DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO Jenis Barang Satuan Harga


A. UPAH
1 Mandor Orang 170,000.00
2 Kepala Tukang Orang 175,000.00
3 Tukang Orang 165,000.00
4 Pekerja Orang 150,000.00

B. HARGA BAHAN
1 Air Liter 125.00
T Ampelas Lembar 3,500.00
T Besi Strip Tebal 5 mm Kg 150,000.00
T Balok Kayu Kelas II M3 3,900,000.00
2 Batu Bata Buah 1,000.00
3 Batu Kali/ Batu Belah (Sungai/Gunung) M3 250,000.00
4 Besi beton polos kg 17,000.00
5 Besi Beton Ulir kg 25,000.00
T Besi Baja Profil kg 150,000.00
6 Bubungan Genteng M1 60,000.00
7 Bubungan Seng M1 55,000.00
8 Cat Dasar Tembok/Sealer Setara Vinilex kg 40,000.00
9 Cat Kayu Dasar kg 45,000.00
10 Cat Kayu Mengkilap Kg 60,000.00
11 Cat Menie Besi Kg 40,000.00
12 Cat Tembok Setara Vinilex Kg 50,000.00
13 Dempul Kayu Kg 18,000.00
14 Dolken Kayu Ф8-10/400 Cm Batang 75,000.00
15 Door Holder pasang 135,000.00
16 Engsel Jendela pasang 25,000.00
17 Engsel Pintu Pasang 30,000.00
18 Floor Drain buah 27,000.00
19 Gypsum Board Tebal 9 mm Lembar 125,000.00
20 Jaring Kawat Baja kg 36,000.00
21 Hak Angin Pasang 18,000.00
22 Kaca Bening Uk.2mm M2 75,000.00
23 Kaca Bening Uk.3mm M2 85,000.00
24 Kaca Bening Uk.5 mm M2 120,000.00
25 Kaca Rayband Uk.3 mm M2 130,000.00
26 Kaca Rayband Uk. 5 mm M2 135,000.00
27 Kaso-Kaso (5x7) Cm M3 3,500,000.00
28 Kawat Beton kg 25,000.00
29 Kawat Duri kg 50,000.00
30 Kawat Harmonika M2 60,000.00
31 Kawat Nyamuk/Kasa Logam M2 40,000.00
32 Kawat Nyamuk/ Kasa Plastik M2 30,000.00
33 Kayu Bakau 10 Cm Batang 60,000.00
34 Kayu Klas I (Seumantok/Ulim/dll) M3 5,500,000.00
T Kerawang/Rooster Bh 700,000.00
T Kayu Kaso 5 x 7 cm M3 325,000.00
T Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 70,000.00
35 Kayu Klas II (Kamper/Kruing/dll) M3 4,800,000.00
36 Kayu Klas III (Borneo/dll) M3 3,900,000.00
37 Kayu Klas IV (Sengon/dll) M3 3,750,000.00
38 Keramik Non Pholised 20 x 20 Cm Setara Ikat Bh 3,000.00
39 Keramik Uk. 20 x 25 Cm Bh 3,500.00
40 Keramik Uk. 40 x 40 cm Bh 12,000.00
41 Keramik Uk. 20 x 25 Cm Bh 3,500.00
42 Keramik Uk. 30 x 30 Cm Bh 6,200.00
43 Kertas Amplas Lembar 3,000.00
44 Kloset Duduk Keramik Setara Toto+Tabung Buah 1,500,000.00
45 Kloset Jongkok Keramik Setara Toto Buah 350,000.00
46 Kran Air 3/4" Buah 10,000.00
47 Kuas Cat Buah 15,000.00
48 Kunci Pintu (Standar) Buah 150,000.00
49 Kunci Pintu Biasa Buah 100,000.00
50 Lampu Hemat Energi 11 watt setara hannochs Buah 35,000.00
51 Lampu Hemat Energi 18 watt setara hannochs Buah 40,000.00
52 Lampu Hemat Energi 20 watt setara hannochs Buah 45,000.00
53 Lem Kayu kg 18,000.00
54 List Eternit kayu M1 8,000.00
55 Marmer M2 50,000.00
56 Minyak Cat Liter 25,000.00
57 Minyak Bekisting Liter 5,000.00
58 Multipleks 3 mm Lembar 70,000.00
59 Multipleks 4 mm Lembar 75,000.00
60 Multipleks 6 mm Lembar 125,000.00
61 Multipleks 9 mm Lembar 155,000.00
62 Pacok Jendela dan Ventilasi pasang 7,500.00
63 Paku Asbes Kg 20,000.00
64 Paku Beton 8 Inci Kotak 19,000.00
65 Paku Kait Buah 1,000.00
66 Paku Kayu Kg 18,000.00
67 Paku Triplek Kg 19,000.00
68 Paku Seng Kg 20,000.00
69 Paku Sumbat Buah 1,200.00
70 Paku Sekrup kg 23,000.00
71 Kerikil Kg 200,000.00
72 Pasir Beton M3 250,000.00
73 Pasir Pasang M3 190,000.00
74 Pasir Urug M3 150,000.00
75 Pelumas/oil Liter 40,000.00
76 Pipa Leading Ф 1" Glavanis Tebal 3,2 mm Batang 75,000.00
77 Pipa Leading Ф 2" Glavanis Tebal 3,2 mm Batang 85,000.00
78 Pipa Leading Ф 3" Glavanis Tebal 3,2 mm Batang 90,000.00
79 Pipa PVC Ф 1" Batang 40,000.00
80 Pipa PVC Ф 2" Batang 50,000.00
81 Pipa PVC Ф 3" Batang 60,000.00
82 Plamir Tembok Kg 30,000.00
83 Plin Keramik Buah 5,000.00
84 Plywood tebal 9mm Lembar 150,000.00
T Plamir Kayu Kg 18,000.00
85 Pemasangan Atap baja Ringan M2 350,000.00
86 Residu Kg 10,000.00
87 Reservoir Air 500 ltr Buah 2,500,000.00
T Profil Aluminium M 80,000.00
T Penjaga Jarak Bekisting / Spacer Bh 30,000.00
T Rabung Seng Genteng M 130,000.00
88 Reservoir Air 1000 ltr Buah 4,000,000.00
89 Reservoir Air 500 ltr stainless Steel Buah 2,000,000.00
90 Schakelar Buah 12,500.00
91 Semen @ 40 kg Zak 55,000.00
92 Semen @ 40 kg Kg 1,375.00
93 Semen Putih @ 50 kg Zak 220,000.00
94 Semen Putih @ 50 kg Kg 4,400.00
95 Semen Warna Kg 7,500.00
96 Seng Genteng Metal M2 75,000.00
97 Seng BJLS 0,20 Cat Pabrik M2 70,000.00
98 Seng Gelobang BJLS 30 M2 50,000.00
99 Seng Gelombang BJLS 30 Cat Pabrik M2 55,000.00
100 Seng Plat BJLS 20 M2 60,000.00
101 Seng Plat BJLS 30 M2 65,000.00
102 Solar (Industri) Liter 12,500.00
103 Sekrup Fixer Buah 500.00
104 Sealant Kg 15,500.00
105 Sumur + Pompa Tangan Terpasang Unit 2,000,000.00
106 Tanah Timbun M3 75,000.00
107 Tiang Pancang M1 300,000.00
108 Teralis Besi M2 380,000.00
109 Titik Lampu + Instalasi Titik 150,000.00
110 Urinoir Keramik Unit 2,500,000.00
111 Vinyl M2 25,000.00
112 WireMesh (Ulir) kg 175,000.00
113 Zakering (Kast Lokal 1 Zekering) Unit 350,000.00
114 Besi Strip Tebal 5 mm Kg 15,000.00
115 Jendela UPVC M2 120,000.00
C. ALAT
1 Stamper Hari-Sewa 50,000.00
2 Dump Truck Jam 200,000.00
3 Molen Jam 100,000.00
Catatan : Bila Bahan Tidak Tercantum Di tabel ini boleh di Tambah
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Beton Mutu F'c= 26,4 Mpa (K 300),Slump (12 ± 2) cm, W/c= 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 150,000.00 247,500.00
2 Tukang OH 0.2750 165,000.00 45,375.00
3 Kepala tukang OH 0.0280 175,000.00 4,900.00
4 Mandor OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 311,885.00
B. BAHAN
1 Semen Portland Kg 413.00 1,375.00 567,875.00
2 Pasir Beton Kg 681.00 250,000.00 170,250,000.00
3 Kerikil Kg 1,021.00 200,000.00
4 Air Liter 215.00 125.00 26,875.00
Jumlah Bahan 170,844,750.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 171,156,635.00
E. Overhead & Profit 10% X D 17,115,663.50
F. Harga Satuan Pekerjaan ( D + E ) 188,272,298.50

Wc Faktor ; Pasir; 1400 Kg, dan kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Batu Kosong ( Aanstamping )
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7800 150,000.00 117,000.00
2 Tukang OH 0.3900 165,000.00 64,350.00
3 Kepala tukang OH 0.0390 175,000.00 6,825.00
4 Mandor OH 0.0390 170,000.00 6,630.00
Jumlah Tenaga Kerja 194,805.00
B. BAHAN
1 Batu Gunung / Batu Kali M3 1.2000 250,000.00 300,000.00
2 Pasir Urug M3 0.4320 150,000.00 64,800.00
Jumlah Bahan 364,800.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 559,605.00
E. Overhead & Profit 10% X D 55,960.50
F. Harga Satuan Pekerjaan ( D + E ) 615,565.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.5000 150,000.00 225,000.00
2 Tukang OH 0.7500 165,000.00 123,750.00
3 Kepala tukang OH 0.0750 175,000.00 13,125.00
4 Mandor OH 0.0750 170,000.00 12,750.00
Jumlah Tenaga Kerja 374,625.00
B. BAHAN
1 Batu Gunung / Batu Kali M3 1.200 250,000.00 300,000.00
2 Semen Portland Kg 163.000 1,375.00 224,125.00
3 Pasir Pasang M3 0.520 190,000.00 98,800.00
Jumlah Bahan 622,925.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 997,550.00
E. Overhead & Profit 10% X D 99,755.00
F. Harga Satuan Pekerjaan ( D + E ) 1,097,305.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Batu Kosong ( Aanstamping )
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7800 150,000.00 117,000.00
2 Tukang OH 0.3900 165,000.00 64,350.00
3 Kepala tukang OH 0.0390 175,000.00 6,825.00
4 Mandor OH 0.0390 170,000.00 6,630.00
Jumlah Tenaga Kerja 194,805.00
B. BAHAN
1 Batu Gunung / Batu Kali M3 1.2000 250,000.00 300,000.00
2 Pasir Urug M3 0.4320 150,000.00 64,800.00
Jumlah Bahan 364,800.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 559,605.00
E. Overhead & Profit 10% X D 55,960.50
F. Harga Satuan Pekerjaan ( D + E ) 615,565.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.5000 150,000.00 225,000.00
2 Tukang OH 0.7500 165,000.00 123,750.00
3 Kepala tukang OH 0.0750 175,000.00 13,125.00
4 Mandor OH 0.0750 170,000.00 12,750.00
Jumlah Tenaga Kerja 374,625.00
B. BAHAN
1 Batu Gunung / Batu Kali M3 1.200 250,000.00 300,000.00
2 Semen Portland Kg 163.000 1,375.00 224,125.00
3 Pasir Pasang M3 0.520 190,000.00 98,800.00
Jumlah Bahan 622,925.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 997,550.00
E. Overhead & Profit 10% X D 99,755.00
F. Harga Satuan Pekerjaan ( D + E ) 1,097,305.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Batu Kosong ( Aanstamping )
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7800 150,000.00 117,000.00
2 Tukang OH 0.3900 165,000.00 64,350.00
3 Kepala tukang OH 0.0390 175,000.00 6,825.00
4 Mandor OH 0.0390 170,000.00 6,630.00
Jumlah Tenaga Kerja 194,805.00
B. BAHAN
1 Batu Gunung / Batu Kali M3 1.2000 250,000.00 300,000.00
2 Pasir Urug M3 0.4320 150,000.00 64,800.00
Jumlah Bahan 364,800.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 559,605.00
E. Overhead & Profit 10% X D 55,960.50
F. Harga Satuan Pekerjaan ( D + E ) 615,565.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.5000 150,000.00 225,000.00
2 Tukang OH 0.7500 165,000.00 123,750.00
3 Kepala tukang OH 0.0750 175,000.00 13,125.00
4 Mandor OH 0.0750 170,000.00 12,750.00
Jumlah Tenaga Kerja 374,625.00
B. BAHAN
1 Batu Gunung / Batu Kali M3 1.200 250,000.00 300,000.00
2 Semen Portland Kg 163.000 1,375.00 224,125.00
3 Pasir Pasang M3 0.520 190,000.00 98,800.00
Jumlah Bahan 622,925.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 997,550.00
E. Overhead & Profit 10% X D 99,755.00
F. Harga Satuan Pekerjaan ( D + E ) 1,097,305.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Batu Kosong ( Aanstamping )
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7800 150,000.00 117,000.00
2 Tukang OH 0.3900 165,000.00 64,350.00
3 Kepala tukang OH 0.0390 175,000.00 6,825.00
4 Mandor OH 0.0390 170,000.00 6,630.00
Jumlah Tenaga Kerja 194,805.00
B. BAHAN
1 Batu Gunung / Batu Kali M3 1.2000 250,000.00 300,000.00
2 Pasir Urug M3 0.4320 150,000.00 64,800.00
Jumlah Bahan 364,800.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 559,605.00
E. Overhead & Profit 10% X D 55,960.50
F. Harga Satuan Pekerjaan ( D + E ) 615,565.50
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pembersihan Lapangan


Satuan / Unit : M2
Analisa : AHSP PU A.2.2.1.9
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.1000 150,000.00 15,000.00
2 Mandor OH 0.0500 170,000.00 8,500.00
Jumlah Tenaga Kerja 23,500.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 23,500.00
E Overhead & Profit 10% X D 2,350.00
F Harga Satuan Pekerjaan ( D + E ) 25,850.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengukuran Dan Pemasangan Bowplank
Satuan / Unit : M'
Analisa : AHSP PU A.2.2.1.4
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.1000 150,000.00 15,000
2 Tukang OH 0.1000 165,000.00 16,500
3 Kepala Tukang OH 0.0100 175,000.00 1,750
4 Mandor OH 0.0050 170,000.00 850
Jumlah Tenaga Kerja 34,100
B. BAHAN
1 Kayu Kelas III M³ 0.0120 3,900,000.00 46,800
2 Paku Kayu Kg 0.0200 18,000.00 360
3 Papan Kayu Kelas IV M³ 0.0070 3,750,000.00 26,250
Jumlah Bahan 73,410
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 107,510
E Overhead & Profit 10% X D 10,751
F Harga Satuan Pekerjaan ( D + E ) 118,261
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1-2 Meter
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.8a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.5260 150,000.00 78,900.00
2 Mandor OH 0.0526 170,000.00 8,942.00
Jumlah Tenaga Kerja 87,842.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 87,842.0
E. Overhead & Profit 10% X D 8,784.20
F. Harga Satuan Pekerjaan ( D + E ) 96,626.20

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Galian Tanah Biasa Sedalam 2-3 Meter
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.8b
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.7350 150,000.00 110,250.00
2 Mandor OH 0.0735 170,000.00 12,495.00
Jumlah Tenaga Kerja 122,745.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 122,745.00
E. Overhead & Profit 10% X D 12,274.50
F. Harga Satuan Pekerjaan ( D + E ) 135,019.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 Meter
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.8
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.7500 150,000.00 112,500.00
2 Mandor OH 0.0250 170,000.00 4,250.00
Jumlah Tenaga Kerja 116,750.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 116,750.00
E. Overhead & Profit 10% X D 11,675.00
F. Harga Satuan Pekerjaan ( D + E ) 128,425.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Mengurug Kembali Galian
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.2500 150,000.00 37,500.00
2 Mandor OH 0.0833 170,000.00 14,161.00
Jumlah Tenaga Kerja 51,661.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 51,661.00
E. Overhead & Profit 10% X D 5,166.10
F. Harga Satuan Pekerjaan ( D + E ) 56,827.10
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memadatkan Tanah ( per 20ncm )
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.10
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.5000 150,000.00 75,000.00
2 Mandor OH 0.0500 170,000.00 8,500.00
Jumlah Tenaga Kerja 83,500.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 167,000.00
E. Overhead & Profit 10% X D 16,700.00
F. Harga Satuan Pekerjaan ( D + E ) 183,700.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Timbunan Tanah didatangkan termasuk perataan dan pemadatan
Satuan / Unit : M3
Analisa : AHSP PU - T.14 E
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.5000 150,000.00 75,000.00
2 Mandor OH 0.0500 170,000.00 8,500.00
Jumlah Tenaga Kerja 83,500.00
B. BAHAN
1 Tanah Timbun M3 1.200 75,000.00 90,000.00
Jumlah Bahan 90,000.00
C. PERALATAN
1 Pemadat Timbuanan (Stamper) Sewa-Hari 0.05 -
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 263,500.00
E. Overhead & Profit 10% X D 26,350.00
F. Harga Satuan Pekerjaan ( D + E ) 289,850.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Urugan Pasir
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.3000 150,000.00 45,000.00
2 Mandor OH 0.0100 170,000.00 1,700.00
Jumlah Tenaga Kerja 46,700.00
B. BAHAN
1 Pasir Urug M3 1.200 150,000.00 180,000.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 226,700.00
E. Overhead & Profit 10% X D 22,670.00
F. Harga Satuan Pekerjaan ( D + E ) 249,370.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Timbunan Tanah
Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11.a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja Galian Tanah OH 0.3000 150,000.00 45,000.00
2 Mandor OH 0.0100 170,000.00 1,700.00
Jumlah Tenaga Kerja 46,700.00
B. BAHAN
1 Tanah Timbun M3 1.200 75,000.00 90,000.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 136,700.00
E. Overhead & Profit 10% X D 13,670.00
F. Harga Satuan Pekerjaan ( D + E ) 150,370.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.5000 150,000.00 225,000.00
2 Tukang OH 0.7500 165,000.00 123,750.00
3 Kepala tukang OH 0.0750 175,000.00 13,125.00
4 Mandor OH 0.0750 170,000.00 12,750.00
Jumlah Tenaga Kerja 374,625.00
B. BAHAN
1 Batu Gunung / Batu Kali M3 1.200 250,000.00 300,000.00
2 Semen Portland Kg 163.000 1,375.00 224,125.00
3 Pasir Pasang M3 0.520 190,000.00 98,800.00
Jumlah Bahan 622,925.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 997,550.00
E. Overhead & Profit 10% X D 99,755.00
F. Harga Satuan Pekerjaan ( D + E ) 1,097,305.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Batu Kosong ( Aanstamping )
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7800 150,000.00 117,000.00
2 Tukang OH 0.3900 165,000.00 64,350.00
3 Kepala tukang OH 0.0390 175,000.00 6,825.00
4 Mandor OH 0.0390 170,000.00 6,630.00
Jumlah Tenaga Kerja 194,805.00
B. BAHAN
1 Batu Gunung / Batu Kali M3 1.2000 250,000.00 300,000.00
2 Pasir Urug M3 0.4320 150,000.00 64,800.00
Jumlah Bahan 364,800.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 559,605.00
E. Overhead & Profit 10% X D 55,960.50
F. Harga Satuan Pekerjaan ( D + E ) 615,565.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Membuat Beton Mutu F'c = 7,4 Mpa (K 100),
Slump (12 ± 2) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 150,000.00 247,500.00
2 Tukang OH 0.2750 165,000.00 45,375.00
3 Kepala tukang OH 0.0280 175,000.00 4,900.00
4 Mandor OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 311,885.00
B. BAHAN
1 Semen Portland Kg 247.00 1,325.00 327,275.00
2 Pasir Beton Kg 869.00 127.14 110,484.66
3 Kerikil Kg 999.00 131.85 131,718.15
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 595,277.81
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 907,162.81
E. Overhead & Profit 10% X D 90,716.28
F. Harga Satuan Pekerjaan ( D + E ) 997,879.09
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 9,8 Mpa (K 125),
Slump (12 ± 2) cm, W/c = 0,78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 150,000.00 247,500.00
2 Tukang OH 0.2750 165,000.00 45,375.00
3 Kepala tukang OH 0.0280 175,000.00 4,900.00
4 Mandor OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 311,885.00
B. BAHAN
1 Semen Portland Kg 247.00 1,325.00 327,275.00
2 Pasir Beton Kg 869.00 127.14 110,484.66
3 Kerikil Kg 999.00 131.85 131,718.15
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 595,277.81
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 907,162.81
E. Overhead & Profit 10% X D 90,716.28
F. Harga Satuan Pekerjaan ( D + E ) 997,879.09
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Membuat Beton Mutu F'c = 14,5 Mpa (K 175),
Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 150,000.00 247,500.00
2 Tukang OH 0.2750 165,000.00 45,375.00
3 Kepala tukang OH 0.0280 175,000.00 4,900.00
4 Mandor OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 311,885.00
B. BAHAN
1 Semen Portland Kg 326.00 1,375.00 448,250.00
2 Pasir Beton Kg 760.00 250,000.00 190,000,000.00
3 Kerikil Kg 1,029.00 200,000.00 205,800,000.00
4 Air Liter 215.00 125.00 26,875.00
Jumlah Bahan 396,275,125.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 396,587,010.00
E. Overhead & Profit 10% X D 39,658,701.00
F. Harga Satuan Pekerjaan ( D + E ) 436,245,711.00
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 16,9 Mpa (K 200),
Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 150,000.00 247,500.00
2 Tukang OH 0.2750 165,000.00 45,375.00
3 Kepala tukang OH 0.0280 175,000.00 4,900.00
4 Mandor OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 311,885.00
B. BAHAN
1 Semen Portland Kg 326.00 1,375.00 448,250.00
2 Pasir Beton Kg 760.00 250,000.00 190,000,000.00
3 Kerikil Kg 1,029.00 200,000.00 205,800,000.00
4 Air Liter 215.00 125.00 26,875.00
Jumlah Bahan 396,275,125.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 396,587,010.00
E. Overhead & Profit 10% X D 39,658,701.00
F. Harga Satuan Pekerjaan ( D + E ) 436,245,711.00
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Membuat Beton Mutu F'c = 19,3 Mpa (K 225),
Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 150,000.00 247,500.00
2 Tukang OH 0.2750 165,000.00 45,375.00
3 Kepala tukang OH 0.0280 175,000.00 4,900.00
4 Mandor OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 311,885.00
B. BAHAN
1 Semen Portland Kg 371.00 1,375.00 510,125.00
2 Pasir Beton Kg 698.00 250,000.00 174,500,000.00
3 Kerikil Kg 1,047.00 200,000.00 209,400,000.00
4 Air Liter 215.00 125.00 26,875.00
Jumlah Bahan 384,437,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 384,748,885.00
E. Overhead & Profit 10% X D 38,474,888.50
F. Harga Satuan Pekerjaan ( D + E ) 423,223,773.50
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 19,3 Mpa (K 250),
Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 150,000.00 247,500.00
2 Tukang OH 0.2750 165,000.00 45,375.00
3 Kepala tukang OH 0.0280 175,000.00 4,900.00
4 Mandor OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 311,885.00
B. BAHAN
1 Semen Portland Kg 384.00 1,325.00 508,800.00
2 Pasir Beton Kg 692.00 127.14 87,980.88
3 Kerikil Kg 1,039.00 131.85 136,992.15
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 759,573.03
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,071,458.03
E. Overhead & Profit 10% X D 107,145.80
F. Harga Satuan Pekerjaan ( D + E ) 1,178,603.83
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Membuat Beton Mutu F'c = 24,0 Mpa (K 275),
Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 150,000.00 247,500.00
2 Tukang OH 0.2750 165,000.00 45,375.00
3 Kepala tukang OH 0.0280 175,000.00 4,900.00
4 Mandor OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 311,885.00
B. BAHAN
1 Semen Portland Kg 406.00 1,375.00 558,250.00
2 Pasir Beton Kg 684.00 250,000.00 171,000,000.00
3 Kerikil Kg 1,026.00 200,000.00 205,200,000.00
4 Air Liter 215.00 125.00 26,875.00
Jumlah Bahan 376,785,125.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 377,097,010.00
E. Overhead & Profit 10% X D 37,709,701.00
F. Harga Satuan Pekerjaan ( D + E ) 414,806,711.00
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Beton Mutu F'c = 26,4 Mpa (K 300),
Slump (12 ± 2) cm, W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 150,000.00 247,500.00
2 Tukang OH 0.2750 165,000.00 45,375.00
3 Kepala tukang OH 0.0280 175,000.00 4,900.00
4 Mandor OH 0.0830 170,000.00 14,110.00
Jumlah Tenaga Kerja 311,885.00
B. BAHAN
1 Semen Portland Kg 413.00 1,375.00 567,875.00
2 Pasir Beton Kg 681.00 250,000.00 170,250,000.00
3 Kerikil Kg 1,021.00 200,000.00 204,200,000.00
4 Air Liter 215.00 125.00 26,875.00
Jumlah Bahan 375,044,750.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 375,356,635.00
E. Overhead & Profit 10% X D 37,535,663.50
F. Harga Satuan Pekerjaan ( D + E ) 412,892,298.50
Wc Faktor ; Pasir ; 1.400 Kg, dan Kerikil = 1.350 Kg
1400 1350
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0700 150,000.00 10,500.00
2 Tukang OH 0.0700 165,000.00 11,550.00
3 Kepala tukang OH 0.0070 175,000.00 1,225.00
4 Mandor OH 0.0400 170,000.00 6,800.00
Jumlah Tenaga Kerja 30,075.00
B. BAHAN
1 Besi Beton Polos Kg 10.500 17,000.00 178,500.00
2 Kawat Beton Kg 0.150 25,000.00 3,750.00
Jumlah Bahan 182,250.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 212,325.00
E. Per Kg Pembesian = D/10 21,232.50
F. Overhead & Profit 10% X E 2,123.25
G. Harga Satuan Pekerjaan ( E + F ) 23,355.75

