A.016
A.017
A.018
A.019
A.020
A.021
3,500,000.00 A.022
1,400,000.00
B
B.001
B.002
700,000.00 B.003
B.004
B.005
10,500,000.00 B.006
14,000,000.00 B.007
B.008
B.009
6,650,000.00 B.010
1,100,000.00 B.011
B.012
DAFTAR B.013
MOBILISASI ALAT
HARGA B.014
SATUAN KETERANGAN B.015
( Rp.) B.016
B.017
B.018
B.019
B.020
B.021
B.022
B.023
B.024
B.025
B.026
B.027
B.028
B.029
B.030
B.031
B.032
B.033
B.034
B.035
B.036
B.037
B.038
B.039
B.040
B.041
B.042
B.043
B.044
B.045
B.046
B.047
B.048
B.049
B.050
B.051
B.052
B.053
B.054
B.055
B.056
C
C.001
C.002
C.003
C.004
C.005
FTAR C.006
PEKERJA C.007
UPAH (Rp.) KETERANGAN C.008
85,000 7 jam C.009
60,000 7 jam C.010
65,000 7 jam C.011
75,000 7 jam C.012
65,000 7 jam
45,000 7 jam D
75,000 7 jam D.001
65,000 7 jam D.002
50,000 7 jam D.003
75,000 7 jam D.004
65,000 7 jam D.005
50,000 7 jam
75,000 7 jam
65,000 7 jam
50,000 7 jam
55,000 7 jam D.006
85,000 7 jam
65,000 7 jam
50,000 7 jam D.007
43,000 7 jam
54,000 7 jam
47,000 7 jam
75,000 7 jam
65,000 7 jam D.008
D.009
D.010
D.011
D.012
D.013
D.014
D.015
D.016
D.017
D.018
D.019
D.020
D.021
D.022
D.023
D.024
D.025
D.026
D.027
D.028
D.029
D.030
D.031
D.032
E
E1
E1.001
E1.002
E1.003
E1.004
E1.005
E1.006
E1.007
E1.008
E1.009
E1.010
E1.011
E1.012
E1.013
E1.014
E1.015
E1.016
E1.017
E1.018
E1.019
E1.020
E1.021
E1.022
E1.023
E1.024
E1.025
E1.026
E1.027
E1.028
E1.029
E1.030
E1.031
E1.032
E1.033
E1.034
E1.035
E1.036
E2
E2.001
E2.002
E2.003
E2.004
E2.005
E2.006
E2.007
E2.008
F
F.001
F.002
F.003
F.004
F.005
F.006
F.007
F.008
G
G.001
G.002
G.003
G.004
G.005
G.006
G.007
G.008
G.009
G.010
G.011
G.012
H
H.001
H.002
H.003
H.004
H.005
H.006
H.007
H.008
H.009
H.010
H.011
H.012
H.013
H.014
H.015
H.016
H.017
H.018
H.019
H.020
H.021
H.022
H.023
H.024
H.025
H.026
H.027
H.028
H.029
H.030
H.031
H.032
H.033
H.034
H.035
H.036
H.037
H.038
H.039
H.040
H.041
H.042
H.043
I.1
I.1.001
I.1.002
I.1.003
I.1.004
I.1.005
I.1.006
I.1.007
I.1.008
I.1.009
I.1.010
I.1.011
I.1.012
I.1.013
I.1.014
I.1.015
I.1.016
I.2
I.2.001
I.2.002
I.2.003
I.3
I.3.001
I.3.002
I.3.003
I.3.004
I.3.005
I.3.006
I.3.007
I.3.008
I.3.009
I.3.010
I.3.011
I.3.012
I.3.013
I.3.014
I.3.015
I.3.016
I.4
I.4.001
I.5
I.5.001
I.5.002
I.5.003
I.5.004
I.5.005
I.5.006
I.5.007
I.5.008
I.5.009
I.5.010
I.5.011
I.5.012
I.5.013
I.5.014
I.5.015
I.5.016
I.5.017
J
J.001
J.002
J.003
J.004
J.005
J.006
J.007
J.008
J.009
J.010
J.011
J.012
J.013
J.014
J.015
J.016
J.017
J.020
J.021
J.022
J.023
J.024
J.025
J.027
J.028
J.029
K
K.001
K.002
K.003
K.004
K.005
K.006
K.007
K.008
K.009
K.010
K.011
K.012
K.013
K.014
K.015
K.016
L
L.001
L.002
L.003
L.004
L.005
M
M.001
M.002
M.003
M.004
M.005
M.006
N
N.001
N.002
O
O.001
O.002
O.003
O.004
O.005
O.006
O.007
O.008
O.009
O.010
O.011
P
P.001
P.002
P.003
P.004
P.005
P.006
P.007
P.008
P.009
P.010
P.011
P.012
P.013
P.014
P.015
P.016
P.017
P.018
P.019
P.020
P.021
P.022
P.023
P.024
P.025
P.026
P.027
P.028
P.029
P.030
P.031
P.034
P.035
P.036
P.037
P.038
P.039
P.040
P.041
P.042
P.043
P.044
P.045
P.046
P.047
P.048
P.049
P.050
P.051
P.052
P.053
P.054
P.055
P.056
P.057
P.058
P.059
P.060
P.061
P.062
P.063
P.064
P.065
P.066
P.067
Q
Q.001
Q.002
Q.003
Q.004
Q.005
Q.006
Q.007
Q.008
Q.009
Q.010
Q.011
Q.012
Q.013
Q.014
Q.015
Q.019
Q.020
Q.021
Q.022
Q.023
Q.024
Q.025
Q.026
Q.027
Q.028
Q.029
Q.030
Q.031
Q.032
Q.033
Q.034
R
R.001
R.002
R.003
R.004
R.005
R.006
R.007
S
T
U
U.001
U.002
U.003
U.004
U.005
U.006
U.007
U.008
U.009
U.010
U.011
U.012
U.013
U.014
U.015
U.016
U.017
U.018
U.019
U.020
U.021
U.022
U.023
U.024
U.025
U.026
U.027
U.028
U.029
U.030
U.031
U.032
U.033
U.034
U.035
U.036
U.037
U.038
U.039
U.040
U.041
U.042
U.043
U.044
U.045
U.046
U.047
U.048
U.049
U.050
U.051
U.052
U.053
U.054
U.055
U.056
U.057
U.058
U.059
U.060
U.061
U.062
U.063
U.064
U.065
U.066
U.067
U.068
U.069
U.070
U.071
U.072
U.073
U.074
U.075
U.076
U.077
U.078
U.079
U.080
U.081
U.082
U.083
U.084
U.085
U.086
U.087
U.088
U.089
U.090
U.091
U.092
U.093
U.094
U.095
U.096
U.097
U.098
U.099
U.100
U.101
U.102
U.103
U.104
U.105
U.106
U.107
V
Harga
Nama Barang
Satuan
PASIR DAN BATU
Pasir urug darat 135,000.00
Pasir pasang 185,000.00
Pasir Beton 177,000.00
Koral Beton 210,600.00
Batu Pecah/Split ukr. 1 - 2 cm 177,400.00
Batu Pecah/Split ukr. 2 - 3 cm 174,300.00
Batu Pecah/Split ukr. 3 - 4 cm 167,200.00
Batu Belah Pondasi 134,100.00
Abu Batu/Screening 5 mm 146,800.00
Macadam/Steel Slag ukr. 5 - 7 cm 130,000.00
Sirtu 162,000.00
Batu Tempel Hitam 135,000.00
Batu Palimanan
uk. 10 x 20 53,000.00
uk. 15 x 15 52,900.00
uk. 20 x 20 64,500.00
uk. 15 x 30 69,100.00
uk. 20 x 30 61,600.00
uk. 20 x 40 69,100.00
uk. 30 x 30 66,400.00
Batu Andesit
uk. 10 x 20 102,700.00
uk. 15 x 15 102,700.00
uk. 20 x 20 132,600.00
uk. 15 x 30 126,000.00
uk. 20 x 30 134,200.00
uk. 20 x 40 148,300.00
uk. 30 x 30 146,400.00
Batu Candi
uk. 10 x 20 80,000.00
uk. 15 x 15 79,400.00
uk. 20 x 20 83,600.00
uk. 15 x 30 80,500.00
uk. 20 x 30 80,800.00
uk. 20 x 40 86,300.00
uk. 30 x 30 86,800.00
Batu sikat 20 kg 75,300.00
Batu sikat 25kg 90,000.00
Batu sikat Alor 50 kg 251,700.00
Tanah Merah 54,400.00
Tanah untuk media tanam 73,800.00
Lapisan permukaan batu tulung agung 335,500.00
Karung 2,800.00
1. PAVING BLOK
Interblok. Blok Abu-abu type 4,6 ukr 6 x 10,5 x 21 41,000.00
Int. Blok Merah/Hitam type 4,6 ukr. 6 x 10,5 x 21 52,000.00
Int. Blok Abu-abu type 16,6 ukr 6 x 11,5 x 22,5 55,000.00
Kastin Abu-abu ukr. 10.20.40 K 300 37,400.00
Kastin Abu-abu ukr. 10.20.40 K 175 30,800.00
Paving Block K 350 Tebal 6 Abu-abu 48,600.00
Paving Block K 350 Tebal 8 Abu-abu 57,900.00
Topi uskup K.350 tebal 6 69,700.00
Topi uskup K.350 tebal 8 100,300.00
Paving Block K 250 Tebal 6 Abu-abu 43,100.00
Paving Block K 250 Tebal 8 Abu-abu 52,600.00
Topi uskup K 250 Tebal 6 63,000.00
Topi uskup K 250 Tebal 8 81,900.00
SEMEN / KAPUR
Semen Cibinong (Kujang) 50 kg 53,500.00
Semen Tiga Roda 50 kg 55,000.00
Semen Gresik 50 kg 53,500.00
Semen Holcim 50 kg 54,000.00
Semen Putih Tiga Roda 40 kg 73,000.00
Semen Warna 5,700.00
Bata merah 350.00
Bataco (bhn Semen + Pasir + Abu Batu) 1,700.00
Rooster Beton 20 x 20 x 7 cm 3,100.00
Rooster Bata Merah 12 x 24 x 11,5 cm 5,600.00
Tali-tali airpracetak 40 x 30 x 100 Cm 173,300.00
Batako Putih / Hebel 5,500.00
KAYU
Papan Kayu Kamper Kruing/ Medan/Banjar ukuran 3 x 20 / 30 x 400 3,500,000.00
Papan Kayu Kamper Singkil 3 x 20 / 30 x 400 4,750,500.00
Papan Kayu Meranti ukuran :2/3 x 20/30 x 400 2,450,000.00
Papan Kayu Terentang ukuran 2 x 20/30 x400 2,426,760.00
Papan Kayu Kamper Samarinda Oven :
4 x 30 x 400 5,939,600.00
3 x 30 x 400 5,938,300.00
4 x 25 x 400 5,786,200.00
3 x 20 x 400 5,741,700.00
Papan Kayu Kamper Singkil Oven :
4 x 30 x 400 5,250,300.00
3 x 30 x 400 5,275,200.00
Balok Kayu Kamper Singkil ukuran :
5/10 x 400 4,052,500.00
6/12 x 400 4,076,300.00
8/12 x 400 4,143,300.00
8/15 x 400 4,143,300.00
Balok Kayu Kamper Kruing/ Medan / Banjar ukuran 6/8 x 12/15 x 400 3,650,000.00
Balok Kayu Meranti Jambi/palembang ukuran 6/8 x 12/15 x 400 2,453,200.00
Balok Kayu Kamper samarinda ukuran 6/8, 12/15 x 400 4,900,000.00
Balok kayu jati 21,421,000.00
Balok Kayu Kamper Samarinda Oven :
6 x 12 x 400 5,714,000.00
8 x 12 x 400 5,714,000.00
6 x 15 x 400 5,741,000.00
8 x 15 x 400 5,741,000.00
Balok Kayu Kamper Singkil :
5 x 10 x 400 4,052,500.00
6 x 12 x 400 4,076,300.00
8 x 12 x 400 4,143,300.00
8 x 15 x 400 4,143,300.00
Kaso kayu Meranti Jambi/Palembang ukr. 4 x 6 , 5 x 7 x 400 2,283,300.00
Kaso Kayu Kamper Samarinda :
Ukuran : 4 x 6 x 400 5,326,300.00
Ukuran : 5 x 7 x 400 5,326,300.00
Ukuran : 6/12 x 400 4,737,500.00
Kaso Kayu Kamper Singkil :
4/6 x 400 4,039,400.00
5/7 x 400 4,039,400.00
Dolken Ø 5 - 7 cm ukr. 300 - 400 cm 15,500.00
Dolken Ø 8 - 10 cm ukr. 350 - 400 cm 17,850.00
List profil kamper 5 Cm 13,300.00
List Profil Kamper 2 cm 7,600.00
List Gypsum 7 cm 19,200.00
List Gypsum 10 cm 25,300.00
List Gypsum 12 cm 31,800.00
List Plin ukr : 8.5 x 1.4 cm 55,800.00
List Plin ukr : 10 x 2 cm 60,000.00
Kayu Bakar 37,800.00
Balok :
Meranti (6×12) 80,000.00
Meranti (8×12) 125,000.00
Borneo (6×12) 80,000.00
Borneo (8×12) 100,000.00
Kamper (6×12) 185,000.00
Kamper (8×12) 210,000.00
BETON
BUIS BETON
Buis Beton Ukuran .Ø 100 cm tanpa tulangan panjang 1,00 m K 400 546,500.00
Buis Beton Ukuran .Ø 100 cm tanpa tulangan panjang 1,00 m Lokal 358,500.00
Buis Beton Ukuran .Ø 80 cm tanpa tulangan panjang 1,00 m K 400 313,600.00
Buis Beton Ukuran .Ø 80 cm tanpa tulangan panjang 1,00 m Lokal 216,300.00
Buis Beton Ukuran .Ø 60 cm tanpa tulangan panjang 1,00 m K 400 272,500.00
Buis Beton Ukuran .Ø 60 cm tanpa tulangan panjang 1,00 m Lokal 146,100.00
Buis Beton Ukuran .Ø 50 cm tanpa tulangan panjang 1,00 m Lokal 112,200.00
Buis Beton Ukuran .Ø 40 cm tanpa tulangan panjang 1,00 m Lokal 84,800.00
Buis Beton Ukuran .Ø 30 cm tanpa tulangan panjang 1,00 m lokal 65,300.00
Buis Beton Ukuran .Ø 20 cm tanpa tulangan panjang 1,00 m Lokal 48,000.00
Buis beton bertulang panjang 1,25 m .uk. Ø 30 cm
Buis beton bertulang panjang 1,25 m .uk. Ø 40 cm
Buis beton bertulang panjang 1,25 m .uk. Ø 50 cm
Buis beton bertulang panjang 1,25 m .uk. Ø 60 cm
Buis beton bertulang panjang 2,50 m .uk. Ø 60 cm 498,400.00
Buis beton bertulang panjang 2,50 m .uk. Ø 70 cm 630,600.00
Buis beton bertulang panjang 2,50 m .uk. Ø 80 cm 779,200.00
Buis beton bertulang panjang 2,50 m .uk. Ø 90 cm 950,700.00
Buis beton bertulang panjang 2,50 m .uk. Ø 100 cm 1,129,000.00
Buis beton bertulang panjang 2,50 m .uk. Ø 110 cm 1,418,000.00
Buis beton bertulang panjang 2,50 m .uk. Ø 120 cm 1,795,000.00
Buis beton bertulang panjang 2,50 m .uk. Ø 130 cm 2,045,000.00
Buis beton bertulang panjang 2,50 m .uk. Ø 140 cm 2,265,000.00
Buis beton bertulang panjang 2,50 m .uk. Ø 150 cm 2,499,000.00
Box culvert ukuran 400x400 C & B
Box culvert ukuran 500x500 C & B
Box culvert ukuran 600x600 BC
Box culvert ukuran 800x800 BC
Box culvert ukuran 1000x1000 BC
Box culvert ukuran 1200x1200 C & B
Buis Beton Ukuran .1/2 Ø 100 cm tanpa tulangan panjang 1,00 m lokal 132,000.00
