
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um
Bahan
Meni ( Read Lead ) A
Meni ( Read Lead ) B
Alluminium C
Alluminium B
Pengencer
Perancah Kayu
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um
Bahan
Meni Besi
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um
Bahan
Cat Dasar
Cat Antara
Cat Penutup
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, teb
Bahan
Cat Dasar
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
HARGA SAT HARGA SAT JUMLAH
KOEF SAT JUMLAH upah TOTAL harga
matrial upah matrial
C D E F G=(CXE) H = (C X F ) I=(G+H)

0.00 38,691.56 38,691.56

1.250 btg Rp - Rp -
2.500 Kg Rp - Rp -
0.005 m3 Rp - Rp -
0.009 m3 Rp - Rp -
0.072 m3 Rp - Rp -
0.060 Kg Rp - Rp -
0.400 Lt Rp - Rp -

0.200 Oh Rp 65,734.00 Rp 13,146.80


0.400 Oh Rp 55,798.00 Rp 22,319.20
0.020 Oh Rp 75,671.00 Rp 1,513.42
0.020 Oh Rp 85,607.00 Rp 1,712.14

0.00 38,691.56 38,691.56

1.250 btg Rp - 0.00


2.500 Kg Rp - 0.00
1.200 m3 Rp - 0.00
0.009 m3 Rp - 0.00
0.072 m3 Rp - 0.00
0.060 Kg Rp - 0.00
0.450 Lt Rp - 0.00

0.200 Oh Rp 65,734.00 Rp 13,146.80


0.400 Oh Rp 55,798.00 Rp 22,319.20
0.020 Oh Rp 75,671.00 Rp 1,513.42
0.020 Oh Rp 85,607.00 Rp 1,712.14

0.00 33,111.76 33,111.76

1.000 btg Rp - 0.00


2.000 Kg Rp - 0.00
25.000 Kg Rp - 0.00
0.005 m3 Rp - 0.00
0.009 m3 Rp - 0.00
0.060 Kg Rp - 0.00

0.200 Oh Rp 65,734.00 13,147


0.300 Oh Rp 55,798.00 16,739
0.020 Oh Rp 75,671.00 1,513
0.020 Oh Rp 85,607.00 1,712

0.00 13,337.95 13,337.95

0.012 m3 Rp - 0.00
0.020 Kg Rp - 0.00
0.007 m3 Rp - 0.00

0.100 Oh Rp 65,734.00 6,573


0.100 Oh Rp 55,798.00 5,580
0.010 Oh Rp 75,671.00 757
0.005 Oh Rp 85,607.00 428

0.00 0.00 0.00

1.250 btg Rp - 0.00


0.180 m3 Rp - 0.00
0.850 Kg Rp - 0.00
1.100 Kg Rp - 0.00
35.000 Kg Rp - 0.00
0.150 m3 Rp - 0.00
0.100 m3 Rp - 0.00
0.150 m3 Rp - 0.00
30.000 bh Rp - 0.00
0.250 lbr Rp - 0.00
2.000 bh Rp - 0.00
0.080 m2 Rp - 0.00
0.150 bh Rp - 0.00
0.060 lbr Rp - 0.00

2.000 Oh Rp - -
1.000 Oh Rp - -
2.000 Oh Rp - -
0.300 Oh Rp - -
0.050 Oh Rp - -

0.00 0.00 0.00

1.700 btg Rp - 0.00


0.210 m3 Rp - 0.00
0.300 Kg Rp - 0.00
10.500 Kg Rp - 0.00
0.030 m3 Rp - 0.00
0.050 m3 Rp - 0.00
1.500 lbr Rp - 0.00

2.000 Oh Rp - -
1.000 Oh Rp - -
0.200 Oh Rp - -
0.050 Oh Rp - -

0.00 0.00 0.00

3.000 btg Rp - 0.00


0.276 m3 Rp - 0.00
0.700 Kg Rp - 0.00
1.500 lbr Rp - 0.00

1.500 Oh Rp - -
1.000 Oh Rp - -
0.150 Oh Rp - -
0.050 Oh Rp - -

0.00 #N/A #N/A

0.100 Oh #N/A #N/A


0.050 Oh #N/A #N/A

#N/A #N/A #N/A

1.250 btg #N/A #N/A


0.186 m3 49,500.00 9,207.00
0.300 Kg 49,500.00 14,850.00
18.000 Kg #N/A #N/A
0.030 m3 49,500.00 1,485.00
0.050 m3 #N/A #N/A
1.500 lbr #N/A #N/A
1.350 lbr #N/A #N/A

2.000 Oh #N/A #N/A


1.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.050 Oh #N/A #N/A

#N/A #N/A #N/A


0.186 m3 #N/A #N/A
0.300 Kg 49,500.00 14,850.00
1.000 btg 49,500.00 49,500.00

2.000 Oh #N/A #N/A


0.050 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 btg #N/A #N/A


0.250 Kg #N/A #N/A

2.000 Oh #N/A #N/A


1.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.050 Oh #N/A #N/A

#N/A #N/A #N/A

0.150 m3 #N/A #N/A


0.090 m3 #N/A #N/A
0.010 m3 49,500.00 495.00

1.000 Oh #N/A #N/A


0.050 Oh #N/A #N/A

0.00 #N/A #N/A

6.667 Oh #N/A #N/A


0.333 Oh #N/A #N/A

0.00 #N/A #N/A

6.667 Oh #N/A #N/A


0.033 Oh #N/A #N/A

0.00 #N/A #N/A

0.400 Oh #N/A #N/A


Oh #N/A #N/A
Oh #N/A #N/A
0.040 Oh #N/A #N/A
0.00 #N/A #N/A

0.525 Oh #N/A #N/A


Oh #N/A #N/A
Oh #N/A #N/A
0.052 Oh #N/A #N/A

0.00 #N/A #N/A

0.735 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.073 Oh #N/A #N/A

0.00 #N/A #N/A

0.625 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.062 Oh #N/A #N/A

0.00 #N/A #N/A

1.250 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.125 Oh #N/A #N/A

0.00 #N/A #N/A

0.823 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.083 Oh #N/A #N/A

0.00 #N/A #N/A

0.050 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.005 Oh #N/A #N/A

0.00 #N/A #N/A

0.192 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.050 Oh #N/A #N/A

0.00 #N/A #N/A

0.192 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.019 Oh #N/A #N/A

0.00 #N/A #N/A

0.500 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.050 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m3 #N/A #N/A

0.300 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m3 #N/A #N/A

0.150 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.015 Oh #N/A #N/A

#N/A #N/A #N/A

0.016 m3 #N/A #N/A


0.080 m3 49,500.00 3,960.00
0.125 m3 #N/A #N/A
49.000 Kg #N/A #N/A
34.500 Kg #N/A #N/A
0.700 Kg #N/A #N/A
0.270 m3 49,500.00 13,365.00
0.120 Kg 49,500.00 5,940.00
0.090 lt #N/A #N/A
0.200 Kg #N/A #N/A

0.800 Oh #N/A #N/A


0.500 Oh #N/A #N/A
0.050 Oh #N/A #N/A
0.040 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m3 #N/A #N/A


392.000 Kg #N/A #N/A
0.314 m3 49,500.00 15,543.00

1.500 Oh #N/A #N/A


0.600 Oh #N/A #N/A
0.060 Oh #N/A #N/A
0.075 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m3 #N/A #N/A


136.000 Kg #N/A #N/A
0.544 m3 49,500.00 26,928.00

1.500 Oh #N/A #N/A


0.600 Oh #N/A #N/A
0.060 Oh #N/A #N/A
0.075 Oh #N/A #N/A

#N/A #N/A #N/A

140.000 bh 49,500.00 6,930,000.00


32.950 Kg #N/A #N/A
0.091 m3 49,500.00 4,504.50

0.650 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.030 Oh #N/A #N/A

#N/A #N/A #N/A


140.000 bh 49,500.00 6,930,000.00
22.200 Kg #N/A #N/A
0.102 m3 49,500.00 5,049.00

0.650 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.030 Oh #N/A #N/A

#N/A #N/A #N/A

70.000 bh 49,500.00 3,465,000.00


14.370 Kg #N/A #N/A
0.040 m3 49,500.00 1,980.00

0.320 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.015 Oh #N/A #N/A

#N/A #N/A #N/A

70.000 bh 49,500.00 3,465,000.00


9.680 Kg #N/A #N/A
0.045 m3 49,500.00 2,227.50

0.320 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.015 Oh #N/A #N/A

#N/A #N/A #N/A

6.480 Kg #N/A #N/A


0.019 m3 49,500.00 940.50

0.200 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A


4.320 Kg #N/A #N/A
0.022 m3 49,500.00 1,089.00

0.200 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

4.320 Kg #N/A #N/A


0.003 m3 #N/A #N/A
0.013 m3 49,500.00 643.50

0.200 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

1.840 Kg #N/A #N/A


0.006 m3 #N/A #N/A
0.014 m3 49,500.00 693.00

0.200 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

3.000 Kg #N/A #N/A


0.005 m3 #N/A #N/A
0.019 m3 49,500.00 940.50

0.200 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

0.009 Kg #N/A #N/A


0.009 m3 #N/A #N/A
0.009 m3 49,500.00 445.50

0.200 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

0.007 Kg #N/A #N/A


0.007 m3 #N/A #N/A
0.015 m3 49,500.00 742.50

0.200 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

14.280 Kg #N/A #N/A


0.023 m3 49,500.00 1,138.50

0.250 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

10.800 Kg #N/A #N/A


0.026 m3 49,500.00 1,287.00

0.250 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

8.680 Kg #N/A #N/A


0.028 m3 49,500.00 1,386.00

0.250 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

7.290 Kg #N/A #N/A


0.028 m3 49,500.00 1,386.00

0.250 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

6.240 Kg #N/A #N/A


0.030 m3 49,500.00 1,485.00

0.250 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

0.009 Kg #N/A #N/A


0.009 m3 #N/A #N/A
0.018 m3 49,500.00 891.00

0.250 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

15.500 Kg #N/A #N/A


0.013 m3 49,500.00 643.50

0.300 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.013 Oh #N/A #N/A

#N/A #N/A #N/A


11.750 Kg #N/A #N/A
0.035 m3 49,500.00 1,732.50

0.300 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.013 Oh #N/A #N/A

#N/A #N/A #N/A

9.480 Kg #N/A #N/A


0.038 m3 49,500.00 1,881.00

0.300 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.013 Oh #N/A #N/A

#N/A #N/A #N/A

7.940 Kg #N/A #N/A


0.039 m3 49,500.00 1,930.50

0.300 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.013 Oh #N/A #N/A

#N/A #N/A #N/A

18.650 Kg #N/A #N/A


0.035 m3 49,500.00 1,732.50

0.320 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.015 Oh #N/A #N/A

#N/A #N/A #N/A

14.150 Kg #N/A #N/A


0.039 m3 49,500.00 1,930.50

0.320 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.015 Oh #N/A #N/A

#N/A #N/A #N/A

11.380 Kg #N/A #N/A


0.042 m3 49,500.00 2,079.00

0.320 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.015 Oh #N/A #N/A

#N/A #N/A #N/A

8.190 Kg #N/A #N/A


0.045 m3 49,500.00 2,227.50

0.320 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.015 Oh #N/A #N/A

#N/A #N/A #N/A

7.070 Kg #N/A #N/A


0.021 m3 49,500.00 1,039.50

0.150 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.008 Oh #N/A #N/A

#N/A #N/A #N/A

5.670 Kg #N/A #N/A


0.023 m3 49,500.00 1,138.50

0.150 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.008 Oh #N/A #N/A

#N/A #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00

0.260 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.013 Oh #N/A #N/A

#N/A #N/A #N/A

7.070 Kg #N/A #N/A


0.021 m3 49,500.00 1,039.50

0.260 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.013 Oh #N/A #N/A

#N/A #N/A #N/A

0.500 Kg #N/A #N/A


0.002 m3 49,500.00 99.00

0.057 Oh #N/A #N/A


0.038 Oh #N/A #N/A
0.038 Oh #N/A #N/A
0.002 Oh #N/A #N/A

#N/A #N/A #N/A

0.144 Kg #N/A #N/A


15.000 Kg #N/A #N/A

0.050 Oh #N/A #N/A


0.020 Oh #N/A #N/A
0.002 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

0.440 Kg #N/A #N/A


11.500 Kg #N/A #N/A

0.450 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.025 Oh #N/A #N/A

#N/A #N/A #N/A

4.320 Kg #N/A #N/A


0.016 m3 49,500.00 792.00

0.250 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.015 Oh #N/A #N/A

#N/A #N/A #N/A

4.320 Kg #N/A #N/A


0.016 m3 49,500.00 792.00

0.150 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.008 Oh #N/A #N/A

#N/A #N/A #N/A

0.500 Kg #N/A #N/A


2.900 Kg #N/A #N/A
0.006 m3 49,500.00 297.00

0.300 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.015 Oh #N/A #N/A

#N/A #N/A #N/A

8.0000 kg 49,500.00 396,000.00


0.0260 m3 #N/A #N/A

0.2250 org #N/A #N/A 0.00


0.1525 org #N/A #N/A 0.00
0.0100 org #N/A #N/A 0.00
0.0080 org #N/A #N/A 0.00
#N/A #N/A #N/A

5.4000 kg #N/A #N/A


0.0280 m3 #N/A #N/A

0.2250 org #N/A #N/A 0.00


0.1525 org #N/A #N/A 0.00
0.0100 org #N/A #N/A 0.00
0.0080 org #N/A #N/A 0.00

#N/A #N/A #N/A

1.100 m3 #N/A #N/A

6.000 Oh #N/A #N/A


20.000 Oh #N/A #N/A
2.000 Oh #N/A #N/A
0.300 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m3 #N/A #N/A

6.000 Oh #N/A #N/A


18.000 Oh #N/A #N/A
2.000 Oh #N/A #N/A
0.300 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m3 #N/A #N/A

6.000 Oh #N/A #N/A


18.000 Oh #N/A #N/A
2.000 Oh #N/A #N/A
0.300 Oh #N/A #N/A

#N/A #N/A #N/A

0.036 m3 #N/A #N/A


0.050 Kg #N/A #N/A

0.350 Oh #N/A #N/A


1.050 Oh #N/A #N/A
0.105 Oh #N/A #N/A
0.018 Oh #N/A #N/A

#N/A #N/A #N/A

0.036 m3 #N/A #N/A


0.050 Kg #N/A #N/A

0.350 Oh #N/A #N/A


1.050 Oh #N/A #N/A
0.105 Oh #N/A #N/A
0.018 Oh #N/A #N/A

#N/A #N/A #N/A

0.050 m3 #N/A #N/A

1.000 Oh #N/A #N/A


2.500 Oh #N/A #N/A
0.250 Oh #N/A #N/A
0.050 Oh #N/A #N/A

#N/A #N/A #N/A

0.040 m3 #N/A #N/A

1.000 Oh #N/A #N/A


2.500 Oh #N/A #N/A
0.250 Oh #N/A #N/A
0.050 Oh #N/A #N/A

#N/A #N/A #N/A

0.035 m3 #N/A #N/A

0.800 Oh #N/A #N/A


2.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.040 Oh #N/A #N/A

#N/A #N/A #N/A

0.035 m3 #N/A #N/A

0.800 Oh #N/A #N/A


2.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.040 Oh #N/A #N/A

#N/A #N/A #N/A

0.035 m3 #N/A #N/A

0.800 Oh #N/A #N/A


2.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.040 Oh #N/A #N/A

#N/A #N/A #N/A

0.064 m3 #N/A #N/A

1.000 Oh #N/A #N/A


3.000 Oh #N/A #N/A
0.300 Oh #N/A #N/A
0.300 Oh #N/A #N/A

#N/A #N/A #N/A

0.064 m3 #N/A #N/A

1.000 Oh #N/A #N/A


3.000 Oh #N/A #N/A
0.300 Oh #N/A #N/A
0.500 Oh #N/A #N/A

#N/A #N/A #N/A

0.0196 m3 #N/A #N/A


0.030 Kg #N/A #N/A
0.300 Lt #N/A #N/A
1.000 Lbr 49,500.00 49,500.00

0.600 Oh #N/A #N/A


2.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.030 Oh #N/A #N/A

#N/A #N/A #N/A


0.0196 m3 #N/A #N/A
0.030 Kg #N/A #N/A
0.300 Lt #N/A #N/A
1.000 Lbr 49,500.00 49,500.00

0.600 Oh #N/A #N/A


2.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.030 Oh #N/A #N/A

#N/A #N/A #N/A

0.0600 m3 #N/A #N/A


0.150 Kg #N/A #N/A

0.500 Oh #N/A #N/A


2.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.025 Oh #N/A #N/A

#N/A #N/A #N/A

0.0600 m3 #N/A #N/A


0.150 Kg #N/A #N/A

0.500 Oh #N/A #N/A


2.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.025 Oh #N/A #N/A

#N/A #N/A #N/A

0.0196 m3 #N/A #N/A


0.030 Kg #N/A #N/A
0.300 Lt #N/A #N/A
1.000 lbr 49,500.00 49,500.00

0.600 Oh #N/A #N/A


2.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.030 Oh #N/A #N/A

#N/A #N/A #N/A

0.0196 m3 #N/A #N/A


0.300 Kg #N/A #N/A
0.300 Lt #N/A #N/A
1.000 lbr 49,500.00 49,500.00

0.600 Oh #N/A #N/A


2.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.030 Oh #N/A #N/A

#N/A #N/A #N/A

0.0196 m3 #N/A #N/A


0.300 Kg #N/A #N/A
0.300 Lt #N/A #N/A
1.000 lbr 49,500.00 49,500.00

0.600 Oh #N/A #N/A


2.000 Oh #N/A #N/A
0.200 Oh #N/A #N/A
0.030 Oh #N/A #N/A

#N/A #N/A #N/A

0.0196 m3 #N/A #N/A


0.300 Kg #N/A #N/A
0.800 Lt #N/A #N/A
1.000 lbr 49,500.00 49,500.00
0.500 lbr #N/A #N/A

0.800 Oh #N/A #N/A


2.500 Oh #N/A #N/A
0.250 Oh #N/A #N/A
0.040 Oh #N/A #N/A

#N/A #N/A #N/A

0.0196 m3 #N/A #N/A


0.300 Kg #N/A #N/A
0.800 Lt #N/A #N/A
1.000 lbr 49,500.00 49,500.00
0.500 lbr #N/A #N/A

0.800 Oh #N/A #N/A


2.500 Oh #N/A #N/A
0.250 Oh #N/A #N/A
0.040 Oh #N/A #N/A

#N/A #N/A #N/A

0.0196 m3 #N/A #N/A


0.300 Kg #N/A #N/A
0.800 Lt #N/A #N/A
1.000 lbr 49,500.00 49,500.00
0.500 lbr 49,500.00 24,750.00

0.800 Oh #N/A #N/A


2.500 Oh #N/A #N/A
0.250 Oh #N/A #N/A
0.040 Oh #N/A #N/A

#N/A #N/A #N/A

0.0196 m3 #N/A #N/A


0.300 Kg #N/A #N/A
0.800 Lt #N/A #N/A
0.500 lbr 49,500.00 24,750.00
0.500 lbr 49,500.00 24,750.00

0.800 Oh #N/A #N/A


2.500 Oh #N/A #N/A
0.250 Oh #N/A #N/A
0.040 Oh #N/A #N/A

#N/A #N/A #N/A

0.0196 m3 #N/A #N/A


0.300 Kg #N/A #N/A
1.200 Lt #N/A #N/A
1.000 lbr 49,500.00 49,500.00
1.000 lbr 49,500.00 49,500.00

1.000 Oh #N/A #N/A


2.600 Oh #N/A #N/A
0.260 Oh #N/A #N/A
0.050 Oh #N/A #N/A

#N/A #N/A #N/A

0.0196 m3 #N/A #N/A


0.300 Kg #N/A #N/A
1.200 Lt #N/A #N/A
1.000 lbr 49,500.00 49,500.00
1.000 lbr 49,500.00 49,500.00

1.000 Oh #N/A #N/A


2.600 Oh #N/A #N/A
0.260 Oh #N/A #N/A
0.050 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m3 #N/A #N/A


15.000 #N/A #N/A
0.800 Kg #N/A #N/A

4.000 Oh #N/A #N/A


12.000 Oh #N/A #N/A
1.200 Oh #N/A #N/A
0.200 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m3 #N/A #N/A


15.000 Kg #N/A #N/A
0.800 Kg #N/A #N/A

4.000 Oh #N/A #N/A


12.000 Oh #N/A #N/A
1.200 Oh #N/A #N/A
0.200 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m3 #N/A #N/A


15.000 Kg #N/A #N/A
0.800 Kg #N/A #N/A

4.000 Oh #N/A #N/A


12.000 Oh #N/A #N/A
1.200 Oh #N/A #N/A
0.200 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m3 #N/A #N/A


15.000 Kg #N/A #N/A
0.800 Kg #N/A #N/A

4.000 Oh #N/A #N/A


12.000 Oh #N/A #N/A
1.200 Oh #N/A #N/A
0.200 Oh #N/A #N/A

#N/A #N/A #N/A

0.012 m3 #N/A #N/A


0.150 Kg #N/A #N/A

0.100 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

0.012 m3 #N/A #N/A


0.150 Kg #N/A #N/A

0.100 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

0.014 m3 #N/A #N/A


0.150 Kg #N/A #N/A

0.100 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

0.014 m3 #N/A #N/A


0.150 Kg #N/A #N/A

0.100 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

0.014 m3 #N/A #N/A


0.150 Kg #N/A #N/A

0.100 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

0.165 m3 #N/A #N/A


0.200 Kg #N/A #N/A

0.120 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.012 Oh #N/A #N/A
0.006 Oh #N/A #N/A