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Ulir
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17.a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0700 150,000.00 10,500.00
2 Tukang OH 0.0700 165,000.00 11,550.00
3 Kepala tukang OH 0.0070 175,000.00 1,225.00
4 Mandor OH 0.0400 170,000.00 6,800.00
Jumlah Tenaga Kerja 30,075.00
B. BAHAN
1 Besi Beton Ulir Kg 10.500 25,000.00 262,500.00
2 Kawat Beton Kg 0.150 25,000.00 3,750.00
Jumlah Bahan 266,250.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 296,325.00
E. Per Kg Pembesian = D/10 29,632.50
F. Overhead & Profit 10% X E 2,963.25
G. Harga Satuan Pekerjaan ( E + F ) 32,595.75
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 Kg Jaring Kawat Baja/Wire Mesh
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.19
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0250 150,000.000 3,750.000
2 Tukang OH 0.0250 165,000.000 4,125.000
3 Kepala tukang OH 0.0020 175,000.000 350.000
4 Mandor OH 0.0010 170,000.000 170.000
Jumlah Tenaga Kerja 8,395.000
B. BAHAN
1 Jaring Kawat Baja Di Las Kg 1.020 36,000.00 36,720.000
2 Kawat Beton Kg 0.050 25,000.00 1,250.000
Jumlah Bahan 37,970.000
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 46,365.000
E. Overhead & Profit 10% X D 4,636.500
F. Harga Satuan Pekerjaan ( D + E ) 51,001.500

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Pondasi
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.20
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.5200 150,000.00 78,000.00
2 Tukang OH 0.2600 165,000.00 42,900.00
3 Kepala tukang OH 0.0260 175,000.00 4,550.00
4 Mandor OH 0.0260 170,000.00 4,420.00
Jumlah Tenaga Kerja 129,870.00
B. BAHAN
1 Kayu Kelas III M³ 0.040 3,900,000.00 156,000.00
2 Paku 5 Cm - 10 Cm Kg 0.300 18,000.00 5,400.00
3 Minyak Bekisting Liter 0.100 5,000.00 500.00
Jumlah Bahan 161,900.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 291,770.00
E. Overhead & Profit 10% X D 29,177.00
F. Harga Satuan Pekerjaan ( D+E ) 320,947.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Bekisting Untuk Sloof
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.5200 150,000.00 78,000.00
2 Tukang OH 0.2600 165,000.00 42,900.00
3 Kepala tukang OH 0.0260 175,000.00 4,550.00
4 Mandor OH 0.0260 170,000.00 4,420.00
Jumlah Tenaga Kerja 129,870.00
B. BAHAN
1 Kayu Kelas III M³ 0.040 3,900,000.00 156,000.00
2 Paku 5 Cm - 10 Cm Kg 0.300 18,000.00 5,400.00
3 Minyak Bekisting Liter 0.100 5,000.00 500.00
Jumlah Bahan 161,900.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 291,770.00
E. Overhead & Profit 10% X D 29,177.00
F. Harga Satuan Pekerjaan ( D+E ) 320,947.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Kolom
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6600 150,000.00 99,000.00
2 Tukang OH 0.3300 165,000.00 54,450.00
3 Kepala tukang OH 0.0330 175,000.00 5,775.00
4 Mandor OH 0.0330 170,000.00 5,610.00
Jumlah Tenaga Kerja 164,835.00
B. BAHAN
1 Kayu Kelas III M³ 0.0400 3,900,000.00 156,000.00
2 Paku 5 Cm - 10 Cm Kg 0.4000 18,000.00 7,200.00
3 Minyak Bekisting Liter 0.2000 5,000.00 1,000.00
4 Balok Kayu Kelas II M³ 0.0150 3,900,000.00 58,500.00
5 Plywood Tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 2.0000 70,000.00 140,000.00
Jumlah Bahan 415,200.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 580,035.00
E. Overhead & Profit 10% X D 58,003.50
F. Harga Satuan Pekerjaan ( D+E ) 638,038.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Bekisting Untuk Balok
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.23
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6600 150,000.00 99,000.00
2 Tukang OH 0.3300 165,000.00 54,450.00
3 Kepala tukang OH 0.0330 175,000.00 5,775.00
4 Mandor OH 0.0330 170,000.00 5,610.00
Jumlah Tenaga Kerja 164,835.00
B. BAHAN
1 Kayu Kelas III M³ 0.0400 3,900,000.00 156,000.00
2 Paku 5 Cm - 10 Cm Kg 0.4000 18,000.00 7,200.00
3 Minyak Bekisting Liter 0.2000 5,000.00 1,000.00
4 Balok Kayu Kelas II M³ 0.0180 3,900,000.00 70,200.00
5 Plywood Tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 2.0000 70,000.00 140,000.00
Jumlah Bahan 426,900.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 591,735.00
E. Overhead & Profit 10% X D 59,173.50
F. Harga Satuan Pekerjaan ( D+E ) 650,908.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Plat Lantai
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.24
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6600 150,000.00 99,000.00
2 Tukang OH 0.3300 165,000.00 54,450.00
3 Kepala tukang OH 0.0330 175,000.00 5,775.00
4 Mandor OH 0.0330 170,000.00 5,610.00
Jumlah Tenaga Kerja 164,835.00
B. BAHAN
1 Kayu Kelas III M³ 0.0400 3,900,000.00 156,000.00
2 Paku 5 Cm - 10 Cm Kg 0.4000 18,000.00 7,200.00
3 Minyak Bekisting Liter 0.2000 5,000.00 1,000.00
4 Balok Kayu Kelas II M³ 0.0150 3,900,000.00 58,500.00
5 Plywood Tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 6.0000 70,000.00 420,000.00
Jumlah Bahan 695,200.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 860,035.00
E. Overhead & Profit 10% X D 86,003.50
F. Harga Satuan Pekerjaan ( D+E ) 946,038.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Bekisting Untuk Dinding
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.25
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6600 150,000.00 99,000.00
2 Tukang OH 0.3300 165,000.00 54,450.00
3 Kepala tukang OH 0.0330 175,000.00 5,775.00
4 Mandor OH 0.0330 170,000.00 5,610.00
Jumlah Tenaga Kerja 164,835.00
B. BAHAN
1 Kayu Kelas III M³ 0.030 3,900,000.00 117,000.00
2 Paku 5 Cm - 10 Cm Kg 0.400 18,000.00 7,200.00
3 Minyak Bekisting Liter 0.200 5,000.00 1,000.00
4 Balok Kayu Kelas II M³ 0.020 3,900,000.00 78,000.00
5 Plywood Tebal 9 mm Lbr 0.350 150,000.00 52,500.00
6 Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 3.000 70,000.00 210,000.00
7 Penjaga Jarak Bekisting / Spacer Bh 4.000 30,000.00 120,000.00
Jumlah Bahan 585,700.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 750,535.00
E. Overhead & Profit 10% X D 75,053.50
F. Harga Satuan Pekerjaan ( D+E ) 825,588.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Bekisting Untuk Tangga
Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.26
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6600 150,000.00 99,000.00
2 Tukang OH 0.3300 165,000.00 54,450.00
3 Kepala tukang OH 0.0330 175,000.00 5,775.00
4 Mandor OH 0.0330 170,000.00 5,610.00
Jumlah Tenaga Kerja 164,835.00
B. BAHAN
1 Kayu Kelas III M³ 0.030 3,900,000.00 117,000.00
2 Paku 5 Cm - 10 Cm Kg 0.400 18,000.00 7,200.00
3 Minyak Bekisting Liter 0.150 5,000.00 750.00
4 Balok Kayu Kelas II M³ 0.015 3,900,000.00 58,500.00
5 Plywood Tebal 9 mm Lbr 0.350 150,000.00 52,500.00
6 Kayu Dolken dia. 8 - 10 Cm, L = 4 M Batang 2.000 70,000.00 140,000.00
Jumlah Bahan 375,950.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 540,785.00
E. Overhead & Profit 10% X D 54,078.50
F. Harga Satuan Pekerjaan ( D+E ) 594,863.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Baja Profil
Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.1
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0600 150,000.00 9,000.00
2 Tukang OH 0.0600 165,000.00 9,900.00
3 Kepala tukang OH 0.0060 175,000.00 1,050.00
4 Mandor OH 0.0030 170,000.00 510.00
Jumlah Tenaga Kerja 20,460.00
B. BAHAN
1 Besi Baja Profil Kg 1.150 150,000.00 172,500.00
Jumlah Bahan 172,500.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 192,960.00
E. Overhead & Profit 10% X D 19,296.00
F. Harga Satuan Pekerjaan ( D+E ) 212,256.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pemasangan rangka Kuda-Kuda Baja Profil IWF
Satuan / Unit : Kg
Analisa : Taksir
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0600 150,000.00 9,000.0000
2 Tukang OH 0.0600 165,000.00 9,900.00
3 Kepala tukang OH 0.0060 175,000.00 1,050.00
4 Mandor OH 0.0030 170,000.00 510.00
Jumlah Tenaga Kerja 20,460.00
B. BAHAN
1 Besi Baja Profil IWF Kg 1.150 150,000.00 172,500.00
Jumlah Bahan 172,500.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 192,960.00
E. Overhead & Profit 10% X D 19,296.00
F. Harga Satuan Pekerjaan ( D + E ) 212,256.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Kusen Pintu Alluminium
Satuan / Unit : M
Analisa : AHSP PU A.4.2.1.11
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0430 150,000.00 6,450.00
2 Tukang OH 0.0430 165,000.00 7,095.00
3 Kepala tukang OH 0.0430 175,000.00 7,525.00
4 Mandor OH 0.0021 170,000.00 357.00
Jumlah Tenaga Kerja 21,427.00
B. BAHAN
1 Profil Aluminium M 1.100 80,000.00 88,000.00
2 Sekrup Fixer Buah 2.000 500.00 1,000.00
3 Sealant Tube 0.060 15,500.00 930.00
Jumlah Bahan 89,930.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 111,357.00
E. Overhead & Profit 10% X D 11,135.70
F. Harga Satuan Pekerjaan ( D + E ) 122,492.70

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6000 150,000.00 90,000.00
2 Tukang OH 0.2000 165,000.00 33,000.00
3 Kepala tukang OH 0.0200 175,000.00 3,500.00
4 Mandor OH 0.0300 170,000.00 5,100.00
Jumlah Tenaga Kerja 131,600.00
B. BAHAN
1 Batu Bata Bh 140.000 1,000.00 140,000.00
2 Semen Portland Kg 43.500 1,375.00 59,812.50
3 Pasir Pasang M3 0.080 190,000.00 15,200.00
Jumlah Bahan 215,012.50
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 346,612.50
E. Overhead & Profit 10% X D 34,661.25
F. Harga Satuan Pekerjaan ( D + E ) 381,273.75
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6000 150,000.00 90,000.00
2 Tukang OH 0.2000 165,000.00 33,000.00
3 Kepala tukang OH 0.0200 175,000.00 3,500.00
4 Mandor OH 0.0300 170,000.00 5,100.00
Jumlah Tenaga Kerja 131,600.00
B. BAHAN
1 Batu Bata Bh 140.000 1,000.00 140,000.00
2 Semen Portland Kg 32.950 1,375.00 45,306.25
3 Pasir Pasang M3 0.091 190,000.00 17,290.00
Jumlah Bahan 202,596.25
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 334,196.25
E. Overhead & Profit 10% X D 33,419.63
F. Harga Satuan Pekerjaan ( D + E ) 367,615.88

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.3
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6000 150,000.00 90,000.00
2 Tukang OH 0.2000 165,000.00 33,000.00
3 Kepala tukang OH 0.0200 175,000.00 3,500.00
4 Mandor OH 0.0300 170,000.00 5,100.00
Jumlah Tenaga Kerja 131,600.00
B. BAHAN
1 Batu Bata Bh 140.000 1,000.00 140,000.00
2 Semen Portland Kg 26.550 1,375.00 36,506.25
3 Pasir Pasang M3 0.093 190,000.00 17,670.00
Jumlah Bahan 194,176.25
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 325,776.25
E. Overhead & Profit 10% X D 32,577.63
F. Harga Satuan Pekerjaan ( D + E ) 358,353.88
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.4
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6000 150,000.00 90,000.00
2 Tukang OH 0.2000 165,000.00 33,000.00
3 Kepala tukang OH 0.0200 175,000.00 3,500.00
4 Mandor OH 0.0300 170,000.00 5,100.00
Jumlah Tenaga Kerja 131,600.00
B. BAHAN
1 Batu Bata Bh 140.000 1,000.00 140,000.00
2 Semen Portland Kg 22.200 1,375.00 30,525.00
3 Pasir Pasang M3 0.102 190,000.00 19,380.00
Jumlah Bahan 189,905.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 321,505.00
E. Overhead & Profit 10% X D 32,150.50
F. Harga Satuan Pekerjaan ( D + E ) 353,655.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 150,000.00 45,000.00
2 Tukang OH 0.1000 165,000.00 16,500.00
3 Kepala tukang OH 0.0100 175,000.00 1,750.00
4 Mandor OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 65,800.00
B. BAHAN
1 Batu Bata Bh 70.000 1,000.00 70,000.00
2 Semen Portland Kg 18.950 1,375.00 26,056.25
3 Pasir Pasang M3 0.038 190,000.00 7,220.00
Jumlah Bahan 103,276.25
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 169,076.25
E. Overhead & Profit 10% X D 16,907.63
F. Harga Satuan Pekerjaan ( D + E ) 185,983.88
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 150,000.00 45,000.00
2 Tukang OH 0.1000 165,000.00 16,500.00
3 Kepala tukang OH 0.0100 175,000.00 1,750.00
4 Mandor OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 65,800.00
B. BAHAN
1 Batu Bata Bh 70.000 1,000.00 70,000.00
2 Semen Portland Kg 14.370 1,375.00 19,758.75
3 Pasir Pasang M3 0.040 190,000.00 7,600.00
Jumlah Bahan 97,358.75
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 163,158.75
E. Overhead & Profit 10% X D 16,315.88
F. Harga Satuan Pekerjaan ( D + E ) 179,474.63

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 150,000.00 45,000.00
2 Tukang OH 0.1000 165,000.00 16,500.00
3 Kepala tukang OH 0.0100 175,000.00 1,750.00
4 Mandor OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 65,800.00
B. BAHAN
1 Batu Bata Bh 70.000 1,000.00 70,000.00
2 Semen Portland Kg 11.500 1,375.00 15,812.50
3 Pasir Pasang M3 0.043 190,000.00 8,170.00
Jumlah Bahan 93,982.50
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 159,782.50
E. Overhead & Profit 10% X D 15,978.25
F. Harga Satuan Pekerjaan ( D + E ) 175,760.75
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 150,000.00 45,000.00
2 Tukang OH 0.1000 165,000.00 16,500.00
3 Kepala tukang OH 0.0100 175,000.00 1,750.00
4 Mandor OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 65,800.00
B. BAHAN
1 Batu Bata Bh 70.000 1,000.00 70,000.00
2 Semen Portland Kg 9.680 1,375.00 13,310.00
3 Pasir Pasang M3 0.045 190,000.00 8,550.00
Jumlah Bahan 91,860.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 157,660.00
E. Overhead & Profit 10% X D 15,766.00
F. Harga Satuan Pekerjaan ( D + E ) 173,426.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1Pc : 3 pp
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.22
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 150,000.00 45,000.00
2 Tukang OH 0.1000 165,000.00 16,500.00
3 Kepala tukang OH 0.0100 175,000.00 1,750.00
4 Mandor OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 65,800.00
B. BAHAN
1 Kerawang/Roster Bh 30.000 700,000.00 21,000,000.00
2 Semen Portland Kg 11.000 1,375.00 15,125.00
3 Pasir Pasang M3 0.035 190,000.00 6,650.00
Jumlah Bahan 21,021,775.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 21,087,575.00
E. Overhead & Profit 10% X D 2,108,757.50
F. Harga Satuan Pekerjaan ( D + E ) 23,196,332.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1Pc : 4 pp
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.23
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 150,000.00 45,000.00
2 Tukang OH 0.1000 165,000.00 16,500.00
3 Kepala tukang OH 0.0100 175,000.00 1,750.00
4 Mandor OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 65,800.00
B. BAHAN
1 Kerawang/Roster Bh 30.000 700,000.00 21,000,000.00
2 Semen Portland Kg 11.000 1,375.00 15,125.00
3 Pasir Pasang M3 0.035 190,000.00 6,650.00
Jumlah Bahan 21,021,775.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 21,087,575.00
E. Overhead & Profit 10% X D 2,108,757.50
F. Harga Satuan Pekerjaan ( D + E ) 23,196,332.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Plasteran 1 Pc : 1 pp Tebal 15 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.1
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 150,000.00 45,000.00
2 Tukang OH 0.1500 165,000.00 24,750.00
3 Kepala tukang OH 0.0150 175,000.00 2,625.00
4 Mandor OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 74,925.00
B. BAHAN
1 Semen Portland Kg 15.504 1,375.00 21,318.00
2 Pasir Pasang M3 0.016 190,000.00 3,040.00
Jumlah Bahan 24,358.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 99,283.00
E. Overhead & Profit 10% X D 9,928.30
F. Harga Satuan Pekerjaan ( D + E ) 109,211.30
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Plasteran 1 Pc : 2 pp Tebal 15 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 150,000.00 45,000.00
2 Tukang OH 0.1500 165,000.00 24,750.00
3 Kepala tukang OH 0.0150 175,000.00 2,625.00
4 Mandor OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 74,925.00
B. BAHAN
1 Semen Portland Kg 10.224 1,375.00 14,058.00
2 Pasir Pasang M3 0.020 190,000.00 3,800.00
Jumlah Bahan 17,858.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 92,783.00
E. Overhead & Profit 10% X D 9,278.30
F. Harga Satuan Pekerjaan ( D + E ) 102,061.30

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Plasteran 1 Pc : 3 pp Tebal 15 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.3
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 150,000.00 45,000.00
2 Tukang OH 0.1500 165,000.00 24,750.00
3 Kepala tukang OH 0.0150 175,000.00 2,625.00
4 Mandor OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 74,925.00
B. BAHAN
1 Semen Portland Kg 6.240 1,375.00 8,580.00
2 Pasir Pasang M3 0.023 190,000.00 4,370.00
Jumlah Bahan 12,950.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 87,875.00
E. Overhead & Profit 10% X D 8,787.50
F. Harga Satuan Pekerjaan ( D + E ) 96,662.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Plasteran 1 Pc :4 pp Tebal 15 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.4
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 150,000.00 45,000.00
2 Tukang OH 0.1500 165,000.00 24,750.00
3 Kepala tukang OH 0.0150 175,000.00 2,625.00
4 Mandor OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 74,925.00
B. BAHAN
1 Semen Portland Kg 6.240 1,375.00 8,580.00
2 Pasir Pasang M3 0.024 190,000.00 4,560.00
Jumlah Bahan 13,140.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 88,065.00
E. Overhead & Profit 10% X D 8,806.50
F. Harga Satuan Pekerjaan ( D + E ) 96,871.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Plasteran 1 Pc : 5 pp Tebal 15 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.3000 150,000.00 45,000.00
2 Tukang OH 0.1500 165,000.00 24,750.00
3 Kepala tukang OH 0.0150 175,000.00 2,625.00
4 Mandor OH 0.0150 170,000.00 2,550.00
Jumlah Tenaga Kerja 74,925.00
B. BAHAN
1 Semen Portland Kg 15.504 1,375.00 21,318.00
2 Pasir Pasang M3 0.016 190,000.00 3,040.00
Jumlah Bahan 24,358.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 99,283.00
E. Overhead & Profit 10% X D 9,928.30
F. Harga Satuan Pekerjaan ( D + E ) 109,211.30
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Acian
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.27
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.2000 150,000.00 30,000.00
2 Tukang OH 0.1000 165,000.00 16,500.00
3 Kepala tukang OH 0.0100 175,000.00 1,750.00
4 Mandor OH 0.0100 170,000.00 1,700.00
Jumlah Tenaga Kerja 49,950.00
B. BAHAN
1 Semen Portland Kg 3.250 1,375.00 4,468.75
Jumlah Bahan 4,468.75
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 54,418.75
E. Overhead & Profit 10% X D 5,441.88
F. Harga Satuan Pekerjaan ( D + E ) 59,860.63

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 40 x 40 Cm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.34.a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7000 150,000.00 105,000.00
2 Tukang OH 0.3500 165,000.00 57,750.00
3 Kepala tukang OH 0.0350 175,000.00 6,125.00
4 Mandor OH 0.0350 170,000.00 5,950.00
Jumlah Tenaga Kerja 174,825.00
B. BAHAN
1 Keramik Lantai Uk. 40 x 40 Cm Bh 6.630 12,000.00 79,560.00
2 Semen Portland Kg 9.800 1,375.00 13,475.00
3 Semen Warna Kg 1.300 7,500.00 9,750.00
4 Pasir Pasang M3 0.045 190,000.00 8,550.00
Jumlah Bahan 111,335.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 286,160.00
E. Overhead & Profit 10% X D 28,616.00
F. Harga Satuan Pekerjaan ( D + E ) 314,776.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Keramik Uk. 30 x 30 Cm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.35
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7000 150,000.00 105,000.00
2 Tukang OH 0.3500 165,000.00 57,750.00
3 Kepala tukang OH 0.0350 175,000.00 6,125.00
4 Mandor OH 0.0350 170,000.00 5,950.00
Jumlah Tenaga Kerja 174,825.00
B. BAHAN
1 Keramik Lantai Uk. 30 x 30 Cm Bh 11.870 6,200.00 73,594.00
2 Semen Portland Kg 10.000 1,375.00 13,750.00
3 Semen Warna Kg 1.500 7,500.00 11,250.00
4 Pasir Pasang M3 0.045 190,000.00 8,550.00
Jumlah Bahan 107,144.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 281,969.00
E. Overhead & Profit 10% X D 28,196.90
F. Harga Satuan Pekerjaan ( D + E ) 310,165.90

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 20 x 20 Cm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.36
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7000 150,000.00 105,000.00
2 Tukang OH 0.3500 165,000.00 57,750.00
3 Kepala tukang OH 0.0350 175,000.00 6,125.00
4 Mandor OH 0.0350 170,000.00 5,950.00
Jumlah Tenaga Kerja 174,825.00
B. BAHAN
1 Keramik Lantai Uk. 20 x 20 Cm Bh 26.500 3,000.00 79,500.00
2 Semen Portland Kg 10.400 1,375.00 14,300.00
3 Semen Warna Kg 1.620 7,500.00 12,150.00
4 Pasir Pasang M3 0.045 190,000.00 8,550.00
Jumlah Bahan 114,500.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 289,325.00
E. Overhead & Profit 10% X D 28,932.50
F. Harga Satuan Pekerjaan ( D + E ) 318,257.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 10 x 10 Cm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.34.a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0900 150,000.00 13,500.00
2 Tukang OH 0.0900 165,000.00 14,850.00
3 Kepala tukang OH 0.0350 175,000.00 6,125.00
4 Mandor OH 0.0050 170,000.00 850.00
Jumlah Tenaga Kerja 35,325.00
B. BAHAN
1 Piint Keramik Uk.10 x 10 Cm Bh 10.600 5,000.00 53,000.00
2 Semen Portland Kg 1.140 1,375.00 1,567.50
3 Semen Warna Kg 0.050 7,500.00 375.00
4 Pasir Pasang M3 0.003 190,000.00 570.00
Jumlah Bahan 55,512.50
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 90,837.50
E. Overhead & Profit 10% X D 9,083.75
F. Harga Satuan Pekerjaan ( D + E ) 99,921.25

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pasangan Dinding Keramik Uk. 20 x 25 Cm
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.54
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.9000 150,000.00 135,000.00
2 Tukang OH 0.4500 165,000.00 74,250.00
3 Kepala tukang OH 0.0450 175,000.00 7,875.00
4 Mandor OH 0.0450 170,000.00 7,650.00
Jumlah Tenaga Kerja 224,775.00
B. BAHAN
1 Keramik Dinding Uk. 20 x 25 Cm Bh 20.000 3,500.00 70,000.00
2 Semen Portland Kg 9.300 1,375.00 12,787.50
3 Semen Warna Kg 1.940 7,500.00 14,550.00
4 Pasir Pasang M3 0.018 190,000.00 3,420.00
Jumlah Bahan 100,757.50
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 325,532.50
E. Overhead & Profit 10% X D 32,553.25
F. Harga Satuan Pekerjaan ( D + E ) 358,085.75
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Langit-Langit Tripleks Ukuran (120x240) cm,
tebal 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.1000 150,000.00 15,000.00
2 Tukang OH 0.1000 165,000.00 16,500.00
3 Kepala tukang OH 0.0100 175,000.00 1,750.00
4 Mandor OH 0.0050 170,000.00 850.00
Jumlah Tenaga Kerja 34,100.00
B. BAHAN
1 Keramik Dinding Uk. 20 x 25 Cm Bh 0.375 3,500.00 1,312.50
2 Semen Portland Kg 0.030 1,375.00 41.25
Jumlah Bahan 1,353.75
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 35,453.75
E. Overhead & Profit 10% X D 3,545.38
F. Harga Satuan Pekerjaan ( D+E ) 38,999.13