Buis Beton Ukuran .1/2 Ø 80 cm tanpa tulangan panjang 1,00 m lokal 121,300.00
Buis Beton Ukuran .1/2 Ø 60 cm tanpa tulangan panjang 1,00 m lokal 71,000.00
Buis Beton Ukuran .1/2 Ø 50 cm tanpa tulangan panjang 1,00 m lokal 67,300.00
Buis Beton Ukuran .1/2 Ø 40 cm tanpa tulangan panjang 1,00 m lokal 62,500.00
Buis Beton Ukuran .1/2 Ø 30 cm tanpa tulangan panjang 1,00 m lokal 42,500.00
Buis Beton Ukuran .1/2 Ø 20 cm tanpa tulangan panjang 1,00 m lokal 29,500.00
READYMIX
Readymix beton K-125 tanpa pompa 426,800.00
Readymix beton K-175 tanpa pompa 561,000.00
Readymix beton K-225 tanpa pompa 463,300.00
Readymix beton K-250 tanpa pompa 489,700.00
Readymix beton K-300 tanpa pompa 509,900.00
Readymix beton K-350 tanpa pompa 515,800.00
Readymix beton K-400 tanpa pompa 581,700.00
Pekerjaan sparator modifikasi pot span 1 m
JEMBATAN
Gerder POSTENSION WK termasuk STESSING
- L=35.80 m, H=160 cm
- Diafragma tengah
- Diafragma tepi
- RC Slab/Plat deck
Tiang Pancang WIKA (bulat) diameter 400 P : 12 m
- Bottom
- Midle
-Shet File
Test tiang pancang PDA
Pemancangan
Expantion joint Type Ruber 3
Elastomesik 500 x 400 x 50
Pipa sandaran diameter 3 "
Tiang Sandaran Galvanis
Railing Jembatan Antik
Tiang Pancang Bulat Diameter 500
Jembatan khusus pejalan kaki + aksesoris :
- Bangunan atas pipa baja tirus
- Bangunan bawah sumuran
Voided Slab (Masuk Jembatan) :
- VS 970/570 Bentang (L) 10,80 m, mutu beton K600
- VS 970/570 Bentang (L) 11,80 m, mutu beton K600
- VS 970/570 Bentang (L) 12,80 m, mutu beton K600
- VS 970/620 Bentang (L) 12,80 m, mutu beton K600
- VS 970/620 Bentang (L) 13,80 m, mutu beton K600
- VS 970/620 Bentang (L) 14,80 m, mutu beton K800
- VS 970/620 Bentang (L) 15,80 m, mutu beton K600
- VS 970/620 Bentang (L) 16,80 m, mutu beton K800
- VS 970/620 Bentang (L) 17,80 m, mutu beton K800
CAT
Cat Kayu setara Glotek 29,650.00
Cat Kayu setara F Talit 31,500.00
Cat Besi setara Glotek 29,650.00
Cat Besi setara F Talit 31,500.00
Cat tembok setara Jotun ( Interior ) 25,000.00
Cat tembok setara Jotun ( Exterior ) 37,000.00
Cat tembok setara Vinilex 12,000.00
Cat tembok setara Metrolite 10,500.00
Cat tembok setara Dulux / ICI ( Exterior ) 46,000.00
Cat tembok setara Dulux / ICI ( Interior ) 28,000.00
Cat dasar setara Dulux 30,000.00
Cat Dasar 5 kg 88,250.00
Cat kayu setara seiv 26,100.00
Cat besi setara seiv 28,500.00
Rool cat tembok 25,700.00
Kwas 3" 14,200.00
Oker 8,600.00
Spirtus 7,000.00
Bahan pelitur Kripik ( sirlak india) 59,500.00
Dempul plitur 26,200.00
Dempul halus/Infra 25,700.00
Terpentin 5,000.00
Thiner A 15,300.00
Thiner B 16,000.00
Melamik 33,800.00
Ampelas Besi 15,000.00
Plamur Tembok setara Matek/Metrolite 11,500.00
Plamur Kayu/Dempul Kayu 19,000.00
Pelamir Tembok 8,700.00
Residu 7,800.00
Meni Kayu setara Nippon 15,700.00
Meni Besi setara Nippon 15,250.00
Pelitur 34,500.00
Minyak Cat/Tinner 15,000.00
Vernis Bee Brand 66 (kayu/besi) 29,700.00
Amplas Kayu 4,500.00
Soda Api 23,900.00
Sapu Lidi 5,650.00
Minyak Tanah 3,000.00
Minyak Tanah Industri 3,500.00
Ijuk 6,250.00
Pelumas 21,800.00
Minyak Solar 6,000.00
Lem Putih 15,000.00
LANTAI
Ubin Keramik Ukr. 10x20 Standar KW 2 34,700.00
Ubin Keramik Ukr. 10x20 Standar KW 1 37,000.00
Ubin Keramik Ukr. 20x20 Standar KW 2 32,200.00
Ubin Keramik Ukr. 20x20 Standar KW 1 41,500.00
Ubin Keramik Ukr. 20x25 Standar KW1 41,800.00
Ubin Keramik Ukr. 20x25 Standar KW2 35,200.00
Ubin Keramik Ukr. 30x30 Standar KW 2 40,000.00
Ubin Keramik Ukr. 30x30 Standar KW 1 43,700.00
Ubin Keramik Ukr. 40x40 Standar KW 2 45,700.00
Ubin Keramik Ukr. 40x40 Standar KW 1 51,300.00
Ubin Keramik 10x20 dan 20x20 KW1DN Standar 39,800.00
Ubin Keramik 10 x 25 Standar KW 2 37,300.00
Ubin Keramik 20 x 25 Standar KW 1 37,000.00
Ubin Keramik 30x30 KW1 DN warna/corak/anti slip 42,900.00
Plint Keramik Standart 10 x 20 cm 7,000.00
Border Keramik Dinding 7 x 20 37,500.00
TERAKOTA (Lantai Garasi / Teras)
Lantai Parkit Standar 104,900.00
Lantai Parkit Ukr 8 x 25 cm merk KIA 11,500.00
Lantai Parkit Ukr 7 x 20 cm merk Cina 23,800.00
MARMER
Ubin Marmer Bandung 90x60x2 cm
Ubin Marmer Bandung 60x60x2 cm
Ubin Marmer Bandung 60x40x2 cm
Ubin Marmer Bandung 60x30x2 cm
Ubin Marmer Bandung 40x40x2 cm
Ubin Marmer Bandung 40x30x2 cm
Ubin Marmer Bandung 30x30x2 cm
Ubin Marmer Bandung 30x10x1 cm
Ubin Marmer Lampung Cristaline 90x60x2 cm
Ubin Marmer Lampung Cristaline 60x60x2 cm
Ubin Marmer Lampung Cristaline 60x40x2 cm
Ubin Marmer Lampung Cristaline 60x30x2 cm
Ubin Marmer Lampung Cristaline 40x40x2 cm
Ubin Marmer Lampung Cristaline 10x60x2 cm
Ubin Marmer Lampung Cristaline 10x40x2 cm
Ubin Marmer Lampung Cristaline 10x30x2 cm
GRANIT
Granito Mirogranit
ALAT PENGUNCI
Engsel Pintu Nilon ukuran 3" 17,300.00
Engsel Pintu Nilon ukuran 4" 21,000.00
Engsel Stainless Stell setara YANK 3" 16,800.00
Engsel Stainless Stell setara YANK 4" 23,800.00
Engsel Piano (RRC) 23,100.00
Grendel setara Dekon/Poloma ukuran 3" 13,000.00
Grendel setara Dekon/Poloma ukuran 4" 16,500.00
Kunci Double Sloog setara Poloma 150,000.00
Engsel Stainless Steel setara Solid uk. 3" 26,000.00
Engsel Stainless Steel setara Solid uk. 4" 50,000.00
Engsel Stainless stell setara Dekon/Poloma uk. 3" 29,600.00
Engsel Stainless stell setara Dekon/Poloma uk. 4" 43,000.00
Grendel setara Solid ukuran 3" 17,000.00
Grendel setara Solid ukuran 4" 27,000.00
Kunci Double Sloog Solid 214,000.00
Gembok 60mm merk AXEL 58,200.00
Kunci tanam lengkap ( handle + kunci ) 150,000.00
Engsel pintu 35,000.00
Engsel jendela 25,000.00
Grendel tanam pintu doble 125,000.00
Hak angin 35,000.00
Grendel jendela 35,000.00
CLOSET DUDUK
Closet Duduk CW 660 J/ SW 660 J Rough - in : 230 m 2,187,700.00
Closet Duduk CW 420 J/ SW 516 JPTA Rough - in : 500 m 2,184,700.00
Closet Duduk Asi Dublo Scala 6 liter 611,700.00
Closet Duduk TOTO 6 liter 1,315,000.00
Closet Duduk INA 6 liter 952,000.00
CLOSET JONGKOK
Colset Jongkok Merk Toto Tipe Standar 232,700.00
Type C-1 Warna Standar ( Merk INA) 269,700.00
Type C-1 Warna Maroon (Merk INA) 251,000.00
Type C-14 Warna Standar (merk INA) Type C14/17 287,800.00
Type C-14/17 Warna Maroon (Merk INA) 388,000.00
Type C-16 Warna Standar (Merk INA) 302,500.00
BAK
Bak mandi Alco Piber :
a. Ukuran 65 x 65 cm 191,700.00
b. Ukuran 56 x 56 cm 127,200.00
Bak Penampung Air / Tower Tanx Merk Excel Cap. 700 ltr
Kapasitas 700 ltr 915,000.00
Kapasitas 500 ltr 768,100.00
Kapasitas 1000 ltr 1,370,000.00
KACA (Ex. ASAHI MAS)
Kaca bening 2 mm 57,250.00
Kaca bening 3 mm 43,000.00
Kaca bening 5 mm 92,600.00
Kaca bening 8 mm 132,000.00
Kaca bening 10 mm 173,300.00
Kaca Es 3 mm 74,250.00
Kaca Es 5 mm 101,550.00
Kaca Rayben 5 mm 100,600.00
Kaca Rayben 8 mm 212,500.00
Kaca Rayben 10 mm 292,000.00
Kaca Rayben 12 mm 357,100.00
ATAP
Genteng Kodok, Plentong Natural 1,400.00
Bubungan Genteng Kodok Plentong Natural 3,000.00
Genteng plentong ex. Jatiwangi 900.00
Bubungan Genteng ex. Jatiwangi 3,100.00
Genteng beton warna 3,800.00
Bubungan Genteng Beton 5,700.00
Genteng Morando 1,800.00
Genteng Beton Polos 3,000.00
Bubungan Genteng Marundo 3,500.00
Bubungan Genteng Marundo Glasur 5,000.00
Bubungan Glasur Pelita 5,100.00
Genteng List plang Marundo Glasur setara Pelita 5,900.00
LISTRIK MEKANIKAL
NYM 300/500 V, SNI.04-02698,SPLN 42-2, GT KABEL
1. 2X2,5 mm2
2. 2X1,5 mm2
3. 3X1,5 mm2
4. 4X1,5 mm2
5. 3X2,5 mm2
NYR/FGBY 0.6/1kV, SNI.04-02700, SPLN 43-2, IEC 60502-1 GT.KABEL
1. 4X10 mm2
2. 4X25 mm2
3. 4X35 mm2
4. 4X50 mm2
5. 4X16 mm2
KABEL PILIN (TWISTED CABLE)
1. 2X16 mm2
2. 4X16 mm2
3. 4X25 mm2
4. 4X35 mm2
5. 2X10 mm2
KABEL NYY SPLN
1. Kabel NYY 3 x 4
2. Kabel NYY 4 x 1,5
3. Kabel NYY 7 x 1,5
TIANG PJU DAN PERLENGKAPANNYA
1. Tiang PJU Tanam PRESS BOTTLE
a. H = 9 M Uk.5''.4".3".2" - 200 kg
b. H = 10 M Uk.5".4".3".2"
c. H = 11 M Uk. 6".5".4".2,5" - 240 kg
2. Tiang PJU Galvanis Octagonal Cabang 1
a. H = 10 M
b. H = 11 M
c. H = 12 M
3. Tiang PJU Galvanis Octagonal Cabang 2
a. H = 10 M
b. H = 11 M
c. H = 12 M
4. Stang Ornamen 2" GALVANIS tanpa Sok
a. L = 1 M
b. L = 1,5 M
c. L = 2 M
d. L = 2,5 M
e. L = 3 M
f. L = 5 M
g. L = 6 M
5. Stang Ornamen 2" GALVANIS dengan Sok
a. L = 1,5 M
b. L = 2 M
c. L = 2,5 M
d. L = 3 M
e. L = 5 M
f. L = 6 M
6. Tiang PJU Galvanis Octagonal Cabang 4
a. Tiang Lampu Sorot 10 m
b. Tiang Lampu Sorot 11 m
c. Tiang Lampu Sorot 12,
7. Tiang Lampu Taman
a. Tiang Lampu Antik Cab. 1 lengkap
b. Tiang Lampu Taman Cab. 2 lengkap
c. Tiang Lampu Neon / TL
d. Tiang Lampu Antik HPIT + Base Plate
PHB (Panel Hubungan Bagi)
PHB Induk Ukuran 130 x 80 x 50 2,105,400.00
PHB Induk Ukuran 80 x 60 x 40 960,000.00
PHB 60x50x30 600,000.00
PHB 20x30x40 227,300.00
Box Panel KWH Meter 70 x 50 x 40 660,200.00
NFB 100 A
Time Switch 6 Ampere Digital
Kunci Gembok Pernekel 60 mm
Flasher 25 A
Photo Cell 220/6 A
Relay 220 V, 10 A
MCB 6 A, 10 A 45,200.00
MCB 32 A 40,000.00
Timer Contactor Digital 100A
Contaktor 25 A
Contactor 100 A / 125 A
Koil Kontraktor 100 A
NH Fuse 63 A
NH Fuse 50 A
Holder Fuse
NH Fuse 100 A
NH Fuse 250A
Fatron 63 A Lengkap
Saklar, Broco 10,800.00
Flat Tembaga
Ground 30 QA
Lampu Indikator
Kabel Schunt/Sepatu Kabel Cu 25, 35 mm
Kabel Schunt/Sepatu Kabel Cu 50 mm
NFB 100 A - 125 A
Tralis/Karangkeng Pengaman Box panel PJU
Ukuran : P = 1,70 M, L = 0,65 M, T = 1,35 M
Tralis/Karangkeng Pengaman Box panel PJU
Ukuran : P = 0,85 M, L = 0,65 M, T = 1,35 M
ARMATUR LAMPU dan Komponennya
Armatur SPP 368/250 watt silver
Armatur HRX 811/250 Watt
Armatur HRX 811 Kecil
Armatur SRP 810/70 watt silver
Armatur SMF 383/400 watt
Armatur SMF 383/250 watt
Armatur TRX 800
Armatur Lengkap Merrcury 250 Watt
Armatur Lengkap Merrcury 125 Watt
Cover Lampu Taman Mika / Acrilic
Ballast untuk Lampu Mercurry
a. Ballast 250 Watt
b. Ballast 125 Watt
Ballast untuk Lampu SON, HPIT dan TL
a. Ballast 250 Watt
b. Ballast 70 Watt L 202
c. Ballast HPIT 400 Watt
d. Ballast SON T 1000 Watt
e. Ballast & Timer Dimming System
f. Ballast BTA 18L05 LW Insert
Capasitor type 7 uf/250 V
Capasitor
- Capasitor 250 Watt (32UF)
- Capasitor 400 Watt (50UF)