#N/A #N/A #N/A

0.165 m3 #N/A #N/A


0.200 Kg #N/A #N/A

0.120 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.012 Oh #N/A #N/A
0.006 Oh #N/A #N/A

#N/A #N/A #N/A

0.012 m3 #N/A #N/A


0.100 Kg #N/A #N/A

0.150 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.075 Oh #N/A #N/A

#N/A #N/A #N/A


0.0072 m3 49,500.00 356.40
0.050 Kg #N/A #N/A

0.100 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

0.012 m3 #N/A #N/A


0.100 Kg #N/A #N/A

0.150 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.075 Oh #N/A #N/A

#N/A #N/A #N/A

0.012 m3 #N/A #N/A


0.100 Kg #N/A #N/A

0.150 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.075 Oh #N/A #N/A

#N/A #N/A #N/A

0.023 m3 #N/A #N/A


0.150 Kg #N/A #N/A

0.200 Oh #N/A #N/A


0.300 Oh #N/A #N/A
0.030 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

0.023 m3 #N/A #N/A


0.150 Kg #N/A #N/A

0.200 Oh #N/A #N/A


0.300 Oh #N/A #N/A
0.030 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

0.023 m3 #N/A #N/A


0.150 Kg #N/A #N/A

0.200 Oh #N/A #N/A


0.300 Oh #N/A #N/A
0.030 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

0.027 m3 #N/A #N/A


0.200 Kg #N/A #N/A

0.250 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.035 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

0.027 m3 #N/A #N/A


0.200 Kg #N/A #N/A

0.250 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.035 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

0.027 m3 #N/A #N/A


0.200 Kg #N/A #N/A

0.250 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.035 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A


0.0072 m3 #N/A #N/A
0.050 Kg #N/A #N/A

0.100 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

0.0072 m3 #N/A #N/A


0.050 Kg #N/A #N/A

0.100 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

0.0110 m3 #N/A #N/A


0.050 Kg #N/A #N/A

0.110 Oh #N/A #N/A


0.220 Oh #N/A #N/A
0.022 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

0.0110 m3 #N/A #N/A


0.050 Kg #N/A #N/A

0.110 Oh #N/A #N/A


0.220 Oh #N/A #N/A
0.022 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

0.0145 m3 #N/A #N/A


0.060 Kg #N/A #N/A

0.150 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.075 Oh #N/A #N/A

#N/A #N/A #N/A

0.0086 m3 #N/A #N/A


0.060 Kg #N/A #N/A

0.100 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.050 Oh #N/A #N/A

#N/A #N/A #N/A

0.0088 m3 #N/A #N/A


0.060 Kg #N/A #N/A

0.100 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.050 Oh #N/A #N/A

#N/A #N/A #N/A

0.0195 m3 #N/A #N/A


0.007 m3 #N/A #N/A
0.100 Kg #N/A #N/A

0.150 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.045 Oh #N/A #N/A
0.075 Oh #N/A #N/A

#N/A #N/A #N/A

0.0195 m3 #N/A #N/A


0.007 m3 #N/A #N/A
0.100 Kg #N/A #N/A

0.150 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.045 Oh #N/A #N/A
0.075 Oh #N/A #N/A
#N/A #N/A #N/A

0.0195 m3 #N/A #N/A


0.007 m3 #N/A #N/A
0.100 Kg #N/A #N/A

0.150 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.045 Oh #N/A #N/A
0.075 Oh #N/A #N/A

#N/A #N/A #N/A

0.0195 m3 #N/A #N/A


0.007 m3 #N/A #N/A
0.100 Kg #N/A #N/A

0.150 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.045 Oh #N/A #N/A
0.075 Oh #N/A #N/A

#N/A #N/A #N/A

0.0195 m3 #N/A #N/A


0.007 m3 #N/A #N/A
0.100 Kg #N/A #N/A
0.560 lt #N/A #N/A
1.000 lbr 49,500.00 49,500.00

0.200 Oh #N/A #N/A


0.600 Oh #N/A #N/A
0.060 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

0.007 m3 #N/A #N/A


0.100 Kg #N/A #N/A
0.150 Kg #N/A #N/A

0.600 Oh #N/A #N/A


1.800 Oh #N/A #N/A
0.180 Oh #N/A #N/A
0.030 Oh #N/A #N/A
#N/A #N/A #N/A

0.400 lbr 49,500.00 19,800.00


0.050 Kg #N/A #N/A

0.025 Oh #N/A #N/A


0.075 Oh #N/A #N/A
0.0075 Oh #N/A #N/A
0.0013 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m' #N/A #N/A

0.021 Oh #N/A #N/A


0.021 Oh #N/A #N/A
0.0020 Oh #N/A #N/A
0.0010 Oh #N/A #N/A

#N/A #N/A #N/A

10.000 Kg #N/A #N/A


0.026 m3 49,500.00 1,287.00
0.044 m3 #N/A #N/A

1.150 Oh #N/A #N/A


0.020 Oh #N/A #N/A
0.002 Oh #N/A #N/A
0.006 Oh #N/A #N/A

#N/A #N/A #N/A

218.000 Kg #N/A #N/A


0.520 m3 49,500.00 25,740.00
0.870 m3 #N/A #N/A

1.650 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.080 Oh #N/A #N/A

#N/A #N/A #N/A


197.000 Kg #N/A #N/A
0.470 m3 49,500.00 23,265.00
0.940 m3 #N/A #N/A

1.650 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.080 Oh #N/A #N/A

#N/A #N/A #N/A

173.000 Kg #N/A #N/A


0.570 m3 49,500.00 28,215.00
0.870 m3 #N/A #N/A

1.650 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.080 Oh #N/A #N/A

#N/A #N/A #N/A

232.000 Kg #N/A #N/A


0.520 m3 49,500.00 25,740.00
0.780 m3 #N/A #N/A

1.650 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.080 Oh #N/A #N/A

#N/A #N/A #N/A

280.000 Kg #N/A #N/A


0.450 m3 49,500.00 22,275.00
0.900 m3 #N/A #N/A

1.650 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.080 Oh #N/A #N/A

#N/A #N/A #N/A


352.000 Kg #N/A #N/A
0.560 m3 49,500.00 27,720.00
0.700 m3 #N/A #N/A

1.650 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.080 Oh #N/A #N/A

#N/A #N/A #N/A

357.000 Kg #N/A #N/A


0.420 m3 49,500.00 20,790.00
0.540 m3 #N/A #N/A

1.650 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.080 Oh #N/A #N/A

#N/A #N/A #N/A

386.000 Kg #N/A #N/A


0.470 m3 49,500.00 23,265.00
0.780 m3 #N/A #N/A

1.650 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.080 Oh #N/A #N/A

#N/A #N/A #N/A

479.000 Kg #N/A #N/A


0.370 m3 49,500.00 18,315.00
0.740 m3 #N/A #N/A

1.650 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.080 Oh #N/A #N/A

#N/A #N/A #N/A

479.000 Kg #N/A #N/A


0.370 m3 49,500.00 18,315.00
0.740 m3 #N/A #N/A
2.460 gln #N/A #N/A

1.650 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.080 Oh #N/A #N/A

#N/A #N/A #N/A

336.000 Kg #N/A #N/A


0.540 m3 49,500.00 26,730.00
0.810 m3 #N/A #N/A

2.000 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.035 Oh #N/A #N/A
1.000 Oh #N/A #N/A

#N/A #N/A #N/A

291.000 Kg #N/A #N/A


0.470 m3 49,500.00 23,265.00
0.930 m3 #N/A #N/A

2.000 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.035 Oh #N/A #N/A
1.000 Oh #N/A #N/A

#N/A #N/A #N/A

367.000 Kg #N/A #N/A


0.440 m3 49,500.00 21,780.00
0.880 m3 #N/A #N/A

2.000 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.035 Oh #N/A #N/A
1.000 Oh #N/A #N/A

#N/A #N/A #N/A

400.000 Kg #N/A #N/A


0.480 m3 49,500.00 23,760.00
0.800 m3 #N/A #N/A

2.000 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.035 Oh #N/A #N/A
1.000 Oh #N/A #N/A

#N/A #N/A #N/A

615.000 Kg #N/A #N/A


0.520 m3 49,500.00 25,740.00
0.520 m3 #N/A #N/A

2.000 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.035 Oh #N/A #N/A
1.000 Oh #N/A #N/A

#N/A #N/A #N/A

400.000 Kg #N/A #N/A


0.480 m3 49,500.00 23,760.00
0.800 m3 #N/A #N/A
1.200 Kg #N/A #N/A

2.000 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.035 Oh #N/A #N/A
1.000 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m' #N/A #N/A

0.050 Oh #N/A #N/A


0.030 Oh #N/A #N/A
0.003 Oh #N/A #N/A
0.002 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m' #N/A #N/A

0.050 Oh #N/A #N/A


0.030 Oh #N/A #N/A
0.0035 Oh #N/A #N/A
0.002 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m' #N/A #N/A

0.550 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.003 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m' #N/A #N/A

0.550 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.003 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m' #N/A #N/A

0.550 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.003 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m' #N/A #N/A

0.550 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.003 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 Kg #N/A #N/A


0.015 Kg #N/A #N/A

0.007 Oh #N/A #N/A


0.007 Oh #N/A #N/A
0.0007 Oh #N/A #N/A
0.0003 Oh #N/A #N/A
#N/A #N/A #N/A

1.050 Kg #N/A #N/A


0.010 Kg #N/A #N/A

0.005 Oh #N/A #N/A


0.005 Oh #N/A #N/A
0.0005 Oh #N/A #N/A
0.0003 Oh #N/A #N/A

#N/A #N/A #N/A

1.020 Kg #N/A #N/A


0.805 Kg #N/A #N/A

0.025 Oh #N/A #N/A


0.025 Oh #N/A #N/A
0.0025 Oh #N/A #N/A
0.0015 Oh #N/A #N/A

#N/A #N/A #N/A

0.040 m3 49,500.00 1,980.00


0.400 Kg #N/A #N/A
0.200 Lt #N/A #N/A
0.350 lbr 49,500.00 17,325.00
2.000 btg #N/A #N/A

0.300 Oh #N/A #N/A


0.330 Oh #N/A #N/A
0.0330 Oh #N/A #N/A
0.0060 Oh #N/A #N/A

29,115.90 #VALUE! #VALUE!

0.0882 m3 49,500.00 4,365.90


0.5000 kg 49,500.00 24,750.00

0.1500 org HARGA UPAH #VALUE!


0.2000 org HARGA UPAH #VALUE!
0.2000 org #N/A #N/A
0.0170 org #N/A #N/A

#N/A #N/A #N/A


0.040 m3 49,500.00 1,980.00
0.300 Kg #N/A #N/A
0.100 Lt #N/A #N/A

0.300 Oh #N/A #N/A


0.260 Oh #N/A #N/A
0.0260 Oh #N/A #N/A
0.0050 Oh #N/A #N/A

#N/A #N/A #N/A

0.040 m3 49,500.00 1,980.00


0.300 Kg #N/A #N/A
0.100 Lt #N/A #N/A

0.300 Oh #N/A #N/A


0.260 Oh #N/A #N/A
0.0260 Oh #N/A #N/A
0.0050 Oh #N/A #N/A

#N/A #N/A #N/A

0.040 m3 49,500.00 1,980.00


0.400 Kg #N/A #N/A
0.200 Lt #N/A #N/A
0.015 m3 #N/A #N/A
0.350 lbr 49,500.00 17,325.00
2.000 btg #N/A #N/A

0.300 Oh #N/A #N/A


0.330 Oh #N/A #N/A
0.0330 Oh #N/A #N/A
0.0060 Oh #N/A #N/A

#N/A #N/A #N/A

0.040 m3 49,500.00 1,980.00


0.400 Kg #N/A #N/A
0.200 Lt #N/A #N/A
0.018 m3 #N/A #N/A
0.350 lbr 49,500.00 17,325.00
2.000 btg #N/A #N/A

0.320 Oh #N/A #N/A


0.330 Oh #N/A #N/A
0.0330 Oh #N/A #N/A
0.0060 Oh #N/A #N/A

#N/A #N/A #N/A

0.040 m3 49,500.00 1,980.00


0.400 Kg #N/A #N/A
0.200 Lt #N/A #N/A
0.015 m3 #N/A #N/A
0.350 lbr 49,500.00 17,325.00
6.000 btg #N/A #N/A

0.320 Oh #N/A #N/A


0.330 Oh #N/A #N/A
0.033 Oh #N/A #N/A
0.006 Oh #N/A #N/A

#N/A #N/A #N/A

0.040 m3 49,500.00 1,980.00


0.400 Kg #N/A #N/A
0.200 Lt #N/A #N/A
0.015 m3 #N/A #N/A
0.350 lbr 49,500.00 17,325.00
6.000 btg #N/A #N/A
4.000 bh #N/A #N/A

0.320 Oh #N/A #N/A


0.330 Oh #N/A #N/A
0.033 Oh #N/A #N/A
0.006 Oh #N/A #N/A

#N/A #N/A #N/A

0.030 m3 49,500.00 1,485.00


0.400 Kg #N/A #N/A
0.150 Lt #N/A #N/A
0.015 m3 #N/A #N/A
0.350 lbr 49,500.00 17,325.00
2.000 btg #N/A #N/A

0.320 Oh #N/A #N/A


0.330 Oh #N/A #N/A
0.033 Oh #N/A #N/A
0.006 Oh #N/A #N/A

#N/A #N/A #N/A

0.200 m3 49,500.00 9,900.00


1.500 Kg #N/A #N/A
0.400 Lt #N/A #N/A
150.000 Kg #N/A #N/A
2.250 Kg #N/A #N/A
323.000 Kg #N/A #N/A
0.520 m3 49,500.00 25,740.00
0.780 m3 #N/A #N/A

3.900 Oh #N/A #N/A


0.350 Oh #N/A #N/A
1.040 Oh #N/A #N/A
1.050 Oh #N/A #N/A
0.245 Oh #N/A #N/A
0.165 Oh #N/A #N/A

#N/A #N/A #N/A

0.270 m3 49,500.00 13,365.00


2.000 Kg #N/A #N/A
0.600 Lt #N/A #N/A
200.000 Kg #N/A #N/A
3.000 Kg #N/A #N/A
323.000 Kg #N/A #N/A
0.520 m3 49,500.00 25,740.00
0.780 m3 #N/A #N/A

4.850 Oh #N/A #N/A


0.350 Oh #N/A #N/A
1.560 Oh #N/A #N/A
1.400 Oh #N/A #N/A
0.331 Oh #N/A #N/A
0.170 Oh #N/A #N/A

#N/A #N/A #N/A

0.400 m3 49,500.00 19,800.00


4.000 Kg #N/A #N/A
2.000 Lt #N/A #N/A
300.000 Kg #N/A #N/A
4.500 Kg #N/A #N/A
323.000 Kg #N/A #N/A
0.520 m3 49,500.00 25,740.00
0.780 m3 #N/A #N/A
0.150 m3 #N/A #N/A
3.500 lbr #N/A #N/A
20.000 btg #N/A #N/A

7.300 Oh #N/A #N/A


0.350 Oh #N/A #N/A
3.300 Oh #N/A #N/A
2.100 Oh #N/A #N/A
0.570 Oh #N/A #N/A
0.250 Oh #N/A #N/A

#N/A #N/A #N/A

0.320 m3 49,500.00 15,840.00


3.200 Kg #N/A #N/A
1.600 Lt #N/A #N/A
200.000 Kg #N/A #N/A
3.000 Kg #N/A #N/A
323.000 Kg #N/A #N/A
0.520 m3 49,500.00 25,740.00
0.780 m3 #N/A #N/A
0.140 m3 #N/A #N/A
2.800 lbr #N/A #N/A
16.000 btg #N/A #N/A

5.960 Oh #N/A #N/A


0.350 Oh #N/A #N/A
2.800 Oh #N/A #N/A
1.400 Oh #N/A #N/A
0.455 Oh #N/A #N/A
0.208 Oh #N/A #N/A

#N/A #N/A #N/A

0.320 m3 49,500.00 15,840.00


3.200 Kg #N/A #N/A
1.600 Lt #N/A #N/A
150.000 Kg #N/A #N/A
2.250 Kg #N/A #N/A
323.000 Kg #N/A #N/A
0.520 m3 49,500.00 25,740.00
0.780 m3 #N/A #N/A
0.120 m3 #N/A #N/A
2.800 lbr #N/A #N/A
32.000 btg #N/A #N/A

5.800 Oh #N/A #N/A


0.350 Oh #N/A #N/A
2.800 Oh #N/A #N/A
1.050 Oh #N/A #N/A
0.420 Oh #N/A #N/A
0.185 Oh #N/A #N/A

#N/A #N/A #N/A

0.240 m3 49,500.00 11,880.00


3.200 Kg #N/A #N/A
1.600 Lt #N/A #N/A
150.000 Kg #N/A #N/A
2.250 Kg #N/A #N/A
323.000 Kg #N/A #N/A
0.520 m3 49,500.00 25,740.00
0.780 m3 #N/A #N/A
0.160 m3 #N/A #N/A
2.800 lbr #N/A #N/A
24.000 btg #N/A #N/A

5.600 Oh #N/A #N/A


0.350 Oh #N/A #N/A
2.640 Oh #N/A #N/A
1.050 Oh #N/A #N/A
0.400 Oh #N/A #N/A
0.193 Oh #N/A #N/A

#N/A #N/A #N/A

0.250 m3 49,500.00 12,375.00


3.000 Kg #N/A #N/A
1.200 Lt #N/A #N/A
200.000 Kg #N/A #N/A
3.000 Kg #N/A #N/A
323.000 Kg #N/A #N/A
0.520 m3 49,500.00 25,740.00
0.780 m3 #N/A #N/A
0.105 m3 #N/A #N/A
2.500 lbr #N/A #N/A
14.000 btg #N/A #N/A
5.600 Oh #N/A #N/A
0.350 Oh #N/A #N/A
2.300 Oh #N/A #N/A
1.400 Oh #N/A #N/A
0.405 Oh #N/A #N/A
0.202 Oh #N/A #N/A

#N/A #N/A #N/A

0.002 m3 49,500.00 99.00


0.010 Kg #N/A #N/A
3.000 Kg #N/A #N/A
0.450 Kg #N/A #N/A
4.000 Kg #N/A #N/A
0.006 m3 49,500.00 297.00
0.009 m3 #N/A #N/A

0.060 Oh #N/A #N/A


0.020 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.006 Oh #N/A #N/A
0.003 Oh #N/A #N/A

#N/A #N/A #N/A

0.003 m3 #N/A #N/A


0.200 Kg #N/A #N/A
3.600 Kg #N/A #N/A
0.050 Kg #N/A #N/A
5.500 Kg #N/A #N/A
0.009 m3 49,500.00 445.50
0.015 m3 #N/A #N/A

0.100 Oh #N/A #N/A


0.330 Oh #N/A #N/A
0.033 Oh #N/A #N/A
0.033 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A


25.000 bh #N/A #N/A

0.150 Oh #N/A #N/A


0.075 Oh #N/A #N/A
0.008 Oh #N/A #N/A
0.008 Oh #N/A #N/A

#N/A #N/A #N/A

25.000 bh #N/A #N/A

0.150 Oh #N/A #N/A


0.075 Oh #N/A #N/A
0.008 Oh #N/A #N/A
0.008 Oh #N/A #N/A

#N/A #N/A #N/A

12.000 bh #N/A #N/A

0.150 Oh #N/A #N/A


0.060 Oh #N/A #N/A
0.006 Oh #N/A #N/A
0.008 Oh #N/A #N/A

#N/A #N/A #N/A

5.000 bh #N/A #N/A


8.000 Kg #N/A #N/A
0.032 m3 49,500.00 1,584.00

0.400 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.002 Oh #N/A #N/A

#N/A #N/A #N/A

5.000 bh #N/A #N/A


8.000 Kg #N/A #N/A
0.032 m3 49,500.00 1,584.00

0.400 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.002 Oh #N/A #N/A

#N/A #N/A #N/A

4.000 bh #N/A #N/A


8.000 Kg #N/A #N/A
0.032 m3 49,500.00 1,584.00

0.400 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.002 Oh #N/A #N/A

#N/A #N/A #N/A

0.600 lbr #N/A #N/A


0.050 Kg 49,500.00 2,475.00

0.140 Oh #N/A #N/A


0.067 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

0.500 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.075 Oh #N/A #N/A
0.008 Oh #N/A #N/A
0.008 Oh #N/A #N/A

#N/A #N/A #N/A

0.600 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.075 Oh #N/A #N/A
0.008 Oh #N/A #N/A
0.008 Oh #N/A #N/A

#N/A #N/A #N/A


0.600 lbr #N/A #N/A
0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

0.750 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

0.350 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

0.420 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

0.440 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.067 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

0.510 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.067 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

0.800 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.067 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

0.370 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.067 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

0.380 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.067 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A


0.460 lbr #N/A #N/A
0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.067 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

0.490 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.067 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