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Langit-Langit Multyplek Ukuran 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.1000 150,000.00 15,000.00
2 Tukang OH 0.0500 165,000.00 8,250.00
3 Kepala tukang OH 0.0050 175,000.00 875.00
4 Mandor OH 0.0050 170,000.00 850.00
Jumlah Tenaga Kerja 24,975.00
B. BAHAN
1 Multyplek 4 mm Bh 0.3640 75,000.00 27,300.00
2 Semen Portland Kg 0.1100 1,375.00 151.25
Jumlah Bahan 27,451.25
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 52,426.25
E. Overhead & Profit 10% X D 5,242.63
F. Harga Satuan Pekerjaan ( D+E ) 57,668.8750
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang List Profil kayu
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0500 150,000.00 7,500.00
2 Tukang OH 0.0500 165,000.00 8,250.00
3 Kepala tukang OH 0.0050 175,000.00 875.00
4 Mandor OH 0.0030 170,000.00 510.00
Jumlah Tenaga Kerja 17,135.00
B. BAHAN
1 List Profil M 1.0500 8,000.00 8,400.00
2 Paku Kayu Kg 0.0100 18,000.00 180.00
Jumlah Bahan 8,580.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 25,715.00
E. Overhead & Profit 10% X D 2,571.50
F. Harga Satuan Pekerjaan ( D+E ) 28,286.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Atap Seng Genteng
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.32
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.2000 150,000.00 30,000.00
2 Tukang OH 0.1000 165,000.00 16,500.00
3 Kepala tukang OH 0.0100 175,000.00 1,750.00
4 Mandor OH 0.0010 170,000.00 170.00
Jumlah Tenaga Kerja 48,420.00
B. BAHAN
1 Atap Seng Genteng Lbr 1.1500 75,000.00 86,250.00
2 Paku Seng Kg 0.2000 20,000.00 4,000.00
Jumlah Bahan 90,250.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 138,670.00
E. Overhead & Profit 10% X D 13,867.00
F. Harga Satuan Pekerjaan ( D+E ) 152,537.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Rabung Seng Atap
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.39.a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.1500 150,000.00 22,500.00
2 Tukang OH 0.0700 165,000.00 11,550.00
3 Kepala tukang OH 0.0070 175,000.00 1,225.00
4 Mandor OH 0.0200 170,000.00 3,400.00
Jumlah Tenaga Kerja 38,675.00
B. BAHAN
1 Rabung Seng Genteng M 0.3000 130,000.00 39,000.00
2 Paku Seng Kg 0.2160 20,000.00 4,320.00
Jumlah Bahan 43,320.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 81,995.00
E. Overhead & Profit 10% X D 8,199.50
F. Harga Satuan Pekerjaan ( D+E ) 90,194.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Dan Memasang Kusen Pintu Dan
Kusen Jendela, Kayu Kelas 1
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.7000 150,000.00 105,000.00
2 Tukang OH 21.0000 165,000.00 3,465,000.00
3 Kepala tukang OH 2.1000 175,000.00 367,500.00
4 Mandor OH 0.3500 170,000.00 59,500.00
Jumlah Tenaga Kerja 3,997,000.00
B. BAHAN
1 Balok Kayu Kelas 1 M3 1.1000 5,500,000.00 6,050,000.00
2 Paku Kayu Kg 1.2500 18,000.00 22,500.00
3 Lem Kayu Kg 1.0000 18,000.00 18,000.00
Jumlah Bahan 6,090,500.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 10,087,500.00
E. Overhead & Profit 10% X D 1,008,750.00
F. Harga Satuan Pekerjaan ( D+E ) 11,096,250.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Membuat Dan Memasang Daun Pintu Panel, Kayu Kls II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.0000 150,000.00 150,000.00
2 Tukang OH 3.0000 165,000.00 495,000.00
3 Kepala tukang OH 0.3000 175,000.00 52,500.00
4 Mandor OH 0.0500 170,000.00 8,500.00
Jumlah Tenaga Kerja 706,000.00
B. BAHAN
1 Papan Kayu Kelas II M3 0.0400 4,800,000.00 192,000.00
2 Lem Kayu Kg 0.5000 18,000.00 9,000.00
Jumlah Bahan 201,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 907,000.00
E. Overhead & Profit 10% X D 90,700.00
F. Harga Satuan Pekerjaan ( D+E ) 997,700.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Membuat Dan Memasang Daun Jendela Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.6
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.8000 150,000.00 120,000.00
2 Tukang OH 2.4000 165,000.00 396,000.00
3 Kepala tukang OH 0.2400 175,000.00 42,000.00
4 Mandor OH 0.0400 170,000.00 6,800.00
Jumlah Tenaga Kerja 564,800.00
B. BAHAN
1 Papan Kayu Kelas II M3 0.0240 4,800,000.00 115,200.00
2 Lem Kayu Kg 0.3000 18,000.00 5,400.00
Jumlah Bahan 120,600.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 685,400.00
E. Overhead & Profit 10% X D 68,540.00
F. Harga Satuan Pekerjaan ( D+E ) 753,940.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Jalusi Kusen, Kayu Kelas I
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.10
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.6700 150,000.00 100,500.00
2 Tukang OH 2.0000 165,000.00 330,000.00
3 Kepala tukang OH 0.2000 175,000.00 35,000.00
4 Mandor OH 0.3350 170,000.00 56,950.00
Jumlah Tenaga Kerja 522,450.00
B. BAHAN
1 Papan Kayu Kelas I M3 0.0600 5,500,000.00 330,000.00
2 Paku Kayu Kg 0.1500 18,000.00 2,700.00
Jumlah Bahan 332,700.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 855,150.00
E. Overhead & Profit 10% X D 85,515.00
F. Harga Satuan Pekerjaan ( D+E ) 940,665.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Konstruksi Kuda-Kuda, Kayu Kelas I
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.14
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 6.7000 150,000.00 1,005,000.00
2 Tukang OH 10.1000 165,000.00 1,666,500.00
3 Kepala tukang OH 2.0100 175,000.00 351,750.00
4 Mandor OH 0.3350 170,000.00 56,950.00
Jumlah Tenaga Kerja 3,080,200.00
B. BAHAN
1 Balok Kayu Kelas I M3 1.2000 5,500,000.00 6,600,000.00
2 Besi Strip Tebal 5 mm Kg 15.0000 150,000.00 2,250,000.00
3 Paku Kayu Kg 5.6000 18,000.00 100,800.00
Jumlah Bahan 8,950,800.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 12,031,000.00
E. Overhead & Profit 10% X D 1,203,100.00
F. Harga Satuan Pekerjaan ( D+E ) 13,234,100.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Konstruksi Gordeng, Kayu Kelas II
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.15
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 2.4000 150,000.00 360,000.00
2 Tukang OH 7.2000 165,000.00 1,188,000.00
3 Kepala tukang OH 0.7200 175,000.00 126,000.00
4 Mandor OH 0.1200 170,000.00 20,400.00
Jumlah Tenaga Kerja 1,694,400.00
B. BAHAN
1 Balok Kayu Kelas I M3 1.1000 5,500,000.00 6,050,000.00
2 Besi Strip Tebal 5 mm Kg 15.0000 150,000.00 2,250,000.00
3 Paku Kayu Kg 3.0000 18,000.00 54,000.00
Jumlah Bahan 8,354,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 10,048,400.00
E. Overhead & Profit 10% X D 1,004,840.00
F. Harga Satuan Pekerjaan ( D+E ) 11,053,240.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Rangka Langit-Langit Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.20
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.2000 150,000.00 30,000.00
2 Tukang OH 0.3000 165,000.00 49,500.00
3 Kepala tukang OH 0.0300 175,000.00 5,250.00
4 Mandor OH 0.0100 170,000.00 1,700.00
Jumlah Tenaga Kerja 86,450.00
B. BAHAN
1 Kayu Kaso 5 x 7 cm M3 0.0163 325,000.00 5,297.50
2 Paku Kayu Kg 0.2500 18,000.00 4,500.00
Jumlah Bahan 9,797.50
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 96,247.50
E. Overhead & Profit 10% X D 9,624.75
F. Harga Satuan Pekerjaan ( D+E ) 105,872.25
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Listplank Uk. 2,5x20 Cm Kayu Kelas I
Atau Kelas II
Satuan / Unit : M'
Analisa : AHSP PU A.4.6.1.21
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.1000 150,000.00 15,000.00
2 Tukang OH 0.2000 165,000.00 33,000.00
3 Kepala tukang OH 0.0200 175,000.00 3,500.00
4 Mandor OH 0.0050 170,000.00 850.00
Jumlah Tenaga Kerja 52,350.00
B. BAHAN
1 Kayu Kelas II M3 0.0108 4,800,000.00 51,840.00
2 Paku Kg 0.1000 18,000.00 1,800.00
Jumlah Bahan 53,640.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 105,990.00
E. Overhead & Profit 10% X D 10,599.00
F. Harga Satuan Pekerjaan ( D+E ) 116,589.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Kunci Silinder
Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.4
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0050 150,000.00 750.00
2 Tukang OH 0.5000 165,000.00 82,500.00
3 Kepala tukang OH 0.0500 175,000.00 8,750.00
4 Mandor OH 0.0030 170,000.00 510.00
Jumlah Tenaga Kerja 92,510.00
B. BAHAN
1 Kunci Pintu Standar Bh 1.0000 150,000.00 150,000.00
Jumlah Bahan 150,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 242,510.00
E. Overhead & Profit 10% X D 24,251.00
F. Harga Satuan Pekerjaan ( D+E ) 266,761.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Engsel Pintu
Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.5
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0150 150,000.00 2,250.00
2 Tukang OH 0.1500 165,000.00 24,750.00
3 Kepala tukang OH 0.0150 175,000.00 2,625.00
4 Mandor OH 1.0008 170,000.00 170,136.00
Jumlah Tenaga Kerja 199,761.00
B. BAHAN
1 Engsel Pintu Bh 1.0000 30,000.00 30,000.00
Jumlah Bahan 30,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 229,761.00
E. Overhead & Profit 10% X D 22,976.10
F. Harga Satuan Pekerjaan ( D+E ) 252,737.10

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Engsel Jendela Kupu-Kupu
Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.6
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0150 150,000.00 2,250.00
2 Tukang OH 0.1500 165,000.00 24,750.00
3 Kepala tukang OH 0.0150 175,000.00 2,625.00
4 Mandor OH 1.0008 170,000.00 170,136.00
Jumlah Tenaga Kerja 199,761.00
B. BAHAN
1 Engsel Jendela Bh 1.0000 25,000.00 25,000.00
Jumlah Bahan 25,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 224,761.00
E. Overhead & Profit 10% X D 22,476.10
F. Harga Satuan Pekerjaan ( D+E ) 247,237.10
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Hak / Kait Angin Jendela
Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.9
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0150 150,000.00 2,250.00
2 Tukang OH 0.1500 165,000.00 24,750.00
3 Kepala tukang OH 0.0150 175,000.00 2,625.00
4 Mandor OH 0.0008 170,000.00 136.00
Jumlah Tenaga Kerja 29,761.00
B. BAHAN
1 Hak Angin Jendela Bh 1.0000 18,000.00 18,000.00
Jumlah Bahan 18,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 47,761.00
E. Overhead & Profit 10% X D 4,776.10
F. Harga Satuan Pekerjaan ( D+E ) 52,537.10

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Pacok Jendela
Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.10
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0150 150,000.00 2,250.00
2 Tukang OH 0.1500 165,000.00 24,750.00
3 Kepala tukang OH 0.0150 175,000.00 2,625.00
4 Mandor OH 0.0008 170,000.00 136.00
Jumlah Tenaga Kerja 29,761.00
B. BAHAN
1 Pacok Jendela Bh 1.0000 7,500.00 7,500.00
Jumlah Bahan 7,500.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 37,261.00
E. Overhead & Profit 10% X D 3,726.10
F. Harga Satuan Pekerjaan ( D+E ) 40,987.10
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Kloset Jongkok Porselen
Satuan / Unit : Buah
Analisa : AHSP PU A.5.1.1.2
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.0000 150,000.00 150,000.00
2 Tukang OH 1.5000 165,000.00 247,500.00
3 Kepala tukang OH 1.5000 175,000.00 262,500.00
4 Mandor OH 0.1600 170,000.00 27,200.00
Jumlah Tenaga Kerja 687,200.00
B. BAHAN
1 Kloset Jongkok Porselen Bh 1.0000 350,000.00 350,000.00
2 Semen Portland Kg 6.0000 1,375.00 8,250.00
3 Pasir Pasang M3 0.0100 190,000.00 1,900.00
Jumlah Bahan 360,150.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,047,350.00
E. Overhead & Profit 10% X D 104,735.00
F. Harga Satuan Pekerjaan ( D+E ) 1,152,085.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang 1 Buah Urinoir
Satuan / Unit : Buah
Analisa : AHSP PU A.5.1.1.4
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.0000 150,000.00 150,000.00
2 Tukang OH 1.0000 165,000.00 165,000.00
3 Kepala tukang OH 0.1000 175,000.00 17,500.00
4 Mandor OH 0.0500 170,000.00 8,500.00
Jumlah Tenaga Kerja 341,000.00
B. BAHAN
1 Urinoir Bh 1.0000 2,500,000.00 2,500,000.00
2 Semen Portland Kg 6.0000 1,375.00 8,250.00
3 Pasir Pasang M3 0.0100 190,000.00 1,900.00
4 Perlengkapan % 30.0000 -
Jumlah Bahan 2,510,150.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 2,851,150.00
E. Overhead & Profit 10% X D 285,115.00
F. Harga Satuan Pekerjaan ( D+E ) 3,136,265.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Floor Drain
Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.14
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0100 150,000.00 1,500.00
2 Tukang OH 0.1000 165,000.00 16,500.00
3 Kepala tukang OH 0.0100 175,000.00 1,750.00
4 Mandor OH 0.0050 170,000.00 850.00
Jumlah Tenaga Kerja 20,600.00
B. BAHAN
1 Floor Drain Bh 1.0000 27,000.00 27,000.00
Jumlah Bahan 27,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 47,600.00
E. Overhead & Profit 10% X D 4,760.00
F. Harga Satuan Pekerjaan ( D+E ) 52,360.00

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Memasang Kran Air dia. 1/2" atau 3/4
Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.19
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0100 150,000.00 1,500.00
2 Tukang OH 0.1000 165,000.00 16,500.00
3 Kepala tukang OH 0.0100 175,000.00 1,750.00
4 Mandor OH 0.0050 170,000.00 850.00
Jumlah Tenaga Kerja 20,600.00
B. BAHAN
1 Floor Drain Bh 1.0000 27,000.00 27,000.00
Jumlah Bahan 27,000.00
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 47,600.00
E. Overhead & Profit 10% X D 4,760.00
F. Harga Satuan Pekerjaan ( D+E ) 52,360.00
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 m2 kaca tebal 5 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.2.17
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0150 150,000.00 2,250.00
2 Tukang OH 0.1500 165,000.00 24,750.00
3 Kepala tukang OH 0.0150 175,000.00 2,625.00
4 Mandor OH 0.0008 170,000.00 136.00
Jumlah Tenaga Kerja 29,761.00
B. BAHAN
1 Kaca Tebal 5 mm M2 1.1000 120,000.00 132,000.00
2 Sealant Tube 0.0500 15,500.00 775.00
Jumlah Bahan 132,775.00
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 162,536.00
E. Overhead & Profit 10% X D 16,253.60
F. Harga Satuan Pekerjaan ( D+E ) 178,789.60

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengecatan Bidang kayu Lama
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4a
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0700 150,000.00 10,500.00
2 Tukang OH 0.0090 165,000.00 1,485.00
3 Kepala tukang OH 0.0060 175,000.00 1,050.00
4 Mandor OH 0.0030 170,000.00 510.00
Jumlah Tenaga Kerja 13,545.00
B. BAHAN
1 Pengencer/Minyak Cat Liter 0.0300 25,000.00 750.00
2 Cat Kayu Penutup Kg 0.1700 60,000.00 10,200.00
Jumlah Bahan 10,950.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 24,495.00
E. Overhead & Profit 10% X D 2,449.50
F. Harga Satuan Pekerjaan ( D+E ) 26,944.50
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengecatan Bidang kayu Baru (1 x plamir, 1 x cat dasar,
2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0700 150,000.00 10,500.00
2 Tukang OH 0.0090 165,000.00 1,485.00
3 Kepala tukang OH 0.0060 175,000.00 1,050.00
4 Mandor OH 0.0030 170,000.00 510.00
Jumlah Tenaga Kerja 13,545.00
B. BAHAN
1 Cat Menie Kg 0.2000 40,000.00 8,000.00
2 Plamir Kayu Kg 0.1500 18,000.00 2,700.00
3 Cat Dasar Kayu Kg 0.1700 45,000.00 7,650.00
4 Cat Kayu Penutup Kg 0.2600 60,000.00 15,600.00
5 Kuas Bh 0.0100 15,000.00 150.00
6 Pengencer Liter 0.0300 25,000.00 750.00
7 Ampelas Lembar 0.2000 3,500.00 700.00
Jumlah Bahan 35,550.00
C. PERALATAN
Jumlah Peralatan -
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 49,095.00
E. Overhead & Profit 10% X D 4,909.50
F. Harga Satuan Pekerjaan ( D+E ) 54,004.50

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan : Pengecetan Tembok Baru (1 x plamir, 1 x cat dasar,
2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0200 150,000.00 3,000.00
2 Tukang OH 0.0630 165,000.00 10,395.00
3 Kepala tukang OH 0.0063 175,000.00 1,102.50
4 Mandor OH 0.0025 170,000.00 425.00
Jumlah Tenaga Kerja 14,922.50
B. BAHAN
1 Plamir Kg 0.1000 30,000.00 3,000.00
2 Cat Dasar Tembok Kg 0.1000 40,000.00 4,000.00
3 Cat Tembok / Penutup 2x Kg 0.2600 50,000.00 13,000.00
Jumlah Bahan 20,000.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 34,922.50
E. Overhead & Profit 10% X D 3,492.25
F. Harga Satuan Pekerjaan ( D+E ) 38,414.75
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengecetan Tembok Lama (1 x Cat Dasar,
2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.11
No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0280 150,000.00 4,200.00
2 Tukang OH 0.0420 165,000.00 6,930.00
3 Kepala tukang OH 0.0042 175,000.00 735.00
4 Mandor OH 0.0025 170,000.00 425.00
Jumlah Tenaga Kerja 12,290.00
B. BAHAN
1 Cat Dasar Tembok Kg 0.1200 40,000.00 4,800.00
2 Cat Tembok/Penutup 2x Kg 0.1800 50,000.00 9,000.00
Jumlah Bahan 13,800.00
C. PERALATAN
Jumlah Peralatan
D. Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 26,090.00
E. Overhead & Profit 10% X D 2,609.00
F. Harga Satuan Pekerjaan ( D+E ) 28,699.00
NO

Lebar
Panjang

Luas (PxL)
GAMBAR :
1. Pembersihan Lahan

2.00
I. PEKERJAAN PERSIAPAN

= 19
= 22

= 418
GUDANG
+ 0.05

PERHITUNGAN
R.CUCI
- 0.05

KM/WC TERAS
- 0.05
- 0.05

418
VOL

M2
SAT
DAPUR
± 0.00
18.00 R.MAKAN/ R.KELG 22.00
± 0.00 KM/WC
- 0.05

R.TIDUR
KM/WC
+ 0.05
- 0.05
LANTAI 1

Garasi
- 0.05

TERAS
- 0.05

2.00

19.00
2. Pasang Bawplank/Pengukuran
GAMBAR :

20.0

17.0
15.0
1.0

18.0
1.0

PERHITUNGAN VOL SAT


Panjang = 20 M
Lebar = 17 M
Keliling = 2(P+L) 74 M'
II. PEKERJAAN TANAH PONDASI TAPAK
GAMBAR : 8
2 .0 0

A
7

2 Ø 20
4 .5 0

P-1 P-1
Ø12 - 12
P-1

6 P-1 P-1
B B
1 . 51 0. 0 0 3 . 0 0 2 . 5 0 3 . 5 0

Ø12 - 20
P-1 P-1

Ø12- 12
P-1 P-1
38 80
P-1 P-1 P-1
5 P-1 P-1
P-1

2 Ø 20 Ø12 - 20
4 P-1 P-1 P-1
P-1
P-1
P-1 P-1

13
A
3 P-1

2 P-1 P-1
80
1 P-1 P-1

5.00 1.00 3.00 1.00 5.00


A B C D E F
NO PERHITUNGAN VOL SAT GAMBAR
I PEKERJAAN PONDASI TAPAK 80/80
a. Galian Tanah 2 Ø 12
Tinggi = 1.2 M
2 Ø 12
Lebar = 1 M Ø6 - 15
Panjang = 1 M
2 Ø 12
Unit = 27 Unit 13

Volume = (PxLxT)xUnit 32.40 M3

b. Urungan Tanah Kembali LANTAI KERAMIK

Volume = 3/4 x Volume Galian SPESI


P ASIR URUG
Volume Galian Tanah = 32.4 LANTAI ±0 .00

24.3 M 3 7
0.10
c. Pasir Alas
Tinggi = 0.05 M
Lebar = 1 M
Panjang = 1 M TANAH URUG TANAH URUG
Unit = 27 Unit 1.70
1.55
Volume = ( P x L x T ) x Unit 1.35 M3

d. Lantai Kerja/Coran
2.75
Tinggi = 0.1 M
Lebar = 1 M
Panjang = 1 M
Unit = 27 Unit Ø12-15
6Ø20
Volume = (PxLxT)xUnit 2.7 M3 0.80
1.20
e. Pondasi Tapak Berulang 1:2:3
Pias I 0.10 Ø12-12

Tinggi = 0.15 M 0.15 4Ø20


Ø12-12
Lebar = 0.8 M 0.10
0.05
Panjang = 0.8 M 0.10 0.21 0.38 0.21 0.10
Unit = 27 Unit 1.00
0.10 Ø12-12

0.15 4Ø20
Ø12-12
0.10
0.05
0.10 0.21 0.38 0.21 0.10
1.00
Volume = ( P x L x T ) x Unit 2.59 M3
Ø6 - 15
2 Ø 12 2 Ø 12 2 Ø 12
Pias II
Tinggi = 0.1 M
Lebar = 0.8 M
Panjang = 0.8 M
Unit = 27 Unit
LANTAI KERAMIK
Volume = (( P x L x 1/2XT ) x Unit 0.86 M3 SP ESI
P ASIR URUG
LANTAI ±0 .0 0
7
Pias III 0.10
Tinggi = 0.8 M
Lebar = 0.13 M
Panjang = 0.38 M
Unit = 27 Unit
Volume = ( P x L x T ) x Unit 1.07 M3 TANAH URUG TANAH URUG 1.55
1.70

Volume Total = 2,59+0,86+1,07 4.52 M3

Ø12-15
6Ø20
0.80
1.20

Ø12-12
12 0.10
4Ø20
Ø12-12
0.15
0.10
0.05
0.10 0.21 0.38 0.21 0.10
1.00
NO
3.5 5.0 3.5 3.0 GAMBAR :

2.0 2.0

PERHITUNGAN
III PEKERJAAN TANAH PONDASI MENERUS

2.5
4.5
2.0

1.5

VOL
15.5
3.5
2.0

SAT
1.0
2.5
4.5
3.5
3.0
2.0
1.0
1.5 1.5

5.0 3.0 5.0


1.0 1.0
GAMBAR
a. GalianPondasi Menerus
Panjang Horizontal = 68.2 M
Panjang Vertikal = 57 M
Total Panjang = 125.2 M
Tinggi = 1 M
Lebar = 0.90 M
Volume = (P*L*T)
(125,2 x 0,90 x 1) 112.68 M3

b Urugan Kembali Pondasi Menerus


Volume = 1/4*Vol. Galian pond. Menerus
= 1/4*(112,68) 28.17 M3
Sloof S=25 / 40
c Pasir Alas Pondasi Menerus
Tinggi = 0.05 M Angker Ø 12 - 100
Lebar = 0.90 M
80
Panjang = 125.2 M
Pond. Batu gunung
Volume = (P*L*T) 5.63 M3 Tanah Urug
= (125,5*0,90*0,05)
Pas. Batu Kosong
d Aanstamping Pondasi Menerus
Tinggi = 0.15 M Pasir Alas
Lebar = 0.90 M 15
= 125.2 M
Panjang
= (P*L*T) 16.90 M3
5
Volume
= 125,2*0,90*0,15 35
e Pas. Batu Gunung
Tinggi = 0.8 M 10 70 10
Lebar a = 0.35 M
Lebar b = 0.7 M
Panjang = 125.2 M
Volume = (( a + b )/2 x P x T )) 52.584 M3
((0,35+0,7)/2)x125,2x0,8

f Sloof 25/40
Tinggi = 0.4 M
Lebar = 0.25 M
Panjang = 125.2 M
Volume = (P*L*T) 12.52 M3
125,2x0,25x0,4
IV PEKERJAAN LANTAI
GAMBAR :

Lantai Keramik 30 x 30 cm + spesi


Beton Cor 1 : 3 : 5 t = 7 cm
Pasir Urug t = 10 cm

- 0 .0 5 ± 0 .0 0
125
3
15 7
10
15

26
67

25

Sloof S=25 / 40
Angker Ø 12 - 100
80 80
Pond. Batu gunung
Tanah Urug
Pas. Batu Kosong
Pasir Alas
15 15
5 5
35 35

70 10 10 70 10
25

NO PERHITUNGAN VOL SAT GAMBAR


1 Urugan Tanah Bawah lantai
a Bawah Tangga Teras Depan
Tinggi = 0.25 M
Lebar = 0.64 M
Panjang = 8.96 M
Volume = (PxLxT)
= (8,96 x 0,64 x 0,25) 1.43 M3

b Tangga Depan Elv. -0.35 (Bagian 1)


Tinggi = 0.11 M
Lebar = 0.17 M
Panjang = 5.39 M
Volume = (PxLxT)
= (5,39 x 0,17 x 0,11) 0.10 M3

c. Tangga Depan Elv. -0.20 (Bagian 2)


Tinggi = 0.26 M
Lebar
Panjang
= 0.17
= 5.39
M
M
- 0.05
Volume = (PxLxT)
= (5,39 x 0,17 x 0,26) 0.24 M3

d Teras 15
Teras Depan Elv. -0,05 (Bagian 1)
Tinggi = 0.67 M 15
Lebar = 1.25 M
Panjang = 2.78 M
Volume = (PxLxT)
(2,78x1,25x0,67) 2.33 M3
24
5
Teras Belakang Elv. -0,05 (Bagian 2)
Tinggi = 0.67
3
Lebar = 1.75
Panjang = 4.75
Volume = (PxLxT)
(4,75x1,75x0,67) 5.57
e Tangga Belakang Elv. -0.35 (Bagian 1)
Tinggi = 0.11 M
Lebar = 0.17 M
Panjang = 6.69 M
Volume = (PxLxT)
= (6,69x 0,17 x 0,11) 0.13 M3

f Tangga Elv. -0.20 (Bagian 2)