- Capasitor 70 Watt (12UF)
Ignitor
- Ignitor 70 - 600 Watt SN 58
- Ignitor 1000 Watt SN 59
- Ignitor HPIT 400 WS 1 - 51
Fitting Keramik E 27
Fitting Keramik E 40
Lampu ML 160 Watt 55,000.00
Lampu SON 250 Watt 143,000.00
Lampu SON 70 Watt 93,500.00
Lampu SON I 70 Watt 101,200.00
Lampu SON T 1000 Watt 618,200.00
Lampu Mercurry 250 Watt 66,000.00
Lampu HPIT 400 Watt 260,700.00
Lampu Mercurry 125 Watt 38,500.00
Lampu Cabang Hias Pohon 759,600.00
Lampu Cabang Hias Tiang 673,850.00
Lampu Selang Gedung Per 10 M 542,500.00
Control TTL ( Lampu Lalu Lintas ) 42,476,500.00
Control Warning Light 10,320,000.00
Box Lampu 3 Aspek Diameter 20 Cm 3,223,500.00
Box Lampu 2 Aspek Diameter 20 Cm 2,149,000.00
Tiang Lengkung Galvanis 2,509,500.00
Tiang Lurus / Pendek Galvanis 1,480,500.00
Tiang Rambu Diameter 2, Pajang 4 Meter 381,000.00
Tiang Rambu Diameter 2,5 , Pajang 4 Meter 463,250.00
Tiang Rambu Diameter 3 , Pajang 4 Meter 1,083,000.00
Terminal Kabel 20,250.00
Rambu Standar Tiang 4m, 2" dgn Panel 60 cm Terpasang 740,300.00
Rambu Standar Tiang 4m, 2" dgn Panel 60 cm dan Papan Tambahan Terpasang 823,550.00
Papan Nama Jalan Tiang 3m 2" Terpasang 619,600.00
Rambu Tiang Mode F, Tiang 6 m, 4" dgn papan Tambahan Terpasang 5,340,350.00
Rambu Tiang Mode F, Tiang 6 m, 4" Tanpa Papan Tambahan Terpasang 4,950,850.00
RPPJ Model Kupu-kupu Tiang 7m, 6" dengan Panel 120 cm x 180 cm, Terpasang 7,379,500.00
RPPJ Model Kupu-kupu Tiang 7m, 4" dengan Panel 120 cm x 180 cm, Terpasang 7,379,500.00
RPPJ Model F Tiang 7m, 4" dengan Panel 160 cm x 240 cm, Terpasang 4,465,500.00
Panel Rambu Diameter 90 cm, dengan Plat Alumunium Tebal 1,8 mm (Full) 846,250.00
Panel Rambu Diameter 75 cm, dengan Plat Alumunium Tebal 1,8 mm (Full) 573,000.00
Panel Rambu Diameter 60 cm, dengan Plat Alumunium Tebal 1,8 mm (Full) 380,500.00
ALAT-ALAT BANTU
1. Stoping Buckle / link
2. Strain Wedge Clamp SCW 25-35
3. Stainless Stell Strap 0,7x20x50 mm
4. Stoping Plate
5. Klem Stang Ornamen t = 4 mm Lengkap
6. Isolasiband Unibell besar
7. Jointing 35 mm
8. Stop Conector
9. Wedge Clamp SCW 10-16
10. Pipa Galvanis 2" - 6 m Medium
11. Pipa PVC 2"
12. Pipa PVC 1/2 "
Patok Km 75,000.00
14. Cermin Lalu Lintas, Diameter 100 cm
15. Road Stud (Paku Marka)
Deliniator Plastik 15,000.00
17. Traffic Cones
- Impor
- Lokal
18. Marka Lajur
19. Zebra Cross
20. Pita Penggaduh ( Rubber Short )
21. Bola Lampu 60 Watt (Khusus Traffic Light)
22. Tambang Nilon
23. Gergaji Besi
24. Gergaji Mesin Ukr. Kecil type merk STIHL MS 380.72,2cc
25. Gergaji Mesin type merk STIHL MS 0,70. 106cc
26. Rantai gergaji 0.70
27. Rantai gergaji merk Steel 380
28. Pisau Tempa
29. Pisau Cutter
30. Sarung Tangan
31. Sabuk Pengaman
32. Tang
33. Mata Gergaji
34. Palu 1 kg
35. Martil palu Besi Ukr. Besar 5 Kg merk Bodem 10 LBS
36. Martil palu Besi Ukr. Besar 10 Kg merk Bodem 10 LBS
Klem
Klem Galvanis
Dop Galvanis 3"
Rantai Besi
Tang Potong Merk Tekiro
Tambang Dadung 1/2 Inch
PEMIPAAN
Tanki HU
Tanki HU (kap. 3 m3) PE 5,526,000.00
Tanki HU (kap. 3 m3) Fiber 5,928,600.00
Tanki HU (kap. 4 m3) 6,451,300.00
Ball Valve 1 inch (KW2). Bronze 222,900.00
Rantai dan Kunci pengaman Valve 1" 71,200.00
Shock drat Dalam 1 inch (PVC) 8,400.00
Shock drat Luar 1 inch (PVC) 8,300.00
Shock dart Dalam 3/4" (GIP) 9,300.00
Pipa PVC dia. 4 inch, klas D 23,300.00
Pipa PVC dia. 6 inch, S-12,5 154,500.00
Pipa PVC dia. 4 inch, S-12,5 75,600.00
Pipa PVC dia. 3 inch, S-12,5 60,000.00
Pipa PVC dia. 2 inch, S-12,5 48,300.00
Pipa PVC dia. 2 inch, S-10 49,800.00
Pipa PVC dia. 1 inch, S-12,5 8,200.00
Pipa PVC dia. 3/4 inch 5,000.00
Pipa Galv Hitam (Medium) dia 8 inch 403,800.00
Pipa Galv Hitam (Medium) dia 6 inch 278,600.00
Pipa Galv Medium dia 6 inch 333,500.00
Pipa Galv Medium dia 4 inch 219,400.00
Pipa Galv Medium dia 3 inch 189,300.00
Pipa Galv Medium dia 2 inch 112,200.00
Pipa Galv Medium dia 3/4 inch 37,400.00
Pipa PVC Pelindung Kabel 48,500.00
Pipa Besi Pengaman Kabel PLN 109,900.00
Gate Valve 6 inch, double flanged, CI, PN 10
Gate Valve 4 inch, double flanged, CI, PN 10
Gate Valve 3 inch, double flanged, CI, PN 10
Gate Valve 2 inch, double flanged, CI, PN 10
Box Valve/street 4 inch
Loose Flange 6" PN 10 (Steel)
Loose Flange 4" PN 10 (Steel)
Loose Flange 3" PN 10 (Steel)
Loose Flange 2" PN 10 (Steel)
Water Mur dia 3/4" 7,300.00
Floating Valve dia 3/4" 85,700.00
Angker dia 1/2" 35,500.00
Meter Air 3/4" 767,500.00
Rumah Meter 118,900.00
Dudukan 33,200.00
Ball Valve 3/4", Bronze
Double niple 3/4" Gl
Plug Valve 3/4" (+segel kran)
Feet Valve 3/4" (CI)
Check Valve 3/4", GI
Giboult Joint 8" (for PVC) (CI)
Giboult Joint 6" (for PVC) (CI)
Giboult Joint 4" (for PVC) (CI)
Giboult Joint 3" (for PVC) (CI)
Giboult Joint 2" (for PVC) (CI)
Air Vent Valve 1" (Screw Outside)
Air Vent Valve 3/4" (Screw Outside)
Elbow 3/4" PVC, 90
Elbow Gl 6", 45
Elbow all flange CI 4", 45
Elbow all flange CI 2", 45
Elbow all socket PVC 6", 90
Elbow all socket PVC 6", 45
Elbow all socket PVC 6", 22,5
Elbow all socket PVC 4", 90
Elbow all socket PVC 4", 45
Elbow all socket PVC 4", 22,5
Elbow all socket PVC 3", 90
Elbow all socket PVC 2", 90
Elbow all socket PVC 2", 45
Tee all flange (CI) 100 x 50 mm
Tee all socket 200 x 50 mm
Tee all socket 150 x 150 mm
Tee all socket 150 x 100 mm
Tee all socket 150 x 75 mm
Tee all socket 150 x 50 mm
Tee all socket 100 x 100 mm
Tee all socket 100 x 75 mm
Tee all socket 75 x 75 mm
Tee all socket 75 x 50 mm
Tee all socket 100 x 50 mm
Tee SC 50 x 50 mm
Reducer PVC 100 x 75 mm
Reducer PVC 75 x 50 mm
Clamp Saddle 4"
Clamp Saddle 3"
Clamp Saddle 2"
Flanges sc/sp 6" (CI/PVC)
Flanges sc/sp 4" (CI/PVC)
Flanges sc/sp 3" (CI/PVC)
Flanges sc/sp 2" (CI/PVC)
End Cap 6"
End Cap 4"
End Cap 3"
End Cap 2"
IWF ex Japan
Besi Profil ex DN SII
Seal Tape 8,500.00
Lem PVC 6,100.00
Karet Seal 1 inch 5,300.00
Gerobak Air (dorong) kap. 4 unit jerigen
Rantai dan kunci pengaman gerobak
Pompa Angin 65,000.00
Jerigen 20 lt. Mat PP/PE
Jerigen 10 lt. Mat PP/PE
Slang Plastik serat pj. 2,5 m + nozzle 1/2" 73,050.00
Bensin 4,500.00
Cat Marka / Thermoplastik 45,800.00
Glass Bit 24,750.00
Plastik 2,250.00
Giotextile 33 gr 30,000.00
PERTAMANAN
RUMPUT ( LAWN )
1. Rumput embun (Polytrias sp) lempeng 8,000.00
2. Rumput Gajah (Axonopus sp)
- Tandur 6,000.00
- Lempeng,jarak Lempeng + 2 cm 9,500.00
3. Rumput Golf (Tifton grass) tandur 12,100.00
4. Rumput Manila (Zoysia Matrela), jarak lempeng 2 Cm 7,900.00
5. Rumput Manila (Zoysia Matrela), tandur 7,950.00
PERDU
1. Agave putih (Ageve sp) tinggi 40 cm 13,500.00
2. Agave biasa (Ageve sp) tinggi 50 cm 14,000.00
3. Bugenvil hawai (bougainvillea sp) tinggi 60 cm 25,000.00
4. Mawar putih (rosa hybrida) tinggi 25 cm 5,600.00
5. Mawar Merah (rosa hybrida) tinggi 30 cm 12,770.00
6. Melati costa (jasminum sp) tinggi 50 cm 12,800.00
7. Melati gambir (jasminum sp) tinggi 50 cm 6,800.00
8. Soka Bangkok (Ixora sp) tinggi 20 cm 5,800.00
9. Soka Jepang bunga orange (Ixora sp) tinggi 20 cm 5,800.00
10. Soka philipina (Ixora sp) tinggi 20 cm 6,500.00
11. Soka siantan (Ixora sp) tinggi 20 cm 5,600.00
12. Soka singapuran (Ixora sp) bunga putih, pink, merah, tinggi 20 cm 3,200.00
13. Soka jawa/hawai (Ixora sp) tinggi 30 cm 3,200.00
14. Blue Eye
15. Herbras merah
16. Plumbago
17. Lili brazil putih
18. Crosandra
19. Bayam merah
20. Airis
21. Pandan duri kuning
22. Bakung air mancur
23. Canna
TANAMAN PAGAR
1. Kedondong laut (Nothopanax sp) tinggi 60-75 cm 20,100.00
2. Kemuning Murraya paniculata) tinggi 75 cm 14,200.00
3. Lantana pagar (lantana camara) tinggi 30 cm 3,750.00
4. Mangkokan (Nothopanax sp) tinggi 50 cm 6,400.00
5. The-tehan (Durantha repens) tinggi 50 cm 1,900.00
TANAMAN HIAS
1. Beringin bonsai (Ficus) tinggi 100 - 200 cm 96,500.00
2. Beringin bonsai bentukan (Ficus benjamina ), tinggi 100 - 200 cm 191,785.00
3. Beringin bonsai putih (Ficus benjamina ), tinggi 100 - 200 cm 536,635.00
4. Bonsai serut tinggi 100 - 150 cm 330,966.00
5. Bonsai serut tinggi 151 - 200 cm 508,680.00
6. Nusa indah merah / putih (Nussaenda sp) tinggi 50 cm 11,700.00
7. Pakis kelabang hijau Neprolephis sp) tinggi 40 cm 5,900.00
8. Pakis kelabang kuning Neprolephis sp) tinggi 40 cm 6,150.00
9. Pisang kipas (Revenela Madagaskariensis), tinggi 200 - 250 cm 27,300.00
10. Kamboja Kuning (Bali) tinggi 150 - 200 cm 430,000.00
11. Kamboja orange tinggi 150 - 200 cm 430,000.00
PALEM
1. Kelapa gading tinggi 200-250 cm 343,390.00
2. Kelapa sayur tinggi 200-250 cm 316,000.00
3. Kurma tinggi > 100 2,550,000.00
4. Kurma tinggi 100 1,775,000.00
5. Palm anggur tinggi 100 155,500.00
6. Palm botol diameter tinggi 150-200 230,900.00
7. Palm jepang (Ptychosperma macarthurii), tinggi 150 - 250 cm 85,000.00
8. Palm kuning (Chrysalidicarpus lutescens), tinggi 100 - 150 cm 20,100.00
9. Palm merah (Cyrtotachis lakka) tinggi 150 - 200 cm 84,000.00
10. Palm merah (Cyrtotachis lakka) tinggi 300 - 350 cm 155,000.00
11. Palm phoenik (Phoenik sp) tinggi 75 - 100 cm 88,900.00
12. Palm phoenik (Phoenik sp) tinggi 150 - 200 cm 257,500.00
13. Palm Raja (Oredoxa regia) Tinggi 100-200 cm 193,000.00
14. Palm Raja (Oredoxa regia) Tinggi 200-300 cm 301,500.00
15. Palm Ratu tinggi 100 - 150 cm 79,500.00
16. Pinang sirih (Areca catechu) tinggi 200 cm 83,600.00
TANAMAN BUAH-BUAHAN
1. Aren (Arenga catecu) tinggi 100 cm
2. Belimbing (Averhoa carambola) tinggi 75 cm
3. Bintari tinggi 150 cm
4. Durian (Durio zibethinus) tinggi 100 cm
5. Jamblang tinggi 300-400 cm
6. Jambu air (Eugenia aquea) tinggi 400-500 cm
7. Jambu Bol (Eugenia malaccensis) tinggi 100 cm
8. Jambu Mawar (Eugenia Jambos ) tinggi 100 cm
9. Kantil (Michelia champaca) tinggi 100 cm
10. Kecapi (sandoricum koetjape) tinggi 150 cm
11. Kedondong (Spondias pinnata) tinggi 500 cm
12. Kenanga (Cananga odorata) tinggi 50 cm
13. Kelengkeng tinggi 100 cm
14. Lobi-lobi (Flacourtia inermis) tinggi 150 cm
15. Melinjo (Gnetum gnemon) tinggi 500 cm
16. Nangka (Artocarpus heterrophyllus) tinggi 100 cm
17. Pala tinggi 200 - 300 cm
18. Petai tinggi 300 - 400 cm