0.570 lbr #N/A #N/A


0.120 Kg #N/A #N/A

0.140 Oh #N/A #N/A


0.067 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.007 Oh #N/A #N/A

#N/A #N/A #N/A

2.400 lbr #N/A #N/A


6.000 Kg #N/A #N/A

0.084 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.013 Oh #N/A #N/A
0.004 Oh #N/A #N/A

#N/A #N/A #N/A

2.400 lbr #N/A #N/A


6.000 bh 49,500.00 297,000.00

0.084 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.013 Oh #N/A #N/A
0.004 Oh #N/A #N/A

#N/A #N/A #N/A

2.100 lbr #N/A #N/A


6.000 bh 49,500.00 297,000.00

0.084 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.013 Oh #N/A #N/A
0.004 Oh #N/A #N/A

#N/A #N/A #N/A

2.050 lbr #N/A #N/A


6.000 bh 49,500.00 297,000.00

0.084 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.013 Oh #N/A #N/A
0.004 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 lbr #N/A #N/A


6.000 bh 49,500.00 297,000.00

0.084 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.013 Oh #N/A #N/A
0.004 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 lbr #N/A #N/A


6.000 bh 49,500.00 297,000.00

0.084 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.013 Oh #N/A #N/A
0.004 Oh #N/A #N/A

#N/A #N/A #N/A


1.200 lbr #N/A #N/A
6.000 bh 49,500.00 297,000.00

0.084 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.013 Oh #N/A #N/A
0.004 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 lbr #N/A #N/A


6.000 bh 49,500.00 297,000.00

0.100 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.013 Oh #N/A #N/A
0.004 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 lbr #N/A #N/A


6.000 bh 49,500.00 297,000.00

0.084 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.013 Oh #N/A #N/A
0.004 Oh #N/A #N/A

#N/A #N/A #N/A

11.000 lbr #N/A #N/A


0.030 bh #N/A #N/A

0.200 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

6.900 lbr #N/A #N/A


0.350 lbr 49,500.00 17,325.00
0.030 Kg #N/A #N/A
0.500 Bh #N/A #N/A
0.200 Oh #N/A #N/A
0.300 Oh #N/A #N/A
0.003 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

1.020 lbr #N/A #N/A


0.200 Kg #N/A #N/A

0.200 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.001 Oh #N/A #N/A

#N/A #N/A #N/A

60.000 lbr #N/A #N/A


0.200 Kg #N/A #N/A

0.166 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.008 Oh #N/A #N/A

#N/A #N/A #N/A

3.500 lbr #N/A #N/A


0.050 Kg #N/A #N/A
10.800 Kg #N/A #N/A
0.032 m3 49,500.00 1,584.00
1.000 Kg 49,500.00 49,500.00

0.400 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.020 Oh #N/A #N/A

#N/A #N/A #N/A

2.000 lbr #N/A #N/A


0.050 Kg #N/A #N/A
0.0035 Kg #N/A #N/A

0.125 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.006 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 lbr #N/A #N/A


0.050 Kg #N/A #N/A

0.250 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.013 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 lbr #N/A #N/A


0.050 Kg #N/A #N/A

0.250 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.013 Oh #N/A #N/A

#N/A #N/A #N/A

0.400 Lbr #N/A #N/A


0.060 Kg #N/A #N/A
0.050 Kg #N/A #N/A
0.004 m3 #N/A #N/A

0.125 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.006 Oh #N/A #N/A

#N/A #N/A #N/A

0.700 Lbr #N/A #N/A


0.020 Kg #N/A #N/A

0.120 Oh #N/A #N/A


0.060 Oh #N/A #N/A
0.006 Oh #N/A #N/A
0.006 Oh #N/A #N/A
#N/A #N/A #N/A

0.300 Lbr #N/A #N/A


0.040 Kg #N/A #N/A

0.015 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.008 Oh #N/A #N/A
0.006 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m2 #N/A #N/A


0.020 Kg #N/A #N/A

0.015 Oh #N/A #N/A


0.075 Oh #N/A #N/A
0.008 Oh #N/A #N/A
0.006 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m2 #N/A #N/A


0.040 Kg #N/A #N/A

0.100 Oh #N/A #N/A


1.000 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.010 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m2 #N/A #N/A

0.150 Oh #N/A #N/A


0.050 Oh #N/A #N/A
0.005 Oh #N/A #N/A
0.008 Oh #N/A #N/A

11,929.50 #N/A #N/A

0.0210 m3 49,500.00 1,039.50


0.2200 kg 49,500.00 10,890.00
0.1875 org #N/A #N/A 0.00
0.2250 org #N/A #N/A 0.00
0.0375 org HARGA UPAH #VALUE! 0.00
0.0105 org #N/A #N/A 0.00

#N/A #N/A #N/A

1.100 lbr #N/A #N/A


0.010 Kg 49,500.00 495.00

0.030 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.0015 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 lbr #N/A #N/A


0.010 Kg 49,500.00 495.00

0.030 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.0015 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 lbr #N/A #N/A


0.010 Kg 49,500.00 495.00

0.030 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.0015 Oh #N/A #N/A

571,725.00 #N/A #N/A

11.500 lbr 49,500.00 569,250.00


0.050 Kg 49,500.00 2,475.00

0.060 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.012 Oh #N/A #N/A
0.0030 Oh #N/A #N/A
289,575.00 #N/A #N/A

5.800 lbr 49,500.00 287,100.00


0.050 Kg 49,500.00 2,475.00

0.060 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0030 Oh #N/A #N/A

#N/A #N/A #N/A

1.500 lbr #N/A #N/A


0.050 Kg 49,500.00 2,475.00

0.060 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0030 Oh #N/A #N/A

19,305.00 #N/A #N/A

0.360 lbr 49,500.00 17,820.00


0.030 Kg 49,500.00 1,485.00

0.070 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0035 Oh #N/A #N/A

19,305.00 #N/A #N/A

0.360 lbr 49,500.00 17,820.00


0.030 Kg 49,500.00 1,485.00

0.070 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0035 Oh #N/A #N/A

19,305.00 #N/A #N/A

0.360 lbr 49,500.00 17,820.00


0.030 Kg 49,500.00 1,485.00
0.070 Oh #N/A #N/A
0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0035 Oh #N/A #N/A

19,305.00 #N/A #N/A

0.360 lbr 49,500.00 17,820.00


0.030 Kg 49,500.00 1,485.00

0.070 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0035 Oh #N/A #N/A

#N/A #N/A #N/A

0.360 lbr #N/A #N/A


0.030 Kg 49,500.00 1,485.00

0.070 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0035 Oh #N/A #N/A

#N/A #N/A #N/A

0.360 lbr #N/A #N/A


0.030 Kg 49,500.00 1,485.00

0.070 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0035 Oh #N/A #N/A

19,305.00 #N/A #N/A

0.360 lbr 49,500.00 17,820.00


0.030 Kg 49,500.00 1,485.00

0.070 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0035 Oh #N/A #N/A
#N/A #N/A #N/A

0.024 m3 #N/A #N/A


0.010 Kg 49,500.00 495.00
0.050 Kg #N/A #N/A

0.200 Oh #N/A #N/A


0.600 Oh #N/A #N/A
0.060 Oh #N/A #N/A
0.0100 Oh #N/A #N/A

#N/A #N/A #N/A

0.024 lbr #N/A #N/A


0.010 Kg 49,500.00 495.00
0.050 Kg #N/A #N/A

0.200 Oh #N/A #N/A


0.600 Oh #N/A #N/A
0.060 Oh #N/A #N/A
0.0100 Oh #N/A #N/A

#N/A #N/A #N/A

0.024 lbr #N/A #N/A


0.010 Kg 49,500.00 495.00
0.050 Kg #N/A #N/A

0.200 Oh #N/A #N/A


0.600 Oh #N/A #N/A
0.060 Oh #N/A #N/A
0.0100 Oh #N/A #N/A

#N/A #N/A #N/A

0.350 lbr #N/A #N/A


0.030 Kg 49,500.00 1,485.00

0.600 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0030 Oh #N/A #N/A

#N/A #N/A #N/A


3.600 m' #N/A #N/A
0.150 Kg #N/A #N/A
1.000 bh #N/A #N/A
1.500 lbr #N/A #N/A

0.150 Oh #N/A #N/A


0.500 Oh #N/A #N/A
0.050 Oh #N/A #N/A
0.0075 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m' #N/A #N/A


0.010 Kg #N/A #N/A

0.050 Oh #N/A #N/A


0.050 Oh #N/A #N/A
0.005 Oh #N/A #N/A
0.0030 Oh #N/A #N/A

#N/A #N/A #N/A

0.023 m3 #N/A #N/A


0.060 Kg 49,500.00 2,970.00
0.390 lbr 49,500.00 19,305.00

0.270 Oh #N/A #N/A


0.400 Oh #N/A #N/A
0.040 Oh #N/A #N/A
0.0135 Oh #N/A #N/A

#N/A #N/A #N/A

0.012 m3 #N/A #N/A


0.060 Kg 49,500.00 2,970.00
1.100 lbr #N/A #N/A

0.180 Oh #N/A #N/A


0.320 Oh #N/A #N/A
0.032 Oh #N/A #N/A
0.0090 Oh #N/A #N/A

#N/A #N/A #N/A


0.023 m3 #N/A #N/A
0.060 Kg 49,500.00 2,970.00
5.800 lbr #N/A #N/A

0.260 Oh #N/A #N/A


0.400 Oh #N/A #N/A
0.040 Oh #N/A #N/A
0.0130 Oh #N/A #N/A

#N/A #N/A #N/A

0.027 m3 #N/A #N/A


0.060 Kg 49,500.00 2,970.00
11.500 lbr #N/A #N/A

0.310 Oh #N/A #N/A


0.470 Oh #N/A #N/A
0.047 Oh #N/A #N/A
0.0155 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A


30% Dari bahan #N/A #N/A

3.300 Oh #N/A #N/A


1.100 Oh #N/A #N/A
0.001 Oh #N/A #N/A
0.1600 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A


6.000 Kg #N/A #N/A
0.010 m3 49,500.00 495.00

1.000 Oh #N/A #N/A


1.500 Oh #N/A #N/A
1.500 Oh #N/A #N/A
0.1600 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A


7.000 bh 49,500.00 346,500.00
6.000 Kg #N/A #N/A
0.010 m3 49,500.00 495.00

1.000 Oh #N/A #N/A


1.500 Oh #N/A #N/A
0.300 Oh #N/A #N/A
0.1100 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A


30% Harga Urinoir #N/A #N/A
6.000 Kg #N/A #N/A
0.010 m3 49,500.00 495.00

1.000 Oh #N/A #N/A


1.000 Oh #N/A #N/A
0.100 Oh #N/A #N/A
0.1000 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A


12% Harga Urinoir #N/A #N/A
6.000 Kg 49,500.00 297,000.00
0.010 m3 49,500.00 495.00

1.000 Oh #N/A #N/A


1.450 Oh #N/A #N/A
0.150 Oh #N/A #N/A
0.1000 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A


6.000 Kg #N/A #N/A
0.010 m3 49,500.00 495.00

2.100 Oh #N/A #N/A


0.750 Oh #N/A #N/A
0.070 Oh #N/A #N/A
0.1100 Oh #N/A #N/A

58,410.00 #N/A #N/A


1.000 bh 49,500.00 49,500.00
18% Harga Bak 8,910.00 8,910.00

1.800 Oh #N/A #N/A


2.700 Oh #N/A #N/A
0.540 Oh #N/A #N/A
0.1100 Oh #N/A #N/A

#N/A #N/A #N/A

0.400 m3 49,500.00 19,800.00


120.000 Kg #N/A #N/A
0.300 m3 49,500.00 14,850.00
360.000 bh #N/A #N/A
6.000 Kg #N/A #N/A

6.000 Oh #N/A #N/A


3.000 Oh #N/A #N/A
0.300 Oh #N/A #N/A
0.3000 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A


20% harga Badkip #N/A #N/A

- Oh #N/A #N/A
0.075 Oh #N/A #N/A
0.750 Oh #N/A #N/A
0.2500 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A


12% Harga Bak #N/A

3.000 Oh #N/A #N/A


4.500 Oh #N/A #N/A
0.900 Oh #N/A #N/A
0.9000 Oh #N/A #N/A

#N/A #N/A #N/A


1.600 bh #N/A #N/A
0.680 Kg #N/A #N/A
0.013 m3 49,500.00 643.50
0.011 m3 #N/A #N/A

0.060 Oh #N/A #N/A


0.030 Oh #N/A #N/A
0.003 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

1.600 bh #N/A #N/A


0.870 Kg #N/A #N/A
0.014 m3 49,500.00 693.00
0.014 m3 #N/A #N/A

0.080 Oh #N/A #N/A


0.040 Oh #N/A #N/A
0.004 Oh #N/A #N/A
0.0070 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 bh #N/A #N/A


0.270 m3 49,500.00 13,365.00
3.920 Kg #N/A #N/A
0.056 m3 49,500.00 2,772.00
0.024 m3 #N/A #N/A

0.140 Oh #N/A #N/A


0.070 Oh #N/A #N/A
0.007 Oh #N/A #N/A
0.0070 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 bh #N/A #N/A


0.550 m3 49,500.00 27,225.00
10.300 Kg #N/A #N/A
0.061 m3 49,500.00 3,019.50
0.069 m3 #N/A #N/A

0.380 Oh #N/A #N/A


0.190 Oh #N/A #N/A
0.019 Oh #N/A #N/A
0.0190 Oh #N/A #N/A

#N/A #N/A #N/A

0.145 m3 49,500.00 7,177.50


44.000 Kg #N/A #N/A
0.070 m3 49,500.00 3,465.00
0.070 m3 #N/A #N/A
1.600 Kg #N/A #N/A
0.060 m3 49,500.00 2,970.00

3.200 Oh #N/A #N/A


1.015 Oh #N/A #N/A
0.0015 Oh #N/A #N/A
0.0160 Oh #N/A #N/A

#N/A #N/A #N/A

0.250 m3 49,500.00 12,375.00


77.000 Kg #N/A #N/A
0.130 m3 49,500.00 6,435.00
0.020 m3 #N/A #N/A
2.600 Kg #N/A #N/A
0.090 m3 49,500.00 4,455.00

1.420 Oh #N/A #N/A


0.473 Oh #N/A #N/A
0.0470 Oh #N/A #N/A
0.0710 Oh #N/A #N/A

#N/A #N/A #N/A

0.371 m3 49,500.00 18,364.50


114.000 Kg #N/A #N/A
0.184 m3 49,500.00 9,108.00
0.033 m3 #N/A #N/A
4.850 Kg #N/A #N/A
0.120 m3 49,500.00 5,940.00

2.160 Oh #N/A #N/A


0.720 Oh #N/A #N/A
0.0720 Oh #N/A #N/A
0.1080 Oh #N/A #N/A
0.1000 Oh #N/A #N/A
#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.054 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0270 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.054 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0270 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.054 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0270 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.108 Oh #N/A #N/A


0.180 Oh #N/A #N/A
0.0180 Oh #N/A #N/A
0.0054 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A
0.108 Oh #N/A #N/A
0.180 Oh #N/A #N/A
0.0180 Oh #N/A #N/A
0.0054 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.135 Oh #N/A #N/A


0.225 Oh #N/A #N/A
0.0225 Oh #N/A #N/A
0.0068 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.036 Oh #N/A #N/A


0.060 Oh #N/A #N/A
0.0060 Oh #N/A #N/A
0.0018 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.036 Oh #N/A #N/A


0.060 Oh #N/A #N/A
0.0060 Oh #N/A #N/A
0.0018 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.036 Oh #N/A #N/A


0.060 Oh #N/A #N/A
0.0060 Oh #N/A #N/A
0.0018 Oh #N/A #N/A
#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.036 Oh #N/A #N/A


0.060 Oh #N/A #N/A
0.0060 Oh #N/A #N/A
0.0018 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.054 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0027 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.036 Oh #N/A #N/A


0.060 Oh #N/A #N/A
0.0060 Oh #N/A #N/A
0.0018 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A

0.081 Oh #N/A #N/A


0.135 Oh #N/A #N/A
0.0135 Oh #N/A #N/A
0.0041 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m' #N/A #N/A


35% Harga Pipa #N/A #N/A
0.081 Oh #N/A #N/A
0.135 Oh #N/A #N/A
0.0135 Oh #N/A #N/A
0.0041 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A


1.000 set 49,500.00 49,500.00

0.030 Oh #N/A #N/A


0.300 Oh #N/A #N/A
0.0300 Oh #N/A #N/A
0.0015 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A


1.000 set #N/A #N/A
20.000 Kg #N/A #N/A
0.050 m3 49,500.00 2,475.00

0.050 Oh #N/A #N/A


0.500 Oh #N/A #N/A
0.0500 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A


0.025 bh #N/A #N/A

0.010 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.0100 Oh #N/A #N/A
0.0050 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 bh #N/A #N/A

0.010 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.0100 Oh #N/A #N/A
0.0050 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 Kg #N/A #N/A


0.080 Kg #N/A #N/A

0.006 Oh #N/A #N/A


0.060 Oh #N/A #N/A
0.0060 Oh #N/A #N/A
0.0003 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 m2 #N/A #N/A

0.650 Oh #N/A #N/A


0.650 Oh #N/A #N/A
0.0650 Oh #N/A #N/A
0.0320 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 m2 #N/A #N/A

1.050 Oh #N/A #N/A


1.050 Oh #N/A #N/A
0.1050 Oh #N/A #N/A
0.00525 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 m2 #N/A #N/A

1.022 Oh #N/A #N/A


1.200 Oh #N/A #N/A
0.1200 Oh #N/A #N/A
0.0060 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 m2 #N/A #N/A

1.200 Oh #N/A #N/A


1.200 Oh #N/A #N/A
0.1200 Oh #N/A #N/A
0.0060 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 m2 #N/A #N/A

1.050 Oh #N/A #N/A


1.050 Oh #N/A #N/A
0.1050 Oh #N/A #N/A
0.0052 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 m2 #N/A #N/A

0.080 Oh #N/A #N/A


0.800 Oh #N/A #N/A
0.080 Oh #N/A #N/A
0.004 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 m2 #N/A #N/A

1.050 Oh #N/A #N/A


1.500 Oh #N/A #N/A
0.105 Oh #N/A #N/A
0.0052 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 m2 #N/A #N/A

1.050 Oh #N/A #N/A


1.050 Oh #N/A #N/A
0.105 Oh #N/A #N/A
0.0052 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 m2 #N/A #N/A

0.350 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.035 Oh #N/A #N/A
0.00175 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 m2 #N/A #N/A

0.350 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.035 Oh #N/A #N/A
0.00175 Oh #N/A #N/A

#N/A #N/A #N/A

11.500 m' #N/A #N/A

1.200 Oh #N/A #N/A


1.200 Oh #N/A #N/A
0.012 Oh #N/A #N/A
0.0006 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A


0.020 Kg #N/A #N/A
0.0018 m3 #N/A #N/A

0.100 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0005 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A


0.020 Kg #N/A #N/A
0.0018 m3 #N/A #N/A

0.100 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0005 Oh #N/A #N/A
#N/A #N/A #N/A

1.100 m2 #N/A #N/A


0.020 Kg #N/A #N/A
0.0018 m3 #N/A #N/A

0.100 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0005 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A


0.020 Kg #N/A #N/A
0.0018 m3 #N/A #N/A

0.100 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0005 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A


0.020 Kg #N/A #N/A
0.0250 m2 #N/A #N/A

0.200 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.0010 Oh #N/A #N/A

#N/A #N/A #N/A

0.500 Lbr 49,500.00 24,750.00


0.015 Kg #N/A #N/A
0.0096 m3 #N/A #N/A
0.2500 Kg #N/A #N/A

0.150 Oh #N/A #N/A


0.400 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.00125 Oh #N/A #N/A
#N/A #N/A #N/A

0.500 Lbr 49,500.00 24,750.00


0.015 Kg #N/A #N/A
0.0190 m3 #N/A #N/A
0.3000 Kg #N/A #N/A

0.040 Oh #N/A #N/A


0.400 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.00125 Oh #N/A #N/A

#N/A #N/A #N/A

0.300 Lbr 49,500.00 14,850.00


0.100 Kg #N/A #N/A
0.0190 m3 #N/A #N/A
0.5000 Kg #N/A #N/A

0.150 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.00125 Oh #N/A #N/A

#N/A #N/A #N/A

0.300 Lbr #N/A #N/A


0.100 Kg #N/A #N/A
0.0190 m3 #N/A #N/A
0.5000 Kg #N/A #N/A

0.150 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.00125 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.060 Oh #N/A #N/A


0.600 Oh #N/A #N/A
0.060 Oh #N/A #N/A
0.003 Oh #N/A #N/A
#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.010 Oh #N/A #N/A


0.500 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.005 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.005 Oh #N/A #N/A


0.500 Oh #N/A #N/A
0.005 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.005 Oh #N/A #N/A


0.500 Oh #N/A #N/A
0.005 Oh #N/A #N/A
0.00025 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.015 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.00075 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.010 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.00050 Oh #N/A #N/A
#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.020 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.01000 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.015 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.00075 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.015 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.00075 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.050 Oh #N/A #N/A


0.500 Oh #N/A #N/A
0.050 Oh #N/A #N/A
0.00250 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.020 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.020 Oh #N/A #N/A
0.001 Oh #N/A #N/A
#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.050 Oh #N/A #N/A