Tinggi = 0.26 M
Lebar = 0.17 M
Panjang = 6.69 M
Volume = (PxLxT)
= (6,69 x 0,17 x 0,26) 0.30 M3

g R.Tidur Elv. +0,05


Tinggi = 0.71 M
Lebar = 5.25 M
Panjang = 4.25 M
Volume = (PxLxT)
(4,25x5,25x0,71) 15.84 M3
h Kamar Mandi
Kamar Mandi -0.05 (Bagian 1)
Tinggi = 0.67 M
Lebar = 1.75 M
Panjang = 2.75 M
Volume = (PxLxT)
(2,75x1,75x0,67) 3.22 M3
Lantai Keramik 40 x 40 cm + spesi
Kamar Mandi -0.05 (Bagian 2)
Tinggi = 0.67 M Beton Cor 1 : 3 : 5 t = 7 cm
Lebar = 1.75 M
Panjang = 1.75 M Pasir Urug t = 10 cm
Volume = (PxLxT)
(1,75x1,75x0,67) 2.05 M3 + 0.00 ± 0.00
Kamar Mandi -0.05 (Bagian 3) 3
I 7 3
= 0.67 10 7
Tinggi M
Lebar = 1.25 M 10
Panjang = 1.50 M
Volume = (PxLxT)
= (1,50x1,25x0,67) 1.26 M3
II
Tinggi = 0.67 M 70
Lebar = 0.5 M
Panjang = 1 M
Volume = (PxLxT)
= (1x0,5x0,67) 0.34 M3

Volume Total = 1,26 + 0,34 1.59 M3


i Garasi Elv.-0.05
I
Tinggi = 0.67 M
Lebar = 4.75 M
Panjang = 5.25 M
Volume = (PxLxT)
(5,25x4,75x0,67) 16.7081 M3
II
Tinggi = 0.67 M
Lebar = 0.75 M
Panjang = 0.5 M
Volume = (PxLxT)
0,5x0,75x0,67) 0.251

Volume Total = 16,708 + 0,251 16.96 M3

j R.Tangga Lt-1 Elv. ± 0.00


Tinggi = 0.7 M
Lebar = 1 M
Panjang = 2.25 M
Volume = (PxLxT)
= (2,25x1x0,7) 1.58 M3

k R.Tamu Elv. ± 0.00


I
Tinggi = 0.7 M
Lebar = 3.75 M
Panjang = 4.25 M
Volume = (PxLxT)
= (4,25x3,75x0,7) 11.16 M3
II
Tinggi = 0.7 M
Lebar = 0.5 M
Panjang = 1.75 M
Volume = (PxLxT)
= (1,75x0,5x0,7) 0.61 M3

Volume Total = 11,16 + 0,61 11.77 M3


l Gudang Elv. +0.05
Tinggi = 0.71 M
Lebar = 1.75 M
Panjang = 3.25 M
Volume = (PxLxT)
= (3,25x1,75x0,71) 4.04 M3

m R.Cuci Elv. -0.05


I
Tinggi = 0.67 M
Lebar = 2.25 M
Panjang = 3.25 M
Volume = (PxLxT)
(3,25x2,25x0,67) 4.90 M3
Lantai Keramik 30 x 30 cm + spesi
II
Tinggi = 0.67 M Beton Cor 1 : 3 : 5 t = 7 cm
Lebar = 1.25 M
Panjang = 2 M
Pasir Urug t = 10 cm
Volume = (PxLxT)
(2x1,25x0,67) 1.68 M3 - 0.05

= 4,90 + 1,68
Volume Total 6.57 M3 3
7
10
n R.Makan/R.Keluarga/Dapur Elv. ± 0.00
I
Tinggi = 0.7 M
Lebar = 3.25 M
Panjang = 11.75 M 67
Volume = (PxLxT)
(11,75x3,25x0,7) 26.73 M3
II
Tinggi = 0.7 M
Lebar = 1.25 M
Panjang = 2.75 M
Volume = (PxLxT)
(2,75x1,25x0,7) 2.41 M3
III
Tinggi = 0.7 M
Lebar = 0.5 M
Panjang = 1 M
Volume = (PxLxT)
= 1x0,5x0,7) 0.35 M3

Volume Total = 26,73 + 2,41 + 0,35 29.49 M3

Volume Total Urugan Tanah Dibawah Lantai


Volume Total = (a+b+c+d+e+f+g+h+i+j+k+l+ 103.20 M3
m+n)
NO PERHITUNGAN VOL SAT GAMBAR
2 Pasir Urug Bawah lantai
a Tangga Teras - 0.05
Depan
Tinggi = 0.03 M
Lebar = 0.64 M
Panjang = 5.39 M 15
Volume = (PxLxT)
= (8,96 x 0,64 x 0,25) M3
0.10
15
Belakang
Tinggi = 0.03 M
Lebar = 0.69 M 24
Panjang = 6.69 M
Volume = (PxLxT)
3 5
= (6,69 x 0,69 x 0,25) 0.14 M3

b Tangga Depan Elv. -0.35 (Bagian 1)


Tinggi = 0.1 M Lantai Keramik 30 x 30 cm + spesi
Lebar = 0.17 M
Panjang = 5.39 M
Beton Cor 1 : 3 : 5 t = 7 cm
Volume = (PxLxT) Pasir Urug t = 10 cm
= (5,39 x 0,17 x 0,1) 0.09 M3
- 0.05
c. Tangga Depan Elv. -0.20 (Bagian 2)
Tinggi = 0.1 M
Lebar = 0.17 M 3
Panjang = 5.39 M
7
Volume = (PxLxT) 10
= (5,39 x 0,17 x 0,1) 0.09 M3

d Teras
Teras Depan Elv. -0,05 (Bagian 1) 67
Tinggi = 0.1 M
Lebar = 1.37 M
Panjang = 2.9 M
Volume = (PxLxT)
(2,9x1,37x0,1) 0.40 M3

Teras Belakang Elv. -0,05 (Bagian 2)


Tinggi = 0.1
Lebar = 1.87
Panjang = 4.87
Volume = (PxLxT)
(4,87x1,87x0,1) 0.91

e Tangga Belakang Elv. -0.35 (Bagian 1)


Tinggi = 0.1 M
Lebar = 0.17 M
Panjang = 6.69 M
Volume = (PxLxT)
= (6,69 x 0,17 x 0,1) 0.11 M3

f Tangga Belakang Elv. -0.20 (Bagian 2)


Tinggi = 0.10 M Lantai Keramik 40 x 40 cm + spesi
Lebar = 0.17 M
Panjang = 6.69 M
Beton Cor 1 : 3 : 5 t = 7 cm
Volume = (PxLxT) Pasir Urug t = 10 cm
= (6,69 x 0,17 x 0,1) 0.11 M3
+ 0.00 ± 0.00
3
g R.Tidur Elv. +0,05 7 3
Tinggi = 0.1 M
10 7
Lebar = 4.37 M 10
Panjang = 5.37 M
Volume = (PxLxT)
(5,37x4,37x0,1) 2.35 M3
h Kamar Mandi
Kamar Mandi -0.05 (Bagian 1)
Tinggi = 0.1 M 70
Lebar = 1.87 M
Panjang = 2.87 M
Volume = (PxLxT)
(2,87x1,87x0,1) 0.54 M3

Kamar Mandi -0.05 (Bagian 2)


Tinggi = 0.1 M
Lebar = 1.87 M
Panjang = 1.87 M
Volume = (PxLxT)
(1,87x1,87x0,1) 0.35 M3

Kamar Mandi -0.05 (Bagian 3)


I
Tinggi = 0.1 M
Lebar = 1.37 M
Panjang = 1.62 M
Volume = (PxLxT)
= (1,62x1,37x0,1) 0.22 M3
II
Tinggi = 0.1 M
Lebar = 0.5 M
Panjang = 1.12 M
Volume = (PxLxT)
= (1,12x0,5x0,1) 0.06 M3 Lantai Keramik 30 x 30 cm + spesi
Beton Cor 1 : 3 : 5 t = 7 cm
Volume Total = 0,22+0,06 0.28 M3
Pasir Urug t = 10 cm
i Garasi Elv.-0.05 - 0.05
I
Tinggi = 0.1 M
Lebar = 4.87 M 3
Panjang = 5.37 M 7
Volume = (PxLxT) 10
(5,37x4,87x0,1) 2.62 M3

II
Tinggi = 0.1 M
Lebar = 0.5 M
67
Panjang = 0.87 M
Volume = (PxLxT)
(0,87x0,5x0,1) 0.044

Volume Total = 2,62+ 0,044 2.66 M3

j R.Tangga Lt-1 Elv. ± 0.00


Tinggi = 0.1 M
Lebar = 1.12 M
Panjang = 2.37 M
Volume = (PxLxT)
= (2,37x1,12x0,1) 0.27 M3
k R.Tamu Elv. ± 0.00
I
Tinggi = 0.1 M
Lebar = 3.87 M
Panjang = 4.37 M
Volume = (PxLxT)
= (4,37x3,87x0,1) 1.69 M3

II
Tinggi = 0.1 M
Lebar = 0.5 M
Panjang = 1.87 M
Volume = (PxLxT)
= (1,87x0,5x0,1) 0.09 M3

Volume Total = 1,69 + 0,09 1.78 M3

l Gudang Elv. +0.05


Tinggi = 0.1 M
Lebar = 1.87 M
Panjang = 3.37 M
Volume = (PxLxT)
= (3,37x1,87x0,1) 0.63 M3
m R.Cuci Elv. -0.05
I
Tinggi = 0.1 M
Lebar = 2.37 M
Panjang = 3.37 M
Volume = (PxLxT) M2
(3,37x2,37x0,1) 0.80 M3

II
Tinggi = 0.1 M
Lebar = 1.37 M
Panjang = 2 M
Volume = (PxLxT) M2
(2x1,37x0,1) 0.27 M3

Volume Total = 0,80 + 0,27 1.07 M3

n R.Makan/R.Keluarga/Dapur Elv. ± 0.00


I
Tinggi = 0.1 M
Lebar = 3.37 M
Panjang = 11.87 M
Volume = (PxLxT)
(11,87x3,37x0,1) 4.00 M3

II
Tinggi = 0.1 M
Lebar = 1.37 M
Panjang = 2.63 M
Volume = (PxLxT)
(2,63x1,37x0,1) 0.36 M3
III
Tinggi = 0.1 M
Lebar = 0.5 M
Panjang = 1.12 M
Volume = (PxLxT)
= (1,12x0,5x0,1) 0.06 M3

Volume Total = 4,00 + 0,36 + 0,06 4.42 M3


Volume Total Pasir Urug Dibawah Lantai
= (a+b+c+d+e+f+g+h+i+j+k+l+ 16.30 M3
m+n)
NO PERHITUNGAN VOL SAT GAMBAR
3 Beton Cor Bawah Lantai
a Tangga selasar(Bagian 1)
Depan
- 0.05
Tinggi = 0.05 M
Lebar = 0.64 M
Panjang = 8.72 M
Volume = (PxLxT) 15
= (8,72 x 0,64 x 0,05) 0.28 M3

15
Belakang
Tinggi = 0.05 M
Lebar = 0.69 M
Panjang = 6.69 M
24
Volume = (PxLxT)
= M3 5
(6,69 x 0,69 x 0,05) 0.23
3

b Teras
Teras Depan Elv. -0,05 (Bagian 1)
Tinggi = 0.07 M
Lebar = 1.5 M
Panjang = 2.9 M
Volume = (PxLxT) Lantai Keramik 40 x 40 cm + spesi
(2,9x1,50x0,07) 0.30 M3 Beton Cor 1 : 3 : 5 t = 7 cm
Pasir Urug t = 10 cm
Teras Belakang Elv. -0,05 (Bagian 2)
Tinggi = 0.07 + 0.00 ± 0.00
Lebar =2 3
Panjang = 4.87 7 3
10 7
Volume = (PxLxT) 10
(4,87x2,0x0,07) 0.68

c R.Tidur Elv. +0,05


Tinggi = 0.07 M
70
Lebar = 4.37 M
Panjang = 5.37 M
Volume = (PxLxT)
(5,37x4,37x0,07) 1.64 M3
d Kamar Mandi
Kamar Mandi -0.05 (Bagian 1)
Tinggi = 0.07 M
Lebar = 1.87 M
Panjang = 2.87 M
Volume = (PxLxT)
(2,87x1,87x0,07) 0.38 M3

Kamar Mandi -0.05 (Bagian 2)


Lantai Keramik 30 x 30 cm + spesi
Tinggi = 0.07 M
Lebar = 1.87 M Beton Cor 1 : 3 : 5 t = 7 cm
Panjang = 1.87 M
Volume = (PxLxT) Pasir Urug t = 10 cm
(1,87x1,87x0,07) 0.24 M3
- 0.05
Kamar Mandi -0.05 (Bagian 3)
I
3
Tinggi = 0.07 M 7
Lebar = 1.37 M
Panjang = 1.62 M
10
Volume = (PxLxT)
= (1,62x1,37x0,07) 0.16 M3
II
Tinggi = 0.07 M 67
Lebar = 0.5 M
Panjang = 1.12 M
Volume = (PxLxT)
= (1,12x0,5x0,07) 0.04 M3

Volume Total = 0,16+0,04 0.19 M3


e Garasi Elv.-0.05
I
Tinggi = 0.07 M
Lebar = 4.87 M
Panjang = 5.37 M
Volume = (PxLxT)
(5,37x4,87x0,07) 1.83 M3

II
Tinggi = 0.07 M
Lebar = 0.5 M
Panjang = 0.87 M
Volume = (PxLxT)
(0,87x0,5x0,07) 0.030

Volume Total = 1,83+ 0,030 1.86 M3

f R.Tangga Lt-1 Elv. ± 0.00


Tinggi = 0.07 M
Lebar = 1.12 M
Panjang = 2.37 M
Volume = (PxLxT)
= (2,37x1,12x0,07) 0.19 M3

g R.Tamu Elv. ± 0.00


I
Tinggi = 0.07 M
Lebar = 3.87 M
Panjang = 4.37 M
Volume = (PxLxT)
= (4,37x3,87x0,07) 1.18 M3
II
Tinggi = 0.07 M
Lebar = 0.5 M
Panjang = 1.87 M
Volume = (PxLxT)
= (1,87x0,5x0,07) 0.07 M3

Volume Total = 1,18 + 0,07 1.25 M3


h Gudang Elv. +0.05
Tinggi = 0.07 M
Lebar = 1.87 M
Panjang = 3.37 M
Volume = (PxLxT)
= (3,37x1,87x0,07) 0.44 M3

i R.Cuci Elv. -0.05


I
Tinggi = 0.07 M
Lebar = 2.37 M
Panjang = 3.37 M
Volume = (PxLxT) M2
(3,37x2,37x0,07) 0.56 M3

II
Tinggi = 0.07 M
Lebar = 1.37 M
Panjang = 2 M
Volume = (PxLxT) M2
(2x1,37x0,07) 0.19 M3

Volume Total = 0,56 + 0,19 0.75 M3

j R.Makan/R.Keluarga/Dapur Elv. ± 0.00


I
Tinggi = 0.07 M
Lebar = 3.37 M
Panjang = 11.87 M
Volume = (PxLxT)
(11,87x3,37x0,07) 2.80 M3
II
Tinggi = 0.07 M
Lebar = 1.37 M
Panjang = 2.63 M
Volume = (PxLxT)
(2,63x1,37x0,07) 0.25 M3
III
Tinggi = 0.07 M
Lebar = 0.5 M
Panjang = 1.12 M
Volume = (PxLxT)
= (1,12x0,5x0,07) 0.04 M3

Volume Total = 2,80 + 0,25 + 0,04 3.09 M3

Volume Total Beton Cor Dibawah Lantai


= (a+b+c+d+e+f+g+h+i+j) 11.53 M3
4 Keramik
a Keramik 40 x 40
1 Teras
Teras Depan Elv. -0,05 (Bagian 1)
3.50 8.50 3.00
Lebar = 1.5 M
Panjang = 2.9 M
Volume = (PxL ) 2.00 GUDANG
+ 0.05

(2,9x1,50) 4.35 M2 4.50


R.CUCI
- 0.05
Teras Belakang Elv. -0,05 (Bagian 2) 4.50
Lebar =2 KM/WC TERAS

Panjang = 4.87
- 0.05 - 0.05
2.00
Volume = (PxL )
(4,87x2,0) M2 1.50
9.74
3.50 DAPUR

18.00 2.00
± 0.00

2 R.Tidur Elv. +0,05 R.MAKAN/ R.KELG


± 0.00 KM/WC
- 0.05

Lebar = 4.37 M
Panjang = 5.37 M KM/WC
R.TIDUR
+ 0.05
- 0.05

Volume = (PxL) Garasi 4.50


(5,37x4,37) 23.47 M2 5.50 - 0.05

R.TAMU

3 R.Tangga Lt-1 Elv. ± 0.00


± 0.00

Lebar = 1.12 M 2.00


Panjang = 2.37 M
Volume = (PxL) TERAS
- 0.05
1.50
= (2,37x1,12) 2.65 M2

5.00 5.00 7.00


4 R.Tamu Elv. ± 0.00 12.00
I
Lebar = 3.87 M
Panjang = 4.37 M
Volume = ( P x L)
= (4,37x3,87) 16.91 M2
II
Lebar = 0.5 M
Panjang = 1.87 M
Volume = (PxL)
= (1,87x0,5) 0.94 M2

Volume Total = 16,91 + 0,94 17.85 M2


5 Gudang Elv. +0.05
Lebar = 1.87 M
Panjang = 3.37 M
Volume = (PxL)
= (3,37x1,87x) 6.30 M2

6 R.Makan/R.Keluarga/Dapur Elv. ± 0.00


I
Lebar = 3.37 M
Panjang = 11.87 M
Volume = (PxL)
(11,87x3,37) 40.00 M2

II
Lebar = 1.37 M
Panjang = 2.63 M
Volume = (PxL)
(2,63x1,37) 3.60 M2

III
Lebar = 0.5 M
Panjang = 1.12 M
Volume = (PxL)
= (1,12x0,5x) 0.56 M2

Volume Total = 40 + 3,60 + 0,56 44.17 M2

L.Total = (1+2+3+4+5+6) 108.53 M2


b Keramik 30x30
1 Kamar Mandi
Kamar Mandi -0.05 (Bagian 1)
Lebar = 1.87 M
Panjang = 2.87 M
Volume = (PxL)
(2,87x1,87) 5.37 M2

Kamar Mandi -0.05 (Bagian 2)


Lebar = 1.87 M
Panjang = 1.87 M
Volume = (PxL )
(1,87x1,87) 3.50 M2

Kamar Mandi -0.05 (Bagian 3)


I
Lebar = 1.37 M
Panjang = 1.62 M
Volume = (PxL)
= (1,62x1,37) 2.22 M2
II
Lebar = 0.5 M
Panjang = 1.12 M
Volume = (PxL)
= (1,12x0,5) 0.56 M2

Volume Total = 2,22 + 0,56 2.78 M2

2 Garasi Elv.-0.05
I
Lebar = 4.87 M
Panjang = 5.37 M
Volume = ( P x L)
(5,37x4,87) 26.15 M2
II
Lebar = 0.5 M
Panjang = 0.87 M
Volume = (PxL)
(0,87x0,5) 0.44 M2

Volume Total = 26,15 +0,44 26.59 M2


3 R.Cuci Elv. -0.05
I
Lebar = 2.37 M
Panjang = 3.37 M
Volume = (PxL) M2
(3,37x2,37) 7.99 M2

II
Lebar = 1.37 M
Panjang =2 M
Volume = (PxL) M2
(2x1,37) 2.74 M2

Volume Total = 7,99 + 2,74 10.73 M2

4 Tangga Dan Bordes Tangga


I
Lebar = 2.37 M
Panjang = 3.37 M
Volume = (PxL) M2
(3,37x2,37) 7.99 M2

II
Lebar = 1.37 M
Panjang =2 M
Volume = (PxL) M2
(2x1,37) 2.74 M2

Volume Total = 7,99 + 2,74 10.73 M2

L.Total Keramik 30x30 = 1+2+3+4 59.68 M2


V PEKERJAAN BETON BERTULANG
a Kolom KP 13/13
Tinggi = 4.4 M

KM/WC
- 0.05
Lebar = 0.13 M

+ 0.05
R.TIDUR
Panjang = 0.13 M
Unit = 21 Unit
Volume = (PxLxT)xUnit
(0,13x0,13x4,40)x21 1.56 M3

TERAS
- 0.05
± 0.00
R.MAKAN/ R.KELG
TERAS
- 0.05
b Kolom KI 20/20

KM/WC
- 0.05
Tinggi = 4.4 M
Lebar = 0.2 M

KM/WC
- 0.05
R.CUCI

Garasi
=

- 0.05
Panjang 0.2 M

- 0.05
GUDANG
+ 0.05

DAPUR
± 0.00
Unit = 27 Unit
Volume = (PxLxT)xUnit
(02x0,2x4,4)x24 4.75 M3

c Menghitung Ring Balok


Ring balok 20/30
Tinggi = 0.3 M
Panjang = 125.2 M
Lebar
Volume
= 0.20
= (PxLxT) 7.51
M
30 7Ø12

M3
= (125,2x0,20x0,30)
Ø6-10
VI PEKERJAAN DINDING
GAMBAR : 1 5 .0 0
3.5 0 8.50 3.0 0

2.0 0 GUDANG
+ 0.05

4.50
R.CUCI
- 0.05

4 .50
KM/WC TERAS
- 0.05 - 0.05
2.00

1 .5 0
3 .5 0 DAPUR

1 8.00 2.00
± 0.00
R.MAKAN/ R.KELG
± 0.00 KM/WC
- 0.05

R.TIDUR
KM/WC
+ 0.05
- 0.05

Garasi 4.50
5 .5 0 - 0.05

R.TAMU
± 0.00

2.00

TERAS
- 0.05
1 .5 0

5 .00 5 .00 5 .0 0
15 .0 0

3.50
20/30 20/30
Pas. Bata

3.90 Pas. Bata 1:4


SPESI
PASIR URUG
TANAH URUG
Pas. Trasram 1:2
- 0.05 ± 0.00 + 0.05

0.50
0.40
0.80
0.20 25/40 25/40 25/40 25/40
0.30
0.30 1.00 1.00 1.00 1.00

5.00 5.00 5.00


NO PERHITUNGAN VOL SAT GAMBAR
1. Luas Kusen
a Kusen
Kusen Pintu P1
Tinggi = 2.82 M
Lebar = 1.42 M
Jumlah = 1 Unit
Luas = (LxT)xUnit
(1,42x2,82)x1 4.00 M2
  
Kusen Pintu P3
Tinggi = 2.62 M
Lebar = 0.92 M
Jumlah = 6 Unit
Luas = (LxT)xUnit
= (0,92x2,62)x6 14.46 M2

Kusen Pintu P4   
DETAIL P 3
Tinggi = 2.77 M DETAIL P 1

Lebar = 1.01 M
Jumlah = 4 Unit
Luas = (LxT)xUnit
= (1,01x2,77)x4 11.19 M2

Kusen Pintu P5
Tinggi = 2.16 M
Lebar = 0.8 M   
Jumlah = 3 Unit
Luas = (LxT)xUnit
= (0,80x2,16)x3 5.18 M2

Kusen Pintu Garasi


Tinggi = 2.51 M
Lebar = 3.96 M  
Jumlah = 1 Unit 
DETAIL P 4
DETAIL P5
Luas = (LxT)xUnit
= (4,53x2,51)x1 9.94 M2

Kusen Jendela J1
Tinggi = 2.38 M
Lebar = 0.62 M
Jumlah = 4 Unit
Luas = (LxT)xUnit
= (0,62x2,38)x4 5.90 M2

Kusen Jendela J3

Tinggi = 1.88 M
Lebar = 1.18 M 
Jumlah = 1 Unit
Luas = (LxT)xUnit
= (1,18x1,88)x1 2.22 M2

Kusen Jendela J4 


Tinggi = 1.88 M
DETAIL P. Garasi
Lebar = 1.74 M
Jumlah = 2 Unit
Luas = (LxT)xUnit 
= (1,74x1,88)x2 6.54 M2   DETAIL J 1

 
Kusen Ventilasi V1
Tinggi = 0.3 M DETAIL V2
DETAIL V 1
Lebar = 0.62 M
Jumlah = 1 Unit
Luas = (LxT)xUnit
= (0,62x0,38)x1 0.19 M2

Kusen Ventilasi V2
Tinggi = 0.3 M
Lebar = 1.18 M    
Jumlah = 1 Unit
Luas = (LxT)xUnit
= (1,18x0,3)x1 0.35 M2

Total Luas Kusen = 4,0+14,46+11,19+5,18+9,94+ 59.98


M2  
5,9+6,54+0,19+0,25 DETAIL J 4

DETAIL J 3
b Mengitung Dinding Bata Transram 1 : 2

1 Tinggi = 0.50 M
Panjang = 75.43 M
Luas = PxT
= 75,43x0,50 37.72 M2

2 Dinding Bata Trasram 1 : 2 (Teras Depan)


Tinggi = 0.5 M
Panjang = 4.96 M
Volume = PxT
= 4,96x0,5 2.48 M2

3 Dinding Bata Trasram 1 : 2 (Teras Belakang )


Tinggi = 0.5 M
Panjang = 6.43 M
Volume = PxT
= 6,43x0,5 3.22 M2

4 Dinding Bata Trasram 1 : 2 ( B : Tangga Teras Depan)


Elv. -0.35
Tinggi = 0.21 M
Panjang = 5.59 M
Volume = PxT
= 5,59x0,21 1.17 M2

Elv. -0.20
Tinggi = 0.36 M
Panjang = 5.59 M
Volume = PxT
= 5,59x0,36 2.01 M2

5 Dinding Bata Trasram 1 : 2 ( B : Tangga Teras Belakang)


Elv. -0.35
Tinggi = 0.21 M
Panjang = 7.29 M
Volume = PxT
= 7,29x0,21 1.53 M2
Elv. -0.20
Tinggi = 0.36 M
Panjang = 7.29 M
Volume = PxT
= 7,29x0,36 2.62 M2