19. Rambutan tinggi 50 cm
20. Salam tinggi 200 - 300 cm
21. Sawo kecik (Manilkara kauki) tinggi 200 cm
22. Sawo Kecik (Manilkara kauki) tinggi 300 - 400 cm
23. Serikaya tinggi 50 cm
POHON PELINDUNG
Angsana (Pterocarpus Indikus)
Asem Keranji (Pithecelluobium dulce)
Biola cantik
Buni
Batavia
Beringin (Ficus benjamania) Tinggi 150 - 200 cm
Bisbul (Diospyros dicolor)
Bunga kupu-kupu (Bauhinia purpurea)
Bunga saputangan (Amherstia nobilis) Tinggi 150 - 200 cm
Bungur (Lagerstromea loudonii) Tinggi 200 - 300 cm
Cassia glauca
Cempaka kuning (Michelia champaca) Tinggi 150-200 cm
Ceremai
Dadap hutan (Erythrina sp)
Damar (Agathis alba) Tinggi 150 cm
Flamboyant Delonix regia)
Gemelina
Glauka
Glodogan
Glodogan (Polyalthea longifolia) Tinggi 150 - 200 cm
Jatimas
Jakaranda (Jacaranda acutifolia)
Johan
Kamboja Putih (Plumeria rubra)
Kamoja Rantai
Karet kebo
Kasia bunga kuning (Cassia)
Kastuba (Euphorbia pulcherrima )
Kayu manis (Cinnamon bumanni) tinggi 200cm
Kayu putih (Maleucaa leucandendron)
Kembang kupu-kupu (Bauhinia pupurea)
Kembang Sepatu Kuning
Kenari, Tinggi 100 - 150
Ketapang, Tinggi 150 - 200
Kiara payung, Tinggi 150 - 200
Kurma, Tinggi 50
Mahoni, Tinggi 300 - 400
Mangga
Salam, Tinggi 50 - 100
Sikat Botol, Tinggi 200 - 300
Sawo Duren, Tinggi 150 - 200
Sawo Kecik, Tinggi 200
Tanjung Tinggi 200 - 300
Trembesi, Tinggi 200
Walisongo, Tinggi 200
Waru 2-3 m
BENIH
Bixa Diameter 1 Cm
Bunga Kupu-kupu Diameter 1 Cm
Bungur Diameter 1 Cm
Buni Diameter 1 Cm
Glodongan Diameter 1 Cm
Mahoni Diameter 1 Cm
Salam Diameter 1 Cm
Tanjung Diameter 1 Cm
Trembesi Diameter 1 Cm
MATERI PELENGKAP
Batu Api Besar/Sedang Tinggi 25 - 50 Cm 52,500.00
Batu Ares 18,000.00
Batu Bintang 27,750.00
Batu Brojol Hitam Bengkulu 32,750.00
Batu Cadas Besar / Sedang Tinggi 50 Cm 22,500.00
Btu Kayu Besar/Sedang Tinggi 50 Cm 50,250.00
Batu Tempel Cirebon Alam berbagai jenis ukuran, diameter 8 x 20 22,250.00
Batu Tulang Besar/Kecil 37,000.00
Gentong Teratai Sedang 100,000.00
Kromb. Dolken segitiga kawat duri 17,000.00
Pot Plastik diameter terra cotta clarris 128,000.00
Pot californian shell dari GK 999,000.00
Pot Grapevine dari GK 1,007,500.00
Pot Athena dari GK 947,500.00
Pupuk Majemuk butir - prill 6,000.00
Pupuk Kandang 12,500.00
Pupuk Kompas 4,500.00
Pupuk NPK 6,700.00
Pupuk TSP 7,700.00
Pupuk Area 5,300.00
Pupuk ZA 6,600.00
Serbuk Gergaji 7,600.00
Steger Bambu bulat/dolken 4,800.00
PEMELIHARAAN TAMAN
Angkut sampah sistim door to door
Angkut sampah sistim tidak langsung
Jasa pemeliharaan/perawatan
Pembersihan sampah di lokasi air mancur
Pengangkutan sampah
Penyapuan sampah
Pohon Di Halaman
a. Penyiraman
b. Pemberantasan Hama dengan insektisda
c. Pemupukan
d. Pendangiran
Pohon dalam Pot
a. Penyiraman
b. Pemberantasan Hama dengan insektisda
c. Pemupukan
d. Pendangiran
Rumput
a. Penyiraman pd lokasi taman yg mempunyai sumber air
b. Penyiraman pd lokasi taman tanpa sumbe air
c. Pengetrikan ditaman/berm
d. Pembabatan
e. Pembabatan rumput liar/alang-alang
Tanaman Hias dan Perdu
a. Penyiraman
b. Pemberantasan hama dengan insektisida
c. Pemangkasan
d. Pemupukan
e. Pendangiran
btg I SALURAN
btg 1 Saluran Beton Pracetak Dim 50-50
btg 2 Saluran Beton Pracetak Dim 50-70
btg 3 Penutup Saluran Beton Pracetak Dim 50
btg 4 Saluran Beton Pracetak Dim 60-70
btg 5 Penutup Saluran Beton Pracetak Dim 60
6 Saluran Beton Pracetak Dim 100-100
7 Penutup Saluran Beton Pracetak Dim 100
8 Box Culvert Pracetak Dim. 50-50
m1 9 Box Culvert Pracetak Dim. 60-60
m1 10 Box Culvert Pracetak Dim. 80-80
m1 11 Box Culvert Pracetak Dim. 100-100
m1 12 Box Culvert Pracetak Dim. 150-150
m1 13 Box Culvert Pracetak Dim. 200-200
m1 14 Box Culvert Pracetak Dim. 220-160
m1 15 Gorong-gorong precast dia 1,4 m
m1
m1 J PIPA GALVANIS
m1 1 Pipa Galvanis Dia 3"
btg 2 Pipa Galvanis Dia 2,0"
btg 3 Pipa Galvanis Dia 2,5"
btg 4 Pipa Galvanis Dia 4,0"
btg
btg K PIPA PVC VEGA
btg 1 Pipa PVC dia 1/2"
btg 2 Pipa PVC dia 3/4"
btg 3 Pipa PVC dia 1"
btg 4 Pipa PVC dia 1 1/4"
btg 5 Pipa PVC dia 1 1/2"
btg 6 Pipa PVC dia 2"
btg 7 Pipa PVC dia 2 1/2"
btg 8 Pipa PVC dia 3"
btg 9 Pipa PVC dia 4"
btg 10 Pipa PVC dia 5"
btg 11 Pipa PVC dia 6"
btg
btg L MCK
btg 1 Bidet Toto Type BW 5J W&PIV
btg 2 Colset Jongkok Merk Toto Tipe Standar
btg 3 Ember
btg 4 Bak mandi lokal fiber
btg
btg M PERTAMANAN
btg M1 Rumput (Lawn)
btg 1 Rumput embun (Polytrias sp) lempeng
btg 2 Rumput Gajah (Axonopus sp)
- Tandur
- Lempeng,jarak Lempeng + 2 cm
m3 3 Rumput Golf (Tifton grass) tandur
m3 4 Rumput Manila (Zoysia Matrela), jarak lempeng 2 Cm
m3 5 Rumput Manila (Zoysia Matrela), tandur
m3
m3 M2 Perdu
m3 1 Agave putih (Ageve sp) tinggi 40 cm
m3 2 Agave biasa (Ageve sp) tinggi 50 cm
bh 3 Bugenvil hawai (bougainvillea sp) tinggi 60 cm
4 Mawar putih (rosa hybrida) tinggi 25 cm
5 Mawar Merah (rosa hybrida) tinggi 30 cm
bh 6 Melati costa (jasminum sp) tinggi 50 cm
bh 7 Melati gambir (jasminum sp) tinggi 50 cm
bh 8 Soka Bangkok (Ixora sp) tinggi 20 cm
bh 9 Soka Jepang bunga orange (Ixora sp) tinggi 20 cm
bh 10 Soka philipina (Ixora sp) tinggi 20 cm
bh 11 Soka siantan (Ixora sp) tinggi 20 cm
bh 12 Soka singapuran (Ixora sp) bunga putih, pink, merah, tinggi 20 cm
bh 13 Soka jawa/hawai (Ixora sp) tinggi 30 cm
14 Kol Banda (Pisona Alba)
N READY MIX
bh 1 Ready Mix K 100 slump 12
bh 2 Ready Mix K 100 slump 14
bh 3 Ready Mix K 100 slump 16
bh 4 Ready Mix K 100 slump 18
5 Ready Mix K 125 slump 12
m 6 Ready Mix K 125 slump 14
m 7 Ready Mix K 125 slump 16
m' 8 Ready Mix K 125 slump 18
bh 9 Ready Mix K 175 slump 12
m1 10 Ready Mix K 175 slump 14
m1 11 Ready Mix K 175 slump 16
bh 12 Ready Mix K 175 slump 18
m1 13 Ready Mix K 225 slump 12
bh 14 Ready Mix K 225 slump 14
m' 15 Ready Mix K 225 slump 16
m' 16 Ready Mix K 225 slump 18
17 Ready Mix K 275 slump 12
m 18 Ready Mix K 275 slump 14
unit 19 Ready Mix K 275 slump 16
20 Ready Mix K 275 slump 18
btg 21 Ready Mix K 300 slump 12
btg 22 Ready Mix K 300 slump 14
btg 23 Ready Mix K 300 slump 16
btg 24 Ready Mix K 300 slump 18
btg 25 Ready Mix K 350 slump 12
btg 26 Ready Mix K 350 slump 14
btg 27 Ready Mix K 350 slump 16
btg 28 Ready Mix K 350 slump 18
btg
O PC I GIRDER POSTENSION
1 PCI Girder L = 12,6 m
m 2 PCI Girder L = 13,6 m
m 3 PCI Girder L = 14,6 m
m 4 PCI Girder L = 15,6 m
m 5 PCI Girder L = 16,6 m
m 6 PCI Girder L = 17,6 m
m 7 PCI Girder L = 18,6 m
m 8 PCI Girder L = 19,6 m
m 9 PCI Girder L = 20,6 m
m 10 PCI Girder L = 21,6 m
m 11 PCI Girder L = 22,6 m
m 12 PCI Girder L = 23,6 m
m 13 PCI Girder L = 24,6 m
m 14 PCI Girder L = 25,6 m
m 15 PCI Girder L = 26,6 m
m 16 PCI Girder L = 27,6 m
m 17 PCI Girder L = 28,6 m
m 18 PCI Girder L = 29,6 m
m 19 PCI Girder L = 30,8 m
m 20 PCI Girder L = 31,8 m
m 21 PCI Girder L = 32,8 m
22 PCI Girder L = 33,8 m
23 PCI Girder L = 34,8 m
m 24 PCI Girder L = 35,8 m
m 25 PCI Girder L = 36,8 m
m 26 PCI Girder L = 37,8 m
m 27 PCI Girder L = 38,8 m
m 28 PCI Girder L = 39,8 m
29 PCI Girder L = 40,8 m
m
m P DIAFRAGMA
m 1 Diafragma Pracetak K350 H 0,90
m 2 Diafragma Pracetak K350 H 1,25
m 3 Diafragma Pracetak K350 H 1,60
4 Diafragma Pracetak K350 H 1,70
m 5 Diafragma Pracetak K350 H 2,10
m
m Q ELASTOMER
m 1 Elastomer (300 x 350 x 36)
m 2 Elastomer (350 x 400 x 39)
3 Elastomer (400 x 450 x 45)
m 4 Elastomer (400 x 550 x 80)
m 5 Elastomer (400 x 300 x 40)
m 6 Elastomer (500 x 500 x 60)
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
klg
kg
kg
bh
bh
kg
ltr
kg
kg
kg
ltr
ltr
ltr
kg
lbr
kg
kg
kg
kg
kg
kg
kg
ltr
ltr
lbr
kg
ikat
ltr
ltr
ikat
ltr
ltr
Kg
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m'
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
bh
bh
Unit
Unit
Unit
ps
ps
ps
ps
ps
bh
bh
bh
ps
ps
ps
ps
bh
bh
bh
bh
set
set
set
set
set
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Bh
Bh
bh
bh
lbr
m'
m'
bh
m2
m'
m'
m1
m1
m'
m'
m'
m'
m'
m'
m'
m'
m'
tube
m2
m2
bh
bh
bh
bh
bh
bh
bh
lb
lb
lb
lb
lb
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
btg
kg
kg
kg
kg
kg
kg
m
kg
kg
kg
kg
kg
m2
lbr
bh
bh
bh
bh
kg
kg
kg
kg
ton
ton
ton
Liter
kg
m2
m2
m2
m2
m2
m2
Pcs
Pcs
Pcs
Pcs
Pcs
M2
M
M
m'
m'
Pcs
Pcs
m2
kg
m
m
m
m
unit
unit
m'
m'
panel
panel
rol
kg
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Set
bh
Set
Set
Set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
bh
bh
bh
Set
bh
bh
bh
bh
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
bh
bh
bh
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
Pkt
bh
bh
m
bh
bh
roll
bh
bh
bh
bt
bt
bt
bh
Unit
bh
bh
bh
bh
M2
M2
M2
M2
m
bh
Unit
Unit
btg
bh
bh
bh
bh
bh
bh
bh
bh
bh
Psg
Psg
Kg
bh
Kg
unit
unit
unit
unit
set
unit
unit
unit
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Btg
Btg
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
kg
kg
unit
unit
unit
unit
set
unit
unit
unit
unit
Ltr
Kg
Kg
m2
m3
m2
m2
m2
m2
m2
m2
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Pot
Phn
Btg
Btg
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
dpr
dpr
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
pot
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
phn
kg
kg
kg
kg
kg
kg
kg
kg
kg
pot
pot
phn
phn
pot
rmp
rmp
phn
phn
phn
phn
phn
rmp
phn
bh
krg
krg
krg
bh
bh
m2
bh
bh
bh
bh
bh
bh
bh
kg
krg
krg
kg
kg
kg
kg
kg
btg
m3
m3
hr
lks
m3
m2
phn
phn
phn
phn
phn
phn
phn
phn
m2
m2
m'
m2
m2
m2
m2
m2
m2
m2
bh
bh
btg
btg
btg
m2
m2
m2
m2
Harga
Satuan
Satuan
Rp 135,000 m3
Rp 185,000 m3
Rp 177,000 m3
Rp 195,000 m3
Rp 185,000 m3
Rp 162,000 m3
Rp 185,000 m3
Rp 210,600 m3
Rp 32,500 m3
Rp 220,500 m3
Rp 189,000 m3
Rp 141,600 m3
Rp 165,000 m3
Rp 175,000 m3
Rp 194,000 m3
Rp 425 buah
Rp 325 buah
Rp 1,650 buah
Rp 2,365 buah
Rp 16,170 buah
Rp 54,400 m3
Rp 73,800 m3
Rp 335,500 m2
Rp 200 liter
Rp 2,800 m2
Rp 50,600 zak
Rp 55,000 zak
Rp 53,000 zak
Rp 53,500 zak
Rp 65,000 zak
Rp 881,174 ton
Rp 912,217 ton
Rp 873,185 ton
Rp 904,228 ton
Rp 871,904 ton
Rp 902,948 ton
Rp 5,136,000 m3
Rp 4,788,250 m3
Rp 4,713,350 m3
Rp 3,887,310 m3
Rp 5,561,325 m3
Rp 3,089,625 m3
Rp 3,033,450 m3
Rp 2,921,100 m3
Rp 2,921,100 m3
Rp 5,583,795 m3
Rp 5,617,500 m3