0.500 Oh #N/A #N/A
0.050 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.010 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.010 Oh #N/A #N/A
0.0005 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.060 Oh #N/A #N/A


0.600 Oh #N/A #N/A
0.060 Oh #N/A #N/A
0.0030 Oh #N/A #N/A

#N/A #N/A #N/A

1.000 Bh #N/A #N/A

0.025 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.025 Oh #N/A #N/A
0.00125 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A

0.015 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.00075 Oh #N/A #N/A
#N/A #N/A #N/A

1.100 m2 #N/A #N/A

0.015 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.015 Oh #N/A #N/A
0.00075 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A

0.0165 Oh #N/A #N/A


0.165 Oh #N/A #N/A
0.0165 Oh #N/A #N/A
0.00080 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A

0.0250 Oh #N/A #N/A


0.250 Oh #N/A #N/A
0.0250 Oh #N/A #N/A
0.00125 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A

0.0150 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.0150 Oh #N/A #N/A
0.00075 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A

0.0150 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.0150 Oh #N/A #N/A
0.00075 Oh #N/A #N/A
#N/A #N/A #N/A

1.100 m2 #N/A #N/A

0.0165 Oh #N/A #N/A


0.165 Oh #N/A #N/A
0.0165 Oh #N/A #N/A
0.00080 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A

0.0150 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.0150 Oh #N/A #N/A
0.00075 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A

0.0150 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.0150 Oh #N/A #N/A
0.00075 Oh #N/A #N/A

#N/A #N/A #N/A

6.630 bh #N/A #N/A


9.800 Kg #N/A #N/A
0.0215 m3 49,500.00 1,064.25

0.2500 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

11.870 bh #N/A #N/A


10.000 Kg #N/A #N/A
0.0215 m3 49,500.00 1,064.25

0.2600 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.0125 Oh #N/A #N/A
0.0130 Oh #N/A #N/A

#N/A #N/A #N/A

26.500 bh #N/A #N/A


10.400 Kg #N/A #N/A
0.0135 m3 49,500.00 668.25

0.2700 Oh #N/A #N/A


0.130 Oh #N/A #N/A
0.0130 Oh #N/A #N/A
0.0135 Oh #N/A #N/A

#N/A #N/A #N/A

6.630 bh #N/A #N/A


8.160 Kg #N/A #N/A
0.0230 m3 49,500.00 1,138.50
0.9000 Kg 49,500.00 44,550.00

0.2500 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

11.870 bh #N/A #N/A


8.360 Kg #N/A #N/A
0.0230 m3 49,500.00 1,138.50
0.9000 Kg 49,500.00 44,550.00

0.2500 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0125 Oh #N/A #N/A
#N/A #N/A #N/A

26.500 bh #N/A #N/A


8.760 Kg #N/A #N/A
0.0230 m3 49,500.00 1,138.50
0.9000 Kg 49,500.00 44,550.00

0.2700 Oh #N/A #N/A


0.130 Oh #N/A #N/A
0.0130 Oh #N/A #N/A
0.0135 Oh #N/A #N/A

#N/A #N/A #N/A

6.250 bh #N/A #N/A


8.800 Kg #N/A #N/A
0.0215 m3 49,500.00 1,064.25
0.9000 Kg 49,500.00 44,550.00

0.2500 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

1.870 bh #N/A #N/A


10.000 Kg #N/A #N/A
0.0215 m3 49,500.00 1,064.25
1.5400 Kg 49,500.00 76,230.00

0.2600 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.0125 Oh #N/A #N/A
0.0130 Oh #N/A #N/A

#N/A #N/A #N/A

6.930 bh #N/A #N/A


9.800 Kg #N/A #N/A
0.0215 m3 49,500.00 1,064.25
1.3000 Kg 49,500.00 64,350.00

0.2500 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0125 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

11.870 bh #N/A #N/A


10.000 Kg #N/A #N/A
0.0215 m3 49,500.00 1,064.25
1.5000 Kg 49,500.00 74,250.00

0.2600 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.0125 Oh #N/A #N/A
0.0130 Oh #N/A #N/A

#N/A #N/A #N/A

6.250 bh #N/A #N/A


8.800 Kg #N/A #N/A
0.0215 m3 49,500.00 1,064.25
1.3000 Kg 49,500.00 64,350.00

0.2500 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

11.807 bh #N/A #N/A


10.000 Kg #N/A #N/A
0.0215 m3 49,500.00 1,064.25
1.1250 Kg 49,500.00 55,687.50

0.2500 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

5.600 bh #N/A #N/A


8.190 Kg #N/A #N/A
0.0450 m3 49,500.00 2,227.50
1.0000 Kg 49,500.00 49,500.00

0.2500 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0125 Oh #N/A #N/A

#N/A #N/A #N/A

6.250 bh #N/A #N/A


8.800 Kg #N/A #N/A
0.0215 m3 49,500.00 1,064.25
1.3000 Kg 49,500.00 64,350.00

0.6720 Oh #N/A #N/A


0.224 Oh #N/A #N/A
0.0220 Oh #N/A #N/A
0.0340 Oh #N/A #N/A

#N/A #N/A #N/A

11.870 bh #N/A #N/A


10.000 Kg #N/A #N/A
0.0215 m3 49,500.00 1,064.25
1.5000 Kg 49,500.00 74,250.00

0.7000 Oh #N/A #N/A


0.340 Oh #N/A #N/A
0.0340 Oh #N/A #N/A
0.0350 Oh #N/A #N/A

#N/A #N/A #N/A

5.300 bh #N/A #N/A


1.560 Kg #N/A #N/A
0.0040 m3 49,500.00 198.00

0.0600 Oh #N/A #N/A


0.030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A

#N/A #N/A #N/A

3.530 bh #N/A #N/A


1.560 Kg #N/A #N/A
0.0030 m3 49,500.00 148.50

0.0600 Oh #N/A #N/A


0.030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A

#N/A #N/A #N/A

2.650 bh #N/A #N/A


1.560 Kg #N/A #N/A
0.0030 m3 49,500.00 148.50

0.0600 Oh #N/A #N/A


0.030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A

#N/A #N/A #N/A

5.300 bh #N/A #N/A


1.200 Kg #N/A #N/A
0.0030 m3 49,500.00 148.50
0.1900 Kg #N/A #N/A

0.0600 Oh #N/A #N/A


0.030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A
#N/A #N/A #N/A

3.330 bh #N/A #N/A


1.650 Kg #N/A #N/A
0.0032 m3 49,500.00 158.40
0.1000 Kg #N/A #N/A

0.0600 Oh #N/A #N/A


0.030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A

#N/A #N/A #N/A

2.650 bh #N/A #N/A


1.200 Kg #N/A #N/A
0.0030 m3 49,500.00 148.50
0.1000 Kg #N/A #N/A

0.0800 Oh #N/A #N/A


0.040 Oh #N/A #N/A
0.0040 Oh #N/A #N/A
0.0040 Oh #N/A #N/A

#N/A #N/A #N/A

3.530 bh #N/A #N/A


1.560 Kg #N/A #N/A
0.0030 m3 49,500.00 148.50
0.1900 Kg #N/A #N/A

0.0800 Oh #N/A #N/A


0.040 Oh #N/A #N/A
0.0040 Oh #N/A #N/A
0.0040 Oh #N/A #N/A

#N/A #N/A #N/A

2.650 bh #N/A #N/A


1.200 Kg #N/A #N/A
0.0030 m3 49,500.00 148.50
0.1000 Kg #N/A #N/A
0.0800 Oh #N/A #N/A
0.040 Oh #N/A #N/A
0.0040 Oh #N/A #N/A
0.0040 Oh #N/A #N/A

#N/A #N/A #N/A

2.650 bh #N/A #N/A


1.200 Kg #N/A #N/A
0.0030 m3 49,500.00 148.50
0.1000 Kg #N/A #N/A

0.0600 Oh #N/A #N/A


0.030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A
0.0030 Oh #N/A #N/A

#N/A #N/A #N/A

3.330 bh #N/A #N/A


1.650 Kg #N/A #N/A
0.0032 m3 49,500.00 158.40
0.1000 Kg #N/A #N/A

0.9000 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0045 Oh #N/A #N/A

#N/A #N/A #N/A

2.500 bh #N/A #N/A


1.650 Kg #N/A #N/A
0.0032 m3 49,500.00 158.40
0.1000 Kg #N/A #N/A

0.9000 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0045 Oh #N/A #N/A
#N/A #N/A #N/A

3.330 bh #N/A #N/A


1.650 Kg #N/A #N/A
0.0032 m3 49,500.00 158.40
0.1000 Kg #N/A #N/A

0.9000 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0045 Oh #N/A #N/A

#N/A #N/A #N/A

1.700 bh #N/A #N/A


1.650 Kg #N/A #N/A
0.0032 m3 49,500.00 158.40
0.1000 Kg #N/A #N/A

0.9000 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0045 Oh #N/A #N/A

#N/A #N/A #N/A

2.500 bh #N/A #N/A


1.650 Kg #N/A #N/A
0.0032 m3 49,500.00 158.40
0.1000 Kg #N/A #N/A

0.9000 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0045 Oh #N/A #N/A

#N/A #N/A #N/A

3.330 bh #N/A #N/A


1.650 Kg #N/A #N/A
0.0032 m3 49,500.00 158.40
0.1000 Kg #N/A #N/A

0.9000 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0045 Oh #N/A #N/A

#N/A #N/A #N/A

0.0036 m3 #N/A #N/A

0.9000 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0045 Oh #N/A #N/A

#N/A #N/A #N/A

0.0036 m3 #N/A #N/A

0.9000 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0045 Oh #N/A #N/A

#N/A #N/A #N/A

1.0500 m2 #N/A #N/A


14.1400 Kg #N/A #N/A
0.0400 m3 49,500.00 1,980.00

0.2700 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.0150 Oh #N/A #N/A
0.0135 Oh #N/A #N/A

#N/A #N/A #N/A

5.0000 bh #N/A #N/A


11.3800 Kg #N/A #N/A
0.0420 m3 49,500.00 2,079.00
1.5000 Kg 49,500.00 74,250.00

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

5.000 bh #N/A #N/A


1.650 Kg #N/A #N/A
0.0032 m3 49,500.00 158.40
0.1000 Kg #N/A #N/A

0.0900 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0045 Oh #N/A #N/A

#N/A #N/A #N/A

5.000 bh #N/A #N/A


1.650 Kg #N/A #N/A
0.0032 m3 49,500.00 158.40
0.1200 Kg #N/A #N/A

0.0900 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0045 Oh #N/A #N/A

#N/A #N/A #N/A

5.000 bh #N/A #N/A


0.850 Kg #N/A #N/A
0.0022 m3 49,500.00 108.90
0.0800 Kg #N/A #N/A

0.0900 Oh #N/A #N/A


0.090 Oh #N/A #N/A
0.0090 Oh #N/A #N/A
0.0045 Oh #N/A #N/A

#N/A #N/A #N/A

3.500 bh #N/A #N/A


0.080 Kg 49,500.00 3,960.00

0.0800 Oh #N/A #N/A


0.080 Oh #N/A #N/A
0.0080 Oh #N/A #N/A
0.0040 Oh #N/A #N/A

#N/A #N/A #N/A

50.000 bh #N/A #N/A


11.380 Kg #N/A #N/A
0.042 m3 49,500.00 2,079.00
1.500 Kg 49,500.00 74,250.00

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

44.000 bh #N/A #N/A


11.380 Kg #N/A #N/A
0.042 m3 49,500.00 2,079.00
1.500 Kg 49,500.00 74,250.00

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

25.000 bh #N/A #N/A


11.380 Kg #N/A #N/A
0.042 m3 49,500.00 2,079.00
1.500 Kg 49,500.00 74,250.00

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

16.000 bh #N/A #N/A


11.380 Kg #N/A #N/A
0.042 m3 49,500.00 2,079.00
1.500 Kg 49,500.00 74,250.00

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

35.000 bh #N/A #N/A


11.380 Kg #N/A #N/A
0.042 m3 49,500.00 2,079.00
1.500 Kg 49,500.00 74,250.00

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

10.000 bh #N/A #N/A


11.380 Kg #N/A #N/A
0.042 m3 49,500.00 2,079.00
1.500 Kg 49,500.00 74,250.00

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

10.000 bh #N/A #N/A


11.380 Kg #N/A #N/A
0.042 m3 49,500.00 2,079.00
1.500 Kg 49,500.00 74,250.00

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

33.000 bh #N/A #N/A


11.380 Kg #N/A #N/A
0.042 m3 49,500.00 2,079.00
1.500 Kg 49,500.00 74,250.00

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

12.000 bh #N/A #N/A


14.150 Kg #N/A #N/A
0.039 m3 49,500.00 1,930.50
2.000 Kg 49,500.00 99,000.00

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

1.052 M2 #N/A #N/A


14.150 Kg #N/A #N/A
0.039 m3 49,500.00 1,930.50
2.000 Kg 49,500.00 99,000.00

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m2 #N/A #N/A


0.350 Kg 49,500.00 17,325.00

0.1700 Oh #N/A #N/A


0.170 Oh #N/A #N/A
0.0170 Oh #N/A #N/A
0.0085 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m2 #N/A #N/A


0.350 Kg 49,500.00 17,325.00

0.1700 Oh #N/A #N/A


0.170 Oh #N/A #N/A
0.0170 Oh #N/A #N/A
0.0085 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m2 #N/A #N/A

0.1200 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0060 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m2 #N/A #N/A


0.350 Kg 49,500.00 17,325.00
0.1700 Oh #N/A #N/A
0.170 Oh #N/A #N/A
0.0170 Oh #N/A #N/A
0.0085 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 m2 #N/A #N/A


0.600 Kg 49,500.00 29,700.00

0.6500 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0325 Oh #N/A #N/A

#N/A #N/A #N/A

83.000 Bh #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6200 Oh #N/A #N/A


0.500 Oh #N/A #N/A
0.0500 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

83.000 Bh #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6200 Oh #N/A #N/A


0.500 Oh #N/A #N/A
0.0500 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A


45.000 Bh #N/A #N/A
9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6000 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.0450 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

45.000 Bh #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6000 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.0450 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

50.000 Bh #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6000 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.0450 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

25.000 Bh #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6000 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.0450 Oh #N/A #N/A
0.0300 Oh #N/A #N/A
#N/A #N/A #N/A

100.000 Bh #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6000 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.0450 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

100.000 Bh #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6000 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.0450 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

50.000 Bh #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6000 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.0450 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

45.000 Bh #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6000 Oh #N/A #N/A


0.450 Oh #N/A #N/A
0.0450 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

25.000 Bh #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6000 Oh #N/A #N/A


0.100 Oh #N/A #N/A
0.0450 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

50.000 Bh #N/A #N/A


9.300 Kg #N/A #N/A
0.018 m3 49,500.00 891.00
1.500 Kg 49,500.00 74,250.00

0.6000 Oh #N/A #N/A


0.125 Oh #N/A #N/A
0.0125 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

1.020 M2 #N/A #N/A


12.440 Kg #N/A #N/A
0.025 m3 49,500.00 1,237.50
1.500 Kg 49,500.00 74,250.00

0.7200 Oh #N/A #N/A


0.650 Oh #N/A #N/A
0.0650 Oh #N/A #N/A
0.0350 Oh #N/A #N/A

#N/A #N/A #N/A

80.000 Bh #N/A #N/A


12.440 Kg #N/A #N/A
0.025 m3 49,500.00 1,237.50

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 Bh #N/A #N/A


11.750 Kg #N/A #N/A
0.035 m3 49,500.00 1,732.50

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

1.050 Bh #N/A #N/A


11.750 Kg #N/A #N/A
0.035 m3 49,500.00 1,732.50

0.6200 Oh #N/A #N/A


0.350 Oh #N/A #N/A
0.0350 Oh #N/A #N/A
0.0300 Oh #N/A #N/A

#N/A #N/A #N/A

11.050 Bh #N/A #N/A


0.350 Kg #N/A #N/A

0.1500 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.0150 Oh #N/A #N/A
0.0075 Oh #N/A #N/A

#N/A #N/A #N/A

11.050 Bh #N/A #N/A


0.350 Kg #N/A #N/A

0.1500 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.0150 Oh #N/A #N/A
0.0075 Oh #N/A #N/A

#N/A #N/A #N/A

11.050 Bh #N/A #N/A


0.350 Kg #N/A #N/A

0.1500 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.0150 Oh #N/A #N/A
0.0075 Oh #N/A #N/A

#N/A #N/A #N/A

11.050 Bh #N/A #N/A


0.350 Kg #N/A #N/A

0.1500 Oh #N/A #N/A


0.150 Oh #N/A #N/A
0.0150 Oh #N/A #N/A
0.0075 Oh #N/A #N/A

#N/A #N/A #N/A

1.100 m2 #N/A #N/A


0.250 Kg #N/A #N/A

0.7500 Oh #N/A #N/A


0.170 Oh #N/A #N/A
0.0170 Oh #N/A #N/A
0.0085 Oh #N/A #N/A

#N/A #N/A #N/A

3.000 Kg #N/A #N/A

0.1200 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0060 Oh #N/A #N/A

#N/A #N/A #N/A


5.000 Kg #N/A #N/A

0.1200 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0060 Oh #N/A #N/A

#N/A #N/A #N/A

0.002 m3 #N/A #N/A


0.050 Kg 49,500.00 2,475.00

0.1200 Oh #N/A #N/A


0.120 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0060 Oh #N/A #N/A

#N/A #N/A #N/A

0.050 Kg #N/A #N/A

0.1500 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

0.050 Kg #N/A #N/A

0.1500 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

0.050 Kg #N/A #N/A

0.1500 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.0025 Oh #N/A #N/A
#N/A #N/A #N/A

0.050 Kg #N/A #N/A

0.1500 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

40.000 Kg #N/A #N/A


10.000 Ltr #N/A #N/A

sewa / Hr

1.6000 Oh #N/A #N/A


1.600 Oh #N/A #N/A
0.8000 Oh #N/A #N/A
0.5000 Oh #N/A #N/A

#N/A #N/A #N/A

0.080 Kg #N/A #N/A


0.020 Kg #N/A #N/A
0.010 Kg #N/A #N/A

0.0400 Oh #N/A #N/A


0.040 Oh #N/A #N/A
0.0040 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

0.150 Kg #N/A #N/A


0.170 Kg #N/A #N/A
0.170 Kg #N/A #N/A

0.0700 Oh #N/A #N/A


0.075 Oh #N/A #N/A
0.0075 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A


0.200 Kg #N/A #N/A
0.150 Kg #N/A #N/A
0.170 Kg #N/A #N/A
0.260 Kg 49,500.00 12,870.00

0.0700 Oh #N/A #N/A


0.009 Oh #N/A #N/A
0.0060 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

0.200 Kg #N/A #N/A


0.150 Kg #N/A #N/A
0.170 Kg #N/A #N/A
0.350 Kg 49,500.00 17,325.00

0.0700 Oh #N/A #N/A


0.105 Oh #N/A #N/A
0.0040 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

0.200 Kg #N/A #N/A


0.150 Kg #N/A #N/A
0.170 Kg #N/A #N/A
0.350 Kg 49,500.00 17,325.00

0.0700 Oh #N/A #N/A


0.105 Oh #N/A #N/A
0.0040 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

0.360 Ltr #N/A #N/A

0.0400 Oh #N/A #N/A


0.063 Oh #N/A #N/A
0.0630 Oh #N/A #N/A
0.0025 Oh #N/A #N/A
#N/A #N/A #N/A

0.150 Ltr #N/A #N/A


0.372 Ltr #N/A #N/A
2.000 Lbr #N/A #N/A

0.0400 Oh #N/A #N/A


0.063 Oh #N/A #N/A
0.0630 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

0.350 Ltr #N/A #N/A

0.1000 Oh #N/A #N/A


- Oh #N/A #N/A
- Oh #N/A #N/A
0.0060 Oh #N/A #N/A

#N/A #N/A #N/A

0.150 Ltr #N/A #N/A


0.050 Kg #N/A #N/A
0.100 Lbr #N/A #N/A
0.010 Bh #N/A #N/A

0.1600 Oh #N/A #N/A


0.160 Oh #N/A #N/A
0.0160 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

0.100 Kg #N/A #N/A


0.100 Kg #N/A #N/A
0.260 Kg 49,500.00 12,870.00

0.0200 Oh #N/A #N/A


0.063 Oh #N/A #N/A
0.0063 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A


0.100 Lbr #N/A #N/A
0.250 ikat #N/A #N/A
0.002 m3 #N/A #N/A
0.150 Kg #N/A #N/A

0.1500 Oh #N/A #N/A


0.001 Oh #N/A #N/A
0.0001 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

0.002 m3 #N/A #N/A


0.300 Kg #N/A #N/A

0.0400 Oh #N/A #N/A


0.005 Oh #N/A #N/A
0.0005 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

1.200 m3 #N/A #N/A


0.200 Kg #N/A #N/A

0.0200 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.0020 Oh #N/A #N/A
0.0025 Oh #N/A #N/A