6 Dinding Trasram 1 : 2 ( D : Wc)


Tinggi = 1.9 M
Panjang = 24.06 M
Volume = PxT
= 24,06x1,9 45.71 M2
Volume Total = no. 1+2+3+4+5+6 96.47 M2

Volume Total = Volume Dinding Bata 1:2 - 91.28 M2


L. Kusen P5

Plesteran = (Volume Dinding Bata 1:2)x2


= (91,28)x2 182.56 M2
b Mengitung Dinding Bata 1 : 4

Tinggi = 3.90 M
Panjang = 75.43 M
Luas = (PxT)
= (75,43x3,9) 294.18 M2

Wc
Tinggi = 2.00 M
Panjang = 24.06 M
Luas = (PxT)
= (24,06x2) 48.12 M2

Volume Total = 294,18 + 48,12 342.30 M2

Volume Total = Volume Dinding Bata 1:4 - 277.13


M2
L.Total Kusen - L. Kusen P5

Plasteran = (Volume dinding1:4)x2 554.26


M2
= (277,13)x2

Volume Total Pekerjaan Dinding

V. Pas. Bata Total = Volume Dinding Bata 1:4 + 368.41


M2
Volume Dinding Bata 1:2

L.Plasteran Total = L.Plasteran Bata 1:4 + 736.82


M2
L.Plasteran Bata 1:2

Pengecetan 277,13x2 554.26 M2


VII PEKERJAAN TANGGA
GAMBAR :

137

79

185
a Anak Tangga
Lebar = 1.12 M
Tinggi = 0.2 M
Jumlah = 20 Unit
Alas = 0.3 M
Volume = 1/2 A x T x L x Unit
= 1/2 0,3 x 0,1 x 1,12 x 20 0.67 M3

b Plat Tangga
Lebar = 1.12 M
Panjang = 3.22 M
Tinggi = 0.09 M
Volume = PxLxT
= 3,22x1,12x0,9 0.32 M3

c Plat Bordes
Lebar = 0.97 M
Panjang = 2.37 M
Tinggi = 0.08 M 200
Volume = PxLxT
= 2,37x0,97x0,08 0.18 M3

d Balok Bordes 20/30

300
Lebar = 0.1 M
Panjang = 3.57 M
Tinggi = 0.15 M
Volume = PxLxT
= 3,57x0,1x0,15 0.05 M3
e Sloof 25/40
Lebar = 0.25 M
Panjang = 1.3 M
Tinggi = 0.40 M
Volume = PxLxT
= 1,3x0,25x0,40 0.13 M3

f Keramik
Anak Tangga
Panjang = 1.12 M
Lebar = 0.3 M
Jumlah = 20 Unit
Luas = PxLxJumlah
= 1,12x0,3x20 6.72 M2

Bordes
Panjang = 2.37
Lebar = 0.97
Luas = PxL
= 2,37x0,97 2.3 M2
VIII PEKERJAAN PAGAR BETON
NO PERHITUNGAN VOL SAT GAMBAR
a. Pekerjaan Pondasi menerus
1. Galian Tanah Pondasi Menerus
Panjang Horizontal = 25.5 M
Panjang Vertikal = 28.5 M
Total Panjang = 54 M
Tinggi =1 M
Lebar = 0.90 M
Volume = (P*L*T)
(54x0,90x1) 48.6 M3

2 Urungan Tanah Kembali


Volume = 3/4 x Volume Galian
Volume Galian Tanah = 48.6
36.45 M3
3 Pasir Alas Pondasi Menerus
Tinggi = 0.05 M
Lebar = 0.90 M
Panjang = 54 M
Volume = (P*L*T) 2.43 M3
= (54*0,90*0,05)

4 Aanstamping Pondasi Menerus


Tinggi = 0.15 M
Lebar = 0.90 M
Sloof S=25 / 40
Panjang = 54 M
Angker Ø 12 - 100
Volume = (P*L*T) 7.29 M3 80 Pond. Batu gunung
= (54*0,90*0,15)
Tanah Urug
5 Pas. Batu Gunung Pas. Batu Kosong
Tinggi = 0.8 M Pasir Alas
Lebar a = 0.35 M 15
Lebar b = 0.7 M 5
Panjang = 54 M 35
Volume = (( a + b )/2 x P x T )) 22.68 M3
((0,35+0,7)/2)x54x0,8 10 70 10
f Sloof 25/40
Tinggi = 0.4 M
Lebar = 0.25 M
Panjang = 54 M
Volume = (P*L*T) 5.40 M3
54x0,25x0,4
b Pekerjaan Beton Bertulang
1 Kolom KP 13/13
Tinggi = 5.15 M
Lebar = 0.13 M
Panjang = 0.13 M
Unit = 8 Unit
Volume = (PxLxT)xUnit
(0,13x0,13x5,15)x8 0.70 M3

c Pekerjaan Dinding
Mengitung Dinding Bata Transram 1 : 2

Tinggi = 0.50 M
Panjang = 52.92 M
Luas = PxT
= 52,92x0,50 26.46 M2

Plesteran = (Volume Dinding Bata 1:2)x2


= (26,46)x2 52.92 M2

2 Mengitung Dinding Bata 1 : 4


Tinggi = 5.15 M
Panjang = 52.92 M
Luas = (PxT)
= (52,92x5,15) 272.54 M2

Luas Plesteran = (Volume dinding1:4)x2


= (272,54)x2 545.08 M2

L.Plasteran Total = L.Plasteran Bata 1:4 + 299.00 M2


L.Plasteran Bata 1:2

Pengecetan 272,54x2 545.08 M2

d Ring Balok
Tinggi
Panjang
=
=
0.30
54
M
M
30 7Ø12

Lebar = 0.20 M
Volume =
=
(PxLxT)
54x0,20x0,3 3.24 M3 20
VIII PEKERJAAN PLAFOND
a Plafond Triplek 6mm
1 Teras
Teras Depan Elv. -0,05 (Bagian 1)
Lebar = 1.5 M
Panjang = 2.9 M
Volume = (PxL )
(2,9x1,50) 4.35 M2

Teras Belakang Elv. -0,05 (Bagian 2)


Lebar =2
Panjang = 4.87
Volume = (PxL )
(4,87x2,0) 9.74 M2

2 R.Tidur Elv. +0,05


Lebar = 4.37 M
Panjang = 5.37 M
Volume = (PxL)
(5,37x4,37) 23.47 M2

3 R.Tangga Lt-1 Elv. ± 0.00


Lebar = 1.12 M
Panjang = 2.37 M
Volume = (PxL)
= (2,37x1,12) 2.65 M2
4 R.Tamu Elv. ± 0.00
I
Lebar = 3.87 M
Panjang = 4.37 M
Volume = ( P x L)
= (4,37x3,87) 16.91 M2
II
Lebar = 0.5 M
Panjang = 1.87 M
Volume = (PxL)
= (1,87x0,5) 0.94 M2

Volume Total = 16,91 + 0,94 17.85 M2

5 Gudang Elv. +0.05


Lebar = 1.87 M
Panjang = 3.37 M
Volume = (PxL)
= (3,37x1,87x) 6.30 M2

6 R.Makan/R.Keluarga/Dapur Elv. ± 0.00


I
Lebar = 3.37 M
Panjang = 11.87 M
Volume = (PxL)
(11,87x3,37) 40.00 M2

II
Lebar = 1.37 M
Panjang = 2.63 M
Volume = (PxL)
(2,63x1,37) 3.60 M2

III
Lebar = 0.5 M
Panjang = 1.12 M
Volume = (PxL)
= (1,12x0,5x) 0.56 M2

Volume Total = 40 + 3,60 + 0,56 44.17 M2


7 Kamar Mandi
Kamar Mandi -0.05 (Bagian 1)
Lebar = 1.87 M
Panjang = 2.87 M
Volume = (PxL)
(2,87x1,87) 5.37 M2

Kamar Mandi -0.05 (Bagian 2)


Lebar = 1.87 M
Panjang = 1.87 M
Volume = (PxL )
(1,87x1,87) 3.50 M2

Kamar Mandi -0.05 (Bagian 3)


I
Lebar = 1.37 M
Panjang = 1.62 M
Volume = (PxL)
= (1,62x1,37) 2.22 M2
II
Lebar = 0.5 M
Panjang = 1.12 M
Volume = (PxL)
= (1,12x0,5) 0.56 M2

Volume Total = 2,22 + 0,56 2.78 M2

8 Garasi Elv.-0.05
I
Lebar = 4.87 M
Panjang = 5.37 M
Volume = ( P x L)
(5,37x4,87) 26.15 M2
II
Lebar = 0.5 M
Panjang = 0.87 M
Volume = (PxL)
(0,87x0,5) 0.44 M2

Volume Total = 26,15 +0,44 26.59 M2


9 R.Cuci Elv. -0.05
I
Lebar = 2.37 M
Panjang = 3.37 M
Volume = (PxL) M2
(3,37x2,37) 7.99 M2

II
Lebar = 1.37 M
Panjang =2 M
Volume = (PxL) M2
(2x1,37) 2.74 M2

Volume Total = 7,99 + 2,74 10.73 M2

10 Bag.Luar
I
Lebar =1 M
Panjang = 22 M
Volume = (PxL) M2
(22x1) 22.00 M2

L.Total Plafond = 1+2+3+4 179.48 M2


IX. PEKERJAAN PINTU,JENDELA,DAN VENTILASI
GAMBAR : P-3 J-3

P-3

P-4 P-4 P-4 P-4 J-4

P-5 V2

P-3

P-5
P-5
P-3
P-6

V1 P-3

P-3

J-4

J-1 J-1 P-1 J-1 J-1


J-1 J-1 P-1 J-1 J-1

NO PERHITUNGAN VOL SAT GAMBAR


1. Perhitungan Volume Kusen
a Kusen
Kusen Pintu P1
Tinggi = 0.06 M
Lebar = 0.13 M
Panjang = 7.06 M
Jumlah =1 Unit
Luas = (PxLxT)xUnit   
(7,06x0,13x0,06)x1 0.06 M3

Kusen Pintu P3
Tinggi = 0.06 M
Lebar = 0.13 M
Panjang = 6.16 M
  
Jumlah = 6 Unit DETAIL P1
DETAIL P 3

Luas = (PxLxT)xUnit
= (6,16x0,13x0,06)x6 0.29 M3

Kusen Pintu P4
Tinggi = 0.06 M
Lebar = 0.13 M
 
Panjang = 6.55 M 
Jumlah = 4 Unit
Luas = (PxLxT)xUnit
= (6,55x0,13x0,06)x4 0.20 M3

Kusen Pintu P5

Tinggi = 0.06 M  
DETAIL P 5
Lebar = 0.13 M DETAIL P 4

Panjang = 5.12 M
Jumlah = 3 Unit
Luas = (PxLxT)xUnit
= (3,73x0,13x0,06)x3 0.12 M3


Kusen Pintu Garasi
Tinggi = 0.06 M
Lebar = 0.13 M
Panjang = 8.98 M
Jumlah = 1 Unit

Luas = (PxLxT)xUnit
DETAIL P. Garasi
= (8,98x0,13x0,06)x1 0.07 M3
Kusen Jendela J1
Tinggi = 0.06 M
Lebar = 0.13 M
Panjang = 6 M
Jumlah = 4 Unit
Luas = (PxLxT)xUnit
= (6x0,13x0,06)x4 0.19 M3

Kusen Jendela J3
Tinggi
Lebar
=
=
0.06
0.13
M
M   
Panjang = 6.12 M
Jumlah = 1 Unit
Luas = (PxLxT)xUnit
= (6,12x0,13x0,06)x1 0.05 M3


Kusen Jendela J4 DETAIL J 1

Tinggi = 0.06 M DETAIL J 3
Lebar = 0.13 M
Panjang = 7.24 M
Jumlah = 2 Unit
Luas = (PxLxT)xUnit
= (7,24x0,13x0,06)x2 0.11 M3

 
Kusen Ventilasi V1
Tinggi = 0.06 M 
Lebar = 0.13 M
Panjang = 1.84 M DETAIL V 1
Jumlah = 1 Unit
Luas = (PxLxT)xUnit  
DETAIL J 4
= (1,84x0,13x0,06)x1 0.014 M 3
Kusen Ventilasi V2
Tinggi = 0.06 M
Lebar = 0.13 M
Panjang = 2.96 M 
Jumlah = 1 Unit
Luas = (PxLxT)xUnit
= (2,96x0,13x0,06)x1 0.02 M3

DETAIL V2
Total = 0,06+0,29+0,20+0,12+0,07+ 1.12 M3
0,19+0,11+0,014+0,02+0,05
b Daun Pintu
Daun Pintu P1 
Lebar = 2.31 M 
Panjang = 1.32 M    
Unit = 2 Unit  
Volume = (PxLx)xUnit
  
 
(1,32x2,31)x2 6.10 M2   

 
Daun Pintu P3  
Lebar = 2.11 M  
Panjang = 0.82 M
=
    
Unit 6 Unit
Volume = (PxL)xUnit
 
(0,82x2,11)x6 10.38 M2

Daun Pintu P5 
 
Lebar = 2.16 M
Panjang = 0.7 M  
Unit = 3 Unit
    
 

Volume = (PxL)xUnit    
(0,7x2,16)x3 4.54 M2         

Ambang Daun Pintu P4   
Lebar = 0.06 M
Panjang = 6.36 M
Unit = 8 Unit
Volume = (PxL)xUnit
(6,36x0,06)x8 3.05 M2
Daun Pintu Garasi
Lebar = 2.51 M
Panjang = 0.5 M
Unit = 8 Unit 
Volume = (PxL)xUnit  
(0,5x2,51)x8 10.04 M2

c Ambang Daun Jendela


Daun Jendela J1
Lebar = 0.08 M
Panjang = 4.68 M
Unit = 4 Unit
Volume = (PxLx)xUnit
       
(4,68x0.08)x4 1.50 M2

Daun Jendela J3
Lebar = 0.08 M
Panjang = 3.64 M
Unit = 2 Unit
Volume = (PxLx)xUnit
(3,64x0.08)x2 0.58 M2
 
 

       

  


Daun Jendela J4 
Lebar = 0.08 M
Panjang = 3.68 M     
Unit = 6 Unit
Volume = (PxLx)xUnit 
(3,68x0.08)x6 1.77 M2

d Ambang Daun Ventilasi
Daun Ventilasi P1  
Lebar = 0.09 M
Panjang = 2.10 M   
Unit = 1 Unit 
Volume = (PxLx)xUnit
(2,10x0.09)x1 0.19 M2

 
Daun Ventilasi J1
Lebar
Panjang
=
=
0.09
1.88
M
M
 
Unit = 4 Unit  
Volume = (PxLx)xUnit
(1,89x0.09)x4 0.68 M2  



e Ventilasi Pintu
Pintu Garasi

Tinggi = 0.42 M
Lebar = 0.31 M   
Panjang = 0.13 M    
Jumlah = 8 Unit
Luas = (PxLxT)xUnit
= (0,13x0,31x0,42)x8 0.14 M3 
Papan Ventilasi P3
Tinggi = 0.42 M
Lebar = 0.01 M
Panjang = 0.15 M 
Unit = 10 Unit       
Volume = (PxLxT)xUnit
(0,15x0,01x0,42)x10 0.01 M3

d Kaca
  
Kaca Jendela J1 
Lebar = 1.64 M    
Panjang = 0.36 M
Unit = 4 Unit
Volume = (PxL)xUnit
(0,36x1,64)x10 2.36 M2

Kaca Ventilasi J1
Lebar = 0.24 M
Panjang = 0.36 M
Unit = 4 Unit
Volume = (PxL)xUnit
(0,36x0.24)x4 0.35 M2
Kaca Jendela J3
Lebar = 1.15 M
Panjang = 0.36 M
Unit = 2 Unit
Volume = (PxL)xUnit
(0,36x1,15)x2 0.83 M2

Kaca Ventilasi J3 
Lebar = 0.4 M  
Panjang = 0.52 M
Unit = 2 Unit  
Volume = (PxL)xUnit
(0,52x0.4)x2 0.42 M2  
Kaca Jendela J4
Lebar = 1.15 M
Panjang = 0.36 M
Unit = 6 Unit
Volume = (PxL)xUnit
  
(0,36x1,15)x6 2.48 M2

 

Kaca Ventilasi J4     
Lebar = 0.4 M 
Panjang = 0.54 M        
Unit = 6 Unit
Volume = (PxL)xUnit
(0,54x0.4)x6 1.30 M2

Kaca Ventilasi P1
Lebar = 0.24 M
Panjang = 0.46 M
Unit = 2 Unit
Volume = (PxL)xUnit
(0,46x0.24)x2 0.22 M2
Kaca P4
Lebar = 0.35 M
Panjang = 2.49 M
Unit = 8 Unit
Volume = (PxL)xUnit
(2,49x0,35)x8 6.97 M2 
 
Kaca Ventilasi V1
Lebar = 0.2 M  
Panjang = 0.52 M
 
Unit = 1 Unit
Volume = (PxL)xUnit
(0,52x0.2)x1 0.10 M2

Kaca Ventilasi V2
Lebar = 0.2 M
Panjang
Unit
=
=
0.52
2
M
Unit
  
Volume = (PxL)xUnit
(0,52x0.2)x4 0.21 M2

Pengecatan Kusen


P1 = (0,13+0,06)x7,06x1 1.34 M2
P3 = (0,13+0,06)x6,16x6 7.02 M2

P4 = (0,13+0,06)x6,55x4 4.98 M2
P5 = (0,13+0,06)x5,12x3 2.92 M2
P.Garasi = (0,13+0,06)x0,5x8 0.76 M2       
J1 = (0,13+0,06)x6x4 4.56 M2
J3 = (0,13+0,06)x6,12x1 1.16 M2

J4 = (0,13+0,06)x7,24x2 2.75 M2
V1 = (0,13+0,06)x1,84x1 0.35 M2
V2 = (0,13+0,06)x2,96x1 0.55 M2
Total = 2,18+3,77+12,58+12,26 26.40 M2
IV. PEKERJAAN ATAP
GAMBAR :

11.00 5.00 11.00 5.00


4.50 3.00 4.50 3.00

1.50 1.50

5.50 5.50

8.5012.00 12.00 8.5012.00


12.00

4.50 4.50

2.00 2.00 2.00 2.00

.50

2.50 1.50 7.00 5.00


Skala. 1 : 100 2.50 1.50 7.00 5.00
NO PERHITUNGAN VOL SAT GAMBAR
1. Pekerjaan Kuda-Kuda
a KD-4
a Balok Tarik
Tinggi = 0.12 M
Lebar = 0.05 M
Panjang = 7.11 M
Unit =2 Unit
Volume = (PxLxT)xUnit
(0,12x0,05x7,11)x2 0.09 M3

b Kaki Kuda-Kuda
Tinggi = 0.12 M
Rabung
Lebar = 0.06 M Nok 5/10
Makelar 6/12
Panjang = 4.99 M Kasau 5/7
Unit = 2 Unit Kaki Kuda-Kuda 6/12
Gapit 2x4/12
Volume = (PxLxT)xUnit 84 Gording 5/10
Tupai-Tupai
(0,12x0,06x4,99)x2 0.07 M3 100
532 Skord Miring 6/12
516 Gapit 2x4/12
100 Skord Tegak 6/12
Atap Seng
c Makelar 100 Balok Tarik 2x5/12
Tinggi = 0.12 M 100
Lebar = 0.06 M
Panjang = 2.1 M
BAUT Ø5/8"
Unit = 1 Unit Ring Balok 20/30 PLAFFOND TRIPLEK 6mm

Volume = (PxLxT)xUnit
(0,12x0,06x2,10)x1 0.02 M3 650

d Balok Gapit
Tinggi = 0.12 M
Lebar = 0.04 M
Panjang = 4.06 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,04x4,06)x2 0.04 M3

e Sokong Miring
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 1.66 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x1,66)x2 0.02 M3
f Sokong Tegak
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 1.07 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x1,07)x2 0.02 M3

Volume Total = (Jlh. Volume Total) x Unit 0.51


M3
(a+b+c+d+e) x 2

b KD-4 1/2
a Balok Tarik
Tinggi = 0.12 M
Lebar = 0.05 M
Panjang = 3.67 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,05x3,67)x2 0.04 M3

b Kaki Kuda-Kuda
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 5.14 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x5,14)x1 0.04 M3

c Balok Gapit
Tinggi = 0.12 M
Lebar = 0.04 M
Panjang = 2.32 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,04x2,32)x2 0.02 M3
d Sokong Miring
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 1.84 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x1,84)x1 0.01 M3

e Sokong Tegak
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 1.17 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x1,17)x2 0.01 M3

Volume Total = (Jlh. Volume Total) x Unit 0.25


M3
(a+b+c+d+e) x 1

VOLUME TOTAL KUDA-KUDA

Volume Total = KD-4 + KD 4 1/2 0.76


M3

c Ikatan Angin

a Tinggi = 0.12 M
Lebar = 0.04 M
Panjang = 2.06 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x2,06)x2 0.02 M3
2. RANGKA ATAP
A Gording

a Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 5.88 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x5,88)x1 0.03 M3

b Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 4.88 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x4,88)x1 0.02 M3

c Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 3.88 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x3,88)x1 0.02 M3

d Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 2.88 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x2,88)x2 0.03 M3

e Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 1.88 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x1,88)x3 0.03 M3
f Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 8.26 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x8,26)x1 0.04 M3

g Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 6.26 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x6,26)x1 0.03 M3

h Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 4.26 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x4,26)x1 0.02 M3

i Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 2.26 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x2,26)x1 0.01 M3

j Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 2.82 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x2,82)x4 0.06 M3
k Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 1.32 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x1,32)x3 0.02 M3

l Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 0.88 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x0,88)x1 0.004 M3

Volume Total = a+b+c+d+e+f+g+h+i+j+k+l+ 0.32


M3

B Kasau
1 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 4.2 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x4,2)x4 0.06 M3

2 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 3.89 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x3,89)x3 0.04 M3

3 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 3.39 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x3,39)x3 0.04 M3
4 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.89 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,89)x4 0.04 M3

5 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 3.89 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x3,89)x3 0.04 M3

6 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 3.39 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x3,39)x3 0.04 M3

7 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.89 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,89)x4 0.04 M3
8 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.39 M
Unit = 5 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,39)x5 0.04 M3

9 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.89 M
Unit = 5 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,89)x5 0.03 M3

10 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.39 M
Unit = 5 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,39)x5 0.02 M3
11 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.89 M
Unit = 6 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,89)x6 0.02 M3

12 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.39 M
Unit = 6 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,39)x6 0.01 M3

13 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.82 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,82)x3 0.03 M3

14 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.63 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,63)x4 0.009 M3

15 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.13 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,13)x1 0.007 M3
16 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.63 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,63)x1 0.006 M3

17 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.13 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,13)x1 0.004 M3

18 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.32 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,32)x4 0.018 M3

19 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.92 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,92)x1 0.003 M3

20 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.42 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,42)x1 0.001 M3

Volume Total = No. 1+2+3+4+5+6+7+8+9+


11+12+13+14+15+16+17+18+ 0.50 M3
19+20
C Penutup Atap Seng Spandek

1 Lebar = 5.5 M
Panjang = 8.5 M
Volume = (PxL)
(8,5x5,5) 46.75 M2

2 Lebar = 5.32 M
Panjang =6 M
Volume = (PxL)
(6x5,32) 31.92 M2

3 Lebar = 5.32 M
Panjang =3 M
Volume = (PxL)
(3x5,32) 15.96 M2

4 Lebar = 3.23 M
Panjang = 1.5 M
Volume = (PxL)
(1,5x3,23) 4.85 M2

5 Lebar = 3.23 M
Panjang =3 M
Volume = (PxL)
(3x3,23) 9.69 M2

Volume Total = No. (1+2+3+4) 109.17


M2
D Lisplank

Panjang = 22 M
Jumlah =2 Unit
Total = (P x Unit) 44
M
(22 x 2)

E Rabung

Panjang = 2.82 2.82 M

F Jurai Luar

Panjang = 13.67 13.67 M

G Jurai Dalam

Panjang = 4.24 4.24 M


NO LANTAI 2
I. DENAH LANTAI II
GAMBAR :
A
17.00
3.50 8.50 3.00 2.00

2.00

4.50 8.00

2.00

1.50
3.50 R .TIDUR
+ 0.00

2.00
KM/WC

22.00 - 0.05

.20
.97
2.37 4.50
B 5.50 B
KM/WC
- 0.05

R.TIDUR
+ 0.00 2.00

1.37 2.90TERAS 1.50


- 0.05

7.50
6.50
A 4.00

5.00 5.00 7.00

II. DENAH BALOK DAN PLAT LANTAI

3.37 4.87
1.87 1.87 20/30 20/30

3.37 3.851.87
12 Ø 100

1 2 Ø 15

1 2 Ø 15

1 2 Ø 15
1 2 Ø 15

1 2 Ø 15

1 2 Ø 15
20/30

3.37 3.37
20/30

20/30
12 Ø100

20/30
2.39
20/30
12 Ø 15
12 Ø 15

12 Ø 15

20/30
20/30
12 Ø 15
1.87
5.37
12 Ø 15

1.87
1.87
20/30

12 Ø 15

20/30
20/30

20/30

20/30
12 Ø 15
12 Ø 15

12 Ø 15
NO PERHITUNGAN VOL SAT GAMBAR
1 PLAT LANTAI
a Pias I
Tinggi = 0.12 M
Panjang = 5.37 M
Lebar = 3.37 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (3,37x5,37x0,12)x1 2.17 M3

b Pias II
Tinggi = 0.12 M
Panjang = 3.37 M
Lebar = 3.37 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (3,37x3,37x0,12)x1 1.36 M3

c Pias III
Tinggi = 0.12 M
Panjang = 1.87 M
Lebar = 3.37 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (1,87x3,37x0,12)x1 0.76 M3

d Pias IV
Tinggi = 0.12 M
Panjang = 1.87 M
Lebar = 4.87 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (1,87x4,87x0,12)x1 1.09 M3

e Pias V
Tinggi = 0.12 M
Panjang = 1.87 M
Lebar = 3.85 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (1,87x3,85x0,12)x1 0.86 M3

f Pias VI
Tinggi = 0.12 M
Panjang = 1.87 M
Lebar = 1.87 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (1,87x1,87x0,12)x1 0.42 M3

g Pias VII
Tinggi = 0.12 M
Panjang = 0.85 M
Lebar = 1.37 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (0,85x1,37x0,12)x1 0.14 M3

h Pias VIII
Tinggi = 0.12 M
Panjang = 3.37 M
Lebar = 2.39 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (3,37x2,39x0,12)x1 0.97 M3

i Pias IX
Tinggi = 0.12 M
Panjang = 2.50 M
Lebar = 2.37 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (2,50x2,37x0,12)x1 0.71 M3

j Pias X
Tinggi = 0.12 M
Panjang = 1.37 M
Lebar = 3.98 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (1,37x3,98x0,12)x1 0.65 M3
k Pias XI
Tinggi = 0.12 M
Panjang = 2.50 M
Lebar = 1.87 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (2,50x1,87x0,12)x1 0.56 M3

l Pias XII
1 Tinggi = 0.12 M
Panjang = 1.87 M
Lebar = 1.87 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (1,87x1,87x0,12)x1 0.42 M3