Rp 5,596,030 m3
Rp 15,750 btg
Rp 17,850 btg
Rp 1,200,000 m3
Rp 66,500 lbr
Rp 74,300 lbr
Rp 77,700 lbr
Rp 74,000 lbr
Rp 72,500 lbr
Rp 74,300 lbr
Rp 46,400 lbr
Rp 13,900 lbr
Rp 42,800 lbr
Rp 57,800 lbr
Rp 37,000 lbr
Rp 47,000 lbr
Rp 140,000 lbr
Rp 97,800 lbr
Rp 126,200 lbr
Rp 164,600 lbr
Rp 181,400 lbr
Rp 56,800 lbr
Rp 73,300 lbr
Rp 65,000 lbr
Rp 55,000 lbr
Rp 19,000 bh
Rp 16,000 bh
Rp 384,000 Unit
Rp 900,000 Unit
Rp 152,700 Unit
Rp 65,864 lbr
Rp 57,082 lbr
Rp 60,200 lbr
Rp 50,000 lbr
Rp 50,000 lbr
Rp 36,000 lbr
Rp 65,000 m
Rp 29,000 m
Rp 26,250 m
Rp 22,000 m
Rp 29,000 m
Rp 12,500 lbr
Rp 6,250 lbr
Rp 62,300 lbr
Rp 70,000 lbr
Rp 2,838 kg
Rp 2,903 kg
Rp 3,032 kg
Rp 3,870 kg
Rp 6,450 kg
Rp 9,675 kg
Rp 10,320 kg
Rp 11,610 kg
Rp 30,000 kg
Rp 4,700 kg
Rp 12,000 kg
Rp 10,126 kg
Rp 10,126 kg
Rp 10,604 kg
Rp 10,604 kg
Rp 10,604 kg
Rp 10,604 kg
Rp 10,925 kg
Rp 11,300 kg
Rp 11,700 kg
Rp 11,700 kg
Rp 11,700 btg
Rp 33,409 klg
Rp 54,000 klg
Rp 45,250 klg
Rp 16,675 buah
Rp 13,984 buah
Rp 10,625 buah
Rp 9,250 buah
Rp 8,375 buah
Rp 6,000 liter
Rp 27,500 kg
Rp 12,000 liter
Rp 28,600 kg
Rp 15,000 m'
Rp 3,821,000 buah
Rp 1,210,000 unit
Rp 950,000 unit
Rp 27,650 set
Rp 2,500,000 buah
Rp 1,640,000 unit
Rp 3,000 m2
Rp 880,000 unit
Rp 35,000 unit
Rp 580,000 unit
Rp 850,000 unit
Rp 850,000 unit
Rp 8,000,000 unit
Rp 385,000 m
Rp 16,325,000 set
Rp 3,500,000 unit
Rp 15,000,000 unit
Rp 1,500,000 ls
Rp 6,000 liter
Rp 4,492 m
Rp 1,050,500 buah
Rp 220,000 buah
Rp 818,400 buah
Rp 2,746,000 buah
Rp 5,235,000 unit
Rp 500,000 bulan
Rp 120,000 unit
Rp 896,000 buah
Rp 15,000 buah
Rp 150,000 buah
Rp 70,500 buah
Rp 20,000 buah
Rp 319,000 m'
Rp 386,000 m'
Rp 198,000 m'
Rp 418,000 m'
Rp 240,000 m'
Rp 950,000 m'
Rp 468,000 m'
Rp 719,000 m'
Rp 947,000 m'
Rp 1,549,000 m'
Rp 2,044,000 m'
Rp 4,115,000 m'
Rp 5,923,000 m'
Rp 6,049,000 m'
Rp 1,200,000 m'
Rp 88,300 m'
Rp 56,600 m'
Rp 72,500 m'
Rp 105,600 m'
Rp 9,180 btg
Rp 12,150 btg
Rp 15 btg
Rp 840 btg
Rp 24,750 btg
Rp 29,880 btg
Rp 40,320 btg
Rp 56,250 btg
Rp 78,120 btg
Rp 136,620 btg
Rp 207,000 btg
Rp 274,500 btg
Rp 859,950 buah
Rp 323,700 buah
Rp 30,000 buah
Rp 150,000 buah
Rp 6,100 m2
Rp 7,500 m2
Rp 11,000 m2
Rp 5,000 m2
Rp 11,700 m2
Rp 7,800 m2
Rp 20,000 Pot
Rp 20,000 Pot
Rp 25,000 Pot
Rp 5,600 Pot
Rp 12,770 Pot
Rp 12,800 Pot
Rp 6,800 Pot
Rp 5,800 Pot
Rp 5,800 Pot
Rp 6,500 Pot
Rp 5,600 Pot
Rp 3,200 Pot
Rp 3,200 Pot
Rp 25,000 Pot
Rp 524,200 m3
Rp 544,200 m3
Rp 564,200 m3
Rp 584,200 m3
Rp 557,200 m3
Rp 577,200 m3
Rp 597,200 m3
Rp 617,200 m3
Rp 585,200 m3
Rp 605,200 m3
Rp 625,200 m3
Rp 645,200 m3
Rp 612,200 m3
Rp 632,200 m3
Rp 652,200 m3
Rp 672,200 m3
Rp 659,200 m3
Rp 684,200 m3
Rp 709,200 m3
Rp 734,200 m3
Rp 670,200 m3
Rp 695,200 m3
Rp 720,200 m3
Rp 745,200 m3
Rp 692,200 m3
Rp 717,200 m3
Rp 742,200 m3
Rp 767,200 m3
Rp 60,000,000 batang
Rp 63,000,000 batang
Rp 68,000,000 batang
Rp 71,000,000 batang
Rp 76,000,000 batang
Rp 84,000,000 batang
Rp 87,000,000 batang
Rp 91,000,000 batang
Rp 95,000,000 batang
Rp 100,000,000 batang
Rp 133,000,000 batang
Rp 137,000,000 batang
Rp 142,000,000 batang
Rp 148,000,000 batang
Rp 153,000,000 batang
Rp 159,000,000 batang
Rp 163,000,000 batang
Rp 176,000,000 batang
Rp 221,000,000 batang
Rp 227,000,000 batang
Rp 235,000,000 batang
Rp 243,000,000 batang
Rp 250,000,000 batang
Rp 273,000,000 batang
Rp 284,000,000 batang
Rp 292,000,000 batang
Rp 301,000,000 batang
Rp 311,000,000 batang
Rp 318,000,000 batang
Rp 2,200,000 buah
Rp 3,400,000 buah
Rp 3,500,000 buah
Rp 3,500,000 buah
Rp 4,000,000 buah
Rp 567,000 buah
Rp 819,000 buah
Rp 1,215,000 buah
Rp 2,640,000 buah
Rp 720,000 buah
Rp 2,250,000 buah
ANALISA HARGA SATUAN S.N.I
NO.
A
I
ANALISA 001
ANALISA 002
ANALISA 003
ANALISA 004
ANALISA 005
ANALISA 006
ANALISA 007
ANALISA 008
ANALISA 009
ANALISA 010
ANALISA 011
ANALISA 012
ANALISA 013
ANALISA 014
II
ANALISA 015
ANALISA 016
ANALISA 017
ANALISA 018
ANALISA 019
ANALISA 020
ANALISA 021
ANALISA 022
ANALISA 023
ANALISA 024
ANALISA 025
ANALISA 026
III
ANALISA 027
ANALISA 028
ANALISA 029
IV
ANALISA 030
ANALISA 031
ANALISA 032
ANALISA 033
V
ANALISA 032
ANALISA 033
ANALISA 034
ANALISA 035
ANALISA 036
ANALISA 037
ANALISA 038
ANALISA 039
ANALISA 040
ANALISA 041
ANALISA 042
7.29
ANALISA 043
ANALISA 044
ANALISA 045
ANALISA 046
ANALISA 047
ANALISA 048
ANALISA 049
ANALISA 050
ANALISA 051
ANALISA 052
ANALISA 053
ANALISA 054
ANALISA 055
ANALISA 056
ANALISA 057
ANALISA 058
ANALISA 059
ANALISA 060
ANALISA 061
ANALISA 062
ANALISA 063
III
V
VII
IX
VII
VI
VI
VI
URAIAN
B
PEKERJAAN PERSIAPAN
1 m' Pagar Sementara dari Kayu tinggi 2 m
Bahan
Dolken Kayu Ø 8 - 10/400 cm
Semen Portland
Pasir Beton
Koral Beton
Kaso 5 / 7 ( albasiah )
Paku Biasa 2" - 5"
Residu
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor
PEKERJAAN TANAH
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m² Pek. Stripping 1 m
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m3 Pemadatan tanah
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
PEKERJAAN PONDASI
1 m' Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulang
Bahan
Pasir Urug Darat
Pasir Beton
Koral Beton
Semen Portland
Besi Beton
Kawat Beton
Kayu Kaso 5 / 7 (borneo)
Paku
Minyak Bekisting
Plamuur Tembok
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
PEKERJAAN DINDING
1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
PEKERJAAN PELESTERAN
1 m2 Plesteran Dinding 1Pc : 3Ps
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pelesteran Ciprat 1 Pc : 2 Ps
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
PEKERJAAN KAYU
1m³ Pasang Kusen Pintu dan Jendela Kayu Jati
Bahan
Kayu Balok Jati
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m² Pasang Pintu Teakwood & Formika, rangka Kayu Kamper ( divernis )
Bahan
Papan Kayu Jati
Paku Biasa ½" - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m³ Membuat Beton 1 Pc : 2 Ps : 3 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pasang Bekisting
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Plywood 9 mm
Dolken Kayu Galam Ø 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m² Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo
Bahan
Balok Kayu Borneo
Paku
Asbes
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok
Bahan
Kloset Duduk / Monoblok
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm
Bahan
Pipa Tanah
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Batu Kerikil
Besi Beton
Pasir Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Batu Kerikil
Besi Beton
Pasir Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Batu Koral
Besi Beton
Pasir Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tukang Gali
Memasang 1 m' Pipa Galvanis Ø ½"
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m² Pasang Lantai Ubin Warna ukuran 20 x 20 cm
Bahan
Ubin Warna 20 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m² Pasang Plint Ubin PC Warna ukuran 10 x 30 cm
Bahan
Plint Ubin PC Warna 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m² Pasang Plint Ubin Teralux Kerang ukuran 10 x 30 cm
Bahan
Plint Ubin Teralux Kerang 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m² Plint Kayu 2 x 10 cm
Bahan
Papan Kayu Jati
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
PEKERJAAN PENGECATAN
1 m² Mengikis / Mengerok Permukaan Cat Tembok Lama
Bahan
Soda Api
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m² Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2½.
Bahan
Pasir Silika
BBM
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Bahan
Plamir
Cat Dasar
Cat Tembok vinilex
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um
Bahan
Meni ( Read Lead ) A
Meni ( Read Lead ) B
Alluminium C
Alluminium B
Pengencer
Perancah Kayu
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um
Bahan
Meni Besi
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um
Bahan
Cat Dasar
Cat Antara
Cat Penutup
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, teb
Bahan
Cat Dasar
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
HARGA SAT HARGA SAT JUMLAH
KOEF SAT JUMLAH upah TOTAL harga
matrial upah matrial
C D E F G=(CXE) H = (C X F ) I=(G+H)
1.250 btg Rp - Rp -
2.500 Kg Rp - Rp -
0.005 m3 Rp - Rp -
0.009 m3 Rp - Rp -
0.072 m3 Rp - Rp -
0.060 Kg Rp - Rp -
0.400 Lt Rp - Rp -
0.012 m3 Rp - 0.00
0.020 Kg Rp - 0.00
0.007 m3 Rp - 0.00
2.000 Oh Rp - -
1.000 Oh Rp - -
2.000 Oh Rp - -
0.300 Oh Rp - -
0.050 Oh Rp - -
2.000 Oh Rp - -
1.000 Oh Rp - -
0.200 Oh Rp - -
0.050 Oh Rp - -
1.500 Oh Rp - -
1.000 Oh Rp - -
0.150 Oh Rp - -
0.050 Oh Rp - -
- Oh #N/A #N/A
0.075 Oh #N/A #N/A
0.750 Oh #N/A #N/A
0.2500 Oh #N/A #N/A
sewa / Hr
I. PEKERJAAN PERSIAPAN
1) 1 M2 PEKERJAAN PEMBERSIHAN LOKASI
Produktivitas : 219.21
0.0007 Hari
0.033 OH
0.022 OH
0.002 OH
0.0045 unit
1 ls
0.007 OH
0.07 OH
0.012 m3
0.02 kg
0.007 m3
0.1 OH
0.1 OH
0.01 OH
0.005 OH
0.286 OH
0.571 OH
0.029 OH
0.014 OH
0.025 lbr
0.02275 m3
8 m'
0.08 kg
0.05 zak
0.1 m3
0.5 kg
0.5 bh
0.83 OH
1.66 OH
0.083 OH
0.0415 OH
5) 1 M2 DIREKSI KEET
0.100 zak
0.200 kg
0.670 lbr
0.100 kg
0.080 m3
0.500 lbr
1.000 m²
0.083 daun
70 bh
0.100 kg
0.056 unit
0.028 bh
0.028 bh
0.028 bh
0.222 bh
0.042 bh
0.042 bh
0.042 unit
0.056 bh
0.139 bln
0.014 unit
0.014 bh
0.167 bh
0.167 bh
0.167 bh
0.167 bh
0.0625 OH
0.0625 OH
0.250 OH
0.0625 OH
0.031 OH
0.500 OH
6) 1 M2 POS KEAMANAN
0.05 m³
0.125 kg
0.335 lbr
0.75 lbr
0.05 zak
0.1 m³
35 bh
0.025 OH
0.01 OH
0.1 OH
0.9 OH
7) 1 M2 GUDANG PENYIMPANAN MATERIAL
1.7 btg
0.21 m3
0.3 kg
0.21 kg
0.03 m3
0.05 m3
1.5 lbr
0.05 OH
0.2 OH
2 OH
1 OH
8) 1 M2 BEDENG
0.1 zak
0.2 m3
0.67 lbr
100 buah
0.1 bh
0.25 kg
0.05 m³
0.5 lbr
0.06 bh
0.06 bh
0.0625 OH
0.0625 OH
0.250 OH
0.500 OH
9) 1 M2 BENGKEL KERJA
1.25 btg
0.186 m3
0.3 kg
0.36 zak
0.03 m3
0.05 m3
1 lbr
0.05 OH
0.12 OH
1.2 OH
1 OH
4,400 buah
4,400 buah
4,400 buah
10 Ls
10 Ls
1 unit
1 orang
1 unit
1 unit
3 btg
1 unit
1 set
1.80 OH
0.20 OH
0.02 OH
0.05 OH
1 unit
10 bulan
30 m
1 OH
1 unit
0.2 unit
0.2 OH
1 unit
10 bulan
1 OH
2 OH
16) 1 UNIT PENYEDIAAN P3K
1 unit