#N/A #N/A #N/A

0.100 Kg #N/A #N/A


0.010 Bh #N/A #N/A

0.0200 Oh #N/A #N/A


0.200 Oh #N/A #N/A
0.0200 Oh #N/A #N/A
0.0100 Oh #N/A #N/A

#N/A #N/A #N/A

0.100 Kg #N/A #N/A


0.010 Bh #N/A #N/A
0.002 m3 #N/A #N/A

0.2500 Oh #N/A #N/A


0.225 Oh #N/A #N/A
0.0225 Oh #N/A #N/A
0.0075 Oh #N/A #N/A

#N/A #N/A #N/A

0.100 Kg #N/A #N/A


0.100 Kg #N/A #N/A
0.040 Kg #N/A #N/A
0.040 Kg #N/A #N/A
0.010 Ltr #N/A #N/A
0.002 m3 #N/A #N/A

0.0060 Oh #N/A #N/A


0.006 Oh #N/A #N/A
0.0225 Oh #N/A #N/A
0.0075 Oh #N/A #N/A

14,850.00 #N/A #N/A

0.300 Kg 49,500.00 14,850.00

0.0060 Oh #N/A #N/A


0.060 Oh #N/A #N/A
0.0120 Oh #N/A #N/A
0.0060 Oh #N/A #N/A

#N/A #N/A #N/A

0.110 Kg #N/A #N/A


0.170 Kg #N/A #N/A
0.080 Kg #N/A #N/A

0.5000 Oh #N/A #N/A


0.800 Oh #N/A #N/A
0.3000 Oh #N/A #N/A
0.2000 Oh #N/A #N/A

#N/A #N/A #N/A

0.300 Kg #N/A #N/A


0.4000 Oh #N/A #N/A
0.700 Oh #N/A #N/A
0.2000 Oh #N/A #N/A
0.2000 Oh #N/A #N/A
ANALISA
PRO
RUAS JAGAKARSA - PA
PT

I. PEKERJAAN PERSIAPAN
1) 1 M2 PEKERJAAN PEMBERSIHAN LOKASI
Produktivitas : 219.21

0.0007 Hari

0.033 OH
0.022 OH
0.002 OH

2) 1 M' PEKERJAAN PENGUKURAN DAN PEMASANGAN PATOK

0.0045 unit
1 ls

0.007 OH
0.07 OH

0.012 m3
0.02 kg
0.007 m3

0.1 OH
0.1 OH
0.01 OH
0.005 OH

3) 1 M' PEKERJAAN PEMAGARAN BASECAMP


1.1 lbr
0.006 m3
0.05 kg

0.286 OH
0.571 OH
0.029 OH
0.014 OH

4) 1 UNIT PAPAN NAMA PROYEK

0.025 lbr
0.02275 m3
8 m'
0.08 kg
0.05 zak
0.1 m3
0.5 kg
0.5 bh

0.83 OH
1.66 OH
0.083 OH
0.0415 OH

5) 1 M2 DIREKSI KEET

0.100 zak
0.200 kg
0.670 lbr
0.100 kg
0.080 m3
0.500 lbr
1.000 m²
0.083 daun
70 bh
0.100 kg
0.056 unit
0.028 bh
0.028 bh
0.028 bh
0.222 bh
0.042 bh
0.042 bh
0.042 unit
0.056 bh
0.139 bln
0.014 unit
0.014 bh
0.167 bh
0.167 bh
0.167 bh
0.167 bh

0.0625 OH
0.0625 OH
0.250 OH
0.0625 OH
0.031 OH
0.500 OH

6) 1 M2 POS KEAMANAN

0.05 m³
0.125 kg
0.335 lbr
0.75 lbr
0.05 zak
0.1 m³
35 bh

0.025 OH
0.01 OH
0.1 OH
0.9 OH
7) 1 M2 GUDANG PENYIMPANAN MATERIAL

1.7 btg
0.21 m3
0.3 kg
0.21 kg
0.03 m3
0.05 m3
1.5 lbr

0.05 OH
0.2 OH
2 OH
1 OH

8) 1 M2 BEDENG

0.1 zak
0.2 m3
0.67 lbr
100 buah
0.1 bh
0.25 kg
0.05 m³
0.5 lbr
0.06 bh
0.06 bh

0.0625 OH
0.0625 OH
0.250 OH
0.500 OH

9) 1 M2 BENGKEL KERJA
1.25 btg
0.186 m3
0.3 kg
0.36 zak
0.03 m3
0.05 m3
1 lbr

0.05 OH
0.12 OH
1.2 OH
1 OH

10) 1 Ls PENGUJIAN BAHAN

4,400 buah
4,400 buah
4,400 buah
10 Ls
10 Ls

11) 1 Ls DOKUMENTASI PROYEK

1 unit

1 orang

12) 1 UNIT PENGADAAN AIR BERSIH

1 unit
1 unit
3 btg
1 unit
1 set
1.80 OH
0.20 OH
0.02 OH
0.05 OH

13) 1 UNIT PENGADAAN LISTRIK KERJA

1 unit
10 bulan
30 m

1 OH

14) 1 UNIT PENGADAAN TELEPON

1 unit
0.2 unit

0.2 OH

15) 1 UNIT PENGADAAN PENERANGAN

1 unit

10 bulan

1 OH
2 OH
16) 1 UNIT PENYEDIAAN P3K

1 unit

16) 1 M2 MUSHOLA

0.382 lbr
0.006 m3
0.67 lbr
0.1 unit
0.05 kg

0.83 OH
1.66 OH
0.083 OH
0.083 OH

17) 1 Ls MOBILISASI DAN DEMOBILISASI

8 buah
4 buah
3 buah
2 buah
4 buah
1 buah
1 buah
2 buah
2 buah
2 buah
1 buah
1 buah
ANALISA HARGA SATUAN PEKE
PROYEK JALAN TOL JORR
RUAS JAGAKARSA - PASAR MINGGU Sta. (0+00
PT. RPA CONSTRUCTION

EMBERSIHAN LOKASI
m2/jam

Alat : Harga
BULLDOZER D3B CATERPILLAR 10,500,000

Upah :
Operator 85,000
Pembantu Operator 65,000
Mandor 85,000

HSP PEMBERSIHAN LOKASI =

ENGUKURAN DAN PEMASANGAN PATOK

Alat : Harga
Sewa Theodolite 15,000,000
Sewa Alat Ukur 1,500,000

Upah :
Surveyor 75,000
Asisten Surveyor 65,000

Bahan :
Kaso kayu kamper samarinda oven uk. 5 x 7 x 400 cm 3,089,625
Paku uk 5 cm 3,870
Papan kayu kamper samarinda oven uk. 3 x 20 x 400 cm 5,617,500

Upah :
Tukang kayu 65,000
Pekerja 55,000
Kepala tukang kayu 75,000
Mandor 85,000

HSP PENGUKURAN DAN PEMASANGAN PATOK =

EMAGARAN BASECAMP
Bahan : Harga
Plat seng tebal 0.025 cm lebar 0.9 26,250
Kaso kayu kamper samarinda oven uk. 5 x 7 x 400 cm 3,089,625
Paku Seng 177,000

Upah :
Tukang Kayu 65,000
Perkerja 55,000
Kepala Tukang 75,000
Mandor 85,000

HSP PEMAGARAN BASE CAMP =

A PROYEK

Bahan : Harga
Seng Plat BJLS 32 L = 0,90 M 70,000
Kaso kayu kamper samarinda oven uk. 5 x 7 x 400 cm 3,089,625
Pipa Galvanis Dia 2,0" 56,600
Paku Seng 4,700
Semen Holcim 50 kg 53,500
Pasir pasang 185,000
Cat kayu/besi KUDA TERBANG 45,250
Kuas no. 3 13,984

Upah:
Tukang kayu 65,000
Pekerja 55,000
Kepala tukang kayu 75,000
Mandor 85,000

HSP PAPAN NAMA PROYEK =

Bahan: Harga
Semen Holcim 50 kg 53,500
Pasir pasang 185,000
Plat Asbes 100 x 100 tebal 6 mm 14,300
Paku asbes 12,300
Balok kayu kamper samarinda oven uk. 6 x 12 x 400 cm 3,887,310
Triplek ukr. 122 x 244 x 4 mm 47,000
Ubin Keramik Ukr. 20x20 Standar KW 2 32,200
Kaca nako lengkap tralis 157,755
Bata merah 350
Paku uk. 3 cm 18,000
Kusen dan Daun Pintu PVC ukuran standar 152,700
Bidet Toto Type BW 5J W&PIV 859,950
Bak mandi lokal fiber 150,000
Meja Rapat Daiko 1,050,500
Kursi Lipat Chitose Tipe Yasuka SL 220,000
Meja Kerja uk. 1.5 x 0.8 m 818,400
Filling Cabinet Elite B4-4 08 DX 2,746,000
HP Presario CQ3622L 5,235,000
AC split LG Plasma 1 pk 3,821,000
Sewa Mesin Fotocopy Canon IC MF 4350d 500,000
Fax Panasonic KXTS 505 120,000
Whiteboard Daiko Double Face 90 x 120 cm 896,000
Helm Proyek 15,000
Jas Hujan 150,000
Sepatu Proyek 70,500
Payung 20,000

Upah:
Mandor 85,000
Kepala tukang kayu 75,000
Tukang kayu 65,000
Instalator 75,000
Pembantu Instalator 65,000
Pekerja 55,000

HSP DIREKSI KEET =

Bahan: Harga
Kaso kayu Meranti Jambi/Palembang ukr. 4 x 6 , 5 x 7 x 400 2,283,300
Paku uk. 3 cm 18,000
Plat Asbes 100 x 100 tebal 5 mm 12,300
Triplek ukr. 122 x 244 x 3 mm 37,000
Semen Holcim 50 kg 54,000
Pasir pasang 185,000
Bata merah 350

Upah:
Mandor 85,000
Kepala tukang kayu 75,000
Tukang kayu setengah terampil 50,000
Pekerja 55,000
HSP POS KEAMANAN =

YIMPANAN MATERIAL

Bahan: Harga
Dolken Ø 5 - 7 cm ukr. 300 - 400 cm 15,500
Triplek ukr. 122 x 244 x 3 mm 37,000
Paku uk. 3 cm 18,000
Semen Holcim 50 kg 54,000
Pasir Beton 177,000
Batu Pecah/Split ukr. 2 - 3 cm 174,300
Plat Asbes 100 x 100 tebal 5 mm 12,300

Upah:
Mandor 85,000
Kepala tukang kayu 75,000
Tukang kayu 65,000
Pekerja 55,000

HSP GUDANG =

Bahan: Harga
Semen Holcim 50 kg 54,000
Pasir pasang 185,000
Plat Asbes 100 x 100 tebal 5 mm 12,300
Bata merah 350
Paku asbes 12,300
Paku uk. 3 cm 18,000
Balok Kayu Meranti Jambi/palembang ukuran 6/8 x 12/15 x 400 2,453,200
Triplek ukr. 122 x 244 x 3 mm 37,000
Colset Jongkok Merk Toto Tipe Standar 323,700
Ember 30,000

Upah:
Mandor 85,000
Kepala tukang kayu 85,000
Tukang kayu 60,000
Pekerja 45,000

HSP BEDENG =
Bahan : Harga
Dolken Ø 5 - 7 cm ukr. 350 - 400 cm 15,750
Kaso kayu kamper samarinda oven uk. 5 x 7 x 400 cm 3,089,625
Paku uk 7 cm 6,450
Semen Holcim 50 kg 53,500
Pasir Beton 177,000
Split 185,000
Seng gelombang 180 x 90 x 0.025 50,000

Upah :
Mandor 85,000
Kepala tukang kayu 85,000
Tukang kayu 60,000
Pekerja 45,000

HSP BENGKEL KERJA =

Sand Cone 60,000


Kubus Beton 15,000
Core Drill 25,000
Aspal 250,000
Aggregate 250,000

HSP PENGUJIAN BAHAN =

SI PROYEK

Alat : Harga
SONY CyberShot DSC-W310 (black) 1,640,000.00

Upah :
Dokumentator

HSP DOKUMENTASI PROYEK =

AN AIR BERSIH

Alat : Harga
Pompa Air Jet Pump Panasonic GN - 205HX 1,210,000.00
Sumur 1,500,000.00
Pipa PVC dia 1 1/2" 24,750.00
Tangki Air Fiber 1 m3 bulat 950,000.00
Sambungan + Kran 500,000.00
Upah :
Tukang gali tanah 65,000.00
Tukang Pipa 65,000.00
Kepala Tukang Pipa 60,000.00
Mandor 85,000.00

HSP PENGADAAN AIR BERSIH =


AN LISTRIK KERJA

Alat : Harga
Paket Instalasi Listrik Kabel 20 KWh 10,000,000.00
Iuran per bulan 7,000,000.00
Kabel NYA 1 x 2,5 mm2 4,492.00

Upah :
Instalator 75,000.00

HSP PENGADAAN LISTRIK KERJA =

AN TELEPON

Alat : Harga
Wifone LG LSP - 400 299,000.00
Tunner Wireless WTU - 770 1,890,000.00

Upah :
Instalator 75,000.00

HSP TELEPON =

AN PENERANGAN

Alat : Harga
Paket Instalasi Listrik Kabel 10 KWh 5,000,000.00
NYA 1 x 1.25 mm2 + pipa PVC, Kabel tiap titik
saklar / stop kontak
Iuran per bulan 3,500,000.00

Upah :
Instalator 75,000.00
Pembantu Instalator 65,000.00

HSP PENGADAAN PENERANGAN =


Alat : Harga
Kotak P3K 350,000.00

HSP PENYEDIAAN P3K =

Bahan : Harga
Triplek ukr. 122 x 244 x 4 mm 47,000.00
Balok kayu kamper samarinda oven uk. 6 x 12 x 400 cm 3,887,310.00
Seng gelombang 180 x 90 x 0.2 36,000.00
Paku Seng 4,700.00
Paku uk 5 cm 3,870.00

Upah :
Tukang kayu 65,000.00
Pekerja 55,000.00
Kepala tukang kayu 75,000.00
Mandor 85,000.00

HSP MUSHOLA =

AN DEMOBILISASI

BULLDOZER D3B CATERPILLAR 4,000,000


EXCAVATOR KOBELCO SK-024 4,000,000
WHEEL LOADER 1.0-1.6 M3 4,000,000
MOTOR GRADER >100 HP 4,000,000
TANDEM ROLLER 6-8 T. 2,000,000
SLIP FORM PAVER 4,000,000
ASPHALT FINISHER 4,000,000
TIRE ROLLER 8-10 T. 2,000,000
TRUCK CRANE 20 TON 2,000,000
BARRIER LIFT 4,000,000
ROAD MARKING MACHINE 2,000,000
BORE PILE MACHINE 4,000,000

HSP MOBILISASI DAN DEMOBILISASI =


GA SATUAN PEKERJAAN
K JALAN TOL JORR
R MINGGU Sta. (0+000) – Sta. (5+496.435)
A CONSTRUCTION

Harga Jadi
6,842.68

2,769.66
1,411.98
138.48

Rp 11,162.81 /m2

Harga Jadi
68,219.03
1,500,000.00

525.00
4,550.00

37,075.50
77.40
39,322.50

6,500.00
5,500.00
750.00
425.00

Rp 7,562.96 /m'
Harga Jadi
28,875.00
18,537.75
8,850.00

18,571.43
31,428.57
2,142.86
1,214.29

Rp 109,619.89 /m'

Harga Jadi
1,750.00
70,288.97
452,800.00
376.00
2,675.00
18,500.00
22,625.00
6,992.00

53,950.00
91,300.00
6,225.00
3,527.50

Rp 731,009.47 /unit

Harga Jadi
5,350.00
37,000.00
9,581.00
1,230.00
310,984.80
23,500.00
32,200.00
13,093.67
24,500.00
1,800.00
8,483.33
23,887.50
4,166.67
29,180.56
48,888.89
34,100.00
114,416.67
218,125.00
212,277.78
69,444.44
1,666.67
12,444.44
2,500.00
25,000.00
11,750.00
3,333.33

5,312.50 1.25
4,687.50 1.25
16,250.00 5
4,687.50 1.25
2,031.25 0.625
27,500.00 10
19.375
Rp 1,339,373.49 /m2

Harga Jadi
114,165.00
2,250.00
4,120.50
27,750.00
2,700.00
18,500.00
12,250.00

2,125.00
750.00
5,000.00
49,500.00
Rp 239,110.50 /m2

Harga Jadi
26,350.00
7,770.00
5,400.00
11,340.00
5,310.00
8,715.00
18,450.00

4,250.00
15,000.00
130,000.00
55,000.00

Rp 287,585.00 /m2

Harga Jadi
5,400.00
37,000.00
8,241.00
35,000.00
1,230.00
4,500.00
122,660.00
18,500.00
17,983.33
1,666.67

5,312.50
5,312.50
15,000.00
22,500.00

Rp 300,306.00 /m2
Harga Jadi
19,687.50
574,670.25
1,935.00
19,260.00
5,310.00
9,250.00
50,000.00

4,250.00
10,200.00
72,000.00
45,000.00

Rp 811,562.75 /m2

263,987,928
65,996,982
109,994,970
2,500,000
2,500,000

Rp 444,979,880.00 /Ls

Harga Jadi
1,640,000.00

Rp 1,640,000.00 /Ls

Harga Jadi
1,210,000.00
1,500,000.00
74,250.00
950,000.00
500,000.00
117,000.00
13,000.00
1,200.00
4,250.00

Rp 4,369,700.00 /Unit

Harga Jadi
10,000,000.00
70,000,000.00
134,760.00

75,000.00

Rp 80,209,760.00 /Unit

Harga Jadi
299,000.00
378,000.00

15,000.00

Rp 692,000.00 /Unit

Harga Jadi
5,000,000.00

35,000,000.00

75,000.00
130,000.00

Rp 40,205,000.00 /Unit
Harga Jadi
350,000.00

Rp 350,000.00 /Unit

Harga Jadi
17,954.00
23,323.86
24,120.00
470.00
193.50

53,950.00
91,300.00
6,225.00
7,055.00

Rp 224,591.36 /m2

32,000,000
16,000,000
12,000,000
8,000,000
8,000,000
4,000,000
4,000,000
4,000,000
4,000,000
8,000,000
2,000,000
4,000,000

Rp 106,000,000.00 /Ls
29
5497
46
14,665,996.00 m3
1,466.60 per 1000 m3
II. PEKERJAAN TANAH
1) STRIPPING
1.1) 1 M3 STRIPING TOP SOIL
Produktivitas : 277.67 m3/jam

Alat : Harga Harga Jadi


0.0005 Hari BULLDOZER D3B CATERPILLAR 10,500,000.00 5,402.12

Upah :
0.001 OH Operator 85,000.00 43.73
0.001 OH Pembantu Operator 65,000.00 33.44

HSP STRIPING TOP SOIL= Rp 5,479.29 /m3

1.2) 1 M3 ANGKUT TANAH STRIPING


Produktivitas : 169.13 m3/jam

Alat : Harga Harga Jadi


0.0008 Hari EXCAVATOR KOBELCO SK-024 6,650,000.00 5,616.91

Upah :
0.001 OH Operator 85,000.00 71.80
0.001 OH Pembantu Operator 65,000.00 54.90

Produktivitas : 29.88 m3/jam

Alat : Harga Harga Jadi


0.0048 Hari DUMP TRUCK 10 TON 600,000.00 2,868.97

Upah :
0.005 OH Sopir / Driver 50,000.00 239.08
0.005 OH Pembantu Sopir / Driver 43,000.00 205.61

HSP STRIPING TOP SOIL= Rp 9,057.27 /m3

2) 1 M3 GALIAN TANAH
Produktivitas : 222.14 m3/jam

Alat : Harga Harga Jadi


0.0006 Hari BULLDOZER D3B CATERPILLAR 10,500,000.00 6,752.65

Upah :
0.001 OH Operator 85,000.00 54.66
0.001 OH Pembantu Operator 65,000.00 41.80

HSP GALIAN TANAH = Rp 6,849.11 /m3

3) 1 M3 PENGANGKUTAN TANAH TIMBUNAN


Produktivitas : 217.19 m3/jam

Alat : Harga Harga Jadi


0.0007 Hari WHEEL LOADER 1.0-1.6 M3 6,650,000.00 4,373.97

Upah :
0.001 OH Operator 85,000.00 55.91
0.001 OH Pembantu Operator 65,000.00 42.75

Produktivitas : 47.89 m3/jam

Alat : Harga Harga Jadi


0.0030 Hari DUMP TRUCK 26 TON 800,000.00 2,386.52

Upah :
0.003 OH Operator 85,000.00 253.57
0.003 OH Pembantu Operator 65,000.00 193.90

HSP TANAH TIMBUNAN = Rp 7,306.62 /m3

4) 1 M2 PERATAAN TANAH
Produktivitas : 2,370.06 m2/jam

Alat : Harga Harga Jadi


0.0004 jam MOTOR GRADER >100 HP 6,300,000.00 2,658.16

Upah :
0.0001 OH Operator 85,000.00 5.12
0.0001 OH Pembantu Operator 65,000.00 3.92

HSP PERATAAN TANAH = Rp 2,667.21 /m2

5) 1 M3 PEMBUANGAN TANAH
Produktivitas : 169.13 m3/jam
Alat : Harga Harga Jadi
0.0008 Hari EXCAVATOR KOBELCO SK-024 6,650,000.00 5,616.91

Upah :
0.001 OH Operator 85,000.00 71.80
0.001 OH Pembantu Operator 65,000.00 54.90

Produktivitas : 62.68 m3/jam

Alat : Harga Harga Jadi


0.0023 Hari DUMP TRUCK 26 TON 1,400,000.00 3,191.01

Upah :
0.002 OH Operator 85,000.00 193.74
0.002 OH Pembantu Operator 65,000.00 148.15