2 Tinggi = 0.12 M
Panjang = 0.50 M
Lebar = 1.37 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (0,50x1,37x0,12)x1 0.08 M3

Total = 0,42 + 0,08 0.50 M3


m Pias XIV
1 Tinggi = 0.12 M
Panjang = 3.87 M
Lebar = 2.50 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (3,87x2,50x0,12)x1 1.16 M3

2 Tinggi = 0.12 M
Panjang = 0.50 M
Lebar = 2.37 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (0,50x2,37x0,12)x1 0.14 M3

Total = 1,16+ 0,14 1.30 M3


n Pias XV
Tinggi = 0.12 M
Panjang = 1.37 M
Lebar = 2.90 M
Banyak Pias I (U) = 1
Volume = (PxLxT)xU
= (1,37x2,90x0,12)x1 0.48 M3

V.Total = a+b+c+d+e+f+g+h+i+j+k+l+ 11.98 M3


m+n

2 BALOK LANTAI
a Balok Lantai 20/30
Tinggi = 0.3 M
Panjang = 89.53 M
Lebar = 0.20 M

Volume = (PxLxT)
= 89,53x0,20x0,30 5.37 M3

NO PERHITUNGAN VOL SAT GAMBAR


2 Keramik
a Keramik 40 x 40
1 Teras Elv. +4.00
Lebar = 2.9 M
Panjang = 1.37 M 3.50 8.50 3.00
Volume = (PxL )
(2,9x1,37) 3.97 M2 2.00
4.50

2 Balkon
4.50
Belakang Elv. +4.05 2.00
Lebar = 8.63 M
Panjang =2 M 1.50
Volume = (PxL )
3.50 R.TIDUR
+ 0.00
(2x8,63) 17.26 M 2
18.00 2.00

Samping Elv. +4.10 KM/WC


- 0.05

Lebar = 3.34 M
Panjang = 5.37 M 4.50
Volume = (PxL ) 5.50
KM/WC

(5,37x3,34) 17.94 M 2 - 0.05

3 Kamar Tidur
R.TIDUR
+ 0.00 2.00
K.Tidur 1
2.50
Lebar = 3.37 M TERAS 1.50
- 0.05
Panjang = 3.37 M
Volume = (PxL )
(3,37x3,37) 11.36 M2 5.00 5.00
K.Tidur 2
I
Lebar = 4.37 M
Panjang = 3.87 M
Volume = (PxL )
(3,87x4,37) 16.91 M2

II
Lebar = 0.5 M
Panjang = 2.37 M
Volume = (PxL )
(2,37x0,50) 1.19 M2

Volume Total = 16,91 + 1,19 18.10 M2

4 Ruang Santai
I
Lebar = 6.37 M
Panjang = 3.37 M
Volume = (PxL )
(3,37x6,37) 21.47 M2

II
Lebar = 1.87 M
Panjang = 2.5 M
Volume = (PxL )
(2,5x1,87) 4.68 M2

Volume Total = 21,47 + 4,68 26.14 M2


L.Total Keramik = 1 + 2 + 3+ 4 94.8 M2

b Keramik 30x30
WC 1
Lebar = 1.87 M
Panjang = 1.87 M
Luas = (PxL)
= (1,87x1,87) 3.5 M2

WC 2
I
Lebar = 1.87 M
Panjang = 1.87 M
Luas = (PxL)
= (1,87x1,87) 3.5 M2

II
Lebar = 1.37 M
Panjang = 0.5 M
Luas = (PxL)
= (0,5x1,37) 0.7 M2

Volume Total = 3,5 + 0,7 4.18 M2

L.Total Keramik 30x30 = WC 1 + WC 2 7.68 M2


III. DENAH KOLOM LANTAI 2
GAMBAR :
8.50
KI
KP KP KI KI

KP
KI
KP KP KP

KP

KI KP KP KP
11.0

KP KP KI KI
KI

KP
KP
KP
KP KI
KI KP KI

KP
KI KI

3. PEKERJAAN BETON BERTULANG


a Kolom Praktis KP 13/13
1 Tinggi = 3.41 M
Lebar = 0.13 M
Panjang = 0.13 M
Unit = 23 Unit
Volume = (PxLxT)xUnit
(0,13x0,13x3,41)x22 1.33 M3

2 Tinggi = 1.67 M
Lebar = 0.13 M
Panjang = 0.13 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,13x0,13x1,67)x1 0.03 M3

Volume Total = 1,33 + 0,03 1.35 M3

b Kolom KI 20/20
1 Tinggi = 3.41 M
Lebar = 0.2 M
Panjang = 0.2 M
Unit = 11 Unit
Volume = (PxLxT)xUnit
(0,2x0,2x3,41)x13 1.50 M3

2 Tinggi = 1.67 M
Lebar = 0.2 M
Panjang = 0.2 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,2x0,2x1,67)x2 0.13 M3

Volume Total = 1,5+ 0,13 1.63 M3


V. PEKERJAAN DINDING
NO PERHITUNGAN VOL SAT GAMBAR
1. Luas kusen
a Kusen
Kusen Pintu P2
Tinggi = 2.33 M
Lebar = 1.42 M
Jumlah =1 Unit
Luas = (LxT)xUnit
(1,42x2,33)x1 3.31 M2
 
Kusen Pintu PJ 
Pintu
Tinggi = 2.33 M
Lebar = 0.93 M
Jumlah = 1 Unit
Luas = (LxT)xUnit
= (0,93x2,633)x1 2.17 M2

Jendela 
DETAIL P 3
Tinggi = 1.92 M
Lebar = 0.56 M
Jumlah = 2 Unit
Luas = (LxT)xUnit
= (0,56x1,92)x2 2.15 M2

PJ Total = 2,17 + 2,15 4.32 M2

Kusen Pintu P3
Tinggi = 2.62 M  
Lebar = 0.92 M 
Jumlah = 2 Unit
Luas = (LxT)xUnit
= (0,92x2,62)x2 4.82 M2
Kusen Pintu P5
Tinggi = 2.16 M
 
Lebar = 0.8 M
Jumlah = 2 Unit 
Luas = (LxT)xUnit
= (0,80x2,16)x2 3.46 M 2

Kusen Jendela J2
Tinggi = 1.92 M
Lebar = 0.62 M
Jumlah = 6 Unit
Luas = (LxT)xUnit
= (0,62x1,92)x6 7.14 M2  
Kusen Jendela J3  
Tinggi = 1.88 M
Lebar = 1.18 M
Jumlah = 1 Unit
Luas = (LxT)xUnit
= (1,18x1,88)x1 2.22 M2

Kusen Ventilasi V1
Tinggi = 0.3 M 
Lebar = 0.62 M 
Jumlah = 1 Unit DETAIL P 5
Luas = (LxT)xUnit 
= (0,62x0,38)x1 0.19 M2

Kusen Ventilasi V2
Tinggi = 0.3 M DETAIL V2
Lebar = 1.18 M 
Jumlah = 1 Unit
Luas = (LxT)xUnit
=
  
(1,18x0,3)x1 0.35 M2
DETAIL V1
Total Luas Kusen = P2+PJ+P3+P5+J2+J3+V1+V2 25.80 M2

b Mengitung Dinding Bata Transram 1 : 2


1 Dinding Trasram 1 : 2 ( D : Wc)
Tinggi = 1.9 M
Panjang = 13.96 M 
Volume = PxT DETAIL J3
= 13,96x1,9 26.52 M2

Volume Total = Volume Dinding Bata 1:2 - 23.07 M2


L. Kusen P5

Plesteran = (Volume Dinding Bata 1:2)x2


= (23,07)x2 46.14 M2
1.9

b Mengitung Dinding Bata 1 : 4

Tinggi = 3.50 M
Panjang = 43.49 M NOK 5/10
Luas = (PxT) TIANG KUDA-KUDA 6/12
NOK 5/10
TIANG KUDA-KUDA 6/12
= (43,49x3,5) 152.22 M 2
KAKI KUDA-KUDA 6/12
IKATAN ANGN 4/12
KASAU 5/7
TIANG KUDA-KUDA 6/12
Wc GORDING 5/10
KAKI KUDA-KUDA 6/12
Tinggi = 1.60 M
Panjang = 13.96 M
Luas = (PxT) Pas. Bata 1:4
= (13,96x1,6) 22.34 M2
1.80
Atas Ringbalok
Tinggi = 1.67 M
Panjang = 5.21 M Pas. Bata 1:4 Pas. Bata
Luas = (PxT)
= (5,216x1,67) 8.70 M2
3.50

Balkon Samping
+4.05 + 4.10
Tinggi = 0.80 M
Panjang = 3.33 M
Luas = (PxT)
= (3,33x0,80) M2 20/30 20/30
2.66

Total = 152,22+22,34+8,70+2,66 185.92 M2

3.50
Volume Total = Volume Dinding Bata 1:4 - 156.66
M2
L.Total Kusen - L. Kusen P5

Plasteran = (Volume dinding1:4)x2 313.31


M2
= (156,66)x2

Volume Total Pekerjaan Dinding


3.50
V. Pas. Bata Total = Volume Dinding Bata 1:4 + 179.72
M2
Volume Dinding Bata 1:2

L.Plasteran Total = L.Plasteran Bata 1:4 + 359.45


M2
L.Plasteran Bata 1:2

Pengecetan (156,66+26,52)x2 359.45 M2


V. RING BALOK

1 5 /2 0
1 5 /2 0
15/20 15/20

15/20 15/20

1 5 /2 0

1 5 /2 0
1 5 /2 0

1 5 /2 0
15/20

1 5 /2 0
15/20
11.0

1 5 /2 0
15/20
15/20

1 5 /2 0

1 5 /2 0
15/20

10.0
NO PERHITUNGAN VOL SAT GAMBAR
1. Menghitung Ring Balok
Ø6-10

20
Balok Lantai 15/20
Tinggi = 0.2 M 7Ø12
Panjang = 89.53 M
Lebar = 0.20 M
Volume = (PxLxT)
= (89,53x0,13x0,2) 3.58 M3

IV. PEKERJAAN KUSEN ,DAUN PINTU & JENDELA, KACA


GAMBAR :

PJ1 J-2 J-2

J-3

P-3

PJ1

P-5

J-5

J-6

P-5

P-3

J-2 J-2 P-2 J-2 J-2

NO PERHITUNGAN VOL SAT GAMBAR


1. Perhitungan Volume Kusen
a Kusen
Kusen Pintu P2
Tinggi = 0.06 M
Lebar = 0.13 M
Panjang = 7.50 M
Jumlah =1 Unit
Luas = (PxLxT)xUnit
(7,5x0,13x0,06)x1 0.06 M3

 
Kusen Pintu PJ 
Tinggi = 0.06 M
Lebar = 0.13 M
Panjang = 8.76 M
Jumlah = 1 Unit
Luas = (PxLxT)xUnit
(8,76x0,13x0,06)x1 0.07 M3


Kusen Pintu P3 DETAIL P 3
Tinggi = 0.06 M
Lebar = 0.13 M
Panjang = 7.08 M
Jumlah = 2 Unit
Luas = (PxLxT)xUnit
= (7,08x0,13x0,06)x2 0.11 M3

 
Kusen Pintu P5

 
Tinggi = 0.06 M 
Lebar = 0.13 M
Panjang = 5.92 M
Jumlah = 2 Unit
Luas = (PxLxT)xUnit
= (5,92x0,13x0,06)x2 0.09 M3

 

Kusen Jendela J2
Tinggi = 0.06 M
Lebar = 0.13 M
Panjang = 5 M
Jumlah = 6 Unit
Luas = (PxLxT)xUnit
= (5x0,13x0,06)x6 0.24 M3

Kusen Jendela J3    
Tinggi = 0.06 M
Lebar = 0.13 M
Panjang = 4.96 M
Jumlah = 1 Unit
Luas = (PxLxT)xUnit
= (4,96x0,13x0,06)x1 0.04 M3

 
DETAIL P 5
Kusen Ventilasi V1
Tinggi = 0.06 M 
Lebar = 0.13 M
Panjang = 1.84 M
Jumlah = 1 Unit

Luas = (PxLxT)xUnit
DETAIL V2
= (1,84x0,13x0,06)x1 0.014 M3 
 
Kusen Ventilasi V2 
Tinggi = 0.06 M
Lebar = 0.13 M DETAIL V1
Panjang = 2.96 M
Jumlah = 1 Unit
Luas = (PxLxT)xUnit
= (2,96x0,13x0,06)x1 0.02 M3

Total = 0,06+0,29+0,11+0,09+0,24+ 0.64 M3 DETAIL J 3
0,04+0,14+0,02
b Daun Pintu Dan Ambang Daun Jendela 
Daun Pintu P2  

Lebar = 0.66 M
Panjang = 2.28 M
Jumlah =2 Unit

Luas = (PxL)xUnit
(2,28x0,66x)x2 3.01 M 2

   
Daun Pintu Dan Ambang Jendela PJ
Pintu
Lebar = 0.83 M
Panjang = 2.28 M 
Jumlah =1 Unit
Luas = (PxL)xUnit
(2,28x0,83)x1 1.89 M2  

Jendela     


Lebar = 0.52 M 
Panjang = 1.82 M      
Jumlah = 2 Unit
Luas = (PxL)xUnit   
(1,82x0,52)x2 1.89 M2

Daun Pintu P3
Lebar = 0.82 M  
Panjang = 2.11 M  
Jumlah = 2 Unit
 
Luas = (PxL)xUnit   
= (2,11x0,82)x2 3.46 M2


Daun Pintu P5
Lebar = 0.7 M 
Panjang = 2.11 M

Jumlah = 2 Unit
Luas = (PxL)xUnit  
= (2,11x0,7)x2 2.95 M2
      

          
Ambang Daun Jendela J2 
Lebar = 0.08 M 
Panjang = 5 M  
Jumlah = 6 Unit
Luas = (PxL)xUnit
  
= (5x0,08)x6 2.25 M 2
 

 

Ambang Daun Jendela J3
Lebar = 0.08 M 
Panjang = 3.68 M
Jumlah = 2 Unit 
Luas = (PxL)xUnit
= (3,68x0,08)x2 0.59 M 2
    
Papan Ventilasi P3
Tinggi = 0.42 M 
Lebar = 0.01 M
Panjang = 0.15 M 
Unit = 20 Unit
Volume = (PxLxT)xUnit
(0,15x0,01x0,42)x20  
0.013 M3
c Kaca
Kaca Jendela PJ           
Lebar = 0.34 M  
Panjang = 1.64 M   
Jumlah = 2 Unit
 
Luas = (PxL)xUnit
= (1,64x0,34)x2 1.12 M 2   

Kaca Jendela J2     


Lebar = 0.36 M
Panjang = 1.64 M 
Jumlah = 6 Unit    
Luas = (PxL)xUnit
= (1,64x0,36)x6 3.54 M2


Kaca Jendela J3
 
Lebar = 0.36 M
=  
Panjang 1.15 M
Jumlah = 2 Unit   
Luas = (PxL)xUnit    
= (0,36x1,15)x2 0.83 M2 
    
Kaca Ventilasi V1
Lebar = 0.2 M  
Panjang = 0.52 M  
Unit = 1 Unit
Volume = (PxL)xUnit  
(0,52x0.2)x1 0.10 M2

Kaca Ventilasi V2 
Lebar = 0.2 M
  
Panjang = 0.52 M
Unit = 2 Unit
Volume = (PxL)xUnit 
(0,52x0.2)x4 0.21 M2
 
  

    
 
       


    

V. PEKERJAAN PLAFOND
A Plafond Triplek 6mm
1 Teras Elv. +4.00
Lebar = 2.9 M
Panjang = 1.37 M
Volume = (PxL )
(2,9x1,37) 3.97 M2

2 Kamar Tidur
K.Tidur 1
Lebar = 3.37 M
Panjang = 3.37 M
Volume = (PxL )
(3,37x3,37) 11.36 M2

K.Tidur 2
I
Lebar = 4.37 M
Panjang = 3.87 M
Volume = (PxL )
(3,87x4,37) 16.91 M2

II
Lebar = 0.5 M
Panjang = 2.37 M
Volume = (PxL )
(2,37x0,50) 1.19 M2

Volume Total = 16,91 + 1,19 18.10 M2

3 Ruang Santai
I
Lebar = 6.37 M
Panjang = 3.37 M
Volume = (PxL )
(3,37x6,37) 21.47 M2

II
Lebar = 1.87 M
Panjang = 2.5 M
Volume = (PxL )
(2,5x1,87) 4.68 M2

Volume Total = 21,47 + 4,68 26.14 M2

4 WC 1
Lebar = 1.87 M
Panjang = 1.87 M
Luas = (PxL)
= (1,87x1,87) 3.5 M2

5 WC 2
I
Lebar = 1.87 M
Panjang = 1.87 M
Luas = (PxL)
= (1,87x1,87) 3.5 M2

II
Lebar = 1.37 M
Panjang = 0.5 M
Luas = (PxL)
= (0,5x1,37) 0.7 M2
Volume Total = 3,5 + 0,7 4.18 M2
6 Bag.Luar
Lebar = 1 M
Panjang = 46.01 M
Luas = (PxL)
= (1,87x1,87) 46.0 M2

L.Total Plafond = (1+2+3+4+5+6) 113.26 M2

IV. PEKERJAAN ATAP


GAMBAR :

11.00 5.00
4.50 3.00 11.00 5.00
4.50 3.00

1.50
1.50
5.50
5.50

12.00 8.5012.00
12.00 8.5012.00

4.50
4.50

2.00 2.00
2.00 2.00

.50

Skala. 1 : 100 2.50 1.50 7.00 5.00 2.50 1.50 7.00 5.00

NO PERHITUNGAN VOL SAT GAMBAR


1. KUDA-KUDA
A KD-1
a Balok Tarik
Tinggi = 0.12 M
Lebar = 0.05 M
Panjang = 4.11 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,05x4,11)x2 0.05 M3

b Kaki Kuda-Kuda
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 3.26 M
Unit =2 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x3,26)x2 0.05 M3
Rabung
c Makelar Makelar 6/12
Tinggi = 0.12 M Kaki Kuda-Kuda 6/12
Lebar = 0.06 M Kasau 5/7
23
Panjang = 1.24 M Skord Miring 6/12
Unit = 1 Unit 100 Gapit 2x4/12 Atap Seng
328 Balok Tarik 2x5/12
Volume = (PxLxT)xUnit 345
(0,12x0,06x1,24)x1 0.01 M3 100 Gording 5/10
124 326 Tupai-Tupai
d Balok Gapit 78 254
100
Tinggi = 0.12 M
Lebar = 0.04 M
Panjang = 2.54 M BAUT Ø5/8"

411 PLAFFOND TRIPLEK 6mm

Unit = 2 Unit
Volume = (PxLxT)xUnit Ring Balok 15/20
(0,12x0,04x2,54)x2 0.02 M3 100 350 100

e Sokong Miring
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 0.78 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x0,78)x2 0.01 M3

Volume Total = (Jlh. Volume Total) x Unit 0.70


M3
(a+b+c+d+e) x 5

B KD-2
a Balok Tarik
Tinggi = 0.16 M
Lebar = 0.05 M
Panjang = 7.21 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,16x0,05x7,21)x2 0.12 M3
RABUNG
NOK 5 /1 0
TIANG KUDA-KUDA 1 4 /1 4
KASAU 5 /7
KAKI KUDA-KUDA 6 /1 4
GAPIT 2 x4 /1 2
79 SKORD MIRING 6 /1 2
GAPIT 2 x 4 /1 2
b Kaki Kuda-Kuda 100 BAUT Ø1 2 mm
519
Tinggi = 0.14 M 499 SKORD TEGAK 6 /1 2
Lebar = 0.06 M 100 GORDING 5 /1 0
TUPAI-TUPAI
Panjang = 4.99 M 499 ATAP GENTENG METAL
100 3 0 02 1 3 BALOK TARIK 2 x 5 /1 6
Unit = 2 Unit 1 3125 2
Volume = (PxLxT)xUnit 100 RING BALOK 1 5 /2 5
D-2
86 119
(0,14x0,06x4,99)x2 0.08 M3 195
D-1

c Makelar
Tinggi = 0.14 M 60 60 60
Lebar = 0.14 M 226 268 226
721
Panjang = 2.13 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,14x0,14x1,24)x1 0.04 M3

d Balok Gapit (Bag.1)


Tinggi = 0.12 M
Lebar = 0.04 M
Panjang = 1.95 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,12x0,04x1,95)x4 0.04 M3

Balok Gapit (Bag.2)


Tinggi = 0.12 M
Lebar = 0.04 M
Panjang = 2.13 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,04x2,13)x2 0.02 M3

e Sokong Miring (Bag.1)


Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 1.19 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x1,19)x2 0.02 M3

Sokong Miring (Bag.2)


Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 1.32 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x1,32)x2 0.02 M3

f Sokong Tegak (Bag.1)


Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 0.86 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x0,86)x2 0.01 M3

Sokong Tegak (Bag.2)


Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 1.52 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x1,52)x2 0.02 M3

Volume Total = (Jlh. Volume Total) x Unit 0.74


M3
(a+b+c+d+e+f) x 2

C KD-2 1/2
a Balok Tarik
Tinggi = 0.16 M
Lebar = 0.05 M
Panjang = 3.7 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,16x0,05x3,7)x2 0.06 M3

b Kaki Kuda-Kuda
TIANG KUDA-KUDA 6/12
Tinggi = 0.14 M
Lebar = 0.06 M KAKI KUDA-KUDA 6/12
Panjang = 5.28 M KASAU 5/7
Unit = 1 Unit GORDING 5/10
Volume = (PxLxT)xUnit
(0,14x0,06x5,28)x1 0.04 M3

c Balok Gapit 1.87


Tinggi = 0.12 M
Lebar = 0.04 M
Panjang = 2.31 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,04x2,31)x2 0.02 M3

d Sokong Miring
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 1.82 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x1,82)x2 0.01 M3

e Sokong Tegak
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 1.06 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x1,06)x1 0.01 M3

Volume Total = (Jlh. Volume Total) x Unit 0.15


M3
(a+b+c+d+e) x 1

D KD-3
a Balok Tarik
Tinggi = 0.12 M
Lebar = 0.05 M
Panjang = 5.61 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,05x5,61)x2 0.07 M3

b Kaki Kuda-Kuda
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 4.13 M Rabung
Unit = 2 Unit Nok 5/10
Makelar 6/12
Volume = (PxLxT)xUnit
(0,12x0,06x4,13)x2 0.06 M3 Kaki Kuda-Kuda 6/12
98 Kasau 5/7

Skord Miring 6/12


446 100
Gapit 2x4/12
412
Balok Tarik 2x5/12
413
Skord Miring 6/12
446 100
Gapit 2x4/12
412
c Makelar Balok Tarik 2x5/12
413
167
Tinggi = 0.12 M 100 Gording 5/10
Tupai-Tupai
Lebar = 0.06 M 370 84 Atap Seng
123
Panjang = 1.67 M 100

Unit = 1 Unit
Volume = (PxLxT)xUnit 561
BAUT Ø5/8"
PLAFFOND TRIPLEK 6mm

(0,12x0,06x1,67x1 0.01 M3 Ring Balok 15/20

100 500 100


d Balok Gapit
Tinggi = 0.12 M
Lebar = 0.04 M
Panjang = 3.7 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,04x3,7)x2 0.04 M3

e Sokong Miring
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 0.84 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x0,84)x2 0.01 M3

f Sokong Tegak
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 1.23 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x1,23)x2 0.02 M3

Volume Total = (Jlh. Volume Total) x Unit 0.41


M3
(a+b+c+d+e) x 2
E KD-31/2
a Balok Tarik
Tinggi = 0.12 M
Lebar = 0.05 M
Panjang = 2.93 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,05x2,93)x2 0.04 M3

b Kaki Kuda-Kuda
Tinggi = 0.12 M
Lebar = 0.06 M
= M
Panjang
=
3.38
Unit
IKATAN ANGN 4/12
Unit 1
Volume = (PxLxT)xUnit ATAP GENTENG METAL
(0,12x0,06x4,38)x1 0.02 M3
GAPIT 2x4/12
SKORD MIRING 6/12
c Balok Gapit
Tinggi = 0.12 M SKORD TEGAK 6/12
Lebar = 0.04 M

2.19
Panjang = 2 M BALOK TARIK 2x5/12
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,12x0,04x2)x2 0.02 M3
GORDING 5/10

d Sokong Miring
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 1.41 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x1,41)x1 0.01 M3

e Sokong Tegak
Tinggi = 0.12 M
Lebar = 0.06 M
Panjang = 0.9 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,12x0,06x0,90)x1 0.01 M3