16) 1 M2 MUSHOLA
0.382 lbr
0.006 m3
0.67 lbr
0.1 unit
0.05 kg
0.83 OH
1.66 OH
0.083 OH
0.083 OH
8 buah
4 buah
3 buah
2 buah
4 buah
1 buah
1 buah
2 buah
2 buah
2 buah
1 buah
1 buah
ANALISA HARGA SATUAN PEKE
PROYEK JALAN TOL JORR
RUAS JAGAKARSA - PASAR MINGGU Sta. (0+00
PT. RPA CONSTRUCTION
EMBERSIHAN LOKASI
m2/jam
Alat : Harga
BULLDOZER D3B CATERPILLAR 10,500,000
Upah :
Operator 85,000
Pembantu Operator 65,000
Mandor 85,000
Alat : Harga
Sewa Theodolite 15,000,000
Sewa Alat Ukur 1,500,000
Upah :
Surveyor 75,000
Asisten Surveyor 65,000
Bahan :
Kaso kayu kamper samarinda oven uk. 5 x 7 x 400 cm 3,089,625
Paku uk 5 cm 3,870
Papan kayu kamper samarinda oven uk. 3 x 20 x 400 cm 5,617,500
Upah :
Tukang kayu 65,000
Pekerja 55,000
Kepala tukang kayu 75,000
Mandor 85,000
EMAGARAN BASECAMP
Bahan : Harga
Plat seng tebal 0.025 cm lebar 0.9 26,250
Kaso kayu kamper samarinda oven uk. 5 x 7 x 400 cm 3,089,625
Paku Seng 177,000
Upah :
Tukang Kayu 65,000
Perkerja 55,000
Kepala Tukang 75,000
Mandor 85,000
A PROYEK
Bahan : Harga
Seng Plat BJLS 32 L = 0,90 M 70,000
Kaso kayu kamper samarinda oven uk. 5 x 7 x 400 cm 3,089,625
Pipa Galvanis Dia 2,0" 56,600
Paku Seng 4,700
Semen Holcim 50 kg 53,500
Pasir pasang 185,000
Cat kayu/besi KUDA TERBANG 45,250
Kuas no. 3 13,984
Upah:
Tukang kayu 65,000
Pekerja 55,000
Kepala tukang kayu 75,000
Mandor 85,000
Bahan: Harga
Semen Holcim 50 kg 53,500
Pasir pasang 185,000
Plat Asbes 100 x 100 tebal 6 mm 14,300
Paku asbes 12,300
Balok kayu kamper samarinda oven uk. 6 x 12 x 400 cm 3,887,310
Triplek ukr. 122 x 244 x 4 mm 47,000
Ubin Keramik Ukr. 20x20 Standar KW 2 32,200
Kaca nako lengkap tralis 157,755
Bata merah 350
Paku uk. 3 cm 18,000
Kusen dan Daun Pintu PVC ukuran standar 152,700
Bidet Toto Type BW 5J W&PIV 859,950
Bak mandi lokal fiber 150,000
Meja Rapat Daiko 1,050,500
Kursi Lipat Chitose Tipe Yasuka SL 220,000
Meja Kerja uk. 1.5 x 0.8 m 818,400
Filling Cabinet Elite B4-4 08 DX 2,746,000
HP Presario CQ3622L 5,235,000
AC split LG Plasma 1 pk 3,821,000
Sewa Mesin Fotocopy Canon IC MF 4350d 500,000
Fax Panasonic KXTS 505 120,000
Whiteboard Daiko Double Face 90 x 120 cm 896,000
Helm Proyek 15,000
Jas Hujan 150,000
Sepatu Proyek 70,500
Payung 20,000
Upah:
Mandor 85,000
Kepala tukang kayu 75,000
Tukang kayu 65,000
Instalator 75,000
Pembantu Instalator 65,000
Pekerja 55,000
Bahan: Harga
Kaso kayu Meranti Jambi/Palembang ukr. 4 x 6 , 5 x 7 x 400 2,283,300
Paku uk. 3 cm 18,000
Plat Asbes 100 x 100 tebal 5 mm 12,300
Triplek ukr. 122 x 244 x 3 mm 37,000
Semen Holcim 50 kg 54,000
Pasir pasang 185,000
Bata merah 350
Upah:
Mandor 85,000
Kepala tukang kayu 75,000
Tukang kayu setengah terampil 50,000
Pekerja 55,000
HSP POS KEAMANAN =
YIMPANAN MATERIAL
Bahan: Harga
Dolken Ø 5 - 7 cm ukr. 300 - 400 cm 15,500
Triplek ukr. 122 x 244 x 3 mm 37,000
Paku uk. 3 cm 18,000
Semen Holcim 50 kg 54,000
Pasir Beton 177,000
Batu Pecah/Split ukr. 2 - 3 cm 174,300
Plat Asbes 100 x 100 tebal 5 mm 12,300
Upah:
Mandor 85,000
Kepala tukang kayu 75,000
Tukang kayu 65,000
Pekerja 55,000
HSP GUDANG =
Bahan: Harga
Semen Holcim 50 kg 54,000
Pasir pasang 185,000
Plat Asbes 100 x 100 tebal 5 mm 12,300
Bata merah 350
Paku asbes 12,300
Paku uk. 3 cm 18,000
Balok Kayu Meranti Jambi/palembang ukuran 6/8 x 12/15 x 400 2,453,200
Triplek ukr. 122 x 244 x 3 mm 37,000
Colset Jongkok Merk Toto Tipe Standar 323,700
Ember 30,000
Upah:
Mandor 85,000
Kepala tukang kayu 85,000
Tukang kayu 60,000
Pekerja 45,000
HSP BEDENG =
Bahan : Harga
Dolken Ø 5 - 7 cm ukr. 350 - 400 cm 15,750
Kaso kayu kamper samarinda oven uk. 5 x 7 x 400 cm 3,089,625
Paku uk 7 cm 6,450
Semen Holcim 50 kg 53,500
Pasir Beton 177,000
Split 185,000
Seng gelombang 180 x 90 x 0.025 50,000
Upah :
Mandor 85,000
Kepala tukang kayu 85,000
Tukang kayu 60,000
Pekerja 45,000
SI PROYEK
Alat : Harga
SONY CyberShot DSC-W310 (black) 1,640,000.00
Upah :
Dokumentator
AN AIR BERSIH
Alat : Harga
Pompa Air Jet Pump Panasonic GN - 205HX 1,210,000.00
Sumur 1,500,000.00
Pipa PVC dia 1 1/2" 24,750.00
Tangki Air Fiber 1 m3 bulat 950,000.00
Sambungan + Kran 500,000.00
Upah :
Tukang gali tanah 65,000.00
Tukang Pipa 65,000.00
Kepala Tukang Pipa 60,000.00
Mandor 85,000.00
Alat : Harga
Paket Instalasi Listrik Kabel 20 KWh 10,000,000.00
Iuran per bulan 7,000,000.00
Kabel NYA 1 x 2,5 mm2 4,492.00
Upah :
Instalator 75,000.00
AN TELEPON
Alat : Harga
Wifone LG LSP - 400 299,000.00
Tunner Wireless WTU - 770 1,890,000.00
Upah :
Instalator 75,000.00
HSP TELEPON =
AN PENERANGAN
Alat : Harga
Paket Instalasi Listrik Kabel 10 KWh 5,000,000.00
NYA 1 x 1.25 mm2 + pipa PVC, Kabel tiap titik
saklar / stop kontak
Iuran per bulan 3,500,000.00
Upah :
Instalator 75,000.00
Pembantu Instalator 65,000.00
Bahan : Harga
Triplek ukr. 122 x 244 x 4 mm 47,000.00
Balok kayu kamper samarinda oven uk. 6 x 12 x 400 cm 3,887,310.00
Seng gelombang 180 x 90 x 0.2 36,000.00
Paku Seng 4,700.00
Paku uk 5 cm 3,870.00
Upah :
Tukang kayu 65,000.00
Pekerja 55,000.00
Kepala tukang kayu 75,000.00
Mandor 85,000.00
HSP MUSHOLA =
AN DEMOBILISASI
Harga Jadi
6,842.68
2,769.66
1,411.98
138.48
Rp 11,162.81 /m2
Harga Jadi
68,219.03
1,500,000.00
525.00
4,550.00
37,075.50
77.40
39,322.50
6,500.00
5,500.00
750.00
425.00
Rp 7,562.96 /m'
Harga Jadi
28,875.00
18,537.75
8,850.00
18,571.43
31,428.57
2,142.86
1,214.29
Rp 109,619.89 /m'
Harga Jadi
1,750.00
70,288.97
452,800.00
376.00
2,675.00
18,500.00
22,625.00
6,992.00
53,950.00
91,300.00
6,225.00
3,527.50
Rp 731,009.47 /unit
Harga Jadi
5,350.00
37,000.00
9,581.00
1,230.00
310,984.80
23,500.00
32,200.00
13,093.67
24,500.00
1,800.00
8,483.33
23,887.50
4,166.67
29,180.56
48,888.89
34,100.00
114,416.67
218,125.00
212,277.78
69,444.44
1,666.67
12,444.44
2,500.00
25,000.00
11,750.00
3,333.33
5,312.50 1.25
4,687.50 1.25
16,250.00 5
4,687.50 1.25
2,031.25 0.625
27,500.00 10
19.375
Rp 1,339,373.49 /m2
Harga Jadi
114,165.00
2,250.00
4,120.50
27,750.00
2,700.00
18,500.00
12,250.00
2,125.00
750.00
5,000.00
49,500.00
Rp 239,110.50 /m2
Harga Jadi
26,350.00
7,770.00
5,400.00
11,340.00
5,310.00
8,715.00
18,450.00
4,250.00
15,000.00
130,000.00
55,000.00
Rp 287,585.00 /m2
Harga Jadi
5,400.00
37,000.00
8,241.00
35,000.00
1,230.00
4,500.00
122,660.00
18,500.00
17,983.33
1,666.67
5,312.50
5,312.50
15,000.00
22,500.00
Rp 300,306.00 /m2
Harga Jadi
19,687.50
574,670.25
1,935.00
19,260.00
5,310.00
9,250.00
50,000.00
4,250.00
10,200.00
72,000.00
45,000.00
Rp 811,562.75 /m2
263,987,928
65,996,982
109,994,970
2,500,000
2,500,000
Rp 444,979,880.00 /Ls
Harga Jadi
1,640,000.00
Rp 1,640,000.00 /Ls
Harga Jadi
1,210,000.00
1,500,000.00
74,250.00
950,000.00
500,000.00
117,000.00
13,000.00
1,200.00
4,250.00
Rp 4,369,700.00 /Unit
Harga Jadi
10,000,000.00
70,000,000.00
134,760.00
75,000.00
Rp 80,209,760.00 /Unit
Harga Jadi
299,000.00
378,000.00
15,000.00
Rp 692,000.00 /Unit
Harga Jadi
5,000,000.00
35,000,000.00
75,000.00
130,000.00
Rp 40,205,000.00 /Unit
Harga Jadi
350,000.00
Rp 350,000.00 /Unit
Harga Jadi
17,954.00
23,323.86
24,120.00
470.00
193.50
53,950.00
91,300.00
6,225.00
7,055.00
Rp 224,591.36 /m2
32,000,000
16,000,000
12,000,000
8,000,000
8,000,000
4,000,000
4,000,000
4,000,000
4,000,000
8,000,000
2,000,000
4,000,000
Rp 106,000,000.00 /Ls
29
5497
46
14,665,996.00 m3
1,466.60 per 1000 m3
II. PEKERJAAN TANAH
1) STRIPPING
1.1) 1 M3 STRIPING TOP SOIL
Produktivitas : 277.67 m3/jam
Upah :
0.001 OH Operator 85,000.00 43.73
0.001 OH Pembantu Operator 65,000.00 33.44
Upah :
0.001 OH Operator 85,000.00 71.80
0.001 OH Pembantu Operator 65,000.00 54.90
Upah :
0.005 OH Sopir / Driver 50,000.00 239.08
0.005 OH Pembantu Sopir / Driver 43,000.00 205.61
2) 1 M3 GALIAN TANAH
Produktivitas : 222.14 m3/jam
Upah :
0.001 OH Operator 85,000.00 54.66
0.001 OH Pembantu Operator 65,000.00 41.80
Upah :
0.001 OH Operator 85,000.00 55.91
0.001 OH Pembantu Operator 65,000.00 42.75
Upah :
0.003 OH Operator 85,000.00 253.57
0.003 OH Pembantu Operator 65,000.00 193.90
4) 1 M2 PERATAAN TANAH
Produktivitas : 2,370.06 m2/jam
Upah :
0.0001 OH Operator 85,000.00 5.12
0.0001 OH Pembantu Operator 65,000.00 3.92
5) 1 M3 PEMBUANGAN TANAH
Produktivitas : 169.13 m3/jam
Alat : Harga Harga Jadi
0.0008 Hari EXCAVATOR KOBELCO SK-024 6,650,000.00 5,616.91
Upah :
0.001 OH Operator 85,000.00 71.80
0.001 OH Pembantu Operator 65,000.00 54.90
Upah :
0.002 OH Operator 85,000.00 193.74
0.002 OH Pembantu Operator 65,000.00 148.15
Upah :
0.0004 OH Operator 50,000.00 21.26
0.0004 OH Pembantu Operator 43,000.00 18.28
Bahan :
1 m' Saluran Beton Pracetak Dim 60-70 418,000.00 418,000.00
* pengiriman dengan flat bed truck
* upah sopir
* upah pembantu sopir
Upah :
0.006 OH Mandor 85,000.00 505.95
0.012 OH Pekerja 55,000.00 654.76
2) PEKERJAAN GORONG-GORONG
2.1) 1 M3 PEKERJAAN GALIAN TANAH GORONG-GORONG
Produktivitas : 166.60 m3/jam
Upah :
0.0009 OH Operator 50,000.00 42.87
0.0009 OH Pembantu Operator 43,000.00 36.87
Bahan :
1 m' Gorong-gorong precast dia 1,4 m 1,200,000.00 1,200,000.00
* pengiriman dengan flat bed truck
* upah sopir
* upah pembantu sopir
Upah :
0.014 Mandor 95,000.00 1,357.14
0.029 Pekerja 45,000.00 1,285.71
/m3
/m'
IV. PEKERJAAN KONSTRUKSI JALAN
1) 1 M2 PEMADATAN TANAH SUB GRADE
Produktivitas : 530.24 m2/jam
Alat : Harga
0.0003 Hari TANDEM ROLLER 6-8 T. 4,000,000
Upah :
0.00027 OH Operator 85,000
0.00027 OH Pembantu Operator 65,000
Alat : Harga
0.0013 Hari WHEEL LOADER 1.0-1.6 M3 6,650,000
Upah :
0.001 OH Operator 85,000
0.001 OH Pembantu Operator 65,000
Alat :
0.0034 Hari DUMP TRUCK 26 TON 800,000.00
Upah :
0.003 OH Operator 50,000
0.003 OH Pembantu Operator 43,000
Alat :
0.0001 Hari MOTOR GRADER >100 HP 6,300,000
Upah :
0.0001 OH Operator 85,000
0.0001 OH Pembantu Operator 65,000
Alat :
0.0003 Hari TANDEM ROLLER 6-8 T. 4,000,000
Upah :
0.0003 OH Operator 85,000
0.0003 OH Pembantu Operator 65,000
Bahan :
1.2 m3 Sirtu 162,000
Upah :
0.0003 OH Mandor 85,000
0.001 OH Pekerja 55,000
3) PEKERJAAN PEMBESIAN
3.1) 1 KG DOWEL Ø 38 - 300
Upah :
0.07 OH Pekerja 55,000