HSP PEMBUANGAN TANAH = Rp 9,276.52 /m3


III. PEKERJAAN DRAINASE
1) 1 M' SALURAN BETON PRACETAK DIM 60-70

Alat : Harga Harga Jadi


0.006 Hari TRUCK CRANE 20 TON 2,250,000.00 13,392.86

Upah :
0.0004 OH Operator 50,000.00 21.26
0.0004 OH Pembantu Operator 43,000.00 18.28

Bahan :
1 m' Saluran Beton Pracetak Dim 60-70 418,000.00 418,000.00
* pengiriman dengan flat bed truck
* upah sopir
* upah pembantu sopir

Upah :
0.006 OH Mandor 85,000.00 505.95
0.012 OH Pekerja 55,000.00 654.76

HSP SALURAN = Rp 431,432.40

2) PEKERJAAN GORONG-GORONG
2.1) 1 M3 PEKERJAAN GALIAN TANAH GORONG-GORONG
Produktivitas : 166.60 m3/jam

Alat : Harga Harga Jadi


0.0009 Hari BULLDOZER D3B CATERPILLAR 10,500,000.00 9,003.53

Upah :
0.0009 OH Operator 50,000.00 42.87
0.0009 OH Pembantu Operator 43,000.00 36.87

HSP GALIAN TANAH GORONG-GORONG = Rp 9,083.28

2.2) 1 M' PEMASANGAN GORONG-GORONG PRECAST D 1,4 m

Alat : Harga Harga Jadi


0.014 Hari TRUCK CRANE 20 TON 2,250,000.00 32,142.86
Upah :
0.002 OH Operator 50,000.00 102.04
0.002 OH Pembantu Operator 43,000.00 87.76

Bahan :
1 m' Gorong-gorong precast dia 1,4 m 1,200,000.00 1,200,000.00
* pengiriman dengan flat bed truck
* upah sopir
* upah pembantu sopir

Upah :
0.014 Mandor 95,000.00 1,357.14
0.029 Pekerja 45,000.00 1,285.71

HSP SALURAN = Rp 1,234,975.51


/m'

/m3
/m'
IV. PEKERJAAN KONSTRUKSI JALAN
1) 1 M2 PEMADATAN TANAH SUB GRADE
Produktivitas : 530.24 m2/jam

Alat : Harga
0.0003 Hari TANDEM ROLLER 6-8 T. 4,000,000

Upah :
0.00027 OH Operator 85,000
0.00027 OH Pembantu Operator 65,000

HSP PEMADATAN SUBGRADE =

2) 1 M3 GELAR SIRTU DENGAN PEMADATAN TEBAL 5 CM


Produktivitas : 108.68 m3/jam

Alat : Harga
0.0013 Hari WHEEL LOADER 1.0-1.6 M3 6,650,000

Upah :
0.001 OH Operator 85,000
0.001 OH Pembantu Operator 65,000

Produktivitas : 42.50 m3/jam

Alat :
0.0034 Hari DUMP TRUCK 26 TON 800,000.00

Upah :
0.003 OH Operator 50,000
0.003 OH Pembantu Operator 43,000

Produktivitas : 1777.54 m2/jam

Alat :
0.0001 Hari MOTOR GRADER >100 HP 6,300,000

Upah :
0.0001 OH Operator 85,000
0.0001 OH Pembantu Operator 65,000

Produktivitas : 530.24 m2/jam

Alat :
0.0003 Hari TANDEM ROLLER 6-8 T. 4,000,000

Upah :
0.0003 OH Operator 85,000
0.0003 OH Pembantu Operator 65,000

Bahan :
1.2 m3 Sirtu 162,000

Upah :
0.0003 OH Mandor 85,000
0.001 OH Pekerja 55,000

HSP GELAR SIRTU DENGAN PEMADATAN TEBAL 5 CM =

3) PEKERJAAN PEMBESIAN
3.1) 1 KG DOWEL Ø 38 - 300

Pembesian 10 kg dengan besi polos


Bahan : Harga
10.5 kg Besi beton ulir/polos 10,126

Upah :
0.07 OH Pekerja 55,000
0.07 OH Tukang besi terampil 65,000
0.007 OH Kepala tukang besi 75,000
0.004 OH Mandor 85,000

HSP DOWEL =
=

3.2) 1 M' PEMASANGAN PVC 3/4"

Bahan : Harga
1 m' Pipa PVC dia 3/4" 3,037.5

Upah :
0.002 OH Pekerja 55,000
0.0001 OH Mandor 85,000
HSP PEMASANGAN PVC =

3.3) 1 KG TIE BAR D 13 - 700

Pembesian 10 kg dengan besi ulir


Alat : Harga
10.5 kg Besi beton ulir/polos 10,126

Upah :
0.07 OH Pekerja 55,000
0.07 OH Tukang besi terampil 65,000
0.007 OH Kepala tukang besi 75,000
0.004 OH Mandor 85,000

HSP DOWEL =
=

4) PEKERJAAN LEAN CONCRETE


4.1) 1 M2 BEKISTING

Bahan : Harga
0.04 m3 Kayu Kelas III 1,200,000
6 btg Dolken Ø 5 - 7 cm ukr. 350 - 400 cm 15,750
0.3 kg Baja siku 10,925
0.05 kg Paku uk 3 cm 3,031.5
0.1 liter Minyak Bekisting 6,000

Upah :
0.52 OH Pekerja 55,000
0.26 OH Tukang kayu 65,000
0.026 OH Kepala tukang kayu 75,000
0.026 OH Mandor 85,000

HSP BEKISTING =

4.2) 1 Ls PEMBONGKARAN BEKISTING


Harga
1 Ls Pembongkaran Bekisting 2,000,000

HSP PEMBONGKARAN BEKISTING =

4.3) 1 M3 PENGECORAN LEAN CONCRETE 10 cm


Harga
1.05 m 3
Ready Mix K 100 slump 12 524,200
Bahan :
247 kg Semen Holcim 50 kg
1216.6 m3 Pasir Beton
500,000
1348.65 m 3
Split
215 liter Air

Upah :
1.65 OH Pekerja
0.275 OH Tukang batu
24,200
0.028 OH Kepala tukang batu
0.083 OH Mandor

Alat :
0.002 Hari CONCRETE VIBRATOR 350,000
0.00013 Ls Alat Bantu (3 alat) 15,000

Upah :
0.0048 OH Mandor 85,000
0.010 OH Pekerja 55,000

HSP PENGECORAN LC =

5) 1 M2 PEMASANGAN PLASTIK (BOND BREAKER)

Bahan : Harga
1 m2 Plastik 3,000

Upah :
0.0004 OH Mandor 85,000
0.008 OH Pekerja 55,000

HSP PEMASANGAN PLASTIK =

6) 1 M3 PENGECORAN RIGID PAVEMENT TEBAL 36 cm

1.05 m3 Ready Mix K 225 slump 12 612,200

Bahan :
371 kg Semen Holcim 50 kg
977.2 m3 Pasir Beton
588,000
1413.45 m 3
Batu Pecah/Split ukr. 2 - 3 cm
215 liter Air

Upah :
1.65 OH Pekerja
0.275 OH Tukang batu
24,200
0.028 OH Kepala tukang batu
0.083 OH Mandor

Produktivitas : 201.69 m3/jam


Alat : Harga
0.00071 Hari SLIP FORM PAVER 3,500,000.00

Upah :
0.0007 OH Operator 85,000
0.0007 OH Pembantu Operator 65,000
0.0014 OH Pekerja 55,000
0.0007 OH Mandor 85,000

HSP PENGECORAN LC =

7) 1 TON GELAR ASPHALT CONCRETE WEARING CORSE TEBAL 5 CM DENGAN 3 KALI PEMADATAN

1.05 ton Hotmix Lapis AC-WC tebal 5 cm Lokal 871,904

Produktivitas : 221.77 ton/jam

Alat : Harga
0.0006 Hari ASPHALT FINISHER 6,300,000

Upah :
0.0006 OH Operator 85,000
0.0006 OH Pembantu Operator 65,000
0.0013 OH Pekerja 55,000
0.0006 OH Mandor 85,000

Produktivitas : 477.21 m2/jam

Alat : Harga
0.0003 Hari TANDEM ROLLER 6-8 T. 4,000,000

Upah :
0.00012 OH Operator 85,000
0.00012 OH Pembantu Operator 65,000

Produktivitas : 397.68 m2/jam

Alat : Harga
0.0004 Hari TIRE ROLLER 8-10 T. 3,850,000
Upah :
0.00014 OH Operator 85,000
0.00014 OH Pembantu Operator 65,000

HSP PENGHAMPARAN AC-WC =

8) 1 M2 PERAWATAN DENGAN KARUNG BASAH

Bahan : Harga
1 m2 Karung 2,800

Upah :
0.0083 OH Pekerja 55,000
0.000417 OH Mandor 85,000

HSP KARUNG BASAH =


Harga Jadi
1,077.69

22.90
17.51

Rp 1,118.10 /m2

Harga Jadi
8,741.37

111.73
85.44

2,689.12

168.07
144.54

506.32

6.83
5.22

1,077.69

22.90
17.51

194,400.00

22.90
29.64

Rp 208,029.28 /m3

Harga Jadi
106,323.00

3,850.00
4,550.00
525.00
297.50

Rp 115,545.50 /10 kg
Rp 11,554.55 /kg

Harga Jadi
3,037.50

110.00
8.50
Rp 3,156.00 /m'

Harga Jadi
106,323.00

3,850.00
4,550.00
525.00
297.50

Rp 115,545.50 /10 kg
Rp 11,554.55 /kg

Harga Jadi
48,000.00
94,500.00
3,277.50
151.58
600.00

28,600.00
16,900.00
1,950.00
2,210.00

Rp 196,189.08 /m2

Harga Jadi
2,000,000

Rp 2,000,000 /Ls

Harga Jadi
550,410
833.33
1.88

404.76
523.81

Rp 552,173.79 /m2

Harga Jadi
3,000

35.42
458.33

Rp 3,493.75 /m2

642,810
Harga Jadi
2,479.05

60.21
46.04
77.91
60.21

Rp 645,395.30 /m2

915,499.20

Harga Jadi
4,058.26

54.75
41.87
70.86
54.75

Harga Jadi
1,197.44

9.90
7.57

Harga Jadi
1,383.02
11.87
9.08

Rp 922,398.57 /ton

Harga Jadi
2,800

458.33
35.42

Rp 3,293.75 /m2
159,417.47
V. PEKERJAAN KONSTRUKSI JEMBATAN
1) 1 Ls PENGUKURAN PONDASI, PEAR HEAD, DLL

1 Ls Pengukuran 50,000,000

HSP PENGUKURAN =

2) PEKERJAAN PONDASI
2.1) 1 M3 GALIAN TANAH
Produktivitas : 5.67 m3/jam

Alat : Harga
0.03 Hari BORE PILE MACHINE 3,500,000

Upah :
0.03 OH Operator 85,000
0.03 OH Pembantu Operator 65,000

HSP GALIAN TANAH =

2.2) 1 M2 BEKISTING

Bahan : Harga
0.04 m3 Kayu Kelas III 1,200,000
0.30 kg Paku uk 3 cm 3,032
0.10 liter Minyak Bekisting 6,000

Upah :
0.52 OH Pekerja 55,000
0.26 OH Tukang kayu 65,000
0.026 OH Kepala tukang kayu 75,000
0.026 OH Mandor 85,000

HSP BEKISTING =

2.3) 1 M3 PENGECORAN PONDASI DENGAN READY MIX K 275

1.05 m3 Ready Mix K 275 slump 12 659,200

Bahan :
406 kg Semen Holcim 50 kg
957.60 m3 Pasir Beton
635,000
1385.10 m3 Batu Pecah/Split ukr. 2 - 3 cm
215.00 liter Air

Upah :
1.65 OH Pekerja
0.275 OH Tukang batu
24,200
0.028 OH Kepala tukang batu
0.083 OH Mandor

Produktivitas : 3.5 m3/jam

Alat :
0.041 Hari CONCRETE PUMP 3,500,000

Upah :
0.163 OH Pekerja 55,000
0.041 OH Mandor 85,000

HSP CORAN PONDASI =

3) 1 M3 PENGECORAN READY MIX K 300

1.05 m3 Ready Mix K 300 slump 12 670,200

Bahan :
413 kg Semen Holcim 50 kg 646,000
953.4 m3 Pasir Beton
1378.35 m3 Batu Pecah/Split ukr. 2 - 3 cm
215 liter Air

Upah :
1.65 OH Pekerja 24,200
0.275 OH Tukang batu
0.028 OH Kepala tukang batu
0.083 OH Mandor

Alat :
0.002 Hari CONCRETE VIBRATOR 350,000
0.0625 Ls Alat Bantu (3 alat) 15,000

Upah :
0.010 OH Pekerja 55,000
0.002 OH Mandor 85,000
HSP CORAN READY MIX K 300 =

4) 1 M2 BEKISTING PILAR

Bahan : Harga
0.04 m3 Kayu Kelas III 1,200,000
0.4 kg Paku uk 12 cm 10,320
0.2 liter Minyak Bekisting 6,000
0.02 m3 Balok kayu kamper samarinda oven uk. 6 x 12 x 400 cm 3,887,310
0.35 lbr Plywood Sungkat uk 4 x 8 x 4 mm 57,082
2 btg Dolken Ø 8 - 10 cm ukr. 350 - 400 cm 17,850

Upah :
0.66 OH Pekerja 55,000
0.33 OH Tukang kayu 65,000
0.033 OH Kepala tukang kayu 75,000
0.033 OH Mandor 85,000

HSP BEKISTING PILAR =

5) 1 M3 PENGECORAN READY MIX K 300 DENGAN CONCRETE PUMP

1.05 m3 Ready Mix K 300 slump 12 670,200

Bahan :
413 kg Semen Holcim 50 kg 646,000
953.4 m3 Pasir Beton
1378.35 m3 Batu Pecah/Split ukr. 2 - 3 cm
215 liter Air

Upah :
1.65 OH Pekerja 24,200
0.275 OH Tukang batu
0.028 OH Kepala tukang batu
0.083 OH Mandor

Alat :
0.0024 Hari CONCRETE VIBRATOR 350,000
0.0024 Hari CONCRETE PUMP 3,500,000
0.0625 Ls Alat Bantu (3 alat) 15,000

Upah :
0.0095 OH Pekerja 55,000
0.0024 OH Mandor 85,000
HSP CORAN READY MIX K 300 DENGAN CONCRETE PUMP =

6) 1 M2 BEKISTING PLAT BETON

Bahan : Harga
0.04 m3 Kayu Kelas III 1,200,000
0.40 kg Paku uk 12 cm 10,320
0.20 liter Minyak Bekisting 6,000
0.02 m3 Balok kayu kamper samarinda oven uk. 6 x 12 x 400 cm 3,887,310
0.35 lbr Plywood Sungkat uk 4 x 8 x 4 mm 57,082
6.00 btg Dolken Ø 8 - 10 cm ukr. 350 - 400 cm 17,850

Upah :
0.66 OH Pekerja 55,000
0.33 OH Tukang kayu 65,000
0.033 OH Kepala tukang kayu 75,000
0.033 OH Mandor 85,000

HSP BEKISTING PLAT =

7) 1 UNIT LAUNCHING PLAT BETON


Produktivitas : 0.83 unit/jam

Alat : Harga
0.17 Hari Crane Kobelco 7055 (Crawler) 1,100,000

Upah :
0.17 OH Operator 85,000
0.17 OH Pembantu Operator 65,000

HSP BEKISTING PLAT =

8) 1 M3 PENGECORAN READY MIX K 300 DENGAN CONCRETE PUMP

1.05 m3 Ready Mix K 275 slump 12 659,200

Bahan :
406 kg Semen Holcim 50 kg 635,000
957.60 m3 Pasir Beton
1385.10 m3 Batu Pecah/Split ukr. 2 - 3 cm
215.00 liter Air

Upah :
1.65 OH Pekerja 24,200
0.275 OH Tukang batu
0.028 OH Kepala tukang batu
0.083 OH Mandor

Alat :
0.0024 Hari CONCRETE VIBRATOR 350,000
0.0024 Hari CONCRETE PUMP 3,500,000
0.0625 Ls Alat Bantu (3 alat) 15,000

Upah :
0.0095 OH Pekerja 55,000
0.0024 OH Mandor 85,000

HSP CORAN READY MIX K 275 DENGAN CONCRETE PUMP =

9) 1 TON GELAR ASPHALT CONCRETE WEARING CORSE TEBAL 5 CM DENGAN 3 KALI PEMADATAN

1.05 ton Hotmix Lapis AC-WC tebal 5 cm Lokal 871,904

Produktivitas : 177.41 ton/jam

Alat : Harga
0.0008 Hari ASPHALT FINISHER 6,300,000

Upah :
0.0008 OH Operator 85,000
0.0008 OH Pembantu Operator 65,000

Produktivitas : 408.15 m2/jam

Alat : Harga
0.00035 Hari TANDEM ROLLER 6-8 T. 4,000,000

Upah :
0.00035 OH Operator 85,000
0.00035 OH Pembantu Operator 65,000

Produktivitas : 340.12 m2/jam

Alat : Harga
0.00042 Hari TIRE ROLLER 8-10 T. 3,850,000

Upah :
0.00042 OH Operator 85,000
0.00042 OH Pembantu Operator 65,000
HSP PENGHAMPARAN AC-WC =

10) 1 UNIT PENGADAAN PC I GIRDER POSTENSION

Bahan : Harga
1 btg PCI Girder L = 40,8 m 318,000,000

Upah :
0.2 OH Pekerja 55,000
0.01 OH Mandor 85,000

HSP PENGADAAN PC I GIRDER =

11) 1 Ls PEMASANGAN PC I GIRDER POSTENSION


Produktivitas : 0.905 batang/jam

Alat : Harga
0.16 Hari Crane Kobelco 7055 (Crawler) 1,100,000

Upah :
0.16 OH Operator 85,000
0.16 OH Pembantu Operator 65,000

HSP PEMASANGAN PC I GIRDER =

12) 1 UNIT PENGADAAN DIAFRAGMA PRACETAK K 350

Bahan : Harga
1 buah Diafragma Pracetak K350 H 0,90 2,200,000

Upah :
0.2 OH Pekerja 55,000
0.01 OH Mandor 85,000

HSP PENGADAAN PC I GIRDER =

13) 1 Ls PEMASANGAN DIAFRAGMA PRACETAK


Produktivitas : 0.83 buah/jam

Alat : Harga
0.17 Hari Crane Kobelco 7055 (Crawler) 1,100,000

Upah :
0.17 OH Operator 85,000
0.17 OH Pembantu Operator 65,000

HSP PEMASANGAN PC I GIRDER =

14) 1 KG PENULANGAN DENGAN BESI POLOS ATAU ULIR

Pembesian 10 kg dengan besi polos/ulir


Bahan : Harga
10.5 kg Besi beton ulir/polos 10,126
0.2 kg Kawat beton 10,126

Upah :
0.07 OH Pekerja 55,000
0.07 OH Tukang besi terampil 65,000
0.007 OH Kepala tukang besi 75,000
0.004 OH Mandor 85,000

HSP DOWEL =
=

15) 1 BUAH PENGADAAN DAN PEMASANGAN ELASTOMER

Bahan : Harga
1 buah Elastomer (300 x 350 x 36) 567,000

Upah :
0.2 OH Pekerja 55,000
0.01 OH Mandor 85,000

Produktivitas : 1 buah/jam

Alat :
0.14 Hari Crane Kobelco 7055 (Crawler) 1,100,000

Upah :
0.14 OH Operator 85,000
0.14 OH Pembantu Operator 65,000

HSP ELASTOMER =

16) 1 M2 BEKISTING ABUTMENT

Bahan : Harga
0.17 m3 Kaso kayu kamper samarinda oven uk. 4 x 6 x 400 cm 3,033,450
0.4 kg Paku uk 7 cm 6,450
0.347 lbr Multiplek ukr. 122 x 244 x 9 mm 97,800

Upah :
0.52 OH Pekerja 55,000
0.26 OH Tukang kayu 65,000
0.026 OH Kepala tukang kayu 75,000
0.026 OH Mandor 85,000