Volume Total = (Jlh. Volume Total) x Unit 0.10


M3
(a+b+c+d+e) x 1

VOLUME TOTAL KUDA-KUDA

Volume Total = KD-1 + KD-21/2+KD-2 + 2.09


M3 IKATAN ANGN 4/12
KD-3 +KD-31/2
ATAP GENTENG METAL
C Ikatan Angin GAPIT 2x4/12
SKORD MIRING 6/12
a Tinggi = 0.12 M
SKORD TEGAK 6/12
Lebar = 0.04 M

2.19
Panjang = 2.19 M BALOK TARIK 2x5/12
Unit = 2 Unit
Volume = (PxLxT)xUnit GORDING 5/10
(0,10x0,05x2,19)x2 0.02 M3
NOK 5/10
NOK 5/10
TIANG KUDA-KUDA 6/12
b Tinggi = 0.12 M
KAKI KUDA-KUDA 6/12
Lebar = 0.04 M IKATAN ANGN 4/12
KASAU 5/7
Panjang = 1.87 M TIANG KUDA-KUDA 6/12
GORDING 5/10
Unit = 2 Unit KAKI KUDA-KUDA 6/12
Volume = (PxLxT)xUnit
(0,10x0,05x1,87)x1 0.02 M3 Pas. Bata 1:4

1.80

c Tinggi = 0.12 M
Pas. Bata 1:4 Pas. Bata
Lebar = 0.04 M
Panjang = 1.89 M
Unit = 6 Unit
Volume = (PxLxT)xUnit 3.50
(0,10x0,05x1,89)x6 0.05 M3

+4.05 + 4.10
Volume Total = a+b+c 0.09
M3

2. RANGKA ATAP 20/30 20/30


A Gording

a Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 10.88 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x10,88)x1 0.05 M3

b Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 9.88 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x9,88)x1 0.05 M3

c Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 8.88 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x8,88)x2 0.04 M3

d Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 8.31 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x8,31)x1 0.04 M3

e Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 5.01 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x5,01)x1 0.03 M3

f Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 4.44 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x4,44)x1 0.02 M3

g Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 3.44 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x3,44)x1 0.02 M3

h Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 2.44 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x2,44)x1 0.01 M3

i Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 4.32 M
Unit =3 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x4,32)x3 0.06 M3

j Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 3.76 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x3,76)x1 0.02 M3

k Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 1.76 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x1,76)x2 0.02 M3

l Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 1.32 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x1,32)x4 0.03 M3

m Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 0.26 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x0,26)x2 0.003 M3

n Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 1.83 M
Unit = 5 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x1,83)x5 0.05 M3

o Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 6.76 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x6,76)x1 0.03 M3

p Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 4.76 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x4,76)x1 0.02 M3

q Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 2.76 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x2,76)x1 0.014 M3

r Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 0.76 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x0,76)x1 0.004 M3

s Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 11.76 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x11,76)x1 0.059 M3

t Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 9.76 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x9,76)x1 0.05 M3

u Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 7.76 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x7,76)x1 0.039 M3

v Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 5.76 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x5,76)x1 0.03 M3

w Tinggi = 0.1 M
Lebar = 0.05 M
Panjang = 2.18 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,10x0,05x2,18)x1 0.011 M3

Volume Total = a+b+c+d+e+f+g+h+i+j+k+l+ 0.70


M3
m+n+o+p+q+r+s+t+u+v+w
B Kasau
1 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.7 M
Unit = 16 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,7)x16 0.15 M3

2 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.97 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,97)x3 0.03 M3

3 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 3.47 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x3,47)x2 0.02 M3

4 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 3.97 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x3,97)x2 0.03 M3

5 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 3.89 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x3,89)x3 0.04 M3

6 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 3.39 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x3,39)x4 0.05 M3

7 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.89 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,89)x4 0.04 M3

8 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.39 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,39)x4 0.03 M3

9 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.89 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,89)x4 0.03 M3

10 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.39 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,39)x4 0.02 M3

11 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.89 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,89)x4 0.01 M3

12 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.39 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,39)x16 0.01 M3

13 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 4.2 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x4,2)x3 0.044 M3

14 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 3.45 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x3,45)x4 0.048 M3

15 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.47 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,47)x2 0.017 M3

16 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.97 M
Unit = 2 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,97)x2 0.014 M3

17 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.47 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,47)x3 0.015 M3

18 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.97 M
Unit = 4 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,97)x4 0.014 M3

19 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.83 M
Unit = 3 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,83)x3 0.019 M3

20 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.81 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,81)x1 0.01 M3

21 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.31 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,31)x1 0.005 M3

22 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.81 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,81)x1 0.003 M3

23 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.31 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,31)x1 0.001 M3

25 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 4.05 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x4,05)x1 0.014 M3

26 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 3.55 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x3,55)x1 0.012 M3

27 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 3.05 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x3,05)x1 0.011 M3

28 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.24 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,24)x1 0.008 M3

29 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.24 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,24)x1 0.004 M3

30 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.24 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,24)x1 0.001 M3

31 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.05 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,05)x1 0.00 M3

32 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 0.55 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x0,55)x1 0.002 M3

33 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.05 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,05)x1 0.004 M3

34 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.24 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,24)x1 0.008 M3

35 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 1.55 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x1,55)x1 0.005 M3

36 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.05 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,05)x1 0.007 M3

37 Tinggi = 0.07 M
Lebar = 0.05 M
Panjang = 2.55 M
Unit = 1 Unit
Volume = (PxLxT)xUnit
(0,07x0,05x2,55)x1 0.009 M3

Volume Total = No. 1+2+3+4+5+6+7+8+9+


11+12+13+14+15+16+17+18+
19+20+21+22+23+24+25+26+ 0.73 M3
27+28+29+30+31+32+33+34+
35+36+37
C Penutup Atap Seng Spandek

1 Lebar = 4.6 M
Panjang =7 M
Volume = (PxL)
(7x4,6) 32.20 M2

2 Lebar = 4.46 M
Panjang =2 M
Volume = (PxL)
(2x4,46) 8.92 M2

3 Lebar = 5.3 M
Panjang = 1.5 M
Volume = (PxL)
(1,5x5,3) 7.95 M2

4 Lebar = 5.3 M
Panjang = 4.5 M
Volume = (PxL)
(4,5x5,3) 23.85 M2

5 Lebar = 3.57 M
Panjang = 2.5 M
Volume = (PxL)
(2,5x3,57) 8.93 M2

6 Lebar = 3.57 M
Panjang = 5.27 M
Volume = (PxL)
(5,27x3,57) 18.81 M2

7 Lebar = 3.57 M
Panjang = 5.73 M
Volume = (PxL)
(5,73x3,57) 20.46 M2

8 Lebar = 5.3 M
Panjang = 6.48 M
Volume = (PxL)
(6,48x5,3) 34.34 M2

9 Lebar = 4.6 M
Panjang = 5.52 M
Volume = (PxL)
(5,52x4,6) 25.39 M2

Volume Total = No. (1+2+3+4+5+6+7+8+9) 157.00


M2

D Rabung

Panjang = 8.51 8.51 M

E Jurai Luar

Panjang = 25.06 25.06 M

F Jurai Dalam

Panjang = 8.7 8.7 M


G Lisplank

Panjang = 40.5 M
Jumlah =2 Unit
Total = (P x Unit) 81
M
(40,5 x 2)
RENCANA ANGGARAN BIAYA

PEMBANGUNAN RUMAH 2 LANTAI

Pekerjaan Lantai 1

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA
(RP) SATUAN (RP)

1 2 3 4 5 6 7=3x6
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 418.00 m2 AHSP PU A.2.2.1.9 Rp 25,850.00 Rp 10,805,300.00
2 Pengukuran / Pemasangan Bouplank 74.00 m1 AHSP PU A.2.2.1.4 Rp 118,261.00 Rp 8,751,314.00
3 Administrasi dan Dokumentasi 1.00 Ls Taksir Rp 1,000,000.00 Rp 1,000,000.00
4 K3 dan Lain-lain 1.00 Ls Taksir Rp 1,500,000.00 Rp 1,500,000.00
5 Papan Nama Proyek 1.00 Ls Taksir Rp 500,000.00 Rp 500,000.00
Sub Jumlah Rp 22,556,614.00
B PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Tapak 32.40 m3 AHSP PU A.2.3.1.8a Rp 96,626.20 Rp 3,130,688.88
Urugan Kembali Galian Pondasi Tapak 24.30 m3 AHSP PU A.2.3.1.9 Rp 56,827.10 Rp 1,380,898.53
Pas. Pasir Alas 1.35 m3 AHSP PU A.2.3.1.11 Rp 249,370.00 Rp 336,649.50
Beton Cor K-100 2.70 m3 AHSP PU A.4.1.1.1 Rp 997,879.09 Rp 2,694,273.55

2 Galian Tanah Pondasi Menerus 161.28 m3 AHSP PU A.2.3.1.8 Rp 128,425.00 Rp 20,712,384.00


Urugan Kembali Galian Pondasi Menerus 64.62 m3 AHSP PU A.2.3.1.9 Rp 56,827.10 Rp 3,672,167.20
Pas. Pasir Alas 8.06 m3 AHSP PU A.2.3.1.11 Rp 249,370.00 Rp 2,010,919.68
Pas. Batu Kosong / Aanstamping 24.19 m3 AHSP PU A.3.2.1.9 Rp 615,565.50 Rp 14,891,760.58
Pas. Pondasi Batu Gunung 75.26 m3 AHSP PU A.3.2.1.2 Rp 1,097,305.00 Rp 82,587,563.52

Sub Jumlah Rp 131,417,305.43


C PEKERJAAN PASANGAN DAN PLASTERAN
Pasangan batu bata 1 : 2 1 PC : 2 PP 117.74 m2 AHSP PU A.4.4.1.7 Rp 381,273.75 Rp 44,891,781.36
Plasteran batu bata 1 : 2 1 PC : 2 PP 235.48 m2 AHSP PU A.4.4.2.2 Rp 102,061.30 Rp 24,033,721.52
Pasangan batu bata 1 : 4 1 PC : 4 PP 549.67 m2 AHSP PU A.4.4.1.9 Rp 358,353.88 Rp 196,975,156.07
Plasteran batu bata 1 : 4 1 PC : 4 PP 1099.33 m2 AHSP PU A.4.4.2.4 Rp 96,871.50 Rp 106,494,056.08
Sub Jumlah Rp 372,394,715.04
D PEKERJAAN BETON BERTULANG
1 Pekerjaan Pondasi Tapak 0,80 x 0,80
Beton K-250 4.52 m3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 5,330,872.28
Besi Tulangan Pokok D12 -20 53.24 kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 1,735,387.30
Bekisting + Perawatan Beton 18.09 kg AHSP PU A.4.1.1.20 Rp 320,947.00 Rp 5,806,624.48

2 Pekerjaan Sloof 25/40


Beton K-250 12.52 m3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 14,756,119.99
Besi Tulangan Pokok ø 12 62.14 kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 2,025,604.21
Besi Tulangan Sengkang ø 6 - 10 cm 0.51 kg AHSP PU A.4.1.1.17 Rp 23,355.75 Rp 11,922.22
Bekisting + Perawatan Beton 50.08 m2 AHSP PU A.4.1.1.21 Rp 320,947.00 Rp 16,073,025.76

3 Pekerjaan Kolom KI - 20/20


Beton K-250 4.75 m3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 5,600,725.41
Besi Tulangan Pokok ø 12 133.16 kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 4,340,580.45
Besi Tulangan Sengkang ø 6 - 15 cm 0.29 kg AHSP PU A.4.1.1.17 Rp 23,355.75 Rp 6,738.65
Bekisting + Perawatan Beton 47.52 m2 AHSP PU A.4.1.1.22 Rp 638,038.50 Rp 30,319,589.52

4 Pekerjaan Kolom KP - 13/13


Beton K-250 1.56 m3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 1,840,460.60
Besi Tulangan Pokok ø 12 210.12 kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 6,849,042.13
Besi Tulangan Sengkang ø 6 - 15 cm 32.44 kg AHSP PU A.4.1.1.17 Rp 23,355.75 Rp 757,579.51
Bekisting + Perawatan Beton 24.02 m2 AHSP PU A.4.1.1.22 Rp 638,038.50 Rp 15,328,236.92

5 Pekerjaan Ring Balok- 20/30


Beton K-250 7.51 m3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 8,853,671.99
Besi Tulangan Pokok ø 12 103.57 kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 3,376,007.02
Besi Tulangan Sengkang ø 6 - 10 cm 31.50 kg AHSP PU A.4.1.1.17 Rp 23,355.75 Rp 735,808.49
Bekisting + Perawatan Beton 35.06 m2 AHSP PU A.4.1.1.23 Rp 650,908.50 Rp 22,818,248.38
Sub Jumlah Rp 146,566,245.33
E PEKERJAAN LANTAI
1 Timbunan Tanah Bawah Lantai 103.20 m3 AHSP PU -T.14 E Rp 150,370.00 Rp 15,518,718.87
2 Urugan Pasir Bawah Lantai 16.30 m3 AHSP PU A.2.3.1.11 Rp 249,370.00 Rp 4,064,703.82
3 Beton Cor K-100 11.53 m3 AHSP PU A.4.1.1.1 Rp 997,879.09 Rp 11,509,130.30
4 Pas. Keramik Lantai 40/40 108.53 m2 AHSP PU A.4.4.3.34.a Rp 314,776.00 Rp 34,161,096.88
5 Pas. Keramik Lantai 30/30 59.68 m2 AHSP PU A.4.4.3.35 Rp 310,165.90 Rp 18,511,910.56
Sub Jumlah Rp 83,765,560.42
F PEKERJAAN TANGGA
1 Plat Tangga
Beton K-250 0.32 m3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 382,546.52
Besi Tulangan Pokok ø 10 68.47 kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 2,231,722.35
Bekisting + Perawatan Beton 8.33 m2 AHSP PU A.4.1.1.26 Rp 594,863.50 Rp 4,957,195.83

2 Anak Tangga
Beton K-250 0.67 m3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 792,021.78
Besi Tulangan Pokok ø 10 205.40 kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 6,695,167.05
Bekisting + Perawatan Beton 5.60 m2 AHSP PU A.4.1.1.26 Rp 594,863.50 Rp 3,331,235.60

3 Balok Bordes 20/30


Beton K-250 0.05 M3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 63,114.24
Besi Tulanagan Pokok ø 16 157.82 Kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 5,144,391.65
Besi Tulanagan Sengkang ∅ 8-150 mm 37.56 Kg AHSP PU A.4.1.1.17 Rp 23,355.75 Rp 877,291.30
Bekiting + Perawatan Beton 0.25 M2 AHSP PU A.4.1.1.23 Rp 650,908.50 Rp 162,662.03

4 Plat Bordes
Beton K-250 0.18 m3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 216,759.39
Besi Tulangan Pokok ø 12 68.47 kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 2,231,722.35
Bekisting + Perawatan Beton 1.53 m2 AHSP PU A.4.1.1.26 Rp 594,863.50 Rp 911,687.80

5 Keramik
Pas. Keramik Anak Tangga + Bordes 9.02 m2 AHSP PU A.4.4.3.34.a Rp 314,776.00 Rp 2,838,933.27
Sub Jumlah Rp 30,836,451.15
G PEKERJAAN PINTU, JENDELA
1 Pas. Pintu P1
Kusen Pintu 0.06 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 611,048.30
Daun Pintu 6.10 m2 AHSP PU A.4.6.1.5 Rp 997,700.00 Rp 6,084,373.68
Daun Ventilasi 0.19 m2 AHSP PU A.4.6.1.6 Rp 753,940.00 Rp 142,494.66
-Kaca 5mm 0.22 m2 AHSP PU A.4.6.2.17 Rp 178,789.60 Rp 178,789.60
- Hak Angin / Gagang Jendela 4.00 Buah AHSP PU A.4.6.2.9 Rp 52,537.10 Rp 210,148.40
- Engsel Jendela 4.00 Buah AHSP PU A.4.6.2.6 Rp 247,237.10 Rp 988,948.40
- Pacok Jendela 2.00 Buah AHSP PU A.4.6.2.10 Rp 40,987.10 Rp 81,974.20
Kunci Pintu (Standar) 2.00 Buah AHSP PU A.4.6.2.4 Rp 266,761.00 Rp 533,522.00
Engsel Pintu 4.00 Buah AHSP PU A.4.6.2.5 Rp 252,737.10 Rp 1,010,948.40
Pacok Pintu 2.00 Buah Taksir Rp 15,000.00 Rp 30,000.00

2 Pas. Pintu P3
Kusen Pintu 0.288 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 3,198,915.72
Daun Pintu 10.38 m2 AHSP PU A.4.6.1.5 Rp 997,700.00 Rp 10,357,323.24
Papan Ventilasi/Jelusi 0.01 m3 AHSP PU A.4.6.1.10 Rp 940,665.00 Rp 5,926.19
Kunci Pintu (Standar) 6.00 Buah AHSP PU A.4.6.2.4 Rp 266,761.00 Rp 1,600,566.00
Engsel Pintu 12.00 Buah AHSP PU A.4.6.2.5 Rp 252,737.10 Rp 3,032,845.20

3 Pas. Pintu P4
Kusen Pintu 0.204 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 2,267,629.65
Ambang Daun Pintu 3.05 m2 AHSP PU A.4.6.1.5 Rp 997,700.00 Rp 3,045,778.56
-Kaca 5mm 6.97 m2 AHSP PU A.4.6.2.17 Rp 178,789.60 Rp 1,246,521.09
Kunci Pintu (Standar) 8.00 Buah AHSP PU A.4.6.2.4 Rp 266,761.00 Rp 2,134,088.00
Engsel Pintu 16.00 Buah AHSP PU A.4.6.2.5 Rp 252,737.10 Rp 4,043,793.60
Pacok Pintu 4.00 Buah Taksir Rp 15,000.00 Rp 60,000.00

4 Pas. Pintu P5
Kusen Pintu 0.120 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 1,329,419.52
Daun Pintu 4.54 m2 AHSP PU A.4.6.1.6 Rp 753,940.00 Rp 3,419,871.84
Pacok Pintu 3.00 Buah Taksir Rp 15,000.00 Rp 45,000.00
Engsel Pintu 6.00 Buah AHSP PU A.4.6.2.5 Rp 252,737.10 Rp 1,516,422.60

5 Pas. Pintu Garasi


Kusen Pintu 0.07 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 777,225.74
Daun Pintu 10.04 m2 AHSP PU A.4.6.1.5 Rp 753,940.00 Rp 7,569,557.60
Kunci Pintu (Standar) 2.00 Buah AHSP PU A.4.6.2.4 Rp 15,000.00 Rp 30,000.00
Engsel Pintu 16.00 Buah AHSP PU A.4.6.2.5 Rp 252,737.10 Rp 4,043,793.60
Pacok Pintu 4.00 Buah Taksir Rp 15,000.00 Rp 60,000.00
6 Pas. Jendela J1
Kusen Jendela 0.187 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 2,077,218.00
Daun Jendela 1.50 m2 AHSP PU A.4.6.1.6 Rp 753,940.00 Rp 1,129,100.54
- Kaca 5 mm 2.36 m2 AHSP PU A.6.2.17 Rp 178,789.60 Rp 422,229.52
Daun Ventilasi 0.68 m2 AHSP PU A.4.6.1.10 Rp 940,665.00 Rp 636,642.07
- Kaca 5 mm 2.36 m2 AHSP PU A.6.2.17 Rp 178,789.60 Rp 422,229.52
- Hak Angin / Gagang Jendela 16.00 Buah AHSP PU A.4.6.2.9 Rp 52,537.10 Rp 840,593.60
- Engsel Jendela 16.00 Buah AHSP PU A.4.6.2.6 Rp 247,237.10 Rp 3,955,793.60
- Pacok Jendela 8.00 Buah AHSP PU A.4.6.2.10 Rp 40,987.10 Rp 327,896.80

7 Jendela J3
Kusen Jendela 0.048 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 529,690.59
Daun Jendela 0.58 m2 AHSP PU A.4.6.1.6 Rp 753,940.00 Rp 439,094.66
- Kaca 5 mm 0.83 m2 AHSP PU A.6.2.17 Rp 178,789.60 Rp 148,037.79
- Hak Angin / Gagang Jendela 4.00 Buah AHSP PU A.4.6.2.9 Rp 52,537.10 Rp 210,148.40
- Engsel Jendela 4.00 Buah AHSP PU A.4.6.2.6 Rp 247,237.10 Rp 988,948.40
- Pacok Jendela 2.00 Buah AHSP PU A.4.6.2.10 Rp 40,987.10 Rp 81,974.20

8 Jendela J4
Kusen Jendela 0.113 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 1,253,254.86
Daun Jendela 1.77 m2 AHSP PU A.4.6.1.6 Rp 753,940.00 Rp 1,331,759.62
- Kaca 5 mm 3.78 m2 AHSP PU A.6.2.17 Rp 178,789.60 Rp 675,824.69
- Hak Angin / Gagang Jendela 12.00 Buah AHSP PU A.4.6.2.9 Rp 52,537.10 Rp 630,445.20
- Engsel Jendela 12.00 Buah AHSP PU A.4.6.2.6 Rp 247,237.10 Rp 2,966,845.20
- Pacok Jendela 6.00 Buah AHSP PU A.4.6.2.10 Rp 40,987.10 Rp 245,922.60

9 Ventilasi V1
Kusen Ventilasi 0.014 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 159,253.38
- Kaca 5 mm 0.10 m2 AHSP PU A.6.2.17 Rp 178,789.60 Rp 18,594.12

10 Ventilasi V2
Kusen Ventilasi 0.023 m3 AHSP PU A.4.6.2.6 Rp 247,237.10 Rp 5,708.21
- Kaca 5 mm 0.21 m2 AHSP PU A.6.2.17 Rp 178,789.60 Rp 37,188.24

Sub Jumlah Rp 79,191,319.58


H PEKERJAAN INSTALASI LISTRIK
1 Lampu Saving Energi 20 Watt 9 Bh Taksir Rp 45,000.00 Rp 405,000.000
2 Lampu Saving Energi 18 Watt 5 Bh Taksir Rp 40,000.00 Rp 200,000.000
3 Lampu Saving Energi 11 Watt 4 Bh Taksir Rp 35,000.00 Rp 140,000.000
4 Saklar Tunggal 4 Bh Taksir Rp 10,000.00 Rp 40,000.000
5 Saklar Ganda 8 Bh Taksir Rp 15,000.00 Rp 120,000.000
Sub Jumlah Rp 905,000.000
I PEKERJAAN PLAFOND
1 Rangka Plafond Kayu Klas II 179.48 m2 AHSP PU A.4.6.1.20 Rp 105,872.25 Rp 19,002,173.76
2 Plafon Triplek 6 mm 179.48 m2 AHSP PU A.4.5.1.5 Rp 57,668.88 Rp 10,350,530.79
3 Kayu List Plafond 81.83 m1 AHSP PU A.4.5.1.9 Rp 28,286.50 Rp 2,314,684.30
Sub Jumlah Rp 31,667,388.846
J PEKERJAAN PENGECATAN
1 Cat Dinding Luar Dan Dalam 1099.3 m2 AHSP PU A.4.7.1.10 Rp 38,414.75 Rp 42,230,610.04
2 Cat Plafond 179.48 m2 AHSP PU A.4.7.1.4 Rp 54,004.50 Rp 9,692,841.07
3 Cat Kusen 59.98 m2 AHSP PU A.4.7.1.4 Rp 54,004.50 Rp 3,239,427.53
Sub Jumlah Rp 55,162,878.64

E PEKERJAAN ATAP
1 Rangka kuda-kuda Kayu K1
-KD-4 0.51 M3 AHSP PU A.4.6.1.14 Rp 13,234,100.00 Rp 6,761,672.24
- KD-41/2 0.25 M3 AHSP PU A.4.6.1.14 Rp 13,234,100.00 Rp 3,308,313.25
2 Gording Kayu Kelas II 0.32 M3 AHSP PU A.4.6.1.15 Rp 11,053,240.00 Rp 3,492,823.84
3 Atap Seng 109.17 M2 AHSP PU A.4.5.2.39.a Rp 90,194.50 Rp 9,846,082.59
4 Kasau Kelas II 0.50 M3 AHSP PU A.4.6.1.15 Rp 11,053,240.00 Rp 5,502,358.14
5 Rabung Seng 2.82 M1 AHSP PU A.4.5.2.39.a Rp 90,194.50 Rp 254,348.49
6 Jurai Seng 17.91 M1 AHSP PU A.4.5.2.39.a Rp 90,194.50 Rp 1,615,383.50
7 Papan Listplank Uk. 2,5/25 cm 44.00 M1 AHSP PU A.4.6.1.21 Rp 116,589.00 Rp 5,129,916.00
8 Ikatan Angin 0.02 M3 AHSP PU A.4.6.1.15 Rp 11,053,240.00 Rp 218,588.87
Sub Jumlah Rp 36,129,486.93
Pekerjaan Lantai 2
A PEKERJAAN BETON BERTULANG
1 Beton Bertulang Kolom KI- 20/20
Beton K-250 1.63 M3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 1,925,838.66
Besi Tulangan Pokok ø 12 133.16 Kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 4,340,580.45
Besi Tulangan Sengkang ø 6 - 15 cm 0.29 Kg AHSP PU A.4.1.1.17 Rp 23,355.75 Rp 6,738.65
Bekisting + Perawatan Beton 10.00 M2 AHSP PU A.4.1.1.22 Rp 638,038.50 Rp 6,380,385.00

2 Beton Bertulang Kolom KP- 13/13


Beton K-250 1.35 M3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 1,595,464.22
Besi Tulangan Pokok ø 12 210.12 Kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 6,849,042.13
Besi Tulangan Sengkang ø 6 - 15 cm 32.44 Kg AHSP PU A.4.1.1.17 Rp 23,355.75 Rp 757,579.51
Bekisting + Perawatan Beton 15.38 M2 AHSP PU A.4.1.1.22 Rp 638,038.50 Rp 9,815,976.92