0.07 OH Tukang besi terampil 65,000
0.007 OH Kepala tukang besi 75,000
0.004 OH Mandor 85,000
HSP DOWEL =
=
Bahan : Harga
1 m' Pipa PVC dia 3/4" 3,037.5
Upah :
0.002 OH Pekerja 55,000
0.0001 OH Mandor 85,000
HSP PEMASANGAN PVC =
Upah :
0.07 OH Pekerja 55,000
0.07 OH Tukang besi terampil 65,000
0.007 OH Kepala tukang besi 75,000
0.004 OH Mandor 85,000
HSP DOWEL =
=
Bahan : Harga
0.04 m3 Kayu Kelas III 1,200,000
6 btg Dolken Ø 5 - 7 cm ukr. 350 - 400 cm 15,750
0.3 kg Baja siku 10,925
0.05 kg Paku uk 3 cm 3,031.5
0.1 liter Minyak Bekisting 6,000
Upah :
0.52 OH Pekerja 55,000
0.26 OH Tukang kayu 65,000
0.026 OH Kepala tukang kayu 75,000
0.026 OH Mandor 85,000
HSP BEKISTING =
Upah :
1.65 OH Pekerja
0.275 OH Tukang batu
24,200
0.028 OH Kepala tukang batu
0.083 OH Mandor
Alat :
0.002 Hari CONCRETE VIBRATOR 350,000
0.00013 Ls Alat Bantu (3 alat) 15,000
Upah :
0.0048 OH Mandor 85,000
0.010 OH Pekerja 55,000
HSP PENGECORAN LC =
Bahan : Harga
1 m2 Plastik 3,000
Upah :
0.0004 OH Mandor 85,000
0.008 OH Pekerja 55,000
Bahan :
371 kg Semen Holcim 50 kg
977.2 m3 Pasir Beton
588,000
1413.45 m 3
Batu Pecah/Split ukr. 2 - 3 cm
215 liter Air
Upah :
1.65 OH Pekerja
0.275 OH Tukang batu
24,200
0.028 OH Kepala tukang batu
0.083 OH Mandor
Upah :
0.0007 OH Operator 85,000
0.0007 OH Pembantu Operator 65,000
0.0014 OH Pekerja 55,000
0.0007 OH Mandor 85,000
HSP PENGECORAN LC =
7) 1 TON GELAR ASPHALT CONCRETE WEARING CORSE TEBAL 5 CM DENGAN 3 KALI PEMADATAN
Alat : Harga
0.0006 Hari ASPHALT FINISHER 6,300,000
Upah :
0.0006 OH Operator 85,000
0.0006 OH Pembantu Operator 65,000
0.0013 OH Pekerja 55,000
0.0006 OH Mandor 85,000
Alat : Harga
0.0003 Hari TANDEM ROLLER 6-8 T. 4,000,000
Upah :
0.00012 OH Operator 85,000
0.00012 OH Pembantu Operator 65,000
Alat : Harga
0.0004 Hari TIRE ROLLER 8-10 T. 3,850,000
Upah :
0.00014 OH Operator 85,000
0.00014 OH Pembantu Operator 65,000
Bahan : Harga
1 m2 Karung 2,800
Upah :
0.0083 OH Pekerja 55,000
0.000417 OH Mandor 85,000
22.90
17.51
Rp 1,118.10 /m2
Harga Jadi
8,741.37
111.73
85.44
2,689.12
168.07
144.54
506.32
6.83
5.22
1,077.69
22.90
17.51
194,400.00
22.90
29.64
Rp 208,029.28 /m3
Harga Jadi
106,323.00
3,850.00
4,550.00
525.00
297.50
Rp 115,545.50 /10 kg
Rp 11,554.55 /kg
Harga Jadi
3,037.50
110.00
8.50
Rp 3,156.00 /m'
Harga Jadi
106,323.00
3,850.00
4,550.00
525.00
297.50
Rp 115,545.50 /10 kg
Rp 11,554.55 /kg
Harga Jadi
48,000.00
94,500.00
3,277.50
151.58
600.00
28,600.00
16,900.00
1,950.00
2,210.00
Rp 196,189.08 /m2
Harga Jadi
2,000,000
Rp 2,000,000 /Ls
Harga Jadi
550,410
833.33
1.88
404.76
523.81
Rp 552,173.79 /m2
Harga Jadi
3,000
35.42
458.33
Rp 3,493.75 /m2
642,810
Harga Jadi
2,479.05
60.21
46.04
77.91
60.21
Rp 645,395.30 /m2
915,499.20
Harga Jadi
4,058.26
54.75
41.87
70.86
54.75
Harga Jadi
1,197.44
9.90
7.57
Harga Jadi
1,383.02
11.87
9.08
Rp 922,398.57 /ton
Harga Jadi
2,800
458.33
35.42
Rp 3,293.75 /m2
159,417.47
V. PEKERJAAN KONSTRUKSI JEMBATAN
1) 1 Ls PENGUKURAN PONDASI, PEAR HEAD, DLL
1 Ls Pengukuran 50,000,000
HSP PENGUKURAN =
2) PEKERJAAN PONDASI
2.1) 1 M3 GALIAN TANAH
Produktivitas : 5.67 m3/jam
Alat : Harga
0.03 Hari BORE PILE MACHINE 3,500,000
Upah :
0.03 OH Operator 85,000
0.03 OH Pembantu Operator 65,000
2.2) 1 M2 BEKISTING
Bahan : Harga
0.04 m3 Kayu Kelas III 1,200,000
0.30 kg Paku uk 3 cm 3,032
0.10 liter Minyak Bekisting 6,000
Upah :
0.52 OH Pekerja 55,000
0.26 OH Tukang kayu 65,000
0.026 OH Kepala tukang kayu 75,000
0.026 OH Mandor 85,000
HSP BEKISTING =
Bahan :
406 kg Semen Holcim 50 kg
957.60 m3 Pasir Beton
635,000
1385.10 m3 Batu Pecah/Split ukr. 2 - 3 cm
215.00 liter Air
Upah :
1.65 OH Pekerja
0.275 OH Tukang batu
24,200
0.028 OH Kepala tukang batu
0.083 OH Mandor
Alat :
0.041 Hari CONCRETE PUMP 3,500,000
Upah :
0.163 OH Pekerja 55,000
0.041 OH Mandor 85,000
Bahan :
413 kg Semen Holcim 50 kg 646,000
953.4 m3 Pasir Beton
1378.35 m3 Batu Pecah/Split ukr. 2 - 3 cm
215 liter Air
Upah :
1.65 OH Pekerja 24,200
0.275 OH Tukang batu
0.028 OH Kepala tukang batu
0.083 OH Mandor
Alat :
0.002 Hari CONCRETE VIBRATOR 350,000
0.0625 Ls Alat Bantu (3 alat) 15,000
Upah :
0.010 OH Pekerja 55,000
0.002 OH Mandor 85,000
HSP CORAN READY MIX K 300 =
4) 1 M2 BEKISTING PILAR
Bahan : Harga
0.04 m3 Kayu Kelas III 1,200,000
0.4 kg Paku uk 12 cm 10,320
0.2 liter Minyak Bekisting 6,000
0.02 m3 Balok kayu kamper samarinda oven uk. 6 x 12 x 400 cm 3,887,310
0.35 lbr Plywood Sungkat uk 4 x 8 x 4 mm 57,082
2 btg Dolken Ø 8 - 10 cm ukr. 350 - 400 cm 17,850
Upah :
0.66 OH Pekerja 55,000
0.33 OH Tukang kayu 65,000
0.033 OH Kepala tukang kayu 75,000
0.033 OH Mandor 85,000
Bahan :
413 kg Semen Holcim 50 kg 646,000
953.4 m3 Pasir Beton
1378.35 m3 Batu Pecah/Split ukr. 2 - 3 cm
215 liter Air
Upah :
1.65 OH Pekerja 24,200
0.275 OH Tukang batu
0.028 OH Kepala tukang batu
0.083 OH Mandor
Alat :
0.0024 Hari CONCRETE VIBRATOR 350,000
0.0024 Hari CONCRETE PUMP 3,500,000
0.0625 Ls Alat Bantu (3 alat) 15,000
Upah :
0.0095 OH Pekerja 55,000
0.0024 OH Mandor 85,000
HSP CORAN READY MIX K 300 DENGAN CONCRETE PUMP =
Bahan : Harga
0.04 m3 Kayu Kelas III 1,200,000
0.40 kg Paku uk 12 cm 10,320
0.20 liter Minyak Bekisting 6,000
0.02 m3 Balok kayu kamper samarinda oven uk. 6 x 12 x 400 cm 3,887,310
0.35 lbr Plywood Sungkat uk 4 x 8 x 4 mm 57,082
6.00 btg Dolken Ø 8 - 10 cm ukr. 350 - 400 cm 17,850
Upah :
0.66 OH Pekerja 55,000
0.33 OH Tukang kayu 65,000
0.033 OH Kepala tukang kayu 75,000
0.033 OH Mandor 85,000
Alat : Harga
0.17 Hari Crane Kobelco 7055 (Crawler) 1,100,000
Upah :
0.17 OH Operator 85,000
0.17 OH Pembantu Operator 65,000
Bahan :
406 kg Semen Holcim 50 kg 635,000
957.60 m3 Pasir Beton
1385.10 m3 Batu Pecah/Split ukr. 2 - 3 cm
215.00 liter Air
Upah :
1.65 OH Pekerja 24,200
0.275 OH Tukang batu
0.028 OH Kepala tukang batu
0.083 OH Mandor
Alat :
0.0024 Hari CONCRETE VIBRATOR 350,000
0.0024 Hari CONCRETE PUMP 3,500,000
0.0625 Ls Alat Bantu (3 alat) 15,000
Upah :
0.0095 OH Pekerja 55,000
0.0024 OH Mandor 85,000
9) 1 TON GELAR ASPHALT CONCRETE WEARING CORSE TEBAL 5 CM DENGAN 3 KALI PEMADATAN
Alat : Harga
0.0008 Hari ASPHALT FINISHER 6,300,000
Upah :
0.0008 OH Operator 85,000
0.0008 OH Pembantu Operator 65,000
Alat : Harga
0.00035 Hari TANDEM ROLLER 6-8 T. 4,000,000
Upah :
0.00035 OH Operator 85,000
0.00035 OH Pembantu Operator 65,000
Alat : Harga
0.00042 Hari TIRE ROLLER 8-10 T. 3,850,000
Upah :
0.00042 OH Operator 85,000
0.00042 OH Pembantu Operator 65,000
HSP PENGHAMPARAN AC-WC =
Bahan : Harga
1 btg PCI Girder L = 40,8 m 318,000,000
Upah :
0.2 OH Pekerja 55,000
0.01 OH Mandor 85,000
Alat : Harga
0.16 Hari Crane Kobelco 7055 (Crawler) 1,100,000
Upah :
0.16 OH Operator 85,000
0.16 OH Pembantu Operator 65,000
Bahan : Harga
1 buah Diafragma Pracetak K350 H 0,90 2,200,000
Upah :
0.2 OH Pekerja 55,000
0.01 OH Mandor 85,000
Alat : Harga
0.17 Hari Crane Kobelco 7055 (Crawler) 1,100,000
Upah :
0.17 OH Operator 85,000
0.17 OH Pembantu Operator 65,000
Upah :
0.07 OH Pekerja 55,000
0.07 OH Tukang besi terampil 65,000
0.007 OH Kepala tukang besi 75,000
0.004 OH Mandor 85,000
HSP DOWEL =
=
Bahan : Harga
1 buah Elastomer (300 x 350 x 36) 567,000
Upah :
0.2 OH Pekerja 55,000
0.01 OH Mandor 85,000
Produktivitas : 1 buah/jam
Alat :
0.14 Hari Crane Kobelco 7055 (Crawler) 1,100,000
Upah :
0.14 OH Operator 85,000
0.14 OH Pembantu Operator 65,000
HSP ELASTOMER =
Bahan : Harga
0.17 m3 Kaso kayu kamper samarinda oven uk. 4 x 6 x 400 cm 3,033,450
0.4 kg Paku uk 7 cm 6,450
0.347 lbr Multiplek ukr. 122 x 244 x 9 mm 97,800
Upah :
0.52 OH Pekerja 55,000
0.26 OH Tukang kayu 65,000
0.026 OH Kepala tukang kayu 75,000
0.026 OH Mandor 85,000
Rp 50,000,000 /Ls
Harga Jadi
88,183.42
2,141.60
1,637.69
Rp 91,962.71 /m3
Harga Jadi
48,000
909
600
28,600
16,900
1,950
2,210
Rp 99,169.45 /m2
692,160
142,857.14
8,979.59
3,469.39
Rp 847,466.12 /m3
703,710
833.33
937.50
523.81
202.38
706,207.02 /m3
Harga Jadi
48,000
4,128
1,200
58,310
19,979
35,700
36,300
21,450
2,475
2,805
Rp 230,346.18 /m2
703,710
833.33
8,333.33
937.50
523.81
202.38
714,540.36 /m3
Harga Jadi
48,000
4,128
1,200
58,310
19,979
107,100
36,300
21,450
2,475
2,805
Rp 301,746.18 /m2
Harga Jadi
189,329
14,630
11,188
Rp 215,146.30 /unit
692,160
833
8,333
938
523.8095238095
202.380952381
Rp 702,990.36 /m3
915,499
Harga Jadi
5,072.99
68.45
52.34
Harga Jadi
1,400.05
29.75
22.75
Harga Jadi
1,617.08
35.70
27.30
Rp 923,825.61 /ton
Harga Jadi
318,000,000
11000
850
Rp 318,011,850.00 /unit
Harga Jadi
173,639
13,418
10,260
Rp 197,316.50 /unit
Rp 5,919,494.87 /Ls
Harga Jadi
2,200,000
11000
850
Rp 2,211,850.00 /unit
Harga Jadi
189,329
14,630
11,188
Rp 215,146.30 /unit
Rp 35,283,993.12 /Ls
Harga Jadi
106,323.00
1,518.90
3,850.00
4,550.00
525.00
297.50
Rp 117,064.40 /10 kg
Rp 11,706.44 /kg
Harga Jadi
567,000
11,000
850
157,143
12,142.86
9,285.71
Rp 757,421.43 /buah
Harga jadi
515,686.50
2,580.00
33,936.60
28,600.00
16,900.00
1,950.00
2,210.00
Rp 601,863.10 /m2
VI. PEKERJAAN MEDIAN
1) 1 UNIT PEMASANGAN MCB (PRECAST)
Upah :
0.00476 OH Pekerja 55,000 261.90
0.00024 OH Mandor 85,000 20.24
Alat :
0.00238 Hari BARRIER LIFT 6,650,000 15,833.33
Upah :
0.002 OH Operator 85,000 202.38
0.002 OH Pembantu Operator 65,000 154.76
2) 1 M3 PENANAMAN RUMPUT
Upah :
0.007 OH Pekerja 55,000 392.86
0.00036 OH Mandor 85,000 30.36
Upah :
0.01 OH Pekerja 55,000 654.76
0.0006 OH Mandor 85,000 50.60
HSP POHON PEREDU = Rp 25,705 /pot
VII. PEKERJAAN LAIN-LAIN
1) 1 M2 PEMBUATAN MARKA JALAN
Bahan :
1.95 kg Cat Marka / Thermoplastik
1.05 liter Thinner
0.45 kg Glass Bead
Alat :
0.002 Hari ROAD MARKING MACHINE
Upah :
0.002 OH Operator
0.002 OH Pembantu Operator
Bahan :
1 unit Reflektor Merah/Kuning
Upah :
0.024 OH Pekerja
0.002 OH Mandor
3. RAMBU
3.1) 1 UNIT RAMBU STA
Bahan :
1 unit Panel + Tiang Rambu STA
0.00225 m3 Ready Mix K 100 slump 12
Upah :
0.071 OH Pekerja
0.007 OH Mandor
Bahan :
1 unit Panel + Tiang Rambu Larangan
0.00225 m3 Ready Mix K 100 slump 12
Upah :
0.071 OH Pekerja
0.007 OH Mandor
Bahan :
1 unit Panel + Tiang Rambu Peringatan