HSP BEKISTING ABUTMENT =


50,000,000

Rp 50,000,000 /Ls

Harga Jadi
88,183.42

2,141.60
1,637.69

Rp 91,962.71 /m3

Harga Jadi
48,000
909
600

28,600
16,900
1,950
2,210

Rp 99,169.45 /m2

692,160
142,857.14

8,979.59
3,469.39

Rp 847,466.12 /m3

703,710

833.33
937.50

523.81
202.38
706,207.02 /m3

Harga Jadi
48,000
4,128
1,200
58,310
19,979
35,700

36,300
21,450
2,475
2,805

Rp 230,346.18 /m2

703,710

833.33
8,333.33
937.50

523.81
202.38
714,540.36 /m3

Harga Jadi
48,000
4,128
1,200
58,310
19,979
107,100

36,300
21,450
2,475
2,805

Rp 301,746.18 /m2

Harga Jadi
189,329

14,630
11,188

Rp 215,146.30 /unit

692,160
833
8,333
938

523.8095238095
202.380952381

Rp 702,990.36 /m3

915,499

Harga Jadi
5,072.99

68.45
52.34

Harga Jadi
1,400.05

29.75
22.75

Harga Jadi
1,617.08

35.70
27.30
Rp 923,825.61 /ton

Harga Jadi
318,000,000

11000
850

Rp 318,011,850.00 /unit

Harga Jadi
173,639

13,418
10,260

Rp 197,316.50 /unit
Rp 5,919,494.87 /Ls

Harga Jadi
2,200,000

11000
850

Rp 2,211,850.00 /unit

Harga Jadi
189,329
14,630
11,188

Rp 215,146.30 /unit
Rp 35,283,993.12 /Ls

Harga Jadi
106,323.00
1,518.90

3,850.00
4,550.00
525.00
297.50

Rp 117,064.40 /10 kg
Rp 11,706.44 /kg

Harga Jadi
567,000

11,000
850

157,143

12,142.86
9,285.71

Rp 757,421.43 /buah

Harga jadi
515,686.50
2,580.00
33,936.60

28,600.00
16,900.00
1,950.00
2,210.00

Rp 601,863.10 /m2
VI. PEKERJAAN MEDIAN
1) 1 UNIT PEMASANGAN MCB (PRECAST)

Bahan : Harga Harga Jadi


1 unit Median Concrete Barrier (Precast) 880,000 880,000

Upah :
0.00476 OH Pekerja 55,000 261.90
0.00024 OH Mandor 85,000 20.24

Alat :
0.00238 Hari BARRIER LIFT 6,650,000 15,833.33

Upah :
0.002 OH Operator 85,000 202.38
0.002 OH Pembantu Operator 65,000 154.76

HSP PEMASANGAN MCB = Rp 896,472.62 /unit

2) 1 M3 PENANAMAN RUMPUT

Bahan : Harga Harga Jadi


1 m2 Rumput embun (Polytrias sp) lempeng 6,100 6,100

Upah :
0.007 OH Pekerja 55,000 392.86
0.00036 OH Mandor 85,000 30.36

HSP PENANAMAN RUMPUT = Rp 6,523.21 /m2

3) 1 POT POHON PEREDU

Bahan : Harga Harga Jadi


1 pot Kol Banda (Pisona Alba) 25,000 25,000

Upah :
0.01 OH Pekerja 55,000 654.76
0.0006 OH Mandor 85,000 50.60
HSP POHON PEREDU = Rp 25,705 /pot
VII. PEKERJAAN LAIN-LAIN
1) 1 M2 PEMBUATAN MARKA JALAN

Bahan :
1.95 kg Cat Marka / Thermoplastik
1.05 liter Thinner
0.45 kg Glass Bead

Alat :
0.002 Hari ROAD MARKING MACHINE

Upah :
0.002 OH Operator
0.002 OH Pembantu Operator

HSP PEMBUATAN MARKA =

2) 1 UNIT REFLEKTOR SETIAP 15 M

Bahan :
1 unit Reflektor Merah/Kuning

Upah :
0.024 OH Pekerja
0.002 OH Mandor

HSP PEMASANGAN REFLEKTOR =

3. RAMBU
3.1) 1 UNIT RAMBU STA

Bahan :
1 unit Panel + Tiang Rambu STA
0.00225 m3 Ready Mix K 100 slump 12

Upah :
0.071 OH Pekerja
0.007 OH Mandor

HSP RAMBU STA =


3.2) 1 UNIT RAMBU LARANGAN

Bahan :
1 unit Panel + Tiang Rambu Larangan
0.00225 m3 Ready Mix K 100 slump 12

Upah :
0.071 OH Pekerja
0.007 OH Mandor

HSP RAMBU LARANGAN =

3.3) 1 UNIT RAMBU PERINGATAN

Bahan :
1 unit Panel + Tiang Rambu Peringatan
0.00225 m3 Ready Mix K 100 slump 12

Upah :
0.071 OH Pekerja
0.007 OH Mandor

HSP RAMBU PERINGATAN =

3.4) 1 UNIT RAMBU PETUNJUK

Bahan :
1 unit Panel Rambu Petunjuk 150 x 200 cm Tiang 7 m
0.0045 m3 Ready Mix K 100 slump 12

Upah :
0.071 OH Pekerja
0.007 OH Mandor

HSP RAMBU PETUNJUK =

4) PENERANGAN JALAN UMUM


4.1) 1 UNIT PJU

Bahan :
1 set PJU Tenaga Surya 30W LED Tiang Model Kupu-kupu
* 2 Unit Modul Surya 100 Wp
* 1 Unit Electronic Box System
* 2 Set Lampu Jalan 30 Watt - 12 Volt (LED)
* 1 Set Kabel Instalasi Modul NYYHY 2 x 2,5mm + Kabel Battery NYAF 2,5mm
+ Kabel Lampu NYYHY 2 x 1,5mm
* 1 Set Tiang 7 Meter, Penyangga Panel, Tiang Armatur Lampu (Galvanis)
* 1 Set Aksesories (mur, baut, klem accu)

Upah :
0.143 OH Pekerja
0.014 OH Mandor

HSP RAMBU STA =

4.2) 1 M3 PONDASI PJU

1.05 m3 Ready Mix K 100 slump 12

HSP PONDASI PJU =

5) 1 M' PEMASANGAN GUARDRAIL

Bahan :
1 m' Guardrail Beam : Panjang 4320 mm x Lebar 312 mm x Tebal 2.7 mm
* beam 4320 x 312 x 2,7 mm
* tiang penyangga 1800 x 178 x 76 x 4,5 / 6,0 mm
* besi pengikat 350 x 178 x 76 x 4,5 / 6,0 mm
* terminal-end 725 x 2,7 mm

Upah :
0.024 OH Pekerja
0.0012 OH Mandor

HSP PEMASANGAN GUARDRAIL =

6) 1 Ls PEMBERSIHAN KEMBALI

1 ls Pembersihan kembali

HSP PEMBERSIHAN KEMBALI =


Harga Harga Jadi
27,500 53,625
12,000 12,600
28,600 12,870

1,750,000 4,166.67

85,000 202.38
65,000 154.76

SP PEMBUATAN MARKA = Rp 83,618.81 /m2

Harga Harga Jadi


35,000 35,000

55,000 1,309.52
85,000 202.38

MASANGAN REFLEKTOR = Rp 36,511.90 /unit

Harga Harga Jadi


580,000 580,000
524,200 1,179

55,000 3,928.57
85,000 607.14

HSP RAMBU STA = Rp 585,715.16 /unit


Harga Harga Jadi
850,000 850,000
524,200 1,179

55,000 3,928.57
85,000 607.14

HSP RAMBU LARANGAN = Rp 855,715.16 /unit

Harga Harga Jadi


850,000 850,000
524,200 1,179

55,000 3,928.57
85,000 607.14

P RAMBU PERINGATAN = Rp 855,715.16 /unit

Harga Harga Jadi


8,000,000 8,000,000
524,200 2,359

55,000 3,928.57
85,000 607.14

HSP RAMBU PETUNJUK = Rp 8,006,894.61 /unit

Harga Harga Jadi


16,325,000 16,325,000
55,000 7,857.14
85,000 1,214.29

HSP RAMBU STA = Rp 16,334,071.43 /unit

524,200.00 Rp 550,200.00

HSP PONDASI PJU = Rp 550,200.00 /m3

Harga Harga Jadi


385,000 385,000

55,000 1309.52
85,000 101.19

MASANGAN GUARDRAIL = 386,411 /m'

15,000,000 15,000,000

EMBERSIHAN KEMBALI = 15,000,000 /Ls


BARCHART PELAKSANAAN PEKERJAAN DAN KURVA S
PROYEK JALAN TOL JORR
RUAS JAGAKARSA - PASAR MINGGU Sta. (0+000) – Sta. (5+496.435)
PT. RPA CONSTRUCTION
JANUARI FEBRUARI MARET
HARGA SATUAN DURASI
NO URAIAN PEKERJAAN KUANTITAS SATUAN HARGA BOBOT Minggu ke 1 Minggu ke 2 Minggu ke 3 Minggu ke 4 Minggu ke 5 Minggu ke 6 Minggu ke 7 Minggu ke 8 Minggu ke 9 Minggu ke 10 Minggu ke 11 Minggu ke 12
PEKERJAAN (HARI)
8 s/d 14 15 s/d 21 22 s/d 28 29 s/d 4 5 s/d 11 12 s/d 18 19 s/d 25 26 s/d 3 4 s/d 10 11 s/d 17 18 s/d 24 25 s/d 31
I PEKERJAAN PERSIAPAN
1.1 Pembersihan Lokasi 175,904 m2 Rp 11,162.81 Rp 1,978,582,119.56 0.01990 19 0.008 0.008 ###

1.2 Pengukuran dan Pemasangan Patok 10,994 m' Rp 7,562.96 Rp 83,147,221.43 0.00084 16 0.001 0.001 0.0003

1.3 Pemagaran Base Camp 220 m' Rp 109,619.89 Rp 24,116,376.43 0.00024 2 ###

1.4 Papan Nama Proyek 2 unit Rp 731,009.47 Rp 1,462,018.94 0.00001 4 0.0003 ###

1.5 Direksi Keet 72 m2 Rp 1,339,373.49 Rp 96,434,891.48 0.00097 5 0.001 ###

1.6 Pos Keamanan 4 m2 Rp 239,110.50 Rp 956,442.00 0.00001 1 ###

1.7 Gudang penyimpanan material 20 m2 Rp 287,585.00 Rp 5,751,700.00 0.00006 2 ###

1.8 Bedeng 18 m2 Rp 300,306.00 Rp 5,405,508.00 0.00005 3 0.0003

1.9 Bengkel Kerja 30 m2 Rp 811,562.75 Rp 24,346,882.50 0.00024 4 ### ###

1.10 Pengujian Bahan 1 Ls Rp 444,979,880.00 Rp 444,979,880.00 0.00447 12 ### ### 0.001

1.11 Dokumentasi Proyek 1 Ls Rp 1,640,000.00 Rp 1,640,000.00 0.00002 2 ### 0.000

1.12 Pengadaan Air Bersih 2 unit Rp 4,369,700.00 Rp 8,739,400.00 0.00009 4 ### 0.000

1.13 Pengadaan Listrik Kerja 1 unit Rp 80,209,760.00 Rp 80,209,760.00 0.00081 4 ### 0.001

1.14 Pengadaan Telepon 5 unit Rp 692,000.00 Rp 3,460,000.00 0.00003 4 ### 0.000

1.15 Penyediaan Penerangan 1 unit Rp 40,205,000.00 Rp 40,205,000.00 0.00040 4 ### 0.000

1.16 Penyediaan P3K 1 unit Rp 350,000.00 Rp 350,000.00 0.00000 1 ###

1.17 Mushola 2 m2 Rp 224,591.36 Rp 449,182.72 0.00000 2 ######

1.18 Mobilisasi & Demolibisasi 1 Ls Rp 106,000,000.00 Rp 106,000,000.00 0.00107 20 ### ### ### ### ### ###

Total = Rp 2,906,236,383.05
II PEKERJAAN TANAH
2.1 Striping
2.1.1 Striping top soil (15 cm) 16,348 m3 Rp 5,479.29 Rp 89,578,044.74 0.00090 5 ### 0.0006

2.1.2 Pembuangan tanah striping 16,348 m3 Rp 9,057.27 Rp 148,072,490.29 0.00149 8 ### 0.0014

2.2 Galian tanah 145,796 m3 Rp 6,849.11 Rp 998,572,813.84 0.01004 19 0.0042 0.0028 0.0016

2.3 Tanah timbunan 108,990 m3 Rp 7,306.62 Rp 796,347,621.05 0.00801 29 0.0008 0.0014 0.0014 0.0014 0.0012

2.4 Perataan 175,909 m2 Rp 2,667.21 Rp 469,185,269.31 0.00472 6 ### 0.0039

2.5 Pembuangan tanah 36,905 m3 Rp 9,276.52 Rp 342,346,303.16 0.00344 9 ### 0.0026

Total = Rp 2,844,102,542.39
IV PEKERJAAN KONSTRUKSI JALAN
3.1 Pemadatan Tanah Sub Grade 159,417 m2 Rp 1,118.10 Rp 178,244,782.28 0.00179 11 0.0012 0.001

3.2 Lapisan Sirtu 5 cm 7,971 m3 Rp 208,029.28 Rp 1,658,175,126.74 0.01668 12 0.008 0.008

3.3 Pekerjaan Lean Concrete


3.3.1 Bekisting 2,205 m2 Rp 196,189.08 Rp 432,530,544.27 0.00435 3 0.003 ###

3.3.2 Pengecoran LC 10 cm 15,942 m³ Rp 552,173.79 Rp 8,802,615,080.32 0.08852 19 ### 0.0329 0.0329 0.019 curing time
3.3.3 Pembongkaran Bekisting 1 Ls Rp 2,000,000.00 Rp 2,000,000.00 0.00002 2
3.4 Pemasangan plastik (bond breaker) 159,417 m2 Rp 3,493.75 Rp 556,964,803.19 0.00560 3 ###

3.5 Rigid Pavement 36 cm 57,390 m³ Rp 645,395.30 Rp 37,039,423,904.02 0.37248 21


a Dowel Ø 38 - 300 146,536 kg Rp 11,554.55 Rp 1,693,153,785.16 0.01703 21
b Pemasangan PVC 3/4" (untuk dowel) 2,743 m' Rp 3,156.00 Rp 8,657,697.00 0.00009 21
c Tie Bar D 13 - 700 22,907 kg Rp 11,554.55 Rp 264,685,225.35 0.00266 21
3.6 Curing (Karung Basah) 159,417 m2 Rp 3,293.75 Rp 525,081,308.19 0.00528 28
3.7 Pekerjaan AC-WC 5 cm 18,652 ton Rp 922,398.57 Rp 17,766,758,542.33 0.17867 11
Total = Rp 68,928,290,798.86
III PEKERJAAN DRAINASE
3.1 Pekerjaan Saluran
3.1 Saluran Beton Pracetak Dim 60-70 10,994 m' Rp 431,432.40 Rp 4,743,300,931.31 0.04770 33
3.2 Pekerjaan Gorong - gorong
3.2.1 Pekerjaan Galian tanah gorong-gorong 99 m3 Rp 9,083.28 Rp 894,887.47 0.00001 1 ###

3.2.2 Pemasangan gorong-gorong precast diameter = 1,40 m 64 m' Rp 1,234,975.51 Rp 79,038,432.65 0.00079 1 ###

Total = Rp 4,823,234,251.43
V PEKERJAAN KONSTRUKSI JEMBATAN
5.1 Pekerjaan Pengukuran
5.1.1 Pengukuran Pondasi, Pear Head, dsb 1 Ls Rp 50,000,000.00 Rp 50,000,000.00 0.00050 5
5.2 Pekerjaan Pondasi
5.2.1 Galian Tanah 384.76 m³ Rp 91,962.71 Rp 35,383,309.26 0.00036 12
5.2.2 Bekisting 142.50 m2 Rp 99,169.45 Rp 14,131,908.71 0.00014 10
5.2.3 Penulangan diameter 10 & 16 2,538.92 kg Rp 11,706.44 Rp 29,721,723.85 0.00030 6
5.2.4 Pengecoran K 275 64.13 m³ Rp 847,466.12 Rp 54,344,772.95 0.00055 10
5.3 Pekerjaan Pilecap
5.3.1 Bekisting 38.4 m² Rp 99,169.45 Rp 3,808,106.88 0.00004 2
5.3.2 Penulangan diameter 10, 13 & 19 1,028.53 kg Rp 11,706.44 Rp 12,040,452.61 0.00012 2
5.3.3 Pengecoran K 300 32 m³ Rp 706,207.02 Rp 22,598,624.76 0.00023 2
5.4 Pekerjaan Pilar
5.4.1 Bekisting 69.37 m² Rp 230,346.18 Rp 15,978,277.03 0.00016 2
5.4.2 Penulangan diameter 10 341.67 kg Rp 11,706.44 Rp 3,999,749.89 0.00004 2
5.4.3 Pengecoran K 300 13.87 m³ Rp 714,540.36 Rp 9,913,013.56 0.00010 1
5.5 Pekerjaan Pier Head
5.5.1 Bekisting 62.4 m² Rp 230,346.18 Rp 14,373,601.32 0.00014 2
5.5.2 Penulangan diameter 10, 13 & 19 1,528.81 kg Rp 11,706.44 Rp 17,896,904.44 0.00018 2
5.5.3 Pengecoran K 300 72 m³ Rp 714,540.36 Rp 51,446,905.71 0.00052 4
5.6 Pekerjaan Abutment
5.6.1 Bekisting 483.853 m² Rp 601,863.10 Rp 291,213,266.52 0.00293 6
5.6.2 Penulangan diameter 13, 16 & 19 1,407.39 Rp 11,706.44 Rp 16,475,479.66 0.00017 5
5.6.3 Pengecoran K 300 77.265 m³ Rp 714,540.36 Rp 55,208,960.69 0.00056 4
5.7 Elastomer 18 buah Rp 757,421.43 Rp 13,633,585.71 0.00014 2
5.8 Pekerjaan Pelat Injak
5.8.1 Bekisting 0.924 m² Rp 230,346.18 Rp 212,839.87 0.00000 3
5.8.2 Penulangan diameter 10, 16 & 19 18,939.32 kg Rp 11,706.44 Rp 221,712,054.65 0.00223 11
5.8.3 Pengecoran K 300 61.824 m³ Rp 714,540.36 Rp 44,175,743.04 0.00044 4
5.9 Pekerjaan Pelat Beton
5.9.1 Bekisting 3.136 m² Rp 301,746.18 Rp 946,276.00 0.00001 1
5.9.2 Pengecoran K 300 10.752 m³ Rp 706,207.02 Rp 7,593,137.92 0.00008 2
5.9.3 Launching Plat Beton 24 unit Rp 215,146.30 Rp 5,163,511.19 0.00005 5
5.10 Pekerjaan Beton Precast
5.10.1 Pekerjaan Girder
a Pengadaan Girder K-350 15 unit Rp 318,011,850.00 Rp 4,770,177,750.00 0.04797 19
b Pemasangan Girder 1 Ls Rp 5,919,494.87 Rp 5,919,494.87 0.00006 19
5.10.2 Pekerjaan Diafragma
a Pengadaan Diafragma K-350 164 unit Rp 2,211,850.00 Rp 362,743,400.00 0.00365 20
b Pemasangan Diafragma 1 Ls Rp 35,283,993.12 Rp 35,283,993.12 0.00035 20
5.11 Pekerjaan Rigid Pavement
5.11.1 Rigid tebal 25 cm
a Bekisting 3.5 m² Rp 196,189.08 Rp 686,661.76 0.00001 2
b Penulangan diameter 10, 16 & 19 20,522.71 kg Rp 11,706.44 Rp 240,247,877.51 0.00242 12
c Pengecoran K 275 300 m³ Rp 702,990.36 Rp 210,897,107.14 0.00212 6
5.1.2 AC-WC 5 cm 60 m³ Rp 923,825.61 Rp 60,743,787.28 0.00061 1
5.11 Pekerjaan Parapet
5.12.1 Bekisting 384.575 m² Rp 196,189.08 Rp 75,449,413.52 0.00076 6
5.12.2 Penulangan diameter 10 & 13 4,761.11 kg Rp 11,706.44 Rp 55,735,643.46 0.00056 10
5.12.3 Pengecoran K 300 82.5 m³ Rp 714,540.36 Rp 58,949,579.46 0.00059 5
5.13 Pelepasan Bekisting 1 Ls Rp 50,000,000.00 Rp 50,000,000.00 0.00050 6
Total = Rp 6,918,806,914.34
VI PEKERJAAN MEDIAN
6.1 Pemasangan MCB ( pre cast ) 10,994 unit Rp 896,472.62 Rp 9,855,819,973.81 0.09911 14
6.2 Penanaman Rumput 10,994 m2 Rp 6,523.21 Rp 71,716,217.86 0.00072 8
6.3 Pohon Peredu 1,099 buah Rp 25,705.36 Rp 28,261,262.96 0.00028 7
Total = Rp 9,955,797,454.63
VII PEKERJAAN LAIN-LAIN
7.1 Pembuatan Marka Jalan
7.1.1 Marka Badan Jalan 942.34 m2 Rp 83,618.81 Rp 78,797,587.88 0.00079 1
7.1.2 Marka Bahu Dalam 2,198.8 m2 Rp 83,618.81 Rp 183,861,038.38 0.00185 2