3 Beton Bertulang Balok Latai - 20/30


Beton K-250 5.37 M3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 6,331,224.07
Besi Tulangan Pokok ø 12 73.98 Kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 2,411,433.59
Besi Tulangan Sengkang ø 6 - 10 cm 31.50 Kg AHSP PU A.4.1.1.17 Rp 23,355.75 Rp 735,808.49
Bekisting + Perawatan Beton 4.67 M2 AHSP PU A.4.1.1.23 Rp 650,908.50 Rp 3,037,573.00

4 Beton Bertulang Ring Balok - 15/20


Beton K-250 3.58 M3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 4,220,816.05
Besi Tulangan Pokok ø 12 177.55 Kg AHSP PU A.4.1.1.17.a Rp 32,595.75 Rp 5,787,440.60
Besi Tulangan Sengkang ø 6 - 10 cm 40.77 Kg AHSP PU A.4.1.1.17 Rp 23,355.75 Rp 952,222.76
Bekisting + Perawatan Beton 5.17 M2 AHSP PU A.4.1.1.23 Rp 650,908.50 Rp 3,363,027.25

Sub Jumlah Rp 58,511,151.36


B PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan batu bata 1 : 2 1 PC : 2 PP 23.07 m2 AHSP PU A.4.4.1.7 Rp 381,273.75 Rp 8,795,222.87
2 Plasteran batu bata 1 : 2 1 PC : 2 PP 46.14 m2 AHSP PU A.4.4.2.2 Rp 102,061.30 Rp 4,708,700.14
3 Pasangan batu bata 1 : 4 1 PC : 4 PP 156.66 m2 AHSP PU A.4.4.1.9 Rp 358,353.88 Rp 56,138,356.31
4 Plasteran batu bata 1 : 4 1 PC : 4 PP 313.31 m2 AHSP PU A.4.4.2.4 Rp 96,871.50 Rp 30,351,042.16
Sub Jumlah Rp 99,993,321.47
C PEKERJAAN LANTAI
1 Pek. Plat Lantai
Beton K-250 11.98 m3 AHSP PU A.4.1.1.8 Rp 1,178,603.83 Rp 14,121,366.39
Besi Tulangan Plat Lantai ø 12 - 15 cm 98.59 Kg AHSP PU A.4.1.1.17 Rp 32,595.75 Rp 3,213,680.18
Bekisting + Perawatan Beton 8.33 m2 AHSP PU A.4.1.1.24 Rp 946,038.50 Rp 7,883,654.17

2 Pek. Keramik
Pas. Keramik Lantai 40/40 94.76 m2 AHSP PU A.4.4.3.34.a Rp 314,776.00 Rp 29,829,590.25
Pas. Keramik Lantai 30/30 7.68 m2 AHSP PU A.4.4.3.35 Rp 310,165.90 Rp 2,381,701.91

Sub Jumlah Rp 57,429,992.91


D PEKERJAAN PINTU, JENDELA DAN KUNCI
1 Pas. Pintu P2
Kusen Pintu 0.06 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 649,130.63
Daun Pintu 3.01 m2 AHSP PU A.4.6.1.5 Rp 997,700.00 Rp 3,002,677.92
Kunci Pintu (Standar) 1.00 Buah AHSP PU A.4.6.2.4 Rp 266,761.00 Rp 266,761.00
Engsel Pintu 4.00 Buah AHSP PU A.4.6.2.5 Rp 252,737.10 Rp 1,010,948.40
Pacok Pintu 2.00 Buah Taksir Rp 15,000.00 Rp 30,000.00

2 Pas. Pintu PJ
Kusen PJ 0.068 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 758,184.57
Daun Pintu 1.89 m2 AHSP PU A.4.6.1.5 Rp 997,700.00 Rp 1,888,047.48
Kunci Pintu (Standar) 1.00 Buah AHSP PU A.4.6.2.4 Rp 266,761.00 Rp 266,761.00
Engsel Pintu 2.00 Buah AHSP PU A.4.6.2.5 Rp 10,500.00 Rp 21,000.00
Daun Jendela 1.89 m2 AHSP PU A.4.6.1.6 Rp 940,665.00 Rp 1,780,490.71
- Kaca 5 mm 1.12 m2 AHSP PU A.6.2.17 Rp 178,789.60 Rp 199,386.16
- Hak Angin / Gagang Jendela 4.00 Buah AHSP PU A.4.6.2.9 Rp 52,537.10 Rp 210,148.40
- Engsel Jendela 4.00 Buah AHSP PU A.4.6.2.6 Rp 247,237.10 Rp 988,948.40
- Pacok Jendela 2.00 Buah AHSP PU A.4.6.2.10 Rp 40,987.10 Rp 81,974.20

3 Pas. Pintu P3
Kusen Pintu 0.110 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 1,225,558.62
Daun Pintu 3.46 m2 AHSP PU A.4.6.1.5 Rp 997,700.00 Rp 3,452,441.08
Papan Ventilasi/Jelusi 0.01 m3 AHSP PU A.4.6.1.10 Rp 940,665.00 Rp 11,852.38
Kunci Pintu (Standar) 2.00 Buah AHSP PU A.4.6.2.4 Rp 266,761.00 Rp 533,522.00
Engsel Pintu 4.00 Buah AHSP PU A.4.6.2.5 Rp 252,737.10 Rp 1,010,948.40
Pacok Pintu 4.00 Buah Taksir Rp 15,000.00 Rp 60,000.00
4 Pas. Pintu P5
Kusen Pintu 0.092 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 1,024,760.88
Daun Pintu 2.95 m2 AHSP PU A.4.6.1.5 Rp 997,700.00 Rp 2,947,205.80
Pacok Pintu 2.00 Buah Taksir Rp 15,000.00 Rp 30,000.00
Engsel Pintu 4.00 Buah AHSP PU A.4.6.2.5 Rp 252,737.10 Rp 1,010,948.40

6 Jendela J2
Kusen Jendela 0.238 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 2,638,066.86
Daun Jendela 2.25 m2 AHSP PU A.4.6.1.6 Rp 940,665.00 Rp 2,113,109.86
- Kaca 5 mm 3.54 m2 AHSP PU A.6.2.17 Rp 178,789.60 Rp 633,344.28
- Hak Angin / Gagang Jendela 12.00 Buah AHSP PU A.4.6.2.9 Rp 52,537.10 Rp 630,445.20
- Engsel Jendela 12.00 Buah AHSP PU A.4.6.2.6 Rp 247,237.10 Rp 2,966,845.20
- Pacok Jendela 6.00 Buah AHSP PU A.4.6.2.10 Rp 40,987.10 Rp 245,922.60

7 Jendela J3
Kusen Jendela 0.039 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 429,291.72
Daun Jendela 0.59 m2 AHSP PU A.4.6.1.6 Rp 940,665.00 Rp 553,863.55
- Kaca 5 mm 0.83 m2 AHSP PU A.6.2.17 Rp 178,789.60 Rp 148,037.79
- Hak Angin / Gagang Jendela 4.00 Buah AHSP PU A.4.6.2.9 Rp 52,537.10 Rp 210,148.40
- Engsel Jendela 4.00 Buah AHSP PU A.4.6.2.6 Rp 247,237.10 Rp 988,948.40
- Pacok Jendela 2.00 Buah AHSP PU A.4.6.2.10 Rp 40,987.10 Rp 81,974.20

9 Ventilasi V1
Kusen Ventilasi 0.014 m3 AHSP PU A.4.6.1.1 Rp 11,096,250.00 Rp 159,253.38
- Kaca 5 mm 0.10 m2 AHSP PU A.6.2.17 Rp 178,789.60 Rp 18,594.12

10 Ventilasi V2
Kusen Ventilasi 0.023 m3 AHSP PU A.4.6.2.6 Rp 247,237.10 Rp 5,708.21
- Kaca 5 mm 0.21 m2 AHSP PU A.6.2.17 Rp 178,789.60 Rp 37,188.24
Sub Jumlah Rp 34,322,438.43
E PEKERJAAN INSTALASI LISTRIK
1 Lampu Saving Energi 20 Watt 6 Bh Taksir Rp 45,000.00 Rp 270,000.000
2 Lampu Saving Energi 18 Watt 2 Bh Taksir Rp 40,000.00 Rp 80,000.000
3 Lampu Saving Energi 11 Watt 2 Bh Taksir Rp 35,000.00 Rp 70,000.000
4 Saklar Tunggal 4 Bh Taksir Rp 10,000.00 Rp 40,000.000
5 Saklar Ganda 3 Bh Taksir Rp 15,000.00 Rp 45,000.000
Sub Jumlah Rp 505,000.000
F PEKERJAAN PLAFOND
1 Rangka Plafond Kayu Klas II 113.26 m2 AHSP PU A.4.6.1.20 Rp 105,872.25 Rp 11,990,826.35
2 Plafon Triplek 6 mm 113.26 m2 AHSP PU A.4.5.1.5 Rp 57,668.88 Rp 6,531,432.61
3 Kayu List Plafond 73.00 m1 AHSP PU A.4.5.1.9 Rp 54,004.50 Rp 3,942,328.50
Sub Jumlah Rp 22,464,587.465
G PEKERJAAN PENGECATAN
1 Cat Dinding Luar Dan Dalam 359.4 m2 AHSP PU A.4.7.1.10 Rp 38,414.75 Rp 13,808,120.42
2 Cat Plafond 113.26 m2 AHSP PU A.4.7.1.4 Rp 54,004.50 Rp 6,116,414.66
3 Cat Kusen 25.80 m2 AHSP PU A.4.7.1.4 Rp 54,004.50 Rp 1,393,505.12
Sub Jumlah Rp 21,318,040.20

H PEKERJAAN ATAP
1 Rangka kuda-kuda Kayu K1
-KD-1 0.70 M3 AHSP PU A.4.6.1.14 Rp 13,234,100.00 Rp 9,317,335.76
- KD-21/2 0.15 M3 AHSP PU A.4.6.1.14 Rp 13,234,100.00 Rp 1,938,319.22
-KD-2 0.74 M3 AHSP PU A.4.6.1.14 Rp 13,234,100.00 Rp 9,773,224.04
- KD-31/3 0.10 M3 AHSP PU A.4.6.1.14 Rp 13,234,100.00 Rp 1,261,580.28
-KD-3 0.41 M3 AHSP PU A.4.6.1.14 Rp 13,234,100.00 Rp 5,403,324.22
2 Gording Kayu Kelas II 0.70 M3 AHSP PU A.4.6.1.15 Rp 11,053,240.00 Rp 7,777,612.33
3 Atap Seng 157.00 M2 AHSP PU A.4.5.2.39.a Rp 90,194.50 Rp 14,160,626.69
4 Kasau Kelas II 0.73 M3 AHSP PU A.4.6.1.15 Rp 11,053,240.00 Rp 8,096,664.10
5 Rabung Seng 8.51 M1 AHSP PU A.4.5.2.39.a Rp 90,194.50 Rp 767,555.20
6 Jurai Seng 33.76 M1 AHSP PU A.4.5.2.39.a Rp 90,194.50 Rp 3,044,966.32
7 Papan Listplank Uk. 2,5/25 cm 81.00 M1 AHSP PU A.4.6.1.21 Rp 116,589.00 Rp 9,443,709.00
8 Ikatan Angin 0.09 M3 AHSP PU A.4.6.1.15 Rp 11,053,240.00 Rp 1,032,461.04
Sub Jumlah Rp 72,017,378.21
Sub Total Rp 1,357,154,875
PERHITUNGAN BESI DAN BEKISTING

Pekerjaan Bangunan rumah 2 lantai


Lokasi Banda Aceh

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


1 Sloof ( 0.25 x 0.40 ) M = 1/( b x h)
= 10.00 m'
Jumlah Tul. Pokok = 5.00 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 12.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = 2.00 Batang Berat besi Ø 12, = 44.39 kg
Ø Tul. Pinggang = 12.00 mm
Ø Tul. Begel = 6.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 10.00 M Berat besi Ø 12, = 17.76 kg
Luas Permukaan Papan = 0.80 M2
3. Tulangan Begel Besi Ø 6,
Panjang begel = 1.150 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
25 = 1.00 ± ------->
2 btg

40
Berat besi Ø 6, = Byk begel x Pjg begel x 0.006165 x dia.2
7Ø12 = 0.51 kg

4. Papan mal = Pjg balok untuk 1 m3 beton x L. permukaan papan

Ø6-10 = 8.000 m2

Total Berat Besi = 62.65 Kg/M3


Papan mal 2 x Pakai = 4.00 M2/M3

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


2 Kolom K1 ( 0.20 x 0.20 ) M = 1/( b x h)
= 25.00 m'
Jumlah Tul. Pokok = 4.00 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 12.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = 2.00 Batang Berat besi Ø 12, = 88.78 kg
Ø Tul. Pinggang = 12.00 mm
Ø Tul. Begel = 6.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 15.000 M Berat besi Ø 12, = 44.39 kg
Luas Permukaan Papan = 0.80 M2
3. Tulangan Begel Besi Ø 6,
Panjang begel = 0.650 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel

20
= 1.67 ± ------->
2 btg

Berat besi Ø 6, = Byk begel x Pjg begel x 0.006165 x dia.2

20
= 0.29 kg
8Ø12

4. Papan mal = Pjg balok untuk 1 m3 beton x L.permukaan papan


Ø6-15 = 20.00 m2

Total Berat Besi = 133.45 Kg


Papan mal 2 x Pakai = 10.000 M2
NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN Panjang balok untuk 1 m3


3 Kolom KP ( 0.13 x 0.13 ) M = 1/( b x h)
= 59.17 m'
Jumlah Tul. Pokok = 4.00 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 12.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Berat besi Ø 12, = 210.12 kg

Ø Tul. Begel = 6.00 mm


Jarak Begel = 0.150 M
Luas Permukaan Papan = 0.52 M2
2. Tulangan Begel Besi Ø 6,
Panjang begel = 0.370 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 394.48 ± ------->
395 btg

Berat besi Ø 6, = Byk begel x Pjg begel x 0.006165 x dia.2

13
= 32.44 kg
4Ø12
4. Papan mal = Pjg balok untuk 1 m3 beton xL.permukaan papan
= 30.77 m2

Total Berat Besi = 242.56 Kg


Papan mal 2 x Pakai = 15.385 M2

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3
Balok RB 20/30
PERHITUNGAN Panjang balok untuk 1 m3
4 ( 0.20 x 0.30 ) M = 1/( b x h)
= 16.67 m'
Jumlah Tul. Pokok = 5.00 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 12.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = 2.00 Batang Berat besi Ø 12, = 73.98 kg
Ø Tul. Pinggang = 12.00 mm
Ø Tul. Begel = 6.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 12, = 29.59 kg
Luas Permukaan Papan = 0.56 M2
3. Tulangan Begel Besi Ø 6,
Panjang begel = 0.850 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 166.67 ± ------->
167 btg

Berat besi Ø 6, = Byk begel x Pjg begel x 0.006165 x dia.2

30 7Ø12

4. Papan mal
=

=
31.5044 kg

Pjg balok untuk 1 m3 beton x L. permukaan papan


= 9.33 m2

Ø6-10 Total Berat Besi = 135.08 Kg


Papan mal 2 x Pakai = 4.667 M2
NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3
Balok RB 15/20
PERHITUNGAN Panjang balok untuk 1 m3
5 ( 0.15 x 0.20 ) M = 1/( b x h)
= 33.33 m'
Jumlah Tul. Pokok = 4.00 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 12.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = 2.00 Batang Berat besi Ø 12, = 118.37 kg
Ø Tul. Pinggang = 12.00 mm
Ø Tul. Begel = 6.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 12, = 59.18 kg
Luas Permukaan Papan = 0.31 M2
3. Tulangan Begel Besi Ø 6,
Panjang begel = 0.550 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
Ø6-10 = 333.33 ± ------->

20
334 btg
7Ø12

Berat besi Ø 6, = Byk begel x Pjg begel x 0.006165 x dia.2


= 40.7704 kg

4. Papan mal = Pjg balok untuk 1 m3 beton x L. permukaan papan


= 10.33 m2

Total Berat Besi = 218.32 Kg


Papan mal 2 x Pakai = 5.167 M2

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3
Balok Bordes 20/30
PERHITUNGAN Panjang balok untuk 1 m3
6 ( 0.20 x 0.30 ) M = 1/( b x h)
= 16.67 m'
Jumlah Tul. Pokok = 6.00 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 16.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Berat besi Ø 16, = 157.82 kg

Ø Tul. Begel = 8.00 mm


Jarak Begel = 0.150 M
Luas Permukaan Papan = 0.56 M2
2. Tulangan Begel Besi Ø 8,
Panjang begel = 0.850 m'
200 Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 111.11 ± ------->
112 btg

Berat besi Ø 8, = Byk begel x Pjg begel x 0.006165 x dia.2


300

= 37.5621 kg

3. Papan mal = Pjg balok untuk 1 m3 beton x L. permukaan papan


= 9.33 m2

Total Berat Besi = 195.39 Kg


Papan mal 2 x Pakai = 4.667 M2

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN 1. Untuk Bidang 0,97 Meter


7 Plat Bordes = 12 cm Panjang Besi (Pjb) = 0.97 M
Jumlah Baris Besi (Jb) = 15.80 M
Bidang X = 2.37 M Jumlah Lapis (Jl) = 1.00 Lapis
Bidang Y = 0.97 M Diameter Besi (d) = 10.00 mm
Tebal Pengecoran = 0.12 M
Diameter Besi = 10.00 mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
Jarak Tulangan = 0.15 M = 9.44 Kg

2. Untuk Bidang 2,37 Meter


Panjang Besi (Pjb) = 2.37 M
Jumlah Baris Besi (Jb) = 6.47 M
Jumlah Lapis (Jl) = 1.00 Lapis
Diameter Besi (d) = 10.00 mm

Berat besi Ø 10, = Pjg*Jb*Jl*0.006162*d*d


= 9.44 Kg

Total Berat Besi = 18.89 Kg

Berat Besi Untuk 1 m3 Beton = 68.47 Kg / M3 Beton

Luas Bekisting Untuk 1 m3 Beton = 8.333 M2 / M3 Beton

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN 1. Untuk Bidang 1,12 Meter


8 Plat Tangga = 12 cm Panjang Besi (Pjb) = 3.22 M
Jumlah Baris Besi (Jb) = 7.47 M
Bidang X = 1.12 M Jumlah Lapis (Jl) = 1.00 Lapis
Bidang Y = 3.22 M Diameter Besi (d) = 10.00 mm
Tebal Pengecoran = 0.12 M
Diameter Besi = 10.00 mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
Jarak Tulangan = 0.15 M = 14.82 Kg

2. Untuk Bidang 3,22 Meter


Panjang Besi (Pjb) = 1.12 M
Jumlah Baris Besi (Jb) = 21.47 M
Jumlah Lapis (Jl) = 1.00 Lapis
Diameter Besi (d) = 10.00 mm

Berat besi Ø 10, = Pjg*Jb*Jl*0.006162*d*d


= 14.82 Kg

Total Berat Besi = 29.63 Kg

Berat Besi Untuk 1 m3 Beton = 68.47 Kg / M3 Beton


Luas Bekisting Untuk 1 m3 Beton = 8.33 M2 / M3 Beton

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3
PERHITUNGAN 1. Untuk Bidang 1.30 Meter
9 Anak Tangga = 12 cm Panjang Besi (Pjb) = 0.30 M
Jumlah Baris Besi (Jb) = 2.00 M
Bidang X = 0.20 M Jumlah Lapis (Jl) = 2.00 Lapis
Bidang Y = 0.30 M Diameter Besi (d) = 10.00 mm
Tebal Pengecoran = 0.12 M
Diameter Besi = 10.00 mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
Jarak Tulangan = 0.10 M = 0.739 Kg

2. Untuk Bidang 2.00 Meter


Panjang Besi (Pjb) = 0.20 M
Jumlah Baris Besi (Jb) = 3.00 M
Jumlah Lapis (Jl) = 2.00 Lapis
Diameter Besi (d) = 10.00 mm

Berat besi Ø 10, = Pjg*Jb*Jl*0.006162*d*d


= 0.739 Kg

Total Berat Besi = 1.48 Kg

Berat Besi Untuk 1 m3 Beton = 205.40 Kg / M3 Beton

Luas Bekisting Untuk 1 m3 Beton = 8.333 M2 / M3 Beton

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN 1. Untuk Bidang 34,92 Meter


10 Plat Lantai = 12 cm Panjang Besi (Pjb) = 43.69 M
Jumlah Baris Besi (Jb) = 232.80 M
Bidang X = 34.92 M Jumlah Lapis (Jl) = 1.00 Lapis
Bidang Y = 43.69 M Diameter Besi (d) = 12.00 mm
Tebal Pengecoran = 0.12 M
Diameter Besi = 12.00 mm Berat Besi = Pjg*Jb*Jl*0.006162*d*d
Jarak Tulangan = 0.15 M = 9025.04 Kg

2. Untuk Bidang 43,69 Meter


Panjang Besi (Pjb) = 34.92 M
Jumlah Baris Besi (Jb) = 291.27 M
Jumlah Lapis (Jl) = 1.00 Lapis
Diameter Besi (d) = 12.00 mm

Berat besi Ø 12, = Pjg*Jb*Jl*0.006162*d*d


= 9025.04 Kg

Total Berat Besi = 18,050.1 Kg


Berat Besi Untuk 1 m3 Beton = 98.59 Kg / M3 Beton

Luas Bekisting Untuk 1 m3 Beton = 8.333 M2 / M3 Beton

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3

PERHITUNGAN 1. Untuk Bidang 0,8 Meter


11 Pondasi Tapak 80/80 = 80 cm Panjang Besi (Pjb) = 0.80 M
Jumlah Baris Besi (Jb) = 4.00 M
Bidang X = 0.80 M Jumlah Lapis (Jl) = 2.00 Lapis
Bidang Y = 0.80 M Diameter Besi (d) = 12.00 mm
Tebal Pengecoran = 0.25 M
Diameter Besi = 12.00 mm Berat besi Ø 12, = Pjg*Jb*Jl*0.006162*d*d
Jarak Tulangan = 0.2 M = 5.679 Kg

2. Untuk Bidang 0,8 Meter


Ø12 - 20 Panjang Besi (Pjb) = 0.80 M
Jumlah Baris Besi (Jb) = 4.00 M
Jumlah Lapis (Jl) = 1.00 Lapis
Ø12 - 20

Diameter Besi (d) = 12.00 mm


Ø12- 20

38 80

Berat besi Ø 12, = Pjg*Jb*Jl*0.006162*d*d


Ø12 - 20 = 2.839 Kg

Total Berat Besi = 8.52 Kg

13
Berat Besi Untuk 1 m3 Beton = 53.24 Kg / M3 Beton
80
Luas Bekisting Untuk 1 m3 Beton = 4.000 M2 / M3 Beton

NO. BENTUK / DIMENSI / UKURAN PERHITUNGAN VOLUME

1 2 3
PERHITUNGAN
12 Pedestal Pondasi tapak Panjang balok untuk 1 m3
( 0.13 x 0.38 ) M = 1/( b x h)
= 20.24 m'
Jumlah Tul. Pokok = 4.00 Batang a. Pembesian untuk 1 m3 beton adalah
Ø Tul. Pokok = 12.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = 2.00 Batang Berat besi Ø 12, = 71.88 kg
Ø Tul. Pinggang = 12.00 mm
Ø Tul. Begel = 6.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.15 M Berat besi Ø 12, = 35.94 kg
Luas Permukaan Papan = 1.02 M2
3. Tulangan Begel Besi Ø 6,
Panjang begel = 0.870 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
2 Ø 12 = 134.95 ± ------->
Ø6 - 15 135 btg
2 Ø 12 2 Ø 12 2 Ø 12
2 Ø 12
Berat besi Ø 6, = Byk begel x Pjg begel x 0.006165 x dia.2
Ø6 - 15 = 26.0669 kg

2 Ø 12
13 38
2 Ø 12
Ø6 - 15

2 Ø 12 2 Ø 12 2 Ø 12
2 Ø 12
Ø6 - 15

2 Ø 12 4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan


13 38
= 20.65 m2

Total Berat Besi = 133.89 Kg


Papan mal 2 x Pakai = 10.32 M2
REKAPTULASI
RENCANA ANGGARAN BIAYA

Pekerjaan : Pembangunan Rumah 2 Lantai


Lokasi : Banda Aceh
Tahun Anggaran : 2019

NO URAIAN PEKERJAAN JUMLAH HARGA

LANTAI I
1 PEKERJAAN PERSIAPAN Rp 22,556,614
2 PEKERJAAN TANAH DAN PONDASI Rp 131,417,305
3 PEKERJAAN PASANGAN DAN PLASTERAN Rp 372,394,715
4 PEKERJAAN BETON BERTULANG Rp 146,566,245
5 PEKERJAAN LANTAI Rp 83,765,560
6 PEKERJAAN TANGGA Rp 30,836,451
7 PEKERJAAN PINTU, JENDELA Rp 79,191,320
8 PEKERJAAN INSTALASI LISTRIK Rp 905,000
9 PEKERJAAN PLAFOND Rp 31,667,389
10 PEKERJAAN PENGECATAN Rp 55,162,879
11 PEKERJAAN ATAP Rp 36,129,487

LANTAI II
1 PEKERJAAN BETON BERTULANG Rp 58,511,151
2 PEKERJAAN PASANGAN DAN PLASTERAN Rp 99,993,321
3 PEKERJAAN LANTAI Rp 57,429,993
4 PEKERJAAN PINTU, JENDELA DAN KUNCI Rp 34,322,438
5 PEKERJAAN INSTALASI LISTRIK Rp 505,000
6 PEKERJAAN PLAFOND Rp 22,464,587
7 PEKERJAAN PENGECATAN Rp 21,318,040
8 PEKERJAAN ATAP Rp 72,017,378

Jumlah Harga Pekerjaan Rp 1,357,154,875


Dibulatkan Rp 1,357,200,000
Terbilang : Satu Miliar Tiga Ratus Lima Puluh Tujuh Juta Dua Ratus Ribu Rupiah