0.00225 m3 Ready Mix K 100 slump 12
Upah :
0.071 OH Pekerja
0.007 OH Mandor
Bahan :
1 unit Panel Rambu Petunjuk 150 x 200 cm Tiang 7 m
0.0045 m3 Ready Mix K 100 slump 12
Upah :
0.071 OH Pekerja
0.007 OH Mandor
Bahan :
1 set PJU Tenaga Surya 30W LED Tiang Model Kupu-kupu
* 2 Unit Modul Surya 100 Wp
* 1 Unit Electronic Box System
* 2 Set Lampu Jalan 30 Watt - 12 Volt (LED)
* 1 Set Kabel Instalasi Modul NYYHY 2 x 2,5mm + Kabel Battery NYAF 2,5mm
+ Kabel Lampu NYYHY 2 x 1,5mm
* 1 Set Tiang 7 Meter, Penyangga Panel, Tiang Armatur Lampu (Galvanis)
* 1 Set Aksesories (mur, baut, klem accu)
Upah :
0.143 OH Pekerja
0.014 OH Mandor
Bahan :
1 m' Guardrail Beam : Panjang 4320 mm x Lebar 312 mm x Tebal 2.7 mm
* beam 4320 x 312 x 2,7 mm
* tiang penyangga 1800 x 178 x 76 x 4,5 / 6,0 mm
* besi pengikat 350 x 178 x 76 x 4,5 / 6,0 mm
* terminal-end 725 x 2,7 mm
Upah :
0.024 OH Pekerja
0.0012 OH Mandor
6) 1 Ls PEMBERSIHAN KEMBALI
1 ls Pembersihan kembali
1,750,000 4,166.67
85,000 202.38
65,000 154.76
55,000 1,309.52
85,000 202.38
55,000 3,928.57
85,000 607.14
55,000 3,928.57
85,000 607.14
55,000 3,928.57
85,000 607.14
55,000 3,928.57
85,000 607.14
524,200.00 Rp 550,200.00
55,000 1309.52
85,000 101.19
15,000,000 15,000,000
1.2 Pengukuran dan Pemasangan Patok 10,994 m' Rp 7,562.96 Rp 83,147,221.43 0.00084 16 0.001 0.001 0.0003
1.3 Pemagaran Base Camp 220 m' Rp 109,619.89 Rp 24,116,376.43 0.00024 2 ###
1.4 Papan Nama Proyek 2 unit Rp 731,009.47 Rp 1,462,018.94 0.00001 4 0.0003 ###
1.12 Pengadaan Air Bersih 2 unit Rp 4,369,700.00 Rp 8,739,400.00 0.00009 4 ### 0.000
1.13 Pengadaan Listrik Kerja 1 unit Rp 80,209,760.00 Rp 80,209,760.00 0.00081 4 ### 0.001
1.18 Mobilisasi & Demolibisasi 1 Ls Rp 106,000,000.00 Rp 106,000,000.00 0.00107 20 ### ### ### ### ### ###
Total = Rp 2,906,236,383.05
II PEKERJAAN TANAH
2.1 Striping
2.1.1 Striping top soil (15 cm) 16,348 m3 Rp 5,479.29 Rp 89,578,044.74 0.00090 5 ### 0.0006
2.1.2 Pembuangan tanah striping 16,348 m3 Rp 9,057.27 Rp 148,072,490.29 0.00149 8 ### 0.0014
2.2 Galian tanah 145,796 m3 Rp 6,849.11 Rp 998,572,813.84 0.01004 19 0.0042 0.0028 0.0016
2.3 Tanah timbunan 108,990 m3 Rp 7,306.62 Rp 796,347,621.05 0.00801 29 0.0008 0.0014 0.0014 0.0014 0.0012
Total = Rp 2,844,102,542.39
IV PEKERJAAN KONSTRUKSI JALAN
3.1 Pemadatan Tanah Sub Grade 159,417 m2 Rp 1,118.10 Rp 178,244,782.28 0.00179 11 0.0012 0.001
3.3.2 Pengecoran LC 10 cm 15,942 m³ Rp 552,173.79 Rp 8,802,615,080.32 0.08852 19 ### 0.0329 0.0329 0.019 curing time
3.3.3 Pembongkaran Bekisting 1 Ls Rp 2,000,000.00 Rp 2,000,000.00 0.00002 2
3.4 Pemasangan plastik (bond breaker) 159,417 m2 Rp 3,493.75 Rp 556,964,803.19 0.00560 3 ###
3.2.2 Pemasangan gorong-gorong precast diameter = 1,40 m 64 m' Rp 1,234,975.51 Rp 79,038,432.65 0.00079 1 ###
Total = Rp 4,823,234,251.43
V PEKERJAAN KONSTRUKSI JEMBATAN
5.1 Pekerjaan Pengukuran
5.1.1 Pengukuran Pondasi, Pear Head, dsb 1 Ls Rp 50,000,000.00 Rp 50,000,000.00 0.00050 5
5.2 Pekerjaan Pondasi
5.2.1 Galian Tanah 384.76 m³ Rp 91,962.71 Rp 35,383,309.26 0.00036 12
5.2.2 Bekisting 142.50 m2 Rp 99,169.45 Rp 14,131,908.71 0.00014 10
5.2.3 Penulangan diameter 10 & 16 2,538.92 kg Rp 11,706.44 Rp 29,721,723.85 0.00030 6
5.2.4 Pengecoran K 275 64.13 m³ Rp 847,466.12 Rp 54,344,772.95 0.00055 10
5.3 Pekerjaan Pilecap
5.3.1 Bekisting 38.4 m² Rp 99,169.45 Rp 3,808,106.88 0.00004 2
5.3.2 Penulangan diameter 10, 13 & 19 1,028.53 kg Rp 11,706.44 Rp 12,040,452.61 0.00012 2
5.3.3 Pengecoran K 300 32 m³ Rp 706,207.02 Rp 22,598,624.76 0.00023 2
5.4 Pekerjaan Pilar
5.4.1 Bekisting 69.37 m² Rp 230,346.18 Rp 15,978,277.03 0.00016 2
5.4.2 Penulangan diameter 10 341.67 kg Rp 11,706.44 Rp 3,999,749.89 0.00004 2
5.4.3 Pengecoran K 300 13.87 m³ Rp 714,540.36 Rp 9,913,013.56 0.00010 1
5.5 Pekerjaan Pier Head
5.5.1 Bekisting 62.4 m² Rp 230,346.18 Rp 14,373,601.32 0.00014 2
5.5.2 Penulangan diameter 10, 13 & 19 1,528.81 kg Rp 11,706.44 Rp 17,896,904.44 0.00018 2
5.5.3 Pengecoran K 300 72 m³ Rp 714,540.36 Rp 51,446,905.71 0.00052 4
5.6 Pekerjaan Abutment
5.6.1 Bekisting 483.853 m² Rp 601,863.10 Rp 291,213,266.52 0.00293 6
5.6.2 Penulangan diameter 13, 16 & 19 1,407.39 Rp 11,706.44 Rp 16,475,479.66 0.00017 5
5.6.3 Pengecoran K 300 77.265 m³ Rp 714,540.36 Rp 55,208,960.69 0.00056 4
5.7 Elastomer 18 buah Rp 757,421.43 Rp 13,633,585.71 0.00014 2
5.8 Pekerjaan Pelat Injak
5.8.1 Bekisting 0.924 m² Rp 230,346.18 Rp 212,839.87 0.00000 3
5.8.2 Penulangan diameter 10, 16 & 19 18,939.32 kg Rp 11,706.44 Rp 221,712,054.65 0.00223 11
5.8.3 Pengecoran K 300 61.824 m³ Rp 714,540.36 Rp 44,175,743.04 0.00044 4
5.9 Pekerjaan Pelat Beton
5.9.1 Bekisting 3.136 m² Rp 301,746.18 Rp 946,276.00 0.00001 1
5.9.2 Pengecoran K 300 10.752 m³ Rp 706,207.02 Rp 7,593,137.92 0.00008 2
5.9.3 Launching Plat Beton 24 unit Rp 215,146.30 Rp 5,163,511.19 0.00005 5
5.10 Pekerjaan Beton Precast
5.10.1 Pekerjaan Girder
a Pengadaan Girder K-350 15 unit Rp 318,011,850.00 Rp 4,770,177,750.00 0.04797 19
b Pemasangan Girder 1 Ls Rp 5,919,494.87 Rp 5,919,494.87 0.00006 19
5.10.2 Pekerjaan Diafragma
a Pengadaan Diafragma K-350 164 unit Rp 2,211,850.00 Rp 362,743,400.00 0.00365 20
b Pemasangan Diafragma 1 Ls Rp 35,283,993.12 Rp 35,283,993.12 0.00035 20
5.11 Pekerjaan Rigid Pavement
5.11.1 Rigid tebal 25 cm
a Bekisting 3.5 m² Rp 196,189.08 Rp 686,661.76 0.00001 2
b Penulangan diameter 10, 16 & 19 20,522.71 kg Rp 11,706.44 Rp 240,247,877.51 0.00242 12
c Pengecoran K 275 300 m³ Rp 702,990.36 Rp 210,897,107.14 0.00212 6
5.1.2 AC-WC 5 cm 60 m³ Rp 923,825.61 Rp 60,743,787.28 0.00061 1
5.11 Pekerjaan Parapet
5.12.1 Bekisting 384.575 m² Rp 196,189.08 Rp 75,449,413.52 0.00076 6
5.12.2 Penulangan diameter 10 & 13 4,761.11 kg Rp 11,706.44 Rp 55,735,643.46 0.00056 10
5.12.3 Pengecoran K 300 82.5 m³ Rp 714,540.36 Rp 58,949,579.46 0.00059 5
5.13 Pelepasan Bekisting 1 Ls Rp 50,000,000.00 Rp 50,000,000.00 0.00050 6
Total = Rp 6,918,806,914.34
VI PEKERJAAN MEDIAN
6.1 Pemasangan MCB ( pre cast ) 10,994 unit Rp 896,472.62 Rp 9,855,819,973.81 0.09911 14
6.2 Penanaman Rumput 10,994 m2 Rp 6,523.21 Rp 71,716,217.86 0.00072 8
6.3 Pohon Peredu 1,099 buah Rp 25,705.36 Rp 28,261,262.96 0.00028 7
Total = Rp 9,955,797,454.63
VII PEKERJAAN LAIN-LAIN
7.1 Pembuatan Marka Jalan
7.1.1 Marka Badan Jalan 942.34 m2 Rp 83,618.81 Rp 78,797,587.88 0.00079 1
7.1.2 Marka Bahu Dalam 2,198.8 m2 Rp 83,618.81 Rp 183,861,038.38 0.00185 2
0.004
curing time
###
###
0.001
0.0005 0.0007
0.0004 ###
###
######
###
###
###
###
0.0025
0.0005
0.0006 ### curing time
###
0.0003
0.0015 0.0018
###
### curing time
### 0.0003
######
0.0015 0.0009
###
0.0008 ###
0.0003 0.0007
### 0.0006
### 0.0006
###
###
###
0.0003 0.0006
###
###
###
###
0.0184
0.0004
###
0.039 0.131 0.131 0.096 0.034 0.111 0.038 0.011 0.010 0.013 0.008 0.005 0.021 0.021 0.013 0.002 0.005 0.020 0.052 0.039 0.023 0.007
20.8% 34.0% 47.1% 56.7% 60.1% 71.2% 75% 76.1% 77.1% 78.4% 79.2% 79.7% 81.9% 84% 85.2% 85.4% 85.9% 88% 93.1% 97% 99.3% 100%
RENCANA ANGGARAN BIAYA
PROYEK JALAN TOL JORR
RUAS JAGAKARSA - PASAR MINGGU Sta. (0+000) – Sta. (5+496.435)
PT. RPA CONSTRUCTION
HARGA
Rp 1,978,582,119.56
Rp 83,147,221.43
Rp 24,116,376.43
Rp 1,462,018.94
Rp 96,434,891.48
Rp 956,442.00
Rp 5,751,700.00
Rp 5,405,508.00
Rp 24,346,882.50
Rp 444,979,880.00
Rp 1,640,000.00
Rp 8,739,400.00
Rp 80,209,760.00
Rp 3,460,000.00
Rp 40,205,000.00
Rp 350,000.00
Rp 449,182.72
Rp 106,000,000.00
Rp 2,906,236,383.05
Rp 89,578,044.74
Rp 148,072,490.29
Rp 998,572,813.84
Rp 796,347,621.05
Rp 469,185,269.31
Rp 342,346,303.16
Rp 2,844,102,542.39
Rp 4,743,300,931.31
Rp 894,887.47
Rp 79,038,432.65
Rp 4,823,234,251.43
Rp 178,244,782.28
Rp 1,658,175,126.74
Rp 1,693,153,785.16
Rp 8,657,697.00
Rp 264,685,225.35
Rp 432,530,544.27
Rp 2,000,000.00
Rp 8,802,615,080.32
Rp 556,964,803.19
Rp 37,039,423,904.02
Rp 17,766,758,542.33
Rp 525,081,308.19
Rp 68,928,290,798.86
Rp 50,000,000.00
Rp 35,383,309.26
Rp 14,131,908.71
Rp 29,721,723.85
Rp 54,344,772.95
Rp 3,808,106.88
Rp 12,040,452.61
Rp 22,598,624.76
Rp 15,978,277.03
Rp 3,999,749.89
Rp 9,913,013.56
Rp 14,373,601.32
Rp 17,896,904.44
Rp 51,446,905.71
Rp 291,213,266.52
Rp 16,475,479.66
Rp 55,208,960.69
Rp 13,633,585.71
Rp 212,839.87
Rp 221,712,054.65
Rp 44,175,743.04
Rp 946,276.00
Rp 7,593,137.92
Rp 5,163,511.19
Rp 4,770,177,750.00
Rp 5,919,494.87
Rp 362,743,400.00
Rp 35,283,993.12
Rp 686,661.76
Rp 240,247,877.51
Rp 210,897,107.14
Rp 60,743,787.28
Rp 75,449,413.52
Rp 55,735,643.46
Rp 58,949,579.46
Rp 50,000,000.00
Rp 6,918,806,914.34
Rp 9,855,819,973.81
Rp 71,716,217.86
Rp 28,261,262.96
Rp 9,955,797,454.63
Rp 78,797,587.88
Rp 183,861,038.38
Rp 183,861,038.38
Rp 53,521,584.13
Rp 16,098,381.29
Rp 10,268,581.97
Rp 27,382,885.26
Rp 208,179,259.97
Rp 1,828,435,955.71
Rp 831,456.74
Rp 286,872,924.17
Rp 186,071,442.54
Rp 3,064,182,136.42
Rp 99,440,650,481
Rp 9,944,065,048
Rp 109,384,716,000
RANCANGAN ANGGARAN BIAYA
PROYEK JALAN TOL JORR
RUAS JAGAKARSA - PASAR MINGGU
PT. RPA CONSTRUCTION
Kode
A
B
C
D
E
F
G
H
Durasi
Kegiatan yang Kegiatan yang
Kegiatan (minggu
Mendahului Mengikuti
)
Pekerjaan Persiapan - B 2
Pekerjaan Tanah A C, D 4
Pekerjaan Gorong-gorong B E 1
Pekerjaan Konstruksi Jalan B E 11
Pekerjaan Drainase D F 4
Pekerjaan Konstruksi Jembatan E G 9
Pekerjaan Median F H 2
Pekerjaan Lain-lain G - 2
BARCHART JAD
Proyek Pembangunan Jalan Tol Jakarta Outering Road (JORR
PT. RPA CON
BARCHART JADW
Proyek Pembangunan Jalan Tol Jakarta Outering Road (JORR
PT. RPA CON
PT. RPA CON
BARCHART
Proyek Pembangunan Jalan Tol Jakarta Outering Road (JORR
PT. RPA CON
###
###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### ######
###
###
###
###
###
###
###
###
###
######
###
###
### ###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
######
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
### ###
###
###
### ###
###
###
###
###
###
6.435)
AGUSTUS
30 31 32 33 34
6.435)
AGUSTUS
30 31 32 33 34
6.435)
AGUSTUS
30 31 32 33 34
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###