7.1.3 Marka Bahu Luar 2,198.8 m2 Rp 83,618.81 Rp 183,861,038.38 0.00185 2


7.2 Reflektor setiap 15 m 1,466 unit Rp 36,511.90 Rp 53,521,584.13 0.00054 9
7.3 Rambu
7.3.1 Rambu STA (setiap 200 m) 27 unit Rp 585,715.16 Rp 16,098,381.29 0.00016 1
7.3.2 Rambu Larangan 12 unit Rp 855,715.16 Rp 10,268,581.97 0.00010 1
7.3.3 Rambu Peringatan 32 unit Rp 855,715.16 Rp 27,382,885.26 0.00028 1
7.3.4 Rambu Petunjuk 26 unit Rp 8,006,894.61 Rp 208,179,259.97 0.00209 1
7.4 Penerangan Jalan Umum
7.4.1 Lampu PJU (setiap 100 m) 112 set Rp 16,334,071.43 Rp 1,828,435,955.71 0.01839 4
7.4.2 Pondasi PJU 1.51 m3 Rp 550,200.00 Rp 831,456.74 0.00001 4
7.5 Penanaman Rumput di Tepian Bahu Luar 43,977.23 m2 Rp 6,523.21 Rp 286,872,924.17 0.00288 22
7.6 Pemasangan Guardrail 481.54 m' Rp 386,410.71 Rp 186,071,442.54 0.00187 2
Total = Rp 3,064,182,136.42
Sub Total Rencana Anggaran Biaya = Rp 99,440,650,481
PPN 10% = Rp 9,944,065,048 1.00 Jumlah 0.013 0.011 0.008 0.004 0.005 0.005 0.006 0.0094 0.017 0.034 0.033 0.023
Grand Total Rencana Anggaran Biaya = Rp 109,384,716,000 Kumulatif 1.3% 2.4% 3.2% 3.6% 4.1% 4.6% 5.2% 6.2% 7.9% 11.4% 14.6% 16.9%
BARCHART PELAKSANAAN PEKERJAAN DAN KURVA S
PROYEK JALAN TOL JORR
RUAS JAGAKARSA - PASAR MINGGU Sta. (0+000) – Sta. (5+496.435)
PT. RPA CONSTRUCTION
APRIL MEI JUNI JULI AGUSTUS
Minggu ke 13 Minggu ke 14 Minggu ke 15 Minggu ke 16 Minggu ke 17 Minggu ke 18 Minggu ke 19 Minggu ke 20 Minggu ke 21 Minggu ke 22 Minggu ke 23 Minggu ke 24 Minggu ke 25 Minggu ke 26 Minggu ke 27 Minggu ke 28 Minggu ke 29 Minggu ke 30 Minggu ke 31 Minggu ke 32 Minggu ke 33 Minggu ke 34
1 s/d 7 8 s/d 14 15 s/d 21 22 s/d 28 29 s/d 5 6 s/d 12 13 s/d 19 20 s/d 26 27 s/d 2 3 s/d 9 10 s/d 16 17 s/d 23 24 s/d 30 1 s/d 7 8 s/d 14 15 s/d 21 22 s/d 28 29 s/d 4 5 s/d 11 12 s/d 18 19 s/d 25 26 s/d 31

0.004

0.001 ### 0.001

### ### ### ### ### 0.0004

curing time
###

###

### 0.1233 0.1233 0.089

### 0.0044 0.0044 0.005

### 0.0007 0.0007 0.001


### 0.0014 0.0014 0.001

0.0014 0.0014 0.0014 0.0014

### 0.1080 ###

### 0.0087 0.0087 0.0087 0.0087 0.006

0.001

0.0005 0.0007

### 0.0007 ###

0.0004 ###

0.0003 0.0007 curing time

###

######

### curing time

###
###

### curing time

###

###

### 0.0006 curing time

0.0025
0.0005
0.0006 ### curing time

###

0.0003
0.0015 0.0018

0.0006 ### curing time

###
### curing time

### 0.0003

### 0.0182 0.0182 0.0104


### 0.0007 0.0007 0.0004

0.0010 0.0014 0.0016


0.0008 0.0007 0.0005

######
0.0015 0.0009

0.0024 curing time

###

0.0008 ###

0.0003 0.0007

0.0008 ### curing time


0.0006

### 0.0494 0.0341

### 0.0006

### 0.0006

###

###

###

0.0003 0.0006

###
###

###

###

0.0184

0.0004

### 0.0014 0.0014 0.0012

###

0.039 0.131 0.131 0.096 0.034 0.111 0.038 0.011 0.010 0.013 0.008 0.005 0.021 0.021 0.013 0.002 0.005 0.020 0.052 0.039 0.023 0.007
20.8% 34.0% 47.1% 56.7% 60.1% 71.2% 75% 76.1% 77.1% 78.4% 79.2% 79.7% 81.9% 84% 85.2% 85.4% 85.9% 88% 93.1% 97% 99.3% 100%
RENCANA ANGGARAN BIAYA
PROYEK JALAN TOL JORR
RUAS JAGAKARSA - PASAR MINGGU Sta. (0+000) – Sta. (5+496.435)
PT. RPA CONSTRUCTION

NO URAIAN PEKERJAAN KUANTITAS SATUAN HARGA SATUAN PEKERJAAN


I PEKERJAAN PERSIAPAN
1.1 Pembersihan Lokasi 175,904 m2 Rp 11,162.81
1.2 Pengukuran dan Pemasangan Patok 10,994 m' Rp 7,562.96
1.3 Pemagaran Base Camp 220 m' Rp 109,619.89
1.4 Papan Nama Proyek 2 unit Rp 731,009.47
1.5 Direksi Keet 72 m2 Rp 1,339,373.49
1.6 Pos Keamanan 4 m2 Rp 239,110.50
1.7 Gudang penyimpanan material 20 m2 Rp 287,585.00
1.8 Bedeng 18 m2 Rp 300,306.00
1.9 Bengkel Kerja 30 m2 Rp 811,562.75
1.10 Pengujian Bahan 1 Ls Rp 444,979,880.00
1.11 Dokumentasi Proyek 1 Ls Rp 1,640,000.00
1.12 Pengadaan Air Bersih 2 unit Rp 4,369,700.00
1.13 Pengadaan Listrik Kerja 1 unit Rp 80,209,760.00
1.14 Pengadaan Telepon 5 unit Rp 692,000.00
1.15 Penyediaan Penerangan 1 unit Rp 40,205,000.00
1.16 Penyediaan P3K 1 unit Rp 350,000.00
1.17 Mushola 2 m2 Rp 224,591.36
1.18 Mobilisasi & Demolibisasi 1 Ls Rp 106,000,000.00
Total =
II PEKERJAAN TANAH
2.1 Striping
2.1.1 Striping top soil (15 cm) 16,348 m3 Rp 5,479.29
2.1.2 Pembuangan tanah striping 16,348 m3 Rp 9,057.27
2.2 Galian
2.2.1 Galian tanah 145,796 m3 Rp 6,849.11
2.3 Timbunan
2.3.1 Tanah timbunan 108,990 m3 Rp 7,306.62
2.4 Perataan 175,909 m2 Rp 2,667.21
2.5 Pembuangan tanah 36,905 m3 Rp 9,276.52
Total =
III PEKERJAAN DRAINASE
3.1 Pekerjaan Saluran
3.1 Saluran Beton Pracetak Dim 60-70 10,994 m' Rp 431,432.40
3.2 Pekerjaan Gorong - gorong
3.2.1 Pekerjaan Galian tanah gorong-gorong 99 m3 Rp 9,083.28
3.2.2 Pemasangan gorong-gorong precast diameter = 1,40 m ; panjang = 32 m 64 m' Rp 1,234,975.51
Total =
IV PEKERJAAN KONSTRUKSI JALAN
4.1 Pekerjaan Sub Grade
4.1.1 Pemadatan tanah Sub Grade 159,417 m2 Rp 1,118.10
4.2 Lapisan Sirtu
4.2.1 Pemadatan Sirtu 5 cm 7,971 m3 Rp 208,029.28
4.3 Pekerjaan Penulangan
4.3.1 Penulangan Dowel Ø 38 - 300 146,536 kg Rp 11,554.55
4.3.2 Pemasangan PVC 3/4" 2,743 m' Rp 3,156.00
4.3.3 Penulangan Tie Bar D 13 - 700 22,907 kg Rp 11,554.55
4.4 Pekerjaan Lean Concrete
4.4.1 Pekerjaan Bekisting 2,205 m2 Rp 196,189.08
4.4.2 Pembongkaran Bekisting 1 Ls Rp 2,000,000.00
4.4.3 Pengecoran LC 10 cm 15,942 m³ Rp 552,173.79
4.5 Pemasangan plastik (bond breaker) 159,417 m2 Rp 3,493.75
4.6 Rigid Pavement
4.6.3 Pengecoran Rigid Pavement 36 cm 57,390 m³ Rp 645,395.30
4.7 Pekerjaan AC-WC 5 cm 18,652 ton Rp 922,398.57
4.8 Perawatan dengan Pembasahan (Karung Basah) 159,417 m2 Rp 3,293.75
Total =
V PEKERJAAN KONSTRUKSI JEMBATAN
5.1 Pekerjaan Pengukuran
5.1.1 Pengukuran Pondasi, Pear Head, dsb 1 Ls Rp 50,000,000.00
5.2 Pekerjaan Pondasi
5.2.1 Galian Tanah 384.76 m³ Rp 91,962.71
5.2.2 Bekisting 142.50 m2 Rp 99,169.45
5.2.3 Penulangan diameter 10 & 16 2,538.92 kg Rp 11,706.44
5.2.4 Pengecoran K 275 64.13 m³ Rp 847,466.12
5.3 Pekerjaan Pilecap
5.3.1 Bekisting 38.4 m² Rp 99,169.45
5.3.2 Penulangan diameter 10, 13 & 19 1,028.53 kg Rp 11,706.44
5.3.3 Pengecoran K 300 32 m³ Rp 706,207.02
5.4 Pekerjaan Pilar
5.4.1 Bekisting 69.37 m² Rp 230,346.18
5.4.2 Penulangan diameter 10 341.67 kg Rp 11,706.44
5.4.3 Pengecoran K 300 13.87 m³ Rp 714,540.36
5.5 Pekerjaan Pier Head
5.5.1 Bekisting 62.4 m² Rp 230,346.18
5.5.2 Penulangan diameter 10, 13 & 19 1,528.81 kg Rp 11,706.44
5.5.3 Pengecoran K 300 72 m³ Rp 714,540.36
5.6 Pekerjaan Abutment
5.6.1 Bekisting 483.853 m² Rp 601,863.10
5.6.2 Penulangan diameter 13, 16 & 19 1,407.39 Rp 11,706.44
5.6.3 Pengecoran K 300 77.265 m³ Rp 714,540.36
5.7 Elastomer 18 buah Rp 757,421.43
5.8 Pekerjaan Pelat Injak
5.8.1 Bekisting 0.924 m² Rp 230,346.18
5.8.2 Penulangan diameter 10, 16 & 19 18,939.32 kg Rp 11,706.44
5.8.3 Pengecoran K 300 61.824 m³ Rp 714,540.36
5.9 Pekerjaan Pelat Beton
5.9.1 Bekisting 3.136 m² Rp 301,746.18
5.9.2 Pengecoran K 300 10.752 m³ Rp 706,207.02
5.9.3 Launching Plat Beton 24 unit Rp 215,146.30
5.10 Pekerjaan Beton Precast
5.10.1 Pekerjaan Girder
a Pengadaan Girder K-350 15 unit Rp 318,011,850.00
b Pemasangan Girder 1 Ls Rp 5,919,494.87
5.10.2 Pekerjaan Diafragma
a Pengadaan Diafragma K-350 164 unit Rp 2,211,850.00
b Pemasangan Diafragma 1 Ls Rp 35,283,993.12
5.11 Pekerjaan Rigid Pavement
5.11.1 Rigid tebal 25 cm
a Bekisting 3.5 m² Rp 196,189.08
b Penulangan diameter 10, 16 & 19 20,522.71 kg Rp 11,706.44
c Pengecoran K 275 300 m³ Rp 702,990.36
5.1.2 AC-WC 5 cm 60 m³ Rp 923,825.61
5.11 Pekerjaan Parapet
5.12.1 Bekisting 384.575 m² Rp 196,189.08
5.12.2 Penulangan diameter 10 & 13 4,761.11 kg Rp 11,706.44
5.12.3 Pengecoran K 300 82.5 m³ Rp 714,540.36
5.13 Pelepasan Bekisting 1 Ls Rp 50,000,000.00
Total =
VI PEKERJAAN MEDIAN
6.1 Pemasangan MCB ( pre cast ) 10,994 unit Rp 896,472.62
6.2 Penanaman Rumput 10,994 m2 Rp 6,523.21
6.3 Pohon Peredu 1,099 buah Rp 25,705.36
Total =
VII PEKERJAAN LAIN-LAIN
7.1 Pembuatan Marka Jalan
7.1.1 Marka Badan Jalan 942.34 m2 Rp 83,618.81
7.1.2 Marka Bahu Dalam 2,198.8 m2 Rp 83,618.81
7.1.3 Marka Bahu Luar 2,198.8 m2 Rp 83,618.81
7.2 Reflektor setiap 15 m 1,466 unit Rp 36,511.90
7.3 Rambu
7.3.1 Rambu STA (setiap 200 m) 27 unit Rp 585,715.16
7.3.2 Rambu Larangan 12 unit Rp 855,715.16
7.3.3 Rambu Peringatan 32 unit Rp 855,715.16
7.3.4 Rambu Petunjuk 26 unit Rp 8,006,894.61
7.4 Penerangan Jalan Umum
7.4.1 Lampu PJU (setiap 100 m) 112 set Rp 16,334,071.43
7.4.2 Pondasi PJU 1.51 m3 Rp 550,200.00
7.5 Penanaman Rumput di Tepian Bahu Luar 43,977.23 m2 Rp 6,523.21
7.6 Pemasangan Guardrail 481.54 m' Rp 386,410.71
Total =
Sub Total Rencana Anggaran Biaya =
PPN 10% =
Grand Total Rencana Anggaran Biaya =
)

HARGA

Rp 1,978,582,119.56
Rp 83,147,221.43
Rp 24,116,376.43
Rp 1,462,018.94
Rp 96,434,891.48
Rp 956,442.00
Rp 5,751,700.00
Rp 5,405,508.00
Rp 24,346,882.50
Rp 444,979,880.00
Rp 1,640,000.00
Rp 8,739,400.00
Rp 80,209,760.00
Rp 3,460,000.00
Rp 40,205,000.00
Rp 350,000.00
Rp 449,182.72
Rp 106,000,000.00
Rp 2,906,236,383.05

Rp 89,578,044.74
Rp 148,072,490.29

Rp 998,572,813.84

Rp 796,347,621.05
Rp 469,185,269.31
Rp 342,346,303.16
Rp 2,844,102,542.39

Rp 4,743,300,931.31

Rp 894,887.47
Rp 79,038,432.65
Rp 4,823,234,251.43

Rp 178,244,782.28

Rp 1,658,175,126.74

Rp 1,693,153,785.16
Rp 8,657,697.00
Rp 264,685,225.35

Rp 432,530,544.27
Rp 2,000,000.00
Rp 8,802,615,080.32
Rp 556,964,803.19

Rp 37,039,423,904.02
Rp 17,766,758,542.33
Rp 525,081,308.19
Rp 68,928,290,798.86
Rp 50,000,000.00

Rp 35,383,309.26
Rp 14,131,908.71
Rp 29,721,723.85
Rp 54,344,772.95

Rp 3,808,106.88
Rp 12,040,452.61
Rp 22,598,624.76

Rp 15,978,277.03
Rp 3,999,749.89
Rp 9,913,013.56

Rp 14,373,601.32
Rp 17,896,904.44
Rp 51,446,905.71

Rp 291,213,266.52
Rp 16,475,479.66
Rp 55,208,960.69
Rp 13,633,585.71

Rp 212,839.87
Rp 221,712,054.65
Rp 44,175,743.04

Rp 946,276.00
Rp 7,593,137.92
Rp 5,163,511.19

Rp 4,770,177,750.00
Rp 5,919,494.87

Rp 362,743,400.00
Rp 35,283,993.12

Rp 686,661.76
Rp 240,247,877.51
Rp 210,897,107.14
Rp 60,743,787.28

Rp 75,449,413.52
Rp 55,735,643.46
Rp 58,949,579.46
Rp 50,000,000.00
Rp 6,918,806,914.34

Rp 9,855,819,973.81
Rp 71,716,217.86
Rp 28,261,262.96
Rp 9,955,797,454.63

Rp 78,797,587.88
Rp 183,861,038.38
Rp 183,861,038.38
Rp 53,521,584.13

Rp 16,098,381.29
Rp 10,268,581.97
Rp 27,382,885.26
Rp 208,179,259.97

Rp 1,828,435,955.71
Rp 831,456.74
Rp 286,872,924.17
Rp 186,071,442.54
Rp 3,064,182,136.42
Rp 99,440,650,481
Rp 9,944,065,048
Rp 109,384,716,000
RANCANGAN ANGGARAN BIAYA
PROYEK JALAN TOL JORR
RUAS JAGAKARSA - PASAR MINGGU
PT. RPA CONSTRUCTION

NO URAIAN PEKERJAAN HARGA


I Pekerjaan Persiapan Rp 2,906,236,383.05
II Pekerjaan Tanah Rp 2,844,102,542.39
III Pekerjaan Drainase Rp 4,823,234,251.43
IV Pekerjaan Konstruksi Jalan Rp 68,928,290,798.86
V Pekerjaan Konstruksi Jembatan Rp 6,918,806,914.34
VI Pekerjaan Median Rp 9,955,797,454.63
VII Pekerjaan Lain-lain Rp 3,064,182,136.42
Total = Rp 99,440,650,481
PPn 10% = Rp 9,944,065,048
Grand Total = Rp 109,384,716,000
1.3% 2.4% 3.2% 3.6% 4.1% 4.6% 5.2% 6.2% 7.9% 11.3% 14.6% 20.0% 25.0%
33.9% 47.1% 56.7% 65.0% 71.2% 75% 76.1% 77.1% 78.4% 79.2% 79.8% 81.0% 83%
85.3% 87.0% 89.0% 91% 93.2% 97% 99.3% 100%

Kode
A
B
C
D
E
F
G
H
Durasi
Kegiatan yang Kegiatan yang
Kegiatan (minggu
Mendahului Mengikuti
)
Pekerjaan Persiapan - B 2
Pekerjaan Tanah A C, D 4
Pekerjaan Gorong-gorong B E 1
Pekerjaan Konstruksi Jalan B E 11
Pekerjaan Drainase D F 4
Pekerjaan Konstruksi Jembatan E G 9
Pekerjaan Median F H 2
Pekerjaan Lain-lain G - 2
BARCHART JAD
Proyek Pembangunan Jalan Tol Jakarta Outering Road (JORR
PT. RPA CON

JANUARI FEBRUARI MARET


NO KEGIATAN
1 2 3 4 5 6 7 8 9 10 11
1 Air
2 Papan dan Kayu
3 Paku
4 Seng
5 Pasir dan Semen
6 Pipa Galvanis
7 Cat Kayu
8 Batu Bata Merah
9 Ubin Keramik
10 Batu Pecah
11 Gorong-gorong Precast
12 Saluran Beton Pracetak
13 Sirtu
14 Tulangan
15 Ready Mix K-100
16 Ready Mix K-225
17 Ready Mix K-275
18 Ready Mix K-300
19 Hotmix Lapis AC-WC Lokal
20 Elastomer
21 Girder Precast
22 Diafragma Precast
23 Median Concrete Barrier
24 Pertamanan
25 Cat Termoplastik
26 Glass Bead
27 Rambu-rambu
28 PJU
29 Guardrail

BARCHART JADW
Proyek Pembangunan Jalan Tol Jakarta Outering Road (JORR
PT. RPA CON
PT. RPA CON

JANUARI FEBRUARI MARET


NO TENAGA KERJA
1 2 3 4 5 6 7 8 9 10 11
1 Mandor
2 Tukang gali tanah
3 Kepala tukang kayu
4 Tukang kayu
5 Kepala tukang besi
6 Tukang besi terampil
7 Pekerja
8 Operator
9 Pembantu Operator
10 Sopir / Driver
11 Pembantu Sopir / Driver
12 Instalator
13 Pembantu Instalator

BARCHART
Proyek Pembangunan Jalan Tol Jakarta Outering Road (JORR
PT. RPA CON

JANUARI FEBRUARI MARET


NO TENAGA KERJA
1 2 3 4 5 6 7 8 9 10 11
1 Bulldozer
2 Excavator
3 Dump Truck
4 Wheel Loader
5 Motor Grader
6 Tandem Roller
7 Truck Mixer ###
###
###
###
###
###
###
###
###
###
###
###
###
###
8 Concrete Paver
9 Asphalt Finisher
10 Pneumatic Tyre Roller
11 Flat Bed Truck ###
12 Mobile Crane ###
13 Bor Tanah
14 Concrete Pump
15 Barrier Lift
16 Road Marking Machine
ARCHART JADWAL MATERIAL
ng Road (JORR) Ruas Jagakarsa - Pasar Minggu Sta. (0+000) – Sta. (5+496.435)
PT. RPA CONSTRUCTION

MARET APRIL MEI JUNI JULI


MINGGU KE
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

CHART JADWAL TENAGA KERJA


ng Road (JORR) Ruas Jagakarsa - Pasar Minggu Sta. (0+000) – Sta. (5+496.435)
PT. RPA CONSTRUCTION
PT. RPA CONSTRUCTION

MARET APRIL MEI JUNI JULI


MINGGU KE
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

BARCHART ALAT BERAT


ng Road (JORR) Ruas Jagakarsa - Pasar Minggu Sta. (0+000) – Sta. (5+496.435)
PT. RPA CONSTRUCTION

MARET APRIL MEI JUNI JULI


MINGGU KE
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

###
###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### ######
###
###
###
###
###
###
###
###
###
######
###
###
### ###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### ###
###
###
### ###
###
###
###
###
###
6.435)

AGUSTUS

30 31 32 33 34

6.435)
AGUSTUS

30 31 32 33 34

6.435)

AGUSTUS

30 31 32 33 34

###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Anda mungkin juga menyukai